WorldWideScience

Sample records for solenoid operates underground

  1. ATLAS solenoid operates underground

    CERN Multimedia

    2006-01-01

    A new phase for the ATLAS collaboration started with the first operation of a completed sub-system: the Central Solenoid. Teams monitoring the cooling and powering of the ATLAS solenoid in the control room. The solenoid was cooled down to 4.5 K from 17 to 23 May. The first current was established the same evening that the solenoid became cold and superconductive. 'This makes the ATLAS Central Solenoid the very first cold and superconducting magnet to be operated in the LHC underground areas!', said Takahiko Kondo, professor at KEK. Though the current was limited to 1 kA, the cool-down and powering of the solenoid was a major milestone for all of the control, cryogenic, power and vacuum systems-a milestone reached by the hard work and many long evenings invested by various teams from ATLAS, all of CERN's departments and several large and small companies. Since the Central Solenoid and the barrel liquid argon (LAr) calorimeter share the same cryostat vacuum vessel, this achievement was only possible in perfe...

  2. First Operation of the Central Solenoid

    CERN Multimedia

    Ruber, R.

    2006-01-01

    A new phase for the ATLAS collaboration started with the first operation of a completed sub-system: the Central Solenoid. It was cooled down from the 17th to 23th May 2006, and the first kA was put into it the same evening as it was cold and superconductive. That makes our solenoid the very first cold and superconducting magnet to be operated in the LHC underground areas. The Central Solenoid in its final position at the heart of ATLAS. The coil current (red line) and voltage (blue line) showing the operation at nominal current of 7.73 kA for a magnetic field of 2.0 T and the subsequent successful commissioning up to 8 kAT The cool down and powering of the solenoid was a major milestone for all control, cryogenic, power and vacuum systems and was achieved in perfect collaboration with the liquid argon detector with which it shares the Barrel Cryostat. Powering up to nominal current had to wait until the last week of July when the End-Cap Calorimeters were in closed position. The Tile Barrel and E...

  3. Operating experience feedback report - Solenoid-operated valve problems

    International Nuclear Information System (INIS)

    Ornstein, H.L.

    1991-02-01

    This report highlights significant operating events involving observed or potential common-mode failures of solenoid-operated valves (SOVs) in US plants. These events resulted in degradation or malfunction of multiple trains of safety systems as well as of multiple safety systems. On the basis of the evaluation of these events, the Office for Analysis and Evaluation of Operational Data (AEOD) of the US Nuclear Regulatory Commission (NRC) concludes that the problems with solenoid-operated valves are an important issue that needs additional NRC and industry attention. This report also provides AEOD's recommendations for actions to reduce the occurrence of SOV common-mode failures. 115 refs., 7 figs., 2 tabs

  4. Underground mining operation supports

    Energy Technology Data Exchange (ETDEWEB)

    Khusid, M.B.; Kozel, A.M.

    1980-12-10

    Underground mining operation supports include the supporting layer surrounded by a cylindrical jacket of cemented rock. To decrease the loss of support material due to the decreasing rock pressure on the supporting layer, the cylindrical jacket of cemented rock has an uncemented layer inside, dividing it into 2 concentric cylindrical parts.

  5. Down with Physics: giant compact muon solenoid (CMS) magnet goes underground at CERN UCR physicists to participate in the international experiment

    CERN Multimedia

    2007-01-01

    "Scientists of the US CMS collaboration, which includes UC riverside physicists, joined colleagues around the world in announcing today that the heaviest piece of the Compact Muon Solenoid particle detector has begun te momentous journey into its experimenta cavern 100 meters underground." (2,5 pages)

  6. Ultimate Performance of the ATLAS Superconducting Solenoid

    CERN Document Server

    Ruber, R; Kawai, M; Kondo, Y; Doi, Y; Haruyama, T; Haug, F; Kate, H ten; Kondo, T; Pirotte, O; Metselaar, J; Mizumaki, S; Olesen, G; Sbrissa, E; Yamamoto, A

    2007-01-01

    A 2 tesla, 7730 ampere, 39 MJ, 45 mm thin superconducting solenoid with a 2.3 meters warm bore and 5.3 meters length, is installed in the center of the ATLAS detector and successfully commissioned. The solenoid shares its cryostat with one of the detector's calorimeters and provides the magnetic field required for the inner detectors to accurately track collision products from the LHC at CERN. After several years of a stepwise construction and test program, the solenoid integration 100 meters underground in the ATLAS cavern is completed. Following the on-surface acceptance test, the solenoid is now operated with its final cryogenic, powering and control system. A re-validation of all essential operating parameters is completed. The performance and test results of underground operation are reported and compared to those previously measured.

  7. 40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.

    Science.gov (United States)

    2010-07-01

    ... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...

  8. The Compact Muon Solenoid silicon tracker testing of hybrids, modules and substructures at operating temperature

    CERN Document Server

    Pottgens, M

    2004-01-01

    The Compact Muon Solenoid (CMS) is one of two general purpose detectors which are foreseen to operate at the Large Hadron Collider (LHC), which is presently being built at the European laboratory for particle physics (CERN) in Switzerland. The central tracker of CMS consists of a pixel system, which is located close to the interaction point and a silicon strip tracker (SST) which instruments the intermediate and outer region. The SST is composed of 15148 silicon microstrip detector modules which contain the read-out electronics (hybrids) and sensors. These modules will be assembled into substructures with control electronics and optics for transmitting data. The substructures will be integrated into the subsystems of the SST. The SST will be operated for up to ten years in the harsh radiation environment of the LHC. The lifetime of the SST will be extended by operating the detector at lowered temperature. The sensors, which are very delicate parts in respect to radiation damage, will be operated at a maximum ...

  9. The Study on the Alternative Plan for the Soft Seals of Solenoid Operated Valves

    International Nuclear Information System (INIS)

    Lee, Jun; Seo, J. K.; Park, C. T.; Ryu, S. Y.; Yoon, Ju Hyeon

    2004-12-01

    The EPDM(Ethylene-Propylene-Diene rubber) sealed SOV(Solenoid Operated Valve)'s failures had occurred several times. The EPDM has a relatively low thermal resistance which lead to the failures. The objective of the study is to present the alternative plan for the soft seals to be required to be worked without leading to the SOV's failures during a long term in the high temperature circumference. The maximum allowable temperature at continuous service, 10,000 hr, of Viton was investigated that is about 50 .deg. C higher than EPDM. The maximum allowable temperature of Kalrez was investigated that is each about 150 .deg. C and 100 .deg. C higher than EPDM and Viton. Also, it was investigated that Kalrez retains its sealing force longer due to its excellent thermal resistance, and has a relatively low compression set, as compared with fluoroelastomer types. In order to not lead to the soft sealed SOV's failures during a long term in the high temperature circumference, it is required that the system variables as the operating temperature and its exposed time should be estimated correctly, and together that the soft seals suitable much for the system variables should be selected. If the soft seals suitable much for the system variables are selected, we could lower the probabilities of the soft sealed SOV's failures, and could prolong the in-service testing duration and continue to operate the system without interruption

  10. Proceedings of the 6th underground operators conference

    International Nuclear Information System (INIS)

    Golosinski, T.S.

    1995-01-01

    This conference presents recent development in underground mining operations. A large number of papers reported on underground mining practice in the Eastern Goldfields area of Western Australia and in the traditional mining centres of Mount Isa and Broken Hill. These are supplemented by papers reporting on other underground mining developments all throughout Australia and in several overseas countries known for advanced mining expertise. Apart from papers dealing with metalliferous mining, a number of papers related to coal mining present recent developments related to the topic. The papers are grouped into sessions relating to ground control, rock mechanics, management and human resources, mining methods, mining equipment, control and communications, mine backfill, mining operations, drilling and blasting and coal mining. Relevant papers have been individually indexed/abstracted. Tabs., figs., refs

  11. LCLS Gun Solenoid Design Considerations

    International Nuclear Information System (INIS)

    Schmerge, John

    2010-01-01

    The LCLS photocathode rf gun requires a solenoid immediately downstream for proper emittance compensation. Such a gun and solenoid have been operational at the SSRL Gun Test Facility (GTF) for over eight years. Based on magnetic measurements and operational experience with the GTF gun solenoid multiple modifications are suggested for the LCLS gun solenoid. The modifications include adding dipole and quadrupole correctors inside the solenoid, increasing the bore to accommodate the correctors, decreasing the mirror plate thickness to allow the solenoid to move closer to the cathode, cutouts in the mirror plate to allow greater optical clearance with grazing incidence cathode illumination, utilizing pancake coil mirror images to compensate the first and second integrals of the transverse fields and incorporating a bipolar power supply to allow for proper magnet standardization and quick polarity changes. This paper describes all these modifications plus the magnetic measurements and operational experience leading to the suggested modifications.

  12. Multiattribute prediction of terrain stability above underground mining operations

    Directory of Open Access Journals (Sweden)

    Vujić Slobodan

    2011-01-01

    Full Text Available This paper is dedicated to the problem of stability prediction of the terrain above underground mining operations. After the initial introduction to the problem, then the short analysis of the model approaches used to solve it, and giving the algorithm for rock massif stability prediction, we describe the concept of the multiattirbute terrain stability prediction method. The application of the multiattribute prediction method for stability of the terrain above underground mining operations is presented on the example of the Brown Coal Mine Aleksinac. The used method is original, essentially different from the other methods of mathematical modeling, because its prognosis of the rock massif stability under the influence of underground mining operations is based on the balance of the stability indicators. Our comparative analysis of the results obtained by multiattribute prediction and the data obtained by measurements of real deformations and terrain settling in multiple mines shows high mutual correlation, with an average deviation of less than ±10%. These results are confirmed entirely on the example of the Brown Coal Mine Aleksinac.

  13. 43 CFR 20.402 - Interests in underground or surface coal mining operations.

    Science.gov (United States)

    2010-10-01

    ... Certain Employees of the Department § 20.402 Interests in underground or surface coal mining operations...) Indirect financial interest in underground or surface coal mining operations means the same financial... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Interests in underground or surface coal...

  14. Method of operator safety assessment for underground mobile mining equipment

    Directory of Open Access Journals (Sweden)

    Działak Paulina

    2018-01-01

    Full Text Available The paper presents a method of assessing the safety of operators of mobile mining equipment (MME, which is adapted to current and future geological and mining conditions. The authors focused on underground mines, with special consideration of copper mines (KGHM. As extraction reaches into deeper layers of the deposit it can activate natural hazards, which, thus far, have been considered unusual and whose range and intensity are different depending on the field of operation. One of the main hazards that affect work safety and can become the main barrier in the exploitation of deposits at greater depths is climate threat. The authors have analysed the phenomena which may impact the safety of MME operators, with consideration of accidents that have not yet been studied and are not covered by the current safety standards for this group of miners. An attempt was made to develop a method for assessing the safety of MME operators, which takes into account the mentioned natural hazards and which is adapted to current and future environmental conditions in underground mines.

  15. Method of operator safety assessment for underground mobile mining equipment

    Science.gov (United States)

    Działak, Paulina; Karliński, Jacek; Rusiński, Eugeniusz

    2018-01-01

    The paper presents a method of assessing the safety of operators of mobile mining equipment (MME), which is adapted to current and future geological and mining conditions. The authors focused on underground mines, with special consideration of copper mines (KGHM). As extraction reaches into deeper layers of the deposit it can activate natural hazards, which, thus far, have been considered unusual and whose range and intensity are different depending on the field of operation. One of the main hazards that affect work safety and can become the main barrier in the exploitation of deposits at greater depths is climate threat. The authors have analysed the phenomena which may impact the safety of MME operators, with consideration of accidents that have not yet been studied and are not covered by the current safety standards for this group of miners. An attempt was made to develop a method for assessing the safety of MME operators, which takes into account the mentioned natural hazards and which is adapted to current and future environmental conditions in underground mines.

  16. Aging and service wear of solenoid-operated valves used in safety systems of nuclear power plants: Volume 1, Operating experience and failure identification

    Energy Technology Data Exchange (ETDEWEB)

    Bacanskas, V.P.; Roberts, G.C.; Toman, G.J.

    1987-03-01

    An assessment of the types and uses of solenoid-operated valves (SOVs) in nuclear power plant safety-related service is provided. Through a description of each SOV's operation, combined with knowledge of nuclear power plant applications and operational occurrences, the significant stressors responsible for degradation of SOV performance are identified. A review of actual operating experience (failure data) leads to identification of potential nondestructive in-situ testing which, if properly developed, could provide the methodology for degradation monitoring of SOVs. Recommendations are provided for continuation of the study into the test methodology development phase.

  17. Central Solenoid

    CERN Multimedia

    2002-01-01

    The Central Solenoid (CS) is a single layer coil wound internally in a supporting cylinder housed in the cryostat of the Liquid Argon Calorimeter. It was successfully tested at Toshiba in December 2000 and was delivered to CERN in September 2001 ready for integration in the LAr Calorimeter in 2003. An intermediate test of the chimney and proximity cryogenics was successfully performed in June 2002.

  18. Development of a smart rock bolt for underground monitoring operations

    CSIR Research Space (South Africa)

    Moema, JS

    2003-07-01

    Full Text Available of magnetic methods in measuring the stress or microstructural transformation in an individual bolt in both laboratory and underground environment. The corrosion performance of the smart bolt alloy was evaluated in synthetic mine water and compared...

  19. Hydrologic resources management program and underground test area operable unit fy 1997

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D. F., LLNL

    1998-05-01

    This report present the results of FY 1997 technical studies conducted by the Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area Operable Unit (UGTA). The HRMP is sponsored by the US Department of Energy to assess the environmental (radiochemical and hydrologic) consequences of underground nuclear weapons testing at the Nevada Test Site.

  20. CLIC Detector Main Solenoid Design & Status Report

    CERN Document Server

    Gaddi, Andrea; Herve, Alain

    2012-01-01

    The magnet system for the CLIC Detector concepts is composed of the central solenoid in combination with the two forward anti-solenoids and the ancillary systems necessary for their operation, including the so-called push-pull scenario, allowing the quick exchange of the two detectors on the beam line. An overview of the design parameters of the detector main solenoids is presented hereafter.

  1. US Department of Energy DOE Nevada Operations Office, Nevada Test Site: Underground safety and health standards

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The Nevada Test Site Underground Safety and Health Standards Working Group was formed at the direction of John D. Stewart, Director, Nevada Test Site Office in April, 1990. The objective of the Working Group was to compile a safety and health standard from the California Tunnel Safety Orders and OSHA for the underground operations at the NTS, (excluding Yucca Mountain). These standards are called the NTS U/G Safety and Health Standards. The Working Group submits these standards as a RECOMMENDATION to the Director, NTSO. Although the Working Group considers these standards to be the most integrated and comprehensive standards that could be developed for NTS Underground Operations, the intent is not to supersede or replace any relevant DOE orders. Rather the intent is to collate the multiple safety and health references contained in DOE Order 5480.4 that have applicability to NTS Underground Operations into a single safety and heath standard to be used in the underground operations at the NTS. Each portion of the standard was included only after careful consideration by the Working Group and is judged to be both effective and appropriate. The specific methods and rationale used by the Working Group are outlined as follows: The letter from DOE/HQ, dated September 28, 1990 cited OSHA and the CTSO as the safety and health codes applicable to underground operations at the NTS. These mandated codes were each originally developed to be comprehensive, i.e., all underground operations of a particular type (e.g., tunnels in the case of the CTSO) were intended to be adequately regulated by the appropriate code. However, this is not true; the Working Group found extensive and confusing overlap in the codes in numerous areas. Other subjects and activities were addressed by the various codes in cursory fashion or not at all.

  2. US Department of Energy DOE Nevada Operations Office, Nevada Test Site: Underground safety and health standards

    International Nuclear Information System (INIS)

    1993-05-01

    The Nevada Test Site Underground Safety and Health Standards Working Group was formed at the direction of John D. Stewart, Director, Nevada Test Site Office in April, 1990. The objective of the Working Group was to compile a safety and health standard from the California Tunnel Safety Orders and OSHA for the underground operations at the NTS, (excluding Yucca Mountain). These standards are called the NTS U/G Safety and Health Standards. The Working Group submits these standards as a RECOMMENDATION to the Director, NTSO. Although the Working Group considers these standards to be the most integrated and comprehensive standards that could be developed for NTS Underground Operations, the intent is not to supersede or replace any relevant DOE orders. Rather the intent is to collate the multiple safety and health references contained in DOE Order 5480.4 that have applicability to NTS Underground Operations into a single safety and heath standard to be used in the underground operations at the NTS. Each portion of the standard was included only after careful consideration by the Working Group and is judged to be both effective and appropriate. The specific methods and rationale used by the Working Group are outlined as follows: The letter from DOE/HQ, dated September 28, 1990 cited OSHA and the CTSO as the safety and health codes applicable to underground operations at the NTS. These mandated codes were each originally developed to be comprehensive, i.e., all underground operations of a particular type (e.g., tunnels in the case of the CTSO) were intended to be adequately regulated by the appropriate code. However, this is not true; the Working Group found extensive and confusing overlap in the codes in numerous areas. Other subjects and activities were addressed by the various codes in cursory fashion or not at all

  3. BBUNS: Bluetooth Beacon-Based Underground Navigation System to Support Mine Haulage Operations

    Directory of Open Access Journals (Sweden)

    Jieun Baek

    2017-11-01

    Full Text Available A Bluetooth beacon-based underground navigation system (BBUNS was developed to identify the optimal haul road in an underground mine, track the locations of dump trucks, and display this information on mobile devices. A three-dimensional (3-D geographic information system (GIS database of the haul roads in an underground mine was constructed, and the travel time for each section was calculated. A GIS database was also constructed for 50 Bluetooth beacons that were installed along the haul roads. An Android-based BBUNS application was developed to visualize the current location of each dump truck and the optimal haul road to the destination on mobile devices, using the Bluetooth beacon system that was installed in the underground mine. Whenever the BBUNS recognized all of the Bluetooth beacons installed in the underground mine, it could provide the dump truck drivers with information on the current location and the two-dimensional (2-D and 3-D haul road properties. The operating time of each dump truck and the time spent on each unit task could be analyzed using recorded data on the times when Bluetooth beacon signals were recognized by the BBUNS. The underground mine navigation system that was developed in this study can contribute to the improvement of haul operation efficiency and productivity.

  4. Industrial hygiene support of underground operations at the Nevada Test Site

    International Nuclear Information System (INIS)

    Porter, P.F.

    1992-01-01

    The Industrial Hygiene Section of the Health Protection Department provides industrial hygiene support of underground operations at the Nevada Test Site. This report describes support operations and summarizes the industrial hygiene data collected from July 31, 1989 through June 30, 1991. Air quality data were collected by means of personnel sampling by active and passive techniques using various kinds of industrial hygiene instrumentation and through localized and general area monitoring. The data collected were used to evaluate underground air quality and quantity requirements; evaluate worker exposures to a variety of air contaminants; determine the applicability and effectiveness of personal protective equipment

  5. ATLAS's superconducting solenoid takes up position

    CERN Multimedia

    2004-01-01

    The ATLAS superconducting solenoid was moved to its final destination on 16 January. It has taken up position opposite the ATLAS liquid argon barrel cryostat, which will house the electromagnetic calorimeter. All that remains to do now is to slide it into the insulation vacuum, this will be done in the next few weeks. Built by Toshiba, under responsibility of KEK in Japan, the central solenoid is 2.4 metres in diameter, 5.3 metres long and weighs 5.5 tonnes. "It will provide an axial magnetic field of 2 Tesla that will deflect particles inside the inner detector," as Roger Ruber, on-site project coordinator, explains. The inner detector, which consists of three sub-detectors, will be installed inside the solenoid later. The solenoid during one of the transport operations. Securely attached to the overhead travelling crane, the solenoid is situated in front of the opening to the liquid argon calorimeter, it will be inserted soon.

  6. Embedded Solenoid Transformer for Power Conversion

    DEFF Research Database (Denmark)

    2015-01-01

    A resonant power converter for operation in the radio frequency range, preferably in the VHF, comprises at least one PCB-embedded transformer. The transformer is configured for radio frequency operation and comprises a printed circuit board defining a horizontal plane, the printed circuit board...... comprising at least two horizontal conductive layers separated by an isolating layer, a first embedded solenoid forming a primary winding of the transformer and a second embedded solenoid being arranged parallel to the first solenoid and forming a secondary winding of the transformer, wherein the first...

  7. HB+ inserted into the CMS Solenoid

    CERN Multimedia

    Tejinder S. Virdee, CERN

    2006-01-01

    The first half of the barrel hadron calorimeter (HB+) has been inserted into the superconducting solenoid of CMS, in preparation for the magnet test and cosmic challenge. The operation went smoothly, lasting a couple of days.

  8. Catastrophic failure of a raise boring machine during underground reaming operations

    CSIR Research Space (South Africa)

    James, A

    1997-03-01

    Full Text Available This paper describes the investigation of the catastrophic failure of a raise boring machine used for underground reaming operations. The results of the investigation indicate that failure was due to the fracture of the 32 drive head bolts, 30...

  9. Paradigms of underground gas storage operation; Paradigmas del funcionamiento de un almacenamiento subterraneo de gas

    Energy Technology Data Exchange (ETDEWEB)

    Bonoris, Patricia; Vizcarra, Rodolfo; Buciak, Jorge [Companias Asociadas Petroleras S.A. (Argentina)

    2004-07-01

    The main objective of the study was to determine, for the underground storage of gas, the Current Useful Volume and Maximum Useful Current of operation, as well as have an acceptable interpretation that allows calculating the investment needed to reach this Maximum Usable Volume.

  10. 30 CFR 57.11059 - Respirable atmosphere for hoist operators underground.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Respirable atmosphere for hoist operators... NONMETAL MINES Travelways and Escapeways Escapeways-Underground Only § 57.11059 Respirable atmosphere for... be provided with a respirable atmosphere completely independent of the mine atmosphere. This...

  11. IE Information Notice No. 85-47: Potential effect of line-induced vibration on certain Target Rock solenoid-operated valves

    International Nuclear Information System (INIS)

    Jordan, E.L.

    1992-01-01

    On November 14, 1984, Arizona Public Services Company provided the NRC with a final report on a 10 CFR 50.55(e) reportable condition relating to qualification testing of certain TR (Target Rock), solenoid-operated valves. Four TR valves, procured by Combustion Engineering (CE) for use at Palo Verde Nuclear Generating Station Unit 3, were tested to the requirements of NUREG-0588, Category 1. Test valves included two 1-inch TR valves, model 77L-001 and two 2-inch TR valves, model 77L-003. The qualification test involved irradiation to 50 megarads, thermal aging at 260 F for 635 hours, mechanical cycling, vibrational aging to represent normal service vibration, seismic testing, and finally, testing in a simulated LOCA environment. The licensee reported that during the qualification testing, a number of anomalies were identified, and the test was discontinued when the test valves failed to function for different reasons during the seismic testing. CE an TR appraised the overall safety significance of the observed test anomalies for the licensee. They considered the failure of the valve to open on demand as a result of solenoid lead shorting caused by line-induced vibrational wear to be a common mode of failure that, in a seismic event, could potentially disable several redundant valves at the same time. This failure of the valve to open on demand is the only observed test anomaly considered to have significant generic safety implications and is the subject of this information notice

  12. Effects of SF$_{6}$ on the avalanche mode operation of a real-sized double-gap resistive plate chamber for the Compact Muon Solenoid experiment

    CERN Document Server

    Ahn Sung Hwan; Hong, B; Hong, S J; Ito, M; Kim, B I; Kim, J H; Kim, Y J; Kim, Y U; Koo, D G; Lee, H W; Lee, K B; Lee, K S; Lee, S J; Lim, J K; Moon, D H; Nam, S K; Park, S; Park, W J; Rhee, J T; Ryu, M S; Shim, H H; Sim, K S; Kang, T I

    2005-01-01

    We present the design and the test, results for a real-sized prototype resistive plate chamber by using cosmic-ray muons for the forward region of the Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC). In particular, we investigate the effects of adding SF/sub 6/ to the gas mixture for the avalanche mode operation of a resistive plate chamber. A small fraction of SF/sub 6/ is very effective in suppressing streamer signals in a resistive plate chamber. The shapes of the muon detection efficiency and the muon cluster size remain similar, but are shifted to higher operating voltage by SF/sub 6/. The noise cluster rate and size are not influenced by SF/sub 6/.

  13. Staff Technical Position on geological repository operations area underground facility design: Thermal loads

    International Nuclear Information System (INIS)

    Nataraja, M.S.

    1992-12-01

    The purpose of this Staff Technical Position (STP) is to provide the US Department of Energy (DOE) with a methodology acceptable to the Nuclear Regulatory Commission staff for demonstrating compliance with 10 CFR 60.133(i). The NRC staff's position is that DOE should develop and use a defensible methodology to demonstrate the acceptability of a geologic repository operations area (GROA) underground facility design. The staff anticipates that this methodology will include evaluation and development of appropriately coupled models, to account for the thermal, mechanical, hydrological, and chemical processes that are induced by repository-generated thermal loads. With respect to 10 CFR 60.133(i), the GROA underground facility design: (1) should satisfy design goals/criteria initially selected, by considering the performance objectives; and (2) must satisfy the performance objectives 10 CFR 60.111, 60.112, and 60.113. The methodology in this STP suggests an iterative approach suitable for the underground facility design

  14. Inserting the CMS solenoid

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The huge superconducting solenoid for CMS is inserted into the cryostat barrel. CMS uses the world's largest thin solenoid, in terms of energy stored, and is 12 m long, with a diameter of 6 m and weighing 220 tonnes. When turned on the magnet will produce a field strength of 4 T using superconducting niobium-titanium material at 4.5 K.

  15. ATLAS Solenoid Integration

    CERN Multimedia

    Ruber, R

    Last month the central solenoid was installed in the barrel cryostat, which it shares with the liquid argon calorimeter. Figure 1: Some members of the solenoid and liquid argon teams proudly pose in front of the barrel cryosat, complete with detector and magnet. Some two years ago the central solenoid arrived at CERN after being manufactured and tested in Japan. It was kept in storage until last October when it was finally moved to the barrel cryostat integration area. Here a position survey of the solenoid (with respect to the cryostat's inner warm vessel) was performed. Figure 2: The alignment survey by Dirk Mergelkuhl and Aude Wiart. (EST-SU) At the start of the New Year the solenoid was moved to the cryostat insertion stand. Figure 3: The solenoid on the insertion stand, with Akira Yamamoto the solenoid designer and project leader. Figure 4: Taka Kondo, ATLAS Japan spokesperson, and Shoichi Mizumaki, Toshiba project engineer for the ATLAS solenoid, celebrate the insertion. Aft...

  16. Central Solenoid On-surface Test

    CERN Multimedia

    Ruber, R

    2004-01-01

    A full scale on-surface test of the central solenoid has been performed before its final installation in the ATLAS cavern starting in November. The successful integration of the central solenoid into the barrel cryostat, as reported in the March 2004 ATLAS eNews, was hardly finished when testing started. After a six-week period to cool down the LAr calorimeter, the solenoid underwent a similar procedure. Cooling it down to 4.6 Kelvin from room temperature took just over five and a half days. Cold and superconducting, it was time to validate the functionality of the control and safety systems. These systems were largely the same as the systems to be used in the final underground installation, and will be used not only for the solenoid and toroid magnets, but parts of it also for other LHC experiments. This solenoid test was the first occasion to test the system functionality in a real working environment. Several days were spent to fine tune the systems, especially the critical safety system, which turned out...

  17. Intrusion resistant underground structure (IRUS) : design and operations

    International Nuclear Information System (INIS)

    Lange, B.A.

    1997-01-01

    The safety case for the IRUS low-level radioactive waste disposal facility is based on the fact that IRUS will contain three specific types of wastes only. The types of these wastes are baled wastes, bituminized incinerator ash, and bituminized reverse osmosis concentrate. IRUS will be a below-ground vault consisting of an open bottom reinforced-concrete structure (approximate dimensions 30m x 20m x 8m) with a reinforced-concrete roof. This paper covers the vault design and construction and operational features. 2 tabs

  18. Intrusion resistant underground structure (IRUS) : design and operations

    Energy Technology Data Exchange (ETDEWEB)

    Lange, B.A. [Atomic Energy of Canada Ltd., Chalk River, ON (Canada)

    1997-12-31

    The safety case for the IRUS low-level radioactive waste disposal facility is based on the fact that IRUS will contain three specific types of wastes only. The types of these wastes are baled wastes, bituminized incinerator ash, and bituminized reverse osmosis concentrate. IRUS will be a below-ground vault consisting of an open bottom reinforced-concrete structure (approximate dimensions 30m x 20m x 8m) with a reinforced-concrete roof. This paper covers the vault design and construction and operational features. 2 tabs.

  19. Angular collection using solenoids

    International Nuclear Information System (INIS)

    Chehab, R.

    1999-12-01

    Pion collection after the target is considered using solenoids. Two collection systems, involving solenoids, the quarter wave transformer and the adiabatic lens, widely used for the positron collection in linear accelerators, are described. Their main features, such as the acceptance volume in transverse phase space, the maximum source radius, the maximum transverse momentum acceptance, are described. The results are presented for the phase space associated with the canonical variables as well as for the trace space concerning the geometrical variables. The energy acceptances for both systems are presented and compared. Some special properties of the solenoids are then outlined. (author)

  20. On the Suitability of a Solenoid Horn for the ESS Neutrino Superbeam

    CERN Document Server

    Olvegård, Maja; Ruber, R; Ziemann, R; Koutchouk, J -P

    2015-01-01

    The European Spallation Source (ESS), now under construction in Lund, Sweden, offers unique opportunities for experimental physics, not only in neutron science but potentially in particle physics. The ESS neutrino superbeam project plans to use a 5 MW proton beam from the ESS linac to generate a high intensity neutrino superbeam, with the final goal of detecting leptonic CP-violation in an underground megaton Cherenkov water detector. The neutrino production requires a second target station and a complex focusing system for the pions emerging from the target. The normal-conducting magnetic horns that are normally used for these applications cannot accept the 2.86 ms long proton pulses of the ESS linac, which means that pulse shortening in an accumulator ring would be required. That, in turn, requires H- operation in the linac to accommodate the high intensity. As an attractive alternative, we investigate the possibility of using superconducting solenoids for the pion focusing. This solenoid horn system needs ...

  1. The Impact of Contract Operations on Safety in Underground Coal Mines.

    Science.gov (United States)

    Buessing, Marric; Boden, Leslie I

    2016-09-01

    The aim of this study was to test for differences in injury rates for contractor-operated underground coal mines relative to owner-operated mines in Kentucky, controlling for other covariates. We used disparities between MSHA contractor data and surface reclamation permit data to identify mines operated by contractors. We then used negative binomial regression to estimate injury rates from 1999 to 2013, controlling for mine and controller characteristics available from MSHA and the Energy Information Administration (EIA). Contractor-operated mines with 15 or fewer full-time equivalent workers (FTEs) had a statistically significant 57% higher covariate-adjusted reported traumatic injury rate than similar mines without contract operators. Larger contractor-operated mines did not have a statistically significant elevated rate. We detected a significant elevation of traumatic injury rates only among the smallest contractor-operated mines. This increase appears substantial enough to warrant attention.

  2. The ICARUS T600 Liquid Argon Detector Operation in the Underground Gran Sasso Laboratory

    CERN Document Server

    Vignoli, C

    2014-01-01

    The ICARUS T600 Module is the largest liquid argon detector (760 t LAr mass) ever realized to study neutrino oscill ations and matter stability in the deep underground Gran Sasso Laboratory. One of t he key elements for the detector performance is the liquid argon purity: residual electronegative compounds in argon have to be kept as low as 0.1 part s per billion all over the detector run. The T600 Module design was finalized by the ICARUS Collaboration after years of R&D studies that brought to the viable and scalable industrial solutions necessary for sized experiments with severe safety prescriptions for the underground operation . We present the T600 Module successful commissioning and the 3-years efficient, stable and continuous operation with extraordinary LAr purity, high performance and zero dead time data taking . This result demonstrates for the first time the feasibility of activation and long-term run in safe conditions of sized cryogenic detectors even in a confined underground location and r...

  3. Operation and performance of the ICARUS-T600 cryogenic plant at Gran Sasso underground Laboratory

    CERN Document Server

    Antonello, M.; Baibussinov, B.; Boffelli, F.; Bubak, A.; Calligarich, E.; Canci, N.; Centro, S.; Cesana, A.; Cieślik, K.; Cline, D.B.; Cocco, A.G.; Dabrowska, A.; Dermenev, A.; Disdier, J.M.; Falcone, A.; Farnese, C.; Fava, A.; Ferrari, A.; Gibin, D.; Gninenko, S.; Guglielmi, A.; Haranczyk, M.; Holeczek, J.; Ivashkin, A.; Kirsanov, M.; Kisiel, J.; Kochanek, I.; Lagoda, J.; Mania, S.; Menegolli, A.; Meng, G.; Montanari, C.; Otwinowski, S.; Picchi, P.; Pietropaolo, F.; Plonski, P.; Rappoldi, A.; Raselli, G.L.; Rossella, M.; Rubbia, C.; Sala, P.R.; Scaramelli, A.; Segreto, E.; Sergiampietri, F.; Stefan, D.; Sulej, R.; Szarska, M.; Terrani, M.; Torti, M.; Varanini, F.; Ventura, S.; Vignoli, C.; Wang, H.G.; Yang, X.; Zalewska, A.; Zani, A.; Zaremba, K.

    2015-12-04

    ICARUS T600 liquid argon time projection chamber is the first large mass electronic detector of a new generation able to combine the imaging capabilities of the old bubble chambers with the excellent calorimetric energy measurement. After the three months demonstration run on surface in Pavia during 2001, the T600 cryogenic plant was significantly revised, in terms of reliability and safety, in view of its long-term operation in an underground environment. The T600 detector was activated in Hall B of the INFN Gran Sasso Laboratory during Spring 2010, where it was operated without interruption for about three years, taking data exposed to the CERN to Gran Sasso long baseline neutrino beam and cosmic rays. In this paper the T600 cryogenic plant is described in detail together with the commissioning procedures that lead to the successful operation of the detector shortly after the end of the filling with liquid Argon. Overall plant performance and stability during the long-term underground operation are discusse...

  4. Issues of Exploitation of Induction Motors in the Course of Underground Mining Operations

    Science.gov (United States)

    Gumula, Stanisław; Hudy, Wiktor; Piaskowska-Silarska, Malgorzata; Pytel, Krzysztof

    2017-09-01

    Mining industry is one of the most important customers of electric motors. The most commonly used in the contemporary mining industry is alternating current machines used for processing electrical energy into mechanical energy. The operating problems and the influence of qualitative interference acting on the inputs of individual regulators to field-oriented system in the course of underground mining operations has been presented in the publication. The object of controlling the speed is a slip-ring induction motor. Settings of regulators were calculated using an evolutionary algorithm. Examination of system dynamics was performed by a computer with the use of the MATLAB / Simulink software. According to analyzes, large distortion of input signals of regulators adversely affects the rotational speed that pursued by the control system, which may cause a large vibration of the whole system and, consequently, its much faster destruction. Designed system is characterized by a significantly better resistance to interference. The system is stable with the properly selected settings of regulators, which is particularly important during the operation of machinery used in underground mining.

  5. Enhancement of organizational and technical solutions regarding anchoring of completed construction facilities of underground railway system to operating control

    Directory of Open Access Journals (Sweden)

    Е. Г. Козин

    2017-12-01

    Full Text Available Stages of practical realization of measures prescribed by requirements documents regarding anchoring of capital structures of underground railway system to operating control are considered in the article. On the basis of algorithm structure analysis, which includes obtaining a permit for putting into operation and cadastre works execution a range of solutions was proposed concerning optimization of construction project owner and operating organization activities with the purpose of terms reduction of capital structures handover to operation. The results of work of a commission responsible for completed underground railway system objects acceptance and putting into operation were analyzed. Considering example of object «Second entrance hall area of «Sportivnaya» station the statistical data of revealed snagging items is consolidated and dynamics of corrective actions is provided.Proposed solutions laid the foundation for corrections of requirements documents and were accepted for realization in the process of works acceptance of Saint-Petersburg underground railway system objects.

  6. ATLAS Solenoid Integration

    CERN Multimedia

    Ruber, R

    Last month the central solenoid was installed in the barrel cryostat, which it shares with the liquid argon calorimeter. Some two years ago the central solenoid arrived at CERN after being manufactured and tested in Japan. It was kept in storage until last October when it was finally moved to the barrel cryostat integration area. Here a position survey of the solenoid (with respect to the cryostat's inner warm vessel) was performed. At the start of the New Year the solenoid was moved to the cryostat insertion stand. After a test insertion on 6th February and a few weeks of preparation work it was finally inserted on 27th February. A couple of hectic 24-hours/7-day weeks followed in order to connect all services in the cryostat bulkhead. But last Monday, 15th March, both warm flanges of the cryostat could be closed. In another week's time we expect to finish the connection of the cryogenic cooling lines and the superconducting bus lines with the external services. Then the cool-down and test will commence... ...

  7. The Canfranc Underground Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Amare, J. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Beltran, B. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Carmona, J.M. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Cebrian, S. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Garcia, E. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Irastorza, I.G. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Gomez, H. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Luzon, G. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Martinez, M. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Morales, J. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Ortiz de Solorzano, A. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Pobes, C. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Puimedon, J. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Rodriguez, A. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Ruz, J. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Sarsa, M.L. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Torres, L. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain); Villar, J.A. [Laboratory of Nuclear and High Energy Physics, University of Zaragoza. 50009 Zaragoza (Spain)

    2005-06-15

    This paper describes the forthcoming enlargement of the Canfranc Underground Laboratory (LSC) which will allow to host new international Astroparticle Physics experiments and therefore to broaden the European underground research area. The new Canfranc Underground Laboratory will operate in coordination (through the ILIAS Project) with the Gran Sasso (Italy), Modane (France) and Boulby (UK) underground laboratories.

  8. Program of experiments for the operating phase of the Underground Research Laboratory

    International Nuclear Information System (INIS)

    Simmons, G.R.; Bilinsky, D.M.; Davison, C.C.; Gray, M.N.; Kjartanson, B.H.; Martin, C.D.; Peters, D.A.; Lang, P.A.

    1992-09-01

    The Underground Research Laboratory (URL) is one of the major research and development facilities that AECL Research has constructed in support of the Canadian Nuclear Fuel Waste Management Program. The URL is a unique geotechnical research facility constructed in previously undisturbed plutonic rock, which was well characterized before construction. The site evaluation and construction phases of the URL project have been completed and the operating phase is beginning. A program of operating phase experiments that address AECL's objectives for in situ testing has been selected. These experiments were subjected to an external peer review and a subsequent review by the URL Experiment Committee in 1989. The comments from the external peer review were incorporated into the experiment plans, and the revised experiments were accepted by the URL Experiment Committee. Summaries of both reviews are presented. The schedule for implementing the experiments and the quality assurance to be applied during implementation are also summarized. (Author) (9 refs., 11 figs.)

  9. Operational safety assessment of underground test facilities for mined geologic waste disposal

    International Nuclear Information System (INIS)

    Elder, H.K.

    1993-01-01

    This paper describes the operational safety assessment for the underground facilities for the exploratory studies facility (ESF) at the Yucca Mountain Project. The systematic identification and evaluation of hazards related to the ESF is an integral part of the systems engineering process; whereby safety is considered during planning, design, testing, and construction. A largely qualitative approach based on the analysis of potential accidents was used since radiological safety analysis was not required. The risk assessment summarized credible accident scenarios and the design provides mitigation of the risks to a level that the facility can be constructed and operated with an adequate level of safety. The risk assessment also provides reasonable assurance that all identifiable major accident scenarios have been reviewed and design mitigation features provided to ensure an adequate level of safety

  10. Underground operation of the ICARUS T600 LAr-TPC: first results

    CERN Document Server

    Rubbia, C.; Aprili, P.; Baibussinov, B.; Ceolin, M. Baldo; Barze, L.; Benetti, P.; Calligarich, E.; Canci, N.; Carbonara, F.; Cavanna, F.; Centro, S.; Cesana, A.; Cieslik, K.; Cline, D.B.; Cocco, A.G.; Dabrowska, A.; Dequal, D.; Dermenev, A.; Dolfini, R.; Farnese, C.; Fava, A.; Ferrari, A.; Fiorillo, G.; Gibin, D.; Berzolari, A. Gigli; Gninenko, S.; Golan, T.; Guglielmi, A.; Haranczyk, M.; Holeczek, J.; Karbowniczek, P.; Kirsanov, M.; Kisiel, J.; Kochanek, I.; Lagoda, J.; Lantz, M.; Mania, S.; Mannocchi, G.; Mauri, F.; Menegolli, A.; Meng, G.; Montanari, C.; Muraro, S.; Otwinowski, S.; Palamara, O.; Palczewski, T.J.; Periale, L.; Piazzoli, A.; Picchi, P.; Pietropaolo, F.; Plonski, P.; Prata, M.; Przewlocki, P.; Rappoldi, A.; Raselli, G.L.; Rossella, M.; Sala, P.; Scantamburlo, E.; Scaramelli, A.; Segreto, E.; Sergiampietri, F.; Sobczyk, J.; Stefan, D.; Stepaniak, J.; Sulej, R.; Szarska, M.; Terrani, M.; Varanini, F.; Ventura, S.; Vignoli, C.; Wachala, T.; Wang, H.; Yang, X.; Zalewska, A.; Zaremba, K.; Zmuda, J.

    2011-01-01

    Open questions are still present in fundamental Physics and Cosmology, like the nature of Dark Matter, the matter-antimatter asymmetry and the validity of the particle interaction Standard Model. Addressing these questions requires a new generation of massive particle detectors exploring the subatomic and astrophysical worlds. ICARUS T600 is the first large mass (760 ton) example of a novel detector generation able to combine the imaging capabilities of the old famous "bubble chamber" with an excellent energy measurement in huge electronic detectors. ICARUS T600 now operates at the Gran Sasso underground laboratory, studying cosmic rays, neutrino oscillation and proton decay. Physical potentialities of this novel telescope are presented through few examples of neutrino interactions reconstructed with unprecedented details. Detector design and early operation are also reported.

  11. Central Solenoid Insert Technical Specification

    Energy Technology Data Exchange (ETDEWEB)

    Martovetsky, Nicolai N [ORNL; Smirnov, Alexandre [ORNL

    2011-09-01

    The US ITER Project Office (USIPO) is responsible for the ITER central solenoid (CS) contribution to the ITER project. The Central Solenoid Insert (CSI) project will allow ITER validation the appropriate lengths of the conductors to be used in the full-scale CS coils under relevant conditions. The ITER Program plans to build and test a CSI to verify the performance of the CS conductor. The CSI is a one-layer solenoid with an inner diameter of 1.48 m and a height of 4.45 m between electric terminal ends. The coil weight with the terminals is approximately 820 kg without insulation. The major goal of the CSI is to measure the temperature margin of the CS under the ITER direct current (DC) operating conditions, including determining sensitivity to load cycles. Performance of the joints, ramp rate sensitivity, and stability against thermal or electromagnetic disturbances, electrical insulation, losses, and instrumentation are addressed separately and therefore are not major goals in this project. However, losses and joint performance will be tested during the CSI testing campaign. The USIPO will build the CSI that will be tested at the Central Solenoid Model Coil (CSMC) Test Facility at the Japan Atomic Energy Agency (JAEA), Naka, Japan. The industrial vendors (the Suppliers) will report to the USIPO (the Company). All approvals to proceed will be issued by the Company, which in some cases, as specified in this document, will also require the approval of the ITER Organization. Responsibilities and obligations will be covered by respective contracts between the USIPO, called Company interchangeably, and the industrial Prime Contractors, called Suppliers. Different stages of work may be performed by more than one Prime Contractor, as described in this specification. Technical requirements of the contract between the Company and the Prime Contractor will be covered by the Fabrication Specifications developed by the Prime Contractor based on this document and approved by

  12. Enhancement of organizational and technical solutions regarding anchoring of completed construction facilities of underground railway system to operating control

    OpenAIRE

    Е. Г. Козин

    2017-01-01

    Stages of practical realization of measures prescribed by requirements documents regarding anchoring of capital structures of underground railway system to operating control are considered in the article. On the basis of algorithm structure analysis, which includes obtaining a permit for putting into operation and cadastre works execution a range of solutions was proposed concerning optimization of construction project owner and operating organization activities with the purpose of terms redu...

  13. Electron beam solenoid reactor concept

    International Nuclear Information System (INIS)

    Bailey, V.; Benford, J.; Cooper, R.; Dakin, D.; Ecker, B.; Lopez, O.; Putman, S.; Young, T.S.T.

    1977-01-01

    The electron Beam Heated Solenoid (EBHS) reactor is a linear magnetically confined fusion device in which the bulk or all of the heating is provided by a relativistic electron beam (REB). The high efficiency and established technology of the REB generator and the ability to vary the coupling length make this heating technique compatible with several radial and axial enery loss reduction options including multiple-mirrors, electrostatic and gas end-plug techniques. This paper addresses several of the fundamental technical issues and provides a current evaluation of the concept. The enhanced confinement of the high energy plasma ions due to nonadiabatic scattering in the multiple mirror geometry indicates the possibility of reactors of the 150 to 300 meter length operating at temperatures > 10 keV. A 275 meter EBHS reactor with a plasma Q of 11.3 requiring 33 MJ of beam eneergy is presented

  14. Design and operation problems related to water curtain system for underground water-sealed oil storage caverns

    Directory of Open Access Journals (Sweden)

    Zhongkui Li

    2016-10-01

    Full Text Available The underground water-sealed storage technique is critically important and generally accepted for the national energy strategy in China. Although several small underground water-sealed oil storage caverns have been built in China since the 1970s, there is still a lack of experience for large-volume underground storage in complicated geological conditions. The current design concept of water curtain system and the technical instruction for system operation have limitations in maintaining the stability of surrounding rock mass during the construction of the main storage caverns, as well as the long-term stability. Although several large-scale underground oil storage projects are under construction at present in China, the design concepts and construction methods, especially for the water curtain system, are mainly based on the ideal porosity medium flow theory and the experiences gained from the similar projects overseas. The storage projects currently constructed in China have the specific features such as huge scale, large depth, multiple-level arrangement, high seepage pressure, complicated geological conditions, and high in situ stresses, which are the challenging issues for the stability of the storage caverns. Based on years' experiences obtained from the first large-scale (millions of cubic meters underground water-sealed oil storage project in China, some design and operation problems related to water curtain system during project construction are discussed. The drawbacks and merits of the water curtain system are also presented. As an example, the conventional concept of “filling joints with water” is widely used in many cases, as a basic concept for the design of the water curtain system, but it is immature. In this paper, the advantages and disadvantages of the conventional concept are pointed out, with respect to the long-term stability as well as the safety of construction of storage caverns. Finally, new concepts and principles

  15. Bent Solenoids with Superimposed Dipole Fields

    Energy Technology Data Exchange (ETDEWEB)

    Meinke, Rainer, B.; Goodzeit, Carl, L.

    2000-03-21

    A conceptual design and manufacturing technique were developed for a superconducting bent solenoid magnet with a superimposed dipole field that would be used as a dispersion device in the cooling channel of a future Muon Collider. The considered bent solenoid is equivalent to a 180° section of a toroid with a major radius of ~610 mm and a coil aperture of ~416 mm. The required field components of this magnet are 4 tesla for the solenoid field and 1 tesla for the superimposed dipole field. A magnet of this size and shape, operating at these field levels, has to sustain large Lorentz forces resulting in a maximum magnetic pressure of about 2,000 psi. A flexible round mini-cable with 37 strands of Cu-NbTi was selected as the superconductor. Detailed magnetic analysis showed that it is possible to obtain the required superimposed dipole field by tilting the winding planes of the solenoid by ~25°. A complete structural analysis of the coil support system and the helium containment vessel under thermal, pressure, and Lorentz force loads was carried out using 3D finite element models of the structures. The main technical issues were studied and solutions were worked out so that a highly reliable magnet of this type can be produced at an affordable cost.

  16. Preparedness of fire safety in underground train station: Comparison between train operators in Malaysia with other operators from the developed countries

    Science.gov (United States)

    Tajedi, Noor Aqilah A.; Sukor, Nur Sabahiah A.; Ismail, Mohd Ashraf M.; Shamsudin, Shahrul A.

    2017-10-01

    The purpose of this paper is to compare the fire evacuation plan and preparation at the underground train stations in the different countries. The methodology for this study was using the extended questionnaire survey to investigate the Rapid Rail Sdn Bhd, Malaysia's fire safety plan and preparation at the underground train stations. There were four sections in the questionnaire which included (i) background of the respondents, (ii) the details on the train stations, safety instruction and fire evacuation exercises (iii) technical systems, installation and equipment at the underground stations and (iv) procedures and technical changes related to fire safety that had been applied by the operators. Previously, the respondents from the different train operator services in the developed countries had completed the questionnaires. This paper extends the response from the Rapid Rail Sdn Bhd to compare the emergency procedures and preparation for fire event with the developed countries. As a result, this study found that the equipment and facilities that provided at the underground train stations that operated by Rapid Rail are relevant for fire safety procedures and needs. The main advantage for Rapid Rail is the underground stations were designed with two or more entrances/exits that may perform better evacuation compare to one main entrance/exit train stations in the other developed countries.

  17. The large superconducting solenoids for the g-2 muon storage ring

    International Nuclear Information System (INIS)

    Bunce, G.; Cullen, J.; Danby, G.

    1994-01-01

    The g-2 muon storage ring at Brookhaven National Laboratory consists of four large superconducting solenoids. The two outer solenoids, which are 15.1 meters in diameter, share a common cryostat. The two inner solenoids, which are 13.4 meters in diameter, are in separate cryostats. The two 24 turn inner solenoids are operated at an opposite polarity from the two 24 turn outer solenoids. This generates a dipole field between the inner and outer solenoids. The flux between the solenoids is returned through a C shaped iron return yoke that also shapes the dipole field. The integrated field around the 14 meter diameter storage ring must be good to about 1 part in one million over the 90 mm dia. circular cross section where the muons are stored, averaged over the azimuth. When the four solenoids carry their 5300 A design current, the field in the 18 centimeter gap between the poles is 1.45 T. When the solenoid operates at its design current 5.5 MJ is stored between the poles. The solenoids were wound on site at Brookhaven National Laboratory. The cryostats were built around the solenoid windings which are indirectly cooled using two-phase helium

  18. The use of contained nuclear explosions to create underground reservoirs, and experience of operating these for gas condensate storage

    International Nuclear Information System (INIS)

    Kedrovskij, O.L.; Myasnikov, K.V.; Leonov, E.A.; Romadin, N.M.; Dorodnov, V.F.; Nikiforov, G.A.

    1975-01-01

    Investigations on the creation of underground reservoirs by means of nuclear explosions have been going on in the Soviet Union for many years. In this paper the authors consider three main kinds of sites or formations that can be used for constructing reservoirs by this method, namely, low-permeable rocks, worked-out mines and rock salt formations. Formulae are given for predicting the mechanical effect of an explosion in rocks, taking their strength characteristics into account. Engineering procedures are described for sealing and restoring the emplacement holes, so that they can be used for operating the underground reservoir. Experience with the contruction and operation of a 50 000 m 3 gas-condensate reservoir in a rock salt formation is described. In the appendix to the paper a method is presented for calculating the stability of spherical cavities created by nuclear explosions in rock salt, allowing for the development of elasto-plastic deformations and creep

  19. SUPERCONDUCTING SOLENOIDS FOR THE MUON COLLIDER

    Energy Technology Data Exchange (ETDEWEB)

    GREEN,M.A.; EYSSA,Y.; KENNY,S.; MILLER,J.R.; PRESTEMON,S.; WEGGEL,R.J.

    2000-06-12

    The muon collider is a new idea for lepton colliders. The ultimate energy of an electron ring is limited by synchrotron radiation. Muons, which have a rest mass that is 200 times that of an electron can be stored at much higher energies before synchrotron radiation limits ring performance. The problem with muons is their short life time (2.1 {micro}s at rest). In order to operate a muon storage ring large numbers of muon must be collected, cooled and accelerated before they decay to an electron and two neutrinos. As the authors see it now, high field superconducting solenoids are an integral part of a muon collider muon production and cooling systems. This report describes the design parameters for superconducting and hybrid solenoids that are used for pion production and collection, RF phase rotations of the pions as they decay into muons and the muon cooling (reduction of the muon emittance) before acceleration.

  20. Superconducting Solenoids for the Muon Collider

    International Nuclear Information System (INIS)

    Green, M.A.; Eyssa, Y.; Kenny, S.; Miller, J.R.; Prestemon, S.; Weggel, R.J.

    2000-01-01

    The muon collider is a new idea for lepton colliders. The ultimate energy of an electron ring is limited by synchrotron radiation. Muons, which have a rest mass that is 200 times that of an electron can be stored at much higher energies before synchrotron radiation limits ring performance. The problem with muons is their short life time (2.1 micros at rest). In order to operate a muon storage ring large numbers of muon must be collected, cooled and accelerated before they decay to an electron and two neutrinos. As the authors see it now, high field superconducting solenoids are an integral part of a muon collider muon production and cooling systems. This report describes the design parameters for superconducting and hybrid solenoids that are used for pion production and collection, RF phase rotations of the pions as they decay into muons and the muon cooling (reduction of the muon emittance) before acceleration

  1. Temperature measurement of accelerator cell solenoid loop

    International Nuclear Information System (INIS)

    Mu Fan; Dong Pan; Dai Zhiyong

    2010-01-01

    This paper presents the research on temperature measurement of solenoid loop. The measuring temperature fiber is layered in solenoid loop for the accelerator cell. When the solenoid loop is supplied with high current form a constant current source, its temperature increases rapidly. The temperature fiber can measure the temperature of the solenoid loop and get temperature measurement rule. Experiment and simulation show temperature of interior solenoid loop the highest and it decreases from the interior to the exterior of solenoid loop. To control temperature of solenoid loop under 60 degree C, simulation displays load interval of constant current source with 80 A current should be at least is 17.5 minutes. (authors)

  2. Maintaining an effective and efficient control system for the Electromagnetic Calorimeter of the Compact Muon Solenoid experiment during Long-Term Operations of CERN�??s Large Hadron Collider

    CERN Document Server

    Holme, Oliver

    2012-01-01

    The sub-detectors of the Compact Muon Solenoid (CMS) multi-purpose particle detector at the CERN Large Hadron Collider (LHC) have been collecting physics data from particle collisions for almost three years. During this period, the CMS Electromagnetic Calorimeter (ECAL) Detector Control System (DCS) has contributed to the high level of availability of the experiment. This paper presents the current architecture of this distributed and heterogeneous control system alongside plans and developments for future improvements. To ensure that the system can efficiently operate and adapt to changes throughout the required operation lifetime of more than a decade, the potential legacy aspects of this kind of control system must be carefully managed. Such issues include evolving system requirements, turnover of staff members, potential benefits from new technologies and the need to follow release schedules of external software dependencies. The techniques and results of the work to continually maintain, improve and stre...

  3. Solenoid for Laser Induced Plasma Experiments at Janus

    Science.gov (United States)

    Klein, Sallee; Leferve, Heath; Kemp, Gregory; Mariscal, Derek; Rasmus, Alex; Williams, Jackson; Gillespie, Robb; Manuel, Mario; Kuranz, Carolyn; Keiter, Paul; Drake, R.

    2017-10-01

    Creating invariant magnetic fields for experiments involving laser induced plasmas is particularly challenging due to the high voltages at which the solenoid must be pulsed. Creating a solenoid resilient enough to survive through large numbers of voltage discharges, enabling it to endure a campaign lasting several weeks, is exceptionally difficult. Here we present a solenoid that is robust through 40 μs pulses at a 13 kV potential. This solenoid is a vast improvement over our previously fielded designs in peak magnetic field capabilities and robustness. Designed to be operated at small-scale laser facilities, the solenoid housing allows for versatility of experimental set-ups among diagnostic and target positions. Within the perpendicular field axis at the center there is 300 degrees of clearance which can be easily modified to meet the needs of a specific experiment, as well as an f/3 cone for transmitted or backscattered light. After initial design efforts, these solenoids are relatively inexpensive to manufacture.

