WorldWideScience

Sample records for sokushin jigyo hokokusho

  1. Fiscal 2000 research achievement report. Super-advanced electronics technologies development promotion project; 2000 nendo kenkyu seika hokokusho. Cho sentan gijutsu kaihatsu sokushin jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-05-01

    For the construction of a common base of key technologies in the domain of electronics and information with the influence propagating across a wide range of industries, research and development was conducted of technologies of ultrafine working process, technologies of ultimate measurement, analysis, and control, technologies of new functional electronic materials, etc. Studied in the field of electron beam lithography were high precision and large area imaging technology, highly accurate electron optics control system technology, and beam monitoring technology. Studied in the field of ultrashort wavelength electromagnetic wave patterning system technology were proximity ultrashort wavelength electromagnetic wave patterning system technology, reduced ultrashort wavelength electromagnetic wave patterning system technology, and ultrahigh precision new materials patterning technology. Also studied were technologies of super-advanced plasma measurement, analysis, and control, and technology of super-advanced cleaning. In the field of technologies of new functional elements and films, studies were conducted about technologies of highly sensitive GMR (giant magnetoresistive) film and head fabrication process for contact magnetic recording and technologies of a spin-valve head with submicron track width for contact magnetic recording. (NEDO)

  2. Fiscal 1998 research achievement report. Project for promoting development of super-advanced electronic technology; 1998 nendo chosentan denshi gijutsu kaihatsu sokushin jigyo seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-05-01

    For the purpose of establishing super-advanced technologies two generations ahead in the field of electronics and information, research and development was carried out involving ultrafine machining process technology, technologies of ultimate measuring, analysis, and control, and technologies of electronic materials equipped with novel functions. In the study of writing systems in which writing is performed directly by an electron beam, writing technologies using electron beams under single-column and multi-column systems were taken up. In the study of ultrashort wavelength electromagnetic wave patterning systems, studies were made about equimultiple ultrashort wavelength and reduced ultrashort wavelength electromagnetic wave patterning. In the study of ultrahigh precision shielding systems, studies involved high precision in situ measurement and control of writing distortion, and ultrahigh precision and high current density electronic optical technologies. Also carried out were research and development of technologies of super-advanced plasma measurement, analysis, and control, technology of cleaning by ultrafine particle control, technology of ultrahigh sensitivity medium, and technologies of new functional elements and film fabrication. In the overall research and survey, surveys were conducted of the trends of development of technology of semiconductor related lithography. (NEDO)

  3. Report of the researcher exchange promotion project on the environmental issues in the Asia-Pacific region; Asia/Taiheiyo chiiki kankyo mondai kenkyusha koryu sokushin jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    Proposals have been made for the establishment of a network (ETERNET-APR) linking those involved in the research and development of environmental technology in the Asia-Pacific region in order to limit the environmental impact of industrial activity. By pursuing active exchanges of information and personnel, researchers in environmental technology in the Asia-Pacific region have been making serious efforts to establish such a network. This fiscal year, the Internet Web site of the ETERNET-APR has been created using the data collected to date. This database includes information on some 350 researchers and 200 research projects from seven countries. The first international symposium was successfully held at Environmental Research Institute of Chulalongkorn University in Thailand (ERIC), hosting 200 environmental researchers from 10 countries in the Asia-Pacific region. Tripartite sister laboratories ties among the National Institute for Resources and Environment (NIRE) and three Korean laboratories were forged. The sister laboratory project between ICETT and ERIC is also proving effective. These successes prove that intraregional joint research, the objective of ETERNET-APR, has begun to take shape in this year

  4. Fiscal 2000 report on result of project for promoting exchange of international environmental technology information; 2000 nendo kankyo gijutsu kokusai joho koryu sokushin jigyo seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With the purpose of sharing environmental technology information of the APEC countries, the homepage structuring was commenced linking and systematizing the home pages owned by governments, institutions, enterprises, etc., as the APEC Virtual Center (APEC-VC) project, with the fiscal 2000 results reported. In creating the homepage contents, in order to disseminate more useful information for the developing countries, 'Environmental Technology Cooperation for Developing Countries' as the original contents was prepared. In building a search engine, for the purpose of improving convenience for website users of the Virtual Center, APEC VC Japan created a retrieval system on the site. In overseas investigation, the researchers visited local plants to grasp problems and the needs by enterprises and organizations on water-pollution, waste treatment and the like, with the purpose of reflecting the investigation result in the website. In addition, the researchers visited APEC VC coordinators and/or contact points to exchange opinions with the view of expanding the network. (NEDO)

  5. Fiscal 2000 report on result of project for promoting exchange of international environmental technology information; 2000 nendo kankyo gijutsu kokusai joho koryu sokushin jigyo seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With the purpose of sharing environmental technology information of the APEC countries, the homepage structuring was commenced linking and systematizing the home pages owned by governments, institutions, enterprises, etc., as the APEC Virtual Center (APEC-VC) project, with the fiscal 2000 results reported. In creating the homepage contents, in order to disseminate more useful information for the developing countries, 'Environmental Technology Cooperation for Developing Countries' as the original contents was prepared. In building a search engine, for the purpose of improving convenience for website users of the Virtual Center, APEC VC Japan created a retrieval system on the site. In overseas investigation, the researchers visited local plants to grasp problems and the needs by enterprises and organizations on water-pollution, waste treatment and the like, with the purpose of reflecting the investigation result in the website. In addition, the researchers visited APEC VC coordinators and/or contact points to exchange opinions with the view of expanding the network. (NEDO)

  6. Fiscal 1996 survey report. `Ultra high electronic technology development promotion project` under consignment from NEDO; 1996 nendo kenkyu seika hokokusho. Shin Energy Sangyo Gijutsu Sogo Kaihatsu Kiko itaku jigyo `chosentan denshi gijutsu kaihatsu sokushin jigyo`

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    For the purpose of establishing ultra high technology of a next next generation level which is a basic technology in the electronic information field, a key to the realization of the high grade information society and a common technology base giving marked influences to the wide range industrial field, the R and D was started of ultra fine processing process technology, technologies on limit measuring/analysis/control and new functional electronic materials. Themes of the R and D are electronic beam direct picture drawing system technology, ultra short wavelength electromagnetic radiation patterning/system technology, ultra fine sensitizing technology to draw pictures on metal and crystal surfaces using ultra short wavelength laser beams, shading system technology of shading mask to be used to the process of drawing ultra high accuracy and complicated figures, ultra high tech plasma reactive measuring/analysis/control technologies which become the base of ultra thin films and ultra fine etching using plasma, ultra high tech cleaning base technology, ultra high sensitivity medium technology, new functional element/film formation technology, etc. 137 refs., 358 figs., 38 tabs.

  7. Fiscal 1997 survey report. `Ultra high electronic technology development promotion project` under consignment from NEDO; 1997 nendo kenkyu seika hokokusho. Shin Energy Sangyo Gijutsu Sogo Kaihatsu Kiko itaku jigyo `Chosentan denshi gijutsu kaihatsu sokushin jigyo`

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    For the purpose of establishing ultra high technology of a next next generation level, the R and D was conducted of ultra fine processing process technology, technologies on limit measuring/analysis/control and new functional electronic materials. Themes of the R and D are electronic beam direct picture drawing system technology, ultra short wavelength electromagnetic radiation patterning/system technology, ultra fine sensitizing technology, ultra high accuracy shading system technology, ultra high tech plasma reactive measuring/analysis/control technology, ultra high tech cleaning basic technology, ultra high sensitivity medium technology, new functional element/film formation technology, etc. This R and D is a greatly influential basic research in the whole industrial field, and therefore, it is necessary that researchers standing foremost in each field of industry/university/government join the project and that various R and D infrastructures are made the most of. For this, the concentrated joint research method and the dispersed joint research method are combined, and the R and D is being conduced by equal partnership of each researcher. 421 refs., 823 figs., 91 tabs.

  8. Fiscal 1998 research report. Current state survey for promoting the field test project for introduction of advanced industrial furnaces; 1998 nendo koseino kogyoro donyu field test jigyo ni okeru jigyo sokushin no tame no jittai chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Survey was made on the current state of installation and operation of industrial furnaces mainly in manufacturers to predict the applicability of advanced industrial furnaces, and study was made on energy consumption trends, the energy saving effect of advanced industrial furnaces, and factor extraction for their applicability. In the survey, questionnaires were delivered to 4,597 offices extracted from domestic 50,780 offices with employees more than 30, and nearly 30% of them were recovered, covering nearly 2.6% of all the offices concerned with this survey. As the survey result, the total annual energy consumption of domestic manufacturers was estimated to be 740,949 x 10{sup 6}Mcal, and among it, 709,709 x 10{sup 6}Mcal for large industrial furnaces. Under the assumption that nearly 30% of large industrial furnaces in operation are replaced with advanced industrial furnaces, energy saving expectation is estimated to be 210,000 x 10{sup 6}Mcal. Opinions and demands for this project showed the difficulty in their application to industrial furnaces in operation and study on their effects. Further enlightenment activities are necessary. (NEDO)

  9. Fiscal 1999 technical survey report. Basic project on international cooperation on energy consumption improvement, etc. (Japan International Cooperation Center project on promotion of exchange of specialists); 1999 nendo kokusai energy shohi koritsuka nado kyoryoku kiso jigyo / kokusai energy shohi koritsuka chosa nado kyoryoku kiso jigyo chosa hokokusho. Kokusai kyoryoku center jigyo suishin senmonka koryu sokushin jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    Specialist related to the governments of Thailand, Malaysia, and Indonesia where NEDO (New Energy and Industrial Technology Development Organization) implements its model projects were invited. They exchanged opinions with officials of the Japanese Government and affiliated organizations over measures for effective energy utilization. Opinions were also exchanged over the response of energy-consuming industries, development of technologies, and the status of their adoption. Activities of government-related participants are described below. Under a Model Project for Utilization of Waste Heat from Incineration of Industrial Waste at Industrial Estate, five Thai people with Industrial Estate of Thailand visited Ministry of International Trade and Industry, NEDO, NKK Corporation, Toyota Motor Corporation, and Keiyo Food Industrial Park. Under a model project on the recovery of waste heat from paper sludge incineration, four Malaysian people with Ministry of Energy, Communications and Multimedia or with Energy Center visited Ministry of International Trade and Industry, NEDO, NKK Corporation, Toyota Motor Corporation, and Japan Paperboard Industries Co., Ltd. Under a model project on the utilization of paper sludge and solid waste, four Indonesian people with Ministry of Industry and Trade or with Ministry of Mines and Energy visited Ministry of International Trade and Industry, NEDO, Babcock-Hitachi K.K., and Oji Paper Co., Ltd. (NEDO)

  10. Report on the project for spread/promotion of technology for the industrial waste optimized treatment in the Asian region; Asia chiiki sangyo haikibutsu tekiseika shori gijutsu nado fukyu sokushin jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The International Symposium `98 on the industrial waste problem in the Asian region was held in Tokyo on February 18, 1998. MITI commented on the present situation of the industrial waste problem in Japan and Japan`s environmental tackling toward the Asian region, and also Asian countries (China, the Philippines, Thailand and Korea) made reports. Japan reported on environmental preservation measures taken in the industrial circle, the industrial waste problem at companies which advanced into Asian countries, effects of the Basel Convention (which restricts border-crossing movement of harmful wastes) on recycle activities, Japan`s role in Asia, etc. In the panel discussion, discussions were made on human interchange in the informatization, recycling technology, shortage of personnel concerned with environmental protection, construction of a network in the Asian region and Japan` s role, etc. As to the treatment system for waste, the necessity was recognized of studying systems which meet with actual states of each country. It is also necessary to go on with discussing how the system should be for cooperation between governments and private companies. Importance of the recycle and information exchange was emphasized. 10 refs., 14 figs., 27 tabs.

  11. Project to promote exchange of international information on environmental technologies; Kankyo gijutsu kokusai joho koryu sokushin jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Mutual information exchange at international levels is important for practical application of global environment preservation technologies, whereas the APEC Virtual Center was established in fiscal 1997. Fiscal 1998 has discussed the future functions of the Virtual Center, and carried out the following matters to improve the functions and achieve its stable operation. Discussions were given on common use with the centers of other countries and regions of the specifications of classification systems for information areas and provided information that are provided by the Virtual Center. Visits were made to sub-managing countries and regions for smooth operation of the study groups, and opinions were exchanged. Visits were made to coordinators and contact points established in each country and region when the Center was founded in fiscal 1997. A visit was made to the U.S. Environmental Protection Agency to exchange opinions on coordination measures with the Cleaner Production Strategy of the U.S.A. being a project similar to the subject project. In order to strengthen the Japan's Center, attempts were made to expand the linking information to wider scope. Special pages publishing concentratedly the items of information that the users are interested were prepared as part of the information provision. (NEDO)

  12. Fiscal 1998 research report. Popularization project of the proper treatment technology of industrial wastes in Asian regions; 1998 nendo chosa hokokusho. Asia chiiki sangyo haikibutsu tekiseika shori gijutsu nado fukyu sokushin jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Study was made on popularization of the proper treatment technology of industrial wastes in Asian regions. In principle, industrial wastes should be recycled in a country concerned, however, because of a difference in technology and industrial location, treatment of all industrial wastes in a country concerned is impossible. International cooperation is thus indispensable to promote proper efficient practical measures for environment. For studying the possibility of the international cooperation between Japan and Asian countries concerned for further recognition and solution of industrial waste problems, 'International Symposium on the Asian Industrial Waste Issue' have been held in Tokyo since 1997 for governmental staffs. In fiscal 1998, Malaysia was invited in addition to China, Philippines and Thailand for popularization of the proper treatment and recycling of industrial wastes in Asian regions. In every Asian countries, poor collection of discharge, treatment and disposal data is an obstacle to effective treatment. Technical cooperation and financial support by developed countries are demanded. (NEDO)

  13. Report on fiscal 1995 project to promote an exchange of researchers on environmental problems in the Asia-Pacific region; 1995 nendo itakujigyo (Asia/Taiheiyo chiiki kankyo mondai kenkyusha koryu sokushin jigyo hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    For the purpose of solving environmental problems caused in association with the increasing industrial activities in the Asia-Pacific region, the construction of a research network is being advanced aiming at promoting exchanges with researchers of other countries and activating information exchanges. Investigators were sent overseas to grasp the present situation, and researchers participated in a symposium on the APEC environmental technology cooperation for mutual understanding and personal interchange. In the overseas survey, visits were paid mainly to national research institutes and universities in India and Thailand. Positive approval was obtained on the construction of the ETERNET APR (Environmental Technology Research Network in the Asia-Pacific Region). In the symposium on the APEC environmental technology cooperation held in Nagoya, researchers participated mostly in the second session and made earnest discussions with researchers from other countries. The necessity and importance of the network was emphasized. Countries which participated the symposium have problems common to each, and it was greatly significant to meet together and discuss together. The environmental problem is on a global scale, and it is necessary to make close exchange/interchange of information/opinion on a long term basis and to tackle it in the whole Asia-Pacific region. 3 tabs.

  14. Fiscal 1998 research report. Popularization project of the proper treatment technology of industrial wastes in Asian regions; 1998 nendo chosa hokokusho. Asia chiiki sangyo haikibutsu tekiseika shori gijutsu nado fukyu sokushin jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Study was made on popularization of the proper treatment technology of industrial wastes in Asian regions. In principle, industrial wastes should be recycled in a country concerned, however, because of a difference in technology and industrial location, treatment of all industrial wastes in a country concerned is impossible. International cooperation is thus indispensable to promote proper efficient practical measures for environment. For studying the possibility of the international cooperation between Japan and Asian countries concerned for further recognition and solution of industrial waste problems, 'International Symposium on the Asian Industrial Waste Issue' have been held in Tokyo since 1997 for governmental staffs. In fiscal 1998, Malaysia was invited in addition to China, Philippines and Thailand for popularization of the proper treatment and recycling of industrial wastes in Asian regions. In every Asian countries, poor collection of discharge, treatment and disposal data is an obstacle to effective treatment. Technical cooperation and financial support by developed countries are demanded. (NEDO)

  15. Report on the project for spread/promotion of technology for the industrial waste optimized treatment in the Asian region (International Symposium `98); Asia chiiki sangyo haikibutsu tekiseika shori gijutsu nado fukyu sokushin jigyo (symposium kaisai) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    In Japan and Asian countries, the optimized treatment of industrial waste is the problem with the economic growth. Border-crossing movement of the waste for promotion of the renewable use is also a problem. Therefore, the International Symposium `98 on the industrial waste problem in the Asian region was held. China, Thailand, the Philippines and Korea were invited to Japan to give lectures. MITI of Japan reported on the present situation of Japan and the cooperation with Asian countries. The industrial circle reported on efforts for environmental protection measures to be taken, the industrial waste problem at companies which advanced into Asian countries, effects of the Basel Convention on recycling activities, Japan`s role in Asia, etc. In the panel discussion, promotion of cooperation for recycling technology and Japan`s support for formulating strategy on the industrial waste were requested to Japan, and the construction of an Asian area network was proposed. Concerning the cooperative system between governments and private companies, it was concluded that it was necessary to discuss it considering the actual state of each country. Importance of recycle and information exchange was realized again. 10 refs., 15 figs., 27 tabs.

  16. Report for fiscal 1998 on industrial waste optimized treatment technologies dissemination and promotion business for asian region. Holding a symposium; 1998 nendo chosa hokokusho. Asia chiiki sangyo haikibutsu tekiseika shori gijutsu nado fukyu sokushin jigyo (symposium kaisai)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    An International Symposium on the Asian Industrial Waste Issue was held in Tokyo on 4 February 1999, where lectures were delivered by participants representing China, the Philippines, Thailand, Malaysia, and Japan. More 150 people attended the event, with questions and answered animatedly exchanged between the lecturers and the audience. The progress of urbanization is quite rapid in China, with the quantity of waste increasing every years to justify the anticipation that there will be a very sharp increase in refuse incineration in the near future. Raising a serious problem in China these days is the plastic waste. In the Philippines, there are no private-sector waste treatment/disposal facilities and corporations are not obliged to take care of their waste. Consequently, very little treatment or recycling is being undertaken. In Thailand, although waste treatment/disposal centers are in operation financed by the Government and private sectors, the cost is very high, and the Government policy is that private investment will be encouraged and supported in future. In Malaysia, privatization is in progress of the business of managing waste in the solidified form. A comprehensive waste treatment/disposal plant was completed in 1998 by the endeavors of a Denmark-Malaysia consortium, and is in operation since then. (NEDO)

  17. FY 1999 report on the survey of the basic cooperation project of enhancement of the international energy consumption efficiency. Project on promotion of exchanges with the persons concerned with government agencies, etc.; 1999 nendo kokusai energy shohi koritsuka nado kyoryoku kiso jigyo, kokusai energy shohi koritsuka chosa nado kyoryoku kiso jigyo chosa hokokusho. Seifu kikan nado kankeisha koryu sokushin jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of promoting the understanding of effective energy utilization and constructing corporative relations between countries, the persons concerned with government agencies of India, China, Indonesia, Vietnam, Myanmar and Thailand were invited to Japan, and exchanges of opinions were made on policies, technical development, the state of the introduction, etc. The persons concerned with governments of India, China and Indonesia participate in NEDO Forum 2001 to give lectures on the energy policy of their own. The persons sent from the Vietnamese government paid visits for survey to NEDO, Obayashi Corp., Kawasaki Heavy Industries, Ltd., Mitsubishi Materials Corp. and Taiheiyo Cement Corp. as reference of the model project on cement sintering plant power reduction. The persons sent from the Myanmar government paid visits for survey to NEDO, ECCJ, Chiyoda Corp., Yokogawa Electric Corp. and Cosmo Oil Co. as reference of the model project on energy conservation at fertilizer plant. The persons concerned with the Thai government paid visits for survey to the plants concerned with the model project on residue combustion waste heat recovery facilities at paper mills and the model project on waste heat recovery at steel material heating furnace. (NEDO)

  18. FY 2000 report on the survey of the project to promote and support the formation of the environmentally friendly energy community. Feasibility study on the waste utilization high efficiency power generation project; Kankyo chowagata energy community keisei sokushin jigyo chosa hokokusho. Haikibutsu riyo kokoritsu hatsuden jigyo ni kakawaru FS chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    An investigational study was conducted on energy recovery (power generation) in disposal of industrial waste. The capacity of power generation facilities in incineration processing of industrial waste reached approximately 200,000kW (50 facilities) in the total nationwide. The incineration-processed waste is mainly chips of wood, waste tire and bagasse. Almost all the electric power is for non-utility use, and there are no examples of selling it outside. In the metropolitan area, there is only one example of the industrial waste incineration power generation in Tochigi prefecture. This is because there are extremely very few enterprises which are sources producing the waste as target. However, if the industrial waste market is targeted, there is a future. The industrial waste has a lot of disadvantages as power generation use fuel because of its diversification, but the use of it as fuel is technically easier than the use of the general waste as RDF. Accordingly, it can be used for power generation with no need of special technology or facilities. When picking up facilities with a potentiality of high efficiency power generation from the existing incinerators in operation of persons in charge of industrial waste processing, approximately 125,000 kW can be obtained only from remodeling of the existing facilities. (NEDO)

  19. FY 1995 annual report on the project for promoting development of superhigh electronic techniques; 1995 nendo chosentan denshi gijutsu kaihatsu sokushin jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Described herein are the FY 1995 results of the R and D project for developing superfine machining process techniques, measurement/analysis/controlling techniques for extreme conditions, and techniques for electronic materials of new functions, in order to establish the superhigh electronic techniques of two generations beyond. The project is implemented, mainly for the following targets: direct image drawing systems with electron beams by R and D of the techniques for electro-optical systems and superhigh-accuracy controlling techniques therefor; patterning systems with supershort-wavelength electro-magnetic waves by R and D of techniques for X-ray optical systems, superhigh-accuracy controlling techniques therefor and photosensitive process techniques; superfine photosensitive techniques with ultrashort-wavelength laser beams; techniques for superhigh-accuracy light-shielding systems; superhigh techniques for measurement/analysis/controlling of plasma reactions as the bases for plasma-aided superthin film making and superfine etching; basic techniques for superhigh cleaning; techniques for superhigh-sensitivity media; techniques for elements of new functions and making thin films thereof; and techniques for electronic materials of new functions. (NEDO)

  20. Fiscal 2000 report on research exchange/technical guidance project, international research exchange project, and invitation program for overseas researchers; 2000 nendo kenkyu koryu gijutsu shido jigyo / kokusai kenkyu koryu jigyo kaigai kenkyusha shohei jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    With the purpose of promoting research exchanges with developing countries concerning preservation of the global environment, ICETT (International Center for Environmental Technology Transfer) invited two researchers from Center of Environmental Protection and Chemical Safety, Institute of Industrial Chemistry, Ministry of Industry, Vietnam. The period was from September 19 to December 17, 2000, and the subject was a basic research on environmentally friendly wastewater treatment technology utilizing bacteria in soils. In an experimental system, five reaction layers made of vinyl chloride tubes having a diameter of 16 cm and a height of 50 cm are serially connected, with a suitable filler used for each as a tank for precipitation of heavy metals and treatment of BOD, for anaerobic denitrification, for decomposition of aerobic COD, BOD, etc., for phosphorus treatment, and for bleaching (deodorizing), and with domestic wastewater treated through contact filtration. In spite of a limited period, from the obtained experimental results, the quality of water after the treatment was Class B or higher in the Japanese environmental standards for rivers, lakes and coastal waters, showing high practicability of this system. Further, some pieces of consideration were given additionally to the application in Vietnam. (NEDO)

  1. Research report for fiscal 1998 including researches into global environmental problems. Business report on the promotion of interaction of scientists over environmental problems in the Asia-Pacific region; 1998 nendo Asia/Taiheiyo chiiki kankyo mondai kenkyusha koryu sokushin jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Global environmental problems are growing quite serious in developing countries, yet they are requested to properly deal with them without making light of sustainable development, for which international cooperation and diffusion of technologies for the development of environmental technologies are mandatory. Japan, utilizing what it learned from pollution within in the past and making the best use of its technologies and knowledge for environmental improvement in developing countries in Asia, has been hosting since fiscal 1997 a function of Environmental Technology Research Network in the Asia-Pacific Region function. In fiscal 1998, a fifth international symposium was convened at Science City Center at the foot of Mt. Suzuka on November 26 and 27. The central theme was the development of environmental technologies and international cooperation for developing nations, and the event attracted 180 participants from inside Japan and abroad. A number of concrete themes came out of working groups on water quality, air quality, and energy/waste, which concerned the drafting of propositions for international collaborative researches. As for researches abroad, four typical Malaysian institutes were visited. (NEDO)

  2. Report on bio-energy survey project in Sumoto City; 2001 nendo Sumoto baio energy chosa jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    With an intention to solve environmental problems and energy problems simultaneously in Sumoto City, Hyogo prefecture, surveys have been performed on feasibility of introducing biomass energy in the district. The dairy farming in Sumoto City has a trend of increase in the number of livestocks being fed in individual farms, and increase of milking quantity per livestock (increase of sewage discharge amount), with the increase of excessive excreta amount causing a problem. The Sumoto Dairy Farming Association is experiencing generation of excreta of 156 tons a day, which requires manure handling and disposal of 112 tons a day even after deducting the field dispersion. Discussions on a biogas plant with a capacity of 100 tons a day call for biogas generation amount of 2,500 m{sup 3} a day, electric power generation amount of 4,500 kWh a day, fuel cell size of 100 kW x 2 units, and heat generation amount of 6,000 kWh a day. A total of the estimated project cost amounts to 2,450,000,000 yen, the annual running cost to 65,280,000 yen, and the annual income to 82,000,000 yen. The electric power generation cost is 135 yen per kWh, the heat production cost is 952 yen per liter (converted to kerosene), and the saving amount due to excessive electric power and heat utilization amounted to 10,700,000 yen. The annual amount of CO2 reduction is 1330 tons. (NEDO)

  3. 17th Symposium of NEDO projects. Industrial technology subcommittee; Sangyo gijutsu bunkakai. Dai 17 kai jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    Described herein are the reports presented to the industrial technology subcommittee, 17th symposium of NEDO projects. For development of high-efficiency industrial furnaces by high-temperature air combustion (including regenerative combustion), high-temperature air above 1000 degrees C is used, where carbon dioxide and NOX are possibly abated by 30% or more and 50%, respectively. The worldwide development is also described. For production of high-function ceramic materials at low temperature, the soft solution process is proposed for the in-situ production of these ceramic materials from the aqueous solution without using high temperature or high energy. For example, the high-functional ceramic material can be produced in-situ on a substrate by reacting the highly active aqueous solution with the substrate by a combination of, e.g., the hydrothermal and electrochemical reactions, without needing post-treatment under heating. For the marine biological technologies, deposition of living organisms is described. A geodome is developed for utilizing very deep (50m or deeper) underground spaces. It is a dome-shaped space supported by no strut, having dimensions of 50m in diameter and 30m high not to affect the surrounding environments, e.g., underground water. The techniques for creating advanced functional materials are developed by combining, e.g., laser, plasma, ion and magnetic field in diversified manners. (NEDO)

  4. Fiscal 1995 geothermal development promotion survey. Natural environment survey report; 1995 nendo chinetsu kaihatsu sokushin chosa. Shizen kankyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    In Candidate C area for the geothermal development survey, the natural environment was surveyed and `the secondary landscape assessment` was summed up in which places proposed for drilling of large-size wells and for construction of power generation facilities are extracted and a simulation of the landscape is conducted. The area for survey is the Shiramizu-gawa region in the south of Lake Akan, Akan-cho, Akan-gun, Hokkaido. The field survey was carried out about three items of landscape, plants and animals during the June-November period, 1995. As to the flora, diverse florae including vegetation unique to alpine areas, wetlands, and fumarole surrounding areas were found in the region, which is covered with summer-green broad-leaved forests or mixed forests of coniferous and broad-leaved trees. As to the fauna, faunae inhabitant of the highly natural forests were found including black woodpeckers and mountain hawk eagles. As a result of studying the places proposed for geothermal development from the above-mentioned survey, two places were picked up in the west of the survey area, where geothermal development is comparatively less influential in the natural environment and landscape and there is a high locational adaptability. 19 refs., 56 figs., 49 tabs.

  5. Geothermal development promotion survey report. No. 26. Akan region; 1988-1991 chinetsu kaihatsu sokushin chosa hokokusho. No. 26 Akan chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    The results of surveys conducted in the Akan region, Hokkaido, in fiscal 1988-1990 are compiled in this report. Conducted were a geological/alteration zone survey, geochemical survey, gravity prospecting, electromagnetic surveillance (simplified magnetotelluric method), electric prospecting (Schlumberger method), electric prospecting (mise-a-la-masse method), heat flow rate survey, test boring, geothermal water survey, environmental impact survey, and so forth. The surveys resulted in conclusions mentioned below. Fractures running NE-SW are dominant, and those closely related to prominent geothermal signs are found in the Akan Seibu fault group in the western part of the Akan region. The test boring results show that there are high-temperature zones of 292.1 degrees C, 194.9 degrees C, and 245.9 degrees C. Geothermal fluids were discharged by well N2-AK-7 at a rate of 4.7-4.8 t/h in steam and 0.3-0.4 t/h in neutral SO{sub 4}-HCO{sub 3} type geothermal water. High-temperature steam-dominated geothermal resources are expected to exist deep in the ground in this region, and the area where the Akan Seibu fault group is distributed may be named as a location containing promising geothermal resources. (NEDO)

  6. Geothermal development promotion survey. No. B-3 Kumaishi area; Chinethu kaihatsu sokushin chosa seika hokokusho. No. B-3. Kumaishi chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This paper summarizes the result of a geothermal resource survey carried out from fiscal 1995 through fiscal 1997 in the Kumaishi Area located in the western center of Oshima Peninsula in the south western part of Hokkaido. The survey for this area was performed with an objective to search the spread of high temperature area continuing from the adjoining Yakumo area where the highest temperature of 233 degrees C has been confirmed in a structural test well (N63-YK-6), to identify high water permeating areas in great depth points underground, and to find possibility of existence of geothermal resources. The survey included geological and alteration zone survey, geochemical survey, gravitation exploration, electromagnetic exploration, drilling and temperature logging of five structural test wells, water injection test, temperature restoration test, core survey and hot water survey. Also performed were environmental effect survey, rock age measurement, alteration age measurement, and fluid inclusion test. As a result of the survey, it was identified that the verified geothermal hot water has been stored in granites with poor water permeability, whose low temperature has not formed convection systems spreading in wide areas despite having been heated, making each system exist in small scale independently. It was estimated that the possibility is low to expect geothermal power generation. (NEDO)

  7. Geothermal development promotion survey report. No. 25. Hishikari region; 1987-1989 chinetsu kaihatsu sokushin chosa hokokusho. No. 22 Hishikari chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    The results of surveys conducted in the Hishikari region, Kagoshima Prefecture, in fiscal 1987-1989 are compiled in this report. Conducted were a geological/alteration zone survey, geochemical survey, electric prospecting, electromagnetic surveillance, gravity prospecting, heat flow rate survey, test boring, environmental impact survey, and so forth. The surveys resulted in conclusions mentioned below. According to the underground temperature distribution based on the results of the heat flow rate survey, test boring, and so forth, temperature is low at the western part of the Hishikari region where there is a low gravity anomaly and high in the zone in the ENE-WSW direction where there is a high gravity anomaly. The present ground temperature is lower than the fluid inclusion homogenization temperature by approximately 120-140 degrees C. It is deduced that the geothermal water reservoir lies in the Quatenary volcanic rocks or in a fracture zone that develops in the Shimanto supergroup. It is inferred that the geothermal water producing the hot spring water all originates in meteoric water staying long in the ground. It is also inferred that volcanic gas or the like contributes but a little to the formation of the geothermal system but that the contribution is great of the heat supplied from the magma pool. (NEDO)

  8. Geothermal development promotion survey report. No. 22. Noboribetsu region; 1987-1990 chinetsu kaihatsu sokushin chosa hokokusho. No. 22 Noboribetsu chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    The results of surveys conducted in the Noboribetsu region, Hokkaido, in fiscal 1987-1989 are compiled in this report. Conducted in the surveys were a geological/alteration zone survey, geochemical survey, electromagnetic surveillance (simplified magnetotelluric method), electric prospecting (Schlumberger method), electric prospecting (mise-a-la-masse method), heat flow rate survey, structural boring, precision structural boring, environmental exploration well, geothermal water survey, environmental impact survey, and so forth. Conclusions reached on the basis of the survey results are described below. It is supposed that a horizon, positioned in the Osarugawa stratum in the Karls Noboribetsu zone or in a fissure system in the Omagarisawa stratum below the Osarugawa stratum, contains a geothermal reservoir. The hot water at the Noboribetsu hot spring originates in gas or geothermal water separated from the deep-seated geothermal water while that at the Karls hot spring or the like originates in meteoric water built up in higher places. Although an area abundant in geothermal fluids is supposed to exist in the Karls-Noboribetsu zone, yet a section located between the Karls-Noboribetsu zone and the Noboribetsu hot spring area also draws attention as a zone having a potential to store geothermal fluids. (NEDO)

  9. FY 1998 annual report on the project of basic survey for improving energy consumption efficiency in developing countries and programs of international conferences including IPCC. Report on CDM workshop; Hatten tojokoku energy shohi koritsuka kiso chosa nado jigyo / IPCC nado kokusai kaigi jigyo (CDM workshop hokokusho) 1998 nendo jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    It is decided in the COP4 that the concrete schemes for the (Kyoto Mechanism) should be boiled down towards the end of 2000. Of the many outstanding issues concerned, those related to the clean development mechanism (CDM) involve a number of problems awaiting solution. In particular, setting the baselines for amounts of the greenhouse effect gas emissions in projects not existing, which are essential for identifying reduced amounts of emissions (or credits), poses serious difficulty because of wide arbitrariness involved in the methodology. Therefore, (standardization) of the procedures is demanded for the accurate identification. In actuality, however, no methodology has been established as to what methods will be possibly applicable to widely diversified types of projects. This workshop, therefore, has focused the discussions on the (baseline problems), expecting to serve as a trigger for the future directions by presenting international researches and promoting the discussions thereon to deepen recognition of these problems, where the AIJ experiences have served as one of the bases. (NEDO)

  10. FY 1999 project report on the invitation program for developing countries. International researcher exchange project - Researcher exchange/technical guidance project; 1999 nendo kenkyu koryu gijutsu shido jigyo / kokusai kenkyu koryu jigyo kaigai kenkyusha shohei jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the promotion of research exchanges on global environmental preservation with developing countries, Ms. Malee Santikunaporn, lecturer of Faculty of Engineering, Thammasat University, Bankok, Thailand was invited. Desulfurization/denitrification facilities, which are being widely spread in developed countries, have marked effects, but high prices are an obstacle to the spread in developing countries. To make them spread in developing countries, it is needed to develop the technology which is low in price and meets the actual state in developing countries. As a technology with high viability, a system to simultaneously remove SOx and NOx was cited in which Cu is used as catalyst and adsorbent and into which the catalyst regeneration process is integrated. Considering it, technical exchanges on Cu-SiO{sub 2} catalyst as the basic theme were made during September 26 - December 23, 1999. Through visits on and exchanges with Tokyo Institute of Technology, ICEET, University of Kyoto, etc., understanding was deepened about how each country is tackling environmental problems. The theme 'Oxidative sorption of SO2 by Cu-SiO{sub 2} catalyst: characteristics of catalyst' could deepen knowledge/information of the developmental research as a system for simultaneous removal of SOx/NOx. The data obtained indicated great practicality of Cu-SiO{sub 2}. (NEDO)

  11. Report on the geothermal development promotion survey. No.36. Mt. Amemasudake area; Chinetsu kaihatsu sokushin chosa hokokusho. No. 36 Amemasudake chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    The paper summed up the results of the geothermal development promotion survey 'Mt. Amemasudake area' which was carried out at Akaigawa village, Yoichi county, Hokkaido, from FY 1991 to FY 1994. In the survey, the following were conducted for the comprehensive analysis: surface survey such as geology/alteration zone survey, geochemical survey, gravity exploration, electromagnetic exploration and electric exploration, core test by drilling 5 boreholes, test to induce jetting of geothermal fluids, measurement of in-borehole temperature/pressure, survey of geochemical properties of geothermal water. As to the fracture system in this area, the Amemasudake fault and the Amemasuzawa fault are especially important, and it was assumed that these faults had relation to the present geothermal distribution. It is thought that structural conditions of geothermal reservoirs are fractures in basement rocks. As a result of the borehole survey, it was indicated that the center of the high-temperature part with a temperature of 250 degrees C or more was in the boundary zone southeast of this area at a level of 500m below sea level. The scale, which reached about 3km both in east/west and north/south, is almost the same scale as that of the neighboring Toyoha area where great potentiality of the geothermal development is expected. (NEDO)

  12. Report on the geothermal development promotion survey. No.36. Mt. Amemasudake area; Chinetsu kaihatsu sokushin chosa hokokusho. No. 36 Amemasudake chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    The paper summed up the results of the geothermal development promotion survey 'Mt. Amemasudake area' which was carried out at Akaigawa village, Yoichi county, Hokkaido, from FY 1991 to FY 1994. In the survey, the following were conducted for the comprehensive analysis: surface survey such as geology/alteration zone survey, geochemical survey, gravity exploration, electromagnetic exploration and electric exploration, core test by drilling 5 boreholes, test to induce jetting of geothermal fluids, measurement of in-borehole temperature/pressure, survey of geochemical properties of geothermal water. As to the fracture system in this area, the Amemasudake fault and the Amemasuzawa fault are especially important, and it was assumed that these faults had relation to the present geothermal distribution. It is thought that structural conditions of geothermal reservoirs are fractures in basement rocks. As a result of the borehole survey, it was indicated that the center of the high-temperature part with a temperature of 250 degrees C or more was in the boundary zone southeast of this area at a level of 500m below sea level. The scale, which reached about 3km both in east/west and north/south, is almost the same scale as that of the neighboring Toyoha area where great potentiality of the geothermal development is expected. (NEDO)

  13. Summary report of the overseas researcher invitation program in FY1996; 1996 nendo kaigai kenkyusha shohei jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    To exchange research information, Mr. Koernaen Inif was invited from the Ministry of Industry and Commerce, Indonesia in the period between 4th November in 1996 and 4th February in 1997 as a part of the overseas researcher invitation program in FY 1996. The research theme is `Investigation of low cost removal method of COD and BOD from industrial waste water: Biodegradation of lignin in the waste water from pulp industry using anaerobic bacteria.` The institute of the invited researcher has promoted investigations for improving water quality of the Surabaya River. The largest reason of the water quality pollution of the Surabaya River is caused by the waste water from paper and pulp industry, and pollutants are COD and BOD. In major factories with economic margins, waste water treatments have been conducted, which do not satisfy the waste water standard of factories. In this investigation, the treatment technology information of industrial waste water were collected. The information were summarized for contributing to the future research and development in Surabaya. The objective was to obtain the biodegradation techniques of lignin using anaerobic bacteria. 51 refs., 7 figs., 5 tabs.

  14. Fiscal 1998 report on Japan-Asia international cooperation project; 1998 nendo Nichi Asia kokusai kyodo kenkyu jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-01

    For the development of talent, industrial infrastructures, and new industries in countries that received Japanese cooperation, Japanese researchers were sent to universities and research organizations in Asian countries, where they were engaged in joint research and development, which involved (1) micro device technology, (2) technology for manufacturing industrial silica material by chaff incineration, (3) technology for forming and machining of alloys difficult to machine, light in weight, and high in strength, (4) technology for rare metal isolation and refining, (5) cascade-wise utilization and practical application of biomass in Asia, (6) exploration and utilization of microbial resources in Tropical Asia, (7) evaluation of biological resources existing in Southeast Asia and construction of information network, (8) development and evaluation of cultured articular cartilage, (9) technology for utilizing wastewater for production of valuable substances, and (10) studies for utilizing biological resources through utilization of diversity of symbiotic microbes and their adaptability to surroundings. Under item (1), it was planned that ultrasonic micro transducers and micro fluid devices be developed for use in the medical field. (NEDO)

  15. FY 1998 international cooperation project for global environment/project to evaluate influence of climate change; 1998 nendo chosa hokokusho. Chikyu kankyo kokusai kyoryoku jigyo/kiko hendo eikyo hyokanado jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    As a part of the international cooperation for the global warming problem, evaluation/study were conducted on policy to lessen climate changes from viewpoints of scientific technology, environment, and economy/society. In the development of evaluation methods on cost analysis, the following were pointed out: Changes in resource utilization brought about as a result of the policy are all needed to be numerated; In resource, clean air and water, and also abolition of price barrier and prices now in force are included. As subjects on the technology transfer, cited are barriers in aspects of organization/system and barriers in aspects of economy/finance and society. Especially, it was pointed out that it is necessary to exchange the persons concerned in the industrial sector. Of various optional policies toward the prevention of global warming, the Kyoto mechanism not only has an economical merit of the use of low cost option but can be fairly promising from an environmental viewpoint of internationally controlling the greenhouse effect gas emission, if the characteristic of practically using the market can be so designed that it fulfills its function. (NEDO)

  16. Report on a project to support promotion of forming an environmentally friendly energy community. Survey on an environmentally friendly community business by means of high-efficiency wastes power generation system in the Toyota-Kamo wide area; Kankyo chowagata energy community keisei sokushin hojo jigyo chosa hokokusho. Toyota Kamo koikiken kokoritsu haikibutsu hatsuden kankyo chowagata energy community jigyo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Taking the Toyota-Kamo wide area as the object, wastes power generation is positioned over the society system as worked on by administrations and operators integrally to incinerate mixedly those incineratable materials such as plastics among general and industrial combustible wastes for high-efficiency generation of power, which is supplied to electric utility operators as surplus power. Discussions were given on the business feasibility and the effectiveness as a society system. In this area, the mixed model B plan (dealing with general wastes plus industrial wastes) was evaluated as an effective plan as the society system. This is because the plan has effect to incinerate, melt and generate power from industrial wastes which have been used for land-fill, effect of improving the power generation efficiency, and effectiveness of mixed treatment with general wastes. The plan A in which general wastes are made into RDF, then incinerated mixedly with industrial wastes for power generation was evaluated to have high reliability potential of power supply and to be an effective plan as a society system, if effect can be expected to reduce transportation energy as a result of making the system large enough and turning wastes into RDF. (NEDO)

  17. FY 1991 report on the survey of geothermal development promotion. Electromagnetic exploration (High accuracy MT method) (No.38 - West area of Mt. Aso); Chinetsu kaihatsu sokushin chosa chijo chosa hokokusho futai shiryo. 1991 nendo chinetsu kaihatsu sokushin chosa - Denji tansa (Koseido MT ho) hokokusho (No.38 Asosan seibu chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-12-01

    As a part of the survey of geothermal development promotion in FY 1991, electromagnetic exploration by the high accuracy MT method was conducted to acquire the information on the geothermal structure in the west area of Mt. Aso, Kumamoto Prefecture. The electromagnetic exploration was made in the area of about 65km{sup 2} at 52 measuring points for 3 measuring components in the magnetic field/2 measuring components in the electric field at 20 measuring frequencies or more in the range of 0.01Hz-20kHz for 4 hours or more. As a result of the survey, the resistivity structure indicated a 3-layer structure inside the Aso caldera. It was thought that the lowest layer was correspondent to the geological basement (Pre-tertiary system). As to the resistivity discontinuous lines extracted from sudden changes in depth distribution and resistivity distribution of the resistivity basement, those in NS direction are conspicuous and those in EW direction also exist inside the caldera. Around the part where these resistivity discontinuous lines of both NS and EW systems cross each other inside the caldera, the Yunoya hot spring and Tarutama hot spring which indicate the geothermal manifestation are located, and acid alteration zones were seen on the earth's surface in the periphery. (NEDO)

  18. FY 1997 basic survey project (database construction project) for enhancing energy consumption efficiency in developing countries; 1997 nendo hatten tojokoku energy shohi koritsuka kiso chosa jigyo. Database kochiku jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    NEDO is promoting a database construction project to collect and supply various technical/systematical information on energy related data and energy effective utilization. In FY 1997, about the Philippines, Indonesia and China, the data collected in a year were renewed, and seminar/workshop were held as a part of the promotion activities. About Thailand, Malaysia, Korea, Taiwan and Japan, Japan has independently been collecting the data. Also in FY 1997, Japan arranged the existing data and arranged/collected the data. About Vietnam, India, Myanmer and Pakistan, which became the objects for the project newly in FY 1996, the state of data arrangement was confirmed and the data were collected. Moreover, functional improvement of the system was made so that each country can use the database more easily and maintain the data independently. (NEDO)

  19. Report on the geothermal development promotion survey. No.B-7. Kuwanosawa area; Chinetsu kaihatsu sokushin chosa hokokusho. No. B-7 Kuwanosawa chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    The paper summed up the results of the geothermal development promotion survey B 'Kuwanosawa area' which was carried out in Yuzawa city, Akita prefecture, from FY 1998 to FY 1999. In the survey, the following were conducted for the comprehensive analysis: geology/alteration zone survey, gravity exploration, electromagnetic exploration, environmental effect survey, well geology survey by drilling structural boreholes of N11-KN-1 and N12-KN-2, cuttings test, temperature log, temperature recovery test, electrical log, water injection test, etc. The geology in the Kuwanosawa area is composed of Pre-neogene period basement rocks, Neogene system and Quaternary system. In this area, there were recognized no gush of geothermal fluids such as hot spring and fumarolic gas and no obvious geothermal manifestation such as high-temperature places and new geothermal alteration zones. Around N12-KN-2, there exists the geothermal water with comparatively high-temperature/high-Cl concentration which is similar to that in the Wasabizawa area, but how it flows is unknown because there was no lost circulation in the depths of the borehole. Around N11-KN-1, there exists the low-temperature/low-Cl concentration geothermal water originating in meteoric water, and therefore, the area can be a rechargeable area. The Kuwanosawa area is regarded as the periphery of the Wasabizawa-Akinomiya geothermal area. (NEDO)

  20. Report on the geothermal development promotion survey. No.34. Kaminoyu/Santai area; Chinetsu kaihatsu sokushin chosa hokokusho. No. 34 Kaminoyu Santai chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    The paper summed up the results of the geothermal development promotion survey 'Kaminoyu/Santai area' which was carried out at Yakumo town, Yamakoshi county, and Mori town, Kayabe county, Hokkaido, from FY 1990 to FY 1992. In the survey, the following were conducted for the comprehensive analysis: surface survey such as geology/alteration zone survey, geochemical survey and gravity exploration, test to induce jetting of geothermal fluids by drilling 7 boreholes, temperature/pressure log, etc. The geological structure of this area is featured by the uplift structure/caldera structure and the anticline structure. In the wide-area geothermal system, it is thought that the low-temperature seawater permeates underground by mixture with meteoric water, is heated, and forms the deep geothermal water. It is thought that the hot spring water in this area is stored in the hot spring reservoir by mixture with the surface water, and it is gushing. In the area, the region which is regarded as favorable as passage/storage place of geothermal fluid is a region of 1.5km width extending linearly in the E-W direction from the Nigorikawa basin to Kaminoyu. Further, it is thought that fractures were unfavorably developed in the Santai/Kaminoyu area. (NEDO)

  1. Report on the geothermal development promotion survey. No.C-3. Akinomiya area; Chinetsu kaihatsu sokushin chosa hokokusho. No.C-3 Akinomiya chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The paper summed up the results of the survey of the geothermal development promotion survey - Akinomiya area which was carried out in Yuzawa City and Ogachi Town, Akita Prefecture, from FY 1996 to FY 1999. In the survey, the following were conducted: surface survey such as the geological alteration zone survey, fluid geochemical survey, gravity survey and electromagnetic exploration, logging by drilling 8 boreholes, jetting test, etc. Further, using the data obtained from these, analysis was made of geology/reservoir structure, thermal structure, hydraulic structure, etc. As a result, grasped were the distribution of the main underground fracture structure and the distribution of promising high-temperature zones. In the short-term/long-term jetting test, a total steam amount of 124 t/h was confirmed. Moreover, there was the pressure interference between the geothermal reservoir in the Akinomiya area and the geothermal reservoir in the Wasabizawa area, and it was confirmed that there was the hydraulic relation between those reservoirs. Further, it was assumed that there was not so much effect on hot spring reservoirs in the Akinomiya area. In the simulation of production prediction, the result was obtained that there was a possibility of power generation of 30MW only in the Akinomiya area and of 60MW both in the Akinomiya area and the Wasabizawa area. (NEDO)

  2. Report on the geothermal development promotion survey. No.C-2. Wasabizawa area; Chinetsu kaihatsu sokushin chosa hokokusho. No.C-2 Wasabizawa chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The paper summed up the results of the survey of the geothermal development promotion survey - Wasabizawa area which was carried out in Yuzawa City and Ogachi Town, Akita Prefecture, from FY 1993 to FY 1996. In the survey, the following were conducted: surface survey such as geological alteration zone survey, fluid geochemical survey, gravity survey and electromagnetic exploration, temperature log by drilling 9 exploration wells, short-term/long-term jetting test, etc. Further, using the data obtained from these, analysis was made of geology/reservoir structure, thermal structure, geothermal water/hydraulic structure, geothermal system models, etc. As a result, a high-temperature (about 300 degrees C) zone promising as the geothermal development area was picked out, and the existence was confirmed of a dominant geothermal reservoir around the fault. In the jetting test, a total steam amount of 111.6 t/h was confirmed, and from the reservoir simulation, the result was obtained that there was a high possibility of 30-year power generation of 30MW/y. As a result of studying 'a power generation system by small-scale unit serial development' considering regional characteristics in the Wasabizawa area, the power generation cost (sending end, 15-year average) was estimated at approximately 9-10 yen/kWh. (NEDO)

  3. Report on the geothermal development promotion survey. No.C-2. Wasabizawa area; Chinetsu kaihatsu sokushin chosa hokokusho. No.C-2 Wasabizawa chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The paper summed up the results of the survey of the geothermal development promotion survey - Wasabizawa area which was carried out in Yuzawa City and Ogachi Town, Akita Prefecture, from FY 1993 to FY 1996. In the survey, the following were conducted: surface survey such as geological alteration zone survey, fluid geochemical survey, gravity survey and electromagnetic exploration, temperature log by drilling 9 exploration wells, short-term/long-term jetting test, etc. Further, using the data obtained from these, analysis was made of geology/reservoir structure, thermal structure, geothermal water/hydraulic structure, geothermal system models, etc. As a result, a high-temperature (about 300 degrees C) zone promising as the geothermal development area was picked out, and the existence was confirmed of a dominant geothermal reservoir around the fault. In the jetting test, a total steam amount of 111.6 t/h was confirmed, and from the reservoir simulation, the result was obtained that there was a high possibility of 30-year power generation of 30MW/y. As a result of studying 'a power generation system by small-scale unit serial development' considering regional characteristics in the Wasabizawa area, the power generation cost (sending end, 15-year average) was estimated at approximately 9-10 yen/kWh. (NEDO)

  4. Report on the geothermal development promotion survey. No.B-7. Kuwanosawa area; Chinetsu kaihatsu sokushin chosa hokokusho. No. B-7 Kuwanosawa chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    The paper summed up the results of the geothermal development promotion survey B 'Kuwanosawa area' which was carried out in Yuzawa city, Akita prefecture, from FY 1998 to FY 1999. In the survey, the following were conducted for the comprehensive analysis: geology/alteration zone survey, gravity exploration, electromagnetic exploration, environmental effect survey, well geology survey by drilling structural boreholes of N11-KN-1 and N12-KN-2, cuttings test, temperature log, temperature recovery test, electrical log, water injection test, etc. The geology in the Kuwanosawa area is composed of Pre-neogene period basement rocks, Neogene system and Quaternary system. In this area, there were recognized no gush of geothermal fluids such as hot spring and fumarolic gas and no obvious geothermal manifestation such as high-temperature places and new geothermal alteration zones. Around N12-KN-2, there exists the geothermal water with comparatively high-temperature/high-Cl concentration which is similar to that in the Wasabizawa area, but how it flows is unknown because there was no lost circulation in the depths of the borehole. Around N11-KN-1, there exists the low-temperature/low-Cl concentration geothermal water originating in meteoric water, and therefore, the area can be a rechargeable area. The Kuwanosawa area is regarded as the periphery of the Wasabizawa-Akinomiya geothermal area. (NEDO)

  5. Report on the geothermal development promotion survey. No.34. Kaminoyu/Santai area; Chinetsu kaihatsu sokushin chosa hokokusho. No. 34 Kaminoyu Santai chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    The paper summed up the results of the geothermal development promotion survey 'Kaminoyu/Santai area' which was carried out at Yakumo town, Yamakoshi county, and Mori town, Kayabe county, Hokkaido, from FY 1990 to FY 1992. In the survey, the following were conducted for the comprehensive analysis: surface survey such as geology/alteration zone survey, geochemical survey and gravity exploration, test to induce jetting of geothermal fluids by drilling 7 boreholes, temperature/pressure log, etc. The geological structure of this area is featured by the uplift structure/caldera structure and the anticline structure. In the wide-area geothermal system, it is thought that the low-temperature seawater permeates underground by mixture with meteoric water, is heated, and forms the deep geothermal water. It is thought that the hot spring water in this area is stored in the hot spring reservoir by mixture with the surface water, and it is gushing. In the area, the region which is regarded as favorable as passage/storage place of geothermal fluid is a region of 1.5km width extending linearly in the E-W direction from the Nigorikawa basin to Kaminoyu. Further, it is thought that fractures were unfavorably developed in the Santai/Kaminoyu area. (NEDO)

  6. Report on a regional new energy vision establishment in Yatsuka Township; Yatsukamachi chiiki shin energy vision sakutei jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Surveys and discussions were given on establishing a new energy vision in Yatsuka Township in Shimane Prefecture. For the survey on available amount of natural energies (sunlight and wind), all-weather insolation required for solar energy power generation was analyzed by using the NEDO information, and wind was analyzed based on observations at Matsue Meteorological Observatory, Sakai-minato Observatory, and Nakaura Water Gate. In discussing the system, power generation amount in the Matsue area was estimated for the case when solar cells of single crystal silicon plus amorphous hybrid type HIP-H48B1 are used. For wind power generation, power generation amount was calculated from observation values derived at the Nakaura water gate when wind mills with diameters from 2 to 10 m are used. Furthermore, calculations were performed on power amount generated uniformly by using a hybrid system using solar energy power generation and wind power generation. As a result of the discussions, a plan was established to introduce the new energies by means of a solar and wind energy hybrid power generation system to the greenhouse 'Green Stellar' symbolizing the Japan's largest peony production, being capable of year-round peony cultivation. The system is planned to be introduced to the town office building and other public organizations sequentially according to annual programs. (NEDO)

  7. Fiscal 1999 technical survey report. Cooperative project on energy conservation seminar; 1999 nendo sho energy seminar kyoryoku jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    NEDO (New Energy and Industrial Technology Development Organization), from the viewpoint that the development and popularization of energy conservation technologies are extremely important as energy conservation measures, collected energy related primary information from 12 Asian countries including Japan for the development and popularization of energy conservation technologies, and has constructed a database NEDO/DB. NEDO is now propelling forward its efforts to popularize the database. For popularizing NEDO/DB in Vietnam and for rendering the people conscious of energy conservation, NEDO dispatched some lecturers to an energy conservation seminar sponsored by the Vietnamese Government. The importance of energy conservation promoting measures was highlighted at the seminar. NEDO's approach to AIJ (activities implemented jointly) and CDM (clean development mechanism) was described at the seminar, and a lecture meeting was held to explain NEDO/DB and to teach how to use the database. (NEDO)

  8. Report on a survey in fiscal 1999. International study exchange project; 1999 nendo kokusai kenkyu koryru jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Exchange with overseas researchers and research organizations has important significance in promoting research and development toward creating new research areas and structuring new technological systems intended for solving global environment problems. In cooperation with RITE and RITE researchers and relevant learned societies, researchers were invited or dispatched to international conferences and international symposiums with regard to global environment related technologies. In addition to interaction with major overseas research institutions and universities, medium and long-term dispatch and invitation have been performed that are considered to play an important role in future research exchange activities based on the achievements of short-term invitations and dispatches and examinations with potential research exchanges. As a result, domestic and overseas interactions on the latest researches were performed, while basic and applied researches related to global environment technologies are being proceeded also in various areas of studies outside the country. It was identified that these exchange activities have close relationship with research and development of industrial technologies serving for global environment preservation, which are being promoted by RITE. (NEDO)

  9. Fiscal 2000 coal engineer training project. Report on senior course; 2000 nendo sekitan gijutsusha yosei jigyo jokyu course hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The above-named course consisted of three weeks of lectures and three months of visits to coal mines and harbor facilities and tours to coal consumers such as power stations and steel manufacturing plants. The report has turned out to be an introductory manual on coal mining consisting of coal mining technologies such as coal resource exploration, coal mining, and coal preparation, and the state of Australian coal industry. The manual comprises (1) job training in Japan (attendance at lectures), (2) inspection and training in Japan (coal consumers), (3) intensified lectures at University of New South Wales (coal mining and preparation), (4) current state of Austrian coal industry, (5) inspection tours to Australian coal mines, (6) inspection tours to Australian harbor facilities, and (7) the state of Australian coal mine management. Fifteen intensified lectures were given, including the 'Overview of Australian coal industry' and 'Coal handling and transport.' Nine coal mines were visited in Queensland, and 21 in New South Wales. As for the state of Australian coal mine management, there is a trend toward contract mining but self-mining constitutes the mainstream. (NEDO)

  10. Report on survey for high-performance industrial furnace introduction field test project in fiscal 1999. Activities to promote proliferation of the introduction to subject project related business entities; 1999 nendo koseino kogyoro donyu field test jigyo chosa hokokusho. Taisho jigyosha eno fukyu sokushin katsudo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper reports the survey on high-performance industrial furnace introduction field test project in fiscal 1999. The development of a high-performance industrial furnace having been performed by NEDO since fiscal 1993 has completed the fundamental development research in fiscal 1998, and the planned achievements were verified (large energy saving, reduction of NOx emission, and down-sizing). Upon the result, the introduction field test project has started in fiscal 1998 for three years until fiscal 2000. The number of research items adopted in fiscal 1998 was 58, and those in fiscal 1999 was 51, which are progressing smoothly at the present. Reduction in CO2 emission of 50,000 tons was demonstrated as the achievement in fiscal 1998, and NOx emission realized the regulation value or lower in cities wherein each operator is executing the project. Several cases of down-sizing were also reported. In the proliferation promoting project in fiscal 1998, activities were made mainly to the subject project related business entities in relation with the development achievements and general technologies for the high-performance furnace. In fiscal 1999, communication transmission was continued by using information tools on introduction of the achievements and technologies. Attempts will be made on promoting the proliferation of the field test project in the future through a number of technology lecture meetings performed by specialists. (NEDO)

  11. Fiscal 1989 geothermal development promotion survey report. Data sampled by ground based survey and attached to the report (Electromagnetic surveillance - TDEM - No. 32. Hachijo Island region); Chinetsu kaihatsu sokushin chosa chijo chosa hokokusho futai shiryo. 1989 nendo chinetsu kaihatsu sokushin chosa denji tansa (TDEM ho) hokokusho (No. 32 Hachijojima chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-11-01

    A TDEM (time domain electromagnetic) surveillance was conducted for the Hachijo Island region, Tokyo. The survey covered a 70 km{sup 2} area, with 81 observation stations. There was a distance of 1 km or more between transmission electrodes, the signal was a rectangular wave with a cycle of 16 seconds or more, the sending current was 60 A or more, and the shortest distance between a transmission electrode and an observation station was 2.5 km or more. A subsurface structure model was proposed after the analysis of the collected data, which is described below. In the Mt. Nishiyama district, the deep-seated magnetic substance, high-conduction zone, and the low gravity anomaly zone were found to be roughly equal to each other in terms of distribution. It is inferred that the low gravity anomaly results from reduction in resistivity by the progress of fractioning of rocks due to the intrusion of a magnetized rock into the depth and from mass defect due to volcanic eruption. In the Mt. Higashiyama district, a high density rock intrudes in the ENE-WSW direction for the creation of a high gravity anomaly belt, and it is inferred that alteration occurred along the southern rim of the belt, that magnetic substance was produced in the cavity-abundant portion, and that a volcano with several craters rose at the middle of the portion. (NEDO)

  12. Survey report. New energy vision formulation project for Osa Town, Okayama Prefecture; 2001 nendo Osa cho shin energy vision sakutei tou jigyo chosa hokokusho. Chiiki shin energy vision sakutei tou jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    A New Energy Vision was formulated for Osa Town after investigations about energy demand, new energy reserves, and their available amounts. The town consumes approximately 50.6-billion kcal in total, with automobiles consuming a half thereof as fuel. Studies were made about new energy reserves and recoverable amounts in the town, and then an estimation was made that 16.2 times 10{sup 5} kWh/year would be recoverable from photovoltaic energy, 1.58 times 10{sup 5} kWh from small-scale hydropower, 8.79 times 10{sup 6} kWh from ligneous biomass, and 1.96 times 10{sup 5} kWh from livestock biomass, and that 40 MW, for example, would come from wind power, subject to change depending on the wind power generator system to be built. Projects for new energy introduction were discussed, which involved the use of biodiesel fuel for official vehicles, installation of solar hot water showers in primary and junior high schools, application of photovoltaic/wind power to crime prevention lights and street lamps, snow melting systems for roads utilizing geothermal energy, use of heat from thinnings and ligneous waste, wind power facilities, small-scale hydropower facilities, introduction of new energy appliances into sightseeing facilities, and the introduction of photovoltaic power or the like into public facilities. (NEDO)

  13. Fiscal 1997 research report. Basic research project on improving energy consumption efficiency in developing countries (Database construction); 1998 nendo hatten tojokoku energy shohi koritsuka kiso chosa jigyo hokokusho. Database kochiku jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    The New Energy and Industrial Technology Development Organization (NEDO) in fiscal 1993 started a database construction project, which involves energy conservation related primary information on the 11 countries concerned, for encouraging 11 Asian countries, namely, Japan, China, Indonesia, the Philippines, Thailand, Malaysia, Taiwan, Korea, Vietnam, Myanmar, and Pakistan, to promote their energy conservation endeavors. As part of the database construction effort under this research project, the so-far accomplished collection of and analysis into energy related information about the countries, surveys of the utilization and popularization of databases, and development of database systems are taken into consideration. On the basis of these efforts to improve on the database systems for enhanced operability, a program is formulated for database diffusion under which data are collected and updated for storage in databases. Also exerted under the program are endeavors to make use of the above-said database systems and to disseminate the constructed databases into the 11 countries for effective utilization. In the future, it is desired that the NEDO database will win popularity in the 11 countries and be utilized in their formulation of domestic energy conservation policies. (NEDO)

  14. Report on the geothermal development promotion survey. No.B-6. Mt. Tsujinodake area; Chinetsu kaihatsu sokushin chosa hokokusho. No. B-6 Tsujinodake chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The paper summed up the results of the geothermal development promotion survey B 'Mt. Tsujinodake area' which was carried out at Yamagawa town, Ibusuki county, Kagoshima prefecture, from FY 1997 to FY 1999. In the survey, the following were conducted: surface survey such as geology/alteration zone survey, fluid geochemical survey, gravity exploration and electromagnetic exploration, and geothermal fluid survey by drilling 4 structural testing boreholes. In the Mt. Tsujinodake area, active fumarolic activities are still now continuing around the Unagi hot spring in the north, and the acidic alteration zone is distributed in the peripheral surface area. In Borehole N11-TD-2 in the north, it is assumed that there exists the hydrothermal bed of a temperature of approximately 230 degrees C in the depth of 400-800m, which is comparatively shallow, and that the stored geothermal water flows laterally. In the central area, a hydrothermal bed of a temperature of approximately 130 degrees C was confirmed in N11-TD-1, but it is judged that chances of the existence of high temperature hydrothermal bed are not very good. In N11-TD-3 in the south, the existence of promising heat sources is expected in the deeper part since the remarkable alteration was seen in the depth of 1,435m or deeper, and the sharp rise in temperature was recognized. (NEDO)

  15. Report on the geothermal development promotion survey. No.38. Mt. Aso West area; Chinetsu kaihatsu sokushin chosa hokokusho. No. 38 Asozan seibu chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    The paper summed up the results of the geothermal development promotion survey 'Mt. Aso West area' which was carried out at Choyo village and Kugino village, Aso county, and at Otsu town, Kikuchi county, Kumamoto prefecture, from FY 1991 to FY 1994. In the survey, the following were conducted for the comprehensive analysis: surface survey such as geology/alteration zone survey, geochemical survey and high precision MT method survey, and temperature log, electrical log, water injection test, core test and hydrothermal survey by drilling 7 structural boreholes. In the numerical analysis of thermal structure models, the present geothermal manifestation was obtained, assuming that the past magma reservoir in a state of agglomeration/semi-agglomeration exists in the depths of caldera and that the depth is set at 4km. It is assumed that the deep hydrothermal reservoir around Yunoya/Tarutama exists around the depth of 500-600m below sea level and that the temperature is 230-300 degrees C. The meteoric water permeating into the depths forms high-temperature reservoirs around Yunoya/Tarutama. The reservoir rises up to about 400m below sea level to become a vapor-dominated phase. It forms an acidic SO{sub 4} type reservoir phase around the earth surface. (NEDO)

  16. Report on the geothermal development promotion survey. No.38. Mt. Aso West area; Chinetsu kaihatsu sokushin chosa hokokusho. No. 38 Asozan seibu chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    The paper summed up the results of the geothermal development promotion survey 'Mt. Aso West area' which was carried out at Choyo village and Kugino village, Aso county, and at Otsu town, Kikuchi county, Kumamoto prefecture, from FY 1991 to FY 1994. In the survey, the following were conducted for the comprehensive analysis: surface survey such as geology/alteration zone survey, geochemical survey and high precision MT method survey, and temperature log, electrical log, water injection test, core test and hydrothermal survey by drilling 7 structural boreholes. In the numerical analysis of thermal structure models, the present geothermal manifestation was obtained, assuming that the past magma reservoir in a state of agglomeration/semi-agglomeration exists in the depths of caldera and that the depth is set at 4km. It is assumed that the deep hydrothermal reservoir around Yunoya/Tarutama exists around the depth of 500-600m below sea level and that the temperature is 230-300 degrees C. The meteoric water permeating into the depths forms high-temperature reservoirs around Yunoya/Tarutama. The reservoir rises up to about 400m below sea level to become a vapor-dominated phase. It forms an acidic SO{sub 4} type reservoir phase around the earth surface. (NEDO)

  17. Fiscal 1999 research report. Survey on geothermal development sites (Survey on natural environment); 1999 nendo chinetsu kaihatsu sokushin chosa. Shizen kankyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This report summarizes the result on selecting sites for large-caliber production wells, and landscape characteristic evaluation for simulation, based on the landscape survey on C candidate site for geothermal development. Field survey was made on landscape, plants and animals in the Kirishima Eboshidake area. It was clarified that this area has diverse flora including some rare species such as rein orchid and monkshood which are listed as endangered species. In addition, not a few epiphytes were identified. The zoological survey result showed that planted forests of evergreen coniferous trees which cover a wide range of the surveyed area, and peripheral grassland, scrub and natural forests provide good habitats for mammals such as sika deer and wild boars. On the other hand, no animal species in need of special protection were found. Geologically some traces of landslide occurrence in the past were detected in the northern part of the surveyed area relatively. As the survey result, some promising sites suitable for geothermal development were selected, which are judged to have a relatively small impact on natural environment and landscape. (NEDO)

  18. Investigation report on promotion of geothermal development. No. A-4, Mt. Kunbetsu area; Chinetsu kaihatsu sokushin chosa hokokusho. No.A-4 Kunbetsudake chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    This paper summarizes the results of investigations in the Mt. Kunbetsu area out of the investigations on promotion of geothermal development having been performed during the period from 1998 to 1999. The investigated area is an area located in the eastern Hokkaido with an area of about 300 km{sup 2}. The wide area investigation has discussed possibilities of existence of geothermal resources mainly from existence of high-temperature anomalies. The investigation has performed the following activities: fluid geochemical investigations on ten spring water sources, three spring gas sources, and five surface water points; gravity exploration at 153 measuring points; electromagnetic exploration at 52 measuring points; excavation of two heat flow rate wells (to depths of 997m and 995m), temperature logging, core cuttings tests, thermal hot water survey; other fluid inclusions tests, rock alteration age measurement; and temperature logging at Ryuun Shiretoko Spa. As a result of the investigations, it was estimated that, as the geothermal system model, the heat source is assumed to exist at a great depth below Mt. Kaibetsu; the spring water and the mineral spring water show diverse spring qualities because of mixing of meteoric water with fossil sea water; the fossil sea water and the meteoric water have been heated by thermal conduction; and the high-temperature zone is not spread to the positions of the investigation wells. (NEDO)

  19. New energy vision of the Gushikami Village area; 2001 nendo Gushikami son chiiki shin energy vision sakutei tou jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For the purpose of promoting the introduction of new energy and enhancing the awareness of it in Gushikami Village, Okinawa Prefecture, an investigational study was conducted of the energy demand of the village, existence amount of new energy, plan for new energy introduction, etc., and a vision was worked out. The energy demand of Gushikami Village was estimated at 640.2 x 10{sup 6} MJ/y. By sector, it consisted of 37.1% in the transportation sector, 32.0% in the commercial/residential sector and 30.8% in the industrial sector. The rate of energy source was 73.7% of petroleum-base fuel and 26.3% of electric power. As the plan for new energy introduction, the following were studied: introduction of photovoltaic power generation to the village office/museum/elementary school/junior high school, introduction of solar heat utilization facilities to the meal providing center/gymnasium, introduction of wind power generation to the sports park, project of wind power generation on the sugar cane hill (600kW x 6 turbines), cogeneration by composting of stockbreeding waste and methane, introduction of clean energy car to official vehicle, introduction of natural gas vehicle, installation of experimental plant for conversion of sugar cane to methanol, etc. (NEDO)

  20. FY 2001 report on the coal engineer training project. Advanced course; 2001 nendo sekitan gijutsusha yose jigyo. Jokyu kosu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    The paper summed up the details of the training in the coal engineer training project (advanced course) carried out in FY 2001. The term of training was from June 1 to November 14, 2001. In the business training, lectures were given on coal geology, coal exploration technology, coal mining technology, draft survey, coal sampling and analysis method, maritime freight transport mainly of coal, coal utilization technology, environmental protection technology related to coal utilization, projects on overseas coal development, physical properties/chemical characteristics and usage of coal, and coal situation in China. In the inspection training, inspectional visits were paid to Taiheiyo Coal Mining Co., Noshiro Power Plant of the Tohoku Electric Power Co., Kumagaya Plant of Taiheiyo Cement Corp. and Keihin Steelworks of NKK Corp. In the training overseas, inspectional visits were paid to the following in Australia: coal mines of Moonee, Rix's Creek, West Wallsend, Bloomfield, Beltana, Bulga, South Bulga, Mt. Thorley, Warkworth, Liddell, Wambo, Mount Owen, Camberwell, etc. and harbors of Port Newcastle, Port Kembla Coal Terminal, etc. (NEDO)

  1. FY 2000 report on the promotion projects by Research Institute of Innovative Technology for the Earth. Projects for international research exchanges and international seminars; 2000 nendo chikyu kankyo sangyo gijutsu kaihatsu suishin jigyo chosa hokokusho. Kokusai kenkyu koryu jigyo / kokusai seminar kaisai jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Described herein are the results of the international research exchange projects promoted by Research Institute of Innovative Technology for the Earth (RITE) in FY 2000. The international research exchanges are important for creation of new research areas and technological systems for solving the global environmental problems. In order to promote these activities, RITE invites and dispatches researchers to international conferences and symposiums, promotes research exchanges with major foreign research institutes and academic organizations, and invites and dispatches researchers for medium to long periods. These projects promote exchanges of the latest researches with various institutes, both domestic and foreign, and confirm that the research and development projects now RITE is promoting are closely related to those promoted by various organizations. In the FY 2000, RITE invites 5 foreign researchers for joint researches, and invites 3 foreign researchers to international conferences. RITE also dispatches 3 Japanese researchers to American and European universities, and 12 Japanese researchers to international conferences and the like, to effectively promote the domestic researches and grasp development tendencies at institutes of various countries. RITE holds 5 international seminars for exchanging and discussing broad topics over advanced researches related to global environmental technologies by researchers, both domestic and foreign. (NEDO)

  2. FY 1991 report on the survey of geothermal development promotion. Attached data. Electromagnetic exploration (High accuracy MT method) (No.38 - West area of Mt. Aso); Chinetsu kaihatsu sokushin chosa chijo chosa hokokusho futai shiryo. 1991 nendo chinetsu kaihatsu sokushin chosa - Denji tansa (Koseido MT ho) hokokusho (No.38 Asosan seibu chiiki - Tenpu shiryo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-12-01

    As a part of the survey of geothermal development promotion in FY 1991, electromagnetic exploration by the high accuracy MT method was conducted to acquire the information on the geothermal structure in the west area of Mt. Aso, Kumamoto Prefecture. The detailed data were arranged as the data attached to the report on the electromagnetic exploration. As the attached data, included were the results of the 1D analysis (measuring/analysis {rho}a-F chart, analytic structure drawing), results of the 1D analysis (numerical list of the apparent resistivity analytic value and inverse analytic value) and numerical list of the apparent resistivity measured value. (NEDO)

  3. Fiscal 2000 survey report on Asia/Pacific Regional Environment Problems Researcher Exchange Promotion Projects. Construction of Environmental Technology Research Network in the Asia/Pacific Region; 2000 nendo Asia Taiheiyo chiiki kankyo mondai kenkyusha koryu sokushin jigyo hokokusho. Asia/Taiheiyo chiiki kankyo gijutsu kenkyu kaihatsu network kochiku chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of developing and popularizing environment conservation technologies in the Asia/Pacific region, activities were conducted for Environmental Technology Research Network in the Asia/Pacific Area (ETERNET-APR). In this fiscal year, under the motto of Expansion of International Collaborative Researches on Environmental Technology, a 7th international workshop was held in Yokkaichi City, Mie Prefecture, with the attendance of approximately 60 people in Japan and from abroad. Researchers from overseas, in addition, attended a 10-day training program at the National Institute for Resources and Development and others in preparation for the embodiment of international collaborative research. A survey was conducted overseas for the promotion of database utilization and registration and for grasping the problems intrinsic to the respective research institutes and problems to occur at every stage of development. People's Republic of China was visited, where a miniscale workshop was held, study tours were made, and opinions were exchanged. It was actually felt, at the places that were visited, that ETERNET-APR was certainly in function in various fields. (NEDO)

  4. Geothermal development promotion survey report. No. 28. Eastern part of Obanazawa region; 1988-1990 chinetsu kaihatsu sokushin chosa hokokusho. No. 28 Obanazawa tobu chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    The results of surveys conducted in the eastern part of Obanazawa region, Yamagata Prefecture, in fiscal 1988-1989 are compiled in this report. Conducted were a geological/alteration zone survey, geochemical survey, electromagnetic surveillance (TDEM - time domain electromagnetic method), gravity prospecting (review of gravity data), electric prospecting (Schlumberger method), heat flow rate survey, test boring, environmental impact survey, and so forth. Conclusions are mentioned below. It is inferred that the water of the Ginzan hot spring of the neutral Cl-SO{sub 4} type originates in meteoric water in mountains high above the mean sea level in the western side and that the hot spring water is produced when water heated to approximately 170 degrees C at a depth (1,500-2,000 meters below mean sea level) in the Ginzan hot spring district, where the ground temperature is the highest in this region, is diluted by groundwater near the surface at its ultimate stage of ascent. The survey results disclose that possibilities are quite low that a high-temperature sector of 200 degrees C or higher is found at a level not deeper than 2,000 meters from the ground surface. Accordingly, no geothermal development by flash steam power generation is feasible at the present stage at any economically acceptable depth. (NEDO)

  5. FY 1998 annual report on the geothermal development promotion survey. Report on landscape survey; 1998 nendo chinetsu kaihatsu sokushin chosa hokokusho. Shizen kankyo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Described herein are results of the natural environment surveys, carried out in the Shitanotai Region in Yuzawa City, Akita Pref., where Geothermal Development Promotion Survey C is scheduled. On-the-spot surveys, conducted from June to November, covered 3 items of landscape, vegetation and animals. The Shimonotai Region has a number of ponds and swamps, some of which are used as fields for Brasenia shreberi, and wet shield plant communities in places reflecting these environments. The zoological survey results show that moderate to dry deciduous forests of Japanese beeches (Fagus crenata) and Mongolian oaks (Quercus mongolica var. grossesserrata) in this region provide sound habitats for large mammalian wild animals, e.g., moon bears (Selenarctos thibetanus). For birds, there are some areas extracted indicating high possibility of being inhabited by honey buzzards (Pernis ptilorhyncus), which are listed as a near threatened species by the Environment Agency. Geologically, traces of landslide occurrence in the past have been detected widely, indicating need for more detailed investigation for land stability. These surveys have extracted several areas whose natural environments and landscapes are damaged relatively little by geothermal development. (NEDO)

  6. Survey report of FY 1997 on the global environmental industry technology development promotion project. International research exchange project; 1997 nendo chosa hokokusho. Chikyu kankyo sangyo gijutsu kaihatsu suishin jigyo (kokusai kenkyu koryu jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Exchange of personnel among foreign research organizations is significant for promoting research and development to create new research fields and to build new technological systems for the purpose of solving global environmental problems. For this purpose, researchers were sent/invited to/from international conferences and international symposiums related to global environmental technology and exchange of personnel with major foreign research organizations and universities was conducted under the cooperation of RITE and RITE-related researchers and related academic societies. Based on short-term invitation and sending of researchers as well as the feasibility study of researcher exchange, researchers were sent/invited on long- and mid-terms. As a result, exchange of personnel engaged in the latest research in Japan and overseas could be promoted. It was found that various researches are being conducted abroad in basic areas of global environmental technology. Since they are closely related to the research and development of industrial technology contributing to global environmental preservation promoted by RITE, it is important to establish a more efficient exchange system of researchers in the future. 91 refs., 38 figs., 14 tabs.

  7. Report for fiscal 2000 on joint seminar for coal engineer training project; 2000 nendo sekitan gijutsusha yosei jigyo godo semina hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    This paper summarizes the contents of the joint seminar for coal engineer training project in fiscal 2000, which has been held in Tokyo on September 25, 2000. The lectures included 'Coal Resources in Gunnedah Basin - Future Coal Supply Potential and Geophysical Exploration' by Ms. Julie Ann Moloney, senior geographical engineer at NSW Department of Mineral Resources, Australia, 'Human Resources Development for Coal Mining in Indonesia' by Mr. Bangun Usman Harahap at the Ministry of Mines and Energy in Indonesia, 'Queensland Rail, a strategic partner - linking Coal Producers to World Markets' by Mr. John Stuart Burrows at Coal Queensland Rail, Australia, and 'The export coal mines of western Canada - A review' by Mr. Ron Smyth, director BC Geological Survey Branch, Ministry of Energy and Mines, British Columbia, Canada. Questions and answers were exchanged actively for these lectures. (NEDO)

  8. Report on new energy vision establishment project in Higashi Naruse Village area; Higashinarusemura chiiki shin energy vision sakutei nado jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    A new energy vision was established in the Higashi Naruse Village in Akita Prefecture. The population of the village is continuing the decreasing trend since 1950 to 3,390 persons as of 2000. The annual energy demand in this village is about 320,000 GJ, accounted for by the consumer department at about 40%, the transportation department at about 36% and the industrial department at about 24%. The carbon dioxide emission amount therefrom is estimated 6,300 t-C annually. The expected usable quantity of new energies in the village would be available, in the decreasing order, in the wind power as the most promising source, forestry bio-mass, snow cold heat energy, agricultural bio-mass, and solar beam (heat). The total quantity would be 514,330 GJ annually in heat utilization, and 85,305 MWh in electric power. The new energy introducing project includes introduction of photovoltaic and wind power generation into Kurikoma Mountain Villa, introduction of wind power generation into the Junes skiing area and Oyanagi Natural Park, introduction of photovoltaic power generation and heat utilization into primary and middle schools, introduction of clean energy fueled automobiles into the village office, and introduction of photovoltaic power generation into general houses. (NEDO)

  9. Report on the FY 1999 project for training coal engineers. Advanced course; 1999 nendo sekitan gijutsusha yosei jigyo hokokusho. Jokyusha course

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This is a report on the training for coal technology which two Japanese engineers received in Australia. In Chapter 3 (Outline of Australia), they studied the national land, constitution of the national land, population, history, politics, economy and trade. In Chapter 4 (Coal geology), they read lecture data of university. In Chapter 5 (Outline of coal supply/demand), the coal export amount from Australia is 167 million tons. Steam coal of a little less than 50% is exported to Japan. In Chapter 6 (Coal mining technology), 100 million tons of NSW state and 100 million and 570 thousand tons of QLD state are mined by underground mining and open pit mining. Training was conducted on overburden/drilling/transportation of the open pit mining coal. As coal mining methods of underground mining, they learned the board and pillar coal mining and high wall mining as an extension of open pit mining. In Chapter 7 (Coal preparation), they observed/studied the jig, heavy media separator, heavy media cyclone separator, flotation equipment, spiral ore dressing equipment, fine powder centrifugal dewatering equipment, thickener, sieve, etc. They studied by data or by observation in Chapters 8 (Outline of coal mine), 9 (Outline of export port), 10 (Outline of railroad transportation), and 11 (Quality management). (NEDO)

  10. FY 2001 report on the results of New Energy Adventure 2001 (advisory project); Shin ene adobencha 2001 (adobaizari jigyo) kekka hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    For the purpose of deepening the understanding of new energy by general citizens, 'Clean Energy Festa' was held in Asahikawa city, Hokkaido, Takamatsu city, Kagawa prefecture, and Kamimashiki county, Kumamoto prefecture. The campaign at station was conducted at Yamagata station, Hiroshima station, Ogura station, Takamatsu station, Kobe station and Sapporo station, and the following were also carried out in various places of Japan: new energy lessons, visits to new energy facilities, and delivery of lectures on new energy. The program of Clean Energy Festa included the Dejimon (popular character doll) show, new energy quiz show, exhibition of new energy information and quiz about new energy, solar car workshop for parent/child, exhibition booths prepared by companies, corner for test ride on clean energy car, etc. As to visits to new energy facilities, visits were paid to snow/ice energy facilities, waste fuel production facilities, wind power generation facilities, photovoltaic power generation facilities, etc. Concerning the delivery of lectures on new energy, lectures were given on new energy and global environment, global warming, etc. (NEDO)

  11. Report on the 1997 Coal Engineer Training Program General Course Training; 1997 nendo sekitan gijutsusha yosei jigyo ippan course kenshu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The paper reported training in the fiscal 1997 coal engineer training course. The training was made in a period from June 9 to November 12 in terms of actual training, English training, joint seminar, visits to the related facilities in Japan, overseas training, etc. for 10 engineers from mining companies, oil companies and electric power companies. In the actual training, the following lectures were given at International Resource University in Akita prefecture: coal exploration technology, coal situation of Australia, physical/chemical characteristics of coal and the application, coal preparation technology, coal situation in India, coal situation in the U.S., trend of general coal demand, coal situation in China, coal mining technology, actual surface mining technology, coal situation in Canada, commercial English, trend of raw coal demand, coal geology, environmental protection technology related to coal utilization, etc. Overseas training, which was divided into an Australia group and a Canada/America group, was conducted for about a month. Training in Indonesia was canceled because of a large scale forest fire which broke out immediately before the start. 88 figs., 52 tabs.

  12. Report for fiscal 2000 on joint seminar for coal engineer training project; 2000 nendo sekitan gijutsusha yosei jigyo godo semina hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    This paper summarizes the contents of the joint seminar for coal engineer training project in fiscal 2000, which has been held in Tokyo on September 25, 2000. The lectures included 'Coal Resources in Gunnedah Basin - Future Coal Supply Potential and Geophysical Exploration' by Ms. Julie Ann Moloney, senior geographical engineer at NSW Department of Mineral Resources, Australia, 'Human Resources Development for Coal Mining in Indonesia' by Mr. Bangun Usman Harahap at the Ministry of Mines and Energy in Indonesia, 'Queensland Rail, a strategic partner - linking Coal Producers to World Markets' by Mr. John Stuart Burrows at Coal Queensland Rail, Australia, and 'The export coal mines of western Canada - A review' by Mr. Ron Smyth, director BC Geological Survey Branch, Ministry of Energy and Mines, British Columbia, Canada. Questions and answers were exchanged actively for these lectures. (NEDO)

  13. Fiscal 1999 survey report. Project of promoting international cooperation on global environments/Project of assessing climate change impacts; 1999 nendo chikyu kankyo kokusai kyoryoku suishin jigyo chosa hokokusho. Kiko hendo eikyo hyoka nado jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    As part of international cooperation concerning global warming, an assessment is conducted of climate change mitigating measures, from the viewpoints of technology, environment, economy, and community, in coordination with the IPCC (Intergovernmental Panel on Climate Change) 3rd working group responsible for energy policy and technological development. It aims to contribute to the preparation of a 3rd assessment report, and covers (1) the development of an assessment technique relating to cost analysis, (2) problems in the transfer of technology and solutions for them, and (3) the assessment of various policy options. Under item (1), studies are made about modelling techniques, common parameters and their values, potentials for effect, control of warming, etc. Under item (2), factors impeding the transfer and diffusion of technology are extracted and solutions therefor and the establishment of new incentives are deliberated, with analysis and investigation focused on tasks and solutions for furthering global transfer of technology with attention paid to various specific cases. Under item (3), concrete and feasible policy options are discussed on the basis of the outcome of the above-named endeavors, in view of characteristics of each of the regions, departments, and techniques. (NEDO)

  14. Fiscal 1999 geothermal energy development promotion survey. Report on resource assessment for Shiramizugoe area; 1999 nendo chinetsu kaihatsu sokushin chosa hokokusho. Shiramizugoe chiiki shigen hyoka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Under an assumed plan of building a geothermal power station in the Shiramizugoe area of Makizono-cho, Aira-gun, Kagoshima Prefecture, investigations will be conducted under a 4-year program into the amount of geothermal resources, the dimensions and cost performance of a geothermal power station under consideration, and the environmental impact that the locating of such will incur, through for example identifying areas containing geothermal reservoirs suitable for geothermal power generation. In fiscal 1999, activities were conducted in the three fields of (1) survey plan preparation, (2) comprehensive analysis, and (3) environmental assessment. Under item (1), a survey and coordination implementation plan was prepared, existing data were analyzed for the construction of geothermal models out of which a suitable geothermal structure was specified for digging, and a list was drafted of locations for borehole digging for fiscal 2000. Under item (2), it was found that most of the past surveys covered the Ogiri area and that the Shiramizugoe area was but poorly covered. Discussion was made on the geological structure, geothermal structure, geothermal water hydraulic structure, and the geothermal water system. Under item (3), the plan was summarily explained to the local administration, associations of hot spring hotels, and inhabitants in the vicinity, and their consent was obtained. (NEDO)

  15. Geothermal development promotion survey. No.B-4 'Kuenohira-yama area'; 1997 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. No.B-4 Kuenohira-yama chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-01-01

    The above-named survey had been scheduled to be conducted in fiscal years 1996-1998 for an approximately 10km{sup 2}-large area of Kokonoe-cho, Kusu-gun, Oita Prefecture. In fiscal 1996, surface surveys were conducted, such as geological and alteration zone surveys, gravity prospecting, and electromagnetic survey. In fiscal 1997, an exploration well (N9-KH-1: depth 2,222.0m) was drilled. Since the maximum temperature in the well was found to be so low as 78.5 degrees C, the survey was given up in the second year. The survey conducted at N9-KH-1 showed that deep-seated and shallow-seated ruptures developed there in the absence of aquicludes, and so it was inferred that it was a recharge area, as predicted by the temperature logging profile, with surface water flowing into the depth. The above showed that there was no deep-seated blind geothermal system which the survey was after. Since it was not likely that the shallow-seated geothermal system located in the southern part of the Mizuwake pass would be found expanding into the area of the current survey, it was decided that the survey not be carried forward to the following fiscal year. (NEDO)

  16. FY1997 geothermal development promotion survey. Development feasibility study 'Ashiro area'; 1997 nendo chinetsu kaihatsu sokushin chosa. Kaihatsu kanosei chosa (Ashiro chiiki) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    With regard to the Ashiro Town area in Iwate Prefecture, this paper reports the result of evaluations based on temperature and pressure logging after a lapse of an extended period of time (well No.2) and a steam jet test (well No.1). These activities were performed as the survey on promotion of geothermal development and survey on development feasibility in fiscal 1997. As a result of the overall analysis based on the present survey and ones in the past, the geothermal system model in the surveyed area may be conceived as follows: in both of the N7-AR-1 and N7-AR-2 wells drilled in the southern part of the surveyed area, temperature as high as 250 degrees C or higher was confirmed; the underground temperature is 200 degrees C or higher at an altitude level of zero meter and 250 degrees C at around -500 m, leading to a belief that the high temperature area spreads to south; as a fracture system holding geothermal fluid, a fault was identified at the N7-AR-1 well drilling depth of 1710 m; in the steam jet test, a geothermal reservoir (a shallow geothermal reservoir) was confirmed to exist; the geothermal fluid that has jetted out shows alkaline Na-SO{sub 4} type; and the deep geothermal reservoir has high temperature and is presumed to be in the two-phase condition, presenting promising factors as the geothermal resources. (NEDO)

  17. Geothermal development promotion survey report. No. 29. Upper reach region of Oita river; 1988-1990 chinetsu kaihatsu sokushin chosa hokokusho. No. 29 Oitagawa joryu chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    The results of surveys conducted in the Oita river region, Oita Prefecture, in fiscal 1988-1989 are compiled in this report. Conducted were a geological/alteration zone survey, geochemical survey, electric prospecting (Schlumberger method), electromagnetic surveillance (simplified magnetotelluric method), electromagnetic surveillance (EMAP - Environmental Monitoring and Assessment Program method), heat flow rate survey, test boring, environmental impact survey, and so forth. Conclusions are mentioned below. It is inferred that the geothermal fluid results from groundwater originating in meteoric water, that the meteoric water takes many years to flow from the mountainous region into the ground where it is stored mainly in the Shonai stratum, that the stored water is warmed by heat from rocks in the neighborhood for development into a geothermal fluid, and that the geothermal fluid finally forms a hot spring water reservoir. Hot spring water reservoirs are found widely distributed in the basin of the Oita river. In view of the ground temperature distribution and the hot spring water geochemical temperature determined by structure boring, it is concluded that possibilities are quite low that there exists a high-temperature geothermal fluid usable for power generation. (NEDO)

  18. FY 1992 report on the survey of geothermal development promotion. Geochemical survey (No. A-1 - Haneyama area); 1992 nendo chinetsu kaihatsu sokushin chosa chijo chosa hokokusho futai shiryo. Chikagaku chosa hokokusho (No. A-1 Haneyama chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-05-01

    For the purpose of studying an expanse and characteristics of the geothermal system and a possibility of geothermal development in the Haneyama area, Oita Prefecture, geochemical survey was conducted. In the survey, various kinds of analyses were made for 13 specimens of hot spring water and 5 specimens of surface water in the area of about 280km{sup 2} at 402 measuring points of the concentration of Hg in soil gas. The results of the survey were as follows: In this survey area, it was thought that the HCO{sub 3} type geothermal water of a comparatively low temperature which was heated by the wide-spread conduction heat from the depths was widely distributed deeper than the depth of 500-700m, and it was presumed that a possibility was low of existence of a high geothermal potential which can be used for the geothermal power generation in the part deeper than the drilling depth of 700m. In the Noya area in the southwest part of the survey area, the high temperature deep geothermal reservoir was confirmed. In this area, the high temperature neutral-alkalescent Cl-SO{sub 4} type geothermal water was distributed in the depth of several 100 meters or deeper. The geothermal water seemed to flow from NE to SW along the structure in the NE-SW direction, and it was concluded that the area was the most promising one. (NEDO)

  19. FY 1992 report on the survey of geothermal development promotion. Gravity prospecting (No. A-1 - Haneyama area); 1992 nendo chinetsu kaihatsu sokushin chosa chijo chosa hokokusho futai shiryo. Juryoku tansa hokokusho (No. A-1 Haneyama chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-05-01

    For the contribution to elucidation of the geothermal structure in the Haneyama area in Oita Prefecture, gravity prospecting was conducted. Survey was carried out in the area of about 280km{sup 2} at 205 measuring points, and analysis was made altogether with the existing 3,273 gravity measuring points. As a result, the following were made clear. The gravity basement forms the fault-state structure that sinks several 100 meters to the south side on the line from the south edge of the Higashi-shiiya ridge to Mt. Kurotake - Mt. Daigansen - Amagase hot spring in the SW direction. This fault was made correspondent to the Beppu north fault on the east side of Mt. Kurodake. Each of the following regions is the region where the fault-state structure that predicts the development of fracture and the area of distribution of alteration zone that can be cap rock overlap each other: NW edge of Shishimuta sedimentation zone - Machida alteration zone distribution area; N edge of the Shishimuta sedimentation zone - Ibushi alteration zone/Noya alteration zone distribution area; Vicinity of Mt. Kurodake - Hijiu alteration zone distribution area. It seems that the above-mentioned regions have high potentiality of geothermal exploration. The region where new igneous activities are seen, which is near the heat source, is important for exploration. The distribution area is seen near the west of the Mizuwake Pass ridge. (NEDO)

  20. Fiscal 1998 research report. Construction model project of the human sensory database; 1998 nendo ningen kankaku database kochiku model jigyo seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This report summarizes the fiscal 1998 research result on construction of the human sensory database. The human sensory database for evaluating working environment was constructed on the basis of the measurement result on human sensory data (stress and fatigue) of 400 examinees at fields (transport field, control room and office) and in a laboratory. By using the newly developed standard measurement protocol for evaluating summer clothing (shirt, slacks and underwear), the database composed of the evaluation experiment results and the comparative experiment results on human physiological and sensory data of aged and young people was constructed. The database is featured by easy retrieval of various information concerned corresponding to requirements of tasks and use purposes. For evaluating the mass data with large time variation read corresponding to use purposes for every scene, the data detection support technique was adopted paying attention to physical and psychological variable phases, and mind and body events. A meaning of reaction and a hint for necessary measures are showed for every phase and event. (NEDO)

  1. Regional new energy vision formulation project for Takarabe Town. Report; 2001 nendo Takarabe cho chiiki shin energy vision sakutei tou jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For promoting the introduction of new energy and for elevating people's consciousness of such in Takarabe Town, Kagoshima Prefecture, surveys and studies were conducted concerning the energy consumption profile of the town, the amount of new energy resources in existence, and new energy introduction plans, and then a vision was formulated. The town's energy consumption is estimated at 879.350-million MJ/year, with the transportation sector responsible for 46.6%, the industrial sector for 23.0%, the residential sector for 18.7%, and the people's livelihood-related business sector for 11.7%. Oil-based fuels occupy 70.4%, electric power 18.9%, and LP gas 8.4%. New energy introduction projects were studied, which included the introduction of photovoltaic power into the town office; photovoltaic power and hybrid power-lighted light for an oasis-on-the-road project and school facilities; introduction of cogeneration, wind power, and photovoltaic power into a hot spa health center and a water-friendly park; small-scale hydropower in the Okawara valley; wind power generation on Mount Shiraga and Jingaoka; introduction of clean energy vehicles for official use; and compost manufacturing and power generation using livestock waste. (NEDO)

  2. Fiscal 1999 report on international joint research project on global environmental technology; 1999 nendo chikyu kankyo gijutsu kokusai kyodo kenkyu jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    As part of the above-named effort, Japanese researchers were dispatched to overseas universities and laboratories for implementing joint researches into 11 subjects selected by the NEDO (New Energy and Industrial Technology Development Organization) screening committee. When the feedback of fruits of the researches to NEDO projects is taken into account, it may be said that the accomplishments, attained relative to the development of processes for the practical application of environmentally-friendly biomass energy and measures for promoting its adoption, will contribute to the completion of an environmentally-friendly energy production process, excellent in CO2 emissions reduction, in which biomass will be the raw material. In relation to the technology of installing pipes for CO2 discharge into the ocean, some of the dispatched researchers had an opportunity of studying technological problems not deal with under NEDO research and development projects. In the study of organized structures of low-purity CO2 bubble groups, a great contribution was made to the promotion of the NEDO-implemented project of evaluating the impact of CO2 storage in the ocean upon environments. The development of remedial technologies for Microcystis aeruginosa-invaded lakes by introducing environmental engineering assumes a very important position in the endeavors for environmental improvement in developing nations in the Asia-Pacific region. (NEDO)

  3. Fiscal 1998 report on international joint research project for preventing global warming; 1998 nendo chikyu ondanka boshi kokusai kyodo kenkyu jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-01

    Japanese researchers were dispatched to research institutes abroad for conducting joint studies on nine subjects for which such efforts would work effectively. The researchers were sent to various research institutes in the U.S., Britain, Germany, and others. The nine subjects were (1) the application of the most up-to-date welding and bonding technologies to liquid hydrogen storage/transportation containers, (2) development of low-temperature high-activity metal catalysts for energy conservation processes, (3) study of CO2 emission behavior using a large-scale simulator of deep sea circumstances, (4) study of condensation control for steam and chemical species in the global atmosphere, (5) numerical analysis of semiconductor crystal growth for ultralow loss power device, (6) development of sulfur-rich hydrocarbon gasification technology using a metal melting furnace, (7) assessment of techniques for evaluating origins of environmental pollution gas, geothermal gas, and soil gas using multiple isotopes, (8) analysis of behavior of the steam circulation type turbine system, and (9) the embodiment of a large premixed compression ignition engine. (NEDO)

  4. Coal engineer training project for fiscal 1999. Report on general course training; 1999 nendo sekitan gijutsusha yosei jigyo. Ippan course kenshu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-19

    This report was made on the general course training in the coal engineer training project implemented in fiscal 1999. The training was conducted from June 7 through November 19 with total 7 participating trainees from an electric power company, mining company, etc.. In the training, the lectures were given by speakers from domestic coal related companies, universities, laboratories and the like at the University of International Resources, a foundation, for about three weeks. An English training was carried out by three instructors at the same University for about eleven weeks with the purpose of acquiring the linguistic ability required for overseas coal development. The joint seminar was conducted in Tokyo by inviting lecturers, two from Australia and one each from Canada and Indonesia. The training by visiting the domestic coal related companies was such that the overseas lecturers and trainees visited Matsushima Mining Co., the Electric Power Development Company, NKK Corp and others. The overseas study and training were performed on a 35 day schedule by visiting energy-related institutions, mining companies, railway companies, coal loading/unloading harbors, and thermal power stations in Canada, the U.S., and Australia. (NEDO)

  5. Report on regional new energy vision formulation project for Kahoku town, Kumamoto Prefecture; Kahokucho chiiki shin energy vision sakutei nado jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    A regional new energy vision has been formulated for Kahoku town, Kumamoto Prefecture, for the realization of an energy resource circulation type regional community in which people earnestly strive to be symbiotic with nature. The results of related activities are shown in six chapters, which are (1) the prerequisites to the plan, (2) outline of the Kahoku town region, (3) surveys of the existing amount and expectedly available amount of new energy, (4) feasibility of new energy introduction, (5) assessment of new energy introduction plans and their effect, and (6) tasks to discharge, and policies to follow, for new energy introduction. In chapter (5), new energy introduction plans and introduction policies are shown. Plans are made for the incorporation of photovoltaic power facilities, small hydroelectric power facilities, and bamboo chip boilers into public facilities; the installation of 750 kW class wind power facilities; and the adoption of hybrid vehicles to serve as official special vehicles. It is expected that these plans when implemented will bring about a 1,400 t-c/year reduction in CO2 emissions. As for the introduction of wind power generation, the dimensions are determined by taking into consideration the prerequisites to a NEDO (New Energy and Industrial Technology Development Organization) grant. (NEDO)

  6. Fiscal 1992 report on geothermal development promotion survey (Development of geothermal reservoir assessment technique); 1989 nendo chinetsu kaihatsu sokushin chosa (Chinetsu choryusou hyoka shuho kaihatsu hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    Efforts were exerted in fiscal 1984-1992 to develop techniques for appropriately assessing a geothermal reservoir for its productivity for duly predicting the optimum scale of power generation to be provided thereby. In the development of simulators, geothermal reservoir simulators (SING-1, -2, -3) and a geothermal well 2-phase flow simulator (WENG) were developed. As for the treatment of fractures in a reservoir and of substances soluble in the hot water, the methods for dealing with them were improved and augmented. In a model field study in a Hokkaido forest, reservoir pressure continuous observation and monitoring, temperature logging and pressure logging for existing wells, and geothermal fluid chemical analysis were performed for reservoir analysis, in which both natural state simulation and history mapping excellently reproduced the temperature and pressure distributions. The temperature and pressure distributions in a natural state simulation, out of the results of an analysis of the Oguni district model field, Kumamoto Prefecture, agreed not only with those in the natural state but also with the pressure transition data in the observation well. (NEDO)

  7. Regional new energy vision formulation project for Yobuko Town. Fiscal 2001 report; 2001 nendo Yobuko cho chiiki shin energy vision sakutei jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For promoting the introduction of new energy and for elevating people's consciousness of such at Yobuko Town, Saga Prefecture, surveys and studies were conducted involving the amount of energy needed by the town, the amount of new energy resources in existence, and new energy introduction programs, and a vision was formulated. The demand for energy of the town is estimated at 105,040 drums/year in terms of crude oil - 37% in electric power, 34% in fuel oil A, 13% in gas oil, and 8.1% in gasoline. As for the presence of new energy resources, it is deemed that wind and solar energies will be richly available. Studies were conducted for new energy introduction programs, which included the introduction of photovoltaic power into a nursing home for aged people, primary and junior high schools, and a water reservoir; street lamps lighted by a hybrid power system and a solar cell clock for the plaza in front of the harbor; introduction of wind power into the little islands of Ogawa and Kabe; installation of a solar energy collector for the nursing home for aged people; and the use of clean energy vehicles for official business. It is estimated that the efforts will bring about a 1,256.6 t-C reduction in carbon dioxide emissions. (NEDO)

  8. Fiscal 1999 technical survey report. Green Helmet Project (China, Sintering in steel industry); 1999 nendo green helmet jigyo (Chugoku seitetsugyo shoketsu) chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    A sinter cooler waste heat recovery system was installed and put to use at Taiyuan Iron and Steel Company in 1997. For the popularization of the system and technology, installation feasibility studies were conducted for Chungching Iron and Steel Company, Laiwu Iron and Steel, and Chiuchuan Iron and Steel Company. At Laiwu, studies were under way for the adoption of a China-manufactured system. At Chungching and Chiuchuan, there was a strong will to accept Japanese systems. Although a full investment/profit analysis including the cost of facilities remains to be carried out, it was concluded that the two steelmaking plants would be worth investment. The problems were how to raise funds and how much to invest. Although the system was simple and inexpensive under a Chinese design and was in a fairly wide use, it was found that it was not necessarily sufficient in heat recovering performance, service life, and capacity. A level of steam production to enable recovery in the form of electric power would be difficult to achieve, and the use of the resultant power would be limited only to in-house consumption of a small scale. (NEDO)

  9. Report on the project of drawing energy-saving visions for the Town of Sayo district; Sayomachi chiiki sho energy vision sakutei jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The survey/study is conducted to draw the district energy visions for Town of Sayo, Hyogo Pref. The town as a whole consumes energy at 1,269,040GJ/y, or 140,817MJ/y per capita, which is about 1.2 times larger than the nationwide average. By energy source, electric power accounts for 43%, and oil products 53%. The town as a whole emits carbon dioxide at 18,900,403kg-C/y, or 2,097kg-C/y per capita, which is lower than the nationwide average. The short-term (1 year or less), medium-term (3 year or less) and long-term (5 years or less) targets are drawn by employees of the town offices, citizens and entrepreneurs for energy-saving directions (saving of power for air conditioning by adjusting clothes, wider use of bicycles and public trains). Those facilities investigated for promoting energy saving include those for the town office buildings, solar energy system for producing hot water for town-operated swimming pool, and solar energy system and photovoltaic system for Harima Observatory Park. (NEDO)

  10. Project report on drawing district energy-saving visions for Town of Nishi Senboku; Nishi Senboku machi sho energy vision sakutei nado jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Studied in this project are concrete energy-saving procedures, and potentially saved energy and abated CO2 emissions in Town of Nishi Senboku, to promote energy saving and abatement of gas emissions which cause global warming. The energy-saving procedures studied include co-generation, utilization of waste heat, wind power generation, utilization of low-temperature heat by snow, fuel-efficient vehicles, use of insulators for houses, energy-saving type electric appliances, energy-saving activities, and eco-driving. The results indicate that the energy-saving activities and eco-driving can potentially more contribute to energy saving than the others. The study on introduction of energy-saving facilities in the 'Nukumori Hot Spring/Umeria' project indicates that the heat pump plus co-generation case is the most advantageous, because it can potentially reduce primary energy by 2,845,215MJ/y and CO2 emissions by 22,688kg-C/y. Introduction of energy-saving facilities is also studied for an information center in the Nishi-Senboku service area for the Akita Highway. The results indicate that the introduction can potentially reduce primary energy and CO2 emissions by 25 and 13%, respectively. (NEDO)

  11. FY 1994 report on the survey of geothermal development promotion. Complementary survey on the fracture system, etc. (Wasabizawa area); 1994 nendo chinetsu kaihatsu sokushin chosa sogo kaiseki hokokusho futai shiryo. Wasabizawa chiiki danretsu kei tou hokan chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    For the contribution to elucidation of the geothermal structure in the Wasabizawa area, Akita Prefecture, survey by the paleomagnetic measurement and fracture system measurement was conducted of the borehole cores and specimens of outcrop granite obtained from boreholes of N6-WZ-3 and N6-WZ-4. In the survey, the following were carried out: measurement of the core fracture system of N6-WZ-3 (102-1,505m) and N6-WZ-4 (507-1,556m), paleomagnetic measurement of 9 outcrop granite specimens and 16 core specimens, and k/Ar age determination of 3 outcrop granite specimens. As a result of the paleomagnetic measurement of outcrop granite, the magnetization azimuth of the schistose granodiorite distributed in Kuwanosawa was regarded as almost NS. The measured magnetization azimuth of the core specimen obtained from the same rock mass was also made NS-based, and measurement of the fracture in the neighborhood was made. As a result, it was found out that the NNW system was dominant in dikes and that there was the NE system in most of the small geothermal channels. The fracture system of well tended to develop around the boundary between granite and metamorphic rock, and it was thought that this part could be a reservoir if temperature conditions are prepared. (NEDO)

  12. Fiscal 2000 report of investigation. Project for promoting international cooperation for global environment/Project for assessment on effect of climate change; 2000 nendo chikyu kankyo kokusai kyoryoku suishin jigyo / kiko hendo eikyo hyoka nado jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Assessment and examination were conducted on the scientific/technological aspect, environmental aspect and economic/social aspect concerning measures for mitigating climate change, as a part of international cooperation in global warming issues. In the development of assessment methods for cost analysis, it revealed that, in the activities for mitigating emission of greenhouse effect gases (GHG) or for increasing carbon sequestration, benefits of the mitigation sometimes surpassed their cost, allowing the society to benefit from the mitigation. In the examination of problems in technology transfer and their solutions, it was found that, in order to attain successful transfer, partnership among the parties interested was essential and that each government was capable of promoting such partnership. In the assessment of various policy options, the situation in the U.S. is such that the market aspect of GHG emission permit and credit trading is rather weak because of immaturity in a legal framework on GHG emission trading and because of undefinedness in the systems of the Kyoto Protocol and in the possibility of its validation. However, the reason enterprises are actively participating in the early market is that they plan a risk-hedge for example in anticipation of tighter regulations in the future. (NEDO)

  13. Report on surveys in fiscal 2000 on the survey on promotion of freer flow of researchers; 2000 nendo kenkyu jinzai no ryudoka sokushin ni kansuru chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    In order to help discuss the system and environment improvement to promote freer flow of Japanese researchers, surveys and discussions were given on the actual status in America and European countries. In the U.S., results as independent researchers are demanded from the very early time under the severely competitive environment, wherein the fair evaluation of the results allows the researchers to step-up the positions and research environment to which the researchers are oriented. In Germany, a function to promote researcher mobility is available as a system, such as promotion of exchange with other sectors during researcher education course (the internship system at the fourth grade in a university, and power training and performance record building at the Max-Planck Institut during the long term of post-doctoral period before attaining a professor position), or prohibition of inviting university professors into the same faculty. The actual status of Japan not having high mobility of researchers has been caused by the system based on the lifetime employment, whose shortcomings include stiffness in personnel affairs, and reduction in activities of researchers due to aging. (NEDO)

  14. Geothermal development promotion survey. No.B-4 'Kuenohira-yama area'; 1997 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. No.B-4 Kuenohira-yama chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-01-01

    The above-named survey had been scheduled to be conducted in fiscal years 1996-1998 for an approximately 10km{sup 2}-large area of Kokonoe-cho, Kusu-gun, Oita Prefecture. In fiscal 1996, surface surveys were conducted, such as geological and alteration zone surveys, gravity prospecting, and electromagnetic survey. In fiscal 1997, an exploration well (N9-KH-1: depth 2,222.0m) was drilled. Since the maximum temperature in the well was found to be so low as 78.5 degrees C, the survey was given up in the second year. The survey conducted at N9-KH-1 showed that deep-seated and shallow-seated ruptures developed there in the absence of aquicludes, and so it was inferred that it was a recharge area, as predicted by the temperature logging profile, with surface water flowing into the depth. The above showed that there was no deep-seated blind geothermal system which the survey was after. Since it was not likely that the shallow-seated geothermal system located in the southern part of the Mizuwake pass would be found expanding into the area of the current survey, it was decided that the survey not be carried forward to the following fiscal year. (NEDO)

  15. Report on the fiscal 1996 research cooperation promotion project, `the research cooperation diagnosis survey`; 1996 nendo kenkyu kyoryoku jigyo `kenkyu kyoryoku shindan chosa` hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    A diagnosis survey was conducted for Japan to cooperate in researching subjects on technical development in developing countries. In fiscal 1996, surveys were made on the following: (1) establishment of the industrial base (Vietnam), (2) preservation of biological diversification and the continuous utilization (Brazil), (3) fostering of the industry of automobile parts (Thailand), (4) finding out of items on environment related fields (India), (5) environmental response type system for effective use of water resource (the Philippines), (6) small size geothermal exploration in remote islands (Indonesia). (1) is research cooperation for welding technology, powder metallurgy technology, hypoid gear manufacturing technology, and iron making technology by the direct reduction method. In (2), research/development are conducted in cooperation with research institutes in Brazil on survey/identification/utilization of bioactive substances from biological resources in Brazil. In (4), an examination was made of the seeds for research cooperation in technical fields such as environment and energy. Having a strong relation with the industrial circle, SCIR is carrying out researches on aerospace, petrochemical, biology, electronics, medicines/drug, etc., which indicated fulfillment of intellectual infrastructure in India. 52 figs.

  16. Fiscal 1997 survey report on international cooperation for the energy use rationalization method; 1997 nendo jigyo hokokusho (energy shiyo gorika shuho kokusai kyoryoku chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    To carry out LCA in ISO-14040, inventory analysis (IA) is the basic. For studying arrangement of public data to carry out IA, collection work was done of background data which are indirectly concerned with copying machine. First, methods to make inventory data (ID) which are thinkable in the present situation were prepared, and items of emitted matters to be collected were set up in relation to the impact assessment method. Secondly, scenarios of each stage of life cycle of copying machine were set up, and virtual data on the material/energy consumption amount were arranged. Based on this, a method was further studied for making ID of the parts used in electric power, iron/steel, plastics, and copying machine. Third, based on the above-mentioned study results, ID was actually made, and a possibility was studied of making inventory in life cycle of copying machine. Moreover, the state of the automobile LCA carried out at Stuttgart University was examined. At last, the paper summed up subjects of and future study methods for the inventory making method. 2 refs., 25 figs., 77 tabs.

  17. Regional new energy vision formulation project for Ukiha Town. Fiscal 2001 report; 2001 nendo Ukiha machi chiiki shin energy vision sakutei tou jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For promoting the introduction of new energy and for enhancing people's consciousness of such in Ukiha Town, Fukuoka Prefecture, surveys and studies were conducted involving the amount of energy needed by the town, the amount of new energy resources in existence, and new energy introduction projects, and a vision was formulated. The energy consumption of the town is estimated at 158,886 drums/year in terms of crude oil - 56.2% in electric power, 19.5% in gasoline, 10.5% in gas oil, 6.9% in kerosene, 4.2% in fuel oil A, and so forth. Projects for introducing new energies were studied, which included the introduction of photovoltaic power systems into public facilities, gymnastic halls, and comprehensive welfare centers; introduction of a large wind power system (1,500 kW) in the vicinity of the Michinoeki roadside service spot; installation of a power plant fueled by woody biomass (scrap wood, saw dust, and the like); introduction of clean energy vehicles for official use; installation of photovoltaic/wind hybrid power-lighted street lamps in the shopping area; installation of light traps for agriculture burned by photovoltaic power; and financial aids for encouraging the installation of photovoltaic power generation systems in general residences. (NEDO)

  18. Wind power development field test project at Ashibe-cho. Detailed wind characteristics survey; Ashibecho ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A detailed wind characteristics survey was conducted at Ashibe-cho, Iki-gun, Nagasaki Prefecture, on the assumption that a wind power generation system would be constructed. The survey was a 1-year project from October 1998 through September 1999, and wind characteristics such as the average wind speed, average wind direction, standard deviation of wind velocity, and the maximum instantaneous wind speed were observed. The observation point was fixed at 20m above ground, the minimum time unit for observation was 10 minutes, and the 10-minute average value was defined as the measured value. For the maximum instantaneous wind speed, the minimum time unit for observation was set to be 2 seconds. The yearly average wind speed was 5.8m/s and the maximum wind speed in the period was 35m/s. Winds came from the prevailing direction of NE (21.3%), and then from NNE (14.7%) and ENE (7.9%). The wind axis was in the NE-SW direction, and the total wind direction occurrence rate from the 6 directions was 60.2%. Turbulence intensity was 0.19 at wind speed 2.0m/s or more and 0.17 at wind speed 4.0m/s or more. Estimated wind turbine yearly operating factors of 66-84% were obtained using rated values of a 150kW, 300kW, and 750kW-class wind turbines. (NEDO)

  19. Fiscal 2000 coal engineer training program. Report on research study of general training course; 2000 nendo sekitan gijutsusha yosei jigyo. Ippan kosu kenshu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-11-22

    In connection with fiscal 2000 coal engineer training program, a research study of the general course was implemented with eight participants for the period from June 12 to November 22. In the field training, lectures were given at International Resources University by speakers from related companies, universities and laboratories, on such subjects as coal geology, coal mining technology, coal probing technology, marine cargo transportation, analysis, coal utilization technology, environmental preservation technology, overseas coal mine development project, and foreign coal situations. Also, in the seminar, on-the-spot training was conducted at such places as Taiheiyo Tanko Kushiro mining station, Nippon Kokan KK Keihin ironworks, Electric Power Development Co., Isogo thermal power station, Idemitsu Kosan Co., coal laboratory, MITI Agency of Natural Resources and Energy. In the overseas training, research study in China was carried out during the period from July 2 to July 7 while research study in the U.S./Canada and Australia/Indonesia were conducted separately by two groups through 35 day trip from Oct 7 to November 10. The major places for visit were energy-related organizations, coal mining companies, railway companies, coal handling harbors, coal thermal power stations, coal analysis companies, etc.. (NEDO)

  20. Report on an international joint research project for global environment technology in fiscal 1998; 1998 nendo chikyu kankyo gijutsu kokusai kyodo kenkyu jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In order to serve for measures against global problems taken by Japan, joint research was carried out with overseas research organizations. The research project selected ten themes considering urgency, internationality and economic proliferation effect in areas to serve for solution of global environment problems. These themes include removal or emission control of greenhouse effect gases, measures against atmospheric environment problems such as acid rains and ozone layer destruction, prevention of ocean contamination, development and effective utilization of energies and resources. When the feedback of these themes to the NEDO projects is considered, the research achievements in relation with development of the acid rain monitoring system in particular support indirectly development of carbon dioxide fixation technologies. The research achievements in developing an environmentally friendly biomass energy manufacturing process and environmental effect evaluation thereon contribute as an effective process to carbon dioxide reduction using biomass as raw materials. The achievements in research of nonlinear interfacial properties and mixed phase turbulence of low-purity carbon dioxide bubbles contribute to a project related to storage of carbon dioxide in oceans. (NEDO)

  1. Report on the general course training of the fiscal 1996 coal engineer training program; 1996 nendo sekitan gijutsusha yosei jigyo ippan course kenshu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The paper reported the general training of the fiscal 1996 coal engineer training program supported by NEDO. In Japan, where natural resource is poor, it is important to transfer from its petroleum dependence energy structure to the system for new energy development and dispersed energy supply. Coal resource is distributed widely in the world and is expected to spread in the future as a main substitute for petroleum. Worldwide attention is much paid to coal supply/demand and environmental problems, but the situation surrounding coal is not necessarily favorable. Under these conditions, Japan is a prominent coal importing country and is on the world-top level in terms of coal utilization technology. Japan has heavy responsibility and needs to play a leading role in adjusting and solving various problems on coal both domestically and internationally. Under the circumstances, 7 persons who are engaged in the coal related business and expected to be in future (3 from the mining relation and 4 from electric power comapanies) participated in the training this fiscal year and received the top-level training in Japan and overseas. 20 figs., 3 tabs.

  2. Fiscal 2000 report on regional new energy vision formulation project for Yoron town; 2000 nendo Yoroncho chiiki shin energy vision sakutei nado jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    A regional new energy vision has been formulated for Yoron town, Kagoshima Prefecture, which will serve as guidelines for building an Environmentally Friendly Island. Yoron town is a town of approximately 6,000 inhabitants as of fiscal 2000, its energy consumption is equivalent to 61,427 drums in terms of crude oil, and it receives electric power from Yoron Power Plant of Kyushu Electric Power Co., Inc. The results of activities conducted in this connection are summarized in seven chapters, which are (1) coping with new energy vision formulation (2), energy supply and demand, (3) estimation of existing amount of new energy, (4) basic policy toward new energy introduction, (5) projects for introducing new energy, (6) existing energy systems, and (7) reference materials. Named as projects are the construction of a water supply power source (for storage pump) for the Furusato district; power source for farmland irrigation pumps; power sources for the integrated sports park and municipal library; power source for a farmyard compost center; wind power, photovoltaic power, and combined power generation facilities for streetlights; and the utilization of bagasse. (NEDO)

  3. Fiscal 1998 geothermal development promotion survey. Annex to on-the-ground survey report, geothermal development promotion survey (Part 2. Electromagnetic surveillance using simplified MT method - No. 30: Western part of Hakkoda area); 1989 nendo chinetsu kaihatsu sokushin chosa. Chinetsu kaihatsu sokushin chosa chijo chosa hokokusho futai shiryo (Denji tansa (MT kan'i ho) hokokusho - No.30 Hakkoda seibu chiiki - 2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-01-01

    An electromagnetic surveillance using the simplified MT (magnetotelluric) method was conducted to help clarify the geothermal structure in the western part of the Hakkoda area, Aomori Prefecture. The survey covered approximately 60 km{sup 2,} and involved 38 survey points, 3 magnetic field components, 2 electric field components, not less than 10 measuring frequencies in the range of 0.01-125 Hz, and a measuring time of not less than 2 hours. An analysis was performed, with data previously collected at 60 points added to the data collected at the said 38 points. As the result, the resistivity structure in this area was divided into 3 layers of high-low-high as described from the surface to the depth, and the middle layer was further divided into 3 layers of high-middle-low and the bottom layer into 2 layers of high-low. The result conformed though roughly to the result obtained by the electrical logging carried out in the structure boring. In the geothermal zone including the Sukayu hot spa in the southeastern part of this area and along the Jogakura valley, there exist a complicated resistivity structure attributable to geothermal activities and a number of discontinuous lines of resistivity running in the directions of WNW-ESE and N-S. This enabled an inference that there is a deep-seated geothermal source between Odake and Akamizusawa extending eastward from the said geothermal zone. (NEDO)

  4. Fiscal 1998 geothermal development promotion survey. Annex to on-the-ground survey report, geothermal development promotion survey (Part 2. Electromagnetic surveillance using simplified MT method - No. 30: Western part of Hakkoda area); 1989 nendo chinetsu kaihatsu sokushin chosa. Chinetsu kaihatsu sokushin chosa chijo chosa hokokusho futai shiryo (Denji tansa (MT kan'i ho) hokokusho - No.30 Hakkoda seibu chiiki - 2)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-01-01

    An electromagnetic surveillance using the simplified MT (magnetotelluric) method was conducted to help clarify the geothermal structure in the western part of the Hakkoda area, Aomori Prefecture. The survey covered approximately 60 km{sup 2,} and involved 38 survey points, 3 magnetic field components, 2 electric field components, not less than 10 measuring frequencies in the range of 0.01-125 Hz, and a measuring time of not less than 2 hours. An analysis was performed, with data previously collected at 60 points added to the data collected at the said 38 points. As the result, the resistivity structure in this area was divided into 3 layers of high-low-high as described from the surface to the depth, and the middle layer was further divided into 3 layers of high-middle-low and the bottom layer into 2 layers of high-low. The result conformed though roughly to the result obtained by the electrical logging carried out in the structure boring. In the geothermal zone including the Sukayu hot spa in the southeastern part of this area and along the Jogakura valley, there exist a complicated resistivity structure attributable to geothermal activities and a number of discontinuous lines of resistivity running in the directions of WNW-ESE and N-S. This enabled an inference that there is a deep-seated geothermal source between Odake and Akamizusawa extending eastward from the said geothermal zone. (NEDO)

  5. Report on the invitation program for developing countries concerning technology promotion project of global environmental industry in FY 1997; 1997 nendo chikyu kankyo sangyo gijutsu suishin jigyo ni kakawaru chikyu kankyo kanren gijutsu kaigai kenkyusha shohei jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    In an effort to help preserve the global environment, International Center for Environmental Technology Transfer (ICETT) contributes to the solution of global environmental problems by promoting research exchanges with developing countries. As a part of this effort, ICETT hosted an environmental development researcher who visited Japan from the Institute of Environmental Research of Chulalongkorn University in Bangkok, Thailand. The invitation was extended at the request of NEDO. During the period of this investigation between September 16 and December 14, 1997, a photocatalyst was prepared and its performance was evaluated under the theme ``Application of photocatalysis to purification of atmospheric environment.`` At the same time, roadside test spots were inspected to study the practical application of optical photocatalysis. The visiting researcher also visited the National Institute for Resources and Environment to discuss with the staff of institute. This helped to deepen understandings of the state of air pollution problems confronting Japan, Europe, and North America, as well as issues related to the technologies that have been developed to solve these problems. The visiting researcher toured the RITE and examined Japan`s progress in the development of environmental control technology through joint research involving government, industry, and academia. At ICETT, the visiting researcher received training in Japan`s approaches to environmental problems in developing countries

  6. Fiscal 1997 research report. International energy use rationalization project (Analytical tool research project for energy consumption efficiency improvement in Asia); 1997 nendo kokusai energy shiyo gorika taisaku jigyo chosa hokokusho. Asia energy shohi koritsuka bunseki tool chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The project aims to prepare inter-industry relations tables and models for energy analysis for Asian countries and thereby to probe into relations between the industrial structure or the ultimate consumption structure and energy consumption. For the comprehension of energy consumption as broken by each industry, Asian nations' inter-industry relations tables and energy statistics are linked for the compilation of energy analysis oriented inter-industry relations tables, and the resultant tables are used for the metric analysis of industrial structures and energy consumption structures in these countries. The tables prepared this time are 1985 tables for Korea, Indonesia, Thailand, and the Philippines and 1990 tables for China, Singapore, and Malaysia. The Malaysian transportation sector needs to be improved in energy saving. In Singapore, energy saving is functioning effectively in the transportation sector. China's energy consuming industries are those involving coal, chemistry, steelmaking, ceramics, and earth and quarrying. In Taiwan, improvement needs to be made in the transportation sector. Korea should conserve energy in the transportation sector. In the Philippines, energy needs to be saved in businesses related to water supply, transportation, and fishery. Thai industries as a whole needs to save energy. Improved energy consumption efficiency is sought for in the Indonesian cement related sector. (NEDO)

  7. Fiscal 1997 research report. International energy use rationalization project (Analytical tool research project for energy consumption efficiency improvement in Asia); 1997 nendo kokusai energy shiyo gorika taisaku jigyo chosa hokokusho. Asia energy shohi koritsuka bunseki tool chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The project aims to prepare inter-industry relations tables and models for energy analysis for Asian countries and thereby to probe into relations between the industrial structure or the ultimate consumption structure and energy consumption. For the comprehension of energy consumption as broken by each industry, Asian nations' inter-industry relations tables and energy statistics are linked for the compilation of energy analysis oriented inter-industry relations tables, and the resultant tables are used for the metric analysis of industrial structures and energy consumption structures in these countries. The tables prepared this time are 1985 tables for Korea, Indonesia, Thailand, and the Philippines and 1990 tables for China, Singapore, and Malaysia. The Malaysian transportation sector needs to be improved in energy saving. In Singapore, energy saving is functioning effectively in the transportation sector. China's energy consuming industries are those involving coal, chemistry, steelmaking, ceramics, and earth and quarrying. In Taiwan, improvement needs to be made in the transportation sector. Korea should conserve energy in the transportation sector. In the Philippines, energy needs to be saved in businesses related to water supply, transportation, and fishery. Thai industries as a whole needs to save energy. Improved energy consumption efficiency is sought for in the Indonesian cement related sector. (NEDO)

  8. FY 2000 International energy use rationalization project. International technology dissemination project for improving energy consumption efficiency (Green helmet project for steel heating furnaces in Thailand); 2000 nendo kokusai energy shiyo gorika nado taisaku jigyo chosa hokokusho. Kokusai energy shohi koritsuka nado gijutsu fukyu jigyo (Green helmet jigyo (Tai: kozai kanetsuro))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The project for energy saving dissemination activities and technological assistance for Thailand is carried out, and the FY 2000 results are reported. For Siam Iron and Steel (SISCO), the experts are dispatched for reviewing the operating conditions of the facilities constructed by the model project, their maintenance and examination, time series diagnosis of the recuperator performance, and providing technical assistance for fuel consumption and high-load combustion of the downstream unit. Furthermore, the site survey and technical assistance are provided for two newly selected Thai steel enterprises, Sahaviriya Steel Industries Public Co. (SSI) and the Bangkok Iron and Steel Works Co. (BISW). For SSI, it is predicted that energy of approximately 50Mcal/ton can be saved by, e.g., enhancement of waste heat recovery, enhancement of heat insulation of skid pipes, introduction of steel discharging temperature prediction system, and combustion control. For BISW, it is predicted that energy of approximately 25Mcal/ton can be saved by, e.g., enhancement of waste heat recovery and reduction of heat loss in the waste gas. (NEDO)

  9. FY 1999 Project of information exchange by researchers on environmental problems in the Asia-Pacific region. Report on investigations for establishing Environmental Technology Research Network in the Asia-Pacific Region; 1999 nendo Asia/Taiheiyo chiiki kankyo mondai kenkyusha koryu sokushin jigyo hokokusho. Asia/Taiheiyo chiiki kankyo gijutsu kenkyu kaihtsu network kochiku chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Described herein are the results of the FY 1999 activities for the project of information exchange by researchers on environmental problems in the Asia-Pacific region. In 1999, the 6th International Workshop was held in City of Yokkaichi, Mie Pref., with the theme (Implementation of international collaborative researches on environmental technology) at International Center for Environmental Technology Transfer, with a total of more than 50 domestic and foreign attendees actively participating in the discussion. The keynote addresses were (Use of coal and environmental improvements) presented by Mr. Yoshisada Nitta, Director at Central Research Institute of Electric Power Industry, and (Potential of clean fuel from biomass) presented by Dr. Kyu-Wan Lee of Korea Research Institute of Chemical Technology. The overseas surveys were conducted to promote the use and registration of the databases, and to identify problems by the on-the-spot investigations in Vietnam, the Philippines and Republic of Korea. At the same time, the mini-workshops were held for information exchange with the research institutes. It is keenly felt that Environmental Technology Research Network in the Asia-Pacific Region (ENTERNET-APR) works certainly in various areas, with the attendees in the last workshops serving as the key persons. (NEDO)

  10. FY 1992 report on the survey of geothermal development promotion. Electromagnetic exploration (TDEM method) (No. A-1 - Haneyama area); 1992 nendo chinetsu kaihatsu sokushin chosa chijo chosa hokokusho futai shiryo. Denji tansa (TDEM ho) hokokusho (No. A-1 Haneyama chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    For the purpose of elucidating a possibility of existence of geothermal reservoirs in the Haneyama area, Oita Prefecture, Electromagnetic survey by the TDEM method was conducted. The survey was made for the area of 80km{sup 2} at 105 measuring points in the south of the Haneyama area, and the resistivity structure reaching the depth of 4,000m from the earth surface was made clear. The resistivity structure in this area is composed of 4 layers: upper medium resistivity layer, central medium resistivity layer, central low resistivity layer and lower high resistivity layer. The resistivity structure discontinuous line ranges between the uplift zone of basement and the sedimentation zone, and the greater part of the alteration zone is distributed and arranged concomitant with the position and direction of the line. As the region with high potential of geothermal existence, cited were the low resistivity zone distributed in the west of the resistivity structure discontinuous line that continues from Mt. Fukuman to the south, the low resistivity zone distributed in the north of the resistivity structure discontinuous line from Noya to the west, and the low resistivity zone distributed in the north of Hosenji and lying between resistivity structure discontinuous lines. (NEDO)

  11. Regional new energy vision formulation for Kadogawa Town, Miyazaki Prefecture. Report; 2001 nendo Miyagi ken Kadokawa cho chiiki shin energy vision sakutei tou jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For promoting the introduction of new energy and for elevating people's consciousness of such in Kadogawa Town, Miyazaki Prefecture, surveys and studies were conducted concerning the energy demand in the town, the amount of new energy resources in existence, and new energy introduction plans, and then a vision was formulated. The town's energy demand is estimated to be 1,197.4-million MJ/year, which includes 44.1% for the transportation sector, 22.9 for the residential sector, 22.7% for the industrial sector, and 10.3% for the people's livelihood-related business sector. The energy demand is covered 62.7% by oil-based fuels, 22.7% by electric power, and 13.4% by LP gas. Projects discussed for new energy introduction included the introduction of photovoltaic power into the town office, primary schools, and a comprehensive workers' welfare center; introduction of a solar hot water supply system and hybrid power-lighted street light into a seaside park; introduction wind power into Motoyama Park; mini-scale hydroelectric power on the Isuzu river; introduction of clean energy vehicles into the town office; power generation fueled by methane gas from livestock excrement; and introduction of natural gas fueled cogeneration into a resort house. (NEDO)

  12. Wind power development field test project at Okkobe-cho. Close survey on wind conditions; Okkobecho ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A survey was made on regional wind conditions on the assumption that a wind power generator was installed around Okkobe Rakuno-no-oka, Okkobe-cho, Monbetsu-gun, Hokkaido. The survey period was one year from Oct., 1998 to Sept., 1999. The observations were carried out on the average wind velocity, average wind direction, standard deviation of velocity, and the maximum instantaneous wind velocity. With a fixed point observation at 20 m above ground, and with the minimum observation time unit of 10 minutes, an average value during the 10 minutes was determined as the measurement of each category. However, the maximum instantaneous wind velocity was determined on the measurement with the minimum observation time unit of 2 seconds. The average wind velocity was 4.8 m/s, the maximum wind velocity during the period was 29.9 m/s, the prevailing wind direction was WSW (17.1%), the wind axis was WSW-ENE, and the total occurrence rate of wind direction was 51.1%. The intensity of turbulence was 0.19 at a wind velocity of 2.0 m/s or above and was 0.16 at 4.0 m/s or above. An estimated annual operation rate of a windmill was 59-77% using the rated value of a 150 kW, 300 kW and 750 kW class windmills. (NEDO)

  13. Wind power development field test project at Maruyama-machi. Close survey on wind conditions; Maruyamamachi ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A survey was made on wind conditions in Maruyama-machi, Awa-gun, Chiba prefecture, on the assumption that a wind power generation system was installed therein. The survey period was one year from Oct., 1998 to Sept., 1999. The observations were carried out on the average wind velocity, average wind direction, standard deviation of velocity, and the maximum instantaneous wind velocity. With a fixed point observation at 20 m above ground, and with the minimum observation time unit of 10 minutes, an average value during the 10 minutes was determined as the measurement of each category. However, the maximum instantaneous wind velocity was determined on the measurement with the minimum observation time unit of 2 seconds. The average annual wind velocity was 3.5 m/s, the maximum wind velocity during the period was 27 m/s, and the wind axis was WSW-ENE, with the total occurrence rate of the wind direction 44.1%. The intensity of turbulence was 0.23 at a wind velocity of 2.0 m/s or above and was 0.22 at 4.0 m/s or above. An estimated annual operation rate of a windmill was 40-60% using the rated value of a 150 kW, 300 kW and 750 kW class windmills. (NEDO)

  14. FY 1998 report on the results of the project on the next generation structure housing development; 1998 nendo jisedai kozo jutaku kaihatsu jigyo seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The purpose of this project is to develop/verify technology to design/construct a structural body of multiple dwelling house which is highly durable and usable at maximum of the limited space with no projections of poles/beams, and is also to develop/verify a composite system of a structure and each house in which residential space can freely be changed horizontally/vertically in response to the leveling-up of living and changes in life style. The following were conducted: construction of an experimental house group with next generation structure; development of technology of effective space utilization/high durability body construction; development of technology of structural analysis/design systematization of antiseismic/damping system; development of commercialization of technology to heighten frame durability, development of technology to heighten durability of finishing materials of a body; development of low cost construction technology; development of technology of interface between a body and each house; verification of housing performance using a next generation body system; generalization of next generation frame system/house system. To reflect the results of the research quickly, the details of the research are systematized, and a draft is worked out of a guide for constructing the next generation frame system/house system which were arranged between the current architecture related laws and business as a general multiple dwelling house. (NEDO)

  15. Report on the fiscal 1995 research cooperation promotion project, `the research cooperation diagnosis survey`; 1995 nendo kenkyu kyoryoku suishin jigyo `kenkyu kyoryoku shindan chosa` hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    A diagnosis survey was conducted for Japan to cooperate in researching subjects on technical development in developing countries. In fiscal 1995, surveys were made on the following: (1) recycling technology of biomass industrial waste in the tropical region, (2) small size geothermal exploration in remote islands, (3) waste water recycling system using activated carbon, etc., (4) upgrading of proofreading technology of measuring standards, (5) technology to simply set up conditions for forming engineering plastics, (6) assessment of safety of chemical substances. In (1), energy and useful matters are recovered from oil palm of Indonesia by thermal decomposition technology. In (2), a system is constructed which can effectively explore geothermal energy in remote islands in the east Indonesia. As to (3), a survey is conducted in the Philippines. (4) contributes to upgrading of length measuring standards in Thailand. (5) attempts to improve technology of forming engineering plastics. In (6), research cooperation is made for preventing environmental pollution and health damage by chemical substances from happening in Thailand and for technology for assessing safety of chemical substances which contributes to the proper use of the hazardous material law in Thailand. 28 figs.

  16. Report for fiscal 1998 on the international joint research project of medical welfare equipment; Iryo fukushi kiki kokusai kyodo kenkyu jigyo 1998 nendo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In connection with the international joint research project of medical welfare, a report was made on the results of the investigation conducted in 1998 concerning the technology of overseas medical welfare equipment. In the investigation of china, observation was made on the actual state of the representative medial institutions, with opinions exchanged. Obsolete equipment and old technology are the present state in China, which is strongly desirous of exchanging information with Japan. In Taiwan, being full of venture spirit, an ultrasonic thermal treatment apparatus and an ultrasonic echo device have been produced for example. In Europe, an observation tour was conducted on a German manipulator and process robot while an investigative visit and exchange of opinions were made on the living environment and facilities in Italian training center for physically handicapped persons. Japan's self-supporting and assisting system for excretion attracted many questions and comments. In the investigation in the U.S., views were exchanged concerning '{sup 13}C-MRS device for non-invasion brain metabolic measurement' in research institutions such as universities. A machine developed in Japan received a high evaluation in that {sup 13}C spectrum was obtained from a substantial depth. (NEDO)

  17. Fiscal 2000 international energy use rationalization measures project. International energy consumption efficiency improvement technology diffusion project - Green helmet project (Thailand: Report on heating furnace energy conservation seminar); 2000 nendo. Kokusai energy shiyo gorika to taisaku jigyo, Kokusai energy shohi koritsuka to gijutsu fukyu jigyo, Green helmet jigyo (Thai : kanetsuro shoenergy seminar hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The above-named seminar was held in Bangkok, Thailand, on January 30, 2001, and covered three kinds of industries of ceramics, glass, and aluminum. Approximately 200 people attended the meeting, consisting of NEDO (New Energy and Industrial Technology Development Organization)-affiliated people and 16 lecturers from Japan, and Thai participants. The seminar comprised a 'keynote address' and 'lectures on engineering' that aimed at the three industries as a whole, and 'lectures on engineering' and 'cases and activities for energy conservation' that aimed, respectively, at the three industries. Lectures were delivered on operating technologies which were already in practical use and on state-of-the-art technologies. The keynote address, entitled 'Global warming prevention and industrial furnaces,' covered the results of the 'High-performance industrial furnace field test project.' The lectures on engineering dealt with the 'instrumentation control system' and 'heat insulation technology' which were basic technologies for energy conservation and 'diagnosis technology and practice' which aimed at the enhancement of energy conservation after the start of operation. Questions and answers were earnestly exchanged. (NEDO)

  18. Project for rationalization measures for international energy conservation. Model project concerning efficient consumption of energy for international energy conservation (Model project of waste heat recovery on billet reheating furnace); 1999 nendo kokusai energy shiyo gorika nado taisaku jigyo seika hokokusho. Kokusai energy shohi koritsuka nado model jigyo (kozai kanetsuro hainetsu kaishu model jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of curtailing energy consumption in the steel industry, a heavy energy consuming industry in Thailand, a model project was carried out for waste heat recovery on a billet reheating furnace, with the fiscal 1999 results compiled. This model project is to install a high efficiency recuperator and the latest combustion control system in the existing furnace in a SISCO (The Siam Iron and Steel Co., Ltd.) plant in Thailand. This year, following the preceding year, the construction manual was prepared, as were the test run manual, performance verification manual, operation and maintenance manual, etc. Supervisors were also dispatched to the site, giving guidance of the installation work, test run and the demonstrative operation, on the basis of these documents. Operation for verifying performance of the equipment was implemented on November 17, 1999, with the intended results obtained. Subsequently, operation maintenance instructors were dispatched, with energy saving effect proved through the collection/analysis of operation data and monitoring, for example. Further, as the dissemination activities, pamphlets and videos were prepared, and seminars were held, among others. (NEDO)

  19. Achievement report for fiscal 1999 on development of 'technology to promote diversification of secondary aluminum alloys'; 1999 nendo aluminium saisei jigane tayoka sokushin gijutsu kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Discussions were given on aluminum scraps anticipated to be generated in a great quantity mainly from automobiles in the future, with an objective to apply secondary aluminum alloys to automotive field. In the study on alloy contents and characteristics of regenerated aluminum lumps, 5182 and 5052 alloys for automobile structure members and 6000 alloy for panel use were selected as the object. Cast lumps were manufactured on a trial basis varying the concentrations of impurity elements assumed to be mixed into the regenerated material, such as Fe, Si, Zn, and Cu, as well as their cooling speeds. Subsequent processes including rolling were proceeded to evaluate the material properties. These activities have resulted in accumulation of the basic data. For the welding technology on regenerated aluminum material, studies were performed on YAG laser welding. Applicability of the regenerated material as the automobile structure members was recognized by optimizing the basic welding conditions and the basic construction conditions according to each part to be structured. In order to clarify the positioning of the regenerated metal as a resource, investigations were performed on demand trends in the aluminum scrap material, and its recycling trends. (NEDO)

  20. Fiscal 1998 research report. International measures project for rational energy use (Survey project of the analysis tool of Asian energy consumption efficiency); 1998 nendo chosa hokokusho. Kokusai energy shiyo gorika nado taisaku jigyo (Asia energy shohi koritsuka bunseki tool chosa jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    This project aims to prepare the inter-industry relations table and analysis model for energy analysis for every Asian country, and analyze the relation between energy consumption and industrial structure or final demand structure. The 1985 and 1990 inter-industry relations tables of each country were prepared in cooperation with the governmental organizations of China, Korea, Taiwan, Philippines, Thailand, Malaysia, Singapore and India. However, the 1987 and 1990 tables were prepared for China. In fiscal 1998, the project invited the representatives of each concerned organization, and held the international workshop together with Japanese specialists to discuss various issues related to not only table preparation but also data analysis. The following items were analyzed for every country: a change in final energy consumption, a dependence on coal in primary energy consumption, transfer of energy consumption to other energy resources, and an energy consumption rate in the whole industry. (NEDO)

  1. Research report of FY 1997 on the environmentally acceptable coal utilization system introduction support project. Demonstration project on simplified desulfurizers; 1997 nendo seika hokokusho. Kankyo chowagata sekitan riyo system donyu shien jigyo (kan`i datsuryu setsubi ni kakawaru jissho jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    To reduce SOx with coal utilization, a desulfurizer is introduced in Thailand as diffusion activities in the demonstration program. The purpose is to reduce the environmental pollutants. For this desulfurizer, lime mud mainly composed of lime stone is used as an absorber. SO2 in the flue gas is absorbed by the slurry of lime mud, to form calcium sulfite. The calcium sulfite blown in the bottom of recycling tank is oxidized by oxygen in the air, to form gypsum. The gypsum is recovered as a by-product. In this fiscal year, a feeder of lime stone, spray nozzles, and various analysis apparatuses were supplied. Supervisors for electric instrumentation/control were also dispatched as well as for main body construction, to carry out the instrumentation setting works, check of sequences, and adjustment of apparatuses. After the test operation, supervisors for the demonstration operation were dispatched up to March 1998, to conduct the cooperation works between Japan and Thailand sides. Thus, successful and successive demonstration operation was confirmed. 21 figs., 6 tabs.

  2. Fiscal 1997 research report. International energy use rationalization project (Analytical tool research project for energy consumption efficiency improvement in Asia); 1997 nendo kokusai energy shiyo gorika nado taisaku jigyo chosa hokokusho. Asia energy shohi koritsuka bunseki tool chosa jigyo (honpen)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    Efforts have been under way to prepare inter-industry relations tables and energy data for four Asian countries, namely, China, Taiwan, Singapore and Malaysia, and a tool for energy consumption efficiency analysis has been developed and improved. In Chapter 1, energy supply and demand in the above-named four countries is reviewed on the basis of recent economic situations in these countries. In Chapter 2, bilateral inter-industry relations tables usable under the project are employed for the analysis of the economic status of each of the countries and energy transactions between them, and a method is described of converting the tables into one-nation inter-industry relations tables which meet the need of this project. In Chapter 3, national characteristics reflected on the respective energy input tables are described, and a method is shown of converting a nationally characterized unit energy table into a common unit energy input table for registration with a database. In Chapter 4, the constitution of the Asian energy consumption efficiency improvement analyzing tool and a system using the tool are explained. In Chapter 5, some examples of analyses conducted by use of the analyzing tool are shown, in which the energy saving effect and CO2 emission reduction effect are estimated for Indonesia by use of the analyzing tool. (NEDO)

  3. Fiscal 1999 report on results of joint demonstrative project for environmentally benign coal utilization system. Demonstrative project concerning coal preparation technology (China); 1999 nendo kankyo chowagata sekitan riyo system kyodo jissho jigyo seika hokokusho. Sentan gijutsu ni kakawaru jissho jigyo (Chugoku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    This paper describes the demonstrative project for coal preparation technology, as a part of the measures against environmental pollution due to the structuring of demonstration and dissemination basis for clean coal technologies in China, The results for fiscal 1999 is reported. In the utilization of coal in China, a problem of urgency is the highly efficient selection and removal of sulfur contents in raw coal. Coal production in Chongquing City is yearly 30 million tons, of which 90% contains sulfur contents of 3% or higher. At Jinjia Colliery of Panjiang Coal and Electric Co. Ltd., Guizhou Province, a site for the present project, a number of coal seams are unsuitable for single utilization because of high sulfur contents. The coal preparation technologies to be introduced are expected to improve coal preparation efficiency and desulfurization ratio in terms of both the washability of raw coal and the accuracy of the coal washer. This is the third year of the project, with the following activities performed, namely, research/design, manufacturing/procurement of equipment, design for construction work, training of operators or the like, and documentation. The manufacturing and procurement are for such equipment as vacuum disk filter with accessories, waste water thickener, pressure filter for tailings with accessories, flocculant pump/piping, slurry tank/pump, high-shear mixer with accessories, and electric instrumentation. All the equipment arrived at the site in January, 2001. (NEDO)

  4. Fiscal 1989 geothermal development promotion survey. Annex to on-the-ground survey report, geothermal development promotion survey (Geochemical survey report - No. 32: Hachijojima district); 1989 nendo chinetsu kaihatsu sokushin chosa chijo chosa hokokusho futai shiryo (Chikagaku chosa hokokusho - No.32 Hachijojima chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-11-01

    A geochemical survey was conducted by examining soil gas and hot spa water temperature for contributing to the clarification of the subsurface geothermal structure in the Hachijojima district, Tokyo. Mercury concentration, carbon dioxide gas concentration, and 1 m-deep temperature were measured at 155 sites; and chemical and isotope analyses were conducted for 10 specimens of hot spa water and 6 specimens of surface water. After examination, 5 significant locations were isolated at the regions of Yaene-Ogago, Taredo, the northern foot of Mt. Nishi to Weather Station, the southern foot of Mt. Higashi, and the region to the south of Mt. Higashi with hot spa distributed therein. The significant locations are situated in the vicinity of a mar that produced deposit by magma-steam eruption, an alteration zone, and the parasitic volcano in Mt. Higashi, and in an area with hot spa distributed therein. It is therefore concluded that they are closely related with volcanic activities. It is inferred that geothermal signs in the Mt. Nishi area reflect a relatively deep-seated structure. As for the mercury and carbon dioxide gas concentration levels in the Mt. Higashi area, it is inferred that they again represent geothermal signs reflecting a relatively deep-seated structure. (NEDO)

  5. FY 1992 report on the survey of geothermal development promotion. Geological structure (geology/alteration zone) survey (No. A-1 - Haneyama area); 1992 nendo chinetsu kaihatsu sokushin chosa chijo chosa hokokusho futai shiryo. Chishitsu kozo (chishitsu henshitsutai) chosa hokokusho (No. A-1 Haneyama chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-05-01

    For the purpose of elucidating a possibility of existence of geothermal reservoirs in the Haneyama area, Oita Prefecture, survey of the geological structure (geology/alteration zone) was conducted. The survey was made for the area of 280km{sup 2} lying from Kusu Town to Kokonoe Town, Oita Prefecture in terms of the route survey of 174km, fabrication/judgement of 52 rock slices, whole rock chemical analysis of 21 rocks, age determination, analysis of rock mineral, X-ray diffraction, literature collection, etc. As a result of the survey, the following conclusion was obtained. When considering a possibility of existence of heat source near this area, the area near the present volcanic front was regarded as promising. The fracture structure in the depths seen in the gravity structure (part of sharp dip of gravity) is more closely related to activity of geothermal water than the active structure of E-W system near the earth surface newly formed and is important when considering the existence of geothermal resource. The periphery of the Shishimuta sedimentation zone where Takigami, Oodake, Hacchobaru and Oguni are located was especially regarded as an area propmising of geothermal energy. In the survey area, the geothermal potential was the highest near Noya - Mizuwake Pass. (NEDO)

  6. Report on the project on working out the new energy vision of Hisai City; 2001 nendo Hisai shi chiiki shin energy vision sakutei tou jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    For the purpose of promoting the introduction of new energy and enhancing the awareness of it in Hisai City, Mie Prefecture, an investigational study was conducted of the energy demand structure, existence amount of new energy and project for new energy introduction, and a vision was worked out. The energy consumption amount of the city was 21,500 lorries in the industrial sector, 11,200 lorries in the transportation sector, 2,700 lorries in the business sector and 2,400 lorries in the residential sector in terms of tank-lorry loaded oil. As features, the following were cited: growth in the transportation sector, mostly in automobiles, was great; growth in the electric power consumption in the residential sector was great. As the project for new energy introduction, the following were supposed and studied in terms of the economical efficiency and environmental acceptability: introduction of cogeneration to hospital; introduction of ligneous biomass power generation to hospital; substitution of wood burning boiler for A heavy oil boiler for hot water supply use; introduction of photovoltaic power generation for home use and business use; introduction of solar heat use hot water supply device. (NEDO)

  7. Fiscal 1999 report on result of the model project for waste heat recovery in hot blast stove; 1999 nendo netsufuro hainetsu kaishu model jigyo seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    For the purpose of curtailing energy consumption of the steel industry, a heavy energy consuming industry in China, a model project was carried out for waste heat recovery in a hot blast stove, with the fiscal 1999 results reported. In the process of this project, a heat exchanger for recovering heat is installed in the exhaust gas flue of a hot blast stove in ironworks, with sensible heat recovered through a heating medium. The heat exchanger for recovering heat and the preheating heat exchanger, which was installed in the main pipe for blast furnace gas and for combustion air, were connected by pressure piping, with the blast furnace gas and the combustion air preheated. In addition, a heating medium circulating pump for transporting the heating medium is installed, as are an expansion tank for absorbing expansion/contraction due to change in temperature, a heating medium storage tank for accepting the entire heating medium in the system for the maintenance of the equipment, and heating medium feeding pump, for example. This year, on the basis of the 'Agreement Annex', basic designs and detailed designs were performed for each equipment in the waste heat recovering equipment for the hot blast stove. Further, procurement and manufacturing were implemented for various component parts and devices of the waste heat recovering equipment. (NEDO)

  8. Wind power development field test project at Hirashima, Sakito-cho. Detailed wind characteristics survey; Sakitocho Hirashima ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A detailed wind characteristics survey was conducted at Hirashima, Sakito-cho, Nishisonogi-gun, Nagasaki Prefecture, on the assumption that a wind power generation system would be constructed. The survey was a 1-year project from October 1998 through September 1999, and wind characteristics such as the average wind speed, average wind direction, standard deviation of wind velocity, and the maximum instantaneous wind speed were observed. The observation point was fixed at 20m above ground, the minimum time unit for observation was 10 minutes, and the 10-minute average value was defined as the measured value. For the maximum instantaneous wind speed, the minimum time unit for observation was set to be 2 seconds. The yearly average wind speed was 7.1m/s and the maximum wind speed in the period was 37m/s. Winds came prevalently from N (13.9%), and then from NNE (13.3%), NW (12.2%), and NE (10.7%). The total wind direction occurrence rate involving the 4 directions was 50.1%. Turbulence intensity was 0.14 at wind speed 2.0m/s or more and 0.12 at wind speed 4.0m/s or more. Estimated wind turbine yearly operating factors of 77-87% were obtained using rated values of a 150kW, 300kW, and 750kW-class wind turbines. (NEDO)

  9. Report on field test project for wind power development at Nagashima-cho. Detailed wind characteristics survey; Nagashimacho ni okeru furyoku field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A detailed wind characteristics survey was conducted to study the feasibility of a wind power generation system for Nagashima-cho, Izumi-gun, Kagoshima Prefecture. Observation instruments were installed at the top of a hill approximately 80m above the sea level situated to the northwest of the Nagashima-cho town hall and, in the period October 1998 through September 1999, data were collected at a point 20m above ground, such as the average wind speed and direction, wind velocity standard deviation, and the maximum instantaneous wind velocity. The data were analyzed, and findings were obtained, as mentioned below. The annual average wind speed was 5.0m, strong in winter and weak in summer. The annual wind direction occurrence rate was 61.8%, turbulence intensity was 0.17 at wind speeds of 4m/s and more, these not presenting any particular problem. Wind energy density was 148W/m{sup 2}. Both wind speed conditions and energy density were slightly lower than the reference levels indicated for evaluation. Studies were made on the assumption that three classes of wind turbines (150, 300, and 750kW) would be introduced, and then it was found that both operating factors and facility availability rates exceeded the required levels. Since there were no detrimental factors in the surrounding conditions, it was concluded that possibilities were high that wind power generation at the site would be practical. (NEDO)

  10. Survey report for fiscal 1999. Project of diffusing gas driven cooling systems in Oman; 1999 nendo Oman koku ni okeru gas reibo fukyu jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    With the clean development mechanism (CDM) borne in mind, a study is made about the diffusion of gas driven cooling systems in Oman. The project under study aims to replace the motor driven turbo cooling systems, now in use at the Royal Hospital and other buildings in various areas, with gas driven cooling systems. It is then found that, when the Royal Hotel is equipped with such systems, energy will be saved by 1,855 tons/year in terms of oil, and greenhouse gas reduced by 5,129 tons/year in terms of CO2. When the Royal Hospital and other large buildings with heavy cooling loads, situated at or near the center of Muscat City and in the vicinity of the existing natural gas pipelines, are taken into account, energy will be saved by 13,049 tons/year in terms of oil and greenhouse gas will be reduced by 31,636 tons/year in terms of CO2, thanks to the presence of universities, hotels, and a sector occupied by government offices. As for the time necessary for investment recovery, it will be 4.7-5.3 years in case the investment does not cover a gas decompression station construction cost and 6.2-6.8 years in case it covers such. The new system will cost 7% less than the existing system. When a comparison is made in terms of electricity charges, the new system will be 30% lower than the existing system. The Omani Government is critical of a plan for allowing Japan to establish there an energy supply company (financed by Japan). (NEDO)

  11. Fiscal 1996 report on the committee for international collaborative research of medical and welfare apparatus; 1996 nendo chosa hokokusho (iryo fukushi kiki kokusai kyodo kenkyu jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    From a viewpoint that cancer, cerebral hemorrhage, heart disease, etc. caused by the progress in aging are problems not only to Japan but to all developed countries, a possibility of Japan`s joint study with other countries was examined to promote efficiently and effectively research/development of the apparatus required. Moreover, from a viewpoint of being the same Asian countries, a possibility of the joint study was examined also with developing countries which are largely different in disease structure and environment of the use of apparatus from developed countries. In the examination on medical/welfare apparatus technology of China, before the site examination, a book of data was arranged on the actual state of population and disease structure and the R and D situation of medical/welfare apparatus in Japan, and at the same time, celebrated persons in China were introduced by the scientific society side as widely as possible. By this preliminary study, the original objective of the examination could be achieved. In the examination with the U.S. and Europe, Japan held meetings with engineers of the U.K., France and the U.S. Japan`s `load control type walking supporting apparatus,` of which the development was finished, was very highly evaluated by each organ of the countries

  12. Report `A field test project for the disaster prevention type photovoltaic power generation (Kobe city, Hyogo prefecture)`; `Bosaigata taiyoko hatsuden field test jigyo (Hyogoken Kobeshi)` hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-12

    An experiment was conducted on the introduction of the disaster prevention type photovoltaic power system provided with storage batteries to public facilities, etc., considering not only the use of new energy from the environmental aspect, but the emergency use. In fiscal 1995, 5kW-output photovoltaic power systems were installed on the rooftop of Hiyodori and Takamaru regional welfare centers and a 30kW photovoltaic power system on the rooftop of the Hyogo Ward Office. Demonstrative tests of these systems started for collection of various data. Now that the systems were installed at the regional welfare center managed mostly by regional citizens and the ward office which is an administrative office familiar with regional residents, the understanding of and familiarity with the photovoltaic power system were obtained from regional residents, and also people were enlightened on the use of solar energy in such a point as economization of power rates using the interconnected power system. Further, for life supports, it was made possible to secure minimum electric power in emergency and to secure functions of disaster prevention spots. 3 figs.

  13. Fiscal 2000 report on regional new energy vision formulation project for Yunomae town, Kumamoto prefecture; 2000 nendo Yunomaecho chiiki shin energy vision sakutei nado jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    A regional new energy vision has been formulated for Yunomae town, Kumamoto Prefecture, from the standpoint that local autonomies are required to work out measures compatible with Government energy policies and thereby to wrestle with environmental measures being undertaken across the world. The results of activities conducted for this purposed are stated in six chapters, which cover (1) the meaning of regional new energy vision formulation and its position, (2) outline of Yunomae town, (3) energy and environments, (4) energy situation in Yunomae town, (5) Yunomae town's regional new energy vision, and (6) plans for promoting the embodiment of the vision. In chapter (5), basic policies toward new energy utilization, overall plan, leading projects, and energy conservation measures are stated. The types of new energy taken up for discussion are photovoltaic power, wind power, biomass power, refuse-derived energy, and hydraulic energy. Projects are subjected to study, which relate to photovoltaic power generation, solar heat utilization, small scale hydroelectric power, small scale wind power, and the introduction of clean energy vehicles. It is expected that these projects when carried out will cover approximately 10% of the current energy consumption of the town. (NEDO)

  14. Achievement report for fiscal 1981 on solar system survey projects implemented overseas. Singapore and Australia; 1981 nendo solar system kaigai chosa jigyo seika hokokusho. Singapore Australia

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-06-01

    During a 20-day survey tour to Singapore and Australia which started on February 7, 1982, visits were paid to 6 universities, 2 national or state research institutes, 2 state government agencies, 6 passive solar facilities, and some industrial societies and solar equipment manufactures. At universities and research institutes, research and experiments are earnestly under way for the development of solar heat collectors, for the research and testing of software programs therefor, and for the research and development of photovoltaic and geothermal power generation systems. In the case of photovoltaic power, in particular, many programs require the construction of pilot plants and simultaneous supply of power to general consumers with tests and experiments continued for the pilot plants for putting the technology to practical use. This is thought to demonstrate the urgent need for measures for out-of-the-way locations. Electric power is priced at 7-8 yen/kWh, approximately half the price in Japan. Marginal supply capability is low because power is generated mainly by coal and no nuclear power is available. Efforts at underground reserves exploitation have become very active and, since there is need to supply power to the back regions, funds are eagerly invested in on-site power generation and photovoltaic power development. In Australia, power supply is monopolized by state governments. Even in Australia, who enjoy 65% self-sufficiency in oil and export a substantial amounts of natural gas and coal, there are enthusiastic efforts at harnessing solar energy. (NEDO)

  15. Fiscal 1999 geothermal energy development promotion survey. Report on environmental impact survey - 5 (Musadake area); 1999 nendo chinetsu kaihatsu sokushin chosa. Kankyo eikyo chosa hokokusho (No.B-5 Musadake chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-01-01

    For the purpose of clarifying the environmental impact to result from the digging of borehole N11-MD-3 in Shibetsu-gun, Hokkaido, a survey was conducted of changes in (1) hot spring water quality, (2) noise/vibration pollution, and (3) air pollution due to hydrogen sulfide, before and after the digging period. Under item (1), measurements were made at four hot springs, which involved weather, air temperature, water temperature, amount of welled-up water, pH, electric conductivity, etc. Although minor changes were observed during the measuring period, none was found related to the digging process. Under item (2), noise levels were measured during the drilling period along the site boundary, at a point 500m from N11-MD-3, the Kawakita hot spring, and the entrance of Sekiyunosawa. Along the site boundary, they were 55-60 dB during the drilling period, and there was an increase of 30dB attributable to the drilling. At the 500m point, there was a 15-20dB increase attributable to the same. Vibration levels during the drilling period were 40dB along the site boundary and less than the observable minimum at the other points. Under item (3), at four points along the site boundary (50m), hydrogen sulfide concentration in the air fluctuated by 0.01-0.21ppm when the steam discharge rate was 4.47-7.20t/h. (NEDO)

  16. FY 1999 Report on research and development of energy utilization rationalization superhigh-technological liquid crystal technologies. Superhigh-technological electronic technology development promotion project for new functional electronic material design, control and analysis technologies; 1999 nendo energy shiyo gorika chosentan ekisho gijutsu kaihatsu seika hokokusho. Chosentan denshi gijutsu kaihatsu sokushin jigyo shinkino denshi zairyo sekkei seigyo bunseki nado gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-04-01

    Described herein are the FY 1999 results of the liquid crystal technology development project. For the researches on multi-layer reflection, composite panels of flattened resins of different refractive index are developed to improve 2-layer monochromic contrast ratio. The guest/host liquid crystal compositions of high orientation order are investigated as the those useful for high contrast. Compounds are pursued for superanisotropic light absorption, and modification with a substituent is found to be effective. Molecular orientation controlling is also studied. For researches on memory-sustaining type liquid crystals, the studied items include formation of thin ferroelectric films on glass substrates, improvement of voltage-sustaining characteristics by composites (including compounds), and doping of trace quantities of ionic impurities. For development of image element colors, the studied items include multi-lattice-structured, oriented HPDLC devices, composites of high birefringence (high order light scattering), and light interference, high order light scattering type light control devices. The multi-dimensionally anisotropic structure of configuration divided into 3 parts of R, G and B is developed to create directive reflection which improves brightness of the reflection type color liquid crystal. A group of compounds are pursued to develop liquid crystal compositions of high refractive index anisotropy, and promising ones are found. The results of the comprehensive investigations are also described. (NEDO)

  17. FY 2001 report on the survey of the formation promotion subsidy project on the environmentally friendly type energy community. Potential survey of the commercialization of cogeneration using ligneous biomass in Kochi Prefecture; 2001 nendo kankyo chowa gata energy komyuniti keisei sokushin hojo jigyo. Kochi ken mokushitsu kei baiomasu riyo netsuden heikyu jigyoka kanosei chosa itaku gyomu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    Survey/study were conducted of potentiality of the cogeneration business using ligneous biomass in Kami County and the periphery of Kochi Prefecture. In the survey, the following were studied: regional characteristics of the said area, levels of technology of direct combustion/thermochemical conversion, future technical trends, system candidate, grasp/analysis of the resource amount, characteristics of ligneous biomass resource in the said area, analysis of economical efficiency of the procurement of biomass resource, grasp of energy users, etc. As a result, a system was selected of a 1,000kW scale cogeneration of ligneous resource. At the present technology level and under scale conditions, it was found out that the fixed bed direct combustion system was the most profitable in securing the economical realization. As to the system mostly for power generation, however, it was found out that the heat low in unit price of energy production should widely be used because the installation cost of plant is comparatively high. Facilities such as Kochi Medical Center where heat is in great demand throughout the year can expect profit from selling heat, and therefore, those have high potentiality of the commercialization. (NEDO)

  18. Report on FY 1998 project for international energy utilization rationalization, etc. (Project of the analytical tool survey for making energy consumption effective in Asia); 1998 nendo chosa hokokusho. Kokusai energy shiyo gorika nado taisaku jigyo (Asia energy shohi koritsuka bunseki tool chosa jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In the Asian region, for the purpose of grasping effects of both economic growth and effective energy consumption, an analytical tool added with a computational function was developed with the interindustrial relations table as database for the analysis of the present situation and the simulational analysis. In the analysis of the present situation, changes between the two time-points, 1985 and 1990, were analyzed using the developed energy consumption table and the CO2 emission table. The energy consumption amount is increasing with the growing economy. However, the energy unit consumption is decreasing in countries except Korea, the Philippines, Singapore and Malaysia. The trend is that the energy consumption is becoming effective and the CO2 emission amount is decreasing. As an example of simulating the introduction effect of energy saving technology, the simulation was conducted on the three: iron steel, paper/pulp, and cement in Indonesia. As a result, the decrease in energy consumption was shown in paper/pulp by 48%, in cement by 16%, and in iron/steel by 16%. The same was also indicated in CO2 emission. (NEDO)

  19. Fiscal 1998 intellectual infrastructure project utilizing civil sector functions. Research and development project on prompt-effect type intellectual infrastructure creation (Comprehensive survey); 1998 nendo minkan no kino wo katsuyoshita chiteki kiban jigyo seika hokokusho. Sokkogata chiteki kiban sosei kenkyu kaihatsu jigyo (sogo chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Surveys and studies were conducted to facilitate and invigorate research, development, and economic activities and to provide technology related intellectual assets in an organized, systematic way. In the survey related to the buildup of intellectual infrastructures, questionnaires were sent to 789 organizations in the industrial and academic domains concerning measuring standards, reference materials, base for information on biological resources, base for safety management of chemical substances, base relating to human life and welfare, and base of knowledge relating to materials. On-site surveys were also conducted in Asia, Australia, North America, and Europe. Concerning 10 inorganic reference solutions whose development is urged because they are related to environments, raw materials for them were selected, required purity levels were defined, and methods for measurement and evaluation of safety when in prolonged preservation were investigated. Conducted in the research and development of individual subjects were database buildup on thermophysical properties, research into long-term durability of heat-resistant composite materials, research into textural structure and characteristics as materials of sintered bodies of fine ceramics, database buildup on the safety of non-ferrous metals, studies of base of human characteristics measurement, and the like. (NEDO)

  20. FY 1999 investigational survey on the project on the potential survey of the effective energy utilization model project in the Asian region; 1999 nendo Asia chiiki ni okeru kokateki energy yuko riyo model jigyo no jisshi kanosei ni kansuru chosa jigyo seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    A survey was made on the technology applicable to the energy effective utilization model project in the Asian region. In the survey, the technology was listed up which could be the base for the model project in which the use in the commercial/residential field and the use of natural energy were considered. Further, countries for survey were limited to developing countries in the Asian region. Technologies for survey were as follows: various cogeneration systems, fuel cell cogeneration systems, heat storage type heat utilization, heat storage type air conditioning using night power, night power use dynamic ice maker and heat storage tank utilization, low temperature exhaust heat use adsorption type refrigeration, low temperature waste heat recovery absorption type heat pump, low head hydroelectric power generation, energy conservation in buildings, rationalization of energy utilization by energy management, heat supply using solar energy/wind power energy, biomass energy utilization, high efficiency/multiple effect heat utilization, high performance membrane separator utilization, high temperature/high humidity drying, airless dryer, etc. (NEDO)

  1. Report on achievements in fiscal 1996. International energy usage rationalization project (project to survey energy consumption efficiency improvement analyzing tools for Asia/data edition); 1996 nendo kokusai energy shiyo gorika taisaku jigyo chosa hokokusho shiryohen. Asia energy shohi koritsuka bunseki tool chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This paper is a collection of data on surveys for energy consumption efficiency improvement, taking Japan, Korea, Indonesia, Thailand, and Philippines as the object countries. I. Industry related various value tables consist of the following: basic transaction table, throw-in coefficient table, final demand converter table, import coefficient table, added value coefficient table, inverse matrix coefficient table, sensitivity coefficient table, influence coefficient table, production inducing amount, production induction dependence, import inducing amount, import induction coefficient, import induction dependence, and inverse matrix coefficient table. II. Energy related various coefficient tables consist of the following: inherent unit quantity table, energy consumption table, CO2 table (1), CO2 table (2), unit requirement table, energy consumption induction table, energy consumption induction coefficient table, energy consumption induction dependence table, CO2 induction table (1), CO2 induction coefficient table (1), CO2 induction dependence table (1), CO2 induction table (2), CO2 induction coefficient table (2), and CO2 induction dependence table (2). Industries are classified into 34 kinds. III. The energy consumption table, CO2 table (1) and CO2 table (2) are shown as the simulation results for the four countries: Korea, Indonesia, Thailand, and Philippines. (NEDO)

  2. FY 2000 Feasibility study on the environmentally-friendly coal utilization systems as part of the international project for coal utilization measures. Feasibility study on supporting introduction of the environmentally-friendly coal utilization systems in Vietnam (Model project for introduction of advanced coal preparation systems); 2000 nendo kokusai sekitan riyo taisaku jigyo chosa hokokusho. Kankyo chowagata sekitan riyo system kanosei chosa jigyo Vietnam ni okeru kankyo chowagata sekitan riyo system donyu shien jigyo (kodo sentan system donyu model jigyo kanosei chosa jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    The feasibility study was conducted on a model project in Vietnam, aimed at solving the environmental pollution problems resulting from use of coal by demonstrating and disseminating the Japan's environmental technologies in the Southeast Asian countries. The feasibility study was conducted for the Cua Ong Coal Preparation Enterprise, which has the largest coal preparation capacity in Vietnam and port facilities. It is treating raw coal from 10 coal mines for classification and preparation, and shipping coal of various types that meet the standards for domestic use and export. The survey results point out that unrecovered coal remains in waste water discharged from the coal preparation plants to pollute the sea area, and that quantity of the refuse increases because of the unrecovered coal it contains. The environmental technologies needed to introduce include modification to variable wave pattern type jigging separator, refuse height measuring instrument and automatic controller, circulating heavy medium gravimeter, highly functional settling pond, and flocculent facilities. (NEDO)

  3. FY 2000 Report on the survey results. Survey on international cooperation for medical treatment/welfare equipment; 2000 nendo iryo fukushi kiki kokusai kyodo kenkyu jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The NEDO's representatives visited Europe and China with the objectives of, e.g., international cooperation and information exchanges for medical treatment/welfare equipment. For the welfare equipment technologies, they visited the research institutes and facilities in UK and Germany, among others, to find that the European countries place more emphasis on researches to meet the needs than on advancing the equipment itself. For the medical treatment equipment, they visited the bio-research institutes in Europe for exchanging information on post-genome and tissue engineering. The European countries are behind USA in research fund and manpower for bio-technology and bio-medical, although making great efforts with much expectation on these areas. The China's medical treatment/welfare technologies seem to be clearly still in the stage of needing aids rather than rendering cooperation. However, China has been producing a number of new products in the areas where her traditional arts of medicine are combined with advanced techniques of the West, e.g., those for examination, as felt from a number of the equipment types presented to the China Medical Treatment Equipment Exhibition. (NEDO)

  4. Report on the field test project for wind power development at Kamiyaku Town (wind characteristics investigation); Kamiyakucho ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    Wind characteristics are observed for a year at the above town located at the northern end of the Yakushima island, Kagoshima Prefecture. The exponential index of the wind speed distribution in the vertical direction is 6.06 with all the directions averaged, and is so high as 8.4/13.6 in the wind directions (W/E). Prudence should be exercised, when to estimate the wind speed at the wind turbine hub altitude, against disjunction from the simple exponential law due to geographical peculiarities of the observation location. Turbulence intensity is low and is 0.15 when the wind speed is 2m/s or more, not exerting an ill effect on wind power development. As for the total wind direction occurrence rate on the prevalent wind axis, 78.2% is recorded, which is much higher than the reference value (60%). The average wind speed on this wind axis is high, and this shows that the location is quite suitable for wind power development. The annual average wind speed of 6.3m/s is much higher than the reference value, this again promising a success. The wind energy density of 478W/m{sup 2} is sufficiently high, as compared with the reference value (215W/m{sup 2}). Since there are possibilities of a maximum instantaneous wind speed of over 60m/s, caution is to be used in determining wind endurance for the wind turbine design. The annual capacity ratios for the 150/300/750kW wind turbine models are 33.8/36.5/36.9%, respectively, higher than the NEDO-provided reference value (17% or higher) and predicting sufficient power generation. (NEDO)

  5. FY 1999 report on the survey of the international joint research project on medical welfare equipment; 1999 nendo iryo fukushi kiki kokusai kyodo kenkyu jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of internationally cooperating in the R and D of medical welfare equipment, visits were paid to Australia and the U.S. to survey the related administration/research institutes/medical welfare facilities. Australia is a world leader of heart (transplant) operation, organ transplant, artificial middle ear, apneic relaxation equipment, ophthalmological equipment, bio-materials, etc. The country wants to positively promote the international cooperation with Japan because both countries are complementary to each other. Starting about 1999, the U.S. entered the age of competition of the R and D with the use of genome, and the post-genome age is already beginning there. A number of ventures are running for creation of new industry. As to the U.S. government's measures taken for subsidy, regulation, etc. toward new industry, the information could be obtained from the persons concerned. The impression of a tour of welfare facilities in the U.S. was that hardware/software are systematically prepared there, and the aged live bright and positive lives and enjoy lives. (NEDO)

  6. 1998 Annual Study Report. New industry supporting type international standard development program (Comprehensive survey); 1998 nendo seika hokokusho. Shinki sangyo shiengata kokusai hyojun kaihatsu jigyo (sogo chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Summarized herein are results of the survey on a total of 13 themes for international standardization. These themes are for standardization of (1) color control, (2) securing interoperability between optical disk systems, (3) digital image processing for home digital electronic appliances, (4) securing interconnectability between home electronic information appliances, (5) production process systems, (6) testing and evaluation methods for fine ceramic materials for communications, (7) evaluation methods for high-temperature properties of new glass melts, (8) corrosion testing and evaluation methods for surface-treated steel plates, (9) testing and evaluation methods for high-purity titanium, (10) testing and evaluation methods for plastic optical fibers, (11) evaluation methods for high-strength, large-size steel pipe characteristics for superhigh-pressure natural gas pipelines, (12) methods for measuring mileage of hybrid electric vehicles, and (13) methods for determining recycle ratios of automobile components. This comprehensive survey also includes overseas trends for the standardization, establishment/expansion of the international standardization processes, and standardization for determining recycle ratios of home electric appliances. (NEDO)

  7. Initial-stage research report on business of drawing up regional new energy vision for Shibecha Town; Shibechacho shin energy vision sakutei jigyo chosa shoki dankai chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The vision includes (1) the buildup of foundations for comfortable living circumstances by utilizing new energy, (2) the development of local industries that befriend themselves with nature by utilizing new energy, and (3) the practice of education and training on environment through the intermediary of new energy. Concerning item (1), in the construction of public facilities, residential houses, and roads, all of which constitute the foundations of daily life, plans will be promoted to use energy produced by the utilization of natural energy resources such as solar rays, solar heat, and wind force, and other energy produced by utilizing heat from refuse incineration and heat latent in the sewage, for the establishment of comfortable living conditions with CO2 emissions reduced. Concerning item (2), studies will be made to install biogas-utilizing plants for excrement treatment and recycling in dairy and animal husbandry; and wind power generation and small-scale hydroelectric power generation will be introduced for supplying power in connection with the effort to complete programs for constructing resort country sites and public meadows. Concerning item (3), for the development of the eco-museum concept, new energy facilities utilizing solar rays, solar heat, wind force, etc., will be introduced into school buildings. (NEDO)

  8. Wind power development field test project at Kodomari-mura 'Marinetopia'. Close survey on wind conditions; Kodomarimura Marinetopia ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A survey was made on wind conditions in Imabetsu-machi, Higashi Tsugaru-gun, Aomori prefecture, on the assumption that a wind power generation system was installed therein. The survey period was one year from Oct., 1998 to Sept., 1999. The observations were carried out on the average wind velocity, average wind direction, standard deviation of velocity, and the maximum instantaneous wind velocity. With a fixed point observation at 20 m above ground, and with the minimum observation time unit of 10 minutes, an average value during the 10 minutes was determined as the measurement of each category. However, the maximum instantaneous wind velocity was determined on the measurement with the minimum observation time unit of 2 seconds. The annual average wind velocity was 4.8 m/s, the maximum wind velocity during the period was 35 m/s, the prevailing wind direction was NW-WNW and ESE-SEW, and the occurrence rate of wind direction at the wind axis of NW-SE was 88.1%. The intensity of turbulence was 0.24 at a wind velocity of 2.0 m/s or above and was 0.20 at 4.0 m/s or above. An estimated annual operation rate of a windmill was 46-64% using the rated value of a 150 kW, 300 kW and 750 kW class windmills. (NEDO)

  9. Report on the field test project for wind power development at Yugawara Town (wind characteristics investigation); Yugawaramachi ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    Wind characteristics are observed in the period November 1997 through October 1998 at Yugawara Town, Kanagawa Prefecture. The average wind speed is 5.1m/s and 5.0m/s at 20m and 10m above ground, respectively, suggesting that the difference in altitude causes but a very small difference in wind speed and that a large wind speed component exists in the vertical direction. Under the 16 compass point system, the wind direction occurrence rate is the highest in the NE direction and the second highest in the W direction. The two directions are prevalent, and their occurrence rates on the wind axes total 62.6%. The occurrence rate of wind speeds of not less than 5m/s is 40%. Turbulence intensity is 0.23 and 0.17 for the average wind speed of not less than 2m/s and for the average wind speed of not less than 4m/s, respectively, suggesting but a little impact of air current turbulence. The amounts of energy to be acquired by wind turbine systems of 150kW, 300kW, and 750kW are estimated at 301,363kWh, 651,593kWh, and 1,668,825kWh, respectively. Their annual capacity ratios are 22.9%, 24.8%, and 25.4%, respectively. Since difference in wind speed due to difference in altitude is small, it is supposed that the wind speed at the hub altitude is not so high. It is inferred consequently that service operation will be quite difficult to realize. Difficulties will be also encountered in relation to the route of turbine system transportation, power distribution line, and the distance to a transformation station. (NEDO)

  10. Fiscal 1999 technical survey report. Basic survey of prioritized fields in South Asia (Bangladesh); 1999 nendo Minami Asia chiiki (Bangradesh) energy tashohi sangyo kiso chosa jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For working out and proposing project themes optimum for the popularization of technologies for effectively utilizing energy in Bangladesh, a basic survey was conducted into Bangladeshi energy policy, trend of supply and demand, steelmaking industry, cement making industry, and chemical fertilizer making industry. Bangladesh in fiscal 1997 consumed 10-million tons of energy in terms of oil, 60% or more in natural gas (domestic), 20% in oil, and the remaining 20% in others. Approximately 15% of all the households were supplied with electric power. There was no integrated production plant in the steelmaking industry. Only one mill performed calcination in the cement making industry. The impact to be imposed by the steelmaking and cement making industries on Bangladeshi energy consumption would be small. Fertilizer making was an important industry outputting 2.6-million tons, responsible for 30% of natural gas consumption. The highest priority was given to facility rehabilitation and production enhancement, and there was little hope that energy conservation facilities/technologies would be introduced into the steelmaking and fertilizer making industries. It was possible, however, that the horizontal tube mill would be replaced by a vertical roller mill in the cement making industry. (NEDO)

  11. FY 1999 report on the survey of the international joint research project on medical welfare equipment; 1999 nendo iryo fukushi kiki kokusai kyodo kenkyu jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of internationally cooperating in the R and D of medical welfare equipment, visits were paid to Australia and the U.S. to survey the related administration/research institutes/medical welfare facilities. Australia is a world leader of heart (transplant) operation, organ transplant, artificial middle ear, apneic relaxation equipment, ophthalmological equipment, bio-materials, etc. The country wants to positively promote the international cooperation with Japan because both countries are complementary to each other. Starting about 1999, the U.S. entered the age of competition of the R and D with the use of genome, and the post-genome age is already beginning there. A number of ventures are running for creation of new industry. As to the U.S. government's measures taken for subsidy, regulation, etc. toward new industry, the information could be obtained from the persons concerned. The impression of a tour of welfare facilities in the U.S. was that hardware/software are systematically prepared there, and the aged live bright and positive lives and enjoy lives. (NEDO)

  12. Report on the field test project for wind power development at Soyo Town (wind characteristics investigation); Soyomachi ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    Wind characteristics are observed for a year at Soyo Town, Aso-gun, Kumamoto Prefecture. The annual average wind speed is 5.9m/s and 5.6m/s at 20m and 10m above ground, respectively, satisfying the reference values of 5.6m/s and 5.0m/s. The prevalent wind direction is WNW (occurrence rate: 32.8%). The wind from the directions with WNW at their middle occupies 75%, stable and satisfying the reference value of 60%. Strong winds come frequently from the direction of high occurrence, which is advantageous in arranging plural wind turbine systems. The exponential index in the wind speed vertical distribution is 13.3, but wind distribution is not simple at a mountain top site like the observation station in this report. Wind characteristics are similar to those at places with mild inundations, and the maximum instantaneous wind speed of 40.8m/s will not pose a problem. The wind energy density is 205W/m{sup 2}, satisfying the reference value of 150. Wind power systems of 150kW, 300kW, and 750kW are assumed. When the exponential index is 13.3, their annual operation rates will be 70%, 71%, and 82%; and their capacity ratios are 22.6%, 23.9%, and 22.9%, all satisfying the reference values. They will collect 297MWh, 629MWh, and 1507MWh of wind energy per year. It is concluded that Soyo Town is fully qualified as a site for wind power development. (NEDO)

  13. Regional new energy vision formulation project for Ukiha Town. Fiscal 2001 report (Summary); 2001 nendo Ukiha machi chiiki shin energy vision sakutei tou jigyo hokokusho (Gaiyo ban)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For contributing to the preservation of the global environment through new energy application and energy conservation, efforts were made to work out a new energy vision for Ukiha Town, Fukuoka Prefecture. Town's population was 17,482 in fiscal 2000, which showed a tendency to decline slowly. The town demands 158,886 drums/year in terms of crude oil - 56.2% in electric power, 19.5% in gasoline, and 10.5% in gas oil. As for the presence of new energy resources, wind power comes in first in terms of magnitude, and woody biomass energy is also found in abundance since lumbering prospers in the town. Named as candidate projects in the efforts to introduce new energies were the embodiment of practical size wind power systems in the hilly part; heat utilization and power generation using biomass such as scrap wood from lumber mills; introduction of photovoltaic power into public facilities; use of clean energy vehicles by the town office; photovoltaic power generation and solar heat utilization at welfare facilities and public gymnastic halls; street lamps lighted by hybrid power systems in the shopping area and at the Michinoeki roadside service spot; use of new energies in agriculture; financial aids to encourage photovoltaic power into general residences; etc. (NEDO)

  14. Report on the field test project for wind power development at Yaku Town (wind characteristics investigation); Yakumachi ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    Wind characteristics are observed for a year at Yakushima Young Travellers' Village of the above-named town, Kagoshima Prefecture. The exponential index of the wind speed distribution in the vertical direction is between 1.6 and 4.7, or 3.5 on the average, relatively small due probably to the peculiar terrain and causing no trouble in the development. Turbulence intensity is 0.16 at when the wind speed is 2m/s or more, low enough to meet the reference value (0.30 or less). The total occurrence rate on the prevalent wind axis (SSE-NNW) is 48%, falling short of the reference value (60% or more). The average wind speed in the prevalent wind direction is high and the wind energy density concentrates on the prevalent wind axis, this showing that the site is good for wind power development. The annual average wind speed is 5.6m/s, slightly lower than the reference value (5.8m/s or more). Since there are possibilities of a maximum instantaneous wind speed of over 60m/s, caution is to be used in determining the wind endurance level for the wind turbine design. The annual wind energy density is 325W/m{sup 2}, fully meeting the reference value (215W/m{sup 2} or more). The annual operation rates of the 150/300/750kW wind turbine models are 61/65/80%, and these meet the reference value (45% or more). Their annual capacity ratios are 24.5/26.6/27.7%, and these again meet the reference value (17% or more). (NEDO)

  15. Fiscal 1999 technical survey report. Green Helmet Project (China, Steel industry - Coal moisture control facilities); 1999 nendo green helmet jigyo (Chugoku seitetsugyo) sekitan choshitsu setsubi chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of meeting the needs of Chinese steelmaking corporations disclosed at an energy conservation diagnosing session of a Japan-China steelmaking energy conservation seminar held in July 1999, Japanese specialists were sent to Chinese steelmaking plants, namely, Benxi Iron and Steel (Group) Complex, Wuhan Iron and Steel (Group) Company, and Nanjing Iron and Steel Works. They described the CMC (coal moisture control) technique for its popularization and for effectively utilizing the same for coke ovens. Also, feasibility studies were conducted for CMC installation at the respective plants. Engineers were invited from the Chinese plants to Japan for the observation of associated facilities and for the exchange of opinions. As the result, leading members of the Chinese steelmaking plants now learned the usefulness of CMC. In the feasibility studies, CMC installation led to a reduction in dry distillation energy, that is, a reduction in the amount of fuel gas required, to an improvement on coke production, and to the selection of the fluidized bed dryer as the optimum system. At Chungching Iron and Steel Works, the existing CMC facilities were not in continuous operation because of an inclined conveyer failure, yet there was a strong will to utilize the CMC technique. (NEDO)

  16. Fiscal 2000 survey report on rationalization project for international energy conservation, technological dissemination project for international energy conservation, and Green Helmet Project. Japan-China alternative energy seminar/waste disposal; 2000 nendo kokusai energy shiyo gorika nado taisaku jigyo, kokusai energy shohi koritsuka nado gijutsu fukyu jigyo, green helmet jigyo chosa hokokusho. Nicchu sekiyu daitai energy seminar haikibutsu shori

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    This paper explains the Japan-China alternative energy seminar (February 28 and March 1, 2001, at Beijing). The purpose of the seminar is to introduce systematic and three-dimensional or land/sea/air measures for waste disposal including recycling in Japan, to provide guidance of measures in improving recognition and methods for waste disposal in China, and also to contribute to the dissemination and promotion of a model project for effectively utilizing waste heat from rubbish incineration, a project being implemented in Harbin City now. The activities of NEDO were introduced, with emphasis placed on a model program, called Green Aid Project, for managing heat from waste incineration. On the subjects of sustainable development, urban environment, and energy, the policy of China's tenth five-year plan was demonstrated, and the treatment of wastes in China was also explained. The present state of waste processing in Japan was introduced, as was its maintenance of the facilities. Concerning Japan's waste processing technologies and characteristics of the equipment, there were presented non-incineration processing including crushing/separating, RDF, compost, methane fermentation, etc.; incineration plants; and each of the technologies such as combustion, exhaust gas, ash treatment, use of remaining heat, and gasification melting. (NEDO)

  17. Fiscal 1999 research on geothermal energy development promotion. Research report on development feasibility (Strategic survey - nationwide survey); 1999 nendo chinetsu kaihatsu sokushin chosa hokokusho. Kaihatsu kanosei chosa (senryakuteki chosa zenkoku chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-10-01

    Analysis and assessment were conducted for each of promising geothermal regions over large areas so as to contribute to the drafting of survey implementation plans and estimation of the amounts of recoverable geothermal reserves under the geothermal energy development promotion project. In this fiscal year, based on the manual compiled in the preceding fiscal year, studies were made on the six areas, which were the eastern part of Hokkaido, Toyoha-Niseko area, Iburi area, Bandai-Azuma area, Minamiaizu-Nasu area, and the island area. In region 1 in the eastern part of Hokkaido, a 48km{sup 2} was extracted in the vicinity of Mount Musa, with the amount of resources per 1km{sup 2} estimated at 12.34-56.02MWe. In region 2 in the eastern part of Hokkaido, promising geothermal regions I, II, III, and IV were extracted, with the amounts of resources per 1km{sup 2} estimated at 50MWe or more at III and part of IV. In the Toyoha-Niseko area, promising regions I and II were extracted, the amounts of resources estimated at 50MWe or more in both regions. For the Iburi area, it was concluded that there was a probability of not less than 90% that the amount of resources was 50MWe or more and it was proposed that an additional survey be conducted. As for the Bandai-Azuma, Minamiaizu-Nasu, and island areas, need of further surveys was pointed out. (NEDO)

  18. Report on the project for working out the new energy vision of the Iwasaki village area; 2001 nendo Iwasaki mura chiiki shin energy vision sakutei tou jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For the purpose of promoting the introduction of new energy and enhancing the awareness of it at Iwasaki Village, Aomori Prefecture, an investigational study was conducted of the energy demand of the town, existence amount of new energy, introduction of new energy, etc., and a new energy vision was worked out. The population of Iwasaki Village was 2,845 as of October 2000, which decreased approximately 30% in the past 20 years. The energy demand of the whole village was about 280,000 GJ in amount (about 7,202 kL/y in crude oil conversion), consisting of kerosene, light oil, heavy oil, gasoline, electric power and LPG. As viewed by sector, the rate of energy demand in the commercial/residential sector was comparatively high. As the project for new energy introduction, the following were studied: wind power generation around the Yamamori plain/Iwasaki village office; snow melting system using soil heat exchanger on the road in front of elementary school, photovoltaic power generation for public facilities (elementary and junior high schools/house of recreation and relaxation for old people/day nursery)/Tsugaru Semi-national Park/general houses; wave power generation at the Iwasaki fishing port; introduction of clean energy vehicles to public facilities; utilization of ligneous biomass energy, etc. (NEDO)

  19. Wind power development field test project at Rokkasho-mura, Aomori prefecture. Close survey on wind conditions; Aomoriken Rokkashomura ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A survey was made on wind conditions in Rokkasho-mura, Kamikita-gun, Aomori prefecture, on the assumption that a wind power generation system was installed therein. The survey period was one year from Oct., 1998 to Sept., 1999. The observations were carried out on the average wind velocity, average wind direction, standard deviation of velocity, and the maximum instantaneous wind velocity. With a fixed point observation at 20 m above ground, and with the minimum observation time unit of 10 minutes, an average value during the 10 minutes was determined as the measurement of each category. However, the maximum instantaneous wind velocity was determined on the measurement with the minimum observation time unit of 2 seconds. The annual average wind velocity was 4.6 m/s, the maximum wind velocity during the period was 26.0 m/s, the prevailing wind direction was NW (20.8%), WNW (18.0%), and SE (13.5%), and the total occurrence rate of wind direction at the wind axis of NW-SE was 75.7%. The intensity of turbulence was 0.25 at a wind velocity of 2.0 m/s or above and was 0.21 at 4.0 m/s or above. An estimated annual operation rate of a windmill was 59-72% using the rated value of a 150 kW, 300 kW and 750 kW class windmills. (NEDO)

  20. Research report. Environmentally friendly energy community research business for Fujieda district (Refuse energy utilization); Fujieda chiku kankyo chowagata energy community chosa jigyo (haikibutsu energy riyo shisetsu) chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    An environmentally friendly refuse energy utilizing business, for which RDF (refuse derived fuel) produced out of wastes discharged by industries belonging to a Fujieda city environmental protection council will provide the heat source, is proposed by the said council. The proposal is subjected to a study, a basic plan is drafted, and a decision is made on its profitability. In the study, surveys are conducted on the actualities of wastes and of demand for heat, and specifications are worked out relating to transportation and storage of RDF, production of steam by an RDF-fired boiler, routing of pipes for transmitting the steam to the industries in the district, facility costs, operating costs, etc. It is found that the amount of RDF produced out of the wastes discharged by the council member industries is so small that it can meet the demand of only one industry and that, even if more wastes are collected from a wider area, the increased amount will but meet the demand of two industries and a hot water pool. It is found that the system will be economically feasible, however, if the shortage of RDF-generated energy is covered by an oil-fired boiler and thereby impartiality is established in steam distribution and steam production unit price is reduced. In view of the intensification of control over dioxin, etc., the business will be gaining profit in 2002 and after. (NEDO)

  1. Wind power development field test project at Aoyama Heights, Aoyama-cho. Detailed wind characteristics survey; Aoyamacho Aoyama Kogen ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A detailed wind characteristics survey was conducted at Aoyama Heights, Aoyama-cho, Naga-gun, Mie Prefecture, on the assumption that a wind power generation system would be constructed. The survey was a 1-year project from October 1998 through September 1999, and wind characteristics such as the average wind speed, average wind direction, standard deviation of wind velocity, and the maximum instantaneous wind speed were observed. The observation point was fixed at 20m above ground, the minimum time unit for observation was 10 minutes, and the 10-minute average value was defined as the measured value. For the maximum instantaneous wind speed, the minimum time unit for observation was set to be 2 seconds. The yearly average wind speed was 5.3m/s and the maximum wind speed in the period was 32m/s. Winds came prevalently from WNW (31.6%), and then from NW (16.8%), ESE (20.9%), and E (9.9%). The wind axis was in the direction of WNW-ESE, and the total wind direction occurrence rate was 89.0%. Turbulence intensity was 0.25 at wind speed 2.0m/s or more and 0.23 at wind speed 4.0m/s or more. Estimated wind turbine yearly operating factors of 70-84% were obtained using rated values of a 150kW, 300kW, and 750kW-class wind turbines. (NEDO)

  2. Report on the project for working out the new energy vision of the Genkai town area; 2001 nendo Genkai machi chiiki shin energy vision sakutei tou jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For the purpose of promoting the introduction of new energy and enhancing the awareness of it in Genkai Town, Fukuoka Prefecture, an investigational study was conducted of the estimated amount of energy demand of the town, existence amount of new energy, project for new energy introduction, etc., and a vision was worked out. The energy consumption amount of the town in FY 1999 was estimated at 834 TJ/y. By sector, it consisted of 299.31 TJ in the industrial sector, 282.08 TJ in the transportation sector and 252.78 TJ in the commercial/residential sector. By energy source, the rate of light oil was the highest, followed in order by gasoline, electric power, kerosene, LPG, etc. As the project for new energy introduction, the following were studied: preparation of disaster-prevention type photovoltaic power generation at shelter, etc.; introduction of photovoltaic power generation to kindergarten, elementary school, etc.; introduction of photovoltaic power generation to street light, tourist information center, etc.; introduction of wind power generation to public facilities; use of the waste cooking oil made into diesel fuel for official vehicle; introduction of cogeneration to the health welfare hall; solar light/heat utilization system for residential/industrial use; wind power generation business for business establishment. (NEDO)

  3. Fiscal 2000 report on cooperative basic project on international energy consumption improvement/International conference project such as IPCC. International Symposium on the Kyoto Mechanisms; 2000 nendo kokusai energy shohi koritsuka nado kyoryoku kiso jigyo / IPCC nado kokusai kaigi jigyo Kyoto mechanism ni kansuru symposium hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    The above-named symposium was held at United Nations University in the period April 12-13, 2001, and the conference is outlined in this report. The symposium aimed to contribute to the progress of international rule making and to the enhancement of mutual understanding through the exchange of views and opinions by negotiators representing their countries over the Kyoto mechanisms, the rule of emissions trading in particular, and through the analysis of negotiators' options; to discuss how international rules should be from a practical viewpoint with the participation of people related to the market or industries and engaged actively in the implementation of the mechanisms; to enrich Japanese people's knowledge about the mechanisms and to enhance their understanding of greenhouse gas emissions reduction techniques making use of the mechanism of the market; and so forth. The conference included Session 1: Current status of international negotiations and views from parties, Session 2: Toward credible and workable scheme of the mechanisms (Parts 1 and 2), and Session 3: Emissions trading - Outstanding issues and options. (NEDO)

  4. FY 2000 report on the coal resource development basic survey (information collection analysis project). Cooperative project on the open-cut coal mine rehabilitation technology; 2000 nendo sekitan shigen kaihatsu kiso chosa (joho shushu kaiseki jigyo) hokokusho. Rotenbori sekitan saikutsu atochi shufuku gijutsu kyoryoku jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    At the Ensham open-cut mine in Australia, an investigational survey was conducted of a new rehabilitation technology which can contribute also to securing CO sink with the aim of preventing global warming, and the FY 2000 results were summed up. In the survey, the surface soil, sand silt layer, brown rock layer, gray sandstone layer and coal seam were moved from open pits, the goaf was embanked, and the experimental section was set up. As to the place for test, conducted were collection of information on adaptive plant species, bacterium species, meteorology and precipitation pattern, soil analysis, etc. Concerning the bacteria, bacteria were newly separated and tested at the survey site, besides the species to be tested. After planting, measurement of the growth amount of plants, etc. were conducted grasping the meteorology and the water-pouring state during cultivation. For the basement, three kinds of spoils were used, and permeability is different in each spoil. Permeability is an important factor to plants. Too good permeability and too bad permeability are both not good. A future follow-up survey will make what kind of spoil is suitable for eucalypti possible. (NEDO)

  5. FY 1999 Feasibility study on the environmentally-friendly coal utilization systems. Green Helmet Project (Circulating fluidized bed boiler Zaozhuang, Shangdong Province, China); 1999 nendo kankyo chowagata sekitan riyo system kanosei chosa jigyo seika hokokusho. Green helmet jigyo (junkan ryudosho boiler Chugoku Shangdong sho Zaozhuang)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The demonstration project is carried out in at Chaili coal mine in Shangdong Province, China for installation of and dissemination activities for circulating fluidized bed boilers to abate sulfur oxide emissions associated with utilization of coal, and the FY 1999 results are reported. The operating conditions were reviewed, and some recommendations were made for improving the operation procedures. Limestone was not used for desulfurization, and furnace temperature tended to increase due to increased size of the fluidizing particles. Therefore, it was recommended to use limestone at the design rate. The boiler was operated at a load exceeding the design level, and it was recommended to limit the load viewed from extending serviceability. The boiler start-up procedure was concretely proposed to use a mixed fuel of wood and coal instead of distillate oil, in order to reduce the start-up cost. The recommendations and design support activities for improving facilities included early stage repair of the damaged refractories. For build up of the ashes in the horizontal heat transfer section, the investigated design charts for improvement by installation of ash-discharging hopper were drawn and proposed. Maintenance-related information was given, including Chinese agencies for obtaining auxiliary facilities. (NEDO)

  6. Fiscal 2000 report on cooperative basic project on international energy consumption improvement/International conference project such as IPCC. International Symposium on the Kyoto Mechanisms; 2000 nendo kokusai energy shohi koritsuka nado kyoryoku kiso jigyo / IPCC nado kokusai kaigi jigyo Kyoto mechanism ni kansuru symposium hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    The above-named symposium was held at United Nations University in the period April 12-13, 2001, and the conference is outlined in this report. The symposium aimed to contribute to the progress of international rule making and to the enhancement of mutual understanding through the exchange of views and opinions by negotiators representing their countries over the Kyoto mechanisms, the rule of emissions trading in particular, and through the analysis of negotiators' options; to discuss how international rules should be from a practical viewpoint with the participation of people related to the market or industries and engaged actively in the implementation of the mechanisms; to enrich Japanese people's knowledge about the mechanisms and to enhance their understanding of greenhouse gas emissions reduction techniques making use of the mechanism of the market; and so forth. The conference included Session 1: Current status of international negotiations and views from parties, Session 2: Toward credible and workable scheme of the mechanisms (Parts 1 and 2), and Session 3: Emissions trading - Outstanding issues and options. (NEDO)

  7. FY 2000 report on the results of the project for the promotion of industrial technology development for the global environment. Project on the investigational research of high technology; 2000 nendo NEDO seika hokokusho. Chikyu kankyo sangyo gijutsu kaihatsu suishin jigyo - Sentan gijutsu chosa kenkyu jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    High-tech study was conducted for fields of CO2 fixation/effective utilization, technical development of low environmental load substances and technical development of environmentally friendly type production process, and the FY 2000 results were summarized. Out of the proposals for research projects collected in FY 1999, 25 projects that were recognized to be excellent were consigned to contract research. Research Institute of Innovative Technology for the Earth also selected 4 projects for research. Through research activities, 179 projects were made public, and 2 patents were applied for. The number of research themes was 29 including the following themes: development of food resource resistant to the future global environment, study on new circulation type polymer chemical recycling by bio-process, development of dioxin decomposition technology using artificial enzyme and absorption resin, design of rare metal free cathode substance for large lithium ion secondary battery, and reforming of carbon circulation system in the Australian desert by natural humus supply. (NEDO)

  8. Fiscal 2000 project for promoting international cooperation for global environment. International information network project for global environment (Survey on information network for environmental technology transfer); 2000 nendo chikyu kankyo kokusai kyoryoku jigyo hokokusho. Chikyu kankyo kokusai joho network jigyo (kankyo gijutsu iten joho network chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Environmental technology information database has been shown on Internet for the purpose of transferring environmental technologies; in order to reinforce it this year, a viewpoint was directed to developing countries, with research carried out on the environmental preservation information of the Philippines and Thailand. In the research, in view of promoting cleaner production in developing countries, UNEP regional offices, which are active in the operation, and Asian Development Bank were examined, with their methods, plans and strategies of disseminating the cleaner production surveyed. Also, the database was added with the activities by the organizations concerned in Philippines and Thailand. As for the environmental management system ISO14001, some local governments in Philippines and Thailand will presumably acquire ISO14001 in the future to deal with their environmental management; under the circumstances, Miyama Town was chosen that was first in Mie Prefecture to obtain ISO14001, with the details investigated concerning its environmental policy and the acquisition of ISO14001; and, on the basis of the investigation, a database was prepared so that guidelines for environmental management were provided for the local governments. (NEDO)

  9. Overall analysis report on the fiscal 1994 geothermal development promotion survey. No.C-2. Wasabizawa area (secondary); 1994 nendo chinetsu kaihatsu sokushin chosa sogo kaiseki hokokusho. No.C-2. Wasabizawa chiiki (dainiji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The Wasabizawa area is located near the boundary between Yuzawa city south of Akita pref. and Ogachi-machi, Ogachi-gun, Akita pref, having a range of 3.0km northeast-southwest and 2.5km northwest-southeast of Wasabizawa almost as a center. The area for survey and its circumference are national forests, and the east and a part of the south of the area are designated as the Kurikoma quasi-national park third type special region. From the geochemical temperature distribution, it can be assumed that geothermal fluids of around 300{degree}C exist in the deep underground of the Kaminotai-Wasabizawa-Akinomiya area. From the distribution of density basements, the block structure of the basement can be estimated. Around the boundary of the ridge/sedimentation region of this density basement, fractures develop and the formation of reservoir structure is expected from the comparison with the result of the well survey. In the blowout test, obtained were 284.3{degree}C and 83.05 kgf/cm{sup 2} at a depth of 1,300m. In the geothermal system, it is assumed that reservoir structures of geothermal fluids develop in the deep underground of the central part of the area. The heat source to the geothermal system is supposed to be the magma reservoir remaining in Takamatsudake volcanic rocks. 110 refs., 177 figs., 105 tabs.

  10. Fiscal 1999 survey report. Survey of environmental effect pertaining to survey for geothermal development and promotion (Hakusuigoe area); 1999 nendo chinetsu kaihatsu sokushin chosa no uchi kankyo eikyo chosa (Hakusuigoe chiiki) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This survey of environmental effect was intended to grasp actual state concerning some environmental factors that should agree with survey/development and also to assess its effect on the surrounding environment, particularly as a part of the 'stage C' in the 'survey for geothermal development and promotion', which was implemented by the Government for the purpose of guiding geothermal development by enterprises. This report compiles the plan details of the environmental effect survey to be conducted in the Hakusuigoe district, and presents proposals. The survey area is in the north of Makizono-cho, Aira-gun, in Kagoshima prefecture and situated about 3 km west of Onaminoike in Karakunidake, one of the peaks in the Kirishima mountain range. The Ogiri geothermal power plant is in the west of the site, a tourist spot Ebino Heights about 4 km northeast, and the Kirishima hot-spring about 4 km southeast. The location is in the national park, with a part designated as No. 2 and 3 class special areas. The environmental effect survey was divided broadly into such categories as fauna/flora, hot-spring water alteration and inland water, landscape, noise/vibration/subsoil, and air/water, and was further subdivided in accordance with the actual operations. (NEDO)

  11. FY 1996 geothermal development/promotion survey. Report of hot water survey results (No. B-3 Kumaishi area); 1996 nendo chinetsu kaihatsu sokushin chosa. Nessui no chosa hokokusho (No.B-3 Kumaishi chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    Reported herein are the survey results of hot water in the Kumaishi area, Hokkaido, as part of the FY 1996 geothermal development/promotion survey project. A total of 277 spouting guidance tests were conducted by the swabbing method for 10 days at the N7-KI-1 well, which, however, failed to achieve continuous spouting of geothermal fluid. A total of 144 swabbing tests were conducted for 8 days at the N7-KI-2 well. The geothermal fluid is spontaneously spouted out, although intermittently, after the main valve was opened, because it had a pressure of 4.1 kg/cm{sup 2} G at the mouth of the well from the first. However, the final self-spouting quantity remained unchanged in spite of the guidance works. The hot water had a pH 6.4, and contained Na as a cation at 8,940 mg/L and Cl as an anion at 14,500 mg/L as the major impurities. The associated gas was mainly composed of carbon dioxide, containing little hydrogen sulfide. The hot water spouted out through the wells contained Na and a high concentration of Cl as the major impurities, suggesting possibility of mixing hot water containing a high concentration of salt with surface water. It is considered that neither hot water nor its impurity concentrations are evenly distributed in the deep underground of the Kumaishi area. It is therefore considered that the deep underground hot water sources for hot spring slightly vary in composition and impurity concentrations. (NEDO)

  12. Fiscal 1998 survey for geothermal energy development promotion. Environmental impact survey report (No. B-7 Kuwanosawa region); 1998 nendo chinetsu kaihatsu sokushin chosa. Kankyo eikyo chosa hokokusho (No.B-7 Kuwanosawa chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    This survey aims to learn the current states of environmental factors required for the comprehension of the impacts on surroundings of a structural boring for geothermal energy exploration. The target site is an approximately 10km{sup 2}-large area located among the mountains 20km south-south-east of Yuzawa City, Akita Prefecture. It is found that numerous animals and vegetables inhabit the Kuwanosawa region and its vicinity. They are 19 species of mammals in 10 families under 5 orders; 73 species of birds in 25 families under 10 orders; 6 species of reptiles in 13 families; 9 species of amphibians in 6 families under 2 orders; and 719 species of insects in 179 families under 17 orders. Valuable animals include flying squirrels, mandarin ducks, black salamanders, and small Gifu butterflies. There are 670 species of vegetables in 132 families. Valuable vegetables are Iinuma bulblets, wild rhubarb roots, and Amur adonises. Floras found in existence are a natural flora in the beech class area, compensatory flora in the beech class area, afforested area, and a flora in the crop land. No remarkable fluctuation was observed in the Takamatsu spa throughout the survey period. Fluctuations were observed in all the survey items at the Doroyu-Okuyama inn. (NEDO)

  13. Report of base consolidation promotion survey of overseas coal import in FY 1993. Feasibility survey of effective utilization of coal ash; 1993 nendo kaigaitan yunyu kiban seibi sokushin chosa. Sekitanbai yuko riyo jigyo no feasibility chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    This report describes the effective utilization of coal ash discharged from general industry (general industry ash) as improving material of construction waste soil and deodorant for poultry industry. Coal ash is characterized by the pozzolan and self-hardening properties which are not shown in soil and sand. Coal ash having a large amount of free CaO in its composition has stronger such properties. Coal ash generated from fluidized bed combustor which is a kind of combustor of coal contains a large amount of free CaO, especially, resulting in the stronger such properties. On the other hand, coal ash has water and oil absorbing property due to its porous structure. To utilize these properties, the improving material of soft construction waste soil and deodorant for poultry industry have been selected. As a result of laboratory and field tests for the former, it was found that sufficient supporting force can be obtained. Since the protection of powder splash is required at the site, a humidification system has been developed, which can protect the splash by the humidification of 5%. The price between 500 and 1,000 yen/ton is suitable for the improving material of construction waste soil. The maximum price of the deodorant for poultry industry is 10 yen/kg. 14 refs., 40 figs., 49 tabs.

  14. Research report for fiscal 1998. Research for 'New Earth 21' project implementation program preparation; 1998 nendo chosa hokokusho. 'Chikyu saisei keikaku' no jisshi keikaku sakusei ni kansuru chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    For the establishment of a CO2 measures introduction scenario which the world would accept, the latest information was collected, the DNE21 (Dynamic New Earth 21) model was improved, and simulation was reviewed. In fiscal 1998, simulation was performed for each district using an LDNE21 (Linear Dynamic New Earth 21) model, and an energy flow chart, energy balance table, and trade table were prepared and subjected to detailed deliberation. Studied were also conducted about the changes to occur in methanol production when the natural gas reserves and plant cost data were given different values. In the DNE21 model, the 'macro economy model' and 'warming damage function' were integrated, and simulation was performed for verification. Using a standard model compatible with COP3 (Third Session of the Conference of the Parties to the United Nations Framework Convention on Climate Change), comparison was made between a case in which different CO2 emission constraints were imposed on the advanced area and developing area separately and a case in which one and the same constraint was imposed on the world as a whole, and calculations were made about CDM (Clean Development Mechanism). (NEDO)

  15. FY 2000 Project report on survey for drawing district energy-saving visions for City of Oguchi; 2000 nendo Oguchi-shi chiiki sho energy vision sakutei nado jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    The energy-saving visions are drawn for City of Oguchi to help spread the energy-saving practices through the citizens, based on the studies on more efficient and realizable energy-saving measures, including effective utilization of district energy. The energy-saving activities cover the following 6 areas: (1) energy demand trends and current status of energy-saving measures, (2) basic environmental conditions related to energy saving in the district, (3) prediction of energy demands, (4) basic conception of the district energy saving, and introduction methodology, (5) energy-saving implementation plans, and (6) promotion of and problems involved in introduction of the energy-saving measures. The energy-saving implementation plans cover the public facilities, household, schools and private enterprises, and the energy-saving measures studied for the public facilities include introduction of microhydroelectric power generation systems for service water and sewer systems, revolving doors for libraries, high-efficiency illumination systems, and various types of solar systems. Those for household include economic utilization of home electric appliances and automobiles, and those for cooperation by the administration and citizens include thorough separation of garbage. (NEDO)

  16. Report on a wind power development field test project (detailed wind condition investigation) in the city of Choshi; Choshishi ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    This paper describes observation on the annual wind condition at the Yokka-ichibadai in the city of Choshi. The average wind velocities were 4.7 and 3.8 m/s at the ground height of 20 and 10 meters, respectively, not having reached the NEDO's criterion values 5.6 and 5.0 m/s. The annual wind direction emergence rate on the wind axis was 70%, meeting the criterion value of 60% or higher, and the wind direction is stable. The exponent for the vertical wind velocity distribution was 3.3, which is similar to that in the urban area. Disturbance in the wind condition was 0.18, meeting the criterion value of 0.30 or lower. The maximum momentary wind velocity was 31.9 m/s, which is well below the criterion of 60 m/s presenting no problem as a wind mill construction site. The wind energy density was 94 W/m{sup 2}, being only 63% of the criterion value, when all the azimuths were used as the object. The result of the investigation is that the average wind velocity is low and the wind energy density is also low. However, if the size of wind mill to be introduced is set to the class B (300 kW), it is possible to attain an annual operation rate of 58%, an annual energy acquisition amount of 515 MWh, and a facility utilization rate of 19.6%. If set to the class C (750 kW), an operation rate of 78%, an annual energy acquisition of 1296 MWh, and a facility utilization rate of 19.7% can be obtained, meeting the criterion value. (NEDO)

  17. Report on the project for working out the new energy vision of the Shime town area; 2001 nendo Shime cho chiiki shin energy vision sakutei tou jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For the purpose of promoting the introduction of new energy and enhancing the awareness of it in Shime Town, Fukuoka Prefecture, an investigational study was conducted of the state of energy consumption of the town, existence amount of new energy, project for new energy introduction, etc., and a vision was worked out. The rate of electric power demand of the town consisted of 44% of the residential sector such as general household, the highest, 30% of the business sector such as business office and 21% of the industrial sector such as plant. The demand from the industrial sector was on the decrease. The sales amount of domestic use gas almost leveled off. As the project for new energy introduction, the following were studied: introduction of photovoltaic power system to the Shime town office/townspeople center/elementary school/junior high school; introduction of solar heat utilization system to the welfare center for old people; introduction of wind power/photovoltaic power hybrid street light to school road/cycling road/playground; heat pump space heating/cooling using temperature different energy of the water of mine roadway; introduction of clean energy vehicle to the town office; introduction of photovoltaic power generation/solar heat utilization/hybrid car to general houses. (NEDO)

  18. Fiscal 1997 report on the environment friendly type coal utilization technology transfer project. Downstream field; 1997 nendo gyomu hokokusho. Kankyo chowagata sekitan riyo gijutsu iten jigyo (karyu bun`ya)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    For the purpose of supporting the introduction/spread of clean coal technology (CCT) in countries in Asia and the Pacific, engineers of the countries concerned were invited to Japan aiming to ferment the understanding of CCT and improve abilities of them. The project was carried out by NEDO, and managed by CCUJ. It has two courses. The manager course is for policy makers, management and senior managers. By assessing CCT and presenting a menu for economical efficiency, environmental arrangement for CCT introduction is made in working out policies and planning plant/equipment investment in the future. The engineer course is for policy planners, mid-class managers and senior engineers. It proposes data on which to base a decision in working out/planning CCT facilities, and at the same time ideas by which to reduce environmental loads by management of facilities, simple improvements, etc. The number of the persons invited are 21, that is, 8 from China, 5 from Indonesia, 4 from the Philippines and 4 from Thailand. After the training, future subjects were summed up

  19. Fiscal 1999 technical achievement report. Development project on international standards for developing new industry (Comprehensive research); 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Sogo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Research and development of 13 individual subjects whose achievements are expected to come into use on the international scale was started in fiscal 1998, to be completed in three years. Progress is reviewed for each of the subjects, and the findings are mentioned below. Research and development is progressing smoothly, specifications to be internationalized have been narrowed down, and it is now foreseen that the main points of the specifications to be presented will be successfully prepared. There are some subjects, however, about which it is difficult to specify to which technical committees they are to be submitted. Assistance, for instance supply of information, by technical committees involved is indispensable. The attitude toward international standardization taken by European and American business corporations visited for study by Japanese researchers is to be disseminated to Japanese business corporations since the information thus collected will help them. Although 75% of the 13 subjects have reached a level where they may be presented as specifications for international standardization, yet they need active support by organizations concerned and research of trends of internationalization-related institutions before they are actually accepted as international standards. (NEDO)

  20. FY 1998 geothermal development promotion survey. Report on the environmental effect survey (No. A-4 Kunbetsu-dake area); 1998 nendo chinetsu kaihatsu sokushin chosa. Kankyo eikyo chosa hokokusho (No.A-4 Kunbetsudake chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-30

    Of the FY 1998 geothermal development promotion survey, the primary environmental effect survey in the Kunbetsu-dake area was conducted, and the results were arranged. In the well drilling survey, etc., the survey was made aiming at extracting areas to be preserved from an environmental aspect. The results of the survey were summarized as follows: As to the mammalia, 12 families 46 species were confirmed in the area surveyed and the periphery by literature survey. Out of them, the noticeable species which are considered important from an academic viewpoint are 10 families 19 species. As to the aves, 55 families 340 species were confirmed, of which 29 families 79 species are noticeable species. About the amphibia/reptilia, 3 families 3 species in the amphibia and 4 families 6 species in the reptilia were confirmed by literature and hearing survey. The noticeable species is 1 family 1 species in the amphilia. Concerning the terrestrial insecta, 135 families 873 species were confirmed, and the noticeable species is 11 families 20 species. As to the flora, 115 families 1055 species were confirmed, and the noticeable species is 46 families 126 species. Relating to the living vegetation, the one higher than 9 in nature reserves shows a substantial rate, and the periphery of Kaibetsu-dake is designated as the specified flora colony. (NEDO)

  1. Report on the surveys in fiscal 1999 on the summary of new energy proliferation and promotion policies in Germany; 1999 nendo Doitsu ni okeru shin energy fukyu sokushin seisaku no gaiyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper reports the surveys in fiscal 1999 on the new energy promotion policies in Germany. Because of the cold climate condition, eighty percent of household energy consumption is for room heating. Regulations on room heating thermal consumption on new and modified buildings, which were begun in the end of 1979, have accomplished the intended effects. However, the achievements have been deadlocked because of industrial collapse in the East Germany area and the delay in modernizing the prefabricated residential buildings. Because of the current situation in which energy saving is difficult in the consumer department, the federal government has shifted the emphasis to rationalization in the industrial department, which has started voluntary regulation on CO2 discharge. However, no noticeable effects have been seen in the electric power, steel making and chemical industries as have been expected. The limitation in energy saving and the policy of abolishing nuclear power generation on the long term basis (because of safety) have expanded expectation on regenerative energies. The plan calls for bringing up the regenerative energy utilization to 50% ratio by 2050, whereas a utilization promoting program was launched in September 1999. Part of the environment tax (amounting to an annual revenue of 12.5 billion Marks) will be assigned to the financial source for the subsidy measures (1 billion Marks). Legislative amendments are discussed, including review on the electric power purchase law for wind power and photovoltaic power generation systems. (NEDO)

  2. FY 1999 report on the geothermal development promotion survey data processing. No. B-7 Kuwanosawa area (secondary); 1999 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. No.B-7 Kuwanosawa chiiki (dai niji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-10-01

    As a part of the FY 1999 geothermal development promotion survey - Kuwanosawa area, the following were conducted and the results were arranged: ground surface survey (electromagnetic survey, analysis of numerical map), N11-KN-1 structure test boring survey, geothermal water survey, environmental effect survey, supplementary survey related to data processing, and comprehensive analysis. As to the reservoir structure, it seems that the area is low in water permeability from the results that there was seen little lost circulation at the time of drilling N11-KN-1 and that transmission coefficients in the water poring test indicated smaller values than those of the production well. In the underground temperature distribution, the temperature at a depth of 1,800m was 164.5 degrees C, which is lower than that in the neighboring Wasabizawa area. The geothermal water of N11-KN-1 does not have many dissolved constituents, showing alkalescence, which belongs to the Na-HCO{sub 3} type. As to the geothermal water of N11-KN-1, it seems that the meteoric water went down along faults and fractures, was stored in basement rocks and heated by heat conduction to form the geothermal water. In the Kuwanosawa area, there are seen very few geothermal signs on the ground surface, and a possibility seems to be small that high temperature and dominated geothermal fluids are active on a large scale. (NEDO)

  3. FY 1993 report on the survey of geothermal development promotion. Jetting/reduction test (No.36 - Amemasu-dake area); 1993 nendo chinetsu kaihatsu sokushin chosa. Funshutsu kangen shiken hokokusho (No.36 Amemasu dake chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-10-01

    As a part of the survey of geothermal development promotion, the jetting/reduction test using a structure drilling well N4-AM-4 was made in the Amemasu-dake area, Hokkaido, survey was conducted of the state of jetting of geothermal fluid, the state of borehole, analysis of geothermal fluid, etc. The induced jetting was carried out by the Swabbing method in the total number of times of 97 in 10 days. As to the jetting of geothermal fluid, jetting was recognized in a short time from 2 hours 49 minutes to 3 hours 51 minutes, but did not result in the continuous jetting. The mean jetting amount of geothermal fluid was totally 4.03 t/h (0.69 t/h in steam flow and 3.34 t/h in water flow). The temperature of geothermal water while jetting was 90 degrees C, pH was 8.6-8.9, chlorine ion concentration was 520-960 ppm, and electric conductivity was 2.41-3.57 ms/cm. The pressure at the feed point while stopping jetting was 5,800 MPa, and the pressure just before stopping jetting was 1,191 MPa. Chemical components in geothermal water belonged to the alkali C1 type. The geochemical temperature of geothermal water by Na-K temperature was 229 degrees C at maximum and 202 degrees C at minimum. (NEDO)

  4. Report on geothermal development promotion survey data processing in fiscal 1997. Tsujinodake Area No. B-6 (first report); 1997 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. 1. Tsujinodake chiiki No.B-6

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    This paper reports the achievements in the geothermal development promotion survey data processing in fiscal 1997 for Tsujinodake Area. Geological, alteration band and fluid geochemical surveys, gravity and electromagnetic exploration, and environment influence survey were generalized to summarize the state of existence of geothermal resources. Sea water permeated into deep underground portion was mixed with meteoric water from Ikeda Lake and Unagi Pond; heated by deep hot water originated from magma pools as the source of volcanic activities after formation of the Ata caldera; the resultant neutral high salt concentration hot water has risen on the Takeyama-Tsujinodake structural line; and was reserved in deep portion of Mr. Tsujinodake. The sea water permeated into deep underground portion was heated by the same deep hot water originated from magma pools as described above, has risen along the Ata caldera wall, and been reserved in the deep portion of Kaimon Dake Spa. Around the Yamakawa geothermal power plant, the permeated sea water was heated by the same magma pools as described above and by the intrusive rocks originated therefrom as the heat source. The water has risen along the shattered belt developing around the intrusive rocks or the Takeyama-Tsujinodake structure line, and been reserved. Around the Unagi pond, mixed sea and meteoric water has risen along the Yamakawa-Matsugakubo structure line, and been reserved. (NEDO)

  5. Report on the surveys in fiscal 1999 on the summary of new energy proliferation and promotion policies in France; 1999 nendo France ni okeru shin energy fukyu sokushin seisaku no gaiyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper reports the surveys in fiscal 1999 on the new energy promotion policies in France. The basic stance taken for the policies is the maintenance of public service in energy fields, diversification of supply systems and valuing the environment, and the responsibilities to the future generations. This course increases the relative importance of regenerative energies. Energy conservation is the most important policy problem on the medium to long term basis. The international commitment of France in dealing with global environment issues is to suppress generation of greenhouse effect gases in 2008 through 2012 to the level in 1990. The amount of gases that will be discharged as anticipated from the current status requires reduction of 16 million tons as the carbon weight. The environment tax was elaborated based on 500 francs per discharge of one ton of carbon, whose introduction has been decided to be made starting 2001. The taxation is estimated to have effect of reducing 6.7 million tons. The reduction is short by 2.27 million tons even if the effects of reduction measures in each sector and of the environment tax introduction are counted. The environment taxation may be made harsher if required, upon ascertaining the people's behavior in energy consumption. Measures to make the discharge right transaction more flexible are not taken into considerations. (NEDO)

  6. Fiscal 1999 geothermal energy development promotion survey. Report on survey of introduction of techniques for predicting impact on hot springs; 1999 nendo chinetsu kaihatsu sokushin chosa hokokusho. Onsen eikyo yosoku shuho donyu chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-08-01

    In an effort to find guidelines on how to proceed with geothermal energy development so that it may coexist with hot springs, investigations are conducted into cases of impacts on hot springs imposed by geothermal energy development activities. An impact is judged to exist when geothermal development results in a decrease or depletion of pumped or spontaneously welling hot spring water, change in the concentration of dissolved chemical ingredients, fall in water temperature, or in an increase in the amount of discharged steam. Keyword-aided retrieval of data from databases is performed, and geothermal magazines are referred to for information. There are articles reporting impacts imposed by geothermal development on hot springs in the Palinpinon area (Philippines) and 12 others and in the Corwin Springs area (U.S.) and 13 others. These articles carrying outlines and impacts of geothermal development are collected, put in order, and analyzed. Cases in which such impacts are found to exist are categorized into four groups and, in each group, episodes are differentiated from each other by the type of mechanism linking the aquifer and the reservoir which is the object of development. (NEDO)

  7. Fiscal 1999 geothermal energy development promotion survey. Survey of Akinomiya area (Long-term spurt test report - 1/2); 1999 nendo chinetsu kaihatsu sokushin chosa Akinomiya chiiki chosa hokokusho. 1/2. Choki funshutsu shiken

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-01-01

    A long-term survey was conducted on the spurting properties and fluid properties of geothermal fluids, when boreholes N9-AY-3 and N10-AY-8 were used as spurting wells and N8-AY-1, N10-AY-6, and N10-AY-7 as reinjection wells. Conducted or investigated were pH, electric conductivity, chlorine concentration determination, static temperature/pressure logging, PTS (pressure, temperature, spinner flowmeter) logging with wells spurting, buildup test, sampler logging with wells spurting, fluid property survey, tracer test, and borehole N10-AY-8 pulsation with fume spurting. It was then found that the maximum spurting capacity of borehole N9-AY-3 was 65.7t/h in steam and 90.8t/h in thermal water at a pit mouth pressure of 1.30MPaG. Some decrease was detected for approximately one month after the start of spurting, but it was concluded that there would be no further decrease thereafter. The maximum spurting capacity of borehole N10-AY-8 was 10.4t/h in steam and 8.9t/h in thermal water at a pit mouth pressure of 0.24MPaG. Some reduction was detected in the flow of steam and in fluid enthalpy after the start of spurting, and it was inferred that there would be still further reduction after continual spurting. (NEDO)

  8. Report on the surveys in fiscal 1999 on the summary of new energy proliferation and promotion policies in Canada; 1999 nendo Canada ni okeru shin energy fukyu sokushin seisaku no gaiyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper reports the surveys in fiscal 1999 on the new energy promotion policies in Canada. At the Kyoto Conference for Global Warming Prevention, Canada agreed to reduce gas discharge in 2008 through 2012 by 6% from that in 1990 as the reduction target considered realizable while maintaining the trade competitive power. The Ministry for Natural Resources encourages enhancement in energy efficiency and use of substitution energy resources, and pushes forward the promotion programs. The government imposes the world's most stringent energy efficiency criteria on electric products through the high-efficiency and substitution energy program. In the regenerative energy technologies, the government supports use of regenerative energies from the cost and environmental influence aspects. In the energy development programs, the government supports eleven ministries and agencies for energy related research and development activities. In the regenerative energy development plan, targets are set on promotion of air conditioning and hot water supply systems utilizing such regenerative energies as solar light, biomass, and underground heat. The importance is placed not only on development of new technologies, but also on marketing technologies. (NEDO)

  9. Report on the surveys in fiscal 1999 on the summary of new energy proliferation and promotion policies in Britain; 1999 nendo Eikoku ni okeru shin energy fukyu sokushin seisaku no gaiyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper reports the surveys in fiscal 1999 on the new energy promotion policies Britain. Britain has liberated completely the electric power market in June 1999 subsequently from that for the gas market. In order to share the target of reducing greenhouse effect gases during 2008 through 2012 as committed by the EU in the Kyoto Protocol, Britain has decided officially a 12.5% reduction in June 1998. The climate change tax was proposed in March 1999, and its implementation is scheduled for April 2001. This is a taxation upon commercial and industrial operators (whose carbon dioxide discharge is accounting for 40%), by which annual reduction of two million carbon tons is estimated in 2010. The government has set a target to take care of 10% of the electric power demand by regenerative energies by 2010. This policy is anticipated to be announced by the end of 2000. The EU has moved one step forward for complete opening of the electric power market in 1999, which will be followed by the gas market in August 2000. In addition, a take-off campaign was launched to promote participation and investments into the regenerative energy project. (NEDO)

  10. Fiscal 1998 geothermal energy development promotion survey. Report on data processing (No. B-6 - Tsujinodake area - Phase 2); 1998 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. 2. No.B-6 Tsujinodake chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The result of the data processing (Phase 1) and the result of the 1998 survey carried out for the Tsujinodake area, Kagoshima Prefecture, were subjected to a comprehensive analysis, and the state of existence of geothermal resources in this area was compiled into a report. In fiscal 1998, structural boring (N10-TD-1), thermal water examination, seismic exploration, environmental impact assessment, fluid inclusion examination, and rock dating were conducted. Some findings obtained from the comprehensive analysis are mentioned below. In the vicinity of structural borehole N10-TD-1, fluids move along geological boundaries and in permeable layers in the horizontal direction, with an aquiclude serving as a border. At levels deeper than 980m, there flows a mixture of seawater heated to approximately 135 degrees C by thermal conduction and water originating in Lake Ikeda. Still deeper, water from Ikeda Lake flows in and lowers the temperature. It is suggested that there may be a sharp and abrupt rise in temperature at levels deeper than the cooling region near the bottom of structural borehole N10-TD-1. It is inferred that the magma reservoir that produced the Tsujinodake lava is small as a heat source or that it has not yet formed a high temperature geothermal system shallow in the ground. (NEDO)

  11. Report on the surveys in fiscal 1999 on the summary of new energy proliferation and promotion policies in Canada; 1999 nendo Canada ni okeru shin energy fukyu sokushin seisaku no gaiyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper reports the surveys in fiscal 1999 on the new energy promotion policies in Canada. At the Kyoto Conference for Global Warming Prevention, Canada agreed to reduce gas discharge in 2008 through 2012 by 6% from that in 1990 as the reduction target considered realizable while maintaining the trade competitive power. The Ministry for Natural Resources encourages enhancement in energy efficiency and use of substitution energy resources, and pushes forward the promotion programs. The government imposes the world's most stringent energy efficiency criteria on electric products through the high-efficiency and substitution energy program. In the regenerative energy technologies, the government supports use of regenerative energies from the cost and environmental influence aspects. In the energy development programs, the government supports eleven ministries and agencies for energy related research and development activities. In the regenerative energy development plan, targets are set on promotion of air conditioning and hot water supply systems utilizing such regenerative energies as solar light, biomass, and underground heat. The importance is placed not only on development of new technologies, but also on marketing technologies. (NEDO)

  12. Fiscal 1999 geothermal development promotion survey report. Data processing (No. B-5 - Musadake region - Phase 3); 1999 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. No. B-5 Musadake chiiki (Dai 3 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-01-01

    A comprehensive analysis was conducted into the results of a survey on the state of existence of geothermal energy resources in the Musadake region, Shibetsu-gun, Hokkaido. The region was volcanically active in the period from the Neogene period into the quaternary, with some volcanos still active even today. The geological structure on the whole is characterized by the Musadake/Mt. Shitabanupuri fault which is the major structure running NNE-SSW and having a folding structure. It is inferred that Musadake is the heat source responsible for the underground temperature distribution in this region. The maximum temperature of 274 degrees C is recorded at borehole N11-MD-3 in the northeastern part of Musadake, and the temperature falls rapidly as the distance from the borehole increases. Ejection of geothermal fluids is observed at boreholes N11-MD-3 and N11-MD-4. It is inferred that the deep-seated geothermal water is of the neutral Cl type with Cl concentration estimated at approximately 12,000 mg/liter. Steam composition is characterized by a gas concentration level that is as high as 3-4 vol.%. The gas is composedly mainly of CO2 and contains some hydrocarbons. Fluids in this region are classified into water mixing into deep-seated geothermal water and groundwater originating in meteoric water. (NEDO)

  13. FY 2000 report on the survey project on the environmentally friendly energy community, excluding mostly projects on electric power generation. Survey project on the environmentally friendly energy community in the Nagoya area; 2000 nendo kankyo chowagata energy community chosa jigyo 'shutoshite hatsuden jigyo ni kakawaru mono wo nozoku' chosa hokokusho. Nagoya chiiki ni okeru kankyo chowagata energy community chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The paper studied the working-out of the basic plan on the RPF (refuse paper and plastic fuel) production business in the area mainly including Nagoya city and of the business profitability. RPF is a solid fuel made by grinding, mixing and pressurizing paper and plastics in appropriate sizes. Its shape and calorific value can be adjusted according to the needs. In the Nagoya area, the demand for RPF is more than the supply, and therefore a much larger amount of RPF is in need. In Phase 1, business was studied for paper and plastics in the container packing paper waste and business-derived general waste. As a result, the RPF production amount was 21,000 t/y, which is equivalent to the effect of reduction of the same amount of coal. As to the profitability, it was made clear that the business can be profitable if collecting 41,400 yen/ton as the re-commercialization cost. In Phase 2, the design of the facilities was made for the larger-sized commercialization by adding industrial waste plastics to the waste in Phase 1. (NEDO)

  14. Fiscal 1997 report on the development of an energy use rationalization ultra-high tech liquid crystal technology. Project of development/promotion of ultra-high tech electronic technology / technology of design/control/analysis of new functional electronic materials; 1997 nendo kenkyu seika hokokusho energy shiyo gorika chosentan ekisho gijutsu kaihatsu. Chosentan denshi gijutsu kaihatsu sokushin jigyo / shinkino denshi zairyo sekkei seigyo bunseki gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    A research was conducted with the aim of developing an ultra-low power consuming type information display which supports the next next generation informatizing society. As to the function combined type fine structure formation technology, a formation technology of fine structure supporting multi-layer pixel by organic polymer materials was established to confirm a possibility of adopting it to high functional liquid crystal display. Concerning the high functional fine structure formation technology, a study was proceeded with on holographic PDLC which is an interference reflection coloring method. In relation to the low temperature film formation technology of ferroelectric thin films, a film formation device was introduced to obtain basic data, and at the same time a possibility was studied of improving film characteristics by laser annealing conducted after the film formation. Moreover, concerning the new functional material technology, studies were made of optical interference/high light-scattering control materials, light alignment elements, ultra-high purity/ultra-reliable optical materials, ultra-anisotropy optical materials, etc. About the light reflection characteristics control technology, studied were new liquid crystal molucular orientaion control technology, multi-dimensional anisotropy structure formation technology, etc. 100 refs., 273 figs., 58 tabs.

  15. Project to support promotion of forming an environmentally friendly energy community. Survey report on 'a survey on introduction of an RDF electric power generation system utilizing general wastes in the Noto area'; Kankyo chowagata energy community keisei sokushin hojo jigyo. 'Noto chiiki ni okeru ippan haikibutsu riyo RDF hatsuden no donyu ni kansuru chosa' chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    A business feasibility survey was performed on introduction of an RDF electric power generation system utilizing general wastes in the Noto area. Wastes quantity was estimated by accounting for large-sized wastes to be generated newly as a result of enforcement of the container package recycling law, and transfer of non-combustible wastes to incineration. The quantity was estimated to be 84,000 tons annually. Quantities of RDF and heat were calculated from this estimation to be 103 tons per day and 400 lkcal/kg respectively. According to the result of discussing the RDF transportation systems, time-based freight was found advantageous for short distance, and distance freight system for long distance in terms of cost. Discussions for RDF power systems were carried out on an RDF circulation fluid bed furnace plus ash melting furnace, a fluid bed gasification melting furnace, and shaft furnace type gasification melting furnace. In a comprehensive view, it is difficult to distinguish them in terms of merit and demerit. Molten slag was assumed to be re-utilized, but cost for the re-utilization should be considered. According to the result of discussing the business feasibility, it was found difficult to make it profitable by operating the RDF power generation business alone, and wastes incineration charge should be collected. (NEDO)

  16. FY 1998 research result report. Ultra-high liquid crystal technology development for energy use rationalization (Technology of design/control/analysis of new functional electronic materials of the ultra-high electronic technology development promotion project); 1998 nendo kenkyu seika hokokusho. Energy shiyo gorika chosentan ekisho gijutsu kaihatsu (chosentan denshi gijutsu kaihatsu sokushin jigyo shinkino denshi zairyo sekkei seigyo bunseki nado gijutsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    Element technology is studied to realize a reflective-type, full-color, and high-resolution liquid crystal display for super-low power consumption data display. As to the functional compound microstructure formation technology, a 4-inch panel was trially fabricated using two-layer guest-host liquid crystal technology to achieve the desired display performance by control of molecular orientation. Further, holographic PDLC elements were favorably test-fabricated. A ferroelectric PZT thin layer was formed by forming layer at low temperature at which a glass substrate can be used. Optical interference/optical dispersion type optical control materials were studied by liquid crystal/polymer composition. Also studied were super-pure/super-reliable liquid crystal compound/liquid crystal composite systems and super-anisotropic liquid crystal compound by modeling ionic impurities and liquid crystal molecular interaction. In relation to the control technology of optical reflection characteristics, effects of liquid crystal molecular structures (derivative effect and copolymer composition) on orientation were elucidated. As to the technology to form multi-dimensional anisotropic structures, efforts were made for the heightening of formation technology of simple RGB (red, green, blue) directional reflection layers using acrylate materials. The paper also outlined the comprehensive survey. (NEDO)

  17. Fiscal 2000 research achievement report on the development of super-advanced liquid crystal technology for energy use rationalization. Development promotion project for super-advanced electronic technology - Design, control, analysis, etc., of electronic materials having novel functions; 2000 nendo energy shiyo gorika chosentan ekisho gijutsu kaihatsu seika hokokusho. Chosentan denshi gijutsu kaihatsu sokushin jigyo (shinkino denshi zairyo sekkei seigyo bunseki nado gijutsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-04-01

    Efforts are focused on the verification of target devices under the respective subjects, and activities are conducted with the development system reinforced. Three newly proposed reflection type liquid crystal devices achieve the target specifications of a reflection factor of 60% or higher and a contrast ratio of 15:1 or higher. Studies are conducted involving the five fields of (1) multilayer reflection devices, (2) memory retention liquid crystal devices, (3) single pixel color devices, (4) directional reflection devices, and (5) joint research. Research and development in field (1) covers ultra-anisotropic optical materials, ultrahigh reliability host liquid crystal materials for guest-host liquid crystals - mixed system, low voltage driven/high load holding liquid crystal compound systems, and new liquid crystal molecule orientation control technology; in field (2), low temperature fabrication of ferroelectric thin film, and ultrahigh purity high reliability liquid crystal compounds; in field (3), materials capable of controlling optical interference and higher order light scattering, photoregulation devices, highly birefringent liquid crystal materials - mixed system, and ultrahigh efficiency light scattering liquid crystal compounds; and, in field (4), multi-dimensional anisotropic structure fabrication technology and ultra-anisotropic optical materials. (NEDO)

  18. Fiscal 2000 cooperative basic project for investigation of efficiency in international energy consumption. Project for inviting researchers from developing countries (Indonesia, Philippines, Thailand and Vietnam); 2000 nendo kokusai energy shohi koritsuka chosa nado kyoryoku kiso jigyo hokokusho. Hatten tojokoku kenkyusha shohei jigyo (Indonesia, Philippines, Tai, Vietnam)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    As a part of international cooperation concerning global environmental issues, ICETT (International Center for Environmental Technology Transfer) invited administrative officers, engineers, etc., of developing countries, for the purpose of encouraging experts connected with energy conservation and environmental protection technologies, providing training on the administrative technique, antipollution technologies, energy conservation technologies, etc. The training period was from December 3 to 21, 2000, with 12 participants attended, three each from four countries, Indonesia, Philippines, Thailand and Vietnam. The contents of the technological instruction were such that cases in Japan concerning energy conservation and environmental protection were introduced generally from the administrative measures to the technological countermeasures, as were done conventionally. In the area of the environmental protection, lectures and tours on wastewater treatment were added as industrial wastewater control measures. In the subject of new energy, micro hydraulic power was added which is in progress for example in Indonesia under an aid from Japan. In the energy conservation technology, a supplementary lecture was given on the concept and methodology of an environment-protective type production technology, with emphasis placed on the energy conservation and environmental protection in manufacturing plants and production processes. (NEDO)

  19. Report on fiscal 1996 basic survey project for efficient use of energy in developing countries - database building project. Part 2. Decision on data base dissemination plan; 1996 nendo hatten tojokoku energy koritsuka kiso chosa jigyo (database kochiku jigyo) hokokusho. 2. Database no fukyu keikaku no sakutei

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    A dissemination plan was decided on concerning an energy-related database, which has been prepared in the eight countries including Japan in the Asian Pacific region since fiscal 1993. The database is so designed that the energy-related data of the eight countries are retained equally by each country and that the data of all these countries are readily made available in each of these counties in the same manner as retrieving the data of its own. It is necessary that each country establishes a system of amassing data of its own and collecting the data continuously as well as renewing the data mutually with the other countries. The disseminating/enlightening measures of the database were extracted from such viewpoints as enhancing the recognition level, educating/enlightening the usage, teaching the operation method, and customizing the NEDO-DB. In addition, a plan was prepared in which organizations/institutions, as the object of the dissemination and enlightenment in each country, were classified into four groups based on the relation to their counterpart and on the possibility of the database utilization, with a schedule made for each group as to the implementation of each of the disseminating/enlightening measures. (NEDO)

  20. FY 2000 report on the survey of the project to promote and support the formation of the environmentally friendly energy community. Study of the industrialization of the gasification power generation business by the pressurized two-stage gasification process using organic waste such as waste plastic as raw materials; 2000 nendo kankyo chowagata energy community keisei sokushin hojo jigyo chosa hokokusho. Kaatsu nidan gas ka process ni yoru hai plastic nado yuki haikibutsu wo genryo to suru gas ka hatsuden jigyo no jigyoka kento

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Viability was studied of the power generation business using plastic waste as fuel and the methanol production business. In the project, the container packing waste plastic which was sorted/collected is supplied by tender, and the organic waste such as shredder dust is mixed. And the electric power is supplied to the gasification power generation facilities by the pressurized two-stage gasification process, neighboring plants, etc. As an alternative, the methanol production was also studied. As a result of the study, if the total amount of the waste plastic needed at the supply price assumed at present can be supplied, the business can be viable economically even without subsidy, but if the supply risk in supposing tender is considered, a subsidy of approximately 10% of the equipment/plant investment is needed. As to the methanol production as an alternative, it was indicated that the economical efficiency is almost the same, but the profitability gets fast worse due to the waste plastic supply cost since there is not much income and expenses are high despite of the smaller investment size than that in the case of the power generation. (NEDO)

  1. Research report on promotion of geothermal energy exploitation for fiscal 1997. Fluid geochemical research (No.B-6 Tsujinodake district); 1997 nendo chinetsu kaihatsu sokushin chosa. Ryutai chikagaku chosa hokokusho (No.B-6 Tsujinodake chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The research covers the Tsujinodake district spreading over Yamakawa-cho and Ibusuki-shi, Kagoshima Prefecture. Hot spring water in the district is of the neutral Cl type, heated mainly by conduction and containing seawater. The thermal water layer of the highest geothermal potential exists in the vicinity of the Nishi district of Ibusuki-shi. It spreads widely in the westward part and may be linked with the Unagiike district. The temperature of the deep-seated thermal water layer is estimated at 220-230 degrees C, yet it may be higher. In addition to the layer in the vicinity of the Nishi and Unagiike districts, there is a shallow-seated hot spring aquifer in the Nagasakibana district, where the deep-seated thermal water is probably prevented from lifting in the presence of an aquiclude. In the Narikawa district, possibilities are low that the thermal water just beneath will come up. As for hot spring water in the Oyama and Okachogamizu districts, there are no signs of high-temperature thermal water infiltration. In these two districts, it appears that hot spring water is heated by conduction over a large area. For the disclosure of linkage of hot water systems and deep-seated geothermal structures which cannot be detected by geochemical investigations conducted into hot spring water, etc., it is necessary to resort to geological and geophysical researches, and to carry out test drilling. (NEDO)

  2. FY 1998 annual report on the survey on development, introduction and promotion of urban type multipurpose geothermal utilization techniques; 1998 nendo toshigata tamokuteki chinetsu riyo gijutsu no kaihatsu, donyu, sokushin ni kansuru chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Introduction of geothermal heat pump systems, which depend on temperature differential, is investigated for urban areas, which have large energy demands. Results of the surveys on the current situations of geothermal heat pump (GHP) systems indicate that they have already numbered 300,000 units in USA and totaled more than 50,000 units in Switzerland and Northern European countries, and that they are increasing at an annual rate of higher than 10%. The results also indicate that introduction of these systems are well feasible in Japan, which generally has better topographical conditions than American and European countries, and the GHP system with vertical ground heat exchanger is investigated for its topographical and environmental considerations. These systems could annually abate approximately 52 million tons of CO2 (4.3% decrease), if disseminated to all households. They are also expected to help control the heat island phenomenon, and reduce peak power consumption. The technological problems to be solved before these systems are massively disseminated including development of small scale drilling rigs and preparation of drilling manuals. System standardization and introduction of subsidy systems are also needed to massively disseminate these systems. (NEDO)

  3. FY 1990 report on the survey of geothermal development promotion. Survey of geothermal water (No.34 - Kaminoyu/Santai area); 1990 nendo chinetsu kaihatsu sokushin chosa. Nessui no chosa hokokusho (No.34 Kaminoyu Santai chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-12-01

    For the contribution to elucidation of the structure of geothermal reservoir in the Kaminoyu/Santai area in the southwest part of Hokkaido, jetting test/sampling of geothermal fluid/analysis of properties were carried out in Structural Drilling Well N2-KS-2. The induced jetting of N2-KS-2 was conducted by the air lift method in consideration of the well temperature, state of lost circulation while drilling and results of the water pouring test. As a result, the mean jetting amount of geothermal water was 202.4L/min. The total pumping amount was 559kL, which is equal to approximately 119 times as much as the volume of well. The maximum temperature was 95.9 degrees C, resulting in no steam jetting. The pH of geothermal water was 7.41-8.44, electric conductivity was 9,620-10,450 {mu}s/cm, and the Cl ion concentration was 2,204-2,545 mg/L, which are almost stable. Properties of geothermal water is classified into an alkalescent CL-SO{sub 4} type. As a result of the study, the geothermal reservoir of N2-KS-2 is basically formed by a mechanism of a mixture of the surface water and the deep geothermal water that is similar in isotope to the geothermal water of Nigorikawa production well, which indicated a tight relation in the origin with the group of Kaminoyu hot spring. (NEDO)

  4. FY 1993 report on the survey of geothermal development promotion. Survey of geothermal water (No.36 - Amemasu-dake area); 1993 nendo chinetsu kaihatsu sokushin chosa. Nessui no chosa hokokusho (No.36 Amemasu dake chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-01

    As a part of the survey of geothermal development promotion in FY 1993, survey of geothermal fluid was made using a precise structure drilling well N5-AM-5 as exploration well in the Amemasu-dake area, Hokkaido. The induced jetting of geothermal fluid was carried out by the Swabbing method in the total number of times of 185 in 11 days at 10-20 times/day, but did not result in the jetting of geothermal water. The sampling of geothermal water was conducted by guiding the geothermal water that overflowed the guide pipe to the tank. The temperature of geothermal water indicated approximately 20 degrees C in the 1st time and 40-60 degrees C in and after the 2nd time every day. The electric conductivity of geothermal water was 2.033 mS/cm, chlorine ion concentration was 420-500 ppm, and pH value was 7.17-7.72. As a result of the survey, it was presumed that the geothermal water of this well originated in the meteoric water around the area and formed slightly supported by emitted volcanic matters. As to the geochemical temperature, the silica temperature indicated about 120 degrees C and the alkali ratio temperature did about 180 degrees C. It was considered that there possibly existed geothermal reservoirs of approximately 180 degrees C in alkali ratio temperature around the well. (NEDO)

  5. FY 1996 Report on the data processing for the geothermal development promotion investigation. No.B-3 Kumaishi Area (Phase 2); 1996 nendo chinetsu kaihatsu sokushin data shori hokokusho. 2 . No.B-3 Kumaishi chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    Described herein are the FY 1996 results of the No.B-3 Kumaishi Area investigation, conducted as part of the geothermal development promotion investigation project. The ground investigation project covers geological and altered band, geochemical, gravitational and electromagnetic investigations. The drilling investigation project covers the test drilling for the structural investigation, temperature logging, water injection and temperature recovery tests at the N7-KI-1, N7-KI-2, N8-KI-3 and N8-KI-4; core cutting investigation; hot water investigation at the N8-KI-1 and N8-KI-2; and environmental impact investigation. The following conclusions are derived from the findings. The geothermal hot water in the test area came from seawater (fossil seawater) locally captured by the highly water-permeable strata (e.g., interfaces in the strata, and fractured strata) and underground water from rain water, heated by the conducted heat to around 200 degrees C at the highest. It is estimated that the center of the conducted heat is located in the eastern part of the Yagumo Area. The geothermal hot water was not heated to an extent to form the widely distributed convection systems, but arise in the form of separate, small-scale systems. (NEDO)

  6. Fiscal 1999 geothermal development promotion survey. Development potentiality survey - Strategic survey/nation-wide survey (Report on Hokkaido region); 1999 nendo chinetsu kaihatsu sokushin chosa. Kaihatsu kanosei chosa - senryakuteki chosa zenkoku chosa (Hokkaido chiiki hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-08-01

    For the effective implementation of the survey, an analysis was conducted into areas expected to be successfully developed for geothermal energy, and promising areas and prioritized survey areas were selected. Data then in existence were collected at the Doto district 1, Doto district 2, Toyoha-Niseko district, and the Iburi district and subjected to reanalysis, and a wide area geothermal system conceptual model was built. Using the model, development-promising areas were extracted, the amount of resources was assessed, and an optimum survey program was prepared. One promising area was selected in the Doto district 1, four in the Doto district 2, two in the Toyoha-Niseko district, and one in the Iburi district. As prioritized survey areas, Musadake was selected in the Doto district 1; Yoichidake, Yunosawa, and Takinosawa in the Toyoha-Niseko district; and Raibadake in the Iburi district. A Monte Carlo analysis was conducted, and the result indicated that Musakake had 93-121MWe in resources of which 55MWe would be exploitable with a probability of not less than 90%. (NEDO)

  7. Fiscal 1998 research report on promotion of geothermal development. Environment impact research report (No. A-4 Kunbetsu-Dake area); 1998 nendo chinetsu kaihatsu sokushin chosa. Kankyo eikyo chosa hokokusho (No.A-4 Kunbetsu chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    For extracting the areas to be conserved from the viewpoint of environment for the research on geothermal well drilling, the environment impact research was made on the protection and regulation states of animals and plants in Kunbetsu-Dake area. 46 species in 12 families of mammals were confirmed in/around the area by document survey, and among them 19 species in 10 families of mammals were important academically. 340 species in 55 families of birds were confirmed, and among them 79 species in 29 families of birds were important academically. 3 species in 3 families of amphibians, and 6 species in 4 families of reptiles were confirmed, and among them 1 species of amphibian was important. 873 species in 135 families of land insects were confirmed, and among them 20 species in 11 families were important. 1055 species in 115 families of plants were confirmed, and among them 126 species in 46 families were important. Most of vegetation was 9 or more in degree of naturalness. The peripheral area of Kaibetsu-Dake is the plant colony area specified by the 2nd basic survey on natural environmental conservation (Environment Agency). (NEDO)

  8. Report on the survey on the project for working out the new energy vision of Oyamada Village; 2001 nendo Oyamada mura chiiki shin energy vision sakutei tou jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    For the purpose of promoting the introduction of new energy and enhancing the awareness of it in Oyamada Village, Mie Prefecture, an investigational study was conducted of the energy demand amount, existence amount of new energy and project for new energy introduction, and a vision was worked out. The energy demand amount of the village was 672,289 x 10{sup 3} MJ/y. The rate of energy source was about 27% of electric power and 65% of petroleum-base such as gasoline, light oil and kerosene. The amount of CO2 emitted from these was estimated at 50,333 t-CO2. As viewed by sector, the energy demand amount consisted of 46.7% in the transportation sector, 36.3% in the industrial sector, 9.6% in the residential sector and 7.3% in the business sector. As the project for new energy introduction, the following were studied: Aoyama Heights wind farm (wind power generation: 700kW x 12 turbines); wind power generation project jointly with citizen; introduction of photovoltaic power generation/solar heat utilization to public facilities; greenhouse of Western orchard using waste heat from hot spring, stockbreeding waste utilization project, recycle project for thinnings, introduction of clean energy vehicle, etc. (NEDO)

  9. Research report of fiscal 1997. Joint research project on petroleum substituting energy between Japan and the EU; 1997 nendo chosa hokokusho. Nichi EU sekiyu daitai energy kanren kyodo kenkyu jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Four researchers were invited from EU countries to promote R & D of petroleum substituting energy in Japan, and the joint research was made in institutes of Agency of Industrial Science and Technology related to each theme for 50 days. On the research on deep geothermal prospecting based on volcanic halocarbon group, it was showed that halocarbon discharged from volcanic or hydrothermal system is an important window to survey activities within the earth. On the research on catalyst for hydrogenation of coal-derived liquid, XPS data was reported, and some preliminary conclusions were obtained. On the research on oxide system anode material for Li secondary cells, a method for improving the state of host to ion moving in 1-D to 3-D networks by diffraction method was showed. In particular, the method was effective to offer electronically sensitive environment to moving ion system. On the research on hydro-dechlorination of hydrocarbon halide, the theme related to environmental measures against waste hydrocarbon halide (depletion of the ozone layer) was studied. 83 refs., 32 figs., 20 tabs.

  10. Report of a photovoltaic power generation field test at Deigo-en, an old people`s home, in Ginoza village, Okinawa prefecture; Deigoen taiyoko hatsuden field test jigyo (Okinawaken Ginozamura) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-26

    A photovoltaic power generation system was installed on the roof of Deigo-en, a special nursing home for the aged, to collect various operation data through a long-term operation. This photovoltaic power generation system has an output of 99 kW, batteries, and functions of inverse power flow and self-operation. The solar cell module is the polycrystal system, its conversion efficiency is 12.6%, and the maximum output is 108.2 W. The array configuration is composed of 2 sets of 9 series and 51 parallels, and totally 918 modules are used. This system supplies the power for lighting and air conditioning, which are indispensable for living of 105 old-age dwellers in the home, as well as for refrigerator for storing foods, and medical equipment for maintaining their health. At the outage caused by typhoon, other disasters, or emergency, crisis management is conducted using the batteries and self-operation function, which enables to supply energy with a function of an evacuation place. Arrangement and analysis of the long-term operation data and trouble examples are to be carried out. 13 figs.

  11. Survey for working out a new energy vision of the Tateshina Town area; 2001 nendo Tateshina machi shin energy vision sakutei chosa hokokusho. Chiiki shin energy vision sakutei tou jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For the purpose of promoting the introduction of new energy and heightening the awareness of new energy in Tateshina Town, Kita-saku County, Nagano Prefecture, study was made of the existence amount of new energy, energy consumption amount in the town, project for the concrete introduction, etc., and a 'new energy vision of the area' was worked out. According to the sample survey, in the energy supply/demand structure of Tateshina Town, electricity was 32.2%, kerosene 23.9%, gasoline 17.1%, light oil 11.2%, heavy oil 10.3%, etc. By sector, the commercial/residential sector was 57.1%, transportation sector 25.9% and industrial sector 17.0%. The demand in FY 2010 is expected to increase by 8.9%-22.0% in FY 2010. For the project on new energy introduction, the following were studied: supply of new energy information, support of the introduction to town people, energy utilization of forest resource, preparation of an eco-museum in the Shin-jin'nai forest park, promotion of the tourism using new energy, study of energy utilization of stockbreeding waste, introduction to administrative facilities, etc. (NEDO)

  12. Fiscal 1997 report on the survey project on planning to execute `The New Earth 21`; 1997 nendo chosa hokokusho (`chikyu saisei keikaku` no jisshi keikaku sakusei ni kansuru chosa jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Japan proposed in the Houston Summit the New Earth 21 to be carried out with technology development and technology transfer, and to make a concrete development of the project, Japan also proposed in the Tokyo Summit a TREE Plan for working out comprehensive strategies of the innovative technology development. In the CO3 Kyoto Conference in 1997, numerical targets for developed countries were determined which have legal binding force for control/reduction of greenhouse gas emissions in the term of 2008-2012. It was agreed to urge developing countries also to play a certain part in the project through the clean development. Therefore, the paper made quantitative analysis of important CO2 prevention technologies, technology transfer costs, and economical assessment by energy conservation. As a model, the DNE 21 model was upgraded and used into which CO2 prevention technologies, energy, economy and climate changes were integrated. In fiscal 1997, the following were carried out: collection of data on important CO2 prevention technologies and systems and analytical assessment using the DNE 21 model, CO2 reduction and selection of energy technology, assessment of energy system costs, construction of the unified DNE 21 model, and opening of the international workshop. 62 refs., 98 figs., 34 tabs.

  13. Report on field test project for wind power development at Onejime Athletic Park. Detailed wind characteristics survey; Onejime Undo Koen ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A detailed wind characteristics survey was conducted to study the feasibility of a wind power generation system for Onejime Athletic Park, Kimotsugu-gun, Kagoshima Prefecture. Observation instruments were installed at a wasteland beside the park and, in the period October 1, 1998, through September 30, 1999, data were collected at a point 20m above ground, such as the average wind speed and direction, wind velocity standard deviation, and the maximum instantaneous wind velocity. The data were analyzed, and findings were obtained, as mentioned below. The wind axis along which the wind direction occurrence rate was the highest ran WNW-ESE at an occurrence rate of 65.8%. Turbulence intensity was 0.23 at wind speeds of 2m/s and more, the maximum instantaneous wind velocity was 40m/s, all these fully satisfying the evaluation levels set forth by NEDO (New Energy and Industrial Technology Development Organization). On the other hand, the average wind speed was 3.48m/s and wind energy density was 69W/m{sup 2}, these failing to satisfy the levels indicated by NEDO. Studies were made on the assumption that 150, 300, and 750kW-class wind turbines would be introduced, and then it was found that their annual operating factors and facility availability rates both failed to meet the NEDO standards concerned and that therefore the site in question was not fit for wind power generation. (NEDO)

  14. Fiscal 2000 business report. Technology transfer project involving environmentally-friendly coal utilization (CCT downstream sector); 2000 nendo hokokusho. Kankyochowagata sekitan riyo gijutsu iten jigyo (CCT karyu bun'ya) - 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the clean coal technology (CCT) to be introduced into and popularized in countries in Asia and the Pacific region, Japan invited engineers from these countries and provided them with CCT-oriented education and training. The participants were backbone leaders engaged in the research and development of coal combustion technologies and facilities, in the delivery of technical guidance and education, or in the implementation of environment-related measures back in their enterprises, plants, research institutes, and the like, and they acquired leading-edge technologies, knowledge, and techniques in the field of CCT. The environment course was held in the period of October 14-29, 2000, and the combustion course in the period of November 18-December 17, 2000, and the participants totalling 38 were from China, Indonesia, Thailand, the Philippines, or Vietnam. In this fiscal year, a follow-up survey was conducted in addition to the CCT education and training, which aimed to learn the CCT popularization status in the respective countries involved. It was then found that many of the trainees assumed important positions related to CCT popularization in their countries and were dealing with CCT popularization and implementation. (NEDO)

  15. Fiscal 1996 international research cooperation project. Report on the result of the development survey of tribo materials; 1996 nendo kokusai kenkyu kyoryoku jigyo. Tribo material no kaihatsu chosa seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    Basic information was collected and assessed on materials and element technology for tribo materials which are expected to contribute to improvement of energy efficiency of machine/equipment having the sliding part such as automobiles. A survey was conducted of creation of substrate materials, the surface treatment method, and evaluation of coating characteristics. For an analysis of high polymer abrasion powder, the micro ATR method is effective. As an analysis method of abrasion scar, the micro ATR method is effective to specify the peeling part of coating, and the Raman method is effective for an analysis of transfer matters or abrasion powder. As a method to collect various shapes of abrasion powder, processing of material surfaces by polishing method is effective. As a dynamic analysis method, the infrared ray stress image method is effective. As an evaluation method of deficient concentration of coating, the GC-MS method is effective. For the application of high-hardness/low-toughness gas phase coating film to the sliding part, important factors are the substrate hardness, surface roughness, and film adhesiveness from the aspect of materials and the determination of pressure of the sliding face from the aspect of sliding conditions. 12 refs., 38 figs., 20 tabs.

  16. Management efficiency improvement promotion of SS; SS no unei koritsuka sokushin

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-01

    Full amount fund petroleum product marketer and Sumisyo petroleum of Sumitomo accelerate management efficiency improvement of service station (SS). National about 300 places have been developed in within the year Within SS, it aims at break-even point achievement of gasoline, coarse advantage 10 yen per light oil of 1 liter in 84 all tied SS stores. SS which has realized the system of 10 yen in the current is whole about 50%. But, by doing personnel configurations and operational procedures, that they reexamine the balance management, etc. in half remaining SS 12 yen-13 yen; the efficiency improvement is done thoroughly. (translated by NEDO)

  17. Fiscal 1999 survey report. Basic survey project on international cooperation for energy consumption efficiency improvement (Project on cooperation for oil consumption efficiency improvement - Fiscal 1999 survey report on Indonesia); Kokusai energy shohi koritsuka nado kyoryoku kiso chosa jigyo / sekiyu shohi koritsuka kyoryoku chosa jigyo. 1999 nendo Indonesia chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The project aims to contribute to the promotion of international research cooperation ranging from the survey stage through the stages of verification study and popularization, and, for this purpose, it conducts on-site investigations for exploring needs for environmentally-friendly energy-saving technologies in developing countries where there will be massive-scale oil consumption in the future. In this report, surveys and deliberations are conducted to embody proposed measures, and findings are compiled, based on the surveys conducted in the preceding financial year relating to energy efficiency in and environmental technologies for the textile and chemical industries. Much is expected from the proposed measures as promising subjects of joint verification researches. A technology is proposed for energy saving in the textile industry of Indonesia. The technology aims to wash cloth using high-pressure water from a special nozzle, to continuously measure the level of contamination of the waste water, and to feed back the measured values to the water supply side for the automatic optimization of the amount of the washing water and for the utilization of warm waste water for the ultimate purpose of cascade-aided energy saving. As for the proposition for recovering chemicals mainly caustic soda, it achieves environmental improvement and energy saving in the chemical industry simultaneously. (NEDO)

  18. Research report of FY 1997 on the environmentally acceptable coal utilization system introduction support project. Demonstration project of circulating fluidized bed boiler (Jinzhou Coal-Thermal Power Corporation); 1997 nendo seika hokokusho (kankyo chowagata sekitan riyo system donyu shien jigyo). Junkan ryudosho boiler ni kakawaru jissho jigyo (Jinzhou netsuden sokoji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    To verify the clean coal technology to be diffused in China and consolidate its diffusion basis, demonstration project of circulating fluidized bed boiler was conducted through the cooperation with China which is positive in its introduction. This report describes its characteristics. Coal and limestone are supplied in a lower part of combustion chamber, and are mixed with circulating ash by fluidized air for combustion. Densely fluidized bed the same as the bubbling fluidized bed is formed in the lower part of combustion chamber, which provides excellent stability in ignition and combustion. Particles including ash, char and limestone formed during the combustion are discharged into the cyclone through the convection heat transfer part at the outlet of combustion chamber with the combustion gas flow. Since the gas temperature is lowered to 400 to 500degC at the convection heat transfer part, troubles of the ash circulating system can be prevented. The combustion gas separated from ash at the cyclone is discharged through the heat exchanger and precipitator, and the collected ash is returned to the lower part of combustion chamber. In FY 1997, design, fabrication, procurement/inspection, field survey/meeting, survey of visitors/meeting, and education were carried out. 4 figs., 4 tabs.

  19. Report on the fiscal 1997 result of the Japan-China joint demonstration project of environment-friendly cost utilization systems. Low grade coal combustion system (Zhejiang Huba Co. Ltd.); 1997 nendo seika hokokusho kankyo chowagata sekitan riyo system kyodo jissho jigyo. Teihin`itan nensho system ni kakawaru jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This demonstration project aims at reduction of pollutants derived from coal utilization in China by demonstration of CCT to be diffused in China and preparation of diffusion bases, and stable import of energy for Japan. A low-grade coal combustion system burns low-grade coal by use of an internal circulating fluidized bed boiler which burns coal by uniform mixing and circulation of coal and some particles such as limestone and ash. Main specifications of the boiler are as follows: evaporation rate of 35t/h, steam pressure of 3.82MPa (39.0kg/cm{sup 2}), steam temperature of 450degC, water supply temperature of 150degC, internal circulating fluidized bed combustion type, boiler efficiency of 75%, and desulfurization rate of 90% or more. Main properties of low-grade coal are as follows: calorific value of 1830kcal/kg, coal size of 10mm or less, total water content of 2.5%, total S content of 2.7%, ash content of 67.7%, limestone purity of 50% or more, and stone size of 3mm or less. The results in fiscal 1997 are as follows: field survey and arrangement, basic planning and design, design, production and procurement of equipment, training, and dispatch of field supervisor. 26 figs., 3 tabs.

  20. 17th Symposium of NEDO projects. Introducing/spreading project subcommittee; Donyu fukyu jigyo bunkakai. Dai 17kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The results of the following themes are presented in this subcommittee; (1) outline of the new energy introduction promotion department, (2) the project results, and (3) introduction of the examples. For the theme (1), NEDO is supporting the projects for introducing and promoting new energy systems, feasibility studies for introduction of these systems, and field test (FT) projects to accumulate the experiences, e.g., collecting the data by operating these systems under actual loads, development and technology demonstration projects for introduction of new energy systems, and advisory projects for supporting introduction of new energy systems. For the theme (2), those results reported include the results and examples of the FT projects for power generation by photovoltaic cells and wind power generation, results of the FT project for power generation by fuel cells and creation of the FT projects for pioneer high-efficiency energy systems, current status of the environment-friendly energy community projects (heat supply systems), results and examples of the environment- friendly energy community projects (power generation projects), demonstration tests for establishing the distributed power supply systems of the next generation, tests for establishing techniques for, e.g., load-leveling in power generation by photovoltaic cells for residential purposes, results of the project for technology of utilizing unutilized energy, survey on the techniques for power generation by wastes, and advisory projects for supporting introduction of new energy. (NEDO)

  1. NEDO Forum 2000. New energy and energy conservation introducing and proliferating project session (toward promotion of introducing new energies and energy conservation); Shin'ene shoene donyu fukyu jigyo session. Shin'ene shoene no donyu sokushin ni mukete

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    The following themes were presented at this session: (1) the history and roles of the NEDO's introduction and promotion projects, (2) expectation and prospects to introduction and promotion of new energy and energy conservation technologies, (3) energy innovation in houses and buildings actively using new energies and energy conservation means, (4) works on introducing new energies by using the private finance initiative (PFI), and (5) the last resort for energy conservation promoting measures in the industrial domain (high-performance industrial furnace technologies). In Item 3, design cases intended for sustainable buildings were introduced. In Item 4, the PFI is explained as a means to use as much fund and management know-how in private sectors as possible in improving the social capitals and providing high-quality public services. In Japan, the PFI promotion law was established in July 1999 (the law concerning promotion of improvements in public facilities by utilizing funds in private sectors). Introductions are given on the wide area wastes disposal project in Kimitsu Area, the PFI model project for power generation of everyday use at Kanamachi Water Purification Plant of the Tokyo Metropolitan Water Supply Bureau, and the Omuta RDF power generation project. In Item 5, descriptions are given on a new high-performance industrial furnace using the combustion mechanism of 'high-temperature air combustion' created from preheated air at temperatures higher than spontaneous combustion temperature. (NEDO)

  2. Survey for development feasibility in fiscal 1999 investigation of geothermal development and promotion. Evaluation report on practicability technology survey SWD method (Evaluation report concerning verification test); 1999 nendo chinetsu kaihatsu sokushin chosa no uchi kaihatsu kanosei chosa. Jitsuyoka gijutsu chosa SWD ho hyoka hokokusho (jissho shiken ni kakawaru hyoka hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-05-01

    An evaluation test was conducted on SWD (Seismic While Drilling) method as a part of the investigation of geothermal development and promotion. The test was implemented at the time of drilling of N11-MD-3 well in the northeast base area of Busadake, Hokkaido. The test items were such as verification of direct waves propagating from a bit to the surface, identification of signals passing through a fault zone using direct waves and reflected waves, estimation of distance between a fault and a bent zone, and grasping the direction of signal propagation at the time of inclined drilling. As a result of the experiments and studies, following conclusions were obtained. Reflected waves extracted are not necessarily limited to those from a reflection area from which the shape of a fault can be grasped; unless there is a clear reflection area that can be picked up on the surface near a fault, the application of this method is not effective. In an analysis using direct waves, it was possible to obtain an inclined angle of a fault plane from the estimation of velocity structure, propagation route, and assumption of the shape of the fault plane and, therefore, to grasp the shape of the fault. Obtaining reference data is essential for identifying bit signals. (NEDO)

  3. Report on fiscal 2000 geothermal development promotion survey. No. C-5 Appi district environmental impact survey (1st phase); 2000 nendo chinetsu kaihatsu sokushin chosa hokokusho - No.C-5. 1. Appi chiiki kankyo eikyo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-08-01

    For the survey of weather in the Appi district, Iwate Prefecture, observation data covering the last decade were collected at weather stations and the like, and characteristics of weather, climate, and natural earthquakes were learned. In the survey of fluctuation in the spa water level, studies were made about fluctuation in water temperature, spring water, and river water, and basic data were collected for the examination of the impact to be generated by geothermal exploration well boring and short-term discharge tests. In the survey of animal and vegetables, the habitation and distribution of animals and vegetables at sites planned for geothermal well boring were investigated, and data were collected for the evaluation of the impact to be imposed on them by well boring or the like. In the survey dealing with nature conservation and landscape, laws and regulations governing nature conservation were collected and put in an easy-to-use order, and seasonal changes in the natural landscape were photographed and recorded. In the survey of noise/vibration and ground fluctuation, the background values were measured prior to the implementation of geothermal well boring, discharge tests, and so forth. (NEDO)

  4. FY 1998 geothermal development promotion survey. Report on the environmental effect survey (animals/plants, No. B-7 Kuwanosawa area); 1998 nendo chinetsu kaihatsu sokushin chosa. Kankyo eikyo chosa hokokusho (doshokubutsu, No.B-7 Kuwanosawa chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This survey was conducted to estimate effects of drilling of geothermal exploration well on the environment, aiming at grasping the present state of environmental elements before the survey/development. As a result of the literature survey, the following distribution were confirmed in the fauna: 5 orders 10 families 19 species in the mammalia, 10 orders 25 families 73 species in the aves, 1 order 3 families 6 species in the reptilia, 2 orders 6 families 9 species in the amphibia, and 17 orders 179 families 719 species in the insecta. In the flora, a distribution of 132 families 670 species was confirmed. The results of studying the above indicated that in the fauna, there were 10 species such as antelope as valuable animal in the area surveyed and that it is necessary to pay much attention to the environmental preservation of the habitat for those animals in the well drilling associated with geothermal survey. In the flora, the 13 valuable animals selected as animal having a fear of extinction in the 'plant-version red list' were confirmed in the area surveyed and the periphery. Further, as to the plant colony, there are no important colonies in terms of preservation. In well drilling, important things are efforts exerted to restore to the original state of the area altered, prevention of the washed-away of mud water, etc., and efforts exerted to preserve the environment of vegetation. (NEDO)

  5. Investigation of geothermal development and promotion for fiscal 1997. Investigation report on geological/alteration zone (No. B-5 Musadake area); 1997 nendo chinetsu kaihatsu sokushin chosa. Chishitsu henshitsutai chosa hokokusho (No.B-5 Musadake chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This investigation was intended to clarify the possibility of existence of geothermal reservoir layer by elucidating the underground structure and thermal source forming the geothermal system around Musadake, in the area extending over Nakashibetu-cho and Shibetu-cho, Shibetu district, Hokkaido, and further by grasping the distribution and properties of the geothermal alteration zone. The geothermal system of the subject area seems to be governed by Musadake - Mt. Shitabanupuri fault, its incidental bent zone, and the graben extending to the southeast side. The thermal source is presumably a magma reservoir that evolved Musa volcano. The depth hot water is presumed to exist in the underground depth around Mt. Imora; and it seems that the thermal conduction and volcanic ejecta are caused by a chain of volcano-related magma reservoirs around Musadake, the thermal source presumably. The depth hot water is estimated to be not less than 250 degrees C and a high Cl concentration. Within the graben, mudstones are distributed such as Kawakita layer and Yokoushigawa geological layer. Moreover, it is possible that an impermeable layer due to alteration is spread. (NEDO)

  6. FY 1995 Report on the data processing for the geothermal development promotion investigation. No.B-3 Kumaishi Area (Phase 1); 1995 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. 1. No.B-3 Kumaishi chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    Described herein are the FY 1995 results of the No.B-3 Kumaishi Area investigation, conducted as part of the geothermal development promotion investigation project. The project covers the geological structure, geochemical, gravitational, electromagnetic, environmental impact and supplementary investigations. The following findings are obtained by the comprehensive analysis of the data. The Kumaishi Area is based on the sedimentary rocks and granite formed in the Pre-Ternary, which are unconformably covered by the strata belonging to Upper Oligocene of Ternary to Lower Pleistocene of Quaternary. The presence of NW-SE to E-W to NE-SW systems is suggested as the main fracture systems. It is estimated by the K-Ar method that the intrusion was formed in the 2.06 to 2.28Ma. The geochemical temperature suggests the presence of the fluid of 200 degrees C or higher as the deep hot water temperature. The resistivity structure generally indicates the NW-SE direction. Each stratum is confirmed by the test drilling for the structural investigation. The fluid motion model suggests possibility of hot water of high salt content, similar to that confirmed deep in the Yagumo Area, distributed deep in the Kumaishi Area. (NEDO)

  7. FY 2000 report on the geothermal development promotion survey - No.C-4 Shiro-mizukoshi area. Resource survey (Primary); 2000 nendo chinetsu kaihatsu sokushin chosa. No. C-4 Shiromizukoshi chiiki shigen chosa hokokusho (Dai 1 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-01-01

    As a part of the FY 2000 geothermal development promotion survey, survey was conducted in the Shiro-mizukoshi area (about 10km{sup 2}), Kagoshima prefecture, the gradually-inclined area located at the southwest foot of Volcano Kirishima, and the results were summed up. In the survey, the following were carried out: surface survey such as geology/alteration zone/fracture system, high-density gravity exploration, electromagnetic exploration, geochemical fluid survey, core test by drilling three exploration boreholes, temperature log, temperature recovery test, water injection test, short-term jetting test, etc. N12-SZ-1 came across the reservoir associated with the ENE-WSW system fault at a depth of 1,085m. The result of the temperature log and the geochemical temperature indicated that the temperature of the reservoir was between 230 and 240 degrees C. However, the reservoir was regarded as the vapor heating reservoir heated by the high-temperature vapor which is thought to be the shallow ground water separated from the deep reservoir. N12-SZ-2 was a large lost circulation zone at a depth between 1,325 and 1,486m, which indicated that N12-SZ-2 came across the ENE-WSW system Shiro-mizukoshi fault. N12-SZ-3 seems to be the area into which ground water flows. (NEDO)

  8. FY 1997 Report on the data processing for the geothermal development promotion investigation. No.B-3 Kumaishi Area (Phase 3); 1997 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. 3. No.B-3 Kumaishi chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-01-01

    Described herein are the results of the comprehensive analysis of the No.B-3 Kumaishi Area, investigated in the FY 1995 to 1997 period as part of the geothermal development promotion investigation project. The ground investigation project covers geological and altered band, geochemical, gravitational and electromagnetic investigations. The drilling investigation project covers the test drilling for the structural investigation, temperature logging, water injection and temperature recovery tests at the N7-KI-1, N7-KI-2, N8-KI-3, N8-KI-4 and N9-KI-5; core cutting investigation; hot water investigation at the 4 wells; environmental impact investigation; and supplementary investigations for determination of ages of rocks and alteration, and analysis of the substances contained in the fluid. The following conclusions are derived from the findings by the comprehensive analysis. The geothermal hot water in the test area came from seawater (fossil seawater) locally captured by the highly water-permeable strata (e.g., interfaces in the strata, and fractured strata) and underground water from rain water, heated by the conducted heat to around 200 degrees C at the highest. It is estimated that the center of the conducted heat is located in the eastern part of the Yagumo Area. (NEDO)

  9. Research cooperation project on the development of easy injection molding control technology for engineering plastics; Engineering plastic no seikei joken kan`i settei gijutsu ni kansuru kenkyu kyoryoku jigyo seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    In order to enhance the industries which supply assembly parts to Japan`s assembly industries in Thailand, research cooperation project on the plastic parts production technology has started. For the research cooperation, the mold design is effectively conducted using simulation technique of CAE (computer aided engineering), and an international easy injection molding control system is made using the molding support software for injection molding machines. In FY 1996, actual situations of plastic parts and assembly industries in Thailand have been investigated through the cooperation with the counterpart of Thailand. Demand and supply of engineering plastics, receive and inspection of parts, and current circumstances of molding processing makers in Thailand have been grasped. Based on the results of this investigation, proposal of basic plan, time schedule, and delivery plan of molding machines and testing equipment have been discussed, to make the basic plan. 18 refs., 4 figs., 23 tabs.

  10. Research report of fiscal 1997. Invitation project of specialists on petroleum substituting energy between Japan and the EU; 1997 nendo chosa hokokusho. Nichi EU sekiyu daitai energy kanren senmonka shohei jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Specialists were invited from EU countries for information exchange to promote R and D of petroleum substituting energy in Japan. In the seminar on the present and future trend of R and D of fuel cells in EU countries, the present R and D state of fuel cells in Italy, the present state and future R and D plan of fuel cells in ANSALDO group, the state of SOFC R and D in Germany and by international cooperation, and R and D of polymer electrolyte fuel cell in Fraunhofer institute for Solar Energy Systems were reported contributing to mutual understanding between Japan and the EU. Exchange of opinions and information was also made between 4 fuel cell specialists of EU countries and Japanese specialists. The report on such an exchange includes the outline of Japanese fuel cell technologies, and the present R and D states of phosphoric acid fuel cell (PAFC), molten carbonate fuel cell (MCFC), solid oxide fuel cell (SOFC), and polymer electrolyte fuel cell (PEFC). The specialists visited some government organizations, semi-government organizations, institutes and private enterprises related to promotion, support and verification of R and D of fuel cells. 2 tabs.

  11. International research cooperation in fiscal 1997. Report on the research, development, and evaluation of environmentally-friendly combustion technologies; Kokusai kyoryoku jigyo. Kankyo chowagata nensho gijutsu ni kansuru kenkyu kaihatsu hyoka hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Concerning the research and development of environmentally-friendly combustion technologies that had been conducted for six years beginning in 1992, analysis and discussion were made by a special committee dedicated to the evaluation of the efforts, and the outcome is stated. In the study of zeolite-base catalysts, a highly active catalyst was developed which assumes a multilayer structure of mordenite, etc., with titanium introduced thereinto using an NO-selective reducing catalyst. As for metal complex oxide-base catalysts, various catalysts high in activity were developed, based on saponite which is a laminar, clayey compound. As for alumina-base catalysts, details were learned of the reaction mechanism and catalysis activation sites and, helped by the findings, a silver-supporting alumina catalyst was produced. In the study of direct decomposition type NOx removing catalysts, a success was achieved in causing NO to be decomposed with high selectivity in an oxygen atmosphere by use of new-type electrodes, functional layers, and solid electrolytes. In the field of catalytic combustion, a PdO-Pt/Ba-Al2O3 catalyst was developed, which is to serve for a hybrid type catalytic combustion method. 19 refs., 112 figs., 25 tabs.

  12. Joint research achievement report on field test project for photovoltaic power generation of industrial use in fiscal 2000; 1999 nendo sangyo tou you taiyokohatsuden field test jigyo kyodo kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-05-01

    This paper summarizes the achievements in fiscal 2000 on the field tests for photovoltaic power generation of industrial use. This report describes the details of the achievements of the field tests in 36 locations including the following organizations: the Japan Industrial University, a school juristic person; the Harukawa Gakusha, a school juristic person; the Snow Brand Dairy; the Sony Chemicals; the West Japan Passenger Railways; the Hokushin Welfare Society, a social welfare juristic person; the Seikyou Gakuen, a school juristic person; the Miko Corporation; the Akashi Apparel Corporation; Shigenobu Township in Ehime Prefecture; the Japan Ham; the Seiko Epson; Henri Charpantier Corporation; the Joyo Gakuen, a school juristic person; Matsushita Electric Industry; Nio Township in Kagawa Prefecture; Matsumae Township in Ehime Prefecture; Nakajima Township in Ehime Prefecture; Sugo Gakuen, a school juristic person; the East Japan East Japan Passenger Railways (General Training Center); Shizuoka Automobile Gakuen, a school juristic person; Tomiyama Village in Aichi Prefecture; Futamura Grinding Industry; Toba City in Mie Prefecture; Higashi-ura Township in Hyogo Prefecture, Taisho Township in Kochi Prefecture; the Nagasaki Branch Office of the West Japan Telegraph and Telephone Company; Ashikita Township in Kumamoto Prefecture; the Miyazaki Branch Office of the West Japan Telegraph and Telephone Company; Oi Township in Fukui Prefecture; the Keishin Society, a social welfare juristic person; the Azabu Veterinarian School, a school juristic person, Omiya Township in Ibaraki Prefecture; and the Showa Electric Machinery. (NEDO)

  13. Report on the project for working out the new energy vision of the Kamoto Town area. Feasibility study; 2001 nendo Kamoto machi chiiki shin energy vision sakutei tou jigyo fijibiriti hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For the realization of 'the introduction of biomass of animal manure/garbage,' an important item in 'the new energy vision of the Kamoto Town area (Kumamoto Prefecture),' a feasibility study was conducted. For the resource retrieval of animal manure, etc., only composting is generally conducted. In this project, however, two projects are combinedly conducted: project for producing biogas (main component: methane gas) and liquid fertilizer and project for producing compost. The project pursues the reduction in running cost by self-sufficiency of energy and the environmental preservation by recovery of methane gas. The plant for producing biogas and liquid fertilizer consists of garbage crusher, storage tank, anaerobic fermentation tank and generator. The plant for producing compost consists of solid liquid separator, fermentation tank, agitator and smell remover. In the feasibility study, the following were carried out: study of the establishment of specifications/selection of the necessary conditions for a plant tentatively named the Kamoto Town Biomass Center, study of the proposed site for plant, survey of the financial plan, survey of the operational system, study of the project promotion system, etc. (NEDO)

  14. FY 2000 report on the project for promotion of clean coal technology. Survey of zero emission coal technology; 2000 nendo clean coru technology suishin jigyo. Zero emission coru technology chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The paper surveyed a plan on the zero emission coal technology including up to CO2 fixation which is proposed in the U.S. and the present situation of the related study, and studied the viability of this plan including the R and D similar to this plan in Japan. Los Alamos National Laboratory in the U.S. thought of a concept of the technology to produce hydrogen from coal and recover CO2 at the same time for underground fixation, and is proceeding with the practical application. The process does not need oxygen, combustion, nor heating to be newly made. What is needed except coal is only water and lime, both of which can be recycled. The process, which discharges nothing into the air, is a closed cycle. The HyPr-RING process in Japan is a technology to decompose coal in high temperature (about 650 degrees C)/high pressure (100-200 atm) water for hydrogen formation, absorbing the formed CO2 by CaO, etc. Both of the processes have the problem, but it is necessary to make information exchanges since Japan and the U.S. devised the process at the same time. (NEDO)

  15. International research cooperation in fiscal 1997. Report on the results of researches for the development of tribo-materials; 1997 nendo kokusai kenkyu kyoryoku jigyo. Tribo material no kaihatsu chosa seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Researches were conducted for the development of tribo-materials for the improvement of energy efficiency for equipment with slide members usable for example aboard automobiles, and the result is reported for fiscal 1997. In the research for the creation of substrate materials, some metals different in hardness, iron-base materials, titanium-base materials, etc., were selected, and experiments were conducted to disclose the effect of the substrate hardness/surface roughness on the critical load under which gas phase coatings fracture. In the research about surface treatment, the arc ion plating method is employed to produce TiN coatings on substrates of SKD11 and Ti-6Al-4V, and the critical loads were evaluated using a heavy duty, acoustic detection type adhesion evaluator and a sliding wear tester. Furthermore, the substrate/coating interface is subjected to observation under high-resolution transmission electron microscope. As for the evaluation of coating characteristics, the effects of the hardness of the coating itself, Young`s modulus, and toughness on the fracture of the coating were investigated. During the international joint researches, information was exchanged with National Institute for Standards and Technology, U.S. 11 refs., 64 figs., 4 tabs.

  16. Fiscal 2000 survey report on overseas geological structure, etc. Project for exchanging experts - Exploration technology (Indonesia); 2000 nendo kaigai chishitsu kozo to chosa hokokusho. Gijutsusha koryu jigyo - Tansa gijutsu bunya (Indonesia)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the stabilization of coal supply/demand in the APEC (Asia-Pacific Economic Cooperation Conference) region and for the stable supply of coal to Japan, Japanese engineers and experts were dispatched to Indonesia, where coal production was remarkably increasing and efforts were being actively exerted to develop new coal mining fields, for training Indonesian specialists there, and Indonesian specialists were invited to Japan for training here. Japanese instructors on dispatch delivered lectures on coal geology, exploration, and exploitation at the human resource development center of Bandung City during the period July 20 through August 4, 2000, which was followed by a coal outcrop survey training session in the field. The trainees were from Kalimantan, Sumatra, Java, etc., and numbered 30. The trainees invited to Japan received lectures and training related to coal geology, exploration, and mining programs during the period October 19 through November 18, 2000, at the Geological Survey of Japan, Agency of Industrial Science and Technology, Ministry of International Trade and Industry; Matsushima Coal Mining Co., Ltd.; Enzan Plant, Tone Corporation; DIA Consultants Co., Ltd.; and Mitsubishi Materials Corporation. (NEDO)

  17. Report on the project for working out the new energy vision of the Chinen Village area in FY 2001; 2001 nendo Chinen son chiiki shin energy vision sakutei tou jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For the purpose of promoting the introduction of new energy and enhancing the awareness of it in Chinen Village, Okinawa Prefecture, an investigational study was conducted of the trend of energy consumption of the village, existence amount of new energy, case study for new energy introduction, etc., and a vision was worked out. The energy consumption amount of Chinen Village in FY 1999 was estimated at 591,935 x 10{sup 3} MJ/y. By sector, the consumption amount in the transportation sector was the highest, approximately 40%, followed in order by the household sector, business sector and industrial sector. The rate of energy source was 49.2% of petroleum, 42.3% of electric power and 8.5% of gas. As the case study for new energy introduction, the following were studied: introduction of photovoltaic power generation to the village office/Azama Sun Beach/hydroponics/JA branch office/prawn farm, introduction of photovoltaic power generation/wind power generation to the village gymnasium/village drainage pump/refrigerating facilities of the fisheries cooperative association, etc. Further, as the new project, the following were studied: introduction of photovoltaic power generation/wind power generation to the agricultural irrigation project/comprehensive sports park, introduction of photovoltaic power generation to the new building of Chinen Elementary School/maker of processed medicinal herbs. (NEDO)

  18. FY 2001 report on the results of the survey of the formation promotion subsidy project on the environmentally friendly type energy community. Survey of the commercialization of high efficiency power generation using fuel of waste such as waste construction materials; 2001 nendo kankyo chowa gata energy komyuniti keisei sokushin hojo jigyo. Kensetsu haizai tou haikibutsu nenryo ni yoru kokoritsu hatsuden no jigyosei chosa chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    The paper studied a system for power generation and heat utilization using wood chips such as waste construction materials, used paper inappropriate for recycling and plastic refuse from neighboring local governments as fuel and assessed a potentiality of the commercialization. As to the system, the following were conducted: selection of the optimum combustor in the waste power generation, survey of the state of corrosion of boiler tube in the steam conditions and waste properties, selection of the optimum quality of boiler materials, etc. In the assessment of a potentiality of the commercialization, the commercialization was studied as in-house power generation/heat utilization business with a power generation scale of 9,950kW and a steam supply scale of 31.5t/h. As a result of the study, the energy conservation effect was found to be expected as follows: reduction of 33,000kL/y crude oil equivalent and reduction of 16,000t-CO2/y emission. As a result of studying the economical efficiency of business, the unit price of wood chip purchase and the unit price of waste plastic treatment which are required to recover the difference of the initial investment within 5 years were greatly different from the level as an aim. For the realization as business, a subsidy of 15% and more cost reduction were requested. (NEDO)

  19. Fiscal 1994 survey of the base arrangement promotion for foreign coal import. Project to heighten the quality of subbituminous coal by low temperature carbonization process; 1994 nendo kaigaitan yunyu kiban seibi sokushin chosa. Teion kanryuho ni yoru arekiseitan no kohinshitsuka jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    The low-temperature carbonization process of coal is a technology to produce high grade reformed coal corresponding to bituminous coal and coal oil corresponding to heavy oil from subbituminous coal and supply them at prices close to the present market ones. From viewpoints of diversified sources and multiple export harbors, an initial-stage survey was conducted of the whole flow from new development of undeveloped mining areas in the northwest of Sumatra, Indonesia to bringing by ships to Japan of products reformed by LFC process of the US SGI`s low-temperature carbonization technology. Clean coal prepared after mining is produceable at a little higher than $12. At processing ability of 10,000 tons/day of raw coal, production is expected of approximately 5,700 tons/day of solid products of more than 6,500 kcal/kg and approximately 1,000 tons/day of low sulfur C heavy oil class oil. The finished cost of solid products is about $25/ton, which becomes about $40/ton at the harbor price in Japan. In conclusion, the project to enhance the quality of subbituminous coal by the low-temperature carbonization is promising as a total system. 10 refs., 54 figs., 30 tabs.

  20. Investigations in fiscal 1983 on promotion of geothermal development. Part 1. Report on investigation of fumarolic environmental effects in Oku-Aizu area; 1983 nendo chinetsu kaihatsu sokushin chosa. 1. Okuaizu chiiki funkichu kankyo eikyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1984-03-01

    As part of the investigations on promotion of geothermal development, surveys have been carried out in the Oku-Aizu area to identify the existence and/or extent of effects of collecting geothermal fluids above the ground imposed on the environment, such as the natural ecological system. The investigated area is an area of 60 km{sup 2} covering Kawanuma County and Onuma County in Fukushima Prefecture, a mountainous area with undulations. The investigation result may be summarized as follows: the area shows the inland climate and has snow fall as much as 2 m in winter; according to the H2S diffusion prediction, the concentration thereof on the land in seasonal average is 0.7 ppm at maximum, which is a value presenting no problems. No fumarolic effects of SO2 were identified, and floating dust and Hg showed values that present no problems. With regard to water quality during and after the blowout test, no effects of blowout return were identified. The noise level was 41 to 45 phones at a place 100 m distant, and the vibration level has become the lower detection limit at a place 50 m distant. Leveling has discovered no ground movement. No variation in major constituents in thermal spring water was verified before and after the blowout test. (NEDO)

  1. Fiscal 1999 geothermal development promotion survey. Development potentiality survey - Strategic survey/nation-wide survey (Report on districts in Fukushima Prefecture); 1999 nendo chinetsu kaihatsu sokushin chosa. Kaihatsu kanosei chosa - senryakuteki chosa zenkoku chosa (Fukushimaken chiiki hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-08-01

    For the effective implementation of the survey, data in existence were reanalyzed for the Bandai-Azuma district and Minami-Aizu/Nasu district, and a wide area geothermal model was built. Using the model, exploitable resources were assessed and a prioritized survey introduction program was worked out for the promotion of geothermal development. In compliance with the strategic survey implementation manual, the Bandai-Azuma district was assessed, and the northeastern-eastern foot area of Azuma Volcano and the northern foot area of Adatara Volcano were extracted as areas promising geothermal energy development. The Monte Carlo method was applied to the prioritized survey area at the northeastern foot of Azuma Volcano, and then it was estimated that, with a probability of not less than 90%, the exploitable resources would be 6.4MWe in the case of data accuracy of 0.5 or more and 12.0MWe in the case of data accuracy of 0.4 or more. Selected as promising areas in the Minami-Aizu/Nasu district were the Yanaizu-Nishiyama area, the neighborhood of Nasudake-Chausudake, and the neighborhood of Shiobara-Fuji. (NEDO)

  2. FY 1999 report on the data processing of the geothermal development promotion survey. No. B-6 Tsujinodake area (Tertiary); 1999 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. No.B-6 Tsujinodake chiiki (dai 3 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-01-01

    For the purpose of confirming the existence of geothermal reservoirs, this survey was conducted as Survey B in the range of 30km{sup 2} east of Lake Ikeda at the south east end of Satsuma Peninsula, Kagoshima pref. from FY 1997 to FY 1999. By the geology/alteration zone survey, fluid geochemical survey, electromagnetic survey and gravity survey which were conducted in FY 1997 as surface survey, the following three were extracted as the areas which have great potentiality of geothermal resource existence: 1) area along the Yamakawa-Matsugakubo structure line on which calderas and explosion craters lie (north part); 2) area along the Takeyama-Tsujinodake structure line on which Ata central dome volcanic rocks lie (central part); 3) area around Kozukahama where the south wall of the Ata caldera extends in east-west direction (south part). In the survey after that, in north part, it was considered that aquicludes in clayey alteration zone were widely distributed around levels of 100m above - 200m below sea level and there existed geothermal reservoirs under the aquicludes. It was presumed that the mixed water of sea water and surface water was thermally conducted by heat sources of 300-490 degrees C and geothermal reservoirs of 260-270 degrees C were formed. (NEDO)

  3. Fiscal 1999 geothermal energy development promotion survey. Report on survey of structural boring (No. B-7 Kuwanosawa area); 1999 nendo chinetsu kaihatsu sokushin chosa. Kozo shisui chosa koji oyobi kaiseki hokokusho (No.B-7 Kuwanosawa chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    Borehole N11-KN-1 was digged and investigated for clarifying the geothermal structure of the Kuwanosawa area, with attention fully paid to the existing survey results. The hole is inclined, 1,802.30m deep in total, with a casing pipe installed down to the 1,101.76m level. Temperature was measured and electrical logging was performed at levels 410m, 1,110m, and 1,802.23m while the hole walls were still exposed bear. The maximum temperature of 161 degrees C was observed at the hole bottom, and the product of permeability - layer thickness transmission coefficient was described by 3.72 to 4.75 times 10{sup -1} darcy.m. The geothermal structures in presence in the south-western part of the survey area and along the Wasabizawa fault were made clear, and it was found that there exists no high-temperature water system in the vicinity of borehole N11-NK-1. As tasks for the future, it was proposed that a geothermal survey of the south-eastern part which includes borehole N57-YO-2 and a geochemical survey of fluids including hot spring water and surface be conducted. (NEDO)

  4. FY 1998 report on the comprehensive analysis in the geothermal development promotion survey. Tertiary. No.C-3 Akinomiya area; 1998 nendo chinetsu kaihatsu sokushin chosa sogo kaiseki hokokusho. No.C-3 Akinomiya chiiki (Dai 3 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The geothermal development promotion survey was conducted in the Akinomiya area, Ogachi county, Akita prefecture, and the FY 1998 results were summed up. In the surface survey, geology/electromagnetism/precision gravity survey was made as supplementary survey, and re-analysis of 3D models was made. In the well survey, three wells of N10-AY-6 to N10-AY-8 were drilled to conduct the core examination, temperature/pressure logging, sampler logging, short-term jetting test, etc. Also conducted were the reservoir evaluation, environmental effect survey, etc. by pressure monitoring and water level observation. The results of the comprehensive analysis predict the following. In the Akinomiya area, there exists heat source in deep parts around Mt. Yamabushi-dake and Mt. Takamatsu-dake; Being given heat from this heat source, rocks, ground water and volcanic gas react on each other to form geothermal fluids. It is presumed that high temperature geothermal reservoirs exist in the east of the area. Moreover, the pressure distribution indicates that the Akinomiya reservoir and Wasabizawa reservoir can be a chain hydraulically. On the other hand, the west of the area is the low temperature and heat conductive area, and therefore, there seem to be no high temperature fluids there. (NEDO)

  5. FY 1999 report on the comprehensive analysis of the geothermal development promotion survey. Forth. No.C-3 Akinomiya area; 1999 nendo chinetsu kaihatsu sokushin chosa sogo kaiseki hokokusho. No. C-3 Akinomiya chiiki (Dai 4 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-01-01

    As part of the geothermal development promotion survey, the comprehensive analysis was made on the survey of the existence amount of geothermal resource in the Akinomiya area, Ogachi town, Akita prefecture, which was conducted in FY 1999. In the evaluation of reservoirs, the following were carried out: comprehensive analysis of various data on the surface survey, well exploration, etc., which were stored in surveys from the primary to the forth, modification/construction of geothermal system models, numerical simulation using 3D models, etc. In the long-term jetting test, production/reduction tests were conducted using N9-AY-3 and N10-AY-8 as production wells and N8-AY-1 and N10-AY-6 as reduction wells. The results of the comprehensive analysis were outlined as follows. The distribution of high temperature zones promising as areas for geothermal development was grasped. The distribution of the main fracture structure underground was grasped. A total amount of 124t/h steam was confirmed by short/long term jetting tests. In the simulation of prediction of production, the result was obtained that there was potential power generation of 30MW in the Akinomiya area alone and 60MW both in the Akinomiya area and the Wasabizawa area. (NEDO)

  6. Fiscal 1999 geothermal development promotion survey. Structural boring survey work and analysis report (No.B-6 - Tsujinodake area); 1999 nendo chinetsu kaihatsu sokushin chosa. Kozo shisui chosa koji oyobi kaiseki hokokusho (No.B-6 Tsujinodake chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    Cuttings from bores N11-TD-2 and N11-TD-3 drilled for the purpose of confirming the existence of geothermal resources in the Tsujinodake area were examined and tested, and the results of temperature logging, electrical logging, and water injection tests carried out during the structural boring work were analyzed. Activities were conducted in the four fields of (1) test boring work, (2) survey and measurement, (3) core cutting examination, and (4) comprehensive analysis. In bore N11-TD-2 positioned in the northern part of Tsujinodake, a sharp temperature rise was detected in the clay converted alteration zone between 200m above sea level and 200m below sea level. A high temperature of 215 degrees C was recorded at 200m below sea level, and it was found that high temperature geothermal water was in reserve at the bottom of the clay converted alteration zone between 100m above sea level and 200m below sea level. In bore N11-TD-3 in the southern wall of the Ata caldera, a convection type low temperature profile was observed at a shallow level and low temperature convection of underground water was detected there. (NEDO)

  7. FY 1992 report on the survey of geothermal development promotion. Geochemical survey (Survey of geothermal water) (No.36 - Hongu area); 1992 nendo chinetsu kaihatsu sokushin chosa. Chikagaku chosa (Nessui no chosa) hokokusho (No.36 Hongu chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-07-01

    The test on jetting of geothermal water by the induced jetting, sampling of geothermal water and analysis/survey were carried out in the structure drilling well of N4-HG-2 in the Hongu area, Wakayama Prefecture. The induced jetting of the well was conducted by the Swabbing method up to the total pumping amount of 459.9m{sup 3} that is equal to about 24 times as much as the inner quantity of the well, but it did not result in jetting. The maximum temperature of geothermal water was 65.6 degrees C, pH was 6.6-7.5, electric conductivity was 2,800-2,900 {mu}S/cm, and Cl concentration was 500-700ppm. The geothermal water was classified into the HCO{sub 3} type that is neutral, and the spring quality and liquidity were the same as those of existing hot springs in this area. In the Hongu area, the distribution of new volcanic rocks has not known. The K-Ar age of quartz porphyry intrusive rocks was made about 13Ma, and it was considered that a possibility was low of the rocks being heat sources of geothermal activities. It was also considered that the geothermal water/hot spring water in this area, which originate in the surface water, were heated in heat transfer by magma activities in the deep underground and were flowing forming a small scale of hydrothermal convection system. (NEDO)

  8. Survey on acceleration of geothermal development in fiscal 1998. Report on survey for influence on environment (No. B-7, Kuwanosawa district); 1998 nendo chinetsu kaihatsu sokushin chosa.Kankyo eikyo chosa hokokusho (No. B-7 Kuwanosawa chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    A survey was performed on the current situation in the Kuwanosawa district in Akita Prefecture to identify influence on the surrounding environment due to drilling of geothermal structure testing wells. The survey on animals covered mammals of five divisions, 10 families and 19 species, Aves of ten divisions, 25 families and 73 species, reptiles of one division, 3 families and 6 species, Amphibia of two divisions, 6 families, 9 species, and Insects of 17 divisions, 179 families and 719 species. Precious animals of a several species including black salamander were identified. In the plant survey, 132 families and 670 species were identified, with several species listed as the precious plants. In the survey of hot springs, those at three locations were all high-temperature hot springs at as high as 53.8 to 96.9 degrees C. Amount of discharge, pH and electrical conductivity differ largely by the hot springs. The hot spring in Takamatsu did not show large variation throughout the survey period. The Ogura Inn at Doroyu Spa has small variation in pH and hot spring temperature, but large variation in the amount of discharge and Al{sup 3+} concentration. Correlation was recognized between hot spring temperature and amount of discharge, between hot spring temperature and anion, between amount of discharge and electric conductivity, and between amount of discharge and anion. (NEDO)

  9. Fiscal 1998 geothermal development promotion research. Survey in Akinomiya area (N9-AY-3 short-term blowout test report); 1998 nendo chinetsu kaihatsu sokushin chosa. Akinomiya chiiki chosa (N9-AY-3 tanki funshutsu shiken hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    As a part of the fiscal 1998 geothermal development promotion survey in Akinomiya area, this test was carried out to obtain the fumarolic gas characteristics and fluid properties of N9-AY-3 test well by air reaction method. Blowout hot water was reinjected to N8-AY-1 test well drilled in fiscal 1996 to confirm its reinjection capacity. The fumarolic gas test result showed a steam volume of 35.0t/h and hot water volume of 160.8t/h (wellhead pressure equivalent) at a wellhead secondary valve opening of 33.7% and wellhead pressure of 15.3kg/cm{sup 2}G. The whole hot water volume of 30,214m{sup 3} is equivalent to nearly 320 times more than a well volume. Hot water showed pH7.7-8.6, an electric conductivity of 3,960-7,070{mu}S/cm, and chlorine ion concentration of 1,050 mg/l. Alkalescent Na-Cl system hot water showed a geochemical temperature of 283 degreesC. A steam gas concentration including CO{sub 2} as main component was 0.12-0.19vol%. Blowout hot water was continuously reinjected into N8-AY-1 well from a pit by pump to confirm its reinjection capacity. The reinjection capacity of hot water in fumarolic gas was 110t/h without any problem. (NEDO)

  10. Fiscal 1999 geothermal development promotion survey report. Structural boring survey work and analysis (No. B-5 - Musadake region); 1999 nendo chinetsu kaihatsu sokushin chosa. Kozo shisui chosa koji oyobi kaiseki hokokusho - No. B-5 Musadake chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    For geothermal development in the Musadake region, Shibetsu-gun, Hokkaido, structural boring was carried out and boreholes were inspected. In the structural boring survey, borehole N11-MD-3 was drilled as deep as 2,001.18 m, and borehole N11-MD-4 2001.44 m. Performed or tested for each of the two boreholes were temperature logging, electrical logging, temperature recovery, reinjection, core cutting examination, and so forth. The result of the temperature logging shows that temperature rise is slower at levels deeper than 1280 m in borehole N11-MD-3, with the maximum temperature marking 274 degrees C, and, in borehole N11-MD-4, the maximum temperature is 198 degrees C. No reinjection test is carried out because the ground pressure is too high to allow the replacement of the borehole content with fresh water. Analysis results lead to a conclusion that the hot fluid in this region originates in fossil seawater and in meteoric water, the latter arriving after a long-term permeation process, heated by thermal conduction to 270 degrees C or higher. It is inferred that the geothermal fluid flows in a fissure in the vicinity of the Musadake/Mt. Shitabanupuri fault and a fault orthogonally crossing the said fault for the formation of a high-temperature geothermal storage. (NEDO)

  11. Report on the surveys in fiscal 1999 on the summary of new energy proliferation and promotion policies in the U.S.A.; 1999 nendo Beikoku ni okeru shin energy fukyu sokushin seisaku no gaiyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper reports the surveys in fiscal 1999 on the summary of new energy promotion policies in the U.S.A. The ratio of regenerative energies to all energy in the U.S.A. is 10%. On the other hand, efforts are given on marine energy investigations, and to make hydrogen useful as one of the energy sources. The Matsunaga hydrogen research and development act was enacted in 1990, and so was the hydrogen's future act in 1996 to move positively forward the development thereof. The federal government has announced positive use of substitution fuel using automobiles in the presidential ordinance, whereas the ratio of the substitution fuel cars accounted for in those used by governmental organizations is planned to be 75% in fiscal 1999. At the Kyoto Conference for Global Warming-up Prevention, America was obligated to reduce by 2012 the greenhouse effect gas by 7% against the generation in 1990, but it rejected the proposition saying the country is unable to approve it without participation of developing countries. In 1998, America announced the collective national energy strategy, and recommended utilization of regenerative energies to prevent climate changes. In April 1999, President Clinton issued the plan for governmental greening, and ordered suppression of generation of air polluting substances. In August of the same year, a presidential ordinance was promulgated on developing and promoting use of the bio-energies. (NEDO)

  12. FY 1999 report on the data processing of the geothermal development promotion survey. No. A-4 Kunbetsudake area (Secondary); 1999 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. No.A-4 Kunbetsudake chiiki (dai 2 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-10-01

    This survey studies possibilities of geothermal resource existence by checking the presence of high temperature anomaly by a wide-area survey with the aim of extracting the area for Survey B and Survey C to be conducted. The area for survey is an area of approximately 300km{sup 2} including Shibetsu town, Shibetsu county, and Rausu town, Menashi county, which are located east of Hokkaido. Conceptual models of the geothermal system in this area which are thought of from the results of the survey are as follows. It is assumed that heat source exists deeply in Unabetsudake (Mt. Unabetsu). From the fact that the K-Ar method age of the ejecta is 0.5Ma and the TL method age of the rate. (NEDO)ch the position of drilling of the well for survey of heeffective as heat source. It is thought that the water of hot spring/mineral spring came to indicate various spring qualities by mixture of meteoric water and fossil seawater at various ratios. The fossil seawater and old meteoric water are being heated by thermal conduction. The mixture with the original water of Kawakita hot spa is recognized in Shibetsu Kanayama hot spa. It is assumed that the high temperature area exists mostly in Unabetsudake, but the spread does not reach the position of drilling of the well for survey of heat flow rate. (NEDO)

  13. Report of a project for the technical development of the environmental preservation and resource effective utilization system in fiscal 1995; 1995 nendo kankyo hozen shigen yuko riyo system gijutsu kaihatsu jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The paper outlined the present situation of industrial waste all over Japan and the present situation of industrial waste of large urban areas where it is most difficult to secure places for the final disposal, and conducted an analysis on the present and future amount of final disposal waste. According to the literature from the Ministry of Health and Welfare, `research report on the discharge/treatment situation of the industrial waste` and `research results of administrative organizations for industrial waste,` the situation of final disposal from the past to the present was outlined and analyzed to study the future trend. Out of the administrative divisions of Japan, four divisions, which are all typically called large urban areas, were selected, and the situation of industrial waste in large urban areas was outlined and analyzed according to the questionnaire survey and the literature on industrial waste obtained from each administrative division. The survey by the Ministry of Health and Welfare indicated that the volume of the industrial waste discharged from the whole country amounted to approximately 400 million tons in fiscal 1992. However, helped by the improving recycling of waste construction materials, the amount of final disposal around 2000 is presumed to be less by 20% or so than that in 1992. 58 refs., 5 tabs.

  14. Fiscal 2000 survey of geological structures overseas. Exchange of engineers with Indonesia (Coal mining technology); 2000 nendo kaigai chishitsu kozo nado chosa hokokusho. Gijutsusha koryu jigyo (tanko gijutsu bun'ya) Indonesia

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Indonesia rich in coal resources consumed 70-million tons of coal in 1999, which covered 17% of its total energy demand. It is estimated that as much as 120-million tons will be produced in 2005, and it is expected that underground mining will increase. Under such circumstances, Indonesia strongly desires that Japan's underground mining technologies be transferred to Indonesia. For the transfer of technologies especially involving production control and management out of Japan's underground mining technologies, Japan dispatched engineers to Indonesia under a mining engineer exchange project, and received and trained Indonesian engineers. Under the engineer exchange project, five engineers were dispatched to Indonesia and gave lectures and on-site training in the period July 9 through August 5, 2000. Japan received seven engineers, who were given lectures and training at the Ikeshima mining field of Matsushima Coal Mining Company in the period November 12 through December 12, 2000. (NEDO)

  15. Fiscal 1999 technical survey report. Basic survey for energy consumption rationalization and cooperative project on energy conservation seminar; 1999 nendo energy shohi koritsuka kiso chosa oyobi sho energy seminar kyoryoku jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-06-01

    A survey was conducted of Myanmar's energy-consuming industries for exploring the feasibility of introducing practical energy conservation techniques and facilities to this country and for collecting basic data for the implementation of the project in the future. On the other hand, some lecturers were dispatched to an energy conservation seminar which was held in cooperation with the Government of Myanmar. Visited during the basic survey were (1) the Kyan Gin plant of Myanmar Ceramic Enterprise representing Myanmar's cement making industry, (2) the Thanlyin plant of Myanmar Petrochemical Enterprise representing Myanmar's oil refining industry, and (3) the Siftong plant of Myanmar Paper and Chemical Enterprise representing Myanmar's paper making industry. In the study of energy conservation measures for which stabilization of operation through reinforced facility maintenance and management were required, it was concluded that much time was necessary before Japan's advanced energy conservation technologies might be introduced into Myanmar. Three to six propositions were presented to each of the three plants. At the seminar, the importance of energy conservation promoting measures and the results of the basic survey were introduced to the audience. A lecture meeting was also held to familiarize some participants with NEDO-DB (Database of New Energy and Industrial Technology Development Organization). (NEDO)

  16. Fiscal 1998 survey report. Assessment and analysis of collected data in wind power generation field test project; 1998 nendo furyoku hatsuden field test jigyo ni okeru shushu data hyoka kaiseki chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Examination was made on wind conditions, power generating characteristics, and the reliability of a system by analyzing the operation record of the wind power generation equipment which was installed at Hiraizumi-cho, Nishi-Iwai gun, Iwate prefecture and at Misaki-cho, Miura-shi, Kanagawa prefecture. The equipment at Hiraizumi had a rated output of 490 kW, and at Miura 400 kW. The period of the examination was from April, 1998 through February, 1999, the items for data collection being the generator output, generated energy, average wind velocity, record of abnormality occurrence, and maximum wind velocity. At Hiraizumi, annual average utilization rate was 12.9%; annual average operation rate, 49.9%; average wind velocity, 4.6 m/s; and maximum wind velocity of the period, 31 m/s. At Miura, annual average utilization rate was 16.5%; annual average operation rate, 77.0%; and average wind velocity, 5.0 m/s. The utilization rate is desirably 17%. The top three abnormalities were drop in AC control voltage, actuation of main shaft brake and eddy current/actuation of open phase relay, accounting for 83.3% of the total abnormalities at Hiraizumi, while they were unbalance in current, grid drop and automatic unwinding of cable, accounting for 74.5% at Miura. (NEDO)

  17. Report on the survey of the commercialization of wood biomass energy. Project on the production of wood pellet fuel; 2001 nendo mokushitsu baiomasu energy jigyoka chosa hokokusho. Mokushitsu peretto nenryo seizo jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For the purpose of regenerating forestry and contributing to the policy for prevention of global warming, a potential study was made of the commercialization of the wood pellet using low-quality wood materials such as thinnings and wood pieces from lumber mill. In the study, based on the survey of raw materials of wood pellet and the demand amount, the scale of pellet production was assumed, and subjects were arranged toward the basic design of plant, evaluation of economical efficiency and commercialization. As a result of the study, the following subjects were extracted. In the study, the supply of lumbers of 2,800 t/y and securing of demand of about 1,600 t/y were set forth as a premise, but the subject was to secure the initial demand. The pellet combustor was higher in price than the kerosene combustor, and for the imported combustion equipment, the combustion of white pellet was supposed. It is necessary to develop combustor of pellets including the bark. In the trial calculation of the unit price of heat utilization (yen/Mcal), the pellet stove was about 3.3 times as high in price as the kerosene stove. It is necessary to reduce the pellet price down to 30 yen/kg or so by decreasing the cost of pellet production. (NEDO)

  18. FY 2000 report on the promotion projects by Research Institute of Innovative Technology for the Earth. Proceedings of the international seminar (Reports presented to the international workshop for selective oxidation catalysts); 2000 nendo chikyu kankyo sangyo gijutsu kaihatsu suishin jigyo kokusai seminar jigyo shiryo. Sentaku sanka shokubai kokusai workshop hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Described herein are the FY 2000 results of the international workshop for selective oxidation catalysts, promoted by RITE. The session of methane activation includes a comprehensive lecture on designs of selective alkane oxidation catalysts developed since the 1980s, describing the simplified catalyst design procedures and, at the same time, pointing out the vapor-phase reactions governing the overall reactions at high temperature. The session of alkane oxidation includes a lecture on oxidation of ethane into acrolein in the presence of a silica catalyst supporting isolated active sites, stressing necessity for controlling the vapor-phase reactions and importance of isolating the active sites. The session of crystalline materials includes a lecture on Ti-siting in Ti-containing molecular sieve and selective oxidation catalyst functions, concentrating discussion on oxidation with H{sub 2}O{sub 2} as the oxidant on TS-1. The session of engineering hybrid includes a lecture on catalytic partial oxidation of alkanes in millisecond reactors, describing that possibility of controlling the vapor-phase reactions in the presence of monolith, porous-plate catalysts in a reactor through which the reactant gases pass in a very short time, of the order of millisecond. (NEDO)

  19. FY 2000 report on the survey project on potentiality of the environmental harmony coal utilization system. Potential study of the circulating fluidized bed boiler model project in Vietnam; 2000 nendo kankyo chowagata sekitan riyo system kanosei chosa jigyo hokokusho. Vietnam ni okeru junkan ryudosho boiler model jigyo jisshi kanosei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    In Vietnam, survey was conducted of the project in which the adoption of circulating fluidized bed boiler (CFB) makes energy conservation and greenhouse effect gas reduction possible. CFB makes a marked decrease in SOx emission possible by using limestone as combustion bed material. As a result of the survey, the thermal power plant was not suitable for the model project due to its large size. However, it was found that two cement plants and one fiber plant having coal-fired boiler were suitable for survey. Nghi Son and Bim Son cement plants are typical cement plants in Vietnam. As a result of the hearing, they were eager to adopt CFB equipment. As to environmental improvement effects, in the thermal power plant with power source loads, emissions of SOx and NOx can be reduced by 79.0% and 72.5%, respectively. Further, in Nam Dinh Textile Company, emissions of SOx and NOx can be reduced by 79.8% and 84.6%, respectively, in case of converting boiler from the existing stoker boiler to CFB boiler. (NEDO)

  20. Project report for fiscal 1998 on the research cooperation promotion project/research cooperation related to practical use of a thermal efficiency enhancing system for use in thermal power plants; 1998 nendo kenkyu kyoryoku suishin jigyo / karyoku hatsudensho ni okeru netsu koritsu kojo system no jitsuyoka ni kansuru kenkyu kyoryoku jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Thermal efficiency enhancing system technology for existing thermal power plants is studied jointly with Indonesia to achieve energy conservation and power generation cost reduction and serve for suppressing CO2 emission. Site investigations were carried out for the study on enhancing thermal efficiency in component devices, including improvements in a device to rinse small pipes in condensers and in materials used in air preheaters, as well as for heat management and efficient operation of the plants. Indonesian engineers were received to develop device designing and thermal efficiency controlling programs, and for technical guidance. Site seminars were held to proliferate the achievements. Under the trend of increasing electric power demand, Indonesia is apt to place first priority on stabilized operation of power plants, with the efforts of thermal efficiency management staying behind partly due to fossil fuel price being low. The present project has made it possible to utilize hereafter the result of the rough design on improving the thermal efficiency in existing thermal power plants as has been done under the present project. Receiving the researchers and holding the site seminars also helped transfer the technologies on the thermal efficiency improving processes, and device maintenance and management methods. The project has also contributed to the consciousness reformation. (NEDO)

  1. Report on achievements in proliferation project to introduce environment harmonizing type coal utilization system in fiscal 1998. Joint demonstration project for CMG recovery and utilization system in fiscal 1998; Kankyo chowagata sekitan riyo system donyu shien nado fukyu taisaku jigyo. 1998 nendo CMG kaishu riyo system kyodo jissho jigyo seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    This paper describes the discussion report for fiscal 1998 on the CMG (coal methane gas) recovery and utilization project to be implemented from fiscal 1998 through fiscal 2002 at Tiefa Mining Bureau of Liaoning Province in China. The Daixing mine was selected as the survey object. The introduced technologies and facilities include test drilling for degassing (medium measure horizontal degassing of 300-m class), induction from degassing holes, fly ash sealing, sealed gas degassing, surveillance and control technologies and facilities. The recovered gas is to be supplied to the cities of Tiefa and Tieling as town gas, for which compressed gas feeding and controlling technologies and facilities will be introduced. This paper lists the gush-out quantity (1,000 Nm{sup 3}), the recovery quantity (1,000 Nm{sup 3}), the recovered gas concentration (%), the utilization quantity (1,000 Nm{sup 3}), and the utilization rate (%). The figures for the respective items before and after the implementation are 128366, 32949, 44.5, 7000, 5, 123500, 43890, 49.1, 39826, and 32. The quantity of gas gushing out at facings decreases in association with increase in the recovered gas quantity, whereas the gas concentration at facings in the Daixing mine in 2003 is estimated to decrease to 0.1%, contributing to safe mining operation. The test drilling for medium measure horizontal degassing expands the degassing assured scope per one test drilling seat, and can reduce the total test drilling length and construction amount. (NEDO)

  2. Research report of fiscal 1997. Basic research project on energy saving in developing countries (cooperative research on oil saving / basic research on the industry of Thailand); 1997 nendo chosa hokokusho. Hatten tojokoku energy shohi koritsuka kiso chosa nado jigyo sekiyu shohi koritsuka kyoryoku chosa (Taikoku sangyo kiso chosa hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Field research was made for oil saving in Thailand. To promote energy saving in a textile industry as main export industry, its motivation for production stuff is essential in business improvement. Proposal for work improvement, supply system of bonuses, and small-group activity are effective. Management of an energy consumption rate is essential in business management. Use of efficient waste water treatment equipment is also one of the issues. In food factories, various scopes for improvement are still found by mass/heat balance analysis in production process. As an example, a large amount of water is consumed in vain for washing raw rice in a rice powder factory, and separation of SS precipitate from waste water should be improved. Because of lagoon treatment, an effluent standard is not achieved in spite of consumption of wasteful aeration power. This treatment is reasonable because of its scale and site, although the standard can be achieved by activated sludge method. Reconsideration of the standard is also necessary based on a local total BOD load capacity. The profitability of a methane fermentation method should be examined. 72 figs., 95 tabs.

  3. FY 1999 geothermal development promotion study. Report on results of the elastic wave exploitation (reflection method) in No.B-5, Busadake area; 1998 nendo chinetsu kaihatsu sokushin chosa. Danseiha tansa (hanshaho) hokokusho No.B-5 Busadake chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Described herein are results of the elastic wave exploitation (reflection method) conducted in the Busadake area in Hokkaido to elucidate the geological and geothermal structures. The elastic wave exploitation used large-size vibrators, an explosive and 4 courses of traverse (total length: 25.675 km, number of vibration-receiving points: 1,031, and number of vibration source points: 342). The data were processed by the standard procedure of the common reflection synthesis method. The acoustic velocity logging data, collected at the structural drillings N10-MD-1 and N10-MD-2, were synthesized to have the reflection seismic records. The existing surface geology, drilling geology and gravity data were compared with the recorded deep sections for the comprehensive discussion, to extract the reflection horizon corresponding to the geological boundary, and investigate the relationships of the discrete lines of deposit structures, unconformity relations and reflection with geological and default structures determined by the data analysis. The study results of the geothermal structures suggest possible formation of the geothermal reservoir deep in the west of the default found by Line-1, based on the observed temperature structures at the drilling N7-SB-1. (NEDO)

  4. General evaluation survey report on fiscal 1998 investigation of geothermal development and promotion. No.C-3 Akinomiya area (Third); 1998 nendo chinetsu kaihatsu sokushin chosa sogo hyoka chosa hokokusho. No.C-3. Akinomiya chiiki (dai 3 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    With Akinomiya area (11.4 km{sup 2}) selected in Akita prefecture as the survey C area in fiscal 1996, the first survey was conducted. This paper is a summary of memorandum from an advisory standpoint on the evaluation survey concerning the fiscal 1998 investigation results. The contents of the survey are geological investigation, precision gravity exploration, soil gas investigation, electromagnetic exploration, fluid chemical investigation, well drilling and short-term eruption test. An alteration zone was recognized around the place where clay minerals used to be mined, with the center of the zone situated 500-600 m east of a fault. The alteration condition of Akinomiya area seems to be different from that of Doroyu Wasabisawa area. The supplementary gravity survey was carried out at total 58 points in fiscal 1998. It is desirable to set supplementary measuring points over a wide surrounding area for a depth structure analysis. Also performed was a study of mercury concentration in the soil gas. While CSAMT and TDEM methods were employed for the electromagnetic exploration, a suitable method should be carefully selected for a wide area high-density exploration. Consistency with adjacent areas is essential in preparing investigation items particularly for a geothermal model. (NEDO)

  5. Fiscal 1998 report on data processing for geothermal energy development enhancement. No. A-4 Mount Kumbetsu area (primary data processing); 1998 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. No.A-4. Kunbetsu chiiki (dai 1 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    This is part of the state-operated 'geothermal energy development enhancement' project, under which a comprehensive analysis is conducted into the results of a survey of geothermal resources in existence in the Mount Kumbetsu area. The local geothermal structure is examined, and the Kumbetsu hot spring area, the Uebetsu river middle reach area, and the Unabetsu hot spring area are extracted as promising high-temperature supply areas. The Kumbetsu hot spring area and the Uebetsu river middle reach area lie on a heave positioned west of the Mount Musa/Mount Shitabanupuri fault. There is a distinguished bending in the zone of discontinuous resistivity, and, when geology is considered, it is inferred that there exists a geothermal fluid field formed by the Mount Musa/Mount Shitabanupuri fault running NNW-SSW and a fracture zone that runs across the fault. The two areas are located at spots where gravity gradient is sharp. It is concluded that, with the alteration zone, temperature distribution, etc., also taken into account, the Kumbetsu hot spring area is the more promising as a source of geothermal energy. The water of the Kumbetsu hot spring is of the Cl-SO{sub 4} type, 64.5 degrees C hot and neutral, and arises from the depth where water of meteoric origin is heated by heat conduction. The heat source is supposedly the magma reservoir whose eruption once formed Mount Unabetsu etc. (NEDO)

  6. Achievement report for fiscal 2000 on investigations and researches on promotion of utilization of waste energies that can deal with environmental load suppression; 2000 nendo kankyo fuka yokusei taio haikibutsu energy riyo sokushin chosa kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    This paper describes the achievements in fiscal 2000 in investigating generation mechanisms and suppression of dioxins from refuse incinerators, and in investigating non-bromine flame retardant materials (having a possibility of generating hazardous material such as bromine-based dioxin during combustion). To produce poly-chlorinated dibenzo-para-dioxins (PCDDs)/PC dibenzo furans (PCDFs) (dioxins, but not containing Co-PCB) in a small fluidized bed combustor for simulated refuse derived fuel (RDF), both of chlorine source and hydrocarbon are required. If the primary combustion furnace temperature is high and the air excess rate is low, the concentration of the dioxins increase. In addition, since oxygen shortage in temporal and spatial locals or excessive concentration zone of unburned hydrocarbons imposes great effect, promotion of turbulence mixing is important. In producing dioxins, vaporization from dust due to interference with the combustion gas, and copper and iron catalysts have great effect, whereas SOx in the combustion gas has suppression effect. Flame retardant materials can provide specific flame retardation effect to particular plastics in a temperature zone slightly lower than the combustion temperature. The paper also describes development of new flame retardant materials. (NEDO)

  7. FY 1998 Geothermal development promotion study. Report on results of the elastic wave exploitation (reflection method) in No.B-6, Tsujinodake area; 1998 nendo chinetsu kaihatsu sokushin chosa. Danseiha tansa (hanshaho) hokokusho (No.B-6 Tsujinodake chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The elastic wave exploitation (reflection method) was conducted to elucidate the geothermal reservoirs, estimated to exist on the Ata caldera walls in the Tsujino area, Kagoshima Pref. The elastic wave exploitation used large-size vibrators as the vibration sources and 4 courses of traverse (total length: 6.56 km, number of vibration-receiving points: 332, and number of vibration source points: 102). The data were processed by the standard procedure of the common reflection synthesis method. The geological structures were analyzed by comparing the existing geological data with the data obtained at the drilling. The analysis results suggest that the Ata caldera walls considered to exist in the surveyed area possibly correspond to the vicinity of the default existing at the south-east boundary of the collapse structure. The analysis of the geothermal structures suggest that the sheet-shaped intruding rocks, considered to exist at a depth of around 1,000 m in the vicinity of the Kaimon hot spring resort, was possibly formed by the magma ascending along the default. The presence of the magma reservoirs deep below the area is strongly suggested to work as the heat source for the area. (NEDO)

  8. FY 1997 report on the data processing of the geothermal development promotion survey. Primary. No.B-5 Mt. Musadake area; 1997 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. No. B-5 Musadake chiiki (Dai 1 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    As part of the geothermal development promotion survey, the comprehensive analysis was made on the survey of the existence amount of geothermal resource in the Mt. Musadake area, Shibetsu county, Hokkaido, which was conducted in FY 1997. In the surface survey, the following were carried out: survey of geology/alteration zone, age determination of rocks, alteration age determination by thermoluminescence method, geochemical survey (hot spring gas, hot spring water), gravity exploration and electromagnetic exploration. In the survey of environmental effects, survey of flora/fauna and survey of hot spring variations were made. The results of the analysis were outlined as follows. The geothermal system in this area seems to be controlled by the Mt. Musadake - Mt. Shitabanupuri fault, folding zone along the fault and Graben-state structure extending southeast of the zone. At deep underground, the existence of the deep geothermal water forming geothermal reservoirs is presumed, and the deep geothermal water seems to be helped by the thermal conduction and volcanic effluences from the magma reservoir related to a series of volcanoes, centered on Mt. Musadake that is regarded as heat source. The geothermal water has a temperature of over 250 degrees C and a high Cl concentration. (NEDO)

  9. FY 1998 report on the data processing of the geothermal development promotion survey. Secondary. No.B-5 Mt. Musadake area; 1998 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. No. B-5 Musadake chiiki (Dai 2 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    As part of the geothermal development promotion survey, the comprehensive analysis was made on the survey of the existence amount of geothermal resource in the Mt. Musadake area, Shibetsu county, Hokkaido, which was conducted in FY 1997 and FY 1998. In the surface survey, the following were carried out: survey of geology/alteration zone, geochemical survey, gravity exploration, wide-area gravity/magnetic structure analysis, seismic exploration, etc. In the well exploration, structural boreholes N10-MD-1 and N10-MD-2 were drilled, and the following were conducted: temperature logging/temperature recovery test, electric logging, water injection test and survey of core cuttings. For borehole N10-MD-2, the survey of geothermal water was made. In the survey of environmental effects, survey of flora/fauna and survey of hot spring variations were conducted. The results of the analysis were outlined as follows. At deep underground, the existence of the deep geothermal water forming geothermal reservoirs is presumed, and the deep geothermal water seems to be helped by the thermal conduction from the magma reservoir related to a series of volcanoes, centered on Mt. Musadake that is regarded as heat source. The geothermal water has a temperature of over 250 degrees C and a high Cl concentration. (NEDO)

  10. Research report for fiscal 1998. Research for 'New Earth 21' project implementation program preparation; 1998 nendo chosa hokokusho. 'Chikyu saisei keikaku' no jisshi keikaku sakusei ni kansuru chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    For the establishment of a CO2 measures introduction scenario which the world would accept, the latest information was collected, the DNE21 (Dynamic New Earth 21) model was improved, and simulation was reviewed. In fiscal 1998, simulation was performed for each district using an LDNE21 (Linear Dynamic New Earth 21) model, and an energy flow chart, energy balance table, and trade table were prepared and subjected to detailed deliberation. Studied were also conducted about the changes to occur in methanol production when the natural gas reserves and plant cost data were given different values. In the DNE21 model, the 'macro economy model' and 'warming damage function' were integrated, and simulation was performed for verification. Using a standard model compatible with COP3 (Third Session of the Conference of the Parties to the United Nations Framework Convention on Climate Change), comparison was made between a case in which different CO2 emission constraints were imposed on the advanced area and developing area separately and a case in which one and the same constraint was imposed on the world as a whole, and calculations were made about CDM (Clean Development Mechanism). (NEDO)

  11. Fiscal 1998 international research cooperation project. Feasibility study report on excavation of international joint research seeds; 1998 nendo kokusai kyoryoku jigyo seika hokokusho. Kokusai kyodo kenkyu seeds hakkutsu no tame no FS chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Feasibility study (FS) was made on excavation of international joint research seeds for developed countries. As FS themes, 6 themes were selected among applied 11 ones. China was interested in the joint research on improvement of a cetane number by ring-opening of LCO from fluid catalytic crackers through hydrogenation for Arabian crude oil, although China has an experience for domestic one. Since France and the USA are in the early developmental stage of practical atmospheric temperature and pressure conversion technology of lower hydrocarbon after the basic research stage, study was made on the possibility of a joint research. The other themes are as follows: Oil resource and energy conservation technology by recycling general plastics and industrial synthetic resins, advanced solid catalyst regulating technology by physicochemical technique and its application to next-generation oil refining processes, structure analysis of asphaltene and reaction mechanism analysis of heavy oil by computer simulation, and production technology of ultra-precisely controlled catalytic materials. (NEDO)

  12. Achievement reports on joint research of solar energy power generation field test project in fiscal 1997. Part 1 of 3; 1997 nendo taiyoko hatsuden field test jigyo kyodo kenkyu seika hokokusho 1/3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-01

    This report is a collection of 101 achievement reports on joint research of solar energy power generation field test project. The contents of the achievement reports are the results and generalization of the joint research with respect to the solar energy power generation field test project. As regards the locations of executing the joint research, the locations by areas and applications are stated. By areas, the joint research was carried out on gymnasiums, parks, recreation centers in the standard areas, universities, sports facilities, public halls, agricultural associations, aged persons' homes, primary, middle and high schools, prefectural office buildings and industrial technology centers in cold districts; prefectural office buildings, agricultural associations, universities, museums, industrial technology centers in good insolation districts; museums, primary, middle and high schools, parks in strong wind and salt polluted districts; and universities and police stations in snowy districts. By applications, the joint research was performed on life cooperative halls, factories, nursery schools, hospitals, clinics, local newspaper companies, indoor warm-water swimming pools, and mushroom fields. (NEDO)

  13. Achievement reports on joint research of solar energy power generation field test project in fiscal 1997. Part 2 of 3; 1997 nendo taiyoko hatsuden field test jigyo kyodo kenkyu seika hokokusho 2/3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-01

    This report is a collection of 26 achievement reports on joint research of a solar energy power generation field test project. The major contents of the achievement reports relate to the solar energy power generation field test project (summarized as manufacture and installation of solar energy power generation systems, summary of solar energy power generation facilities, peripheral devices, and daily schedule of the construction). The reports describe achievements of the joint research (names and achievements of the joint research, study presentation, lectures, literatures, status of patents, similar research in and cooperation with other research institutions), generalization of the research, and future problems. Locations of the joint research carried out are libraries, kindergartens, health and welfare centers, children's culture centers, general traffic centers, primary and middle schools, river water purifying facilities, credit banks, manufactories, retail shops at car parking areas, office buildings, hospitals, joint prefectural office buildings, municipal health centers, and prefectural general power generation control stations. (NEDO)

  14. Report on surveys in fiscal 1998 on the project to invite petroleum substituting energy related experts in Japan and EU; Nichi EU sekiyu daitai energy kanren senmonka shohei jigyo 1998 nendo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In relation with coping with global environmental problems in recent years, needs are increasing more than ever for enhancing fossil energy utilization rates, developing and expanding utilization of petroleum substituting energies that can substitute fossil energies. Since Japan is particularly a large energy consuming country, and cannot escape from depending on import for the majority of its energy resources, it is an urgent issue to enhance the energy utilization efficiency and further promote development and utilization of new energies. To do this, it is indispensable to exchange such item of information as identification of actual status in other countries of handling the petroleum substituting energies. Taking up geothermal energy, fiscal 1998 invited four experts from EU countries. Visits were made for about two weeks on Japanese research institutes and business enterprises related to geothermal energy, and opinions and information were exchanged. A seminar was held on the final day, where the EU experts have made presentations on the current status and future prospects on geothermal research and development in EU. Greatly valuable suggestions were given for the Japan's future geothermal research and development. (NEDO)

  15. Fiscal 1996 achievement report. Development of liquid fuel conversion technology (Feasibility study project on liquid fuel conversion); 1996 nendo ekitai nenryo tenkan gijutsu kaihatsu seika hokokusho. Ekitai nenryo tenkan kanosei chosa nado jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This article comprises Part 1 on 'surveys of gas fields fit for a new methanol manufacturing process' and Part 2 'reports on overseas surveys of gas fields fit for a new methanol manufacturing process.' In Part 1, surveys are conducted on the existence, exploitation, and the actual utilization of natural gas resources, and on the status of natural gas industry related infrastructures in the Middle East. Proved natural gas reserves in Iran were 742tcf (trillion cubic feet) as of 1996-end, which was the largest in the world next to Russia. As for Kuwaiti natural gas resources, they all accompany oil production, with the proved reserves marking 52.4tcf as of 1996-end or the smallest in the Middle East. In Egypt, there were proved reserves of 20.4tcf as of 1996-end, and further existence of 30-40tcf is predicted. Proved reserves in Yemen are approximately 15tcf. Proved reserves in Oman were 30tcf as of 1996-end. It is expected that there will be a 1.4% increase in the demand for methanol for automobiles. The annual demand for methanol for power generation is 720,000 tons. In Part 2, on-site surveys of infrastructures and the like indispensable for methanol plant installation are reported. (NEDO)

  16. Fiscal 1996 achievement report. Development of liquid fuel conversion technology (Feasibility study project on liquid fuel conversion); 1996 nendo ekitai nenryo tenkan gijutsu kaihatsu seika hokokusho. Ekitai nenryo tenkan kanosei chosa nado jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This article comprises Part 1 on 'surveys of gas fields fit for a new methanol manufacturing process' and Part 2 'reports on overseas surveys of gas fields fit for a new methanol manufacturing process.' In Part 1, surveys are conducted on the existence, exploitation, and the actual utilization of natural gas resources, and on the status of natural gas industry related infrastructures in the Middle East. Proved natural gas reserves in Iran were 742tcf (trillion cubic feet) as of 1996-end, which was the largest in the world next to Russia. As for Kuwaiti natural gas resources, they all accompany oil production, with the proved reserves marking 52.4tcf as of 1996-end or the smallest in the Middle East. In Egypt, there were proved reserves of 20.4tcf as of 1996-end, and further existence of 30-40tcf is predicted. Proved reserves in Yemen are approximately 15tcf. Proved reserves in Oman were 30tcf as of 1996-end. It is expected that there will be a 1.4% increase in the demand for methanol for automobiles. The annual demand for methanol for power generation is 720,000 tons. In Part 2, on-site surveys of infrastructures and the like indispensable for methanol plant installation are reported. (NEDO)

  17. Achievement reports on joint research of solar energy power generation field test project in fiscal 1997. Part 1 of 3; 1997 nendo taiyoko hatsuden field test jigyo kyodo kenkyu seika hokokusho 1/3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-01

    This report is a collection of 101 achievement reports on joint research of solar energy power generation field test project. The contents of the achievement reports are the results and generalization of the joint research with respect to the solar energy power generation field test project. As regards the locations of executing the joint research, the locations by areas and applications are stated. By areas, the joint research was carried out on gymnasiums, parks, recreation centers in the standard areas, universities, sports facilities, public halls, agricultural associations, aged persons' homes, primary, middle and high schools, prefectural office buildings and industrial technology centers in cold districts; prefectural office buildings, agricultural associations, universities, museums, industrial technology centers in good insolation districts; museums, primary, middle and high schools, parks in strong wind and salt polluted districts; and universities and police stations in snowy districts. By applications, the joint research was performed on life cooperative halls, factories, nursery schools, hospitals, clinics, local newspaper companies, indoor warm-water swimming pools, and mushroom fields. (NEDO)

  18. FY 2000 Project of developing international standards for supporting new industries. 'Standardization of multicolor measurement'; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Multicolor no sokushoku no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Described herein are the FY 2000 results of the study on and research and development of the testing methods for tones of anisotropic color materials (multi-colors) for proposing the international standard. USA has proposed the triangle colorimetry, based on the results of the visual tests with metallic paints, which is being incorporated in the ASTM standards. Germany seems to adopt the multi-angle colorimetery in the DIN standards. The FY 2000 efforts are directed to measurement of the reflection characteristics of the metallic and pearl-mica samples by a variable-angle spectrophotometer. The solid color and metallic color are being evaluated by a weather resistance tester QUV and outdoor tests, because of the anticipated different mechanisms by which they are aged. The functional test and analysis are also required to correlate the multi-color measurement results with visual evaluation results, and the preliminary tests are conducted to improve skill of the panelists. (NEDO)

  19. Wind power development field test project at Ebetsu plant of Oji Paper Co., Ltd. Close survey on wind conditions; Oji seishi Ebetsu kojo ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A survey was made on wind conditions at the Ebetsu plant of Oji Paper Co., Ltd., on the assumption that a demonstrative equipment of a wind power generation system was installed in the plant. The survey period was one year from Oct., 1998 to Sept., 1999. The observations were carried out on the average wind velocity, average wind direction, standard deviation of velocity, and the maximum instantaneous wind velocity. With a fixed point observation at 20 m above ground, and with the minimum observation time unit of 10 minutes, an average value during the 10 minutes was determined as the measurement of each category. However, the maximum instantaneous wind velocity was determined on the measurement with the minimum observation time unit of 2 seconds. The average wind velocity was 3.2 m/s, the maximum wind velocity during the period was 34 m/s, and the prevailing wind direction was SSE (25.6%), while the total occurrence probability on the wind axis with NW-SE as the main axis was 62.9%. The intensity of turbulence was 0.28 at a wind velocity of 2.0 m/s or above and was 0.25 at 4.0 m/s or above. An estimated annual operation rate of a windmill was 37-59% using the rated value of a 150 kW, 300 kW and 750 kW class windmills. (NEDO)

  20. Basic investigation on promotion of joint implementation in fiscal 2000. Project for modification of Pridneprovskaya power plant in Ukraine; 2000 nendo kyodo jisshi nado kiso chosa hokokusho. Ukraine Pridneprovskaya hatsudensho kaishu jigyo keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With objectives of saving energy and reducing greenhouse gas emission at the Pridneprovskaya power plant in Ukraine, a scrap and build project has been discussed. This project will abolish the unit No.12 among the eight units in the existing coal burning power generation facilities, and install a natural gas burning combined cycle plant comprising of three units each with an output of 100 MW. The new plant facilities will consist of gas turbines, steam turbines, HRSG and auxiliary devices, and an air-cooled synchronous power generator with a capacity of 119 MVA. Use of natural gas as fuel reduces generation of soot, sulfur oxides, nitrogen oxides, and CO. In addition, the hot effluent and waste liquor effluent will decrease from those at the present plant. The required fund will be 30,107 million yen. The energy saving effect of this project is reduction of about 7.5 million tons of crude oil equivalent as a total in 40 years. The greenhouse effect gas will decrease by about 39 million tons as a total in 40 years. The profitability estimation calls for the number of investment recovery year of 16 years, and internal profit rate of 7.32%, wherein the implementation of the project cannot be expected as a project to be carried out by private funds. (NEDO)

  1. Achievement reports on joint research of solar energy power generation field test project in fiscal 1997. Part 3 of 3; 1997 nendo taiyoko hatsuden field test jigyo kyodo kenkyu seika hokokusho 3/3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-01

    This report is a collection of 40 achievement reports on joint research of a solar energy power generation field test project. The major contents of the achievement reports relate to the solar energy power generation field test project (summarized as manufacture and installation of solar energy power generation systems, summary of solar energy power generation facilities, status of installation of solar cells, peripheral devices, and daily schedule of the construction). The reports describe achievements of the joint research (names and achievements of the joint research, study presentation, lectures, literatures, status of patents, similar research in and cooperation with other research institutions), generalization of the research, and future problems. Locations of the joint research carried out are hospitals, township hospitals, a science hall for youths, study and educational cities, primary schools, middle schools, high schools, universities, senior health centers, a life cooperative association, retails shops, factories, office buildings, joint governmental office buildings, Shinkansen stations, prefectural industrial testing centers, health and welfare centers, FM broadcasting studios, a town operated hall of technologies, prefectural office buildings and training centers. (NEDO)

  2. FY 2000 report on the survey project on the policy for international energy utilization rationalization, etc. - model project on the heightening of international energy consumption efficiency. Viability survey of the project on energy conservation in the urea synthesis process in India; 2000 nendo kokusai energy shiyo gorika nado taisaku jigyo - kokusai energy shohi koritsuka nado model jigyo chosa hokokusho. Indo ni okeru nyoso gosei process sho energy jigyo jisshi kanosei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of conserving energy and reducing greenhouse effect gas, a remodeling project was studied of urea plants constructed from the 1960s to the 1970s. Conditions for being companies for study are as follows: company has a production scale of more than 0.2 million t/y, adopts the complete circulation method, and will continue operation. And, Duncans Industries Ltd. (DIL) was selected. DIL owns the ammonia plant of 3 series x 400 t/d and the urea plant of 3 series x 682 t/d. In the modeling, stripper and carbamate condenser are added to the existing reactor as the main equipment. As a result of the study, the energy conservation effect was 13,667 toe/y, and the amount of reduction in greenhouse effect gas was 42,289 t-CO2/y. The total amount of this project was roughly estimated at 1.517 billion yen. By carrying out the project, the urea production cost is reduced approximately $9/t, but the project becomes unprofitable if the urea price is based on $188.1/t. (NEDO)

  3. Fiscal 1998 research report (continued from the fiscal 1997 project). International survey project for rational energy use / Basic survey on efficient energy use in developing countries (Database construction project) / Survey on Japanese energy conservation technologies; 1998 nendo (1997 nendo jigyo kurikoshi) kokusai energy shiyo gorika nado chosa jigyo hatten tojokoku energy shohi koritsuka kiso chosa (database kochiku jigyo) chosa hokokusho. Nippon no sho energy gijutsu ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    As a part of development of the energy conservation technology database, revision was made on 'Directory of Energy Conservation Technology in Japan' which was published to present the energy conservation technology of the Japanese energy-intensive industry to Asian countries in fiscal 1996. The previous directory was composed of 307 technical items, and 126 items among them were deleted and new 63 items were added through this revision. The technologies with energy conservation effects more than 10% were mainly selected by knowledge of the industrial members of the committee and other specialists. The energy conservation effect widely ranges from low-level one to high-level one, and the number of all the energy conservation technologies is enormous. Consequently, it should be considered that the applicable extent of the energy conservation technologies is dependent on the energy cost or economical situation of Japan and developing countries. (NEDO)

  4. FY 2000 report on the survey for introduction of the hot spring effect prediction method in the geothermal development promotion survey. Improvement of the hot spring effect prediction method in the geothermal development promotion survey; 2000 nendo chinetsu kaihatsu sokushin chosa. Onsen eikyo yosoku shuho donyu chosa - Chinetsu kaihatsu sokushin chosa ni okeru onsen eikyo yosoku shuho no kairyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Supposing the case where the geothermal development promotion survey was carried out in promising geothermal areas in Japan, investigational study was conducted on possibilities of introducing the hot spring effect prediction method, improvement of the method, etc. In the survey, adjustment/classification of formation mechanisms of hot spring were made. For each of the formation mechanisms, the mechanisms in case of the geothermal development having effects were studied/summarized. As to how effects are brought about, presumed were the lowering of water level and decrease in discharge amount in accordance with the decreasing pressure and the dilution by increase in mixture of the ground water around the area. Also cited were the vaporization of hot spring aquifers by the increasing rate of vapor inflow, etc. For the introduction of the hot spring effect prediction method to the geothermal development promotion survey, the problem is short supply of various data, and the examination for it was made. Based on the results of the survey, items to be studied in case of introducing the hot spring effect prediction method were selected. Further, the hot spring effect prediction flow in case of introducing surface survey and well survey was made out. (NEDO)

  5. FY 1998 annual report on the project of basic survey for improving energy consumption efficiency in developing countries / invitation of engineer trainees from developing countries (Indonesia, the Philippines, Vietnam and Myanmar); Hatten tojokoku energy shohi koritsuka kiso chosa nado jigyo / hatten tojokoku gijutsusha shohei jigyo 1998 nendo chosa hokokusho (Indonesia, Philippines, Vietnam, Myanmar)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    NEDO is positively implementing the training programs, in view of importance of training experts on (energy-saving and environmental conservation technologies), by inviting administrators and engineers from developing countries to educate them with Japan's pollution preventive techniques, administration procedures, energy-saving measures, and so on. In FY 1998, NEDO commissioned the International Center for Environment Technology Transfer to train administrators and engineers from Indonesia, the Philippines, Vietnam and Myanmar. This paper describes the proposals, based on the collected answers of the trainees to the questionnaires. The trainees were interested in all themes. About 40% of the trainees considered that the training period was short. Some trainees hoped the training course was held in summer. Difference in industrialization is reflected in difference in recognition and urgency of the environmental problems. Training was conducted by English and Vietnamese, but could be done without translators of Vietnamese. Preparation for the invitation needs a lot of works, and the course should be explained more thoroughly beforehand. It is regrettable that one trainee from Indonesia was late for the course. (NEDO)

  6. FY 1998 annual summary report on project for international energy consumption rationalization. Survey on analysis tool for improving efficiency of Asian energy consumption (data book 2 for 1985); 1998 nendo kokusai energy shiyo gorika nado taisaku jigyo chosa hokokusho. Asia energy shohi koritsuka bunseki tool chosa jigyo (shiryoshu 2 1985 nen data)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The data book is compiled, based on common industrial classifications, as the tool for analyzing, e.g., the mutual ripple effects of economic growth and increased efficiency of energy consumption throughout the Asia-Pacific region. This book summarizes the industrial-related and energy-related tables for 8 Asian countries and Japan. The book II is for the 1985 data (1987 data for China), comparing with the book I for the 1990 data. The industry-related tables are composed of the tables for transaction bases, input coefficients, final demand converters, importation coefficients, inverse matrices, sensitivity/influence coefficients, production inducement levels, production inducement coefficients, degrees of dependence on production inducement, importation inducement levels, importation inducement coefficients, and degrees of dependence on importation inducement. Energy-related tables are composed of the tables for, e.g., energy input, energy consumption, emissions, and CO2 emissions. (NEDO)

  7. FY 2000 report on the promotion projects by Research Institute of Innovative Technology for the Earth. Proceedings of the international seminar (Reports on photosynthetic CO2-assimilating enzymes by the international workshops); 2000 nendo chikyu kankyo sangyo gijutsu kaihatsu suishin jigyo kokusai seminar jigyo shiryo. Kogosei CO2 kotei koso kokusai workshop hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Described herein are the reports on photosynthetic CO2-assimilating enzymes, presented to the international symposium. These enzymes are important for assimilating CO2 in air, maintaining the environments and production of foods. For genes and proteins, the topics include diversification and function evolution of the RuBisCO (ribulose 1,5-bisphosphate carboxylase/oxygenase) in the natural environments, in particular in microorganisms. For activity regulation of PEPC, the topics include three-dimensional structures of PEPC and phosphorylation mechanisms and activity regulation therefor. For activity regulation of RuBisCO, the topics include post-translational activity of the enzymes (e.g., methylated enzyme); molecular regulation mechanisms involved in the biosynthesis and decomposition of RuBisCO; and activity regulation mechanisms in the chloroplast. For leaf photosynthesis and RuBisCO, the topics include importance of enzymes and involved in-vivo reaction steps for leaf photosynthesis CO2 assimilation reactions. For function of PEPC, the topics include the biochemically and molecular biologically necessary and sufficient conditions for the C4 mechanism as the special photosynthesis mechanism. For transgenic approaches, the topics include procedure for allowing the RuBisCO gene of a dissimilar organism to function in the tobacco chloroplast, and introduction of enzymes involved in the C4 photosynthesis pathway in C3 plants. (NEDO)

  8. Fiscal 1998 intellectual infrastructure project utilizing civil sector functions. Research and development project on prompt-effect type intellectual infrastructure creation (Basic study of measurement of human characteristics); 1998 nendo minkan no kino wo katsuyoshita chiteki kiban jigyo seika hokokusho. Sokkogata chiteki kiban sosei kenkyu kaihatsu jigyo (Ningen tokusei keisoku ni kansuru kiban kenkyu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the development of working conditions fit for aged people and devices for them to operate, their visual function and behavioral characteristics are measured and analyzed. In the study of visual functions, 50 people from local cities and regions and another 50 from Osaka and its neighboring cities are subjected to measurement regarding visual acuity required in daily life, color discrimination, dark adaptation, glare, and the like. In the study of performing characteristics, 500 people are subjected to measurement regarding the scope of movement of upper limbs, their reach, and skillfulness with which the people can move fingers. When brightness, luminance, and contrast are caused to change relative to letters and background, aging is found to exert a great influence on the ease of reading, dark adaptation, and glare. As for the upper limb work range and reachability and the skillfulness in finger movement, it is found that aging narrows down the tolerant work area, lowers the working pace, and greatly affects skillfulness depending on the device operating method, all these disclosing actualities of difference attributable to age and sex. Concerning the device operating position and the ease of device operating force application, new measuring and evaluating methods are worked out, and correlations between the contents of operation and the operating position are seized. (NEDO)

  9. Research report of FY 1997 on the environmentally acceptable coal utilization system introduction support project. Follow-up project on circulating fluidized bed boiler introduction (Calaca Batangas Thermal Power Station); 1997 nendo chosa hokokusho. Kankyo chowagata sekitan riyo system donyu shien jigyo (junkan ryudosho boiler ni kakawaru follow up jigyo (Calaca Batangas karyoku hatsudensho))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    For the follow-up project, to promote the diffusion of results of the clean coal technology (CCT) model projects, experts of circulating fluidized bed boilers were dispatched, to guide and advise for the operation of facilities introduced in these projects. The purpose of these projects is to diffuse the CCTs, and to support the promotion of environmental measures. Some guidance and advice about operation processes, data processing, operation regulation, maintenance, and boiler maintenance works were provided to the Ministry of Energy and Electric Power Corporation of the Philippines. Semirara, Malangas, and Samar coals in the Philippines were used for the tests. The boiler facilities could be operated by Philippine operators themselves. Based on the guidance and advice about operation processes, combustion tests using various Philippine coals were also planned and conducted by themselves. The maintenance techniques were transferred to Philippine operators through the inspection, repair and advice. The Philippine side understood the technologies well, and the circulating fluidized bed boiler technology was independently educated in the Philippines. 23 figs., 16 tabs.

  10. FY 1999 report on the geothermal development promotion survey - Akinomiya area survey. Temperature/pressure logging before the long-term jetting test; 1999 nendo chinetsu kaihatsu sokushin chosa Akinomiya chiiki chosa hokokusho. Choki funshutsu shikenmae no ondo atsuryoku kenso

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-06-01

    As a part of the FY 1999 geothermal development promotion survey - Akinomiya area survey, the rising speed/vertical permeability of the fluid associated with the natural flow were calculated by grasping the temperature of geologic layers/reservoir pressure in the survey area and the temperature distribution for vertical depth. In the survey of boreholes in the Akinomiya area: N9-AY-3, N10-AY-6, N10-AY-7, N10-AY-8, temperature/pressure logging was conducted in the stationary state at the time when a lot of time passed after drilling, water-filling test and jetting test having been finished. In the temperature/pressure logging, the continued measurement was made using PTS logging device to simultaneously measure temperature/pressure/impeller revolution number and lowering measuring device. As a result of the survey, it was assumed that there is a possibility of occurrence of the borehole fluid flow around the depth of 980-1290m and 1320-1540m of N9-AY-3 and around the depth of 880-1090m of N10-AY-8. The rising speed and permeability of fluid from each well indicated the same order at three wells. (NEDO)

  11. Investigation of geothermal development and promotion for fiscal 1997. Fluid geochemical investigation (hot-spring gas) report (No. B-5 Musadake area); 1997 nendo chinetsu kaihatus sokushin chosa. Ryutai chikagaku chosa (onsen gas) hokokusho (No.B-5 Musadake chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This investigation elucidated the possible existence of geothermal reservoir layer in the subject area by studying and analyzing the hot-spring gasses of Musadake. The Musadake area is the one extending over Shibetu-cho and Nakashibetu-cho, Shibetu district, Hokkaido. The sampling of the hot-spring gasses was carried out at three natural gusher sites and one hot spring well site. The gasses in the Kawakita hot spring is most affected by volcanic gasses. The origin of the volcanic gasses is a magmatic gas of andesite nature the {sup 3}He/{sup 4}He ratio of which is 8X10{sup -6} or about. As a result of the analysis, the hot-spring water is Na-Cl type, high salt concentrated, and 200 degrees C in temperature; from the result of a gas geochemical thermometer, it is estimated to be not less than 250 degrees C. In the tectonic viewpoint, the depth hot water is derived from the meteorite water that flows in through a bent zone incident to the Musadake-Shitabanupuri mountain fault and from the fossil sea water that exists in the underground depth; the depth hot water is formed by conduction heat from a magma reservoir that formed Musadake and by volcanic ejecta. This depth hot water rises along Kawakita south, Urappu River fault, etc., mixing with the meteorite water and forming the shallow reservoir layer. (NEDO)

  12. FY 1999 report on the results of the joint study - project on the public facility use photovoltaic power generation field test; 1999 nendo kokyo shisetsunadoyo taiyoko hatsuden field test jigyo kyodo kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    In the field test, solar cell panels were installed on rooftop, and inverters were installed indoors. The electric power generated was connected at high pressure with electric installation of facilities and was also supplied to power equipment, lighting, air conditioning, etc. in facilities. The FY 1999 results were summarized. The installation of photovoltaic power generation facilities at 137 places and the results of the study were summarized in this report including a new university co-op building, Tokyo Metropolitan Advanced Technology Education Center, Suwano Center House of Fukushima prefecture, Environment Center of Saga prefecture, Educational Foundation Utsukushino Kindergarten, Hikarigaoka Park of Yamagata prefecture, Koiwai factory of Koiwai Dairy Products Co., Social Welfare Corporation Kameyama Ayumi Nursery School, etc. (NEDO)

  13. Survey report on project for drawing district energy-saving visions for Town of Aizu Wakamatsu. Preliminary survey; 2000 nendo Aizu Wakamatsu shi chiiki sho energy vision sakutei nado jigyo (shoki dankai chosa) chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The feasibility study is conducted for introduction of the district energy-saving measures in City of Aizu Wakamatsu, for which the actual situations of energy consumption and promising energy-saving measures are surveyed. The city has a typical basinal weather, cold in winter and very hot and humid in summer, and tends to have a longer air-condition period in a year. It is considered that there are many wasteful energy consumption items to be studied for reduction. In the area of moving means, dependence on public transportation systems is considered to be relatively low, suggesting that there are much space of reducing transportation energy by the measures such as self-imposed control on use of private cars, promotion of utilizing public transportation systems and fuel-saving type driving throughout the city. The promising energy-saving measures studied to verify the effects include introduction of PVM analyzers for establishing better cost/effect relationship between power consumed by air-conditioners and pleasantness; introduction of garbage power generation, co-generation and high-efficiency illuminators; improvement of power-factor; and demand control for air conditioning, rationalization of power-receiving facilities, introduction of systems for saving flushing water and improvement of air conditioners' outdoor facilities. (NEDO)

  14. Survey report for fiscal 1999. Reference book for standard heat calculations in high-performance industrial furnace introduction field test project; 1999 nendo koseino kogyoro donyu field test jigyo chosa hokokusho. Hyojun netsu keisanshiki kijunsho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    With an objective to verify in a short time the heat recovery capability being the evaluation parameter for the technologies to develop the high-performance industrial furnace, a standard calculation book will be prepared, which standardizes the data collection methods and heat calculation methods, and is used as the standard data sheets and bases. Evaluations and analyses will be given on business types, furnace constructions, thermal technologies, and functions in the research items adopted in the field test project. The results will be used to recognize the business entities engaged in the project in the next fiscal year, furnace types and sizes, establish the industrial furnace subjected to researches in the next fiscal year, and proliferate and expand the related business entities. Standard data sheets will be prepared on seven kinds of furnaces, heating furnaces (continuous and batch types), ladles, heat treatment furnaces (continuous and batch types), gas treatment furnaces, and melting furnaces. The standard data sheets will cover the following items: evaluation parameters (energy saving rate, thermal efficiency, and waste heat recovery rate), calculating conditions to be the base for the evaluation parameters, a heat production book to be the base for calculating the heat unit requirement, and a standard calculation book to be the base for the heat production table. The standard data sheets (including the standard calculation book) and floppy disks are submitted. (NEDO)

  15. Model project for reduction of electric power consumption in cement plant. Report for fiscal 1999 on achievements of commissioned operation; Cement shosei plant denryoku shohi sakugen model jigyo 1999 nendo itaku gyomu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With objectives of utilizing energies efficiently and serving for environmental improvements, a model project was implemented for reduction of electric power consumption in cement plant in Vietnam. This paper reports the achievements in fiscal 1999. This project is intended to install waste heat boilers in waste gas lines in the preheating process in the cement plant, whose waste heat is recovered by steam to generate electric power by using steam turbines. The current fiscal year has executed the following activities: design of turbines, condensers, and oil units; discussions on the arrangement drawings thereof obtained from the Vietnam side; design of piping and provision of the detailed drawings thereof to the Vietnam side; planning of the electric cable routes; planning of instrumentation wiring routes; and grounding and interlocks. Results of the discussions on the proposed plant operation methods were reflected to the system design of the monitoring devices. Furthermore, the turbines were fabricated, and the associated facilities, valves, and piping materials were procured based on the detailed design. The piping materials were given pre-shipment inspections before having been transported to the site. (NEDO)

  16. New energy vision for Ginoza village. Fiscal 2000 survey report on new energy vision formulation project for Ginoza village; Ginozason shin energy vision. 2000 nendo Ginozason shin energy vision sakutei nado jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    A new energy vision has been formulated for Ginoza village, Okinawa Prefecture, for the realization of symbiosis with nature. It is a 5,000-strong entirely farming village situated along the eastern coast at the middle of the main island of the Ryukyus, with energy consumption of 9,982 kl in terms of crude oil in fiscal 1999. The results of activities in this connection are summarized in six chapters, which are (1) the state of the village and new energy, (2) current state of energy supply/demand and outlook for the future, (3) existing amount of new energy, (4) trends of types of new energy under study, (5) feasibility of new energy introduction, and (6) Ginoza village's new energy vision. Chapter (6) is constituted of the general principles of new energy introduction into Ginoza village and a long-term vision of new energy introduction for each field, and discusses the introducible types which are photovoltaic power generation, wind power generation, small scale hybrid power source systems, fuel cells, natural gas fired cogeneration, refuse fueled power generation, and clean energy vehicles. (NEDO)

  17. Fiscal 1997 international cooperation project. Report on the results of the research on environmental harmony type combustion technology; 1997 nendo kokusai kenkyu kyoryoku jigyo. Kankyo chowagata nensho gijutsu ni kansuru kenkyu kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Out of the R and D on the environmental harmony type combustion technology, the results of the project carried out in fiscal 1997 were summed up. In the site survey, etc., visits were paid to France, Spain, Greek, Germany, the U.K. and the U.S. to have discussions and examine the trend of research on the NOx removal catalyst and catalyst combustion. In the actual R and D, the R and D were conducted on zeolite base NOx removal catalyst, oxide composite base NOx removal catalyst, alumina base NOx removal catalyst, direct decomposition type NOx removal catalyst, catalyst combustion, etc. In the R and D of the catalyst combustion, durability under high gas flow flux was examined of PdO-Pt/Ba-Al203 catalyst developed for low temperature use, which indicated that durability and low temperature activity were heightened. As high temperature use catalyst, high temperature durability was examined of the developed Pd0-La/Gd-ZrO2 catalyst, which showed that the durability was favorable. 322 refs., 261 figs., 55 tabs.

  18. Fiscal 1998 overseas geological structure survey report on the engineer interchange project (coal mine technology field), Indonesia; 1998 nendo kaigai chishitsu kozo nado chosa gijutsusha koryu jigyo (tanko gijutsu bun'ya), Indonesia hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This project aims at improvement of coal mining technology and productivity in Indonesia by Japanese production control technology and business management technology for underground coal mining, through interchange of coal engineers between Japan and Indonesia. This project is composed of the short- term and long-term dispatch project of engineers to Indonesia, and the training project of Indonesian engineers in Japan. In fiscal 1998, the short-term dispatch was made for the training in Indonesia on underground coal mine development (development planning, pit mouth selection, main gallery design, mining system selection, transport planning, ventilation planning, under-river mining, mine water proofing, drainage). The long-term dispatch was made for contact and negotiation with concerned Indonesian organizations, support of the training project, and collection of information on the trend of Indonesian economy and energy, and the present and trend of the coal industry for conducting smooth and effective engineer interchange. (NEDO)

  19. Fiscal 1999 technical survey report. Model project implementation feasibility study in China on effective utilization of cement waste heat; 1999 nendo Chugoku ni okeru cement hainetsu yuko riyo model jigyo jisshi kanosei chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Although China ranks first in the world in the manufacture of cement, yet the energy consumption rate is high and there remains room for improvement. Effective utilization of energy at cement making plants will not only profit the industry but also contribute to the stabilization of energy supply for China. The model project on power generation using cement waste heat implemented at Ningguo Cement Plant was concluded successfully. For the purpose of enabling China to domestically manufacture the equipment, the installation of such equipment at Zhujiang Cement Plant and Liuzhou Cement Plant in Guangxi Zhuangzu Zizhiqu was assumed, and their locations and plant operating conditions were studied. In addition, surveys were conducted of manufacturers of important components of the power generation equipment such as boilers, steam turbines, generators, and breaker boards. Two manufacturers were visited for each of the components, and they were checked for records of manufacturing similar equipment, quality assurance and process management capabilities, and for ability to satisfy required specifications. Among the visited manufacturers were Nanjing Turbine and Electric Machinery Co., Jinan Power Equipment Factory, and Hangzhou Boiler Works. Based on the results of the surveys, it was concluded that the model project may be implemented. (NEDO)

  20. Overview of FY1997 human media technology R and D; 1997 nendo sangyo kagaku gijutsu kenkyu kaihatsu seido Shin energy Sangyo Gijutsu sogo Kaihatsu Kiko itaku jigyo. Human media no kenkyu kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This paper reports a summary of results in fiscal 1997 of research and development of human media technology. Fiscal 1997 launched design and trial fabrication of the following items: interface to improve efficiency and safety of plant operators, accommodation of multimedia contents to aid Kansei design, city development design aiding technologies using contents retrieval and presentation technologies and virtual reality, and empirical evaluation technologies for safety, comfort and convenience. Specific study assignments were extracted on a virtual media technology, a Kansei media technology and a knowledge media technology being three elementary technologies for human media to make clear the research and development approaches to be taken in the coming fiscal years. In addition, a human media technology committee, a research and development working group, and an investigation working group were established. Also launched were investigations on research trends in the human media technology, and investigative researches on contacts of information needs in industries with human media. 59 refs., 114 figs., 24 tabs.

  1. FY 2000 report on the investigation of environmental effects in the geothermal development promotion survey. Tertiary. No.B-7 Kuwanosawa area; 2000 nendo chinetsu kaihatsu sokushin chosa. Kankyo eikyo chosa hokokusho - No. B-7 Kuwanosawa chiiki (Dai 3 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-01-01

    In the Kuwanosawa area, Yuzawa city, Akita prefecture, survey was conducted to grasp effects of drilling for structural boring in the geothermal survey on the peripheral environment. In the survey of animals, there were 5 orders/10 families/19 species of mammals and 10 orders/25 families/73 species of birds. Three kinds of precious animals were confirmed. There were 132 families/6,670 species in the flora. Three kinds of precious plants and three kinds of precious floras were confirmed. During the survey, drilling for structural boring was conducted. At three spas for survey, there were recognized some survey items of which there were great fluctuations. However, those are seasonal valuations or valuations related to the situation of the inside of hot springs. It is not recognized that the fluctuations were caused by the drilling work and pumping-up of geothermal water. The noise made during the well drilling was reduced around the well as theoretical values indicated. At a spot 200m away from the well, the noise was reduced from the environmental standard, and accordingly, it seems that there are few effects on the peripheral environment. The vibration was reduced around the well more than theoretical values indicated. That was below the control level at a spot 25m away from the well, and it seems that there are few effects on the peripheral environment. (NEDO)

  2. FY 2000 report on the results of the data processing in the geothermal development promotion survey. Tertiary. No.B-7 Kuwanosawa area; 2000 nendo chinetsu kaihatsu sokushin chosa data shori hokokusho. No. B-7 Kuwanosawa chiiki (Dai 3 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-01-01

    The comprehensive analysis was conducted of various data obtained in the geothermal development promotion survey conducted in the Kuwanosawa area, Yuzawa city, Akita prefecture, from FY 1998 to FY 2000. The geology of the Kuwanosawa area consists of the Pretertiary system and Quarternary system, through which intrusive rocks are recognized. Basement rocks are composed of the Paleozoic-origin crystalline schist and the Cretaceous-period granites which intruded into the schist. In the Kuwanosawa area, there were recognized no clear geothermal signs such as the discharge of geothermal fluids like hot spring, fumarolic gas, etc., places of high temperature and new geothermal alteration zones. The geothermal water of borehole N11-KN-1 is a low temperature/low CL concentration geothermal water which was stored in basement rocks, which is supposed to be the one conductively heated in the process of the meteoric water penetrating deep-underground. The geothermal system heat source in the Kuwanosawa area and the periphery is regarded as the relic magma which spewed out the volcanic rocks of Mt. Takamatsu-dake in the Quaternary period. However, the geothermal fluid included no components originating in high temperature volcanic emissions, and therefore, it is considered that the geothermal fluid was formed by the meteoric water conductively heated by volcanic heat source. (NEDO)

  3. FY 1994 report on the survey of geothermal development promotion. Investigative construction and analysis for structural boring (No. A-1 - Haneyama area); 1994 nendo chinetsu kaihatsu sokushin chosa. Kozo shitsui chosakoji oyobi kaiseki hokokusho (No. A-1 Haneyama chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    For the contribution to elucidation of the geothermal structure in the Haneyama area, Oita Prefecture, the paper carried out the drilling of structural boring exploration wells, N6-HN-1 (1,605m) and N6-HN-2 (1,402m), and the well exploration. In the well exploration, the following were conducted: measurement of earth temperature, temperature recovery test, electrical log, simple water injection test, core/cutting observation, core test, powder X-ray diffraction analysis, physical property test, measurement of homogenization temperature of fluid inclusion, etc. In the temperature log and temperature recovery test, the terminal temperature at a 1,600m depth of N6-HN-1 well and at a 1,400m depth of N6-HN-2 well was 139.6 degrees C and 26.2 degrees C, respectively. The homogenization temperature of fluid inclusion was relatively higher, +70 degrees C to +100 degrees C, than that in the results of the temperature log, but was on the side of lower temperature, -30 degrees C to -100 degrees C, in a comparison with the saturated boiling curve of the earth surface and ground water level. Namely, it was thought that around the N6-HN-1 well, there used to exist the high temperature fluid of 250 degrees C or higher at the peak period of geothermal activities, but there only existed the geothermal water of approximately 140 degrees C at the present time. (NEDO)

  4. Fiscal 1995 survey of promotion of the geothermal development. Report on a usage feasibility test of a small scale geothermal binary cycle power generation system; 1995 nendo chinetsu kaihatsu sokushin chosa. Chusho chinetsu binary hatsuden system jissho shiken hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    In this survey, studies for popularization and practical utilization of small and medium size geothermal binary cycle power systems which assesses low and medium temperature geothermal resources were conducted, and studies for development of the system to be introduced for practical use and for promotion of the popularization were made. A study was carried out of preconditions and various conditions of a demonstrative test plant (100kW class, 500kW class) in view of the initial cost of the actual plant, and an analysis was made of the power generation cost. Acceptability of the demonstrative test plant (100kW class) was examined to analyze problems on the introduction. A thermodynamic analysis was made of the output of geothermal binary cycle power generation. Analysis/evaluation of the results of the 100kW demonstrative test plant were carried out in view of the operation results of the plant of the same kind, and checks/reviews were conducted of performance and reliability of the system, equipment simplification, etc. Inspection of the system was made in the stage of design/manufacture of the 500kW demonstrative test plant. Concerning the spread/expansion of the system, studied were multiple stage geothermal utilization and PR promotion method. 14 refs., 62 figs., 55 tabs.

  5. Report on projects of the basic survey of effective energy consumption in developing countries and the invitation of engineers of developing countries to Japan (Vietnam, the Philippine, Indonesia and Thailand) in FY 1997; 1997 nendo chosa hokokusho Hatten tojokoku energy shohi koritsuka kiso chosa to jigyo hatten tojokoku gijutsusha shohei jigyo (Vietnam, Philippines, Indonesia Tai)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Based on the significance of technological training for energy saving and environmental protection, NEDO has invited administrators and engineers of four countries in Southeast Asia. Pollution prevention technology, administrative methods and energy saving measures in Japan were lectured in the International Center for Environmental Technology Transfer. The training curriculum included (1) basic law of environment and local administration from the viewpoint of criminal law concerning history of air pollution problems and countermeasures in Yokkaichi petroleum industrial complex, (2) prospect of new energy technology development in Japan relating to the energy saving law, (3) energy saving measures, air/exhaust gas/dust treatment for environmental protection, and actual waste treatment measures by typical individual industries, and (4) significance of common management technology for individual treatment measures. Policies of energy saving and environmental protection and technology information in Japan which can be transferred were provided to two administrators of energy saving in the industry sector of Management of Science, Technology and Environment of Vietnam. 12 figs.

  6. FY 2000 report on the research cooperation project on the research cooperative follow-up for development of the manufacturing technology supported by advanced and integrated information system through cooperation; 2000 nendo kenkyu kyoryoku jigyo. 2000 nendo kan'i sosagata denshi sekkei seisan shien system no kaihatsu ni kansuru kenkyu kyoryoku follow up jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The manufacturing technology supported by advanced and integrated information system through cooperation (MATIC), that is, a project supporting the production technology including the international information system and CAD/CAM system, etc. was carried out from FY 1994 to FY 1998. From FY 1999, the follow-up project is being implemented for the spread of the MATIC results, support for the independent R and D and the technical guidance. China, Indonesia, Malaysia and Singapore participated in this project, by which the support and technical guidance were given in three fields: automobiles/the parts; household electric appliances/the parts; fiber/apparel. At present, each country is continuing its own activity for using the system developed in the MATIC project in its country. In this fiscal year, researchers were sent to each country for supporting the activities. Further, the MATIC follow-up committee was established to conduct the drawing-up of a business plan, grasp of the state of the spread/R and D, discussion about problems/subjects, comprehensive evaluation of the MATIC project, etc. (NEDO)

  7. Report on investigations in fiscal 2000 on the projects to support introduction of environment friendly coal utilization system. Green helmet project for briquette production plant - Mae Moh coal mine, Thailand; 2000 nendo kankyo chowagata sekitan riyo system donyu shien jigyo chosa hokokusho. Briquette seizo setsubi ni kakawaru green helmet jigyo (Thai koku Mae Moh tanko)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    This Green Helmet Project is intended to suppress generation of environment polluting substances in association with coal utilization in Thailand by demonstrating and improving the proliferation infrastructure for the clean coal technology to be used widely in Thailand. The project is also intended to serve for stabilized assurance of energies for Japan. The demonstration project related to briquette manufacturing facilities executed as one of the 'Projects to support introduction of environment friendly coal utilization system' is intended to manufacture at low cost a briquette which is low in odor, free of smoke, and suppressed largely of sulfur oxide generation. The briquette is made by adding clayish minerals, sulfur, a fixing agent and a binder into brown coal being a low grade coal. The project implements proliferation of the technology to reduce environmental load associated with coal utilization in developing countries according to the situation and needs of the counterpart countries. The present project has performed the site surveys and guidance of operation and maintenance techniques as follow-up works of the demonstration project having been completed by cooperation between Japan and Thailand. It is considered that what had been intended in the beginning has been achieved sufficiently. (NEDO)

  8. Report on the survey of the project on the environmentally friendly type energy community field test. Investigative project for development and commercialization of recycle technology of waste edible oil; 2001 nendo kankyo chowa gata energy community field test jigyo chosa hokokusho. Hai shokuryo yu no recycle gijutsu kaihatsu to jitsuyoka no tameno chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-06-01

    An investigative study was made of the use of waste edible oil as fuel and recycle use of residual food in the food service business. As to the existence/recovery of edible oil, it was found out that waste edible oil of 15.9g/meal per capita was discharged at multiple wide-area distributed shops and that the total amount reached 1,861kl/y in the country. Concerning the technology for using it as biodiesel fuel, Ronford Co., which has the most actual results of the technology, recovers waste edible oil in Kyoto City, refines it and uses it as fuel for the City's garbage truck. About the use of waste edible oil as boiler use fuel, there are examples in Sapporo Grand Hotel, which has been contributing to energy conservation for more than five years. In the assessment of the profitability as project, for the direct combustion for boiler fuel use, the same/large heat supply system is a prerequisite, and for the hot stove loaded type direct combustion, there is an element of the technology development. Therefore, the use as bio-diesel fuel is most expected, though there is a taxation problem. (NEDO)

  9. Report on the survey of the project on the environmentally friendly type energy community field test. Investigative project for development and commercialization of recycle technology of waste edible oil; 2001 nendo kankyo chowa gata energy community field test jigyo chosa hokokusho. Hai shokuryo yu no recycle gijutsu kaihatsu to jitsuyoka no tameno chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-06-01

    An investigative study was made of the use of waste edible oil as fuel and recycle use of residual food in the food service business. As to the existence/recovery of edible oil, it was found out that waste edible oil of 15.9g/meal per capita was discharged at multiple wide-area distributed shops and that the total amount reached 1,861kl/y in the country. Concerning the technology for using it as biodiesel fuel, Ronford Co., which has the most actual results of the technology, recovers waste edible oil in Kyoto City, refines it and uses it as fuel for the City's garbage truck. About the use of waste edible oil as boiler use fuel, there are examples in Sapporo Grand Hotel, which has been contributing to energy conservation for more than five years. In the assessment of the profitability as project, for the direct combustion for boiler fuel use, the same/large heat supply system is a prerequisite, and for the hot stove loaded type direct combustion, there is an element of the technology development. Therefore, the use as bio-diesel fuel is most expected, though there is a taxation problem. (NEDO)

  10. Survey report for fiscal 1998. International project for rationalizing energy use (a project for investigating analyzing a tool to improve energy consumption efficiency in Asia) (Data collection 1 (Year 1990 data)); 1998 nendo kokusai energy shiyo gorika nado taisaku jigyo chosa hokokusho. Asia energy shohi koritsuka bunseki tool chosa jigyo (shiryoshu 1 1990 nen data)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    With an objective to identify quantitatively the mutually influencing effect of economical development and energy consumption efficiency improvement in the entire Asia-Pacific region, a data collection was prepared according to the common industry classification as a tool to analyze energy consumption improvement in Asia. This data collection summarizes the industry relation tables and the energy relation tables available in eight Asian countries (Korea, Indonesia, Thailand, Philippines, China, Taiwan, Singapore and Malaysia) and Japan. Both kinds of the tables are unified in conception among the nations, hence comparable. The industry relation table consists of a basic transaction table, a charged coefficient table, a final demand converter table, an import coefficient table, a reverse matrix table, a sensitivity coefficient able, an influence force coefficient table, a production inducing amount table, a production inducing coefficient table, a production induction dependence table, an import inducing amount table, an import induction coefficient table, and an import induction dependence table. The energy table consists of an energy input table, an energy consumption table, and an emission table. (NEDO)

  11. FY 2000 report on the research cooperation project on the research cooperative follow-up for development of the manufacturing technology supported by advanced and integrated information system through cooperation; 2000 nendo kenkyu kyoryoku jigyo. 2000 nendo kan'i sosagata denshi sekkei seisan shien system no kaihatsu ni kansuru kenkyu kyoryoku follow up jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The manufacturing technology supported by advanced and integrated information system through cooperation (MATIC), that is, a project supporting the production technology including the international information system and CAD/CAM system, etc. was carried out from FY 1994 to FY 1998. From FY 1999, the follow-up project is being implemented for the spread of the MATIC results, support for the independent R and D and the technical guidance. China, Indonesia, Malaysia and Singapore participated in this project, by which the support and technical guidance were given in three fields: automobiles/the parts; household electric appliances/the parts; fiber/apparel. At present, each country is continuing its own activity for using the system developed in the MATIC project in its country. In this fiscal year, researchers were sent to each country for supporting the activities. Further, the MATIC follow-up committee was established to conduct the drawing-up of a business plan, grasp of the state of the spread/R and D, discussion about problems/subjects, comprehensive evaluation of the MATIC project, etc. (NEDO)

  12. Report for fiscal 1999 on the international and fundamental cooperation project for energy consumption efficiency improvement and the international conference project such as IPCC. The meetings of IPCC specialists and IPCC symposiums; 1999 nendo kokusai energy shohi koritsuka nado kyoryoku kiso jigyo / IPCC nado kokusai kaigi jigyo. IPCC senmonka kaigo oyobi IPCC symposium hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-10-01

    This paper reports the meetings of specialists and the symposiums by the inter-governmental panels for climate change (IPCC) in fiscal 1999. Three working groups were established for evaluation on climate change from scientific aspects, evaluation on effects and countermeasures from socio-economic aspects, and evaluation on mitigation measures from socio-economic aspects. The working groups have started preparing the third evaluation reports. Common problems are handled in a unified framework as the traversable problems. Specialist meetings are held for several important themes. Especially for the cost problems, preparation of a guidance paper has started, that include the costs and benefits by territories and departments. The themes for the specialist meetings include: cost problems related to effects and countermeasures for climate change and mitigation measures; the IPCC activities for the cost evaluation in the past and an outline of the traversable problems; problems in effects, applicable measures, and mitigation measures; and unification of the cost evaluations. The themes for the symposiums are the frontier line of the climate change problems, and include the outline of IPCC, the current status and issues in the working groups and the special reports for each group. (NEDO)

  13. Fiscal 1998 intellectual infrastructure project utilizing civil sector functions. Research and development project on prompt-effect type intellectual infrastructure creation (Research and development concerning environment-related reference materials); 1998 nendo minkan no kino wo katsuyoshita chiteki kiban jigyo seika hokokusho. Sokkogata chiteki kiban sosei kenkyu kaihatsu jigyo (kankyo kanren hyojun busshitsu ni kansuru kenkyu kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Concerning an information providing system on environment-related reference materials, studies were conducted about the contents of information to be provided and about hardware and software suitable for such a system. In a survey of needs for such an information system, questionnaires were sent to 320 agencies and business corporations providing or utilizing reference materials in the field of chemistry and environments, and 158 answers were received. Further surveys were carried out by visiting more than 20 organizations providing or utilizing reference materials. As for activities overseas, surveys were conducted in Europe, North America, and Oceania, when IRMM (Institute for Reference Materials and Measurements) of Belgium, Merck KGaA of Germany, and some others were visited. It was then found that they desired that retrieval of information on reference materials in Japan and abroad be enabled by merely accessing related Internet sites. To meet the wish, a concept design was prepared of a comprehensive information system on reference materials in the form of an Internet home site. (NEDO)

  14. Fiscal 1999 research report. Data acquisition and analysis on the advanced high-efficiency energy system field test; 1999 nendo sendoteki kokoritsu energy system field test jigyo ni okeru data shuyaku oyobi hyoka kaiseki chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Although the next-generation phosphoric acid fuel cell has nearly reached its practical application stage as far as technology is concerned, its diffusion is yet to come due to lack of data about its cost efficiency and reliability. Under the circumstances, the goal now is to collect and analyze various data obtained in the above-named project which was started in fiscal 1997 for the compilation of data useful for full-scale diffusion in the future so that a foundation may be built for the overall popularization of the fuel cell. In this fiscal year, assessment and analysis have been conducted at 15 test sites now in presence. At the second plant of the Semboku LNG Terminals where approximately 17,000 hours have elapsed since the test began, the cell has operated for more than 16,000 hours in total. The Mycal Bore Sanda has established the longest uninterrupted operation record of 6,500. As for power generation efficiency, a town gas 13A-fueled system exhibits approximately 40% operating smoothly at a high overall efficiency of not less than 90%. (NEDO)

  15. Joint research achievement report on field test project for photovoltaic power generation of industrial use in fiscal 2000 (5/5); 2000 nendo sangyo tou you taiyokohatsuden field test jigyo kyodo kenkyu seika hokokusho 5/5

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-05-01

    This paper summarizes the achievements in fiscal 2000 on the field tests for photovoltaic power generation of industrial use. This report describes the details of the achievements on the following organizations: the Hiroshima Riverside Hotel; the Saraya Corporation; the Nanshin Subaru Corporation; the Ricoh Uni-techno Corporation; Toyota Motors Kyushu Corporation (Eco-center); Hitachi Electric Wires; Yuasa Corporation, Furukawa City in Ibaraki Prefecture; the Takasaki Branch Office of East Japan Passenger Railways; the World Trade Center Building, the Minami Trading Company, Onga Township in Fukuoka Prefecture; the Keio Electric Railways (Wakabadai Station); the Business Enterprise Bureau of Kyoto Prefectural Government; Okinawa Electric Power (Kita-Daito Island), Kawagoe Township in Mie Prefecture, the Keio Electric Railways (Meidai-mae Station); Kitakata Township in Gifu Prefecture; the Yamaguchi Prefectural Government; the MSK Corporation; the Fuji Pream Corporation; Kumano Township in Hiroshima Prefecture; Fukuroi City in Shizuoka Prefecture; the Water Supply Bureau of Yokohama Municipality in Kanagawa Prefecture; Ashiya City in Hyogo Prefecture; Shinoyama City in Hyogo Prefecture; the Gantan Beauty Industry; the Toyokuni Industry; and Minoo City in Osaka Prefecture. (NEDO)

  16. FY 1999 project on the development of new industry support type international standards. Standardization of color management; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Iro saigen kanri (color management) no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of eliminating variations in color reproduction in multi-media output devices, study was conducted of making a standard plan for color information equipment as hardware and for the software to determine the characteristics, and the FY 1999 results were summarized. As to the standardization of color control in input/output devices, characteristic dependency of color printer under environmental conditions such as ambient temperature/humidity was determined. And to integrate it into the ICC profile, the profile was expanded. Concerning the standardization of multi-spectrum color image description format, non-linear spectral characteristics were investigated which are dependent on types of light sources, light intensity and geometric conditions. In relation to the standardization of psychological color reproduction, the scope of the experiment using examinee was expanded, and the study was so conducted that the standard image for skin color evaluation use can be recognized as the one that has statistical accuracy. A sequence method which is more simple and more effective was established. In the discussions of the proposed international standards, studies were carried out of the electronic still camera color characteristics measurement and the color space ISO RGB. (NEDO)

  17. Achievement report for fiscal 1998 on joint research business (2/2). Photovoltaic power generation field test for public facilities; 1998 nendo kokyo shisetsu nadoyo taiyoko hatsuden field test jigyo (2/2). Kyodo kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    Photovoltaic power generation systems are experimentally installed at public facilities at various locations, and subjected to field tests in which they experience long-term operation under real loads. Mie Prefectural Iidaka Senior/Junior High School has a 10kW solar cell system installed on the south-side roof of the school house. The system is linked to an in-house transformation station and the power generated by the system is supplied to the lighting and air-conditioning facilities in the building, and surplus if any is transmitted to the Chubu Electric Power Co., Inc., system. A field test is being conducted to determine if there are usability and safety in the 10kW system. A number of like systems are undergoing field tests, installed at a comprehensive technological training center of Kyushu Electric Power Safety Association, Kongo Gakuen Senior High School, Sakata Nursery School, Taiyo Daiichi Nursery School, Minami Kindergarten, Neyagawa Ishizu Old People's Home, Co-Op Living Konan, Factory Hishimeki, Tochigi Fuji Industries, Gamo-cho Hirabayashi Public Hall, Fukuoka Prefectural Culture Complex, Yatsusugi Forest Schooling Center, Osaka Prefectural Murano Water Purification Plant, Yamanashi Institute of Environmental Sciences, Utatsu-cho Town Office, Ginga Gakuen Junior High School, etc. (NEDO)

  18. Report on the survey of the project for working out the new energy vision of Shinjo Village. New energy vision of Shinjo Village; 2001 nendo Shinjo son shin energy vision sakutei tou jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-02-01

    For the purpose of promoting the introduction of new energy and enhancing the awareness of it in Shinjo Village, Okayama Prefecture, an investigational study was conducted of the energy demand of the village, existence amount of new energy, project for new energy introduction, etc., and a new energy vision was worked out. The energy demand amount of the village was estimated at 1,442.5kL in terms of crude oil. The rate of energy source was 48% of automobile use fuel, 25% of electric power, 20% of kerosene and 7% of LPG. As the project for new energy introduction, the following were studied: power generation by direct combustion/gasification of wood biomass such as forest trees; power generation/heat utilization using agricultural waste such as rice straw/hull; production/utilization of wood pellet; introduction of photovoltaic power system/solar heat utilization system to tourist facilities/welfare facilities such as the village office/elementary school/junior high school/michi-no-eki (service area along the road); introduction of clean energy vehicle to tourist resort; introduction of street light with solar panel/wind power generator/storage cell; introduction of micro hydraulic power generation. (NEDO)

  19. Fiscal 1996 New Sunshine Plan auxiliary project. Report on results on development of coal hydrogasification technology (Support research); 1996 nendo New Sunshine keikaku hojo jigyo seika hokokusho. Sekitan suiso tenka gaska gijutsu kaihatsu shien kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    R and D was conducted for the purpose of developing the alternative natural gas manufacturing process that, using coal as the raw material, is highly efficient as well as environmentally superior, with the fiscal 1996 results reported. A test research was carried out on the coal hydrogasification process which was selected as the optimum process based on the studies in the previous years. On the basis of the results of the studies, a free fall pyrolyzer was employed as the test equipment for the use of behavior research of hetero-elements in the test. The basic specifications were set based on a hydrogen/coal ratio of 0.2, a temperature of 950 degrees C and a pressure of 7 MPa, which are the reaction conditions of the ARCH reactor, with the basic design drafted accordingly. In a preliminary examination on the mechanisms of the coal hydrogasification reaction, analysis was made on the representative 20 different kinds of coals, on the six kinds of which studies were made on the gasification behavior using a constant heating rate pyrolyzer. As a result, from the temperature dependency of a methane forming speed, it was assumed that three components of coal had bearing upon the gasification behavior. (NEDO)

  20. Fiscal 1998 New Sunshine Plan auxiliary project. Report on results on development of coal hydrogasification technology (Support research); 1998 nendo New Sunshine keikaku hojo jigyo seika hokokusho. Sekitan suiso tenka gaska gijutsu kaihatsu shien kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    R and D was conducted for the purpose of developing the alternative natural gas manufacturing process that, using coal as the raw material, is highly efficient as well as environmentally superior, with the fiscal 1998 results reported. A hydrogasification test was conducted on Taiheiyo coal at a temperature of 1,173k and a pressure of 7 MPa, which showed that all gaseous products other than methane stopped their evolution roughly in the heat-up process, while methane continued to evolve to show the highest yield. In the reactivity comparison of various types of coal, coals with carbon content of 80% or below were high in reactivity and considered suitable for hydrogasification feedstock. It was also suggested that the hydrogasification reactivity of low rank coals including sub-bituminous coals or below might be greatly affected by the presence/absence of the catalytic effects of ion-exchanged metals. Behavior experiments of sulfur and nitrogen in coal in the hydrogenation reaction were carried out using a continuous free-fall type reactor, which elucidated the effects of hydrogen pressure and gas residence time among various operational elements. (NEDO)

  1. Report on the project on the researcher dispatch type international joint research survey. International joint research for creation of new industries; Kenkyusha hakengata kokusai kyodo kenkyu chosa jigyo. Shinki sangyo soshutsu kokusai kyodo kenkyu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of digging up themes of the joint research which develop the R and D in the industrial field in Japan to a new stage, researchers were dispatched to the world representing research institutes to make the research study. As to the survey of the trend of bio-informatics research, visits for survey were paid by 8 researchers to 19 research institutes in the U.S., Australia, France and Germany, and survey was made of the state of new researches such as the genetic network analysis by DNA chip data. Relating to the survey of the trend of the plan for ape genomic DNA sequence, visits for survey were paid by 6 researchers to 12 research institutes in Japan, Germany, France and the U.K. Concerning the research survey with aim of developing the selective reversible expression technology of target genes, researchers were dispatched to St. Jude Children's Research Hospital in the U.S. to conduct the following: construction of basic expression vectors, functional evaluation using cultured cells, making of the transgenic mice to which medicine dependent and cell peculiar expression control genes were introduced, analytical study of the situation of expression control, etc. (NEDO)

  2. Achievement report for fiscal 1998 on joint research business (1/2). Photovoltaic power generation field test for public facilities; 1998 nendo kokyo shisetsu nadoyo taiyoko hatsuden field test jigyo (1/2). Kyodo kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    Photovoltaic power generation systems are experimentally installed at public facilities at various locations, and subjected to field tests in which they experience long-term operation under real loads. At Livelihood Cooperative Association Co-Op Kanagawa, a photovoltaic cell system is installed on the roof, facing true south, of its Yokohama eastern district joint purchase center, and the power generated by the system is utilized as interconnected with the commercial distribution line connecting to its power facilities. It is called a '10kW Photovoltaic Power Generation Model System,' and is subjected to a verification test, carried over from the previous fiscal year, centering about its usability and safety. Similar systems are also installed at many locations, such as the Kadosawa Bridge district of Ebina City, Kanagawa Prefectural Industrial Technology Research Center, Shiga Prefectural University, Suntory Museum, Fukui Institute of Technology, Saigo Police Station, Higashi-Murayama Water Purification Plant, Kanagawa Prefectural Disaster Prevention Center, Toyosato-cho Health Center, Kyodo Gakusha School, Sakuragi Nursery School, Yagi Junior High School, Shizuoka Prefectural Environmental Radiation Monitoring Center, Tanabe City Health Center. (NEDO)

  3. Survey report for fiscal 1998. Joint research project with researchers related to petroleum substituting energies in the EU countries; 1998 nendo EU shokoku no sekiyu daitai energy kanren kenkyusha tono kyodo kenkyu jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    It was intended to invite researchers related to petroleum substituting energies from the EU countries to perform joint researches at research organizations under the auspices of the Agency of Industrial Science and Technology having deep relations with research themes of the invited researchers, to deepen the mutual understanding, and to form efficient cooperative relationship. The intention is also to contribute to research and development of petroleum substituting energies to be used in Japan in the future. The research themes, researchers, their research organizations, and the receiving research organizations are as follows: (1) evaluation of reservoir impedance in high-temperature rock experimental fields by Mr. Ralph Weidler (Germany) at Ruhr University received by the Resource and Environmental Technology Research Institute; (2) changing the particle boundary structure of ceramics by using the alkoxide process by Dr. Ramon Torrecillas (Spain) at Institute Nacional del Carbon received by the Nagoya Industrial Technology Research Institute; (3) research on corrosion in metallic materials for molten carbonate type fuel cells by Dr. Giuseppe Calogero (Italy) at Institute for Transformation and Storage of Energy received by the Osaka Industrial Technology Research Institute; and (4) estimation of behavior of deep geothermal reservoirs with high enthalpy by Dr. Enrico Maranini at Universita' Di Ferrara received by the Geology Survey Center. (NEDO)

  4. FY 1999 Report on the technical results. Research and development project for creation of the quick-effect type international standards (Comprehensive surveys); 1999 nendo sokkogata kokusai hyojun sosei kenkyu kaihatsu jigyo seika hokokusho. Sogo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Safety, environment protection and internationality are most important product qualities, and international standardization of product qualities and testing methods are essential for strengthening international competitiveness. Viewed from this angle, the R and D project is conducted to propose the international standards for the following 5 areas related to environment and safety, selected in expectation that the results could be obtained in short time for preparation of the international proposals; (1) standardization of the wireless IC tags for logistics management, (2) standardization of quality and testing methods of automobile fuels and lubricants, (3) research and development for international standards in the field of safety of machinery, (4) standardization of evaluation methods for electronic data security system, and (5) standardization for the safety of light emitting diodes. The results are obtained for preparation of the international standard drafts, interim or final. The activities are directed to promotion of international interchangeability of radio frequency identification (RFID) systems for area (1); to standardization of the systems for emergency stopping/controlling machines for the area (3), to improvement of security evaluation standards of existing information systems for the area (4), and to unification of the ISO/IEC safety standards for the area (5). (NEDO)

  5. Fiscal 1999 technical survey report. Model project implementation feasibility study in India on cement calcination facilities waste heat recovery; 1999 nendo Indo ni okeru cement shosei setsubi hainetsu kaishu model jigyo jisshi kanosei chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    India produces 96-million tons/year of cement, ranking fourth in the world, and 55% of the yield comes from 1-million tons/year plants. Some of the waste heat from the manufacturing process is used to dry materials, etc., but much is discharged into the atmosphere. Estimation is made of the energy conservation effect expected to be brought about in case the waste heat power generation technology which is in use to good effect in Japan is introduced into Indian cement plants whose clinker production exceeds 3,000 tons/day. As the result, it is concluded that the model project may be implemented at any of the four plants for which power generation capability and CO2 reduction effect are tentatively calculated below. There will be power generation of 7,300kW and CO2 reduction of 43,125 tons for the Guijarat Ambuja Cement Ltd./Ambuja Cement Eastern plant; power generation of 7,700kW and CO2 reduction of 901,960 tons for the India Cement Ltd./Rassi Cement plant; power generation of 45,098kW and CO2 reduction of 1,140,220 tons for the Larsen and Toubro Ltd./Hirmi plant; and power generation of 5,450kW and CO2 reduction of 32,230 tons for the J. K. Corp Ltd./Lakshmi Cement Sirohi plant. (NEDO)

  6. Achievement report for fiscal 1998 on joint research business (2/2). Photovoltaic power generation field test for public facilities; 1998 nendo kokyo shisetsu nadoyo taiyoko hatsuden field test jigyo (2/2). Kyodo kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    Photovoltaic power generation systems are experimentally installed at public facilities at various locations, and subjected to field tests in which they experience long-term operation under real loads. Mie Prefectural Iidaka Senior/Junior High School has a 10kW solar cell system installed on the south-side roof of the school house. The system is linked to an in-house transformation station and the power generated by the system is supplied to the lighting and air-conditioning facilities in the building, and surplus if any is transmitted to the Chubu Electric Power Co., Inc., system. A field test is being conducted to determine if there are usability and safety in the 10kW system. A number of like systems are undergoing field tests, installed at a comprehensive technological training center of Kyushu Electric Power Safety Association, Kongo Gakuen Senior High School, Sakata Nursery School, Taiyo Daiichi Nursery School, Minami Kindergarten, Neyagawa Ishizu Old People's Home, Co-Op Living Konan, Factory Hishimeki, Tochigi Fuji Industries, Gamo-cho Hirabayashi Public Hall, Fukuoka Prefectural Culture Complex, Yatsusugi Forest Schooling Center, Osaka Prefectural Murano Water Purification Plant, Yamanashi Institute of Environmental Sciences, Utatsu-cho Town Office, Ginga Gakuen Junior High School, etc. (NEDO)

  7. Survey report on the environment harmonizing type energy community survey project for the coastal area in the Kawasaki ward in fiscal 1998; 1998 nendo Kawasakiku rinkaibu chiiki kankyo chowagata energy community chosa jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In energy utilization in the 'Kawasaki Zero Emission Industrial Complex', optimal regional heat supply systems were discussed. The discussion was made from the viewpoints of introduction of saving-type energies, new energies and renewable energies, and environment preservation performance. The coastal area in the Kawasaki ward is planned of developing an industrial complex with an area of 8.4 ha for operation of about twenty companies. In the assumption of heat demand, four companies only were taken up as the object of the discussion, who utilize heat supply from steam as process heat source for their factories. The total heat demand quantity and heat demand pattern used for the discussion were assumed by hearing and actual record submitted from each company. Optimal systems were discussed on heat supply systems utilizing steam produced by steel mills, with the discussion made on waste heat recovered steam in processes and steam extracted from thermal electric power plants in the steel mills. As a result of the discussion, heat supply utilizing the steel mill steam was found capable of being provided with much lower price level as the estimated unit price than general direct steam supply, leading to a judgement that the system has business feasibility. (NEDO)

  8. FY 1999 report on the model project on the effective utilization of waste-base biomass fuels. Basic survey for the feasibility; 1999 nendo haikibutsukei biomass nenryo yuko riyo model jigyo jisshi kanosei kiso chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Survey on the waste biomass was conducted for Thailand, Malaysia, Indonesia, Vietnam, Laos, Nepal, Butan, Myanmar and Cambodia to study feasibility of the project for the concrete utilization of biomass resources. In Thailand, it is expected to construct large-scale model plants for biomass resources such as rice hulls, bagasse, wood waste and oil palm. In Malaysia, expected are the cogeneration at 5MW class palm oil plant, large-scale power plant using wood waste, plant using the biomass from waste palm oil, etc. In Indonesia, there is a great potentiality, but it is necessary to handle it carefully in consideration of the unstable situation of the society. In Vietnam, the detailed survey of feasibility is needed on the project for efficiency heightening at state-run plants, the assumed national plants (recommended by the government), etc. In Laos, small-scale power generation using the forestry waste such as sawdust is expected. (NEDO)

  9. Fiscal 2000 report on result of R and D of nonmetallic material recycling promotion technology (demonstration test and research, total system technology); 2000 nendo hitetsu kinzokukei sozai recycle sokushin gijutsu kenkyu kaihatsu seika hokokusho. Jissho shiken kenkyu, total system gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    R and D was conducted on advanced recycling technology for aluminum and base metal/rare metal based materials, with fiscal 2000 results compiled. In the research of aluminum recycling technology, on a continuous fractional crystallization process and a purification by zinc removal process, the existing facilities for each demonstrated that they could simulate an aluminum scrap melting process capacity of 1,000 t/month, with a series of initial conditions determined. In the research of total system technology, combined test facilities were completed in which a purification process and a melt cleaning process were integrated. In the research of the recycling technology for base metal/rare metal based materials, a test was carried out by demonstrative facilities, with the aim of establishing copper regeneration technology in which high grade copper is produced using metal/resin based scraps such as shredder dust of automobiles as the materials. In structuring the total system technology, a preliminary survey and environmental load measures were carried out toward the practicability of a comprehensive copper metal collection recycling system. (NEDO)

  10. Report on survey on geothermal development promotion in fiscal 1999. Report on survey on environmental effects - noise and vibration (No. B-5, Busadake Area); 1999 nendo chinetsu kaihatsu sokushin chosa. Kankyo eikyo chosa (soon shindo) hokokusho (No.B-5 Busadake chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Identification of noise and vibration levels and evaluation on environmental effects were performed in association with the excavation in the geothermal investigation well drilling point (well N11-MD-3) and the vicinity thereof in the Busadake area in Hokkaido. In the survey, noise and vibration were measured before and during the well excavation at the well drilling point and nearby four points (boundary of the drilling premises, 500-m point, Kawakita Spa and the entrance to the mountain stream of petroleum). In addition, a distance decay survey was carried out at five points in one direction from the well drilling point. The result of the noise measurement showed the value of about 30 to 50 dB before the well excavation at the drilling point and its vicinity, and about 40 to 60 dB during the excavation. The vibration was about 40 dB at the boundary of the premises during the excavation, whereas the places other than them showed the lower limit of measurement. In the distance decay of the noise, 75 dB at the 10-m point decayed to 50 dB or lower in the 200-m point, while the vibration level of 75 dB decayed to 30 dB or lower in the 100-m point. These facts lead to a conception that the noise and vibration in association with the well drilling would not give great influence on the neighboring environment. (NEDO)

  11. Investigations in fiscal 1986 on promotion of geothermal development. Part 2. Report on precision structural test well drilling and investigation works in Otaki area; 1986 nendo chinetsu kaihatsu sokushin chosa hokokusho. 2. Otaki chiiki seimitsu kozo shisui oyobi chosa koji

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-09-01

    With an objective of promotion of geothermal development in the Otaki area in Nagano Prefecture, precision structural test well drilling and investigation works have been carried out, and the result thereof reported. The investigated area is an inclined land with an area of 70 km{sup 2} at altitudes of 1,000 to 2,000 m in the southern foot of the Mitake volcano having Otaki River as the southern border. The investigation has performed during the period from March 2 to September 30, 1987 the drilling of the N61-OT-5 test well hole (depth of 502.0 m), temperature logging, temperature restoration test, water injection test, and core test. The result of the investigation may be summarized as follows: existence of the stratigraphic succession as predicted by ground surface investigation, and existence of the Mesozoic and Palaeozoic strata of the Mino belt were verified; the Mesozoic and Palaeozoic strata of the Mino belt being the base bed have only small cracks, and very little alteration can be identified; X-ray diffraction of powder from test drilled cores recognized very little minerals altered by hot water; and the temperature logging and temperature restoration test identified no temperature indication that clearly indicates existence of heat sources. As a conclusion, there is no alteration due to hot water down to 500 m below the surface in the vicinity of the investigation well, and the possibility of a geothermal reservoir to exist is extremely low. (NEDO)

  12. FY 1992 report on the survey of geothermal development promotion. Supplementary survey on data processing (No.38 - West area of Mt. Aso); 1991 nendo chinetsu kaihatsu sokushin chosa. Data shori ni kakawaru hosoku chosa hokokusho (No.38 Asosan seibu chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-09-01

    As a part of the survey of geothermal development promotion in FY 1992, chemical/isotopic analysis of fumarolic gas in the Yoshioka district was made to elucidate the underground geothermal structure in the west area of Mt. Aso in Kumamoto Prefecture. Items for analysis of fumarolic gas were 16 items including the temperature, concentration of non-condensable gas, CO2, H2O, CH{sub 4}, {delta}D(CH{sub 4}) and {delta}{sup 13}C(CO2). Items for analysis of condensed water were 9 items including pH, Na, NH{sub 4}, {delta}D(H2O) and {delta}{sup 18}O. As a result of the analysis, the main component of non-condensable gas of fumarolic gas was CO2, and the composition was similar to that of the fumarolic gas in the Yunoya/Tarutama district in the periphery. It was presumed that the origin and formation mechanism of fumarolic gas were also similar to those in the Yunoya/Tarutama district. It was presumed that the deep geothermal reservoir which is the source of vapor/gas generation was composed of the neutral or alkalescent geothermal water, and a possibility that the reservoir is connected with the deep geothermal reservoir in the Yunoya district was presumed from a viewpoint of geographical location. (NEDO)

  13. FY 1999 report on the survey of the reinforcement of the base for introduction/spread/improvement of clean energy vehicles in the Kinki region, Japan; 1999 nendo chosa hokokusho. Kinki chiiki clean energy jidosha donyu fukyu sokushin kiban kyoka chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Survey was made with the aim of studying measures to be taken for introduction/promotion of clean energy vehicles (CEV) in the Kinki region and of making a guidebook which included 8 CEV introduction menus based on the characteristics/needs in the Kinki region. In the survey of the state of CEV introduction in the Kinki region, a total number of the CEVs introduced in the region was estimated at approximately 5,300 (19.1% of the whole country), which indicated that the CEV introduction was increasing in comparison with the rate of the general vehicles registered (14.6% of the whole country). On the other hand, the fuel supply stations prepared such as eco-station are limited mostly to Osaka prefecture, which showed that the base is still unprepared. From the questionnaire survey made for 367 autonomous bodies and main 73 companies, problems and the needs for the wide area/large quantity spread were grasped, and various basic data were obtained. To solve problems, the setting-up of the Kinki CEV introduction/spread/promotion committee (CEV Kansai) was studied. (NEDO)

  14. Promotion of the formation of environmentally friendly energy community (FY 2000). Demonstration of the gas turbine repowering waste combined power generation technology; 2000 nendo kankyo chowagata energy community keisei sokushin seika hokokusho. Gas turbine repowering haikibutsu fukugo hatsuden gijutsu jissho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Demonstrative operation was conducted of the super waste power generation system in which the low temperature steam generated in waste incinerator is raised in temperature using the combustion exhaust gas emitted after the power generation using another gas turbine for conducting the steam turbine power generation with high efficiency. The FY 2000 results were summed up. In the demonstrative operation, operation and data acquisition/analysis were conducted following the previous fiscal year by 25MW class gas turbine repowering waste combined power generation facilities (Takahama power plant). Further, four years after the start of operation, the secular variation was studied by disassembly/inspection of equipment. As a result of the operation, the thermal efficiency was approximately 35%, much higher than the existing waste power generation. It was verified that the power system was maintained by the same maintenance as that of the ordinary power system. Moreover, the important point of this system is that no special corrosion resistant materials are used and that the high-efficiency waste power generation was demonstrated by combining the existing equipment. It can be said that the super waste power system has high qualities for forming energy community as a regionally dispersed stabilized power source. (NEDO)

  15. Fiscal 1999 survey for promotion of geothermal energy development. Survey report of environmental impact survey - Hot spring fluctuation (No. B-5, Musadake district); 1999 nendo chinetsu kaihatsu sokushin chosa. Kankyo eikyo chosa hokokusho (onsen hendo) (No.B-5 Musadake chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    Research boreholes N11-MD-3 and -4 were drilled in Shibetsu-cho, Shibetsu-gun, Hokkaido, in the period July 1999 through December 1999, and thermal water was examined at the sites in July and November 1999. For the purpose of detecting the impact of the said work on the environment, local hot springs were examined for their status before, during, and after the drilling period. Measurements were conducted in the period August 5, 1998, through December 31, 2000. It was found that no fluctuation in water temperature or yield attributable to the drilling was detected. Hot springs were examined for nine items including water temperature and pH level at four spots which were Kaiyo-dai, River Tenyu, and Otoko-yu and Onna-yu of Kawakita Hot Spring, when 23-31 measurements were performed from each of the four. (NEDO)

  16. Report on the results of the fiscal 1998 survey of arrangement/promotion of the overseas coal import base. Model survey for high level coal utilization promotion models (survey of the present and future situation of coal energy after COP3); 1998 nendo kaigaitan yunyu kiban seibi sokushin chosa (sekitan kodo riyo sokushin model chosa). COP3 iko no sekitan energy no genjo oyobi shorai chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    For the purpose of contributing to the future coal industrial policy of Japan, an investigational study was conducted on the nature of coal as resource, the production/utilization status, policies of other countries, etc. The coal demand during the period of 1991 through 1995 rapidly increased in Asia, slightly rose in North America, decreased in East and West Europe, and largely declined in the former U.S.S.R. The energy demand showed a large growth rate with the economic growth in developing Asian countries in and after the 1980s as a background. The power demand which supports the economic growth will continue to improve. It connects with the coal demand in Asia, and the coal demand seems to rapidly increase. Further, the global warming issue became a great matter of concern in the 1990s. Coal, which emits more CO2 per unit calorific value than oil and natural gas, is not a powerful candidate for petroleum substituting energy as used to be regarded, but became a bad thing. Moreover, recently the economic stagnation in Asia which was triggered by the currency crisis has long been continuing, and it started to appear that the coal consumption will possibly fall very short of the prediction. The future is unclear. 20 refs., 25 figs., 39 tabs.

  17. Fiscal 1998 intellectual infrastructure project utilizing civil sector functions. Research and development project on prompt-effect type intellectual infrastructure creation (Data buildup for assurance of safety of non-ferrous metals); 1998 nendo minkan no kino wo katsuyoshita chiteki kiban jigyo seika hokokusho. Sokkogata chiteki kiban sosei kenkyu kaihatsu jigyo (hitetsu kinzoku no anzensei kakuho ni shisuru data seibi)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Data were collected, put in an easy-to-use order, and developed into a database for safety assurance for automobiles and transportation equipment built of light metals as represented by aluminum. In the collection and arrangement of existing dynamics data, a database having 52 data relating to dynamic properties was prepared after retrieving data from academic essays previously published in Japan and abroad. In the testing of new materials, a Hopkinson high-speed rod-type impact/tensile tester was used to perform tensile tests at eight load application speeds between 0.5mm/min and 50m/sec for practical aluminum alloys 2024, 2091, 5052, 5083, 5254, 6061, 6063, 6NO1, 7075, and AC4CH. As the results, data on the 5000 and 6000 series alloys which had been insufficient were complemented. Data from a newly introduced multi-functional instrumentation Charpy impact tester were compared for study, correlations between property values obtained from bend test specimens and those obtained from tensile test specimens were evaluated, and then a simplified test evaluation method was proposed. (NEDO)

  18. Fiscal 2000 achievement report on project for research and development of intelligent infrastructure creation and utilization technologies. Research and development project on high-speed deformation characteristics evaluation methods for metallic materials; 2000 nendo chiteki kiban sose riyo gijutsu kenkyu kaihatsu jigyo. Kinzoku zairyo no kosoku henkei tokusei hyoka hoho no kenkyu kaihatsu jigyo - Gyomu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Efforts were made to develop methods for evaluating the characteristics of metallic materials experiencing high-speed deformation or impact deformation. The research was conducted by the research WG (working group) consisting of some participants of an international conference convened this fiscal year. The research result revealed that studies in Japan lopsidedly dealt with metallic materials at strain velocity of 10{sup 4}/second or less, such as steel, while many studies overseas dealt with materials other than metals at strain velocity over 10{sup 4}/second. The test and evaluation WG conducted high-speed tension tests for T6-treated aluminum alloys using the split Hopkinson bar method, hydraulic servo method, one bar method, and the sensing-plate method for measuring force, and the results were compared. It was then found that the one bar method produced disturbance more remarkably than the others and that the loading block structure and load rise time influenced the emergence of the peak load. The emergence of a peak load in the Hopkinson bar method or the one bar method had been predicted on the basis of the research conducted by the analysis group. (NEDO)

  19. Report on achievements in proliferation project to assist introduction of environment harmonizing type coal utilization system in fiscal 1998. Joint demonstration project for CMG recovery and utilization system in fiscal 1998 (utilization facilities); Kankyo chowagata sekitan riyo system donyu shien nado fukyu taisaku jigyo seika hokokusho. 1998 nendo CMG kaishu riyo system kyodo jissho jigyo (riyo setsubi)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    This paper describes the achievements of the discussions in fiscal 1998 on the utilization facilities related to the coal bed methane gas supply plan for the city of Tieling in China. The gas quality standard calls for 3,500 kcal/m{sup 3} or more (methane concentration of 41% or higher). The supply is planned to start in December 1999, and continue the supply of 141,000 Nm{sup 3}/day in 2000, and 212,000 Nm{sup 3}/day in 2001 and thereafter. A gas supply center to collect gases recovered from each mine will be installed in the vicinity of the existing gas holder located about 2 km east of the Tiefa Mining Bureau. The Japanese side bears the cost of installing a gas compression and transportation facility for gas supply to the city of Tieling, a monitoring system, and devices for comprehensive surveillance system. This paper shows the overall plan drawings, the drain separator room building plan, the plans for arranging devices in the machine room, and the piping scheme. In addition, the piping plan around the gas holder, and the basic device plan are shown. Also appearing in the paper are the machine summary drawings, summarized flow charts, gas holder plan, de-humidifier plan, and electricity and instrumentation plans. The main body and supporting structure for the gas holder, and the foundation strength calculation sheets are also shown. Descriptions are given also on the facilities to deal with variation in demand quantity and supply quantity. (NEDO)

  20. Report on survey project for demonstration of warm sea water bathing facilities using unutilized resources such as wastes in islands by carbonizing them into energy; 2001 nendo kankyo chowa gata energy community field test jigyo chosa hokokusho. Rito ni okeru haikibutsu tou mikatsuyo shigen no tanka energyka no kaisui on'yoku shisetsu heno jissho chosa jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-05-01

    Surveys and discussions have been performed in Yuge Town in Ehime Prefecture for aiming at promotion of district development and zero emission in islands by carbonizing general wastes (household refuses and business operation wastes) and bamboos in the islands to utilize their energies as a substitute for the heat source of the warm sea water bathing facilities, as well as utilizing the produced carbides as soil improving materials or deodorants. The surveys were performed on bamboo carbonizing and gas carbonizing technologies, energy utilization feasibility, analysis of wastes composition, and identification of quantity of bamboos in existence. In discussing the energy utilization system by means of carbonization, it was revealed that the introduction of the bamboo carbonizing and gas carbonizing technologies can sufficiently satisfy the heat demand of the Yuge Town community facilities, although the amount of heat that can be supplied may vary because of difference in the technical processes. Also with regard to the problems of dioxins contained in the discharged gas and the problems of heavy metals contained in the carbides, it was discovered that different environmental criteria can be met as evidenced by the existing demonstration data. (NEDO)

  1. Fiscal 2000 achievement report on the venture business assisting type regional consortium - Core industry creation type. Thermoelectric energy recovery system for automobile; 2000 nendo chiiki consortium kenkyu kaihatsu jigyo seika hokokusho. Jidoshayo netsuden energy kaishu system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The project aims to develop a system for recovering heat from the thermal energy of automobile exhaust in the form of electric energy. Skutterudite based thermoelectric materials for high temperature use and existing thermoelectric materials for low/middle temperature use were improved in performance, and a dimensionless thermoelectric performance index of ZT=1 was attained. Advanced processes were applied for improvement on the performance of existing thermoelectric materials. In the effort to develop technologies for the mass production of thermoelectric materials for high temperature use, a material manufacturing process was established for manufacturing materials excellent in thermoelectric and mechanical properties using a method for mass-producing sinterable materials by gas atomization and a large discharge plasma sintering process capable of treating large specimens. In the effort to improve automobile power generation modules in performance and to establish element technologies for their manufacture, technologies were developed involving thermoelectric materials and electrodes, bonding of different thermoelectric materials, bonding of heat conducting electrical insulators and electrodes, and high efficiency segment type power generation modules. A high performance automobile exhaust gas heat exchanger was developed. A Co-Sb based thermoelectric module and a Bi-Te based module were combined and the package was tested aboard automobiles, when a maximum power output of 83W was achieved. It is necessary to review module arrangement. (NEDO)

  2. Fiscal 2000 feasibility research on environmentally friendly coal utilization system. Seminar holding project (China: Zaozhuang, Yanshan, Jianshan, Jinzhou); 2000 nendo kankyo chowagata sekitan riyo system kanosei chosa hokokusho. Seminar kaisai jigyo (Chugoku Zhaozhuang, Yanshan, Jianshan, Jinzhou)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Seminars were held in China for the delivery of reports on the results of model projects with a view to popularizing the results of the clean coal technology model projects, which had been completed, for the purpose of contributing to the improvement on coal utilization technology and to the enhancement of environmental protection. The seminars took place at the sites of demonstration model projects just completed in China, namely, Zhejiang Huba Corporation (low-grade coal combustion system); Chaili Colliery, Zaozhuang Coal Mining Administration (CFBC - circulating fluidized bed combustion); Jinzhou Heat Power General Co., Ltd. (CFBC); and Beijing Yanshan Petrochemical Corporation (desulfurizing agent-added coal-water mixture system). At each of the project implementation sites, lectures were given on technical matters, technical know-how was exchanged, and study tours were organized to facilities concerned, which meant to promote the diffusion of the related technologies throughout China and, eventually, to contribute to the enhancement of environmental protection. The main subjects at the seminars included the introduction of GAP (green aid plan) projects in China, introduction of the outlines of technologies related to the model projects, verification and achievements, latest trends, and measures for the diffusion of the technologies. Study tours were made, and videos were shown relating to the local conditions. Every one of the seminars was successfully attended by 60-70 participants. (NEDO)

  3. FY 2000 report on the results of the joint research - Field test project on the photovoltaic power generation for public facility use; 2000 nendo kyodokenkyu gyomu seika hokokusho. Kokyo shisetsu you taiyoko hatsuden field test jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-05-01

    The paper arranged the FY 2000 results of the field test on the photovoltaic power generation for public facility use, etc. This report described in detail the results obtained at 237 places including the following: Social Welfare Corp. Seimei-kai, Kobe City (Hyogo Prefecture), Iitaka Town of Iinan County (Mie Prefecture), Kyushu Electric Safety Association, Educational Corp. Kongo Gakuen, Social Welfare Corp. Izumi-kai, Educational Corp. Shiobara Ikuei-kai, Educational Corp. Aiko Gakuen, Social Welfare Corp. Tachibana-kai, Cooperative Association Co-op Kobe, Social Welfare Corp. Hoshizuki-no-sato, Tochigi-Fuji Industrial Co., Hirabayashi Section of Gamo Town of Gamo County (Shiga Prefecture), Yanagawa City (Fukuoka Prefecture), Imadate City of Imadate County (Fukui Prefecture), Osaka Prefecture, Yamanashi Prefecture, Utazu Town of Ayauta County (Kagawa Prefecture), Educational Corp. Fukuyama Gakuen, New Energy Business Cooperative Association, Meitec Corp., Shikoku Medicom Co., Shizen Kobo Co., Educational Corp. Horikoshi Gakuen, Matama Town of Nishi-Kunisaki County (Oita Prefecture), Nio Town of Mitoyo County (Kagawa Prefecture), Educational Corp. Koshien Gakuin, Sansei Giken Co., Mitsui Greenland Co., AWI Mach Co., Nagoya City and Educational Corp. Kibogaoka Gakuen. (NEDO)

  4. FY 1999 report on the results of the joint study - project on the industry use photovoltaic power generation field test. 2/3; 1999 nendo sangyonadoyo taiyoko hatsuden field test jigyo kyodo kenkyu seika hokokusho. 2/3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    In the field test, solar cell panels were installed on rooftop, and inverters were installed indoors. The electric power generated was connected at high pressure with electric installation of facilities and was also supplied to power equipment, lighting, air conditioning, etc. in facilities. The FY 1999 results were summarized. The installation of photovoltaic power generation facilities at 38 places and the results of the study were summarized in this report including a new public office building of Nio town, Kagawa prefecture, General Welfare Center of Matsumae town, Ehime prefecture, General Culture Center of Nakajima town, Ehime prefecture, Educational Foundation Sugao School, Training Center of Japan Railway Co., etc. (NEDO)

  5. FY1992 research report on the evaluation and analysis of data collected in fuel cell power generation field test project; 1992 nendo nenryo denchi hatsuden field test jigyo ni okeru shushu data hyoka kaiseki kenkyu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    This paper describes the achievements in fiscal 1992 in the field tests on fuel cell power generation systems. The three locations subjected to the present analysis are all installed with 50-kW systems, whereas power generation efficiency of around 35% such as 35.3, 34.2 and 34.6% was obtained when the systems were operated at the rated output. When the load gets to below a certain load band (about 30 kW), the power generation efficiency decreases proportionately with the load. The overall efficiency including heat supply was 77.8, 70.7 and 80.3% respectively at about the rated output, showing a trend that the higher the thermal efficiency, the higher the overall efficiency. The case of generating both electric power and heat simultaneously has higher efficiency than the case of heat supply alone. The contribution rate of the fuel cell as a base load was 2.8, 4.6 and 13.6%, respectively. The system with as high value as 13.6% takes a power load following type operation mode, in which power is generated during a time band with large load during weekdays, and no power is generated at nighttime and in holidays when load is smaller, playing a role of peak responding power supply. Only one trouble has occurred in an auxiliary generator in the heat recovery system. (NEDO)

  6. Fiscal 1996 research report. Basic research on energy consumption efficiency improvement for developing countries (Industry related survey for energy analysis); 1996 nendo hatten tojokoku energy shohi koritsuka kiso chosa jigyo hokokusho. Energy bunsekiyo sangyo renkan chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Inter-industry relations tables and energy statistics are combined for Asian countries for the preparation of energy analysis oriented inter-industry relations tables, which are used to metrically analyze Aisan nations' industrial structures and energy consumption structures for the ultimate purpose of grasping the magnitude of each industry's demand for energy. The tables prepared this year cover Korea, Indonesia, Thailand, and the Philippines. In Korea, the self-sufficiency rate of mineral fuels is low at 23.1%, which is due to its import of crude oil from abroad. It consumes 177.92-million tons (in terms of oil) of energy for its economic activities, with energy saving measures expected to work effectively here. Indonesia's mineral fuel self-sufficiency rate is high at 84.3% because it is an oil producing country. The energy it consumes for its economic activities is 179.37-million tons (in terms of oil), and energy saving measures will work effectively here. Thailand is a crude oil importing country. Its mineral fuel self-sufficiency rate is 33.4% and the energy its economic activities consume is 53.08-million tons (in terms of oil), and energy saving measures will work effectively in this country. The Philippines is a crude oil importing country and its mineral fuel self-sufficiency rate is as low as 4.8%. It consumes 22.71-million tons of energy (in terms of oil) for its economic activities, and energy-saving measures are expected to take effect here. (NEDO)

  7. Fiscal 1995 international research cooperation project. Report on the R and D result of the environmental harmony type combustion technology; 1995 nendo kokusai kenkyu kyoryoku jigyo. Kankyo chowagata nensho gijutsu ni kansuru kenkyu kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The research and development were conducted jointly with Europe of an environmental harmony type high efficient catalyst which enables clean combustion and NOx removal in polluted gas in combustion flue gas, etc. In the research and development of NOx removal catalyst such as zeolite base, reformation of mostly mordenite was done by ion exchange, ion implantation, skeleton element substitution, etc. A possibility was found out of applying the membrane formation method except ion implantation as reforming means. In the R and D of the complex oxide base NOx removal catalyst, it was found that the catalyst carrying copper and silver on silica and layer clay compound under optimum conditions shows peculiarly high activity, and there is little decrease in the activity, but rather increase in it even under vapor existence. An evaluation was made of NO resolution of direct resolution element carrying noble metal electrolyte on solid electrolyte, finding out that the highest NO selectivity is shown with Pd as electrolyte and at a baking temperature of about 1300degC. Development of high- and low-temperature catalysts was also made. 417 refs., 286 figs., 63 tabs.

  8. Fiscal 1996 international research cooperation project. Report on the R and D result of the environmental harmony type combustion technology; 1996 nendo kokusai kenkyu kyoryoku jigyo. Kankyo chowagata nensho gijutsu ni kansuru kenkyu kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The research was conducted jointly with Europe of a catalyst which enables clean combustion and NOx removal in polluted gas in combustion flue gas, etc. Reformation of mordenite and {beta}-zeolite was done by ion exchange, ion implantation, and membrane formation. A catalyst was searched for to obtain reducing agents, C5-C8 components, by decomposing light oil. Saponite, clay compound, showed by copper and silver ion exchanges approximately 50% of activity under 20,000h{sup -1}, C3H6 reducing agent, and without steam. The effect of the temperature of sintering on NOx selective reductionality of silver-carrying alumina catalyst was studied, and in sintering at 800degC, activity increased. When using conductive oxides like ruthenium oxide for electrolyte, NO decomposition selectivity increased. As to the functional layer carried above the Pd electrolyte, iron oxide and magnesium oxide increased NO decomposition selectivity. PdO and rare earth oxides forming compounds controlled variation of activity by dissociation/reoxidation of PdO. As to PdO/Gd203, the initial methane combustion activity was favorable, but there was seen deterioration with age. 271 refs., 281 figs., 58 tabs.

  9. Basic investigation on promotion of joint implementation in fiscal 2000. Modernization project for North Bangkok Thermal Power Plant in Thailand; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Tai North Bangkok karyoku hatsusensho kindaika jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective of saving energy and reducing greenhouse gas emission, a modernization project has been discussed on the North Bangkok heavy oil burning thermal power plant owned by Electricity Generating Authority of Thailand (EGAT). The present project plans to withdraw the existing units No. 1, 2 and 3, and install two new generating facilities with the rated output of 358.3 MW using natural gas as fuel. The present feasibility survey has performed detailed comparative discussions on four cases, whereas a proposal was selected to withdraw all of the boilers, steam turbines, and generators, and install two single axis combined cycle systems whose output has been increased by using the existing fuel tank area. The energy saving effect by this project can reduce fuel consumption annually by 514 kt of crude oil equivalent. The greenhouse gas can be reduced annually by 2,680 kt-CO2. The project will require a total fund of about 57 billion yen. The profitability assessment calls for the internal profitability of 8.413% and the investment fund efficiency of 1.69%. The economic investment payback effect of this project is determined sufficient. (NEDO)

  10. FY 1999 report on the results of the joint study - project on the industry use photovoltaic power generation field test. 1/3; 1999 nendo sangyonadoyo taiyoko hatsuden field test jigyo kyodo kenkyu seika hokokusho. 1/3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    In the field test, solar cell panels were installed on rooftop, and inverters were installed indoors. The electric power generated was connected at high pressure with electric installation of facilities and was also supplied to power equipment, lighting, air conditioning, etc. in facilities. The FY 1999 results were summarized. The installation of photovoltaic power generation facilities at 88 places and the results of the study were summarized in this report including Social Welfare Corporation Seishoen, Maruto Co., Saga Sanyo Industries Co., Koyama Cranial Nerve Surgery/Internal Medicine Hospital, Tsuchiura Urban Development Co., Osaka Alloy Works, Suntory Limited, etc. (NEDO)

  11. FY 1999 report on the results of the joint study - project on the industry use photovoltaic power generation field test. 3/3; 1999 nendo sangyonadoyo taiyoko hatsuden field test jigyo kyodo kenkyu seika hokokusho. 3/3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    In the field test, solar cell panels were installed on rooftop, and inverters were installed indoors. The electric power generated was connected at high pressure with electric installation of facilities and was also supplied to power equipment, lighting, air conditioning, etc. in facilities. The FY 1999 results were summarized. The installation of photovoltaic power generation facilities at 39 places and the results of the study were summarized in this report including a community hall of Iwade town, Wakayama prefecture, Sugihara Industrial Co., a public library of Mabi town, Okayama prefecture, Social Welfare Corporation Shofukai Aiwaen, Japan Kodo Paper Industries Co., etc. (NEDO)

  12. FY 2000 report on the investigational study of the introduction/spread of clean energy vehicles for transportation business use; 2000 nendo chosa hokokusho. Unso jigyo yo clean energy jidosha no donyu fukyu ni kakawaru chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A comparative study of the cost effectiveness in improvement of emission gas was made between the diesel particulate filter (DPF) which is studied as measures against toxic emission gas from the vehicles already sold and the compressed natural gas (CNG) vehicle which has a large number of spread among clean energy vehicles. In the trial calculation, 18 cases were set up using measures by year against diesel car emission gas, use period and annual running distance as valuables. As a result of the study, the following conclusions were obtained. At the present time, when the vehicle price dropped approximately 40% from that at the beginning of the introduction, the cost effectiveness of CNG vehicle is larger than that of diesel car with DPF. Since the unit price of natural gas is comparatively higher than that of light oil, the longer the annual running distance is, the smaller the cost effectiveness of CNG vehicle is than that of diesel car with DPF. The durability period of DPF is considered not so long, and therefore, the longer the use period is, the larger the cost effectiveness of CNG vehicle is than that of diesel car with DPF. (NEDO)

  13. Project to promote the technical development of global environmental industries. International research exchange project; Chikyu kankyo sangyo gijutsu kaihatsu suishin jigyo. Kokusai kenkyu koryu jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Exchanges with researchers/research institutes in overseas countries have an important meaning in promoting the research and development toward the creation of new research fields where the solution to the environmental problem is aimed at and toward the construction of new technological systems. Therefore, under the cooperation of Research Institute of Innovative Technology for the Earth (RITE), and RITE related researchers and societies, given were invitation and dispatch of researchers to international conferences and symposia involved in the global environment related technology, and exchanges with major overseas research institutes/universities. At the same time, based on the short-term invitation and dispatch so far given, a system was established for medium- and long-term dispatch/invitation of researchers who are thought to hold an important position in the future research activities. From the results obtained, domestic and foreign exchanges relating to the latest research could be promoted. In addition, researches in the basic domain related to the global environmental technology were advanced in a variety of fields overseas. The numbers of invitation and dispatch given in fiscal 1995 were 12 and 13, respectively, the results of which were included in this paper. 121 refs., 74 figs., 11 tabs.

  14. FY 2001 report on the survey of the formation promotion subsidy project on the environmentally friendly type energy community. Potential survey of the introduction of a processing/power generation system using ASR in the South region of Tochigi Prefecture; 2001 nendo kankyo chowa gata energy komyuniti keisei sokushin hojo jigyo. Tochigi ken nanbu chiiki ni okeru ASR (Shuredda dust) wo nenryo to shita shori hatsuden system no donyu kanosei chosa chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    For the consistent processing of waste automobile in Tochigi Prefecture and the neighboring area, survey/study were made of the thermal recycle using shredder dust, ASR (automobile shredder residue), as fuel as well as the material recycle. As to the amount of material recycle of waste automobile, the amount of potential recycle of iron, copper, plastic, etc. was estimated, and it was found out that the potential recycle of parts such as engine was 40-45%, that of iron scrap 35-40%, and that of ASR 20-25%. The amount of fuel (ASR amount) to be thrown into the gasification power generation system was set up at 150t. As the gasification power generation system, the pyrolysis gasifier and shaft kiln gasification melting furnace were selected. In the study of economical efficiency of the gasification power generation system, the following were considered: ASR processing price, plant cost, subsidy, running cost, char receiving price, power selling price, etc., but even in the case of the pyrolysis gasifier with highest valuation, both payback years and IRR did not reach the target. (NEDO)

  15. Report on the results of the FY1999 standardization for new standard interface protocol for electrical measuring use; 1999 nendo shinki sangyo ikusei sokkogata kokusai hyojun kaihatsu jigyo seika hokokusho. Denki keisokukiyo shinhyojun interface purotokoru no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The purpose of this project is to create a new protocol for electric measuring instruments that use a built-in the Universal Serial Bus (USB) interface which is no incorporated in PCs. This new interface will replace the existing GPIB interface (IEEE-488), which is currently used in electric measuring instruments as standard interface. Our goal is to create a protocol that will provide the same data rate as GPIB and better connectivity. To evaluate our new protocol, we create virtual instruments using evaluation boards for USB chips, as well as software, and performed transfer tests to isolate and solve problems found in the tests. We will make the protocol and the software available for general use, and register the protocol as a standard to the USB Developer's Forum, a body that manages USB standards, to make it as a de facto standard. Ultimately we are aiming at making it an international standard. (NEDO)

  16. Generalized report on the research cooperation promoting project. Research cooperation related to the mine waste water treatment technology utilizing biotechnology; Kenkyu kyoryoku suishin jigyo sokatsu hokokusho. Bio riyo ni yoru kohaisui shori gijutsu ni kansuru kenkyu kyoryoku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This paper is a generalized report in relation with the mine waste water treatment technology utilizing biotechnology, from among the promotion projects for research cooperation with China. Ferric iron (Fe{sup 3+}), which precipitates at low pH, is produced by utilizing bacteria which derives energy from oxidizing ferrous iron (Fe{sup 2+}) in the waste water, and the iron is precipitated and removed by using low-cost calcium carbonate as a neutralizing agent. Joint researches and developments have been carried out on selection of optimal kinds of bacteria, cultivation of bacteria oxidizing iron at high efficiency, optimal removal system of heavy metals in mine waste water, and recovery of useful resources. Japanese engineers were sent to sites in China, Chinese researchers were received in Japan, and pilot plants were operated and studied. For the purpose of proliferating and enlightening the result of the project, a seminar was held in Beijing in February 1998. In order for the achievements derived up to fiscal 1998 to be used in diverse fields, fiscal 1999 will carry out follow-ups, including assistance, for the voluntary researches performed by China. The follow-ups will also include confirmation on the state of testing the iron oxidizing bacteria technology, technical guidance, and analyses and discussions on the data. (NEDO)

  17. FY 2000 report on the results of the project to promote the comprehensive management of petroleum products. Development of a risk assessment system; 2000 nendo sekiyu seihin sogo kanri suishin jigyo seika hokokusho. Risk hyoka system kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The R and D were conducted on the system to assess risk of chemicals which considers the human health, environment, etc., and the FY 2000 results were reported. In this fiscal year, the goal of the study was to establish a system of user-friendly interface, easy-to-use system components and data access methodology. As to the details of the system, additional assessment items on the human health were found and surveyed, and the development of a new system for the assessment of acute exposure was started. Relating to the handling of various data on toxicity, physical properties, etc., reference is to be made to the database of National Institute of Technology and Evaluation, MITI, as a base. Concerning the simple assessment corresponding to the PRTR method, almost all 435 chemicals designated by the PRTR act were to be included in the internal database. As to the development of the system, the simple assessment system corresponding to the PRTR method was developed, and a testing system, {beta} version, was completed. Further, the development of a 'site-specific assessment system' was started which considers the geological/meteorological situation of the site. (NEDO)

  18. Basic project on the cooperation in enhancement of the international energy consumption efficiency. Survey of energy conservation potential by industry; 2000 nendo kokusai energy shohi koritsuka chosa nado kyoryoku kiso jigyo hokokusho. Gyoshubetsu sho energy potential chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of looking for measures to promote the effective energy conservation in China, the potential energy conservation amount in general plants was surveyed and analyzed by industry. Activities were made in the following fields: 1) survey of the actual state of energy in main industries; 2) energy conservation potential in the cement industry in China; 3) energy conservation potential in thermal power plants in China. In 1), survey was made on 8 industries including the iron/steel industry and oil refining industry. In 2), survey was made of the actual state of the Liulihe cement plant and Shitou cement plant. The subjects extracted were the arrangement of instrumentation equipment such as the exhaust gas analyzer needed for combustion management, improvement of the air/fuel ratio of kiln, enhancement of cooling efficiency of clinker cooler, etc. In 3), the actual state of the Qinling power plant was surveyed, and it was made clear that high efficiency of 38% or more can be maintained if the appropriate use/maintenance management is made (coal unit consumption: 383g/kWh in Qinling and 309g/kWh). (NEDO)

  19. Report on the FY 1998 geological structure survey. North Hay Gulch area, State of Colorado, the U.S.; 1998 nendo kaigaitan kaihatsu kanosei chosa hojo jigyo chishitsu kozo chosa hokokusho. Beikoku Colorado shu North Hay Gulch chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    Test boring at 21 places and core sampling were conducted during September-November 1998 along the ridge to the west of Hay Gulch and in the direction crossing the northwest of the drainage canal and National King Coal Mine (NKC coal mine). It was found that A layer which NKC coal mine is now drilling is the upper part of A coal seam where the seam bifurcates. The boundary to the west of the thick A coal seam is not clear, and there is a possibility that more reserve from the thick coal seam and single seam exists toward Cherry Creek. In the existing coal drilling area, the lower A seam existing under the upper A seam becomes thin rapidly, and the seam thickness becomes less than 1 foot. The average thickness of thick coal seams is 9.9 feet, and the area is 780 acres along the ridge. The upper A coal seam except the above is 5.5 feet in average seam thickness and 910 acres in area. The reserve is 23 million tons. As to the quality of thick coal seam, the average heating value is 7,089 kcal/kg, sulfur content 0.68%, and ash content 7.50%. As coal drilling conditions, the same level as or higher than those of NKC coal mine is expected. (NEDO)

  20. FY 2000 report on the results of the project to promote the comprehensive management of petroleum products. Development of a risk assessment system; 2000 nendo sekiyu seihin sogo kanri suishin jigyo seika hokokusho. Risk hyoka system kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The R and D were conducted on the system to assess risk of chemicals which considers the human health, environment, etc., and the FY 2000 results were reported. In this fiscal year, the goal of the study was to establish a system of user-friendly interface, easy-to-use system components and data access methodology. As to the details of the system, additional assessment items on the human health were found and surveyed, and the development of a new system for the assessment of acute exposure was started. Relating to the handling of various data on toxicity, physical properties, etc., reference is to be made to the database of National Institute of Technology and Evaluation, MITI, as a base. Concerning the simple assessment corresponding to the PRTR method, almost all 435 chemicals designated by the PRTR act were to be included in the internal database. As to the development of the system, the simple assessment system corresponding to the PRTR method was developed, and a testing system, {beta} version, was completed. Further, the development of a 'site-specific assessment system' was started which considers the geological/meteorological situation of the site. (NEDO)

  1. FY 2000 report on the results of the survey of the project for implementation of 'The New Earth 21'; 2000 nendo 'chikyu saisei keikaku' no jisshi keikaku sakusei ni kansuru chosa jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    As the research study contributing to implementation of 'The New Earth 21' proposed by Japan at the Houston Summit in 1990, a DNE21 model was developed as a quantitative assessment model for global warming preventive technology, heightening of efficiency of the global energy supply/demand system, conversion to energy sources of low carbon emissions, etc. In the project of 'The New Earth 21,' economy and environment can be compatible centering on developed countries' technical development and technology transfer to developing countries. In FY 2000, for heightening applicability of the DNE21 model, the world, which was used to be divided into 10 regions, was divided into 54. At the same time, a prototype model was constructed in which cities in the region were divided into three cities: large; medium; small. Using the DNE21 model, evaluation was made of effects of uncertainties such as population, economic growth, final energy demand and cost as preconditions of the model on the optimization of global warming preventive measures. Further, technologies which are expected to be important for global environmental policy in the ultra-long term were listed up to estimate the potentiality. (NEDO)

  2. FY 2000 Project of developing international standards for supporting new industries. Standardization of systems for detecting gene recombination products; 2000 nendo shinki sangyo shiengata kokusai hyojunka kaihatsu jigyo seika hokokusho. Idenshi kumikae seihin kenshutsu system no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Described herein are the FY 2000 results of the studies on the basic conditions for gene recombination products, and methods of determining content of the purchased gene recombination products in agricultural products, conducted to promote the standardization of the gene recombination product detection systems. Soybean is taken up as the gene recombination product to be studied, in which the samples containing the gene recombination product at 5, 0.5, 0.1 and 0% are prepared, and qualitatively analyzed by the DNA extraction and PCR method. No band is detected. For the quantitative examination by the real-time PCR method, the SYBRGeen, Taqman and hybridization probe methods are used to study the PCR conditions. The sample DNA extracted by the DNA Extraction kit for GMO Detection Ver.2 from the sample containing the RoundupReady{sup TM} soybean is quantitatively analyzed by the real-time PCR method for GMO content, which has produced the results for promotion of the standardization. (NEDO)

  3. Fiscal 1999 international energy conservation model project. Report on result of demonstrative research concerning cement clinker cooling system; 1999 nendo kokusai energy shohi koritsuka nado model jigyo seika hokokusho. Cement clinker reikyaku sochi ni kakawaru jissho kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing energy consumption and CO2 discharge in a cement plant in Indonesia, R and D was conducted on new clinker cooling system, high performance kiln combustion system, and technology for steady kiln operation and control, with the fiscal 1999 results reported. In the research on the optimum clinker cooling system, a new type clinker cooling system (CCS) was developed in which air beams are applied only to stationary grate rows, in an air beam type clinker cooling system where cooling air is fed to each block, with grate plates used as the air duct. This year, in an actual machine testing equipment (capacity 2,500 t/d), the whole heat recuperation area was modified for the CCS, with the operation started since February, 1999, aiming at the optimal clinker cooling effect and high heat recovery efficiency. The heat quantity for the entire system showed a decrease of 60 kcal/kg in the heat consumption rate through CCS modification, kiln burner adjustment, etc. So long as the demonstration plant is concerned, design of a new type burner and study/design for the kiln stabilization were nearly completed. (NEDO)

  4. FY 2000 report on development of the infrastructure to promote use of fuel cells for automobiles. Standardization of FCEVs; 2000 nendo nenryo denchi fukyu kiban seibi jigyo jidoshayo nenryo denchi fukyu kiban seibi seika hokokusho. FCEV hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Described herein are the results of the FY 2000 activities for standardization of fuel cell powered vehicles and development of the infrastructures related to participation in ISO. Fuel cell powdered vehicles are believed to be the most favored vehicles of the next generation for their low emissions and fuel efficiency. The world leading automakers, including Japanese makers, have announced plans to commercialize these vehicles in 2003 to 2004. Under these situations, the discussion has been initiated to move forward standardization of the fuel cell powdered vehicles at the international conferences, e.g., ISO (International Standardization Organization) and IEC (International Electrotechnical Commission). At ISO/TC22/SC21 (Electric Vehicles) for which the Japan Electric Vehicle Association (JEVA) is in charge as the domestic council, the proposal has been made and approved to begin working towards the standardization at the conference in November 1999. Consequently, FCEV special subcommittee consisting of public organizations (including academic organizations and Ministry of Economy, Trade and Industry), automakers, automotive parts manufacturers and other organizations related to the automotive industry has been established in February 2000 under the JEVA standardization section and started the activities. The Japanese proposals for safety and fuel cell vehicle terminology will be presented to the ISO meetings to be held in May 2001 in Tokyo. (NEDO)

  5. FY 2000 report on the basic survey to promote the joint implementation. Project on the repair of the Bobovdol thermal power plant, Bulgaria; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Bobovdol karyoku hatsudensho kaishu jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    As to the Bobovdol thermal power plant, Bulgaria, a plan for repair of power plant was worked out with the aim of energy conservation and greenhouse effect gas emissions, and the results of the feasibility study were reported. The existing power plant, 3 x 210MW unit, totals 630MW, approximately 130,000 hours in cumulative operation hour. In the repair plan, the plant is replaced with high efficiency gas combined cycle power generation facilities based on gas turbines by scrap and build. In the plan, the repair of existing units Nos. 1 and 2 for life elongation is urgently conducted, and new facilities are to be built every 5 years. As a result of the study, the energy conservation effect will be reduced by 16.37 million toe tons in 41 years after the repair, and the CO2 emission will be reduced by 105.18 million tons in 41 years after the repair. As to the profitability, the internal economical profitability is 5.66% in case of setting the CO2 emission trade at zero. This is the level on which the project is barely profitable by soft loans raised by Japan Bank for International Cooperation (JBIC), etc. (NEDO)

  6. FY 2000 report on the promotion projects by Research Institute of Innovative Technology for the Earth. Study on possibility of research exchanges; 2000 nendo chikyu kankyo sangyo gijutsu kaihatsu suishin jigyo seika hokokusho. Kenkyu koryu kanosei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Described herein are the results of the study on possibility of research exchanges, conducted by Research Institute of Innovative Technology for the Earth (RITE) in FY 2000. For development of thin-film catalysts, HTE, a venture developing combinatorial chemistry application to catalysts, is a potential partner for the exchanges. One of the technical problems involved in underground sequestration of CO2 relates to evaluation of the reactions between CO2 injected under pressure and the surrounding rocks. It is a less site-specific theme, and preferably pursued through international networks. The RITE delegates have visited the British Geological Survey, Canada's Alberta Research Council, and US's Pennsylvania State University, Rice University and Chevron Petroleum, finding research exchange possibilities in all of these organizations for broad technical themes related to underground sequestration of CO2. For energy conversion technologies using biomass resources as the source materials, the potential partners for the research exchanges include Swedish Royal Institute of Technology, Belgium's Catholic University of Louvain and Spain's University of Zaragona which leads researches in production of gases from wastes and biomass. (NEDO)

  7. Fiscal 1996 survey report. Data collection and evaluation analysis in the project on field tests on the fuel cell generation; 1996 nendo kenkyu hokokusho. Nenryo denchi hatsuden field test jigyo ni okeru data shuyaku oyobi hyoka kaiseki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The paper installed fuel cell power generation equipment experimentally at various facilities which are the final diffusion form of the new energy power generation, conducted long-term operation under the actual load, collected/analyzed various data, arranged them as data useful for full scale introduction/diffusion, aiming at forming the base for general diffusion of the fuel cell power generation. The number of the systems installed for field test execution has been 24 places/28 units since the start of the project, and the system capacity totaled 4,250kW. The actual operation hours in five years are 6,000-28,000. In fiscal 1996, the average cumulative accumulated operational rate was approximately 68%, a little over that in fiscal 1995, 65%. The average load factor was 69% in fiscal 1995 and 70% in fiscal 1996. The utilization rate increased as a whole to about 57% on average if seeing only fiscal 1996, as compared with that in fiscal 1995, about 48%. The power generating efficiency was approximately 34% on average. As to the status of shutdown of the fuel cell power generation, the paper surveyed the average interval of failure, the rate of frequency of shutdown, the analysis of shutdown, etc. 250 figs., 29 tabs.

  8. Report on the database structuring project in fiscal 1996 related to the 'surveys on making databases for energy saving (2)'; 1996 nendo database kochiku jigyo hokokusho. Sho energy database system ka ni kansuru chosa 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    With an objective to support promotion of energy conservation in such countries as Japan, China, Indonesia, the Philippines, Thailand, Malaysia, Taiwan and Korea, primary information on energy conservation in each country was collected, and the database was structured. This paper summarizes the achievements in fiscal 1996. Based on the survey result on the database project having been progressed to date, and on various data having been collected, this fiscal year has discussed structuring the database for distribution and proliferation of the database. In the discussion, requirements for the functions to be possessed by the database, items of data to be recorded in the database, and processing of the recorded data were put into order referring to propositions on the database circumstances. Demonstrations for the database of a proliferation version were performed in the Philippines, Indonesia and China. Three hundred CDs for distribution in each country were prepared. Adjustments and confirmation on operation of the supplied computers were carried out, and the operation explaining meetings were held in China and the Philippines. (NEDO)

  9. Fiscal 2000 report on geothermal energy development promotion survey. Phase 1. Report on environmental impact survey in No. C-5 Appi district (Weather); 2000 nendo chinetsu kaihatsu sokushin chosa hokokusho. No.C-5. Appi chiiki - kankyo eikyo chosa (kisho) dai 1 ji

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    For grasping the characteristics of weather, climate, and natural earthquakes in and around the geothermal survey area in the Appi district, Iwate Prefecture, observation data of weather stations or the like in the neighborhood were collected and put in an easy-to-use order. Weather and earthquake data of the 1990-1999 decade were collected and subjected to statistical processing. Weather in the Appi District Survey C area is characterized in that it assumes the Japan Sea side pattern with much snow in winter and much rain in the rainy season. In the other seasons, however, it assumes the Pacific side inland pattern. Weather data in the Appi district and its vicinity are deemed to be similar to the values observed at the Hachimantai weather station. The area covered by the survey, however, is higher than the Hachimantai weather station by 400-900m, and therefore is that much colder and has more rain and snow. As for earthquakes, a total of 647 were recorded in the decade 1990-1999. In the Appi District Survey C area, which is approximately 20km times 20km large, suffered 31.1 events/month in 1998, which indicated a great rise in seismic occurrence. The rise is now attributed to the volcanic activity of Mt. Iwate which is deemed to be waning. (NEDO)

  10. Report for fiscal 2000 on electronic patient record network discussion committee. Survey on promotion of medical information use utilizing electronic patient record network; 2000 nendo denshi karute network kento iinkai hokokusho. Denshi karute network wo katsuyoshita iryo johoka no sokushin ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Based on the movements in the most advanced IT technologies and in social system reformation in the medical and health preservation fields, discussions were given on the assignments and measures to be solved to realize the medical information network, and the secondary utilization method of the medical information and the assignments and measures in the utilization thereof. A patient record is originally a document stating the secrets of a patient for his or her medical information, and has a nature that doctors may be sued from the patient if they disclose or exchange the document. There is a large number of company owners, politicians or salaried people who would not want their diseases which they had in the past, the name of the existing disease and medical treatment to be made public. The electronic patient record network has a conflicting proposition to elevate its values by means of data re-utilization, secondary utilization and information exchange. Preparation of the database requires multilateral analyses and classifications, as well as sufficient discussions and realistic execution including the consistency with the personal information protection law, as to whether it is information that the patient wants the exchange or disclosure, or whether it is information to be exchanged or disclosed even if the patient refuses it, not speak of attention to 5W1H. (NEDO)

  11. Fiscal 1998 investigation of geothermal development and promotion in Akinomiya area survey. Report on exploratory drilling/well survey and incidental work (1/2); 1998 nendo chinetsu kaihatsu sokushin chosa Akinomiya chiiki chosa hokokusho. 1/2. Shisui kussaku koji kosei chosa oyobi futai koji

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    Exploratory drilling and well survey were conducted, for the purpose of grasping underground geological structure, temperature and physical properties of Akinomiya area, Akita prefecture, as a part of fiscal 1998 investigation of geothermal development and promotion. The exploratory drilling well N10-AY-6 was excavated to the depth of 1,701 m. This well had a small lost circulation of about 4.2 kL/h at the end of drilling; hence, pressurized water injection was carried out for the purpose of enhancing the performance as a reducing well, resulting in an improvement to 21.6 kL/h. The well N10-AY-7 was in the bedrocks of the Old Tertiary system at the depth of 492 m or deeper, which revealed that the Old Tertiary bedrocks lay more shallowly than expected. At the depth of 1,900 m, the maximum temperature showed 223.3 degree C. In a temperature recovery test, it climbed to 277.2 degree C at the depth of 1,400 m. In the well N10-AY-8, the Old Tertiary bedrocks were found drilled at the depth of 87 m or deeper. Inside well temperatures at the time of temperature recovery test showed nearly the same degrees from the depth of 880 m to 1,090 m or about, thereafter rising until the depth of 1,330 m, further rising from 1,370 m until the bottom of the well, and showing the maximum temperature of 277.0 degree C at the depth of 1,450 m. (NEDO)

  12. New energy vision for Nomura town. Fiscal 2000 survey report on regional new energy vision formulation project for Nomura town, Ehime Prefecture; Nomuracho shin energy vision. 2000 nendo Nomuracho chiiki shin energy vision sakutei nado jigyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    An effort is being exerted to build a town which will generate but a little environmental impact, with symbiosis with nature established as the highest priority target of the town administrative activities. Under the Nomura town new energy vision, a basic policy and measures are established toward the promotion of new energy introduction, with local features, existence of new energy resources, and the feasibility of new energy adoption taken into consideration. Surveys were made and the results are compiled into seven chapters, which involve (1) the trend of new energy, (2) local features, (3) existing amount and available amount of new energy, (4) basic policy toward the introduction of new energy, (5) main projects for the introduction of new energy, (6) details of the basic policy toward the introduction of new energy, and (7) the Nomura Town Deliberation Committee on New Energy Vision Formulation. Chapter (6) covers the assessment of new energy introduction feasibility, promotion of concretized introduction projects, public relations/enlightening/popularizing activities, and assistance for new energy introduction. Studied for introduction are photovoltaic power generation, solar heat utilization, wind power generation, biomass power generation, and the like. (NEDO)

  13. Fiscal 1999 technical survey report. Model project implementation feasibility study in India on effective utilization of blast furnace gas pressure energy; 1999 nendo Indo ni okeru koro gas atsuryoku energy yuko riyo model jigyo jisshi kanosei chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    From the viewpoint of energy utilization stated above, blast furnace top pressure recovery turbine (TRT) unit installability was studied at Bhilai Steel Works of Steel Authority of India, Ltd., Bokaro Steel Works of Steel Authority of India, Ltd., and Visakhapatnum Steel Works of Rashtriya Ispat Nigem. The energy consumption rate at an Indian steelmaking plant is 8Gcal/t-steel, which is larger than 5-6Gcal/t-steel of Japan and therefore needs improvement. Out of the blast furnaces in India, 26 are larger than 1,000m{sup 3}, and two of them are provided with a TRT device of now-defunct Soviet Union manufacture. The blast furnaces were examined for pressure at the top, amount of gas at the top, amount of dust, and safeness in operation. The No. 2 blast furnace of the Borkaro plant was selected for the project, and studies were made for a wet type TRT device. Improvements to be achieved by TRT device installation were calculated to be a TRT output of 5,900kW, power output of 49,100MWh/year, saved crude oil amount of 12,990toe/year, and CO2 reduction of 40,200 tons-CO2/year. (NEDO)

  14. Report on the wind power development field test project in the off-shore park in Daitocho Town in fiscal 1997. System design; 1997 nendo Daitocho kaiyo koen nado ni okeru furyoku kaihatsu field test jigyo hokokusho. System sekkei

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This paper reports the wind power development field test project in the off-shore park in Daitocho Town in Shizuoka Prefecture. The annual average wind velocity was 4.2 m/s (at height of 20 m above the ground), where the facility utilization rates for 300 and 500 kW class plants were 15.1 and 16.7%, respectively. Both of the annual average wind velocity and the facility utilization rate do not meet the criteria established by NEDO. Although the location is adjacent to the Natural Park, there is no restricting condition for installation. The substation to which system linkage is to be performed is the Daito substation 3 km north of the planned location. The major load is the Daito Spa in the park facility. Ground bed at depth of 5 m will be used as the windmill foundation supporting bed. There is little electromagnetic wave hazard. The location is 380 m away from the nearest residential house, presenting no windmill noise problem. The amount of power to be generated was assumed 281,000 kWh. Specifications for nine models of 300-kW class windmills that can be introduced into Japan were discussed to select a model. The project cost was calculated to be 128.5 million yen. The construction cost will be 428,000 yen and the power generation cost 38.1 yen/kWh. Its economy is poor when the current unit price for surplus power purchase is considered, but the effect of enlightenment may be expected. (NEDO)

  15. Survey report for fiscal 1999. Evaluation and analysis on items applied for in high-performance industrial furnace introduction field test project in fiscal 1999; 1999 nendo koseino kogyoro donyu field test jigyo chosa hokokusho. Obo anken hyoka bunseki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper describes comprehensive evaluation and analysis mainly on the 51 items adopted in the high-performance industrial furnace introduction field tests. The development of a high-performance industrial furnace has completed the fundamental development research in fiscal 1998, and the possibility was verified on energy saving of more than 30% and reduction of NOx emission by 50% over that by conventional furnaces. Upon this fundamental achievement, the field test project has started as the comprehensive approach to developing the practically usable technologies for three years from fiscal 1998 until fiscal 2000, which is being promoted as a joint research project. According to the survey on the actual state in fiscal 1998, a little less than 20,000 industrial furnaces having combustion capacity of more than 500,000 Kcal/hr (excepting boilers) are being used. If these furnaces are converted into the high-performance industrial furnace, energy conservation of 210,000 x 10{sup 6} Mcal (converted to crude oil of 22.7 x 10{sup 6} kl/year) can be achieved from the maximum annual energy consumption of 700,000 x 10{sup 6} Mcal (converted to crude oil of 75.7 x 10{sup 6} kl/year). This conservation amount corresponds to about 12% of the final energy consumption in the whole Japanese industrial departments in fiscal 1996. It is expected that the performance of the full-size high-performance industrial furnace will be verified, and this technology will be promoted for wide proliferation. (NEDO)

  16. FY 2000 Project of developing international standards for supporting new industries. Comprehensive study for promotion of the international standardization; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Kokusai hyojunka suishin ni kakawaru hokatsuteki chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    This project studies the schemes for the international standardization, trends of the international standardization by the international standardization organizations and related organizations, and activities for the international standardization by the enterprises in the advanced countries, among others, in order to promote the international standardization for the 8 research and development themes. These themes are SMIL (synchronized multimedia integration language) tag standard of the three-dimensional image data, based on MXL; systems for detecting gene recombination products; methods for testing mileage of gas-fueled automobiles; measurement of multi-colors; testing/evaluation methods for highly coherent lasers; methods of evaluating optical performance of microlenses for optical information processing; recycled CFRPs; and devices for measuring marine environments. The study results indicate that progress of the development of the international standardization of the advanced technologies can be followed by investigating the characteristics of the ISO publications; ISO is studying the business plans being developed by each TC, in order to improve market adaptability of the international standards; and the European countries add conditions for standardization when the research and development themes are contracted. (NEDO)

  17. International Symposium for the Promotion of APEC Environmental Technology Exchange; APEC kankyo gijutsu koryu sokushin symposium

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-11

    The International Symposium for the Promotion of APEC Environmental Technology Exchange was held under the theme `The function and role expected of the APEC Virtual Center,` with the objectives of clarifying the need for future intra-regional environmental technological exchange, defining the types of information and personnel exchange, and promoting the use of interactive character of the APEC Virtual Center for Environmental Technology Exchange by encouraging access to and participation in the Virtual Center project. It was held in the period of 11th and 12th, November in 1996, at the venue of Rinku International Convention Center in Osaka. The symposium was attended by 477 persons from nine countries, i.e., Australia, Canada, China, Indonesia, Korea, Philippines, Thailand, the US, and Japan, comprising staff members of intra-regional environment-related organizations. After the keynote speech, `Current status and tasks of environmental technology exchange`, and `Expected roles of the Virtual Center for Environmental Technology Exchange` were discussed. During the plenary session, the chairman summarized the symposium. This summary was carried on the Virtual Center homepage of the Internet

  18. Programs for promoting new energy introduction into Wakkanai City; Wakkanaishi shin energy donyu sokushin keikaku keikakusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The average temperature in the summer season at Wakkanai is 19 degrees C, and below zero degrees C in the winter season. Solar radiation duration is shorter in November through February due partly to the presence of snow. In terms of total solar radiation amount, the city occupies a middling position in the whole Hokkaido island. As for the force of the wind, a daily maximum wind velocity of 10m/s or stronger occur on 8 to 10 days every month in the period October through May. As projects for promoting new energy introduction, the below-named ones are chosen and subjected to examination for feasibility. They are a wind power generation system for a water purification plant; a district heating system utilizing cogeneration at the city middle sector; a hybrid system of methane fermentation and wind power generation for a public stock-rearing farm; a hybrid system of cogeneration and photovoltaic power generation for Fujimi district accommodation facilities; and photovoltaic power generation as a clean energy introduction system for a general gymnastic hall of Wakkanai City. Since the above-named subjects are all excellent in economy and environmentally-friendliness, it is suggested that efforts be exerted to realize them. (NEDO)

  19. Report on the survey of the project on the environmentally friendly type energy community field test. Separate volume - reference data. Investigative project for development and commercialization of recycle technology of waste edible oil; 2001 nendo kankyo chowa gata energy community field test jigyo chosa hokokusho. Hai shokuryo yu no recycle gijutsu kaihatsu to jitsuyoka no tameno chosa jigyo (Bessatsu - Sanko shiryo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-06-01

    For the purpose of promoting the effective utilization of biomass resource, an investigative study was made on the development of recycle technology of waste edible oil. In the survey, the following were carried out and the results were summarized: promotion measures for biodiesel oil by the EU, promotion measures for biodiesel oil by other countries including Canada, promotion measures for biodiesel oil by the US's Department of Energy (DOC), actual results of the use of biodiesel oil in Kyoto City, reference data on biodiesel oil in Japan, and tackling toward the promotion of BDF in the Ministry of Agriculture, Forestry and Fisheries. As to the transportation use fuel in the EU in the coming 20 years, biofuel, natural gas and hydrogen seem to be selected. If measures are positively taken, biofuel is expected to be 2%, 6%, 7% and 8% in FY 2005, FY 2010, FY 2015 and FY 2020, respectively. Also, natural gas is expected to be 2% in FY 2010, 5% in FY 2015 and 10% in FY 2020, and hydrogen is expected to be 2% in FY 2015 and 5% in FY 2020. (NEDO)

  20. FY 1996 report on the basic survey project on the enhancement of energy efficiency in developing countries - database construction project. Volume 1. Outline of the survey and collection of the data to be included in database; 1996 nendo hatten tojokoku energy koritsuka kiso chosa jigyo (database kochiku jigyo) hokokusho. 1. Chosa no gaiyo oyobi database ni shurokusuru data no shushu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Following the previous fiscal year, construction/study of database were carried out with the aim of energy conservation for 8 countries: Japan, China, Indonesia, the Philippines, Thailand, Malaysia, Taiwan and Korea. In the study of the items of the data included, the 192 data extracted in conceptual design were re-classified into 6 large-groups and 91 medium-groups. As to the data collection, in A group countries, counterparts were requested to collect data, and 1342-1740 data were newly collected. In B group countries, Mitsubishi Research Institute, Inc. mostly collected 957 new data in Thailand, 814 data in Malaysia and 1312 data in Japan in cooperation with research institutes and investigating organizations in each country. In C group countries, 169 and 317 common data items were collected in Vietnam and India, respectively. Relating to plans for database promotion, as a result of the study with each country, 16 measures for promotion were extracted in terms of the leveling-up of NEDO-DB recognition, education of the use method, training of the operation method, etc. (NEDO)

  1. Fiscal 1998 intellectual infrastructure project utilizing civil sector functions. Research and development project on prompt-effect type intellectual infrastructure creation (Buildup of base for thermophysical property data for new industry creation); 1998 nendo minkan no kino wo katsuyoshita chiteki kiban jigyo seika hokokusho. Sokkogata chiteki kiban sosei kenkyu kaihatsu jigyo (shinki sangyo sosei no tame no netsubussei data ni kansuru kiban seibi)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For promoting the creation of new industries, thermophysical data on high-temperature molten bodies, liquid substances, solid materials, and the like were collected, and further measurements were performed; the data were stored in distributed databases; and databases were also developed about access to the Internet. In the study of the thermal properties of high-temperature molten bodies, data were collected from technical literature concerning molten silicon for semiconductor production, that is, 2 about thermal diffusivity, 4 about viscosity index, 30 about surface tension, 8 about density, and 6 about emissivity; and, concerning potassium niobate, 6 about density, 4 about surface tension, and 5 about viscosity index were collected. Thermal properties were measured for molten silicon and molten carbonates. In the study of thermal properties of fluids, data such as PVT (pressure, volume, temperature) values, boiling point pressure, saturated liquid density, isothermal compressibility, cubical expansion coefficient, surplus mol volume, and the like were collected again from technical literature concerning trifluoroethanol and its water solution. Thermodynamic properties of the aqueous ammonia solution comprised of equimolecules were measured. (NEDO)

  2. Report on the survey of the project on the environmentally friendly type energy community field test. Separate volume - reference data. Investigative project for development and commercialization of recycle technology of waste edible oil; 2001 nendo kankyo chowa gata energy community field test jigyo chosa hokokusho. Hai shokuryo yu no recycle gijutsu kaihatsu to jitsuyoka no tameno chosa jigyo (Bessatsu - Sanko shiryo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-06-01

    For the purpose of promoting the effective utilization of biomass resource, an investigative study was made on the development of recycle technology of waste edible oil. In the survey, the following were carried out and the results were summarized: promotion measures for biodiesel oil by the EU, promotion measures for biodiesel oil by other countries including Canada, promotion measures for biodiesel oil by the US's Department of Energy (DOC), actual results of the use of biodiesel oil in Kyoto City, reference data on biodiesel oil in Japan, and tackling toward the promotion of BDF in the Ministry of Agriculture, Forestry and Fisheries. As to the transportation use fuel in the EU in the coming 20 years, biofuel, natural gas and hydrogen seem to be selected. If measures are positively taken, biofuel is expected to be 2%, 6%, 7% and 8% in FY 2005, FY 2010, FY 2015 and FY 2020, respectively. Also, natural gas is expected to be 2% in FY 2010, 5% in FY 2015 and 10% in FY 2020, and hydrogen is expected to be 2% in FY 2015 and 5% in FY 2020. (NEDO)

  3. Basic research on energy conservation in developing countries. Report of the International Conference on Adaptation and Mitigation Technologies for Climate Change; Hatten tojokoku energy shohi koritsuka kiso chosanado jigyo. Kiko hendo ni kansuru tekio kanwa gijutsu kokusai kaigi hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The International Conference on Adaptation and Mitigation Technologies for Climate Change was held based on the 1st Conference of the Parties in 1995 of the United Nations Framework Convention on Climate Change, and the 2nd evaluation report of the Intergovernmental Panel on Climate Change (IPCC). This report carries the outline of this conference and minutes. Japanese government had studied the framework of activities implemented jointly (AIJ) for emission control of greenhouse gases by voluntary workers jointly with developing countries. The government decided the basis of the AIJ Japan program in 1995, and approved the evaluation guidelines of this program including confirmed and considered matters which are necessary for government offices related to this program to evaluate and approve each project. IPCC approved the 2nd evaluation report in its general meeting in 1995. This conference was thus held to discuss strategic technology and international cooperation with participation of writers of the 2nd IPCC report, policy planners of Asian countries, Japanese industries, governmental offices and NGO.

  4. Project in fiscal 2000 of developing international standards for supporting new industries. Standardization of evaluation method for gene inspection system; 2000 nendo shinki sangyo shiengata kokusai hyojunka kaihatsu jigyo seika hokokusho. Idenshi kensa system no hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Discussions and deliberations were given by the comprehensive survey committee on standardization of a total gene inspection system from specimen adjustment necessary for the gene inspection system to data processing. This paper summarizes the achievements in fiscal 2000. In standardization related to the specimen procedure and the inspection technique, the specimen storing method and the report statement contents were established. In addition, verification was made on the heat-resistant enzyme reagent and such measuring devices as the electric migration device and the photographing device. Discussions were given on standard substances used in the gene inspection. Regarding the K562 cell strain, cross-checking was performed in three institutions, wherein discussions were given on interchangeability of the inspection results, and the usefulness of the K562 cell as a standard substance. As a result, all the three institutions have come to an agreement on the Southern method, the FISH method and the RT-PCR method, but not on the real-time PT-PCR method, leaving the subject as the future assignment. In the survey for Europe and America, visits were made to AFNOR, CEN, DIN, FDA and CAP for the attempt of collecting information and establishing international exchange. (NEDO)

  5. R and D project for large industrial technologies in fiscal 1989. Report on achievements in R and D of robots for critical works; 1989 nendo seika hokokusho. Ogata kogyo gijutsu kenkyu kaihatsu jigyo. Kyokugen sagyo robot no kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    Research and development have been performed on basic technologies common to different types of robots to carry out works in critical conditions. This paper summarizes the achievements in fiscal 1989. In the R and D of sensor technologies, a prototype tri-axial one-millimeter sensor array and a signal processing device were produced and evaluations were given. A prototype production and evaluations were made on a system that can recognize comprehensively the slip, hardness, and moment as the tri-axial tactile information. In the R and D of motive force technologies, discussions were given on improvement of sensitivity of the torque sensor in the actuator for force control. Design and prototype fabrication were carried out on a speed reducer integrated actuator having a torque sensor for the manipulator's elbow joint. In addition, a force controlled controller was fabricated on a trial basis, which compensates the non-linearity of the force controlled actuator by means of software control. In the R and D of the robot languages, an application program was prepared on a representative work related to movements of a critical work robot. Verification was also conducted on the reasonability of the grammar specifications. (NEDO)

  6. Fiscal 1999 technical survey report. Model project implementation feasibility study in Malaysia on effective utilization of waste heat from paper sludge incineration; 1999 nendo Malaysia ni okeru seishi sludge nensho hainetsu yuko riyo model jigyo jisshi kanosei chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Efforts are under way to popularize practical energy conservation technologies through verification on real machines in target countries. Possibilities were studied that Malaysian paper making plants would adopt technologies of collecting heat from high-temperature exhaust gas from paper sludge incineration and of effectively utilizing the thus-collected heat. The Malaysian paper making industry produced 800-thousand tons or more in 1998, covering 72% of the total national demand. Heat recovery facilities may be installed in 15 plants. On-site surveys were made into their actual states, and then Genting Sanyen Industrial Paper Sdn. Bhd. was selected as the plant for the model project, and detailed model project feasibility studies were conducted. The studies covered the amount of wastes from paper making, their properties, treatment process, amounts of utilities to be used during system operation, land on which to build the facilities, and a plan for collecting invested funds. As the result, it was concluded in view of the magnitude of the expected fruit that the model project be implemented at this plant. (NEDO)

  7. Fiscal 2001 survey report on regional new energy vision formulation at Kyonan Town; 2001 nendo Kyonan machi shin energy vision sakutei chosa hokokusho. Chiiki shin energy vision sakutei tou jigyo (Watashitachi ga tsukuru machi, subete ga koen no machi)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    A regional new energy vision was formulated at Kyonan Town, Chiba Prefecture, which includes a new energy introduction plan, an action program for the plan, and the like, intended to promote enlightenment/popularization relative to new energy and environmental matters. Kyonan Town consumes 18.69 times 10{sup 10} kcal of energy, with oil accounting for 65.4%, LPG for 6.0%, and electricity 28.6%, the statistics disclosing that the town has an oil-dependent energy consumption structure. The new energy likely to be introduced will comprise 13,574 times 10{sup 10} kcal/year in solar energy, 336,187 MWh/year in wind power, 17,170 kWh/year in small-scale hydroelectric power, 0.57 times 10{sup 10} kcal/year in refuse fueled power, and 0.60 times 10{sup 10} kcal/year in biomass fueled power. The town's new energy introduction project centers on photovoltaics, passive solar heat utilization, wind power, small-scale hydroelectric power, and aims to introduce the new energies into public facilities such as the Eco Garden and Katsuyama Primary School, and into kindergartens, nursery schools, shopping malls, and so forth. A plan was also worked out for adopting clean-energy vehicles for official use. (NEDO)

  8. Report on the research cooperation promoting project in fiscal 1998. Research cooperation related to the mine waste water treatment technology utilizing biomass; 1998 nendo kenkyu kyoryoku suishin jigyo hokokusho. Bio riyo ni yoru kohaisui shori gijutsu ni kansuru kyoryoku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This paper describes the achievement in relation with the mine waste water treatment technology utilizing biomass, from among the promotion projects for research cooperation with China. Waste water is converted into ferric iron (Fe{sup 3+}), which precipitates at low pH, by utilizing iron oxidizing bacteria which use ferrous iron (Fe{sup 2+}) in the waste water as the energy source, and is precipitated and removed by using low-cost calcium carbonate as a neutralizing agent. Fiscal 1998 has performed eight site surveys with 47 persons in total. The main survey items are the study and guidance of pilot plant operation and the survey on measures to prevent occurrence of contamination by heavy metals in Wushan Mine. Additional site surveys were made at Dexing Mine and Yinshan Lead/Zinc Mine. Continued from fiscal 1997, consumables required for the pilot plant were purchased, and items of the bench-scale testing equipment used by Japan for domestic researches (an oxidation and neutralization testing equipment and a copper recovering and testing equipment) were transported to China. The operation research data of the pilot plant were put in order and analyzed. This paper summarizes the concept design of the shaft waste water treatment facilities for the north mine in Wushan Mine, and the surveys on measures for heavy metal contamination sources. (NEDO)

  9. Museum of water, green and the sun - Marumori. New energy vision of the Marumori Town area; 2001 nendo Marumori machi shin energy vision hokokusho. Chiiki shin energy vision sakutei tou jigyo (Mizu to midori nto taiyo no hakubutsukan Marumori)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    In Marumori Town, Miyagi Prefecture, a 'new energy vision of the area' was worked out which indicated the assessment of the energy reserved in the town and the course of new energy to be determined in the future. The energy consumption amount of Marumori Town in FY 1999 was estimated at 47,535 kL in crude oil conversion. By sector, the energy consumption amount was the largest in the order of the industrial sector, the transportation sector and the commercial/residential sector. The availability of new energy in Maruyama Town was estimated at approximately 480,585 GJ, of which the solar energy utilization was the largest, 53.1%. The photovoltaic power generation was the next largest, 25.4%, followed by the temperature difference energy (underground water), 8.9%, clean energy car, 7.8%, etc. As a plan for the first introduction of new energy, the following were studied: introduction of photovoltaic power generation facilities to the Marumori Town Office, introduction of new energy to public facilities around the Fudoson Park, introduction of wind power generation facilities to the town-run pasture, construction of the Marumori-type biogas plant, construction of a mini hydroelectric power plant, introduction of clean energy car to public vehicles, introduction of new energy facilities to the area of Kawa-no-Eki (station of the river), etc. (NEDO)

  10. FY 2000 Project of developing international standards for supporting new industries. Standardization of the fine bioceramics testing/evaluation methods; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Seitaiyo fine ceramics no shiken hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Described herein are the FY 2000 results of the research and development of the fatigue characteristics of the bioceramics, fatigue and impact-resistance characteristics of the members of these materials, and methods of evaluating their compatibility with a living body, for proposing the international standards. The test results of alumina and zirconia as the bioceramics indicate that their bending fatigue characteristics greatly depend on environmental conditions and frequency, suggesting necessity for the evaluation in the environments which simulate the living body inside. The compression and impact tests are conducted for the artificial femoral heads with a taper. It is found that the simulated body fluid, having the dissociated ion concentration adjusted at the level in the human blood plasma, remains unchanged in the concentration at 36.5 degrees C for 4 weeks; the ion concentration is unaffected by filtration with the aid of the microfilter useful for, e.g., removal of bacteria; and the synthetic apatite has almost the same composition as that for the bones in a living body. It is also suggested that activity of the bioactive ceramics can be evaluated by their ability for forming apatite in the simulated body fluid. (NEDO)

  11. Fiscal 2000 survey report. Foundation building project for international energy use rationalization. Master plan preparation for rationalized energy use; 2000 nendo kokusai energy shiyo gorika kiso seibi jigyo chosa hokokusho. Goriteki energy shiyo no tame no master plan sakusei

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For energy conservation and environmental protection using technologies for effective consumption of energy and for preventing pollution due to energy consumption, master plans were studied and prepared on photovoltaic power generation, wind power generation, natural gas utilization, and so on, for the Xinjiang Uygur Zizhiqu, Gansu Province, and Guandong Province, respectively. Propositions addressing the Xinjiang Uygur Zizhiqu involved a decrease in dependence on coal, utilization of natural gas, introduction of coal-fired cogeneration systems, introduction of wind power up to the level equivalent to the supply reserve capability, energy conversion and new industry development using natural gas, promotion of electrification of local communities, and so on. Propositions addressing Gansu Province involved the hydroelectric power system as the core of power sources, decrease in dependence on coal, enhanced utilization of natural gas, energy conversion and new industry development utilizing natural gas, and so on. Propositions addressing Guangdong Province involved a decrease in dependence on coal and oil, enhanced utilization of natural gas, introduction of natural gas-fired combined cycle power generation into urban sectors, accelerated utilization of wind power generation on isolated islands, and so on. (NEDO)

  12. Report on survey for environment harmonizing type energy community project for Chubu International Airport. District heat supply facilities using large-scale cogeneration systems; Chubu kokusai kuko kankyo chowagata energy community jigyo chosa hokokusho. Daikibo cogeneration chiiki netsu kyokyu shisetsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The Chubu International Airport is positioned as a hub airport scheduled to start its use in the early part of the 21st century, to which introduction of large-scale cogeneration systems was discussed. Structuring an energy supply system conscious of the 21st century is intended, that is friendly to the environment, is attached with importance on the economy, and has high reliability and safety. The systems have cogeneration capacity from 4,500 to 6,000 kW, and utilize high-pressure waste heat from the cogeneration system as the heat source. The system uses the high pressure waste heat, stored heat, and gas at the same time to achieve high economic performance brought about by heat storage and the best energy source mix, while attempting cascade utilization of the heat. Considerations were given to suppress the environmental and energy load on the district as low as possible for the coexistence with the district, and to build framework and coordination to return the merits to the district. Subsidy introduction also has a great effect to assure the economic performance. The optimal specific construction of the system was found in combining the utilization of energy generated from temperature difference in sea water as a heat source system, the topping system utilizing the high pressure waste heat available in the system, high-efficiency heat pumps, and the heat storing system utilizing electric power available at late night. (NEDO)

  13. R and D project for large industrial technologies in fiscal 1990. Report on achievements in R and D of robots for critical works; 1990 nendo seika hokokusho. Ogata kogyo gijutsu kenkyu kaihatsu jigyo. Kyokugen sagyo robot no kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-01-01

    Research and development have been performed on basic technologies common to different types of robots to carry out works in critical conditions. This paper summarizes the achievements in fiscal 1990. In the R and D of tactile sensors, a prototype multi-element sensor array applicable to fingers of a robot hand was produced, and the characteristics test was conducted. In the R and D of motive force technologies, a force controlled actuator for wrist containing a torque sensor was designed and produced on a trial basis, whereas evaluations were given on the size and weight reduction and the force control performance. Regarding the actuator with redundant degree of freedom, a force controlled arm was attached with an actuator with three degrees of freedom to have performed an evaluation experiment. With regard to a small size and light weight controller, fabrication was carried out on a multi-function, high-density controller which adds positional control and peripheral interface functions to the force controlling function, and an evaluation was given. In the R and D of robot language, discussions were given on robot languages related to each system of movement, manipulation, and sensors, and the grammar specifications were prepared. (NEDO)

  14. Fiscal 2000 survey report on project for promoting international cooperation. Survey on coal utilization in APEC region (Coal note); 2000 nendo kokusai kyoryoku suishin jigyo chosa hokokusho. APEC iki nai ni okeru sekitan riyo jokyo tou chosa (Koru note)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With the purpose of contributing to the infrastructure for promoting clean coal technology (CCT), there were compiled as the 'coal note' various kinds of coal-related information in China, Indonesia, Philippine, Thailand and Vietnam among APEC countries. Concerning China, for example, economic growth and energy supply/demand in the category of the energy outline were described in detail; as were the guiding principle. individual guidance plan, and specific energy policy of the 10th five year plan, in the category of the energy policy; coal deposits, geological summary, coal quality in each coal forming period, and the status quo of development, in the category of the coal mines and development; coal supply/demand, production, consumption, and export, in the category of the present status of the coal industry; producers, sales, quality of product coal, distribution, and price, in the category of the domestic supply; present state of environmental problems relating to coal, and environmental measures intended for coal, in the category of the coal-related environmental issues; and development, production, coal cleaning, quality control, safety control, and utilization (combustion, liquefaction and gasification), in the category of coal utilization technology, respectively. (NEDO)

  15. Microtremor Array Measurement Survey and Strong Ground Motion Observation Activities of The MarDiM (SATREPS) Project

    Science.gov (United States)

    Ozgur Citak, Seckin; Karagoz, Ozlem; Chimoto, Kosuke; Ozel, Oguz; Yamanaka, Hiroaki; Aksahin, Bengi; Arslan, Safa; Hatayama, Ken; Ohori, Michihiro; Hori, Muneo

    2015-04-01

    Since 1939, devastating earthquakes with magnitude greater than seven ruptured North Anatolian Fault (NAF) westward, starting from 1939 Erzincan (Ms=7.9) at the eastern Turkey and including the latest 1999 Izmit-Golcuk (Ms=7.4) and the Duzce (Ms=7.2) earthquakes in the eastern Marmara region, Turkey. On the other hand, the west of the Sea of Marmara an Mw7.4 earthquake ruptured the NAF' s Ganos segment in 1912. The only un-ruptured segments of the NAF in the last century are within the Sea of Marmara, and are identified as a "seismic gap" zone that its rupture may cause a devastating earthquake. In order to unravel the seismic risks of the Marmara region a comprehensive multidisciplinary research project The MarDiM project "Earthquake And Tsunami Disaster Mitigation in The Marmara Region and Disaster Education in Turkey", has already been started since 2003. The project is conducted in the framework of "Science and Technology Research Partnership for Sustainable Development (SATREPS)" sponsored by Japan Science and Technology Agency (JST) and Japan International Cooperation Agency (JICA). One of the main research field of the project is "Seismic characterization and damage prediction" which aims to improve the prediction accuracy of the estimation of the damages induced by strong ground motions and tsunamis based on reliable source parameters, detailed deep and shallow velocity structure and building data. As for detailed deep and shallow velocity structure microtremor array measurement surveys were conducted in Zeytinburnu district of Istanbul and Tekirdag province at about 81 sites on October 2013 and September 2014. Also in September 2014, 11 accelerometer units were installed mainly in public buildings in both Zeytinburnu and Tekirdag area and are currently in operation. Each accelerometer unit compose of a Network Sensor (CV-374A2) by Tokyo Sokushin, post processing PC for data storage and power supply unit. The Network Sensor (CV-374A2) consist of three servo

  16. Microtremor Array Measurement Survey and Strong Ground Motion observation activities of The SATREPS, MarDiM project -Part 2-

    Science.gov (United States)

    Citak, Seckin; Karagoz, Ozlem; Chimoto, Kosuke; Ozel, Oguz; Yamanaka, Hiroaki; Arslan, Safa; Aksahin, Bengi; Hatayama, Ken; Ohori, Michihiro; Hori, Muneo

    2016-04-01

    Since 1939, devastating earthquakes with magnitude greater than seven ruptured North Anatolian Fault (NAF) westward, starting from 1939 Erzincan (Ms=7.9) at the eastern Turkey and including the latest 1999 Izmit-Golcuk (Ms=7.4) and the Duzce (Ms=7.2) earthquakes in the eastern Marmara region, Turkey. On the other hand, the west of the Sea of Marmara an Mw7.4 earthquake ruptured the NAF' s Ganos segment in 1912. The only un-ruptured segments of the NAF in the last century are within the Sea of Marmara, and are identified as a "seismic gap" zone that its rupture may cause a devastating earthquake. In order to unravel the seismic risks of the Marmara region a comprehensive multidisciplinary research project The MarDiM project "Earthquake And Tsunami Disaster Mitigation in The Marmara Region and Disaster Education in Turkey", has already been started since 2003. The project is conducted in the framework of "Science and Technology Research Partnership for Sustainable Development (SATREPS)" sponsored by Japan Science and Technology Agency (JST) and Japan International Cooperation Agency (JICA). One of the main research field of the project is "Seismic characterization and damage prediction" which aims to improve the prediction accuracy of the estimation of the damages induced by strong ground motions and tsunamis based on reliable source parameters, detailed deep and shallow velocity structure and building data. As for detailed deep and shallow velocity structure microtremor array measurement surveys were conducted in Zeytinburnu district of Istanbul, Tekirdag, Canakkale and Edirne provinces at about 109 sites on October 2013, September 2014 and 2015. Also in September 2014, 11 accelerometer units were installed mainly in public buildings in both Zeytinburnu and Tekirdag area and are currently in operation. Each accelerometer unit compose of a Network Sensor (CV-374A) by Tokyo Sokushin, post processing PC for data storage and power supply unit. The Network Sensor (CV-374

  17. Microtremor Array Measurement Survey and Strong Ground Motion observation activities of The SATREPS, MarDiM project -Part 3-

    Science.gov (United States)

    Citak, Seckin; Safa Arslan, Mehmet; Karagoz, Ozlem; Chimoto, Kosuke; Ozel, Oguz; Yamanaka, Hiroaki; Behiye Aksahin, Bengi; Hatayama, Ken; Sahin, Abdurrahman; Ohori, Michihiro; Safak, Erdal; Hori, Muneo

    2017-04-01

    Since 1939, devastating earthquakes with magnitude greater than seven ruptured North Anatolian Fault (NAF) westward, starting from 1939 Erzincan (Ms=7.9) at the eastern Turkey and including the latest 1999 Izmit-Golcuk (Ms=7.4) and the Duzce (Ms=7.2) earthquakes in the eastern Marmara region, Turkey. On the other hand, the west of the Sea of Marmara an Mw7.4 earthquake ruptured the NAF' s Ganos segment in 1912. The only un-ruptured segments of the NAF in the last century are within the Sea of Marmara, and are identified as a "seismic gap" zone that its rupture may cause a devastating earthquake. In order to unravel the seismic risks of the Marmara region a comprehensive multidisciplinary research project The MarDiM project "Earthquake And Tsunami Disaster Mitigation in The Marmara Region and Disaster Education in Turkey", has already been started since 2003. The project is conducted in the framework of "Science and Technology Research Partnership for Sustainable Development (SATREPS)" sponsored by Japan Science and Technology Agency (JST) and Japan International Cooperation Agency (JICA). One of the main research field of the project is "Seismic characterization and damage prediction" which aims to improve the prediction accuracy of the estimation of the damages induced by strong ground motions and tsunamis based on reliable source parameters, detailed deep and shallow velocity structure and building data. As for detailed deep and shallow velocity structure microtremor array measurement surveys were conducted in Zeytinburnu district of Istanbul, Tekirdag, Canakkale and Edirne provinces at about 140 sites on October 2013, September 2014, 2015 and 2016. Also in September 2014, 11 accelerometer units were installed mainly in public buildings in both Zeytinburnu and Tekirdag area and are currently in operation. Each accelerometer unit compose of a Network Sensor (CV-374A) by Tokyo Sokushin, post processing PC for data storage and power supply unit. The Network Sensor

  18. FY 1998 annual report on the introduction/dissemination working group. 19th R and D activity report; 1998 nendo donyu fukyu jigyo bunkakai. Dai 19 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    Summarized herein are the FY 1998 R and D activities by the introduction/dissemination working group, extracted from the 19th R and D activity report by NEDO. Mr. Yamaho, a NEDO's director, reports (General situations of the new energy introduction promotion department). The R and D project results include those of renewable energy sources, such as the results of the field test and supporting projects for solar light power generation, wind power generation and solar heat utilization; and those of recycling type energy, such as the results of the field test projects for power generation by wastes and fuel cells, and the results of the projects for district heat supply by co-generation systems. The other results presented include those of the projects for dissemination of clean energy vehicles, supporting new energy entrepreneurs, promotion of introducing district new energy, drawing visions for district new energy, field tests for introducing high-performance industrial furnaces, modeling for introducing facilities for rationalized use of pioneer energy, promotion of disseminating ice-aided, heat-storage type air conditioning systems, and promotion of introducing decentralized gas-aided air conditioning for existing small- to medium-sized buildings. (NEDO)

  19. 17th Business Report Meeting of New Energy Industrial Technology Development Organization (NEDO). Section Meeting on International Cooperation Projects; Dai 17 kai jigyo hokokukai. Kokusai kyoryoku jigyo bunkakai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    In this section meeting, reports were made on the following themes: 1) pregrinder model project; 2) power recovery model project; 3) energy conservation model project and the importance of the spread. In 1), this model project aims to demonstrate that the electric power unit requirement for cement production can be reduced by installing a pregrinder at the front step of ball mill as the finish process at a cement factory in Indonesia, increasing capacity of ball mill grinding, and reducing operational loads of the ball mill which is large in power consumption. In 2), this project aims to supply China a technology to recover power from high temperature/high pressure exhaust gas via gas expander as electric power of 5.8MW after separating FCC catalyst associated with from the exhaust gas from the generative tower of fluid catalytic cracking equipment for oil refining. To come up to expectations for Japan from neighboring countries in Asia, NEDO Information Center carried out the energy conservation model project, etc. as the international cooperation related project in the energy/environment field. The center is now developing 10 projects. (NEDO)

  20. Fiscal 2000 project of inviting proposals for international joint research - invitation for international proposal (Energy conservation No.2). Achievement report on international joint study on popularization promotion of geothermal heat pump-assisted environmentally compatible heating system for Changchun City, China; 2000 nendo kokusai kyodo kenkyu teian kobo jigyo - kokusai teian kobo (Shoe No.2). Chinetsu heat pump ni yoru Chugoku Changchun shi kankyo tekigogata danbo system no fukyu sokushin ni kansuru kokusai kyodo kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A geothermal heat pump-assisted heating system is introduced into Changchun City and a survey is conducted to determine if the system may be popularized in this extremely cold region located in the northeastern part of China. In concrete terms, the hot water that circulates through the office building of Changchun Ground Heat Development Co., Ltd., is switched to hot water prepared by a geothermal heat pump. The test continued from December 2000 to March 2001. It is then concluded that heating by geothermal heat pumps will be fully serviceable to Changchun City. Implemented are (1) the shift from the coal fired boiler system to a geothermal heat pump system comprising 16 subterranean heat exchangers for the heating of the office building which is approximately 1000 m{sup 2} large, (2) long-term monitoring of the operating conditions, (3) measurement of subterranean heat exchanger thermal conductivity and subterranean temperature, and (4) the study of pipe shapes for improved thermal efficiency, grouting materials, and the like. (NEDO)

  1. Report on geothermal development promotion survey in fiscal 1999. Survey on hot water (collection and analysis of hot water) in Tsujinodake Area No. B-6; 1999 nendo chinetsu kaihatsu sokushin chosa hokokusho. Nessui no chosa (nessui no saishu oyobi bunseki) No.B-6 Tsujinodake chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-10-01

    This paper reports the survey on hot water in the geothermal development promotion survey in fiscal 1999 in the Tsujinodake area. The hot water pumped up at the N11-TD-2 well is considered to have been originated from sea water mixed with the same amount of meteoric water including waters from Ikeda Lake and Unagi Pond, and been heated mainly by heat conduction. The hot water temperature near the well is 120 to 130 degrees C, but the upper stream of hot water flow is estimated to be 160 to 230 degrees C. The test samples collected and analyzed are those pumped up from depths greater than 1,500 m, having the same origin as the high temperature hot water of higher than 200 degrees C flowing sideways at the relatively shallow portions (depths of 400 to 800 m). The hot water is estimated to be rising from deep portions of mainly the north-east shore of Unagi Pond in which exhalation bands are located, and its temperature is considered to be 260 to 270 degrees C at deep sections. The high temperature geothermal reservoir spreading in relatively shallow sections of the N11-TD-2 well mainly around the vicinity of the north-east shore of Unagi Pond has a high possibility of being continued even to the vicinity of the west Ibusuki area in the north-east direction. However, the spread of the geothermal reservoir with high temperatures (200 degrees C or higher) is considered not too large in the direction of the Matsugakubo in the north-west and the Narikawa area direction in the south-east. (NEDO)

  2. Research report on promotion of geothermal energy exploitation for fiscal 1997. Test drilling into the structure, construction work for research, and analysis (No.B-4 Kuenohira district); 1997 nendo chinetsu kaihatsu sokushin chosa. Kozo shisui chosa koji oyobi kaiseki hokokusho (No.B-4 Kuenohirayama chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    Cuttings from a test drilling in the Kuenohira district, Oita Prefecture, are subjected to analysis. The result of ground surface investigation suggested the presence of a magma reservoir to serve as heat source and a highly permeable zone along a fault to help the formation of a thermal water retention system. At the N9-KH-1 drilling site, however, no geothermal reservoir is found along the periphery of the subsidence in the western part of the research area. In this district, it is deemed, no geothermal reservoir has been formed due to shortage of heat supply from the heat source and insufficient geothermal water activity. It is also deemed that the district, in which fractures of the E-W system, NNW-SSE system, and NE-SW system are distributed, is a region at which meteoric water flows into larger convection systems. As for the westward stretch of the geothermal reservoir (where the N9-KH-1 site is situated) that has developed on the swell of the basement, detected to exist at N2-MW-2 and N3-MW-6 in the eastern part of the research area, it is found to be not so extensive. (NEDO)

  3. Fiscal 2000 report on geothermal energy development promotion survey. Phase 1. Report on environmental impact survey in No. C-5 Appi district (Hot spa fluctuation); 2000 nendo chinetsu kaihatsu sokushin chosa hokokusho. No. C-5. Appi chiiki kankyo chosa (onsen hendo) dai 1 ji

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    For the assessment of the environmental impact to be produced by geothermal exploration well boring and short-term outburst tests, water in hot spas, fountains, and rivers in and around the Appi survey district was inspected for fluctuation. A survey was conducted of multiple components to help analysis of the geothermal reservoir structure. Distributed in the alteration zone in this district are the hot spas of Kusanoyu, Shin-Kusanoyu, Appi, and so forth, and, in the vicinity, numerous hot spas including Iwahatanoyu belonging to the Appi hot spa. In the multiple component survey, 12 hot spas, 1 fountain, 8 rivers, and 2 gas wells were subjected to measurement. In the fluctuation survey, 5 hot spas, 1 fountain, 5 rivers, and the amount of precipitation were subjected to measurement. In the survey of river bottom quality and river bed rocks, river bottom quality was checked at 18 spots and river bed rocks at 12 spots. It was found that fluctuation was great in the amount of welling water at Kusanoyu, Shin-kusanoyu, and Appi, with the coefficient of fluctuation recording 10 or more. A negative correlation was detected between the welling amount and water temperature. It is deemed that the hot water spurts out of natural fountains or shallow wells and that its temperature tends to grow lower with an increase in meteoric water by which it is diluted. (NEDO)

  4. FY 1999 report on the comprehensive analysis of the geothermal development promotion survey. Forth. No.C-3 Akinomiya area (Separate volume 2: Collected data); 1999 nendo chinetsu kaihatsu sokushin chosa sogo kaiseki hokokusho. No. C-3 Akinomiya chiiki (Dai 4 ji) - Bessatsu 2 (shiryoshu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-01-01

    As to the survey of the existence amount of geothermal resource in the Akinomiya area, Ogachi town, Akita prefecture, which was made in FY 1999, the comprehensive analysis was conducted, and the data were arranged. In relation to the surface survey, data on the following were described: geological survey, supplementary surface geological survey, soil gas survey, precision gravity survey, supplementary gravity survey and 3D model re-analysis, electromagnetic survey, etc. With relation to the well survey, data on the following: wells of N8-AY-1, N8-AY-2, N9-AY-3, N9-AY-4, N9-AY-5, N10-AY-6, N10-AY-7 and N10-AY-8, survey of cores of existing wells, temperature/pressure logging of wells remaining stationary after having been left long, sampler logging, etc. In relation to the jetting test, data on the short-term jetting test on wells of N8-AY-1, N8-AY-2, N9-AY-3, N9-AY-4, etc. With relation to the evaluation of reservoirs, data on the pressure monitoring, results of the reservoir simulation, etc. (NEDO)

  5. Report on a survey for promotion of geothermal development and an overall analysis of areas in fiscal 1996. Report No.C-3 for the Akinomiya area (First analysis); 1996 nendo chinetsu kaihatsu sokushin chosa sogo kaiseki hokokusho. No.C-3 (Akinomiya chiiki dai 1 ji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This paper summarizes the result of a survey for promotion of geothermal development and an overall analysis of the Akinomiya area in fiscal 1996. The subject area is located in Katsuo Town in south of Akita Prefecture. The geothermal reservoirs are regulated by the irregular construction created by upheaval and subsidence of the pre-Tertiary basement rocks. The underground temperature construction shows the temperatures rising toward Mt. Yamabushi. The latest geothermal activities should have taken place after the eruption of Mt. Takamatsu. The geothermal activities near the Arayu area have been most active until recently, and is still predominant. Transformation activities were active in the former period of the Pleistocene era. The acidic transformation band has been active after sedimentation of andesites in Mt. Takamatsu thereafter, which should have been active not only in areas where it is now active on the ground surface, but also in greatly wider areas. Geothermal fluid flows being regulated by faults, whereas fractures with high permeability existing along the faults are suitable for developing steam collection. Hot spring waters were produced by the geothermal fluid having risen along the faults and been mixed with and diluted by ground surface water near the ground surface. Areas promising for geothermal development would spread over the areas with high permeability along structural lines such as faults which show the convection type temperature pattern and temperatures higher than 250 degrees C. (NEDO)

  6. Preliminary survey of `Green Recycling System`; Jigyo jizen chosa `green recycle system`

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This report describes the construction of `Green Recycling System` which aims to change deserts to lush lands and to stabilize food supply. A cross-linked polymer produced by irradiating the gooey threads of natto (fermented soybeans) with gamma rays can absorb and hold up to 5,000 times its own weight of water. This biodegradable polymer may be used to develop seed gels and pellets to grow soybean, rice and wheat to improve the productivity of deserts and to protect threatened lands from desertification. This technology will be of great value in establishing stable supply of food resources, especially for the Middle East where deserts are expanding as well as for Africa where serious food shortage is already in place. To undertake the Green Recycling System Project, it is indispensable to develop technologies for producing PGA polymer in large quantity, mass production process of bridged PGA through radiation, chemical cross-linkers, new technologies for growing plants using water retainers, water-retaining materials for arid areas, general systems for growing plants in arid areas, and environmentally benign industrial infrastructures. 76 refs., 59 figs., 29 tabs.

  7. FY 1999 report on the investigational study of the actual state of the utilization of clean energy vehicles for the transport business use; 1999 nendo chosa hokokusho. Unso jigyo yo clean energy jidosha no shiyo jittai ni kakawaru chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of promoting the utilization of clean energy vehicles (CEV), survey was made on the assessment of the pollution by the CEVs introduced by now, subjects on the utilization, etc. As to the transport business use CEV running in the market, CNG vehicle is mostly used, and therefore, the gas emitted from them was tested. As a result, it was found out that CNG vehicle emits fewer NOx, PM and soot/smoke than diesel cars and contributes to improving the air pollution in large cities. However, it emits more CO2 than diesel car, and accordingly, it is necessary to reduce the fuel consumption. The practicality in the limited running distance is almost the same as that of diesel car, but it is desirable to improve startability, acceleration and gradability. Further, the occurrence of any troubles was pointed out in a third of the total numbers of CEV vehicle. Improvement in reliability is a must. CEV is higher in car cost than diesel car, and for the spread/promotion, it is necessary to prepare for assistance such as subsidy. Moreover, there are many requests for improvement in number, business hours, supply capacity, etc. of fuel supply station. (NEDO)

  8. FY 2000 Project of developing international standards for supporting new industries. Standardization of the testing/evaluation methods for high coherent lasers; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Ko coherent laser no shiken (hyoka hoho no hyojunka)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Described herein are the FY 2000 results of the development of high-precision, stabilized lasers, laser interferometers and signal processors, and developmental researches on the testing/evaluation methods for spectral characteristics of high-performance lasers, among others, for proposing the international standards. The program for narrowing the spectral lines for semiconductor lasers experimentally confirms validity of the external resonator structure with the diffraction lattice. The program for the developmental research on spectral width meter designs the width meter based on the delayed self-heterodyne technique, because of necessity for measurement of the spectral line width at a resolution of several hundreds Hz or less. The program for the saturation spectroscopy of iodine molecule designs and fabricates the iodine cell, to lock the semiconductor laser wavelength on the specific absorption line of iodine. It is judged, based on the test results, to be rational to adopt the absorption line of the (6-3) transitional P33 superfine structure. The program for the developmental research on wavelength meter conducts the preliminary tests for atmospheric pressure, temperature and humidity changes as the parameters which affect the measurement accuracy. (NEDO)

  9. Fiscal 2000 project for development of international standards for supporting novel industries. Standardization of methods for testing and evaluating plastic optical fiber; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Plastic hikari fiber no shiken hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Studies were made about methods for testing and evaluating plastic optical fiber (POF) for the purpose of submitting a proposition to IEC (International Electrotechnical Commission) for the methods to be internationally standardized. In this fiscal year, tests and analyses were conducted relative to the effects of the light source emission area size, wavelength, and axial displacement. Next, underfilled launch was studied from a practical viewpoint, and a method using a mode filter was proposed. Finally, round robin tests were conducted for each of the companies using overfilled launch and underfilled launch, and the reproducibility of measured values was grasped. In this fiscal year, a new study added, which involved a method for measuring structural parameters. Though POF was below standard as an object of IEC's gray scale method, yet it was found, thanks to the recently developed CCD (charge coupled device) cameras, that the method might also be applicable to POF. A groundwork plan was drafted on band test methods including the overfilled launch method toward international standardization. (NEDO)

  10. Fiscal 1996 research cooperation promotion project. Report on the Japan/Mexico international cooperation research on recovery of valuable elements in brine; 1996 nendo kenkyu kyoryoku suishin jigyo. Kansuichu no yuka shigen kaishu gijutsu ni kansuru kenkyu kyoryoku follow up hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    In the research cooperation promotion projects having been carried out, the R and D of an overall recovery system have been conducted which recovers effectively and systematically valuable resources such as magnesium, bromine and boron including in brine made after the salt manufacturing in the coastal region in Mexico. In this project, as the research on the distilling process needed for commercialization of the system to recover valuable resources from the brine, Japan has been collecting information on various distilling processes and solar pond systems and studying a distilling process appropriate to the site jointly with Mexico. As a result, a seawater desalination process which combined the solar pond using solar energy and the evaporation method was recommended as a low-priced distilling method. Moreover, it was indicated that the solar still method for condensing/recovering the evaporated water of the Guerrero Negro salt pan is also less influential in the salt manufacturing process and is viable as a most economical distilling process by studying the structural design and operational method of more efficient solar stills

  11. FY 1999 project on the development of new industry support type international standards. Standardization of evaluation method of the genetic testing system; 1999 nendo shinki sangyo shiengata kokusai hyojunka kaihatsu jigyo seika hokokusho. Idenshi kensa system no hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Aiming at applying standards as international standards, an experimental study was conducted on the standardization of the genetic testing system in Japan and abroad. The FY 1999 results were summarized. As to the unification of testing data processing, analysis of the present state and experimental study were made on the following: sampling method for appropriate testing, selection of anti-coagulants, method to preserve specimens, method to transport them, description of clinical observations in test request paper, method to evaluate performance of test reagents including restriction enzyme, temperature calibration method for equipment, sterilization method, incineration method of specimens, long-term storage of DNA samples, etc. The results were proposed as standard operation procedures after study/discussion at the comprehensive survey committee. Concerning the setting of criteria values in data analysis and the standardization of report form, survey/study were conducted also on ethical/legal/social problems from an aspect of privacy protection of patients. As a result, a total system from the reception of genetic testing to the report making was prepared. (NEDO)

  12. Achievement report for fiscal 1998 on the research cooperation project for a technology to facilitate setting forming conditions for engineering plastics; 1998 nendo engineering plastic no seikei joken kan'i settei gijutsu ni kansuru kenkyu kyoryoku jigyo seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This project is intended to support plastics manufacturing being the important supporting industry in Thailand for manufacture of household electric appliances and automobiles, particularly the manufacture of engineering plastics having excellent heat and impact resistance. In order to achieve the target, a supporting system is being developed to allow injection molding of engineering plastics to be performed easily. The project aims particularly at developing a system that suits climate conditions in Thailand, properties of plastic materials procurable in Thailand, and skills of Thai engineers. The current fiscal year has carried out the following activities: evaluating materials required for the research and development, deciding the specifications for and ordering product evaluating and testing facilities, molds and mold cooling and heating adjustment devices, and an injection molding CAE system; these items were introduced and installed in Thailand; engineers were sent from Japan to perform technical guidance on operation, maintenance and management of the material and product evaluating and testing facilities, as well as joint researches; and Thai researchers were received to execute training on product evaluating and testing technologies, forming and processing technologies, and CAE utilizing technologies. (NEDO)

  13. FY 2000 report on the survey of the project on field tests on the introduction of high performance industrial furnaces. Analysis/evaluation of the collected data; 2000 nendo koseino kogyoro donyu field test jigyo chosa hokokusho. Shushu data kaiseki hyoka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of achieving the target of reduction in CO2 regarded as substance causing global warming which was agreed at COP3, the study has been made since FY 1993 on 'the development of high performance industrial furnaces (regenerative combustion furnace using heat storage type burner for realization of high temperature air combustion).' By applying the good results obtained, a field test project for introduction of high performance industrial furnace has been implemented for three years (FY 1998 - FY 2000) to confirm the actual performance, reliability, etc. Collection/arrangement were made mainly of the data obtained in this field test project for the introduction of high performance industrial furnaces in each fiscal year (1998, 1999 and 2000), and verification/evaluation and arrangement were made. In this R and D, energy conservation was achieved at a rate of more than 30% of the target. Also about NOx, the result was obtained that the NOx by energy saving can be reduced 50% in almost all kinds of furnace if adding the reduction amount in emission amount and the reduction amount by high temperature air combustion. About the quality, the good result was obtained. Downsizing was conducted in approximately 10 examples. (NEDO)

  14. Fiscal 2000 feasibility research on environmentally-friendly coal utilization system. Feasibility research project (Clinkering technology for fluidized bed cement kiln - China); 2000 nendo kankyo chowagata sekitan riyo system kanosei chosa hokokusho. Jisshi kanosei chosa jigyo (ryudosho cement kiln shosei gijutsu Chugoku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Studies are conducted about the feasibility of the above-named technology in China, its energy conservation and environmental protection effects, and so forth. To be expected upon conversion of shaft kilns in China to fluidized bed kilns using this technology are energy conservation of approximately 30%; resultant reduction in greenhouse effect gas emissions, in the scattering of coarse particulates, and in NOx and SOx emissions, these in combination contributing to reduction in environmental pollution; stable production of high-quality clinker; preference to inexpensive fuels and the effective utilization of resources; reduction in the cement manufacturing cost; and so forth. On-site surveys were conducted at existing shaft kiln plants, and studies were made about conversion to fluidized bed cement kilns with a 1,000 tons/day capability. The conclusion was that the period of return on invested capital would be 3.94-8.98 years, dependent upon the degree of facilities renovation, showing the presence of high possibilities of a successful return on invested capital. It was estimated that the shaft kilns would bring about a yearly reduction of 840 tons of coarse particulates, 105 tons of SO{sub 2}, and 68,281 tons of CO2. (NEDO)

  15. FY 2000 report on the potential survey of implementation of a model project for improvement of thermal efficiency and energy conservation in refineries of Indonesia; 2000 nendo chosa hokokusho. Indonesia ni okeru seiyujo netsukoritsu kojo shoenergy model jigyo jisshi kanosei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    For the purpose of heightening the thermal efficiency in oil refineries in Indonesia, survey was conducted of two main refineries of Pertamina (Cilacap Refinery and Balikpapan Refinery), and a potentiality of spreading energy conservation technology was studied. As a result of the study, the following were found out. In Cilacap Refinery, there is a possibility of energy conservation by enhancing the efficiency of the atmospheric distillation system and rationalizing utility facilities. As to Balikpapan Refinery, when effects of energy conservation are calculated by effectively using the by-producing off-gas emitted from the oil refining process which was recovered as on-site fuel, the amount of reduction in fuel consumption became 2.3 KL-FOE/h, and the year of simple investment recovery 1.7 years. Further, by recovering/effectively using hydrogen in the separation gas emitted from the hydrocracking unit, fuel/raw material in the hydrogen producing facilities were reduced, and the energy conservation effect became 2.98 KL-FOE/h in the amount of reduction in fuel consumption and 2.9 years in the year of simple investment recovery. (NEDO)

  16. FY 1999 project on the development of new industry support type international standards. Comprehensive survey research on the promotion of international standardization; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Kokusai hyojunka suishin ni kakawaru sogo chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of promoting the international standardization effectively/strategically, a comprehensive survey was made, and the FY 1999 results were summarized. In the trend survey on the comprehensive international standardization, survey was conducted for companies in the material field (plastics, rubber and iron steel) and in the mechanical field (robot, machinery, aircraft, etc.). As a result of the survey, it was found out that they have few headquarters systems and experts, but they tackle it strategically and defensively, taking the standardization as business. Also as to the trend of CEN/CENELEC, importance of the continued trend survey was pointed out. In the survey of policy for the international standardization, survey was carried out on the trend of the process for working out the international standards (TS, ITS and SDO). Further, in relation to the technology standards and intellectual property rights in the hi-tech field, survey was made on the present situation of rules for handling intellectual property rights of organizations, groups, etc. for standardization, how to handle intellectual property rights in the standardization process, problems and the solution, etc. (NEDO)

  17. FY 2000 report on the survey of the project on field tests on the introduction of high performance industrial furnaces. Analysis/evaluation of the collected data; 2000 nendo koseino kogyoro donyu field test jigyo chosa hokokusho. Shushu data kaiseki hyoka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of achieving the target of reduction in CO2 regarded as substance causing global warming which was agreed at COP3, the study has been made since FY 1993 on 'the development of high performance industrial furnaces (regenerative combustion furnace using heat storage type burner for realization of high temperature air combustion).' By applying the good results obtained, a field test project for introduction of high performance industrial furnace has been implemented for three years (FY 1998 - FY 2000) to confirm the actual performance, reliability, etc. Collection/arrangement were made mainly of the data obtained in this field test project for the introduction of high performance industrial furnaces in each fiscal year (1998, 1999 and 2000), and verification/evaluation and arrangement were made. In this R and D, energy conservation was achieved at a rate of more than 30% of the target. Also about NOx, the result was obtained that the NOx by energy saving can be reduced 50% in almost all kinds of furnace if adding the reduction amount in emission amount and the reduction amount by high temperature air combustion. About the quality, the good result was obtained. Downsizing was conducted in approximately 10 examples. (NEDO)

  18. Fiscal 1999 international engineer exchange project (Coal mining technology field). Overseas workshop (Australia); 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop (Goshu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This report summarizes the technology exchange with Australian coal mining engineers, the technical levels and needs on coal production, safety and environment in Australia, and the FS result on transfer of Japanese technologies, engineer exchange and joint research in a coal mining technology field. The overseas workshop (Australia) was held on Nov. 9, 1999 (Tues.) in Brisbane, Queensland. The Australia-Japan Technology Exchange Workshop on coal resources and coal mining technology includes 5 sessions (keynote address, trends and issues of coal resource development, coal resources and production technology, coal resources and safety technology, coal resources and environmental problems), and the open forum discussion on innovative technologies for coal mining. 6 Japanese specialists and 11 Australian specialists read papers. After the workshop, the participants visited Liddell Mine in New South Wales to master natural conditions, and production and safety technology levels of Australian coal mines, and to exchange various information with Australian coal mining engineers. (NEDO)

  19. Fiscal 1998 engineer interexchange project (coal mine technology field). International interexchange project (Workshop in Japan); 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya). Kokusai koryu jigyo (kokunai workshop)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This report summarizes the workshop and technical tour held in Japan for technical interexchange of domestic and overseas engineers. From the information obtained, the higher productivity of coal mines is dependent on selective mining under blessed geological conditions, however, basically establishment of an advanced management technique for inexpensive stable operation. Both preliminary collection of geological information and introduction of advanced facilities even under unstable conditions are necessary. The balance and optimization of the whole system, and an excellent human nature for operation are also essential. Use of roof bolt supports is diffusing as improvement technology of excavation speed and roof control technology over the world. However, for introduction of new technologies, collection of test results and various kinds of training are necessary. Methane gas in coal seams as the main theme of the Hokkaido workshop is a precious unused natural resource, and important for prevention of global warming and coal mine protection measures. Its use is dependent on development of gas drainage technology. (NEDO)

  20. Promotional operation for developing industrial technologies for global environment in fiscal 1998. International research exchange operation; 1998 nendo chikyu kankyo sangyo gijutsu kaihatsu suishin jigyo. Kokusai kenkyu koryu jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    With an objective of creating a new scope of study intended of solving global environment problems and structuring a new technical system, exchanges with overseas researchers and research institutions have been carried out subsequent to those in last year. In fiscal 1998, six researchers from different countries were invited to implement joint researches, and two overseas researchers were invited to an international conference on industrial technologies for global environment. In addition, in order to identify trends of research and development in overseas countries, two researchers were sent to universities in Germany and the U.S.A., and three researchers to international conferences and symposiums on the industrial technologies for global environment. It was intended to exchange technological information between overseas researchers and Japanese researchers who are performing the advanced researches on the industrial technologies for global environment, and to proliferate the latest items of technological information. Therefore, seven international seminars have been held, including the '98 Japan-China Global Environment Protection Symposium, 'substance migration and carbon circulation in coral reefs', 'plant bio-technologies in the 21st century', and the Fourth International Forum for Environmental Catalysts. (NEDO)

  1. Promotional operation for developing industrial technologies for global environment in fiscal 1998. International research exchange operation; 1998 nendo chikyu kankyo sangyo gijutsu kaihatsu suishin jigyo. Kokusai kenkyu koryu jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    With an objective of creating a new scope of study intended of solving global environment problems and structuring a new technical system, exchanges with overseas researchers and research institutions have been carried out subsequent to those in last year. In fiscal 1998, six researchers from different countries were invited to implement joint researches, and two overseas researchers were invited to an international conference on industrial technologies for global environment. In addition, in order to identify trends of research and development in overseas countries, two researchers were sent to universities in Germany and the U.S.A., and three researchers to international conferences and symposiums on the industrial technologies for global environment. It was intended to exchange technological information between overseas researchers and Japanese researchers who are performing the advanced researches on the industrial technologies for global environment, and to proliferate the latest items of technological information. Therefore, seven international seminars have been held, including the '98 Japan-China Global Environment Protection Symposium, 'substance migration and carbon circulation in coral reefs', 'plant bio-technologies in the 21st century', and the Fourth International Forum for Environmental Catalysts. (NEDO)

  2. Fiscal 1999 engineer exchange project (field of coal mining technology), international exchange project. Domestic workshop; 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kokunai workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The domestic workshop invites Japanese engineers and engineers from coal producing countries for the exchange of coal mining technologies and aims to substantiate and facilitate the dispatching and receiving of engineers under training programs. The main subject of the Asia-Pacific coal technology workshop was 'Coal for the 21st century - resources and technology,' and there were two sessions held on September 8, titled 'Trends and tasks of coal resources exploitation' and 'Coal resources and production technology.' Lectures were delivered by five overseas and five Japanese coal engineering experts. On September 9, nine essays were presented concerning 'Coal resources and security problems' and 'Coal resources and environmental problems.' In addition, a panel discussion was held, titled 'Coal resources assessment and technology.' Importance was emphasized of the correct assessment of the magnitude of resources, development of probing technologies to collect more detailed information, improvement of digging speeds applicable to faces for large and high-efficiency mining, development of coal mining technologies for increased recovery, etc. Information was exchanged on various occasions and partnership was enhanced between the participants to the advantage of engineer exchanging projects in the future. (NEDO)

  3. Fiscal 1998 engineer interexchange project (coal mine technology field). International interexchange project (Workshop in Japan); 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya). Kokusai koryu jigyo (kokunai workshop)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This report summarizes the workshop and technical tour held in Japan for technical interexchange of domestic and overseas engineers. From the information obtained, the higher productivity of coal mines is dependent on selective mining under blessed geological conditions, however, basically establishment of an advanced management technique for inexpensive stable operation. Both preliminary collection of geological information and introduction of advanced facilities even under unstable conditions are necessary. The balance and optimization of the whole system, and an excellent human nature for operation are also essential. Use of roof bolt supports is diffusing as improvement technology of excavation speed and roof control technology over the world. However, for introduction of new technologies, collection of test results and various kinds of training are necessary. Methane gas in coal seams as the main theme of the Hokkaido workshop is a precious unused natural resource, and important for prevention of global warming and coal mine protection measures. Its use is dependent on development of gas drainage technology. (NEDO)

  4. Research report of FY 1997 on the clean coal technology promotion project and region model survey. Measures for environmental load reduction: feasibility survey on the environmental load reduction-type utilization Energy Center (interim report); 1997 nendo chosa hokokusho. Clean coal technology suishin jigyo chiiki model chosa `kankyo fuka teigen taisaku: kankyo fuka teigengata sekitan riyo energy center feasibility chosa` chosa hokokusho (chukan hokoku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The survey has given an eye to the coal that it can be easily burnt together with combustible waste and supplements unstable generation of waste. Thus, the establishment of the Energy Center at the place where infrastructure of coal will be arranged, a lot of combustible waste will be expected to generate and a considerable aniybt if energy will be used, has been planned, and this survey is intended to study the scale of Energy Center, its economy and the problems to be solved. In power plant project using RDF for above-mentioned local governments, the construction of power plant and the renewal time of the existing incinerator to RDF facility can be planned separately in this system. The power plant will be economically constructed and the amount of coal can be decreased in accordance with increased RDF to meet wide range of refuse treatment. In FY 1997, the actual situation of the waste treatment and the infrastructure of coal supply was surveyed, and selection of the place suitable for the Energy Center and its scale was studied. 69 figs., 50 tabs.

  5. Fiscal 1997 report on the model project for the effective energy consumption in developing countries. Survey of changes of energy conservation technology and environmental protection technology in the oil refining industry in Japan; 1997 nendo chosa hokokusho. Hatten tojokoku energy shohi koritsuka model jigyo (Nippon sekiyu seiseigyo ni okeru sho energy gijutsu to kankyo taisaku gijutsu no hensen chosa hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    For global scale measures to be taken for environmental protection, it becomes more and more important in the future to positively transfer and spread energy conservation technologies of Japan to overseas countries. Especially, it is effective for both economic growth in the Asian region and global environmental protection to transfer technologies which the oil refining industry has been developing and accumulating. Energy conservation in the oil refining industry means the energy conservation by strengthening the operational control at the first and second oil crises in the first stage, the energy conservation in the second stage which was accompanied by small and medium scale plant/equipment investments during several years after the first stage, and the energy conservation in the third stage which was accompanied by large scale investments from the first half of the 1980s to the present, resulting in improvement of 40% over before the first oil crisis. As to environmental protection measures, measures to reduce waste from oil refinery against air pollution and water pollution were prepared by the first half of the 1970s, and technologies were established of waste water treatment, flue gas desulfurization and denitrification. A lot of facilities for improvement of product quality and for low pollution were installed. In addition to environmental technologies, also in other industries, there were seen the heightening of thermal efficiency of kiln and thermal efficiency of cooling technique of clinker cooler in the cement industry and the improvement of productivity in the paper/pulp industry. 360 figs., 62 tabs.

  6. Report on achievements in fiscal 1998. Research and development of a technology to promote non-ferrous metal based material recycling. (Research on component technologies and a total system); 1998 nendo hitetsu kinzokukei sozai recycle sokushin gijutsu seika hokokusho. Kenkyu kaihatsu yoso gijutsu kenkyu, total system kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This project is intended to research and develop a high level aluminum recycling technology to realize the 'product to product' philosophy to return different aluminum scraps into the original materials, while attempting to develop and unify the aluminum recycling technologies and promote utilization of LNG. This fiscal year has studied the following methods as the component technology research: (1) an inclusion removing method, (2) a crystal sorting method, (3) a vacuum distillation method, and (4) a semi-melting method. The studies on (1), (2) and (3) were performed on identification of basic data and systematization to determine the life and facility specifications, with the full-swing demonstration tests being waited to start in fiscal 1999. The research and development on the item (4) was determined technologically feasible although additional discussions are required on the engineering aspect for practical application. The component technology study thereon will be finished with the current fiscal year. For the demonstration tests among the studies on total system technologies, the crystal sorting method and the vacuum distillation method had the achievements obtained in the research of the component technologies reflected directly to the facility design and fabrication. There has been no large-scale facility fabrication for the inclusion removing method and effective utilization of ash remaining in dross, and the researches were performed as scheduled. (NEDO)

  7. FY 1999 report on the comprehensive analysis of the geothermal development promotion survey. Forth. No.C-3 Akinomiya area (Separate volume 1: Forth survey); 1999 nendo chinetsu kaihatsu sokushin chosa sogo kaiseki hokokusho. No. C-3 Akinomiya chiiki (Dai 4 ji) - Bessatsu 1 (Dai 4 ji chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-01-01

    The paper reported the results of the long-term jetting test, etc. which were carried out as the forth survey of the geothermal development promotion survey in the Akinomiya area, Ogachi town, Akita prefecture. The jetting induction and the situation of production/reduction were described as follows. N9-AY-3 began to well spontaneously after being induced by sending air up to wellhead pressure of 4.8 MpaG. Damping was recognized for a month or so after the start of jetting. After that, however, no damping was recognized, nor was recognized the deterioration of the fluid enthalpy with age. The pH of geothermal water was definite, approximately 8, and the electric conductivity and Cl concentration were 8,500 {mu}S/cm and 2,600 mg/L, respectively. The maximum jetting capacity of N10-AY-8 was 10.4t/h in steam and 8.9t/h in geothermal water at wellhead pressure of 0.24 MPaG, and after that, it showed a tendency to lower. The flow rate of reduction of N8-AY-1 changed from 80-90t/h at the beginning to 60-70t/h. With the continued reduction, the lowering of reduction capacity was recognized. In the test, the following were carried out: temperature/pressure/spinner logging, test on pressure transition, survey of fluid properties, survey of jetting microseisms, etc. (NEDO)

  8. FY 1999 geothermal development promotion, development feasibility and commercialization technology studies. Report on the SWD method in No.B-5, Musadake area; 1999 nendo chinetsu kaihatsu sokushin chosa / kaihatsu kanosei chosa / jitsuyoka gijutsu chosa. SWD ho hokokusho (No.B-5 Busadake chiiki (N11-MD-3))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-02-01

    Commercialization feasibility of the SWD method has been tested and studied. This method uses a bit as the vibration source while a drilling is excavated, to collect information of geological structures and the like in front of the bit. In this study, the reflected and direct waves propagating from the drill bit while the N11-MD-3 drilling was excavated at the Busadake area were extracted and analyzed by the receivers installed on the surface of the earth, to estimate the default shapes which determine the geothermal structures. Analysis of the direct waves has statistically determined that the defaults are inclined at 81.5 degrees, based on the reasonable assumption. No reflection of the waves by the default plane was observed. However, it was observed that the waves were reflected by the stratum planes, when drilling was excavated to 1,006 and 1,008 m, and the results were used to map the reflecting planes. No reflecting planes with a default in-between was obtained, because of, e.g., limited depth sections and large stratum inclination. As a result, no default shape could be estimated. It is however confirmed that the SWD method produces reflected waves by bit signals even in a geothermal area, suggesting applicability of the method to default detection. (NEDO)

  9. Investigation into introduction and promotion of clean energy cars; Clean energy jidosha no donyu sokushin ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Gazing the introduction target for fiscal 2000 and 2010, the paper arranged comprehensively and systematically the trend in Japan and overseas of clean energy cars and described subjects. Themes of the study to be promoted in terms of electric cars are: Li secondary batteries, heightening of performance of batteries such as Ni-hydrogen, power generation/power storage hybridization to make the long-distance travel possible. For the price reduction, the body is so made as to make it possible to select three kinds of power unit, that is, gasoline, hybrid, and electricity. Low noise and easy operation are also important. As to natural gas vehicles, the price is more than three times as high as that of gasoline vehicles, and relaxation of the related regulations on metal tanks, the Road Traffic Act, etc. is necessary. It is indispensable to establish quantity production and technical standards and reduce cost by the remodeling for bi-fueling with gasoline engines, development of FRP tanks, etc. Methanol vehicles are the closest to gasoline vehicles, but the introduction is delayed having no groups for generalization. Solar and hydrogen cars are promising, but are on a stage of developing the basic technology. 43 figs., 104 tabs.

  10. Project in fiscal 2000 of developing international standards for supporting new industries. Standardization of method for evaluating thermal properties test on polymeric materials; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Kobunshi zairyo no netsutokusei shiken hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Targeting at proposing to ISO as an international standard, R and D has been performed on a method of the alternating current heating of the non-constant method, with regard to a method to evaluate the thermal properties test on polymeric materials in molten condition reflecting thin film polymeric materials, and the forming and processing technology. This paper summarizes the achievements in fiscal 2000. The current fiscal year has executed surveys on literatures related to thermal properties, development and commercialization of a measuring device, establishment of the measurement procedure, and putting some of the materials into database. The database was prepared mainly for heat diffusion rate and heat conductivity, wherein about 1000 items of information were collected. The temperature range of the measuring device revealed that stabilized data can be obtained from as low temperature as liquid nitrogen temperature to as high as 200 degrees C. The commercially available measuring device has no restrictions if the test sample thickness is from 1 mm to 100 mm, if the temperature range is from room temperature to 350 degrees C, if the temperature rising rate is from 0.01 to 5 K/min, and if the test sample form is film. Measurement at temperatures including those in the melting zone in the forming stage of each polymer has achieved as close result as having been called for in the initial objective. (NEDO)

  11. Project in fiscal 2000 of developing international standards for supporting new industries. Standardization of method for calculating recycling rate of automotive products; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Jidosha seihin no recycle ritsu no santei hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With international standardization as a target, research has been performed for three years since fiscal 1998 on a method for calculating the recycling rate of automotive products. This paper summarizes the achievements thereof. In fiscal 1998, studies were conducted on major automobile materials, state of recycling in Japan and Europe, and trial monitoring on recycling execution rate in the dismantling and shredding stages. Despite uncertainties that remain in recycling, the importance of standardization has been affirmed. Beginning in fiscal 1999, discussions have been given on requirements for establishing the recycling possibility by means of dismantling automobiles. In the requirements for establishing thermal recycling, discussions were given, taking into account the state of legal regulations in Germany and the trial execution of the container and packaging recycling law in Japan. As a result, the standard draft for the method for calculating the recycling rate was established for automotive products, including the method for calculating the recycling possibility rate, and the requirements for establishing thermal recycling. For international standardization of the method for calculating the recycling possibility rate, discussions have begun at ISO/TC22/WG10. (NEDO)

  12. Fiscal 1999 survey report on basic feasibility in implementing model project for efficient consumption of energy by fiber dyeing and processing plant in Indonesia; 1999 nendo Indonesia ni okeru senshoku kako kojo energy shohi koritsuka model jigyo kihonteki jisshi kanosei chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The basic feasibility of a model project was investigated for the purpose of introducing energy saving technology in dyeing and processing by the textile industry, which consumes a great deal of energy in Indonesia. This paper explains the result of fiscal 1999. A questionnaire survey was conducted on 40 companies having a continuous processing plant from spinning to finishing, while seven companies among them were visited for the survey on the status of energy consumption and conservation. Meantime, a survey was also made on the related policies and the state of their implementation in Indonesia as well as on the status of investment on equipment. As energy saving measures for the processing, proposals were made for energy saving in the washing process (exhaust-heat recovery system, monitoring system, and optimization of steam usage in drying process), for introduction of a heat pump system, and for reduced energy consumption in a jet dyeing machine. As energy conservation measures for utilities, reduced energy consumption of boilers was proposed, as was introduction of co-generation system. Essential for the dissemination of the measures are guidance, enlightenment and mentality reform for the entrepreneurs. Needed for the policy are the establishment of a core organization for energy conservation, plans, analyses, model projects, and introduction of an economic support system (e.g., low-interest loan). (NEDO)

  13. Project in fiscal 2000 of developing international standards for supporting new industries. Comprehensive surveys and researches in relation with promotion of international standardization; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Kokusai hyojunka suishin ni kakawaru sogo chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective of promoting the international standardization efficiently and strategically, surveys were performed on trends of international standardization in Europe and America, and researches on means for the international standardization. The standards strategy in the U.S. is to increase the U.S. competitive power in overseas countries, support strongly the domestic markets, and at the same time, deal with problems such as those of the environment. It attempts to structure a framework that can be utilized by any concerned parties, including business entities, the government, and consumers, whereas the National Standards Strategy (NSS) has proposed the initiative. In Europe, targeting to establish international standards originated from Europe, works are becoming more active for new technologies such as information communicating technologies from the R and D phase to the test and evaluation methods, taking the standardization into consideration. These works are being carried out within the scope of the common EU R and D, represented by the 'Framework program' and the 'EUREKA program'. In the survey and research on means to complete the international standardization, analyses and surveys were performed on the latest information, such as TC/SC, which are scheduled of proposition. Advices were given on giving the directionality and establishing the strategy. (NEDO)

  14. Project in fiscal 2000 of developing international standards for supporting new industries. Standardization of method for measuring fuel consumption of hybrid electric automobile; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Hybrid denki jidosha no nenpi sokutei hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With proposal of a standard draft to ISO as a target, R and D has been performed for three years since fiscal 1998 on a method for measuring fuel consumption of hybrid electric automobiles. This paper summarizes the achievements thereof. In the R and D, analyses were conducted on elements particular to a hybrid system considered to influence the fuel consumption, such as the remaining capacity in the main batteries, fuel consumption for regenerative braking, and effects on exhaust gas. As a result, it was revealed that correction is required for change in the remaining capacity in the main batteries before and after the test with regard to the fuel consumption, and that this is possible. Discussions were given on a method for fuel consumption test by using the driving modes adopted in Japan, America and Europe using four types of HEV having different hybrid systems and mounted batteries. Comparisons and discussions were given on the 'continuously repeated mode averaging method','primary approximation method' and 'SAEJ1711 and its test establishment criteria'. As a result, the primary approximation method was proved to be the best as the HEV fuel consumption test method. At the same time, necessity of standardizing the current measuring device and the measuring method was pointed out in the fuel consumption measurement using the primary approximation method and SAEJ1711. (NEDO)

  15. FY 1999 project on the development of new industry support type international standards. Standardization of methods to test/evaluate plastic optical fiber; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Plastic hikari fiber no shiken hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The experimental research was conducted with the aim of developing test/evaluation methods of plastic optical fiber (POF) and proposing a draft on the standards to IEC, and the FY 1999 results were outlined. In the study of the band measuring method, the equipment designed was compared/verified in the pulse method with the frequency sweep method equipment for quartz base optical fiber use to confirm the accordance. Effects were further studied of experimental conditions including exciting conditions. Also about the frequency sweep method, the same verification was made to see the accordance with POF measured values in the pulse method. In the analysis by theoretical calculation, obtained were the results by which the experimental results can almost be explained. In the experiment on the optical transmission, the bit-error-rate was measured by transmitting digital signals to POF. As a result, it was confirmed that there were close relations between the band width of POF, bit-error-rate and changes in receiving sensitivity. As to the above-mentioned band experimental method, strategy for standardization was studied, and the making of a draft on the standards was started which is to be proposed at the meeting of TC86/SC86/WG1. (NEDO)

  16. Research report for fiscal 1998. Evaluation and analysis of the collected data for the field tests on photovoltaic power generation systems for public facilities; 1998 nendo kokyo shisetsu nado yo taiyoko hatsuden field test jigyo ni okeru shushu data hyoka kaiseki kenkyu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The field tests on photovoltaic power generation systems for public facilities have begun in fiscal 1992 by NEDO. The systems including those under construction are installed in 116 sites. Analyses were given on 75 sites which have been operated up to fiscal 1996. Analyses of the operation characteristics were performed by using performance parameters derived by developing the basic expressions into each configuration element. For the insolation on slanted surface, the range from 3.0 to 4.5 kWh/m{sup 2}/D accounts for 65% of the total insolation. For the equivalent array operation time, the range from 2.5 to 4.0 h/D accounted for 81%. For the equivalent system operation time, the range from 9.0 to 12.0 h/D accounted for 85%. The range for inverter active efficiency from 0.84 to 0.96 accounted for 79%. The inverter load rate was accounted for 88% by 0.20 to 0.35. The output coefficient was accounted for 82% by 0.7 to 1.0 in the array, and 87% by 0.6 to 0.9 in the system. The power generation cost has decreased to 200 yen per kwh in fiscal 1995 from 340 yen per kwh in fiscal 1992, largely contributed by reduced installation cost. (NEDO)

  17. FY 2000 report on the basic survey to promote Joint Implementation, etc. Project for improvement of efficiency of the power generation/desalination plant in Aktau City; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Aktau shi hatsuden zosui plant koritsu kaizen jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of conserving energy and reducing greenhouse effect gas emission, feasibility study was conducted for improvement of efficiency of power generation/desalination facilities at MAEK Energy Center, Aktau City, Manghistau, Kazakhstan. Presently, the main facilities are the conventional natural gas fired power plant, evaporation type seawater desalination facility, hot water production facility, etc. In the project, introduction of the following was planned to be made: cogeneration facility composed of two units of 1,100-degree C class gas turbine and reverse osmosis (RO) type desalination facility for drinking water production with a capacity of 50,000 t/d. As a result of the study, the energy conservation amount in this project was 151,900-165,400 toe/y in power generation facility, and the greenhouse effect gas reduction amount was 355,000-387,000 t-CO2/y in power generation facility and 268,000 t-CO2/y in desalination facility. The construction cost and operational cost of the plant were 45.7 billion yen and 2.8 billion yen/y. In the economical estimation, ROI and ROE before tax were 7.4 and 34.8, respectively, which were considered to be appropriate values as social infrastructure related conditions. (NEDO)

  18. Report on the results of the fiscal 1997 international research cooperation project. `Joint R and D industrial base technology` (development of functionally graded materials); 1997 nendo kokusai kyoryoku jigyo. `Sangyo kiban gijutsu kyodo kenkyu kaihatsu` keisha kinosei zairyo no kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    For the purpose of developing functionally graded materials (FGM/LB) of thermal stress relaxation heat resistant large bulk state which are adoptable to high efficiency engine members, conducted in fiscal 1997 as intermediate target were the experiment for enlargement of the sintering process of FGM/LB with bore of up to 100mm, evaluation of physical properties, the basic development of the fabricating system facility for the commercialization. In the development of heat resistance use FGM/LB fabrication technology, to obtain ZrO2(3Y) stainless steel system FGM/LB, the following were fabricated in each bore size of 50-100mm by the research use large discharge plasma sintering machine: sintered bodies of ceramics/metal single substrate materials and mixed layer single substance materials, and FGM/LB sintered bodies without separation and crack which are composed of 9 intermediate graded layers. The survey was also made on the optimal composition and optimal sintering conditions toward the enlargement without unevenness. In the evaluation of physical properties, ZrO2(3Y)/stainless steel system was selected and test pieces were fabricated to obtain basic data on texture observation, distribution of hardness, fracture toughness, high temperature abrasion resistance, thermal expansion rates, etc. 27 refs., 108 figs., 43 tabs.

  19. Fiscal 2000 survey report. Survey for verification of new load levelling technique - IEA international joint project (Participation in IEA/DSM task); 2000 nendo fuka heijunka shuho jissho chosa hokokusho. IEA kokusai kyoryoku jigyo 'IEA/DSM task eno sanka ni tsuite'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Japan participated in IEA/DSM (International Energy Agency/demand side management) Task X (performance contracting) for collecting information on energy service contracting business designed to promote load levelling centered DSM activities on the basis of market principles for achieving efficient operation of facilities. Task X aims to adjust and popularize the energy service contracting business. In the energy service contracting business, the facility related party and the energy service related party work under a contract to enhance efficiency of facility operation, and share the gains between them. In concrete terms, information was collected and exchanged at the 14th and 15th executive committee meeting of IEA/DSM Task X (Turkey in April 2000, Sweden in September 2000); new task preparation conference (Sweden in September 2000); 1st specialist conference (France in February 2001); and 17th annual convention of All-America ESCO (energy service company) Council (U.S. in November 2000). (NEDO)

  20. Report on achievements in fiscal 1999. Environment harmonizing energy community survey project for Public Yatsushika Hospital area (large-scale cogeneration district heat supplying facility); Koritsu Yatsushika byoin chiku kankyo chowagata energy community chosa jigyo chosa hokokusho. Daikibo cogeneration chiiki netsu kyokyu shisetsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This survey is intended to utilize cogeneration to promote structuring a system to effectively utilize potential energy in a district. In connection with the total rebuilding plan for Yatsushika Hospital, a proposal was made on a cogeneration district heat supply system that could be introduced to six facilities in total including the hospital, its three ancillary facilities, and two neighboring facilities. The proposal is intended to evaluate energy conservation performance, environmentality, and economic performance of the system, and structure an optimal system. Two gas engines having the same capacity were selected as the driving source of the cogeneration system. The waste heat recovering system adopted the 'hot water plus steam recovery system'. Generators were selected that have high energy saving and overall cogeneration efficiency, power dependence, heat dependence, and waste heat utilization factor. As the countermeasures for heat load that cannot be taken care by the waste heat recovery alone, discussions were given on the cogeneration plus gas-burning absorption type cold-hot water device system (the system 1) and the cogeneration plus heat pump heat storing system (the system 2). As a result, the system 2 was selected as the optimal system because it uses both of LNG and commercial electric power effectively, and has stability against variation in fuel prices and excellent environmentality. (NEDO)

  1. Fiscal 2000 strategic surveys for respective technical fields. Hydrogen-based energy working group (Analysis of project results relating to hydrogen technology); 2000 nendo bun'yabetsu senryaku chosa hokokusho. Suisokei energy WG (Suiso kanren gijutsu ni kakawaru jigyo seika tou bunseki chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Attention is focused on the molten carbonate fuel cell (MCFC) technology which has enjoyed the largest number of industrial property applications out of hydrogen-related technologies under development by NEDO (New Energy and Industrial Technology Development Organization). The patent application is utilized as a tool for analysis, and endeavors are made to systematize and then analyze the correlations between the tasks to discharge and the results of studies in the process of MCFC development. Findings are described below. It is quite difficult to specify the technology involved by the study of patent abstracts. Since an applicant for patent is inclined to describe the application so that it will cover an extensive scope (or, so that the patent will be taken in a broad sense), it takes much time for researchers other than the applicant to specify the field of technological studies where the application originates. Such being the case, it cannot be easily determined whether or not a patent applied for by a private-sector corporation has its origin in a NEDO-implemented project. In addition, it is found that there is not necessarily a correlationship between the importance of a research and development goal and the number of patents generated. (NEDO)

  2. Fiscal 1999 technical achievement report. Research and development project on the quickly effective international standards creation (Standardization of information security system evaluating methods); 1999 nendo sokkogata kokusai hyojun sosei kenkyu kaihatsu jigyo seika hokokusho. Joho security system no hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For standardization under information security evaluation criteria, an evaluating technique CEM (Common Methodology for Information Technology Security Evaluation) was constructed as ISI/IEC15408. The method, however, is abstract in content and the evaluation work thereunder requires much time and accompanies economic difficulties. In dealing with the situation, investigations were conducted into security evaluation related techniques and manufacturing/quality control techniques in use at information processing product developing sites, and a CEM technique is materialized. Using the proposed technique, developers themselves can evaluate security in the development process and workloads imposed on evaluating organizations may be reduced because evidential items necessary for 3rd party evaluation may be gathered. Since the developed technique is verified by an official evaluating organization, it is expected to be an effective techniques not contradicting existing operating techniques. It may be also said that this technique is a method whereby developers will collect evidential items necessary for their development efforts. The result will be presented in the form of a proposal for an evaluating techniques standard for ISO/IEC JTC1 SC27. (NEDO)

  3. Fiscal 2000 achievement report on the venture business assisting type regional consortium - Minor business creation base type. Research and development of smart catheter for omnidirectional diagnosis; 2000 nendo chiiki consortium kenkyu kaihatsu jigyo seika hokokusho. Zenhoi shindan smart catheter no kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The aim is to develop a highly reliable device for detecting pathological developments deep inside the body by combining the pulse compression technique used in high performance radars and a quartz fiber. The project also aims to develop a system which, when compared with the conventional method, is capable of higher resolution at a short range and of reaching farther for the same resolution level. To be contrived for the development of a diagnostic catheter which combinedly uses the ultrasonic pulse compression and imaging technology and an optical picture system are a pulse signal reflection mirror for taking in ultrasonic picture data on the front and the sides in the lumen, an ultrasonic micromotor for rotating the mirror, and a high efficiency ultrasonic transducer similar in size to the waveguide for transmitting ultrasonic pulses to a quartz waveguide from outside the body and for receiving reflected signals. An effort is simultaneously exerted to make the diameter smaller of a quartz waveguide to be built in the catheter to provide a signal passage for the ultrasonic imaging system and the optical picture system for the realization of a catheter tip smaller and thinner as a whole. A study is made about a mechanical-electronic control system for easy luminal insertion. (NEDO)

  4. Achievement report for fiscal 1998. Energy consumption efficiency improvement model business for developing nations (Demonstration research project on new cooling system in cement clinker production); Hatten tojokoku energy shohi koritsuka model jigyo seika hokokusho. Cement clinker reikyaku sochi ni kakawaru jissho kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The project aims at energy saving and CO2 emission reduction for a clinker cooling system (CCS), and a demonstration test was conducted at a demonstration cement plant in Indonesia. The plant started operation using the new CCS aiming for the enhancement of cooling and heat recovery efficiency. The actually achieved heat recovery efficiency attributable to the adoption of the new CCS was 60.8% against the target of 68%, this meaning an improvement of 8% over the value recorded prior to the new CCS adoption. As for increase in recovered heat due to heat recovery efficiency improvement of the CCS itself, it was 31kcal/kg-clinker. The heat reduction rate throughout the system thanks to the new CCS was 40kcal/kg-clinker. The kiln secondary air temperature increased for improved burner combustion performance for a rise of the clinker burning degree to 12kcal/kg in terms of calorie, and thus a reduction of 52kcal/kg-clinker in total was achieved. No mechanical trouble was reported with the new CCS. Investigations were conducted into cement supply/demand and technological trends in Indonesia, Vietnam, and China. Learnings from the investigation of German cement making technologies were fully utilized in the designing of the new system. (NEDO)

  5. Achievement report for fiscal 1999 on the development of total evaluation research laboratory system for the medical welfare equipment technology research and development project; 1999 nendo iryo fukushi kiki gijutsu kenkyu kaihatsu project yo sogo hyoka kenkyu rabo system kaihatsu jigyo seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-05-01

    A laboratory system named above has been developed to propel forward efficiently the efforts to develop medical welfare technologies through close coordination between medicine and engineering. Six laboratories are linked with each other in a network for the realization of an environment in which general support is extended to all the stages of equipment development from basic through clinical assessment. The biomedical engineering laboratory is constituted of various analyzing devices, and is capable of in vitro assessment of bioingredients. The therapeutic laboratory is provided with bioinformation/NMR (nuclear magnetic resonance) measurement equipment, animal surgical operation equipment, etc., and performs the assessment of test animals at the first stage of clinical assessment. The diagnostic laboratory acquires various image data necessary for the development of medical equipment at the same level as that of the site of clinical diagnosis. The intelligent surgical operation room takes in real-time diagnostic images while a surgical operation is under way and, at the same time, assesses surgical devices in the same environment as that of the surgical operation room. The medical information laboratory accumulates medical and image data from the other laboratories, and integrates the accumulated data. The data management center manages the laboratories in a unified way and enables comprehensive assessment and research. (NEDO)

  6. FY 2000 Project of developing international standards for supporting new industries. Standardization of the crushed, recycled CFRPs (carbon-fiber reinforced plastics); 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Recycle CFRP (tanso sen'i kyoka plastic) funsaihin no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Described herein are the FY 2000 results of development of the basic technologies for, e.g., recycling CFRPs by crushing/screening them and also recycling carbon fibers by removing the matrices; development of the methods of measuring characteristics of the recycled stock materials; and standardization of the specifications, for proposing the international standards. The program for methods of crushing CFRPs tests the cylindrical CFRP samples (thickness: approximately 7mm) composed of high-strength carbon fibers and epoxy resin, to confirm feasibility of crushing by a shear type crusher. The program for removing the CFRP matrices studies epoxy resin as the representative thermosetting resin matrix material, to confirm that the matrix can be removed basically without greatly deteriorating strength of the carbon fibers by selecting an adequate catalyst and treating conditions. The program for studying the international standards finds neither international standard dedicated only for recycling CFRPs nor movement for establishing them. (NEDO)

  7. Project in fiscal 2000 of developing international standards for supporting new industries. Comprehensive surveys and researches in relation with promotion of international standardization; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Kokusai hyojunka suishin ni kakawaru sogo chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective of promoting the international standardization efficiently and strategically, surveys were performed on trends of international standardization in Europe and America, and researches on means for the international standardization. The standards strategy in the U.S. is to increase the U.S. competitive power in overseas countries, support strongly the domestic markets, and at the same time, deal with problems such as those of the environment. It attempts to structure a framework that can be utilized by any concerned parties, including business entities, the government, and consumers, whereas the National Standards Strategy (NSS) has proposed the initiative. In Europe, targeting to establish international standards originated from Europe, works are becoming more active for new technologies such as information communicating technologies from the R and D phase to the test and evaluation methods, taking the standardization into consideration. These works are being carried out within the scope of the common EU R and D, represented by the 'Framework program' and the 'EUREKA program'. In the survey and research on means to complete the international standardization, analyses and surveys were performed on the latest information, such as TC/SC, which are scheduled of proposition. Advices were given on giving the directionality and establishing the strategy. (NEDO)

  8. Research and development of technologies for CO{sub 2} fixation and effective utilization thereof, etc., in fiscal 1998. Report on research and development of technologies for the effective use of CO{sub 2} by virtue of contact hydrogenation (CO{sub 2} separation and recovery system of the next-generation type); 1998 nendo nisanka tanso koteika yuko riyo gijutsu nado kenkyu kaihatsu jigyo. Sesshoku suisoka hanno riyo nisanka tanso yuko riyo gijutsu kenkyu kaihatsu jigyo kenkyu kaihatsu jigyo (jisedaigata shoene CO{sub 2} bunri kaishu system ni kansuru chosa kenkyu hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Researches were conducted for the goal of proposing a totally new process enhanced in efficiency and energy saving, and capable of CO2 separation. In fiscal 1997, hydrocarbon materials were reformed by oxygen separated within a system allowing fuel cells to generate power efficiently, when all the emitted CO2 was separated and recovered within the system. Furthermore, cold heat was utilized for the acquisition of liquefied CO2 gas products. A part of oxygen separated at the fuel cell cathode was recycled into the combustion section external to the tubular reaction reformer, and CO2 was separated by mere cooling from the combustion products for the simultaneous production of by-products such as high-purity nitrogen gas and liquefied CO2 for a great improvement in economy. In fiscal 1998, the system was improved. Proposed then was a new system in which an oxygen partial oxidation type reformer assumed the nuclear role, separating all the oxygen at the cathode, reusing part thereof for oxygen enrichment, and feeding the rest thereof into the reformer. The design realized the recycling of the whole of the products of the two cell electrodes into the reformer for the maximum reuse of the products of the hydrogen/oxygen separation function. (NEDO)

  9. FY 2000 international exchange project on exchanges of engineers - Coal mine technology field. Overseas workshop (Indonesia); 2000 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop (Indonesia)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of making effective technology exchanges and surveying levels of technology in Indonesia and the needs and possibilities of technology transfer from Japan, workshop was held in Jakarta city on March 1, 2001. Subjects were the following seven: subjects on coal resource and technical strategy in the 21st century, challenge in coal development in Indonesia, geological structure survey at Tanjung Enim coal mine, waste water treatment in Indonesia, outlook for underground mining coal mines, joint research on the centralized monitoring system, and introduction of the optimum high wall coal mining system into open pit mining coal mines in Indonesia. The coal production amount in Indonesia was 75 million tons, and the domestic demand was 22 million tons. Japan imported 14 million tons from Indonesia. In coal mines in Indonesia, most of the coal preparation plants have no waste water treatment facilities. Considering that waste water treatment facilities are necessary for the plants in future, the joint research was made on the simple coal preparation waste water treatment system. (NEDO)

  10. FY 2000 international exchange project on exchanges of engineers - Coal mine technology field. Overseas workshop (China); 2000 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop (Chugoku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of making technical exchanges with coal mine related engineers in China and surveying levels of coal production technology and the needs in China and possibilities of technology transfer from Japan, workshop was held and technical tours were made. On December 13, 2000, a workshop was held in China which was named 'Japan-China Joint Coal Project Workshop: Environment/Production/Security.' Participants were 112 including 16 from Japan and 96 from China. Subjects were as follows: subjects on coal resource and technical strategy in the 21st century, technical exchange project and technical development, Japan-China technical cooperation project, report on the operational situation of China Coal Industry Environmental Preservation Safety Training Center, Japan-China Joint Project on spontaneous combustion prevention technology, CMG recovery/utilization system joint demonstration project, Japan-China joint coal exploration project, Japan-China coal field geology joint exploration project, etc. (NEDO)

  11. International exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998. Overseas workshop; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The international exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998, the 'Overseas workshop' has performed exchange in technologies with Australian coal mine engineers. The project refers to the Australian technological levels and needs in coal production, safety control and environment, as well as transfer of the Japanese coal mine technologies. This report summarizes the result of a survey on the engineer exchange project in the coal mine technology area and the possibility of joint researches. The 'overseas workshop' was held in November 1998 for two days in Brisbane City in QLD Province as the 'Japan-Australia coal technology workshop'. The 'Japan-Australia coal technology workshop' gave lectures in five sessions (the basic lecture, Japan-Australia high-speed excavation project, coal mine gas control project, exploration and resources, and development and experience of Japan). It also discussed two themes (mine safety management and rules, and greenhouse effect gases and coal mining). Two coal mines were visited thereafter to deepen the exchange with the Australian coal mine engineers. (NEDO)

  12. Achievement report for fiscal 1999 on development of technology to promote reduction of discharge of dioxins. Development of technology to reduce discharge of dioxins in steel manufacturing processes; 1999 nendo dioxin rui haishutsu sakugen sokushin gijutsu kaihatsu seika hokokusho. Seiko kotei ni okeru dioxin rui haishutsu sakugen gijutsu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Research and development has been performed on a scrap melting process to make dioxins emission concentration to 0.2 ng-TEQ/Nm{sup 3} or less in steel making electric furnaces. The testing facility is of semi-sealed structure, consisting of an arc dissolution furnace, an exhaust gas combustion section, an auxiliary combustion chamber, and a quenching chamber. In the arc dissolution chamber, oxygen and coke are blown in at the same time as turning the arc power supply on, and then secondary combustion air was blown in to burn carbon monoxide gas generated from steel melting. The temperature was raised to about 850 degrees C at which dioxins are decomposed in the auxiliary combustion chamber, and then quenched to 200 degrees C or lower in the quenching chamber to prevent recombination of dioxins. As a result of the test, the exhaust gas temperature after the combustion was estimated to have reached about 900 degrees C at which dioxins are decomposed. In addition, because it was possible to control the exhaust gas temperature at the outlet of the auxiliary combustion chamber to about 850 degrees C and the exhaust gas temperature at the outlet of the quenching chamber to 200 degrees C or lower, the dioxins concentration at the outlet of the quenching chamber was reduced successfully to the targeted value or lower. (NEDO)

  13. Report on survey in fiscal 1999 for promotion of geothermal development. Supplementary survey on data processing (fluid inclusion test) for Tsujinodake Area No. B-6; 1998 nendo chinetsu kaihatsu sokushin chosa hokokusho. Data shori ni kakawaru hosoku chosa (ryutai gan'yubutsu shiken nado) No.B-6 Tsujinodake chiiki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-10-01

    This paper reports the fluid inclusion test in the Tsujinodake area in fiscal 1998 for the survey on promotion of geothermal development. The fluid inclusions were classified into three types: those with the maximum value or the average value of the homogenizing temperature agreeing nearly with the saturated boiling curve, those with the homogenizing temperature showing the interim temperature between the present well temperature and the saturated boiling curve, and those agreeing nearly with the present well temperature. It is presumed that the bed temperatures in depths of 1,125.30 m and 1,427.50 m have changed very little since after formation of the present circulating and flowing systems of geothermal waters until now. In contrast at the depth of 1,691.75 m, the bed temperature was estimated to have fallen slightly from that in the most active period of the geothermal water activities. As a result of the rock age measurement, it is estimated that, in the Nansatsu bed groups distributing around the N10-TD-1 well, the temperature has fallen gradually after having been subjected to hot water alteration actions at higher than 200 degrees C, and cooling has taken place down to 200 to 250 degrees C as the fission track date temperature of zircon in the relatively late period (about several hundred thousand years before). There should have been no thermal change that affects the age measurement up to now since then. (NEDO)

  14. Report on joint research in fiscal 1999. Research and development of technology to promote recycling of non-ferrous metal materials (Report on achievement in researches of demonstration tests and total system technology); 1999 nendo hitetsu kinzokukei sozai recycle sokushin gijutsu seika hokokusho. Jissho shiken kenkyu, total system gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Development has been in progress on promotion of recycling the non-ferrous metal materials, particularly aluminum, base metals and rare metals (such as copper). For aluminum, researches were made on demonstration of the crystal separation process, vacuum deposition process, molten scrap cleaning technology, and residual dross utilizing technology. In the crystal separation process to remove Fe and Si, and the vacuum deposition process to remove Zn, trial operation and adjustments were performed on the demonstration and testing facilities, making simulation in the scale of 1000 tons a month possible. In the molten scrap cleaning technology, discussions were given on a method to install on the trough a filter permitting micro inclusions in the molten scrap, but no results as have been expected were obtained. The residual dross was used on a trial basis for applications such as road aggregate and refractory materials. In the exhaust treatment, it was recognized effective that activated carbon and slaked lime are used simultaneously to remove hydrochloric acid and dioxins. In developing a technology to regenerate high-grade copper from sludge dust, discussions were given on design, fabrication, and trial operation of the demonstration facilities, partly by using a demonstration plant, with regard to the five related technologies including a technology for high precision refining of scraps, and high-speed metal melting technology. (NEDO)

  15. Research and development project plans for FY 1995; 1995 nendo kenkyu kaihatsu jigyo keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The present research and development project plans for FY 1995 administrated by NEDO consist of research and development of new energy, and research and development of industrial technology. Are illustrated further enhancement of new energy introduction promotion measures, new stage of international projects, promotion of new energy and new energy technology development, further enhancement of industrial and scientific technology research and development, integrated measures against global and urban environment problems, and budget of NEDO projects in FY 1995. The research and development of new energy includes coal conversion technology, solar energy technology, geothermal energy technology, energy conversion and storage technology, hydrogen, alcohol and biomass energy technology, geothermal energy resources, coal resources development, new energy promotion department activities, NEDO information center activities, and so on. On the other hand, the research and development of industrial technology includes research and development of industrial technology, and global environment technology. The research and development of industrial technology consists of superconductivity, new materials, biotechnology, electronics, information and communications, machinery and aerospace, natural resources, humanity, life and society, and various leading researches.

  16. Joint verification project on environmentally friendly coal utilization systems. Joint verification project on the water-saving coal preparation system; Kankyo chowagata sekitan riyo system kyodo jissho jigyo. Shosuigata sentan system kyodo jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    In this verification project, clean technology which should be spread in China was verified and the base structure for its spread was prepared for the purpose of controlling emissions of environmental pollutants associated with the coal utilization in China and of contributing to secure energy acquisition of Japan. As joint verification projects, a general rehabilitation type coal preparation system was installed in the Wangfenggang coal preparation plant, and a central control coal preparation system was installed in the Qingtan coal preparation plant. In the former, a system is verified in which optimum operation, water-saving, high quality, and heightening of efficiency can be obtained by introducing two computing systems for operation control and quality control, various measuring instruments, and analyzers to coal preparation plants where analog operation is conducted helped by Russia and Porland and have problems about quality control. In the latter, a central control system achieving water saving is verified by introducing rapid ash meters, scales, desitometers and computers to coal preparation plants having zigzag or heavy-fluid cyclon and connecting various kinds of information through network. For fiscal 1994, investigation and study were conducted. 51 figs., 9 tabs.

  17. International exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998. Overseas workshop; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The international exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998, the 'Overseas workshop' has performed exchange in technologies with Australian coal mine engineers. The project refers to the Australian technological levels and needs in coal production, safety control and environment, as well as transfer of the Japanese coal mine technologies. This report summarizes the result of a survey on the engineer exchange project in the coal mine technology area and the possibility of joint researches. The 'overseas workshop' was held in November 1998 for two days in Brisbane City in QLD Province as the 'Japan-Australia coal technology workshop'. The 'Japan-Australia coal technology workshop' gave lectures in five sessions (the basic lecture, Japan-Australia high-speed excavation project, coal mine gas control project, exploration and resources, and development and experience of Japan). It also discussed two themes (mine safety management and rules, and greenhouse effect gases and coal mining). Two coal mines were visited thereafter to deepen the exchange with the Australian coal mine engineers. (NEDO)

  18. Fiscal 2000 survey report. High-efficiency energy system introduction promotion project for houses and structures - Houses (Technical classification tables prepared by analysis of proposed systems, and comments on the same); 2000 nendo jutaku kenchikubutsu kokoritsu energy system donyu sokushin jigyo (jutaku ni kakawaru mono) teian system no bunseki ni yoru gijutsu bunruihyo oyobi dokaisetsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    As an energy conservation promotion measure, a project is under development for introducing and subsidizing high-efficiency energy systems and for letting their effect known publicly and widely. The number of proposed energy systems has increased greatly and technical divisions to follow in classifying them have become vague, from which problems are now arising over the execution of follow-up checks and the maintenance of fair treatment. In the effort to solve this problem, 376 propositions are analyzed and classified, a technical classification method is proposed, and an instruction manual on the method is compiled. The classification involves (1) proposed classification, (2) variation, (3) energy reduction rate, and (4) tentatively calculated cost. Item (1) deals with the basic classification (air-conditioning, ventilation, and hot water supply, and, to be considered in combination with them, options which are cooking, illumination, and others) and, item (2) covers eight items such as new/old construction, structure, and structural frame. In Chapter 1 of the report, the 376 propositions are put in order according to common classification items and an original classification table is prepared. In Chapter 2, the goals are clarified and the classification principles are defined. In Chapter 3, the classification is checked for its validity and some realistic ways of grouping are described. In Chapter 4, a classification implementation flow chart is shown. (NEDO)

  19. Fiscal 1998 intellectual infrastructure project utilizing civil sector functions. Research and development project on prompt-effect type intellectual infrastructure creation (Research and development concerning relations between sintered body textural structure and material characteristics in fine ceramics); 1998 nendo minkan no kino wo katsuyoshita chiteki kiban jigyo seika hokokusho. Sokkogata chiteki kiban sosei kenkyu kaihatsu jigyo (fine ceramics no shoketsutai soshiki kozo to zairyo tokusei tono kankei ni kansuru kenkyu kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Research and development was carried out involving fine ceramic sintered body textural structure evaluation methods for the development of process technologies for achieving higher quality and lower cost. Studies centered about a method for evaluating coarse pores and coarse grains in sintered bodies, relations between sintered body fracture strength and textural structure, and the standardization of evaluation methods. As the result, an evaluation method for observing pore structures in a sintered body flake specimen under an optical microscope and another for observing coarse grains under a polarization microscope were proposed. As for the effect of coarse defects on the fracture strength of ceramics, it was demonstrated experimentally and theoretically that coarse defects several tens of micrometers in size greatly affected the fracture strength. In the study of methods for sintered body grain size evaluation, findings were obtained about the processing of the specimen surface. (NEDO)

  20. FY 2000 Research and development project for creation of the standards. Standardization of information-providing technologies for establishing human/machine interfaces; 2000 nendo kijun sosei kenkyu kaihatsu jigyo seika hokokusho. Hito to kikai no interface kochiku no tame no joho teikyo gijutsu ni kansuru hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    This survey/test/research project is aimed at standardization of providing information smoothly while securing safety for various types of drivers by introducing advanced technologies into vehicles.The methods of evaluating priorities of 105 items of information for drivers, which are taken up by ISO, are followed to find that 5.90, 2.05 and 0.11 items are selected for the alarm, route guiding and general information systems, respectively. These results are in agreement with the related literature survey results. The test results of the visual/auditory displays corresponding to the priority information types indicate that the adequate alarm displays are 'red/50nt/0.2 seconds, 30% frequency/6.0 degrees' for the visual sensation, and '80dB/2.0KHz+1.5 harmonics/0.2 seconds, 70% frequency' for the auditory sensation. The study on information volume and information recognizing time indicates that the symbol pattern is better than the letter pattern for the simultaneous display of up to 2 items learned beforehand. The others studied include alarm designs and management of two or more alarms. (NEDO)

  1. FY 1999 project on the development of new industry support type international standards. Standardization of a method to calculate recycling rates of automobile products; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Jidosha seihin no recycle ritsu no santei hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose not only of solving the environmental problem but also of making effective use of resources and contributing to the appropriate treatment in the stage of the used resource, study was conducted of the standardization of a method to calculate recycle rates of automobile products. The FY 1999 results were summarized. In this fiscal year, to give definition of the recycle potentiality and thermal recycle, the following were proceeded with: trial evaluation of recycle potentiality, survey of the actual state of recycling of rubber/plastic parts, study of the requirements to realize the recycle potentiality, study of the requirements to realize the thermal recycle, and approaches to the international standardization. As to the trial evaluation of the recycle potentiality, tests to dismantle automobiles were made to assess the dismantlement, separation and recognition. The requirements to realize the recycle potentiality were studied. It was found out that few non-metallic materials are not recycled in the present situation. The paper studied what the requirements to realize the recycle potentiality and thermal recycle should be like basically since there is no recognition internationally unified. (NEDO)

  2. FY 1999 project on the development of new industry support type international standards. Standardization of evaluation method of the genetic testing system (Separate volume); 1999 nendo shinki sangyo shiengata kokusai hyojunka kaihatsu jigyo seika hokokusho. Idenshi kensa system no hyoka hoho no hyojunka (bessatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The separate volume included the proceedings of the re-consignee joint meeting on the standardization of evaluation method of the genetic testing system, the proceedings/data of the meeting of the committee of the standardization of evaluation method of the genetic testing system, etc. The data of the meeting are about a plan to execute the standardization of evaluation method of the genetic testing system, standardization of forms for reporting the results of the genetic test, a trial guideline for standardization of the genetic testing, standardization of evaluation method of the genetic testing system, etc. Moreover, the volume included 11 literature papers overseas on the above-mentioned themes, 'reports on the surveys in Europe and the U.S. on the standardization of evaluation method of the genetic testing system,' etc. (NEDO)

  3. Achievement report for fiscal 1999 (edition B) on auxiliary New Sunshine Project. Development of coal hydrogasification technology (Research by using experimental device); 1999 nendo New Sunshine keikaku hojo jigyo seika hokokusho (B ban). Sekitan suiso tenka gaska gijutsu kaihatsu - Jikken sochi ni yoru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    With an objective of using practically the coal hydrogasification technology (the ARCH process), developmental research has been performed on important elementary technologies using different experimental devices. This paper summarizes the achievements in fiscal 1999. In the research by using a small testing apparatus, the Taiheiyo coal was used to have performed demonstration operation on the replacement natural maximized case, the heat efficiency maximized case, and the BTX maximized case. As a result, the three cases were found nearly as anticipated in the simulation, whereas the replacement natural gas maximized case has achieved the targeted whole coal conversion rate of 60% or more. However, the BTX maximized case presented a value lower than the targeted BTX yield of 12%. In the developmental research on the injector, the injector having been fabricated for the hot model test was given another combustion test, where the focal temperature of 1,200 degree C or higher was derived. The hot model test has verified the non-agglomeration performance of coal by using as parameters the focal temperatures, coal cross sectional area loads, coal types, and injectors. It was verified that the Taiheiyo and Shin Mu coals do not agglomerate excessively. (NEDO)

  4. Fiscal 2000 regional consortium research and development project - regional new technology creation research and development. Development of bio-recycling technology for bio-wastes; 2000 nendo chiiki consortium kenkyu kaihatsu jigyo - chiiki shingijutsu soshutsu kenkyu kaihatsu seika hokokusho. Seibutsukei haikibutsu no bio recycle gijutsu no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Efforts are exerted to develop a closed brewing system for 'shochu (a Japanese distilled liquor)' and vinegar and a non-combustion type thermal recycling system based on the methane fermentation of farm animal's excretion and sludge. Activities are conducted in the three fields of (1) the development of a zero emission shochu and vinegar brewing process, (2) development of a non-combustion type thermal recycling method, and (3) a commercialization plan. Studied in field (1) are the brewing of 'shochu' by a new process (kaeshi-shikomi), preparation of vinegar out of the lees of 'shochu' brewing, evaluation of the physiological activity of vinegar and 'shochu' lees, cost efficiency evaluation of zero emission 'shochu' and vinegar brewing processes, and the like. In field (2), the methane fermentation conditions for garbage, sludge, and farm animals' excretion are studied, and a non-combustion type thermal recycling process and the like are evaluated for cost efficiency. In field (3), marketability is studied for vinegar made by fermentation, actualities of the recycling of bio-wastes and energy recovery therefrom are examined, and marketability is studied for regional distributed power generation. (NEDO)

  5. Fiscal 1999 technical research report. Development project on prompt-effect international standards for developing new industry (Comprehensive survey and research concerning promotion of international standardization); 1999 nendo shinki sangyo ikusei sokkogata kokusai hyojun kaihatsu jigyo seika hokokusho. Kokusai hyojunka suishin ni kakawaru sogo chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For encouraging the promotion of international standardization involving the six subjects of advanced technology taken up under the above-named project, wide-range investigations are conducted into measures for international standardization, the activities of international standardizing agencies and organizations, and the approaches of European and American business corporations to this issue. Technical literature and material are studied in Japan, and interviews are held overseas with responsible persons at organizations and corporations engaged in this task. At Standards Development Organization (SDO) of America, verification tests are under way for early development into international standards of technical standards it has so far developed independently. For the strategical utilization of intellectual property incorporated into its technical standards, SDO accepts that the best policy is to win approvals from patent proprietors at the early stage of standardization process by presenting them with conditions about patent implementation. In Europe and America, for the enhancement of their competitive power in the international theater, governments and civil sectors cooperate with each other for the establishment of international standards and, in business corporations, the management takes the initiative in coping with the issue with an understanding that there are business opportunities in international standardization. (NEDO)

  6. Fiscal 1999 survey report on basic feasibility concerning model project for energy conservation in fiber dyeing and processing industry in Thailand; 1999 nendo Tai ni okeru sen'i senshoku kako sangyo no sho energy ka model jigyo ni kakawaru kihonteki jisshi kanosei chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A feasibility study was conducted for the implementation of the optimum model project in the fiber dyeing and processing industry in Thailand. This paper describes the results of fiscal 1999. Seventy percent of about 400 companies are those heavily consuming energy, while small-scale businesses having a production capacity of less than one million yards/month take the sixty percent of the industry. Their energy conserving measures are behind. Measures against ground subsidence and drainage cost these companies greatly. Trade competition with China and others is being intensified. Although designated under the Energy Saving Promotion Act, the plants are not enjoying the privilege. Needed for the energy saving measures are grasp of the current situation such as energy consumption status, thorough operation management, improvement of energy efficiency in the present production facilities, renewal/additional installation of production equipment, and implementation of developmental energy saving measures. As energy conservation measures are deemed adaptable to the industry if the investment recovery period is two years or less, diagnostic analysis was made on six plants, with diffusion of the result examined. The total energy consumption of the industry was estimated to be reducible by 35% through high-recovery-rate measures such as improvement of boilers, recovery of exhaust heat, control of energy consumption rate, and introduction of dyeing machines having low liquor ratio. (NEDO)

  7. FY 1999 project on the development of new industry support type international standards. Standardization of digital image processing in household digital electronic devices; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Kateiyo digital denshi kiki ni okeru digital gazo shori no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    As a framework of the processing of intellectual properties concerning the mobile videophone use coding system, MPEG-4, the paper took up the Intellectual Property Management and Protection (IPMP) framework, discussed a proposal for the standardization aiming at expanding IPMP functions, and summed up the FY 1999 results. In the activities of MPEG-4PF project in this fiscal year, four of the tools from Japan were extracted as candidates of the powerful tool which belongs to 'Simple and Core' of MPEG-4Visual and profile of MPEG-4Audio, and the international standardization was promoted. Especially, attention was paid to the mobile, promotion was made as a tool effective for heightening error resistance, and all the proposals were adopted. Further, attention was paid to the security field, and a proposal was made for IPMP expansion. The expansion makes up defects of the IPMP system which had already been proposed as a candidate for standardization. For the intensive discussion for this, a special work team was set up, and a special meeting was held at Tokyo University. (NEDO)

  8. FY 1999 project on the development of new industry support type international standards. Standardization of a production process system (development of STEP standards); 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Seisan process system no hyojunka (STEP kiban kikaku no kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The R and D were carried out of the standards of assembly models in design-production process and machining process data models for production preparation, and the FY 1999 results were summarized. Integrated AAM is a reference model to make relations with AP clear, and therefore, study was made with much higher accuracy. As to resource models to express product models which make change in design possible, studied were measures for changes in shape/dimension of parts, measures for changes related to connection in assembly, etc. As to resource models required to express the process of changes from design models to production models, arrangement was made of characteristics of the shape of design models and characteristics of production process models, and study was made of models to express the seamless work from design to processing. Study was also made of the method of conversion among design models and production preparation models. The results obtained were reported as N830 and N448 of ISOTC184/SC4/WG3. (NEDO)

  9. Fiscal 2000 survey report on rationalization project for international energy conservation. Preparation of master plan for rational energy consumption (Shanxi Province, China); 2000 nendo kokuasi energy shiyo gorika kiban seibi jigyo chosa hokokusho. Goriteki energy shiyo no tame no master plan sakusei (Chugoku Shanxi sho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A comprehensive master plan for Shanxi Province was prepared jointly with China for the purpose of promoting rational use of energy and realizing an environmentally harmonious demand/supply structure of energy. This paper describes the fiscal 2000 results. The first phase refers to the surmounting of environmental problems incident to the use of coal and the restoration of regional economy. As countermeasures against air pollution in Taiyuan City, environmental measures were propagated such as simplified flue-gas desulfurization in thermal power plants, energy conservation in coke dry quenching, etc., and desulfurization of coke oven gas. Bio-briquette effective against smoke and soot pollution was carried out, as was general rubbish treatment (e.g., compost and coal/rubbish mixed combustion power generation). Promoted, by the opening of a clean coal center, were sulfur content reduction, coal briquette method, market expansion for CWM, etc. Producing city gas out of coal mine methane gas was also among the ideas considered. With the aim of attaining a Shanxi Province zero emission program, incentives are essential and, for this purpose, support by the national government is desirable including subsidies for investment, low-interest loans, tax deductions/exemptions, and yen-denominated loans from Japan. The second phase is intended for harmony with culture/science/nature, control of global warming and advanced utilization of coal. (NEDO)

  10. Fiscal 2000 regional consortium research and development project - regional new technology creation research and development. Development of bio-recycling technology for bio-wastes; 2000 nendo chiiki consortium kenkyu kaihatsu jigyo - chiiki shingijutsu soshutsu kenkyu kaihatsu seika hokokusho. Seibutsukei haikibutsu no bio recycle gijutsu no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Efforts are exerted to develop a closed brewing system for 'shochu (a Japanese distilled liquor)' and vinegar and a non-combustion type thermal recycling system based on the methane fermentation of farm animal's excretion and sludge. Activities are conducted in the three fields of (1) the development of a zero emission shochu and vinegar brewing process, (2) development of a non-combustion type thermal recycling method, and (3) a commercialization plan. Studied in field (1) are the brewing of 'shochu' by a new process (kaeshi-shikomi), preparation of vinegar out of the lees of 'shochu' brewing, evaluation of the physiological activity of vinegar and 'shochu' lees, cost efficiency evaluation of zero emission 'shochu' and vinegar brewing processes, and the like. In field (2), the methane fermentation conditions for garbage, sludge, and farm animals' excretion are studied, and a non-combustion type thermal recycling process and the like are evaluated for cost efficiency. In field (3), marketability is studied for vinegar made by fermentation, actualities of the recycling of bio-wastes and energy recovery therefrom are examined, and marketability is studied for regional distributed power generation. (NEDO)

  11. Achievement report for fiscal 1999 on auxiliary New Sunshine Project. Development of coal hydrogasification technology (Survey and research on its social acceptability); 1999 nendo New Sunshine keikaku hojo jigyo seika hokokusho. Sekitan suiso tenka gaska gijutsu kaihatsu - Shakai tekigo sei ni kansuru chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    With an objective to evaluate feasibility of practical use and economy of the coal hydrogasification technology (the ARCH process), survey and research have been performed. This paper summarizes the achievements in fiscal 1999. In the survey on the social acceptability, survey has been made on the future trend in the demand and supply and the price of LNG, LPG, and coal for hydrogasification. As a result, it was discovered that the price of LNG imported into Japan is determined as if linked with the crude oil price, and Saudi Arabia is the price leader of the LPG price. With respect to the survey on the possibility of international cooperation, surveys were conducted on the prospects of the long-term demand and supply in China, natural gas resources, and the demand and supply thereof. The feasibility study has estimated the product gas manufacturing cost after the process has been improved. In the trial calculation on the three-mode cost, it was discovered that, although the profit from byproducts is great, the BTX maximized mode causes the manufacturing cost to be higher by as much as 2 to 3 yen per Nm{sup 3} than that of other modes because of higher unit consumption in raw materials and higher construction cost. (NEDO)

  12. FY 1999 project on the development of new industry support type international standards. Standardization of evaluation method of the genetic testing system (Separate volume); 1999 nendo shinki sangyo shiengata kokusai hyojunka kaihatsu jigyo seika hokokusho. Idenshi kensa system no hyoka hoho no hyojunka (bessatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The separate volume included the proceedings of the re-consignee joint meeting on the standardization of evaluation method of the genetic testing system, the proceedings/data of the meeting of the committee of the standardization of evaluation method of the genetic testing system, etc. The data of the meeting are about a plan to execute the standardization of evaluation method of the genetic testing system, standardization of forms for reporting the results of the genetic test, a trial guideline for standardization of the genetic testing, standardization of evaluation method of the genetic testing system, etc. Moreover, the volume included 11 literature papers overseas on the above-mentioned themes, 'reports on the surveys in Europe and the U.S. on the standardization of evaluation method of the genetic testing system,' etc. (NEDO)

  13. FY 2001 study report on the evaluation/analysis of the data collected in the field test project on the photovoltaic power generation for public facilities, etc.; 2001 nendo kenkyu seika hokokusho. Kokyo shisetsu you taiyoko hatsuden field test jigyo ni okeru shushu data hyoka kaiseki

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    As a field test project on the photovoltaic power generation, collection/analysis/evaluation of the operational data were made about photovoltaic power systems installed at 73 places in FY 2001. As to the analysis of deterioration with age and yearly changes of the system, analysis was made of operation hours of the equivalent system, system output coefficient and inverter performance efficiency in FY 1999, FY 2000 and FY 2001, and it was confirmed that there was few deterioration with age. Relating to the evaluation of reliability of the system, evaluation was made for the record of failures of photovoltaic power systems at 73 places, and the results were not very good as follows: average failure cycle: 1.06 y/system; average failure repair period: 14.9 d/system; rough opportunity loss electric energy: 81,548 kWh/y x 73 sites. Concerning the analysis of economical efficiency, the system cost decreased year by year to 1,102,000 yen/kW in FY 1997, and the power generation cost became 91.8 yen/kWh. The fund recovery year was 35.3 years, assuming the following: unit price of selling electricity: 15 yen/kWh, durable years: 20 years, and public subsidiary rate: 1/2. (NEDO)

  14. Project in fiscal 2000 of developing international standards for supporting new industries. Standardization of method for evaluating characteristics measurement for micromachine materials; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Micro machine yo zairyo no tokusei keisoku hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Targeting the international standardization of the method for evaluating properties measurement for micro-machine materials, R and D has been performed on measurement and evaluation of mechanical properties of different thin film materials with a thickness of about 10 {mu}m or less and a width of 100 {mu}m or less. This paper summarizes the achievements in fiscal 2000. The current fiscal year has executed tensile tests of thin film materials for micro-machines, and surveys on technological trends related to the standardization thereof inside and outside the country. A working process was developed to manufacture test pieces of the thin film materials including mono-crystalline silicon for the purpose of executing the round robin test. Prototype test pieces were fabricated. The round robin test was performed by using these test pieces, wherein improvements were given on the test pieces, structure of the testing machine, the distortion measuring method, and the test piece mounting method. Furthermore, discussions were given on the film forming conditions and the heat treatment conditions with regard to mainly the thin titanium film made by using the sputtering process and thin nickel film made by using the plating process. The IEC/TC47/WG4 committee has announced to propose this evaluation technology as the future international standard. (NEDO)

  15. FY 2000 Study report. Feasibility study on model project for effective utilization of sensible heat of off gas from hot stoves at blast furnaces in India; 2000 nendo Indo ni okeru koro netsufuro hai gas kennetsu yuko riyo model jigyo jisshi kanosei chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The feasibility study was conducted on a model project in India for the energy saving effect and reduction of the greenhouse gas emissions by introducing blast furnace hot stove waste heat recovery systems in steelworks. The blast furnaces studied are Blast Furnace G at Jamshedpur Steelworks of TISCO, the largest private steel maker in India, and No.7 Blast Furnace at Bhilai Steelworks of state-operated Steel Authority of India Ltd. (SAIL). The study results indicate that the annual energy-saving effects of 8,255 and 8,190 tons as heavy oil, and annual CO2 emission reduction of 25,543 and 25,342 tons are expected in the TISCO and SAIL blast furnaces, respectively, in the case of increasing blast temperature and reducing blast furnace fuel coke (increased iron production possible). The model project is applicable to both blast furnaces. There are a total of 46 blast furnaces in India in which the heat recovery systems can be introduced. The nation-wide annual energy saving and CO2 abatement would reach 126,202 tons as heavy oil and 390,501 tons, when all of these blast furnaces could be provided with the heat recovery systems. (NEDO)

  16. Project in fiscal 2000 of developing international standards for supporting new industries. Standardization of communication interface for open robots in production system; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Seisan system nado ni okeru open robot yo tsushin interface no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    In order to realize the open use between robot controllers and personal computers on the communication level, R and D has been performed on the standard API required for structuring the applications to use robot information on the personal computers. A draft of the international standard was prepared. This paper summarizes the achievements in fiscal 2000. The current fiscal year has executed improvements on the standard API software, as well as the demonstration tests. The following achievements were obtained: problems in practical use based on the demonstration tests of RAO ver. 0.5 were extracted and rectified; the standard API (Ver0.9) given additional functions including file transfer was developed; the specifications for the standard API (Ver1.0) were compiled based on the result of discussions on the major application functions; as a result of the demonstration test on reliability of the standard API (Ver0.9), performances were verified when the API is connected under different structural and using conditions; and a resolution was made at the ISO/TC184/SC2 international conference that 'continuation is encouraged on the present R and D expected as a proposal for the new work items'. (NEDO)

  17. Fiscal 2000 regional consortium research and development project - regional new technology creation research and development. Massive rapid identification of gene functions; 2000 nendo chiiki consortium kenkyu kaihatsu jigyo - chiiki shingijutsu soshutsu kenkyu kaihatsu seika hokokusho. Idenshi kino no tairyo jinsoku dotei ni kansuru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Efforts are exerted to develop a system for massive and rapid identification of unknown genes through the utilization of techniques based on the unusual membrane fusion characteristics of HVJ (hemagglutinating virus of Japan), which enables the introduction of genes efficiently and uniformly into cultured cells and living organs (development into a kit). Activities are conducted in the three fields of (1) the development of a method for introducing genes using an HVJ envelop vector, (2) a survey of kit marketing and cold storage facilities in the selling and distribution of the kit, and (3) a comprehensive survey. In the field of (1), studies are conducted for the establishment of methods for HVJ envelop vector production and refining, the establishment of an optimized method for encapsulating genes into the HVJ envelop vector, and the introduction of genes into cultured central neurons using the HVJ envelop vector system. A refining method has been established, which comprises the inoculation of HVJ into eggs, 4-day culture, egg cutting, liquid sampling (chorioallantoic liquid), inactivation (addition of alkylating agent), filtration, enrichment (ultrafiltration), and an anion exchange chromatogram. (NEDO)

  18. FY 1999 project on the development of new industry support type international standards. Standardization of a testing/evaluation method of biological use fine ceramics; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Seitaiyo fine ceramics no shiken hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of standardizing/international standardizing an evaluation method of the characteristics required for biological use fine ceramics, and the FY 1999 results were summed up. In the study of characteristics of biological use fine ceramic materials, it was confirmed that zirconia ceramics are more excellent than alumina ceramics in static strength, repeated loads and fatigue properties in the atmospheric air at room temperature. In the study of the evaluation method of biological affinity, the standardization of the simulated body liquid preparation process was studied, and the simulated body liquid was prepared. To evaluate the bioactivity of biological use fine ceramics without making animal experiments, the simulated body liquid in which the ion concentration was made exactly equal to that of human being was prepared using 2-hydroxyethyl-1-piperazinyl ethane sulfonic acid as buffer. There were seen no changes in ion concentration for four weeks at longest as long as this liquid is kept in airtight container at temperature of 36.5 degrees C or below. The present situation of the standardization of bioceramics was surveyed. (NEDO)

  19. Fiscal 2000 project for development of international standards for supporting novel industries. Standardization for enhanced interoperability between optical disk systems; 2000 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Hikari disk system no sogo un'yosei kakuho no tame no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Research and development was carried out for the enhancement of logical format-based interoperability between optical disk systems for the purpose of presenting propositions for international standards. That is, UDF (universal disk format) defined by OSTA (Optical Storage Technology Association) was taken up against the volume/file structure defined by ISO/IEC13346, and efforts were exerted to substantiate environments for its compatibility test and to develop specifications to achieve such enhanced interoperability. In this fiscal year, specifications were drafted for application program interfaces for the UDF-based file system and UDF security augmentation. These would be presented to IEC (International Electrotechnical Commission) and OSTA, respectively. Their Japanese versions were submitted to the Ministry of Economy, Trade and Industry of Japan, for publication as standard-related information. Maintenance of UAF (universal accessible file) system-compliance test tools were accomplished in response to user requirements and to the updating of UDF-compliance test disk specification. (NEDO)

  20. Achievement report for fiscal 1998 (edition B) on auxiliary New Sunshine Project. Development of coal hydrogasification technology (Research by using experimental device); 1998 nendo New Sunshine keikaku hojo jigyo seika hokokusho (B ban). Sekitan suiso tenka gaska gijutsu kaihatsu - Jikken sochi ni yoru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    With an objective of using practically the coal hydrogasification technology (the ARCH process), developmental research has been performed on important elementary technologies using different experimental devices. This paper summarizes the achievements in fiscal 1998. In the research by using a small testing apparatus, the Taiheiyo coal was used to have derived hydrogasification data (distribution and yield of the reaction products) in case of having changed the reaction pressure, temperature rising rate, and H{sub 2}/caoal ratio, and to verify the possibility of increasing the BTX yield by installing a temperature zone in two steps. In the developmental research on the injector, a combustion test and a coal feeding test were performed on the injector having been designed and fabricated in the previous fiscal year to verify the basic performance and evaluate the heat resistance and durability. With respect to the hot model test, a test installation was completed with the injector mounted to conduct the trial operation and test. In addition, development was conducted on the coal temperature rise simulation as the second phase of developing the simulation of mixing of coal with high-temperature hydrogen and temperature rise. (NEDO)

  1. Fiscal 1999 achievement report. Venture seed pickup type international cooperative research project (Development of ultrahigh-speed terabyte optical disk storage device); 1999 nendo venture seeds hakkutsugata kokusai kyodo kenkyu jigyo seika hokokusho - venture seeds No.7. Chokosoku terabyte hikari disk kioku sochi no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Efforts are made to submit a concrete, industrialization-capable proposition for a huge-volume high-rate data storage device to be connected directly to the optical fiber communication network. The terabyte optical disk storage device is based on the patented technologies owned by some organizations participating in the project, and embodies a 1-terabyte memory and a 1-Gbps data transfer rate in a CD-size disk with CD/DVD compatibility not affected. The road to a novel, huge-volume, ultrahigh-speed data storage device was open when the basic principle of collinear-polarization digital volume holography was successfully confirmed. A new optical disk medium was fabricated for recording digital volume holograms, and a success was attained in retrieving records on a terabyte optical disk evaluation system. A novel spatial light modulator was successfully fabricated using the magnetooptic effect. This will enable improvement on transfer rates in digital volume hologram retrieval devices and introduction of such devices into optical communication in the field of information technology. (NEDO)

  2. Fiscal 2000 achievement report on the venture business assisting type regional consortium - Minor business creation base type. Development of touch panel display operated by micro-Peltier device; 2000 nendo chiiki consortium kenkyu kaihatsu jigyo seika hokokusho. Micro Peltier soshi ni yoru shokkaku display no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The project aims to develop a small, light, and inexpensive touch panel display that enables visually handicapped people to transmit information by use of their manual sensation. Information from computers or the like is exhibited on the display in arrays of hillocks and dents. For improvement on display resolution and for cost reduction, efforts are made (1) to employ micro-Peltier devices for the simplification of the hillock-dent display mechanism and for the realization of a high resolution tactile display and (2) to establish a technology for manufacturing low-cost micro-Peltier devices. In the tactile display to be developed, the hillocks and dents are formed using gas-filled tiny balloons. The balloons are 2-dimensionally arranged, with the gas therein to be expanded and contracted via micro-Peltier devices. Difference between hillock-dent arrays and changes therein with the passage of time provide information. The gas in the balloons is inflated and contracted through the operation of micro-Peltier devices. In concrete terms, efforts were made to develop (1) a prototype hillock-dent display, (2) a technology for manufacturing high-performance low-cost micro-Peltier devices, and (3) a software program for computers to drive tactile displays. (NEDO)

  3. FY 1999 Report on the technical results. Research and development project for creation of the quick-effect type international standards (Standardization in the field of safety of machinery); 1999 nendo sokkogata kokusai hyojun sosei kenkyu kaihatsu jigyo seika hokokusho. Kikai anzensei ni kakawaru hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    It is necessary to standardize the concepts and terminology of safety, design principles, protection and technology for evaluation of safety over a wide range including designs and specifications, in order to secure safety of the users. The international standardization has been promoted, based on the European voluntary standards EN. It is necessary for Japan to propose the international standards reflecting the industrial environments of Japan, in order to keep and expand her international competitiveness. Those technologies developed for the above purposes include the safety-related ones based on the Japanese electronic technologies, electronized operation-controlling technologies with dynamic fail safe signal processing, DC power supply circuit with a failure-sensing circuit, opto-ultrasonic hybrid type personal sensing device and pressure-sensitive mat sensor, emergency stop devices having no electrical contact to eliminate the contact fusing risk, and video camera system which facilitates emergency stop action of machinery. These results are submitted to the related technical committees of ISO or IEC. A total of 46 items of the international standard proposal drafts related to IEC/TC44 are also submitted. (NEDO)

  4. FY 1999 project on the development of new industry support type international standards. Standardization for high-interoperability of optical disk systems; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Hikari disk system no sogo un'yosei kakuho no tame no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The R and D were conducted on the standardization for interoperability of optical disk system, and the FY 1999 results were summarized. In the study, for the volume/file structure specified by ISO/IEC 13346, the development of standards was made for interoperation of the UDF specified by OSTA. In this fiscal year, to avoid the problem on non-interchangeability of UDF which actually exists, enhancement of functions of a test tool for UDF interchangeability was tried. Namely, development was carried out of UDF interchangeability test tool, UAF related standards, and UAF related standards assessment system. Especially, it was formally announced that UDF security enhancement of UAF related standards will be included in UDF2.x in the OSTA conference held at the end of FY 1999. Also, a draft on the standard information was drawn up domestically. The standards including API are expected to be established as standards through activities in the next fiscal year. (NEDO)

  5. Fiscal 2000 achievement report on project for research and development of intelligent infrastructure creation and utilization technologies. Research and development of reference materials for polymers; 2000 nendo chiteki kiban sose riyo gijutsu kenkyu kaihatsu jigyo seika hokokusho. Kobunshi ni kansuru hyojun busshitsu no kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    As one of the efforts to establish national reference materials at an accelerated pace in a concentrated manner, a comprehensive survey was conducted on reference materials for polymers, and research and research was conducted for the development of such. In the comprehensive survey, investigations were made into the actual use of reference materials for polymers and their management at private-sector enterprises and public research institutes in Japan and at research bodies in the U.S. and Canada. In the development of reference materials for polymers, a procedure was contrived for synthesizing monodisperse oligostyrene specimens, polymerization was carried out using an improved synthetic method, and molecular weight distribution was analyzed. Using a homogeneous oligostyrene reference material for calibration, the mean molecular weight of an oligostyrene reference material was accurately evaluated by size-excluded chromatography. In the case of a specimen with its mean molecular weight not more than 1,000, the result exhibited excellent agreement with what supercritical fluid chromatography indicated. In the development of reference materials for characteristics evaluation, this in relation to methods for evaluating thermomechanical characteristics of plastics, efforts were made to develop reference materials for evaluating dynamic viscosity/elasticity of solid plastics. (NEDO)

  6. Fiscal 1999 technical research report. Research and development project on prompt-effect international standards creation (Standardization of gene amplification and analysis methods for genetic screening); 1999 nendo shinki sangyo ikusei sokkogata kokusai hyojunka kaihatsu jigyo seika hokokusho. Idenshi kensayo idenshi zofuku kaiseki hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the promotion of Japan's proposition for international standardization, PCR (polymerase chain reaction) Comprehensive Research Committee, Technical Promotion Committee, and Japan Bioindustry Association organized a 5-member overseas research team and dispatched the team to Europe and America where they held research interviews at government organizations and business corporations engaged in standardization promotion. The aims were to disclose trends of PCR method standardization and standardization in general in biotechnology. The team visited British Standards Institution, Association Francaise de Normalisation, German Institute for Standardization, Food and Drug Administration of America, American Society for Testing and Materials, PE Biosystem, Bio-Rad Laboratories, and Roche Molecular Systems. The objects of standardization at issue included techniques, tools, devices, and reagents to be used. It is found that in Europe and America there are standardization plans under deliberation for PCR-aided techniques, not for PCR itself, and that some are now approaching completion as national or local standards. It is also learned that in every standardizing organization there is a person responsible for each TC (technical committee) of CEN (Committee European pour Normalisation). (NEDO)

  7. FY 1999 project on the development of new industry support type international standards. Standards development of chemical analysis and non-destructive inspection methods for pure titanium metals; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Junchitan no shiken hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    To propose it to ISOTC79 and ISOTC135, study was conducted for standardization of chemical analysis method and non-destructive inspection method for industrial use pure titanium. As the chemical analysis method, the inductively coupled plasma atomic emission spectrometry which has good detection limit was developed, and at the same time, the standardization of spark and/or glow discharged atomic emission spectrometry was developed. As the non-destructive inspection method, developmental study on the following was carried out: surface defect inspection method of pure titanium metals by laser scanning inspection system or CCD camera; internal defect inspection of pure titanium sheet and coil by plate wave ultrasonic inspection method; internal defect inspection of pure titanium bar by eddy current method; inspection of very small leakage of pressurized fluid through defects in pure titanium pipe and tube by pressure differential testing method. As a result of the study, standards of system performance and tolerance were determined in analysis of Pd, Si, Al, Cu, Mo, Zr, Nb, Ta and Y. Further, analytical conditions and application ranges of the spark discharged atomic emission spectrometry were made definite in terms of 19 elements including Mn, Fe, Ni, Cr, Sn, Pb, Si, Al, V, Cu, Mo, Zr, Nb, Ta, Co, B, Y, C and W. (NEDO)

  8. Research report for fiscal 1998 on the basic research for energy consumption efficiency improvement in developing countries. Joint research for oil consumption efficiency improvement. Indonesia; 1998 nendo hatten tojokoku energy shohi koritsuka kiso chosa nado jigyo sekiyu shohi koritsuka kyoryoku chosa jigyochosa hokokusho. Indonesia

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    On-site researches are conducted to study the possibility of a model business using energy-saving and environment preservation technologies of Japan and Indonesia. At textile plants, the management of heat and water in the dyeing and finishing processes is found inadequate, with great quantities of heat left uncared-for in medium- and low-temperature wastewater. An energy-saving proposition is submitted in which solar energy and absorption-type refrigerators are combined. Instrumentation and management also require improvement. At nitrogenous and phosphatic fertilizer plants, the energy consumption rate is found aggravated by degradation of facilities, and continued research and further analysis are necessary before working out energy-saving policies for them. At urea fertilizer plants, though it is not easy to modernize the manufacturing processes, energy-saving and environment preserving efforts are under way within the bounds of capability. Their energy consumption rate is high because of frequent shut-downs. It is necessary to detect an anomaly at its early stage and to introduce backup systems for the elimination of erroneous operations. Operating conditions need to be analyzed for validity. At melamine manufacturing plants, process drainage is allowed into the river without any treatment contaminating the water with products of melamine hydrolysis. Short-term and long-term solutions are suggested. (NEDO)

  9. Fiscal 2000 achievement report on the venture business assisting type regional consortium - Minor business creation base type. Commercialization of human monoclonal antibody as investigational reagent; 2000 nendo chiiki consortium kenkyu kaihatsu jigyo seika hokokusho. Hitogata monoclonal kotai no kenkyuyo shiyaku to shite no seihinka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Technical seeds of in vitro immunization technologies for human peripheral lymphocytes and technologies for human cell fusion, both developed by Kita-Kyushu National College of Technology, are used, and human monoclonal antibodies are prepared easy to connect to tumor markers, allergens, and microbes. The project aims further to develop a technology for small-scale high-density production of such antibodies and to supply them as human monoclonal antibody reagents meeting the needs of bio-researchers in the fields of medicine, pharmacy, biology, agriculture, or the like. A human fusion partner cell strain SK-729-1 clone is obtained, which is high in ability to produce antibodies. Since the obtained cell is culturable in a serumless medium, a fusion cell strain prepared using the said cell strain is also culturable in a serumless medium. Hence: advanced refining now available for human monoclonal antibodies. Nine types of antibodies are acquired. Furthermore, it is made possible to predict the antibody reaction and the antibody amount in a simplified way. Containers for antibody preservation are screened, and a container is selected in a freezing/thawing test, capable of preserving 90% or more of antibodies. A high-density culture that uses the hollow fiber cartridge is now feasible. (NEDO)

  10. FY 1999 project on the development of new industry support type international standards. Standardization of a measuring method of fuel consumption of hybrid electric vehicles; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Hybrid denki jidosha no nenpi sokutei hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of proposing a measuring method of fuel consumption of hybrid electric vehicle (HEV) to ISO and internationally standardizing it, test/study were made. The FY 1999 results were summarized. In this fiscal year, the following were conducted using one new vehicle in addition to the two HEVs used in the previous fiscal year: assessment of generative energy at braking, and verification of the results obtained in FY 1998 such as changes in the remaining battery capacity before/after the test. Further, study was made on 'the concretely described contents of each element of the standards' and 'the method to correct changes in battery capacity and improvement in measuring accuracy.' Moreover, the items to be considered at the time of measuring current were made clear. Based on these studies, the making of a draft on the standards was finished. In addition, the measurement by overseas mode was also made, and it was confirmed that this is an effective measuring method also for overseas mode. In the investigational study, standards/papers overseas were surveyed. Exchanges of opinion on the technical background, etc. were also made with persons who are making the same studies overseas for mutual understanding. (NEDO)

  11. Research report of FY 1997 on the environmentally acceptable coal utilization system feasibility survey. Clean coal technology model project seminar held in Thailand; 1997 nendo seika hokokusho. Kankyo chowagata sekitan riyo system kanosei chosa (Tai ni okeru clean coal technology model jigyo seminar no kaisai)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    To reduce SOx with coal utilization, the desulfurization seminar diffusing the demonstration project of simplified desulfurizer introduction was held at the site in Thailand. The purpose is to reduce the environmental pollutants and contribute to the effective utilization of energy with coal utilization in Thailand. Invitation letters were sent to users of coal and heavy oil boilers through the Department of Factories, Ministry of Industry, Thailand, to call participation in the seminar. Inspection of the desulfurizer introduced in the factory of Thai Union Paper Public was included in the seminar for diffusing the project. The inspection site is in the demonstration project site of simplified desulfurizer introduction. There were a lot of participants from Thai users and from Japan. The seminar included the presentations from NEDO, JETRO, FTI, and MOSTE, introduction of general technology for processes of ENAA desulfurizer, introduction of demonstration unit plan by IHI, and introduction of operation of demonstration unit by TUP. 31 figs., 6 tabs.

  12. FY 1999 project on the development of new industry support type international standards. Standardization for high-interoperability of optical disk systems; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Hikari disk system no sogo un'yosei kakuho no tame no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The R and D were conducted on the standardization for interoperability of optical disk system, and the FY 1999 results were summarized. In the study, for the volume/file structure specified by ISO/IEC 13346, the development of standards was made for interoperation of the UDF specified by OSTA. In this fiscal year, to avoid the problem on non-interchangeability of UDF which actually exists, enhancement of functions of a test tool for UDF interchangeability was tried. Namely, development was carried out of UDF interchangeability test tool, UAF related standards, and UAF related standards assessment system. Especially, it was formally announced that UDF security enhancement of UAF related standards will be included in UDF2.x in the OSTA conference held at the end of FY 1999. Also, a draft on the standard information was drawn up domestically. The standards including API are expected to be established as standards through activities in the next fiscal year. (NEDO)

  13. FY 1999 project on the development of new industry support type international standards. Standardization for securing mutual connection among informative household electric appliances; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Joho kaden kikikan no sogo setsuzokusei kakuho no tame no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The R and D were conducted with the aim of the international standardization for securing mutual connection among informative household electric appliances, and the FY 1999 results were summarized. In FY 1999, the following were conducted: trial manufacture (for mass production) and evaluation of wide band POF (plastic optical fiber), trial manufacture and evaluation of home use small connector, and trial manufacture and evaluation of optical transceiver module. Various data required for the targeted standardization (transmission band: S400 or more, transmission distance: 100m) were obtained. In the next fiscal year, tests to demonstrate validity/reliability of the data are conducted so that the standards to be accepted as an international standard can be established. In the study of strategies of international standardization, the contents of the standards proposed were discussed, and activities of IEC/TC100 (multi-media) and the related TC were investigated. Early in the next fiscal year, the TC to be proposed is fixed, and international proposing activities are started such as the introduction of the standardization for this R and D to the organizations and persons concerned overseas. (NEDO)

  14. Fiscal 1999 technical achievement report. Research and development project on the quickly effective international standards creation (Standardization of safety of light emitting diode or the like); 1999 nendo sokkogata kokusai hyojun sosei kenkyu kaihatsu jigyo seika hokokusho. Hakko diode nado no anzensei ni kansuru hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Since radiation of a laser diode (LD) is quite different from that of a light emitting diode (LED), evaluating their safety under one and the same standard (criterion) is questionable. The International Electrotechnical Commission (IEC), however, treats them in the same way. For the remedy of such contradiction and for the clarification of difference between the two devices in terms of radiation characteristics, they were quantitatively measured for spatial coherence and further measured for coherence dependency of their beam diameters. Well-supported threshold levels were prepared and biological tests were conducted for proposing a revision of the LED safety standard (IEC). As for the safety of equipment with built-in infrared devices, a measurement method was prepared as IEC61913 and devices are already at the CVD (chemical vapor deposition) stage. The result will be placed before the IEC/TC76 committee for deliberation of IEC60825-1 revision. Furthermore, to establish alignment between IEC and ISO (International Standardization Organization) in terms of laser-aided measurement which is the foundation for such committee deliberation, an ISO/IEC international joint group was created, and a technical recommendation was compiled and presented to the two standardizing organizations. (NEDO)

  15. FY 1999 project on the development of new industry support type international standards. Standardization of digital image processing in household digital electronic devices; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Kateiyo digital denshi kiki ni okeru digital gazo shori no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    As a framework of the processing of intellectual properties concerning the mobile videophone use coding system, MPEG-4, the paper took up the Intellectual Property Management and Protection (IPMP) framework, discussed a proposal for the standardization aiming at expanding IPMP functions, and summed up the FY 1999 results. In the activities of MPEG-4PF project in this fiscal year, four of the tools from Japan were extracted as candidates of the powerful tool which belongs to 'Simple and Core' of MPEG-4Visual and profile of MPEG-4Audio, and the international standardization was promoted. Especially, attention was paid to the mobile, promotion was made as a tool effective for heightening error resistance, and all the proposals were adopted. Further, attention was paid to the security field, and a proposal was made for IPMP expansion. The expansion makes up defects of the IPMP system which had already been proposed as a candidate for standardization. For the intensive discussion for this, a special work team was set up, and a special meeting was held at Tokyo University. (NEDO)

  16. Fiscal 1999 technical research report. Research and development project on prompt-effect international standards creation (Standardization of gene amplification and analysis methods for genetic screening); 1999 nendo shinki sangyo ikusei sokkogata kokusai hyojunka kaihatsu jigyo seika hokokusho. Idenshi kensayo idenshi zofuku kaiseki hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the promotion of Japan's proposition for international standardization, PCR (polymerase chain reaction) Comprehensive Research Committee, Technical Promotion Committee, and Japan Bioindustry Association organized a 5-member overseas research team and dispatched the team to Europe and America where they held research interviews at government organizations and business corporations engaged in standardization promotion. The aims were to disclose trends of PCR method standardization and standardization in general in biotechnology. The team visited British Standards Institution, Association Francaise de Normalisation, German Institute for Standardization, Food and Drug Administration of America, American Society for Testing and Materials, PE Biosystem, Bio-Rad Laboratories, and Roche Molecular Systems. The objects of standardization at issue included techniques, tools, devices, and reagents to be used. It is found that in Europe and America there are standardization plans under deliberation for PCR-aided techniques, not for PCR itself, and that some are now approaching completion as national or local standards. It is also learned that in every standardizing organization there is a person responsible for each TC (technical committee) of CEN (Committee European pour Normalisation). (NEDO)

  17. Fiscal 2000 report of research on the analysis and evaluation on data collected in project of field test of photovoltaic power generation for public and other facilities; 2000 nendo kokyo shisetsunadoyo taiyoko hatsuden field test jigyo ni okeru shushu data hyoka kaiseki kenkyu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of promoting photovoltaic power generation, analysis and evaluation were conducted on the data of the project of the field test in public facilities for example. This paper describes the fiscal 2000 results. The equivalent array operation time was 2.98 h/day and, by multiplying it by the output of the standard test condition, a generated output was obtained. The system generating efficiency was 0.102 while the inverter energy efficiency was 0.917 on the average. The average array performance ratio was 0.778 and the system performance ratio was 0.714. The analysis on cost effectiveness of the installed systems has an important bearing upon the future introduction, promotion and development. The power generating cost (the annual cost was calculated as the sum of the capital cost, the direct cost, and the administrative expenses) decreased as the installation year progressed, with the average at the sites installed in fiscal 1997 at 93 yen/kWh. The system cost (calculated by dividing the construction cost by the array capacity) also decreased as the installation year became more recent. The annual maintenance cost showed a wide range from 500 yen to 30,000 yen/kW. Answers from the sites that the systems were running smoothly were 38 to 45%, while those that trouble occurrence was frequent were 2.4% on the generating systems and 12.9% on the measuring systems. (NEDO)

  18. Achievement report for fiscal 1997 (edition B) on auxiliary New Sunshine Project. Development of coal hydrogasification technology (Research by using experimental device); 1997 nendo New Sunshine keikaku hojo jigyo seika hokokusho (B ban). Sekitan suiso tenka gaska gijutsu kaihatsu - Jikken sochi ni yoru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    With an objective of using practically the coal hydrogasification technology (the ARCH process), developmental research has been performed. This paper summarizes the achievements in fiscal 1997. In the research by using a small testing device, the Taiheiyo coal was used to have derived hydrogasification data (distribution and yield of the reaction products) in case of having changed the temperature, residential time and H{sub 2}/caoal ratio at a pressure of 7.0 MPa. In the developmental research on the injector, a test to verify mixing performance was performed by simulating the coal/hydrogen with gas/gas and coal/gas at normal temperature and pressure. Furthermore, discussions were given on the heat conduction analysis and cooling structure, whereas an injector was designed and fabricated. With respect to the hot model test to verify the performance of the injector, detailed design and partial fabrication of the test device were carried out. In addition, development was conducted on the coal/gas system mixing simulation to simulate the states of dispersion and mixing of the coal as the first phase of developing the mixing and temperature rise simulation. (NEDO)

  19. FY 1999 project on the development of new industry support type international standards. Standardization of test/evaluation methods of telecommunication use fine ceramics; 1999 nendo shinki sangyo shiengata kokusai hyojun kaihatsu jigyo seika hokokusho. Tsushin kikiyo fine ceramics no shiken hyoka hoho no hyojunka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    As to high frequency/ultra-high frequency band use fine ceramics, the R and D were conducted with the aim of establishing the evaluation method of electric characteristics such as dielectric constants and dielectric losses, and at standardizing and internationally standardizing the principle of the measuring method, preparation method of equipment and test pieces, measuring procedures, etc. The FY 1999 results were summed up. As to the measuring method of electric characteristics, enhancement of measuring accuracy was made for the millimeter wave coaxial exciting cavity resonator method and the Fabry Perot method. Further, field survey was made of the developmental trend of the measuring method in Europe and the U.S. Concerning measuring use standard test pieces, candidate materials were trially manufactured, and the shape/dimension of a part of the candidate materials were determined. As to surface basic properties, effects of surface shape and convex/concave faces of test pieces on characteristic evaluation were studied, and it was made clear that convex/concave faces were greatly influential. In the technical committee, how to proceed with the development was discussed in the first meeting, and evaluation methods and candidate standard substances were selected in the second meeting. (NEDO)

  20. FY 2000 Immediate-effect type project for research and development for international standards supporting information technology industries. Comprehensive study on promotion of international standardization; 2000 nendo joho sangyo shien sokkogata kokusai hyojun kaihatsu jigyo seika hokokusho. Kokusai hyojunka suishin ni kakawaru sogo chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The information technology and international standardization are studied for the elementary information technology, mechanical safety areas and electronic trading, aimed at achieving the international standards in a short time for the information industrial sector, which shows rapid technological development. The program for the elementary information technology includes development/standardization of the testing/evaluation methods for transparent electroconductive films for notebook computers, liquid crystal monitors or the like, specifically for the mechanical and physical properties. The program for mechanical safety areas includes definition of the closed space type mechanical safety monitoring techniques and use of safety-confirmation type sensors for the techniques, and standardization of the requirements of the protectors for use of the safety-confirmation type sensors, among others. The program for the electronic trading includes standardization of the electronic catalogues of the instrumentation devices, dictionaries of the instrumentation devices and device-screening processes. The other efforts include development of the applications and system infrastructure functions, construction of the demonstration test systems, and demonstration tests. (NEDO)