WorldWideScience

Sample records for solution permitted on-site

  1. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  2. Hanford Site air operating permit application

    International Nuclear Information System (INIS)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ''regulated'' pollutants. Regulated pollutants include ''criteria'' pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ''Hazardous'' Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995

  3. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application

    International Nuclear Information System (INIS)

    1993-01-01

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation

  4. Title V Operating Permit: XTO Energy, Inc. - River Bend Dehydration Site

    Science.gov (United States)

    Initial Title V Operating Permit (Permit Number: V-UO-000026-2011.00) and the Administrative Permit Record for the XTO Energy, Inc., River Bend Dehydration Site, located on the Uintah and Ouray Indian Reservation.

  5. Annual Hanford Site Environmental Permitting status report

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    1999-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies

  6. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-24

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation.

  7. Annual Hanford Site Environmental Permitting Status Report

    International Nuclear Information System (INIS)

    HOMAN, N.A.

    2000-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year

  8. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  9. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    International Nuclear Information System (INIS)

    1993-01-01

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation's energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization's ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization's commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans

  10. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-27

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation`s energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization`s ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization`s commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans.

  11. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Science.gov (United States)

    2010-07-01

    ..., storage or disposal facility. If an eligible academic entity makes the hazardous waste determination... hazardous waste permit or interim status as soon as it arrives in the on-site treatment, storage or disposal... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the...

  12. Hanford Site Solid Waste Landfill permit application

    International Nuclear Information System (INIS)

    1991-01-01

    Daily activities at the Hanford Site generate sanitary solid waste (nonhazardous and nonradioactive) that is transported to and permanently disposed of at the Hanford Site Solid Waste Landfill. This permit application describes the manner in which the solid Waste Landfill will be operated under Washington State Department of Ecology Minimum Functional Standards for Solid Waste Handling, Washington Administrative Code 173-304. The solid Waste Landfill is owned by the US Department of Energy -- Richland Operations Office and is used for disposal of solid waste generated at the US Department of Energy Hanford Site. The jurisdictional health department's permit application form for the Solid Waste Landfill is provided in Chapter 1.0. Chapter 2.0 provides a description of the Hanford Site and the Solid Waste Landfill and reviews applicable locational, general facility, and landfilling standards. Chapter 3.0 discusses the characteristics and quantity of the waste disposed of in the Solid Waste Landfill. Chapter 4.0 reviews the regional and site geology and hydrology and the groundwater and vadose zone quality beneath the landfill. Chapters 5.0, 6.0, and 7.0 contain the plan of operation, closure plan, and postclosure plan, respectively. The plan of operation describes the routine operation and maintenance of the Solid Waste Landfill, the environmental monitoring program, and the safety and emergency plans. Chapter 5.0 also addresses the operational cover, environmental controls, personnel requirements, inspections, recordkeeping, reporting, and site security. The postclosure plan describes requirements for final cover maintenance and environmental monitoring equipment following final closure. Chapter 8.0 discusses the integration of closure and postclosure activities between the Solid Waste Landfill and adjacent Nonradioactive Dangerous Waste Landfill. 76 refs., 48 figs, 15 tabs

  13. Early Site Permit Demonstration Program: Plant parameters envelope report

    International Nuclear Information System (INIS)

    1993-03-01

    The Early Site Permit (ESP) Demonstration Program is the nuclear industry's initiative for piloting the early resolution of siting-related issues before the detailed design proceedings of the combined operating license review. The ESP Demonstration Program consists of three phases. The plant parameters envelopes task is part of Phase 1, which addresses the generic review of applicable federal regulations and develops criteria for safety and environmental assessment of potential sites. The plant parameters envelopes identify parameters that characterize the interface between an ALWR design and a potential site, and quantify the interface through values selected from the Utility Requirements Documents, vendor design information, or engineering assessments. When augmented with site-specific information, the plant parameters envelopes provide sufficient information to allow ESPs to be granted based on individual ALWR design information or enveloping design information for the evolutionary, passive, or generic ALWR plants. This document is expected to become a living document when used by future applicants

  14. Regulatory Review of Early Site Permit Applications

    International Nuclear Information System (INIS)

    Scott, Michael L.

    2004-01-01

    The U.S. Nuclear Regulatory Commission (NRC) has received and is reviewing three applications for early site permits (ESPs). The ESP process allows early resolution of site-related issues affecting possible construction and operation of a new nuclear power plant. The nuclear industry views a successful and predictable ESP process as an important step in assessing whether to seek authorization to construct and operate a new generation of nuclear power reactors in the United States. Because consideration of ESP applications is a first-of-a-kind activity, a number of issues have emerged prior to and during the reviews of the first three applications. Issues have included the need for design information at the ESP stage, accident analyses, quality assurance, and seismic analyses. The NRC has been working to resolve identified issues to support a Commission decision on whether to issue an ESP approximately 33-37 months after receipt of each ESP application. (authors)

  15. 76 FR 81986 - Honeywell International, Inc., Automation and Control Solutions Division, Including On-Site...

    Science.gov (United States)

    2011-12-29

    ..., Inc., Automation and Control Solutions Division, Including On-Site Leased Workers From Manpower...., Automation and Control Solutions Division. The Department has determined that these workers were sufficiently...., Automation and Control Solutions Division, including on-site leased workers from Manpower, Spherion...

  16. Hanford Site Solid Waste Landfill permit application. Revision 1

    International Nuclear Information System (INIS)

    1993-01-01

    Both nonhazardous and nonradioactive sanitary solid waste are generated at the Hanford Site. This permit application describes the manner in which the Solid Waste Landfill will be operated. A description is provided of the landfill, including applicable locational, general facility, and landfilling standards. The characteristics and quantity of the waste disposed of are discussed. The regional and site geology and hydrology and the groundwater and vadose zone quality beneath the landfill are reviewed. A plan is included of operation, closure, and postclosure. This report addresses the operational cover, environmental controls, personnel requirements, inspections, recordkeeping, reporting, and site security. The integration of closure and postclosure activities between the Solid Waste Landfill and adjacent Nonradioactive Dangerous Waste Landfill is discussed

  17. Early Site Permit Demonstration Program: Plant parameters envelope report. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    The Early Site Permit (ESP) Demonstration Program is the nuclear industry`s initiative for piloting the early resolution of siting-related issues before the detailed design proceedings of the combined operating license review. The ESP Demonstration Program consists of three phases. The plant parameters envelopes task is part of Phase 1, which addresses the generic review of applicable federal regulations and develops criteria for safety and environmental assessment of potential sites. The plant parameters envelopes identify parameters that characterize the interface between an ALWR design and a potential site, and quantify the interface through values selected from the Utility Requirements Documents, vendor design information, or engineering assessments. When augmented with site-specific information, the plant parameters envelopes provide sufficient information to allow ESPs to be granted based on individual ALWR design information or enveloping design information for the evolutionary, passive, or generic ALWR plants. This document is expected to become a living document when used by future applicants.

  18. 78 FR 19530 - Eastman Kodak Company (GCG), Electrographic Print Solutions, Including On-Site Leased Workers...

    Science.gov (United States)

    2013-04-01

    ... Kodak Company (GCG), Electrographic Print Solutions, Including On-Site Leased Workers From Adecco and Datrose, Spencerport, New York; Eastman Kodak Company, IPS, Including On-Site Leased Workers From Adecco..., 2011, applicable to workers of Eastman Kodak Company (GCG), Electrographic Print Solutions, including...

  19. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    International Nuclear Information System (INIS)

    2010-01-01

    The NTS solid waste disposal sites must be permitted by the state of Nevada Solid Waste Management Authority (SWMA). The SWMA for the NTS is the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). The U.S. Department of Energy's National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as land manager (owner), and National Security Technologies (NSTec), as operator, will store, collect, process, and dispose all solid waste by means that do not create a health hazard, a public nuisance, or cause impairment of the environment. NTS disposal sites will not be included in the Nye County Solid Waste Management Plan. The NTS is located approximately 105 kilometers (km) (65 miles (mi)) northwest of Las Vegas, Nevada (Figure 1). The U.S. Department of Energy (DOE) is the federal lands management authority for the NTS, and NSTec is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS has signs posted along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The Area 5 RWMS is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NTS (Figure 2), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. A Notice of Intent to operate the disposal site as a Class III site was submitted to the state of Nevada on January 28, 1994, and was acknowledged as being received in a letter to the NNSA/NSO on August 30, 1994. Interim approval to operate a Class III SWDS for regulated asbestiform low-level waste (ALLW) was authorized on August 12, 1996 (in letter from Paul Liebendorfer to Runore Wycoff), with operations to be conducted in accordance with the ''Management Plan

  20. 75 FR 77664 - Honeywell International, Inc., Automation and Control Solutions Division, Including On-Site...

    Science.gov (United States)

    2010-12-13

    ..., Inc., Automation and Control Solutions Division, Including On-Site Leased Workers From Manpower... Solutions Division. The Department has determined that these workers were sufficiently under the control of Honeywell International, Inc., Automation and Control Solutions Division to be considered leased workers...

  1. Hydrogen solution in tetrahedral or octahedral interstitial sites in Al

    International Nuclear Information System (INIS)

    Zeng, C.A.; Hu, J.P.; Ouyang, C.Y.

    2011-01-01

    Highlights: → The physical nature of the site preference for H solution in BCC Al is revealed. → The site preference is result of competition between Al-H bonding interaction and local lattice distortion. → The Al-H bonding interaction lowers the solution energy while the local lattice distortion increases the solution energy. - Abstract: It is reported that H atoms prefer to stay at interstitial (defect) sites with larger space in most metals. However, H atom prefers to occupy tetrahedral interstitial sites (T-site) that provide smaller space than octahedral sites (O-site) in Al. This paper studied the H-Al interactions from first principles calculations. Through analysis of the H-induced electronic states and the local atomic relaxations, we show that H-Al bonding interaction is stronger for T-site H, which is in favor of the solution energy. On the other hand, larger local atomic distortion is observed around the T-site H, which increases the total energy.

  2. 78 FR 28642 - Eastman Kodak Company, Electrographic Print Solutions, Including On-Site Leased Workers From...

    Science.gov (United States)

    2013-05-15

    ... Kodak Company, Electrographic Print Solutions, Including On-Site Leased Workers From Adecco and Datrose, Spencerport, New York; Eastman Kodak Company, IPS, Including On-Site Leased Workers From Adecco, Dayton, Ohio... Trade Adjustment Assistance (TAA) filed on behalf of Eastman Kodak Company, Electrographic Print...

  3. The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Wave Energy Devices

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Geerlofs, Simon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanna, Luke A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-06-01

    Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects. Costs have been developed at the pilot scale and for commercial arrays for a surge wave energy converter

  4. 76 FR 13666 - Pitney Bowes, Inc., Mailing Solutions Management, Global Engineering Group, Including On-Site...

    Science.gov (United States)

    2011-03-14

    ...., Mailing Solutions Management, Global Engineering Group, Including On-Site Leased Workers From Guidant... workers and former workers of Pitney Bowes, Inc., Mailing Solutions Management Division, Engineering... reviewed the certification to clarify the subject worker group's identity. Additional information revealed...

  5. Improving regulatory effectiveness in Federal/State siting actions: Federal/State regulatory permitting actions in selected nuclear power station licensing cases

    International Nuclear Information System (INIS)

    Baroff, J.

    1977-06-01

    The Federal/State regulatory permitting actions in 12 case histories of nuclear power station licensing in nine different states are documented. General observations regarding Federal/State siting roles in the siting process are included. Eleven of the case histories are illustrated with a logic network that gives the actions of the utilities in addition to the Federal/State permits

  6. A Note on Market Power in an Emission Permits Market with Banking

    International Nuclear Information System (INIS)

    Liski, M.; Montero, J.P.

    2005-01-01

    In this paper, we investigate the effect of market power on equilibrium path of an emission permits market in which firms can bank current permits for use in later periods. In particular, we study the market equilibrium for a large (potentially dominant) firm and competitive fringe with rational expectations. We characterize the equilibrium solution for different permits allocations and discuss the large firms stock-holding constraints needed for credible market manipulation

  7. 76 FR 2710 - Pitney Bowes, Inc., Mailing Solutions Management Division Including On-Site Leased Workers of...

    Science.gov (United States)

    2011-01-14

    ...., Mailing Solutions Management Division Including On-Site Leased Workers of Guidant Group, and Teleworkers... Bowes, Inc., Mailing Solutions Management Division, Engineering Quality Assurance, Shelton, Connecticut... identity of the subject worker group. The worker group consists of workers of Pitney Bowes, Inc., the...

  8. Early Site Permit, The Assessment of a Site

    International Nuclear Information System (INIS)

    Copete, M.; Cervantes, E.; Sabate, R.

    2010-01-01

    The vast majority of today's power plants were licensed during the 60s, 70s and 80s. Commercial nuclear energy was new, and the regulatory process evolved along with the new industry. Plants were issued a construction permit based on a preliminary design. Safety issues were not fully resolved until the plant was essentially complete, which meant utilities had high risks of increasing costs and schedule as well as the public did not have access to the details of the design until construction was nearly complete. To address these issues, the U.S. Nuclear Regulatory Commission (NRC) in 1989 established a new licensing process: 10 CFR Part 52.

  9. RCRA Part A Permit Application for Waste Management Activities at the Nevada Test Site, Part B Permit Application Hazardous Waste Storage Unit, Nevada Test Site, and Part B Permit Application - Explosives Ordnance Disposal Unit (EODU)

    International Nuclear Information System (INIS)

    2010-01-01

    The Area 5 Hazardous Waste Storage Unit (HWSU) was established to support testing, research, and remediation activities at the Nevada Test Site (NTS), a large-quantity generator of hazardous waste. The HWSU, located adjacent to the Area 5 Radioactive Waste Management Site (RWMS), is a prefabricated, rigid steel-framed, roofed shelter used to store hazardous nonradioactive waste generated on the NTS. No offsite generated wastes are managed at the HWSU. Waste managed at the HWSU includes the following categories: Flammables/Combustibles; Acid Corrosives; Alkali Corrosives; Oxidizers/Reactives; Toxics/Poisons; and Other Regulated Materials (ORMs). A list of the regulated waste codes accepted for storage at the HWSU is provided in Section B.2. Hazardous wastes stored at the HWSU are stored in U.S. Department of Transportation (DOT) compliant containers, compatible with the stored waste. Waste transfer (between containers) is not allowed at the HWSU and containers remain closed at all times. Containers are stored on secondary containment pallets and the unit is inspected monthly. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational Resource Conservation and Recovery Act (RCRA) units at the NTS and their respective regulatory status.

  10. RCRA Part A Permit Application for Waste Management Activities at the Nevada Test Site, Part B Permit Application Hazardous Waste Storage Unit, Nevada Test Site, and Part B Permit Application - Explosives Ordnance Disposal Unit (EODU)

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Programs

    2010-06-17

    The Area 5 Hazardous Waste Storage Unit (HWSU) was established to support testing, research, and remediation activities at the Nevada Test Site (NTS), a large-quantity generator of hazardous waste. The HWSU, located adjacent to the Area 5 Radioactive Waste Management Site (RWMS), is a prefabricated, rigid steel-framed, roofed shelter used to store hazardous nonradioactive waste generated on the NTS. No offsite generated wastes are managed at the HWSU. Waste managed at the HWSU includes the following categories: Flammables/Combustibles; Acid Corrosives; Alkali Corrosives; Oxidizers/Reactives; Toxics/Poisons; and Other Regulated Materials (ORMs). A list of the regulated waste codes accepted for storage at the HWSU is provided in Section B.2. Hazardous wastes stored at the HWSU are stored in U.S. Department of Transportation (DOT) compliant containers, compatible with the stored waste. Waste transfer (between containers) is not allowed at the HWSU and containers remain closed at all times. Containers are stored on secondary containment pallets and the unit is inspected monthly. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational Resource Conservation and Recovery Act (RCRA) units at the NTS and their respective regulatory status.

  11. ESPSD, Nuclear Power Plant Siting Database

    International Nuclear Information System (INIS)

    Slezak, S.

    2001-01-01

    1 - Description of program or function: This database is a repository of comprehensive licensing and technical reviews of siting regulatory processes and acceptance criteria for advanced light water reactor (ALWR) nuclear power plants. The program is designed to be used by applicants for an early site permit or combined construction permit/operating license (10CFRR522), Sub-parts A and C) as input for the development of the application. The database is a complete, menu-driven, self-contained package that can search and sort the supplied data by topic, keyword, or other input. The software is designed for operation on IBM compatible computers with DOS. 2 - Method of solution: The database is an R:BASE Runtime program with all the necessary database files included

  12. 76 FR 73683 - Whirlpool Corporation, Including On-Site Leased Workers From Career Solutions TEC Staffing...

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-74,593] Whirlpool Corporation, Including On-Site Leased Workers From Career Solutions TEC Staffing, Andrews International, IBM Corporation... refrigerators and trash compactors. The notice was published in the Federal Register on October 25, 2010 (75 FR...

  13. 76 FR 72978 - Whirlpool Corporation Including On-Site Leased Workers From Career Solutions TEC Staffing...

    Science.gov (United States)

    2011-11-28

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-74,593] Whirlpool Corporation Including On-Site Leased Workers From Career Solutions TEC Staffing, Andrews International, IBM Corporation... workers are engaged in the production of refrigerators and trash compactors. The notice was published in...

  14. Early Site Permit Demonstration Program: Station design alternatives report

    International Nuclear Information System (INIS)

    1993-03-01

    This report provides the results of investigating the basis for including Station Design Alternatives (SDAs) in the regulatory guidance given for nuclear plant environmental reports (ERs), explains approaches or processes for evaluating SDAs at the early site permit (ESP) stage, and applies one of the processes to each of the ten systems or subsystems considered as SDAS. The key objective o this report s to demonstrate an adequate examination of alternatives can be performed without the extensive development f design data. The report discusses the Composite Suitability Approach and the Established Cutoff Approach in evaluating station design alternatives and selects one of these approaches to evaluate alternatives for each of the plant or station that were considered. Four types of ALWRs have been considered due to the availability of extensive plant data: System 80+, AP600, Advanced Boiling Reactor (ABWR), and Simplified Boiling Water Reactor (SBWR). This report demonstrates the feasibility of evaluating station design alternatives when reactor design detail has not been determined, quantitatively compares the potential ental impacts of alternatives, and focuses the ultimate selection of a alternative on cost and applicant-specific factors. The range of alternatives system is deliberately limited to a reasonable number to demonstrate the or to the three most commonly used at operating plants

  15. The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Oscillating Water Column Wave Energy Devices

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Geerlofs, Simon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanna, Luke A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects, as well as expert opinion of marine environmental research professionals. Cost estimates have been developed at the pilot and commercial scale. The reference model described in this document is an oscillating water column device deployed in Northern California at approximately 50 meters water depth.

  16. B-site substituted solid solutions on the base of sodium-bismuth titanate

    Directory of Open Access Journals (Sweden)

    V. M. Ishchuk

    2016-12-01

    Full Text Available The paper presents results of studies of the formation of phases during the solid-state synthesis in the [(Na0.5Bi0.50.80Ba0.20](Ti1–yByO3 system of solid solutions with B-site substitutions. The substitutions by zirconium, tin and ion complexes (In0.5Nb0.5 and (Fe0.5Nb0.5 have been studied. It has been found that the synthesis is a multi-step process associated with the formation of a number of intermediate phases (depending on the compositions and calcination temperatures. Single-phase solid solutions have been produced at the calcination temperatures in the interval 1000–1100∘C. An increase in the substituting ions concentration leads to a linear increase of the crystal cell size. At the same time, the tolerance factor gets reduced boosting the stability of the antiferroelectric phase as compared to that of the ferroelectric phase.

  17. 75 FR 77665 - Whirlpool Corporation, Including On-Site Leased Workers From Career Solutions TEC Staffing and...

    Science.gov (United States)

    2010-12-13

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-74,593] Whirlpool Corporation, Including On-Site Leased Workers From Career Solutions TEC Staffing and Andrews International, Fort Smith... subject firm. The workers are engaged in the production of refrigerators and trash compactors. The company...

  18. Ci PERMIT

    CERN Multimedia

    Relations with the Host States Service

    1999-01-01

    The Swiss Permanent Mission to the International Organisations at Geneva recalls that only the spouses and children of members of personnel resident in Switzerland and in possession of a legitimation card of types 'B', 'C', 'D' or 'E' issued by the Swiss Federal Department of Foreign Affairs are entitled to benefit from a Ci Permit.The 'demande d'attestation de permis Ci' (request for a Ci permit attestation) can be sent to the Mission only through Personnel Division (Administrative Services, Office 33/1-025).Additional information on access by family members of CERN officials to the Swiss labour market are available to you on the Web site of the Relations with the Host States Service (cf. document entitled 'Employment in Switzerland for spouses and children of CERN officials' dated March 1996).Relations with the Host States Servicehttp://www.cern.ch/relations/Tel. 72848

  19. RCRA Part B permit modifications for cost savings and increased flexibility at the Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    Jierree, C.; Ticknor, K.

    1996-10-01

    With shrinking budgets and downsizing, a need for streamlined compliance initiatives became evident at the Rocky Flats Environmental Technology Site (RFETS). Therefore, Rocky Mountain Remediation Services (RMRS) at the RFETS successfully and quickly modified the RFETS RCRA Part B Permit to obtain significant cost savings and increased flexibility. This 'was accomplished by requesting operations personnel to suggest changes to the Part B Permit which did not diminish overall compliance and which would be most. cost beneficial. The U.S. Department of Energy (DOE) subsequently obtained approval of those changes from the Colorado Department of Public Health and the Environment (CDPHE)

  20. Numerical modelling of solute transport at Forsmark with MIKE SHE. Site descriptive modelling SDM-Site Forsmark

    Energy Technology Data Exchange (ETDEWEB)

    Gustafsson, Lars-Goeran; Sassner, Mona (DHI Sverige AB, Stockholm (Sweden)); Bosson, Emma (Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden))

    2008-12-15

    The Swedish Nuclear Fuel and Waste Management Company (SKB) is performing site investigations at two different locations in Sweden, referred to as the Forsmark and Laxemar areas, with the objective of siting a final repository for high-level radioactive waste. Data from the site investigations are used in a variety of modelling activities. This report presents model development and results of numerical transport modelling based on the numerical flow modelling of surface water and near-surface groundwater at the Forsmark site. The numerical modelling was performed using the modelling tool MIKE SHE and is based on the site data and conceptual model of the Forsmark areas. This report presents solute transport applications based on both particle tracking simulations and advection-dispersion calculations. The MIKE SHE model is the basis for the transport modelling presented in this report. Simulation cases relevant for the transport from a deep geological repository have been studied, but also the pattern of near surface recharge and discharge areas. When the main part of the modelling work presented in this report was carried out, the flow modelling of the Forsmark site was not finalised. Thus, the focus of this work is to describe the sensitivity to different transport parameters, and not to point out specific areas as discharge areas from a future repository (this is to be done later, within the framework of the safety assessment). In the last chapter, however, results based on simulations with the re-calibrated MIKE SHE flow model are presented. The results from the MIKE SHE water movement calculations were used by cycling the calculated transient flow field for a selected one-year period as many times as needed to achieve the desired simulation period. The solute source was located either in the bedrock or on top of the model. In total, 15 different transport simulation cases were studied. Five of the simulations were particle tracking simulations, whereas the rest

  1. 32 CFR 767.9 - Content of permit holder's final report.

    Science.gov (United States)

    2010-07-01

    ... RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE.... The permit holder's final report shall include the following: (a) A site history and a contextual...

  2. Numerical modelling of solute transport at Forsmark with MIKE SHE. Site descriptive modelling SDM-Site Forsmark

    International Nuclear Information System (INIS)

    Gustafsson, Lars-Goeran; Sassner, Mona; Bosson, Emma

    2008-12-01

    The Swedish Nuclear Fuel and Waste Management Company (SKB) is performing site investigations at two different locations in Sweden, referred to as the Forsmark and Laxemar areas, with the objective of siting a final repository for high-level radioactive waste. Data from the site investigations are used in a variety of modelling activities. This report presents model development and results of numerical transport modelling based on the numerical flow modelling of surface water and near-surface groundwater at the Forsmark site. The numerical modelling was performed using the modelling tool MIKE SHE and is based on the site data and conceptual model of the Forsmark areas. This report presents solute transport applications based on both particle tracking simulations and advection-dispersion calculations. The MIKE SHE model is the basis for the transport modelling presented in this report. Simulation cases relevant for the transport from a deep geological repository have been studied, but also the pattern of near surface recharge and discharge areas. When the main part of the modelling work presented in this report was carried out, the flow modelling of the Forsmark site was not finalised. Thus, the focus of this work is to describe the sensitivity to different transport parameters, and not to point out specific areas as discharge areas from a future repository (this is to be done later, within the framework of the safety assessment). In the last chapter, however, results based on simulations with the re-calibrated MIKE SHE flow model are presented. The results from the MIKE SHE water movement calculations were used by cycling the calculated transient flow field for a selected one-year period as many times as needed to achieve the desired simulation period. The solute source was located either in the bedrock or on top of the model. In total, 15 different transport simulation cases were studied. Five of the simulations were particle tracking simulations, whereas the rest

  3. Permit application modifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  4. Permit application modifications

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils

  5. New numerical method for solving the solute transport equation

    International Nuclear Information System (INIS)

    Ross, B.; Koplik, C.M.

    1978-01-01

    The solute transport equation can be solved numerically by approximating the water flow field by a network of stream tubes and using a Green's function solution within each stream tube. Compared to previous methods, this approach permits greater computational efficiency and easier representation of small discontinuities, and the results are easier to interpret physically. The method has been used to study hypothetical sites for disposal of high-level radioactive waste

  6. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  7. ARC Cache: A solution for lightweight Grid sites in ATLAS

    CERN Document Server

    Garonne, Vincent; The ATLAS collaboration

    2016-01-01

    Many Grid sites have the need to reduce operational manpower, and running a storage element consumes a large amount of effort. In addition, setting up a new Grid site including a storage element involves a steep learning curve and large investment of time. For these reasons so-called storage-less sites are becoming more popular as a way to provide Grid computing resources with less operational overhead. ARC CE is a widely-used and mature Grid middleware which was designed from the start to be used on sites with no persistent storage element. Instead, it maintains a local self-managing cache of data which retains popular data for future jobs. As the cache is simply an area on a local posix shared filesystem with no external-facing service, it requires no extra maintenance. The cache can be scaled up as required by increasing the size of the filesystem or adding new filesystems. This paper describes how ARC CE and its cache are an ideal solution for lightweight Grid sites in the ATLAS experiment, and the integr...

  8. 1993 RCRA Part B permit renewal application, Savannah River Site: Volume 10, Consolidated Incineration Facility, Section C, Revision 1

    International Nuclear Information System (INIS)

    Molen, G.

    1993-08-01

    This section describes the chemical and physical nature of the RCRA regulated hazardous wastes to be handled, stored, and incinerated at the Consolidated Incineration Facility (CIF) at the Savannah River Site. It is in accordance with requirements of South Carolina Hazardous Waste Management Regulations R.61-79.264.13(a) and(b), and 270.14(b)(2). This application is for permit to store and teat these hazardous wastes as required for the operation of CIF. The permit is to cover the storage of hazardous waste in containers and of waste in six hazardous waste storage tanks. Treatment processes include incineration, solidification of ash, and neutralization of scrubber blowdown

  9. Numerical Modeling Tools for the Prediction of Solution Migration Applicable to Mining Site

    International Nuclear Information System (INIS)

    Martell, M.; Vaughn, P.

    1999-01-01

    Mining has always had an important influence on cultures and traditions of communities around the globe and throughout history. Today, because mining legislation places heavy emphasis on environmental protection, there is great interest in having a comprehensive understanding of ancient mining and mining sites. Multi-disciplinary approaches (i.e., Pb isotopes as tracers) are being used to explore the distribution of metals in natural environments. Another successful approach is to model solution migration numerically. A proven method to simulate solution migration in natural rock salt has been applied to project through time for 10,000 years the system performance and solution concentrations surrounding a proposed nuclear waste repository. This capability is readily adaptable to simulate solution migration around mining

  10. Heat of solution and site energies of hydrogen in disordered transition-metal alloys

    International Nuclear Information System (INIS)

    Brouwer, R.C.; Griessen, R.

    1989-01-01

    Site energies, long-range effective hydrogen-hydrogen interactions, and the enthalpy of solution in transition-metal alloys are calculated by means of an embedded-cluster model. The energy of a hydrogen atom is assumed to be predominantly determined by the first shell of neighboring metal atoms. The semiempirical local band-structure model is used to calculate the energy of the hydrogen atoms in the cluster, taking into account local deviations from the average lattice constant. The increase in the solubility limit and the weak dependence of the enthalpy of solution on hydrogen concentration in disordered alloys are discussed. Calculated site energies and enthalpies of solution in the alloys are compared with experimental data, and good agreement is found. Due to the strong interactions with the nearest-neighbor metal atoms, hydrogen atoms can be used to determine local lattice separations and the extent of short-range order in ''disordered'' alloys

  11. Actinide solution processing at the Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    1995-04-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1039, for radioactive solution removal and processing at Rocky Flats Environmental Technology Site, Golden, Colorado. The proposal for solution removal and processing is in response to independent safety assessments and an agreement with the State of Colorado to remove mixed residues at Rocky Flats and reduce the risk of future accidents. Monthly public meetings were held during the scoping and preparation of the EA. The scope of the EA included evaluations of alternative methods and locations of solution processing. A comment period from February 20, 1995 through March 21, 1995 was provided to the public and the State of Colorado to offer written comment on the EA. Comments were received from the State of Colorado and the U.S. Environmental Protection Agency. A response to the agency comments is included in the Final EA

  12. The National Solar Permitting Database

    Energy Technology Data Exchange (ETDEWEB)

    2014-08-31

    "The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

  13. Hanford Site storm water comprehensive site compliance evaluation report for the reporting period July 1, 1996 through June 30, 1997

    International Nuclear Information System (INIS)

    Perkins, C.J.

    1997-01-01

    On September 9, 1992, the US Environmental Protection Agency (EPA) issued General Permit No. WA-R-00-OOOF, Authorization to Discharge Under the National Pollutant Discharge Elimination System (NPDES) for Storm Water Discharges Associated with Industrial Activity to the US Department of Energy, Richland Operations Office (RL). RL submitted a Notice of Intent to comply with this permit to EPA in conformance with the General Permit requirements on October 1, 1992. On February 14, 1994, EPA issued a Storm Water General Permit Coverage Notice and assigned WA-R-00-Al7F as the Hanford Site's National Pollutant Discharge Elimination System (NPDES) storm water permit number. The Hanford Site Storm Water Pollution Prevention Plan (SWPPP) (WHC 1996a) was certified by J. E Rasmussen, Director Environmental Assurance, RL, on September 24, 1996, in compliance with Part IV.B(i) of the General Permit. As required by General Permit No. WA-R-00-OOOF (WA-R-00-Al7F), Section IV, Part D, Section 4.c, an annual report must be developed by RL and retained on site to verify that the requirements listed in the General Permit are being implemented. The previous Hanford Site Storm Plater Comprehensive Site Compliance Evaluation Report (WHC 1996b) addressed the period from July 1995 through June 1996. This document fulfills the requirement to prepare an annual report and contains the results of inspections of the storm water outfalls listed in the SWPPP (WHC 1996a). This report also describes the methods used to conduct the 1100 Storm Plater Comprehensive Site Compliance Evaluation (SWCSCE) as required in Part IV, Section D.4.c in the General Permit; summarizes the results of the compliance evaluation; and documents significant leaks and spills. The reporting year for this SWCSCE report is July 1, 1996 through June 30, 1997

  14. Offshore Wind Energy Permitting: A Survey of U.S. Project Developers

    Energy Technology Data Exchange (ETDEWEB)

    Van Cleve, Frances B.; Copping, Andrea E.

    2010-11-30

    The U.S. Department of Energy (DOE) has adopted a goal to generate 20% of the nation’s electricity from wind power by 2030. Achieving this “20% Wind Scenario” in 2030 requires acceleration of the current rate of wind project development. Offshore wind resources contribute substantially to the nation’s wind resource, yet to date no offshore wind turbines have been installed in the U.S. Progress developing offshore wind projects has been slowed by technological challenges, uncertainties about impacts to the marine environment, siting and permitting challenges, and viewshed concerns. To address challenges associated with siting and permitting, Pacific Northwest National Laboratory (PNNL) surveyed offshore wind project developers about siting and project development processes, their experience with the environmental permitting process, and the role of coastal and marine spatial planning (CMSP) in development of the offshore wind industry. Based on the responses to survey questions, we identify several priority recommendations to support offshore wind development. Recommendations also include considerations for developing supporting industries in the U.S. and how to use Coastal and Marine Spatial Planning (CMSP) to appropriately consider ocean energy among existing ocean uses. In this report, we summarize findings, discuss the implications, and suggest actions to improve the permitting and siting process.

  15. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  16. Double-shell tank system dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This Double-Shell Tank System Dangerous Waste Permit Application should be read in conjunction with the 242-A Evaporator Dangerous Waste Permit Application and the Liquid Effluent Retention Facility Dangerous Waste Permit Application, also submitted on June 28, 1991. Information contained in the Double-Shell Tank System permit application is referenced in the other two permit applications. The Double-Shell Tank System stores and treats mixed waste received from a variety of sources on the Hanford Site. The 242-A Evaporator treats liquid mixed waste received from the double-shell tanks. The 242-A Evaporator returns a mixed-waste slurry to the double-shell tanks and generates the dilute mixed-waste stream stored in the Liquid Effluent Retention Facility. This report contains information on the following topics: Facility Description and General Provisions; Waste Characteristics; Process Information; Groundwater Monitoring; Procedures to Prevent Hazards; Contingency Plan; Personnel Training; Exposure Information Report; Waste Minimization Plan; Closure and Postclosure Requirements; Reporting and Recordkeeping; other Relevant Laws; and Certification. 150 refs., 141 figs., 118 tabs

  17. On-Site or Off-Site Renewable Energy Supply Options?

    DEFF Research Database (Denmark)

    Marszal, Anna Joanna; Heiselberg, Per; Jensen, Rasmus Lund

    2012-01-01

    The concept of a Net Zero Energy Building (Net ZEB) encompasses two options of supplying renewable energy, which can offset energy use of a building, in particular on-site or off-site renewable energy supply. Currently, the on-site options are much more popular than the off-site; however, taking...... into consideration the limited area of roof and/or façade, primarily in the dense city areas, the Danish weather conditions, the growing interest and number of wind turbine co-ops, the off-site renewable energy supply options could become a meaningful solution for reaching ‘zero’ energy goal in the Danish context...... five technologies, i.e., two on-site options: (1) photovoltaic, (2) micro combined heat and power, and three off-site options: (1) off-site windmill, (2) share of a windmill farm and (3) purchase of green energy from the 100% renewable utility grid. The results indicate that in case of the on...

  18. VM-based infrastructure for simulating different cluster and storage solutions used on ATLAS Tier-3 sites

    International Nuclear Information System (INIS)

    Belov, S; Kadochnikov, I; Korenkov, V; Kutouski, M; Oleynik, D; Petrosyan, A

    2012-01-01

    The current ATLAS Tier-3 infrastructure consists of a variety of sites of different sizes and with a mix of local resource management systems (LRMS) and mass storage system (MSS) implementations. The Tier-3 monitoring suite, having been developed in order to satisfy the needs of Tier-3 site administrators and to aggregate Tier-3 monitoring information on the global VO level, needs to be validated for various combinations of LRMS and MSS solutions along with the corresponding Ganglia plugins. For this purpose the testbed infrastructure, which allows simulation of various computational cluster and storage solutions, had been set up at JINR (Dubna, Russia). This infrastructure provides the ability to run testbeds with various LRMS and MSS implementations, and with the capability to quickly redeploy particular testbeds or their components. Performance of specific components is not a critical issue for development and validation, whereas easy management and deployment are crucial. Therefore virtual machines were chosen for implementation of the validation infrastructure which, though initially developed for Tier-3 monitoring project, can be exploited for other purposes. Load generators for simulation of the computing activities at the farm were developed as a part of this task. The paper will cover concrete implementation, including deployment scenarios, hypervisor details and load simulators.

  19. State waste discharge permit application for the 200 Area Effluent Treatment Facility and the State-Approved Land Disposal Site

    International Nuclear Information System (INIS)

    1993-08-01

    Application is being made for a permit pursuant to Chapter 173--216 of the Washington Administrative Code (WAC), to discharge treated waste water and cooling tower blowdown from the 200 Area Effluent Treatment Facility (ETF) to land at the State-Approved Land Disposal Site (SALDS). The ETF is located in the 200 East Area and the SALDS is located north of the 200 West Area. The ETF is an industrial waste water treatment plant that will initially receive waste water from the following two sources, both located in the 200 Area on the Hanford Site: (1) the Liquid Effluent Retention Facility (LERF) and (2) the 242-A Evaporator. The waste water discharged from these two facilities is process condensate (PC), a by-product of the concentration of waste from DSTs that is performed in the 242-A Evaporator. Because the ETF is designed as a flexible treatment system, other aqueous waste streams generated at the Hanford Site may be considered for treatment at the ETF. The origin of the waste currently contained in the DSTs is explained in Section 2.0. An overview of the concentration of these waste in the 242-A Evaporator is provided in Section 3.0. Section 4.0 describes the LERF, a storage facility for process condensate. Attachment A responds to Section B of the permit application and provides an overview of the processes that generated the wastes, storage of the wastes in double-shell tanks (DST), preliminary treatment in the 242-A Evaporator, and storage at the LERF. Attachment B addresses waste water treatment at the ETF (under construction) and the addition of cooling tower blowdown to the treated waste water prior to disposal at SALDS. Attachment C describes treated waste water disposal at the proposed SALDS

  20. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada National Security Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    International Nuclear Information System (INIS)

    2010-01-01

    The Nevada National Security Site (NNSS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NNSS and National Security Technologies, LLC (NSTec) is the Management and Operations contractor. Access on and off the NNSS is tightly controlled, restricted, and guarded on a 24-hour basis. The NNSS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NNSS. The Area 5 Radioactive Waste Management Site (RWMS) is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NNSS (Figure 1), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. The site will be used for the disposal of regulated Asbestiform Low-Level Waste (ALLW), small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains Polychlorinated Biphenyl (PCB) Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. Waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM) and PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water. The term asbestiform is

  1. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada National Security Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Programs

    2010-10-04

    The Nevada National Security Site (NNSS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NNSS and National Security Technologies, LLC (NSTec) is the Management and Operations contractor. Access on and off the NNSS is tightly controlled, restricted, and guarded on a 24-hour basis. The NNSS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NNSS. The Area 5 Radioactive Waste Management Site (RWMS) is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NNSS (Figure 1), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. The site will be used for the disposal of regulated Asbestiform Low-Level Waste (ALLW), small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains Polychlorinated Biphenyl (PCB) Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. Waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM) and PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water. The term asbestiform is

  2. Low-Level Burial Grounds Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1989-01-01

    The single dangerous waste permit identification number issued to the Hanford Site by the US Environmental Protection Agency and the Washington State Department of Ecology is US Environmental Protection Agency/State Identification Number WA 7890008967. This identification number encompasses a number of waste management units within the Hanford Site. Westinghouse Hanford Company is a major contractor to the US Department of Energy-Richland Operations Office and serves as co-operator of the Low-Level Burial Grounds, the waste management unit addressed by this permit application. The Low-Level Burial Grounds Dangerous Waste Permit Application consists of both a Part A and a Part B Permit Application. The original Part A, submitted in November 1985, identified landfills, retrievable storage units, and reserved areas. An explanation of subsequent Part A revisions is provided at the beginning of the Part A section. Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology

  3. 78 FR 24305 - Actions on Special Permit Applications

    Science.gov (United States)

    2013-04-24

    ... special permit Lincoln, NE. to authorize an alternative fire protection system. 11624-M Clean Harbors 49... Special Permit Applications AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of actions on Special Permit Applications. SUMMARY: In accordance with the procedures...

  4. State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0

    International Nuclear Information System (INIS)

    1995-11-01

    On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology

  5. State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology.

  6. 32 CFR 767.7 - Conditions of permits.

    Science.gov (United States)

    2010-07-01

    ... GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE JURISDICATION OF THE... to submit to NHC a working and diving log listing days spent in field research, activities pursued... protect all sensitive information regarding the location and character of the wreck site that could...

  7. On site clean up with a hazardous waste incinerator

    International Nuclear Information System (INIS)

    Cross, F.L. Jr.; Tessitore, J.L.

    1987-01-01

    The Army Corps of Engineers and the EPA have determined that on-site incineration for the detoxification of soils, sediments, and sludges is a viable, safe, and economic alternative. This paper discusses an approach to on-site incineration as a method of detoxification of soils/sediments contaminated with organic hazardous wastes. Specifically, this paper describes the procedures used to evaluate on-site incineration at a large Superfund site with extensive PCB contaminated soils and sediments. The paper includes the following: (1) a discussion of site waste quantities and properties, (2) a selection of an incineration technology with a resulting concept and design, (3) a discussion of incinerator permitting requirements, (4) discussion and rationale for an incinerator sub-scale testing approach, and (5) analysis of on-site incineration cost

  8. Controls on accumulation and soil solution partitioning of heavy metals across upland sites in United Kingdom (UK).

    Science.gov (United States)

    Zia, Afia; van den Berg, Leon; Ahmad, Muhammad Nauman; Riaz, Muhammad; Zia, Dania; Ashmore, Mike

    2018-05-31

    A significant body of knowledge suggests that soil solution pH and dissolved organic carbon (DOC) strongly influence metal concentrations and speciation in porewater, however, these effects vary between different metals. This study investigated the factors influencing soil and soil solution concentrations of copper (Cu), lead (Pb), nickel (Ni) and zinc (Zn) under field conditions in upland soils from UK having a wide range of pH, DOC and organic matter contents. The study primarily focussed on predicting soil and soil solution metal concentrations from the data on total soil metal concentrations (HNO 3 extracts) and soil and soil solution properties (pH, DOC and organic matter content). We tested the multiple regression models proposed by Tipping et al. (2003) to predict heavy metal concentrations in soil solutions and the results indicated a better fit (higher R 2 values) in both studies for Pb compared to the Zn and Cu concentrations. Both studies observed consistent negative relationships of metals with pH and loss on ignition (LOI) suggesting an increase in soil solution metal concentrations with increasing acidity. The positive relationship between Pb concentrations in porewater and HNO 3 extracts was similar for both studies, however, similar relationships were not found for the Zn and Cu concentrations because of the negative coefficients for these metals in our study. The results of this study conclude that the predictive equations of Tipping et al. (2003) may not be applicable to the field sites where the range of DOC and metal concentrations is much lower than their study. Our study also suggests that the extent to which metals are partitioned into soil solution is lower in soils with a higher organic matter contents due to binding of these metals to soil organic matter. Copyright © 2018 Elsevier Ltd. All rights reserved.

  9. Waste Feed Delivery Environmental Permits and Approvals Plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    2000-01-01

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches

  10. Resource Conservation and Recovery Act: Part B, Permit application

    International Nuclear Information System (INIS)

    1992-03-01

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements

  11. Waste Feed Delivery Environmental Permits and Approvals Plan

    Energy Technology Data Exchange (ETDEWEB)

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  12. Parking regulations on the CERN sites

    CERN Multimedia

    General Infrastructure Services Department

    2010-01-01

    The site surveillance service is also responsible for supervising compliance with the parking regulations on the CERN site. In that context, it ensures that the following rules are complied with on the CERN car park: Vehicles may not be left on a CERN car park for longer than 5 consecutive working days. However, CERN users are entitled to leave their vehicles parked at CERN for a longer period in the car park near Building 588 , subject to completing the application form "Demande d'autorisation pour un stationnement de longue durée" (application for a long-term parking permit) and sending it to the Reception and Access Control Service (access.surveillance@cern.ch) prior to departure.   Parking spaces, which are in short supply in many crowded areas of the CERN site, must not be occupied by abandoned vehicles/wrecks. The service organizes the disposal of such vehicles. Any CERN users wishing to get rid of a private vehicle parked on one of the CERN car pa...

  13. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) is an existing treatment, storage, and/or disposal (TSD) unit located in the 200 East Area and the adjacent 600 Area of the Hanford Site. The GTF mixes dry cementitious solids with liquid mixed waste (containing both dangerous and radioactive constituents) produced by Hanford Site operations. The GTF consists of the following: The 241-AP-02D and 241-AP-04D waste pump pits and transfer piping; Dry Materials Facility (DMF); Grout Disposal Facility (GDF), consisting of the disposal vault and support and monitoring equipment; and Grout Processing Facility (GPF) and Westinghouse Hanford Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The Grout Treatment Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this TSD unit, including the current revision, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings

  14. Moral concerns on tradable pollution permits in international environmental agreements

    Energy Technology Data Exchange (ETDEWEB)

    Eyckmans, Johan [Hogeschool-Universiteit Brussel - HUB, Stormstraat 2, B-1000 Brussels (Belgium); Katholieke Universiteit Leuven, Centrum voor Economische Studien Naamsestraat 69, 3000 Leuven (Belgium); Kverndokk, Snorre [Ragnar Frisch Centre for Economic Research, Gaustadalleen 21, 0349 Oslo (Norway)

    2010-07-15

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  15. Moral concerns on tradable pollution permits in international environmental agreements

    International Nuclear Information System (INIS)

    Eyckmans, Johan; Kverndokk, Snorre

    2010-01-01

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  16. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  17. FIRE PERMIT NOW ON EDH!

    CERN Multimedia

    TIS General Safety Group or

    2001-01-01

    The electronic version of the Fire Permit form is now active. The aim of the Fire Permit procedure is to reduce the risk of fire or explosion. It is mandatory when performing 'hot work' (mainly activities which involve the use of naked flames or other heat sources - e.g. welding, brazing, cutting, grinding, etc.). Its use is explained in the CERN Fire Protection Code E. (Fire Protection) The new electronic form, which is substantially unchanged from the previous authorizing procedure, will be available on the Electronic Document Handling system (https://edh.cern.ch/) as of 1st September 2001. From this date use of the paper version should be discontinued.

  18. General-purpose chemical analyzer for on-line analyses of radioactive solutions

    International Nuclear Information System (INIS)

    Spencer, W.A.; Kronberg, J.W.

    1983-01-01

    An automated analyzer is being developed to perform analytical measurements on radioactive solutions on-line in a hostile environment. This General Purpose Chemical Analyzer (GPCA) samples a process stream, adds reagents, measures solution absorbances or electrode potentials, and automatically calculates the results. The use of modular components, under microprocessor control, permits a single analyzer design to carry out many types of analyses. This paper discusses the more important design criteria for the GPCA, and describes the equipment being tested in a prototype unit

  19. Methods for estimating on-site ambient air concentrations at disposal sites

    International Nuclear Information System (INIS)

    Hwang, S.T.

    1987-01-01

    Currently, Gaussian type dispersion modeling and point source approximation are combined to estimate the ambient air concentrations of pollutants dispersed downwind of an areawide emission source, using the approach of virtual point source approximation. This Gaussian dispersion modeling becomes less accurate as the receptor comes closer to the source, and becomes inapplicable for the estimation of on-site ambient air concentrations at disposal sites. Partial differential equations are solved with appropriate boundary conditions for use in estimating the on-site concentrations in the ambient air impacted by emissions from an area source such as land disposal sites. Two variations of solution techniques are presented, and their predictions are compared

  20. Resource Conservation and Recovery Act, Part B, Permit Application

    International Nuclear Information System (INIS)

    1991-01-01

    This report is part of the permit application for the WIPP facility. Appendices are presented on the following: the design validation final report; sampling of volatile organic compounds which may be emitted from waste binss, site supplementary roof support system, and studies on wind and tornado probabilities

  1. State Waste Discharge Permit application, 100-N Sewage Lagoon

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond

  2. Subcutaneous drug infusions: a review of problems and solutions.

    Science.gov (United States)

    Mitten, T

    2001-02-01

    Subcutaneous drug infusion using a portable syringe driver has had a significant impact on patient comfort in palliative care. It permits the continuous delivery of a range of drug therapies, so bypassing problems of dysphagia, weakness and the inability of many patients in the terminal phase to take oral medication. The devices are not problem-free, however. Mechanical problems, reactions at the infusion site and difficulties with the mixing of drugs in the syringe are all widely recognized. This article reviews some general issues with the operation of portable syringe drivers, and discusses a range of potential problems and their solutions.

  3. Action for declaration of annulment of reactor construction permit dismissed

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    The Higher Administrative Court of Rheinland Pfalz has confirmed two decisions by the Koblenz Administrative Court dismissing an actions to declare the annulment of the partial construction permit issued for the Muelheim-Kaerlich reactor. Appeal was not admitted. The plaintiffs, who are under age and were represented by their father, are permanently resident in Schleswig-Holstein, at about 470 km from the site and have a further residence in Mainz, about 60 km away from the site. They plead to have a legitimate interest in the declaration of nullity on the grounds of the uncertainty created in legal matters by the delivery of the permit and its being unconstitutional as well as for ideological and religious reasons. The ruling deals also with the importance of the distance from the site of a nuclear reactor, which is considered to be such as to exclude the 'necessary spatial relation'. (orig./HP) [de

  4. State Waste Discharge Permit Application: Electric resistance tomography testing

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks.

