WorldWideScience

Sample records for source upgrade project

  1. The Atlas upgrade project

    International Nuclear Information System (INIS)

    Bollinger, L.M.

    1988-01-01

    ATLAS is a heavy-ion accelerator system consisting of a 9-MV tandem electrostatic injector coupled to a superconducting linac. A project now well advanced will upgrade the capabilities of ATLAS immensely by replacing the tandem and its negative-ion source with a positive-ion injector that consists of an electron-cyclotron resonance (ECR) ion source and a 12-MV superconducting injector linac of novel design. This project will increase the beam intensity 100 fold and will extend the projectile-mass range up to uranium. Phase 1 of the work, which is nearing completion in late 1988, will provide an injector comprising the ECR source and its 350-kV voltage platform, beam analysis and bunching systems, beam lines, and a prototype 3-MV linac. The ECR source and its voltage platform are operational, development of the new class of low-frequency interdigital superconducting resonators required for the injector linac has been completed, and assembly of the whole system is in progress. Test runs and then routine use of the Phase 1 injector systems are planned for early 1989, and the final 12-MV injector linac will be commissioned in 1990. 12 refs., 6 figs

  2. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  3. Upgrades and expansion of the Cornell High Energy Synchrotron Source (CHESS)

    International Nuclear Information System (INIS)

    White, Jeffrey A.

    2000-01-01

    The Cornell High Energy Synchrotron Source (CHESS) is a user-oriented National Facility that provides state-of-the-art synchrotron radiation facilities to scientists worldwide. With major new funding in 1999, we now have 5 ongoing upgrade and expansion projects: 1) a new building addition that will house a new wiggler beamline (CHESS G-line) with three new experimental stations; 2) a new more powerful wiggler source for both A and G beamlines; 3) an upgrade to the A-line optics for better heat load handling and focussing; 4) a rebuild of the F-cave optics room with new optics to handle higher machine current; and 5) a renovation to the user laboratory space surrounding the F1 and F2 crystallography stations. We expect these upgrades and a new G line Cornell faculty collaborating group to raise the level of excitement and productivity at CHESS for many years to come

  4. Progress on the Design of the Storage Ring Vacuum System for the Advanced Photon Source Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Stillwell, B.; Billett, B.; Brajuskovic, B.; Carter, J.; Kirkus, E.; Lale, M.; Lerch, J.; Noonan, J.; O' Neill, M.; Rocke, B.; Suthar, K.; Walters, D.; Wiemerslage, G.; Zientek, J.

    2017-06-20

    Recent work on the design of the storage ring vacuum system for the Advanced Photon Source Upgrade project (APS-U) includes: revising the vacuum system design to accommodate a new lattice with reverse bend magnets, modifying the designs of vacuum chambers in the FODO sections for more intense incident synchrotron radiation power, modifying the design of rf-shielding bellows liners for better performance and reliability, modifying photon absorber designs to make better use of available space, and integrated planning of components needed in the injection, extraction and rf cavity straight sections. An overview of progress in these areas is presented.

  5. The Kyoto University tandem upgrading project

    International Nuclear Information System (INIS)

    Nakamura, Masanobu; Shimoura, Susumu; Takimoto, Kiyohiko; Sakaguchi, Harutaka; Kobayashi, Shinsaku

    1988-01-01

    A brief description on the Kyoto University tandem upgrading project. The project consists of replacing the old 5 MV tandem Van de Graaff by an 8UDH pelletron. The old pressure vessel and beam lines are used again without significant modification. The project is planned to be completed at the end of 1989. (orig.)

  6. ATLAS 10 GHz electron cyclotron resonance ion source upgrade project

    CERN Document Server

    Moehs, D P; Pardo, R C; Xie, D

    2000-01-01

    A major upgrade of the first ATLAS 10 GHz electron cyclotron resonance (ECR) ion source, which began operations in 1987, is in the planning and procurement phase. The new design will convert the old two-stage source into a single-stage source with an electron donor disk and high gradient magnetic field that preserves radial access for solid material feeds and pumping of the plasma chamber. The new magnetic-field profile allows for the possibility of a second ECR zone at a frequency of 14 GHz. An open hexapole configuration, using a high-energy-product Nd-Fe-B magnet material, having an inner diameter of 8.8 cm and pole gaps of 2.4 cm, has been adopted. Models indicate that the field strengths at the chamber wall, 4 cm in radius, will be 9.3 kG along the magnet poles and 5.6 kG along the pole gaps. The individual magnet bars will be housed in austenitic stainless steel, allowing the magnet housing within the aluminum plasma chamber to be used as a water channel for direct cooling of the magnets. Eight solenoid...

  7. Superhilac upgrade project

    International Nuclear Information System (INIS)

    Feinberg, B.; Brown, I.G.

    1985-05-01

    This project will increase the uranium output of the Bevalac heavy-ion facility from the currently available 10 7 to 5 x 10 7 ions/pulse, allowing accurate Lamb shift measurements to be made in U 90+ and U 91+ with important applications to the testing of quantum electrodynamics and the development of an x-ray laser. The injected beam intensity will be increased to make better use of the 10emA output space-charge limit of the Wideroe linac. Components will include a new high current MEtal Vapor Vacuum Arc (MEVVA) ion source along with an improved high current, high voltage Cockcroft-Walton power supply to handle the increased beam current. The Low Energy Beam Transport (LEBT) line will be upgraded with additional focusing to manage the increased space-charge forces and with an improved vacuum to reduce charge exchange losses. Finally, the phase matching between the 23MHz Wideroe linac and the 70MHz Alvarez linac will be improved by the addition of the appropriate buncher cavities. Physics design is underway and detailed engineering is scheduled to begin in October 1985, with installation slated for the 1986 summer shutdown

  8. CMS pixel upgrade project

    CERN Document Server

    Kaestli, Hans-Christian

    2010-01-01

    The LHC machine at CERN finished its first year of pp collisions at a center of mass energy of 7~TeV. While the commissioning to exploit its full potential is still ongoing, there are plans to upgrade its components to reach instantaneous luminosities beyond the initial design value after 2016. A corresponding upgrade of the innermost part of the CMS detector, the pixel detector, is needed. A full replacement of the pixel detector is planned in 2016. It will not only address limitations of the present system at higher data rates, but will aggressively lower the amount of material inside the fiducial tracking volume which will lead to better tracking and b-tagging performance. This article gives an overview of the project and illuminates the motivations and expected improvements in the detector performance.

  9. CMS pixel upgrade project

    CERN Document Server

    INSPIRE-00575876

    2011-01-01

    The LHC machine at CERN finished its first year of pp collisions at a center of mass energy of 7 TeV. While the commissioning to exploit its full potential is still ongoing, there are plans to upgrade its components to reach instantaneous luminosities beyond the initial design value after 2016. A corresponding upgrade of the innermost part of the CMS detector, the pixel detector, is needed. A full replacement of the pixel detector is planned in 2016. It will not only address limitations of the present system at higher data rates, but will aggressively lower the amount of material inside the fiducial tracking volume which will lead to better tracking and b-tagging performance. This article gives an overview of the project and illuminates the motivations and expected improvements in the detector performance.

  10. Project scenarios for bitumen upgrading

    International Nuclear Information System (INIS)

    Koppel, P.E.; Mazurek, W.L.; Harji, A.

    2002-01-01

    The established reserves of Alberta's heavy oil resources are 178 billion barrels, and potential recoverable reserves are 315 billion barrels. The challenge of production includes the logistics of recovery, upgrading and transportation to market. Utilization of the bitumen is not simple because bitumen is too viscous to transport by pipeline. In addition, it is not processable by most existing refineries unless it can be upgraded through dilution. This paper examined different factors regarding the economic viability of various upgrading methods of a wide range of bitumen feedstocks. The study also examined the sensitivity of refinery demand to the prices of these feedstocks, along with the competitiveness among bitumen-based feedstock and conventional crudes. Western Canada, Ontario and the PADD II district in the United States are the 3 major markets for western Canadian bitumen based feedstock, the demand for which depends on refinery configurations and asphalt demand. This paper described the following 4 generic scenarios that describe Alberta bitumen upgrading projects: (1) adjacent to open pit mines, (2) adjacent to steam assisted gravity drainage (SAGD) facilities, (3) remotely located from resource production at an existing refinery, and (4) pipeline bitumen. It was noted that producers should determine the best way to upgrade the bitumen to ensure there is an economic market for the product, but they should also be aware not to over process the bitumen so as not to leave existing refinery facilities under-utilized. 2 refs., 1 tab., 3 figs

  11. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  12. Kongiganak Wind Turbine Replacement and System Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Boonstra, Patrick [Intelligent Energy Systems, Anchorage, AK (United States)

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  13. An Upgrade for the Advanced Light Source

    International Nuclear Information System (INIS)

    Chemla, Daniel S.; Feinberg, Benedict; Hussain, Zahid; Kirz, Janos; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson, Arthur L.; Smith, Neville V.

    2004-01-01

    One of the first third-generation synchrotron light sources, the ALS, has been operating for almost a decade at Berkeley Lab, where experimenters have been exploiting its high brightness for forefront science. However, accelerator and insertion-device technology have significantly changed since the ALS was designed. As a result, the performance of the ALS is in danger of being eclipsed by that of newer, more advanced sources. The ALS upgrade that we are planning includes full-energy, top-off injection with higher storage-ring current and the replacement of five first-generation insertion devices with nine state-of-the art insertion devices and four new application-specific beamlines now being identified in a strategic planning process. The upgrade will help keep the ALS at the forefront of soft x-ray synchrotron light sources for the next two decades

  14. UPGRADES

    CERN Multimedia

    J. Spalding and D. Contardo

    2012-01-01

      The CMS Upgrade Programme consists of four classes of projects: (a) Detector and Systems upgrades which are ongoing and largely (though not entirely) target LS1. (b) Full system upgrades for three projects that are preparing TDRs: Pixels, HCAL and L1 Trigger. The projects target completion by LS2. (c) Infrastructure consolidation and upgrades to improve operational robustness and to support the above projects. (d) Phase 2 replacement of the Tracker and major upgrades of the Trigger and Forward Detectors. For (a) and (c), detailed costing exists and is being integrated into a common reporting system. The schedule milestones for each project will be linked into the overall schedule planning for LS1. For the three TDR projects, the designs have progressed significantly since the Technical Proposal in 2010. Updated detailed cost estimates and schedules will be prepared with the TDRs to form the basis for tracking the projects through completion. To plan the upgrades and the supporting simulati...

  15. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    International Nuclear Information System (INIS)

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  16. Project W-314 241-AN-A valve pit upgrade acceptance for beneficial use

    Energy Technology Data Exchange (ETDEWEB)

    HAMMERS, J.S.

    1999-07-21

    This report identifies the responsibilities and requirements, applicable to the 241-AN-A Valve Pit Upgrades portion of Project W-314, for Acceptance for Beneficial Use in accordance with HNF-IP-0842, Vol IV, Sec 3.12. At project turnover, the end user accepts the affected Structures, Systems, and Components (SSCs) for beneficial use. This checklist is used to help the end user ensure that all documentation, training, and testing requirements are met prior to turnover. This checklist specifically identifies those items related to the upgrading of the 241-AN-A valve pit. The upgrades include: the installation of jumper/valve manifolds with position sensors, replacement pit leak detection systems, construction of replacement cover blocks, and electrical upgrades to support the instrumentation upgrades.

  17. Project W-314 241-AN-A valve pit upgrade acceptance for beneficial use

    International Nuclear Information System (INIS)

    HAMMERS, J.S.

    1999-01-01

    This report identifies the responsibilities and requirements, applicable to the 241-AN-A Valve Pit Upgrades portion of Project W-314, for Acceptance for Beneficial Use in accordance with HNF-IP-0842, Vol IV, Sec 3.12. At project turnover, the end user accepts the affected Structures, Systems, and Components (SSCs) for beneficial use. This checklist is used to help the end user ensure that all documentation, training, and testing requirements are met prior to turnover. This checklist specifically identifies those items related to the upgrading of the 241-AN-A valve pit. The upgrades include: the installation of jumper/valve manifolds with position sensors, replacement pit leak detection systems, construction of replacement cover blocks, and electrical upgrades to support the instrumentation upgrades

  18. Project W-030 safety class upgrade summary report

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1998-01-01

    This document presents a summary of safety class criteria for the 241-AY/AZ Tank Farm primary ventilation system upgrade under Project W-030, and recommends acceptance of the system as constructed, based on a review of supporting documentation

  19. TA-55 facility control system upgrade project - human-system interface functional requirements

    International Nuclear Information System (INIS)

    Atkins, W.H.; Pope, N.G.; Turner, W.J.; Brown, R.E.

    1995-11-01

    The functional requirements for that part of the Technical Area (TA)-55 Operations Center Upgrade Project that involves the human-system interface (HSI) are described in this document. The upgrade project seeks to replace completely the center's existing computerized data acquisition and display system, which consists of the field multiplexer units, Data General computer systems, and associated peripherals and software. The upgrade project has two parts-the Facility Data Acquisition Interface System (FDAIS) and the HSI. The HSI comprises software and hardware to provide a high-level graphical operator interface to the data acquisition system, as well as data archiving, alarm annunciation, and logging. The new system will be built with modern, commercially available components; it will improve reliability and maintainability, and it can be expanded for future needs

  20. Fault tree analysis of Project S-4404, Upgrade Canyon Exhaust System

    International Nuclear Information System (INIS)

    Browne, E.V.; Low, J.M.; Lux, C.R.

    1992-01-01

    Project S-4404, Upgrade Canyon Exhaust Systems, is a $177 million project with the purpose of upgrading the Exhaust Systems for both F and H Canyon Facilities. This upgrade will replace major portions of the F and H-Canyon exhaust systems, downstream of their respective sand filters with higher capacity and more reliable systems. Because of the high cost, DOE requested Program Control ampersand Integration (PC ampersand I) to examine specific deletions to the project. PC ampersand I requested Nuclear Processes Safety Research (NPSR) to perform an analysis to compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed exhaust system and specific proposed exhaust system alternatives. The objective of this work was to perform an analysis and compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed project exhaust system and proposed project alternatives. Based on fault tree analysis, two conclusions are made. First, D ampersand D activities can be eliminated from the project with no significant decrease to exhaust system safety. Deletion of D ampersand D activities would result in a cost savings of $29 million. Second, deletion of DOE Order 6430.1A requirements regarding DBAs would decrease exhaust system safety by a factor of 12

  1. Tank farm restoration and safe operation, project W-314, upgrade scope summary report (USSR)

    International Nuclear Information System (INIS)

    Jacobson, R.W.

    1997-01-01

    This revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from Alternative Generation Analysis (AGA), customer guidance, and changing requirements. It defines the actual upgrades currently in scope, and provides traceability to the requirements and/or drivers

  2. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  3. A fundamental research for upgrading heavy oil using syngas as hydrogen source

    Energy Technology Data Exchange (ETDEWEB)

    Yan, D.; Yuan, M.; Sun, X.; Zhao, S. [China Univ. of Petroleum, Beijing (China). State Key Laboratory of Heavy Oil Processing

    2006-07-01

    The stock of heavy oil and residue from petroleum fractions has become more important as a component in supplying demands for fuel and petrochemical feeds. Finding economical means of upgrading heavy oils is extremely important in order to ensure future fuel supply. A number of new technologies for upgrading heavy oils have been evaluated, including residual fluid catalytic cracking (RFCC), hydrogenation, thermal conversion, and solvent deasphalting. However, the commercial application of such technologies is mainly constrained by the metal and residual carbon concentrations that are present in all heavy oils. Conventional technologies used to upgrade vacuum residue (VR) result in heavy coke formation, with a consequential reduction in the life of expensive, high-performance catalysts. The hydro upgrading process can significantly remove the concentration of heteroatom such as sulfur, nitrogen, and metals in the liquid products. This paper investigated upgrading of heavy oil using syngas as an alternative hydrogen source with a dispersed catalyst. The paper discussed the experiment with reference to the feedstock and catalyst precursors; finely dispersed catalysts preparation; experimental apparatus; experimental design and procedure; and analysis. The results were presented in terms of effects of catalyst dispersion; effect of hydro-upgrading heavy oil using syngas as alternative source; and effects of different catalysts on residue hydrocracking. Last, the paper discussed the properties of the hydrocracked oil treated with syngas. The study confirmed the effectiveness of the slurry bed hydrocracking catalyst using syngas as a hydrogen source. 23 refs., 8 tabs., 16 figs.

  4. CDF End Plug calorimeter Upgrade Project

    International Nuclear Information System (INIS)

    Apollinari, G.; de Barbaro, P.; Mishina, M.

    1994-01-01

    We report on the status of the CDF End Plug Upgrade Project. In this project, the CDF calorimeters in the end plug and the forward regions will be replaced by a single scintillator based calorimeter. After an extensive R ampersand D effort on the tile/fiber calorimetry, we have now advanced to a construction phase. We review the results of the R ampersand D leading to the final design of the calorimeters and the development of tooling devised for this project. The quality control program of the production of the electromagnetic and hadronic calorimeters is described. A shower maximum detector for the measurement of the shower centroid and the shower profile of electrons, γ and π 0 has been designed. Its performance requirements, R ampersand D results and mechanical design are discussed

  5. Study on upgrade on nuclear control related open source information website

    International Nuclear Information System (INIS)

    Kim, H. T.; Park, S. S.; Park, W. S.; Choi, Y. M.

    2002-01-01

    The open source information relevant to the nuclear control is regularly collected, analyzed, and published to the three web sites by the Technology Center for Nuclear Control (TCNC) of the Korea Atomic Energy Research Institute (KAERI). These web sites are world-wide, KAERI-wide, and TCNC-wide, respectively. We are to upgrade the KAERI-wide website to the access-controlled world-wide web site with some additional functionality. In this research, the current status of the three nuclear control related open source information websites managed by the TCNC was introduced and methods for upgrading the KAERI-wide open source information website and associated information security technology were reviewed

  6. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  7. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  8. DIII-D UPGRADE PROJECT FINAL REPORT FOR THE PERIOD OCTOBER 1, 1993 THROUGH MAY 31, 2003

    International Nuclear Information System (INIS)

    STAMBAUGH, RD

    2003-01-01

    OAK-B135 Under DOE Contracts DE-AC03-89ER51114 and DE-AC03-99ER54463 to General Atomics (GA), three ''capital project'' upgrade projects were accomplished on DIII-D from FY93 to FY03 at a total GA cost of $27.2M. These projects included the Fast Wave Current Drive (FWCD) Upgrade ($8.2M), the Radiative Divertor Upgrade ($7.2M) and the Electron Cyclotron Heating (ECH) Upgrade ($11.8M). The ECH and FWCD upgrades provided DIII-D rf and microwave power for electron heating, driving plasma current, controlling the plasma current profile, controlling tearing mode instabilities, and modulated transport studies.The divertor provided adequate density and impurity control for high triangularity single null plasmas in the Advanced Tokamak (AT) Program and information for International Thermonuclear Experimental Reactor (ITER) divertor design. These upgrades provide the power and density control required to initiate the active control of advanced tokamak discharges, which is the key element in the DIII-D program

  9. Hazard categorization of K Basin water filtration upgrade project

    International Nuclear Information System (INIS)

    Conn, K.R.

    1995-01-01

    This supporting document provides the hazards categorization for the K Basin Water Filtration Upgrade Project at K East. All activities associated with the project are less than Hazard Category 3, except for the handling of the ECO-ROK liners containing spent filter cartridges. All activities involving the handling of liners, containing spent cartridges, by monorail, forklift or mobile crane are classified as Hazard Category 3

  10. Design review report: AN valve pit upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314, Tank Farm Restoration and Safe Operations, is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farms' waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first package to be performed is the AN Valve Pit Upgrades package. The scope of the modifications includes new pit cover blocks, valve manifolds, leak detectors, transfer line connections (for future planned transfer lines), and special protective coating for the 241-AN-A and 241-AN-B valve pits

  11. Upgrading across Organisational and Geographical Configurations : Analysis of the Chinese Automotive Industry

    NARCIS (Netherlands)

    E. van Tuijl (Erwin)

    2015-01-01

    markdownabstract__Abstract__ This thesis deals with upgrading: a process of learning and knowledge sourcing in order to generate value added. We analyse how upgrading takes place across various organisational configurations: formal collaboration, clusters, projects, and events. Moreover, we

  12. X-ray intensity and source size characterizations for the 25 kV upgraded Manson source at Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Loisel, G., E-mail: gploise@sandia.gov; Lake, P.; Gard, P.; Dunham, G.; Nielsen-Weber, L.; Wu, M. [Sandia National Laboratories, Albuquerque, New Mexico 87185 (United States); Norris, E. [Missouri University of Science and Technology, Rolla, Missouri 65409 (United States)

    2016-11-15

    At Sandia National Laboratories, the x-ray generator Manson source model 5 was upgraded from 10 to 25 kV. The purpose of the upgrade is to drive higher characteristics photon energies with higher throughput. In this work we present characterization studies for the source size and the x-ray intensity when varying the source voltage for a series of K-, L-, and M-shell lines emitted from Al, Y, and Au elements composing the anode. We used a 2-pinhole camera to measure the source size and an energy dispersive detector to monitor the spectral content and intensity of the x-ray source. As the voltage increases, the source size is significantly reduced and line intensity is increased for the three materials. We can take advantage of the smaller source size and higher source throughput to effectively calibrate the suite of Z Pulsed Power Facility crystal spectrometers.

  13. X-ray intensity and source size characterizations for the 25 kV upgraded Manson source at Sandia National Laboratories.

    Science.gov (United States)

    Loisel, G; Lake, P; Gard, P; Dunham, G; Nielsen-Weber, L; Wu, M; Norris, E

    2016-11-01

    At Sandia National Laboratories, the x-ray generator Manson source model 5 was upgraded from 10 to 25 kV. The purpose of the upgrade is to drive higher characteristics photon energies with higher throughput. In this work we present characterization studies for the source size and the x-ray intensity when varying the source voltage for a series of K-, L-, and M-shell lines emitted from Al, Y, and Au elements composing the anode. We used a 2-pinhole camera to measure the source size and an energy dispersive detector to monitor the spectral content and intensity of the x-ray source. As the voltage increases, the source size is significantly reduced and line intensity is increased for the three materials. We can take advantage of the smaller source size and higher source throughput to effectively calibrate the suite of Z Pulsed Power Facility crystal spectrometers.

  14. The UKIRT Upgrades Programme

    Science.gov (United States)

    Adamson, Andy; Davies, John; Robson, Ian

    Tim Hawarden presented this paper to the 30th anniversary workshop, just a month before his untimely death. The editors have done their best to convert his talk into this paper, and gratefully acknowledge the assistance of Nick Rees (a member of the Upgrades team, now at Diamond Light Source). Tim's discussion concerned the UKIRT Upgrades Project, which ran through the 1990s and transformed the telescope and made it truly competitive on the world stage for operation into the twenty-first century. The reference list at the end of the paper is comprehensive; some of these are referred to in the paper itself and some are included for completeness only.

  15. European dimension of the implementation of the IAEA TC model project 'Upgrading radiation protection infrastructure'

    International Nuclear Information System (INIS)

    Sabol, J.

    2001-01-01

    A comprehensive evaluation carried out by the IAEA during the period 1984-1995 showed that eleven countries in Europe -- Albania, Armenia, Belarus, Bosnia and Herzegovina, Cyprus, Estonia, Georgia, Latvia, Lithuania, the Republic of Moldova, The Former Yugoslav Republic (TFYR) of Macedonia -- did not have a satisfactory system for radiation protection and the safety of radiation sources in accordance with the recommended international requirements. During the past four years, these countries have been participating in a Model Project aimed at upgrading radiation protection infrastructure in the Europe region with special emphasis on the establishment of an effective legal framework for adequate regulatory control of radiation sources and facilities. This paper analyses the results accomplished in the implementation of this project. It presents the main objectives, based on the present achievements for a follow-up programme to be carried out in participating and also in some other Member States with insufficient national infrastructures for assuring adequate safety in nuclear and radiation technologies. (author)

  16. Tank farm restoration and safe operation, Project W-314, upgrade scope summary report (USSR)

    International Nuclear Information System (INIS)

    Gilbert, J.L.

    1998-01-01

    The revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from customer guidance. Included are incorporation of the recommendations from HNF-2500, agreements regarding interfaces with Project W-211, and assumption of scope previously assigned to Project W-454

  17. Managing RTP Console Upgrading Project: Best Practice for Nuclear Malaysia as TSO in Supporting NPP Development

    International Nuclear Information System (INIS)

    Nurfarhana Ayuni Joha; Syahirah Abdul Rahman; Izhar Abu Hussin

    2011-01-01

    Human Resource Development (HRD) is required for Nuclear Power Programme (NPP). To be a Technical Support Organisation (TSO) for NPP, Nuclear Malaysia should be ready to take the responsibility in supporting Nuclear Regulatory Agency (NRA) and NPP Operators. In nurturing Nuclear Malaysia as TSO, the prime important and focus of HRD for the NPP is the reactor engineering technology. Nuclear Malaysia gives various phases of supports needed to build NPP such as during siting, design, planning, licensing, construction, commissioning, operation and maintenance in its own way and capability. The current Nuclear Malaysia unique approach is the TRIGA PUSPATI reactor (RTP) upgrading project. Research reactor plays an important role in Research and Developpement organization as a nuclear facility to assist the development of NPP. Therefore, upgrading the research reactor is needed to build the skills and gain knowledge of workers to work safely. After 29 years of operation, the RTP system is facing aging problems due to many components in the reactor are outdated. Therefore, immediate action should be carried out to mitigate the aging factor of the reactor to prevent the worsening of the aging problem, and to prevent untoward incident from happening. Action should also cover short and long term planning to prevent current situation from recurring. Currently, RTP is upgrading its console from analog to digital system. One of the achievements in this console upgrading project is the development and implementation of project management. This paper comprises the overview on the RTP console upgrading project, the project management and how this project can lead Nuclear Malaysia to be a good TSO for the development of NPP. (author)

  18. Safety upgrading of Novi Han Repository under IAEA TC Project BUL/4/005 achievements and future plans

    International Nuclear Information System (INIS)

    Stefanova, I.

    2003-01-01

    The report presents the safety upgrading of the Novi Han Repository under the IAEA TC Project BUL/4/005. The Project covers: identification of radionuclide inventory; characterisation of the disposal vaults; site characterisation; safety assessment; upgrading of the monitoring and radiation control; selection of treatment and conditioning processes and a conceptual design for a new waste processing and storage facility and other direct measures for safety improvement. The current inventory is identified and presented in the report. Schemes of the vault for solid wastes and vault for biological wastes are given, demonstrating reinforced concrete, stainless steel lining, and hydro insulation are presented. Several studies for safety assessment are made between 1997 and 2003. The operational safety assessment for disposal in existing facilities gives the annual risk for: spilling of waste package during upload (7.58.10 -9 ); spilling of waste package in transport accident (2.90.10 -9 ); fire scenario (3.50.10 - 1 3 ); radionuclide release due to flooding or earthquake (5.05.10 -4 ). The monitoring radiation control is upgraded according to the regulatory guidance and covered the site, restricted zone (1 km) and supervised zone (5 km). The types of analyses made are: Direct measurement of the dose rate -TLD; Direct measurements of the dose rate - portable surveillance monitors; In situ gamma spectrometry; Gamma spectrometry; Gross beta, gross alpha; Liquid scintillation spectrometry. The analyses show no transfer od radionuclides to the environment. The individual radiation control shows no evidence for specific radiation pathology. The operational radiation control service premises and transport vehicles. The following is measured: gamma dose rate; beta exposure; alpha exposure; neutron radiation; contamination level. Under the development is a detailed technical design supply of equipment for characterization of waste, including hot cell for control over high level

  19. Status of the National Synchrotron Light Source upgrade

    International Nuclear Information System (INIS)

    Culwick, B.B.; Smith, J.D.

    1985-01-01

    The demands for real-time control, data acquisition and display from accelerators of the National Synchrotron Light Source have exceeded the capabilities of the computer control system designed in 1978. In January 1985, a workshop on control systems was held at Brookhaven, one of the purposes of which was to provide impetus and design goals for an upgrade of the NSLS control system. The resulting design is described and its status reported

  20. Scientific upgrades at the high flux isotope reactor at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Selby, D.L.; Garrett, D.L.; Lucas, A.T.; Reeves, M.E.

    2001-01-01

    The United States Department of Energy is sponsoring a number of projects that will provide scientific upgrades to the neutron science facilities associated with the high flux isotope reactor (HFIR) located at Oak Ridge National Laboratory. Funding for the first upgrade project was initiated in 1996 and all presently identified upgrade projects are expected to be completed by the end of 2003. The upgrade projects include: 1) larger beam tubes, 2) a new monochromator drum for the HB-1 beam line, 3) a new HB-2 beam line system that includes one thermal guide and a new monochromator drum, 4) new instruments for the HB-2 beamline, 5) a new monochromator drum for the HB-3 beam line, 6) a supercritical hydrogen cold source system to be retrofitted into the HB-4 beam tube, 7) a 3.5 kW refrigeration system at 20 K to support the cold source and a new building to house it, 8) a new HB-4 beam line system composed of four cold neutron guides with various mirror coatings and associated shielding, 9) a number of new instruments for the cold beams including two new SANS instruments, and 10) construction of support buildings. This paper provides a short summary of these projects including their present status and schedule. (orig.)

  1. The Upgrade of the Neutron Induced Positron Source NEPOMUC

    Science.gov (United States)

    Hugenschmidt, C.; Ceeh, H.; Gigl, T.; Lippert, F.; Piochacz, C.; Pikart, P.; Reiner, M.; Weber, J.; Zimnik, S.

    2013-06-01

    In summer 2012, the new NEutron induced POsitron Source MUniCh (NEPOMUC) was installed and put into operation at the research reactor FRM II. At NEPOMUC upgrade 80% 113Cd enriched Cd is used as neutron-gamma converter in order to ensure an operation time of 25 years. A structure of Pt foils inside the beam tube generates positrons by pair production. Moderated positrons leaving the Pt front foil are electrically extracted and magnetically guided to the outside of the reactor pool. The whole design, including Pt-foils, the electric lenses and the magnetic fields, has been improved in order to enhance both the intensity and the brightness of the positron beam. After adjusting the potentials and the magnetic guide and compensation fields an intensity of about 3·109 moderated positrons per second is expected. During the first start-up, the measured temperatures of about 90°C ensure a reliable operation of the positron source. Within this contribution the features and the status of NEPOMUC upgrade are elucidated. In addition, an overview of recent positron beam experiments and current developments at the spectrometers is given.

  2. Superconducting link bus design for the accelerator project for upgrade of LHC

    International Nuclear Information System (INIS)

    Nobrega, F.; Brandt, J.; Cheban, S.; Feher, S.; Kaducak, M.; Kashikhin, V.; Peterson, T.

    2011-01-01

    The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. Fermi National Accelerator Laboratory in collaboration with Brookhaven National Laboratory was developing sub-systems for the upgrade of the LHC final focus magnet systems. Part of the upgrade called for various lengths of superconducting power transmission lines known as SC Links which were up to 100 m long. The SC Link electrically connects the current leads in the Distribution Feed Boxes to the interaction region magnets. The SC Link is an extension of the magnet bus housed within a cryostat. The present concept for the bus consists of 22 power cables, 4 x 13 kA, 2 x 7 kA, 8 x 2.5 kA and 8 x 0.6 kA bundled into one bus. Different cable and strand possibilities were considered for the bus design including Rutherford cable. The Rutherford cable bus design potentially would have required splices at each sharp elbow in the SC Link. The advantage of the round bus design is that splices are only required at each end of the bus during installation at CERN. The round bus is very flexible and is suitable for pulling through the cryostat. Development of the round bus prototype and of 2 splice designs is described in this paper. Magnetic analysis and mechanical test results of the 13 kA cable and splices are presented.

  3. An upgrade practice of a double-rack source 60Co source irradiator

    International Nuclear Information System (INIS)

    Dong Hui; Peng Wei; Liu Zhaomin

    2009-01-01

    An upgrade practice of a double-rack irradiator with the design capacity of 2.96 x10 16 Bq (800 kCi) was reported. The detailed contents and characteristics of this upgrade, a comparison on the facility performance before and after the upgrade, and the cost-benefit analysis were carried out. After upgrade, the facility performance increased over 50%, and brought much directly economical benefit and indirectly economical benefit. The upgrade was successful, and set up a demonstrational sample. (authors)

  4. LHC Injectors Upgrade (LIU) Project at CERN

    CERN Document Server

    Shaposhnikova, Elena; Damerau, Heiko; Funken, Anne; Gilardoni, Simone; Goddard, Brennan; Hanke, Klaus; Kobzeva, Lelyzaveta; Lombardi, Alessandra; Manglunki, Django; Mataguez, Simon; Meddahi, Malika; Mikulec, Bettina; Rumolo, Giovanni; Scrivens, Richard; Vretenar, Maurizio

    2016-01-01

    A massive improvement program of the LHC injector chain is presently being conducted under the LIU project. For the proton chain, this includes the replacement of Linac2 with Linac4 as well as all necessary upgrades to the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS) and Super Proton Synchrotron (SPS), aimed at producing beams with the challenging High Luminosity LHC (HL-LHC) parameters. Regarding the heavy ions, plans to improve the performance of Linac3 and the Low Energy Ion Ring (LEIR) are also pursued under the general LIU program. The full LHC injection chain returned to operation after Long Shutdown 1, with extended beam studies taking place in Run 2. A general project Cost and Schedule Review also took place in March 2015, and several dedicated LIU project reviews were held to address issues awaiting pending decisions. In view of these developments, 2014 and 2015 have been key years to define a number of important aspects of the final LIU path. This paper will describe the reviewed LI...

  5. Recent achievements of the ATLAS upgrade Planar Pixel Sensors R and D project

    International Nuclear Information System (INIS)

    Casse, G

    2014-01-01

    The ATLAS upgrade Planar Pixel Sensors (PPS) project aims to prove the suitability of silicon detectors processed with planar technology to equip all layers of the pixel vertex detector proposed for the upgrade of the ATLAS experiment for the future High Luminosity LHC at CERN (HL-LHC). The detectors need to be radiation tolerant to the extreme fluences expected to be received during the experimental lifetime, with optimised geometry for full coverage and high granularity and affordable in term of cost, due to the relatively large area of the upgraded ATLAS detector system. Here several solutions for the detector geometry and results with radiation hard technologies (n-in-n, n-in-p) are discussed

  6. Full scope upgrade project for the Fermi 2 simulator

    International Nuclear Information System (INIS)

    Bollacasa, D.; Gonsalves, J.B.; Newcomb, P.C.

    1994-01-01

    The Detroit Edison company (DECO) concentrated the Simulation Division of Asea Brown Boveri (ABB) to perform a full scope upgrade of the Fermi 2 simulator. The Fermi 2 plant is a BWR 6 generation Nuclear Steam Supply System (NSSS). The project included the complete replacement of the existing simulation model sofware with ABB's high fidelity BWR models, addition of an advanced instructor station facility and new simulation computers. Also provided on the project were ABB's advanced simulation environment (CETRAN), a comprehensive configuration management system based on a modern relational database system and a new computer interface to the input/output system. (8 refs., 2 figs.)

  7. Reference moderator calculated performance for the LANSCE upgrade project

    International Nuclear Information System (INIS)

    Ferguson, P.D.; Russell, G.J.; Pitcher, E.J.

    1995-01-01

    The authors have calculated the performance of five moderators of interest to the LANSCE upgrade project. Coupled and decoupled light water and liquid hydrogen moderators in flux-trap geometry surrounded by a neutronically infinite heavy-water cooled beryllium reflector have been studied. Time and energy spectra, as well as semi-empirical fits to the data, are presented. The data has been made available to aid the instrument design and moderator selection process

  8. Research and Development on the Storage Ring Vacuum System for the APS Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Stillwell, B.; Brajuskovic, B.; Carter, J.; Cease, H.; Lill, R.; Navrotski, G.; Noonan, J.; Suthar, K.; Walters, D.; Wiemerslage, G.; Zientek, J.; Sangroula, M.

    2016-01-01

    A number of research and development activities are underway at Argonne National Laboratory to build confidence in the designs for the storage ring vacuum system required for the Advanced Photon Source Up-grade project (APS-U) [1]. The predominant technical risks are: excessive residual gas pressures during operation; insufficient beam position monitor stability; excessive beam impedance; excessive heating by induced electrical surface currents; and insufficient operational reliability. Present efforts to mitigate these risks include: building and evaluating mockup assemblies; performing mechanical testing of chamber weld joints; developing computational tools; investigating design alternatives; and performing electrical bench measurements. Status of these activities and some of what has been learned to date will be shared.

  9. Acceptance test report for project C-157 ''T-Plant electrical upgrade''

    International Nuclear Information System (INIS)

    Jeppson, L.A.

    1997-01-01

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ''Acceptance Test Proceedure for Project C-157 'T Plant Electrical Upgrade''' The test was completed and approved without any problems or exceptions

  10. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    Energy Technology Data Exchange (ETDEWEB)

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  11. The Advanced Light Source Upgrade

    International Nuclear Information System (INIS)

    Chemla, Daniel S.; Feinberg, Benjamin; Hussain, Zahid; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson, Arthur L.; Smith, Neville V.

    2003-01-01

    The ALS, a third-generation synchrotron light source at Berkeley Lab, has been operating for almost a decade and is generating forefront science by exploiting the high brightness of a third-generation source in three areas: (1) high resolving power for spectroscopy; (2) high spatial resolution for microscopy and spectromicroscopy; and (3) high coherence for experiments such as speckle. However, the ALS was one of the first third-generation machines to be designed, and accelerator and insertion-device technology have significantly changed since its conception. As a result, its performance will inevitably be outstripped by newer, more advanced sources. To remain competitive and then set a new standard, the performance of the ALS, in particular its brightness, must be enhanced. Substantial improvements in brightness and current have always been feasible in principle, but they incur the penalty of a much reduced lifetime, which is totally unacceptable to our users. Significant brightness improvements can be realized in the core soft x-ray region by going to top-off operation, where injection would be quasi-continuous and the lifetime objections disappear. In top-off mode with higher average current, a reduced vertical emittance and beta function, and small-gap permanent-magnet or superconducting insertion devices, one to two orders of magnitude improvement in brightness can be had in the soft x-ray range. These improvements also extend the high energy range of the undulator radiation beyond the current limit of 2000 eV. Descriptions of the upgrade and the important new science achievable are presented

  12. Needs analysis and project schedule for the Los Alamos National Laboratory (LANL) Health Physics Analysis Laboratory (HPAL) upgrade

    International Nuclear Information System (INIS)

    Rhea, T.A.; Rucker, T.L.; Stafford, M.W.

    1990-01-01

    This report is a needs assessment and project schedule for the Health Physics Analysis Laboratory (HPAL) upgrade project at Los Alamos National Laboratory (LANL). After reviewing current and projected HPAL operations, two custom-developed laboratory information management systems (LIMS) for similar facilities were reviewed; four commercially available LIMS products were also evaluated. This project is motivated by new regulations for radiation protection and training and by increased emphasis on quality assurance (QA). HPAL data are used to: protect the health of radiation workers; document contamination levels for transportation of radioactive materials and for release of materials to the public for uncontrolled use; and verify compliance with environmental emission regulations. Phase 1 of the HPAL upgrade project concentrates on four types of counting instruments which support in excess of 90% of the sample workload at the existing central laboratories. Phase 2 is a refinement phase and also integrates summary-level databases on the central Health, Safety, and Environment (HSE) VAX. Phase 3 incorporates additional instrument types and integrates satellite laboratories into the HPAL LIMS. Phase 1 will be a multi-year, multimillion dollar project. The temptation to approach the upgrade of the HPAL program in a piece meal fashion should be avoided. This is a major project, with clearly-defined goals and priorities, and should be approached as such. Major programmatic and operational impacts will be felt throughout HSE as a result of this upgrade, so effective coordination with key customer contacts will be critical

  13. Magnetic Measurements of Storage Ring Magnets for the APS Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Doose, C.; Dejus, R.; Jaski, M.; Jansma, W.; Collins, J.; Donnelly, A.; Liu, J.; Cease, H.; Decker, G.; Jain, A.; DiMarco, J.

    2017-06-01

    Extensive prototyping of storage ring magnets is ongoing at the Advanced Photon Source (APS) in support of the APS Multi-Bend Achromat (MBA) upgrade project (APS-U) [1]. As part of the R&D activities four quadrupole magnets with slightly different geometries and pole tip materials, and one sextupole magnet with vanadium permendur (VP) pole tips were designed, built and tested. Magnets were measured individually using a rotating coil and a Hall probe for detailed mapping of the magnetic field. Magnets were then assembled and aligned relative to each other on a steel support plate and concrete plinth using precision machined surfaces to gain experience with the alignment method chosen for the APS-U storage ring magnets. The required alignment of magnets on a common support structure is 30 μm rms. Measurements of magnetic field quality, strength and magnet alignment after subjecting the magnets and assemblies to different tests are presented.

  14. Operational Experience with Radioactive Source Calibration of the CMS Hadron Endcap Calorimeter Wedges with Phase I Upgrade Electronics

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The Phase I Upgrade of the CMS Hadron Endcap Calorimeters consists of new photodetectors and front-end electronics. The upgrade will allow the elimination of the high amplitude noise and drifting response of the Hybrid Photo-Diodes, at the same time enabling the mitigation of the radiation damage of the scintillators and the wavelength shifting fibers with a larger spectral acceptance of the Silicon Photomultipliers. The upgrade will also allow increasing the longitudinal segmentation of the readout to be beneficial for pile-up mitigation and recalibration due to depth-dependent radiation damage. As a realistic operational exercise, the responses of the Hadron Endcap Calorimeter wedges were calibrated with a 60Co radioactive source both with current and upgrade electronics. The exercise provided significant experience towards the full upgrade during the Year End Technical Stop 2017-2018. Here we describe the instrumentation details and the operational experiences related to the sourcing exercise.

  15. Software and man-machine interface considerations for a nuclear plant computer replacement and upgrade project

    International Nuclear Information System (INIS)

    Diamond, G.; Robinson, E.

    1984-01-01

    Some of the key software functions and Man-Machine Interface considerations in a computer replacement and upgrade project for a nuclear power plant are described. The project involves the installation of two separate computer systems: an Emergency Response Facilities Computer System (ERFCS) and a Plant Process Computer System (PPCS). These systems employ state-of-the-art computer hardware and software. The ERFCS is a new system intended to provide enhanced functions to meet NRC post-TMI guidelines. The PPCS is intended to replace and upgrade an existing obsolete plant computer system. A general overview of the hardware and software aspects of the replacement and upgrade is presented. The work done to develop the upgraded Man-Machine Interface is described. For the ERFCS, a detailed discussion is presented of the work done to develop logic to evaluate the readiness and performance of safety systems and their supporting functions. The Man-Machine Interface considerations of reporting readiness and performance to the operator are discussed. Finally, the considerations involved in the implementation of this logic in real-time software are discussed.. For the PPCS, a detailed discussion is presented of some new features

  16. UPGRADES

    CERN Multimedia

    J. Butler and J. Nash

    2011-01-01

    Recent progress on the CMS upgrades was summarised, in a workshop held at Fermilab between 7th and 10th November, attended by more than 150 people, many of whom came from Europe and Asia. Important goals of the workshop were to begin to formulate a schedule for the upgrades and to determine project interdependencies. Input was received from all the upgrade working groups and will be combined into a first-pass schedule over the next several weeks. In addition, technical progress on each of the major subtasks was presented and plans for the near-term future were established. Slides from the more than 100 talks are located at: https://indico.cern.ch/conferenceDisplay.py?confId=153564 In the opening plenary session, Frank Zimmermann, of the CERN Beams Department, gave his view of the LHC luminosity evolution. The luminosity will increase faster than we assumed in designing the upgrades. CMS will need to re-evaluate the current upgrade plans and revise them if necessary. CMS Upgrade Physics coordinator...

  17. The Materials Science beamline upgrade at the Swiss Light Source

    Energy Technology Data Exchange (ETDEWEB)

    Willmott, P. R., E-mail: philip.willmott@psi.ch; Meister, D.; Leake, S. J.; Lange, M.; Bergamaschi, A. [Swiss Light Source, Paul Scherrer Institut, CH-5232 Villigen (Switzerland); and others

    2013-07-16

    The wiggler X-ray source of the Materials Science beamline at the Swiss Light Source has been replaced with a 14 mm-period cryogenically cooled in-vacuum undulator. In order to best exploit the increased brilliance of this new source, the entire front-end and optics have been redesigned. The Materials Science beamline at the Swiss Light Source has been operational since 2001. In late 2010, the original wiggler source was replaced with a novel insertion device, which allows unprecedented access to high photon energies from an undulator installed in a medium-energy storage ring. In order to best exploit the increased brilliance of this new source, the entire front-end and optics had to be redesigned. In this work, the upgrade of the beamline is described in detail. The tone is didactic, from which it is hoped the reader can adapt the concepts and ideas to his or her needs.

  18. Upgrade of the BATMAN test facility for H- source development

    Science.gov (United States)

    Heinemann, B.; Fröschle, M.; Falter, H.-D.; Fantz, U.; Franzen, P.; Kraus, W.; Nocentini, R.; Riedl, R.; Ruf, B.

    2015-04-01

    The development of a radio frequency (RF) driven source for negative hydrogen ions for the neutral beam heating devices of fusion experiments has been successfully carried out at IPP since 1996 on the test facility BATMAN. The required ITER parameters have been achieved with the prototype source consisting of a cylindrical driver on the back side of a racetrack like expansion chamber. The extraction system, called "Large Area Grid" (LAG) was derived from a positive ion accelerator from ASDEX Upgrade (AUG) using its aperture size (ø 8 mm) and pattern but replacing the first two electrodes and masking down the extraction area to 70 cm2. BATMAN is a well diagnosed and highly flexible test facility which will be kept operational in parallel to the half size ITER source test facility ELISE for further developments to improve the RF efficiency and the beam properties. It is therefore planned to upgrade BATMAN with a new ITER-like grid system (ILG) representing almost one ITER beamlet group, namely 5 × 14 apertures (ø 14 mm). Additionally to the standard three grid extraction system a repeller electrode upstream of the grounded grid can optionally be installed which is positively charged against it by 2 kV. This is designated to affect the onset of the space charge compensation downstream of the grounded grid and to reduce the backstreaming of positive ions from the drift space backwards into the ion source. For magnetic filter field studies a plasma grid current up to 3 kA will be available as well as permanent magnets embedded into a diagnostic flange or in an external magnet frame. Furthermore different source vessels and source configurations are under discussion for BATMAN, e.g. using the AUG type racetrack RF source as driver instead of the circular one or modifying the expansion chamber for a more flexible position of the external magnet frame.

  19. Upgrade of the BATMAN test facility for H− source development

    International Nuclear Information System (INIS)

    Heinemann, B.; Fröschle, M.; Falter, H.-D.; Fantz, U.; Franzen, P.; Kraus, W.; Nocentini, R.; Riedl, R.; Ruf, B.

    2015-01-01

    The development of a radio frequency (RF) driven source for negative hydrogen ions for the neutral beam heating devices of fusion experiments has been successfully carried out at IPP since 1996 on the test facility BATMAN. The required ITER parameters have been achieved with the prototype source consisting of a cylindrical driver on the back side of a racetrack like expansion chamber. The extraction system, called “Large Area Grid” (LAG) was derived from a positive ion accelerator from ASDEX Upgrade (AUG) using its aperture size (ø 8 mm) and pattern but replacing the first two electrodes and masking down the extraction area to 70 cm2. BATMAN is a well diagnosed and highly flexible test facility which will be kept operational in parallel to the half size ITER source test facility ELISE for further developments to improve the RF efficiency and the beam properties. It is therefore planned to upgrade BATMAN with a new ITER-like grid system (ILG) representing almost one ITER beamlet group, namely 5 × 14 apertures (ø 14 mm). Additionally to the standard three grid extraction system a repeller electrode upstream of the grounded grid can optionally be installed which is positively charged against it by 2 kV. This is designated to affect the onset of the space charge compensation downstream of the grounded grid and to reduce the backstreaming of positive ions from the drift space backwards into the ion source. For magnetic filter field studies a plasma grid current up to 3 kA will be available as well as permanent magnets embedded into a diagnostic flange or in an external magnet frame. Furthermore different source vessels and source configurations are under discussion for BATMAN, e.g. using the AUG type racetrack RF source as driver instead of the circular one or modifying the expansion chamber for a more flexible position of the external magnet frame

  20. Work plan for upgrade of SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control Systemm (DACS-1)

    International Nuclear Information System (INIS)

    Truitt, R.W.

    1994-08-01

    The purpose of this effort is to upgrade the existing DACS-1 used for control and data acquisition in support of the hydrogen mitigation program for tank 101-SY. The planned upgrades will enhance the system capabilities to support additional mitigation projects and improve the system operability by implementing changes identified during operation of the system to date. Once the upgrades have been implemented, the DACS-1 system should operate as it did prior to the upgrade, but with greatly increased speed and capability. No retraining of Test Engineers will be required; the upgrade is designed to be transparent to those who operate it, with only a noticeable increase in the speed of the system. This work plan defines the tasks required for implementing the upgrade. It identifies deliverables, responsible organizations and individuals, interfaces, and schedule. This upgrade effort employs system engineering principles wherever applicable

  1. New Upgrade Project for the Photon Factory Storage Ring

    International Nuclear Information System (INIS)

    Asaoka, S.; Haga, K.; Harada, K.; Honda, T.; Hori, Y.; Izawa, M.; Kasuga, T.; Kobayashi, M.; Kobayashi, Y.; Maezawa, H.; Minagawa, Y.; Mishina, A.; Mitsuhashi, T.; Miyajima, T.; Miyauchi, H.; Nagahashi, S.; Nogami, T.; Obina, T.; Pak, C. O.; Sakanaka, S.

    2004-01-01

    A new project for upgrading the 2.5-GeV Photon Factory (PF) storage ring is now being undertaken to create six new short-straight sections and to lengthen the existing eight straight sections. The short-straight sections will provide an opportunity to install short-period narrow-gap undulators, while the extensions of existing straight sections will be taken advantage of updating current insertion devices to the latest models in future. To this end, the lattice configuration around the straight sections is modified by replacing old quadrupole magnets with new shorter ones and placing them closer to the near-by bending magnets. Necessary replacement of the vacuum ducts and the beamline front ends will be carried out together. This project will be completed by the end of September, 2005, after six months of shutdown

  2. Performance Studies of Micromegas Chambers for the New Small Wheel Upgrade Project

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00349891; The ATLAS collaboration; Leontsinis, Stefanos

    2015-01-01

    Micromegas, an abbreviation for Micro MEsh Gaseous Structure (MM), is a robust detector with excellent spatial resolution and high rate capability. An $R\\&D$ activity, called Muon ATLAS MicroMegas Activity (MAMMA), was initiated in 2007 in order to explore the potential of the MM technology for use in the ATLAS experiment. After several years of prototyping and testing, the ATLAS collaboration has chosen the MM technology along with the small-strip Thin Gap Chambers (sTGC) for the upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel (NSW) upgrade project. It will employ eight layers of MM and eight layers of sTGC detectors per wheel. The NSW project requires fully efficient MM chambers, able to cope with the maximum expected rate of $15\\,\\mathrm{kHz/cm^2}$ featuring single plane spatial resolution better than $100\\,\\mu\\mathrm{m}$. The MM detectors will cover a total active area of $\\sim1200\\,\\mathrm{m^2}$ and will be operated in a moderate magnetic field with intens...

  3. The SPARX Project R&D Activity towards X-rays FEL Sources

    CERN Document Server

    Alesini, David; Bertolucci, Sergio; Biagini, M E; Boni, R; Boscolo, Manuela; Castellano, Michele; Clozza, A; Di Pirro, G; Drago, A; Esposito, A; Ferrario, Massimo; Filippetto, D; Fusco, V; Gallo, A; Ghigo, A; Guiducci, Susanna; Incurvati, M; Ligi, C; Marcellini, F; Migliorati, Mauro; Mostacci, Andrea; Palumbo, Luigi; Pellegrino, L; Preger, Miro; Raimondi, Pantaleo; Ricci, R; Sanelli, C; Serio, Mario; Sgamma, F; Spataro, Bruno; Stecchi, A; Stella, A; Tazzioli, Franco; Vaccarezza, Cristina; Vescovi, Mario; Vicario, C

    2004-01-01

    SPARX is an evolutionary project proposed by a collaboration among ENEA-INFN-CNR-Università di Roma Tor Vergata aiming at the construction of a FEL-SASE X-ray source in the Tor Vergata Campus. The first phase of the SPARX project, funded by Government Agencies, will be focused on the R&D activity on critical components and techniques for future X-ray facilities. The R&D plans for the FEL source will be developped along two lines: (a) use of the SPARC high brightness photo-injector to develop experimental test on RF compression techniques and other beam physics issues, like emittance degradation in magnetic compressors due to CSR; (b) development of new undulator design concepts and up-grading of the FEL SPARC source to enhance the non linear harmonic generation mechanism, design and test of e-beam conditioning, prebunching and seeding. A parallel program will be aimed at the development of high repetition rate S-band gun, high Quantum Efficiency cathodes, high gradient X-band RF acceleratin...

  4. An ion source upgrade for an axial injection based commercial cyclotron

    International Nuclear Information System (INIS)

    Dehnel, M.P.; Stewart, T.; Roeder, M.; Le Du, K.

    2005-01-01

    The TRIUMF H - volume-cusp ion source technology licensed by Dehnel Consulting Ltd ranges in output current from 1 to 15 mA with beam energies in the 22-30 keV range. For those Cyclone 30 cyclotrons installed with an early 1980's style Lawrence Berkeley Lab (LBL) volume-cusp ion source, an upgrade to a 5 mA TRIUMF H - volume-cusp ion source would pay dividends in terms of longer filament, filament post and ion source lens lifetime, as well as less eroded material build-up in the source. In addition, the 5 mA ion source would approximately double the beam current available to inject into the cyclotron while reducing the emittance by about a factor of four. The new system has the potential to significantly boost radioisotope production at Cyclone 30 facilities utilizing the older style LBL ion source

  5. The Los Alamos National Laboratory Chemistry and Metallurgy Research Facility upgrades project - A model for waste minimization

    International Nuclear Information System (INIS)

    Burns, M.L.; Durrer, R.E.; Kennicott, M.A.

    1996-07-01

    The Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Facility, constructed in 1952, is currently undergoing a major, multi-year construction project. Many of the operations required under this project (i.e., design, demolition, decontamination, construction, and waste management) mimic the processes required of a large scale decontamination and decommissioning (D ampersand D) job and are identical to the requirements of any of several upgrades projects anticipated for LANL and other Department of Energy (DOE) sites. For these reasons the CMR Upgrades Project is seen as an ideal model facility - to test the application, and measure the success of - waste minimization techniques which could be brought to bear on any of the similar projects. The purpose of this paper will be to discuss the past, present, and anticipated waste minimization applications at the facility and will focus on the development and execution of the project's open-quotes Waste Minimization/Pollution Prevention Strategic Plan.close quotes

  6. Upgrading the ATLAS control system

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.

    1993-01-01

    Heavy-ion accelerators are tools used in the research of nuclear and atomic physics. The ATLAS facility at the Argonne National Laboratory is one such tool. The ATLAS control system serves as the primary operator interface to the accelerator. A project to upgrade the control system is presently in progress. Since this is an upgrade project and not a new installation, it was imperative that the development work proceed without interference to normal operations. An additional criteria for the development work was that the writing of additional ''in-house'' software should be kept to a minimum. This paper briefly describes the control system being upgraded, and explains some of the reasons for the decision to upgrade the control system. Design considerations and goals for the new system are described, and the present status of the upgrade is discussed

  7. Prioritizing and scheduling Portsmouth Gaseous Diffusion Plant safeguards upgrades

    International Nuclear Information System (INIS)

    Edmunds, T.; Saleh, R.; Zevanove, S.

    1992-02-01

    As part of the Site Safeguards and Security Plan (SSSP), facilities are required to develop a Resource Plan (RP). The Resource Plan provides documentation and justification for the facility's planned upgrades, including the schedule, priority, and cost estimates for the safeguards and security upgrades. Portsmouth Gaseous Diffusion Plant (PORTS) management has identified and obtained funding approval for a number of safeguards and security upgrades, including line-item construction projects. These upgrade projects were selected to address a variety of concerns identified in the PORTS vulnerability assessments and other reviews performed in support of the SSSP process. However, budgeting and scheduling constraints do not make it possible to simultaneously begin implementation of all of the upgrade projects. A formal methodology and analysis are needed to explicitly address the trade-offs between competing safeguards objectives, and to prioritize and schedule the upgrade projects to ensure that the maximum benefit can be realized in the shortest possible time frame. The purpose of this report is to describe the methodology developed to support these upgrade project scheduling decisions. The report also presents the results obtained from applying the methodology to a set of the upgrade projects selected by PORTS S ampersand S management. Data for the analysis are based on discussions with personnel familiar with the PORTS safeguards and security needs, the requirements for implementing these upgrades, and upgrade funding limitations. The analysis results presented here assume continued highly enriched uranium (HEU) operations at PORTS. However, the methodology developed is readily adaptable for the evaluation of other operational scenarios and other resource allocation issues relevant to PORTS

  8. Performance Studies of Micromegas Chambers for the New Small Wheel Upgrade Project

    Directory of Open Access Journals (Sweden)

    Leontsinis S.

    2016-01-01

    Full Text Available The ATLAS collaboration has chosen the Micromegas technology along with the small-strip Thin Gap Chambers for the upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel upgrade project. It will employ eight layers of Micromegas and eight layers of small-strip Thin Gap Chambers per wheel. The New Small Wheel project requires fully efficient Micromegas chambers, able to cope with the maximum expected rate of 15 kHz/cm2 featuring single plane spatial resolution better than 100 μm. The Micromegas detectors will cover a total active area of ~ 1200 m2 and will be operated in a moderate magnetic field (≤ 0.3 T. Moreover, together with their precise tracking capability the New Small Wheel Micromegas chambers will contribute to the ATLAS Level-1 trigger system. Several studies have been performed on small (10 × 10 cm2 and medium (1 × 0.5 m2 size prototypes using medium (1 − 5 GeV/c and high momentum (120 – 150 GeV/c hadron beams at CERN. A brief overview of the results obtained is presented.

  9. UPGRADES

    CERN Document Server

    D. Contardo and J. Spalding

    2013-01-01

    There is very good progress in the execution of the LS1 projects and in launching construction of the Phase 1 upgrades. We focus here on two main achievements since the last CMS Week. The approval of the third Phase 1 TDR The preparation of the L1 Trigger Upgrade Technical Design Report has been a major effort of the collaboration at the beginning of this year, especially to develop supporting Trigger menu and physics performance studies. These studies have demonstrated the efficiency of the upgraded system to ensure low lepton and jet trigger thresholds, leading to a significant increase of the acceptance for the Higgs measurements, in the associated production mode and in the ττ decays, as well as for the stop searches involving multiple jets in the final state. The TDR was submitted to the LHCC in May and approved at the June committee meeting. It is now a public document, completing the series of the three TDRs describing the Phase 1 upgrades, with the new Pixel system and the HCAL rea...

  10. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Science.gov (United States)

    2010-06-10

    ... financial condition and has the ability to secure the necessary financing to meet the Project's requirements... for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy..., Department of Energy. ACTION: Request for Project Proposals. SUMMARY: The Department of Energy (DOE or...

  11. Students Upgrading through Computer and Career Education System Services (Project SUCCESS). Final Evaluation Report 1993-94. OER Report.

    Science.gov (United States)

    Greene, Judy

    Students Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its fourth year of operation. The project operated at two high schools in Brooklyn and one in Manhattan (New York). In the 1993-94 school year, the project served 393 students of…

  12. UPGRADES

    CERN Multimedia

    Didier Contardo

    2012-01-01

      The CMS Upgrade Programme is making good progress on the LS1 and Phase 1 projects, in the planning for Phase 2. The construction of the ME4/2 muon chambers to be installed during LS1 has started and the two first CSC production chambers have been fully qualified. The three muon groups have recently established a set of milestones towards the completion of their project, that will be integrated in the detailed planning and scheduling for the shutdown work established by Technical Coordination. The project to replace the photo-detectors in the HF and HO calorimeters is also well advanced and at the validation stage. The operation of an HF slice with new multi-anode PMTs and back-end electronics has already been demonstrated in 2012. For the Phase 1 data-taking, as discussed in the Chamonix workshop, it is likely that the LHC performance will exceed the nominal luminosity and pile-up before the second shutdown, still scheduled in 2018. The collaboration is therefore pursuing a strategy to upgrade ...

  13. Slum upgrading in developing countries: lessons from Ghana and ...

    African Journals Online (AJOL)

    The paper identifies common elements in the upgrading programmes in the literature. It assesses two slum upgrading projects from Ghana and Kenya to determine how the elements were factored into the projects' implementation. The article concludes that stakeholders involved in slum upgrading in Africa should consider ...

  14. Kansas State University accelerator laboratory upgrade

    International Nuclear Information System (INIS)

    Richard, P.

    1989-01-01

    The J.R. Macdonald Laboratory is undergoing a major upgrade of its facilities and capabilities. The laboratory is dedicated to the study of ion-atom collisions using highly charged ions from accelerators and/or ion sources. The mainstay of the laboratory over the last two decades has been a 6 MV tandem accelerator. It has been used to produce one- to a few-MeV/u highly charged ions for studying high energy atomic collisions, and to produce recoil ions from ocllisions with projectile ions for studying low energy atomic collisions. In order to enhance the capabilities of studying atomic collisions in these two energy regimes, we are constructing a superconducting LINAC booster to the tandem, and a stand-alone CRYEBIS source. The project, which is funded by the US Department of Energy, began in May 1985 with a May 1989 completion schedule. The upgrade includes a building addition, funded by the State of Kansas, to house the new facilities. The LINAC consists of a time-superbunching module, followed by three large cryostat modules each containing four superconducting resonators, and followed by an energy-rebunching module. The resonators are the split-ring superconducting Nb type designed and constructed at Argonne National Laboratory, and are presently being tested at KSU. The CRYEBIS source, which consists of a 1 m long 5 T superconducting solenoid with a high degree of straightness, is in the final stages of assembly. We have in operation a new computer network for data acquisition and analysis. A progress report on the status of the upgrade is presented. (orig.)

  15. Students Upgrading through Computer and Career Education System Services (Project SUCCESS). Final Evaluation Report 1992-93. OER Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Student Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its third year of operation. Project SUCCESS served 460 students of limited English proficiency at two high schools in Brooklyn and one high school in Manhattan (New York City).…

  16. Bi-Provincial Upgrader

    International Nuclear Information System (INIS)

    1997-01-01

    Husky Oil's Bi-Provincial Upgrader is located in the rural municipality of Wilton, east of Lloydminster, Saskatchewan. It is jointly owned by Husky Oil and the Saskatchewan government. The upgrader is designed to produce 7.300 m 3 /cd of synthetic crude from 8.440 m 3 /cd of diluted Lloyd blend and distillates from the existing Lloydminster refinery. The designed coke and sulphur production is 415 t/day and 240 t/day respectively. Chronology of the Bi-Provincial Upgrader project was presented, along with details of the heavy oil feedstock properties for Cold Lake, Lloydminster and Lloyd Blend. Upgrader production history since start-up, synthetic crude oil customers, and the evolution of prices for Edmonton light vs. Husky LLB at Hardisty were also reviewed. 3 tabs., 9 figs

  17. Operational Experience with Radioactive Source Calibration of the CMS Hadron Endcap Calorimeter Wedges with Phase I Upgrade Electronics

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The Phase I Upgrade of the CMS Hadron Endcap Calorimeters consist of new photodetectors (Silicon Photomultipliers in place of Hybrid Photo-Diodes) and front-end electronics (QIE11). The upgrade will allow the elimination of the high amplitude noise and drifting response of the Hybrid Photo-Diodes, at the same time enabling the mitigation of the radiation damage of the scintillators and the wavelength shifting fibers with a larger spectral acceptance of the Silicon Photomultipliers. The upgrade will also allow to increase the longitudinal segmentation of the readout to be beneficial for pile-up mitigation and recalibration due to depth-dependent radiation damage.As a realistic operational exercise, the responses of the Hadron Endcap Calorimeter wedges are being calibrated with a $^{60}$Co radioactive source both with current and upgrade electronics. The exercise will provide a manifestation of the benefits of the upgrade. Here we describe the instrumentation details and the operational experiences related to t...

  18. Upgrade of the beam extraction system of the GTS-LHC electron cyclotron resonance ion source at CERN.

    Science.gov (United States)

    Toivanen, V; Bellodi, G; Dimov, V; Küchler, D; Lombardi, A M; Maintrot, M

    2016-02-01

    Linac3 is the first accelerator in the heavy ion injector chain of the Large Hadron Collider (LHC), providing multiply charged heavy ion beams for the CERN experimental program. The ion beams are produced with GTS-LHC, a 14.5 GHz electron cyclotron resonance ion source, operated in afterglow mode. Improvement of the GTS-LHC beam formation and beam transport along Linac3 is part of the upgrade program of the injector chain in preparation for the future high luminosity LHC. A mismatch between the ion beam properties in the ion source extraction region and the acceptance of the following Low Energy Beam Transport (LEBT) section has been identified as one of the factors limiting the Linac3 performance. The installation of a new focusing element, an einzel lens, into the GTS-LHC extraction region is foreseen as a part of the Linac3 upgrade, as well as a redesign of the first section of the LEBT. Details of the upgrade and results of a beam dynamics study of the extraction region and LEBT modifications will be presented.

  19. Five TWh saved on profitable upgrading

    International Nuclear Information System (INIS)

    Bakken, Stein Arne.

    1999-01-01

    Article. In Norway, a project is planned to evaluate the upgrading potential of the hydroelectric power sector. The article criticizes the authorities for not supporting the upgrading of hydroelectric power plants in their eager to promote the development of wind power. An important contribution of the planned project will be a book from which the utilities may get advice on measures of upgrading. Generators and control systems account for 80% of the faults and interruptions in the power utilities. The turbine technology has made important progress in the 1990s. By pure upgrading measures alone, the turbine efficiencies may be increased enough for an additional 3 TWh to be taken out from the Norwegian hydroelectric power system. Today, the price of imported carbon-based Danish power determines whether the utilities find it profitable to rehabilitate the hydroelectric plants. The energy potential of upgrading is estimated to be 5 TWh. This energy can be generated with known technology and with no serious consequences for the environment

  20. Recovery Act. Tapoco project. Cheoah upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tran, Paul [Alcoa Inc., Alcoa Center, PA (United States)

    2013-10-02

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  1. Completion of the brightness upgrade of the ALS

    International Nuclear Information System (INIS)

    Steier, C; Madur, A; Bailey, B; Berg, K; Biocca, A; Black, A; Casey, P; Colomb, D; Gunion, B; Li, N; Marks, S; Nishimura, H; Pappas, C; Petermann, K; Portmann, G; Prestemon, S; Rawlins, A; Robin, D; Rossi, S; Scarvie, T

    2014-01-01

    The Advanced Light Source (ALS) at Berkeley Lab remains one of the brightest sources for soft x-rays worldwide. A multiyear upgrade of the ALS is underway, which includes new and replacement x-ray beamlines, a replacement of many of the original insertion devices and many upgrades to the accelerator. The accelerator upgrade that affects the ALS performance most directly is the ALS brightness upgrade [1], which reduces the horizontal emittance from 6.3 to 2.0 nm (2.5 nm effective). Magnets for this upgrade were installed in late 2012 and early 2013 followed by user operation with the reduced emittance.

  2. Upgrading of Intermediate Bio-Oil Produced by Catalytic Pyrolysis

    Energy Technology Data Exchange (ETDEWEB)

    Abdullah, Zia [Battelle Memorial Inst., Columbus, OH (United States); Chadwell, Brad [Battelle Memorial Inst., Columbus, OH (United States); Taha, Rachid [Battelle Memorial Inst., Columbus, OH (United States); Hindin, Barry [Battelle Memorial Inst., Columbus, OH (United States); Ralston, Kevin [Battelle Memorial Inst., Columbus, OH (United States)

    2015-06-30

    The objectives of this project were to (1) develop a process to upgrade catalytic pyrolysis bio-oil, (2) investigate new upgrading catalysts suited for upgrading catalytic pyrolysis bio-oil, (3) demonstrate upgrading system operation for more than 1,000 hours using a single catalyst charge, and (4) produce a final upgraded product that can be blended to 30 percent by weight with petroleum fuels or that is compatible with existing petroleum refining operations. This project has, to the best of our knowledge, for the first time enabled a commercially viable bio-oil hydrotreatment process to produce renewable blend stock for transportation fuels.

  3. Analogue to digital upgrade project-boiler feedwater control system for Bruce Power nuclear units 1 & 2

    International Nuclear Information System (INIS)

    Long, R.

    2012-01-01

    Bruce Power Nuclear Generating Station A, “Bruce A” is in the final stages of its Restart Project. This capital project will see a large scale rehabilitation of Units 1 and 2 resulting in addition of 1500MW of safe, reliable, clean electricity to the Ontario grid. Restart Project Scope 375, Boiler Feedwater Controls Upgrade was sanctioned to replace obsolete analog devices with a modern digital control system. This project replaced the existing Foxboro H Line analog controls which comprised of 81 individual control modules and support instrumentation. The replacement system was a Triconex Triple Modular Redundant PLC which interfaces with two redundant touch screen monitors. The upgraded digital system incorporates the following controls: 1. Boiler Level Control Loops 2. Dearator Level Control Loops 3. Dearator Pressure Control Loops 4. Boiler Feedwater Recirculation Flow Control Loops A number of technical challenges were addressed when installing a new digital system within the existing plant configuration. Interfaces to new, old and refurbished field devices must be understood as well as implications of connecting to the plant’s Digital Control Computers (DCC’s) and newly installed Steam Generators. The overall project involved many stakeholders to address various requirements from conceptual / design stage through procurement, construction, commissioning and return to service. In addition, the project highlighted the unique requirements found in Nuclear Industry with respect to Human Factors and Software Quality Assurance. (author)

  4. Completion of the ATLAS control system upgrade

    International Nuclear Information System (INIS)

    Munson, F. H.

    1998-01-01

    In the fall of 1992 at the SNEAP(Symposium of North Eastern Accelerator Personnel) a project to up grade the ATLAS (Argonne Tandem Linear Accelerator System) control system was first reported. Not unlike the accelerator it services the control system will continue to evolve. However, the first of this year has marked the completion of this most recent upgrade project. Since the control system upgrade took place during a period when ATLAS was operating at a record number of hours, special techniques were necessary to enable the development of the new control system ''on line'' while still saving the needs of normal operations. This paper reviews the techniques used for upgrading the ATLAS control system while the system was in use. In addition a summary of the upgrade project and final configuration, as well as some of the features of the new control system is provided

  5. Low-Cost Mapping and Publishing Methods for Landscape Architectural Analysis and Design in Slum-Upgrading Projects

    Directory of Open Access Journals (Sweden)

    Jörg Rekittke

    2011-10-01

    Full Text Available The research project “Grassroots GIS” focuses on the development of low-cost mapping and publishing methods for slums and slum-upgrading projects in Manila. In this project smartphones, collaborative mapping and 3D visualization applications are systematically employed to support landscape architectural analysis and design work in the context of urban poverty and urban informal settlements. In this paper we focus on the description of the developed methods and present preliminary results of this work-in-progress.

  6. SLHC, the High-Luminosity Upgrade (public event)

    CERN Multimedia

    CERN. Geneva

    2010-01-01

    In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  7. Advanced conceptual design report: T Plant secondary containment and leak detection upgrades. Project W-259

    International Nuclear Information System (INIS)

    Hookfin, J.D.

    1995-01-01

    The T Plant facilities in the 200-West Area of the Hanford site were constructed in the early 1940s to produce nuclear materials in support of national defense activities. T Plant includes the 271-T facility, the 221-T facility, and several support facilities (eg, 2706-T), utilities, and tanks/piping systems. T Plant has been recommended as the primary interim decontamination facility for the Hanford site. Project W-259 will provide capital upgrades to the T Plant facilities to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. This document provides an advanced conceptual design concept that complies with functional requirements for the T Plant Secondary Containment and Leak Detection upgrades

  8. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2012-01-01

      Good progress is being made on the projects that will be installed during LS1. CSC chamber production for ME4/2 is progressing at a rate of four chambers per month, with 25 built so far, and the new electronics for ME1/1 is undergoing a pre-production integration testing. For the RPC chambers, gap production is underway with first deliveries to the chamber assembly sites at CERN and Ghent. The third site at Mumbai will begin production next month. For the PMT replacement in the forward hadron calorimeters (HF), the 1728 PMTs are all characterised and ready to be installed. Testing of the electronics boards is going well. Preparations to replace the HPDs in the outer calorimeter (HO) with SiPMs are also on-track. All components are at CERN and burn-in of the new front-end electronics is proceeding. There are three major upgrade projects targeting the period from LS1 through LS2: a new pixel detector, upgraded photo-detectors and electronics for HCAL, and development of a new L1 Trigger. The new ...

  9. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

    The three post-LS1 Phase 1 Upgrade projects (the L1-Trigger, Pixel Tracker, and HCAL) are all making excellent progress and are transitioning from the prototype to the execution phase. Meanwhile plans are developing for Phase 2, a major Upgrade programme targeting the third long shutdown, LS3. News on Phase 1 is included under the respective projects; we only provide a brief summary here. Phase 1 The plan for the L1 Trigger relies on the installation during the present shutdown of optical splitting for the Trigger input signals. This will allow the new Trigger system to be brought online and fully commissioned during beam operation in 2015, while CMS relies on the existing legacy Trigger for physics. Once fully commissioned the experiment can switch over to the new Trigger, which will provide greatly improved performance at high event pile-up, by 2016. System tests of the splitter system, and of the new architecture of the calorimeter trigger were very successful, and the work in LS1 is on-track. Prototype ...

  10. The Bevalac Upgrade Project

    International Nuclear Information System (INIS)

    Alonso, J.R.; Dwinell, R.D.; Feinberg, B.

    1987-03-01

    This paper describes a proposed upgrade of the Bevalac accelerator complex in which the present Bevatron is replaced with a modern, strong-focusing 17 T-m synchrotron. This new ring is designed to accelerate all ions throughout the periodic table with intensities 100 to 1000 times higher than the present Bevatron. It will also provide a substantially improved beam spill structure and will reduce operating costs. A fast extraction capability can be used to inject a future heavy ion storage ring. Pulse-to-pulse switching of energy and ion species is an important goal. The existing injectors, shielding, experimental facilities and utilities of the present Bevalac will remain substantially intact

  11. Operational test report, integrated system test (ventilation upgrade)

    International Nuclear Information System (INIS)

    HARTY, W.M.

    1999-01-01

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, AY102, AZ101, AZ102

  12. Operational test report integrated system test (ventilation upgrade)

    Energy Technology Data Exchange (ETDEWEB)

    HARTY, W.M.

    1999-10-05

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

  13. Conceptual design report, 219-S secondary containment upgrade, Project W-178

    International Nuclear Information System (INIS)

    Beyer, J.J.

    1993-05-01

    The 219-S Facility is located in the 200-West Area on the Hanford Site and was constructed in 1951. The facility receives and treats liquid, low-level mixed waste from the 222-S Laboratory prior to transfer of that waste to the SY Tank Farm. The 219-S Facility consists of Cell A containing Tanks 101 and 102 and Cell B containing Tank 103 and a spare space. Project W-178 will modify the 219-S Facility to bring it into compliance with the tank system standards in WAC 173-303-640. The secondary containment upgrade will consist of a stainless steel cell liner in both Cell A and the spare space in Cell B. Additionally, Cell B will be modified by taking Tank 103 out of service and installing a new tank: Tank 104. The construction work will be accomplished in phases to minimize service interruption to the 222-S Laboratory. The proposed design and construction method is the most cost effective of four alternatives evaluated during a value engineering session. Project W-178 is a fiscal year 1995 Line Item. Total estimated construction costs of the project are $2,600,000; other project costs are $710,000. The total project cost is $3,300,000

  14. RF sources for recent linear accelerator projects

    International Nuclear Information System (INIS)

    Terrien, J.C.; Faillon, G.; Guidee, P.

    1992-01-01

    We present the state of the art of high power klystrons at Thomson Tubes Electroniques, along with the main technological limitations for peak power and pulse width. Then we describe the work that is under way to upgrade performance and some of the alternative RF sources that have been developed. (Author) 3 refs., 4 figs., 2 tabs

  15. The Role of Nuclear Power in Slovak Republic; Safety Upgrading Program for WWER Reactors

    International Nuclear Information System (INIS)

    Toth, A.

    1998-01-01

    Implementation of Slovenske elektrarne Production Base Development Program, where all these safety upgrading projects of nuclear power sources at Slovak Republic are included will ensure first of all safety of nuclear power sources on internationally acceptable level, operational reliability of nuclear power units, balanced consumption and production of electric energy in Slovakia and decrease of long term ecological impact in according with international commitments of Slovakia

  16. Operation status and upgrading of HIRFL

    International Nuclear Information System (INIS)

    Tang, J.Y.; Wang, Y.F.; Wei, B.W.

    2001-01-01

    The operation status and the undergoing upgrading at HIRFL machine are presented. The accelerated ion species with the machine have been expanding, including metallic ions and higher energy with the new ECR ion source. The upgrading of HIRFL as the pre-accelerator of CSR storage ring has been processing steadily. The new 14.5 GHz ECR ion source has been put in operation in early 1999. A full-superconducting ECR ion source of 18 GHz is under design. The manufacture of the new vacuum chamber for SFC is just finished and the installation is to be started. The construction of the new B1 buncher is nearly to be finished, and the off-line test and the installation will be started soon. Another two identical bunchers will be ordered after the test. The beam distribution system is under upgrading to make all experiment stations separate from the others and the time-sharing mode possible, and a new cancer-therapy station is also under construction. The other upgrading items include the yoke enlarging of SFC, beam diagnostics, computer control and beam distribution system

  17. Upgrade of Instrumentation for Purdue Reactor PUR-1

    International Nuclear Information System (INIS)

    Revankar, S.T.; Merritt, E.; Bean, R.

    2000-01-01

    The major objective of this program was to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective two projects on instrument upgrade were implemented. The first one was to convert the vacuum tube control and safety amplifiers (CSA) to solid state electronics, and the other was to upgrade the electrical and electronic shielding. This report is the annual report and gives the efforts and progress achieved on these two projects from July 1999 to June 2000

  18. The Students Upgrading through Computer and Career Education Systems Services (Project SUCCESS). 1990-91 Final Evaluation Profile. OREA Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of the New York City Public Schools' Student Upgrading through Computer and Career Education Systems Services Program (Project SUCCESS). Project SUCCESS operated at 3 high schools in Brooklyn and Manhattan (Murry Bergtraum High School, Edward R. Murrow High School, and John Dewey High School). It enrolled limited English…

  19. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  20. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  1. Development and implementation of the regulatory control of sources in Latin American Model Project countries

    International Nuclear Information System (INIS)

    Ferruz Cruz, P.

    2001-01-01

    After a general assessment of the situation regarding radiation safety and the radiation protection infrastructure in Latin American countries, several of them were invited to participate in a Model Project oriented, in some cases, towards establishing a mechanism for national regulatory control of radiation sources, and in others, towards upgrading their national control programme. All these activities aimed at reaching an effective and sustainable radiation protection infrastructure based on international basic safety standards. The paper presents a general overview of the current situation with regard to radiation protection within the Model Project countries in Latin America after almost five years of activities. It includes: the implementation of regulatory issues; the control of occupational, medical and public exposures; emergency response and waste safety issues. The paper also presents some lessons learned during implementation concerning the numerous activities involved in this interregional project. (author)

  2. The magnet system of the Tokamak T-15 upgrade

    International Nuclear Information System (INIS)

    Khvostenko, P.P.; Azizov, E.A.; Alfimov, D.E.; Belyakov, V.A.; Bondarchuk, E.N.; Chudnovsky, A.N.; Dokuka, V.N.; Kavin, A.A.; Khayrutdinov, R.R.; Khokhlov, M.V.; Kitaev, B.A.; Krasnov, S.V.; Maximova, I.I.; Labusov, A.N.; Lukash, V.E.; Mineev, A.B.; Muratov, V.P.

    2015-01-01

    Highlights: • T-15U project is the initial technical base for creating fusion neutron sources. • Magnet system of T-15U will confine the hot plasma in the divertor configuration. • Toroidal magnetic field at the plasma axis is 2 T. • T-15U should begin operations in 2016. - Abstract: Presently, the Tokamak T-15 is being upgraded. The magnet system of the Tokamak T-15 upgrade will obtain and confine the hot plasma in the divertor configuration. Plasma parameters are a major radius of 1.48 m, a minor radius of 0.67 m, an elongation of 1.7–1.9 and a triangularity of 0.3–0.4. The magnet system includes the toroidal winding and the poloidal magnet system. The poloidal magnet system generates the divertor with single null and double null magnetic configurations. The power supply system provides the necessary current scenarios in the windings of the magnet system. All elements of the magnet system will be manufactured by the end of 2015. The Tokamak T-15 upgrade should begin operations in 2016.

  3. The magnet system of the Tokamak T-15 upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Khvostenko, P.P., E-mail: ppkhvost@rambler.ru [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Azizov, E.A.; Alfimov, D.E. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Belyakov, V.A.; Bondarchuk, E.N. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); Chudnovsky, A.N.; Dokuka, V.N. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Kavin, A.A. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); Khayrutdinov, R.R. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Khokhlov, M.V.; Kitaev, B.A.; Krasnov, S.V.; Maximova, I.I.; Labusov, A.N. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); Lukash, V.E. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Mineev, A.B.; Muratov, V.P. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); and others

    2015-10-15

    Highlights: • T-15U project is the initial technical base for creating fusion neutron sources. • Magnet system of T-15U will confine the hot plasma in the divertor configuration. • Toroidal magnetic field at the plasma axis is 2 T. • T-15U should begin operations in 2016. - Abstract: Presently, the Tokamak T-15 is being upgraded. The magnet system of the Tokamak T-15 upgrade will obtain and confine the hot plasma in the divertor configuration. Plasma parameters are a major radius of 1.48 m, a minor radius of 0.67 m, an elongation of 1.7–1.9 and a triangularity of 0.3–0.4. The magnet system includes the toroidal winding and the poloidal magnet system. The poloidal magnet system generates the divertor with single null and double null magnetic configurations. The power supply system provides the necessary current scenarios in the windings of the magnet system. All elements of the magnet system will be manufactured by the end of 2015. The Tokamak T-15 upgrade should begin operations in 2016.

  4. CrossRef A new FEBIAD-type ion source for the upgrade of SPIRAL1 at GANIL

    CERN Document Server

    Chauveau, P; Babo, M; Bouzomita, H; Bajeat, O; Dubois, M; Frigot, R; Grinyer, G F; Grinyer, J; Jardin, P; Leboucher, C; Maunoury, L; Seiffert, C; Stora, T; Thomas, J C; Traykov, E

    2016-01-01

    The SPIRAL facility at GANIL is being upgraded with a new FEBIAD ion source in order to extend its production capabilities to condensable elements. The coupling of such an ion source with the present GANIL target was recently tested online at SPIRAL at nominal power (1200 W). The results are promising as the calculated yields are in the range of those extrapolated from previous measurements at lower power and sometimes higher. This experiment and its results are presented.

  5. Industry perspective on digital upgrades: A utility perspective on digital upgrades

    International Nuclear Information System (INIS)

    Blauw, R.J.

    1994-01-01

    Nuclear utilities face the need to upgrade aging and obsolete safety related and other critical equipment. This is the result of operation and maintenance concerns for reliability and maintainability. Digital technology is an option for these upgrades. A number of utilities have attempted exercising the digital option. The regulatory licensing results have been inconsistent and have raised a variety of issues. These issues and the subsequent licensing uncertainties have caused some utilities to temporarily drop digital technology as an upgrade option. Resolution of these issues and the need for regulatory stability is driving the development of industry standards and guidelines. These will provide guidance to support consistent design and implementation of digital upgrades. Successful completion of these documents is necessary for renewed consideration of the use of digital technology. This paper will present a utility perspective on how project management, configuration control, and a rigorous design process can serve to address the present regulatory issues. These issues include commercial grade dedication, reliability, electromagnetic interference, and failure and error management. This perspective is consistent with the standards and guidelines development effort

  6. Performance of HT-WGS Catalysts for Upgrading of Syngas Obtained from Biomass Gasification

    Energy Technology Data Exchange (ETDEWEB)

    Marano Bujan, M.; Sanchez Hervas, J. M.

    2009-05-21

    Oxygen pressurized gasification of biomass out stands as a very promising approach to obtain energy or hydrogen from renewable sources. The technical feasibility of this technology is being investigated under the scope of the VI FP CHRISGAS project, which has started in September 2004 and has a duration of five years. The Division of Combustion and Gasification of CIEMAT participates in this project in Work Package 13: Ancillary and novel processes, studying innovative gas separation and gas upgrading systems. Such systems include novel or available high temperature water gas shift catalysts and commercially available membranes not yet tried in this type of atmosphere. This report describes the activities carried out during the period 2005-2007 regarding the performance of high temperature water gas shift catalysts for upgrading of synthesis gas obtained from biomass gasification. (Author) 28 refs.

  7. Get a winning Oracle upgrade session using the quarterback approach

    Science.gov (United States)

    Anderson, G.

    2002-01-01

    Upgrades, upgrades... too much customer down time. Find out how we shrunk our production upgrade schedule 40% from our estimate of 10 days 12 hours to 6 days 2 hours using the quarterback approach. So your upgrade is not that complex, come anyway. This approach is scalable to any size project and will be extremely valuable.

  8. Energy upgrades as financial or strategic investment? Energy Star property owners and managers improving building energy performance

    International Nuclear Information System (INIS)

    Gliedt, Travis; Hoicka, Christina E.

    2015-01-01

    Highlights: • Energy Star property owners/managers view energy as strategic or financial investments. • Energy performance improvements and motivations differ by property type. • Energy projects are most often funded by internal cash reserves. • Motivations and funding sources differ by type of energy project. • Environmental sustainability is an important criterion in many energy projects. - Abstract: Due to its significant carbon footprint and cost-effectiveness for upgrades, the commercial property sector is important for climate change mitigation. Although barriers to energy system changes, such as funding, financing and information, are well recognized, Energy Star property owners and managers are successfully overcoming these barriers and instigating energy efficiency upgrades, renewable energy installations, and behavior and management programs. To examine the decision-making process that leads to energy performance improvements, a national survey of property owners and management organizations of buildings that earned an Energy Star score of 75 or higher was conducted. The extent to which energy upgrades were considered strategic investments motivated by environmental sustainability or corporate social responsibility, or financial investments motivated by payback period or return-on-investment criteria, was contingent upon the property type and type of energy project. Environmental sustainability was found to be an important motivation for energy projects in office spaces in general, but in the case of smaller office spaces was often combined with motivations for corporate social responsibility. Energy projects on education properties were motivated by financial investment. Building envelope and mechanical efficiency upgrades were considered financial investments, while renewable energy, green roofs, and water conservation technologies were considered environmental sustainability initiatives

  9. Pipeline transportation of emerging partially upgraded bitumen

    International Nuclear Information System (INIS)

    Luhning, R.W.; Anand, A.; Blackmore, T.; Lawson, D.S.

    2002-01-01

    The recoverable reserves of Canada's vast oil deposits is estimated to be 335 billion barrels (bbl), most of which are in the Alberta oil sands. Canada was the largest import supplier of crude oil to the United States in 2001, followed by Saudi Arabia. By 2011, the production of oil sands is expected to increase to 50 per cent of Canada's oil, and conventional oil production will decline as more production will be provided by synthetic light oil and bitumen. This paper lists the announced oil sands projects. If all are to proceed, production would reach 3,445,000 bbl per day by 2011. The three main challenges regarding the transportation and marketing of this new production were described. The first is to expand the physical capacity of existing pipelines. The second is the supply of low viscosity diluent (such as natural gas condensate or synthetic diluent) to reduce the viscosity and density of the bitumen as it passes through the pipelines. The current pipeline specifications and procedures to transport partially upgraded products are presented. The final challenge is the projected refinery market constraint to process the bitumen and synthetic light oil into consumer fuel products. These challenges can be addressed by modifying refineries and increasing Canadian access in Petroleum Administration Defense District (PADD) II and IV. The technology for partial upgrading of bitumen to produce pipeline specification oil, reduce diluent requirements and add sales value, is currently under development. The number of existing refineries to potentially accept partially upgraded product is listed. The partially upgraded bitumen will be in demand for additional upgrading to end user products, and new opportunities will be presented as additional pipeline capacity is made available to transport crude to U.S. markets and overseas. The paper describes the following emerging partial upgrading methods: the OrCrude upgrading process, rapid thermal processing, CPJ process for

  10. Upgrader alley : oil sands fever strikes Edmonton

    International Nuclear Information System (INIS)

    Griffiths, M.; Dyer, S.

    2008-01-01

    Large-scale industrial complexes called upgraders are similar to oil refineries. Several upgraders are planned for the area just northeast of Edmonton, known as Upgrader Alley. Concerns have been expressed over the potential congestion and environmental impacts of these upgraders. Upgraders will also attract other industry, and the cumulative effects of development will have major impacts on the region, its people and the natural environment. The report provided an overview of Upgrader Alley, with reference to what is driving development; upgrading issues; what Upgrader Alley will look like; and how much water Upgrader Alley needs. The report also discussed impacts on the land, air quality, and greenhouse gases. Water demand issues were discussed with reference to impacts on the North Saskatchewan River, water levels, water quality, a water management framework, and groundwater resources. Cumulative impacts were also presented. It was concluded that if all the projects for which applications had been submitted were approved, the rapid pace of growth in Upgrader Alley would mimic that of Fort McMurray. If the rate of development were somewhat slower, there would be more time to develop and implement plans to reduce the impacts. 189 refs., 6 tabs., 14 figs

  11. Events as spaces for upgrading : Automotive events in Shanghai

    NARCIS (Netherlands)

    E. van Tuijl (Erwin); K. Dittrich (Koen)

    2015-01-01

    textabstractThis study contributes to the literature dealing with upgrading of the Chinese automotive industry by analysing the role of events in the upgrading process. By combining literature on temporary clusters with that of knowledge sourcing and upgrading, we investigate how firms use events

  12. Safety system upgrades to a research reactor: A regulatory perspective

    International Nuclear Information System (INIS)

    Lamarre, G.B.; Martin, W.G.

    2003-01-01

    The NRU (National Research Universal) reactor, located at the Chalk River Laboratories of Atomic Energy of Canada Limited (AECL), first achieved criticality November 3, 1957. AECL continues to operate NRU for research to support safety and reliability studies for CANDU reactors and as a major supplier of medical radioisotopes. Following a detailed systematic review and assessment of NRU's design and the condition of its primary systems, AECL formally notified the Canadian Nuclear Safety Commission's (CNSC) predecessor - the Atomic Energy Control Board - in 1992 of its intention to upgrade NRU's safety systems. AECL proposed seven major upgrades to provide improvements in shutdown capability, heat removal, confinement, and reactor monitoring, particularly during and after a seismic event. From a CNSC perspective, these upgrades were necessary to meet modern safety standards. From the start of the upgrades project, the CNSC provided regulatory oversight aimed at ensuring that AECL maintained a structured approach to the upgrades. The elements of the approach include, but are not limited to, the determination of project milestones and target dates; the formalization of the design process and project quality assurance requirements; the requirements for updated documentation, including safety reports, safety notes and commissioning reports; and the approval and authorization process. This paper details, from a regulatory perspective, the structured approach used in approving the design, construction, commissioning and subsequent operation of safety system upgrades for an existing and operating research reactor, including the many challenges faced when attempting to balance the requirements of the upgrades project with AECL's need to keep NRU operating to meet its important research and production objectives. (author)

  13. Report on the engineering test of the LBL 30 second neutral beam source for the MFTF-B project

    International Nuclear Information System (INIS)

    Vella, M.C.; Pincosy, P.A.; Hauck, C.A.; Pyle, R.V.

    1984-08-01

    Positive ion based neutral beam development in the US has centered on the long pulse, Advanced Positive Ion Source (APIS). APIS eventually focused on development of 30 second sources for MFTF-B. The Engineering Test was part of competitive testing of the LBL and ORNL long pulse sources carried out for the MFTF-B Project. The test consisted of 500 beam shots with 80 kV, 30 second deuterium, and was carried out on the Neutral Beam Engineering Test Facility (NBETF). This report summarizes the results of LBL testing, in which the LBL APIS demonstrated that it would meet the requirements for MFTF-B 30 second sources. In part as a result of this test, the LBL design was found to be suitable as the baseline for a Common Long Pulse Source design for MFTF-B, TFTR, and Doublet Upgrade

  14. Department of Energy review of the National Spallation Neutron Source Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    A Department of Energy (DOE) review of the Conceptual Design Report (CDR) for the National Spallation Neutron Source (NSNS) was conducted. The NSNS will be a new high-power spallation neutron source; initially, it will operate at 1 megawatt (MW), but is designed to be upgradeable to significantly higher power, at lower cost, when accelerator and target technologies are developed for higher power. The 53-member Review Committee examined the projected cost, schedule, technical scope, and management structure described in the CDR. For each of the major components of the NSNS, the Committee determined that the project team had produced credible designs that can be expected to work well. What remains to be done is to integrate the design of these components. With the exception of the liquid mercury target, the NSNS Project will rely heavily on proven technologies and, thus, will face a relatively low risk to successful project completion. The Total Project Cost (TPC) presented to the Committee in the CDR was $1.266 billion in as-spent dollars. In general, the Committee felt that the laboratory consortium had presented a credible estimate for each of the major components but that value engineering might produce some savings. The construction schedule presented to the Committee covered six years beginning in FY 1999. The Committee questioned whether all parts of the project could be completed according to this schedule. In particular, the linac and the conventional facilities appeared to have overly optimistic schedules. The NSNS project team was encouraged to reexamine these activities and to consider a more conservative seven-year schedule. Another concern of the Committee was the management structure. In summary, the Committee felt that this Conceptual Design Report was a very credible proposal, and that there is a high probability for successful completion of this major project within the proposed budget, although the six-year proposed schedule may be optimistic.

  15. Department of Energy review of the National Spallation Neutron Source Project

    International Nuclear Information System (INIS)

    1997-06-01

    A Department of Energy (DOE) review of the Conceptual Design Report (CDR) for the National Spallation Neutron Source (NSNS) was conducted. The NSNS will be a new high-power spallation neutron source; initially, it will operate at 1 megawatt (MW), but is designed to be upgradeable to significantly higher power, at lower cost, when accelerator and target technologies are developed for higher power. The 53-member Review Committee examined the projected cost, schedule, technical scope, and management structure described in the CDR. For each of the major components of the NSNS, the Committee determined that the project team had produced credible designs that can be expected to work well. What remains to be done is to integrate the design of these components. With the exception of the liquid mercury target, the NSNS Project will rely heavily on proven technologies and, thus, will face a relatively low risk to successful project completion. The Total Project Cost (TPC) presented to the Committee in the CDR was $1.266 billion in as-spent dollars. In general, the Committee felt that the laboratory consortium had presented a credible estimate for each of the major components but that value engineering might produce some savings. The construction schedule presented to the Committee covered six years beginning in FY 1999. The Committee questioned whether all parts of the project could be completed according to this schedule. In particular, the linac and the conventional facilities appeared to have overly optimistic schedules. The NSNS project team was encouraged to reexamine these activities and to consider a more conservative seven-year schedule. Another concern of the Committee was the management structure. In summary, the Committee felt that this Conceptual Design Report was a very credible proposal, and that there is a high probability for successful completion of this major project within the proposed budget, although the six-year proposed schedule may be optimistic

  16. Polarized source upgrading

    International Nuclear Information System (INIS)

    Clegg, T.B.; Rummel, R.L.; Carter, E.P.; Westerfeldt, C.R.; Lovette, A.W.; Edwards, S.E.

    1985-01-01

    The decision was made this past year to move the Lamb-shift polarized ion source which was first installed in the laboratory in 1970. The motivation was the need to improve the flexibility of spin-axis orientation by installing the ion source with a new Wien-filter spin precessor which is capable of rotating physically about the beam axis. The move of the polarized source was accomplished in approximately two months, with the accelerator being turned off for experiments during approximately four weeks of this time. The occasion of the move provided the opportunity to rewire completely the entire polarized ion source frame and to rebuild approximately half of the electronic chassis on the source. The result is an ion source which is now logically wired and carefully documented. Beams obtained from the source are much more stable than those previously available

  17. Computer codes used during upgrading activities at MINT TRIGA reactor

    International Nuclear Information System (INIS)

    Mohammad Suhaimi Kassim; Adnan Bokhari; Mohd Idris Taib

    1999-01-01

    MINT TRIGA Reactor is a 1-MW swimming pool nuclear research reactor commissioned in 1982. In 1993, a project was initiated to upgrade the thermal power to 2 MW. The IAEA assistance was sought to assist the various activities relevant to an upgrading exercise. For neutronics calculations, the IAEA has provided expert assistance to introduce the WIMS code, TRIGAP, and EXTERMINATOR2. For thermal-hydraulics calculations, PARET and RELAP5 were introduced. Shielding codes include ANISN and MERCURE. However, in the middle of 1997, MINT has decided to change the scope of the project to safety upgrading of the MINT Reactor. This paper describes some of the activities carried out during the upgrading process. (author)

  18. Prototype application for the control and debugging of CMS upgrade projects

    CERN Document Server

    Mills-Howell, Dominic

    2016-01-01

    Following the high-luminosity upgrades of the LHC, many subsystems of the CMS experiment require upgrading and others are using the LHC shutdowns as an opportunity to improve performance. The upgrades, themselves, have served to highlight the exigency to attack problems that were previously unaddressed. One such problem is the need for a tool that allows the users to easily monitor, debug, and test custom hardware. Such a tool could be abstracted to work, in theory, with various hardware devices. In addition to having the added benefit of being able to support future hardware, and maintaining parallel operations with the remaining control software.

  19. SLHC, the high-luminosity upgrade (public event)

    CERN Multimedia

    CERN. Geneva

    2009-01-01

    In the morning of February 26th a public event is organised in CERN's main auditorium with the aim of informing the particle physics community about the current status of preparation work for the future LHC luminosity upgrade (Phase 1 and Phase 2). The presentations will provide an overview of the various accelerator sub-projects, the physics potential and the experiment upgrade plans. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the SLHC project. Informing the public about the overall status of SLHC is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  20. Successful Completion of the Top-off Upgrade of the Advanced Light Source

    International Nuclear Information System (INIS)

    Steier, C.; Bailey, B.; Baptiste, K.; Barry, W.; Biocca, A.; Byrne, W.; Casey, P.; Chin, M.; Donahue, R.; Duarte, R.; Fahmie, M.; Gath, B.; Jacobson, S.; Julian, J.; Jung, J.Y.; Kritscher, M.; Kwiatkowski, S.; Marks, S.; McKean, P.; Mueller, R.; Nishimura, H.; ONeill, J.; Portmann, G.; Prestemon, S.; Robin, D.; Rossi, S.; Sannibale, F.; Scarvie, T.; Schlueter, R.; Shuman, D.; Smith-Baumann, A.; Stover, G.; Timossi, C.; Wan, W.; Warwick, T.; Wells, R.; Weber, J.; Williams, E.

    2010-01-01

    An upgrade of the Advanced Light Source to enable top-off operation has been completed during the last four years. The final work centered around radiation safety aspects, culminating in a systematic proof that top-off operation is equally safe as decaying beam operation. Commissioning and transition to full user operations happened in late 2008 and early 2009. Top-off operation at the ALS provides a very large increase in time-averaged brightness (by about a factor of 10) as well as improvements in beam stability. The following sections provide an overview of the radiation safety rationale, commissioning results, as well as experience in user operations.

  1. High Intensity High Charge State ECR Ion Sources

    CERN Document Server

    Leitner, Daniela

    2005-01-01

    The next-generation heavy ion beam accelerators such as the proposed Rare Isotope Accelerator (RIA), the Radioactive Ion Beam Factory at RIKEN, the GSI upgrade project, the LHC-upgrade, and IMP in Lanzhou require a great variety of high charge state ion beams with a magnitude higher beam intensity than currently achievable. High performance Electron Cyclotron Resonance (ECR) ion sources can provide the flexibility since they can routinely produce beams from hydrogen to uranium. Over the last three decades, ECR ion sources have continued improving the available ion beam intensities by increasing the magnetic fields and ECR heating frequencies to enhance the confinement and the plasma density. With advances in superconducting magnet technology, a new generation of high field superconducting sources is now emerging, designed to meet the requirements of these next generation accelerator projects. The talk will briefly review the field of high performance ECR ion sources and the latest developments for high intens...

  2. Operating experience of upgraded radio frequency source at 76 MHz coupled to heavy ion RFQ

    International Nuclear Information System (INIS)

    Pande, Manjiri; Shiju, A.; Patel, N.R.; Shrotriya, S.D.; Bhagwat, P.V.

    2015-01-01

    A heavy ion radio frequency quadrupole (RFQ) accelerator has been developed at BARC (BARC). A RF source which was designed and developed at 76 MHz earlier, has been upgraded and coupled to heavy ion RFQ successfully. The DC bias supplies of this source have been replaced with new supplies having high efficiency and well filteration against RF interference (RFI). The driver of main power amplifier has been replaced with indigenously designed and developed unit. The earlier introduced microcontroller based interlock experienced RF noise issues. So, this circuit has been modified with the new circuit. With these modifications, the performance of the RF source was improved. Additionally, a separate low power RF source of around 100 + Watt was designed, developed and integrated with RFQ for its RF conditioning. This paper describes the details of up gradation of technologies implemented and coupling experience of this RF source with heavy ion RFQ. (author)

  3. A human reliability assessment screening method for the NRU upgrade project

    International Nuclear Information System (INIS)

    Bremner, F.M.; Alsop, C.J.

    1997-01-01

    The National Research Universal (NRU) reactor is a 130MW, low pressure, heavy water cooled and moderated research reactor. The reactor is used for research, both in support of Canada's CANDU development program, and for a wide variety of other research applications. In addition, NRU plays an important part in the production of medical isotopes, e.g., generating 80% of worldwide supplies of Molybdenum-99. NRU is owned and operated by Atomic Energy of Canada Ltd. (AECL), and is currently undergoing upgrading as part of AECL's continuing commitment to operate their facilities in a safe manner. As part of these upgrades both deterministic and probabilistic safety assessments are being carried out. It was recognized that the assignment of Human Error Probabilities (HEPs) is an important part of the Probabilistic Safety Assessment (PSA) studies, particularly for a facility whose design predates modern ergonomic practices, and which will undergo a series of backfitted modifications whilst continuing to operate. A simple Human Reliability Assessment (HRA) screening method, looking at both pre- and post-accident errors, was used in the initial safety studies. However, following review of this method within AECL and externally by the regulator, it was judged that benefits could be gained for future error reduction by including additional features, as later described in this document. The HRA development project consisted of several stages; needs analysis, literature review, development of method (including testing and evaluation), and implementation. This paper discusses each of these stages in further detail. (author)

  4. Experience in the upgrading of radioactive waste disposal facility 'Ekores'

    International Nuclear Information System (INIS)

    Rozdyalovskaya, L.

    2000-01-01

    The national Belarus radioactive disposal facility 'Ekores' is designed for waste from nuclear applications in industry, medicine and research. Currently 12-20 tons of waste and over 6000 various types spent sources annually come to the 'Ekores'. Total activity in the vaults is evaluated as 352.8 TBq. Approximately 150 000 spent sources disposed of in the vaults and wells have total activity about 1327 TBq. In 1997 the Government initiated a project for the facility reconstruction in order to upgrade radiological safety of the site by creating adequate safety conditions for managing and storage of the waste. The reconstruction project developed by Belarus specialists has been reviewed by IAEA experts. This covers modernising technologies for new coming waste and also that the waste currently disposed in the pits is retrieved, sorted and treated in the same way as the new coming waste

  5. Argonne's atlas control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.; Quock, D.; Chapin, B.; Figueroa, J.

    1999-01-01

    The ATLAS facility (Argonne Tandem-Linac Accelerator System) is located at the Argonne National Laboratory. The facility is a tool used in nuclear and atomic physics research, which focuses primarily on heavy-ion physics. The accelerator as well as its control system are evolutionary in nature, and consequently, continue to advance. In 1998 the most recent project to upgrade the ATLAS control system was completed. This paper briefly reviews the upgrade, and summarizes the configuration and features of the resulting control system

  6. X-ray optics simulation and beamline design for the APS upgrade

    Science.gov (United States)

    Shi, Xianbo; Reininger, Ruben; Harder, Ross; Haeffner, Dean

    2017-08-01

    The upgrade of the Advanced Photon Source (APS) to a Multi-Bend Achromat (MBA) will increase the brightness of the APS by between two and three orders of magnitude. The APS upgrade (APS-U) project includes a list of feature beamlines that will take full advantage of the new machine. Many of the existing beamlines will be also upgraded to profit from this significant machine enhancement. Optics simulations are essential in the design and optimization of these new and existing beamlines. In this contribution, the simulation tools used and developed at APS, ranging from analytical to numerical methods, are summarized. Three general optical layouts are compared in terms of their coherence control and focusing capabilities. The concept of zoom optics, where two sets of focusing elements (e.g., CRLs and KB mirrors) are used to provide variable beam sizes at a fixed focal plane, is optimized analytically. The effects of figure errors on the vertical spot size and on the local coherence along the vertical direction of the optimized design are investigated.

  7. Expected performance of the upgrade ATLAS experiment for HL-LHC

    CERN Document Server

    Liu, Peilian; The ATLAS collaboration

    2018-01-01

    The Large Hadron Collider (LHC) has been successfully delivering proton-proton collision data at the unprecedented center of mass energy of 13 TeV. An upgrade is planned to increase the instantaneous luminosity delivered by the LHC in what is called the HL-LHC, aiming to deliver a total of up 3000/fb to 4000/fb of data per experiment. To cope with the expected data-taking conditions ATLAS is planning major upgrades of the detector. It is now a critical time for these upgrade projects and during the last year and a half, six Technical Design Reports (TDR) were produced by the ATLAS Collaboration. In these TDRs the physics motivation and benefits of such upgrades are discussed together with details on the upgrade project itself. In this contribution we review the expected performance of the upgraded ATLAS detector and the expected reach for physics measurements as well as the discovery potential for new physics that is expected by the end of the HL-LHC data-taking. The performance of object reconstruction under...

  8. Preliminary studies for the upgrading of the ININ TRIGA MARK III reactor

    International Nuclear Information System (INIS)

    Aguilar, J.V.

    1984-01-01

    An increase on the demand of services has led to the -consideration of reactor upgrading, for which a project has been proposed. This project includes the modification of the reactor core, using FLIP type (Erbium loaded, 70% U-235 enriched) fuel elements and the upgrading of the control - console which implies a careful analysis of the Safety -considerations involved in the system modification. In this paper, a brief description is given of: The modifications intended; Pre-operational tests for the system components to be modified; The safety report needed for the licensing of the upgraded reactor; The project management and evaluation

  9. Status of the Upgrade of the CERN PS Booster

    CERN Document Server

    Hanke, K; Angoletta, M; Bartmann, W; Bartolome, S; Benedetto, E; Bertone, C; Blas, A; Bonnal, P; Borburgh, J; Bozzini, D; Butterworth, A; Carli, C; Carlier, E; Cole, J; Dahlen, P; Delonca, M; Dobers, T; Findlay, A; Froeschl, R; Hansen, J; Hay, D; Jensen, S; Lacroix, J; Le Roux, P; Lopez Hernandez, L; Maglioni, C; Masi, A; Mason, G; Mathot, S; Mikulec, B; Muttoni, Y; Newborough, A; Nisbet, D; Olek, S; Paoluzzi, M; Perillo-Marcone, A; Pittet, S; Puccio, B; Raginel, V; Riffaud, B; Ruehl, I; Sarrió Martínez, A; Tan, J; Todd, B; Venturi, V; Weterings, W

    2013-01-01

    The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H- ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program.

  10. Plans for the upgrade of the LHC injectors

    CERN Document Server

    Garoby, R; Goddard, B; Hanke, K; Meddahi, M; Vretenar, M

    2011-01-01

    The LHC injectors upgrade (LIU) project has been launched at the end of 2010 to prepare the CERN accelerator complex for reliably providing beam with the challenging characteristics required by the high luminosity LHC until at least 2030. Based on the work already started on Linac4, PS Booster, PS and SPS, the LIU project coordinates studies and implementation, and interfaces with the high luminosity LHC (HL-LHC) project which looks after the upgrade of the LHC itself, expected by the end of the present decade. The anticipated beam characteristics are described, as well as the status of the studies and the solutions envisaged for improving the injector performances.

  11. ATLAS Upgrade Plans

    CERN Document Server

    Hopkins, W; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000/fb by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new...

  12. Safety upgrades to the NRU research reactor

    International Nuclear Information System (INIS)

    DeAbreu, B.; Mark, J.M.; Mutterback, E.J.

    1998-01-01

    The NRU (National Research Universal) Reactor is a 135 MW thermal research facility located at Chalk River Laboratories, and is owned and operated by Atomic Energy of Canada Limited. One of the largest and most versatile research reactors in the world, it serves as the R and D workhorse for Canada's CANDU business while at the same time filling the role as one of the world's major producers of medical radioisotopes. AECL plans to extend operation of the NRU reactor to approximately the year 2005 when a new replacement, the Irradiation Research Facility (IRF) will be available. To achieve this, AECL has undertaken a program of safety reassessment and upgrades to enhance the level of safety consistent with modem requirements. An engineering assessment/inspection of critical systems, equipment and components was completed and seven major safety upgrades are being designed and installed. These upgrades will significantly reduce the reactor's vulnerability to common mode failures and external hazards, with particular emphasis on seismic protection. The scheduled completion date for the project is 1999 December at a cost approximately twice the annual operating cost. All work on the NRU upgrade project is planned and integrated into the regular operating cycles of the reactor; no major outages are anticipated. This paper describes the safety upgrades and discusses the technical and managerial challenges involved in extending the operating life of the NRU reactor. (author)

  13. TCV divertor upgrade for alternative magnetic configurations

    Directory of Open Access Journals (Sweden)

    H. Reimerdes

    2017-08-01

    Full Text Available The Swiss Plasma Center (SPC is planning a divertor upgrade for the TCV tokamak. The upgrade aims at extending the research of conventional and alternative divertor configurations to operational scenarios and divertor regimes of greater relevance for a fusion reactor. The main elements of the upgrade are the installation of an in-vessel structure to form a divertor chamber of variable closure and enhanced diagnostic capabilities, an increase of the pumping capability of the divertor chamber and the addition of new divertor poloidal field coils. The project follows a staged approach and is carried out in parallel with an upgrade of the TCV heating system. First calculations using the EMC3-Eirene code indicate that realistic baffles together with the planned heating upgrade will allow for a significantly higher compression of neutral particles in the divertor, which is a prerequisite to test the power dissipation potential of various divertor configurations.

  14. Processing options for bitumen upgrading

    International Nuclear Information System (INIS)

    Harji, A.N.; Koppel, P.E.; Mazurek, W.L.; Meysami, P.

    2003-01-01

    It is estimated that 178 billion barrels of oil can be recovered from Alberta's vast heavy oil reserves. The challenge lies in the logistics of recovering, upgrading and transporting the oil to market. The Canadian Energy Research Institute conducted a recent study to determine market potential by 2007 for diluted bitumen and synthetic crude oil produced from upgraded bitumen. The viability for a wide range of bitumen feedstocks was assessed along with the sensitivity of refinery demand to their prices. The 3 major markets for western Canadian bitumen include PADD 2 in the United States, western Canada, and Ontario. Bitumen is too viscous to transport by pipeline and cannot be processed by most of the existing refineries. Therefore, in order to develop a mass market for the product, bitumen must undergo the energy intensive upgrading process at existing refineries. The factors impacting which method of upgrading is most suitable were discussed with particular attention to the impact that Canada's ratification of the Kyoto Protocol may have on Alberta's bitumen resource in terms of costs of complying with greenhouse gas reduction initiatives. The authors emphasized that it is crucial to customize an upgrading project to meet site and market specific factors. 8 refs., 3 tabs., 3 figs

  15. The ALICE TPC Upgrad

    Science.gov (United States)

    Castro, Andrew; Alice-Usa Collaboration; Alice-Tpc Collaboration

    2017-09-01

    The Time Projection Chamber (TPC) currently used for ALICE (A Large Ion Collider Experiment at CERN) is a gaseous tracking detector used to study both proton-proton and heavy-ion collisions at the Large Hadron Collider (LHC) In order to accommodate the higher luminosit collisions planned for the LHC Run-3 starting in 2021, the ALICE-TPC will undergo a major upgrade during the next LHC shut down. The TPC is limited to a read out of 1000 Hz in minimum bias events due to the intrinsic dead time associated with back ion flow in the multi wire proportional chambers (MWPC) in the TPC. The TPC upgrade will handle the increase in event readout to 50 kHz for heavy ion minimum bias triggered events expected with the Run-3 luminosity by switching the MWPCs to a stack of four Gaseous Electron Multiplier (GEM) foils. The GEM layers will combine different hole pitches to reduce the dead time while maintaining the current spatial and energy resolution of the existing TPC. Undertaking the upgrade of the TPC represents a massive endeavor in terms of design, production, construction, quality assurance, and installation, thus the upgrade is coordinated over a number of institutes worldwide. The talk will go over the physics motivation for the upgrade, the ALICE-USA contribution to the construction of Inner Read Out Chambers IROCs, and QA from the first chambers built in the U.S

  16. Upgrade of the ultracold neutron source at the pulsed reactor TRIGA Mainz

    Energy Technology Data Exchange (ETDEWEB)

    Kahlenberg, J.; Ross, K.U.; Beck, M.; Heil, W.; Karch, J.; Kories, F.; Kretschmer, M. [Johannes Gutenberg University, Institute of Physics, Mainz (Germany); Ries, D. [Johannes Gutenberg University, Institute of Nuclear Chemistry, Mainz (Germany); Paul Scherrer Institute (PSI), Laboratory for Particle Physics, Villigen (Switzerland); ETH Zuerich, Institute for Particle Physics, Zuerich (Switzerland); Siemensen, C.; Geppert, C.; Karpuk, S.; Reich, T.; Sobolev, Y.; Trautmann, N. [Johannes Gutenberg University, Institute of Nuclear Chemistry, Mainz (Germany); Hild, N. [Paul Scherrer Institute (PSI), Laboratory for Particle Physics, Villigen (Switzerland); ETH Zuerich, Institute for Particle Physics, Zuerich (Switzerland); Lauss, B. [Paul Scherrer Institute (PSI), Laboratory for Particle Physics, Villigen (Switzerland)

    2017-11-15

    The performance of the upgraded solid deuterium ultracold neutron source at the pulsed reactor TRIGA Mainz is described. The current configuration stage comprises the installation of a He liquefier to run UCN experiments over long-term periods, the use of stainless steel neutron guides with improved transmission as well as sputter-coated non-magnetic {sup 58}NiMo alloy at the inside walls of the thermal bridge and the converter cup. The UCN yield was measured in a ''standard'' UCN storage bottle (stainless steel) with a volume of 32 litres outside the biological shield at the experimental area yielding UCN densities of 8.5/cm{sup 3}; an increase by a factor of 3.5 compared to the former setup. The measured UCN storage curve is in good agreement with the predictions from a Monte Carlo simulation developed to model the source. The growth and formation of the solid deuterium converter during freeze-out are affected by the ortho/para ratio of the H{sub 2} premoderator. (orig.)

  17. Ukraine-Japanese-Swedish project: Upgrading of perimeter protection system at Kharkov Institute of Physics and Technology (KIPT)

    International Nuclear Information System (INIS)

    Mikahaylov, V.; Lapshin, V.; Ek, P.; Flyghed, L.; Nilsson, A.; Ooka, N.; Shimizu, K.; Tanuma, K.

    2001-01-01

    project a lot of equipment manufactured in Sweden, Japan, and partly in the USA, was procured by funding by Japan and delivered to KIPT. Completion of the work was scheduled to take place in about one year. However, despite the selfless work of the KIPT personnel and other exports, the upgrading of the perimeter initiated in October 1998 was completed, due to difficult weather conditions, custom problems etc., at the end of 2000. The project included installation of more than 6 kilometers of the standard external fencing along the perimeter of protected area of the nuclear facility, microwave and other for intrusion detection, system for cable TV alarm assessment and control (CCTV), diesel-generation to serve as an emergency power supply source for the entire physical protection system. The center alarm station (CAS) integrated the control equipment for the perimeter protection system provided by the Sweden and Japan as well as for the storage delivered by the USA. The CAS was tested and came into operation as an integral part of the entire physical protection system at KIPT in December 2000. The successful completion of the project has lead to a significant improvement of the protection level at KIPT. Thereby it has significantly reduced the possibility for unauthorised withdrawal of the special fissionable material that is available at KIPT in quantities and forms attractive for nuclear terrorists and saboteurs. The commissioning of a new modem physical protection system specially designed for KIPT point at some future problems, in particular, as regards training of operation and engineering personnel, providing service and maintenance, and providing necessary spare parts. The Japan Technical Secretariat and the Swedish Nuclear Power Inspectorate have undertaken to provide necessary support for service and maintenance, including spare parts, until the end of 2002. However, for a longer period of time the KIPT management needs to focus on this issue. (author)

  18. RF upgrade program in LHC injectors and LHC machine

    International Nuclear Information System (INIS)

    Jensen, E.

    2012-01-01

    The main themes of the RF upgrade program are: the Linac4 project, the LLRF-upgrade and the study of a tuning-free wide-band system for PSB, the upgrade of the SPS 800 MHz amplifiers and beam controls and the upgrade of the transverse dampers of the LHC. Whilst LHC Splice Consolidation is certainly the top priority for LS1, some necessary RF consolidation and upgrade is necessary to assure the LHC performance for the next 3- year run period. This includes: 1) necessary maintenance and consolidation work that could not fit the shorter technical stops during the last years, 2) the upgrade of the SPS 200 MHz system from presently 4 to 6 cavities and possibly 3) the replacement of one LHC cavity module. On the longer term, the LHC luminosity upgrade requires crab cavities, for which some preparatory work in SPS Coldex must be scheduled during LS1. (author)

  19. Control system upgrades support better plant economics

    International Nuclear Information System (INIS)

    De Grosbois, J.; Hepburn, A.; Storey, H.; Basso, R.; Kumar, V.

    2002-01-01

    This paper (second in the series, see [1]) provides insight on how nuclear plants can achieve better efficiencies and reduced operations and maintenance (O and M) costs through focused control system upgrades. An understanding of this relationship is necessary to properly assess the economics of plant refurbishment decisions. Traditional economic feasibility assessment methods such as benefit cost analysis (BCA), internal rate of return (IRR), benefit cost ratios (B/C), or payback analysis are often performed without full consideration of project alternatives, quantified benefits, and life cycle costing. Consideration must be given to not only capital cost and project risk, but also to the potential economic benefits of new technology and added functionality offered by plant upgrades. Recent experience shows that if upgrades are focused on priority objectives, and are effectively implemented, they can deliver significant payback over the life of the plant, sometimes orders of magnitude higher than their initial capital cost. The following discussion explores some of the key issues and rationale behind upgrade decisions and their impact on improved plant efficiency and reduced O and M costs. A subsequent paper will explain how the justification for these improvements can be captured in an economic analysis and feasibility study to support strategic decision-making in a plant refurbishment context. (author)

  20. LHCb DAQ network upgrade tests

    CERN Document Server

    Pisani, Flavio

    2013-01-01

    My project concerned the evaluation of new technologies for the DAQ network upgrade of LHCb. The first part consisted in developing and Open Flow-based Clos network. This new technology is very interesting and powerful but, as shown by the results, it still needs further improvements. The second part consisted in testing and benchmarking 40GbE network equipment: Mellanox MT27500, Chelsio T580 and Huawei Cloud Engine 12804. An event-building simulation is currently been performed in order to check the feasibility of the DAQ network upgrade in LS2. The first results are promising.

  1. Injection Protection Upgrade for the HL-LHC

    CERN Document Server

    AUTHOR|(CDS)2067108; Biancacci, Nicolo; Bracco, Chiara; Frasciello, Oscar; Gentini, Luca; Goddard, Brennan; Lechner, Anton; Maciariello, Fausto; Perillo Marcone, Antonio; Salvant, Benoit; Shetty, Nikhil Vittal; Steele, Genevieve; Velotti, Francesco; Zobov, Mikhail

    2015-01-01

    The injector complex of the LHC is undergoing important changes in the light of the LIU project to provide brighter beams to the LHC. For this reason and as part of the High Luminosity LHC project the injection protection system of the LHC will be upgraded in the Long Shutdown 2 (2018 - 2019) to be able to protect downstream elements against injection failures with the high brightness, high intensity HL-LHC beams. The upgraded LHC injection protection system will consist of a segmented injection protection absorber TDIS, and auxiliary collimators and masks. The layout modifications are described, and the machine element protection and absorber jaw robustness studies are presented for the new systems.

  2. Hydrogen alternatives for a regional upgrader

    International Nuclear Information System (INIS)

    Bailey, R.T.; Padamsey, R.

    1991-01-01

    For a proposed regional upgrader in Alberta, hydrogen will be needed to upgrade the bitumen and heavy oil to be processed by that facility. The upgrader will rely on high conversion hydrocracking which consumes 3.4 wt % hydrogen to produce a 106% volume yield of high quality synthetic crude. The costs of producing hydrogen via steam reforming of methane, partial oxidation of coal or upgrading residues, and electrolysis are compared, showing that steam reforming is the cheapest. However, an even cheaper source of hydrogen is available in the Edmonton and Fort Saskatchewan area as byproducts from petrochemical plants. An economic analysis is presented of a proposed scheme to capture, purify, compress, and transfer hydrogen from one or two such plants to a nearby regional upgrader. The two plants could supply a total of 126.6 million ft 3 /d of hydrogen at a total installed capital cost of about half of that of a steam reforming plant of equivalent size. When operating costs are added (including the cost of replacing the hydrogen, currently used as fuel at the two plants, with natural gas), the total cost of hydrogen is substantially less than the costs for a hydrogen plant within the upgrader. 3 refs., 5 figs., 4 tabs

  3. Status of the University of Missouri-Columbia Research Reactor upgrade

    International Nuclear Information System (INIS)

    McKibben, J.C.; Edwards, C.B. Jr.; Meyer, W.A. Jr.; Kim, S.S.

    1990-01-01

    The University of Missouri-Columbia (MU) Research Reactor Facility staff is in the process of upgrading the operational and research capabilities of the reactor and associated facilities. The upgrades include an extended life aluminide fuel element, a power increase, improved instrumentation and control equipment, a cold neutron source, a building addition, and improved research instrumentation and equipment. These upgrades will greatly enhance the capabilities of the facility and the research programs. This paper discusses the parts of the upgrade and current status of implementation. (author)

  4. Status of the University of Missouri-Columbia Research Reactor upgrade

    Energy Technology Data Exchange (ETDEWEB)

    McKibben, J C; Edwards, Jr, C B; Meyer, Jr, W A [MU Research Reactor, Columbia, MO (United States); Kim, S S [Idaho Nuclear Engineering Laboratory, Idaho Falls, ID (United States)

    1990-05-01

    The University of Missouri-Columbia (MU) Research Reactor Facility staff is in the process of upgrading the operational and research capabilities of the reactor and associated facilities. The upgrades include an extended life aluminide fuel element, a power increase, improved instrumentation and control equipment, a cold neutron source, a building addition, and improved research instrumentation and equipment. These upgrades will greatly enhance the capabilities of the facility and the research programs. This paper discusses the parts of the upgrade and current status of implementation. (author)

  5. Equipment and performance upgrade of compact nuclear simulator

    International Nuclear Information System (INIS)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators

  6. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators.

  7. Open Source Vulnerability Database Project

    Directory of Open Access Journals (Sweden)

    Jake Kouns

    2008-06-01

    Full Text Available This article introduces the Open Source Vulnerability Database (OSVDB project which manages a global collection of computer security vulnerabilities, available for free use by the information security community. This collection contains information on known security weaknesses in operating systems, software products, protocols, hardware devices, and other infrastructure elements of information technology. The OSVDB project is intended to be the centralized global open source vulnerability collection on the Internet.

  8. IPNS upgrade: A feasibility study

    International Nuclear Information System (INIS)

    1995-04-01

    Many of Argonne National Laboratory's (ANL's) scientific staff members were very active in R ampersand D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R ampersand D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL's Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately

  9. IPNS upgrade: A feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

  10. The ATLAS SCT: Commissioning experience and SLHC upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Mitrevski, J. [Santa Cruz Institute for Particle Physics, University of California, Santa Cruz, CA 95064 (United States)], E-mail: Jovan.Mitrevski@cern.ch

    2009-06-01

    The ATLAS Semiconductor Tracker (SCT) has been installed, and fully connected to electrical, optical and cooling services. Commissioning has been performed both with calibration data and cosmic ray events. The cosmics were used to align the detector, measure the hit efficiency and set the timing. The SCT is now ready to take data when the LHC turns on this autumn. At the same time, it is clear that the present ATLAS tracker will need to be renewed for projected luminosity upgrade of the LHC, the SLHC. This is mainly driven by occupancy and radiation hardness issues. The new tracker will likely be entirely made of silicon, with the space of the present SCT largely taken up by detectors with much shorter strips. Several large-scale R and D projects on the sensors and module concepts for this upgrade are running, including sensor and module prototyping. We will report upon the commissioning experience from the SCT, use it to extract valuable lessons for future silicon tracker projects, and give an up-to-date overview of the status and results of the R and D efforts for the ATLAS tracker upgrade.

  11. The ATLAS SCT: Commissioning experience and SLHC upgrade

    International Nuclear Information System (INIS)

    Mitrevski, J.

    2009-01-01

    The ATLAS Semiconductor Tracker (SCT) has been installed, and fully connected to electrical, optical and cooling services. Commissioning has been performed both with calibration data and cosmic ray events. The cosmics were used to align the detector, measure the hit efficiency and set the timing. The SCT is now ready to take data when the LHC turns on this autumn. At the same time, it is clear that the present ATLAS tracker will need to be renewed for projected luminosity upgrade of the LHC, the SLHC. This is mainly driven by occupancy and radiation hardness issues. The new tracker will likely be entirely made of silicon, with the space of the present SCT largely taken up by detectors with much shorter strips. Several large-scale R and D projects on the sensors and module concepts for this upgrade are running, including sensor and module prototyping. We will report upon the commissioning experience from the SCT, use it to extract valuable lessons for future silicon tracker projects, and give an up-to-date overview of the status and results of the R and D efforts for the ATLAS tracker upgrade.

  12. Qinshan 300Mwe NPP full scope simulator upgrade

    International Nuclear Information System (INIS)

    Qi Kelin; Li Qing; Liu Wei, Lai Shengyuan

    2006-01-01

    On April 28,2004, RINPO was awarded the project for Qinshan 300Mwe NPP full scope simulator upgrade, the SAT (site acceptance test) was completed on June 30 2005 and the simulator put into operator training again. Scope of upgrade includes: computer system (DGI server and workstations) all replaced by microcomputers; G2 I/O controllers all replaced by RTP EIOBC; Unix-based simulation support environment replaced by RINPO's PC-based simulation environment RINSIMTM, Instructor software replaced by RINPO's PC-based instructor software with function and diagram redesigned; DEH, Feed-water control and some other digital control systems redeveloped to follow NPP modifications; desk-top simulator with soft panel control room developed as byproduct; most of the models not changed but it is planned the reactor core and PPC model will be upgraded in near future. SAT of upgrade demonstrates that the performance of the simulator much improved after the upgrade. (author)

  13. Performance of the upgraded ultracold neutron source at Los Alamos National Laboratory and its implication for a possible neutron electric dipole moment experiment

    Science.gov (United States)

    Ito, T. M.; Adamek, E. R.; Callahan, N. B.; Choi, J. H.; Clayton, S. M.; Cude-Woods, C.; Currie, S.; Ding, X.; Fellers, D. E.; Geltenbort, P.; Lamoreaux, S. K.; Liu, C.-Y.; MacDonald, S.; Makela, M.; Morris, C. L.; Pattie, R. W.; Ramsey, J. C.; Salvat, D. J.; Saunders, A.; Sharapov, E. I.; Sjue, S.; Sprow, A. P.; Tang, Z.; Weaver, H. L.; Wei, W.; Young, A. R.

    2018-01-01

    The ultracold neutron (UCN) source at Los Alamos National Laboratory (LANL), which uses solid deuterium as the UCN converter and is driven by accelerator spallation neutrons, has been successfully operated for over 10 years, providing UCN to various experiments, as the first production UCN source based on the superthermal process. It has recently undergone a major upgrade. This paper describes the design and performance of the upgraded LANL UCN source. Measurements of the cold neutron spectrum and UCN density are presented and compared to Monte Carlo predictions. The source is shown to perform as modeled. The UCN density measured at the exit of the biological shield was 184 (32 ) UCN /cm3 , a fourfold increase from the highest previously reported. The polarized UCN density stored in an external chamber was measured to be 39 (7 ) UCN /cm3 , which is sufficient to perform an experiment to search for the nonzero neutron electric dipole moment with a one-standard-deviation sensitivity of σ (dn) =3 ×10-27e cm .

  14. Environmental upgrading of a landfill

    International Nuclear Information System (INIS)

    Agostinetto, V.; Vendrame, G.

    1999-01-01

    This article refers to an experimental study concerning the vegetative upgrading of a closed-down landfill (once used for industrial waste disposal). The aim was to check the possibility of reconstructing or aiding the natural growth of a vegetation in keeping with the surrounding area, in a tried environment such as that of landfills. The original idea contained in the approved project - which meant to generically upgrade the territory by planting species belonging to the grassy layer, shrubs and trees - has, with time, undergone some changes. On the basis of both the knowledge acquired during management and of a more accurate analysis of the territory, the experiment was preferred to aim at finding out which were the species, both continental and Mediterranean, able to gradually adjust to the surrounding landscape, leaving to natural selection the task to decide which species were more suitable to the upgrading of closed-down landfills, and which planting technique was more effective [it

  15. Scenarios for the LHC Upgrade

    CERN Document Server

    Scandale, Walter

    2008-01-01

    The projected lifetime of the LHC low-beta quadrupoles, the evolution of the statistical error halving time, and the physics potential all call for an LHC luminosity upgrade by the middle of the coming decade. In the framework of the CARE-HHH network three principal scenarios have been developed for increasing the LHC peak luminosity by more than a factor of 10, to values above 1035 cm−2s−1. All scenarios imply a rebuilding of the high-luminosity interaction regions (IRs) in combination with a consistent change of beam parameters. However, their respective features, bunch structures, IR layouts, merits and challenges, and luminosity variation with β∗ differ substantially. In all scenarios luminosity leveling during a store would be advantageous for the physics experiments. An injector upgrade must complement the upgrade measures in the LHC proper in order to provide the beam intensity and brightness needed as well as to reduce the LHC turnaround time for higher integrated luminosity.

  16. Hydrogen assisted biological biogas upgrading

    DEFF Research Database (Denmark)

    Bassani, Ilaria

    Wind and biomass are promoted worldwide as sustainable forms of energy. Anaerobic digestion of biomass produces biogas with ∼50−70% CH4 and 30−50% CO2. However, biogas with >90% CH4 content has higher heating value, can be injected into the natural gas grid or used as alternative to natural gas...... as vehicle fuel. Methods currently available for biogas upgrading mainly consists of physicochemical CO2 removal, requiring the use of chemical substances and energy input and, thus, increasing process costs. This PhD project proposes an alternative to existing biogas upgrading technologies, where H2......, produced by water electrolysis, using excess of electricity from wind mills, is coupled with the CO2 contained in the biogas to convert them to CH4. This process is defined as biological biogas upgrading and is carried out by hydrogenotrophic methanogenic archaea that couples CO2 with H2 to produce...

  17. Lower Emittance Lattice for the Advanced Photon Source Upgrade Using Reverse Bending Magnets

    Energy Technology Data Exchange (ETDEWEB)

    Borland, M.; Berenc, T.; Sun, Y.; Sajaev, V.

    2017-06-01

    The Advanced Photon Source (APS) is pursuing an upgrade to the storage ring to a hybrid seven-bend-achromat design [1]. The nominal design provides a natural emittance of 67 pm [2]. By adding reverse dipole fields to several quadrupoles [3, 4] we can reduce the natural emittance to 41 pm while simultaneously providing more optimal beta functions in the insertion devices and increasing the dispersion function at the chromaticity sextupole magnets. The improved emittance results from a combination of increased energy loss per turn and a change in the damping partition. At the same time, the nonlinear dynamics performance is very similar, thanks in part to increased dispersion in the sextupoles. This paper describes the properties, optimization, and performance of the new lattice.

  18. Reproduction of the Yucca Mountain Project TSPA-LA Uncertainty and Sensitivity Analyses and Preliminary Upgrade of Models

    Energy Technology Data Exchange (ETDEWEB)

    Hadgu, Teklu [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Nuclear Waste Disposal Research and Analysis; Appel, Gordon John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Nuclear Waste Disposal Research and Analysis

    2016-09-01

    Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014) and Hadgu et al. (2015). The TSPA computing hardware (CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of GoldSim with Versions 9.60.300, 10.5 and 11.1.6 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA-type analysis on the server cluster. The current tasks included verification of the TSPA-LA uncertainty and sensitivity analyses, and preliminary upgrade of the TSPA-LA from Version 9.60.300 to the latest version 11.1. All the TSPA-LA uncertainty and sensitivity analyses modeling cases were successfully tested and verified for the model reproducibility on the upgraded 2014 server cluster (CL2014). The uncertainty and sensitivity analyses used TSPA-LA modeling cases output generated in FY15 based on GoldSim Version 9.60.300 documented in Hadgu et al. (2015). The model upgrade task successfully converted the Nominal Modeling case to GoldSim Version 11.1. Upgrade of the remaining of the modeling cases and distributed processing tasks will continue. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

  19. Instrument hardware and software upgrades at IPNS

    International Nuclear Information System (INIS)

    Worlton, Thomas; Hammonds, John; Mikkelson, D.; Mikkelson, Ruth; Porter, Rodney; Tao, Julian; Chatterjee, Alok

    2006-01-01

    IPNS is in the process of upgrading their time-of-flight neutron scattering instruments with improved hardware and software. The hardware upgrades include replacing old VAX Qbus and Multibus-based data acquisition systems with new systems based on VXI and VME. Hardware upgrades also include expanded detector banks and new detector electronics. Old VAX Fortran-based data acquisition and analysis software is being replaced with new software as part of the ISAW project. ISAW is written in Java for ease of development and portability, and is now used routinely for data visualization, reduction, and analysis on all upgraded instruments. ISAW provides the ability to process and visualize the data from thousands of detector pixels, each having thousands of time channels. These operations can be done interactively through a familiar graphical user interface or automatically through simple scripts. Scripts and operators provided by end users are automatically included in the ISAW menu structure, along with those distributed with ISAW, when the application is started

  20. Future of the CMS Muon System Upgrades and Aging

    CERN Document Server

    Pilot, Justin Robert

    2016-01-01

    The CMS detector currently includes three different muon detector types drift tubes (DT) in the central region, cathode strip chambers (CSC) in the forward regions, and resistive plate chambers (RPC) in both the forward and central regions. Several upgrade projects are planned to maintain high data-taking efficiency with the planned running conditions for the high-luminosity upgrade of the LHC. These upgrades are designed to ensure detector longevity and increase redundancy, while mitigating rate increases and retaining sensitivity to phyics processes. This involves changes to electronics and infrastructure of existing detectors, and adding new detectors in the forward region of the CMS experiment. Plans for each of the muon subsystems are described here in the context of the Phase-II upgrade schedule of the CMS experiment.

  1. Positron Beam Characteristics at NEPOMUC Upgrade

    Science.gov (United States)

    Hugenschmidt, C.; Ceeh, H.; Gigl, T.; Lippert, F.; Piochacz, C.; Reiner, M.; Schreckenbach, K.; Vohburger, S.; Weber, J.; Zimnik, S.

    2014-04-01

    In 2012, the new neutron induced positron source NEPOMUC upgrade was put into operation at FRMII. Major changes have been made to the source which consists of a neutron-γ-converter out of Cd and a Pt foil structure for electron positron pair production and positron moderation. The new design leads to an improvement of both intensity and brightness of the mono-energetic positron beam. In addition, the application of highly enriched 113Cd as neutron-γ-converter extends the lifetime of the positron source to 25 years. A new switching and remoderation device has been installed in order to allow toggling from the high-intensity primary beam to a brightness enhanced remoderated positron beam. At present, an intensity of more than 109 moderated positrons per second is achieved at NEPOMUC upgrade. The main characteristics are presented which comprise positron yield and beam profile of both the primary and the remoderated positron beam.

  2. Open Source Approach to Project Management Tools

    Directory of Open Access Journals (Sweden)

    Romeo MARGEA

    2011-01-01

    Full Text Available Managing large projects involving different groups of people and complex tasks can be challenging. The solution is to use Project management software, which allows a more efficient management of projects. However, famous project management systems can be costly and may require expensive custom servers. Even if free software is not as complex as Microsoft Project, is noteworthy to think that not all projects need all the features, amenities and power of such systems. There are free and open source software alternatives that meet the needs of most projects, and that allow Web access based on different platforms and locations. A starting stage in adopting an OSS in-house is finding and identifying existing open source solution. In this paper we present an overview of Open Source Project Management Software (OSPMS based on articles, reviews, books and developers’ web sites, about those that seem to be the most popular software in this category.

  3. T Plant secondary containment and leak detection upgrades

    International Nuclear Information System (INIS)

    Carlson, T.A.

    1995-01-01

    The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site

  4. LS1: electrical engineering upgrades and consolidation

    International Nuclear Information System (INIS)

    Duval, F.

    2012-01-01

    3 different types of activities are planned by the Engineering Department Electrical Engineering (EN-EL) Group for the first long shut down (LS1). First, the consolidation of EN-EL's ageing infrastructure elements. It is part of a 15- year programme aiming at increasing the reliability and availability of the power distribution network. Secondly, the maintenance of the accelerators infrastructure. In addition to the usual periodic operations and those delayed until LS1, the group will address more demanding activities like the replacement campaigns for irradiated cables and non-radiation resistant fibres as well as the removal of unused cables in particularly overcrowded areas. Thirdly, a vast amount of user copper and optical fibre cabling requests: EN-EL estimates that only 50% of LS1 requests are currently known. The main activities will be EN-EL's contributions to the R2E project, BE-BI upgrade projects, and the RF upgrade project in SPS BA3

  5. 10 years and 20,000 sources: the offsite source recovery project

    Energy Technology Data Exchange (ETDEWEB)

    Whitworth, Julia R [Los Alamos National Laboratory; Abeyta, Cristy L [Los Alamos National Laboratory; Pearson, Michael W [Los Alamos National Laboratory

    2009-01-01

    The Global Threat Reduction Initiative's (GTRI) Offsite Source Recovery Project (OSRP) has been recovering excess and unwanted sealed sources for ten years. In January 2009, GTRI announced that the project had recovered 20,000 sealed radioactive sources. This project grew out of early efforts at Los Alamos National Laboratory (LANL) to recover and disposition excess Plutonium-239 (Pu-239) sealed sources that were distributed in the 1960s and 1970s under the Atoms for Peace Program. Sealed source recovery was initially considered a waste management activity, as evidenced by its initial organization under the Department of Energy's (DOE's) Environmental Management (EM) program. After the terrorist attacks of 2001, however, the interagency community began to recognize the threat posed by excess and unwanted radiological material, particularly those that could not be disposed at the end of their useful life. After being transferred to the National Nuclear Security Administration (NNSA) to be part of GTRI, OSRP's mission was expanded to include not only material that would be classified as Greater-than-Class-C (GTCC) when it became waste, but also any other materials that might be a 'national security consideration.' This paper discusses OSRP's history, recovery operations, expansion to accept high-activity beta-gamma-emitting sealed sources and devices and foreign-possessed sources, and more recent efforts such as cooperative projects with the Council on Radiation Control Program Directors (CRCPD) and involvement in GTRI's Search and Secure project. Current challenges and future work will also be discussed.

  6. Upgrading of radon's type near surface repository in Latvia

    International Nuclear Information System (INIS)

    Abramenkovs, A.

    2006-01-01

    In 1959, the Soviet government decided to construct the near surface radioactive wastes repository 'Radons' near the Baldone city. It was put in operation in 1962. The changes in the development of the repository were induced by the necessarily to upgrade it for disposal of radioactive wastes from the decommissioning of the Salaspils Research Reactor (SRR). The safety assessment of repository was performed during 2000-2001 under the PHARE project for necessary upgrades of repository. The outline design for new vaults and interim storage for long lived radioactive wastes was elaborated during 2003-2004 years. The Environmental Impact Assessment (EIA) for upgrade of Baldone repository was performed during 2004-2005 years. It was found, that additional efforts must be devoted for solution of social aspects o for successful operation and upgrade of repository. It was shown by EIA, that the local population has a negative opinion against the upgrade of repository in Latvia. The main recommendations for upgrades were connected with increasing the safety of repository, increasing of PR activities for education of society and developing of compensation mechanism for local municipality. (author)

  7. Modernization and power upgrading of the Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Keskinen, A. [IVO Power Engineering Ltd., Vantaa (Finland)

    1997-12-31

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.). 4 refs.

  8. Modernization and power upgrading of the Loviisa NPP

    International Nuclear Information System (INIS)

    Keskinen, A.

    1997-01-01

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.)

  9. Modernization and power upgrading of the Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Keskinen, A [IVO Power Engineering Ltd., Vantaa (Finland)

    1998-12-31

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.). 4 refs.

  10. Seismic review of vault for MFTF upgrade project

    International Nuclear Information System (INIS)

    Franklin, H.A.

    1983-01-01

    This letter report was prepared in accordance with the scope of work for the preconceptual seismic evaluation of the (α + T) Tandem Mirror Fusion Machine concrete vault. The scope of the work was developed with the assistance of the Bechtel site representative Dr. Sunil Ghose. The report contains comments and preconceptual recommendations on wall upgrading for an 150-ton crane installation, concrete vault seismic capability for (α + T) conditions, and recommendations for future work

  11. Integrated oil production and upgrading using molten alkali metal

    Science.gov (United States)

    Gordon, John Howard

    2016-10-04

    A method that combines the oil retorting process (or other process needed to obtain/extract heavy oil or bitumen) with the process for upgrading these materials using sodium or other alkali metals. Specifically, the shale gas or other gases that are obtained from the retorting/extraction process may be introduced into the upgrading reactor and used to upgrade the oil feedstock. Also, the solid materials obtained from the reactor may be used as a fuel source, thereby providing the heat necessary for the retorting/extraction process. Other forms of integration are also disclosed.

  12. Biogas upgrading to biomethane. Proceedings; Biogasaufbereitung zu Biomethan. Tagungsband

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-05

    Within the 6th Hanauer Dialogue 'Biogas upgrading to biomethane' at 21st February, 2008, the following lectures were held: (a) Processing of biogas - an introduction (Michael Beil); (b) The climate protecting targets of the Federal Republic of Germany: Which role will play the upgrading of biogas, and which legal boundary conditions are created by the Federal Government? (Uwe Holzhammer); (c) Future strategy: CH{sub 4} grids (Juergen Schmid); (d) Biogas upgrading and biomethane utilization in Sweden (Anneli Petersson); (e) Biogas upgrading and utilization of bio methane in Switzerland (Arthur Wellinger); (f) Biogas upgrading by means of pressure swing adsorption (Alfons Schulte-Schulze Berndt); (g) Biogas upgrading by means of pressurized water washing (Ulf Richter); (h) Biogas upgrading for feeding in public grids. The case of biogas plant Bruck a.d. Leitha (Michael Harasek); (i) Biogas upgrading by means of chemical absorption according to the LP Cooab process (Jerome van Beek); (j) Practical experiences in unpressurized amine washing MT bio methane (Karsten Wuensche); (k) Biogas upgrading by means of organic physical washing with HAASE biogas amplifiers (Roland Kahn); (l) Upgrading using cryogenic technology; the GPP registered -system (Jeroen de Pater); (m) Micro Gas Distribution Systems: Alternatives to biogas upgrading and grid injection (Michael Beil, Bernd Krautkremer); (n) Feeding of exchange gas. The case of project Straelen and Kerpen (Frank Schaefer); (o) Feeding of biogas from the view of grid operators (Norbert Nordmeyer); BIOGASMAX: Biogas as Vehicle Fuel - Market Expansion to 2020 Air Quality (Michael Beil, Uwe Hoffstede); (p) Study: Feeding of biogas into the natural gas distribution system (Fachagentur Nachwachsende Rohstoffe).

  13. National Spherical Torus Experiment (NSTX) Center Stack Upgrade

    International Nuclear Information System (INIS)

    Neumeyer, C.; Avasarala, S.; Chrzanowski, J.; Dudek, L.; Fan, H.; Hatcher, H.; Heitzenroeder, P.; Menard, J.; Ono, M.; Ramakrishnan, S.; Titus, P.; Woolley, R.; Zhan, H.

    2009-01-01

    The purpose of the NSTX Center Stack Upgrade project is to expand the NSTX operational space and thereby the physics basis for next-step ST facilities. The plasma aspect ratio (ratio of plasma major to minor radius) of the upgrade is increased to 1.5 from the original value of 1.26, which increases the cross sectional area of the center stack by a factor of ∼ 3 and makes possible higher levels of performance and pulse duration.

  14. MAST Upgrade – Construction Status

    Energy Technology Data Exchange (ETDEWEB)

    Milnes, Joe, E-mail: Joe.Milnes@ccfe.ac.uk; Ayed, Nizar Ben; Dhalla, Fahim; Fishpool, Geoff; Hill, John; Katramados, Ioannis; Martin, Richard; Naylor, Graham; O’Gorman, Tom; Scannell, Rory

    2015-10-15

    Highlights: • Outlines unique capability of MAST-U, including divertor and diagnostic capability. • Describes progress made in the manufacture and assembly of key MAST-U components. • Highlights the design challenges that have been overcome. • Lists the key lessons learned thus far in the project. - Abstract: The Mega Amp Spherical Tokamak (MAST) is the centre piece of the UK fusion research programme. In 2010, a MAST Upgrade programme was initiated with three primary objectives, to contribute to: (1) testing reactor concepts (in particular exhaust solutions via a flexible divertor allowing Super-X and other extended leg configurations); (2) adding to the knowledge base for ITER (by addressing important plasma physics questions and developing predictive models to help optimise ITER performance of ITER) and (3) exploring the feasibility of using a spherical tokamak as the basis for a fusion Component Test Facility. With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progress in delivering the upgraded diagnostic capability, the modification and upgrading of the NBI heating systems and the complete overhaul of the machine control infrastructure, including a new control room with full remote participation facilities.

  15. VISIR upgrade overview and status

    Science.gov (United States)

    Kerber, Florian; Käufl, Hans Ulrich; Baksai, Pedro; Dobrzycka, Danuta; Finger, Gert; Ives, Derek; Jakob, Gerd; Lagadec, Eric; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Moerchen, Margaret; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Siebenmorgen, Ralf; Silber, Armin; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Venema, Lars; Weilenmann, Ueli; Yegorova, Irina

    2012-09-01

    We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As Aquarius detector array (Raytheon) which has demonstrated very good performance (sensitivity, stability) in the laboratory IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a userdefined constraint on water vapour. Improved pipelines based on the ESO Reflex concept will provide better support to astronomers. The upgraded VISIR will be a powerful instrument providing background limited performance for diffraction-limited observations at an 8-m telescope. It will offer synergy with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey work (e.g. VISTA, WISE). In addition it will bring confirmation of the technical readiness and scientific value of several aspects of potential mid-IR instrumentation at Extremely Large Telescopes. The intervention on VISIR and installation of hardware has been completed in July and commissioning will take place during July and August. VISIR is scheduled to be available to the users starting Oct 2012.

  16. Modeling of Dipole and Quadrupole Fringe-Field Effects for the Advanced Photon Source Upgrade Lattice

    Energy Technology Data Exchange (ETDEWEB)

    Borland, M.; Lindberg, R.

    2017-06-01

    The proposed upgrade of the Advanced Photon Source (APS) to a multibend-achromat lattice requires shorter and much stronger quadrupole magnets than are present in the existing ring. This results in longitudinal gradient profiles that differ significantly from a hard-edge model. Additionally, the lattice assumes the use of five-segment longitudinal gradient dipoles. Under these circumstances, the effects of fringe fields and detailed field distributions are of interest. We evaluated the effect of soft-edge fringe fields on the linear optics and chromaticity, finding that compensation for these effects is readily accomplished. In addition, we evaluated the reliability of standard methods of simulating hardedge nonlinear fringe effects in quadrupoles.

  17. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  18. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    International Nuclear Information System (INIS)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park

  19. Upgrading of the Budapest reactor

    International Nuclear Information System (INIS)

    Rosta, L.

    1986-10-01

    The increasing importance of neutron sources, high demand for irradiation and experimental facilities as well as improved safety requirements in the 'eighties, necessitate not only a technical modernization of the Reactor but an overall upgrade including instrumentation. Such a reconstruction was decided by the Hungarian governement in 1983

  20. ATLAS upgrades for the next decades

    CERN Document Server

    Hopkins, Walter; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred \\ifb\\ expected for LHC running to 3000 fb$^{-1}$ by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for...

  1. Analysis of integrated plant upgrading/life extension programs

    International Nuclear Information System (INIS)

    McCutchan, D.A.; Massie, H.W. Jr.; McFetridge, R.H.

    1988-01-01

    A present-worth generating cost model has been developed and used to evaluate the economic value of integrated plant upgrading life extension project in nuclear power plants. This paper shows that integrated plant upgrading programs can be developed in which a mix of near-term availability, power rating, and heat rate improvements can be obtained in combination with life extension. All significant benefits and costs are evaluated from the viewpoint of the utility, as measured in discounted revenue requirement differentials between alternative plans which are equivalent in system generating capacity. The near-term upgrading benefits are shown to enhance the benefit picture substantially. In some cases the net benefit is positive, even if the actual life extension proves to be less than expected

  2. Transnational companies as a source of skill upgrading

    DEFF Research Database (Denmark)

    Vind, Ingeborg

    2008-01-01

      Employment and training in TNCs constitute a potential route through which FDI-led industrialization can contribute to national and regional development and economic growth. The article explores this link through the case of TNCs in the electronics industry in Ho Chi Minh City, Vietnam. The skill...... upgrading contribution of TNCs is related to the type of factories located in Vietnam and the role they play in regional production networks using a model combining the reverse product cycle and regional waves of FDI. Most electronics factories in Vietnam are ‘reproduction factories' with mature technology...

  3. Thes - Website for Thermal Shields Upgrade Management

    CERN Document Server

    Micula, Adina

    2013-01-01

    There are a total of 1695 thermal shields (TS) in the interconnections between the superconducting magnets. During LHC Long Shutdown 1 (LS1) all of these TS are being upgraded with a new fixation design. This procedure involves the transport of all the TS from LHC to a workshop on the surface where they are being modified and the subsequent transport of the upgraded TS back to the tunnel where they are laid on the cryostats and await the closure of the interconnection. These operations have to be carefully coordinated in order to ensure that there are always enough modified TS to satisfy the demand in the tunnel and respect the time constraint imposed by the schedule of LS1. As part of my summer project, I developed a database driven website whose aim is to enable the TS upgrade monitoring.

  4. Status of the Short-Pulse X-ray Project (SPX) at the Advanced Photon Source (APS)

    International Nuclear Information System (INIS)

    Nassiri, R.; Arnold, N.D.; Berenc, G.; Borland, M.; Bromberek, D.J.; Chae, Y.-C.; Decker, G.; Emery, L.; Fuerst, J.D.; Grelick, A.E.; Horan, D.; Lenkszus, F.; Lill, R.M.; Sajaev, V.; Smith, T.L.; Waldschmidt, G.J.; Wu, G.; Yang, B.X.; Zholents, A.; Byrd, J.M.; Doolittle, L.R.; Huang, G.; Cheng, G.; Ciovati, G.; Henry, J.; Kneisel, P.; Mammosser, J.D.; Rimmer, R.A.; Turlington, L.; Wang, H.

    2011-01-01

    The Advanced Photon Source Upgrade project (APS-U) at Argonne includes implementation of Zholents deflecting cavity scheme for production of short x-ray pulses. This is a joint project between Argonne National Laboratory, Thomas Jefferson National Laboratory, and Lawrence Berkeley National Laboratory. This paper describes performance characteristics of the proposed source and technical issues related to its realization. Ensuring stable APS storage ring operation requires reducing quality factors of these modes by many orders of magnitude. These challenges reduce to those of the design of a single-cell SC cavity that can achieve the desired operating deflecting fields while providing needed damping of all these modes. The project team is currently prototyping and testing several promising designs for single-cell cavities with the goal of deciding on a winning design in the near future. Here we describe the approach undertaken and report the preliminary results. The concept of using transverse superconducting rf deflecting cavities to produce high-repetition-rate picoseconds x-rays with the APS has been previously described. Briefly, two cavities are required: the first cavity to impose a chirp on the electron beam and a second cavity to cancel the effects on the electron beam of the first cavity. The cavities must have a deflecting mode frequency that is a harmonic h of the APS storage ring rf frequency, 352 MHz A workable choice of h=8 corresponds to a deflecting cavity frequency of 2815 MHz. R and D activities include design and prototyping of superconducting deflecting cavities and components, cryomodule, low-level rf, particle/optical beam diagnostics, and timing/synchronization.

  5. Small-scale upgrading and refinement of biogas; Smaaskalig uppgradering och foeraedling av biogas

    Energy Technology Data Exchange (ETDEWEB)

    Blom, Helena; Mccann, Michael; Westman, Johan (Poeyry SwedPower AB, Stockholm (Sweden))

    2012-02-15

    Small-scale upgrading and refinement of biogas is a report which aims to compile the state of knowledge in small-scale biogas upgrading. The project have been a collaboration with Agrovaest and Energy Farm and was funded by the Foundation for Agricultural Research, Western Goetaland and the Agriculture Department. The technology available for small scale upgrade has been examined from the technical and economic standpoint. An economic comparison has been made and the production of upgraded biogas has been estimated for different raw gas flows. The work also contains information related to biogas production, upgrading and a comparison of liquid biogas, DME and Ecopar-diesel

  6. J-PARC accelerator and neutrino beamline upgrade programme

    Science.gov (United States)

    Friend, M.

    2017-09-01

    The 30 GeV proton beam from the J-PARC Main Ring (MR) accelerator is used to produce a world-class conventional neutrino beam - the neutrino source for the J-PARC long-baseline neutrino programme, including the current T2K experiment and proposed future experiments. Planned upgrades to increase the beam power of the MR from the current ˜400 kW to the design power of 750 kW and beyond, to 1.3+ MW, are underway. These include hardware modifications, such as upgrades of the MR magnet power supplies, RF systems, and feedback systems, as well as a change of the MR beam betatron tune point. Upgrades to the neutrino beamline, such as to the proton beam monitoring, horns, and radioactive material handling, will also be required to accommodate the increased proton beam power. An overview of planned J-PARC MR and neutrino facility upgrades is given.

  7. Lessons learned in digital upgrade projects digital control system implementation at US nuclear power stations

    International Nuclear Information System (INIS)

    Kelley, S.; Bolian, T. W.

    2006-01-01

    AREVA NP has gained significant experience during the past five years in digital upgrades at operating nuclear power stations in the US. Plants are seeking modernization with digital technology to address obsolescence, spare parts availability, vendor support, increasing age-related failures and diminished reliability. New systems offer improved reliability and functionality, and decreased maintenance requirements. Significant lessons learned have been identified relating to the areas of licensing, equipment qualification, software quality assurance and other topics specific to digital controls. Digital control systems have been installed in non safety-related control applications at many utilities within the last 15 years. There have also been a few replacements of small safety-related systems with digital technology. Digital control systems are proving to be reliable, accurate, and easy to maintain. Digital technology is gaining acceptance and momentum with both utilities and regulatory agencies based upon the successes of these installations. Also, new plants are being designed with integrated digital control systems. To support plant life extension and address obsolescence of critical components, utilities are beginning to install digital technology for primary safety-system replacement. AREVA NP analyzed operating experience and lessons learned from its own digital upgrade projects as well as industry-wide experience to identify key issues that should be considered when implementing digital controls in nuclear power stations

  8. The North West Sturgeon Upgrader: Good Money after Bad?

    Directory of Open Access Journals (Sweden)

    F.L. Ted Morton

    2015-04-01

    Full Text Available The North West Upgrader (NWU project illustrates the risks of government-led efforts to diversify Alberta’s economy. What began as a low-risk, low-cost project to encourage domestic bitumen upgrading has morphed into a multi-billion dollar boondoggle with high risks for Alberta taxpayers. Originally, the Government of Alberta (GOA intended to collect bitumen from producers in lieu of royalties and sell it to provincial upgraders, adding value to the commodity and creating jobs and revenues in Alberta. The private sector was to build and finance the new upgraders, as well as assume the market risks of low margins. The 2008 financial collapse effectively killed that plan. With just one prospect (NWU remaining, the Stelmach government decided to be more than the middleman. The GOA committed to retain ownership of the bitumen up to the point of sale, pay NWU a toll for the processing, and then sell the upgraded product. Under a new “take or pay” arrangement, the GOA assumed liabilities estimated at $19 billion over the 30-year contract with NWU, as well as the market risk of having to sell the upgraded product at below costs. As four different premiers and six different energy ministers cycled through Edmonton, construction costs soared to over $8 billion. The original $6.5 billion cap on the GOA’s liability for construction costs disappeared, and the GOA—and by extension, Alberta taxpayers— are now on the hook for $26 billion in processing payments — the equivalent of $63 per barrel. Falling oil prices are further undermining the prospects for the investment to break even. Written from a rare insider’s perspective, this paper analyzes the lack of effective government oversight and due diligence surrounding the North West Upgrade. Rather than being an exception, NWU fits the larger and longer pattern of failed “forced-growth” diversification initiatives in Alberta and other provinces. Alberta politicians should think long and

  9. 10 years and 20,000 sources: the GTRI offsite source recovery project

    International Nuclear Information System (INIS)

    Whitworth, Julia; Streeper, Charles; Cuthbertson, Abigail

    2009-01-01

    Full text: The Global Threat Reduction Initiative's (GTRI) Offsite Source Recovery Project (OSRP) has been recovering excess and unwanted radioactive sealed sources for ten years. In January 2009, GTRI announced that the project had recovered 20,000 sealed radioactive sources. This project grew out of early efforts at Los Alamos National Laboratory (LANL) to recover and disposition excess Plutonium-239 ( 239 Pu) sealed sources that were distributed in the 1960s and 1970s under the Atoms for Peace Program. Decades later, these sources began to exceed their design life or fall out of regular use. Sealed source recovery was initially considered a waste management activity, but after the terrorist attacks of 2001, the interagency community began to recognize the threat posed by excess and unwanted radiological materials, particularly those that could not be disposed at the end of their useful life. After being transferred to the U.S. National Nuclear Security Administration (NNSA) to be part of GTRI, OSRP's mission was expanded to include not only material that would be classified as Greater-than-Class-C (GTCC) when it became waste, but also any other materials that might constitute a 'national security consideration'. This paper discusses OSRP's history, recovery operations, expansion to accept high-activity beta-gamma-emitting sealed sources and devices and foreign-possessed sources, and more recent efforts such as involvement in GTRI's Search and Secure project. Current challenges and future work will also be discussed

  10. Safety upgrading at PAKS Nuclear Power Plant

    International Nuclear Information System (INIS)

    Bajsz, J.; Elter, J.

    2000-01-01

    The operation of Paks NPP has reached its half time. Until this time the plant fulfilled expectations raised before its construction: the four units have produced safely and reliably more than 200 TWh electricity. The production of the plant has been at the stable level since its construction and has provided 43-38 % of electricity consumed in Hungary. The annual production is around 14 TWh, which means a load factor higher than 85 %. Safety upgrading activities [1] at Paks had started in the late eighties, when the commissioning work of units 3 and 4 were carried out. That time the main emphases were put to lessons learned of the TMI and Chernobyl accidents. The international reviews hosted by our plant widened our review's scope. To systematize our approach a complete safety review, the AGNES (Advanced General Safety and New Evaluation of Safety) project was started in 1991. The goal of the project was to evaluate to what extent Paks NPP satisfied the current international safety expectations and to help in determining the priorities for safety enhancement and upgrading measures. The project completed in 1994 ranked our safety upgrading measures by safety significance, which became a basis for technical design work and financial scheduling. The other important outcome of the AGNES project was the introduction the Periodical Safety Review regime by our nuclear authority. These periodical reviews held after 10 years of operation offer the possibility - and obligation for the licensee - to perform a comprehensive assessment of the safety of the plant, to evaluate the integral effects of changes of circumstances happened during the review period. The goal of these reviews is to deal with cumulative effects of NPP ageing, modifications, operating experience and technical developments aimed at ensuring a high level of safety throughout plant service life. The execution of our safety-upgrading program is well advancing. For the whole program from 1996 to 2002 250

  11. Environmental assessment for the electric utility system distribution, replacements and upgrades at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    1992-04-01

    This Environmental Assessment evaluates the environmental effects resulting from the distribution of new electrical service, replacement of inadequate or aging equipment, and upgrade of the existing electrical utility system at Lawrence Livermore National Laboratory. The projects assessed herein do not impact cultural or historic resources, sensitive habitats or wetlands and are not a source of air emissions. The potential environmental effects that do result from the action are fugitive dust and noise from construction and the disposal of potentially contaminated soil removed from certain limited areas of the LLNL site as a result of trenching for underground transmission lines. The actions described in this assessment represent an improved safety and reliability to the existing utility system. Inherent in the increased reliability and upgrades is a net increase in electrical capacity, with future expansion reserve. As with any electrical device, the electrical utility system has associated electric and magnetic fields that present a potential source of personnel exposure. The potential is not increased, however, beyond that which already exists for the present electrical utility system

  12. Supplement analysis for the proposed upgrades to the tank farm ventilation, instrumentation, and electrical systems under Project W-314 in support of tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    1997-05-01

    The mission of the TWRS program is to store, treat, and immobilize highly radioactive tank waste in an environmentally sound, safe, and cost-effective manner. Within this program, Project W-314, Tank Farm Restoration and Safe Operations, has been established to provide upgrades in the areas of instrumentation and control, tank ventilation, waste transfer, and electrical distribution for existing tank farm facilities. Requirements for tank farm infrastructure upgrades to support safe storage were being developed under Project W-314 at the same time that the TWRS EIS alternative analysis was being performed. Project W-314 provides essential tank farm infrastructure upgrades to support continued safe storage of existing tank wastes until the wastes can be retrieved and disposed of through follow-on TWRS program efforts. Section4.0 provides a description of actions associated with Project W-314. The TWRS EIS analyzes the environmental consequences form the entire TWRS program, including actions similar to those described for Project W-314 as a part of continued tank farm operations. The TWRS EIS preferred alternative was developed to a conceptual level of detail to assess bounding impact areas. For this Supplement Analysis, in each of the potential impact areas for Project W-314, the proposed action was evaluated and compared to the TWRS EIS evaluation of the preferred alternative (Section 5.0). Qualitative and/or quantitative comparisons are then provided in this Supplement Analysis to support a determination on the need for additional National Environmental Policy Act (NEPA) analysis. Based on this Supplement Analysis, the potential impacts for Project W-314 would be small in comparison to and are bounded by the impacts assessed for the TWRS EIS preferred alternative, and therefore no additional NEPA analysis is required (Section 7.0)

  13. A summary of the regional upgrader business plan

    International Nuclear Information System (INIS)

    Carpenter, J.S.

    1991-01-01

    The stakeholders with potential interests in an Alberta regional upgrader for bitumen, heavy oil, or refinery residue were identified and a reasonably comprehensive business plan for such an upgrader was created and analyzed. Assuming a plant accepting 30,000 bbl/d of feedstock using known hydrocracking and hydroprocessing technologies, producing a synthetic crude oil of a quality good enough to substitute for Alberta light crude in existing refineries, the risks, financing arrangements, and base case economics were examined. According to reasonable price forecasts and a socio-economic benefit assessment, there are enough benefits in such an upgrader to make its construction attractive in the near term. However, conventional investment economics make it unlikely that such a project could be supported in Alberta's current business environment. Accordingly, the business plan was revised to reduce risks and increase profitability to equity holders. The plant capacity would be doubled, with a major oil company acquiring half the output for its own production at less than half the installed cost. The rest of the plant would be owned by government and by smaller producers who would gain access to the upgrader feedstock capacity. A collar mechanism is offered to reduce bitumen price risks without impairing upgrader economics. A number of niche opportunities are also identified within the regional upgrader concept that would further enhance the return through lower costs. 2 figs., 4 tabs

  14. Linac upgrade plan for the KEK B-Factory

    International Nuclear Information System (INIS)

    Enomoto, Atsushi; Anami, Shozo; Kamitani, Takuya; Hanaki, Hirofumi; Shidara, Tetsuo; Sato, Isamu

    1993-01-01

    In the KEK B-Factory plan, e+/e- collider rings with 3.5- GeV positions and 8-GeV electrons are being considered, and full-energy injection from the existing linac is required. The acceleration energy of the linac must be upgraded from 2.5 to 8 GeV. The most effective way has been searched from several points of view, such as the beam quality, ease of beam handling, and construction. This article describes the basic plan of the energy upgrade and recent progress regarding this project

  15. The APS control system network upgrade

    International Nuclear Information System (INIS)

    Sidorowicz, K. v.; Leibfritz, D.; McDowell, W. P.

    1999-01-01

    When it was installed,the Advanced Photon Source (APS) control system network was at the state-of-the-art. Different aspects of the system have been reported at previous meetings [1,2]. As loads on the controls network have increased due to newer and faster workstations and front-end computers, we have found performance of the system declining and have implemented an upgraded network. There have been dramatic advances in networking hardware in the last several years. The upgraded APS controls network replaces the original FDDI backbone and shared Ethernet hubs with redundant gigabit uplinks and fully switched 10/100 Ethernet switches with backplane fabrics in excess of 20 Gbits/s (Gbps). The central collapsed backbone FDDI concentrator has been replaced with a Gigabit Ethernet switch with greater than 30 Gbps backplane fabric. Full redundancy of the system has been maintained. This paper will discuss this upgrade and include performance data and performance comparisons with the original network

  16. Immediate catalytic upgrading of soybean shell bio-oil

    International Nuclear Information System (INIS)

    Bertero, Melisa; Sedran, Ulises

    2016-01-01

    The pyrolysis of soybean shell and the immediate catalytic upgrading of the bio-oil over an equilibrium FCC catalyst was studied in order to define its potential as a source for fuels and chemicals. The experiments of pyrolysis and immediate catalytic upgrading were performed at 550 °C during 7 min with different catalysts to oil relationships in an integrated fixed bed pyrolysis-conversion reactor. The results were compared under the same conditions against those from pine sawdust, which is a biomass source commonly used for the production of bio-oil. In the pyrolysis the pine sawdust produced more liquids (61.4%wt.) than the soybean shell (54.7%wt.). When the catalyst was presented, the yield of hydrocarbons increased, particularly in the case of soybean shell, which was four time higher than in the pyrolysis. The bio-oil from soybean shell produced less coke (between 3.1 and 4.3%wt.) in its immediate catalytic upgrading than that from pine sawdust (between 5 and 5.8%wt.), due to its lower content of phenolic and other high molecular weight compounds (three and five times less, respectively). Moreover, soybean shell showed a higher selectivity to hydrocarbons in the gasoline range, with more olefins and less aromatic than pine sawdust. - Highlights: • Soybean shell is a possible source of fuels with benefits as compared to pine sawdust. • Bio-oils upgraded over FCC catalyst in an integrated pyrolysis-conversion reactor. • Pine sawdust bio-oil had more phenols than soybean shell bio-oil. • Soybean shell bio-oil produced more hydrocarbons in gasoline range and less coke.

  17. Linac design study for an intense neutron-source driver

    International Nuclear Information System (INIS)

    Lynch, M.T.; Browman, A.; DeHaven, R.; Jameson, R.; Jason, A.; Neuschaefer, G.; Tallerico, P.; Regan, A.

    1993-01-01

    The 1-MW spallation-neutron source under design study at Los Alamos is driven by a linac-compressor-ring scheme that utilizes a large portion of the existing Los Alamos Meson Physics Facility (LAMPF) linac, as well as the facility infrastructure. The project is referred to as the National Center for Neutron Research (NCNR). A second phase of the proposal will upgrade the driver power to 5 MW. A description of the 1-MW scheme is given in this paper. In addition, the upgrade path to the substantial increase of beam power required for the 5 MW scenario is discussed

  18. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

      LS1 and Phase 1 The detector projects targeting LS1 are progressing well, and a fully integrated schedule developed by Technical Coordination includes installation milestones and a detailed work-plan. The first chambers of the RPC system were produced and are being qualified. Production will ramp up this year to a rate of 20 chambers per month. 32 chambers of the CSC system have been fabricated for the ME4/2 CSC stations, and production proceeds at a rate of 4 per month. The new ME1/1 Front-End Board is in production and the off-detector electronics integration tests are ongoing. The new Theta Trigger Boards for the DT readout production is started and the relocation of the Sector Collector boards with new Optical Links as been successfully tested. All the components for the upgrade of the Forward Hadron Calorimeter PMTs have been received at CERN and assemblies are being qualified. The situation is similar for the Hadron Outer Calorimeter new SiPMs and readout modules. Three projects are plan...

  19. Hardware upgrade for A2 data acquisition

    Energy Technology Data Exchange (ETDEWEB)

    Ostrick, Michael; Gradl, Wolfgang; Otte, Peter-Bernd; Neiser, Andreas; Steffen, Oliver; Wolfes, Martin; Koerner, Tito [Institut fuer Kernphysik, Mainz (Germany); Collaboration: A2-Collaboration

    2014-07-01

    The A2 Collaboration uses an energy tagged photon beam which is produced via bremsstrahlung off the MAMI electron beam. The detector system consists of Crystal Ball and TAPS and covers almost the whole solid angle. A frozen-spin polarized target allows to perform high precision measurements of polarization observables in meson photo-production. During the last summer, a major upgrade of the data acquisition system was performed, both on the hardware and the software side. The goal of this upgrade was increased reliability of the system and an improvement in the data rate to disk. By doubling the number of readout CPUs and employing special VME crates with a split backplane, the number of bus accesses per readout cycle and crate was cut by a factor of two, giving almost a factor of two gain in the readout rate. In the course of the upgrade, we also switched most of the detector control system to using the distributed control system EPICS. For the upgraded control system, some new tools were developed to make full use of the capabilities of this decentralised slow control and monitoring system. The poster presents some of the major contributions to this project.

  20. Upgrade of the CMS hardron calorimeter for an upgraded LHC

    OpenAIRE

    Anderson, Jake

    2012-01-01

    The CMS barrel and endcap hadron calorimeters (Hcal) upgrading the current photo-sensors are hybrid photodiodes (HPDs) to meet the demands of the upgraded luminosity of the LHC. A key aspect of the Hcal upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at L1 trigger. The increased segmentation can be achieved by replacing the HPD's with multi-pixel Geiger-mode avalanche photodiodes. The upgraded electron...

  1. Advanced neutron source project

    International Nuclear Information System (INIS)

    Gorynina, L.V.; Proskuryakov, S.F.; Tishchenko, V.A.; Uzhanova, V.V.

    1991-01-01

    The project of the ANS improved neutron source intended for fundamental researches in nuclear physics and materials testing is considered. New superhigh-flux heavy-water 350 MW reactor is used for the source creation. The standard fuel is uranium silicide (U 3 Si 2 ). Reactor core volume equals 67.4 l and average power density is 4.9 MW/l. Neutron flux density is 10 16 neutron/(cm 2 xs). The facility construction begin is planned for 1996. The first experiments should be accomplished in 2000

  2. Dipole power supply for National Synchrotron Light Source Booster upgrade

    International Nuclear Information System (INIS)

    Olsen, R.; Dabrowski, J.; Murray, J.

    1992-01-01

    The booster at the NSLS is being upgraded from .75 to 2 pulses per second. To accomplish this, new power supplies for the dipole, quadrupole, and sextupole magnets have been designed and are being constructed. This paper will outline the design of the dipole power supply and control system, and will present results obtained thus far

  3. Upgrading and Expanding Lustre Storage for use with the WLCG

    Science.gov (United States)

    Traynor, D. P.; Froy, T. S.; Walker, C. J.

    2017-10-01

    The Queen Mary University of London Grid site’s Lustre file system has recently undergone a major upgrade from version 1.8 to the most recent 2.8 release, and a capacity increase to over 3 PB. Lustre is an open source, POSIX compatible, clustered file system presented to the Grid using the StoRM Storage Resource Manager. The motivation and benefits of upgrading including hardware and software choices, are discussed. The testing, performance improvements and data migration procedure are outlined as is the source code modifications needed for StoRM compatibility. Benchmarks and real world performance are presented and future plans discussed.

  4. Instrumentation and control doctrine for VVER upgrading

    International Nuclear Information System (INIS)

    Pernette, R.; Cucciniello, J.; Trebot, R.

    1997-01-01

    The main results are reported of analyses carried out on the WWER-400 and WWER-1000 series, and the reasons are summed up underlying the decision to establish a policy of WWER instrumentation and control upgrading. It is shown that such a policy forms a key stage in any upgrading project and contributes to the improvement of reactor safety at several levels: it helps to optimize the integration of safety requirements; it makes it easier to achieve a high level of automation and a better man-machine interaction; it should raise the culture of reactor safety. Four annexes demonstrate the factual fundamentals and structure of such a policy. (A.K.)

  5. AliPDU Package Upgrade

    CERN Document Server

    "Martin, Michael

    2015-01-01

    "AliPDU Package" is a set of script, panels, and datapoints designed in WinCC to manage and monitor PDU's. PDU is an essential component in the data center, in order to make data center working properly through the monitoring of power distribution and environmental condition of the data center. In this project "AliPDU Package" is upgraded so it can be used to monitor environmental condition of data center using PDU's and external environmental sensor connected to PDU.

  6. AliPDU Package Upgrade

    CERN Document Server

    Martin, Michael

    2015-01-01

    AliPDU Package is a set of script, panels, and datapoints designed in WinCC to manage and monitor PDU's. PDU is an essential component in the data center, in order to make data center working properly through the monitoring of power distribution and environmental condition of the data center. In this project "AliPDU Package" is upgraded so it can be used to monitor environmental condition of data center using PDU's and external environmental sensor connected to PDU.

  7. Status of the CMS Phase I pixel detector upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Spannagel, S., E-mail: simon.spannagel@desy.de

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  8. Status of the CMS Phase I Pixel Detector Upgrade

    CERN Document Server

    Spannagel, Simon

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase~I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  9. SPEAR 3 Upgrade Project: The Final Year

    International Nuclear Information System (INIS)

    Hettel, R

    2004-01-01

    During April, 2003, the SPEAR 2 storage ring, which served the high energy physics community from 1972 to 1987, and the synchrotron radiation community for an additional 15 years, was removed from its shielding tunnel in order to install the new 3-GeV, 500-mA SPEAR 3 light source. From May to November, SSRL will excavate the tunnel floor and pour a new concrete floor, and then install pre-assembled girders holding magnets, copper vacuum chambers, PEP-II-style rf cavities, and beam line front end components. At the same time, power supply, instrumentation and control, and other ancillary systems will be configured, leading to a commissioning period beginning in November 2003. The progress of accelerator component implementation and installation during the final year of the project will be reviewed

  10. FRIGG '95. ABB Atom's upgraded T/H loop

    International Nuclear Information System (INIS)

    Noren, T.

    1995-01-01

    The FRIGG '95 project is an upgrading and modernization of the FRIGG loop, ABB Atom's fuel test rig with BWR operating conditions. The current FRIGG loop with test section and heater rods is described, together with the modifications involved in the FRIGG '95 project, including the new unique tomographic void measuring system to be installed. Finally CFD (Computational Fluid Dynamics) is introduced. (orig) (8 refs., 10 figs.)

  11. A linac for the Spallation Neutron Source

    International Nuclear Information System (INIS)

    Jason, A.J.

    1998-01-01

    The Spallation Neutron Source Project (SNS), to be constructed at Oak Ridge National Laboratory, accelerates H - ions to an energy of 1.0 GeV with an average current of 1-mA for injection into an accumulator ring that produces the short intense burst of protons needed for the spallation-neutron source. The linac will be the most intense source of H - ions and as such requires advanced design techniques to meet project technical goals. In particular, low beam loss is stressed for the chopped beam placing strong requirements on the beam dynamics and linac construction. Additionally, the linac is to be upgraded to the 2- and 4-MW beam-power levels with no increase in duty factor. The author gives an overview of the linac design parameters and design choices made

  12. Upgrades for Offline Data Quality Monitoring at ATLAS

    CERN Document Server

    Joergensen, M D; The ATLAS collaboration; Frost, J

    2013-01-01

    The ATLAS offline data quality monitoring infrastructure functioned successfully during the 2010-2012 run of the LHC. During the 2013-14 long shutdown, a large number of upgrades will be made in response to user needs and to take advantage of new technologies - for example, deploying richer web applications, improving dynamic visualization of data, streamlining configuration, and moving applications to a common messaging bus. Additionally consolidation and integration activities will occur. We will discuss lessons learned so far and the progress of the upgrade project, as well as associated improvements to the data reconstruction and processing chain.

  13. Thermal System Upgrade of the Space Environment Simulation Test Chamber

    Science.gov (United States)

    Desai, Ashok B.

    1997-01-01

    The paper deals with the refurbishing and upgrade of the thermal system for the existing thermal vacuum test facility, the Space Environment Simulator, at NASA's Goddard Space Flight Center. The chamber is the largest such facility at the center. This upgrade is the third phase of the long range upgrade of the chamber that has been underway for last few years. The first phase dealt with its vacuum system, the second phase involved the GHe subsystem. The paper describes the considerations of design philosophy options for the thermal system; approaches taken and methodology applied, in the evaluation of the remaining "life" in the chamber shrouds and related equipment by conducting special tests and studies; feasibility and extent of automation, using computer interfaces and Programmable Logic Controllers in the control system and finally, matching the old components to the new ones into an integrated, highly reliable and cost effective thermal system for the facility. This is a multi-year project just started and the paper deals mainly with the plans and approaches to implement the project successfully within schedule and costs.

  14. Fermilab Linac Upgrade Conceptual Design: Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1989-07-01

    The goal of the Tevatron Collider Upgrade program is to improve the Collider luminosity and the fixed-target intensity. The Linac portion of this project will increase the energy of the existing 200- MeV linac to 400 MeV in order to reduce beam emittance degradation in the Booster.

  15. Upgrade and modernization of NBSR

    International Nuclear Information System (INIS)

    Williams, Robert E.

    1995-01-01

    The NBSR, a 20-MW research reactor operated by the National Institute of Standards and Technology, has become the leading US laboratory in neutron research. About 1000 scientists from 200 industries, government and foreign laboratories, and universities conducted experiments at the NBSR in 19931. Since 1990, when the first instruments in the Cold Neutron Research Facility (CNRF) became available, the number of research participants has doubled. A major program of modernization and facility upgrade was initiated in order to meet this growing demand, and to assure safe and reliable reactor operations for 30 additional years. A scheduled shutdown, begun in late May 1994, is nearing completion at this writing (May 1995). To upgrade the CNRF, the D 2 0 cold neutron source has been replaced with a liquid hydrogen cold source, and the remaining four neutron guides are being installed. In addition, the primary and secondary cooling systems have been modernized with the installation of plate heat exchangers, and the refueling system has been completely refurbished. Periodic maintenance is also being done. The entire D20 primary coolant inventory is about to be replaced, and new shim arms have been installed

  16. Particle combinations in the LHCb Upgrade trigger

    CERN Document Server

    Zhao, Fanyi

    2017-01-01

    The LHCb experiment will be upgraded during long shutdown II (2018-2020) to process inelastic proton-proton collisions at 30MHz in a software application and run at a higher instantaneous luminosity of $2\\times 10^{33}cm^{−2}s^{−1}$. Each of these collisions will contain substantially more proton-proton interactions and charged particles. It is important to identify the decay vertices of heavy-flavour hadrons produced by the primary proton-proton interaction in an efficient, CPU-performant manner. In this project, I will learn about the LHCb trigger and experimental programme and investigate alternative models for reconstructing these vertices, which may scale more efficiently to the upgraded trigger conditions than the current model.

  17. Improved beam extraction for a negative hydrogen ion source for the LHC injector chain upgrade, Linac4

    CERN Document Server

    Midttun, Øystein; Scrivens, Richard

    In the scope of an upgrade of the injector chain of CERN’s accelerator complex, a new linear accelerator, Linac4, is under construction. This accelerator will replace the existing 50 MeV proton linac, Linac2. By increasing the beam energy to 160 MeV, Linac4 makes it possible to double the brightness in the PSB, and ultimately increase the luminosity in the LHC. Linac4 will accelerate beams of negative hydrogen (H-) to be injected into the PSB by multi-turn, charge exchange injection. The ion source was initially based on the non-caesiated RF-volume source from DESY. However, the beam extraction from this source could not handle the 45 keV beam energy required by the RFQ. A new beam extraction system has therefore been designed, via IBSimu simulations [1], to extract and transport the H- ion beam respecting the Linac4 requirements. Key features of the extraction system is a tuneable puller voltage to adapt the extraction field to the ion and electron beam currents, and a magnetized Einzel lens to dump the co...

  18. Upgrades to the ISIS moderator configuration

    International Nuclear Information System (INIS)

    Taylor, A.D.

    1989-01-01

    The current ISIS moderator configuration, was designed in 1980 to provide a flexible set of beams for a hypothetical instrument suite. The use of fluid moderators at three different temperatures offering six faces to the instruments, has proved to be effective. In this paper we discuss an upgrade of these moderators in the light of the current and projected instrument configuration. (author)

  19. Current status of the IREN project

    International Nuclear Information System (INIS)

    Furman, W.I.

    1997-01-01

    A current status and a corrected time-schedule of the project of the new Intense Resonance Neutron pulsed source (IREN) realized in JINR (Dubna) for experiments dealing with fundamental and applied nuclear physics studies are discussed. This source is the upgraded variant of the existing IBR-30 pulsed booster. It consists of the 200 MeV electron linac and supplying by an electron beam the photo-neutron converter placed in the center of the very fast multiplying subcritical core. The existing buildings and beam infrastructure are planned to adopt for the new IREN source. The aim of the project is to improve essentially an energy resolution of the time-of-flight spectrometer and to increase twice (up to 10 15 n/sec) an integral neutron yield. An implementation of the IREN project has started in June 1994 with the planned end in December 1997. But due to mainly insufficient financing the approved time-schedule is shifted. Now most optimistic time of start-up of the neutron source is the end of 1999

  20. Possible neutral beam requirements for TFTR upgrades

    International Nuclear Information System (INIS)

    Prichard, B.A. Jr.; Little, R.; Post, D.E.; Schmidt, J.A.

    1977-01-01

    A discussion is provided of possible neutral beam requirements and constraints for a TFTR upgrade. The time scale is the early 80s and beams of 250 keV D 0 , probably using 65 ampere negative ion sources, existing power supplies and vacuum enclosures would be required

  1. Upgrading of oil palm wastes by radiation processing - project review

    International Nuclear Information System (INIS)

    Nahrul Khair Alang Md Rashid

    1998-01-01

    Early works on oil palm waste treatment at MINT started in 1984 with the objective of degrading EFB (Empty Fruit Bunches) by radiation. This idea was shared by JAERI that adopted the research project with MINT in 1986 under the Japanese Science and Technology Agency (STA) programme. The results of these preliminary works show that EFB can be degraded using gamma radiation at a dose of ranging from 500 to 1000 kGy - 50 to 100 times higher than what is considered to be the economic dose. It is generally accepted that the economics of radiation treatment process could only be realised if the treatment dose can be kept below 10 kGy, which was incidentally, during the course of this early works, found to be the pasteurisation dose for oil palm by - products. With these information, MINT and JAERI agreed to pursue further research in this area and formulated a bilateral research co-operation in radiation pasteurisation of EFB and subsequent degradation by cellulolytic fungi or mushrooms. The research has the objective of upgrading EFB, which was not considered as suitable for feed due to its known physical properties as coarse and highly fibrous, to animal feed as well as substrate for mushroom cultivation and enzyme production. In addition to the desire to provide an environment friendly method for waste disposal to a growing industry, the possibility of catalysing the development of livestock industry by commercial farming in the process is another motivation for this project. Malaysia is estimated to be only about 40% self-sufficient in beef production. Thus there is great opportunity for the growth and expansion of this industry in Malaysia. However, growth in ruminant population should not result in the alienation of land for pastures. Among the reasons for the lack of interest in livestock production through commercial farming is the unavailability of local feed material which could be cheaper than imported feed grains, particularly maize. Feed is one the main cost

  2. Upgrading of oil palm wastes by radiation processing - project review

    Energy Technology Data Exchange (ETDEWEB)

    Alang Md Rashid, Nahrul Khair [Malaysian Institute for Nuclear Technology Research (MINT), Bangi (Malaysia)

    1998-07-01

    Early works on oil palm waste treatment at MINT started in 1984 with the objective of degrading EFB (Empty Fruit Bunches) by radiation. This idea was shared by JAERI that adopted the research project with MINT in 1986 under the Japanese Science and Technology Agency (STA) programme. The results of these preliminary works show that EFB can be degraded using gamma radiation at a dose of ranging from 500 to 1000 kGy - 50 to 100 times higher than what is considered to be the economic dose. It is generally accepted that the economics of radiation treatment process could only be realised if the treatment dose can be kept below 10 kGy, which was incidentally, during the course of this early works, found to be the pasteurisationdose for oil palm by - products. With these information, MINT and JAERI agreed to pursue further research in this area and formulated a bilateral research co-operation in radiation pasteurisation of EFB and subsequent degradation by cellulolytic fungi or mushrooms. The research has the objective of upgrading EFB, which was not considered as suitable for feed due to its known physical properties as coarse and highly fibrous, to animal feed as well as substrate for mushroom cultivation and enzyme production. In addition to the desire to provide an environment friendly method for waste disposal to a growing industry, the possibility of catalysing the development of livestock industry by commercial farming in the process is another motivation for this project. Malaysia is estimated to be only about 40% self-sufficient in beef production. Thus there is great opportunity for the growth and expansion of this industry in Malaysia. However, growth in ruminant population should not result in the alienation of land for pastures. Among the reasons for the lack of interest in livestock production through commercial farming is the unavailability of local feed material which could be cheaper than imported feed grains, particularly maize. Feed is one the main cost

  3. Upgrading of Sergiev Posad department of Moscow NPO Radon

    International Nuclear Information System (INIS)

    Debieve, Pierre; Delecaut, Gregory; Vanleeuw, Daniel

    2007-01-01

    Available in abstract form only. Full text of publication follows: BELGATOM and IRE Consortium has been awarded by the European Commission end of 2005 to conduct a project entitled 'Upgrading of Sergiev Posad Department of Moscow NPO Radon and the assessment of the radiological impact in the area nearby'. The main aims to achieve in the frame of this Europe-aid Project are: - Improvement of the performance and the safety level of the present radwaste management system, taking into account the additional waste expected from the Kurchatov Institute rehabilitation and from the forecast decommissioning of Research Reactors on the territory of Moscow. - Basic design and assistance for the procurement of upgrading equipment related to: - radwaste sorting and pretreatment - replacement of the hydraulic system of the existing super-compactor - characterisation system for radwaste 'Support for preparing the PSAR and PEIAR for new licensing' Assessment of the radiological impact in an area of 50 km radius around Sergiev Posad Department. - The initial duration of this Project is 3 years, starting beginning of 2006. This paper describes the difficulties encountered to start and implement the Project and its status at the half of the planned time schedule. (authors)

  4. Software-based annunciator replacement: a tale of two projects

    International Nuclear Information System (INIS)

    Simmons, G.T.

    2015-01-01

    Annunciator upgrade projects are often included as parts of operating plant life extension projects as the systems are old and replacement parts are difficult to source. This paper contains case studies of the software-based annunciator replacement projects at the Westinghouse SNUPPS training simulator in Pennsylvania and the Axpo Beznau nuclear power plant in Switzerland. Software-based annunciator systems can offer a number of feature enhancements including improved readability and operator awareness, easy configuration, alarm suppression features, and alarm management at operator workstations. This paper provides an overview of each project and discusses advantages, challenges, and lessons learned from both annunciator-replacement projects. (author)

  5. Software-based annunciator replacement: a tale of two projects

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, G.T., E-mail: simmongt@westinghouse.com [Westinghouse Electric Company LLC, Cranberry Township, PA (United States)

    2015-07-01

    Annunciator upgrade projects are often included as parts of operating plant life extension projects as the systems are old and replacement parts are difficult to source. This paper contains case studies of the software-based annunciator replacement projects at the Westinghouse SNUPPS training simulator in Pennsylvania and the Axpo Beznau nuclear power plant in Switzerland. Software-based annunciator systems can offer a number of feature enhancements including improved readability and operator awareness, easy configuration, alarm suppression features, and alarm management at operator workstations. This paper provides an overview of each project and discusses advantages, challenges, and lessons learned from both annunciator-replacement projects. (author)

  6. ATLAS Detector Upgrade Prospects

    CERN Document Server

    Dobre, Monica; The ATLAS collaboration

    2016-01-01

    After the successful operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, the LHC is ramped up and successfully took data at the center-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The ultimate goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extens...

  7. ATLAS detector upgrade prospects

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00184940; The ATLAS collaboration

    2017-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC is ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred fb$^{-1}$ expected for LHC running to 3000 fb $^{-1}$ by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of ...

  8. Status of PF-ring commissioning after the reconstruction for the straight-sections upgrade

    International Nuclear Information System (INIS)

    Tanimoto, Yasunori; Miyauchi, Hiroshi; Honda, Tohru; Kobayashi, Yukinori

    2006-01-01

    The upgrade project of the straight sections at the PF-ring enables the reinforcement of insertion devices and their beamlines. As a main part of this project, a large-scale reconstruction of the storage ring was carried out from March to September in 2005. The lattice configuration was modified to create short straight sections of 1.4 m and to extend the existing straight sections. Optical functions of the short sections were optimized for short-gap mini-pole undulators as X-ray sources. The first mini-pole undulator SGU no.17 has been operated for a protein crystallography. A recommissioning of the ring was conducted for about one month, and user experiments were restarted on 18th October 2005 according to schedule. The recovery of the beam lifetime due to the process of the vacuum scrubbing has been favorably progressed. (author)

  9. Muon Physics at Run-I and its upgrade plan

    Directory of Open Access Journals (Sweden)

    Benekos Nektarios Chr.

    2015-01-01

    Full Text Available The Large Hadron Collider (LHC and its multi-purpose Detector, ATLAS, has been operated successfully at record centre-of-mass energies of 7 and TeV. After this successful LHC Run-1, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the data set from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2030. To cope with the corresponding rate increase, the ATLAS detector needs to be upgraded. The upgrade will proceed in two steps: Phase I in the LHC shutdown 2018/19 and Phase II in 2023-25. The largest of the ATLAS Phase-1 upgrades concerns the replacement of the first muon station of the highrapidity region, the so called New Small Wheel. This configuration copes with the highest rates expected in Phase II and considerably enhances the performance of the forward muon system by adding triggering functionality to the first muon station. Prospects for the ongoing and future data taking are presented. This article presents the main muon physics results from LHC Run-1 based on a total luminosity of 30 fb^-1. Prospects for the ongoing and future data taking are also presented. We will conclude with an update of the status of the project and the steps towards a complete operational system, ready to be installed in ATLAS in 2018/19.

  10. Safety of radiation sources and other radioactive materials in Jordan

    International Nuclear Information System (INIS)

    Majali, M.M.

    2001-01-01

    Since joining the IAEA Model Project for upgrading radiation protection infrastructure in countries of West Asia, Jordan has amended its radiation safety legislation. The Regulatory Authority is improving its inventory system for radiation sources and other radioactive materials and also its notification, registration, licensing, inspection and enforcement systems. It has established national provisions for the management of orphan sources after they have been found. The system for the control of the radiation sources and other radioactive materials entering the country has been improved by the Regulatory Authority. (author)

  11. Siemens tasks and activities during gradual upgrading

    International Nuclear Information System (INIS)

    Kuehne, B.

    2001-01-01

    The gradual upgrading of NPP V1 Bohunice constitutes the most extensive reconstruction project to be performed in an operational WWER plant to date. It constitutes a milestone in Siemens co-operation on projects for WWERs to date and is an encouraging example for the successful combination of western and eastern safety cultures. During the runtime of this project Siemens learnt very much about the 'complete function' as well as the details of this WWER plant type. In contrast the Slovakian partners really gained a much better understanding for the western approach to ensure safety, for the most modern safety technology, in particular for instrumentation and control, and last but not least or advanced project management. (author)

  12. Open Source and Proprietary Project Management Tools for SMEs.

    Directory of Open Access Journals (Sweden)

    Veronika Abramova

    2017-05-01

    Full Text Available The dimensional growth and increasing difficulty in project management promoted the development of different tools that serve to facilitate project management and track project schedule, resources and overall progress. These tools offer a variety of features, from task and time management, up to integrated CRM (Customer Relationship Management and ERP (Enterprise Resource Planning modules. Currently, a large number of project management software is available, to assist project team during the entire project lifecycle. We present the main differences between open source and proprietary project management tools and how those could be important for SMEs, describing the key features and how those can assist the project manager and the development team. In this paper, we analyse four open-source project management tools: OpenProject, ProjectLibre, Redmine, LibrePlan and four proprietary tools: Bitrix24, JIRA, Microsoft Project and Asana.

  13. Environmental impact assessment of oilfield upgrades in Bohai Sea

    Science.gov (United States)

    Chen, Ruihui; Xiong, Yanna; Li, Jiao; Li, Xianbo

    2018-02-01

    This paper designed 65 environmental monitoring sites to collect samples and analyze for better evaluating the environmental impact generated by cuttings, mud, produced water with oil and oil pollutions that produced during the upgrading in the Bohai Sea where the oil field 34-1 upgraded. Collecting samples include ocean water, marine life and sediments and test items involve PH, dissolved oxygen (DO), salinity, chemical oxygen demand (COD), phosphate, organic carbon, sulfide, inorganic nitrogen, petroleum, copper (Cu), lead (Pb), zinc (Zn), cadmium (Cd), total chromium (Cr), total mercury (Hg) and arsenic (As). Meanwhile sample sites collect and analyze the abundance and diversity of marine plants and elaborated the environmental impact caused by upgrading renovation project from the aspects of sea water, marine life and marine sediments. Through analysis and comparison we found that seawater quality conform the Ш seawater quality standards, the excessive rate of Cu is 10%, the average diversity index of marine life is 2.34 and evenness is 0.68. Influence range of marine sediments and pollutants of production is within 2.68km and basically has no serious impact in the surrounding sea area. It’s worth nothing that reconstruction project has the risk of oil spilling and protective measures must be prepared.

  14. Conceptual design of a three-pole wiggler for the APS upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abliz, M., E-mail: mabliz@aps.anl.gov; Grimmer, J., E-mail: grimmer@aps.anl.gov; Dejus, R.; Ramanathan, M., E-mail: mohan@aps.anl.gov [The Advanced Photon Source, Argonne National Laboratory, Argonne, IL 60439 (United States)

    2016-07-27

    The current design of the Advanced Photon Source Upgrade (APS-U) project is a multi-bend achromat (MBA) lattice, which incorporates three-pole wigglers as radiation sources for the bending magnet beamlines. They are located in the short section between the M4 dipole and Q8 quadrupole magnets. Due to space constraints, a hybrid permanent magnet design is necessary to provide the required magnetic field strength. A three-pole wiggler with a flat peak field profile along the beam axis was designed to enhance the photon flux and flatten the transverse flux density distributions. The magnetic peak field at the center pole reached 1.08 Tesla for a magnetic gap of 26 mm. The maximum power density, integrated over all vertical angles, is 3.1 W/mm{sup 2}, which is substantially higher than that of the existing bending magnets at the APS (0.86 W/mm{sup 2}). Detailed designs of the three-pole wiggler is presented, including calculated spectral-angular flux distributions.

  15. Project X and its connection to neutrino physics

    International Nuclear Information System (INIS)

    Harris, Deborah; Jansson, Andreas

    2008-01-01

    Project X is a new high intensity proton source that is being planned at Fermilab to usher in a new era of high intensity physics. The high intensity frontier can provide a wealth of new measurements--the most voracious consumer of protons is the long baseline neutrino program, but with the proton source upgrades being planned there are even more protons available than current neutrino targets can withstand. Those protons can provide a rich program on their own of muon physics and neutrino scattering physics that is complimentary to the long baseline program. In this article we discuss the physics motivation for Project X that comes from these short baseline experiments, and also the status of the design of this new source and what it will take to move forward on that design

  16. Implementation of U.S. Department of Energy physical protection upgrades in Lithuania and Uzbekistan

    International Nuclear Information System (INIS)

    Haase, M.; Romesberg, L.; Showalter, R.; Soo Hoo, M.S.; Corey, J.; Engling, E.

    1996-01-01

    Since 1994, the U.S. Department of Energy (DOE) has provided cooperative assistance to the non-nuclear weapons states of the Former Soviet Union. This effort, within DOE's program of Material Protection, Control, and Accounting (MPC ampersand A), identified the Institute of Nuclear Physics (INP) in Uzbekistan and the Ignalina Nuclear Power Plant (INPP) in Lithuania as sites for cooperative MPC ampersand A projects. The INP, located just outside of Tashkent, is the site of a 10-megawatt WWR-SM research reactor. This reactor is expected to remain operational as a major nuclear research and isotope production reactor for Central Asia. The INPP, located 100 kilometers northeast of the capital city of Vilnius, consists of two Russian-made RBMK reactors with a combined power output of 3,000 megawatts (electric). This power plant has been the subject of international safety and security concerns, which prompted DOE's cooperative assistance effort. This paper describes U.S. progress in a multi-national effort directed at implementing physical protection upgrades in Lithuania and Uzbekistan. The upgrades agreed upon between DOE and the INP and between DOE and the INPP have been designed to interface with upgrades being implemented by other donor countries. DOE/INPP upgrade projects include providing training on U.S. approaches to physical protection, access control through the main vehicle portal, a hardened central alarm station, and improved guard force communications. DOE/INP upgrade projects in Uzbekistan include an access control system, a hardened fresh fuel storage vault, an interior intrusion detection and assessment system, and an integrated alarm display and assessment system

  17. Source localization using recursively applied and projected (RAP) MUSIC

    Energy Technology Data Exchange (ETDEWEB)

    Mosher, J.C. [Los Alamos National Lab., NM (United States); Leahy, R.M. [Univ. of Southern California, Los Angeles, CA (United States). Signal and Image Processing Inst.

    1998-03-01

    A new method for source localization is described that is based on a modification of the well known multiple signal classification (MUSIC) algorithm. In classical MUSIC, the array manifold vector is projected onto an estimate of the signal subspace, but errors in the estimate can make location of multiple sources difficult. Recursively applied and projected (RAP) MUSIC uses each successively located source to form an intermediate array gain matrix, and projects both the array manifold and the signal subspace estimate into its orthogonal complement. The MUSIC projection is then performed in this reduced subspace. Using the metric of principal angles, the authors describe a general form of the RAP-MUSIC algorithm for the case of diversely polarized sources. Through a uniform linear array simulation, the authors demonstrate the improved Monte Carlo performance of RAP-MUSIC relative to MUSIC and two other sequential subspace methods, S and IES-MUSIC.

  18. Radiation hardness of two CMOS prototypes for the ATLAS HL-LHC upgrade project

    CERN Document Server

    Huffman, B T; Arndt, K; Bates, R; Benoit, M; Di Bello, F; Blue, A; Bortoletto, D; Buckland, M; Buttar, C; Caragiulo, P; Das, D; Dopke, J; Dragone, A; Ehrler, F; Fadeyev, V; Galloway, Z; Grabas, H; Gregor, I M; Grenier, P; Grillo, A; Hoeferkamp, M; Hommels, L B A; John, J; Kanisauskas, K; Kenney, C; Kramberger, J; Liang, Z; Mandic, I; Maneuski, D; Martinez-McKinney, F; McMahon, S; Meng, L; Mikuž, M; Muenstermann, D; Nickerson, R; Peric, I; Phillips, P; Plackett, R; Rubbo, F; Segal, J; Seidel, S; Seiden, A; Shipsey, I; Song, W; Stanitzki, M; Su, D; Tamma, C; Turchetta, R; Vigani, L; olk, J; Wang, R; Warren, M; Wilson, F; Worm, S; Xiu, Q; Zhang, J; Zhu, H

    2016-01-01

    The LHC luminosity upgrade, known as the High Luminosity LHC (HL-LHC), will require the replacement of the existing silicon strip tracker and the transistion radiation tracker. Although a baseline design for this tracker exists the ATLAS collaboration and other non-ATLAS groups are exploring the feasibility of using CMOS Monolithic Active Pixel Sensors (MAPS) which would be arranged in a strip-like fashion and would take advantage of the service and support structure already being developed for the upgrade. Two test devices made with theAMSH35 process (a High voltage or HV CMOS process) have been subjected to various radiation environments and have performed well. The results of these tests are presented in this paper.

  19. MD 400: LHC emittance growth in presence of an external source of noise during collision

    CERN Document Server

    Barranco Garcia, Javier; Pieloni, Tatiana; Tambasco, Claudia; Trad, Georges; Valuch, Daniel; Betz, Michael; Wendt, Manfred; Pojer, Mirko; Solfaroli Camillocci, Matteo; Salvachua Ferrando, Belen Maria; Fuchsberger, Kajetan; Albert, Markus; Qiang, Ji; CERN. Geneva. ATS Department

    2016-01-01

    The interplay between head-on beam-beam interaction and external sources of noise can be a significant source of emittance growth, especially when considering large beam-beam tune shifts as for the HL-LHC upgrade project. In this experiment the emittance growth of colliding bunches with different brightness and therefore different beam-beam parameters in the presence of an external white noise source with different amplitudes is measured for different gains of the transverse feedback.

  20. Performing instrumentation and controls upgrades

    International Nuclear Information System (INIS)

    Kessler, F. M.; Connell, T. J.; Ryan, M. P.

    1992-01-01

    I and C upgrades are comprised of a varying range of content, complexity, expansiveness, and criticality. There are common threads in all upgrades which can be simplified by the development of a long term I and C upgrade plan. The development of a such a plan can establish effective ground rules for upgrades, large and small. It can be the basis from which to begin an upgrade evaluation and the standard which is used to compare the degree of compliance of any upgrade regarding the plan or to define the differences from the plan and an individual upgrade. Primary motivation for I and C upgrades are obsolescence and unavailability of spare parts. Numerous other areas of consideration are also involved in an upgrade. Today's technology results in most upgrades largely or totally utilizing digital equipment. The use of digital equipment is fairly new in many I and C applications and requires an elaborate evaluation from functional, qualification, operational, and licensing perspectives as well as others. A well defined upgrade plan developed as a basis for I and C upgrades is a significant start to ensuring an effective upgrade process. Properly developed and implemented, the plan will support I and C upgrade efforts to ensure that the intricacies associated with such tasks eliminate the existing problems which require the upgrade to be performed. The upgrade plan also results in ensuring the maximum benefit from all perspectives of the plant enhancements being carried out and considered for future implementation. Instrumentation and controls aging and replacement are issues of growing importance due to the potential for significant impact on plant operation and efficiency. Obsolescence and unavailability of spare parts are major drivers towards evaluating the cost benefits of upgrading current equipment. In addition to these two primary factors, the advantages of utilizing digital equipment have also become of prime importance when evaluating instrumentation and

  1. Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements

    International Nuclear Information System (INIS)

    French, Sean B.; Johns-Hughes, Kathryn W.

    2011-01-01

    Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

  2. Securing budget for and implementing your significant simulator upgrade: The Fermi experience

    International Nuclear Information System (INIS)

    Crone, B.D.

    2006-01-01

    Detroit Edison has selected CAE to perform a total simulator upgrade (with the exception of the panel hardware and I/O system) of the Fermi 2 station simulator. The upgrade is intended to improve the performance of the simulator (and thus training effectiveness) while reducing associated operating costs by utilizing an industry standard operating platform, software applications, and off the shelf PC based computer hardware. Additionally, the upgrade is intended to provide the ability to conduct classroom presentations through the use of desktop simulators. Because the cost of a total upgrade is considerable, substantial work is necessary to convince site management that such an undertaking is necessary, can be performed efficiently, and that a return on investment is even possible. This effort was compounded by the lingering history of a previous simulator upgrade, which was completed considerably over-budget and beyond the intended Ready for Training date. As of this writing, the Fermi 2 Simulator Upgrade using CAE products is approximately 60% complete. This paper will describe the methods used to procure funding, as well as steps taken following funding approval to keep the project on track for successful completion. (author)

  3. Offsite source recovery project - ten years of sealed source recovery and disposal

    Energy Technology Data Exchange (ETDEWEB)

    Whitworth, Julia Rose [Los Alamos National Laboratory; Pearson, Mike [Los Alamos National Laboratory; Witkowski, Ioana [Los Alamos National Laboratory; Wald - Hopkins, Mark [Los Alamos National Laboratory; Cuthbertson, A [NNSA

    2010-01-01

    The Global Threat Reduction Initiative's (GTRI) Offsite Source Recovery Project (OSRP) has been recovering excess and unwanted radioactive sealed sources for ten years. In January 2009, GTRI announced that the project had recovered 20,000 sealed radioactive sources (this number has since increased to more than 23,000). This project grew out of early efforts at Los Alamos National Laboratory (LANL) to recover and disposition excess Plutonium-239 (Pu-239) sealed sources that were distributed in the 1960s and 1970s under the Atoms for Peace Program. Decades later, these sources began to exceed their special form certifications or fall out of regular use. As OSRP has collected and stored sealed sources, initially using 'No Path Forward' waste exemptions for storage within the Department of Energy (DOE) complex, it has consistently worked to create disposal pathways for the material it has recovered. The project was initially restricted to recovering sealed sources that would meet the definition of Greater-than-Class-C (GTCC) low-level radioactive waste, assisting DOE in meeting its obligations under the Low-level Radioactive Waste Policy Act Amendments (PL 99-240) to provide disposal for this type of waste. After being transferred from DOE-Environmental Management (EM) to the U.S. National Nuclear Security Administration (NNSA) to be part of GTRI, OSRP's mission was expanded to include not only material that would be classified as GTCC when it became waste, but also any other materials that might constitute a 'national security consideration.' It was recognized at the time that the GTCC category was a waste designation having to do with environmental consequence, rather than the threat posed by deliberate or accidental misuse. The project faces barriers to recovery in many areas, but disposal continues to be one of the more difficult to overcome. This paper discusses OSRP's disposal efforts over its 10-year history. For sources

  4. The Phase-2 ATLAS ITk Pixel Upgrade

    CERN Document Server

    Rossi, Leonardo Paolo; The ATLAS collaboration

    2018-01-01

    The upgrade of the ATLAS experiment for the operation at the High Luminosity Large Hadron Collider requires a new and more performant inner tracker, the ITk. The innermost part of this tracker will be built using silicon pixel detectors. This paper describes the ITk pixel project, which, after few years of design and test e ort, is now defined in detail.

  5. Bevalac injector final stage RF amplifier upgrades

    International Nuclear Information System (INIS)

    Howard, D.; Calvert, J.; Dwinell, R.; Lax, J.; Lindner, A.; Richter, R.; Ridgeway, W.

    1991-01-01

    With the assistance of the DOE In-house Energy Management Program, the Bevalac injector final stage RF amplifier systems have been successfully upgraded to reduce energy consumption and operating costs. This recently completed project removed the energy-inefficient plate voltage modulator circuits that were used in conjunction with the final stage RF amplifiers. Construction, design, and operating parameters are described in detail

  6. Redistribution of sewage-nitrogen in estuarine food webs following sewage treatment upgrades

    International Nuclear Information System (INIS)

    Pitt, Kylie A.; Connolly, Rod M.; Maxwell, Paul

    2009-01-01

    Stable nitrogen isotopes were used to assess the effects of wastewater treatment plant (WWTP) upgrades on the utilisation of sewage-N by estuarine biota in Moreton Bay, Australia. We measured δ 15 N of filamentous algae, mangrove leaves and shore crabs at the Brisbane and Logan Rivers before and after scheduled WWTP upgrades, and at two reference rivers where WWTPs had been upgraded >4 years previously. The total N discharged into Brisbane River decreased by >80% after the upgrades had occurred, but N loads remained similar at Logan River despite the upgrade. In Brisbane River, δ 15 N values of algae and crabs decreased and were comparable to the reference rivers within 1-2 years but no changes occurred at Logan River. The δ 15 N of mangrove leaves remained elevated in all rivers, indicating that sewage-N remained a major source to mangroves either from residual WWTP discharges or from N accumulated in the sediments over many years.

  7. Field Quality from Tolerance Stack-up In R&D Quadrupoles for the Advanced Photon Source Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Liu, J.; Jaski, M.; Dejus, R.; Doose, C.; Donnelly, A.; Downey, J.; Borland, M.; Jain, Animesh

    2016-10-01

    The Advanced Photon Source (APS) at Argonne National Laboratory (ANL) is considering upgrading the current double-bend, 7-GeV, 3rd generation storage ring to a 6-GeV, 4th generation storage ring with a Multibend Achromat (MBA) lattice. In this study, a novel method is proposed to determine fabrication and assembly tolerances through a combination of magnetic and mechanical tolerance analyses. Mechanical tolerance stackup analyses using Teamcenter Variation Analysis are carried out to determine the part and assembly level fabrication tolerances. Finite element analyses using OPERA are conducted to estimate the effect of fabrication and assembly errors on the magnetic field of a quadrupole magnet and to determine the allowable tolerances to achieve the desired magnetic performance. Finally, results of measurements in R&D quadrupole prototypes are compared with the analysis results.

  8. APS Storage Ring Monopulse RF BPM Upgrade

    Science.gov (United States)

    Lill, R.; Pietryla, A.; Norum, E.; Lenkszus, F.

    2004-11-01

    The Advanced Photon Source (APS) is a third-generation synchrotron light source in its ninth year of operation. The storage ring monopulse radio frequency (rf) beam position monitor (BPM) was designed to measure single-turn and multi-turn beam positions for operations and machine physics studies. Many of the components used in the original design are obsolete and costly to replace. In this paper we present a proposal to upgrade the monopulse rf BPMs in which the existing system hardware is repartitioned and the aging data acquisition system is replaced. By replacing only the data acquisition system, we will demonstrate a cost-effective approach to improved beam stability, reliability, and enhanced postmortem capabilities. An eight-channel ADC/digitizer VXI board with sampling rate of up to 105 MHz (per channel) and 14-bit resolution coupled with a field-programmable gate array and embedded central processing will provide the flexibility to revitalize this system for another decade of operation. We will discuss the upgrade system specifications, design, and prototype test results.

  9. Upgradation of automatic liquid scintillation counting system

    International Nuclear Information System (INIS)

    Bhattacharya, Sadhana; Behere, Anita; Sonalkar, S.Y.; Vaidya, P.P.

    2001-01-01

    This paper describes the upgradation of Microprocessor based Automatic Liquid Scintillation Counting systems (MLSC). This system was developed in 1980's and subsequently many systems were manufactured and supplied to Environment Survey labs at various Nuclear Power Plants. Recently this system has been upgraded to a more sophisticated one by using PC add-on hardware and developing Windows based software. The software implements more intuitive graphical user interface and also enhances the features making it comparable with commercially available systems. It implements data processing using full spectrum analysis as against channel ratio method adopted earlier, improving the accuracy of the results. Also it facilitates qualitative as well as quantitative analysis of the β-spectrum. It is possible to analyze a sample containing an unknown β-source. (author)

  10. The Exercise: An Exercise Generator Tool for the SOURCe Project

    Science.gov (United States)

    Kakoyianni-Doa, Fryni; Tziafa, Eleni; Naskos, Athanasios

    2016-01-01

    The Exercise, an Exercise generator in the SOURCe project, is a tool that complements the properties and functionalities of the SOURCe project, which includes the search engine for the Searchable Online French-Greek parallel corpus for the UniveRsity of Cyprus (SOURCe) (Kakoyianni-Doa & Tziafa, 2013), the PENCIL (an alignment tool)…

  11. Upgrading during difficult times

    International Nuclear Information System (INIS)

    Tiefenbach, K.

    1993-01-01

    The Co-op Upgrader is part of an integrated refinery and upgrader complex in Regina, Saskatchewan. The upgrader processes 50,000 bbl/d heavy sour crude oil, mostly Fosterton and dilute Lloydminster crude, via hydrogen addition and carbon rejection, desulfurization, demetallization, and denitrification to yield a synthetic crude blend. The synthetic crude is refined to produce gasoline and diesel fuel. Byproducts from the integrated operation include 100,000 tonnes/y of petroleum coke, 65,000 tonnes/y of sulfur, propane, butane, fuel oil, and metals (Ni and V) in the form of spent catalysts. Recent operational and economic challenges faced by the upgrader are reviewed. Technical challenges include operating the upgrader's high-temperature high-pressure heavy oil hydrotreating unit and distillate hydrogenation unit, removal and replacement of the desulfurization catalyst, waste management, and producing coke of sufficient quality. Economic challenges include the shrinking differential between light and heavy oil, higher prices for natural gas (the main raw material for hydrogen production for upgrading), seasonal changes in product specifications, and lower prices for sulfur and metal byproducts. The upgrader is also affected by interest rates since borrowing costs are the single largest expenditure after crude oil purchases. 4 figs

  12. Plant process computer system upgrades at the KSG simulator centre

    International Nuclear Information System (INIS)

    2006-01-01

    The human-machine interface (HMI) of a modern plant process computer system (PPC) differs significantly from that of older systems. Along with HMI changes, there are often improvements to system functionality such as alarm display and printing functions and transient data analysis capabilities. Therefore, the upgrade or replacement of a PPC in the reference plant will typically require an upgrade of the simulator (see Section 6.5.1 for additional information). Several options are available for this type of project including stimulation of a replica system,or emulation, or simulation of PPC functionality within the simulation environment. To simulate or emulate a PCC, detailed knowledge of hardware and software functionality is required. This is typically vendor proprietary information, which leads to licensing and other complications. One of the added benefits of stimulating the PPC system is that the simulator can be used as a test bed for functional testing (i.e. verification and validation) of the system prior to installation in the reference plant. Some of this testing may include validation of the process curve and system diagram displays. Over the past few years several German NPPs decided to modernize their plant process computer (PPC) systems. After the NPPs had selected the desired system to meet their requirements the question arose how to modernize the PPC systems on the corresponding simulators. Six German NPPs selected the same PPC system from the same vendor and it was desired to perform integral tests of the HMI on the simulators. In this case the vendor offered a stimulated variant of their system and it therefore made sense to choose that implementation method for upgrade of the corresponding simulators. The first simulator PPC modernization project can be considered as a prototype project for the follow-on projects. In general, from the simulator project execution perspective the implementation of several stimulated PPC systems of the same type

  13. The ATLAS multi-user upgrade and potential applications

    Energy Technology Data Exchange (ETDEWEB)

    Mustapha, B.; Nolen, J. A.; Savard, G.; Ostroumov, P. N.

    2017-12-01

    With the recent integration of the CARIBU-EBIS charge breeder into the ATLAS accelerator system to provide for more pure and efficient charge breeding of radioactive beams, a multi-user upgrade of the ATLAS facility is being proposed to serve multiple users simultaneously. ATLAS was the first superconducting ion linac in the world and is the US DOE low-energy Nuclear Physics National User Facility. The proposed upgrade will take advantage of the continuous-wave nature of ATLAS and the pulsed nature of the EBIS charge breeder in order to simultaneously accelerate two beams with very close mass-to-charge ratios; one stable from the existing ECR ion source and one radioactive from the newly commissioned EBIS charge breeder. In addition to enhancing the nuclear physics program, beam extraction at different points along the linac will open up the opportunity for other potential applications; for instance, material irradiation studies at ~ 1 MeV/u and isotope production at ~ 6 MeV/u or at the full ATLAS energy of ~ 15 MeV/u. The concept and proposed implementation of the ATLAS multi-user upgrade will be presented. Future plans to enhance the flexibility of this upgrade will also be presented.

  14. Sustainability in Open Source Software Commons: Lessons Learned from an Empirical Study of SourceForge Projects

    Directory of Open Access Journals (Sweden)

    Charles M. Schweik

    2013-01-01

    Full Text Available In this article, we summarize a five-year US National Science Foundation funded study designed to investigate the factors that lead some open source projects to ongoing collaborative success while many others become abandoned. Our primary interest was to conduct a study that was closely representative of the population of open source software projects in the world, rather than focus on the more-often studied, high-profile successful cases. After building a large database of projects (n=174,333 and implementing a major survey of open source developers (n=1403, we were able to conduct statistical analyses to investigate over forty theoretically-based testable hypotheses. Our data firmly support what we call the conventional theory of open source software, showing that projects start small, and, in successful cases, grow slightly larger in terms of team size. We describe the “virtuous circle” supporting conventional wisdom of open source collaboration that comes out of this analysis, and we discuss two other interesting findings related to developer motivations and how team members find each other. Each of these findings is related to the sustainability of these projects.

  15. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, Susila; Tang, Y.N.

    1994-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans. ((orig.))

  16. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans

  17. BNFL Magnox - Upgrades and enhancements

    International Nuclear Information System (INIS)

    Udbinac, M.J.

    2006-01-01

    In the past, generic models, restrictive budgets,and general shortages of resources have limited the scope of the UK's older Magnox simulators. Nevertheless, the simulators evolved slowly over time, becoming more like their reference plants, as resources became available. Three years ago, the Training and Development Branch of Magnox Electric plc took a giant leap, investing significant resources into the modernization of their training simulators. New hardware was built, including a new simulator room. The simulator software was ported from Unix running on outdated servers to new servers running Microsoft Windows NT. Perhaps most significantly, major model enhancements were made to key plant systems to significantly increase the likeness of each simulator to its reference plant. The upgrade to NT, the addition of state-of-the-art instructor stations, and some of the model enhancements were achieved with SimPort, an all-inclusive simulation package provided by DS and S. This paper will provide a more detailed view of the Magnox modular simulators, including how they are used and how they have benefited from the enhancements and upgrades implemented during the project. (author)

  18. A case study of intelligent compaction used in road upgrades

    CSIR Research Space (South Africa)

    Leyland, R

    2014-08-01

    Full Text Available to traditional testing methods. In a field study numerous different IC systems where used during construction of a number of experimental road sections in South Africa. These sections formed part of a road upgrade project typical of most road construction...

  19. Sourcing Team Behavior in Project-Based MNE's

    DEFF Research Database (Denmark)

    Hansen, Anders Peder Lysholm

    2014-01-01

    across the three cases was characterized by conflict between departments represented in the category teams. This resulted in unfortunate sourcing team behaviour and unaligned performance management, which in turn had a number of adverse effects. Further research on how to create a holistic and balanced......This paper presents and discusses a multiple case study of three cross-functional category teams responsible for sourcing critical components within multi-national, project-based enterprises. The study focused on behaviour and management of the sourcing teams and found that the sourcing process...... team perspective in the sourcing teams is suggested....

  20. The upgraded JRR-3 and future scope of its utilization

    International Nuclear Information System (INIS)

    Miyasaka, Yasuhiko; Umei, Hiroshi; Takahashi, Hidetake; Sakamoto, Masanobu

    1985-10-01

    At the time of start to construct the upgraded JRR-3, the present report describes general features on the upgraded JRR-3 and future scope of its utilization on the purpose of the mutual understanding with researchers who use the reactor and the utilization facilities. The materials edited in the report have been written by 28 reactor engineers and scientists in JAERI, and 35 scientists in universities. According to the reviewed subjects as shown below, it was confirmed that the upgraded JRR-3 would be extensively expected by much more fields. (1) Reactor and utilization facilities. 1. Plan and main features of the upgraded JRR-3, Reactor building 2. Irradiation facilities: Hydraulic rabbits, Pneumatic tubes, Rig Hot Cell, etc. 3. Neutron beam facilities: Horizontal tubes, Cold neutron source and Neutron guide tubes (2) Neutron beam experimental facilities. 1. Neutron diffractometer, neutron spectrometer, Small-angle neutron scattering, Neutron radiography, etc. (3) Recent trends. 1. Irradiation research of fuels and materials in research reactor 2. Activation analysis, Radioisotope, Neutron transmutation doping, etc. 3. Neutron scattering research. (author)

  1. Development of upgraded brown coal process

    Energy Technology Data Exchange (ETDEWEB)

    Komatsu, N.; Sugita, S.; Deguchi, T.; Shigehisa, T.; Makino, E. [Kobe Steel Ltd., Hyogo (Japan). Coal and Energy Project Department

    2004-07-01

    Half of the world's coal resources are so-called low rank coal (LRC) such as lignite, subbituminous coal. Utilization of such coal is limited due to low heat value and high propensity of spontaneous combustion. Since some of LRCs have advantages as clean coal, i.e. low ash and low sulfur content, LRC can be the excellent feedstock for power generation and metallurgy depending on the upgrading technology. The UBC (upgraded brown coal) process introduced here converts LRC to solid fuel with high heat value and less propensity of self-heating. Various world coals, such as Australian, Indonesian and USA LRC, were tested using the Autoclave and Bench Scale Unit, and the process application to LRC of wide range is proven. The R & D activities of the UBC process are introduced including a demonstration project with a 5 ton/day test plant in progress in Indonesia, expecting near future commercialisation in order to utilize abundant LRC of clean properties. 8 refs., 12 figs., 3 tabs.

  2. Work plan for upgrading the 241-A-701 compressed air system and motor control center. Revision 1

    International Nuclear Information System (INIS)

    Carpenter, K.E.

    1995-01-01

    This work plan will outline the responsibilities associated with the 241-A-701 Compressed Air System (CAS) and Motor Control Center (MCC) upgrades. All activities required to design, install, test, and operate the modified systems are addressed in this document. Upgrades Technical Support (UTS) of TWRS Engineering is responsible for the completion of all tasks associated with this upgrade. UTS will coordinate the upgrade activities, and ensure all tasks are successfully completed on or before the scheduled dates. The primary objective of the 241-A-701 Compressor and MCC Upgrade is to provide a reliable source of process and instrument compressed air to the A, AX, AY, and AZ tank farms

  3. Incidence, predictors, and procedural results of upgrade to resynchronization therapy: the RAFT upgrade substudy.

    Science.gov (United States)

    Essebag, Vidal; Joza, Jacqueline; Birnie, David H; Sapp, John L; Sterns, Laurence D; Philippon, Francois; Yee, Raymond; Crystal, Eugene; Kus, Teresa; Rinne, Claus; Healey, Jeffrey S; Sami, Magdi; Thibault, Bernard; Exner, Derek V; Coutu, Benoit; Simpson, Chris S; Wulffhart, Zaev; Yetisir, Elizabeth; Wells, George; Tang, Anthony S L

    2015-02-01

    The resynchronization-defibrillation for ambulatory heart failure trial (RAFT) study demonstrated that adding cardiac resynchronization therapy (CRT) in selected patients requiring de novo implantable cardiac defibrillators (ICD) reduced mortality as compared with ICD therapy alone, despite an increase in procedure-related adverse events. Data are lacking regarding the management of patients with ICD therapy who develop an indication for CRT upgrade. Participating RAFT centers provided data regarding de novo CRT-D (CRT with ICD) implant, upgrade to CRT-D during RAFT (study upgrade), and upgrade within 6 months after presentation of study results (substudy). Substudy centers enrolled 1346 (74.9%) patients in RAFT, including 644 de novo, 80 study upgrade, and 60 substudy CRT attempts. The success rate (initial plus repeat attempts) was 95.2% for de novo versus 96.3% for study upgrade and 90.0% for substudy CRT attempts (P=0.402). Acute complications occurred among 26.2% of de novo versus 18.8% of study upgrade and 3.4% of substudy CRT implantation attempts (PRAFT study and other trials. © 2014 American Heart Association, Inc.

  4. Construction and operation of the Spallation Neutron Source: Draft environmental impact statement. Volume 2

    International Nuclear Information System (INIS)

    1998-12-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation Neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulation ring and a second target. Volume 1 of this document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this EIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. This volume contains the following appendices: (A) SNS accident source terms for EIS input; (B) Reports on the selection of alternative sites for the SNS; (C) Letters of consultation on protected species and cultural resources; (D) Ecological resource survey reports and summaries; (E) Descriptions of ORNL research projects in the Walker Branch Watershed; (F) Atmospheric dispersion and dose calculations for normal and accident conditions; (G) Projected air quality modeling effects at NOAA's Walker Branch Monitoring Tower

  5. ELECTRON BEAM ION SOURCE PREINJECTOR PROJECT (EBIS) CONCEPTUAL DESIGN REPORT.

    Energy Technology Data Exchange (ETDEWEB)

    ALESSI, J.; BARTON, D.; BEEBE, E.; GASSNER, D.; ET AL.