  4. Manufacture, Installation and Operation of an In-situ Solute Migration System in KAERI Underground Research Tunnel (KURT)

    International Nuclear Information System (INIS)

    Lee, Jae Kwang; Baik, Min Hoon

    2009-07-01

    This report describes the design, installation, operation and maintenance of the in-situ solute migration system (IMS) which was installed in KAERI underground research tunnel (KURT) for the in-situ investigation of the solute migration. The IMS is consisted of the injection part, the extraction part, the measurement part, and the packer gas controlling system. The IMS was designed to measure the properties of the KURT groundwater in real time, which includes pH, redox potential, dissolved oxygen, electrical conductivity, and temperature. the remote control system was established to control the data processing unit through the internet

  5. Electromagnetic behaviour of the shield in turbogenerators with superconducting solenoids

    International Nuclear Information System (INIS)

    Del Vecchio, P.; Veca, G.M.; Sacerdoti, G.

    1975-11-01

    The structure of turbogenerators with superconducting solenoids is analyzed and the investigation of electromagnetic behaviour of the rotating shield is presented. The cases considered are: (a) An hypothetical operation with a single phase with nominal current; (b) Steady-state operation in inverse sequence with 10% of the nominal current; (c) A step variation of the magnetic field intensity in the shield

  6. Geomechanical Assessments of Simultaneous Operation in the Case of Transition from Open Pit to Underground Mine in Vietnam

    Science.gov (United States)

    Niedbalski, Zbigniew; Nguyen, Phu Minh Vuong; Widzyk-Capehart, Eleonora

    2018-03-01

    Nowadays, for a number of reasons, many open pit mines are considering a transition from Open Pit (OP) to Underground (UG) to remain competitive. In OP-UG transition, UG operation is operated simultaneously with the OP operation for a certain period of time. Guidelines for the simultaneous operation of OP and UG are very difficult to establish, as there are very few case studies available. Yet, because of the OP-UG interactions; the operation has a higher safety, technical and management requirements than the OP or UG methods when considered separately. In Vietnam, Cao Son is one of many OP mines, which decided to change the operational system from OP to UG. Simultaneous operation started in 2015 and will be conducted until 2030 when the OP mine Cao Son ends its mining activities. In this paper, selected geomechanical considerations of the simultaneous operation are presented. A number of numerical modelling calculations using finitedifference software with code FLAC were carried out for calibration process, slope stability analysis and the OP-UG interaction analysis for the Cao Son - Khe Cham II-IV mine. Based on the results obtained from numerical modelling, the geomechanical assessments of simultaneous operation Cao Son - Khe Cham II-IV are discussed in this paper.

  7. Magnetic design constraints of helical solenoids

    Energy Technology Data Exchange (ETDEWEB)

    Lopes, M. L. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Krave, S. T. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Tompkins, J. C. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Yonehara, K. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Flanagan, G. [Muons Inc., Batavia, IL (United States); Kahn, S. A. [Muons Inc., Batavia, IL (United States); Melconian, K. [Texas A & M Univ., College Station, TX (United States)

    2015-01-30

    Helical solenoids have been proposed as an option for a Helical Cooling Channel for muons in a proposed Muon Collider. Helical solenoids can provide the required three main field components: solenoidal, helical dipole, and a helical gradient. In general terms, the last two are a function of many geometric parameters: coil aperture, coil radial and longitudinal dimensions, helix period and orbit radius. In this paper, we present design studies of a Helical Solenoid, addressing the geometric tunability limits and auxiliary correction system.

  8. Magnetic quadrupole and solenoidal spectrometers

    International Nuclear Information System (INIS)

    Laurent, H.; Schapira, J.P.

    1979-01-01

    General optical properties of magnetic quadrupole spectrometers are reviewed, together with experimental purposes for nuclear physics: background reduction, magnetic rigidity filtering for extreme forward angles measurements, light charged particle discrimination, ionic charge state separation, time of flight mass spectrometry and fast collection of radioactive nuclear reaction products. Possibility of alternative devices such as superconducting quadrupoles or solenoid spectrometers are discussed. (Auth.)

  9. Aharonov-Bohm effect without contact with the solenoid

    Science.gov (United States)

    de Oliveira, César R.; Romano, Renan G.

    2017-10-01

    We add a scalar potential to the 2D Aharonov-Bohm (AB) model which properly diverges both at the solenoid border and at infinity so that the resulting operator is essentially self-adjoint and has a discrete spectrum; the former property is interpreted as no contact of the particle with the solenoid border since there is no need of boundary conditions. We study gauge transformations to get the usual periodic behavior of the AB properties as a function of the magnetic flux. The presence of the AB effect is proven through the ground state energy, which is shown to be smooth in case it is simple and with a nonzero derivative if the ground state is real valued; such properties are verified in the case of circular solenoids, for which it is shown to be a nonconstant periodic function with a minimum at integer and a maximum at half-integer circulations (at half-integer circulations, it is doubly degenerated).

  10. Operational Efficiency Forecasting Model of an Existing Underground Mine Using Grey System Theory and Stochastic Diffusion Processes

    Directory of Open Access Journals (Sweden)

    Svetlana Strbac Savic

    2015-01-01

    Full Text Available Forecasting the operational efficiency of an existing underground mine plays an important role in strategic planning of production. Degree of Operating Leverage (DOL is used to express the operational efficiency of production. The forecasting model should be able to involve common time horizon, taking the characteristics of the input variables that directly affect the value of DOL. Changes in the magnitude of any input variable change the value of DOL. To establish the relationship describing the way of changing we applied multivariable grey modeling. Established time sequence multivariable response formula is also used to forecast the future values of operating leverage. Operational efficiency of production is often associated with diverse sources of uncertainties. Incorporation of these uncertainties into multivariable forecasting model enables mining company to survive in today’s competitive environment. Simulation of mean reversion process and geometric Brownian motion is used to describe the stochastic diffusion nature of metal price, as a key element of revenues, and production costs, respectively. By simulating a forecasting model, we imitate its action in order to measure its response to different inputs. The final result of simulation process is the expected value of DOL for every year of defined time horizon.

  11. Operational Plan for Underground Storage Tank 322 R2U2

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-06-07

    This Operational Plan provides the operator of the tank system with guidelines relating to the safe and compliant operation and maintenance of the tank system. The tank system schematic and list of emergency contacts shall be posted near the tank so they are visible to tank personnel. This Operational Plan shall be kept on file by the Facility Supervisor. It should be understood when managing this tank system that it is used to store hazardous waste temporarily for 90 calendar days or less. The rinsewater handled in the tank system is considered hazardous and may exhibit the characteristic of toxicity.

  12. Performance of a proximity cryogenic system for the ATLAS central solenoid magnet

    CERN Document Server

    Doi, Y; Makida, Y; Kondo, Y; Kawai, M; Aoki, K; Haruyama, T; Kondo, T; Mizumaki, S; Wachi, Y; Mine, S; Haug, F; Delruelle, N; Passardi, Giorgio; ten Kate, H H J

    2002-01-01

    The ATLAS central solenoid magnet has been designed and constructed as a collaborative work between KEK and CERN for the ATLAS experiment in the LHC project The solenoid provides an axial magnetic field of 2 Tesla at the center of the tracking volume of the ATLAS detector. The solenoid is installed in a common cryostat of a liquid-argon calorimeter in order to minimize the mass of the cryostat wall. The coil is cooled indirectly by using two-phase helium flow in a pair of serpentine cooling line. The cryogen is supplied by the ATLAS cryogenic plant, which also supplies helium to the Toroid magnet systems. The proximity cryogenic system for the solenoid has two major components: a control dewar and a valve unit In addition, a programmable logic controller, PLC, was prepared for the automatic operation and solenoid test in Japan. This paper describes the design of the proximity cryogenic system and results of the performance test. (7 refs).

  13. Performance of a proximity cryogenic system for the ATLAS central solenoid magnet

    Science.gov (United States)

    Doi, Y.; Yamamoto, A.; Makida, Y.; Kondo, Y.; Kawai, M.; Aoki, K.; Haruyama, T.; Kondo, T.; Mizumaki, S.; Wachi, Y.; Mine, S.; Haug, F.; Delruelle, N.; Passardi, G.; ten Kate, H.

    2002-05-01

    The ATLAS central solenoid magnet has been designed and constructed as a collaborative work between KEK and CERN for the ATLAS experiment in the LHC project. The solenoid provides an axial magnetic field of 2 Tesla at the center of the tracking volume of the ATLAS detector. The solenoid is installed in a common cryostat of a liquid-argon calorimeter in order to minimize the mass of the cryostat wall. The coil is cooled indirectly by using two-phase helium flow in a pair of serpentine cooling line. The cryogen is supplied by the ATLAS cryogenic plant, which also supplies helium to the Toroid magnet systems. The proximity cryogenic system for the solenoid has two major components: a control dewar and a valve unit. In addition, a programmable logic controller, PLC, was prepared for the automatic operation and solenoid test in Japan. This paper describes the design of the proximity cryogenic system and results of the performance test.

  14. Development of a superconducting solenoid for CADS

    International Nuclear Information System (INIS)

    Wu Wei; Wang Zhijun; Wu Beiming

    2014-01-01

    A superconducting focusing solenoid has been designed and developed for the China Accelerator Driven System (CADS). In order to meet the requirement of focusing strength and fringe field while minimizing the physical size of the solenoid, the novel optimizing design method based on a linear programming method was employed. In this report, the design of the solenoid including magnetic field optimization, mechanical design and quench protection will be introduced. The solenoid has been fabricated and tested. The testing results show that the central field reached 8.4 T and the stray field was lower than 50 Gauss in the cavity zone. (authors)

  15. Laser-heated solenoid fusion

    International Nuclear Information System (INIS)

    Vlases, G.C.

    1977-01-01

    Since the suggestion by Dawson, Hertzberg, and Kidder that high-energy CO 2 lasers could be used to heat magnetically confined plasma columns to thermonuclear temperatures, a great deal of theoretical and experimental work has been performed. In this paper we first review the experiments on the basic laser-plasma interaction phenomena, in which lasers with energies up to 1 kJ have been used to produce plasmas at n/sub e/ greater than 10 18 and T/sub e/ greater than 200 eV. The second part reviews fusion reactor studies based on the laser solenoid

  16. High field laser heated solenoids

    International Nuclear Information System (INIS)

    Hoffman, A.L.

    1979-01-01

    A 10 kJ pulsed CO 2 laser and 3.8 cm bore, 15 T, 8 μs rise time, 1-m long fast solenoid facility has been constructed to demonstrate the feasibility of using long wavelength lasers to heat magnetically confined plasmas. The most critical physics requirement is the necessity of creating and maintaining an on-axis electron density minimum to trap the axially directed laser beam. Satisfaction of this requirement has been demonstrated by heating 1.5 Torr deuterium fill plasmas in 2.7 cm bore plasma tubes to line energies of approximately 1 kJ/m. (Auth.)

  17. Occupational Malfunctioning and Fatigue Related Work Stress Disorders (FRWSDs): An Emerging Issue in Indian Underground Mine (UGM) Operations

    Science.gov (United States)

    Dey, Shibaji Ch.; Dey, Netai Chandra; Sharma, Gourab Dhara

    2017-09-01

    Indian underground mining (UGM) transport system largely deals with different fore and back bearing work processes associated with different occupational disorders and fatigue related work stress disorders (FRWSDs). Therefore, this research study is specifically aimed to determine the fatigue related problems in general and determination of Recovery Heart Rate (Rec HR) pattern and exact cause of FRWSDs in particular. A group of twenty (N = 20) UGM operators are selected for the study. Heart rate profiles and work intensities of selected workforces have been recorded continuously during their regular mine operation and the same workforces are tested on a treadmill on surface with almost same work intensity (%Maximal Heart Rate) which was earlier observed in the mine. Recovery Heart Rate (Rec HR) in both the experiment zones is recorded. It is observed that with almost same work intensity, the recovery patterns of submaximal prolonged work in mine are different as compared to treadmill. This research study indicates that non-biomechanical muscle activity along with environmental stressors may have an influence on recovery pattern and FRWSDs.

  18. 2 T superconducting detector solenoid for the PANDA target spectrometer

    Energy Technology Data Exchange (ETDEWEB)

    Efremov, A.A.; Koshurnikov, E.K. [Joint Institute for Nuclear Research, High Energy Physics Laboratory, Joliot-Curie, 6, 141980 Dubna, Moscow Region (Russian Federation); Lobanov, Y.Y. [Joint Institute for Nuclear Research, High Energy Physics Laboratory, Joliot-Curie, 6, 141980 Dubna, Moscow Region (Russian Federation)], E-mail: lobanov@jinr.ru; Makarov, A.F. [Joint Institute for Nuclear Research, High Energy Physics Laboratory, Joliot-Curie, 6, 141980 Dubna, Moscow Region (Russian Federation); Orth, H. [Gesellschaft fuer Schwerionenforschung, Planckstrasse 1, D-64291, Darmstadt (Germany); Sissakian, A.N.; Vodopianov, A.S. [Joint Institute for Nuclear Research, High Energy Physics Laboratory, Joliot-Curie, 6, 141980 Dubna, Moscow Region (Russian Federation)

    2008-02-01

    This paper describes the JINR design of the large 2 T superconducting solenoid for the target spectrometer of the PANDA experiment at HESR (FAIR, GSI, Darmstadt, Germany). The solenoid coil has an inner radius of 1.08 m and a length of 2.90 m. This solenoid is non-centrally split providing a warm bore of 100 mm in diameter through the coil to accommodate sufficient space for the internal target installations. Maximally stored energy in the windings is 22.3 MJ. All tracking and calorimetric detectors surrounding the target point, with exception of a forward cone of 5{sup 0} opening, are placed inside the lqHe-cryostat. The main features of the design and technique are as follows: a copper stabilizer and soldering technique for the superconducting cable; a stainless steel cryostat; winding technique over a mandrel; coreless type of the coil; low operational current. The details of the PANDA solenoid design including the magnetic field and stress-strain calculations are covered.

  19. CERN tests largest superconducting solenoid magnet

    CERN Multimedia

    2006-01-01

    "CERN's Compacts Muon Solenoid (CMS) - the world's largest superconducting solenoid magnet - has reached full field in testing. The instrument is part of the proton-proton Large Hadron Collider (LHC) project, located in a giant subterranean chamber at Cessy on the Franco-Swiss border." (1 page)

  20. Assessment of radiological status of Bagjata underground uranium mine operating in the east Singhbhum District of Jharkhand

    International Nuclear Information System (INIS)

    Rana, B.K.; Meena, J.S.; Thakur, V.K.; Sahoo, S.K.; Tripathi, R.M.; Puranik, V.D.

    2012-01-01

    Bagjata uranium mine deposits (22 °28’ 07”N and 86°29’ 36” E) is located in Dhalmugarh subdivision of East Singhbhum district of Jharkhand. This mine was commissioned in 2008 and presently it is operating with a production capacity of 500 tonne/day. The mining of uranium ores can lead to both internal and external exposures of workers. Internal exposure arises from the inhalation of radon gas and its decay products and radionuclides in ore dust. The contribution of respirable ore dust toward internal exposure has been reported to be insignificant in a low ore grade uranium mines by several authors. Radon gas is produced by the alpha decay of 226 Ra, which is a product of the long lived antecedent uranium ( 238 U), is present in the rocks, decays to a number of short-lived decay products that are themselves radioactive. Radon gas diffuses into the mine air through cracks and fissures present in the ore body, during blasting, mucking and fragmentation of ore body in mine. The short-lived daughters, 218 Po, 214 Pb, 214 Bi and 214 Po, are the principal contributor to internal exposure to mine workers. Radon has been recognized as a radiation hazard causing excess lung cancer among underground miners (NAS, 1988; ATSDR, 1990). 222 Rn concentration in the mine air was estimated by using a scintillation cell technique

  1. First Dark Matter Search Results from a 4-kg CF$_3$I Bubble Chamber Operated in a Deep Underground Site

    Energy Technology Data Exchange (ETDEWEB)

    Behnke, E.; /Indiana U., South Bend; Behnke, J.; /Indiana U., South Bend; Brice, S.J.; /Fermilab; Broemmelsiek, D.; /Fermilab; Collar, J.I.; /Chicago U., EFI; Conner, A.; /Indiana U., South Bend; Cooper, P.S.; /Fermilab; Crisler, M.; /Fermilab; Dahl, C.E.; /Chicago U., EFI; Fustin, D.; /Chicago U., EFI; Grace, E.; /Indiana U., South Bend /Fermilab

    2012-04-01

    New data are reported from the operation of a 4.0 kg CF{sub 3}I bubble chamber in the 6800 foot deep SNOLAB underground laboratory. The effectiveness of ultrasound analysis in discriminating alpha decay background events from single nuclear recoils has been confirmed, with a lower bound of >99.3% rejection of alpha decay events. Twenty single nuclear recoil event candidates and three multiple bubble events were observed during a total exposure of 553 kg-days distributed over three different bubble nucleation thresholds. The effective exposure for single bubble recoil-like events was 437.4 kg-days. A neutron background internal to the apparatus, of known origin, is estimated to account for five single nuclear recoil events and is consistent with the observed rate of multiple bubble events. This observation provides world best direct detection constraints on WIMP-proton spin-dependent scattering for WIMP masses >20 GeV/c{sup 2} and demonstrates significant sensitivity for spin-independent interactions.

  2. Surface motion near underground nuclear explosions in desert alluvium Operation Nougat I, Area 3, Nevada Test Site

    International Nuclear Information System (INIS)

    Perret, W.R.

    1978-05-01

    During Operation Nougat I, which was conducted in late 1961 and the first half of 1962, Sandia Laboratories measured surface motion in the vicinity of all contained underground nuclear explosions conducted by the Los Alamos Scientific Laboratory in Area 3 of the Nevada Test Site. This report presents and analyses most of the data derived from that study. Propagation velocities in the desert alluvium, 4440 ft/sec, and underlying tuff, 6020 ft/sec, are typical of those derived from later measurements. Motion attenuation data exhibit considerable scatter, in part because of early measurement and data reduction techniques but primarily because of differences in the characteristics of the geologic media which had not then been recognized. However, regression fits to the scaled data show attenuation of scaled acceleration at a rate 35% greater than that observed for Merlin event data (Merlin was conducted later in Area 3). The attenuation rate for particle velocity data from Nougat I events was 47% less than that for Merlin data, and the Nougat I scaled displacement data attenuation rate was 87% less than that for Merlin data. Analysis of data from a vertical string of gages extending to the surface above the Mink explosion has established a significant difference between normal spallation above contained explosions in competent rock and the reaction of uncemented alluvium to similar explosive loading

  3. Going underground

    Energy Technology Data Exchange (ETDEWEB)

    Winqvist, T.; Mellgren, K.-E. (eds.)

    1988-01-01

    Contains over 100 short articles on underground structures and tunneling based largely on Swedish experience. Includes papers on underground workers - attitudes and prejudices, health investigations, the importance of daylight, claustrophobia; excavation, drilling and blasting; hydroelectric power plants; radioactive waste disposal; district heating; oil storage; and coal storage.

  4. A new generation of superconducting solenoids for heavy-ion linac application

    International Nuclear Information System (INIS)

    Ostroumov, P. N.; Kim, S. H.; Lessner, E. S.; Shepard, K. W.; Laxdal, R. E.; Wheatley, R.

    2002-01-01

    The beam dynamics of superconducting (SC) heavy-ion linacs operating in the velocity range below 0.4c require a compact accelerating-focusing lattice. The use of SC solenoids together with SC RF resonators within a common cryostat can solve the real-estate problem. The solenoids must have low fringe fields to avoid magnetic-flux capture in the SC RF resonators. Also, incorporating dipole steering coils together with the SC solenoids in one magnet assembly can increase the compactness of the linac lattice. R and D work has been carried out to determine the feasibility of combining the three elements of high solenoid field, low fringe field, and integral dipole field, into one compact package. A 9-Tesla magnet has been initially designed and will be prototyped, with the goal of eventually developing 14-Tesla solenoids of similar design. The most important design issues are: (1) to minimize stray field in the RF cavity region using SC bucking coils and (2) to achieve adequate mechanical stability of the transverse dipole windings in the presence of forces produced by the solenoid/bucking coil assembly. The assembly, including terminals, switches, and protection circuit, are designed to fit inside a 25-cm diameter helium reservoir. The results of the preliminary design of the solenoid, including numerical simulations of the beam dynamics, are reported

  5. New Generation of Superconducting Solenoids for Heavy-Ion Linac Application

    Science.gov (United States)

    Ostroumov, P. N.; Kim, S. H.; Lessner, E. S.; Shepard, K. W.; Laxdal, R. E.

    2002-01-01

    The beam dynamics of superconducting (SC) heavy-ion linacs operating in the velocity range below 0.4c require a compact accelerating-focusing lattice. The use of SC solenoids together with SC RF resonators within a common cryostat can solve the real-estate problem. The solenoids must have low fringe fields to avoid magnetic-flux capture in the SC RF resonators. Also, incorporating dipole steering coils together with the SC solenoids in one magnet assembly can increase the compactness of the linac lattice. R&D work has been carried out to determine the feasibility of combining the three elements of high solenoid field, low fringe field, and integral dipole field, into one compact package. A 9-Tesla magnet has been initially designed and will be prototyped, with the goal of eventually developing 14-Tesla solenoids of similar design. The most important design issues are: (1) to minimize stray field in the RF cavity region using SC bucking coils and (2) to achieve adequate mechanical stability of the transverse dipole windings in the presence of forces produced by the solenoid/bucking coil assembly. The assembly, including terminals, switches, and protection circuit, are designed to fit inside a 25-cm diameter helium reservoir. The results of the preliminary design of the solenoid, including numerical simulations of the beam dynamics, are reported.

  6. HIE-ISOLDE CRYO-MODULE Assembly - Superconducting Solenoid

    CERN Multimedia

    Leclercq, Yann

    2016-01-01

    Assembly of the cryo-module components in SM18 cleanroom. The superconducting solenoid (housed inside its helium vessel) is cleaned, prepared then installed on the supporting frame of the cryo-module and connected to the helium tank, prior to the assembly of the RF cavities on the structure. The completed first 2 cryo-modules installed inside the HIE-ISOLDE-LINAC ready for beam operation is also shown.

  7. The Compact Muon Solenoid Detector Control System

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    The Compact Muon Solenoid (CMS) is a CERN multi-purpose experiment that exploits the physics of the Large Hadron Collider (LHC). The Detector Control System (DCS) ensures a safe, correct and efficient experiment operation, contributing to the recording of high quality physics data. The DCS is programmed to automatically react to the LHC changes. CMS sub-detector’s bias voltages are set depending on the machine mode and particle beam conditions. A protection mechanism ensures that the sub-detectors are locked in a safe mode whenever a potentially dangerous situation exists. The system is supervised from the experiment control room by a single operator. A small set of screens summarizes the status of the detector from the approximately 6M monitored parameters. Using the experience of nearly two years of operation with beam the DCS automation software has been enhanced to increase the system efficiency. The automation allows now for configuration commands that can be used to automatically pre-configure hardwar...

  8. Cryogenic testing of the TPC superconducting solenoid

    International Nuclear Information System (INIS)

    Green, M.A.; Smits, R.G.; Taylor, J.D.

    1983-06-01

    This report describes the results of a series of tests on the TPC superconducting magnet cryogenic system which occurred during the winter and spring of 1983. The tests occurred at interaction region 2 of the PEP colliding beam facility at the Stanford Linear Accelerator Center (SLAC). The TPC Magnet Cryogenic System which was tested includes the following major components: a remote helium compressor with a full flow liquid nitrogen purification station, 400 meters of high pressure supply and low pressure return lines; and locally a CTi Model 2800 refrigerator with two Sulzer gas bearing turbines, the TPC magnet control dewar, 70 meters of transfer lines, and the TPC thin superconducting solenoid magnet. In addition, there is a conditioner (liquid nitrogen heat exchangers and gas heaters) system for cooldown and warmup of the magnet. This report describes the local cryogenic system and describes the various steps in the cooldown and operation of the TPC magnet. The tests were successful in that they showed that the TPC magnet could be cooled down in 24 hours and the magnet could be operated on the refrigerator or a helium pump with adequate cooling margin. The tests identified problems with the cryogenic system and the 2800 refrigerator. Procedures for successful operation and quenching of the superconducting magnet were developed. 19 references

  9. Application of underground microseismic monitoring for ground failure and secure longwall coal mining operation: A case study in an Indian mine

    Science.gov (United States)

    Ghosh, G. K.; Sivakumar, C.

    2018-03-01

    Longwall mining technique has been widely used around the globe due to its safe mining process. However, mining operations are suspended when various problems arise like collapse of roof falls, cracks and fractures propagation in the roof and complexity in roof strata behaviors. To overcome these colossal problems, an underground real time microseismic monitoring technique has been implemented in the working panel-P2 in the Rajendra longwall underground coal mine at South Eastern Coalfields Limited (SECL), India. The target coal seams appears at the panel P-2 within a depth of 70 m to 76 m. In this process, 10 to 15 uniaxial geophones were placed inside a borehole at depth range of 40 m to 60 m located over the working panel-P2 with high rock quality designation value for better seismic signal. Various microseismic events were recorded with magnitude ranging from -5 to 2 in the Richter scale. The time-series processing was carried out to get various seismic parameters like activity rate, potential energy, viscosity rate, seismic moment, energy index, apparent volume and potential energy with respect to time. The used of these parameters helped tracing the events, understanding crack and fractures propagation and locating both high and low stress distribution zones prior to roof fall occurrence. In most of the cases, the events were divided into three stage processes: initial or preliminary, middle or building, and final or falling. The results of this study reveal that underground microseismic monitoring provides sufficient prior information of underground weighting events. The information gathered during the study was conveyed to the mining personnel in advance prior to roof fall event. This permits to take appropriate action for safer mining operations and risk reduction during longwall operation.

  10. ITER Central Solenoid Module Fabrication

    Energy Technology Data Exchange (ETDEWEB)

    Smith, John [General Atomics, San Diego, CA (United States)

    2016-09-23

    The fabrication of the modules for the ITER Central Solenoid (CS) has started in a dedicated production facility located in Poway, California, USA. The necessary tools have been designed, built, installed, and tested in the facility to enable the start of production. The current schedule has first module fabrication completed in 2017, followed by testing and subsequent shipment to ITER. The Central Solenoid is a key component of the ITER tokamak providing the inductive voltage to initiate and sustain the plasma current and to position and shape the plasma. The design of the CS has been a collaborative effort between the US ITER Project Office (US ITER), the international ITER Organization (IO) and General Atomics (GA). GA’s responsibility includes: completing the fabrication design, developing and qualifying the fabrication processes and tools, and then completing the fabrication of the seven 110 tonne CS modules. The modules will be shipped separately to the ITER site, and then stacked and aligned in the Assembly Hall prior to insertion in the core of the ITER tokamak. A dedicated facility in Poway, California, USA has been established by GA to complete the fabrication of the seven modules. Infrastructure improvements included thick reinforced concrete floors, a diesel generator for backup power, along with, cranes for moving the tooling within the facility. The fabrication process for a single module requires approximately 22 months followed by five months of testing, which includes preliminary electrical testing followed by high current (48.5 kA) tests at 4.7K. The production of the seven modules is completed in a parallel fashion through ten process stations. The process stations have been designed and built with most stations having completed testing and qualification for carrying out the required fabrication processes. The final qualification step for each process station is achieved by the successful production of a prototype coil. Fabrication of the first

  11. Plasma shape control by pulsed solenoid on laser ion source

    Science.gov (United States)

    Sekine, M.; Ikeda, S.; Romanelli, M.; Kumaki, M.; Fuwa, Y.; Kanesue, T.; Hayashizaki, N.; Lambiase, R.; Okamura, M.

    2015-09-01

    A Laser ion source (LIS) provides high current heavy ion beams with a very simple mechanical structure. Plasma is produced by a pulsed laser ablation of a solid state target and ions are extracted by an electric field. However, it was difficult to manipulate the beam parameters of a LIS, since the plasma condition could only be adjusted by the laser irradiation condition. To enhance flexibility of LIS operation, we employed a pulsed solenoid in the plasma drift section and investigated the effect of the solenoid field on singly charged iron beams. The experimentally obtained current profile was satisfactorily controlled by the pulsed magnetic field. This approach may also be useful to reduce beam emittance of a LIS.

  12. Plasma shape control by pulsed solenoid on laser ion source

    International Nuclear Information System (INIS)

    Sekine, M.; Ikeda, S.; Romanelli, M.; Kumaki, M.; Fuwa, Y.; Kanesue, T.; Hayashizaki, N.; Lambiase, R.; Okamura, M.

    2015-01-01

    A Laser ion source (LIS) provides high current heavy ion beams with a very simple mechanical structure. Plasma is produced by a pulsed laser ablation of a solid state target and ions are extracted by an electric field. However, it was difficult to manipulate the beam parameters of a LIS, since the plasma condition could only be adjusted by the laser irradiation condition. To enhance flexibility of LIS operation, we employed a pulsed solenoid in the plasma drift section and investigated the effect of the solenoid field on singly charged iron beams. The experimentally obtained current profile was satisfactorily controlled by the pulsed magnetic field. This approach may also be useful to reduce beam emittance of a LIS

  13. E-beam heated linear solenoid reactors

    International Nuclear Information System (INIS)

    Benford, J.; Bailey, V.; Oliver, D.

    1976-01-01

    A conceptual design and system analysis shows that electron beam heated linear solenoidal reactors are attractive for near term applications which can use low gain fusion sources. Complete plant designs have been generated for fusion based breeders of fissile fuel over a wide range of component parameters (e.g., magnetic fields, reactor lengths, plasma densities) and design options (e.g., various radial and axial loss mechanisms). It appears possible that a reactor of 100 to 300 meters length operating at power levels of 1000 MWt can economically produce 2000 to 8000 kg/yr of 233 U to supply light water reactor fuel needs beyond 2000 A.D. Pure fusion reactors of 300 to 500 meter lengths are possible. Physics and operational features of reactors are described. Beam heating by classical and anomalous energy deposition is reviewed. The technology of the required beams has been developed to MJ/pulse levels, within a factor of 20 of that needed for full scale production reactors. The required repetitive pulsing appears practical

  14. Form coefficient of helical toroidal solenoids

    International Nuclear Information System (INIS)

    Amelin, V.Z.; Kunchenko, V.B.

    1982-01-01

    For toroidal solenoids with continuous spiral coil, winded according to the laws of equiinclined and simple cylindrical spirals with homogeneous, linearly increasing to the coil periphery and ''Bitter'' distribution of current density, the analytical expressions for the dependence between capacity consumed and generated magnetic field, expressions for coefficients of form similar to Fabry coefficient for cylindrical solenoids are obtained and dependence of the form coefficient and relative volume of solenoid conductor on the number of revolutions of screw line per one circumvention over the large torus radius is also investigated. Analytical expressions of form coefficients and graphical material permit to select the optimum geometry as to capacity consumed both for spiral (including ''force-free'') and conventional toroidal solenoids of magnetic systems in thermonulear installations

  15. Arrival of the ATLAS solenoid from Japan

    CERN Multimedia

    Patrice Loïez

    2001-01-01

    Photo 01: L. to r.: Photo 01: L. to r.: Herman ten Kate (Magnet Project Leader), Takahiko Kondo (KEK, Solenoid Project Leader), Peter Jenni (Spokesperson). Photo 02: (truck on the right side) with the LAr barrel calorimeter cryostat (also built in Japan) on the left side. From left to right are the following ATLAS people: Herman ten Kate (Magnet Project Leader), Marzio Nessi (Technical Coordinator), Takahiko Kondo (KEK, Solenoid Project Leader), Peter Jenni (Spokesperson)

  16. Advances in laser solenoid fusion reactor design

    International Nuclear Information System (INIS)

    Steinhauer, L.C.; Quimby, D.C.

    1978-01-01

    The laser solenoid is an alternate fusion concept based on a laser-heated magnetically-confined plasma column. The reactor concept has evolved in several systems studies over the last five years. We describe recent advances in the plasma physics and technology of laser-plasma coupling. The technology advances include progress on first walls, inner magnet design, confinement module design, and reactor maintenance. We also describe a new generation of laser solenoid fusion and fusion-fission reactor designs

  17. Concepts of plasticity in solenoid stress analysis

    International Nuclear Information System (INIS)

    Garmestani, H.; Vaghar, M.R.; Markiewicz, W.D.

    1994-01-01

    The concepts of plasticity are reviewed in the context of solenoid magnet design. The von Mises and Hill yield functions are introduced and related to flow rules. The derivation of equations for an elastic-plastic analysis of solenoids is discussed. Material properties are derived from Nb 3 Sn conductors and used in example calculations. The results of elastic-plastic analyses are compared with those of elastic analyses under various assumptions

  18. Lessons Learned for the MICE Coupling Solenoid from the MICE Spectrometer Solenoids

    International Nuclear Information System (INIS)

    Green, Michael A.; Wang, Li; Pan, Heng; Wu, Hong; Guo, Xinglong; Li, S.Y.; Zheng, S.X.; Virostek, Steve P.; DeMello, Allen J.; Li, Derun; Trillaud, Frederick; Zisman, Michael S.

    2010-01-01

    Tests of the spectrometer solenoids have taught us some important lessons. The spectrometer magnet lessons learned fall into two broad categories that involve the two stages of the coolers that are used to cool the magnets. On the first spectrometer magnet, the problems were centered on the connection of the cooler 2nd-stage to the magnet cold mass. On the first test of the second spectrometer magnet, the problems were centered on the cooler 1st-stage temperature and its effect on the operation of the HTS leads. The second time the second spectrometer magnet was tested; the cooling to the cold mass was still not adequate. The cryogenic designs of the MICE and MuCOOL coupling magnets are quite different, but the lessons learned from the tests of the spectrometer magnets have affected the design of the coupling magnets.

  19. Superconducting solenoids for an international muon cooling experiment

    International Nuclear Information System (INIS)

    Green, M.A.; Rey, J.M.

    2002-01-01

    The international muon ionization cooling experiment MICE will consist of two focusing cooling cells and a pair of uniform field solenoids used for particle identification and emittance measurements. The 2.75-meter long cooling cells have a pair of field flip coils and a coupling coil. The 0.52-meter diameter field flip coils surround an absorber that removes transverse and longitudinal momentum from the muons to be cooled. The beam in the absorber is at a minimum beta point so that scattering of the muons is minimized. The 1.7-meter diameter coupling coils are outside of conventional 201.25 MHz RF cavities that accelerate the muons putting longitudinal momentum into the muons without putting back the transverse momentum into the beam. A third set of flip coils helps the muon beam transition from and to the experimental solenoids. The 0.6-meter diameter experimental solenoids have a uniform field region (good to about 1 part in 1000) that is 1.3-meters long. The MICE experiment magnets must operate as a single unit so that the field profile will produce the maximum muon cooling

  20. Regulated underground storage tanks

    International Nuclear Information System (INIS)

    1992-06-01

    This guidance package is designed to assist DOE Field operations by providing thorough guidance on the underground storage tank (UST) regulations. [40 CFR 280]. The guidance uses tables, flowcharts, and checklists to provide a ''roadmap'' for DOE staff who are responsible for supervising UST operations. This package is tailored to address the issues facing DOE facilities. DOE staff should use this guidance as: An overview of the regulations for UST installation and operation; a comprehensive step-by-step guidance for the process of owning and operating an UST, from installation to closure; and a quick, ready-reference guide for any specific topic concerning UST ownership or operation

  1. Rokibaar Underground = Rock bar Underground

    Index Scriptorium Estoniae

    2008-01-01

    Rokibaari Underground (Küütri 7, Tartu) sisekujundus, mis pälvis Eesti Sisearhitektide Liidu 2007. a. eripreemia. Sisearhitekt: Margus Mänd (Tammat OÜ). Margus Männist, tema tähtsamad tööd. Plaan, 5 värv. vaadet, foto M. Männist

  2. Underground Politics

    DEFF Research Database (Denmark)

    Galis, Vasilis; Summerton, Jane

    of various kinds, as well as for identifying and displacing undesired individuals/groups/bodies. A case in point is a recently-established police project (REVA) in Sweden for strengthening the so-called internal border control. Specifically, several underground stations in Stockholm now have checkpoints......Public spaces are often contested sites involving the political use of sociomaterial arrangements to check, control and filter the flow of people (see Virilio 1977, 1996). Such arrangements can include configurations of state-of-the-art policing technologies for delineating and demarcating borders...... status updates on identity checks at the metro stations in Stockholm and reports on locations and time of ticket controls for warning travelers. Thus the attempts by authorities to exert control over the (spatial) arena of the underground is circumvented by the effective developing of an alternative...

  3. HB+ prepares for insertion into the CMS solenoid

    CERN Multimedia

    Dave Barney, CERN

    2006-01-01

    With calibration of the first half of the barrel Hadron Calorimeter (HB+) complete (using a radioactive source), preparations begin for its insertion into the solenoid for the Magnet Test and Cosmic Challenge (MTCC). It was moved out of its alcove at the beginning of March - a non-trivial (but completely successful) operation due to the proximity of one of the barrel yoke rings (YB+1). The other half of the barrel Hadron Calorimeter (HB-) and one of the endcaps (HE+) should also be calibrated before the MTCC.

  4. Growth techniques for monolithic YBCO solenoidal magnets

    International Nuclear Information System (INIS)

    Scruggs, S.J.; Putman, P.T.; Fang, H.; Alessandrini, M.; Salama, K.

    2006-01-01

    The possibility of growing large single domain YBCO solenoids by the use of a large seed has been investigated. There are two known methods for producing a similar solenoid. This first is a conventional top seeded melt growth process followed by a post processing machining step to create the bore. The second involves using multiple seeds spaced around the magnet bore. The appeal of the new technique lies in decreasing processing time compared to the single seed technique, while avoiding alignment problems found in the multiple seeding technique. By avoiding these problems, larger diameter monoliths can be produced. Large diameter monoliths are beneficial because the maximum magnetic field produced by a trapped field magnet is proportional to the radius of the sample. Furthermore, the availability of trapped field magnets with large diameter could enable their use in applications that traditionally have been considered to require wound electromagnets, such as beam bending magnets for particle accelerators or electric propulsion. A comparison of YBCO solenoids grown by the use of a large seed and grown by the use of two small seeds simulating multiple seeding is made. Trapped field measurements as well as microstructure evaluation were used in characterization of each solenoid. Results indicate that high quality growth occurs only in the vicinity of the seeds for the multiple seeded sample, while the sample with the large seeded exhibited high quality growth throughout the entire sample

  5. Successful mapping of the solenoid magnet

    CERN Multimedia

    Aleksa, M.

    The ATLAS solenoid coil is about 5.3m long, has a diameter of 2.5m and is designed to deliver a magnetic field of approximately 2T for the ATLAS inner detector. The superconducting solenoid coil has been integrated inside the LAr barrel cryostat and was installed at its final position inside the cavern in November 2005. This summer - after completion of the extended barrel calorimeters and before the installation of the inner detector - the end cap calorimeters (LAr end caps and Tile extended barrels) were moved for the first time into their final position in order to create conditions as close as possible to final for the solenoid tests and for mapping the field inside the solenoid bore. Design and construction of the mapping machine The requirement on the absolute precision of the field measurements are 0.05% on the field integrals seen by particles; if this is achieved the momentum error coming from insufficient knowledge of the magnetic field will be negligible compared to the error stemming from the inn...

  6. Compensation of oscillation coupling induced by solenoids

    International Nuclear Information System (INIS)

    Zelinskij, A.Yu.; Karnaukhov, I.M.; Shcherbakov, A.A.

    1988-01-01

    Methods for construction of various schemes of oscillation coupling compensation, induced by solenoids in charged particle storage rings, are described. Peculiarities of magnetic structure, enabling to localize oscillation coupling in wide energy range are discussed. Results of calculation of compensation schemes for design of NR-2000 storage ring spin rotation are presented

  7. Flowfield Analysis of a Pneumatic Solenoid Valve

    Directory of Open Access Journals (Sweden)

    Sheam-Chyun Lin

    2018-07-01

    Full Text Available Pneumatic solenoid valve has been widely used in the vehicle control systems for meeting the rapid-reaction demand triggered by the dynamic conditions encountered during the driving course of vehicle. For ensuring the safety of human being, the reliable and effective solenoid valve is in great demand to shorten the reaction time and thus becomes the topic of this research. This numerical study chooses a commercial 3/2-way solenoid valve as the reference valve for analysing its performance. At first, CFD software Fluent is adopted to simulate the flow field associated with the valve configuration. Then, the comprehensive flow visualization is implemented to identify the locations of adverse flow patterns. Accordingly, it is found that a high-pressure region exists in the zone between the nozzle exit and the top of iron core. Thereafter, the nozzle diameter and the distance between nozzle and spool are identified as the important design parameters for improving the pressure response characteristics of valve. In conclusion, this work establishes a rigorous and systematic CFD scheme to evaluate the performance of pneumatic solenoid valve.

  8. Effect of the solenoid in various conditions of the laser ion source at Brookhaven National Laboratory

    Science.gov (United States)

    Ikeda, S.; Kumaki, M.; Kanesue, T.; Okamura, M.

    2016-02-01

    In the laser ion source (LIS) at the Brookhaven National Laboratory (BNL), a solenoid is used to guide the laser ablation plasma and modulate the extracted beam current. Many types of ion species are guided. In some cases, the plasma plume is injected into the solenoid away from the solenoidal axis. To investigate the effects of the solenoid on the beam extracted from the plasma that has different properties, the beam current was measured in the setup of the LIS at the BNL. The beam current of Li, Al, Si, Fe, and Au increased when the magnetic field was applied. For most of the species the peak current and the total charge within a single beam pulse increased around 10 times with a magnetic field less than 100 G. In addition, for some species the rate of increase of the peak currents became smaller when the magnetic flux densities were larger than certain values depending on the species. In this case, the current waveforms were distorted. At the same magnetic field value, the field was more effective on lighter species than on heavier ones. When plasma was injected offset from the axis of the solenoid, peak current and total charge became half of those without offset. The experimental data are useful for the operation of the LIS at the BNL.

  9. Effect of the solenoid in various conditions of the laser ion source at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Ikeda, S.; Kumaki, M.; Kanesue, T.; Okamura, M.

    2016-01-01

    In the laser ion source (LIS) at the Brookhaven National Laboratory (BNL), a solenoid is used to guide the laser ablation plasma and modulate the extracted beam current. Many types of ion species are guided. In some cases, the plasma plume is injected into the solenoid away from the solenoidal axis. To investigate the effects of the solenoid on the beam extracted from the plasma that has different properties, the beam current was measured in the setup of the LIS at the BNL. The beam current of Li, Al, Si, Fe, and Au increased when the magnetic field was applied. For most of the species the peak current and the total charge within a single beam pulse increased around 10 times with a magnetic field less than 100 G. In addition, for some species the rate of increase of the peak currents became smaller when the magnetic flux densities were larger than certain values depending on the species. In this case, the current waveforms were distorted. At the same magnetic field value, the field was more effective on lighter species than on heavier ones. When plasma was injected offset from the axis of the solenoid, peak current and total charge became half of those without offset. The experimental data are useful for the operation of the LIS at the BNL

  10. Experimental study on coil of direct action solenoid valve with temperature increasing

    International Nuclear Information System (INIS)

    Wang Lu; Liu Qianfeng; Bo Hanliang

    2012-01-01

    Hydraulic control rod drive technology (HCRDT) is a newly invented patent and Institute of Nuclear and New Energy Technology of Tsinghua University owns HCRDT's independent intellectual property rights. The integrated valve which is made up of three direct action solenoid valves is the key part of this technology, so the performance of the solenoid valve directly affects the function of the integrated valve and the HCRDT. Based on the conditions occurring in the operation of the control rod hydraulic drive system, the coil of the direct action solenoid valve with temperature increasing was studied by the experiment and analyzed by ANSYS code. The result shows that the temperature of the coil for the solenoid valve increases with the current increasing firstly. The temperature of the inner wall of the coil is higher than that of the exterior wall. The temperature of the middle coil is higher than that of the edge of the coil. The design of the direct action solenoid valve can be optimized. (authors)

  11. Remote Operated Vehicle geophysical surveys on land (underground), air and submarine archaeology: General peculiarities of processing and interpretation

    Science.gov (United States)

    Eppelbaum, Lev

    2016-04-01

    The last Remote Operation Vehicles (ROV) generation - small and maneuvering vehicles with different geophysical sensors - can fly at levels of a few meters (and even tens of centimeters) over the earth's surface, to move on the earth's surface and in the inaccessible underground areas and to explore in underwater investigations (e.g., Mindel and Bingham, 2001; Rowlands and Sarris, 2006; Wilson et al., 2006; Rigaud, 2007; Eppelbaum, 2008; Patterson and Brescia, 2008; Sarris, 2008; Wang et al., 2009; Wu and Tian, 2010; Stall, 2011; Tezkan et al., 2011; Winn et al., 2012; El-Nahhas, 2013; Hadjimitsis et al., 2013; Hajiyev and Vural, 2013; Hugenholtz et al., 2013; Petzke et al., 2013; Pourier et al., 2013; Casana et al., 2014; Silverberg and Bieber, 2014). Such geophysical investigations should have an extremely low exploitation cost and can observe surface practically inaccessible archaeological sites (swampy areas, dense vegetation, rugged relief, over the areas of world recognized religious and cultural artifacts (Eppelbaum, 2010), etc.). Finally, measurements of geophysical fields at different observation levels could provide a new unique geological-geophysical information (Eppelbaum and Mishne, 2011). Let's consider ROV airborne magnetic measurements as example. The modern magnetometric equipment enables to carry out magnetic measurements with a frequency of 50 times per second (and more) that taking into account the low ROV flight speed provides a necessary density of observations. For instance, frequency of observation of 50 times per second by ROV velocity of 40 km/hour gives density of observation about 0.2 m. It is obvious that the calculated step between observation points is more than sufficient one. Such observations will allow not only reduce the influence of some small artificial sources of noise, but also to obtain some additional data necessary for quantitative analysis (some interpretation methodologies need to have observations at two levels; upward

  12. A study of ISO Solenoid Valve with static and dynamic characteristics

    International Nuclear Information System (INIS)

    Jeon, Y. S.; Ju, M. J.; Oh, Y. C.; Kim, D. S.

    2009-01-01

    The technology of ISO Solenoid Valves is now considered as a core technology in the fields of the production line of semi-conductor chips and the ISO fluid chips for medical applications. And ISO Solenoid Valves, which operate by compressed air, are characterized by high speed response, great repeatability and that the pressure on the cross sectional area of poppet is kept constant regardless of the fluctuation of the pressure exerted on the ports. The primary objective of this study is to compare the optimally designed Solenoid Valve with the actually produced one and to design a power saving circuit which can highly improve the efficiency by providing optimal current according to mechanical load.

  13. Solenoidal Fields for Ion Beam Transport and Focusing

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Edward P.; Leitner, Matthaeus

    2007-11-01

    numerical results obtained with it are also presented. Details of design, fabrication, installation, and operation of magnet systems are not included; here we are concerned with calculations that precede or supplement detailed design. Mathematical derivations are presented with only a moderate number of steps. While there is no claim of originality, except for various numerical approximations and a conceptual induction module design in section 20, many of the results and discussions are not readily available elsewhere. Our primary topic is axisymmetric solenoidal systems with no magnetic materials. These simplifying features allow useful analytical calculations, which occupy sections 2-13. Deviations from axisymmetry are considered in sections 14, 15, 21, 22, and 23 and the effects of magnetic materials are treated in sections 16-20. Since magnetic aberrations are mixed with geometric aberrations in computing ion orbits, section 22 on the ion equations of motion in an arbitrary field is included.

  14. Laser ion source with solenoid field

    International Nuclear Information System (INIS)

    Kanesue, Takeshi; Okamura, Masahiro; Fuwa, Yasuhiro; Kondo, Kotaro

    2014-01-01

    Pulse length extension of highly charged ion beam generated from a laser ion source is experimentally demonstrated. The laser ion source (LIS) has been recognized as one of the most powerful heavy ion source. However, it was difficult to provide long pulse beams. By applying a solenoid field (90 mT, 1 m) at plasma drifting section, a pulse length of carbon ion beam reached 3.2 μs which was 4.4 times longer than the width from a conventional LIS. The particle number of carbon ions accelerated by a radio frequency quadrupole linear accelerator was 1.2 × 10 11 , which was provided by a single 1 J Nd-YAG laser shot. A laser ion source with solenoid field could be used in a next generation heavy ion accelerator

  15. Laser ion source with solenoid field

    Science.gov (United States)

    Kanesue, Takeshi; Fuwa, Yasuhiro; Kondo, Kotaro; Okamura, Masahiro

    2014-11-01

    Pulse length extension of highly charged ion beam generated from a laser ion source is experimentally demonstrated. The laser ion source (LIS) has been recognized as one of the most powerful heavy ion source. However, it was difficult to provide long pulse beams. By applying a solenoid field (90 mT, 1 m) at plasma drifting section, a pulse length of carbon ion beam reached 3.2 μs which was 4.4 times longer than the width from a conventional LIS. The particle number of carbon ions accelerated by a radio frequency quadrupole linear accelerator was 1.2 × 1011, which was provided by a single 1 J Nd-YAG laser shot. A laser ion source with solenoid field could be used in a next generation heavy ion accelerator.

  16. Cross section of the CMS solenoid

    CERN Multimedia

    Tejinder S. Virdee, CERN

    2005-01-01

    The pictures show a cross section of the CMS solenoid. One can see four layers of the superconducting coil, each of which contains the superconductor (central part, copper coloured - niobium-titanium strands in a copper coating, made into a "Rutherford cable"), surrounded by an ultra-pure aluminium as a magnetic stabilizer, then an aluminium alloy as a mechanical stabilizer. Besides the four layers there is an aluminium mechanical piece that includes pipes that transport the liquid helium.

  17. Bistable (latching) solenoid actuated propellant isolation valve

    Science.gov (United States)

    Wichmann, H.; Deboi, H. H.

    1979-01-01

    The design, fabrication, assembly and test of a development configuration bistable (latching) solenoid actuated propellant isolation valve suitable for the control hydrazine and liquid fluorine to an 800 pound thrust rocket engine is described. The valve features a balanced poppet, utilizing metal bellows, a hard poppet/seat interface and a flexure support system for the internal moving components. This support system eliminates sliding surfaces, thereby rendering the valve free of self generated particles.

  18. Stable particle motion in a linear accelerator with solenoid focusing

    International Nuclear Information System (INIS)

    Wadlinger, E.A.

    1979-01-01

    The equation governing stable particle motion in a linear ion accelerator containing discrete rf and either discrete or continuous solenoid focusing was derived. It was found for discrete solenoid focusing that: cos μ = (1 + dΔ) cos theta/2 + (lΔ/theta - dtheta/2l - thetaΔd 2 /4l) sin theta/2, Δ = 1/f and l + 2d = βlambda, where μ, theta, f, l, and d are the phase advance per cell, precession angle in the solenoid, focal length of the rf lens, length of the solenoid in one cell, and the drift distance between the center of the rf gap and the effective edge of the solenoid. The relation for a continuous solenoid is found by setting d equal to zero. The boundaries of the stability region for theta vs Δ with fixed l and d are obtained when cos μ =+-1

  19. Survey of the laser-solenoid fusion reactor

    International Nuclear Information System (INIS)

    Amherd, N.A.

    1975-09-01

    This report surveys the prospects for a laser-solenoid fusion reactor. A sample reactor and scaling laws are used to describe the concept's characteristics. Experimental results are reviewed, and the laser and magnet technologies that undergird the laser-solenoid concept are analyzed. Finally, a systems analysis of fusion power reactors is given, including a discussion of direct conversion and fusion-fission effects, to ascertain the system attributes of the laser-solenoid configuration

  20. An elementary argument for the magnetic field outside a solenoid

    OpenAIRE

    Pathak, Aritro

    2016-01-01

    The evaluation of the magnetic field inside and outside a uniform current density infinite solenoid of uniform cross-section is an elementary problem in classical electrodynamics that all undergraduate Physics students study. Symmetry properties of the cylinder and the judicious use of Ampere's circuital law leads to correct results; however it does not explain why the field is non zero for a finite length solenoid, and why it vanishes as the solenoid becomes infinitely long. An argument is p...

  1. Evaluation of advanced turbomachinery for underground pumped hydroelectric storage. Part 3. Multistage unregulated pump/turbines for operating heads of 1000 to 1500 m

    Energy Technology Data Exchange (ETDEWEB)

    Frigo, A.A.; Pistner, C.

    1980-08-01

    This is the final report in a series of three on studies of advanced hydraulic turbomachinery for underground pumped hydroelectric storage. All three reports address Francis-type, reversible pump/turbines. The first report covered single-stage regulated units; the second report covered two-stage regulated units; the present report covers multistage unregulated units. Multistage unregulated pump/turbines offer an economically attractive option for heads of 1000 to 1500 m. The feasibility of developing such machines for capacities up to 500 MW and operating heads up to 1500 m has been evaluated. Preliminary designs have been generated for six multistage pump/turbines. The designs are for nominal capacities of 350 and 500 MW and for operating heads of 1000, 1250, and 1500 m. Mechanical, hydraulic, and economic analyses indicate that these machines will behave according to the criteria used to design them and that they can be built at a reasonable cost with no unsolvable problems. Efficiencies of 85.8% and 88.5% in the generating and pumping modes, respectively, can be expected for the 500-MW, 1500-m unit. Performances of the other five machines are at least comparable, and usually better. Over a 1000 to 1500-m head range, specific $/kW costs of the pump/turbines in mid-1978 US dollars vary from 19.0 to 23.1 for the 500-MW machines, and from 21.0 to 24.1 for the 350-MW machines.

  2. Evaluation of the risk to underground mine personnel due to the rockmass response to continuous mining operations.

    CSIR Research Space (South Africa)

    Van Aswegen, G

    2001-11-01

    Full Text Available The objective of the study was to determine whether there is a difference in the seismic response of the rockmass between 11-day mining cycle and full calendar operations - FULCO. A literature survey was useful to gain insight in the time dependent...

  3. Approximate theory the electromagnetic energy of solenoid in special relativity

    International Nuclear Information System (INIS)

    Prastyaningrum, I; Kartikaningsih, S.

    2017-01-01

    Solenoid is a device that is often used in electronic devices. A solenoid is electrified will cause a magnetic field. In our analysis, we just focus on the electromagnetic energy for solenoid form. We purpose to analyze by the theoretical approach in special relativity. Our approach is begun on the Biot Savart law and Lorentz force. Special theory relativity can be derived from the Biot Savart law, and for the energy can be derived from Lorentz for, by first determining the momentum equation. We choose the solenoid form with the goal of the future can be used to improve the efficiency of the electrical motor. (paper)

  4. The effects of realistic pancake solenoids on particle transport

    Science.gov (United States)

    Gu, X.; Okamura, M.; Pikin, A.; Fischer, W.; Luo, Y.

    2011-05-01

    Solenoids are widely used to transport or focus particle beams. Usually, they are assumed as being ideal solenoids with a high axial-symmetry magnetic field. Using the Vector Fields Opera program, we modeled asymmetrical solenoids with realistic geometry defects, caused by finite conductor and current jumpers. Their multipole magnetic components were analyzed with the Fourier fit method; we present some possible optimized methods for them. We also discuss the effects of "realistic" solenoids on low energy particle transport. The findings in this paper may be applicable to the lower energy particle transport system design.

  5. Functional and genomic analyses of alpha-solenoid proteins.

    Directory of Open Access Journals (Sweden)

    David Fournier

    Full Text Available Alpha-solenoids are flexible protein structural domains formed by ensembles of alpha-helical repeats (Armadillo and HEAT repeats among others. While homology can be used to detect many of these repeats, some alpha-solenoids have very little sequence homology to proteins of known structure and we expect that many remain undetected. We previously developed a method for detection of alpha-helical repeats based on a neural network trained on a dataset of protein structures. Here we improved the detection algorithm and updated the training dataset using recently solved structures of alpha-solenoids. Unexpectedly, we identified occurrences of alpha-solenoids in solved protein structures that escaped attention, for example within the core of the catalytic subunit of PI3KC. Our results expand the current set of known alpha-solenoids. Application of our tool to the protein universe allowed us to detect their significant enrichment in proteins interacting with many proteins, confirming that alpha-solenoids are generally involved in protein-protein interactions. We then studied the taxonomic distribution of alpha-solenoids to discuss an evolutionary scenario for the emergence of this type of domain, speculating that alpha-solenoids have emerged in multiple taxa in independent events by convergent evolution. We observe a higher rate of alpha-solenoids in eukaryotic genomes and in some prokaryotic families, such as Cyanobacteria and Planctomycetes, which could be associated to increased cellular complexity. The method is available at http://cbdm.mdc-berlin.de/~ard2/.

  6. ITER central solenoid manufacturing R and D

    International Nuclear Information System (INIS)

    Jay Jayakumar, R.; Tsuji, H.; Ohsaki, O.

    2001-01-01

    The International Thermonuclear Experimental Reactor (ITER) Engineering Design Activity (EDA) includes the development of high performance superconductors, high current joints between superconducting cables and insulating materials. Also in the EDA, the resulting products of this R and D are incorporated in a Central Solenoid Model Coil which utilizes full size conductors. The manufacturing of the model coil and components has led to the development of the design, materials, tooling and process which are fully applicable to the manufacture of the ITER relevant CS coil. The R and D is essentially complete and final stages of the CS Model Coil manufacturing are underway. (author)

  7. ITER central solenoid manufacturing R and D

    International Nuclear Information System (INIS)

    Jayakumar, R.J.; Tsuji, H.; Ohsaki, O.

    1999-01-01

    The International Thermonuclear Experimental Reactor (ITER) Engineering Design Activity (EDA) includes the development of high performance superconductors, high current joints between superconducting cables and insulating materials. Also in the EDA, the resulting products of this R and D are incorporated in a Central Solenoid Model Coil which utilizes full size conductors. The manufacturing of the model coil and components has led to the development of the design, materials, tooling and process which are fully applicable to the manufacture of the ITER relevant CS coil. The R and D is essentially complete and final stages of the CS Model Coil manufacturing are underway. (author)

  8. Calculus of the Cryebis 2 supraconductor solenoid

    International Nuclear Information System (INIS)

    Levy, G.

    1985-01-01

    This report describes the design of the superconducting solenoid CRYEBIS 2. With the prescribed parameters (5 Teslas central field, 120mm for inner diameter, 1600 mm for length), one determinates the dimensions of coil, its energy, the conductor, the working point of the magnet with its critical limits (intensity, field, temperature). The superconducting switch is calculated in the same manner. The study of a quench shows the good behaviour of the coil which is always safe even the detection system is in failure. In final, the mechanical stresses are verified lower than yield strength [fr

  9. Conceptual design of a 20 Tesla pulsed solenoid for a laser solenoid fusion reactor

    International Nuclear Information System (INIS)

    Nolan, J.J.; Averill, R.J.

    1977-01-01

    Design considerations are described for a strip wound solenoid which is pulsed to 20 tesla while immersed in a 20 tesla bias field so as to achieve within the bore of the pulsed solenoid at net field sequence starting at 20 tesla and going first down to zero, then up to 40 tesla, and finally back to 20 tesla in a period of about 5 x 10 -3 seconds. The important parameters of the solenoid, e.g., aperture, build, turns, stored and dissipated energy, field intensity and powering circuit, are given. A numerical example for a specific design is presented. Mechanical stresses in the solenoid and the subsequent choice of materials for coil construction are discussed. Although several possible design difficulties are not discussed in this preliminary report of a conceptual magnet design, such as uniformity of field, long-term stability of insulation under neutron bombardment and choice of structural materials of appropriate tensile strength and elasticity to withstand magnetic forces developed, these questions are addressed in detail in the complete design report and in part in reference one. Furthermore, the authors feel that the problems encountered in this conceptual design are surmountable and are not a hindrance to the construction of such a magnet system

  10. Alternative connections for the large MFTF-B solenoids

    International Nuclear Information System (INIS)

    Owen, E.W.; Shimer, D.W.; Wang, S.T.

    1983-01-01

    The MFTF-B central-cell solenoids are a set of twelve closely coupled, large superconducting magnets with similar but not exactly equal currents. Alternative methods of connecting them to their power supplies and dump resistors are investigated. The circuits are evaluated for operating conditions and fault conditions. The factors considered are the voltage to ground during a dump, short circuits, open circuits, quenches, and failure of the protection system to detect a quench. Of particular interest are the current induced in coils that remain superconducting when one or more coils quench. The alternative connections include separate power supplies, combined power supplies, individual dump resistors, series dump resistors and combinations of these. A new circuit that contains coupling resistors is proposed. The coupling resistors do not affect normal fast dumps but reduce the peak induced currents while also reducing the energy rating of the dump resistors. Another novel circuit, the series circuit with diodes, is discussed in detail

  11. Construction of compact FEM using solenoid-induced helical wiggler

    International Nuclear Information System (INIS)

    Ohigashi, N.; Tsunawaki, Y.; Fujita, M.; Imasaki, K.; Mima, K.; Nakai, S.

    2003-01-01

    A prototype of compact Free-Electron Maser (FEM) has been designed for the operation in a usual small laboratory which does not have electric source capacity available enough. The electron energy is 60-120 keV. As it is lower, stronger guiding magnetic field is necessary in addition to wiggler field. To fulfil this condition a solenoid-induced helical wiggler is applied from the viewpoint of saving the electric power of restricted source capacity. The wiggler, for example, with the period of 12 mm creates the field of 92 G in the guiding field of 3.2 kG. The whole system of FEM has been just constructed in a small-scale laboratory. It is so small to occupy the area of 0.7x2.9 m 2

  12. Behaviour of large cylindrical drift chambers in a superconducting solenoid

    International Nuclear Information System (INIS)

    Boer, W. de; Fues, W.; Grindhammer, G.; Kotthaus, R.; Lierl, H.; Moss, L.

    1980-04-01

    We describe the construction and behaviour of a set of cylindrical drift chambers operating inside a superconducting solenoid with a central magnetic field of 1.3 T. The chambers are part of the 4 π detector CELLO at the e + e - storage ring PETRA in Hamburg. The chambers were designed without field shaping to keep them as simple as possible. In order to parametrize accurately the nonlinear space-time relation, we used a computer simulation of the drift process in inhomogenous electric and magnetic fields. With such a parametrization we achieved a resolution of 210 μm, averaged over the whole drift cell and angles of incidence up to 30 0 . (orig.)

  13. Development of large high current density superconducting solenoid magnets for use in high energy physics experiments

    International Nuclear Information System (INIS)

    Green, M.A.

    1977-05-01

    The development of a unique type of large superconducting solenoid magnet, characterized by very high current density windings and a two-phase helium tubular cooling system is described. The development of the magnet's conceptual design and the construction of two test solenoids are described. The successful test of the superconducting coil and its tubular cooling refrigeration system is presented. The safety, environmental and economic impacts of the test program on future developments in high energy physics are shown. Large solid angle particle detectors for colliding beam physics will analyze both charged and neutral particles. In many cases, these detectors will require neutral particles, such as gamma rays, to pass through the magnet coil with minimum interaction. The magnet coils must be as thin as possible. The use of superconducting windings allows one to minimize radiation thickness, while at the same time maximizing charged particle momentum resolution and saving substantial quantities of electrical energy. The results of the experimental measurements show that large high current density solenoid magnets can be made to operate at high stored energies. The superconducting magnet development described has a positive safety and environmental impact. The use of large high current density thin superconducting solenoids has been proposed in two high energy physics experiments to be conducted at the Stanford Linear Accelerator Center and Cornell University as a result of the successful experiments described

  14. Design of permanent magnetic solenoids for REGAE

    Energy Technology Data Exchange (ETDEWEB)

    Gehrke, Tim

    2013-10-15

    The Relativistic Electron Gun for Atomic Exploration (REGAE) is a small linear accelerator at DESY in Hamburg, which produces short, low emittance electron bunches. It is originally designed and built for ultrafast electron diffraction (UED) within the framework of the Center for Free-Electron Laser Science (CFEL). Additionally, two future experiments are planned at REGAE. First, an external injection experiment for Laser Wakefield Acceleration (LWA) will be performed in the framework of the LAOLA collaboration (LAboratory fOr Laser- and beam-driven plasma Acceleration). This experiment will provide a method for the reconstruction of the electric field distribution within a linear plasma wakefield. Second, a time resolving high energy Transmission Electron Microscope (TEM) will be implemented. Among others it is designed to allow for living cell imaging. Both experiments require strong focusing magnets inside the new target chamber at REGAE. Permanent magnetic solenoids (PMSs) can provide the needed focusing strength due to their enormous surface current density, while having compact dimensions at the same time. The present thesis deals with the design of such strong focusing PMSs. Since short and strong solenoids, as required for REGAE, exhibit a distinct non-linearity, the induced emittance growth is relatively large. This emittance growth is investigated and minimized for different set-ups with axially and radially magnetized annular magnets. Furthermore a magnetic shielding is developed. Together with a mechanical lifting system it assures that magnetic leakage fields do not disturb experiments, where the PMSs are removed from the beamline.

  15. First detector installed inside the ALICE solenoid...

    CERN Multimedia

    2006-01-01

    ALICE's emblematic red magnet welcomed its first detector on 23 September, when the array of seven Cherenkov detectors, named HMPID, was successfully installed. ALICE team members standing in front of the completed HMPID detector.The red magnet, viewed from its front opening. The HMPID unit, seen from the back (top right corner of photo) is placed on a frame and lifted onto a platform during the installation. After the installation of the ACORDE scintillator array and the muon trigger and tracking chambers, the ALICE collaboration fitted the first detector inside the solenoid. The HMPID, for High Momentum Particle Identification, was installed at the 2 o'clock position in the central and most external region of the space frame, just below the solenoid yoke. It will be used to extend the hadron identification capability of the ALICE experiment up to 5 GeV/c, thus complementing the reach of the other particle identification systems (ITS, TPC and TOF). The HMPID is a Ring Imaging Cherenkov (RICH) detector in a...

  16. Report of the large solenoid detector group

    International Nuclear Information System (INIS)

    Hanson, G.G.; Mori, S.; Pondrom, L.G.

    1987-09-01

    This report presents a conceptual design of a large solenoid for studying physics at the SSC. The parameters and nature of the detector have been chosen based on present estimates of what is required to allow the study of heavy quarks, supersymmetry, heavy Higgs particles, WW scattering at large invariant masses, new W and Z bosons, and very large momentum transfer parton-parton scattering. Simply stated, the goal is to obtain optimum detection and identification of electrons, muons, neutrinos, jets, W's and Z's over a large rapidity region. The primary region of interest extends over +-3 units of rapidity, although the calorimetry must extend to +-5.5 units if optimal missing energy resolution is to be obtained. A magnetic field was incorporated because of the importance of identifying the signs of the charges for both electrons and muons and because of the added possibility of identifying tau leptons and secondary vertices. In addition, the existence of a magnetic field may prove useful for studying new physics processes about which we currently have no knowledge. Since hermeticity of the calorimetry is extremely important, the entire central and endcap calorimeters were located inside the solenoid. This does not at the moment seem to produce significant problems (although many issues remain to be resolved) and in fact leads to a very effective muon detector in the central region

  17. Design of permanent magnetic solenoids for REGAE

    International Nuclear Information System (INIS)

    Gehrke, Tim

    2013-10-01

    The Relativistic Electron Gun for Atomic Exploration (REGAE) is a small linear accelerator at DESY in Hamburg, which produces short, low emittance electron bunches. It is originally designed and built for ultrafast electron diffraction (UED) within the framework of the Center for Free-Electron Laser Science (CFEL). Additionally, two future experiments are planned at REGAE. First, an external injection experiment for Laser Wakefield Acceleration (LWA) will be performed in the framework of the LAOLA collaboration (LAboratory fOr Laser- and beam-driven plasma Acceleration). This experiment will provide a method for the reconstruction of the electric field distribution within a linear plasma wakefield. Second, a time resolving high energy Transmission Electron Microscope (TEM) will be implemented. Among others it is designed to allow for living cell imaging. Both experiments require strong focusing magnets inside the new target chamber at REGAE. Permanent magnetic solenoids (PMSs) can provide the needed focusing strength due to their enormous surface current density, while having compact dimensions at the same time. The present thesis deals with the design of such strong focusing PMSs. Since short and strong solenoids, as required for REGAE, exhibit a distinct non-linearity, the induced emittance growth is relatively large. This emittance growth is investigated and minimized for different set-ups with axially and radially magnetized annular magnets. Furthermore a magnetic shielding is developed. Together with a mechanical lifting system it assures that magnetic leakage fields do not disturb experiments, where the PMSs are removed from the beamline.

  18. Capital Subsidies and the Underground Economy

    DEFF Research Database (Denmark)

    Busato, Francesco; Chiarini, Bruno; Angelis, Pasquale de

    In this paper we investigate the effects of different fiscal policies on the firm choice to produce underground. We consider a tax evading firm operating simultaneously both in the regular and in the underground economy. We suggest that such a kind of firm, referred to as moonlighting firm, is ab...

  19. Low-energy nuclear reactions with double-solenoid- based ...

    Indian Academy of Sciences (India)

    solenoids to produce low-energy radioactive nuclear beams. In these systems the solenoids act as thick lenses to collect, select, and focus the secondary beam into a scattering cham- ber. Many experiments with radioactive light particle beams (RNB) such as 6He, 7Be,. 8Li, 8B have been performed at these two facilities.

  20. Plasma confinement apparatus using solenoidal and mirror coils

    International Nuclear Information System (INIS)

    Fowler, T.K.; Condit, W.C.

    1979-01-01

    A plasma confinement apparatus is described, wherein multiple magnetic mirror cells are linked by magnetic field lines inside of a solenoid with the mirroring regions for adjacent magnetic mirror cells each formed by a separate mirror coil inside of the solenoid. The magnetic mirror cells may be field reversed

  1. TRT Trigger Performance in the Solenoidal Magnetic Field

    CERN Document Server

    Sivoklokov, S Yu

    1999-01-01

    The effect of the solenoidal magnetic field for the existing Level 2 Trigger TRT tracking algorithms has been studied in comparison with the ideal solenoid homogeneous field. The contribution of drift-time measurements to the quality of the reconstruction in the TRT is investigated.

  2. Underground super highway

    International Nuclear Information System (INIS)

    Latimer, Cole

    2010-01-01

    Clear communication is key. And quality communications and information equipment is now, more than ever before, integral in mine development as the industry moves towards greater remote control and automation of machinery and mining processes. In an underground mine, access to communications and information equipment has often been limited due to thermal extremes, physical hazards and dangerous chemicals. On top of this, copper conductors that are often used for communication equipment do not operate as efficiently because of the excessive noise generated by mining equipment, and may also puse a safety hazard. However, the design of extremely rugged fibre optic cables is now enabling ten gigabit transmission links in places that were never before thought possible in mining. One place though, has still proved a challenge for the expansion of fibre optic net-works, and that is in an underground coal mine. Until now. Optical Cable Corporation (OCC) has developed the rugged tight buffered breakout fibre optic cables for transmission links in harsh mining environments. Working at depths of over 300 metres below ground, and having seen roof falls actually bury the cable between rocks and still, the cables are able to operate in a myriad of conditions

  3. The Design Parameters for the MICE Tracker Solenoid

    International Nuclear Information System (INIS)

    Green, Michael A.; Chen, C.Y.; Juang, Tiki; Lau, Wing W.; Taylor, Clyde; Virostek, Steve P.; Wahrer, Robert; Wang, S.T.; Witte, Holger; Yang, Stephanie Q.

    2006-01-01

    The first superconducting magnets to be installed in the muon ionization cooling experiment (MICE) will be the tracker solenoids. The tracker solenoid module is a five coil superconducting solenoid with a 400 mm diameter warm bore that is used to provide a 4 T magnetic field for the experiment tracker module. Three of the coils are used to produce a uniform field (up to 4 T with better than 1 percent uniformity) in a region that is 300 mm in diameter and 1000 mm long. The other two coils are used to match the muon beam into the MICE cooling channel. Two 2.94-meter long superconducting tracker solenoid modules have been ordered for MICE. The tracker solenoid will be cooled using two-coolers that produce 1.5 W each at 4.2 K. The magnet system is described. The decisions that drive the magnet design will be discussed in this report

  4. Evaluation of advanced hydraulic turbomachinery for underground pumped hydroelectric storage. Part 1. Single-stage regulated pump turbines for operating heads of 500 to 1000 m

    Energy Technology Data Exchange (ETDEWEB)

    Frigo, A.A.; Blomquist, C.A.; Degnan, J.R.

    1979-10-01

    High-head, large-capacity turbomachinery is needed for the concept of underground pumped hydroelectric storage to be technically and economically attractive. Single-stage, reversible, Francis-type pump turbines with adjustable wicket gates appear to offer the most economically attractive option for heads between about 500 and 1000 m. The feasibility of developing these types of machines for capacities up to 500 MW and operating heads up to 1000 m has been evaluated. Preliminary designs have been generated for six single-stage pump turbines. The designs are for capacities of 350 and 500 MW and for operating heads of 500, 750, and 1000 m. The report contains drawings of the machines along with material specifications and hydraulic performance data. Mechanical, hydraulic, and economic analyses indicate that these machines will behave according to the criteria used to design them and that they can be built at a reasonable cost. The stress and deflection responses of the 500-MW, 100-m-head pump turbine, determined by detailed finite element analysis techniques, give solid evidence of the integrity of the conceptual designs of the six units and indicate no unsolvable problems. Results of a life expectancy analysis of the wicket gates indicate that a near infinite life can be expected for these components when they are subjected to normal design loads. Efficiencies of 90.7 and 91.4% in the generating and pumping modes, respectively, can be expected for the 500-MW, 1000-m-head unit. Performances of the other five machines are comparable. The specific costs of the pump turbines in mid-1978 US dollars per kW vary from 19.2 to 11.8 over a head range of from 500 to 1000 m for the 500-MW machines and from 20.0 to 12.3 for the 350-MW machines.

  5. Underground Layout Configuration

    International Nuclear Information System (INIS)

    A. Linden

    2003-01-01

    The purpose of this analysis was to develop an underground layout to support the license application (LA) design effort. In addition, the analysis will be used as the technical basis for the underground layout general arrangement drawings

  6. Underground disposal of radioactive wastes

    International Nuclear Information System (INIS)

    1981-01-01

    This report is an overview document for the series of IAEA reports dealing with underground waste disposal to be prepared in the next few years. It provides an introduction to the general considerations involved in implementing underground disposal of radioactive wastes. It suggests factors to be taken into account for developing and assessing waste disposal concepts, including the conditioned waste form, the geological containment and possible additional engineered barriers. These guidelines are general so as to cover a broad range of conditions. They are generally applicable to all types of underground disposal, but the emphasis is on disposal in deep geological formations. Some information presented here may require slight modifications when applied to shallow ground disposal or other types of underground disposal. Modifications may also be needed to reflect local conditions. In some specific cases it may be that not all the considerations dealt with in this book are necessary; on the other hand, while most major considerations are believed to be included, they are not meant to be all-inclusive. The book primarily concerns only underground disposal of the wastes from nuclear fuel cycle operations and those which arise from the use of isotopes for medical and research activities

  7. Underground pipeline corrosion

    CERN Document Server

    Orazem, Mark

    2014-01-01

    Underground pipelines transporting liquid petroleum products and natural gas are critical components of civil infrastructure, making corrosion prevention an essential part of asset-protection strategy. Underground Pipeline Corrosion provides a basic understanding of the problems associated with corrosion detection and mitigation, and of the state of the art in corrosion prevention. The topics covered in part one include: basic principles for corrosion in underground pipelines, AC-induced corrosion of underground pipelines, significance of corrosion in onshore oil and gas pipelines, n

  8. Superconducting Solenoid for Superfast THz Spectroscopy

    Science.gov (United States)

    Bragin, A. V.; Khrushchev, S. V.; Kubarev, V. V.; Mezencev, N. A.; Tsukanov, V. M.; Sozinov, G. I.; Shkaruba, V. A.

    This project is related to new spectroscopy method in little-developed THz range. The method is founded on using of a free electron laser (NovoFEL) with high spectral power radiation which can be smoothly tuned in desirable range of spectrum. The objects of research of this method are fast processes in physics, chemical and biological reactions. Uniform magnetic field of 6 T value in the research area can considerably increase possibilities of this method. The magnetic field will modulate radiation of free molecules induction on characteristic frequencies of the Zeeman splitting that gives more possibilities of identification of molecules having even weak magnetic momentum. Moreover, the use of magnetic field allows essentially increase sensitivity of this method due to almost complete separation of weak measuring signals from powerful radiation of the laser. A superconducting solenoid was developed for this method. Its design and peculiarities are described in this paper.

  9. Underground laboratories in Europe

    International Nuclear Information System (INIS)

    Coccia, E

    2006-01-01

    The only clear evidence today for physics beyond the standard model comes from underground experiments and the future activity of underground laboratories appears challenging and rich. I review here the existing underground research facilities in Europe. I present briefly the main characteristics, scientific activity and perspectives of these Laboratories and discuss the present coordination actions in the framework of the European Union

  10. View through the CMS detector during the cooldown of the solenoid on February 2006

    CERN Multimedia

    Richard Breedon, UC Davis

    2006-01-01

    Image looking along the beam direction through CMS. One can see, from the inside out: the patch panels and cables for the Preshower and ECAL; the front of the endcap HCAL; some cathode strip chambers (CSCs) for detecting muons; the sealed solenoid (the first circular silver-coloured ring) currently being cooled to operating temperature and held by the central barrel yoke ring (red and orange); one of the other barrel yoke rings installed with many muon chambers (silver rectangular boxes).

  11. A superconducting solenoid and press for permanent magnet fabrication

    International Nuclear Information System (INIS)

    Mulcahy, T. M.; Hull, J. R.

    2002-01-01

    For the first time, a superconducting solenoid (SCM) was used to increase the remnant magnetization of sintered NdFeB permanent magnets (PMs). In particular, improved magnetic alignment of commercial-grade PM powder was achieved, as it was axial die pressed into 12.7-mm diameter cylindrical compacts in the 76.2-mm warm bore of a 9-T SCM. The press used to compact the powder is unique and was specifically designed for use with the SCM. Although the press was operated in the batch mode for this proof of concept study, its design is intended to enable automated production. In operation, a simple die and punch set made of nonmagnetic materials was filled with powder and loaded into a nonmagnetic press tube. The cantilevered press tube was inserted horizontally, on a carrier manually advanced along a track, into the SCM. The robustness of the mechanical components and the SCM, in its liquid helium dewar, were specifically designed to allow for insertion and extraction of the magnetic powder and compacts, while operating at 9 T. Compaction was achieved by pressing the punches between the closed end of the press tube and the hydraulic cylinder mounted on the opposite end. Improvements up to 10% in magnetization and 20% in energy products of the permanent magnets were obtained, as the alignment fields were increased above the 2-T maximum field of the electromagnets used in industry. Increases in magnetization of 3% are significant in the mature sintered magnet industry

  12. Underground laboratory in China

    Science.gov (United States)

    Chen, Heshengc

    2012-09-01

    The underground laboratories and underground experiments of particle physics in China are reviewed. The Jinping underground laboratory in the Jinping mountain of Sichuan, China is the deepest underground laboratory with horizontal access in the world. The rock overburden in the laboratory is more than 2400 m. The measured cosmic-ray flux and radioactivities of the local rock samples are very low. The high-purity germanium experiments are taking data for the direct dark-matter search. The liquid-xenon experiment is under construction. The proposal of the China National Deep Underground Laboratory with large volume at Jinping for multiple discipline research is discussed.

  13. Validation of Quench Simulation and Simulation of the TWIN Solenoid

    CERN Document Server

    Pots, Rosalinde Hendrika

    2015-01-01

    For the Future Circular Collider at CERN a multi-purpose detector is proposed. The 6T TWIN Solenoid, a very large magnet system with a stored energy of 53 GJ, is being designed. It is important to protect the magnet against quenches in the system. Therefore several existing quench protection systems are evaluated and simulations have be performed on quenches in the TWIN Solenoid. The simulations on quenches in the TWIN Solenoid have been performed with promising results; the hotspot temperatures do not exceed 120 K and layer to layer voltages stay below 500 V. Adding quench heaters to the system might improve the quench protection system further.

  14. High Temperature Superconducting Underground Cable

    International Nuclear Information System (INIS)

    Farrell, Roger A.

    2010-01-01

    The purpose of this Project was to design, build, install and demonstrate the technical feasibility of an underground high temperature superconducting (HTS) power cable installed between two utility substations. In the first phase two HTS cables, 320 m and 30 m in length, were constructed using 1st generation BSCCO wire. The two 34.5 kV, 800 Arms, 48 MVA sections were connected together using a superconducting joint in an underground vault. In the second phase the 30 m BSCCO cable was replaced by one constructed with 2nd generation YBCO wire. 2nd generation wire is needed for commercialization because of inherent cost and performance benefits. Primary objectives of the Project were to build and operate an HTS cable system which demonstrates significant progress towards commercial progress and addresses real world utility concerns such as installation, maintenance, reliability and compatibility with the existing grid. Four key technical areas addressed were the HTS cable and terminations (where the cable connects to the grid), cryogenic refrigeration system, underground cable-to-cable joint (needed for replacement of cable sections) and cost-effective 2nd generation HTS wire. This was the worlds first installation and operation of an HTS cable underground, between two utility substations as well as the first to demonstrate a cable-to-cable joint, remote monitoring system and 2nd generation HTS.

  15. High Temperature Superconducting Underground Cable

    Energy Technology Data Exchange (ETDEWEB)

    Farrell, Roger, A.

    2010-02-28

    The purpose of this Project was to design, build, install and demonstrate the technical feasibility of an underground high temperature superconducting (HTS) power cable installed between two utility substations. In the first phase two HTS cables, 320 m and 30 m in length, were constructed using 1st generation BSCCO wire. The two 34.5 kV, 800 Arms, 48 MVA sections were connected together using a superconducting joint in an underground vault. In the second phase the 30 m BSCCO cable was replaced by one constructed with 2nd generation YBCO wire. 2nd generation wire is needed for commercialization because of inherent cost and performance benefits. Primary objectives of the Project were to build and operate an HTS cable system which demonstrates significant progress towards commercial progress and addresses real world utility concerns such as installation, maintenance, reliability and compatibility with the existing grid. Four key technical areas addressed were the HTS cable and terminations (where the cable connects to the grid), cryogenic refrigeration system, underground cable-to-cable joint (needed for replacement of cable sections) and cost-effective 2nd generation HTS wire. This was the world’s first installation and operation of an HTS cable underground, between two utility substations as well as the first to demonstrate a cable-to-cable joint, remote monitoring system and 2nd generation HTS.

  16. Design of a Solenoid Actuator for a Cylinder Valve in a Fuel Cell Vehicle

    Directory of Open Access Journals (Sweden)

    Hyo Ryeol Lee

    2016-10-01

    Full Text Available Green vehicles include electric vehicles, natural gas vehicles, fuel cell vehicles (FCV, and vehicles running on fuel such as a biodiesel or an ethanol blend. An FCV is equipped with a cylinder valve installed in an ultra-high pressure vessel to control the hydrogen flow. For this purpose, an optimum design of the solenoid actuator is necessary to ensure reliability when driving an FCV. In this study, an electromagnetic field analysis for ensuring reliable operation of the solenoid actuator was conducted by using Maxwell V15. The electromagnetic field analysis was performed by magneto static technique, according to the distance between magnetic poles, in order to predict the attraction force. Finally, the attraction force was validated through comparison between the Maxwell results and measurement results. From the results, the error of attraction force ranged from 2.33 to 3.85 N at testing conditions.

  17. Adjustment of Adiabatic Transition Magnetic Field of Solenoid-Induced Helicla Wiggler

    CERN Document Server

    Tsunawaki, Y

    2005-01-01

    We have been constructed a solenoid-induced helical wiggler for a compact free electron maser operated in a usual small laboratory which does not have electric source capacity available enough. It consists of two staggered-iron arrays inserted perpendicularly to each other in a solenoid electromagnet. In order to lead/extract an electron beam into/from the wiggler, adiabatic transition (AT) field is necessary at both ends of the wiggler. In this work the AT field was produced by setting staggered-nickel plates with different thickness in the five periods. The thickness of each nickel plate was decided by the field analysis using the MAGTZ computational code based on a magnetic moment method. Exact thickness was, however, found by the precise measurement of the field distribution with the greatest circumspection to obtain a homogeneous increment of the AT field. The change of AT field distribution was studied by referring to an equivalent electric circuit of the wiggler.

  18. The Cold Mass Support System and the Helium Cooling System for the MICE Focusing Solenoid

    International Nuclear Information System (INIS)

    Yang, Stephanie Q.; Green, Michael A.; Lau, Wing W.; Senanayake, Rohan S.; Witte, Holger

    2006-01-01

    The heart of the absorber focus coil (AFC) module for the muon ionization cooling experiment (MICE) is the two-coil superconducting solenoid that surrounds the muon absorber. The superconducting magnet focuses the muons that are cooled using ionization cooling, in order to improve the efficiency of cooling. The coils of the magnet may either be run in the solenoid mode (both coils operate at the same polarity) or the gradient (the coils operate at opposite polarity). The AFC magnet cold mass support system is designed to carry a longitudinal force up to 700 kN. The AFC module will be cooled using three pulse tube coolers that produce 1.5 W of cooling at 4.2 K. One of the coolers will be used to cool the liquid (hydrogen or helium) absorber used for ionization cooling. The other two coolers will cool the superconducting solenoid. This report will describe the MICE AFC magnet. The cold mass supports will be discussed. The reasons for using a pulsed tube cooler to cool this superconducting magnet will also be discussed

  19. Design and R and D for the central solenoid for the Compact Ignition Tokamak (CIT)

    International Nuclear Information System (INIS)

    Thome, R.J.; Pillsbury, R.D. Jr.; Smith, B.A.; Vieira, R.; Thomas, P.; Olmstead, M.; Mann, W.R.; Winn, P.; Titus, P.; Myatt, L.

    1989-01-01

    The CR will require a liquid-nitrogen-cooled, pulsed poloidal field coil system for plasma heating, shaping and control. The central solenoid will have a bore diameter of 0.8 m., a height of 4.8 m., and a central field of 23-25 T. Geometric restrictions are such that an aggressive structural concept is required. Two options are being considered for the machine. The first would require a central solenoid which is self supporting and which would consist of a stack of explosively bonded copper/Alloy 718 plates with a copper/Alloy 718 ratio of 50/50. Each plate is cut into eight turns by a water jet cutting process. This paper presents features of this design and selected results from an R and D program which is under way. Full-scale plates have been fabricated and cut, and prototypical mechanical and electrical joints have been tested. The other machine design option would allow the central solenoid to receive partial support from the TF coil system. In this case the operating scenario and stresses are substantially different. R and D tasks have been started to evaluate conductor lifetime under simulated operating conditions for alumina dispersion strengthened (ADS) copper. Explosively bonded copper/Alloy 718 plates remain an option, but with a substantial increase in the ratio of copper to Alloy 718 to 70/30. A status of test results and plans for these materials is given. 8 refs., 7 figs., 1 tab

  20. Solenoid hammer valve developed for quick-opening requirements

    Science.gov (United States)

    Wrench, E. H.

    1967-01-01

    Quick-opening lightweight solenoid hammer valve requires a low amount of electrical energy to open, and closes by the restoring action of the mechanical springs. This design should be applicable to many quick-opening requirements in fluid systems.

  1. The electromagnetic calorimeter for the solenoidal tracker at RHIC

    International Nuclear Information System (INIS)

    Beddo, M.E.; Bielick, E.; Dawson, J.W.

    1993-01-01

    This report discusses the following on the electromagnetic calorimeter for the solenoidal tracker at RHIC: conceptual design; the physics of electromagnetic calorimetry in STAR; trigger capability; integration into STAR; and cost, schedule, manpower, and funding

  2. A solenoidal and monocusp ion source (SAMIS) (abstract)ab

    International Nuclear Information System (INIS)

    Burns, E.J.; Brainard, J.P.; Draper, C.H.; Ney, R.H.; Leung, K.N.; Perkins, L.T.; Williams, M.D.; Wilde, S.B.

    1996-01-01

    We have developed a new magnetic monocusp ion source for single aperture applications such as neutron generators. Coupling solenoidal magnetic fields on both sides of a monocusp magnetic field has generated over 70% atomic deuterium ions at pressures as low as 0.4 Pa (3 mTorr). This article describes the performance and characteristics of the solenoidal and monocusp ion source. copyright 1996 American Institute of Physics

  3. The solenoidal detector collaboration silicon detector system

    International Nuclear Information System (INIS)

    Ziock, H.J.; Gamble, M.T.; Miller, W.O.; Palounek, A.P.T.; Thompson, T.C.

    1992-01-01

    Silicon tracking systems (STS) will be fundamental components of the tracking systems for both planned major SSC experiments. The STS is physically a small part of the central tracking system and the calorimeter of the detector being proposed by the Solenoidal Detector Collaboration (SDC). Despite its seemingly small size, it occupies a volume of more than 5 meters in length and 1 meter in diameter and is an order of magnitude larger than any silicon detector system previously built. The STS will consist of silicon microstrip detectors and possibly silicon pixel detectors. The other two components are an outer barrel tracker, which will consist of straw tubes or scintillating fibers; and an outer intermediate angle tracker, which will consist of gas microstrips. The components are designed to work as an integrated system. Each componenet has specific strengths, but is individually incapable of providing the overall performance required by the physics goals of the SSC. The large particle fluxes, the short times between beam crossing, the high channel count, and the required very high position measurement accuracy pose challenging problems that must be solved. Furthermore, to avoid degrading the measurements, the solutions must be achieved using only a minimal amount of material. An additional constraint is that only low-Z materials are allowed. If that were not difficlut enough, the solutions must also be affordable

  4. Review of technical features in underground laboratories

    Science.gov (United States)

    Ianni, Aldo

    2017-10-01

    Deep underground laboratories are multidisciplinary research infrastructures. The main feature of these laboratories is the reduced cosmic ray muons flux. This characteristic allows searching for rare events such as proton decay, dark matter particles or neutrino interactions. However, biology in extreme environments and geophysics are also studied underground. A number of ancillary facilities are critical to properly operate low background experiments in these laboratories. In this work we review the main characteristics of deep underground laboratories and discuss a few of the low background facilities.

  5. Underground laboratories in Asia

    Science.gov (United States)

    Lin, Shin Ted; Yue, Qian

    2015-08-01

    Deep underground laboratories in Asia have been making huge progress recently because underground sites provide unique opportunities to explore the rare-event phenomena for the study of dark matter searches, neutrino physics and nuclear astrophysics as well as the multi-disciplinary researches based on the low radioactive environments. The status and perspectives of Kamioda underground observatories in Japan, the existing Y2L and the planned CUP in Korea, India-based Neutrino Observatory (INO) in India and China JinPing Underground Laboratory (CJPL) in China will be surveyed.

  6. Underground Storage Tank (working)

    Data.gov (United States)

    Vermont Center for Geographic Information — Database contains information on ownership and system construction for underground storage tank facilities statewide. Database was developed in early 1990's for...

  7. Underground laboratories in Asia

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Shin Ted, E-mail: linst@mails.phys.sinica.edu.tw [College of Physical Science and Technology, Sichuan University, Chengdu 610064 China (China); Yue, Qian, E-mail: yueq@mail.tsinghua.edu.cn [Key Laboratory of Particle and Radiation Imaging (Ministry of Education) and Department of Engineering Physics, Tsinghua University, Beijing 100084 China (China)

    2015-08-17

    Deep underground laboratories in Asia have been making huge progress recently because underground sites provide unique opportunities to explore the rare-event phenomena for the study of dark matter searches, neutrino physics and nuclear astrophysics as well as the multi-disciplinary researches based on the low radioactive environments. The status and perspectives of Kamioda underground observatories in Japan, the existing Y2L and the planned CUP in Korea, India-based Neutrino Observatory (INO) in India and China JinPing Underground Laboratory (CJPL) in China will be surveyed.

  8. Underground laboratories in Asia

    International Nuclear Information System (INIS)

    Lin, Shin Ted; Yue, Qian

    2015-01-01

    Deep underground laboratories in Asia have been making huge progress recently because underground sites provide unique opportunities to explore the rare-event phenomena for the study of dark matter searches, neutrino physics and nuclear astrophysics as well as the multi-disciplinary researches based on the low radioactive environments. The status and perspectives of Kamioda underground observatories in Japan, the existing Y2L and the planned CUP in Korea, India-based Neutrino Observatory (INO) in India and China JinPing Underground Laboratory (CJPL) in China will be surveyed

  9. Underground ventilation remote monitoring and control system

    International Nuclear Information System (INIS)

    Strever, M.T.; Wallace, K.G. Jr.; McDaniel, K.H.

    1995-01-01

    This paper presents the design and installation of an underground ventilation remote monitoring and control system at the Waste Isolation Pilot Plant. This facility is designed to demonstrate safe underground disposal of U.S. defense generated transuranic nuclear waste. To improve the operability of the ventilation system, an underground remote monitoring and control system was designed and installed. The system consists of 15 air velocity sensors and 8 differential pressure sensors strategically located throughout the underground facility providing real-time data regarding the status of the ventilation system. In addition, a control system was installed on the main underground air regulators. The regulator control system gives indication of the regulator position and can be controlled either locally or remotely. The sensor output is displayed locally and at a central surface location through the site-wide Central Monitoring System (CMS). The CMS operator can review all sensor data and can remotely operate the main underground regulators. Furthermore, the Virtual Address Extension (VAX) network allows the ventilation engineer to retrieve real-time ventilation data on his personal computer located in his workstation. This paper describes the types of sensors selected, the installation of the instrumentation, and the initial operation of the remote monitoring system

  10. Conceptual design report for the Solenoidal Tracker at RHIC

    International Nuclear Information System (INIS)

    1992-01-01

    The Solenoidal Tracker At RHIC (STAR) will search for signatures of quark-gluon plasma (QGP) formation and investigate the behavior of strongly interacting matter at high energy density. The emphasis win be the correlation of many observables on an event-by-event basis. In the absence of definitive signatures for the QGP, it is imperative that such correlations be used to identify special events and possible signatures. This requires a flexible detection system that can simultaneously measure many experimental observables. The physics goals dictate the design of star and it's experiment. To meet the design criteria, tracking, momentum analysis, and particle identification of most of the charged particles at midrapidity are necessary. The tracking must operate in conditions at higher than the expected maximum charged particle multiplicities for central Au + Au collisions. Particle identification of pions/kaons for p < 0.7 GeV/c and kaons/protons for p < 1 GeV/c, as well as measurement of decay particles and reconstruction of secondary vertices will be possible. A two-track resolution of 2 cm at 2 m radial distance from, the interaction is expected. Momentum resolution of Δp/p ∼ 0.02 at p = 0.1 GeV/c is required to accomplish the physics, and,Δp/p of several percent at p = 10 GeV/c is sufficient to accurately measure the rapidly failing spectra at high Pt and particles from mini-jets and jets

  11. Conceptual design report for the Solenoidal Tracker at RHIC

    Energy Technology Data Exchange (ETDEWEB)

    The STAR Collaboration

    1992-06-15

    The Solenoidal Tracker At RHIC (STAR) will search for signatures of quark-gluon plasma (QGP) formation and investigate the behavior of strongly interacting matter at high energy density. The emphasis win be the correlation of many observables on an event-by-event basis. In the absence of definitive signatures for the QGP, it is imperative that such correlations be used to identify special events and possible signatures. This requires a flexible detection system that can simultaneously measure many experimental observables. The physics goals dictate the design of star and it`s experiment. To meet the design criteria, tracking, momentum analysis, and particle identification of most of the charged particles at midrapidity are necessary. The tracking must operate in conditions at higher than the expected maximum charged particle multiplicities for central Au + Au collisions. Particle identification of pions/kaons for p < 0.7 GeV/c and kaons/protons for p < 1 GeV/c, as well as measurement of decay particles and reconstruction of secondary vertices will be possible. A two-track resolution of 2 cm at 2 m radial distance from, the interaction is expected. Momentum resolution of {Delta}p/p {approximately} 0.02 at p = 0.1 GeV/c is required to accomplish the physics, and,{Delta}p/p of several percent at p = 10 GeV/c is sufficient to accurately measure the rapidly failing spectra at high Pt and particles from mini-jets and jets.

  12. NdFeB Magnets Aligned in a 9-T Superconducting Solenoid (asterisk)

    Science.gov (United States)

    Mulcahy, T. M.; Hull, J. R.

    2002-08-01

    Commercial-grade magnet powder (Magnequench UG) was uniaxial die-pressed into cylindrical compacts, while being aligned in the 1-T to 8-T DC field of a superconducting solenoid at Argonne National Laboratory. Then, the compacts were added to normal Magnequench UG production batches for sintering and annealing. The variations in magnet properties for different strengths of alignment fields are reported for 15.88-mm (5/8-in.) diameter compacts made with length-to-diameter (L/D) ratios in the range 3 0.25 and L 1. The best magnets were produced when the powder-filled die was inserted into the active field of the solenoid and then pressed. Improvements in the residual flux density of 8% and in the energy product of 16% were achieved by increasing the alignment field beyond the typical 2-T capabilities of electromagnets. The most improvement was achieved for the compacts with the smallest L/D ratio. The ability to make very strong magnets with small L/D, where self-demagnetization effects during alignment are greatest, would benefit most the production of near-final-shape magnets. Compaction of the magnet powder using a horizontal die and a continuously active superconducting solenoid was not a problem. Although the press was operated in the batch mode for this proof-of-concept study, its design is intended to enable automated production.

  13. Large high current density superconducting solenoids for use in high energy physics experiments

    International Nuclear Information System (INIS)

    Green, M.A.; Eberhard, P.H.; Taylor, J.D.

    1976-05-01

    Very often the study of high energy physics in colliding beam storage-rings requires a large magnetic field volume in order to detect and analyze charged particles which are created from the collision of two particle beams. Large superconducting solenoids which are greater than 1 meter in diameter are required for this kind of physics. In many cases, interesting physics can be done outside the magnet coil, and this often requires that the amount of material in the magnet coil be minimized. As a result, these solenoids should have high current density (up to 10 9 A m -2 ) superconducting windings. The methods commonly used to stabilize large superconducting magnets cannot be employed because of this need to minimize the amount of material in the coils. A description is given of the Lawrence Berkeley Laboratory program for building and testing prototype solenoid magnets which are designed to operate at coil current densities in excess of 10 9 A m -2 with magnetic stored energies which are as high as 1.5 Megajoules per meter of solenoid length. The coils use intrinsically stable multifilament Nb--Ti superconductors. Control of the magnetic field quench is achieved by using a low resistance aluminum bore tube which is inductively coupled to the coil. The inner cryostat is replaced by a tubular cooling system which carries two phase liquid helium. The magnet coil, the cooling tubes, and aluminum bore tube are cast in epoxy to form a single unified magnet and cryogenic system which is about 2 centimeters thick. The results of the magnet coil tests are discussed

  14. The LASS [Larger Aperture Superconducting Solenoid] spectrometer

    International Nuclear Information System (INIS)

    Aston, D.; Awaji, N.; Barnett, B.

    1986-04-01

    LASS is the acronym for the Large Aperture Superconducting Solenoid spectrometer which is located in an rf-separated hadron beam at the Stanford Linear Accelerator Center. This spectrometer was constructed in order to perform high statistics studies of multiparticle final states produced in hadron reactions. Such reactions are frequently characterized by events having complicated topologies and/or relatively high particle multiplicity. Their detailed study requires a spectrometer which can provide good resolution in momentum and position over almost the entire solid angle subtended by the production point. In addition, good final state particle identification must be available so that separation of the many kinematically-overlapping final states can be achieved. Precise analyses of the individual reaction channels require high statistics, so that the spectrometer must be capable of high data-taking rates in order that such samples can be acquired in a reasonable running time. Finally, the spectrometer must be complemented by a sophisticated off-line analysis package which efficiently finds tracks, recognizes and fits event topologies and correctly associates the available particle identification information. This, together with complicated programs which perform specific analysis tasks such as partial wave analysis, requires a great deal of software effort allied to a very large computing capacity. This paper describes the construction and performance of the LASS spectrometer, which is an attempt to realize the features just discussed. The configuration of the spectrometer corresponds to the data-taking on K + and K - interactions in hydrogen at 11 GeV/c which took place in 1981 and 1982. This constitutes a major upgrade of the configuration used to acquire lower statistics data on 11 GeV/c K - p interactions during 1977 and 1978, which is also described briefly

  15. The LASS (Larger Aperture Superconducting Solenoid) spectrometer

    Energy Technology Data Exchange (ETDEWEB)

    Aston, D.; Awaji, N.; Barnett, B.; Bienz, T.; Bierce, R.; Bird, F.; Bird, L.; Blockus, D.; Carnegie, R.K.; Chien, C.Y.

    1986-04-01

    LASS is the acronym for the Large Aperture Superconducting Solenoid spectrometer which is located in an rf-separated hadron beam at the Stanford Linear Accelerator Center. This spectrometer was constructed in order to perform high statistics studies of multiparticle final states produced in hadron reactions. Such reactions are frequently characterized by events having complicated topologies and/or relatively high particle multiplicity. Their detailed study requires a spectrometer which can provide good resolution in momentum and position over almost the entire solid angle subtended by the production point. In addition, good final state particle identification must be available so that separation of the many kinematically-overlapping final states can be achieved. Precise analyses of the individual reaction channels require high statistics, so that the spectrometer must be capable of high data-taking rates in order that such samples can be acquired in a reasonable running time. Finally, the spectrometer must be complemented by a sophisticated off-line analysis package which efficiently finds tracks, recognizes and fits event topologies and correctly associates the available particle identification information. This, together with complicated programs which perform specific analysis tasks such as partial wave analysis, requires a great deal of software effort allied to a very large computing capacity. This paper describes the construction and performance of the LASS spectrometer, which is an attempt to realize the features just discussed. The configuration of the spectrometer corresponds to the data-taking on K and K interactions in hydrogen at 11 GeV/c which took place in 1981 and 1982. This constitutes a major upgrade of the configuration used to acquire lower statistics data on 11 GeV/c K p interactions during 1977 and 1978, which is also described briefly.

  16. Silicon subsystem mechanical engineering work for the solenoidal detector collaboration

    International Nuclear Information System (INIS)

    Miller, W.O.; Barney, M.; Byrd, D.; Christensen, R.W.; Dransfield, G.; Elder, M.; Gamble, M.; Crastataro, C.; Hanlon, J.; Jones, D.C.

    1995-01-01

    The silicon tracking system (STS) for the Solenoidal Detector Collaboration (SDC) represented an order of magnitude increase in size over any silicon system that had been previously built or even planned. In order to meet its performance requirements, it could not simply be a linear scaling of earlier systems, but instead required completely new concepts. The small size of the early systems made it possible to simply move the support hardware and services largely outside the active volume of the system. For a system five meters long, that simply is not an option. The design of the STS for the SDC experiment was the result of numerous compromises between the capabilities required to do the physics and the limitations imposed by cost, material properties, and silicon strip detector characteristics. From the point of view of the physics, the silicon system should start as close to the interaction point as possible. In addition, the detectors should measure the position of particles passing through them with no errors, and should not deflect or interact with the particles in any way. However, cost, radiation damage, and other factors limiting detector performance dictated, other, more realistic values. Radiation damage limited the inner radius of the silicon detectors to about 9 cm, whereas cost limited the outer radius of the detectors to about 50 cm. Cost also limits the half length of the system to about 250 cm. To control the effects of radiation damage on the detectors required operating the system at a temperature of 0 degrees C or below, and maintaining that temperature throughout life of the system. To summarize, the physics and properties of the silicon strip detectors requires that the detectors be operated at or below 0 degrees C, be positioned very accurately during assembly and remain positionally stable throughout their operation, and that all materials used be radiation hard and have a large thickness for one radiation length

  17. Assessment of condition of underground collector lines situated inside the technological complexes of underground storage facilities

    Directory of Open Access Journals (Sweden)

    Anton Misany

    2006-10-01

    Full Text Available The evaluation of status of underground gas pipeline systems operating for several decades becomes a decisive factor of the decision making for their further safe and reliable operation. The decision becomes crucial especially in cases when piping is installed within a facility without the cathodic protection. The evaluation and inspection of underground gas manifolds requires a specific approach tailored for the respective manifolds.In 2003 NAFTA, the company initiated an extensive plan of the underground gas manifolds diagnostics and evaluation. The results were presented within the Working Committee WOC2 at the 23rd World Gas Congress in Amsterdam.

  18. Evaluation and Compensation of Detector Solenoid Effects in the JLEIC

    Energy Technology Data Exchange (ETDEWEB)

    Wei, Guohui [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Morozov, Vasiliy [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Zhang, Yuhong [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Pilat, Fulvia C. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)

    2016-05-01

    The JLEIC detector solenoid has a strong 3 T field in the IR area, and its tails extend over a range of several meters. One of the main effects of the solenoid field is coupling of the horizontal and vertical betatron motions which must be corrected in order to preserve the dynamical stability and beam spot size match at the IP. Additional effects include influence on the orbit and dispersion caused by the angle between the solenoid axis and the beam orbit. Meanwhile it affects ion polarization breaking the figure-8 spin symmetry. Crab dynamics further complicates the picture. All of these effects have to be compensated or accounted for. The proposed correction system is equivalent to the Rotating Frame Method. However, it does not involve physical rotation of elements. It provides local compensation of the solenoid effects independently for each side of the IR. It includes skew quadrupoles, dipole correctors and anti-solenoids to cancel perturbations to the orbit and linear optics. The skew quadrupoles and FFQ together generate an effect equivalent to adjustable rotation angle to do the decoupling task. Details of all of the correction systems are presented.

  19. Underground storage tanks

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Environmental contamination from leaking underground storage tanks poses a significant threat to human health and the environment. An estimated five to six million underground storage tanks containing hazardous substances or petroleum products are in use in the US. Originally placed underground as a fire prevention measure, these tanks have substantially reduced the damages from stored flammable liquids. However, an estimated 400,000 underground tanks are thought to be leaking now, and many more will begin to leak in the near future. Products released from these leaking tanks can threaten groundwater supplies, damage sewer lines and buried cables, poison crops, and lead to fires and explosions. As required by the Hazardous and Solid Waste Amendments (HSWA), the EPA has been developing a comprehensive regulatory program for underground storage tanks. The EPA proposed three sets of regulations pertaining to underground tanks. The first addressed technical requirements for petroleum and hazardous substance tanks, including new tank performance standards, release detection, release reporting and investigation, corrective action, and tank closure. The second proposed regulation addresses financial responsibility requirements for underground petroleum tanks. The third addressed standards for approval of state tank programs

  20. Laser solenoid: an alternate use of lasers in fusion power

    International Nuclear Information System (INIS)

    Rose, P.H.

    1977-01-01

    A unique laser assisted fusion approach is under development at Mathematical Sciences Northwest, Inc. (MSNW). This approach captures one of the most developed aspects of high energy laser technology, the efficient, large, scalable, pulsed electron beam initiated, electric discharge, CO 2 infrared laser. This advanced technology is then combined with the simple geometry of a linear magnetic confinement system. The laser solenoid concept will be described, current work and experimental progress will be discussed, and the technological problems of building such a system will be assessed. Finally a comparison will be made of the technology and economics for the laser solenoid and alternative fusion approaches

  1. The Compact Muon Solenoid Heavy Ion program

    International Nuclear Information System (INIS)

    Yepes, Pablo

    2005-01-01

    The Pb-Pb center of mass energy at the LHC will exceed that of Au-Au collisions at RHIC (Relativistic Heavy Ion Collider) by nearly a factor of 30, providing exciting opportunities for addressing unique physics issues in a completely new energy domain. The interest of the Heavy Ion (HI) Physics at LHC is discussed in more detail in the LHC-USA white paper and the Compact Muon Solenoid (CMS) Heavy Ion proposal. A few highlights are presented in this document. Heavy ion collisions at LHC energies will explore regions of energy and particle density significantly beyond those reachable at RHIC. The energy density of the thermalized matter created at the LHC is estimated to be 20 times higher than at RHIC, implying an initial temperature, which is greater than at RHIC by more than a factor of two. The higher density of produced partons also allows a faster thermalization. As a consequence, the ratio of the quark-gluon plasma lifetime to the thermalization time increases by a factor of 10 over RHIC. Thus the hot, dense systems created in HI collisions at the LHC spend most of the time in a purely partonic state. The longer lifetime of the quark-gluon plasma state widens significantly the time window available to probe it experimentally. RHIC experiments have reported evidence for jet production in HI collisions and for suppression of high p T particle production. Those results open a new field of exploration of hot and dense nuclear matter. Even though RHIC has already broken ground, the production rates for jets with p T > 30 GeV are several orders of magnitude larger at the LHC than at RHIC, allowing for systematic studies with high statistics in a clean kinematic region. High p T quark and gluon jets can be used to study the hot hadronic medium produced in HI interactions. The larger Q 2 causes jets to materialize very soon after the collision. They are thus embedded in and propagate through the dense environment as it forms and evolves. Through their interactions

  2. The underground macroeconomics

    Directory of Open Access Journals (Sweden)

    Marin Dinu

    2013-01-01

    Full Text Available Like Physics, which cannot yet explain 96% of the substance in the Universe, so is Economics, unprepared to understand and to offer a rational explicative model to the underground economy.

  3. Conceptual design report for the Solenoidal Tracker at RHIC

    Energy Technology Data Exchange (ETDEWEB)

    1992-06-15

    The Solenoidal Tracker At RHIC (STAR) will search for signatures of quark-gluon plasma (QGP) formation and investigate the behavior of strongly interacting matter at high energy density. The emphasis win be the correlation of many observables on an event-by-event basis. In the absence of definitive signatures for the QGP, it is imperative that such correlations be used to identify special events and possible signatures. This requires a flexible detection system that can simultaneously measure many experimental observables. The physics goals dictate the design of star and it's experiment. To meet the design criteria, tracking, momentum analysis, and particle identification of most of the charged particles at midrapidity are necessary. The tracking must operate in conditions at higher than the expected maximum charged particle multiplicities for central Au + Au collisions. Particle identification of pions/kaons for p < 0.7 GeV/c and kaons/protons for p < 1 GeV/c, as well as measurement of decay particles and reconstruction of secondary vertices will be possible. A two-track resolution of 2 cm at 2 m radial distance from, the interaction is expected. Momentum resolution of {Delta}p/p {approximately} 0.02 at p = 0.1 GeV/c is required to accomplish the physics, and,{Delta}p/p of several percent at p = 10 GeV/c is sufficient to accurately measure the rapidly failing spectra at high Pt and particles from mini-jets and jets.

  4. Orpheus in the Underground

    Directory of Open Access Journals (Sweden)

    Puskás Dániel

    2015-12-01

    Full Text Available In my study I deal with descents to the underworld and hell in literature in the 20th century and in contemporary literature. I will focus on modem literary reinterpretations of the myth of Orpheus, starting with Rilke’s Orpheus. Eurydice. Hermes. In Seamus Heaney’s The Underground. in the Hungarian Istvan Baka’s Descending to the Underground of Moscow and in Czesław Miłosz’s Orpheus and Eurydice underworld appears as underground, similarly to the contemporary Hungarian János Térey’s play entitled Jeramiah. where underground will also be a metaphorical underworld which is populated with the ghosts of the famous deceased people of Debrecen, and finally, in Péter Kárpáti’s Everywoman the grave of the final scene of the medieval Everyman will be replaced with a contemporary underground station. I analyse how an underground station could be parallel with the underworld and I deal with the role of musicality and sounds in the literary works based on the myth of Orpheus.

  5. Environmental issues during excavation of underground developed galleries by opencast method operating under the constraint of fire - suggestions with case study

    International Nuclear Information System (INIS)

    Singh, R.V.K.; Ghosh, S.K.

    1996-01-01

    There are several factors responsible for polluting the environment of which mine files is one. Fire in mines also causes direct loss of equipment, damage to surface structure and loss of a country's precious coal reserves. In addition, it affects normal production, releases noxious gases, heat, smoke and dust and poses a serious health hazard. At present many underground mines are being converted into opencast to augment production. But several fires in such mines are causing pollution and becoming a hindrance to production. In this paper the case Ghugus opencast project in Wardha coalfield is discussed. This paper assesses the environmental impacts of fires in opencast workings of developed pillars and suggests measures for controlling and combating the intensity of the existing fires with a view to extract coal within a reasonable period of time so as to minimize environmental problems. 4 refs

  6. Insulating process for HT-7U central solenoid model coils

    International Nuclear Information System (INIS)

    Cui Yimin; Pan Wanjiang; Wu Songtao; Wan Yuanxi

    2003-01-01

    The HT-7U superconducting Tokamak is a whole superconducting magnetically confined fusion device. The insulating system of its central solenoid coils is critical to its properties. In this paper the forming of the insulating system and the vacuum-pressure-impregnating (VPI) are introduced, and the whole insulating process is verified under the super-conducting experiment condition

  7. Structure design of the central solenoid in JT-60SA

    International Nuclear Information System (INIS)

    Asakawa, Shuji; Tsuchiya, Katsuhiko; Kuramochi, Masaya; Yoshida, Kiyoshi

    2009-09-01

    The upgrade of JT-60U magnet system to superconducting coils (JT-60SA: JT-60 Super Advanced) has been decided by parties of Japanese government (JA) and European commission (EU) in the framework of the Broader Approach (BA) agreement. The magnet system for JT-60SA consists of a central solenoid (CS), equilibrium field(EF) coils, toroidal field(TF) coils. The central solenoid consists the four winding pack modules. In order to counteract the thermal contraction as well as the electric magnetic repulsion and attraction together with other forces generated in each module, it is necessary to apply pre-loading to the support structure of the solenoid and to pursue a structure which is capable of sustaining such loading. In the present report, the structural design of the supporting structure of the solenoid and the jackets of the modules is verified analytically, and the results indicate that the structural design satisfies the 'Codes for Fusion Facilities - Rules on Superconducting Magnet Structure -'. (author)

  8. Three dimensional multilayer solenoid microcoils inside silica glass

    Science.gov (United States)

    Meng, Xiangwei; Yang, Qing; Chen, Feng; Shan, Chao; Liu, Keyin; Li, Yanyang; Bian, Hao; Si, Jinhai; Hou, Xun

    2016-01-01

    Three dimensional (3D) solenoid microcoils could generate uniform magnetic field. Multilayer solenoid microcoils are highly pursued for strong magnetic field and high inductance in advanced magnetic microsystems. However, the fabrication of the 3D multilayer solenoid microcoils is still a challenging task. In this paper, 3D multilayer solenoid microcoils with uniform diameters and high aspect ratio were fabricated in silica glass. An alloy (Bi/In/Sn/Pb) with high melting point was chosen as the conductive metal to overcome the limitation of working temperature and improve the electrical property. The inductance of the three layers microcoils was measured, and the value is 77.71 nH at 100 kHz and 17.39 nH at 120 MHz. The quality factor was calculated, and it has a value of 5.02 at 120 MHz. This approach shows an improvement method to achieve complex 3D metal microstructures and electronic components, which could be widely integrated in advanced magnetic microsystems.

  9. Low-energy nuclear reactions with double-solenoid-based ...

    Indian Academy of Sciences (India)

    The University of Notre Dame, USA (Becchetti et al, Nucl. Instrum. Methods Res. A505, 377 (2003)) and later the University of São Paulo, Brazil (Lichtenthaler et al, Eur. Phys. J. A25, S-01, 733 (2005)) adopted a system based on superconducting solenoids to produce low-energy radioactive nuclear beams. In these systems ...

  10. Teichmüller theory of the punctured solenoid

    DEFF Research Database (Denmark)

    Penner, Robert; Sari´c, Dragomir

    2008-01-01

    The punctured solenoid plays the role of an initial object for the category of punctured surfaces with morphisms given by finite covers branched only over the punctures. The (decorated) Teichmüller space of is introduced, studied, and found to be parametrized by certain coordinates on a fixed tri...

  11. Modeling plasma flow in straight and curved solenoids

    International Nuclear Information System (INIS)

    Boercker, D.B.; Sanders, D.M.; Storer, J.; Falabella, S.

    1991-01-01

    The ''flux-tube'' model originated by Morozov is a very simple and numerically efficient method for simulating ion motion in plasma filters. In order to test its utility as a design tool, we compare the predictions of the model to recent experimental measurements of plasma flow in both straight and curved solenoids

  12. Completion of the ITER central solenoid model coils installation

    International Nuclear Information System (INIS)

    Tsuji, H.

    1999-01-01

    The short article details how dozens of problems, regarding the central solenoid model coils installation, were faced and successfully overcome one by one at JAERI-Naga. A black and white photograph shows K. Kwano, a staff member of the JAERI superconducting magnet laboratory, to be still inside the vacuum tank while the lid is already being brought down..

  13. Design, fabrication, and characterization of a solenoid system to ...

    Indian Academy of Sciences (India)

    resonance, mirror, and flat, satisfying electron cyclotron resonance condition along the axis of the plasma chamber. 2D Poisson software was used for designing. Details of design, fabrication, and magnetic field mapping of the solenoid coils are ...

  14. Design, fabrication, and characterization of a solenoid system to ...

    Indian Academy of Sciences (India)

    Design, fabrication, and characterization of a solenoid system to generate magnetic field for an ECR proton source. S K JAIN. ∗. , P A NAIK and P R HANNURKAR. Raja Ramanna Centre for Advanced Technology, Indore 452 013 e-mail: skjain@rrcat.gov.in. MS received 3 March 2010; revised 9 June 2010; accepted 13 ...

  15. Explicit representation of roots on p-adic solenoids and non ...

    Indian Academy of Sciences (India)

    measures on p-adic solenoids is solved under a certain natural condition. Keywords. Solenoid; root multiplicity; infinite divisibility; one-parameter subgroup; embedding problem; convolution semigroup; uniqueness of embedding. 1. Introduction. Given a prime number p let Sp denote the p-adic solenoid, i.e. the subgroup of ...

  16. Underground storage of nuclear waste

    International Nuclear Information System (INIS)

    Russell, J.E.

    1977-06-01

    The objective of the National Waste Terminal Storage (NWTS) Program is to provide facilities in various deep geologic formations at multiple locations in the United States which will safely dispose of commerical radioactive waste. The NWTS Program is being administered for the Energy Research and Development Administration (ERDA) by the Office of Waste Isolation (OWI), Union Carbide Corporation, Nuclear Division. OWI manages projects that will lead to the location, construction, and operation of repositories, including all surface and underground engineering and facility design projects and technical support projects. 7 refs., 5 figs

  17. The Compact Muon Solenoid Experiment at the Large Hadron Collider The Compact Muon Solenoid Experiment at the Large Hadron Collider

    Directory of Open Access Journals (Sweden)

    David Delepine

    2012-02-01

    Full Text Available The Compact Muon Solenoid experiment at the CERN Large Hadron Collider will study protonproton collisions at unprecedented energies and luminosities. In this article we providefi rst a brief general introduction to particle physics. We then explain what CERN is. Thenwe describe the Large Hadron Collider at CERN, the most powerful particle acceleratorever built. Finally we describe the Compact Muon Solenoid experiment, its physics goals,construction details, and current status.El experimento Compact Muon Solenoid en el Large Hadron Collider del CERN estudiarácolisiones protón protón a energías y luminosidades sin precedente. En este artículo presentamos primero una breve introducción general a la física de partículas. Despuésexplicamos lo que es el CERN. Luego describimos el Large Hadron Collider, el más potente acelerador de partículas construido por el hombre, en el CERN. Finalmente describimos el experimento Compact Muon Solenoid, sus objetivos en física, los detalles de su construcción,y su situación presente.

  18. Permanent Closure of the TAN-664 Underground Storage Tank

    Energy Technology Data Exchange (ETDEWEB)

    Bradley K. Griffith

    2011-12-01

    This closure package documents the site assessment and permanent closure of the TAN-664 gasoline underground storage tank in accordance with the regulatory requirements established in 40 CFR 280.71, 'Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.'

  19. 30 CFR 75.340 - Underground electrical installations.

    Science.gov (United States)

    2010-07-01

    ... Section 75.340 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Ventilation § 75.340 Underground...) Ventilated with intake air that is monitored for carbon monoxide or smoke by an AMS installed and operated...

  20. Mechanical performance evaluation of the CFETR central solenoid model coil design

    Science.gov (United States)

    Liu, Xiaogang; Wang, Zhaoliang; Ren, Yong; Li, Junjun; Yin, Dapeng; Li, Lei; Gao, Xiang; Wu, Yu

    2018-01-01

    The Chinese Fusion Engineering Test Reactor (CFETR) Central Solenoid Model Coil is being fabricated by the Institute of Plasma Physics Chinese Academy of Sciences. The Model Coil is comprised of Nb3Sn and NbTi modules held together by a preload structure. It will operate at 4.5 K to produce a peak field of 12 T at 48 kA. In order to investigate the feasibility and integrity of the Model Coil design before its manufacturing, the mechanical performance has been evaluated for the room temperature preload, 4.5 K stand-by and 48 kA operating conditions. A 1/15 3D detailed model that consists of jackets, insulations, bladders, buffers and preload structure, is constructed and simulated using the coupled structural-thermal-electromagnetic solver of ANSYS. In contrary to a smeared winding pack model, our analysis with the detailed model can directly and precisely simulate the differential thermal contraction effect of the preload structure, jacket and insulations, as well as the electromagnetic load acting on the jacket. The detailed deformation and stress behaviors of the Model Coil are illustrated and discussed. The results indicate that the final design of the CFETR Central Solenoid Model Coil is reasonably conservative and satisfy the design criteria.

  1. A conduction-cooled, 680-mm-long warm bore, 3-T Nb3Sn solenoid for a Cerenkov free electron laser

    OpenAIRE

    Wessel, Wilhelm A.J.; den Ouden, A.; Krooshoop, Hendrikus J.G.; ten Kate, Herman H.J.; Wieland, J.; van der Slot, Petrus J.M.

    1999-01-01

    A compact, cryocooler cooled Nb3Sn superconducting magnet system for a Cerenkov free electron laser has been designed, fabricated and tested. The magnet is positioned directly behind the electron gun of the laser system. The solenoidal field compresses and guides a tube-shaped 100 A, 500 kV electron beam. A two-stage GM cryocooler, equipped with a first generation ErNi5 regenerator, cools the epoxy impregnated solenoid down to the operating temperature of about 7.5 K. This leaves a conservati...

  2. Results from a model system of superconducting solenoids and phase shifting bridge for pulsed power studies for proposed tokamak EF coils

    International Nuclear Information System (INIS)

    Fuja, R.E.; Kustom, R.L.; Smith, R.P.

    1977-01-01

    A matched pair of superconducting solenoids and a phase-shifting bridge circuit has been constructed to study energy storage and transfer for application to tokamak EF coils. The intrinsically stable solenoids, each with 4 H self-inductance, incorporate sufficient cooling to allow charging at several hundred volts, corresponding to B approximately equal 1 T/sec. The three-phase inductor-convertor capacitive bridge network operating at up to 150 V rms transfers energy reversibly and at controllable rates from the storage coil to the load coil

  3. IE Information Notice No. 85-17, Supplement 1: Possible sticking of ASCO solenoid valves

    International Nuclear Information System (INIS)

    Jordan, E.L.

    1992-01-01

    This notice is to inform recipients of the results of follow up investigations regarding the reasons for sticking of Automatic Switch Company (ASCO) solenoid valves used to shut main steam isolation valves (MSIVs) under accident conditions. GE has recommend that the licensee replace the potentially contaminated MSIV solenoid valves and institute a periodic examination and cleaning of the MSIV solenoid valves. Grand Gulf has replaced the eight MSIV HTX832320V dual solenoid valves with fully environmentally qualified ASCO Model NP 8323A20E dual solenoid valves. The environmentally qualified valve Model NP 8323A20E was included in a control sample placed in the test ovens with the solenoid valves that stuck at Grand Gulf. The environmentally qualified model did not stick under the test conditions that cause sticking in the other solenoid valves

  4. Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    Aines, R.; Newmark, R.; McConachie, W.; Udell, K.; Rice, D.; Ramirez, A.; Siegel, W.; Buettner, M.; Daily, W.; Krauter, P.; Folsom, E.; Boegel, A.J.; Bishop, D.; Udell, K.

    1992-01-01

    LLNL is collaborating with the UC Berkeley College of Engineering to develop and demonstrate a system of thermal remediation and underground imaging techniques for use in rapid cleanup of localized underground spills. Called ''Dynamic Stripping'' to reflect the rapid and controllable nature of the process, it will combine steam injection, direct electrical heating, and tomographic geophysical imaging in a cleanup of the LLNL gasoline spill. In the first 8 months of the project, a Clean Site engineering test was conducted to prove the field application of the techniques before moving the contaminated site in FY 92

  5. The Solenoidal Detector Collaboration silicon detector system

    International Nuclear Information System (INIS)

    Ziock, H.J.; Gamble, M.T.; Miller, W.O.; Palounek, A.P.T.; Thompson, T.C.

    1992-01-01

    Silicon tracking systems will be fundamental components of the tracking systems for both planned major SSC experiments. Despite its seemingly small size, it occupies a volume of more than 5 meters in length and 1 meter in diameter and is an order of magnitude larger than any silicon detector system previously built. This report discusses its design and operation

  6. Underground storage tank management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  7. Underground storage tank management plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations

  8. Underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    Pinto, S.; Telleschi, P.

    1978-10-01

    Two of the main underground siting alternatives, the rock cavity plant and the pit siting, have been investigated in detail and two layouts, developed for specific sites, have been proposed. The influence of this type of siting on normal operating conditions and during abnormal occurences have been investigated. (Auth.)

  9. submitter Physical Properties of a High-Strength Austenitic Stainless Steel for the Precompression Structure of the ITER Central Solenoid

    CERN Document Server

    Sgobba, Stefano; Arauzo, Ana; Roussel, Pascal; Libeyre, Paul

    2016-01-01

    The ITER central solenoid (CS) consists of six independent coils kept together by a precompression support structure that must react vertical tensile loads and provide sufficient preload to maintain coil-to-coil contact when the solenoid is energized. The CS precompression system includes tie plates, lower and upper key blocks, load distribution and isolation plates and other attachment, support and insulating hardware. The tie plates operating at 4 K are manufactured starting from forgings in a high-strength austenitic stainless steel (FXM-19) with a stringent specification. Moreover, forged components for the lower and upper key blocks have to be provided in the same FXM-19 grade with comparably strict requirements. FXM-19 is a high-nitrogen austenitic stainless steel, featuring high strength and toughness, ready weldability, and forgeability. It features as well higher integral thermal contraction down to 4 K compared with the very high Mn steel grade selected for the CS coil jackets, hence providing an ad...

  10. Thermal analysis of the cold mass of the 2T solenoid for the PANDA detector at FAIR

    CERN Document Server

    Rolando, G; Dudarev, A; Pais Da Silva, H; Vodopyanov, A; Schmitt, L

    2015-01-01

    The superconducting solenoid of the PANDA experiment at the Facility for Antiproton and Ion Research (FAIR) in Darmstadt (Germany) is designed to provide a magnetic field of 2 T over a length of about 4 m in a bore of 1.9 m. To allow a warm target feed pipe oriented transversely to the solenoid axis and penetrating through the cryostat and solenoid cold mass, the magnet is split into 3 inter-connected coils fitted in a common support cylinder. During normal operation, cooling of the cold mass to the working temperature of 4.5 K will be achieved through the circulation by natural convection of two-phase helium in cooling pipes attached to the Al-alloy support cylinder. Pure aluminium strips acting as heat drains and glued to the inner surface of the three coils and thermally bonded to the cooling pipes allow minimizing the temperature gradient across the 6-layers coils. In this paper the thermal design of the cold mass during normal operation and current ramps up and down is validated using an analytical appro...

  11. Blast biology: a study of the primary and tertiary effects of blast in open underground protective shelters. Project 33. 1 of Operation Plumbbob

    Energy Technology Data Exchange (ETDEWEB)

    Ricmond, D.R.; Taborelli, R.V.; Bowen, I.G.

    1959-02-01

    Dogs, pigs, rabbits, guinea pigs, and mice were exposed to nuclear detonations in two open underground partitioned shelters. The shelters were of similar construction, and each was exposed to separate detonations. Each inner chamber filled through its own orifice; thus four separate pressure environments were obtained. An aerodynamic mound was placed over the escape hatch of each structure to determine its effect on the pressure-curve shape inside the chamber. In one test a sieve plate bolted across the top of the mound was evaluated. Wind protective baffles of solid plate and of heavy wire screen were installed in the shelters to compare primary and tertiary blast effects on dogs. The shelters also contained static and dynamic pressure gages, radiation detectors, telemetering devices, and, in one test, air-temperature measuring instruments, dust-collecting trays, and eight pigs for the biological assessment of thermal effects. One dog was severely injured from tertiary blast effects associated with a maximal dynamic pressure (Q) of 10.5 psi, and one was undamaged with a maximal Q of 2 psi. Primary blast effects resulting from peak overpressures of 30.3, 25.5, 9.5, and 4.1 psi were minimal. The mortality was 19% of the mice exposed to a peak pressure of 30.3 psi and 5 and 3% of the guinea pigs and mice exposed to a peak pressure of 25.5 psi. Many of the rabbits, guinea pigs, and mice sustained slight lung hemorrhages at maximum pressues of 25.5 and 30.3 psi. Eardrum perforation data for all species, except mice, were recorded. Following shot 2, thermal effects were noted. Animals of the groups saved for observation have died from ionizing-radiation effects.

  12. Effect of solenoidal magnetic field on drifting laser plasma

    Science.gov (United States)

    Takahashi, Kazumasa; Okamura, Masahiro; Sekine, Megumi; Cushing, Eric; Jandovitz, Peter

    2013-04-01

    An ion source for accelerators requires to provide a stable waveform with a certain pulse length appropriate to the application. The pulse length of laser ion source is easy to control because it is expected to be proportional to plasma drifting distance. However, current density decay is proportional to the cube of the drifting distance, so large current loss will occur under unconfined drift. We investigated the stability and current decay of a Nd:YAG laser generated copper plasma confined by a solenoidal field using a Faraday cup to measure the current waveform. It was found that the plasma was unstable at certain magnetic field strengths, so a baffle was introduced to limit the plasma diameter at injection and improve the stability. Magnetic field, solenoid length, and plasma diameter were varied in order to find the conditions that minimize current decay and maximize stability.

  13. H- beam neutralization measurements in a solenoidal beam transport system

    International Nuclear Information System (INIS)

    Sherman, J.; Pitcher, E.; Stevens, R.; Allison, P.

    1992-01-01

    H minus beam space-charge neutralization is measured for 65-mA, 35-keV beams extracted from a circular-aperture Penning surface-plasma source, the small-angle source. The H minus beam is transported to a RFQ matchpoint by a two-solenoid magnet system. Beam noise is typically ±4%. A four-grid analyzer is located in a magnetic-field-free region between the two solenoid magnets. H minus potentials are deduced from kinetic energy measurements of particles (electrons and positive ions) ejected radially from the beam channel by using a griddled energy analyzer. Background neutral gas density is increased by the introduction of additional Xe and Ar gases, enabling the H minus beam to become overneutralized

  14. Conceptual design of the CMS 4 Tesla solenoid

    International Nuclear Information System (INIS)

    Baze, J.M.; Desportes, H.; Duthil, R.; Lesmond, C.; Lottin, J.C.; Pabot, Y.

    1992-02-01

    A large and important meeting 'Toward the LHC experimental programme' is due to be held at EVIAN-les-BAINS, on 5-8 March 1992. The major goal accurate measurement of muon momenta makes necessary, for the detectors, the use of large and powerful magnetic system producing high bending power. The CMS experiment is based on a solenoidal magnetic configuration. It has been designed to produce a high magnetic induction (4 T) in a 14 m long, 5.9 m bore cylindrical volume surrounding the interaction point. The diameter has been fixed to the maximum dimension compatible with road transportation to CERN. This long solenoid with its 12 500 ton iron yoke is a fully shielded magnet. The paper presents the conceptual design of the superconducting coil and its technical characteristics

  15. Transverse emittance measurement at REGAE via a solenoid scan

    Energy Technology Data Exchange (ETDEWEB)

    Hachmann, Max

    2012-12-15

    The linear accelerator REGAE at DESY produces short and low charged electron bunches, on the one hand to resolve the excitation transitions of atoms temporally by pump probe electron diffraction experiments and on the other hand to investigate principal mechanisms of laser plasma acceleration. For both cases a high quality electron beam is required. A quantity to rate the beam quality is the beam emittance. In the course of this thesis transverse emittance measurements by a solenoid scan could be realized and beyond that an improved theoretical description of a solenoid was successful. The foundation of emittance measurements are constituted by theoretical models which describe the envelope of a beam. Two different models were derived. The first is an often used model to determine the transverse beam emittance without considering space charge effects. More interesting and challenging was the development of an envelope model taking space charge effects into account. It is introduced and cross checked with measurements and simulations.

  16. Underground Storage Tanks in Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Underground storage tank (UST) sites which store petroleum in Iowa. Includes sites which have been reported to DNR, and have active or removed underground storage...

  17. Subsidence Induced by Underground Extraction

    Science.gov (United States)

    Galloway, Devin L.

    2016-01-01

    Subsidence induced by underground extraction is a class of human-induced (anthropogenic) land subsidence that principally is caused by the withdrawal of subsurface fluids (groundwater, oil, and gas) or by the underground mining of coal and other minerals.

  18. Underground Coal Mining

    Science.gov (United States)

    Hill, G. M.

    1980-01-01

    Computer program models coal-mining production, equipment failure and equipment repair. Underground mine is represented as collection of work stations requiring service by production and repair crews alternately. Model projects equipment availability and productivity, and indicates proper balance of labor and equipment. Program is in FORTRAN IV for batch execution; it has been implemented on UNIVAC 1108.

  19. Underground nuclear astrophysics at the Dresden Felsenkeller

    Energy Technology Data Exchange (ETDEWEB)

    Bemmerer, Daniel; Ilgner, Christoph; Junghans, Arnd R.; Mueller, Stefan; Rimarzig, Bernd; Schwengner, Ronald; Szuecs, Tamas; Wagner, Andreas [Helmholtz-Zentrum Dresden-Rossendorf (HZDR), Dresden (Germany); Cowan, Thomas E.; Gohl, Stefan; Grieger, Marcel; Reinicke, Stefan; Roeder, Marko; Schmidt, Konrad; Stoeckel, Klaus; Takacs, Marcell P.; Wagner, Louis [Helmholtz-Zentrum Dresden-Rossendorf (HZDR), Dresden (Germany); Technische Universitaet Dresden (Germany); Reinhardt, Tobias P.; Zuber, Kai [Technische Universitaet Dresden (Germany)

    2015-07-01

    Favored by the low background underground, accelerator-based experiments are an important tool to study nuclear astrophysics reactions involving stable charged particles. This technique has been used with great success at the 0.4 MV LUNA accelerator in the Gran Sasso laboratory in Italy. However, the nuclear reactions of helium and carbon burning and the neutron source reactions for the astrophysical s-process require higher beam energies, as well as the continuation of solar fusion studies. As a result, NuPECC strongly recommended the installation of one or more higher-energy underground accelerators. Such a project is underway in Dresden. A 5 MV Pelletron accelerator is currently being refurbished by installing an ion source on the high voltage terminal, enabling intensive helium beams. The preparation of the underground site is funded, and the civil engineering project is being updated. The science case, operational strategy and project status are reported.

  20. Electron Beam Size Measurements in a Cooling Solenoid

    CERN Document Server

    Kroc, Thomas K; Burov, Alexey; Seletsky, Sergey; Shemyakin, Alexander V

    2005-01-01

    The Fermilab Electron Cooling Project requires a straight trajectory and constant beam size to provide effective cooling of the antiprotons in the Recycler. A measurement system was developed using movable appertures and steering bumps to measure the beam size in a 20 m long, nearly continuous, solenoid. This paper discusses the required beam parameters, the implimentation of the measurement system and results for our application.

  1. Siberian Snake solenoid for the AGS

    International Nuclear Information System (INIS)

    Ratner, L. G.

    1991-01-01

    Recent experiments at the Indiana University Cyclotron Facility (IUCF) have demonstrated that ''Siberian Snakes'' can be used to preserve the polarization of an accelerated polarized beam in a circular accelerator. Retrofitting full snakes into accelerators such as the Alternating Gradient Synchrotron (AGS) at Brookhaven is almost impossible due to space limitations, but a partial snake that can correct depolarization due to imperfection resonances with 1/20 to 1/30 of a full strength snake seems to present a viable option. We describe such a device for the AGS and give the design criteria in terms of simplicity of accelerator operation and level of achievable polarization. 2 refs., 5 figs., 1 tab

  2. Field measurements in the Fermilab electron cooling solenoid prototype

    CERN Document Server

    Crawford, A C

    2003-01-01

    To increase the Tevatron luminosity, Fermilab is developing a high-energy electron cooling system [1] to cool 8.9-GeV/c antiprotons in the Recycler ring. The schematic layout of the Recycler Electron Cooling (REC) system is shown in Figure 1. Cooling of antiprotons requires a round electron beam with a small angular spread propagating through a cooling section with a kinetic energy of 4.3 MeV. To confine the electron beam tightly and to keep its transverse angles below 10 sup - sup 4 rad, the cooling section will be immersed into a solenoidal field of 50-150G. As part of the R and D effort, a cooling section prototype consisting of 9 modules (90% of the total length of a future section) was assembled and measured. This paper describes the technique of measuring and adjusting the magnetic field quality in the cooling section and presents preliminary results of solenoid prototype field measurements. The design of the cooling section solenoid is discussed in Chapter 2. Chapter 3 describes details of a dedicated ...

  3. D0 Silicon Upgrade: Pipe Sizing for Solenoid / VLPC Cryogenic Systems

    Energy Technology Data Exchange (ETDEWEB)

    Rucinski, Russ; Sakla, Steve; /Fermilab

    1995-02-20

    The addition of a solenoid magnet and VLPC detectors are two of a number of upgrades which will occur at the D-Zero detector in the near future. Both of these upgrades will require cryogenic services for their operation. The purpose of this engineering note is to document the pipe/tube size choices made for these cryogenic services. This was done by calculating the required flow rates to cool down the magnet and VLPC's over a reasonable length of time and to determine the required piping sizes for a given allowable pressure drop. The pressure drops for steady state conditions also are addressed. The cool down requirements drove the pipe size decision. The raw engineering calculations that were done for this project are included as an appendix to this note. The body of this document discusses the methods and results of the calculations. As a quick summary, Figures 1 and 2 show the size selections. Tables 1 and 2 give a more detailed size and description of each section of Solenoid and VLPC transfer line.

  4. Earthquake damage to underground facilities

    Energy Technology Data Exchange (ETDEWEB)

    Pratt, H.R.; Hustrulid, W.A. Stephenson, D.E.

    1978-11-01

    The potential seismic risk for an underground nuclear waste repository will be one of the considerations in evaluating its ultimate location. However, the risk to subsurface facilities cannot be judged by applying intensity ratings derived from the surface effects of an earthquake. A literature review and analysis were performed to document the damage and non-damage due to earthquakes to underground facilities. Damage from earthquakes to tunnels, s, and wells and damage (rock bursts) from mining operations were investigated. Damage from documented nuclear events was also included in the study where applicable. There are very few data on damage in the subsurface due to earthquakes. This fact itself attests to the lessened effect of earthquakes in the subsurface because mines exist in areas where strong earthquakes have done extensive surface damage. More damage is reported in shallow tunnels near the surface than in deep mines. In mines and tunnels, large displacements occur primarily along pre-existing faults and fractures or at the surface entrance to these facilities.Data indicate vertical structures such as wells and shafts are less susceptible to damage than surface facilities. More analysis is required before seismic criteria can be formulated for the siting of a nuclear waste repository.

  5. Earthquake damage to underground facilities

    International Nuclear Information System (INIS)

    Pratt, H.R.; Hustrulid, W.A.; Stephenson, D.E.

    1978-11-01

    The potential seismic risk for an underground nuclear waste repository will be one of the considerations in evaluating its ultimate location. However, the risk to subsurface facilities cannot be judged by applying intensity ratings derived from the surface effects of an earthquake. A literature review and analysis were performed to document the damage and non-damage due to earthquakes to underground facilities. Damage from earthquakes to tunnels, s, and wells and damage (rock bursts) from mining operations were investigated. Damage from documented nuclear events was also included in the study where applicable. There are very few data on damage in the subsurface due to earthquakes. This fact itself attests to the lessened effect of earthquakes in the subsurface because mines exist in areas where strong earthquakes have done extensive surface damage. More damage is reported in shallow tunnels near the surface than in deep mines. In mines and tunnels, large displacements occur primarily along pre-existing faults and fractures or at the surface entrance to these facilities.Data indicate vertical structures such as wells and shafts are less susceptible to damage than surface facilities. More analysis is required before seismic criteria can be formulated for the siting of a nuclear waste repository

  6. Nuclear plant undergrounding

    International Nuclear Information System (INIS)

    Brown, R.C.; Bastidas, C.P.

    1978-01-01

    Under Section 25524.3 of the Public Resources Code, the California Energy Resources Conservation and Development Commission (CERCDC) was directed to study ''the necessity for '' and the effectiveness and economic feasibility of undergrounding and berm containment of nuclear reactors. The author discusses the basis for the study, the Sargent and Lundy (S and L) involvement in the study, and the final conclusions reached by S and L

  7. Design of a Solenoid Actuator with a Magnetic Plunger for Miniaturized Segment Robots

    Directory of Open Access Journals (Sweden)

    Chang-Woo Song

    2015-09-01

    Full Text Available We develop a solenoid actuator with a ferromagnetic plunger to generate both rectilinear and turning motions of a multi-segmented robot. Each segment of the miniaturized robot is actuated by a pair of solenoids, and in-phase and out-of-phase actuations of the solenoid pair cause the linear and turning motions. The theoretical analysis on the actuation force by the solenoid with the magnetic plunger is implemented based on the Biot-Savart law. The optimal design parameters of the solenoid are determined to actuate a segmented body. We manufacture the miniaturized robot consisting of two segments and a pair of solenoids. Experiments are performed to measure the linear and angular displacements of the two-segmented robot for various frictional conditions.

  8. Underground siting of nuclear power plants: potential benefits and penalties

    International Nuclear Information System (INIS)

    Allensworth, J.A.; Finger, J.T.; Milloy, J.A.; Murfin, W.B.; Rodeman, R.; Vandevender, S.G.

    1977-08-01

    The potential for improving nuclear power safety is analyzed by siting plants underground in mined cavities or by covering plants with fill earth after construction in an excavated cut. Potential benefits and penalties of underground plants are referenced to analogous plants located on the surface. Three representative regional sites having requisite underground geology were used to evaluate underground siting. The major factors which were evaluated for all three sites were: (1) containment of radioactive materials, (2) transport of groundwater contamination, and (3) seismic vulnerability. External protection, plant security, feasibility, operational considerations, and cost were evaluated on a generic basis. Additionally, the national availability of sites having the requisite geology for both underground siting concepts was determined

  9. Monitoring underground movements

    CERN Multimedia

    Antonella Del Rosso

    2015-01-01

    On 16 September 2015 at 22:54:33 (UTC), an 8.3-magnitude earthquake struck off the coast of Chile. 11,650 km away, at CERN, a new-generation instrument – the Precision Laser Inclinometer (PLI) – recorded the extreme event. The PLI is being tested by a JINR/CERN/ATLAS team to measure the movements of underground structures and detectors.   The Precision Laser Inclinometer during assembly. The instrument has proven very accurate when taking measurements of the movements of underground structures at CERN.    The Precision Laser Inclinometer is an extremely sensitive device capable of monitoring ground angular oscillations in a frequency range of 0.001-1 Hz with a precision of 10-10 rad/Hz1/2. The instrument is currently installed in one of the old ISR transfer tunnels (TT1) built in 1970. However, its final destination could be the ATLAS cavern, where it would measure and monitor the fine movements of the underground structures, which can affect the precise posi...

  10. Generation of ten kilotesla longitudinal magnetic fields in ultraintense laser-solenoid target interactions

    OpenAIRE

    Xiao, K. D.; Zhou, C. T.; Zhang, H.; Huang, T. W.; Li, R.; Qiao, B.; Cao, J. M.; Cai, T. X.; Ruan, S. C.; He, X. T.

    2018-01-01

    Production of the huge longitudinal magnetic fields by using an ultraintense laser pulse irradiating a solenoid target is considered. Through three-dimensional particle-in-cell simulations, it is shown that the longitudinal magnetic field up to ten kilotesla can be observed in the ultraintense laser-solenoid target interactions. The finding is associated with both fast and return electron currents in the solenoid target. The huge longitudinal magnetic field is of interest for a number of impo...

  11. Design and fabrication of the PDX poloidal field solenoid utilizing fiberglass reinforced epoxy

    International Nuclear Information System (INIS)

    Young, K.S.C.

    1975-11-01

    This paper discusses the basic design of the Poloidal Field Solenoid Coil. It will be mainly concerned with the more unique features of the Solenoid such as the copper coil windings and the design of the epoxy-glass structural support mandrels. The center solenoid coil of the PDX machine consists of five different coil systems (OH No. 8, No. 9; NF No. 11; DF No. 7; EF Solenoid and CF No. 9). Three concentric fiberglass reinforced epoxy cylinders fabricated in-house will act as mandrels to support and to house the coils that will result as an integral unit

  12. Beam dynamics of the interaction region solenoid in a linear collider due to a crossing angle

    Directory of Open Access Journals (Sweden)

    P. Tenenbaum

    2003-06-01

    Full Text Available Future linear colliders may require a nonzero crossing angle between the two beams at the interaction point (IP. This requirement in turn implies that the beams will pass through the strong interaction region solenoid with an angle, and thus that the component of the solenoidal field perpendicular to the beam trajectory is nonzero. The interaction of the beam and the solenoidal field in the presence of a crossing angle will cause optical effects not observed for beams passing through the solenoid on axis; these effects include dispersion, deflection of the beam, and synchrotron radiation effects. For a purely solenoidal field, the optical effects which are relevant to luminosity exactly cancel at the IP when the influence of the solenoid’s fringe field is taken into account. Beam size growth due to synchrotron radiation in the solenoid is proportional to the fifth power of the product of the solenoidal field, the length of the solenoid, and the crossing angle. Examples based on proposed linear collider detector solenoid configurations are presented.

  13. What caused the failures of the solenoid valve screws

    International Nuclear Information System (INIS)

    Vassallo, T.P.; Mumford, J.R.; Hossain, F.

    2001-01-01

    At Seabrook Station on May 5,1998 following a lengthy purge of the pressurizer steam space through Containment isolation sample valve 1-RC-FV-2830, the UL status light associated with this solenoid valve did not come on when the valve was closed from the plant's main control board. The UL status light is used to confirm valve closure position to satisfy the plant's Technical Specification requirements. The incorrect valve position indication on the main control board was initially believed to have resulted from excessive heat from a failed voltage control module that did not reduce the voltage to the valve's solenoid coil. This conclusion was based on a similar event that occurred in November of 1996. Follow-up in-plant testing of the valve determined that the voltage control module had not failed and was functioning satisfactorily. Subsequent investigations determined the root cause of the event to be excessive heat-up of the valve caused by high process fluid temperature and an excessively long purge of the pressurizer. The excessive heat-up of the valve from the high temperature process fluid weakened the magnetic field strength of the valve stem magnet to the extent that the UL status light reed switch would not actuate when the valve was closed. Since the voltage control module was tested and found to be functioning properly it was not replaced. Only the UL status light reed switch was replaced with a more sensitive reed that would respond better to a reduced magnetic field strength that results from a hot magnet. During reed switch replacement, three terminal block screws in the valve housing were found fractured and three other terminal block screws fractured during determination of the electrical conductors. This paper describes the initial plant event and ensuing laboratory tests and examinations that were performed to determine the root cause of the failure of the terminal block screws from the Containment isolation sample solenoid valve. (author)

  14. Magnetoelectric excitations in hexaferrites utilizing solenoid coil for sensing applications

    Energy Technology Data Exchange (ETDEWEB)

    Zare, Saba; Izadkhah, Hessam; Somu, Sivasubramanian; Vittoria, Carmine, E-mail: c.vittoria@neu.edu

    2015-11-01

    We have developed techniques for H- and E-field sensors utilizing single phase magnetoelectric hexaferrite materials in the frequency range of 100 Hz to 10 MHz. Novel excitation method incorporating solenoid coils and single and multi-capacitor banks were developed and tested for sensor detections. For H-field sensing we obtained sensitivity of about 3000 V/mG and for E-field sensing the sensitivity was 10{sup −4} G/Vm{sup −1}. Tunability of about 0.1% was achieved for tunable inductor applications. However, the proposed designs lend themselves to significant (~10{sup 6}) improvements in sensitivity and tunability.

  15. Applications of a 6.5T Superconducting Solenoidal Separator

    Directory of Open Access Journals (Sweden)

    Williams E.

    2012-10-01

    Full Text Available A 6.5 Tesla superconducting gas-filled solenoid (SOLITAIRE has been developed at the Heavy Ion Accelerator Facility at the ANU as a reaction product separator. Key features of the device allowing its application for precise measurement of heavy ion fusion cross sections are described. The physical separation of beam particles and the high efficiency (~80% transport of heavy ion fusion products open up applications in nuclear structure physics, and in materials science. Finally, the developments to allow its application to providing beams of light radioactive isotopes (SOLEROO are described.

  16. Environment Of Underground Water And Pollution

    Energy Technology Data Exchange (ETDEWEB)

    Han, Jeong Sang

    1998-02-15

    This book deals with environment of underground water and pollution, which introduces the role of underground water in hydrology, definition of related study of under water, the history of hydro-geology, basic conception of underground water such as origin of water, and hydrogeologic characteristic of aquifers, movement of underground water, hydrography of underground water and aquifer test analysis, change of an underground water level, and water balance analysis and development of underground water.

  17. Investigation, development and verification of printed circuit board embedded air-core solenoid transformers

    DEFF Research Database (Denmark)

    Mønster, Jakob Døllner; Madsen, Mickey Pierre; Pedersen, Jeppe Arnsdorf

    2015-01-01

    A new printed circuit board embedded air-core transformer/coupled inductor is proposed and presented. The transformer is intended for use in power converter applications operating at very high frequency between 30 MHz to 300 MHz. The transformer is based on two or more solenoid structures...... in different configurations. The different configurations are compared for usefulness as a transformer solution, and an analytical model of the inductive parameters for the most suitable configuration is derived for design purpose. The analytical model is verified by comparing calculations and measurements...... of prototypes. The analytical model shows good agreement with the measured results. The model can predict the inductive parameters of the transformer with a deviation range of approximately 3 % to 22 %. Lastly a prototype is used in a VHF converter to achieve a rise of 2.2% points in efficiency....

  18. Improving Code Quality of the Compact Muon Solenoid Electromagnetic Calorimeter Control Software to Increase System Maintainability

    CERN Multimedia

    Holme, Oliver; Dissertori, Günther; Djambazov, Lubomir; Lustermann, Werner; Zelepoukine, Serguei

    2013-01-01

    The Detector Control System (DCS) software of the Electromagnetic Calorimeter (ECAL) of the Compact Muon Solenoid (CMS) experiment at CERN is designed primarily to enable safe and efficient operation of the detector during Large Hadron Collider (LHC) data-taking periods. Through a manual analysis of the code and the adoption of ConQAT [1], a software quality assessment toolkit, the CMS ECAL DCS team has made significant progress in reducing complexity and improving code quality, with observable results in terms of a reduction in the effort dedicated to software maintenance. This paper explains the methodology followed, including the motivation to adopt ConQAT, the specific details of how this toolkit was used and the outcomes that have been achieved. [1] ConQAT, Continuous Quality Assessment Toolkit; https://www.conqat.org/

  19. Structural analysis of a superconducting central solenoid for the Tokamak Physics Experiment

    International Nuclear Information System (INIS)

    O'Connor, T.G.; Heim, J.R.

    1993-01-01

    The Tokamak Physics Experiment (TPX) concept design uses superconducting coils to accomplish magnetic confinement. The central solenoid (CS) magnet is divided vertically into 8 equal segments which are powered independently. The eddy current heating from the pulsed operation is too high for a case type construction; therefore, a open-quotes no caseclose quotes design has been chosen. This open-quotes no caseclose quotes design uses the conductor conduit as the primary structure and the electrical insulation as a structural adhesive. This electrical insulation is the open-quotes weak linkclose quotes in the coil winding pack structure and needs to be modeled in detail. A global finite element model with smeared winding pack properties was used to study the CS magnet structural behavior. The structural analysis results and peak stresses will be presented

  20. The upgrade and re-validation of the Compact Muon Solenoid Electromagnetic Calorimeter Control System

    CERN Multimedia

    Holme, Oliver; Di Calafiori, Diogo; Dissertori, Günther; Djambazov, Lubomir; Jovanovic, Dragoslav; Lustermann, Werner; Zelepoukine, Serguei

    2013-01-01

    The Electromagnetic Calorimeter (ECAL) is one of the sub-detectors of the Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC) at CERN. The Detector Control System (DCS) that has been developed and implemented for the CMS ECAL was deployed in accordance with the LHC schedule and has been supporting the CMS data-taking since LHC physics runs started in 2009. During these years, the control system has been regularly adapted according to operational experience and new requirements, always respecting the constraints imposed on significant changes to a running system. Several hardware and software upgrades and system extensions were therefore deferred to the first LHC Long Shutdown (LS1). This paper presents the main architectural differences between the system that supported the CMS ECAL during its first years and the new design for the coming physics runs after LS1. Details on the upgrade planning, including the certification methods performed in the CMS ECAL DCS laboratory facilities, repor...

  1. Underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    Bender, F.

    1982-01-01

    The symposium gave the opportunity for an international exchange of views on the concepts of underground nuclear power plants, which are presently world wide under consideration. The results of investigations into the advantages and disadvantages with regard to the technical safety aspects of the underground plants in comparison to plants on the surface led to open and sometimes controversal discussions. As a result of the symposium (32 contributions) a general agreement can be stated on the judgement concerning the advantages and the disadvantages of underground nuclear power plants (nnp). The advantages are: increased protection against external events; delayed release of fission products in accident situations, if the closures operate properly. The disadvantages are: increased costs of the construction of underground and restrictions to such sites where either large caverns or deep pits can be constructed, which also requires that certain technical problems must be solved beforehand. Also, additional safety certificates related to the site will be required within the licensing procedures. The importance of these advantages and disadvantages was in some cases assessed very differently. The discussions also showed, that there are a number of topics where some questions have not been finally answered yet. (orig./HP) [de

  2. Underground water stress release models

    Science.gov (United States)

    Li, Yong; Dang, Shenjun; Lü, Shaochuan

    2011-08-01

    The accumulation of tectonic stress may cause earthquakes at some epochs. However, in most cases, it leads to crustal deformations. Underground water level is a sensitive indication of the crustal deformations. We incorporate the information of the underground water level into the stress release models (SRM), and obtain the underground water stress release model (USRM). We apply USRM to the earthquakes occurred at Tangshan region. The analysis shows that the underground water stress release model outperforms both Poisson model and stress release model. Monte Carlo simulation shows that the simulated seismicity by USRM is very close to the real seismicity.

  3. Laser heated solenoid as a neutron source facility

    International Nuclear Information System (INIS)

    Steinhauer, L.C.; Rose, P.H.

    1975-01-01

    Conceptual designs are presented for a radiation test facility based on a laser heated plasma confined in a straight solenoid. The thin plasma column, a few meters in length and less than a centimeter in diameter, serves as a line source of neutrons. Test samples are located within or just behind the plasma tube, at a radius of 1-2 cm from the axis. The plasma is heated by an axially-directed powerful long-wavelength laser beam. The plasma is confined radially in the intense magnetic field supplied by a pulsed solenoid surrounding the plasma tube. The facility is pulsed many times a second to achieve a high time-averaged neutron flux on the test samples. Based on component performance achievable in the near term (e.g., magnetic field, laser pulse energy) and assuming classical physical processes, it appears that average fluxes of 10 13 to 10 14 neutrons/cm 2 -sec can be achieved in such a device. The most severe technical problems in such a facility appear to be rapid pulsing design and lifetime of some electrical and laser components

  4. The superconducting strand for the CMS solenoid conductor

    CERN Document Server

    Curé, B; Campi, D; Goodrich, L F; Horváth, I L; Kircher, F; Liikamaa, R; Seppälä, J; Smith, R P; Teuho, J; Vieillard, L

    2002-01-01

    The Compact Muon Solenoid (CMS) is one of the general-purpose detectors to be provided for the LHC project at CERN. The design field of the CMS superconducting magnet is 4 T, the magnetic length is 12.5 m and the free bore is 6 m. Approximately 2000 km of superconducting strand is under procurement for the conductor of the CMS superconducting solenoid. Each strand length is required to be an integral multiple of 2.75 km. The strand is composed of copper- stabilized multifilamentary Nb-Ti with Nb barrier. Individual strands are identified by distinctive patterns of Nb-Ti filaments selected during stacking of the monofilaments. The statistics of piece length, measurements of I/sub c/, n-value, copper RRR, (Cu+Nb)/Nb-Ti ratio, as well as the results of independent cross checks of these quantities, are presented. A study was performed on the CMS strands to investigate the critical current degradation due to various heat treatments. The degradation versus annealing temperature and duration are reported. (4 refs).

  5. Life cycle guideline of petrochemical plant underground piping system

    Directory of Open Access Journals (Sweden)

    Shih Jeng-Ywan

    2017-01-01

    Full Text Available According to statistics of petrochemical plant disaster, the type of underground pipeline leakage is the highest proportion, for example, Kaohsiung gas explosion in 2014 is a typical case. Therefore, improvement strategy of petrochemical plant underground piping system from both engineering and management becomes an important issue. Through reviewing regulations as well as surveying questionnaire, including kinds of piping materials, 3D drawing files, operation procedures, information sharing, etc., the findings show lack contact of integrated management with engineering executive and insufficient technical requirements are major defects. Overviewing current problems of domestic petrochemical plant underground piping system management, and comparing to international criteria and specifications, this research focuses on the of piping design, construction, operations, maintenance, and inspection. Then management procedures and engineering technical feasibility strategies are suggested. In addition, the proposed life cycle guideline in order to reduce the disaster incidence of petrochemical plant underground pipelines.

  6. Evaluation of advanced hydraulic turbomachinery for underground pumped hydroelectric storage. Part 2. Two-stage regulated pump/turbines for operating heads of 1000 to 1500 m

    Energy Technology Data Exchange (ETDEWEB)

    Blomquist, C.A.; Frigo, A.A.; Degnan, J.R.

    1979-10-01

    This UPHS report applies to Francis-type, reversible pump/turbines regulated with gating systems. The first report, however, covered single-stage regulations; this report covers two-stage regulations. Development of a two-stage regulated pump/turbine appears to be attractive because the proposed single-drop UPHS concept requires turbomachinery with a head range of 1000 to 2000 m. With turbomachinery of this range available, the single-drop scheme offers a simple and economic UPHS option. Six different two-stage, top-gated pump/turbines have been analyzed: three that generate 500 MW and three that generate 350 MW. In each capacity, one machine has an operating head of 1000 m, another has a head of 1250 m, and the third has a head of 1500 m. The rated efficiencies of the machines vary from about 90% (1000-m head) to about 88% (1500-m head). Costs in 1978 $/kW for the three 500-MW units are: 20.5 (1000 m), 16.5 (1250 m), and 13.5 (1500 m). Corresponding costs for the three 350-MW units are 23, 18, and 14 $/kW. No major turbomachinery obstacles are foreseen that could hamper development of these pump/turbines. Further model testing and development are needed before building them.

  7. Going Underground in Singapore

    CERN Multimedia

    John Osborne (GS/SEM)

    2010-01-01

    Singapore has plans to build a massive Underground Science City (USC) housing R&D laboratories and IT data centres. A delegation involved in the planning to build the subterranean complex visited CERN on 18 October 2010 to learn from civil engineers and safety experts about how CERN plans and constructs its underground facilities.   The delegation from Singapore. The various bodies and corporations working on the USC project are currently studying the feasibility of constructing up to 40 caverns (60 m below ground) similar in size to an LHC experiment hall, in a similar type of rock. Civil engineering and geotechnical experts are calculating the maximum size of the cavern complex that can be safely built. The complex could one day accommodate between 3000 and 5000 workers on a daily basis, so typical issues of size and number of access shafts need to be carefully studied. At first glance, you might not think the LHC has much in common with the USC project; as Rolf Heuer pointed out: &ldq...

  8. Underground storage tank program

    International Nuclear Information System (INIS)

    Lewis, M.W.

    1994-01-01

    Underground storage tanks, UST'S, have become a major component of the Louisville District's Environmental Support Program. The District's Geotechnical and Environmental Engineering Branch has spear-headed an innovative effort to streamline the time, effort and expense for removal, replacement, upgrade and associated cleanup of USTs at military and civil work installations. This program, called Yank-A-Tank, creates generic state-wide contracts for removal, remediation, installation and upgrade of storage tanks for which individual delivery orders are written under the basic contract. The idea is to create a ''JOC type'' contract containing all the components of work necessary to remove, reinstall or upgrade an underground or above ground tank. The contract documents contain a set of generic specifications and unit price books in addition to the standard ''boiler plate'' information. Each contract requires conformance to the specific regulations for the state in which it is issued. The contractor's bid consists of a bid factor which in the multiplier used with the prices in the unit price book. The solicitation is issued as a Request for Proposal (RPP) which allows the government to select a contractor based on technical qualification an well as bid factor. Once the basic contract is awarded individual delivery orders addressing specific areas of work are scoped, negotiated and awarded an modifications to the original contract. The delivery orders utilize the prepriced components and the contractor's factor to determine the value of the work

  9. RP delves underground

    CERN Document Server

    Anaïs Schaeffer

    2011-01-01

    The LHC’s winter technical stop is rapidly approaching. As in past years, technical staff in their thousands will be flocking to the underground areas of the LHC and the Linac2, Booster, PS and SPS injectors. To make sure they are protected from ionising radiation, members of the Radiation Protection Group will perform an assessment of the levels of radioactivity in the tunnels as soon as the beams have stopped.   Members of the Radiation Protection Group with their precision instruments that measure radioactivity. At 7-00 a.m. on 8 December the LHC and all of the upstream accelerators will begin their technical stop. At 7-30 a.m., members of the Radiation Protection Group will enter the tunnel to perform a radiation mapping, necessary so that the numerous teams can do their work in complete safety. “Before we proceed underground, we always check first to make sure that the readings from the induced radioactivity monitors installed in the tunnels are all normal,&rdqu...

  10. Using Experiment and Computer Modeling to Determine the Off-Axis Magnetic Field of a Solenoid

    Science.gov (United States)

    Lietor-Santos, Juan Jose

    2014-01-01

    The study of the ideal solenoid is a common topic among introductory-based physics textbooks and a typical current arrangement in laboratory hands-on experiences where the magnetic field inside a solenoid is determined at different currents and at different distances from its center using a magnetic probe. It additionally provides a very simple…

  11. Plasma heating in a long solenoid by a laser or a relativistic electron beam

    International Nuclear Information System (INIS)

    Tajima, T.

    1975-01-01

    Advances in the technology of a large energy laser and/or relativistic electron beam (REB) generator have made it possible to seriously consider a long solenoid reactor concept. This concept has been reviewed. The physical problems in the plasma heating of the long solenoid by a laser or a REB are studied

  12. Three-dimensional Simulation and Prediction of Solenoid Valve Failure Mechanism Based on Finite Element Model

    Science.gov (United States)

    Li, Jianfeng; Xiao, Mingqing; Liang, Yajun; Tang, Xilang; Li, Chao

    2018-01-01

    The solenoid valve is a kind of basic automation component applied widely. It’s significant to analyze and predict its degradation failure mechanism to improve the reliability of solenoid valve and do research on prolonging life. In this paper, a three-dimensional finite element analysis model of solenoid valve is established based on ANSYS Workbench software. A sequential coupling method used to calculate temperature filed and mechanical stress field of solenoid valve is put forward. The simulation result shows the sequential coupling method can calculate and analyze temperature and stress distribution of solenoid valve accurately, which has been verified through the accelerated life test. Kalman filtering algorithm is introduced to the data processing, which can effectively reduce measuring deviation and restore more accurate data information. Based on different driving current, a kind of failure mechanism which can easily cause the degradation of coils is obtained and an optimization design scheme of electro-insulating rubbers is also proposed. The high temperature generated by driving current and the thermal stress resulting from thermal expansion can easily cause the degradation of coil wires, which will decline the electrical resistance of coils and result in the eventual failure of solenoid valve. The method of finite element analysis can be applied to fault diagnosis and prognostic of various solenoid valves and improve the reliability of solenoid valve’s health management.

  13. A large superconducting thin solenoid for the STAR experiment at RHIC

    International Nuclear Information System (INIS)

    Green, M.A.

    1992-06-01

    This Report describes the 4.4 meter, warm bore diameter, thin superconducting solenoid, for the proposed STAR experiment at the Brookhaven National Laboratory. The STAR solenoid will generate a very uniform central magnetic induction of 0.5 T within a space which is 4.0 meters in diameter by 4.2 meters long. The solenoid and its cryostat will be 0.7 radiation lengths thick over a length of 5.45 meters, about the center of the magnet making it the largest solenoid less than one radiation length to be built. This report describes a proposed design for the solenoid and cryostat, its flux return iron, its cryogenic system and its power supply and quench protection system

  14. Detector solenoid compensation in the PEP-II B-Factory

    International Nuclear Information System (INIS)

    Nosochkov, Y.; Cai, Y.; Irwin, J.; Sullivan, M.

    1995-01-01

    The PEP-II experimental detector includes a strong 1.5 T solenoid field in the interaction region (IR). With the fringe fields, the solenoid extends over a range of 6 m. Additional complications are that (1) it is displaced longitudinally from the interaction point (IP) by about 40 cm, (2) neither beam is parallel to the solenoid axis, and (3) the solenoid overlaps a dipole and a quadrupole on either side of the IP. In each half IR the correction system includes a set of skew quadrupoles, dipole correctors and normal quadrupoles to independently compensate the coupling, orbit perturbation, dispersion and focusing effect produced by the solenoid. The correction schemes for the Low Energy Ring (LER) and for the High Energy Ring (HER) are described, and the impact on the dynamic aperture is evaluated

  15. Silicon subsystem mechanical engineering closeout report for the Solenoidal Detector Collaboration

    International Nuclear Information System (INIS)

    Hanlon, J.; Christensen, R.W.; Hayman, G.; Jones, D.C.; Ross, R.; Wilds, W.; Yeamans, S.; Ziock, H.J.

    1995-01-01

    The authors group at Los Alamos National Laboratory was responsible for the mechanical engineering of the silicon tracking system of the Solenoidal Detector Collaboration (SDC) experiment of the Superconducting Super Collider (SSC) project. The responsibility included the overall design of the system from the mechanical point of view, development and integration of the cooling system, which was required to remove the heat generated by the front-end electronics, assembly of the system to extremely tight tolerances, and verification that the construction and operational stability and alignment tolerances would be met. A detailed description of the concepts they developed and the work they performed can be found in a report titled ''Silicon Subsystem Mechanical Engineering Work for the Solenoidal Detector Collaboration'' which they submitted to the SSC Laboratory. In addition to the mechanical engineering work, they also performed activation, background, and shielding studies for the SSC program. Much of the work they performed was potentially useful for other future high energy physics (HEP) projects. This report describes the closeout work that was performed for the Los Alamos SDC project. Four major tasks were identified for completion: (1) integration of the semi-automated assembly station being developed and construction of a precision part to demonstrate solutions to important general assembly problems (the station was designed to build precision silicon tracker subassemblies); (2) build a state-of-the-art TV holography (TVH) system to use for detector assembly stability tests; (3) design, build, and test a water based cooling system for a full silicon shell prototype; and (4) complete and document the activation, background, and shielding studies, which is covered in a separate report

  16. Decommissioning of underground structures, systems and components

    International Nuclear Information System (INIS)

    2006-01-01

    A large number of operational and shut down nuclear installations have underground systems, structures and components such as pipes, tanks or vaults. This practice of incorporating such features into the design of nuclear facilities has been in use for an extended period of time during which decommissioning was not perceived as a serious issue and was rarely considered in plant design and construction. Underground features can present formidable decontamination and/or dismantling issues, and these are addressed in this report. Decommissioning issues include, among others, difficulty of access, the possible need for remotely operated technologies, leakage of the contents and the resulting contamination of foundations and soil, as well as issues such as problematic radiological characterization. Although to date there have been more than 40 IAEA publications on decommissioning, none of them has ever addressed this subject. Although cases of decommissioning of such facilities have been described in the technical literature, no systematic treatment of relevant decommissioning strategies and technologies is currently available. It was perhaps assumed that generic decontamination and dismantling approaches would also be adequate for these 'difficult' facilities. This may be only partly true due to a number of unique physical, layout and radiological characteristics. With growing experience in the decommissioning field, it is timely to address this subject in a systematic and comprehensive fashion. Practical guidance is given in this report on relevant decommissioning strategies and technologies for underground features of facilities. Also described are alternative design and construction approaches that could facilitate a smoother path forward through the decommissioning process. The objective of this report is to highlight important points in the decommissioning of underground systems, structures or components for policy makers, operators, waste managers and other

  17. Underground reactor containments: An option for the future?

    International Nuclear Information System (INIS)

    Forsberg, C.W.; Kress, T.

    1997-01-01

    Changing world conditions and changing technologies suggest that serious consideration should be given to siting of nuclear power plants underground. Underground siting is not a new concept. Multiple research reactors, several weapons production reactors, and one power reactor have been built underground. What is new are the technologies and incentives that may now make underground siting a preferred option. The conditions and technologies, along with their implications, are discussed herein. Underground containments can be constructed in mined cavities or pits that are then backfilled with thick layers of rock and soil. Conventional above-ground containments resist assaults and accidents because of the strength of their construction materials and the effectiveness of their safety features that are engineered to reduce loads. However, underground containments can provide even more resistance to assaults and accidents because of the inertia of the mass of materials over the reactor. High-technology weapons or some internal accidents can cause existing strong-material containments to fail, but only very-high energy releases can move large inertial masses associated with underground containments. New methods of isolation may provide a higher confidence in isolation that is independent of operator action

  18. Underground layout tradeoff study

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents the results of a technical and economic comparative study of four alternative underground layouts for a nuclear waste geologic repository in salt. The four alternatives considered in this study are (1) separate areas for spent fuel (SF) and commercial high-level waste (CHLW); (2) panel alternation, in which SF and CHLW are emplaced in adjacent panels of rooms; (3) room alternation, in which SF and CHLW are emplaced in adjacent rooms within each panel; and (4) intimate mixture, in which SF and CHLW are emplaced in random order within each storage room. The study concludes that (1) cost is not an important factor; (2) the separate-areas and intimate-mixture alternatives appear, technically, to be more desirable than the other alternatives; and (3) the selection between the separate-areas and intimate mixture alternatives depends upon future resolution of site-specific and reprocessing questions. 5 refs., 6 figs., 12 tabs

  19. Underground space planning in Helsinki

    Directory of Open Access Journals (Sweden)

    Ilkka Vähäaho

    2014-10-01

    Full Text Available This paper gives insight into the use of underground space in Helsinki, Finland. The city has an underground master plan (UMP for its whole municipal area, not only for certain parts of the city. Further, the decision-making history of the UMP is described step-by-step. Some examples of underground space use in other cities are also given. The focus of this paper is on the sustainability issues related to urban underground space use, including its contribution to an environmentally sustainable and aesthetically acceptable landscape, anticipated structural longevity and maintaining the opportunity for urban development by future generations. Underground planning enhances overall safety and economy efficiency. The need for underground space use in city areas has grown rapidly since the 21st century; at the same time, the necessity to control construction work has also increased. The UMP of Helsinki reserves designated space for public and private utilities in various underground areas of bedrock over the long term. The plan also provides the framework for managing and controlling the city's underground construction work and allows suitable locations to be allocated for underground facilities. Tampere, the third most populated city in Finland and the biggest inland city in the Nordic countries, is also a good example of a city that is taking steps to utilise underground resources. Oulu, the capital city of northern Finland, has also started to ‘go underground’. An example of the possibility to combine two cities by an 80-km subsea tunnel is also discussed. A new fixed link would generate huge potential for the capital areas of Finland and Estonia to become a real Helsinki-Tallinn twin city.

  20. Design of the pancake-winding central solenoid coil

    International Nuclear Information System (INIS)

    Yoshida, Kiyoshi; Nishi, Masataka; Tsuji, Hirosi

    1995-01-01

    There was a debate over whether a pancake-winding or layer-winding technique is more appropriate for the Central Solenoid (CS) coil for ITER superconducting magnet. The layer-winding CS has the advantage of homogeneous winding supporting the TF centering force without weak joints, but has many difficulties during manufacturing and quality control. On other hand, the pancake-winding has the advantage of better quality control during manufacturing and module testing but has difficulties with joints and feeders, and pipes located in the load path of the bucking force from the toroidal field coils. The compact joints, reinforcement by preformed amour, sharp bending, and double seals are applied to the design of pancake-winding CS coil and demonstrated by hardware developments. The pancake-winding CS coil by using modified existing technology is compatible with the bucking concept of the ITER magnet system. (author)

  1. Conceptual fusion reactor designs based on the laser heat solenoid

    International Nuclear Information System (INIS)

    Steinhauer, L.C.

    1976-01-01

    The feasibility of the laser heated solenoid (LHS) as an approach to fusion and fusion-fission commercial power generation has been examined. The LHS concept is based on magnetic confinement of a long slender plasma column which is partly heated by the axially directed beam from a powerful long wavelength laser. As a pure fusion concept, the LHS configurations studied so far are characterized by fairly difficult engineering constraints, particularly on the magnet, a large laser, and a marginally acceptable system energy balance. As a fusion-fission system, however, the LHS is capable of a very attractive energy balance, has much more relaxed engineering constraints, requires a relatively modest laser, and as such holds great potential as a power generator and fissile fuel breeding scheme

  2. Fusion--fission hybrid reactors based on the laser solenoid

    International Nuclear Information System (INIS)

    Steinhauer, L.C.; Taussig, R.T.; Quimby, D.C.

    1976-01-01

    Fusion-fission reactors, based on the laser solenoid concept, can be much smaller in scale than their pure fusion counterparts, with moderate first-wall loading and rapid breeding capabilities (1 to 3 tonnes/yr), and can be designed successfully on the basis of classical plasma transport properties and free-streaming end-loss. Preliminary design information is presented for such systems, including the first wall, pulse coil, blanket, superconductors, laser optics, and power supplies, accounting for the desired reactor performance and other physics and engineering constraints. Self-consistent point designs for first and second generation reactors are discussed which illustrate the reactor size, performance, component parameters, and the level of technological development required

  3. submitter Starting Manufacture of the ITER Central Solenoid

    CERN Document Server

    Libeyre, P; Dolgetta, N; Gaxiola, E; Jong, C; Lyraud, C; Mitchell, N; Journeaux, J Y; Vollmann, T; Evans, D; Sgobba, S; Langeslag, S; Reiersen, W; Martovetsky, N; Everitt, D; Hatfield, D; Rosenblad, P; Litherland, S; Freudenberg, K; Myatt, L; Smith, J; Brazelton, C; Abbott, R; Daubert, J; Rackers, K; Nentwich, T

    2016-01-01

    The central solenoid (CS) is a key component of the ITER magnet system to provide the magnetic flux swing required to drive induced plasma current up to 15 MA. The manufacture of its different subcomponents has now started, following completion of the design analyses and achievement of the qualification of the manufacturing procedures. A comprehensive set of analyses has been produced to demonstrate that the CS final design meets all requirements. This includes in particular structural analyses carried out with different finite-element models and addressing normal and fault conditions. Following the Final Design Review, held in November 2013, and the subsequent design modifications, the analyses were updated for consistency with the final design details and provide evidence that the Magnet Structural Design Criteria are fully met. Before starting any manufacturing activity of a CS component, a corresponding dedicated qualification program has been carried out. This includes manufacture of mockups using the re...

  4. Start-up of spherical tokamak without a center solenoid

    International Nuclear Information System (INIS)

    Maekawa, Takashi; Nagata, Masayoshi

    2012-01-01

    For low-aspect tokamak reactors, spherical tokamak reactors, ST-type FESF/CTFs, it is essential to remove or minimize a central solenoid (CS). Even with the minimized CS, non-inductive start up of the plasma current is required. Rapid increase in the spontaneous plasma current at the final stage of current start-up drives ignition. At the initial stage, formation of plasma and magnetic surfaces are required. As non-inductive plasma start-up scenarios, ECH/ECCD, LHCD, HHFW, DC HELICITY injection, plasma merging and NBI have been studied. In the present article, the present status and future prospect of experimental and theoretical works on these subjects. (author)

  5. Numerical analysis of modified Central Solenoid insert design

    International Nuclear Information System (INIS)

    Khodak, Andrei; Martovetsky, Nicolai; Smirnov, Aleksandre; Titus, Peter

    2015-01-01

    Highlights: • Modified design of coil for testing ITER superconducting cable is presented. • Numerical analysis allowed design verification. • Three-dimensional current sharing temperature distributions are obtained from the results. - Abstract: The United States ITER Project Office (USIPO) is responsible for fabrication of the Central Solenoid (CS) for ITER project. The ITER machine is currently under construction by seven parties in Cadarache, France. The CS Insert (CSI) project should provide a verification of the conductor performance in relevant conditions of temperature, field, currents and mechanical strain. The US IPO designed the CSI that will be tested at the Central Solenoid Model Coil (CSMC) Test Facility at JAEA, Naka. To validate the modified design three-dimensional numerical simulations were performed using coupled solver for simultaneous structural, thermal and electromagnetic analysis. Thermal and electromagnetic simulations supported structural calculations providing necessary loads and strains. According to current analysis design of the modified coil satisfies ITER magnet structural design criteria for the following conditions: (1) room temperature, no current, (2) temperature 4 K, no current, (3) temperature 4 K, current 60 kA direct charge, and (4) temperature 4 K, current 60 kA reverse charge. Fatigue life assessment analysis is performed for the alternating conditions of: temperature 4 K, no current, and temperature 4 K, current 45 kA direct charge. Results of fatigue analysis show that parts of the coil assembly can be qualified for up to 1 million cycles. Distributions of the Current Sharing Temperature (TCS) in the superconductor were obtained from numerical results using parameterization of the critical surface in the form similar to that proposed for ITER. Special ADPL scripts were developed for ANSYS allowing one-dimensional representation of TCS along the cable, as well as three-dimensional fields of TCS in superconductor

  6. Numerical analysis of modified Central Solenoid insert design

    Energy Technology Data Exchange (ETDEWEB)

    Khodak, Andrei, E-mail: akhodak@pppl.gov [Princeton Plasma Physics Laboratory, Princeton, NJ (United States); Martovetsky, Nicolai; Smirnov, Aleksandre [Oak Ridge National Laboratory, Oak Ridge, TN (United States); Titus, Peter [Princeton Plasma Physics Laboratory, Princeton, NJ (United States)

    2015-10-15

    Highlights: • Modified design of coil for testing ITER superconducting cable is presented. • Numerical analysis allowed design verification. • Three-dimensional current sharing temperature distributions are obtained from the results. - Abstract: The United States ITER Project Office (USIPO) is responsible for fabrication of the Central Solenoid (CS) for ITER project. The ITER machine is currently under construction by seven parties in Cadarache, France. The CS Insert (CSI) project should provide a verification of the conductor performance in relevant conditions of temperature, field, currents and mechanical strain. The US IPO designed the CSI that will be tested at the Central Solenoid Model Coil (CSMC) Test Facility at JAEA, Naka. To validate the modified design three-dimensional numerical simulations were performed using coupled solver for simultaneous structural, thermal and electromagnetic analysis. Thermal and electromagnetic simulations supported structural calculations providing necessary loads and strains. According to current analysis design of the modified coil satisfies ITER magnet structural design criteria for the following conditions: (1) room temperature, no current, (2) temperature 4 K, no current, (3) temperature 4 K, current 60 kA direct charge, and (4) temperature 4 K, current 60 kA reverse charge. Fatigue life assessment analysis is performed for the alternating conditions of: temperature 4 K, no current, and temperature 4 K, current 45 kA direct charge. Results of fatigue analysis show that parts of the coil assembly can be qualified for up to 1 million cycles. Distributions of the Current Sharing Temperature (TCS) in the superconductor were obtained from numerical results using parameterization of the critical surface in the form similar to that proposed for ITER. Special ADPL scripts were developed for ANSYS allowing one-dimensional representation of TCS along the cable, as well as three-dimensional fields of TCS in superconductor

  7. Underground storage of natural gas and LPG

    International Nuclear Information System (INIS)

    1990-01-01

    The Symposium attended by over 200 participants from 23 member countries of the Economic Commission for Europe (ECE), representatives from Australia, Iraq, Israel, Kuwait as well as from 5 international organizations, provided an opportunity for existing and prospective gas markets in the ECE region to exchange experience and information on current trends and developments in natural gas and liquefied petroleum gas underground storage, especially in technical and regulatory matters, including economic, market and social considerations, that influence the planning, development and operations of gas storage facilities. Environmental and safety factors associated with such operations were also examined. A separate abstract was prepared for each of the presented papers. Refs, figs and tabs

  8. Design, construction and initial state of the underground openings

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    The report is included in a set of Production reports, presenting how the KBS-3 repository is designed, produced and inspected. The set of reports is included in the safety report for the KBS-3 repository and repository facility. The report provides input on the initial state of the underground openings for the assessment of the long-term safety, SR-Site. The initial state refers to the properties of the underground openings at final disposal, backfilling or closure. In addition, the report provides input to the operational safety report, SR-Operation, on how the underground openings shall be constructed and inspected. The report presents the design premises and the methodology applied to design the underground openings and adapt them the to the site conditions so that they conform to the design premises. It presents the reference design at Forsmark and its conformity to the design premises. It also describes the reference methods to be applied to construct and inspect the different kinds of underground openings. Finally, the initial state of the underground openings and its conformity to the design premises is presented

  9. KAERI underground research tunnel (KURT)

    International Nuclear Information System (INIS)

    Cho, Won Jin; Kwon, Sang Ki; Park, Jeong Hwa; Choi, Jong Won

    2007-01-01

    An underground research tunnel is essential to validate the integrity of a high-level waste disposal system, and the safety of geological disposal. In this study, KAERI underground research tunnel (KURT) was constructed in the site of Korea Atomic Energy Research Institute(KAERI). The results of the site investigation and the design of underground tunnel were presented. The procedure for the construction permits and the construction of KURT were described briefly. The in-situ experiments being carried out at KURT were also introduced

  10. Temperature and current margin of ITER central solenoid conductor designs during a 15 MA plasma scenario

    Science.gov (United States)

    Rolando, G.; Devred, A.; Nijhuis, A.

    2014-02-01

    The plasma current of the international thermonuclear experimental reactor (ITER) will be induced by current pulses in the central solenoid (CS). The foreseen lifetime and operating conditions, with currents up to 45 kA at 13 T, pose significant mechanical challenges for the brittle Nb3Sn strands. On top of this, inter-strand coupling loss should remain restricted during pulsed operation to ensure an achievable repetition rate of plasma cycles. In order to address the degradation of Nb3Sn cable-in-conduit conductors (CICCs) with electromagnetic and thermal load cycling, four alternative cable designs have recently been tested in both DC and AC modes. However, the actual operating conditions experienced by the CS conductor within the ITER magnet system in terms of time-varying magnetic field and current cannot be fully reproduced in existing experimental facilities. In this paper, we present the results of the numerical assessment of the electromagnetic performance of the four ITER CS conductor designs during a 15 MA plasma scenario. The analysis was carried out with the code JackPot-ACDC including the voltage-current characteristic of all superconducting strands.

  11. Dynamic underground stripping demonstration project

    International Nuclear Information System (INIS)

    Newmark, R.L.

    1992-04-01

    LLNL is collaborating with the UC Berkeley College of Engineering to develop and demonstrate a system of thermal remediation techniques for rapid cleanup of localized underground spills. Called dynamic stripping to reflect the rapid and controllable nature of the process, it will combine steam injection, direct electrical heating, and tomographic geophysical imaging in a cleanup of the LLNL gasoline spill. In the first eight months of the project, a Clean Site engineering test was conducted to prove the field application of the techniques. Tests then began on the contaminated site in FY 1992. This report describes the work at the Clean Site, including design and performance criteria, test results, interpretations, and conclusions. We fielded 'a wide range of new designs and techniques, some successful and some not. In this document, we focus on results and performance, lessons learned, and design and operational changes recommended for work at the contaminated site. Each section focuses on a different aspect of the work and can be considered a self-contained contribution

  12. Design of solenoid magnet with slender majority of transverse magnetic field

    International Nuclear Information System (INIS)

    Dai Zhiyong; Liu Chengjun

    1998-12-01

    The solenoid magnet design for a 20 MeV flash X-radiography is presented. Prototype solenoid magnets have been demonstrated that it has a magnetic axis tilt less than 1 mrad and magnetic axis offset 0.2 mm, respectively. The design features of the solenoid magnets, which are slender majority of transverse magnetic field and high precision of magnetic alignment, have been proved to meet the 20 MeV linear induction accelerator performance goals by the experiments of the 2 MeV injector

  13. Orbital parameters of proton and deuteron beams in the NICA collider with solenoid Siberian snakes

    International Nuclear Information System (INIS)

    Kovalenko, A D; Butenko, A V; Kekelidze, V D; Mikhaylov, V A; Kondratenko, M A; Filatov, Yu N; Kondratenko, A M

    2016-01-01

    Two solenoid Siberian snakes are required to obtain ion polarization in the “spin transparency” mode of the NICA collider. The field integrals of the solenoid snakes for protons and deuterons at maximum momentum of 13.5 GeV/c are equal to 2×50 T·m and 2×160 T·m respectively. The snakes introduce strong betatron oscillation coupling. The calculations of orbital parameters of proton and deuteron beams in NICA collider with solenoid snakes are presented. (paper)

  14. Spin Transparency Mode in the NICA Collider with Solenoid Siberian Snakes for Proton and Deuteron Beam

    Science.gov (United States)

    Kovalenko, A. D.; Butenko, A. V.; Mikhaylov, V. A.; Kondratenko, M. A.; Kondratenko, A. M.; Filatov, Yu N.

    2017-12-01

    Two solenoid Siberian Snakes are required to obtain ion polarization in spin transparency mode of the NICA collider. The snake solenoids with a total field integral of 2×50 T·m are placed into the straight sections of the NICA collider. It allows one to control polarization of protons and deuterons up to 13.5 GeV/c and 4 GeV/c respectively. The snakes introduce a strong betatron oscillation coupling. The calculations of orbital parameters of proton and deuteron beams in the NICA collider with solenoid Snakes are presented.

  15. New method for generating linear transfer matrices through combined rf and solenoid fields

    Science.gov (United States)

    Gulliford, Colwyn; Bazarov, Ivan

    2012-02-01

    We present a new method for computing the transverse transfer matrix for superimposed axisymmetric rf and solenoid field maps. The algorithm constructs the transfer matrix directly from one-dimensional rf and solenoid field maps without computing numerical derivatives or eigenfunction expansions of the field map data. In addition, this method accurately describes the dynamics of low energy particles starting from a solenoid-immersed cathode, allowing the method to simulate transport through both rf and electrostatic guns. Comparison of particle tracking with the transfer matrix, and direct integration of the equations of motion through several field setups, shows excellent agreement between the two methods.

  16. New method for generating linear transfer matrices through combined rf and solenoid fields

    Directory of Open Access Journals (Sweden)

    Colwyn Gulliford

    2012-02-01

    Full Text Available We present a new method for computing the transverse transfer matrix for superimposed axisymmetric rf and solenoid field maps. The algorithm constructs the transfer matrix directly from one-dimensional rf and solenoid field maps without computing numerical derivatives or eigenfunction expansions of the field map data. In addition, this method accurately describes the dynamics of low energy particles starting from a solenoid-immersed cathode, allowing the method to simulate transport through both rf and electrostatic guns. Comparison of particle tracking with the transfer matrix, and direct integration of the equations of motion through several field setups, shows excellent agreement between the two methods.

  17. Underground Facilities, Technological Challenges

    CERN Document Server

    Spooner, N

    2010-01-01

    This report gives a summary overview of the status of international under- ground facilities, in particular as relevant to long-baseline neutrino physics and neutrino astrophysics. The emphasis is on the technical feasibility aspects of creating the large underground infrastructures that will be needed in the fu- ture to house the necessary detectors of 100 kton to 1000 kton scale. There is great potential in Europe to build such a facility, both from the technical point of view and because Europe has a large concentration of the necessary engi- neering and geophysics expertise. The new LAGUNA collaboration has made rapid progress in determining the feasibility for a European site for such a large detector. It is becoming clear in fact that several locations are technically fea- sible in Europe. Combining this with the possibility of a new neutrino beam from CERN suggests a great opportunity for Europe to become the leading centre of neutrino studies, combining both neutrino astrophysics and neutrino beam stu...

  18. An embedded underground navigation system

    CSIR Research Space (South Africa)

    Hlophe, K

    2011-11-01

    Full Text Available Platform pose (localization and orientation) information is a key requirement for autonomous mobile systems. The severe natural conditions and complex terrain of underground mines diminish the capability of most pose estimation systems, especially...

  19. Electric power underground distribution at the campus of the Sao Paulo university - project, installation and operation; Distribuicao subterranea no campus da Cidade Universitaria da USP - projeto, instalacao e operacao

    Energy Technology Data Exchange (ETDEWEB)

    Hashimoto, Kleber; Bussolini, Miguel [Sao Paulo Univ., SP (Brazil)

    1999-07-01

    This paper describes the new electric power distribution system at the main campus of the University of Sao Paulo - Brazil. This system aims to attain a high level of reliability in the electric power supply, with costs less than the present underground system.

  20. THE INFLUENCE OF INSTITUTIONAL STRATEGIES ON THE UNDERGROUND ECONOMY

    Directory of Open Access Journals (Sweden)

    Ciprian Tudurachi

    2014-12-01

    Full Text Available The fight against shadow economy must be addressed not only as a permanent concern of economic analysts and decision-makers, but rather as a problematic ethical-moral nature affecting economic and interpersonal relations, as strategic and operational object. The authors attempt outline an institutional management strategy geared towards underground economy combating has as objective the strands establishment without having exhaustiveness claim. We make a case for extending the implementation of a coherent program, strategic and operational, and its adoption as a way of institutional management in the context it really wants to launch a concerted offensive to combat the underground economy.

  1. Proximity detection system underground

    Energy Technology Data Exchange (ETDEWEB)

    Denis Kent [Mine Site Technologies (Australia)

    2008-04-15

    Mine Site Technologies (MST) with the support ACARP and Xstrata Coal NSW, as well as assistance from Centennial Coal, has developed a Proximity Detection System to proof of concept stage as per plan. The basic aim of the project was to develop a system to reduce the risk of the people coming into contact with vehicles in an uncontrolled manner (i.e. being 'run over'). The potential to extend the developed technology into other areas, such as controls for vehicle-vehicle collisions and restricting access of vehicle or people into certain zones (e.g. non FLP vehicles into Hazardous Zones/ERZ) was also assessed. The project leveraged off MST's existing Intellectual Property and experience gained with our ImPact TRACKER tagging technology, allowing the development to be fast tracked. The basic concept developed uses active RFID Tags worn by miners underground to be detected by vehicle mounted Readers. These Readers in turn provide outputs that can be used to alert a driver (e.g. by light and/or audible alarm) that a person (Tag) approaching within their vicinity. The prototype/test kit developed proved the concept and technology, the four main components being: Active RFID Tags to send out signals for detection by vehicle mounted receivers; Receiver electronics to detect RFID Tags approaching within the vicinity of the unit to create a long range detection system (60 m to 120 m); A transmitting/exciter device to enable inner detection zone (within 5 m to 20 m); and A software/hardware device to process & log incoming Tags reads and create certain outputs. Tests undertaken in the laboratory and at a number of mine sites, confirmed the technology path taken could form the basis of a reliable Proximity Detection/Alert System.

  2. Beam collimation and transport of laser-accelerated protons by a solenoid field

    International Nuclear Information System (INIS)

    Harres, K; Alber, I; Guenther, M; Nuernberg, F; Otten, A; Schuetrumpf, J; Roth, M; Tauschwitz, A; Bagnoud, V; Daido, H; Tampo, M; Schollmeier, M

    2010-01-01

    A pulsed high field solenoid was used in a laser-proton acceleration experiment to collimate and transport the proton beam that was generated at the irradiation of a flat foil by a high intensity laser pulse. 10 12 particles at an energy of 2.3 MeV could be caught and transported over a distance of more than 240 mm. Strong space charge effects occur, induced by the high field of the solenoid that forces all co-moving electrons down the the solenoid's axis, building up a strong negative space charge that interacts with the proton beam. This leads to an aggregation of the proton beam around the solenoid's axis and therefore to a stronger focusing effect. The collimation and transport of laser-accelerated protons is the first step to provide these unique beams for further applications like post-acceleration by conventional accelerator structures.

  3. Confinement of laser plasma by solenoidal field for laser ion source

    International Nuclear Information System (INIS)

    Okamura, M.; Kanesue, T.; Kondo, K.; Dabrowski, R.

    2010-01-01

    A laser ion source can provide high current, highly charged ions with a simple structure. However, it was not easy to control the ion pulse width. To provide a longer ion beam pulse, the plasma drift length, which is the distance between laser target and extraction point, has to be extended and as a result the plasma is diluted severely. Previously, we applied a solenoid field to prevent reduction of ion density at the extraction point. Although a current enhancement by a solenoid field was observed, plasma behavior after a solenoid magnet was unclear because plasma behavior can be different from usual ion beam dynamics. We measured a transverse ion distribution along the beam axis to understand plasma motion in the presence of a solenoid field.

  4. The electromagnetic calorimeter for the solenoidal tracker at RHIC. A Conceptual Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Beddo, M.E.; Bielick, E.; Dawson, J.W. [Argonne National Lab., IL (United States)] [and others; The STAR EMC Collaboration

    1993-09-22

    This report discusses the following on the electromagnetic calorimeter for the solenoidal tracker at RHIC: conceptual design; the physics of electromagnetic calorimetry in STAR; trigger capability; integration into STAR; and cost, schedule, manpower, and funding.

  5. The influence of the iron shield of the solenoid on spin tracking

    Directory of Open Access Journals (Sweden)

    Toprek Dragan

    2005-01-01

    Full Text Available The influence of the iron shield of the solenoid on spin tracking is studied in this paper. In the case of the 200 MeV proton, the study has been numerically done in the ZGOUBI code. The distribution of the magnetic field was done by POISSON. We have come to the conclusion that the influence of the solenoid’s shielding on spin tracking is the same at its entrance and exit and that is directly proportional to the intensity of the magnetic induction B on the axis of the solenoid. We have also determined that the influence of the solenoid’s shielding is much stronger on transversal components of the spin than on its longitudinal component. The differences between components of the spin for the shielded and not-shielded solenoid diminish with the in crease in the distance from the solenoid.

  6. Proceedings of the international workshop on solenoidal detectors for the SSC

    International Nuclear Information System (INIS)

    Abe, Fumio; Hasegawa, Katsuo

    1990-07-01

    This issue is the collection of the papers presented at the International Workshop on solenoidal detectors for the Superconducting Super Collider (SSC). The 48 of the presented papers are indexed individually. (J.P.N.)

  7. Design and analysis of direct action solenoid valve based on computational intelligence

    International Nuclear Information System (INIS)

    Liu Qianfeng; Bo Hanliang; Qin Benke

    2010-01-01

    Control Rod Hydraulic Drive Mechanism (CRHDM) is a newly invented patent of the Institute of Nuclear and New Energy Technology Tsinghua University which owns CRHDM's independent intellectual property rights while the integrated valve made up of three direct action solenoid valves is the key part of this mechanism. Therefore, the performance of the solenoid valve affects the integrated valve and the CRHDM directly. In this paper, we present a method to design the parameters of the direct action solenoid valve based on orthogonal experiment design, back propagation (BP) neural network and particle swarm optimization (PSO). The result proves that the method is feasible and accurate to design the parameters in order to obtain the biggest electromagnetic force. Besides, the result also shows that it is the current which influences the electromagnetic force of the direct action solenoid valve most.

  8. Non-inductive Solenoid-less Plasma Current Start-up in NSTX Using Transient CHI

    Energy Technology Data Exchange (ETDEWEB)

    Raman, R; Jarboe, T R; Nelson, B A; Bell, M G; Ono, M; Bigelow, T; Kaita, R; LeBlanc, B; Lee, K C; Maqueda, R; Menard, J; Paul, S

    2007-05-23

    Coaxial Helicity Injection (CHI) has been successfully used in the National Spherical Torus Experiment (NSTX) for a demonstration of closed flux current generation without the use of the central solenoid. The favorable properties of the Spherical Torus (ST) arise from its very small aspect ratio. However, small aspect ratio devices have very restricted space for a substantial central solenoid. Thus methods for initiating the plasma current without relying on induction from a central solenoid are essential for the viability of the ST concept. CHI is a promising candidate for solenoid-free plasma startup in a ST. The method has now produced closed flux current up to 160 kA verifying the high current capability of this method in a large ST built with conventional tokamak components.

  9. Beam collimation and transport of laser-accelerated protons by a solenoid field

    Energy Technology Data Exchange (ETDEWEB)

    Harres, K; Alber, I; Guenther, M; Nuernberg, F; Otten, A; Schuetrumpf, J; Roth, M [Technische Universitaet Darmstadt, Institut fuer Kernphysik, Schlossgartenstrasse 9, 64289 Darmstadt (Germany); Tauschwitz, A; Bagnoud, V [GSI - Hemholtzzentrum fur Schwerionenforschung GmbH, Plasmaphysik and PHELIX, Planckstrasse 1, 64291 Darmstadt (Germany); Daido, H; Tampo, M [Photo Medical Research Center, JAEA, 8-1 Umemidai, Kizugawa-city, Kyoto, 619-0215 (Japan); Schollmeier, M, E-mail: k.harres@gsi.d [Sandia National Laboratories, Albuquerque NM 87185 (United States)

    2010-08-01

    A pulsed high field solenoid was used in a laser-proton acceleration experiment to collimate and transport the proton beam that was generated at the irradiation of a flat foil by a high intensity laser pulse. 10{sup 12} particles at an energy of 2.3 MeV could be caught and transported over a distance of more than 240 mm. Strong space charge effects occur, induced by the high field of the solenoid that forces all co-moving electrons down the the solenoid's axis, building up a strong negative space charge that interacts with the proton beam. This leads to an aggregation of the proton beam around the solenoid's axis and therefore to a stronger focusing effect. The collimation and transport of laser-accelerated protons is the first step to provide these unique beams for further applications like post-acceleration by conventional accelerator structures.

  10. Applications of a superconducting solenoidal separator in the experimental investigation of nuclear reactions

    International Nuclear Information System (INIS)

    Hinde, D J; Carter, I P; Dasgupta, M; Simpson, E C; Cook, K J; Kalkal, Sunil; Luong, D H; Williams, E

    2017-01-01

    This paper describes applications of a novel superconducting solenoidal separator, with magnetic fields up to 8 Tesla, for studies of nuclear reactions using the Heavy Ion Accelerator Facility at the Australian National University. (paper)

  11. Efficiency evaluation of agricultural underground dam in South Korea

    Science.gov (United States)

    Myoung, W.; Song, S. H.; Yong, H. H.

    2017-12-01

    Climate change has resulted in severe droughts in a rice-planting season (i.e., April to June) in South Korea since 2012. Therefore, all time high-amount water resources in rice-farming seasons (i.e., April to October) were required against natural crises like droughts. The underground dam, which is able to increase groundwater amounts in the alluvium aquifer, has been considered to be an alternative for securing more groundwater resources. In this study, irrigation efficiencies of five pre-existing agricultural underground dams in South Korea were evaluated during the drought periods. A total amount of groundwater storage capacities in alluvial aquifers of these five ones were estimated approximate 15 × 107 m3: above 4 × 106 m3 for two underground dams (Ian, Namsong), 2 3 × 106 m3, for 2 dams (Oksung, Wooil), below 2 × 106 m3 for 1 dam (Gocheon), respectively. Irrigating amounts of groundwater accounted for three underground dams (Ian, Namsong, Gocheon), supplied in rice-farming season are 8.5 × 105 m3/year, 8.3 × 105 m3/year, 6.3 × 105 m3/year, respectively. The total demand of agricultural water in these underground dams is 2.0 × 106 m3/year, 1.9 × 106 m3/year, 2.2 × 106 m3/year, respectively. Irrigating amounts of groundwater accounted for whole of rice-farming area in South Korea is 4.3 × 108 m3/year whereas total demand of agricultural water is 9.4 × 109 m3/year. Groundwater were pumped from the radial collector wells located in the upstream from the underground dams. Oksung underground dam, one representative underground dam located in Chungnam province in South Korea, irrigated approximate 3 × 105 m3 during a dried rice-planting season (between April to June) in 2017. It was three times more than usual (9 × 104 m3). Groundwater levels during the same period maintained above 5.55 m, which was slightly lower than usual (6.00 m). Results of Oksung underground dam demonstrated that underground dams in South Korea were effectively operated against

  12. Performance of solenoids vs. quadrupoles in focusing and energy selection of laser accelerated protons

    OpenAIRE

    Hofmann, Ingo

    2013-01-01

    Using laser accelerated protons or ions for various applications—for example in particle therapy or short-pulse radiographic diagnostics—requires an effective method of focusing and energy selection. We derive an analytical scaling for the performance of a solenoid compared with a doublet/triplet as function of the energy, which is confirmed by TRACEWIN simulations. Generally speaking, the two approaches are equivalent in focusing capability, if parameters are such that the solenoid length ap...

  13. A solenoidal and monocusp ion source (SAMIS) (abstract){sup a}{sup b}

    Energy Technology Data Exchange (ETDEWEB)

    Burns, E.J.; Brainard, J.P.; Draper, C.H.; Ney, R.H. [Sandia National Laboratories, Albuquerque, New Mexico 87185-0516 (United States); Leung, K.N.; Perkins, L.T.; Williams, M.D.; Wilde, S.B. [Lawrence Berkeley Laboratory, University of California, Berkeley, California 94720 (United States)

    1996-03-01

    We have developed a new magnetic monocusp ion source for single aperture applications such as neutron generators. Coupling solenoidal magnetic fields on both sides of a monocusp magnetic field has generated over 70{percent} atomic deuterium ions at pressures as low as 0.4 Pa (3 mTorr). This article describes the performance and characteristics of the solenoidal and monocusp ion source. {copyright} {ital 1996 American Institute of Physics.}

  14. Fourier Bessel transform method for efficiently calculating the magnetic field of solenoids

    International Nuclear Information System (INIS)

    Nachamkin, J.; Maggiore, C.J.

    1980-01-01

    A numerical procedure for calculating the magnetic field of a selenoid is derived. Based on the properties of Bessel functions, the procedure is shown to be convergent everywhere, including within the windings of the solenoid. The most critical part of the procedure is detailed in the main text. A simple method is used to ensure numerical significance while allowing economical computational times. In the appendix the procedure is generalized to universal convergence by appropriate partitioning of the solenoid windings

  15. Operating Cigeo

    International Nuclear Information System (INIS)

    Launeau, F.

    2016-01-01

    The CIGEO facility dedicated to the geological disposal of high- and intermediate-level radioactive wastes will be composed of 2 parts: an underground facility at a depth of 500 m to dispose the waste packages in tunnels and a surface facility to take delivery of the wastes and prepare the packages. The underground facility will be built progressively and will cover a surface of 15 km 2 at the end of Cigeo operating-life. A large part of the surface facility (located a few km away from the waste reception place) will be dedicated to the works led deep underground to build the tunnels and will receive drilling cuttings. The article describes also the ramp and carts to lead waste packages underground. Most of the operations will be automated. The definitive closure of the tunnels will be made with swelling clay and concrete plugs. (A.C.)

  16. Impact of the Tilted Detector Solenoid on the Ion Polarization at JLEIC

    Science.gov (United States)

    Kondratenko, A. M.; Kondratenko, M. A.; Filatov, Yu N.; Derbenev, Ya S.; Lin, F.; Morozov, V. S.; Zhang, Y.

    2017-12-01

    Jefferson Lab Electron Ion Collider (JLEIC) is a figure-8 collider “transparent” to the spin. This allows one to control the ion polarization using a universal 3D spin rotator based on weak solenoids. Besides the 3D spin rotator, a coherent effect on the spin is produced by a detector solenoid together with the dipole correctors and anti-solenoids compensating betatron oscillation coupling. The 4 m long detector solenoid is positioned along a straight section of the electron ring and makes a 50 mrad horizontal angle with a straight section of the ion ring. Such a large crossing angle is needed for a quick separation of the two colliding beams near the interaction point to make sufficient space for placement of interaction region magnets and to avoid parasitic collisions of shortly-spaced 476 MHz electron and ion bunches. We present a numerical analysis of the detector solenoid effect on the proton and deuteron polarizations. We demonstrate that the effect of the detector solenoid on the proton and deuteron polarizations can be compensated globally using an additional 3D rotator located anywhere in the ring. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contracts DE-AC05-06OR23177 and DE-AC02-06CH11357.

  17. The hazardous nature of small scale underground mining in Ghana

    Directory of Open Access Journals (Sweden)

    K.J. Bansah

    2016-01-01

    Full Text Available Small scale mining continues to contribute significantly to the growth of Ghana's economy. However, the sector poses serious dangers to human health and the environment. Ground failures resulting from poorly supported stopes have led to injuries and fatalities in recent times. Dust and fumes from drilling and blasting of ore present health threats due to poor ventilation. Four prominent small scale underground mines were studied to identify the safety issues associated with small scale underground mining in Ghana. It is recognized that small scale underground mining in Ghana is inundated with unsafe acts and conditions including stope collapse, improper choice of working tools, absence of personal protective equipment and land degradation. Inadequate monitoring of the operations and lack of regulatory enforcement by the Minerals Commission of Ghana are major contributing factors to the environmental, safety and national security issues of the operations.

  18. COST ANALYSIS IN CONSTRUCTION OF UNDERGROUND MINING STRUCTURES AND OPPORTUNITIES FOR THEIR REDUCTION

    Directory of Open Access Journals (Sweden)

    Nikolinka Doneva

    2015-12-01

    Full Text Available The construction of underground mining facilities is of essential importance to the exploitation of mineral resources. Confirmation of this is the fact that the construction costs of main facilities occupy 40-60% of the underlying investments in the main construction and equipping. The main underground mining facilities are: shafts, drifts, raise, pump chambers, warehouses etc. This paper presents detailed analysis of underground mining facility - drift construction costs per individual working operations, following their change which depends on the rock type and profile size of underground mining facility, as well as possibilities of reducing these costs.

  19. Using of underground space and fundamental problems of preservation environments living of men

    International Nuclear Information System (INIS)

    Shemyakin, E.I.

    1995-01-01

    Trends in works related to problems on assimilation of the underground space as the medium for the Earth population future environment are considered. Three basic trends are separated: 1) geomechanical provision of works relative to underground space assimilation: 2) creation of underground objects with the long-term operation for disposal of radioactive wastes disposal from the nuclear energy and modern chemical production enterprises, as well as for location of underground power plants, enrichment facilities and other production enterprises; 3) assimilation of underground space in large cities. Geomechanical provision envisages evaluation of the massif block structure, creation of geomechanic monitoring system, site selection for mining enterprises and large-sized objects with an account of geodynamic perspective, especially in places intended for construction of underground NPPs and disposal of nuclear power and other highly-toxic wastes

  20. A system of two-dimensional drift chambers with printed-board cathodes and flat solenoidal delay lines

    International Nuclear Information System (INIS)

    Carbonara, F.; Chiefari, G.; Drago, E.; Merola, L.; Napolitano, M.; Rinzivillo, R.; Sciacca, G.; Visco, F.

    1980-01-01

    We describe the structure and performance of a system of 34 drift chambers, which has been in operation at the CERN Intersecting Storage Rings (ISR) since August 1977 in the experiment R209, p + p → μ + + μ - + X. The field shaping of the drift cell has been obtained by means of printed-board cathodes; the read-out is two-dimensional by means of 83 cm long flat solenoidal delay lines, wound around 200 μm thick vetronite strips. We report some results on the main operating features, like efficiency, rate capability, space resolution (wires = 250 μm; delay lines = 1.8 up to 4 mm) at a test beam and under ISR running conditions. (orig.)

  1. Evaluation method of radon preventing effect in underground construction

    International Nuclear Information System (INIS)

    Luo Shaodong; Deng Yuequan; Dong Faqin; Qu Ruixue; Xie Zhonglei

    2014-01-01

    Background: It's difficult to evaluate the radon prevention effect because of the short operating time of measuring instrument under the circumstances of high humidity in underground construction. Purpose: A new rapid method to evaluate the radon prevention efficiency of underground construction was introduced. Methods: The radon concentrations before and after shielding operation were determined, and according to the regularity of radon decay, the shielding rate can be calculated. Results: The results showed that radon shielding rate in underground construction remains generally stable with variation of time, and the actual relatively standard deviation was 3.95%. So the rapid determination and evaluation of radon preventing effect under special conditions in underground construction can be realized by taking shielding rate in a short time for the final shielding rate. Compared with those by the local static method in ground lab, the results were similar. Conclusion: This paper provided a prompt, accurate and practicable way for the evaluation of radon prevention in underground construction, having a certain reference value. (authors)

  2. Permanent Closure of MFC Biodiesel Underground Storage Tank 99ANL00013

    Energy Technology Data Exchange (ETDEWEB)

    Kerry L. Nisson

    2012-10-01

    This closure package documents the site assessment and permanent closure of the Materials and Fuels Complex biodiesel underground storage tank 99ANL00013 in accordance with the regulatory requirements established in 40 CFR 280.71, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.”

  3. Reflection Phenomena in Underground Pumped Storage Reservoirs

    Directory of Open Access Journals (Sweden)

    Elena Pummer

    2018-04-01

    Full Text Available Energy storage through hydropower leads to free surface water waves in the connected reservoirs. The reason for this is the movement of water between reservoirs at different elevations, which is necessary for electrical energy storage. Currently, the expansion of renewable energies requires the development of fast and flexible energy storage systems, of which classical pumped storage plants are the only technically proven and cost-effective technology and are the most used. Instead of classical pumped storage plants, where reservoirs are located on the surface, underground pumped storage plants with subsurface reservoirs could be an alternative. They are independent of topography and have a low surface area requirement. This can be a great advantage for energy storage expansion in case of environmental issues, residents’ concerns and an unusable terrain surface. However, the reservoirs of underground pumped storage plants differ in design from classical ones for stability and space reasons. The hydraulic design is essential to ensure their satisfactory hydraulic performance. The paper presents a hybrid model study, which is defined here as a combination of physical and numerical modelling to use the advantages and to compensate for the disadvantages of the respective methods. It shows the analysis of waves in ventilated underground reservoir systems with a great length to height ratio, considering new operational aspects from energy supply systems with a great percentage of renewable energies. The multifaceted and narrow design of the reservoirs leads to complex free surface flows; for example, undular and breaking bores arise. The results show excessive wave heights through wave reflections, caused by the impermeable reservoir boundaries. Hence, their knowledge is essential for a successful operational and constructive design of the reservoirs.

  4. Silicon subsystem mechanical engineering closeout report for the Solenoidal Detector Collaboration

    Science.gov (United States)

    Hanlon, J.; Christensen, R. W.; Hayman, G.; Jones, D. C.; Ross, R.; Wilds, W.; Yeamans, S.; Ziock, H. J.

    The authors' group at Los Alamos National Laboratory was responsible for the mechanical engineering of the silicon tracking system of the Solenoidal Detector Collaboration (SDC) experiment of the Superconducting Super Collider (SSC) project. The responsibility included the overall design of the system from the mechanical point of view, development and integration of the cooling system, which was required to remove the heat generated by the front-end electronics, assembly of the system to extremely tight tolerances, and verification that the construction and operational stability and alignment tolerances would be met. In addition to the mechanical engineering work, they also performed activation, background, and shielding studies for the SSC program. Much of the work they performed was potentially useful for other future high energy physics (HEP) projects. This report describes the closeout work that was performed for the Los Alamos SDC project. Four major tasks were identified for completion: (1) integration of the semi-automated assembly station being developed and construction of a precision part to demonstrate solutions to important general assembly problems (the station was designed to build precision silicon tracker subassemblies); (2) build a state-of-the-art TV holography (TVH) system to use for detector assembly stability tests; (3) design, build, and test a water based cooling system for a full silicon shell prototype; and (4) complete and document the activation, background, and shielding studies, which is covered in a separate report.

  5. Experimental study of a laser-heated solenoid

    International Nuclear Information System (INIS)

    Rutkowski, H.L.

    1975-01-01

    An experimental investigation was made of the interaction of an intense CO 2 laser beam with a column of initially uv-ionized hydrogen immersed in a steady magnetic field of up to 100 kG. Under the intense laser radiation, the gas becomes ionized and heated to temperatures as high as 150 eV (1.6 x 10 6 0 K). The primary purpose of the investigation was to determine the properties of the dense, hot plasma formed in this manner. Time and space resolved measurements of the plasma electron density were made using holographic interferometry along the axis and Mach--Zehnder interferometry across the column. The temperature was determined by measuring the decay rate of a line from CV in the quartz uv. These measurements were supplemented by streak photography to provide data on the development of the luminosity of the plasma column, radially and axially, as a function of time. From these various diagnostic techniques, it was possible to determine that a density minimum is formed on-axis within a few tens of nanoseconds after initiation of the laser pulse. This effectively produces a light pipe which traps the beam, and suggests that long columns can be formed by laser irradiation. The beam energy was efficiently absorbed and plasma loss rates appeared to be those expected from classical MHD modelling. While a completely unambiguous answer as to the mode of laser discharge propagation occurring in the experiment was not obtained, the bulk of the evidence suggests a ''bleaching wave'' rather than a laser driven detonator. In summary, the experiment was successful in demonstrating the creation of dense, slender columns by laser breakdown, in support of the ''laser-heated solenoid'' fusion concept

  6. Underground Nuclear Astrophysics in China

    Science.gov (United States)

    Liu, Weiping

    2016-10-01

    Underground Nuclear Astrophysics in China (JUNA) will take the advantage of the ultra-low background in Jinping underground lab. High current accelerator with an ECR source and detectors will be set up. We plan to study directly a number of nuclear reactions important to hydrostatic stellar evolution at their relevant stellar energies, such as 25Mg(p,γ)26Al, 19F(p,α)16O, 13C(α,n)16O and 12C(α,γ)16O.

  7. Dynamic Underground Stripping Demonstration Project

    International Nuclear Information System (INIS)

    Aines, R.; Newmark, R.; McConachie, W.; Rice, D.; Ramirez, A.; Siegel, W.; Buettner, M.; Daily, W.; Krauter, P.; Folsom, E.; Boegel, A.J.; Bishop, D.; udel, K.

    1992-03-01

    LLNL is collaborating with the UC Berkeley College of Engineering to develop and demonstrate a system of thermal remediation and underground imaging techniques for use in rapid cleanup of localized underground spills. Called ''Dynamic Stripping'' to reflect the rapid and controllable nature of the process, it will combine steam injection, direct electrical heating, and tomographic geophysical imaging in a cleanup of the LLNL gasoline spill. In the first 8 months of the project, a Clean Site engineering test was conducted to prove the field application of the techniques before moving to the contaminated site in FY 92

  8. Logistics background study: underground mining

    Energy Technology Data Exchange (ETDEWEB)

    Hanslovan, J. J.; Visovsky, R. G.

    1982-02-01

    Logistical functions that are normally associated with US underground coal mining are investigated and analyzed. These functions imply all activities and services that support the producing sections of the mine. The report provides a better understanding of how these functions impact coal production in terms of time, cost, and safety. Major underground logistics activities are analyzed and include: transportation and personnel, supplies and equipment; transportation of coal and rock; electrical distribution and communications systems; water handling; hydraulics; and ventilation systems. Recommended areas for future research are identified and prioritized.

  9. An Underground Storage Tank Integrated Demonstration report

    International Nuclear Information System (INIS)

    Quadrel, M.J.; Hunter, V.L.; Young, J.K.; Lini, D.C.; Goldberg, C.

    1993-04-01

    The Waste Characterization Data and Technology Development Needs Assessment provides direct support to the Underground Storage Tank Integrated Demonstration (UST-ID). Key users of the study's products may also include individuals and programs within the US Department of Energy (DOE) Office of Technology Development (EM-50), the Office of Waste Operations (EM-30), and the Office of Environmental Restoration (EM-40). The goal of this work is to provide the UST-ID with a procedure for allocating funds across competing characterization technologies in a timely and defensible manner. It resulted in three primary products: 1. It organizes and summarizes information on underground storage tank characterization data needs. 2. It describes current technology development activity related to each need and flags areas where technology development may be beneficial. 3. It presents a decision process, with supporting software, for evaluating, prioritizing, and integrating possible technology development funding packages. The data presented in this document can be readily updated as the needs of the Waste Operations and Environmental Restoration programs mature and as new and promising technology development options emerge

  10. Effect of repository underground ventilation on emplacement drift temperature control

    International Nuclear Information System (INIS)

    Yang, H.; Sun, Y.; McKenzie, D.G.; Bhattacharyya, K.K.

    1996-01-01

    The repository advanced conceptual design (ACD) is being conducted by the Civilian Radioactive Waste Management System, Management ampersand Operating Contractor. Underground ventilation analyses during ACD have resulted in preliminary ventilation concepts and design methodologies. This paper discusses one of the recent evaluations -- effects of ventilation on emplacement drift temperature management

  11. Geomechanical aspects of underground nuclear power plant construction

    International Nuclear Information System (INIS)

    Mel'nikov, N.N.; Kaspar'yan, Eh.V.

    1992-01-01

    The complex of problems connected with design, construction, operation and decommissioning of underground NPPs is discussed. The criterion for selection of sites for the NPP main compartments and requirements for rock masses in respect to stability towards external actions are formulated. The program package for evaluation of rock geomechanical properties at the stage of NPP design is briefly described

  12. National Underground Mines Inventory

    Science.gov (United States)

    1983-10-01

    washing facilities near the mine entrance at ground level. Telephones and/or radio phones are generally placed throughout mines for communication...023 0206001 04 000 0206002 04 000 0206003 04 000 ARKANSAS LIMESTONE OPERATION 0300051 05 065 261360 GUION MINE AND MILL 0300313 05 065 254100 EL DORADO

  13. Study of a microstrip gas detector for the Compact Muon Solenoid experiment

    International Nuclear Information System (INIS)

    Clergeau, J. F.

    1997-01-01

    The micro-strip gas chambers (MSGC) were realized due to the technological advances in the field of micro-electronics. The wire of usual gas counters is replaced in these detectors by metallic stripes as a periodic sequence of electrodes (anodes and cathodes) spaced by around 200 μm. At a distance of 3 mm above the strip containing substrate, a metallic plane is placed, thus defining the gaseous room where the passage of a charged particle produces by ionization a primary electron signal collected by the detector anodes. Due to its granularity a MSGC can operate under very high particle fluxes since charge can be collected very rapidly. Also, the impact parameters can be determined with high accuracy due to the high space and time resolutions. The Compact Muon Solenoid (CMS) or the MSGC detectors planned to equip one of the experiments proposed for LHC should detect, in extreme operational conditions, the particle impacts in a 4 Tesla magnetic field, for around ten years and for a particle flux of around 10 4 Hz/mm 2 . The CMS detector is described in chapter 2. The operation principle and the problems encountered in the development of MSGC detectors are summarized in chapter 3. The chapter 4 is dedicated to the study of the performances of MSGCs in magnetic fields. In the chapters 5 to 7 the processing of the signal from detectors of this type is described, particularly, the performances of various ways of treat the signal in terms of detection efficiency and counting loads are presented.The chapter 8 presents the results obtained with the prototype obtained at IPNL while the chapter 9 gives the conclusions of the performed works. (author)

  14. Earthquake damage to underground facilities

    International Nuclear Information System (INIS)

    Pratt, H.R.; Stephenson, D.E.; Zandt, G.; Bouchon, M.; Hustrulid, W.A.

    1980-01-01

    In order to assess the seismic risk for an underground facility, a data base was established and analyzed to evaluate the potential for seismic disturbance. Substantial damage to underground facilities is usually the result of displacements primarily along pre-existing faults and fractures, or at the surface entrance to these facilities. Evidence of this comes from both earthquakes and large explosions. Therefore, the displacement due to earthquakes as a function of depth is important in the evaluation of the hazard to underground facilities. To evaluate potential displacements due to seismic effects of block motions along pre-existing or induced fractures, the displacement fields surrounding two types of faults were investigated. Analytical models were used to determine relative displacements of shafts and near-surface displacement of large rock masses. Numerical methods were used to determine the displacement fields associated with pure strike-slip and vertical normal faults. Results are presented as displacements for various fault lengths as a function of depth and distance. This provides input to determine potential displacements in terms of depth and distance for underground facilities, important for assessing potential sites and design parameters

  15. Uranium extraction from underground deposits

    International Nuclear Information System (INIS)

    Wolfe, C.R.

    1982-01-01

    Uranium is extracted from underground deposits by passing an aqueous oxidizing solution of carbon dioxide over the ore in the presence of calcium ions. Complex uranium carbonate or bicarbonate ions are formed which enter the solution. The solution is forced to the surface and the uranium removed from it

  16. Status and prospects of a deep underground laboratory in China

    International Nuclear Information System (INIS)

    Kang, K J; Cheng, J P; Li, Y J; Yue, Q; Chen, Y H; Shen, M B; Wu, S Y

    2010-01-01

    An excellent candidate location for a deep underground laboratory with more than 2500 m of rock overburden has been identified at Sichuan Province in China. It can be accessed through a road tunnel of length 17.5 km, and is supported by services and amenities near the entrance provided by the local Ertan Hydropower Plant. The particle physics community in China is actively pursuing the construction of an underground laboratory at this location, under the leadership of Tsinghua University. Memorandum has been signed with Ertan Hydropower Plant which permits access to and construction of the underground laboratory - China JinPing Deep Underground Laboratory (CJPL). The basic features of this underground site, as well as the status and schedules of the construction of the first laboratory cavern are presented. The immediate goal is to have the first experiment operational in 2010, deploying an Ultra-Low-Energy Germanium detector for WIMP dark matter searches, with emphasis on the mass range of 1-10 GeV. The conceptual design of the experiment, as well as the future plans and prospects of the laboratory, will be surveyed.

  17. THE GENERATING AND COMPLEMENTARY EFFECTS OF THE UNDERGROUND ECONOMY PHENOMENON

    Directory of Open Access Journals (Sweden)

    Corneliu Sorin BAICU

    2016-12-01

    Full Text Available For a comprehensive understanding of the informal sector, an analysis addressing the relationships and links between the morphology and etiology of the underground economy, on the one hand, and its effects on the economic, social or legal, on the other hand is required. The double identity, that of cause phenomenon and effect phenomenon, that the underground economy has, gives it a special status in explaining certain phenomena which vitiates the economic and social life. The generating and complementary effects of the underground area covered in this study are analyzed in terms of the following vectors of analysis: tax evasion, illegal work and money laundering. Tax evasion represents the central core of the underground economy and faithfully expresses the fiscal monetary policies ,the fiscal mortality and the degree of compliance of the taxpayer. Undeclared work is an indicator of the labor market in the informal economy and is a good barometer for analyzing the demand and supply of labor in the visible economy. Money laundering defines the level of economic and financial crime and reflects the level of illegal use of capital on the black market. Tax evasion, money laundering and illegal work can only develop on a framework provided by illicit markets for goods, services and labor. Beyond the, unidirectional or bidirectional relationships between phenomena, the paper consists in a plea for an interdependent, multi-causal analysis of the phenomena and operating mechanisms of the relationships within and outside the underground economy.

  18. Performance of underground coal mines during the 1976 Tangshan earthquake

    Energy Technology Data Exchange (ETDEWEB)

    Lee, C.F.

    1987-01-01

    The Tangshan earthquake of 1976 costs 242 000 lives and was responsible for 164 000 serious injuries and structural damage of immense proportion. The area has eight coal mines, which together form the largest underground coal mining operation in China. Approximately 10 000 miners were working underground at the time of the earthquake. With few exceptions they survived and returned safely to the surface, only to find their families and belongings largely destroyed. Based on a comprehensive survey of the miners' observations, subsurface intensity profiles were drawn up. The profiles clearly indicated that seismic damage in the underground mines was far less severe than at the surface. 16 refs., 4 figs., 2 tabs.

  19. Manufacture and Test of a Small Ceramic-Insulated Nb$_{3}$Sn Split Solenoid

    CERN Document Server

    Bordini, B; Rossi, L; Tommasini, D

    2008-01-01

    A small split solenoid wound with high-Jc Nb3Sn conductor, constituted by a 0.8 mm Rod Re-stack Process (RRP®) strand, was built and tested at CERN in order to study the applicability of: 1) ceramic wet glass braid insulation without epoxy impregnation of the magnet; 2) a new heat treatment devised at CERN and particularly suitable for reacting RRP® Nb3Sn strands. This paper briefly describes the solenoid and the experimental results obtained during 4.4 K and 1.9 K tests. The split solenoid consists of two coils (25 mm inner diameter, 51.1 mm outer diameter, 12.9 mm height). The coils were initially separately tested, in an iron mirror configuration, and then tested together in split solenoid configuration. In all the tests at 4.4 K the coils reached a current higher than 95 % of their short sample limits at the first quench; in split solenoid configuration the maximum field values in the coils and in the aperture were respectively 10.7 T and 12.5 T. At 1.9 K the coils had premature quenches due to self fi...

  20. Limits on the field of ohmic heating solenoids, applied to a tokamak TNS

    International Nuclear Information System (INIS)

    Turner, L.R.

    1978-01-01

    If the ohmic heating solenoid for the TNS or other large tokamak is an ungraded cryostable superconducting solenoid, with NbTi at 4.2 K as the superconductor, then the smallest outer diameter is not achieved at the highest attainable field. There is a lower optimum field which minimizes the outer diameter for a given volt-second requirement. At higher fields the mean diameter decreases; but the high fields require more superconductor, more copper stabilizer, more stainless steel for support, and more liquid helium coolant. For the GA-ANL design for TNS, the optimum field is 7.55 T and the minimum outside diameter for the solenoid is 2.15 m. If, on the other hand, the solenoid is graded, with more NbTi, copper, and stainless steel on the inner turns where the field is higher, then the volt-seconds can always be increased, for a given outer diameter, by adding more turns at a higher field inside until either the critical field is reached or the solenoid bore is filled. However, the material and money required to add a few more volt-seconds increases rapidly with field

  1. Increasing the reliability of solution exchanges by monitoring solenoid valve actuation.

    Science.gov (United States)

    Auzmendi, Jerónimo Andrés; Moffatt, Luciano

    2010-01-15

    Solenoid valves are a core component of most solution perfusion systems used in neuroscience research. As they open and close, they control the flow of solution through each perfusion line, thereby modulating the timing and sequence of chemical stimulation. The valves feature a ferromagnetic plunger that moves due to the magnetization of the solenoid and returns to its initial position with the aid of a spring. The delays between the time of voltage application or removal and the actual opening or closing of the valve are difficult to predict beforehand and have to be measured experimentally. Here we propose a simple method for monitoring whether and when the solenoid valve opens and closes. The proposed method detects the movement of the plunger as it generates a measurable signal on the solenoid that surrounds it. Using this plunger signal, we detected the opening and closing of diaphragm and pinch solenoid valves with a systematic error of less than 2ms. After this systematic error is subtracted, the trial-to-trial error was below 0.2ms.

  2. Detecting Solenoid Valve Deterioration in In-Use Electronic Diesel Fuel Injection Control Systems

    Directory of Open Access Journals (Sweden)

    Chyuan-Yow Tseng

    2010-07-01

    Full Text Available The diesel engine is the main power source for most agricultural vehicles. The control of diesel engine emissions is an important global issue. Fuel injection control systems directly affect fuel efficiency and emissions of diesel engines. Deterioration faults, such as rack deformation, solenoid valve failure, and rack-travel sensor malfunction, are possibly in the fuel injection module of electronic diesel control (EDC systems. Among these faults, solenoid valve failure is most likely to occur for in-use diesel engines. According to the previous studies, this failure is a result of the wear of the plunger and sleeve, based on a long period of usage, lubricant degradation, or engine overheating. Due to the difficulty in identifying solenoid valve deterioration, this study focuses on developing a sensor identification algorithm that can clearly classify the usability of the solenoid valve, without disassembling the fuel pump of an EDC system for in-use agricultural vehicles. A diagnostic algorithm is proposed, including a feedback controller, a parameter identifier, a linear variable differential transformer (LVDT sensor, and a neural network classifier. Experimental results show that the proposed algorithm can accurately identify the usability of solenoid valves.

  3. Detecting solenoid valve deterioration in in-use electronic diesel fuel injection control systems.

    Science.gov (United States)

    Tsai, Hsun-Heng; Tseng, Chyuan-Yow

    2010-01-01

    The diesel engine is the main power source for most agricultural vehicles. The control of diesel engine emissions is an important global issue. Fuel injection control systems directly affect fuel efficiency and emissions of diesel engines. Deterioration faults, such as rack deformation, solenoid valve failure, and rack-travel sensor malfunction, are possibly in the fuel injection module of electronic diesel control (EDC) systems. Among these faults, solenoid valve failure is most likely to occur for in-use diesel engines. According to the previous studies, this failure is a result of the wear of the plunger and sleeve, based on a long period of usage, lubricant degradation, or engine overheating. Due to the difficulty in identifying solenoid valve deterioration, this study focuses on developing a sensor identification algorithm that can clearly classify the usability of the solenoid valve, without disassembling the fuel pump of an EDC system for in-use agricultural vehicles. A diagnostic algorithm is proposed, including a feedback controller, a parameter identifier, a linear variable differential transformer (LVDT) sensor, and a neural network classifier. Experimental results show that the proposed algorithm can accurately identify the usability of solenoid valves.

  4. 29 CFR 1926.800 - Underground construction.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Underground Construction, Caissons, Cofferdams and..., floor or walls in any underground work area for more than a 24-hour period; or (ii) The history of the... inches (304.8 mm) ±0.25 inch (6.35 mm) from the roof, face, floor or walls in any underground work area...

  5. Novel MEMS-based fabrication technology of micro solenoid-type inductor

    International Nuclear Information System (INIS)

    Uchiyama, S; Yang, Z Q; Takagi, H; Itoh, T; Maeda, R; Zhang, Y; Toda, A; Hayase, M

    2013-01-01

    Solenoid configuration of micro inductor, which has advantages of high quality factor and low loss, is needed in micro energy and power electronics applications but it is difficult to prepare using conventional microfabrication processes. In this work, we present a new microelectromechanical systems-based technology of micro solenoid-type inductor by a newly developed cylindrical projection photolithography method. Direct electroplating process of copper film on coil patterns was also successfully developed for achieving thick windings so that thick photoresist-based electroplating molds are not needed. Micro solenoid-type inductor prototypes of the winding pitch of about 40 µm, the winding number of 20 and 50, and the winding thickness of about 14 µm, were successfully fabricated on a 1 mm diameter glass capillary. The prepared 20-turn and 50-turn micro inductors were of inductance of 69 and 205 nH at 30 MHz, respectively. (paper)

  6. A feasibility study of a linear laser heated solenoid fusion reactor. Final report

    International Nuclear Information System (INIS)

    Steinhauer, L.C.

    1976-02-01

    This report examines the feasibility of a laser heated solenoid as a fusion or fusion-fission reactor system. The objective of this study, was an assessment of the laser heated solenoid reactor concept in terms of its plasma physics, engineering design, and commercial feasibility. Within the study many pertinent reactor aspects were treated including: physics of the laser-plasma interaction; thermonuclear behavior of a slender plasma column; end-losses under reactor conditions; design of a modular first wall, a hybrid (both superconducting and normal) magnet, a large CO 2 laser system; reactor blanket; electrical storage elements; neutronics; radiation damage, and tritium processing. Self-consistent reactor configurations were developed for both pure fusion and fusion-fission designs, with the latter designed both to produce power and/or fissile fuels for conventional fission reactors. Appendix A is a bibliography with commentary of theoretical and experimental studies that have been directed at the laser heated solenoid

  7. Behavior of moving plasma in solenoidal magnetic field in a laser ion source

    Science.gov (United States)

    Ikeda, S.; Takahashi, K.; Okamura, M.; Horioka, K.

    2016-02-01

    In a laser ion source, a solenoidal magnetic field is useful to guide the plasma and to control the extracted beam current. However, the behavior of the plasma drifting in the magnetic field has not been well understood. Therefore, to investigate the behavior, we measured the plasma ion current and the total charge within a single pulse in the solenoid by changing the distance from the entrance of the solenoid to a detector. We observed that the decrease of the total charge along the distance became smaller as the magnetic field became larger and then the charge became almost constant with a certain magnetic flux density. The results indicate that the transverse spreading speed of the plasma decreased with increasing the field and the plasma was confined transversely with the magnetic flux density. We found that the reason of the confinement was not magnetization of ions but an influence induced by electrons.

  8. GigaGauss solenoidal magnetic field inside bubbles excited in under-dense plasma

    Science.gov (United States)

    Lécz, Zs.; Konoplev, I. V.; Seryi, A.; Andreev, A.

    2016-10-01

    This paper proposes a novel and effective method for generating GigaGauss level, solenoidal quasi-static magnetic fields in under-dense plasma using screw-shaped high intensity laser pulses. This method produces large solenoidal fields that move with the driving laser pulse and are collinear with the accelerated electrons. This is in contrast with already known techniques which rely on interactions with over-dense or solid targets and generates radial or toroidal magnetic field localized at the stationary target. The solenoidal field is quasi-stationary in the reference frame of the laser pulse and can be used for guiding electron beams. It can also provide synchrotron radiation beam emittance cooling for laser-plasma accelerated electron and positron beams, opening up novel opportunities for designs of the light sources, free electron lasers, and high energy colliders based on laser plasma acceleration.

  9. Behavior of moving plasma in solenoidal magnetic field in a laser ion source

    International Nuclear Information System (INIS)

    Ikeda, S.; Takahashi, K.; Okamura, M.; Horioka, K.

    2016-01-01

    In a laser ion source, a solenoidal magnetic field is useful to guide the plasma and to control the extracted beam current. However, the behavior of the plasma drifting in the magnetic field has not been well understood. Therefore, to investigate the behavior, we measured the plasma ion current and the total charge within a single pulse in the solenoid by changing the distance from the entrance of the solenoid to a detector. We observed that the decrease of the total charge along the distance became smaller as the magnetic field became larger and then the charge became almost constant with a certain magnetic flux density. The results indicate that the transverse spreading speed of the plasma decreased with increasing the field and the plasma was confined transversely with the magnetic flux density. We found that the reason of the confinement was not magnetization of ions but an influence induced by electrons

  10. The SISSI project: An intense secondary ion source using superconducting solenoid lenses

    International Nuclear Information System (INIS)

    Joubert, A.; Baron, E.; Grunberg, C.; Mittig, W.; Ripouteau, F.; Larson, J.D.

    1991-01-01

    Secondary beams are routinely produced at GANIL for experiments from a target placed in the high energy beam line of the accelerator. In order to make a better use of the higher beam intensities soon available at GANIL, a proposal called 'SISSI' was presented in 1989. This project is now funded. It consists of a set of two superconducting solenoid lenses of very short focal length (.6m). The first solenoid is used to sharply focus the incoming beam on a fast moving target. The second increases the angular acceptance of the beam line downstream the target for charged reaction products. Calculations show that from a .4mm diameter beam spot on the target, an acceptance angle of up to 80 mrad will be reached without significant emittance growth due to aberration effects. Technical aspects of that project are then presented concerning both the solenoids and the cryogenic devices as well as the solid target

  11. Magnetic precision alignment of a long horizontal ultra-straight solenoid

    International Nuclear Information System (INIS)

    Stockli, M.P.; Cocke, C.L.; Good, J.A.; Wilkins, P.

    1989-01-01

    We present a magnetic alignment method for long horizontal ultra-straight solenoids based on the rotating Hall probe technique. We demonstrate how the sag can be eliminated, which otherwise would cause serious alignment errors. Only a flat Hall probe with a 4 1/2 digit controller and two standard ball-bearings are needed, which makes our method very inexpensive. It requires a position accuracy which can be easily achieved with a ruler and an angular precision which can be eyeballed. We give detailed instructions for our simple, straightforward method which allows one to align a solenoid very accurately in lees than one hour. Our analysis and our results indicate that our solenoid is aligned within two-hundredths of a millimeter

  12. Dynamic analysis of fast-acting solenoid valves using finite element method

    International Nuclear Information System (INIS)

    Kwon, Ki Tae; Han, Hwa Taik

    2001-01-01

    It is intended to develop an algorithm for dynamic simulation of fast-acting solenoid valves. The coupled equations of the electric, magnetic, and mechanical systems should be solved simultaneously in a transient nonlinear manner. The transient nonlinear electromagnetic field is analyzed by the Finite Element Method (FEM), which is coupled with nonlinear electronic circuitry. The dynamic movement of the solenoid valve is analyzed at every time step from the force balances acting on the plunger, which include the electromagnetic force calculated from the finite element analysis as well as the elastic force by a spring and the hydrodynamic pressure force along the flow passage. Dynamic responses of the solenoid valves predicted by this algorithm agree well the experimental results including bouncing effects

  13. Innovation application to underground mining; Innovacion aplicada a la explotacion de canteras

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    In this article is presented the pilot test initiated in the quarry of limestone aggregated located in Apario (Bilbao, Spain), in order to prolong its operating life by means of the application of the methods of the underground mining. (Author)

  14. Eves government invests $9.3 million to establish new facility for underground science in Sudbury

    CERN Multimedia

    2003-01-01

    The Sudbury Neutrino Observatory Institute (SNO), in co-operation with a number of private and public sector partners, will establish the International Facility for Underground Science at Creighton Mine in Sudbury (1 page)

  15. Sanford Underground Research Facility - The United State's Deep Underground Research Facility

    Science.gov (United States)

    Vardiman, D.

    2012-12-01

    The 2.5 km deep Sanford Underground Research Facility (SURF) is managed by the South Dakota Science and Technology Authority (SDSTA) at the former Homestake Mine site in Lead, South Dakota. The US Department of Energy currently supports the development of the facility using a phased approach for underground deployment of experiments as they obtain an advanced design stage. The geology of the Sanford Laboratory site has been studied during the 125 years of operations at the Homestake Mine and more recently as part of the preliminary geotechnical site investigations for the NSF's Deep Underground Science and Engineering Laboratory project. The overall geology at DUSEL is a well-defined stratigraphic sequence of schist and phyllites. The three major Proterozoic units encountered in the underground consist of interbedded schist, metasediments, and amphibolite schist which are crosscut by Tertiary rhyolite dikes. Preliminary geotechnical site investigations included drift mapping, borehole drilling, borehole televiewing, in-situ stress analysis, laboratory analysis of core, mapping and laser scanning of new excavations, modeling and analysis of all geotechnical information. The investigation was focused upon the determination if the proposed site rock mass could support the world's largest (66 meter diameter) deep underground excavation. While the DUSEL project has subsequently been significantly modified, these data are still available to provide a baseline of the ground conditions which may be judiciously extrapolated throughout the entire Proterozoic rock assemblage for future excavations. Recommendations for facility instrumentation and monitoring were included in the preliminary design of the DUSEL project design and include; single and multiple point extensometers, tape extensometers and convergence measurements (pins), load cells and pressure cells, smart cables, inclinometers/Tiltmeters, Piezometers, thermistors, seismographs and accelerometers, scanners (laser

  16. Underground railway environment in the UK. Pt. 2: investigation of heat load

    Energy Technology Data Exchange (ETDEWEB)

    Ampofo, F.; Maidment, G.; Missenden, J. [London South Bank University, London (United Kingdom). Faculty of Engineering

    2004-04-01

    Underground railway systems can generate enough heat from their operations to raise tunnel and station temperatures substantially. This may result in passenger discomfort in warm weather conditions if the underground railway environment is not cooled. This part of the paper investigates the heat load in a generic underground railway network using a purposely-developed mathematical model. A theoretical analysis has shown that the major contributor of heat to the tunnel is from the braking mechanism and that for the train carriage is from the passengers. The model has shown that additional cooling to the existing rolling stock may be provided by cooling the tunnels within which they operate. (author)

  17. Underground Coal Preparation System and Applications

    Science.gov (United States)

    Wei, Cao; DeYong, Shang; BaoNing, Zhang

    2018-03-01

    The underground coal preparation is a cutting-edge technology of the coal industry worldwide. This paper introduced the meaning of implementing the underground coal preparation, and the practical applications of underground mechanical moving screen jig, underground heavy medium shallow slot and underground air jigger. Through analyzing the main separation equipment and the advantages and disadvantages of three primary processes from aspects of process complexity, slime water treatment, raw coal preparation, etc., the difference among technology investment, construction scale, production cost and economic benefit is concluded.

  18. Underground storage of heat

    International Nuclear Information System (INIS)

    Despois, J.; Nougarede, F.

    1976-01-01

    The interest laying in heat storage is envisaged taking account of the new energy context, with a view to optimizing the use of production means of heat sources hardly modulated according to the demand. In such a way, a natural medium, without any constructions cost but only an access cost is to be used. So, porous and permeable rocky strata allowing the use of a pressurized water flow as a transfer fluid are well convenient. With such a choice high temperatures (200 deg C) may be obtained, that are suitable for long transmissions. A mathematical model intended for solving the conservation equations in the case of heat storage inside a confined water layer is discussed. An approach of the operating conditions of storage may involve either a line-up arrangement (with the hot drilling at the center, the cold drillings being aligned on both sides) or a radial arrangement (with cold drillings at the peripheral edge encircling the hot drilling at the center of the layer). The three principal problems encountered are: starting drilling, and the circuit insulation and control [fr

  19. Laser ion source with solenoid for Brookhaven National Laboratory-electron beam ion source.

    Science.gov (United States)

    Kondo, K; Yamamoto, T; Sekine, M; Okamura, M

    2012-02-01

    The electron beam ion source (EBIS) preinjector at Brookhaven National Laboratory (BNL) is a new heavy ion-preinjector for relativistic heavy ion collider (RHIC) and NASA Space Radiation Laboratory (NSRL). Laser ion source (LIS) is a primary ion source provider for the BNL-EBIS. LIS with solenoid at the plasma drift section can realize the low peak current (∼100 μA) with high charge (∼10 nC) which is the BNL-EBIS requirement. The gap between two solenoids does not cause serious plasma current decay, which helps us to make up the BNL-EBIS beamline.

  20. Laser ion source with solenoid for Brookhaven National Laboratory-electron beam ion source

    International Nuclear Information System (INIS)

    Kondo, K.; Okamura, M.; Yamamoto, T.; Sekine, M.

    2012-01-01

    The electron beam ion source (EBIS) preinjector at Brookhaven National Laboratory (BNL) is a new heavy ion-preinjector for relativistic heavy ion collider (RHIC) and NASA Space Radiation Laboratory (NSRL). Laser ion source (LIS) is a primary ion source provider for the BNL-EBIS. LIS with solenoid at the plasma drift section can realize the low peak current (∼100 μA) with high charge (∼10 nC) which is the BNL-EBIS requirement. The gap between two solenoids does not cause serious plasma current decay, which helps us to make up the BNL-EBIS beamline.

  1. CO2-laser--produced plasma columns in a solenoidal magnetic field

    International Nuclear Information System (INIS)

    Offenberger, A.A.; Cervenan, M.R.; Smy, P.R.

    1976-01-01

    A 1-GW CO 2 laser pulse has been used to produce extended column breakdown of hydrogen at low pressure in a 20-cm-long solenoid. Magnetic fields of up to 110 kG were used to inhibit radial losses of the plasma column. A differential pumping scheme was devised to prevent formation of an opaque absorption wave travelling out of the solenoid back toward the focusing lens. Target burns give direct evidence for trapped laser beam propagation along the plasma column

  2. Development of solenoid-induced helical wiggler with four poles per period

    International Nuclear Information System (INIS)

    Ohigashi, N.; Tsunawaki, Y.; Kiyochi, M.; Nakao, N.; Fujita, M.; Imasaki, K.; Nakai, S.; Mima, K.

    1999-01-01

    A new type of helical wiggler consisting of two staggered-iron arrays inserted into a solenoid field has been developed. The field measured by a test wiggler showed linear increment with the period. It was seen that 24% of the solenoid field contributed to the induced wiggler field when the gap length and the period of the wiggler were 16 and 24 mm, respectively. This wiggler would be useful for an FEL with a low-energy electron beam propagating in a strong axial guiding field

  3. Development of solenoid-induced helical wiggler with four poles per period

    CERN Document Server

    Ohigashi, N; Kiyochi, M; Nakao, N; Fujita, M; Imasaki, K; Nakai, S; Mima, K

    1999-01-01

    A new type of helical wiggler consisting of two staggered-iron arrays inserted into a solenoid field has been developed. The field measured by a test wiggler showed linear increment with the period. It was seen that 24% of the solenoid field contributed to the induced wiggler field when the gap length and the period of the wiggler were 16 and 24 mm, respectively. This wiggler would be useful for an FEL with a low-energy electron beam propagating in a strong axial guiding field.

  4. Conceptual design of the Mu2e production solenoid cold mass

    Energy Technology Data Exchange (ETDEWEB)

    Kashikhin, V.V.; Ambrosio, G.; Andreev, N.; Lamm, M.; Mokhov, N.V.; Nicol, T.H.; Page, T.M.; Pronskikh, V.; /Fermilab

    2011-06-01

    The Muon-to-Electron conversion experiment (Mu2e), under development at Fermilab, seeks to detect direct muon to electron conversion to provide evidence for a process violating muon and electron lepton number conservation that cannot be explained by the Standard Model of particle physics. The required magnetic field is produced by a series of superconducting solenoids of various apertures and lengths. This paper describes the conceptual design of the 5 T, 4 m long solenoid cold mass with 1.67 m bore with the emphasis on the magnetic, radiation and thermal analyses.

  5. Fabrication of a solenoid-type inductor with Fe-based soft magnetic core

    International Nuclear Information System (INIS)

    Lei Chong; Zhou Yong; Gao Xiaoyu; Ding Wen; Cao Ying; Choi, Hyung; Won, Jonghwa

    2007-01-01

    A solenoid-type inductor was fabricated by MEMS (Microelectromechanical systems) technique. The fabrication process uses UV-LIGA, dry etching, fine polishing, and electroplating technique to achieve high performance of the solenoid-type inductor. Fe-based soft magnetic thin film was sputtered as the magnetic core, and polyimide was used as the insulation materials. The inductor was in size of 4x4 mm with coil width of 20 μm and space of 35 μm. The inductance is 1.61 μH at a frequency of 5 MHz with the maximum quality factor of 1.42

  6. Electron temperature control by an external magnetic field in solenoidal inductive discharge

    International Nuclear Information System (INIS)

    Lee, Min-Hyong; Ku, Ju-Hwan; Hwang, Kwang-Tae; Chung, Chin-Wook

    2009-01-01

    Electron temperature control is performed by controlling the external magnetic field strength in a solenoidal inductive discharge. As the magnetic field strength increases, the electron temperature of the plasma bulk decreases. The temperature at the discharge center falls from 3.1 to 1.5 eV when a 52 G dc magnetic field is applied. This decrease in the temperature is accompanied by a decrease in the plasma density. The change in temperature by the magnetic field is caused by both the electron confinement and the restriction of electron transport by the magnetic field in solenoidal inductive discharge.

  7. Force characteristics of solenoid electromagnet with ferromagnetic disc in the coil

    International Nuclear Information System (INIS)

    Gueorgiev, Vultchan; Yatchev, Ivan; Alexandrov, Alexander

    2002-01-01

    The paper presents the construction and characteristics of a solenoid electromagnet with ferromagnetic disc placed in the coil. The presence if the disc leads to change of the force characteristic compared with conventional solenoid electromagnets - increasing the force at large air gaps and decreasing the force at small air gaps. This could be very useful for some actuators. It has been studied how the force characteristic depend on disc size, position and material. Finite element method has been used for field and force calculations of the electromagnet. (Author)

  8. ASME XI stroke time testing of solenoid valves at Connecticut Yankee Station

    Energy Technology Data Exchange (ETDEWEB)

    Martin, C.W.

    1996-12-01

    Connecticut Yankee Atomic Power Company has developed the capability of measuring the stroke times of AC and DC solenoid valves. This allows the station to measure the stroke time of any solenoid valve in the plant, even those valves which do not have valve stem position indicators. Connecticut Yankee has adapted the ITI MOVATS Checkmate 3 system, using a signal input from a Bruel and Kjaer (B&K) Model 4382 acoustic accelerometer and the Schaumberg Campbell Associates (SCA) Model SCA-1148 dual sensor, which is a combined accelerometer and gaussmeter.

  9. ASME XI stroke time testing of solenoid valves at Connecticut Yankee Station

    International Nuclear Information System (INIS)

    Martin, C.W.

    1996-01-01

    Connecticut Yankee Atomic Power Company has developed the capability of measuring the stroke times of AC and DC solenoid valves. This allows the station to measure the stroke time of any solenoid valve in the plant, even those valves which do not have valve stem position indicators. Connecticut Yankee has adapted the ITI MOVATS Checkmate 3 system, using a signal input from a Bruel and Kjaer (B ampersand K) Model 4382 acoustic accelerometer and the Schaumberg Campbell Associates (SCA) Model SCA-1148 dual sensor, which is a combined accelerometer and gaussmeter

  10. Underground spaces/cybernetic spaces

    Directory of Open Access Journals (Sweden)

    Tomaž Novljan

    2000-01-01

    Full Text Available A modern city space is a space where in the vertical and horizontal direction dynamic, non-linear processes exist, similar as in nature. Alongside the “common” city surface, cities have underground spaces as well that are increasingly affecting the functioning of the former. It is the space of material and cybernetic communication/transport. The psychophysical specifics of using underground places have an important role in their conceptualisation. The most evident facts being their limited volume and often limited connections to the surface and increased level of potential dangers of all kinds. An efficient mode for alleviating the effects of these specific features are artistic interventions, such as: shape, colour, lighting, all applications of the basic principles of fractal theory.

  11. Treatment of an underground formation

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, P.E.; Braden, W.B. Jr.

    1974-03-12

    A method is described for treating underground formations, especially those containing clays or clay-like materials which are sensitive to fresh water. The treatment densensitizes the clays so they will not swell or disperse on contact with fresh water. The procedure consists of contacting the clay-containing formation with solutions which accomplish the electroless deposition of metal on the clay particles. Optionally, the formation can be resin coated prior to electroless plating. (9 claims)

  12. The Underground Economy in Romania

    Directory of Open Access Journals (Sweden)

    Cleopatra Sendroiu

    2006-07-01

    Full Text Available Underground economic activities exist in most countries around the world, and they usually have the same causes: inadequate tax systems, excessive state interference in the economy and the lack of coordination in establishing economic policies. Through this paper, we aim to offer certain recommendations, which, in our opinion, would lead to solving the issue of inadequate allocation of resources and would also contribute to restoration of the worldwide economy.

  13. The stress and underground environment

    Science.gov (United States)

    Chama, A.

    2009-04-01

    Currently,the program of prevention in occupational health needs mainly to identify occupational hazards and strategy of their prevention.Among these risks,the stress represents an important psycho-social hazard in mental health,which unfortunately does not spare no occupation.My Paper attempts to highlight and to develop this hazard in its different aspects even its regulatory side in underground environment as occupational environment.In the interest of better prevention ,we consider "the information" about the impact of stress as the second prevention efficient and no expensive to speleologists,hygienists and workers in the underground areas. In this occasion of this event in Vienna,we also highlight the scientific works on the stress of the famous viennese physician and endocrinologist Doctor Hans Selye (1907-1982),nicknamed "the father of stress" and note on relation between biological rhythms in this underground area and psychological troubles (temporal isolation) (Jurgen Aschoff’s works and experiences out-of time).

  14. First ATLAS Events Recorded Underground

    CERN Multimedia

    Teuscher, R

    As reported in the CERN Bulletin, Issue No.30-31, 25 July 2005 The ATLAS barrel Tile calorimeter has recorded its first events underground using a cosmic ray trigger, as part of the detector commissioning programme. This is not a simulation! A cosmic ray muon recorded by the barrel Tile calorimeter of ATLAS on 21 June 2005 at 18:30. The calorimeter has three layers and a pointing geometry. The light trapezoids represent the energy deposited in the tiles of the calorimeter depicted as a thick disk. On the evening of June 21, the ATLAS detector, now being installed in the underground experimental hall UX15, reached an important psychological milestone: the barrel Tile calorimeter recorded the first cosmic ray events in the underground cavern. An estimated million cosmic muons enter the ATLAS cavern every 3 minutes, and the ATLAS team decided to make good use of some of them for the commissioning of the detector. Although only 8 of the 128 calorimeter slices ('superdrawers') were included in the trigg...

  15. Radionuclides in an underground environment

    International Nuclear Information System (INIS)

    Thompson, J.L.

    1996-01-01

    In the 100 years since Becquerel recognized radioactivity, mankind has been very successful in producing large amounts of radioactive materials. We have been less successful in reaching a consensus on how to dispose of the billions of curies of fission products and transuranics resulting from nuclear weapons testing, electrical power generation, medical research, and a variety of other human endeavors. Many countries, including the United States, favor underground burial as a means of disposing of radioactive wastes. There are, however, serious questions about how such buried wastes may behave in the underground environment and particularly how they might eventually contaminate water, air and soil resources on which we are dependent. This paper describes research done in the United States in the state of Nevada on the behavior of radioactive materials placed underground. During the last thirty years, a series of ''experiments'' conducted for other purposes (testing of nuclear weapons) have resulted in a wide variety of fission products and actinides being injected in rock strata both above and below the water table. Variables which seem to control the movement of these radionuclides include the physical form (occlusion versus surface deposition), the chemical oxidation state, sorption by mineral phases of the host rock, and the hydrologic properties of the medium. The information gained from these studies should be relevant to planning for remediation of nuclear facilities elsewhere in the world and for long-term storage of nuclear wastes

  16. Underground geotechnical and geological investigations at Ekati Mine-Koala North: case study

    Science.gov (United States)

    Jakubec, Jaroslav; Long, Larry; Nowicki, Tom; Dyck, Darren

    2004-09-01

    Since 1998, BHP Billiton has mined diamonds at the Ekati Diamond Mine™ near Lac de Gras in the Northwest Territories of Canada. Current operations are based on mining multiple pipes by the open-pit method, but as some pits deepen, converting to underground mining is being considered. As a test of underground mining methods and to provide access to the lower elevations of the Panda and Koala pipes, the Koala North pipe is being developed for underground mining. Initially, the top 40 m of the pipe were mined as an open pit to provide grade information and a prepared surface for the transition to underground mining. Currently, Koala North is being developed as an open-benching, mechanized, trackless operation. Although the method was successfully used at several De Beers diamond operations in South Africa, it has never been tested in an Arctic environment. This case study describes basic geology, mining method layout and ongoing geological and geotechnical investigation. From the beginning of underground development, geotechnical daily routines have been fully integrated within the technical services department, which supports the operation. Geotechnical, geological and structural information obtained from underground mapping and core logging is compiled, processed, reviewed and analyzed on site by the geotechnical staff. Conclusions and recommendations are implemented as part of the operations in a timely manner. This ongoing ;live; process enables the operators to make the most efficient use of resources both for ground support and excavations as well as to address safety issues, which are the top priority.

  17. Ground engineering principles and practices for underground coal mining

    CERN Document Server

    Galvin, J M

    2016-01-01

    This book teaches readers ground engineering principles and related mining and risk management practices associated with underground coal mining. It establishes the basic elements of risk management and the fundamental principles of ground behaviour and then applies these to the essential building blocks of any underground coal mining system, comprising excavations, pillars, and interactions between workings. Readers will also learn about types of ground support and reinforcement systems and their operating mechanisms. These elements provide the platform whereby the principles can be applied to mining practice and risk management, directed primarily to bord and pillar mining, pillar extraction, longwall mining, sub-surface and surface subsidence, and operational hazards. The text concludes by presenting the framework of risk-based ground control management systems for achieving safe workplaces and efficient mining operations. In addition, a comprehensive reference list provides additional sources of informati...

  18. ANALYSIS OF ELECTROMAGNETIC PROCESSES IN THE SYSTEM «CYLINDRICAL SOLENOID – MASSIVE CONDUCTOR»

    Directory of Open Access Journals (Sweden)

    Yu. V. Batygin

    2018-02-01

    Full Text Available Purpose. Defining the key parameters of the inductor geometry, as a long multi-turn solenoid, that influence on the current amplitude induced excited in a massive conductor with a flat boundary surface. Methodology. Performing a mathematical analysis of the electrodynamic problem solution for an area with variable structure by integrating Maxwell's equation within the given boundary and initial conditions and also physical assumptions simplifying the process of solving but not distorting the result and carrying out an experiment that confirms not only the correctly construction considered but also the acceptability of the chosen assumption the opacity applying of the metal blank for these operating fields frequencies. Results. Functional dependencies of the current induced parameters on the metal surface of the heating object have been obtained, along which numerical estimates of the electrodynamic process have been performed, and key parameters influencing the heating efficiency have been determined. The correctness of the solutions obtained was confirmed experimentally. The final form of the solution function of the physical-mathematical problem was shown to be acceptable for performing further engineering and research calculations. Originality. The functional connection of the measured values of the induced surface current and the parameters of the measuring system is determined, the experimental confirmation of which indicates the satisfactory calculation model of the induction heating system and the entire solution as a whole. Practical value. Based on the calculations performed, working samples of inductive systems for induction heating that meet the specified heating rate and area requirements can be constructed. The obtained analytical expressions were transformed and simplified for their further using for engineering calculations with a minimum error value.

  19. Radiological criteria for underground nuclear tests

    Energy Technology Data Exchange (ETDEWEB)

    Malik, J.S.; Brownlee, R.R.; Costa, C.F.; Mueller, H.F.; Newman, R.W.

    1981-04-01

    The radiological criteria for the conduct of nuclear tests have undergone many revisions with the current criteria being 0.17 rad for uncontrolled populations and 0.5 rad for controllable populations. Their effect upon operations at the Nevada Test Site and the current off-site protective plans are reviewed for areas surrounding the Site. The few accidental releases that have occurred are used to establish estimates of probability of release and of hazard to the population. These are then put into context by comparing statistical data on other accidents and cataclysms. The guidelines established by DOE Manual Chapter MC-0524 have never been exceeded during the entire underground nuclear test program. The probability of real hazard to off-site populations appears to be sufficiently low as not to cause undue concern to the citizenry.

  20. Radiological criteria for underground nuclear tests

    International Nuclear Information System (INIS)

    Malik, J.S.; Brownlee, R.R.; Costa, C.F.; Mueller, H.F.; Newman, R.W.

    1981-04-01

    The radiological criteria for the conduct of nuclear tests have undergone many revisions with the current criteria being 0.17 rad for uncontrolled populations and 0.5 rad for controllable populations. Their effect upon operations at the Nevada Test Site and the current off-site protective plans are reviewed for areas surrounding the Site. The few accidental releases that have occurred are used to establish estimates of probability of release and of hazard to the population. These are then put into context by comparing statistical data on other accidents and cataclysms. The guidelines established by DOE Manual Chapter MC-0524 have never been exceeded during the entire underground nuclear test program. The probability of real hazard to off-site populations appears to be sufficiently low as not to cause undue concern to the citizenry

  1. Evolution of solenoidal and dilatational perturbations in transitional supersonic and hypersonic boundary layers

    Science.gov (United States)

    Kamal, Omar; Hickey, Jean-Pierre; Scalo, Carlo; Hussain, Fazle

    2017-11-01

    We have investigated the interaction between the dilatational and solenoidal components of instability waves relying on DNS simulations of temporally-evolving compressible boundary layers ranging from Mach numbers of 2.0 to 10.0. For idealized flow conditions at subsonic-to-moderate supersonic speeds, transition to turbulence occurs due to amplification of Tollmien-Schlichting (T-S) waves (first Mack mode) exponentially amplified until nonlinear breakdown and transition to turbulence occurs. Under the same conditions, at hypersonic speeds, transition is governed by acoustically resonating trapped waves (second Mack mode). While the former are expected to be solenoidal in nature and the latter predominantly dilatational, we demonstrate that, in general, they always coexist and that, even at Mach=10 there is an appreciable energy transfer from the dilatational to the solenoidal at limit-cycle amplitude conditions in 2D simulations. In three-dimensional simulations very rapid breakdown is observed. Mechanisms of energy exchange between the dilatational and solenoidal components during the transition will be discussed.

  2. Experiments with a double solenoid system: Measurements of the 6He + p Resonant Scattering

    Directory of Open Access Journals (Sweden)

    Pampa Condori R.

    2014-03-01

    Full Text Available A recent experiment has been performed in the double solenoid system Radioactive Ion Beams in Brasil (RIBRAS by impinging a pure 6He secondary beam on a thick CH2 target to measure the 6He + p excitation function. Results of this experiment will be presented.

  3. The Magnetic Field inside a Long Solenoid--A New Approach

    Science.gov (United States)

    Andrews, David; Carlton, Kevin; Lisgarten, David

    2010-01-01

    This article describes a technique for measuring the magnetic field inside a long solenoid using computer data logging. This is a new approach to a standard student practical. The design and construction of the sensors is described; they significantly reduce the cost of the apparatus. The approach of the practical is for the students to…

  4. Performance of solenoids versus quadrupoles in focusing and energy selection of laser accelerated protons

    Science.gov (United States)

    Hofmann, Ingo

    2013-04-01

    Using laser accelerated protons or ions for various applications—for example in particle therapy or short-pulse radiographic diagnostics—requires an effective method of focusing and energy selection. We derive an analytical scaling for the performance of a solenoid compared with a doublet/triplet as function of the energy, which is confirmed by TRACEWIN simulations. Generally speaking, the two approaches are equivalent in focusing capability, if parameters are such that the solenoid length approximately equals its diameter. The scaling also shows that this is usually not the case above a few MeV; consequently, a solenoid needs to be pulsed or superconducting, whereas the quadrupoles can remain conventional. It is also important that the transmission of the triplet is found only 25% lower than that of the equivalent solenoid. Both systems are equally suitable for energy selection based on their chromatic effect as is shown using an initial distribution following the RPA simulation model by Yan et al. [Phys. Rev. Lett. 103, 135001 (2009PRLTAO0031-900710.1103/PhysRevLett.103.135001].

  5. Performance of solenoids versus quadrupoles in focusing and energy selection of laser accelerated protons

    Directory of Open Access Journals (Sweden)

    Ingo Hofmann

    2013-04-01

    Full Text Available Using laser accelerated protons or ions for various applications—for example in particle therapy or short-pulse radiographic diagnostics—requires an effective method of focusing and energy selection. We derive an analytical scaling for the performance of a solenoid compared with a doublet/triplet as function of the energy, which is confirmed by TRACEWIN simulations. Generally speaking, the two approaches are equivalent in focusing capability, if parameters are such that the solenoid length approximately equals its diameter. The scaling also shows that this is usually not the case above a few MeV; consequently, a solenoid needs to be pulsed or superconducting, whereas the quadrupoles can remain conventional. It is also important that the transmission of the triplet is found only 25% lower than that of the equivalent solenoid. Both systems are equally suitable for energy selection based on their chromatic effect as is shown using an initial distribution following the RPA simulation model by Yan et al. [Phys. Rev. Lett. 103, 135001 (2009PRLTAO0031-900710.1103/PhysRevLett.103.135001].

  6. Compact Muon Solenoid: largest physics experiment to be held in 2007

    CERN Multimedia

    Atkins, William

    2007-01-01

    "over the last fifteen years about 2'300 engineers and scientists from over 150 scientific institutions in 37 countries around the world have worked together to design and build a gigantic general-purpose particle detector, what is called the Compact Muon Solenoid (CMS)." (1 page)

  7. Progress on the Design and Fabrication of the MICE Spectrometer Solenoids

    International Nuclear Information System (INIS)

    Virostek, S.P.; Green, M.A.; Lia, D.; Sizman, M.S.

    2007-01-01

    The Muon Ionization Cooling Experiment (MICE) will demonstrate ionization cooling in a short section of a realistic cooling channel using a muon beam at Rutherford Appleton Laboratory (RAL) in the UK. A five-coil, superconducting spectrometer solenoid magnet at each end of the cooling channel will provide a 4 T uniform field region for the scintillating fiber tracker within the magnet bore tubes. The tracker modules are used to measure the muon beam emittance as it enters and exits the cooling channel. The cold mass for the 400 mm warm bore magnet consists of two sections: a three-coil spectrometer magnet and a two-coil matching section that matches the uniform field of the solenoid into the MICE cooling channel. The spectrometer solenoid detailed design and analysis has been completed, and the fabrication of the magnets is well under way. The primary features of the spectrometer solenoid magnet and mechanical designs are presented along with a summary of key fabrication issues and photos of the construction

  8. TESTING OF FRAMED STRUCTURE PARTS OF COMPACT MUON SOLENOID BY NONDESTRUCTIVE METHOD

    Directory of Open Access Journals (Sweden)

    L. V. Larchenkov

    2013-01-01

    Full Text Available Suspension parts of a compact muon solenoid for Large Hadron Collider have been tested in the paper. The paper describes a steady-state and cyclic “tension-compression” load created by superconducting electromagnet with energy of 3 GJ and magnetic induction of 4 tesla. A nondestructive testing method has been applied in the paper.

  9. ITER central solenoid model coil heat treatment complete and assembly started

    International Nuclear Information System (INIS)

    Thome, R.J.; Okuno, K.

    1998-01-01

    A major R and D task in the ITER program is to fabricate a Superconducting Model Coil for the Central Solenoid to establish the design and fabrication methods for ITER size coils and to demonstrate conductor performance. Completion of its components is expected in 1998, to be followed by assembly with structural components and testing in a facility at JAERI

  10. Explicit representation of roots on p-adic solenoids and non ...

    Indian Academy of Sciences (India)

    This note generalizes known results concerning the existence of roots and embedding one-parameter subgroups on -adic solenoids. An explicit representation of the roots leads to the construction of two distinct rational embedding one-parameter subgroups. The results contribute to enlighten the group structure of ...

  11. Explicit representation of roots on p-adic solenoids and non ...

    Indian Academy of Sciences (India)

    Abstract. This note generalizes known results concerning the existence of roots and embedding one-parameter subgroups on p-adic solenoids. An explicit representation of the roots leads to the construction of two distinct rational embedding one-parameter subgroups. The results contribute to enlighten the group structure ...

  12. Underground siting is a nuclear option

    International Nuclear Information System (INIS)

    Dodds, R.K.; Gilbert, P.H.

    1976-01-01

    Underground siting of nuclear power plants is a concept that can be both technologically feasible and economically attractive. To meet both these criteria, however, each underground nuclear plant must be adapted to take full advantage of its location. It cannot be a unit that was designed for the surface and is then buried. Seeking to develop potential commercial programs, Underground Design Consultants (UDC)--a joint venture of Parsons, Brinckerhoff, Quade and Douglas, New York City, Vattenbyggnadsbyran (VBB), Stockholm, Sweden, and Foundation Sciences, Inc., Portland, Oregon--has been studying the siting of nuclear plants underground. UDC has made a presentation to EPRI on the potential for underground siting in the U.S. The summary presented here is based on the experiences of underground nuclear power plants in Halden, Norway; Agesta, Sweden; Chooz, France; and Lucens, Switzerland. Data from another plant in the design phase in Sweden and UDC's own considered judgment were also used

  13. Underground test area subproject waste management plan. Revision No. 1

    International Nuclear Information System (INIS)

    1996-08-01

    The Nevada Test Site (NTS), located in southern Nevada, was the site of 928 underground nuclear tests conducted between 1951 and 1992. The tests were performed as part of the Atomic Energy Commission and U.S. Department of Energy (DOE) nuclear weapons testing program. The NTS is managed by the DOE Nevada Operations Office (DOE/NV). Of the 928 tests conducted below ground surface at the NTS, approximately 200 were detonated below the water table. As an unavoidable consequence of these testing activities, radionuclides have been introduced into the subsurface environment, impacting groundwater. In the few instances of groundwater sampling, radionuclides have been detected in the groundwater; however, only a very limited investigation of the underground test sites and associated shot cavities has been conducted to date. The Underground Test Area (UGTA) Subproject was established to fill this void and to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the NTS. One of its primary objectives is to gather data to characterize the deep aquifer underlying the NTS

  14. Development of excavation technologies at the Canadian underground research laboratory

    International Nuclear Information System (INIS)

    Kuzyk, Gregory W.; Martino, Jason B.

    2008-01-01

    Several countries, Canada being among them, are developing concepts for disposal of used fuel from power generating nuclear reactors. As in underground mining operations, the disposal facilities will require excavation of many kilometres of shafts and tunnels through the host rock mass. The need to maintain the stability of excavations and safety of workers will be of paramount importance. Also, excavations required for many radioactive waste repositories will ultimately need to be backfilled and sealed to maintain stability and minimize any potential for migration of radionuclides, should they escape their disposal containers. The method used to excavate the tunnels and shafts, and the rock damage that occurs due to excavation, will greatly affect the performance characteristics of repository sealing systems. The underground rock mechanics and geotechnical engineering work performed at the Canadian Underground Research Laboratory (URL) has led to the development of excavation technologies that reduce rock damage in subsurface excavations. This paper discusses the excavation methods used to construct the URL and their application in planning for the construction of similar underground laboratories and repositories for radioactive wastes. (author)

  15. Construction experiences from underground works at Forsmark. Compilation Report

    Energy Technology Data Exchange (ETDEWEB)

    Carlsson, Anders [Vattenfall Power Consultant AB, Stockholm (Sweden); Christiansson, Rolf [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden)

    2007-02-15

    The main objective with this report, the Construction Experience Compilation Report (CECR), is to compile experiences from the underground works carried out at Forsmark, primarily construction experiences from the tunnelling of the two cooling water tunnels of the Forsmark nuclear power units 1, 2 and 3, and from the underground excavations of the undersea repository for low and intermediate reactor waste, SFR. In addition, a brief account is given of the operational experience of the SFR on primarily rock support solutions. The authors of this report have separately participated throughout the entire construction periods of the Forsmark units and the SFR in the capacity of engineering geologists performing geotechnical mapping of the underground excavations and acted as advisors on tunnel support; Anders Carlsson participated in the construction works of the cooling water tunnels and the open cut excavations for Forsmark 1, 2 and 3 (geotechnical mapping) and the Forsmark 3 tunnel (advise on tunnel support). Rolf Christiansson participated in the underground works for the SFR (geotechnical mapping, principal investigator for various measurements and advise on tunnel support and grouting). The report is to a great extent based on earlier published material as presented in the list of references. But it stands to reason that, during the course of the work with this report, unpublished notes, diaries, drawings, photos and personal recollections of the two authors have been utilised in order to obtain such a complete compilation of the construction experiences as possible.

  16. High radon exposure in a Brazilian underground coal mine

    International Nuclear Information System (INIS)

    Veiga, L H S; Melo, V; Koifman, S; Amaral, E C S

    2004-01-01

    The main source of radiation exposure in most underground mining operations is radon and radon decay products. The situation of radon exposure in underground mining in Brazil is still unknown, since there has been no national regulation regarding this exposure. A preliminary radiological survey in non-uranium mines in Brazil indicated that an underground coal mine in the south of Brazil had high radon concentration and needed to be better evaluated. This paper intends to present an assessment of radon and radon decay product exposure in the underground environment of this coal mining industry and to estimate the annual exposure to the workers. As a product of this assessment, it was found that average radon concentrations at all sampling campaign and excavation sites were above the action level range for workplaces of 500-1500 Bq m -3 recommended by the International Commission on Radiological Protection-ICRP 65. The average effective dose estimated for the workers was almost 30 times higher than the world average dose for coal miners

  17. Radon in Brazilian underground mines.

    Science.gov (United States)

    Ayres da Silva, Anna Luiza Marques; Eston, Sérgio Médici; Iramina, Wilson Siguemasa; Francisca, Diego Diegues

    2018-02-14

    Radon is a chemically inert noble radioactive gas found in several radioactive decay chains. In underground mines, especially those that contain or have contained ores associated with uranium-bearing minerals, workers might be exposed to high levels of radon and its decay products (RDP). This work aimed to investigate whether the exposure of workers to radon gas and its progeny has been evaluated in Brazilian non-uranium and non-thorium underground mines. If so, the results and control measures undertaken or recommended to maintain the concentrations under Brazilian occupational exposure limits (OELs) were documented. The adopted methodology consisted of three main phases. The first was an extensive bibliographical survey of the concentration levels of radon and RDP, and the radiation dose estimates, considering measurements made heretofore by various Brazilian researchers and exhibiting original measurement work undertaken by the one of the authors (mine O). In the second phase, the values obtained were compared with OELs. In the third phase, it was verified whether any control measures were undertaken in the mines with high exposure of workers to radon and its progeny, and if so, the adopted controls were determined. Data of radon concentration obtained from 52 campaigns in 40 underground mines were analyzed. The results showed that the assessment of the exposure of workers to radon and its progeny was undertaken in many mines at least once, and that in 62.5% of the mines, when visited for the first time, the radon levels throughout them were below the Brazilian OELs. As expected, the main control measure adopted or recommended was the improvement of the ventilation system. © 2018 IOP Publishing Ltd.

  18. Planning geological underground repositories - Communicating with society

    International Nuclear Information System (INIS)

    Schenkel, W.; Gallego Carrera, D.; Renn, O.; Dreyer, M.

    2009-06-01

    The project 'Planning geological underground repositories: Communicating with society', financed by the Swiss Federal Office for Energy, aimed at identifying basic principles for an appropriate information and communication strategy in the process of finding an underground site to store radioactive wastes. The topic concerns an issue increasingly discussed in modern societies: How to improve the dialogue between science, infrastructure operators, public authorities, groups in civil society and the population to answer complex problems? Against this background, in the project the following questions were taken into account: (i) How can the dialogue between science, politics, economy, and the (non-)organised public be arranged appropriately? Which principles are to be considered in organising this process? How can distrust within the population be reduced and confidence in authorities and scientific expertise be increased? (ii) How can society be integrated in the process of decision-making so that this process is perceived as comprehensible, acceptable and legitimate? To answer these questions, an analysis method based on scientific theory and methodology was developed, which compares national participation and communication processes in finding underground storage sites in selected countries. Case studies have been carried out in Germany, Sweden, Belgium, and Switzerland. By using specific criteria to evaluate communication processes, the strong points as well as the drawbacks of the country-specific concepts of information, communication and participation have been analysed in a comparing dimension. By taking into account the outcomes, prototypical scenarios have been deduced that can serve as a basis for compiling a reference catalogue of measures, which is meant to support the Swiss communication strategy in the finding of an appropriate site for a nuclear waste repository. Following conclusions can be drawn from the international comparison: (i) Open and

  19. Third symposium on underground mining

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    The Third Symposium on Underground Mining was held at the Kentucky Fair and Exposition Center, Louisville, KY, October 18--20, 1977. Thirty-one papers have been entered individually into EDB and ERA. The topics covered include mining system (longwall, shortwall, room and pillar, etc.), mining equipment (continuous miners, longwall equipment, supports, roof bolters, shaft excavation equipment, monitoring and control systems. Maintenance and rebuilding facilities, lighting systems, etc.), ventilation, noise abatement, economics, accidents (cost), dust control and on-line computer systems. (LTN)

  20. A Critical Study on the Underground Environment of Coal Mines in India-an Ergonomic Approach

    Science.gov (United States)

    Dey, Netai Chandra; Sharma, Gourab Dhara

    2013-04-01

    Ergonomics application on underground miner's health plays a great role in controlling the efficiency of miners. The job stress in underground mine is still physically demanding and continuous stress due to certain posture or movement of miners during work leads to localized muscle fatigue creating musculo-skeletal disorders. A good working environment can change the degree of job heaviness and thermal stress (WBGT values) can directly have the effect on stretch of work of miners. Out of many unit operations in underground mine, roof bolting keeps an important contribution with regard to safety of the mine and miners. Occupational stress of roof bolters from ergonomic consideration has been discussed in the paper.

  1. Underground storage of natural gas in Italy

    International Nuclear Information System (INIS)

    Henking, E.

    1992-01-01

    After first relating the importance of natural gas storage to the viability of Italian industrial activities, this paper discusses the geo-physical nature of different types of underground cavities which can be used for natural gas storage. These include depleted petroleum and natural gas reservoirs, aquifers and abandoned mines. Attention is given to the geologic characteristics and physical characteristics such as porosity, permeability and pressure that determine the suitability of any given storage area, and to the techniques used to resolve problems relative to partially depleted reservoirs, e.g., the presence of oil, water and salt. A review is made of Italy's main storage facilities. This review identifies the various types of storage techniques, major equipment, operating and maintenance practices. A look is then given at Italy's plans for the development of new facilities to meet rising demand expected to reach 80 billion cubic meters/year by the turn of the century. The operating activities of the two leading participants, SNAM and AGIP, in Italy's natural gas industry are highlighted. Specific problems which contribute to the high operating costs of natural gas storage are identified and a review is made of national normatives governing gas storage. The report comes complete with a glossary of the relative terminology and units of measure

  2. Technical problems and future underground engineering experiments

    International Nuclear Information System (INIS)

    Higgins, G.H.

    1969-01-01

    The technical problems to be solved in future underground engineering experiments are of two kinds. One concerns adequate description of the variation of nuclear explosion effects with physical nd chemical properties of the explosion site. The other concerns engineering of the explosive detonation system to provide adequate safety and security, concurrently with minimum total costs per explosion. The semiempirical equations for explosion effects can be trusted only in the range of explosive energy, depth of burst, and rock type for which there is prior experience. Effects calculations based on the principles of continuum mechanics and measurable geophysical properties appear to work in the few test cases, such as Gasbuggy, to which they have been applied. These calculational methods must be tested in a variety of situations. The relevance of dynamic and static measurements on Dragon Trail, Bronco, Rulison, Stoop, Ketch, and Pinedale to proving the methods are discussed in this paper. The traditional methods of assembling and fielding nuclear explosives have evolved from practice at the Nevada Test Site. These provide great flexibility and assure maximum recovery of all data from each test, thus minimizing the time required to achieve desired results. Timing and firing, radiation monitoring, explosives assembly and emplacement, explosive performance, weather monitoring, and dynamic measurements of earth and building motion have all been handled traditionally as independent functions. To achieve lower costs in underground engineering experiments and projects, one prototype system combining all electronic, measurement, and communication functions is being built. Much further work will be required to complete this effort, including, especially, an examination of safety criteria and means for assuring operational and public safety at reduced costs. (author)

  3. Indian Country Leaking Underground Storage Tanks, Region 9, 2016

    Science.gov (United States)

    This GIS dataset contains point features that represent Leaking Underground Storage Tanks in US EPA Region 9 Indian Country. This dataset contains facility name and locational information, status of LUST case, operating status of facility, inspection dates, and links to No Further Action letters for closed LUST cases. This database contains 1230 features, with 289 features having a LUST status of open, closed with no residual contamination, or closed with residual contamination.

  4. Coupling sections, emittance growth, and drift compensation in the use of bent solenoids as beam transport elements

    Directory of Open Access Journals (Sweden)

    J. Norem

    1999-05-01

    Full Text Available Bent solenoids can transmit charged particle beams while providing momentum dispersion. While less familiar than quadrupole and dipole systems, bent solenoids can produce superficially simple transport lines and large acceptance spectrometers for use at low energies. Design issues such as drift compensation and coupling sections between straight and bent solenoids are identified, and aberrations such as shears produced by perpendicular error fields are discussed. Examples are considered which provide the basis for the design of emittance exchange elements for the cooling system of a muon collider.

  5. A Comparative Study of Ground and Underground Vibrations Induced by Bench Blasting

    OpenAIRE

    Xiuzhi Shi; Xianyang Qiu; Jian Zhou; Dan Huang; Xin Chen; Yonggang Gou

    2016-01-01

    Ground vibrations originating from bench blasting may cause damage to slopes, structures, and underground workings in close proximity to an operating open-pit mine. It is important to monitor and predict ground vibration levels induced by blasting and to take measures to reduce their hazardous effects. The aims of this paper are to determine the weaker protection objects by comparatively studying bench blasting induced vibrations obtained at surface and in an underground tunnel in an open-pit...

  6. The possible negative consequences of underground dam and reservoir construction and operation in coastal karst areas: an example of the hydro-electric power plant (HEPP) Ombla near Dubrovnik (Croatia)

    Science.gov (United States)

    Roje-Bonacci, T.; Bonacci, O.

    2013-08-01

    The Ombla Spring represents a typical abundant coastal karst spring located in the vicinity of the town of Dubrovnik (Croatia). Its outlet is at an altitude of 2.5 m above sea level (m a.s.l.) and the water from it immediately flows into the Adriatic Sea. The minimum and maximum measured discharges are 3.96 m3 s-1 and 117 m3 s-1, respectively. The Trebišnjica River traverses through its catchment. The mean annual discharge, after the canalization of over 60 km of its watercourse with spray concrete (in the time span 1981-2011), is 24.05 m3 s-1. Before massive civil engineering work which took place during 1968-1980, the mean annual discharge was 28.35 m3 s-1. There is a project for construction of the hydro-electric power plant (HEPP) Ombla, which will exclusively use groundwater from the Ombla Spring karst aquifer. The underground dam will be constructed about 200 m behind the existing karst spring outflow in the karst massif, by injecting a grout curtain. The top of the grout curtain is planned to be at an altitude of 130 m a.s.l. This karst system is complex, sensitive, vulnerable and ecologically extremely valuable. The grout curtain, as well as the HEPP Ombla development, could lead to extremely dangerous technical and environmental consequences. In this paper some probable, negative consequences of the HEPP Ombla construction and development are explained. The HEPP Ombla could result in many large and hard-to-predict negative consequences which are specific for this particular HEPP, for example (1) severe spring discharge change; (2) unpredictable regional groundwater redistribution; (3) threatening of endemic fauna; (4) induced seismicity; (5) induced sinkholes; (6) occurrence of landslides; (7) conflict regarding internationally shared karst aquifers; (8) intensification of karst flash floods; (9) sea water intrusion in coastal karst aquifer; etc.

  7. An Effective Belt Conveyor for Underground Ore Transportation Systems

    Science.gov (United States)

    Krol, Robert; Kawalec, Witold; Gladysiewicz, Lech

    2017-12-01

    Raw material transportation generates a substantial share of costs in the mining industry. Mining companies are therefore determined to improve the effectiveness of their transportation system, focusing on solutions that increase both its energy efficiency and reliability while keeping maintenance costs low. In the underground copper ore operations in Poland’s KGHM mines vast and complex belt conveyor systems have been used for horizontal haulage of the run-of-mine ore from mining departments to shafts. Basing upon a long-time experience in the field of analysing, testing, designing and computing of belt conveyor equipment with regard to specific operational conditions, the improvements to the standard design of an underground belt conveyor for ore transportation have been proposed. As the key elements of a belt conveyor, the energy-efficient conveyor belt and optimised carrying idlers have been developed for the new generation of underground conveyors. The proposed solutions were tested individually on the specially constructed test stands in the laboratory and in the experimental belt conveyor that was built up with the use of prototype parts and commissioned for the regular ore haulage in a mining department in the KGHM underground mine “Lubin”. Its work was monitored and the recorded operational parameters (loadings, stresses and strains, energy dissipation, belt tracking) were compared with those previously collected on a reference (standard) conveyor. These in-situ measurements have proved that the proposed solutions will return with significant energy savings and lower maintenance costs. Calculations made on the basis of measurement results in the specialized belt conveyor designing software allow to estimate the possible savings if the modernized conveyors supersede the standard ones in a large belt conveying system.

  8. A review of international underground laboratory developments

    International Nuclear Information System (INIS)

    Cheng Jianping; Yue Qian; Wu Shiyong; Shen Manbin

    2011-01-01

    Underground laboratories are essential for various important physics areas such as the search for dark matter, double beta decay, neutrino oscillation, and proton decay. At the same time, they are also a very important location for studying rock mechanics, earth structure evolution,and ecology. It is essential for a nation's basic research capability to construct and develop underground laboratories. In the past, China had no high-quality underground laboratory,in particular no deep underground laboratory,so her scientists could not work independently in major fields such as the search for dark matter,but had to collaborate with foreign scientists and share the space of foreign underground laboratories. In 2009, Tsinghua university collaborated with the Ertan Hydropower Development Company to construct an extremely deep underground laboratory, the first in China and currently the deepest in the world, in the Jinping traffic tunnel which was built to develop hydropower from the Yalong River in Sichuan province. This laboratory is named the China Jinping Underground Laboratory (CJPL) and formally opened on December 12, 2010. It is now a major independent platform in China and can host various leading basic research projects. We present a brief review of the development of various international underground laboratories,and especially describe CJPL in detail. (authors)

  9. Underground laboratories in Japan and North America

    International Nuclear Information System (INIS)

    Sobel, Henry W

    2006-01-01

    There is a blossoming demand for deep underground laboratory space to satisfy the expanding interest in experiments that require significant cosmic-ray shielding. I'll briefly describe the existing deep facilities and their plans for expansion. I will also discuss the planning for a new major underground facility in the U.S

  10. Dewatering pump control in underground coal mines

    International Nuclear Information System (INIS)

    Anthony, Kim M.

    2012-01-01

    An underground coal mine roadway dewatering network is a highly variable, constantly changing system. Pumps used in this environment need to achieve a wide range of duties that may change regularly. This article discusses the use of and preferred methods in the context of an Australian underground coal mine with conditions particular to this industry.

  11. UNDERGROUND ECONOMY, INFLUENCES ON NATIONAL ECONOMIES

    Directory of Open Access Journals (Sweden)

    CEAUȘESCU IONUT

    2015-04-01

    Full Text Available The purpose of research is to improve the understanding of nature underground economy by rational justification of the right to be enshrined a reality that, at least statistically, can no longer be neglected. So, we propose to find the answer to the question: has underground economy to stand-alone?

  12. Effects of high solenoidal magnetic fields on rf accelerating cavities

    Directory of Open Access Journals (Sweden)

    A. Moretti

    2005-07-01

    Full Text Available We have measured the effects of high (0–4.5 T magnetic fields on the operating conditions of 805 MHz accelerating cavities, and discovered that the maximum accelerating gradient drops as a function of the axial magnetic field. While the maximum gradient of any cavity is governed by a number of factors including conditioning, surface topology and materials, we argue that J×B forces within the emitters are the mechanism for enhanced breakdown in magnetic fields. The pattern of emitters changes over time and we show an example of a bright emitter which disappears during a breakdown event. We also present unique measurements of the distribution of enhancement factors, β, of secondary emitters produced in breakdown events during conditioning. We believe these secondary emitters can also be breakdown triggers, and the secondary emitter spectrum helps to determine the maximum operating field.

  13. Modelling Underground Coal Gasification—A Review

    Directory of Open Access Journals (Sweden)

    Md M. Khan

    2015-11-01

    Full Text Available The technical feasibility of underground coal gasification (UCG has been established through many field trials and laboratory-scale experiments over the past decades. However, the UCG is site specific and the commercialization of UCG is being hindered due to the lack of complete information for a specific site of operation. Since conducting UCG trials and data extraction are costly and difficult, modeling has been an important part of UCG study to predict the effect of various physical and operating parameters on the performance of the process. Over the years, various models have been developed in order to improve the understanding of the UCG process. This article reviews the approaches, key concepts, assumptions, and limitations of various forward gasification UCG models for cavity growth and product gas recovery. However, emphasis is given to the most important models, such as packed bed models, the channel model, and the coal slab model. In addition, because of the integral part of the main models, various sub-models such as drying and pyrolysis are also included in this review. The aim of this study is to provide an overview of the various simulation methodologies and sub-models in order to enhance the understanding of the critical aspects of the UCG process.

  14. Engineered barrier experiment Mont Terri underground laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Mayor, J.C. [Empresa Nacional de Residuos Radiactivos, SA (ENRESA), Madrid (Spain); Alonso, E. [Universitat Polytechnica de Catalunya (UPC-CIMNE), Madrid (Spain); Garcia-Sineriz, J.L. [AITEMIN, Madrid (Spain)

    2005-07-01

    The Engineered Barrier (EB) experiment is being carried out at the Mont Terri underground laboratory (Switzerland). The aim of the EB experiment is the demonstration of a new concept for the buffer construction of HLW repositories in horizontal drifts, in competent clay formations. The principle of this new buffer construction method is based on the combined use of a lower bed made of compacted bentonite blocks, and an upper backfill made with a bentonite pellets based material. The emplacement layout proposed in this project represents an important innovation for repositories in horizontal drifts. The fact of filling the upper part of the gap between the canister and the rock with a pellets-based type of material makes the emplacement operation much simpler, eliminating some of the most critical aspects of such operation. The experiment is carried out in a gallery excavated in the shaly facies of the Opalinus clay of Mont Terri. The geometry of the test site is a horseshoe section, 2,55 m high, 3 m wide and 15 m long. A dummy canister of the same dimensions and weight than the reference one was installed on the top of a compacted bentonite blocks bed, and the gap canister-rock was backfilled with compacted bentonite pellets. The experimental area was isolated by a concrete plug. An artificial hydration system was installed to accelerate the hydration process. In order to monitor the evolution of the system and record the values of different parameters, a data acquisition system was installed. (authors)

  15. Acoustic imaging of underground storage tank wastes

    International Nuclear Information System (INIS)

    Mech, S.J.

    1995-09-01

    Acoustics is a potential tool to determine the properties of high level wastes stored in Underground Storage Tanks. Some acoustic properties were successfully measured by a limited demonstration conducted in 114-TX. This accomplishment provides the basis for expanded efforts to qualify techniques which depend on the acoustic properties of tank wastes. This work is being sponsored by the Department of Energy under the Office of Science and Technology. In FY-1994, limited Tank Waste Remediation Systems EM-30 support was available at Hanford and Los Alamos National Laboratory. The Massachusetts Institute of Technology (MIT) and Earth Resources Laboratory (ERL) were engaged for analysis support, and Elohi Geophysics, Inc. for seismic testing services. Westinghouse-Hanford Company provided the testing and training, supplied the special engineering and safety analysis equipment and procedures, and provided the trained operators for the actual tank operations. On 11/9/94, limited in-tank tests were successfully conducted in tank 114-TX. This stabilized Single Shell Tank was reported as containing 16.8 feet of waste, the lower 6.28 feet of which contained interstitial liquid. Testing was conducted over the lower 12 feet, between two Liquid Observation Wells thirty feet apart. The ''quick-look'' data was reviewed on-site by MIT and Elohi

  16. Fabrication of solenoid-type inductor with electroplated NiFe magnetic core

    International Nuclear Information System (INIS)

    Gao Xiaoyu; Cao Ying; Zhou Yong; Ding Wen; Lei Chong; Chen Jian

    2006-01-01

    Solenoid-type inductor with ultra-low profile was fabricated by MEMS (Microelectromechanical systems) technique. NiFe film was electroplated as the magnetic core, and polyimide with a low relative permittivity was used as the insulation material. In the fabrication process, UV-LIGA, dry etching, fine polishing and electroplating technique have been adopted to achieve high performance of the solenoid-type inductor. The inductor was in size of 1.5 mmx0.9 mmx0.1 mm with coil width of 20 μm and aspect ratio of 5:1. The inductance and the quality factor were 0.42-0.345 μH and 1.8-5.3 in the frequency range of 1-10 MHz, respectively

  17. Compensation of Detector Solenoid Effects on the Beam Size in Linear Collider

    Energy Technology Data Exchange (ETDEWEB)

    Nosochkov, Y.

    2004-08-05

    In this paper, the authors discuss the optics effects of the realistic detector solenoid field on beam size at the Interaction Point (IP) of a future Linear Collider and their compensation. It is shown that most of the adverse effects on the IP beam size arise only from the part of the solenoid field which overlaps and extends beyond the final focusing quadrupoles. It is demonstrated that the most efficient and local compensation can be achieved using weak antisolenoids near the IP, while a correction scheme which employs only skew quadrupoles is less efficient, and compensation with strong antisolenoids is not appropriate. One of the advantages of the proposed antisolenoid scheme is that this compensation works well over a large range of the beam energy

  18. Effect Of The LEBT Solenoid Magnetic Field On The Beam Generation For Particle Tracking

    CERN Document Server

    Yarmohammadi Satri, M; CERN. Geneva. ATS Department

    2013-01-01

    Linac4 is a 160 MeV H- linear accelerator which will replace the 50 MeV proton Linac2 for upgrade of the LHC injectors with higher intensity and eventually an increase of the LHC luminosity. Linac4 structure is a source, a 45 keV low energy beam transport line (LEBT) with two solenoids, a 3 MeV Radiofrequency Quadrupole (RFQ), a Medium Energy Beam Transport line (MEBT), a 50 Mev DTL, a 100 Mev CCDTL and PIMS up to 160 Mev. We use Travel v4.07 and PathManager code for simulation. Firstly, we need to a file as a source and defining the beginning point (last point in tracking back) of simulation. We recognise the starting point base on the solenoid magnetic property of LEBT.

  19. Aberrations due to solenoid focusing of a multiply charged high-current ion beam

    CERN Document Server

    Grégoire, G; Lisi, N; Schnuriger, J C; Scrivens, R; Tambini, J

    2000-01-01

    At the output of a laser ion source, a high current of highly charged ions with a large range of charge states is available. The focusing of such a beam by magnetic elements causes a nonlinear space-charge field to develop which can induce large aberrations and emittance growth in the beam. Simulation of the beam from the CERN laser ion source will be presented for an ideal magnetic and electrostatic system using a radially symmetric model. In addition, the three dimensional software KOBRA3 is used for the simulation of the solenoid line. The results of these simulations will be compared with experiments performed on the CERN laser ion source with solenoids (resulting in a hollow beam) and a series of gridded electrostatic lenses. (5 refs).

  20. Recent high field Nb3Sn tape solenoids of large radial access

    International Nuclear Information System (INIS)

    Murray, F.S.; Tanksi, J.V.; Damiano, D.A.; Markiewicz, W.D.

    1981-01-01

    Large radial access in a high field solenoid magnet is important in applications of current interest. Several magnets produced recently provide examples of two types of large radial access split solenoids. The variable gap split magnet provides flexibility in allowing fields above 15 T in a ''closed position'' without radial access and, in the same magnet, allowing fields above 13 T with radial access sufficient to test large cryostable conductors. The requirement of large solid angle view of the central field region is met with a second type of split magnet incorporating conical windings. The structural support of the windings above large radial ports is a critical design issue. Procedures developed recently for the use of cryogenic strain gages in magnetic field environments have been adopted to measure support stresses. The strain gage procedure, measurement results, and comparison with analysis are presented. 6 refs

  1. Study on antilock brake system with elastic membrane vibration generated by controlled solenoid excitation

    Science.gov (United States)

    Wibowo, Zakaria, Lambang, Lullus; Triyono, Muhayat, Nurul

    2016-03-01

    The most effective chassis control system for improving vehicle safety during severe braking is anti-lock braking system (ABS). Antilock effect can be gained by vibrate the pad brake at 7 to 20 cycle per second. The aim of this study is to design a new method of antilock braking system with membrane elastic vibrated by solenoid. The influence of the pressure fluctuations of brake fluid is investigated. Vibration data is collected using a small portable accelerometer-slam stick. The experiment results that the vibration of brake pad caused by controlled solenoid excitation at 10 Hz is obtained by our new method. The result of measurements can be altered by varying brake fluid pressure.

  2. Study on antilock brake system with elastic membrane vibration generated by controlled solenoid excitation

    Energy Technology Data Exchange (ETDEWEB)

    Wibowo,, E-mail: wibowo-uns@yahoo.com; Zakaria,, E-mail: zakaaria27@gmail.com; Lambang, Lullus, E-mail: lulus-l@yahoo.com; Triyono,, E-mail: tyon-bila@yahoo.co.id; Muhayat, Nurul, E-mail: nurulmuhayat@ymail.com [Mechanical Engineering Department, Sebelas Maret University, Surakarta 57128 (Indonesia)

    2016-03-29

    The most effective chassis control system for improving vehicle safety during severe braking is anti-lock braking system (ABS). Antilock effect can be gained by vibrate the pad brake at 7 to 20 cycle per second. The aim of this study is to design a new method of antilock braking system with membrane elastic vibrated by solenoid. The influence of the pressure fluctuations of brake fluid is investigated. Vibration data is collected using a small portable accelerometer-slam stick. The experiment results that the vibration of brake pad caused by controlled solenoid excitation at 10 Hz is obtained by our new method. The result of measurements can be altered by varying brake fluid pressure.

  3. D0 Central Tracking Solenoid Energization, Controls, Interlocks and Quench Protection Initial Validation Procedures

    International Nuclear Information System (INIS)

    Jaskierny, W.; Hance, R.

    1998-01-01

    This note presents the inspection and tests to be performed on the DZERO solenoid energization, controls, interlocks and quench protection system before it is energized for the first time. This test is to be performed with a 5000A jumper at the end of the bus instead of the solenoid. This system is based in DZERO room 511. A copy of this note shall be annotated, signed and dated by the person coordinating the procedure; and filed with the system maintenance records. Annotations shall include comments about any aspect of the procedure that is abnormal or unsuccessful. The following inspections and tests shall be performed by persons knowledgeable about the system. Each individual test step should be reviewed and understood before proceeding with that step.

  4. Study on antilock brake system with elastic membrane vibration generated by controlled solenoid excitation

    International Nuclear Information System (INIS)

    Wibowo,; Zakaria,; Lambang, Lullus; Triyono,; Muhayat, Nurul

    2016-01-01

    The most effective chassis control system for improving vehicle safety during severe braking is anti-lock braking system (ABS). Antilock effect can be gained by vibrate the pad brake at 7 to 20 cycle per second. The aim of this study is to design a new method of antilock braking system with membrane elastic vibrated by solenoid. The influence of the pressure fluctuations of brake fluid is investigated. Vibration data is collected using a small portable accelerometer-slam stick. The experiment results that the vibration of brake pad caused by controlled solenoid excitation at 10 Hz is obtained by our new method. The result of measurements can be altered by varying brake fluid pressure.

  5. Radionuclide behavior at underground environment

    Energy Technology Data Exchange (ETDEWEB)

    Hahn, Phil Soo; Park, Chung Kyun; Keum, Dong Kwon; Cho, Young Hwan; Kang, Moon Ja; Baik, Min Hoon; Hahn, Kyung Won; Chun, Kwan Sik; Park, Hyun Soo

    2000-03-01

    This study of radionuclide behavior at underground environment has been carried out as a part of the study of high-level waste disposal technology development. Therefore, the main objectives of this project are constructing a data-base and producing data for the safety assessment of a high-level radioactive waste, and verification of the objectivity of the assessment through characterization of the geochemical processes and experimental validation of the radionuclide migration. The various results from the this project can be applicable to the preliminary safety and performance assessments of the established disposal concept for a future high-level radioactive waste repository. Providing required data and technical basis for assessment methodologies could be a direct application of the results. In a long-term view, the results can also be utilized as a technical background for the establishment of government policy for high-level radioactive waste disposal.

  6. Underground radioactive waste disposal concept

    International Nuclear Information System (INIS)

    Frgic, L.; Tor, K.; Hudec, M.

    2002-01-01

    The paper presents some solutions for radioactive waste disposal. An underground disposal of radioactive waste is proposed in deep boreholes of greater diameter, fitted with containers. In northern part of Croatia, the geological data are available on numerous boreholes. The boreholes were drilled during investigations and prospecting of petroleum and gas fields. The available data may prove useful in defining safe deep layers suitable for waste repositories. The paper describes a Russian disposal design, execution and verification procedure. The aim of the paper is to discuss some earlier proposed solutions, and present a solution that has not yet been considered - lowering of containers with high level radioactive waste (HLW) to at least 500 m under the ground surface.(author)

  7. Swedish mines. Underground exploitation methods

    International Nuclear Information System (INIS)

    Paucard, A.

    1960-01-01

    Between 1949 and 1957, 10 engineers of the Mining research and exploitation department of the CEA visited 17 Swedish mines during 5 field trips. This paper presents a compilation of the information gathered during these field trips concerning the different underground mining techniques used in Swedish iron mines: mining with backfilling (Central Sweden and Boliden mines); mining without backfilling (mines of the polar circle area). The following techniques are described successively: pillar drawing and backfilled slices (Ammeberg, Falun, Garpenberg, Boliden group), sub-level pillar drawing (Grangesberg, Bloettberget, Haeksberg), empty room and sub-level pillar drawing (Bodas, Haksberg, Stripa, Bastkarn), storage chamber pillar drawing (Bodas, Haeksberg, Bastkarn), and pillar drawing by block caving (ldkerberget). Reprint of a paper published in Revue de l'Industrie Minerale, vol. 41, no. 12, 1959 [fr

  8. Toxic hazards of underground excavation

    International Nuclear Information System (INIS)

    Smith, R.; Chitnis, V.; Damasian, M.

    1982-09-01

    Inadvertent intrusion into natural or man-made toxic or hazardous material deposits as a consequence of activities such as mining, excavation or tunnelling has resulted in numerous deaths and injuries in this country. This study is a preliminary investigation to identify and document instances of such fatal or injurious intrusion. An objective is to provide useful insights and information related to potential hazards due to future intrusion into underground radioactive-waste-disposal facilities. The methodology used in this study includes literature review and correspondence with appropriate government agencies and organizations. Key categories of intrusion hazards are asphyxiation, methane, hydrogen sulfide, silica and asbestos, naturally occurring radionuclides, and various mine or waste dump related hazards

  9. Radioactive wastes: underground laboratories implantation

    International Nuclear Information System (INIS)

    Bataille, Ch.

    1997-01-01

    This article studies the situation of radioactive waste management, more especially the possible storage in deep laboratories. In front of the reaction of public opinion relative to the nuclear waste question, it was essential to begin by a study on the notions of liability, transparence and democracy. At the beginning, it was a matter of underground researches with a view to doing an eventual storage of high level radioactive wastes. The Parliament had to define, through the law, a behaviour able to come to the fore for anybody. A behaviour which won recognition from authorities, from scientists, from industrial people, which guarantees the rights of populations confronted to a problem whom they were not informed, on which they received only few explanations. (N.C.)

  10. Seismic verification of underground explosions

    International Nuclear Information System (INIS)

    Glenn, L.A.

    1985-06-01

    The first nuclear test agreement, the test moratorium, was made in 1958 and lasted until the Soviet Union unilaterally resumed testing in the atmosphere in 1961. It was followed by the Limited Test Ban Treaty of 1963, which prohibited nuclear tests in the atmosphere, in outer space, and underwater. In 1974 the Threshold Test Ban Treaty (TTBT) was signed, limiting underground tests after March 1976 to a maximum yield of 250 kt. The TTBT was followed by a treaty limiting peaceful nuclear explosions and both the United States and the Soviet Union claim to be abiding by the 150-kt yield limit. A comprehensive test ban treaty (CTBT), prohibiting all testing of nuclear weapons, has also been discussed. However, a verifiable CTBT is a contradiction in terms. No monitoring technology can offer absolute assurance that very-low-yield illicit explosions have not occurred. The verification process, evasion opportunities, and cavity decoupling are discussed in this paper

  11. Toxic hazards of underground excavation

    Energy Technology Data Exchange (ETDEWEB)

    Smith, R.; Chitnis, V.; Damasian, M.; Lemm, M.; Popplesdorf, N.; Ryan, T.; Saban, C.; Cohen, J.; Smith, C.; Ciminesi, F.

    1982-09-01

    Inadvertent intrusion into natural or man-made toxic or hazardous material deposits as a consequence of activities such as mining, excavation or tunnelling has resulted in numerous deaths and injuries in this country. This study is a preliminary investigation to identify and document instances of such fatal or injurious intrusion. An objective is to provide useful insights and information related to potential hazards due to future intrusion into underground radioactive-waste-disposal facilities. The methodology used in this study includes literature review and correspondence with appropriate government agencies and organizations. Key categories of intrusion hazards are asphyxiation, methane, hydrogen sulfide, silica and asbestos, naturally occurring radionuclides, and various mine or waste dump related hazards.

  12. Locomotive track detection for underground

    Science.gov (United States)

    Ma, Zhonglei; Lang, Wenhui; Li, Xiaoming; Wei, Xing

    2017-08-01

    In order to improve the PC-based track detection system, this paper proposes a method to detect linear track for underground locomotive based on DSP + FPGA. Firstly, the analog signal outputted from the camera is sampled by A / D chip. Then the collected digital signal is preprocessed by FPGA. Secondly, the output signal of FPGA is transmitted to DSP via EMIF port. Subsequently, the adaptive threshold edge detection, polar angle and radius constrain based Hough transform are implemented by DSP. Lastly, the detected track information is transmitted to host computer through Ethernet interface. The experimental results show that the system can not only meet the requirements of real-time detection, but also has good robustness.

  13. Underground coal mining section data

    Science.gov (United States)

    Gabrill, C. P.; Urie, J. T.

    1981-01-01

    A set of tables which display the allocation of time for ten personnel and eight pieces of underground coal mining equipment to ten function categories is provided. Data from 125 full shift time studies contained in the KETRON database was utilized as the primary source data. The KETRON activity and delay codes were mapped onto JPL equipment, personnel and function categories. Computer processing was then performed to aggregate the shift level data and generate the matrices. Additional, documented time study data were analyzed and used to supplement the KETRON databased. The source data including the number of shifts are described. Specific parameters of the mines from which there data were extracted are presented. The result of the data processing including the required JPL matrices is presented. A brief comparison with a time study analysis of continuous mining systems is presented. The procedures used for processing the source data are described.

  14. Underground repository for radioactive wastes

    International Nuclear Information System (INIS)

    Cassibba, R.O.

    1989-01-01

    In the feasibility study for an underground repository in Argentina, the conceptual basis for the final disposal of high activity nuclear waste was set, as well as the biosphere isolation, according to the multiple barrier concept or to the engineering barrier system. As design limit, the container shall act as an engineering barrier, granting the isolation of the radionuclides for approximately 1000 years. The container for reprocessed and vitrified wastes shall have three metallic layers: a stainless steel inner layer, an external one of a metal to be selected and a thick intermediate lead layer preselected due to its good radiological protection and corrosion resistance. Therefore, the study of the lead corrosion behaviour in simulated media of an underground repository becomes necessary. Relevant parameters of the repository system such as temperature, pressure, water flux, variation in salt concentrations and oxidants supply shall be considered. At the same time, a study is necessary on the galvanic effect of lead coupled with different candidate metals for external layer of the container in the same experimental conditions. Also temporal evaluation about the engineering barrier system efficiency is presented in this thesis. It was considered the extrapolated results of corrosion rates and literature data about the other engineering barriers. Taking into account that corrosion is of a generalized type, the integrity of the lead shall be maintained for more than 1000 years and according to temporal evaluation, the multiple barrier concept shall retard the radionuclide dispersion to the biosphere for a period of time between 10 4 and 10 6 years. (Author) [es

  15. Seismic effects on underground openings

    International Nuclear Information System (INIS)

    Marine, I.W.; Pratt, H.R.; Wahi, K.K.; Science Applications, Inc., La Jolla, CA; Science Applications, Inc., Albuquerque, NM)

    1982-01-01

    Numerical modeling techniques were used to determine the conditions required for seismic waves generated by an earthquake to cause instability to an underground opening or create fracturing and joint movement that would lead to an increase in the permeability of the rock mass. Three different rock types (salt, granite, and shale) were considered as host media for the repository located at a depth of 600 m. Special material models were developed to account for the nonlinear material behavior of each rock type. The sensitivity analysis included variations in the in situ stress ratio, joint geometry, and pore pressures, and the presence or absence of large fractures. Three different sets of earthquake motions were used to excite the rock mass. The methodology applied was found to be suitable for studying the effects of earthquakes on underground openings. In general, the study showed that moderate earthquakes (up to 0.41 g) did not cause instability of the tunnel or major fracturing of the rock mass; however, a tremor with accelerations up to 0.95 g was amplified around the tunnel, and fracturing occurred as a result of the seismic loading in salt and granite. In situ stress is a critical parameter in determining the subsurface effects of earthquakes but is nonexistent in evaluating the cause for surface damage. In shale with the properties assumed, even the moderate seismic load resulted in tunnel instability. These studies are all generic in nature and do not abrogate the need for site and design studies for specific facilities. 30 references, 14 figures, 8 tables

  16. Laser accelerated protons captured and transported by a pulse power solenoid

    OpenAIRE

    Burris-Mog, T.; Harres, K.; Zielbauer, B.; Bagnoud, V.; Herrmannsdoerfer, T.; Roth, M.; Cowan, T. E.; Nürnberg, F.; Busold, S.; Bussmann, M.; Deppert, O.; Hoffmeister, G.; Joost, M.; Sobiella, M.; Tauschwitz, A.

    2011-01-01

    Using a pulse power solenoid, we demonstrate efficient capture of laser accelerated proton beams and the ability to control their large divergence angles and broad energy range. Simulations using measured data for the input parameters give inference into the phase-space and transport efficiencies of the captured proton beams. We conclude with results from a feasibility study of a pulse power compact achromatic gantry concept. Using a scaled target normal sheath acceleration spectrum, we prese...

  17. CALCULATIONS FOR A MERCURY JET TARGET IN A SOLENOID MAGNET CAPTURE SYSTEM

    International Nuclear Information System (INIS)

    GALLARDO, J.; KAHN, S.; PALMER, R.B.; THIEBERGER, P.; WEGGEL, R.J.; MCDONALD, K.

    2001-01-01

    A mercury jet is being considered as the production target for a muon storage ring facility to produce an intense neutrino beam. A 20 T solenoid magnet that captures pions for muon production surrounds the mercury target. As the liquid metal jet enters or exits the field eddy currents are induced. We calculate the effects that a liquid metal jet experiences in entering and exiting the magnetic field for the magnetic configuration considered in the Neutrino Factory Feasibility Study II

  18. Engineering design solutions of flux swing with structural requirements for ohmic heating solenoids

    International Nuclear Information System (INIS)

    Smith, R.A.

    1977-01-01

    Here a more detailed publication is summarized which presents analytical methods with solutions that describe the structural behavior of ohmic heating solenoids to achieve a better understanding of the relationships between the functional variables that can provide the basis for recommended design improvements. The solutions relate the requirements imposed by structural integrity to the need for producing sufficient flux swing to initiate a plasma current in the tokamak fusion machine. A method is provided to perform a detailed structural analysis of every conducting turn in the radial build of the solenoid, and computer programmed listings for the closed form solutions are made available as part of the reference document. Distinction is made in deriving separate models for the regions of the solenoid where turn-to-turn radial contact is maintained with radial compression or with a bond in the presence of radial tension, and also where there is turn-to-turn radial separation due to the absence or the loss of bonding in the presence of would be radial tension. The derivations follow the theory of elasticity for a body possessing cylindrical anisotropy where the material properties are different in the radial and tangential directions. The formulations are made practical by presenting the methods for reducing stress and for relocating the relative position for potential turn-to-turn radial delamination by permitting an arbitrary traction at the outer radial surface of the solenoid in the form of pressure or displacement such as may be applied by a containment or a shrink fit structural cylinder

  19. Transient Calibration of a Variably-Saturated Groundwater Flow Model By Iterative Ensemble Smoothering: Synthetic Case and Application to the Flow Induced During Shaft Excavation and Operation of the Bure Underground Research Laboratory

    Science.gov (United States)

    Lam, D. T.; Kerrou, J.; Benabderrahmane, H.; Perrochet, P.

    2017-12-01

    The calibration of groundwater flow models in transient state can be motivated by the expected improved characterization of the aquifer hydraulic properties, especially when supported by a rich transient dataset. In the prospect of setting up a calibration strategy for a variably-saturated transient groundwater flow model of the area around the ANDRA's Bure Underground Research Laboratory, we wish to take advantage of the long hydraulic head and flowrate time series collected near and at the access shafts in order to help inform the model hydraulic parameters. A promising inverse approach for such high-dimensional nonlinear model, and which applicability has been illustrated more extensively in other scientific fields, could be an iterative ensemble smoother algorithm initially developed for a reservoir engineering problem. Furthermore, the ensemble-based stochastic framework will allow to address to some extent the uncertainty of the calibration for a subsequent analysis of a flow process dependent prediction. By assimilating the available data in one single step, this method iteratively updates each member of an initial ensemble of stochastic realizations of parameters until the minimization of an objective function. However, as it is well known for ensemble-based Kalman methods, this correction computed from approximations of covariance matrices is most efficient when the ensemble realizations are multi-Gaussian. As shown by the comparison of the updated ensemble mean obtained for our simplified synthetic model of 2D vertical flow by using either multi-Gaussian or multipoint simulations of parameters, the ensemble smoother fails to preserve the initial connectivity of the facies and the parameter bimodal distribution. Given the geological structures depicted by the multi-layered geological model built for the real case, our goal is to find how to still best leverage the performance of the ensemble smoother while using an initial ensemble of conditional multi

  20. Salt creep design consideration for underground nuclear waste storage

    International Nuclear Information System (INIS)

    Li, W.T.; Wu, C.L.; Antonas, N.J.

    1983-01-01

    This paper summarizes the creep consideration in the design of nuclear waste storage facilities in salt, describes the non-linear analysis method for evaluating the design adequacy, and presents computational results for the current storage design. The application of rock mechanics instrumentation to assure the appropriateness of the design is discussed. It also describes the design evolution of such a facility, starting from the conceptual design, through the preliminary design, to the detailed design stage. The empirical design method, laboratory tests and numerical analyses, and the underground in situ tests have been incorporated in the design process to assure the stability of the underground openings, retrievability of waste during the operation phase and encapsulation of waste after decommissioning

  1. Beam collimation and transport of quasineutral laser-accelerated protons by a solenoid field

    International Nuclear Information System (INIS)

    Harres, K.; Alber, I.; Guenther, M.; Nuernberg, F.; Otten, A.; Schuetrumpf, J.; Roth, M.; Tauschwitz, A.; Bagnoud, V.; Daido, H.; Tampo, M.; Schollmeier, M.

    2010-01-01

    This article reports about controlling laser-accelerated proton beams with respect to beam divergence and energy. The particles are captured by a pulsed high field solenoid with a magnetic field strength of 8.6 T directly behind a flat target foil that is irradiated by a high intensity laser pulse. Proton beams with energies around 2.3 MeV and particle numbers of 10 12 could be collimated and transported over a distance of more than 300 mm. In contrast to the protons the comoving electrons are strongly deflected by the solenoid field. They propagate at a submillimeter gyroradius around the solenoid's axis which could be experimentally verified. The originated high flux electron beam produces a high space charge resulting in a stronger focusing of the proton beam than expected by tracking results. Leadoff particle-in-cell simulations show qualitatively that this effect is caused by space charge attraction due to the comoving electrons. The collimation and transport of laser-accelerated protons is the first step to provide these unique beams for further applications such as postacceleration by conventional accelerator structures.

  2. A solenoidal synthetic field and the non-Abelian Aharonov-Bohm effects in neutral atoms

    Science.gov (United States)

    Huo, Ming-Xia; Nie, Wei; Hutchinson, David A. W.; Kwek, Leong Chuan

    2014-08-01

    Cold neutral atoms provide a versatile and controllable platform for emulating various quantum systems. Despite efforts to develop artificial gauge fields in these systems, realizing a unique ideal-solenoid-shaped magnetic field within the quantum domain in any real-world physical system remains elusive. Here we propose a scheme to generate a ``hairline'' solenoid with an extremely small size around 1 micrometer which is smaller than the typical coherence length in cold atoms. Correspondingly, interference effects will play a role in transport. Despite the small size, the magnetic flux imposed on the atoms is very large thanks to the very strong field generated inside the solenoid. By arranging different sets of Laguerre-Gauss (LG) lasers, the generation of Abelian and non-Abelian SU(2) lattice gauge fields is proposed for neutral atoms in ring- and square-shaped optical lattices. As an application, interference patterns of the magnetic type-I Aharonov-Bohm (AB) effect are obtained by evolving atoms along a circle over several tens of lattice cells. During the evolution, the quantum coherence is maintained and the atoms are exposed to a large magnetic flux. The scheme requires only standard optical access, and is robust to weak particle interactions.

  3. Solenoid-free Plasma Startup in NSTX using Coaxial Helicity Injection

    International Nuclear Information System (INIS)

    Roger Raman; Jarboe, Thomas R.; Bell, Michael G.; Dennis Mueller; Nelson, Brian A.; Benoit LeBlanc; Charles Bush; Masayoshi Nagata; Ted Biewer

    2005-01-01

    The favorable properties of the Spherical Torus (ST) arise from its very small aspect ratio. However, small aspect ratio devices have very restricted space for a substantial central solenoid. Thus methods for initiating the plasma current without relying on induction from a central solenoid are essential for the viability of the ST concept. Coaxial Helicity Injection (CHI) is a promising candidate for solenoid-free plasma startup in a ST. Recent experiments on the HIT-II ST at the University of Washington, have demonstrated the capability of a new method, referred to as transient CHI, to produce a high quality, closed-flux equilibrium that has then been coupled to induction, with a reduced requirement for transformer flux [R. Raman, T.R. Jarboe, B.A. Nelson, et al., Phys. Rev. Lett. 90 (February 2003) 075005-1]. An initial test of this method on the National Spherical Torus Experiment (NSTX) has produced about 140 kA of toroidal current. Modifications are now underway to improve capability for transient CHI in NSTX

  4. A solenoidal synthetic field and the non-Abelian Aharonov-Bohm effects in neutral atoms.

    Science.gov (United States)

    Huo, Ming-Xia; Nie, Wei; Hutchinson, David A W; Kwek, Leong Chuan

    2014-08-08

    Cold neutral atoms provide a versatile and controllable platform for emulating various quantum systems. Despite efforts to develop artificial gauge fields in these systems, realizing a unique ideal-solenoid-shaped magnetic field within the quantum domain in any real-world physical system remains elusive. Here we propose a scheme to generate a "hairline" solenoid with an extremely small size around 1 micrometer which is smaller than the typical coherence length in cold atoms. Correspondingly, interference effects will play a role in transport. Despite the small size, the magnetic flux imposed on the atoms is very large thanks to the very strong field generated inside the solenoid. By arranging different sets of Laguerre-Gauss (LG) lasers, the generation of Abelian and non-Abelian SU(2) lattice gauge fields is proposed for neutral atoms in ring- and square-shaped optical lattices. As an application, interference patterns of the magnetic type-I Aharonov-Bohm (AB) effect are obtained by evolving atoms along a circle over several tens of lattice cells. During the evolution, the quantum coherence is maintained and the atoms are exposed to a large magnetic flux. The scheme requires only standard optical access, and is robust to weak particle interactions.

  5. High field solenoids and cryogenic refrigeration system for the MFTF α + T tandem mirror facility

    International Nuclear Information System (INIS)

    Schultz, J.H.; Diatchenko, N.

    1984-01-01

    MFTF-α + T is a next step mirror device, specifically designed to be an upgrade of the MFTF-B tandem mirror facility into a generic nuclear testing facility for the magnetic fusion program. The solenoid magnet concepts, in particular an 18 T choke coil and a 12 T central cell coil, reflect the dependence of the tandem mirror concept on high performance, highly irradiated solenoids. The achievement of an 18 T solenoid with a 22 cm bore is a significant accomplishment in the total absence of radiation. The achievement of a normal magnet with a fluence of 4 x 10 12 rads of absorbed neutron and gamma radiation in its insulation is a significant achievement in the total absence of field. The achievement of a superconducting magnet with an instantaneous radiation absorption of 65 mW/cm 3 and an insulation fluence of 10 10 rads, let along a magnet with a peak field of nearly 16 T and a 107 cm bore is unprecedented. The superconducting and normal coils in the 18 T magnet system are also subjected to asymmetric axial loads from external magnets, adding the requirement of being able to support normal and fault loads in either axial direction. Nevertheless, it appears that design solutions do exist. The possible approaches to the simultaneous achievement of very high field, very high irradiation and asymmetric loading are the subject of this paper, using MFTF-α + T as the worked example

  6. Magnet system for a laser heated solenoid fusion reactor

    International Nuclear Information System (INIS)

    Marston, P.G.; Nolan, J.J.; Averill, R.J.

    1976-01-01

    A hybrid magnet system is proposed that consists of a 2 m inside diameter 20 T continuous superconducting magnet surrounding a number of 4 cm bore, 20 T pulsed magnets. Each pulsed magnet encloses a plasma tube for the laser heated fusion reaction. A tritium breeder, heat exchanger, and neutron shield are located in the annular region between the pulsed magnets and the superconducting magnet. The overall length of the system is 1 kilometer. The pulsed magnets are operated in a reverse-forward current sequence so that the magnetic field in the plasma is first reduced to zero and then raised to 40 T. Novel design features are included in the pulsed magnets, pulsing circuits and the superconducting magnet. Of particular interest is the structural design which maintains practical stress levels for readily available materials in both magnets and enables operation of the superconductors in a strain-free condition. Estimated costs and comment on the advantages of the pressure support system are presented

  7. Numerical modeling of underground storage system for natural gas

    Science.gov (United States)

    Ding, J.; Wang, S.

    2017-12-01

    Natural gas is an important type of base-load energy, and its supply needs to be adjusted according to different demands in different seasons. For example, since natural gas is increasingly used to replace coal for winter heating, the demand for natural gas in winter is much higher than that in other seasons. As storage systems are the essential tools for balancing seasonal supply and demand, the design and simulation of natural gas storage systems form an important research direction. In this study, a large-scale underground storage system for natural gas is simulated based on theoretical analysis and finite element modeling.It is proven that the problem of axi-symmetric Darcy porous flow of ideal gas is governed by the Boussinesq equation. In terms of the exact solution to the Boussinesq equation, the basic operating characteristics of the underground storage system is analyzed, and it is demonstrated that the propagation distance of the pore pressure is proportional to the 1/4 power of the mass flow rate and to the 1/2 power of the propagation time. This quantitative relationship can be used to guide the overall design of natural gas underground storage systems.In order to fully capture the two-way coupling between pore pressure and elastic matrix deformation, a poro-elastic finite element model for natural gas storage is developed. Based on the numerical model, the dynamic processes of gas injection, storage and extraction are simulated, and the corresponding time-dependent surface deformations are obtained. The modeling results not only provide a theoretical basis for real-time monitoring for the operating status of the underground storage system through surface deformation measurements, but also demonstrate that a year-round balance can be achieved through periodic gas injection and extraction.This work is supported by the CAS "100 talents" Program and the National Natural Science Foundation of China (41371090).

  8. Horonobe Underground Research Laboratory project investigation report for the 2008 fiscal year

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Sano, Michiaki; Sanada, Hiroyuki; Sugita, Yutaka

    2009-11-01

    The Horonobe Underground Research Laboratory Project is planned to extend over a period 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations' 'Phase 2: Construction Phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the results of the investigations for the 2008 fiscal year (2008/2009), the 4th year of the Phase 2 investigations. The investigations, which are composed of 'Geoscientific research' and 'R and D on geological disposal technology', were carried out according to 'Horonobe Underground Research Laboratory Project Investigation Program for the 2008 Fiscal year'. The results of these investigations, along with the results which were obtained in other departments of Japan Atomic Energy Agency (JAEA), are properly offered to the implementations and the safety regulations. For the sake of this, JAEA has proceeded with the project in collaboration with experts from domestic and overseas research organisations. (author)

  9. Horonobe Underground Research Laboratory project. Investigation report for the 2010 fiscal year

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Sawada, Sumiyuki; Sugita, Yutaka

    2011-09-01

    The Horonobe Underground Research Laboratory Project is planned to extend over a period 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations', 'Phase 2: Construction Phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the results of the investigations for the 2010 fiscal year (2010/2011). The investigations, which are composed of 'Geoscientific research' and 'R and D on geological disposal technology', were carried out according to 'Horonobe Underground Research Laboratory Project Investigation Program for the 2010 Fiscal year'. The results of these investigations, along with the results which were obtained in other departments of Japan Atomic Energy Agency (JAEA), are properly offered to the implementations and the safety regulations. For the sake of this, JAEA has proceeded with the project in collaboration with experts from domestic and overseas research organisations. (author)

  10. The Tax Pressure Influence on Underground Economy Size in Romania between 2001-2010

    Directory of Open Access Journals (Sweden)

    Rodica PRIPOAIE

    2011-11-01

    Full Text Available The aggressive extension of the level of underground economy, with a more and more organized developmental character, tends to place the phenomenon as a direct threat to the proper operation of State democratic institutions and, due to the generalized internationalization trend of the phenomenon, quantification and control of underground economy constitutes a problem considered by national governments and international bodies as well. The obvious growth and refinement trends of the methods used by the „practicants” of underground activities impose the need to know and to evaluate this phenomenon, to establish the possibe reaction ways of the public power, according to the cost and consequences forecast on the short term and, especially, on the long term, of the adopted measures. It is therefore necessary to analyze all pertinent factors that influence the level and structure of the underground economy and particularly the fiscal pressure.

  11. Underground science initiatives at Los Alamos

    International Nuclear Information System (INIS)

    Simmons, L.M. Jr.

    1985-01-01

    Recently, the Los Alamos National Laboratory has proposed two major new initiatives in underground science. Following the dissolution of the original gallium solar neutrino collaboration, Los Alamos has formed a new North American collaboration. We briefly review the rationale for solar neutrino research, outline the proposal and new Monte Carlo simulations, and describe the candidate locations for the experiment. Because there is no dedicated deep underground site in North America suitable for a wide range of experiments, Los Alamos has conducted a survey of possible sites and developed a proposal to create a new National Underground Science Facility. This paper also reviews that proposal

  12. Closure of shallow underground injection wells

    International Nuclear Information System (INIS)

    Veil, J.A.; Grunewald, B.

    1993-01-01

    Shallow injection wells have long been used for disposing liquid wastes. Some of these wells have received hazardous or radioactive wastes. According to US Environmental Protection Agency (EPA) regulations, Class IV wells are those injection wells through which hazardous or radioactive wastes are injected into or above an underground source of drinking water (USDW). These wells must be closed. Generally Class V wells are injection wells through which fluids that do not contain hazardous or radioactive wastes are injected into or above a USDW. Class V wells that are responsible for violations of drinking water regulations or that pose a threat to human health must also be closed. Although EPA regulations require closure of certain types of shallow injection wells, they do not provide specific details on the closure process. This paper describes the regulatory background, DOE requirements, and the steps in a shallow injection well closure process: Identification of wells needing closure; monitoring and disposal of accumulated substances; filling and sealing of wells; and remediation. In addition, the paper describes a major national EPA shallow injection well enforcement initiative, including closure plan guidance for wells used to dispose of wastes from service station operations

  13. Underground storage tanks containing hazardous chemicals

    International Nuclear Information System (INIS)

    Wise, R.F.; Starr, J.W.; Maresca, J.W. Jr.; Hillger, R.W.; Tafuri, A.N.

    1991-01-01

    The regulations issued by the United States Environmental Protection Agency in 1988 require, with several exceptions, that underground storage tank systems containing petroleum fuels and hazardous chemicals be routinely tested for releases. This paper summarizes the release detection regulations for tank systems containing chemicals and gives a preliminary assessment of the approaches to release detection currently being used. To make this assessment, detailed discussions were conducted with providers and manufacturers of leak detection equipment and testing services, owners or operators of different types of chemical storage tank systems, and state and local regulators. While these discussions were limited to a small percentage of each type of organization, certain observations are sufficiently distinctive and important that they are reported for further investigation and evaluation. To make it clearer why certain approaches are being used, this paper also summarizes the types of chemicals being stored, the effectiveness of several leak detection testing systems, and the number and characteristics of the tank systems being used to store these products

  14. Guidelines for the development of training manuals focused on the safer use of underground machinery.

    CSIR Research Space (South Africa)

    Purdy, G

    1997-07-01

    Full Text Available The project was focused on the development of guidelines for the training of operators using high risk underground coal mining machinery. During the survey conducted it was noted that the multi-ethic nature of the machine operators made training...

  15. Extensive optimisation analyses of the piping of two large underground gas storage ariel compressors

    NARCIS (Netherlands)

    Eijk, A.; Korst, H.J.C.; Ploumen, G.; Heyer, D.

    2007-01-01

    Two large identical 6-cylinder Ariel JGB/6 compressors of each 7.5 Mw, are used for the underground gas storage (UGS) plant of Essent in Epe, Germany. The compressors can be operated at a wide range of operating conditions, e.g. variable suction and discharge pressures, 2-stage mode during gas

  16. Overview of the hydraulic characteristics of the ITER Central Solenoid Model Coil conductors after 15 years of test campaigns

    Science.gov (United States)

    Brighenti, A.; Bonifetto, R.; Isono, T.; Kawano, K.; Russo, G.; Savoldi, L.; Zanino, R.

    2017-12-01

    The ITER Central Solenoid Model Coil (CSMC) is a superconducting magnet, layer-wound two-in-hand using Nb3Sn cable-in-conduit conductors (CICCs) with the central channel typical of ITER magnets, cooled with supercritical He (SHe) at ∼4.5 K and 0.5 MPa, operating for approximately 15 years at the National Institutes for Quantum and Radiological Science and Technology in Naka, Japan. The aim of this work is to give an overview of the issues related to the hydraulic performance of the three different CICCs used in the CSMC based on the extensive experimental database put together during the past 15 years. The measured hydraulic characteristics are compared for the different test campaigns and compared also to those coming from the tests of short conductor samples when available. It is shown that the hydraulic performance of the CSMC conductors did not change significantly in the sequence of test campaigns with more than 50 cycles up to 46 kA and 8 cooldown/warmup cycles from 300 K to 4.5 K. The capability of the correlations typically used to predict the friction factor of the SHe for the design and analysis of ITER-like CICCs is also shown.

  17. ONKALO. Underground characterisation and research programme (UCRP)

    International Nuclear Information System (INIS)

    2003-09-01

    The purpose of the ONKALO Underground Characterisation and Research Programme (UCRP) is to explore Olkiluoto rock conditions and thereby enhance the current geoscientific understanding of the site, to allow the submission of an application for a construction licence for the deep repository. The characterisation programme has the following geoscientific goals: to develop and demonstrate techniques for detailed characterising volumes of rock from the underground, to update the current descriptive model of Olkiluoto bedrock and to increase confidence in this model such that it will serve the needs of construction and the Preliminary Safety Assessment Report (PSAR) in the construction licence application, and to identify volumes of rock that could be suitable for housing parts of the repository. The development of ONKALO will be based on coordinated investigation, design and construction activities. Mapping data from the tunnel front and data obtained from short probe holes will constitute most of the data needed to control the construction of ONKALO. Pilot holes will be drilled along the tunnel profile as the excavation proceeds and investigations will be carried out for geological, rock mechanics, hydrogeological and hydrogeochemical characterisation. Investigations cover more detailed mapping and sampling in parts of the tunnel, mapping and sampling of potential groundwater inflows to the tunnel and investigations from characterisation bore holes drilled from ONKALO. In addition, monitoring is planned in surface-drilled boreholes, in boreholes drilled from ONKALO, and in ONKALO itself. Monitoring will reveal changes in bedrock conditions and thus provide important information for site characterisation. The information collected by characterisation and monitoring will all be assessed in an integrated modelling effort. The aim of this modelling is both to successively enhance the description and understanding of the rock volume around ONKALO and to assess potential

  18. Radionuclide behavior at underground environment

    International Nuclear Information System (INIS)

    Hahn, Phil Soo; Park, Chung Kyun; Keum, Dong Kwon; Cho, Young Hwan; Kang, Moon Ja; Baik, Min Hoon; Hahn, Kyung Won; Park, Hyun Soo

    2003-04-01

    This study of radionuclide behavior at underground environment has been carried out as a part of the study of high-level waste disposal technology development. Therefore, the main objectives of this project are constructing a data-base and producing data for the safety assessment of a high-level radioactive waste, and verification of the objectivity of the assessment through characterization of the geochemical processes and experimental validation of the radionuclide migration. This project is composed of 6 subjects such as data production required for safety assessments, sorption properties and mechanisms, nuclide migration in the fractured rock, colloid formation and migration, nuclide speciation in deep geological environments, and total evaluation of geochemical behaviors considering multi-factors. The various results from the this project can be applicable to the preliminary safety and performance assessments of the established disposal concept for a future high-level radioactive waste repository. Providing required data and technical basis for assessment methodologies could be a direct application of the results. In a long-term view, the results can also be utilized as a technical background for the establishment of government policy for high-level radioactive waste disposal

  19. AECL's underground research laboratory: technical achievements and lessons learned

    International Nuclear Information System (INIS)

    Ohta, M.M.; Chandler, N.A.

    1997-03-01

    During the development of the research program for the Canadian Nuclear Fuel Waste Management Program in the 1970's, the need for an underground facility was recognized. AECL constructed an Underground Research Laboratory (URL) for large-scale testing and in situ engineering and performance-assessment-related experiments on key aspects of deep geological disposal in a representative geological environment. Ale URL is a unique geotechnical research and development facility because it was constructed in a previously undisturbed portion of a granitic pluton that was well characterized before construction began, and because most of the shaft and experimental areas are below the water table. The specific areas of research, development and demonstration include surface and underground characterization; groundwater and solute transport; in situ rock stress conditions; temperature and time-dependent deformation and failure characteristics of rock; excavation techniques to minimize damage to surrounding rock and to ensure safe working conditions; and the performance of seals and backfills. This report traces the evolution of the URL and summarizes the technical achievements and lessons learned during its siting, design and construction, and operating phases over the last 18 years. (author)

  20. CO2 underground storage and potential of CDM

    International Nuclear Information System (INIS)

    Shigetomi, N.; Shibuya, Y.; Nakano, M.; Akai, M.

    2005-01-01

    Carbon dioxide (CO 2 ) underground storage technologies are being used as a means to mitigate the increase in CO 2 concentration in the atmosphere. Indonesia is an oil producing and exporting country. Its reserve-production ratio which is estimated based on the current production volume is approximately 19 years. Energy demand in the future is expected to be on the rise in Indonesia. In addition, in light of the interest in enhanced oil recovery (EOR), CO 2 underground storage is also being explored. Activities to initiate the Clean Development Mechanism (CDM), which is one of the Kyoto Mechanisms, have also been actively promoted in developing countries. This paper examined an EOR operation which used CO 2 separated and recovered from waste gas at coal-fired power plants which have the highest CO 2 emission rates among human-induced CO 2 emission sources in Indonesia. The paper discussed EOR, its characteristics and features as well as case studies with specific sites in order to clarify issues and conditions for promoting CO 2 underground storage technologies into CDM. It was concluded that it is necessary to conduct additional studies on the profitability of the operation while conducting verification at the CO 2 separation and recovery site and the CO 2 storage site and consulting with relevant stakeholders of EOR operation. In addition, it was suggested that procedures should be put in place to promote the EOR operation into a CDM project by coordinating with the host country and offering it incentives. 3 refs., 1 tab., 2 figs

  1. Underground Storage Tanks - Storage Tank Locations

    Data.gov (United States)

    NSGIC Education | GIS Inventory — A Storage Tank Location is a DEP primary facility type, and its sole sub-facility is the storage tank itself. Storage tanks are aboveground or underground, and are...

  2. State Certification of Underground Storage Tanks

    National Research Council Canada - National Science Library

    Granetto, Paul

    1998-01-01

    .... The audit was performed in response to a Senate Armed Services Committee inquiry about whether state environmental regulatory agencies would be able to certify that DoD underground storage tanks...

  3. EXPERIENCE IN RISK ASSESSMENT OF UNDERGROUND CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    L. L. Kaufman

    2010-03-01

    Full Text Available The article gives examples of underground construction of hydropower station inNepaland sewer tunnel in the USA. These projects pay attention to influence of geotechnical risks and their consequences.

  4. Establishing sustainable strategies in urban underground engineering.

    Science.gov (United States)

    Curiel-Esparza, Jorge; Canto-Perello, Julian; Calvo, Maria A

    2004-07-01

    Growth of urban areas, the corresponding increased demand for utility services and the possibility of new types of utility systems are overcrowding near surface underground space with urban utilities. Available subsurface space will continue to diminish to the point where utilidors (utility tunnels) may become inevitable. Establishing future sustainable strategies in urban underground engineering consists of the ability to lessen the use of traditional trenching. There is an increasing interest in utility tunnels for urban areas as a sustainable technique to avoid congestion of the subsurface. One of the principal advantages of utility tunnels is the substantially lower environmental impact compared with common trenches. Implementing these underground facilities is retarded most by the initial cost and management procedures. The habitual procedure is to meet problems as they arise in current practice. The moral imperative of sustainable strategies fails to confront the economic and political conflicts of interest. Municipal engineers should act as a key enabler in urban underground sustainable development.

  5. Leaking Underground Storage Tank Sites in Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Leaking Underground Storage Tank (LUST) sites where petroleum contamination has been found. There may be more than one LUST site per UST site.

  6. 30 CFR 57.8519 - Underground main fan controls.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground main fan controls. 57.8519 Section... Ventilation Surface and Underground § 57.8519 Underground main fan controls. All underground main fans shall have controls placed at a suitable protected location remote from the fan and preferably on the surface...

  7. Underground muons from Cygnus X-3

    International Nuclear Information System (INIS)

    Price, L.E.

    1985-01-01

    Underground detectors, intended for searches for nucleon decay and other rare processes, have recently begun searching for evidence of astrophysical sources, particularly Cygnus X-3, in the cosmic ray muons they record. Some evidence for signals from Cygnus X-3 has been reported. The underground observations are reported here in the context of previous (surface) observations of the source at high energies. 25 refs., 8 figs

  8. Heat Recovery Potential from Urban Underground Infrastructures

    OpenAIRE

    Davies, G; Boot-Handford, N; Grice, J; Dennis, W; Ajileye, A; Revesz, A; Maidment, GG

    2018-01-01

    This paper describes the results from a collaborative research project in the UK, focussing on the recovery of waste heat from underground railway tunnels, using London as a case study. The aim of the project was to investigate the feasibility of combining cooling of London’s underground railway tunnels with a waste heat recovery system. The recovered heat will then be transferred to a heat pump to upgrade its temperature, before delivery to a district heating network for reuse. The paper des...

  9. Determination of radon and progeny concentrations in Brazilian underground mines

    International Nuclear Information System (INIS)

    Fraenkel, Mario O.; Gouvea, Vandir de Azevedo; Macacini, Jose F.; Cardozo, Katia; Carvalho Filho, Carlos A. de; Lima, Carlos E.

    2008-01-01

    The aim of this work is to present the activities related to the determination of radon and progeny concentrations in underground mines in Brazil. Radon is originated from decay of radium-226 and radium-228 present in rocks. Radon and its short-lived progeny can be retained in the workers pulmonary alveoli, and this way they bring about cancer risk to these mining professionals. The occurrence of high radon concentrations in underground coal and copper mines and the lack of systematic survey motivated CNEN, the regulatory agency, to develop the Radon Project, aiming to aid the formulation of a specific regulation with occupational dose limits consistent with international standards recommended by the International Atomic Energy Agency (IAEA). Dozens of underground mines are currently in operation in the national. It had to be noted that about 50% of these mines are located in Minas Gerais province, and for this reason it was chosen to start the Project. In each underground mine it is installed in selected points passive nuclear track etch radon detectors, type LEXAN and Cr-39, for periods from three to five months. It was also made local measurements with Dose Man Pro detectors from SARAD. The points are chosen according to geological features, radiometric activity and characteristics of prospect development. The determination of radon present in mines has been made in IEN (Nuclear Engineering Institute)/Rio de Janeiro-RJ, LAPOC (Pocos de Caldas Laboratory)/Pocos de Caldas-MG e ESPOA (Porto Alegre Office)/Porto Alegre-RS. Until now it was visited about 35 mines in a universe of about 50 mines, from which 20% showed concentration values higher than international limits (ICRP 65), between 500 and 1500 Bq.m -3 . (author)

  10. Steam jacket dynamics in underground coal gasification

    Science.gov (United States)

    Otto, Christopher; Kempka, Thomas

    2017-04-01

    Underground coal gasification (UCG) has the potential to increase the world-wide hydrocarbon reserves by utilization of deposits not economically mineable by conventional methods. In this context, UCG involves combusting coal in-situ to produce a high-calorific synthesis gas, which can be applied for electricity generation or chemical feedstock production. Apart from high economic potentials, in-situ combustion may cause environmental impacts such as groundwater pollution by by-product leakage. In order to prevent or significantly mitigate these potential environmental concerns, UCG reactors are generally operated below hydrostatic pressure to limit the outflow of UCG process fluids into overburden aquifers. This pressure difference effects groundwater inflow into the reactor and prevents the escape of product gas. In the close reactor vicinity, fluid flow determined by the evolving high reactor temperatures, resulting in the build-up of a steam jacket. Numerical modeling is one of the key components to study coupled processes in in-situ combustion. We employed the thermo-hydraulic numerical simulator MUFITS (BINMIXT module) to address the influence of reactor pressure dynamics as well as hydro-geological coal and caprock parameters on water inflow and steam jacket dynamics. The US field trials Hanna and Hoe Creek (Wyoming) were applied for 3D model validation in terms of water inflow matching, whereby the good agreement between our modeling results and the field data indicates that our model reflects the hydrothermal physics of the process. In summary, our validated model allows a fast prediction of the steam jacket dynamics as well as water in- and outflows, required to avoid aquifer contamination during the entire life cycle of in-situ combustion operations.

  11. Groundwater and underground coal gasification in Alberta

    International Nuclear Information System (INIS)

    Haluszka, A.; MacMillan, G.; Maev, S.

    2010-01-01

    Underground coal gasification has potential in Alberta. This presentation provided background information on underground coal gasification and discussed groundwater and the Laurus Energy demonstration project. A multi-disciplined approach to project assessment was described with particular reference to geologic and hydrogeologic setting; geologic mapping; and a hydrogeologic numerical model. Underground coal gasification involves the conversion of coal into synthesis gas or syngas. It can be applied to mined coal at the surface or applied to non-mined coal seams using injection and production wells. Underground coal gasification can effect groundwater as the rate of water influx into the coal seams influences the quality and composition of the syngas. Byproducts created include heat as well as water with dissolved concentrations of ammonia, phenols, salts, polyaromatic hydrocarbons, and liquid organic products from the pyrolysis of coal. A process overview of underground coal gasification was also illustrated. It was concluded that underground coal gasification has the potential in Alberta and risks to groundwater could be minimized by a properly designed project. refs., figs.

  12. A Comparative Study of Ground and Underground Vibrations Induced by Bench Blasting

    Directory of Open Access Journals (Sweden)

    Xiuzhi Shi

    2016-01-01

    Full Text Available Ground vibrations originating from bench blasting may cause damage to slopes, structures, and underground workings in close proximity to an operating open-pit mine. It is important to monitor and predict ground vibration levels induced by blasting and to take measures to reduce their hazardous effects. The aims of this paper are to determine the weaker protection objects by comparatively studying bench blasting induced vibrations obtained at surface and in an underground tunnel in an open-pit mine and thus to seek vibration control methods to protect engineering objects at the site. Vibrations arising from measurement devices at surface and in an underground tunnel at the Zijinshan Open-Pit Mine were obtained. Comparative analysis of the peak particle velocities shows that, in the greatest majority of cases, surface values are higher than underground values for the same vibration distance. The transmission laws of surface and underground vibrations were established depending on the type of rock mass, the explosive charge, and the distance. Compared with the Chinese Safety Regulations for Blasting (GB6722-2014, the bench blasting induced vibrations would not currently cause damage to the underground tunnel. According to the maximum allowable peak particle velocities for different objects, the permitted maximum charges per delay are obtained to reduce damage to these objects at different distances.

  13. Evolving Notch polyQ tracts reveal possible solenoid interference elements.

    Directory of Open Access Journals (Sweden)

    Albert J Erives

    Full Text Available Polyglutamine (polyQ tracts in regulatory proteins are extremely polymorphic. As functional elements under selection for length, triplet repeats are prone to DNA replication slippage and indel mutations. Many polyQ tracts are also embedded within intrinsically disordered domains, which are less constrained, fast evolving, and difficult to characterize. To identify structural principles underlying polyQ tracts in disordered regulatory domains, here I analyze deep evolution of metazoan Notch polyQ tracts, which can generate alleles causing developmental and neurogenic defects. I show that Notch features polyQ tract turnover that is restricted to a discrete number of conserved "polyQ insertion slots". Notch polyQ insertion slots are: (i identifiable by an amphipathic "slot leader" motif; (ii conserved as an intact C-terminal array in a 1-to-1 relationship with the N-terminal solenoid-forming ankyrin repeats (ARs; and (iii enriched in carboxamide residues (Q/N, whose sidechains feature dual hydrogen bond donor and acceptor atoms. Correspondingly, the terminal loop and β-strand of each AR feature conserved carboxamide residues, which would be susceptible to folding interference by hydrogen bonding with residues outside the ARs. I thus suggest that Notch polyQ insertion slots constitute an array of AR interference elements (ARIEs. Notch ARIEs would dynamically compete with the delicate serial folding induced by adjacent ARs. Huntingtin, which harbors solenoid-forming HEAT repeats, also possesses a similar number of polyQ insertion slots. These results suggest that intrinsically disordered interference arrays featuring carboxamide and polyQ enrichment may constitute coupled proteodynamic modulators of solenoids.

  14. Algorithms for Computing the Magnetic Field, Vector Potential, and Field Derivatives for a Thin Solenoid with Uniform Current Density

    Energy Technology Data Exchange (ETDEWEB)

    Walstrom, Peter Lowell [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-08-07

    A numerical algorithm for computing the field components Br and Bz and their r and z derivatives with open boundaries in cylindrical coordinates for radially thin solenoids with uniform current density is described in this note. An algorithm for computing the vector potential Aθ is also described. For the convenience of the reader, derivations of the final expressions from their defining integrals are given in detail, since their derivations are not all easily found in textbooks. Numerical calculations are based on evaluation of complete elliptic integrals using the Bulirsch algorithm cel. The (apparently) new feature of the algorithms described in this note applies to cases where the field point is outside of the bore of the solenoid and the field-point radius approaches the solenoid radius. Since the elliptic integrals of the third kind normally used in computing Bz and Aθ become infinite in this region of parameter space, fields for points with the axial coordinate z outside of the ends of the solenoid and near the solenoid radius are treated by use of elliptic integrals of the third kind of modified argument, derived by use of an addition theorem. Also, the algorithms also avoid the numerical difficulties the textbook solutions have for points near the axis arising from explicit factors of 1/r or 1/r2 in the some of the expressions.

  15. Conceptual design of a 2 tesla superconducting solenoid for the Fermilab D{O} detector upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Brzezniak, J.; Fast, R.W.; Krempetz, K.

    1994-05-01

    This paper presents a conceptual design of a superconducting solenoid to be part of a proposed upgrade for the D0 detector. This detector was completed in 1992, and has been taking data since then. The Fermilab Tevatron had scheduled a series of luminosity enhancements prior to the startup of this detector. In response to this accelerator upgrade, efforts have been underway to design upgrades for D0 to take advantage of the new luminosity, and improvements in detector technology. This magnet is conceived as part of the new central tracking system for D0, providing a radiation-hard high-precision magnetic tracking system with excellent electron identification.

  16. Laser accelerated protons captured and transported by a pulse power solenoid

    Directory of Open Access Journals (Sweden)

    T. Burris-Mog

    2011-12-01

    Full Text Available Using a pulse power solenoid, we demonstrate efficient capture of laser accelerated proton beams and the ability to control their large divergence angles and broad energy range. Simulations using measured data for the input parameters give inference into the phase-space and transport efficiencies of the captured proton beams. We conclude with results from a feasibility study of a pulse power compact achromatic gantry concept. Using a scaled target normal sheath acceleration spectrum, we present simulation results of the available spectrum after transport through the gantry.

  17. Laser heating and magnetic compression of plasma in a fast solenoid

    International Nuclear Information System (INIS)

    Hoida, H.W.; Vlases, G.C.

    1978-01-01

    A low-β plasma column a few mm in diameter by 22 cm in length is heated by an axially directed CO 2 laser to a high-β state in a fast rising solenoidal field. Successful heating depends on proper timing between the laser pulse and rising field. Typical conditions attained are a line energy density of 6 J/cm, T-barapprox. =40 eV, and n/sub e/approx. =3 x 10 17 e - /cm 3 , with conditions quite uniform along the length. The heating suppresses instabilities which appear under certain conditions in the non-laser-heated case

  18. Transport of intense proton beams in an induction linac by solenoid lenses

    Science.gov (United States)

    Namkung, W.; Choe, J. Y.; Uhm, H. S.

    1986-01-01

    In the proposed proton induction linac at NSWC, a 100 A and 3 μs proton beam is accelerated to 5 MeV through a series of accelerating gaps. This beam can be effectively focused by solenoid lenses in this low energy regime and can be transported by adjusting the focusing strength in each period. For the transport channel design to reduce the number of independently controlled lenses, a theory of matched beams in the space-charge dominated regime has been developed. This study can be applied to cost efficient designs of induction accelerators for heavy ion fusion and free electron lasers.

  19. Modeling and Control of Retarder using On/Off Solenoid Valves

    OpenAIRE

    Steinsland, Vidar

    2008-01-01

    The Retarder is one of the main components in Scania's trucks' braking system and is used to brake down the truck and for maintaining a steady speed on descents. This Master's Thesis aims to investigate if the current system which uses a proportional valve to control the air pressure in the Retarder, can be replaced with two on/o® solenoid valves and a pressure chamber to control the air pressure, which would result in a cheaper and more robust system. By varying the air pressure, the braking...

  20. Challenges associated with the design of underground grinding plant at McArthur River project

    International Nuclear Information System (INIS)

    Jamrozek, J.S.

    2000-01-01

    McArthur River is an unique high grade uranium underground mine. Ore grinding and thickening are part of the underground operation. The grinding circuit is designed to operate in conditions different from conventional plant environments. Design of the grinding plant was a collective effort of a multi-disciplinary engineering team closely cooperating with project operating personnel. The equipment had to be selected to reflect widely varying ore properties. A user-friendly plant layout provides access to equipment inspections, services, and the delivery of necessary components. The size of the grinding chamber was limited in order to keep the rock stress levels within allowable values. All underground equipment brought to the construction site was restricted in size and weight. Plant construction faced limited storage space underground, tight erection sequencing, and schedule. Plant ventilation is a critical design feature. It efficiently removes radioactive dust from work areas, eliminates stagnant air pockets, and separates clean air from contaminated air areas. Radiation shielding on the equipment is designed to correspond with operational and maintenance functions. Plant operation is remotely controlled and requires little attendance. Video cameras are used on critical equipment and in controlled access areas. An extensive program of preventive and predictive maintenance allows highly reliable plant operation. (author)

  1. The Evolution of the Control System for the Electromagnetic Calorimeter of the Compact Muon Solenoid Experiment at the Large Hadron Collider

    CERN Multimedia

    Holme, Oliver; Dissertori, Günther; Lustermann, Werner; Zelepoukine, Serguei

    2011-01-01

    This paper discusses the evolution of the Detector Control System (DCS) designed and implemented for the Electromagnetic Calorimeter (ECAL) of the Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC) as well as the operational experience acquired during the LHC physics data taking periods of 2010 and 2011. The current implementation in terms of functionality and planned hardware upgrades are presented. Furthermore, a project for reducing the long-term software maintenance, including a year-long detailed analysis of the existing applications, is put forward and the current outcomes which have informed the design decisions for the next CMS ECAL DCS software generation are described. The main goals for the new version are to minimize external dependencies enabling smooth migration to new hardware and software platforms and to maintain the existing functionality whilst substantially reducing support and maintenance effort through homogenization, simplification and standardization of the contr...

  2. Underground pumped hydroelectric storage (UPHS). Midyear program report

    Energy Technology Data Exchange (ETDEWEB)

    Blomquist, C.A.; Frigo, A.A.; Tam, S.W.

    1979-04-01

    The midyear program report on underground pumped hydroelectric storage (UPHS) delineates program management and support elements through milestones, work proposal and authorization chart tasks, and activities for FY79 and 80. The section on subcontractors and their assigned tasks details the operating characteristcs of single- and double-stage, reversible, Franccis-type pump turbines. System studies are discussed in terms of machinery costs, plant sizes, and pump-turbine efficiencies, and results and conclusions are presented. In general, the utilization of advanced turbomachinery seems to be justified for UPHS plants.

  3. Close out of the Malargue site: Underground draining system

    International Nuclear Information System (INIS)

    Giordano, Nolberto N.; Liseno, Aldo

    2000-01-01

    An industrial uranium production facility stopped working in Malargue city, Mendoza province. Nowadays, in that place there are 700,000 tons of solid tailings piles from the uranium minerals concentration process. They must be treated inside the site through engineering works included in the final closeout project. This paper describes the project technical details of an underground drainage system, designed to depress the groundwater level and to be sure about the isolation of the solids to be treated from the groundwater. The work was done by a private company, after public bidding process. At the moment the drainage system is in operation control stage. (author)

  4. Plasma current start-up experiments without a central solenoid in the iron core STOR-M tokamak

    Science.gov (United States)

    Mitarai, O.; Tomney, G.; Rohollohi, A.; Lewis, E.; McColl, D.; Xiao, C.; Hirose, A.

    2015-06-01

    Reproducible plasma current start-up without a central solenoid (CS) has been demonstrated using the outer ohmic heating (OH) coils in the iron core STOR-M tokamak (Mitarai et al 2014 Fusion Eng. Des. 89 2467-71). Although the outer OH coil current saturates the iron core eventually, it has been demonstrated that the plasma current can be maintained during the iron core saturation phase. In this work, further studies have been conducted to investigate the effects of the turn number of the outer OH coils (N = 4 or N = 6) in the CS-less discharges and to evaluate the plasma stability with respect to the n-decay index of the vertical magnetic field. For the loose coupling of the iron core with N = 4 turns, the plasma current can be sustained after the additional third capacitor bank is applied near the iron core saturation phase, showing the slow transition from the unsaturated to the partially saturated phase. For the case of stronger coupling of N = 6 turns, the plasma current is increased at the same fast bank voltage, but the main discharge is shortened from 35 to 20 ms. As the magnetizing current is smaller due to stronger coupling between the OH coils and the plasma current, the transition from the unsaturated to the saturated phase is slightly difficult at present. The present experimental results suggest a feasible operation scenario in a future spherical tokamak (ST) at least using loose iron core coupling for smoother transition from the unsaturated to the saturated iron core phase. Thus, a reliable plasma current start-up by the outer OH coils and the current ramp-up to a steady state by additional heating power and vertical field coils could be considered as an operation scenario for future ST reactors with an iron core transformer.

  5. Underground gas storage in the World - Cedigaz survey

    International Nuclear Information System (INIS)

    Benquey, R.

    2010-01-01

    The 2010 edition of 'Underground Gas Storage in the World' provides an update to the previous survey released by CEDIGAZ in 2006. At that time, 610 underground gas storage (UGS) facilities were in operation worldwide, with a working capacity of 319 billion cubic metres (bcm). As of 1 January 2010, this number had reached 642 facilities with a working gas capacity of 333 bcm, or 10.8% of world gas consumption. By 2020, the global UGS demand is expected to grow at a pace of 3.3% per year, and according to the projects identified, more than 760 UGS sites could be active in the world with a total working capacity of approximately 465 bcm. In this survey, CEDIGAZ analyses the following trends which characterise the rapid development of underground gas storage in the world: - the strong dynamics of the European storage market, where 127 projects could add 75 bcm of working capacity by 2020, - the continued development of the UGS market in the United States (49 projects), encouraged by market-based rates allowed by the FERC, and rapid permitting processes, - the development of facilities in countries with little or no storage capacities at present, in Asia/Oceania, the C.I.S., and Eastern Europe in particular. This survey provides an analysis of the recent evolutions in the technic-economic aspects of the underground gas storage business, as well as an overview of the UGS markets and their developments in the world, country by country. A specific section is dedicated to the analysis of future UGS needs in Europe by 2020: - Technic-economic aspects of UGS: This part of the survey analyses the latest technical improvements and research axes in the field of underground gas storage. As it is more difficult to build greenfield storage facilities, a lot of work has been done to improve the performance and flexibility of existing storage sites. This section also deals with the evolution of investment and operational costs in storage over the last few years. Furthermore, the

  6. Beam collimation and energy spectrum compression of laser-accelerated proton beams using solenoid field and RF cavity

    International Nuclear Information System (INIS)

    Teng, J.; Gu, Y.Q.; Zhu, B.; Hong, W.; Zhao, Z.Q.; Zhou, W.M.; Cao, L.F.

    2013-01-01

    This paper presents a new method of laser produced proton beam collimation and spectrum compression using a combination of a solenoid field and a RF cavity. The solenoid collects laser-driven protons efficiently within an angle that is smaller than 12 degrees because it is mounted few millimeters from the target, and collimates protons with energies around 2.3 MeV. The collimated proton beam then passes through a RF cavity to allow compression of the spectrum. Particle-in-cell (PIC) simulations demonstrate the proton beam transport in the solenoid and RF electric fields. Excellent energy compression and collection efficiency of protons are presented. This method for proton beam optimization is suitable for high repetition-rate laser acceleration proton beams, which could be used as an injector for a conventional proton accelerator

  7. Beam collimation and energy spectrum compression of laser-accelerated proton beams using solenoid field and RF cavity

    Science.gov (United States)

    Teng, J.; Gu, Y. Q.; Zhu, B.; Hong, W.; Zhao, Z. Q.; Zhou, W. M.; Cao, L. F.

    2013-11-01

    This paper presents a new method of laser produced proton beam collimation and spectrum compression using a combination of a solenoid field and a RF cavity. The solenoid collects laser-driven protons efficiently within an angle that is smaller than 12 degrees because it is mounted few millimeters from the target, and collimates protons with energies around 2.3 MeV. The collimated proton beam then passes through a RF cavity to allow compression of the spectrum. Particle-in-cell (PIC) simulations demonstrate the proton beam transport in the solenoid and RF electric fields. Excellent energy compression and collection efficiency of protons are presented. This method for proton beam optimization is suitable for high repetition-rate laser acceleration proton beams, which could be used as an injector for a conventional proton accelerator.

  8. Multidimensional Risk Management for Underground Electricity Networks

    Directory of Open Access Journals (Sweden)

    Garcez Thalles V.

    2014-08-01

    Full Text Available In the paper we consider an electricity provider company that makes decision on allocating resources on electric network maintenance. The investments decrease malfunction rate of network nodes. An accidental event (explosion, fire, etc. or a malfunctioning on underground system can have various consequences and in different perspectives, such as deaths and injuries of pedestrians, fires in nearby locations, disturbances in the flow of vehicular traffic, loss to the company image, operating and financial losses, etc. For this reason it is necessary to apply an approach of the risk management that considers the multidimensional view of the consequences. Furthermore an analysis of decision making should consider network dependencies between the nodes of the electricity distribution system. In the paper we propose the use of the simulation to assess the network effects (such as the increase of the probability of other accidental event and the occurrence of blackouts of the dependent nodes in the multidimensional risk assessment in electricity grid. The analyzed effects include node overloading due to malfunction of adjacent nodes and blackouts that take place where there is temporarily no path in the grid between the power plant and a node. The simulation results show that network effects have crucial role for decisions in the network maintenance – outcomes of decisions to repair a particular node in the network can have significant influence on performance of other nodes. However, those dependencies are non-linear. The effects of network connectivity (number of connections between nodes on its multidimensional performance assessment depend heavily on the overloading effect level. The simulation results do not depend on network type structure (random or small world – however simulation outcomes for random networks have shown higher variance compared to small-world networks.

  9. Viewing Systems for Large Underground Storage Tanks

    International Nuclear Information System (INIS)

    Heckendorn, F.M.; Robinson, C.W.; Anderson, E.K.; Pardini, A.F.

    1996-01-01

    Specialized remote video systems have been successfully developed and deployed in a number of large radiological Underground Storage Tanks (USTs)that tolerate the hostile tank interior, while providing high resolution video to a remotely located operator. The deployment is through 100 mm (4 in) tank openings, while incorporating full video functions of the camera, lights, and zoom lens. The usage of remote video minimizes the potential for personnel exposure to radiological and hazardous conditions, and maximizes the quality of the visual data used to assess the interior conditions of both tank and contents. The robustness of this type of remote system has a direct effect on the potential for radiological exposure that personnel may encounter. The USTs typical of the Savannah River and Hanford Department Of Energy - (DOE) sites are typically 4.5 million liter (1.2 million gal) units under earth. or concrete overburden with limited openings to the surface. The interior is both highly contaminated and radioactive with a wide variety of nuclear processing waste material. Some of the tanks are -flammable rated -to Class 1, Division 1,and personnel presence at or near the openings should be minimized. The interior of these USTs must be assessed periodically as part of the ongoing management of the tanks and as a step towards tank remediation. The systems are unique in their deployment technology, which virtually eliminates the potential for entrapment in a tank, and their ability to withstand flammable environments. A multiplicity of components used within a common packaging allow for cost effective and appropriate levels of technology, with radiation hardened components on some units and lesser requirements on other units. All units are completely self contained for video, zoom lens, lighting, deployment,as well as being self purging, and modular in construction

  10. Particulate matter in the underground of Stockholm

    Science.gov (United States)

    Johansson, Christer; Johansson, Per-Åke

    The concentrations of PM 10 and PM 2.5 were measured during 2 weeks at an underground station in central Stockholm. The instrument, an automatic TEOM monitor (Tapered Element Oscillating Microbalance), was placed on the platform in the centre of the station. During weekdays between 7 a.m. and 7 p.m. the average PM 10 and PM 2.5 concentrations were 470 and 260 μg/ m3, respectively. These levels are a factor 5 and 10 times higher than the corresponding values measured in one of the busiest streets in central Stockholm. The concentrations in the underground followed closely the train traffic intensity. The levels were very similar from one day to the next. During Saturdays and Sundays the levels decreased slightly due to less frequent train passages. Additional measurements were performed right after the tunnel had been washed. Tunnel walls and railway tracks between the platforms of the underground system were washed using water. Only a slight reduction of the PM 10 levels (approximately 13%) could be observed during a few days after the water treatment. For PM 2.5 the reduction was even less, about 10% lower levels could be seen. This might indicate that particles from tunnel walls and tracks make only a minor contribution to the observed levels. These results confirm earlier unpublished measurements showing high levels of PM in the underground of Stockholm. Substantially, elevated particle exposure levels have also been reported in several earlier studies in the underground of London, UK.

  11. Progress on Design and Construction of a MuCool Coupling Solenoid Magnet

    Energy Technology Data Exchange (ETDEWEB)

    Wang, L.; Liu, Xiao Kun; Xu, FengYu; Li, S.; Pan, Heng; Wu, Hong; Guo, Xinglong; Zheng, ShiXian; Li, Derun; Virostek, Steve; Zisman, Mike; Green, M.A.

    2010-06-28

    The MuCool program undertaken by the US Neutrino Factory and Muon Collider Collaboration is to study the behavior of muon ionization cooling channel components. A single superconducting coupling solenoid magnet is necessary to pursue the research and development work on the performance of high gradient, large size RF cavities immersed in magnetic field, which is one of the main challenges in the practical realization of ionization cooling of muons. The MuCool coupling magnet is to be built using commercial copper based niobium titanium conductors and cooled by two cryo-coolers with each cooling capacity of 1.5 W at 4.2 K. The solenoid magnet will be powered by using a single 300A power supply through a single pair of binary leads that are designed to carry a maximum current of 210A. The magnet is to be passively protected by cold diodes and resistors across sections of the coil and by quench back from the 6061 Al mandrel in order to lower the quench voltage and the hot spot temperature. The magnet is currently under construction. This paper presents the updated design and fabrication progress on the MuCool coupling magnet.

  12. Chromatic, geometric and space charge effects on laser accelerated protons focused by a solenoid

    OpenAIRE

    Al-Omari, Husam; Hofmann, Ingo; Ratzinger, Ulrich

    2011-01-01

    We stud­ied nu­mer­i­cal­ly emit­tance and trans­mis­sion ef­fects by chro­mat­ic and ge­o­met­ric aber­ra­tions, with and with­out space charge, for a pro­ton beam be­hind a solenoid in the laser pro­ton ex­per­i­ment LIGHT at GSI. The TraceWin code was em­ployed using a field map for the solenoid and an ini­tial dis­tri­bu­tion with ex­po­nen­tial en­er­gy de­pen­dence close to the ex­per­i­ment. The re­sults show a strong ef­fect of chro­mat­ic, and a rel­a­tive­ly weak one of ge­o­met­ric...

  13. Ultrafast probing of magnetic field growth inside a laser-driven solenoid

    Science.gov (United States)

    Goyon, C.; Pollock, B. B.; Turnbull, D. P.; Hazi, A.; Divol, L.; Farmer, W. A.; Haberberger, D.; Javedani, J.; Johnson, A. J.; Kemp, A.; Levy, M. C.; Grant Logan, B.; Mariscal, D. A.; Landen, O. L.; Patankar, S.; Ross, J. S.; Rubenchik, A. M.; Swadling, G. F.; Williams, G. J.; Fujioka, S.; Law, K. F. F.; Moody, J. D.

    2017-03-01

    We report on the detection of the time-dependent B-field amplitude and topology in a laser-driven solenoid. The B-field inferred from both proton deflectometry and Faraday rotation ramps up linearly in time reaching 210 ± 35 T at the end of a 0.75-ns laser drive with 1 TW at 351 nm. A lumped-element circuit model agrees well with the linear rise and suggests that the blow-off plasma screens the field between the plates leading to an increased plate capacitance that converts the laser-generated hot-electron current into a voltage source that drives current through the solenoid. ALE3D modeling shows that target disassembly and current diffusion may limit the B-field increase for longer laser drive. Scaling of these experimental results to a National Ignition Facility (NIF) hohlraum target size (˜0.2 cm3 ) indicates that it is possible to achieve several tens of Tesla.

  14. Nano-solenoid: helicoid carbon-boron nitride hetero-nanotube.

    Science.gov (United States)

    Zhang, Zi-Yue; Miao, Chunyang; Guo, Wanlin

    2013-12-07

    As a fundamental element of a nanoscale passive circuit, a nano-inductor is proposed based on a hetero-nanotube consisting of a spiral carbon strip and a spiral boron nitride strip. It is shown by density functional theory associated with nonequilibrium Green function calculations that the nanotube exhibits attractive transport properties tunable by tube chirality, diameter, component proportion and connection manner between the two strips, with excellent 'OFF' state performance and high current on the order of 10-100 μA. All the hetero-nanotubes show negative differential resistance. The transmission peaks of current are absolutely derived from the helicoid carbon strips or C-BN boundaries, giving rise to a spiral current analogous with an energized nano-solenoid. According to Ampere's Law, the energized nano-solenoid can generate a uniform and tremendous magnetic field of more than 1 tesla, closing to that generated by the main magnet of medical nuclear magnetic resonance. Moreover, the magnitude of magnetic field can be easily modulated by bias voltage, providing great promise for a nano-inductor to realize electromagnetic conversion at the nanoscale.

  15. Non-Solenoidal Startup Research Directions on the Pegasus Toroidal Experiment

    Science.gov (United States)

    Fonck, R. J.; Bongard, M. W.; Lewicki, B. T.; Reusch, J. A.; Winz, G. R.

    2017-10-01

    The Pegasus research program has been focused on developing a physical understanding and predictive models for non-solenoidal tokamak plasma startup using Local Helicity Injection (LHI). LHI employs strong localized electron currents injected along magnetic field lines in the plasma edge that relax through magnetic turbulence to form a tokamak-like plasma. Pending approval, the Pegasus program will address a broader, more comprehensive examination of non-solenoidal tokamak startup techniques. New capabilities may include: increasing the toroidal field to 0.6 T to support critical scaling tests to near-NSTX-U field levels; deploying internal plasma diagnostics; installing a coaxial helicity injection (CHI) capability in the upper divertor region; and deploying a modest (200-400 kW) electron cyclotron RF capability. These efforts will address scaling of relevant physics to higher BT, separate and comparative studies of helicity injection techniques, efficiency of handoff to consequent current sustainment techniques, and the use of ECH to synergistically improve the target plasma for consequent bootstrap and neutral beam current drive sustainment. This has an ultimate goal of validating techniques to produce a 1 MA target plasma in NSTX-U and beyond. Work supported by US DOE Grant DE-FG02-96ER54375.

  16. Forced Two-Phase Helium Cooling Scheme for the Mu2e Transport Solenoid

    Energy Technology Data Exchange (ETDEWEB)

    Tatkowski, G. [Fermilab; Cheban, S. [Fermilab; Dhanaraj, N. [Fermilab; Evbota, D. [Fermilab; Lopes, M. [Fermilab; Nicol, T. [Fermilab; Sanders, R. [Fermilab; Schmitt, R. [Fermilab; Voirin, E. [Fermilab

    2015-01-01

    The Mu2e Transport Solenoid (TS) is an S-shaped magnet formed by two separate but similar magnets, TS-u and TS-d. Each magnet is quarter-toroid shaped with a centerline radius of approximately 3 m utilizing a helium cooling loop consisting of 25 to 27 horizontal-axis rings connected in series. This cooling loop configuration has been deemed adequate for cooling via forced single phase liquid helium; however it presents major challenges to forced two-phase flow such as “garden hose” pressure drop, concerns of flow separation from tube walls, difficulty of calculation, etc. Even with these disadvantages, forced two-phase flow has certain inherent advantages which make it a more attractive option than forced single phase flow. It is for this reason that the use of forced two-phase flow was studied for the TS magnets. This paper will describe the analysis using helium-specific pressure drop correlations, conservative engineering approach, helium properties calculated and updated at over fifty points, and how the results compared with those in literature. Based on the findings, the use of forced-two phase helium is determined to be feasible for steady-state cooling of the TS solenoids

  17. Design and Implementation Solenoid Based Kicking Mechanism for Soccer Robot Applied in Robocup-MSL

    Directory of Open Access Journals (Sweden)

    S. Hamidreza Mohades Kasaei

    2010-12-01

    Full Text Available RoboCup is an international competition to prompted robotics and related subject like: Artificial intelligence, Image processing, control, devise design and etc. One of the subjects in RoboCup competitions is Soccer. Naturally robotic soccer is an interactive and complex procedure. it might be so idealistic, but some consider a challenge with a real human football team in 2050, as the final goal of robotic soccer. There are several classes in robotic football matches such as: Middle size, Small size, simulation and so on. One of the most essential parts of a soccer robot in Middle size and Small size classes in the kicking system, this system is in charge of kicking the ball upon the command issued by the processor of robot. Almost every team develops their own unique shooting device. There are three main approaches to design and implement the robot kicking system. In this paper we designed and developed multi power kicking system that enables loop and vary shooting power. To design a good solenoid and to obtain maximum velocity of ball some parameters like: inductance, response time, resistance, force, dimensions and core-material should be balanced carefully. We used a DC-DC converter (Boost regulator for getting different currents to have different power of shooting. We are going to review the advantages of all of those approaches. Next we are purposes a novel Solenoid-based kicking system which has already been successfully implemented in Adro RoboCup team.

  18. Design and Implementation Solenoid Based Kicking Mechanism for Soccer Robot Applied in Robocup-MSL

    Directory of Open Access Journals (Sweden)

    S.Hamidreza Mohades Kasaei

    2011-01-01

    Full Text Available RoboCup is an international competition to prompted robotics and related subject like: Artificial intelligence, Image processing, control, devise design and etc. One of the subjects in RoboCup competitions is Soccer. Naturally robotic soccer is an interactive and complex procedure. it might be so idealistic, but some consider a challenge with a real human football team in 2050 , as the final goal of robotic soccer. There are several classes in robotic football matches such as: Middle size, Small size, simulation and so on. One of the most essential parts of a soccer robot in Middle size and Small size classes in the kicking system, this system is in charge of kicking the ball upon the command issued by the processor of robot. Almost every team develops their own unique shooting device. There are three main approaches to design and implement the robot kicking system. In this paper we designed and developed multi power kicking system that enables loop and vary shooting power. To design a good solenoid and to obtain maximum velocity of ball some parameters like: inductance, response time, resistance, force, dimensions and core-material should be balanced carefully. We used a DC-DC converter (Boost regulator for getting different currents to have different power of shooting. We are going to review the advantages of all of those approaches. Next we are purposes a novel Solenoid-based kicking system which has already been successfully implemented in Adro RoboCup team.

  19. Electrical characterization of S/C conductor for the CMS solenoid

    CERN Document Server

    Fabbricatore, P; Farinon, S; Greco, Michela; Kircher, F; Musenich, R

    2005-01-01

    The Compact Muon Solenoid (CMS) is one of the general-purpose detectors to be provided for the LHC project at CERN. The design field of the CMS superconducting magnet is 4 T, the magnetic length is 12.5 m and the free bore is 6 m. The coil is wound from 20 high purity aluminum-stabilized NbTi conductors with a total length of 45 km. The main peculiarity of the CMS magnet among other existing thin detector solenoids is its sandwich-type aluminum-stabilized superconductor. This special feature was chosen in order to have a mechanically self-supporting winding structure. We measured the critical current of all the 21 finished conductors in fields up to 6 T using the Ma.Ri.S.A. test facility at INFN-Genova. We compare these results with the critical current of single strands measured by CEA- Saclay, extracted from the conductor after the co-extrusion. A comparison among the measurements provides information about the possible critical current degradation and assures an accurate quality control of the conductor pr...

  20. Stress Analysis of the D-Zero Solenoid Magnet Lifting Fixture PPD Fixture No.102

    International Nuclear Information System (INIS)

    Zaczek, M.

    1997-01-01

    This engineering note presents stress analysis calculations for the below the hook lifting fixture which will be used to move the D-Zero solenoid magnet during installation work at the D-Zero Assembly building. Load bearing structural members are shown to have a minimum design factor of 3 based on yield strength as required by ASME B30.20. All bolts were analyzed and shown to be kept below allowable loads/stresses listed in the American Institute of Steel Construction (AISC) manual. The lifting fixture will be manufactured at Fermilab using some material scavenged from an existing lifting fixture that was shipped with the magnet from the magnet manufacturer, Toshiba Corporation. The fixture is designed with built in versatility so that the solenoid magnet can be maneuvered through the stages of preparation and installation into it's final mounted position. The structure has been analyzed for all phases of its use, although the analysis of the structure as a below the hook lifting device is the main purpose of this note.

  1. Design and R and D for the 22 T central solenoid for CIT

    International Nuclear Information System (INIS)

    Thome, R.J.; Pillsbury, R.D.; Bobrov, E.S.; Feng, J.; Vieira, R.

    1989-01-01

    The poloidal field coil system in a tokamak provides the equilibrium, control and shaping fields for the plasma as well as the flux change which induces plasma current and ohmic heating. In CIT all the main coils play an active part in all these functions. The PF system consists of 16 coaxial coils which will be external to the TF coils and located symmetrically in pairs with respect to the midplane of the machine. Six of the 16 coils comprise the central solenoid assembly. The OH solenoid has a bore diameter of 0.68 m, an OD of 1.4 m, a height of about 4.0 m, and a central field of almost 22 T. Geometric restrictions are such that an aggressive structural concept for the conductor is required; hence, the coil consists of a stack of explosively bonded copper/steel plates. Each plate is machined by a water-jet cutting process. This paper presents features of the design and selected results from an R and D program which is underway

  2. An Ionization Cooling Channel for Muon Beams Based on Alternating Solenoids

    International Nuclear Information System (INIS)

    Gallardo, Juan C.; Fernow, Richard C.; Kirk, Harold G.; Palmer, Robert B.; Lebrun, Paul; Moretti, Alfred; Tollestrup, Alvin T.; Kaplan, Daniel M.; Fukui, Yasuo

    1999-01-01

    The muon collider requires intense, cooled muon bunches to reach the required Luminosity. Due to the limited lifetime of the muon, the cooling process must take place very rapidly. Ionization cooling seems to be our only option, given the large emittances of the muon beam from pion decay. However, this ionization cooling method has been found quite difficult to implement in practice. We describe a scheme based on the use of liquid hydrogen absorbers followed by r.f. cavities (''pillbox'' or ''open iris'' type), embedded in a transport lattice based on high field solenoids. These solenoidal fields are reversed periodically in order to suppress the growth of the canonical angular momentum. This channel has been simulated in detail with independent codes, featuring conventional tracking in e.m. fields and detailed simulation of multiple scattering and straggling in the absorbers and windows. These calculations show that the 15 Tesla lattice cools in 6-D phase space by a factor ∼ 2 over a distance of 20 m

  3. Acceptability criteria for final underground disposal of radioactive waste

    International Nuclear Information System (INIS)

    Sousselier, Y.

    1984-01-01

    Specialists now generally agree that the underground disposal of suitably immobilized radioactive waste offers a means of attaining the basic objective of ensuring the immediate and long-term protection of man and the environment throughout the requisite period of time and in all foreseeable circumstances. Criteria of a more general as well as a more specific nature are practical means through which this basic protection objective can be reached. These criteria, which need not necessarily be quantified, enable the authorities to gauge the acceptability of a given project and provide those responsible for waste management with a basis for making decisions. In short, these principles constitute the framework of a suitably safety-oriented waste management policy. The more general criteria correspond to the protection objectives established by the national authorities on the basis of principles and recommendations formulated by international organizations, in particular the ICRP and the IAEA. They apply to any underground disposal system considered as a whole. The more specific criteria provide a means of evaluating the degree to which the various components of the disposal system meet the general criteria. They must also take account of the interaction between these components. As the ultimate aim is the overall safety of the disposal system, individual components can be adjusted to compensate for the performance of others with respect to the criteria. This is the approach adopted by the international bodies and national authorities in developing acceptability criteria for the final underground radioactive disposal systems to be used during the operational and post-operational phases respectively. The main criteria are reviewed and an attempt is made to assess the importance of the specific criteria according to the different types of disposal systems. (author)

  4. Wireless system for explosion detection in underground structures

    Science.gov (United States)

    Chikhradze, M.; Bochorishvili, N.; Akhvlediani, I.; Kukhalashvili, D.; Kalichava, I.; Mataradze, E.

    2009-06-01

    Considering the growing threat of terrorist or accidental explosions in underground stations, underground highway and railway sections improvement of system for protecting people from explosions appears urgent. Current automatic protective devices with blast identification module and blast damping absorbers of various designs as their basic elements cannot be considered effective. Analysis revealed that low reliability of blast detection and delayed generation of start signal for the activation of an absorber are the major disadvantages of protective devices. Besides the transmission of trigger signal to an energy absorber through cable communication reduces the reliability of the operation of protective device due to a possible damage of electric wiring under blast or mechanical attack. This paper presents the outcomes of the studies conducted to select accurate criteria for blast identification and to design wireless system of activation of defensive device. The results of testing of blast detection methods (seismic, EMP, optical, on overpressure) showed that the proposed method, which implies constant monitoring of overpressure in terms of its reliability and response speed, best meets the requirements. Proposed wireless system for explosions identification and activation of protective device consists of transmitter and receiver modules. Transmitter module contains sensor and microprocessor equipped with blast identification software. Receiver module produces activation signal for operation of absorber. Tests were performed in the underground experimental base of Mining Institute. The time between the moment of receiving signal by the sensor and activation of absorber - 640 microsecond; distance between transmitter and receiver in direct tunnel - at least 150m; in tunnel with 900 bending - 50m. This research is sponsored by NATO's Public Diplomacy Division in the framework of "Science for Peace".

  5. Status and Growth of Underground Science at WIPP

    Science.gov (United States)

    Rempe, Norbert T.

    2008-10-01

    The science community is increasingly taking advantage of research opportunities in the government-owned Waste Isolation Pilot Plant (WIPP), 655m underground near Carlsbad, NM. Discoveries so far include viable bacteria, cellulose, and DNA in 250 million-year old salt, preserved in an ultra-low background-radiation setting. Supplementing the overburden's shielding against cosmic radiation, terrestrial background from the host formation is less than five percent that of average crustal rock. In the past, WIPP accommodated development and testing of neutral current detectors for the Sudbury Neutrino Observatory and dark matter research, and it currently hosts two experiments pursuing neutrino-less double-beta decay. That scientists can listen to whispers from the universe in proximity to megacuries of radioactive waste lends, of course, credibility to the argument that WIPP itself is very safe. Almost a century of regional petroleum and potash extraction history and more than three decades of WIPP studies have generated a comprehensive body of knowledge on geology, mining technology, rock mechanics, geochemistry, and other disciplines relevant to underground science. Existing infrastructure is being used and can be expanded to fit experimental needs. WIPP's exemplary safety and regulatory compliance culture, low excavating and operating cost, and the high probability of the repository operating at least another 40 years make its available underground space attractive for future research and development. Recent proposals include low-photon energy counting to study internal dose received decades ago, investigations into ultra-low radiation dose response in cell cultures and laboratory animals (e.g., hormesis vs. linear no-threshold) and detectors for dark matter, solar and supernova neutrinos, and proton decay. Additional proposals compatible with WIPP's primary mission are welcome.

  6. Regulatory aspects of underground disposal of radioactive waste in Switzerland

    International Nuclear Information System (INIS)

    Luethi, H.R.

    1978-01-01

    The management of radioactive waste has become an important problem in Switzerland, and work has now begun on technical investigations and the preparation of a regulatory framework for deep-underground disposal. The law currently in force is the Federal Law on the Peaceful Use of Atomic Energyy and Radiation Protection, under which two licences are required, one for construction and one for operation. An amendment to this Law is envisaged whereby the licensing system will be modified, in particular by requiring an additional licence which will be granted by the Federal Government, with the consent of Parliament, if the safe disposal of waste can be guaranteed. The producers of radioactive waste are primarily responsible for the management thereof, but the National Co-operative Society for the Storage of Radioactive Waste (NAGRA) has the task of planning, constructing and operating repositories. The licensing authority in Switzerland is the Federal department of Communications and Energy. (NEA) [fr

  7. A quantitative investigation of the effect of a close-fitting superconducting shield on the coil factor of a solenoid

    DEFF Research Database (Denmark)

    Aarøe, Morten; Monaco, R.; Koshelet, V.

    2009-01-01

    Superconducting shields are commonly used to suppress external magnetic interference. We show, that an error of almost an order of magnitude can occur in the coil factor in realistic configurations of the solenoid and the shield. The reason is that the coil factor is determined by not only...... the geometry of the solenoid, but also the nearby magnetic environment. This has important consequences for many cryogenic experiments involving magnetic fields such as the determination of the parameters of Josephson junctions, as well as other superconducting devices. It is proposed to solve the problem...

  8. Bioremediation of Benzene-contaminated Underground Aquifers

    Science.gov (United States)

    Watanabe, Kazuya; Takahata, Yoh

    Contamination of underground aquifers with gasoline occurs frequently. Among the gasoline constituents, benzene is of great environmental concern, since it is carcinogenic, water-soluble and persistent under anaerobic conditions. We have analyzed a gasoline-contaminated underground aquifer undergoing natural attenuation, where benzene was degraded, albeit slowly, under anaerobic conditions. RNA-based stable-isotope probing identified that bacteria affiliated with the genus AZOARCUS was responsible for benzene degradation under nitrate-reducing conditions. This result was confirmed by isolating an anaerobic benzene-degrading bacterium AZOARCUS sp. strain DN11. This strain degraded benzene at relatively low concentrations (as low as 10 ppb). It could also degrade toluene and xylenes. In laboratory bioaugmentation experiments using benzene-contaminated groundwater, it was demonstrated that supplementation with DN11 significantly accelerated benzene degradation under a nitrate-reducing condition. These results indicate that DN11 is potentially useful for degrading benzene that contaminates underground aquifers at relatively low concentrations.

  9. Closures for underground nuclear power plants

    International Nuclear Information System (INIS)

    1981-10-01

    This study demonstrates that, with the appropriate selection of an access concept on the underground nuclear power plant, it is possible to design a gate complying with the increased requirements of the construction of an underground nuclear power plant. The investigations revealed that a comparison leakage of 42 mm in diameter for the failure of seals is too conservative. When selecting suitable seals a leakage being more extensive than the above mentioned one can be prevented even in case of disturbance lasting several months. The closure structures of the personnel and material accesses do not represent any weak point within the concept of the construction method for underground nuclear power plants. (orig./HP)

  10. Underground pipe inspection device and method

    Energy Technology Data Exchange (ETDEWEB)

    Germata, Daniel Thomas [Wadsworth, IL

    2009-02-24

    A method and apparatus for inspecting the walls of an underground pipe from inside the pipe in which an inspection apparatus having a circular planar platform having a plurality of lever arms having one end pivotably attached to one side of the platform, having a pipe inspection device connected to an opposite end, and having a system for pivoting the lever arms is inserted into the underground pipe, with the inspection apparatus oriented with the planar platform disposed perpendicular to the pipe axis. The plurality of lever arms are pivoted toward the inside wall of the pipe, contacting the inside wall with each inspection device as the apparatus is conveyed along a length of the underground pipe.

  11. Advanced underground Vehicle Power and Control: The locomotive Research Platform

    Energy Technology Data Exchange (ETDEWEB)

    Vehicle Projects LLC

    2003-01-28

    Develop a fuelcell mine locomotive with metal-hydride hydrogen storage. Test the locomotive for fundamental limitations preventing successful commercialization of hydride fuelcells in underground mining. During Phase 1 of the DOE-EERE sponsored project, FPI and its partner SNL, completed work on the development of a 14.4 kW fuelcell power plant and metal-hydride energy storage. An existing battery-electric locomotive with similar power requirements, minus the battery module, was used as the base vehicle. In March 2001, Atlas Copco Wagner of Portland, OR, installed the fuelcell power plant into the base vehicle and initiated integration of the system into the vehicle. The entire vehicle returned to Sandia in May 2001 for further development and integration. Initial system power-up took place in December 2001. A revision to the original contract, Phase 2, at the request of DOE Golden Field Office, established Vehicle Projects LLC as the new prime contractor,. Phase 2 allowed industry partners to conduct surface tests, incorporate enhancements to the original design by SNL, perform an extensive risk and safety analysis, and test the fuelcell locomotive underground under representative production mine conditions. During the surface tests one of the fuelcell stacks exhibited reduced power output resulting in having to replace both fuelcell stacks. The new stacks were manufactured with new and improved technology resulting in an increase of the gross power output from 14.4 kW to 17 kW. Further work by CANMET and Hatch Associates, an engineering consulting firm specializing in safety analysis for the mining industry, both under subcontract to Vehicle Projects LLC, established minimum requirements for underground testing. CANMET upgraded the Programmable Logic Control (PLC) software used to monitor and control the fuelcell power plant, taking into account locomotive operator's needs. Battery Electric, a South Africa manufacturer, designed and manufactured (at no cost

  12. Master plan of Mizunami underground research laboratory

    International Nuclear Information System (INIS)

    1999-04-01

    In June 1994, the Atomic Energy Commission of Japan reformulated the Long-Term Programme for Research, Development and Utilisation of Nuclear Energy (LTP). The LTP (item 7, chapter 3) sets out the guidelines which apply to promoting scientific studies of the deep geological environment, with a view to providing a sound basis for research and development programmes for geological disposal projects. The Japan Nuclear Cycle Development Institute (JNC) has been conducting scientific studies of the deep geological environment as part of its Geoscientific Research Programme. The LTP also emphasised the importance of deep underground research facilities in the following terms: Deep underground research facilities play an important role in research relating to geological disposal. They allow the characteristics and features of the geological environment, which require to be considered in performance assessment of disposal systems, to be investigated in situ and the reliability of the models used for evaluating system performance to be developed and refined. They also provide opportunities for carrying out comprehensive research that will contribute to an improved overall understanding of Japan's deep geological environment. It is recommended that more than one facility should be constructed, considering the range of characteristics and features of Japan's geology and other relevant factors. It is important to plan underground research facilities on the basis of results obtained from research and development work already carried out, particularly the results of scientific studies of the deep geological environment. Such a plan for underground research facilities should be clearly separated from the development of an actual repository. JNC's Mizunami underground research laboratory (MIU) Project will be a deep underground research facility as foreseen by the above provisions of the LTP. (author)

  13. Nuclear magnetic resonance at 310 MHz in a superconducting solenoid; Resonance magnetique nucleaire a 310 MHz dans un solenoide supra-conducteur

    Energy Technology Data Exchange (ETDEWEB)

    Dunand, J.J. [Commissariat a l' Energie Atomique, Grenoble (France). Centre d' Etudes Nucleaires

    1970-07-01

    The realisation of an NMR spectrometer with a superconducting magnet is presented in the first section. The methods to attain the best possible homogeneity of the magnetic field and to minimize the error in the spectrometer are described. The second section is devoted to the study of elastomers and nitr-oxides free radicals. A shift of the transition temperature with the magnetic field appears for the elastomers. The increasing paramagnetic shift has allowed a complete study by NMR of piperidinic and pyrrolidinic nitroxide free radicals. (author) [French] Dans la premiere partie est exposee la realisation d'un spectrometre de RMN utilisant un solenoide supraconducteur. Des solutions sont donnees pour obtenir la meilleure homogeneite possible du champ magnetique et pour minimiser les sources d'erreur apportees par le spectrometre. La deuxieme partie est consacree a l'etude d'elastomeres et de radicaux libres nitroxydes. Une variation de la temperature de transition avec le champ magnetique est mise en evidence pour les elastomeres. L'accroissement du deplacement paramagnetique a permis une etude complete par RMN des radicaux libres nitroxydes piperidiniques et pyrrolidiniques. (auteur)

  14. Underground Coal Gasification - Experience of ONGC

    Science.gov (United States)

    Jain, P. K.

    2017-07-01

    Underground Coal Gasification (UCG) is expected to be game changer for nation like ours that requires large amounts of energy but have few natural resources other than coal. ONGC, being an integrated energy company and due to synergy between E & P operations and UCG, envisaged opportunities in UCG business. Its first campaign on UCG started in 1980s. With its initiative, a National Committee for UCG was constituted with representatives from Ministry of Petroleum, Dept. of Coal, CSIR, CMPDIL, State of Gujarat and ONGC for experimenting a pilot. It was decided in mid-1986 to carry out a UCG pilot in Sobhasan area of Mehsana district which was to be funded by OIDB. Two information wells were drilled to generate geological, geophysical, geo-hydrological data and core/coal samples. 3-D seismic survey data of Mehsana area was processed and interpreted and geological model was prepared. Basic designing of pilot project, drilling and completion, strategy of process wells and designing of surface facilities were carried out. The project could not be pursued further due to escalation in cost and contractual difficulty with design consultant. ONGC second UCG campaign commenced with signing of an agreement of collaboration (AOC) with Skochinsky Institute of Mining (SIM), Russia on 25th November 2004 for Underground Coal Gasification (UCG). In parallel, MOUs were signed with major coal and power companies, namely, Gujarat Industries Power Company Ltd (GIPCL), Gujarat Mineral Development Corporation Ltd (GMDC), Coal India Ltd (CIL), Singareni Colliery Company Ltd (SCCL) and NLC India Ltd. Under the AOC, suitability study was carried out for different sites belonging to MOU companies. Only Vastan mine block, Nani Naroli, Surat, Gujarat was found to be suitable for UCG. Therefore, subsequent stages of detailed characterization & pilot layout, detailed engineering design were taken up for Vastan site. After enormous efforts for quite long since 2006, in the absence of UCG policy

  15. Underground Nuclear Astrophysics Experiment JUNA in China

    Science.gov (United States)

    Liu, W. P.

    Underground Nuclear Astrophysics Experiment in China (JUNA) will take the advantage of the ultra-low background in Jinping underground lab. A 400 kV high current accelerator with an ECR source and γ , neutron and charged particle detectors will be set up. We plan to study directly a number of nuclear reactions important to hydrostatic stellar evolution near their Gamow window energies such as 25Mg(p, γ )26Al, 19F(p, α )16O, 13C(α , n)16O, and 12C(α , γ )16O, by the end of 2019.

  16. Analysis and design of SSC underground structures

    International Nuclear Information System (INIS)

    Clark, G.T.

    1993-01-01

    This paper describes the analysis and design of underground structures for the Superconducting Super Collider (SSC) Project. A brief overview of the SSC Project and the types of underground structures are presented. Engineering properties and non-linear behavior of the geologic materials are reviewed. The three-dimensional sequential finite element rock-structure interaction analysis techniques developed by the author are presented and discussed. Several examples of how the method works, specific advantages, and constraints are presented. Finally, the structural designs that resulted from the sequential interaction analysis are presented

  17. Instability risk analysis and risk assessment system establishment of underground storage caverns in bedded salt rock

    Science.gov (United States)

    Jing, Wenjun; Zhao, Yan

    2018-02-01

    Stability is an important part of geotechnical engineering research. The operating experiences of underground storage caverns in salt rock all around the world show that the stability of the caverns is the key problem of safe operation. Currently, the combination of theoretical analysis and numerical simulation are the mainly adopts method of reserve stability analysis. This paper introduces the concept of risk into the stability analysis of underground geotechnical structure, and studies the instability of underground storage cavern in salt rock from the perspective of risk analysis. Firstly, the definition and classification of cavern instability risk is proposed, and the damage mechanism is analyzed from the mechanical angle. Then the main stability evaluating indicators of cavern instability risk are proposed, and an evaluation method of cavern instability risk is put forward. Finally, the established cavern instability risk assessment system is applied to the analysis and prediction of cavern instability risk after 30 years of operation in a proposed storage cavern group in the Huai’an salt mine. This research can provide a useful theoretical base for the safe operation and management of underground storage caverns in salt rock.

  18. Safety principles and technical criteria for the underground disposal of high level radioactive wastes

    International Nuclear Information System (INIS)

    1989-01-01

    The main objective of this book is to set out an internationally agreed set of principles and criteria for the design of deep underground repositories for the disposal of high level radioactive wastes. This book is concerned with the post-closure period. Consideration of the operational requirements which must be met when wastes are being handled, stored and emplaced are not therefore included

  19. 40 CFR 144.82 - What must I do to protect underground sources of drinking water?

    Science.gov (United States)

    2010-07-01

    ... sources of drinking water? 144.82 Section 144.82 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Operators of Class V Injection Wells § 144.82 What must I do to protect underground sources of drinking... contaminant may cause a violation of the primary drinking water standards under 40 CFR part 141, other health...

  20. 30 CFR 780.27 - Reclamation plan: Surface mining near underground mining.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reclamation plan: Surface mining near underground mining. 780.27 Section 780.27 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL...