  1. Highland Uranium Solution Mining Project. Draft environmental statement

    International Nuclear Information System (INIS)

    1978-05-01

    Exxon Minerals Co. proposes to conduct production-scale solution mining (in situ leaching) of uranium within the existing Highland Operation area in Converse County, Wyoming. The project would result in the temporary removal of 200 acres from grazing and the actual disturbance of 50 acres. About 4500 acre-ft of water will be withdrawn from the ore zone aquifer over the 10-year life of the project. There will be no discharge of liquid effluents from the project; atmospheric effluents will be within acceptable limits. Radiation doses at the nearest ranch resulting from solution mining activities were estimated. The project proposes the production and utilization of 1 to 3 million lb of uranium resources. It will not produce any significant socioeconomic impact on the local area. Alternatives to the project were considered, and conditions for issuing the source material license are listed

  2. 76 FR 21401 - Notice of Availability of the Draft EIS for the HB In-Situ Solution Mine Project, Eddy County, NM

    Science.gov (United States)

    2011-04-15

    ...] Notice of Availability of the Draft EIS for the HB In-Situ Solution Mine Project, Eddy County, NM AGENCY... prepared a Draft Environmental Impact Statement (EIS) for the HB In- Situ Solution Mine Project, and by... considered, the BLM must receive written comments on the HB In-Situ Solution Mine Project Draft EIS within 60...

  3. 77 FR 5566 - Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County...

    Science.gov (United States)

    2012-02-03

    ...] Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County, New Mexico... Statement (Final EIS) for the HB In-Situ Solution Mine Project, and by this notice is announcing its... the Federal Register. ADDRESSES: Copies of the HB In-Situ Solution Mining EIS are available for public...

  4. Solution mining economics

    International Nuclear Information System (INIS)

    Hunkin, G.G.

    1980-01-01

    The field of application of in-situ solution mining of uranium is described and areas of competition with open pit and underground mining identified. The influence of high interest rates and dollar inflation on present values and rate of return is shown to be minimized by low capitalization and short construction lead times typical of in-situ leaching ventures. A scheme of three major project account divisions is presented and basic parameters necessary for mine planning are listed. 1979 cost ranges and useful methods of estimation of capital and operating costs are given for the in-situ uranium mining method

  5. Draft environmental statement. Wyoming Mineral Corporation, Irigaray solution mining project (Johnson County, Wyoming)

    International Nuclear Information System (INIS)

    1978-04-01

    The Irigaray project consists of solution mining (in situ leaching) operations involving uranium ore deposits in Johnson County, Wyoming. Solution mining activities will include a processing facility with an annual production of 500,000 lb of U 3 O 8 from up to 50 acres of well fields through the initial license authorization. The Irigaray project has an estimated lifetime of 10 to 20 years with known ore deposits and the current level of solution mining technology. Environmental impacts and adverse effects are summarized. The site is mostly used as grazing land for cattle and sheep. Initiation of the Irigaray project would result in the temporary removal from grazing and the disturbance of approximately 60 acres during operation. All disturbed surface areas will be reclaimed and returned to their original use. Approximately 1.2 x 10 6 m 3 (1000 acre-ft) of water will be withdrawn from the ore zone aquifer. This water will be conveyed to the onsite waste ponds for evaporation. An estimated 4.2 x 10 5 m 3 (340 acre-ft) of groundwater is expected to temporarily contain increased concentrations of radioactive and toxic elements during the operation of each 4-ha (10-acre) well field. Restoration should return this water to a condition that is consistent with its premining use (or potential use). There will be no discharge of liquid effluents from the Irigaray project. Atmospheric effluents will be within acceptable limits. The dose rates of radionuclides in the air at the nearest ranches from the plant site are tabulated. The Irigaray project proposes the production and utilization of 500,000 lb per year of uranium resources. The Irigaray project will not produce any significant socioeconomic impact on the local area because of the small number of employees that will be employed at the project

  6. Final environmental statement related to the Wyoming Mineral Corporation Irigaray uranium solution mining project (Johnson County, Wyoming)

    International Nuclear Information System (INIS)

    1978-09-01

    The Irigaray project consists of solution mining (in situ leaching) operations involving uranium ore deposits in Johnson County, Wyoming. Solution mining activities will include a processing facility with an annual production of 500,000 lb of U 3 O 8 from up to 50 acres of well fields through the initial license authorization. The Irigaray project has an estimated lifetime of up to 10 to 20 years with known ore deposits and the current level of solution mining technology. The site is mostly used as grazing land for cattle and sheep. Initiation of the Irigaray project would result in the temporary removal from grazing and the disturbance of approximately 60 acres during operation as proposed by the staff. All disturbed surface areas will be reclaimed and returned to their original use. Approximately 1.2 x 10 6 m 3 of water will be withdrawn from the ore zone aquifer. 43 figs, 52 tables

  7. Numerical Modeling Tools for the Prediction of Solution Migration Applicable to Mining Site

    International Nuclear Information System (INIS)

    Martell, M.; Vaughn, P.

    1999-01-01

    Mining has always had an important influence on cultures and traditions of communities around the globe and throughout history. Today, because mining legislation places heavy emphasis on environmental protection, there is great interest in having a comprehensive understanding of ancient mining and mining sites. Multi-disciplinary approaches (i.e., Pb isotopes as tracers) are being used to explore the distribution of metals in natural environments. Another successful approach is to model solution migration numerically. A proven method to simulate solution migration in natural rock salt has been applied to project through time for 10,000 years the system performance and solution concentrations surrounding a proposed nuclear waste repository. This capability is readily adaptable to simulate solution migration around mining

  8. Uranium solution mining cost estimating technique: means for rapid comparative analysis of deposits

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    Twelve graphs provide a technique for determining relative cost ranges for uranium solution mining projects. The use of the technique can provide a consistent framework for rapid comparative analysis of various properties of mining situations. The technique is also useful to determine the sensitivities of cost figures to incremental changes in mining factors or deposit characteristics

  9. Oxidative destruction of ammonia for restoration of uranium solution mining sites

    International Nuclear Information System (INIS)

    Humenick, M.J.; Garwacka, K.

    1984-01-01

    A laboratory experimental research project was conducted to evaluate the use of chlorine for the oxidative destruction of residual ammonia that may remain in ground water after in-situ uranium solution mining operations. The work tested the idea of injecting high strength calcium hypochlorite solution into the mining zone to convert ammonia to nitrogen gas as a final cleanup process for ammonia removal from the ground water system. This paper details ammonia removal efficiency as a function of chlorine dose, reactant, and product material balances, and how the concept may be used as a final ground water restoration process

  10. Oxidative destruction of ammonia for restoration of uranium solution mining sites

    Energy Technology Data Exchange (ETDEWEB)

    Humenick, M.J.; Garwacka, K.

    1984-02-01

    A laboratory experimental research project was conducted to evaluate the use of chlorine for the oxidative destruction of residual ammonia that may remain in ground water after in-situ uranium solution mining operations. The work tested the idea of injecting high strength calcium hypochlorite solution into the mining zone to convert ammonia to nitrogen gas as a final cleanup process for ammonia removal from the ground water system. This paper details ammonia removal efficiency as a function of chlorine dose, reactant, and product material balances, and how the concept may be used as a final ground water restoration process.

  11. Oxidative destruction of ammonia for restoration of uranium solution mining sites

    Energy Technology Data Exchange (ETDEWEB)

    Humenick, M.J.; Garwacka, K.

    1984-01-01

    A laboratory experimental research project was conducted to evaluate the use of chlorine for the oxidative destruction of residual ammonia that may remain in ground water after in-situ uranium solution mining operations. The work tested the idea of injecting high strength calcium hypochlorite solution into the mining zone to convert ammonia to nitrogen gas as a final cleanup process for ammonia removal from the ground water system. This paper details ammonia removal efficiency as a function of chlorine dose, reactant, and product material balances, and how the concept may be used as a final ground water restoration process.

  12. Solution mining process

    International Nuclear Information System (INIS)

    Showalter, W.E.

    1984-01-01

    A solution mining process which may be used for uranium, thorium, vanadium, copper, nickel, molybdenum, rhenium, and selenium is claimed. During a first injection-and-production phase of between 6 months and 5 years, a leaching solution is injected through at least one well into the formation to solubilize the mineral values and form a pregnant liquor. This liquor is recovered through another well. The leaching solution contains sulfuric acid, nitric acid, hydrochloric acid, carbonic acid, an alkali metal carbonate, an alkali metal bicarbonate, ammonium carbonate or ammonium bicarbonate. Subsequently during a first production-only phase of between about 2 weeks and one year, injection of the leaching solution is suspended but pregnant liquor is still recovered. This stage is followed by a second injection-and-production phase of between 6 months and 5 years and a second production-only phase. The mineral values are separated from the pregnant liquor to form a barren liquor. The leaching agent is introduced into this liquor, and the solution is recycled. In a second claim for the solution mining of uranium, dilute carbonic acid is used as the leaching solution. The solution has a pH less than 7 and a bicarbonate ion concentration between about 380 ppm and 1000 ppm. The injection-and-production phase lasts between one and two years and the production only phase takes between one and four months. Carbon dioxide is introduced into the barren liquor to form a dilute carbonic acid solution and the solution is recycled

  13. Restoration of groundwater after solution mining at the Highland Uranium Project, Wyoming, USA

    Energy Technology Data Exchange (ETDEWEB)

    Hunter, J. [Waste Technology Group, British Nuclear Fuels PLC, Risley, Warrington (United Kingdom); Huffman, L. [Power Resources Inc., Highland Uranium Mine, Glenrock, Wyoming (United States)

    2000-07-01

    The Highland Project, located in Converse County, Wyoming, has had a successful 11 year history of in-situ leach mining of Tertiary roll-front uranium deposits. The uranium ore is oxidized and solubilized by circulating native groundwater, containing additional dissolved O{sub 2} and CO{sub 2}, within confined fluvial aquifers at depths of 200 - 250 m. The changing chemistry of this groundwater during leaching is discussed, as are the various treatment techniques that have been used to restore this fluid at the end of mining. Examples are provided which demonstrate the varying effectiveness of each technique for the reduction of elevated concentrations of different groundwater parameters. The complications arising from the proximity of the earliest wellfields to abandoned, conventional mine workings, as well as unexpected side effects from each restoration method, have combined to make an interesting case history from this long established mining operation. (author)

  14. International SUSMIN-project aims at sustainable gold mining in EU

    Science.gov (United States)

    Backnäs, Soile; Neitola, Raisa; Turunen, Kaisa; Lima, Alexandre; Fiúza, António; Szlachta, Malgorzata; Wójtowicz, Patryk; Maftei, Raluca; Munteanu, Marian; Alakangas, Lena; Baciu, Calin; Fernández, Dámaris

    2015-04-01

    Although the gold demand has been constantly increasing in past years, the commodity findings have been decreasing and the extraction of gold has complicated due to increasing complexity and decreasing grade of the ores. Additionally, even gold mining could increase economical development, it has also challenges in eco-efficiency and extraction methods (e.g. cyanide). Thus, the novel energy and resource-efficient methods and technologies for mineral processing should be developed to concentrate selectively different gold bearing minerals. Furthermore, technologies for efficient treatment of mine waters, sustainable management of wastes, and methods to diminish environmental and social impacts of mining are needed. These problems will be addressed by the three year long project SUSMIN. The SUSMIN-project identifies and evaluates environmental impacts and economical challenges of gold mining within EU. The objective of the project is to increase the transnational cooperation and to support environmentally, socially and economically sustainable viable gold production. The focus is to develop and test geophysical techniques for gold exploration, eco-efficient ore beneficiation methods and alternatives for cyanide leaching. Additionally, the research will improve treatment methods for mine waters by the development and testing of advanced adsorbents. The research on socio-economic issues pursues to develop tools for enhancing the mechanisms of the corporate social responsibility as well as community engagement and management of the relations with the stakeholders. Moreover, with the environmental risk assessment and better knowledge of the geochemistry and long-term transformation of the contaminants in mining wastes and mine waters, the mining companies are able to predict and prevent the impacts to the surrounding environment, resulting in an improved environmental management solution. The SUSMIN consortium led by Geological Survey of Finland (GTK) includes seven

  15. Responsible Mining: A Human Resources Strategy for Mine Development Project

    OpenAIRE

    Sampathkumar, Sriram (Ram)

    2012-01-01

    Mining is a global industry. Most mining companies operate internationally, often in remote, challenging environments and consequently frequently have respond to unusual and demanding Human Resource (HR) requirements. It is my opinion that the strategic imperative behind success in mining industry is responsible mining. The purpose of this paper is to examine how an effective HR strategy can be a competitive advantage that contributes to the success of a mining project in the global mining in...

  16. New mine projects, positive outlook

    Energy Technology Data Exchange (ETDEWEB)

    M. Cremer

    2006-12-15

    Speaking on the first day at the Mining 2006 Resources Convention the Deputy Director General, Mining and Petroleum gave an optimistic outlook for mining in 2007 based on the number of new projects under consideration or construction. The convention was held in early November in Brisbane, Queensland, Australia. 3 figs., 1 photo.

  17. Data Mining Solutions for the Business Environment

    Directory of Open Access Journals (Sweden)

    Ruxandra-Stefania PETRE

    2014-02-01

    Full Text Available Over the past years, data mining became a matter of considerable importance due to the large amounts of data available in the applications belonging to various domains. Data mining, a dynamic and fast-expanding field, that applies advanced data analysis techniques, from statistics, machine learning, database systems or artificial intelligence, in order to discover relevant patterns, trends and relations contained within the data, information impossible to observe using other techniques. The paper focuses on presenting the applications of data mining in the business environment. It contains a general overview of data mining, providing a definition of the concept, enumerating six primary data mining techniques and mentioning the main fields for which data mining can be applied. The paper also presents the main business areas which can benefit from the use of data mining tools, along with their use cases: retail, banking and insurance. Also the main commercially available data mining tools and their key features are presented within the paper. Besides the analysis of data mining and the business areas that can successfully apply it, the paper presents the main features of a data mining solution that can be applied for the business environment and the architecture, with its main components, for the solution, that would help improve customer experiences and decision-making

  18. The environmental cost in the mining projects

    International Nuclear Information System (INIS)

    Gaviria Rivera Antonio

    1992-01-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence

  19. Restoration of uranium solution mining deposits

    International Nuclear Information System (INIS)

    Devries, F.W.; Lawes, B.C.

    1982-01-01

    A process is provided for restoring an ore deposit after uranium solution mining using ammonium carbonate leaching solutions has ceased. The process involves flushing the deposit with an aqueous solution of a potassium salt during which potassium ions exchange with ammonium ions remaining in the deposit. The ammonium containing flushing solution is withdrawn from the deposit for disposal

  20. Restoration of uranium solution mining deposits

    Energy Technology Data Exchange (ETDEWEB)

    Devries, F.W.; Lawes, B.C.

    1982-01-19

    A process is provided for restoring an ore deposit after uranium solution mining using ammonium carbonate leaching solutions has ceased. The process involves flushing the deposit with an aqueous solution of a potassium salt during which potassium ions exchange with ammonium ions remaining in the deposit. The ammonium containing flushing solution is withdrawn from the deposit for disposal.

  1. SOLUTION MINING IN SALT DOMES OF THE GULF COAST EMBAYMENT

    Energy Technology Data Exchange (ETDEWEB)

    Griswold, G. B.

    1981-02-01

    Following a description of salt resources in the salt domes of the gulf coast embayment, mining, particularly solution mining, is described. A scenario is constructed which could lead to release of radioactive waste stored in a salt dome via inadvertent solution mining and the consequences of this scenario are analyzed.

  2. Coal Mines, Reclamation Sites - Mine Drainage Treatment/Land Recycling Project Locations

    Data.gov (United States)

    NSGIC Education | GIS Inventory — Mine Drainage Treatment/Land Reclamation Locations are clean-up projects that are working to eliminate some form of abandoned mine. The following sub-facility types...

  3. Mining project of the Taja Margaritas

    International Nuclear Information System (INIS)

    Martinez A, O.

    1980-01-01

    A summary of the study of a mining project designed to determine the feasibility of open-pit mining in uranium deposits along the Pena Blanca mountain ridges in Taja Margaritas, is presented. (author)

  4. Nitrification and in-situ uranium solution mining

    International Nuclear Information System (INIS)

    Johnson, D.; Humenick, M.J.

    1980-01-01

    The objective of this research was to determine the potential for conversion of ammonia to nitrate as a result of uranium solution mining operations. The work included literature evaluation and laboratory experimentation in both batch and continuous systems. Results indicate that a potential for nitrification could exist for some portions of the solution mining operating cycle. However, inhibition of nitrification was observed due to high ammonia and peroxide concentrations. Nitrification of ammonia also was observed to occur due to chemical oxidation by peroxide. 28 refs

  5. Imouraren mining exploitation : Complementary studies Synthetic report Volum B - Mines

    International Nuclear Information System (INIS)

    1980-01-01

    The object of the current study is to determine the main technical characteristics of the reference project of a mine that can supply the necessary ore quantity at a production of 3000 tonnes uranium per year, along 10 years. The project is one of the possible solutions for exploiting the mine. The current study permits to establish : investment and functioning cost estimation, overall project of the mining exploitation program, necessary strength estimation, average ore grades evaluation and variations of these grades, utilities needs, production vizing program, main exploitation methods and necessary materials. Reference project study of the mine serves as base to the economics studies and studies optimization [fr

  6. Measurement and control in solution mining of copper and uranium

    International Nuclear Information System (INIS)

    Davidson, D.H.; Huff, R.V.; Sonstelie, W.E.

    1978-01-01

    The solution mining of deep-lying mineral deposits requires an integration of oilfield and extractive mineral technology. Although instrumentation is available to measure parameters relating to the oilfield components such as permeability, porosity and flow-logging, only limited services exist for monitoring leaching performance. This paper discusses the history of copper leaching, the need for solution mining development, and solution mining process descriptions. It discusses measurement requirements for deposit evaluation and the injection and production wellfields. It is concluded with a listing of desirable but unavailable instrumentation for further development of this technology

  7. The mathematical models of solution mining and case study

    International Nuclear Information System (INIS)

    Jacobson, R.H.; Waskovsky, J.; Wang Xiwen; Wang Haifeng

    1991-01-01

    The mathematical model of parameters which describe solution mining and the principle of ore leaching are presented theoretically and thoroughly with the emphasis on in-situ leaching with a biolixiviant, furthermore, the example of bioleach mining, or biomining, in an abandoned underground copper mine is discussed

  8. In situ solution mining technique

    International Nuclear Information System (INIS)

    Learmont, R.P.

    1978-01-01

    A method of in situ solution mining is disclosed in which a primary leaching process employing an array of 5-spot leaching patterns of production and injection wells is converted to a different pattern by converting to injection wells all the production wells in alternate rows

  9. Perils of project development on public land open to mining

    International Nuclear Information System (INIS)

    Jacobs, W.R.

    1991-01-01

    Conducting a government project on public land open to the general mining laws can result in added costs, legal entanglements, schedule uncertainties, and the potential for unanticipated safety issues and concerns due to interactions with mining claimants. Planning for such projects must include a careful assessment of not only land access needs and restrictions, but also possible scenarios for conflict with activities authorized under the general mining laws throughout the life of the project. It is essential to have a thorough knowledge of the applicable mining laws and how they are currently being interpreted and applied by the responsible regulatory authorities and land managers. The Yucca Mountain Project approach to land access, problems encountered with mining claims filed under the Mining Law of 1872, and the lessons learned from these experiences are discussed in this paper

  10. Final Environmental Impact Statement to construct and operate the Crownpoint Uranium Solution Mining Project, Crownpoint, New Mexico

    International Nuclear Information System (INIS)

    1997-02-01

    This Final Environmental Impact Statement (FEIS) addresses the proposed action of issuing a combined source and 11e(2) byproduct material license and minerals operating leases for Federal and Indian lands to Hydro Resources, Inc. (HRI). This action would authorize HRI to conduct in-situ leach uranium mining in McKinley County, New Mexico. Such mining would involve drilling wells to access the ore bodies, then recirculating groundwater with added oxygen to mobilize uranium found in the ore. Uranium would then be removed from the solution using ion exchange technology in processing plants located at three separate sites. As proposed by HRI, a central plant would provide drying and packaging equipment for the entire project. The Draft Environmental Impact Statement (DEIS) for the proposed action was prepared by an interagency review group comprising staff from the Nuclear Regulatory Commission, the Bureau of Indian Affairs, and the Bureau of Land Management, and published in October 1994. After evaluating the environmental impacts of the proposed action in the DEIS, the reviewing agencies concluded that the appropriate action was to issue the requested license and proposed leases authorizing HRI to proceed with the project. This FEIS reevaluates the proposed licensing action on the basis of written and oral comments received on the DEIS and on additional information obtained in 1995 and 1996. The FEIS describes and evaluates (1) the purpose of and need for the proposed action, (2) alternatives to the proposed action, (3) the environmental resources that could be affected by the proposed action and alternatives, (4) the potential environmental consequences of the proposed action and alternatives, and (5) the economic costs and benefits associated with the proposed action. Based on this assessment, the FEIS makes recommendations concerning the requested license and proposed leases

  11. Environmental impact of solution mining for uranium

    International Nuclear Information System (INIS)

    Hunkin, G.G.

    1975-01-01

    Compared with most other mining systems, uranium solution mining has a negligible effect on such environmental factors as surface disturbance, interference with natural groundwater quality and distribution, and aerial discharge of radionuclides. The following topics are discussed: the process, personnel safety and health, tailings disposal, impact on groundwater, operating licenses and controls, legislation, and economics. It is concluded that engineered well systems and controlled input/production flow rates, combined with full recirculation systems that maintain constant fluid volumes in the mineralized formations, result in containment of leach solutions within the operating area. The very dilute leach solutions, compatible with natural groundwaters, ensure that no environmental damage results, even if a loss of control occurred. Reduction in the number of processing steps and virtual elimination of operator hazards, waste disposal and land rehabilitation costs help in reducing overall costs

  12. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    Science.gov (United States)

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  13. Mine subsidence control projects associated with solid waste disposal facilities

    International Nuclear Information System (INIS)

    Wood, R.M.

    1994-01-01

    Pennsylvania environmental regulations require applicant's for solid waste disposal permits to provide information regarding the extent of deep mining under the proposed site, evaluations of the maximum subsidence potential, and designs of measures to mitigate potential subsidence impact on the facility. This paper presents three case histories of deep mine subsidence control projects at solid waste disposal facilities. Each case history presents site specific mine grouting project data summaries which include evaluations of the subsurface conditions from drilling, mine void volume calculations, grout mix designs, grouting procedures and techniques, as well as grout coverage and extent of mine void filling evaluations. The case studies described utilized basic gravity grouting techniques to fill the mine voids and fractured strata over the collapsed portions of the deep mines. Grout mixtures were designed to achieve compressive strengths suitable for preventing future mine subsidence while maintaining high flow characteristics to penetrate fractured strata. Verification drilling and coring was performed in the grouted areas to determine the extent of grout coverage and obtain samples of the in-place grout for compression testing. The case histories presented in this report demonstrate an efficient and cost effective technique for mine subsidence control projects

  14. EIA for mining projects in the CIS

    Energy Technology Data Exchange (ETDEWEB)

    Coppin, N.J.; Wheeler, P. [Wardell Armstrong, Newcastle under Lyme (United Kingdom)

    1996-12-31

    This paper examines the Environmental Impact Assessment (EIA) requirements and procedures encountered during work on gold and coal mining projects in Kazakhstan, Uzbekistan and Mongolia. Observations on the implementation of former-Soviet inspired EIA in the Commonwealth of Independent States (CIS), and the differences with North American and European requirements and procedures are highlighted, particularly where these indicate lessons for the West. The main implications for mining companies considering or developing projects in the CIS are discussed, particularly the procedures that have to be followed for environmental permitting. 2 figs.

  15. Predicting Software Projects Cost Estimation Based on Mining Historical Data

    OpenAIRE

    Najadat, Hassan; Alsmadi, Izzat; Shboul, Yazan

    2012-01-01

    In this research, a hybrid cost estimation model is proposed to produce a realistic prediction model that takes into consideration software project, product, process, and environmental elements. A cost estimation dataset is built from a large number of open source projects. Those projects are divided into three domains: communication, finance, and game projects. Several data mining techniques are used to classify software projects in terms of their development complexity. Data mining techniqu...

  16. Sustainability of new uranium mining projects in Argentina

    International Nuclear Information System (INIS)

    Navarra, P.R.

    2002-01-01

    The regulatory framework issued in the 1994-1995 period, connected mining activities in Argentina with international good environmental practices. Agreements between National Government and Provinces allow the application of the regulations, while Act No 24.585, the milestone about the matter, establishes the steps for the approval of the Report of Environmental Impact, on successive stages of the project. Specifically for uranium mining and milling, the assessment of the radiological protection aspects of the planned activities is assigned to the Nuclear Regulatory Authority. The National Atomic Energy Commission is at present carrying out two uranium mining projects, that involve the Sierra Pintada and Cerro Solo deposits. The goal of them is restart uranium production in the country in the medium term, by lowing the gap between indigenous and market uranium prices. The first one consists in updating the feasibility study of the, at present inactive, Sierra Pintada Production Center (Mendoza Province). Studies for improving the mining and treatment methods are performed in the project, co-ordinately with the investigation and forecast of mining waste and processing tailings management. Besides, the procedures will be determined taking into account the methodology to be applied when getting the closure stage, about the existing waste and tailings. Development of the Sierra de Pichinan District, Chubut Province (U-Mo), is the objective of the second project. It is remarkable that about Cerro Solo, the main ore deposit belonging to this area, at the prefeasibility stage, CNEA is currently encouraging private investment through a bidding process. Environmental studies are an important aspect of the activities carried out and planned in the area. As a conclusion, with regard uranium mining and milling activities in Argentina, the regulations and environmental technical-scientific knowledge are becoming friendly with the sustainable practice. (author)

  17. Uranium solution mining: comparison of New Mexico with South Texas

    International Nuclear Information System (INIS)

    Conine, W.D.

    1980-01-01

    In-situ uranium-leaching or solution-mining operations are currently underway in both south Texas and Wyoming. Mobil Oil Corporation is in the process of applying solution-mining technology, such as that developed at the O'Hern facility in south Texas, to uranium orebodies located near Crownpoint, New Mexico. The O'Hern facility uses an alkaline-leach process to bring the uranium to the surface, where it is removed from solution using ion-exchange resin and chemical precipitation. Line-drive and five-spot well field patterns are used to inject and recover the leach solutions. Although details of ore occurrence in New Mexico differ from those in south Texas, laboratory, engineering-design, and field-hydrology tests indicate that solution mining of uranium should be feasible in New Mexico. To determine the commercial feasibility, Mobil is proceeding with the construction of pilot-plant facilities for a 75-gallon-perminute (gpm) test at an orebody near Crownpoint. The pilot test will use five-spot patterns at various spacings for production of uranium-bearing leachate. Initial surface processing will be the same as that used in south Texas

  18. Method for improving solution flow in solution mining of a mineral

    International Nuclear Information System (INIS)

    Moore, T.

    1980-01-01

    An improved method for the solution mining of a mineral from a subterranean formation containing same in which an injection and production well are drilled and completed within said formation, leach solution and an oxidant are injected through said injection well into said formation to dissolve said mineral, and said dissolved mineral is recovered via said production well, wherein the improvement comprises pretreating said formation with an acid gas to improve the permeabiltiy thereof

  19. Developments in uranium solution mining in Australia

    International Nuclear Information System (INIS)

    Hunter, T.

    2001-01-01

    The last five years have seen rapid developments in uranium solution mining in Australia, with one deposit brought into production (Beverley, 1,000 tpa U 3 O 8 ) and another close to receiving development approval (Honeymoon, 500 expanding to 1,000 tpa U 3 O 8 proposed). The deposits were discovered during extensive exploration of the Frome Basin in South Australia in the early 1970s and were mothballed from 1983 to 1996 due to Government policies. Uranium mineralisation at Beverley, Honeymoon and other related prospects is hosted in unconsolidated coarse grained quartz sands which are sealed in buried palaeovalleys. Both projects have successfully trialled acid leaching methods and have confirmed high permeability and confinement of the target sands. At Beverley an ion exchange process has been adopted, whereas at Honeymoon solvent extraction has been trialled and is proposed for future production Australian production economics compare favourably with US counterparts and are likely to be within the lower quartile of world costs

  20. Composition and method for solution mining of uranium ores

    International Nuclear Information System (INIS)

    Lawes, B.C.; Watts, J.C.

    1981-01-01

    It has been found that, in the solution mining of uranium ores using ammonium carbonate solutions containing hydrogen peroxide or ozone as an oxidant, the tendency of the formation being treated to become less permeable during the leaching process can be overcome by including in the leaching solution a very small concentration of sodium silicate

  1. Concept and Establishment of the Mine Information System within the CROMAC GIP Project

    Directory of Open Access Journals (Sweden)

    Zvonko Biljecki

    2006-12-01

    Full Text Available In order to solve mine problems in the Republic of Croatia, a unique project CROMAC GIP (Croatian Mine Action Centre Geoinformation Project has been initiated significantly increasing the functional quality of the existing Mine Information System (MIS. Since mine problems are closely related to space, geodata are a crucial part of MIS intended for monitoring and planning of demining. Since the moment the Croatian Mine Action Centre was funded till today, the process of demining has progressed. The implementation of a topographic database in accordance with the CROTIS data model and the usage of orthophoto data produced according to the official product specifications can be pointed out in that progress. Usage of such geodata requires a sophisticated information system that enables a simultaneous usage of geodata and other data connected with solving mine problems. In order to reach all goals in demining and to use all advantages of geodata, it was indispensable to upgrade the existing Mine Information System by merging geodata and HCR data and to collect new data according to the standardized procedures, but controlling at the same time the quality and automated procedures of uploading into the system. Apart from being constructed in accordance with the Standard Operative Procedures (SOP, the modernised MIS is also based on generally accepted standards in the field of geoinformation and it is implemented on advanced technology. The core of the system is the Oracle database, and GeoMedia is a WebMap Professional tool on the basis of which the distribution and the work with spatial data is possible on intranet/Internet. In order to achieve full efficiency of the system, it is necessary to provide high quality and updated geodata. In this respect, photogrammetric data are the most efficient solution.

  2. Draft environmental statement. Homestake Mining Company: Homestake Mining Company Pitch Project (Saguache County, Colorado)

    International Nuclear Information System (INIS)

    1978-01-01

    The draft concerns the proposed issuance of approvals, permits, and licenses to the Homestake Mining Company for the implementation of the Pitch Project. The Pitch Project consists of mining and milling operations involving uranium ore deposits located in Gunnison National Forest, Saguache County, Colorado. Mining of uranium ore will take place over an estimated period of 20 years; a mill with a nominal capacity of 544 metric tons per day (600 tons per day) will be constructed and operated as long as ore is available. The waste material (tailings) from the mill, also produced at a rate of about 544 metric tons per day (600 tons per day), will be buried onsite at the head end of a natural valley. The environmental impacts are summarized in sections on the existing environment, applicant's proposed mining and milling operation, environmental effects of accidents, monitoring programs, productivity, commitment of resources, alternatives, and cost-benefit evaluation

  3. Application of solution-mineral equilibrium chemistry to solution mining of uranium ores

    International Nuclear Information System (INIS)

    Riese, A.C.; Popp, C.J.

    1979-01-01

    The tests described were undertaken to determine the extent to leach solution-rock interactions with uranium-bearing ore obtained from the Mariano Lake mine. Leach solutions of an acidic (H/sub 2/O/sub 4/-sulfuric acid) and basic (NaHCO/sub 3/-sodium bicarbonate) nature were tested, in addition to a leach solution containing potassium chloride and sulfuric acid (KCl/H/sub 2/SO/sub 4/). The latter solution was chosen in an attempt to equilibrate the aqueous phase with the rock-forming silicate minerals and minimize adverse effects such as clay formation, porosity loss, and lixiviant loss. 29 refs

  4. Application of solution-mineral equilibrium chemistry to solution mining of uranium ores

    International Nuclear Information System (INIS)

    Riese, A.C.; Propp, C.J.

    1980-01-01

    Modern methods of uranium solution mining are typically accompanied by gains and losses of mass through reagent consumption by rock-forming minerals, with subsequent formation of clay minerals, gypsum, carbonates, and iron oxyhydroxides. A systematic approach to alleviate such problems involves the application of leach solutions that are in equilibrium with the host-rock minerals but in disequilibrium with the ore-forming minerals. This partial equilibrium can be approximated by solution-composition adjustments within the systems K 2 O-Al 2 O 3 SiO 2 -H 2 O and Na 2 O 3 -Al 2 O 3 SiO 2 -H 2 O. Uranium ore containing 0.15 percent U 3 O 8 from the Gulf Mineral Resources Corporation's Mariano Lake mine, the Smith Lake district of the Grants mineral belt, was collected for investigation. Presented are a theoretical evaluation of leachate data and an experimental treatment of the ore, which contained mainly K-feldspar, plagioclase feldspar, and quartz (with lesser amounts of micas, clay minerals, and organic carbonaceous material). Small-scale (less than or equal to 1 kg) column-leaching experiments were conducted to model the results of conventional leaching operations and to provide leachate solutions that could be compared with solutions calculated to be in equilibrium with the matrix minerals. Leach solutions employed include: 1) sulfuric acid, 2) sodium bicarbonate, and 3) sulfuric acid with 1.0 molal potassium chloride. The uranium concentrations in the sodium-bicarbonate leach solution and the acid-leach solution were about a gram per liter at the termination of the tests. However, the permeability of the ore in the acid leach was greatly reduced, owing to the formation of clay minerals. Uranium solubility in the leach column stabilized with the potassium-chloride solution was calculated from leachate compositions to be limited by the solubility of carnotite

  5. ¡VAMOS! (Viable Alternative Mine Operating System) - a 'Horizon 2020' project

    Science.gov (United States)

    Sword, Cameron; Bodo, Balazs; Kapusniak, Stef; Bosman, Frank; Rainbird, Jenny; Silva, Eduardo

    2017-04-01

    The 42-month ¡VAMOS! project (Viable Alternative Mine Operating System, Grant Agreement 642477, www.vamos-project.eu), funded by the EC H2020 Programme, will enable access to high-grade EU reserves of mineral ore-bodies by developing an innovative clean and low visibility mining technique. The project will demonstrate the technological and economic viability of the underwater extraction of metallic mineral deposits which are currently technologically, economically, and environmentally unobtainable. In doing so, ¡VAMOS! hopes to encourage investment in abandoned open-pit mines and prospective mines, helping to put the EU back on a level playing field with the rest of the world in terms of access to strategically important minerals. The ¡VAMOS! concept is defined by a remotely-operated underwater mining vehicle, adapted and improved from existing subsea mining technology. Operating in tandem with an HROV, the mining vehicle will connect to a flexible riser through which slurried mined material will be pumped from the mudline to onshore dewatering facilities via a floating mobile deployment-module, on which will be fitted a bypass system linked to an LIBS, allowing real-time grade-control. Analysis of European and national regulation and stakeholder assessments found there is significant support for developing the technology among local communities and governments. An initial environmental assessment of the potential impact of the innovative mining operation concluded the project has a smaller environmental footprint than conventional mining operations: this is due to factors including the quieter operation and absence of blasting, zero water-table flux, and the higher stripping ratio enabled by higher fluid pressure acting on the sidewalls of the mine. The prototypes are currently in their construction phase following a final design freeze in October 2016. Work is now underway on the foresight visioning, economic evaluation and policy guidelines for the

  6. SkyMine Carbon Mineralization Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Joe Jones; Clive Barton; Mark Clayton; Al Yablonsky; David Legere

    2010-09-30

    This Topical Report addresses accomplishments achieved during Phase 1 of the SkyMine{reg_sign} Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO{sub 2} from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO{sub 2} to products having commercial value (i.e., beneficial use), show the economic viability of the CO{sub 2} capture and conversion process, and thereby advance the technology to a point of readiness for commercial scale demonstration and proliferation. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at commercial scale. The primary objectives of Phase 1 of the project were to elaborate proven SkyMine{reg_sign} process chemistry to commercial pilot-scale operation and complete the preliminary design ('Reference Plant Design') for the pilot plant to be built and operated in Phase 2. Additionally, during Phase 1, information necessary to inform a DOE determination regarding NEPA requirements for the project was developed, and a comprehensive carbon lifecycle analysis was completed. These items were included in the formal application for funding under Phase 2. All Phase 1 objectives were successfully met on schedule and within budget.

  7. Mining-metallurgical projects for the production of uranium concentrates

    International Nuclear Information System (INIS)

    Ajuria-Garza, S.

    1983-01-01

    This report presents an overall view of a complete project for a mining-metallurgical complex for the production of uranium concentrates. Relevant aspects of each important topic are discussed as parts of an integrated methodology. The principal project activities are analyzed and the relationships among the various factors affecting the design are indicated. A list of 96 principal activities is proposed as an example. These activities are distributed in eight groups: initial evaluations preliminary feasibility studies, project engineering, construction, industrial operation, decommissioning and post-decommissioning activities. The environmental impact and the radiological risks due to the construction and operation of the mining metallurgical complex are analyzed. The principles of radiological protection and the regulations, standards and recommendations for radiological protection in uranium mines and mills are discussed. This report is also a guide to the specialized literature: a bibliography with 765 references is included. (author)

  8. Mining Survey System (MSS) - innovative solution in Polish mines. (Polish Title: Mobilna Platforma Gurnicza (MPG) - nowatorskim rozwilazaniem w polskich kopalniach)

    Science.gov (United States)

    Adamek, A.

    2015-12-01

    Mobile laser scanning technology is developing rapidly also in mining. For several years research and tests are conducted on the use of that type of measurement in the inventory of the mine shafts. The company SKALA 3D in the project 1.4 POIG by PARP undertook to create Mobile automatic steering system of spatial geometry measurements mine shafts using laser scanning technology. Its main advantage is a faithful reflection of the object being measured in just a few hours. It is based on the data flowing from laser scanners and precision inertial unit. The main problem of the research was to determine the trajectory of the passing Mobile Platforms Mining (MPG) in the shaft as accurately as possible. Unable to receive signals from satellites in the pipe shaft prevented the use of solutions known for measuring terrestrial mobile systems. The company SKALA 3D has developed a methodology for determine the trajectory of the system, based on geometrical data coming from laser scanners and readings of accelerometers and gyroscopes of inertial unit. To improve the quality and accuracy of measurements MPG is also equipped with a set of anti-vibration parts prevent the transmission of vibrations ascending while cage is moving in the shaft on the measuring system. The whole forms a calibrated system, which in a short time is able to provide spatial measurement data from the measuring shaft. The accuracy of 2-3 mm in a single measurement horizon and a few centimeters determine the position of a point on the thousandth meter below ground make the system very accurate. During the project there have been numerous research problems, including the need to define the physical references, drift of IMU whether harsh weather conditions in the shaft. However, the company SKALA 3D solved these problems and making MPG unique in the world.

  9. Preoperational assessment of solute release from waste rock at proposed mining operations

    International Nuclear Information System (INIS)

    Lapakko, Kim A.

    2015-01-01

    Highlights: • Modeling to estimate solute release from waste rock at proposed mines is described. • Components of the modeling process are identified and described. • Modeling inputs required are identified and described. • Examples of data generated and their application are presented. • Challenges inherent to environmental review are identified. - Abstract: Environmental assessments are conducted prior to mineral development at proposed mining operations. Among the objectives of these assessments is prediction of solute release from mine wastes projected to be generated by the proposed mining and associated operations. This paper provides guidance to those engaged in these assessments and, in more detail, provides insights on solid-phase characterization and application of kinetic test results for predicting solute release from waste rock. The logic guiding the process is consistent with general model construction practices and recent publications. Baseline conditions at the proposed site are determined and a detailed operational plan is developed and imposed upon the site. Block modeling of the mine geology is conducted to identify the mineral assemblages present, their masses and compositional variations. This information is used to select samples, representative of waste rock to be generated, that will be analyzed and tested to describe characteristics influencing waste rock drainage quality. The characterization results are used to select samples for laboratory dissolution testing (kinetic tests). These tests provide empirical data on dissolution of the various mineral assemblages present as waste rock. The data generated are used, in conjunction with environmental conditions, the proposed method of mine waste storage, and scientific and technical principles, to estimate solute release rates for the operational scale waste rock. Common concerns regarding waste rock are generation of acidic drainage and release of heavy metals and sulfate. Key solid

  10. Uranium mining environmental restoration project (PRAMU)

    International Nuclear Information System (INIS)

    Asenjo, A.

    2002-01-01

    The National Atomic Energy Commission (CNEA) started its activities 50 years ago and obtained significant results. At the present time, the CNEA is defined as an Institution of research and development in the nuclear field. It is also responsible for the management of radioactive wastes and the dismantling of nuclear and radioactive facilities. Mining and milling activities have been carried out during the past 40 years and at present the CNEA is undertaking the Uranium Mining Environmental Restoration Project (PRAMU). The aim of this project is to restore the environment as much as is possible in all places where uranium mining and milling activities were developed when taking into consideration both economic and technical reality. First, the characteristics of the problems in each site are determined through appropriate studies which identify the existing or potential impacts, the possible pathways of contamination, etc. The sites being studied are: MALARGUE (Mendoza Province), CORDOBA (Cordoba Province), LOS GIGANTES (Cordoba Province), HUEMUL (Mendoza Province), PICHINAN (Chubut Province), TONCO (Salta Province), LA ESTELA (San Luis Province), LOS COLORADOS (La Rioja Province). PRAMU seeks to improve the current conditions of the tailings deposits and mines and to ensure the long term protection of people and the environment. The CNEA is required to comply with all legislation that is in force and is under the control of various national, provincial and local State institutions. The main objectives of the project for the various sites are: (a) Malargue site: to implement the actions necessary for environmental restoration and management of the tailings derived from the uranium ores processed in the industrial plant; (b) Cordoba and Los Gigantes sites: to design, engineer and execute the activities required for closure of the sites; (c) Other sites (Huemul, Pichinan, Tonco, La Estela, Los Colorados): to develop an environmental evaluation and, on the basis of

  11. A study of critical paths for feasibility studies of mining projects

    International Nuclear Information System (INIS)

    Sayadi, R.

    2002-01-01

    This work develops a model for design and realisation of profitability's and feasibility studies of a mining project. The model provides the structure of various necessary procedures to establish the feasibility studies and presents a logical system of task sequencing and information circulating between tasks. The specifications of mining projects, particularly their duration, complexity and high costs, necessitate design and realisation of feasibility study bases on the sufficient understanding of task behaviour and the critical path method view. For this purpose, critical paths with the highest frequency of occurrence were studied through several simulations. In addition, the critical tasks and sub tasks with the most probability were identified. The model introduced in this paper can serve as a perfect tool in feasibility study of a mining project. It can also be used as a basis of future development of mining software

  12. Aurora Mine project - historical resources baseline study

    International Nuclear Information System (INIS)

    Reeves, B.

    1996-01-01

    This volume contains the results of a base line archaeological study of the Aurora Mine Project local study area. It was compiled in support of Syncrude Canada's application to the Alberta Energy and Utilities Board (AEUB) and Alberta Environmental Protection to construct and operate it new Aurora Mine, located northeast of Fort McMurray, Alberta. The objective of this study was to compile, consolidate, review and analyze the reports for the area compiled over the past 22 years in and adjacent to the local study area (LSA), particularly those of now existing and Syncrude projects, and previously proposed Alsands and OSLO projects. The report is a summary of the human history in the area including pre-contact native archaeological sites, past archaeological studies, the Hinterland site pattern, post-contact native traditional sites, oil sands exploration/development related sites and paleontological sites in the subject area, and areas adjacent to it. 150 refs., 5 tabs., 43 figs

  13. Abandoned Mine Waste Working Group report

    International Nuclear Information System (INIS)

    1993-01-01

    The Mine Waste Working Group discussed the nature and possible contributions to the solution of this class of waste problem at length. There was a consensus that the mine waste problem presented some fundamental differences from the other classes of waste addresses by the Develop On-Site Innovative Technologies (DOIT) working groups. Contents of this report are: executive summary; stakeholders address the problems; the mine waste program; current technology development programs; problems and issues that need to be addressed; demonstration projects to test solutions; conclusion-next steps; and appendices

  14. Applications of Geomatics in Surface Mining

    Science.gov (United States)

    Blachowski, Jan; Górniak-Zimroz, Justyna; Milczarek, Wojciech; Pactwa, Katarzyna

    2017-12-01

    In terms of method of extracting mineral from deposit, mining can be classified into: surface, underground, and borehole mining. Surface mining is a form of mining, in which the soil and the rock covering the mineral deposits are removed. Types of surface mining include mainly strip and open-cast methods, as well as quarrying. Tasks associated with surface mining of minerals include: resource estimation and deposit documentation, mine planning and deposit access, mine plant development, extraction of minerals from deposits, mineral and waste processing, reclamation and reclamation of former mining grounds. At each stage of mining, geodata describing changes occurring in space during the entire life cycle of surface mining project should be taken into consideration, i.e. collected, analysed, processed, examined, distributed. These data result from direct (e.g. geodetic) and indirect (i.e. remote or relative) measurements and observations including airborne and satellite methods, geotechnical, geological and hydrogeological data, and data from other types of sensors, e.g. located on mining equipment and infrastructure, mine plans and maps. Management of such vast sources and sets of geodata, as well as information resulting from processing, integrated analysis and examining such data can be facilitated with geomatic solutions. Geomatics is a discipline of gathering, processing, interpreting, storing and delivering spatially referenced information. Thus, geomatics integrates methods and technologies used for collecting, management, processing, visualizing and distributing spatial data. In other words, its meaning covers practically every method and tool from spatial data acquisition to distribution. In this work examples of application of geomatic solutions in surface mining on representative case studies in various stages of mine operation have been presented. These applications include: prospecting and documenting mineral deposits, assessment of land accessibility

  15. SkyMine Carbon Mineralization Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Christenson, Norm; Walters, Jerel

    2014-12-31

    This Topical Report addresses accomplishments achieved during Phase 2b of the SkyMine® Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO2 from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO2 to products having commercial value (i.e., beneficial use), show the economic viability of the CO2 capture and conversion process, and thereby advance the technology to the point of readiness for commercial scale demonstration and deployment. The overall process is carbon negative, resulting in mineralization of CO2 that would otherwise be released into the atmosphere. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at the commercial scale. The project is being conducted in two phases. The primary objectives of Phase 1 were to evaluate proven SkyMine® process chemistry for commercial pilot-scale operation and complete the preliminary design for the pilot plant to be built and operated in Phase 2, complete a NEPA evaluation, and develop a comprehensive carbon life cycle analysis. The objective of Phase 2b was to build the pilot plant to be operated and tested in Phase 2c.

  16. Restoration of uranium solution mining deposits

    International Nuclear Information System (INIS)

    DeVries, F.W.; Lawes, B.C.

    1981-01-01

    Ammonium carbonates are commonly used as the lixiviant for in-situ leaching of uranium ores. However this leads to the deposition of ammonium ions in the uranium ore formation and the problem of ammonia contamination of ground water which may find its way into the drinking water supply. The ammonia contamination of the ore deposit may be reduced by injecting an aqueous solution of a potassium salt (carbonate, bicarbonate, halide, sulfate, bisulfate, persulfate, or monopersulfate) into the deposit after mining has ceased

  17. The role of outsourcing in the project house - mining house relationship

    OpenAIRE

    2008-01-01

    M.Phil. The relationship between the Mining House / Owner and Project House can be spectacularly successful for both partners (and has resulted in the emergence of a few successful new project houses and plant operation companies all over the world), but can also be disastrous for both parties, if managed incorrectly. The main requirement for a successful relationship between a Mining- and Project House is that there must be something in it for both parties. This is not only measured in cu...

  18. Data mining with SPSS modeler theory, exercises and solutions

    CERN Document Server

    Wendler, Tilo

    2016-01-01

    Introducing the IBM SPSS Modeler, this book guides readers through data mining processes and presents relevant statistical methods. There is a special focus on step-by-step tutorials and well-documented examples that help demystify complex mathematical algorithms and computer programs. The variety of exercises and solutions as well as an accompanying website with data sets and SPSS Modeler streams are particularly valuable. While intended for students, the simplicity of the Modeler makes the book useful for anyone wishing to learn about basic and more advanced data mining, and put this knowledge into practice.

  19. 76 FR 41192 - Mines Management Inc. Montanore Project, Kootenai National Forest, Lincoln County, MT

    Science.gov (United States)

    2011-07-13

    ... DEPARTMENT OF AGRICULTURE Forest Service Mines Management Inc. Montanore Project, Kootenai... can be reviewed at: http://www.fs.fed.usda.gov/goto/kootenai/projects . Mines Management Inc. owns two... of Environmental Quality, issued a Draft Environmental Impact Statement for the Montanore Project. In...

  20. PERMEABLE TREATMENT WALL EFFECTIVENESS MONITORING PROJECT, NEVADA STEWART MINE

    Science.gov (United States)

    This report summarizes the results of Mine Waste Technology Program (MWTP) Activity III, Project 39, Permeable Treatment Wall Effectiveness Monitoring Project, implemented and funded by the U.S. Environmental Protection Agency (EPA) and jointly administered by EPA and the U.S. De...

  1. Preliminary evaluation of solution-mining intrusion into a salt-dome repository

    International Nuclear Information System (INIS)

    1981-06-01

    This report is the product of the work of an ONWI task force to evaluate inadvertant human intrusion into a salt dome repository by solution mining. It summarizes the work in the following areas: a general review of the levels of defense that could reduce both the likelihood and potential consequences of human intrusion into a salt dome repository; evaluation of a hypothetical intrusion scenario and its consequences; recommendation for further studies. The conclusions of this task force report can be summarized as follows: (1) it is not possible at present to establish with certainty that solution mining is credible as a human-intrusion event. The likelihood of such an intrusion will depend on the effectiveness of the preventive measures; (2) an example analysis based on the realistic approach is presented in this report; it concluded that the radiological consequences are strongly dependent upon the mode of radionuclide release from the waste form, time after emplacement, package design, impurities in the host salt, the amount of a repository intercepted, the solution mining cavity form, the length of time over which solution mining occurs, the proportion of contaminated salt source for human consumption compared to other sources, and the method of salt purification for culinary purposes; (3) worst case scenarios done by other studies suggest considerable potential for exposures to man while preliminary evaluations of more realistic cases suggest significantly reduced potential consequences. Mathematical model applications to process systems, guided by more advanced assumptions about human intrusion into geomedia, will shed more light on the potential for concerns and the degree to which mitigative measures will be required

  2. The environmental cost in the mining projects; El costo ambiental en los proyectos mineros

    Energy Technology Data Exchange (ETDEWEB)

    Antonio, Gaviria Rivera

    1992-07-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence.

  3. Sustainable Mining Land Use for Lignite Based Energy Projects

    Science.gov (United States)

    Dudek, Michal; Krysa, Zbigniew

    2017-12-01

    This research aims to discuss complex lignite based energy projects economic viability and its impact on sustainable land use with respect to project risk and uncertainty, economics, optimisation (e.g. Lerchs and Grossmann) and importance of lignite as fuel that may be expressed in situ as deposit of energy. Sensitivity analysis and simulation consist of estimated variable land acquisition costs, geostatistics, 3D deposit block modelling, electricity price considered as project product price, power station efficiency and power station lignite processing unit cost, CO2 allowance costs, mining unit cost and also lignite availability treated as lignite reserves kriging estimation error. Investigated parameters have nonlinear influence on results so that economically viable amount of lignite in optimal pit varies having also nonlinear impact on land area required for mining operation.

  4. The North American Bats and Mines Project: a cooperative approach for integrating wildlife, ecosystem management, and mine land reclamation

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, D.A.R. [Bat Conservation International, Austin, TX (United States)

    1995-06-01

    Abandoned underground mines in North America provide a habitat for bats. Closure of mines without conducting biological surveys can endanger bat species that are abundant. The North American Bats and Mines Project (NABMP) has been created by the U.S. Bureau of Land Management and Bat Conservation International to provide coordination among government and conservation organizations and the mining industry in order to minimize the loss of bats living in mines. NABMP provides coordination through education on the importance of mines for bat populations by providing training on mine assessment and closure methods, by assisting with protection and improvement of abandoned mine roosts, and by developing methods for creating new bat habitat. 1 tab.

  5. Problems with Reporting and Evaluating Mining Industry Community Development Projects: A Case Study from Tanzania

    Directory of Open Access Journals (Sweden)

    Esther Wangari

    2012-02-01

    Full Text Available Reporting on contributions to community development is one way gold mining companies communicate the expanse and depth of their commitment to social responsibility. These projects are intended to provide the mine-proximate communities with some of the wealth and other benefits generated by mine development in their locales. We raise questions about reporting and evaluation of community development projects undertaken by AngloGold Ashanti in the two communities of Nyakabale and Nyamalembo, near its Geita mining projects in the Lake Victoria goldfields of Tanzania. We use archival data and data obtained from field research conducted during different periods throughout 2005, 2007 and 2010 to compare what the company reports to have done with what is found on the ground. Our findings revealed that the corporate reporting is misleading, ambiguous, and omissive. Much of the effort labeled “community development” benefited the companies directly via infrastructure development, food supplies to the mine cafeteria, and worker health. We argue that, if Corporate Social Responsibility (CSR projects are to be the primary way local people directly benefit from mine development, the relationship between the value of those projects and the wealth taken from the location should be considered, community projects should be well defined and differentiated from company-oriented projects, and community representatives should participate in monitoring the success and impact of community development projects.

  6. Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of "Podbracan"

    OpenAIRE

    Milutinovic, Aleksandar; Ganic, Aleksandar; Diyab, Thamer Rayes; Tokalic, Rade; Ganic, Meri

    2015-01-01

    Mining projects for mineral resource mining contain in certain cases specific technical and technological solutions, these being the result of the mine’s characteristic spatial position and the geometry of the ore deposit, existing mining works, structures, and terrain relief etc. For the purpose of completion of the mining project, it is necessary to carry out a series of mining and surveying tasks during the pre-project and project stage of mining, as well as during the construction o...

  7. Study of the economic valuation of uranium deposits and mine-projects

    International Nuclear Information System (INIS)

    Alnajim, N.

    1980-01-01

    A basis is provided for the decisions to be made in connection with the exploration, development mining, processing and marketing of the uranium. Details are given about the kinds and forms of the mines, about the exploration-, extraction- and processing technologies as well as the economicly best extractive processing of uranium. The profitability of uranium mining projects is evaluated according to the economy calculation method. (DG) [de

  8. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  9. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  10. Energy utilization in surface mining project : with case study illustration

    International Nuclear Information System (INIS)

    Sinha, D.K.; De, Amitosh

    1992-01-01

    The importance of reducing energy consumption per tonne of output in the mining projects needs an innovative approach and style to change the behaviour and postures of the technical characteristics. The need for suitable energy policy can not be overlooked with the addition of new large size surface mining projects having a lot of technological development. But the immediate prescription to the problem is to pinpoint specific high energy consuming areas prefixed by thorough diagnosis and followed by deep scientific thought into it. To that extent this paper makes a primary attempt to characterise the various problems. (author). 7 tabs

  11. Environmental management of uranium mining projects in Australia - a national perspective

    International Nuclear Information System (INIS)

    Usback, R.

    1987-01-01

    The environmental management of uranium mining projects in Australia is described. The paper reveals that the environmental examination of uranium mining proposals, and the establishment of environmental protection measures for such proposals, have been integrated with other requirements to meet the needs of local communities. (U.K.)

  12. North American Bats and Mines Project: A cooperative approach for integrating bat conservation and mine-land reclamation

    Energy Technology Data Exchange (ETDEWEB)

    Ducummon, S.L. [Bat Conservation International, Austin, TX (United States)

    1997-12-31

    Inactive underground mines now provide essential habitat for more than half of North America`s 44 bat species, including some of the largest remaining populations. Thousands of abandoned mines have already been closed or are slated for safety closures, and many are destroyed during renewed mining in historic districts. The available evidence suggests that millions of bats have already been lost due to these closures. Bats are primary predators of night-flying insects that cost American farmers and foresters billions of dollars annually, therefore, threats to bat survival are cause for serious concern. Fortunately, mine closure methods exist that protect both bats and humans. Bat Conservation International (BCI) and the USDI-Bureau of Land Management founded the North American Bats and Mines Project to provide national leadership and coordination to minimize the loss of mine-roosting bats. This partnership has involved federal and state mine-land and wildlife managers and the mining industry. BCI has trained hundreds of mine-land and wildlife managers nationwide in mine assessment techniques for bats and bat-compatible closure methods, published technical information on bats and mine-land management, presented papers on bats and mines at national mining and wildlife conferences, and collaborated with numerous federal, state, and private partners to protect some of the most important mine-roosting bat populations. Our new mining industry initiative, Mining for Habitat, is designed to develop bat habitat conservation and enhancement plans for active mining operations. It includes the creation of cost-effective artificial underground bat roosts using surplus mining materials such as old mine-truck tires and culverts buried beneath waste rock.

  13. The modernisation of mining

    CSIR Research Space (South Africa)

    Ritchken, E

    2017-10-01

    Full Text Available mechanisms that will entrench the collaboration. The Phakisa had the task of developing collaborative solutions in response to the mining cluster challenges. • Operates through threat • Company focus • Objective is to comply • Company acts... in relative isolation. • Focus on ticking boxes • Focus on individual, easy to measure, projects of limited ambition • Funding through mining company balance sheet. • Creativity unlocked in finding loop- holes in compliance framework – does...

  14. Problems with the application of hydrogeological science to regulation of Australian mining projects: Carmichael Mine and Doongmabulla Springs

    Science.gov (United States)

    Currell, Matthew J.; Werner, Adrian D.; McGrath, Chris; Webb, John A.; Berkman, Michael

    2017-05-01

    Understanding and managing impacts from mining on groundwater-dependent ecosystems (GDEs) and other groundwater users requires development of defensible science supported by adequate field data. This usually leads to the creation of predictive models and analysis of the likely impacts of mining and their accompanying uncertainties. The identification, monitoring and management of impacts on GDEs are often a key component of mine approvals, which need to consider and attempt to minimise the risks that negative impacts may arise. Here we examine a case study where approval for a large mining project in Australia (Carmichael Coal Mine) was challenged in court on the basis that it may result in more extensive impacts on a GDE (Doongmabulla Springs) of high ecological and cultural significance than predicted by the proponent. We show that throughout the environmental assessment and approval process, significant data gaps and scientific uncertainties remained unresolved. Evidence shows that the assumed conceptual hydrogeological model for the springs could be incorrect, and that at least one alternative conceptualisation (that the springs are dependent on a deep fault) is consistent with the available field data. Assumptions made about changes to spring flow as a consequence of mine-induced drawdown also appear problematic, with significant implications for the spring-fed wetlands. Despite the large scale of the project, it appears that critical scientific data required to resolve uncertainties and construct robust models of the springs' relationship to the groundwater system were lacking at the time of approval, contributing to uncertainty and conflict. For this reason, we recommend changes to the approval process that would require a higher standard of scientific information to be collected and reviewed, particularly in relation to key environmental assets during the environmental impact assessment process in future projects.

  15. Process for the reduction of competitive oxidant consuming reactions in the solution mining of a mineral

    International Nuclear Information System (INIS)

    Stover, D.E.

    1980-01-01

    The present invention relates to an improved method for the solution mining of a mineral from a subterranean formation. More specifically, the invention relates to an improved method which enhances significantly the recovery of the mineral from a subterranean formation via solution mining by reducing the oxidant consuming reactions which compete with the mineral for the oxidant injected therein

  16. Metagenomic exploration of microbial community in mine tailings of Malanjkhand copper project, India

    Directory of Open Access Journals (Sweden)

    Abhishek Gupta

    2017-06-01

    Full Text Available Mine tailings from copper mines are considered as one of the sources of highly hazardous acid mine drainage (AMD due to bio-oxidation of its sulfidic constituents. This study was designed to understand microbial community composition and potential for acid generation using samples from mine tailings of Malanjkhand copper project (MCP, India through 16S rRNA gene based amplicon sequencing approach (targeting V4 region. Three tailings samples (T1, T2 and T3 with varied physiochemical properties selected for the study revealed distinct microbial assemblages. Sample (T3 with most extreme nature (pH 3.0 exhibited abundance of Proteobacteria, Fimicutes, Actinobacteria and/or Nitrospirae. Metagenomic sequences are available under the BioProject ID PRJNA361456.

  17. Real Options Analysis of Mining Projects

    OpenAIRE

    Rudolf Zdravlje

    2011-01-01

    When long life assets are being evaluated based on constant predictions of future variables and the assumptions of zero management flexibility, is value being missed? In project evaluation today, the most common evaluation methods that calculate a net present value are discounted cash flow (DCF) analysis, decision tree analysis and Monte Carlo simulation. A fourth method, which is beginning to gain ground in terms of its use in the mining industry, is real option analysis (ROA). ROA utilizes ...

  18. Strategizing Carbon-Neutral Mines: A Case for Pilot Projects

    Directory of Open Access Journals (Sweden)

    Ian M. Power

    2014-05-01

    Full Text Available Ultramafic and mafic mine tailings are a valuable feedstock for carbon mineralization that should be used to offset carbon emissions generated by the mining industry. Although passive carbonation is occurring at the abandoned Clinton Creek asbestos mine, and the active Diavik diamond and Mount Keith nickel mines, there remains untapped potential for sequestering CO2 within these mine wastes. There is the potential to accelerate carbonation to create economically viable, large-scale CO2 fixation technologies that can operate at near-surface temperature and atmospheric pressure. We review several relevant acceleration strategies including: bioleaching of magnesium silicates; increasing the supply of CO2 via heterotrophic oxidation of waste organics; and biologically induced carbonate precipitation, as well as enhancing passive carbonation through tailings management practices and use of CO2 point sources. Scenarios for pilot scale projects are proposed with the aim of moving towards carbon-neutral mines. A financial incentive is necessary to encourage the development of these strategies. We recommend the use of a dynamic real options pricing approach, instead of traditional discounted cash-flow approaches, because it reflects the inherent value in managerial flexibility to adapt and capitalize on favorable future opportunities in the highly volatile carbon market.

  19. UNEXMIN H2020 Project: an underwater explorer for flooded mines

    Science.gov (United States)

    Lopes, Luís; Zajzon, Norbert; Bodo, Balázs; Henley, Stephen; Žibret, Gorazd; Almeida, José; Vörös, Csaba; Horvath, Janos; Dizdarevič, Tatjana; Rossi, Claudio; McLoughlin, Mike

    2017-04-01

    UNEXMIN (Underwater Explorer for Flooded Mines, Grant Agreement No. 690008, www.unexmin.eu) is a project funded by the European Commission's HORIZON2020 Framework Programme. The project is developing a multi-platform robotic system for the autonomous exploration and mapping of Europe's flooded mines. The robotic system - UX-1 - will use non-invasive methods for the 3D mapping of abandoned flooded mines, bringing new important geological and mineralogical data that cannot be currently obtained by any other means. This technology will allow the development or update of geological models at local and regional levels. The data collected will then be used to consider new exploration scenarios for the possible re-opening of some of Europe's abandoned mines which may still contain valuable resources of strategic minerals. The deployment of a multi-robotic system in such a confined environment poses challenges that must be overcome so that the robots can work autonomously, without damaging the equipment and the mine itself. Key challenges are related to the i) structural design for robustness and resilience, ii) localization, navigation and 3D mapping, iii) guidance, propulsion and control, iv) autonomous operation and supervision, v) data processing, interpretation and evaluation. The scientific instrument array is currently being tested, built and tailored for the submersible: pH, electrical conductivity, pressure and temperature analyzers and a water sampler (water sampling methods), a magnetic field analyzer, a gamma-ray counter and a sub-bottom profiler (geophysical methods) and a multispectral and UV fluorescence imaging units (optical observation methods). The instruments have been selected to generate data of maximum geoscientific interest, considering the limiting factors of the submerged underground environment, the necessary robotic functions, the size for the robot and other constraints. Other crucial components for the robot's functionality (such as movement

  20. Mining the multigroup-discrete ordinates algorithm for high quality solutions

    International Nuclear Information System (INIS)

    Ganapol, B.D.; Kornreich, D.E.

    2005-01-01

    A novel approach to the numerical solution of the neutron transport equation via the discrete ordinates (SN) method is presented. The new technique is referred to as 'mining' low order (SN) numerical solutions to obtain high order accuracy. The new numerical method, called the Multigroup Converged SN (MGCSN) algorithm, is a combination of several sequence accelerators: Romberg and Wynn-epsilon. The extreme accuracy obtained by the method is demonstrated through self consistency and comparison to the independent semi-analytical benchmark BLUE. (authors)

  1. Impact of mining projects on the socio-economics of the region

    International Nuclear Information System (INIS)

    Rao, K.R.; Yerpude, R.R.

    1994-01-01

    Mining of mineral deposits, if exploited economically, would generate prospects of significant employment of non-inflationary nature, in developing countries. Exploitation of remotely located mineral deposits contributes in developing inaccessible regions thereby improving socio-economics of the region benefiting the local inhabitants and supplementing the efforts towards national integration. However, an indifferent attitude of the project management towards environment and welfare of local population will result in clash of interests and perpetual litigations which not only impede progress of the project but also lead to law and order problems. A precondition for successful implementation of any project is to understand the possible impact it has, on the socio-economics of the region and educate the local inhabitants to derive optimum advantage from the project. In this paper, two cases of mining projects, one located remotely and the other close to a well developed city are studied and their impact on the socio-economics of the respective regions is presented. 5 refs., 2 figs., 1 tab

  2. Project management in mine actions using Multi-Criteria-Analysis-based decision support system

    Directory of Open Access Journals (Sweden)

    Marko Mladineo

    2014-12-01

    Full Text Available In this paper, a Web-based Decision Support System (Web DSS, that supports humanitarian demining operations and restoration of mine-contaminated areas, is presented. The financial shortage usually triggers a need for priority setting in Project Management in Mine actions. As part of the FP7 Project TIRAMISU, a specialized Web DSS has been developed to achieve a fully transparent priority setting process. It allows stakeholders and donors to actively join the decision making process using a user-friendly and intuitive Web application. The main advantage of this Web DSS is its unique way of managing a mine action project using Multi-Criteria Analysis (MCA, namely the PROMETHEE method, in order to select priorities for demining actions. The developed Web DSS allows decision makers to use several predefined scenarios (different criteria weights or to develop their own, so it allows project managers to compare different demining possibilities with ease.

  3. Environmental impact assessment for uranium mine, mill and in situ leach projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    Environmental impact assessments and/or statements are an inherent part of any uranium mining project and are a prerequisite for the future opening of an exploitation and its final closure and decommissioning. Since they contain all information related to the physical, biological, chemical and economic condition of the areas where industrial projects are proposed or planned, they present invaluable guidance for the planning and implementation of environmental mitigation as well as environmental restoration after the mine is closed. They further yield relevant data on the socio-economic impacts of a project. The present report provides guidance on the environmental impact assessment of uranium mining and milling projects, including in situ leach projects which will be useful for companies in the process of planning uranium developments as well as for the regional or national authorities who will assess such developments. Additional information and advice is given through environmental case histories from five different countries. Those case histories are not meant to be prescriptions for conducting assessments nor even firm recommendations, but should serve as examples for the type and extent of work involved in assessments. A model assessment and licensing process is recommended based on the experience of the five countries. 1 fig., 5 tabs.

  4. Environmental impact assessment for uranium mine, mill and in situ leach projects

    International Nuclear Information System (INIS)

    1997-11-01

    Environmental impact assessments and/or statements are an inherent part of any uranium mining project and are a prerequisite for the future opening of an exploitation and its final closure and decommissioning. Since they contain all information related to the physical, biological, chemical and economic condition of the areas where industrial projects are proposed or planned, they present invaluable guidance for the planning and implementation of environmental mitigation as well as environmental restoration after the mine is closed. They further yield relevant data on the socio-economic impacts of a project. The present report provides guidance on the environmental impact assessment of uranium mining and milling projects, including in situ leach projects which will be useful for companies in the process of planning uranium developments as well as for the regional or national authorities who will assess such developments. Additional information and advice is given through environmental case histories from five different countries. Those case histories are not meant to be prescriptions for conducting assessments nor even firm recommendations, but should serve as examples for the type and extent of work involved in assessments. A model assessment and licensing process is recommended based on the experience of the five countries

  5. Analysis of Economic and Social Effects of Pueblo Viejo Mining Project

    DEFF Research Database (Denmark)

    Parra, Cristian; Pacheco Cueva, Vladimir

    some key recommendations to effectively transform its effects into social capital and an improved level of human development. Current market conditions and new mining projects are providing extraordinary, positive and long term possibilities for improving the social and economic wellbeing in host......The research was conducted during the last quarter of 2010 and the first semester of 2011. It included planning the field work, conducting interviews, collecting data, reviewing secondary sources of information, carrying out analysis, internal and external session discussions and writing up...... the final report. This document contributes to the ongoing understanding of the potential impacts and effects of the Pueblo Viejo mining project on the human development and general progress of the people of Dominican Republic. We explain the most significant and potential effects of the project and provide...

  6. Project development for mining-metallurgical complexes for production of uranium concentrates - an analysis and a methodology

    International Nuclear Information System (INIS)

    Ajuria G, S.; Blanco P, B.; Pena A, J.; Manzanera Q, C.

    1978-10-01

    Activities comprising the development of a project for a mining-metallurgical complex for production of uranium concentrates, from sampling and evaluation of an orebody until plant start-up, are analyzed. The analysis of the orebody, characterization of the ore, bench scale and pilot plant metallurgical studies, environmental studies and economic analyses of the project are described. The mining project and mine preparation and engineering and construction of the plant are reviewed in less detail. The estimated time lapse for the development of a typical project under ideal conditions is 66 months. A bar diagram is included showing an approximate timetable for each activity. (author)

  7. Holistic assessment of a landfill mining pilot project in Austria: Methodology and application.

    Science.gov (United States)

    Hermann, Robert; Baumgartner, Rupert J; Vorbach, Stefan; Wolfsberger, Tanja; Ragossnig, Arne; Pomberger, Roland

    2016-07-01

    Basic technical and economic examinations of Austrian mass waste landfills, concerning the recovery of secondary raw materials, have been carried out by the 'LAMIS - Landfill Mining Austria' pilot project for the first time in Austria. A main focus of the research - the subject of this article - was the first devotion of a pilot landfill to an integrated ecological and economic assessment so that its feasibility could be verified before a landfill mining project commenced. A Styrian mass waste landfill had been chosen for this purpose that had been put into operation in 1979 and received mechanically-biologically pre-treated municipal waste till 2012. The whole assessment procedure was divided into preliminary and main assessment phases to evaluate the general suitability of a landfill mining project with little financial and human resource expense. A portfolio chart, based on a questionnaire, was created for the preliminary assessment that, as a result, has provided a recommendation for subsequent investigation - the main assessment phase. In this case, specific economic criteria were assessed by net present value calculation, while ecological or socio-economic criteria were rated by utility analysis, transferring the result into a utility-net present value chart. In the case of the examined pilot landfill, assessing the landfill mining project produced a higher utility but a lower net present value than a landfill leaving-in for aftercare. Since no clearly preferable scenario could be identified this way, a cost-revenue analysis was carried out in addition that determined a dimensionless ratio: the 'utility - net present value quotient' of both scenarios. Comparing this quotient showed unmistakably that in the overall assessment, 'leaving the landfill in aftercare' was preferable to a 'landfill mining project' in that specific case. © The Author(s) 2016.

  8. A quantitative method for selecting renewable energy projects in the mining industry based on sustainability

    OpenAIRE

    Mostert, M.

    2014-01-01

    Mining companies sponsor a range of non-core, corporate social responsibility projects to adhere to social and labour plans and environmental management prerequisites that form part of a mining licence application. Some companies go above and beyond such projects, sponsoring initiatives that generate renewable energy through solar power, wind energy, natural gas, etc. The challenge for these companies is to choose between a variety of projects to ensure maximum value, especially in times when...

  9. Observational studies to mitigate seismic risks in mines: a new Japanese-South African collaborative research project

    CSIR Research Space (South Africa)

    Durrheim, RJ

    2010-10-01

    Full Text Available and High Stress Mining, 6-8 October 2010, Santiago CHILE 1 Observational studies to mitigate seismic risks in mines: a new Japanese - South African collaborative research project R.J. Durrheim SATREPS*, CSIR Centre for Mining Innovation.... 3. To upgrade the South African national seismic network. The project is carried out under the auspices of the SATREPS (Science and Technology Research Partnership for Sustainable Development) program "Countermeasures towards Global Issues through...

  10. The difficulties in the development of mining tourism projects: the case of La Unión Mining District (SE Spain

    Directory of Open Access Journals (Sweden)

    Héctor M.Conesa

    2010-10-01

    Full Text Available Mine sites are atypical industrial sites because they encompass not only economic but also landscape and anthropologic components. The need of developing new economic opportunities in areas, where a “mining monoculture” was the economic backbone, has resulted in the re-interpretation of mining activity from a cultural viewpoint. Some traditional mining towns from both, recent and ancient times, have forgone mining activity and have become new tourist attractions sites. However, the process of developing tourism in these zones is not easy and necessarily incorporates social, economic and environmental requirements. This paper describes the constraints, possibilities and efforts that meet in the former mining town of La Unión, Southeast Spain. It will be investigated in a critic point of view the current projects that, though in low number, try to preserve the identity and history of the town while generating relatively significant economic incomes.

  11. Recovery of uranium from uranium mine waters and copper ore leaching solutions

    Energy Technology Data Exchange (ETDEWEB)

    George, D R; Ross, J R [Salt Lake City Metallurgy Research Center, Salt Lake City, UT (United States)

    1967-06-15

    Waters pumped from uranium mines in New Mexico are processed by ion exchange to recover uranium. Production is approximately 200 lb U{sub 3}O{sub 8}/d from waters containing 5 to 15 ppm U{sub 3}O{sub 8}. Recoveries range from 80 to 90%. Processing plants are described. Uranium has been found in the solutions resulting from the leaching of copper-bearing waste rock at most of the major copper mines in western United States. These solutions, which are processed on a very large scale for recovery of copper, contain 2 to 12 ppm U{sub 3}O{sub 8}. Currently, uranium is not being recovered, but a potential production of up to 6000 lb U{sub 3}O{sub 8}/d is indicated. Ion exchange and solvent extraction research studies are described. (author)

  12. International exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998. Overseas workshop; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The international exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998, the 'Overseas workshop' has performed exchange in technologies with Australian coal mine engineers. The project refers to the Australian technological levels and needs in coal production, safety control and environment, as well as transfer of the Japanese coal mine technologies. This report summarizes the result of a survey on the engineer exchange project in the coal mine technology area and the possibility of joint researches. The 'overseas workshop' was held in November 1998 for two days in Brisbane City in QLD Province as the 'Japan-Australia coal technology workshop'. The 'Japan-Australia coal technology workshop' gave lectures in five sessions (the basic lecture, Japan-Australia high-speed excavation project, coal mine gas control project, exploration and resources, and development and experience of Japan). It also discussed two themes (mine safety management and rules, and greenhouse effect gases and coal mining). Two coal mines were visited thereafter to deepen the exchange with the Australian coal mine engineers. (NEDO)

  13. Is Toscana A Formal Concept Analysis Based Solution In Web Usage Mining?

    Directory of Open Access Journals (Sweden)

    Dan-Andrei SITAR-TĂUT

    2012-01-01

    Full Text Available Analyzing large amount of data come from web logs represents a complex, but challenging nowadays problem with implication in various fields, thing that lets open a way for theoretically infinite approaches an implementations. The main goal of our paper represents the possibility of applying the formal concept analysis as viable solution of sustaining the web mining process, based on a technological open-source solution called TOSCANA.

  14. A simplified approach to the PROMETHEE method for priority setting in management of mine action projects

    Directory of Open Access Journals (Sweden)

    Marko Mladineo

    2016-12-01

    Full Text Available In the last 20 years, priority setting in mine actions, i.e. in humanitarian demining, has become an increasingly important topic. Given that mine action projects require management and decision-making based on a multi -criteria approach, multi-criteria decision-making methods like PROMETHEE and AHP have been used worldwide for priority setting. However, from the aspect of mine action, where stakeholders in the decision-making process for priority setting are project managers, local politicians, leaders of different humanitarian organizations, or similar, applying these methods can be difficult. Therefore, a specialized web-based decision support system (Web DSS for priority setting, developed as part of the FP7 project TIRAMISU, has been extended using a module for developing custom priority setting scenarios in line with an exceptionally easy, user-friendly approach. The idea behind this research is to simplify the multi-criteria analysis based on the PROMETHEE method. Therefore, a simplified PROMETHEE method based on statistical analysis for automated suggestions of parameters such as preference function thresholds, interactive selection of criteria weights, and easy input of criteria evaluations is presented in this paper. The result is web-based DSS that can be applied worldwide for priority setting in mine action. Additionally, the management of mine action projects is supported using modules for providing spatial data based on the geographic information system (GIS. In this paper, the benefits and limitations of a simplified PROMETHEE method are presented using a case study involving mine action projects, and subsequently, certain proposals are given for the further research.

  15. 78 FR 48713 - Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in...

    Science.gov (United States)

    2013-08-09

    ...] Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in Lea County, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY... Draft Environmental Impact Statement (EIS) for the Ochoa Mine Project (Project) and by this notice is...

  16. Environmental compatibility investigation of the Garzweiler II open cast mine project

    International Nuclear Information System (INIS)

    Oster, A.; Gaertner, D.

    1994-01-01

    Based on an EEC directive, the law on the investigation of ecological compatibility came into force in 1990. With the application of these European directives in national law, investigations to determine the ecological compatibility must now be carried out for projects to exploit brown coal. In this connection and in conjunction with the licensing procedure for Garzweiler II, Rheinbraun in 1992 for the first time compiled data on the investigations carried out to determine the ecological compatibility of an open cast mine. The data on these investigations include information on the necessity of the open cast mine and on alternative projects that have been examined, as well as a description of the project in question as regards its nature and extent. As far as the legally specified protected objects are concerned, i.e. people, water, air, nature (animals and plants, soil, climate and landscape) as well as cultural and other material objects, itemized data are furnished on the development and effects of the project and on countermeasures and the planned traffic and transport concept. (orig.) [de

  17. Risk reduction of international mining projects by means of investor consortia and diversification of external financing

    International Nuclear Information System (INIS)

    Kirchner, C.

    1982-01-01

    Investors and creditors of international mining projects bear specific risks which may be reduced by means of forming investor and financing consortia. Risk is defined for each actor separately. Project risk and investor risk respectively credit risk are useful categories in order to analyze risk reduction. In each case formation of consortia has a positive influence on the economic viability of the project, and thus reduces the project risk. Furthermore, formation of consortia leads to better compliance of the host country of the mining project with the project and financing agreements. Thus, investor and credit risk may be reduced. (orig.) [de

  18. Evaluation and selection of decision-making methods to assess landfill mining projects.

    Science.gov (United States)

    Hermann, Robert; Baumgartner, Rupert J; Vorbach, Stefan; Ragossnig, Arne; Pomberger, Roland

    2015-09-01

    For the first time in Austria, fundamental technological and economic studies on recovering secondary raw materials from large landfills have been carried out, based on the 'LAMIS - Landfill Mining Austria' pilot project. A main focus of the research - and the subject of this article - was to develop an assessment or decision-making procedure that allows landfill owners to thoroughly examine the feasibility of a landfill mining project in advance. Currently there are no standard procedures that would sufficiently cover all the multiple-criteria requirements. The basic structure of the multiple attribute decision making process was used to narrow down on selection, conceptual design and assessment of suitable procedures. Along with a breakdown into preliminary and main assessment, the entire foundation required was created, such as definitions of requirements to an assessment method, selection and accurate description of the various assessment criteria and classification of the target system for the present 'landfill mining' vs. 'retaining the landfill in after-care' decision-making problem. Based on these studies, cost-utility analysis and the analytical-hierarchy process were selected from the range of multiple attribute decision-making procedures and examined in detail. Overall, both methods have their pros and cons with regard to their use for assessing landfill mining projects. Merging these methods or connecting them with single-criteria decision-making methods (like the net present value method) may turn out to be reasonable and constitute an appropriate assessment method. © The Author(s) 2015.

  19. International exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998. Overseas workshop; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The international exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998, the 'Overseas workshop' has performed exchange in technologies with Australian coal mine engineers. The project refers to the Australian technological levels and needs in coal production, safety control and environment, as well as transfer of the Japanese coal mine technologies. This report summarizes the result of a survey on the engineer exchange project in the coal mine technology area and the possibility of joint researches. The 'overseas workshop' was held in November 1998 for two days in Brisbane City in QLD Province as the 'Japan-Australia coal technology workshop'. The 'Japan-Australia coal technology workshop' gave lectures in five sessions (the basic lecture, Japan-Australia high-speed excavation project, coal mine gas control project, exploration and resources, and development and experience of Japan). It also discussed two themes (mine safety management and rules, and greenhouse effect gases and coal mining). Two coal mines were visited thereafter to deepen the exchange with the Australian coal mine engineers. (NEDO)

  20. Method of solution mining subsurface orebodies to reduce restoration activities

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, G.J.

    1984-01-24

    A method of solution mining is claimed wherein a lixiviant containing both leaching and oxidizing agents is injected into the subsurface orebody. The composition of the lixiviant is changed by reducing the level of oxidizing agent to zero so that soluble species continue to be removed from the subsurface environment. This reduces the uranium level of the ground water aquifer after termination of the lixiviant injection.

  1. Possibility of new mining project extracting in conditions of crisis

    Directory of Open Access Journals (Sweden)

    Stanislav Szabo

    2009-03-01

    Full Text Available This paper gives some information about investment in mining company, it specifies project of Strieborná Vein. The project usesinstruments of financial management and it gives a lot of information about cost, taxes, return of investment, incomes and loan. Thatinformation is very important for application of project in Strieborná Vein and they support decision of investors. Strieborná Veinis an example of investment in period of crisis. Gold, silver, copper and iron extracting needs great investment but commodities are toointeresting to invest to them.

  2. Water, not gold : campesinos defining and acting citizenship in the context of mining projects in rural Cajamarca, Peru

    OpenAIRE

    Viitala, Jenni

    2017-01-01

    This thesis is an ethnographic study of the political agency of campesinos, rural inhabitants, who live in the area of many large mining projects in the Andean region of Cajamarca, Peru. The main focus is on gold mining projects called Yanacocha and Conga. Yanacocha is currently the largest gold producer in South America, and Conga is a proposed offshoot of the current mine. The Conga project was halted, yet not cancelled in 2011 partly due to local resistance. Since the locals were able to a...

  3. ANFO bulk loading in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Gajjar, A.

    1987-08-01

    With India's total coal production projected to increase from 152 to 237 million tons by 1990, net additional production from new mines must be more because of substantial depletion in existing mines. This article discusses the best possible application of explosive techniques in open-cast coal mines to economize production cost. The most energy-efficient and safest explosive is ANFO (ammonium nitrate, fuel oil); however, manual charging by INFO is not possible. Therefore, the solution is the application of bulk-loading systems of ANFO for giant mining operations. Cost of blasting per ton of coal production in India is in the range of Rs 25. Thus, the author suggests it will be the responsibility of mining engineers to see that the ANFO based bulk-loading system is implemented and the cost of production per ton reduced to Rs 19.50.

  4. False alarms and mine seismicity: An example from the Gentry Mountain mining region, Utah. Los Alamos Source Region Project

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, S.R.

    1992-09-23

    Mining regions are a cause of concern for monitoring of nuclear test ban treaties because they present the opportunity for clandestine nuclear tests (i.e. decoupled explosions). Mining operations are often characterized by high seismicity rates and can provide the cover for excavating voids for decoupling. Chemical explosions (seemingly as part of normal mining activities) can be used to complicate the signals from a simultaneous decoupled nuclear explosion. Thus, most concern about mines has dealt with the issue of missed violations to a test ban treaty. In this study, we raise the diplomatic concern of false alarms associated with mining activities. Numerous reports and papers have been published about anomalous seismicity associated with mining activities. As part of a large discrimination study in the western US (Taylor et al., 1989), we had one earthquake that was consistently classified as an explosion. The magnitude 3.5 disturbance occurred on May 14, 1981 and was conspicuous in its lack of Love waves, relative lack of high- frequency energy, low Lg/Pg ratio, and high m{sub b} {minus} M{sub s}. A moment-tensor solution by Patton and Zandt (1991) indicated the event had a large implosional component. The event occurred in the Gentry Mountain coal mining region in the eastern Wasatch Plateau, Utah. Using a simple source representation, we modeled the event as a tabular excavation collapse that occurred as a result of normal mining activities. This study raises the importance of having a good catalogue of seismic data and information about mining activities from potential proliferant nations.

  5. Achieving the projected capacity of the Stanyantsi mine

    Energy Technology Data Exchange (ETDEWEB)

    Dragiev, D

    1979-07-01

    Equipment includes 2 Skoda excavators, one Skoda E-25 power shovel, KraZ dump trucks, graders and S-100 bulldozers. The annual production of 700,000 tons is consumed by the Maritsa-Iztok 2 power plant. To increase production and eventually achieve the originally projected output of 1,400,000 tons annually it is necessary to procure an ESh-10/70 power shovel for surface work, employ all available excavating equipment in surface mining and complete an estimate of all needed mining equipment. The new exploitation plan calls for a reorganization of surface levels, realignment of surface drainage, arrangements for employment of two conveyor belts, construction of a service base for the ESh-10/70 power shovel, training of operators and maintenance crews for the ESh-10/70 power shovel, installation of new electric lines and substations and resurfacing access roads with gravel.

  6. Collaborative Data Mining

    Science.gov (United States)

    Moyle, Steve

    Collaborative Data Mining is a setting where the Data Mining effort is distributed to multiple collaborating agents - human or software. The objective of the collaborative Data Mining effort is to produce solutions to the tackled Data Mining problem which are considered better by some metric, with respect to those solutions that would have been achieved by individual, non-collaborating agents. The solutions require evaluation, comparison, and approaches for combination. Collaboration requires communication, and implies some form of community. The human form of collaboration is a social task. Organizing communities in an effective manner is non-trivial and often requires well defined roles and processes. Data Mining, too, benefits from a standard process. This chapter explores the standard Data Mining process CRISP-DM utilized in a collaborative setting.

  7. The relationship with the Other as a platform for discussion about conflicts. Comments on the Orzesze coal mine project

    Directory of Open Access Journals (Sweden)

    Belzyt Joanna Iza

    2017-06-01

    Full Text Available An analysis was made of comments in media reports on the selected case, the „Orzesze” mining project, posted by Internet users on news websites during the period July 2014 - December 2016 This article is an attempt to examine the relationship with the Other/Alien when thinking about conflicts around investment projects which will interfere with the surrounding social and natural environment. The article considers the theories on the sources of conflict and the development of the conflict process and its consequences and suggests possible courses of action to prevent the escalation of such conflicts particularly with respect to the “Orzesze” mining project in the Upper Silesia, Poland. Taking into account that the Data, Relationship, Value, and Interest conflicts can all be sources of conflict, it should be underlined that good social communication is extremely important in the prevention and resolution of conflicts and the mitigation of their destructive influence. In a cooperation/communication oriented environment it would be much easier to focus on finding solutions rather than finding the guilty party as this can lead to an escalation of the conflict as searching for the guilty party is inextricably linked with the desire to win or to take revenge.

  8. Observational study to mitigate seismic risks in mines: a new Japanese-South African collaborative project

    CSIR Research Space (South Africa)

    Durrheim, RJ

    2009-09-01

    Full Text Available Mining-induced earthquakes pose a hazard to workers in deep South African mines, while natural earthquakes pose a hazard to people living close to plate boundaries. Researchers introduce a 5-year Japanese-South African collaborative project entitled...

  9. Kiruna research mine

    Energy Technology Data Exchange (ETDEWEB)

    Oestensen, A

    1983-12-01

    The research mine at Kiruna is the first large-scale mining research project sponsored by the Swedish government. Under the leadership of the Swedish Mining Research Foundation, a five-year project involving development of new mining systems and machinery will be carried out in cooperation with the Lulea Institute of Technology and a number of Swedish industrial companies.

  10. International mining forum 2004, new technologies in underground mining, safety in mines proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Jerzy Kicki; Eugeniusz Sobczyk (eds.)

    2004-01-15

    The book comprises technical papers that were presented at the International Mining Forum 2004. This event aims to bring together scientists and engineers in mining, rock mechanics, and computer engineering, with a view to explore and discuss international developments in the field. Topics discussed in this book are: trends in the mining industry; new solutions and tendencies in underground mines; rock engineering problems in underground mines; utilization and exploitation of methane; prevention measures for the control of rock bursts in Polish mines; and current problems in Ukrainian coal mines.

  11. Options report for the mining, non-ferrous metal smelting and refining industry

    International Nuclear Information System (INIS)

    1999-10-01

    This plant level analysis involved the study of three Canadian mines from ore extraction to refining. Energy consumption and GHG emissions from each facility were examined, along with projects to reduce these emissions. Results showed variation in emissions between firms by orders of magnitude, and while GHG reducing projects do exist, many are not implemented for economic and business reasons. Nevertheless, a modelling analysis of the mining industry as a whole showed that the industry should be able to reduce its GH emissions to within range of the Kyoto target. Enhanced voluntary initiatives, already supported by the industry, are seen as the most cost effective means of achieving these emission reductions. Industry experts suggest more effort to be expended on identifying GHG reducing technologies and competing projects with higher returns on investment. There is incontrovertible evidence that energy efficiency measures are often not implemented by the industry because their return on investment are not as attractive as those associated with process improvement projects. With appropriate assistance from government, such as funding for comprehensive energy audits similar to the plant level analysis done for this report, funding for carrying out the detailed economic evaluation of these projects, help with specialized human resources to participate in enhanced voluntary activities (such as the energy audits and life cycle cost/benefit analysis), and financial incentives to create more attractive returns on investment for energy efficiency/GHG emission reduction projects, the Canadian mining industry will be, and can be, part of the solution towards reducing GHG emissions. Other avenues that could be helpful in this effort include exporting Canadian mining technology to aid in reaching a global solution to a global problem, recognition for the Canadian mining industry for its northern operations, credit for Canada for embodied energy in exports, and recycling to

  12. Analysis on the choice of the most suitable metal prices in a mining investment project

    International Nuclear Information System (INIS)

    Torre, L. de la; Espi, J. a.

    2014-01-01

    The mineral price assigned in mining project design is critical to determining the economic feasibility of a project. Nevertheless, although it is not difficult to find literature about market metal prices, it is much more complicated to achieve a specific methodology for calculating the value or which justifications are appropriate to include. This study presents an analysis of various methods for selecting metal prices and investigates the mechanisms and motives underlying price selections. The results describe various attitudes adopted by the designers of mining investment project, and how the price can be determined not just by means of forecasting also by consideration of other relevant parameters. (Author)

  13. Mercury and Cyanide Contaminations in Gold Mine Environment and Possible Solution of Cleaning Up by Using Phytoextraction

    Directory of Open Access Journals (Sweden)

    NURIL HIDAYATI

    2009-09-01

    Full Text Available Water contamination with heavy metals, mainly mercury and cyanide (CN due to small scale of public mines and large scale of industrial mines have been in concern to residents around the area. Surveys of heavy metal contamination in aquatic environments, such as rivers and paddy fields over two gold mine areas in West Jawa were conducted and possible solution of using indigenous plants for phytoremediation was studied. The results showed that most of the rivers and other aquatic environments were affected by gold mine activities. Rivers, ponds, and paddy fields around illegal public mines were mostly contaminated by mercury in considerably high levels, such as paddy fields in two locations (Nunggul and Leuwijamang, Pongkor were contaminated up to 22.68 and 7.73 ppm of Hg, respectively. Whereas rivers located around large scale industrial mines were contaminated by CN. Possible solution of cleaning up by using green technology of phytoremediation was examined. Some plant species grew in the contaminated sites showed high tolerance and potentially effective in accumulating cyanide or mercury in their roots and above ground portions. Lindernia crustacea (L. F.M., Digitaria radicosa (Presl Miq, Paspalum conjugatum, Cyperus kyllingia accumulated 89.13, 50.93, 1.78, and 0.77 ppm of Hg, respectively. Whereas, Paspalum conjugatum, Cyperus kyllingia accumulated 16.52 and 33. 16 ppm of CN respectively.

  14. Realization of economic evaluation expert system for uranium mine project

    International Nuclear Information System (INIS)

    Wang Haifeng

    1993-01-01

    By studying the EVALUATOR, economic evaluation expert system of uranium mine project, the theoretical fundamentals of expert system, principle of inference mechanism, implementation of knowledge base, realization of explanation mechanism, acquisition of domain knowledge and representation of knowledge were described, especially the subjective Bayes approach for inexact reasoning problem used in EVALUATOR was discussed in detail

  15. The Curse of the Gold: Discourses Surrounding the Project of the Largest Pit-mine in Europe

    Directory of Open Access Journals (Sweden)

    Istvan Egresi

    2011-11-01

    Full Text Available In 1996, a Canadian company started geological explorations in the Rosia Montana area in the Romanian Carpathians. Two years later it formed a joint-venture with a Romanian state company to exploit what is believed to be Europe´s largest gold reserves. However, as of June 2011 extraction has not started yet and it may never start due to the opposition of numerous NGO´s that have pointed out the environmental, social and economic unsustainability of this mining project. This situation is highly unusual for a country that is hungry for foreign investment especially since up until very recently the state had supported any project promising to revitalize its mining sector. This paper will investigate the changes in the discourses surrounding this mining project taking into consideration the effects of globalization and the effects of Romania´s EU membership after 2007.

  16. Economic evaluation of environmental impacts of open cast mining project - an approach

    International Nuclear Information System (INIS)

    Maiti, S.K.; Pathak, K.

    1998-01-01

    Economic valuation of environmental attributes are pragmatic approach to evaluating the impacts and it helps decision makers to arrive at objective decisions on the basis of cost benefit ratio. For determining the physical impact and its quantification, four evaluation methods, namely-market price method, surrogate market price, survey based and cost based approaches are generally used. The present paper reviews the importance of environmental evaluation of impacts of mining and also reviews a few suitable methodologies that could be effectively used for economic evaluation of environmental impacts in open cast mining projects. (author)

  17. Optimization of the recycling process of precipitation barren solution in a uranium mine

    International Nuclear Information System (INIS)

    Long Qing; Yu Suqin; Zhao Wucheng; Han Wei; Zhang Hui; Chen Shuangxi

    2014-01-01

    Alkaline leaching process was adopted to recover uranium from ores in a uranium mine, and high concentration uranium solution, which would be later used in precipitation, was obtained after ion-exchange and elution steps. The eluting agent consisted of NaCl and NaHCO 3 . Though precipitation barren solution contained as high as 80 g/L Na 2 CO 3 , it still can not be recycled due to presence of high Cl - concentration So, both elution and precipitation processes were optimized in order to control the Cl - concentration in the precipitation barren solution to the recyclable concentration range. Because the precipitation barren solution can be recycled by optimization, the agent consumption was lowered and the discharge of waste water was reduced. (authors)

  18. A high-level dynamic analysis approach for studying global process plant availability and production time in the early stages of mining projects

    Directory of Open Access Journals (Sweden)

    Dennis Travagini Cremonese

    Full Text Available Abstract In the early stage of front-end studies of a Mining Project, the global availability (i.e. number of hours a plant is available for production and production (number of hours a plant is actually operated with material time of the process plant are normally assumed based on the experience of the study team. Understanding and defining the availability hours at the early stages of the project are important for the future stages of the project, as drastic changes in work hours will impact the economics of the project at that stage. An innovative high-level dynamic modeling approach has been developed to assist in the rapid evaluation of assumptions made by the study team. This model incorporates systems or equipment that are commonly used in mining projects from mine to product stockyard discharge after the processing plant. It includes subsystems that will simulate all the component handling, and major process plant systems required for a mining project. The output data provided by this high-level dynamic simulation approach will enhance the confidence level of engineering carried out during the early stage of the project. This study discusses the capabilities of the approach, and a test case compared with standard techniques used in mining project front-end studies.

  19. Engineering and commissioning of a uranium mine in Brazil

    International Nuclear Information System (INIS)

    Moraes Barros Filho, F.V. de; Le Mailloux, Y.

    1984-01-01

    After a brief recital of the uranium projects in Brazil, this article describes the part played by engineering in the commissioning of the mining operations of the deposits of Pocos de Caldas, based on an evaluation of the deposit, comprising a study of the design and a comparison of the elaborated versions, a complete draft scheme for the finally chosen solution, and a participation in the check of the detailed investigations and in the erection of the plant, also in the training of the responsible section heads and finally the collaboration with Nuclebras for the starting and developing of the mining operations. The mine is then described with its specific problems, the solutions which have been evolved and the investigations which are carried on with the assistance of engineering. The following points have become clear, the multiplicity of the tasks incumbent on engineering, the necessity of training at the operator's mine qualified engineering representatives, the advantages but also the difficulties of a close cooperation of operator and engineering staff [fr

  20. Treatment of mine water. A German joint project purifies highly charged mine water in Vietnam; Behandlung von Bergbauabwasser. Ein deutsches Verbundprojekt reinigt in Vietnam stark belastete Bergbauabwaesser

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Stefan; Bilek, Felix [GFI Grundwasserforschungsinstitut GmbH, Dresden (Germany); Kochan, Hans-Juergen [eta AG/LUG Enginering GmbH, Cottbus (Germany); Denke, Peter [LMBV international GmbH, Senftenberg (Germany)

    2011-09-15

    As part of the joint project RAME 'Mining and Environment in Vietnam', a pilot plant for the purification of mine water arises in Vietnam. In cooperation with Vietnamese partners, for the first time an active method for the purification of mine water is used in Vang Danh. The research tasks and development activities necessary for the process development are funded in part by the Federal Ministry of Education and Research (Berlin, Federal Republic of Germany). The construction of the mine water treatment plant is described in addition to the specific national conditions.

  1. Microcomputer model for an analysis of the financial feasibility of a mining project

    International Nuclear Information System (INIS)

    Ciruelos, J.; Duchene, M.

    1983-01-01

    The model presented permits a simulation of the predicted profitability of a mining project at the stage of feasibility studies by making use of a simple individual computer, the Apple II. The model presented can be used to treat the following three areas: definition of the mode of financing the project and calculation of the financial flows which make it possible to evaluate the profitability of this project; analysis of sensitivity, which makes it possible to determine the most critical variables for the future of the project; analysis of the risk [fr

  2. Social impact assessment in mining projects in Northern Finland: Comparing practice to theory

    Energy Technology Data Exchange (ETDEWEB)

    Suopajärvi, Leena, E-mail: leena.suopajarvi@ulapland.fi

    2013-09-15

    The paper discusses social impact assessments (SIA) for mining projects in light of the international principles and guidelines for such assessments and the academic literature in the field. The data consist of environmental impact assessment (EIA) programmes and reports for six mining projects that have started up in northern Finland in the 2000s. A first observation is that the role of the SIAs in the EIA programmes and reports studied was quite minor: measured in number of pages, the assessments account for three or four percent of the total. This study analyses the data collection, research methodology and conceptual premises used in the SIAs. It concludes that the assessments do not fully meet the high standards of the international principles and guidelines set out for them: for example, elderly men are over-represented in the data and no efforts were made to identify and bring to the fore vulnerable groups. Moreover, the reliability of the assessments is difficult to gauge, because the qualitative methods are not described and where quantitative methods were used, details such as non-response rates to questionnaires are not discussed. At the end of the paper, the SIAs are discussed in terms of Jürgen Habermas' theory of knowledge interests, with the conclusion that the assessments continue the empirical analytical tradition of the social sciences and exhibit a technical knowledge interest. -- Highlights: • Paper investigates social impact assessments in Finnish mining projects. • Role of social impact assessment is minor in whole EIA-process. • Mining SIAs give the voice for elderly men, vulnerable groups are not identified. • Assessment of SIAs is difficult because of lacking transparency in reporting. • SIAs belong to empirical analytical tradition with technical knowledge interest.

  3. Social impact assessment in mining projects in Northern Finland: Comparing practice to theory

    International Nuclear Information System (INIS)

    Suopajärvi, Leena

    2013-01-01

    The paper discusses social impact assessments (SIA) for mining projects in light of the international principles and guidelines for such assessments and the academic literature in the field. The data consist of environmental impact assessment (EIA) programmes and reports for six mining projects that have started up in northern Finland in the 2000s. A first observation is that the role of the SIAs in the EIA programmes and reports studied was quite minor: measured in number of pages, the assessments account for three or four percent of the total. This study analyses the data collection, research methodology and conceptual premises used in the SIAs. It concludes that the assessments do not fully meet the high standards of the international principles and guidelines set out for them: for example, elderly men are over-represented in the data and no efforts were made to identify and bring to the fore vulnerable groups. Moreover, the reliability of the assessments is difficult to gauge, because the qualitative methods are not described and where quantitative methods were used, details such as non-response rates to questionnaires are not discussed. At the end of the paper, the SIAs are discussed in terms of Jürgen Habermas' theory of knowledge interests, with the conclusion that the assessments continue the empirical analytical tradition of the social sciences and exhibit a technical knowledge interest. -- Highlights: • Paper investigates social impact assessments in Finnish mining projects. • Role of social impact assessment is minor in whole EIA-process. • Mining SIAs give the voice for elderly men, vulnerable groups are not identified. • Assessment of SIAs is difficult because of lacking transparency in reporting. • SIAs belong to empirical analytical tradition with technical knowledge interest

  4. What influences community positions towards nearby mining projects : eight cases from Brazil and Chile

    OpenAIRE

    Maher, Rajiv

    2014-01-01

    This thesis looks at the influences and dynamics of community positions towards nearby mining projects in Brazil and Chile from an affected communities perspective. This subject is important because even after many initiatives and guidance aimed at helping companies to obtain good community relations, also known as a social license to operate (SLO), conflict in many mining community contexts is still prevalent today. In considering this, the thesis draws from Stakeholder, Resou...

  5. Solution (in situ leach) mining of uranium: an overview

    International Nuclear Information System (INIS)

    Kuhaida, A.J. Jr.; Kelly, M.J.

    1978-01-01

    Increases in the demand for and price of uranium have made in-situ mining an attractive alternative to the open-pit and underground U mining methods. Up to 50% of the known ore-bearing sandstone in the western U.S. can be mined using the in-situ mining method. In-situ mining also offers a significant environmental advantage. Restoration of the contaminated groundwater is discussed

  6. Extracting software static defect models using data mining

    Directory of Open Access Journals (Sweden)

    Ahmed H. Yousef

    2015-03-01

    Full Text Available Large software projects are subject to quality risks of having defective modules that will cause failures during the software execution. Several software repositories contain source code of large projects that are composed of many modules. These software repositories include data for the software metrics of these modules and the defective state of each module. In this paper, a data mining approach is used to show the attributes that predict the defective state of software modules. Software solution architecture is proposed to convert the extracted knowledge into data mining models that can be integrated with the current software project metrics and bugs data in order to enhance the prediction. The results show better prediction capabilities when all the algorithms are combined using weighted votes. When only one individual algorithm is used, Naïve Bayes algorithm has the best results, then the Neural Network and the Decision Trees algorithms.

  7. Conversion of a tailing impoundment to a freshwater reservoir, the Eagle Park Reservoir project, Climax Mine, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    Romig, B.R.; Cupp, J.L.; Ford, R.C.

    1999-07-01

    The Climax Molybdenum Mine, located near Leadville, Colorado, is the site of a lengthy mining history spanning more than 80 years. In the 1960's, extraction of molybdenum from oxide ore located adjacent to the massive molybdenite sulfide deposit resulted in the construction of an earthen core dam to impound fine-grained oxide tailing in the Eagle River Valley. Through recognized value of water storage and reclamation opportunities, a tailing removal project was initiated in 1993 to convert the impoundment facilities to a post-mining beneficial land use of developed water resources. An evaluation of the effect residual materials and lake dynamics would have on in-stream water quality was performed. Eagle Park Reservoir stands as a model for future reclamation efforts that involve water delivery to highly sensitive receiving waters. This paper provides a case study on project development, the evolution of water quality assessment, and the regulatory framework that contributed to this project's success.

  8. Problems of the social non-acceptance of mining projects with particular emphasis on the European Union – a literature review

    Directory of Open Access Journals (Sweden)

    Badera Jarosław

    2014-03-01

    Full Text Available Problems of the social non-acceptance of the mining industry (particularly development projects is relatively new, so more widely discussed for a relatively short time. In this paper, an extensive review of worldwide literature on this topic has been presented with special regard to the specificity of the European Union countries, where the NIMBY (Not In My Backyard phenomenon is one of the key reasons for local community opposition. The problem is recognized mainly from the perspective of the mineral industry, but also from the point of view of government, NGOs or local communities. There are case studies, publications in the range of sustainable development, corporate social responsibility, geo-ethics, proposals for new analytical methods (for example multi-criteria and others or effective solutions. The improvement in social acceptance for the mineral industry may be achieved by further development of technological, organizational and scientific methods which minimizes mining influences on the environment and society developing. Modern approach to social issues associated with mineral activity includes also strategies of bilateral communication, mediation/negotiation, cooperation between stakeholders to a larger extent then in the past. However, it is the continuous need of extensive, in-depth social debate on mineral development projects in the European Union, both in energetic and non-energetic branch.

  9. PM2 : a Process Mining Project Methodology

    NARCIS (Netherlands)

    Eck, van M.L.; Lu, X.; Leemans, S.J.J.; Aalst, van der W.M.P.; Zdravkovic, J.; Kirikova, M.; Johannesson, P.

    2015-01-01

    Process mining aims to transform event data recorded in information systems into knowledge of an organisation’s business processes. The results of process mining analysis can be used to improve process performance or compliance to rules and regulations. However, applying process mining in practice

  10. Assessment of trace ground-water contaminants release from south Texas in-situ uranium solution-mining sites

    Energy Technology Data Exchange (ETDEWEB)

    Kidwell, J.R.; Humenick, M.J.

    1981-01-01

    The future of uranium solution mining in south Texas depends heavily on the industry's ability to restore production zone ground water to acceptable standards. This study investigated the extent of trace contaminant solubilization during mining and subsequent restoration attempts, first through a literature search centered on uranium control mechanisms, and then by laboratory experiments simulating the mining process. The literature search indicated the complexity of the situation. The number of possible interactions between indigenous elements and materials pointed on the site specificity of the problem. The column studies evaluated three different production area ores. Uranium, molybdenum, arsenic, vanadium, and selenium were analyzed in column effluents. After simulated mining operations were completed, uranium was found to be the most persistent trace element. However, subsequent ground water flushing of the columns could restore in-situ water to EPA recommended drinking water concentrations. Limited data indicated that ground water flowing through mined areas may solubilize molybdenum present in down gradient areas adjacent to the production zone due to increased oxidation potential of ground water if adequate restoration procedures are not followed.

  11. Application of advanced technologies for uranium mining and processing at Narwapahar and Turamdih projects

    International Nuclear Information System (INIS)

    Puri, R.C.; Verma, R.P.

    1991-01-01

    Uranium Corporation of India Ltd. (UCIL) has started construction work on two mines, one each at Narwapahar and Turamdih Projects and a combined processing plant at Turamdih as a part of the country's ambitious Atomic Energy Programme. The adoption of latest concept of declines as mine entries will enable completion of project in 4 years only and will also allow large scale mechanisation underground. Use of latest world technology of LPD trucks, LHD vehicles, drill jumbos, scissor lift, passenger carrying and service vehicles will result in rapid development progress rates and large production from concentrated work places. Mine lay-out providing access ways in waste to ore bodies and use of high capacity high pressure fans for ventillation will enable adequate control on radon in mine workings. Process Plant has been designed based on experiences of Jaduguda operations and information/data of several most modern operations of overseas countries such as Canada, USA, South Africa, France and Australia. Use of horizontal belt filters for filtration, draught tube-circulators for leaching and Himsley continuous counter current fluidized bed ion exchange system provide high efficiency and flexibility for extraction of uranium together with low capital as well as operation and maintenance costs. The paper details the various methods, processes and equipment giving the benefits derived from each. (author). 1 ref., 10 figs., 2 tabs

  12. SkyMine Beneficial CO2 Use Project

    Energy Technology Data Exchange (ETDEWEB)

    Walters, Jerel [Skyonic Corporation, Austin, TX (United States)

    2016-02-15

    This Final Report addresses accomplishments achieved during Phase 1 and Phase 2 of the SkyMine® Carbon Mineralization Commercial Scale Pilot Project. The primary objectives of this project were to design, construct, and operate a system to capture CO₂ from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO₂ into products having commercial value as an example of Carbon Capture and Beneficial Re-Use, show the economic viability of the CO₂ capture and conversion process, and thereby advance the technology to a level of commercial scale completion with the ability for further proliferation. The project also substantiates market opportunities for the technology by sales of chemicals into existing markets, and has identified opportunities to improve technology performance and reduce costs during the normal course of operations. The primary objectives of Phase 1 of the project were to elaborate proven SkyMine® process chemistry to commercial pilot-scale operation and complete the preliminary design for the pilot plant to be built and operated in Phase 2. During Phase 2, Pilot System Engineering Design, Construction and Testing, supporting research and development was conducted at a field test unit to collect data that aided in detailed designs of the commercial scale pilot unit; final detailed designs were completed; the commercial scale pilot plant is in its final stages of construction; and a test program has been designed and will be implemented to collect data from the facility to evaluate the technical viability of the process for resulting in an overall net reduction in CO2 emitted into the atmosphere through a process that is run and conducted in a carbon negative manner. The objective of Phase 2b was to build the commercial scale pilot plant to be operated and tested in Phase 2c. By June 30, 2015, the plant was +99% constructed and completed.

  13. An empirical study on the critical success factors of small to medium sized projects in a South African mining company

    Directory of Open Access Journals (Sweden)

    Du Randt, Francois Jean

    2014-08-01

    Full Text Available Projects that fail, for whatever reason, can impact negatively on society, organisations, and other stakeholders. A number of researchers have identified various critical success factors (CSFs that can influence the outcome and success of a project. This research therefore aims to determine the CSFs that influence various success measures of small- to medium-sized projects at a South African mining company, Exxaro Resources’ Grootegeluk Coal Mine. Other objectives of this research include determining the extent of the impacts of these CSFs on the different success measures of a project. The investigation suggests that there are correlations among CSFs, and that certain factors impact the outcome of projects far more than others. This research finds that the single most important CSF for small- to medium-sized projects is the selection of a competent project manager. The competent project manager is characterised by a group of interrelated CSF factors: good leadership, commitment, and learning from past experiences. Based on the research results, other CSFs are discussed and explored in order for recommendations to be made on how this mining company, and possibly other organisations, can achieve greater project success.

  14. Use of project management approach for planning of decommissioning activities of a uranium mining site

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Saulo F.Q.; Lage, Ricardo F.; Gomes, Danielle E.; Ogawa, Iukio, E-mail: quintao.saulo@gmail.com, E-mail: rflage@gmail.com, E-mail: danielle@inb.gov.br, E-mail: iukio@inb.gov.br [Indústrias Nucleares do Brasil (INB), Rio de Janeiro, RJ (Brazil)

    2017-07-01

    The decommissioning of nuclear facilities in the fuel cycle is an extremely important factor for the continuity of nuclear program in any country, especially in that countries such as Brazil, where there are some facilities are in process of being dismantled or must be decommissioned in the medium and long term. Since the decommissioning is a process quite complex and expensive and for this reason, it must be handle with modern management practices for so that the chances of success are increased. This work aims to describe the management plan and the strategy adopted for the execution of the decommissioning and environmental remediation (D and ER) activities for the first uranium mine in Brazil, located in the Minas Gerais State and known as Unidade de Tratamento de Minério (UTM). This facility was operated between 1982 and 1995. All the economically recoverable uranium was extracted and nowadays there is no mining activity is underway and there are only research and laboratory activities are running in the site. The conceptual plans for decommissioning and remediation for this unit have been prepared and emergency activities were recommended. These activities are related to studies about drainage acid, ensure safety of dams, adequacy of CAKE II storage conditions and request for operating licenses for the decommissioning from IBAMA and the authorization from CNEN. The majority of the critical factors for decommissioning had their origin due the characteristics of the project have been implemented and has remained due to uncertainties in the decision-making process over time. This project has a set of variables that need to be analyzed considering different aspects as licensing and regulatory framework, radiological, technical and engineering issues, beyond costs, schedule, risks and human resources. In this sense, it was decided to adopt the good practices of project management, published by the Project Management Institute - PMI and to give a differentiated

  15. Use of project management approach for planning of decommissioning activities of a uranium mining site

    International Nuclear Information System (INIS)

    Ribeiro, Saulo F.Q.; Lage, Ricardo F.; Gomes, Danielle E.; Ogawa, Iukio

    2017-01-01

    The decommissioning of nuclear facilities in the fuel cycle is an extremely important factor for the continuity of nuclear program in any country, especially in that countries such as Brazil, where there are some facilities are in process of being dismantled or must be decommissioned in the medium and long term. Since the decommissioning is a process quite complex and expensive and for this reason, it must be handle with modern management practices for so that the chances of success are increased. This work aims to describe the management plan and the strategy adopted for the execution of the decommissioning and environmental remediation (D and ER) activities for the first uranium mine in Brazil, located in the Minas Gerais State and known as Unidade de Tratamento de Minério (UTM). This facility was operated between 1982 and 1995. All the economically recoverable uranium was extracted and nowadays there is no mining activity is underway and there are only research and laboratory activities are running in the site. The conceptual plans for decommissioning and remediation for this unit have been prepared and emergency activities were recommended. These activities are related to studies about drainage acid, ensure safety of dams, adequacy of CAKE II storage conditions and request for operating licenses for the decommissioning from IBAMA and the authorization from CNEN. The majority of the critical factors for decommissioning had their origin due the characteristics of the project have been implemented and has remained due to uncertainties in the decision-making process over time. This project has a set of variables that need to be analyzed considering different aspects as licensing and regulatory framework, radiological, technical and engineering issues, beyond costs, schedule, risks and human resources. In this sense, it was decided to adopt the good practices of project management, published by the Project Management Institute - PMI and to give a differentiated

  16. A MCDM Analysis of the Roşia Montană Gold Mining Project

    Directory of Open Access Journals (Sweden)

    Adriana Mihai

    2015-06-01

    Full Text Available The need and estimated utility for a structured analysis of the Roşia Montană gold exploitation project have been palpable in the Romanian public sphere during the last 15 years and there is a vast amount of conflicting information and opinions on the benefits and risks involved. This article provides a comprehensive decision analysis of the Roşia Montană project. Over 100 documents from the past years have been gathered regarding the Roşia Montană mining project, which cover the main official, formal and less formal documents covering the case and produced by a wide range of stakeholders. These were then analyzed while designing a multi-criteria tree including the relevant perspectives under which the most commonly discussed four alternatives were analyzed. The result of this can be translated into a valuable recommendation for the mining company and for the political decision-makers. If these stakeholders want the continuation of the project and its acceptance by civil society, the key challenge is to increase the transparency of the process and improve the credibility and legal aspects; if these aspects cannot be met, the decision-makers need to pay attention to the alternatives available for a sustainable development in the area.

  17. Surveys for detection and measurement of subsidence resulting from solution mining--why, what and how

    International Nuclear Information System (INIS)

    Piper, T.B.

    1983-01-01

    Subsidence resulting from solution mining is usually expressed at the earth's surface by downwarping or change in elevation. Areas of several tens or hundreds of acres are involved. These settlements can sometimes be accommodated by buildings and other installations if the subsidence is gentle or the area is large. On the other hand, mineral extraction sometimes results in collapse of a relatively small area (on the order of a few acres) known as a sinkhole. The relationship between these two events has not been demonstrated. Subsidence can be detected by measurements made in the area involved by either access or non-access methods. The results provide early warning of surface downwarping and can be used as input in operating decisions. Precise levelling of a network of shallow monuments has shown a high level of applicability to solution mining sites and offers the maximum cost-benefit ratio. Time vs. settlement plots and summary contour maps serve to present the data and identify areas of concern

  18. Observational studies in South African mines to mitigate seismic risks: a mid-project progress report

    CSIR Research Space (South Africa)

    Durrheim, RJ

    2013-10-01

    Full Text Available such as Japan. A 5-year collaborative project entitled "Observational studies in South African mines to mitigate seismic risks" was launched in 2010 to address these risks, drawing on over a century of South African and Japanese research experience... network in the mining districts. Figure 1. Schematic illustration of the research design. Jpn - Japanese researchers; CSIR - Council for Scientific and Industrial Research; CGS - Council for Geoscience The knowledge gained during the course...

  19. Exact angular momentum projection based on cranked HFB solution

    Energy Technology Data Exchange (ETDEWEB)

    Enami, Kenichi; Tanabe, Kosai; Yosinaga, Naotaka [Saitama Univ., Urawa (Japan). Dept. of Physics

    1998-03-01

    Exact angular momentum projection of cranked HFB solutions is carried out. It is reconfirmed from this calculation that cranked HFB solutions reproduce the intrinsic structure of deformed nucleus. The result also indicates that the energy correction from projection is important for further investigation of nuclear structure. (author)

  20. Towards a negotiated solution to conflicts between large-scale and small-scale miners? The Acupan contract mining project in the Philippines

    NARCIS (Netherlands)

    Verbrugge, B.L.P.

    2017-01-01

    Recent decades have witnessed a simultaneous expansion of large-scale mining and artisanal and small-scale mining (ASM). In an increasing number of instances, ASM-operators and mining companies are competing or even clashing over access to mineral deposits. A growing number of experts are now

  1. Instrumentation for mine safety: fire and smoke problems and solutions

    International Nuclear Information System (INIS)

    Stevens, R.B.

    1982-01-01

    Underground fires continue to be one of the most serious hazards to life and property in the mining industry. Although underground mines are analogous to high-rise buildings where persons are isolated from immediate escape or rescue, application of technology to locate and control fire hazards while still in their controllable state is slow to be implemented in underground mines. This paper describes several USBM (Bureau of Mines) safety programs which included in-mine testing with mine fire and smoke sensors, telemetry and instrumentation to develop recommendations for improving mine fire safety. It is hoped that the technology developed during these programs can be added to other programs to provide the mining industry with the necessary fire safety facts. By recognizing fire potentials and being provided with cost-effective, proven components that will perform reliably under the poor environmental conditions of mining, mine operators can provide protection for their working life and property equal to that which they provide for themselves and their families at home. The basis of this report is two USBM programs for fire protection in metal and nonmetal mines and one coal program. The data was collected beginning in May 1974 and continuing through the present with underground tests of a South African fire system installed at Magma Mine in Superior, Arizona, and a computer-assisted, experimental system at Peabody Coal Mine in Pawnee, Illinois

  2. Mining for solutions, extracting discord: corporate social responsibility and canadian mining companies in Latin America

    OpenAIRE

    Stevens, Julie Ann

    2009-01-01

    While the mining industry generates many benefits to society, the industry has in some cases had a detrimental impact on affected communities. This paradox, manifested in the unequal distribution of costs and benefits amongst stakeholders, has prompted widespread scrutiny of the mining industry. Critique of the industry has questioned whether mining provides an economically, environmentally and socially sustainable model of development. Mining companies are increasingly adopting Corporate Soc...

  3. Guidebook on environmental impact assessment for in situ leach mining projects

    International Nuclear Information System (INIS)

    2005-05-01

    Assessment of the potential environmental impact of an in situ leach (ISL) project is the first step in the permission and licensing process. An Environmental Impact Assessment (EIA) serves as the basis for preparing an Environmental Impact Statement (EIS), which in turn identifies the potential environmental and socioeconomic impact of a proposed project and outlines measures to mitigate the impact. The EIS review process serves to inform the public about a proposed project as well as provide regulatory agencies with assurance that ISL technology will comply with environmental standards, and that project sites can be rehabilitated to pre-mining use. This publication provides a step-by-step description of project parameters that must be addressed in conducting an EIA and preparing an EIS. It also includes EIA/EIS case histories for current operations in Australia, the Czech Republic, Kazakhstan and the United States of America. The publication will be useful to companies considering development of ISL projects and to regulatory personnel who are responsible for writing environmental regulations and licensing ISL projects

  4. Reuse and Securing of Mining Waste : Need of the hour

    Science.gov (United States)

    Mehta, Neha; Dino, Giovanna; Ajmone-Marsan, Franco; De Luca, Domenico Antonio

    2016-04-01

    agricultural soils can depend on Bio-accumulation factor, Translocation factor of heavy metals, species of plant grown and type of the natural biota of the surroundings and effect of different exposure routes. This also leads to the fact that more research is required in this area. Accordingly the same problem statement was chosen as part of a PhD research Project. The PhD research is part of REMEDIATE project (A Marie Sklodowska-Curie Action Initial Training Network for Improved decision making in contaminated land site investigation and risk assessment, Grant Agreement No. 643087). In this project the researcher will select a mining site in Italy to find possible solutions to the environmental impact of mining waste collected there. The project will focus on 1) physical and chemical characterization of waste 2)environmental risk assessment study of the mining waste 3) impact of mining waste on water bodies and soil 4) to discover possible routes of reuse and recovery of minerals from the waste. Thus project focuses on environmental sustainability of mining waste reuse and clean up. Keywords : Mining waste ; environmental risk assessment ;reuse and recovery.

  5. Management of uranium mining and processing wastes at Turamdih project

    International Nuclear Information System (INIS)

    Puri, R.C.; Verma, R.P.

    1991-01-01

    Based on environmental impact assessment, comprehensive plan for management of wastes has been drawn up. No solid waste from the mine is being disposed off outside the project area. The quantity of waste generated after processing of ore is large because of low content of uranium in the ore. A big tailings pond has been planned in specially selected suitable valley near the plant. No liquid effluents are to be discharged into general surrounding environment. Mine water is to be fed to the process plant. Effluents from tailings pond will be collected in a storage cum evaporation pond. All water from different zones of the project shall be collected in zonal ponds and then pumped to tailings effluent storage pond. All the ponds will be provided with requisite impervious liners. The effluents of the storage pond will be treated for removal of radium and manganese and discharged into monitoring pond. Large surface areas for various ponds are envisaged to take advantage of evaporation with aim for zero discharge. To reduce impact from gaseous emissions, high efficiency dust suppression and extraction systems shall be provided. High stacks have been incorporated for DG set, boiler plants, sulphuric acid plant and dust extraction systems for crushing and grinding section and the quality of discharges will be very much within the prescribed limits. The paper describes the management plan in detail. (author)

  6. Evaluation of groundwater pollution in a mining area using analytical solution: a case study of the Yimin open-pit mine in China.

    Science.gov (United States)

    Li, Tianxin; Li, Li; Song, Hongqing; Meng, Linglong; Zhang, Shuli; Huang, Gang

    2016-01-01

    This study focused on using analytical and numerical models to develop and manage groundwater resources, and predict the effects of management measurements in the groundwater system. Movement of contaminants can be studied based on groundwater flow characteristics. This study can be used for prediction of ion concentration and evaluation of groundwater pollution as the theoretical basis. The Yimin open-pit mine is located in the northern part of the Inner Mongolia Autonomous Region of China. High concentrations of iron and manganese are observed in Yimin open-pit mine because of exploitation and pumping that have increased the concentration of the ions in groundwater. In this study, iron was considered as an index of contamination, and the solute model was calibrated using concentration observations from 14 wells in 2014. The groundwater flow model and analytical solutions were used in this study to forecast pollution concentration and variation trend after calibration. With continuous pumping, contaminants will migrate, and become enriched, towards the wellhead in the flow direction. The concentration of the contaminants and the range of pollution increase with the flow rate increased. The suitable flow rate of single well should be open-pit for the standard value of pollution concentration.

  7. Recent solution of the distributed control and measurement system in the Jeronym Mine - modular system

    Czech Academy of Sciences Publication Activity Database

    Knejzlík, Jaromír; Rambouský, Zdeněk

    2008-01-01

    Roč. 5, č. 2 (2008), s. 205-212 ISSN 1214-9705 R&D Projects: GA ČR GA105/06/0068 Institutional research plan: CEZ:AV0Z30860518 Keywords : Jeronym Mine * geomechanical monitoring * seismological monitoring Subject RIV: DC - Siesmology, Volcanology, Earth Structure

  8. Solution of problems, emerging with the transition to thin seams mining on underground mines

    International Nuclear Information System (INIS)

    Malkin, A.S.; Podshivalov, V.E.; Zhdamirov, V.M.; Kostarev, A.P.; Kulakov, A.N.; Savchenkov, V.E.

    1997-01-01

    The greatest volume of useful carbon-energetical and carbon-technological resources in the countries of the world consists of coal. Most likely, problems of the development of coal wining technology and coal consumption will interest scientists and mining engineers for a long time. Moreover, competing with the petroleum and gas industries becomes increasingly difficult. Considerable increases in coal production in countries with warm climates, and favourable mining and geological conditions also damages the international market for the coal industries of Russia (and Australia, India, and Vietnam). In a situation of critical deficits in both financial and material means in Russia, it is necessary to change the structure of the means of production and investment policies for the development of coal mining at every individual mine. 1 fig

  9. Project X: competitive intelligence data mining and analysis

    Science.gov (United States)

    Gilmore, John F.; Pagels, Michael A.; Palk, Justin

    2001-03-01

    Competitive Intelligence (CI) is a systematic and ethical program for gathering and analyzing information about your competitors' activities and general business trends to further your own company's goals. CI allows companies to gather extensive information on their competitors and to analyze what the competition is doing in order to maintain or gain a competitive edge. In commercial business this potentially translates into millions of dollars in annual savings or losses. The Internet provides an overwhelming portal of information for CI analysis. The problem is how a company can automate the translation of voluminous information into valuable and actionable knowledge. This paper describes Project X, an agent-based data mining system specifically developed for extracting and analyzing competitive information from the Internet. Project X gathers CI information from a variety of sources including online newspapers, corporate websites, industry sector reporting sites, speech archiving sites, video news casts, stock news sites, weather sites, and rumor sites. It uses individual industry specific (e.g., pharmaceutical, financial, aerospace, etc.) commercial sector ontologies to form the knowledge filtering and discovery structures/content required to filter and identify valuable competitive knowledge. Project X is described in detail and an example competitive intelligence case is shown demonstrating the system's performance and utility for business intelligence.

  10. Prairie of mine(s) : cultural reclamation of the Estevan/Bienfait Coalfields

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, S.

    2010-07-01

    A cultural reclamation project was launched in the Bienfait region of southern Saskatchewan where lignite mining has been ongoing since the 1800s. Evidence of 5 surface mines, 2 power stations and thousands of acres of spoil piles remain at the abandoned site. The region also comprises 140 abandoned underground mines and 4 mined-out townsites. The project introduced cultural reclamation into the role of landscape architecture, specifically in the planning and design of reclaimed mining lands. At the present time, the reclamation of post-extractive sites is limited to focusing almost exclusively on ecological factors, but failing to recognize the people and the industrial processes that actively transformed the landscape can disengage people from their past. The project concludes with a proposed master plan in addition to a few site-specific interventions that interrogate and explore the role of experiential, cultural, and historical elements in the reclamation of a site. In doing so, awareness is created about the ways in which various landscapes are manipulated every day in order for people to live in greater comfort.

  11. Fuelcell-Hybrid Mine loader (LHD)

    Energy Technology Data Exchange (ETDEWEB)

    James L Dippo; Tim Erikson; Kris Hess

    2009-07-10

    The fuel cell hybrid mine loader project, sponsored by a government-industry consortium, was implemented to determine the viability of proton exchange membrane (PEM) fuel cells in underground mining applications. The Department of Energy (DOE) sponsored this project with cost-share support from industry. The project had three main goals: (1) to develop a mine loader powered by a fuel cell, (2) to develop associated metal-hydride storage and refueling systems, and (3) to demonstrate the fuel cell hybrid loader in an underground mine in Nevada. The investigation of a zero-emissions fuel cell power plant, the safe storage of hydrogen, worker health advantages (over the negative health effects associated with exposure to diesel emissions), and lower operating costs are all key objectives for this project.

  12. On-Site Radon Detection of Mining-induced Fractures from Overlying Strata to the Surface: A Case Study of the Baoshan Coal Mine in China

    Directory of Open Access Journals (Sweden)

    Wei Zhang

    2014-12-01

    Full Text Available Large-scale longwall mining of shallow coal seams may cause mining-induced fractures that can project completely through to the surface. This could lead to a series of mine safety and environmental issues, further deteriorating the already fragile ecological environment in the Western mining areas in China. Therefore, an accurate and effective understanding of the spatiotemporal evolution law of mining-induced fractures in overlying strata and its relationship to upper aquifers is critical. In this paper, the application of the geophysical-chemical properties of radon in mining engineering is explored as a potential solution to the shortcomings of existing surveying methods. A radioactive measurement method is proposed for the detection of the development of mining-induced fractures from overlying strata to the surface in the Baoshan Coal Mine (BCM. The on-site test indicated that the first weighting step is approximately 60 m, the average periodic weighting step is approximately 20 m, and the influence coverage of the advanced abutment pressure is approximately 30 m. The presented method could be used as an indirect technical support to increase the safety of coal mining by acting as a simple, fast, and reliable method of detecting mining-induced fractures in overlying strata.

  13. Data Mining Web Services for Science Data Repositories

    Science.gov (United States)

    Graves, S.; Ramachandran, R.; Keiser, K.; Maskey, M.; Lynnes, C.; Pham, L.

    2006-12-01

    The maturation of web services standards and technologies sets the stage for a distributed "Service-Oriented Architecture" (SOA) for NASA's next generation science data processing. This architecture will allow members of the scientific community to create and combine persistent distributed data processing services and make them available to other users over the Internet. NASA has initiated a project to create a suite of specialized data mining web services designed specifically for science data. The project leverages the Algorithm Development and Mining (ADaM) toolkit as its basis. The ADaM toolkit is a robust, mature and freely available science data mining toolkit that is being used by several research organizations and educational institutions worldwide. These mining services will give the scientific community a powerful and versatile data mining capability that can be used to create higher order products such as thematic maps from current and future NASA satellite data records with methods that are not currently available. The package of mining and related services are being developed using Web Services standards so that community-based measurement processing systems can access and interoperate with them. These standards-based services allow users different options for utilizing them, from direct remote invocation by a client application to deployment of a Business Process Execution Language (BPEL) solutions package where a complex data mining workflow is exposed to others as a single service. The ability to deploy and operate these services at a data archive allows the data mining algorithms to be run where the data are stored, a more efficient scenario than moving large amounts of data over the network. This will be demonstrated in a scenario in which a user uses a remote Web-Service-enabled clustering algorithm to create cloud masks from satellite imagery at the Goddard Earth Sciences Data and Information Services Center (GES DISC).

  14. Data Mining Solutions for the Business Environment

    OpenAIRE

    Ruxandra-Stefania PETRE

    2013-01-01

    Over the past years, data mining became a matter of considerable importance due to the large amounts of data available in the applications belonging to various domains. Data mining, a dynamic and fast-expanding field, that applies advanced data analysis techniques, from statistics, machine learning, database systems or artificial intelligence, in order to discover relevant patterns, trends and relations contained within the data, information impossible to observe using other techniques. The p...

  15. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  16. Optimized mine ventilation on demand (OMVOD)

    International Nuclear Information System (INIS)

    Anderson, M.

    2009-01-01

    This paper provided an overview of the Optimized Mine Ventilation on Demand (OMVOD) system that is being installed at Xstrata Nickel Rim South Project and at Vale Inco's Totten Mine in Sudbury. The OMVOD system is designed to dynamically monitor and control air quality and quantity in real time and dilute and remove hazardous substances including diesel particulate matter (DPM), carbon monoxide (CO) and nitrous oxide (NO 2 ). It is also designed to control the thermal environment and provide ventilation for humans as well as mobile equipment engine combustion according to regulatory standards. The paper highlighted the OMVOD system optimization of energy, air quality measurement and control and production management of the mines through real time dynamic automation. Topics of discussion included real-time tracking and monitoring of diesel equipment; real-time tracking of underground miners; real-time evaluation of mine ventilation networks; and real-time control and optimization of ventilation equipment. ABB and Simsmart Technologies have joined forces to provide underground mining customers with a ventilation optimization solution. Simsmart's OMVOD provides proven real time/dynamic automation technology to significantly reduce energy costs, provide health and safety benefits as well as major capital cost savings while realizing an increase in production.

  17. Evaluating Water Management Practice for Sustainable Mining

    Directory of Open Access Journals (Sweden)

    Xiangfeng Zhang

    2014-02-01

    Full Text Available To move towards sustainable development, the mining industry needs to identify better mine water management practices for reducing raw water use, increasing water use efficiency, and eliminating environmental impacts in a precondition of securing mining production. However, the selection of optimal mine water management practices is technically challenging due to the lack of scientific tools to comprehensively evaluate management options against a set of conflicting criteria. This work has provided a solution to aid the identification of more sustainable mine water management practices. The solution includes a conceptual framework for forming a decision hierarchy; an evaluation method for assessing mine water management practices; and a sensitivity analysis in view of different preferences of stakeholders or managers. The solution is applied to a case study of the evaluation of sustainable water management practices in 16 mines located in the Bowen Basin in Queensland, Australia. The evaluation results illustrate the usefulness of the proposed solution. A sensitivity analysis is performed according to preference weights of stakeholders or managers. Some measures are provided for assessing sensitivity of strategy ranking outcomes if the weight of an indicator changes. Finally, some advice is given to improve the mine water management in some mines.

  18. Baseline environmental survey of proposed uranium mining projects of Domiasiat, Meghalaya

    International Nuclear Information System (INIS)

    Khathing, D.T.; Myrboh, B.; Nongkynrih, P.; War, S.A.; Marbaniang, D.G.; Iongwai, P.S.

    2005-01-01

    West Khasi Hills District of Meghalaya is identified as having a large and rich deposits of Uranium. However, actual extraction on a commercial scale that may lead to an increase in the socio-economic development of the state in particular and the country in general, is yet to be undertaken. This is due to lack of any baseline environmental survey giving rise to speculative information and causing a fear psychosis in the minds of the locals populace about the negative effects of Uranium mining. A preoperational survey and environmental monitoring of the proposed mining sites and its adjacent areas would establish the baseline status of the natural radioactivity and some chemical constituents in different environmental matrices via. air, water, soil, biota and aquatic ecosystems. The North Eastern Hill University, Shillong, Meghalaya has undertaken the Project funded by DST and BRNS, Department of Atomic Energy, Govt. of India which aims to provide baseline environmental data on ambient air, water and soil quality in and around the proposed Uranium mining site of Domiasiat, West Khasi Hills in the state of Meghalaya. Trace elements (elements like Mg, Zn, Ca, K, Na, Se, As, Fe, Cu, Co, Cr, Ni, Pb, Cd, Mn etc) and the status of the activity in the samples are determined. (author)

  19. FEM-model of the Naesliden Mine: requirements and limitations at the outset of the project. [Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Krauland, N.

    1980-05-15

    The design of any instrument depends entirely on the application planned for the instrument. This applies also to the FEM-representation of the Naesliden Mine. With reference to the aims of the project the requirements on the model are outlined with regard to - simulation of the mining process - modelling with special reference to the aims of the project - comparison of FEM-results with in situ observations to determine the validity of the model. The proposed model is two-dimensional and incorporates joint elements to simulate the weak alteration zone between orebody and sidewall rock. The remainder of the model exhibits linear elastic behaviour. This model is evaluated with respect to the given requirements. The limitations of the chosen model are outlined.

  20. Technical project for a new water purification solution

    Directory of Open Access Journals (Sweden)

    Toma Adina

    2018-01-01

    Full Text Available This research is part of the RO-BG Cross-Border Cooperation Program, project “CLEANDANUBE”, MIS-ETC 653, which has finalised by providing a common strategy to prevent the Danube’s pollution technological risks with oil and oil products. This paper presents a new sustainable water purification solution. A short introduction will be offered and an overview regarding the research and new methods to greening the waste is provided. The theoretical aspects of the centrifugal separation phenomenon are studied and the preliminary project bases were established. The paper conveys the possible constructive variations and the technological implications of those. Ultimately, the technical project for a new water purification solution and conclusions with critical points encountered during the designing phase are presented.

  1. Mines vs reactors: comparison of radiation problems and solutions

    International Nuclear Information System (INIS)

    Bush, W.R.

    1981-01-01

    Radiation protection in uranium mines and nuclear reactors is compared, with the objective of determining if any radiation protection practices which have worked well in one area can be adapted to the other area, especially from reactors to mines since radiation protection is more highly developed in reactors. Several areas are identified where improvements can be made in radiation protection in mines, the most important being improvement in ventilation at the workplace, greater attention to special monitoring during upset conditions, and a need for a substantial increase in radiation protection staff. It is concluded that, although considerable room exists for improvement, the general approach to radiation protection presently being followed seems appropriate for the circumstances encountered in mining

  2. Efficient solutions from HVAC to offgrid

    International Nuclear Information System (INIS)

    Anon.

    2014-01-01

    Rio Tinto and Ingenero recently announced that agreement had been reached for the development of the Weipa Solar Photovoltaic Project in Queensland. First Solar will leverage its expertise in utility-scale grid integration and plant control systems to offer a FuelSmart solution that provides maximum fuel savings while maintaining system reliability. Combined with Ingenero's design and integration experience, the project will generate electricity for Rio Tinto Alcan's Weipa bauxite mine, processing facilities and township on the Western Cape York Peninsula

  3. The DSeis Project: Drilling into Seismogenic zones of M2.0 to M5.5 earthquakes in South African gold mines

    Science.gov (United States)

    Yabe, Y.; Ogasawara, H.; Ito, T.; van Aswegen, G.; Durrheim, R. J.; Cichowicz, A.; Onstott, T. C.; Kieft, T. L.; Boettcher, M. S.; Wiemer, S.; Ziegler, M.; Shapiro, S. A.; Gupta, H. K.; Dight, P.

    2017-12-01

    The DSeis project under ICDP consists of drilling in three mines; MK, TT and C4 mines. Common scientific targets among them are the stress state and the microstructure in the seismogenic zone. In addition to these targets, specific targets in individual mines are detailed below. A M5.5 earthquake occurred beneath the MK mine on 5 August 2014. The hypocenter of this event was 5km depth from the surface. In contrast to the normal faulting of induced earthquakes in mining horizons (planned to evaluate how much is a ratio of microseismicity associated with creation of new fractures. In the C4 mine, there was the site of a previous project, in which the microseismicity monitoring and the stress measurement by the CCBO technique were carried out. A M2.8 earthquake occurred 1 year after the CCBO and its hypocenter was only 100m away from the CCBO site. Due to little mining activity in the source region, the stress state just after the M2.8 event should be preserved. We will measure the stress again. Damage zones that evolved quasi-statically were seen by the microseismicity monitoring. Drilling into these zones would provide a clue to see a difference between faults evolved dynamically and quasi-statically.

  4. Behavior and Release of Nitrogen at Mines and Quarries in Nordic Conditions

    Science.gov (United States)

    Karlsson, Teemu; Neitola, Raisa; Jermakka, Johannes; Merta, Elina; Mroueh, Ulla-Maija

    2015-04-01

    The increased extraction of mineral resources and mining activities creates added pressure on the environmental issues and a proper water management in mining areas in Finland. Among others, nitrogen compounds released from explosives or from mining processes can have a detrimental effect on the environment. Thus, this project aimed at comprehensive understanding on the nitrogen issue in the extractive industry. The project collected essential data on nitrogen compounds present in the environments of mines and quarries, and generated better understanding of the discharge and behaviour of nitrogen compounds in mining areas. The sources and balances of explosives-originated nitrogen compounds at mines and quarries of different sizes were investigated and compared. Additionally, the focus was in 'nitrogen smudging' problem of waste rocks and the intensity, as well as evolution and chemical characteristics of their nitrogen contamination. According to the results, the total load of potential nitrogen to the environment depends on the scale and type of the activity as well as the type of explosives used. The main emission sources of nitrogen are process and dewatering waters. A lysimeter study showed that the explosives originated nitrogen content of left over stones from natural stone quarrying is relatively low and ca. half of the nitrogen is leached within the first weeks after detonation. The "nitrogen smudging" of natural stone quarrying left over stones is relatively low to begin with and enhanced by the rapid flushing by rainwater, thus the residues of explosives should not be considered to prevent the utilization of otherwise mineralogically inert waste rocks of good technical quality. The overall nitrogen management should take into account the background concentrations and sensitivity of the local ecosystem. The research project "Solution for Control of Nitrogen Discharges at Mines and Quarries, (MINIMAN)" was realized during years 2012-2014 as a cooperative

  5. MINE WASTE TECHNOLOGY PROGRAM PREVENTION OF ACID MINE DRAINAGE GENERATION FROM OPEN-PIT HIGHWALLS

    Science.gov (United States)

    This document summarizes the results of Mine Waste Technology Program Activity III, Project 26, Prevention of Acid Mine Drainage Generation from Open-Pit Highwalls. The intent of this project was to obtain performance data on the ability of four technologies to prevent the gener...

  6. Mechanism of groundwater inrush hazard caused by solution mining in a multilayered rock-salt-mining area: a case study in Tongbai, China

    Science.gov (United States)

    Zeng, Bin; Shi, Tingting; Chen, Zhihua; Xiang, Liu; Xiang, Shaopeng; Yang, Muyi

    2018-01-01

    The solution mining of salt mineral resources may contaminate groundwater and lead to water inrush out of the ground due to brine leakage. Through the example of a serious groundwater inrush hazard in a large salt-mining area in Tongbai County, China, this study mainly aims to analyse the source and channel of the inrushing water. The mining area has three different types of ore beds including trona (trisodium hydrogendicarbonate dihydrate, also sodium sesquicarbonate dihydrate, with the formula Na2CO3 × NaHCO3 × 2H2O, it is a non-marine evaporite mineral), glauber (sodium sulfate, it is the inorganic compound with the formula Na2SO4 as well as several related hydrates) and gypsum (a soft sulfate mineral composed of calcium sulfate dihydrate, with chemical formula CaSO4 × 2H2O). Based on characterisation of the geological and hydrogeological conditions, the hydrochemical data of the groundwater at different points and depths were used to analyse the pollution source and the pollutant component from single or mixed brine by using physical-chemical reaction principle analysis and hydrogeochemical simulation method. Finally, a possible brine leakage connecting the channel to the ground was discussed from both the geological and artificial perspectives. The results reveal that the brine from the trona mine is the major pollution source; there is a NW-SE fissure zone controlled by the geological structure that provides the main channels through which brine can flow into the aquifer around the water inrush regions, with a large number of waste gypsum exploration boreholes channelling the polluted groundwater inrush out of the ground. This research can be a valuable reference for avoiding and assessing groundwater inrush hazards in similar rock-salt-mining areas, which is advantageous for both groundwater quality protection and public health.

  7. Best practices for effective partnerships with Aboriginal groups : lessons learned from major Canadian projects in mining and forestry

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, C. [Labrador Inuit Association, NF (Canada)

    2004-07-01

    This PowerPoint presentation provided an update on effective partnerships and best practices reported in Canadian mining, forestry and energy projects. The forestry and mining industries have provided most of the models and best practices for natural resource projects. This presentation described the approach to negotiations for the Voisey's Bay Nickel Project and future steps for commercial success. The lessons learned were also discussed with particular reference to corporate agendas that help advance Aboriginal participation. The presentation outlined the expected results from Voisey's Bay Nickel Company Impact Benefit Agreement with the Labrador Inuit Association and the Innu Nation. The issue of responsible environmental management was also discussed along with long-term opportunities for jobs, education and business opportunities for Newfoundland and Labrador residents. figs.

  8. Cubis AG - for the mining industry and for new markets

    International Nuclear Information System (INIS)

    Hamm, E.

    1994-01-01

    In Germany the research funds for the mining industry will again be cut drastically in future. Cubis must plan and use the remaining research funds in an optimum manner in conjunction with the mining industry itself and also the mining supply industry. Close cooperation and continuous coordination between the research institutes and industrial partners will continue to be necessary for this purpose. Transfer of technology between research and industrial application must take place more smoothly. It is not a question of marketing the implementation of results of individual research and development projects; on the contrary system solutions from one source are required and offered. Long-term business relationships with industrial partners, within the framework of which contract research, advice, engineering, training, etc. can be realised, are desirable. Cubis has undertaken the responsibility to make available services to the mining industry and involve itself in new markets with the released capacities. The success so far achieved by the new company shows that competence and potential to face up to the large tasks exist. Cubis is equipped to tackle the continuous challenge of technology and safety at work, but also the tasks in the raw material and environment sectors in the nineties and is the suitable partner for solution of problems. (orig.)

  9. Direct examination of cadmium bonding in rat tissues dosed with mine wastes and cadmium-containing solutions

    International Nuclear Information System (INIS)

    Diacomanolis, V.; Ng, J. C.; Sadler, R.; Harris, H. H.; Nomura, M.; Noller, B. N.

    2010-01-01

    Direct examination by XANES and EXAFS of metal bonding in tissue can be demonstrated by examining cadmium uptake and bonding in animal tissue maintained at cryogenic temperatures. XANES at the K-edge of cadmium were collected at the Photon Factory Advanced Ring (PF-AR), NW10A beam line at KEK-Tsukuba-Japan. Rats fed with 1g mine waste containing 8-400 mg/kg cadmium per 200g body weight (b.w.) or dosed by oral gavage with either cadmium chloride solution alone (at 6 mg/kg b.w.) or in combination with other salts (As, Cu or Zn), 5 days/week for 6 weeks, had 0.1-7.5 and 8-86 mg/kg cadmium in the liver or kidney, respectively. Rats given intraperitoneally (ip) or intravenously (iv) 1-4 times with 1 mg/kg b.w. cadmium solution had 30-120 mg/kg cadmium in the liver or kidney. Tissues from rats were kept and transferred at cryogenic temperature and XANES were recorded at 20 K. The spectra for rat liver samples suggested conjugation of cadmium with glutathione or association with the sulfide bond (Cd-S) of proteins and peptides. EXAFS of rat liver fed by Cd and Zn solutions showed that Cd was clearly bound to S ligands with an inter-atomic distance of 2.54 A ring for Cd-S that was similar to cadmium sulfide with an inter-atomic distance of 2.52 A ring for Cd-S. Liver or kidney of rats fed with mine wastes did not give an edge in the XANES spectra indicating little uptake of cadmium by the animals. Longer and higher dosing regimen may be required in order to observe the same Cd-S bond in the rat tissue from mine wastes, including confirmation by EXAFS.

  10. Evaluation model of commercial geological exploration and mining development project and analysis of some technical problems in commercial negotiation

    International Nuclear Information System (INIS)

    Yao Zhenkai

    2012-01-01

    A composite evaluation model of commercial geological exploration and mining development project was discussed, this new model consists of polity-economy-technique (PET) synthetic evaluation sub-model and geology-mining-metallurgy (GMM) technique evaluation sub-model. Besides, some key technical problems in commercial negotiation, such as information screening, quoted price and analysis of deadline, were briefly analyzed. (author)

  11. A study of the Bienstock-Zuckerberg algorithm, Applications in Mining and Resource Constrained Project Scheduling

    OpenAIRE

    Muñoz, Gonzalo; Espinoza, Daniel; Goycoolea, Marcos; Moreno, Eduardo; Queyranne, Maurice; Rivera, Orlando

    2016-01-01

    We study a Lagrangian decomposition algorithm recently proposed by Dan Bienstock and Mark Zuckerberg for solving the LP relaxation of a class of open pit mine project scheduling problems. In this study we show that the Bienstock-Zuckerberg (BZ) algorithm can be used to solve LP relaxations corresponding to a much broader class of scheduling problems, including the well-known Resource Constrained Project Scheduling Problem (RCPSP), and multi-modal variants of the RCPSP that consider batch proc...

  12. Government participation in mining projects: Fiscal, financial and regulatory implications for developing countries

    International Nuclear Information System (INIS)

    Padmore, G.

    1992-01-01

    Governments of developing countries may obtain ownership participation in national mining projects in the hope of receiving greater policy control over, financial rewards from, and information about such projects. These objectives could be achieved by using their sovereign authority to tax, regulate and monitor projects more effectively. The principal problem is likely to be the administrative inability fully to enjoy rights that they lawfully possess. As such projects are nearly always controlled by foreign entities, and involve the exploitation of irreplaceable mineral wealth, they may engender feelings of suspicion and hostility. Government participation may sometimes be necessary to mitigate those feelings and to lead to more stable and successful projects. If these political objectives are fully recognized, then government participation may be structured so as to minimize any detrimental effect it might have on the fiscal and financial structure of the project. It may also prove to be a vehicle for future participation by private local interests, thereby eliminating the alien enclave feature generally characteristic of such projects. (author). 9 refs

  13. Mining face equipment

    Energy Technology Data Exchange (ETDEWEB)

    G, Litvinskiy G; Babyuk, G V; Yakovenko, V A

    1981-01-07

    Mining face equipment includes drilling advance wells, drilling using explosives on the contour bore holes, loading and transporting the crushed mass, drilling reinforcement shafts, injecting reinforcement compounds and moving the timber. Camouflet explosives are used to form relaxed rock stress beyond the mining area to decrease costs of reinforcing the mining area by using nonstressed rock in the advance well as support. The strengthening solution is injected through advanced cementing wells before drilling the contour bores as well as through radial cementing wells beyond the timbers following loading and transport of the mining debris. The advance well is 50-80 m.

  14. Report on a joint research project. Japan and the Republic of Kazakhstan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    A joint research project was agreed between the Metal Mining Industry Association of Japan and the Non-ferrous Metal Mining Research Institute for the Eastern Region of the Republic of Kazakhstan on March 15,1995. The project is intended to extract from low-grade ores and mine refuses such useful metals as gold, silver, copper and rare metals by using a method harmonious with environment. Tests and researches are being performed targeting the completion in fiscal 2000. This paper reports the achievements attained in fiscal 1997. Detailed descriptions are given in the report on the column percolation test and the mechanical stirring percolation test for low-grade ores in Nikolayevska, and the mechanical stirring percolation test for mine refuses in Zhezkent. In addition, for the bacteria percolation test, the paper reports execution of the bacteria culture test, and the fundamental percolating condition test using concentrated copper solution. Furthermore, fundamental zinc extraction tests in an extraction test and a reversal extraction test, analysis of gold and silver, a percolation test thereon by using cyanide, and analysis of waste solution were performed with related discussions. (NEDO)

  15. Project-service Solutions in the Yacht Industry: a Value-Chain Analysis

    Directory of Open Access Journals (Sweden)

    Davide Aloini

    2013-10-01

    economic trend, in particular throughout the delivery of integrated project-service solutions in all project life cycle stages. Innovative value offerings encompass a complex network of suppliers and subcontractors that is not stable and is arranged in a sporadic and unpredictable manner. Multiple case studies in the yacht industry were conducted to explore the configuration of project-service solutions. The research constitutes an original contribution to studies on servitization adoption in an industrial project context from an inter-organizational perspective. It emerged that SMEs reorganize themselves, in order to provide flexible on-demand solutions to customers, by including all the capabilities within their network. Newly arising professional roles are oriented to the implementation of smart networks and are focused on service infusion in order to provide increased customer value.

  16. Recycling and reuse of wastewater from uranium mining and milling

    International Nuclear Information System (INIS)

    Xu Lechang; Gao Jie; Zhang Xueli; Wei Guangzhi; Zhang Guopu

    2010-01-01

    Uranium mining/milling process, and the sources, recycling/reuse approach and treatment methods of process wastewater are introduced. The wastewater sources of uranium mining and milling include effluent, raffinate, tailings water, mine discharge, resin form converted solution, and precipitation mother liquor. Wastewater can be recycled/reused for leachant, eluent, stripping solution,washing solution and tailings slurry. (authors)

  17. Modelling financial risk in open pit mine projects: Implications for strategic decision-making

    OpenAIRE

    Abdel Sabour, S.A.; Wood, G.

    2009-01-01

    Strategic decisions in the mining industry are made under multiple technical and market uncertainties. Therefore, to reach the best possible decision, based on information available, it is necessary to integrate uncertainty about the input variables and model financial risk of the project's merit measures. However, this rovides few useful insights to decision-makers unless accompanied by modeling management responses to uncertainty resolutions. It is widely acknowledged that conventional deci...

  18. Mechanism of groundwater inrush hazard caused by solution mining in a multilayered rock-salt-mining area: a case study in Tongbai, China

    Directory of Open Access Journals (Sweden)

    B. Zeng

    2018-01-01

    Full Text Available The solution mining of salt mineral resources may contaminate groundwater and lead to water inrush out of the ground due to brine leakage. Through the example of a serious groundwater inrush hazard in a large salt-mining area in Tongbai County, China, this study mainly aims to analyse the source and channel of the inrushing water. The mining area has three different types of ore beds including trona (trisodium hydrogendicarbonate dihydrate, also sodium sesquicarbonate dihydrate, with the formula Na2CO3  ×  NaHCO3  ×  2H2O, it is a non-marine evaporite mineral, glauber (sodium sulfate, it is the inorganic compound with the formula Na2SO4 as well as several related hydrates and gypsum (a soft sulfate mineral composed of calcium sulfate dihydrate, with chemical formula CaSO4  ×  2H2O. Based on characterisation of the geological and hydrogeological conditions, the hydrochemical data of the groundwater at different points and depths were used to analyse the pollution source and the pollutant component from single or mixed brine by using physical–chemical reaction principle analysis and hydrogeochemical simulation method. Finally, a possible brine leakage connecting the channel to the ground was discussed from both the geological and artificial perspectives. The results reveal that the brine from the trona mine is the major pollution source; there is a NW–SE fissure zone controlled by the geological structure that provides the main channels through which brine can flow into the aquifer around the water inrush regions, with a large number of waste gypsum exploration boreholes channelling the polluted groundwater inrush out of the ground. This research can be a valuable reference for avoiding and assessing groundwater inrush hazards in similar rock-salt-mining areas, which is advantageous for both groundwater quality protection and public health.

  19. Mining exploitation of Imouraren.Complementary studies.Report of synthesis - volume I. and J. Project realization Economics variants and studies

    International Nuclear Information System (INIS)

    1980-07-01

    The object of volume I is to propose a plan for the Imouraren project realization. The study consists essentially of studies realization, supplies and construction and operator particular activities during investment period.This study : technical activities level to be attained and recommended method for their execution, project realization planning and overall complex investment costs mine, processing plant, utilities and general services, town and infrastructures. The aim of the volume J is to present studies result that have been carried out within three main directions : an essay of several procedure variants for the plant ; a modification of mining exploitation planning to minimize the overburden and obtain an average grade of maximum ore during first years functionment and economical studies in order to economically evaluate the project in many cases by calculating the internal rate of profit for many uranium sell prices and by utilizing as base investment costs and functioning project reference [fr

  20. NPV risk simulation of an open pit gold mine project under the O'Hara cost model by using GAs

    Institute of Scientific and Technical Information of China (English)

    Franco-Sepulveda Giovanni; Campuzano Carlos; Pineda Cindy

    2017-01-01

    This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.

  1. Radon releases from Australian uranium mining and milling projects: assessing the UNSCEAR approach.

    Science.gov (United States)

    Mudd, Gavin M

    2008-02-01

    The release of radon gas and progeny from the mining and milling of uranium-bearing ores has long been recognised as a potential radiological health hazard. The standards for exposure to radon and progeny have decreased over time as the understanding of their health risk has improved. In recent years there has been debate on the long-term releases (10,000 years) of radon from uranium mining and milling sites, focusing on abandoned, operational and rehabilitated sites. The primary purpose has been estimates of the radiation exposure of both local and global populations. Although there has been an increasing number of radon release studies over recent years in the USA, Australia, Canada and elsewhere, a systematic evaluation of this work has yet to be published in the international literature. This paper presents a detailed compilation and analysis of Australian studies. In order to quantify radon sources, a review of data on uranium mining and milling wastes in Australia, as they influence radon releases, is presented. An extensive compilation of the available radon release data is then assembled for the various projects, including a comparison to predictions of radon behaviour where available. An analysis of cumulative radon releases is then developed and compared to the UNSCEAR approach. The implications for the various assessments of long-term releases of radon are discussed, including aspects such as the need for ongoing monitoring of rehabilitation at uranium mining and milling sites and life-cycle accounting.

  2. Radon releases from Australian uranium mining and milling projects: assessing the UNSCEAR approach

    International Nuclear Information System (INIS)

    Mudd, Gavin M.

    2008-01-01

    The release of radon gas and progeny from the mining and milling of uranium-bearing ores has long been recognised as a potential radiological health hazard. The standards for exposure to radon and progeny have decreased over time as the understanding of their health risk has improved. In recent years there has been debate on the long-term releases (10,000 years) of radon from uranium mining and milling sites, focusing on abandoned, operational and rehabilitated sites. The primary purpose has been estimates of the radiation exposure of both local and global populations. Although there has been an increasing number of radon release studies over recent years in the USA, Australia, Canada and elsewhere, a systematic evaluation of this work has yet to be published in the international literature. This paper presents a detailed compilation and analysis of Australian studies. In order to quantify radon sources, a review of data on uranium mining and milling wastes in Australia, as they influence radon releases, is presented. An extensive compilation of the available radon release data is then assembled for the various projects, including a comparison to predictions of radon behaviour where available. An analysis of cumulative radon releases is then developed and compared to the UNSCEAR approach. The implications for the various assessments of long-term releases of radon are discussed, including aspects such as the need for ongoing monitoring of rehabilitation at uranium mining and milling sites and life-cycle accounting

  3. The role of School of Mines in regional and national environmental protection endeavours. An outline of past and on-going project activities

    International Nuclear Information System (INIS)

    Sinkala, T; Simukanga, S.

    2002-01-01

    This paper outlines the contribution of the School of Mines in national and regional environmental protection activities. Projects include those undertaken under the Southern African Network for Training on the environment (SANTREN), Southern African Development Community (SADC), the Ministry of Mines and Mineral Development, and the Ministry of Environment and Natural Resources. Issues include mining and the environment, small scale mining, environmental impact assessments, river systems, water quality, air quality and environmental technologies. The paper is concluded by pointing out the efforts by the School to introduce a Mining and Environment Program in the wake of the need to promote public awareness at tertiary level. (authors)

  4. Design and planning of the Henderson Mine ventilation upgrade project

    Energy Technology Data Exchange (ETDEWEB)

    Loring, D.M.; Shea, N.A. [Climax Molybdenum Co., Henderson Operations, Empire, CO (United States)

    2010-07-01

    The average molybdenum ore throughput at the Henderson Mine near Denver, Colorado increased significantly between 2003 and 2007. In response, the Climax Molybdenum Company updated the life-of-mine plan which resulted in significant changes to the ventilation requirements of the mine. This paper outlined the mine and ventilation planning efforts. The design options that were evaluated to upgrade the ventilation system were also described along with the final design that was chosen to support the updated mine plan. The mine uses an exhaust ventilation system in which ventilation is supplied through a service shaft, an intake shaft and a long ore haulage tunnel. Currently, air is exhausted through 2 exhaust shafts. The new reserve model that was completed in 2007 incorporated updated geologic information and mix/dilution models. An evaluation of the new life-of-mine plans and production sequences drove the development of a new ventilation plan that increased the airflow requirements of the mine. The primary design concerns were radon control; reduction of diesel particulate matter; silica dust; blasting and other gases; and climate control. Ventilation requirements were also updated based on the final exposure limits stipulated in the 2008 regulations of the Mine Safety and Health Administration. 4 refs., 11 tabs., 8 figs.

  5. Draft environmental impact statement. Bison basin project, Fremont County, Wyoming

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    Construction and operation of leach uranium mine and recovery plant designed to produce one million lb of U 3 O 8 per year at a rate not to exceed 400,000 lb/y in Fremont County, Wyoming are proposed. The project site would consist of 761 acres lying 50 miles south of Riverton and 30 miles southwest of Jeffery City. The in situ leach process, implemented to mine ore contained in the Laney member of the Green River formation, would involve use of sodium carbonate-bicarbonate solution and an oxidizing agent injected and recovered through a complex of well patterns. Each well pattern would consist of six injection wells surrounding a central production well. Only about 40 acres would be mined, while another 13.5 acres would be excavated for equipment foundations and evaporation ponds. Recycling of mined formation water through a reverse osmosis cleanup system and placing it back into the formation after mining was complete would restore the groundwater system to its former potential. Solid wastes produced by the mining process would be removed to a licensed disposal site. Positive Impacts: Uranium ore produced by the mine and refined by the plant would aid in meeting demand for this resource which is estimated to double to a level of 15,000 tons per year within the next 5 years and to reach 45,000-50,000 tons per year by 1990. Some monetary benefits would accrue to local communities due to local expenditures resulting from construction and operation. Negative Impacts: Project activities would result in displacement of livestock grazing practices from 57 acres of land. Some local deterioration of groundwater quality would be expected, and approximately 240 acre-feet of groundwater would be removed from the aquifer permanently. Radon-222 and other small radioactive emissions would result from the solution mining process

  6. Deactivation and treatment of mine wastewaters and of aqueous solutions discharged in uranium ore treatment and processing

    International Nuclear Information System (INIS)

    Jilek, R.; Prochazka, H.; Fuska, J.; Nemec, P.; Katzer, J.

    1974-01-01

    A description is presented of decontamination and purification of mine wastewaters and water solutions discharged from uranium ore treatment and processing and of the simultaneous removal and concentration of uranium-radium daughters, mainly of 226 Ra and 210 Pb. These elements are incorporated in the mycelium of microorganisms, such as those of the Fungi imperfecti class or are sorbed on the mycelium surface. The mycelia are then mechanically separated from the decontaminated solution, e.g., by filtration, centrifugation or sedimentation. The mycelium may be cultivated in the purified solutions to which nutrients are added, such as carbon, nitrogen and phosphorus in concentrations necessary for the growth of the microorganisms used. The mycelium may be added to the purified solution either in the native or in the dried state. (B.S.)

  7. Error estimates in projective solutions of the radon equation

    International Nuclear Information System (INIS)

    Lubuma, M.S.

    1991-04-01

    The model Radon equation is the integral equation of the second kind defined by the interior limits of the electrostatic double layer potential relative to a curve with one angular point and characterized by the non compactness of the operator with respect to the maximum norm. It is shown that the solution to this equation is decomposable into a regular part and a finite linear combination of intrinsic singular functions. The maximal regularity of the solution and explicit formulae for the coefficients of the singular functions are given. The regularity permits to specify how slow the convergence of the classical projection method is, while the above mentioned formulae lead to modified projection methods of the Dual Singular Function Method type, with better approximations for the solution and for the coefficients of singularities. (author). 23 refs

  8. Mining History and Prezent State of Medieval Mine Jeroným

    Czech Academy of Sciences Publication Activity Database

    Kaláb, Zdeněk; Lednická, Markéta; Hrubešová, E.

    2008-01-01

    Roč. 283, č. 1781 (2008), s. 61-71 ISSN 0372-9508 R&D Projects: GA ČR GA105/06/0068 Institutional research plan: CEZ:AV0Z30860518 Keywords : mining history * geomechanical monitoring * mining water Subject RIV: DC - Siesmology, Volcanology, Earth Structure www.wydawnictvopolitechniki.pl

  9. Using Copulas in the Estimation of the Economic Project Value in the Mining Industry, Including Geological Variability

    Science.gov (United States)

    Krysa, Zbigniew; Pactwa, Katarzyna; Wozniak, Justyna; Dudek, Michal

    2017-12-01

    Geological variability is one of the main factors that has an influence on the viability of mining investment projects and on the technical risk of geology projects. In the current scenario, analyses of economic viability of new extraction fields have been performed for the KGHM Polska Miedź S.A. underground copper mine at Fore Sudetic Monocline with the assumption of constant averaged content of useful elements. Research presented in this article is aimed at verifying the value of production from copper and silver ore for the same economic background with the use of variable cash flows resulting from the local variability of useful elements. Furthermore, the ore economic model is investigated for a significant difference in model value estimated with the use of linear correlation between useful elements content and the height of mine face, and the approach in which model parameters correlation is based upon the copula best matched information capacity criterion. The use of copula allows the simulation to take into account the multi variable dependencies at the same time, thereby giving a better reflection of the dependency structure, which linear correlation does not take into account. Calculation results of the economic model used for deposit value estimation indicate that the correlation between copper and silver estimated with the use of copula generates higher variation of possible project value, as compared to modelling correlation based upon linear correlation. Average deposit value remains unchanged.

  10. Mastering SQL Server 2014 data mining

    CERN Document Server

    Bassan, Amarpreet Singh

    2014-01-01

    If you are a developer who is working on data mining for large companies and would like to enhance your knowledge of SQL Server Data Mining Suite, this book is for you. Whether you are brand new to data mining or are a seasoned expert, you will be able to master the skills needed to build a data mining solution.

  11. A top-down / bottom-up approach for multi-actors and multi-criteria assessment of mining projects for sustainable development. Application on Arlit Uranium mines (Niger)

    International Nuclear Information System (INIS)

    Chamaret, A.

    2007-06-01

    This thesis aims to appraise the relevance of using an hybrid top-down / bottom-up approach to evaluate mining projects in the perspective of sustainable development. With the advent of corporate social responsibility and sustainable development concepts, new social expectations have appeared towards companies that go beyond a sole requirement of profit earning capacity. If companies do not answer to these expectations, they risk to lose their social legitimacy. Traditionally associated with social, environmental, economical and political impacts and risks, mining activity is particularly concerned by these new issues. Whereas mineral resources needs have never been so high, mining companies are now expected to limit their negative effects and to take into account their different audiences' expectations in order to define, together, the terms of their social license to operate. Considering the diversity of issues, scales, actors and contexts, the challenge is real and necessitates tools to better understand issues and to structure dialogues. Based on the Uranium mines of Arlit (Niger) case study, this work shows that associating participatory approaches to structuration tools and literature propositions, appears as an efficient formula to better organize issues diversity and to build a structured dialogue between mining companies and their stakeholders. First Part aims to present the theoretical, institutional and sectorial contexts of the thesis. Second Part exposes work and results of the evaluation carried out in Niger. And, Third Part, shows the conclusions that can be derived from this work and presents a proposal for an evaluation framework, potentially applicable to other mining sites. (author)

  12. Mining planing introduction

    International Nuclear Information System (INIS)

    Toledo, R.D.

    1985-01-01

    Basic concepts concerning mining parameters, plan establishment and typical procedure methods applied throughout the physical execution of mining operations are here determined, analyzed and discussed. Technological and economic aspects of the exploration phase are presented as well as general mathematical and statistical methods for estimating, analyzing and representing mineral deposits which are virtually essential for good mining project execution. The characterization of important mineral substances and the basic parameters of mining works are emphasized in conjunction with long, medium and short term mining planning. Finally, geological modelling, ore reserves calculations and final economic evaluations are considered using a hypothetical example in order to consolidate the main elaborated ideas. (D.J.M.) [pt

  13. PERCEPTION OF SOCIO-ENVIRONMENTAL CONFLICTS IN MINING AREAS: THE CASE OF THE MIRADOR PROJECT IN ECUADOR

    OpenAIRE

    SÁNCHEZ-VÁZQUEZ,LUIS; ESPINOSA,MARÍA GABRIELA; EGUIGUREN,MARÍA BEATRIZ

    2016-01-01

    Abstract In order to analyse the socio-environmental conflicts it is essential to pay attention to people's perception, because environmental problems can lead to different forms of conflict according to local economic and socio-cultural context. The main objective of this research is to determine the perception of the public about the different socio-environmental conflicts in the area of influence of the Mirador Project, the first project of large-scale mining in Ecuador. To do so, a repres...

  14. Green Mines green energy : establishing productive land on mine tailings

    Energy Technology Data Exchange (ETDEWEB)

    Tisch, B.; Zinck, J.; Vigneault, B. [Natural Resources Canada, Ottawa, ON (Canada). CANMET Mining and Mineral Sciences Laboratories

    2009-02-15

    The Green Mines green energy research project was initiated by the CANMET Mining and Mineral Sciences Laboratories of Natural Resources Canada. The objective of the initiative was to demonstrate that organic residuals could be used to remediate mine tailings and establish agriculturally productive land where energy crops such as corn, canola, soy, switchgrass and other species could be grown and harvested specifically as feedstock for the production of green fuels. This paper discussed the scope and progress to date of the Green Mines green energy project. This included discussion about a column leaching study and about effluent treatability and toxicity. Neutralization test results and the results of field trials were presented. The paper concluded with a discussion of next steps. An advisory committee has been established to review annual progress and establish research directions. Overall, preliminary results from the column study suggest that sulphate reduction at the tailings-biosolids interface is occurring, although steady state has not yet been reached after more than one year of testing. 1 tab., 3 figs.

  15. Green Mines green energy : establishing productive land on mine tailings

    International Nuclear Information System (INIS)

    Tisch, B.; Zinck, J.; Vigneault, B.

    2009-01-01

    The Green Mines green energy research project was initiated by the CANMET Mining and Mineral Sciences Laboratories of Natural Resources Canada. The objective of the initiative was to demonstrate that organic residuals could be used to remediate mine tailings and establish agriculturally productive land where energy crops such as corn, canola, soy, switchgrass and other species could be grown and harvested specifically as feedstock for the production of green fuels. This paper discussed the scope and progress to date of the Green Mines green energy project. This included discussion about a column leaching study and about effluent treatability and toxicity. Neutralization test results and the results of field trials were presented. The paper concluded with a discussion of next steps. An advisory committee has been established to review annual progress and establish research directions. Overall, preliminary results from the column study suggest that sulphate reduction at the tailings-biosolids interface is occurring, although steady state has not yet been reached after more than one year of testing. 1 tab., 3 figs

  16. Fiscal 1998 overseas geological structure survey report on the engineer interchange project (coal mine technology field), Indonesia; 1998 nendo kaigai chishitsu kozo nado chosa gijutsusha koryu jigyo (tanko gijutsu bun'ya), Indonesia hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This project aims at improvement of coal mining technology and productivity in Indonesia by Japanese production control technology and business management technology for underground coal mining, through interchange of coal engineers between Japan and Indonesia. This project is composed of the short- term and long-term dispatch project of engineers to Indonesia, and the training project of Indonesian engineers in Japan. In fiscal 1998, the short-term dispatch was made for the training in Indonesia on underground coal mine development (development planning, pit mouth selection, main gallery design, mining system selection, transport planning, ventilation planning, under-river mining, mine water proofing, drainage). The long-term dispatch was made for contact and negotiation with concerned Indonesian organizations, support of the training project, and collection of information on the trend of Indonesian economy and energy, and the present and trend of the coal industry for conducting smooth and effective engineer interchange. (NEDO)

  17. Engineer exchanging project on coal mine technology field in fiscal 1999. International information exchanging project (advance survey on North America); 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Hokubei)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This project has been performed with an intention of making visiting surveys and information collection at coal related organizations in overseas coal producing countries on production technology levels and trends. The project is intended to serve for improvement in the contents of and smooth execution of the engineer exchange project in the 'coal mine technology field. It was carried out by the site surveys. The surveys revealed that the situation of the American coal industry is expected of stable increase in the demand and supply in the future, but the coal price is on the falling trend, and therefore, the industry is compelled to further increase the intensity and enhance the productivity. The industry is strongly influenced by the amended air pollution prevention act and nature destruction problems, hence further coal mine curtailment is estimated. Under such a background, it was found that the long-wall mining process progressing toward larger scale and higher productivity, and the high-wall mining process that provides higher productivity at lower cost and has less impact on the environmental problems can continue development in mountainous areas, particularly in the Appalachian area. The high-wall mining process mines coal at exposed facings on the side of a mountain by using a continuous miner, and transports the coal using machines. (NEDO)

  18. The dispute over the social license for mining projects in La Rioja, Argentina

    Directory of Open Access Journals (Sweden)

    Mariana Sola Álvarez

    2013-11-01

    Full Text Available Since the beginning of this century, projects of transnational corporations design to extract -in a mega scale- gold, silver, copper, and molybdenum are back to interrogate Famatina Valley, located in the northwest of Argentina, in the province of La Rioja. The dispute that is generated around the "social license" of mining projects highlights features of policy matrix and local government backing for extractive activities. At the same time illustrates the content and the potentiality of social resistance. The power of veto from a network of neighbors assemblies and a highly mobilized community in critical moments of the conflict is framed in a process of resistance to mercantilization of commons that travels through Latin America.

  19. A technology map to facilitate the process of mine modernization throughout the mining cycle

    OpenAIRE

    Jacobs, J.; Webber-Youngman, R.C.W.

    2017-01-01

    It is vital for organizations and individual operations to have access to a platform with technology-related information to consider for further research and development. This paper presents a technology map that was created with the purpose of facilitating mine modernization through technological advancement throughout the mining lifecycle/cycle. To achieve this, a platform was created to represent the mining life-cycle that incorporates each of the mining phases, i.e. exploration, project e...

  20. The Effect of Mining Activity on the Occurrence of Mining Tremors in the Safety Shaft Pillar of the Kladno-Mayrau Coal Mine

    Czech Academy of Sciences Publication Activity Database

    Živor, Roman; Buben, Jiří

    16(118) (2000), s. 203-214 ISSN 1211-1910 R&D Projects: GA ČR GA105/96/1065 Institutional research plan: CEZ:AV0Z3046908 Keywords : tremor s * drifting * extraction Subject RIV: DH - Mining, incl. Coal Mining

  1. Governance of project management and capital investments: A case study in Brazil’s mining industry

    Directory of Open Access Journals (Sweden)

    Jose Antonio Sousa Neto

    2012-12-01

    Full Text Available The objective of this paper is to present the results of a survey carried out to evaluate the application of corporate governance practices in the management of capital investments and projects by a Brazilian iron ore mining company in 2011. It addresses the main concepts related to projects and corporate governance, as well as the impacts of the Sarbanes-Oxley Act of 2002 on project management. Data were analyzed and processed using descriptive statistics. It was found that the four core disciplines of project governance: portfolio management, project sponsorship, project management, disclosure and reporting, are present in the organization’s management framework, including the application of controls necessary to ensure the accuracy of financial analysis and future cash flows from the successful completion of capital projects. On the other hand, a discrepancy was found in the disproportionate allocation of resources and staff to mega project management compared to small and medium projects which, as a result, are not completed on schedule and within budget. Deficiencies were also found in the attribution of priorities within the organization’s project portfolio.

  2. Expansion of Neyveli lignite mines

    Energy Technology Data Exchange (ETDEWEB)

    Kasturi, T S

    1982-06-01

    This paper describes activities at Neyveli lignite mines in the Tamil Nadu region of India. The equipment used, in mining and materials handling is described. Problems encountered in the conveyor transport system are described, and the solutions finally adopted are presented.

  3. Survey of nine surface mines in North America. [Nine different mines in USA and Canada

    Energy Technology Data Exchange (ETDEWEB)

    Hayes, L.G.; Brackett, R.D.; Floyd, F.D.

    1981-01-01

    This report presents the information gathered by three mining engineers in a 1980 survey of nine surface mines in the United States and Canada. The mines visited included seven coal mines, one copper mine, and one tar sands mine selected as representative of present state of the art in open pit, strip, and terrace pit mining. The purpose of the survey was to investigate mining methods, equipment requirements, operating costs, reclamation procedures and costs, and other aspects of current surface mining practices in order to acquire basic data for a study comparing conventional and terrace pit mining methods, particularly in deeper overburdens. The survey was conducted as part of a project under DOE Contract No. DE-AC01-79ET10023 titled The Development of Optimal Terrace Pit Coal Mining Systems.

  4. Production scheduling of a lignite mine under quality and reserves uncertainty

    International Nuclear Information System (INIS)

    Galetakis, Michael; Roumpos, Christos; Alevizos, George; Vamvuka, Despina

    2011-01-01

    The effect of uncertainty sources to the stochastic optimization of the combined project of a new surface lignite mine exploitation and power plant operation for electricity generation is investigated. Major sources of uncertainty that were considered are the reserves and the quality of the lignite. Since probability distribution functions for these uncertainties were estimated during the detailed exploration phase of the deposit, the overall goal is then to determine the optimal capacity of the power plant and consequently the optimal production rate of the mine over the time. The optimization objective that was selected is the maximization of the net present value of the project. Emphasis is placed on the sensitivity analysis for the investigation of the effect of quality and reserves uncertainty on project optimization, on the mathematical formulation of risk attitude strategy and on increasing the efficiency of the optimization process by creating a limited set of feasible solutions applying empirical rules. The developed methodology was applied for the determination of the optimal annual production rate of a new surface lignite mine in the area of Ptolemais–Amynteon in Northern Greece. - Highlights: ► Quality and reserves uncertainty affects considerably the production scheduling. ► Stochastic optimization is greatly accelerated by incorporating Taylor's rule. ► Decisions can be made considering different risk level attitudes.

  5. Development of an Enhanced Generic Data Mining Life Cycle (DMLC)

    OpenAIRE

    Hofmann, Markus; Tierney, Brendan

    2017-01-01

    Data mining projects are complex and have a high failure rate. In order to improve project management and success rates of such projects a life cycle is vital to the overall success of the project. This paper reports on a research project that was concerned with the life cycle development for large scale data mining projects. The paper provides a detailed view of the design and development of a generic data mining life cycle called DMLC. The life cycle aims to support all members of data mini...

  6. The Effect of Mining Activity on the Surface in the Safety Shaft Pillar Area of Mayrau Mine

    Czech Academy of Sciences Publication Activity Database

    Živor, Roman; Klos, Pavel; Pechoč, Jiří; Brož, Milan

    M-24(340) (2002), s. 227-235 ISSN 0138-015X. [Polish-Czech-Slovakian Symposium on Mining Geophysics /28./. Niedzica, 11.06.2001-13.06.2001] R&D Projects: GA AV ČR IBS3086005 Institutional research plan: CEZ:AV0Z3046908 Keywords : shaft pillar * mining * surface subsidence Subject RIV: DH - Mining, incl. Coal Mining

  7. Legal Strategies Of Mining Companies To Reduce The Impact Of Outsourcing Contracts: Case Studie Of Minas-Rio Project

    Directory of Open Access Journals (Sweden)

    Maria Tereza Fonseca Dias

    2016-12-01

    Full Text Available This paper deals with the legal strategies to be adopted by mining companies to reduce the effects of outsourcing of mining activity in the region of Conceição do Mato Dentro, Alvorada de Minas and Dom Joaquim, Minas Gerais, Brazil. To delimit the object of study, we used bibliographic research and theoretical reference the bases outlined by the City and Otherness Program. As for the proposals for the solution of the problem, concluded the practice management connected to "compliance" in business and hiring insurance policy as a means to curb the practice as illegal or unlawful outsourcing.

  8. WIRELESS MINE-WIDE TELECOMMUNICATIONS TECHNOLOGY

    Energy Technology Data Exchange (ETDEWEB)

    Zvi H. Meiksin

    2004-03-01

    A comprehensive mine-wide, two-way wireless voice and data communication system for the underground mining industry was developed. The system achieves energy savings through increased productivity and greater energy efficiency in meeting safety requirements within mines. The mine-wide system is comprised of two interfaced subsystems: a through-the-earth communications system and an in-mine communications system. The mine-wide system permits two-way communication among underground personnel and between underground and surface personnel. The system was designed, built, and commercialized. Several systems are in operation in underground mines in the United States. The use of these systems has proven they result in considerable energy savings. A system for tracking the location of vehicles and people within the mine was also developed, built and tested successfully. Transtek's systems are being used by the National Institute of Occupational Safety and Health (NIOSH) in their underground mine rescue team training program. This project also resulted in a spin-off rescue team lifeline and communications system. Furthermore, the project points the way to further developments that can lead to a GPS-like system for underground mines allowing the use of autonomous machines in underground mining operations, greatly reducing the amount of energy used in these operations. Some products developed under this program are transferable to applications in fields other than mining. The rescue team system is applicable to use by first responders to natural, accidental, or terrorist-caused building collapses. The in-mine communications system can be installed in high-rise buildings providing in-building communications to security and maintenance personnel as well as to first responders.

  9. Mines in the Four Corners anticipate growth

    Energy Technology Data Exchange (ETDEWEB)

    Buchsbaum, L.

    2008-02-15

    Productive mines in the southwest deplete reserves, while the government drags its heels on new power projects. Production in Arizona and New Mexico has fallen 18% over the last four years to 34.1 million tons. With Chevron Mining's McKinley mine rapidly depleting its reserves the industry will continue to contract. In the last three years at least three large mines in the Four Corners have terminated operations. Three others remain captive operations: BHP Billiton's San Juan Underground and Navajo Surface operations and Peabody Energy's Kayenta surface mine. In 2006 the Black Mesa mine stopped producing coal. These four mines are isolated from the national railways. Peabody's new El Segundo surface mine near Grants, NM is increasing production. If the planned $3 billion Desert Rock coal-fired power plant is built this will present a new market for the Navajo mine. The article gives details about the state of the aforementioned mines and of the new King II coal mine on the northern periphery of the San Juan basin and discusses the state of plans for the Desert Rock Energy Project. 5 photos.

  10. Transparent data mining for big and small data

    CERN Document Server

    Quercia, Daniele; Pasquale, Frank

    2017-01-01

    This book focuses on new and emerging data mining solutions that offer a greater level of transparency than existing solutions. Transparent data mining solutions with desirable properties (e.g. effective, fully automatic, scalable) are covered in the book. Experimental findings of transparent solutions are tailored to different domain experts, and experimental metrics for evaluating algorithmic transparency are presented. The book also discusses societal effects of black box vs. transparent approaches to data mining, as well as real-world use cases for these approaches. As algorithms increasingly support different aspects of modern life, a greater level of transparency is sorely needed, not least because discrimination and biases have to be avoided. With contributions from domain experts, this book provides an overview of an emerging area of data mining that has profound societal consequences, and provides the technical background to for readers to contribute to the field or to put existing approaches to prac...

  11. Applied data mining for business and industry

    CERN Document Server

    Giudici, Paolo

    2009-01-01

    The increasing availability of data in our current, information overloaded society has led to the need for valid tools for its modelling and analysis. Data mining and applied statistical methods are the appropriate tools to extract knowledge from such data. This book provides an accessible introduction to data mining methods in a consistent and application oriented statistical framework, using case studies drawn from real industry projects and highlighting the use of data mining methods in a variety of business applications. Introduces data mining methods and applications.Covers classical and Bayesian multivariate statistical methodology as well as machine learning and computational data mining methods.Includes many recent developments such as association and sequence rules, graphical Markov models, lifetime value modelling, credit risk, operational risk and web mining.Features detailed case studies based on applied projects within industry.Incorporates discussion of data mining software, with case studies a...

  12. Technical engineers exchange project (coal mine technology field). Training in China; Gijutsusha koryu jigyo (tanko gijutsu bun`ya). Chugoku no kenshu ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Adachi, T. [Japan Coal Energy Center, Tokyo (Japan)

    1998-07-01

    The paper described JCOAL`s project on the exchange of technical coal engineers of China. In the project on sending of engineers to China in the first term, coal mine engineers of Japan (Taiheiyo Coal Mine, Kushiro Works, Training Center) were sent to the Daitun coal-thermal power plant, Peixuan city, Jiangsu province, in September, 1997 to introduce the production control technology in Japan. They contributed to the heightening of productivity in coal mines in China. Eighteen Chinese participated in the training. Mechanization has been comparatively well in progress, and it was 83% in coal mining and 91% in drilling. The kind of coal is mostly a raw material coal. The stuff members are 30,000, and expert engineers are 4,200. The plant has an output of 130,000 kWh, owns its railroad, is run on the general multiple management, and is largely developing. The project on sending of engineers to China in the last term was carried out in February 1998 for tracing/confirming how the results of the training conducted in September are made the most of and if or not there is something bad and for obtaining the detailed data. A certain degree of promotion and effects were able to be confirmed. A project on training of the head, sub-head, etc. who were invited to Japan to lean production/management control was also carried out in November and December 1997. 1 tab.

  13. Laboratory studies on natural restoration of ground water after in-situ leach uranium mining

    International Nuclear Information System (INIS)

    Bell, N.E.; Deutsch, W.J.; Serne, R.J.

    1983-05-01

    When uranium is mined using in-situ leach techniques, the chemical quality of the ground water in the ore-zone aquifer is affected. This could lead to long-term degradation of the ground water if restoration techniques are not applied after the leaching is completed. Pacific Northwest Laboratory (PNL), is conducting an NRC-sponsored research project on natural restoration and induced-restoration techniques. Laboratory studies were designed to evaluate the ability of the natural system (ore-zone sediments and groundwater) to mitigate the effects of mining on aquifer chemistry. Using batch and flow-through column experiments [performed with lixiviant (leaching solution) and sediments from the reduced zone of an ore-zone aquifer], we found that the natural system can lower uranium and bicarbonate concentrations in solutions and reduce the lixiviant redox potential (Eh). The change in redox potential could cause some of the contaminants that were dissolved during the uranium leaching operation to precipitate, thereby lowering their solution concentration. The concentrations of other species such as calcium, potassium, and sulfate increased, possibly as a result of mineral dissolution and ion exchange. In this paper, we describe the experimentally determined mobility of contaminants after in-situ leach mining, and discuss the possible chemical process affecting mobility

  14. Laboratory studies on natural restoration of ground water after in-situ leach uranium mining

    Energy Technology Data Exchange (ETDEWEB)

    Bell, N.E.; Deutsch, W.J.; Serne, R.J.

    1983-05-01

    When uranium is mined using in-situ leach techniques, the chemical quality of the ground water in the ore-zone aquifer is affected. This could lead to long-term degradation of the ground water if restoration techniques are not applied after the leaching is completed. Pacific Northwest Laboratory (PNL), is conducting an NRC-sponsored research project on natural restoration and induced-restoration techniques. Laboratory studies were designed to evaluate the ability of the natural system (ore-zone sediments and groundwater) to mitigate the effects of mining on aquifer chemistry. Using batch and flow-through column experiments (performed with lixiviant (leaching solution) and sediments from the reduced zone of an ore-zone aquifer), we found that the natural system can lower uranium and bicarbonate concentrations in solutions and reduce the lixiviant redox potential (Eh). The change in redox potential could cause some of the contaminants that were dissolved during the uranium leaching operation to precipitate, thereby lowering their solution concentration. The concentrations of other species such as calcium, potassium, and sulfate increased, possibly as a result of mineral dissolution and ion exchange. In this paper, we describe the experimentally determined mobility of contaminants after in-situ leach mining, and discuss the possible chemical process affecting mobility.

  15. Mahoma - Guaycuru project. Mining study possibilities around Mahoma - Guaycuru

    International Nuclear Information System (INIS)

    Coronel, N.; Techera, J.

    1991-01-01

    This work is about the mining study possibilities in Mahoma - Guaycuru mafic complex and the stratified ultramafic complex in the black hill area - San Jose and Colon ia town. These zones have good mining chances because of the geological environment

  16. Uranium mining in Australia: dreams--and reality

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    By the early 1980's if the current mining projects described are allowed to go on stream, Australia will be able to produce at least 10 900 tons of U$sub 3$O$sub 8$ annually from ores whose grade ranges from a low of 0.150% to a high of 2.300%. The Jabiluka Project of uranium mining is described, and plans for other mines are discussed in Queensland, South and Western Australia. 2 refs

  17. Philippine Mining Capitalism: The Changing Terrains of Struggle in the Neoliberal Mining Regime

    Directory of Open Access Journals (Sweden)

    Alvin A. Camba

    2016-06-01

    Full Text Available This article analyzes how the mining sector and anti-mining groups compete for mining outcomes in the Philippines. I argue that the transition to a neoliberal mineral regime has empowered the mining sector and weakened the mining groups by shifting the terrains of struggle onto the domains of state agencies and scientific networks. Since the neoliberal era, the mining sector has come up with two strategies. First, technologies of subjection elevate various public institutions to elect and select the processes aimed at making mining accountable and sensitive to the demands of local communities. However, they often refuse or lack the capacity to intervene effectively. Second, technologies of subjectivities allow a selective group of industry experts to single-handedly determine the environmental viability of mining projects. Mining consultants, specialists, and scientists chosen by mining companies determine the potential environmental damage on water bodies, air pollution, and soil erosion. Because of the mining capital’s access to economic and legal resources, anti-mining communities across the Philippines have been forced to compete on an unequal terrain for a meaningful social dialogue and mining outcomes.

  18. MINE WASTE TECHNOLOGY PROGRAM; PHOSPHATE STABILIZATION OF HEAVY METALS CONTAMINATED MINE WASTE YARD SOILS, JOPLIN, MISSOURI NPL SITE

    Science.gov (United States)

    This document summarizes the results of Mine Waste Technology Project 22-Phosphate Stabilization of Heavy Metals-Contaminated Mine Waste Yard Soils. Mining, milling, and smelting of ores near Joplin, Missouri, have resulted in heavy metal contamination of the area. The Joplin s...

  19. Location of microseismic swarms induced by salt solution mining

    Science.gov (United States)

    Kinscher, J.; Bernard, P.; Contrucci, I.; Mangeney, A.; Piguet, J. P.; Bigarre, P.

    2015-01-01

    Ground failures, caving processes and collapses of large natural or man-made underground cavities can produce significant socio-economic damages and represent a serious risk envisaged by the mine managements and municipalities. In order to improve our understanding of the mechanisms governing such a geohazard and to test the potential of geophysical methods to prevent them, the development and collapse of a salt solution mining cavity was monitored in the Lorraine basin in northeastern France. During the experiment, a huge microseismic data set (˜50 000 event files) was recorded by a local microseismic network. 80 per cent of the data comprised unusual swarming sequences with complex clusters of superimposed microseismic events which could not be processed through standard automatic detection and location routines. Here, we present two probabilistic methods which provide a powerful tool to assess the spatio-temporal characteristics of these swarming sequences in an automatic manner. Both methods take advantage of strong attenuation effects and significantly polarized P-wave energies at higher frequencies (>100 Hz). The first location approach uses simple signal amplitude estimates for different frequency bands, and an attenuation model to constrain the hypocentre locations. The second approach was designed to identify significantly polarized P-wave energies and the associated polarization angles which provide very valuable information on the hypocentre location. Both methods are applied to a microseismic data set recorded during an important step of the development of the cavity, that is, before its collapse. From our results, systematic spatio-temporal epicentre migration trends are observed in the order of seconds to minutes and several tens of meters which are partially associated with cyclic behaviours. In addition, from spatio-temporal distribution of epicentre clusters we observed similar epicentre migration in the order of hours and days. All together, we

  20. Project R43.106: Field trails of a passive dust sampler in mines: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Hemingway, M. [Health and Safety Laboratory, Sheffield (United Kingdom). Environmental Measurement Groups

    1999-12-01

    Electret based passive dust samplers developed by the project were tested in four collieries in the United Kingdom and compared with MRE gravimetric site samplers (Casella type 113A) and CIP10 samplers (Capteur Indivuel de Poussiere 10 made by Arelco, France). Results of site sampling and personal sampling was assessed according to the draft-CFB standard (1998). The sampler did not satisfy the CEN criteria when results from all the collieries were analysed and therefore a general calibration function suitable for all mines could not be used. In the severe conditions of the coal mines, 62% of the passive samplers failed because the electrets lost more than 70% of their initial surface charge. Work is recommended on improving the charge stability of the electrets. 7 refs., 6 figs., 1 app.

  1. Fatal accidents analysis in Peruvian mining industry

    International Nuclear Information System (INIS)

    Candia, R. C.; Hennies, W. T.; Azevedo, R. c.; Almeida, I.G.; Soto, J. F.

    2010-01-01

    Although reductions in the tax of injuries and accidents have been observed in recent years, Mining is still one of the highest risks industries. The basic causes for occurrence of fatalities can be attributed to unsafe conditions and unsafe acts. In this scene is necessary to identify safety problems and to aim the effective solutions. On the other hand, the developing countries dependence on primary industries as mining is evident. In the Peruvian economy, approximately 16% of the GNP and more than 50% of the exportations are due to the mining sector, detaching its competitive position in the worldwide mining. This paper presents fatal accidents analysis in the Peruvian mining industry, having as basis the register of occurred fatal accidents since year 2000 until 2007, identifying the main types of accidents occurred. The source of primary information is the General Mining Direction (DGM) of the Peruvian Mining and Energy Ministry (MEM). The majority of victims belongs to tertiary contractor companies that render services for mine companies. The results of the analysis show also that the majority of accidents happened in the underground mines, and that it is necessary to propose effective solutions to manage risks, aiming at reducing the fatal accidents taxes. (Author)

  2. Underground mining robot: a CSIR project

    CSIR Research Space (South Africa)

    Green, JJ

    2012-11-01

    Full Text Available The Council for Scientific and Industrial Research (CSIR) in South Africa is currently developing a robot for the inspection of the ceiling (hanging-wall) in an underground gold mine. The robot autonomously navigates the 30 meter long by 3 meter...

  3. Stability of interbed for salt cavern gas storage in solution mining considering cusp displacement catastrophe theory

    Directory of Open Access Journals (Sweden)

    Le Yu

    2015-03-01

    Full Text Available Cusp displacement catastrophe theory can be introduced to propose a new method about instability failure of the interbed for gas storage cavern in bedded salt in solution mining. We can calculate initial fracture drawing pace of this interbed to obtain 2D and 3D gas storage shapes at this time. Moreover, Stability evaluation of strength reduction finite element method (FEM based on this catastrophe theory can used to evaluate this interbed stability after initial fracture. A specific example is simulated to obtain the influence of the interbed depth, cavern internal pressure, and cavern building time on stability safety factor (SSF. The results indicate: the value of SSF will be lower with the increase of cavern building time in solution mining and the increase of interbed depth and also this value remains a rise with the increase of cavern internal pressure Especially, we can conclude that the second-fracture of the interbed may take place when this pressure is lower than 6 MPa or after 6 days later of the interbed after initial fracture. According to above analysis, some effective measures, namely elevating the tube up to the top of the interbed, or changing the circulation of in-and-out lines, can be introduced to avoid the negative effects when the second-fracture of the interbed may occur.

  4. Treatment of liquid effluent from uranium mines and mills. Report of a co-ordinated research project 1996-2000

    International Nuclear Information System (INIS)

    2004-10-01

    Treatment and control of liquid effluents produced during uranium mining and milling operations is an integral part of environmental project management. Research has continued to add to the large body of science that has been built up around the treatment of radioactive and non-radioactive effluents to minimize their long-term environmental impact. The objective of the meetings on which this publication is based was to exchange information on active effluent treatment technologies that have application during operations and passive treatment techniques such as constructed wetlands and use of micro-organisms that are applicable during project reclamation and long-term care and maintenance. Papers describe effluent treatment case histories from active uranium mining and processing operations as well as effluent treatment research on both active and passive systems that have potential application under a wide range of operating and post-operational conditions including new information on high-density sludge from effluent neutralization (Australia), aerated manganese hydroxide for removal of radium (China), nanofiltration and macropore resins to treat mine water (Australia and China), in situ microbial treatment and permeable reactive walls for treatment of contaminated groundwater (Germany), construction of wetlands to treat mine water runoff (Australia and Germany), biogenic granules to remove 226 Ra from mill effluent (India), self-remediation of acidic in situ leach aquifers (Kazakhstan) and sorption characteristics of soil for self-remediation of contaminated groundwater (Hungary). These and other topics presented in this publication will be of interest to technical personnel who deal with day-to-day practical aspects of liquid effluent control and treatment at uranium production facilities worldwide

  5. Brazil-Bolivia natural gas project challenges and solutions

    International Nuclear Information System (INIS)

    Costa, A.S.C.

    1993-01-01

    PETROBRAS, the Brazilian/International Integrated Oil and Gas Company, is leading US$ 4 billion natural gas project. The goal of this paper is to identify Project challenges and propose solutions. It starts with fundamentals. Natural gas' share in Brazilian primary energy demand is only 2%. Economic aspects and environmental concerns, however, are changing this picture. For the Bolivian economy to be linked to a relatively huge market, in the long-term, is certainly a suitable decision. Besides, this Project will promote regional integration, within and outside Marcosur economies. Reserves, market data and economics give support to a feasible Project Financial structure is the main challenge. INTERGAS, a new subsidiary of PETROBRAS is opened for 49% stock to private sector participation. As an integrated Project, many opportunities will be generated during construction and operation. E ampersand P, pipeline and downstream investments could bring different investors to different sectors

  6. WEB STRUCTURE MINING

    Directory of Open Access Journals (Sweden)

    CLAUDIA ELENA DINUCĂ

    2011-01-01

    Full Text Available The World Wide Web became one of the most valuable resources for information retrievals and knowledge discoveries due to the permanent increasing of the amount of data available online. Taking into consideration the web dimension, the users get easily lost in the web’s rich hyper structure. Application of data mining methods is the right solution for knowledge discovery on the Web. The knowledge extracted from the Web can be used to raise the performances for Web information retrievals, question answering and Web based data warehousing. In this paper, I provide an introduction of Web mining categories and I focus on one of these categories: the Web structure mining. Web structure mining, one of three categories of web mining for data, is a tool used to identify the relationship between Web pages linked by information or direct link connection. It offers information about how different pages are linked together to form this huge web. Web Structure Mining finds hidden basic structures and uses hyperlinks for more web applications such as web search.

  7. 3D RECONSTRUCTION AND MODELING OF SUBTERRANEAN LANDSCAPES IN COLLABORATIVE MINING ARCHEOLOGY PROJECTS: TECHNIQUES, APPLICATIONS AND EXPERIENCES

    Directory of Open Access Journals (Sweden)

    A. Arles

    2013-07-01

    Full Text Available Mining and underground archaeology are two domains of expertise where three-dimensional data take an important part in the associated researches. Up to now, archaeologists study mines and underground networks from line-plot surveys, cross-section of galleries, and from tool marks surveys. All this kind of information can be clearly recorded back from the field from threedimensional models with a more cautious and extensive approach. Besides, the volumes of the underground structures that are very important data to explain the mining activities are difficult to evaluate from "traditional" hand-made recordings. They can now be calculated more accurately from a 3D model. Finally, reconstructed scenes are a powerful tool as thinking aid to look back again to a structure in the office or in future times. And the recorded models, rendered photo-realistically, can also be used for cultural heritage documentation presenting inaccessible and sometimes dangerous places to the public. Nowadays, thanks to modern computer technologies and highly developed software tools paired with sophisticated digital camera equipment, complex photogrammetric processes are available for moderate costs for research teams. Recognizing these advantages the authors develop and utilize image-based workflows in order to document ancient mining monuments and underground sites as a basis for further historical and archaeological researches, performed in collaborative partnership during recent projects on medieval silver mines and preventive excavations of undergrounds in France.

  8. A research for environmental problems in the vicinity of mining area. Investigation into the impact of metallic mining on the environment and solutions

    Energy Technology Data Exchange (ETDEWEB)

    Min, Jeong Sik; Cheong, Young Wook; Lee, Hyun Joo; Song, Duk Young [Korea Inst. of Geology Mining and Materials, Taejon (Korea, Republic of)

    1995-12-01

    This study is focused on the impacts of metalliferous mines on the environment in the vicinity of the abandoned and active mines and establishment of abatements of mining environmental problems. Total number of metalliferous mines surveyed were 40 in which samples of waters, mine wastes and soil were taken. Water parameters such as the pH, Eh, TDS, conductivity, turbidity, dissolved oxygen and temperature were measured in the field. Elements such as As, Cd, Pb, Zn, Cu, Al, Mn, sulfate and cyanide were analyzed. Significant concentrations of heavy metals, mainly Cd, Zn, Cu, Fe, Mn and Al, were found in mine waters from adit and in leachates extracted from mine wastes. The mine waters flowing out from the Dalsung and Ilgwang mines were the typical acid mine drainage(AMD) contaminated by the heavy metals. Passive biological systems(Anoxic wetland) to treat AMD for metals were designed and monitored for effluents from the reactors with 4 types of composts, cow manure and limestones, Results showed that the mushroom compost with cow manure and limestone was the best substrates in metal removing efficiencies. Results from leaching of mine wastes showed that As, Cd and Cu were extracted from some of mine wastes. AMD from the mine waste dump of the Daduk mine was found. These mean that mine wastes can contaminate the soil, surface water and ground waters in vicinity of mines. Therefore cover systems or liner system for containments of mine wastes were suggested to preserve the environment. Cu and As concentrations in soils surveyed were below the heavy metal concentrations in soils of Korean standard preventing plant of the crops. However, most of the acid mine waters are drained untreated, and mine wastes with heavy metals are distributed near soil environment. Therefore efforts to reduce possibilities of soil contamination in the vicinity of mining areas is required. (author). 33 refs.

  9. FY 1998 annual report on the survey on overseas geological structures. Project for exchanging engineers (coal mining technology area) (Vietnam); 1998 nendo kaigai chishitsu kozo nado chosaa. Gijutsusha koryu jigyo (tanko gijutsu bun'ya) (Vietnam)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The project for exchanging engineers has been implemented, in order to improve production and managemental techniques of coal mining engineers in the Asia-Pacific region, promote smooth and efficient projects for surveying overseas geological structures, and facilitate stable supply of overseas coal to Japan. The FY 1998 project was concentrated on Vietnam, to which Japanese coal mining engineers were sent, and from which production management engineers were invited to Japan as trainees. The Japanese engineers sent to Vietnam educated the underground coal mining techniques. The Vietnamese management engineers invited were trained for, e.g., production management techniques (e.g., those for workplaces and organizations) in the Japanese mines, administrative management techniques, and techniques to improve safety and productivity in the mines. Coal Energy Center and Taiheiyo Mining's Kushiro Mine provided training facilities. (NEDO)

  10. Environmental impact statement - an effective tool for successful mine design

    International Nuclear Information System (INIS)

    Sinha, A.K.

    1996-01-01

    Mining is a hazardous operation which must be designed to succeed under very unpredictable environmental, geological and marketing conditions over a committed life of thirty years or longer. It is well-established by now that mining has tremendous social, economic and environmental impacts on society in general and on local communities in particular. Mining's image has begun to improve with effective hazard controls and property reclamation through improved mine design and restoration plans. Much of the credit for this achievement should go to Environmental Impact Statement and related permitting requirements for mining projects. An Environmental Impact Statement with respect to almost every type of mining project is now frequently required by major banks, and other funding agencies, governmental agencies and/or citizen groups involved in the permitting process. This impact statement ensures that the proposed project has the potential to succeed under all foreseeable environmental, geological and marketing problems throughout its projected life and to guarantee the return of the initial capital with interest. In short, the impact statement offers assurance that the final project will culminate with positive environmental and social impacts. The relevance and contributions of Environmental Impact Statements in mine design, as well as their applications and development procedures are presented. 3 refs., 8 figs

  11. REMEDIATION TECHNOLOGY EVALUATION AT THE GILT EDGE MINE, SOUTH DAKOTA

    Science.gov (United States)

    This document reports the findings of the Mine Waste Technology Program's Activity III, Project 29,The Remediation Technology Evaluation Project at the Gilt Edge Mine, S.D. This project consisted of evaluating three emerging acidic waste rock stabilization technologies and compar...

  12. Safety and health in the Canadian mine environment

    International Nuclear Information System (INIS)

    Grenier, M.G.; Hardcastle, S.G.

    1990-01-01

    CANMET's Mining Research Laboratories (MRL) in Elliot Lake and Bell's Corners, Ontario, with the cooperation of the mining industry, have contributed to improving environmental conditions in underground and surface mining and milling operations. The extent of collaboration and efforts vary widely from long-term, multi-million dollar projects between several interested parties to smaller projects involving one laboratory and a single mining operation. This paper gives examples of such collaborative efforts and potential future directions as they apply to mine ventilation analysis using tracer gas techniques, optimization of mine ventilation network efficiency using real-time monitoring and controlled recirculation (heat saving), respirable dust and radiation sampling and control techniques, diesel emission control using regenerative ceramic filters and, the control of sulphide dust explosions and resulting sulphur dioxide production. (27 refs., 6 tabs., 3 figs.)

  13. Cyrogenic Life Support Technology Development Project

    Science.gov (United States)

    Bush, David R.

    2015-01-01

    KSC has used cryogenic life support (liquid air based) technology successfully for many years to support spaceflight operations. This technology has many benefits unique to cryogenics when compared to traditional compressed gas systems: passive cooling, lighter, longer duration, and lower operating pressure. However, there are also several limiting factors that have prevented the technology from being commercialized. The National Institute of Occupational Safety and Health, Office of Mine Safety and Health Research (NIOSH-OMSHR) has partnered with NASA to develop a complete liquid air based life support solution for emergency mine escape and rescue. The project will develop and demonstrate various prototype devices and incorporate new technological innovations that have to date prevented commercialization.

  14. Data Mining Aplications in Livestock

    Directory of Open Access Journals (Sweden)

    Feyza ALEV ÇETİN

    2016-03-01

    Full Text Available Data mining provides discovering the required and applicable knowledge from very large amounts of information collected in one centre. Data mining has been used in the information industry and society. Although many methods of data mining has been used, these techniques has been remarkable in animal husbandry in recent years. For the solution of complex problems in animal husbandry many methods were discussed and developed. Brief information on data mining techniques such as k-means approach, k-nearest neighbor approach, multivariate adaptive regression function (MARS, naive Bayesian classifiers (NBC, artificial neural networks (ANN, support vector machines (SVM, decision trees are given in the study. Some data mining methods are presented and examples of the application of data mining in the field of animal husbandry in the world are provided with this study.

  15. Two-step web-mining approach to study geology/geophysics-related open-source software projects

    Science.gov (United States)

    Behrends, Knut; Conze, Ronald

    2013-04-01

    Geology/geophysics is a highly interdisciplinary science, overlapping with, for instance, physics, biology and chemistry. In today's software-intensive work environments, geoscientists often encounter new open-source software from scientific fields that are only remotely related to the own field of expertise. We show how web-mining techniques can help to carry out systematic discovery and evaluation of such software. In a first step, we downloaded ~500 abstracts (each consisting of ~1 kb UTF-8 text) from agu-fm12.abstractcentral.com. This web site hosts the abstracts of all publications presented at AGU Fall Meeting 2012, the world's largest annual geology/geophysics conference. All abstracts belonged to the category "Earth and Space Science Informatics", an interdisciplinary label cross-cutting many disciplines such as "deep biosphere", "atmospheric research", and "mineral physics". Each publication was represented by a highly structured record with ~20 short data attributes, the largest authorship-record being the unstructured "abstract" field. We processed texts of the abstracts with the statistics software "R" to calculate a corpus and a term-document matrix. Using R package "tm", we applied text-mining techniques to filter data and develop hypotheses about software-development activities happening in various geology/geophysics fields. Analyzing the term-document matrix with basic techniques (e.g., word frequencies, co-occurences, weighting) as well as more complex methods (clustering, classification) several key pieces of information were extracted. For example, text-mining can be used to identify scientists who are also developers of open-source scientific software, and the names of their programming projects and codes can also be identified. In a second step, based on the intermediate results found by processing the conference-abstracts, any new hypotheses can be tested in another webmining subproject: by merging the dataset with open data from github

  16. Conceptual development of a method to determine the principal stresses around coal mine workings to ensure safe mine design

    CSIR Research Space (South Africa)

    Coetzer, S

    1997-06-01

    Full Text Available The objective of this project is to identify or to develop methods or procedures for the determination of the principal stresses in coal mine workings, which in turn would provide improved criteria for mine design layouts in coal mines. To address...

  17. Uranium mining

    International Nuclear Information System (INIS)

    2008-01-01

    Full text: The economic and environmental sustainability of uranium mining has been analysed by Monash University researcher Dr Gavin Mudd in a paper that challenges the perception that uranium mining is an 'infinite quality source' that provides solutions to the world's demand for energy. Dr Mudd says information on the uranium industry touted by politicians and mining companies is not necessarily inaccurate, but it does not tell the whole story, being often just an average snapshot of the costs of uranium mining today without reflecting the escalating costs associated with the process in years to come. 'From a sustainability perspective, it is critical to evaluate accurately the true lifecycle costs of all forms of electricity production, especially with respect to greenhouse emissions, ' he says. 'For nuclear power, a significant proportion of greenhouse emissions are derived from the fuel supply, including uranium mining, milling, enrichment and fuel manufacture.' Dr Mudd found that financial and environmental costs escalate dramatically as the uranium ore is used. The deeper the mining process required to extract the ore, the higher the cost for mining companies, the greater the impact on the environment and the more resources needed to obtain the product. I t is clear that there is a strong sensitivity of energy and water consumption and greenhouse emissions to ore grade, and that ore grades are likely to continue to decline gradually in the medium to long term. These issues are critical to the current debate over nuclear power and greenhouse emissions, especially with respect to ascribing sustainability to such activities as uranium mining and milling. For example, mining at Roxby Downs is responsible for the emission of over one million tonnes of greenhouse gases per year and this could increase to four million tonnes if the mine is expanded.'

  18. Reprint of: Production scheduling of a lignite mine under quality and reserves uncertainty

    International Nuclear Information System (INIS)

    Galetakis, Michael; Roumpos, Christos; Alevizos, George; Vamvuka, Despina

    2012-01-01

    The effect of uncertainty sources to the stochastic optimization of the combined project of a new surface lignite mine exploitation and power plant operation for electricity generation is investigated. Major sources of uncertainty that were considered are the reserves and the quality of the lignite. Since probability distribution functions for these uncertainties were estimated during the detailed exploration phase of the deposit, the overall goal is then to determine the optimal capacity of the power plant and consequently the optimal production rate of the mine over the time. The optimization objective that was selected is the maximization of the net present value of the project. Emphasis is placed on the sensitivity analysis for the investigation of the effect of quality and reserves uncertainty on project optimization, on the mathematical formulation of risk attitude strategy and on increasing the efficiency of the optimization process by creating a limited set of feasible solutions applying empirical rules. The developed methodology was applied for the determination of the optimal annual production rate of a new surface lignite mine in the area of Ptolemais–Amynteon in Northern Greece. - Highlights: ► Quality and reserves uncertainty affects considerably the production scheduling. ► Stochastic optimization is greatly accelerated by incorporating Taylor's rule. ► Decisions can be made considering different risk level attitudes.

  19. Harnessing opportunities for good governance of health impacts of mining projects in Mongolia: results of a global partnership.

    Science.gov (United States)

    Pfeiffer, Michaela; Vanya, Delgermaa; Davison, Colleen; Lkhagvasuren, Oyunaa; Johnston, Lesley; Janes, Craig R

    2017-06-27

    The Sustainable Development Goals call for the effective governance of shared natural resources in ways that support inclusive growth, safeguard the integrity of the natural and physical environment, and promote health and well-being for all. For large-scale resource extraction projects -- e.g. in the mining sector -- environmental regulations and in particular environmental impact assessments (EIA) provide an important but insufficiently developed avenue to ensure that wider sustainable development issues, such as health, have been considered prior to the permitting of projects. In recognition of the opportunity provided in EIA to influence the extent to which health issues would be addressed in the design and delivery of mining projects, an international and intersectoral partnership, with the support of WHO and public funds from Canadian sources, engaged over a period of six years in a series of capacity development activities and knowledge translation/dissemination events aimed at influencing policy change in the extractives sector so as to include consideration of human health impacts. Early efforts significantly increased awareness of the need to include health considerations in EIAs. Coupling effective knowledge translation about health in EIA with the development of networks that fostered good intersectoral partnerships, this awareness supported the development and implementation of key pieces of legislation. These results show that intersectoral collaboration is essential, and must be supported by an effective conceptual understanding about which methods and models of impact assessment, particularly for health, lend themselves to integration within EIA. The results of our partnership demonstrate that when specific conditions are met, integrating health into the EIA system represents a promising avenue to ensure that mining activities contribute to wider sustainable development goals and objectives.

  20. Data mining in agriculture

    CERN Document Server

    Mucherino, Antonio; Pardalos, Panos M

    2009-01-01

    Data Mining in Agriculture represents a comprehensive effort to provide graduate students and researchers with an analytical text on data mining techniques applied to agriculture and environmental related fields. This book presents both theoretical and practical insights with a focus on presenting the context of each data mining technique rather intuitively with ample concrete examples represented graphically and with algorithms written in MATLAB®. Examples and exercises with solutions are provided at the end of each chapter to facilitate the comprehension of the material. For each data mining technique described in the book variants and improvements of the basic algorithm are also given. Also by P.J. Papajorgji and P.M. Pardalos: Advances in Modeling Agricultural Systems, 'Springer Optimization and its Applications' vol. 25, ©2009.

  1. An outline of the application of an environmental management system to the PRAMU (Uranium Mining Environmental Restitution Project)

    International Nuclear Information System (INIS)

    Smetniansky de De Grande, Nelida; Avila Cadena, Guadalberto; Cardozo, Damian

    2000-01-01

    In Argentina the National Atomic Energy Commission (CNEA) has the responsibility to restore uranium mining facilities, when milling operations have been shut down. To carry out this clean up actions CNEA created the Project for Uranium Mining Environmental Restoration (PRAMU in Spanish). To take into account the environmental aspects of the restoration activities, the PRAMU includes in its management an Environmental Management System (SGA in Spanish), which is of central importance in determining the environmental policy, objectives and targets. In this work a general view of the Environmental Management System is presented and an example of one of the environmental programs to be implemented is detailed. (author)

  2. Tracking Health and Well-Being in Goa's Mining Belt

    International Development Research Centre (IDRC) Digital Library (Canada)

    Nancy Minogue

    The search for balance. “Closing the mines because of their environmental impact is not an option ... As a result, local communities, governments, and mining companies are ... in mining communities would be critical to arriving at work- able solutions. ... “quality of life” instrument to assess the well-being of people in mining ...

  3. Evaluation of salt and mine rock disposal. Project No. 76-283

    International Nuclear Information System (INIS)

    1976-11-01

    Studies are being performed on the isolation of nuclear waste in geological formations; this would entail constructing an underground mine in selected rock strata for waste storage. Rocks removed from the mine during construction must be either disposed of permanently or temporarily stored for later backfill into the mine. Several methods of storing or disposing of the mined rock are discussed in this report. The technical feasibility, cost, advantages and disadvantages of each method are presented and the ranking of methods based on currently available data is discussed. Salt, shale, granite, and limestone are covered

  4. Legacies of the uranium ore mining industry and their restoration. A survey of Africa, Asia and Australia

    International Nuclear Information System (INIS)

    Waggitt, P.

    2008-01-01

    Management of the environment in the uranium mining industry has an eventful history of more than 50 years. In addition to examples of successful restoration of mining and preparation sites in some countries there are also numerous cases, in which no or defective restoration left behind serious waste deposits. In the course of the renaissance of the uranium industry there is increasing interest in the rehabilitation of such waste sites. There is still an urgent requirement to eradicate the environmental effects of the old mining industry. Previous deposits could be of interest for renewed working under the present economic boundary conditions. Restoration as an integral part of the current and future uranium mining industry with the application of modern international safety standards is extremely important. The contribution provides a survey of restoration projects of the old mining industry in various parts of the world and shows how the International Atomic Energy Agency, the national supervisory and approval authorities as well as the mining companies collaborate closely at many sites on solution of the difficult problems. (orig.)

  5. Midwest Joint Venture high-grade uranium mining

    International Nuclear Information System (INIS)

    Fredrickson, H.K.

    1992-01-01

    Midwest Joint Venture (MJV) owns a high-grade uranium deposit in northern Saskatchewan. The deposit is located too deep below surface to be mined economically by open pit methods, and as a consequence, present plans are that it will be mined by underground methods. High-grade uranium ore of the type at MJV, encased in weak, highly altered ground and with radon-rich water inflows, has not before been mined by underground methods. The test mining phase of the project, completed in 1989, had three objectives: To evaluate radiation protection requirements associated with the handling of large quantities of radon-rich water and mining high-grade uranium ore in an underground environment; to investigate the quantity and quality of water inflows into the mine; and, to investigate ground conditions in and around the ore zone as an aid in determining the production mining method to be used. With information gained from the test mining project, a mining method for the production mine has been devised. Level plans have been drawn up, ventilation system designed, pumping arrangements made and methods of ore handling considered. All this is to be done in a manner that will be safe for those doing the work underground. Some of the mining methods planned are felt to be unique in that they are designed to cope with mining problems not known to have been encountered before. New problems underground have required new methods to handle them. Remote drilling, blasting, mucking and backfilling form the basis of the planned mining method

  6. The HAW project. Test storage of high-level radiation sources in the Asse salt mine. Documentation and assessment of the storage system

    International Nuclear Information System (INIS)

    Mueller, K.; Rothfuchs, T.

    1994-01-01

    The HAW project aimed primarily at studying the interaction between high-level radioactive waste moulds and rock salt as the respository medium. Another priority was the prototype development and testing of a technical system for the emplacement of high-level radioactive moulds in deep storage boreholes. To simulate real high-level radioactive wastes, special high-level radiation sources (Cs-137, Sr-90) were produced in the United States of America under a German-American cooperation contract, for carrying out the tests at the Asse salt mine. The components of the storage system are described, their position and task within the entire handling procedure explained. Questions of radiation protection and accident protection, of functioning and operating reliability, of quality assurance and examination of documents, materials, of manufacture and functioning, and of documentation are dealt with in detail. With a view to the planning of storage techniques for a mine respository, the experience of development and operation is recorded, and recommendation of further developments are given. Problems which arose during work on the HAW project were partly due to test-specific reasons and will not or not in this form occur in a mine respository. It was planned to start the test emplacement in 1987, and it could have been executed in 1993 after appropriate preparation and approval of the storage system by the mining authority and the Hanover TUEV in 1991. In December 1992, however, the Federal Government decided to give up to the project due to the uncertain licensing situation, and to immediately stop all preparatory work. (orig./HP) [de

  7. Application of bacterial leaching technology to deep solution-mining conditions for uranium extraction. Final report, September 1, 1978-September 30, 1981

    International Nuclear Information System (INIS)

    Brierley, J.A.; Brierley, C.L.; Torma, A.E.

    1982-03-01

    Microorganisms were evaluated for use in recovery of uranium under conditions of in-situ solution mining. The cultures tested were Thiobacillus ferrooxidans, the faculative-thermophilic TH3 strain, and two Sulfolobus species. Growth of the organisms occurred in the presence of 0.34 to 5.0 mM uranyl ion with higher concentrations being inhibitory. Uranium ore from the Anaconda Minerals Co. Jackpile mine was not readily leachable by microorganisms. To support bacterial activity the ore was supplemented with pyrite or ferrous iron. The ore possessed some toxic properties. T. ferrooxidans was able to assist in leaching of uranium from the ore at a hydrostatic pressure of 10.3 MPa

  8. Ghana - Mining and Development

    OpenAIRE

    Mohan, P.C.

    2004-01-01

    The objectives of the project ($9.37 million, 1996-2001) were to (a) enhance the capacity of the mining sector institutions to carry out their functions of encouraging and regulating investments in the mining sector in an environmentally sound manner and (b) support the use of techniques and mechanisms that will improve productivity, financial viability and reduce the environmental impact of ...

  9. Sustainable mining, local communities and environmental regulation

    Directory of Open Access Journals (Sweden)

    Kokko Kai

    2015-12-01

    Full Text Available Sustainable mining is an objective as well as a tool for balancing economic, social, and environmental considerations. Each of these three dimensions of mining – and sustainable development – has many components, some of which were chosen for closer study in the SUMILCERE project. While there is no single component that in itself provides a definitive argument for or against sustainable mining, the research reveals some that have proven valuable in the process of balancing the different dimensions of sustainability. In the SUMILCERE project, comparative studies enabled us to identify factors such as the following, which are essential when discussing the balancing in practice of the three dimensions of sustainable mining cited above: the framework and functionality of environmental regulation to protect the environment (environmental sustainability; competitiveness of the mining industry in light of environmental regulation and its enforcement (economic sustainability; public participation and the opportunities local communities have to influence their surroundings, as well as communities’ acceptance of projects (social sustainability before and during operations; and the protection of Sámi cultural rights in mining projects (social and cultural sustainability. Although each of the three dimensions of sustainability leaves room for discretion in the weight assigned to it, ecological sustainability, protected by smart environmental regulation and minimum standards, sets essential boundaries that leave no room for compromises. Economic and social sustainability are possible only within these limits. Details of the analyses in the Kolarctic area and accounts of the methods used can befound in the cited SUMILCERE articles.

  10. Research and Development of a New Silica-Alumina Based Cementitious Material Largely Using Coal Refuse for Mine Backfill, Mine Sealing and Waste Disposal Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    Henghu Sun; Yuan Yao

    2012-06-29

    Coal refuse and coal combustion byproducts as industrial solid waste stockpiles have become great threats to the environment. To activate coal refuse is one practical solution to recycle this huge amount of solid waste as substitute for Ordinary Portland Cement (OPC). The central goal of this project is to investigate and develop a new silica-alumina based cementitious material largely using coal refuse as a constituent that will be ideal for durable construction, mine backfill, mine sealing and waste disposal stabilization applications. This new material is an environment-friendly alternative to Ordinary Portland Cement. The main constituents of the new material are coal refuse and other coal wastes including coal sludge and coal combustion products (CCPs). Compared with conventional cement production, successful development of this new technology could potentially save energy and reduce greenhouse gas emissions, recycle vast amount of coal wastes, and significantly reduce production cost. A systematic research has been conducted to seek for an optimal solution for enhancing pozzolanic reactivity of the relatively inert solid waste-coal refuse in order to improve the utilization efficiency and economic benefit as a construction and building material.

  11. Mechanization of operations in underground workings in coal mines and research project trends. [Poland

    Energy Technology Data Exchange (ETDEWEB)

    Reich, K; Skoczynski, W; Sikora, W

    1985-01-01

    Structure of black coal reserves of Poland, imported and Polish made equipment for underground mining, prospects for mechanization of selected operations in underground mines and research programs of the KOMAG Center for Mechanization of Mining are evaluated. Prospects for longwall mining with caving or stowing in thick coal seams (slice mining), thin (0.8 to 1.2 m), level or inclined coal seams and steep seams are analyzed. The following equipment for mechanization of underground mining is evaluated: integrated face systems, shearer loaders, chain conveyors, belt conveyors, coal plows, equipment for mine drivage, hoists, drive systems for mining equipment. The following research programs of the KOMAG Center are reviewed: modernization of face systems for coal seams with uncomplicated mining conditions, development of equipment for thin seam mining, development of types of mining equipment for coal seams from 1.5 to 3.0 m thick with dip angles to 25 degrees, modernization of equipment for thick seam mining, increasing efficiency of mine drivage (new types of heading machines, materials handling equipment for mine drivage), mechanization of auxiliary operations in underground coal mines, improving quality of mining equipment, development of equipment for coal preparation, increasing occupational safety in underground mining.

  12. Fiscal 1998 engineer interexchange project (coal mine technology field). Preliminary survey on the international interexchange project in America; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Beikoku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    As a part of the fiscal 1998 international interexchange project in a coal mine technology field, the survey was made in America. Geological engineering problem has large effect on the protection and productivity of underground coal mines. Promotion of long wall mining has contributed to reduction of disasters, however, recently deaths due to roof collapse and wall collapse are on the increase. A roof evaluation technique was developed for adequate selection of mining methods and support design, and its standardization and diffusion are in promotion. Integration and improvement advanced in facility technology because of worldwide integration by acquisition of coal mine facility manufacturers. Introduction of high-power high-capacity facilities is increasing with introduction of large long wall working faces, and development of rear transport system technology and labor saving by remote control are also in promotion according to such trend. As automation and labor saving technology of mining facilities, the automated direction detection and control system by laser and gyroscope is under development. (NEDO)

  13. Integration of OHS into Risk Management in an Open-Pit Mining Project in Quebec (Canada

    Directory of Open Access Journals (Sweden)

    Adel Badri

    2011-09-01

    Full Text Available Despite undeniable progress, the mining industry remains the scene of serious accidents revealing disregard for occupational health and safety (OHS and leaving open the debate regarding the safety of its employees. The San José mine last collapse near Copiapó, Chile on 5 August 2010 and the 69-day rescue operation that followed in order to save 33 miners trapped underground show the serious consequences of neglecting worker health and safety. The aim of this study was to validate a new approach to integrating OHS into risk management in the context of a new open-pit mining project in Quebec, based on analysis of incident and accident reports, semi-structured interviews, questionnaires and collaborative field observations. We propose a new concept, called hazard concentration, based on the number of hazards and their influence. This concept represents the weighted fraction of each category of hazards related to an undesirable event. The weight of each category of hazards is calculated by AHP, a multicriteria method. The proposed approach included the creation of an OHS database for facilitating expert risk management. Reinforcing effects between hazard categories were identified and all potential risks were prioritized. The results provided the company with a rational basis for choosing a suitable accident prevention strategy for its operational activities.

  14. Hydrogeologic and Hydraulic Conditions of Old Mine Workings of the Former Jeroným Mine

    Czech Academy of Sciences Publication Activity Database

    Grmela, A.; Žůrek, P.; Kukutsch, Radovan; Kořínek, R.

    2011-01-01

    Roč. 57, č. 4 (2011), s. 17-25 ISSN 1802-5420 R&D Projects: GA ČR GA105/09/0089 Institutional research plan: CEZ:AV0Z30860518 Keywords : Jeroným Mine * old mine workings * hydrogeology Subject RIV: DB - Geology ; Mineralogy http://gse.vsb.cz/

  15. Collapse settlement of wetted mine waste - two case histories

    International Nuclear Information System (INIS)

    Peterson, T.W.; Wade, N.H.

    1997-01-01

    Two separate projects, constructed on reclaimed coal mine waste at TransAlta's Highvale Mine complex in west-central Alberta, experienced significant settlements as a result of groundwater recharge. One project, a new service building for large coal haulers and other heavy mining equipment, was constructed in 1981 on a thick, compacted fly ash raft overlying 15 m of dynamically compacted mine waste. Little if any building settlement was observed for the first few years after construction at which time progressive differential settlements were experienced that were related to unanticipated groundwater recharge. The second project, the diversion of an environmentally sensitive creek away from the active mining area, involved the construction of a 1.5 km canal and a 5 m high stepped drop structure over dragline-dumped waste up to 20 m thick. Pre-compression of the mine waste beneath the drop structure was effected by water injection through a series of wells installed in the structure footprint prior to construction. This paper outlines the methods of construction, investigations conducted, confirmatory field test procedures and settlements measured at both projects and, based on the findings, provides guidelines for possible mitigative measures in reducing saturation-induced settlements in future developments on reclaimed land. 6 refs., 10 figs

  16. The Necessity of Public Relations for Sustainable Mining Activities

    Science.gov (United States)

    Lee, Hyunbock; Ji, Sangwoo

    2015-04-01

    This paper reports research about the necessity of image making for sustainable mine developments in the Republic of Korea. One of the big risks in mining activities is mining area residents opposing mine developments and operations. Analysis of the media reports on disputes between mining companies and residents can determine causes of opposing mine developments, dispute process, and influences of disputes on processes of mining projects. To do this, civil complaints from 2009 to 2012 and 24 media reports since 2000 on opposing mining activities are analyzed. And, to analyze difficulties of mining companies, the survey is conducted to target to mining companies. 57 representatives of mining companies are participated in the survey. The result of analysis cited that the major reasons of anti-mining activities are environmental degradation and reduced agricultural productivity. And specifically because of water pollution (50%), crop damages (33%), and mining dust pollution (21%), communities of mining area are against mine developments and operations. However, 25% of residents have experience of the damage caused by mining activities and the remaining 75% of residents opposing mining activities simply have anxiety about mining pollution. In the past, construction-oriented, environment-unfriendly mining projects had lasted. And while mine reclamation had been postponed in abandoned mines, mining area residents had suffered from mining pollution. So, mining area residents are highly influenced by the prejudice that mining activities are harmful to mining area communities. Current mining projects in South Korea, unlike the past mining activity, focus on minimizing environmental damage and contributing to mining area communities financially. But, in many case of disputes between mining companies and mining area residents, the both cannot reach an agreements because of the negative prejudice. Moreover, some communities categorically refuse any mining activity. On the

  17. Coal mining and the resource community cycle: A longitudinal assessment of the social impacts of the Coppabella coal mine

    Energy Technology Data Exchange (ETDEWEB)

    Lockie, S.; Franettovich, M.; Petkova-Timmer, V.; Rolfe, J.; Ivanova, G. [CQUniversity of Australia, Rockhampton, Qld. (Australia). Inst. of Health & Social Science Research

    2009-09-15

    Two social impact assessment (SIA) studies of Central Queensland's Coppabella coal mine were undertaken in 2002-2003 and 2006-2007. As ex post studies of actual change, these provide a reference point for predictive assessments of proposed resource extraction projects at other sites, while the longitudinal element added by the second study illustrates how impacts associated with one mine may vary over time due to changing economic and social conditions. It was found that the traditional coupling of local economic vitality and community development to the life cycle of resource projects - the resource community cycle - was mediated by labour recruitment and social infrastructure policies that reduced the emphasis on localised employment and investment strategies. and by the cumulative impacts of multiple mining projects within relative proximity to each other. The resource community cycle was accelerated and local communities forced to consider ways of attracting secondary investment and/or alternative industries early in the operational life of the Coppabella mine in order to secure significant economic benefits and to guard against the erosion of social capital and the ability to cope with future downturns in the mining sector.

  18. Coal mining and the resource community cycle: A longitudinal assessment of the social impacts of the Coppabella coal mine

    International Nuclear Information System (INIS)

    Lockie, Stewart; Franettovich, Maree; Petkova-Timmer, Vanessa; Rolfe, John; Ivanova, Galina

    2009-01-01

    Two social impact assessment (SIA) studies of Central Queensland's Coppabella coal mine were undertaken in 2002-2003 and 2006-2007. As ex post studies of actual change, these provide a reference point for predictive assessments of proposed resource extraction projects at other sites, while the longitudinal element added by the second study illustrates how impacts associated with one mine may vary over time due to changing economic and social conditions. It was found that the traditional coupling of local economic vitality and community development to the life cycle of resource projects-the resource community cycle-was mediated by labour recruitment and social infrastructure policies that reduced the emphasis on localised employment and investment strategies, and by the cumulative impacts of multiple mining projects within relative proximity to each other. The resource community cycle was accelerated and local communities forced to consider ways of attracting secondary investment and/or alternative industries early in the operational life of the Coppabella mine in order to secure significant economic benefits and to guard against the erosion of social capital and the ability to cope with future downturns in the mining sector.

  19. Engineer exchanging project (coal mine technology field) in fiscal 1999. International information exchanging project (advance survey on Russia); 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Roshia)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This advance survey on Russia has performed visiting surveys and information collection at coal related organizations inside Japan and in overseas countries on production technology levels, trends and technology exchange needs in overseas coal producing countries. The project is intended to serve for improvement in the contents of and smooth execution of the engineer exchange project in the 'coal mine technology field. It was carried out by expertise people as the site surveys and the engineer reception and exchange surveys. Because of the economic crisis that has hit Russia in 1998, unprofitable coal mines were closed one after another under the coal mine scrap and build policy under the initiative of the World Bank. This situation is giving serious impacts on coal mines in the Far East Russia and the coastal areas. However, the importance of coal as the primary energy source has not been changed at all in the Far East Russia. Thus, the areas have fallen into a situation that they must rely on a great amount of introduced and imported coals as a result of weakening in coal mines in the Far Eastern area on the other hand. This paper reports mainly the situation in which the coal industries in the coastal areas are placed, and the possibilities of technology exchange. (NEDO)

  20. Granular-relational data mining how to mine relational data in the paradigm of granular computing ?

    CERN Document Server

    Hońko, Piotr

    2017-01-01

    This book provides two general granular computing approaches to mining relational data, the first of which uses abstract descriptions of relational objects to build their granular representation, while the second extends existing granular data mining solutions to a relational case. Both approaches make it possible to perform and improve popular data mining tasks such as classification, clustering, and association discovery. How can different relational data mining tasks best be unified? How can the construction process of relational patterns be simplified? How can richer knowledge from relational data be discovered? All these questions can be answered in the same way: by mining relational data in the paradigm of granular computing! This book will allow readers with previous experience in the field of relational data mining to discover the many benefits of its granular perspective. In turn, those readers familiar with the paradigm of granular computing will find valuable insights on its application to mining r...

  1. Superficial drainage studies in open-pit mines

    International Nuclear Information System (INIS)

    Teixeira Junior, P.B.; Leite, C.B.B.

    1984-01-01

    Drainage studies concerning large open-pit mining projects can be of vital importance throughout the mining activity itself as they may assist in avoiding activity interruptions due to drainage problems, therefore representing substantial savings. These studies should, in fact, be carried out from the initial activity stages and shall be considered in operational, project and planning decisions in order to optimize results and reduce costs. This specific study presents a drainage study systematization proposal, enphasazing economic decision criteria. The authors comment on studies of this nature developed at the Caldas uranium mine - NUCLEBRAS. (D.J.M.) [pt

  2. Implications of Emerging Data Mining

    Science.gov (United States)

    Kulathuramaiyer, Narayanan; Maurer, Hermann

    Data Mining describes a technology that discovers non-trivial hidden patterns in a large collection of data. Although this technology has a tremendous impact on our lives, the invaluable contributions of this invisible technology often go unnoticed. This paper discusses advances in data mining while focusing on the emerging data mining capability. Such data mining applications perform multidimensional mining on a wide variety of heterogeneous data sources, providing solutions to many unresolved problems. This paper also highlights the advantages and disadvantages arising from the ever-expanding scope of data mining. Data Mining augments human intelligence by equipping us with a wealth of knowledge and by empowering us to perform our daily tasks better. As the mining scope and capacity increases, users and organizations become more willing to compromise privacy. The huge data stores of the ‚master miners` allow them to gain deep insights into individual lifestyles and their social and behavioural patterns. Data integration and analysis capability of combining business and financial trends together with the ability to deterministically track market changes will drastically affect our lives.

  3. Modeling water flow and solute transport in unsaturated zone inside NSRAWD project

    International Nuclear Information System (INIS)

    Constantin, A.; Diaconu, D.; Bucur, C.; Genty, A.

    2015-01-01

    The NSRAWD project (2010-2013) - Numerical Simulations for Radioactive Waste Disposal was initiated under a collaboration agreement between the Institute for Nuclear Research and the French Alternative Energies and Atomic Energy Commission (CEA). The context of the project was favorable to combine the modeling activities with an experimental part in order to improve and validate the numerical models used so far to simulate water flow and solute transport at Saligny site, Romania. The numerical models developed in the project were refined and validated on new hydrological data gathered between 2010-2012 by a monitoring station existent on site which performs automatic determination of soil water content and matrix potential, as well as several climate parameters (wind, temperature and precipitations). Water flow and solute transport was modeled in transient conditions, by taking into consideration, as well as neglecting the evapotranspiration phenomenon, on the basis of a tracer test launched on site. The determination of dispersivities for solute transport was targeted from the solute plume. The paper presents the main results achieved in the NSRAWD project related to water flow and solute transport in the unsaturated area of the Saligny site. The results indicated satisfactory predictions for the simulation of water flow in the unsaturated area, in steady state and transient conditions. In the case of tracer transport modeling, dispersivity coefficients could not be finally well fitted for the data measured on site and in order to obtain a realistic preview over the values of these parameters, further investigations are recommended. The article is followed by the slides of the presentation

  4. Oil sands mine planning and waste management using goal programming

    Energy Technology Data Exchange (ETDEWEB)

    Ben-Awuah, E.; Askari-Nasab, H. [Alberta Univ., Edmonton, AB (Canada). Dept. of Civil and Environmental Engineering; Alberta Univ., Edmonton, AB (Canada). Mining Optimization Laboratory

    2010-07-01

    A goal programming method was used to plan waste management processes at an oil sands mine. This method requires the decision maker (DM) to set goals. Mine planning is used to determine a block extraction schedule that maximizes net present value (NPV). Due to land restrictions, tailings facilities are sited within the pit area and dykes are used to contain the tailings. Many of the materials used to construct the dykes come from the mining operation. The mine plan scheduled both ore and dyke material concurrently. Dykes were constructed simultaneously as the mine phase advanced. A model was used to classify an oil sands block model into different material types. A mixed integer goal programming (MIGP) method was used to generate a strategic schedule. Block clustering techniques were used to large-scale mine planning projects. The method was used to verify and validate synthetic and real case data related to the cost of mining all material as waste, and the extra cost of mining dyke material. A case study of an oil sands project was used to demonstrate the method. The study showed that the developed model generates a smooth and uniform strategic schedule for large-scale mine planning projects. tabs., figs.

  5. Oil sands mine planning and waste management using goal programming

    International Nuclear Information System (INIS)

    Ben-Awuah, E.; Askari-Nasab, H.; Alberta Univ., Edmonton, AB

    2010-01-01

    A goal programming method was used to plan waste management processes at an oil sands mine. This method requires the decision maker (DM) to set goals. Mine planning is used to determine a block extraction schedule that maximizes net present value (NPV). Due to land restrictions, tailings facilities are sited within the pit area and dykes are used to contain the tailings. Many of the materials used to construct the dykes come from the mining operation. The mine plan scheduled both ore and dyke material concurrently. Dykes were constructed simultaneously as the mine phase advanced. A model was used to classify an oil sands block model into different material types. A mixed integer goal programming (MIGP) method was used to generate a strategic schedule. Block clustering techniques were used to large-scale mine planning projects. The method was used to verify and validate synthetic and real case data related to the cost of mining all material as waste, and the extra cost of mining dyke material. A case study of an oil sands project was used to demonstrate the method. The study showed that the developed model generates a smooth and uniform strategic schedule for large-scale mine planning projects. tabs., figs.

  6. Innovative funding solution for special projects: Crowd funding

    Directory of Open Access Journals (Sweden)

    Sentot Imam Wahjono

    2015-06-01

    Full Text Available The aim of this paper is to examine the influence of crowd funding knowledge, applica-tion, platform, and project initiator toward successful crowd funding. This study conducted by quantitative approach, data have been collected with web-based ques-tionnaires via Kickstarter.com direct message and e-mail to 200 successful crowd funding project initiators as a sample and as much 152 sets questionnaire returned by a complete answer and should be analyzed further. Deployment and data collection take 3 month from October to December 2013. This study found evidence that crowd funding knowledge, crowd funding application, crowd funding platform, and project initiator has positive and significant relationship toward the success of crowd funding. The implication from this research is crowd funding can be a source of capital to finance the projects, not just rely on traditional sources of financing just like banking and capital markets. Crowd funding can be innovative funding solution.

  7. Problem Solution Project: Transforming Curriculum and Empowering Urban Students and Teachers

    Science.gov (United States)

    Jarrett, Olga S.; Stenhouse, Vera

    2011-01-01

    This article presents findings of 6 years of implementing a Problem Solution Project, an assignment influenced by service learning, problem-based learning, critical theory, and critical pedagogy whereby teachers help children tackle real problems. Projects of 135 teachers in an urban certification/master's program were summarized by cohort year…

  8. Uranium mines of Tajikistan

    International Nuclear Information System (INIS)

    Razykov, Z.A; Gusakov, E.G.; Marushenko, A.A.; Botov, A.Yu.; Yunusov, M.M.

    2002-12-01

    The book describes location laws, the main properties of geological structure and industrial perspectives for known uranium mines of the Republic of Tajikistan. Used methods of industrial processing of uranium mines are described. The results of investigations of technological properties of main types of uranium ores and methods of industrial processing of some of them are shown. Main properties of uranium are shortly described as well as problems, connected with it, which arise during exploitation, mining and processing of uranium ores. The main methods of solution of these problems are shown. The book has interest for specialists of mining, geological, chemical, and technological fields as well as for students of appropriate universities. This book will be interested for usual reader, too, if they are interested in mineral resources of their country [ru

  9. Intermediate and long-term radiological consequences of an uncontrolled access of saline solution into the Asse mine - 59163

    International Nuclear Information System (INIS)

    Ustohalova, Veronika; Kueppers, Christian

    2012-01-01

    analytical solution of one- or two-dimensional dispersion-convention transport equation. The tool 'Migration' allows to quickly estimate the possible ranges of radioactive contamination in the ground water table over time whereas several parameters can be varied. The radiological exposure in the tool 'Exposure' can be calculated according to Gernrman approach AVV [3] or BglB [4]. The calculation model was tested on specific examples and the agreement with the reality was proven. There have been several approaches published on the subject of groundwater flow or radionuclide transfer in Asse mine but no one introduced more exactly radionuclide migration with coupled migration of decay chains and combined it in addition with the computation of radionuclide transfer in the biosphere. (authors)

  10. Development of computerized stocktaking system in mine surveying for ore mineral volume calculation in covered storehouses

    Science.gov (United States)

    Valdman, V. V.; Gridnev, S. O.

    2017-10-01

    The article examines into the vital issues of measuring and calculating the raw stock volumes in covered storehouses at mining and processing plants. The authors bring out two state-of-the-art high-technology solutions: 1 - to use the ground-based laser scanning system (the method is reasonably accurate and dependable, but costly and time consuming; it also requires the stoppage of works in the storehouse); 2 - to use the fundamentally new computerized stocktaking system in mine surveying for the ore mineral volume calculation, based on the profile digital images. These images are obtained via vertical projection of the laser plane onto the surface of the stored raw materials.

  11. Acid mine drainage

    Science.gov (United States)

    Bigham, Jerry M.; Cravotta, Charles A.

    2016-01-01

    Acid mine drainage (AMD) consists of metal-laden solutions produced by the oxidative dissolution of iron sulfide minerals exposed to air, moisture, and acidophilic microbes during the mining of coal and metal deposits. The pH of AMD is usually in the range of 2–6, but mine-impacted waters at circumneutral pH (5–8) are also common. Mine drainage usually contains elevated concentrations of sulfate, iron, aluminum, and other potentially toxic metals leached from rock that hydrolyze and coprecipitate to form rust-colored encrustations or sediments. When AMD is discharged into surface waters or groundwaters, degradation of water quality, injury to aquatic life, and corrosion or encrustation of engineered structures can occur for substantial distances. Prevention and remediation strategies should consider the biogeochemical complexity of the system, the longevity of AMD pollution, the predictive power of geochemical modeling, and the full range of available field technologies for problem mitigation.

  12. Mining highly stressed areas, part 1.

    CSIR Research Space (South Africa)

    Johnson, R

    1995-12-01

    Full Text Available The aim of this long-term project has been to focus on the extreme high-stress end of the mining spectrum. Such high stress conditions will prevail in certain ultra-deep mining operation of the near future, and are already being experienced...

  13. Description of basic mining legal principles.

    Science.gov (United States)

    Schmidt, Reinhard

    2014-01-01

    The Federal Mining Act manages access, via the system of mining concessions, to areas free for mining natural resources that do not belong to the surface property and deposits' owner. These cover especially important natural resources for the economy, including coal, ore, salt, crude oil and natural gas, and also terrestrial heat. For mining operations there exist, however, the same decrees for natural resources in the property of the surface owners, which are predominantly higher-value industrial minerals such as roofing slate, basalt, quartz sand, and clays for the fireproofing industry. In the case of mining laws, administrative procedures such as issuing mining concessions, approving operating plans, and issuing permits or licenses to explore according to water rights or the Federal Immission Control Act, those authorities and departments in whose remit the projects fall are dealt with by the Mining Authority. This means that the Mining Authority is the only state point of contact for the applicant, essentially an "all-in-one" service as it will itself instigate any further participation procedures required. The classic licensing procedure of mining is the operations plan procedure, whereby the operator submits an operating plan to the Mining Authority, which then examines it to ensure it fulfills mandatory legal safety objectives. If necessary these safety objectives can be met during licensing of the operating plans by stipulating additional requirements, Depending on the subject and validity period there are overall operating plans having the widest possible remit with comprehensive participation by the authorities and basic operating plans that form the basis for every mining works. There are also special operating plans, which owing to the dynamics of mining, resolve matters that suddenly become necessary or when the basic operating plans as originally conceived were not relevant. The closing-down operating plan is the designated tool for closing down

  14. The financial assurance of obliteration of mining activity consequences

    OpenAIRE

    Jaroslav Dvořáček

    2004-01-01

    The contribution deals with the financing of the obliteration of the mining activity consequences process which is considered as the general problem of mining industry connected with the mining activity completion. It deals with the existing law solution of this sphere in the Czech Republic and the changes expected. The procedures of the resources ensuring for the mining activity consequences obliteration used in abroad are mentioned here.

  15. How an EAM solution could support a new build project?

    International Nuclear Information System (INIS)

    Luanco, E.

    2008-01-01

    In the context of the nuclear renaissance, the purpose of this paper is to address from an Enterprise Asset Management system (EAM) prospective the business needs of all the main stake holders of a new NPP? These are the Architect Engineers AE, the EPC and the future operator of a new NPP? It also covers the regulatory and asset life cycle management aspects of such a project. Besides meeting the US specific 10CFR part 52 requirements of the new combine construction and operating license (COL) process, we will review the generic ones which needs be satisfied no matter the country where this new build project is taking place. It also covers plant life cycle considerations with regards of the key information generated by the plant constructors and design providers which are of importance to the future NPP operators. All these requirements bring their own lot of issues that an appropriate EAM solution could address. Ventyx (formerly Indus International), is a nuclear EAM solutions provider for the passed 30 years and its solution used all over the world. This paper will review these requirements which could easily be supported by such a solution and review its potential key benefits it could bring to all involved parties. (authors)

  16. Limitations in small artisanal gold mining addressed by educational components paired with alternative mining methods.

    Science.gov (United States)

    Zolnikov, Tara R

    2012-03-01

    Current solutions continue to be inadequate in addressing the longstanding, worldwide problem of mercury emissions from small artisanal gold mining. Mercury, an inexpensive and easily accessible heavy metal, is used in the process of extracting gold from ore. Mercury emissions disperse, affecting human populations by causing adverse health effects and environmental and social ramifications. Many developing nations have sizable gold ore deposits, making small artisanal gold mining a major source of employment in the world. Poverty drives vulnerable, rural populations into gold mining because of social and economic instabilities. Educational programs responding to this environmental hazard have been implemented in the past, but have had low positive results due to lack of governmental support and little economic incentive. Educational and enforced intervention programs must be developed in conjunction with governmental agencies in order to successfully eliminate this ongoing problem. Industry leaders offered hopeful suggestions, but revealed limitations when trying to develop encompassing solutions to halt mercury emissions. This research highlights potential options that have been attempted in the past and suggests alternative solutions to improve upon these methods. Some methods include buyer impact recognition, risk assessment proposals exposing a cost-benefit analysis and toxicokinetic modeling, public health awareness campaigns, and the education of miners, healthcare workers, and locals within hazardous areas of mercury exposure. These methods, paired with the implementation of alternative mining techniques, propose a substantial reduction of mercury emissions. Copyright © 2011 Elsevier B.V. All rights reserved.

  17. Groundwater restoration with in situ uranium leach mining

    International Nuclear Information System (INIS)

    Charbeneau, R.J.

    1984-01-01

    In situ leach mining of uranium has developed into a major mining technology. Since 1975, when the first commercial mine was licensed in the United States, the percentage or uranium produced by in situ mining has steadily grown from 0.6 to 10 percent in 1980. Part of the reason for this growth is that in situ mining offers less initial capital investment, shorter start-up times, greater safety, and less labor than conventional mining methods. There is little disturbance of the surface terrain or surface waters, no mill tailings piles, and no large open pits, but in situ leaching mining does have environmental disadvantages. During the mining, large amounts of ground water are cirulated and there is some withdrawal from an area where aquifers constitute a major portion of the water supply for other purposes. When an ammonia-based leach system is used, the ammonium ion is introduced into an area where cation exchange on clays (and some production of nitrate) may occur. Also, injection of an oxidant with the leach solution causes valence and phase changes of indigenous elements such as As, Cu, Fe, Mo, Se, S, and V as well as U. Furthermore, the surrounding ground water can become contaminated by escape of the leach solution from the mining zone. This chapter presents an overview of the in situ mining technology, including uranium deposition, mining techniques, and ground water restoration alternatives. The latter part of the chapter covers the situation in South Texas. Economics and development of the industry, groundwater resources, regulation, and restoration activities are also reviewed

  18. Socially Responsible Mining: the Relationship between Mining and Poverty, Human Health and the Environment

    Science.gov (United States)

    Maier, Raina M.; Díaz-Barriga, Fernando; Field, James A.; Hopkins, James; Klein, Bern; Poulton, Mary M.

    2016-01-01

    Increasing global demand for metals is straining the ability of the mining industry to physically keep up with demand (physical scarcity). On the other hand, social issues including the environmental and human health consequences of mining as well as the disparity in income distribution from mining revenues are disproportionately felt at the local community level. This has created social rifts, particularly in the developing world, between affected communities and both industry and governments. Such rifts can result in a disruption of the steady supply of metals (situational scarcity). Here we discuss the importance of mining in relationship to poverty, identify steps that have been taken to create a framework for socially responsible mining, and then discuss the need for academia to work in partnership with communities, government, and industry to develop trans-disciplinary research-based step change solutions to the intertwined problems of physical and situational scarcity. PMID:24552962

  19. Deep underground exploration in the Asse salt mine

    International Nuclear Information System (INIS)

    Steinberg, S.; Schmidt, M.W.

    1992-01-01

    The activities reported here under the project task entitled ''Deep underground exploration up to the 925 m level'' opened up depths and salt formations in the Asse salt mine which are intended sites for R and D work for investigating and determining the conditions of radioactive waste disposal in a repository of the Gorleben type. The newly developed experimental levels will thus allow to directly apply research results obtained in the Asse mine to the Gorleben project. The activities reported included among other tasks work for increasing the depth of exploration in the Asse mine 2 down to 950 m, using a newly developed cutting method. The work was performed in cooperation with a mining corporation specializing in this sort of tasks. (orig.) With 18 maps [de

  20. Proceedings of the 11. annual mining industry learning seminar : 2006 equipment evolutions

    Energy Technology Data Exchange (ETDEWEB)

    Joseph, T. [Alberta Univ., Edmonton, AB (Canada). School of Mining and Petroleum Engineering] (comp.)

    2006-07-01

    This seminar provided a forum for mine engineers, geologists, operators, vendors and academics to discuss various topics on equipment evolution that address mining industry concerns. Participants included those who are involved in mine planning, equipment selection, operations and maintenance. The presentations identified possible solutions to ongoing issues and alternative technologies emerging in the mining industry. Operators and original equipment manufacturers shared their innovations in novel developments and presented solutions to issues relevant to mining processes including truck and shovel technology issues such as tires, lube and fuel emissions. The seminar featured 17 presentations, of which 5 have been catalogued separately for inclusion in this database. tabs., figs.

  1. Cultural text mining: using text mining to map the emergence of transnational reference cultures in public media repositories

    NARCIS (Netherlands)

    Pieters, Toine; Verheul, Jaap

    2014-01-01

    This paper discusses the research project Translantis, which uses innovative technologies for cultural text mining to analyze large repositories of digitized public media, such as newspapers and journals.1 The Translantis research team uses and develops the text mining tool Texcavator, which is

  2. Naesliden Project: rock mechanics observations and measurements in the Naesliden mine

    Energy Technology Data Exchange (ETDEWEB)

    Nilsson, G.; Krauland, N.

    1980-05-15

    Observations and measurements of the reaction of the rock mass to mining have been made in the Naesliden Mine since the very start of mining operations in 1970. This observation program originated in the need of better understanding of the rock mechanics of cut-and-fill mining. The program comprises the following types of measurement - in the backfilled excavation convergence of the sidewalls pressure in the fill - in the orebody and alteration zones above the stopes horizontal deformation of the orebody and of the adjoining alteration zones horizontal stresses changes in horizontal stresses - in the stope amount and direction of roof and sidewall displacements convergence and sidewall deformation successively in roof and floor - in the sidewall surface subsidence horizontal displacements at 260 m level. Purpose, extent, methods and results of measurements are described. Qualitative observations concerning fracture processes due to mining are reported. The results are discussed and used for estimation of in situ modulus of elasticity of the orebody as well as the ratio of the modulus of elasticity of the orebody to the modulus of the alteration zone.

  3. Integrating geological uncertainty in long-term open pit mine production planning by ant colony optimization

    Science.gov (United States)

    Gilani, Seyed-Omid; Sattarvand, Javad

    2016-02-01

    Meeting production targets in terms of ore quantity and quality is critical for a successful mining operation. In-situ grade uncertainty causes both deviations from production targets and general financial deficits. A new stochastic optimization algorithm based on ant colony optimization (ACO) approach is developed herein to integrate geological uncertainty described through a series of the simulated ore bodies. Two different strategies were developed based on a single predefined probability value (Prob) and multiple probability values (Pro bnt) , respectively in order to improve the initial solutions that created by deterministic ACO procedure. Application at the Sungun copper mine in the northwest of Iran demonstrate the abilities of the stochastic approach to create a single schedule and control the risk of deviating from production targets over time and also increase the project value. A comparison between two strategies and traditional approach illustrates that the multiple probability strategy is able to produce better schedules, however, the single predefined probability is more practical in projects requiring of high flexibility degree.

  4. Data Mining and Optimization Tools for Developing Engine Parameters Tools

    Science.gov (United States)

    Dhawan, Atam P.

    1998-01-01

    This project was awarded for understanding the problem and developing a plan for Data Mining tools for use in designing and implementing an Engine Condition Monitoring System. Tricia Erhardt and I studied the problem domain for developing an Engine Condition Monitoring system using the sparse and non-standardized datasets to be available through a consortium at NASA Lewis Research Center. We visited NASA three times to discuss additional issues related to dataset which was not made available to us. We discussed and developed a general framework of data mining and optimization tools to extract useful information from sparse and non-standard datasets. These discussions lead to the training of Tricia Erhardt to develop Genetic Algorithm based search programs which were written in C++ and used to demonstrate the capability of GA algorithm in searching an optimal solution in noisy, datasets. From the study and discussion with NASA LeRC personnel, we then prepared a proposal, which is being submitted to NASA for future work for the development of data mining algorithms for engine conditional monitoring. The proposed set of algorithm uses wavelet processing for creating multi-resolution pyramid of tile data for GA based multi-resolution optimal search.

  5. Water protection problems in Sachsen mines

    International Nuclear Information System (INIS)

    Schmidt, R.

    2004-01-01

    European regulations must be integrated in national law in order to become valid in its member states. In Germany, the Mining Act was amended in 1990, and an environmental impact statement was introduced in the plan approval procedure. Further, a safety and health certificate was required by the new ordinance on safety in mining (ABBergV). At state level, the German states are still in the modification and integration procedure. In the state of Sachsen, it is intended to give privilege to all mining projects instead of just to lignite mining as in the past. (orig.) [de

  6. Research on the prevention of mine accident (II)

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Won Jai; Kang, Chang Hee; Lee, Sang Kwon; Lee, Jong Lim; Kang, Sang Soo [Korea Institute of Geology Mining and Materials, Taejon (Korea, Republic of)

    1996-12-01

    This Project is being underway to provide safety measures of the operating coal mines encouraged by the government. In the second project year, three objective coal mines, Jang Sung, Young Wol and Tae Baek, have been investigated. Jang Sung coal mine is encountering three major difficulties such as deep seam development scheme under the drainage level, appropriate control of vast ventilation networks, and hazard control from water inrush in the pocket type areas. Young Wol coal mine has various problems derived from the development of shallow depth such as problems along with the small scaled irregular mining system, penetration of surface water through the loose zone of overburden and unappropriated ventilation system and so on. In Tae Baek coal mine, the measures to prevent water inrush in thick seams, optimization of complicated ventilation and transportation system are the major problem to be tackled. This report analyzed the status of each mines in view of safety aspects and suggested the counter measures to solve the hazardous matters but, basically, it is requested to develop new technology to tackle the encountered difficulties. Besides the technical approaches, government base measures to encourage the operating coal mine is required. (author). 22 refs., tabs., figs.

  7. Recent developments in uranium resources and production with emphasis on in situ leach mining. Proceedings of a technical meeting

    International Nuclear Information System (INIS)

    2004-06-01

    An important role of the International Atomic Energy Agency is establishing contacts between Member States in order to foster the exchange of scientific and technical information on uranium production technologies. In situ leach (ISL) mining is defined as, the extraction of uranium from the host sandstone by chemical solutions and the recovery of uranium at the surface. ISL extraction is conducted by injecting a suitable leach solution into the ore zone below the water table; oxidizing, complexing, and mobilizing the uranium; recovering the pregnant solutions through production wells; and, finally, pumping the uranium bearing solution to the surface for further processing. As compared with conventional mining, in situ leach is recognized as having economic and environmental advantages when properly employed by knowledgeable specialists to extract uranium from suitable sandstone type deposits. Despite its limited applicability to specific types of uranium deposits, in recent years ISL uranium mining has been producing 15 to 21 per cent of world output. In 2002, ISL production was achieved in Australia, China, Kazakhstan, the United States of America and Uzbekistan. Its importance is expected to increase with new projects in Australia, China, Kazakhstan and the Russian Federation. The Technical Meeting on Recent Development in Uranium Resources and Production with Special Emphasis on In Situ Leach Mining, was held in Beijing from 18 to 20 September 2002, followed by the visit of the Yili ISL mine, Xinjiang Autonomous Region, China, from 21 to 23 September 2002. The meeting, held in cooperation with the Bureau of Geology, China National Nuclear Cooperation, was successful in bringing together 59 specialists representing 18 member states and one international organization (OECD/Nuclear Energy Agency). The papers describe a wide variety of activities related to the theme of the meeting. Subjects such as geology, resources evaluation, licensing, and mine restoration were

  8. A sustainable livelihood framework to implement CSR project in coal mining sector

    Directory of Open Access Journals (Sweden)

    Sapna A. Narula

    2017-01-01

    Full Text Available Corporate social responsibility (CSR in mining areas has increased momentum especially in countries like India where it has been made mandatory. The primary objective of this paper is to document actual social challenges of mining in field areas and find out how companies in the coal sector can work in a systematic manner to achieve uplift of affected communities. The first part of the paper draws evidence from three different bodies of literature, i.e. CSR and coal mining, capacity building and livelihood generation in mining areas. We try to converge the literature to propose a novel framework for livelihood generation work through capacity building with the help of CSR investments. The paper also documents a live case of planning and the implementation of capacity building activities in Muriadih coal mines in the Jharkhand state of India and offers lessons to both business and policy makers. The proposed framework has only been experimented in a local context, yet has the potential to be replicated in other mining areas.

  9. Fiscal 1998 engineer interchange project on the engineer interchange project (coal mine technology field), international interchange project. Preliminary study in Russia; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Russia)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    For the engineer interchange project (coal mine technology field), field survey for collecting information was made on the level and trend of production technology through visits to some coal industry organizations by specialists in Russia which is one candidate for the engineer training project by sending and receiving. Although coal is positioned as an important energy resource in Russia, poor business performance and a decrease in production are reported because of privatization and cur off of subsidies during a transfer period to a market economy. In addition, severe environment surrounding the Russian coal industry such as a delay of facility renewal due to poor funds, overage facilities, and moral reduction of workers due to a rationing delay has a potential for further reduction of production. The research group thus surveyed the current state of the Russian coal industry such as actual production structures, actual coal mines, technical levels, and various problem points in Moscow and Baykal districts. (NEDO)

  10. One last boom : Alberta's rapidly expanding oil mines may be the largest and messiest industrial projects in Canadian history

    International Nuclear Information System (INIS)

    Laird, G.

    2001-01-01

    The bitumen deposits of Alberta, 2.5 trillion barrels of oil, of which 300 billion are considered recoverable, represent the greatest single petroleum resources of the world, based on surface and subsurface calculations. Four deposits, covering an area the size of New Brunswick, are located in the area stretching from Cold Lake to Lloydminster (east of Edmonton), the upper reaches of the Athabasca River east to the Peace River. The largest by far is the Athabasca deposit in the vicinity of Fort McMurray, spread over 4.3 million hectares. The deposit is at the centre of the biggest industrial expansion witnessed by the province. Since 1996, 38 billion dollars worth of new projects have been announced. It is estimated that by 2025, the bulk of the national oil production will originate from open-pit mines and underground wells around Fort McMurray. This oil boom has economic benefits for the population, from welders to real estate agents to stakeholders. The environmental effects are not as beneficial. Huge strip mines are being carved next to the Athabasca River, with great amounts of greenhouse gases emissions. The Suncor and Syncrude oil-sands plants combined represent the fourth largest carbon dioxide emission source in Canada. The development of these projects dramatically affects global warming. The nitrogen and sulphur emissions could also acidify lakes and soil in the region. The Suncor mine resulted from the first boom to hit Fort McMurray in 1964. The Syncrude mine is the result of the second boom which took place in 1973. In 1996, Suncor installed a sulphur scrubber system that removes 95 per cent of sulphur dioxide from the electricity and steam-generation plant. Suncor also invested in various projects, such as wind-power, rainforest cultivation and biomass generation. The volume of pollution increases as the operations expand, even if operations are cleaner. If no new gains in pollution control are achieved, it is expected that by 2015, the total

  11. Uranium mining and its direction of development in China

    International Nuclear Information System (INIS)

    Feng Fuxian

    1993-01-01

    The features, current situation, achievements, problems and directions of development of uranium mining in China are presented. For over 30 years, the great successes have been achieved in the mining systems and technologies, the trackless mining and solution mining, the ventilation and radiation protection. But the economic benefit is still poor in mining due to the complex geological conditions, small ore bodies and their scattered distribution with lower uranium grade, low level of mechanization in mining and lower production efficiency. So it will be the direction of development in future to accelerate the development in mining science, to improve traditional mining technologies, to construct and to transform the mines with the purpose of increasing the benefit and decreasing the costs of production

  12. Experienced ethical issues of personalized data-mined media services

    DEFF Research Database (Denmark)

    Sørensen, Jannick Kirk

    2008-01-01

    This tentative PhD project description concerns the ethnographic examination of users’ experience of privacy issues and usability related to personalized data mined (web-) services for media content.......This tentative PhD project description concerns the ethnographic examination of users’ experience of privacy issues and usability related to personalized data mined (web-) services for media content....

  13. Stakeholders' Engagement Methods for the Mining Social Responsibility Practice: Determination of Local Issues and Concerns Related to the Mines Operations in Northwest of the US.

    Science.gov (United States)

    Masaitis, A.

    2014-12-01

    Every year, all around the world, global environmental change affects the human habitat. This is effect enhanced by the mining operation, and creates new challenges in relationship between the mining and local community. The purpose of this project are developed the Stakeholders engagement evaluation plan which is currently developed in University of Nevada, Reno for the Emigrant mining project, located in the central Nevada, USA, and belong to the Newmont Mining Corporation, one of the gold production leader worldwide. The needs for this project is to create the open dialog between Newmont mining company and all interested parties which have social or environmental impacts from the Emigrant mine. Identification of the stakeholders list is first and one of the most difficult steps in the developing of mine social responsibility. Stakeholders' engagement evaluation plan must be based on the timing and available resources of the mining company, understanding the goals for the engagement, and on analyzes of the possible risks from engagement. In conclusion, the Stakeholders engagement evaluation plan includes: first, determinations of the stakeholders list, which must include any interested or effected by the mine projects groups, for example: state and local government representatives, people from local communities, business partners, environmental NGOs, indigenous people, and academic groups. The contacts and availability for communication is critical for Stakeholders engagement. Next, is to analyze characteristics of all these parties and determinate the level of interest and level of their influence on the project. The next step includes the Stakeholders matrix and mapping development, where all these information will be put together.After that, must be chosen the methods for stakeholders' engagement. The methods usually depends from the goals of engagement (create the dialog lines, collect the data, determinations of the local issues and concerns, or establish

  14. Underground coal mining technology - the future

    Energy Technology Data Exchange (ETDEWEB)

    Lama, R P [Kembla Coal and Coke Pty Limited, Wollongong, NSW (Australia)

    1989-01-01

    Discusses development of underground coal mining in Australia in the last four decades. The following aspects are reviewed: technology for underground mining (longwall mining, unidirectional cutting, bidirectional cutting, operation of more than one shearer on a working face, optimum dimensions of longwall blocks), longwall productivity (productivity increase will depend on increasing the availability factor of equipment, reducing failures due to human errors, organizational models, improving on-site decision making, improving monitoring, maintenance, planning and scheduling, concept of 'Transparent Mine'), roadway development systems (types of heading machines, standard systems for mine drivage and roof bolting and their productivity), size of coal mines, man and material transport systems (20,000-30,000 t/d from a single longwall face, mine shafts with a diameter 9-10 m), mine layout design (layout of longwall blocks, main intakes and returns situated in rock layers), mine environmental systems (ventilation systems, gas control), management, training and interpersonal relationships. Future coal mines will be developed with an integral capacity of 8-10 Mt/a from a single longwall operation with main development arteries placed in rocks. Development of gate roadways will require novel solutions with continuous cutting, loading and bolting. Information technology, with the concept of 'transparent mine', will form the backbone of decision making.

  15. Sustainable geoengineering projects for the remediation of mine site

    Science.gov (United States)

    Martínez-Sanchez, Maria Jose; Perez-Sirvent, Carmen; Garcia-Lorenzo, Maria Luz; Martinez-Lopez, Salvadora; Gonzalez, Eva; Perez-Espinosa, Victor; Molina-Ruiz, Jose; Belen Martinez, Lucia; Hernandez, Carmen; Bech, Jaime; Hernandez-Cordoba, Manuel

    2015-04-01

    A large number of soils are contaminated by heavy metals due to mining activities, generating adverse effects on human health and the environment. In response to these negative effects, a variety of technologies have been developed. In situ immobilization by means of soil amendment is a non-intrusive and cost effective alternative that transforms the highly mobile toxic heavy metals to physico-chemically stable forms. Limestone filler is a good selection for such a purpose, because of its characteristics. In addition, the use of this amendment could revalorize the residues, reducing the costs of the process. The objective of this work was to evaluate the effectiveness of an immobilization technique in sediments contaminated by heavy metals. Two experimental areas, approximately 1 Ha each one, were selected, and technosols were developed as follows: original sediments, sediments mixed with limestone filler in a 1:1 proportion, gravel to avoid capillary and natural soil to allow plant growth. After the remediation technique was applied, monitoring was done in 18 points collecting samples (sediment and water) during a 4 years period at two month intervals. The pH and electrical conductivity as well as the heavy metal (Zn, Pb, Cd, Cu and As) contents were measured. Microtox bioassay was also applied. Sediments before the remediation technique showed acidic pH, high EC values and high trace elements content. The results obtained after the immobilization showed that sediment samples had neutral pH (average value of 8.3) low electrical conductivity (1.32 dS m-1) and low trace elements concentration. It can be concluded that the use of limestone filler is an excellent option in sediments polluted because of the risk for human health or ecosystem disappears or is decreased in a large extent. In addition, the designed experience allows stabilizer proportion to be optimized and may suppose a big cost-saving in the project in areas affected by mining activities.

  16. Origin of acid mine drainage in Enugu

    International Nuclear Information System (INIS)

    Uma, K.O.

    1992-01-01

    Mine flooding is a serious problem in the Enugu Coal Mines and has led to the abandonment of two of the four mines. About 1800 m 3 of water is pumped out daily from the mines into the nearby streams. The source of this enormous volume of water has been established based on the hydrodynamics and hydrology of the area. Two prolific aquifers - an unconfined and a confined system - overlie the mines, but the mine water is derived principally from the unconfined aquifer. The pathway of flow is, provided by the numerous fractures connecting the two aquifers and the mine tunnel. The major hydrochemical activity resulting in pollution of the mine water occurs within the sumps in the floor of the longwalls. These sumps act as oxidation chambers where groundwater from the fractures mixes and subsequently reacts with sulfur-rich solutes released by coal mining. Contrary to general belief, the mine drainage has not seriously degraded the chemistry of receiving streams. The pH and electric conductivity, representing, the dissolved ions, were increased less than 10% of the values in the unaffected region

  17. Minerals and energy: major development projects - April 2006 listing

    Energy Technology Data Exchange (ETDEWEB)

    William Mollard [Australian Bureau of Agricultural and Resource Economics (ABARE), Canberra, ACT (Australia)

    2006-06-15

    ABARE's project list, released around May and November each year, lists completed and committed projects in the minerals and energy sector in Australia. Santos' $200 million Casino gas field project in Bass Strait will produce natural gas and condensate while output from Berwyndale South will be coal seam methane. Five coal projects were completed in the six months to April 2006. The largest of these was Xstrata's Newlands Northern underground mine. In the same region, BMA's (BHP Billiton Mitsubishi Alliance) $102 million Broadmeadow underground mine and BHP/Mitsui Coal's $50 million Poitrel opencut mine, both near Moranbah, were brought into production. In New South Wales, two projects a new mine and a mine infrastructure development, both near Singletonwere commissioned. Xstrata's new Ravensworth West opencut mine will produce up to 1.5 million tonnes a year of thermal coal. Excel Coal's $73 million Wambo Rail project involved building a rail loop and loading facilities at its Wambo operation. Queensland coal mine projects and coal infrastructure developments account for 19 per cent (or $6.3 billion) of the estimated capital cost of $34 billion for all advanced projects. The largest coal mine development is the $1 billion Dawson mine expansion which is expected to add around 12 million tonnes of coking and thermal coal capacity, commencing in early 2007. Anglo Coal/Mitsui is also developing the large new Lake Lindsay opencut mine. Rio Tinto is developing its $440 million Clermont opencut mine. Twelve other advanced coal mine developments in Queensland are expected to raise coal production capacity by around 30 million tonnes a year by 2008. 10 figs., 4 tabs.

  18. Environmental noise management in the area of opencast mines

    Directory of Open Access Journals (Sweden)

    Lilić Nikola

    2017-01-01

    Full Text Available Environmental noise constitutes a threat regarding disturbance and deterioration of quality of living. There are numerous sources of environmental noise, among others mine objects, traffic roads etc. In Serbian practice open cast mines are commonly in vicinity of residential areas, which is the case of the Field C open cast coal mine and the Barosevac settlement. More complexity is added to noise management in such conditions through additional noise sources, not directly linked to mine objects and activities, such as local or regional roads. This paper describes an approach to noise management for the purpose of environmental noise impact reduction, from both traffic and industrial sources, related to the project Environmental Improvement Project in Kolubara Mine Basin in Barosevac settlement, as a part of acquisition of new Excavator-belt Conveyor-Stacker (ECS system.

  19. 75 FR 79016 - Notice of Availability of the Final Environmental Impact Statement for the Newmont Mining...

    Science.gov (United States)

    2010-12-17

    ... Newmont Mining Corporation Emigrant Project Plan of Operation, Nevada AGENCY: Bureau of Land Management... Mining Corporation Emigrant Project Plan of Operations and by this notice is announcing its availability...: Copies of the EIS for the Newmont Mining Corporation Emigrant Project Plan of Operation are available for...

  20. Economical Recovery of By-products in the Mining Industry

    Energy Technology Data Exchange (ETDEWEB)

    Berry, J.B.

    2001-12-05

    The U.S. Department of Energy (DOE) Office of Industrial Technologies, Mining Industry of the Future Program, works with the mining industry to further the industry's advances toward environmental and economic goals. Two of these goals are (1) responsible emission and by-product management and (2) low-cost and efficient production (DOE 1998). DOE formed an alliance with the National Mining Association (NMA) to strengthen the basis for research projects conducted to benefit the mining industry. NMA and industry representatives actively participate in this alliance by evaluating project proposals and by recommending research project selection to DOE. Similarly, the National Research Council (NRC) has recently and independently recommended research and technology development opportunities in the mining industry (NRC 2001). The Oak Ridge National Laboratory (ORNL) and Colorado School of Mines engineers conducted one such project for DOE regarding by -product recovery from mining process residue. The results of this project include this report on mining industry process residue and waste with opportunity for by-product recovery. The U.S. mineral processing industry produces over 30,000,000 metric tons per year of process residue and waste that may contain hazardous species as well as valuable by-products. This study evaluates the copper, lead, and zinc commodity sectors which generate between 23,300,000 and 24,000,000 metric tons per year. The distribution of residual elements in process residues and wastes varies over wide ranges* because of variations in the original ore content as it is extracted from the earth's crust. In the earth's crust, the elements of interest to mining fall into two general geochemical classifications, lithophiles and chalcophiles** (Cox 1997). Groups of elements are almost always present together in a given geochemical classification, but the relative amounts of each element are unique to a particular ore body. This paper

  1. Groundwater restoration of uranium ISL mines in the United States

    International Nuclear Information System (INIS)

    Catchpole, G.; Kuchelka, R.

    1993-01-01

    Although the in-situ leach (ISL) mining of uranium in the US started in the 1960's, the real expansion of this form of mining, which is also called solution mining, took place in the early to mid 1970's in Texas. Some of the early test work used an acid lixiviant but it was soon recognized that, because of environmental considerations, the use of alkaline lixiviants would be preferable to the regulatory agencies and the public. In the past, the two types of alkaline based lixiviants used at US ISL mines were ammonia bicarbonate and sodium bicarbonate. A few ISL mines get by with just adding carbon dioxide to the well field solution. Ammonia bicarbonate is no longer being used today in the US because of the difficulties and expense of restoring the water quality to acceptable standards following mining. This paper briefly describes ISL mining principles and then details procedures and techniques used at USA ISL uranium mines to restore water quality in the mined aquifer. The basic elements are fairly constant but there can be considerable variation in type of water treatment equipment, methods of waste water disposal and use of chemical reducing agents. Three case histories are also presented

  2. A REIA Study of Marble Mining Activities in District- Nagaur (Rajasthan

    Directory of Open Access Journals (Sweden)

    Mohammed Arif

    2016-08-01

    Full Text Available Conventional and unscientific mining poses severe threat to life, public property and continuation of mining in the area. Incompatible land uses, huge waste dumps and large scale land transformation have resulted in land degradation, ponding, flooding, water contamination and health hazards in Makrana mining area. Segregation of dumps, compatible land use, research and development activity for use of marble slurry are suggested measures for reclamation and restoration of the degraded land. While for the purpose of development and economic upliftment of people, there is a need for establishment of industrial project, but these have to be environmentally friendly. Therefore it is essential to assess the impacts of mining on different environmental parameters, before starting the mining operations, so that abatement measures could be planned in advance for eco-friendly mining in the area. Environmental impact assessment (EIA is a systematic process that examines the environmental consequences of development action like mining, cement, transport, river valley. EIA systematically examines booth beneficial and adverse consequences of the proposed project and ensures that these impacts are taken into account during the project design.

  3. Scalable Frequent Subgraph Mining

    KAUST Repository

    Abdelhamid, Ehab

    2017-06-19

    A graph is a data structure that contains a set of nodes and a set of edges connecting these nodes. Nodes represent objects while edges model relationships among these objects. Graphs are used in various domains due to their ability to model complex relations among several objects. Given an input graph, the Frequent Subgraph Mining (FSM) task finds all subgraphs with frequencies exceeding a given threshold. FSM is crucial for graph analysis, and it is an essential building block in a variety of applications, such as graph clustering and indexing. FSM is computationally expensive, and its existing solutions are extremely slow. Consequently, these solutions are incapable of mining modern large graphs. This slowness is caused by the underlying approaches of these solutions which require finding and storing an excessive amount of subgraph matches. This dissertation proposes a scalable solution for FSM that avoids the limitations of previous work. This solution is composed of four components. The first component is a single-threaded technique which, for each candidate subgraph, needs to find only a minimal number of matches. The second component is a scalable parallel FSM technique that utilizes a novel two-phase approach. The first phase quickly builds an approximate search space, which is then used by the second phase to optimize and balance the workload of the FSM task. The third component focuses on accelerating frequency evaluation, which is a critical step in FSM. To do so, a machine learning model is employed to predict the type of each graph node, and accordingly, an optimized method is selected to evaluate that node. The fourth component focuses on mining dynamic graphs, such as social networks. To this end, an incremental index is maintained during the dynamic updates. Only this index is processed and updated for the majority of graph updates. Consequently, search space is significantly pruned and efficiency is improved. The empirical evaluation shows that the

  4. The Wiluna Uranium Project, Western Australia: Bringing a new project to the market

    International Nuclear Information System (INIS)

    Guthrie, V.

    2014-01-01

    The Wiluna Uranium Project is the first uranium mine in Western Australia to receive Government environmental approval since government policy was changed in 2008 to allow uranium mining in Western Australia. Located 960 km northeast of Perth in remote central Western Australia, the Wiluna Project comprises 76.5 million pounds U_3O_8 [~29,000 tU] in six shallow, calcrete-hosted carnotite uranium deposits. Mining is planned at a rate of 1.3 million tonnes annually to produce 2 million pounds U_3O_8 [~770 tU] production using an alkali leach process. The Project requires initial capital investment of AUD$315M and has an operating cost of US$29-31 per pound [~75-~80 USD/kgU]. During the four years it has taken to gain environmental approval, Toro also progressed technical studies to validate the economic and technical viability of the Project. These included the initial Preliminary Feasibility (PFS) to define the processing train; mining optimisation studies, a Resource Evaluation Pit (REP) and a commercial scale Pilot Plant to verify the mining and processing technologies; and finally, Phase 1 of the Definitive Feasibility Study (DFS) which focussed on the processing plant design. (author)

  5. Law 19.126. It dictate Regulatory standards about Mining of great bearing

    International Nuclear Information System (INIS)

    2013-01-01

    It statute rules for regulating mining projects of great size, ownership, location, related mining activities, mine closure plan, exploitation concession contract, taxation regime, canon, infractions and sanctions

  6. Reduced analysis and confirmatory research on co-adaptability theoretical solution to conflicting events in construction engineering projects

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    The co-adaptability theoretical solution to conflicting events in construction engineering projects has three problems. First, the transformation of constraint conditions of theoretical solution is very difficult in practical engineering applications; second, some coefficients are difficult to be determined; third, there are overfull circular arithmetic operations involved in it. To resolve these problems, a new method to reduce the theoretical solution complications is proposed. By analyzing the operating mechanism of theoretical solution model, redundancies in the theoretical solution can be eliminated, and the ISM mapping with the co-adaptability solution can be set up. Based on this approach, a procedure to solve practical conflicting events in construction projects is established by replacing characteristic variables with mathematic variables. The research results show that the procedure can replace the co-adaptability theoretical solution effectively and solve practical conflicting events in construction projects.

  7. Public Consultation Processes in Greenland Regarding the Mining Industry

    Directory of Open Access Journals (Sweden)

    Maria Ackrén

    2016-05-01

    Full Text Available Since the Greenland Self-Government Act came into force in 2009, economic development and the right to utilize natural resources in Greenland lies in the hands of the Self-Government. Earlier efforts to establish this authority were made back in the 1970s, when discussions on Home Rule were first on the agenda. Mining industries are not a new activity in Greenland. During the Second World War, Greenlandic cryolite was used to produce aluminum for the North American aircraft industry. Other essential natural resources, such as gold and gemstones, have also received international interest over the years. Greenland's new development aim is to build up a large-scale mining industry. This article elucidates the form of public consultation processes followed in Greenland in connection with two large-scale mining projects and the different views various actors have regarding these events. How did the deliberative democratic process unfold in Greenland regarding these projects? Was the process followed an effective way to manage these kinds of projects? The article shows that two projects that received a lot of media attention: the 2005 iron ore mine project in Isukasia, and the 2001 TANBREEZ-project to extract rare earth elements, used highly different approaches when it comes to deliberative democracy. In the former case, a limited degree of deliberative democracy was used, while in the latter case, the opposite applies.

  8. Construction and modernization of underground and surface mines. [USSR

    Energy Technology Data Exchange (ETDEWEB)

    Burshtein, N M

    1983-12-01

    Development of the Sredazugol' association in Soviet Central Asia from 1976 to 1985 is discussed. From 1976 to 1980 investment in the association amounted to 151 million rubles, 87.5 million of which fell on construction. Major development projects of the 1976-1980 period are reviewed: construction of new mining levels in underground coal mines, development of a number of operating surface mines, modernization of earthmoving and mining equipment, development of mine haulage by locomotives and railroad cars, improving occupational safety in coal mining, increasing slope stability in surface mining, especially in the area of the Atchinsk landslide in the Angren mine. From 1981 to 1985 investment in the Sredazugol' association should amount to 202 million rubles, of which 126 million rubles will be spent on construction. Investment will be 35% higher than in the 1976-1980 period and investment in mine construction 43% higher. The largest development project will be modernization of the Angren surface mine and increasing its targeted coal output from 5.2 Mt/y to 10.3 Mt/y by 1990. Modernization and reconstruction of the Angren mine will be carried out in 2 stages. Coal output of the mine will increase by 1.2 Mt/y in the current 5 year plan (by 1985), and by 3.9 Mt/y in the next 5 year period. Reconstruction and development of the Angren mine will cost approximately 254 million rubles. Mining and earthmoving equipment which will be used in the Angren mine is reviewed: EhRGV-630 bucket wheel excavators, EhSh-10/70 and EhSh-13/50 walking draglines, etc.

  9. Technology overview of mined repositories

    International Nuclear Information System (INIS)

    Gimera, R.; Thirumalai, K.

    1982-01-01

    Mined repositories present an environmentally viable option for permanent disposal of nuclear waste. This paper reviews the state-of-the-art mining technologies and identifies technological issues and developments necessary to mine a repository in basalt. The thermal loading, isolation, and retrieval requirements of a repository present unique technological challenges unknown to conventional mining practice. The technology issues and developments required in the areas of excavation, roof and ground support, equipment development, instrumentation development, and sealing are presented. Performance assessment methods must be developed to evaluate the adequacies of technologies developed to design, construct, operate, and decommission a repository. A stepwise test-and-development approach is used in the Basalt Waste Isolation Project to develop cost-effective technologies for a repository

  10. Deep Heat Mining in Geneva. Second part; Deep Heat Mining; Projet GGP (Geothermie de Grande Profondeur) Geneve. Etape 3 - Deuxieme partie

    Energy Technology Data Exchange (ETDEWEB)

    Wilhelm, J.

    2003-07-01

    The project with name GGP ('Geothermie de Grande Profondeur') pertains to deep heat mining in the region of Geneva, Switzerland. Seismic observations have shown that the original idea of using an exploratory borehole down to a depth of 3,700 meters is justified. A suitable location for this drilling experiment including additional geological investigations could be found in the near community of Bernex. Another advantage of this location is that its existing district heating system including an industrial compound of the City of Geneva is well suited for distributing the heat produced by the future geothermal pilot plant. Engineers also suggest that the combination with a gas turbine could be an interesting solution for Geneva. The GGP project has been repeatedly promoted by talks and reports in the daily press as well as in radio and TV programmes. In addition, an easily understandable leaflet has been made available.

  11. Definition and validation of process mining use cases

    NARCIS (Netherlands)

    Ailenei, I.; Rozinat, A.; Eckert, A.; Aalst, van der W.M.P.; Daniel, F.; Barkaoui, K.; Dustdar, S.

    2012-01-01

    Process mining is an emerging topic in the BPM marketplace. Recently, several (commercial) software solutions have become available. Due to the lack of an evaluation framework, it is very difficult for potential users to assess the strengths and weaknesses of these process mining tools. As the first

  12. Influence of surface water accumulations of the Stupnica creek on underground coal mining in the Durdevic coal mine

    Energy Technology Data Exchange (ETDEWEB)

    Valjarevic, R; Urosevic, V

    1986-01-01

    Discusses hydrological, geological and mining conditions at the Durdevic underground coal mine. A landslide at a spoil bank dammed the creek flowing above the mine. Two exploratory boreholes (62 m and 68 m) were drilled for hydrological investigations. Water coloring techniques, chemical water analysis, measurement of underground water level and water flow were used to determine whether a sudden inrush of rainfall and accumulated surface water could endanger the mine. Underground water inflow to mine rooms varies from 110-200 m/sup 3//min, depending on the season. Diversion of the creek bed with the accumulated water and accumulation and subsequent drainage of surface water via large diameter concrete pipes were considered as possible ways of improving safety in the mine. Details of these projects are included. 4 refs.

  13. Practical mine ventilation optimization based on genetic algorithms for free splitting networks

    Energy Technology Data Exchange (ETDEWEB)

    Acuna, E.; Maynard, R.; Hall, S. [Laurentian Univ., Sudbury, ON (Canada). Mirarco Mining Innovation; Hardcastle, S.G.; Li, G. [Natural Resources Canada, Sudbury, ON (Canada). CANMET Mining and Mineral Sciences Laboratories; Lowndes, I.S. [Nottingham Univ., Nottingham (United Kingdom). Process and Environmental Research Division; Tonnos, A. [Bestech, Sudbury, ON (Canada)

    2010-07-01

    The method used to optimize the design and operation of mine ventilation has generally been based on case studies and expert knowledge. It has yet to benefit from optimization techniques used and proven in other fields of engineering. Currently, optimization of mine ventilation systems is a manual based decision process performed by an experienced mine ventilation specialist assisted by commercial ventilation distribution solvers. These analysis tools are widely used in the mining industry to evaluate the practical and economic viability of alternative ventilation system configurations. The scenario which is usually selected is the one that reports the lowest energy consumption while delivering the required airflow distribution. Since most commercial solvers do not have an integrated optimization algorithm network, the process of generating a series of potential ventilation solutions using the conventional iterative design strategy can be time consuming. For that reason, a genetic algorithm (GA) optimization routine was developed in combination with a ventilation solver to determine the potential optimal solutions of a primary mine ventilation system based on a free splitting network. The optimization method was used in a small size mine ventilation network. The technique was shown to have the capacity to generate good feasible solutions and improve upon the manual results obtained by mine ventilation specialists. 9 refs., 7 tabs., 3 figs.

  14. The measurement and inclusion of a stochastic ore-grade uncertainty in mine valuations using PDEs

    OpenAIRE

    Evatt, G. W.; Johnson, P. V.; Duck, P. W.; Howell, S. D.

    2010-01-01

    Mining companies world-wide are faced with the problem of how to accurately value and plan extraction projects subject to uncertainty in both future price and ore grade. Whilst the methodology of modelling price uncertainty is reasonably well understood, modelling ore-grade uncertainty is a much harder problem to formulate, and when attempts have been made the solutions have taken unfeasibly long times to compute. This paper provides a new partial differential equations approach to the proble...

  15. Japanese-South African collaboration to mitigate seismic risks in deep gold mines

    CSIR Research Space (South Africa)

    Ogasawara, H

    2009-09-01

    Full Text Available Japanese-South African collaborative project entitled "Observational study to mitigate seismic risks in mines". The project will build on previous studies carried out by Japanese seismologists in South African mines, and will develop human and instrumental...

  16. Environmental conflict analysis using an integrated grey clustering and entropy-weight method: A case study of a mining project in Peru.

    OpenAIRE

    Delgado-Villanueva, Kiko Alexi; Romero Gil, Inmaculada

    2016-01-01

    [EN] Environmental conflict analysis (henceforth ECA) has become a key factor for the viability of projects and welfare of affected populations. In this study, we propose an approach for ECA using an integrated grey clustering and entropy-weight method (The IGCEW method). The case study considered a mining project in northern Peru. Three stakeholder groups and seven criteria were identified. The data were gathered by conducting field interviews. The results revealed that for the groups urban ...

  17. Method of removing uranium and its compounds from mine wastewaters and from aqueous solutions discharged in hydrometallurgical uranium ore treatment

    International Nuclear Information System (INIS)

    Jilek, R.; Prochazka, H.; Kuhr, I.; Fuska, J.; Nemec, P.; Katzer, J.

    1974-01-01

    The separation of uranium and its compounds from mine wastewaters and from water solutions discharged from uranium ore hydrometallurgical treatment, and its eventual simultaneous concentration in the biomass during uranium ore technological processing are described. The solutions are replenished with nutrients necessary for the growth of microorganisms, mainly with nitrogen, carbon and phosphorus and inoculated with fungi. During submersion cultivation, uranium incorporates in the mycelium, or is bound physico-chemically to the mycelium components. Together with these components, uranium is mechanically separated, i.e., by filtration, centrifugation or sedimentation. Organisms of the Fungi imperfecti class, mainly the Aspergillus and Penicillium genera are used for cultivation which may be continuous or semicontinuous. (B.S.)

  18. An ISU study of asteroid mining

    Science.gov (United States)

    Burke, J. D.

    During the 1990 summer session of the International Space University, 59 graduate students from 16 countries carried out a design project on using the resources of near-earth asteroids. The results of the project, whose full report is now available from ISU, are summarized. The student team included people in these fields: architecture, business and management, engineering, life sciences, physical sciences, policy and law, resources and manufacturing, and satellite applications. They designed a project for transporting equipment and personnel to a near-earth asteroid, setting up a mining base there, and hauling products back for use in cislunar space. In addition, they outlined the needed precursor steps, beginning with expansion of present ground-based programs for finding and characterizing near-earth asteroids and continuing with automated flight missions to candidate bodies. (To limit the summer project's scope the actual design of these flight-mission precursors was excluded.) The main conclusions were that asteroid mining may provide an important complement to the future use of lunar resources, with the potential to provide large amounts of water and carbonaceous materials for use off earth. However, the recovery of such materials from presently known asteroids did not show an economic gain under the study assumptions; therefore, asteroid mining cannot yet be considered a prospective business.

  19. Rehabilitation of residual pits in post-mining area: a goal of Czech brown coal opencast mining industry

    International Nuclear Information System (INIS)

    Svoboda, I.

    1997-01-01

    The closure of surface brown coal mines is a complex process with many specific considerations. In the Czech Republic a special project was proposed to analyze the types of environmental disturbance generated by surface mining operations and suggest procedures for the affected areas. It also aims to propose rehabilitation techniques for residual pits, considering their future use for recreational or development purposes. A Chabarovice mine case study demonstrates how to solve the problem of water flooding and utilization of the future residual lake. 2 figs

  20. CSIR Division of Mining Technology annual review 1993/94

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The Division of Mining Technology of the CSIR (Council for Scientific and Industrial Research) works in partnership with the mining industry to solve problems threatening the health, safety and well-being of the workforce, and the productivity of mining operations through the development and implementation of knowledge and technology. The annual review describes the Division's research projects in the following field: rock engineering (for gold, platinum and coal mining); mining environment; occupational hygiene; surface environment; and mining equipment and systems (systems and equipment, orebody information, coal mining and causes of accidents). Details are also given of the Division's publications, research and consultancy services and information centre.

  1. Computerization of administration and operation management in Polish black coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Mastej, R.; Syrkiewicz, J. (Centralny Osrodek Informatyki Gornictwa (Poland))

    1990-08-01

    Characterizes main solutions of the computerized management model adopted in Poland for the mining industry and the technical and oganizational structure of computer system application. Computer systems for black coal mines and the range of microprocessor application are shown in block diagrams. The COIG mining information center makes about 45 computer system modules with independent implementation available for black coal mines. The general concept foresees central data processing in the COIG center on the ODRA 1305 and ICL 297 computers with the G-3 operating system in the first stage and an ICL series 39 computer with the VME operating system in the second stage. For mines where no transmission lines are available local solutions based on smaller ICL computers, minicomputers or computer networks with the NOVELL network operating system or multi-access systems with the UNIX operating system are planned. 3 refs.

  2. Oil sands tailings management project

    Energy Technology Data Exchange (ETDEWEB)

    Godwalt, C. [Alberta WaterSMART, Calgary, AB (Canada); Kotecha, P. [Suncor Energy Inc, Calgary, AB (Canada); Aumann, C. [Alberta Innovates - Technology Futures, Alberta Governement, AB (Canada)

    2010-11-15

    The Oil sands leadership initiative (OSLI) works with the Government of Alberta on the development of the oil sands industry, considering environmental, economical and social aspects. Water management was identified as one of most important areas to focus on. Alberta WaterSMART was requested to support the development and the management of projects resulting from the work done or underway in this field. The development of a regional water management solution stood out as the most interesting solution to obtain significant results. In the Athabasca Region, oil sands producers work independently on their water sourcing and disposal with particular attention to fresh water conservation and economics. The Athabasca River represents a source for mines and distant saline aquifers are the target of steam assisted gravity drainage (SAGD) operators. As part of a four-phase project aiming to study the environmental and economic footprint (EEF) benefit of alternatives for Athabasca oil sands production water supply and disposal, the purpose of the tailings water management project was to identify tailings treatment technologies that are ready to be implemented, and to design and evaluate solutions in order to improve regional oil sands production water sourcing and disposal. Alternatives were evaluated based on their total EEF, applying a lifecycle assessment methodology with a particular attention on the quantification of important performance indicators. 25 refs., 8 tabs., 40 figs.

  3. Oil sands tailings management project

    International Nuclear Information System (INIS)

    Godwalt, C.; Kotecha, P.; Aumann, C.

    2010-11-01

    The Oil sands leadership initiative (OSLI) works with the Government of Alberta on the development of the oil sands industry, considering environmental, economical and social aspects. Water management was identified as one of most important areas to focus on. Alberta WaterSMART was requested to support the development and the management of projects resulting from the work done or underway in this field. The development of a regional water management solution stood out as the most interesting solution to obtain significant results. In the Athabasca Region, oil sands producers work independently on their water sourcing and disposal with particular attention to fresh water conservation and economics. The Athabasca River represents a source for mines and distant saline aquifers are the target of steam assisted gravity drainage (SAGD) operators. As part of a four-phase project aiming to study the environmental and economic footprint (EEF) benefit of alternatives for Athabasca oil sands production water supply and disposal, the purpose of the tailings water management project was to identify tailings treatment technologies that are ready to be implemented, and to design and evaluate solutions in order to improve regional oil sands production water sourcing and disposal. Alternatives were evaluated based on their total EEF, applying a lifecycle assessment methodology with a particular attention on the quantification of important performance indicators. 25 refs., 8 tabs., 40 figs.

  4. The future of European mining: What should our mining industry learn from the Skouries and Rosia Montana community gold conflicts

    Science.gov (United States)

    Hardy, Liam; Heller, Shaun; Faltyn, Rowan; Stefanaki, Anna; Economidou, Romina; Savin, Irina; Hood, Leo; Conway, Christopher

    2017-04-01

    The popular image of mining portrayed by media and by a majority of public opinion is a dominantly negative one. From worker's rights to environmental damages, disasters such as the Copiapó mine collapse (Chile), the acid mine drainage at Lousal (Portugal) and the Pb contamination of waters around the Tyndrum mines (Scotland) overshadow initiatives like the ICMM. Some companies receive little praise despite creating active community education and investment projects, while others simply build higher barbed wire fences and attempt to weather the protests, budgeting them into mine life assessments. This image problem, combined with the decentralised political segregation of Europe and the increased power of grass-roots protest initiatives (such as Antigold in Greece), has resulted in mining companies joining a long list of industries effected by the 'auto-protest' reaction in face of development, regardless of potential regional and national benefits, there is a pre-existing lack of trust in corporate and government powers to protect community interests. The poor management of existing licences is thus becoming a significant danger to future operations and the wider industry. Here we report on the Rosia Montana dispute (Romania) and the ongoing Skouries conflict (Greece). We then discuss how the European mining industry may need to significantly adapt its exploration and community engagement strategies to avoid future conflicts and, present a recent example of how effective suitably organised community engagement projects can be for local mining initiatives from Southern Portugal.

  5. Production of uranium in Navoi Mining and Metallurgy Combinat, Uzbekistan

    International Nuclear Information System (INIS)

    Kuchersky, N.; Tolstov, E.A.; Mazurkevich, A.P.; Inozemzev, S.B.

    2001-01-01

    Full text: Under the conditions of constantly increasing level of development of the nuclear power, it is inevitable that the uranium stockpiles accumulated to 1985 will soon be depleted. This consideration underlies the development concept of uranium production in the Navoi Mining and Metallurgy Combinat, Uzbekistan. Because this product has become a source of hard currency revenues for the Republic, there will be a significant increase in the processed ore and output of uranium oxide within the next few years. Uranium production in the Navoi Mining and Metallurgy Combinat represents a full-cycle operations ranging from geological survey through hydrometallurgical processing resulting in the output of uranium concentrate in the form of uranium protoxide-oxide (U 3 O 8 ). The NMMC uranium operations include the Hydrometallurgical Plant and three facilities accomplishing ISL mining facilities. A successful start on the development of the Uchkuduk deposit by ISL method in the 1960s gave rise to scientific and production approach for development of other uranium deposits of the infiltration bedded (sandstone) type. Uranium recovery by ISL has become a separate mining branch within the 30-year period of its history and the contribution of this branch in uranium production has steadily grown. Since 1995 all uranium produced by Navoi Mining and Metallurgy Combinat is attributed to ISL. During this evolution period of the ISL method, a whole range of systematic scientific research and practical works were carried out covering improvement of process flowsheets, equipment, operational methods and techniques for particular mining conditions at those specific sites. In co-operation with design and scientific research institutions, a significant number of scientific researches, test works, design and engineering projects were achieved in order to create optimal conditions for ISL mining and further processing of pregnant solutions by sorption as well as to appropriately equip

  6. Impact of Jabiluka mine expected to be small

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    The draft Environmental Impact Statement (ESI) for the proposed uranium mines at Jabiluka, about 20 Km north of the existing Ranger mine in the Northern Territory was released on 17 October 1996. The EIS concluded that any impact of the proposed mine will be localised, small-scale and temporary. Jabiluka will contribute some $3.8 billion to national economic welfare over the project's predicted 28-year life

  7. 76 FR 19786 - Notice of Availability of the Draft Environmental Impact Statement for the Celatom Mine Expansion...

    Science.gov (United States)

    2011-04-08

    ... Vale, Oregon. The Celatom Mine Complex currently consists of three open-pit mines: Kelley Field (on BLM... within the Project Area. Activities under the Proposed Action, including final reclamation, would be... the Project Area include open pit mines, roads within the mine operations areas, and other operations...

  8. Removal method of radium in mine water by filter sand

    International Nuclear Information System (INIS)

    Taki, Tomihiro; Naganuma, Masaki

    2003-01-01

    Trace radium is contained in mine water from the old mine road in Ningyo-Toge Environmental Engineering Center, JNC. We observed that filter sand with hydrated manganese oxide adsorbed radium in the mine water safely for long time. The removal method of radium by filter sand cladding with hydrated manganese oxide was studied. The results showed that radium was removed continuously and last for a long time from mine water with sodium hypochlorite solution by passing through the filter sand cladding with hydrated manganese. Only sodium hypochlorite solution was used. When excess of it was added, residue chlorine was used as chlorine disinfection. Filter sand cladding with hydrated manganese on the market can remove radium in the mine water. The removal efficiency of radium is the same as the radium coprecipitation method added with barium chloride. The cost is much lower than the ordinary methods. Amount of waste decreased to about 1/20 of the coprecipitation method. (S.Y.)

  9. The financing of new mining ventures

    International Nuclear Information System (INIS)

    Etheredge, D.A.; Lilja, J.R.

    1983-01-01

    Various options are presented for tackling the problem in mining today of the high capital costs required for a new mine combined with the front end exposure that the exploiters face. Equity finance from the producers, private investors, oil companies, consumers and governments is discussed as well as loan finance from export credit agencies, international agencies, production-related loans, leasing and commercial bank loans. The future in financing mining is outlined and it is proposed that the future will lie in smaller projects financed primarily with equity. (U.K.)

  10. Towards an evaluation framework for process mining systems

    NARCIS (Netherlands)

    Ailenei, I.; Rozinat, A.; Eckert, A.; Aalst, van der W.M.P.

    2011-01-01

    Process mining is an emerging topic in the BPM marketplace. Recently, several (commercial) software solutions have become available. Due to the lack of an evaluation framework, it is very dif¿cult for potential users to assess the strengths and weaknesses of these process mining tools. As the ¿rst

  11. WASTE WATER TREATMENT AND MANAGEMENT TECHNIQUES IN MINES

    OpenAIRE

    Navneet S. Pote*

    2017-01-01

    Mining industries enhance comfort of human life on one hand but this also cause pollution to air and water which are essential for survival of life. Therefore, mining and industrial activity adversely affects the ecosystem including wild life population due to deforestation, fragmentation, to habitat, air and water pollution. Eliminating the mining activities is not the solution to this problem. Hence, it is important to find the most suitable and applicable methods to reduce the pollution ca...

  12. The effect of time-dependent ventilation and radon (thoron) gas emanation rates in underground uranium mines

    International Nuclear Information System (INIS)

    Bigu, J.

    1987-01-01

    A theoretical radiation mine model, suitable for underground uranium mines, has been investigated. In this model, the rate of ventilation and/or the radon (thoron) gas emanation from mine walls are time-dependent. Several cases of practical interest have been investigated including sinusoidal, linear, exponential, stepwise, or a combination of two or more of the above. Analytical solutions were obtained for the time-dependent radon (thoron) gas emanation rate. However, because of the extreme analytical complexity of the solutions corresponding to the time-dependent ventilation rate case, numerical solutions were found using a special Runge-Kutta procedure and the Hamming's modified predictor-corrector method for the solution of linear initial-value problems. The mine model makes provisions for losses of radioactivity, other than by ventilation and radioactive decay, by, say, plate-out on mine walls, and by other mechanisms. Radioactivity data, i.e., radon, thoron, and their progeny, obtained with the above mine model for a number of ventilation and emanation conditions, are presented. Experimental data obtained in an inactive stope of an underground uranium mine for a time-dependent air flow case are shown. Air flow conditions (ventilation rate) were determined by tracer gas techniques using SF 6

  13. Nuclear heating solutions. Realizations and projects

    International Nuclear Information System (INIS)

    Dumitrescu, Monica; Prisecaru, Ilie

    2009-01-01

    Considering the present situation of thermal energy in Romania and having in view the fact that Romania is a Kyoto protocol signatory state one estimates that the development of the nuclear energy will have a promising growth. According with the statement of the National Energetic Observer, Romania became a net energy resource importer for the past 30 years and the estimations about the future are not optimistic. The finite reserves of fossil fuel (coal and natural gas), the gradual reduction of their share in the national energy balance with a tendency to become insignificant after 2025, as well as the present situation of the thermal power plants which are already beyond their operation life, all these indicate the nuclear energy as being the most reliable and sustainable future source for thermal energy production. Having in view these circumstances the paper aims at a short presentation of the existing nuclear solutions for district heating. Also, reviewed are the reactor projects that are under different development stage in the world, as well as the best nuclear solutions to be possibly implemented in Romania. The article represents a synthesis of the documentation made by PhD student Monica Dumitrescu in her preparation stage. (authors)

  14. The application of the analytic hierarchy process (AHP) in uranium mine mining method of the optimal selection

    International Nuclear Information System (INIS)

    Tan Zhongyin; Kuang Zhengping; Qiu Huiyuan

    2014-01-01

    Analytic hierarchy process, AHP, is a combination of qualitative and quantitative, systematic and hierarchical analysis method. Basic decision theory of analytic hierarchy process is applied in this article, with a project example in north Guangdong region as the research object, the in-situ mining method optimization choose hierarchical analysis model is established and the analysis method, The results show that, the AHP model for mining method selecting model was reliable, optimization results were conformity with the actual use of the in-situ mining method, and it has better practicability. (authors)

  15. Alternative utilization of underground spaces with abandoned mine openings

    Energy Technology Data Exchange (ETDEWEB)

    Chung, So Keul; Cho, Won Jai; Han, Kong Chang; Choi, Sung Oong [Korea Institute of Geology Mining and Materials, Taejon (Korea)

    1998-12-01

    Utilization of the openings of the abandoned mines could be planned by the principal parameters such as location and geotechnical impact. The local governments have not only to lead the each stage of the utilization project from the very beginning of conceptual design up to the construction stage, but also to promote the project for the development of public purpose. The possible tentative candidates for the utilization of the abandoned mine openings which are supported by the local governments could be summarized as follows. a. The Gahak mine of Kwangmyung, Kyunggi: The mine caverns which have been served as the storage of the pickled fishes, could be reexcavated by taking into consideration the geotechnical parameters for the public use such as: 1) Training center for the youth, 2) Fermentation and storehouse of marine products, 3) Sightseeing resort, 4) Sports and leisure complex, 5) Underground parking lot, 6) Underground shopping mall and chilled room storage, 7) Library, concert hall and museum. b. Hamtae mine of Taebaek, Kangwon: The Hambaek main haulage way and its shaft should be investigated in detail in order to find out a possible use as the underground challenging park of the coal mining operation. c. Mines of Boryung and Hongsung, Chungnam: Lots of mine caverns have been used as the storehouse for the pickled shrimp. However, they have to be promoted to a large scale industries. d. Imgok mine of Kwangju and Palbong mine of Jeongeup, Chunbuk: Mine caverns which have been used as the storehouse of pickles, need a detailed investigation for alternative promotion. e. Yongho mine of Pusan Dalsung mine of Taegu: Both of the mines are located near metropolitan communities. Reconstruction of the old mine caverns of the Yongho mine is highly recommended for a public use. The caverns of the Dalsung mine could be utilized as the storage facilities. Detailed geotechnical survey and sit investigation could be suggested to design the recommended facilities for both

  16. Mine Waste Disposal and Managements

    Energy Technology Data Exchange (ETDEWEB)

    Cheong, Young-Wook; Min, Jeong-Sik; Kwon, Kwang-Soo [Korea Institute of Geology Mining and Materials, Taejon (KR)] (and others)

    1999-12-01

    This research project deals with: Analysis and characterization of mine waste piles or tailings impoundment abandoned in mining areas; Survey of mining environmental pollution from mine waste impounds; Modelling of pollutants in groundwater around tailings impoundment; Demonstration of acid rock drainage from coal mine waste rock piles and experiment of seeding on waste rock surface; Development of a liner using tailings. Most of mine wastes are deposited on natural ground without artificial liners and capping for preventing contamination of groundwater around mine waste piles or containments. In case of some mine waste piles or containments, pollutants have been released to the environment, and several constituents in drainage exceed the limit of discharge from landfill site. Metals found in drainage exist in exchangeable fraction in waste rock and tailings. This means that if when it rains to mine waste containments, mine wastes can be pollutant to the environment by release of acidity and metals. As a result of simulation for hydraulic potentials and groundwater flow paths within the tailings, the simulated travel paths correlated well with the observed contaminant distribution. The plum disperse, both longitudinal and transverse dimensions, with time. Therefore liner system is a very important component in tailings containment system. As experimental results of liner development using tailings, tailings mixed with some portion of resin or cement may be used for liner because tailings with some additives have a very low hydraulic conductivity. (author). 39 refs.

  17. Injection of FGD Grout to Abate Acid Mine Drainage in Underground Coal Mines

    Energy Technology Data Exchange (ETDEWEB)

    Mafi, S.; Damian, M.T.; Senita, R.E.; Jewitt, W.C.; Bair, S.; Chin, Y.C.; Whitlatch, E.; Traina, S.; Wolfe, W.

    1997-07-01

    Acid Mine Drainage (AMD) from abandoned underground coal mines in Ohio is a concern for both residents and regulatory agencies. Effluent from these mines is typically characterized by low pH and high iron and sulfate concentrations and may contaminate local drinking-water supplies and streams. The objective of this project is to demonstrate the technical feasibility of injecting cementitious alkaline materials, such as Flue Gas Desulfurization (FGD) material to mitigate current adverse environmental impacts associated with AMD in a small, abandoned deep mine in Coshocton County Ohio. The Flue Gas Desulfurization material will be provided from American Electric Power`s (AEP) Conesville Plant. It will be injected as a grout mix that will use Fixated Flue Gas Desulfurization material and water. The subject site for this study is located on the border of Coshocton and Muskingum Counties, Ohio, approximately 1.5 miles south-southwest of the town of Wills Creek. The study will be performed at an underground mine designated as Mm-127 in the Ohio Department of Natural Resources register, also known as the Roberts-Dawson Mine. The mine operated in the mid-1950s, during which approximately 2 million cubic feet of coal was removed. Effluent discharging from the abandoned mine entrances has low pH in the range of 2.8-3.0 that drains directly into Wills Creek Lake. The mine covers approximately 14.6 acres. It is estimated that 26,000 tons of FGD material will be provided from AEP`s Conesville Power Plant located approximately 3 miles northwest of the subject site.

  18. Injection of FGD Grout to Abate Acid Mine Drainage in Underground Coal Mines

    International Nuclear Information System (INIS)

    Mafi, S.; Damian, M.T.; Senita, R.E.; Jewitt, W.C.; Bair, S.; Chin, Y.C.; Whitlatch, E.; Traina, S.; Wolfe, W.

    1997-07-01

    Acid Mine Drainage (AMD) from abandoned underground coal mines in Ohio is a concern for both residents and regulatory agencies. Effluent from these mines is typically characterized by low pH and high iron and sulfate concentrations and may contaminate local drinking-water supplies and streams. The objective of this project is to demonstrate the technical feasibility of injecting cementitious alkaline materials, such as Flue Gas Desulfurization (FGD) material to mitigate current adverse environmental impacts associated with AMD in a small, abandoned deep mine in Coshocton County Ohio. The Flue Gas Desulfurization material will be provided from American Electric Power's (AEP) Conesville Plant. It will be injected as a grout mix that will use Fixated Flue Gas Desulfurization material and water. The subject site for this study is located on the border of Coshocton and Muskingum Counties, Ohio, approximately 1.5 miles south-southwest of the town of Wills Creek. The study will be performed at an underground mine designated as Mm-127 in the Ohio Department of Natural Resources register, also known as the Roberts-Dawson Mine. The mine operated in the mid-1950s, during which approximately 2 million cubic feet of coal was removed. Effluent discharging from the abandoned mine entrances has low pH in the range of 2.8-3.0 that drains directly into Wills Creek Lake. The mine covers approximately 14.6 acres. It is estimated that 26,000 tons of FGD material will be provided from AEP's Conesville Power Plant located approximately 3 miles northwest of the subject site

  19. The Key Lake project

    International Nuclear Information System (INIS)

    1991-01-01

    Key Lake is located in the Athabasca sand stone basin, 640 kilometers north of Saskatoon, Saskatchewan, Canada. The three sources of ore at Key Lake contain 70 100 tonnes of uranium. Features of the Key Lake Project were described under the key headings: work force, mining, mill process, tailings storage, permanent camp, environmental features, worker health and safety, and economic benefits. Appendices covering the historical background, construction projects, comparisons of western world mines, mining statistics, Northern Saskatchewan surface lease, and Key Lake development and regulatory agencies were included

  20. False alarms and mine seismicity: An example from the Gentry Mountain mining region, Utah

    International Nuclear Information System (INIS)

    Taylor, S.R.

    1992-01-01

    Mining regions are a cause of concern for monitoring of nuclear test ban treaties because they present the opportunity for clandestine nuclear tests (i.e. decoupled explosions). Mining operations are often characterized by high seismicity rates and can provide the cover for excavating voids for decoupling. Chemical explosions (seemingly as part of normal mining activities) can be used to complicate the signals from a simultaneous decoupled nuclear explosion. Thus, most concern about mines has dealt with the issue of missed violations to a test ban treaty. In this study, we raise the diplomatic concern of false alarms associated with mining activities. Numerous reports and papers have been published about anomalous seismicity associated with mining activities. As part of a large discrimination study in the western US (Taylor et al., 1989), we had one earthquake that was consistently classified as an explosion. The magnitude 3.5 disturbance occurred on May 14, 1981 and was conspicuous in its lack of Love waves, relative lack of high- frequency energy, low Lg/Pg ratio, and high m b - M s . A moment-tensor solution by Patton and Zandt (1991) indicated the event had a large implosional component. The event occurred in the Gentry Mountain coal mining region in the eastern Wasatch Plateau, Utah. Using a simple source representation, we modeled the event as a tabular excavation collapse that occurred as a result of normal mining activities. This study raises the importance of having a good catalogue of seismic data and information about mining activities from potential proliferant nations

  1. The influence of deep mining damping on the processes in lithosphere and environment. Příbram uranium deposit after termination of mining

    Czech Academy of Sciences Publication Activity Database

    Martinec, Petr; Brož, Milan; Rudajev, Vladimír; Číž, Radim; Vencovský, Miloš; Živor, Roman

    -, č. 14 (2005), s. 43-49 ISSN 1214-9691 R&D Projects: GA AV ČR(CZ) IBS3086005 Institutional research plan: CEZ:AV0Z30860518 Keywords : uranium industry * underground exploitation Subject RIV: DH - Mining, incl. Coal Mining

  2. Radiological data acquisition, investigation and evaluation of mining relics

    International Nuclear Information System (INIS)

    1992-01-01

    Within the scope of a Federal Project, the environmental radioactivity and the radon concentration in buildings caused by mining relics in the new Federal Lands of Germany are investigated. In the first phase of the project, about 8000 relics of former mining were identified by analysing existing documents, categorised, and recorded in a special data bank. Thereby, 'areas of suspicion' of 1500 km 2 spaciously defined in the beginning could be reduced to 'areas of investigation' of 250 km 2 now to be examined in close coordination with the land and district authorities by a programme gradually adapted to the radiological significance of the relics. Experience with site-specific measuring programmes have already been gained through three pilot projects at typical sites of former mining activities. Recommendations of the German Radiation Protection Commission serve for the evaluation of the results. By the measuring programme for radon in buildings of mining and geological predestined regions more than 25000 buildings of 210 communities have been investigated. The results confirm the expected prevailing influence of the geologic underground on the radon concentration. Extreme values are observed where direct connections additionally exist to mining relics in the ground. (orig./HP) With 11 figs. in annex [de

  3. The Ranger project - a case study

    International Nuclear Information System (INIS)

    Young, R.I.

    1983-01-01

    Ranger Uranium Mines Pty. Ltd. operates an open pit mine and ore treatment plant in the Northern Territory designed to produce 3000 tonne/yr of U 3 O 8 from 3500 tonne/day of mill feed. The construction of the project was completed in 1981. Wright-Davy were the project managers and designers of the $270 million ore treatment plant and associated infrastructure. Details of project cost, staffing, project design and project systems are given

  4. Mining of high utility-probability sequential patterns from uncertain databases.

    Directory of Open Access Journals (Sweden)

    Binbin Zhang

    Full Text Available High-utility sequential pattern mining (HUSPM has become an important issue in the field of data mining. Several HUSPM algorithms have been designed to mine high-utility sequential patterns (HUPSPs. They have been applied in several real-life situations such as for consumer behavior analysis and event detection in sensor networks. Nonetheless, most studies on HUSPM have focused on mining HUPSPs in precise data. But in real-life, uncertainty is an important factor as data is collected using various types of sensors that are more or less accurate. Hence, data collected in a real-life database can be annotated with existing probabilities. This paper presents a novel pattern mining framework called high utility-probability sequential pattern mining (HUPSPM for mining high utility-probability sequential patterns (HUPSPs in uncertain sequence databases. A baseline algorithm with three optional pruning strategies is presented to mine HUPSPs. Moroever, to speed up the mining process, a projection mechanism is designed to create a database projection for each processed sequence, which is smaller than the original database. Thus, the number of unpromising candidates can be greatly reduced, as well as the execution time for mining HUPSPs. Substantial experiments both on real-life and synthetic datasets show that the designed algorithm performs well in terms of runtime, number of candidates, memory usage, and scalability for different minimum utility and minimum probability thresholds.

  5. Carbon Sequestration on Surface Mine Lands

    Energy Technology Data Exchange (ETDEWEB)

    Donald Graves; Christopher Barton; Richard Sweigard; Richard Warner; Carmen Agouridis

    2006-03-31

    Since the implementation of the federal Surface Mining Control and Reclamation Act of 1977 (SMCRA) in May of 1978, many opportunities have been lost for the reforestation of surface mines in the eastern United States. Research has shown that excessive compaction of spoil material in the backfilling and grading process is the biggest impediment to the establishment of productive forests as a post-mining land use (Ashby, 1998, Burger et al., 1994, Graves et al., 2000). Stability of mine sites was a prominent concern among regulators and mine operators in the years immediately following the implementation of SMCRA. These concerns resulted in the highly compacted, flatly graded, and consequently unproductive spoils of the early post-SMCRA era. However, there is nothing in the regulations that requires mine sites to be overly compacted as long as stability is achieved. It has been cultural barriers and not regulatory barriers that have contributed to the failure of reforestation efforts under the federal law over the past 27 years. Efforts to change the perception that the federal law and regulations impede effective reforestation techniques and interfere with bond release must be implemented. Demonstration of techniques that lead to the successful reforestation of surface mines is one such method that can be used to change perceptions and protect the forest ecosystems that were indigenous to these areas prior to mining. The University of Kentucky initiated a large-scale reforestation effort to address regulatory and cultural impediments to forest reclamation in 2003. During the three years of this project 383,000 trees were planted on over 556 acres in different physiographic areas of Kentucky (Table 1, Figure 1). Species used for the project were similar to those that existed on the sites before mining was initiated (Table 2). A monitoring program was undertaken to evaluate growth and survival of the planted species as a function of spoil characteristics and

  6. Geochemical pollution as a result of ore mining in the Erzgebirge mountains - assessment and solutions

    International Nuclear Information System (INIS)

    Beuge, P.; Degner, T.

    2000-01-01

    Mining was, is and will be associated with great influences to the environment. These influences are various in form and extent. In the Ore Mountains, one of the oldest mining districts in Europe, we find a lot of problems due to the mining of various oretypes over several hundred years. The biggest problem is the water pollution by acid mine drainage, another one the enormous land use by tailing dams, pits and dumps. To appraise the degree of water or soil pollution it is necessary to use local higher background values, especially for deposit characteristic elements like arsenic or zinc. Within the mines some types of barriers occur, like the formation of secondary minerals or the precipitation of metal hydroxids. Up to 80% of the primarily mobilised metals can be retarded by these barrier systems. One of the most successful and economical ways to reduce the pollution of the environment caused by mining is to characterise and support such naturally occuring barriers. (orig.)

  7. Frequent Pattern Mining Algorithms for Data Clustering

    DEFF Research Database (Denmark)

    Zimek, Arthur; Assent, Ira; Vreeken, Jilles

    2014-01-01

    that frequent pattern mining was at the cradle of subspace clustering—yet, it quickly developed into an independent research field. In this chapter, we discuss how frequent pattern mining algorithms have been extended and generalized towards the discovery of local clusters in high-dimensional data......Discovering clusters in subspaces, or subspace clustering and related clustering paradigms, is a research field where we find many frequent pattern mining related influences. In fact, as the first algorithms for subspace clustering were based on frequent pattern mining algorithms, it is fair to say....... In particular, we discuss several example algorithms for subspace clustering or projected clustering as well as point out recent research questions and open topics in this area relevant to researchers in either clustering or pattern mining...

  8. Grey relation projection model for evaluating permafrost environment in the Muli coal mining area, China

    Energy Technology Data Exchange (ETDEWEB)

    Wei Cao; Yu Sheng; Yinghong Qin; Jing Li; Jichun Wu [Chinese Academy of Sciences, Lanzhou (China). State Key Laboratory of Frozen Soil Engineering

    2010-12-15

    This study attempts to estimate the current stage of the permafrost environment in the Muli coal mining area, an opencast mining site in the Qinghai-Tibet plateau, China. The estimation is done by regarding this site's permafrost environment as a system which was divided into three subsystems consisting of permafrost freeze-thaw erosion sensibility, permafrost thermal stability, and permafrost ecological fragility. The subsystems were characterized with their influencing indicators, each of which was assigned with a weight according to analytic hierarchy process. The relationship between these indictors is established using an environmental evaluation model based on grey system theory. The evaluated results show that currently the normalised grey relation projection values (GRPV) of permafrost freezing-thawing erosion sensibility, permafrost thermal stability, permafrost ecological fragility and permafrost environment are 0.58 (general situation), 0.47 (bad situation), 0.63 (general situation) and 0.56 (general situation), respectively. These values imply that the permafrost environment has been deteriorated to a certain degree by human activities and potentially could be further degraded. However, at this degree, a new equilibrium could be achieved if the current environmental degradation ratio is held and if effective treatments are constructed against further damages.

  9. Injection of alkaline ashes into underground coal mines for acid mine drainage abatement

    International Nuclear Information System (INIS)

    Aljoe, W.W.

    1996-01-01

    The injection of alkaline coal combustion waste products into abandoned underground coal mines for acid mine drainage (AMD) abatement has obvious conceptual appeal. This paper summarizes the findings of the baseline hydrogeologic and water quality evaluations at two sites--one in West Virginia and one in Maryland--where field demonstrations of the technique are being pursued in cooperative efforts among State and Federal agencies and/or private companies. The West Virginia site produces severe AMD from three to seven AMD sources that are spaced over about a 1.2 km stretch of the down-dip side of the mine workings. By completely filling the most problematic portion of the mine workings with coal combustion ashes, the State expects that the costs and problems associated with AMD treatment will be greatly reduced. At the Maryland site, it is expected that the AMD from a relatively small target mine will be eliminated completely by filling the entire mine void with a grout composed of a mixture of fly ash, fluidized-bed combustion ash, and flue gas desulfurization sludge. This project will also demonstrate the potential cost-effectiveness of the technique at other sites, both for the purpose of AMD remediation and control of land subsidence

  10. Data Mining and Analysis

    Science.gov (United States)

    Samms, Kevin O.

    2015-01-01

    The Data Mining project seeks to bring the capability of data visualization to NASA anomaly and problem reporting systems for the purpose of improving data trending, evaluations, and analyses. Currently NASA systems are tailored to meet the specific needs of its organizations. This tailoring has led to a variety of nomenclatures and levels of annotation for procedures, parts, and anomalies making difficult the realization of the common causes for anomalies. Making significant observations and realizing the connection between these causes without a common way to view large data sets is difficult to impossible. In the first phase of the Data Mining project a portal was created to present a common visualization of normalized sensitive data to customers with the appropriate security access. The tool of the visualization itself was also developed and fine-tuned. In the second phase of the project we took on the difficult task of searching and analyzing the target data set for common causes between anomalies. In the final part of the second phase we have learned more about how much of the analysis work will be the job of the Data Mining team, how to perform that work, and how that work may be used by different customers in different ways. In this paper I detail how our perspective has changed after gaining more insight into how the customers wish to interact with the output and how that has changed the product.

  11. Effects of coal gangue content on water movement and solute transport in a China loess plateau soil

    Energy Technology Data Exchange (ETDEWEB)

    Beibei, Zhou; Quanjiu, Wang [Institute of Water Resources and Hydro-electric Engineering, Xi' an University of Technology, Xi' an (China); State Key Laboratory of Soil Erosion and Dryland Farming on the Loess Plateau, Institute of Soil and Water Conservation, Northwest A and F University, Yangling, Shaanxi (China); Ming' an, Shao; Mingxia, Wen [State Key Laboratory of Soil Erosion and Dryland Farming on the Loess Plateau, Institute of Soil and Water Conservation, Northwest A and F University, Yangling, Shaanxi (China); College of Resources and Environment, Northwest A and F University, Yangling, Shaanxi (China); Horton, Robert [Department of Agronomy, Iowa State University, Ames, Iowa (United States)

    2010-11-15

    The mining industry has grown strongly in China in recent decades, resulting in large amounts of coal gangues, which cause water and soil pollution, soil erosion, and various other environmental problems. They are often used in reclamation projects in attempts to restore land damaged by mining, hence they are frequently present (in widely varying proportions) in the topsoil in areas around mines. Their presence can strongly affect key soil variables, including its bulk density, structure, water retention, water movement, and solute transport rates. In the study presented here, the effects of gangue contents on infiltration, saturated hydraulic conductivity, and solute transport parameters of a Chinese Loess plateau soil were examined. The results show that infiltration rates and saturated hydraulic conductivity decreased with increasing gangue content. The Peck-Watson equation modeled these relationships well, but Bouwer-Rice equations provided poorer matches with the acquired data. Cumulative infiltration over time was described well by both the Philip equation and Kostiakov equation. Both the simplified convection-dispersion equation and a two-region model described the solute transport processes well. In addition, the dispersion increased, while both the Peclet number and mobile water fraction decreased, with increases in gangue contents. (Copyright copyright 2010 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  12. Actual Uranium Exploration and Mining Activities in Niger

    International Nuclear Information System (INIS)

    Kache, Mamane

    2014-01-01

    Conclusion: Since the Fukushima nuclear power plant accident in 2011, many mining companies are not interested in uranium. It leads to the decrease in uranium spot price and the delay of IMOURAREN Project. Only, 47 exploration licenses for 12 mining companies are now valid in Niger.

  13. Impact of acid mine drainage from mining exploitations on the Margajita River basin and the Hatillo reservoir (Dominican Republic)

    International Nuclear Information System (INIS)

    Grandia, F.; Salas, J.; Arcos, D.; Archambault, A.; Cottard, F.

    2009-01-01

    Mining of the Pueblo Viejo high-sulphidation epithermal deposit (Dominican Republic) leads to environmental impact due to the formation of acid mine drainage associated with the oxidative dissolution of sulphides and sulpho salts. In addition to the very low pH, the acid waters are capable of transporting away from the mining areas high concentrations of metals and metalloids in solution. In the present work, a geochemical study of sediments deposited in the Hatillo reservoir is carried out. This reservoir is fed by the Margajita and Yuna streams which transport leachates from the Pueblo Viejo and Falcondo-Bonao (Cr-Ni) mining areas, respectively. The results show that these sediments have very high concentrations of Fe, Al and sulphate, along with significant amounts of As, Zn and Te, which are of especial environmental concern. The main contributor to this metal discharge into the reservoir is the Margajita stream, whereas the Yuna stream does not transport significant amounts of metals in solution due to its neutral pH, although it is likely that metals such as Mn, Cr, Ni and Co can be mobilised as a particulate. (Author) 5 refs.

  14. Preliminary results of radiation monitoring near uranium mines in Namibia EJOLT Project (DRAFT version)

    International Nuclear Information System (INIS)

    Chareyron, Bruno

    2012-01-01

    As a part of the EJOLT (Environmental Justice Organizations Liability and Trade) project, EARTHLIFE Namibia and CRIIRAD (Commission for Independent Research and Information about Radiation) have organised visits in areas located in the vicinity of uranium mines in Namibia In the course of an on site mission carried out between September 22 and October 2 2011, scientists from the CRIIRAD laboratory took radiation measurements in situ, and collected 14 samples of top soil, 13 samples of surface sediments of the Swakop, Gawib and Khan rivers, 11 underground water samples in the alluvium of Swakop, and Khan rivers and tap water from Arandis city, and one sample of asparagus. Solid samples have been analysed at the CRIIRAD laboratory in France (measurements performed by HpGe gamma spectrometry) and water samples have been monitored for main chemicals by LDA 26 laboratory in France and for radium 226 and radon 222 at the CRIIRAD laboratory. Some of the preliminary findings are summarised in this report: 1 - The dose rate measured by CRIIRAD on the parking of Roessing mine is about 6 times above natural background value (0.9 μSv/h compared to 0.15 μSv/h); 2 - The management of waste rock dumps needs to be improved: Some waste rocks are dumped on the banks of Khan river (at the intersection with Dome Gorge) without fencing and confinement. The radiological impact of this activity has to be studied in detail but preliminary measurements show various impacts on the environment; 3 - The finest fraction of the radioactive tailings dumped on Roessing tailings dam is blown away by the wind and contaminates the surrounding environment; 4 - The high uranium concentration in underground water collected downstream Roessing uranium mine in the Khan river and Swakop river alluvium raises the question of the origin of this uranium

  15. Preliminary results of radiation monitoring near uranium mines in Namibia EJOLT Project (DRAFT version)

    Energy Technology Data Exchange (ETDEWEB)

    Chareyron, Bruno

    2012-04-05

    As a part of the EJOLT (Environmental Justice Organizations Liability and Trade) project, EARTHLIFE Namibia and CRIIRAD (Commission for Independent Research and Information about Radiation) have organised visits in areas located in the vicinity of uranium mines in Namibia In the course of an on site mission carried out between September 22 and October 2 2011, scientists from the CRIIRAD laboratory took radiation measurements in situ, and collected 14 samples of top soil, 13 samples of surface sediments of the Swakop, Gawib and Khan rivers, 11 underground water samples in the alluvium of Swakop, and Khan rivers and tap water from Arandis city, and one sample of asparagus. Solid samples have been analysed at the CRIIRAD laboratory in France (measurements performed by HpGe gamma spectrometry) and water samples have been monitored for main chemicals by LDA 26 laboratory in France and for radium 226 and radon 222 at the CRIIRAD laboratory. Some of the preliminary findings are summarised in this report: 1 - The dose rate measured by CRIIRAD on the parking of Roessing mine is about 6 times above natural background value (0.9 {mu}Sv/h compared to 0.15 {mu}Sv/h); 2 - The management of waste rock dumps needs to be improved: Some waste rocks are dumped on the banks of Khan river (at the intersection with Dome Gorge) without fencing and confinement. The radiological impact of this activity has to be studied in detail but preliminary measurements show various impacts on the environment; 3 - The finest fraction of the radioactive tailings dumped on Roessing tailings dam is blown away by the wind and contaminates the surrounding environment; 4 - The high uranium concentration in underground water collected downstream Roessing uranium mine in the Khan river and Swakop river alluvium raises the question of the origin of this uranium

  16. Energy efficient technologies for the mining industry

    Energy Technology Data Exchange (ETDEWEB)

    Klein, B.; Bamber, A.; Weatherwax, T.; Dozdiak, J.; Nadolski, S.; Roufail, R.; Parry, J.; Roufail, R.; Tong, L.; Hall, R. [British Columbia Univ., Vancouver, BC (Canada). Centre for Environmental Research in Minerals, Metals and Materials, Norman B. Keevil Inst. of Mining Engineering

    2010-07-01

    Mining in British Columbia is the second largest industrial electricity consumer. This presentation highlighted methods to help the mining industry reduce their energy requirements by limiting waste and improving efficiency. The measures are aimed at optimizing energy-use and efficiency in mining and processing and identifying opportunities and methods of improving this efficiency. Energy conservation in comminution and beneficiation is a primary focus of research activities at the University of British Columbia (UBC). The objective is to reduce energy usage in metal mines by 20 per cent overall. Open pit copper, gold and molybdenum mines are being targeted. Projects underway at UBC were outlined, with particular reference to energy usage, recovery and alternative energy sources; preconcentration; reducing energy usage from comminution in sorting, high pressure grinding rolls and high speed stirred mills; Hydromet; other energy efficient technologies such as control and flotation; and carbon dioxide sequestration. Studies were conducted at various mining facilities, including mines in Sudbury, Ontario. tabs., figs.

  17. Geological Feasibility of Underground Oil Storage in Jintan Salt Mine of China

    Directory of Open Access Journals (Sweden)

    Xilin Shi

    2017-01-01

    Full Text Available A number of large underground oil storage spaces will be constructed in deep salt mines in China in the coming years. According to the general geological survey, the first salt cavern oil storage base of China is planned to be built in Jintan salt mine. In this research, the geological feasibility of the salt mine for oil storage is identified in detail as follows. (1 The characteristics of regional structure, strata sediment, and impermeable layer distribution of Jintan salt mine were evaluated and analyzed. (2 The tightness of cap rock was evaluated in reviews of macroscopic geology and microscopic measuring. (3 According to the geological characteristics of Jintan salt mine, the specific targeted formation for building underground oil storage was chosen, and the sealing of nonsalt interlayers was evaluated. (4 Based on the sonar measuring results of the salt caverns, the characteristics of solution mining salt caverns were analyzed. In addition, the preferred way of underground oil storage construction was determined. (5 Finally, the results of closed well observation in solution mining salt caverns were assessed. The research results indicated that Jintan salt mine has the basic geological conditions for building large-scale underground oil storage.

  18. Technology assessment of in situ uranium mining

    International Nuclear Information System (INIS)

    Cowan, C.E.

    1981-01-01

    The objective of the PNL portion of the Technology Assessment project is to provide a description of the current in situ uranium mining technology; to evaluate, based on available data, the environmental impacts and, in a limited fashion, the health effects; and to explore the impediments to development and deployment of the in situ uranium mining technology

  19. Social Licensing in uranium mining: Experiences from the IAEA review of the planned Mukju River Uranium Project, Tanzania

    International Nuclear Information System (INIS)

    Schnell, H.; Hilton, J.; Saint-Pierre, S.; Baldry, K.; Fan, Z.; Tulsidas, H.

    2014-01-01

    The IAEA Uranium Production Site Appraisal Team (UPSAT) programme is designed to assist Member States to enhance the operational performance and the occupational, public and environmental health and safety of uranium mining and processing facilities across all phases of the uranium production cycle. The scope of the appraisal process includes exploration, resource assessment, planning, environmental and social impact assessment, mining, processing, waste management, site management, remediation, and final closure. An UPSAT review was requested in 2010 by the United Republic of Tanzania (URT) to address the challenges the country is currently facing in developing its uranium mining and processing capability for the first time. The review that was carried out from 27 May to 5 June, 2013 had the objective to to appraise URT’s preparedness for overseeing the Uranium Production Cycle in general, at the same time focusing on the planned Mkuju River Project (MRP) in the south of the country in particular. The UPSAT team was tasked to report its findings according to five primary areas: 1. Regulatory system; 2. Sustainable uranium production life cycle; 3. Health, Safety and Environment (HSE); 4. Social licensing; 5. Capacity building. The paper will discuss the key findings and suggestions that were provided to governmental stakeholders and the operater to improve the planned operations. (author)

  20. Study of the application of ERTS-A imagery to fracture-related mine safety hazards in the coal mining industry

    Science.gov (United States)

    Wier, C. E.; Wobber, F. J. (Principal Investigator); Russell, O. R.; Amato, R. V.

    1972-01-01

    The author has identified the following significant results. Various data compilation and analysis activities in support of ERTS-1 imagery interpretation are in progress or are completed. These include the compilation of mine accident data, areas of mine roof instability and the analysis of high altitude color infrared photography and low altitude color and color infrared photography which was acquired by NASA in support of the project. The photography reveals that many fracture lineaments are detectable through a varied thickness of glacial till. These data will be compiled on a series of 1:250,000 scale base maps and evaluated for a correlation between fracture zones and mine accidents and rooffalls. Due to high occurrence of cloud cover in the project area and to the delay in imagery shipments, little progress has been made in the analysis of ERTS-1 imagery.

  1. 77 FR 74845 - AJT Mining Properties, Inc.; Notice of Surrender of Preliminary Permit

    Science.gov (United States)

    2012-12-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14115-001] AJT Mining Properties, Inc.; Notice of Surrender of Preliminary Permit Take notice that AJT Mining Properties, Inc., permittee for the proposed Yeldagalga Creek Hydroelectric Project, has requested that its preliminary permit...

  2. Improving underground ventilation conditions in coal mines

    CSIR Research Space (South Africa)

    Meyer, CF

    1993-11-01

    Full Text Available projects could be initiated by miningtek in co-operation with different mines. This report deals with the findings of this project and also deals with the future of research within Miningtek with regard to underground ventilation....

  3. THE THEORETIC-METHODOLOGICAL TOOLS OF EFFECTIVE ESTIMATION OF ORGANIZATION TECHNOLOGICAL SOLUTIONS OF CONSTRUCTION PROJECT

    Directory of Open Access Journals (Sweden)

    E. Yu. Antipenko

    2010-03-01

    Full Text Available In the article the structural analysis of efficiency indices elements of organization-and-technology solutions of construction project scheduling is executed for preparation of high-quality base of providing the planning processes and subsequent realization of the projects.

  4. Underground Mining Method Selection Using WPM and PROMETHEE

    Science.gov (United States)

    Balusa, Bhanu Chander; Singam, Jayanthu

    2018-04-01

    The aim of this paper is to represent the solution to the problem of selecting suitable underground mining method for the mining industry. It is achieved by using two multi-attribute decision making techniques. These two techniques are weighted product method (WPM) and preference ranking organization method for enrichment evaluation (PROMETHEE). In this paper, analytic hierarchy process is used for weight's calculation of the attributes (i.e. parameters which are used in this paper). Mining method selection depends on physical parameters, mechanical parameters, economical parameters and technical parameters. WPM and PROMETHEE techniques have the ability to consider the relationship between the parameters and mining methods. The proposed techniques give higher accuracy and faster computation capability when compared with other decision making techniques. The proposed techniques are presented to determine the effective mining method for bauxite mine. The results of these techniques are compared with methods used in the earlier research works. The results show, conventional cut and fill method is the most suitable mining method.

  5. IT Data Mining Tool Uses in Aerospace

    Science.gov (United States)

    Monroe, Gilena A.; Freeman, Kenneth; Jones, Kevin L.

    2012-01-01

    Data mining has a broad spectrum of uses throughout the realms of aerospace and information technology. Each of these areas has useful methods for processing, distributing, and storing its corresponding data. This paper focuses on ways to leverage the data mining tools and resources used in NASA's information technology area to meet the similar data mining needs of aviation and aerospace domains. This paper details the searching, alerting, reporting, and application functionalities of the Splunk system, used by NASA's Security Operations Center (SOC), and their potential shared solutions to address aircraft and spacecraft flight and ground systems data mining requirements. This paper also touches on capacity and security requirements when addressing sizeable amounts of data across a large data infrastructure.

  6. Tanjung Enim IV coal exploration project. Volume III. Preliminary mining plan for South Arahan area

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Based on the results of the survey carried out at Tanjung Enim in South Sumatra, a mining plan in the South Arahan area was studied. The plan was studied with geological structure, coal quality and social basement facilities as restriction conditions, with the mining amount, selling price and land transportation expenses as fluctuation factors, and using the optimum mining area determination method (pit optimizer), etc. The results of the survey were classified into the following 11 items: 1) assumptions; 2) pit optimization; 3) pit design; 4) long term scheduling; 5) detailed scheduling; 6) waste dumping; 7) mining equipment model case simulation; 8) mine facilities; 9) mine economics; 10) investigation of coal transportation; 11) conclusion. In 1), study was made on geological modeling, coal quality data and mining economics. (NEDO)

  7. Best practice in situ recovery uranium mining in Australia

    International Nuclear Information System (INIS)

    Lambert, I.B.; McKay, A.D.; Carson, L.J.

    2010-01-01

    The Australian Government policy is to ensure that uranium mining, milling and rehabilitation is based on world best practice standards. A best practice guide for in situ recovery (ISR) uranium mining has been developed to communicate the Australian Government's expectations with a view to achieving greater certainty that ISR mining projects meet Australian Government policy and consistency in the assessment of ISR mine proposals within multiple government regulatory processes. The guide focuses on the main perceived risks; impacts on groundwaters, disposal of mining residues, and radiation protection. World best practice does not amount to a universal template for ISR mining because the characteristics of individual ore bodies determine the best practice. (author)

  8. Numerical solution of electrostatic problems of the accelerator project VICKSI

    International Nuclear Information System (INIS)

    Janetzki, U.

    1975-03-01

    In this work, the numerical solution to a few of the electrostatic problems is dealt with which have occured within the framework of the heavy ion accelerator project VICKSI. By means of these selected examples, the versatile applicability of the numerical method is to be demonstrated, and simultaneously assistance is given for the solution of similar problems. The numerical process for solving ion-optics problems consists generally of two steps. In the first step, the potential distribution for a given boundary value problem is iteratively calculated for the Laplace equation, and then the image characteristics of the electostatic lense are investigated using the Raytrace method. (orig./LH) [de

  9. Opencast mining and environmental restoration; Explotacion minera a cielo abierto y restauracion ambiental

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-07-01

    The great advance in recent years of earthmoving equipment has enabled the development in opencast mining of an exploitation technique which permits the extraction of coal directly from the upper surface, by means of large excavations. Simultaneously with the mining project, a land reclamation project is being worked out with two fundamental objectives: the establishment of means of protection during the mining; and the plan for reconstruction of the ground and landscape. 7 figs.

  10. Possibility of applying mechanized coal mining in the mine 'Soko', with the comparative advantages of production results and impact

    Directory of Open Access Journals (Sweden)

    Denić Miodrag

    2014-01-01

    Full Text Available Mining method applied in the RMU 'Soko', is repeatedly technologically modified and reached the maximum limit in terms of productivity, level of job performance and safety at work. And all the other methods, which are in the technological process of obtaining coal rely on the technology of drilling-blasting works, in terms of the mine 'Soko', can not allow mass production of coal, regarding natural and technical-technological conditions prevailing in Sokobanja coal basin. Therefore, this paper proposes a possible solution which would enable a significant increase in annual production by appling mechanized coal mining system.

  11. Technology Transfer at Edgar Mine: Phase 1; October 2016

    Energy Technology Data Exchange (ETDEWEB)

    Augustine, Chad R. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Bauer, Stephen [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Nakagawa, Masami [Colorado School of Mines, Golden, CO (United States); Zhou, Wendy [Colorado School of Mines, Golden, CO (United States)

    2017-09-14

    The objective of this project is to study the flow of fluid through the fractures and to characterize the efficiency of heat extraction (heat transfer) from the test rock mass in the Edgar Mine, managed by Colorado School of Mines in Idaho Springs, CO. The experiment consists of drilling into the wall of the mine and fracturing the rock, characterizing the size and nature of the fracture network, circulating fluid through the network, and measuring the efficiency of heat extraction from the 'reservoir' by monitoring the temperature of the 'produced' fluid with time. This is a multi-year project performed as a collaboration between the National Renewable Energy Laboratory, Colorado School of Mines and Sandia National Laboratories and carried out in phases. This report summarizes Phase 1: Selection and characterization of the location for the experiment, and outlines the steps for Phase 2: Circulation Experiments.

  12. Recomposing mined lands: Landscape as arena for education

    International Nuclear Information System (INIS)

    Wessman, S.

    1998-01-01

    This project is an hypothetical design using landscape architectural principles and processes for land use in the near distant future. The site is the Powell River Project 1,700 acres of surface-mined coal country in southwestern Virginia. In this design, the author challenges the boundaries of normative reclamation and makes a case for using landscape architectural planning and design in reclamation decisions. The power of design is that it integrates the technical with the cultural and enables wider consideration for post-mining uses. The author's theses is that landscape can be the best teacher and influence of people's attitudes about their environment history and cultural conditions. To make informed decisions, a populace must understand these issues. In the design the Powell River Project landscape is a system composed of interrelated parts; actively mined areas, reclaimed areas (pre- and post- 1997), the nascent Education Center within the Project, the Powell River watershed, and nearby towns. This whole extends well beyond the Project's bounds out into the Appalachian region of Virginia's southwestern counties. The project design recomposes the parts in a way that considers both near-term uses and long-term economic growth potential. Phase 1 is a clearly defined and strengthened Education center and expansion of the Center's regional presence. Phase 2 is the development of the Norton-Wise-Powell River Project Triangle into a focus of regional cultural, economic and environmental affairs

  13. Health in mines

    Energy Technology Data Exchange (ETDEWEB)

    Breuer, H

    1978-01-01

    This report summarizes the information gained from research carried out under the five-year programme (1971-1976) relating to health in mines. This programme concentrates on technical means of dust control, and the various aspects of this topic are reviewed. The purpose of the epidemiology of pneumoconiosis is to determine the origin and development of this endemic disease with a view to formulating a policy of worker protection. The constituents of dust and their possible influences are studied. Measuring and determining the characteristics of dusts are the subject of the second group of research projects. Prevention techniques have been proposed, tried out and developed, thus providing the mining industry with a set of dust control methods. water infusion, dedusting on coal-getting and heading machines, control of dust produced by caving, etc. A chapter devoted to iron ore mines discusses means of protection against noxious emissions from Diesel engines and explosives. (Editions available in English, in German, in French, in Italian, and in Dutch)

  14. Treat mine water using passive methods

    International Nuclear Information System (INIS)

    Kleinmann, R.L.P.; Hedin, R.S.

    1993-01-01

    Passive treatment represents an alternative to conventional chemical treatment of coal mine drainage. When successful, passive systems require less investment, less maintenance and usually are less expensive than conventional chemical treatment systems. As a result, during the last seven years, more than 500 passive systems have been constructed in the United States to treat coal mine drainage. Some exist as an alternative to conventional treatment; others serve as an inexpensive pretreatment step than can decrease subsequent chemical requirements. Sulfide minerals present in rock disturbed during mining can oxidize to form an acidic metal-laden solution, commonly known as acid mine drainage (AMD). Alkalinity present in the rock may partially or completely neutralize AMD, but if either acidity or excessive metal contaminants remain, the water must be treated before it can be discharged legally. The principal regulated contaminant metals of coal mine drainage are iron and manganese. Metal mine drainage often contains more toxic metals, such as cadmium, nickel, copper and zinc. Chemical treatment of AMD is estimated to cost America's mining industry more than $1 million a day. Three principal passive technologies are used in the treatment of coal mine drainage: Aerobic wetlands, wetlands constructed with an organic substrate and anoxic limestone drains (ALDS). The selection of the technology or combination of technologies to be used depends on the quality of the water being treated

  15. Investigations of Heat Recovery in Different Refrigeration System Solutions in Supermarkets. Effsys2 project final report

    Energy Technology Data Exchange (ETDEWEB)

    Sawalha, Same; Chen, Yang

    2010-07-01

    Supermarkets are intensive energy consumers with constantly increasing number of installations. About 50 % of the energy consumption in the supermarket is absorbed by the refrigeration system to cover the cooling demands. Simultaneously, heating is needed in the supermarket where the rejected heat from the refrigeration system is usually higher than the needs. It is an interesting possibility to utilize the rejected heat from the refrigeration system to cover the heating needs in supermarkets. The objective of this project is to investigate the heat recovery performance of the new refrigeration system solutions in supermarket applications. The focus is on environmentally friendly systems with natural working fluids, mainly CO{sub 2} trans-critical systems. The project analyzes the temperature levels and capacities of rejected heat from different system solutions and investigates its matching with the heating needs in supermarkets. Using simulation tools this project also aims at defining the system solution/s which has good energy efficiency for simultaneous cooling and heat recovery.

  16. Intelligent Information Retrieval and Web Mining Architecture Using SOA

    Science.gov (United States)

    El-Bathy, Naser Ibrahim

    2010-01-01

    The study of this dissertation provides a solution to a very specific problem instance in the area of data mining, data warehousing, and service-oriented architecture in publishing and newspaper industries. The research question focuses on the integration of data mining and data warehousing. The research problem focuses on the development of…

  17. CONCEPTION OF THE TRACK SYSTEM FOR „DĘBIEŃSKO 1” MINING PLANT

    Directory of Open Access Journals (Sweden)

    Ryszard MIELIMĄKA

    2016-07-01

    Full Text Available This article presents two concepts of site development for the „Dębieńsko 1” mining plant including plans for the track system. The first plan was created in 2013 year and mainly assumed the renovation of railway infrastructure, without changing its shape and configuration. In 2014 year it was resigned from realization of the first conception and there was proposed the second plan. It included changes in the existing track system and project of the new system of excavated raw material haulage. This system is successfully using in the USA and provides the better work productivity of a shunting locomotive. In this article also were indicated the advantages and the disadvantages of solutions proposed in the two projects of site development plans. It was denoted the project that has ultimately been chosen with the justification of choice.

  18. The importance of mines for ultimate storage at Deilmann-Haniel Shaft Sinking

    International Nuclear Information System (INIS)

    Greinacher, Jochen; Oellers, Thomas; Ahlbrecht, Thomas

    2011-01-01

    Deilmann-Haniel Shaft Sinking GmbH and its predecessor and associate companies have been involved in projects for underground ultimate storage in Germany, Europe and America for over 45 years. The field of activities previously comprised surveying, planning and sinking of shafts, repair and conversion work, design of underground sealing structures, planning of conveyors and support of the BfS in planning approval procedures. Following discontinuation of activities in the German coal mining industry the use of mines for ultimate storage is an important support for German specialist mining companies. The use of mines for ultimate storage ensures that the existing mining know how in Germany is maintained, because training of the younger generation on the commercial and engineering side of the companies is made possible by the imminent major projects.

  19. Organization of radiation inspection for strip-mining development for ores with elevated content of natural radionuclides on the Karazhyra coal mine

    International Nuclear Information System (INIS)

    Lukashenko, S.N.; Subbotin, S.B.; Ajdarkhanov, A.O.; Medvedev, P.P.

    2003-01-01

    Due to existence of anomalous areas of ores with elevated content of natural radionuclides on the Karazhyra coal mine the project of its selective development was implemented. The project provides a set of measures on radiation safety. In the present paper the order of radiological operations organization and performance are shown, and methodical provision of these works is considered. Results of the preliminary radiological examination of the area, fulfilment the measures on mine works technology radiological safety, and strip-mining ores deposition are analyzed. The evaluations of natural radionuclides content with taking into account its influence on personnel during works fulfilment are made. The results of soil samples analysis are presented in the graphical form. The suggestions and recommendations on radiation monitoring improvement on the area are given

  20. Remediation of the Lermontov mining site in Russia

    International Nuclear Information System (INIS)

    Krotkov, V.V.

    2001-01-01

    For 40 years, uranium mines were operated in the direct vicinity of the spas of Mineralnyje Wody, Pjatigorsk, Kislowodsk, Jessentuki and Zheleznowodsk by the Almaz company. Now that the mines have been abandoned, the spa region is surrounded by contaminated land. Remedial measures are projected in accordance with radiation protection standards [de

  1. A novel approach to imaging extinct seafloor massive sulphides (eSMS) by using ocean bottom seismometer data from the Blue Mining project

    Science.gov (United States)

    Gil, A.; Chidlow, K. L.; Vardy, M. E.; Bialas, J.; Schroeder, H.; Stobbs, I. J.; Gehrmann, R. A. S.; North, L. J.; Minshull, T. A.; Petersen, S.; Murton, B. J.

    2017-12-01

    Seafloor massive sulphide (SMS) deposits have generated great interest regarding their formation and composition, since their discovery in 1977. SMS deposits form through hydrothermal circulation and are therefore commonly found near hydrothermal vent sites. The high base (Cu, Zn) and precious metal (Au, Ag) content has interested mining companies, due to their potentially high economic value. Currently, the possibility of mining extinct seafloor massive sulphides (eSMS) deposits has opened a debate about their environmentally and economically sustainable exploitation. A major goal is the rapid exploration and assessment of deposit structure and volume. This is challenging due to their small dimensions (100s m diameter) and typically great water depths (> 3000 mbsl). Here we present a novel approach combining seismic reflection/refraction forward modelling to data acquired from the TAG hydrothermal field (26ºN, Mid-Atlantic Ridge, 3500mbsl) to image deep-water eSMS deposits. In May 2016, the RV METEOR shot 30, short (Mining' project, n˚ 604500.

  2. Analysis on the choice of the most suitable metal prices in a mining investment project; Analisis sobre la eleccion del precio mas adecuado de los metales en un proyecto minero de inversion

    Energy Technology Data Exchange (ETDEWEB)

    Torre, L. de la; Espi, J. a.

    2014-07-01

    The mineral price assigned in mining project design is critical to determining the economic feasibility of a project. Nevertheless, although it is not difficult to find literature about market metal prices, it is much more complicated to achieve a specific methodology for calculating the value or which justifications are appropriate to include. This study presents an analysis of various methods for selecting metal prices and investigates the mechanisms and motives underlying price selections. The results describe various attitudes adopted by the designers of mining investment project, and how the price can be determined not just by means of forecasting also by consideration of other relevant parameters. (Author)

  3. Mine drivage in hydraulic mines

    Energy Technology Data Exchange (ETDEWEB)

    Ehkber, B Ya

    1983-09-01

    From 20 to 25% of labor cost in hydraulic coal mines falls on mine drivage. Range of mine drivage is high due to the large number of shortwalls mined by hydraulic monitors. Reducing mining cost in hydraulic mines depends on lowering drivage cost by use of new drivage systems or by increasing efficiency of drivage systems used at present. The following drivage methods used in hydraulic mines are compared: heading machines with hydraulic haulage of cut rocks and coal, hydraulic monitors with hydraulic haulage, drilling and blasting with hydraulic haulage of blasted rocks. Mining and geologic conditions which influence selection of the optimum mine drivage system are analyzed. Standardized cross sections of mine roadways driven by the 3 methods are shown in schemes. Support systems used in mine roadways are compared: timber supports, roof bolts, roof bolts with steel elements, and roadways driven in rocks without a support system. Heading machines (K-56MG, GPKG, 4PU, PK-3M) and hydraulic monitors (GMDTs-3M, 12GD-2) used for mine drivage are described. Data on mine drivage in hydraulic coal mines in the Kuzbass are discussed. From 40 to 46% of roadways are driven by heading machines with hydraulic haulage and from 12 to 15% by hydraulic monitors with hydraulic haulage.

  4. Determination of granite rock massif weathering and cracking of surface layers in the oldest parts of medieval mine depending on used mining method

    Czech Academy of Sciences Publication Activity Database

    Lednická, Markéta; Kaláb, Zdeněk

    2016-01-01

    Roč. 61, č. 2 (2016), s. 381-395 ISSN 0860-7001 R&D Projects: GA MŠk(CZ) LO1406; GA MŠk ED2.1.00/03.0082 Institutional support: RVO:68145535 Keywords : Jeroným Mine * non-destructive testing * granite Subject RIV: DH - Mining, incl. Coal Mining Impact factor: 0.550, year: 2016 http://archiwum.img-pan.krakow.pl/index.php/AMS/article/view/785/692

  5. Natural resources sustainability: iron ore mining

    International Nuclear Information System (INIS)

    De La Torre de Palacios, Luis

    2011-01-01

    In the present article, a new tool to determine environmental sustainability, the energy impact index (EII) was developed to classify different iron mine projects according to two main parameters including energy consumption and CO 2 emissions. The EII considers the characteristics of the mineral (such as the quality, size, hardness, iron ore grade, reducibility, mineral/waste rate, and type of deposit), mining processes (type of exploitation, ore processing, available technology), and transportation (distance to cover).

  6. Implementation of a change management solution based on a product lifecycle management system for a large international project

    International Nuclear Information System (INIS)

    Luehr, Anneke

    2011-08-01

    This Thesis describes the implementation of a Change Management solution based on a Product Lifecycle Management System (PLM System) for a large international project. The objective of Change Management is to ensure a systematic line of action for approving and implementing changes in the project. The Deutsches Elektronen-Synchrotron DESY is one of the world's leading accelerator centres with locations in Hamburg and Zeuthen. Currently, DESY participates in the realization of the international research facility European X-Ray Free-Electron Laser (XFEL) at the Hamburg site. DESY was responsible for the planning of the XFEL. When the project entered the construction phase it was internationalized and now comprises project groups in 12 countries. Thus the requirements on Change Management have changed, as participants from several labs at many different locations are now involved. First the project scope is described and then a target process for the Change Management solution is developed by a requirement analysis. Afterwards the technical implementation of this process in DESY's PLM System is described and the Change Management solution is tested. The process is visualized using the Unified Modeling Language (UML). Finally a description is given of how to transfer the solution to the project

  7. Projects development for mining-metallurgical units for production of uranium concentrates. An analysis an a methodology

    International Nuclear Information System (INIS)

    Ajuria G, S.; Blanco P, B.; Manzanera Q, C.; Pena A, J.

    1978-07-01

    An analysis and a methodology for the complete development of a mining- metallurgist project is presented, from the sampling and the evaluation of a deposit until the outburst of a metallurgical plant. The main objectives of this work are three: On one hand it is to establish a methodology for standardize the internal activities of the Sub management of Benefits. It is convenient standardize the experimental procedures, the evaluation approaches and the form of presentation of results so that they are directly comparable and that it is easy their interpretation and use. Given the nature so variable of the minerals this document cannot be but that a guide and it is indispensable that in all moment the personnel that develops these activities uses his knowledge, experience and professional approach to obtain the best results. On the other hand it is to establish a base to facilitate the coordination of the activities of the Sub management of Benefit with other work groups, inside of and outside of the INEN that should collaborate in the projects. Finally it is to present a vision of group of the whole project like reference base for the participant personnel. Many of the specialists that contribute to the project would not be metallurgists, but rather they practice other disciplines. It is therefore convenient to facilitate the one that are formed an image of the complete project. (Author)

  8. Standard values of quality and ore mining costs in management of multi-plant mining company

    Energy Technology Data Exchange (ETDEWEB)

    Kudelko, Jan [KGHM CUPRUM Research and Development Center, Wroclaw (Poland); Wirth, Herbert [KGHM Polska Miedz S.A., Lubin (Poland)

    2010-03-15

    Profitability of copper deposit mining depends on three basic variables, electrolytic copper price, manufacturing and selling costs of copper and company property involved in production process. If the company property is adjusted to its tasks then the mining profiability depends on costs of copper mining and selling, because the price is the external variable defined by the market. We can shape the costs in two (complementary) ways, traditionally, reducing the labor, material and power consumption, and by adjusting the quality of mined ore (copper content) to the level required by the current copper prices. Required quality of copper ore in the whole company we determine according to the accepted profitability criteria and then we determine quality standard for individual mines. Algorithms determining the ore quality standard resulting from current market price of copper are presented in the paper. Calculation models for the mined ore quality standards, unit mining costs per one ton of copper, electrolytic copper production and ore output are given. Standards were established for one variable assuming that the other variables are determined in this calculation. Innovative solution, presented in the paper, is the method of decomposition of the company controllable variables into the tasks for individual mines providing reaching the targets to the whole technological circuit. Using the models, having relatively few data, it will be possible to calculate quickly the values which are interesting for managers such as for example the prognosis of rate of return (economic or operational), required copper content in the mined ore for the whole company and individual mines at given rate of return or boundary level of copper content in comparison with cost and production level. Examples of calculation are provided. (orig.)

  9. World Wide Web Usage Mining Systems and Technologies

    Directory of Open Access Journals (Sweden)

    Wen-Chen Hu

    2003-08-01

    Full Text Available Web usage mining is used to discover interesting user navigation patterns and can be applied to many real-world problems, such as improving Web sites/pages, making additional topic or product recommendations, user/customer behavior studies, etc. This article provides a survey and analysis of current Web usage mining systems and technologies. A Web usage mining system performs five major tasks: i data gathering, ii data preparation, iii navigation pattern discovery, iv pattern analysis and visualization, and v pattern applications. Each task is explained in detail and its related technologies are introduced. A list of major research systems and projects concerning Web usage mining is also presented, and a summary of Web usage mining is given in the last section.

  10. Review of completed SIMRAC projects at CSIR division of mining technology 1993-1995.

    CSIR Research Space (South Africa)

    Gay, NC

    1997-06-01

    Full Text Available This report was commissioned to assess the improvement of the wellbeing of workers in the mining industry and also verify, if the research findings are successfully implemented in the mines...

  11. Responsible Development of Areva's Mining Activities. Report 2011

    International Nuclear Information System (INIS)

    2012-09-01

    After a presentation of the approach to responsibility adopted by AREVA to be a responsible mining stake holder (charter of values, implemented policies, risk prevention and management, best practices), this report gives an overview of mining activities (international presence, production in constant increase) with a focus on uranium mining which is the core business (the different phases are briefly presented: exploration, project development, mining, site decommissioning). It outlines personnel qualification and commitment, actions and policy in the field of personnel health and safety. It addresses the environmental policy: key levers, environmental management system, examples throughout the entire mining life cycle, changes in site consumptions and emissions, promotion of biodiversity. The next part concerns Areva's social commitment (dialogue, development aid in mining territories). Then, performance is expressed in terms of indicators for these different issues (teams, environmental policy, social involvement)

  12. A node linkage approach for sequential pattern mining.

    Directory of Open Access Journals (Sweden)

    Osvaldo Navarro

    Full Text Available Sequential Pattern Mining is a widely addressed problem in data mining, with applications such as analyzing Web usage, examining purchase behavior, and text mining, among others. Nevertheless, with the dramatic increase in data volume, the current approaches prove inefficient when dealing with large input datasets, a large number of different symbols and low minimum supports. In this paper, we propose a new sequential pattern mining algorithm, which follows a pattern-growth scheme to discover sequential patterns. Unlike most pattern growth algorithms, our approach does not build a data structure to represent the input dataset, but instead accesses the required sequences through pseudo-projection databases, achieving better runtime and reducing memory requirements. Our algorithm traverses the search space in a depth-first fashion and only preserves in memory a pattern node linkage and the pseudo-projections required for the branch being explored at the time. Experimental results show that our new approach, the Node Linkage Depth-First Traversal algorithm (NLDFT, has better performance and scalability in comparison with state of the art algorithms.

  13. The McClean Lake uranium project

    International Nuclear Information System (INIS)

    Blaise, J.R.

    2001-01-01

    The McClean Lake Uranium Project, located in the northern part of Saskatchewan, consists of five uranium deposits, Jeb - Sue A - Sue B - Sue C - McClean, scattered in three different locations on the mineral lease. On 16 March 1995, COGEMA Resources Inc and its partners, Denison Mines Ltd and OURD (Canada) Co Ltd, made the formal decision to develop the McClean Lake Project. Construction of the mine and mill started during summer 1995 and should be finished by mid 1997. Mining of the first deposit, Jeb started in 1996, ore being currently mined. The start of the yellowcake production is scheduled to start this fall. (author)

  14. The effects of acidic mine drainage from historical mines in the Animas River watershed, San Juan County, Colorado—What is being done and what can be done to improve water quality?

    Science.gov (United States)

    Church, Stanley E.; Owen, Robert J.; Von Guerard, Paul; Verplanck, Philip L.; Kimball, Briant A.; Yager, Douglas B.

    2007-01-01

    Historical production of metals in the western United States has left a legacy of acidic drainage and toxic metals in many mountain watersheds that are a potential threat to human and ecosystem health. Studies of the effects of historical mining on surface water chemistry and riparian habitat in the Animas River watershed have shown that cost-effective remediation of mine sites must be carefully planned. of the more than 5400 mine, mill, and prospect sites in the watershed, ∼80 sites account for more than 90% of the metal loads to the surface drainages. Much of the low pH water and some of the metal loads are the result of weathering of hydrothermally altered rock that has not been disturbed by historical mining. Some stream reaches in areas underlain by hydrothermally altered rock contained no aquatic life prior to mining.Scientific studies of the processes and metal-release pathways are necessary to develop effective remediation strategies, particularly in watersheds where there is little land available to build mine-waste repositories. Characterization of mine waste, development of runoff profiles, and evaluation of ground-water pathways all require rigorous study and are expensive upfront costs that land managers find difficult to justify. Tracer studies of water quality provide a detailed spatial analysis of processes affecting surface- and ground-water chemistry. Reactive transport models were used in conjunction with the best state-of-the-art engineering solutions to make informed and cost-effective remediation decisions.Remediation of 23% of the high-priority sites identified in the watershed has resulted in steady improvement in water quality. More than $12 million, most contributed by private entities, has been spent on remediation in the Animas River watershed. The recovery curve for aquatic life in the Animas River system will require further documentation and long-term monitoring to evaluate the effectiveness of remediation projects implemented.

  15. The SOLUTIONS project : Challenges and responses for present and future emerging pollutants in land and water resources management

    NARCIS (Netherlands)

    Brack, Werner; Altenburger, Rolf; Schüürmann, Gerrit; Krauss, Martin; López Herráez, David; van Gils, Jos; Slobodnik, Jaroslav; Munthe, John; Gawlik, Bernd Manfred; van Wezel, Annemarie|info:eu-repo/dai/nl/141376074; Schriks, Merijn; Hollender, Juliane; Tollefsen, Knut Erik; Mekenyan, Ovanes; Dimitrov, Saby; Bunke, Dirk; Cousins, Ian; Posthuma, Leo; van den Brink, Paul J.; López de Alda, Miren; Barceló, Damià; Faust, Michael; Kortenkamp, Andreas; Scrimshaw, Mark; Ignatova, Svetlana; Engelen, Guy; Massmann, Gudrun; Lemkine, Gregory; Teodorovic, Ivana; Walz, Karl Heinz; Dulio, Valeria; Jonker, Michiel T O|info:eu-repo/dai/nl/175518793; Jäger, Felix; Chipman, Kevin; Falciani, Francesco; Liska, Igor; Rooke, David; Zhang, Xiaowei; Hollert, Henner; Vrana, Branislav; Hilscherova, Klara; Kramer, Kees; Neumann, Steffen; Hammerbacher, Ruth; Backhaus, Thomas; Mack, Juliane; Segner, Helmut; Escher, Beate; de Aragão Umbuzeiro, Gisela

    2015-01-01

    SOLUTIONS (2013 to 2018) is a European Union Seventh Framework Programme Project (EU-FP7). The project aims to deliver a conceptual framework to support the evidence-based development of environmental policies with regard to water quality. SOLUTIONS will develop the tools for the identification,

  16. The SOLUTIONS project: Challenges and responses for present and future emerging pollutants in land and water resources management

    NARCIS (Netherlands)

    Brack, W.; Altenburger, R.; Schuurmann, G.; Krauss, M.; Brink, van den P.J.

    2015-01-01

    SOLUTIONS (2013 to 2018) is a European Union Seventh Framework Programme Project (EU-FP7). The project aims to deliver a conceptual framework to support the evidence-based development of environmental policies with regard to water quality. SOLUTIONS will develop the tools for the identification,

  17. Uranium mining and heap leaching in India and related safety measures - A case study of Jajawal mines

    International Nuclear Information System (INIS)

    Saxena, V.P.; Verma, S.C.

    2001-01-01

    Exploration and exploitation of uranium involves drilling, mining, milling and extraction processes including heap leaching in some cases. At the exploration stage, the country's laws related to statutory environmental clearance covering forest and sanctuaries or Coastal Regulatory Zones (CRZ) are equally applicable for atomic minerals. At the developmental mining or commercial exploitation stage in addition to the environmental impact assessment, the provisions of Atomic Energy (working of Mines, Minerals and handling of Prescribed Substances) Rules 1984 are also to be followed which covers radiation monitoring, pollution control and other safety measures which are enforced by licensing authorities and the Atomic Energy Regulatory Board (AERB) of India. In India, Jaduguda, Bhatin, Narwapahar in Singhbhum Thrust Belt (STB), Asthota and Khiya in Siwaliks, Domiasiat in Cretaceous sandstones, Bodal and Jajawal in Precambrian crystallines, are some of the centres where mining has been carried out up to various underground levels. Substantial amount of dust and radon gas are generated during mining and milling operations. Though uranium mining is considered as hazardous for contamination by radionuclides, it is observed that many non-uranium mines have registered up to 100 mWL radon concentration, e.g. copper mines in STB area show up to 900 mewl in a few cases. Compared to this the Uranium mines in India have not shown any increase over the limits prescribed by AERB. Specific problems associated with mining include release of radon and other radioactive pollutants like Th-230, Ra-226, Pb-210 and Po-210, substantial dust generation, ground water contamination, proximity of population to working mines and environmental surveillance. These problems are adequately handled by periodical monitoring of various radiological parameters such as radon daughter working level, long lived alpha activity and concentration of radionuclides in gaseous, liquid and solid medium. Pre-project

  18. Analysis on safety production in coal mines Henan Province

    Institute of Scientific and Technical Information of China (English)

    KONG Liu-an; ZHANG Wen-yong

    2006-01-01

    Based on the rigorous situation of safety production in coal mines, the paper analyzed the statistical data of recent accidents indexes in Henan's coal mines. Using investigation and comparison analysis methods, a specified analysis on mining conditions, technical facility level, safety input and vocational quality of workers in Henan's coal mines was conducted. The result indicates that there have been existing such main safety production problems as weak safety management, low-level facilities, inadequate safety input and poor vocational quality and so on. Finally it proposes such reference solutions as to establish and perfect coal mining supervision and management system, to increase safety investment into techniques and facilities and to strengthen workers' safety education and introduction of more high-level professional talents.

  19. New force or model-dependent effect in the mine gravity measurements?

    International Nuclear Information System (INIS)

    Kim, Y.E.; Klepacki, D.J.; Hinze, W.J.

    1987-01-01

    The exact solution for the oblate spheroidal layer model of the earth is applied to recent gravity data measured at the Hilton mine, Mount Isa, Queensland. We find that our extracted values of the gravitational constant from the Hilton mine data are consistent with the laboratory value within the accuracy of the mass density profile determination made at the Hilton mine and the surrounding area. (orig.)

  20. Translation of environmental leadership objectives into routine project execution for the uranium mining industry

    International Nuclear Information System (INIS)

    Breker, J.; Studer, T.; Voykin, N.; Berg, B.; Scott, W.

    2010-01-01

    Cameco Corporation (Cameco) aligns its social and environmental responsibilities with its vision, mission and values. Environmental Leadership is established as a corporate objective that emphasizes the triple-bottom-line and a systematic approach to understanding environmental, social and economic issues, risks and opportunities. These are ingrained in the project culture, systems and processes and used to influence solutions derived by the project teams to achieve Cameco's objectives. This paper traces the organizational objectives from the early stages of a project through to implementation and turn over to Operations. A case study is used to demonstrate how an asset is influenced by Cameco's strategy. (author)

  1. Translation of environmental leadership objectives into routine project execution for the uranium mining industry

    Energy Technology Data Exchange (ETDEWEB)

    Breker, J.; Studer, T.; Voykin, N.; Berg, B., E-mail: jeremy_breker@cameco.com [Cameco Corp., Saskatoon, SK (Canada); Scott, W. [Wardrop Engineering, Thunder Bay, ON (Canada)

    2010-07-01

    Cameco Corporation (Cameco) aligns its social and environmental responsibilities with its vision, mission and values. Environmental Leadership is established as a corporate objective that emphasizes the triple-bottom-line and a systematic approach to understanding environmental, social and economic issues, risks and opportunities. These are ingrained in the project culture, systems and processes and used to influence solutions derived by the project teams to achieve Cameco's objectives. This paper traces the organizational objectives from the early stages of a project through to implementation and turn over to Operations. A case study is used to demonstrate how an asset is influenced by Cameco's strategy. (author)

  2. NEDO coal mining structure adjustment subcommittee. 18th project report meeting; NEDO sekitan kogyo kozo chosei bunkakai. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    Concerning the subject matter, a NEDO (New Energy and Industrial Technology Development Organization) director Keishiro Kawamo reports on NEDO's projects designed to smoothly implement the 'new coal policy'. Nobuaki Terasaka, chief of the planning division, coal and new energy department, Agency of Natural Resources and Energy, takes up the current status of the coal policy and the tasks it faces, and discusses, predicting the development of the coal policy, the assurance of stable supply of coal from abroad, development of clean coal technologies that will rightly deal with the world-wide environmental problems, and the international diffusion of the clean coal technologies and the completion of the basement therefor. Concerning the 'development of zeolite-related commodities,' a report is delivered on the manufacture of a soil improving material and a deodorant for fish grill from zeolite found rich in coal layers of Pacific Coal Mine Co., Ltd. Concerning the 'polycrystalline diamond manufacturing project,' a polycrystalline diamond synthesizing method making use of the blasting technique employed at coal mines is reported. (NEDO)

  3. Lowering resistance of the Hoyle Pond Mine

    Energy Technology Data Exchange (ETDEWEB)

    Desjardins, M. [Goldcorp Canada Ltd., Porcupine Gold Mines, Hoyle Pond Mine, Timmins, ON (Canada)

    2010-07-01

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, east of Timmins, Ontario. Various mining methods are used to excavate the gold, each with different ventilation requirements in terms of layout and volume. The mine was originally designed as a shallow mine but is planning to reach a depth of 2500 m. This paper described the events that lead to the high system pressures encountered at the mine, and the measures taken to reduce them. New surface fans and a new fresh air raise (FAR) were commissioned in 2005. The old FAR had to be sealed as soon as the new fans were in place in order to prevent short-circuiting. As a result, the mine resistance curve steepened considerably. The total pressure at the fan increased from 1500 Pa to 3000 Pa. As such, only 1 surface fan could operate at any give time, providing only half the possible volume of air. The challenge was to reduce the mine's resistance while getting the desired volume of air down to to the mining faces at depth. The solutions were to install booster fans and initiate a raise-bore program that would link the 450 m level to 900 m level. These measures twinned the existing fresh air circuit and resulted in a lowering of the overall mine resistance curve. 1 ref., 9 figs.

  4. Research on the prevention of mine accident

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Won Jai; Kang, Chang Hee; Lee, Sang Kwon; Lee, Jong Lim; Kim, Chung Han; Hong, Sung Gyu [Korea Inst. of Geology Mining and Materials, Taejon (Korea, Republic of)

    1995-12-01

    This research is for providing appropriate measures on mine safety and long term development base of the operating mines by over whole safety inspections. In this first project year, Jongam mine owned by Samtan Co. Ltd. and Hwasun mine of Daihan Coal Corporation were target for this research. Major issue of Jongam mine was revealed that lack of pumping capacity to treat ever increasing underground water which is mainly due to the inflow from the adjacent closed mines, and insufficient investment for the preparation of long term program. In case of Hwasun mine, the major problems are the surface subsidence and water inflow caused by extraction of large scale pocket type ore body. Besides, in most cases, the morale of mine workers and business mind of owners are so depressed that the mine safety is going to be vulnerable anyhow. In this point of view, the regulatory and systematic measures to encourage the workers` morale and owners` investment mind are urgently requested. However, investigation result of underground electrical hazard showed that there is no remarkable problems. The average efficiency of pumps revealed 50% which is considered rather good condition yet, and no coal seams were found which bears excessive carbon dioxide gas. (author). 21 refs., 40 figs., 81 tabs.

  5. Design characteristics of the Belchatow brown coal mine in light of achievements of the Poltegor center

    Energy Technology Data Exchange (ETDEWEB)

    Kozlowski, Z [Akademia Gorniczo-Hutnicza, Cracow (Poland)

    1988-01-01

    Discusses development of the Belchatow mine design by the Poltegor center in Wroclaw (coordinator of the project). Research units in Wroclaw (University and Technical University), Gliwice (Silesian Technical University), Cracow (Academy of Mining and Metallurgy) also participated in the project. The following stages of coal exploration and planning of surface mining at Belchatow are discussed: evaluation of mining and geologic conditions, assessment of coal reserves and calorific value, selecting optimum scheme for deposit opening, planning development of the Belchatow district, design of bucket wheel excavators, belt conveyor systems and stackers, development of heavy-duty mining equipment for the largest and deepest surface mine in Poland, design development of auxiliary installations, planning earthmoving operations. Selected specific problems associated with the Belchatow mine solved by Poltegor are discussed: seismic shocks, mine draining, landslide hazards.

  6. Mining and environment

    International Nuclear Information System (INIS)

    Pimiento, Elkin Vargas

    1998-01-01

    In order to obtain the best social and environmental results from mining activities, different solutions, which involve a variety of perspectives, have been proposed. These include the worldwide perspective based in the economy globalization paradigms; the regional perspective, focused in the integration of countries; the national perspective, which emphasizes the natural assets and development options, and finally a local perspective is incorporated to account for the participation of directly affected communities. Within this framework, the mining industry is requested to develop both technological and managerial tools appropriate to evaluate, optimize and communicate the social and environmental performance and output of its related activities, mainly in the developing countries. On the other hand, the governments have been committed to implement regulatory actions, of command and control type, based on an environmental legislation in line with the above mentioned perspectives and also to use economical instruments as a mean to accomplish environmental objectives. In Colombia the direct regulation methods have been traditionally used to prevent the environmental deterioration produced by mining activities, however, since the 1991 political constitution and the law 99 of 1993, the communities' participation and economical instruments were incorporated. A historic summary of the environmental legislation in our country from the early 70's up to now, showing its implications in mining is presented. Then a favorable tendency is indicated in the environmental improvement of the national extractive industry, accomplished as a result of the implementation of new strategies to minimize the impact of mining on the environment and to improve the well being of local communities

  7. Mine games

    Energy Technology Data Exchange (ETDEWEB)

    Patchett, A. [Hitachi Construction Equipment (United Kingdom)

    2006-09-15

    The article describes various excavators used in the UK by Hall Construction for coal mining and reclamation projects. They include machines from Hitachi Construction Machinery that have been modified with a coal shovel at the front end. The ZX350LC-3, for example incorporates a coal shovel, manufactured by Kocurek, to allow it to work at the rock face and lift coal into road wagons or dump trucks. 5 figs.

  8. Data mining concepts, methods and applications in management and engineering design

    CERN Document Server

    Yin, Yong; Tang, Jiafu; Zhu, JianMing

    2011-01-01

    Data Mining introduces in clear and simple ways how to use existing data mining methods to obtain effective solutions for a variety of management and engineering design problems. Data Mining is organised into two parts: the first provides a focused introduction to data mining and the second goes into greater depth on subjects such as customer analysis. It covers almost all managerial activities of a company, including: * supply chain design, * product development, * manufacturing system design, * product quality control, and * preservation of privacy. Incorporating recent developments of data

  9. Landslide rehabilitation with geo synthetics in open coal mine Oslomej

    International Nuclear Information System (INIS)

    Dimitrievski, Ljupcho; Ilievska, Frosina; Ilievski, Darko

    2004-01-01

    In November 2002 stability is violated and landslides are registered in open coal mine Oslomej, Republic of Macedonia. Around the profile IV existing open irrigation channel was interrupted and landslide was extended to the regional way R421 Kicevo - Oslomej. The landslide was classified like big and dangerous, including danger for disruption of the regional road and pipeline Studencica - Oslomej for supplying of thermal power plant Oslomej with technical water. According to the proposed solution, main project design for landslide rehabilitation was prepared with using geo synthetics Stabilenka 200/45. In fill is local soil material which had been placed and compacted in layers, it had formed a composite construction. Stabilenka acts as a reinforcement due to its ability to absorb tensile forces. With the design solution two retaining walls of reinforced soil and complete drainage system of geo composite materials had been constructed This paper deals with details of the design and the construction. (Author)

  10. Rehabilitation and development of environmental pollution areas: pilot project in a former uranium mining area; Sanierung und Entwicklung umweltbelasteter Raeume: Modellvorhaben in einer ehemaligen Uranbergbauregion

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, B.; Rathmann, J.; Wirth, P.; Bovet, J.; Danielzyk, R.; Dienemann, H.; Dudel, G.; Freyer, W.; Hutter, G.

    2002-07-01

    Environmental hazards are obstacles to the development of communities and regions if they occur on broad areas with different sorts of damage at the same time, like ground damage caused by mining, ground contamination and damage to forests. In industrialized countries, people become increasingly aware of such grievances, mainly concentrating attention on certain types of areas like old industrial areas, mining and conversion areas. Often general problems of areas with weak structure (weak economical value creation, poor access possibilities) are added to the environmental hazards and this is the case in the former uranium mining area around Johanngeorgenstadt in the Saxonian Erzgebirge. The autonomous strengthening of negative processes causes the people to migrate and the settlement areas start to shrink. Facing such problems, approaches offering purely technical solutions for individual cases as practised in the past by the regional structural policies quickly reach their limits. Instead, more complex solutions are needed, connecting individual projects with the development of new perspectives for the communities involved. As a result of the positive experiences in uranium mining, the area of rehabilitation and development, the states with significant environmental hazards are given the recommendation to integrate areas needing rehabilitation and development into their plans for the state and regional development. This is based on the consideration that at first problematic areas must be determined in the development plans and then the actions plans containing the formulation and implementation of the goals of rehabilitation and development must be set up. [German] Umweltschaeden bilden fuer Gemeinden und Regionen ein Entwicklungshindernis, wenn sie grossflaechig auftreten und wenn sich unterschiedliche Schadensbilder, z.B. bergbaubedingte Tagesbrueche, Bodenkontaminationen und Waldschaeden ueberlagern. In den Industriestaaten werden Missstaende dieser Art

  11. INTEGRATED ROBOT-HUMAN CONTROL IN MINING OPERATIONS

    Energy Technology Data Exchange (ETDEWEB)

    George Danko

    2005-04-01

    This report contains a detailed description of the work conducted in the first year of the project on Integrated Robot-Human Control in Mining Operations at University of Nevada, Reno. This project combines human operator control with robotic control concepts to create a hybrid control architecture, in which the strengths of each control method are combined to increase machine efficiency and reduce operator fatigue. The kinematics reconfiguration type differential control of the excavator implemented with a variety of ''software machine kinematics'' is the key feature of the project. This software re-configured excavator is more desirable to execute a given digging task. The human operator retains the master control of the main motion parameters, while the computer coordinates the repetitive movement patterns of the machine links. These repetitive movements may be selected from a pre-defined family of trajectories with different transformations. The operator can make adjustments to this pattern in real time, as needed, to accommodate rapidly-changing environmental conditions. A Bobcat{reg_sign} 435 excavator was retrofitted with electro-hydraulic control valve elements. The modular electronic control was tested and the basic valve characteristics were measured for each valve at the Robotics Laboratory at UNR. Position sensors were added to the individual joint control actuators, and the sensors were calibrated. An electronic central control system consisting of a portable computer, converters and electronic driver components was interfaced to the electro-hydraulic valves and position sensors. The machine is operational with or without the computer control system depending on whether the computer interface is on or off. In preparation for emulated mining tasks tests, typical, repetitive tool trajectories during surface mining operations were recorded at the Newmont Mining Corporation's ''Lone Tree'' mine in Nevada.

  12. Mining Pribram in science and technology. Proceedings of Session N

    International Nuclear Information System (INIS)

    1990-01-01

    The proceedings contain 50 papers of which 15 have been inputted in INIS. They concern uranium ore leaching, leaching field designing, leaching process optimization, pressure leaching in autoclaves, obtaining zirconium compounds, scandium, rhenium and other elements as by-products in uranium mining, methods of waste solution and gas processing, reclamation of mined areas, experimental studies of interaction of other ores with leaching solutions, methods of processing uranium ores with increased arsenic content, and increasing corrosion resistance of reinforced concrete structures by the action of electric current. (M.D.). 36 figs., 16 tabs., 47 refs

  13. Inertisation and mine fire simulation using computer software

    Energy Technology Data Exchange (ETDEWEB)

    Stewart Gillies; Hsin Wei Wu [Gillies Wu Mining Technology (Australia)

    2007-05-15

    Inertisation is a technique used to enhance the safety of underground coal mine areas either to avoid the potential for a combustion event or to stabilise a situation after an ignition, fire or heating. The primary objective of the study was to review coal mine inertisation in Australia, in particular, to focus on the use of the Polish mine fire simulation software 'VENTGRAPH' to gain better understanding of how inertisation (GAG, Mineshield, Nitrogen Pressure Swing Adsorption (Floxal) and Tomlinson Boiler) units interact with the complex ventilation behaviour underground during a substantial fire. Most emphasis has been given to understanding the behaviour of the GAG unit because of its high capacity output. Critical aspects targeted for examination include location of the unit for high priority fire positions, size of borehole or pipe range required, time required for inertisation output to interact with and extinguish a fire, effects of seam gases on fire behaviour with inertisation present and main fan management. The project aims to increase understanding of behaviour of mine fires in modern mine ventilation networks with the addition of inert gas streams. A second aim of the project has been to take findings from the simulation exercises and develop inertisation related modifications to the program in conjunction with the Polish program authors. Exercises based on Oaky North and Oaky No 1 mines have involved 'evaluation or auditing' of ability to deliver inert gases generated from GAG units to high priority underground fire locations. These exercises have been built around modelling of fire scenarios across the mine layouts. The fire simulation exercises at Oaky North and Oaky No 1 mines demonstrated that it is possible to efficiently evaluate possible inertisation strategies appropriate to a complex mine layout extracting a gassy seam and determine which approach strategy (if any) can be used to stabilise a mine in a timely fashion.

  14. Techniques to correct and prevent acid mine drainage: A review

    OpenAIRE

    Pozo-Antonio, Santiago; Puente-Luna, Iván; Lagüela-López, Susana; Veiga-Ríos, María

    2014-01-01

    Acid mine drainage (AMD) from mining wastes is one of the current environmental problems in the field of mining pollution that requires most action measures. This term describes the drainage generated by natural oxidation of sulfide minerals when they are exposed to the combined action of water and atmospheric oxygen. AMD is characterized by acidic effluents with a high content of sulfate and heavy metal ions in solution, which can contaminate both groundwater and surface water. Minerals resp...

  15. Performance evaluation methods and instrumentation for mine ventilation fans

    Institute of Scientific and Technical Information of China (English)

    LI Man; WANG Xue-rong

    2009-01-01

    Ventilation fans are one of the most important pieces of equipment in coal mines. Their performance plays an important role in the safety of staff and production. Given the actual requirements of coal mine production, we instituted a research project on the measurement methods of key performance parameters such as wind pressure, amount of ventilation and power. At the end a virtual instrument for mine ventilation fans performance evaluation was developed using a USB interface. The practical perform-ance and analytical results of our experiments show that it is feasible, reliable and effective to use the proposed instrumentation for mine ventilation performance evaluation.

  16. The Bitcoin Mining Game

    Directory of Open Access Journals (Sweden)

    Nicolas Houy

    2016-12-01

    Full Text Available This article deals with the mining incentives in the Bitcoin protocol. The mining process is used to confirm and secure transactions. This process is organized as a speed game between individuals or firms – the miners – with different computational powers to solve a mathematical problem, bring a proof of work, spread their solution and reach consensus among the Bitcoin network nodes with it. First, we define and specify this game. Second, we analytically find its Nash equilibria in the two-player case. We analyze the parameters for which the miners would face the proper incentives to fulfill their function of transaction processors in the current situation. Finally, we study the block space market offer.

  17. Estimating natural background groundwater chemistry, Questa molybdenum mine, New Mexico

    Science.gov (United States)

    Verplanck, Phillip L.; Nordstrom, D. Kirk; Plumlee, Geoffrey S.; Walker, Bruce M.; Morgan, Lisa A.; Quane, Steven L.

    2010-01-01

    This 2 1/2 day field trip will present an overview of a U.S. Geological Survey (USGS) project whose objective was to estimate pre-mining groundwater chemistry at the Questa molybdenum mine, New Mexico. Because of intense debate among stakeholders regarding pre-mining groundwater chemistry standards, the New Mexico Environment Department and Chevron Mining Inc. (formerly Molycorp) agreed that the USGS should determine pre-mining groundwater quality at the site. In 2001, the USGS began a 5-year, multidisciplinary investigation to estimate pre-mining groundwater chemistry utilizing a detailed assessment of a proximal natural analog site and applied an interdisciplinary approach to infer pre-mining conditions. The trip will include a surface tour of the Questa mine and key locations in the erosion scar areas and along the Red River. The trip will provide participants with a detailed understanding of geochemical processes that influence pre-mining environmental baselines in mineralized areas and estimation techniques for determining pre-mining baseline conditions.

  18. Analysis of post-blasting source mechanisms of mining-induced seismic events in Rudna copper mine, Poland

    Directory of Open Access Journals (Sweden)

    Caputa Alicja

    2015-10-01

    Full Text Available The exploitation of georesources by underground mining can be responsible for seismic activity in areas considered aseismic. Since strong seismic events are connected with rockburst hazard, it is a continuous requirement to reduce seismic risk. One of the most effective methods to do so is blasting in potentially hazardous mining panels. In this way, small to moderate tremors are provoked and stress accumulation is substantially reduced. In this paper we present an analysis of post-blasting events using Full Moment Tensor (MT inversion at the Rudna mine, Poland, underground seismic network. In addition, we describe the problems we faced when analyzing seismic signals. Our studies show that focal mechanisms for events that occurred after blasts exhibit common features in the MT solution. The strong isotropic and small Double Couple (DC component of the MT, indicate that these events were provoked by detonations. On the other hand, post-blasting MT is considerably different than the MT obtained for strong mining events. We believe that seismological analysis of provoked and unprovoked events can be a very useful tool in confirming the effectiveness of blasting in seismic hazard reduction in mining areas.

  19. Characterization of airborne float coal dust emitted during continuous mining, longwall mining and belt transport.

    Science.gov (United States)

    Shahan, M R; Seaman, C E; Beck, T W; Colinet, J F; Mischler, S E

    2017-09-01

    Float coal dust is produced by various mining methods, carried by ventilating air and deposited on the floor, roof and ribs of mine airways. If deposited, float dust is re-entrained during a methane explosion. Without sufficient inert rock dust quantities, this float coal dust can propagate an explosion throughout mining entries. Consequently, controlling float coal dust is of critical interest to mining operations. Rock dusting, which is the adding of inert material to airway surfaces, is the main control technique currently used by the coal mining industry to reduce the float coal dust explosion hazard. To assist the industry in reducing this hazard, the Pittsburgh Mining Research Division of the U.S. National Institute for Occupational Safety and Health initiated a project to investigate methods and technologies to reduce float coal dust in underground coal mines through prevention, capture and suppression prior to deposition. Field characterization studies were performed to determine quantitatively the sources, types and amounts of dust produced during various coal mining processes. The operations chosen for study were a continuous miner section, a longwall section and a coal-handling facility. For each of these operations, the primary dust sources were confirmed to be the continuous mining machine, longwall shearer and conveyor belt transfer points, respectively. Respirable and total airborne float dust samples were collected and analyzed for each operation, and the ratio of total airborne float coal dust to respirable dust was calculated. During the continuous mining process, the ratio of total airborne float coal dust to respirable dust ranged from 10.3 to 13.8. The ratios measured on the longwall face were between 18.5 and 21.5. The total airborne float coal dust to respirable dust ratio observed during belt transport ranged between 7.5 and 21.8.

  20. Henretta Creek reclamation project

    International Nuclear Information System (INIS)

    Pumphrey, J.F.

    2009-01-01

    Teck Coal Ltd. operates 6 open-pit coal mines, of which 5 are located in the Elk Valley in southeastern British Columbia. The Fording River Operations (FRO) began in 1971 in mining areas in Eagle Mountain, Turnbull Mountain and Henretta Valley. The recovery of approximately 5 million tons of coal from the Henretta Creek Valley posed significant challenges to mine planners, hydrologists and environmental experts because the coal had to be recovered from the valley flanks and also from under the main valley floor, on which the fish-bearing Henretta Creek runs. The Henretta Dragline Mining project was described along with the water control structures and fisheries management efforts for the cutthroat trout. A detailed Environmental Impact Assessment and Stage 1 mining report for the Henretta Valley area was completed in December 1990. FRO was granted a mining and reclamation permit in 1991. A temporary relocation of 1,270 metres was required in in April 1997 in order to enable mining on both sides and below the creek bed. Among the innovative construction techniques was a diversion of Henretta Creek through large diameter steel culverts and a specialized crossing of the creek to allow fish passage. The first water flowed through the reclaimed Henretta Creek channel in late 1998 and the first high flow occurred in the spring of 2000. Teck coal FRO then launched an annual fish and fish habitat monitoring program which focused on the Henretta Creek Reclaimed Channel and Henretta Lake. This document presented the results from the final year, 2006, and a summary of the 7 year aquatic monitoring program. It was concluded that from mining through to reclamation, the Henretta project shows the commitment and success of mining and reclamation practices at Teck Coal. Indicators of the project's success include riparian zone vegetation, fisheries re-establishment, aquatic communities and habitat utilization by terrestrial and avian species. 33 refs., 1 fig.

  1. Optimization of the productivity in the mine; Optimizacion de la Productividad en Mina

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    The project consisted of putting in place a performance system which helps to optimise or maintain in a consistent manner the productivity of the mine, from storage onwards. The system also enables the analysis of the most significant information arising from the mining operations and other departments involved in the production process. In parallel to this, the project aimed to improve safety in the mine, and lead to an improvement in the working conditions of men and equipment. In order to achieve this, the project centred on: - Developing a relational database that collects discretely, and when operational, automatically, the principal and most significant parameters in the production process. - Monitoring and controlling the various operations in which equipment is involved. - A detailed analysis of the organisation and work methods, utilising continuous improvement techniques, which initially was aimed at the improve of safety, and equipment maintenance. Having completed the project, it can be confirmed that improvements were obtained in all performance areas. In addition, the database and control system controlling the most representative technical, physical and economics barriers of the production system continue to operate, and constitute a very efficient and modern tool in the management of the mining process, which is one of the most competitive within the underground coal mining industry in Spain. (Author)

  2. Geotechnical design of underground slate mines

    International Nuclear Information System (INIS)

    Iglesias Comesaña, C.; Taboada Castro, J.; Arzúa Touriño, J.; Giráldez Pérez, E.; Martín Suárez, J.M.

    2017-01-01

    Slate is one of the most important natural materials in Spain, with a potent extractive and processing industry concentrated in the autonomous communities of Galicia, Castile and León. Thanks to its resistance to external agents, its impermeability and its excellent cleavability, slate is used as for roofing and tiling. Almost all the active exploitations in our country where this resource is extracted are open pit mines, where the exploitation ratios have nearly reached their economic limit, making it necessary to look for alternatives that will allow the mining works to be continued. Underground mining is a solution that offers low exploitation ratios, with low spoil generation. The room-and-pillar method with barrier pillars is usually applied for the exploitation of slate deposits. There are several factors to be taken into account when designing a mine (economic, logistical, geotechnical, technical, environmental…), especially for an underground mine. This study focuses on the geotechnical design process of a room-and-pillar underground mine, based on the tributary area theory, the analysis of the tensions in the ground with numerical methods and the choice of an appropriate reinforcement in view of the expected instabilities. This explanation is completed with an example of a design that includes the estimate exploitation rates and production. [es

  3. Decommissioning of facilities for mining and milling or radioactive ores and closeout of residues

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this report is to provide information to Member States in order to assist in planning and implementing the decommissioning/closeout of uranium mine/mill facilities, mines, tailings impoundments, mining debris piles, leach residues and unprocessed ore stockpiles. The report presents an overview of the factors involved in planning and implementing the decommissioning/closeout of uranium mine/mill facilities. The information applies to mines, mills, tailings piles, mining debris piles and leach residues that are present as operational, mothballed or abandoned projects, as well as to future mining and milling projects. The report identifies the major factors that need to be considered in the decommissioning/closeout activities, including regulatory considerations; decommissioning of the mine/mill buildings, structures and facilities; decommissioning/closeout of open pit and underground mines; decommissioning/closeout of tailings impoundments; decommissioning/closeout of mining debris piles, unprocessed ore and other contaminated material such as heap leach piles, in situe leach facilities and contaminated soils; restoration of the site, vicinity properties and groundwater; radiation protection and health and safety considerations; and an assessment of costs and post-decommissioning or post-closeout maintenance and monitoring needs. 55 refs, figs and tabs

  4. Mining and mining authorities in Saarland 2016. Mining economy, mining technology, occupational safety, environmental protection, statistics, mining authority activities. Annual report

    International Nuclear Information System (INIS)

    2016-01-01

    The annual report of the Saarland Upper Mining Authority provides an insight into the activities of mining authorities. Especially, the development of the black coal mining, safety and technology of mining as well as the correlation between mining and environment are stressed.

  5. Problems and solutions of reliability issues for external power supply in the coal mines

    Directory of Open Access Journals (Sweden)

    И. Ю. Семыкина

    2017-08-01

    Full Text Available Restructuring of the energy sector  and liberalization of the electricity market resulted in separation of a single industry into a multitude of generating companies, federal and interregional distribution utilities, regional power providers and energy suppliers. For a number of reasons, related to the process of managing separate companies, faults in the laws and regulations, and unsatisfactory technical state of the energy equipment both on the part of distributors and consumers, reliability of energy supply faces increasing negative trends, which potentially can lead to big problems. Up to this day the energy sector does not have a developed database on the state of equipment and results of its maintenance, nor has it defined criteria to actually assess technical conditions of the equipment. The authors propose to develop and implement a mechanism aimed at technical auditing and monitoring of the engineering state of external power supply system, whose results can help in the development of more efficient and economically sound measures to improve reliability of energy supply. In recent years, a lot of attention has been paid to the issues of enhanced security of industrial power supply. However, specific characteristics of underground coal mining and enormous work load of the production process limit the applicability of developed methods and algorithms. Existing research does not address economic issues of reliable energy supply, either direct (economic damage from power interruptions, contractual security of supply, tariff regulation or indirect (charges for utility connection with a required level of reliability. There is no explicit definition for the term «autonomous energy source», nor is there a list of power receivers falling into the first and «special» categories according to their reliability. The paper contains a range of urgent problems and solutions that will increase reliability of external power supply in the coal mines.

  6. In-situ leach mining: the next quantum leap?

    International Nuclear Information System (INIS)

    Hancock, S.

    1988-01-01

    The opportunities and problems which in-situ leach mining technology presents to the mining industry are considered. These are exemplified by concerns addressed in the development of a proposal to mine uranium by in-situ leach techniques at Beverley in South Australia. The technique proposed at Beverley will use sulphuric acid with hydrogen peroxide or dissolved oxygen as the lixivient. Pre-treatment of the aquifer will be necessary to remove excess calcium carbonate, and the system will employ a slightly overpumped output of fluid through the wellfield to reduce the risk of excursions of mining solutions. The input and output patterns will also be varied to take account of the hydrogeological conditions such as confining bed thickness and permeability. Much study has been directed towards the post mining condition of the ore zone and the threat it may pose to the water resources of the region. 10 refs., 1 fig

  7. Main trends in scientific-research works during construction and operation of uranium mines and open cuts

    International Nuclear Information System (INIS)

    Mosinets, V.N.

    1993-01-01

    Consideration is given to main trends in research works during construction and operation of uranium mines and open cuts of Priargunsky mine-chemical association. Develops and introduced principally new design solutions and technologies in the field of open mining, underground mining, as well as in-situ and heap leaching, are described

  8. Investigations of processes relevant to final storage before, during and after flooding of the Hope salt mine

    International Nuclear Information System (INIS)

    1986-07-01

    Due to the measurement and monitoring program in the partly flooded former Hope salt mine it is possible to obtain considerable new knowledge for the theoretical case of 'access of water or alkaline solution in the post-operation phase' for a final store in a salt deposit. An important part of the Hope research and development project was the selection and testing of suitable measuring equipment, data collection and transmission devices in difficult working conditions. The purpose of this seminar was to introduce the Hope research and development project and the results obtained so far to all the authorities and institutions taking part. 9 lectures recorded separately in data bases were held for this purpose. (orig./PW) [de

  9. Retrofit SCR system for NOx control from heavy-duty mining equipment

    International Nuclear Information System (INIS)

    Mannan, M.A.

    2009-01-01

    Diesel engines are used extensively in the mining industry and offer many advantages. However, particulate matter (PM) emissions and nitrogen oxide emissions (NOx) are among its disadvantages. A significant concern related to PM and NOx in an underground mine involves the use of diesel exhaust after treatment systems such as diesel particulate filters and selective catalytic reduction (SCR). This presentation discussed NOx and PM control and provided a description of an SCR system and examples of SCR retrofits. Options for NOx control were discussed and a case study involving the installation of an SCR retrofit system in an underground mine operated by Sifto Salt was also presented. The purpose of the case study was to identify cost effective retrofit solutions to lower nitrogen dioxide emissions from heavy-duty trucks operating in underground mines. The case study illustrated and presented the candidate vehicle, baseline emissions, a BlueMax SCR retrofit solution, and BlueMax installation. 1 tab., 6 figs.

  10. CFD analysis of 58 Adit main fans parallel installation for the 2015–2019 underground developments of the new level mine project

    International Nuclear Information System (INIS)

    Hurtado, J.P.; Acuña, E.I.

    2015-01-01

    The New Level Mine project (NLMP), the planned underground expansion of the El Teniente mine in Rancagua, Chile, is expected to reach a daily extraction rate between 137 and 180 ktpd upon achieving full capacity. Production is planned to start in the year 2019. To achieve the 2015 to 2019 underground development schedule, the ventilation requirements were estimated to be in the range of 944 m 3 /s (2000 kcfm). To provide the airflow volume required, 189 m 3 /s (400 kcfm) has to be provided by the El Teniente mine, and the remaining by the main 74 and 75 Adits, currently in the final stage of their construction phase. However, providing the 189 m 3 /s (400 kcfm) will require significant modifications to the current system of El Teniente. As a result, a number of alternatives were explored, including adding raises to generate parallel airways and installing fans to reinforce the current ventilation system. From the alternatives studied, the installation of a second main fan (system) in parallel to an existing one was identified as the best operational solution and selected for implementation. However, the location and expected geometry of the ventilation circuit was not ideal and there were concerns as to the operation of both fans once the second fan was installed and commissioned. This paper presents the study used to estimate the operating points of both the current and the new fan, and to justify the parallel installation of the additional main fan. An additional computational fluid dynamics study was undertaken to validate the operating point, given the particular geometry of the fan's location and placement, to guarantee a stable operation of the fans. - Highlights: • Simulation of main fan parallel split with all airways of same cross sectional area. • Parallel split simulated using CFD, ventilation models and an analytical estimation. • Reference books underestimate shock losses according to CFD results. • Analytical estimation closer to

  11. The application of option pricing theory to the evaluation of mining investment

    Institute of Scientific and Technical Information of China (English)

    ZHANG Neng-fu(张能福); CAI Si-jing(蔡嗣经); LIU Chao-ma(刘朝马); TANG Rui(唐瑞)

    2003-01-01

    A rational evaluation on an investment project forms the basis of a right investment decision-making. The discounted cash flow (DCF for short) method is usually used as a traditional evaluation method for a project investment. However, as the mining investment is influenced by many uncertainties, DCF method cannot take into account these uncertainties and often underestimates the value of an investment project. Based on the option pricing theory of the modern financial assets, the characteristics of a real project investment are discussed, and the management option of mine managers and its pricing method are described.

  12. Intelligent Mining Engineering Systems in the Structure of Industry 4.0

    OpenAIRE

    Rylnikova Marina; Radchenko Dmitriy; Klebanov Dmitriy

    2017-01-01

    The solution of the problem of improving the human environment and working conditions at mines is based on the provision of the rationale of parameters and conditions for the implementation of an environmentally balanced cycle of comprehensive development of mineral deposits on the basis of the design of mining engineering systems characterized by the minimization of the human factor effect in danger zones of mining operations. In this area, robotized technologies are being developed, machine...

  13. Mining aspects of hard to access oil sands deposits

    Energy Technology Data Exchange (ETDEWEB)

    Stephenson, G.; Wright, D.; Lukacs, Z. [Norwest Corp., Calgary, AB (Canada)

    2006-07-01

    While a variety of oil sands mining technologies have been explored since the 1960s, the oil sands industry has generally favoured truck and shovel mining as a proven, low-cost mining solution. However, surface mining economics are affected by the price of bitumen, haul distances, tailings storage and geotechnical constraints. Maintenance, labour and the cost of replacing tires and ground engaging tools also have a significant impact on the economics of surface mining. Large volumes of water are used in surface mining, and remediation of surface mined areas can take hundreds of years. Damage to machinery is common as oil sands are abrasive and adhere to equipment. This presentation examined recent technologies developed to improve the economics of surface mining. Various extraction and tailings technologies were reviewed. Issues concerning the integration of mining and extraction processes were discussed. Various monitoring tools were evaluated. A review of new underground mining options included outlines of: longwall mining; sub-level caving; tunnel boring; and room and pillar extraction techniques. A generalized regional geology was presented. It was concluded that the oil sands surfacing mining industry should concentrate on near-term research needs to improve the performance and economics of proven technologies. Screening studies should also be conducted to determine the focus for the development of underground technologies. refs., tabs., figs.

  14. Utilization of old mine workings in the Czech Republic

    Czech Academy of Sciences Publication Activity Database

    Žůrek, P.; Hudeček, V.; Kukutsch, Radovan

    2012-01-01

    Roč. 60, 7-8 (2012), s. 151-155 ISSN 0022-2755 R&D Projects: GA ČR GA105/09/0089 Institutional support: RVO:68145535 Keywords : mine workings * mining activities * surface facilities * underground mine Subject RIV: DH - Mining, incl. Coal Mining http://www.scopus.com/record/display.url?eid=2-s2.0-84870880845& origin =resultslist&sort=plf-f&src=s&st1=kukutsch%2cr&sid=CD61C9F089315996D3718D4C2665E864.I0QkgbIjGqqLQ4Nw7dqZ4A%3a30&sot=b&sdt=b&sl=23&s=AUTHOR-NAME%28kukutsch%2cr%29&relpos=0&relpos=0&searchTerm=AUTHOR-NAME%28kukutsch%2Cr%29#

  15. Uranium - a challenging mining business

    International Nuclear Information System (INIS)

    Stadelhofer, J.W.; Wedig, M.J.

    2007-01-01

    The main application of uranium is its use as a fuel for the nuclear electricity generation. Presently about 68,000 t (177 mill. lbs) of uranium are annually required, of which 41,500 (108 mill. lbs) are provided from fresh mine production whereas 26,500 t (69 mill. lbs) are stock drawdown supplies from civil or military sources. Two-thirds of production are recovered by underground mining and about 75% (30,350 t) of the world's uranium mine production are extracted from top ten mines. All major uranium mining companies are making efforts to enlarge their production capacities: The paramount Cameco's Cigar Lake project has been delayed due to mine water inflow. Production is expected to commence by latest in 2010; the nameplate capacity of 6000 t/a should be reached in 2011. AREVA reported plans to invest about Euro 500 to 600 mill. to double its uranium production by 2010. In 2006 Denison Mines and International Uranium Corporation announced that they have entered into an agreement to merge the two companies in order to create a mid-tier, North American-focused uranium producer with the potential annual production of more than 5.5 mill. lbs of U 3 O 8 by 2010. The skyrocketing global electricity demand, growing public acceptance and more favourable policies have initiated a new round of global development of the nuclear industry. Against this backdrop, about 30,000 t/a to 40,000 t/a of additional mine production will be required within the upcoming 20 years to substitute secondary uranium supplies and to meet the expected increased demand; new start-up junior mining companies (e.g. Paladin) will contribute to this increased production. (orig.)

  16. Regulation of uranium mining in the Northern Territory

    International Nuclear Information System (INIS)

    McGill, R.A.

    2002-01-01

    In Australia, uranium and other 'prescribed substances', including thorium, and any element having an atomic number greater than 92, are the property of the Commonwealth under the Atomic Energy Act 1953. However, the regulation of mining in Australia is managed by the States. The Uranium Mining Environment Control Act, was passed by the NT in 1978 and this remains the primary legislation through which uranium mining is regulated. Under working arrangements with the Commonwealth, the NT carries out regulatory activities including monitoring, evaluation and surveillance, in respect of each of the operating mines. The monitoring is overseen, validated and its continuing relevance audited by the Commonwealth Office of the Supervising Scientist and the Northern Land Council representing the local traditional owners. Environment Impact Assessment is co-ordinated jointly by the Commonwealth and the NT and has recently been concluded for the Jabiluka Project. Delays in final approval on this project are occasioned by social concerns expressed by some of the traditional indigenous owners and anti-nuclear protestors. Although Jabiluka is not in a World Heritage area, the concerns have resulted in intervention by the World Heritage Commission. This has required the Company and the Government to modify the way they handle the approval process. This paper analyses the development of the regulatory system which evolved to ensure best practice environmental, occupational health and safety management on the NT uranium mines. (author)

  17. Post-mining in Walloon region

    International Nuclear Information System (INIS)

    Arnould, R.; Delbeuck, C.; Flamion, B.

    2003-01-01

    several studies are presently undertaken in the Walloon Region so as to assess the long term environmental impact caused by the shutting down of coal mines and their pumping operations. In many locations, new problems are encountered, such as sudden underground water appearance at hill slopes, coal heaps instability or flooding of underground cellars. Slope instability increase risks. The main goals of the presented studies are to suppress or at least to limit those risks and inconveniences and propose solutions to be implemented in the framework of the existing dewatering facilities built by the Walloon Region and local authorities in mines induced subsidence areas. (authors)

  18. The passivation of calcite by acid mine water. Column experiments with ferric sulfate and ferric chloride solutions at pH 2

    Energy Technology Data Exchange (ETDEWEB)

    Soler, Josep M. [Institute of Earth Sciences ' Jaume Almera' (CSIC), Lluis Sole i Sabaris s/n, 08028 Barcelona, Catalonia (Spain); Institute of Environmental Assessment and Water Research (CSIC), Jordi Girona 18, 08034 Barcelona, Catalonia (Spain)], E-mail: jsoler@ija.csic.es; Boi, Marco [Institute of Earth Sciences ' Jaume Almera' (CSIC), Lluis Sole i Sabaris s/n, 08028 Barcelona, Catalonia (Spain); Institute of Environmental Assessment and Water Research (CSIC), Jordi Girona 18, 08034 Barcelona, Catalonia (Spain); Mogollon, Jose Luis [Institute of Earth Sciences ' Jaume Almera' (CSIC), Lluis Sole i Sabaris s/n, 08028 Barcelona, Catalonia (Spain); Instituto de Ciencias de la Tierra, Universidad Central de Venezuela, Caracas 1020-A (Venezuela, Bolivarian Republic of); Cama, Jordi; Ayora, Carlos [Institute of Earth Sciences ' Jaume Almera' (CSIC), Lluis Sole i Sabaris s/n, 08028 Barcelona, Catalonia (Spain); Institute of Environmental Assessment and Water Research (CSIC), Jordi Girona 18, 08034 Barcelona, Catalonia (Spain); Nico, Peter S.; Tamura, Nobumichi; Kunz, Martin [Lawrence Berkeley National Laboratory, 1 Cyclotron Road, Berkeley, CA 94720 (United States)

    2008-12-15

    Column experiments, simulating the behavior of passive treatment systems for acid mine drainage, have been performed. Acid solutions (HCl or H{sub 2}SO{sub 4}, pH 2), with initial concentrations of Fe(III) ranging from 250 to 1500 mg L{sup -1}, were injected into column reactors packed with calcite grains at a constant flow rate. The composition of the solutions was monitored during the experiments. At the end of the experiments (passivation of the columns), the composition and structure of the solids were measured. The dissolution of calcite in the columns caused an increase in pH and the release of Ca into the solution, leading to the precipitation of gypsum and Fe-oxyhydroxysulfates (Fe(III)-SO{sub 4}-H{sup +} solutions) or Fe-oxyhydroxychlorides (Fe(III)-Cl-H{sup +} solutions). The columns worked as an efficient barrier for some time, increasing the pH of the circulating solutions from 2 to {approx}6-7 and removing its metal content. However, after some time (several weeks, depending on the conditions), the columns became chemically inert. The results showed that passivation time increased with decreasing anion and metal content of the solutions. Gypsum was the phase responsible for the passivation of calcite in the experiments with Fe(III)-SO{sub 4}-H{sup +} solutions. Schwertmannite and goethite appeared as the Fe(III) secondary phases in those experiments. Akaganeite was the phase responsible for the passivation of the system in the experiments with Fe(III)-Cl-H{sup +} solutions.

  19. Use of the Contingent Valuation Method in the assessment of a landfill mining project.

    Science.gov (United States)

    Marella, Giuliano; Raga, Roberto

    2014-07-01

    A comprehensive approach for the evaluation of the economic feasibility of landfill mining (LFM) should take into account not only the direct costs and revenues for the private investor, but also the social benefits or costs (generally called externalities), in such a way that projects generating major social benefits (and no significant private revenues) are not overlooked. With a view to contributing to the development of a common framework for the evaluation of LFM projects, this paper presents the results of a case study where the issue of the assessment of social benefits from a LFM project is addressed. In particular, the Contingent Valuation Method is applied for the monetary assessment of the community-perceived benefits from the remediation of an old uncontrolled waste deposit by means of LFM and the conversion of the area into a park. Based on the results of a survey carried out on a random sample of people living near the old landfill, the economic values of the individual willingness to pay (WTP) for LFM and the subsequent creation of a public park were calculated and the correlations with the relevant variables (distance from the landfill site, age, income, sex, education level) assessed. The results were then suitably extended and the monetary value of the welfare increase of the whole population resident in the area and potentially affected both by LFM and the creation of the park was calculated. Copyright © 2014 Elsevier Ltd. All rights reserved.

  20. Long-hole destress blasting for rockburst control during deep underground coal mining

    Czech Academy of Sciences Publication Activity Database

    Koníček, Petr; Souček, Kamil; Staš, Lubomír; Singh, R.

    -, č. 61 (2013), s. 141-153 ISSN 1365-1609 R&D Projects: GA MŠk ED2.1.00/03.0082 Institutional support: RVO:68145535 Keywords : Ostrava - Karvina Coal basin * longwall mining * rockbursts * destress blasting Subject RIV: DH - Mining, incl. Coal Mining Impact factor: 1.424, year: 2013 http://www.sciencedirect.com/science/article/pii/S1365160913000348

  1. Mining Product Data Models: A Case Study

    Directory of Open Access Journals (Sweden)

    Cristina-Claudia DOLEAN

    2014-01-01

    Full Text Available This paper presents two case studies used to prove the validity of some data-flow mining algorithms. We proposed the data-flow mining algorithms because most part of mining algorithms focuses on the control-flow perspective. First case study uses event logs generated by an ERP system (Navision after we set several trackers on the data elements needed in the process analyzed; while the second case study uses the event logs generated by YAWL system. We offered a general solution of data-flow model extraction from different data sources. In order to apply the data-flow mining algorithms the event logs must comply a certain format (using InputOutput extension. But to respect this format, a set of conversion tools is needed. We depicted the conversion tools used and how we got the data-flow models. Moreover, the data-flow model is compared to the control-flow model.

  2. Metal Separations and Recovery in the Mining Industry

    Science.gov (United States)

    Izatt, Steven R.; Bruening, Ronald L.; Izatt, Neil E.

    2012-11-01

    Molecular Recognition Technology (MRT) plays an important role in the hydrometallurgical processing dissolved entities in solutions in the mining industry. The status of this industry with respect to sustainability and environmental issues is presented and discussed. The roles of MRT and ion exchange in metal separation and recovery processes in the mining industry are discussed and evaluated. Examples of MRT separation processes of interest to the mining community are given involving gold, cobalt purification by extraction of trace cadmium, rhenium, and platinum group metals (PGMs). MRT processes are shown to be sustainable, economically viable, energy efficient, and environmentally friendly, and to have a low carbon footprint.

  3. Naesliden Project: why, what for, and how

    Energy Technology Data Exchange (ETDEWEB)

    Kolsrud, B.

    1980-05-15

    Mechanization of cut-and-fill mining has resulted in larger span of mine openings as well as in demands on lower frequency of disruptions due to mine stability problems. These demands arose due to the heavy investment in machines as well as in preparation works per stope. Better knowledge of the rock mechanics of the mining method became a necessity. For this purpose it was decided to run a systematic monitoring program from the very start of mining at Boliden's Naesliden Mine in order to obtain a comprehensive record of the reaction of the rock mass to mining. It was also recognized that, for the purpose of prediction of future mining conditions, the use of reliable numerical models for mine design would be an advantage. The access to rock mechanics observations of the Naesliden Mine made it possible to evaluate the reliability of numerical modelling techniques as a practical planning tool in mining. This evaluation is the aim of the Naesliden Project. The project was organized in five stages; data collection and preliminary calculations. Establishing a FEM-model of the Naesliden Mine, based exclusively on the input parameters in stage 1 and comparison of model and mine behavior. Sensitivity aspects of the FEM-model and supplementary determination of input data. Development of an improved model based on sensitivity analysis and information derived from prototype behaviour. Application of the results to practical mining situation. This stage is not part of the study hiterto carried out.

  4. Naesliden Project: why, what for, and how

    Energy Technology Data Exchange (ETDEWEB)

    Kolsrud, B.

    1980-05-15

    Mechanization of cut-and-fill mining has resulted in larger span of mine openings as well as in demands on lower frequency of disruptions due to mine stability problems. These demands arose due to the heavy investment in machines as well as in preparation works per stope. Better knowledge of the rock mechanics of the mining method became a necessity. For this purpose it was decided to run a systematic monitoring program from the very start of mining at Boliden's Naesliden Mine in order to obtain a comprehensive record of the reaction of the rock mass to mining. It was also recognized that, for the purpose of prediction of future mining conditions, the use of reliable numerical models for mine design would be an advantage. The access to rock mechanics observations of the Naesliden Mine made it possible to evaluate the reliability of numerical modelling techniques as a practical planning tool in mining. This evaluation is the aim of the Naesliden Project. The project was organized in five stages; data collection and preliminary calculations. Establishing a FEM-model of the Naesliden Mine, based exclusively on the input parameters in stage 1 and comparison of model and mine behavior. Sensitivity aspects of the FEM-model and supplementary determination of input data. Development of an improved model based on sensitivity analysis and information derived from prototype behaviour. Application of the results to practical mining situation. This stage is not part of the study hiterto carried out.

  5. Seabed mining law in turmoil

    Science.gov (United States)

    Bell, Peter M.

    When it was realized last December that the United States would not sign the United Nations (U.N.) Law of the Sea Convention, it was suspected that the issue of deep seabed mining was a preeminent factor. According to a recent discussion by members of the Marine Resources Project of the University of Manchester, U.K. (New Sci., January 1983), the thinking of many national delegations was focused on the aspects of ocean-floor nodule mining. The United States would rather make less sweeping agreements, limited to those countries that already have deep-sea mining investments. Such an agreement has been made on an interim basis between the United States, France, West Germany, and the United Kingdom. Third World nations, on the other hand, have a vested interest in having the convention signed, because they would share in the profits.

  6. Teaching Financial Data Mining using Stocks and Futures Contracts

    Directory of Open Access Journals (Sweden)

    Gary Boetticher

    2005-06-01

    Full Text Available Financial data mining models is considered to be "the hardest way to make easy money." Data miners are certainly motivated by the prospect of discovering a financial "Holy Grail." However, designing and implementing a successful model poses many intellectual challenges. These include securing and cleaning data; acquiring a sufficient amount of financial domain knowledge; bounding the complexity of the problem; and properly validating results. Teaching financial data mining is especially difficult due to the student's limited financial domain knowledge and the relatively short period (one semester for building financial models. This paper describes an application of a financial data mining term project based on Stock and E-Mini futures contracts and discusses "lessons learned" from assigning similar term projects over six different semesters. Results of each case study results are presented and discussed.

  7. Opportunities and Challenges in Deep Mining: A Brief Review

    Directory of Open Access Journals (Sweden)

    Pathegama G. Ranjith

    2017-08-01

    Full Text Available Mineral consumption is increasing rapidly as more consumers enter the market for minerals and as the global standard of living increases. As a result, underground mining continues to progress to deeper levels in order to tackle the mineral supply crisis in the 21st century. However, deep mining occurs in a very technical and challenging environment, in which significant innovative solutions and best practice are required and additional safety standards must be implemented in order to overcome the challenges and reap huge economic gains. These challenges include the catastrophic events that are often met in deep mining engineering: rockbursts, gas outbursts, high in situ and redistributed stresses, large deformation, squeezing and creeping rocks, and high temperature. This review paper presents the current global status of deep mining and highlights some of the newest technological achievements and opportunities associated with rock mechanics and geotechnical engineering in deep mining. Of the various technical achievements, unmanned working-faces and unmanned mines based on fully automated mining and mineral extraction processes have become important fields in the 21st century.

  8. Maximizing the potential of mining tourism through knowledge infrastructures

    Directory of Open Access Journals (Sweden)

    Branislav Kršák

    2015-12-01

    Full Text Available The proposed paper deals with different approaches to the issue of shortage of relevant customer behavior data and key performance indicators for evaluating and planning for mining tourism. Mining tourism's offer is concentrated in tourist destinations emerging from tourist sub-regions or other areas of interest that by unwritten rules may or may not copy administrative boundaries of NUTS 5 areas. Management of mining tourism's offer is a part of destination management organizations' processes, which within their planning are dependent on huge amounts of data as key components of their knowledge infrastructure. In Slovakia, the issue of knowledge infrastructures in tourism is approached by the Tourism Satellite Account (TSA with redeemable value to the national economy and published only as an informative report. On the other hand, regarding tourism destination management on the principles of knowledge-based economy, publicly available statistics at levels of NUTS 4-5 do not have an exact information value regards to the performance of mining tourism's offer. These facts cause lack of effective support of mining tourism in Slovakia and create significant barriers in information cooperation of tourism stakeholders. Data management and analysis may be challenging to tourism stakeholders. Information technologies offer advanced features as detection of qualitative patterns and hidden dependencies as well as the possibility of continuous study of destination's KPI evolution. Different examples around the world show that information collected in ICT knowledge infrastructures can be used as intelligent decision support tools. The tools can connect tourism and mining tourism stakeholders into a system based on knowledge and provide them with solutions to complex problems without having deep technical expertise. The results show that the issued problematic of data shortage in destination management could be solved through implementation of destination

  9. An example of competitive mining in the EEC: the new Hullera Vasco Leonesa mine; Un ejemplo de mineria competitiva en la C.E.E.: la nueva mina de Hullera Vasco Leonesa

    Energy Technology Data Exchange (ETDEWEB)

    Valle Menendez, A. [HUNOSA, Madrid (Spain)

    1992-09-01

    The Sociedad Anonima Hullera Vasco Leonesa has always carried out a great amount of research, as much in the pursuit of new coal resources as in the modernisation and improvement of methods. Thanks to this activity and, after a series of specialized studies, they have managed to define the New Mine (Nueva Mina) project, which seeks to extend and prolong a current mine by exploiting a new and deeper zone. The production of the mine will start at 1.25 Mt saleables per year and the usable resources will be 604 kg saleables per man hour. The initial investment of the project is 28.247 MPTA 1990. The report explains the different stages in planning the mine: the seam, the usable reserves, the methods of exploitation, the output, the infrastructure, etc. Finally, the basic aspects of the profitability of the project are analysed and their compliance with the competition criteria of the EEC. 6 figs., 4 tabs.

  10. Regional Transmission Projects: Finding Solutions

    Energy Technology Data Exchange (ETDEWEB)

    The Keystone Center

    2005-06-15

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association

  11. Research on the prevention of mine accident (III)

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Won Jai; Kang, Chang Hee; Lee, Sang Kwon; Lee, Jong Lim; Kang, Sang Soo [Korea Institute of Geology Mining and Materials, Taejon (Korea, Republic of)

    1997-12-01

    This research project is for providing foundation of safety in coal mines. Third year`s research has been carried out on Sabuk and Tongbo coal mine. Sabuk coal mine is a comparatively fair status in view of safety, but it has following difficulties due to it`s wide developing area. - Because the most of the mining methods is the slanted chute caving method, it is difficult to maintain long coal raises and dangers of disaster by collapse is exists all the time. - Due to the operation of many contractors, it is difficult to manage safety matters. - Because many equipment are distributed widely in underground, there are dangers of catastrophic disaster whenever fire is outbreak. The mines are doing their best to prevent mine disasters, but the government`s support for steel support and fire resistive structures are strongly recommended. Tongbo mine is one of the mid-scaled mine and their working environment is fairly good as of now due to their shallow developing depth. However, their is a dangers for water inrush at workings in pocket type coal seams. Accordingly, careful analysis of mined out area and special measures for possible water aquifer has to be pursued. (author). 11 refs., 63 tabs., 22 figs.

  12. Degasification possibilities evaluation in Socotá coal mines (Boyacá, Colombia

    Directory of Open Access Journals (Sweden)

    Jorge Eliécer Mariño-Martínez

    2016-09-01

    Those wells would not only produce gas, but would also degas the future underground mining areas. The combination of degasification and ventilation would considerably allow a decrease in the explosions risk. The high coalbed methane content in the area could produce energy for the mining company or commercial gas for the natural gas distribution network. The Socotá area has the ideal conditions for a pilot project, which could be a model for other degasification projects in Colombia.

  13. The Hazards of Data Mining in Healthcare.

    Science.gov (United States)

    Househ, Mowafa; Aldosari, Bakheet

    2017-01-01

    From the mid-1990s, data mining methods have been used to explore and find patterns and relationships in healthcare data. During the 1990s and early 2000's, data mining was a topic of great interest to healthcare researchers, as data mining showed some promise in the use of its predictive techniques to help model the healthcare system and improve the delivery of healthcare services. However, it was soon discovered that mining healthcare data had many challenges relating to the veracity of healthcare data and limitations around predictive modelling leading to failures of data mining projects. As the Big Data movement has gained momentum over the past few years, there has been a reemergence of interest in the use of data mining techniques and methods to analyze healthcare generated Big Data. Much has been written on the positive impacts of data mining on healthcare practice relating to issues of best practice, fraud detection, chronic disease management, and general healthcare decision making. Little has been written about the limitations and challenges of data mining use in healthcare. In this review paper, we explore some of the limitations and challenges in the use of data mining techniques in healthcare. Our results show that the limitations of data mining in healthcare include reliability of medical data, data sharing between healthcare organizations, inappropriate modelling leading to inaccurate predictions. We conclude that there are many pitfalls in the use of data mining in healthcare and more work is needed to show evidence of its utility in facilitating healthcare decision-making for healthcare providers, managers, and policy makers and more evidence is needed on data mining's overall impact on healthcare services and patient care.

  14. Literature Mining Methods for Toxicology and Construction of ...

    Science.gov (United States)

    Webinar Presentation on text-mining methodologies in use at NCCT and how they can be used to assist with the OECD Retinoid project. Presentation to 1st Workshop/Scientific Expert Group meeting on the OECD Retinoid Project - April 26, 2016 –Brussels, Presented remotely via web.

  15. A Data Mining Approach for Cardiovascular Diagnosis

    Directory of Open Access Journals (Sweden)

    Pereira Joana

    2017-12-01

    Full Text Available The large amounts of data generated by healthcare transactions are too complex and voluminous to be processed and analysed by traditional methods. Data mining can improve decision-making by discovering patterns and trends in large amounts of complex data. In the healthcare industry specifically, data mining can be used to decrease costs by increasing efficiency, improve patient quality of life, and perhaps most importantly, save the lives of more patients. The main goal of this project is to apply data mining techniques in order to make possible the prediction of the degree of disability that patients will present when they leave hospitalization. The clinical data that will compose the data set was obtained from one single hospital and contains information about patients who were hospitalized in Cardio Vascular Disease’s (CVD unit in 2016 for having suffered a cardiovascular accident. To develop this project, it will be used the Waikato Environment for Knowledge Analysis (WEKA machine learning Workbench since this one allows users to quickly try out and compare different machine learning methods on new data sets

  16. Environmental assessment related to the operation of Hansen uranium mill project, WM-24, Cyprus Mines Corporation

    International Nuclear Information System (INIS)

    1981-01-01

    An environmental assessment was prepared by the staff of the U.S. Nuclear Regulatory Commission, Office of Nuclear Material Safety and Safeguards, in response to a request for technical assistance from the State of Colorado in connection with licensing action on the proposed Cyprus Mines Corporation, Hansen uranium project. The major components of discussion are (1) a summary and recommended licensing conditions, (2) a description of the site environment and the proposed facility operation as well as alternatives in comparison with NRC's performance objectives for tailings management, and (3) a radiological assessment for estimating the facility's compliance with 10 CFR 20 and 40 CFR 190 dose regulations. The NRC recommends licensing the proposed mill subject to stipulated license conditions

  17. Integrating Data Mining Techniques into Telemedicine Systems

    Directory of Open Access Journals (Sweden)

    Mihaela GHEORGHE

    2014-01-01

    Full Text Available The medical system is facing a wide range of challenges nowadays due to changes that are taking place in the global healthcare systems. These challenges are represented mostly by economic constraints (spiraling costs, financial issues, but also, by the increased emphasis on accountability and transparency, changes that were made in the education field, the fact that the biomedical research keeps growing in what concerns the complexities of the specific studies etc. Also the new partnerships that were made in medical care systems and the great advances in IT industry suggest that a predominant paradigm shift is occurring. This needs a focus on interaction, collaboration and increased sharing of information and knowledge, all of these may is in turn be leading healthcare organizations to embrace the techniques of data mining in order to create and sustain optimal healthcare outcomes. Data mining is a domain of great importance nowadays as it provides advanced data analysis techniques for extracting the knowledge from the huge volumes of data collected and stored by every system of a daily basis. In the healthcare organizations data mining can provide valuable information for patient's diagnosis and treatment planning, customer relationship management, organization resources management or fraud detection. In this article we focus on describing the importance of data mining techniques and systems for healthcare organizations with a focus on developing and implementing telemedicine solution in order to improve the healthcare services provided to the patients. We provide architecture for integrating data mining techniques into telemedicine systems and also offer an overview on understanding and improving the implemented solution by using Business Process Management methods.

  18. Managing environmental and health impacts of uranium mining

    International Nuclear Information System (INIS)

    Cameron, Ron; Vance, Robert

    2014-01-01

    Producing uranium in a safe and environmentally responsible manner is not only important to the producers and consumers of the product, but to society at large. Given the projected growth in nuclear generating capacity expected in the coming decades, particularly in the developing world, awareness of leading practice uranium mining needs to be increased globally. This report provides a non-technical overview of the driving forces behind and the outcomes of the significant evolution of uranium mining practices from the time that uranium was first mined for military purposes during the Cold War until today. (authors)

  19. The Hybrid Expert in the "Bergstaat": Anton Von Ruprecht as a Professor of Chemistry and Mining and as a Mining Official, 1779-1814

    Science.gov (United States)

    Konecny, Peter

    2012-01-01

    In the course of the 18th century a new type of scientifically educated functional elites developed, who were trained to administer mines. The educational project that led to the formation of a corps of mining engineers was part of a programme of administrative and economic reforms that led to a new configuration of bonds between state, economy…

  20. Mine Water Treatment in Hongai Coal Mines

    Science.gov (United States)

    Dang, Phuong Thao; Dang, Vu Chi

    2018-03-01

    Acid mine drainage (AMD) is recognized as one of the most serious environmental problem associated with mining industry. Acid water, also known as acid mine drainage forms when iron sulfide minerals found in the rock of coal seams are exposed to oxidizing conditions in coal mining. Until 2009, mine drainage in Hongai coal mines was not treated, leading to harmful effects on humans, animals and aquatic ecosystem. This report has examined acid mine drainage problem and techniques for acid mine drainage treatment in Hongai coal mines. In addition, selection and criteria for the design of the treatment systems have been presented.

  1. The HAW-Project. Test disposal of highly radioactive radiation sources in the Asse salt mine. Final report

    International Nuclear Information System (INIS)

    Rothfuchs, T.; Cuevas, C. de las; Donker, H.; Feddersen, H.K.; Garcia-Celma, A.; Gies, H.; Goreychi, M.; Graefe, V.; Heijdra, J.; Hente, B.; Jockwer, N.; LeMeur, R.; Moenig, J.; Mueller, K.; Prij, J.; Regulla, D.; Smailos, E.; Staupendahl, G.; Till, E.; Zankl, M.

    1995-01-01

    In order to improve the final concept for the disposal of high-level radioactive waste (HAW) in boreholes drilled into salt formation plans were developed a couple of years ago for a full scale testing of the complete technical system of an underground repository. To satisfy the test objectives, thirty highly radioactive radiation sources were planned to be emplaced in six boreholes located in two test galleries at the 800-m-level in the Asse salt mine. A duration of testing of approximately five years was envisaged. Because of licensing uncertainties the German Federal Government decided on December 3rd, 1992 to stop all activities for the preparation of the test disposal immediately. In the course of the preparation of the test disposal, however, a system, necessary for handling of the radiation sources was developed and installed in the Asse salt mine and two non-radioactive reference tests with electrical heaters were started in November 1988. These tests served for the investigation of thermal effects in comparison to the planned radioactive tests. An accompanying scientific investigation programme performed in situ and in the laboratory comprises the estimation and observation of the thermal, radiation-induced, and mechanical interaction between the rock salt and the electrical heaters and the radiation sources, respectively. The laboratory investigations are carried out at Braunschweig (FRG), Petten (NL), Saclay (F) and Barcelona (E). As a consequence of the premature termination of the project the working programme was revised. The new programme agreed to by the project partners included a controlled shutdown of the heater tests in 1993 and a continuation of the laboratory activities until the end of 1994. (orig.)

  2. Mine Water Treatment in Hongai Coal Mines

    OpenAIRE

    Dang Phuong Thao; Dang Vu Chi

    2018-01-01

    Acid mine drainage (AMD) is recognized as one of the most serious environmental problem associated with mining industry. Acid water, also known as acid mine drainage forms when iron sulfide minerals found in the rock of coal seams are exposed to oxidizing conditions in coal mining. Until 2009, mine drainage in Hongai coal mines was not treated, leading to harmful effects on humans, animals and aquatic ecosystem. This report has examined acid mine drainage problem and techniques for acid mine ...

  3. Coal mine reclamation: the cooperative approach

    Energy Technology Data Exchange (ETDEWEB)

    Blazenko, E J; Kuhn, J A

    1976-07-01

    Salient problems encountered in coal mine reclamation include land use and environmental protection values, license applications and subsequent reports, and the development of sound reclamation planning programs. The facts of life to be dealt with in reclamation and reclamation planning include encounters with negative attitudes toward reclamation, basic physics, chemistry, biology and geology, and the ability or inability to respond properly. The cooperative approach to reclamation includes interfacing with mining company personnel, government agencies, public-interest groups and consultants. Some promising solutions to reclamation, especially in alpine and subalpine regions, include handling of materials and organic test plot research.

  4. Legacies of the uranium ore mining industry and their restoration. A survey of Africa, Asia and Australia; Hinterlassenschaften des Uranerzbergbaus und deren Sanierung. Ein Ueberblick ueber Afrika, Asien und Australien

    Energy Technology Data Exchange (ETDEWEB)

    Waggitt, P. [International Atomic Energy Agency (IAEA), Vienna (Austria). Waste and Environmental Safety Section; Lersow, M. [Deutsche Gesellschaft fuer Geotechnik (DGGT) e.V., Breitenbrunn/Erzgebirge (Germany). Arbeitskreis ' Tailings' ; Maerten, H. [UIT GmbH, Dresden (Germany); Heathgate Resources Pty. Ltd., Adelaide, SA (Australia); Quasar Resources Pty. Ltd., Adelaide, SA (Australia)

    2008-03-13

    Management of the environment in the uranium mining industry has an eventful history of more than 50 years. In addition to examples of successful restoration of mining and preparation sites in some countries there are also numerous cases, in which no or defective restoration left behind serious waste deposits. In the course of the renaissance of the uranium industry there is increasing interest in the rehabilitation of such waste sites. There is still an urgent requirement to eradicate the environmental effects of the old mining industry. Previous deposits could be of interest for renewed working under the present economic boundary conditions. Restoration as an integral part of the current and future uranium mining industry with the application of modern international safety standards is extremely important. The contribution provides a survey of restoration projects of the old mining industry in various parts of the world and shows how the International Atomic Energy Agency, the national supervisory and approval authorities as well as the mining companies collaborate closely at many sites on solution of the difficult problems. (orig.)

  5. 2nd Essen specialized discussions about repository mining

    International Nuclear Information System (INIS)

    Reinartz, Jerome

    2013-01-01

    The final storage of nuclear waste in Germany right now is more a political and societal than technical process. To promote the exchange of experience in the sophisticated field of mining technology, and put the focus back on finding a repository solution, the DMT in cooperation with GNS and DBE Technology initiated the Essen Specialized Discussions about Repository Mining. On February 28, more than 120 participants sought information about recent developments, exchanged experience, and maintained contacts. (orig.)

  6. An Experimental Evaluation of the Weathering Effects on Mine Shaft Lining Materials

    Directory of Open Access Journals (Sweden)

    W. Yang

    2017-01-01

    Full Text Available Many shaft collapses are related to the deterioration and failure of the masonry shaft lining materials. In modern mine shaft, concrete is widely used to provide support. To analyse shafts stability, the properties of the lining need to be well defined. The behaviour of masonry and concrete can be considerably affected by long-term exposure to harsh mine water. This paper presents a study which focuses on the weathering effects of mine water on lining materials (brick, mortar, and concrete. To reproduce the weathering process, samples were placed into solutions of potable water, artificial mine water, and a more aggressive mine-water solution for just less than one year. Four phases of laboratory tests were conducted throughout the time period to assess the degradation of mechanical properties of the lining materials. Particular attention is given to the degradation of material strength and stiffness. Results indicate that the harsh acidic mine water has pronounced detrimental effects on the strength and stiffness of mortar. The weathering process is shown to have the most significant effect on the stiffness of concrete and mortar. It is also shown that the use of mass loss as an index for evaluation of mechanical properties may not be appropriate.

  7. Mine Water Treatment in Hongai Coal Mines

    Directory of Open Access Journals (Sweden)

    Dang Phuong Thao

    2018-01-01

    Full Text Available Acid mine drainage (AMD is recognized as one of the most serious environmental problem associated with mining industry. Acid water, also known as acid mine drainage forms when iron sulfide minerals found in the rock of coal seams are exposed to oxidizing conditions in coal mining. Until 2009, mine drainage in Hongai coal mines was not treated, leading to harmful effects on humans, animals and aquatic ecosystem. This report has examined acid mine drainage problem and techniques for acid mine drainage treatment in Hongai coal mines. In addition, selection and criteria for the design of the treatment systems have been presented.

  8. Ion activity and distribution of heavy metals in acid mine drainage polluted subtropical soils

    International Nuclear Information System (INIS)

    Li Yongtao; Becquer, Thierry; Dai Jun; Quantin, Cecile; Benedetti, Marc F.

    2009-01-01

    The oxidative dissolution of mine wastes gives rise to acidic, metal-enriched mine drainage (AMD) and has typically posed an additional risk to the environment. The poly-metallic mine Dabaoshan in South China is an excellent test site to understand the processes affecting the surrounding polluted agricultural fields. Our objectives were firstly to investigate metal ion activity in soil solution, distribution in solid constituents, and spatial distribution in samples, secondly to determine dominant environment factors controlling metal activity in the long-term AMD-polluted subtropical soils. Soil Column Donnan Membrane Technology (SC-DMT) combined with sequential extraction shows that unusually large proportion of the metal ions are present as free ion in the soil solutions. The narrow range of low pH values prevents any pH effects during the binding onto oxides or organic matter. The differences in speciation of the soil solutions may explain the different soil degradation observed between paddy and non-paddy soils. - First evidence of the real free metal ion concentrations in acid mine drainage context in tropical systems

  9. Fiscal 1999 engineer exchange project (field of coal mining technology), international exchange project. Domestic workshop; 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kokunai workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The domestic workshop invites Japanese engineers and engineers from coal producing countries for the exchange of coal mining technologies and aims to substantiate and facilitate the dispatching and receiving of engineers under training programs. The main subject of the Asia-Pacific coal technology workshop was 'Coal for the 21st century - resources and technology,' and there were two sessions held on September 8, titled 'Trends and tasks of coal resources exploitation' and 'Coal resources and production technology.' Lectures were delivered by five overseas and five Japanese coal engineering experts. On September 9, nine essays were presented concerning 'Coal resources and security problems' and 'Coal resources and environmental problems.' In addition, a panel discussion was held, titled 'Coal resources assessment and technology.' Importance was emphasized of the correct assessment of the magnitude of resources, development of probing technologies to collect more detailed information, improvement of digging speeds applicable to faces for large and high-efficiency mining, development of coal mining technologies for increased recovery, etc. Information was exchanged on various occasions and partnership was enhanced between the participants to the advantage of engineer exchanging projects in the future. (NEDO)

  10. Oil shale mines and their realizable production

    International Nuclear Information System (INIS)

    Habicht, K.

    1994-01-01

    The production of Estonian oil shale depends on its marketing opportunities. The realizable production is a function of the oil shale price, which in turn depends on production costs. The latter are dependent on which mines are producing oil shale and on the volume of production. The purpose of the present article is to analyze which mines should operate under various realizable production scenarios and what should be their annual output so that the total cost of oil shale production (including maintenance at idle mines) is minimized. This paper is also targeted at observing the change in the average production cost per ton of oil shale depending on the realizable output. The calculations are based on data for the first four months of 1993, as collected by N. Barabaner (Estonian Academy of Sciences, Institute of Economy). The data include the total production volume and production cost from the mines of RE 'Eesti Polevkivi' (State Enterprise 'Estonian Oil Shale'). They also project expenses from mine closings in case of conservation. The latter costs were allocated among mines in direct proportion to their respective number of employees. (author)

  11. Hydro-economic modelling in mining catchments

    Science.gov (United States)

    Ossa Moreno, J. S.; McIntyre, N.; Rivera, D.; Smart, J. C. R.

    2017-12-01

    Hydro-economic models are gaining momentum because of their capacity to model both the physical processes related to water supply, and socio-economic factors determining water demand. This is particularly valuable in the midst of the large uncertainty upon future climate conditions and social trends. Agriculture, urban uses and environmental flows have received a lot of attention from researchers, as these tend to be the main consumers of water in most catchments. Mine water demand, although very important in several small and medium-sized catchments worldwide, has received less attention and only few models have attempted to reproduce its dynamics with other users. This paper describes an on-going project that addresses this gap, by developing a hydro-economic model in the upper Aconcagua River in Chile. This is a mountain catchment with large scale mining and hydro-power users at high altitudes, and irrigation areas in a downstream valley. Relevant obstacles to the model included the lack of input climate data, which is a common feature in several mining areas, the complex hydrological processes in the area and the difficulty of quantifying the value of water used by mines. A semi-distributed model developed within the Water Evaluation and Planning System (WEAP), was calibrated to reproduce water supply, and this was complemented with an analysis of the value of water for mining based on two methods; water markets and an analysis of its production processes. Agriculture and other users were included through methods commonly used in similar models. The outputs help understanding the value of water in the catchment, and its sensitivity to changes in climate variables, market prices, environmental regulations and changes in the production of minerals, crops and energy. The results of the project highlight the importance of merging hydrology and socio-economic calculations in mining regions, in order to better understand trade-offs and cost of opportunity of using

  12. The use of alkali-activated fly ash grouts for the remediation of AMD from underground mines

    International Nuclear Information System (INIS)

    Eaker, C.A.; Longley, R.D.; Michaud, L.H.; Silsbee, M.R.

    1996-01-01

    In preparation for a field demonstration, laboratory studies were conducted using several fly ash grout formulations to determine the optimum grout for an underground mine environment. This paper discusses the portion of the overall project designed to examine grout-acid mine drainage (AMD) interactions including neutralization, leaching and armoring of the grouts. Leaching tests were performed to study the effects of fly ash grout on AMD, including the effects of armoring. The goal of this project is to study the feasibility of in-situ acid mine drainage treatment by injecting alkali-activated fly ash grout into an underground mine

  13. Statistical methods of estimating mining costs

    Science.gov (United States)

    Long, K.R.

    2011-01-01

    Until it was defunded in 1995, the U.S. Bureau of Mines maintained a Cost Estimating System (CES) for prefeasibility-type economic evaluations of mineral deposits and estimating costs at producing and non-producing mines. This system had a significant role in mineral resource assessments to estimate costs of developing and operating known mineral deposits and predicted undiscovered deposits. For legal reasons, the U.S. Geological Survey cannot update and maintain CES. Instead, statistical tools are under development to estimate mining costs from basic properties of mineral deposits such as tonnage, grade, mineralogy, depth, strip ratio, distance from infrastructure, rock strength, and work index. The first step was to reestimate "Taylor's Rule" which relates operating rate to available ore tonnage. The second step was to estimate statistical models of capital and operating costs for open pit porphyry copper mines with flotation concentrators. For a sample of 27 proposed porphyry copper projects, capital costs can be estimated from three variables: mineral processing rate, strip ratio, and distance from nearest railroad before mine construction began. Of all the variables tested, operating costs were found to be significantly correlated only with strip ratio.

  14. NRMRL EVALUATES ACTIVE AND SEMI-PASSIVE TECHNOLOGIES FOR TREATING ACID MINE DRAINAGE

    Science.gov (United States)

    Two-page article describing three SITE demonstration projects underway on the Leviathan mine site in California. BiPhasic lime treatment, lime treatment lagoons and compost free BioReactors are being evaluated as innovative technologies for treating acid mine drainage.

  15. The Challenge of Integrating OHS into Industrial Project Risk Management: Proposal of a Methodological Approach to Guide Future Research (Case of Mining Projects in Quebec, Canada

    Directory of Open Access Journals (Sweden)

    Adel Badri

    2015-06-01

    Full Text Available Although risk management tools are put to good use in many industrial sectors, some large projects have been met with numerous problems due to failure to take occupational health and safety (OHS into consideration. In spite of the high level of risk and uncertainty associated with many industrial projects, the number of studies of methods for managing all known risks systematically remains small. Under effervescent economic conditions, industries must meet several challenges associated with frequent project start-ups. In highly complex and uncertain environments, rigorous management of risk remains indispensable for avoiding threats to the success of projects. Many businesses seek continually to create and improve integrated approaches to risk management. This article puts into perspective the complexity of the challenge of integrating OHS into industrial project risk management. A conceptual and methodological approach is proposed to guide future research focused on meeting this challenge. The approach is based on applying multi-disciplinary research modes to a complex industrial context in order to identify all scenarios likely to contain threats to humans or the environment. A case study is used to illustrate the potential of the proposed approach for application and its contribution to meeting the challenge of taking OHS into consideration. On-site researchers were able to develop a new approach that helped two mining companies in Quebec (Canada to achieve successful integration of OHS into expansion projects.

  16. IndexMed projects: new tools using the CIGESMED DataBase on Coralligenous for indexing, visualizing and data mining based on graphs

    OpenAIRE

    David , Romain; FERAL , Jean-Pierre; Archambeau , Anne; Bailly , Nicolas; Blanpain , Cyrille; Breton , Vincent; De Jode , Aurélie; Delavaud , Aurélie; Dias , Alrick; Gachet , Sophie; Guillemain , Dorian; Lecubin , Julien; Romier , Geneviève; Surace , Christian; Thierry De Ville D 'avray , Laure

    2016-01-01

    International audience; Data produced by the CIGESMED project (Coralligenous based Indicators to evaluate and monitor the "Good Environmental Status" of the MEDiterranean coastal waters) have a high potential for use by several stakeholders involved in environmental management. A new consortium called IndexMed whose task is to index Mediterranean biodiversity data, makes it possible to build graphs in order to analyse the CIGESMED data and develop new ways for data mining of coralligenous dat...

  17. Optimal sampling strategy for data mining

    International Nuclear Information System (INIS)

    Ghaffar, A.; Shahbaz, M.; Mahmood, W.

    2013-01-01

    Latest technology like Internet, corporate intranets, data warehouses, ERP's, satellites, digital sensors, embedded systems, mobiles networks all are generating such a massive amount of data that it is getting very difficult to analyze and understand all these data, even using data mining tools. Huge datasets are becoming a difficult challenge for classification algorithms. With increasing amounts of data, data mining algorithms are getting slower and analysis is getting less interactive. Sampling can be a solution. Using a fraction of computing resources, Sampling can often provide same level of accuracy. The process of sampling requires much care because there are many factors involved in the determination of correct sample size. The approach proposed in this paper tries to find a solution to this problem. Based on a statistical formula, after setting some parameters, it returns a sample size called s ufficient sample size , which is then selected through probability sampling. Results indicate the usefulness of this technique in coping with the problem of huge datasets. (author)

  18. Public views of reclaiming an abandoned coal mine: the Macoupin County project

    Energy Technology Data Exchange (ETDEWEB)

    Bernard, J. R.

    1980-07-01

    An abandoned underground coal mine waste area in Macoupin County, Illinois, has been reclaimed for demonstration and research purposes near the city of Staunton. According to federal law, end uses of reclaimed coal mines must be determined in part by local concerns. This study examined local residents' preferences for land uses and their social and economic evaluations of reclamation at the Macoupin County site. Personal interviews with 119 residents revealed preferences for recreational use of the demonstration area; however, responses were probably influenced by prior awareness of land-use intentions. Generally, very positive evaluations of the reclamation were received. Willingness to pay for reclamation appears to be linked to fulfillment of desired recreational uses on the site and socioeconomic status of the respondent. In general, the research results provide further evidence that the value of abatement of environmental damage from mining is recognized and supported in economic terms at the public level.

  19. Mine dewatering and impact assessment in an arid area: Case of Gulf region.

    Science.gov (United States)

    Yihdego, Yohannes; Drury, Len

    2016-11-01

    Analytical and empirical solution coupled with water balance method were used to predict the ground water inflow to a mine pit excavated below the water table, final pit lake level/recovery and radius of influence, through long-term and time variant simulations. The solution considers the effect of decreased saturated thickness near the pit walls, distributed recharge to the water table and upward flow through the pit bottom. The approach is flexible to accommodate the anisotropy/heterogeneity of the real world. Final pit void water level was assessed through scenarios to know whether it will be consumed by evaporation and a shallow lake will form or not. The optimised radius of influence was estimated which is considered as crucial information in relation to the engineering aspects of mine planning and sustainable development of the mine area. Time-transient inflow over a period of time was estimated using solutions, including analytical element method (AEM). Their primary value is in providing estimates of pit inflow rates to be used in the mine dewatering. Inflow estimation and recovery helps whether there is water to supplement the demand and if there is any recovery issue to be dealt with in relation to surface and groundwater quality/eco-system, environmental evaluations and mitigation. Therefore, this method is good at informing decision makers in assessing the effects of mining operations and developing an appropriate water management strategy.

  20. Ochre precipitates and Acid Mine Drainage in a mine environment

    Czech Academy of Sciences Publication Activity Database

    Máša, B.; Pulišová, Petra; Bezdička, Petr; Michalková, E.; Šubrt, Jan

    2012-01-01

    Roč. 56, č. 1 (2012), s. 9-14 ISSN 0862-5468 R&D Projects: GA MŠk(CZ) MEB0810136 Grant - others:Ministry of Education of the Slovak Republic(SK) VEGA 1/0529/09 Institutional research plan: CEZ:AV0Z40320502 Keywords : ochre precipitate * Acid Mine Drainage (AMD) * X-ray diffraction analysis (XRD) * Scanning electron microscopy (SEM) * specific surface area and porosity Subject RIV: CA - Inorganic Chemistry Impact factor: 0.418, year: 2012

  1. Uranium ISR Mine Closure — General Concepts and Model-Based Simulation of Natural Attenuation for South-Australian Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Jeuken, B.; Märten, H.; Woods, P., E-mail: horst.maerten@heathgate.com.au [Heathgate Resources Pty. Ltd. (Heathgate), Adelaide (Australia); Kalka, H.; Nicolai, J. [Umwelt- und Ingenieurtechnik GmbH Dresden (UIT), Dresden (Germany)

    2014-05-15

    Heathgate has demonstrated the effect of natural attenuation (NA) in post in-situ recovery (ISR) aquifer regions during the operation of the Beverley mine since 2001. Enhanced natural attenuation (ENA) has been considered as the key component of the mine closure concept for the new Beverley Four Mile (BFM) project, complemented by an extensive monitoring program. Data from batch and column tests for BFM core samples was used to calibrate a reactive transport model, whose application in conjunction with the hydrological modelling of the BFM aquifer has shown that NA will result in the restoration of the aquifer in time. ENA within a staged mine development program under the site-specific circumstances is discussed. (author)

  2. Determination of radon and progeny concentrations in Brazilian underground mines

    International Nuclear Information System (INIS)

    Fraenkel, Mario O.; Gouvea, Vandir de Azevedo; Macacini, Jose F.; Cardozo, Katia; Carvalho Filho, Carlos A. de; Lima, Carlos E.

    2008-01-01

    The aim of this work is to present the activities related to the determination of radon and progeny concentrations in underground mines in Brazil. Radon is originated from decay of radium-226 and radium-228 present in rocks. Radon and its short-lived progeny can be retained in the workers pulmonary alveoli, and this way they bring about cancer risk to these mining professionals. The occurrence of high radon concentrations in underground coal and copper mines and the lack of systematic survey motivated CNEN, the regulatory agency, to develop the Radon Project, aiming to aid the formulation of a specific regulation with occupational dose limits consistent with international standards recommended by the International Atomic Energy Agency (IAEA). Dozens of underground mines are currently in operation in the national. It had to be noted that about 50% of these mines are located in Minas Gerais province, and for this reason it was chosen to start the Project. In each underground mine it is installed in selected points passive nuclear track etch radon detectors, type LEXAN and Cr-39, for periods from three to five months. It was also made local measurements with Dose Man Pro detectors from SARAD. The points are chosen according to geological features, radiometric activity and characteristics of prospect development. The determination of radon present in mines has been made in IEN (Nuclear Engineering Institute)/Rio de Janeiro-RJ, LAPOC (Pocos de Caldas Laboratory)/Pocos de Caldas-MG e ESPOA (Porto Alegre Office)/Porto Alegre-RS. Until now it was visited about 35 mines in a universe of about 50 mines, from which 20% showed concentration values higher than international limits (ICRP 65), between 500 and 1500 Bq.m -3 . (author)

  3. Landfill mining: Development of a cost simulation model.

    Science.gov (United States)

    Wolfsberger, Tanja; Pinkel, Michael; Polansek, Stephanie; Sarc, Renato; Hermann, Robert; Pomberger, Roland

    2016-04-01

    Landfill mining permits recovering secondary raw materials from landfills. Whether this purpose is economically feasible, however, is a matter of various aspects. One is the amount of recoverable secondary raw material (like metals) that can be exploited with a profit. Other influences are the costs for excavation, for processing the waste at the landfill site and for paying charges on the secondary disposal of waste. Depending on the objectives of a landfill mining project (like the recovery of a ferrous and/or a calorific fraction) these expenses and revenues are difficult to assess in advance. This situation complicates any previous assessment of the economic feasibility and is the reason why many landfills that might be suitable for landfill mining are continuingly operated as active landfills, generating aftercare costs and leaving potential hazards to later generations. This article presents a newly developed simulation model for landfill mining projects. It permits identifying the quantities and qualities of output flows that can be recovered by mining and by mobile on-site processing of the waste based on treatment equipment selected by the landfill operator. Thus, charges for disposal and expected revenues from secondary raw materials can be assessed. Furthermore, investment, personnel, operation, servicing and insurance costs are assessed and displayed, based on the selected mobile processing procedure and its throughput, among other things. For clarity, the simulation model is described in this article using the example of a real Austrian sanitary landfill. © The Author(s) 2016.

  4. Development and Validation of an Acid Mine Drainage Treatment Process for Source Water

    Energy Technology Data Exchange (ETDEWEB)

    Lane, Ann [Battelle Memorial Institute, Columbus, OH (United States)

    2016-03-01

    Throughout Northern Appalachia and surrounding regions, hundreds of abandoned mine sites exist which frequently are the source of Acid Mine Drainage (AMD). AMD typically contains metal ions in solution with sulfate ions which have been leached from the mine. These large volumes of water, if treated to a minimum standard, may be of use in Hydraulic Fracturing (HF) or other industrial processes. This project’s focus is to evaluate an AMD water treatment technology for the purpose of providing treated AMD as an alternative source of water for HF operations. The HydroFlex™ technology allows the conversion of a previous environmental liability into an asset while reducing stress on potable water sources. The technology achieves greater than 95% water recovery, while removing sulfate to concentrations below 100 mg/L and common metals (e.g., iron and aluminum) below 1 mg/L. The project is intended to demonstrate the capability of the process to provide AMD as alternative source water for HF operations. The second budget period of the project has been completed during which Battelle conducted two individual test campaigns in the field. The first test campaign demonstrated the ability of the HydroFlex system to remove sulfate to levels below 100 mg/L, meeting the requirements indicated by industry stakeholders for use of the treated AMD as source water. The second test campaign consisted of a series of focused confirmatory tests aimed at gathering additional data to refine the economic projections for the process. Throughout the project, regular communications were held with a group of project stakeholders to ensure alignment of the project objectives with industry requirements. Finally, the process byproduct generated by the HydroFlex process was evaluated for the treatment of produced water against commercial treatment chemicals. It was found that the process byproduct achieved similar results for produced water treatment as the chemicals currently in use. Further

  5. Mining with microbes

    International Nuclear Information System (INIS)

    Rawlings., D.E.; Silver, S.

    1995-01-01

    Microbes are playing increasingly important roles in commercial mining operations, where they are being used in the open-quotes bioleachingclose quotes of copper, uranium, and gold ores. Direct leaching is when microbial metabolism changes the redox state of the metal being harvested, rendering it more soluble. Indirect leaching includes redox chemistry of other metal cations that are then coupled in chemical oxidation or reduction of the harvested metal ion and microbial attack upon and solubilization of the mineral matrix in which the metal is physically embedded. In addition, bacterial cells are used to detoxify the waste cyanide solution from gold-mining operations and as open-quotes absorbantsclose quotes of the mineral cations. Bacterial cells may replace activated carbon or alternative biomass. With an increasing understanding of microbial physiology, biochemistry and molecular genetics, rational approaches to improving these microbial activities become possible. 40 refs., 3 figs

  6. Scientific investigations accompanying recultivation of abandoned lignite mines in East Germany. Research projects 1994 through 2000; Wissenschaftliche Begleitung der ostdeutschen Braunkohlesanierung. Forschungsprojekte 1994 bis 2000

    Energy Technology Data Exchange (ETDEWEB)

    Gockel, G.; Hildmann, E.; Schlenstedt, J.; Schreiber, M. (comps.)

    2001-07-01

    From 1990 the reduction of lignite mining on the territory of the German Democratic Republic (GDR) led to the closure of plants for the production and processing of lignite. This entailed a dramatic demand of redevelopment and transformation of former mining and industrial areas of lignite industry and the creation of the industrial branch of remediation of post-lignite-mining areas, for which suitable structures of management and financing had to be found. The target of these endeavours is the creation of multifunctional to follow former surface mining areas. Ecological and security criteria play an eminent part in this process. Stabilising slopes, recultivation, rehabilitation of a balanced water regime and the elimination of dangers emanating from groundwater and soil contamination by earlier industrial use have particular priority. Recultivation requires scientific preparation and surveillance. Deficits are discussed that have led to the invitation of tenders for a promotion initiative and resulted in the implementation of a number of research projects. This publication deals with the presentation of the tasks and research approaches as well as the description and evaluation of results with the view of their applicability. (orig.)

  7. Solar Data Mining at Georgia State University

    Science.gov (United States)

    Angryk, R.; Martens, P. C.; Schuh, M.; Aydin, B.; Kempton, D.; Banda, J.; Ma, R.; Naduvil-Vadukootu, S.; Akkineni, V.; Küçük, A.; Filali Boubrahimi, S.; Hamdi, S. M.

    2016-12-01

    In this talk we give an overview of research projects related to solar data analysis that are conducted at Georgia State University. We will provide update on multiple advances made by our research team on the analysis of image parameters, spatio-temporal patterns mining, temporal data analysis and our experiences with big, heterogeneous solar data visualization, analysis, processing and storage. We will talk about up-to-date data mining methodologies, and their importance for big data-driven solar physics research.

  8. Reference Design Project Book: NUSEL-Homestake

    OpenAIRE

    Haxton, W. C.

    2003-01-01

    This submission includes the overview, science timeline, reference design, WBS, and mine status sections of the Homestake collaboration's Reference Design Project Book. The Project Book describes the specific plan for converting the Homestake Gold Mine into a facility for physics, earth science, and engineering. The proposed developments on the 7400- and 4850-ft levels are presented, along with the plans for adapting Homestake's existing infrastructure for science. The plan differs substantia...

  9. Cleaning-up abandoned uranium mines in Saskatchewan's North

    International Nuclear Information System (INIS)

    Schramm, L.L.

    2012-01-01

    Thirty-six now-abandoned uranium mine and mill sites were developed and operated on or near Lake Athabasca, in Northern Saskatchewan, Canada, from approximately 1957 through 1964. During their operating lifetimes these mines produced large quantities of ore and tailings. After closure in the 1960's, these mine and mill sites were abandoned with little remediation and no reclamation being done. The governments of Canada and Saskatchewan are now funding the cleanup of these abandoned northern uranium mine and mill sites and have contracted the management of the project to the Saskatchewan Research Council (SRC). The clean-up activity is underway, with work at many of the smaller sites largely completed, work at the Gunnar site well underway, and a beginning made at the Lorado site. This lecture presents an overview of these operations. (author)

  10. ThaleMine: A Warehouse for Arabidopsis Data Integration and Discovery.

    Science.gov (United States)

    Krishnakumar, Vivek; Contrino, Sergio; Cheng, Chia-Yi; Belyaeva, Irina; Ferlanti, Erik S; Miller, Jason R; Vaughn, Matthew W; Micklem, Gos; Town, Christopher D; Chan, Agnes P

    2017-01-01

    ThaleMine (https://apps.araport.org/thalemine/) is a comprehensive data warehouse that integrates a wide array of genomic information of the model plant Arabidopsis thaliana. The data collection currently includes the latest structural and functional annotation from the Araport11 update, the Col-0 genome sequence, RNA-seq and array expression, co-expression, protein interactions, homologs, pathways, publications, alleles, germplasm and phenotypes. The data are collected from a wide variety of public resources. Users can browse gene-specific data through Gene Report pages, identify and create gene lists based on experiments or indexed keywords, and run GO enrichment analysis to investigate the biological significance of selected gene sets. Developed by the Arabidopsis Information Portal project (Araport, https://www.araport.org/), ThaleMine uses the InterMine software framework, which builds well-structured data, and provides powerful data query and analysis functionality. The warehoused data can be accessed by users via graphical interfaces, as well as programmatically via web-services. Here we describe recent developments in ThaleMine including new features and extensions, and discuss future improvements. InterMine has been broadly adopted by the model organism research community including nematode, rat, mouse, zebrafish, budding yeast, the modENCODE project, as well as being used for human data. ThaleMine is the first InterMine developed for a plant model. As additional new plant InterMines are developed by the legume and other plant research communities, the potential of cross-organism integrative data analysis will be further enabled. © The Author 2016. Published by Oxford University Press on behalf of Japanese Society of Plant Physiologists. All rights reserved. For permissions, please email: journals.permissions@oup.com.

  11. Land degradation due to open cast mines-a case study

    International Nuclear Information System (INIS)

    Dubey, Ashutosh; Nath, R.

    1998-01-01

    The contribution of open cast mines is increasing day by day in coal production. These open cast mines have direct and visible impacts on land surface. During mining stage, land is damaged and degraded. Excavation of coal and overburden dumping along with other infrastructural development is responsible for this damage and degradation. Impact of land degradation is observed as loss of forest cover, reduction and extinction of wildlife, reduction of agricultural land, destruction of geologic column, soil erosion, hydrological imbalance, socioeconomic problems, etc. in active mining areas. The present paper discusses the extent and impact of land degradation by open cast mining activity in Singrauli coal field. The paper also highlights the extent of land degradation particularly in one of the open cast mining projects of Singrauli coal field. It also suggests certain control measures to minimise the problem. (author)

  12. Active mines in Arizona - 1993. Directory 40

    International Nuclear Information System (INIS)

    Phillips, K.A.; Niemuth, N.J.; Bain, D.R.

    1992-01-01

    A directory of the active mines in Arizona is presented. The directory was compiled in November, 1992 from field visits and information received by the Department's technical staff. For the purpose of this directory, an active mine is defined as a mine in continuous operation, either in production or under full-time development for production. Custom milling operations that are active or available on a full-time basis are also included in the directory. It is acknowledged that there are additional mines not listed that are in an exploration, evaluation, or part-time development phase. There are others where production is on an intermittent basis that are not listed. The report is dependent on the cooperation of government agencies, private industry, and individuals who voluntarily provide information on their projects and activities. The directory is arranged alphabetically by company name. Each listing includes corporate addresses, mine name and location, operation description, and key personnel. The listing for the sand and gravel operations include name, address, and phone number

  13. Uranium exploration, mining and ore enrichment techniques

    International Nuclear Information System (INIS)

    Fuchs, H.D.; Wentzlau, D.

    1985-01-01

    The paper describes the different types of uranium deposits and their importance. It is shown that during the present depressed uranium market situation, mainly high grade deposits such as unconformity-related deposits can be mined economically. The different successive exploration steps are outlined including methods used for uranium. Uranium mining does not greatly differ from normal mining, but the uranium metallurgy needs its own specialized but already classic technology. Only a relative small amount of uranium can be expected from projects where uranium is produced by in situ leach methods or by extraction from phosphoric acid. A short summary of investment costs and operating costs is given for an average uranium mine. The last chapter deals with the definition of different reserve categories and outlines the uranium reserves of the western world including the uranium production (1983) and the expected uranium production capacity for 1985 and 1990. (orig.) [de

  14. Remediation of acid mine drainage from the Santa Fe tin mine, Bolivia

    Science.gov (United States)

    Calvo, Daniel; Zamora Echenique, Gerardo; Alfonso, Pura; Casado, Jordi; Trujillo, Elvys; Jiménez-Franco, Abigail; Garcia-Valles, Maite

    2015-04-01

    The Santa Fe mine, department of Oruro, is located in the Andean Tin belt, is exploited for tin, zinc, lead and silver. This in an underground mine mined up to the -108 level. Today it is only mined up to the -50 level. Under this level the table water covers the mine. Water reaches the surface with a very acidic composition, with a high content in potentially toxic elements. This water drains directly to the Santa Fe River and contribute to the pollution present in this river that directly affect to the aquatic communities. In addition, population of this area have problems in the supply of drinking water, so remediation by obtaining cleaning water is a priority for this area. This study presents a neutralization-precipitation treatment with lime to the acid water inside the mine. The ore mineralogy of the Santa Fe mined deposit consists mainly in cassiterite, pyrite, sphalerite, galena, arsenopyrite argentite and sulphosalts. The host mineral is mainly quartz, with a minor content in feldspars and tourmaline. Alteration minerals as alunite, goethite and pumbojarosite are abundant and indicate the occurrence of reactions that lead to the formation of acid mine drainage. The mean pH of water drained from the Santa Fe mine is 2.2 and chemical analyses show high contents in potentially toxic elements: 27-295 ppm Zn, 0.05-0.2 ppm Pb, 0.06-0.09 ppm Cd, 04-0.12 ppm Cu, 113-165 ppm Fe, 4 ppm Mn and 564-664 ppm S. As and Sb were under 0.5 ppm. A settler tank inside the mine was designed by means of seal a selected gallery to clean the mine water. The function of this gallery is to sediment the sludge resulting from the neutralization - precipitation treatment process to obtain a clear water overflow continuously to the outside. The neutralization tests indicate that 0.65g/L of lime and 2ml of flocculant should be added to neutralize water up to pH 6-7. A flow rate of 80 L /s was considered. After a geotechnical study, a chamber located in the mine was selected to locate

  15. From old lignite mining pits to new lakes. The example of rehabilitation of the former open-cast mining facilities at Berzdorf, Germany; Von alten Gruben zu neuen Seen am Beispiel des Tagebaues Berzdorf

    Energy Technology Data Exchange (ETDEWEB)

    Kolba, Manfred [LMBV mbH, Sanierungsbereich Lausitz, Senftenberg (Germany)

    2009-09-15

    The Lausitz and Central-German Mining Administration Company (LMBV) is project executor for the largest landscaping construction site in Europe. LMBV rehabilitates former open-cast mining facilities, as well as decommissioned coal-upgrading plants, to provide promising future areas for industrial complexes, and for landscapes that will attract a great number and variety of tourism developments. LMBV executes projects for the elimination of dangers as a result of the rising of groundwater to its former and natural level. In this context, the German Federal States involved in past and present lignite mining support extensive measures for enhancement of the standard of future use at the new lakes in Central Germany and in the Lausitz Region. This presentation shows the rehabilitation activities of LMBV as project executor in a great range of activities, by explaining the rehabilitation and transformation of the former lignite mining facilities in Berzdorf, Germany, in creation of the future Berzdorf Lake. (orig.)

  16. IBM SPSS modeler essentials effective techniques for building powerful data mining and predictive analytics solutions

    CERN Document Server

    McCormick, Keith; Wei, Bowen

    2017-01-01

    IBM SPSS Modeler allows quick, efficient predictive analytics and insight building from your data, and is a popularly used data mining tool. This book will guide you through the data mining process, and presents relevant statistical methods which are used to build predictive models and conduct other analytic tasks using IBM SPSS Modeler. From ...

  17. Treatment of the acid mine drainage residue for uranium recovery

    International Nuclear Information System (INIS)

    Dias, M.M.; Horta, D.G.; Fukuma, H.T.; Villegas, R.A.S.; Carvalho, C.H.T. de; Silva, A.C. da

    2017-01-01

    Acid mine drainage (AMD) is a process that occurs in many mining that have sulfide ores. With water and oxygen, several metals are oxidized, one example being uranium. At the mine pit of the Osamu Utsumi Mine located at INB - Caldas and in two other boot-wastes (mining waste pile), AMD is present and currently, without a technological solution. The acidic water present in the pit is treated with hydrated lime, generating water for disposal and an alkaline residue called calcium diuranate - DUCA. The DUCA has a concentration of approximately 0.32% U 3 O 8 , which makes interesting the development of a process for extracting that metal. One of the processes that can be used is leaching. For this study, it was decided to evaluate the alkaline leaching to extract the uranium present in the residue. It is necessary to optimize operational parameters for the process: percentage of solids, concentration of leaching agent in solution, temperature and reaction time. With these parameters, it is possible to improve the leaching so that the largest amount of uranium is extracted from the sample, to help solve the environmental impact caused by the wastewater from the treatment of acid waters and, in addition, to give an economical destination for this metal that is contained in the deposited DUCA

  18. An intelligent hybrid system for surface coal mine safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Lilic, N.; Obradovic, I.; Cvjetic, A. [University of Belgrade, Belgrade (Serbia)

    2010-06-15

    Analysis of safety in surface coal mines represents a very complex process. Published studies on mine safety analysis are usually based on research related to accidents statistics and hazard identification with risk assessment within the mining industry. Discussion in this paper is focused on the application of AI methods in the analysis of safety in mining environment. Complexity of the subject matter requires a high level of expert knowledge and great experience. The solution was found in the creation of a hybrid system PROTECTOR, whose knowledge base represents a formalization of the expert knowledge in the mine safety field. The main goal of the system is the estimation of mining environment as one of the significant components of general safety state in a mine. This global goal is subdivided into a hierarchical structure of subgoals where each subgoal can be viewed as the estimation of a set of parameters (gas, dust, climate, noise, vibration, illumination, geotechnical hazard) which determine the general mine safety state and category of hazard in mining environment. Both the hybrid nature of the system and the possibilities it offers are illustrated through a case study using field data related to an existing Serbian surface coal mine.

  19. Securing the future of the Lusatian lignite mining; Zukunftssicherung im Lausitzer Revier

    Energy Technology Data Exchange (ETDEWEB)

    Klocek, Gert [Vattenfall Europe Mining AG, Cottbus (Germany). Bergbauplanung; Ketzmer, Wolfgang [Vattenfall Europe Mining AG, Cottbus (Germany). Grunddaten und Bergtechnik

    2014-11-01

    In the course of securing the future of the Lusatian lignite mining, the company has initiated several measures and activities. Thus with large-scale projects such as relocating the operating and surface facilities of the Welzow-Sued opencast mine uninterrupted long-term mining advance is ensured. The company's lignite-fired power plants with their project ''FlexGen'', to further increased flexibility, enhances their position to master of the challenges of ''Energiewende''. The political and societal framework for this complex development is in line with the climate and energy programmes or strategies of the Free State of Saxony and the federal state of Brandenburg.

  20. Hydrogeologic and stratigraphic data pertinent to uranium mining, Cheyenne Basin, Colorado. Information series 12

    International Nuclear Information System (INIS)

    Kirkham, R.M.; O'Leary, W.; Warner, J.W.

    1980-01-01

    Recoverable low-grade uranium deposits occur in the Upper Cretaceous Fox Hills Sandstone and Laramie Formation in the Cheyenne Basin, Colorado. One of these deposits, the Grover deposit, has been test mined on a pilot scale using in-situ solution-mining techniques. A second deposit, the Keota deposit, is currently being licensed and will produce about 500,000 lb/yr (227,000 kg/yr) of yellowcake also using in-situ solution-mining techniques. Other uranium deposits exist in this area and will also probably be solution mined, although open-pit mining may possibly be employed at a few locations in the Cheyenne Basin. One of the principal environmental impacts of this uranium-mining activity is the potential effect on ground-water quality and quantity. In order to fully assess potential ground-water impacts, regulatory agencies and mine planners and operators must be familiar with regional geologic and hydrologic characteristics of the basin. The Oligocene White River Group and Upper Cretaceous Laramie Formation, Fox Hills Sandstone, and Pierre Shale contain important aquifers which supply water for domestic, stock-watering, irrigation, and municipal purposes in the study area. Should uranium mining seriously impact shallower aquifers, the upper Pierre and lower Fox Hills aquifers may become important sources of water. Water samples collected and analyzed from over 100 wells during this investigation provide baseline water-quality data for much of the study area. These analyses indicate water quality is highly variable not only between aquifers, but also within a particular aquifer. Many of the wells yield water that exceeds US Public Health drinking water standards for pH, TDS, sulfate, manganese, iron and selenium. Uranium, molybdenum, and vanadium concentrations are also high in many of these wells. 8 figures