    2005-02-28

    This report describes a new heavy ion pre-injector for the Relativistic Heavy Ion Collider (RHIC) based on a high charge state Electron Beam Ion Source (EBIS), a Radio Frequency Quadrupole (RFQ) accelerator, and a short Linac. The highly successful development of an EBIS at BNL now makes it possible to replace the present pre-injector that is based on an electrostatic Tandem with a reliable, low maintenance Linac-based pre-injector. Linac-based pre-injectors are presently used at most accelerator and collider facilities with the exception of RHIC, where the required gold beam intensities could only be met with a Tandem until the recent EBIS development. EBIS produces high charge state ions directly, eliminating the need for the two stripping foils presently used with the Tandem. Unstable stripping efficiencies of these foils are a significant source of luminosity degradation in RHIC. The high reliability and flexibility of the new Linac-based pre-injector will lead to increased integrated luminosity at RHIC and is an essential component for the long-term success of the RHIC facility. This new pre-injector, based on an EBIS, also has the potential for significant future intensity increases and can produce heavy ion beams of all species including uranium beams and, as part of a future upgrade, might also be used to produce polarized {sup 3}He beams. These capabilities will be critical to the future luminosity upgrades and electron-ion collisions in RHIC. The new RFQ and Linac that are used to accelerate beams from the EBIS to an energy sufficient for injection into the Booster are both very similar to existing devices already in operation at other facilities. Injection into the Booster will occur at the same location as the existing injection from the Tandem.

  6. Laser performance upgrade for precise ICF experiment in SG-Ⅲ laser facility

    Directory of Open Access Journals (Sweden)

    Wanguo Zheng

    2017-09-01

    Full Text Available The SG-Ⅲ laser facility (SG-Ⅲ is the largest laser driver for inertial confinement fusion (ICF researches in China, which has 48 beamlines and can deliver 180 kJ ultraviolet laser energy in 3 ns. In order to meet the requirements of precise physics experiments, some new functionalities need to be added to SG-Ⅲ and some intrinsic laser performances need upgrade. So at the end of SG-Ⅲ's engineering construction, the 2-year laser performance upgrade project started. This paper will introduce the newly added functionalities and the latest laser performance of SG-Ⅲ. With these function extensions and performance upgrade, SG-Ⅲ is now fully prepared for precise ICF experiments and solidly paves the way towards fusion ignition.

  7. Integrating HCI Specialists into Open Source Software Development Projects

    Science.gov (United States)

    Hedberg, Henrik; Iivari, Netta

    Typical open source software (OSS) development projects are organized around technically talented developers, whose communication is based on technical aspects and source code. Decision-making power is gained through proven competence and activity in the project, and non-technical end-user opinions are too many times neglected. In addition, also human-computer interaction (HCI) specialists have encountered difficulties in trying to participate in OSS projects, because there seems to be no clear authority and responsibility for them. In this paper, based on HCI and OSS literature, we introduce an extended OSS development project organization model that adds a new level of communication and roles for attending human aspects of software. The proposed model makes the existence of HCI specialists visible in the projects, and promotes interaction between developers and the HCI specialists in the course of a project.

  8. Proposal to upgrade the MIPP experiment

    Energy Technology Data Exchange (ETDEWEB)

    Isenhower, D.; Sadler, M.; Towell, R.; Watson, S. [Abilene Christian Univ., TX (United States); Peterson, R. J. [Univ. of Colorado, Boulder, CO (United States); Baker, W.; Carey, D.; Christian, D.; Demarteau, M.; Jensen, D.; Johnstone, C.; Meyer, H.; Raja, R.; Ronzhin, A.; Solomey, N.; Wester, W. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Gutbrod, H.; Peters, K. [GSI-Darmstadt (Germany); Feldman, G. [Harvard Univ., Cambridge, MA (United States); Torun, Y. [Illinois Inst. of Technology, Chicago, IL (United States); Messier, M. D.; Paley, J. [Indiana Univ., Bloomington, IN (United States)

    2006-09-01

    The upgraded MIPP physics results are needed for the support of NuMI projects, atmospheric cosmic ray and neutrino programs worldwide and will permit a systematic study of non-perturbative QCD interactions. The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and {approx} 20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost scheme of upgrading the MIPP data acquisition speed to 3000 Hz. This will also enable us to measure the medium energy numi target to be used for the NOvA/MINERvA experiments. We outline the capabilities of the upgraded MIPP detector to obtain high statistics particle production data on a number of nuclei that will help towards the understanding and simulation of hadronic showers in matter. Measurements of nitrogen cross sections will permit a better understanding of cosmic ray shower systematics in the atmosphere. In addition, we explore the possibilities of providing tagged neutral beams using the MIPP spectrometer that may be crucial for validating the Particle Flow Algorithm proposed for calorimeters for the International Linear Collider detectors. Lastly, we outline the physics potential of such a detector in understanding non-perturbative QCD processes.

  9. Performance of the advanced cold neutron source and optics upgrades at the NIST Research Reactor

    International Nuclear Information System (INIS)

    Williams, R.E.; Kopetka, P.; Cook, J.C.; Rowe, J.M.

    2003-01-01

    On March 6, 2002, the NIST Research Reactor resumed routine operation following a six-month shutdown for facility upgrades and maintenance. During the shutdown, the original liquid hydrogen cold neutron source was removed, and the advanced cold source was installed. An optical filter was installed on one of the neutron guides, NG-3, replacing a crystal filter for the 30-m SANS instrument and the guide used between the chopper disks of the Disk Chopper time-of-flight Spectrometer (DCS) installed on NG-4 has been recently reconfigured. Additional improvements in the neutron optics of various instruments are being made. The advanced liquid hydrogen cold neutron source performs as expected, nearly doubling the flux available to most instruments. The measured gains range from about 1.4 at 2 A, to over a factor of two at 15 A. Also as expected, the heat load in the new source increased to 1200 watts, but the previously existing refrigerator has easily accommodated the increase. With intensity gains of a factor of two in the important long wavelength region of the spectrum, the advanced cold source significantly enhances the measurement capability of the cold neutron scattering instrumentation at NIST. The optical filter on NG-3 is also very successful; the 30-m SANS has an additional gain of two at 17 A. A system of refracting lenses and prisms near the SANS sample position has made possible measurements at low Q (0.0005 A -1 ) that were previously not feasible. The DCS has also seen additional intensity gain factors in excess of two for the majority of experiments and at short neutron wavelengths the gains exceed three. In addition, two new triple axis spectrometers will feature double-focusing monochromators in order to exploit the full size of the available thermal and cold neutron beam tubes. The success of the advanced cold source and enhanced neutron optics contributed to the recognition of the NIST Center for Neutron Research as 'the premiere neutron scattering

  10. Upgrade of the CERN SPS Extraction Protection Elements TPS

    CERN Document Server

    Borburgh, Jan; Barnes, Michael; Baud, Cedric; Fraser, Matthew; Kain, Verena; Maciariello, Fausto; Steele, Genevieve; Velotti, Francesco

    2017-01-01

    In 2006 the protection devices upstream of the septa in both extraction channels of the CERN SPS to the LHC were installed. Since then, new beam parameters have been proposed for the SPS beam towards the LHC in the framework of the LIU project. The mechanical parameters and assumptions on which these protection devices presently have been based, need validation before the new upgraded versions can be designed and constructed. The paper describes the design assumptions for the present protection device and the testing program for the TPSG4 at HiRadMat to validate them. Finally the requirements and the options to upgrade both extraction protection elements in the SPS are described.

  11. Upgrade of the computer-based information systems on USNRC simulators

    International Nuclear Information System (INIS)

    Griffin, J.I.

    1998-01-01

    In late 1995, the U.S. Nuclear Regulatory Commission (USNRC) began a project to upgrade the computer-based information systems on its BWR/6 and BandW Simulators. The existing display generation hardware was very old and in need of replacement due to difficulty in obtaining spare parts and technical support. In addition, the display systems used currently each require a SEL 32/55 computer system, which is also obsolete, running the Real Time Monitor (RTM) operating system. An upgrade of the display hardware and display generation systems not only solves the problem of obsolescence of that equipment but also allows removal of the 32/55 systems. These computers are used only to support the existing display generation systems. Shortly after purchase of the replacement equipment, it was learned that the vendor was no longer going to support the methodology. Instead of implementing an unsupported concept, it was decided to implement the display systems upgrades using the Picasso-3 UIMS (User Interface Management System) and the purchased hardware. This paper describes the upgraded display systems for the BWR/6 and BandW Simulators, including the design concept, display development, hardware requirements, the simulator interface software, and problems encountered. (author)

  12. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  13. submitter Development of the readout for the IBL upgrade project of the ATLAS Pixel Detector

    CERN Document Server

    Krieger, Nina

    The LHC luminosity is upgraded in several phases until 2022. The resulting higher occupancy degrades the detector performance of the current Pixel Detector. To provide a good performance during the LHC luminosity upgrade, a fourth pixel layer is inserted into the existing ATLAS Pixel Detector. A new FE-I4 readout chip and a new data acquisition chain are required to cope with the higher track rate and the resulting increased bandwidth. Among others, this includes a new readout board: the IBL ROD. One component of this board is the DSP which creates commands for the FE-I4 chip and has to be upgraded as well. In this thesis, the first tests of the IBL ROD prototype are presented. A correct communication of the DSP to its external memory is verified. Moreover, the implementations for an IBL DSP code are described and tested. This includes the first configuration of the FE-I4 with an IBL ROD. In addition, a working communication with the Histogrammer SDRAM and the Input FIFO on the IBL ROD are demonstrated.

  14. Synchrotron radiation sources and condensers for projection x-ray lithography

    International Nuclear Information System (INIS)

    Murphy, J.B.; MacDowell, A.A.; White, D.L.; Wood, O.R. II

    1992-01-01

    The design requirements for a compact electron storage ring that could be used as a soft x-ray source for projection lithography are discussed. The design concepts of the x-ray optics that are required to collect and condition the radiation in divergence, uniformity and direction to properly illuminate the mask and the particular x-ray projection camera used are discussed. Preliminary designs for an entire soft x-ray projection lithography system using an electron storage ring as a soft X-ray source are presented. It is shown that by combining the existing technology of storage rings with large collection angle condensers, a powerful and reliable source of 130 Angstrom photons for production line projection x-ray lithography is possible

  15. Recent achievements of the ATLAS upgrade Planar Pixel Sensors R and D Project

    International Nuclear Information System (INIS)

    George, M

    2014-01-01

    After the foreseen upgrade of the LHC towards the HL-LHC, coming along with higher beam energies and increased peak luminosities, the experiments have to upgrade their detector systems to cope with the expected higher occupancies and radiation damages. In case of the ATLAS experiment a new Inner Tracker will be installed in this context. The ATLAS Planar Pixel Sensor R and D Project (PPS) is investigating the possibilities to cope with these new requirements, using planar pixel silicon sensors, working in a collaboration of 17 institutions and more than 80 scientists. Since the new Inner Tracker is supposed to have an active area on the order of 8 m 2 on the one side and has to withstand extreme irradiation on the other side, the PPS community is working on several approaches to reduce production costs, while increasing the radiation tolerance of the sensors. Another challenge is to produce sensors in such large quantities. During the production of the Insertable b-Layer (IBL) modules, the PPS community has proven to be able to produce a large scale production of planar silicon sensors with a high yield. For cost reduction reasons, it is desirable to produce larger sensors. There the PPS community is working on so called quad- and hex-modules, which have a size of four, respectively six FE-I4 readout chips. To cope with smaller radii and strict material budget requirements for the new pixel layers, developments towards sensors with small inactive areas are in the focus of research. Different production techniques, which even allow the production of sensors with active edges, have been investigated and the designs were qualified using lab and testbeam measurements. The short distance between the new innermost pixel layers and the interaction point, combined with the increase in luminosity, requires designs which are more radiation tolerant. Since charge collection on the one hand decreases with irradiation and on the other hand is not uniform within the pixel cells

  16. Preliminary safety analysis report for project 89-GEB-610 Plutonium Finishing Plant instrumentation upgrade. Revision 1

    International Nuclear Information System (INIS)

    Huber, T.E.

    1995-01-01

    This document consists of an analysis of the MICON system upgrade. This project shall install a Micon Co. distributed process monitor and control system with Sparc Sun workstation operator interfaces. The Sparc workstations are housed in consoles custom designed to human factors specifications. The distributed control system (DCS) shall have the installed capacity to monitor and control all related instruments and equipment presently connected to the panels in the PFP Power Control Room 321A as listed in the input/output list. This also includes all devices monitored and controlled by the 2736-ZB Allen Bradley programmable logic controller. The system has since assumed the control and monitoring responsibilities for Projects B- 680H ''Low Level Waste Treatment Facility'' and C-031H ''PFP Liquid Effluent Facilities''. Part of the new en's change area in Building 234-5ZA, Room 712, has been remodeled to house two consoles and one supervisor console. Local control units containing the microprocontrollers and the input/output interface circuit boards shall be wired to the instrumentation and controlled equipment. These units communicate with the Sparc workstations via a redundant data communications highway and shall be strategic, throughout the PFP facility. The DCS has already been purchased from Micon Co., located in Houston Texas, presently on site

  17. Upgrade of the Proton West secondary beamline

    International Nuclear Information System (INIS)

    Spiegel, L.

    1989-01-01

    As originally designed and operated, protons entering PW6 were steered by a series of EPB dipoles into a single interaction length beryllium target, some 43 feet from the enclosure wall. Ensuing secondary beams, either p + /π + or p - /π - , were collected by a string of quadrupoles following the target, steered westward, away from the Proton Center line, through PW6 and PW7, and ultimately focussed on experiment production targets located within the large PW8 hall. Around the Spring of 1988 it was decided to upgrade the existing Proton West secondary beamline to allow for transport of a primary proton beam, anticipated to be either 800 or 900 GeV/c, through PW8. This upgrade project, which is now nearing completion, was largely motivated by the then recent approval of E-771, a hadronic beauty production experiment located in PW8. E-771 represents the third in a series of experiments for the large-acceptance dimuon spectrometer presently located at the end of the Proton West beamline. This Technical Memo is a summary of the upgrade --- an explanation of the underlying strategy and a documentation of the final locations of the secondary beamline elements. 6 refs., 2 figs., 2 tabs

  18. Using Retrofit Nail Base Panels to Expand the Market for Wall Upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Del Bianco, M. [Home Innovation Research Lab., Upper Marlboro, MD (United States); Wiehagen, J. [Home Innovation Research Lab., Upper Marlboro, MD (United States)

    2016-02-01

    This project evaluated the effectiveness and affordability of integrating retrofit insulated panels into a re-siding project. The Partnership for Home Innovation (PHI) teamed with New York State Energy Research and Development Authority (NYSERDA), the Albany Housing Authority (AHA), and the New York State Weatherization Assistance Program (WAP) administered by Albany Community Action Partnership to demonstrate an energy retrofit and siding upgrade on a two-story, seven unit, multifamily building in Albany New York (CZ 5). The project focused on accomplishing three goals - doubling the existing wall thermal resistance (from approximately R-13 to a weighted average of R-27), reduction of building air leakage, and completion of the retrofit within a budget where the additional cost for upgrading wall's thermal resistance is equal to the cost of the standard re-siding effort (i.e., the total cost of the energy efficient re-siding scope of work is not more than double the cost of the standard re-siding effort). Lessons learned from the project strongly indicate that the retrofit panel technology can be installed using common installation practices and with minimal training. Other lessons learned include limitation on the use of standard air sealing materials during cold weather installations and the need to develop better installation guidance for trades working with the level of tolerances that may be present in the existing structure. This technology demonstration showed that exterior retrofit panels provide a viable and reasonable option for the siding trades to increase market opportunities and achieve synergistic benefits for aesthetic upgrades to a building's exterior.

  19. Participatory slum upgrading as a disjunctive process in Recife, Brazil

    NARCIS (Netherlands)

    Vries, de Pieter

    2016-01-01

    This article engages with the coproduction of urban space by focusing on a slum upgrading project in Recife, Brazil. It argues that the urban situation is essentially inconsistent, unpredictable and unstable. It documents the history of urban planning in Recife, paying special attention to the

  20. The D0 Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abachi, S.; D0 Collaboration

    1995-07-01

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  1. UPGRADE OF INSTRUMENTATION FOR PURDUE REACTOR PUR-1, PHASE 3

    International Nuclear Information System (INIS)

    Revankar, S. T.

    2004-01-01

    The major objective of this program is to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective one project on design and installation of interface cards for channel four detector was considered. This report is the final report and gives the efforts and progress achieved on these projects from August 2002 to July 2004

  2. Status of TMX upgrade diagnostics construction

    International Nuclear Information System (INIS)

    Hornady, R.S.; Davis, J.C.; Simonen, T.C.

    1981-01-01

    This report describes the status of the initial TMX Upgrade diagnostics and the state of development of additional diagnostics being prepared for later TMX Upgrade experiments. The initial diagnostic instrument set has been described in the TMX Upgrade Proposal. This set is required to get TMX Upgrade operational and to evaluate its initial performance. Additional diagnostic instruments are needed to then carry out the more detailed experiments outlined by the TMX Upgrade program milestones. The relation of these new measurements to the physics program is described in The TMX Upgrade Program Plan

  3. The silicon vertex locator for the LHCb upgrade

    CERN Document Server

    Head, Tim

    2014-01-01

    The upgrade of the LHCb experiment, planned for 2018, will transform the entire readout to a triggerless system being read out at 40 MHz. The upgraded silicon vertex detector (VELO) must be light weight, radiation hard, and compatible with LHC vacuum requirements. It must be capable of fast pattern recognition, fast track reconstruction and high precision vertexing. This challenge is being met with a new VELO design based on hybrid pixel detectors positioned to within 5 mm of the LHC colliding beams. The detector will be shielded from the beam by a View the MathML source~300μm thick aluminium foil. Evaporative CO2 coolant circulating in micro-channels embedded in a thin silicon substrate will be used for cooling.

  4. Slum Upgrading and Health Equity.

    Science.gov (United States)

    Corburn, Jason; Sverdlik, Alice

    2017-03-24

    Informal settlement upgrading is widely recognized for enhancing shelter and promoting economic development, yet its potential to improve health equity is usually overlooked. Almost one in seven people on the planet are expected to reside in urban informal settlements, or slums, by 2030. Slum upgrading is the process of delivering place-based environmental and social improvements to the urban poor, including land tenure, housing, infrastructure, employment, health services and political and social inclusion. The processes and products of slum upgrading can address multiple environmental determinants of health. This paper reviewed urban slum upgrading evaluations from cities across Asia, Africa and Latin America and found that few captured the multiple health benefits of upgrading. With the Sustainable Development Goals (SDGs) focused on improving well-being for billions of city-dwellers, slum upgrading should be viewed as a key strategy to promote health, equitable development and reduce climate change vulnerabilities. We conclude with suggestions for how slum upgrading might more explicitly capture its health benefits, such as through the use of health impact assessment (HIA) and adopting an urban health in all policies (HiAP) framework. Urban slum upgrading must be more explicitly designed, implemented and evaluated to capture its multiple global environmental health benefits.

  5. Upgrading the safety of VVER-440/V-230

    International Nuclear Information System (INIS)

    Kelm, P.; Wenk, W.

    1995-01-01

    Besides measures seeking to restore the status as laid down in the project design, especially backfitting measures must be mentioned which serve to ensure component and pipe integrity. Ensuring component integrity is a problem not only of RPV embrittlement, but also of failure prevention. This aspect was not always taken into account properly. Further activities in the field of component integrity will focus on backing the brittle fracture evaluation of the RPV; qualifying the leak-before-breack criterion for the main pipes and in areas with screwed connections; qualifying the program of in-service inspections. Several operators are currently in the process of drafting backfitting programs. The upgrading measures envisaged must be checked as to their balanced nature. In certain plants, the integrity of the RPV coud turn out to be the weak spot in upgrading measures. As a consquence, concepts seeking to achieve upgrading for long periods of time may differ from one location to the next and even between units. Extensive modifications in systems engineering and building structures generally must be evaluated against the expected improvement in safety of the whole plant. (orig.) [de

  6. Upgraded millimeter-wave interferometer for measuring the electron density during the beam extraction in the negative ion source

    Energy Technology Data Exchange (ETDEWEB)

    Tokuzawa, T., E-mail: tokuzawa@nifs.ac.jp; Kisaki, M.; Nagaoka, K.; Ito, Y.; Ikeda, K.; Nakano, H. [National Institute for Fusion Science, 322-6 Oroshi-cho, Toki 509-5292 (Japan); Tsumori, K.; Osakabe, M.; Takeiri, Y. [National Institute for Fusion Science, 322-6 Oroshi-cho, Toki 509-5292 (Japan); The Graduate University for Advanced Studies, 322-6 Oroshi-cho, Toki 509-5292 (Japan); Kaneko, O. [National Institutes of Natural Sciences, 4-3-13 Toranomon, Minato-ku, Tokyo 105-0001 (Japan)

    2016-11-15

    The upgraded millimeter-wave interferometer with the frequency of 70 GHz is installed on a large-scaled negative ion source. Measurable line-averaged electron density is from 2 × 10{sup 15} to 3 × 10{sup 18} m{sup −3} in front of the plasma grid. Several improvements such as the change to shorter wavelength probing with low noise, the installation of special ordered horn antenna, the signal modulation for a high accuracy digital phase detection, the insertion of insulator, and so on, are carried out for the measurement during the beam extraction by applying high voltage. The line-averaged electron density is successfully measured and it is found that it increases linearly with the arc power and drops suddenly at the beam extraction.

  7. Sustainability in Open Source Software Commons: Lessons Learned from an Empirical Study of SourceForge Projects

    OpenAIRE

    Charles M. Schweik

    2013-01-01

    In this article, we summarize a five-year US National Science Foundation funded study designed to investigate the factors that lead some open source projects to ongoing collaborative success while many others become abandoned. Our primary interest was to conduct a study that was closely representative of the population of open source software projects in the world, rather than focus on the more-often studied, high-profile successful cases. After building a large database of projects (n=174,33...

  8. Recent Upgrade of the Klystron Modulator at SLAC

    International Nuclear Information System (INIS)

    Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.

    2011-01-01

    The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 μS at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 μS at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

  9. 400 MeV upgrade for the Fermilab linac

    International Nuclear Information System (INIS)

    MacLachlan, J.A.

    1989-01-01

    Fermilab has plans for a comprehensive accelerator upgrade to open new possibilities for both the fixed target and collider experimental programs. An early step in this program is to increase the energy of the linac from 200 to 400 MeV by replacing the last four of its nine 201 MHz Alvarez tanks with twenty-eight 805 MHz side-coupled cavity chains operating at about 8 MV/m average axial field. The principal purpose is to reduce the incoherent spacecharge tuneshift at injection into the Booster which currently limits both the brightness of the beam, an important determinant of collider luminosity, and total intensity to produce both the antiprotons for the collider and the beams to fixed target experimental areas. Other consequences of higher Booster injection energy expected to contribute to some degree of higher intensity limits and improved operational characteristics include improved quality of the guide field at injection, reduced frequency swing for the rf systems, and smaller emittance for the injected beam. The linac upgrade project has moved from a 1986 study through a development project including structure models and numerical studies to a full-feature module prototyping starting this year

  10. Planned upgrade to the coaxial plasma source facility for high heat flux plasma flows relevant to tokamak disruption simulations

    International Nuclear Information System (INIS)

    Caress, R.W.; Mayo, R.M.; Carter, T.A.

    1995-01-01

    Plasma disruptions in tokamaks remain serious obstacles to the demonstration of economical fusion power. In disruption simulation experiments, some important effects have not been taken into account. Present disruption simulation experimental data do not include effects of the high magnetic fields expected near the PFCs in a tokamak major disruption. In addition, temporal and spatial scales are much too short in present simulation devices to be of direct relevance to tokamak disruptions. To address some of these inadequacies, an experimental program is planned at North Carolina State University employing an upgrade to the Coaxial Plasma Source (CPS-1) magnetized coaxial plasma gun facility. The advantages of the CPS-1 plasma source over present disruption simulation devices include the ability to irradiate large material samples at extremely high areal energy densities, and the ability to perform these material studies in the presence of a high magnetic field. Other tokamak disruption relevant features of CPS-1U include a high ion temperature, high electron temperature, and long pulse length

  11. NCSU PULSTAR reactor instrumentation upgrade. Final technical report, September 6, 1990--March 19, 1993

    International Nuclear Information System (INIS)

    Bilyj, S.J.; Perez, P.B.

    1993-01-01

    The Nuclear Reactor Program at North Carolina State University initiated an upgrade program at the NCSU PULSTAR Reactor in 1990. Twenty-year-old instrumentation is currently undergoing replacement with solid-state and current technology equipment. The financial assistance from the United States Department of Energy has been the primary source of support. This report provides the status of the first two phases of the upgrade program

  12. Urban upgrading for violence prevention in South Africa: Does it ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The Violence Prevention through Urban Upgrading (VPUU) project, funded jointly by the German Development Bank and the City of Cape Town in South Africa, is a prime example of an evidence-based intervention for violence prevention that was designed to address all urban violence determining factors. The VPUU ...

  13. Upgrading of TREAT experimental capabilities

    International Nuclear Information System (INIS)

    Dickerman, C.E.; Rose, D.; Bhattacharyya, S.K.

    1982-01-01

    The TREAT facility at the Argonne National Laboratory site in the Idaho National Engineering Laboratory is being upgraded to provide capabilities for fast-reactor-safety transient experiments not possible at any other experimental facility. Principal TREAT Upgrade (TU) goal is provision for 37-pin size experiments on energetics of core-disruptive accidents (CDA) in fast breeder reactor cores with moderate sodium void coefficients. this goal requires a significant enhancement of the capabilities of the TREAT facility, specifically including reactor control, hardened neutron spectrum incident on the test sample, and enlarged building. The upgraded facility will retain the capability for small-size experiments of the types currently being performed in TREAT. Reactor building and crane upgrading have been completed. TU schedules call for the components of the upgraded reactor system to be finished in 1984, including upgraded TREAT fuel and control system, and expanded coverage by the hodoscope fuel-motion diagnostics system

  14. Spin-orbit maps and electron spin dynamics for the luminosity upgrade project at HERA

    International Nuclear Information System (INIS)

    Berglund, G.Z.M.

    2001-09-01

    HERA is the high energy electron(positron)-proton collider at deutsches elektronen-synchrotron (DESY) in Hamburg. Following eight years of successful running, five of which were with a longitudinally spin polarized electron(positron) beam for the HERMES experiment, the rings have now been modified to increase the luminosity by a factor of about five and spin rotators have been installed for the H1 and ZEUS experiments. The modifications involve nonstandard configurations of overlapping magnetic fields and other aspects which have profound implications for the polarization. This thesis addresses the problem of calculating the polarization in the upgraded machine and the measures needed to maintain the polarization. A central topic is the construction of realistic spin-orbit transport maps for the regions of overlapping fields and their implementation in existing software. This is the first time that calculations with such fields have been possible. Using the upgraded software, calculations are presented for the polarization that can be expected in the upgraded machine and an analysis is made of the contributions to depolarization from the various parts of the machine. It is concluded that about 50% polarization should be possible. The key issues for tuning the machine are discussed. The last chapter deals with a separate topic, namely how to exploit a simple unitary model of spin motion to describe electron depolarization and thereby expose a misconception appearing in the literature. (orig.)

  15. Gas Permeation Processes in Biogas Upgrading: A Short Review

    Czech Academy of Sciences Publication Activity Database

    Kárászová, Magda; Sedláková, Zuzana; Izák, Pavel

    2015-01-01

    Roč. 69, č. 10 (2015), s. 1277-1283 ISSN 0366-6352 R&D Projects: GA MŠk(CZ) LD14094; GA MŠk LH14006; GA ČR GA14-12695S Institutional support: RVO:67985858 Keywords : biogas upgrading * memranes * gas permeation Subject RIV: CI - Industrial Chemistry, Chemical Engineering Impact factor: 1.326, year: 2015

  16. 1994 Activity Report, National Synchrotron Light Source. Annual report, October 1, 1993-September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Rothman, E.Z. [ed.

    1995-05-01

    This report is a summary of activities carried out at the National Synchrotron Light Source during 1994. It consists of sections which summarize the work carried out in differing scientific disciplines, meetings and workshops, operations experience of the facility, projects undertaken for upgrades, administrative reports, and collections of abstracts and publications generated from work done at the facility.

  17. 1994 Activity Report, National Synchrotron Light Source. Annual report, October 1, 1993-September 30, 1994

    International Nuclear Information System (INIS)

    Rothman, E.Z.

    1995-05-01

    This report is a summary of activities carried out at the National Synchrotron Light Source during 1994. It consists of sections which summarize the work carried out in differing scientific disciplines, meetings and workshops, operations experience of the facility, projects undertaken for upgrades, administrative reports, and collections of abstracts and publications generated from work done at the facility

  18. THE SPALLATION NEUTRON SOURCE PROJECT - PHYSICAL CHALLENGES.

    Energy Technology Data Exchange (ETDEWEB)

    WEI,J.

    2002-06-03

    The Spallation Neutron Source (SNS) is designed to reach an average proton beam power of 1.4 MW for pulsed neutron production. This paper summarizes design aspects and physical challenges to the project.

  19. A status report on the Advanced Neutron Source project

    International Nuclear Information System (INIS)

    West, C.D.

    1993-01-01

    The Advanced Neutron Source (ANS) will be a new laboratory for neutron research, centered around a 330 MW(f) research reactor cooled and reflected by heavy water and including extensive experiment systems and support facilities. The major components of the baseline design, occupying about 16 heetares, are a guide hall/research support area, containing most of the neutron beam experiment systems, shops and supporting laboratories; a 60 m diameter containment building housing the reactor and its pimary coolant system, and selected scientific research facilities; an operations support building with the majority of the remaining plant systems, an office/interface complex providing a carefully designed, user friendly entry point for access control; and several other major facilities including user housing, an electrical substation, a diesel generator building, a cryorefrigerator building, and heavy water cleanup and upgrade systems

  20. Repairing and Upgrading Your PC

    CERN Document Server

    Thompson, Robert

    2009-01-01

    Repairing and Upgrading Your PC delivers start-to-finish instructions, simple enough for even the most inexperienced PC owner, for troubleshooting, repairing, and upgrading your computer. Written by hardware experts Robert Bruce Thompson and Barbara Fritchman Thompson, this book covers it all: how to troubleshoot a troublesome PC, how to identify which components make sense for an upgrade, and how to tear it all down and put it back together. This book shows how to repair and upgrade all of your PC's essential components.

  1. CMS Phase II Upgrade Scope Document

    CERN Document Server

    Butler, J; Klute, M; Mans, J; Silvestris, L; on behalf of the CMS, Collaboration; CERN. Geneva. The LHC experiments Committee; LHCC

    2015-01-01

    The High-Luminosity LHC (HL-LHC) has been identified as the highest priority program in High Energy Physics by both the European Strategy Group and the US Particle Physics Project Prioritization Panel. To fulfil the full potential of this program, which includes the study of the nature of the Higgs boson, the investigation of the properties of any newly discovered particles in the upcoming LHC runs, and the extension of the mass reach for further discoveries, an integrated luminosity of 3000 fb-1 will have to be accumulated by the end of the program. In preparation for operation at the HL-LHC , CMS has documented the necessary upgrades and their expected costs in a Technical Proposal submitted to the CERN LHC Committee (LHCC) in mid-2015. The material presented in the current “Scope Document” provides additional information to assist the LHCC and the CERN Resource Review Board (RRB) in their review of the CMS upgrade. The document commences with a summary of the process followed to develop the scope of t...

  2. Upgrade and extension of the climate station at DTU Byg

    DEFF Research Database (Denmark)

    Andersen, Elsa; Dragsted, Janne; Kristensen, Troels V.

    In the period 2013-2014 the projectUpgrade and Extension of the Climate Station at DTU Byg” is carried out at DTU Byg. The aim of the project is to renew the hardware and the software for data acquisition and monitoring, exchange cables and cable connections in order to avoid interference...... of electrical noise from the surroundings and exchange worn out equipment. Further, the aim is to make measured data from the climate station easily available for the users....

  3. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Lee, Dong Young; Cha, Kyung Ho; Park, Won Man; Song, Soon Ja; Lee, Jung Woon; Oh, In Seok; Moon, Byung Sou; Ham, Chang Shik; Seh, Kyung Won; Joo, Young Chang; Lee, Eui Jin

    1999-12-01

    We developed techniques for upgrading nuclear power plant simulators that lost some function due to aging and obsolescence of parts. This project will provide a guidance for resolving the problems with aged simulators. We transplanted the simulation code operated in Macro-VAX II into the HP workstation with operating system version 10.20. If further research is proceeded, it will be possible to build simulator system on PCs. (author)

  4. Krsko NPP Quality Assurance Plan Application to Nuclear Safety Upgrade Projects (PCFV System and PAR System)

    International Nuclear Information System (INIS)

    Biscan, Romeo; Fifnja, Igor

    2014-01-01

    Nuklearna Elektrarna Krsko (NEK) has undertaken Nuclear Safety Upgrade Projects as a safety improvement driven by the lessons learned from the Fukushima-Daiichi Accident. Among other projects, new modification 1008-VA-L Passive Containment Filtered Vent (PCFV) System has been installed which acts as the last barrier minimizing the release of radioactive material into the environment in case of failure of all safety systems, and to insure containment integrity during beyond design basis accidents (BDBA). In addition, modification 1002-GH-L Severe Accident Hydrogen Control System (PAR) has been implemented to prevent and mitigate the consequences of explosive gas generation (hydrogen and carbon monoxide) in case of reactor core melting. To ensure containment integrity for all design basis accidents (DBA) and BDBA conditions, NEK has eliminated existing safety-related electrical recombiners, replaced them with two safety-related passive autocatalytic recombiners (PARs) and added 20 new PARs designed for the BDBA conditions. Krsko NPP Quality Assurance Plan has been applied to Nuclear Safety Upgrade Projects (PCFV System and PAR System) through the following activities: · Internal audit of modification process was performed. · Supplier audits were performed to evaluate QA program efficiency of the main design organization and engineering organizations. · Evaluation and approval of Suppliers were performed. · QA engineer was involved in the review and approval of 1008-VA-L and 1002-GH-L modification documentation (Conceptual Design Package, Design Modification Package, Installation Package, Field Design Change Request, Problem/Deficiency Report, and Final Documentation Package). · Purchasing documentation for modifications 1008-VA-L and 1002-GH-L (technical specifications, purchase orders) has been verified and approved by QA. · QA and QC engineers were involved in oversight of production and testing of the new 1008-VA-L and 1002-GH-L plant components.

  5. Climate adaptation of buildings through MOM- and upgrading - State of the art and research needs

    OpenAIRE

    Grynning, Steinar; Wærnes, Elisabeth Gaal; Kvande, Tore; Time, Berit

    2017-01-01

    This study presents an overview of research initiatives and projects addressing climate adaption in management operation and maintenance (MOM) and upgrade of existing buildings. The aim was to identify knowledge needs and research demand necessary for decision makers to address climate adaptation in their MOM and upgrade plans. Climate adaptation of buildings in the Norwegian climate very much concerns increased moisture robustness and risk reduction of moisture damages. Thus, a strong focus ...

  6. SYSTEM DESIGN AND PERFORMANCE FOR THE RECENT DIII-D NEUTRAL BEAM COMPUTER UPGRADE

    International Nuclear Information System (INIS)

    PHILLIPS, J.C; PENAFLOR, B.G; PHAM, N.Q; PIGLOWSKI, D.A.

    2004-03-01

    OAK-B135 This operating year marks an upgrade to the computer system charged with control and data acquisition for neutral beam injection system's heating at the DIII-D National Fusion Facility, funded by the US Department of Energy and operated by General Atomics (GA). This upgrade represents the third and latest major revision to a system which has been in service over twenty years. The first control and data acquisition computers were four 16 bit mini computers running a proprietary operating system. Each of the four controlled two ion source over dedicated CAMAC highway. In a 1995 upgrade, the system evolved to be two 32 bit Motorola mini-computers running a version of UNIX. Each computer controlled four ion sources with two CAMAC highways per CPU. This latest upgrade builds on this same logical organization, but makes significant advances in cost, maintainability, and the degree to which the system is open to future modification. The new control and data acquisition system is formed of two 2 GHz Intel Pentium 4 based PC's, running the LINUX operating system. Each PC drives two CAMAC serial highways using a combination of Kinetic Systems PCI standard CAMAC Hardware Drivers and a low-level software driver written in-house expressly for this device. This paper discusses the overall system design and implementation detail, describing actual operating experience for the initial six months of operation

  7. FRG sealed isotopic heat sources project (C-229) project management plan

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1997-01-01

    This Project Management Plan defines the cost, scope, schedule, organizational responsibilities, and work breakdown structure for the removal of the Federal Republic of Germany (FRG) Sealed Isotopic Heat Sources from the 324 Building and placed in interim storage at the Central Waste Complex (CWC)

  8. SAGE as a Source for Undergraduate Research Projects

    Science.gov (United States)

    Hutz, Benjamin

    2017-01-01

    This article examines the use of the computer algebra system SAGE for undergraduate student research projects. After reading this article, the reader should understand the benefits of using SAGE as a source of research projects and how to commence working with SAGE. The author proposes a tiered working group model to allow maximum benefit to the…

  9. Upgrading of the model to determine the economic and financial feasibility of a hotel

    OpenAIRE

    Neves, Beatriz

    2017-01-01

    This work project encompasses the upgrading of an already existing model to determine a hotel´s economic and financial feasibility, by adding some figures that give more information to the hotel managers and, therefore, can guide them in their strategic decisions. This upgrading was conducted to adapt the model to the changes that are going on in the hospitality industry such as, the growing importance of digital technology, that is changing the balance of power towards the consumer side and ...

  10. Silicon strip detectors for the ATLAS HL-LHC upgrade

    CERN Document Server

    Gonzalez Sevilla, S; The ATLAS collaboration

    2011-01-01

    The LHC upgrade is foreseen to increase the ATLAS design luminosity by a factor ten, implying the need to build a new tracker suited to the harsh HL-LHC conditions in terms of particle rates and radiation doses. In order to cope with the increase in pile-up backgrounds at the higher luminosity, an all silicon detector is being designed. To successfully face the increased radiation dose, a new generation of extremely radiation hard silicon detectors is being designed. We give an overview of the ATLAS tracker upgrade project, in particular focusing on the crucial innermost silicon strip layers. Results from a wide range of irradiated silicon detectors for the strip region of the future ATLAS tracker are presented. Layout concepts for lightweight yet mechanically very rigid detector modules with high service integration are shown.

  11. SRS control system upgrade requirements

    International Nuclear Information System (INIS)

    Hill, L.F.

    1998-01-01

    This document defines requirements for an upgrade of the Sodium Removal System (SRS) control system. The upgrade is being performed to solve a number of maintainability and operability issues. The upgraded system will provide the same functions, controls and interlocks as the present system, and in addition provide enhanced functionality in areas discussed in this document

  12. H-1 Upgrades (4BW/4BN) (H-1 Upgrades)

    Science.gov (United States)

    2015-12-01

    automatic blade fold of the new composite rotor blades, new performance matched transmissions, a new four-bladed tail rotor and drive system, upgraded...Upgrades December 2015 SAR March 18, 2016 10:59:17 UNCLASSIFIED 4 Col Steven Girard PMA-276 USMC Light/Attack Helicopter Program Executive Officer...attack helicopter is to provide rotary wing close air support, anti-armor, armed escort, armed/visual reconnaissance and fire support coordination

  13. The Earthquake‐Source Inversion Validation (SIV) Project

    KAUST Repository

    Mai, Paul Martin

    2016-04-27

    Finite-fault earthquake source inversions infer the (time-dependent) displacement on the rupture surface from geophysical data. The resulting earthquake source models document the complexity of the rupture process. However, multiple source models for the same earthquake, obtained by different research teams, often exhibit remarkable dissimilarities. To address the uncertainties in earthquake-source inversion methods and to understand strengths and weaknesses of the various approaches used, the Source Inversion Validation (SIV) project conducts a set of forward-modeling exercises and inversion benchmarks. In this article, we describe the SIV strategy, the initial benchmarks, and current SIV results. Furthermore, we apply statistical tools for quantitative waveform comparison and for investigating source-model (dis)similarities that enable us to rank the solutions, and to identify particularly promising source inversion approaches. All SIV exercises (with related data and descriptions) and statistical comparison tools are available via an online collaboration platform, and we encourage source modelers to use the SIV benchmarks for developing and testing new methods. We envision that the SIV efforts will lead to new developments for tackling the earthquake-source imaging problem.

  14. The Earthquake‐Source Inversion Validation (SIV) Project

    KAUST Repository

    Mai, Paul Martin; Schorlemmer, Danijel; Page, Morgan; Ampuero, Jean‐Paul; Asano, Kimiyuki; Causse, Mathieu; Custodio, Susana; Fan, Wenyuan; Festa, Gaetano; Galis, Martin; Gallovic, Frantisek; Imperatori, Walter; Kä ser, Martin; Malytskyy, Dmytro; Okuwaki, Ryo; Pollitz, Fred; Passone, Luca; Razafindrakoto, Hoby; Sekiguchi, Haruko; Song, Seok Goo; Somala, Surendra N.; Thingbaijam, Kiran Kumar; Twardzik, Cedric; van Driel, Martin; Vyas, Jagdish Chandra; Wang, Rongjiang; Yagi, Yuji; Zielke, Olaf

    2016-01-01

    Finite-fault earthquake source inversions infer the (time-dependent) displacement on the rupture surface from geophysical data. The resulting earthquake source models document the complexity of the rupture process. However, multiple source models for the same earthquake, obtained by different research teams, often exhibit remarkable dissimilarities. To address the uncertainties in earthquake-source inversion methods and to understand strengths and weaknesses of the various approaches used, the Source Inversion Validation (SIV) project conducts a set of forward-modeling exercises and inversion benchmarks. In this article, we describe the SIV strategy, the initial benchmarks, and current SIV results. Furthermore, we apply statistical tools for quantitative waveform comparison and for investigating source-model (dis)similarities that enable us to rank the solutions, and to identify particularly promising source inversion approaches. All SIV exercises (with related data and descriptions) and statistical comparison tools are available via an online collaboration platform, and we encourage source modelers to use the SIV benchmarks for developing and testing new methods. We envision that the SIV efforts will lead to new developments for tackling the earthquake-source imaging problem.

  15. EUB Decision 2006-112 : Suncor Energy Inc. application for expansion of an oil sands mine (North Steepbank mine extension) and a bitumen upgrading facility (Voyageur Upgrader) in the Fort McMurray area

    International Nuclear Information System (INIS)

    2006-01-01

    Suncor Energy Inc. filed 2 applications to the Alberta Energy and Utilities Board for their proposed North Steepbank Mine Extension and Voyageur Upgrading Facility in the Fort McMurray area. This document provided an outline to the board of the location of the proposed projects, along with technical details concerning sulphur recovery, coke gasification, and by-product storage and use. The applications shared a common environmental impact assessment report, which presented details of tailings management programs; environmental effects to air, terrestrial resources, surface water, and groundwater; potential health effects to human populations; and traditional land use and ecological knowledge of the lands in the areas of the proposed upgrades. The social and economic effects of the projects were considered by the board, as well as the efforts of Suncor to engage with public consultation processes. It was noted that the projects are expected to provide $7.1 billion in federal taxes paid over the life of the project, in addition to $3.6 billion in provincial taxes and a further $23 million in municipal taxes. Details of several interventions filed by various First Nations groups were presented. It was noted that the Oil Sands Environmental Coalition (OSEC) has filed interventions stating concerns over consultation practices; cumulative effects; environmental monitoring; water usage; reclamation policies; and socio-economic issues. Various other groups have expressed concerns over the impacts of rapid development in the region and the subsequent strains on public infrastructure, housing and community resources. While the project is expected to provide employment, the current labour shortage in the region means that further development will be a disadvantage rather than a benefit to the communities in the region. Although a number of conditions were placed on Suncor before full acceptance of the project could be given, the board concluded that the Voyageur project was

  16. LHC luminosity upgrade detector challenges

    CERN Multimedia

    CERN. Geneva; de Roeck, Albert; Bortoletto, Daniela; Wigmans, Richard; Riegler, Werner; Smith, Wesley H

    2006-01-01

    LHC luminosity upgrade: detector challenges The upgrade of the LHC machine towards higher luminosity (1035 cm -2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: • Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) • Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector developments (lectures 2-4) • Electronics, trigger and data acquisition challenges (lecture 5) Note: the much more ambitious LHC energy upgrade will not be covered

  17. The JET PCU project: An international plasma control project

    International Nuclear Information System (INIS)

    Sartori, F.; Crisanti, F.; Albanese, R.; Ambrosino, G.; Toigo, V.; Hay, J.; Lomas, P.; Rimini, F.; Shaw, S.R.; Luchetta, A.; Sousa, J.; Portone, A.; Bonicelli, T.; Ariola, M.; Artaserse, G.; Bigi, M.; Card, P.; Cavinato, M.; De Tommasi, G.; Gaio, E.

    2008-01-01

    This paper describes the new JET enhancement project 'Plasma Control Upgrade' (PCU). Initially aimed at an overhaul of JET plasma control capabilities it was eventually focused on improving the vertical stabilisation (VS) system ability to recover from large ELM (edge localised mode) perturbations. The paper describes the results of the first two years where the activity was aimed principally at researching a solution that could be implemented within the timing and budget constraints. A very important task was that of improving the modelling of JET plasma, iron core and passive structures. Using dedicated experiments, the models were progressively refined until it was possible not just to explain the experimental data but predict the VS system behaviour. At the same time the project team studied the best options for power supply (PS) and control system upgrades and evaluated whether a change of turns in the stabilisation coil was desirable and possible. A new fast radial field power supply is now being ordered and the VS control system is being upgraded

  18. The ISOL exotic beam facility at LNS: the EXCYT project

    International Nuclear Information System (INIS)

    Ciavola, G.; Calabretta, L.; Cuttone, G.; Di Bartolo, G.; Finocchiaro, P.; Gammino, S.; Gu, M.; Migneco, E.; Raia, G.; Rifuggiato, D.; Rovelli, A.; Vinciguerra, D.; Qin, J.; Wollnik, H.

    1997-01-01

    The aim of the EXCYT project (exotics with cyclotron and tandem) is the development of a facility for producing and accelerating exotic beams from 0.2 up to 8 MeV/amu. EXCYT is based on the ''two accelerators'' method. A K=800 superconducting cyclotron, axially injected by the ECR ion source SERSE, will deliver the primary beam. Such a beam will produce the required nuclear species in a modified ISOLDE type target-source complex. When required, a 15 MV tandem Van der Graaff will accelerate the secondary beams. Both accelerators are existing and operational at Laboratorio Nazionale del Sud. Concerning the status of the project, progress has been made in most of the key issues of the project, like the construction of SERSE, cyclotron upgrading, modification of the existing building, high resolution mass separator, and diagnostic equipment for low energy, low intensity beams. (orig.)

  19. The ISOL exotic beam facility at LNS: the EXCYT project

    Energy Technology Data Exchange (ETDEWEB)

    Ciavola, G.; Calabretta, L.; Cuttone, G.; Di Bartolo, G.; Finocchiaro, P.; Gammino, S.; Gu, M.; Migneco, E.; Raia, G.; Rifuggiato, D.; Rovelli, A.; Vinciguerra, D. [Istituto Nazionale di Fisica Nucleare, Catania (Italy); Qin, J. [Institute of Atomic Energy, Beijing (China); Wollnik, H. [Giessen Univ. (Germany)

    1997-04-01

    The aim of the EXCYT project (exotics with cyclotron and tandem) is the development of a facility for producing and accelerating exotic beams from 0.2 up to 8 MeV/amu. EXCYT is based on the ``two accelerators`` method. A K=800 superconducting cyclotron, axially injected by the ECR ion source SERSE, will deliver the primary beam. Such a beam will produce the required nuclear species in a modified ISOLDE type target-source complex. When required, a 15 MV tandem Van der Graaff will accelerate the secondary beams. Both accelerators are existing and operational at Laboratorio Nazionale del Sud. Concerning the status of the project, progress has been made in most of the key issues of the project, like the construction of SERSE, cyclotron upgrading, modification of the existing building, high resolution mass separator, and diagnostic equipment for low energy, low intensity beams. (orig.). 8 refs.

  20. The CMS Data Acquisition - Architectures for the Phase-2 Upgrade

    CERN Document Server

    Andre, Jean-Marc Olivier; Branson, James; Brummer, Philipp Maximilian; Chaze, Olivier; Cittolin, Sergio; Contescu, Cristian; Craigs, Benjamin Gordon; Darlea, Georgiana Lavinia; Deldicque, Christian; Demiragli, Zeynep; Dobson, Marc; Doualot, Nicolas; Erhan, Samim; Fulcher, Jonathan F; Gigi, Dominique; Michail Gladki; Glege, Frank; Gomez Ceballos, Guillelmo; Hegeman, Jeroen Guido; Holzner, Andre Georg; Janulis, Mindaugas; Jimenez Estupinan, Raul; Masetti, Lorenzo; Meijers, Franciscus; Meschi, Emilio; Mommsen, Remigius; Morovic, Srecko; O'Dell, Vivian; Orsini, Luciano; Paus, Christoph Maria Ernst; Petrova, Petia; Pieri, Marco; Racz, Attila; Reis, Thomas; Sakulin, Hannes; Schwick, Christoph; Simelevicius, Dainius; Zejdl, Petr

    2017-01-01

    The upgraded High Luminosity LHC, after the third Long Shutdown (LS3), will provide an instantaneous luminosity of $7.5\\times10^{34}$ cm$^{-2} s^{-1}$ (levelled), at the price of extreme pileup of up to 200 interactions per crossing. In LS3, the CMS Detector will also undergo a major upgrade to prepare for the phase-2 of the LHC physics program, starting around 2025. The upgraded detector will be read out at an unprecedented data rate of up to 50 Tb/s and an event rate of 750 kHz. Complete events will be analysed by software algorithms running on standard processing nodes, and selected events will be stored permanently at a rate of up to 10 kHz for offline processing and analysis. In this paper we discuss the baseline design of the DAQ and HLT systems for the phase-2, taking into account the projected evolution of high speed network fabrics for event building and distribution, and the anticipated performance of general purpose CPU. Implications on hardware and infrastructure requirements for the DAQ "data cen...

  1. Fire protection upgrading of four Russian 440/230 VVER units

    International Nuclear Information System (INIS)

    Corsini, G.; Yelfimov, S.

    1995-01-01

    The main goal of TACIS 3.6 a project funded by the Commission of the European Communities (CEC), was the front-end engineering for upgrading the Fire Protection System (FPS) of the safety-related equipment of Novovoronezh, Units 3 and 4, and Kola, Units 1 and 2, VVER 440/230 nuclear power plants. As a first step, all the safety-related equipment had to be identified, evaluation criteria had to be established and the existing FPS reviewed against the criteria. In the second step, the selection of the upgrading measures, depending on feasibility and cost estimate, has been accomplished, room by room. The third step, carried out on schedule and completed end July 95, has been essentially the preparation of the Technical Specifications for procurement of the needed equipment including remaining detail engineering. The Russian sub-contactor Atom Energo Project (AEP), who have been the designers of these older NPP s, have done the work with the Italian Ansaldo as the consultants of their Russian colleagues. Practical aspects of the engineering work are discussed and examples of improvements selected for retrofitting described. (author)

  2. The LHCb Muon Upgrade

    CERN Multimedia

    Cardini, A

    2013-01-01

    The LHCb collaboration is currently working on the upgrade of the experiment to allow, after 2018, an efficient data collection while running at an instantaneous luminosity of 2x10$^{33}$/cm$^{-2}$s$^{-1}$. The upgrade will allow 40 MHz detector readout, and events will be selected by means of a very flexible software-based trigger. The muon system will be upgraded in two phases. In the first phase, the off-detector readout electronics will be redesigned to allow complete event readout at 40 MHz. Also, part of the channel logical-ORs, used to reduce the total readout channel count, will be removed to reduce dead-time in critical regions. In a second phase, higher-granularity detectors will replace the ones installed in highly irradiated regions, to guarantee efficient muon system performances in the upgrade data taking conditions.

  3. A scalable and continuous-upgradable optical wireless and wired convergent access network.

    Science.gov (United States)

    Sung, J Y; Cheng, K T; Chow, C W; Yeh, C H; Pan, C-L

    2014-06-02

    In this work, a scalable and continuous upgradable convergent optical access network is proposed. By using a multi-wavelength coherent comb source and a programmable waveshaper at the central office (CO), optical millimeter-wave (mm-wave) signals of different frequencies (from baseband to > 100 GHz) can be generated. Hence, it provides a scalable and continuous upgradable solution for end-user who needs 60 GHz wireless services now and > 100 GHz wireless services in the future. During the upgrade, user only needs to upgrade their optical networking unit (ONU). A programmable waveshaper is used to select the suitable optical tones with wavelength separation equals to the desired mm-wave frequency; while the CO remains intact. The centralized characteristics of the proposed system can easily add any new service and end-user. The centralized control of the wavelength makes the system more stable. Wired data rate of 17.45 Gb/s and w-band wireless data rate up to 3.36 Gb/s were demonstrated after transmission over 40 km of single-mode fiber (SMF).

  4. Directory of financing sources for foreign energy projects

    Energy Technology Data Exchange (ETDEWEB)

    La Ferla, L. [La Ferla Associates, Washington, DC (United States)

    1995-09-01

    The Office of National Security Policy has produced this Directory of Financing Sources for Foreign Energy Projects. The Directory reviews programs that offer financing from US government agencies, multilateral organizations, public, private, and quasi-private investment funds, and local commercial and state development banks. The main US government agencies covered are the US Agency for International Development (USAID), the Export-Import Bank of the US (EXIM Bank), Overseas Private Investment Corporation (OPIC), US Department of Energy, US Department of Defense, and the US Trade and Development Agency (TDA). Other US Government Sources includes market funds that have been in part capitalized using US government agency funds. Multilateral organizations include the World Bank, International Finance Corporation (IFC), Asian Development Bank (ADB), European Bank for Reconstruction and Development (EBRD), and various organizations of the United Nations. The Directory lists available public, private, and quasi-private sources of financing in key emerging markets in the Newly Independent States and other developing countries of strategic interest to the US Department of Energy. The sources of financing listed in this directory should be considered indicative rather than inclusive of all potential sources of financing. Initial focus is on the Russian Federation, Ukraine, india, China, and Pakistan. Separate self-contained sections have been developed for each of the countries to enable the user to readily access market-specific information and to support country-specific Departmental initiatives. For each country, the directory is organized to follow the project life cycle--from prefeasibility, feasibility, project finance, cofinancing, and trade finance, through to technical assistance and training. Programs on investment and export insurance are excluded.

  5. Upgrade of the radio frequency quadrupole cooler and buncher for the HIE-ISOLDE project

    CERN Document Server

    Babcock, Carla

    2013-01-01

    The upgrade to the ISOLDE facility, HIE-ISOLDE, will include an upgrade to the RFQCB (radio frequency quadrupole cooler and buncher), the focus of which will be fixing the problems of alignment with the current machine, improving the integrity of the vacuum system, stabilizing the internal gas pressure, and the changes associated with a new position. The beam passage inside the RFQCB has been simulated with an independent code to highlight the importance of the internal gas pressure, to motivate design changes in the new RFQCB and to explain ways to improve the performance of the current machine. The suspected misalignment of ISCOOL has been quantified, and, using a simulation of ions passing through the external injection electrodes, the effect of the misalignment on machine acceptance has been detailed. Plans for the future RFQCB test stand and HIE-ISOLDE installation have been outlined. (C) 2013 Elsevier B.V. All rights reserved.

  6. Paloma co-op rehabilitation case study examining the challenges to energy upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Legge, C.; Schwartz, J. [JRS Enginerring LTd., Burnaby, (Canada)

    2010-07-01

    Paloma Cooperative consists of two wood-frame multi-unit residential buildings located in the Commercial Drive area of Vancouver, British Columbia. In 2006, investigations showed that the balconies were severely deteriorated due to water ingress. The complex was deemed to have suffered from a premature building failure. A complete building envelope remediation was necessary. This paper presented the challenges of incorporating energy efficient and sustainable design upgrades during a rehabilitation project, using the Paloma Cooperative as a case study. The various design options, the technical limitations, the financial analysis, the modelling assumptions and the involvement of third party lenders were presented. Initial air-leakage rates were measured and an energy modeling was completed using RETScreen software. Three scenarios were modeled to determine what effect different energy upgrades would have on the energy savings. This paper showed that cost was the biggest challenge faced by the Paloma Cooperative energy upgrade.

  7. Setting priorities for safeguards upgrades

    International Nuclear Information System (INIS)

    Al-Ayat, R.A.; Judd, B.R.; Patenaude, C.J.; Sicherman, A.

    1987-01-01

    This paper describes an analytic approach and a computer program for setting priorities among safeguards upgrades. The approach provides safeguards decision makers with a systematic method for allocating their limited upgrade resources. The priorities are set based on the upgrades cost and their contribution to safeguards effectiveness. Safeguards effectiveness is measured by the probability of defeat for a spectrum of potential insider and outsider adversaries. The computer program, MI$ER, can be used alone or as a companion to ET and SAVI, programs designed to evaluate safeguards effectiveness against insider and outsider threats, respectively. Setting the priority required judgments about the relative importance (threat likelihoods and consequences) of insider and outsider threats. Although these judgments are inherently subjective, MI$ER can analyze the sensitivity of the upgrade priorities to these weights and determine whether or not they are critical to the priority ranking. MI$ER produces tabular and graphical results for comparing benefits and identifying the most cost-effective upgrades for a given expenditure. This framework provides decision makers with an explicit and consistent analysis to support their upgrades decisions and to allocate the safeguards resources in a cost-effective manner

  8. The Earthquake‐Source Inversion Validation (SIV) Project

    Science.gov (United States)

    Mai, P. Martin; Schorlemmer, Danijel; Page, Morgan T.; Ampuero, Jean-Paul; Asano, Kimiyuki; Causse, Mathieu; Custodio, Susana; Fan, Wenyuan; Festa, Gaetano; Galis, Martin; Gallovic, Frantisek; Imperatori, Walter; Käser, Martin; Malytskyy, Dmytro; Okuwaki, Ryo; Pollitz, Fred; Passone, Luca; Razafindrakoto, Hoby N. T.; Sekiguchi, Haruko; Song, Seok Goo; Somala, Surendra N.; Thingbaijam, Kiran K. S.; Twardzik, Cedric; van Driel, Martin; Vyas, Jagdish C.; Wang, Rongjiang; Yagi, Yuji; Zielke, Olaf

    2016-01-01

    Finite‐fault earthquake source inversions infer the (time‐dependent) displacement on the rupture surface from geophysical data. The resulting earthquake source models document the complexity of the rupture process. However, multiple source models for the same earthquake, obtained by different research teams, often exhibit remarkable dissimilarities. To address the uncertainties in earthquake‐source inversion methods and to understand strengths and weaknesses of the various approaches used, the Source Inversion Validation (SIV) project conducts a set of forward‐modeling exercises and inversion benchmarks. In this article, we describe the SIV strategy, the initial benchmarks, and current SIV results. Furthermore, we apply statistical tools for quantitative waveform comparison and for investigating source‐model (dis)similarities that enable us to rank the solutions, and to identify particularly promising source inversion approaches. All SIV exercises (with related data and descriptions) and statistical comparison tools are available via an online collaboration platform, and we encourage source modelers to use the SIV benchmarks for developing and testing new methods. We envision that the SIV efforts will lead to new developments for tackling the earthquake‐source imaging problem.

  9. The CMS Pixel Detector Upgrade and R\\&D for the High Luminosity LHC

    CERN Document Server

    Viliani, Lorenzo

    2017-01-01

    The High Luminosity Large Hadron Collider (HL-LHC) at CERN is expected to collide protons at a centre-of-mass energy of 14\\,TeV and to reach an unprecedented peak instantaneous luminosity of $5 \\times 10^{34}\\,{\\rm cm}^{-2} {\\rm s}^{-1}$ with an average number of pileup events of 140. This will allow the ATLAS and CMS experiments to collect integrated luminosities of up to $3000\\,{\\rm fb}^{-1}$ during the project lifetime. To cope with this extreme scenario the CMS detector will be substantially upgraded before starting the HL-LHC, a plan known as CMS Phase-2 Upgrade. In the upgrade the entire CMS silicon pixel detector will be replaced and the new detector will feature increased radiation hardness, higher granularity and capability to handle higher data rate and longer trigger latency. In this report the Phase-2 Upgrade of the CMS silicon pixel detector will be reviewed, focusing on the features of the detector layout and on the development of new pixel devices.

  10. MAPS development for the ALICE ITS upgrade

    Science.gov (United States)

    Yang, P.; Aglieri, G.; Cavicchioli, C.; Chalmet, P. L.; Chanlek, N.; Collu, A.; Gao, C.; Hillemanns, H.; Junique, A.; Kofarago, M.; Keil, M.; Kugathasan, T.; Kim, D.; Kim, J.; Lattuca, A.; Marin Tobon, C. A.; Marras, D.; Mager, M.; Martinengo, P.; Mazza, G.; Mugnier, H.; Musa, L.; Puggioni, C.; Rousset, J.; Reidt, F.; Riedler, P.; Snoeys, W.; Siddhanta, S.; Usai, G.; van Hoorne, J. W.; Yi, J.

    2015-03-01

    Monolithic Active Pixel Sensors (MAPS) offer the possibility to build pixel detectors and tracking layers with high spatial resolution and low material budget in commercial CMOS processes. Significant progress has been made in the field of MAPS in recent years, and they are now considered for the upgrades of the LHC experiments. This contribution will focus on MAPS detectors developed for the ALICE Inner Tracking System (ITS) upgrade and manufactured in the TowerJazz 180 nm CMOS imaging sensor process on wafers with a high resistivity epitaxial layer. Several sensor chip prototypes have been developed and produced to optimise both charge collection and readout circuitry. The chips have been characterised using electrical measurements, radioactive sources and particle beams. The tests indicate that the sensors satisfy the ALICE requirements and first prototypes with the final size of 1.5 × 3 cm2 have been produced in the first half of 2014. This contribution summarises the characterisation measurements and presents first results from the full-scale chips.

  11. Upgrade of the NCSU PULSTAR instrumentation power channels. Final technical report, September 1, 1992 - August 31, 1994

    International Nuclear Information System (INIS)

    Perez, P.B.

    1998-01-01

    The Nuclear Reactor Program at North Carolina State University initiated an upgrade program at the NCSU PULSTAR Reactor in 1990. The originally supplied instrumentation has been replaced with solid-state and current technology equipment. The financial assistance from the US Department of Energy has been the primary source of support. This is the final report for the Instrumentation Upgrade

  12. South Ukraine NPP: Safety improvements through Plant Computer upgrade

    International Nuclear Information System (INIS)

    Brenman, O.; Chernyshov, M. A.; Denning, R. S.; Kolesov, S. A.; Balakan, H. H.; Bilyk, B. I.; Kuznetsov, V. I.; Trosman, G.

    2006-01-01

    This paper summarizes some results of the Plant Computer upgrade at the Units 2 and 3 of South Ukraine Nuclear Power Plant (NPP). A Plant Computer, which is also called the Computer Information System (CIS), is one of the key safety-related systems at VVER-1000 nuclear plants. The main function of the CIS is information support for the plant operators during normal and emergency operational modes. Before this upgrade, South Ukraine NPP operated out-of-date and obsolete systems. This upgrade project wax founded by the U.S. DOE in the framework of the International Nuclear Safety Program (INSP). The most efficient way to improve the quality and reliability of information provided to the plant operator is to upgrade the Human-System Interface (HSI), which is the Upper Level (UL) CIS. The upgrade of the CIS data-acquisition system (DAS), which is the Lower Level (LL) CIS, would have less effect on the unit safety. Generally speaking, the lifetime of the LL CIS is much higher than one of the UL CIS. Unlike Plant Computers at the Western-designed plants, the functionality of the WER-1000 CISs includes a control function (Centralized Protection Testing) and a number of the plant equipment monitoring functions, for example, Protection and Interlock Monitoring and Turbo-Generator Temperature Monitoring. The new system is consistent with a historical migration of the format by which information is presented to the operator away from the traditional graphic displays, for example, Piping and Instrument Diagrams (P and ID's), toward Integral Data displays. The cognitive approach to information presentation is currently limited by some licensing issues, but is adapted to a greater degree with each new system. The paper provides some lessons learned on the management of the international team. (authors)

  13. U.S.-Russia MPC and A upgrades at the Beloyarsk Nuclear Power Plant

    International Nuclear Information System (INIS)

    Saraev, O.; Haase, M.; Smarto, C.; Mikkelsen, K.; Heinberg, C.; Showalter, R.; Soo Hoo, M.; Hatcher, C.; Forehand, M.

    1998-01-01

    During the January 1996 meeting of the Gore-Chernomyrdin Commission, the Beloyarsk Nuclear Power Plant (BNPP) was identified as one of the additional sites for cooperative projects on upgrading Materials Protection, Control and Accounting (MPC and A). Since June 1996, Sandia National Laboratories (SNL), Pacific Northwest National Laboratories (PNNL), and Los Alamos National Laboratory (LANL) have worked with BNPP to upgrade MPC and A at the facility. Some unique challenges were encountered because BNPP has an operating BN-600 600-Megawatt breeder reactor. SNL has been responsible for working with BNPP to implement physical protection upgrades to the Central Alarm Station, Fresh Fuel Storage building, Spent Fuel Storage Area, and Vehicle/Personnel Portal. In addition, improved communication equipment for the Ministry of the Interior (MVD) guards and training of personnel were provided. PNNL has been responsible for coordinating Material Control and Accounting (MC and A) upgrades at BNPP. PNNL, in conjunction with LANL, has implemented such MC and A upgrades as a computerized nuclear materials accounting system, training in MC and A elements, nondestructive assay instrumentation for fresh fuel, installation of a fork detector for measuring spent fuel, and installation of an underwater video camera for verification of spent fuel serial numbers

  14. Seismic evaluation and upgrading design of overhead roads between reactor buildings of WWER-1000 MW type NPP

    International Nuclear Information System (INIS)

    Jordanov, M.J.; Stoyanov, G.S.; Geshanov, I.H.; Kirilov, K.P.; Schuetz, W.

    2003-01-01

    This paper presents results obtained during the study of overhead roads between Reactor Building (RB) of WWER-1000 MW NPP and possible measures for their seismic upgrade. The main objective of this project is to evaluate the behavior of overhead roads under site-specific seismic loading and to determine whether this structure satisfies current international safety regulations, followed by development of upgrading concepts. Overhead roads are pre-cast RC structure, which can be divided to separate substructures. They comprise of pedestrian gallery and pipeline box, connecting reactor buildings with auxiliary building. They are mounted at approximately 10 m above ground level. The overhead roads are evaluated for Review Level Earthquake (RLE) as seismic category II structures. As seismic input motion is RLE, free field response spectra anchored to 0.2 g PGA are used with 0.5 scaling factor. Soil-Structure Interaction effects are taken into account through equivalent soil springs with frequency adjusted stiffness. In order to meet the objective of the project a technical design specification is developed for conformance with International, US and Bulgarian standards and codes, taking into account site specific conditions. The general approach is consistent with up-to-date practice for evaluation and upgrade of nuclear power plant facilities. The separate steps comprising the overall fulfillment of project's major objectives may be summarized as follows: study of all available data for initial design and as built conditions, creation of 3-D detailed finite element models for as-built structure, determination of dynamic characteristics, evaluation of adequacy of initial design under new seismic loading (calculation of D/C ratios for structural members and connections, evaluation of embedment lengths for embedded parts and rebars, deformation evaluation, stability checks), development of upgrading concepts for enhancement, verification of capability of upgraded structure

  15. Soft ware upgrade for Mobile Laboratories in Estonia, Latvia and Lithuania

    DEFF Research Database (Denmark)

    Bargholz, Kim; Andersen, Frank

    1998-01-01

    In July-August 1998 the soft ware for controlling the measurements in the mobile laboratories have been upgraded. The mobile laboratories are sponsored by Danish east aid projects in cooperation with Rotaray Denmark.The equipment used is 4 L NaI(Tl) detectors mounted on the roof of the cars toget...

  16. I{sup Y}Q upgrading at a 1 bbl/d scale

    Energy Technology Data Exchange (ETDEWEB)

    Brown, W. [ETX Systems, Calgary, AB (Canada)

    2009-07-01

    The complex relationships between the many chemical and physical processes involved in heavy oil thermal upgrading have inhibited technology development in heavy oil because these underlying processes have been difficult to quantify. This paper presented a model which provides focus for the development of new upgrading technology. It is based on the understanding that product yields and qualities are influenced by the balance between mass transfer and reaction kinetics. ETX Systems developed the I{sup Y}Q upgrading technology which exceeds benchmarks in terms of liquid yields, product qualities and economics. The attributes of the technology result in a smaller environmental footprint associated with heavy oil development. A pilot plant has been built at a 1 bbl/day scale. The fluidized bed process complete with circulation of hot solids was commissioned in the fall of 2007. The unit has since provided field support for the original yield and quality claims assigned to the I{sup Y}Q upgrading technology. The results have exceeded original expectations. ETX Systems has also launched a project to prove commercial operability at a scale of 2000 bbl/day. This presentation focused on the challenges faced during the pilot exercise. The results have shown the advantage of lowering operating temperatures with respect to both yield and quality. tabs., figs.

  17. Electron-cloud simulation studies for the CERN-PS in the framework of the LHC Injectors Upgrade project

    CERN Document Server

    Rioja Fuentelsaz, Sergio

    The present study aims to provide a consistent picture of the electron cloud effect in the CERN Proton Synchrotron (PS) and to investigate possible future limitations due to the requirements foreseen by the LHC Injectors Upgrade (LIU) project. It consists of a complete simulation survey of the electron cloud build-up in the different beam pipe sections of the ring depending on several controllable beam parameters and vacuum chamber surface properties, covering present and future operation parameters. As the combined function magnets of the accelerator constitute almost the $80\\%$ in length of the ring, the implementation of a new feature for the simulation of any external magnetic field on the PyECLOUD code, made it possible to perform this study. All the results of the simulations are given as a function of the vacuum chamber surface properties in order to deduce them, both locally and globally, when compared with experimental data. In a first step, we characterize locally the maximum possible number of ...

  18. GENII: The Hanford Environmental Radiation Dosimetry Software System: Volume 2, Users' manual: Hanford Environmental Dosimetry Upgrade Project

    International Nuclear Information System (INIS)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-11-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). The purpose of this coupled system of computer codes is to analyze environmental contamination of, air, water, or soil. This is accomplished by calculating radiation doses to individuals or populations. GENII is described in three volumes of documentation. This second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. The first volume describes the theoretical considerations of the system. The third volume is a Code Maintenance Manual for the user who requires knowledge of code detail. It includes logic diagrams, global dictionary, worksheets, example hand calculations, and listings of the code and its associated data libraries. 27 refs., 17 figs., 23 tabs

  19. Injection septa position and angle optimisation in view of the 2 GeV liu upgrade of the CERN PS

    CERN Document Server

    Serluca, HM; Forte, V; Fraser, M; Sterbini, G

    2017-01-01

    In the framework of the LHC Injector Upgrade (LIU)project the CERN PS injection kinetic energy will be up-graded from 1.4 to 2 GeV. The injection equipment, whichis already operating close to its limit, is being redesigned tocope with 30% increase in the beam rigidity. In this paper wepresent the experimental results from Machine Development(MD) studies on the present septum to explore its operationalhardware limits with respect to aperture restrictions, beamlosses and kick strengths in view of the LIU upgrade

  20. Control and data acquisition upgrades for NSTX-U

    Energy Technology Data Exchange (ETDEWEB)

    Davis, W.M., E-mail: bdavis@pppl.gov; Tchilinguirian, G.J., E-mail: gtchilin@pppl.gov; Carroll, T., E-mail: tcarroll@pppl.gov; Erickson, K.G., E-mail: kerickson@pppl.gov; Gerhardt, S.P., E-mail: sgerhardt@pppl.gov; Henderson, P., E-mail: phenderson@pppl.gov; Kampel, S.H., E-mail: skampel@pppl.gov; Sichta, P., E-mail: psichta@pppl.gov; Zimmer, G.N., E-mail: gzimmer@pppl.gov

    2016-11-15

    Highlights: • The NSTX-U upgrade is nearing completion, and various control and data acquisition upgrades are needed. • The Digital Coil Protection System is a major addition which provides hardware and software to protect the magnetic coils from the complex, increased, stresses added from the upgrade. • The increased computational requirements for the upgrade have largely followed Moore’s Law, and enhancements to the infrastructure and computer hardware should maintain or exceed the previous functionality. • Data requirements for Fast 2-D cameras have exceeded those of “conventional” time-varying signals. There has been a particular emphasis and increase in data from IR cameras. - Abstract: The extensive NSTX Upgrade (NSTX-U) Project includes major components which allow a doubling of the toroidal field strength to 1 T, of the Neutral Beam heating power to 12 MW, and the plasma current to 2 MA, and substantial structural enhancements to withstand the increased electromagnetic loads. The maximum pulse length will go from 1.5 to 5 s. The larger and more complex forces on the coils will be protected by a Digital Coil Protection System, which requires demanding real-time data input rates, calculations and responses. The amount of conventional digitized data for a given pulse is expected to increase from 2.5 to 5 GB per second of pulse. 2-D Fast Camera data is expected to go from 2.5 GB/pulse to 10, and another 2 GB/pulse is expected from new IR cameras. Our network capacity will be increased by a factor of 10, with 10 Gb/s fibers used for the major trunks. 32-core Linux systems will be used for several functions, including between-shot data processing, MDSplus data serving, between-shot EFIT analysis, real-time processing, and for a new capability, between-shot TRANSP. Improvements to the MDSplus events subsystem will be made through the use of both UDP and TCP/IP based methods and the addition of a dedicated “event server”.

  1. Towards novel biogas upgrading processes

    Energy Technology Data Exchange (ETDEWEB)

    Privalova, E.

    2013-06-01

    Biogas production has considerable development possibilities not only in Finland but all over the world since it it the easiest way of creating value out of various waste fractions and represents an alternative source of renewable energy. Development of efficient biogas upgrading technology has become an important issue since it improves the quality of biogas and for example facilitating its injection into the natural gas pipelines. Moreover, such upgrading contributes to resolving the issue of increasing CO{sub 2} emissions and addresses the increasing climate change concerns. Together with traditional CO{sub 2} capturing technologies a new class of recently emerged sorbents such as ionic liquids is claimed as promising media for gas separations. In this thesis, an extensive comparison of the performance of different solvents in terms of CO{sub 2} capture has been performed. The focus of the present study was on aqueous amine solutions and their mixtures, traditional ionic liquids, 'switchable' ionic liquids and poly(ionic liquid)s in order to reveal the best option for biogas upgrading. The CO{sub 2} capturing efficiency for the most promising solvents achieved values around 50-60 L CO{sub 2}/L absorbent. These values are superior to currently widely applied water wash biogas upgrading system. Regeneration of the solvent mixtures appeared to be challenging since the loss of initial efficiency upon CO{sub 2} release was in excess of 20-40 vol %, especially in the case of aqueous amine solutions. In contrast, some of the ionic liquids displayed reversible behavior. Thus, for selected 'switchable' ionic and poly(ionic liquid)s the CO{sub 2} absorption/regeneration cycles were performed 3-4 times without any notable efficiency decrease. The viscosity issue, typical for ionic liquids upon CO{sub 2} saturation, was addressed and the information obtained was evaluated and related to the ionic interactions. The occurrence of volatile organic compounds

  2. Studies of ageing effects of Small-Strip Thin Gap Chambers for the Muon Spectrometer Upgrade of the ATLAS Experiment

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00425540; The ATLAS collaboration

    2016-01-01

    The instantaneous luminosity of the Large Hadron Collider at CERN will be increased by up to seven times its design value by undergoing an extensive upgrade program over the coming decade. The largest upgrade project for the ATLAS Muon System is the replacement of the present first station in the forward regions with the so-called New Small Wheels (NSWs), to be installed during the LHC long shutdown in 2019-2020. Small-Strip Thin Gap Chambers (sTGC) detectors are one chosen technology to provide fast trigger and high precision muon tracking under the high luminosity LHC conditions. The basic sTGC structure consists of a grid of gold-plated tungsten wires sandwiched between two resistive cathode planes at a small distance from the wire plane. We study ageing effects of sTGC detectors with a gas mixture of 55\\% of CO$_{2}$ and 45\\% of n-pentane. A sTGC detector was irradiated with beta-rays from a 10~mCi~$^{90}$Sr source. Three different gas flow rates were tested. We observed no deterioration on pulse height o...

  3. Studies of ageing effects of Small-Strip Thin Gap Chambers for the Muon Spectrometer Upgrade of the ATLAS Experiment

    CERN Document Server

    Gignac, Matthew; The ATLAS collaboration

    2016-01-01

    The instantaneous luminosity of the Large Hadron Collider at CERN will be increased up to a factor of five with respect to the design value by undergoing an extensive upgrade program over the coming decade. The largest upgrade project for the ATLAS Muon System is the replacement of the present first station in the forward regions with the so-called New Small Wheels (NSWs), to be installed during the LHC long shutdown in 2019/20. Small-Strip Thin Gap Chambers (sTGC) detectors are one chosen technology to provide fast trigger and high precision muon tracking under the high luminosity LHC conditions. The basic sTGC structure consists of a grid of gold-plated tungsten wires sandwiched between two resistive cathode planes at a small distance from the wire plane. We study ageing effects of sTGC detectors with a gas mixture of 55% of CO_2 and 45% of n-pentane. A sTGC detector was irradiated with beta-rays from a Sr-90 source. Three different gas flow rates were tested. We observed no deterioration on pulse height of...

  4. Advanced Neutron Source (ANS) Project Progress report, FY 1991

    International Nuclear Information System (INIS)

    Campbell, J.H.; Selby, D.L.; Harrington, R.M.; Thompson, P.B.

    1992-01-01

    This report discusses the following about the Advanced Neutron Source: Project Management; Research and Development; Fuel Development; Corrosion Loop Tests and Analyses; Thermal-Hydraulic Loop Tests; Reactor Control and Shutdown Concepts; Critical and Subcritical Experiments; Material Data, Structural Tests, and Analysis; Cold-Source Development; Beam Tube, Guide, and Instrument Development; Hot-Source Development; Neutron Transport and Shielding; I ampersand C Research and Development; Design; and Safety

  5. A Neutral Beam Injector Upgrade for NSTX

    International Nuclear Information System (INIS)

    Stevenson, T.; McCormack, B.; Loesser, G.D.; Kalish, M.; Ramakrishnan, S.; Grisham, L.; Edwards, J.; Cropper, M.; Rossi, G.; Halle, A. von; Williams, M.

    2002-01-01

    The National Spherical Torus Experiment (NSTX) capability with a Neutral Beam Injector (NBI) capable of 80 kiloelectronvolt (keV), 5 Megawatt (MW), 5 second operation. This 5.95 million dollar upgrade reused a previous generation injector and equipment for technical, cost, and schedule reasons to obtain these specifications while retaining a legacy capability of 120 keV neutral particle beam delivery for shorter pulse lengths for possible future NSTX experiments. Concerns with NBI injection included power deposition in the plasma, aiming angles from the fixed NBI fan array, density profiles and beam shine through, orbit losses of beam particles, and protection of the vacuum vessel wall against beam impingement. The upgrade made use of the beamline and cryo panels from the Neutral Beam Test Stand facility, existing power supplies and controls, beamline components and equipment not contaminated by tritium during DT [deuterium-tritium] experiments, and a liquid Helium refrigerator plant to power and cryogenically pump a beamline and three ion sources. All of the Tokamak Fusion Test Reactor (TFTR) ion sources had been contaminated with tritium, so a refurbishment effort was undertaken on selected TFTR sources to rid the three sources destined for the NSTX NBI of as much tritium as possible. An interconnecting duct was fabricated using some spare and some new components to attach the beamline to the NSTX vacuum vessel. Internal vacuum vessel armor using carbon tiles was added to protect the stainless steel vacuum vessel from beam impingement in the absence of plasma and interlock failure. To date, the NBI has operated to 80 keV and 5 MW and has injected requested power levels into NSTX plasmas with good initial results, including high beta and strong heating characteristics at full rated plasma current

  6. The ALICE Inner Tracking System Upgrade

    CERN Document Server

    Siddhanta, Sabyasachi

    2015-01-01

    The long term plan of ALICE (A Large Ion Collider Experiment) at the CERN Large Hadron Collider (LHC) is a detailed investigation and characterisation of the Quark-Gluon Plasma (QGP). ALICE has devised a comprehensive upgrade strategy to enhance its physics capabilities and to exploit the LHC running conditions after the second long shutdown of the LHC scheduled in 2019-20. The upgraded ALICE will focus on high precision measurements of rare probes over a wide range of momenta, which will significantly improve the performance with respect to the present experimental set up. The upgrade strategy is based on the fact that after LS2 LHC will progressively increase its luminosity with Pb beams eventually reaching an interaction rate of about 50 kHz. To exploit the new LHC capabilities, several existing detectors will undergo a substantial upgrade and new detectors will be added. Within this upgrade strategy, the Inner Tracking System (ITS) upgrade forms an important cornerstone, providing precise measurements for...

  7. Green technologies for the environmental upgrading of infrastructures

    Directory of Open Access Journals (Sweden)

    Alessandra Battisti

    2013-05-01

    Full Text Available Over the last few decades, the globalization phenomenon has determined the exponential development - from an economic, cultural and political standpoint - of traffic flows, the number of means and infrastructures involved in communication and exchange. At the same time, these represent one of the most complicated environmental issues of contemporary times, but perhaps also one of the most outstanding opportunities for setting up processes aimed at upgrading the territory and its constructions, towards environmental regeneration and social reorganization. These, in turn, would produce and spread (as in some already established examples of infrastructure upgrading innovative and more sustainable forms of urban lifestyles. The present contribution aims at illustrating the former, beginning with research and experiments involving the development of eco-friendly meta-design models for the correct employment of “green technologies” in: meta-project research for small mobility facilities; expansion and redevelopment works for the Stazione Termini; experiments in design for some energy-efficient underground metro stops in Rome.

  8. Maintenance procedure upgrade programs

    International Nuclear Information System (INIS)

    Campbell, J.J.; Zimmerman, C.M.

    1988-01-01

    This paper describes a systematic approach to upgrading nuclear power plant maintenance procedures. The approach consists of four phases: diagnosis, program planning, program implementation, and program evaluation. Each phase is explained as a series of steps to ensure that all factors in a procedure upgrade program are considered

  9. The STAR beam energy scan phase II physics and upgrades

    Czech Academy of Sciences Publication Activity Database

    Yang, C.; Adamczyk, L.; Adkins, J. K.; Agakishiev, G.; Bielčík, J.; Bielčíková, Jana; Chaloupka, P.; Federič, Pavol; Rusňák, Jan; Rusňáková, O.; Šimko, Miroslav; Šumbera, Michal; Vértési, Robert

    2017-01-01

    Roč. 967, č. 11 (2017), s. 800-803 ISSN 0375-9474 R&D Projects: GA MŠk LG15001; GA MŠk LM2015054 Institutional support: RVO:61389005 Keywords : STAR collaboration * BES-II * detector upgrade * QCD phase diagram * physics oppotrunity Subject RIV: BG - Nuclear, Atomic and Molecular Physics, Colliders OBOR OECD: Nuclear physics Impact factor: 1.916, year: 2016

  10. ATLAS Detector Upgrade Prospects

    International Nuclear Information System (INIS)

    Dobre, M

    2017-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC was ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015 and 2016. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, which will deliver of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred fb −1 expected for LHC running by the end of 2018 to 3000 fb −1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extensions to larger pseudorapidity, particularly in tracking and muon systems. This report summarizes various improvements to the ATLAS detector required to cope with the anticipated evolution of the LHC luminosity during this decade and the next. A brief overview is also given on physics prospects with a pp centre-of-mass energy of 14 TeV. (paper)

  11. Software upgrade for the DIII-D neutral beam control systems

    International Nuclear Information System (INIS)

    Cummings, J.W.; Thurgood, P.A.

    1992-01-01

    This paper reports on the Neutral Beam Software Upgrade project which was launched in early 1990. The major goals were to upgrade the MAC IV operating system to the latest revision (K.1), use standard MODCOMP software (as much as possible), and to develop a very user friendly, versatile system. Accomplishing these goals required new software to be developed and modifications to existing applications software to make it compatible with the latest operating system. The custom operating system modules to handle the message service and interrupt handling were replaced by the standard MODCOMP Inter Task Communication (ITC) and interrupt routines that are part of the MAX IV operating system. The message service provides the mechanism for doing shot task sequencing (task scheduling). The interrupt routines are used to connect external irterrupts to the system

  12. U.S.-China Radiological Source Security Project: Continuing And Expanding Bilateral Cooperation

    International Nuclear Information System (INIS)

    Zhu, Zhixuan; Zhou, Qifu; Yang, Yaoyun; Huang, Chaoyun; Lloyd, James; Williams, Adam; Feldman, Alexander; Streeper, Charles; Pope, Noah G.; Hawk, Mark; Rawl, Rick; Howell, Randy A.; Kennedy, Catherine

    2009-01-01

    The successful radiological security cooperation between the U.S. and China to secure at-risk sites near venues of the 2008 Beijing Summer Olympics has led to an expanded bilateral nonproliferation cooperation scope. The U.S. Department of Energy's National Nuclear Security Administration, the Chinese Atomic Energy Authority and the China Ministry of Environmental Protection are continuing joint efforts to secure radiological sources throughout China under the U.S.-China Peaceful Uses of Nuclear Technology (PUNT) Agreement. Joint cooperation activities include physical security upgrades of sites with International Atomic Energy Agency (IAEA) Category 1 radiological sources, packaging, recovery, and storage of high activity transuranic and beta gamma sources, and secure transportation practices for the movement of recovered sources. Expansion of cooperation into numerous provinces within China includes the use of integrated training workshops that will demonstrate methodologies and best practices between U.S. and Chinese radiological source security and recovery experts. The fiscal year 2009 expanded scope of cooperation will be conducted similar to the 2008 Olympic cooperation with the Global Threat Reduction Initiative taking the lead for the U.S., PUNT being the umbrella agreement, and Los Alamos, Sandia, and Oak Ridge National Laboratories operating as technical working groups. This paper outlines the accomplishments of the joint implementation and training efforts to date and discusses the possible impact on future U.S./China cooperation.

  13. U.S.-CHINA RADIOLOGICAL SOURCE SECURITY PROJECT: CONTINUING AND EXPANDING BILATERAL COOPERATION

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Zhixuan; Zhou, Qifu; Yang, Yaoyun; Huang, Chaoyun; Lloyd, James; Williams, Adam; Feldman, Alexander; Streeper, Charles; Pope, Noah G.; Hawk, Mark; Rawl, Rick; Howell, Randy A.; Kennedy, Catherine

    2009-10-07

    The successful radiological security cooperation between the U.S. and China to secure at-risk sites near venues of the 2008 Beijing Summer Olympics has led to an expanded bilateral nonproliferation cooperation scope. The U.S. Department of Energy’s National Nuclear Security Administration, the Chinese Atomic Energy Authority and the China Ministry of Environmental Protection are continuing joint efforts to secure radiological sources throughout China under the U.S.-China Peaceful Uses of Nuclear Technology (PUNT) Agreement. Joint cooperation activities include physical security upgrades of sites with International Atomic Energy Agency (IAEA) Category 1 radiological sources, packaging, recovery, and storage of high activity transuranic and beta gamma sources, and secure transportation practices for the movement of recovered sources. Expansion of cooperation into numerous provinces within China includes the use of integrated training workshops that will demonstrate methodologies and best practices between U.S. and Chinese radiological source security and recovery experts. The fiscal year 2009 expanded scope of cooperation will be conducted similar to the 2008 Olympic cooperation with the Global Threat Reduction Initiative taking the lead for the U.S., PUNT being the umbrella agreement, and Los Alamos, Sandia, and Oak Ridge National Laboratories operating as technical working groups. This paper outlines the accomplishments of the joint implementation and training efforts to date and discusses the possible impact on future U.S./China cooperation.

  14. Upgrading biogas by a low-temperature CO2 removal techni

    Directory of Open Access Journals (Sweden)

    Ahmed M.I. Yousef

    2016-06-01

    Full Text Available Biogas, a renewable energy source, is primarily composed of methane and carbon dioxide and other gaseous species. Biogas upgrading for removing CO2 from raw biogas is a necessary step before the biogas to be used as vehicle fuel or injected into the natural gas grid. Therefore, the present work aimed to propose a low-temperature CO2 removal process as an alternative to the conventional biogas upgrading technologies (water scrubbing, chemical and physical scrubbing, membranes and Pressure swing adsorption. A typical model biogas mixture of 60 mol.% CH4 and 40 mol.% CO2 is considered. The present process showed that a product purity of 94.5 mol.% CH4 is obtained from compressed biogas by combining distillation, flash separation, auxiliary refrigeration and internal heat recovery with a potential specific energy consumption of 0.26 kW h/Nm3 raw biogas. The process has been simulated in Aspen HYSYS with avoiding the occurrence of CO2 freeze-out. The process delivers the captured CO2 in liquid form with a purity of 99.7 mol.% as a by-product for transport at 110 bar. It is concluded that the proposed upgrading process can serve as a new environmentally friendly approach to CO2 removal with an interesting energy-efficient alternative to the conventional upgrading techniques.

  15. 7 CFR 1709.109 - Eligible projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Eligible projects. 1709.109 Section 1709.109... projects. Eligible projects are those that acquire, construct, extend, repair, upgrade or otherwise improve... are eligible. Projects providing or improving service to communities with extremely high energy costs...

  16. Recent activities of the international Group on Research Reactors (IGORR) and of the Advanced Neutron Source (ANS)

    International Nuclear Information System (INIS)

    West, C.D.

    1992-01-01

    The International Group on Research Reactors (IGORR) was formed in 1990 to facilitate the sharing of knowledge and experience among those institutions and individuals who are actively working to design, build, and promote new research reactors or to make significant upgrades to existing facilities. The Advanced Neutron Source Project expects to complete conceptual design in mid-1992. In the present design concept, the neutron source is a heavy-water-cooled, moderated, and reflected reactor of about 350 MW(f) power. (author)

  17. South American Source Removal Project

    International Nuclear Information System (INIS)

    Nader, Alejandro V.

    2017-01-01

    Main objective of the project: •Thanks to Canada funding and IAEA technical assistance the main objective is to remove 29 disused sealed radioactive sources (DSRS), from 5 member states in Latin America region (Bolivia - Ecuador - Paraguay – Peru – Uruguay) to an authorized recipient for their final management. •It includes packaging of the DSRS and the DU working shields, customs arrangement for the export from the respective countries and import to the final destination in the Authorized Recipient’s country, transportation, deposit and hand over to an Authorized Recipient

  18. Towards a resilience management framework for complex enterprise systems upgrade implementation

    Science.gov (United States)

    Teoh, Say Yen; Yeoh, William; Zadeh, Hossein Seif

    2017-05-01

    The lack of knowledge of how resilience management supports enterprise system (ES) projects accounts for the failure of firms to leverage their investments in costly ES implementations. Using a structured-pragmatic-situational (SPS) case study research approach, this paper reports on an investigation into the resilience management of a large utility company as it implemented an ES upgrade. Drawing on the literature and on the case study findings, we developed a process-based resilience management framework that involves three strategies (developing situation awareness, demystifying threats, and executing restoration plans) and four organisational capabilities that transform resilience management concepts into practices. We identified the crucial phases of ES upgrade implementation and developed indicators for how different strategies and capabilities of resilience management can assist managers at different stages of an ES upgrade. This research advances the state of existing knowledge by providing specific and verifiable propositions for attaining a state of resilience, the knowledge being grounded in the empirical reality of a case study. Moreover, the framework offers ES practitioners a roadmap to better identify appropriate responses and levels of preparedness.

  19. Experience with the upgraded VERONA-u WWER-440 core monitoring system

    International Nuclear Information System (INIS)

    Lux, I.; Vegh, J.; Adorjan, F.; Buerger, L.

    1994-01-01

    The paper describes the components, functioning and services of the VERONA-u core monitoring system recently installed at Unit 2 and 3 of the Hungarian Paks NPP. The VERONA-u is a totally upgraded and modernized version of the previous VERONA system, in the upgrading project the data-concentrator, the host computer and the operators' displays were replaced by state-of-the-art hardware and software components. Dual hardware redundancy and automatic function recovery actions were introduced in order to ensure high system availability. The man-machine interface has been redesigned completely, applying X Windows as Graphical User Interface. Improved core analysis and power reconstruction methods were introduced, together with a detailed hot-spot monitoring algorithm. A capable archivation module ensures periodic logging of all measured data, change sensitive storage of important signal changes and provides sophisticated post-mortem analysis tools. The upgraded system has been working satisfactorily on Unit 2 for a complete fuel cycle by now, the on-line system response in complex, transient situations is illustrated in the paper. (author). 10 refs, 4 figs

  20. Upgrading Preschool Environment in a Swedish Municipality: Evaluation of an Implementation Process.

    Science.gov (United States)

    Altin, Carolina; Kvist Lindholm, Sofia; Wejdmark, Mats; Lättman-Masch, Robert; Boldemann, Cecilia

    2015-07-01

    Redesigning outdoor preschool environment may favorably affect multiple factors relevant to health and reach many children. Cross-sectional studies in various landscapes at different latitudes have explored the characteristics of preschool outdoor environment considering the play potential triggering combined physical activity and sun-protective behavior due to space, vegetation, and topography. Criteria were pinpointed to upgrade preschool outdoor environment for multiple health outcomes to be applied in local government in charge of public preschools. Purposeful land use policies and administrative management of outdoor land use may serve to monitor the quality of preschool outdoor environments (upgrading and planning). This study evaluates the process of implementing routines for upgrading outdoor preschool environments in a medium-sized municipality, Sweden, 2008-2011, using qualitative and quantitative analysis. Recorded written material (logs and protocols) related to the project was processed using thematic analysis. Quantitative data (m(2) flat/multileveled, overgrown/naked surface, and fraction of free visible sky) were analyzed to assess the impact of implementation (surface, topography, greenery integrated in play). The preschool outdoor environments were upgraded accordingly. The quality of implementation was assessed using the theory of policy streams approach. Though long-term impact remains to be confirmed the process seems to have changed work routines in the interior management for purposeful upgrading of preschool outdoor environments. The aptitude and applicability of inexpensive methods for assessing, selecting, and upgrading preschool land at various latitudes, climates, and outdoor play policies (including gender aspects and staff policies) should be further discussed, as well as the compilation of data for monitoring and evaluation. © 2015 Society for Public Health Education.

  1. Simulation and design of an electron beam ion source charge breeder for the californium rare isotope breeder upgrade

    Directory of Open Access Journals (Sweden)

    Clayton Dickerson

    2013-02-01

    Full Text Available An electron beam ion source (EBIS will be constructed and used to charge breed ions from the californium rare isotope breeder upgrade (CARIBU for postacceleration into the Argonne tandem linear accelerator system (ATLAS. Simulations of the EBIS charge breeder performance and the related ion transport systems are reported. Propagation of the electron beam through the EBIS was verified, and the anticipated incident power density within the electron collector was identified. The full normalized acceptance of the charge breeder with a 2 A electron beam, 0.024π  mm mrad for nominal operating parameters, was determined by simulating ion injection into the EBIS. The optics of the ion transport lines were carefully optimized to achieve well-matched ion injection, to minimize emittance growth of the injected and extracted ion beams, and to enable adequate testing of the charge bred ions prior to installation in ATLAS.

  2. Fast and efficient charge breeding of the Californium rare isotope breeder upgrade electron beam ion source

    International Nuclear Information System (INIS)

    Ostroumov, P. N.; Barcikowski, A.; Dickerson, C. A.; Perry, A.; Sharamentov, S. I.; Vondrasek, R. C.; Zinkann, G. P.; Pikin, A. I.

    2015-01-01

    The Electron Beam Ion Source (EBIS), developed to breed Californium Rare Isotope Breeder Upgrade (CARIBU) radioactive beams at Argonne Tandem Linac Accelerator System (ATLAS), is being tested off-line. A unique property of the EBIS is a combination of short breeding times, high repetition rates, and a large acceptance. Overall, we have implemented many innovative features during the design and construction of the CARIBU EBIS as compared to the existing EBIS breeders. The off-line charge breeding tests are being performed using a surface ionization source that produces singly charged cesium ions. The main goal of the off-line commissioning is to demonstrate stable operation of the EBIS at a 10 Hz repetition rate and a breeding efficiency into single charge state higher than 15%. These goals have been successfully achieved and exceeded. We have measured (20% ± 0.7%) breeding efficiency into the single charge state of 28+ cesium ions with the breeding time of 28 ms. In general, the current CARIBU EBIS operational parameters can provide charge breeding of any ions in the full mass range of periodic table with high efficiency, short breeding times, and sufficiently low charge-to-mass ratio, 1/6.3 for the heaviest masses, for further acceleration in ATLAS. In this paper, we discuss the parameters of the EBIS and the charge breeding results in a pulsed injection mode with repetition rates up to 10 Hz

  3. Upgrades of the ATLAS trigger system

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00221618; The ATLAS collaboration

    2018-01-01

    In coming years the LHC is expected to undergo upgrades to increase both the energy of proton-proton collisions and the instantaneous luminosity. In order to cope with these more challenging LHC conditions, upgrades of the ATLAS trigger system will be required. This talk will focus on some of the key aspects of these upgrades. Firstly, the upgrade period between 2019-2021 will see an increase in instantaneous luminosity to $3\\times10^{34} \\rm{cm^{-2}s^{-1}}$. Upgrades to the Level 1 trigger system during this time will include improvements for both the muon and calorimeter triggers. These include the upgrade of the first-level Endcap Muon trigger, the calorimeter trigger electronics and the addition of new calorimeter feature extractor hardware, such as the Global Feature Extractor (gFEX). An overview will be given on the design and development status the aforementioned systems, along with the latest testing and validation results. \\\\ By 2026, the High Luminosity LHC will be able to deliver 14 TeV collisions ...

  4. Alberta oil sands crudes : upgrading and marketing

    International Nuclear Information System (INIS)

    Ashar, M.

    2008-01-01

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs

  5. Alberta oil sands crudes : upgrading and marketing

    Energy Technology Data Exchange (ETDEWEB)

    Ashar, M. [Suncor Energy, Fort McMurray, AB (Canada)

    2008-05-15

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs.

  6. Upgrade of ICRF heating system on EAST

    International Nuclear Information System (INIS)

    Chen Gen; Zhao Yanpin; Mao Yuzhou

    2013-01-01

    ICRF (Ion Cyclotron Range of Frequency) heating is an essential heating and current drive tool on EAST (Experimental Advanced Superconducting Tokamak). The high-power steady-state transmitters were designed as a part of research and development of ICRF heating system which aimed at output power of 1.5 MW for 1000 s in a frequency range of 25 to 70 MHz. There are 3 stage power amplifiers for each transmitter. Tube TH525A and TH535 were chosen for drive power amplifier (DPA) and final power amplifier (FPA), respectively. The power supply system of DPA and FPA were upgraded by using reliable PSM high voltage sources, whose response time is less than 5 μs. The ICRF system, which consists of 8 transmitters, will give out more than 10 MW total output power in the future. Four of them have been already fabricated, and another four are under construction. Three liquid stub tuners are used for impedance matching between antennas and transmitters, which can be only tuned shot to shot. There are two fast wave heating antennas which are assembled at I port and B port on EAST. Several projects are in progress including fast response impedance matching, distributed data acquisition and control system and so on for EAST ICRF heating system. (author)

  7. To upgrade or not to upgrade

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn; Rose, Jørgen

    2017-01-01

    This paper identifies the key indicators that owners need to take into account in order to choose the most affordable extent of upgrading of a typical post-1945 building. The exterior look of the building is not to be changed. Indicators include measures, risk assessment related to the changes in...

  8. National synchrotron light source basic design and project status

    International Nuclear Information System (INIS)

    van Steenbergen, A.

    1981-01-01

    A summary description and the basic design parameters of the National Synchrotron Light Source, a facility for the generation of intense synchrotron radiation in the vuv and x-ray range is presented, the parameters of the sources are given, the presently planned facility beam lines are tabulated and the status of the project is indicated

  9. AGS intensity upgrades

    International Nuclear Information System (INIS)

    Roser, T.

    1995-01-01

    After the successful completion of the AGS Booster and several upgrades of the AGS, a new intensity record of 6.3 x 10 13 protons per pulse accelerated to 24 GeV was achieved. The high intensity slow-extracted beam program at the AGS typically serves about five production targets and about eight experiments including three rare Kaon decay experiments. Further intensity upgrades are being discussed that could increase the average delivered beam intensity by up to a factor of four

  10. Upgrading uncompetitive products economically

    DEFF Research Database (Denmark)

    Lu, Hua; Jensen, Christian Søndergaard

    2012-01-01

    for upgrading an uncompetitive product, and combine the solutions into a single solution. We also propose a spatial join-based solution that assumes P and T are indexed by an R-tree. Given a set of products in the same R-tree node, we derive three lower bounds on their upgrading costs. These bounds are employed...

  11. ATLAS Upgrade Programme

    CERN Document Server

    Hillier, S J; The ATLAS collaboration

    2012-01-01

    With the already outstanding LHC luminosity performance, and planned LHC upgrades in the upcoming shutdowns, it is expected that within a short time-scale, the general purpose LHC experiments will have to cope with luminosities beyond their original design. In order to maintain detector performance and sensitivity to expected and new physics processes, ATLAS has defined a continuous upgrade programme which foresees staged enhancements during the next 10 years of operation, and then more widespread changes before the transition to the highest luminosities after 2022. This talk will describe several components of the ATLAS upgrade, focusing in particular on the Inner Detector and Trigger. The Inner Detector faces two challenges in the higher luminosity environment: high particle multiplicities and increased radiation dose. These will be addressed in the short term by a new layer of Pixel detectors, and in the long term by a complete replacement. The Trigger faces an increasingly difficult task of distinguishing...

  12. The Fermilab 400-MeV Linac Upgrade

    International Nuclear Information System (INIS)

    Schmidt, C.W.

    1993-05-01

    The Fermilab Linac Upgrade will increase the linac energy from 201 MeV to 401.5 MeV. Seven accelerating modules, composed of 805-MHz side-coupled cells, will accelerate H - beams from 116.5 to 401.5 MeV. The side-coupled structure (SCS) has been built, tuned, tested to full power, and placed in the linac enclosure along side the operating Linac. All seven accelerating modules, each containing four sections of sixteen cells, have been connected to 12-MW power klystrons and tested to full power for a significant period. The transition section to match the beam from the 201.25-MHz drift-tube linac to the SCS, consisting of a sixteen-cell cavity and a vernier four-cell cavity, has also been tested at full power. A new import line from the Linac to the Booster synchrotron with a new Booster injection girder is to be installed. Removal of the last four Alvarez linac tanks (116.5 to 201 MeV) and beam-line installation of the Upgrade components is to begin in early June 1993 and should take about 12 weeks. Beam commissioning of the project will follow and normal operation is expected in a short period. In preparation for beam commissioning, studies are being done with done operating linac to characterize the beam at transition and prepare for phase, amplitude and energy measurements to commission the new linac. The past, present and future activities of the 400-MeV Upgrade will be reviewed

  13. Bohunice Nuclear Power Plant Safety Upgrading Program

    International Nuclear Information System (INIS)

    Toth, A.; Fagula, L.

    1996-01-01

    Bohunice nuclear Power Plant generation represents almost 50% of the Slovak republic electric power production. Due to such high level of commitment to nuclear power in the power generation system, a special attention is given to safe and reliable operation of NPPs. Safety upgrading and operational reliability improvement of Bohunice V-1 NPP was carried out by the Bohunice staff continuously since the plant commissioning. In the 1990 - 1993 period extensive projects were realised. As a result of 'Small Reconstruction of the Bohunice V-1 NPP', the standards of both the nuclear safety and operational reliability have been significantly improved. The implementation of another modifications that will take place gradually during extended refuelling outages and overhauls in the course of 1996 through 1999, is referred to as the Gradual Reconstruction of the Bohunice V-1 Plant. The general goal of the V-1 NPP safety upgrading is the achievement of internationally acceptable level of nuclear safety. Extensive and financially demanding modification process of Bohunice V-2 NPP is likely to be implemented after a completion of the Gradual Reconstruction of the Bohunice V-1 NPP, since the year 1999. With this in mind, a first draft of the strategy of the Bohunice V-2 NPP upgrading program based on Probabilistic Safety assessment consideration was developed. A number of actions with a general effect on Bohunice site safety is evident. All these activities are aimed at reaching the essential objective of Bohunice NPP Management - to ensure a safe, reliable and effective electric energy and heat generation at the Bohunice site. (author)

  14. MAPS development for the ALICE ITS upgrade

    International Nuclear Information System (INIS)

    Yang, P.; Gao, C.; Huang, G.; Aglieri, G.; Cavicchioli, C.; Hillemanns, H.; Junique, A.; Kofarago, M.; Keil, M.; Kugathasan, T.; Tobon, C.A. Marin; Mager, M.; Martinengo, P.; Chalmet, P.L.; Chanlek, N.; Collu, A.; Marras, D.; Kim, D.; Kim, J.; Lattuca, A.

    2015-01-01

    Monolithic Active Pixel Sensors (MAPS) offer the possibility to build pixel detectors and tracking layers with high spatial resolution and low material budget in commercial CMOS processes. Significant progress has been made in the field of MAPS in recent years, and they are now considered for the upgrades of the LHC experiments. This contribution will focus on MAPS detectors developed for the ALICE Inner Tracking System (ITS) upgrade and manufactured in the TowerJazz 180 nm CMOS imaging sensor process on wafers with a high resistivity epitaxial layer. Several sensor chip prototypes have been developed and produced to optimise both charge collection and readout circuitry. The chips have been characterised using electrical measurements, radioactive sources and particle beams. The tests indicate that the sensors satisfy the ALICE requirements and first prototypes with the final size of 1.5 × 3 cm 2 have been produced in the first half of 2014. This contribution summarises the characterisation measurements and presents first results from the full-scale chips

  15. Forked and Integrated Variants In An Open-Source Firmware Project

    DEFF Research Database (Denmark)

    Stanciulescu, Stefan; Schulze, Sandro; Wasowski, Andrzej

    2015-01-01

    and interactive source management platforms such as Github. We study advantages and disadvantages of forking using the case of Marlin, an open source firmware for 3D printers. We find that many problems and advantages of cloning do translate to forking. Interestingly, the Marlin community uses both forking......Code cloning has been reported both on small (code fragments) and large (entire projects) scale. Cloning-in-the-large, or forking, is gaining ground as a reuse mechanism thanks to availability of better tools for maintaining forked project variants, hereunder distributed version control systems...

  16. Upgrading Planning and Executive Strategy for Reactor Protection System and Relative Equipment in Qinshan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Jiang Zuyue

    2010-01-01

    Qinshan Nuclear Power Plant (QNPP) is the first nuclear power plant in China which completed the reactor protection system (RPS) upgrading with new digital safety instrumentation and control (I and C) platform instead of original analog system. At the same time,the nuclear instrumentation system (NIS) was upgraded with the same digital I and C platform. For adapting QNPP's actual engineering situation,the upgrading planning was taken by comprehensively investigating current development and application of digital safety I and C platform in the worldwide scope and by reviewing plant's original systems operation history. The project executive strategy-QNPP's leading role with necessary overseas cooperation and internal technical supports as great as possible, was determined. Some significant factors might influence and restrict the RPS and relative equipment upgrading executive actions in an operating NPP were analyzed.Finally, the engineering feasibility was briefly assessed to recognize the anticipated issues and difficulties and to prepare the relative solutions in advance for the purpose of ensuring the RPS upgrading objectives completely realized. (authors)

  17. Upgrade for the epithermal neutron beam at NRI Rez

    International Nuclear Information System (INIS)

    Marek, M.; Flibor, S.; Viererbl, L.; Burian, J.; Rejchrt, J.; Klupak, V.; Gambarini, G.; Vanossi, E.

    2006-01-01

    The epithermal neutron beam facility designed for pre-clinical neutron capture therapy research has been operated at LVR-15 reactor for more than ten years. The construction of the beam filter has been recently modified especially for the shielding quality of the beam shutter to be improved. The parameters of the upgraded beam were calculated with the MCNP code and a new source term for the NCTPLAN treatment planning software was evaluated. The calculated source term was consequently scaled according to the results of measurements in the free beam and in the 50x50x25 cm 3 water phantom. (author)

  18. Poverty alleviation project review

    CSIR Research Space (South Africa)

    Braun, AL

    2003-01-01

    Full Text Available seven pure cashmere rams from project. EC (Emerging farmers) farmers have also received 43 upgraded cashmere rams from Dept. of Agric. EC From the plus minus 1800 goats involved in the project at least 450 kids / offspring of the improved goats have been...

  19. Advanced Neutron Source (ANS) Project

    International Nuclear Information System (INIS)

    Campbell, J.H.; Thompson, P.B.

    1994-01-01

    This report covers the progress made in 1993 in the following sections: (1) project management; (2) research and development; (3) design and (4) safety. The section on research and development covers the following: (1) reactor core development; (2) fuel development; (3) corrosion loop tests and analysis; (4) thermal-hydraulic loop tests; (5) reactor control and shutdown concepts; (6) critical and subcritical experiments; (7) material data, structure tests, and analysis; (8) cold source development; (9) beam tube, guide, and instrument development; (10) neutron transport and shielding; (11) I and C research and development; and (12) facility concepts

  20. Upgradation of Apsara reactor

    International Nuclear Information System (INIS)

    Mammen, S.; Mukherjee, P.; Bhatnagar, A.; Sasidharan, K.; Raina, V.K.

    2009-01-01

    Apsara is a 1 MW swimming pool type research reactor using high enriched uranium as fuel with light water as coolant and moderator. The reactor is in operation for more than five decades and has been extensively used for basic research, radioisotope production, neutron radiography, detector testing, shielding experiments etc. In view of its long service period, it is planned to carry out refurbishment of the reactor to extend its useful life. During refurbishment, it is also planned to upgrade the reactor to a 2 MW reactor to improve its utilization and to upgrade the structure, system and components in line with the current safety standards. This paper gives a brief account of the design features and safety aspects of the upgraded Apsara reactor. (author)

  1. IGORR 1: Proceedings of the 1. meeting of the International Group On Research Reactors

    Energy Technology Data Exchange (ETDEWEB)

    West, C D [comp.

    1990-05-01

    Descriptions of the ongoing projects presented at this Meeting were concerned with: New Research Reactor FRM-II at Munich; MITR-II reactor; The Advanced. Neutron Source (ANS) Project; The high Flux Reactor Petten, Status and Prospects; The High Flux Beam Reactor Instrumentation Upgrade; BER-II Upgrade; The BR2 Materials Testing Reactor Past, Ongoing and Under-Study Upgrades; The ORPHEE, Reactor Current Status and Proposed Enhancement of Experimental Variabilities; Construction of the Upgraded JRR-3; Status of the University of Missouri-Columbia Research Reactor Upgrade; the Reactor and Cold Neutron Facility at NIST; Upgrade of Materials Irradiation Facilities in HFIR; Backfitting of the FRG Reactors; University Research Reactors in the United States; and Organization of the ITER Project - Sharing of Informational Procurements. Topics of interest were: Thermal-hydraulic tests and correlations, Corrosion tests and analytical models , Multidimensional kinetic analysis for small cores, Fuel plates fabrication, Fuel plates stability, Fuel irradiation, Burnable poison irradiation, Structural materials irradiation, Neutron guides irradiation, Cold Source materials irradiation, Cold Source LN{sub 2} test, Source LH2-H{sub 2}O reaction (H or D), Instrumentation upgrading and digital control system, Man-machine interface.

  2. IGORR 1: Proceedings of the 1. meeting of the International Group On Research Reactors

    International Nuclear Information System (INIS)

    West, C.D.

    1990-05-01

    Descriptions of the ongoing projects presented at this Meeting were concerned with: New Research Reactor FRM-II at Munich; MITR-II reactor; The Advanced. Neutron Source (ANS) Project; The high Flux Reactor Petten, Status and Prospects; The High Flux Beam Reactor Instrumentation Upgrade; BER-II Upgrade; The BR2 Materials Testing Reactor Past, Ongoing and Under-Study Upgrades; The ORPHEE, Reactor Current Status and Proposed Enhancement of Experimental Variabilities; Construction of the Upgraded JRR-3; Status of the University of Missouri-Columbia Research Reactor Upgrade; the Reactor and Cold Neutron Facility at NIST; Upgrade of Materials Irradiation Facilities in HFIR; Backfitting of the FRG Reactors; University Research Reactors in the United States; and Organization of the ITER Project - Sharing of Informational Procurements. Topics of interest were: Thermal-hydraulic tests and correlations, Corrosion tests and analytical models , Multidimensional kinetic analysis for small cores, Fuel plates fabrication, Fuel plates stability, Fuel irradiation, Burnable poison irradiation, Structural materials irradiation, Neutron guides irradiation, Cold Source materials irradiation, Cold Source LN 2 test, Source LH2-H 2 O reaction (H or D), Instrumentation upgrading and digital control system, Man-machine interface

  3. Numerical analysis and optimisation of heavy water upgrading column

    International Nuclear Information System (INIS)

    Sankar, Rama; Ghosh, Brindaban; Bhanja, K.

    2013-01-01

    In the 'Pressurised Heavy Water' type of reactors, heavy water is used both as moderator and coolant. During operation of reactor downgraded heavy water is generated that needs to be upgraded for reuse in the reactor. When the isotopic purity of heavy water becomes less than 99.75%, it is termed as downgraded heavy water. Downgraded heavy water also contains impurity such as corrosion products, dirt, oil etc. Upgradation of downgraded heavy water is normally done in two steps: (i) Purification: In this step downgraded heavy water is first purified to remove corrosion products, dirt, oil, etc. and (ii) Upgradation of heavy water to increase its isotopic purity, this step is carried out by vacuum distillation of downgraded heavy water after purification. This project is aimed at mathematical modelling and numerical simulation of heavy water upgrading column. Modelling and simulation studies of the upgradation column are based on equilibrium stage model to evaluate the effect of feed location, pressure, feed composition, reflux ratio in the packed column for given reboiler and condenser duty of distillation column. State to stage modelling of two-phase two-component flow has constitutes the overall modelling of the column. The governing equations consist of stage-wise species and overall mass continuity and stage-wise energy balance. This results in tridigonal matrix equation for stage liquid fractions for heavy and light water. The stage-wise liquid flow rates and temperatures are governed by stage-wise mass and energy balance. The combined form of the corresponding governing equations, with the incorporation of thermodynamic equation of states, form a system of nonlinear equations. This system have been resolved numerically using modified Newton-Raphson method. A code in the MATLAB platform has been developed by on above numerical procedure. The optimisation of the column operating conditions is to be carried out based on parametric studies and analysis of different

  4. Measurements of ion mobility and GEM discharge studies for the upgrade of the ALICE time projection chamber

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00507268

    2018-02-20

    ALICE is one of the four experiments at the Large Hadron Collider (LHC). The quark-gluon plasma, which is predominantly produced in lead-lead collisions at LHC, is of particular interest for ALICE. After the long shut-down 2 (2019-2021) the LHC will provide lead-lead collisions at an increased interaction rate of 50 kHz. In order to examine every event at this interaction rate the ALICE Time Projection Chamber (TPC) needs to be upgraded. The TPC’s ReadOut Chambers (ROCs) are currently multi-wire proportional chambers. To prevent space charge build-up of slow ions, drifting from the ROCs into the TPC, a gating grid is used. The corresponding closure time imposes a dead time on the TPC read out, which prohibits data taking at a readout rate higher than 3 kHz. New ROCs have therefore been designed, relying on stacks of Gas Electron Multiplier (GEM) foils for the gas amplification, allowing for continuous readout. With the new ROCs, a certain fraction of ions will be drifting at all time into the TPC. Knowing t...

  5. Upgrade of the AGS H- linac

    International Nuclear Information System (INIS)

    Alessi, J.G.; Buxton, W.; Kponou, A.; LoDestro, V.; Mapes, M.; McNerney, A.J.; Raparia, D.

    1994-01-01

    The AGS linac presently accelerates 25 mA of H - to 200 MeV at a 5 Hz rep-rate and 500 μs pulse width. The Booster takes 4 pulses every 3.8 seconds, and the remaining pulses are used for isotope production. The authors are in the process of upgrading the linac to increase the average current delivered for isotope production by more than a factor of two, while at the same time expecting to decrease linac downtime. Various aspects of this upgrade are discussed, including the upgrade of the control system, new high power transmission line, transport line vacuum, and rf power supply system upgrades

  6. Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade

    CERN Document Server

    AUTHOR|(CDS)2071552; Aggleton, Robin Cameron; Baber, Mark David John; Barbieri, Richard Alexander; Belknap, Donald Austin; Berryhill, Jeffrey; Brooke, James John; Bundock, Aaron; Cali, Ivan Amos; Cepeda, Maria Luisa; Dasgupta, Sudeshna; da Silva, J.C; Dasu, Sridhara Rao; Durkin, Timothy John; Fobes, Robert William; Ghabrous Larrea, Carlos; Gorski, Thomas; Grimes, Mark; Guilbaud, Maxime; Guo, Z; Hall, Geoffrey; Harder, Kristian; Harper, Sam; Iles, Gregory Michiel; Innocenti, Gian Michele; Ives, Sarah Joanne; Jones, John; Kreis, Benjamin Jonah; Lee, Y; Li, W; Lucas, Christopher; Lucas, Robyn Elizabeth; Marrouche, Jad; Newbold, David; Northup, Michael; Oljavo, I; Paramesvaran, Sudarshan; Rivera, Ryan Allen; Roland, Christof; Rose, A; Sankey, D; Smith, Wesley; Svetek, Ales; Tapper, Alexander; Thea, Alessandro; Tikalsky, Jesra Lilah; Uplegger, Lorenzo; Vicente, Marcelo; Williams, Thomas Stephen; Wyslouch, Boleslaw

    2016-01-01

    The Compact Muon Solenoid (CMS) experiment is currently installing upgrades to their Calorimeter Trigger for LHC Run 2 to ensure that the trigger thresholds can stay low, and physics data collection will not be compromised. The electronics will be upgraded in two stages. Stage-1 for 2015 will upgrade some electronics and links from copper to optical in the existing calorimeter trigger so that the algorithms can be improved and we do not lose valuable data before stage-2 can be fully installed by 2016. Stage-2 will fully replace the calorimeter trigger at CMS with a micro-TCA and optical link system. It requires that the updates to the calorimeter back-ends, the source of the trigger primitives, be completed. The new systemâ??s boards will utilize Xilinx Virtex-7 FPGAs and have hundreds of high-speed links operating at up to 10 Gbps to maximize data throughput. The integration, commissioning, and installation of stage-1 in 2015 will be described, as well as the integration and parallel installation of th...

  7. High flux isotope reactor cold source preconceptual design study report

    International Nuclear Information System (INIS)

    Selby, D.L.; Bucholz, J.A.; Burnette, S.E.

    1995-12-01

    In February 1995, the deputy director of Oak Ridge National Laboratory (ORNL) formed a group to examine the need for upgrades to the High Flux Isotope Reactor (HFIR) system in light of the cancellation of the Advanced Neutron Source Project. One of the major findings of this study was that there was an immediate need for the installation of a cold neutron source facility in the HFIR complex. The anticipated cold source will consist of a cryogenic LH 2 moderator plug, a cryogenic pump system, a refrigerator that uses helium gas as a refrigerant, a heat exchanger to interface the refrigerant with the hydrogen loop, liquid hydrogen transfer lines, a gas handling system that includes vacuum lines, and an instrumentation and control system to provide constant system status monitoring and to maintain system stability. The scope of this project includes the development, design, safety analysis, procurement/fabrication, testing, and installation of all of the components necessary to produce a working cold source within an existing HFIR beam tube. This project will also include those activities necessary to transport the cold neutron beam to the front face of the present HFIR beam room. The cold source project has been divided into four phases: (1) preconceptual, (2) conceptual design and research and development (R and D), (3) detailed design and procurement, and (4) installation and operation. This report marks the conclusion of the preconceptual phase and establishes the concept feasibility. The information presented includes the project scope, the preliminary design requirements, the preliminary cost and schedule, the preliminary performance data, and an outline of the various plans for completing the project

  8. Vermont Yankee simulator BOP model upgrade

    International Nuclear Information System (INIS)

    Alejandro, R.; Udbinac, M.J.

    2006-01-01

    The Vermont Yankee simulator has undergone significant changes in the 20 years since the original order was placed. After the move from the original Unix to MS Windows environment, and upgrade to the latest version of SimPort, now called MASTER, the platform was set for an overhaul and replacement of major plant system models. Over a period of a few months, the VY simulator team, in partnership with WSC engineers, replaced outdated legacy models of the main steam, condenser, condensate, circulating water, feedwater and feedwater heaters, and main turbine and auxiliaries. The timing was ideal, as the plant was undergoing a power up-rate, so the opportunity was taken to replace the legacy models with industry-leading, true on-line object oriented graphical models. Due to the efficiency of design and ease of use of the MASTER tools, VY staff performed the majority of the modeling work themselves with great success, with only occasional assistance from WSC, in a relatively short time-period, despite having to maintain all of their 'regular' simulator maintenance responsibilities. This paper will provide a more detailed view of the VY simulator, including how it is used and how it has benefited from the enhancements and upgrades implemented during the project. (author)

  9. Upgrading elastomer seals for nuclear service

    Energy Technology Data Exchange (ETDEWEB)

    Wittich, K C; Wensel, R; LaRose, R; Kuran, S

    1995-06-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussions with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author). 2 refs., 6 figs.

  10. Upgrading elastomer seals for nuclear service

    International Nuclear Information System (INIS)

    Wittich, K.C.; Wensel, R.; LaRose, R.; Kuran, S.

    1995-06-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussions with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author). 2 refs., 6 figs

  11. Upgrading elastomer seals for nuclear service

    International Nuclear Information System (INIS)

    Wittich, K.C.; Wensel, R.; Larose, R.; Kuran, S.

    1998-01-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussion with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author)

  12. Biogas Upgrading and Waste-to-Energy | Bioenergy | NREL

    Science.gov (United States)

    Biogas Upgrading and Waste-to-Energy Biogas Upgrading and Waste-to-Energy NREL's waste-to-energy research and development required for upgrading biogas to fuels and high-value co-products. Featured (2014) Biogas Potential in the United States, NREL Fact Sheet (2013) View all NREL biogas upgrading and

  13. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  14. Optics and lattice optimizations for the LHC upgrade project

    CERN Document Server

    Holzer, B; Chance, A; Dalena, B; Payet, J; Bogomyagkov, A; Appleby, R; Korostelev, M; Hock, K; Wolski, A; Milardi, C; Faus-Golfe, A; Resta, J

    2012-01-01

    The luminosity upgrade of the LHC collider at CERN is based on a strong focusing scheme to reach lowest values of the beta function at the collision points. Several issues have to be addressed in this context, that are considered as mid term goals for the optimisation of the lattice and beam optics: Firstly a number of beam optics have been developed to establish a baseline for the hardware R&D, and that will define the specifications for the new magnets that will be needed, in Nb$_{3}$Sn as well as in NbTi technology. Secondly, the need for sufficient flexibility of the beam optics especially for smallest β * values, the need for a smooth transition between the injection and the collision optics, the comparison of the optics performance between flat and round beams and finally different ways to optimise the chromatic correction, including the study of local correction schemes. This paper presents the status of this work, which is a result of an international collaboration, and summarises the main parame...

  15. The ATLAS SCT: Commissioning Experience and SLHC Upgrade

    OpenAIRE

    Mitrevski, J

    2008-01-01

    The ATLAS Semiconductor Tracker (SCT) has been installed, and fully connected to electrical, optical and cooling services. Commissioning has been performed both with calibration data and cosmic ray events. The cosmics were used to align the detector, measure the hit efficiency and set the timing. The SCT is now ready to take data when the LHC turns on this autumn. At the same time, it is clear that the present ATLAS tracker will need to be renewed for projected luminosity upgrade of the LHC, ...

  16. The SAMI2 Open Source Project

    Science.gov (United States)

    Huba, J. D.; Joyce, G.

    2001-05-01

    In the past decade, the Open Source Model for software development has gained popularity and has had numerous major achievements: emacs, Linux, the Gimp, and Python, to name a few. The basic idea is to provide the source code of the model or application, a tutorial on its use, and a feedback mechanism with the community so that the model can be tested, improved, and archived. Given the success of the Open Source Model, we believe it may prove valuable in the development of scientific research codes. With this in mind, we are `Open Sourcing' the low to mid-latitude ionospheric model that has recently been developed at the Naval Research Laboratory: SAMI2 (Sami2 is Another Model of the Ionosphere). The model is comprehensive and uses modern numerical techniques. The structure and design of SAMI2 make it relatively easy to understand and modify: the numerical algorithms are simple and direct, and the code is reasonably well-written. Furthermore, SAMI2 is designed to run on personal computers; prohibitive computational resources are not necessary, thereby making the model accessible and usable by virtually all researchers. For these reasons, SAMI2 is an excellent candidate to explore and test the open source modeling paradigm in space physics research. We will discuss various topics associated with this project. Research supported by the Office of Naval Research.

  17. Upgrade of the cryogenic infrastructure of SM18, CERN main test facility for superconducting magnets and RF cavities

    Science.gov (United States)

    Perin, A.; Dhalla, F.; Gayet, P.; Serio, L.

    2017-12-01

    SM18 is CERN main facility for testing superconducting accelerator magnets and superconducting RF cavities. Its cryogenic infrastructure will have to be significantly upgraded in the coming years, starting in 2019, to meet the testing requirements for the LHC High Luminosity project and for the R&D program for superconducting magnets and RF equipment until 2023 and beyond. This article presents the assessment of the cryogenic needs based on the foreseen test program and on past testing experience. The current configuration of the cryogenic infrastructure is presented and several possible upgrade scenarios are discussed. The chosen upgrade configuration is then described and the characteristics of the main newly required cryogenic equipment, in particular a new 35 g/s helium liquefier, are presented. The upgrade implementation strategy and plan to meet the required schedule are then described.

  18. Catalytic cracking of the top phase fraction of bio-oil into upgraded liquid oil

    International Nuclear Information System (INIS)

    Sunarno; Rochmadi,; Mulyono, Panut; Budiman, Arief

    2016-01-01

    The energy consumption is increasing, while oil reserves as a primary energy resource are decreasing, so that is the reason seeking alternative energy source is inevitable. Biomass especially oil palm empty fruit bunches (EFB) which is abundant in Indonesia can be processed into bio-oil by pyrolysis process. The potential for direct substitution of bio-oil for petroleum may be limited due to the high viscosity, high oxygen content, low heating value, and corrosiveness. Consequently, upgrading of the bio-oil before use is inevitable to give a wider variety of applications of its liquid product. Furthermore, upgrading process to improve the quality of bio-oil by reduction of oxygenates involves process such as catalytic cracking. The objective of this research is to study the effect of operation temperature on yield and composition of upgraded liquid oil and to determine physical properties. Bio-oil derived from EFB was upgraded through catalytic cracking using series tubular reactor under atmospheric pressure on a silica-alumina catalyst. Results show that increasing temperature from 450 to 600 °C, resulting in decreasing of upgraded liquid oil (ULO) yield, decreasing viscosity and density of ULO, but increasing in calorimetric value of ULO. The increasing temperature of cracking also will increase the concentration of gasoline and kerosene in ULO.

  19. Catalytic cracking of the top phase fraction of bio-oil into upgraded liquid oil

    Energy Technology Data Exchange (ETDEWEB)

    Sunarno [Chemical Engineering Department, Riau University, Kampus Binawidya KM 12,5 Pekanbaru 28293 (Indonesia); Chemical Engineering Department, Gadjah Mada University, Jalan Grafika No. 2 Bulaksumur,Yogyakarta 55281 (Indonesia); Rochmadi,; Mulyono, Panut [Chemical Engineering Department, Gadjah Mada University, Jalan Grafika No. 2 Bulaksumur,Yogyakarta 55281 (Indonesia); Budiman, Arief, E-mail: abudiman@ugm.ac.id [Chemical Engineering Department, Gadjah Mada University, Jalan Grafika No. 2 Bulaksumur,Yogyakarta 55281(Indonesia); Center for Energy Studies, Gadjah Mada University, Sekip K1A, Yogyakarta 55281 (Indonesia)

    2016-06-03

    The energy consumption is increasing, while oil reserves as a primary energy resource are decreasing, so that is the reason seeking alternative energy source is inevitable. Biomass especially oil palm empty fruit bunches (EFB) which is abundant in Indonesia can be processed into bio-oil by pyrolysis process. The potential for direct substitution of bio-oil for petroleum may be limited due to the high viscosity, high oxygen content, low heating value, and corrosiveness. Consequently, upgrading of the bio-oil before use is inevitable to give a wider variety of applications of its liquid product. Furthermore, upgrading process to improve the quality of bio-oil by reduction of oxygenates involves process such as catalytic cracking. The objective of this research is to study the effect of operation temperature on yield and composition of upgraded liquid oil and to determine physical properties. Bio-oil derived from EFB was upgraded through catalytic cracking using series tubular reactor under atmospheric pressure on a silica-alumina catalyst. Results show that increasing temperature from 450 to 600 °C, resulting in decreasing of upgraded liquid oil (ULO) yield, decreasing viscosity and density of ULO, but increasing in calorimetric value of ULO. The increasing temperature of cracking also will increase the concentration of gasoline and kerosene in ULO.

  20. The ugly twins: Failed global sourcing projects and their substitutes

    NARCIS (Netherlands)

    Schiele, Holger; Horn, Philipp; Horn, Philipp; Werner, Welf

    2010-01-01

    Purpose of the paper and literature addressed: Analyzing the impact of failed global sourcing projects on the entire commodity group and exploring isomorphism as potential antecedent to the observed phenomenon. The paper is embedded in the global sourcing literature, as well as isomorphism and total

  1. Project specific quality assurance plan for Project W-178, 219-S secondary containment

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design, procurement and construction of the 219-S Secondary Containment Upgrade. The reviews and verifications will be on activities associated with design, procurement, and construction of the Secondary Containment Upgrade which includes, but is not limited to demolition, removal, new tank installation, tank 103 isolation, tank cell refurbishment, electrical, instrumentation, piping/tubing including supports, pump and valves, and special coatings. The full project scope is defined in the project Functional Design Criteria (FDC), SD-W178-FDC-001, and all activities must be in compliance with this FDC and related design documentation

  2. LHCB : The upgraded LHCb RICH detector: status and perspectives

    CERN Multimedia

    Cardinale, Roberta

    2015-01-01

    The LHCb experiment is designed to perform high-precision measurements of CP violation and search for New Physics using the enormous flux of beauty and charmed hadrons produced at the Large Hadron Collider (LHC). The two RICH detectors installed in LHCb have performed successfully during the 2010-2012 data taking period. The data from these detectors were essential to most of the physics results published by LHCb. In order to extend its potential for discovery and study of new phenomena it is planned to upgrade the LHCb experiment in 2018 with a 40MHz readout and a much more flexible software-based triggering system. This would increase the readout rate and occupancies for the RICH detectors. The RICH detector will require new photon detectors and modifications of the optics of the upstream RICH detector. Tests of the complete opto-electronic chain have been performed during testbeam sessions in autumn 2014. The status and perspectives of the RICH upgrade project will be presented.

  3. The payloads of Advanced Virgo: current status and upgrades

    Science.gov (United States)

    Naticchioni, L.; Virgo Collaboration

    2018-02-01

    The development and integration of new detector payloads has been an important part of the Advanced Virgo (AdV) project, the major upgrade of the Virgo interferometric detector of Gravitational Waves, aiming to increase the detector sensitivity by one order of magnitude. During the integration phase of the new AdV payloads with monolithic suspension of mirrors we experienced systematic suspension failures later identified as caused by dust contamination of the vacuum system. In order to not postpone the detector commissioning, making possible to join the LIGO O2 observation run, the Collaboration decided to proceed with the integration of the payloads relying on steel wire suspensions for all the mirrors. In this proceeding the status of the currently integrated payloads is reported, including their angular control characterization and the Q-factor measurements for test mass steel wire suspensions. The payload upgrade for the re-integration of monolithic suspensions after the O2 run is reported in the last section.

  4. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Carrio, F; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. Its main upgrade will occur for the High Luminosity LHC phase (phase 2) where the luminosity will have increased 5-fold compared to the design luminosity (1034 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional luminosity increase by a factor of 2 can be achieved by luminosity leveling. This upgrade will probably happen around 2022. The upgrade aims at replacing the majority of the on- and off- detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. An ambitious upgrade development program is pursued studying different electronics options. Three different options are presently being investigated for the front-end electronic upgrade. Which one to u...

  5. Upgradation of an Apple IIe based DC arc atomic emission spectrometer to a PC based system

    International Nuclear Information System (INIS)

    Sampathkumar, R.; Ravindranath, S.V.G.; Patil, P.B.; Deshpande, S.S.; Saha, T.K.; Handu, V.K.

    2004-01-01

    The analysis of Uranium metal and its compounds used as reactor fuel for the presence of impurities especially Cd and B which have a high neutron capture cross section is routinely performed in Spectroscopy Division. The DC Arc Atomic Emission Spectrometer in the Division was employing an Apple IIe computer for performing the control and data acquisition jobs. The system was upgraded to a PC based data acquisition system and the necessary software to perform the spectro chemical analysis has been developed. This becomes necessary in a scenario where the commercially available Atomic Emission Spectrometers are no longer equipped with DC arc source. Also the Apple IIe computer which was performing the control and data acquisition has gone obsolete and its spares are no longer available. Therefore, to derive the benefits of using DC arc as excitation source the system was upgraded to a PC based system. This paper describes the upgraded system and the various software features relating to the mode of data acquisition, method of analysis, data processing etc. implemented as required by the analysts. (author)

  6. Upgrade trigger: Biannual performance update

    CERN Document Server

    Aaij, Roel; Couturier, Ben; Esen, Sevda; De Cian, Michel; De Vries, Jacco Andreas; Dziurda, Agnieszka; Fitzpatrick, Conor; Fontana, Marianna; Grillo, Lucia; Hasse, Christoph; Jones, Christopher Rob; Le Gac, Renaud; Matev, Rosen; Neufeld, Niko; Nikodem, Thomas; Polci, Francesco; Del Buono, Luigi; Quagliani, Renato; Schwemmer, Rainer; Seyfert, Paul; Stahl, Sascha; Szumlak, Tomasz; Vesterinen, Mika Anton; Wanczyk, Joanna; Williams, Mark Richard James; Yin, Hang; Zacharjasz, Emilia Anna

    2017-01-01

    This document presents the performance of the LHCb Upgrade trigger reconstruction sequence, incorporating changes to the underlying reconstruction algorithms and detector description since the Trigger and Online Upgrade TDR. An updated extrapolation is presented using the most recent example of an Event Filter Farm node.

  7. The Phase II Upgrade of the ATLAS Calorimeter

    CERN Document Server

    Tartarelli, Giuseppe Francesco; The ATLAS collaboration

    2017-01-01

    This presentation will show the status of the upgrade projects of the ATLAS calorimeter system for the high luminosity phase of the LHC (HL-LHC). For the HL-LHC, the instantaneous luminosity is expected to increase up to L ≃ 7.5 × 1034 cm−2 s−1 and the average pile-up up to 200 interactions per bunch crossing. The Liquid Argon (LAr) calorimeter electronics will need to be replaced to cope with these challenging conditions: the expected radiation doses will indeed exceed the qualification range of the current readout system, and the upgraded trigger system will require much longer data storage in the electronics (up to 60 us), that the current system cannot sustain. The status of the R&D of the low-power ASICs (pre-amplifier, shaper, ADC, serializer and transmitters) and of the readout electronics design will be discussed. Moreover, a High Granularity Timing Detector (HGTD) is proposed to be added in front of the LAr calorimeters in the end-cap region (2.4 <|eta|< 4.2) for pile-up mitigation a...

  8. CHRISGAS Project. WP13: Ancillary and Novel Processes. Final Report: Separation of Hydrogen with Membranes Combined with Water Gas Shift Reaction

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez-Hervas, J. M.; Marono, M.; Barreiro, M. M.

    2011-05-13

    Oxygen pressurized gasification of biomass out stands as a very promising approach to obtain energy or hydrogen from renewable sources. The technical feasibility of this technology has been investigated under the scope of the VI FP CHRISGAS project, which started in September 2004 and had a duration of five and a half years. The Division of Combustion and Gasification of CIEMAT participated in this project in Work Package 13: Ancillary and novel processes, studying innovative gas separation and gas upgrading systems. Such systems include novel or available high temperature water gas shift catalysts and commercially available membranes not yet tried in this type of atmosphere. This report describes the activities carried out during the project regarding the performance of high temperature water gas shift catalysts for upgrading of synthesis gas obtained from biomass gasification, the separation of H2 with selective membranes and the combination of both processes in one by means of a catalytic membrane reactor. (Author) 20 refs.

  9. CHRISGAS Project. WP13: Ancillary and Novel Processes. Final Report: Separation of Hydrogen with Membranes Combined with Water Gas Shift Reaction

    International Nuclear Information System (INIS)

    Sanchez-Hervas, J. M.; Marono, M.; Barreiro, M. M.

    2011-01-01

    Oxygen pressurized gasification of biomass out stands as a very promising approach to obtain energy or hydrogen from renewable sources. The technical feasibility of this technology has been investigated under the scope of the VI FP CHRISGAS project, which started in September 2004 and had a duration of five and a half years. The Division of Combustion and Gasification of CIEMAT participated in this project in Work Package 13: Ancillary and novel processes, studying innovative gas separation and gas upgrading systems. Such systems include novel or available high temperature water gas shift catalysts and commercially available membranes not yet tried in this type of atmosphere. This report describes the activities carried out during the project regarding the performance of high temperature water gas shift catalysts for upgrading of synthesis gas obtained from biomass gasification, the separation of H2 with selective membranes and the combination of both processes in one by means of a catalytic membrane reactor. (Author) 20 refs.

  10. Pulsed power supply for Nova Upgrade

    International Nuclear Information System (INIS)

    Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C.

    1992-01-01

    This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 μm light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps

  11. LHCb VELO Upgrade

    CERN Document Server

    Hennessy, Karol

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of $2\\times10^{33} \\mathrm{cm}^{-2}\\mathrm{s}^{-1}$. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have $55\\times55 \\mu m^{2}$ pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separate...

  12. Presentation plan of the reconstruction and upgrade hydroelectric power plant 'Zvornik'

    Directory of Open Access Journals (Sweden)

    Krstić Dušan B.

    2016-01-01

    Full Text Available By the basic project of the energy utilization of the middle part of the river Drina (from Višegrad to Zvornik building of five large hydroelectric power plants was planned. Hydroelectric power plant near Zvornik had the greatest advantage, and it is the first built. Hydroelectric power plant 'Zvornik' separates the river Drina, about 1 km upstream from Mali Zvornik in Serbia and Zvornik in Bosnia and Herzegovina. In order to extend the work life, by the urban development project was planned modernization of production aggregates and associated equipment, the upgrade of annexes above the aggregate siphons A1 and A2, as well as the upgrade of the annexes of the powerhouse on the right bank of the river in the function of accommodation of electrical equipment. By replacing of the vital parts of turbines with increasing diameter with an increase of efficiency, Bow and power, as well as replacing generators with new generator of higher power with excitation and all the necessary auxiliary equipment, will ensure reliable operation of the hydroelectric power plant and will extend the working life of the next 40 years, creating opportunities for retrofitting additional fifth unit.

  13. Improved discrete ordinate solutions in the presence of an anisotropically reflecting lower boundary: Upgrades of the DISORT computational tool

    International Nuclear Information System (INIS)

    Lin, Z.; Stamnes, S.; Jin, Z.; Laszlo, I.; Tsay, S.-C.; Wiscombe, W.J.; Stamnes, K.

    2015-01-01

    A successor version 3 of DISORT (DISORT3) is presented with important upgrades that improve the accuracy, efficiency, and stability of the algorithm. Compared with version 2 (DISORT2 released in 2000) these upgrades include (a) a redesigned BRDF computation that improves both speed and accuracy, (b) a revised treatment of the single scattering correction, and (c) additional efficiency and stability upgrades for beam sources. In DISORT3 the BRDF computation is improved in the following three ways: (i) the Fourier decomposition is prepared “off-line”, thus avoiding the repeated internal computations done in DISORT2; (ii) a large enough number of terms in the Fourier expansion of the BRDF is employed to guarantee accurate values of the expansion coefficients (default is 200 instead of 50 in DISORT2); (iii) in the post-processing step the reflection of the direct attenuated beam from the lower boundary is included resulting in a more accurate single scattering correction. These improvements in the treatment of the BRDF have led to improved accuracy and a several-fold increase in speed. In addition, the stability of beam sources has been improved by removing a singularity occurring when the cosine of the incident beam angle is too close to the reciprocal of any of the eigenvalues. The efficiency for beam sources has been further improved from reducing by a factor of 2 (compared to DISORT2) the dimension of the linear system of equations that must be solved to obtain the particular solutions, and by replacing the LINPAK routines used in DISORT2 by LAPACK 3.5 in DISORT3. These beam source stability and efficiency upgrades bring enhanced stability and an additional 5–7% improvement in speed. Numerical results are provided to demonstrate and quantify the improvements in accuracy and efficiency of DISORT3 compared to DISORT2. - Highlights: • We present a successor version 3 of DISORT (DISORT3) with important upgrades. • Redesigned BRDF computation improves both

  14. Options for the Delft advanced neutron source

    International Nuclear Information System (INIS)

    Gibcus, H.P.M.; Leege, P.F.A. de; Labohm, F.; Vries, J.W. de; Verkooijen, A.H.M.; Valko, J.; Feltes, W.; Heinecke, J.

    2003-01-01

    Results of feasibility studies are presented for options for an advanced neutron source for the Delft reactor including upgrading the HOR, a 2 MW pool-type research reactor at the Delft University of Technology. The primary utilisation of the HOR focuses on beam research applications with neutrons and positrons. The aim of being scientifically competitive in that research area requires a thermal neutron flux level of at least 1x10 14 n/cm 2 /s. The feasibility of an accelerator driven neutron source and upgrading the present core to a super compact core for reaching this goal has been investigated at large from a safety and operational point of view. For the upgraded core, a 3x3 fuel assembly arrangement and beryllium reflected at all sides was chosen. Figures on the system performance, including the merits of a cold neutron source application feeding the neutron guide system, are presented. (author)

  15. North Village Ground Source Heat Pump Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Redderson, Jeff

    2015-08-03

    This project demonstrated the feasibility of converting from a traditional direct exchange system to a ground source heat pump system on a large scale, multiple building apartment complex on a university campus. A total of ten apartment buildings were converted using vertical well fields and a ground source loop that connected the 24 apartments in each building into a common system. The system has yielded significant operational savings in both energy and maintenance and transformed the living environments of these residential buildings for our students.

  16. LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hennessy, Karol

    2017-02-11

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1}. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have 55×55 μm{sup 2} pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The foil will be manufactured through milling and possibly thinned further by chemical etching. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates. The current status of the VELO upgrade is described and latest results from operation of irradiated sensor assemblies are presented.

  17. LHCb Upgraded RICH 2 Engineering Design Review Report

    CERN Document Server

    Garsed, Philip John; Cardinale, Roberta; Petrolini, Alessandro; Benettoni, Massimo; Simi, Gabriele; Zago, M; Easo, Sajan; D'Ambrosio, Carmelo; Frei, Christoph; He, Jibo; Piedigrossi, Didier

    2016-01-01

    During the Long Shutdown 2 of the LHC, the LHCb experiment and, specifically, its two Ring Imaging Cherenkov (RICH) detectors will undergo a major upgrade. RICH 2 will be refurbished with new photon detectors and their associated electronics, with the capability of up to 40 MHz sustained acquisition rate. A new support and cooling system has been developed for the two photodetector arrays, retaining the vessel, gas and optical systems unchanged. This document describes their new mechanical arrangement, its engineering design, installation and alignment. A summary of the project schedule and Institute responsibilities is provided.

  18. Crowd-sourced Archaeological Research: The MicroPasts Project

    Directory of Open Access Journals (Sweden)

    Chiara Bonacchi

    2014-10-01

    Full Text Available This paper offers a brief introduction to MicroPasts, a web-enabled crowd-sourcing and crowd-funding project whose overall goal is to promote the collection and use of high quality research data via institutional and community collaborations, both on- and off-line. In addition to introducing this initiative, the discussion below is a reflection of its lead author’s core contribution to the project and will dwell in more detail on one particular aspect of MicroPasts: its relevance to research and practice in public archaeology, cultural policy and heritage studies.

  19. Least cost energy planning in Thailand:A case of biogas upgrading in palm oil industry

    Directory of Open Access Journals (Sweden)

    Artite Pattanapongchai

    2011-12-01

    Full Text Available Thailand is currently the world’s fourth largest producer of crude palm oil. The palm oil mill effluent is proposed to beused for biogas production. A value added option is then proposed by increasing thermal efficiency of the biogas by removingCO2 content and increasing the percentage of methane, consequently turning the biogas in to green gas. In this study, thebiogas and upgrading process for electricity generation with the subsidy or adder in the long term planning is presented. Thisanalysis uses the MARKAL-based least-cost energy system as an analytical tool. The objective of this study is to investigateupgrading biogas with a selected water scrubbing technique featuring least-cost energy planning. The co-benefit aspect ofbiogas and biogas upgrading project is analyzed by given an adder of 0.3 Baht/kWh. The target of total electricity generationfrom biogas is 60 MW in 2012. The result shows that green gas will account for approximately 44.91 million m3 in 2012 andincrease to 238.89 million m3 in 2030. The cumulative CO2 emission during 2012-2030 is 2,354.92 thousand tonnes of CO2.Results show that under the given adders the upgrading project is competitive with the conventional technologies in electricitygeneration planning.

  20. Proceedings of the 5. NCUT upgrading and refining conference 2009 : bitumen, synthetic crude oil and heavy oil

    International Nuclear Information System (INIS)

    2009-01-01

    This conference examined various upgrading technologies related to bitumen production. It provided a forum to review new developments to exploit oil sands bitumen and extra heavy crudes in terms of production, upgrading and environmental issues facing the industry. This 2009 conference focused on the many existing and emerging technical solutions that will help consolidate the position of the vast reserves in Western Canada as a sustainable source of crudes for North America and other selected markets. Some of the technical challenges that have an effect on upgrading include poor quality bitumen and heavy oils; bitumen and diluent blending; pipeline issues; desalting; fouling and corrosion; high costs; dependence on natural gas for energy; poor middle distillates; and greenhouse gas emissions. The sessions of the conference were entitled: heavy oil and bitumen upgrading technologies; secondary upgrading and refining technologies; bitumen transportation; and bitumen and heavy oil processability. The conference featured a total of 50 presentations and posters, of which 43 have been catalogued separately for inclusion in this database. tabs., figs

  1. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  2. Open Source Projects in Software Engineering Education: A Mapping Study

    Science.gov (United States)

    Nascimento, Debora M. C.; Almeida Bittencourt, Roberto; Chavez, Christina

    2015-01-01

    Context: It is common practice in academia to have students work with "toy" projects in software engineering (SE) courses. One way to make such courses more realistic and reduce the gap between academic courses and industry needs is getting students involved in open source projects (OSP) with faculty supervision. Objective: This study…

  3. OMEGA Upgrade preliminary design

    International Nuclear Information System (INIS)

    Craxton, R.S.

    1989-10-01

    The OMEGA laser system at the Laboratory for Laser Energetics of the University of Rochester is the only major facility in the United States capable of conducting fully diagnosed, direct-drive, spherical implosion experiments. As such, it serves as the national Laser Users Facility, benefiting scientists throughout the country. The University's participation in the National Inertial Confinement Fusion (ICF) program underwent review by a group of experts under the auspices of the National Academy of Sciences (the Happer Committee) in 1985. The Happer Committee recommended that the OMEGA laser be upgraded in energy to 30 kJ. To this end, Congress appropriated $4,000,000 for the preliminary design of the OMEGA Upgrade, spread across FY88 and FY89. This document describes the preliminary design of the OMEGA Upgrade. The proposed enhancements to the existing OMEGA facility will result in a 30-kHJ, 351-nm, 60-beam direct-drive system, with a versatile pulse-shaping facility and a 1%--2% uniformity of target drive. The Upgrade will allow scientists to explore the ignition-scaling regime, and to study target behavior that is hydrodynamically equivalent to that of targets appropriate for a laboratory microfusion facility (LMF). In addition, it will be possible to perform critical interaction experiments with large-scale-length uniformly irradiated plasmas

  4. Superconducting magnet development for the LHC upgrades

    International Nuclear Information System (INIS)

    Rossi, Lucio

    2012-01-01

    LHC is now delivering proton and heavy ion collisions at the highest energy. Upgrading the LHC beyond its design performance is a long term program that started during the LHC construction, with some fundamental R and D programs. The upgrade program is based on a vigorous superconductor and magnet R and D, aimed at increasing the field in accelerator magnets from 8 T to 12 T for the luminosity upgrade, with the scope of increasing the collider luminosity by a factor 5 to 10 from 2022. The upgrade program might continue with the LHC energy upgrade, which would require magnets producing field in the range of 16-20 T. The results obtained so far and the future challenges are discussed together with the possible plan to reach the goals. (author)

  5. Upgrade to the Tritium Remote Control and Monitoring System for TFTR D and D

    International Nuclear Information System (INIS)

    Sichta, P.; Oliaro, G.; Sengupta, S.

    2002-01-01

    Since 1988, the Tritium Remote Control and Monitoring System (TRECAMS) has performed crucial functions in support of D-T [deuterium-tritium] operations of the Tokamak Fusion Test Reactor (TFTR) at the Princeton Plasma Physics Laboratory (PPPL). Although plasma operations on TFTR were completed in 1997, the need for TRECAMS continued. During this period TRECAMS supported the TFTR tritium systems, the TFTR's Shutdown and Safing phase, and the TFTR Decontamination and Decommissioning (D and D) project. The most critical function of the TRECAMS in the post-TFTR era has been to provide a real-time indication of the airborne tritium levels in the tritium areas and the (HVAC) stacks. TRECAMS is a critical tool in conducting safe TFTR D and D tritium-line breaks and other tritium-related work activities. Beginning in 1998, the failure rate of the system's hardware sharply increased. Furthermore, the specialized knowledge required to maintain the original software and hardware was diminishing. It soon became apparent that a failure of the TRECAMS could significantly impact the TFTR D and D project's cost and schedule. To preclude this, the TRECAMS hardware and software was upgraded in the year 2000 to use modern components. This paper will describe that successful upgrade, including a review of the engineering processes and our operating experiences with the upgraded system

  6. DIII-D YPGRADE PROJECT FINAL REPORT FOR THE PERIOD OCTOBER 1, 1993 THROUGH MAY 31, 2003

    Energy Technology Data Exchange (ETDEWEB)

    STAMBAUGH, RD

    2003-06-01

    OAK-B135 Under DOE Contracts DE-AC03-89ER51114 and DE-AC03-99ER54463 to General Atomics (GA), three ''capital project'' upgrade projects were accomplished on DIII-D from FY93 to FY03 at a total GA cost of $27.2M. These projects included the Fast Wave Current Drive (FWCD) Upgrade ($8.2M), the Radiative Divertor Upgrade ($7.2M) and the Electron Cyclotron Heating (ECH) Upgrade ($11.8M). The ECH and FWCD upgrades provided DIII-D rf and microwave power for electron heating, driving plasma current, controlling the plasma current profile, controlling tearing mode instabilities, and modulated transport studies.The divertor provided adequate density and impurity control for high triangularity single null plasmas in the Advanced Tokamak (AT) Program and information for International Thermonuclear Experimental Reactor (ITER) divertor design. These upgrades provide the power and density control required to initiate the active control of advanced tokamak discharges, which is the key element in the DIII-D program.

  7. EN-CV during LS1: upgrade, consolidation, maintenance, operation

    International Nuclear Information System (INIS)

    Nonis, M.

    2012-01-01

    The Cooling and Ventilation (CV) Group in the Engineering Department (EN) will be heavily involved in several projects and activities during the long shutdown in 2013 and 2014 (LS1) within a time-frame limited to around twelve months. According to the requests received so far, most projects are related to the upgrade of users' equipment, consolidation work, and the construction of new plants. However, through the experience gained from the first years of the LHC run, some projects are also needed to adapt the existing installations to the new operating parameters. Some of these projects are presented hereafter, outlining the impact that they will have on operational working conditions or risks of breakdown. Among these projects we find: the PM32 raising pumps, the cooling of the CERN Control Center, R2E, the backup cooling towers for ATLAS and cryogenics, a thermosyphon for ATLAS, or new pumps in UWs. Finally, EN-CV activities during LS1 for maintenance, operation, and commissioning will be mentioned since they represent a major workload for the Group

  8. BPM STABILTIY STUDIES FOR THE APS MBA UPGRADE

    Energy Technology Data Exchange (ETDEWEB)

    Lill, R.; Sereno, N.; Yang, B.

    2017-03-25

    The Advanced Photon Source (APS) is currently in the preliminary design phase for the multi-bend achromat (MBA) lattice upgrade. Beam stability is critical for the MBA and will require long term drift defined as beam mo-tion over a seven-day timescale to be no more than 1 mi-cron at the insertion device locations and beam angle change no more than 0.25 micro-radian. Mechanical stabil-ity of beam position monitor (BPM) pickup electrodes mounted on insertion device vacuum chambers place a fun-damental limitation on long-term beam stability for inser-tion device beamlines. We present the design and imple-mentation of prototype mechanical motion system (MMS) instrumentation for quantifying this type of motion specif-ically in the APS accelerator tunnel and experiment hall floor under normal operating conditions. The MMS pres-ently provides critical position information on the vacuum chamber and BPM support systems. Initial results of the R&D prototype systems have demonstrated that the cham-ber movements far exceed the long-term drift tolerance specified for the APS Upgrade MBA storage ring.

  9. ELECTRON BEAM ION SOURCE PREINJECTOR PROJECT (EBIS) CONCEPTUAL DESIGN REPORT.

    Energy Technology Data Exchange (ETDEWEB)

    ALESSI, J.; BARTON, D.; BEEBE, E.; GASSNER, D.; GRANDINETTI, R.; HSEUH, H.; JAVIDFAR, A.; KPONOU, A.; LAMBIASE, R.; LESSARD, E.; LOCKEY, R.; LODESTRO, V.; MAPES, M.; MIRABELLA, D.; NEHRING, T.; OERTER, B.; PENDZICK, A.; PIKIN, A.; RAPARIA, D.; RITTER, J.; ROSER, T.; RUSSO, T.; SNYDSTRUP, L.; WILINSKI, M.; ZALTSMAN, A.; ZHANG, S.

    2005-09-01

    This report describes a new heavy ion pre-injector for the Relativistic Heavy Ion Collider (RHIC) based on a high charge state Electron Beam Ion Source (EBIS), a Radio Frequency Quadrupole (RFQ) accelerator, and a short Linear accelerator (Linac). The highly successful development of an EBIS at Brookhaven National Laboratory (BNL) now makes it possible to replace the present pre-injector that is based on an electrostatic Tandem with a reliable, low maintenance Linac-based pre-injector. Linac-based preinjectors are presently used at most accelerator and collider facilities with the exception of RHIC, where the required gold beam intensities could only be met with a Tandem until the recent EBIS development. EBIS produces high charge state ions directly, eliminating the need for the two stripping foils presently used with the Tandem. Unstable stripping efficiencies of these foils are a significant source of luminosity degradation in RHIC. The high reliability and flexibility of the new Linac-based pre-injector will lead to increased integrated luminosity at RHIC and is an essential component for the long-term success of the RHIC facility. This new pre-injector, based on an EBIS, also has the potential for significant future intensity increases and can produce heavy ion beams of all species including uranium beams and, as part of a future upgrade, might also be used to produce polarized {sup 3}He beams. These capabilities will be critical to the future luminosity upgrades and electron-ion collisions in RHIC. The proposed pre-injector system would also provide for a major enhancement in capability for the NASA Space Radiation Laboratory (NSRL), which utilizes heavy-ion beams from the RHIC complex. EBIS would allow for the acceleration of all important ion species for the NASA radiobiology program, such as, helium, argon, and neon which are unavailable with the present Tandem injector. In addition, the new system would allow for very rapid switching of ion species for

  10. Status of the National Synchrotron Light Source project

    International Nuclear Information System (INIS)

    Heese, R.N.

    1981-01-01

    The National Synchrotron Light Source is in its final stages of construction, and as the turn-on time for the 700 MeV vuv storage ring draws near, an overview of the project is presented. Emphasis is placed on the linac and booster synchrotron performance and the status of major subsystems

  11. Sources for charged particles; Les sources de particules chargees

    Energy Technology Data Exchange (ETDEWEB)

    Arianer, J.

    1997-09-01

    This document is a basic course on charged particle sources for post-graduate students and thematic schools on large facilities and accelerator physics. A simple but precise description of the creation and the emission of charged particles is presented. This course relies on every year upgraded reference documents. Following relevant topics are considered: electronic emission processes, technological and practical considerations on electron guns, positron sources, production of neutral atoms, ionization, plasma and discharge, different types of positive and negative ion sources, polarized particle sources, materials for the construction of ion sources, low energy beam production and transport. (N.T.).

  12. Prototype board development for the validation of the VMM ASICs for the New Small Wheel ATLAS upgrade project

    CERN Document Server

    Gkountoumis, Panagiotis; The ATLAS collaboration

    2018-01-01

    The VMM is a custom Application Specific Integrated Circuit (ASIC) which was designed to be used in the front-end readout electronics of both micromegas (MM) and small Thin Gap Chambers (sTGC) detectors of the New Small Wheel (NSW) Phase-I upgrade project of the ATLAS experiment. A new version of the VMM was recently fabricated and for that reason various prototype boards, the micromegas Front-End (MMFE1) and the General Purpose VMM (GPVMM), have been fabricated and extensively tested in order to validate the functionality of the ASIC. These boards use commercial Field Programmable Gate Arrays (FPGAs) for direct communication with computers which is achieved through 10/100/1000 Mbps Ethernet and UDP/IP protocols. The low noise performance of these boards gave the opportunity to be used in various test beams with micromegas detectors for validating the VMM and for performance studies of the sTGC detectors. A detailed description of the boards along with the results of the test beam and the detector studies wi...

  13. Prototype board development for the validation of the VMM ASICs for the New Small Wheel ATLAS upgrade project

    CERN Document Server

    Gkountoumis, Panagiotis; The ATLAS collaboration

    2018-01-01

    The VMM is a custom Application Specific Integrated Circuit (ASIC) which was designed to be used in the frontend readout electronics of both micromegas (MM) and small Thin Gap Chambers (sTGC) detectors of the New Small Wheel (NSW) Phase-I upgrade project of the ATLAS experiment. A new version of the VMM was recently fabricated and for that reason various prototype boards, the micromegas Front-End (MMFE1) and the General Purpose VMM (GPVMM), have been fabricated and extensively tested in order to validate the functionality of the ASIC. These boards use commercial Field Programmable Gate Arrays (FPGAs) for direct communication with computers which is achieved through 10=100=1000 Mbps Ethernet and UDP/IP protocols. The low noise performance of these boards gave the opportunity to be used in various test beams with micormegas detectors for validating the VMM and for performance studies of the sTGC detectors. A detailed description of the boards along with the results of the test beam and the detector studies will...

  14. Physical protection upgrades in Ukraine

    International Nuclear Information System (INIS)

    Djakov, A.

    1998-01-01

    The U.S. DOE is providing nuclear material safeguards assistance in both material control and accountability and in physical protection to several facilities in Ukraine. This paper summarizes the types of physical protection upgrades that have been or are presently being implemented at these facilities. These facilities include the Kiev Institute for Nuclear Research, Kharkov Institute of Physics and Technology, Sevastopol Institute of Nuclear Energy and Industry, and the South Ukraine Nuclear Power Plant. Typical upgrades include: hardening of storage areas; improvements in access control, intrusion detection, and CCTV assessment; central alarm station improvements; and implementation of new voice communication systems. Methods used to implement these upgrades and problems encountered are discussed. Training issues are also discussed

  15. TU-G-BRD-02: Automated Systematic Quality Assurance Program for Radiation Oncology Information System Upgrades

    International Nuclear Information System (INIS)

    Zhang, B; Yi, B; Eley, J; Mutaf, Y; Rahman, S; D’Souza, W

    2015-01-01

    Purpose: To: (1) describe an independent, automated, systematic software-based protocol for verifying clinical data accuracy/integrity for mitigation of data corruption/loss risks following radiation oncology information system (ROIS) upgrades; and (2) report on application of this approach in an academic/community practice environment. Methods: We propose a robust approach to perform quality assurance on the ROIS after an upgrade, targeting four data sources: (1) ROIS relational database; (2) ROIS DICOM interface; (3) ROIS treatment machine data configuration; and (4) ROIS-generated clinical reports. We investigated the database schema for differences between pre-/post-upgrade states. Paired DICOM data streams for the same object (such as RT-Plan/Treatment Record) were compared between pre-/post-upgrade states for data corruption. We examined machine configuration and related commissioning data files for changes and corruption. ROIS-generated treatment appointment and treatment parameter reports were compared to ensure patient encounter and treatment plan accuracy. This protocol was supplemented by an end-to-end clinical workflow test to verify essential ROI functionality and integrity of components interfaced during patient care chain of activities. We describe the implementation of this protocol during a Varian ARIA system upgrade at our clinic. Results: We verified 1,638 data tables with 2.4 billion data records. For 222 under-treatment patients, 605 DICOM RT plans and 13,480 DICOM treatment records retrieved from the ROIS DICOM interface were compared, with no differences in fractions, doses delivered, or treatment parameters. We identified 82 new data tables and 78 amended/deleted tables consistent with the upgrade. Reports for 5,073 patient encounters over a 2-week horizon were compared and were identical to those before the upgrade. Content in 12,237 xml machine files was compared, with no differences identified. Conclusion: An independent QA

  16. TU-G-BRD-02: Automated Systematic Quality Assurance Program for Radiation Oncology Information System Upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, B; Yi, B; Eley, J; Mutaf, Y; Rahman, S; D’Souza, W [University of Maryland School of Medicine, Baltimore, MD (United States)

    2015-06-15

    Purpose: To: (1) describe an independent, automated, systematic software-based protocol for verifying clinical data accuracy/integrity for mitigation of data corruption/loss risks following radiation oncology information system (ROIS) upgrades; and (2) report on application of this approach in an academic/community practice environment. Methods: We propose a robust approach to perform quality assurance on the ROIS after an upgrade, targeting four data sources: (1) ROIS relational database; (2) ROIS DICOM interface; (3) ROIS treatment machine data configuration; and (4) ROIS-generated clinical reports. We investigated the database schema for differences between pre-/post-upgrade states. Paired DICOM data streams for the same object (such as RT-Plan/Treatment Record) were compared between pre-/post-upgrade states for data corruption. We examined machine configuration and related commissioning data files for changes and corruption. ROIS-generated treatment appointment and treatment parameter reports were compared to ensure patient encounter and treatment plan accuracy. This protocol was supplemented by an end-to-end clinical workflow test to verify essential ROI functionality and integrity of components interfaced during patient care chain of activities. We describe the implementation of this protocol during a Varian ARIA system upgrade at our clinic. Results: We verified 1,638 data tables with 2.4 billion data records. For 222 under-treatment patients, 605 DICOM RT plans and 13,480 DICOM treatment records retrieved from the ROIS DICOM interface were compared, with no differences in fractions, doses delivered, or treatment parameters. We identified 82 new data tables and 78 amended/deleted tables consistent with the upgrade. Reports for 5,073 patient encounters over a 2-week horizon were compared and were identical to those before the upgrade. Content in 12,237 xml machine files was compared, with no differences identified. Conclusion: An independent QA

  17. Refurbishing tritium contaminated ion sources

    International Nuclear Information System (INIS)

    Wright, K.E.; Carnevale, R.H.; McCormack, B.E.; Stevenson, T.; Halle, A. von

    1995-01-01

    Extended tritium experimentation on TFTR has necessitated refurbishing Neutral Beam Long Pulse Ion Sources (LPIS) which developed operational difficulties, both in the TFTR Test Cell and later, in the NB Source Refurbishment Shop. Shipping contaminated sources off-site for repair was not permissible from a transport and safety perspective. Therefore, the NB source repair facility was upgraded by relocating fixtures, tooling, test apparatus, and three-axis coordinate measuring equipment; purchasing and fabricating fume hoods; installing exhaust vents; and providing a controlled negative pressure environment in the source degreaser/decon area. Appropriate air flow monitors, pressure indicators, tritium detectors and safety alarms were also included. The effectiveness of various decontamination methods was explored while the activation was monitored. Procedures and methods were developed to permit complete disassembly and rebuild of an ion source while continuously exhausting the internal volume to the TFTR Stack to avoid concentrations of tritium from outgassing and minimize personnel exposure. This paper presents upgrades made to the LPIS repair facility, various repair tasks performed, and discusses the effectiveness of the decontamination processes utilized

  18. Upgrading of the AMS facility at the Koffler 14UD Pelletron accelerator

    CERN Document Server

    Berkovits, D; Bordeanu, C; Ghelberg, S; Hass, M; Heber, O; Paul, M; Shahar, Y; Verri, G; 10.1016/j.nimb.2004.04.033

    2004-01-01

    The AMS facility based on a 14UD Pelletron tandem accelerator has been upgraded in recent years to support an active and diversified research program. A new dedicated AMS ion source beam line merging at 45 degrees with the existing injection line through a 45 degrees electrostatic deflector is in operation. The multi-sample high- intensity Cs sputter ion source stands on a separate 120 kV platform and is remote-controlled through a hybrid infrared-fiber-optics link operated either manually or by the accelerator-control computer, ensuring safe and reliable operation. Independent current preamplifiers are used in Faraday cup current readings down to the pA range. The accelerator computer-control system was upgraded to Lab View 6.1, allowing a PC server to control and read out all hardware components while one or more remote PC clients run the AMS software. Ad hoc sequences of commands, written in a script macro language, are run from a client computer to perform an automated AMS measurement. The present capabil...

  19. Mega-science accelerator projects in China and their impact on economy

    International Nuclear Information System (INIS)

    Zhang Chuang

    2012-01-01

    Along with the rapid development of national economy in China, a number of mega-science projects have been or being constructed. In respect to the large accelerator-based projects, the Beijing Electron-Positron Colliders (BEPC) and its upgrading project BEPCⅡ, the Hefei Light Source (HLS), the Heavy Ion Research Facility in Lanzhou (HIRFL) and its Cooling Storage Rings (HIRFL-CSR) and the Shanghai Synchrotron Radiation Facility (SSRF) were successfully constructed and put into operation. The Beijing Radioactive Ion Facility (BRIF) and the China Spallation Neutron Source (CSNS) are under construction. A particle accelerator is an integration of many HI-tech components. In order to reach the scientific goal of an accelerator project, a great deal new technologies need to be developed during its construction and operation and thus speed up technology development and this will positively impact on the economy. In this paper, the mega-science accelerator projects are briefly described and applications of accelerators in the economy are reviewed. The paper emphasizes spin-off of the accelerator technology developed during R and D and construction of the projects. Approaches of collaboration between academia and industry are discussed. With some examples, the benefits experienced in the laboratory-industry collaboration and approach of its economic compact are illustrated. (author)

  20. The JLab 12 GeV Energy Upgrade of CEBAF for QCD and Hadronic Physics

    International Nuclear Information System (INIS)

    Lawrence Cardman; Leigh Harwood

    2007-01-01

    CEBAF at Jefferson Lab is a 5-pass, recirculating cw electron linac operating at ∼6 GeV and devoted to basic research in nuclear physics. The 12 GeV Upgrade is a major project, sponsored by the DOE Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. We anticipate that the project will receive Critical Decision 2 approval this year and begin construction in 2008. The research program motivating the Upgrade includes: the study of hybrid mesons, which involve excited states of the glue, to explore the nature of quark confinement; dramatic improvements in our understanding of the QCD structure of the hadrons through the extension of our knowledge of their parton distribution functions to high xBjorken, where they are dominated by underlying valence quark structure, and a program of nucleon ''tomography'' via measurements of the Generalized Parton Distributions (GPDs), a broad program of experiments in the physics of nuclei that aims to understand the QCD basis for the nucleon-nucleon force and how nucleons and mesons arise as an approximation to the underlying quark-gluon structure; and precision tests of the Standard Model through parity violating deep inelastic and Moeller scattering. The Upgrade includes: doubling the accelerating voltages of the linacs by adding 10 new high-performance cryomodules; the requisite expansion of the 2K cryogenics plant and rf power systems to support these cryomodules; upgrading the beam transport system from 6 to 12 GeV through extensive re-use and/or modification of existing hardware; and the addition of one recirculation arc, a new experimental area, and the beamline to it; and the construction of major new experimental equipment for the GPD, high-xBjorken, and hybrid meson programs. The presentation will describe the science briefly and provide some details about the accelerator plans

  1. Design upgrade of the ISOLDE target unit for HIE-ISOLDE

    CERN Document Server

    Montano, J; Gottberg, A

    2013-01-01

    The High Intensity and Energy HIE-ISOLDE project is a major upgrade of the existing ISOLDE and REX-ISOLDE facilities with the objective of increasing the energy and the intensity of the delivered radioactive ion beams (RIB) {[}1]. In order to accommodate the future increase of primary beam intensity delivered by the new LINAC4 H- driver to the Proton Synchrotron Booster (PSB) {[}2] and from this to ISOLDE, a major study is being carried out to upgrade the existing designs of the ISOLDE target and its supporting infrastructure. In particular, the extraction optics plays an important role in the initial beam transport and the quality of the beam supplied to the mass separators. Important factors include the emittance of the beam and the beam profile to avoid beam losses. A new double electrode extraction system has been developed for simplifying and improving the interface between the target unit and the frontend (target coupling table). Numerical and experimental studies have been performed in order to define ...

  2. Upgrading Probability via Fractions of Events

    Directory of Open Access Journals (Sweden)

    Frič Roman

    2016-08-01

    Full Text Available The influence of “Grundbegriffe” by A. N. Kolmogorov (published in 1933 on education in the area of probability and its impact on research in stochastics cannot be overestimated. We would like to point out three aspects of the classical probability theory “calling for” an upgrade: (i classical random events are black-and-white (Boolean; (ii classical random variables do not model quantum phenomena; (iii basic maps (probability measures and observables { dual maps to random variables have very different “mathematical nature”. Accordingly, we propose an upgraded probability theory based on Łukasiewicz operations (multivalued logic on events, elementary category theory, and covering the classical probability theory as a special case. The upgrade can be compared to replacing calculations with integers by calculations with rational (and real numbers. Namely, to avoid the three objections, we embed the classical (Boolean random events (represented by the f0; 1g-valued indicator functions of sets into upgraded random events (represented by measurable {0; 1}-valued functions, the minimal domain of probability containing “fractions” of classical random events, and we upgrade the notions of probability measure and random variable.

  3. A brief account of Kozloduy 6 full-scope replica control room simulator upgrade experience: An engineering point of view

    International Nuclear Information System (INIS)

    Dinkov, Y.D.

    2006-01-01

    A short excursion throughout Kozloduy NPP history, and Kozloduy 6 Full-Scope Replica Control Room Simulator procurement, is proposed for a reader, which is not familiar with the Kozloduy circumstances. A brief account of five year operation and upgrade experience is presented as seen by the Kozloduy simulator engineering team. During the last five years Kozloduy 6 is going through a complex and expensive modernization programme so Simulator is a subject of a series of changes twice per year. Simulator is used for training six months of the year during spring and autumn most of this time in two shifts daily. Remaining six months during winter and summer are allocated to other simulator uses including five months downtime for hardware reconstruction, software integration, troubleshooting and testing. Quantitative information concerning scope of software and hardware changes is given. Kozloduy NPP simulator engineering team approach toward various upgrade projects is given in an attempt to facilitate a discussion about how a simulator upgrade should be performed. Projects mentioned vary from small to big, in-house or contracted, already completed or planned for future realization

  4. System and process for upgrading hydrocarbons

    Science.gov (United States)

    Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.

    2015-08-25

    In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.

  5. CANDU Digital Control Computer upgrade options

    International Nuclear Information System (INIS)

    De Jong, M.S.; De Grosbois, J.; Qian, T.

    1997-01-01

    This paper reviews the evolution of Digital Control Computers (DCC) in CANDU power plants to the present day. Much of this evolution has been to meeting changing control or display requirements as well as the replacement of obsolete, or old and less reliable technology with better equipment that is now available. The current work at AECL and Canadian utilities to investigate DCC upgrade options, alternatives, and strategies are examined. The dependence of a particular upgrade strategy on the overall plant refurbishment plans are also discussed. Presently, the upgrade options range from replacement of individual obsolete system components, to replacement of the entire DCC hardware without changing the software, to complete replacement of the DCCs with a functionally equivalent system using new control computer equipment and software. Key issues, constraints and objectives associated with these DCC upgrade options are highlighted. (author)

  6. Upgrades, Current Capabilities and Near-Term Plans of the NASA ARC Mars Climate

    Science.gov (United States)

    Hollingsworth, J. L.; Kahre, Melinda April; Haberle, Robert M.; Schaeffer, James R.

    2012-01-01

    We describe and review recent upgrades to the ARC Mars climate modeling framework, in particular, with regards to physical parameterizations (i.e., testing, implementation, modularization and documentation); the current climate modeling capabilities; selected research topics regarding current/past climates; and then, our near-term plans related to the NASA ARC Mars general circulation modeling (GCM) project.

  7. PSI: Upgrading

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The accelerator complex at the Paul Scherrer Institute in Villigen near Zurich (PSI - formed in 1988 by combining the Federal Institute for Reactor Research and the Swiss Institute for Nuclear Research) is in the throes of a major and lengthy upgrade

  8. PSI: Upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1992-09-15

    The accelerator complex at the Paul Scherrer Institute in Villigen near Zurich (PSI - formed in 1988 by combining the Federal Institute for Reactor Research and the Swiss Institute for Nuclear Research) is in the throes of a major and lengthy upgrade.

  9. Review of current and proposed reactor upgrades

    International Nuclear Information System (INIS)

    Moon, R.M.

    1985-01-01

    In an effort to foresee the future health of neutron scattering, a survey of plans to upgrade reactors and associated experimental facilities was undertaken. The results indicate that we are now entering a period characterized by a substantial reinvestment in reactor sources and expansion in the number of neutron scattering instruments. For the group of institutions participating in this survey there will be a total investment in improved sources and experimental facilities of $500 M to $1,000 M over the next decade. This investment will result in a 30 to 40% increase in the total power of research reactors and an increase of 30 to 50% in the number of neutron scattering instruments. It is therefore reasonable to anticipate an approximate doubling in the number of reactor neutrons incident on samples in the mid 90s compared to the present

  10. Status of the ALICE TPC upgrade for high-rate operation

    Energy Technology Data Exchange (ETDEWEB)

    Gasik, Piotr [TU Muenchen, Physik Department E12, Excellence Cluster ' ' Universe' ' , D-85748, Garching (Germany); Collaboration: ALICE-Collaboration

    2015-07-01

    A large Time Projection Chamber (TPC) is the main device for tracking and charged particle identification in the ALICE experiment at the CERN LHC. After the second long shutdown in 2018/2019, the LHC will deliver Pb beams colliding at an interaction rate of about 50 kHz, which is about a factor of 100 above the present readout rate of the TPC. This will result in a significant improvement on the sensitivity of rare probes that are considered key observables to characterise the hot and dense QCD matter created in such collisions. In order to make full use of this luminosity, a major upgrade of the TPC is required. It is foreseen to replace the existing MWPC-based readout chambers by Gas Electron Multiplier (GEM) detectors to overcome the rate limitations imposed by the present gated readout scheme. An extensive R and D program has been launched to reach the challenging requirements of the upcoming upgrade of the detector. In this presentation the most recent results are discussed concerning ion backflow suppression, gain stability, energy and dE/dx resolution and stability against discharges. The status of the upgrade of the online calibration and data reduction system, which includes advanced techniques for online corrections of space-charge distortions, as well as the development of a new readout electronics are reported.

  11. Flowsheets and source terms for radioactive waste projections

    International Nuclear Information System (INIS)

    Forsberg, C.W.

    1985-03-01

    Flowsheets and source terms used to generate radioactive waste projections in the Integrated Data Base (IDB) Program are given. Volumes of each waste type generated per unit product throughput have been determined for the following facilities: uranium mining, UF 6 conversion, uranium enrichment, fuel fabrication, boiling-water reactors (BWRs), pressurized-water reactors (PWRs), and fuel reprocessing. Source terms for DOE/defense wastes have been developed. Expected wastes from typical decommissioning operations for each facility type have been determined. All wastes are also characterized by isotopic composition at time of generation and by general chemical composition. 70 references, 21 figures, 53 tables

  12. Efficient recovery and upgrading of waste heat from humid air in the forest industry. Pre-feasibility study; Energieffektivisering inom skogsindustrin genom spillvaermeaatervinning fraan vaatluft. Foerprojektering och loensamhetsbedoemning av anlaeggningsalternativ

    Energy Technology Data Exchange (ETDEWEB)

    Ingman, Daniel; Gustafsson, Maria; Westermark, Mats

    2007-12-15

    efficiency for the heat upgrading process. The project was started with a questionnaire to the forest industry, including questions on temperature requirements for the upgraded heat. Out of 16 addressed and evaluated industries, three were selected for a more in-deep assessment. The following mills were selected: Braviken, Froevi and Malaa saw mill. Cost effective process solutions production of both process steam and district heating were studied for a number of waste heat sources. Upgraded waste heat is primary considered on the level of 85-90 deg C, but also hot water and process steam on 1-3 bar level. Waste heat sources evaluated in the techno-economic assessment are paper machine outlet, flue gases from power and recovery boilers as well as from lumber dryers. The results within every category are considered to be relatively general for similar companies in the forest industry. For all cases, a heat factor (coefficient of performance) 1.5-1.7 is calculated, i.e. the relation between upgraded waste heat (when applicable also incl. process steam) and the driving steam. A feasibility study for the three industries was carried out for four different process solutions for a pre-fabricated module of approximately 5 MW upgraded waste heat capacity. The investment cost for these modules was calculated to MSEK 14-19 on a +-30% level. The specific investment cost in relation to the upgraded waste heat capacity, varies between SEK 2,700 and 3,700 per kW of useful heat. The economic assessment shows a payback time under 2 years for three of the four processes that produce hot water and LLP steam. The forth process, for upgrading waste heat to LP steam (3 bara) via steam compression, is not profitable with the present assumptions. With the current energy costs there are no incentives to upgrade waste heat to LP steam with an absorption heat pump and steam compression. The study has shown that this novel absorption heat pump technology has technical and economical potential to

  13. ATLAS Calorimeters: Run-2 performance and Phase-II upgrade

    CERN Document Server

    Boumediene, Djamel Eddine; The ATLAS collaboration

    2017-01-01

    The ATLAS detector was designed and built to study proton-proton collisions produced at the LHC at centre-of-mass energies up to 14 TeV and instantaneous luminosities up to 10^{34} cm^{−2} s^{−1}. A liquid argon (LAr)-lead sampling calorimeter is employed as electromagnetic calorimeter and hadronic calorimter, except in the barrel region, where a scintillator-steel sampling calorimeter (TileCal) is used as hadronic calorimter. This presentation will give first an overview of the detector operation and data quality, as well as the achieved performance of the ATLAS calorimetry system. Additionally, the upgrade projects of the ATLAS calorimeter system for the high luminosity phase of the LHC (HL-LHC) will be presented. For the HL-LHC, the instantaneous luminosity is expected to increase up to L ≃ 7.5 × 10^{34} cm^{−2} s^{−1} and the average pile-up up to 200 interactions per bunch crossing. The major R&D item is the upgrade of the electronics for both LAr and Tile calorimeters in order to cope wit...

  14. ATLAS calorimeters: Run-2 performances and Phase-II upgrades

    CERN Document Server

    Boumediene, Djamel Eddine; The ATLAS collaboration

    2017-01-01

    The ATLAS detector was designed and built to study proton-proton collisions produced at the LHC at centre-of-mass energies up to 14 TeV and instantaneous luminosities up to $10^{34} cm^{-2} s^{-1}$. A Liquid Argon-lead sampling (LAr) calorimeter is employed as electromagnetic and hadronic calorimeters, except in the barrel region, where a scintillator-steel sampling calorimeter (TileCal) is used as hadronic calorimeter. This presentation gives first an overview of the detector operation and data quality, as well as of the achieved performances of the ATLAS calorimetry system. Additionally the upgrade projects of the ATLAS calorimeter system for the high luminosity phase of the LHC (HL-LHC) are presented. For the HL-LHC, the instantaneous luminosity is expected to increase up to $L \\simeq 7.5 × 10^{34} cm^{-2} s^{-1}$ and the average pile-up up to 200 interactions per bunch crossing. The major R&D item is the upgrade of the electronics for both LAr and Tile calorimeters in order to cope with longer latenc...

  15. Community-Scale Attic Retrofit and Home Energy Upgrade Data Mining

    Energy Technology Data Exchange (ETDEWEB)

    Berman, M. [Alliance for Residential Building Innovation, Davis, CA (United States); Smith, P. [Alliance for Residential Building Innovation, Davis, CA (United States); Jackson, J. [Alliance for Residential Building Innovation, Davis, CA (United States)

    2015-05-07

    The U.S. Department of Energy’s Building America research team, Alliance for Residential Building Innovation (ARBI), implemented a project to increase residential retrofits in Davis, California. The project used a neighborhood-focused strategy for implementation and a low-cost retrofit program that focused on upgraded attic insulation and duct sealing. ARBI worked with a community partner, the not-for-profit Cool Davis Initiative, as well as selected area contractors to implement a strategy that sought to capitalize on the strong local expertise of partners and the unique aspects of the Davis, California, community. Working with community partners also allowed ARBI to collect and analyze data about effective messaging tactics for community-based retrofit programs.

  16. The D0 detector upgrade

    International Nuclear Information System (INIS)

    Bross, A.D.

    1995-02-01

    The Fermilab collider program is undergoing a major upgrade of both the accelerator complex and the two detectors. Operation of the Tevatron at luminosities upwards of ten time that currently provided will occur in early 1999 after the commissioning of the new Fermilab Main Injector. The D0 upgrade program has been established to deliver a detector that will meet the challenges of this environment. A new magnetic tracker consisting of a superconducting solenoid, a silicon vertex detector, a scintillating fiber central tracker, and a central preshower detector will replace the current central tracking and transition radiation chambers. We present the design and performance capabilities of these new systems and describe results from physics simulations that demonstrate the physics reach of the upgraded detector

  17. Public-Interest Benefit Evaluation of Partial- Upgrading Technology

    Directory of Open Access Journals (Sweden)

    G. Kent Fellows

    2017-01-01

    Full Text Available Approximately 60 per cent of Alberta’s oil sands production is non-upgraded bitumen which, after being mixed with a diluting agent (diluent to allow transport, is exported. A popular view within Alberta — and particularly among Albertan politicians — is that a much larger share of oil sands bitumen should be upgraded in the province. However, without public subsidies or government underwriting, it is uneconomic to build and operate new facilities in Alberta to fully upgrade the bitumen into synthetic crude oil. But there are new partial upgrading technologies being developed that, subject to successful testing at a larger (commercial pilot scale, can prove to be not only economic in Alberta, but also generate large social and economic benefits for the province. The advantages include a much smaller capital investment, a significant increase in the value of the product and market for the product and, even more importantly, a dramatic reduction in the need for large amounts of expensive diluent to transport the product to market. Indeed, the only diluent required will be that to move the bitumen from the production site to the partial upgrader and this can be continually recycled. The market for the synthetic crude oil produced by full upgrading is only getting tougher. Any Alberta bitumen fully upgraded here would compete closely with the rapidly expanding supply of light U.S. unconventional oil. Partial upgrading does not upgrade bitumen to a light crude, but to something resembling more of a medium or heavy crude, and at a lower cost per barrel than full upgrading. Unlike in the increasingly crowded light-crude market, the Alberta Royalty Review Advisory Panel recognized that currently there are gaps in several North American refineries that could be filled by this partially upgraded Alberta oil. A partial upgrader serving that less-competitive market not only appears to hold the potential for investors to make attractive returns in the

  18. Simulations of Electron Cloud Effects on the Beam Dynamics for the FNAL Main Injector Upgrade

    International Nuclear Information System (INIS)

    Sonnad Kiran G.; Furman, Miguel; Vay, Jean-Luc; Venturini, Marco; Celata, Christine M.; Grote, David

    2006-01-01

    The Fermilab main injector (MI) is being considered for an upgrade as part of the high intensity neutrino source (HINS) effort. This upgrade will involve a significant increasing of the bunch intensity relative to its present value. Such an increase will place the MI in a regime in which electron-cloud effects are expected to become important. We have used the electrostatic particle-in-cell code WARP, recently augmented with new modeling capabilities and simulation techniques, to study the dynamics of beam-electron cloud interaction. This work in progress involves a systematic assessment of beam instabilities due to the presence of electron clouds

  19. Beam dynamics studies of the ISOLDE post-accelerator for the high intensity and energy upgrade

    CERN Document Server

    Fraser, M A

    2012-01-01

    The High Intensity and Energy (HIE) project represents a major upgrade of the ISOLDE (On-Line Isotope Mass Separator) nuclear facility at CERN with a mandate to significantly increase the energy, intensity and quality of the radioactive nuclear beams provided to the European nuclear physics community for research at the forefront of topics such as nuclear structure physics and nuclear astrophysics. The HIE-ISOLDE project focuses on the upgrade of the existing Radioactive ion beam EXperiment (REX) post-accelerator with the addition of a 40MVsuperconducting linac comprising 32 niobium sputter-coated copper quarter-wave cavities operating at 101.28 MHz and at an accelerating gradient close to 6 MV/m. The energy of post-accelerated radioactive nuclear beams will be increased from the present ceiling of 3 MeV/u to over 10 MeV/u, with full variability in energy, and will permit, amongst others, Coulomb interaction and few-nucleon transfer reactions to be carried out on the full inventory of radionuclides available ...

  20. Beam Dynamics Studies of the ISOLDE Post-accelerator for the High Intensity and Energy Upgrade

    CERN Document Server

    Fraser, Matthew Alexander; Pasini, M

    2012-01-01

    The High Intensity and Energy (HIE) project represents a major upgrade of the ISOLDE (On-Line Isotope Mass Separator) nuclear facility at CERN with a mandate to significantly increase the energy, intensity and quality of the radioactive nuclear beams provided to the European nuclear physics community for research at the forefront of topics such as nuclear structure physics and nuclear astrophysics. The HIE-ISOLDE project focuses on the upgrade of the existing Radioactive ion beam EXperiment (REX) post-accelerator with the addition of a 40MVsuperconducting linac comprising 32 niobium sputter-coated copper quarter-wave cavities operating at 101.28 MHz and at an accelerating gradient close to 6 MV/m. The energy of post-accelerated radioactive nuclear beams will be increased from the present ceiling of 3 MeV/u to over 10 MeV/u, with full variability in energy, and will permit, amongst others, Coulomb interaction and few-nucleon transfer reactions to be carried out on the full inventory of radionuclides available ...

  1. The state and profile of open source software projects in health and medical informatics.

    Science.gov (United States)

    Janamanchi, Balaji; Katsamakas, Evangelos; Raghupathi, Wullianallur; Gao, Wei

    2009-07-01

    Little has been published about the application profiles and development patterns of open source software (OSS) in health and medical informatics. This study explores these issues with an analysis of health and medical informatics related OSS projects on SourceForge, a large repository of open source projects. A search was conducted on the SourceForge website during the period from May 1 to 15, 2007, to identify health and medical informatics OSS projects. This search resulted in a sample of 174 projects. A Java-based parser was written to extract data for several of the key variables of each project. Several visually descriptive statistics were generated to analyze the profiles of the OSS projects. Many of the projects have sponsors, implying a growing interest in OSS among organizations. Sponsorship, we discovered, has a significant impact on project success metrics. Nearly two-thirds of the projects have a restrictive license type. Restrictive licensing may indicate tighter control over the development process. Our sample includes a wide range of projects that are at various stages of development (status). Projects targeted towards the advanced end user are primarily focused on bio-informatics, data formats, database and medical science applications. We conclude that there exists an active and thriving OSS development community that is focusing on health and medical informatics. A wide range of OSS applications are in development, from bio-informatics to hospital information systems. A profile of OSS in health and medical informatics emerges that is distinct and unique to the health care field. Future research can focus on OSS acceptance and diffusion and impact on cost, efficiency and quality of health care.

  2. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  3. Sources of innovation, their combinations and strengths – benefits at the NPD project level

    DEFF Research Database (Denmark)

    Tranekjer, Tina Lundø; Søndergaard, Helle Alsted

    2013-01-01

    External sourcing is increasingly seen as important for obtaining new and valuable knowledge and resources for new product development. However, when it comes to the specifics of choosing between sources and types of relationships, little is known on the NPD project level. This paper strengthens...... not only consider the potential benefits of collaboration with external sources but also the downsides, including higher cost and lengthier projects. Firms should look for opportunities in the combination of sources if they are to gain advantages of collaboration, as our analyses show that a mix of market...... and science sources is related to decreased costs. Additionally, if firms are looking for increased market performance, they should aim at collaborating with suppliers that have a similar knowledge base, whereas if the aim is lower project costs, collaboration with a customer with a similar knowledge base...

  4. High stability power sources for bending and quadrupole magnets of TRISTAN project

    International Nuclear Information System (INIS)

    Kumagai, Noritaka; Ogawa, Shin-ichi; Koseki, Shoichiro; Nagasaka, Saburo.

    1985-01-01

    The excitation power sources for the main ring magnets of the TRISTAN project of the Ministry of Educations's National Laboratory for High Energy Physics requires strict performances of 10 -4 for both long time stability and the ripple factor of the DC output current to obtain a stable beam. To satisfy such specifications, a precision current detector, and active filter, and other such technologies are used for the power source. To verify the performance of this power source, a prototype was manufactured and a combined test was done with the magnets actually used at the National Laboratory. The results have proved that the output stability, ripple factor, current tracking, and other specifications are quite satisfactory and, at present, 80 sets have been manufactured for the TRISTAN project. This paper describes the project's power supply system and reports the results of performance tests on the prototype. (author)

  5. Initial performance of upgraded Tevatron cryogenic systems

    International Nuclear Information System (INIS)

    Norris, B.L.

    1996-09-01

    Fermilab began operating a re-designed satellite refrigerator systems in November 1993. Upgrades were installed to operate the Tevatron at a magnet temperature of 3.5 K, approximately 1K lower than the original design. Refrigerator upgrades included new valve boxes, larger reciprocating expanders, the installation of cold vapor compressors, new sub-atmospheric instrumentation and an entirely new distributed controls system. Cryogenic system reliability data for Colliding Physics Run 1B is presented emphasizing a failure analysis for each aspect of the upgrade. Comparison to data for Colliding Physics Run 1A (previous to upgrade) is presented to show the impact of a major system overhaul. New operational problems and their solutions are presented in detail

  6. Analysis of Paralleling Limited Capacity Voltage Sources by Projective Geometry Method

    Directory of Open Access Journals (Sweden)

    Alexandr Penin

    2014-01-01

    Full Text Available The droop current-sharing method for voltage sources of a limited capacity is considered. Influence of equalizing resistors and load resistor is investigated on uniform distribution of relative values of currents when the actual loading corresponds to the capacity of a concrete source. Novel concepts for quantitative representation of operating regimes of sources are entered with use of projective geometry method.

  7. Analysis of Energy Industry Upgrading in Northeast China

    Science.gov (United States)

    Liu, Xiao-jing; Ji, Yu-liang; Guan, Bai-feng; Jing, Xin

    2018-02-01

    Promoting regional economic growth and realizing the transformation of the mode of economic growth are in industrial upgrading essence The product is a carrier that represents a series of links of production, management and marketing behind the enterprise, and is a comprehensive reflection of the knowledge and ability of a country or region. Based on the industrial spatial structure, this paper visualizes the industrial space in Northeast China from 2005 to 2015, analyzes the comparative advantages of the energy industry in Northeast China, and examines the status quo of the upgrade of the energy industry according to the industrial upgrading status. Based on the industrial spatial structure, Industry intensity in the industrial space, put forward the future direction of the energy industry upgrade and upgrade path.

  8. Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico

    Science.gov (United States)

    2014-09-01

    Mexico Environmental Geo ra hie InformationS stem Source: NNSA AOWC Agent Operations Westem Command ER Environmental restoration NNSA National...8217)’ UU1’ Cll TONGA TE J)oputy Secretaey RE: Kirtland Air Force Dase~ Environmental Assessment for Operations, Upgrades and Consolidation at the Western

  9. Upgrade of the Los Alamos Plutonium Facility control system

    International Nuclear Information System (INIS)

    Pope, N.G.; Turner, W.J.; Brown, R.E.; Bibeau, R.A.; Davis, R.R.; Hogan, K.

    1996-01-01

    After 20 yrs service, the Los Alamos Plutonium Facility is undergoing an upgrade to its aging Facility Control System. The new system design includes a network of redundantly-paired programmable logic controllers that will interface with about 2200 field data points. The data communications network that has been designed includes a redundant, self-healing fiber optic data highway as well as a fiber optic ethernet. Commercially available human-machine interface software running on a UNIX-based system displays facility subsystem status operator X-terminals. Project design features, methods, costs, and schedule are discussed

  10. Status of the HIE-ISOLDE Project at CERN

    CERN Document Server

    Kadi, Y; Blumenfeld, Y; Bravin, E; Calatroni, S; Catherall, R; Fraser, M A; Goddard, B; Parchet, D; Siesling, E; Vandoni, G; Venturini Delsolaro, W; Voulot, D; Williams, L R

    2012-01-01

    The HIE-ISOLDE project represents a major upgrade of the ISOLDE facility with a mandate to significantly improve the quality and increase the intensity and energy of radioactive nuclear beams produced at CERN. The project will expand the experimental nuclear physics programme at ISOLDE by focusing on an upgrade of the existing REX linac with a 40 MV superconducting linac comprising thirty-two niobium-on-copper sputter-coated quarter-wave resonators housed in six cryomodules. The new linac will raise the energy of post-accelerated beams from 3 MeV/u to over 10 MeV/u. The upgrade will be staged to first deliver beam energies of 5.5 MeV/u using two high-β cryomodules placed downstream of REX, before the energy variable section of the existing linac is replaced with two low-β cryomodules and two additional high-β cryomodules are installed to attain over 10 MeV/u with full energy variability from as low as 0.45 MeV/u. An overview of the project including a status summary of the different R&D activities and ...

  11. Developments towards the LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Cid Vidal, Xabier, E-mail: xabier.cid.vidal@cern.ch

    2016-09-21

    The Vertex Locator (VELO) is a silicon strip detector surrounding the interaction region of the LHCb experiment. The upgrade of the VELO is planned to be installed in 2019–2020, and the current detector will be replaced by a hybrid pixel system equipped with electronics capable of reading out at a rate of 40 MHz. The new detector is designed to withstand the radiation dose expected at an integrated luminosity of 50 fb{sup −1}. The detector will be composed of silicon pixel sensors, read out by the VeloPix ASIC that is being developed based on the TimePix/MediPix family. The prototype sensors for the VELO upgrade are being irradiated in five different facilities and the post-irradiation performance is being measured with testbeams, and in the lab. These proceedings present the VELO upgrade and briefly discuss the results of the sensor testing campaign. - Highlights: • The VELO is the detector surrounding the LHCb collision point. • After its upgrade, the VELO will be capable of reading out at a rate of 40 MHz. • The detector will be composed of Si pixel sensors, read out by the VeloPix ASIC. • The irradiated prototype sensors for the VELO upgrade are currently being tested.

  12. Projection of needs for gamma radiation sources and other radioisotopes and assessment of alternatives for providing radiation sources

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.A.; Jensen, G.A.; Clark, L.L.; Eakin, D.E.; Jarrett, J.H.; Katayama, Y.B.; McKee, R.W.; Morgan, L.G.; Nealey, S.M.; Platt, A.M.; Tingey, G.L.

    1989-06-01

    Pacific Northwest Laboratory reviewed the projected uses and demands for a variety of nuclear byproducts. Because the major large-scale near-term demand is for gamma irradiation sources, this report concentrates on the needs for gamma sources and evaluates the options for providing the needed material. Projections of possible growth in the irradiation treatment industry indicate that there will be a need for 180 to 320 MCi of /sup 60/Co (including /sup 137/Cs equivalent) in service in the year 2000. The largest current and projected use of gamma irradiation is for the sterilization of medical devices and disposable medical supplies. Currently, 40% of US disposable medical products are treated by irradiation, and within 10 years it is expected that 90% will be treated in this manner. Irradiation treatment of food for destruction of pathogens or parasites, disinfestation, or extension of allowable storage periods is estimated to require an active inventory of 75 MCi of /sup 60/Co-equivalent gamma source in about a decade. 90 refs., 7 figs., 25 tabs.

  13. Projection of needs for gamma radiation sources and other radioisotopes and assessment of alternatives for providing radiation sources

    International Nuclear Information System (INIS)

    Ross, W.A.; Jensen, G.A.; Clark, L.L.

    1989-06-01

    Pacific Northwest Laboratory reviewed the projected uses and demands for a variety of nuclear byproducts. Because the major large-scale near-term demand is for gamma irradiation sources, this report concentrates on the needs for gamma sources and evaluates the options for providing the needed material. Projections of possible growth in the irradiation treatment industry indicate that there will be a need for 180 to 320 MCi of 60 Co (including 137 Cs equivalent) in service in the year 2000. The largest current and projected use of gamma irradiation is for the sterilization of medical devices and disposable medical supplies. Currently, 40% of US disposable medical products are treated by irradiation, and within 10 years it is expected that 90% will be treated in this manner. Irradiation treatment of food for destruction of pathogens or parasites, disinfestation, or extension of allowable storage periods is estimated to require an active inventory of 75 MCi of 60 Co-equivalent gamma source in about a decade. 90 refs., 7 figs., 25 tabs

  14. Coal upgrading based on the high temperature reactor - engineering and economic aspects

    International Nuclear Information System (INIS)

    Barnert, H.; Neis, H.

    1987-01-01

    The development of the high temperature reactor in the FRG was opened with the aim of economically producing electricity which might be achieved with the next project works. Moreover, the HTR supplies process heat of very high temperature which may be used with metallic heat exchangers in the range up to 1000 0 C. From these reasons and regarding the world power prospects and the special power situation in our own country, the FRG began to develop methods of upgrading fossil primary energy sources using high-temperature heat from the HTR about 15 years ago. Meanwhile great progress has been achieved in research, development and test works; the modules are developed to a great extent. Economical service is expected for future utilization of selected processes. Problems to be still accomplished are first of all related to system testing as well as further exhaustion of the HTR's temperature potential. The proposed extension of the AVR to some process heat facility offers the possibility of testing the system in a low-cost and accelerated manner. (author)

  15. Alberta propylene upgrading prospects

    International Nuclear Information System (INIS)

    2000-03-01

    A very significant byproduct recovery and purification scheme is at present being prepared by TransCanada Midstream (TCMS). Alberta Economic Development commissioned an independent study to identify propylene supply options while proceeding with the evaluation of various propylene derivatives with regard to their fit with the Alberta context. Identification of chemical companies with derivative interests was also accomplished. By 2005, it is estimated that 280 kilo-tonnes of propylene will be available on an annual basis from byproduct sources. Those sources are oil sands upgraders, ethylene plants and refineries. The ranges of impurities and supply costs vary between the different sources. An option being considered involves pipeline and rail receipt with a major central treating and distillation facility for the production of polymer grade (PG) propylene with propane and other smaller byproducts. Special consideration was given to three chemicals in this study, namely: polypropylene (PP), acrylonitrile (ACN), and acrylic acid (AA). Above average growth rates were identified for these chemicals: demand is growing at 6 to 7 per cent a year for both PP and ACN, while demand for AA grows at 8 per cent annually. Two other possibilities were identified, propylene oxide (PO) and phenol. The study led to the conclusion that low capital and operating costs and shipping costs to the Pacific Rim represent advantages to the development of propylene derivatives in the future in Alberta. 4 refs., 87 tabs., 7 figs

  16. Upgrade of the Control System of the IFUNAM's Pelletron Accelerator

    OpenAIRE

    Macias, R.; Chavez, E.; Ortiz, M. E.; Lopez, K.; Huerta, A.; Verde, M. C.

    2001-01-01

    In 1995 a 9SDH-2 Pelletron from NEC was installed at IFUNAM (Instituto de Fisica, Universidad Nacional Autonoma de Mexico). Two beam lines have been operational since then and two new lines have been built. In order to perform the planned projects in this grown facility, an upgrading of the original manual control system is required. The proposed new control system takes advantage of the existing devices and incorporates the electronics needed for the newer beam lines. The control software fr...

  17. OMEGA upgrade staging options

    International Nuclear Information System (INIS)

    Kelly, J.H.; Shoup, M.J.; Smith, D.L.

    1989-01-01

    The authors discuss how they are designing an upgrade to its 24-beam OMEGA laser system, OMEGA is a frequency tripled, all-rod system capable of producing 2 kJ at 0.8 ns on target. Important direct-drive-target-ignition physics could be investigated with an upgraded system capable of producing a shaped pulse consisting of a long (5ns) low-intensity, foot, smoothly transitioning into a short (0.5 ns), intense, compression pulse. The total pulse energy is 30 kJ, which, from target-irradiation uniformity considerations, must be distributed over 60 beams

  18. Applying EVM principles to Tevatron Beam Position Monitor Project

    International Nuclear Information System (INIS)

    Banerjee, Bakul

    2005-01-01

    At Fermi National Accelerator Laboratory (Fermilab), the Tevatron high energy particle collider must meet the increasing scientific demand of higher beam luminosity. To achieve this higher luminosity goal, U. S. Department of Energy (DOE) sponsored a major upgrade of capabilities of Fermilab's accelerator complex that spans five years and costs over fifty million dollars. Tevatron Beam Position Monitor (BPM) system upgrade is a part of this project, generally called RunII upgrade project. Since the purpose of the Tevatron collider is to detect the smashing of proton and anti-protons orbiting the circular accelerator in opposite directions, capability to detect positions of both protons and antiprotons at a high resolution level is a desirable functionality of the monitoring system. The original system was installed during early 1980s, along with the original construction of the Tevatron. However, electronic technology available in 1980s did not allow for the detection of significantly smaller resolution of antiprotons. The objective of the upgrade project is to replace the existing BPM system with a new system utilizing capabilities of modern electronics enhanced by a front-end software driven by a real-time operating software. The new BPM system is designed to detect both protons and antiprotons with increased resolution of up to an order of magnitude. The new system is capable of maintaining a very high-level of data integrity and system reliability. The system consists of 27 VME crates installed at 27 service buildings around the Tevatron ring servicing 236 beam position monitors placed underground, inside the accelerator tunnel. Each crate consists of a single Timing Generator Fanout module, custom made by Fermilab staff, one MVME processor card running VxWorks 5.5, multiple Echotek Digital Receiver boards complimented by custom made Filter Board. The VxWorks based front-end software communicates with the Main Accelerator Control software via a special

  19. Improved Discrete Ordinate Solutions in the Presence of an Anisotropically Reflecting Lower Boundary: Upgrades of the DISORT Computational Tool

    Science.gov (United States)

    Lin, Z.; Stamnes, S.; Jin, Z.; Laszlo, I.; Tsay, S. C.; Wiscombe, W. J.; Stamnes, K.

    2015-01-01

    A successor version 3 of DISORT (DISORT3) is presented with important upgrades that improve the accuracy, efficiency, and stability of the algorithm. Compared with version 2 (DISORT2 released in 2000) these upgrades include (a) a redesigned BRDF computation that improves both speed and accuracy, (b) a revised treatment of the single scattering correction, and (c) additional efficiency and stability upgrades for beam sources. In DISORT3 the BRDF computation is improved in the following three ways: (i) the Fourier decomposition is prepared "off-line", thus avoiding the repeated internal computations done in DISORT2; (ii) a large enough number of terms in the Fourier expansion of the BRDF is employed to guarantee accurate values of the expansion coefficients (default is 200 instead of 50 in DISORT2); (iii) in the post processing step the reflection of the direct attenuated beam from the lower boundary is included resulting in a more accurate single scattering correction. These improvements in the treatment of the BRDF have led to improved accuracy and a several-fold increase in speed. In addition, the stability of beam sources has been improved by removing a singularity occurring when the cosine of the incident beam angle is too close to the reciprocal of any of the eigenvalues. The efficiency for beam sources has been further improved from reducing by a factor of 2 (compared to DISORT2) the dimension of the linear system of equations that must be solved to obtain the particular solutions, and by replacing the LINPAK routines used in DISORT2 by LAPACK 3.5 in DISORT3. These beam source stability and efficiency upgrades bring enhanced stability and an additional 5-7% improvement in speed. Numerical results are provided to demonstrate and quantify the improvements in accuracy and efficiency of DISORT3 compared to DISORT2.

  20. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Oreglia, M; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The main upgrade will occur for the High Luminosity LHC phase (phase 2) which is scheduled around 2022. The upgrade aims at replacing the majority of the on- and off- detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. An ambitious upgrade development program is pursued studying different electronics options. Three different options are presently being investigated for the front-end electronic upgrade. Which one to use will be decided after extensive test beam studies. High speed optical links are used to read out all digitized data to the counting room. For the off-detector electronics a new back-end architecture is being developed, including the initial trigger processing and pipeline memories. A demonstrator prototype read-out for a slice of the ...

  1. Development of target ion source systems for radioactive beams at GANIL

    Energy Technology Data Exchange (ETDEWEB)

    Bajeat, O., E-mail: bajeat@ganil.fr [GANIL, BP 55027, 14076 CAEN Cedex 05 (France); Delahaye, P. [GANIL, BP 55027, 14076 CAEN Cedex 05 (France); Couratin, C. [GANIL, BP 55027, 14076 CAEN Cedex 05 (France); LPC Caen, 6 bd Maréchal Juin, 14050 CAEN Cedex (France); Dubois, M.; Franberg-Delahaye, H.; Henares, J.L.; Huguet, Y.; Jardin, P.; Lecesne, N.; Lecomte, P.; Leroy, R.; Maunoury, L.; Osmond, B.; Sjodin, M. [GANIL, BP 55027, 14076 CAEN Cedex 05 (France)

    2013-12-15

    Highlights: • For Spiral 1, a febiad ion source has been connected to a graphite target. • For Spiral 2, an oven made with a carbon resistor is under development. • We made some measurement of effusion in the Spiral 2 target. • A laser ion source is under construction. -- Abstract: The GANIL facility (Caen, France) is dedicated to the acceleration of heavy ion beams including radioactive beams produced by the Isotope Separation On-Line (ISOL) method at the SPIRAL1 facility. To extend the range of radioactive ion beams available at GANIL, using the ISOL method two projects are underway: SPIRAL1 upgrade and the construction of SPIRAL2. For SPIRAL1, a new target ion source system (TISS) using the VADIS FEBIAD ion source coupled to the SPIRAL1 carbon target will be tested on-line by the end of 2013 and installed in the cave of SPIRAL1 for operation in 2015. The SPIRAL2 project is under construction and is being design for using different production methods as fission, fusion or spallation reactions to cover a large area of the chart of nuclei. It will produce among others neutron rich beams obtained by the fission of uranium induced by fast neutrons. The production target made from uranium carbide and heated at 2000 °C will be associated with several types of ion sources. Developments currently in progress at GANIL for each of these projects are presented.

  2. Technical design report for the upgrade of the ICD for D-Zero Run II

    International Nuclear Information System (INIS)

    Sawyer, L.; De, K.; Draper, P.; Gallas, E.; Li, J.; Sosebee, M.; Stephens, R.W.; White, A.

    1998-01-01

    The Inter Cryostat Detector (ICD) used in Run I of the D0 Experiment will be inoperable in the central, high magnetic field planned for Run II. In Run I, the ICD enhanced the hermeticity and uniformity of the D0 calorimeter system, improving both missing transverse energy and jet energy resolution. The goals for the Run II ICD are the same. In this document, the physics arguments for maintaining the ICD are presented, followed by a detailed description of the planned design changes, prototype tests, construction, installation, and commissioning of the device for the Run II D0 detector. Estimates of costs and schedule can be found on //DOSERVER2/Operations/Upgrade Project/ subareas available via DZERO's WinFrame Program Manager. This detector is not intended to provide any ''L0'' capabilities (for luminosity monitoring), or to provide any EM coverage in the intermediate region, or to provide additional coverage in the intermediate regions, unlike previous upgrades proposed in this detector region. The ICD upgrade described here maintains most of the Run I capabilities in a high magnetic field environment

  3. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  4. System upgradation for surface mode negative ion beam extraction experiments in ROBIN

    International Nuclear Information System (INIS)

    Pandya, Kaushal; Bansal, Gourab; Gahlaut, Agrajit; Soni, Jignesh; Yadav, Ratnakar K.; Mahesh, Vuppugalla; Tyagi, Himanshu; Parmar, KanuG.; Mistri, Hiren; Bhagora, Jighesh; Prajapati, Bhavesh; Patel, Kartik; Bhuyan, Manas; Gouswami, Mehul; Bandyopadhyay, Mainak; Chakraborty, Arun K.

    2017-01-01

    Operational commissioning of ROBIN forms an important milestone in the Indian programme on the R&D on negative ion beams. The commissioning activity has been effected in sequence, in synchronisation with the availability of High voltage Power Supply (HVPS) systems and routine operation has now been established in the cesiated, surface mode. Significant efforts have been placed in upgrading the system to initiate the surface mode operation. These include incorporation of a temperature controlled Cesium (Cs) delivery system, spectroscopic diagnostics for detection of Cs lines, installation of plasma grid heating and closed loop warm water circuit for source components heating and Doppler Shift Spectroscopy (DSS) system. The specific design and integration features for these upgrades are discussed and preliminary results obtained from the operation of ROBIN in the surface mode are presented.

  5. Low voltage powering of on-detector electronics for HL-LHC experiments upgrades

    CERN Document Server

    Bobillier, Vincent; Vasey, Francois; Karmakar, Sabyasachi; Maity, Manas; Roy, Subhasish; Kundu, Tapas Kumar

    2018-01-01

    All LHC experiments will be upgraded during the next LHC long shutdowns (LS2 and LS3). The increase in resolution and luminosity and the use of more advanced CMOS technology nodes typically implies higher current consumption of the on-detector electronics. In this context, and in view of limiting the cable voltage drop, point-of-load DC-DC converters will be used on detector. This will have a direct impact on the existing powering scheme, implying new AC-DC and/or DC-DC stages as well as changes in the power cabling infrastructure. This paper presents the first results obtained while evaluating different LV powering schemes and distribution layouts for HL-LHC trackers. The precise low voltage power source requirements are being assessed and understood using the CMS tracker upgrade as a use-case.

  6. System upgradation for surface mode negative ion beam extraction experiments in ROBIN

    Energy Technology Data Exchange (ETDEWEB)

    Pandya, Kaushal, E-mail: kpandya@ipr.res.in [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Bansal, Gourab; Gahlaut, Agrajit; Soni, Jignesh [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Yadav, Ratnakar K. [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Mahesh, Vuppugalla [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Tyagi, Himanshu [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Parmar, KanuG.; Mistri, Hiren [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Bhagora, Jighesh [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Prajapati, Bhavesh; Patel, Kartik [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Bhuyan, Manas [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Gouswami, Mehul [Bhakti Management Services, Gandhinagar, 382007, Gujarat (India); Bandyopadhyay, Mainak [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Chakraborty, Arun K. [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India)

    2017-01-15

    Operational commissioning of ROBIN forms an important milestone in the Indian programme on the R&D on negative ion beams. The commissioning activity has been effected in sequence, in synchronisation with the availability of High voltage Power Supply (HVPS) systems and routine operation has now been established in the cesiated, surface mode. Significant efforts have been placed in upgrading the system to initiate the surface mode operation. These include incorporation of a temperature controlled Cesium (Cs) delivery system, spectroscopic diagnostics for detection of Cs lines, installation of plasma grid heating and closed loop warm water circuit for source components heating and Doppler Shift Spectroscopy (DSS) system. The specific design and integration features for these upgrades are discussed and preliminary results obtained from the operation of ROBIN in the surface mode are presented.

  7. Silicon Sensors for the Upgrades of the CMS Pixel Detector

    CERN Document Server

    Centis Vignali, Matteo; Schleper, Peter

    2015-01-01

    The Compact Muon Solenoid (CMS) is a general purpose detector at the Large Hadron Collider (LHC). The LHC luminosity is constantly increased through upgrades of the accel- erator and its injection chain. Two major upgrades will take place in the next years. The rst upgrade involves the LHC injector chain and allows the collider to achieve a luminosity of about 2 10 34 cm-2 s-1 A further upgrade of the LHC foreseen for 2025 will boost its luminosity to 5 10 34 cm-2 s1. As a consequence of the increased luminosity, the detectors need to be upgraded. In particular, the CMS pixel detector will undergo two upgrades in the next years. The rst upgrade (phase I) consists in the substitution of the current pixel detector in winter 2016/2017. The upgraded pixel detector will implement new readout elec- tronics that allow ecient data taking up to a luminosity of 2 10 34 cm-2s-1,twice as much as the LHC design luminosity. The modules that will constitute the upgraded detector are being produced at dierent institutes. Ham...

  8. Full data consistency conditions for cone-beam projections with sources on a plane

    International Nuclear Information System (INIS)

    Clackdoyle, Rolf; Desbat, Laurent

    2013-01-01

    Cone-beam consistency conditions (also known as range conditions) are mathematical relationships between different cone-beam projections, and they therefore describe the redundancy or overlap of information between projections. These redundancies have often been exploited for applications in image reconstruction. In this work we describe new consistency conditions for cone-beam projections whose source positions lie on a plane. A further restriction is that the target object must not intersect this plane. The conditions require that moments of the cone-beam projections be polynomial functions of the source positions, with some additional constraints on the coefficients of the polynomials. A precise description of the consistency conditions is that the four parameters of the cone-beam projections (two for the detector, two for the source position) can be expressed with just three variables, using a certain formulation involving homogeneous polynomials. The main contribution of this work is our demonstration that these conditions are not only necessary, but also sufficient. Thus the consistency conditions completely characterize all redundancies, so no other independent conditions are possible and in this sense the conditions are full. The idea of the proof is to use the known consistency conditions for 3D parallel projections, and to then apply a 1996 theorem of Edholm and Danielsson that links parallel to cone-beam projections. The consistency conditions are illustrated with a simulation example. (paper)

  9. Upgraded vacuum arc ion source for metal ion implantation

    International Nuclear Information System (INIS)

    Nikolaev, A. G.; Oks, E. M.; Savkin, K. P.; Yushkov, G. Yu.; Brown, I. G.

    2012-01-01

    Vacuum arc ion sources have been made and used by a large number of research groups around the world over the past twenty years. The first generation of vacuum arc ion sources (dubbed ''Mevva,'' for metal vapor vacuum arc) was developed at Lawrence Berkeley National Laboratory in the 1980s. This paper considers the design, performance parameters, and some applications of a new modified version of this kind of source which we have called Mevva-V.Ru. The source produces broad beams of metal ions at an extraction voltage of up to 60 kV and a time-averaged ion beam current in the milliampere range. Here, we describe the Mevva-V.Ru vacuum arc ion source that we have developed at Tomsk and summarize its beam characteristics along with some of the applications to which we have put it. We also describe the source performance using compound cathodes.

  10. Upgraded fuel from reed canary grass

    Energy Technology Data Exchange (ETDEWEB)

    Heiskanen, V.P.

    1995-12-31

    The feasibility of RCG for commercial utilization depends primarily on its applicability for pulp production and its use in energy production will be based on the residue that will be available after extracting the pulp fraction of the RCG. Roughly 20 ..30% of the material will be available for energy production purposes. However, the percentage may be higher/lower depending on the quality standards of the pulp fiber material. The harvesting period has a significant effect on the fuel characteristics of RCG. For instance the contents of N, S, Cl, K are clearly lower if the RCG is harvested in the spring (delayed) instead of summer/autumn. These elements affect significantly overall emission formation and ash behaviour and its melting temperature. The combustion related research in this project has been focused on the spring-harvested RCG. The project aims to evaluate the feasibility of delayed harvested RCG for energy production. In order to reach this goal, the following combustion methods will be tested and studied: combustion of pelletized RCG; gasification; combustion of pulverized RCG. In addition, pelletizing, reactivity and NO conversion of pulverized RCG will be studied. The research described here is a part of `Reed Canary Grass` project (in AIR programme). The contractors of the project are Swedish University of Agricultural Sciences (coordinator), United Milling Systems from Denmark, Jaakko Poeyry Oy and VTT Energy. In addition, there are partners from several countries participating in the project. The project has been divided in five tasks, VTT Energy being responsible for combustion related task `Upgraded fuel` that includes the research topics discussed in this paper

  11. Upgraded fuel from reed canary grass

    Energy Technology Data Exchange (ETDEWEB)

    Heiskanen, V P

    1996-12-31

    The feasibility of RCG for commercial utilization depends primarily on its applicability for pulp production and its use in energy production will be based on the residue that will be available after extracting the pulp fraction of the RCG. Roughly 20 ..30% of the material will be available for energy production purposes. However, the percentage may be higher/lower depending on the quality standards of the pulp fiber material. The harvesting period has a significant effect on the fuel characteristics of RCG. For instance the contents of N, S, Cl, K are clearly lower if the RCG is harvested in the spring (delayed) instead of summer/autumn. These elements affect significantly overall emission formation and ash behaviour and its melting temperature. The combustion related research in this project has been focused on the spring-harvested RCG. The project aims to evaluate the feasibility of delayed harvested RCG for energy production. In order to reach this goal, the following combustion methods will be tested and studied: combustion of pelletized RCG; gasification; combustion of pulverized RCG. In addition, pelletizing, reactivity and NO conversion of pulverized RCG will be studied. The research described here is a part of `Reed Canary Grass` project (in AIR programme). The contractors of the project are Swedish University of Agricultural Sciences (coordinator), United Milling Systems from Denmark, Jaakko Poeyry Oy and VTT Energy. In addition, there are partners from several countries participating in the project. The project has been divided in five tasks, VTT Energy being responsible for combustion related task `Upgraded fuel` that includes the research topics discussed in this paper

  12. WNP-2 core model upgrade

    International Nuclear Information System (INIS)

    Golightly, C.E.; Ravindranath, T.K.; Belblidia, L.A.; O'Farrell, D.; Andersen, P.S.

    2006-01-01

    The paper describes the core model upgrade of the WNP-2 training simulator and the reasons for the upgrade. The core model as well as the interface with the rest of the simulator are briefly described . The paper also describes the procedure that will be used by WNP-2 to update the simulator core data after future core reloads. Results from the fully integrated simulator are presented. (author)

  13. Study with one global crab cavity at IR4 for LHC Upgrade

    CERN Document Server

    Barranco, J; Morita, A; Ralph Assmann, R; Sun, Y; Tomás, R; Weiler, T; Zimmermann, F; CERN. Geneva. BE Department

    2009-01-01

    In this note, we discuss the possible installation and impact on the beam of a single global crab cavity (CC) for both nominal LHC optics and one upgrade LHC optics (Lowbetamax). We also summarize the results on dynamic aperture tracking, luminosity, expected closed orbits, preliminary studies on collimation cleaning efficiency, and the emittance growth due to crab cavity ramping and other sources.

  14. Upgrades to the ATLAS trigger system   

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00221618; The ATLAS collaboration

    2017-01-01

    In coming years the LHC is expected to undergo upgrades to increase both the energy of proton-proton collisions and the instantaneous luminosity. In order to cope with these more challenging LHC conditions, upgrades of the ATLAS trigger system will be required. This talk will focus on some of the key aspects of these upgrades. Firstly, the upgrade period between 2019-2021 will see an increase in instantaneous luminosity to $3\\times10^{34} \\rm{cm^{-2}s^{-1}}$. Upgrades to the Level 1 trigger system during this time will include improvements for both the muon and calorimeter triggers. These include the upgrade of the first-level Endcap Muon trigger, the calorimeter trigger electronics and the addition of new calorimeter feature extractor hardware, such as the Global Feature Extractor (gFEX). An overview will be given on the design and development status the aforementioned systems, along with the latest testing and validation results. By 2026, the High Luminosity LHC will be able to deliver 14 TeV collisions wit...

  15. Performance of the Prototype Readout System for the CMS Endcap Hadron Calorimeter Upgrade

    Science.gov (United States)

    Chaverin, Nate; Dittmann, Jay; Hatakeyama, Kenichi; Pastika, Nathaniel; CMS Collaboration

    2016-03-01

    The Compact Muon Solenoid (CMS) experiment at the CERN Large Hadron Collider (LHC) will upgrade the photodetectors and readout systems of the endcap hadron calorimeter during the technical stop scheduled for late 2016 and early 2017. A major milestone for this project was a highly successful testbeam run at CERN in August 2015. The testbeam run served as a full integration test of the electronics, allowing a study of the response of the preproduction electronics to the true detector light profile, as well as a test of the light yield of various new plastic scintillator materials. We present implications for the performance of the hadron calorimeter front-end electronics based on testbeam data, and we report on the production status of various components of the system in preparation for the upgrade.

  16. Tracking single dynamic MEG dipole sources using the projected Extended Kalman Filter.

    Science.gov (United States)

    Yao, Yuchen; Swindlehurst, A Lee

    2011-01-01

    This paper presents two new algorithms based on the Extended Kalman Filter (EKF) for tracking the parameters of single dynamic magnetoencephalography (MEG) dipole sources. We assume a dynamic MEG dipole source with possibly both time-varying location and dipole orientation. The standard EKF-based tracking algorithm performs well under the assumption that the dipole source components vary in time as a Gauss-Markov process, provided that the background noise is temporally stationary. We propose a Projected-EKF algorithm that is adapted to a more forgiving condition where the background noise is temporally nonstationary, as well as a Projected-GLS-EKF algorithm that works even more universally, when the dipole components vary arbitrarily from one sample to the next.

  17. Design concepts for the reactor protection and control process instrumentation digital upgrade project at the Donald C. Cook Nuclear Plant units 1 and 2

    International Nuclear Information System (INIS)

    Carruth, R.C.; Sotos, W.G.

    1996-01-01

    As the nation's nuclear power plants age, the need to consider upgrading of their electronic protection and control systems becomes more urgent. Hardware obsolescence and mechanical wear out resulting from frequent calibration and surveillance play a major role in defining their useful life. At Cook Nuclear Plant, a decision was made to replace a major portion of the plant's protection and control systems with newer technology. This paper describes the engineering processes involved in this successful upgrade and explains the basis for many decisions made while performing the digital upgrade

  18. Absolute calibration of the neutron yield measurement on JT-60 Upgrade

    International Nuclear Information System (INIS)

    Nishitani, Takeo; Takeuchi, Hiroshi; Barnes, C.W.

    1991-10-01

    Absolutely calibrated measurements of the neutron yield are important for the evaluation of the plasma performance such as the fusion gain Q in DD operating tokamaks. Total neutron yield is measured with 235 U and 238 U fission chambers and 3 He proportional counters in JT-60 Upgrade. The in situ calibration was performed by moving the 252 Cf neutron source toroidally through the JT-60 vacuum vessel. Detection efficiencies of three 235 U and two 3 He detectors were measured for 92 locations of the neutron point source in toroidal scans at two different major radii. The total detection efficiency for the torus neutron source was obtained by averaging the point efficiencies over the whole toroidal angle. The uncertainty of the resulting absolute plasma neutron source calibration is estimated to be ± 10%. (author)

  19. Financing Energy Upgrades for K-12 School Districts: A Guide to Tapping into Funding for Energy Efficiency and Renewable Energy Improvements

    Energy Technology Data Exchange (ETDEWEB)

    Goggio Borgeson, Merrian [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Zimring, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division

    2013-04-01

    This guide focuses on clean energy financing options for school administrators, facility managers, and other K-12 school decision makers who are considering investments in high performance school projects. This guide explicitly focuses on comprehensive energy upgrades, those that involve multiple measures and are targeted toward achieving significant energy savings. Successful implementation of clean energy upgrades in schools is a matter of understanding the opportunity, making the commitment, and creatively tapping into available financing. This guide attempts to provide the foundation needed for successful projects in U.S. schools. It walks through the financing options available to K-12 schools and provides case studies of six school districts from around the country.

  20. VVER 1000-NPP Temelin safety upgrading

    International Nuclear Information System (INIS)

    Fleischhans, J.; Ubra, O.

    1995-01-01

    A modernisation program upgrading Temelin plant to meet internationally adopted standard has been implemented during plant design and construction phases. The initial Czech-Russian design (primary system was of Russian design, secondary system was of Czech design) has been extensively modified and adapted to present western safety criteria and operational requirements. The goals are to achieve a high level of safety, reliability, availability and load-following ability. The load-following ability and response to grid frequency changes are very important for the Czech Republic, since the nuclear capacity represents a high proportion of the overall electrical system there. On the basis of IAEA OSART missions and Halliburton NUS audit results and in compliance with recommendations of The State Office for Nuclear Safety, Czech Power Company and Czech scientists and researchers a modernisation program project for Temelin has been carried out. It includes three main groups of VVER1000 MW unit innovations: - Modernization and upgrading of the safety and control systems. - Fuel replacement and modification of the reactor core. - Innovation of some components of the primary and secondary systems. The tenders for instrumentation and control system, nuclear fuel, diagnostic system and radiation monitoring system were issued to the world-well known suppliers. The US company Westinghouse Electric >Corporation (WEC) was selected to submit contract for the delivery of instrumentation and control system primary side diagnostic system and for the delivery of nuclear fuel. The contract was signed in 1993