  5. State Waste Discharge Permit Application: Electric resistance tomography testing

    International Nuclear Information System (INIS)

    1994-04-01

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks

  6. Risk assessment-led characterisation of the SiteChar UK north sea site for the geological storage of CO2

    International Nuclear Information System (INIS)

    Akhurst, Maxine; Hannis, Sarah D.; Quinn, Martyn F.; Long, David; Shi, Ji-Quan; Koenen, Marielle; Pluymaekers, Maarten; Delprat-Jannaud, Florence; Lecomte, Jean-Claude; Bossie-Codreanu, Daniel; Nagy, Stanislaw; Klimkowski, Lukas; Gei, Davide

    2015-01-01

    Risk assessment-led characterisation of a site for the geological storage of CO 2 in the UK northern North Sea was performed for the EU SiteChar research project as one of a portfolio of sites. Implementation and testing of the SiteChar project site characterisation work-flow has produced a 'dry-run' storage permit application that is compliant with regulatory requirements. A site suitable for commercial-scale storage was characterised, compatible with current and future industrial carbon dioxide (CO 2 ) sources in the northern UK. Pre-characterisation of the site, based on existing information acquired during hydrocarbon exploration and production, has been achieved from publicly available data. The project concept is to store captured CO 2 at a rate of 5 Mt per year for 20 years in the Blake Oil Field and surrounding Captain Sandstone saline aquifer. This commercial-scale storage of 100 Mt CO 2 can be achieved through a storage scenario combining injection of CO 2 into the oil field and concurrent water production down-dip of the field. There would be no encroachment of supercritical phase CO 2 for more than two kilometres beyond the field boundary and no adverse influence on operating hydrocarbon fields provided there is pressure management. Components of a storage permit application for the site are presented, developed as far as possible within a research project. Characterisation and technical investigations were guided by an initial assessment of perceived risks to the prospective site and a need to provide the information required for the storage permit application. The emphasis throughout was to reduce risks and uncertainty on the subsurface containment of stored CO 2 , particularly with respect to site technical performance, monitoring and regulatory issues, and effects on other resources. The results of selected risk assessment-led site characterisation investigations and the subsequent risk reassessments are described together with their

  7. The influence of the "cage" effect on the mechanism of reversible bimolecular multistage chemical reactions proceeding from different sites in solutions.

    Science.gov (United States)

    Doktorov, Alexander B

    2016-08-28

    Manifestations of the "cage" effect at the encounters of reactants have been theoretically treated on the example of multistage reactions (including bimolecular exchange reactions as elementary stages) proceeding from different active sites in liquid solutions. It is shown that for reactions occurring near the contact of reactants, consistent consideration of quasi-stationary kinetics of such multistage reactions (possible in the framework of the encounter theory only) can be made on the basis of chemical concepts of the "cage complex," just as in the case of one-site model described in the literature. Exactly as in the one-site model, the presence of the "cage" effect gives rise to new channels of reactant transformation that cannot result from elementary event of chemical conversion for the given reaction mechanism. Besides, the multisite model demonstrates new (as compared to one-site model) features of multistage reaction course.

  8. Case study: Montclair/West Orange and Glen Ridge Radium Superfund sites

    International Nuclear Information System (INIS)

    Pezzella, R.; Seppi, P.; Watson, D.

    1994-01-01

    The Montclair/West Orange and Glen Ridge Radium Sites are located 12 miles west of New York City in three residential communities in Essex County, New Jersey. The sites are contaminated with waste materials from a local radium processing facility which ceased operations in 1926. Houses were subsequently constructed on or near the radium waste disposal areas. The waste material was also used as backfill, which caused contamination to be spread randomly over the communities. There are 769 properties between four townships that comprise the Superfund sites. The Environmental Protection Agency (EPA) conducted an aerial survey in 1981 which identified the boundaries of the sites. In 1985, the New Jersey Department of Environmental Protection (NJDEP) began a pilot study to examine the feasibility of excavation and off-site disposal of contaminated material as a permanent solution. The study was interrupted when the permit for the disposal site was revoked by the state of Nevada. Since 1990 field testing has been completed on over 725 properties and remediation and restoration has been completed on 75 properties

  9. CERN single sign on solution

    International Nuclear Information System (INIS)

    Ormancey, E

    2008-01-01

    The need for Single Sign On has always been restricted by the absence of cross platform solutions: a single sign on working only on one platform or technology is nearly useless. The recent improvements in Web Services Federation (WS-Federation) standard enabling federation of identity, attribute, authentication and authorization information can now provide real extended Single Sign On solutions. Various solutions have been investigated at CERN and now, a Web SSO solution using some parts of WS-Federation technology is available. Using the Shibboleth Service Provider module for Apache hosted web sites and Microsoft ADFS as the identity provider linked to Active Directory user, users can now authenticate on any web application using a single authentication platform, providing identity, user information (building, phone...) as well as group membership enabling authorization possibilities. A typical scenario: a CERN user can now authenticate on a Linux/Apache website using Windows Integrated credentials, and his Active Directory group membership can be checked before allowing access to a specific web page

  10. The influence of disposal capacity on the course of site remediation

    International Nuclear Information System (INIS)

    Eng, J.

    1999-01-01

    The availability of, or more accurately the lack of, disposal capacity has altered the course of decontamination and decommissioning of radioactively contaminated sites. Political sensitivities in the 1970s caused a congressional restructuring of the disposal system in the United States. At the same time, the 1970s saw a movement towards reexamining many previously decontaminated facilities with a new emphasis on environmental protection. A reexamination of accessibility to disposal capacity began in the 1980s because the three states with disposal facilities wanted to restrict use of their facilities and create new capacity in other states. The passage of the federal Low-Level Radioactive Waste Policy Act and Amendments Act permitted states to form compacts to restrict use of disposal facilities in their region. The Amendments Act also permitted the collection of surcharges that ultimately increased the cost of disposal by 300% within a decade. Radioactive facilities that were reevaluated include radium facilities of the first decades of the Twentieth Century, government and private facilities that took part in atomic weapon development during the World War II era, and older facilities licensed under the Atomic Energy Act in the latter half of the century. The reevaluations resulted in modern day conclusions that further remedial actions may be needed. The solution appeared straightforward: removal of the radiological contamination that is in excess of current day environmental standards. The large volumes of slightly contaminated debris and the limited, costly disposal capacity have created a need for alternatives to excavation and removal. Some of the techniques have created opportunities such as specialized disposal sites (e.g., Envirocare), reuse of contaminated metals, more aggressive decontamination processes, and recycling (e.g., mill reprocessing). (author)

  11. Binding and preclusive effect of part-construction permits and preliminary licenses

    International Nuclear Information System (INIS)

    Jarass, H.D.

    1983-01-01

    This contribution discusses the binding and preclusive effect of part-construction permits and preliminary licenses granted in accordance with the laws on air pollution abatement and the Atomic Energy Act. The author states that the granting of a part-construction permit must be based on a final decision over the entire project and must include a preliminary judgement and evaluation of the entire project, also covering site selection and design concept approval. The binding effort and preclusive effect of part-permits are examined in great detail, namely their definition, basic principles, extent, coming into force and term of validity and, (for the preclusive effect), its prerequisites, consequences, considerations regarding immediate execution). The author concludes by stating that there is no difference in regard to binding or preclusive effect between part-construction permits and a preliminary licence. (HP) [de

  12. 9 CFR 72.13 - Permitted dips and procedures.

    Science.gov (United States)

    2010-01-01

    ... proprietary brands of permitted dips—as well the use of compressed air, vat management techniques, and other... maintained and that under actual field conditions the dipping of cattle with a solution of definite strength...

  13. State Waste Discharge Permit application for industrial discharge to land: 200 East Area W-252 streams

    International Nuclear Information System (INIS)

    1993-12-01

    This document constitutes the WAC 173-216 State Waste Discharge Permit application for six W-252 liquid effluent streams at the Hanford Site. Appendices B through H correspond to Section B through H in the permit application form. Within each appendix, sections correspond directly to the respective questions on the application form. The appendices include: Product or service information; Plant operational characteristics; Water consumption and waterloss; Wastewater information; Stormwater; Other information; and Site assessment

  14. Optimizing the deposition of hydrogen evolution sites on suspended semiconductor particles using on-line photocatalytic reforming of aqueous methanol solutions.

    Science.gov (United States)

    Busser, G Wilma; Mei, Bastian; Muhler, Martin

    2012-11-01

    The deposition of hydrogen evolution sites on photocatalysts is a crucial step in the multistep process of synthesizing a catalyst that is active for overall photocatalytic water splitting. An alternative approach to conventional photodeposition was developed, applying the photocatalytic reforming of aqueous methanol solutions to deposit metal particles on semiconductor materials such as Ga₂O₃ and (Ga₀.₆ Zn₀.₄)(N₀.₆O₀.₄). The method allows optimizing the loading of the co-catalysts based on the stepwise addition of their precursors and the continuous online monitoring of the evolved hydrogen. Moreover, a synergetic effect between different co-catalysts can be directly established. Copyright © 2012 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  15. Watershed-based point sources permitting strategy and dynamic permit-trading analysis.

    Science.gov (United States)

    Ning, Shu-Kuang; Chang, Ni-Bin

    2007-09-01

    Permit-trading policy in a total maximum daily load (TMDL) program may provide an additional avenue to produce environmental benefit, which closely approximates what would be achieved through a command and control approach, with relatively lower costs. One of the important considerations that might affect the effective trading mechanism is to determine the dynamic transaction prices and trading ratios in response to seasonal changes of assimilative capacity in the river. Advanced studies associated with multi-temporal spatially varied trading ratios among point sources to manage water pollution hold considerable potential for industries and policy makers alike. This paper aims to present an integrated simulation and optimization analysis for generating spatially varied trading ratios and evaluating seasonal transaction prices accordingly. It is designed to configure a permit-trading structure basin-wide and provide decision makers with a wealth of cost-effective, technology-oriented, risk-informed, and community-based management strategies. The case study, seamlessly integrating a QUAL2E simulation model with an optimal waste load allocation (WLA) scheme in a designated TMDL study area, helps understand the complexity of varying environmental resources values over space and time. The pollutants of concern in this region, which are eligible for trading, mainly include both biochemical oxygen demand (BOD) and ammonia-nitrogen (NH3-N). The problem solution, as a consequence, suggests an array of waste load reduction targets in a well-defined WLA scheme and exhibits a dynamic permit-trading framework among different sub-watersheds in the study area. Research findings gained in this paper may extend to any transferable dynamic-discharge permit (TDDP) program worldwide.

  16. First report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    Energy Technology Data Exchange (ETDEWEB)

    Smith, J.G. [ed.; Adams, S.M.; Kszos, L.A.; Ryon, M.G.; Southworth, G.R.; Loar, J.M.

    1993-08-01

    A modified National Pollutant Discharge Elimination System permit was issued to the Oak Ridge Gaseous Diffusion Plant (now referred to as the Oak Ridge K-25 Site) on September 11, 1986. The Oak Ridge K-25 Site is a former uranium-enrichment production facility, which is currently managed by Martin Marietta Energy Systems, Inc. for the US Department of Energy. As required in Part III (L) of that permit, a plan for the biological monitoring of Mitchell Branch (K-1700 stream) was prepared and submitted for approval to the US Environmental Protection Agency and the Tennessee Department of Environment and Conservation [formerly the Tennessee Department of Health and Environment (Loar et al. 1992b)]. The K-25 Site Biological Monitoring and Abatement Program (BMAP) described biomonitoring activities that would be conducted over the duration of the permit. Because it was anticipated that the composition of existing effluent streams entering Mitchell Branch would be altered shortly after the modified permit was issued, sampling of the benthic invertebrate and fish communities (Task 4 of BMAP) was initiated in August and September 1986 respectively.

  17. First report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    International Nuclear Information System (INIS)

    Smith, J.G.; Adams, S.M.; Kszos, L.A.; Ryon, M.G.; Southworth, G.R.; Loar, J.M.

    1993-08-01

    A modified National Pollutant Discharge Elimination System permit was issued to the Oak Ridge Gaseous Diffusion Plant (now referred to as the Oak Ridge K-25 Site) on September 11, 1986. The Oak Ridge K-25 Site is a former uranium-enrichment production facility, which is currently managed by Martin Marietta Energy Systems, Inc. for the US Department of Energy. As required in Part III (L) of that permit, a plan for the biological monitoring of Mitchell Branch (K-1700 stream) was prepared and submitted for approval to the US Environmental Protection Agency and the Tennessee Department of Environment and Conservation [formerly the Tennessee Department of Health and Environment (Loar et al. 1992b)]. The K-25 Site Biological Monitoring and Abatement Program (BMAP) described biomonitoring activities that would be conducted over the duration of the permit. Because it was anticipated that the composition of existing effluent streams entering Mitchell Branch would be altered shortly after the modified permit was issued, sampling of the benthic invertebrate and fish communities (Task 4 of BMAP) was initiated in August and September 1986 respectively

  18. 78 FR 45918 - Application for Presidential Permit; Soule River Hydroelectric Project

    Science.gov (United States)

    2013-07-30

    ... accessing the program Web site at http://www.oe.energy.gov/permits_pending.htm , or by emailing Angela Troy at angela.troy@hq.doe.gov . Issued in Washington, DC, on July 24, 2013. Brian Mills, Director...

  19. Environmental and occupational hazards associated with decontamination solutions (a)

    International Nuclear Information System (INIS)

    Levanthal, L.

    1985-01-01

    Some of the reagents employed in the decontamination of reactor coolant systems are potentially hazardous. Potential exposure to decontamination agents by operating personnel, or members of the general population, could occur during use, processing, transportation to, or disposal at a low-level waste site. Federal and state agencies have promulgated regulations relevant to the disposal of decontamination solution waste to prevent acute or chronic exposures. In particular, the Nuclear Regulatory Commission (NRC), U.S. Environmental Protection Agency (EPA), Department of Transportation (DOT), Department of Labor - Occupational Safety and Health Administration (OSHA), State of South Carolina, State of Nevada, and the State of Washington have such regulations. These regulations may impact on the choice of decontamination solutions, operations procedures, processing methods, or disposal methods. Laws and regulations relate to both chemically hazardous, or toxic materials and to radioactive hazards. Laws which regulate the exposure of workers and the general public to effluents and emissions during processing, disposal and transport have been abstracted. As a result of these regulations, utilities are required to obtain permits to perform monitoring and sampling of personnel and the on-site and off-site environment, provide proper protective clothing and ventilation, make certain the solutions are properly contained during use, storage and processing, and destroy and/or properly immobilize the residues for disposal. Waste treatment processes such as neutralization, ion exchange, evaporation, incineration, etc., must not produce, nor result in hazardous emissions, effluents, residues, or hazards to workers. The laws also stipulate record keeping and documentation

  20. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site: Proposed Mixed Waste Disposal Unit (MWSU)

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2010-07-19

    The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When the proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.

  1. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site: Proposed Mixed Waste Disposal Unit (MWSU)

    International Nuclear Information System (INIS)

    2010-01-01

    The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When the proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.

  2. Meta-analysis of the effects of soil properties, site factors and experimental conditions on solute transport

    Directory of Open Access Journals (Sweden)

    J. K. Koestel

    2012-06-01

    Full Text Available Preferential flow is a widespread phenomenon that is known to strongly affect solute transport in soil, but our understanding and knowledge is still poor of the site factors and soil properties that promote it. To investigate these relationships, we assembled a database from the peer-reviewed literature containing information on 733 breakthrough curve experiments under steady-state flow conditions. Most of the collected experiments (585 of the 733 datasets had been conducted on undisturbed soil columns, although some experiments on repacked soil, clean sands, and glass beads were also included. In addition to the apparent dispersivity, we focused our attention on three indicators of preferential solute transport: namely the 5%-arrival time, the holdback factor, and the ratio of piston-flow and average transport velocities. Our results suggest that, in contrast to the 5%-arrival time and the holdback factor, the piston-flow to transport velocity ratio is not related to preferential macropore transport but rather to the exclusion or retardation of the applied tracer. Confirming that the apparent longitudinal dispersivity is positively correlated with the travel distance of the tracer, our results also illustrate that this relationship is refined if the normalized 5%-tracer arrival time is also taken into account. In particular, we found that the degree of preferential solute transport increases with apparent dispersivity and decreases with travel distance. A similar but weaker relationship was observed between apparent dispersivity, 5%-tracer arrival time, and lateral observation scale, such that the degree of preferential transport increases with lateral observation scale. However, we also found that the travel distance and the lateral observation scale in the investigated dataset are correlated, which makes it difficult to distinguish their influence on these transport characteristics. We also found that the strength of preferential transport

  3. WIPP's Hazardous Waste Facility Permit Renewal Application

    International Nuclear Information System (INIS)

    Most, W.A.; Kehrman, R.F.

    2009-01-01

    Hazardous waste permits issued by the New Mexico Environment Department (NMED) have a maximum term of 10-years from the permit's effective date. The permit condition in the Waste Isolation Pilot Plant's (WIPP) Hazardous Waste Facility Permit (HWFP) governing renewal applications, directs the Permittees to submit a permit application 180 days prior to expiration of the Permit. On October 27, 1999, the Secretary of the NMED issued to the United States Department of Energy (DOE), the owner and operator of WIPP, and to Washington TRU Solutions LLC (WTS), the Management and Operating Contractor and the cooperator of WIPP, a HWFP to manage, store, and dispose hazardous waste at WIPP. The DOE and WTS are collectively known as the Permittees. The HWFP is effective for a fixed term not to exceed ten years from the effective date of the Permit. The Permittees may renew the HWFP by submitting a new permit application at least 180 calendar days before the expiration date, of the HWFP. The Permittees are not proposing any substantial changes in the Renewal Application. First, the Permittees are seeking the authority to dispose of Contact-Handled and Remote-Handled TRU mixed waste in Panel 8. Panels 4 through 7 have been approved in the WIPP Hazardous Waste Facility Permit as it currently exists. No other change to the facility or to the manner in which hazardous waste is characterized, managed, stored, or disposed is being requested. Second, the Permittees also seek to include the Mine Ventilation Rate Monitoring Plan, as Attachment Q in the HWFP. This Plan has existed as a separate document since May 2000. The NMED has requested that the Plan be submitted as part of the Renewal Application. The Permittees have been operating to the Mine Ventilation Rate Monitoring Plan since the Plan was submitted. Third, some information submitted in the original WIPP RCRA Part B Application has been updated, such as demographic information. The Permittees will submit this information in the

  4. Hydrogeologic data for existing excavations and the Area 5 Radioactive Waste Management Site, Nevada Test Site, Nye County, Nevada

    International Nuclear Information System (INIS)

    1993-12-01

    The Special Projects Section of Reynolds Electrical ampersand Engineering Co., Inc. is responsible for characterizing the subsurface geology and hydrology of the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS) for the US Department of Energy, Nevada Operations Office (DOE/NV), Office of Environmental Restoration and Waste Management Waste Management Division. Geologic description, in situ testing, and laboratory analyses of alluvium exposed in existing excavations are important subparts to the Area 5 Site Characterization Program designed to determine the suitability of the RWMS for disposal of low level waste mixed waste and transuranic waste. The primary purpose of the Existing Excavation Project is two-fold: first, to characterize important hydrologic properties of the near surface alluvium, thought to play an important role in the infiltration and redistribution of water and solutes through the upper unsaturated zone at the Area 5 RWMS; and second, to provide guidance for the design of future sampling and testing programs. The justification for this work comes from the state of Nevada review of the original DOE/NV Part B Permit application submitted in 1988 for disposal of mixed wastes at the RWMS. The state of Nevada determined that the permit was deficient in characterization data concerning the hydrogeology of the unsaturated zone. DOE/NV agreed with the state and proposed the study of alluvium exposed in existing excavations as one step toward satisfying these important site characterization data requirements. Other components of the site characterization process include the Science Trench Borehole and Pilot Well Projects

  5. SiteChar – Methodology for a Fit-for-Purpose Assessment of CO2 Storage Sites in Europe

    Directory of Open Access Journals (Sweden)

    Delprat-Jannaud F.

    2015-04-01

    Full Text Available The FP7-funded SiteChar project examined the entire CO2 geological storage site characterisation process, from the initial feasibility studies through to the final stage of application for a CO2 storage permit based on criteria defined by the relevant European legislation. The SiteChar workflow for CO2 geological storage site characterisation provides a description of all elements of a site characterisation study, as well as guidance to streamline the site characterisation process and make sure that the output covers the aspects mentioned in the European Community (EC Storage Directive. Five potential European storage sites, representative of prospective geological contexts, were considered as test sites for the research work: a North Sea multi-store site (hydrocarbon field and aquifer offshore Scotland; an onshore aquifer in Denmark; an onshore gas field in Poland; an aquifer offshore in Norway; and an aquifer in the Southern Adriatic Sea. This portfolio combines complementary sites that allowed to encompass the different steps of the characterisation workflow. A key innovation was the development of internal ‘dry-run’ permit applications at the Danish and Scottish sites and their review by relevant regulatory authorities. This process helped to refine the site characterisation workflow, and aimed to identify remaining gaps in site-specific characterisation, needed to secure storage permits under the EC Storage Directive as implemented in ‘host’ Member States. SiteChar considered the important aspect of the public awareness and public opinions of these new technologies, in parallel to technical issues, on the onshore Polish and offshore Scottish sites. A new format to assist public opinion-forming processes was tested involving a small sample of local communities. Generic as well as site-specific information was made available to the general and local public via the internet and at information meetings. These exercises provide insight

  6. 7 CFR 330.203 - Action on applications for permits to move plant pests; form of and conditions in permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Action on applications for permits to move plant pests... PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.203 Action on applications for permits to move plant pests; form of and conditions in...

  7. A Survey on Smartphone-Based Crowdsensing Solutions

    OpenAIRE

    Zamora-Mero, Willian Jesus; Tavares De Araujo Cesariny Calafate, Carlos Miguel; Cano Escribá, Juan Carlos; Manzoni, Pietro

    2016-01-01

    © 2016 Willian Zamora et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. In recent years, the widespread adoption of mobile phones, combined with the ever-increasing number of sensors that smartphones are equipped with, greatly simplified the generalized adoption of crowdsensing solutions by reducing hardware requirements...

  8. Issues in third party attacks on SMCRA permits. [USA - Indiana

    Energy Technology Data Exchange (ETDEWEB)

    Kelley, G.D. Jr. (Ice Miller Donadio Ryan, Indianapolis, IN (USA))

    1990-01-01

    Legal issues which have occurred in third party attacks on SMCRA (Surface Mining Control and Reclamation Act) permit, mainly in Indiana, are discussed. Problems that can occur with the interrelationship of common law nuisance/injunction actions, the permit process, enforcement proceedings and collateral estoppel from administrative agency action, as well as finality issues in the permit process as related to other provisions of SMCRA. 37 refs.

  9. Tradeable carbon permits

    International Nuclear Information System (INIS)

    Koutstaal, P.R.

    1995-01-01

    The research project on tradeable carbon permits has focused on three elements. First of all, the practical implications of designing a system of tradeable emission permits for reducing CO2 has been studied. In the second part, the consequences of introducing a system of tradeable carbon permits for entry barriers have been considered. Finally, the institutional requirements and welfare effects of coordination of CO2 abatement in a second-best world have been examined

  10. Active Edge Sites Engineering in Nickel Cobalt Selenide Solid Solutions for Highly Efficient Hydrogen Evolution

    KAUST Repository

    Xia, Chuan

    2017-01-06

    An effective multifaceted strategy is demonstrated to increase active edge site concentration in NiCoSe solid solutions prepared by in situ selenization process of nickel cobalt precursor. The simultaneous control of surface, phase, and morphology result in as-prepared ternary solid solution with extremely high electrochemically active surface area (C = 197 mF cm), suggesting significant exposure of active sites in this ternary compound. Coupled with metallic-like electrical conductivity and lower free energy for atomic hydrogen adsorption in NiCoSe, identified by temperature-dependent conductivities and density functional theory calculations, the authors have achieved unprecedented fast hydrogen evolution kinetics, approaching that of Pt. Specifically, the NiCoSe solid solutions show a low overpotential of 65 mV at -10 mV cm, with onset potential of mere 18 mV, an impressive small Tafel slope of 35 mV dec, and a large exchange current density of 184 μA cm in acidic electrolyte. Further, it is shown that the as-prepared NiCoSe solid solution not only works very well in acidic electrolyte but also delivers exceptional hydrogen evolution reaction (HER) performance in alkaline media. The outstanding HER performance makes this solid solution a promising candidate for mass hydrogen production.

  11. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations

  12. Site Response Analysis Using DeepSoil: Case Study of Bangka Site, Indonesia

    Energy Technology Data Exchange (ETDEWEB)

    Iswanto, Eko Rudi; Yee, Eric [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-10-15

    Indonesia government declared through Act No. 17 year 2007 on the National Long-Term Development Plant Year 2005-2025 and Presidential Decree No. 5 year 2006 on the National Energy Policy (Indonesia 2007; Indonesia 2006), that nuclear energy is stated as a part of the national energy system. In order to undertake the above national policy, National Nuclear Energy Agency of Indonesia, as the promotor for the utilization of nuclear energy will conduct site study, which is a part of infrastructure preparation for NPP construction. Thorough preparation and steps are needed to operate an NPP and it takes between 10 to 15 years from the preliminary study (site selection, financial study, etc.) up to project implementation (manufacturing, construction, commissioning). During project implementation, it is necessary to prepare various documents relevant for permit application such as Safety Evaluation Report for site permit, Preliminary Safety Analysis Report and Environment Impact Assessment Report for construction permit. Considering the continuously increasing electricity energy demand, it is necessary to prepare for alternative NPP sites. The safety requirements of NPP's are stringent; amongst the various requirements is the ability to safely shut down in the wake of a possible earthquake. Ground response analysis of a potential site therefore needs to be carried out, parameter that affect the resistance of an NPP to earthquakes such as peak strain profiles is analysed. The objective of this paper is to analyse the ground response of the selected site for a NPP, using The Mw 7.9 in Sikuai Island, West Sumatra on September 12, 2007 as present input motion. This analysis will be carried out using a ground response analysis program, DeepSoil. In addition to this, an attempt was made to define the site specific input motion characteristics of the selected site for use in DeepSoil (DeepSoil 5.0). A site investigation at the WB site was performed primarily on the PS

  13. 23 CFR 750.105 - Signs that may be permitted in protected areas.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Signs that may be permitted in protected areas. 750.105... protected areas. (a) Erection or maintenance of the following signs may be permitted in protected areas... phenomena, historic sites, areas of natural scenic beauty or naturally suited for outdoor recreation and...

  14. The WIPP RCRA Part B permit application for TRU mixed waste disposal

    International Nuclear Information System (INIS)

    Johnson, J.E.

    1995-01-01

    In August 1993, the New Mexico Environment Department (NMED) issued a draft permit for the Waste Isolation Pilot Plant (WIPP) to begin experiments with transuranic (TRU) mixed waste. Subsequently, the Department of Energy (DOE) decided to cancel the on-site test program, opting instead for laboratory testing. The Secretary of the NMED withdrew the draft permit in 1994, ordering the State's Hazardous and Radioactive Waste Bureau to work with the DOE on submittal of a revised permit application. Revision 5 of the WIPP's Resource Conservation and Recovery Act (RCRA) Part B Permit Application was submitted to the NMED in May 1995, focusing on disposal of 175,600 m 3 of TRU mixed waste over a 25 year span plus ten years for closure. A key portion of the application, the Waste Analysis Plan, shifted from requirements to characterize a relatively small volume of TRU mixed waste for on-site experiments, to describing a complete program that would apply to all DOE TRU waste generating facilities and meet the appropriate RCRA regulations. Waste characterization will be conducted on a waste stream basis, fitting into three broad categories: (1) homogeneous solids, (2) soil/gravel, and (3) debris wastes. Techniques used include radiography, visually examining waste from opened containers, radioassay, headspace gas sampling, physical sampling and analysis of homogeneous wastes, and review of documented acceptable knowledge. Acceptable knowledge of the original organics and metals used, and the operations that generated these waste streams is sufficient in most cases to determine if the waste has toxicity characteristics, hazardous constituents, polychlorinated biphenyls (PBCs), or RCRA regulated metals

  15. THE IMPACT OF SHRINKING HANFORD BOUNDARIES ON PERMITS FOR TOXIC AIR POLLUTANT EMISSIONS FROM THE HANFORD 200 WEST AREA

    International Nuclear Information System (INIS)

    JOHNSON, R.E.

    2005-01-01

    This presentation (CE-580. Graduate Seminar) presents a brief description of an approach to use a simpler dispersion modeling method (SCREEN3) in conjunction with joint frequency tables for Hanford wind conditions to evaluate the impacts of shrinking the Hanford boundaries on the current permits for facilities in the 200 West Area. To fulfill requirements for the graduate student project (CE-702. Master's Special Problems), this evaluation will be completed and published over the next two years. Air toxic emissions play an important role in environmental quality and require a state approved permit. One example relates to containers or waste that are designated as Transuranic Waste (TRU), which are required to have venting devices due to hydrogen generation. The Washington State Department of Ecology (Ecology) determined that the filters used did not meet the definition of a ''pressure relief device'' and that a permit application would have to be submitted by the Central Waste Complex (CWC) for criteria pollutant and toxic air pollutant (TAP) emissions in accordance with Washington Administrative Code (WAC) 173-400 and 173-460. The permit application submitted in 2000 to Ecology used Industrial Source Code III (ISCIII) dispersion modeling to demonstrate that it was not possible for CWC to release a sufficient quantity of fugitive Toxic Air Pollutant emissions that could exceed the Acceptable Source Impact Levels (ASILs) at the Hanford Site Boundary. The modeled emission rates were based on the diurnal breathing in and out through the vented drums (approximately 20% of the drums), using published vapor pressure, molecular weight, and specific gravity data for all 600+ compounds, with a conservative estimate of one exchange volume per day (208 liters per drum). Two permit applications were submitted also to Ecology for the Waste Receiving and Processing Facility and the T Plant Complex. Both permit applications were based on the Central Waste Complex approach, and

  16. Solute-solute interactions in intermetallic compounds

    Energy Technology Data Exchange (ETDEWEB)

    Banerjee, Debashis; Murray, Ryan; Collins, Gary S., E-mail: collins@wsu.edu [Washington State University, Department of Physics and Astronomy (United States); Zacate, Matthew O. [Northern Kentucky University, Department of Physics and Geology (United States)

    2017-11-15

    Experiments were carried out on highly ordered GdAl{sub 2} samples containing extremely dilute mole fractions of{sup 111}In/Cd probe-atom solutes (about 10{sup −11}), intrinsic antisite atoms Al{sub Gd} having mole fractions of order 0-10{sup −2}, and doped with Ag solutes at mole fractions of order 10{sup −2}. Three types of defect interactions were investigated. (1) Quadrupole interactions caused by Ag-solute atoms neighboring{sup 111}In/Cd solute probe atoms were detected using the method of perturbed angular correlation of gamma rays (PAC). Three complexes of pairs of In-probes and Ag-solutes occupying neighboring positions on Gd- and Al-sublattices were identified by comparing site fractions in Gd-poor and Gd-rich GdAl{sub 2}(Ag) samples and from the symmetry of the quadrupole interactions. Interaction enthalpies between solute-atom pairs were determined from temperature dependences of observed site fractions. Repulsive interactions were observed for close-neighbor complexes In{sub Gd}+Ag{sub Gd} and In{sub Gd}+Ag{sub Al} pairs, whereas a slightly attractive interaction was observed for In{sub Al}+Ag{sub Al}. Interaction enthalpies were all small, in the range ±0.15 eV. (2) Quadrupole interactions caused by intrinsic antisite atoms Al{sub Gd} neighboring In{sub Gd} probes were also detected and site fractions measured as a function of temperature, as in previous work on samples not doped with Ag-solutes [Temperature- and composition-driven changes in site occupation of solutes in Gd{sub 1+3x}Al{sub 2−3x}, Zacate and Collins (Phys. Rev. B69, 174202 (1))]. However, the effective binding enthalpy between In{sub Gd} probe and Al{sub Gd} antisite was found to change sign from -0.12 eV (attractive interaction) in undoped samples to + 0.24 eV (repulsive) in Ag-doped samples. This may be attributed to an attractive interaction between Al{sub Gd} antisite atoms and Ag-dopants that competes with the attractive interaction between In{sub Gd} and Al{sub Gd

  17. Waste feed delivery environmental permits and approvals plan

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site's Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan

  18. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1992-01-01

    This report, Part B (Vol. 3) of the permit application for the WIPP facility, contains information related to the site characterization of the facility, including geology, design, rock salt evaluations, maps, drawings, and shaft excavations

  19. A decade of monitoring at Swiss Long-Term Forest Ecosystem Research (LWF) sites: can we observe trends in atmospheric acid deposition and in soil solution acidity?

    Science.gov (United States)

    Pannatier, Elisabeth Graf; Thimonier, Anne; Schmitt, Maria; Walthert, Lorenz; Waldner, Peter

    2011-03-01

    Trends in atmospheric acid deposition and in soil solution acidity from 1995 or later until 2007 were investigated at several forest sites throughout Switzerland to assess the effects of air pollution abatements on deposition and the response of the soil solution chemistry. Deposition of the major elements was estimated from throughfall and bulk deposition measurements at nine sites of the Swiss Long-Term Forest Ecosystem Research network (LWF) since 1995 or later. Soil solution was measured at seven plots at four soil depths since 1998 or later. Trends in the molar ratio of base cations to aluminum (BC/Al) in soil solutions and in concentrations and fluxes of inorganic N (NO(3)-N + NH(4)-N), sulfate (SO(4)-S), and base cations (BC) were used to detect changes in soil solution chemistry. Acid deposition significantly decreased at three out of the nine study sites due to a decrease in total N deposition. Total SO(4)-S deposition decreased at the nine sites, but due to the relatively low amount of SO(4)-S load compared to N deposition, it did not contribute to decrease acid deposition significantly. No trend in total BC deposition was detected. In the soil solution, no trend in concentrations and fluxes of BC, SO(4)-S, and inorganic N were found at most soil depths at five out of the seven sites. This suggests that the soil solution reacted very little to the changes in atmospheric deposition. A stronger reduction in base cations compared to aluminum was detected at two sites, which might indicate that acidification of the soil solution was proceeding faster at these sites.

  20. State waste discharge permit application for cooling water and condensate discharges

    Energy Technology Data Exchange (ETDEWEB)

    Haggard, R.D.

    1996-08-12

    The following presents the Categorical State Waste Discharge Permit (SWDP) Application for the Cooling Water and Condensate Discharges on the Hanford Site. This application is intended to cover existing cooling water and condensate discharges as well as similar future discharges meeting the criteria set forth in this document.

  1. On the multi-level solution algorithm for Markov chains

    Energy Technology Data Exchange (ETDEWEB)

    Horton, G. [Univ. of Erlangen, Nuernberg (Germany)

    1996-12-31

    We discuss the recently introduced multi-level algorithm for the steady-state solution of Markov chains. The method is based on the aggregation principle, which is well established in the literature. Recursive application of the aggregation yields a multi-level method which has been shown experimentally to give results significantly faster than the methods currently in use. The algorithm can be reformulated as an algebraic multigrid scheme of Galerkin-full approximation type. The uniqueness of the scheme stems from its solution-dependent prolongation operator which permits significant computational savings in the evaluation of certain terms. This paper describes the modeling of computer systems to derive information on performance, measured typically as job throughput or component utilization, and availability, defined as the proportion of time a system is able to perform a certain function in the presence of component failures and possibly also repairs.

  2. State waste discharge permit application 400 Area secondary cooling water. Revision 2

    International Nuclear Information System (INIS)

    1996-01-01

    This document constitutes the Washington Administrative Code 173-216 State Waste Discharge Permit Application that serves as interim compliance as required by Consent Order DE 91NM-177, for the 400 Area Secondary Cooling Water stream. As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site that affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 of the Washington Administrative Code, the State Waste Discharge Permitting Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order DE 91NM-177. The Consent Order DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. Based upon compositional and flow rate characteristics, liquid effluent streams on the Hanford Site have been categorized into Phase 1, Phase 2, and Miscellaneous streams. This document only addresses the 400 Area Secondary Cooling Water stream, which has been identified as a Phase 2 stream. The 400 Area Secondary Cooling Water stream includes contribution streams from the Fuels and Materials Examination Facility, the Maintenance and Storage Facility, the 481-A pump house, and the Fast Flux Test Facility

  3. Analytic hierarchy process-based approach for selecting a Pareto-optimal solution of a multi-objective, multi-site supply-chain planning problem

    Science.gov (United States)

    Ayadi, Omar; Felfel, Houssem; Masmoudi, Faouzi

    2017-07-01

    The current manufacturing environment has changed from traditional single-plant to multi-site supply chain where multiple plants are serving customer demands. In this article, a tactical multi-objective, multi-period, multi-product, multi-site supply-chain planning problem is proposed. A corresponding optimization model aiming to simultaneously minimize the total cost, maximize product quality and maximize the customer satisfaction demand level is developed. The proposed solution approach yields to a front of Pareto-optimal solutions that represents the trade-offs among the different objectives. Subsequently, the analytic hierarchy process method is applied to select the best Pareto-optimal solution according to the preferences of the decision maker. The robustness of the solutions and the proposed approach are discussed based on a sensitivity analysis and an application to a real case from the textile and apparel industry.

  4. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 appendices covering engineering drawings and operating procedures

  5. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constitutents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 Appendices covering engineering drawings and operating procedures

  6. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 14 Appendices. Topics include Engineering Drawings, Maps, Roads, Toxicity Testing, and Pilot-Scale Testing

  7. Application for Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site - U10c Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Programs

    2010-08-05

    The NTS is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. NNSA/NSO is the federal lands management authority for the NTS and NSTec is the Management & Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The U10C Disposal Site is located in the northwest corner of Area 9 at the NTS (Figure 1) and is located in a subsidence crater created by two underground nuclear events, one in October 1962 and another in April 1964. The disposal site opened in 1971 for the disposal of rubbish, refuse, pathological waste, asbestos-containing material, and industrial solid waste. A Notice of Intent form to operate the disposal site as a Class II site was submitted to the state of Nevada on January 26, 1994, and was acknowledged in a letter to the DOE on February 8, 1994. It operated as a state of Nevada Class II Solid Waste Disposal Site (SWDS) until it closed on October 5, 1995, for retrofit as a Class III SWDS. The retrofit consisted of the installation of a minimum four-foot compacted soil layer to segregate the different waste types and function as a liner to inhibit leachate and water flow into the lower waste zone. Five neutron monitoring tubes were installed in this layer to monitor possible leachate production and water activity. Upon acceptance of the installed barrier and approval of an Operating Plan by NDEP/BFF, the site reopened in January 1996 as a Class III SWDS for the disposal of industrial solid waste and other inert waste.

  8. 78 FR 25304 - Siemens Medical Solutions, USA, Inc., Oncology Care Systems (Radiation Oncology), Including On...

    Science.gov (United States)

    2013-04-30

    ..., USA, Inc., Oncology Care Systems (Radiation Oncology), Including On-Site Leased Workers From Source... Medical Solutions, USA, Inc., Oncology Care Systems (Radiation Oncology), including on- site leased... of February 2013, Siemens Medical Solutions, USA, Inc., Oncology Care Systems (Radiation Oncology...

  9. Early Site Permit Demonstration Program: Regulatory criteria evaluation report

    International Nuclear Information System (INIS)

    1993-03-01

    The primary objective of the Early Site Plan Demonstration Program (ESPDP) is to demonstrate successfully the use of 10CFR52 to obtain ESPs for one or more US sites for one (or more) ALWR nuclear power plants. It is anticipated that preparation of the ESP application and interaction with NRC during the application review process will result not only in an ESP for the applicant(s) but also in the development of criteria and definition of processes, setting the precedent that facilitates ESPs for subsequent ESP applications. Because siting regulatory processes and acceptance criteria are contained in over 100 separate documents, comprehensive licensing and technical reviews were performed to establish whether the requirements and documentation are self-consistent, whether the acceptance criteria are sufficiently well-defined and clear, and whether the licensing process leading to the issuance of an ESP is unambiguously specified. This document provides appendices A and B of this report. Appendix A contains a list of regulations, regulatory guidance, and acceptance criteria; Appendix B contains a cross-reference index of siting-related documentation

  10. A decision aid tool for equity issues analysis in emission permit allocations

    International Nuclear Information System (INIS)

    Vaillancourt, K.; Waaub, J.P.

    2004-01-01

    The general intention of global climate agreements is to stabilize greenhouse gases (GHG) concentrations in the atmosphere which contribute to climate change. Climate models indicate that the global average temperature will increase by about 1.4 to 5.8 degrees C by 2100 compared to the 1990 level. This study assumed the participation of all countries, including developing countries, to achieve a global GHG stabilization target. It examined international cooperation mechanisms such as permit trading to achieve global economic efficiency. The study proposed a decision aid tool that provides relevant information on various equitable permit allocation schemes. A dynamic multicriterion model was presented to share the global quantity of permits among 15 regions. Multiple definitions of equity were considered. A realistic simulation of the World-MARKAL energy model was conducted to demonstrate the potential application of the scheme in international negotiations. The goal was to propose a range of permit allocations for each country in order to restrict the number of possibilities and guide negotiations. A model of the global reduction scenario makes it possible to determine cost effective solutions and to calculate reduction costs. Equity issues related to permit allocations were also addressed along with permit allocations and net reduction costs for each region. 45 refs., 5 tabs., 2 figs., 1 appendix

  11. Ion binding by humic and fulvic acids: A computational procedure based on functional site heterogeneity and the physical chemistry of polyelectrolyte solutions

    International Nuclear Information System (INIS)

    Marinsky, J.A.; Reddy, M.M.; Ephraim, J.; Mathuthu, A.

    1988-04-01

    Ion binding equilibria for humic and fulvic acids are examined from the point of view of functional site heterogeneity and the physical chemistry of polyelectrolyte solutions. A detailed explanation of the potentiometric properties of synthetic polyelectrolytes and ion-exchange gels is presented first to provide the basis for a parallel consideration of the potentiometric properties exhibited by humic and fulvic acids. The treatment is then extended to account for functional site heterogeneity. Sample results are presented for analysis of the ion-binding reactions of a standard soil fulvic acid (Armadale Horizons Bh) with this approach to test its capability for anticipation of metal ion removal from solution. The ultimate refined model is shown to be adaptable, after appropriate consideration of the heterogeneity and polyelectrolyte factors, to programming already available for the consideration of ion binding by inorganics in natural waters. (orig.)

  12. Decommissioning of Malargue site: Engineering solution

    International Nuclear Information System (INIS)

    Liseno, Aldo; Giordano, Nolberto L.

    2000-01-01

    This paper provides a brief comment related with a projected repository to managed tailings of Malargue Plant, located in the city of Malargue (Mendoza province). The approved plan for restoration of Malargue consist of on site relocation of tailings to an engineered repository. The Site is located too close of Malargue city. To isolate tailings from the environment a multilayer system has been projected, in order to keep humidity of residues and multilayer, to avoid migration of contaminant to the environment. (author)

  13. Decisions on sites by Laender parliaments

    International Nuclear Information System (INIS)

    1977-01-01

    The Vereinigung Deutscher Elektrizitaetswerke (VDEW, Association of German Electricity Utilities) proposes two independent steps in the licensing procedure for each nuclear power plant constuction project: one first phase in which to establish site guarantees, and one licensing phase for construction and operation of the power plant. The first phase should henceforth proceed with the active participation of the public involved within the framework of a plans approval procedure. The novel aspect would be the binding clarification in this procedure not only of the nuclear aspects of the case, as formerly, but of all public aspects relating to the site. The construction and operating permits, which would constitute phase two, could then be handled in the usual procedure without any need for urgency. (orig.) [de

  14. Iron site occupancies in magnetite-ulvospinel solid solution: A new approach using XMCD

    Energy Technology Data Exchange (ETDEWEB)

    Pearce, C. I.; Henderson, C. M. B.; Telling, N. D.; Pattrick, R. A.D.; Vaughan, D. J.; Charnock, J. M.; Arenholz, E.; Tuna, F.; Coker, V.S.; Laan, G. van der

    2009-06-22

    Ordering of Fe{sup 3+} and Fe{sup 2+} between octahedral (Oh) and tetrahedral (Td) sites in synthetic members of the magnetite (Fe{sub 3}O{sub 4}) - ulvoespinel (Fe{sub 2}TiO{sub 4}) solid-solution series was determined using Fe L{sub 2,3}-edge X-ray magnetic circular dichroism (XMCD) coupled with electron microprobe and chemical analysis, Ti L-edge spectroscopy, Fe K-edge EXAFS and XANES, Fe{sub 57} Moessbauer spectroscopy, and unit cell parameters. Microprobe analysis, cell edges and chemical FeO determinations showed that the bulk compositions of the samples were stoichiometric magnetite-ulvoespinel solid-solutions. Surface sensitive XMCD showed that the surfaces of these oxide minerals were more sensitive to redox conditions and some samples required re-equilibration with suitable solid-solid buffers. Detailed site-occupancy analysis of these samples gave XMCD-Fe{sup 2+}/Fe{sup 3+} ratios very close to stoichiometric values. L{sub 2,3}-edge spectroscopy showed that Ti{sup 4+} was restricted to Oh sites. XMCD results showed that significant Fe{sup 2+} only entered Td when the Ti content was > 0.40 apfu while Fe{sup 2+} in Oh increased from 1 a.p.f.u in magnetite to a maximum of {approx}1.4 apfu in USP45. As the Ti content increased from this point, the steady increase in Fe{sup 2+} in Td sites was clearly observable in the XMCD spectra, concurrent with a slow decrease in Fe{sup 2+} in Oh sites. Calculated magnetic moments showed a steady decrease from magnetite (4.06 {mu}{sub B}) to USP45 (1.5 {mu}{sub B}) and then a slower decrease towards the value for ulvoespinel (0 {mu}{sub B}). Two of the synthesized samples were also partially maghemitized by re-equilibrating with an oxidizing Ni-NiO buffer and XMCD showed that Fe{sup 2+} oxidation only occurred at Oh sites, with concomitant vacancy formation restricted to this site. This study shows the advantage of using XMCD as a direct measurement of Fe oxidation state in these complex magnetic spinels. These results

  15. Application for Permit to Operate a Class II Solid Waste Disposal Site at the Nevada Test Site - U10c Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Programs

    2010-03-31

    The Nevada Test Site (NTS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NTS and National Security Technologies LLC (NSTec) is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The site will be used for the disposal of refuse, rubbish, garbage, sewage sludge, pathological waste, Asbestos-Containing Material (ACM), industrial solid waste, hydrocarbon-burdened soil, hydrocarbon-burdened demolition and construction waste, and other inert waste (hereafter called permissible waste). Waste containing free liquids or regulated under Subtitle C of the Resource Conservation and Recovery Act (RCRA) will not be accepted for disposal at the site. Waste regulated under the Toxic Substance Control Act (TSCA), excluding Polychlorinated Biphenyl [PCB], Bulk Product Waste (see Section 6.2.5) and ACM (see Section 6.2.2.2) will not be accepted for disposal at the site. The disposal site will be used as the sole depository of permissible waste which is: (1) Generated by entities covered under the U.S. Environmental Protection Agency (EPA) Hazardous Waste Generator Identification Number for the NTS; (2) Generated at sites identified in the Federal Facilities Agreement and Consent Order (FFACO); (3) Sensitive records and media, including documents, vugraphs, computer disks, typewriter ribbons, magnetic tapes, etc., generated by NNSA/NSO or its contractors; (4) ACM generated by NNSA/NSO or its contractors according to Section 6.2.2.2, as necessary; (5) Hydrocarbon-burdened soil and solid waste from areas covered under the EPA Hazardous Waste Generator Identification Number for the NTS; (6) Other waste on a case-by-case concurrence by

  16. State Waste Discharge Permit application: 200-W Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  17. State Waste Discharge Permit application: 200-E Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  18. Molecular studies of Cs adsorption sites in inorganic layered materials: the influence of solution concentration.

    Science.gov (United States)

    Sato, Kiminori; Hunger, Michael

    2017-07-19

    Radioactive Cs released into a soil environment migrates along with groundwater in a manner dependent on Cs concentration. Data on the variation of Cs adsorption as a function of solution concentration are an essential prerequisite to successful decontamination work in Fukushima. To aid the ongoing decontamination work, the adsorption of Cs in aqueous solution across a wide Cs + molarity range is studied for the case of saponite clay as adsorbent, an inorganic layered material that is an abundant mineral in the soil environment. The local molecular structures, i.e. nanosheet surfaces, nanosheet edges, and oncoming hexagonal cavities, participating in Cs adsorption are qualitatively highlighted by means of a recently developed analytical method using data from a conventional elution test, 133 Cs magic-angle-spinning nuclear magnetic resonance (MAS NMR), and the radiocesium interception potential (RIP) [K. Sato, et al., J. Phys. Chem. C, 2016, 120, 1270]. The concentrations of nanosheet edges amount to between 100 and 400 mmol kg -1 , which are not substantially different from those of the nanosheet surfaces, generally regarded as the main decontamination sites. This unambiguously implies that the nanosheet edges should be targeted as the molecular sites for decontaminating radioactive Cs, in addition to the nanosheet surfaces.

  19. PERMITTING LEADERSHIP IN THE UNITED STATES

    International Nuclear Information System (INIS)

    Ken Nemeth

    2002-01-01

    In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical

  20. Report on the Survey on Regulation of Site Selection and Preparation

    International Nuclear Information System (INIS)

    Webster, Philip

    2010-01-01

    At its first meeting in May 2008, the Working Group discussed a task to 'Prepare a report reviewing the various practices used by regulators in the regulation of nuclear power plant siting. The report should consider regulator practices on sites where a mixture of activities are taking place (e.g. operating units, new construction, decommissioning, etc) including organization of the regulators organisation, methods, systems, etc.'. Following discussion, the Working Group assigned an Action 1-5 to 'develop a survey on the regulation of nuclear sites including seismicity issues, security issues, multi-units aspects and regulator practices on sites where a mixture of activities are taking place (e.g. operating units, new construction, decommissioning, etc.)'. The Survey was prepared and issued by the NEA in July 2008 with a request to the member states to provide their responses by the next meeting of the Working Group in October 2008. In addition to addressing the specific topics actioned by the Working Group, the Survey also investigated the broader context of siting, in order to address the Mandate that had been approved by the CNRA. The questions in the survey therefore covered the topics of site evaluation, site selection, regulatory approval, site preparation and regulatory oversight. A topic of particular interest was to what extent IAEA guidance on site evaluation was followed. The survey considered the possibility that a body other than the safety regulator may approve the choice of site or permit the applicant to start to prepare it. The survey also investigated the existence of formal requirements and informal expectations, recognizing that these both form part of the regulatory tool-kit. Responses were received from all twelve member states that were then members of the Working Group. The responses were reviewed at the second meeting of the Working Group in October 2008. In general, it could be stated that new reactors are licensed in

  1. The Effect of Emission Permits and Pigouvian Taxes on Market Structure

    Energy Technology Data Exchange (ETDEWEB)

    Bunuel, M.

    2001-07-01

    Differently from Pigouvian taxes and direct regulation, tradable emission permits can decrease competition in a polluting industry under certain circumstances. Assume a potential entrant who can buy every permit. When permits are given free to current polluters, monopolization occurs if not every polluter foresees it. If foreseen, polluters want to free ride on the entrant's market power, but entry can still occur, although not with certainty. Considering a symmetric, mixed-strategy equilibrium with unconditional bids, the probability of entry decreases as the number of polluters increase. When permits are sold initially, monopolization occurs without more requirements than polluters being financially constrained. (Author)

  2. A new thermodynamic model for shaftwork targeting on total sites

    Energy Technology Data Exchange (ETDEWEB)

    Sorin, M.; Hammache, A. [CANMET Energy Technology Centre-Varennes, Quebec (Canada)

    2005-05-01

    The purpose of the paper is to introduce a targeting model based on a new thermodynamic insight on cogeneration in general and Rankine cycle in particular. The insight permits to express the ideal shaftwork of a cogeneration unit through the outlet heat load and the difference in Carnot factors between the heat source and heat sink for the given inlet temperature of the heat source. The deviation from the ideal shaftwork to the real one is assessed by using the traditionally turbine isentropic efficiency. Finally the new model allows targeting fuel consumption, cooling requirement and shaftwork production with high accuracy and visualizing then directly as special segments on the T-H diagram. A modified Site Utility Grand Composite Curve (SUGCC) diagram is proposed and compared to the original SUGCC. The shape of the right hand side of the diagram above site pinch is the same, however, below site pinch it is shifted to the left by an amount equal to shaftwork production below site pinch. Above site pinch VHP consumption is also corrected to account for shaftwork production above site pinch that is represented by segments rather than areas on the left hand side of the T-H diagram. (author)

  3. Assessing impacts on biological resources from Site Characterization Activities of the Yucca Mountain Project

    International Nuclear Information System (INIS)

    Green, R.A.; Cox, M.K.; Doerr, T.B.; O'Farrell, T.P.; Ostler, W.K.; Rautenstrauch, K.R.; Wills, C.A.

    1991-01-01

    An integrated impact assessment program was developed to monitor the possible effects of Site Characterization Activities (SCA) on the biological resources of the Yucca Mountain area. The program uses control and treatment sites incorporating both spatial and temporal controls. The selection of biotic variables for monitoring was based on their relative importance in the ecosystem and their ability to provide information on potential impacts. All measures of biotic and abiotic variables will be made on the same sample plots to permit linking changes in variables to each other

  4. Thorough removal of inorganic and organic mercury from aqueous solutions by adsorption on Lemna minor powder

    Energy Technology Data Exchange (ETDEWEB)

    Li Shunxing, E-mail: lishunxing@fjzs.edu.cn [Department of Chemistry, Zhangzhou Normal University, Zhangzhou 363000 (China); Fujian Province University Key Laboratory of Analytical Science, Zhangzhou Normal University, Zhangzhou (China); Zheng Fengying; Huang Yang [Department of Chemistry, Zhangzhou Normal University, Zhangzhou 363000 (China); Fujian Province University Key Laboratory of Analytical Science, Zhangzhou Normal University, Zhangzhou (China); Ni Jiancong [Department of Chemistry, Zhangzhou Normal University, Zhangzhou 363000 (China)

    2011-02-15

    The adsorption ability of duckweed (Lemna minor) powders for removing inorganic and organic mercury (methyl and ethyl mercury) has been studied using cold vapour atomic absorption spectrometry. The optimal adsorption conditions were: (a) the pH value of the solution 7.0 for inorganic and ethyl mercury, 9.0 for methyl mercury, and (b) equilibrium adsorption time 10, 20, and 40 min for inorganic mercury, methyl mercury, and ethyl mercury, respectively. After adsorption by L. minor powder for 40 min, when the initial concentrations of inorganic and organic mercury were under 12.0 {mu}g L{sup -1} and 50.0 {mu}g L{sup -1}, respectively, the residual concentrations of mercury could meet the criterion of drinking water (1.0 {mu}g L{sup -1}) and the permitted discharge limit of wastewater (10.0 {mu}g L{sup -1}) set by China and USEPA, respectively. Thorough removal of both inorganic and organic mercury from aqueous solutions was reported for the first time. The significant adsorption sites were C-O-P and phosphate groups by the surface electrostatic interactions with aqueous inorganic and organic mercury cations, and then the selective adsorption was resulted from the strong chelating interaction between amine groups and mercury on the surface of L. minor cells.

  5. Thorough removal of inorganic and organic mercury from aqueous solutions by adsorption on Lemna minor powder

    International Nuclear Information System (INIS)

    Li Shunxing; Zheng Fengying; Huang Yang; Ni Jiancong

    2011-01-01

    The adsorption ability of duckweed (Lemna minor) powders for removing inorganic and organic mercury (methyl and ethyl mercury) has been studied using cold vapour atomic absorption spectrometry. The optimal adsorption conditions were: (a) the pH value of the solution 7.0 for inorganic and ethyl mercury, 9.0 for methyl mercury, and (b) equilibrium adsorption time 10, 20, and 40 min for inorganic mercury, methyl mercury, and ethyl mercury, respectively. After adsorption by L. minor powder for 40 min, when the initial concentrations of inorganic and organic mercury were under 12.0 μg L -1 and 50.0 μg L -1 , respectively, the residual concentrations of mercury could meet the criterion of drinking water (1.0 μg L -1 ) and the permitted discharge limit of wastewater (10.0 μg L -1 ) set by China and USEPA, respectively. Thorough removal of both inorganic and organic mercury from aqueous solutions was reported for the first time. The significant adsorption sites were C-O-P and phosphate groups by the surface electrostatic interactions with aqueous inorganic and organic mercury cations, and then the selective adsorption was resulted from the strong chelating interaction between amine groups and mercury on the surface of L. minor cells.

  6. Example evaluation of a permit application for a proposed hazardous-waste landfill in eastern Adams County, Colorado

    Science.gov (United States)

    Banta, E.R.

    1986-01-01

    A project was undertaken by the U.S. Geological Survey in cooperation with the U. S. Environmental Protection Agency to demonstrate methods by which RCRA (Resources Conservation and Recovery Act of 1976) Part B permit applications might be evaluated. The purpose of the project was to prepare a report that would supplement a series of case studies to be made available to permit writers in the U.S. Environmental Protection Agency. Four sites in the United States were chosen for their potential applicability to geologically similar sites. The Adams County, Colorado, site was chosen to be representative of sites in the Upper Cretaceous Pierre Shale. The intent of this report is to provide an example of how available earth-science information might be used in evaluating an application and not to evaluate the acceptability of the site. Because this study is an evaluation of a permit application, the data used are limited to the data supplied in the application and in published reports. Of the five criteria required by the U.S. Environmental Protection Agency to be addressed in the permit application considered in the case study, the application was evaluated to be inadequate in addressing three criteria: (1) Site characterization, (2) ability to monitor the location, and (3) flow paths and 100-foot time of travel. Details of the inadequacies and a description of the information needed to eliminate the inadequacies are included in the report. (USGS)

  7. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  8. Empowerment Zones and Enterprise Districts, Enterprise Zone within Emporia city limits. These sites are allowed discounted building permit fees., Published in 2010, 1:1200 (1in=100ft) scale, City of Emporia / Lyon County Government.

    Data.gov (United States)

    NSGIC Local Govt | GIS Inventory — Empowerment Zones and Enterprise Districts dataset current as of 2010. Enterprise Zone within Emporia city limits. These sites are allowed discounted building permit...

  9. Hazardous waste incinerator permitting in Texas from inception to operation

    International Nuclear Information System (INIS)

    Simms, M.D.; McDonnell, R.G. III

    1991-01-01

    The regulatory permitting process for hazardous waste incinerators i a long and arduous proposition requiring a well-developed overall strategy. In Texas, RCRA permits for the operation of hazardous waste incinerator facilities are issued through the federally delegated Texas Water Commission (TWC). While the TWC has primacy in the issuance of RCRA permits for hazardous waste incinerators, the Texas Air Control Board (TACB) provides a significant portion of the Part B application review and provides much of the permit language. In addition to dealing with regulatory agencies, RCRA permitting provides by significant public involvement. Often the lack of public support becomes a major roadblock for an incinerator project. In order to establish an effective strategy which addresses the concerns of regulatory agencies and the public, it is important to have an understanding of the steps involved in obtaining a permit. A permit applicant seeking to construct a new hazardous waste incinerator can expect to go through a preapplication meeting with government regulators, a site selection process, file an application, respond to calls for additional technical information from both the TACB and the TWC, defend the application in a hearing, have a recommendation from a TWC hearing examiner and, finally, receive a determination from the TWC's Commissioners. Presuming a favorable response from the Commission, the permittee will be granted a trial burn permit and may proceed with the construction, certification and execution of a trial burn at the facility. Subsequent to publication of the trial burn results and approval by the TWC, the permittee will possess an operational hazardous waste incinerator permit. The paper describes the major steps required to receive an operational permit for a hazardous waste incinerator in the State of Texas. Important issues involved in each step will be discussed including insights gained from recent incinerator permitting efforts

  10. Development of Science-Based Permitting Guidance for Geological Sequestration of CO2 in Deep Saline Aquifers Based on Modeling and Risk Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jean-Philippe Nicot; Renaud Bouroullec; Hugo Castellanos; Susan Hovorka; Srivatsan Lakshminarasimhan; Jeffrey Paine

    2006-06-30

    Underground carbon storage may become one of the solutions to address global warming. However, to have an impact, carbon storage must be done at a much larger scale than current CO{sub 2} injection operations for enhanced oil recovery. It must also include injection into saline aquifers. An important characteristic of CO{sub 2} is its strong buoyancy--storage must be guaranteed to be sufficiently permanent to satisfy the very reason that CO{sub 2} is injected. This long-term aspect (hundreds to thousands of years) is not currently captured in legislation, even if the U.S. has a relatively well-developed regulatory framework to handle carbon storage, especially in the operational short term. This report proposes a hierarchical approach to permitting in which the State/Federal Government is responsible for developing regional assessments, ranking potential sites (''General Permit'') and lessening the applicant's burden if the general area of the chosen site has been ranked more favorably. The general permit would involve determining in the regional sense structural (closed structures), stratigraphic (heterogeneity), and petrophysical (flow parameters such as residual saturation) controls on the long-term fate of geologically sequestered CO{sub 2}. The state-sponsored regional studies and the subsequent local study performed by the applicant will address the long-term risk of the particular site. It is felt that a performance-based approach rather than a prescriptive approach is the most appropriate framework in which to address public concerns. However, operational issues for each well (equivalent to the current underground injection control-UIC-program) could follow regulations currently in place. Area ranking will include an understanding of trapping modes. Capillary (due to residual saturation) and structural (due to local geological configuration) trappings are two of the four mechanisms (the other two are solubility and mineral trappings

  11. Mixed waste disposal facility at the Nevada Test Site

    International Nuclear Information System (INIS)

    Dickman, P.T.; Kendall, E.W.

    1987-01-01

    In 1984, a law suit brought against DOE resulted in the requirement that DOE be subject to regulation by the state and US Environmental Protection Agency (EPA) for all hazardous wastes, including mixed wastes. Therefore, all DOE facilities generating, storing, treating, or disposing of mixed wastes will be regulated under the Resource Conservation and Recovery Act (RCTA). In FY 1985, DOE Headquarters requested DOE low-level waste (LLW) sites to apply for a RCRA Part B Permit to operate radioactive mixed waste facilities. An application for the Nevada Test Site (NTS) was prepared and submitted to the EPA, Region IX in November 1985 for review and approval. At that time, the state of Nevada had not yet received authorization for hazardous wastes nor had they applied for regulatory authority for mixed wastes. In October 1986, DOE Nevada Operations Office was informed by the Rocky Flats Plant that some past waste shipments to NTS contained trace quantities of hazardous substances. Under Colorado law, these wastes are defined as mixed. A DOE Headquarters task force was convened by the Under Secretary to investigate the situation. The task force concluded that DOE has a high priority need to develop a permitted mixed waste site and that DOE Nevada Operations Office should develop a fast track project to obtain this site and all necessary permits. The status and issues to be resolved on the permit for a mixed waste site are discussed

  12. BUILDING CONCEPTUAL AND MATHEMATICAL MODEL FOR WATER FLOW AND SOLUTE TRANSPORT IN THE UNSATURATED ZONE AT KOSNICA SITE

    Directory of Open Access Journals (Sweden)

    Stanko Ružičić

    2012-12-01

    Full Text Available Conceptual model of flow and solute transport in unsaturated zone at Kosnica site, which is the basis for modeling pollution migration through the unsaturated zone to groundwater, is set up. The main characteristics of the unsaturated zone of the Kosnica site are described. Detailed description of investigated profile of unsaturated zone, with all necessary analytical results performed and used in building of conceptual models, is presented. Experiments that are in progress and processes which are modeled are stated. Monitoring of parameters necessary for calibration of models is presented. The ultimate goal of research is risk assessment of groundwater contamination at Kosnica site that has its source in or on unsaturated zone.

  13. On a second order of accuracy stable difference scheme for the solution of a source identification problem for hyperbolic-parabolic equations

    Science.gov (United States)

    Ashyralyyeva, Maral; Ashyraliyev, Maksat

    2016-08-01

    In the present paper, a second order of accuracy difference scheme for the approximate solution of a source identification problem for hyperbolic-parabolic equations is constructed. Theorem on stability estimates for the solution of this difference scheme and their first and second order difference derivatives is presented. In applications, this abstract result permits us to obtain the stability estimates for the solutions of difference schemes for approximate solutions of two source identification problems for hyperbolic-parabolic equations.

  14. Setting the global thermostat with an exhaustible tradeable permit system

    International Nuclear Information System (INIS)

    Kosobud, R.G.; Quinn, K.G.; Illinois Univ., Chicago, IL; South, D.W.; Daly, T.A.

    1993-01-01

    The global warming policy debate has centered largely on near-term objectives such as freezing 1990 CO 2 emissions without regard to long-run implications. A policy of freezing CO 2 emissions is shown to slow but not halt global warming, while requiring expensive near-term adjustments. If the long-run temperature change outcome of the freeze policy is set as the goal of a more graduated control policy, one which allows the market to determine annual emissions, a more cost-effective solution is obtained that reduces the negative adjustment effects on the energy and other affected industries. The most cost-effective emissions time path of a graduated control policy could be achieved by an evaporative marketable CO 2 emissions permit system. This paper provides a preliminary examination of an evaporative permit system used to achieve long-run stabilization of greenhouse-induced temperature change

  15. Early Site Permit Demonstration Program: Regulatory criteria evaluation report

    International Nuclear Information System (INIS)

    1993-03-01

    The primary objective of the Early Site Plan Demonstration Program (ESPDP) is to demonstrate successfully the use of 10CFR52 to obtain ESPs for one or more US sites for one (or more) ALWR nuclear power plants. It is anticipated that preparation of the ESP application and interaction with NRC during the application review process will result not only in an ESP for the applicant(s) but also in the development of criteria and definition of processes, setting the precedent that facilitates ESPs for subsequent ESP applications. Because siting regulatory processes and acceptance criteria are contained in over 100 separate documents, comprehensive licensing and technical reviews were performed to establish whether the requirements and documentation are self-consistent, whether the acceptance criteria are sufficiently well-defined and clear, and whether the licensing process leading to the issuance of an ESP is unambiguously specified. This document provides appendices C and D of this report. Appendix C contains data from the licensing and technical reviews; Appendix D contains technology toolkit data sheets

  16. 77 FR 49483 - Actions on Special Permit Applications

    Science.gov (United States)

    2012-08-16

    ... modify the special permit Town, South Africa. 178.277(b)(1). to increase the water capacity from 17000... prevent leakage during transportation. (mode 1). 15667-N Volga Dnepr--UNIQUE AIR 49 CFR 172.101 Column To...). NEW SPECIAL PERMIT WITHDRAWN 15494-N Johnson Controls Battery 49 CFR 173.159 To authorize the Group...

  17. Early Site Permit Demonstration Program, plant parameters envelopes: Comparison with ranges of values for four hypothetical sites

    International Nuclear Information System (INIS)

    1992-09-01

    The purpose of this volume is to report the results of the comparison of the ALWR plan parameters envelope with values of site characteristics developed for our hypothetical sites that generally represent conditions encountered within the United States. This effort is not intended to identify or address the suitability of any existing site, site area, or region in the United States. Also included in this volume is Appendix F, SERCH Summaries Regarding Siting

  18. Gravity-driven pH adjustment for site-specific protein pKa measurement by solution-state NMR

    Science.gov (United States)

    Li, Wei

    2017-12-01

    To automate pH adjustment in site-specific protein pKa measurement by solution-state NMR, I present a funnel with two caps for the standard 5 mm NMR tube. The novelty of this simple-to-build and inexpensive apparatus is that it allows automatic gravity-driven pH adjustment within the magnet, and consequently results in a fully automated NMR-monitored pH titration without any hardware modification on the NMR spectrometer.

  19. Bavarian Constitutional Court, decision of August 14, 1987 (Referendum on sites of nuclear installations)

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    In the dissenting opinion of one of the judges of the Bavarian Constitutional Court concerning the decision of August 14, 1987, the Land Bavaria has a competence according to the constitution to decide about sites of nuclear installations. Hence it follows that a referendum on this problem has to be permitted. (CW) [de

  20. Early Site Permit Demonstration Program: Regulatory criteria evaluation report

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    The primary objective of the ESPDP is to demonstrate successfully the use of 10CFR52 to obtain ESPs for one or more US sites for one (or more) ALWR nuclear power plants. It is anticipated that preparation of the ESP application and interaction with NRC during the application review process will result not only in an ESP for the applicant(s) but also in the development of criteria and definition of processes, setting the precedent that facilitates ESPs for subsequent ESP applications. Because siting regulatory processes and acceptance criteria are contained in over 100 separate documents, comprehensive licensing and technical reviews were performed to establish whether the requirements and documentation are self-consistent, whether the acceptance criteria are sufficiently well-defined and clear, and whether the licensing process leading to the issuance of an ESP is unambiguously specified. The results of the technical and licensing evaluations are presented in this report. The purpose, background, and organization of the ESPDP is delineated in Section 1. Section 11 contains flowcharts defining siting application requirements, environmental report requirements, and emergency planning/preparedness requirements for ALWRS. The licensing and technical review results are presented in Section III.

  1. Early Site Permit Demonstration Program: Regulatory criteria evaluation report

    International Nuclear Information System (INIS)

    1993-03-01

    The primary objective of the ESPDP is to demonstrate successfully the use of 10CFR52 to obtain ESPs for one or more US sites for one (or more) ALWR nuclear power plants. It is anticipated that preparation of the ESP application and interaction with NRC during the application review process will result not only in an ESP for the applicant(s) but also in the development of criteria and definition of processes, setting the precedent that facilitates ESPs for subsequent ESP applications. Because siting regulatory processes and acceptance criteria are contained in over 100 separate documents, comprehensive licensing and technical reviews were performed to establish whether the requirements and documentation are self-consistent, whether the acceptance criteria are sufficiently well-defined and clear, and whether the licensing process leading to the issuance of an ESP is unambiguously specified. The results of the technical and licensing evaluations are presented in this report. The purpose, background, and organization of the ESPDP is delineated in Section 1. Section 11 contains flowcharts defining siting application requirements, environmental report requirements, and emergency planning/preparedness requirements for ALWRS. The licensing and technical review results are presented in Section III

  2. Run permit software for the proton storage ring

    International Nuclear Information System (INIS)

    Bair, S.S.

    1985-01-01

    The Run Permit system is intended to protect equipment from radiation effects caused by having beam enabled when required equipment is not operational. This system will not allow beam unless certain devices are ready and will drop beam if any of these devices become inoperative. A system to provide such protection might be implemented in hardware. However, because the several operating modes of the Proton Storage Ring/Weapons Neutron Research facility require certain devices to be in different states (depending on mode), a dynamic configuration capability is needed, that is, a software solution is more feasible

  3. An Initial Evaluation of Siting Considerations on Current and Future Wind Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Tegen, Suzanne [National Renewable Energy Lab. (NREL), Golden, CO (United States); Lantz, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Heimiller, Donna [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hand, Maureen [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ibanez, Eduardo [GE Energy Consulting, Denver, CO (United States)

    2016-07-01

    This report provides a deeper understanding of the wind project development process, from desktop studies to a successful project in the ground. It examines three siting consideration categories that wind project sponsors must include in the development process: wildlife (species that live in, near, or migrate through the area where wind development is possible), radar (wind turbines can cause interference with radar signals), and public engagement (representing communities and stakeholders who live near wind power projects). The research shows that although this country's abundant wind resource provides numerous options for addressing siting considerations, actually siting individual projects is becoming more difficult because of regulatory and other uncertainties. Model results are based on the premise that developers will be able to site, permit, and build successful projects, which is not always the case in reality.

  4. 76 FR 28776 - Re-Proposal of Effluent Limits Under the NPDES General Permit for Oil and Gas Exploration...

    Science.gov (United States)

    2011-05-18

    ... assurance may be obtained or viewed at the following locations. (1) EPA Region 10 Library, Park Place.... (3) EPA Web site http://yosemite.epa.gov/r10/water.nsf/NPDES+Permits/Permits+Homepage . (4) ADEC...

  5. Crystal chemical analysis of formation of solid solutions on the basis of compounds with garnet structure

    International Nuclear Information System (INIS)

    Kuz'micheva, G.M.; Kozlikin, S.N.

    1989-01-01

    Crystal chemical formulas permitting to evaluate the character of changes in interatomic distances during isomorphous substitution and, hence, the probability of formation of internal solid solutions and successive isomorphous substitution, are presented. The possibility of formation of introduction solid solutions is considered, using as an example Sc, Y oxides, rare earths with garnet structure

  6. Mass discharge estimation from contaminated sites: Multi-model solutions for assessment of conceptual uncertainty

    Science.gov (United States)

    Thomsen, N. I.; Troldborg, M.; McKnight, U. S.; Binning, P. J.; Bjerg, P. L.

    2012-04-01

    Mass discharge estimates are increasingly being used in the management of contaminated sites. Such estimates have proven useful for supporting decisions related to the prioritization of contaminated sites in a groundwater catchment. Potential management options can be categorised as follows: (1) leave as is, (2) clean up, or (3) further investigation needed. However, mass discharge estimates are often very uncertain, which may hamper the management decisions. If option 1 is incorrectly chosen soil and water quality will decrease, threatening or destroying drinking water resources. The risk of choosing option 2 is to spend money on remediating a site that does not pose a problem. Choosing option 3 will often be safest, but may not be the optimal economic solution. Quantification of the uncertainty in mass discharge estimates can therefore greatly improve the foundation for selecting the appropriate management option. The uncertainty of mass discharge estimates depends greatly on the extent of the site characterization. A good approach for uncertainty estimation will be flexible with respect to the investigation level, and account for both parameter and conceptual model uncertainty. We propose a method for quantifying the uncertainty of dynamic mass discharge estimates from contaminant point sources on the local scale. The method considers both parameter and conceptual uncertainty through a multi-model approach. The multi-model approach evaluates multiple conceptual models for the same site. The different conceptual models consider different source characterizations and hydrogeological descriptions. The idea is to include a set of essentially different conceptual models where each model is believed to be realistic representation of the given site, based on the current level of information. Parameter uncertainty is quantified using Monte Carlo simulations. For each conceptual model we calculate a transient mass discharge estimate with uncertainty bounds resulting from

  7. State waste discharge permit application, 200-E chemical drain field

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  8. State waste discharge permit application, 200-E chemical drain field

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field

  9. The role of abatement costs in GHG permit allocations : a global reduction scenario with the World-MARKAL model

    International Nuclear Information System (INIS)

    Vaillancourt, K.; Kanudia, A.

    2004-01-01

    The World-MARKAL model was used to examine a permit trading system to stabilize greenhouse gas emissions. The model considered the participation of all countries, including developing countries. Allocation schemes aimed at fair distribution of net abatement costs among world regions were proposed. The net abatement costs for each region are good indicators of where more abatement measures are needed. Equity issues relative to permit allocations and burden sharing were also presented along with the allocation methodology. The gross abatement costs before permit trading were calculated for each region. The main advantages and disadvantages of this approach were listed. It was concluded that permit allocation schemes based on cost distribution make it possible to obtain solutions with equalized net costs per gross domestic product for all regions. 30 refs., 6 tabs., 3 figs

  10. Savannah River Site Tank Cleaning: Corrosion Rate For One Versus Eight Percent Oxalic Acid Solution

    International Nuclear Information System (INIS)

    Ketusky, E.; Subramanian, K.

    2011-01-01

    Until recently, the use of oxalic acid for chemically cleaning the Savannah River Site (SRS) radioactive waste tanks focused on using concentrated 4 and 8-wt% solutions. Recent testing and research on applicable dissolution mechanisms have concluded that under appropriate conditions, dilute solutions of oxalic acid (i.e., 1-wt%) may be more effective. Based on the need to maximize cleaning effectiveness, coupled with the need to minimize downstream impacts, SRS is now developing plans for using a 1-wt% oxalic acid solution. A technology gap associated with using a 1-wt% oxalic acid solution was a dearth of suitable corrosion data. Assuming oxalic acid's passivation of carbon steel was proportional to the free oxalate concentration, the general corrosion rate (CR) from a 1-wt% solution may not be bound by those from 8-wt%. Therefore, after developing the test strategy and plan, the corrosion testing was performed. Starting with the envisioned process specific baseline solvent, a 1-wt% oxalic acid solution, with sludge (limited to Purex type sludge-simulant for this initial effort) at 75 C and agitated, the corrosion rate (CR) was determined from the measured weight loss of the exposed coupon. Environmental variations tested were: (a) Inclusion of sludge in the test vessel or assuming a pure oxalic acid solution; (b) acid solution temperature maintained at 75 or 45 C; and (c) agitation of the acid solution or stagnant. Application of select electrochemical testing (EC) explored the impact of each variation on the passivation mechanisms and confirmed the CR. The 1-wt% results were then compared to those from the 8-wt%. The immersion coupons showed that the maximum time averaged CR for a 1-wt% solution with sludge was less than 25-mils/yr for all conditions. For an agitated 8-wt% solution with sludge, the maximum time averaged CR was about 30-mils/yr at 50 C, and 86-mils/yr at 75 C. Both the 1-wt% and the 8-wt% testing demonstrated that if the sludge was removed from

  11. Supplemental Environmental Baseline Survey for Proposed Land Use Permit Modification for Expansion of the Dynamic Explosive Test Site (DETS) 9940 Main Complex Parking Lot

    Energy Technology Data Exchange (ETDEWEB)

    Peek, Dennis W. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-10-01

    The “subject property” is comprised of a parcel of land within the Kirtland Military Reservation, Bernalillo County, New Mexico, as shown on the map in Appendix B of this document. The land requirement for the parking lot addition to the 9940 Main Complex is approximately 2.7 acres. The scope of this Supplemental Environmental Baseline Survey (SEBS) is for the parking lot addition land transfer only. For details on the original 9940 Main Complex see Environmental Baseline Survey, Land Use Permit Request for the 9940 Complex PERM/0-KI-00-0001, August 21, 2003, and for details on the 9940 Complex Expansion see Environmental Baseline Survey, Proposed Land Use Permit Expansion for 9940 DETS Complex, June 24, 2009. The 2.7-acre parcel of land for the new parking lot, which is the subject of this EBS (also referred to as the “subject property”), is adjacent to the southwest boundary of the original 12.3- acre 9940 Main Complex. No testing is known to have taken place on the subject property site. The only activity known to have taken place was the burial of overhead utility lines in 2014. Adjacent to the subject property, the 9940 Main Complex was originally a 12.3-acre site used by the Department of Energy (DOE) under a land use permit from the United States Air Force (USAF). Historical use of the site, dating from 1964, included arming, fusing, and firing of explosives and testing of explosives systems components. In the late 1970s and early 1980s experiments at the 9940 Main Complex shifted toward reactor safety issues. From 1983 to 1988, fuel coolant interaction (FCI) experiments were conducted, as were experiments with conventional high explosives (HE). Today, the land is used for training of the Nuclear Emergency Response community and for research on energetic materials. In 2009, the original complex was expanded to include four additional 20-acre areas: 9940 Training South, 9940 Training East, T-Range 6, and Training West Landing Zone. The proposed use of

  12. Permit trading and credit trading

    DEFF Research Database (Denmark)

    Boom, Jan-Tjeerd; R. Dijstra, Bouwe

    This paper compares emissions trading based on a cap on total emissions (permit trading) and on relative standards per unit of output (credit trading). Two types of market structure are considered: perfect competition and Cournot oligopoly. We find that output, abatement costs and the number...... of firms are higher under credit trading. Allowing trade between permit-trading and credit-trading sectors may increase in welfare. With perfect competition, permit trading always leads to higher welfare than credit trading. With imperfect competition, credit trading may outperform permit trading....... Environmental policy can lead to exit, but also to entry of firms. Entry and exit have a profound impact on the performance of the schemes, especially under imperfect competition. We find that it may be impossible to implement certain levels of total industry emissions. Under credit trading several levels...

  13. HANFORD SITE AIR OPERATING PERMIT SEMIANNUAL REPORT FOR THE PERIOD 07/01/2004 THRU 12/31/2004

    International Nuclear Information System (INIS)

    GREEN, W.E.

    2005-01-01

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. One condition contained in the AOP, ''Standard Terms and Conditions'', Section 4.3.3, is the requirement to submit semiannual reports by March 15th and September 15th each year, which are certified for truth, accuracy, and completeness by a Responsible Official. This semiannual report contains information from July 1, 2004 through December 31, 2004. Copies of semiannual reports are transmitted to the Washington State Department of Ecology (Ecology). the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the US Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, AOP, ''Standard Terms and Conditions'', Section 4.3.3, as amended in August 2002 and December 2002, identifies the following. (1) Each semiannual report will provide a reference to deviation reports submitted to the regulatory agencies as required by Section 4.5. ''Permit Deviation Reporting''. (2) Each semiannual report will consist of reports of any required monitoring not submitted previously to the agencies or a reference to reports of required monitoring submitted during the reporting period. (3) Each semiannual report will contain a summary of any substantiated air emission complaint investigation(s) required in Table 1.2 of AOP, Attachment 1, and issued during the reporting period. (4) For all minor radioactive emission points (potential to emit <0.1 mrem to the maximally exposed individual) listed in AOP, Attachment 2. Tables 1.2. 1.3, and 2.1, each semiannual report will confirm that any required monitoring was conducted to verify low emissions during the reporting period. Data derived from that monitoring will be reported in the Annual National Emission Standards for Hazardous Air Pollutants (NESHAP) Report (AOP, ''Standard Terms and Conditions'', Section 4.3.1). AOP requirement is for annual monitoring (e.g., four 1 week samples

  14. Annual Site Environmental Report, 2007(ASER)

    International Nuclear Information System (INIS)

    Sabba, D

    2008-01-01

    Management Program (EMP) was completed and progress reports were routinely provided to SLAC senior management. During 2007, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during 2007. SLAC replaced two process tanks at the Plating Shop which previously contained chromium solutions with non-chromium containing solutions, reducing the overall use of hazardous chemicals. In addition, 346 polychlorinated biphenyl (PCB)-contaminated capacitors were replaced with non-PCB capacitors, reducing the potential of a release of oil with PCBs during an event such as a fire or an earthquake. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2007, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2007, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. Specifically, the Radiation Protection Radiological Waste Management (RPRWM) Group developed a training course to certify Radioactive Waste Generators, conducted a training pilot, and developed a list of potential radioactive waste generators to train. In 2007, the SLAC Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup

  15. Annual Site Environmental Report, 2007(ASER)

    Energy Technology Data Exchange (ETDEWEB)

    Sabba, D

    2008-10-07

    plan, or Environmental Management Program (EMP) was completed and progress reports were routinely provided to SLAC senior management. During 2007, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during 2007. SLAC replaced two process tanks at the Plating Shop which previously contained chromium solutions with non-chromium containing solutions, reducing the overall use of hazardous chemicals. In addition, 346 polychlorinated biphenyl (PCB)-contaminated capacitors were replaced with non-PCB capacitors, reducing the potential of a release of oil with PCBs during an event such as a fire or an earthquake. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2007, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2007, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. Specifically, the Radiation Protection Radiological Waste Management (RPRWM) Group developed a training course to certify Radioactive Waste Generators, conducted a training pilot, and developed a list of potential radioactive waste generators to train. In 2007, the SLAC Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is

  16. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Protection and Technical Services

    2009-09-30

    This permit application provides facility information on the design, processes, and security features associated with the proposed Mixed Waste Disposal Unit. The unit will receive and dispose of onsite and offsite containerized low-level mixed waste (LLMW) that has an approved U.S. Department of Energy nexus.

  17. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site

    International Nuclear Information System (INIS)

    2009-01-01

    This permit application provides facility information on the design, processes, and security features associated with the proposed Mixed Waste Disposal Unit. The unit will receive and dispose of onsite and offsite containerized low-level mixed waste (LLMW) that has an approved U.S. Department of Energy nexus.

  18. Intertemporal Permit Trading for the Control of Greenhouse Gas Emissions

    International Nuclear Information System (INIS)

    Leiby, P.; Rubin, J.

    2001-01-01

    This paper integrates two themes in the intertemporal permit literature through the construction of an intertemporal banking system for a pollutant that creates both stock and flow damages. A permit banking system for the special case of a pollutant that only causes stock damages is also developed. This latter, simpler case corresponds roughly to the greenhouse gas emission reduction regime proposed by the U.S. Department of State as a means of fulfilling the U.S. commitment to the Framework Convention on Climate Change. This paper shows that environmental regulators can achieve the socially optimal level of emissions and output through time by setting the correct total sum of allowable emissions, and specifying the correct intertemporal trading ratio for banking and borrowing. For the case of greenhouse gases, we show that the optimal growth rate of permit prices, and therefore the optimal intertemporal trading rate, has the closed-form solution equal to the ratio of current marginal stock damages to the discounted future value of marginal stock damages less the decay rate of emissions in the atmosphere. Given a non-optimal negotiated emission path we then derive a permit banking system that has the potential to lower net social costs by adjusting the intertemporal trading ratio taking into account the behavior of private agents. We use a simple numerical simulation model to illustrate the potential gains from various possible banking systems. 24 refs

  19. 200 West Ash Pit Demolition Site closure plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Hanford Facility is owned by the US Government and operated by the US Department of Energy, Richland Field Office. Dangerous waste and mixed waste (containing both radioactive and dangerous components) are managed and produced on the Hanford Facility. Westinghouse Hanford Company is a major contractor to the US Department of Energy, Richland Field Office and serves as cooperator of the 200 West Ash Pit Demolition Site, the unit addressed in this closure plan. The 200 West Ash Pit Demolition Site Closure Plan consists of a Part A Permit Application (Revision 3) and a closure plan. An explanation of the Part A Permit Application revision is provided at the beginning of the Part A section. The closure plan consists of nine chapters and three appendices. This 200 West Ash Pit Demolition Site Closure Plan submittal contains information current as of October 15, 1992

  20. 77 FR 9298 - Office of Hazardous Materials Safety; Actions on Special Permit Applications

    Science.gov (United States)

    2012-02-16

    ... Lake 173.302(f). special permit Charles, LA. issued on an emergency basis to a permanent special permit... and Space authorize the Administration transportation in (NASA) commerce of certain Washington, DC... Aeronautics & transportation in Space commerce of certain Administration hydrazine fuels on (NASA) the same...

  1. Preparing undergraduates for the future of scientific collaboration: Benefits, challenges and technological solutions in Distributed REU Sites

    Science.gov (United States)

    Hubenthal, M.; Anagnos, T.

    2012-12-01

    exposes all interns to a larger spectrum of research topics and approaches within a field than would be available within a single research site. Evaluations also reveal that fostering social and academic interactions among interns working on generally unrelated projects at separate locations is challenging and requires a consistent, focused effort by the program. In part this is because creating a cohort experience in this situation requires a layer of interaction beyond the networks naturally establish by the interns when co-located. A critical first step is to establish a social presence among the group. This occurs through early face-to-face meetings and then is carried forward as interns transition to virtual interactions. These virtual interactions occur through a variety of technological solutions. Both commercially and freely available technologies such as blogging software, Facebook, an online course management system, virtual worlds, and a variety of online conferencing applications are used to connect the students both synchronously and asynchronously. We have documented the strengths and weaknesses of these individual solutions and show how combinations, combined with programmatic interventions, can offer a suite of functionality necessary to facilitate both social and academic interactions and influence career paths.

  2. Second report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    Energy Technology Data Exchange (ETDEWEB)

    Smith, J.G. [ed.; Adams, S.M.; Hinzman, R.L.; Kszos, L.A.; Loar, J.M.; Peterson, M.J.; Ryon, M.G.; Southworth, G.R. [Oak Ridge National Lab., TN (United States); Crumby, W.D. [Automated Sciences Group, Inc., Oak Ridge, TN (United States)

    1994-03-01

    On September 11, 1986, a modified National Pollutant Discharge Elimination System permit was issued for the Oak Ridge Gaseous Diffusion Plant (ORGDP; now referred to as the Oak Ridge K-25 Site), a former uranium-enrichment production facility. As required in Part III of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed for the biological monitoring of Mitchell Branch (K-1700 stream) and submitted for approval to the US EPA and the Tennessee Department of Environment and Conservation. The plan described biomonitoring activities that would be conducted over the duration of the permit. The objectives of the BMAP are to demonstrate that the effluent limitations established for the Oak Ridge K-25 Site protect and maintain the use of Mitchell Branch for growth and propagation of fish and other aquatic life, and to document the effects on stream biota resulting from operation of major new pollution abatement facilities. The BMAP consists of four tasks: ambient toxicity testing; bioaccumulation studies; biological indicator studies; and ecological surveys of stream communities, including benthic macroinvertebrates and fish. This document is the second in a series of reports presenting the results of the studies that were conducted over various periods of time between August 1987 and June 1990.

  3. 76 FR 22891 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Science.gov (United States)

    2011-04-25

    ... statements and data pertaining to the proposed permit at the public hearing. E. Finalizing This Action This... in the December 2009 final rule regarding the calculation of the numeric limitation on turbidity... construction sites to a numeric effluent limitation of 280 NTU for the pollutant turbidity starting in August...

  4. Early Site Permit Demonstration Program: Guidelines for determining design basis ground motions

    International Nuclear Information System (INIS)

    1993-01-01

    This report develops and applies a methodology for estimating strong earthquake ground motion. The motivation was to develop a much needed tool for use in developing the seismic requirements for structural designs. An earthquake's ground motion is a function of the earthquake's magnitude, and the physical properties of the earth through which the seismic waves travel from the earthquake fault to the site of interest. The emphasis of this study is on ground motion estimation in Eastern North America (east of the Rocky Mountains), with particular emphasis on the Eastern United States and southeastern Canada. Eastern North America is a stable continental region, having sparse earthquake activity with rare occurrences of large earthquakes. While large earthquakes are of interest for assessing seismic hazard, little data exists from the region to empirically quantify their effects. The focus of the report is on the attributes of ground motion in Eastern North America that are of interest for the design of facilities such as nuclear power plants. This document, Volume II, contains Appendices 2, 3, 5, 6, and 7 covering the following topics: Eastern North American Empirical Ground Motion Data; Examination of Variance of Seismographic Network Data; Soil Amplification and Vertical-to-Horizontal Ratios from Analysis of Strong Motion Data From Active Tectonic Regions; Revision and Calibration of Ou and Herrmann Method; Generalized Ray Procedure for Modeling Ground Motion Attenuation; Crustal Models for Velocity Regionalization; Depth Distribution Models; Development of Generic Site Effects Model; Validation and Comparison of One-Dimensional Site Response Methodologies; Plots of Amplification Factors; Assessment of Coupling Between Vertical ampersand Horizontal Motions in Nonlinear Site Response Analysis; and Modeling of Dynamic Soil Properties

  5. Hanford Site Storm Water Comprehensive Site Compliance Evaluation Report - July 1, 1997 Through June 30, 1998

    International Nuclear Information System (INIS)

    Landon, R.J.

    1999-01-01

    On September 9, 1992, the U.S. Environmental Protection Agency (EPA) issued General Permit No. WA-R-00-000F, ''Authorization to Discharge Under the National Pollutant Discharge Elimination System (NPDES) for Storm Water Discharges Associated with Industrial Activity'' (EPA 1992) to the U.S. Department of Energy, Richland Operations Office (RL). As required by General Permit, Section IV, Part D, Section 4.c (EPA 1992), an annual report must be developed by RL and retained onsite to verify that the requirements listed in the General Permit are implemented. This document fulfills the requirement to prepare an annual report. This report also describes the methods used to conduct the Storm Water Comprehensive Site Compliance Evaluation (SWCSCE) as required in the General Permit, Part IV, Section D.4.c (EPA 1992); identifies the pollution prevention team (PPT) (Appendix A); summarizes the results of the compliance evaluation (Appendix B); and documents significant leaks and spills (Appendix C)

  6. Selective on site separation and detection of molecules in diluted solutions with super-hydrophobic clusters of plasmonic nanoparticles

    KAUST Repository

    Gentile, Francesco T.; Coluccio, Maria Laura; Proietti Zaccaria, Remo; Francardi, Marco; Cojoc, Gheorghe; Perozziello, Gerardo; Raimondo, Raffaella; Candeloro, Patrizio; Di Fabrizio, Enzo M.

    2014-01-01

    Super-hydrophobic surfaces are bio-inspired interfaces with a superficial texture that, in its most common evolution, is formed by a periodic lattice of silicon micro-pillars. Similar surfaces reveal superior properties compared to conventional flat surfaces, including very low friction coefficients. In this work, we modified meso-porous silicon micro-pillars to incorporate networks of metal nano-particles into the porous matrix. In doing so, we obtained a multifunctional-hierarchical system in which (i) at a larger micrometric scale, the super-hydrophobic pillars bring the molecules dissolved in an ultralow-concentration droplet to the active sites of the device, (ii) at an intermediate meso-scale, the meso-porous silicon film adsorbs the low molecular weight content of the solution and, (iii) at a smaller nanometric scale, the aggregates of silver nano-particles would measure the target molecules with unprecedented sensitivity. In the results, we demonstrated how this scheme can be utilized to isolate and detect small molecules in a diluted solution in very low abundance ranges. The presented platform, coupled to Raman or other spectroscopy techniques, is a realistic candidate for the protein expression profiling of biological fluids. © 2014 the Partner Organisations.

  7. DOE/RL Hanford Site Air Operating Permit Annual Compliance Certification Report for the Period July 2 2001 through December 31 2001 [SEC 1 and 2

    International Nuclear Information System (INIS)

    GREEN, W.E.

    2002-01-01

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. The AOP, Section 4.3.4, ''Annual Compliance Certification'', requires submittal of an annual compliance certification report no later than 12 months following the effective date of the permit. This report is to be certified for truth, accuracy, and completeness by a Responsible Official. This first annual compliance certification report contains information for the period from July 2, 2001 through December 31, 2001. Hereafter, the annual compliance certification report will contain information for the period from January 1 through December 31, as required by the AOP Section 4.3, ''Submittals''. Copies of the annual compliance certification reports are transmitted to the Washington State Department of Ecology (Ecology), the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the U.S. Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, Section 4.3.3, ''Annual Compliance Certification'', requires the following content for the annual compliance certification report: (1) The identification of each term or condition of the permit that is the basis of the certification; (2) The compliance status; (3) Whether compliance was continuous or intermittent; (4) The method(s) used to determine the compliance status of the source over the reporting period consistent with Washington Administrative Code (WAC) 173401 -61 5(3)(a); and (5) Such other facts as Ecology, WDOH, or BCAA might be required to determine the compliance status of the source. According to WAC 173-401-630(5), no certification is required for insignificant emission units. The specific terms and conditions for this annual compliance certification report consist of all emission point specific terms and conditions contained in the AOP Attachment 1 and Attachment 2 tables, plus Attachment 3 for asbestos and open burning

  8. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2001-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document is updated on a quarterly basis

  9. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2000-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, Notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document will be updated on a quarterly basis

  10. EPA Region 2 Discharge Pipes for Facilites with NPDES Permits from the Permit Compliance GIS Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Permit and Compliance System (PCS) contains data on the National Pollution Discharge Elimination Systems (NPDES) permit-holding facilities. This includes...

  11. Wind Energy Industry Eagle Detection and Deterrents: Research Gaps and Solutions Workshop Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Sinclair, Karin [National Renewable Energy Lab. (NREL), Golden, CO (United States); DeGeorge, Elise [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-04-13

    The Bald and Golden Eagle Protection Act (BGEPA) prohibits the 'take' of these birds. The act defines take as to 'pursue, shoot, shoot at, poison, wound, kill, capture, trap, collect, destroy, molest or disturb.' The 2009 Eagle Permit Rule (74 FR 46836) authorizes the U.S. Fish and Wildlife Service (USFWS) to issue nonpurposeful (i.e., incidental) take permits, and the USFWS 2013 Eagle Conservation Plan Guidance provides a voluntary framework for issuing programmatic take permits to wind facilities that incorporate scientifically supportable advanced conservation practices (ACPs). Under these rules, the Service can issue permits that authorize individual instances of take of bald and golden eagles when the take is associated with, but not the purpose of, an otherwise lawful activity, and cannot practicably be avoided. To date, the USFWS has not approved any ACPs, citing the lack of evidence for 'scientifically supportable measures.' The Eagle Detection and Deterrents Research Gaps and Solutions Workshop was convened at the National Renewable Energy Laboratory in December 2015 with a goal to comprehensively assess the current state of technologies to detect and deter eagles from wind energy sites and the key gaps concerning reducing eagle fatalities and facilitating permitting under the BGEPA. During the workshop, presentations and discussions focused primarily on existing knowledge (and limitations) about the biology of eagles as well as technologies and emerging or novel ideas, including innovative applications of tools developed for use in other sectors, such as the U.S. Department of Defense and aviation. The main activity of the workshop was the breakout sessions, which focused on the current state of detection and deterrent technologies and novel concepts/applications for detecting and minimizing eagle collisions with wind turbines. Following the breakout sessions, participants were asked about their individual impressions of the

  12. 77 FR 22267 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-04-13

    ... with rotating wind turbines. Permit Duration and Transferability In February 2011, we published draft... permit applicants, because of the known risk to eagles from collisions with wind turbines and electric... change does not affect the tenure of any other migratory bird or eagle permit type. DATES: Electronic...

  13. How to characterize a potential site for CO2 storage with sparse data coverage - a Danish onshore site case

    International Nuclear Information System (INIS)

    Nielsen, Carsten Moller; Frykman, Peter; Dalhoff, Finn

    2015-01-01

    The paper demonstrates how a potential site for CO 2 storage can be evaluated up to a sufficient level of characterization for compiling a storage permit application, even if the site is only sparsely explored. The focus of the paper is on a risk driven characterization procedure. In the initial state of a site characterization process with sparse data coverage, the regional geological and stratigraphic understanding of the area of interest can help strengthen a first model construction for predictive modeling. Static and dynamic modeling in combination with a comprehensive risk assessment can guide the different elements needed to be evaluated for fulfilling a permit application. Several essential parameters must be evaluated; the storage capacity for the site must be acceptable for the project life of the operation, the trap configuration must be efficient to secure long term containment, the injectivity must be sufficient to secure a longstanding stable operation and finally a satisfactory and operational measuring strategy must be designed. The characterization procedure is demonstrated for a deep onshore aquifer in the northern part of Denmark, the Vedsted site. The site is an anticlinal structural closure in an Upper Triassic - Lower Jurassic sandstone formation at 1 800-1 900 m depth. (authors)

  14. Waste Isolation Pilot Plant Annual Site Environmental Report for 2010

    International Nuclear Information System (INIS)

    2011-01-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) Characterize site environmental management performance. (2) Summarize environmental occurrences and responses reported during the calendar year. (3) Confirm compliance with environmental standards and requirements. (4) Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the WIPP. DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit Number NM4890139088-TSDF (Permit) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

  15. Waste Isolation Pilot Plant Annual Site Environmental Report for 2010

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) Characterize site environmental management performance. (2) Summarize environmental occurrences and responses reported during the calendar year. (3) Confirm compliance with environmental standards and requirements. (4) Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the WIPP. DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit Number NM4890139088-TSDF (Permit) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

  16. The voluntary siting process: The solution to siting in the Northeast Compact

    International Nuclear Information System (INIS)

    Deshais, J.B.

    1995-01-01

    The date: June 10, 1991. The decision: the announcement of three 'candidate sites' for a low-level radioactive waste (LLRW) facility in Connecticut following statewide screening. The debate: the right of the citizens of the state to refuse to have this type of facility in their 'backyard' versus the State's responsibility to provide for the safe management of LLRW generated within its borders. The debacle: vigorous opposition, political involvement, no opportunity for effective dialogue with the candidate towns. The end: a legislative mandate to terminate the siting process. This series of events, familiar to those in the business of attempting to site and develop unwanted and unwelcome facilities, would have thwarted efforts to provide for disposal capacity in the Northeast Compact region. Connecticut's efforts to site a LLRW disposal facility pursuant to a traditional 'decide-announce-defend' approach had apparently failed. New Jersey, its partner in the Compact, was also ready to proceed with a similar process that would lead to the naming of several candidate sites, but suspended its efforts to review other siting alternatives. The problem: a new approach was needed. The answer: both states would pursue voluntary siting for the LLRW facilities. The result: the best chance for successful development of LLRW disposal capacity in the Northeast Compact region

  17. 50 CFR 679.4 - Permits.

    Science.gov (United States)

    2010-10-01

    ... this section, with the exception that an IFQ hired master permit or a CDQ hired master permit need not... program permit or card type is: Permit is in effect from issue date through the end of: For more... section (C) Halibut & sablefish hired master permits Specified fishing year Paragraph (d)(2) of this...

  18. 77 FR 64843 - Actions on Special Permit Applications

    Science.gov (United States)

    2012-10-23

    ... modify the Industrial 173.150(b); special permit to Products dba 173.222(c); authorize the Invensys 173... changed from package to packaging would allow the containers to be shipped back to the manufacturer for... Base, IL. 176.84(c)(2); ammunition on and 176.136. United States Navy Container Ships. (mode 3) DENIED...

  19. Wind Power Opportunities in St. Thomas, USVI: A Site-Specific Evaluation and Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.; Warren, A.; Roberts, J. O.; Gevorgian, V.

    2012-09-01

    This NREL technical report utilizes a development framework originated by NREL and known by the acronym SROPTTC to assist the U.S. Virgin Islands in identifying and understanding concrete opportunities for wind power development in the territory. The report covers each of the seven components of the SROPTTC framework: Site, Resource, Off-take, Permitting, Technology, Team, and Capital as they apply to wind power in the USVI and specifically to a site in Bovoni, St. Thomas. The report concludes that Bovoni peninsula is a strong candidate for utility-scale wind generation in the territory. It represents a reasonable compromise in terms of wind resource, distance from residences, and developable terrain. Hurricane risk and variable terrain on the peninsula and on potential equipment transport routes add technical and logistical challenges but do not appear to represent insurmountable barriers. In addition, integration of wind power into the St. Thomas power system will present operational challenges, but based on experience in other islanded power systems, there are reasonable solutions for addressing these challenges.

  20. Nevada test site annual site environmental report for calendar year 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    Monitoring and surveillance on and around the Nevada Test Site (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1995 indicated that operations on the NTS were conducted in compliance with applicable federal and DOE regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of effluents, or resuspension was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act (NEPA) is being achieved and, where mandated, permits for air and water effluents and waste management have been obtained from the appropriate agencies. Cooperation with other agencies has resulted in seven different consent orders and agreements. Support facilities at off-NTS locations complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

  1. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  2. Hanford Site comprehensive compliance evaluation report - July 1, 1997 through June 30, 1998

    International Nuclear Information System (INIS)

    Haggard, R.D.

    1998-01-01

    On September 9, 1992, the US Environmental Protection Agency (EPA) issued General Permit No. WA-R-00-OOOF, Authorization to Discharge Under the National Pollutant Discharge Elimination System (NPDES) for Storm Water Discharges Associated with Industrial Activity to the US Department of Energy, Richland Operations Office (DOE-RL). DOE-RL submitted a Notice of Intent to comply with this permit to the EPA in accordance with the General Permit requirements on October 1, 1992. On February 14, 1994, EPA issued a Storm Water General Permit Coverage Notice (WA-R-00-Al 7F). The Hanford Site Storm Water Pollution Prevention Plan (SWPPP) (WHC-SD-EN-EV-02 1) was certified by DOE-RL on September 24, 1996, in compliance with Part 4.B(i) of the General Permit. As required by General Permit, Section 4, Part D, Section 4.c, an annual report must be developed by DOE-RL and retained onsite to verify that the requirements listed in the General Permit are implemented. This document fulfills the requirement to prepare an annual report and contains the results of inspections of the storm water discharges listed in Appendix B. This report also describes the methods used to conduct the Storm Water Comprehensive Site Compliance Evaluation (SWCSCE) as required in the General Permit, Part 4, Section D.4.c; summarizes the results of the compliance evaluation; and documents significant leaks and spills. The time frames for this SWCSCE report is July 1, 1997 through June 30, 1998. There were no significant spills or leaks during this reporting period

  3. Alternative energy facility siting policies for urban coastal areas: executive summary of findings and policy recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Morell, D; Singer, G

    1980-11-01

    An analysis was made of siting issues in the coastal zone, one of the nation's most critical natural resource areas and one which is often the target for energy development proposals. The analysis addressed the changing perceptions of citizens toward energy development in the coastal zone, emphasizing urban communities where access to the waterfront and revitalization of waterfront property are of interest to the citizen. The findings of this analysis are based on an examination of energy development along New Jersey's urban waterfront and along the Texas-Louisiana Gulf Coast, and on redevelopment efforts in Seattle, San Francisco, Boston, and elsewhere. The case studies demonstrate the significance of local attitudes and regional cooperation in the siting process. In highly urbanized areas, air quality has become a predominant concern among citizen groups and an influential factor in development of alternative energy facility siting strategies, such as consideration of inland siting connected by pipeline to a smaller coastal facility. The study addresses the economic impact of the permitting process on the desirability of energy facility investments, and the possible effects of the location selected for the facility on the permitting process and investment economics. The economic analysis demonstrates the importance of viewing energy facility investments in a broad perspective that includes the positive or negative impacts of various alternative siting patterns on the permitting process. Conclusions drawn from the studies regarding Federal, state, local, and corporate politics; regulatory, permitting, licensing, environmental assessment, and site selection are summarized. (MCW)

  4. Permit.LOA table

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This table includes the effective dates by vessel and permit number for each issued letter of authorization (LOA) by the Permit Office (APSD)

  5. Third report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    Energy Technology Data Exchange (ETDEWEB)

    Hinzman, R.L. [ed.; Adams, S.M.; Ashwood, T.L. [Oak Ridge National Lab., TN (United States)] [and others

    1995-08-01

    As a condition of the modified National Pollutant Discharge Elimination System (NPDES) permit issued to the Oak Ridge Gaseous Diffusion Plant (ORGDP; now referred to as the Oak Ridge K-25 Site) on September 11, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream (Mitchell Branch or K-1700 stream). On October 1, 1992, a renewed NPDES permit was issued for the K-25 Site. A biological monitoring plan was submitted for Mitchell Branch, Poplar Creek, Poplar Creek Embayment of the Clinch River and any unnamed tributaries of these streams. The objectives of BMAP are to (1) demonstrate that the effluent limitations established for the Oak Ridge K-25 Site protect and maintain the use of Mitchell Branch for growth and propagation of fish and other aquatic life and (2) document the effects on stream biota resulting from operation of major new pollution abatement facilities, including the Central Neutralization Facility (CNF) and the Toxic Substances Control Act (TSCA) incinerator. The BMAP consists of four tasks: (1) toxicity monitoring; (2) bioaccumulation monitoring; (3) assessment of fish health; and (4) instream monitoring of biological communities, including benthic macroinvertebrates and fish. This document, the third in a series, reports on the results of the Oak Ridge K-25 Site BMAP; it describes studies that were conducted over various periods of time between June 1990 and December 1993, although monitoring conducted outside this time period is included, as appropriate.

  6. Third report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    International Nuclear Information System (INIS)

    Hinzman, R.L.

    1995-08-01

    As a condition of the modified National Pollutant Discharge Elimination System (NPDES) permit issued to the Oak Ridge Gaseous Diffusion Plant (ORGDP; now referred to as the Oak Ridge K-25 Site) on September 11, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream (Mitchell Branch or K-1700 stream). On October 1, 1992, a renewed NPDES permit was issued for the K-25 Site. A biological monitoring plan was submitted for Mitchell Branch, Poplar Creek, Poplar Creek Embayment of the Clinch River and any unnamed tributaries of these streams. The objectives of BMAP are to (1) demonstrate that the effluent limitations established for the Oak Ridge K-25 Site protect and maintain the use of Mitchell Branch for growth and propagation of fish and other aquatic life and (2) document the effects on stream biota resulting from operation of major new pollution abatement facilities, including the Central Neutralization Facility (CNF) and the Toxic Substances Control Act (TSCA) incinerator. The BMAP consists of four tasks: (1) toxicity monitoring; (2) bioaccumulation monitoring; (3) assessment of fish health; and (4) instream monitoring of biological communities, including benthic macroinvertebrates and fish. This document, the third in a series, reports on the results of the Oak Ridge K-25 Site BMAP; it describes studies that were conducted over various periods of time between June 1990 and December 1993, although monitoring conducted outside this time period is included, as appropriate

  7. HANFORD SITE AIR OPERATING PERMIT SEMIANNUAL REPORT FOR THE PERIOD 07/01/2004 THRU 12/31/2004

    Energy Technology Data Exchange (ETDEWEB)

    GREEN, W.E.

    2005-01-19

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. One condition contained in the AOP, ''Standard Terms and Conditions'', Section 4.3.3, is the requirement to submit semiannual reports by March 15th and September 15th each year, which are certified for truth, accuracy, and completeness by a Responsible Official. This semiannual report contains information from July 1, 2004 through December 31, 2004. Copies of semiannual reports are transmitted to the Washington State Department of Ecology (Ecology). the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the US Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, AOP, ''Standard Terms and Conditions'', Section 4.3.3, as amended in August 2002 and December 2002, identifies the following. (1) Each semiannual report will provide a reference to deviation reports submitted to the regulatory agencies as required by Section 4.5. ''Permit Deviation Reporting''. (2) Each semiannual report will consist of reports of any required monitoring not submitted previously to the agencies or a reference to reports of required monitoring submitted during the reporting period. (3) Each semiannual report will contain a summary of any substantiated air emission complaint investigation(s) required in Table 1.2 of AOP, Attachment 1, and issued during the reporting period. (4) For all minor radioactive emission points (potential to emit <0.1 mrem to the maximally exposed individual) listed in AOP, Attachment 2. Tables 1.2. 1.3, and 2.1, each semiannual report will confirm that any required monitoring was conducted to verify low emissions during the reporting period. Data derived from that monitoring will be reported in the Annual National Emission Standards for Hazardous Air Pollutants (NESHAP) Report (AOP, ''Standard Terms and Conditions

  8. Federal Fisheries Permit (FFP)/ Federal Processor Permit (FPP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Federal Fisheries Permit (FFP) is required for vessels of the United States which are used to fish for groundfish in the Gulf of Alaska or Bering Sea and...

  9. Smoking ban in all restaurants and cafeterias on the CERN site

    CERN Multimedia

    CSR

    2006-01-01

    In 2005 the SCC decided that there would be a total smoking ban in all restaurants and satellite cafeterias on the CERN site, except for the designated area in Restaurant No.1. Unfortunately, it seems that this ban is often over-looked, resulting in an unhealthy and unpleasant environment for the users and staff of these facilities. You are asked to respect this ban and are reminded that smoking is only permitted in the room in Restaurant 1 specially installed for this purpose. The CSR Restaurant Monitoring Committee

  10. Activity coefficients of solutes in binary solvents

    International Nuclear Information System (INIS)

    Gokcen, N.A.

    1982-01-01

    The activity coefficients in dilute ternary systems are discussed in detail by using the Margules equations. Analyses of some relevant data at high temperatures show that the sparingly dissolved solutes in binary solvents follow complex behavior even when the binary solvents are very nearly ideal. It is shown that the activity data on the solute or the binary system cannot permit computation of the remaining activities except for the regular solutions. It is also shown that a fourth-order equation is usually adequate in expressing the activity coefficient of a solute in binary solvents at high temperatures. When the activity data for a binary solvent are difficult to obtain in a certain range of composition, the activity data for a sparingly dissolved solute can be used to supplement determination of the binary activities

  11. DOE/RL Hanford Site Air Operating Permit Annual Compliance Certification Report for the Period July 2 2001 through December 31 2001 [SEC 1 & 2

    Energy Technology Data Exchange (ETDEWEB)

    GREEN, W.E.

    2002-05-22

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. The AOP, Section 4.3.4, ''Annual Compliance Certification'', requires submittal of an annual compliance certification report no later than 12 months following the effective date of the permit. This report is to be certified for truth, accuracy, and completeness by a Responsible Official. This first annual compliance certification report contains information for the period from July 2, 2001 through December 31, 2001. Hereafter, the annual compliance certification report will contain information for the period from January 1 through December 31, as required by the AOP Section 4.3, ''Submittals''. Copies of the annual compliance certification reports are transmitted to the Washington State Department of Ecology (Ecology), the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the U.S. Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, Section 4.3.3, ''Annual Compliance Certification'', requires the following content for the annual compliance certification report: (1) The identification of each term or condition of the permit that is the basis of the certification; (2) The compliance status; (3) Whether compliance was continuous or intermittent; (4) The method(s) used to determine the compliance status of the source over the reporting period consistent with Washington Administrative Code (WAC) 173401 -61 5(3)(a); and (5) Such other facts as Ecology, WDOH, or BCAA might be required to determine the compliance status of the source. According to WAC 173-401-630(5), no certification is required for insignificant emission units. The specific terms and conditions for this annual compliance certification report consist of all emission point specific terms and conditions contained in the AOP Attachment 1 and Attachment 2 tables, plus Attachment 3 for

  12. The influence of surface roughness and solution concentration on pool boiling process in Diethanolamine aqueous solution

    Science.gov (United States)

    Khoshechin, Mohsen; Salimi, Farhad; Jahangiri, Alireza

    2018-04-01

    In this research, the effect of surface roughness and concentration of solution on bubble departing frequency and nucleation site density for pool boiling of water/diethanolamine (DEA) binary solution were investigated experimentally. In this investigation, boiling heat transfer coefficient, bubble departing frequency and nucleation site density have been experimentally investigated in various concentrations and heat fluxes. Microstructured surfaces with a wide range of well-defined surface roughness were fabricated, and a heat flux between 1.5-86 kW/m2 was achieved under atmospheric conditions. The Results indicated that surface roughness and concentration of solution increase the bubble departing frequency and nucleation site density with increasing heat flux. The boiling heat transfer coefficient in mixtures of water/DEA increases with increasing concentration of DEA in water. The experimental results were compared with predictions of several used correlations in the literatures. Results showed that the boiling heat transfer coefficients of this case study are much higher than the predicted values by major existing correlations and models. The excellent agreement for bubble departing frequency found between the models of Jackob and Fritz (1966) and experimental data and also the nucleation site density were in close agreement with the model of Paul (1983) data. f bubble departure frequency, 1/s or Hz N Number of nucleation sites per area per time R c Minimum cavity size, m D c critical diameter, m g gravitational acceleration, m/s2 ρ density, kg/m3 T temperature, °c ΔT temperature difference, °c d d vapor bubble diameter, m h fg enthalpy of vaporization, J/kg R Roughness, μm Ja Jakob number cp specific heat, J/kg °c Pr Prandtl number Ar Archimedes number h Heat transfer coefficient, J/(m2 °c) tg time it takes to grow a bubble, s q/A heat flux (kW/m2) tw time required to heat the layer, s gc Correction coefficient of incompatible units R a Surface

  13. Noncooperative models of permit markets

    Energy Technology Data Exchange (ETDEWEB)

    Godal, Odd

    2011-07-15

    The applicability of some popular and basic permit market theories has been questioned. Drawing on noncooperative equilibrium theory for pure exchange economies, this article adapts several well-established alternative models to permit exchange. Some qualitative properties of the associated equilibria are provided, including two games with equilibria that in a sense coincide. Nevertheless, as there exist quite a few models potentially applicable to emissions trading, with equilibria that range from autarky to Pareto optimality, it seems that economics lacks a broadly accepted basic theory for permit markets. (Author)

  14. Permitting of Landfill Bioreactor Operations: Ten Years after the RD&D Rule

    Science.gov (United States)

    Prior to promulgation of the Rule, there were approximately 20 full-scale bioreactor projects in North America, including one in Canada. Of these, six were permitted by EPA (four Project XL sites and two projects listed separately under a cooperative research agreement at the Ou...

  15. RCRA Part A permit characterization plan for the U-2bu subsidence crater. Revision 1

    International Nuclear Information System (INIS)

    1998-04-01

    This plan presents the characterization strategy for Corrective Action Unit (CAU) 109, U-2bu Subsidence Crater (referred to as U-2bu) in Area 2 at the Nevada Test Site (NTS). The objective of the planned activities is to obtain sufficient characterization data for the crater soils and observed wastes under the conditions of the current Resource Conservation and Recovery Act (RCRA) Part A permit. The scope of the characterization plan includes collecting surface and subsurface soil samples with hand augers and for the purpose of site characterization. The sampling strategy is to characterize the study area soils and look for RCRA constituents. Observable waste soils and surrounding crater soils will be analyzed and evaluated according to RCRA closure criteria. Because of the status of the crater a RCRA Part A permit site, acquired radionuclide analyses will only be evaluated in regards to the health and safety of site workers and the disposition of wastes generated during site characterization. The U-2bu Subsidence Crater was created in 1971 by a Lawrence Livermore National Laboratory underground nuclear test, event name Miniata, and was used as a land-disposal unit for radioactive and hazardous waste from 1973 to 1988

  16. Sociological perspective on the siting of hazardous waste facilities

    International Nuclear Information System (INIS)

    Mileti, D.S.

    1985-01-01

    The site of hazardous waste facilities has been, and will likely continue to be, both an important societal need and a publicity controversial topic. Sites have been denounced, shamed, banned, and moved at the same time that the national need for their installation and use has grown. Based on the available technologies, the effective siting of facilities is more of a major contemporary social issue than it is a technological problem. Traditional social impact assessment approaches to the siting process have generally failed to meaningfully contribute to successful project implementation; these efforts have largely ignored the public perception aspects of risk and hazard on the success or failure of facility siting. It is proposed in this paper that more readily acceptable solutions to siting hazardous waste facilities might result from the integration of two social science approaches: (1) social impact assessment, which seeks to define and mitigate problems, and (2) hazards policy studies, which has sought to understand and incorporate public risk perceptions into effective public decision-making. This paper illustrates how this integration of approaches could be implemented

  17. Impact of Social Networking Sites in Bangladesh: Few Possible Solutions

    OpenAIRE

    Md. Omar Faruq; Alim-Al-Reza; Md. Mahbubur Rahman; Mohammad Raisul Alam

    2017-01-01

    Bangladesh is a developing country. But in few recent years this country is going to be turned as digitalized. The first condition of being digitalization is the whole communication system of the country have to be developed tremendously. If we notice about the communication system, then Social Networking Sites can be a platform of revolution. This study is based on the perspective of Bangladesh on Social Networking Sites(SNS). In Bangladesh, Social Networking Sites ar...

  18. Computer local construction of a general solution for the Chew-Low equations

    International Nuclear Information System (INIS)

    Gerdt, V.P.

    1980-01-01

    General solution of the dynamic form of the Chew-Low equations in the vicinity of the restpoint is considered. A method for calculating coefficients of series being members of such solution is suggested. The results of calculations, coefficients of power series and expansions carried out by means of the SCHOONSCHIP and SYMBAL systems are given. It is noted that the suggested procedure of the Chew-Low equation solutions basing on using an electronic computer as an instrument for analytical calculations permits to obtain detail information on the local structure of general solution

  19. Application of ultra-sons to on-site spent fuel assemblies metrology

    International Nuclear Information System (INIS)

    Gondard, C.; Saglio, R.; Vouillot, M.; Delaroche, P.; Vaubert, Y.; Van Craeynest, J.C.

    1983-12-01

    Fuel assemblies inspection on the site of a power reactor, between two irradiation campaigns, allows to estimate the behaviour of prototype fuel assemblies and to permit their refueling for the continuation of the irradiation; the utilization of non-destructive, reliable and high-performance techniques, is of a great interest in the application. For, this reason, the C.E.A. has been led to carry out new techniques allowing the visual examination and the dimensional inspection of spent fuel assemblies of 900 MWe French pressurized water reactors, with a transportable Fuel Examination Module (MEC) on every reactor site. This module includes a television camera, and uses for the first time as ''position sensor'' the properties offered by a set of ultrasonic transducers. The main principle of the design, of the operation way of the module, of the measuring methods, and, of the data acquisition and processing, are presented [fr

  20. Hard paths, soft paths or no paths? Cross-cultural perceptions of water solutions

    Science.gov (United States)

    Wutich, A.; White, A. C.; White, D. D.; Larson, K. L.; Brewis, A.; Roberts, C.

    2014-01-01

    In this study, we examine how development status and water scarcity shape people's perceptions of "hard path" and "soft path" water solutions. Based on ethnographic research conducted in four semi-rural/peri-urban sites (in Bolivia, Fiji, New Zealand, and the US), we use content analysis to conduct statistical and thematic comparisons of interview data. Our results indicate clear differences associated with development status and, to a lesser extent, water scarcity. People in the two less developed sites were more likely to suggest hard path solutions, less likely to suggest soft path solutions, and more likely to see no path to solutions than people in the more developed sites. Thematically, people in the two less developed sites envisioned solutions that involve small-scale water infrastructure and decentralized, community-based solutions, while people in the more developed sites envisioned solutions that involve large-scale infrastructure and centralized, regulatory water solutions. People in the two water-scarce sites were less likely to suggest soft path solutions and more likely to see no path to solutions (but no more likely to suggest hard path solutions) than people in the water-rich sites. Thematically, people in the two water-rich sites seemed to perceive a wider array of unrealized potential soft path solutions than those in the water-scarce sites. On balance, our findings are encouraging in that they indicate that people are receptive to soft path solutions in a range of sites, even those with limited financial or water resources. Our research points to the need for more studies that investigate the social feasibility of soft path water solutions, particularly in sites with significant financial and natural resource constraints.

  1. The dependence of the 137Cs on the parameters of a soil solution

    International Nuclear Information System (INIS)

    Bulavyin, L.A.; Prorok, V.V.; Agejev, V.A.; Mel'nichenko, L.Yu.; Ostashko, V.V.

    2007-01-01

    Different kinds of rapidly maturing plants were grown simultaneously at experimental sites under natural conditions at the Chernobyl Exclusion Zone. The content of 137 Cs in a plant and in the corresponding soil solution and the content of the soil solution in soil were measured. We have first established that, for all investigated plants and experimental sites, the 137 Cs plant uptake is approximately proportional to the concentration of dissolved 137 Cs in the soil - to the product of the 137 Cs content in the soil solution and the content of the soil solution per unit volume of soil

  2. 50 CFR 21.31 - Rehabilitation permits.

    Science.gov (United States)

    2010-10-01

    ..., foster parenting, research projects, or other permitted activities with persons permitted or otherwise... Response Coordinator or other designated Service representative and obtain permission from the On-Scene Coordinator. All activities within the location of the spill are subject to the authority of the On-Scene...

  3. Artificial Intelligence Support for Landing Site Selection on Mars

    Science.gov (United States)

    Rongier, G.; Pankratius, V.

    2017-12-01

    Mars is a key target for planetary exploration; a better understanding of its evolution and habitability requires roving in situ. Landing site selection is becoming more challenging for scientists as new instruments generate higher data volumes. The involved engineering and scientific constraints make site selection and the anticipation of possible onsite actions into a complex optimization problem: there may be multiple acceptable solutions depending on various goals and assumptions. Solutions must also account for missing data, errors, and potential biases. To address these problems, we propose an AI-informed decision support system that allows scientists, mission designers, engineers, and committees to explore alternative site selection choices based on data. In particular, we demonstrate first results of an exploratory case study using fuzzy logic and a simulation of a rover's mobility map based on the fast marching algorithm. Our system computes favorability maps of the entire planet to facilitate landing site selection and allows a definition of different configurations for rovers, science target priorities, landing ellipses, and other constraints. For a rover similar to NASA's Mars 2020 rover, we present results in form of a site favorability map as well as four derived exploration scenarios that depend on different prioritized scientific targets, all visualizing inherent tradeoffs. Our method uses the NASA PDS Geosciences Node and the NASA/ICA Integrated Database of Planetary Features. Under common assumptions, the data products reveal Eastern Margaritifer Terra and Meridiani Planum to be the most favorable sites due to a high concentration of scientific targets and a flat, easily navigable surface. Our method also allows mission designers to investigate which constraints have the highest impact on the mission exploration potential and to change parameter ranges. Increasing the elevation limit for landing, for example, provides access to many additional

  4. 50 CFR 660.25 - Permits.

    Science.gov (United States)

    2010-10-01

    ... change and the reasons for the request. If the permit requested to be changed to the base permit is..., vessel owner, or permit owner for any reason. The sablefish at-sea processing exemption will expire upon... ownership. (G) For a request to change a permit's ownership that is necessitated by divorce, the individual...

  5. Ambient air monitoring to support HLW repository site characterization

    International Nuclear Information System (INIS)

    Fransioli, P.M.; Dixon, W.R.

    1993-01-01

    Site characterization at the Yucca Mountain site includes an ambient air quality and meteorological monitoring program to provide information for environmental and site characterization issues. The program is designed to provide data for four basic purposes: Atmospheric dispersion calculations to estimate impacts of possible airborne releases of radiological material; Engineering design and extreme weather event characterization; Local climate studies for environmental impact analyses and climate characterization; and, Air quality permits required for site characterization work. The program is compiling a database that will provide the basis for analyses and reporting related to the purposes of the program. Except for reporting particulate matter and limited meteorological data to the State of Nevada for an air quality permit condition, the data have yet to be formally analyzed and reported

  6. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  7. Self-reflection on privacy research in social networking sites

    OpenAIRE

    De Wolf, Ralf; Vanderhoven, Ellen; Berendt, Bettina; Pierson, Jo; Schellens, Tammy

    2017-01-01

    The increasing popularity of social networking sites has been a source of many privacy concerns. To mitigate these concerns and empower users, different forms of educational and technological solutions have been developed. Developing and evaluating such solutions, however, cannot be considered a neutral process. Instead, it is socially bound and interwoven with norms and values of the researchers. In this contribution, we aim to make the research process and development of privacy solutions m...

  8. Comprehensive characterization and hazard assessment of the DOE-Niagara Falls storage site

    International Nuclear Information System (INIS)

    Anderson, T.L.; Dettorre, J.F.; Jackson, D.R.; Ausmus, B.S.

    1981-06-01

    A comprehensive radioecological and nonradiological characterization and hazards assessment was conducted on DOE-Niagara Falls Storage Site. Pitchblende residues and other low-level nuclear waste have been stored on the site since 1944. The most highly radioactive residues were stored in four abandoned buildings, while other wastes were deposited in pits or piled on surface soils on the Site. Several ditches were constructed on the Site to facilitate drainage or excess precipitation. Results of the study will permit the US DOE to form an appropriate remedial action plan for the Site

  9. Controls on soil solution nitrogen along an altitudinal gradient in the Scottish uplands.

    Science.gov (United States)

    Jackson-Blake, L; Helliwell, R C; Britton, A J; Gibbs, S; Coull, M C; Dawson, L

    2012-08-01

    Nitrogen (N) deposition continues to threaten upland ecosystems, contributing to acidification, eutrophication and biodiversity loss. We present results from a monitoring study aimed at investigating the fate of this deposited N within a pristine catchment in the Cairngorm Mountains (Scotland). Six sites were established along an elevation gradient (486-908 m) spanning the key habitats of temperate maritime uplands. Bulk deposition chemistry, soil carbon content, soil solution chemistry, soil temperature and soil moisture content were monitored over a 5 year period. Results were used to assess spatial variability in soil solution N and to investigate the factors and processes driving this variability. Highest soil solution inorganic N concentrations were found in the alpine soils at the top of the hillslope. Soil carbon stock, soil solution dissolved organic carbon (DOC) and factors representing site hydrology were the best predictors of NO(3)(-) concentration, with highest concentrations at low productivity sites with low DOC and freely-draining soils. These factors act as proxies for changing net biological uptake and soil/water contact time, and therefore support the hypothesis that spatial variations in soil solution NO(3)(-) are controlled by habitat N retention capacity. Soil percent carbon was a better predictor of soil solution inorganic N concentration than mass of soil carbon. NH(4)(+) was less affected by soil hydrology than NO(3)(-) and showed the effects of net mineralization inputs, particularly at Racomitrium heath and peaty sites. Soil solution dissolved organic N concentration was strongly related to both DOC and temperature, with a stronger temperature effect at more productive sites. Due to the spatial heterogeneity in N leaching potential, a fine-scale approach to assessing surface water vulnerability to N leaching is recommended over the broad scale, critical loads approach currently in use, particularly for sensitive areas. Copyright © 2012

  10. Title V Permitting Statistics Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Title V Permitting Statistics Inventory contains measured and estimated nationwide statistical data, consisting of counts of permitted sources, types of permits...

  11. Site-specific analysis of the cobbly soils at the Grand Junction processing site

    International Nuclear Information System (INIS)

    1992-06-01

    This report describes a recent site-specific analysis to evaluate the necessity of a recommendation to install a slurry trench around the Grand Junction processing site. The following analysis addresses the cobbly nature of the site's radiologically contaminated foundation soil, reassesses the excavation depths based on bulk radionuclide concentrations, and presents data-based arguments that support the elimination of the initially proposed slurry trench. The slurry trench around the processing site was proposed by the Remedial Action Contractor (RAC) to minimize the amount of water encountered during excavation. The initial depths of excavation developed during conceptual design, which indicated the need for a slurry wall, were reexamined as part of this analysis. This reanalysis, based on bulk concentrations of a cobbly subsoil, supports decreasing the original excavation depth, limiting the dewatering quantities to those which can be dissipated by normal construction activities. This eliminates the need for a slurry trench andseparate water treatment prior to permitted discharge

  12. Chiral symmetry breaking is permitted in supersymmetric QED

    International Nuclear Information System (INIS)

    Walker, M.

    2000-01-01

    Full text: A chirally symmetric theory will generally have a chirally symmetric and a chirally asymmetric solution for the dressed fermionic propagator. It has been claimed that no chirally asymmetric solution for the fermionic propagator exists in supersymmetric QED. This result in the superfield formalism uses a gauge dependent argument whose validity has since been questioned. We present an analogous analysis using the component formalism which demonstrates that chiral symmetry breaking is permitted in this theory. We open the presentation with a brief introduction to supersymmetry, supersymmetric QED, and the superfield formalism. We describe chiral symmetry breaking and the Dyson-Schwinger equation used to analyse it. The derivation of the erroneous theorem claiming the lack of an a chiral propagator is outlined and its flaws discussed. We finish with the equivalent derivation in component fields and our contradictory result

  13. On using residual risk to assess the cost effectiveness and health protectiveness of remedy selection at superfund sites

    International Nuclear Information System (INIS)

    Katsumata, Peter T.; Kastenberg, William E.

    1998-01-01

    This article examines the importance of determining residual risk and its impact on remedy selection at Superfund Sites. Within this examination, risks are assessed using probabilistic models that incorporate the uncertainty and variability of the input parameters, and utilize parameter distributions based on current and applicable site-specific data. Monte Carlo methods are used to propagate these uncertainties and variabilities through the risk calculations resulting in a distribution for the estimate of both risk and residual risk. Such an approach permits an informed decision based on a broad information base which involves considering the entire uncertainty distribution of risk rather than a point estimate for each exposure scenario. Using the probabilistic risk estimates, with current and applicable site-specific data, alternative decisions regarding cleanup are obtained for two Superfund Sites

  14. Refinery siting workbook: appendices A and B

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    The objective of this effort is to develop and provide basic refinery-related information for use by state and local government officials as a basis for establishing responsible refinery siting requirements and policies consistent with the federal clean air and water standards and socio-economic concerns. The report will be organized into two volumes. The main text comprises the basic topics of physical concerns, regulatory requirements, and permitting activities, while the second volume includes the detailed appendix materials such as the applicable laws, and the necessary permits, as available and a glossary of pertinent terms. As a means to this objective, three refinery sizes, 200,000, 100,000 and 30,000 barrels per day crude charge will be discussed in technical terms. Process unit configuration will be presented which will maximize either gasoline or heating oil production with either sweet or sour crude oil feedstocks. The major issues affecting the socio-economic impact of siting the refinery in a given locale will be presented. These data will review the factors affecting the human environment and the issues that must be addressed to assess the impact that a refinery will have on a community. The key federal registrations which impact upon a refinery siting decision shall be reviewed. Summaries of these regulations and a simplified decision diagram for the air and water acts shall be presented to assist both government and refinery officials in understanding the scope of regulatory impact. All pertinent procedures required for refinery permitting shall be reviewed under the generalized headings of air, water, health and safety, land use, and miscellaneous permits. This categorization at the federal, state and local levels of government shall be used as a basis for establishing degrees of emphasis.

  15. 50 CFR 18.31 - Scientific research permits and public display permits.

    Science.gov (United States)

    2010-10-01

    ... the population stock and the marine ecosystem. In determining whether to issue a public display permit... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Scientific research permits and public..., DEPARTMENT OF THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER...

  16. Molecular Theory and the Effects of Solute Attractive Forces on Hydrophobic Interactions.

    Science.gov (United States)

    Chaudhari, Mangesh I; Rempe, Susan B; Asthagiri, D; Tan, L; Pratt, L R

    2016-03-03

    The role of solute attractive forces on hydrophobic interactions is studied by coordinated development of theory and simulation results for Ar atoms in water. We present a concise derivation of the local molecular field (LMF) theory for the effects of solute attractive forces on hydrophobic interactions, a derivation that clarifies the close relation of LMF theory to the EXP approximation applied to this problem long ago. The simulation results show that change from purely repulsive atomic solute interactions to include realistic attractive interactions diminishes the strength of hydrophobic bonds. For the Ar-Ar rdfs considered pointwise, the numerical results for the effects of solute attractive forces on hydrophobic interactions are opposite in sign and larger in magnitude than predicted by LMF theory. That comparison is discussed from the point of view of quasichemical theory, and it is suggested that the first reason for this difference is the incomplete evaluation within LMF theory of the hydration energy of the Ar pair. With a recent suggestion for the system-size extrapolation of the required correlation function integrals, the Ar-Ar rdfs permit evaluation of osmotic second virial coefficients B2. Those B2's also show that incorporation of attractive interactions leads to more positive (repulsive) values. With attractive interactions in play, B2 can change from positive to negative values with increasing temperatures. This is consistent with the puzzling suggestions of decades ago that B2 ≈ 0 for intermediate cases of temperature or solute size. In all cases here, B2 becomes more attractive with increasing temperature.

  17. A Framework for Building Efficient Environmental Permitting Processes

    Directory of Open Access Journals (Sweden)

    Nicola Ulibarri

    2017-01-01

    Full Text Available Despite its importance as a tool for protecting air and water quality, and for mitigating impacts to protected species and ecosystems, the environmental permitting process is widely recognized to be inefficient and marked by delays. This article draws on a literature review and interviews with permitting practitioners to identify factors that contribute to delayed permit decisions. The sociopolitical context, projects that are complex or use novel technology, a fragmented and bureaucratic regulatory regime, serial permit applications and reviews, and applicant and permitting agency knowledge and resources each contribute to permitting inefficiency when they foster uncertainty, increase transaction costs, and allow divergent interests to multiply, yet remain unresolved. We then use the interviews to consider the potential of a collaborative dialogue between permitting agencies and applicants to mitigate these challenges, and argue that collaboration is well positioned to lessen permitting inefficiency.

  18. Savannah River Site Environmental report for 2012

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Michael; Jannik, Timothy; Cauthen, Kim; Bryant, Tracy; Coward, Lori; Eddy, Teresa; Vangelas, Karen; O' Quinn, Sadika; Meyer, Amy; Ackerman, Jana D.; Adams, John; Fanning, Greta; Thompson, Martha; Farfan, Eduardo B.; Dixon, Kenneth L.; Kemmerlin, Robert; Millings, Ted; Maxwell, Sherrod; Blas, Susan; Looney, Brian; Jackson, Dennis; Paller, Michael; Wabbersen, William

    2013-09-12

    This report is an overview of effluent monitoring and environmental surveillance activities conducted on and in the vicinity of SRS from January 1 through December 31, 2012 - including the Site's performance against applicable standards and requirements. Details are provided on major programs such as the Environmental Management System (EMS) and permit compliance.

  19. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  20. Resource Conservation and Recovery Act: Part B, Permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revison 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements.

  1. Hanford Site Air Operating Permit Semiannual Report for the period July 21 2001 Thru December 31 2001

    International Nuclear Information System (INIS)

    GREEN, W.E.

    2002-01-01

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. One condition contained in the AOP, ''Standard Terms and Conditions'', Section 4.3.3, is the requirement to submit semiannual reports by March 15th and August 15th each year, which are certified for truth and accuracy by a Responsible Official. This first semiannual report contains information for the period from July 2, 2001 through December 31, 2001. Hereafter, the March 15th semiannual report will contain information for the period from July 1 through December 31. The semiannual report submitted by August 15th will contain information for the period from January 1 through June 30. Copies of the semiannual reports are transmitted to the Washington State Department of Ecology (Ecology), the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the U.S. Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, AOP, ''Standard Terms and Conditions'', Section 4.3.3, identifies the following: (1) Each semiannual report will provide a reference to deviation reports submitted to the regulatory agencies as required by Section 4.5, ''Permit Deviation Reporting''. (2) Each semiannual report will consist of reports of any required monitoring not submitted previously to the agencies or a reference to reports of required monitoring that were submitted during the reporting period. (3) Each semiannual report will contain a summary of any substantiated air emission complaint investigation(s) required in Table 1.2 of AOP, Attachment 1, and issued during the reporting period (4) For all minor radioactive emission points (potential to emit <0.1 mrem to the maximally exposed individual) listed in AOP, Attachment 2. Tables 1.2, 1.3 and 2.1. each semiannual report will confirm that any required monitoring was conducted to verify low emissions during the reporting period. The data derived from that monitoring will be reported

  2. Hanford Site Air Operating Permit Semiannual Report for the period July 21 2001 Thru December 31 2001

    Energy Technology Data Exchange (ETDEWEB)

    GREEN, W.E.

    2002-02-01

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. One condition contained in the AOP, ''Standard Terms and Conditions'', Section 4.3.3, is the requirement to submit semiannual reports by March 15th and August 15th each year, which are certified for truth and accuracy by a Responsible Official. This first semiannual report contains information for the period from July 2, 2001 through December 31, 2001. Hereafter, the March 15th semiannual report will contain information for the period from July 1 through December 31. The semiannual report submitted by August 15th will contain information for the period from January 1 through June 30. Copies of the semiannual reports are transmitted to the Washington State Department of Ecology (Ecology), the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the U.S. Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, AOP, ''Standard Terms and Conditions'', Section 4.3.3, identifies the following: (1) Each semiannual report will provide a reference to deviation reports submitted to the regulatory agencies as required by Section 4.5, ''Permit Deviation Reporting''. (2) Each semiannual report will consist of reports of any required monitoring not submitted previously to the agencies or a reference to reports of required monitoring that were submitted during the reporting period. (3) Each semiannual report will contain a summary of any substantiated air emission complaint investigation(s) required in Table 1.2 of AOP, Attachment 1, and issued during the reporting period (4) For all minor radioactive emission points (potential to emit <0.1 mrem to the maximally exposed individual) listed in AOP, Attachment 2. Tables 1.2, 1.3 and 2.1. each semiannual report will confirm that any required monitoring was conducted to verify low emissions during the reporting

  3. 50 CFR 13.12 - General information requirements on applications for permits.

    Science.gov (United States)

    2010-10-01

    ... available, occupation, and any business, agency, organizational, or institutional affiliation associated... permits, together with any additional justification, including supporting documentation as required by the... permit Section Importation at nondesignated ports: Scientific 14.31 Deterioration prevention 14.32...

  4. GEOSURF: a computer program for modeling adsorption on mineral surfaces from aqueous solution

    Science.gov (United States)

    Sahai, Nita; Sverjensky, Dimitri A.

    1998-11-01

    A new program, GEOSURF, has been developed for calculating aqueous and surface speciation consistent with the triple-layer model of surface complexation. GEOSURF is an extension of the original programs MINEQL, MICROQL and HYDRAQL. We present, here, the basic algorithm of GEOSURF along with a description of the new features implemented. GEOSURF is linked to internally consistent data bases for surface species (SURFK.DAT) and for aqueous species (AQSOL.DAT). SURFK.DAT contains properties of minerals such as site densities, and equilibrium constants for adsorption of aqueous protons and electrolyte ions on a variety of oxides and hydroxides. The Helgeson, Kirkham and Flowers version of the extended Debye-Huckel Equation for 1:1 electrolytes is implemented for calculating aqueous activity coefficients. This permits the calculation of speciation at ionic strengths greater than 0.5 M. The activity of water is computed explicitly from the osmotic coefficient of the solution, and the total amount of electrolyte cation (or anion) is adjusted to satisfy the electroneutrality condition. Finally, the use of standard symbols for chemical species rather than species identification numbers is included to facilitate use of the program. One of the main limitations of GEOSURF is that aqueous and surface speciation can only be calculated at fixed pH and at fixed concentration of total adsorbate. Thus, the program cannot perform reaction-path calculations: it cannot determine whether or not a solution is over- or under-saturated with respect to one or more solid phases. To check the proper running of GEOSURF, we have compared results generated by GEOSURF with those from two other programs, HYDRAQL and EQ3. The Davies equation and the "bdot" equation, respectively, are used in the latter two programs for calculating aqueous activity coefficients. An example of the model fit to experimental data for rutile in 0.001 M-2.0 M NaNO 3 is included.

  5. Banking and back-loading emission permits

    International Nuclear Information System (INIS)

    Chaton, Corinne; Creti, Anna; Peluchon, Benoît

    2015-01-01

    In this article we focus on the so-called back-loading policy adopted by the European Commission to increase the carbon market price. This environmental measure consists of removing a share of the allowances allocated for a given period in order to reallocate some or all of them later on. To analyze the impact of the permits back-loading, we determine the CO 2 price equilibrium with and without the policy measure, considering not only the market for permits but also the output market of regulated sectors. We propose a two-period model, where the market for permits is perfectly competitive, and the output market can be either competitive or oligopolistic. First, we define the condition under which banking from one period to another is optimal. This condition, that is the absence of arbitrage opportunities (AOA), depends not only from the period initial allocation but also on production market fundamentals. When this condition is satisfied, the market for emission is shown intertemporally efficient. Second, we point out that the back-loading measure may create inefficiencies or leave unaffected the permits price, if it alters the AOA. -- Highlights: •Relationship between the market for permits and the output market of regulated sectors. •Analysis of CO 2 prices and banking. •Impact of a recent environmental policy measure (backloading) on CO 2 prices

  6. HANDBOOK: GUIDANCE ON SETTING PERMIT CONDITIONS AND REPORTING TRIAL BURN RESULTS

    Science.gov (United States)

    This Handbook provides guidance for establishing operational conditions for incinerators. he document provides a means for state and local agencies to achieve a level of consistency in setting permit conditions that will result in establishment of more uniform permit conditions n...

  7. On-Site Decontamination System for Liquid Low Level Radioactive Waste - 13010

    Energy Technology Data Exchange (ETDEWEB)

    OSMANLIOGLU, Ahmet Erdal [Cekmece Nuclear Research and Training Center, Kucukcekmece Istanbul (Turkey)

    2013-07-01

    This study is based on an evaluation of purification methods for liquid low-level radioactive waste (LLLW) by using natural zeolite. Generally the volume of liquid low-level waste is relatively large and the specific activity is rather low when compared to other radioactive waste types. In this study, a pilot scale column was used with natural zeolite as an ion exchanger media. Decontamination and minimization of LLLW especially at the generation site decrease operational cost in waste management operations. Portable pilot scale column was constructed for decontamination of LLW on site. Effect of temperature on the radionuclide adsorption of the zeolite was determined to optimize the waste solution temperature for the plant scale operations. In addition, effect of pH on the radionuclide uptake of the zeolite column was determined to optimize the waste solution pH for the plant scale operations. The advantages of this method used for the processing of LLLW are discussed in this paper. (authors)

  8. Experiment Dashboard - a generic, scalable solution for monitoring of the LHC computing activities, distributed sites and services

    International Nuclear Information System (INIS)

    Andreeva, J; Cinquilli, M; Dieguez, D; Dzhunov, I; Karavakis, E; Karhula, P; Kenyon, M; Kokoszkiewicz, L; Nowotka, M; Ro, G; Saiz, P; Tuckett, D; Sargsyan, L; Schovancova, J

    2012-01-01

    The Experiment Dashboard system provides common solutions for monitoring job processing, data transfers and site/service usability. Over the last seven years, it proved to play a crucial role in the monitoring of the LHC computing activities, distributed sites and services. It has been one of the key elements during the commissioning of the distributed computing systems of the LHC experiments. The first years of data taking represented a serious test for Experiment Dashboard in terms of functionality, scalability and performance. And given that the usage of the Experiment Dashboard applications has been steadily increasing over time, it can be asserted that all the objectives were fully accomplished.

  9. Consequence estimation for decontaminated sites and facilities

    International Nuclear Information System (INIS)

    Niemczyk, S.J.

    1988-01-01

    To aid the US EPA's selection of decommissioning criteria for unrestricted release of cleaned up sites and facilities, a new approach has been developed for estimating the potential hazard from residual radioactivity. That approach, intended to provide conservatively realistic estimates of radiation doses to individual residents from such radioactivity in the environment and in buildings, uses a comprehensive yet relatively simple set of physically-based risk-level environmental transport and exposure pathway models. Doses are estimated for up to 10,000 years. Radioactive decay and ingrowth are explicitly accounted for. Compared to some other approaches, the new approach has several outstanding features. First, some of its models are less conservative than the comparable models in other approaches. Second, the new approach includes models for estimating certain doses in multi-room buildings. Third, the approach's integrated set of transport and behavior models permits straightforward consideration of situations with significant movement of radioactivity within the environment and/or significant radioactive ingrowth. Fourth, the approach's efficient solution techniques, combined with its comprehensive set of transport and behavior models, make consideration of many situations practical. And fifth, the associated computer code runs on a personal computer. The new approach constitutes a significant first step toward a set of comprehensive relationships for providing dose and health risk estimates for residual radioactivity at a variety of sites and facilities

  10. Meeting NPDES permit limits for an effluent-dependent stream

    International Nuclear Information System (INIS)

    Payne, W.L.

    1998-01-01

    When the Savannah River Site in Aiken, South Carolina received a National Pollutant Discharge Elimination System permit containing very low copper and toxicity limits for an effluent-dependent stream, an innovative and cost-effective method to meet them was sought. The South Carolina Department of Health and Environmental Control mandated that compliance with the new limits be achieved within three years of the effective date of the permit. SRS personnel studied various regulatory options for complying with the new limits including Water Effect Ratio, use of a Metals Translator, blending with additional effluents, and outfall relocation. Regulatory options were determined to not be feasible because the receiving stream is effluent dependent. Treatment options were studied after it was determined that none of the regulatory pathways were viable. Corrosion inhibitors were evaluated on a full-scale basis with only limited benefits. Ion exchange was promising, but not cost effective for a high flow effluent with a very low concentration of copper. A treatment wetlands, not normally given consideration for the removal of metals, proved to be the most cost effective method studied and is currently under construction

  11. Hoogsteen base pairs proximal and distal to echinomycin binding sites on DNA

    International Nuclear Information System (INIS)

    Mendel, D.; Dervan, P.B.

    1987-01-01

    Forms of the DNA double helix containing non-Watson-Crick base-pairing have been discovered recently based on x-ray diffraction analysis of quionoxaline antibiotic-oligonucleotide complexes. In an effort to find evidence for Hoogsteen base-pairing at quinoxaline-binding sites in solution, chemical footprinting (differential cleavage reactivity) of echinomycin bound to DNA restriction fragments was examined. The authors report that purines (A>G) in the first and/or fourth base-pair positions of occupied echinomycin-binding sites are hyperreactive to diethyl pyrocarbonate. The correspondence of the solid-state data and the sites of diethyl pyrocarbonate hyperreactivity suggests that diethyl pyrocarbonate may be a sensitive reagent for the detection of Hoogsteen base-pairing in solution. Moreover, a 12-base-pair segment of alternating A-T DNA, which is 6 base pairs away from the nearest strong echinomycin-binding site, is also hyperreactive to diethyl pyrocarbonate in the presence of echinomycin. This hyperreactive segment may be an altered form of right-handed DNA that is entirely Hoogsteen base-paired

  12. 40 CFR 233.21 - General permits.

    Science.gov (United States)

    2010-07-01

    ... ensure compliance with existing permit conditions an any reporting monitoring, or prenotification... apply for an individual permit. This discretionary authority will be based on concerns for the aquatic environment including compliance with paragraph (b) of this section and the 404(b)(1) Guidelines (40 CFR part...

  13. Results of Tritium Tracking and Groundwater Monitoring at the Hanford Site 200 Area State-Approved Land Disposal Site-FY 1999

    International Nuclear Information System (INIS)

    Barnett, D.B.

    1999-01-01

    The Hanford Site 200 Area Effluent Treatment Facility (ETF) processes contaminated liquids derived from Hanford Site facilities. The clean water generated by these processes is occasionally enriched in tritium and is discharged to the 200 Area State Approved Land Disposal Site (SALDS). Groundwater monitoring for tritium and other constituents is required by the state-issued permit at 21 wells surrounding the facility. During FY 1999, average tritium activities in most wells declined from average activities in 1998. The exception was deep well 69948-77C, where tritium results were at an all-time high (77,000 pCi/L) as a result of the delayed penetration of effluent deeper into the aquifer. Of the 12 constituents with permit enforcement limits, which are monitored in SALDS proximal wells, all were within limits during FY 1999. Water level measurements in nearby wells indicate that a small hydraulic mound exists around the SALDS facility as a result of discharges. This feature is directing groundwater flow radially outward a short distance before the regional northeasterly flow predominates. Evaluation of this condition indicates that the network is currently adequate for tracking potential effects of the SALDS on the groundwater. Recommendations include the discontinuation of ammonia, benzene, tetrahydrofuran, and acetone from the regular groundwater constituent list; designating background well 299-W8-1 as a tritium-tracking well only, and the use of quadruplicate averages of field pH, instead of a single laboratory measurement, as a permit compliance parameter

  14. Aeromedical solutions for aerospace safety.

    Science.gov (United States)

    Kapoor, Pawan; Gaur, Deepak

    2017-10-01

    All facets of activity in the speciality of Aviation Medicine are essentially aimed at enhancing aerospace safety. This paper highlights some innovative changes brought about by Aerospace Medicine in the three major fields of the speciality namely, medical evaluation, aeromedical training and research. Based on lab and field studies, military aircrew are now permitted flying with Modifinil as 'Go' Pill and Zolpidem as 'No-Go' Pill during sustained operations. Several other drugs for disabilities like Hypertension and CAD are now permitted for aviators. Comprehensive revision of policy permitting early return to flying is an on-going process. OPRAM courses for all three streams of aircrew in IAF have contributed to reduce aircraft accident rates. Human Engineering Consultancy and expert advice is provided by specialists at IAM as well as those in the field. In future, the country needs to provide better post-service opportunities to aerospace medicine specialists. This, in turn, will attract bright young minds to the specialty. The ISRO Humanin-Space programme will be an exciting challenge for all in this unique field. Aerospace Medicine continues to provide aerospace safety solutions to the IAF and the aviation industry. The nation needs to continue to utilize and support this specialty.

  15. Nuclear project sites on Shimokita Peninsula in summer 1989

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The present report outlines the current progress in the nuclear projects implemented on the Shimokita Peninsula. At Rokkashomura, Japan Nuclear Fuel Industries is building a uranium enrichment plant. The basic work began in October 1988 and was completed by the end of May, and building work on the plant began. The plant building construction has now progressed to 50% for the first unit of 150,000 SUW/year. The site for the low level radioactive waste storage facility is still flat ground. For the reprocessing plant, Japan Nuclear Fuel Service's permit for waste management business is still before STA. Only road construction, unrelated to licensing, is going on. The completion of the safety examination for reprocessing is expected around 1991. At Higashidorimura, a fishery cooperative has rejected the proposal of compensation, and the compensation problem is at a stalemate. Following a zig-zag course in political disturbances, the Nuclear Ship Mutsu entered its port at Sekinehama in January 1988. Corrosion dots were found on some of the fuel assemblies, and Japan Atomic Energy Research Institute plans to carry out the recovery work in this autumn. Site acquisition procedures for building an Ohma nuclear power plant are now under way. (N.K.)

  16. Towards identifying the active sites on RuO2(110) in catalyzing oxygen evolution  

    DEFF Research Database (Denmark)

    Rao, Reshma R.; Kolb, Manuel J.; Halck, Niels Bendtsen

    2017-01-01

    While the surface atomic structure of RuO2 has been well studied in ultra high vacuum, much less is known about the interaction between water and RuO2 in aqueous solution. In this work, in situ surface X-ray scattering measurements combined with density functional theory (DFT) were used to determ......While the surface atomic structure of RuO2 has been well studied in ultra high vacuum, much less is known about the interaction between water and RuO2 in aqueous solution. In this work, in situ surface X-ray scattering measurements combined with density functional theory (DFT) were used...... on the coordinatively unsaturated Ru sites (CUS) and hydrogen adsorbed to the bridging oxygen sites. At potentials relevant to the oxygen evolution reaction (OER), an –OO species on the Ru CUS sites was detected, which was stabilized by a neighboring –OH group on the Ru CUS or bridge site. Combining potential...

  17. Method for ion exchange purification of sodium iodide solution from heavy metals and potassium microimpurities

    International Nuclear Information System (INIS)

    Smirnov, G.I.; Kachur, N.Ya.; Kostromina, O.N.; Ogorodnikova, A.A.; Khajnakov, S.A.

    1990-01-01

    A method of deep ion exchange purification of sodium iodide solution from heavy metals (iron, nickel, copper, lead) and potassium microimpurities is developed. The method includes multiple sorption of microimpurities on titanium phosphate with their subsequent desorption by sorbent processing with a solution with a solution of 3-6 N nitric acid, first, and then with a neutral solution of 2 % sodium thiosulfate. The given method permits to increase the purification degree of sodium iodide solution by 25-30 %. 2 tabs

  18. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    Energy Technology Data Exchange (ETDEWEB)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  19. Effects of pH and phosphate on metal distribution with emphasis on As speciation and mobilization in soils from a lead smelting site

    International Nuclear Information System (INIS)

    Impellitteri, Christopher A.

    2005-01-01

    Arsenic in soils from the Asarco lead smelter in East Helena, Montana was characterized by X-ray absorption spectroscopy (XAS). Arsenic oxidation state and geochemical speciation were analyzed as a function of depth (two sampling sites) and surface distribution. These results were compared with intensive desorption/dissolution experiments performed in a pH stat reactor for samples from the site with the highest degree of As heterogeneity. The objectives of the study were to investigate the solid-phase geochemical As speciation, assess the speciation of As in solutions equilibrated with the solids under controlled pH (pH=4 or 6) and Eh (using hydrogen or air) environments, observe the effects of phosphate on the release of As into solution, and examine the effects of phosphate on metal mobility in the systems. Arsenic was predominantly found in the As(V) valence state, though there was evidence that As(III) and As(0) were present also. The dominant geochemical phase was scorodite (FeAsO 4 .2H 2 O). The pH was controlled in the pH stat experiments by the addition of equinormal solutions of monoprotic (HNO 3 ), diprotic (H 2 SO 4 ), or triprotic (H 3 PO 4 ) acids. For many of the divalent metal cations, solution concentrations greatly decreased in the presence of phosphate. Solutions were also analyzed for anions. Evidence exists for sulfate release into solution. More As was released into solution at lower pH. A slight increase in solution arsenate occurs with the addition of phosphate, but the risk posed from the increased desorption/dissolution of As must be weighed against the decrease in solution concentrations of many metals especially Pb. If tailings from this site underwent acidification (e.g., acid mine drainage), in situ sequestration of metals by phosphate could be combined with placement of subsurface permeable reactive barriers for capture of As to reduce the risk associated with arsenic and trace metal mobilization. Results from this study could be used

  20. 25 CFR 211.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 211.56 Section 211.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations and Appeals § 211.56 Geological and geophysical permits. Permits to conduct geological and geophysical operations on Indian lands which do not...

  1. Solution weighting for the SAND-II Monte Carlo code

    International Nuclear Information System (INIS)

    Oster, C.A.; McElroy, W.N.; Simons, R.L.; Lippincott, E.P.; Odette, G.R.

    1976-01-01

    Modifications to the SAND-II Error Analysis Monte Carlo code to include solution weighting based on input data uncertainties have been made and are discussed together with background information on the SAND-II algorithm. The new procedure permits input data having smaller uncertainties to have a greater influence on the solution spectrum than do the data having larger uncertainties. The results of an indepth study to find a practical procedure and the first results of its application to three important Interlaboratory LMFBR Reaction Rate (ILRR) program benchmark spectra (CFRMF, ΣΣ, and 235 U fission) are discussed

  2. Hydrogeologic data for science trench boreholes at the Area 5 Radioactive Waste Management Site, Nevada Test Site, Nye County, Nevada

    International Nuclear Information System (INIS)

    1993-12-01

    A program to conduct drilling, sampling, and laboratory testing was designed and implemented to obtain important physical, geochemical, and hydrologic property information for the near surface portion of thick unsaturated alluvial sediments at the Area 5 Radioactive Waste Management Site (RWMS). These data are required to understand and simulate infiltration and redistribution of water as well as the transport of solutes in the immediate vicinity of existing and future low-level, mixed, and high-specific-activity waste disposal cells at the site. The program was designed specifically to meet data needs associated with a Resource Conservation and Recovery Act (RCRA) Part B permit application for disposal of hazardous mixed waste, possible RCRA waivers involving mixed waste, DOE Order 5820.2A, ''Radioactive Waste Management,'' and 40 Code of Federal Regulations (CFR) 191 requirements for land disposal of radioactive waste. The hydrologic condition data, when combined with hydrologic property data, indicate that very little net liquid flow (if any) is occurring in the upper vadose zone, and the direction of movement is upward. It follows that vapor movement is probably the dominant mechanism of water transport in this upper region, except immediately following precipitation events

  3. 77 FR 64450 - Hazardous Materials: Incorporation of Certain Special Permits and Competent Authorities Into...

    Science.gov (United States)

    2012-10-22

    ... posted without change to the Federal Docket Management System (FDMS), including any personal information.... Transportation of solid coal tar pitch compounds. Transportation of certain ammonia solutions in UN1H1 and UN6HA1... production and the transportation stream. Thus, special permits provide a mechanism for testing new...

  4. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To...

  5. Surface phase transitions in cu-based solid solutions

    Science.gov (United States)

    Zhevnenko, S. N.; Chernyshikhin, S. V.

    2017-11-01

    We have measured surface energy in two-component Cu-based systems in H2 + Ar gas atmosphere. The experiments on solid Cu [Ag] and Cu [Co] solutions show presence of phase transitions on the surfaces. Isotherms of the surface energy have singularities (the minimum in the case of copper solid solutions with silver and the maximum in the case of solid solutions with cobalt). In both cases, the surface phase transitions cause deficiency of surface miscibility: formation of a monolayer (multilayer) (Cu-Ag) or of nanoscale particles (Cu-Co). At the same time, according to the volume phase diagrams, the concentration and temperature of the surface phase transitions correspond to the solid solution within the volume. The method permits determining the rate of diffusional creep in addition to the surface energy. The temperature and concentration dependence of the solid solutions' viscosity coefficient supports the fact of the surface phase transitions and provides insights into the diffusion properties of the transforming surfaces.

  6. 25 CFR 212.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 212.56 Section 212.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations, and Appeals § 212.56 Geological and geophysical permits. (a) Permits to conduct geological and geophysical operations on Indian lands which do not...

  7. Conducting Biobehavioral Research in Patients With Advanced Cancer: Recruitment Challenges and Solutions.

    Science.gov (United States)

    Gilbertson-White, Stephanie; Bohr, Nicole; Wickersham, Karen E

    2017-10-01

    Despite significant advances in cancer treatment and symptom management interventions over the last decade, patients continue to struggle with cancer-related symptoms. Adequate baseline and longitudinal data are crucial for designing interventions to improve patient quality of life and reduce symptom burden; however, recruitment of patients with advanced cancer in longitudinal research is difficult. Our purpose is to describe challenges and solutions to recruitment of patients with advanced cancer in two biobehavioral research studies examining cancer-related symptoms. Study 1: Symptom data and peripheral blood for markers of inflammation were collected from newly diagnosed patients receiving chemotherapy on the first day of therapy and every 3-4 weeks for up to 6 months. Study 2: Symptom data, blood, and skin biopsies were collected from cancer patients taking epidermal growth factor receptor inhibitors at specific time points over 4 months. Screening and recruitment results for both studies are summarized. Timing informed consent with baseline data collection prior to treatment initiation was a significant recruitment challenge for both the studies. Possible solutions include tailoring recruitment to fit clinic needs, increasing research staff availability during clinic hours, and adding recruitment sites. Identifying solutions to these challenges will permit the conduct of studies that may lead to identification of factors contributing to variability in symptoms and development of tailored patient interventions for patients with advanced cancer.

  8. Conducting a large, multi-site survey about patients’ views on broad consent: challenges and solutions

    Directory of Open Access Journals (Sweden)

    Maureen E. Smith

    2016-11-01

    Full Text Available Abstract Background As biobanks play an increasing role in the genomic research that will lead to precision medicine, input from diverse and large populations of patients in a variety of health care settings will be important in order to successfully carry out such studies. One important topic is participants’ views towards consent and data sharing, especially since the 2011 Advanced Notice of Proposed Rulemaking (ANPRM, and subsequently the 2015 Notice of Proposed Rulemaking (NPRM were issued by the Department of Health and Human Services (HHS and Office of Science and Technology Policy (OSTP. These notices required that participants consent to research uses of their de-identified tissue samples and most clinical data, and allowing such consent be obtained in a one-time, open-ended or “broad” fashion. Conducting a survey across multiple sites provides clear advantages to either a single site survey or using a large online database, and is a potentially powerful way of understanding the views of diverse populations on this topic. Methods A workgroup of the Electronic Medical Records and Genomics (eMERGE Network, a national consortium of 9 sites (13 separate institutions, 11 clinical centers supported by the National Human Genome Research Institute (NHGRI that combines DNA biorepositories with electronic medical record (EMR systems for large-scale genetic research, conducted a survey to understand patients’ views on consent, sample and data sharing for future research, biobank governance, data protection, and return of research results. Results Working across 9 sites to design and conduct a national survey presented challenges in organization, meeting human subjects guidelines at each institution, and survey development and implementation. The challenges were met through a committee structure to address each aspect of the project with representatives from all sites. Each committee’s output was integrated into the overall survey plan. A

  9. 75 FR 20622 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    .... Permit No. TE-02997A Applicant: University of Hawaii, Hilo, Hawaii. The applicant requests a permit to... scientific research including genetic, morphological and behavioral research on the island of Hawaii in the State of Hawaii for the purpose of enhancing its survival. The applicant also requests a permit to take...

  10. 76 FR 67650 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-11-02

    ... and suggestions on migratory bird permit regulations for a permit to use raptors (birds of prey) in abatement activities. Abatement means the use of trained raptors to flush, scare (haze), or take birds or... for a specific permit authorizing the use of raptors in abatement activities (76 FR 39368). The...

  11. 21 CFR 1312.22 - Application for export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Application for export permit. 1312.22 Section... EXPORTATION OF CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.22 Application for export permit. (a) An application for a permit to export controlled substances shall be made on DEA Form 161...

  12. 9 CFR 78.2 - Handling of certificates, permits, and “S” brand permits for interstate movement of animals.

    Science.gov (United States)

    2010-01-01

    ... âSâ brand permits for interstate movement of animals. 78.2 Section 78.2 Animals and Animal Products... certificates, permits, and “S” brand permits for interstate movement of animals. (a) Any certificate, permit, or “S” brand permit required by this part for the interstate movement of animals shall be delivered...

  13. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  14. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  15. 10 CFR 50.23 - Construction permits.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  16. 2008 Contruction General Permits & Multi-Sector General Permits

    Data.gov (United States)

    U.S. Environmental Protection Agency — View stormwater notices of intent (NOIs) for construction projects under EPA's 2008 Construction General Permit (CGP), for Low Erosivity Waivers (LEWs) submitted...

  17. 2003 Wastewater Land Application Site Performance Reports for the Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Teresa R. Meachum

    2004-02-01

    The 2003 Wastewater Land Application Site Performance Reports for the Idaho National Engineering and Environmental Laboratory describe the conditions for the facilities with State of Idaho Wastewater Land Application Permits. Permit-required monitoring data are summarized, and permit exceedences or environmental impacts relating to the operations of the facilities during the 2003 permit year are discussed.

  18. From thermodynamics to the solutions in gravity theory

    International Nuclear Information System (INIS)

    Zhang, Hongsheng; Li, Xin-Zhou

    2014-01-01

    In a recent work, we present a new point of view to the relation of gravity and thermodynamics, in which we derive the Schwarzschild solution through thermodynamic considerations by the aid of the Misner–Sharp mass in an adiabatic system. In this Letter we continue to investigate the relation between gravity and thermodynamics for obtaining solutions via thermodynamics. We generalize our studies on gravi-thermodynamics in Einstein gravity to modified gravity theories. By using the first law with the assumption that the Misner–Sharp mass is the mass for an adiabatic system, we reproduce the Boulware–Deser–Cai solution in Gauss–Bonnet gravity. Using this gravi-thermodynamic thought, we obtain a NEW class of solution in F(R) gravity in an n-dimensional (n≥3) spacetime which permits three-type (n−2)-dimensional maximally symmetric subspace, as an extension of our recent three-dimensional black hole solution, and four-dimensional Clifton–Barrow solution in F(R) gravity

  19. From thermodynamics to the solutions in gravity theory

    Directory of Open Access Journals (Sweden)

    Hongsheng Zhang

    2014-10-01

    Full Text Available In a recent work, we present a new point of view to the relation of gravity and thermodynamics, in which we derive the Schwarzschild solution through thermodynamic considerations by the aid of the Misner–Sharp mass in an adiabatic system. In this Letter we continue to investigate the relation between gravity and thermodynamics for obtaining solutions via thermodynamics. We generalize our studies on gravi-thermodynamics in Einstein gravity to modified gravity theories. By using the first law with the assumption that the Misner–Sharp mass is the mass for an adiabatic system, we reproduce the Boulware–Deser–Cai solution in Gauss–Bonnet gravity. Using this gravi-thermodynamic thought, we obtain a NEW class of solution in F(R gravity in an n-dimensional (n≥3 spacetime which permits three-type (n−2-dimensional maximally symmetric subspace, as an extension of our recent three-dimensional black hole solution, and four-dimensional Clifton–Barrow solution in F(R gravity.

  20. A stochastic conflict resolution model for trading pollutant discharge permits in river systems.

    Science.gov (United States)

    Niksokhan, Mohammad Hossein; Kerachian, Reza; Amin, Pedram

    2009-07-01

    This paper presents an efficient methodology for developing pollutant discharge permit trading in river systems considering the conflict of interests of involving decision-makers and the stakeholders. In this methodology, a trade-off curve between objectives is developed using a powerful and recently developed multi-objective genetic algorithm technique known as the Nondominated Sorting Genetic Algorithm-II (NSGA-II). The best non-dominated solution on the trade-off curve is defined using the Young conflict resolution theory, which considers the utility functions of decision makers and stakeholders of the system. These utility functions are related to the total treatment cost and a fuzzy risk of violating the water quality standards. The fuzzy risk is evaluated using the Monte Carlo analysis. Finally, an optimization model provides the trading discharge permit policies. The practical utility of the proposed methodology in decision-making is illustrated through a realistic example of the Zarjub River in the northern part of Iran.

  1. On site selection of thermoelectric power plants in polluted environment

    International Nuclear Information System (INIS)

    Gheorghe, A.V.

    1992-01-01

    This paper discusses the environmental impact of combined heat-power plants. The selection of the site of these plants depends on the spatial distribution law of pollutants and their chemical interaction with environment. The solutions of a diffusion equation describing a system of chemically interacting pollutants are given and discussed. The environmental impacts are described in terms of wind and atmosphere stability, effective and built stack height and the source distance parameters. The optimal constructive solutions are judged upon the concentrations of sulfur and nitrogen oxides at the ground level which must be kept under the maximum admissible limit. (author). 8 figs

  2. 75 FR 38128 - Ceva Freight, LLC, Dell Logistics Division, Including On-Site Leased Workers From Prologistix and...

    Science.gov (United States)

    2010-07-01

    ... Logistics Division, Including On-Site Leased Workers From Prologistix and Employment Staffing Solutions... 19, 2010, applicable to workers of CEVA Freight, LLC, Dell Logistics Division, including on-site..., North Carolina location of CEVA Freight, LLC, Dell Logistics Division. The Department has determined...

  3. Automatic Commercial Permit Sets

    Energy Technology Data Exchange (ETDEWEB)

    Grana, Paul [Folsom Labs, Inc., San Francisco, CA (United States)

    2017-12-21

    Final report for Folsom Labs’ Solar Permit Generator project, which has successfully completed, resulting in the development and commercialization of a software toolkit within the cloud-based HelioScope software environment that enables solar engineers to automatically generate and manage draft documents for permit submission.

  4. Legal consequences of the special development plan 'power plant sites' on regional planning and on guidelines for building plans

    International Nuclear Information System (INIS)

    1978-01-01

    The Special Development Plan 'Power plant sites' was made compulsory by the regulation given by the Land government in Juli 1976. For extending the energy supply system this Special Development Plan intends to provide a sufficient amount of power plant sites suitably located with regard to present and future consumption centres and permitting a cooling by means of river water while safeguarding the interests of water resources policy. The Special Development Plan established in accordance with the articles 25 and 27 of the planning law of the Land lays down that 14 specified areas are to be kept free from utilization purposes which could be opposed to the realization of power plant projects. Thus the securing of these (potential) sites has become an objective of area planning and planning of the Land in the sense of article 5 paragraph 4 of the Federal law on area planning. (orig./HP) [de

  5. Supplementary Report on the Regulation of Site Selection and Preparation

    International Nuclear Information System (INIS)

    Webster, Philip

    2014-01-01

    report describes the outcomes from the task, including the survey with a discussion of the survey responses provided by regulatory organisations. The report includes High Level Summaries describing how sites are evaluated, how the sites are selected and how the preferred site is licensed or permitted. The WGRNR also convened a workshop in 2010 in Prague, Czech Republic, which provided an excellent opportunity to discuss the lessons learned in the regulation of site selection, evaluation and site preparation. In December 2011, the CNRA approved the WGRNR proposal to prepare a supplemental report augmenting Report on the Survey on Regulation of Site Selection and Preparation NEA/CNRA/R(2010)3 to address additional siting issues, such as assessing impacts of multi-unit sites, seismicity, security, specific design features of the nuclear power plant (NPP) against the fixed site parameters, public consultation during siting, and to obtain more details on regulatory approaches for new reactor siting including changes or enhancements as a result of the Fukushima Daiichi nuclear power plant accident. This report describes the outcomes from the task, including the survey with a discussion of the survey responses provided by regulatory organisations. The report includes high level summaries describing how external hazards, human-induced hazards, combinations of internal and external hazards, survivability of local infrastructure and emergency preparedness arrangements/feasibility at siting stage are assessed through the siting process. (authors)

  6. A public firm on a market for tradable emission permits. A case study for the Netherlands

    International Nuclear Information System (INIS)

    Koster, J.M.M.

    2001-01-01

    In chapters 2 and 3 a survey is given of the literature concerning imperfections in a market for tradable emission permits. Chapter 2 concentrates on profit maximizing firms functioning on unregulated output markets, while Chapter 3 focuses entirely on the inefficiencies arising from participation in the tradable permit scheme of firms that do not minimize their costs. From the survey of the literature in chapters 2 and 3, it appears that researchers have neglected environmental decision making in public firms of the type that have dominated the utility sectors in Europe during the twentieth century. Although their numbers have been reduced by the deregulation and privatization wave in the past two decades, the public firm has certainly not disappeared from the stage in Europe. In chapter 6 we shall fill this gap in the literature and develop a model of decision making in the public firm that can be applied to its decision on pollution abatement, in particular in case a scheme of tradable emission permits is the instrument of environmental policy. Electricity is one of the traditional utility sectors where the public firm was the dominant form of organization. In order to test the applicability of our public firm model we will use it to simulate the decisions of the Dutch electricity production sector in chapters 8 and 9. The chapters 4 and 5 prepare the ground by presenting the relevant facts about the economic regulation of the electricity sector and the relevant environmental policy. Chapter 4 gives a survey of the organization of production and distribution of electricity in the Netherlands during the period 1989-2001. Chapter 5 gives a sketch of air pollution control policy in the Netherlands in so far as it is relevant for the Dutch electricity sector and for the Dutch chemical industry. In chapter 6 we combine the knowledge of the previous chapters and present a model of a public firm which maximizes its utility from output, emission reduction and

  7. US Department of Energy Nevada Field Office annual site environmental report, 1991

    International Nuclear Information System (INIS)

    Black, S.C.; Latham, A.R.; Townsend, Y.E.

    1992-09-01

    Monitoring and surveillance on and around the Nevada Test Site (NTS) by DOE contractors and Site user organizations during 1991 indicated that underground nuclear testing operations were conducted in compliance with regulations, i.e., the dose the maximally exposed offsite individual could have received was less than 0.09 percent of the guideline for air exposure. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS Indicated that airborne radioactivity from test operations was not detectable off site, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. The calculated maximum effective dose equivalent off site would have been 8.6 x 10 -3 mrem. Any person receiving this dose was also exposed to 142 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped to EPA approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act Is being achieved and, where mandated, permits for air and water discharges and waste management have been obtained from the appropriate agencies. Non-NTS support facilities complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits

  8. The source of groundwater and solutes to Many Devils Wash at a former uranium mill site in Shiprock, New Mexico

    Science.gov (United States)

    Robertson, Andrew J.; Ranalli, Anthony J.; Austin, Stephen A.; Lawlis, Bryan R.

    2016-04-21

    The Shiprock Disposal Site is the location of the former Navajo Mill (Mill), a uranium ore-processing facility, located on a terrace overlooking the San Juan River in the town of Shiprock, New Mexico. Following the closure of the Mill, all tailings and associated materials were encapsulated in a disposal cell built on top of the former Mill and tailings piles. The milling operations, conducted at the site from 1954 to 1968, created radioactive tailings and process-related wastes that are now found in the groundwater. Elevated concentrations of constituents of concern—ammonium, manganese, nitrate, selenium, strontium, sulfate, and uranium—have also been measured in groundwater seeps in the nearby Many Devils Wash arroyo, leading to the inference that these constituents originated from the Mill. These constituents have also been reported in groundwater that is associated with Mancos Shale, the bedrock that underlies the site. The objective of this report is to increase understanding of the source of water and solutes to the groundwater beneath Many Devils Wash and to establish the background concentrations for groundwater that is in contact with the Mancos Shale at the site. This report presents evidence on three working hypotheses: (1) the water and solutes in Many Devils Wash originated from the operations at the former Mill, (2) groundwater in deep aquifers is upwelling under artesian pressure to recharge the shallow groundwater beneath Many Devils Wash, and (3) the groundwater beneath Many Devils Wash originates as precipitation that infiltrates into the shallow aquifer system and discharges to Many Devils Wash in a series of springs on the east side of the wash. The solute concentrations in the shallow groundwater of Many Devils Wash would result from the interaction of the water and the Mancos Shale if the source of water was upwelling from deep aquifers or precipitation.In order to compare the groundwater from various wells to groundwater that has been

  9. Federal and state permits required to open a new uranium mine with comments on uranium development on Indian reservations

    International Nuclear Information System (INIS)

    Root, T.E.; Whisler, J.S.

    1976-01-01

    Three federally related problems are discussed: the environmental impact statement, water discharge permits, and access. A cookbook approach to the permitting process is given as it exists in Wyoming, Utah, New Mexico, and Arizona. The question of jurisdiction is dealt with by using a case study approach to illustrate how jurisdiction bears on uranium development on Indian reservations

  10. Sorption of trace cesium on 21 Hanford Site sediment types

    International Nuclear Information System (INIS)

    Routson, R.C.; Barney, G.S.; Smith, R.M.; Delegard, C.A.

    1980-03-01

    Sorption of trace cesium (Cs) was measured on 21 Hanford Site sediment types. A Box-Behnken statistical design was used to develop empirical-statistical equations predicting 137 Cs sorption as a function of the equilibrium concentrations of macroions Na + , K + , and Ca +2 in solution over the concentration ranges of 3.0 to 0.001M, 0.2 to 0.002M, and 0.2 to 0.002M, respectively. These equations are required to estimate trace Cs transport from Hanford ground disposal sites. Average Cs sorption equations for the 21 sediments will be presented and discussed

  11. Oskarshamn site investigation. Programme for further investigations of bedrock, soil, water and environment in Laxemar subarea

    International Nuclear Information System (INIS)

    2006-03-01

    investigation in Oskarshamn is planned to be made in the spring of 2006 when preliminary safety reports have been presented for both Simpevarp and Laxemar. If the decision should then be that the Simpevarp subarea is chosen, a new investigation programme and a new timetable will be prepared. The overall goal of the site investigation phase is to obtain the permits required to site and build the final repository. The site investigations must therefore provide the data required for an evaluation of the suitability of the investigated sites for a final repository. The material must accordingly be comprehensive enough to: Show whether the selected site satisfies fundamental safety requirements. Show whether the construction-related prerequisites are met. Permit the final repository to be adapted to the conditions and features on the site. Permit an assessment of the impact of the final repository on the environment and society. Permit comparisons between the two investigated sites - Forsmark and Simpevarp/Laxemar. According to SKB's plans, the site investigation in Oskarshamn will be concluded in the late summer of 2007. Monitoring will continue after this time. A large-scale interference test, combined with tracer tests, is also planned

  12. Identification of permit and waste acceptance criteria provisions requiring modification for acceptance of commercial mixed waste

    International Nuclear Information System (INIS)

    1994-03-01

    In October 1990, representatives of States and compact regions requested that the US Department of Energy (DOE) explore an agreement with host States and compact regions under which DOE would accept commercial mixed low-level radioactive waste (LLW) at DOE's own treatment and disposal facilities. A program for DOE management of commercial mixed waste is made potentially more attractive in light of the low commercial mixed waste volumes, high regulatory burdens, public opposition to new disposal sites, and relatively high cost of constructing commercial disposal facilities. Several studies were identified as essential in determining the feasibility of DOE accepting commercial mixed waste for disposal. The purpose of this report is to identify any current or proposed waste acceptance criteria (WAC) or Resource Conservation and Recovery Act (RCRA) provisions that would have to be modified for commercial mixed waste acceptance at specified DOE facilities. Following the introduction, Section 2 of this report (a) provides a background summary of existing and proposed mixed waste disposal facilities at each DOE site, and (b) summarizes the status of any RCRA Part B permit and WAC provisions relating to the disposal of mixed waste, including provisions relating to acceptance of offsite waste. Section 3 provides overall conclusions regarding the current status and permit modifications that must be implemented in order to grant DOE sites authority under their permits to accept commercial mixed waste for disposal. Section 4 contains a list of references

  13. Planning for investigation and evaluation of potential repository sites in Sweden

    International Nuclear Information System (INIS)

    Almen, K.E.; Stroem, A.

    1998-01-01

    The present stage of siting of the Swedish Deep Repository for spent nuclear fuel involves general siting studies on national and regional scales and feasibility studies on a municipal scale. Based on these studies, two areas will be selected for surface-based site investigations. The geoscientific site information will be used in the site evaluation process, in which performance and safety assessments and design studies are the major activities, in combination with geoscientific characterization. The safety report and EIA document from the site investigation stage will be the most important documents in the application for the siting permit and the permit to construct the deep repository. Detailed characterization will then verify the suitability of the selected site. The programme for geoscientific site investigations is based on experience from more than 20 years of field studies in several SKB projects, such as the Study Site Investigations , the Stripa Project, and the Aespoe Hard Rock Laboratory. The strategies and methodologies developed, implemented and verified within the Aespoe HRL are a very important source of information and know-how for the development of the site investigation programme. The investigations will produce geoscientific models that include all information needed to analyze the long-term safety of a deep repository located in and adapted to the geological conditions of the rock. The type of geoscientific information needed for performance and safety assessment, layout and design, environmental studies and for fundamental geoscientific understanding has been specified and compiled in a 'parameter' report. The general strategy is that performance assessment, layout and design studies will be conducted in parallel with the geoscientific investigations. Information will be transferred at logical occasions, when decisions have to be taken and when feedback is desirable for new investigation steps. The role of the geoscientific evaluation is to

  14. Annual Site Environmental Report: 2006

    International Nuclear Information System (INIS)

    Nuckolls, H

    2008-01-01

    chemical use. Program-specific details are discussed below. SLAC operates its air quality management program in compliance with its established permit conditions. The Bay Area Air Quality Management District (BAAQMD) did not conduct a facility inspection of SLAC during 2006, though it did visit the site on four different occasions. The BAAQMD did compliment SLAC for the overall configuration of SLAC's gasoline dispensing facility and of SLAC's asbestos/demolition notification program during two of the visits. DOE awarded SLAC the 2006 Best in Class for Pollution Prevention and Environmental Stewardship Accomplishment in recognition of SLAC's CMS program which manages the procurement and use of chemicals. As an example of the efficiency of the CMS, SLAC reviewed its use of gases and associated tanks and phased out numerous gas tanks that were no longer needed or were not acceptable for long-term storage, in turn, reducing SLAC's on-site chemical inventory. As part of SLAC's waste minimization and management efforts, more than one thousand tons of municipal solid waste was recycled by SLAC during 2006. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2006, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2006, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. The Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low

  15. Effects of pH and phosphate on metal distribution with emphasis on As speciation and mobilization in soils from a lead smelting site

    Energy Technology Data Exchange (ETDEWEB)

    Impellitteri, Christopher A. [United States Environmental Protection Agency, National Risk Management Research Laboratory, 26 West Martin Luther King Drive, Cincinnati, OH 45268 (United States)]. E-mail: Impellitteri.christopher@epa.gov

    2005-06-01

    Arsenic in soils from the Asarco lead smelter in East Helena, Montana was characterized by X-ray absorption spectroscopy (XAS). Arsenic oxidation state and geochemical speciation were analyzed as a function of depth (two sampling sites) and surface distribution. These results were compared with intensive desorption/dissolution experiments performed in a pH stat reactor for samples from the site with the highest degree of As heterogeneity. The objectives of the study were to investigate the solid-phase geochemical As speciation, assess the speciation of As in solutions equilibrated with the solids under controlled pH (pH=4 or 6) and Eh (using hydrogen or air) environments, observe the effects of phosphate on the release of As into solution, and examine the effects of phosphate on metal mobility in the systems. Arsenic was predominantly found in the As(V) valence state, though there was evidence that As(III) and As(0) were present also. The dominant geochemical phase was scorodite (FeAsO{sub 4}.2H{sub 2}O). The pH was controlled in the pH stat experiments by the addition of equinormal solutions of monoprotic (HNO{sub 3}), diprotic (H{sub 2}SO{sub 4}), or triprotic (H{sub 3}PO{sub 4}) acids. For many of the divalent metal cations, solution concentrations greatly decreased in the presence of phosphate. Solutions were also analyzed for anions. Evidence exists for sulfate release into solution. More As was released into solution at lower pH. A slight increase in solution arsenate occurs with the addition of phosphate, but the risk posed from the increased desorption/dissolution of As must be weighed against the decrease in solution concentrations of many metals especially Pb. If tailings from this site underwent acidification (e.g., acid mine drainage), in situ sequestration of metals by phosphate could be combined with placement of subsurface permeable reactive barriers for capture of As to reduce the risk associated with arsenic and trace metal mobilization. Results

  16. Waset Isolation Pilot Plant Annual Site Environmental Report for 2006

    Energy Technology Data Exchange (ETDEWEB)

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2007-09-26

    The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2006 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data that: (a) Characterize site environmental management performance; (b) Summarize environmental occurrences and responses reported during the calendar year; (c) Confirm compliance with environmental standards and requirements; and (d) Highlight significant facility programs and efforts. The DOE Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) maintain and preserve the environmental resources at the WIPP site. DOE Order 231.1A; DOE Order 450.1, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This report was prepared in accordance with DOE Order 231.1A. This order requires that DOE facilities submit an ASER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) (No. NM4890139088-TSDF [treatment, storage, and disposal facility]) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

  17. Waset Isolation Pilot Plant Annual Site Environmental Report for 2006

    International Nuclear Information System (INIS)

    2007-01-01

    The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2006 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data that: (a) Characterize site environmental management performance; (b) Summarize environmental occurrences and responses reported during the calendar year; (c) Confirm compliance with environmental standards and requirements; and (d) Highlight significant facility programs and efforts. The DOE Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) maintain and preserve the environmental resources at the WIPP site. DOE Order 231.1A; DOE Order 450.1, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This report was prepared in accordance with DOE Order 231.1A. This order requires that DOE facilities submit an ASER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) (No. NM4890139088-TSDF [treatment, storage, and disposal facility]) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

  18. On-site and off-site activities

    International Nuclear Information System (INIS)

    Martin, H.D.

    1986-01-01

    Design principles for NPP training programs. Effects of NPP contracts. Effects of domestic industrial activities. The role of international bodies. Requirements for on-site training. Training abroad, technical, financial and social aspects. Training center on-site, an evaluation. (orig.)

  19. AIR PERMIT COMPLIANCE FOR WASTE RETRIEVAL OEPRATIONS INVOLVING MULTI-UNIT EMISSIONS

    International Nuclear Information System (INIS)

    SIMMONS FM

    2007-01-01

    Since 1970, approximately 38,000 suspect-transuranic and transuranic waste containers have been placed in retrievable storage on the Hanford Site in the 200 Areas burial grounds. Hanford's Waste Retrieval Project is retrieving these buried containers and processing them for safe storage and disposition. Container retrieval activities require an air emissions permit to account for potential emissions of radionuclides. The air permit covers the excavation activities as well as activities associated with assaying containers and installing filters in the retrieved transuranic containers lacking proper venting devices. Fluor Hanford, Inc. is required to track radioactive emissions resulting from the retrieval activities. Air, soil, and debris media contribute to the emissions and enabling assumptions allow for calculation of emissions. Each of these activities is limited to an allowed annual emission (per calendar year) and .contributes to the overall total emissions allowed for waste retrieval operations. Tracking these emissions is required to ensure a permit exceedance does not occur. A tracking tool was developed to calculate potential emissions in real time sense. Logic evaluations are established within the tracking system to compare real time data against license limits to ensure values are not exceeded for either an individual activity or the total limit. Data input are based on field survey and workplace air monitoring activities. This tracking tool is used monthly and quarterly to verify compliance to the license limits. Use of this tool has allowed Fluor Hanford, Inc. to successfully retrieve a significant number of containers in a safe manner without any exceedance of emission limits

  20. Marketable pollution permits with uncertainty and transaction costs

    International Nuclear Information System (INIS)

    Montero, Juan-Pablo

    1998-01-01

    Increasing interest in the use of marketable permits for pollution control has become evident in recent years. Concern regarding their performance still remains because empirical evidence has shown transaction costs and uncertainty to be significant in past and existing marketable permits programs. In this paper we develop theoretical and numerical models that include transaction costs and uncertainty (in trade approval) to show their effects on market performance (i.e., equilibrium price of permits and trading volume) and aggregate control costs. We also show that in the presence of transaction costs and uncertainty the initial allocation of permits may not be neutral in terms of efficiency. Furthermore, using a numerical model for a hypothetical NO x trading program in which participants have discrete control technology choices, we find that aggregate control costs and the equilibrium price of permits are sensitive to the initial allocation of permits, even for constant marginal transaction costs and certainty

  1. Semi-analytical solution of flow to a well in an unconfined-fractured aquifer system separated by an aquitard

    Science.gov (United States)

    Sedghi, Mohammad M.; Samani, Nozar; Barry, D. A.

    2018-04-01

    Semi-analytical solutions are presented for flow to a well in an extensive homogeneous and anisotropic unconfined-fractured aquifer system separated by an aquitard. The pumping well is of infinitesimal radius and screened in either the overlying unconfined aquifer or the underlying fractured aquifer. An existing linearization method was used to determine the watertable drainage. The solution was obtained via Laplace and Hankel transforms, with results calculated by numerical inversion. The main findings are presented in the form of non-dimensional drawdown-time curves, as well as scaled sensitivity-dimensionless time curves. The new solution permits determination of the influence of fractures, matrix blocks and watertable drainage parameters on the aquifer drawdown. The effect of the aquitard on the drawdown response of the overlying unconfined aquifer and the underlying fractured aquifer was also explored. The results permit estimation of the unconfined and fractured aquifer hydraulic parameters via type-curve matching or coupling of the solution with a parameter estimation code. The solution can also be used to determine aquifer hydraulic properties from an optimal pumping test set up and duration.

  2. High-temperature extraction of rhenium from sulfuric acid solutions with trialkylamines

    International Nuclear Information System (INIS)

    Gladyhev, V.P.; Andreeva, N.N.; Kim, E.M.; Kovaleva, S.V.

    1985-01-01

    This paper attempts to determine the possibility of conducting high-temperature extraction of rhenium from sulfuric acid solutions with trialkylamines (TAA) using higher hydrocarbon-paraffin mixtures as the diluent of the extraction system. Substitution of kerosene by paraffin in the extraction system would permit decreasing the danger of fire and explosions during he extraction process. In extracting rhenium from industrial solutions with a melt of higher paraffins containing TAA and alcohols, the extraction system can be continously heated in heat exchangers through which washing sulfuric acid passes and then goes to the extractor. This permits utilizing the heat and decreases the temperature of the solutions for extraction to the optimum temperatures. Extraction of rhenium with a melt of trioctylamine in paraffin obeys the same mechanisms as high-temperature extraction of ruthenium (IV) by amines in kerosene and aromatic hydrocarbons

  3. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).

  4. Permissible state permit/fee systems for radioactive materials transportation

    International Nuclear Information System (INIS)

    Friel, L.

    1987-01-01

    Many state permit/fee systems for radioactive materials transportation have been ruled inconsistent with federal law invalidated by the courts. As the date for repository operation, and its associated transportation, draws near, more states can be expected to adopt permit/fee systems. Examination of the U.S. Department of Transportation's advisory rulings and federal court cases on previous permit/fee systems gives general guidance on the type of permit/fee systems most likely to withstand challenges. Such a system would: have a simplified permit application with minimal information requirements; address a federally-defined class of hazardous or radioactive materials; allow access to all shipments conducted in compliance with federal law; charge a fee reasonably related to the costs imposed on the state by the transportation; and minimize the potential for re-directing shipments to other jurisdictions

  5. 40 CFR 68.85 - Hot work permit.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  6. 76 FR 40338 - Marine Mammals; Photography Permit No. 16360

    Science.gov (United States)

    2011-07-08

    ... Mammals; Photography Permit No. 16360 AGENCY: National Marine Fisheries Service (NMFS), National Oceanic... photography of cetaceans off Hawaii. ADDRESSES: The permit and related documents are available for review upon... photography on 12 cetacean species had been submitted by the above-named applicant. The requested permit has...

  7. A Site-specific Study of In-building Wireless Solutions

    DEFF Research Database (Denmark)

    Liu, Zhen; Sørensen, Troels Bundgaard; wigard, jeroen

    2010-01-01

    on the same frequency as the macro cellular network. We look at the radio performance of each solution in a LTE downlink context with in-building path loss values retrieved from real-life measurements. The performance is compared by means of maximum supportable user numbers and average system throughput...

  8. Hanford Site National Environmental Policy Act (NEPA) Characterization

    Energy Technology Data Exchange (ETDEWEB)

    Cushing, C.E. (ed.)

    1992-12-01

    This fifth revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Information is presented on climate and meteorology, geology and hydrology, ecology, history and archaeology, socioeconomics, land use, and noise levels, prepared by Pacific Northwest Laboratory (PNL) staff. Models are described that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions. Federal and state regulations, DOE orders and permits, and environmental standards directly applicable for the NEPA documents at the Hanford Site, are provided.

  9. Hanford Site National Environmental Policy Act (NEPA) Characterization

    International Nuclear Information System (INIS)

    Cushing, C.E.

    1992-12-01

    This fifth revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Information is presented on climate and meteorology, geology and hydrology, ecology, history and archaeology, socioeconomics, land use, and noise levels, prepared by Pacific Northwest Laboratory (PNL) staff. Models are described that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions. Federal and state regulations, DOE orders and permits, and environmental standards directly applicable for the NEPA documents at the Hanford Site, are provided

  10. Pacific Islands Region Fishing Permits

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Sustainable Fisheries Division Permits Program issues around 300 permits annually for pelagic longline and troll & handline, bottomfish, crustacean (lobster...

  11. Hanford Central Waste Complex: Radioactive mixed waste storage facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Site is owned by the US Government and operated by the US Department of Energy Field Office, Richland. The Hanford Site manages and produces dangerous waste and mixed waste (containing both radioactive and dangerous components). The dangerous waste is regulated in accordance with the Resource Conversation and Recovery Act of 1976 and the State of Washington Hazardous Waste Management Act of 1976. The radioactive component of mixed waste is interpreted by the US Department of Energy to be regulated under the Atomic Energy Act of 1954; the nonradioactive dangerous component of mixed waste is interpreted to be regulated under the Resource Conservation and Recovery Act of 1976 and Washington Administrative Code 173--303. Westinghouse Hanford Company is a major contractor to the US Department of Energy Field Office, Richland and serves as co-operator of the Hanford Central Waste Complex. The Hanford Central Waste Complex is an existing and planned series of treatment, storage, and/or disposal units that will centralize the management of solid waste operations at a single location on the Hanford facility. The Hanford Central Waste Complex units include the Radioactive Mixed Waste Storage Facility, the unit addressed by this permit application, and the Waste Receiving and Processing Facility. The Waste Receiving and Processing Facility is covered in a separate permit application submittal

  12. 75 FR 3731 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging-Permit Number IDG-37-0000

    Science.gov (United States)

    2010-01-22

    ... System (NPDES) general permit to placer mining operations in Idaho for small suction dredges (intake... ENVIRONMENTAL PROTECTION AGENCY [FRL-9104-3] Proposed Issuance of a General NPDES Permit for Small... significant economic impact on a substantial number of small entities.'' EPA has concluded that NPDES general...

  13. New Site Coefficients and Site Classification System Used in Recent Building Seismic Code Provisions

    Science.gov (United States)

    Dobry, R.; Borcherdt, R.D.; Crouse, C.B.; Idriss, I.M.; Joyner, W.B.; Martin, G.R.; Power, M.S.; Rinne, E.E.; Seed, R.B.

    2000-01-01

    Recent code provisions for buildings and other structures (1994 and 1997 NEHRP Provisions, 1997 UBC) have adopted new site amplification factors and a new procedure for site classification. Two amplitude-dependent site amplification factors are specified: Fa for short periods and Fv for longer periods. Previous codes included only a long period factor S and did not provide for a short period amplification factor. The new site classification system is based on definitions of five site classes in terms of a representative average shear wave velocity to a depth of 30 m (V?? s). This definition permits sites to be classified unambiguously. When the shear wave velocity is not available, other soil properties such as standard penetration resistance or undrained shear strength can be used. The new site classes denoted by letters A - E, replace site classes in previous codes denoted by S1 - S4. Site classes A and B correspond to hard rock and rock, Site Class C corresponds to soft rock and very stiff / very dense soil, and Site Classes D and E correspond to stiff soil and soft soil. A sixth site class, F, is defined for soils requiring site-specific evaluations. Both Fa and Fv are functions of the site class, and also of the level of seismic hazard on rock, defined by parameters such as Aa and Av (1994 NEHRP Provisions), Ss and S1 (1997 NEHRP Provisions) or Z (1997 UBC). The values of Fa and Fv decrease as the seismic hazard on rock increases due to soil nonlinearity. The greatest impact of the new factors Fa and Fv as compared with the old S factors occurs in areas of low-to-medium seismic hazard. This paper summarizes the new site provisions, explains the basis for them, and discusses ongoing studies of site amplification in recent earthquakes that may influence future code developments.

  14. Data requirements for valuing externalities: The role of existing permitting processes

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.D.; Baechler, M.C.; Callaway, J.M.

    1990-08-01

    While the assessment of externalities, or residual impacts, will place new demands on regulators, utilities, and developers, existing processes already require certain data and information that may fulfill some of the data needs for externality valuation. This paper examines existing siting, permitting, and other processes and highlights similarities and differences between their data requirements and the data required to value environmental externalities. It specifically considers existing requirements for siting new electricity resources in Oregon and compares them with the information and data needed to value externalities for such resources. This paper also presents several observations about how states can take advantage of data acquired through processes already in place as they move into an era when externalities are considered in utility decision-making. It presents other observations on the similarities and differences between the data requirements under existing processes and those for valuing externalities. This paper also briefly discusses the special case of cumulative impacts. And it presents recommendations on what steps to take in future efforts to value externalities. 35 refs., 2 tabs.

  15. Demographic characteristics of nuclear installations sites

    International Nuclear Information System (INIS)

    Doumenc, A.; Faure, J.

    1988-01-01

    The selection of a nuclear installations sites can not be conceived without a deep analysis of demographic context. This analysis permits to define the critical populations around the installation and is an essential element of emergency plans. 1 tab., 2 refs. (F.M.)

  16. 40 CFR 70.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 70.5(d) of this part. (B) Prompt reporting of deviations from permit requirements, including those... corrective actions or preventive measures taken. The permitting authority shall define “prompt” in relation... and air pollution control equipment), practices, or operations regulated or required under the permit...

  17. Sociological perspective on the siting of hazardous waste facilities

    International Nuclear Information System (INIS)

    Mileti, D.S.; Williams, R.G.

    1985-01-01

    The siting of hazardous waste facilities has been, and will likely continue to be, both an important societal need and a publically controversial topic. Sites have been denounced, shamed, banned, and moved at the same time that the national need for their installation and use has grown. Despite available technologies and physical science capabilities, the effective siting of facilitites stands more as a major contemporary social issue than it is a technological problem. Traditional social impact assessment approaches to the siting process have largely failed to meaningfully contribute to successful project implementation; these efforts have largely ignored the public perception aspects of risk and hazard on the success or failure of facility siting. This paper proposes that the siting of hazardous waste facilities could well take advantage of two rich but somewhat disparate research histories in the social sciences. A convergent and integrated approach would result from the successful blending of social impact assessment, which seeks to define and mitigate problems, with an approach used in hazards policy studies, which has sought to understand and incorporate public risk perceptions into effective public decision-making. It is proposed in this paper that the integration of these two approaches is necessary for arriving at more readily acceptable solutions to siting hazardous waste facilities. This paper illustrates how this integration of approaches could be implemented

  18. Early Site Permit Demonstration Program: Guidelines for determining design basis ground motions

    International Nuclear Information System (INIS)

    1993-01-01

    This report develops and applies a methodology for estimating strong earthquake ground motion. The motivation was to develop a much needed tool for use in developing the seismic requirements for structural designs. An earthquake's ground motion is a function of the earthquake's magnitude, and the physical properties of the earth through which the seismic waves travel from the earthquake fault to the site of interest. The emphasis of this study is on ground motion estimation in Eastern North America (east of the Rocky Mountains), with particular emphasis on the Eastern United States and southeastern Canada. Eastern North America is a stable continental region, having sparse earthquake activity with rare occurrences of large earthquakes. While large earthquakes are of interest for assessing seismic hazard, little data exists from the region to empirically quantify their effects. Therefore, empirically based approaches that are used for other regions, such as Western North America, are not appropriate for Eastern North America. Moreover, recent advances in science and technology have now made it possible to combine theoretical and empirical methods to develop new procedures and models for estimating ground motion. The focus of the report is on the attributes of ground motion in Eastern North America that are of interest for the design of facilities such as nuclear power plants. Specifically considered are magnitudes M from 5 to 8, distances from 0 to 500 km, and frequencies from 1 to 35 Hz. This document, Volume IV, provides Appendix 8.B, Laboratory Investigations of Dynamic Properties of Reference Sites

  19. Hanford Site Air Operating Permit Application - Supplemental Information (Supplement 1, Volumes 1 thru 3)

    International Nuclear Information System (INIS)

    CURN, B.L.

    2000-01-01

    This report documents radionuclide air emissions from the Hanford Site in 1998 and the resulting effective dose equivalent to the maximally exposed individual (MEI) member of the public. The report has been prepared in accordance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (40 CFR 61), Subpart H: ''National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities,'' and with the Washington Administrative Code Chapter 246247, Radiation Protection - Air Emissions. The federal regulations in 40 CFR 61, Subpart H, require the measurement and reporting of radionuclides emitted from Department of Energy facilities and the resulting offsite dose from those emissions. A standard of 10 mrem/yr effective dose equivalent (EDE) is imposed on them. The EDE to the MEI due to routine emissions in 1998 from Hanford Site point sources was 1.3 E-02 mrem (1.3 E-04 mSv). which is 0.13 percent of the federal standard. Chapter 246-247 of the Washington Administrative Code (WAC) requires the reporting of radionuclide emissions from all Department of Energy Hanford Site sources. The state has adopted into these regulations the 40 CFR 61 standard of 10 mrem/yr EDE. The EDE to the MEI attributable to diffuse and fugitive radionuclide air emissions from the Hanford Site in 1998 was 2.5 E-02 mrem (2.S E-04 mSv). This dose added to the dose from point sources gives a total for all sources of 3.8 E-02 mrem/yr (3.8 E-04 mSv) EDE. which is 0.38 percent of the 10 mrem/yr standard. An unplanned release on August 26, 1998, in the 300 Area of the Hanford Site resulted in a potential dose of 4.1 E-02 mrem to a hypothetical individual at the nearest point of public access to that area. This hypothetical individual was not the MEI since the wind direction on the day of the release was away from the MEI residence. The potential dose from the unplanned event

  20. Group NPDES stormwater permit application: The Conoco experience

    International Nuclear Information System (INIS)

    Holler, J.D.

    1993-01-01

    The US Environmental Protection Agency (USEPA) has reported that stormwater runoff is a major cause of pollution and use impairment to waters of the nation. Diffuse pollution sources (stormwater runoff) are increasingly important as controls for industrial process dischargers. On November 16, 1990 the Federal Clean Water Act National Pollutant Discharge Elimination System (NPDES) rules governing the discharge of stormwater were published (56 FR 40948). These rules potentially affect every type of business enterprise conducting work ''associated with industrial activity.'' Dischargers of stormwater associated with industrial activity ar required to either seek coverage under a federal or state general permit using notice of intent, apply for an individual permit, or apply for a permit through a two-part group application process. Conoco, Inc. Supply and Transportation (S and T) elected the latter alternative to attempt to comply with these new evolving complex, broad-ranging permitting requirements. This paper discusses specific details of S and T's strategy, BMP designs, data acquisition activities, monitoring results, as well as economic impacts on the corporation as a result of storm water permit requirements. S and T operates approximately 170 unique wholly and jointly owned petroleum product storage and transport facilities across the nation. Approximately one-third of these facilities were subject to stormwater permit application requirements

  1. The Pacific Marine Energy Center - South Energy Test Site (PMEC-SETS)

    Energy Technology Data Exchange (ETDEWEB)

    Batten, Belinda [Oregon State Univ., Corvallis, OR (United States); Hellin, Dan [Oregon State Univ., Corvallis, OR (United States)

    2018-02-07

    The overall goal of this project was to build on existing progress to establish the Pacific Marine Energy Center South Energy Test Site (PMEC-SETS) as the nation's first fully permitted test site for wave energy converter arrays. Specifically, it plays an essential role in reducing levelized cost of energy for the wave energy industry by providing both the facility and resources to address the challenges of cost reduction.

  2. The Clean-Development Mechanism, stochastic permit prices and energy investments

    International Nuclear Information System (INIS)

    Hieronymi, Philipp; Schüller, David

    2015-01-01

    We analyze the impact on energy investments stemming from different emission permit classes, by considering permits that are allocated inside the European Emission Trading Scheme and secondary Certified Emission Reduction (sCER) permits originating from the Clean Development Mechanism. One price taking firm which is subject to emission regulation has the choice to invest in gas or wind power plant. The firm faces uncertainty regarding stochastically evolving permit prices, while it receives a premium on the electricity price for wind energy. As a first step, we determine the value of the option to invest into a gas power plant over time. Then, we calculate the investment probability of a gas power investment in a range of policy scenarios. We find that allowing the usage of sCER permits in the present policy framework has a positive impact on gas power investment. Decoupling the price processes has a similar effect. If the quota of sCER permits is doubled, the decrease in the investment probability for wind power is large. We carry out sensitivity tests for different parameter values, and find that investment behavior changes significantly with differing interest rates, the wind energy premium and volatility. - Highlights: • We model the impact of two CO 2 permit classes on energy investments. • We present a real-options framework accounting for uncertainty. • Clean Development Mechanism permits have a negative influence on investment into renewable energy. • Interest rate and volatility values have a strong impact on the results

  3. 7 CFR 319.75-3 - Permits.

    Science.gov (United States)

    2010-01-01

    ... Animal and Plant Health Inspection Service, Plant Protection and Quarantine, Port Operations, Permit Unit... article may be imported only after issuance of a written permit by Plant Protection and Quarantine. (b) An application for a written permit should be submitted to the Animal and Plant Health Inspection Service, Plant...

  4. Reducing data friction through site-based data curation

    Science.gov (United States)

    Thomer, A.; Palmer, C. L.

    2017-12-01

    Much of geoscience research takes place at "scientifically significant sites": localities which have attracted a critical mass of scientific interest, and thereby merit protection by government bodies, as well as the preservation of specimen and data collections and the development of site-specific permitting requirements for access to the site and its associated collections. However, many data standards and knowledge organization schemas do not adequately describe key characteristics of the sites, despite their centrality to research projects. Through work conducted as part of the IMLS-funded Site-Based Data Curation (SBDC) project, we developed a Minimum Information Framework (MIF) for site-based science, in which "information about a site's structure" is considered a core class of information. Here we present our empirically-derived information framework, as well as the methods used to create it. We believe these approaches will lead to the development of more effective data repositories and tools, and thereby will reduce "data friction" in interdisciplinary, yet site-based, geoscience workflows. The Minimum Information Framework for Site-based Research was developed through work at two scientifically significant sites: the hot springs at Yellowstone National Park, which are key to geobiology research; and the La Brea Tar Pits, an important paleontology locality in Southern California. We employed diverse methods of participatory engagement, in which key stakeholders at our sites (e.g. curators, collections managers, researchers, permit officers) were consulted through workshops, focus groups, interviews, action research methods, and collaborative information modeling and systems analysis. These participatory approaches were highly effective in fostering on-going partnership among a diverse team of domain scientists, information scientists, and software developers. The MIF developed in this work may be viewed as a "proto-standard" that can inform future

  5. Vessel Permit System Data Set

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — GARFO issues federal fishing permits annually to owners of fishing vessels who fish in the Greater Atlantic region, as required by federal regulation. These permits...

  6. Oskarshamn site investigation. Programme for further investigations of bedrock, soil, water and environment in Laxemar subarea

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-03-15

    investigation in Oskarshamn is planned to be made in the spring of 2006 when preliminary safety reports have been presented for both Simpevarp and Laxemar. If the decision should then be that the Simpevarp subarea is chosen, a new investigation programme and a new timetable will be prepared. The overall goal of the site investigation phase is to obtain the permits required to site and build the final repository. The site investigations must therefore provide the data required for an evaluation of the suitability of the investigated sites for a final repository. The material must accordingly be comprehensive enough to: Show whether the selected site satisfies fundamental safety requirements. Show whether the construction-related prerequisites are met. Permit the final repository to be adapted to the conditions and features on the site. Permit an assessment of the impact of the final repository on the environment and society. Permit comparisons between the two investigated sites - Forsmark and Simpevarp/Laxemar. According to SKB's plans, the site investigation in Oskarshamn will be concluded in the late summer of 2007. Monitoring will continue after this time. A large-scale interference test, combined with tracer tests, is also planned.

  7. Restoring of offshore wind farm sites. Lillgrund Pilot Project; Aaterstaellande av havsbaserad vindkraft. Lillgrund Pilot Projekt

    Energy Technology Data Exchange (ETDEWEB)

    Stumle Wikander, Jhenny (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    This report focuses on the legal aspects of decommissioning and restoring of offshore wind farm sites, as part of an extensive report on the Lillgrund Offshore Wind Farm Pilot Project. For this analysis, all permit conditions of the granted permits for the offshore wind parks in Sweden have been collected and studied. According to the Swedish Environmental code 'the validity of a permit, approval or exemption may be made subject to the requirement that the person who intends to pursue the activity must furnish a security for the costs of after-treatment and any other restoration measures that may be necessary as a result. The state, municipalities, county councils and associations of municipalities shall not be required to furnish a security. If there is cause to assume that the security furnished is no longer sufficient, the authority which is considering the application for a permit, approval or exemption may require an additional security to be furnished'. The permits show that different types of securities are being used, with bank warranties and securities being the most common. Securities are either fixed and furnished prior to start of construction or start of operations, or they are obtained gradually over the life of the project. Among the twelve permits studied, a gradual tendency to use a combination of the two alternatives can bee seen. The conditions governing when an offshore wind farm is to be discontinued and which parts need to be partly or fully removed from the site are obviously of future importance. The issue has been addressed to different degrees in the permits, some to a clear legal extent, while others are more general. The Lillgrund Offshore Wind Farm was secured for 60 million SEK. The extent to which the park is to be decommissioned and the site to be restored is decided by the county administrative board once production is terminated

  8. 75 FR 51845 - Chrysler Group, LLC Manufacturing Division St. Louis North Plant Including On-Site Leased Workers...

    Science.gov (United States)

    2010-08-23

    ... produce performance coating solutions for vehicles. The company reports that workers leased from DuPont Performance Coatings, a wholly-owned subsidiary of E.I. DuPont de Nemours Company, OEM, were employed on-site..., C R Associates, Syncreon, Robinson Solutions and Dupont Performance Coatings Fenton, MO; Amended...

  9. SSC [Superconducting Super Collider] site evaluations

    International Nuclear Information System (INIS)

    1988-11-01

    With this report, the SSC Site Task Force forwards to the Director, Office of Energy Research, US Department of Energy (DOE), its evaluation of the technical criteria and life-cycle costs for the proposed SSC sites judged to be the best qualified. The criteria against which each site was evaluated are those set forth in the Invitation for Site Proposals for the Superconducting Super Collider (DOE/ER-0315) (Invitation) which was prepared by the Task Force and issued in April 1987. The methodology followed by the Task Force in this report and in all other phases of the proposal evaluation has been consistent with the SSC site selection process approved by DOE's Energy System Acquisition Advisory Board (ESAAB). The goal of the site selection process is to identify a site that will permit the highest level of research productivity and overall effectiveness of the SSC at a reasonable cost of construction and operation and with minimial impact on the environment. The Task Force acknowledges that all seven sites are, indeed, highly qualified locations for the construction and operation of the SSC on the basis of technical and cost considerations. In performing its evaluation, which is presented in this paper, the Task Force took an in-depth look at each site on the basis of site visits and extensive technical analyses. A consensus rating for each technical evaluation criterion and subcriterion was developed for each site

  10. Water and Solute Mass Transport in Soils Developed on glacial Drift: A Br Tracer Investigation Using Instrumented Soil Monoliths at an Agricultural Long Term Ecological Research Site (Kellogg Biological Station, Hickory Corners, Southern Michigan)

    Science.gov (United States)

    Jin, L.; Hamilton, S. K.; Walter, L. M.

    2004-12-01

    Hydrologic processes control the residence time of water in the soil column. This is of central importance in understanding mineral weathering rates in terms of reaction kinetics and solute transport. In order to better quantify the coupling between water and solute mass transport and to better define controls on carbonate and aluminosilicates weathering rates, we have conducted bromide-tracer introduction experiments at four replicate soil monoliths (4 m3 volume) instrumented and managed by the KBS-LTER. Monolith soils are developed on the pitted outwash plain of the morainic system left by the last retreat of the Wisconsin glaciation, around 12,000 years ago. Soil profiles from the monolith sections extend to 200 cm and they were sampled and characterized texturally and mineralogically. Quartz and feldspar are dominant throughout the soil profile, while carbonates and hornblende occur only in deeper soil horizons. The four replicate monoliths are instrumented with gas and soil water sampling devices (Prenart tension lysimeters) at various depths. The monoliths also have a large capacity tray at the bottom, which permits collection of water for weight and chemical determinations. A bromide tracer solution (as lithium bromide) was applied to coincide as closely as possible with a major snowmelt event (2/27/04). The saturated and unsaturated transport of bromide through the four monoliths was followed as a function of time and soil profile depth for the duration of the snowmelt as well as intermittent rain events. Because the soil was saturated at the time of bromide application, the bromide solution is expected to move rapidly through macropores, followed by slower movement into micropores. The unsaturated transport of bromide is largely controlled by the intensity and duration of the rains if it is dominated by piston flow as opposed to preferential channel flow. In general, the tracer moved through the shallow soils very quickly, which is shown by early sharp

  11. Periodic travelling and non-travelling wave solutions of the nonlinear Klein-Gordon equation with imaginary mass

    International Nuclear Information System (INIS)

    Tang Xiaoyan; Shukla, Padma Kant

    2008-01-01

    Exact solutions, including the periodic travelling and non-travelling wave solutions, are presented for the nonlinear Klein-Gordon equation with imaginary mass. Some arbitrary functions are permitted in the periodic non-travelling wave solutions, which contribute to various high dimensional nonlinear structures

  12. Lean in Air Permitting Guide

    Science.gov (United States)

    The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.

  13. Permitting a biomass-fired power plant in California -- A case study

    International Nuclear Information System (INIS)

    Reisman, J.I.; Needham, G.A.

    1995-01-01

    This paper describes the process of preparing an air permit application for a proposed biomass-fired power plant. The plant is designed to produce a net electric power output of 16 megawatts (MW) for sale to Pacific Gas and Electric Company. The biomass fuel will consist of urban wood waste, construction wood waste, and waste from agricultural products, such as tree prunings and fruit pits. The site is located in an industrial park in Soledad, California

  14. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site's contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b)

  15. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Science.gov (United States)

    2010-07-01

    ... WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.62 Hazardous waste incinerator permits. When an owner or operator of a hazardous waste... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Hazardous waste incinerator permits...

  16. Siting-selection study for the Soyland Power Cooperative, Inc. , compressed-air energy-storage system (CAES)

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    A method used for siting a compressed air energy storage (CAES) system using geotechnical and environmental criteria is explained using the siting of a proposed 220 MW water-compensated CAES plant in Illinois as an example. Information is included on the identification and comparative ranking of 28 geotechnically and environmental sites in Illinois, the examination of fatal flaws, e.g., mitigation, intensive studies, costly studies, permit denials, at 7 sites; and the selection of 3 sites for further geological surveying. (LCL)

  17. Factors Influencing Learner Permit Duration

    Directory of Open Access Journals (Sweden)

    Johnathon P. Ehsani

    2016-12-01

    Full Text Available An increasing number of countries are requiring an extended learner permit prior to independent driving. The question of when drivers begin the learner permit period, and how long they hold the permit before advancing to independent licensure has received little research attention. Licensure timing is likely to be related to “push” and “pull” factors which may encourage or inhibit the process. To examine this question, we recruited a sample of 90 novice drivers (49 females and 41 males, average age of 15.6 years soon after they obtained a learner permit and instrumented their vehicles to collect a range of driving data. Participants completed a series of surveys at recruitment related to factors that may influence licensure timing. Two distinct findings emerged from the time-to-event analysis that tested these push and pull factors in relation to licensure timing. The first can be conceptualized as teens’ motivation to drive (push, reflected in a younger age when obtaining a learner permit and extensive pre-permit driving experience. The second finding was teens’ perceptions of their parents’ knowledge of their activities (pull; a proxy for a parents’ attentiveness to their teens’ lives. Teens who reported higher levels of their parents’ knowledge of their activities took longer to advance to independent driving. These findings suggest time-to-licensure may be related to teens’ internal motivation to drive, and the ability of parents to facilitate or impede early licensure.

  18. State waste discharge permit application: 200 Area Treated Effluent Disposal Facility (Project W-049H)

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    As part of the original Hanford Federal Facility Agreement and Concent Order negotiations, US DOE, US EPA and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground to the Hanford Site are subject to permitting in the State Waste Discharge Permit Program (SWDP). This document constitutes the SWDP Application for the 200 Area TEDF stream which includes the following streams discharged into the area: Plutonium Finishing Plant waste water; 222-S laboratory Complex waste water; T Plant waste water; 284-W Power Plant waste water; PUREX chemical Sewer; B Plant chemical sewer, process condensate, steam condensate; 242-A-81 Water Services waste water.

  19. State waste discharge permit application: 200 Area Treated Effluent Disposal Facility (Project W-049H)

    International Nuclear Information System (INIS)

    1994-08-01

    As part of the original Hanford Federal Facility Agreement and Concent Order negotiations, US DOE, US EPA and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground to the Hanford Site are subject to permitting in the State Waste Discharge Permit Program (SWDP). This document constitutes the SWDP Application for the 200 Area TEDF stream which includes the following streams discharged into the area: Plutonium Finishing Plant waste water; 222-S laboratory Complex waste water; T Plant waste water; 284-W Power Plant waste water; PUREX chemical Sewer; B Plant chemical sewer, process condensate, steam condensate; 242-A-81 Water Services waste water

  20. Storm water permitting for oil and gas facilities

    International Nuclear Information System (INIS)

    de Blanc, P.C.

    1991-01-01

    After several false starts, the US Environmental Protection Agency (EPA) published new federal storm water regulations in the November 16, 1990 Federal Register. These regulations identify facilities which must apply for a storm water permit and detail permit application requirements. The regulations appear at 40 CFR 122 Subpart B and became effective December 17, 1990. An outline of these regulations and their applicability to oil and gas facilities is presented. They are: facilities which require a storm water permit; types of storm water permits; permit application deadlines; permit application forms; facilities with existing storm water permits; storm water permit application data requirements; storm water sampling and analysis requirements; and EPA contacts for additional information

  1. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  2. Presentation of safety after closure of the repository for spent nuclear fuel. Main report of the project SR-Site. Part I; Redovisning av saekerhet efter foerslutning av slutfoervaret foer anvaent kaernbraensle. Huvudrapport fraan projekt SR-Site. Del I

    Energy Technology Data Exchange (ETDEWEB)

    2011-07-01

    The purpose of the safety assessment SR-Site is to investigate whether a safe repository for spent nuclear fuel by KBS-3 type can be constructed at Forsmark in Oesthammar in Sweden. The location of the Forsmark has been selected based on results of several surveys from surface conditions at depth in Forsmark and in Laxemar in Oskarshamn. The choice of location is not justified in SR-Site Report, but in other attachments to SKB's permit applications. SR-Site Report is an important part of SKB's permit applications to construct and operate a repository for spent nuclear fuel at Forsmark in Oesthammar. The purpose of the report in the applications is to show that a repository at Forsmark is safe after closure

  3. Presentation of safety after closure of the repository for spent nuclear fuel. Main report of the project SR-Site. Part II; Redovisning av saekerhet efter foerslutning av slutfoervaret foer anvaent kaernbraensle. Huvudrapport fraan projekt SR-Site. Del II

    Energy Technology Data Exchange (ETDEWEB)

    2011-07-01

    The purpose of the safety assessment SR-Site is to investigate whether a safe repository for spent nuclear fuel by KBS-3 type can be constructed at Forsmark in Oesthammar in Sweden. The location of the Forsmark has been selected based on results of several surveys from surface conditions at depth in Forsmark and in Laxemar in Oskarshamn. The choice of location is not justified in SR-Site Report, but in other attachments to SKB's permit applications. SR-Site Report is an important part of SKB's permit applications to construct and operate a repository for spent nuclear fuel at Forsmark in Oesthammar. The purpose of the report in the applications is to show that a repository at Forsmark is safe after closure

  4. Presentation of safety after closure of the repository for spent nuclear fuel. Main report of the project SR-Site. Part III; Redovisning av saekerhet efter foerslutning av slutfoervaret foer anvaent kaernbraensle. Huvudrapport fraan projekt SR-Site. Del III

    Energy Technology Data Exchange (ETDEWEB)

    2011-07-01

    The purpose of the safety assessment SR-Site is to investigate whether a safe repository for spent nuclear fuel by KBS-3 type can be constructed at Forsmark in Oesthammar in Sweden. The location of the Forsmark has been selected based on results of several surveys from surface conditions at depth in Forsmark and in Laxemar in Oskarshamn. The choice of location is not justified in SR-Site Report, but in other attachments to SKB's permit applications. SR-Site Report is an important part of SKB's permit applications to construct and operate a repository for spent nuclear fuel at Forsmark in Oesthammar. The purpose of the report in the applications is to show that a repository at Forsmark is safe after closure

  5. Effect of zero discharge permits on oil and gas operations

    International Nuclear Information System (INIS)

    Higdon, G.D.

    1994-01-01

    This paper examines one of the more prominent effects of the Clean Water Act (CWA) upon oil and gas operations. To that end, the paper begins with a general discussion of the regulatory background and permitting framework which serves as the foundation for water pollution control. From this discussion, the paper will then move into a discussion of particular permit provisions which govern the discharge of wastes generated from oil and gas operations. Upon discussing these provisions, the paper will then discuss potential enforcement options available to the Environmental Protection Agency (EPA) to address violations of the regulations and permits it has issued to implement the CWA. In that regard, the paper will also discuss some recent enforcement theories advocated by the EPA which may have significant impacts upon oil and gas operators and the way in which they conduct their operations. In light of some of these recent enforcement activities, the paper will close with a discussion of the implications of the theories of liability espoused by EPA and steps which oil and gas operators may taking in response to the positions assumed by EPA

  6. 77 FR 29450 - Actions on Special Permit Applications

    Science.gov (United States)

    2012-05-17

    ............ Conference of 49 CFR To modify the Radiation 172.203(d); special permit add Control Part 172, 49 CFR Part 172..., KY. the list of regulations exempted in paragraph 4. 11406-M......... Conference of 49 CFR Part To... mode of Berlin 173.345; transportation Packaging 173.346; (cargo vessel.) (Former 173.359; Grantee All...

  7. CERCLA site assessment workbook

    International Nuclear Information System (INIS)

    1994-08-01

    This contains comments for each chapter of exercises (in Vol. 1) which illustrate how to conduct site assessments for CERCLA regulation. A through analysis of the exercises is provided so that work and solutions from Vol 1 can be critiqued and comments are also included on the strategy of site assessment whereas the exercises illustrate the principles involved. Covered exercises include the following: A preliminary assessment of a ground water site; waste characteristics and characterization of sources; documentation of observed releases and actual contamination of targets; the strategy of an SI at a surface water site; the soil exposure pathway; the air pathway

  8. Early Site Permit Demonstration Program: Guidelines for determining design basis ground motions. Volume 2, Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-18

    This report develops and applies a methodology for estimating strong earthquake ground motion. The motivation was to develop a much needed tool for use in developing the seismic requirements for structural designs. An earthquake`s ground motion is a function of the earthquake`s magnitude, and the physical properties of the earth through which the seismic waves travel from the earthquake fault to the site of interest. The emphasis of this study is on ground motion estimation in Eastern North America (east of the Rocky Mountains), with particular emphasis on the Eastern United States and southeastern Canada. Eastern North America is a stable continental region, having sparse earthquake activity with rare occurrences of large earthquakes. While large earthquakes are of interest for assessing seismic hazard, little data exists from the region to empirically quantify their effects. The focus of the report is on the attributes of ground motion in Eastern North America that are of interest for the design of facilities such as nuclear power plants. This document, Volume II, contains Appendices 2, 3, 5, 6, and 7 covering the following topics: Eastern North American Empirical Ground Motion Data; Examination of Variance of Seismographic Network Data; Soil Amplification and Vertical-to-Horizontal Ratios from Analysis of Strong Motion Data From Active Tectonic Regions; Revision and Calibration of Ou and Herrmann Method; Generalized Ray Procedure for Modeling Ground Motion Attenuation; Crustal Models for Velocity Regionalization; Depth Distribution Models; Development of Generic Site Effects Model; Validation and Comparison of One-Dimensional Site Response Methodologies; Plots of Amplification Factors; Assessment of Coupling Between Vertical & Horizontal Motions in Nonlinear Site Response Analysis; and Modeling of Dynamic Soil Properties.

  9. 21 CFR 108.12 - Manufacturing, processing, or packing without a permit, or in violation of a permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Manufacturing, processing, or packing without a permit, or in violation of a permit. 108.12 Section 108.12 Food and Drugs FOOD AND DRUG ADMINISTRATION... General Provisions § 108.12 Manufacturing, processing, or packing without a permit, or in violation of a...

  10. 40 CFR 60.4124 - Hg budget permit revisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit revisions. 60.4124... Coal-Fired Electric Steam Generating Units Permits § 60.4124 Hg budget permit revisions. Except as provided in § 60.4123(b), the permitting authority will revise the Hg Budget permit, as necessary, in...

  11. Application of On-Site Wastewater Treatment in Ireland and Perspectives on Its Sustainability

    Directory of Open Access Journals (Sweden)

    Donata Dubber

    2014-03-01

    Full Text Available The wastewater of one third of Ireland’s population is treated on-site using domestic treatment systems (DWWTSs that usually consist of a septic tank and soil attenuation system. Within the past four years, the legislative framework for these systems has undergone a major change with a registration and inspection regime being introduced to identify legacy sites that will require remediation work, particularly in areas of the country underlain by subsoils of very low permeability. Against this background this study aims to assess the overall sustainability of existing DWWTSs as well as alternative treatment and disposal options. The results show that main CO2eq emissions are from the methane production in septic tanks. The reduced methane production in mechanically aerated secondary treatment systems was found to counterbalance the related emissions due to the additional energy requirements. In contrast, septic tank systems have the lowest construction and operational costs representing the most economically sustainable solution. Pressurised disposal systems are slightly more expensive but have the potential to reduce environmental impact on surface water and reduce greenhouse gas emissions. Clustered decentralised treatment solutions could be environmentally and economically sustainable but ownership, management and related financial and legal issues will need to be addressed and developed.

  12. Essays on the comparison of climate change policies: Land use regulations, taxes, and tradable permits

    Science.gov (United States)

    Heres Del Valle, David R.

    The California Global Warming Solutions Act of 2006 requires year 2020 greenhouse gas (GHG) emissions in the state to be reduced back to 1990 levels. Several mitigation strategies have been explored and are expected to be implemented over the next few years. Among others, land use policies have been advocated as an important means to curb GHG emissions through the reduction of vehicle miles traveled (VMT), while an economy-wide cap and trade system would ensure that a certain level of GHG reductions is achieved although at unknown costs. The first essay of this dissertation aims to contribute to the ongoing discussion over the impact of land use policies by implementing a modified two-part model (M2PM) with instrumental variables (IV), a procedure that respectively takes into account the large mass of observations with zero car travel, and the possibility of residential self-selection, both of which could otherwise bias the estimates. The analysis takes advantage of a large dataset on travel patterns and socio-economic characteristics of more than 7,000 households across the 58 counties in the state of California. Results show that although VMT elasticities with respect to residential density are larger than others found in the recent econometric literature, the actual impact of residential density on VMT would not be as large unless very large increases in residential density occur. On the other hand, recent estimates of the elasticity of VMT with respect to the price of gasoline imply that moderate increases in the price of gasoline would suffice to reduce travel by similar magnitudes. The second essay reconsiders the debate over quantity (e.g., tradable permits) and price (e.g., taxes) controls by introducing uncertainty in the damage from the externality under a controlled environment. Economic theory predicts that quantity and price instruments for the control of externalities will produce identical outcomes as long as certain conditions obtain - namely

  13. Site Study Plan for laboratory soil mechanics, Deaf Smith County site, Texas: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    This Site Study Plan for laboratory soil mechanics describes the laboratory testing to be conducted on soil samples collected as part of the characterization of the Deaf Smith County site, Texas. This study provides for measurements of index, mechanical, thermal, hydrologic, chemical, and mineral properties of soils from boring throughout the site. Samples will be taken from Playa Borings/Trenching, Transportation/Utilities Foundation Borings, Repository Surface Facilities Design Foundation Borings, and Exploratory Shaft Facilities Design Foundation Borings. Data from the laboratory tests will be used for soil strata characterization, design of foundations for surface structures, design of transportation facilities and utility structures, design of impoundments, design of shaft lining, design of the shaft freeze wall, shaft permitting, performance assessment calculations, and other program requirements. A tentative testing schedule and milestone log are given. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 18 refs., 6 figs., 3 tabs

  14. 30 CFR 773.10 - Review of permit history.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  15. Charge-regulation phase transition on surface lattices of titratable sites adjacent to electrolyte solutions: An analog of the Ising antiferromagnet in a magnetic field

    Science.gov (United States)

    Shore, Joel D.; Thurston, George M.

    2018-01-01

    We report a charge-patterning phase transition on two-dimensional square lattices of titratable sites, here regarded as protonation sites, placed in a low-dielectric medium just below the planar interface between this medium and a salt solution. We calculate the work-of-charging matrix of the lattice with use of a linear Debye-Hückel model, as input to a grand-canonical partition function for the distribution of occupancy patterns. For a large range of parameter values, this model exhibits an approximate inverse cubic power-law decrease of the voltage produced by an individual charge, as a function of its in-lattice separation from neighboring titratable sites. Thus, the charge coupling voltage biases the local probabilities of proton binding as a function of the occupancy of sites for many neighbors beyond the nearest ones. We find that even in the presence of these longer-range interactions, the site couplings give rise to a phase transition in which the site occupancies exhibit an alternating, checkerboard pattern that is an analog of antiferromagnetic ordering. The overall strength W of this canonical charge coupling voltage, per unit charge, is a function of the Debye length, the charge depth, the Bjerrum length, and the dielectric coefficients of the medium and the solvent. The alternating occupancy transition occurs above a curve of thermodynamic critical points in the (pH-pK,W) plane, the curve representing a charge-regulation analog of variation of the Néel temperature of an Ising antiferromagnet as a function of an applied, uniform magnetic field. The analog of a uniform magnetic field in the antiferromagnet problem is a combination of pH-pK and W, and 1/W is the analog of the temperature in the antiferromagnet problem. We use Monte Carlo simulations to study the occupancy patterns of the titratable sites, including interactions out to the 37th nearest-neighbor category (a distance of 74 lattice constants), first validating simulations through

  16. A review on regional convection permitting climate modeling

    Science.gov (United States)

    van Lipzig, Nicole; Prein, Andreas; Brisson, Erwan; Van Weverberg, Kwinten; Demuzere, Matthias; Saeed, Sajjad; Stengel, Martin

    2016-04-01

    With the increase of computational resources, it has recently become possible to perform climate model integrations where at least part the of convection is resolved. Since convection-permitting models (CPMs) are performing better than models where convection is parameterized, especially for high-impact weather like extreme precipitation, there is currently strong scientific progress in this research domain (Prein et al., 2015). Another advantage of CPMs, that have a horizontal grid spacing climate model COSMO-CLM is frequently applied for CPM simulations, due to its non-hydrostatic dynamics and open international network of scientists. This presentation consists of an overview of the recent progress in CPM, with a focus on COSMO-CLM. It consists of three parts, namely the discussion of i) critical components of CPM, ii) the added value of CPM in the present-day climate and iii) the difference in climate sensitivity in CPM compared to coarser scale models. In terms of added value, the CPMs especially improve the representation of precipitation's, diurnal cycle, intensity and spatial distribution. However, an in depth-evaluation of cloud properties with CCLM over Belgium indicates a strong underestimation of the cloud fraction, causing an overestimation of high temperature extremes (Brisson et al., 2016). In terms of climate sensitivity, the CPMs indicate a stronger increase in flash floods, changes in hail storm characteristics, and reductions in the snowpack over mountains compared to coarser scale models. In conclusion, CPMs are a very promising tool for future climate research. However, additional efforts are necessary to overcome remaining deficiencies, like improving the cloud characteristics. This will be a challenging task due to compensating deficiencies that currently exist in `state-of-the-art' models, yielding a good representation of average climate conditions. In the light of using CPMs to study climate change it is necessary that these deficiencies

  17. Options for clean-up of the Maralinga test site

    International Nuclear Information System (INIS)

    1985-06-01

    This report examines the limit of contamination of the soil and ground cover by 239 Pu, 235 U and 241 Am which may be considered as permitting the unrestricted land use of the former nuclear weapon test sites at Emu and Maralinga by Aboriginal groups. It reports on the options available to achieve this objective and their cost

  18. The clean development mechanism versus international permit trading: The effect on technological change

    International Nuclear Information System (INIS)

    Hagem, Cathrine

    2009-01-01

    The clean development mechanism of the Kyoto Protocol may induce technological change in developing countries. As an alternative to the clean development mechanism regime, developing countries may accept a (generous) cap on their own emissions, allow domestic producers to invest in new efficient technologies, and sell the excess emission permits on the international permit market. The purpose of this article is to show how the gains from investment, and hence the incentive to invest in new technology in developing countries, differ between the two alternative regimes. We show that the difference in the gains from investment depends on whether the producers in developing countries face competitive or noncompetitive output markets, whether the investment affects fixed or variable production costs, and whether producers can reduce emissions through means other than investing in new technology. (author)

  19. Wired well sites: future of data acquisition based on open architecture

    Energy Technology Data Exchange (ETDEWEB)

    Marsters, S.

    1999-10-01

    Up to recent times, there have been two primary ways to access process information such as flow volumes, pressure, temperature, surface cards, on/off status, fluid levels, torque/rpm and location, from remote sites. One way was to drive or helicopter to the site and retrieve the data. The other method was using SCADA, a data acquisition system composed of a remote terminal unit (RTU) to measure data at the site, a communication system to relay the data from the site to a central location, and a host computer system at the central site to receive and display the data brought in by the communication system. This paper is devoted to the examination of several of the communication systems, such as cellular digital packet data modems, low earth orbiting satellite systems and geosynchronous satellite systems, and devices that permit communication with remote host computer systems, such as processor assisted connectors (PAC) and the Intersat-developed global data network (GDN). With these proprietary devices in place, companies have the freedom to select virtually any type of communications system and combine it with virtually any type of output device to serve as the host computer. The GDN can automatically recognize the type of data transmitted, the source, the destination, and whether the information is scheduled or unscheduled, and raise an alarm in the case unscheduled messages to initiate immediate response. A second level of Intersat service (IP ANYWHERE) includes the capability for customers to check a well's status at any time they wish, to alter flow volume, or turn a valve on or off. The potential for IP ANYWHERE is estimated to be excellent, especially in difficult-to-access remote locations. 2 photos.

  20. Quantifying siting difficulty: a case study of US transmission line siting

    Energy Technology Data Exchange (ETDEWEB)

    Vajjhala, S.P. [Resources for the Future, Washington DC (United States); Fischbeck, P.S. [Carnegie Mellon University, Pittsburgh, PA (United States). Departments of Social and Decision Sciences and Engineering and Public Policy

    2007-01-15

    The worldwide demand for new energy infrastructures has been paralleled in recent years by the increasing difficulty of siting major facilities. Siting difficulty is the subject of widespread discussion, but because of the complexity of the problem, potential solutions are not obvious or well understood. This paper presents a two-step policy-level framework that first develops an empirical measure of siting difficulty and then qualitatively assesses its major causes. The approach is based on the creation and aggregation of four siting indicators that are independent of the common causes and localized effects of siting problems. The proposed framework is demonstrated for the case of US transmission line siting. Results of the analyses reveal significant variations in state siting difficulty and industry experts' perceptions of its dominant causes, with implications for the long-term success of Regional Transmission Organizations (RTOs) and knowledge transfer among siting professionals in the deregulated industry. (author)

  1. Reference interaction site model with hydrophobicity induced density inhomogeneity: An analytical theory to compute solvation properties of large hydrophobic solutes in the mixture of polyatomic solvent molecules

    International Nuclear Information System (INIS)

    Cao, Siqin; Sheong, Fu Kit; Huang, Xuhui

    2015-01-01

    Reference interaction site model (RISM) has recently become a popular approach in the study of thermodynamical and structural properties of the solvent around macromolecules. On the other hand, it was widely suggested that there exists water density depletion around large hydrophobic solutes (>1 nm), and this may pose a great challenge to the RISM theory. In this paper, we develop a new analytical theory, the Reference Interaction Site Model with Hydrophobicity induced density Inhomogeneity (RISM-HI), to compute solvent radial distribution function (RDF) around large hydrophobic solute in water as well as its mixture with other polyatomic organic solvents. To achieve this, we have explicitly considered the density inhomogeneity at the solute-solvent interface using the framework of the Yvon-Born-Green hierarchy, and the RISM theory is used to obtain the solute-solvent pair correlation. In order to efficiently solve the relevant equations while maintaining reasonable accuracy, we have also developed a new closure called the D2 closure. With this new theory, the solvent RDFs around a large hydrophobic particle in water and different water-acetonitrile mixtures could be computed, which agree well with the results of the molecular dynamics simulations. Furthermore, we show that our RISM-HI theory can also efficiently compute the solvation free energy of solute with a wide range of hydrophobicity in various water-acetonitrile solvent mixtures with a reasonable accuracy. We anticipate that our theory could be widely applied to compute the thermodynamic and structural properties for the solvation of hydrophobic solute

  2. Conceptual Design Report: Nevada Test Site Mixed Waste Disposal Facility Project

    International Nuclear Information System (INIS)

    2009-01-01

    Environmental cleanup of contaminated nuclear weapons manufacturing and test sites generates radioactive waste that must be disposed. Site cleanup activities throughout the U.S. Department of Energy (DOE) complex are projected to continue through 2050. Some of this waste is mixed waste (MW), containing both hazardous and radioactive components. In addition, there is a need for MW disposal from other mission activities. The Waste Management Programmatic Environmental Impact Statement Record of Decision designates the Nevada Test Site (NTS) as a regional MW disposal site. The NTS has a facility that is permitted to dispose of onsite- and offsite-generated MW until November 30, 2010. There is not a DOE waste management facility that is currently permitted to dispose of offsite-generated MW after 2010, jeopardizing the DOE environmental cleanup mission and other MW-generating mission-related activities. A mission needs document (CD-0) has been prepared for a newly permitted MW disposal facility at the NTS that would provide the needed capability to support DOE's environmental cleanup mission and other MW-generating mission-related activities. This report presents a conceptual engineering design for a MW facility that is fully compliant with Resource Conservation and Recovery Act (RCRA) and DOE O 435.1, 'Radioactive Waste Management'. The facility, which will be located within the Area 5 Radioactive Waste Management Site (RWMS) at the NTS, will provide an approximately 20,000-cubic yard waste disposal capacity. The facility will be licensed by the Nevada Division of Environmental Protection (NDEP)

  3. Quattor: managing (complex) grid sites

    International Nuclear Information System (INIS)

    Jouvin, M

    2008-01-01

    Quattor is a tool developed to efficiently manage fabrics with hundreds or thousands of Linux machines, while still being able to manage smaller clusters easily. It was originally developed inside the European Data Grid (EDG) project and is now in use at more than 50 grid sites running gLite middleware, ranging from small LCG T3s to very large sites like CERN. Quattor's ability to factorize and to reuse common parts of service configurations permitted the development of the QWG templates: a complete set of standard templates to configure the OS and gLite middleware. Any site can just import and customize the configuration without editing the bulk of the templates. Collaboration around these templates results in a very efficient sharing of installation and configuration information between those sites using them

  4. Periodic, complexiton solutions and stability for a (2+1)-dimensional variable-coefficient Gross-Pitaevskii equation in the Bose-Einstein condensation

    Science.gov (United States)

    Yin, Hui-Min; Tian, Bo; Zhao, Xin-Chao

    2018-06-01

    This paper presents an investigation of a (2 + 1)-dimensional variable-coefficient Gross-Pitaevskii equation in the Bose-Einstein condensation. Periodic and complexiton solutions are obtained. Solitons solutions are also gotten through the periodic solutions. Numerical solutions via the split step method are stable. Effects of the weak and strong modulation instability on the solitons are shown: the weak modulation instability permits an observable soliton, and the strong one overwhelms its development.

  5. Cystic fibrosis on the Internet: a survey of site adherence to AMA guidelines.

    Science.gov (United States)

    Anselmo, Mark A; Lash, Katherine M; Stieb, Elisabeth S; Haver, Kenan E

    2004-07-01

    The Internet permits unprecedented and mostly unrestricted access to medical knowledge; however, concerns exist regarding viewer privacy, accountability of authorship, accuracy of information, and patient safety. To address these issues, the American Medical Association (AMA) has developed guidelines concerning web site content and visitor rights. Cystic fibrosis (CF) is the most common genetically inherited lethal disease in North America. Many Internet sites that provide information on CF have been developed, although adherence to validated guidelines for online health information is not required. The purpose of this study was to assess systematically web sites with content pertaining to CF for adherence to the published AMA guidelines. The search term "cystic fibrosis" was entered into a commonly used search engine (Google), and the first 100 eligible sites were reviewed. Each site was examined for adherence to the AMA Guidelines for Medical and Health Information Sites on the Internet using a series of adapted questions. There were 15 questions divided into the following main categories: 1) site structure and viewer privacy, 2) author accountability, 3) scientific citation, and 4) patient safety. The number of positives for each question was tabulated. With respect to site structure, fewer than half (45%) of the reviewed sites indicated a date of last revision. Only 11 (11%) carried an explicit privacy policy. A responsible author or group was listed in only 43 (43%) of 100 sites. Presented data regarding CF was supported by references, sources, or expert review in only 38 (38%) of 100 sites. A medical disclaimer noting that information provided does not substitute for evaluation by a health care team was evident in only 37 (37%) sites. The majority of easily accessible CF informational web sites do not adhere to guidelines published by the AMA. Patients and families who use the Internet as a CF information resource should examine the web sites carefully and be

  6. 75 FR 22627 - Chrysler LLC, St. Louis North Assembly Plant Including On-Site Leased Workers From HAAS TCM, Inc...

    Science.gov (United States)

    2010-04-29

    ... North Assembly Plant Including On-Site Leased Workers From HAAS TCM, Inc., Logistics Services, Inc., Robinson Solutions, Logistics Management Services, Inc., Corrigan Company and Murphy Company, Fenton, MO... workers from HAAS TCM, Inc., Logistics Services, Inc., Robinson Solutions, Logistics Management Services...

  7. 76 FR 6490 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-02-04

    ... permit to take (trap, seine, capture, handle, fin clip, release, collect, transport, and captive breed... requests a permit to take (capture, handle, collect, transport, and kill) the Lost River sucker (Deltistes... Service, invite the public to comment on the following applications to conduct certain activities with...

  8. Numeric E.I.A.`s techniques to determine suitable sites for solid waste sanitary plants; Tecniche numeriche di V.I.A. per l`individuazione dei siti idonei alla localizzazione di impianti di smaltimento dei rifiuti solidi

    Energy Technology Data Exchange (ETDEWEB)

    Valentini, A.

    1997-07-01

    A standard procedure for choosing suitable sites for the localization of waste treatment and disposal plants is the main step for a correct sanitary program. Two are the principal difficulties: to define a correct group of criteria, excluding and limiting conditions to be applied in the E.I.A.`s techniques: to employ a simplified and flexible methodology that permits to obtain a suitable sites hierarchy. An E.I.A.`s methodology is proposed, distinguished in three numeric techniques with different complexity. Beside, to limit the subjectiveness of the user`s judgement, two solutions are applied, i.e., a method to define the impact factors of the Plant system and a sensitivity test be applied on the importance range of values. =

  9. Ultrafast X-ray absorption study of longitudinal-transverse phonon coupling in electrolyte aqueous solution

    DEFF Research Database (Denmark)

    Jiao, Yishuo; Adams, Bernhard W.; Dohn, Asmus Ougaard

    2017-01-01

    Ultrafast X-ray absorption spectroscopy is applied to study the conversion of longitudinal to transverse phonons in aqueous solution. Permanganate solutes serve as X-ray probe molecules that permit the measurement of the conversion of 13.5 GHz, longitudinal phonons to 27 GHz, transverse phonons...

  10. The status of Yucca Mountain site characterization activities

    International Nuclear Information System (INIS)

    Gertz, Carl P.; Larkin, Erin L.; Hamner, Melissa

    1992-01-01

    The U.S. Department of Energy (DOE) Office of Civilian Radioactive Waste Management (OCRWM) is continuing its studies to determine if Yucca Mountain, Nevada, can safely isolate high-level nuclear waste for the next ten thousand years. As mandated by Congress in 1987, DOE is studying the rocks, the climate, and the water table at Yucca Mountain to ensure that the site is suitable before building a repository adopt 305 meters below the surface. Yucca Mountain, located 160.9 kilometers northwest of Las Vegas, lies on the western edge of the Nevada Test Site. Nevada and DOE have been in litigation over environmental permits needed to conduct studies, but recent court decisions have allowed limited new work to begin. This paper will examine progress made on the Yucca Mountain Site Characterization Project (YMP) during 1991 and continuing into 1992, discuss the complex legal issues and describe new site drilling work. Design work on the underground exploratory studies facility (ESF) will also be discussed. (author)

  11. Annual Site Environmental Report: 2006

    Energy Technology Data Exchange (ETDEWEB)

    Nuckolls, H.; /SLAC

    2008-02-22

    2006 to better manage chemical use. Program-specific details are discussed below. SLAC operates its air quality management program in compliance with its established permit conditions. The Bay Area Air Quality Management District (BAAQMD) did not conduct a facility inspection of SLAC during 2006, though it did visit the site on four different occasions. The BAAQMD did compliment SLAC for the overall configuration of SLAC's gasoline dispensing facility and of SLAC's asbestos/demolition notification program during two of the visits. DOE awarded SLAC the 2006 Best in Class for Pollution Prevention and Environmental Stewardship Accomplishment in recognition of SLAC's CMS program which manages the procurement and use of chemicals. As an example of the efficiency of the CMS, SLAC reviewed its use of gases and associated tanks and phased out numerous gas tanks that were no longer needed or were not acceptable for long-term storage, in turn, reducing SLAC's on-site chemical inventory. As part of SLAC's waste minimization and management efforts, more than one thousand tons of municipal solid waste was recycled by SLAC during 2006. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2006, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2006, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. The Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several

  12. Crystal Nucleation of Tolbutamide in Solution: Relationship to Solvent, Solute Conformation, and Solution Structure.

    Science.gov (United States)

    Zeglinski, Jacek; Kuhs, Manuel; Khamar, Dikshitkumar; Hegarty, Avril C; Devi, Renuka K; Rasmuson, Åke C

    2018-04-03

    The influence of the solvent in nucleation of tolbutamide, a medium-sized, flexible and polymorphic organic molecule, has been explored by measuring nucleation induction times, estimating solvent-solute interaction enthalpies using molecular modelling and calorimetric data, probing interactions and clustering with spectroscopy, and modelling solvent-dependence of molecular conformation in solution. The nucleation driving force required to reach the same induction time is strongly solvent-dependent, increasing in the order: acetonitrilenucleation difficulty is a function of the strength of solvent-solute interaction, with emphasis on the interaction with specific H-bonding polar sites of importance in the crystal structure. A clear exception from this rule is the most difficult nucleation in toluene despite the weakest solvent-solute interactions. However molecular dynamics modelling predicts that tolbutamide assumes an intramolecularly H-bonded conformation in toluene, substantially different from and more stable than the conformation in the crystal structure, and thus presenting an additional barrier to nucleation. This explains why nucleation in toluene is the most difficult and why the relatively higher propensity for aggregation of tolbutamide molecules in toluene solution, as observed with FTIR spectroscopy, does not translate into easier nucleation. Thus, our combined experimental and molecular modelling study suggests that the solvent can influence on the nucleation not only via differences in the desolvation but also through the influence on molecular conformation. © 2018 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  13. ADVANCED DESIGN SOLUTIONS FOR HIGH-PRECISION WOODWORKING MACHINES

    Directory of Open Access Journals (Sweden)

    Giuseppe Lucisano

    2016-03-01

    Full Text Available With the aim at performing the highest precision during woodworking, a mix of alternative approaches, fruitfully integrated in a common design strategy, is essential. This paper represents an overview of technical solutions, recently developed by authors, in design of machine tools and their final effects on manufacturing. The most advanced solutions in machine design are reported side by side with common practices or little everyday expedients. These design actions are directly or indirectly related to the rational use of materials, sometimes very uncommon, as in the case of magnetorheological fluids chosen to implement an active control in speed and force on the electro-spindle, and permitting to improve the quality of wood machining. Other actions are less unusual, as in the case of the adoption of innovative anti-vibration supports for basement. Tradition or innovation, all these technical solutions contribute to the final result: the highest precision in wood machining.

  14. Site study plan for cultural resources, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Cultural Resources Site Study Plan describes a field program to identify and evaluate the archaeological, historical, and Native American Indian resources of the site on local and regional perspectives; monitor and manage discovered cultural resources; and establish a worker education program. The archaeological field program consists of three pedestrian surveys: Survey 1 includes two EDBH seismic survey lines and the area within the exploratory shaft facility (ESF); Survey 2 includes the remainder of the site plus a 1/4 to 3/4-mi border area; and Survey 3 includes an assortment of offsite areas. The historical studies will identify and evaluate known and discovered historical sites and structures and the Native American Indian will identify and evaluate cultural and religious concerns expressed by Indian tribal groups. Prehistoric and historic sites will be evaluated to determine if they meet eligibility criteria for listing on the National Register of Historic Places. This site study plan describes the need for each study; its design and design rationale; analysis, management, and use of data; schedule of field activities; organization of field personnel and sample management; and quality assurance requirements. The cultural resource studies will provide data for satisfying the Programmatic Agreement, engineering design needs, and SRP requirements for permits and approvals, and for minimizing effects to any cultural properties discovered during site characterization. 75 refs., 10 figs., 2 tabs

  15. Conference report : PERM-IT '97

    International Nuclear Information System (INIS)

    Smyth, V.; Yeabsley, A.

    1997-01-01

    The PERM-IT conference (Physics Engineering Radiation Medicine with a special emphasis on Information Technology) which was held in Adelaide with an attendance of about 250, was the joint annual meeting of the Australasian Radiation Protection Society, the Australasian College of Physical Scientists and Engineers in Medicine, the College of Biomedical Engineers of the Institution of Engineers Australia and the Society for Medical and Biological Engineering. The program was organised with three parallel sessions running most of the time, with plenary sessions for items of particular interest featuring keynote speakers from around the world. Attendance at this conference allowed the opportunity to meet with colleagues in other regulatory agencies, and Australia has a number of these. But what should be done about radioactive waste? A universal groan is raised by radiation protection regulatory authority staff at this question. Plans are afoot to develop a whole of Australia radioactive waste repository with both burial and above ground facilities. An announcement on the suitability of various sites in order of preference is expected, but in the meantime, facilities are fragemented. Discussions were held with staff from the radiation standards section of the Australian Radiation Laboratory who face similar problems to NRL including reducing funding, the move to cost recovery, and working towards quality managment accreditation. Plans for a further intercomparison between the Australian and NZ primary standards are being made. (author)

  16. Mobile laboratories: An innovative and efficient solution for radiological characterization of sites under or after decommissioning.

    Science.gov (United States)

    Goudeau, V; Daniel, B; Dubot, D

    2017-04-21

    During the operation and the decommissioning of a nuclear site the operator must assure the protection of the workers and the environment. It must furthermore identify and classify the various wastes, while optimizing the associated costs. At all stages of the decommissioning radiological measurements are performed to determine the initial situation, to monitor the demolition and clean-up, and to verify the final situation. Radiochemical analysis is crucial for the radiological evaluation process to optimize the clean-up operations and to the respect limits defined with the authorities. Even though these types of analysis are omnipresent in activities such as the exploitation, the monitoring, and the cleaning up of nuclear plants, some nuclear sites do not have their own radiochemical analysis laboratory. Mobile facilities can overcome this lack when nuclear facilities are dismantled, when contaminated sites are cleaned-up, or in a post-accident situation. The current operations for the characterization of radiological soils of CEA nuclear facilities, lead to a large increase of radiochemical analysis. To manage this high throughput of samples in a timely manner, the CEA has developed a new mobile laboratory for the clean-up of its soils, called SMaRT (Shelter for Monitoring and nucleAR chemisTry). This laboratory is dedicated to the preparation and the radiochemical analysis (alpha, beta, and gamma) of potentially contaminated samples. In this framework, CEA and Eichrom laboratories has signed a partnership agreement to extend the analytical capacities and bring on site optimized and validated methods for different problematic. Gamma-emitting radionuclides can usually be measured in situ as little or no sample preparation is required. Alpha and beta-emitting radionuclides are a different matter. Analytical chemistry laboratory facilities are required. Mobile and transportable laboratories equipped with the necessary tools can provide all that is needed. The main

  17. Formula Manufacturers' Web Sites: Are They Really Non-Compliant Advertisements?

    Science.gov (United States)

    Gunter, Barrie; Dickinson, Roger; Matthews, Julian; Cole, Jennifer

    2013-01-01

    Purpose: In the UK, advertising of infant formula products direct to consumers is not permitted. These products must be used on the recommendation of suitably qualified health or medical professionals. The aim of this study is to examine formula manufacturers' web sites to ascertain whether these are used as alternative forms of advertising that…

  18. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 8

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, D.A. [ed.; Bjornstad, B.N.; Fosmire, C.J.; Fowler, R.A. [and others

    1996-08-01

    This eighth revision of the Hanford Site National Environmental Policy Act (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Chapters 4 and 6 in Hanford Site-related NEPA documents. Chapter 4 (Affected Environment) includes information on climate and meteorology, geology, hydrology, ecology, historical, archaeological and cultural resources, socioeconomics, and noise. Chapter 6 (Statutory and Regulatory Requirements) provides the preparer with the federal and state regulations, DOE directives and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site. The following sections were updated in this revision: climate and meteorology; ecology (threatened and endangered species section only); historical; archaeological and cultural resources; and all of chapter 6. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be used directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the hanford Site and its past activities by which to evaluate projected activities and their impacts.

  19. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 8

    International Nuclear Information System (INIS)

    Neitzel, D.A.; Bjornstad, B.N.; Fosmire, C.J.; Fowler, R.A.

    1996-08-01

    This eighth revision of the Hanford Site National Environmental Policy Act (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Chapters 4 and 6 in Hanford Site-related NEPA documents. Chapter 4 (Affected Environment) includes information on climate and meteorology, geology, hydrology, ecology, historical, archaeological and cultural resources, socioeconomics, and noise. Chapter 6 (Statutory and Regulatory Requirements) provides the preparer with the federal and state regulations, DOE directives and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site. The following sections were updated in this revision: climate and meteorology; ecology (threatened and endangered species section only); historical; archaeological and cultural resources; and all of chapter 6. No conclusions or recommendations are given in this report. Rather, it is a compilation of information on the Hanford Site environment that can be used directly by Site contractors. This information can also be used by any interested individual seeking baseline data on the hanford Site and its past activities by which to evaluate projected activities and their impacts

  20. On the forecast skill of a convection-permitting ensemble

    Science.gov (United States)

    Schellander-Gorgas, Theresa; Wang, Yong; Meier, Florian; Weidle, Florian; Wittmann, Christoph; Kann, Alexander

    2017-01-01

    The 2.5 km convection-permitting (CP) ensemble AROME-EPS (Applications of Research to Operations at Mesoscale - Ensemble Prediction System) is evaluated by comparison with the regional 11 km ensemble ALADIN-LAEF (Aire Limitée Adaption dynamique Développement InterNational - Limited Area Ensemble Forecasting) to show whether a benefit is provided by a CP EPS. The evaluation focuses on the abilities of the ensembles to quantitatively predict precipitation during a 3-month convective summer period over areas consisting of mountains and lowlands. The statistical verification uses surface observations and 1 km × 1 km precipitation analyses, and the verification scores involve state-of-the-art statistical measures for deterministic and probabilistic forecasts as well as novel spatial verification methods. The results show that the convection-permitting ensemble with higher-resolution AROME-EPS outperforms its mesoscale counterpart ALADIN-LAEF for precipitation forecasts. The positive impact is larger for the mountainous areas than for the lowlands. In particular, the diurnal precipitation cycle is improved in AROME-EPS, which leads to a significant improvement of scores at the concerned times of day (up to approximately one-third of the scored verification measure). Moreover, there are advantages for higher precipitation thresholds at small spatial scales, which are due to the improved simulation of the spatial structure of precipitation.

  1. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 9

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, D.A. [ed.; Bjornstad, B.N.; Fosmire, C.J. [and others

    1997-08-01

    This ninth revision of the Hanford Site National Environmental Policy Act (NEPA) Characterization presents current environmental data regarding the hanford Site and its immediate environs. This information is intended for use in preparing Chapters 4 and 6 in Hanford Site-related NEPA documents. Chapter 4.0 (Affected Environment) includes information on climate and meteorology, geology, hydrology, ecology, cultural, archaeological and historical resources, socioeconomics, and noise. Chapter 6.0 (Statutory and Regulatory Requirements) provides the preparer with the federal and state regulations, DOE directives and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site. Not all of the sections have been updated for this revision. The following lists the updated sections: climate and meteorology; ecology (threatened and endangered species section only); culture, archaeological, and historical resources; socioeconomics; all of Chapter 6.

  2. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 9

    International Nuclear Information System (INIS)

    Neitzel, D.A.; Bjornstad, B.N.; Fosmire, C.J.

    1997-08-01

    This ninth revision of the Hanford Site National Environmental Policy Act (NEPA) Characterization presents current environmental data regarding the hanford Site and its immediate environs. This information is intended for use in preparing Chapters 4 and 6 in Hanford Site-related NEPA documents. Chapter 4.0 (Affected Environment) includes information on climate and meteorology, geology, hydrology, ecology, cultural, archaeological and historical resources, socioeconomics, and noise. Chapter 6.0 (Statutory and Regulatory Requirements) provides the preparer with the federal and state regulations, DOE directives and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site. Not all of the sections have been updated for this revision. The following lists the updated sections: climate and meteorology; ecology (threatened and endangered species section only); culture, archaeological, and historical resources; socioeconomics; all of Chapter 6

  3. Shielding requirements on-site loading and acceptance testing on the Leksell gamma knife

    International Nuclear Information System (INIS)

    Maitz, A.H.; Lunsford, L.D.; Wu, A.; Lindner, G.; Flickinger, J.C.

    1990-01-01

    On August 14, 1987, the first stereotactic radiosurgical procedure using the gamma knife was performed in North America. Located in a self-contained radiosurgical suite in the basement of Presbyterian-University Hospital in Pittsburgh, Pennsylvania. This device uses 201 highly focused beams 60Co for the single-treatment closed-skull irradiation of brain lesions localized by stereotactic techniques (radiosurgery). One hundred and fifty-two patients with intracranial arteriovenous malformations or brain tumors were treated in the first year of operation. The Presbyterian University Hospital of Pittsburgh gamma knife is the first such unit in which the 60Co sources were loaded on-site. This effort required us to solve some difficult and unusual problems encountered during site preparation, delivery, and loading of the unit in a busy hospital setting. The solutions developed enabled installation and use of the gamma knife with minimal disruption of hospital activities while maintaining acceptable levels of exposure to radiation. Environmental surveys performed during the loading of the 201 radioactive sources (total, 219 TBq) confirmed that on-site loading is possible and practical. Our experience in the design, construction, and implementation of the first North American gamma knife supports the practicality and safety of on-site loading and may be of value in the planning and development of future gamma knife installations

  4. RCRA permitting strategies for the development of innovative technologies: Lessons from Hanford

    International Nuclear Information System (INIS)

    Gajewski, S.W.; Donaghue, J.F.

    1994-01-01

    The Hanford Site restoration is the largest waste cleanup operation in history. The Hanford plutonium production mission generated two-thirds of all the nuclear waste, by volume, in the Department of Energy (DOE) Complex. Cleanup challenges include not only large stored volumes of radioactive, hazardous, and mixed waste, but contaminated soil and groundwater and scores of major structures slated for decontamination, decommissioning, and demolition. DOE and its contractors will need to invent the technology required to do the job on a timetable driven by negotiated milestones, public concerns, and budgetary constraints. This paper will discuss the effort at Hanford to develop an integrated, streamlined strategy for compliance with the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) in the conduct of research, development, and demonstration (RD ampersand D) of innovative cleanup technologies. The aspects that will be discussed include the following: the genesis of the RD ampersand D permitting challenge at Hanford; permitting options in the existing regulatory framework; regulatory options that offered the best fit for Hanford RD ampersand D activities, and the problems associated with them; and conclusions and recommendations made to regulatory bodies

  5. Nevada Test Site annual site environmental report for calendar year 1996

    Energy Technology Data Exchange (ETDEWEB)

    Black, S.C.; Townsend, Y.E. [eds.

    1997-10-01

    Monitoring and surveillance on and around the Nevada Test Site (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1996 indicated that operations on the NTS were conducted in compliance with applicable DOE, state, and federal regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of liquid effluents, or resuspension of soil was not detectable offsite, and exposure above background to members of the offsite population was not measured by the offsite monitoring program. Using the US Environmental Protection Agency`s (EPA) Clean Air Package 1988 (CAP88)PC model and NTS radionuclide emissions and environmental monitoring data, the calculated effective dose equivalent (EDE) to the maximally exposed individual offsite would have been 0.11 mrem. This value is less than 2 percent of the federal dose limit prescribed for radionuclide air emissions. Any person receiving this dose would also have received 144 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act (NEPA) is being achieved and, where mandated, permits for air and water effluents and waste management have been obtained from the appropriate agencies. Cooperation with other agencies has resulted in seven different consent orders and agreements. Support facilities at off-NTS locations have complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits as mandated for each location.

  6. Nevada Test Site annual site environmental report for calendar year 1996

    International Nuclear Information System (INIS)

    Black, S.C.; Townsend, Y.E.

    1997-10-01

    Monitoring and surveillance on and around the Nevada Test Site (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1996 indicated that operations on the NTS were conducted in compliance with applicable DOE, state, and federal regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of liquid effluents, or resuspension of soil was not detectable offsite, and exposure above background to members of the offsite population was not measured by the offsite monitoring program. Using the US Environmental Protection Agency's (EPA) Clean Air Package 1988 (CAP88)PC model and NTS radionuclide emissions and environmental monitoring data, the calculated effective dose equivalent (EDE) to the maximally exposed individual offsite would have been 0.11 mrem. This value is less than 2 percent of the federal dose limit prescribed for radionuclide air emissions. Any person receiving this dose would also have received 144 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act (NEPA) is being achieved and, where mandated, permits for air and water effluents and waste management have been obtained from the appropriate agencies. Cooperation with other agencies has resulted in seven different consent orders and agreements. Support facilities at off-NTS locations have complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits as mandated for each location

  7. Procedural justice in wind facility siting: Recommendations for state-led siting processes

    International Nuclear Information System (INIS)

    Ottinger, Gwen; Hargrave, Timothy J.; Hopson, Eric

    2014-01-01

    Evidence suggests that state control of wind facility siting decisions fosters new project development more effectively than local control, yet the literature suggests that affected citizens tend to be more fairly represented in local siting processes. We argue that successful renewable energy policy must satisfy both the need for new project development and the obligation to procedural justice. To suggest how it can do so, we analyze existing state- and county-level siting processes in Washington state, finding that both fall short on measures of procedural justice. To overcome this limitation and address the tension between procedural justice and project development, we then propose a collaborative governance approach to wind facility siting, in which state governments retain ultimate authority over permitting decisions but encourage and support local-level deliberations as the primary means of making those decisions. Such an approach, we argue, would be more just, facilitate wind development by addressing community concerns constructively and result in better projects through the input of diverse stakeholders. - Highlights: • States have made wind energy development a priority. • Local opposition to new projects could hinder future wind energy development. • Procedural justice is necessary to resolve local issues and ensure timely wind facility siting. • Both state- and county-led siting processes fall short with respect to criteria for procedural justice, though local processes have some advantages. • States could instead induce counties, developers to engage in deliberation

  8. 77 FR 19719 - Whirlpool Corporation Including On-Site Leased Workers From Career Solutions TEC Staffing, IBM...

    Science.gov (United States)

    2012-04-02

    ... Logistics, Eurest, Canteen, Kelly Services, Inc., Prodriver, Arkansas Warehouse, Inc., Andrews International... information shows that workers leased from Andrews International employed on-site at the Fort Smith, Arkansas...) tax account under the name U.S. Security. Accordingly, the Department is amending this certification...

  9. On static black holes solutions in Einstein and Einstein-Gauss-Bonnet gravity with topology [Formula: see text].

    Science.gov (United States)

    Dadhich, Naresh; Pons, Josep M

    We study static black hole solutions in Einstein and Einstein-Gauss-Bonnet gravity with the topology of the product of two spheres, [Formula: see text], in higher dimensions. There is an unusual new feature of the Gauss-Bonnet black hole: the avoidance of a non-central naked singularity prescribes a mass range for the black hole in terms of [Formula: see text]. For an Einstein-Gauss-Bonnet black hole a limited window of negative values for [Formula: see text] is also permitted. This topology encompasses black strings, branes, and generalized Nariai metrics. We also give new solutions with the product of two spheres of constant curvature.

  10. 77 FR 25082 - Picture Permit Imprint Indicia

    Science.gov (United States)

    2012-04-27

    ... POSTAL SERVICE 39 CFR Part 111 Picture Permit Imprint Indicia AGENCY: Postal Service\\TM\\. ACTION... Service, Domestic Mail Manual (DMM[supreg]) 604.5 to add picture permit imprint indicia standards allowing...: The use of picture permit imprint indicia is designed to improve the effectiveness of a mailpiece by...

  11. 50 CFR 20.64 - Foreign export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Foreign export permits. 20.64 Section 20... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD HUNTING Importations § 20.64 Foreign export permits. No... such birds are accompanied by export permits, tags, or other documentation required by applicable...

  12. Hanford Site National Environmental Policy Act (NEPA) Characterization. Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Cushing, C.E. [ed.

    1992-12-01

    This fifth revision of the Hanford Site National Environmental Policy (NEPA) Characterization presents current environmental data regarding the Hanford Site and its immediate environs. This information is intended for use in preparing Site-related NEPA documentation. Information is presented on climate and meteorology, geology and hydrology, ecology, history and archaeology, socioeconomics, land use, and noise levels, prepared by Pacific Northwest Laboratory (PNL) staff. Models are described that are to be used in simulating realized or potential impacts from nuclear materials at the Hanford Site. Included are models of radionuclide transport in groundwater and atmospheric pathways, and of radiation dose to populations via all known pathways from known initial conditions. Federal and state regulations, DOE orders and permits, and environmental standards directly applicable for the NEPA documents at the Hanford Site, are provided.

  13. 77 FR 23803 - Office of Hazardous Materials Safety; Actions on Special Permit Applications

    Science.gov (United States)

    2012-04-20

    ...-M......... Conference of 49 CFR To modify the Radiation 172.203(d); special permit add Control Part............ Conference of 49 CFR Part To modify the Radiation 172, Subparts, special permit add Control C, D, E, F, G, 49...; additional mode of Berlin 173.345; transportation Packaging 173.346; (cargo vessel). (Former 173.359; Grantee...

  14. Assessment of trace ground-water contaminants release from south Texas in-situ uranium solution-mining sites

    Energy Technology Data Exchange (ETDEWEB)

    Kidwell, J.R.; Humenick, M.J.

    1981-01-01

    The future of uranium solution mining in south Texas depends heavily on the industry's ability to restore production zone ground water to acceptable standards. This study investigated the extent of trace contaminant solubilization during mining and subsequent restoration attempts, first through a literature search centered on uranium control mechanisms, and then by laboratory experiments simulating the mining process. The literature search indicated the complexity of the situation. The number of possible interactions between indigenous elements and materials pointed on the site specificity of the problem. The column studies evaluated three different production area ores. Uranium, molybdenum, arsenic, vanadium, and selenium were analyzed in column effluents. After simulated mining operations were completed, uranium was found to be the most persistent trace element. However, subsequent ground water flushing of the columns could restore in-situ water to EPA recommended drinking water concentrations. Limited data indicated that ground water flowing through mined areas may solubilize molybdenum present in down gradient areas adjacent to the production zone due to increased oxidation potential of ground water if adequate restoration procedures are not followed.

  15. Tradeable emission permits in Dutch environmental policy. A utopia?

    International Nuclear Information System (INIS)

    Schuurman, S.J.

    1997-01-01

    Because of the lack of experience with permits in the Netherlands, and in view of the similarities between various other tradeable permit systems, the functioning of Dutch systems of tradeable fish, milk and manure quotas is discussed. Evaluation of these systems is based on criteria of effectiveness, target-group efficiency and government efficiency. These systems of tradeable permits appear to constitute a successful addition to the Dutch policy of direct regulation. Considering this, and the favorable American experience with the Emissions Trading Program, tradeable emission permits deserve a chance to be implemented in Dutch environmental policy. The question remains, however, whether the Dutch government is ready for such a step. 28 refs

  16. 50 CFR 21.21 - Import and export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Import and export permits. 21.21 Section... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.21 Import and export... must have a permit to import or export migratory birds, their parts, nests, or eggs. You must meet the...

  17. Bases for DOT exemption uranyl nitrate solution shipments

    International Nuclear Information System (INIS)

    Moyer, R.A.

    1982-07-01

    Uranyl nitrate solutions from a Savannah River Plant reprocessing facility have been transported in cargo tank trailers for more than 20 years without incident during transit. The solution is shipped to Oak Ridge for further processing and returned to SRP in a solid metal form for recycle. This solution, called uranyl nitrate hexahydrate (UNH) solution in Department of Transportation (DOT) regulations, is currently diluted about 2-fold to comply with DOT concentration limits (10% of low specific activity levels) specified for bulk low specific activity (LSA) liquid shipments. Dilution of the process solution increases the number of shipments, the cost of transportation, the cost of shipper preparations, the cost of further reprocessing in the receiving facility to first evaporate the added water, and the total risk to the population along the route of travel. However, the radiological risk remains about the same. Therefore, obtaining an exemption from DOT regulations to permit shipment of undiluted UNH solution, which is normally about two times the present limit, is prudent and more economical. The radiological and nonradiological risks from shipping a unit load of undiluted solution are summarized for the probable route. Data and calculations are presented on a per load or per shipment basis throughout this memorandum to keep it unclassified

  18. Diffuse and fugitive emission dose assessment on the Hanford Site

    International Nuclear Information System (INIS)

    Davis, W.E.; Schmidt, J.W.; Gleckler, B.P.; Rhoads, K.

    1995-01-01

    On February 3, 1993, the US Department of Energy, Richland Operations Office (RL), received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the US Environmental Protection Agency (EPA), Region 10. The Compliance Order requires RL to (1) evaluate all radionuclide emission points at the Hanford Site to determine which are subject to continuous emission measurement requirements in 40 Code of Federal Regulations (CFR) 61, Subpart H, and (2) continuously measure radionuclide emissions in accordance with 40 CFR 61.93. The Information Request requires RL to provide a written Compliance Plan to meet the requirements of the Compliance Order. The RL Compliance Plan included as one of its milestones the requirement to develop a Federal Facility Compliance Agreement (FFCA). An FFCA was negotiated between RL and the EPA, Region 10, and was entered into on February 7, 1994. One of the milestones was to provide EPA, Region 10, with a copy of the Federal Clean Air Act Title V operating air permit application and Air Emission Inventory (AEI) concurrent with its submission to the Washington State Department of Ecology. The AEI will include an assessment of the diffuse and fugitive emissions from the Hanford Site. This assessment does not identify any diffuse or fugitive emission source that would cause an effective dose equivalent greater than 0.1 mrem/yr

  19. Reliable and efficient solution of genome-scale models of Metabolism and macromolecular Expression

    DEFF Research Database (Denmark)

    Ma, Ding; Yang, Laurence; Fleming, Ronan M. T.

    2017-01-01

    orders of magnitude. Data values also have greatly varying magnitudes. Standard double-precision solvers may return inaccurate solutions or report that no solution exists. Exact simplex solvers based on rational arithmetic require a near-optimal warm start to be practical on large problems (current ME......Constraint-Based Reconstruction and Analysis (COBRA) is currently the only methodology that permits integrated modeling of Metabolism and macromolecular Expression (ME) at genome-scale. Linear optimization computes steady-state flux solutions to ME models, but flux values are spread over many...... models have 70,000 constraints and variables and will grow larger). We have developed a quadrupleprecision version of our linear and nonlinear optimizer MINOS, and a solution procedure (DQQ) involving Double and Quad MINOS that achieves reliability and efficiency for ME models and other challenging...

  20. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 10

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, D.A. [ed.; Fosmire, C.J.; Fowler, R.A. [and others

    1998-09-01

    This document describes the US Department of Energy`s (DOE) Hanford Site environment and is numbered to correspond to the chapters where such information is presented in Hanford Site NEPA related documents. The document is intended to provide a consistent description of the Hanford Site environment for the many NEPA documents that are being prepared by contractors. The two chapters in this document (Chapters 4 and 6) are numbered this way to correspond to the chapters where such information is presented in environmental impact statements (EISs) and other Site-related NEPA or CERCLA documentation. Chapter 4.0 (Affected Environment) describes the Hanford Site environment, and includes information on climate and meteorology, geology, hydrology, ecology, cultural, archaeological and historical resources, socioeconomics, and noise. Chapter 6.0 (Statutory and Regulatory Requirements) describes applicable federal and state laws and regulations, DOE directives and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site.

  1. Hanford Site National Environmental Policy Act (NEPA) characterization. Revision 10

    International Nuclear Information System (INIS)

    Neitzel, D.A.; Fosmire, C.J.; Fowler, R.A.

    1998-09-01

    This document describes the US Department of Energy's (DOE) Hanford Site environment and is numbered to correspond to the chapters where such information is presented in Hanford Site NEPA related documents. The document is intended to provide a consistent description of the Hanford Site environment for the many NEPA documents that are being prepared by contractors. The two chapters in this document (Chapters 4 and 6) are numbered this way to correspond to the chapters where such information is presented in environmental impact statements (EISs) and other Site-related NEPA or CERCLA documentation. Chapter 4.0 (Affected Environment) describes the Hanford Site environment, and includes information on climate and meteorology, geology, hydrology, ecology, cultural, archaeological and historical resources, socioeconomics, and noise. Chapter 6.0 (Statutory and Regulatory Requirements) describes applicable federal and state laws and regulations, DOE directives and permits, and environmental standards directly applicable to the NEPA documents on the Hanford Site

  2. A database for extract solutions in general relativity

    International Nuclear Information System (INIS)

    Horvath, I.; Horvath, Zs.; Lukacs, B.

    1993-07-01

    The field of equations of General Relativity are coupled second order partial differential equations. Therefore no general method is known to generate solutions for prescribed initial and boundary conditions. In addition, the meaning of the particular coordinates cannot be known until the metric is not found. Therefore the result must permit arbitrary coordinate transformations, i.e. most kinds of approximating methods are improper. So exact solutions are necessary and each one is an individual product. For storage, retrieval and comparison database handling techniques are needed. A database of 1359 articles is shown (cross-referred at least once) published in 156 more important journals. It can be handled by dBase III plus on IBM PC's. (author) 5 refs.; 5 tabs

  3. Integrated account of method, site selection and programme prior to the site investigation phase

    International Nuclear Information System (INIS)

    2000-12-01

    In order to dispose of the spent nuclear fuel in a safe manner, SKB plans to site a deep repository and an encapsulation plant with associated canister fabrication and transportation system. After an integrated evaluation of feasibility studies and other material, SKB will proceed with investigations of the rock and studies regarding establishment of the deep disposal system in the municipality of Oskarshamn or in Northern Uppland. The plans also include further study of the prospects for a deep repository in the municipality of Nykoeping. In the municipality of Oskarshamn, SKB plans further studies of a siting of the deep repository at Simpevarp. There SKB wants to initiate site investigations with test drilling. For the encapsulation plant, SKB wants to continue studying a siting at CLAB. In Northern Uppland, SKB plans to study two siting alternatives for the deep repository. One is Forsmark in the municipality of Oesthammar, where SKB wants to initiate a site investigation with test drilling. The other is Tierp north of Skutskaer, where SKB intends to start test drilling in an area north of Tierp. First, however, a suitable drilling area with possible transport solutions needs to be defined. This alternative requires the participation of the municipalities of both Tierp and Aelvkarleby. A siting of the encapsulation plant in Northern Uppland will also be studied. For the municipality of Nykoeping, SKB plans to conduct a new safety assessment for the Fjaellveden area, based on data from previous investigations as well as additional studies of how a deep repository could be arranged. SKB will thereby gather data from yet another geographic and geological region beyond those that are prioritized. No test drilling is planned in Nykoeping. The goal of the site investigation phase is to obtain all permits needed to build the planned facilities. It will take an estimated 7 - 8 years to assemble the requisite supporting material, carry out consultations, compile siting

  4. Waste water pilot plant research, development, and demonstration permit application

    International Nuclear Information System (INIS)

    1993-03-01

    This permit application has been prepared to obtain a research, development, and demonstration permit to perform pilot-scale treatability testing on the 242-A Evaporator process condensate waste water effluent stream. It provides the management framework, and controls all the testing conducted in the waste water pilot plant using dangerous waste. It also provides a waste acceptance envelope (upper limits for selected constituents) and details the safety and environmental protection requirements for waste water pilot plant testing. This permit application describes the overall approach to testing and the various components or requirements that are common to all tests. This permit application has been prepared at a sufficient level of detail to establish permit conditions for all waste water pilot plant tests to be conducted

  5. Permits for coal-fired power plants under scrutiny

    International Nuclear Information System (INIS)

    Hoekstra, B.

    2011-01-01

    The attorney-general of the European Court of Justice offered advice to the European Judge on the prejudicial questions of the Department of Administrative Law of the Council of State in the framework of appeal cases against environmental permits of three planned power plants in the Netherlands. The advice may have large consequences for these permits. [nl

  6. Bill project aiming at abrogating exclusive search permits for unconventional hydrocarbon searches, and at prohibiting their exploration and exploitation of the national territory

    International Nuclear Information System (INIS)

    2011-01-01

    After having briefly recalled the origin of shale gases, their extraction process and the evolution of their production in the USA, the authors outline the extremely negative environmental impacts of the fracking technique (hydraulic fracturing): water pollution, air pollution, soil pollution, existence of numerous drilling sites which would degrade landscapes, water and soil contamination risks. As some search permits have already been awarded, and while taking these negative consequences into account, the authors propose a bill project to prohibit these explorations, to abrogate the existing permits, and to ensure public information before bestowing such search permits and exploitation concessions

  7. Experiences in solving the challenges of on-site degree programs

    International Nuclear Information System (INIS)

    Christenson, J.M.; Eckart, L.E.

    1987-01-01

    The University of Cincinnati (UC) Nuclear Engineering Program Faculty has now had six years of experience in delivering on-site educational programs to nuclear power plant technical personnel. Programs of this type present a variety of challenges to the faculty, the management of the client utility and to the students who become involved in a particular program. This paper describes how each of these groups can identify and successfully solve these challenges. The solutions the authors describe are drawn from their own experiences which have been described in some detail elsewhere. Other solutions to those challenges are certainly possible. They make no claim for the particular ones they offer, beyond the fact that they have worked over a sustained period of time and that results they have produced have left all three parties mutually satisfied

  8. 77 FR 71818 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-12-04

    ... following permit requests. Applicant Permit No. TE-78622A Applicant: William J. Mautz, Hilo, Hawaii The...-179036 Applicant: Cullen A. Wilkerson, Richmond, California The applicant requests a permit renewal to...

  9. Legal Review: Issuance of Separate Permits for a Nuclear Reactor for Research

    International Nuclear Information System (INIS)

    Chang, Gun-Hyun; Kim, Sang-Wwon; Koh, Jae-Dong; Kim, Chang-Bum; Ahn, Sang-kyu

    2006-01-01

    With regard to the nuclear reactor permission system under the Atomic Energy Act of the Republic of Korea, two types of permits must be obtained for nuclear power reactors under Article 11 and Article 21 of the Atomic Energy Act: construction permits and operation permits. Concerning nuclear reactors for research, however, only one permit is required: a dual permit that authorizes both construction and operation, under Article 33 of said act. This permit can be obtained by submitting an application for a dual construction and operation permit to the regulatory authority. The question is whether a dual permit can be issued for nuclear reactors for research under any circumstances. If the literal provisions of the Atomic Energy Act are applied rigorously even in cases where it is realistically difficult to submit a dual permit application or issue a dual permit for construction and operation considering the power output, usage, and design complexity of nuclear reactors for research, separate permits for construction or operation shall never be issued, with only dual permits for construction and operation issued. For the Hanaro research reactor, a dual permit was issued with a condition attached thereto based on the literal provisions of the Atomic Energy Act at the time of its construction, although an application for and issuance of a dual permit for its construction and operation were impossible at the time. This is in violation of the purport of the law that provides for a dual permit

  10. Geochemical Data Package for Performance Assessment Calculations Related to the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Kaplan, Daniel I. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2010-03-15

    The Savannah River Site disposes of low-activity radioactive waste within subsurface-engineered facilities. One of the tools used to establish the capacity of a given site to safely store radioactive waste (i.e., that a site does not exceed its Waste Acceptance Criteria) is the Performance Assessment (PA). The objective of this document is to provide the geochemical values for the PA calculations. This work is being conducted as part of the on-going maintenance program that permits the PA to periodically update existing calculations when new data become available.

  11. Floodplain District Permit

    Data.gov (United States)

    Montgomery County of Maryland — The purpose of a Floodplain District Permit (FPDP) is to control floodplain development in order to protect persons and property from danger and destruction and to...

  12. Analysis of Quadratic Diophantine Equations with Fibonacci Number Solutions

    Science.gov (United States)

    Leyendekkers, J. V.; Shannon, A. G.

    2004-01-01

    An analysis is made of the role of Fibonacci numbers in some quadratic Diophantine equations. A general solution is obtained for finding factors in sums of Fibonacci numbers. Interpretation of the results is facilitated by the use of a modular ring which also permits extension of the analysis.

  13. Tradable CO2 permits in Danish and European energy policy

    DEFF Research Database (Denmark)

    Varming, S.; Eriksen, P.B.; Grohnheit, Poul Erik

    2000-01-01

    This report presents the results of the project "Tradable CO2 permits in Danish and European energy policy". The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operationbetween Elsamprojekt A/S (project manager...... for a tradable CO_2 permit market for the energy sector in the EU. Experience from the tradable SO_2 permit market in the US is taken into consideration as well. Topresent an overview of price estimates of CO_2 and greenhouse gas permits in different models as well as discussing the assumptions leading...... to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices isanalysed. To analyse the connection between CO_2 permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat...

  14. IFQ Halibut/Sablefish and CDQ Halibut Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Under the IFQ Halibut/Sablefish Permit Program and CDQ Halibut Permit Program permits are issued for harvesting and receiving/processing halibut, and non-trawl...

  15. 5 CFR 734.202 - Permitted activities.

    Science.gov (United States)

    2010-01-01

    ... (CONTINUED) POLITICAL ACTIVITIES OF FEDERAL EMPLOYEES Permitted Activities § 734.202 Permitted activities. Employees may take an active part in political activities, including political management and political campaigns, to the extent not expressly prohibited by law and this part. ...

  16. 78 FR 12776 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-02-25

    ... and recovery purposes to conduct pollination on 36 individual adult Arizona hedgehog cactus.... Permit TE-43777A Applicant: Sea Life US, LLC, Grapevine, Texas. Applicant requests an amendment to a... Aquarium, Grapevine, Texas. Permit TE-92366A Applicant: Kimley-Horn and Associates, Inc., Dallas, Texas...

  17. Modeling water flow and solute transport in unsaturated zone inside NSRAWD project

    International Nuclear Information System (INIS)

    Constantin, A.; Diaconu, D.; Bucur, C.; Genty, A.

    2015-01-01

    The NSRAWD project (2010-2013) - Numerical Simulations for Radioactive Waste Disposal was initiated under a collaboration agreement between the Institute for Nuclear Research and the French Alternative Energies and Atomic Energy Commission (CEA). The context of the project was favorable to combine the modeling activities with an experimental part in order to improve and validate the numerical models used so far to simulate water flow and solute transport at Saligny site, Romania. The numerical models developed in the project were refined and validated on new hydrological data gathered between 2010-2012 by a monitoring station existent on site which performs automatic determination of soil water content and matrix potential, as well as several climate parameters (wind, temperature and precipitations). Water flow and solute transport was modeled in transient conditions, by taking into consideration, as well as neglecting the evapotranspiration phenomenon, on the basis of a tracer test launched on site. The determination of dispersivities for solute transport was targeted from the solute plume. The paper presents the main results achieved in the NSRAWD project related to water flow and solute transport in the unsaturated area of the Saligny site. The results indicated satisfactory predictions for the simulation of water flow in the unsaturated area, in steady state and transient conditions. In the case of tracer transport modeling, dispersivity coefficients could not be finally well fitted for the data measured on site and in order to obtain a realistic preview over the values of these parameters, further investigations are recommended. The article is followed by the slides of the presentation

  18. 75 FR 38129 - Freescale Semiconductor, Inc., Hardware/Software Design and Manufacturing A Including On-Site...

    Science.gov (United States)

    2010-07-01

    ... Manufacturing A, Austin, Texas. The notice was published in the Federal Register on May 28, 2010 (75 FR 30070...Logic, Inc., Austin, TX; Amended Certification Regarding Eligibility To Apply for Worker Adjustment..., Design Solutions, Inc., Veriseo, SilconElite and MicroLogic, Inc. were employed on-site at the Austin...

  19. 29 CFR 785.12 - Work performed away from the premises or job site.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Work performed away from the premises or job site. 785.12... of Principles Employees âsuffered Or Permittedâ to Work § 785.12 Work performed away from the premises or job site. The rule is also applicable to work performed away from the premises or the job site...

  20. BCDC Minor Permits

    Data.gov (United States)

    California Natural Resource Agency — An administrative permit can be issued for an activity that qualifies as a minor repair or improvement in a relatively short period of time and without a public...

  1. Account of volume heat capacity on interface in numerical solution of the Stephen problem using the strained coordinates method

    International Nuclear Information System (INIS)

    Latynin, V.A.; Reshetov, V.A.; Karaseva, L.N.

    1988-01-01

    Numerical solution of the Stephen problem by the strained coordinate method is presented for an one-dimensional sphere. Differential formulae of heat fluxes from moving interfaces do not take into account volume heat capacities of the front nodes. Calculations, carried out according to these balanced formulae, as well as according to those usually used, have shown that the balanced formulae permit to reduce approximately by an order the number of nodes on the sphere radius, if similar accuracy of heat balance of the whole process of melting or crystallization is observed. 2 refs.; 1 fig

  2. 75 FR 54497 - Ocean Dumping; Guam Ocean Dredged Material Disposal Site Designation

    Science.gov (United States)

    2010-09-08

    .... SUMMARY: The EPA is designating the Guam Deep Ocean Disposal Site (G- DODS) as a permanent ocean dredged... administration of ocean disposal permits; (2) development and maintenance of a site monitoring program; (3... include: (1) Regulating quantities and types of material to be disposed, including the time, rates, and...

  3. 77 FR 71033 - Notice of Applications for Modification of Special Permit

    Science.gov (United States)

    2012-11-28

    ... Lincoln, NE. permit to authorize an alternative fire protection system. 15461-M Kidde Products High 49 CFR... Systems Inc. 49 CFR 172.200, To reissue the special Plymouth, MI. 177.834. permit originally issued on an... Applications for Modification of Special Permit AGENCY: Office of Hazardous Materials Safety, Pipeline and...

  4. The Study on Policy Options for Siting Hazardous Energy Facility

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jin Oh [Korea Energy Economics Institute, Euiwang (Korea)

    2000-10-01

    The problem of site allocation on locally unwanted land uses related to energy utilities that extended most recently is becoming a new energy policy issue due to the improvement of national standard of living and livelihood quality. Residents do not generally agree on establishing the construction of public energy utilities in their village due to NIMBY syndrome while they basically agree to have them. These circumstances made a big problem against mass production of industry society and the improvement of the national welfare. Locally unwanted land use related to energy utilities includes waste incineration system, nuclear power plant, coal fired power plant, oil and Gas storage tank, briquette manufacturing plant and etc. Opportunity for SOC projects carried out by central and local government is lost because of the regional egoism. The site dispute between government and residents obstructs optimal energy supply to be necessary for industry growth and the national welfare. The main objective of this study is to propose the policy option for finding a solution after surveying theory and background of site troubles and dispute factors. Final results of this study propose a solution on structural and institutional dispute. The former introduces three kinds of approaches such as tradition, compensation and negotiation. The transition of an environmentally sound energy consumption pattern and the improvement of energy efficiency could be carried out by traditional approaches. To claim the damage and offer the accommodation facilities could be settled by compensational approaches. The establishment of regional decentralization on NIMBY facilities could be settled by negotiatory approaches through fair share criteria. The latter proposes 1) 'polluter pays principle', 2) internalization of social cost and benefit on air or water pollution, 3) the behind - the - scene negotiation in a bid to settle a site dispute, 4) and supporting system for peripheral areas

  5. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  6. State Waste Discharge Permit ST-4502 Implementation Plan

    International Nuclear Information System (INIS)

    BROWN, M.J.; LECLAIR, M.D.

    2000-01-01

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements

  7. The Use of Transferable Permits in Transport Policy

    OpenAIRE

    Raux, Charles

    2004-01-01

    http://dx.doi.org/10.1016/j.trd.2004.01.001; International audience; This paper considers potential use of domestic transferable, or tradable, permit systems for the purposes of travel management, especially reducing environmental nuisances. The main arguments for and against the use of permits are analyzed. Secondly two case studies of existing permit systems are examined. The main conclusions are that tradable permits can address greenhouse gas and regional atmospheric pollutant emissions, ...

  8. Analysis of solutes in groundwaters from the Rustler Formation at and near the Waste Isolation Pilot Plant site

    International Nuclear Information System (INIS)

    Robinson, K.L.

    1997-09-01

    Between 1976 and 1986, groundwater samples from more than 60 locations in the vicinity of the Waste Isolation Pilot Plant site were collected and analyzed for a variety of major, minor, and trace solutes. Most of the samples were from the Rustler Formation (the Culebra Dolomite, the Magenta Dolomite, or the zone at the contact between the Rustler and underlying Salado Formations) or the Dewey Lake Red Beds. The analytical data from the laboratories are presented here with accompanying discussions of sample collection methods, supporting field measurements, and laboratory analytical methods. A comparison of four data sets and a preliminary evaluation of the data for the major solutes (Cl - , SO 4 -2 , Na, K, Ca, and Mg) shows that the data for samples analyzed by UNC/Bendix for SNL seem to be the most reliable, but that at some locations, samples representative of the native, unperturbed groundwater have not been collected. At other locations, the water chemistry has apparently changed between sampling episodes

  9. RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report Calendar Year 2012, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, P. M.

    2013-02-21

    This report summarizes the U.S. Environmental Protection Agency (EPA) identification number of each generator from which the Permittee received a waste stream, a description and quantity of each waste stream in tons and cubic feet received at the facility, the method of treatment, storage, and/or disposal for each waste stream, a description of the waste minimization efforts undertaken, a description of the changes in volume and toxicity of waste actually received, any unusual occurrences, and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101, issued 10/17/10.

  10. Oak Ridge Reservation: Annual Site Environmental Report for 2015

    Energy Technology Data Exchange (ETDEWEB)

    Rochelle, James [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Rogers, Ben [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Roche, Paula R. [Y-12 National Security Complex, Oak Ridge, TN (United States); Hughes, Joan [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Coffey, Mike [East Tennessee Technology Park (ETTP), Oak Ridge, TN (United States)

    2016-09-01

    The Oak Ridge Reservation Annual Site Environmental Report is prepared annually and presents summary environmental data to (1) characterize environmental performance, (2) summarize environmental occurrences reported during the year, (3) confirm compliance with environmental standards and requirements, and (4) highlight significant program activities. The report fulfills the requirement contained in DOE Order 231.1A, Environment, Safety and Health Reporting (DOE 2004) that an integrated annual site environmental report be prepared. The results summarized in this report are based on data collected prior to and through 2015. This report is not intended to nor does it present the results of all environmental monitoring associated with the ORR. Data collected for other site and regulatory purposes, such as environmental restoration/remedial investigation reports, waste management characterization sampling data, and environmental permit compliance data, are presented in other documents that have been prepared in accordance with applicable DOE guidance and/or laws and are referenced herein as appropriate. Environmental monitoring on the ORR consists primarily of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring involves the collection and analysis of samples or measurements of liquid and gaseous effluents at the points of release to the environment; these measurements allow the quantification and official reporting of contaminant levels, assessment of radiation and chemical exposures to the public, and demonstration of compliance with applicable standards and permit requirements. Environmental surveillance consists of direct measurements and collection and analysis of samples taken from the site and its environs exclusive of effluents; these activities provide information on contaminant concentrations in air, water, groundwater, soil, foods, biota, and other media. Environmental surveillance data support determinations regarding

  11. Photochemical oxidation of americium(3) in bicarbonate-carbonate solutions saturated with N2O

    International Nuclear Information System (INIS)

    Shilov, V.P.; Yusov, A.B.

    1993-01-01

    The influence of UV radiation on 1.1x10 -4 mol/l Am(3) in bicarbonate-carbonate solutions of sodium and potassium saturated with N 2 O was studied by spectrographic method. In all the cases Am(4) was formed as a primary product. Initial rate of Am(4) accumulation remains stable in solutions up to HCO 3 - or HCO 3 - +CO 3 2- concentration of approximately 1.5 mol/l, but it decreases in case of their higher concentration. In solutions with pH 8.4-10 Am(4) disproportionates at a slow rate and the method suggested permits attaining practically 100% yield of it

  12. Hanford Patrol Academy demolition sites closure plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-30

    The Hanford Site is owned by the U.S. Government and operated by the U.S. Department of Energy, Richland Operations Office. Westinghouse Hanford Company is a major contractor to the U.S. Department of Energy, Richland Operations Office and serves as co-operator of the Hanford Patrol Academy Demolition Sites, the unit addressed in this paper. This document consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3 (Revision 4), and a closure plan for the site. An explanation of the Part A Form 3 submitted with this closure plan is provided at the beginning of the Part A section. This Hanford Patrol Academy Demolition Sites Closure Plan submittal contains information current as of December 15, 1994.

  13. Regional flow and solute transport modeling for site suitability. Part I

    International Nuclear Information System (INIS)

    Rowe, J.; Miller, I.

    1979-12-01

    The nature of regional flow systems in large sedimentary basins will largely determine the effectiveness of regional flow as a barrier to radionuclide escape from deep geologic repositories. The purpose of the work reported herein and the proposed future work is to develop a methodology for evaluating regional flow barriers by using numerical models. The Williston Basin was chosen as an archetype case for the regional modeling study. However, due to the simplified nature of the study, the results are not meant to represent the behavior of a repository actually placed within the Williston Basin. The major components of this Phase I study are: (1) assembly and reduction of available data; (2) formulation of a simplified geohydrologic model; (3) computer simulation of fluid flow; and (4) computer simulation of solute transport. As of this report, the first two items are essentially completed. Computer simulation of fluid flow will require some revision and further study, which will be done in the second phase of this study. Computer simulation of solute transport has been considered only on a very preliminary basis. Important conclusions of this Phase I study are as follows. Assembly and reduction of data require an extensive work effort. Generally, the parameters describing fluid flow are poorly known on a regional basis and those describing solute transport are unknown

  14. Regional flow and solute transport modeling for site suitability. Part I

    Energy Technology Data Exchange (ETDEWEB)

    Rowe, J.; Miller, I.

    1979-12-01

    The nature of regional flow systems in large sedimentary basins will largely determine the effectiveness of regional flow as a barrier to radionuclide escape from deep geologic repositories. The purpose of the work reported herein and the proposed future work is to develop a methodology for evaluating regional flow barriers by using numerical models. The Williston Basin was chosen as an archetype case for the regional modeling study. However, due to the simplified nature of the study, the results are not meant to represent the behavior of a repository actually placed within the Williston Basin. The major components of this Phase I study are: (1) assembly and reduction of available data; (2) formulation of a simplified geohydrologic model; (3) computer simulation of fluid flow; and (4) computer simulation of solute transport. As of this report, the first two items are essentially completed. Computer simulation of fluid flow will require some revision and further study, which will be done in the second phase of this study. Computer simulation of solute transport has been considered only on a very preliminary basis. Important conclusions of this Phase I study are as follows. Assembly and reduction of data require an extensive work effort. Generally, the parameters describing fluid flow are poorly known on a regional basis and those describing solute transport are unknown.

  15. An economic analysis of tradeable emission permits for sulphur dioxide emissions in Europe

    International Nuclear Information System (INIS)

    Kruitwagen, S.

    1996-01-01

    The central theme of this thesis is the analysis of the applicability of tradeable emission permits for cost-effective SO2 reduction in Europe. First, an economic theoretical background is presented based on a literature study. Second, integrated assessment models are presented and compared. One of these models is selected for simulation. Third, a new permit trading systems is developed and analysed by detailed simulations of trading schemes, including their economic and environmental implications. Chapter 2 discusses some general economic aspects of pollution control. Attention is paid to the cost effectiveness of pollution control, to the international dimension of acid rain policy and to the need for cooperation. Some general game theoretic concepts are reviewed. Also attention is paid to the alternative policy instruments for emission control, focusing on tradeable emission permits. The theory of tradeable emission permits is elaborated in Chapter 3. Permit trading for pollutants that are non-uniformly mixing is thoroughly discussed and illustrated by some empirical studies. After discussing both emission permit and deposition permit trading systems, alternative systems of tradeable permits for this kind of pollutants are examined. Two main aspects in examining permit trading systems concern (1) the kind of trading process assumed, involving the distinction between simultaneous multilateral permit trading versus bilateral sequential permit trading, and (2) the initial distribution of emission permits. The thorough discussion on tradeable permits contributes to a better understanding of this policy instrument and sheds light on the implications of permit trading for non-uniformly mixing pollutants. The findings of this chapter indicate that a new permit trading system has to be developed. Chapter 4 describes and compares integrated assessment models for simulation of acid rain control. First, three integrated assessment models for the European acid rain problem

  16. Permit processes for nuclear power. International lessons

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2010-01-01

    The overall objective of this report is to analyze and compare the legal permitting and planning process for (first and foremost) new nuclear power stations in a number of selected countries. In this way the report provides relevant knowledge that could form the basis for discussing the efficiency of various national licensing processes (include the Swedish one). The study builds heavily on the analysis of legal documents and regulations, and addresses both the formal requirements for licensing and territorial planning procedures as well as the issues of public participation and access to justice in the respective countries. In addition to this legal approach, however, we also adopt an investor's perspective on the legislation, i.e., an analysis of the legal rules can influence investment decisions in practice. Furthermore, the study relies largely on a synthesis of previous studies as well as interviews with researchers, electricity companies and government officials in Sweden and abroad. The countries that are compared include Sweden, Finland, France, Canada, Switzerland, Great Britain, USA and South Korea. These include those that currently invest in new nuclear power as well as those who have recently reformed their plant permitting processes. The analysis highlights important differences among the various countries, including issues such as the political influence on the licensing process, the allocation of political power between the national and local levels, means of interacting with regular citizens, and the overall transparency and predictability of the legislation. Some selected practical experiences of the current legislation are also presented. The report first provides a short background to the role and the status of nuclear power in the global energy system, and we then present a rather comprehensive comparison of the permitting processes in the above countries. Each country section comprises a short background, a presentation of the existing

  17. The present state of research on the vitrification of concentrated solutions of fission products (1962)

    International Nuclear Information System (INIS)

    Bonniaud, R.; Sombret, C.

    1961-01-01

    The present report gives the actual point of studies on vitrification of concentrated solutions of fission products. An active cell, giving glasses in crucibles, permitted to study various glass compositions. The leaching rate from the glass raises 1 to 2 10 -7 g of glass/cm 2 /day. Activity loss by volatility during vitrification remains weak and often below 0.1 per cent of total activity. Off gas cleaning is made easier by presence of filter which is compound of granules including iron oxide. After saturation the content of this filter can be melt. Moreover different processes are in experimentation for a more important production. Daily 72 liters of solution containing tracer activity are treated in a continuous calcination and vitrification plant. The loss in 106 Ru is still important and a modification of installation has been necessary. A pot vitrification plant is in study. In order to reduce cost of processing the possibility to pour glass after melting is actuality in study. A production set of very active glass is also in project. (authors) [fr

  18. 21 CFR 172.167 - Silver nitrate and hydrogen peroxide solution.

    Science.gov (United States)

    2010-04-01

    ... SERVICES (CONTINUED) FOOD FOR HUMAN CONSUMPTION (CONTINUED) FOOD ADDITIVES PERMITTED FOR DIRECT ADDITION TO FOOD FOR HUMAN CONSUMPTION Food Preservatives § 172.167 Silver nitrate and hydrogen peroxide solution... intended to be filtered through a silver-containing water filter. (g) Bottled water must meet the quality...

  19. Consolidated Quarterly Report: Number of potential release sites subject to corrective action

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R.; Cochran, John R.

    2017-04-01

    This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent. The 12 sites in the corrective action process are listed in Table I-1.

  20. 40 CFR 71.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 71.5(d). (B) Prompt reporting of deviations from permit requirements, including those attributable to... prompt or otherwise specifies a time frame for reporting deviations, that definition or time frame shall... and air pollution control equipment), practices, or operations regulated or required under the permit...

  1. 40 CFR 71.25 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... such reports; and (ii) Prompt reporting of any deviations from permit requirements, including those... “prompt” in the permit for each situation and will do so in relation to the degree and type of deviation... reasonable times any facilities, equipment (including monitoring and air pollution control equipment...

  2. 40 CFR 144.51 - Conditions applicable to all permits.

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.51 Conditions applicable... permit. Any permit noncompliance constitutes a violation of the Safe Drinking Water Act and is grounds... denial of a permit renewal application; except that the permittee need not comply with the provisions of...

  3. Description of radiological problems at inactive uranium mill sites and formerly utilized MED/AEC sites

    International Nuclear Information System (INIS)

    Jacobs, D.G.; Dickson, H.W.

    1979-02-01

    During the early years of development of the nuclear program in the United States, more than a hundred sites were used by the Manhattan Engineer District (MED), and the U.S. Atomic Energy Commission (AEC), and/or its uranium suppliers. Many of these sites are no longer used for such activities, but in many cases, the real estate remains contaminated with radioactivity and can be a potential source of exposure to members of the general public. In addition, 22 inactive uranium mill tailings sites exist in the western part of the United States. Radioactive contamination conditions range from slight contamination on the surfaces of buildings and equipment to extensive contamination of the subsoil. The Department of Energy is conducting a program to assure that adequate precautions are taken in the management of these properties to provide the cost-effective protection of public health while permitting further use of land and other resources. Several issues which should be considered in the development of an effective policy for long-term management of such properties are identified

  4. Description of radiological problems at inactive uranium mill sites and formerly utilized MED/AEC sites

    Energy Technology Data Exchange (ETDEWEB)

    Jacobs, D.G.; Dickson, H.W.

    1979-02-01

    During the early years of development of the nuclear program in the United States, more than a hundred sites were used by the Manhattan Engineer District (MED), and the U.S. Atomic Energy Commission (AEC), and/or its uranium suppliers. Many of these sites are no longer used for such activities, but in many cases, the real estate remains contaminated with radioactivity and can be a potential source of exposure to members of the general public. In addition, 22 inactive uranium mill tailings sites exist in the western part of the United States. Radioactive contamination conditions range from slight contamination on the surfaces of buildings and equipment to extensive contamination of the subsoil. The Department of Energy is conducting a program to assure that adequate precautions are taken in the management of these properties to provide the cost-effective protection of public health while permitting further use of land and other resources. Several issues which should be considered in the development of an effective policy for long-term management of such properties are identified.

  5. 78 FR 6817 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-01-31

    ... Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a... ENVIRONMENTAL PROTECTION AGENCY [FRL 9774-6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY...

  6. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit is...

  7. SITE-2, Power Plant Siting, Cost, Environment, Seismic and Meteorological Effects

    International Nuclear Information System (INIS)

    Frigerio, N.A.; Habegger, L.J.; King, R.F.; Hoover, L.J.; Clark, N.A.; Cobian, J.M.

    1977-01-01

    1 - Description of problem or function: SITE2 is designed to (1) screen candidate energy facility sites or areas within an electric utility region, based on the region's physical and socioeconomic attributes, the planned facility's characteristics, and impact assessments, and (2) evaluate the cumulative regional impacts associated with alternate energy supply options and inter-regional energy import/export practices, specifically, comparison of different energy technologies and their regional distribution in clustered or dispersed patterns. 2 - Method of solution: The SITE2 methodology is based on the quantification of three major site-related vectors. A cost vector is determined which identifies site-specific costs, such as transmission costs, cooling costs as related to water availability, and costs of specific controls needed to protect the surrounding environment. An impact vector is also computed for each potential site, using models of health and environmental impacts incurred in areas adjacent to the site. Finally, a site attribute vector is developed which reflects such characteristics as population, seismic conditions, meteorology, land use, and local ecological systems. This vector can be used to eliminate certain sites because of their inability to satisfy specific constraints. These three vectors can be displayed as density maps and combined in a simple overlay approach, similar to that developed by I. L. McHarg in reference 2, to identify candidate sites. Alternatively, the vector elements can be computationally combined into a weighted sum to obtain quantitative indicators of site suitability

  8. SITE-2, Power Plant Siting, Cost, Environment, Seismic and Meteorological Effects

    Energy Technology Data Exchange (ETDEWEB)

    Frigerio, N A [Environmental Impact Studies, Argonne National Laboratory 9700 South Cass Avenue, Argonne, Illinois 60439 (United States); Habegger, L J; King, R F; Hoover, L J [Energy and Environmental Systems Division, Argonne National Laboratory 9700 South Cass Avenue, Argonne, Illinois 60439 (United States); Clark, N A [Applied Mathematics Division, Argonne National Laboratory, 9700 South Cass Avenue, Argonne, Illinois 60439 (United States); Cobian, J M [Northwestern University, Evanston, Illinois 60201 (United States)

    1977-08-01

    1 - Description of problem or function: SITE2 is designed to (1) screen candidate energy facility sites or areas within an electric utility region, based on the region's physical and socioeconomic attributes, the planned facility's characteristics, and impact assessments, and (2) evaluate the cumulative regional impacts associated with alternate energy supply options and inter-regional energy import/export practices, specifically, comparison of different energy technologies and their regional distribution in clustered or dispersed patterns. 2 - Method of solution: The SITE2 methodology is based on the quantification of three major site-related vectors. A cost vector is determined which identifies site-specific costs, such as transmission costs, cooling costs as related to water availability, and costs of specific controls needed to protect the surrounding environment. An impact vector is also computed for each potential site, using models of health and environmental impacts incurred in areas adjacent to the site. Finally, a site attribute vector is developed which reflects such characteristics as population, seismic conditions, meteorology, land use, and local ecological systems. This vector can be used to eliminate certain sites because of their inability to satisfy specific constraints. These three vectors can be displayed as density maps and combined in a simple overlay approach, similar to that developed by I. L. McHarg in reference 2, to identify candidate sites. Alternatively, the vector elements can be computationally combined into a weighted sum to obtain quantitative indicators of site suitability.

  9. Presentation of safety after closure of the repository for spent nuclear fuel. Main report of the project SR-Site. Part III

    International Nuclear Information System (INIS)

    2011-01-01

    The purpose of the safety assessment SR-Site is to investigate whether a safe repository for spent nuclear fuel by KBS-3 type can be constructed at Forsmark in Oesthammar in Sweden. The location of the Forsmark has been selected based on results of several surveys from surface conditions at depth in Forsmark and in Laxemar in Oskarshamn. The choice of location is not justified in SR-Site Report, but in other attachments to SKB's permit applications. SR-Site Report is an important part of SKB's permit applications to construct and operate a repository for spent nuclear fuel at Forsmark in Oesthammar. The purpose of the report in the applications is to show that a repository at Forsmark is safe after closure

  10. Presentation of safety after closure of the repository for spent nuclear fuel. Main report of the project SR-Site. Part I

    International Nuclear Information System (INIS)

    2011-01-01

    The purpose of the safety assessment SR-Site is to investigate whether a safe repository for spent nuclear fuel by KBS-3 type can be constructed at Forsmark in Oesthammar in Sweden. The location of the Forsmark has been selected based on results of several surveys from surface conditions at depth in Forsmark and in Laxemar in Oskarshamn. The choice of location is not justified in SR-Site Report, but in other attachments to SKB's permit applications. SR-Site Report is an important part of SKB's permit applications to construct and operate a repository for spent nuclear fuel at Forsmark in Oesthammar. The purpose of the report in the applications is to show that a repository at Forsmark is safe after closure

  11. 50 CFR 21.41 - Depredation permits.

    Science.gov (United States)

    2010-10-01

    ... PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Control of Depredating and Otherwise Injurious Birds § 21.41... control purposes. No permit is required merely to scare or herd depredating migratory birds other than... other means of concealment, decoys, duck calls, or other devices to lure or entice birds within gun...

  12. WIPP 2004 Site Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2005-09-30

    The mission of Waste Isolation Pilot Plant (WIPP) is to safely and permanently dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States (U.S.). In 2004, 8,839 cubic meters (m3) of TRU waste were emplaced at WIPP. From the first receipt of waste in March 1999 through the end of 2004, 25,809 m3 of TRU waste had been emplaced at WIPP. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of WIPP environmental resources. DOE Order 450.1, Environmental Protection Program; DOE Order 231.1A, Environment, Safety, and Health Reporting; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2004 Site Environmental Report (SER) summarizes environmental data from 2004 that characterize environmental management performance and demonstrate compliance with applicable federal and state regulations. This report was prepared in accordance with DOE Order 231.1A, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2004 (DOE, 2005). The order and the guidance require that DOE facilities submit an annual SER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) further requires that the SER be provided to the New Mexico Environment Department (NMED).

  13. WIPP 2004 Site Environmental Report

    International Nuclear Information System (INIS)

    2005-01-01

    The mission of Waste Isolation Pilot Plant (WIPP) is to safely and permanently dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States (U.S.). In 2004, 8,839 cubic meters (m3) of TRU waste were emplaced at WIPP. From the first receipt of waste in March 1999 through the end of 2004, 25,809 m3 of TRU waste had been emplaced at WIPP. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of WIPP environmental resources. DOE Order 450.1, Environmental Protection Program; DOE Order 231.1A, Environment, Safety, and Health Reporting; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2004 Site Environmental Report (SER) summarizes environmental data from 2004 that characterize environmental management performance and demonstrate compliance with applicable federal and state regulations. This report was prepared in accordance with DOE Order 231.1A, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2004 (DOE, 2005). The order and the guidance require that DOE facilities submit an annual SER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) further requires that the SER be provided to the New Mexico Environment Department (NMED).

  14. Groundwater flow modelling at the Olkiluoto site, Finland

    International Nuclear Information System (INIS)

    Loefman, J.

    1996-01-01

    Preliminary site investigations for spent fuel disposal has been carried out at the Olkiluoto site, Finland. During the investigations high salt concentrations were measured in the groundwater samples deep in the bedrock. In this study, the groundwater flow is analyzed at Olkiluoto taking into account the effects of salinity. The transient simulations are performed by solving coupled and non-linear partial differential equations describing the flow and solute transport. A site-specific simulation model for flow and transport is developed on the basis of the field investigations. The simulations are carried out for a period that started when the highest hills at Olkiluoto rose above sea level. The simulation period continues until the present day. The results of the coupled simulations were strongly dependent on the poorly known initial salinity distribution in the solution domain. The DP approximation together with the EC approximation proved to be a useful complementary approach when simulating solute transport in a fractured rock mass. The simulations also confirm the assumption that the realistic simulation of groundwater flow at Olkiluoto requires taking into account the effects of salinity

  15. 77 FR 34061 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2012-06-08

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  16. 78 FR 27255 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-05-09

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  17. 78 FR 56922 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-09-16

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  18. 2010 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Mike lewis

    2011-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2009, through October 31, 2010. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of special compliance conditions • Discussion of the facility’s environmental impacts. During the 2010 permit year, approximately 2.2 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Area Sewage Treatment plant.

  19. Political and Economic Scope for Permit Markets in Europe

    DEFF Research Database (Denmark)

    Svendsen, Gert Tinggaard

    1999-01-01

    (organized polluters) due to the possibility of a free, initial distribution (grand-fathering). As such, a mix of green taxes (in relation to non-organized interests) and grandfathered permit markets (in relation to organized interests) should be considered in the search for cost-effective and politically...... of permit markets in the US. Therefore, the policy recommendation for e.g. CO2 reduction in Europe is to apply taxation in relation to large and non-organized groups only, such as households and the transportation sector. A permit market, on the other hand, is politically more attrac-tive to the industry...

  20. Coping with EPA's new petroleum industry storm water permits

    International Nuclear Information System (INIS)

    Veal, S.C.; Whitescarver, J.P.

    1994-01-01

    The United States Environmental Protection Agency has just released for public comment its so-called multi-sector industry specific storm water permit. This permit -- developed in response to the 730 group storm water permit applications submitted in 1992 to EPA -- proposes the establishment of specific runoff sampling and facility design requirements for at least two petroleum industry sectors. This proposed permit establishes specific conditions for the oil and gas extraction section (SIC group 13) and for lubricant manufacturers (SIC 2992). Permit conditions are also established for allied industrial sectors such as the chemical, transportation and asphalt materials industries. By most standards, the proposed permit is much tougher than EPA's baseline general permit for storm water discharges which was released in September of 1992. For example, under the proposal, most industries are required to perform periodic storm water sampling. EPA has also established storm water effluent and performance standards for several industrial categories. This paper will discuss the petroleum industry specific conditions of the new permit. The paper will also discuss the results of the industry-wide storm water sampling efforts undertaken by more than 300 oil patch facilities across the country. In particular, sampling results will be discussed in the context to the permit conditions proposed by EPA. The paper will also discuss strategies for dealing with the new permits

  1. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  2. Top-MOX fuel solution: strategies, challenges, opportunities

    International Nuclear Information System (INIS)

    Breitenstein, P.; Vo Van, V.

    2014-01-01

    TOP-MOX is a nuclear fuel solution and product developed by AREVA and successfully implemented in Europe. It allows utilities burning plutonium (instead of enriched uranium) even when this plutonium is not stemming from own reprocessed used fuel - that is third party plutonium. The important challenges for utilities along with TOP-MOX implementation are legal/patrimonial Pu-ownership issues and general economical aspects. Available sponsorship of such plutonium permits UO2 competitive market prices. For new MOX customers licensing and technical aspects come along. Further AREVA proposes a flexible solution which is called 'TOP-MOX pre-cycling'. This involves making available third party plutonium for fuel fabrication and reactor use pending the utilities' final strategic fuel cycle decision. The paper gives insight into and analyses the impacts of allowing customers the implementation of a TOP-MOX program with focus on Pu-ownership, economics, technical and legal aspects as well as the impact on used MOX management and final waste management. (authors)

  3. Evaluation of neutralization treatment processes and their use for uranium tailings solutions

    International Nuclear Information System (INIS)

    Sherwood, D.R.; Opitz, B.E.; Serne, R.J.

    1985-01-01

    The potential for groundwater contamination from the typically acidic mill wastes that are disposed of in tailings impoundments is of primary concern at uranium mill sites in the US. Solution-treatment processes provide a system for limiting the environmental impact from acidic seepage. Treatment of uranium tailings solutions from evaporation ponds, underdrains, and surface seeps could aid in decommissioning active sites or be used as an emergency measure to avert possible uncontrolled discharges. At present, neutralization processes appear to be best suited for treating uranium mill tailings solution because they can, at a reasonable cost, limit the solution concentration of many contaminants and thus reduce the potential for groundwater contamination. However, the effectiveness of the neutralization process depends on the reagent used as well as the chemistry of the waste stream. This article provides a description of neutralization processes, an assessment of their performance on acidic uranium tailings leachates, and recommendations for their use at US uranium mill sites

  4. 34 CFR 395.35 - Terms of permit.

    Science.gov (United States)

    2010-07-01

    ..., periodicals, publications, confections, tobacco products, foods, beverages, chances for any lottery authorized... PROPERTY Federal Property Management § 395.35 Terms of permit. Every permit shall describe the location of...

  5. Report on the Watershed Monitoring Program at the Paducah Site January-December 1998

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A.; Peterson, M.J.; Ryon, M.G.; Southworth, G.R.

    1999-03-01

    Watershed Monitoring of Big Bayou and Little Bayou creeks has been conducted since 1987. The monitoring was conducted by the University of Kentucky between 1987 and 1991 and by staff of the Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) from 1991 to present. The goals of monitoring are to (1) demonstrate that the effluent limitations established for DOE protect and maintain the use of Little Bayour and Big Bayou creeks for frowth and propagation of fish and other aquatic life, (2) characterize potential environmental impacts, and (3) document the effects of pollution abatement facilities on stream biota. The watershed (biological) monitoring discussed in this report was conducted under DOE Order 5400.1, General Environmental Protection Program. Future monitoring will be conducted as required by the Kentucky Pollutant Discharge Elimination System (KPDES) permit issued to the Department of Energy (DOE) in March 1998. A draft Watershed Monitoring Program plan was approved by the Kentucky Division of Water and will be finalized in 1999. The DOE permit also requires toxicity monitoring of one continuous outfall and of three intermittent outfalls on a quarterly basis. The Watershed Monitoring Program for the Paducah Site during calendar year 1998 consisted of three major tasks: (1) effluent toxicity monitoring, (2) bioaccumulation studies, and (3) ecological surveys of fish communities. This report focuses on ESD activities occurring from january 1998 to December 1998, although activities conducted outside this time period are included as appropriate.

  6. A comparison of taxes and tradable permits in national climate policy

    Energy Technology Data Exchange (ETDEWEB)

    Holtsmark, Bjart J.

    1999-11-01

    This article discusses domestic climate policy design in a country that has made a binding commitment to the Kyoto Protocol but at the same time want to limit the number of industry shutdowns that follows from the policy. It is furthermore considered how public budget constraints might affect climate policies. The similarities between an optionally designed taxation regime and a domestic tradable permit regime that is integrated into the international permit market are brought into focus. The similarities presuppose a greenhouse gas tax that fluctuates in accordance with the international permit price. It is argued that climate policy can generate double dividends but that the allocation of free permits reduces these dividends. It is concluded that some organisations promotion of systems tradable permits with distribution of permits free of charge as an alternative to carbon taxes must be understood from their effect on income distribution. 17 refs

  7. 7 CFR 330.208 - Courtesy permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Courtesy permits. 330.208 Section 330.208 Agriculture... PRODUCTS; GARBAGE Movement of Plant Pests § 330.208 Courtesy permits. The Deputy Administrator may issue... subject to regulation under the Plant Protection Actor any other act, as a courtesy to facilitate movement...

  8. 75 FR 2560 - Issuance of Permits

    Science.gov (United States)

    2010-01-15

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R9-IA-2010-N006] [96300-1671-0000-P5] Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of issuance of permits..., 2009 PH.D, Department of 16, 2009. Cardiology Children's Hospital. Dated: January 8, 2010. Brenda Tapia...

  9. The ANCLI White Paper on Local Governance of Nuclear Sites

    International Nuclear Information System (INIS)

    Delalonde, Jean-Claude; Demet, Michel; Gadbois, Serge; Heriard Dubreuil, Gilles

    2006-01-01

    local community and the site, without being constrained by a narrow legal or administrative framework. The production of different types of waste and their management over the short, medium and long term is a problem that will affect all communities local to nuclear sites from now on. Whatever solution is arrived at (transmutation, storage or disposal) waste management sites will be a fact of life for the medium to long term. Local Commissions must operate at these sites, monitoring them and providing information. As a national body representing local stakeholders on nuclear issues, ANCLI is particularly alert to the problems of waste management and the importance of developing new solutions. It supports a coherent strategy of waste management, implemented so as to avoid storage in unsafe conditions or locations prejudicial to the interests of the local population. It aims to foster democratic debate on this subject by providing information to illuminate the issues and by encouraging the Government to set up long term structures which will engage future generations in governance decisions

  10. 75 FR 4136 - Pipeline Safety: Request To Modify Special Permit

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0377] Pipeline Safety: Request To Modify Special Permit AGENCY: Pipeline and Hazardous... coating on its gas pipeline. DATES: Submit any comments regarding this special permit modification request...

  11. 32 CFR 552.90 - Permit office.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Permit office. 552.90 Section 552.90 National... CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Fort Lewis Land Use Policy § 552.90 Permit office... non-training acess to the range complex. The office is open 0700-1900 hours, seven days a week, for...

  12. The role of emission permits and the uncertainty of a market power on the wholesale electricity markets. The capacity retention strategy

    International Nuclear Information System (INIS)

    Rousse, O.

    2008-01-01

    The wholesale electricity markets are theoretically inherently incomplete and imperfectly competitive. This aspect is confirmed by the various empirical demonstrations of horizontal market power exercising by the capacity retention strategy. In this article, we focus on the impact of implementing an emission permit market for this type of strategy. We show that under some circumstances, the existence of emission permits can provide additional incentives to electricity producers wanting to withhold capacity. Our thinking relies partly on the concept that uncertain of prices and future needs in terms of emission permits, firms can be encouraged to retain more permits in their portfolio to ensure additional flexibility and achieve high profits in the future. (author)

  13. Nuclear Energy Center study. Phase II. Site suitability analysis. Final report

    International Nuclear Information System (INIS)

    Fellows, W.S.; Sharp, J.M.; Benator, B.I.

    1978-06-01

    A site screening study was conducted to identify a site or sites for detailed, site-specific study as a nuclear energy center. Using technical criteria of water requirements, geotechnical constraints, and projected load center and transmission considerations as well as environmental and institutional considerations, five potential study sites in the State of South Carolina were identified, evaluated against established criteria, and ranked according to their acceptability as potential nuclear energy center study sites. Consideration of what is ''representative'' of a site as well as the ranking score was factored into site recommendations, since the site deemed easiest to license and permit may not be the most desirable site for future study of the technical and institutional feasibility and practicality of a specific site. The sites near Lake Hartwell and the Savannah River Plant (SRP) of the Department of Energy were selected as potential study sites after consideration of the above criteria. Because the Lake Hartwell site offers the opportunity to consider institutional issues which may be more representative of other possible NEC sites, it is recommended that the Lake Hartwell site be studied to establish the feasibility and practicality of the nuclear energy concept on a site-specific basis

  14. Environmental site characterization and remediation at Lawrence Livermore National Laboratory Site 300

    International Nuclear Information System (INIS)

    Lamarre, A.L.; Ferry, R.A.

    1992-04-01

    Lawrence Livermore National Laboratory (LLNL) is a research and development laboratory owned by the US Department of Energy (DOE) and operated by the University of California. The Laboratory operates its Site 300 test facility in support of DOE's national defense programs. In support of activities, at the 300 Site numerous industrial fluids are used and various process or rinse waters and solid wastes are produced. Some of these materials are hazardous by current standards. HE rinse waters were previously discharged to inlined lagoons; they now are discharged to a permitted Class II surface impoundment Solid wastes have been deposited in nine landfills. Waste HE compounds are destroyed by open burning at a burn pit facility. As a result of these practices, environmental contaminants have been released to the soil and ground water

  15. Geothermal Well Site Restoration and Plug and Abandonment of Wells

    Energy Technology Data Exchange (ETDEWEB)

    Rinehart, Ben N.

    1994-08-01

    A report is presented on the final phase of an energy research program conducted by the U.S. Department of Energy (DOE) involving two geothermal well sites in the State of Louisiana-the Gladys McCall site and the Willis Hulin site. The research program was intended to improve geothermal technology and to determine the efficacy of producing electricity commercially from geopressured resource sites. The final phase of the program consisted of plug and abandonment (P&A) of the wells and restoration of the well sites. Restoration involved (a) initial soil and water sampling and analysis; (b) removal and disposal of well pads, concrete, utility poles, and trash; (c) plugging of monitor and freshwater wells; and (d) site leveling and general cleanup. Restoration of the McCall site required removal of naturally occurring radioactive material (NORM), which was costly and time-consuming. Exhibits are included that provide copies of work permits and authorizations, P&A reports and procedures, daily workover and current conditions report, and cost and salvage reports. Site locations, grid maps, and photographs are provided.

  16. 40 CFR 60.4123 - Hg budget permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit contents and term. 60... Coal-Fired Electric Steam Generating Units Permits § 60.4123 Hg budget permit contents and term. (a) Each Hg Budget permit will contain, in a format prescribed by the permitting authority, all elements...

  17. The European Union's potential for strategic emissions trading through permit sales contracts

    International Nuclear Information System (INIS)

    Eyckmans, Johan; Hagem, Cathrine

    2011-01-01

    Strategic market behavior by permit sellers will harm the European Union (EU) as it is expected to become a large net buyer of permits in a follow-up agreement to the Kyoto Protocol. In this paper, we explore how the EU could benefit from making permit trade agreements with non-EU countries. These trade agreements involve permit sales requirement, complemented by a financial transfer from the EU to the other contract party. Such agreements would enable the EU to act strategically in the permit market on behalf of its member states, although each member state is assumed to behave as a price taker in the permit market. Using a stylized numerical simulation model, we show that an appropriately designed permit trade agreement between the EU and China could significantly cut the EU's total compliance cost. This result is robust for a wide range of parameterizations of the simulation model. (author)

  18. 25 CFR 166.100 - What special tribal policies will we apply to permitting on Indian agricultural lands?

    Science.gov (United States)

    2010-04-01

    ... preferences in permits advertised for bid under § 166.221 of this part, by allowing prospective Indian operators to match the highest responsible bid (unless the tribal law or leasing policy specifies some other... THE INTERIOR LAND AND WATER GRAZING PERMITS Tribal Policies and Laws Pertaining to Permits § 166.100...

  19. Decontamination of soil from the research reactor site

    International Nuclear Information System (INIS)

    Won, H. Z.; Kim, K. N.; Choi, W. K.; Jeong, J. H.; Oh, W. J.

    2002-01-01

    The two research reactors (TRIGA MARK II and III) in Korea are to be decommissioned in the near future. When the reactors are completely dismantled, the site may remain contaminated due to the long period of operation. We assume that the site is radioactively contaminated by Co-60. Soils gathered from the research reactor site were artificially contaminated with Co 2+ ion. The desorption characteristics of Co 2+ ion from the soil surface by citric acid solution were investigated. Decontamination performances of citric acid and EDTA on soil stored in the radioactive waste drums was examined. The feasibility test of recycling the citric acid was also performed. We concluded that the radioactive waste volume could be reduced significantly by soil washing with a citric acid solution

  20. Solution-based targeted genomic enrichment for precious DNA samples

    Directory of Open Access Journals (Sweden)

    Shearer Aiden

    2012-05-01

    Full Text Available Abstract Background Solution-based targeted genomic enrichment (TGE protocols permit selective sequencing of genomic regions of interest on a massively parallel scale. These protocols could be improved by: 1 modifying or eliminating time consuming steps; 2 increasing yield to reduce input DNA and excessive PCR cycling; and 3 enhancing reproducible. Results We developed a solution-based TGE method for downstream Illumina sequencing in a non-automated workflow, adding standard Illumina barcode indexes during the post-hybridization amplification to allow for sample pooling prior to sequencing. The method utilizes Agilent SureSelect baits, primers and hybridization reagents for the capture, off-the-shelf reagents for the library preparation steps, and adaptor oligonucleotides for Illumina paired-end sequencing purchased directly from an oligonucleotide manufacturing company. Conclusions This solution-based TGE method for Illumina sequencing is optimized for small- or medium-sized laboratories and addresses the weaknesses of standard protocols by reducing the amount of input DNA required, increasing capture yield, optimizing efficiency, and improving reproducibility.

  1. 32 CFR 767.8 - Requests for amendments or extensions of active permits.

    Science.gov (United States)

    2010-07-01

    ... application may be given in lieu of a new application, provided the scope of work does not change... MISCELLANEOUS RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER... extensions of active permits. (a) Requests for amendments to active permits (e.g., a change in study design...

  2. INTERCULTURAL MISUNDERSTANDINGS: CAUSES AND SOLUTIONS

    Directory of Open Access Journals (Sweden)

    Майкл Б Хиннер

    2017-12-01

    Full Text Available Intercultural misunderstandings involve a number of complex causes which can easily escalate into conflicts. Since conflicts are also complex, it is not easy to find solutions because there is no one solution for all problems. Systems Theory, transdisciplinarity, and the social ecological model take a holistic approach in investigating complex phenomena. They permit the creation of a theoretical framework based on previous empirical research and theories across scientific disciplines to identify the relevant elements of complex phenomena and to understand the interrelationship of these elements. Intercultural misunderstandings and conflicts are very complex phenomena because they include culture, perception, identity, ethnocentrism, relationships, trust building and conflict management as well as intercultural commu-nication competence which entails cognition, metacognition, and social metacognition. Since most em-pirical studies focus on isolated, individual elements in specific contexts, this article describes the theoretical framework of how the various findings and theories developed in different scientific disciplines can be used to form a cohesive framework to help circumvent intercultural misunderstandings and conflicts. In so doing, it follows the general principles of Systems Theory, transdisciplinarity, and the social ecological model.

  3. Hydroelectric Generating Facilities General Permit ...

    Science.gov (United States)

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  4. 21 CFR 1312.23 - Issuance of export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Issuance of export permit. 1312.23 Section 1312.23... CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.23 Issuance of export permit. (a) The... regulation in § 1312.30 of this part be exported only pursuant to the issuance of an export permit. The...

  5. Architecting Web Sites for High Performance

    Directory of Open Access Journals (Sweden)

    Arun Iyengar

    2002-01-01

    Full Text Available Web site applications are some of the most challenging high-performance applications currently being developed and deployed. The challenges emerge from the specific combination of high variability in workload characteristics and of high performance demands regarding the service level, scalability, availability, and costs. In recent years, a large body of research has addressed the Web site application domain, and a host of innovative software and hardware solutions have been proposed and deployed. This paper is an overview of recent solutions concerning the architectures and the software infrastructures used in building Web site applications. The presentation emphasizes three of the main functions in a complex Web site: the processing of client requests, the control of service levels, and the interaction with remote network caches.

  6. Guide to Permitting Hydrogen Motor Fuel Dispensing Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl [National Renewable Energy Lab. (NREL), Golden, CO (United States); Buttner, William [National Renewable Energy Lab. (NREL), Golden, CO (United States); Burgess, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-03-28

    The purpose of this guide is to assist project developers, permitting officials, code enforcement officials, and other parties involved in developing permit applications and approving the implementation of hydrogen motor fuel dispensing facilities. The guide facilitates the identification of the elements to be addressed in the permitting of a project as it progresses through the approval process; the specific requirements associated with those elements; and the applicable (or potentially applicable) codes and standards by which to determine whether the specific requirements have been met. The guide attempts to identify all applicable codes and standards relevant to the permitting requirements.

  7. Innovative options for structuring oil and gas leases and exploration permits on Aboriginal lands

    International Nuclear Information System (INIS)

    Douglas, W.; Wells, M.

    1999-01-01

    Operations in the oil and gas industry that involve exploration and production on Aboriginal lands are definitely more complex than operations on provincial Crown lands and there is clearly a need to meet different objectives. There are many good reasons for a petroleum exploration company to make a risk investment on First Nation lands, and the governing legislation permits considerable latitude in the terms of exploration permits and production leases. Indian Oil and Gas Canada will have to approve any agreement negotiated with a First Nation, so they must be made part of the deal-making process. It is important to recognize the responsibility a company has as a partner of a First Nation to help them achieve the maximum benefits from this non-renewable resource. Aspects considered include: the participants and their needs; terms and conditions in oil and gas leases; innovative compensation models; marketing the royalty share; equity participation, and managing exploration and development risk

  8. Rosebud Casino and Hotel NPDES Proposed Permit

    Science.gov (United States)

    Indian Country, Minor Permit, proposed permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  9. Thermodynamic study of the adsorption of chromium ions from aqueous solution on waste corn cobs material

    Directory of Open Access Journals (Sweden)

    Rafael A. Fonseca-Correa

    2014-12-01

    Full Text Available The paper shows the results of a study obtaining activated carbon from corn cobs and determining its use as an adsorbent for the removal of Cr3+ from aqueous solutions. The finely ground precursor was subjected to pyrolysis at 600 and 900 °C in a nitrogen atmosphere and chemical activation with H2O2 and HNO3. The effects of pyrolysis conditions and activation method on the physicochemical properties of the materials obtained were tested. The samples were characterised chemically and texturally. Were obtained microporous activated carbons of well-developed surface area varying from 337 to 1213 m2/g and exhibited differences acid-base character of the surface. The results obtained shows that a suitable good option of the activation procedure for corncobs permits the production of economic adsorbents with high sorption capacity for Cr3+ from aqueous solutions. A detailed study of immersion calorimetry was performed with carbons prepared from corn cobs to establish possible relationships with these materials between the enthalpies of immersion and textural and chemical parameters.

  10. Permitting issues in Virginia

    International Nuclear Information System (INIS)

    Kennel, R.P.

    1992-01-01

    As background, LG and E Development Corporation (formerly Hadson) has successfully put 16 Qualifying Facilities in the ground over the past 9 years in California, Maine, Virginia, and North Carolina. Each of these qualifying facilities has had some environmental innovative first, so there is no apology for the authors' environmental credentials. In Virginia, there are four identical 60 MW stoker coal cogeneration projects in Southampton County, Altavista, Hopewell, and -lastly-Buena Vista. The Buena Vista cogeneration project becomes the exception that proves the permitting rules. It has been in the permitting process for over 4 years; and despite being the cleanest coal project ever considered east of the Mississippi (design at 0.1 lbs/MMBtu for both So 2 and NO x ), it has suffered serous consequences from permitting delays and BACT ratcheting. As a simple comparison of importance, the Virginia Power Mt. Storm coal power facility emits approximately 150,000 tons of So 2 per year, while the Buena Vista project will actually emit approximately 150 tons of SO 2 per year (not including 1,500' tons of purchased SO 2 offsets). Both are similar distances from the Shenandoah National Park which has been the primary environmental point of concern in Virginia

  11. 24 CFR 242.47 - Insured advances for building components stored off-site.

    Science.gov (United States)

    2010-04-01

    ... HOUSING ACT AND OTHER AUTHORITIES MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.47 Insured advances... only for components stored off-site in a quantity required to permit uninterrupted installation at the...

  12. In situ adsorption of bovine submaxillary mucin at the mica/aqueous solution interface

    International Nuclear Information System (INIS)

    Perez, E.; Proust, J.E.; Baszkin, A.; Boissonnade, M.M.

    1984-01-01

    An in situ adsorption measurement method at the mica/protein solution interface is described. An apparatus especially constructed for this purpose permits direct and continuous measurement of total adsorption (reversible and irreversible) of 14 C-labelled proteins. Bovine submaxillary mucin (BSM), extracted from salivary glands, was acetylated with (CH 3 14 CO) 2 O. The results show the increase of BSM adsorbed on mica surfaces with its concentration in solution and adsorption time. Pseudo plateaux are obtained for all concentrations studied, indicating the formation of thick layers. The loosely bound fraction of adsorbed mucin is proportional to the bulk concentration in solution. The amount of BSM adsorbed increases in the neighbourhood of the isoelectric point of BSM (pH 3). (Auth.)

  13. Tradable CO{sub 2} permits in Danish and European energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Varming, S.; Vesterdal, M. [ELSAMPROJEKT A/S (Denmark); Boerre Eriksen, P. [Eltra I/S (Denmark); Grohnheit, P.E.; Nielsen, L. [RISOe (Denmark); Tinggaard Svendsen, G. [Handelshoejskolen i Aarhus (Denmark)

    2000-08-01

    This report presents the results of the project 'Tradable CO{sub 2} permits in Danish and European energy policy'. The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operation between Elsamprojekt A/S (project manager), Risoe National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard to the construction of a tradable CO{sub 2} permit market as well as proposing a suitable design for a tradable CO{sub 2} permit market for the energy sector in the EU. Experience from the tradable S{sub O}2 permit market in the US is taken into consideration as well. To present an overview of price estimates of CO{sub 2} and greenhouse gas permits in different models as well as discussing the assumptions leading to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices is analysed. To analyse the connection between CO{sub 2} permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat and power and renewables. In addition, the short-term effects on CO{sub 2} emissions and electricity trade of introducing tradable CO{sub 2} permit with limited coverage (i.e. a national system) as well as complete coverage (i.e. including all the countries) in the Nordic electricity system are analysed. (au)

  14. Tradable CO{sub 2} permits in Danish and European energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Varming, S; Vesterdal, M [ELSAMPROJEKT A/S (Denmark); Boerre Eriksen, P [Eltra I/S (Denmark); Grohnheit, P E; Nielsen, L [RISOe (Denmark); Tinggaard Svendsen, G [Handelshoejskolen i Aarhus (Denmark)

    2000-08-01

    This report presents the results of the project 'Tradable CO{sub 2} permits in Danish and European energy policy'. The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operation between Elsamprojekt A/S (project manager), Risoe National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard to the construction of a tradable CO{sub 2} permit market as well as proposing a suitable design for a tradable CO{sub 2} permit market for the energy sector in the EU. Experience from the tradable S{sub O}2 permit market in the US is taken into consideration as well. To present an overview of price estimates of CO{sub 2} and greenhouse gas permits in different models as well as discussing the assumptions leading to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices is analysed. To analyse the connection between CO{sub 2} permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat and power and renewables. In addition, the short-term effects on CO{sub 2} emissions and electricity trade of introducing tradable CO{sub 2} permit with limited coverage (i.e. a national system) as well as complete coverage (i.e. including all the countries) in the Nordic electricity system are analysed. (au)

  15. Docking and molecular dynamics studies of peripheral site ligand–oximes as reactivators of sarin-inhibited human acetylcholinesterase

    NARCIS (Netherlands)

    Almeida, J.S.F.D. de; Cuya Guizado, T.R.; Guimarães, A.P.; Ramalho, T.C.; Gonçalves, A.S.; Koning, M.C. de; França, T.C.C.

    2016-01-01

    In the present work, we performed docking and molecular dynamics simulations studies on two groups of long-tailored oximes designed as peripheral site binders of acetylcholinesterase (AChE) and potential penetrators on the blood brain barrier. Our studies permitted to determine how the tails anchor

  16. A game-theoretical model for selecting a site of non-preferred waste facilities

    International Nuclear Information System (INIS)

    Kim, Seong Ho; Kim, Tae Woon

    2006-01-01

    In the present work, a game-theoretic model (GTM) as a tool of conflict analysis is proposed for multiplayer multicriteria decision-making problems in a conflict situation. The developed GTM is used for obtaining the most possible resolutions in the conflict among multiple decision makers. The GTM is based on directed graph structure and solution concepts. To demonstrate the performance of the GTM, using a numerical example, the GTM is applied to an environmental conflict problem, especially a non-preferred waste disposal siting conflict available in the literature. It is found that with GTM the states in equilibrium can be recognized. The conflict under consideration is to select a site of non-preferred waste facilities. The government is to choose a site of installation for users of a toxic waste disposal facility. A certain time-point of interest is a period of time to select one of candidate sites that completely meet regular criteria of governmental body in charge of permitting a facility site. The facility siting conflict among multiple players (i.e., decision-makers, DMs) of concern is viewed as a multiple player-multiple criteria (MPMC) domain. For instance, three possible sites (i.e., site A, site B, and site C) to be selected by multiple players are characterized by the building cost, accessibility, and proximity to the residential area. Concerning the site A, the installation of a facility is not expensive, the accessible to a facility is easy, and the site A is located very near a residential area. Concerning site B, the facility is expensive to build, the facility is easily accessible, and the site is located near the residential area. Concerning site C, the installation cost is expensive, the accessibility is difficult, and the location of site is far from the residential area. In simple models, three main groups of players could be considered to be the government, users, and local residents. The government is to play a role as one of proponents or

  17. 75 FR 22400 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator...

    Science.gov (United States)

    2010-04-28

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9142-6] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator Baltimore, L.P., Baltimore City, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean...

  18. Decommissioning of Malargue site: Engineering solution; Clausura del sitio Malargue: Solucion ingenieril

    Energy Technology Data Exchange (ETDEWEB)

    Liseno, Aldo; Giordano, Nolberto L [Comision Nacional de Energia Atomica, Buenos Aires (Argentina). Unidad Ejecutora del Proyecto PRAMU

    2000-07-01

    This paper provides a brief comment related with a projected repository to managed tailings of Malargue Plant, located in the city of Malargue (Mendoza province). The approved plan for restoration of Malargue consist of on site relocation of tailings to an engineered repository. The Site is located too close of Malargue city. To isolate tailings from the environment a multilayer system has been projected, in order to keep humidity of residues and multilayer, to avoid migration of contaminant to the environment. (author)

  19. Nitrate-cancrinite precipitation on quartz sand in simulated Hanford tank solutions.

    Science.gov (United States)

    Bickmore, B R; Nagy, K L; Young, J S; Drexler, J W

    2001-11-15

    Caustic NaNO3 solutions containing dissolved Al were reacted with quartz sand at 89 degrees C to simulate possible reactions between leaked nuclear waste and primary subsurface minerals at the U.S. Department of Energy's Hanford site in Washington. Nitrate-cancrinite began to precipitate onto the quartz after 2-10 days, cementing the grains together. Estimates of the equilibrium constant for the precipitation reaction differ for solutions with 0.1 or 1.0 m OH- (log Keq = 30.4 +/- 0.8 and 36.2 +/- 0.6, respectively). The difference in solubility may be attributable to more perfect crystallinity (i.e., fewer stacking faults) in the higher-pH cancrinite structure. This is supported by electron micrographs of crystal morphology and measured rates of Na volatilization under an electron beam. Precipitate crystallinity may affect radionuclide mobility, because stacking faults in the cancrinite structure can diminish its zeolitic cation exchange properties. The precipitation rate near the onset of nucleation depends on the total Al and Si concentrations in solution. The evolution of experimental Si concentrations was modeled by considering the dependence of quartz dissolution rate on AI(OH)4- activity, cancrinite precipitation, and the reduction of reactive surface area of quartz due to coverage by cancrinite.

  20. Hanford facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-01-01

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains ''umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit