  1. Small hydro

    International Nuclear Information System (INIS)

    Bennett, K.; Tung, T.

    1995-01-01

    A small hydro plant in Canada is defined as any project between 1 MW and 15 MW but the international standard is 10 MW. The global market for small hydro development was considered good. There are some 1000 to 2000 MW of generating capacity being added each year. In Canada, growth potential is considered small, primarily in remote areas, but significant growth is anticipated in Eastern Europe, Africa and Asia. Canada with its expertise in engineering, manufacturing and development is considered to have a good chance to take advantage of these growing markets

  2. Small steps for hydro

    International Nuclear Information System (INIS)

    Wicke, Peter

    1998-01-01

    The government in Peru has decided to utilise its gas reserves and restrict hydro to relatively small schemes. A number of reasons for the decision are given. In 1997, the Shell-Mobile-Bechtel-COSAPI consortium was formed and agreements were signed regarding exploiting Gas de Camisea. The country's energy needs to 2010 are being assessed. It is likely that by 2001 the whole of south Peru will be receiving gas from Camisea. The Peru situation is discussed under the headings of (i) existing capacity, (ii) growing demands, (iii) a history of hydro in Peru, (iv) electrification and SHP and (v) outlook. The future for Peru's electric energy development is bright. While most of its new power capacity will come from natural gas, the small hydros also have a part to play. A stronger commitment of national and regional political authorities to consider supplies outside the big cities is said to be needed. (UK)

  3. Small hydro in Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2011-10-01

    Full Text Available hydro, the author has started an online database of small hydropower projects in eastern and southern Africa. The main aim of the database is to catalogue the current situation and to make that accessible to policymakers, project developers, as well...

  4. Vaksvikelva small hydro

    OpenAIRE

    Loe, Daniel Aarset

    2017-01-01

    Norway is in constant need of renewable energy, and hydroelectric power is still the main source. A great future potential can be found in countless small rivers scattered across the country, which could be developed through small hydro projects. In the process of converting mechanical movement - flowing water - into electric energy, about 5% turns into heat. From a power plant with an annual production of 15 GWh, this means energy enough to heat approximately 30 households is lost. In my pro...

  5. The Nothuesli small hydro project

    International Nuclear Information System (INIS)

    Balachandran, S.; Jorde, K.

    2008-01-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  6. Good prospects for Portuguese small hydro industry

    International Nuclear Information System (INIS)

    Betamio de Almeida, A.; Serranho, H.

    2000-01-01

    The article outlines the history of hydro in Portugal and discusses the current position of small-scale hydro with particular reference to the Portuguese Small Hydro Association (AMPH). Encouraged by legislation, and the Valoren community programme (which defined investment incentives), many new small hydro projects sprang up in Portugal in the 1990s. In some areas of Portugal the water levels were higher than the urban centres where the water is required: how the problems of integrating power and water were addressed is described. The integration of power and irrigation schemes is also mentioned. In the wake of great expansion in the Portuguese hydro industry, there was a sharp reduction (in 1995-6) and the reasons for that are listed. The 1999 tariff was such that it is likely that small hydro will provide 3.8% of the electric power consumed nationally by 2010

  7. New markets for small-scale hydro

    International Nuclear Information System (INIS)

    Maurer, E.A.

    1997-01-01

    The market for small and medium sized hydro-electric power plant is more attractive than ever. The boom in Europe has increasingly spread to the emerging countries, and here too small hydro plays an important ecological role. In addition to new plant rehabilitation of 'historical' plant is now a major factor. The last few years have seen a market shift from single machine components to complete plant and systems, requiring a strategy re-think on the part of larger companies. Following the influx of private capital into the power industry, business conditions have also undergone a thorough transformation. In place of 'fast money', hydro power offers the prospect of earning longer-term, sustainable money'. The term small-scale hydro-electric power (or simply 'small hydro') is used slightly differently depending on the country and market. Here, it is used to denote plant with turbines up to 10 MW. (Author)

  8. Small hydro: Policy and potential in Spain

    International Nuclear Information System (INIS)

    Gutierrez, C.

    2001-01-01

    In Spain, the benefits of small-scale (less than 10 MW) hydro are apparently rarely appreciated and there is little support from European institutions. The article suggests that small hydro technology can make a significant contribution to the country's energy requirements and create employment, provided certain obstacles can be removed. Data on the number of small hydros in Spain, and of recent installations are given; the share of hydro in Spain's total energy production is 2.5%. The low environmental impact of hydro is extolled, and the conclusions of a recent study of 'environmental impacts of the production of electricity' are listed. There are said to be unreasonable administrative obstacles; for example, it is more difficult to obtain permission to refurbish a 100 kW hydro plant in Castilla y Leon than it is to install a 30,000 kW gas plant. Some details relating to the affect of hydro on aquatic ecosystems, noise levels, and water quality, are given

  9. Optimising India's small hydro resources

    International Nuclear Information System (INIS)

    Kumar, A.

    1995-01-01

    A brief history is given of an initiation to develop small scale hydropower projects in the Himalayas. The experience of the Indian project managers in utilising international funds from the Global Environment Facility could serve as a model for other small remote communities in the rest of the world. Lessons learned are reported. (UK)

  10. Small hydro generation building block profile

    International Nuclear Information System (INIS)

    2003-01-01

    Concise business information on small hydro generation in British Columbia was presented in this document. It was noted that the steep terrain within the province and its abundant precipitation provides numerous opportunities for hydropower generation in British Columbia. The hydroelectric sector produces approximately 90 per cent of the electrical demand in the province. The document focusses on small hydro sites producing between 0.5 and 50 mega watts (MW) and not having large water storage. In the first section, an overview of the electricity sector in the province is provided. The following issues are examined in subsequent sections: land resources; infrastructure requirements; sales market; labour market; the regulatory regime; development factors; non-governmental aspects; investments and economics; the present status and future outlook of the industry; and, government revenue. Input-output tables were also provided. 22 refs., 5 tabs., 4 figs

  11. Financing options for small hydro projects

    International Nuclear Information System (INIS)

    Shepherd, J.C.

    1993-01-01

    Examples and techniques used to enhance the ability to finance small hydro projects, or to finance them in non-standard ways, were discussed. It was suggested that factors that motivate investors, namely the maximization of the rate of return on capital, and minimization of risk, should be the primary concern for any would-be developer. A responsible, conservative approach to financial projections was recommended as the best to impress potential investors

  12. A comparison of the aquatic impacts of large hydro and small hydro projects

    Science.gov (United States)

    Taylor, Lara A.

    The expansion of small hydro development in British Columbia has raised concerns surrounding the effects of these projects, and the provincial government's decision to proceed with Site C has brought attention to the impacts of large hydro. Together, these decisions highlight that there are impacts associated with all energy development. My study examines the aquatic effects of large and small hydro projects using two case study sites: Site C and the Upper Harrison Water Power Project. I first determine the aquatic effects of each of the case study sites. Next, I use existing literature and benefits transfer to determine the monetary value of these effects. My results suggest that, with mitigation, small hydro projects have less of an effect on the environment than a large hydro project per unit of electricity. I also describe the implications of my study in the context of current British Columbia energy policy. Keywords: hydropower; aquatic effects. Subject Terms: environmental impact assessment; benefits transfer.

  13. An overview on small hydro in Brazil

    International Nuclear Information System (INIS)

    Filho, G.T.

    2008-01-01

    An overview of small-scale hydro development in Brazil was presented in the context of the Brazilian energy sector. Brazil's energy sector is currently comprised of 45 per cent renewable energy. Brazil is the tenth largest energy producer in the world, with an installed capacity of 105.986 MW. Brazil currently has an estimated 258.410 MW of hydroelectric power potential. Small hydropower (SHP) plants in Brazil are defined as plants capable of producing up to 30 MW of power, with a reservoir area smaller than 12 km 2 . It is estimated that SHP plants will provide 5 per cent of Brazil's electrical supply by 2030. SHP plants in Brazil typically use Kaplan and Pelton hydraulic turbines, as well as Michell-Banki cross-flow turbines. Hydrokinetic turbine prototypes are also being designed at the Federal University of Brazil. Researchers are currently developing a diffuser enhancement design. However, there are currently no designs available that use peripheric generators. Researchers are currently investigating the design of fish-friendly turbines as well as mobile dams. Development projects in the Amazon region were outlined. tabs., figs.

  14. An overview on small hydro in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Filho, G.T. [Federal Univ. of Itajuba (Brazil). National Reference Centre for Small Hydro

    2008-07-01

    An overview of small-scale hydro development in Brazil was presented in the context of the Brazilian energy sector. Brazil's energy sector is currently comprised of 45 per cent renewable energy. Brazil is the tenth largest energy producer in the world, with an installed capacity of 105.986 MW. Brazil currently has an estimated 258.410 MW of hydroelectric power potential. Small hydropower (SHP) plants in Brazil are defined as plants capable of producing up to 30 MW of power, with a reservoir area smaller than 12 km{sup 2}. It is estimated that SHP plants will provide 5 per cent of Brazil's electrical supply by 2030. SHP plants in Brazil typically use Kaplan and Pelton hydraulic turbines, as well as Michell-Banki cross-flow turbines. Hydrokinetic turbine prototypes are also being designed at the Federal University of Brazil. Researchers are currently developing a diffuser enhancement design. However, there are currently no designs available that use peripheric generators. Researchers are currently investigating the design of fish-friendly turbines as well as mobile dams. Development projects in the Amazon region were outlined. tabs., figs.

  15. Small hydro plant- present scenario and future prospects

    International Nuclear Information System (INIS)

    Purohit, D.P.

    1996-01-01

    The article, deals with the methodology of power generation by small hydro power resources, especially in the Himalayan and sub Himalayan regions and the benefits it will bestow to the inhabitants of this region. The development of small hydro power projects in the Himalayas and sub Himalayas would serve as a model for environment- friendly sources of energy to benefit small communities world wide. The use of water turbine generators for the generation of cheaper power is also discussed. 4 refs

  16. Fouling in small hydro projects; Verschmutzung von Kleinwasserkraftwerken - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Abgottspon, A.; Staubli, T.

    2010-03-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) takes a look at fouling problems encountered in small hydro installations. The report is based on ten interviews made with operators of small hydro power stations in Switzerland. A parallel project carried out in Germany is mentioned. A large variation in the degree of fouling in the various hydro power stations is noted. Sources such as leaves in autumn and algae are discussed, as are the various rinsing procedures used to clear the turbines of fouling. Power losses are discussed and measures that can be taken to prevent fouling are described. Measurements made at an installation in Freienstein, Switzerland, are presented and discussed. The report is completed with an appendix containing calculations, details on the Freienstein power plant and the results of interviews made with the ten hydro power installations examined.

  17. Small hydro takes stock of a dozen years of activity

    International Nuclear Information System (INIS)

    Leutwiler, H.

    2000-01-01

    This short article discusses a survey that takes stock of the investments made in small hydro schemes in Switzerland since 1985 and the structural changes in this area that have occurred. Typical figures are given for investments and the increase in energy production that have resulted. The various possibilities for the realisation of small hydro installations are discussed including pressure-reduction turbines, the use of turbines in drinking water and wastewater systems. The importance of the sale of the electricity thus generated as 'green' power is noted. The potential of this form of electricity generation in a liberalised electricity market and the obstacles placed in its way are discuss

  18. Commercialisation of small hydro through community participation

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, R.

    1999-07-01

    This report gives details of a project aimed at deriving models for the development of a community owned and managed small hydroelectric power plant in Wales for testing financial and legal structures, and assessing models for the sale of electricity. The formation of the community group, technical assessment of the project, the scoping for environmental effects, and legal and financial options for community renewable energy projects are discussed. Electricity trading options are considered, and the project economics and financing are analysed. (UK)

  19. Commercialisation of small hydro through community participation

    International Nuclear Information System (INIS)

    Stevenson, R.

    1999-01-01

    This report gives details of a project aimed at deriving models for the development of a community owned and managed small hydroelectric power plant in Wales for testing financial and legal structures, and assessing models for the sale of electricity. The formation of the community group, technical assessment of the project, the scoping for environmental effects, and legal and financial options for community renewable energy projects are discussed. Electricity trading options are considered, and the project economics and financing are analysed. (UK)

  20. The Hetex small-scale hydro plant

    International Nuclear Information System (INIS)

    Guentert, P.; Boller, F.; Wanner, A.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at the 400 kW small hydroelectric power plant (SHP) installed on the Aabach stream in Niederlenz, Switzerland. With a maximum water-flow of 4.5 m 3 /s, the turbine can produce about 1.5 GWh of electricity per year. In spring 2005, bearing damage necessitated substantial renovation to the turbine and the generator. This study examines the state of the rest of the plant noted during maintenance work. It also focuses on the feeding of the electricity produced into the grid, the effects of increased residual water-flow, the option of using the Hallwilersee lake as a buffer, upstream flood evacuation and the possibility of green electricity certification. The calculation of the amount of water available is discussed. Due to inconsistent data, a corrected flow-duration curve was used. For the local river authorities, the through passage for fish from the Aare river up to the Hallwilersee has a high priority. The Hetex SHP weir is one of nine barriers to a direct connection. The planning of a fish-pass to be built in 2006 is discussed

  1. The Nothuesli small hydro project; Wasserkraftwerk Nothuesli, Gonzenbaechli - Vorprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Balachandran, S.; Jorde, K.

    2008-07-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  2. Small hydro in Ukraine: To invest or not to invest?

    Energy Technology Data Exchange (ETDEWEB)

    Loechen, Liv Arntzen

    2011-07-01

    The vast and unexploited renewable energy potential and the introduction of green tariffs in 2009 have made Ukraine an attractive location for investors within the renewable energy sector. The Green Tariff system offers developers and investors the highest feed-in tariffs in Eastern Europe, and thus far covers alternative energy production from biomass, biogas, wind power plants and hydropower plants. Ukraine has a history in both large- and small hydro production. Whereas the potential of the country's big rivers is now to a great extent exploited, this is not the case for the smaller watercourses. Ukraine is well endowed with small rivers, approximately 60,000 of which can be classified as 'very small'. Most of these are located in the western part of the country, near the Carpathian Mountains. However, despite the natural potential, foreign investors should be aware of the potential risks and hurdles. The country has a huge problem with corruption, and the process of obtaining licenses is not straight forward. On the whole, it can be worthwhile exploring the possibilities of small hydro production in Ukraine for those who can deal with a high level of risk and uncertainty. If not, one would be better advised to look for investment locations elsewhere.(auth)

  3. Small hydro-electric potential: west Poverty Bay region

    Energy Technology Data Exchange (ETDEWEB)

    1981-07-01

    This study has identified six schemes in the Bay of Plenty Electric Power Board area and two in the Poverty Bay Electric Power Board area, of which five and one, respectively, are below the economic limit of $2400/kW suggested by the Ministry of Works and Development as of December 1979. Of these, only three appear both economically and environmentally acceptable. The Takaputahi and Torere schemes are not likely to proceed if the Ministry of Works and Development continue with their plans to develop the Motu River. Furthermore, the Motu Falls scheme is unlikely to proceed for environmental reasons. The schemes identified are not very attractive on the national scale and could not be justified on local terms. However, a detailed feasibility study of the Takaputahi/Torere diversion should be undertaken prior to a decision being made to proceed with the Motu development, or if the proposals are dropped. The present low load and slow growth of the area is such that prior to a small hydro-electric scheme being built, there would need to be an established demand for power.

  4. Electronic Control Of Small Hydro-Generators Part II

    International Nuclear Information System (INIS)

    Diaz B, Pedro; Torres M, Carlos A.

    1994-01-01

    The present project arises for the Colombian population's necessity to overcome the underdevelopment, the poverty, the education and the level of life in rural areas of difficult access, for an economic rural electrification. The UIS, by means of the advisory committee of investigations of the ability of Physical-mechanical Sciences and the ability of Electricity and Electronic, it begins the process of developing in 1991 a study of economic and reliable control for the handling of small micro-centrals. Providing from electric power to the rural sector is a world problem, and have more than enough this some countries (China, Nepal, Peru, The islands of Papua, New Guinea), they have made investigations, outlining and building central micro controlled by microprocessor. The present study is developed with the objective of carrying out a load control that acts reliable and quickly. Traditionally they have been come using mechanical governors, which are those in charge of making the load control by means of valves that regulate the flow of water in the turbines, involving this way big retards characteristic of any mechanical control. In summary, the electronic governor of load presents on the mechanical governor, the advantage of acting to more speed and consequently to maintain stable the frequency of the system. To continue with the study, the objective that this project must develop, is an electronic control of load which presents to a small hydro generator, a relatively constant and independent electric load that the demanded consumption for the user varies from none to full load, given as initial parameters a constant flow in the turbine and a control in the line tension. This way it seeks to improve the energy quality given by isolated generators

  5. Parametric distribution approach for flow availability in small hydro potential analysis

    Science.gov (United States)

    Abdullah, Samizee; Basri, Mohd Juhari Mat; Jamaluddin, Zahrul Zamri; Azrulhisham, Engku Ahmad; Othman, Jamel

    2016-10-01

    Small hydro system is one of the important sources of renewable energy and it has been recognized worldwide as clean energy sources. Small hydropower generation system uses the potential energy in flowing water to produce electricity is often questionable due to inconsistent and intermittent of power generated. Potential analysis of small hydro system which is mainly dependent on the availability of water requires the knowledge of water flow or stream flow distribution. This paper presented the possibility of applying Pearson system for stream flow availability distribution approximation in the small hydro system. By considering the stochastic nature of stream flow, the Pearson parametric distribution approximation was computed based on the significant characteristic of Pearson system applying direct correlation between the first four statistical moments of the distribution. The advantage of applying various statistical moments in small hydro potential analysis will have the ability to analyze the variation shapes of stream flow distribution.

  6. Small-scale hydro-electric scheme in Roches, Switzerland

    International Nuclear Information System (INIS)

    Hausmann, M.

    2006-01-01

    The small hydropower plant (SHPP) project 'PCH Roches' is planned to be built in Roches, a small village located in the Jura region of the canton of Bern. The goal of this undertaking is to reactivate a site with hydro potential of the river Birs on a section that was already well exploited by some ancient SHPP (since 1953 or probably even earlier). Several modifications were performed on this plant over the years; not all contributed positively on its production figures. Following a transfer of the water rights in 1987, claims became loud against the owner to perform maintenance on the river banks and to modify the weir such that a free passage for the fishes will be granted. Those issues contributed to inflate a conflict which ended in the repeal of the water rights and a total plant shut down in 2001. The new project plans to reuse the existing pen stock and to carry out some refurbishing activities to grant security and better performance. The weir and the intake structure are also redesigned such that the water storage can be somewhat raised for normal operation; a weir gate will however allow to better discharge the river in flood situations. A new turbine house will be erected at the current location where the tail water pen stock rejoins the river. Hence, the existing old turbine house will be obsolete and the upper and lower pen stock sections are to be linked with each other. Limited by the existing pen stock size, the new plant is expected to produce some 50 kW power and 362,000 kWh/year. This represents an increase in energy generation of around 200% compared with the ancient SHPP. Gross head is 5.38 m, net head 4.12 m with a turbine flow of at least 1.6 m 3 /s. The expected energy sales price applicable to this project reaches about 0.17 CHF/kWh as per the current tariffs set by the grid owner. This project calls for the building of a state-of-the-art SHPP. It will avoid the total dismantling of the existing works to take place and allow the small

  7. Current status and future developments of small and micro hydro in southern Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2012-05-01

    Full Text Available -1 Current status and future developments of small and micro hydro in southern Africa Wim Jonker Klunne Council for Scientific and Industrial Research (CSIR) PO Box 395 Pretoria 0001 South Africa Introduction Small and micro hydropower... are renewable energy technologies that have large potential in the south- ern African region, both for grid and off-grid applications. Within the region a good understanding exists on the potential for large scale hydro with a substantial number of plants...

  8. The Feasibility of Small Hydro-Electric Generation in a Large Urban Area

    OpenAIRE

    Benson Y. Zhang; Adam Taylor

    2012-01-01

    The possibilities of generating electric power from relatively small hydro-electric sources in a large urban area is investigated. Two different aspects of hydro-electric sources have been studied: storm/waste water pipes in large multi-tenanted residential buildings and urban storm water discharge area (CSI area). The potential to generate from these sources has been investigated using a micro-turbine. The potential electric power which could be extracted from the sources was estimated using...

  9. The development of small-hydro in China; Le developpement de la petite hydraulique en Chine

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, X. [United Nations Environment Programme, Riso (Denmark); Pan, J. [Chinese Academy of Social Sciences (China). Research Centre for Economic Development

    2007-04-15

    Small hydro is a renewable source of energy that is economically and technically viable. This article described China's investment in small-scale hydroelectric power plants in 1,600 remote communities. Seventy per cent of China's small hydro power stations are concentrated in remote impoverished communities. These power stations provide electricity to 300 million people in China, where half of the territories, one third of the districts and towns, and one quarter of the population depend primarily on this energy source for their electricity needs. The first power station was built in the province of Yunnan in 1912, but the real development of small hydro occurred after 1950, and can be divided into three phases. Phase 1 occurred before 1980 when small hydro power stations concentrated on providing electricity for lighting in rural areas as well as for transforming agriculture and irrigation. For many decades following the foundation of the Republic of China, rural areas did not have access to electricity or had serious shortages of electricity. In order to ensure electricity in isolated and remote areas, the Chinese government requested that local authorities build and exploit small hydro where conditions were favourable, and this while respecting water resources. Phase 2 occurred between 1980s and 1990s, with a focus on improving the performance of small hydro power stations to include electricity provisions for local enterprises. During phase 2, small hydro became a tool for dynamic rural development for farmers to increase their revenues. The latest phase in small hydro development has also helped reduce poverty and develop local economies, but in addition, it plays a role in the long term protection of ecosystems, the environment and rural modernization. Today 660,000 people work for small power stations and most are employed locally. Replacing firewood with electricity has saved 130,000 hectares of forested land and helped protect ecosystems. Small

  10. Liquid assets: factors contributing to the development of small hydro in China

    International Nuclear Information System (INIS)

    Pan, D.

    2006-01-01

    The rapid growth of small hydro capacity in China is reviewed. At present, the annual generation from rural small hydropower in China equates with the saving of 44 million tonnes of coal, or the emission of 110 million tonnes of carbon dioxide. Other environmental advantages such as a reduction in wood burning, reduced logging and therefore reduced soil erosion, are mentioned. Energy-starved China stood to gain much from the development of small hydro systems and government policy has been supportive in terms of relatively low tax rates and low interest loans. It is expected that due to the rapid economic growth in China, small-scale hydro will maintain its present level of development and continue to be promoted in a sound and rational manner. (author)

  11. A case study of small hydro and grid extension for rural electrification alternatives and complementarities

    International Nuclear Information System (INIS)

    Tebicke, H.L.; Mariam, H.G.

    1990-01-01

    This paper reports that rural electrification in Eastern and Southern African Countries (ESAC) has so far been based largely on stand-alone diesel electric generating plant or on the extension of high-voltage transmission grids fed by large hydro and/or thermal electric generating stations. The alternative of furnishing supply at modest investment and competitive cost from a nearby small- hydro plant has rarely been considered in those countries of the sub-region that have ample hydro-power resources. All countries in the sub-region (except Angola) import petroleum and/or petroleum product supplies, as well as all hardware for electricity supply and utilization. As a result, in most countries an acute shortage of foreign exchange severely hampers implementation of rural electrification schemes. This should turn attention increasingly to strategies which are less capital-intensive and less dependent on foreign exchange, such as small-hydro plants, where the resource is located near to rural demand. Increasing the local content of small-hydro project implementation has paid off in recent years, considerably reducing costs in a number of Asian and Latin American projects. Local contributions have taken the form of resource assessment at a particular site, design, construction works, and fabrication of relatively simple components of power plant such as hydraulic equipment, low pressure penstocks and gates, as well as simpler types of turbines (e.g., the Banki type). Inadequacy of indigenous technical capacity to make similar local contributions in the ESAC has meant that the few recent small-hydro projects have relied on importing both expertise and equipment. The high costs resulting have frequently fueled arguments against pursuit of small-hydro projects

  12. From concept to construction: a 15 MW small hydro project

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, S.; Neegan, K.

    1995-12-31

    An audio recording of an address by Chief Stanley Stephens and Deputy-Chief Ken Neegan of the Constance Lake First Nation, at the Renewable Energy Commercial Trade Show and Markets Conference was presented. The speech concerned development of a 15 MW hydro project on the reservation. Stephens recalled how initial opposition was overcome by addressing simple misconceptions about the project. The project was initiated by the Ontario Energy Corporation with a series of community discussions which addressed environmental impacts, and benefits that would result from the project. Neegan explained that after deliberation and negotiations, the Constance Lake First Nation was pleased with the project. This project was evidence that sound partnership could be formed between First Nations and hydro developers, while preserving respect for `Mother Earth` in the process. Trust between the community, the developers and government was considered to be the critical component of the project. Sound legal, technical, environmental and financial information was also indispensable in allowing the Constance Lake First Nation to make its decision to proceed with the project.

  13. From concept to construction: a 15 MW small hydro project

    International Nuclear Information System (INIS)

    Stephens, S.; Neegan, K.

    1995-01-01

    An audio recording of an address by Chief Stanley Stephens and Deputy-Chief Ken Neegan of the Constance Lake First Nation, at the Renewable Energy Commercial Trade Show and Markets Conference was presented. The speech concerned development of a 15 MW hydro project on the reservation. Stephens recalled how initial opposition was overcome by addressing simple misconceptions about the project. The project was initiated by the Ontario Energy Corporation with a series of community discussions which addressed environmental impacts, and benefits that would result from the project. Neegan explained that after deliberation and negotiations, the Constance Lake First Nation was pleased with the project. This project was evidence that sound partnership could be formed between First Nations and hydro developers, while preserving respect for 'Mother Earth' in the process. Trust between the community, the developers and government was considered to be the critical component of the project. Sound legal, technical, environmental and financial information was also indispensable in allowing the Constance Lake First Nation to make its decision to proceed with the project

  14. Small Classes 1, Vouchers 0.

    Science.gov (United States)

    Bracey, Gerald W.

    2000-01-01

    Alan Krueger's reanalyses of Eric Hanushek's school-productivity data show that Hanushek's "money doesn't matter" conclusions (influential in several states' education-finance hearings) have no factual basis. Hanushek excluded Tennessee's student/teacher ratio study (Project STAR). Also, class size is influencing students' success in…

  15. DAILY SCHEDULING OF SMALL HYDRO POWER PLANTS DISPATCH WITH MODIFIED PARTICLES SWARM OPTIMIZATION

    Directory of Open Access Journals (Sweden)

    Sinvaldo Rodrigues Moreno

    2015-04-01

    Full Text Available This paper presents a new approach for short-term hydro power scheduling of reservoirs using an algorithm-based Particle Swarm Optimization (PSO. PSO is a population-based algorithm designed to find good solutions to optimization problems, its characteristics have encouraged its adoption to tackle a variety of problems in different fields. In this paper the authors consider an optimization problem related to a daily scheduling of small hydro power dispatch. The goal is construct a feasible solution that maximize the cascade electricity production, following the environmental constraints and water balance. The paper proposes an improved Particle Swarm Optimization (PSO algorithm, which takes advantage of simplicity and facility of implementation. The algorithm was successfully applied to the optimization of the daily schedule strategies of small hydro power plants, considering maximum water utilization and all constraints related to simultaneous water uses. Extensive computational tests and comparisons with other heuristics methods showed the effectiveness of the proposed approach.

  16. Island operation - modelling of a small hydro power system

    Energy Technology Data Exchange (ETDEWEB)

    Skarp, Stefan

    2000-02-01

    Simulation is a useful tool for investigating a system behaviour. It is a way to examine operating situations without having to perform them in reality. If someone for example wants to test an operating situation where the system possibly will demolish, a computer simulation could be a both cheaper and safer way than to do the test in reality. This master thesis performs and analyses a simulation, modelling an electronic power system. The system consists of a minor hydro power station, a wood refining industry, and interconnecting power system components. In the simulation situation the system works in a so called island operation. The thesis aims at making a capacity analysis of the current system. Above all, the goal is to find restrictions in load power profile of the consumer, under given circumstances. The computer software used in simulations is Matlab and its additional program PSB (Power System Blockset). The work has been carried out in co-operation with the power supplier Skellefteaa Kraft, where the problem formulation of this master thesis was founded.

  17. SMALL HYDRO PLANTS IN LAND USE SYSTEM PLANNING IN POLAND

    Directory of Open Access Journals (Sweden)

    Anita Bernatek

    2014-10-01

    Full Text Available Small hydropower plants are present in the land use system planning in Poland. At the national level the important role of spatial planning in the development of renewable energy was highlighted, included small hydroplants. However, it seems that at the regional level this demand has not been realized. The necessity of developing small hydroplants as a renewable energy was highlighted, but negative environmental impact was not indicated. At local level legal instrument of small hydropower plants is specified.

  18. 78 FR 71601 - KC Small Hydro LLC; Advanced Hydropower, Inc.; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2013-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14521-001, 14561-000] KC Small Hydro LLC; Advanced Hydropower, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May 13, 2013, KC Scoby...

  19. optimal selection of hydraulic turbines for small hydro electric power

    African Journals Online (AJOL)

    eobe

    Keywords: optimal selection, SHP turbine, flow duration curve, energy efficiency, annual capacity factor. 1. INTRODUCTION ... depleted, with adverse environmental impacts downstream ..... Technologies, Financing Cogeneration and Small -.

  20. comparative measurement o river for small hydro tive measurement

    African Journals Online (AJOL)

    eobe

    Keywords: Keywords: small hydropower, electric power, volum ... gathering systems. .... or revolving cups connected to the end. ..... Also, the float velocity may have been affected by wind ... completely dedicated as off-grid supply can meet the.

  1. Small Group Multitasking in Literature Classes

    Science.gov (United States)

    Baurain, Bradley

    2007-01-01

    Faced with the challenge of teaching American literature to large, multilevel classes in Vietnam, the writer developed a flexible small group framework called "multitasking". "Multitasking" sets up stable task categories which rotate among small groups from lesson to lesson. This framework enabled students to work cooperatively…

  2. Small HydroPower (SHP) development in Nigeria: Issues ...

    African Journals Online (AJOL)

    Nigeria as of today generates less than 4000MW of electricity but has the capability of increasing her generation through small hydropower (SHP) considering unharnessed potentials in the country. In other to increase the percentage contribution of hydroelectricity to the total energy mix and to extend electricity to rural and ...

  3. Hydro-morphological modelling of small, wave-dominated estuaries

    Science.gov (United States)

    Slinger, Jill H.

    2017-11-01

    Small, intermittently open or closed estuaries are characteristic of the coasts of South Africa, Australia, California, Mexico and many other areas of the world. However, modelling attention has tended to focus on big estuaries that drain large catchments and serve a wide diversity of interests e.g. agriculture, urban settlement, recreation, commercial fishing. In this study, the development of a simple, parametric, system dynamics model to simulate the opening and closure of the mouths of small, wave-dominated estuaries is reported. In the model, the estuary is conceived as a basin with a specific water volume to water level relationship, connected to the sea by a channel of fixed width, but variable sill height. Changes in the form of the basin are not treated in the model, while the dynamics of the mouth channel are central to the model. The magnitude and direction of the flow through the mouth determines whether erosion or deposition of sediment occurs in the mouth channel, influencing the sill height. The model is implemented on the Great Brak Estuary in South Africa and simulations reveal that the raised low water levels in the estuary during spring tide relative to neap tide, are occasioned by the constriction of the tidal flow through the shallow mouth. Freshwater inflows to the estuary are shown to be significant in determining the behaviour of the inlet mouth, a factor often ignored in studies on tidal inlets. Further it is the balance between freshwater inflows and wave events that determines the opening or closure of the mouth of a particular estuary.

  4. Electronic Control Of Small Hydro-Generators Part 1

    International Nuclear Information System (INIS)

    Perez G, Alvaro; Romero A, Carlos E.

    1993-01-01

    This work is the beginning of several applied itineraries, to the government of micro-centrals, mainly directed to the control of electric variables of the generator with the desire of obtaining a system of electric generation to drop it climbs, economic, reliable and with great sense of use of the hydraulic resources guided to poor communities, isolated of the system of national interconnection. In all hydroelectric power station without caring their capacity is fundamental to govern the speed of the system turbine generator, to guarantee a constant frequency of 60 Hz, the stability of this parameter is a measure of the quality of the energy given to the user. The used regulation method is the mechanical governor, its action it is to control the flow of water that it enters to the turbine. For small generation power stations (smaller to 200 Kw), the mechanical governor's cost is comparable to the total cost of the plant, then it is economic to use an electronic load control. The project develops the load control whose function is to add external electric load to the generator to maintain the constant nominal active power and similar to the power nominal mechanics surrendered by the turbine. The microprocessor 8088 dedicated to the control of the system by the complexity of the process, the quantity of variables and the precision in the answer of the system is used. To carry out the investigation project a simulation program it was designed in computer that allows to know the answer of the load control ahead of time for different conditions of the user's operation. These results were answered with the obtained experimental values of the final tests of the team, throwing very near values to those calculated

  5. Assessment of small versus large hydro-power developments - a Norwegian case study

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Tor Haakon; Harby, Atle

    2010-07-01

    Full text: The era of new, large hydro-power development projects seems to be over in Norway. Partly as a response to this, a large number of applications for the development of smallscale hydro power projects up to 10 MW overflow the Water Resources and Energy Directorate, resulting in an extensive development of small tributaries and water courses in Norway. This study has developed a framework for the assessment and comparison of several small versus many large hydro-power projects based on a multi-criteria analysis (MCA) approach, and further tested this approach on planned or developed projects in the Helgeland region, Norway. Multi-criteria analysis is a decision-support tool aimed at providing a systematic approach for the comparison of various alternatives with often non-commensurable and conflicting attributes. At the same time, the technique enables complex problems and various alternatives to be assessed in a transparent and simple way. The MCA-software was in our case equipped with 2 overall criteria (objectives) with a number of sub criteria; Production with sub-criteria like volume of energy production, installed effect, storage capacity and economical profit; Environmental impacts with sub-criteria like fishing interests, biodiversity, protection of unexploited nature The data used in the case study is based on the planned development of Vefsna (large project) with the energy/effect production estimated and the environmental impacts identified as part of the feasibility studies (the project never reached the authorities' licensing system with a formal EIA). The small-scale hydro-power projects used for comparison are based on realized projects in the Helgeland region and a number of proposed projects, up scaled to the size of the proposed Vefsna-development. The results from the study indicate that a large number of small-scale hydro-power projects need to be implemented in order to balance the volume of produced electricity/effect from one

  6. Some impacts and mitigations for small hydro developments in Newfoundland and Labrador

    International Nuclear Information System (INIS)

    Buchanan, R.

    1993-01-01

    Potential adverse impacts of small hydro power plants were defined and some of the mitigative techniques that can be used to eliminate or alleviate these impacts were outlined. Potential adverse impacts involved in the construction of hydro projects were identified as those associated with construction of dams, borrow areas, access roads, powerhouses, canals, penstocks, and transmission lines. Fish passage and fish habitat maintenance were also among the major issues that confront most of the proposed small hydro projects in Newfoundland. Fish passage and habitat issues received particular attention in view of their obvious importance in a province where fishing is a way of life for large segments of the population. Major challenges included both upstream and downstream fish passage, and maintenance flows downstream of dams. Upstream migration could be facilitated by fishways. Downstream migration of Atlantic salmon smolts was said to be more problematic, but could be addressed by strategies such as intake design, screens, bypasses, sluices, turbine selection, plant shutdowns at critical times and operation of turbines at peak efficiencies. 12 refs., 2 tabs

  7. An approach to the investment analysis of small and medium hydro-power plants

    International Nuclear Information System (INIS)

    Forouzbakhsh, F.; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in 'Bookan, Iran' and SHPP in 'Nari, Iran'), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially

  8. The contribution of small hydro power stations to the electricity generation in Greece: Technical and economic considerations

    International Nuclear Information System (INIS)

    Kaldellis, J.K.

    2007-01-01

    Hydropower is the most widely used renewable energy source worldwide, contributing almost with 18.5% to the fulfillment of the planet electricity generation. However, most locations in Europe appropriate for the installation of large hydro power stations have already been exploited. Furthermore, there is a significant local communities' opposition towards new large power stations; hence, small hydro power stations remain one of the most attractive opportunities for further utilization of the available hydro potential. Greece and more precisely the country's mainland possesses a significant hydro-power potential which is up to now only partially exploited. In parallel, a large number of private investors have officially expressed their interest in creating small hydro power stations throughout the country, encouraged by the significant Greek State subsidy opportunities for renewable energy applications. However, up to now a relatively small number of projects have been realized, mainly due to decision-making problems, like the administrative bureaucracy, the absence of a rational national water resources management plan and the over-sizing of the proposed installations. Certainly, if the above problems are suitably treated, small hydro-power plants can be proved considerably profitable investments, contributing also remarkably to the national electricity balance and replacing heavy polluting lignite and imported oil. In the context of the above interesting issues, the present study reviews in detail the existing situation of small hydropower plants in Greece and investigates their future prospects as far as the energy, economic and environmental contribution are concerned

  9. Rebuilding the Chalberhoeni small hydro power station in Saanen, Switzerland; Chalberhoeni - Rapport Final

    Energy Technology Data Exchange (ETDEWEB)

    Cavin, G. [Stucky SA, Renens (Switzerland); Wagner, T. [Sigmaplan, Berne (Switzerland)

    2009-07-01

    These two final illustrated reports for the Swiss Federal Office of Energy (SFOE) deal with various aspects of the Chalberhoeni small hydro project in Saanen, Switzerland. The first report presents data on the catchment area involved, available head, residual water quantities, installed power and annual production figures. Investments and operating costs are looked at. The second report describes the project and discusses regional planning aspects, hydrological basics and environmental issues in connection with the renewal project, including details on invertebrates found in the stream and their relevance to fishing and nature protection issues.

  10. The Thur weir small hydro scheme in Muellheim; Projekt Thurwehr Muellheim. Programm Kleinwasserkraftwerke - Zwischenbericht

    Energy Technology Data Exchange (ETDEWEB)

    Jaeggi, F. [Isento AG c/o Atel EcoPower, Olten (Switzerland); Herrmann, Ch. [Tobias Rapp, BHAteam Ingenieure AG, Frauenfeld (Switzerland)

    2009-06-15

    This interim report for the Swiss Federal Office of Energy (SFOE) takes a look at a small hydro scheme in Muellheim, Switzerland. An existing weir that provides water for two small hydropower stations is to be augmented with a new installation at the weir. Three possible variants for the project are described and discussed. The topology, geology and hydrology of the location are examined. The project also involves a higher weir and the provision of a fish pass. Special consideration concerning the stability of a railway bridge just above the new weir is noted. The organisation of the building site and the six phases of the works to be carried out are discussed. The installation of two turbines is noted and their proposed energy production is commented on.

  11. Small hydro power project operating in cascade; Projeto de pequenas centrais hidreletricas operando em cascata

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Robson Siqueira Filadelfo dos [Minas Gerais Univ., Belo Horizonte (Brazil). Dept. de Engenharia Nuclear; Martinez, Carlos Barreira; Macedo, Alberto Amarante [Minas Gerais Univ., Belo Horizonte (Brazil). Dept. de Engenharia Hidraulica e Recursos Hidricos

    1999-07-01

    Small Hydro Power is a good option of generation mainly when they are located close to the consumers, because they demand smaller absolute value of invested capital and smaller time of maturation. Besides, the great repressed demand, mainly in the schedules of point, and the recovery of the values of the tariffs has been showed to private investor for this type of central. This paper develops a new method that allows to give agility to the study of small hydropower operating in cascade form in order to optimize the cost-benefit relationship of the enterprise. Approaches are presented for the evaluation of this type of system, the methodology of partition of falls and the proposed model. A case study, in which this method is applied, is shown at the end of this work. (author)

  12. An approach to the investment analysis of small and medium hydro-power plants

    Energy Technology Data Exchange (ETDEWEB)

    Forouzbakhsh, F. [University of Tehran (Iran). Faculty of Engineering; Hosseini, S.M.H. [Islamic Azad University, Tehran (Iran). Faculty of Engineering; Vakilian, M. [Sharif Institute of Technology, Tehran (Iran). Faculty of Electrical Engineering

    2007-02-15

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in ''Bookan, Iran'' and SHPP in ''Nari, Iran''), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially. (author)

  13. Retrofitting the small-scale hydro power plant 'La Chocolatiere' in Echandens-Bussigny, Switzerland

    International Nuclear Information System (INIS)

    2008-05-01

    This report for the Swiss Federal Office of Energy (SFOE) is a project study for the retrofitting of a small-scale hydro power plant installed on the River Venoge, between the communities of Echandens and Bussigny, western Switzerland. At this site, hydro power is used since the 18 th century. A permanent license to use at most 3 m 3 /s is available. The study concludes that the maximum flow rate of 6 m 3 /s would be more advantageous, implying a 35 cm higher dam on the river. Two turbines could then be installed, leading to the maximum electric power of 177 kW and the power production of 727,000 kWh/y. From the detailed inventory of the retrofitting work and the installation of the new turbines - including a new fish ladder according to the legislation in force - the authors conclude that electricity could be generated at a cost amounting to about CHF 0.24/kWh. It is recommended to request the modification of the water use license in order to be able to use up to 6 m 3 /s.

  14. The 'Lehn' small hydro-power station; KWKW Lehn Vorprojekt - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Ruff, H.; Widmer, P.

    2009-02-15

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) takes a look at the refurbishment of a small hydro-power station in the UNESCO biosphere region in the Entlebuch, Switzerland. The five grounds for the refurbishment are examined - repair of the water intake, flood protection, regulation of residual water, reduction of floating debris and sand and optimisation of the system by using automatic control. Figures on the cost of the refurbishment and electricity production are presented and discussed, as is the economic viability of the project. The existing installations are described and the hydrology of the stream is discussed, as are legal requirements and technical basics. Variants for the refurbishment are examined and operational aspects are looked at. A comprehensive appendix provides details on the proposal in graphical and tabular form.

  15. OVERVIEW OF A NEW METHOD FOR DESIGNING HIGH EFFICIENCY SMALL HYDRO POWER PLANTS

    Directory of Open Access Journals (Sweden)

    Milun Babić

    2010-01-01

    Full Text Available Significant number of research projects in the area of renewable energy sources (especially for small hydro power plants has been made within the Department for Energy and Process Engineering and Regional Euro Energy Efficiency Center at Faculty of Mechanical Engineering (University of Kragujevac, Serbia since early eighties. The results are various; numerous domestic and international recognition and technical performance tell about the success of the research. Research projects have been following the technical and technological development of research equipment and economy growth. This has led to the development of software for designing turbines of SHP plants. In order to notify the public about possibilities of our software, in this paper is briefly described a mathematical model and procedures for calculating and designing of SHPP for known conditions. As an argument for assessing the validity and potential of our research results is shown constructed SHP plant "Bosnia 1", 2 x 100 kW power.

  16. Realising the potential for the protection of the environment by developing small hydro power

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, R.; Heal, A.

    2000-07-01

    The RAPPIDS project was set up to tackle the conflicts arising from the development of Small Hydro Power (SHP) in sensitive and fragile environments. The project was focused on Snowdonia National Park, which was identified as a conflict area in the UK. The aim was to develop a strategy to overcome these conflicts locally through: improving the understanding of market actors, of the effects of SHP on the environment; improving dialogue between market actors; initiating collaboration to analyse the environmental impacts and test innovative technological measures for sensitive SHP development; Identifying successful environmental measures and assessing their suitability for transfer to other regions; raising the awareness of market actors, of the environmental benefits of SHP. The project in the UK was mirrored in 2 regions of Europe, under the EU Altener programme, and lessons learnt were shared between regions. (author)

  17. The application of the EMAS-ordinance to small hydro-power-plants

    International Nuclear Information System (INIS)

    Patek, R.

    2000-01-01

    The application of the eco-management and audit scheme ordinance to small hydro-power-plants deals with the possibility to take an environmental-relevant audition on sites of small hydro-power-plants to achieve the environmental EMAS-certificate. Within the realization of the acquired improvement steps also the efficiency of the power plants should be increased that the audit also becomes interesting in economic matters. Contents: after explaining the legal frame being prescribed by the European Community, its interpretation and relevance for the sites of SHP, common impacts of these on the environment are particularized. From these facts a valuation-catalogue has been developed, which will be used by the power plant-owners for the assessment of their sites to take part in the EMAS-system. This catalogue is split up into six modules, which comprise all possible valuation areas which can appear concerning the different kinds of plants. These modules are: MODUL A: backwater area; MODUL B: weir; MODUL C: powerhouse; MODUL D: tail water area; MODUL E: diversion channel / penstock; MODUL F: diversion section. Furthermore three submodules to gather common data concerning plant and river have been created. At the development of the catalogue there was particularly attached importance to a user-friendly application. The goal was to realize the valuation by the plant owners to minimize costs. To take objectiveness into account the module-catalogue was created in a way that auditors (the power plant owners) must not formulate specifications by themselves; the possible assessments only have to be marked with a cross at the corresponding parameters, which have been listed up. (author)

  18. Cost determination of the electro-mechanical equipment of a small hydro-power plant

    Energy Technology Data Exchange (ETDEWEB)

    Ogayar, B.; Vidal, P.G. [Grupo de Investigacion IDEA, Escuela Politecnica Superior, University of Jaen, Campus de Las Lagunillas, s/n. 23071-Jaen (Spain)

    2009-01-15

    One of the most important elements on the recovery of a small hydro-power plant is the electro-mechanical equipment (turbine-alternator), since the cost of the equipment means a high percentage of the total budget of the plant. The present paper intends to develop a series of equations which determine its cost from basic parameters such as power and net head. These calculations are focused at a level of previous study, so it will be necessary to carry out the engineering project and request a budget to companies specialized on the construction of electro-mechanical equipment to know its cost more accurately. Although there is a great diversity in the typology of turbines and alternators, data from manufacturers which cover all the considered range have been used. The above equations have been developed for the most common of turbines: Pelton, Francis, Kaplan and semiKaplan for a power range below 2 MW. The obtained equations have been validated with data from real installations which have been subject to analysis by engineering companies working on the assembly and design of small plants. (author)

  19. Preliminary study on the reactivation of the WERAP small hydro power station in Bubikon

    International Nuclear Information System (INIS)

    Bretscher, A.; Gutzwiller, S.

    2003-01-01

    This study on the revitalisation of a small hydro power station belonging to old spinning mill in Bubikon, Switzerland, proposes ideas for the reactivation of an old hydropower installation that once helped power a spinning mill. Details are given on the history of the mill and the hydrological conditions to be expected at the site. Three variants are proposed for the refurbishment, including the revision of the power station's existing 44 kW Francis turbine dating from 1908, the addition of further, similar Francis turbine or its replacement with a new 61 kW Francis turbine. The costs and amortisation of the refurbishment variants are examined, the revenues that can be expected from its operation and other financial factors are discussed. Further, environmental and legal aspects of the project are examined and suggestions are made for the next steps to be taken towards the realisation of this small hydropower plant. An annex provides photographs of the location and the power station's equipment

  20. Analysis and assessment of environmental impacts of small hydro power plant in Slovakia

    Science.gov (United States)

    Zeleňáková, M.; Fijko, R.; Remeňáková, I.

    2017-10-01

    Environmental impact assessment (EIA) is an important process that, prior to approval of the investment plan, can provide a detailed examination of the likely and foreseeable impacts of proposed construction activity on the environment. The objective of this paper is to apply a specific methodology for the analysis and evaluation of the environmental impacts of selected constructions, namely, small hydro power plant, using matrix of impacts. This analysis method is intended not only to increase the clarity and precision of the evaluation process, but also to align it with the requirements of the environmental impact assessment system. This modification should improve the reliability of the environmental impact assessment, and could moreover also be applied to other infrastructure projects. Comparison of alternatives and designation of the optimal variant are implemented based on selected criteria that objectively describe the characteristic lines of the planned alternatives of activity and their impact on the environment. The use of proper EIA procedures can help the decision-makers to formulate proper activities based on qualified decisions. The designed project in Spišské Bystré, Slovakia is used as a case study to clarify and exemplify the methodology and techniques.

  1. Analysis of the potential of small hydro-power installations - Preliminary study on hydro-power schemes on rivers; Programm Kleinwasserkraftwerke. Potenzialanalyse Kleinwasserkraftwerke - Vorstudie zu Kraftwerken an Fliessgewaessern

    Energy Technology Data Exchange (ETDEWEB)

    Baur, M.; Dettli, R. [econcept AG, Zuerich (Switzerland); Weingartner, R.; Viviroli, D.; Imhof, P.; Faessler, M.; Gerhardinger, H. [University of Berne, Geographisches Institut, Gruppe fuer Hydrologie (GIUB), Berne (Switzerland)

    2006-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results obtained from an analysis of the potential of small hydro-power installations in Switzerland. The current situation is reviewed and a 'bottom-up' analysis of the potential available is made. Data is presented on the potential of installations with power-ratings above and below 300 kW. Cantonal case-studies are examined. In a further 'top-down' examination, flow-rates and height-differences are looked at. The development of a 'potential-map' for Switzerland is described. The report is completed with the presentation of the conclusions made from the work. Suggestions for further work that could be done on the subject are made.

  2. The Meielsgrund and Turbach small hydro power stations in Saanen, Switzerland; PCH du Meielsgrund et PCH de Turbach - Rapports finaux

    Energy Technology Data Exchange (ETDEWEB)

    Cavin, G. [Stucky SA, Renens (Switzerland); Wagner, T. [Sigmaplan, Berne (Switzerland)

    2009-12-15

    These four final illustrated reports for the Swiss Federal Office of Energy (SFOE) deal with various aspects of two small hydro projects on two affluents of the river Saane in Switzerland. The first report presents two variants for the enhancement of the existing Meielsgrund installation as well as a new, parallel installation. The catchment area involved, available head, residual water quantities, installed power and annual production figures are discussed. Investments, operating costs and financial viability are also looked at. The second report describes the project and discusses regional planning aspects, hydrological basics and environmental issues in connection with the renewal project, including details on invertebrates found in the stream and their relevance to fishing and nature protection issues. The third and fourth reports concern the Turbach small hydro installation. The topics discussed in these two reports are basically similar to those considered for the Meielsgrund installation.

  3. Small Group Activities for Introductory Business Classes.

    Science.gov (United States)

    Mundrake, George

    1999-01-01

    Describes numerous small-group activities for the following areas of basic business education: consumer credit, marketing, business organization, entrepreneurship, insurance, risk management, economics, personal finance, business careers, global markets, and government regulation. (SK)

  4. Modelling energy production by small hydro power plants in collective irrigation networks of Calabria (Southern Italy)

    Science.gov (United States)

    Zema, Demetrio Antonio; Nicotra, Angelo; Tamburino, Vincenzo; Marcello Zimbone, Santo

    2017-04-01

    The availability of geodetic heads and considerable water flows in collective irrigation networks suggests the possibility of recovery potential energy using small hydro power plants (SHPP) at sustainable costs. This is the case of many Water Users Associations (WUA) in Calabria (Southern Italy), where it could theoretically be possible to recovery electrical energy out of the irrigation season. However, very few Calabrian WUAs have currently built SHPP in their irrigation networks and thus in this region the potential energy is practically fully lost. A previous study (Zema et al., 2016) proposed an original and simple model to site turbines and size their power output as well as to evaluate profits of SHPP in collective irrigation networks. Applying this model at regional scale, this paper estimates the theoretical energy production and the economic performances of SHPP installed in collective irrigation networks of Calabrian WUAs. In more detail, based on digital terrain models processed by GIS and few parameters of the water networks, for each SHPP the model provides: (i) the electrical power output; (iii) the optimal water discharge; (ii) costs, revenues and profits. Moreover, the map of the theoretical energy production by SHPP in collective irrigation networks of Calabria was drawn. The total network length of the 103 water networks surveyed is equal to 414 km and the total geodetic head is 3157 m, of which 63% is lost due to hydraulic losses. Thus, a total power output of 19.4 MW could theoretically be installed. This would provide an annual energy production of 103 GWh, considering SHPPs in operation only out of the irrigation season. The single irrigation networks have a power output in the range 0.7 kW - 6.4 MW. However, the lowest SHPPs (that is, turbines with power output under 5 kW) have been neglected, because the annual profit is very low (on average less than 6%, Zema et al., 2016). On average each irrigation network provides an annual revenue from

  5. An approach to the investment analysis of small and medium hydro-power plants

    DEFF Research Database (Denmark)

    Forouzbakhsh, Farshid; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Sincea large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments,however it is possible...

  6. New construction of the Wespimuehle small hydro power station in Winterthur, Switzerland; Stadt Winterthur (ZH). Neubau Kleinwasserkraftwerk Wespimuehle - Konzessionsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-12-15

    This report for the Swiss Federal Office of Energy (SFOE) presents a project concerning the renewal of an existing small hydro installation in the historical Wespimuehle on the Toess river in Winterthur, Switzerland. The existing installation is described as is the station's present concession. The proposals for the renewal of this installation are described and discussed, including water intake, electro-mechanical components and the station's tail water channel. The necessary building work and access to the installations are discussed. Investment, operating and maintenance costs are discussed. The expected profits to be gained from the new installation and the risks involved in the project are discussed.

  7. A Comparison of Prediction Methods for Design of Pump as Turbine for Small Hydro Plant: Implemented Plant

    Science.gov (United States)

    Naeimi, Hossein; Nayebi Shahabi, Mina; Mohammadi, Sohrab

    2017-08-01

    In developing countries, small and micro hydropower plants are very effective source for electricity generation with energy pay-back time (EPBT) less than other conventional electricity generation systems. Using pump as turbine (PAT) is an attractive, significant and cost-effective alternative. Pump manufacturers do not normally provide the characteristic curves of their pumps working as turbines. Therefore, choosing an appropriate Pump to work as a turbine is essential in implementing the small-hydro plants. In this paper, in order to find the best fitting method to choose a PAT, the results of a small-hydro plant implemented on the by-pass of a Pressure Reducing Valve (PRV) in Urmia city in Iran are presented. Some of the prediction methods of Best Efficiency Point of PATs are derived. Then, the results of implemented project have been compared to the prediction methods results and the deviation of from measured data were considered and discussed and the best method that predicts the specifications of PAT more accurately determined. Finally, the energy pay-back time for the plant is calculated.

  8. A Model for Teaching Large Classes: Facilitating a "Small Class Feel"

    Science.gov (United States)

    Lynch, Rosealie P.; Pappas, Eric

    2017-01-01

    This paper presents a model for teaching large classes that facilitates a "small class feel" to counteract the distance, anonymity, and formality that often characterize large lecture-style courses in higher education. One author (E. P.) has been teaching a 300-student general education critical thinking course for ten years, and the…

  9. Optimal Sizing Of An Off-Grid Small Hydro-Photovoltaic-Diesel Generator Hybrid Power System For A Distant Village

    Directory of Open Access Journals (Sweden)

    Adebanji B.

    2017-08-01

    Full Text Available This paper presented an optimal sizing technique for an off-grid hybrid system consisting of Small Hydro SHP system Photovoltaic PV modules Battery BATT banks and Diesel Generator DG. The objective cost function Annualized Cost System and the Loss of Power Supply Probability LPSP were minimized with application of Genetic Algorithm GA in order to reduce the Cost of Energy COE generation. GA compared to other convectional optimization methods has the ability to attain global optimum easily. The decision variables are the number of small hydro turbines NSHP number of solar panels NPV number of battery banks NBATT and the capacity of DG PDG. The proposed method was applied to a typical rural village Itapaji-Ekiti in Nigeria. The monthly average solar irradiance data were converted into hourly solar irradiance data for uniformity. Sensitivity analysis was also performed to identify the most important parameter influencing the optimized hybrid system. The optimal sizing result of the HPS is 954 kW of SHP 290 kW of PV panels 9500 sets of 600Ah battery strings and 350 kW of DG. The optimal Loss of Power Supply Probability LPSP is 0.0054 and the Renewable Fraction RF is 0.62 which is indeed a significant improvement on the environment and comparatively better than any other combinations in the system.

  10. 78 FR 77118 - KC Small Hydro, LLC; Notice of Amended Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2013-12-20

    ..., Motions To Intervene, and Competing Applications On May 28, 2013, KC Scoby Hydro, LLC, filed an... 28, 2013, application and sent an acceptance letter to KC Scoby Hydro, LLC. Subsequently, On October 28, 2013, KC Scoby Hydro, LLC, amended its preliminary permit application to change its name to KC...

  11. THE APPLICABILITY OF SMALL GROUP DISCUSSION IN ENGLISH READING CLASS

    Directory of Open Access Journals (Sweden)

    Kurniawan Yudhi Nugroho

    2017-04-01

    Full Text Available Success of learning is not only a matter of using an appropriate teaching resources, instead, the interference of teaching method is found to be essential to determine the students’ learning achievement. Teacher as a captain of class has the right to choose type of method used in the classroom for sake of students’ improvement. This study was designed as an attempt to help Master Students from a well established private university improve their reading comprehension skill through small group discussion. This study was participated by 30 students, later divided into two classes and served differently as an experimental group for the class A and a control group for the class B. Referring to the final data analysis of the study, it is found that there is an improving learning achievement in the experimental group, indicated by higher performance of posttest (20.333 than the pretest. Apart from this, further analysis was also conducted to find out whether or not small group discussion was able to show better performance than another teaching method applied in another different class. Based on the result of statistical calculation, it shows that small group discussion got better result 12.334 than that of another group. As a result, some suggestions were made by referring to result of the study.

  12. A Risk Analysis of Small-Hydro Power (SHP Plants Investments

    Directory of Open Access Journals (Sweden)

    Jorge Cunha

    2014-06-01

    Full Text Available The increase in electricity consumption has led to a sharp increase in energy demand which rose environmental and sustainability concerns. To address this issue, there has been an incentive to resource to renewable energy sources for electricity production. Departing from a real case study, the investment appraisal of a SHP project under the present market conditions is described, followed by a sensitivity analysis in order to identify the main sources of risk. The main results obtained showed that in the context of a regulated tariff the project is worthwhile due to a positive NPV. However, if electricity had to be sold at market prices, the project becomes unprofitable. Theresults put also in evidence the vulnerability of the investment to an adverse change in interest rates. Future SHP plant investments should take into account the need to operate in a free market and to compete with technologies based on fossil fuels or large hydro.

  13. Policy and regulatory framework conditions for small hydro power in Sub-Saharan Africa

    Energy Technology Data Exchange (ETDEWEB)

    Koelling, Fritz [Sustainable Energy and Environment, Karlsruhe (Germany); Gaul, Mirco; Schroeder, Miriam [SiNERGi Consultancy for Renewable Energies, Berlin (Germany)

    2011-07-01

    The vast potential of mini and micro hydro power (MHP) in Sub-Saharan African countries is one promising option to cover increasing energy demand and to enable electricity access for remote rural communities. Based on the analysis of 6 African countries (Ethiopia, Kenya, Mozambique, Nigeria, Rwanda, South Africa), this study sheds light on some of the main barriers on the level of political and regulatory framework conditions which include gap between the national-level policies and regulations and local MHP project implementation, lack of financing and limited capacities for project planning, building and operation. The paper also identifies some promising practices employed in several SSA countries of how to overcome these barriers and concludes with recommendations of how to create positive feed-backs between ambitious policies and regulations and MHP financing and capacity development needs in order to scale up MHP deployment and MHP sector development. (orig.)

  14. Recent experience of IFFM PAS in the design process of lowhead propeller hydraulic turbines for Small Hydro

    International Nuclear Information System (INIS)

    Kaniecki, M; Krzemianowski, Z

    2010-01-01

    The paper contains the short description of the design process of the axial flow turbines for Small Hydro. The crucial elements of the process are: ARDES programme for 1D inverse problem (containing the statistic information of the well performed hydraulic units, applying the lifting aerofoil theory); determination of universal hill diagram and optimization of the runner blades geometry by utilization of the 3D CFD codes. As the result of design process with utilization of both design steps, the generated runner blades geometry (1D inverse problem) and some computational results of 3D CFD solver have been presented. As the conclusion some crucial remarks of the designed process have been brought forward.

  15. Projects for small hydro-power installations in the Canton of Uri, Switzerland; Kanton Uri. Projekte fuer Kleinwasserkraftwerke - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-11-15

    This report for the Swiss Federal Office of Energy (SFOE) on a preliminary study presents and discusses small-hydro projects at three locations in the Swiss Canton of Uri. Three of originally six potential locations were selected for further investigation. Factors such as the usable quantities of water available at the locations are discussed. The projects Brunnital, Gruonbach and Palanggenbach are discussed in detail. Water quantities and various components of the installations such as water intakes, de-sanding installations, pressure conduits, machine houses and tailrace channels are described, as is the electro-mechanical equipment proposed. Also, environmental aspects are dealt with. Annual electricity production and economic viability are further topics covered in the report.

  16. Current status and future developments of small and micro hydro in southern Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2015-01-01

    Full Text Available of plants are in operation or under development. Small and micro hydropower are less well understood. Historically small hydropower has played an important role in the development of the region, but since mid 1960s the emphasis has been on fossil fuel based...

  17. The 'Chriz' small hydro project; Kleinkraftwerk Chriz - Konzessionsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Amacker, P.

    2008-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at the project for the renewal of a small hydropower installation in the village of Eischoll in the Swiss Alps. The history of the power station is reviewed and its present state is analysed. The possibilities for its renewal and project financing are discussed, as are rights concerning the use of water and regional planning aspects. The project foresees the use of various older installations and the construction of a new turbine house in the valley. Details on dimensions, the proposed installed power and energy production of the scheme are presented as well as details on the connection to the electricity mains. Environmental aspects and details on the costs and time-scales involved in the construction of the small power station are presented.

  18. Retrofitting of the small hydro electric scheme 'Moulin d'en Bas' in Cronay, Switzerland - Preliminary project

    International Nuclear Information System (INIS)

    2007-09-01

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) is a feasibility study for the retrofitting of the small hydro electric scheme 'Moulin d'en Bas' located in Cronay on the Mentue river, Switzerland. Two variants are considered. In the first one the existing scheme uses a 4.72 m water fall and its power amounts to about 25 kW. A 4-blades Kaplan turbine is foreseen to generate 160,000 kWh/y. In the second variant, weir and penstock have to be adapted in order to take advantage of the full 6.74 m water fall indicated in the water-use concession granted in 1952. A new fish pass has to be built as well. The resulting electric power is in this case 80 kW and the power generation by the turbo group 353,000 kWh/y, about 60% of which in the wintertime. Electricity production cost is estimated to be 0.282 CHF/kWh in the second variant.

  19. The potential for small-scale hydro power in Romania: a call for more co-ordinated governance

    Energy Technology Data Exchange (ETDEWEB)

    Luta, Alexandru

    2011-07-01

    Romania offers significant untapped resources for the development of small-scale hydro (SSH). The technology has been deployed before and is preserved. Projected increases in the demand for electricity coupled with the expected decommissioning of inefficient thermal capacity means that plenty of scope exists for adding capacity in Romania. It is questionable though whether the present lavish treatment of renewables is sustainable. The excessive burden placed on consumers given the likely policy overshoot raises questions about the sustainability of the Green Certificate scheme under the present form. Real hurdles about SSH projects persist in identifying sites, acquiring land and obtaining permits. The key hindrances to a more thorough expansion of SSH in Romania have to do with decision-making transparency, policy predictability and information diffusion. The erratic nature of Romanian renewables policy is directly connected to slow pace of the Romanian authorities in learning how to coordinate policy implementation between the local, central and European level in an effective manner. But given that that no fundamental regulatory transformation occur over the next year or two and that in that interval the issuance of permits and the acquisition of property is standardized, SSH may yet prove a fruitful line of business in Romania.(auth)

  20. Evaluation of the small-scale hydro-energetic potential in micro-basins in Colombia

    International Nuclear Information System (INIS)

    Torres Q, E.; Castillo C, J.J.

    1995-01-01

    A definition of the small-scale hydroelectric power plants (PCHs, abbreviations in Spanish), its classification according to potency and fall and its classification as utilization form is present. The general parameters to PCHs design in aspects as topography studies, geology and geotechnical studies and hydrologic studies are described. The primary elements of a PCH, as dam (little dam), conduction, tank of charge, sand trap (water re claimer), floodgate, grating (network), pressure's pipe, fall, principal valve and turbine are shown. In the study of potential of micro-basins, general points as topography, draining, population, supply and demand of electric energy, morphology, hydrology, geology and hydraulic potential are consider

  1. Theoretical and conditional monitoring of a small three-bladed vertical-axis micro-hydro turbine

    International Nuclear Information System (INIS)

    Huang, Sy-Ruen; Ma, Yen-Huai; Chen, Chia-Fu; Seki, Kazuichi; Aso, Toshiyuki

    2014-01-01

    Highlights: • This paper presents a novel 3 three-bladed vertical-axis micro-hydro turbine system. • This paper presents structure and performance of micro-hydroelectric turbine system. • The paper reveal that using VAMHT system in water is distinct from using in wind. • This paper present an experimental results of VAMHT system. • The paper show that the status transformation from cut-into stable power generation is short. - Abstract: This paper presents a novel 3-kW three-bladed vertical-axis micro-hydro turbine (VAMHT) system. The experimental results reveal that using this type of turbine in water is distinct from using it in wind. The micro-hydro turbine system uses a three-phase permanent magnet symmetric generator that transforms mechanical energy into electrical energy. The output voltage and frequency of the generator depend on water flow speed, and voltage steady equipment is used to maintain the maximum output power of the DC bus. According to the maximum power point tracking of the micro-hydro turbine system, the condition monitoring of the novel micro-hydro turbine requires no water flow meter. Furthermore, the construction and installation of the new micro-hydro turbine is simple, economical, and stable. This system combines a micro-hydro generator and electrical state-monitoring system, which can measure the speed, output power, DC-bus voltage, and all electrical characteristics of the micro-hydro turbine system. The results of comparing turbine between wind and water show that the speed ranges of water flow is narrower than that of wind, and the status transformation from cut-into stable power generation is short

  2. Small hydro project in Wohlen, Bern - Preliminary study; Programm Kleinwasserkraftwerke. KWKW Hofenmuehle, Wohlen BE - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    Fritschi, M.; Spescha, P.

    2008-11-15

    This report for the Swiss Federal Office of Energy (SFOE) presents the preliminary project study for the refurbishment of an existing small hydropower installation in Wohlen, Bern, Switzerland. The installation is in the Hofenmuehle, a listed mill complex dating from the first half of the nineteenth century. The headrace channel has already been refurbished by a community service group. The high level of financial effort and the idealism of the owner families are noted. The existing installations are described in detail. The refurbishment of the technical equipment and the associated work such as water-flow measurements are discussed. Cost estimates and environmental aspects are presented and discussed as are the financing of the refurbishment work and the cost-covering remuneration for the power produced. A possible increase in the power produced and the associated water-usage concession are discussed.

  3. Techno-economic evaluation of small hydro power plants in Greece: a complete sensitivity analysis

    International Nuclear Information System (INIS)

    Kaldellis, J.K.; Vlachou, D.S.; Korbakis, G.

    2005-01-01

    Hydropower has by far been the most mature renewable energy resource used for electricity generation in our planet. Recently, the investors' interest was whipped up by the mass development of small hydropower (SHP) stations, as they are the most prosperous for additional hydropower penetration in developed electricity markets. In Greece, the increasing interest for building SHP stations got off the ground since 1994. Ever since, an enormous number of requests keep piling up in the Greek Regulatory Authority of Energy and the Ministry of Development, with the object of creating new SHP stations of total capacity over 600 MW. The present work is concentrated on the systematic investigation of the techno-economic viability of SHP stations. The study is concluded by a sensitivity analysis properly adapted for the local market financial situation, in order to enlighten the decision makers on the expected profitability of the capital to be invested. According to the results obtained, the predicted internal rate of return (IRR) values are greater than 18% for most SHP cases analysed. Finally, as per the sensitivity analysis carried out, the installation capacity factor, the local market electricity price annual escalation rate and the reduced first installation cost are found to be the parameters that mostly affect the viability of similar ventures

  4. A novel class of small molecule inhibitors of HDAC6.

    Science.gov (United States)

    Inks, Elizabeth S; Josey, Benjamin J; Jesinkey, Sean R; Chou, C James

    2012-02-17

    Histone deacetylases (HDACs) are a family of enzymes that play significant roles in numerous biological processes and diseases. HDACs are best known for their repressive influence on gene transcription through histone deacetylation. Mapping of nonhistone acetylated proteins and acetylation-modifying enzymes involved in various cellular pathways has shown protein acetylation/deacetylation also plays key roles in a variety of cellular processes including RNA splicing, nuclear transport, and cytoskeletal remodeling. Studies of HDACs have accelerated due to the availability of small molecule HDAC inhibitors, most of which contain a canonical hydroxamic acid or benzamide that chelates the metal catalytic site. To increase the pool of unique and novel HDAC inhibitor pharmacophores, a pharmacological active compound screen was performed. Several unique HDAC inhibitor pharmacophores were identified in vitro. One class of novel HDAC inhibitors, with a central naphthoquinone structure, displayed a selective inhibition profile against HDAC6. Here we present the results of a unique class of HDAC6 inhibitors identified using this compound library screen. In addition, we demonstrated that treatment of human acute myeloid leukemia cell line MV4-11 with the selective HDAC6 inhibitors decreases levels of mutant FLT-3 and constitutively active STAT5 and attenuates Erk phosphorylation, all of which are associated with the inhibitor's selective toxicity against leukemia.

  5. Small-scale hydro-electric scheme in Roches, Switzerland; Projet de concession. Petite centrale hydroelectrique de Roches

    Energy Technology Data Exchange (ETDEWEB)

    Hausmann, M.

    2006-07-01

    The small hydropower plant (SHPP) project 'PCH Roches' is planned to be built in Roches, a small village located in the Jura region of the canton of Bern. The goal of this undertaking is to reactivate a site with hydro potential of the river Birs on a section that was already well exploited by some ancient SHPP (since 1953 or probably even earlier). Several modifications were performed on this plant over the years; not all contributed positively on its production figures. Following a transfer of the water rights in 1987, claims became loud against the owner to perform maintenance on the river banks and to modify the weir such that a free passage for the fishes will be granted. Those issues contributed to inflate a conflict which ended in the repeal of the water rights and a total plant shut down in 2001. The new project plans to reuse the existing pen stock and to carry out some refurbishing activities to grant security and better performance. The weir and the intake structure are also redesigned such that the water storage can be somewhat raised for normal operation; a weir gate will however allow to better discharge the river in flood situations. A new turbine house will be erected at the current location where the tail water pen stock rejoins the river. Hence, the existing old turbine house will be obsolete and the upper and lower pen stock sections are to be linked with each other. Limited by the existing pen stock size, the new plant is expected to produce some 50 kW power and 362,000 kWh/year. This represents an increase in energy generation of around 200% compared with the ancient SHPP. Gross head is 5.38 m, net head 4.12 m with a turbine flow of at least 1.6 m{sup 3}/s. The expected energy sales price applicable to this project reaches about 0.17 CHF/kWh as per the current tariffs set by the grid owner. This project calls for the building of a state-of-the-art SHPP. It will avoid the total dismantling of the existing works to take place and allow

  6. How can small hydro energy and other renewable energy mitigate impact of climate change in remote Central Africa: Cameroon case study.

    Science.gov (United States)

    Kenfack, Joseph; Bignom, Blaise

    2015-04-01

    Central Africa owns important renewable energy potential, namely hydro, solar and biomass. This important potential is still suffering from poor development up to the point where the sub region is still abundantly using the fossil energy and biomass as main power source. This is harmful to the climate and the situation is still ongoing. The main cause of the poor use of renewable energy is the poor management of resources by governments who have not taken the necessary measures to boost the renewable energy sector. Since the region is experiencing power shortage, thermal plants are among other solutions planned or under construction. Firewood is heavily used in remote areas without a sustainability program behind. This solution is not environment friendly and hence is not a long term solution. Given the fact that the region has the highest hydro potential of the continent, up to one-quarter of the world's tropical forest, important oil production with poor purchase power, the aim of this paper is to identify actions for improved access to sustainable, friendly, affordable energy services to users as well as a significant improvement of energy infrastructure in Central Africa and the promotion of small hydro and other renewable energy. The work will show at first the potential for the three primary energy sources which are solar, biomass and hydro while showing where available the level of development, with an emphasis on small hydro. Then identified obstacles for the promotion of clean energy will be targeted. From lessons learned, suggestions will be made to help the countries develop an approach aiming at developing good clean energy policy to increase the status of renewable energy and better contribute to fight against climate change. Cameroon has a great renewable energy potential and some data are available on energy. From the overview of institutional structure reform of the Cameroon power sector and assessments, specific suggestions based on the weaknesses

  7. The St. Niklausen drinking-water powered, small hydro scheme in Bad Ragaz; Gemeinde Bad Ragaz - Trinkwasserkraftwerk St. Niklausen - Vorstudie Bericht

    Energy Technology Data Exchange (ETDEWEB)

    Rueesch, T.

    2009-04-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at the results a preliminary study on the installation of a drinking-water powered small hydro scheme in Bad Ragaz, Switzerland. The installation of new pressure pipes and a new balancing reservoir are proposed. Three variants are proposed and discussed, two of which are considered as being economically viable. The various new installations and components proposed are described and discussed. Investment considerations, energy production and costs are looked at as well as support from the Swiss scheme for the cost-covering remuneration for electricity from renewable energy sources. The report is augmented with photos and plans.

  8. Crystal Structure of Saccharomyces cerevisiae ECM4, a Xi-Class Glutathione Transferase that Reacts with Glutathionyl-(hydro)quinones

    Science.gov (United States)

    Schwartz, Mathieu; Didierjean, Claude; Hecker, Arnaud; Girardet, Jean-Michel; Morel-Rouhier, Mélanie; Gelhaye, Eric; Favier, Frédérique

    2016-01-01

    Glutathionyl-hydroquinone reductases (GHRs) belong to the recently characterized Xi-class of glutathione transferases (GSTXs) according to unique structural properties and are present in all but animal kingdoms. The GHR ScECM4 from the yeast Saccharomyces cerevisiae has been studied since 1997 when it was found to be potentially involved in cell-wall biosynthesis. Up to now and in spite of biological studies made on this enzyme, its physiological role remains challenging. The work here reports its crystallographic study. In addition to exhibiting the general GSTX structural features, ScECM4 shows extensions including a huge loop which contributes to the quaternary assembly. These structural extensions are probably specific to Saccharomycetaceae. Soaking of ScECM4 crystals with GS-menadione results in a structure where glutathione forms a mixed disulfide bond with the cysteine 46. Solution studies confirm that ScECM4 has reductase activity for GS-menadione in presence of glutathione. Moreover, the high resolution structures allowed us to propose new roles of conserved residues of the active site to assist the cysteine 46 during the catalytic act. PMID:27736955

  9. Small-scale hydro-power plant in Quinto - Preliminary project; Progetto minicentrale idroelettrica, Ri Secco - Quinto. Programma piccole centrali idrauliche. Progetto di massima

    Energy Technology Data Exchange (ETDEWEB)

    Dotti, R. [Reali e Guscetti SA, Ambri (Switzerland); Rosselli, P. [Celio Engineering SA, Ambri (Switzerland)

    2009-06-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the alpine stream 'Ri Secco' in the municipality of Quinto, southern Switzerland. The Ri Secco partly flows in a steep canyon. The elevation difference of 810 or 620 m (depending on the location of the water deviation from the stream) is favorable to the installation of a small-scale high-head power plant. The report presents details on the hydrological data and the dimensioning of the installation. Several variants are considered, which also include two possible penstock diameters for each weir location. The electricity production expected is discussed, as is the economic viability of the project.

  10. Micro Hydro-Electric Energy Generation- An Overview

    OpenAIRE

    S. O. Anaza; M. S. Abdulazeez; Y. A. Yisah; Y. O. Yusuf; B. U. Salawu; S. U. Momoh

    2017-01-01

    Energy is required now more than ever due to population growth, industrialization and modernization. Challenges such as carbon dioxide (CO2) emissions and depletion of conventional source of energy necessitate for renewable sources, of which hydro energy seems to be the most predictable. Micro-hydro which is hydro energy in a “small” scale provides electricity to small communities by converting hydro energy into electrical energy. This paper is an overview of micro-hydro system by reviewing s...

  11. Rural hydro technology

    International Nuclear Information System (INIS)

    Fowlie, M.

    1999-01-01

    This paper examines the increasing use of micro hydroelectric schemes for power generation in mountainous communities in Asia to alleviate some of the pressures on forests. An example of such a scheme in Pakistan is given, and the installation and operation of small hydro units, socio-economic factors, and the impact of the projects on the position of women in the community are discussed. (UK)

  12. Retrofitting of the small hydro electric scheme 'Moulin de Bavois' - Feasibility study; Rehabilitation du Moulin de Bavois. Etude d'avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-15

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) is a feasibility study of the retrofitting of the small hydro electric scheme 'Moulin de Bavois' located in Bavois on the Talent river, Switzerland. The existing scheme uses a 12 m water fall and its power amounts to about 10 kW. After retrofitting, based on a future new water-use concession, the maximum electric power produced should be 172 kW, generating 531 MWh/y, 65% of which in the wintertime. New weir and penstock are foreseen as is an axial Kaplan turbine and a reliable water cleaning device. The Talent river flows in the woods. Electricity production cost is estimated to be 0.214 CHF/kWh.

  13. Total renewal of a small hydro project on the Engstligenalp - Licence and construction project; Bergbahnen Engstligenalp AG - Gesamterneuerung Kleinwasserkraftwerk. Konzessions- und Bauprojekt - Technischer Bericht mit Beilagen

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M.

    2009-05-15

    This report for the Swiss Federal Office of Energy (SFOE) deals with the total renewal of a small hydro scheme operated by the Engstligenalp aerial cableway in Switzerland. The cableway operator considers itself as part of the national effort to support sustainability. The refurbished hydropower installation will produce power for around 500 homes. The hydrology of the catchment area involved, quantities of water available and residual water conditions as well as the existing installations are described and discussed. Stipulations concerning landscape conservation are noted. The renewal project is discussed and details are given on the dam, water intake, pressure pipe and regulation. The new underground facilities for the horizontal-axis turbine, generator and electrical equipment are described. Finally environmental aspects, energy production and economic viability are discussed.

  14. Hydro adventurers

    International Nuclear Information System (INIS)

    Wood, Janet

    2000-01-01

    Some of the changes brought about by privatisation of the hydroelectric power industry in Ecuador are discussed. At present, about 25% of the population has no electricity supply; in the remaining areas demand is increasing. Seven new facilities are presently under discussion and these are described briefly. A plant at Abitugua is to be developed as a 'merchant plant' and the meaning and implications of this are described in detail. The present financing programme for Abituaga and an alternative financing programme are detailed. By 2010, some 40% of Ecuador's electricity is expected to come from hydro

  15. A new class of pluripotent stem cell cytotoxic small molecules.

    Directory of Open Access Journals (Sweden)

    Mark Richards

    Full Text Available A major concern in Pluripotent Stem Cell (PSC-derived cell replacement therapy is the risk of teratoma formation from contaminating undifferentiated cells. Removal of undifferentiated cells from differentiated cultures is an essential step before PSC-based cell therapies can be safely deployed in a clinical setting. We report a group of novel small molecules that are cytotoxic to PSCs. Our data indicates that these molecules are specific and potent in their activity allowing rapid eradication of undifferentiated cells. Experiments utilizing mixed PSC and primary human neuronal and cardiomyocyte cultures demonstrate that up to a 6-fold enrichment for specialized cells can be obtained without adversely affecting cell viability and function. Several structural variants were synthesized to identify key functional groups and to improve specificity and efficacy. Comparative microarray analysis and ensuing RNA knockdown studies revealed involvement of the PERK/ATF4/DDIT3 ER stress pathway. Surprisingly, cell death following ER stress induction was associated with a concomitant decrease in endogenous ROS levels in PSCs. Undifferentiated cells treated with these molecules preceding transplantation fail to form teratomas in SCID mice. Furthermore, these molecules remain non-toxic and non-teratogenic to zebrafish embryos suggesting that they may be safely used in vivo.

  16. Small-scale hydro-power plant in Anzonico - Preliminary project; Progetto microcentrale idroelettrica, Anzonico. Programma Centrali idrauliche. Progetto di massima

    Energy Technology Data Exchange (ETDEWEB)

    Dotti, R. [Reali e Guscetti SA, Ambri (Switzerland); Rosselli, P. [Celio Engineering SA, Ambri (Switzerland)

    2009-01-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant in the municipality of Anzonico, southern Switzerland. The water of a small alpine stream is to be used for power generation and vineyard irrigation as well as for the creation of an additional water resource for fire fighting in this sensitive region. The report is foreseen to support the request for a water usage concession to the authorities of the Canton of Ticino. It presents details on the hydrological data for the river and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as is the removal of river sediment. The electricity production expected is discussed, as is the economic viability of the project. Synergies exist with the local electricity utility that will renew and improve its power distribution and telecommunication system when the penstock will be mounted in the underground.

  17. Remote micro hydro

    Energy Technology Data Exchange (ETDEWEB)

    1985-03-01

    The micro-hydro project, built on a small tributary of Cowley Creek, near Whitehorse, Yukon, is an important step in the development of alternative energy sources and in conserving expensive diesel fuel. In addition to demonstrating the technical aspects of harnessing water power, the project paved the way for easier regulatory procedures. The power will be generated by a 9 meter head and a 6 inch crossflow turbine. The 36 V DC power will be stored in three 12 V batteries and converted to ac on demand by a 3,800 watt inverter. The system will produce 1.6 kW or 14,016 kWh per year with a firm flow of 1.26 cfs. This is sufficient to supply electricity for household needs and a wood working shop. The project is expected to cost about $18,000 and is more economical than tying into the present grid system, or continuing to use a gasoline generator. An environmental study determined that any impact of the project on the stream would be negligible. It is expected that no other water users will be affected by the project. This pilot project in micro-hydro applications will serve as a good indicator of the viability of this form of alternate energy in the Yukon. The calculations comparing the micro-hydro and grid system indicate that the mico-hydro system is a viable source of inflation-proof power. Higher heads and larger flow resulting in ac generation in excess of 10 kW would yield much better returns than this project. 3 tabs.

  18. Medical Students Perceive Better Group Learning Processes when Large Classes Are Made to Seem Small

    Science.gov (United States)

    Hommes, Juliette; Arah, Onyebuchi A.; de Grave, Willem; Schuwirth, Lambert W. T.; Scherpbier, Albert J. J. A.; Bos, Gerard M. J.

    2014-01-01

    Objective Medical schools struggle with large classes, which might interfere with the effectiveness of learning within small groups due to students being unfamiliar to fellow students. The aim of this study was to assess the effects of making a large class seem small on the students' collaborative learning processes. Design A randomised controlled intervention study was undertaken to make a large class seem small, without the need to reduce the number of students enrolling in the medical programme. The class was divided into subsets: two small subsets (n = 50) as the intervention groups; a control group (n = 102) was mixed with the remaining students (the non-randomised group n∼100) to create one large subset. Setting The undergraduate curriculum of the Maastricht Medical School, applying the Problem-Based Learning principles. In this learning context, students learn mainly in tutorial groups, composed randomly from a large class every 6–10 weeks. Intervention The formal group learning activities were organised within the subsets. Students from the intervention groups met frequently within the formal groups, in contrast to the students from the large subset who hardly enrolled with the same students in formal activities. Main Outcome Measures Three outcome measures assessed students' group learning processes over time: learning within formally organised small groups, learning with other students in the informal context and perceptions of the intervention. Results Formal group learning processes were perceived more positive in the intervention groups from the second study year on, with a mean increase of β = 0.48. Informal group learning activities occurred almost exclusively within the subsets as defined by the intervention from the first week involved in the medical curriculum (E-I indexes>−0.69). Interviews tapped mainly positive effects and negligible negative side effects of the intervention. Conclusion Better group learning processes can be

  19. Medical students perceive better group learning processes when large classes are made to seem small.

    Science.gov (United States)

    Hommes, Juliette; Arah, Onyebuchi A; de Grave, Willem; Schuwirth, Lambert W T; Scherpbier, Albert J J A; Bos, Gerard M J

    2014-01-01

    Medical schools struggle with large classes, which might interfere with the effectiveness of learning within small groups due to students being unfamiliar to fellow students. The aim of this study was to assess the effects of making a large class seem small on the students' collaborative learning processes. A randomised controlled intervention study was undertaken to make a large class seem small, without the need to reduce the number of students enrolling in the medical programme. The class was divided into subsets: two small subsets (n=50) as the intervention groups; a control group (n=102) was mixed with the remaining students (the non-randomised group n∼100) to create one large subset. The undergraduate curriculum of the Maastricht Medical School, applying the Problem-Based Learning principles. In this learning context, students learn mainly in tutorial groups, composed randomly from a large class every 6-10 weeks. The formal group learning activities were organised within the subsets. Students from the intervention groups met frequently within the formal groups, in contrast to the students from the large subset who hardly enrolled with the same students in formal activities. Three outcome measures assessed students' group learning processes over time: learning within formally organised small groups, learning with other students in the informal context and perceptions of the intervention. Formal group learning processes were perceived more positive in the intervention groups from the second study year on, with a mean increase of β=0.48. Informal group learning activities occurred almost exclusively within the subsets as defined by the intervention from the first week involved in the medical curriculum (E-I indexes>-0.69). Interviews tapped mainly positive effects and negligible negative side effects of the intervention. Better group learning processes can be achieved in large medical schools by making large classes seem small.

  20. The 'Alte Ziegelei' small hydro-power installation in Derendingen, Switzerland; Kleinwasserkraftwerk alte Ziegelei in Derendingen. Programm Kleinwasserkraftwerke. Erfahrungs- und Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Koehli, T.

    2006-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) discusses the experience gained with a small hydro-power installation in Derendingen, Switzerland. This unique 'micro' installation uses an archimedian screw to produce 6.8 kW of power from a head of 1.15 m and a through-flow of 800 - 1000 litres per second. Optimisation of the project is discussed as are the effects of changing water levels above and below the screw. Winter operation is described and the mounting of gratings necessary to avoid the intake of debris is discussed. Fish-passes are looked at and the effort required for maintenance is compared with that for other types of installations. An accident that occurred is analysed and the results of energy-efficiency measurements made on the installation are presented. The report is rounded off with an evaluation of the plant's performance and a review of future work to be done.

  1. Fishy Business: Response of Stream Fish Assemblages to Small Hydro-power Plant Induced Flow Alteration in the Western Ghats, Karnataka

    Science.gov (United States)

    Rao, S. T.; Krishnaswamy, J.; Bhalla, R. S.

    2017-12-01

    Alteration of natural flow regimes is considered as a major threat to freshwater fish assemblages as it disturbs the water quality and micro-habitat features of rivers. Small hydro-power (SHP), which is being promoted as a clean and green substitute for large hydro-power generation, alters the natural flow regime of head-water streams by flow diversion and regulation. The effects of altered flow regime on tropical stream fish assemblages, driven by seasonality induced perturbations to water quality and microhabitat parameters are largely understudied. My study examined the potential consequences of flow alteration by SHPs on fish assemblages in two tributaries of the west-flowing Yettinahole River which flows through the reserved forests of Sakleshpur in the Western Ghats of Karnataka. The flow in one of the tributaries followed natural flow regime while the other comprised three regimes: a near-natural flow regime above the dam, rapidly varying discharge below the dam and a dewatered regime caused by flow diversion. The study found that the altered flow regime differed from natural flow regime in terms of water quality, microhabitat heterogeneity and fish assemblage response, each indicative of the type of flow alteration. Fish assemblage in the natural flow regime was characterized by a higher catch per site, a strong association of endemic and trophic specialist species. The flow regime above the dam was found to mimic some components of the natural flow regime, both ecological and environmental. Non endemic, generalist and pool tolerant species were associated with the dewatered regime. There was a lack of strong species-regime association and an overall low catch per site for the flow regulated regime below the dam. This study highlights the consequences of altered flows on the composition of freshwater fish assemblages and portrays the potential of freshwater fish as indicators of the degree and extent of flow alteration. The study recommends the need for

  2. The effect of antenatal education in small classes on obstetric and psycho-social outcomes

    DEFF Research Database (Denmark)

    Brixval, Carina Sjöberg; Axelsen, Solveig Forberg; Lauemøller, Stine Glenstrup

    2015-01-01

    of small group antenatal education on obstetric and psycho-social outcomes. CONCLUSIONS: Insufficient evidence exists as to whether antenatal education in small classes is effective in regard to obstetric and psycho-social outcomes. We recommend updating this review following the emergence of well......, with participation of a small number of participants, may differ from the effect of other forms of antenatal education due to, for example, group dynamic. The objective of this systematic review is to assess the effects of antenatal education in small groups on obstetric as well as psycho-social outcomes. METHODS...

  3. MODELING AND STUDY OF HYDROELECTRIC GENERATING SETS OF SMALL HYDRO POWER PLANTS WITH FREQUENCY-CONTROLLED PERMANENT MAGNET SYNCHRONOUS GENERATORS

    Directory of Open Access Journals (Sweden)

    R. I. Mustafayev

    2016-01-01

    Full Text Available Currently, the hydroelectric generating sets of small HPPs with Pelton turbines employ as their generating units conventional synchronous generators with electromagnetic excitation. To deal with the torque pulsatile behaviour, they generally install a supplementary flywheel on the system shaft that levels the pulsations. The Pelton turbine power output is adjusted by the needle changing water flow in the nozzle, whose advancement modifies the nozzle area and eventually – the flow. They limit the needle full stroke time to 20–40 sec. since quick shutting the nozzle for swift water flow reduction may result in pressure surges. For quick power adjustment so-called deflectors are employed, whose task is retraction of water jets from the Pelton turbine buckets. Thus, the mechanical method of power output regulation requires agreement between the needle stroke inside the turbine nozzles and the deflector. The paper offers employing frequency-controlled synchronous machines with permanent magnets qua generating units for the hydroelectric generating sets of small HPPs with Pelton turbines. The developed computer model reveals that this provides a higher level of adjustability towards rapid-changing loads in the grid. Furthermore, this will replace the power output mechanical control involving the valuable deflector drive and the turbine nozzle needles with electrical revolution rate and power output regulation by a frequency converter located in the generator stator circuit. Via frequency start, the controllable synchronous machine ensures stable operation of the hydroelectric generating set with negligibly small amount of water (energy carrier. Finally, in complete absence of water, the frequency-relay start facilitates shifting the generator operation to the synchronous capacitor mode, which the system operating parameter fluctograms obtained through computer modeling prove. 

  4. Hydro-economic performances of streamflow withdrawal strategies: the case of small run-of-river power plants

    Science.gov (United States)

    Basso, Stefano; Lazzaro, Gianluca; Schirmer, Mario; Botter, Gianluca

    2014-05-01

    River flows withdrawals to supply small run-of-river hydropower plants have been increasing significantly in recent years - particularly in the Alpine area - as a consequence of public incentives aimed at enhancing energy production from renewable sources. This growth further raised the anthropic pressure in areas traditionally characterized by an intense exploitation of water resources, thereby triggering social conflicts among local communities, hydropower investors and public authorities. This brought to the attention of scientists and population the urgency for novel and quantitative tools for assessing the hydrologic impact of these type of plants, and trading between economic interests and ecologic concerns. In this contribution we propose an analytical framework that allows for the estimate of the streamflow availability for hydropower production and the selection of the run-of-river plant capacity, as well as the assessment of the related profitability and environmental impacts. The method highlights the key role of the streamflow variability in the design process, by showing the significance control of the coefficient of variation of daily flows on the duration of the optimal capacity of small run-of-river plants. Moreover, the analysis evidences a gap between energy and economic optimizations, which may result in the under-exploitation of the available hydropower potential at large scales. The disturbances to the natural flow regime produced between the intake and the outflow of run-of-river power plants are also estimated within the proposed framework. The altered hydrologic regime, described through the probability distribution and the correlation function of streamflows, is analytically expressed as a function of the natural regime for different management strategies. The deviations from pristine conditions of a set of hydrologic statistics are used, jointly with an economic index, to compare environmental and economic outcomes of alternative plant

  5. Hydrologic design methodologies for small-scale hydro at ungauged sites. Phase 2A, British Columbia. Summary report. Integrated method for power analysis (IMP)

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    Analysis of the feasibility of sites for small-scale hydroelectric power generation in British Columbia can be a difficult process in cases where gauged streamflow data are not available. This report outlines the capabilities of a package of computer programs, designed to aid the planner of small-scale hydro projects in evaluating the hydrology and energy potential of ungauged sites in that province. The programs were developed by using appropriate programming and hydrological research that had already been done, and taking advantage of experience already available from previous use of components of the package. As the province's mountainous terrain, with numerous microclimates, precluded use of methods of regional analysis based on regression or comparison with gauged streams, the package was developed on the basis of a conceptual model of physical processes on the land and in the atmosphere. The resulting package, the Integrated Method for Power Analysis, consists of five basic components: an atmospheric model of annual precipitation and one-in-ten-year 24-h maximum rainfall; a watershed model that will generate streamflow data based on information from the atmospheric model; a flood frequency analysis system that uses site-specific topographic information and information from the atmospheric model to generate a flood frequency curve; a hydroelectric power simulation program which determines the daily energy output for a run-of-river or reservoir storage site; and a graphics analysis package that provides direct visualization of atmospheric and streamflow data, and the results of watershed and power simulation modelling. 2 figs., 1 tab.

  6. New construction of the Leis-Gannibach small hydro power station in Vals, Switzerland; Elektrizitaetswerk der Gemeinde Vals, 7132 Vals. Neubau Kleinwasserkraftwerk 'Leis-Gannibach' - Schlussbericht / Vorprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Mittner, Ch.

    2010-03-15

    This report for the Swiss Federal Office of Energy (SFOE) presents a project concerning a new small hydro installation in Vals, Switzerland. A system in planning is to provide artificial snow at this ski resort using water from the Gannibach stream. The local utility in Vals intends to use this water during those periods when no artificial snow is needed to drive a small hydro power plant. The paper discusses the current situation, the hydrology of the catchment area and the potential that can be used. The legal and planning situation is examined and details of the project are provided, including water intake, pressurised piping, turbine, generator and control system. Finally, the financial viability of the project is examined.

  7. Pollution reduction technology program for small jet aircraft engines: Class T1

    Science.gov (United States)

    Bruce, T. W.; Davis, F. G.; Mongia, H. C.

    1977-01-01

    Small jet aircraft engines (EPA class T1, turbojet and turbofan engines of less than 35.6 kN thrust) were evaluated with the objective of attaining emissions reduction consistent with performance constraints. Configurations employing the technological advances were screened and developed through full scale rig testing. The most promising approaches in full-scale engine testing were evaluated.

  8. Antenatal small-class education versus auditorium-based lectures to promote positive transitioning to parenthood

    DEFF Research Database (Denmark)

    Koushede, Vibeke; Brixval, Carina Sjöberg; Thygesen, Lau Caspar

    2017-01-01

    Prospective parents widely use education to gain information about, e.g., labour and parenting skills. It is unknown if antenatal education in small classes is more beneficial for parenting stress and parenting alliance compared with other types of antenatal education. In the present randomised t...

  9. Gas, benefits and question marks. The Oklo reactors: 100 % natural. The Kyoto protocol: use it or lose it?. Small hydro power: a great leap forward. The energy mix of South Korea

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    This issue of Alternatives newsletter contains a main press-kit about natural gas economics worldwide and 4 articles dealing with the Oklo natural reactor, the Kyoto protocol, the small hydro-power in China, and the energy mix of South Korea: 1 - 'Gas benefits and question marks': The world's most widely distributed fossil fuel, natural gas is also the fastest-growing energy source of the past thirty years. Its position as the fuel of choice in the global energy mix is due in large part to its many domestic and industrial applications. 2 - 'The Oklo reactors: 100% natural': Another look at this extraordinary 2 billion year-old phenomenon in words and pictures: the nuclear fission reaction that created the natural reactors of Gabon. 3 - 'The Kyoto Protocol: use it or lose it?': Nearly eight years after its signature, the Kyoto Protocol is still hotly debated. Two experts give us their views: Spencer Abraham, former U.S. Secretary for Energy, and Jean-Charles Hourcade of CIRED, the international center for research on the environment and development. 4 - 'Small hydro power: a great leap forward': The Chinese government has responded to the need for rural electrification with an aid program for the country's poorest cantons. Enter the small hydro plant in northern Guangxi province. 5 - 'The energy mix of South Korea': Faced with continuing strong economic growth and energy demand, South Korea has multiplied its projects, from hydropower to tidal power to nuclear and even hydrogen in the longer term

  10. Coanda hydro intake screen testing and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Howarth, J.

    2001-07-01

    The objective of this project has been to evaluate the effectiveness, suitability and cost benefit of the Aquashear Coanda effect, maintenance free intake screen for use in small hydro system intakes. (author)

  11. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    McCredie, J.

    1984-01-01

    This report briefly describes Ontario Hydro's nuclear program, examining the design and construction status, and the future from Ontario Hydro's perspective. Ontario Hydro relies heavily on nuclear power. Nuclear fuel was responsible for approximately 34% of Ontario Hydro's energy production in 1983. The nuclear proportion was supplied by twelve operating units located: NPD, Douglas Point, Pickering A and B. It is expected that by approximately 1992, 65% of the total energy needs will be generated through nuclear power

  12. The use of computer simulations in whole-class versus small-group settings

    Science.gov (United States)

    Smetana, Lara Kathleen

    This study explored the use of computer simulations in a whole-class as compared to small-group setting. Specific consideration was given to the nature and impact of classroom conversations and interactions when computer simulations were incorporated into a high school chemistry course. This investigation fills a need for qualitative research that focuses on the social dimensions of actual classrooms. Participants included a novice chemistry teacher experienced in the use of educational technologies and two honors chemistry classes. The study was conducted in a rural school in the south-Atlantic United States at the end of the fall 2007 semester. The study took place during one instructional unit on atomic structure. Data collection allowed for triangulation of evidence from a variety of sources approximately 24 hours of video- and audio-taped classroom observations, supplemented with the researcher's field notes and analytic journal; miscellaneous classroom artifacts such as class notes, worksheets, and assignments; open-ended pre- and post-assessments; student exit interviews; teacher entrance, exit and informal interviews. Four web-based simulations were used, three of which were from the ExploreLearning collection. Assessments were analyzed using descriptive statistics and classroom observations, artifacts and interviews were analyzed using Erickson's (1986) guidelines for analytic induction. Conversational analysis was guided by methods outlined by Erickson (1982). Findings indicated (a) the teacher effectively incorporated simulations in both settings (b) students in both groups significantly improved their understanding of the chemistry concepts (c) there was no statistically significant difference between groups' achievement (d) there was more frequent exploratory talk in the whole-class group (e) there were more frequent and meaningful teacher-student interactions in the whole-class group (f) additional learning experiences not measured on the assessment

  13. The application of NISA II FEM package in seismic qualification of small class IE electric motors

    International Nuclear Information System (INIS)

    Fancev, T.; Saban, I.; Grgic, D.

    1995-01-01

    According to the IEEE standards 323/1974 and 344/1975, seismic qualification of class IE equipment is appropriate combination of test and analysis methods. Complex equipment and assemblies are usually tested through seismic testing. The analysis is recommended for simple equipment that can be easily modeled to correctly predict its response. This article deals with the application of NISA II FEM package in 3D FE modeling and mode shape calculations of small power low voltage electric motors. (author)

  14. Inquiry notice concerning the modalities of putting into place of the administration contribution of small hydroelectric generation in the resource plans of Hydro-Quebec

    International Nuclear Information System (INIS)

    Dumais, A.; Frayne, A.; Tanguay, F.

    1999-01-01

    On June 11, 1998 the Minister of State for Natural Resources in Quebec submitted to the Management of Energy in virtue of article 42 of the Law on the Management of Energy an inquiry notice concerning the modalities of putting into place the administration contribution of private hydroelectricity in the resource plan of Hydro-Quebec. The Minister of State requested of the Management to specify the size of a quoted part of reserving commoadministration, to indicate the period of time needed to space it out, and to give him notice of the buying price which would be socially acceptable for this form of energy. For the Minister, such a quoted part must be sufficiently important in order to release and support suppliers of goods and services. Also, the buying price offered by the Management must take into consideration the fiscal shares drawn from the exploitation of these installations which when set up in the public domain can be recovered without costs by the government at the end of the lease. Conforming to article 25 of the law, the Management held a public hearing consisting of three phases. In the first phase, all parties interested in succeeding in submitting their demands in conformity with chapters III and VII of the Proceedural Regulations were invited to make their demands and submit their observations according to the suggested time table, likewise making suggestions on debated questions. The management received twenty demands and four statements of intentions on the part of interested parties in relation to the sense of article 11 of the Proceedural Regulations. In the second phase, the interested parties submited according to the established time table their bills, their demands for information and particulars, and their responses to demands. This phase ended in May 1999. For the rest, arguments were entertained in a public forum in Montreal from June 1 to 22, 1999. The final arguments took place on July 12, 1999. The report contents include: introduction

  15. Design of a small nuclear reactor for extending the operational envelope of the Victoria Class Submarine

    International Nuclear Information System (INIS)

    Cole, C.J.P.

    2003-01-01

    The purpose of this research is to conceptually design a small, inherently safe, quasi-homogeneous nuclear reactor that will provide enough power to maintain the hotel load of the Victoria Class Submarine and extend her operational envelope. This research is in its early stages. The purpose of this paper is to outline the background of the research, present results found to date, and indicate the direction of the research over the next two years. The Canadian Forces has recently acquired four U.K. built Upholder Class submarines to replace the ageing Oberon Class submarines purchased in the early 1960's. The Upholders, like the Oberons, are diesel-electric powered. The Upholders were renamed the Victoria Class upon commissioning in Canada. Submarines are strategic military weapons that have several roles including: intelligence gathering, inflicting surprise attacks, controlling shipping lanes and covert operations. For each of these roles the submarine must remain undetected. To remain undetected, it is imperative that the submarine remains submerged. To remain submerged and continue to function, a submarine requires an air-independent power generation system, such as a nuclear reactor. (author)

  16. Ontario Hydro's DSP update

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Ontario Hydro's Demand/Supply Plan (DSP), the 25 year plan which was submitted in December 1989, is currently being reviewed by the Environmental Assessment Board (EAB). Since 1989 there have been several changes which have led Ontario Hydro to update the original Demand/Supply Plan. This information sheet gives a quick overview of what has changed and how Ontario Hydro is adapting to that change

  17. Some Aspects of Culture Teaching in Foreign Language and ESP Classes: Cultural Scripts and Small Talk

    Directory of Open Access Journals (Sweden)

    Ivona Baranovskaja

    2011-12-01

    Full Text Available The present paper deals with the problem of teaching culture in the foreign language classes at all levels of education. Cultural studies should not be separated from the language syllabus and foreign language learning should not be limited to formal learning of systems of sounds, words, and syntactic structures, but should also include learning the culture of the target language. Success in intercultural communication depends greatly on the understanding of a number of cultural features. The article emphasizes the importance of teaching and learning target culture, as well as introduces the analysis of cultural scripts and small talk in English, Russian and Polish languages. Understanding the cultural differences will benefit and facilitate cross-cultural communication under diverse circumstances. Thereby, this issue is relevant to foreign language and ESP classes focusing on the improvement of both students’ language and cultural skills.

  18. Numerical Integration of a Class of Singularly Perturbed Delay Differential Equations with Small Shift

    Directory of Open Access Journals (Sweden)

    Gemechis File

    2012-01-01

    Full Text Available We have presented a numerical integration method to solve a class of singularly perturbed delay differential equations with small shift. First, we have replaced the second-order singularly perturbed delay differential equation by an asymptotically equivalent first-order delay differential equation. Then, Simpson’s rule and linear interpolation are employed to get the three-term recurrence relation which is solved easily by discrete invariant imbedding algorithm. The method is demonstrated by implementing it on several linear and nonlinear model examples by taking various values for the delay parameter and the perturbation parameter .

  19. Antenatal education in small classes may increase childbirth self-efficacy

    DEFF Research Database (Denmark)

    Brixval, Carina S; Axelsen, Solveig F; Thygesen, Lau C

    2016-01-01

    Antenatal education in small classes may increase childbirth self-efficacy. In this randomised trial we assessed the effect of a structured antenatal programme versus auditorium-based lectures on childbirth self-efficacy measured by three single items. We found that women in the intervention group...... reported statistically significant higher levels of confidence in their ability to cope at home during labour compared to the control group. Likewise, the intervention had a positive effect on the women's confidence in own ability to handle the birth process....

  20. 75 FR 25844 - Class Deviation From FAR 52.219-7, Notice of Partial Small Business Set-Aside

    Science.gov (United States)

    2010-05-10

    ... Small Business Set-Aside AGENCY: Defense Logistics Agency, DoD. ACTION: Notice. SUMMARY: This is to...) regarding partial small business set-asides for Defense Logistics Agency (DLA), Defense Energy Support..., DESC is requesting a class deviation from FAR Clause 52.219-7, Notice of Partial Small Business Set...

  1. Hydro-energy

    International Nuclear Information System (INIS)

    Bacher, P.; Tardieu, B.

    2005-01-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  2. Analyze the factors effecting the development of hydro power projects in hydro rich regions of India

    Directory of Open Access Journals (Sweden)

    Ameesh Kumar Sharma

    2016-09-01

    Full Text Available Power is considered as the major back bone for all the nations throughout the world including India on the basis of which development of the country depends. If a country has the resources to generate the power at competitive price in that case the people of the country get the benefits in terms of improvement in their social and economical life. When we talk about India, various locations in the country where still there is no electricity people are living in dark without having the access of the modern technology. The total hydro power potential of India is 1, 50,000 MW out of this total hydro potential only 40,195 MW is exploited till 2014. More than 80% of the total hydro potential of the country is lying in the western Himalayan states (Jammu and Kashmir, Himachal Pradesh, Uttrakhand and Arunachal Pradesh. Small hydro projects are also playing a very important role in the modern world for the development of the remote areas which are not main grid connected specially in western Himalayan region of India. India has a total potential 19,749 MW of small hydro projects and of this total potential only 3990.9 MW harnessed till 2014. Ministry of new and renewable energy in India is also providing special incentives to hydro rich states of India. In this research article we are taken the case study of the small hydro projects in the western Himalayan region because theses states are having vast small hydro potential which is still needed to be harnessed. So, it is very important to identify the factors which are effecting the development of these small ventures especially in western Himalayan region in India.

  3. The 'Les iles' small-hydro power plant - Summary analysis; Analyse sommaire. Petite centrale hydroelectrique de Sombeval 'Les iles' - Rapport 2008

    Energy Technology Data Exchange (ETDEWEB)

    Hausmann, M.

    2008-01-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the River Suze in the Swiss Jura Mountains. The installation is to be made at the site of a small dam that previously provided water for a water-wheel-driven sawmill. A fish-pass at the site is also foreseen. The report presents details on the hydrological data for the river and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as are the regulation of water levels and the removal of river sediment. The electricity production expected is discussed, as is the economic viability of the project.

  4. Small-scale hydro power: from theory to practice - 15 international manufacturers implement MHyLab hydraulic profiles; Petite hydroelectricite: de la theorie a la pratique. 15 constucteurs internationaux ont recours aux profils hydrauliques de MHyLab

    Energy Technology Data Exchange (ETDEWEB)

    Denis, V. [MHyLab, Montcherand (Switzerland)

    2010-07-01

    This article takes a look at MHyLab, the Research and Development Laboratory for Small-scale Hydropower Turbines in Montcherand, Switzerland. Founded in 1996 this laboratory develops tailored hydraulic turbines for small-scale hydro power plants. Three types of turbines were modeled and tested on MHyLab test rig: Pelton turbines for hydraulic heads between 60 and 700 m; axial turbines of the Kaplan type for 1 to 30 m heads; diagonal turbines for 25 to 100 m heads. Up to 2010, 15 manufacturers from Switzerland, France, Germany, New Zealand and Japan have used hydraulic profiles developed by MHyLab. 70 turbines have been manufactured and installed, the total power of which is about 38 MW. Their total annual production is estimated to 189 GWh. The illustrated article describes the methodology followed by MHyLab and some of its realisations in Switzerland and Jordan.

  5. Hydro-Quebec's buyback tariff

    International Nuclear Information System (INIS)

    Richard, J.C.

    1992-01-01

    Hydro-Quebec had an installed electric generation capacity of 25,682 MW in 1990, of which 23,927 MW was hydraulic. Of the 26 thermal power plants, 22 are in remote communities on islands or in the north part of the province. The utility's development plan predicts an annual growth in demand of 2.6% to reach ca 200 TWh in 2006; this demand would be reduced to ca 180 TWh by energy efficiency measures. To increase capacity, Hydro-Quebec can utilize the hydro generation potential of its large rivers, of which 18,000 MW is economically viable, and its small rivers. Of the 10,000 MW theoretical potential of the latter, a large fraction cannot be economically developed under existing conditions. The utility has a policy to purchase energy as a function of the price of fossil fuel. For wind energy, this price was 4.22 cents/kWh in 1991; this price will be increased annually according to the inflation index. In its isolated sites such as the Magdalen Islands, current costs of diesel-generated electricity are at least 5.5 cents/kWh. There are possibilities for installing wind plants in isolated regions but their automatic control systems need to be improved for achieving a larger utilization factor relative to diesel generation and their cost needs to be reduced. 1 tab

  6. Hydro-climatology

    DEFF Research Database (Denmark)

    The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal with under......The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal...... considered. The interdisciplinary approach reveals information and perspective that go beyond the study of cli ate and hydro gy alone...

  7. Discovery and computer aided potency optimization of a novel class of small molecule CXCR4 antagonists.

    Directory of Open Access Journals (Sweden)

    Victoria Vinader

    Full Text Available Amongst the chemokine signalling axes involved in cancer, chemokine CXCL12 acting on chemokine receptor CXCR4 is particularly significant since it orchestrates migration of cancer cells in a tissue-specific metastatic process. High CXCR4 tumour expression is associated with poor prognosis of lung, brain, CNS, blood and breast cancers. We have identified a new class of small molecule CXCR4 antagonists based on the use of computational modelling studies in concert with experimental determination of in vitro activity against CXCL12-induced intracellular calcium mobilisation, proliferation and chemotaxis. Molecular modelling proved to be a useful tool in rationalising our observed potencies, as well as informing the direction of the synthetic efforts aimed at producing more potent compounds.

  8. Using Small Parallel Corpora to Develop Collocation-Centred Activities in Specialized Translation Classes

    Directory of Open Access Journals (Sweden)

    Postolea Sorina

    2016-12-01

    Full Text Available The research devoted to special languages as well as the activities carried out in specialized translation classes tend to focus primarily on one-word or multi-word terminological units. However, a very important part in the making of specialist registers and texts is played by specialised collocations, i.e. relatively stable word combinations that do not designate concepts but are nevertheless of frequent use in a given field of activity. This is why helping students acquire competences relative to the identification and processing of collocations should become an important objective in specialised translation classes. An easily accessible and dependable resource that may be successfully used to this purpose is represented by corpora and corpus analysis tools, whose usefulness in translator training has been highlighted by numerous studies. This article proposes a series of practical, task-based activities-developed with the help of a small-size parallel corpus of specialised texts-that aim to raise the translation trainees′ awareness of the collocations present in specialised texts and to provide suggestions about their processing in translation.

  9. The Design of a Templated C++ Small Vector Class for Numerical Computing

    Science.gov (United States)

    Moran, Patrick J.

    2000-01-01

    We describe the design and implementation of a templated C++ class for vectors. The vector class is templated both for vector length and vector component type; the vector length is fixed at template instantiation time. The vector implementation is such that for a vector of N components of type T, the total number of bytes required by the vector is equal to N * size of (T), where size of is the built-in C operator. The property of having a size no bigger than that required by the components themselves is key in many numerical computing applications, where one may allocate very large arrays of small, fixed-length vectors. In addition to the design trade-offs motivating our fixed-length vector design choice, we review some of the C++ template features essential to an efficient, succinct implementation. In particular, we highlight some of the standard C++ features, such as partial template specialization, that are not supported by all compilers currently. This report provides an inventory listing the relevant support currently provided by some key compilers, as well as test code one can use to verify compiler capabilities.

  10. Social class, ethnicity and other risk factors for small for gestational age and preterm delivery in the Netherlands

    NARCIS (Netherlands)

    Verkerk, P.H.; Zaadstra, B.M.; Reerink, J.D.; Herngreen, W.P.; Verloove-Vanhorick, S.P.

    1994-01-01

    Social class and ethnicity are important risk factors for small-for-gestational-age and preterm delivery in many countries. This study was performed to assess whether this is also the case in the Netherlands, a country with a high level of social security, relatively small income differences and

  11. 40 CFR Table 4 to Subpart Jjj of... - Class II Emission Limits for Existing Small Municipal Waste Combustion Unitsa

    Science.gov (United States)

    2010-07-01

    ... Small Municipal Waste Combustion Unitsa 4 Table 4 to Subpart JJJ of Part 62 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Pt. 62, Subpt. JJJ, Table 4 Table 4 to Subpart JJJ of Part 62—Class II Emission Limits for Existing Small Municipal Waste Combustion Unitsa ER31JA03.009...

  12. 40 CFR Table 2 to Subpart Jjj of... - Class I Emission Limits for Existing Small Municipal Waste Combustion Limits

    Science.gov (United States)

    2010-07-01

    ... Small Municipal Waste Combustion Limits 2 Table 2 to Subpart JJJ of Part 62 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Pt. 62, Subpt. JJJ, Table 2 Table 2 to Subpart JJJ of Part 62—Class I Emission Limits for Existing Small Municipal Waste Combustion Limits ER31JA03.006...

  13. Retrofitting the small-scale hydro power plant 'La Chocolatiere' in Echandens-Bussigny, Switzerland; Rehabilitation de la petite centrale de la Chocolatiere (Echandens - Bussigny)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-05-15

    This report for the Swiss Federal Office of Energy (SFOE) is a project study for the retrofitting of a small-scale hydro power plant installed on the River Venoge, between the communities of Echandens and Bussigny, western Switzerland. At this site, hydro power is used since the 18{sup th} century. A permanent license to use at most 3 m{sup 3}/s is available. The study concludes that the maximum flow rate of 6 m{sup 3}/s would be more advantageous, implying a 35 cm higher dam on the river. Two turbines could then be installed, leading to the maximum electric power of 177 kW and the power production of 727,000 kWh/y. From the detailed inventory of the retrofitting work and the installation of the new turbines - including a new fish ladder according to the legislation in force - the authors conclude that electricity could be generated at a cost amounting to about CHF 0.24/kWh. It is recommended to request the modification of the water use license in order to be able to use up to 6 m{sup 3}/s.

  14. Determination of the class and isoform selectivity of small-molecule histone deacetylase inhibitors

    DEFF Research Database (Denmark)

    Khan, N.; Jeffers, M.; Kumar, S.

    2008-01-01

    The human HDAC (histone deacetylase) family, a well-validated anticancer target, plays a key role in the control of gene expression through regulation of transcription. While HDACs can be subdivided into three main classes, the class I, class II and class III HDACs (sirtuins), it is presently...

  15. Hydro under shock

    International Nuclear Information System (INIS)

    Maffezzini, I.; Pineault, E.; Poirier, M.

    1997-01-01

    A discussion of the potential privatisation of Hydro-Quebec, and of the motivation to do so, was presented. The creation of Hydro-Quebec resulted from the nationalization in 1963 of all major electricity producers in the province of Quebec. Since its inception, Hydro-Quebec has gone through many episodes of restructuring but none more far reaching in extent, or in consequences, than the present one. The current deregulation of the electrical industry in Quebec, and the potential commercialization of Hydro-Quebec is considered to be a natural and inevitable result of the current global trend towards competition in the power industry and the demand for greater consumer choice. 1 tab

  16. Identification of a new class of small molecules that efficiently reactivate latent Epstein-Barr virus

    Science.gov (United States)

    Tikhmyanova, Nadezhda; Schultz, David C.; Lee, Theresa; Salvino, Joseph M.; Lieberman, Paul M.

    2014-01-01

    Epstein-Barr Virus (EBV) persists as a latent infection in many lymphoid and epithelial malignancies, including Burkitt's lymphomas, nasopharyngeal carcinomas, and gastric carcinomas. Current chemotherapeutic treatments of EBV-positive cancers include broad- spectrum cytotoxic drugs that ignore the EBV-positive status of tumors. An alternative strategy, referred to as oncolytic therapy, utilizes drugs that stimulate reactivation of latent EBV to enhance the selective killing of EBV positive tumors, especially in combination with existing inhibitors of herpesvirus lytic replication, like Ganciclovir (GCV). At present, no small molecule, including histone deacetylase (HDAC) inhibitors, have proven safe or effective in clinical trials for treatment of EBV positive cancers. Aiming to identify new chemical entities that induce EBV lytic cycle, we have developed a robust high throughput cell-based assay to screen 66,840 small molecule compounds. Five structurally related tetrahydrocarboline derivatives were identified, two of which had EC50 measurements in the range of 150-170 nM. We show that these compounds reactivate EBV lytic markers ZTA and EA-D in all EBV-positive cell lines we have tested independent of the type of latency. The compounds reactivate a higher percentage of latently infected cells than HDAC inhibitors or phorbol esters in many cell types. The most active compounds showed low toxicity to EBV-negative cells, but were highly effective at selective cell killing of EBV-positive cells when combined with GCV. We conclude that we have identified a class of small molecule compounds that are highly effective at reactivating latent EBV infection in a variety of cell types, and show promise for lytic therapy in combination with GCV. PMID:24028149

  17. Multi-Criteria GIS Methodology Focused on the Location of Optimal Places for Small Hydro Power Via Hydrological and Geostatistic Aplications; Metodologia SIG Multicriterio Enfocada a la Localizacion de Enclaves Optimos para Centrales de Minihidroelectricas mediante Aplicaciones Hidrologicas y Geoestadisticas

    Energy Technology Data Exchange (ETDEWEB)

    Paz, C de la

    2013-02-01

    The main objective of this research is the development of a location methodology for sitting optimization of small hydro power (SHP) centrals. In order of achieve this goal, a Multi-Criteria Evaluation (MCE) methodology implemented through the use of tools in a GIS environment: Spatial Analysis, Geostatistic Analysis, and Hydrology have been developed. This methodology includes two different models based on the same MCE process. The substantial difference of both models is in the input data and the tools applied to estimate the energy resource and the principal factor of the methodology (caudal or accumulated flow). The first model is generated from caudal data obtained in the study area (El Bierzo), and the second one from pluviometric data and Digital Terrain Model (DTM). Both models include viability maps with greater ability areas to locate SHP facilities. As an additional objective, the study allows contrasting the results of the two developed models to evaluate their similarity. (Author)

  18. Feasibility study for the installation of a small hydro electric power plant; Etude de faisabilite. Petite centrale hydro-electrique au lieu dit 'Sous les Roches' a Sonceboz

    Energy Technology Data Exchange (ETDEWEB)

    Tissot, N. [MHyLab, Mini-Hydraulics Laboratory, Montcherand (Switzerland); Hausmann, H. [Hans Hausmann, Bevilard (Switzerland)

    2003-07-01

    This report for the Swiss Federal Office of Energy presents a technical, economical and ecological analysis of the feasibility of a small hydroelectric power plant at Sonceboz, in the Swiss Jura mountains. The power of the planed plant would typically be 500 kW for a water head of about 10 m. The study shows that, compared to one single turbine, a pair of Kaplan type turbines would be operational over a larger range of the river's water flow rate. This solution would be a little bit more costly but offer more flexibility for maintenance. Two maximum water flow rates are considered, 4.5 and 6 m{sup 3}/s respectively. According to the economical study, done with current electric kWh prices, both configurations are viable while the largest flow rate leads to a larger profit. The report is rounded up by a sensitivity analysis considering variations in annual power generation, electro-mechanical and construction cost as well as turbine efficiency. It indicates that this last factor could be crucial for the overall profitability. [French] Ce rapport est le resultat detaille de l'analyse technico-economique et ecologique de faisabilite de la realisation d'une petite centrale hydroelectrique basse chute qui pourrait exploiter une denivellation d'environ 10 m pour une puissance de l'ordre de 500 kW pres de Sonceboz dans le Jura suisse. L'etude montre que le couplage de deux turbines Kaplan offrirait une possibilite de fonctionnement sur une plus grande plage de flux ainsi qu'une plus grande flexibilite de maintenance, ceci pour un cout legerement superieur a l'option a une seule turbine. Les debits de 4.5 et 6 m{sup 3}/s sont consideres. L'etude economique montre que le debit de 6 m{sup 3}/s est plus rentable au prix de vente actuel du kWh. L'article se termine par une analyse de sensibilite sur les incertitudes concernant la production annuelle, les prix de l'electromecanique et du genie civil et le rendement des

  19. Provincial hydro expansions

    Energy Technology Data Exchange (ETDEWEB)

    Froschauer, K J

    1993-01-01

    A study of the development of five provincial hydroelectric utilities in Canada indicates that power companies and the state invited manufacturers to use hydroelectricity and natural resources in order to diversify provincial economies. These hydro expansions also show that utilities and government designed hydro projects to serve continental requirements; serving both objectives became problematic. It is argued that when the Canadian state and firms such as utilities use hydro expansions to serve both continentalism and industrialization, then at best they foster dependent industrialization and staple processing. At worst, they overbuild the infrastructure to generate provincial surplus energy for continental, rather than national, integration. Hydro developments became subject to state intervention in Canada mainly through the failures of private utilities to provide power for the less-lucrative industrial markets within provincial subregions. Although the state and utilities invited foreign firms to manufacture hydro equipment within the provinces and others to use electricity to diversify production beyond resource processing, such a diversification did not occur. Since 1962, ca 80% of industrial energy was used to semi-process wood-derived products, chemicals, and metals. The idea for a national power network became undermined by interprovincial political-economic factors and since 1963, the federal national/continential power policy prevailed. 187 refs., 6 figs., 52 tabs.

  20. Ontario Hydro decontamination experience

    Energy Technology Data Exchange (ETDEWEB)

    Lacy, C S; Patterson, R W; Upton, M S [Chemistry and Metallurgy Department, Central Production Services, Ontario Hydro, ON (Canada)

    1991-04-01

    Ontario Hydro currently operates 18 nuclear electric generating units of the CANDU design with a net capacity of 12,402 MW(e). An additional 1,762 MW(e) is under construction. The operation of these facilities has underlined the need to have decontamination capability both to reduce radiation fields, as well as to control and reduce contamination during component maintenance. This paper presents Ontario Hydro decontamination experience in two key areas - full heat transport decontamination to reduce system radiation fields, and component decontamination to reduce loose contamination particularly as practised in maintenance and decontamination centres. (author)

  1. Ontario Hydro decontamination experience

    International Nuclear Information System (INIS)

    Lacy, C.S.; Patterson, R.W.; Upton, M.S.

    1991-01-01

    Ontario Hydro currently operates 18 nuclear electric generating units of the CANDU design with a net capacity of 12,402 MW(e). An additional 1,762 MW(e) is under construction. The operation of these facilities has underlined the need to have decontamination capability both to reduce radiation fields, as well as to control and reduce contamination during component maintenance. This paper presents Ontario Hydro decontamination experience in two key areas - full heat transport decontamination to reduce system radiation fields, and component decontamination to reduce loose contamination particularly as practised in maintenance and decontamination centres. (author)

  2. A Novel Class of Small Molecule Agonists with Preference for Human over Mouse TLR4 Activation.

    Directory of Open Access Journals (Sweden)

    Jason D Marshall

    Full Text Available The best-characterized Toll-like receptor 4 (TLR4 ligands are lipopolysaccharide (LPS and its chemically modified and detoxified variant, monophosphoryl lipid A (MPL. Although both molecules are active for human TLR4, they demonstrate a potency preference for mouse TLR4 based on data from transfected cell lines and primary cells of both species. After a high throughput screening process of small molecule libraries, we have discovered a new class of TLR4 agonist with a species preference profile differing from MPL. Products of the 4-component Ugi synthesis reaction were demonstrated to potently trigger human TLR4-transfected HEK cells but not mouse TLR4, although inclusion of the human MD2 with mTLR4 was able to partially recover activity. Co-expression of CD14 was not required for optimal activity of Ugi compounds on transfected cells, as it is for LPS. The species preference profile for the panel of Ugi compounds was found to be strongly active for human and cynomolgus monkey primary cells, with reduced but still substantial activity for most Ugi compounds on guinea pig cells. Mouse, rat, rabbit, ferret, and cotton rat cells displayed little or no activity when exposed to Ugi compounds. However, engineering the human versions of TLR4 and MD2 to be expressed in mTLR4/MD2 deficient mice allowed for robust activity by Ugi compounds both in vitro and in vivo. These findings extend the range of compounds available for development as agonists of TLR4 and identify novel molecules which reverse the TLR4 triggering preference of MPL for mouse TLR4 over human TLR4. Such compounds may be amenable to formulation as more potent human-specific TLR4L-based adjuvants than typical MPL-based adjuvants.

  3. The Flipped Classroom for Teaching Organic Chemistry in Small Classes: Is It Effective?

    Science.gov (United States)

    Fautch, Jessica M.

    2015-01-01

    The flipped classroom is a pedagogical approach that moves course content from the classroom to homework, and uses class time for engaging activities and instructor-guided problem solving. The course content in a sophomore level Organic Chemistry I course was assigned as homework using video lectures, followed by a short online quiz. In class,…

  4. Experience of pico/micro hydro based power generation

    Energy Technology Data Exchange (ETDEWEB)

    Murthy, S.S. [Indian Inst. of Technology, Delhi, New Delhi (India). Dept. of Electrical Engineering

    2010-07-01

    Although India has approximately 150,000 megawatts of hydro potential, only a small portion is tapped. There is also significant untapped hydro potential in many developing countries such as Nepal, Bhutan, Vietnam, Indonesia and regions in South America and Africa. Small-scale hydroelectric power systems with capacities of up to a few megawatts are eco-friendly and sustainable. They can be classified based on unit sizes as pico (u pto 10 kilowatts), micro (10-100 kilowatts) and mini (100 kilowatts to a few megawatts) hydro systems. Mini hydro systems are always grid connected while micro can be either grid connected or off grid. Pico is always off grid. In India, there are thousands of favorable sites in this range that should be tapped for distributed power generation to electrify local communities. This need is reflected by the global emphasis on distributed power generation as well as the Government of India's policy to promote this type of power generation. A working stand alone pico-hydro power generating system has been successfully installed in 5 sites in Karnataka. The purpose of the project was to demonstrate the technical, managerial and economic feasibility of setting up small hydro projects in remote hilly areas of Karnataka, India and its positive environmental impact. The presentation discussed the site selection criteria; installed sites of pico hydro; system description; parts of the system; the electric load controller; types of electronic load controllers; and a description of the unit and control scheme. tabs., figs.

  5. Identification of small non-coding RNA classes expressed in swine whole blood during HP-PRRSV infection.

    Science.gov (United States)

    Fleming, Damarius S; Miller, Laura C

    2018-04-01

    It has been established that reduced susceptibility to porcine reproductive and respiratory syndrome virus (PRRSV) has a genetic component. This genetic component may take the form of small non-coding RNAs (sncRNA), which are molecules that function as regulators of gene expression. Various sncRNAs have emerged as having an important role in the immune system in humans. The study uses transcriptomic read counts to profile the type and quantity of both well and lesser characterized sncRNAs, such as microRNAs and small nucleolar RNAs to identify and quantify the classes of sncRNA expressed in whole blood between healthy and highly pathogenic PRRSV-infected pigs. Our results returned evidence on nine classes of sncRNA, four of which were consistently statistically significantly different based on Fisher's Exact Test, that can be detected and possibly interrogated for their effect on host dysregulation during PRRSV infections. Published by Elsevier Inc.

  6. Hydro turbines: An introduction

    International Nuclear Information System (INIS)

    Gordon, J.L.

    1993-01-01

    The various types of hydraulic turbines currently used in hydroelectric power plants are described. The descriptions are intended for use by non-engineers who are concerned with fish passage and fish mortality at a hydro power facility. Terminology used in the hydro industry is explained. Since the extent of cavitation is one of the factors affecting mortality rates of fish passing through hydraulic turbines, an equation is introduced which measures the extent of cavitation likely to be experienced in a turbine. An example of how the cavitation index can be calculated is provided for two typical power plants. The relation between certain parameters of power plant operation and the extent of cavitation, and therefore of fish mortality, is illustrated. 2 refs., 14 figs

  7. The hydro digest

    Energy Technology Data Exchange (ETDEWEB)

    Scheil, Hermann [Itaipu Mondig, Power Generation Group (KWU), Siemens AG, Erlangen (Germany)

    2000-12-01

    Digest WK is an analysis and diagnostics system for turbine generators in large hydroelectric plant: it was developed from the Digest system which has been used in steam turbine plants for many years. The system is in use at the world's biggest hydro plant in Itaipu Binacional between Paraguay and Brazil. The system is described under the sub-headings of (a) monitoring concept; (b) the Digest WK system; (c) vibration monitoring; (d) generator temperature analysis and (e) outlook.

  8. Hydro-power

    International Nuclear Information System (INIS)

    Piro, P.

    2010-01-01

    On average the hydro-power sector produces 12% of the electrical power in France. A quarter of this production might pass to another operator than EDF because the end of some grants is nearing (2012 for 12 installations). In France the power of rivers belongs to the state that gives operators grants to harness it. The allowance lasts 75 years usually but for installations below 4.5 MW a permanent and definitive grant is allowed. Most installations are ancient and their investment have been paid off since a long, so hydro-power is the most profitable renewable energy in France. A lot of bidders are expected. Each bid will be assessed on 3 criteria: -) the global energy efficiency of the waterfall, -) a balanced management of the water resource, and -) an economic and financial offer to the state. The balance between the different uses of water is getting more delicate to reach and this renewal of grants will be an opportunity for the state to impose a better preservation of the environment. In July 2008, the French government announced a program for the re launching of the hydro-power, this program has been reduced and now only 3000 GWh supplementary are expected by 2020. (A.C.)

  9. Retrofitting the small-scale hydro power plant of Chable, municipality of Vionnaz, Switzerland - Feasibility study; Rehabilitation de la petite centrale de Chable, Commune de Vionnaz (VS) - Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-15

    A small-scale 200 kW hydro power plant has been installed 1988 on the drinking water supply system of the municipality of Vionnaz, Switzerland. It uses the elevation difference of 700 m between the springs in the mountains and the village in the Rhone river valley. A full refurbishment is suggested to improve the system efficiency and increase the water volume delivered to the turbine. The current status of the system has been evaluated. The replacement of the turbine is proposed. The water supply network of the mountain resort of Torgon located on the territory of Vionnaz should be connected to the existing reservoir ahead of the penstock. The penstock itself should be partly or totally replaced. In this way the yearly power production of 1,430 MWh could be increased by up to a factor of 2 at the attractive cost of CHF 0.06 to 0.09 per kWh, depending on the implemented variant.

  10. Retrofitting of the small hydro electric scheme 'Moulin d'en Bas' in Cronay, Switzerland - Preliminary project; Rehabilitation du Moulin d'en Bas, commune de Cronay. Etude d'avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-09-15

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) is a feasibility study for the retrofitting of the small hydro electric scheme 'Moulin d'en Bas' located in Cronay on the Mentue river, Switzerland. Two variants are considered. In the first one the existing scheme uses a 4.72 m water fall and its power amounts to about 25 kW. A 4-blades Kaplan turbine is foreseen to generate 160,000 kWh/y. In the second variant, weir and penstock have to be adapted in order to take advantage of the full 6.74 m water fall indicated in the water-use concession granted in 1952. A new fish pass has to be built as well. The resulting electric power is in this case 80 kW and the power generation by the turbo group 353,000 kWh/y, about 60% of which in the wintertime. Electricity production cost is estimated to be 0.282 CHF/kWh in the second variant.

  11. MHC class I epitope binding prediction trained on small data sets

    DEFF Research Database (Denmark)

    Lundegaard, Claus; Nielsen, Morten; Lamberth, K.

    2004-01-01

    The identification of potential T-cell epitopes is important for development of new human or vetenary vaccines, both considering single protein/subunit vaccines, and for epitope/peptide vaccines as such. The highly diverse MHC class I alleles bind very different peptides, and accurate binding pre...... in situations where only very limited data are available for training....

  12. Nonrobustness of the Carryover Effects of Small Classes in Project STAR

    Science.gov (United States)

    Sohn, Kitae

    2015-01-01

    Background: Class size reduction (CSR) is an enduring school reform undertaken in an effort to improve academic achievement and has been widely encouraged in the United States. Supporters of CSR often cite the positive contemporaneous and carryover effects of Project STAR. Much has been discussed regarding the robustness of the contemporaneous…

  13. Habitat-dependent interactions between two size-classes of juvenile steelhead in a small stream

    Science.gov (United States)

    Bret C. Harvey; Rodney J. Nakamoto

    1997-01-01

    Abstract - The presence of small steelhead (Oncorhynchus mykiss; averaging 55 mm fork length) influenced the growth of larger juvenile steelhead (90 mm fork length) during a 6-week experiment conducted in North Fork Caspar Creek, California, in summer 1994. In fenced replicate deep stream sections in this small stream, growth of the larger steelhead was greater in...

  14. Small chromosomal regions position themselves autonomously according to their chromatin class.

    Science.gov (United States)

    van de Werken, Harmen J G; Haan, Josien C; Feodorova, Yana; Bijos, Dominika; Weuts, An; Theunis, Koen; Holwerda, Sjoerd J B; Meuleman, Wouter; Pagie, Ludo; Thanisch, Katharina; Kumar, Parveen; Leonhardt, Heinrich; Marynen, Peter; van Steensel, Bas; Voet, Thierry; de Laat, Wouter; Solovei, Irina; Joffe, Boris

    2017-06-01

    The spatial arrangement of chromatin is linked to the regulation of nuclear processes. One striking aspect of nuclear organization is the spatial segregation of heterochromatic and euchromatic domains. The mechanisms of this chromatin segregation are still poorly understood. In this work, we investigated the link between the primary genomic sequence and chromatin domains. We analyzed the spatial intranuclear arrangement of a human artificial chromosome (HAC) in a xenospecific mouse background in comparison to an orthologous region of native mouse chromosome. The two orthologous regions include segments that can be assigned to three major chromatin classes according to their gene abundance and repeat repertoire: (1) gene-rich and SINE-rich euchromatin; (2) gene-poor and LINE/LTR-rich heterochromatin; and (3) gene-depleted and satellite DNA-containing constitutive heterochromatin. We show, using fluorescence in situ hybridization (FISH) and 4C-seq technologies, that chromatin segments ranging from 0.6 to 3 Mb cluster with segments of the same chromatin class. As a consequence, the chromatin segments acquire corresponding positions in the nucleus irrespective of their chromosomal context, thereby strongly suggesting that this is their autonomous property. Interactions with the nuclear lamina, although largely retained in the HAC, reveal less autonomy. Taken together, our results suggest that building of a functional nucleus is largely a self-organizing process based on mutual recognition of chromosome segments belonging to the major chromatin classes. © 2017 van de Werken et al.; Published by Cold Spring Harbor Laboratory Press.

  15. The effect of antenatal education in small classes on obstetric and psycho-social outcomes

    DEFF Research Database (Denmark)

    Brixval, Carina Sjöberg; Axelsen, Solveig Forberg; Andersen, Stig Krøger

    2014-01-01

    The aims of antenatal education contain both outcomes related to pregnancy, birth and parenthood. Both content and methods of antenatal education have changed over time without evidence of effects on relevant outcomes. The effect of antenatal education in groups, with participation of a small num......-analysis aims to assess the effects of antenatal education in small groups on obstetric as well as psycho-social outcomes....

  16. Hydrologic design methodologies for small-scale hydro at ungauged sites. Phase 2A, British Columbia. Primer for Integrated Method for Power Analysis (IMP)

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    This report provides a user's manual for the Integrated Method for Power Analysis (IMP) series of programs, developed to aid in evaluating small-scale hydroelectric power sites in British Columbia. The primary objective of IMP is to address the problem posed by hydroelectric development at sites completely lacking in streamflow records. The province's mountainous terrain, with numerous microclimates, precluded methods of regional analysis based on regression or comparisons with gauged streams; instead, a conceptual model of physical processes on the land and in the atmosphere was used as a basis for developing IMP. The IMP package consists of five basic components: an atmospheric model of annual precipitation and 1-in-10-year 24-h maximum rainfall; a watershed model that will generate a daily series of streamflow data; a flood frequency analysis system that uses site-specific topographical information and information from the atmospheric model to generate the flood frequency curve; a hydroelectric power simulation program which determines the daily energy output for a run-of-river or reservoir storage site; and a graphics analysis package which provides direct visualization of atmospheric and streamflow data, and the results of watershed and power simulation modelling. Within each component of the program, the program requirements and capabilities are discussed. A series of sample screens are shown, illustrating the use of the IMP package for a particular simulation. 18 figs., 2 tabs.

  17. Challenging hydro-hegemony

    DEFF Research Database (Denmark)

    Wessels, Josepha Ivanka

    2015-01-01

    Bank. Both case studies show that control over water resources and supply provides political power over others at local level. Yet non-violent resistance can be observed in these border areas. In border areas between Israel, Syria and Palestine, control over access and water supply plays an important...... role in the ability of Israel to exercise hegemonic power in daily hydro-politics, which in the long term is detrimental for the people and the environment and disrupts the hydrological balance in the entire Jordan River basin....

  18. The near boiling reactor: design of a small nuclear reactor for extending the operational envelope of the Victoria Class Submarine

    International Nuclear Information System (INIS)

    Cole, C.; Bonin, H.

    2005-01-01

    A small, inherently safe nuclear reactor that will provide enough power to maintain the hotel load of the Victoria Class Submarine and extend her operational envelope, has been conceptually designed. The final reactor concept, named the Near Boiling (NB) Reactor, employs TRISO fuel particles in Zirconium cladded fuel rods. The reactor is light water moderated and cooled. The core life is specifically designed to coincide with the refit cycle of the Victoria Class Submarine. The reactor employs a simple and reliable control and shut down system that requires little intervention on the part of the submarine's crew. Also, a kinetic model is developed that demonstrates the inherent safety features of the reactor during several accident scenarios. (author)

  19. The near boiling reactor: design of a small nuclear reactor for extending the operational envelope of the Victoria Class Submarine

    Energy Technology Data Exchange (ETDEWEB)

    Cole, C.; Bonin, H. [Royal Military College of Canada, Dept. of Chemistry and Chemical Engineering, Kingston, Ontario (Canada)]. E-mail: chris.cole@rmc.ca; bonin-h@rmc.ca

    2005-07-01

    A small, inherently safe nuclear reactor that will provide enough power to maintain the hotel load of the Victoria Class Submarine and extend her operational envelope, has been conceptually designed. The final reactor concept, named the Near Boiling (NB) Reactor, employs TRISO fuel particles in Zirconium cladded fuel rods. The reactor is light water moderated and cooled. The core life is specifically designed to coincide with the refit cycle of the Victoria Class Submarine. The reactor employs a simple and reliable control and shut down system that requires little intervention on the part of the submarine's crew. Also, a kinetic model is developed that demonstrates the inherent safety features of the reactor during several accident scenarios. (author)

  20. Assessment of potential for small hydro/solar power integration in a mountainous, data sparse region: the role of hydrological prediction accuracy

    Science.gov (United States)

    Borga, Marco; Francois, Baptiste; Creutin, Jean-Dominique; Hingray, Benoit; Zoccatelli, Davide; Tardivo, Gianmarco

    2015-04-01

    In many parts of the world, integration of small hydropower and solar/wind energy sources along river systems is examined as a way to meet pressing renewable energy targets. Depending on the space and time scales considered, hydrometeorological variability may synchronize or desynchronize solar/wind, runoff and the demand opening the possibility to use their complementarity to smooth the intermittency of each individual energy source. Rivers also provide important ecosystem services, including the provision of high quality downstream water supply and the maintenance of in-stream habitats. With future supply and demand of water resources both impacted by environmental change, a good understanding of the potential for the integration among hydropower and solar/wind energy sources in often sparsely gauged catchments is important. In such cases, where complex data-demanding models may be inappropriate, there is a need for simple conceptual modelling approaches that can still capture the main features of runoff generation and artificial regulation processes. In this work we focus on run-of-the-river and solar-power interaction assessment. In order to catch the three key cycles of the load fluctuation - daily, weekly and seasonal, the time step used in the study is the hourly resolution. We examine the performance of a conceptual hydrological model which includes facilities to model dam regulation and diversions and hydrological modules to account for the effect of glaciarised catchments. The model is applied to catchments of the heavily regulated Upper Adige river system (6900 km2), Eastern Italian Alps, which has a long history of hydropower generation. The model is used to characterize and predict the natural flow regime, assess the regulation impacts, and simulate co-fluctuations between run-of- the-river and solar power. The results demonstrates that the simple, conceptual modelling approach developed here can capture the main hydrological and regulation processes

  1. An Inverse MOOC Model: Small Virtual Field Geology Classes with Many Teachers (Invited)

    Science.gov (United States)

    De Paor, D. G.; Whitmeyer, S. J.; Bentley, C.

    2013-12-01

    In the Massive Open Online Courses (MOOCs) mode of instruction, one or a small group of collaborating instructors lecture online to a large (often extremely large) number of students. We are experimenting with an inverse concept: an online classroom in which a small group of collaborating students are taught by dozens of collaborating instructors. This experiment is part of a new NSF TUES Type 3 project titled 'Google Earth for Onsite and Distance Education (GEODE).' Among the goals of the project are the development of an online course called the 'Grand Tour.' We are inviting dozens of colleagues to record virtual field trips (VFTs) and upload them to Google Earth. Students enrolled in the course will be assigned to a small group and tasked with a research project--for example to write a report on foreland thrust belts. They will select a small subset of available VFTs to follow and will be scaffolded by virtual specimens, emergent cross sections, analytical simulations (virtual tricorders), and a game style environment. Instant feedback based on auto-logging will enable adaptive learning. The design is suited to both onsite and distance education and will facilitate access to iconic geologic sites around the world to persons with mobility constraints. We invite input from the community to help guide the design phase of this project. Prototypes of the above-listed learning resources have already been developed and are freely available at http://www.DigitalPlanet.org.

  2. Ontario Hydro annual report 1986

    Energy Technology Data Exchange (ETDEWEB)

    1987-04-01

    Ontario Hydro`s annual report of the financial position and activities for the year 1986 consists of their financial highlights; corporate profile; customer service and satisfaction; message from Chairman; message from President; 1986 in review; financial section; management report; five-year summary of financial statistics; and comparative statistics.

  3. Hydro-energy; Energie hydraulique

    Energy Technology Data Exchange (ETDEWEB)

    Bacher, P. [Electricite de France (EDF), 75 - Paris (France); Tardieu, B. [Coyne et Bellier, 92 - Gennevilliers (France)

    2005-07-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  4. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Jackson, H.A.; Woodhead, L.W.; Fanjoy, G.R.

    1984-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations for the workers and the public

  5. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Bartholomew, R.W.; Woodhead, L.W.; Horton, E.P.; Nichols, M.J.; Daly, I.N.

    1987-01-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on worker and public safety, operating performance and costs, and reliability of system components

  6. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  7. A semi-urban case study of small scale variability of rainfall and run-off, with C- and X-band radars and the fully distributed hydrological model Multi-Hydro

    Science.gov (United States)

    Alves de Souza, Bianca; da Silva Rocha Paz, Igor; Gires, Auguste; Tchiguirinskaia, Ioulia; Schertzer, Daniel

    2016-04-01

    The complexity of urban hydrology results both from that of urban systems and the extreme rainfall variability. The latter can display strongly localised rain cells that can be extremely damaging when hitting vulnerable parts of urban systems. This paper investigates this complexity on a semi-urban sub-catchment - located in Massy (South of Paris, France) - of the Bievre river, which is known for its frequent flashfloods. Advanced geo-processing techniques were used to find the ideal pixel size for this 6.326km2 basin. C-band and X-band radar data are multifractally downscaled at various resolutions and input to the fully distributed hydrological model Multi-Hydro. The latter has been developed at Ecole des Ponts ParisTech. It integrates validated modules dealing with surface flow, saturated and unsaturated surface flow, and sewer flow. The C-band radar is located in Trappes, approx. 21km East of the catchment, is operated by Méteo-France and has a resolution of 1km x 1km x 5min. The X-band radar operated by Ecole des Ponts Paris Tech on its campus has a resolution of 125m x 125m x 3.4min. The performed multifractal downscaling enables both the generation of large ensemble realizations and easy change of resolution (e.g. down to 10 m in the present study). This in turn allows a detailed analysis of the impacts of small scale variability and the required resolution to obtain accurate simulations, therefore predictions. This will be shown on two rainy episodes over the chosen sub-catchment of the Bievre river.

  8. Hydro-Quebec : positioning and strategic planning

    International Nuclear Information System (INIS)

    Lanoue, R.

    1998-01-01

    Hydro-Quebec's corporate concerns for 1998-2002 were highlighted. The Corporation's strategic plan envisages that within the next decade, the utility will boost sales by 25 per cent with an investment of $13.2 billion in new generation projects. The electric utility plans to build on past experience and maintain its electricity rates and service quality. Sustaining environmental quality while developing into a world class enterprise remains a major objective of the utility. Research and development will also continue to be an integral part of the utility's operations. Tabs., figs

  9. 40 CFR Table 4 to Subpart Bbbb of... - Model Rule-Class II Emission Limits for Existing Small Municipal Waste Combustion Unit a

    Science.gov (United States)

    2010-07-01

    ... Existing Small Municipal Waste Combustion Unit a 4 Table 4 to Subpart BBBB of Part 60 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... Part 60—Model Rule—Class II Emission Limits for Existing Small Municipal Waste Combustion Unit a For...

  10. Adaptive Fuzzy Robust Control for a Class of Nonlinear Systems via Small Gain Theorem

    Directory of Open Access Journals (Sweden)

    Xingjian Wang

    2013-01-01

    Full Text Available Practical nonlinear systems can usually be represented by partly linearizable models with unknown nonlinearities and external disturbances. Based on this consideration, we propose a novel adaptive fuzzy robust control (AFRC algorithm for such systems. The AFRC effectively combines techniques of adaptive control and fuzzy control, and it improves the performance by retaining the advantages of both methods. The linearizable part will be linearly parameterized with unknown but constant parameters, and the discontinuous-projection-based adaptive control law is used to compensate these parts. The Takagi-Sugeno fuzzy logic systems are used to approximate unknown nonlinearities. Robust control law ensures the robustness of closed-loop control system. A systematic design procedure of the AFRC algorithm by combining the backstepping technique and small-gain approach is presented. Then the closed-loop stability is studied by using small gain theorem, and the result indicates that the closed-loop system is semiglobally uniformly ultimately bounded.

  11. Negotiating the Inquiry Question: A Comparison of Whole Class and Small Group Strategies in Grade Five Science Classrooms

    Science.gov (United States)

    Cavagnetto, Andy R.; Hand, Brian; Norton-Meier, Lori

    2011-03-01

    The purpose of this study is to examine the effect of two strategies for negotiating the question for exploration during science inquiry on student achievement and teachers' perceptions. The study is set in the context of the Science Writing Heuristic. The first strategy (small group) consisted of each group of four students negotiating a question for inquiry with the teacher while the second strategy (whole class) consisted of the entire class negotiating a single question for inquiry with the teacher. The study utilized a mixed-method approach. A quasi-experimental repeated measures design was used to determine the effect of strategy on student achievement and semi-structured teacher interviews were used to probe the question of teacher perceptions of the two strategies. Teacher observations were conducted using the Reformed Teaching Observation Protocol (RTOP) to check for variation in implementation of the two strategies. Iowa Test of Basic Skills Science (ITBSS) (2005 and 2006) and teacher/researcher developed unit exams (pre and post) were used as student achievement measures. No statistically significant differences were found among students in the two treatment groups on the ITBSS or unit exams. RTOP observations suggest that teacher implementation was consistent across the two treatment strategies. Teachers disclosed personal preferences for the two strategies, indicating the whole class treatment was easier to manage (at least at the beginning of the school year) as students gained experience with science inquiry and the associated increased responsibility. Possible mechanisms linking the two strategies, negotiated questions, and student outcomes are discussed.

  12. Nano-Scale Sample Acquisition Systems for Small Class Exploration Spacecraft

    Science.gov (United States)

    Paulsen, G.

    2015-12-01

    The paradigm for space exploration is changing. Large and expensive missions are very rare and the space community is turning to smaller, lighter, and less expensive missions that could still perform great exploration. These missions are also within reach of commercial companies such as the Google Lunar X Prize teams that develop small scale lunar missions. Recent commercial endeavors such as "Planet Labs inc." and Sky Box Imaging, inc. show that there are new benefits and business models associated with miniaturization of space hardware. The Nano-Scale Sample Acquisition System includes NanoDrill for capture of small rock cores and PlanetVac for capture of surface regolith. These two systems are part of the ongoing effort to develop "Micro Sampling" systems for deployment by the small spacecraft with limited payload capacities. The ideal applications include prospecting missions to the Moon and Asteroids. The MicroDrill is a rotary-percussive coring drill that captures cores 7 mm in diameter and up to 2 cm long. The drill weighs less than 1 kg and can capture a core from a 40 MPa strength rock within a few minutes, with less than 10 Watt power and less than 10 Newton of preload. The PlanetVac is a pneumatic based regolith acquisition system that can capture surface sample in touch-and-go maneuver. These sampling systems were integrated within the footpads of commercial quadcopter for testing. As such, they could also be used by geologists on Earth to explore difficult to get to locations.

  13. Small-Town Touch, Big-City Innovation, World-Class Aspirations.

    Science.gov (United States)

    Forgey, Warren L; Dye, Tammy

    2015-01-01

    The healthcare system in the United States is at a critical crossroads. Costs are rising, measures of healthcare quality are well below those of other industrialized nations, and public and regulatory scrutiny is increasing. Healthcare leaders are searching for more effective, efficient, and sustainable operational models to address the mounting challenges they face. We at Schneck Medical Center in Seymour, Indiana, chose the Baldrige Excellence Framework to guide our organization, to accelerate our performance improvement journey, and to create sustainable results in our core services. The Baldrige Framework uses a systematic approach to innovation and improvement in seven key management areas. These seven areas were leadership; strategic planning; customer focus; measurement, analysis, and knowl- edge management; workforce focus; operations focus; and results (Baldrige Performance Excellence Program 2015). In this article, we describe our Baldrige journey. We address why we chose to use the Framework, how we engaged our key stakeholders, and what challenges we faced and lessons we learned along the way. In addition, we detail how Schneck's focus on performance improvement has resulted in significant returns to the organization. Throughout the article, we refer to our pursuit of performance excellence as a "journey," and it is indeed just that. Quality improvement takes time, because it is a transformation with many steps. World-class performance is attainable only with years of work and constant refinement.

  14. Hydro Tasmania - renewable energy drivers, action and plans

    International Nuclear Information System (INIS)

    Gill, R.; Andrews, H.

    2005-01-01

    In Tasmania, the island state of Australia, the generator, Hydro Tasmania, is pushing technical, environmental and business boundaries in its plans to integrate a relatively high proportion (up to 20 percent) of large wind generators into its current complex mix of large and small hydropower plants. Its plans include projects to increase the efficiency of its older hydropower equipment as it prepares to supply much needed peaking capacity to the market in southern Australia via the groundbreaking Basslink undersea cable, which is due for completion in November 2005. Taken as a package these developments are creating a globally significant reference site for renewable energy systems. The paper will describe what is happening, and more importantly what is underpinning the developments, including: the harnessing of Tasmania's world-class wind resource, where recently constructed 1.75 MW wind turbines are achieving capacity factors of over 45 percent - some of the best productivity in the world today; the application of leading environmental science measures to ensure the sustainability of both the new wind farm developments and the transformation of the hydropower system to meet peak capacity demands; the relevance of the existing large hydropower storages that can operate in synergy with the wind resource; the contribution of Australia's renewable energy certificate scheme, which is effectively doubling the value of new renewable energy developments compared with existing generation sources; the application of the latest technology in hydropower turbines, combined with power system expertise from the world's leading manufacturers, to increase the efficiency of older hydropower generators, thereby more effectively harnessing the existing environmental footprint; and the transformation of Hydro Tasmania's business into a significant supplier and trader of premium value peak energy into the sophisticated Australian National Electricity Market. (author)

  15. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    Jackson, H.A.

    1982-06-01

    In 1981 Ontario Hydro generated over 100 billion KWh of electrical energy. Approximately one third of this was from nuclear units. There are ten CANDU units (5 250 MW) currently in operation, and another twelve (8 600 MW) are under construction. The presently committed nuclear expansion program is estimated to involve expenditures of 16 billion dollars over the next 10 years. About 10 000 people are employed in the nuclear design and construction program. All projects are generally on schedule, with the stations coming into service during the following time periods: Pickering B, 1983-85; Bruce B, 1984-87; Darlington, 1988-90. The status of each project is reviewed. Planning is underway for some retubing projects, as early as 1985 for Pickering A

  16. Setting the question for inquiry: The effects of whole class vs small group on student achievement in elementary science

    Science.gov (United States)

    Cavagnetto, Andy Roy

    This study was conducted to determine the effects of two different student-centered approaches to setting the question for inquiry. The first approach (whole class) consisted of students setting a single question for inquiry after which students worked in small groups during an investigation phase of the activity with all groups exploring the same question. The second approach (small group) consisted of each group of students setting a question resulting in numerous questions being explored per class. A mixed method quasi-experimental design was utilized. Two grade five teachers from a small rural school district in the Midwestern United States participated, each teaching two sections of science (approximately 25 students per section). Results indicate three major findings. Instructional approach (whole class vs. small group) did not effect student achievement in science or language arts. Observational data indicated the actions and skills teachers utilized to implement the approaches were similar. Specifically, the pedagogical skills of dialogical interaction (which was found to be influenced by teacher level of control of learning and teacher content knowledge) and effective rather than efficient use of time were identified as key factors in teachers' progression toward a student-centered, teacher-managed instructional approach. Unit exams along with qualitative and quantitative teacher observation data indicated that these factors do have an impact on student achievement. Specifically increased dialogical interaction in the forms of greater student voice, and increased cognitive demands placed on students by embedding and emphasizing science argument within the student inquiry corresponded to positive gains in student achievement. Additionally, teacher's perception of student abilities was also found to influence professional growth. Finally, allowing students to set the questions for inquiry and design the experiments impact the classroom environment as teacher

  17. Municipal water powers small hydro in California

    Energy Technology Data Exchange (ETDEWEB)

    Townsend, C.W.

    1985-07-01

    The city council of San Luis Obispo, California approved a scheme in 1984 to install a hydropower plant into an existing water distribution network. The Stenner Canyon project is under construction on the site of an abandoned water treatment plant. A 750 kW Pelton turbine will be fed via a 20 km pipeline from the Salimas Reservoir. A remote telemetry system will control turbine output. The primary objectives are to generate extra power for the area and provide additional revenue for the city. Computer simulation helped hydraulics engineers design the system. Tax-exempt industrial development bonds will finance the $1.5 million project. 2 figures.

  18. Small hydro schemes in Turtmanntal, Switzerland

    International Nuclear Information System (INIS)

    2008-01-01

    This two-part report for the Swiss Federal Office of Energy (SFOE) presents several variants and two preliminary projects with respect to schemes for the use of hydropower in the Turtmanntal valley in the Swiss Alps. The various possible sites for the power stations both on the left and right-hand sides of the main valley are described. Technical details and prognoses for costs and energy production are discussed for all these variants. In the second part of the report, preliminary projects for hydropower installations on the Braendji and Piji streams are presented. Costs and economic viability are discussed and time-scales for the realisation are examined.

  19. Small group gender ratios impact biology class performance and peer evaluations.

    Science.gov (United States)

    Sullivan, Lauren L; Ballen, Cissy J; Cotner, Sehoya

    2018-01-01

    Women are underrepresented in science, technology, engineering, and mathematics (STEM) disciplines. Evidence suggests the microclimate of the classroom is an important factor influencing female course grades and interest, which encourages retention of women in STEM fields. Here, we test whether the gender composition of small (8-9 person) learning groups impacts course performance, sense of social belonging, and intragroup peer evaluations of intellectual contributions. Across two undergraduate active learning courses in introductory biology, we manipulated the classroom microclimate by varying the gender ratios of learning groups, ranging from 0% female to 100% female. We found that as the percent of women in groups increased, so did overall course performance for all students, regardless of gender. Additionally, women assigned higher peer- evaluations in groups with more women than groups with less women. Our work demonstrates an added benefit of the retention of women in STEM: increased performance for all, and positive peer perceptions for women.

  20. Demystification and localization in the adoption of micro-hydro technology : Insights from India

    NARCIS (Netherlands)

    Höffken, J.I.

    2016-01-01

    The phrase ‘small is beautiful’ holds true for the micro-hydro plants discussed in this article. Micro-hydro plants can convert the energy of falling water into electricity. In India, access to electricity cannot be taken for granted, especially in rural areas, which do not yet have grid extension

  1. HydroViz: evaluation of a web-based tool for improving hydrology education

    Science.gov (United States)

    Habib, E.; Ma, Y.; Williams, D.; Sharif, H.; Hossain, F.

    2012-02-01

    HydroViz is a web-based, student-centered, highly visual educational tool designed to support active learning in the field of Engineering Hydrology. The development of HydroViz is informed by recent advances in hydrologic data, numerical simulations, visualization and web-based technologies. An evaluation study was conducted to determine the effectiveness of HydroViz, to examine the buy-in of the program, and to identify project components that need to be improved. A total of 182 students from seven freshmen and junior-/senior-level undergraduate classes in three universities participated in the study over the course of two semesters (spring 2010 and fall 2010). Data sources included homework assignments, online surveys, and informal interviews with students. Descriptive statistics were calculated for homework and the survey. Qualitative analysis of students' comments and informal interview notes were also conducted to identify ideas and patterns. HydroViz was effective in facilitating students' learning and understanding of hydrologic concepts and increasing related skills. Students had positive perceptions of various features of HydroViz and they believe that HydroViz fits well in the curriculum. The experience with HydroViz was somewhat effective in raising freshmen civil engineering students' interest in hydrology. In general, HydroViz tend to be more effective with students in junior- or senior-level classes than students in freshmen classes. There does not seem to be obvious differences between different universities. Students identified some issues that can be addressed to improve HydroViz. Future adaptation and expansion studies are under planning to scale-up the application and utility of HydroViz into various hydrology and water-resource engineering curriculum settings.

  2. Taylor Hydro plant goes live

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The 12.75 MW Taylor Hydroelectric Plant in Magrath, Alberta, synchronized its generator with the Alberta Power Grid and began production in April 2000. The plant is located on Government of Alberta irrigation works and is owned by Canadian Hydro Developers. During the irrigation season the plant will generate approximately 40 million kilowatt hours of zero-emission 'green' power for consumption, enough to power 5,000 homes for a year. The Taylor plant is a joint venture with EPCOR Power Development Corporation, a wholly-owned subsidiary of EPCOR Inc., the City of Edmonton utility. Canadian Hydro Developers also owns a 19 MW wind plant and a 6 MW gas plant in Alberta and five other 'run of river' hydro plants in Ontario and British Columbia. The company is committed to the concept of low-impact power generation; its ownership of wind run-of-river hydro and gas-fired facilities is proof of that commitment

  3. Class I and II Small Heat Shock Proteins Together with HSP101 Protect Protein Translation Factors during Heat Stress.

    Science.gov (United States)

    McLoughlin, Fionn; Basha, Eman; Fowler, Mary E; Kim, Minsoo; Bordowitz, Juliana; Katiyar-Agarwal, Surekha; Vierling, Elizabeth

    2016-10-01

    The ubiquitous small heat shock proteins (sHSPs) are well documented to act in vitro as molecular chaperones to prevent the irreversible aggregation of heat-sensitive proteins. However, the in vivo activities of sHSPs remain unclear. To investigate the two most abundant classes of plant cytosolic sHSPs (class I [CI] and class II [CII]), RNA interference (RNAi) and overexpression lines were created in Arabidopsis (Arabidopsis thaliana) and shown to have reduced and enhanced tolerance, respectively, to extreme heat stress. Affinity purification of CI and CII sHSPs from heat-stressed seedlings recovered eukaryotic translation elongation factor (eEF) 1B (α-, β-, and γ-subunits) and eukaryotic translation initiation factor 4A (three isoforms), although the association with CI sHSPs was stronger and additional proteins involved in translation were recovered with CI sHSPs. eEF1B subunits became partially insoluble during heat stress and, in the CI and CII RNAi lines, showed reduced recovery to the soluble cell fraction after heat stress, which was also dependent on HSP101. Furthermore, after heat stress, CI sHSPs showed increased retention in the insoluble fraction in the CII RNAi line and vice versa. Immunolocalization revealed that both CI and CII sHSPs were present in cytosolic foci, some of which colocalized with HSP101 and with eEF1Bγ and eEF1Bβ. Thus, CI and CII sHSPs have both unique and overlapping functions and act either directly or indirectly to protect specific translation factors in cytosolic stress granules. © 2016 American Society of Plant Biologists. All Rights Reserved.

  4. Applications of neural network prediction of conformational states for small peptides from spectra and of fold classes

    DEFF Research Database (Denmark)

    Bohr, Henrik; Røgen, Peter; Jalkanen, Karl J.

    2001-01-01

    but already at this stage they could be compared with reasonable agreements to experiments. The neural networks are shown to be good in distinguishing the different conformers of the small alanine peptides. especially when in the gas phase. Also the task of predicting protein fold-classes, defined from line...... to construct vibrational spectra for each of the conformational states with low energy. From the spectra, neural networks could be trained to distinguish between the various states and thus be able to generate a larger set of relevant structures and their relation to secondary structures of the peptides....... The calculations were done both with solvent atoms (up to ten water molecules) and without, and hence the neural networks could be used to monitor the influence of the solvent on hydrogen bond formation. The calculations at this stage only involved very short peptide fragments of a few alanine amino acids...

  5. Implementing ILDs and Assessment in Small-enrollment, Calculus-based Physics Classes -- Lessons, Observations and Open Questions

    Science.gov (United States)

    Mason-McCaffrey, Deborah

    2011-04-01

    At Salem State, we offer a Physics minor, but most of our teaching load is support courses for other science majors and a lab sequence which satisfies the University's core education requirement. In three years of using assessments and ILDs in small-enrollment calculus-based Physics classes, there has been a significant implementation learning curve, there are encouraging results, a few cautions, and still some open questions to report. ILDs can be highly effective teaching tools. They do require significant advance preparation as well as a safe environment for student participation. Motivating students to do their best on assessment pre- and post-tests can also be difficult. Strategies for motivating assessment performance, experiments using clickers to encourage participation in ILDs, and modifying and developing home-grown ILDs are discussed.

  6. Center manifolds for a class of degenerate evolution equations and existence of small-amplitude kinetic shocks

    Science.gov (United States)

    Pogan, Alin; Zumbrun, Kevin

    2018-06-01

    We construct center manifolds for a class of degenerate evolution equations including the steady Boltzmann equation and related kinetic models, establishing in the process existence and behavior of small-amplitude kinetic shock and boundary layers. Notably, for Boltzmann's equation, we show that elements of the center manifold decay in velocity at near-Maxwellian rate, in accord with the formal Chapman-Enskog picture of near-equilibrium flow as evolution along the manifold of Maxwellian states, or Grad moment approximation via Hermite polynomials in velocity. Our analysis is from a classical dynamical systems point of view, with a number of interesting modifications to accommodate ill-posedness of the underlying evolution equation.

  7. Hydro-Quebec looks south

    International Nuclear Information System (INIS)

    Ross, P.

    1997-01-01

    The recent introduction of Hydro-Quebec, the Canadian utility, into selling cheap electric power in the United States (US) deregulated power market is described, following applications to the US Federal Energy Regulatory Commission. As its prices are so much cheaper than its US competitors, it is expected that the company will soon have many willing customers across the USA. Hydro-Quebec will remain a publicly owned utility, but has experienced restructuring in order to meet this new competitive challenge. (UK)

  8. Optimal Classes of Chemotherapeutic Agents Sensitized by Specific Small-Molecule Inhibitors of Akt In Vitro and In Vivo

    Directory of Open Access Journals (Sweden)

    Yan Shi

    2005-11-01

    Full Text Available Akt is a serine/threonine kinase that transduces survival signals from survival/growth factors. Deregulation and signal imbalance in cancer cells make them prone to apoptosis. Upregulation or activation of Akt to aid the survival of cancer cells is a common theme in human malignancies. We have developed small-molecule Akt inhibitors that are potent and specific. These Akt inhibitors can inhibit Akt activity and block phosphorylation by Akt on multiple downstream targets in cells. Synergy in apoptosis induction was observed when Akt inhibitors were combined with doxorubicin or camptothecin. Akt inhibitor-induced enhancement of topoisomerase inhibitor cytotoxicity was also evident in long-term cell survival assay. Synergy with paclitaxel in apoptosis induction was evident in cells pretreated with paclitaxel, and enhancement of tumor delay by paclitaxel was demonstrated through cotreatment with Akt inhibitor Compound A (A-443654. Combination with other classes of chemotherapeutic agents did not yield any enhancement of cytotoxicity. These findings provide important guidance in selecting appropriate classes of chemotherapeutic agents for combination with Akt inhibitors in cancer treatment.

  9. Renewal of the small hydro power plant 'La Foulaz' on the river Orbe in Vallorbe, Switzerland; Rehabilitation de la petite centrale hydroelectrique de la Foulaz sur l'Orbe a Vallorbe. Etude d'avant projet - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Chenal, R.; Denis, V. [La Foulaz Energies SA, Vallorbe (Switzerland); Chuat, O. [RWB Eau et Environnement SA, Cernier (Switzerland)

    2009-08-15

    For now nearly four centuries, hydro power is used on the site named 'La Foulaz' on the river Orbe in the Vallorbe municipal territory. The existing small-scale hydro power plant is under neglect since 1970, although it enjoys a permanent water usage concession of 4.2 m{sup 3}/s. Since June 2008 the company 'La Foulaz Energie SA' owns the site and the water concession and is planning the renewal of the hydro power plant. The plan is to replace the existing permanent water flow rate usage concession by a higher water flow rate usage one of reasonable but limited duration. Reliable hydrological data are available from the Swiss Federal Administration as well as from the electricity utility 'Romande Energie SA' that operates the 'La Dernier' hydro power plant located up-stream. According to these data the design flow rate of 10 m{sup 3}/s has been selected for the new 'La Foulaz' plant. The available water head for the turbine is in the range 1.46 to 3-00 m, depending on the flow rate in the river Orbe. The average annual power production is estimated to 708,000 kWh. The peak electrical power would be 164 kW. With a cost recovery time of 25 years the production cost is estimated to 25 Swiss cents/kWh. This just enables to balance the budget. (author)

  10. Hydro-mechanical processes

    Energy Technology Data Exchange (ETDEWEB)

    Laouafa, F.; Kazmierczak, J.B. [Institut National de l' Environnement Industriel et des Risques (INERIS), Parc Technologique ALATA, 60 - Verneuil en Halatte (France); Armand, G. [Agence Nationale pour la Gestion des Dechets Radioactifs, Lab. de Souterrain de Meuse/Haute-Marne, 55 - Bure (France); Vaunat, J. [Catalonia UPC- Technical Univ., Barcelona (Spain); Jobmann, M.; Polster, M. [DBETEC- DBE Technology GmbH, Peine (Germany); Su, K.; Lebon, P.; Plas, F.; Armand, G.; Abou-Chakra Guery, A.; Cormery, F.; Shao, J.F.; Kondo, D. [ANDRA - Agence Nationale pour la Gestion des Dechets Radioactifs, 92 - Chatenay Malabry (France); Souley, M. [Institut National de l' Environnement Industriel et des Risques (INERIS), 54 - Nancy (France); Coll, C.; Charlier, R.; Collin, F.; Gerard, P. [Liege Univ., Dept. ArGEnCo (Belgium); Xiang Ling, Li [ESV EURIDICE, SCK.CEN, Belgian Nuclear Research Centre, Mol (Belgium); Collin, F. [Liege Univ., Charge de Recherches FNRS (Belgium); Pellet, F.L.; Fabre, G. [University Joseph Fourier, Laboratory 3S-R, 38 - Grenoble (France); Garcia-Sineriz, J.L.; Rey, M. [AITEMIN - Asociacion para la Investigacion y Desarrollo Industrial de los Recursos Naturales, Madrid (Spain); Mayor, J.C. [ENRESA - Empresa Nacional des Residuos Radioactivos, Madrid (Spain); Castellanos, E.; Romero, E.; Lloret, A.; Gens, A. [Catalunya Univ. Politecnica, UPC (Spain); Villar, M.V. [CIEMAT - Centro de Investigaciones Energeticas, Medioambientales y Tecnologicas, Madrid (Spain); Chambon, R. [Laboratoire 3S, UJF-INPG-CNRS, 38 - Grenoble (France); Czaikowski, O.; Lux, K.H. [Clausthal Univ. of Technology, Professorship for Waste Disposal and Geomechanics, Clausthal-Zellerfeld (Germany); Van Geet, M.; Bastiaens, W.; Volckaert, G.; Weetjens, E.; Sillen, X. [SCK-CEN, Waste and Disposal dept., Mol (Belgium); ONDRAF/NIRAS, Brussel (Belgium); Imbert, Ch. [CEA Saclay, Dept. de Physico-Chimie (DPC/SCCME/LECBA), 91 - Gif sur Yvette (France)] [and others

    2007-07-01

    This session gathers 13 articles dealing with: three-dimensional and time stepping modelling of the whole Meuse/Haute-Marne ANDRA URL (F. Laouafa, J.B. Kazmierczak, G. Armand, J. Vaunat, M. Jobmann, M. Polster); a constitutive model for a deep argillaceous rock using Hoek-Brown criteria (K. Su, C. Chavant, M. Souley); the long term behaviour of the Boom clay: influence of viscosity on the pore pressure distribution (C. Coll, R. Charlier, X.L. Li, F. Collin); the microstructural changes induced by viscoplastic deformations in argillaceous rocks (F.L. Pellet, G. Fabre, K. Su, P. Lebon); the engineered barrier experiment at Mont Terri rock laboratory (J.L. Garcia-Sineriz, M. Rey, J.C. Mayor); the chemical influence on the Hydro-Mechanical behaviour of high-density FEBEX bentonite (E. Castellanos, M.V. Villar, E. Romero, A. Lloret, A. Gens); the influence of water exchanges on the gallery convergence (P. Gerard, R. Charlier, R. Chambon, F. Collin); a new method for ageing resistant storage of argillaceous rock samples to achieve reproducible experimental results even after long intermediate storage times (O. Czaikowski, K.H. Lux); the installation and evaluation of a large-scale in-situ shaft seal experiment in Boom clay the RESEAL project M. Van Geet, W. Bastiaens, G. Volckaert, E. Weetjens, X. Sillen, A. Gens, M.V. Villar, Ch. Imbert, M. Filippi, F. Plas); the hydro-Mechanical response of the Callovo-Oxfordian mud-stone around a deep vertical drift (J. Vaunat, B. Garitte, A. Gens, K. Su, G. Armand); the sensitivity of total stress to changes in externally applied water pressure in KBS-3 buffer bentonite (J.F. Harrington, D.J. Birchall, P. Sellin); the comparison of the poro-elastic behavior of Meuse/Haute Marne and Tournemire argillites: effect of loading and saturation states (E. Bemer, A. Noiret, F. Homand, A. Rejeb); and the multi-scale modelling of the argillites mechanical behaviour (A. Abou-Chakra Guery, F. Cormery, K. Su, J.F. Shao, D. Kondo)

  11. The effect of antenatal education in small classes on obstetric and psycho-social outcomes - a systematic review.

    Science.gov (United States)

    Brixval, Carina Sjöberg; Axelsen, Solveig Forberg; Lauemøller, Stine Glenstrup; Andersen, Stig Krøger; Due, Pernille; Koushede, Vibeke

    2015-02-28

    The aims of antenatal education are broad and encompass outcomes related to pregnancy, birth, and parenthood. Both form and content of antenatal education have changed over time without evidence of effects on relevant outcomes. The effect of antenatal education in groups, with participation of a small number of participants, may differ from the effect of other forms of antenatal education due to, for example, group dynamic. The objective of this systematic review is to assess the effects of antenatal education in small groups on obstetric as well as psycho-social outcomes. Bibliographic databases (Medline, EMBASE, CENTRAL, CINAHL, Web of Science, and PsycINFO) were searched. We included randomized and quasi-randomized trials irrespective of language, publication year, publication type, and publication status. Only trials carried out in the Western world were considered in this review. Studies were assessed for bias using the Cochrane risk of bias tool. Results are presented as structured summaries of the included trials and as forest plots. We identified 5,708 records. Of these, 17 studies met inclusion criteria. Studies varied greatly in content of the experimental and control condition. All outcomes were only reported in a single or a few trials, leading to limited or uncertain confidence in effect estimates. Given the heterogeneity in interventions and outcomes and also the high risk of bias of studies, we are unable to draw definitive conclusions as to the impact of small group antenatal education on obstetric and psycho-social outcomes. Insufficient evidence exists as to whether antenatal education in small classes is effective in regard to obstetric and psycho-social outcomes. We recommend updating this review following the emergence of well-conducted randomized controlled trials with a low risk of bias. PROSPERO CRD42013004319.

  12. What Research Says about Small Classes and Their Effects. In Pursuit of Better Schools: What Research Says.

    Science.gov (United States)

    Biddle, Bruce J.; Berliner, David C.

    Interest in class size is widespread today. Debates often take place about "ideal" class size. Controversial efforts to reduce class size have appeared at both the federal level and in various states around the nation. This paper reviews research on class size and discusses findings, how these findings can be explained, and policy implications.…

  13. Hydro-Quebec's Strategic Plan 2002-2006 : summary

    International Nuclear Information System (INIS)

    2001-01-01

    A corporate profile of Hydro-Quebec was presented and the strategy that the utility will adopt for the 2002-2006 period was summarized. The utility plans to maintain its service quality and sustain environmental quality while developing a world class enterprise. Quebec has adopted a heritage pool giving Quebec consumers access to a maximum of 165 TWh of electricity per year at an average commodity rate of 2.79 cents per kilowatt-hour, the lowest rate for such a large amount of energy in North America. Above that volume, supply for the Quebec market will be ensured through competitive bidding, leading to the signing of supply contracts based on market price. Hydro-Quebec's strategy reflects the business opportunities open to Hydro-Quebec given its traditional activities in the province, the restructuring of North American energy markets, and the emergence of Quebec as a major energy hub. The business opportunities come from the fact that demand for electricity in Quebec is growing and from the opening of markets close to Quebec. Investment outlook in hydroelectric generation and transmission also appears to be profitable. It is likely that investment will be needed to build infrastructure. Hydro-Quebec is also working with its qualified workforce to develop a world-class international activity base. tabs., figs

  14. Detailed feasibility study of a small-hydro power plant in Zerni on the municipal drinking water supply; Etude detaillee de faisabilite pour l'installation d'une petite centrale sur l'adduction d'eau potable de Zerni - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Reul, B. [MHyLab, Montcherand (Switzerland); Perruchoud, A. [SierreEnergie SA, Sierre (Switzerland)

    2009-02-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the municipal drinking water supply of the city of Sierre, Switzerland. The installation is to be made at the site of a new reservoir in Zerni. The report presents details on the hydrological data and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as are the applicable water regulations. The electricity production expected is discussed, as is the economic viability of the project.

  15. Deconstructing hydro: the BC electricity sector in this decade

    International Nuclear Information System (INIS)

    Jaccard, M.

    2001-01-01

    This paper provided speculation regarding the world-wide trend to deregulate electric utilities with particular focus on power deregulation in British Columbia. The four main issues facing electricity reform in British Columbia are to determine if publicly-owned assets should be privatised, how to achieve competitive electricity commodity prices in a de-regulated generation market, to determine the extent to which customers will be allowed direct access to sellers of electricity, and to determine which changes in industry structure are needed to ensure that control over the common carrier does not hinder fair competition. BC Hydro recently issued a plan for the next decade entitled the Integrated Electricity Plan which suggests that almost all growth in supply on the Hydro system will be limited to a few large projects totalling 900 megawatts, to be owned and operated by either BC Hydro or by the Columbia Power Corporation, another Crown entity. This plan is in complete contrast to the evolution of the electricity industry nearly everywhere else in the world where demand growth is being met almost entirely by small- and medium-scale non-utility resources issuing from competitive markets with minimal public funding. This article looks at why BC Hydro will probably be transformed significantly, even dismantled, in the coming decade. The article begins with a section explaining the cause and effects of major changes in the world-wide electricity industry. This is followed by a section reviewing what BC Hydro did in the 1990s while reform was taking place. The article also describes what BC Hydro intends to do in the next decade and explores reasons why this outcome is unlikely. The final section of the article provides an alternative vision of BC Hydro's future over the next decade. 1 tab., 3 figs

  16. Ontario Hydro annual report 1985

    International Nuclear Information System (INIS)

    1986-04-01

    Ontario Hydro is a corporation without share capital created by a special statute of the Province of Ontario in 1906. It now operates under the authority of the Power Corporation Act, R.S.O. 1980, Chapter 384, as amended, with broad powers to generate, supply and deliver electric power throughout the province. It is also authorized to produce and sell steam and hot water as primary products. The Corporation's prime objective is to supply the people of Ontario with electricity at the lowest feasible cost consistent with high safety and quality of service standards. Ontario Hydro's main activity is wholesaling electric power to municipal utilities in urban areas who, in turn, retail it to customers in their service areas. In 1985, approximately 3,166,000 customers were served by Ontario Hydro and the municipal utilities in the province. Ontario Hydro operates 81 hydraulic, fossil and nuclear generating stations and an extensive power grid across Ontario to meet the province's demands for electric energy. Interconnections with other systems place the Corporation in an extensive electrical grid that covers a large segment of the North American continent. Ontario Hydro is a financially self-sustaining corporation. The Province of Ontario guarantees bonds and notes issued to the public by the Corporation

  17. Hydro One 2002 annual report

    International Nuclear Information System (INIS)

    2003-01-01

    Financial information from Hydro One was presented and a review of its 2002 operations was made available for the benefit of shareholders. Hydro One is the largest electricity delivery company in Ontario and one of the largest in North America. It began operation in 1999 after Ontario Hydro restructured its delivery and generation entities. Hydro One now includes power transmission, power distribution and telecom, with transmission and distribution operations representing 99 per cent of its business. This report indicates that in 2002, the utility had strong financial performance with $344 million in net income. The utility met its health and safety targets, and established a customer advisory board to improve customer satisfaction. A layer of management at the executive level was eliminated to stream-line decision-making and enhance productivity. The electricity network was upgraded and maintained through $546 million in capital expenditures. Non-core functions were sold to ensure a better focus on the core business of electricity delivery. This report presents an operations review as well as consolidated financial statements and common share information including the accounts of Hydro One and its share of assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs

  18. Micro-hydro power: reviewing an old concept

    Energy Technology Data Exchange (ETDEWEB)

    Alward, R.; Eisenbart, S.; Volkman, J.

    1979-01-01

    This informaion package has been prepared to respond to an increasing number of requests for information on micro-hydro systems. It contains a resource directory, which is an attempt to put the reader in contact with the literature, plans, people, and companies appropriate to needs. On a world-wide basis, small-scale, environmentally benign, mechanical, and electrical hydropower systems are common. These are the systems for individual homes, farm, and shop use and generally have power outputs less than 100 kW. For convenience in terminology, this scale of hydro power is referred to as micro-hydro. A decision tree is first presented followed by information on determining the suitability of th site, equipment, economics, sources for financial assistance, regulatory conflicts, cautions and suggestions for the Do-It-Yourselfer, and the Self-Installer, manufacturers and suppliers, and sources of professional services. An annotated bibliography of 16 references is provided. (MCW)

  19. A Class of Large-Update and Small-Update Primal-Dual Interior-Point Algorithms for Linear Optimization

    NARCIS (Netherlands)

    Bai, Y.Q.; Lesaja, G.; Roos, C.; Wang, G.Q.; El Ghami, M.

    2008-01-01

    In this paper we present a class of polynomial primal-dual interior-point algorithms for linear optimization based on a new class of kernel functions. This class is fairly general and includes the classical logarithmic function, the prototype self-regular function, and non-self-regular kernel

  20. Himalayan hydro on the horizon

    International Nuclear Information System (INIS)

    Sharp, Timothy

    2000-01-01

    The prospects for development of hydro in the Himalayas has been enhanced by privatisation and the urgent need for clean electricity in the north of India. There are various hurdles to be overcome before the projects are likely to move forward in earnest before 2005, and these are mentioned. The demand for electricity in India is said to be enormous. At present, there is much polluting industry along the Himalayas. As throughout the Indian privatisation dilemma, the critical issues for development of Himalayan hydro come down to credible commercial power markets and finance. With regard to finance and administrative changes, the Indian government is carrying out a number of actions and these are itemised. The US is vigorously promoting the development of Himalayan hydro as a key to much needed regional co-operation and the World Bank is supportive

  1. Fixing hydro - The forgotten renewable

    International Nuclear Information System (INIS)

    Nalder, N.

    1992-01-01

    Since the dawn of civilization, man has captured the energy potential of falling water, from the water wheels in the fertile crescent of ancient times to today's highly sophisticated conventional and pumped storage projects. As we approach the 21st century, electric energy captured from falling water provides 2.0 trillion kilowatt-hours (21.23 quadrillion Btu), roughly 20% of the world's electric energy. Of the 2.56 billion kilowatts of the world's installed electric generating capacity, hydropower accounts for 24%. Between 1980 and 1989, world generation of hydroelectric power rose from 1.7 trillion kWh to 2.0 trillion kWh. As of January 1, 1988, the US has 90.5 million kW of installed hydro capacity - 70.8 million kW of it under license by the Federal Energy Regulatory Commission - with annual generation estimated at just under 300 billion kWh. Hydro's share, which not long ago comprised 13% of the nation's total capacity, now is just a 9% share. The US has the option to choose one or another path for hydro. If policy makers are willing to coast on a cushion of cheap natural gas, they will continue to shun hydro and put obstacles in its path. But if they come to regard hydro as an attractive resource - as they did only recently - economically and environmentally, they will encourage more balance in resource policies. Believing that interest in a balanced national resource portfolio will grow, the author reviews the past and suggests a possible future course of reasonable development for hydro. The article concludes with some suggested principles that will be needed if the appropriate balance is to be found

  2. Strategies for growth of hydro electric power

    International Nuclear Information System (INIS)

    Khera, D.V.

    1998-01-01

    Hydro power on account of its several inherent advantages has a key role to play in the development of long term energy strategies based on diversified and balance use of natural national resources. Our country is fortunate to be endowed with large hydro-electric potential. It is estimated that the hydro potential while fully developed may yield to an installed capacity of 1,50,000 MW. An attempt has been made in this paper to examine and analyse the status and trend of hydro power development, need for accelerated development of hydro power, myths about hydro electric projects, principal causes responsible for scaling down of hydro share in the total installed capacity and strategies which could restore optimum hydro thermal mix. (author)

  3. Ontario Hydro looks at security

    International Nuclear Information System (INIS)

    Green, B.J.; Kee, B.

    1995-01-01

    Ontario Hydro operates 20 CANDU reactors on three different sites. Since 1984, a review of security arrangements on all the sites has taken place on a five-yearly basis. The review process for 1995 is outlined. The three objectives were as follows: to assess current security threats and risks to the stations; to assess the adequacy of the existing programme to protect against current threats; by comparing the security programme against those of comparable entities to establish benchmarks for good practice as a basis for improvements at Ontario Hydro. Valuable insights gained through the review are listed. These could be useful to other utilities. (UK)

  4. Hydro-Quebec's environmental policy

    International Nuclear Information System (INIS)

    1996-10-01

    Hydro-Quebec established a new environmental policy on August 1, 1996. A summary of the policy was presented. According to this policy statement the utility undertakes to recognize the environmental implications of its activities and assumes responsibilities for these implications by integrating them into its corporate decision-making processes. The following general principles and means of implementation have been highlighted: (1) sustainable development, (2) strict, responsible environmental management, (3) environmental research, (4) enhancement of activities and facilities, (5) information, consultation and dialogue, and (6) environmental responsibility of Hydro-Quebec personnel, subsidiaries and business partners

  5. Hydro-Quebec is profitable

    International Nuclear Information System (INIS)

    Poirier, M.

    1997-01-01

    The pros and cons of the potential privatisation of Hydro-Quebec were discussed. A brief review of charges of less than competent management, low profitability and the corporation's recent administrative restructuring was presented. The general thrust of the argument was that Hydro-Quebec plays a crucial role in the economic development of Quebec, it can be made to be more profitable and that for the good of Quebec it should continue as a public corporation under the control of the provincial government

  6. Marginal-cost pricing for Hydro-Quebec residential customers

    International Nuclear Information System (INIS)

    Paquin, C.

    1994-02-01

    An option available to governments and to utilities such as Hydro-Quebec for responding to objectives of energy efficiency is the adoption of marginal cost pricing. Compared to currently used price structures, marginal cost pricing will allow improvement of price signals and assure an optimal utilization of the resource. That type of pricing could be economically beneficial but may not be desirable from the point of view of revenue distribution. Taking account of Hydro-Quebec's cost structure, pure marginal cost pricing would generate an income that would be strongly contested on equity grounds. For example, it would raise prices 60% for residential customers. Faced with this possibility, an analysis is presented of the impact of a peak-offpeak pricing (or pure marginal cost pricing) on Hydro-Quebec's residential customer energy bills. The marginal costs of Hydro-Quebec are calculated by the method of Bernard and Chatel (1985) and analysis of the results is based on Friedman and Weare (1993). A sample of 28,417 residential customers from a 1989 Hydro-Quebec survey is used in the study. Two scenarios are analyzed; the first allowing comparison of the energy bill only on the basis of marginal costs and of average costs, and the second allowing comparison of the impact of marginal cost pricing on the total bill. In the first scenario, the impact translates into a 31% increase in energy bills for the entire customer class considered; in addition, this impact is inversely proportional to the revenue class. In the second scenario, the increase is 24%. 33 refs., 10 figs., 53 tabs

  7. Small Hydropower - The comeback of small hydropower stations

    International Nuclear Information System (INIS)

    Niederhaeusern, A.

    2008-01-01

    This issue of the 'Erneuerbare Energien' (renewable energies) magazine published by the Swiss Solar Energy Society takes a look at small hydropower projects in Switzerland. In a number of interviews and articles, various topics concerning small hydropower are dealt with. First of all, an interview with Bruno Guggisberg, previously responsible for small hydro at the Swiss Federal Office of Energy, examines the potential of small hydro and the various political, technical and economic influences on such projects. Further articles provide an overview of the various types of small hydro schemes, including power generation using height differences in drinking-water and wastewater installations. As far as the components of small hydro schemes are concerned, various types of turbines and further system components that are needed are examined. A further article takes a look at the small hydro market and the market players involved. Ecological aspects and research activities are discussed in further articles. In a second interview with Martin Boelli, presently responsible for small hydropower at the Swiss Federal Office of Energy, the unused potential for the use of hydropower in Switzerland is discussed. Examples of small-scale hydro schemes are examined and the support offered by the Small Hydropower Program is discussed. Finally the question is asked, if the small hydro market in Switzerland is overheated as a result of promotion schemes such as cost-covering remuneration for electricity from renewable energy sources.

  8. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Druce, D. [British Columbia Hydro, Vancouver, BC (Canada)

    2004-07-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs.

  9. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    International Nuclear Information System (INIS)

    Druce, D.

    2004-01-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs

  10. Ontario Hydro statistical yearbook 1990

    International Nuclear Information System (INIS)

    1990-01-01

    Ontario Hydro was created in 1906 by a special statute of the Province of Ontario. It is a financially self-sustaining corporation without share capital. The yearbook is a compilation of financial data detailed by financial statements and sales and revenue figures for the year 1990. It is broken down by municipalities served in Ontario

  11. The hydro energy; Energie hydraulique

    Energy Technology Data Exchange (ETDEWEB)

    Vachey, C.

    2000-05-01

    This paper is a first approach of the hydro energy energy. It presents the principle and the applications of this energy source. It proposes recommendations on the sizing and the cost estimation of an installation and the environmental impacts of this energy. (A.L.B.)

  12. Ontario Hydro annual report 1975

    International Nuclear Information System (INIS)

    A financial report and statistics on Ontario energy demand are presented. Efforts to secure a reliable supply of coal and uranium are described. Ontario Hydro's expansion is now controlled by capital availability and not power demand, and this has affected 11 construction projects, including heavy water plants and nuclear generating stations. (E.C.B.)

  13. Ontario Hydro annual report 1986

    International Nuclear Information System (INIS)

    1987-04-01

    Ontario Hydro's annual report of the financial position and activities for the year 1986 consists of their financial highlights; corporate profile; customer service and satisfaction; message from Chairman; message from President; 1986 in review; financial section; management report; five-year summary of financial statistics; and comparative statistics

  14. Ontario Hydro statistical yearbook 1990

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-12-31

    Ontario Hydro was created in 1906 by a special statute of the Province of Ontario. It is a financially self-sustaining corporation without share capital. The yearbook is a compilation of financial data detailed by financial statements and sales and revenue figures for the year 1990. It is broken down by municipalities served in Ontario.

  15. 40 CFR Table 3 to Subpart Bbbb of... - Model Rule-Class I Nitrogen Oxides Emission Limits for Existing Small Municipal Waste Combustion...

    Science.gov (United States)

    2010-07-01

    ... Emission Limits for Existing Small Municipal Waste Combustion Unitsa,b,c 3 Table 3 to Subpart BBBB of Part... Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Pt. 60, Subpt. BBBB, Table 3 Table... Municipal Waste Combustion Unitsa,b,c Municipal waste combustion technology Limits for class I municipal...

  16. Hydro Power Reservoir Aggregation via Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Markus Löschenbrand

    2017-12-01

    Full Text Available Electrical power systems with a high share of hydro power in their generation portfolio tend to display distinct behavior. Low generation cost and the possibility of peak shaving create a high amount of flexibility. However, stochastic influences such as precipitation and external market effects create uncertainty and thus establish a wide range of potential outcomes. Therefore, optimal generation scheduling is a key factor to successful operation of hydro power dominated systems. This paper aims to bridge the gap between scheduling on large-scale (e.g., national and small scale (e.g., a single river basin levels, by applying a multi-objective master/sub-problem framework supported by genetic algorithms. A real-life case study from southern Norway is used to assess the validity of the method and give a proof of concept. The introduced method can be applied to efficiently integrate complex stochastic sub-models into Virtual Power Plants and thus reduce the computational complexity of large-scale models whilst minimizing the loss of information.

  17. Single agent and synergistic combinatorial efficacy of first-in-class small molecule imipridone ONC201 in hematological malignancies.

    Science.gov (United States)

    Prabhu, Varun V; Talekar, Mala K; Lulla, Amriti R; Kline, C Leah B; Zhou, Lanlan; Hall, Junior; Van den Heuvel, A Pieter J; Dicker, David T; Babar, Jawad; Grupp, Stephan A; Garnett, Mathew J; McDermott, Ultan; Benes, Cyril H; Pu, Jeffrey J; Claxton, David F; Khan, Nadia; Oster, Wolfgang; Allen, Joshua E; El-Deiry, Wafik S

    2018-01-01

    ONC201, founding member of the imipridone class of small molecules, is currently being evaluated in advancer cancer clinical trials. We explored single agent and combinatorial efficacy of ONC201 in preclinical models of hematological malignancies. ONC201 demonstrated (GI50 1-8 µM) dose- and time-dependent efficacy in acute myeloid leukemia (AML), acute lymphoblastic leukemia (ALL), chronic myelogenous leukemia (CML), chronic lymphocytic leukemia (CLL), diffuse large B-cell lymphoma (DLBCL), mantle cell lymphoma (MCL), Burkitt's lymphoma, anaplastic large cell lymphoma (ALCL), cutaneous T-cell lymphoma (CTCL), Hodgkin's lymphoma (nodular sclerosis) and multiple myeloma (MM) cell lines including cells resistant to standard of care (dexamethasone in MM) and primary samples. ONC201 induced caspase-dependent apoptosis that involved activation of the integrated stress response (ATF4/CHOP) pathway, inhibition of Akt phosphorylation, Foxo3a activation, downregulation of cyclin D1, IAP and Bcl-2 family members. ONC201 synergistically reduced cell viability in combination with cytarabine and 5-azacytidine in AML cells. ONC201 combined with cytarabine in a Burkitt's lymphoma xenograft model induced tumor growth inhibition that was superior to either agent alone. ONC201 synergistically combined with bortezomib in MM, MCL and ALCL cells and with ixazomib or dexamethasone in MM cells. ONC201 combined with bortezomib in a Burkitt's lymphoma xenograft model reduced tumor cell density and improved CHOP induction compared to either agent alone. These results serve as a rationale for ONC201 single-agent trials in relapsed/refractory acute leukemia, non-Hodgkin's lymphoma, MM and combination trial with dexamethasone in MM, provide pharmacodynamic biomarkers and identify further synergistic combinatorial regimens that can be explored in the clinic.

  18. Economically viable and environment-friendly hydro energy in Estonia

    International Nuclear Information System (INIS)

    Saks, Ants; Velner, Harald

    2001-01-01

    Hydro energy has been in oblivion in Estonia for about 30 years now. During the 1960s, most of Estonia's small hydropower plants were closed down, just as it was done in the whole Soviet Union. As the only larger hydro plant, the 125 MW plant in Narva, was situated on the Russian side of the Narva River, there were only two or three small hydro plants left. Even those were exploited at low capacity and mainly for heating the buildings. It was not until the 1990s that a number of enthusiasts started to re-establish the hydro plants by reconstructing old installations. The pre-feasibility study 'Hydropower in Estonia' proposed by Estonian and Swedish experts, showed that the restoration of the hydropower plants and watermills is economically feasible and technically possible if advanced technology is used. Hydropower as an alternative ('green') energy source should be used in the best technical-economical way. The first pilot plant in Estonia, the 200 kW Kamari plant was constructed in 1998 with compact-propeller units, in co-operation with Waterpumps WP Oy and ABB. Today, ten new plants have been constructed or are under construction. Hydropower plants/watermills should be reconstructed in accordance with the legislative acts on environment protection

  19. [Ontario Hydro]. Corporate performance report, 1994

    International Nuclear Information System (INIS)

    1995-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in 1993, beginning with overall results in such areas as customer service, environmental stewardship, human resources, and finance. This is followed by reports from the Generation Business Group, Customer Services Group, Corporate Business Group, General Counsel and Secretary, Ontario Hydro Audit, Strategic Planning, Environment and Communication Group, and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix includes summary financial statements

  20. Integrated operation of hydro thermal system

    International Nuclear Information System (INIS)

    Nanthakumar, J.

    1994-01-01

    Long-term power system expansion planning studies are carried out to meet the electricity requirement in the future. Prior to the expansion planning studies, it is essential to know the energy potential of the existing generating system, especially the hydro power plants. Detailed hydro thermal stimulation studies of the integrated system is therefore carried out to determine the best way to maximise the hydro energy of the existing and committed plants. The results of the integrated system simulated model are stored in numerous files and are available for retrieval. Most important output used for expansion analysis is the energy production of each hydro plant. The annual hydro energy potential of the total hydro system of Sri Lanka for the hydrological year from 1949 to 1988 is given. Hydro condition data with different probability levels are also indicated

  1. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  2. Brigham City Hydro Generation Project

    Energy Technology Data Exchange (ETDEWEB)

    Ammons, Tom B. [Energy Conservation Specialist, Port Ewen, NY (United States)

    2015-10-31

    Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and

  3. Architecture at Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  4. Ontario Hydro Research Division, 1980

    International Nuclear Information System (INIS)

    The work of the Research Division of Ontario Hydro provides technical and scientific support for the engineering and operation of a power system that includes hydraulic, fossil-fired, and nuclear generation. It also relates to the transmission and distribution of electricity and to the need to help customers use electricity with safety and economy. Among the examples of projects given are qualification of CANDU heat transport system components, pressure tube replacement, steam generator integrity, testing for earthquake resistance, and radioactive waste disposal

  5. The influence of INS VNTR class III allele on auxological parameters, glucose, insulin, lipids, and adipocytokines secretion in prepubertal children born small for gestational age.

    Science.gov (United States)

    Stawerska, Renata; Szałapska, Małgorzata; Borowiec, Maciej; Antosik, Karolina; Młynarski, Wojciech; Lewiński, Andrzej

    2016-01-01

    The insulin gene variable number of tandem repeats (INS VNTR) class III allele has been implicated in lower birth weight, obesity, and insulin resistance. We assessed its influence on birth weight in the Polish population and on the current body mass and metabolic profile in prepubertal children born small for gestational age (SGA). DNA for genotyping of INS VNTR was available for 123 subjects born SGA and 132 born appropriate for gestational age (AGA). We identified two alleles: class I and class III. Next, in 112 prepubertal (aged: 6.8 ± 1.38 years) SGA children, the auxological measurements, fasting serum C-peptide, triglycerides, cholesterol, ghrelin, leptin, adiponectin, resistin, cortisol, and insulin-like growth factor type I (IGF-I) concentrations, as well as glucose and insulin during oral glucose tolerance test (OGTT), were assessed and insulin resistance indices were calculated. The results were analysed depending on INS VNTR variants. The occurrence of individual INS VNTR variants were similar in the SGA and AGA groups. In prepubertal SGA children, we did not observe any statistical differences as regards birth weight, body mass, lipids, or adipocytokine concentrations among I/I, I/III, and III/III class groups. The concentration of insulin in 120' of OGTT was significantly higher in class III homozygous than in class I homozygous individuals. Variant INS VNTR class III was shown not to be associated in any essential way with birth weight in the Polish population. Among prepubertal SGA children, the presence of INS VNTR class III is related to higher insulin secretion during OGTT. (Endokrynol Pol 2016; 67 (6): 585-591).

  6. Toronto Hydro annual report, 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Toronto Hydro is the electric utility serving about 219,000 customers in Toronto, Ontario. In 1992, the utility purchased 9.6 billion kWh of electricity from Ontario Hydro, down 3.6% from 1990. Energy sales totalled 9.2 billion kWh, down 4.1% from 1990. Retail electricity rates increased an average of 6.7% in 1992, in spite of an increase in Ontario Hydro's wholesale rate by 8.2%, due to better than anticipated financial results and cost-control measures. The decline in electricity purchases and sales are attributed to economic factors, which also contributed to an increase in the utility's provision for bad debts. The third year of a 13.8-kV conversion project was completed in 1992; this project is converting the existing 4 kV distribution system to the higher voltage since maintenance and repair of the existing system is costly and the equipment is becoming less reliable. New construction, refurbishing, and modernization of equipment were performed at a number of substations. Other improvements in 1992 are reported in the areas of management and engineering systems, personnel policies, work safety, and energy management. Financial statements are included. 11 figs., 4 tabs

  7. Realisation of a small-scale hydro-power plant between two drinking water reservoirs in the municipality of Vira Gambarogno - Feasibility study; Realizzazione di una microcentrale idroelettrica sulla condotta di adduzione tra il serbatoio Monti di Fosano e il serbatoio Fosano. Programma piccole centrali idrauliche. Studio di fattibilita

    Energy Technology Data Exchange (ETDEWEB)

    Mutti, M.

    2009-02-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the drinking water supply in the municipality of Vira Gambarogno, southern Switzerland. The old conduit connecting two drinking water reservoirs has to be replaced. The elevation difference of 260 m is favorable to the installation of a turbine near the lower reservoir. The report presents details on the hydrological data and the dimensioning of the installation. Several variants are considered, which also include the possible reconstruction of the lower reservoir and/or an increased water flow rate from the springs. The electricity production expected is discussed, as is the economic viability of the project.

  8. A Detailed Research Study of Learning and Teaching Core Chemical Engineering to a High Standard in a Mixed-Ability Small Class in Industry

    Science.gov (United States)

    Davey, Kenneth

    2017-01-01

    A detailed study of learning and teaching (L&T) of chemical engineering distillation to a mixed-ability small class of 13 students who are ordinarily full-time in-house employees in industry is reported. The course consisted of 9 × 2-h lectures (18 hours) and 9 × 2-h tutorials (18 hours). It was delivered over nine business days "in…

  9. [Ontario Hydro International Inc.]. Annual report 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Ontario Hydro International Inc. is the international representative of Ontario Hydro. OHII operates as a global utility that markets Ontario Hydro's services and products. Its mission is to be the leader in energy efficiency and sustainable development in the international marketplace. This report describes the year's activities in the following areas: Energy management and environment, hydroelectric generation, nuclear products and services, fossil generation, grid (transmission) business, utility management, Asia Power Group Inc. The document also includes financial highlights and international and customer contracts

  10. BC hydro: Annual report, 1991-1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The third largest electric utility in Canada, B.C. Hydro services almost 1.3 million customers in an area containing over 92 per cent of British Columbia's population. B.C. Hydro's mission is to generate, transmit and distribute electricity. This annual report covers the business and financial performance of B.C. Hydro, and financial statistics.

  11. Analysis of gene expression data from non-small cell lung carcinoma cell lines reveals distinct sub-classes from those identified at the phenotype level.

    Directory of Open Access Journals (Sweden)

    Andrew R Dalby

    Full Text Available Microarray data from cell lines of Non-Small Cell Lung Carcinoma (NSCLC can be used to look for differences in gene expression between the cell lines derived from different tumour samples, and to investigate if these differences can be used to cluster the cell lines into distinct groups. Dividing the cell lines into classes can help to improve diagnosis and the development of screens for new drug candidates. The micro-array data is first subjected to quality control analysis and then subsequently normalised using three alternate methods to reduce the chances of differences being artefacts resulting from the normalisation process. The final clustering into sub-classes was carried out in a conservative manner such that sub-classes were consistent across all three normalisation methods. If there is structure in the cell line population it was expected that this would agree with histological classifications, but this was not found to be the case. To check the biological consistency of the sub-classes the set of most strongly differentially expressed genes was be identified for each pair of clusters to check if the genes that most strongly define sub-classes have biological functions consistent with NSCLC.

  12. Hydro-economic modelling in mining catchments

    Science.gov (United States)

    Ossa Moreno, J. S.; McIntyre, N.; Rivera, D.; Smart, J. C. R.

    2017-12-01

    Hydro-economic models are gaining momentum because of their capacity to model both the physical processes related to water supply, and socio-economic factors determining water demand. This is particularly valuable in the midst of the large uncertainty upon future climate conditions and social trends. Agriculture, urban uses and environmental flows have received a lot of attention from researchers, as these tend to be the main consumers of water in most catchments. Mine water demand, although very important in several small and medium-sized catchments worldwide, has received less attention and only few models have attempted to reproduce its dynamics with other users. This paper describes an on-going project that addresses this gap, by developing a hydro-economic model in the upper Aconcagua River in Chile. This is a mountain catchment with large scale mining and hydro-power users at high altitudes, and irrigation areas in a downstream valley. Relevant obstacles to the model included the lack of input climate data, which is a common feature in several mining areas, the complex hydrological processes in the area and the difficulty of quantifying the value of water used by mines. A semi-distributed model developed within the Water Evaluation and Planning System (WEAP), was calibrated to reproduce water supply, and this was complemented with an analysis of the value of water for mining based on two methods; water markets and an analysis of its production processes. Agriculture and other users were included through methods commonly used in similar models. The outputs help understanding the value of water in the catchment, and its sensitivity to changes in climate variables, market prices, environmental regulations and changes in the production of minerals, crops and energy. The results of the project highlight the importance of merging hydrology and socio-economic calculations in mining regions, in order to better understand trade-offs and cost of opportunity of using

  13. [Ontario Hydro]. Corporate performance report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values established in the approved corporate financial plan and work program budget. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in mid-1993, beginning with overall results in such areas as customer satisfaction, electricity sales, human resources, and environmental protection. This is followed by reports from the Electricity Group (supply, generation, transmission), the Energy Services and Environment Group (load saved and shifted, non-utility generation, retail distribution), and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix contains summary financial statements

  14. 76 FR 67175 - Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp...

    Science.gov (United States)

    2011-10-31

    ...; 14149-000] Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp... Lock Hydro Friends Fund XXXVI (Lock Hydro) and on April 11, 2011, Arkansas Electric Cooperative Corp... & Dam No. 3, as directed by the Corps. Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, 5090...

  15. 78 FR 56224 - Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-09-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3401-049] Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption 1. By documentation filed July 8, 2013 and supplemented... Hydro-WM, LLC. The project is located on the Rockfish River in Nelson County, Virginia. The transfer of...

  16. Nuclear power at Ontario Hydro

    International Nuclear Information System (INIS)

    Tapon, F.; Osborne, T.J.

    1980-01-01

    This case study shows that the diffusion of nuclear power in the electric public utility industry in Canada approximates the logistic growth curve, in agreement with previous results on technological innovation diffusion in the U.S. private sector. Many of the economic variables that affect this diffusion in the private sectors in the U.S. and Canada are also significant in the public sector in Canada. Too few utilities have adopted nuclear technology to permit using regression analysis to study the effect of environmental and regulatory factors on the growth of Ontario Hydro. Thus, cost-benefit analysis for each province might be more effective

  17. Hydro power plants, an overview of the current types and technology

    Science.gov (United States)

    Tkáč, Štefan

    2018-03-01

    Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy independence, relatively high flexibility and adaptability for spatial conditions and energy demands of the end users. Nowadays micro hydro systems could capitalize head range starting at 100cm and the efficiency of hydro systems in general ranges between 65-75% in micro and small applications climbing up to 96% in macro designs. It is mostly due to flexibility in applications, adaptability in combinations with other renewable energy systems and the ability to generate clean, stable, thus reliable energy that makes technical development the most vibrant and noticeable in the micro sphere.

  18. Small-scale hydro power plant on the main drinking water line La Rippaz in Bex, Switzerland - Feasibility study; Petite centrale hydraulique. Aduction d'eau potable La Rippaz. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    Chapallaz, J.-M. [Jean-Marc Chapallaz, Ingenieur EPFL/SIA, Baulmes (Switzerland); Meylan, D. [Perret-Gentil et Rey et Associes SA, Ingenieurs civils et Ingenieurs Conseil EPF/SIA, Lausanne (Switzerland)

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) is a feasibility study for the replacement work of the drinking-water supply line from the location of the spring water collection to a water reservoir belonging to the rock-salt mining company 'Hotel des Salines' in Bex, Switzerland. Built 1887 and following years this water supply system has already been designed for power generation as well. However, a 40 kW micro-scale turbine has only been installed 2005 in the lower part of the water supply system (hydraulic head: 115 m). The new project includes the replacement of the existing piping by a penstock, the construction of a new water collection reservoir at the highest point, the construction of a new 300 kW hydro power plant using the upper part of the water supply system (hydraulic head: 520 m), and some improvements of the existing lower power plant. The available water flow rate lies in the range 57-70 l/s, all the year round. The question arising is whether this construction project could be financed by the benefit from the sale of electricity that could be produced by the two power plants. The authors of the study estimate the power production to be 2.5 kWh/y. If the electricity can be sold at least at CHF 0.20/kWh for 25 years this could finance the whole project that has an estimated cost of CHF 7,000,000.

  19. Romanian achievement in hydro-power plants

    International Nuclear Information System (INIS)

    Cardu, M.; Bara, T.

    1998-01-01

    This paper briefly deals with the achievements relating to Hydro-electric Power Plants within the process of development of the National Power System in Romania. Also presented is the Romanian industry contribution to hydro-electrical power plant equipment manufacturing. (author)

  20. Ontario Hydro Research Division annual report 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The Research Division of Ontario Hydro conducts research in the fields of chemistry, civil engineering, electrical engineering, mechanical engineering, metallurgy, and operations. Much of the research has a bearing on the safe, environmentally benign operation of Ontario Hydro's nuclear power plants. Particular emphasis has been placed on nuclear plant component aging and plant life assurance

  1. Development of Hydro-Mechanical Deep Drawing

    DEFF Research Database (Denmark)

    Zhang, Shi-Hong; Danckert, Joachim

    1998-01-01

    The hydro-mechanical deep-drawing process is reviewed in this article. The process principles and features are introduced and the developments of the hydro-mechanical deep-drawing process in process performances, in theory and in numerical simulation are described. The applications are summarized....... Some other related hydraulic forming processes are also dealt with as a comparison....

  2. Optimal control systems in hydro power plants

    International Nuclear Information System (INIS)

    Babunski, Darko L.

    2012-01-01

    The aim of the research done in this work is focused on obtaining the optimal models of hydro turbine including auxiliary equipment, analysis of governors for hydro power plants and analysis and design of optimal control laws that can be easily applicable in real hydro power plants. The methodology of the research and realization of the set goals consist of the following steps: scope of the models of hydro turbine, and their modification using experimental data; verification of analyzed models and comparison of advantages and disadvantages of analyzed models, with proposal of turbine model for design of control low; analysis of proportional-integral-derivative control with fixed parameters and gain scheduling and nonlinear control; analysis of dynamic characteristics of turbine model including control and comparison of parameters of simulated system with experimental data; design of optimal control of hydro power plant considering proposed cost function and verification of optimal control law with load rejection measured data. The hydro power plant models, including model of power grid are simulated in case of island ing and restoration after breakup and load rejection with consideration of real loading and unloading of hydro power plant. Finally, simulations provide optimal values of control parameters, stability boundaries and results easily applicable to real hydro power plants. (author)

  3. The Eruption of a Small-scale Emerging Flux Rope as the Driver of an M-class Flare and of a Coronal Mass Ejection

    Energy Technology Data Exchange (ETDEWEB)

    Yan, X. L.; Xue, Z. K.; Wang, J. C.; Yang, L. H.; Kong, D. F. [Yunnan Observatories, Chinese Academy of Sciences, 396 Yangfangwang, Guandu District, Kunming 650216, Yunnan (China); Jiang, C. W. [Institute of Space Science and Applied Technology, Harbin Institute of Technology, Shenzhen, 5180055 (China); Priest, E. R. [Mathematics Institute, University of St Andrews, St Andrews, KY16 9SS (United Kingdom); Cao, W. D. [Big Bear Solar Observatory, 40386 North Shore Lane, Big Bear City, CA 92314 (United States); Ji, H. S., E-mail: yanxl@ynao.ac.cn [Key Laboratory for Dark Matter and Space Science, Purple Mountain Observatory, Chinese Academy of Sciences, Nanjing 210008, Jiangsu (China)

    2017-08-10

    Solar flares and coronal mass ejections are the most powerful explosions in the Sun. They are major sources of potentially destructive space weather conditions. However, the possible causes of their initiation remain controversial. Using high-resolution data observed by the New Solar Telescope of Big Bear Solar Observatory, supplemented by Solar Dynamics Observatory observations, we present unusual observations of a small-scale emerging flux rope near a large sunspot, whose eruption produced an M-class flare and a coronal mass ejection. The presence of the small-scale flux rope was indicated by static nonlinear force-free field extrapolation as well as data-driven magnetohydrodynamics modeling of the dynamic evolution of the coronal three-dimensional magnetic field. During the emergence of the flux rope, rotation of satellite sunspots at the footpoints of the flux rope was observed. Meanwhile, the Lorentz force, magnetic energy, vertical current, and transverse fields were increasing during this phase. The free energy from the magnetic flux emergence and twisting magnetic fields is sufficient to power the M-class flare. These observations present, for the first time, the complete process, from the emergence of the small-scale flux rope, to the production of solar eruptions.

  4. Identification of small non-coding RNA classes expressed in swine whole blood during HP-PRRSV infection

    Science.gov (United States)

    It has been established that reduced susceptibility to porcine reproductive and respiratory syndrome virus (PRRSV) has a genetic component. This genetic component may take the form of small non-coding RNAs (sncRNA), which are molecules that function as regulators of gene expression. Various sncRNAs ...

  5. Study of cavitation in hydro turbines. A review

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, Pardeep; Saini, R.P. [Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee 247667 (India)

    2010-01-15

    Reaction turbines basically Francis turbines and propeller/Kaplan turbines are suitable for medium and low head hydropower sites. The management of the small hydropower plants is an important factor, for achieving higher efficiency of hydro turbines with time. Turbines show declined performance after few years of operation, as they get severely damaged due to various reasons. One of the important reasons is erosive wear of the turbines due to cavitation. Reaction turbines, however are more prone to cavitation especially Francis turbines where a zone in the operating range is seriously affected by cavitation and considered as forbidden zone. Cavitation is a phenomenon which manifests itself in the pitting of the metallic surfaces of turbine parts because of the formation of cavities. In the present paper, studies undertaken in this field by several investigators have been discussed extensively. Based on literature survey various aspects related to cavitation in hydro turbines, different causes for the declined performance and efficiency of the hydro turbines and suitable remedial measures suggested by various investigators have been discussed. (author)

  6. Hydro or the waltz of managers

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    A critique of current management and personnel problems at Hydro-Quebec was presented. With 20,000 employees and some of the world's greatest hydroelectric projects to its credit, Hydro-Quebec has historically been a source of great pride for its employees and Quebec's society. However, recent problems related to management, bureaucratization and communications within the corporation have led to important moral problems within the workforce. Management of the corporation under the newly appointed president, Andre Caille, the issue of profitability and competitiveness, the worsening morale among employees and the relationship between Hydro-Quebec and the provincial government were the principal topics discussed

  7. 77 FR 77070 - Black Bear Hydro Partners, LLC;

    Science.gov (United States)

    2012-12-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2727-086] Black Bear Hydro...: October 24, 2012. d. Submitted By: Black Bear Hydro Partners, LLC (Black Bear Hydro). e. Name of Project... designating Black Bear Hydro as the Commission's non-federal representative for carrying out informal...

  8. Acute Effects of Different Formats of Small-Sided and Conditioned Handball Games on Heart Rate Responses in Female Students During PE Classes

    Directory of Open Access Journals (Sweden)

    Filipe Manuel Clemente

    2014-06-01

    Full Text Available The aim of this study was to analyze the impact of different formats (2-a-side, 3-a-side and 4-a-side on heart rate responses of female students during small-sided and conditioned handball games. The heart rate responses were measured using heart rate monitors during physical education classes. Eight female students participated in the study (15 ± 0.0 years. The one-way ANOVA showed statistical differences with moderate effect between the three different formats (F(2, 1674 = 86.538; p-value ˂ 0.001;  = 0.094; Power = 1.0. The results showed that smaller formats (2-a-side and 3-a-side increased the heart rate responses of female students during small-sided and conditioned handball games during physical education (PE classes. The results also suggested that 2-a-side games can be used for anaerobic workouts and the 3-a-side and 4-a-side games can be better used to reach lactate-threshold and for aerobic workouts of high intensity.

  9. A Novel Class of Small Molecule Compounds that Inhibit Hepatitis C Virus Infection by Targeting the Prohibitin-CRaf Pathway

    Directory of Open Access Journals (Sweden)

    Shufeng Liu

    2015-11-01

    Full Text Available Identification of novel drug targets and affordable therapeutic agents remains a high priority in the fight against chronic hepatitis C virus (HCV infection. Here, we report that the cellular proteins prohibitin 1 (PHB1 and 2 (PHB2 are pan-genotypic HCV entry factors functioning at a post-binding step. While predominantly found in mitochondria, PHBs localize to the plasma membrane of hepatocytes through their transmembrane domains and interact with both EGFR and CRaf. Targeting PHB by rocaglamide (Roc-A, a natural product that binds PHB1 and 2, reduced cell surface PHB1 and 2, disrupted PHB-CRaf interaction, and inhibited HCV entry at low nanomolar concentrations. A structure-activity analysis of 32 synthetic Roc-A analogs indicated that the chiral, racemic version of aglaroxin C, a natural product biosynthetically related to Roc-A, displayed improved potency and therapeutic index against HCV infection. This study reveals a new class of HCV entry inhibitors that target the PHB1/2-CRaf pathway.

  10. Inhibition of Dengue Virus Replication by a Class of Small-Molecule Compounds That Antagonize Dopamine Receptor D4 and Downstream Mitogen-Activated Protein Kinase Signaling

    Science.gov (United States)

    Smith, Jessica L.; Stein, David A.; Shum, David; Fischer, Matthew A.; Radu, Constantin; Bhinder, Bhavneet; Djaballah, Hakim; Nelson, Jay A.; Früh, Klaus

    2014-01-01

    ABSTRACT Dengue viruses (DENV) are endemic pathogens of tropical and subtropical regions that cause significant morbidity and mortality worldwide. To date, no vaccines or antiviral therapeutics have been approved for combating DENV-associated disease. In this paper, we describe a class of tricyclic small-molecule compounds—dihydrodibenzothiepines (DHBTs), identified through high-throughput screening—with potent inhibitory activity against DENV serotype 2. SKI-417616, a highly active representative of this class, displayed activity against all four serotypes of DENV, as well as against a related flavivirus, West Nile virus (WNV), and an alphavirus, Sindbis virus (SINV). This compound was characterized to determine its mechanism of antiviral activity. Investigation of the stage of the viral life cycle affected revealed that an early event in the life cycle is inhibited. Due to the structural similarity of the DHBTs to known antagonists of the dopamine and serotonin receptors, we explored the roles of two of these receptors, serotonin receptor 2A (5HTR2A) and the D4 dopamine receptor (DRD4), in DENV infection. Antagonism of DRD4 and subsequent downstream phosphorylation of epidermal growth factor receptor (EGFR)-related kinase (ERK) were found to impact DENV infection negatively, and blockade of signaling through this network was confirmed as the mechanism of anti-DENV activity for this class of compounds. IMPORTANCE The dengue viruses are mosquito-borne, reemerging human pathogens that are the etiological agents of a spectrum of febrile diseases. Currently, there are no approved therapeutic treatments for dengue-associated disease, nor is there a vaccine. This study identifies a small molecule, SKI-417616, with potent anti-dengue virus activity. Further analysis revealed that SKI-417616 acts through antagonism of the host cell dopamine D4 receptor and subsequent repression of the ERK phosphorylation pathway. These results suggest that SKI-417616, or other

  11. Hydro-power: a long history, a bright future

    Energy Technology Data Exchange (ETDEWEB)

    Deudney, D

    1981-07-01

    A brief history of the spread of hydro-power in the world was given. Tables showing hydro-power potential and use, and the % electricity from hydro-power for 13 countries were included along with a graph showing % hydro-power operating, planned and under construction by region. The need for committed and farsighted political leadership for future development and the possibility of hydro production reaching 4 to 6 times its present level were discussed.

  12. Hydro energetic inventory study from Chapecozinho river

    International Nuclear Information System (INIS)

    Pimenta, S.C.; Sureck, M.A.A.; Nascimento, P.R.; Kawasaki, M.; Silva Felipe, R. da.

    1990-01-01

    The Hydro energetic Inventory Study in Chapecozinho River Basin, Brazil is described, comparing the proposed results in 1979 with the actual review in 1989. An analysis for solution the socio-economic and environment problems is also presented. (author)

  13. Emerging Market Attractiveness Index for hydro IPPs

    OpenAIRE

    Weaver, Tyson John

    2013-01-01

    This article addresses two primary commercial themes that affect the future development of the industry. 1. What are the most attractive future emerging markets for hydropower? 2. What parameters are utilized by international hydro IPPs to determine market attractiveness?

  14. Mobile units to hydro geochemistry characterization

    International Nuclear Information System (INIS)

    Gomez, P.; Martinez, B.; Turrero, M.J.

    1994-01-01

    This report shows the mobile units for hydro geochemical studies. The authors analyze the work of mobile unit and the cars that conform the unit: Sampling car and analysis car: The sampling and equipment are took into account as well

  15. Thai-Myanmar joint hydro schemes

    Energy Technology Data Exchange (ETDEWEB)

    Boonpiraks, S [Electricity Generating Authority of Thailand, Nonthaburi (Thailand)

    1992-10-01

    A brief overview is presented here of planned cooperation between Thailand and Myanmar to harness the hydro resources available along the border of the two countries. This would reduce their dependence on thermal generation. (author).

  16. Home and away with Norwegian hydro

    International Nuclear Information System (INIS)

    Jones, Simon

    2000-01-01

    Evidence of Norway's position as a world leader in terms of design and construction of hydroelectric power plant, and its position as the biggest producer of hydro in Europe, is presented. There is still some 30 TWh of hydro available for development in Norway. Statkraft is the country's biggest hydro generator: it owns and operates 54 hydro plants and has shares in a further 30. Statkraft's research has shown that there is still a large market for renewables in Europe and believes that householders are prepared to pay a premium for green energy. Statkraft trades energy with Denmark and Sweden and is believed to be planning further growth overseas. The new millennium is set to bring major changes in Norway's power industry: Hafslund and Elkem have already agreed to merge to create the country's biggest privately-owned power group

  17. Ontario hydro radioactive material transportation field guide

    International Nuclear Information System (INIS)

    Howe, W.

    1987-01-01

    The recent introduction of both the AECB Transport Packaging of Radioactive Material Regulations and Transport Canada's Transportation of Dangerous Goods Regulations have significantly altered the requirements for transporting radioactive material in Canada. Extensive additional training as well as certification of several hundred Ontario Hydro employees has been necessary to ensure compliance with the additional and revised regulatory requirements. To assist in the training of personnel, an 'active' corporate Ontario Hydro Field Guide for Radioactive Material Transport document has been developed and published. The contents of this Field Guide identify current Ontario Hydro equipment and procedures as well as the updated relevant regulatory requirements within Canada. In addition, to satisfying Ontario Hydro requirements for this type of information over two thousand of these Field Guides have been provided to key emergency response personnel throughout the province of Ontario to assist in their transportation accident response training

  18. Annual report 1993 (Ontario Hydro, Toronto)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Ontario Hydro`s prime objective is to supply the people of Ontario with electricity at cost while maintaining high standards of safety and service. The annual report presents energy efficiency and competitiveness, operations in review, the environmental performance of the Corporation, the future, and choices for a sustainable future. A financial review and analysis is also provided, along with an auditor`s report and financial statements.

  19. Hydro in the Kyoto era

    International Nuclear Information System (INIS)

    Bourdon, M.-C.

    2003-01-01

    Quebec has the best performance in North America in terms of greenhouse gas (GHG) emissions. Unlike neighbouring provinces and states which rely heavily on coal for power generation, Quebec generates 96 per cent of its electricity from hydroelectric power. However, no new dams have been built in the past decade in Quebec due to land disputes with Aboriginal communities and general distrust among many ecologists. It takes about 12 years for a hydroelectric project to come to fruition. For that reason, and in order to capitalize on energy market opportunities, Hydro-Quebec is seriously considering expanding its generating capability beyond the needs of Quebec consumers, with gas-fired thermal generating stations. Environmental groups claim that the proposal to build the Suroit combined-cycle facility near the United States border destroys Quebec's efforts to honour the Kyoto Protocol. Economists argue that it is entirely in the spirit of Kyoto if exports of hydroelectricity or natural gas from Canada to the United States leads to less use of oil or coal. But one energy modeling expert at INRS-Energie et Materiaux claims that Quebec has a moral obligation to develop hydroelectricity for its own use as well as for export purposes, noting that any country with the good fortune to have renewable forms of energy, such as wind and hydro, should develop them to lower world GHG emissions. Quebec has many opportunities to sell hydroelectricity even while domestic demand grows. Hydroelectricity from Quebec should interest some states that have adopted their own GHG reduction standards, despite the U.S. government's refusal to ratify Kyoto. It should also interest Ontario and the Maritimes because they will be trying to reduce emissions from their thermal plants. The current situation does not favour the Kyoto Protocol. Exports of electricity from Quebec have dropped because no new dams have been built in recent years and gas-fired plants are looking more attractive to power

  20. Manitoba Hydro 1998 progress report

    International Nuclear Information System (INIS)

    1998-11-01

    Manitoba Hydro has four commitments: 1) they will integrate climate change management into their plans and operations, 2) between 1991 and 2012 they will reduce their greenhouse gas emissions in excess of 6% below 1990 levels, 3) they anticipate that their greenhouse gas production will be in excess of 40% below their 1990 levels by 2010-11, and 4) they have the potential to make a greater contribution to national and international environmental and economic efforts by developing additional hydroelectric energy. The performance to date in implementing their strategy since 1990 includes: the 1330 megawatt Limestone Generating Station came into full production in 1992, which has increased electricity output without additional greenhouse gas emissions; four coal fueled generating units were removed from service at Brandon Generating Station in 1996, reducing coal generating capacity; seven communities previously served have been connected to the province's provincial grid, reducing the emissions from diesel generators; demand-side energy initiatives resulted in a saving of 45 megawatts since 1990, and supply-side initiatives, 152 megawatts; and net exports have increased significantly, from 2,296 megawatt hours in 1990 to 13,888 megawatt hours in 1997-98, which displaces energy that would otherwise have been produced at fossil-fueled generating stations. tabs

  1. Feasibility study of a small hydro power plant in the drinking water supply scheme Val Pesta, Switzerland; Realizzazione di una microcentrale idroelettrica sulla condotta di adduzione tra le sorgenti Val Pesta e il serbatoio Pianascio. Studio di fattibilita

    Energy Technology Data Exchange (ETDEWEB)

    Mutti, M.

    2008-07-01

    This final report for the Swiss Federal Office of Energy presents a feasibility study for the energetic use of the potable water from the Val Pesta, a small valley in Southern Switzerland. These springs deliver water to the city of Locarno and to the municipalities of Lavertezzo and Cugnasco-Gerra. The springs are located 370 m higher than the reservoirs. The hydraulic head can be used to generate electricity. the expected power is about 60 kW, depending on the variant considered. Technical and financial aspects of the project are discussed. Estimated energy yield and cost figures are given.

  2. A detailed research study of learning and teaching core chemical engineering to a high standard in a mixed-ability small class in industry

    Science.gov (United States)

    Davey, Kenneth

    2017-11-01

    A detailed study of learning and teaching (L&T) of chemical engineering distillation to a mixed-ability small class of 13 students who are ordinarily full-time in-house employees in industry is reported. The course consisted of 9 × 2-h lectures (18 hours) and 9 × 2-h tutorials (18 hours). It was delivered over nine business days in situ in an established distillery. The purpose was to (re)learn core distillation of ethanol-water mixes at the level of higher education of a bachelor programme. There was 90% broad agreement that the course encouraged more learning. Students (40%) felt the course was too mathematical, however. Pointedly, there was good agreement (63%) that the course stimulated communication with each other professionally, and customers of the distillery. Results overall provide good evidence that students valued their L&T. The experimental design(s) could be readily applied to a range of fields of knowledge.

  3. Dose escalation of radical radiation therapy in non-small-cell lung cancer using positron emission tomography/computed tomography-defined target volumes: Are class solutions obsolete?

    International Nuclear Information System (INIS)

    Everitt, S.; Schneider-Kolsky, M.; Budd, R.; Yuen, K.; Manus, M Mac

    2008-01-01

    Full text: This study investigated the maximum theoretical radiation dose that could safely be delivered to 20 patients diagnosed with non-small-cell lung cancer. Two three-dimensional conformal radiation therapy (RT) class-solution techniques (A and B) and an individualized three-dimensional conformal RT technique (C) were compared at the standard dose of 60 Gy (part I). Dose escalation was then attempted for each technique successfully at 60 Gy, constrained by predetermined limits for lung and spinal canal (part II). Part I and part II data were reanalysed to include oesophageal dose constraints (part III). In part I, 60 Gy was successfully planned using techniques A, B and C in 19 (95%), 18 (90%) and 20 (100%) patients, respectively. The mean escalated dose attainable for part II using techniques A, B and C were 76.4, 74 and 97.8 Gy, respectively (P < 0.0005). One (5%) patient was successfully planned for 120 Gy using techniques A and B, whereas four (20%) were successfully planned using technique C. Following the inclusion of additional constraints applied to the oesophagus in part III, the amount of escalated dose remained the same for all patients who were successfully planned at 60 Gy apart from two patients when technique C was applied. In conclusion, individualized three-dimensional conformal RT facilitated greater dose conformation and higher escalation of dose in most patients. With modern planning tools, simple class solutions are obsolete for conventional dose radical RT in non-small-cell lung cancer. Highly individualized conformal planning is essential for dose escalation.

  4. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    International Nuclear Information System (INIS)

    Wiebe, P.A.

    1994-01-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs

  5. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    Energy Technology Data Exchange (ETDEWEB)

    Wiebe, P.A

    1994-06-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs.

  6. Hydro-thermal power flow scheduling accounting for head variations

    International Nuclear Information System (INIS)

    El-Hawary, M.E.; Ravindranath, K.M.

    1992-01-01

    In this paper the authors treat the problem of optimal economic operation of hydrothermal electric power systems with variable head hydro plants employing the power flow equations to represent the network. Newton's method is used to solve the problem for a number of test systems. A comparison with solutions with fixed head is presented. In general the optimal schedule requires higher slack bus and thermal power generation and cost in the case of variable head hydro plant than that required by the fixed head hydro plant in all demand periods. Correspondingly, the hydro generation is less in the case of variable head hydro plant compared to fixed head hydro plant. A negligible difference in voltage magnitudes in all the time intervals, but it is observed that slightly higher voltages occur in the case of the fixed head hydro plant. Higher power and energy losses occur in the case of variable head hydro plants compared to the fixed head hydro plants

  7. Mating of the stichotrichous ciliate Oxytricha trifallax induces production of a class of 27 nt small RNAs derived from the parental macronucleus.

    Directory of Open Access Journals (Sweden)

    Alan M Zahler

    Full Text Available Ciliated protozoans possess two types of nuclei; a transcriptionally silent micronucleus, which serves as the germ line nucleus, and a transcriptionally active macronucleus, which serves as the somatic nucleus. The macronucleus is derived from a new diploid micronucleus after mating, with epigenetic information contributed by the parental macronucleus serving to guide the formation of the new macronucleus. In the stichotrichous ciliate Oxytricha trifallax, the macronuclear DNA is highly processed to yield gene-sized nanochromosomes with telomeres at each end. Here we report that soon after mating of Oxytricha trifallax, abundant 27 nt small RNAs are produced that are not present prior to mating. We performed next generation sequencing of Oxytricha small RNAs from vegetative and mating cells. Using sequence comparisons between macronuclear and micronuclear versions of genes, we found that the 27 nt RNA class derives from the parental macronucleus, not the developing macronucleus. These small RNAs are produced equally from both strands of macronuclear nanochromosomes, but in a highly non-uniform distribution along the length of the nanochromosome, and with a particular depletion in the 30 nt telomere-proximal positions. This production of small RNAs from the parental macronucleus during macronuclear development stands in contrast to the mechanism of epigenetic control in the distantly related ciliate Tetrahymena. In that species, 28-29 nt scanRNAs are produced from the micronucleus and these micronuclear-derived RNAs serve as epigenetic controllers of macronuclear development. Unlike the Tetrahymena scanRNAs, the Oxytricha macronuclear-derived 27 mers are not modified by 2'O-methylation at their 3' ends. We propose models for the role of these "27macRNAs" in macronuclear development.

  8. Hydro-plankton characteristics and their relationship with sardine and anchovy distributions on the French shelf of the Bay of Biscay

    Directory of Open Access Journals (Sweden)

    Pierre Petitgas

    2006-06-01

    Full Text Available The spatial pattern in hydro-plankton and fish distributions and their relationship were analysed based on the spring 2000 fisheries acoustic survey. The importance of this survey was that it was a multi-disciplinary platform which collected an extensive set of parameters in the hydro-plankton leading to a potentially finer description of hydro-plankton conditions and fish habitats. More than 50 variables were measured on a grid of stations, in four compartments of the ecosystem: hydrology, nutrients, primary producers and meso-zooplankton. First, a joint analysis of all hydro-plankton compartments was performed using multiple factor analysis (MFA. The method was used to estimate a compromise factorial space common to all compartments in which the stations were grouped by hierarchical clustering. The groups were represented spatially and a strong spatial pattern was evidenced. The fish and their spawned eggs were sampled along transect lines using acoustics and CUFES (continuous underway fish egg samplers. The distribution of the fish and their eggs was analysed in relation to the hydro-plankton groups of stations and difference in fish density across hydro-plankton conditions was tested by a pair-wise multiple comparison procedure. Anchovy was associated with a lesser number of hydro-plankton conditions than sardine. Eggs of both species were also associated with a lesser number of conditions than the fish. Finally, the gain provided by using the extensive set of hydro-plankton parameters for mapping large-scale hydro-plankton conditions was analysed in comparison with the situation in which a small set of parameters was available. The extensive set of parameters allowed more hydro-plankton conditions to be identified but only in the coastal area and not on the shelf. Size fractionated chlorophyll was determinant for tracking river plume hydro-plankton condition. However, the fish did not respond to the variety of the coastal hydro

  9. Retrofitting the potable water supply in Vira Gambarogno, Switzerland - Feasibility study of a small hydro power plant in the Muntin water reservoir; Risanamento dell'acquedotto Monti di Vira. Studio di fattibilita di recupero energetico al serbatoio Muntin

    Energy Technology Data Exchange (ETDEWEB)

    Mutti, M.

    2008-07-01

    This final report for the Swiss Federal Office of Energy describes the retrofitting project for the potable water supply in the municipality of Vira Gambarogno, Southern Switzerland. The current status of the scheme and three possible variants are presented, including the technical and financial aspects. In a second part of the report a feasibility study is reported on for the energetic use of the potable water falling down from the springs, located at 1040 m over sea level, and the Muntin water reservoir, located at 460 m about sea level. A small hydroelectric plant can be created at the entry of the reservoir, with an electric power of about 20 kW, depending on the variant considered. Estimated energy yield and cost figures are given.

  10. Feasibility study for the retrofitting a small hydroelectric power station at the mill of Noiraigue, Switzerland; Projet de rehabilitation d'une centrale hydro-electrique au moulin de Noiraigue. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    Choulot, A.; Chenal, R.; Denis, V. [MHyLab, Montcherand (Switzerland); Chuat, O. [RWB SA, Cernier (Switzerland)

    2006-07-01

    For the time being, the old mill on the left bank of the river Noiraigue, Switzerland is equipped with a small turbine of only a few kW. The present study investigates the technical and economical possibilities for maximizing the electric power production at the site. Two variants were studied: variant A retains the existing construction at the site and comprises a single turbine with a maximum electric power output of 70 kW. The annual energy production would be 348'300 kWh and the production cost 0.13 CHF/kWh. Variant B includes important modifications in the construction - especially the dam and the channels. Two turbines with a total maximum power output of 118 kW are foreseen. The annual energy production would be 448'500 kWh and the production cost 0.15 CHF/kWh. Due to these findings, variant A is preferred and proposed for realization.

  11. Feasibility study for the retrofitting a small hydroelectric power station at the mill of Noiraigue, Switzerland; Projet de rehabilitation d'une centrale hydro-electrique au moulin de Noiraigue. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    Choulot, A; Chenal, R; Denis, V [MHyLab, Montcherand (Switzerland); Chuat, O [RWB SA, Cernier (Switzerland)

    2006-07-01

    For the time being, the old mill on the left bank of the river Noiraigue, Switzerland is equipped with a small turbine of only a few kW. The present study investigates the technical and economical possibilities for maximizing the electric power production at the site. Two variants were studied: variant A retains the existing construction at the site and comprises a single turbine with a maximum electric power output of 70 kW. The annual energy production would be 348'300 kWh and the production cost 0.13 CHF/kWh. Variant B includes important modifications in the construction - especially the dam and the channels. Two turbines with a total maximum power output of 118 kW are foreseen. The annual energy production would be 448'500 kWh and the production cost 0.15 CHF/kWh. Due to these findings, variant A is preferred and proposed for realization.

  12. Hydro-engineering structure and Liptovska Mara Pumped Storage Power Plant

    International Nuclear Information System (INIS)

    Regula, E.

    2005-01-01

    In this paper thirty years history of the Hydro-engineering structure and Liptovska Mara Pumped Storage Power Plant (PSPP) is presented. In 1975 year the Liptovska Mara PSPP was commissioned. There are 2 Kaplan turbines and 2 Derezias reversible turbines with a total installed power 198 MW. The average annual output is 134.5 GWh. As a part of this hydro-engineering structure is Besenova Small-scale power plants with 2 turbines and with installed power 4.64 MW. The average annual output consists 18.3 GWh. There up to end of 2004 year 3,620.172 MWh of electricity was produced. Environmental effects are discussed

  13. Small-scale hydro power in the Anniviers Valley. Project Chippis-Ricard. Variants and preliminary project; Forces Motrices de la Gougra SA. Mini-hydraulique en Anniviers. Projet Chippis-Ricard. Etude de variantes et avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) reports on the preliminary project for a small hydropower plant in Chippis, Switzerland. The project takes advantage of an existing irrigation scheme that deviates water from the Navisence River into two successive tunnels (total 1.8 km) and a following channel built on steep mountain sides. The basic idea of the project is to increase the flow rate entering the tunnels from 265 l/s to 1265 l/s and to lead the additional 1000 l/s to a new penstock connected to the second tunnel's outlet. In this way, a hydraulic head of 130 m could be used for power generation for over 600 households (mechanical power: 0.8 to 1.1 MW, annual electrical energy production: 2.5 to 3.6 GWh, depending on the variant considered). The report reviews the history of water use at this location and its present use as well as a feasibility study previously made. The project is described, including water collection points, conduits, the power station and the particular aspects of the joint use of water for power generation and irrigation from mid April to mid September. Technical details on water quantities and energy production are presented. Financial aspects including construction and operating costs are presented and the economic viability of the project is discussed. Environmental aspects are reviewed. Further steps to be taken in the realisation of this hydropower installation are listed.

  14. Small-scale hydro power in the Anniviers Valley. Project Ayer-Nava. Variants and preliminary project; Forces Motrices de la Gougra SA. Mini-hydraulique en Anniviers. Projet Ayer-Nava. Etude de variantes et avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) reports on the preliminary project for a small hydropower plant near Ayer, a village in the Anniviers Valley (Swiss Alps). Water from the Nava, a steep mountain river, should be lead into a hydraulic scheme for power generation. A hydraulic head of 400 to 550 m is available, depending on the variant considered. The corresponding expected mechanical power is 0.9 to 1.1 MW. For the most promising variant a preliminary project is described (peak electric power: 0.91 MW, annual electrical energy production: 3.1 GWh). The local geology and hydrogeology are presented. The water collection points, conduits and the power station are described. Technical details on water quantities and energy production are presented. Financial aspects including construction and operating costs are presented and the economic viability of the project is discussed. Environmental aspects are reviewed. Further steps to be taken in the realisation of this hydropower installation are listed.

  15. Climate impact on BC Hydro's water resources

    International Nuclear Information System (INIS)

    Smith, D.; Rodenhuis, D.

    2008-01-01

    BC Hydro like many other hydro utilities has used the historical record of weather and runoff as the standard description the variability and uncertainty of the key weather drivers for its operation and planning studies. It has been conveniently assumed that this historical record is or has been statistically stationary and therefore is assumed to represent the future characteristics of climatic drivers on our system. This assumption is obviously no longer justifiable. To address the characterisation of future weather, BC Hydro has a multi-year a directed research program with the Pacific Climate Impacts Consortium to evaluate the impacts of climate change on the water resources that BC Hydro manages for hydropower generation and other uses. The objective of this program is to derive climate change adjusted meteorologic and hydrologic sequences suitable for use in system operations and planning studies. These climate-adjusted sequences then can be used to test system sensitivity to climate change scenarios relative to the baseline of the historical record. This paper describes BC Hydro's research program and the results achieved so far. (author)

  16. BC Hydro shops for GHG offsets

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    BC Hydro is reported to have offered to purchase one million tonnes of carbon dioxide reductions in Canada's Greenhouse Gas Emissions Reduction Trading program (GERT). The program uses a baseline and credit system, where emitters purchase measurable quantities of site-specific GHG reductions. Since mid-1998, the program registered five bilateral trades and seven offers to sell. BC Hydro's recent offer is the first offer to buy. BC Hydro has made the offer to buy in expectation of the introduction of the start of the Kyoto Protocol reductions, and expects to be in the game for some time to come if it is to meet its obligations under the Kyoto Protocol. Preference will be given to projects located in Canada, but BC Hydro will consider reductions created anywhere in the world. The financial range of a single trade is between $50,000 and $1 million. (GHG offsets are currently trading in North America for between $.50 and $3.00 Cdn per metric tonne of carbon dioxide equivalent.) At present, offsets are selling at a heavily discounted price because of the uncertainty that investments made now will be credited against future regulations curbing emitters. Consequently, buying now while prices are low, may lead to sizable benefits later, depending on the actual regulations when they are promulgated. Trading now will also give BC Hydro greater credibility and assurance to have its voice heard when discussions about emissions trading and the implementation of emission trading rules reaches the serious stage

  17. THE IMPACT OF TBILISI USED WATER ON ECOCHEMICAL STATE OF SMALL RIVERS OF THE CITY

    Directory of Open Access Journals (Sweden)

    MARIAM TABATADZE

    2016-03-01

    Full Text Available The centralized sewerage systems and wastewater treatment facilities were constructed in Tbilisi in the middle of the previous century. Nowadays only mechanical treatment stage operates in wastewater treatment facilities of Tbilisi. Moreover, collected wastewater from the sewerage systems often drains without any treatment directly into the small rivers located in Tbilisi area. These rivers feed the main water artery of our capital – river Mtkvari and play an important role in its salt balance. As a result of study of hydro-chemical parameters of Tbilisi small rivers were identified Water Pollution Index (WPI and assessment of small rivers pollution by sewage waters was carried out. It was established that small rivers of Tbilisi belong to the IV and V classes, i.e. less polluted and polluted rivers, while according to the content of fecal matter in the river water they are ranged in the class of polluted and most polluted.

  18. The effect of antenatal education in small classes on obstetric and psycho-social outcomes: a systematic review and meta-analysis protocol.

    Science.gov (United States)

    Brixval, Carina Sjöberg; Axelsen, Solveig Forberg; Andersen, Stig Krøger; Due, Pernille; Koushede, Vibeke

    2014-02-13

    The aims of antenatal education contain both outcomes related to pregnancy, birth and parenthood. Both content and methods of antenatal education have changed over time without evidence of effects on relevant outcomes. The effect of antenatal education in groups, with participation of a small number of participants, may differ from the effect of other forms of antenatal education. The latest Cochrane review, assessed as up-to-date in 2007, concluded that the effect of antenatal education for childbirth or parenthood or both remains largely unknown. This systematic review and meta-analysis aims to assess the effects of antenatal education in small groups on obstetric as well as psycho-social outcomes. Eligible studies include individually randomized as well as cluster-randomized trials irrespective of language, publication year, publication type, and publication status. Only interventions carried out in the Western world will be considered in this review. We will search the databases Medline, EMBASE, CENTRAL, CINAHL, Web of Science, and PsycINFO using relevant search terms. Two independent review authors will extract data and assess risk of bias. Results will be presented as structured summaries of the included trials. A meta-analysis will be conducted. We will assess heterogeneity by using both the Chi-squared test and the I-squared statistic, and conduct subgroup analysis separately for various intervention types. In healthcare systems with limited resources evidence of the effectiveness of services provided is important for decision making, and there is a need for policy makers to implement changes in healthcare systems based on scientific evidence. The effectiveness of antenatal education in small classes is still questioned. Therefore an up-to-date systematic review is needed.This systematic review protocol was registered within the International Prospective Register of Systematic Reviews (PROSPERO) as number CRD42013004319.

  19. Transfer Behavior of the Weakly Acidic BCS Class II Drug Valsartan from the Stomach to the Small Intestine During Fasted and Fed States.

    Science.gov (United States)

    Hamed, Rania; Alnadi, Sabreen Hasan

    2018-05-07

    The objective of this study was to investigate the transfer behavior of the weakly acidic BCS class II drug valsartan from the stomach to the small intestine during fasted and fed states. An in vitro transfer model previously introduced by Kostewicz et al. (J Pharm Pharmacol 56(1):43-51, 2004) based on a syringe pump and a USP paddle apparatus was used to determine the concentration profiles of valsartan in the small intestine. Donor phases of simulated gastric fluid during fasted (FaSSGF) and fed (FeSSGF) states were used to predisperse Diovan® tablets (160 mg valsartan). The initial concentrations of valsartan in FaSSGF and FeSSGF were 6.2 and 91.8%, respectively. Valsartan dispersions were then transferred to acceptor phases that simulate intestinal fluid and cover the physiological properties (pH, buffer capacity, and ionic strength) of the gastrointestinal fluid at a flow rate of 2 mL/min. The pH measurements were reported at time intervals corresponded to those of the transfer experiments to investigate the effect of percent dissolved of valsartan in the donor phase on lowering the pH of the acceptor phases. The f2 similarity test was used to compare the concentration profiles in the acceptor phases. In fasted state, the concentration of valsartan in the acceptor phases ranged between 33.1 and 89.4% after 240 min. Whereas in fed state, valsartan was fully dissolved in all acceptor phases within a range of 94.5-104.9% after 240 min. Therefore, the transfer model provides a useful screen for the concentrations of valsartan in the small intestine during fasted and fed states.

  20. Hydro turbine governor’s power control of hydroelectric unit with sloping ceiling tailrace tunnel

    Science.gov (United States)

    Fu, Liang; Wu, Changli; Tang, Weiping

    2018-02-01

    The primary frequency regulation and load regulation transient process when the hydro turbine governor is under the power mode of hydropower unit with sloping ceiling tailrace are analysed by field test and numerical simulation in this paper. A simulation method based on “three-zone model” to simulate small fluctuation transient process of the sloping ceiling tailrace is proposed. The simulation model of hydraulic turbine governor power mode is established by governor’s PLC program identification and parameter measurement, and the simulation model is verified by the test. The slow-fast-slow “three-stage regulation” method which can improve the dynamic quality of hydro turbine governor power mode is proposed. The power regulation strategy and parameters are optimized by numerical simulation, the performance of primary frequency regulation and load regulation transient process when the hydro turbine governor is under power mode are improved significantly.

  1. The application of the ISO 14001 environmental management system to small hydropower plants; L'application de l'ISO 14001 systeme environnemental de gestion aux petites centrales hydro-electriques

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    advance appropriate environmental actions. The process includes six stages: (1) Initial environmental review, (2) Environmental policy, (3) Planning, (4) Implementation and Operation, (5) Checking and Correcting action and (6) Management review. Certification process in practice is also divided in four steps: (1) Analysis of the environment, (2) List of the regulatory requirements and Checking of conformity with the environmental laws, (3) Defining the environmental policy and building the environmental management system and finally (4) Test audit. The output of this process is Certification audit. Experience feedbacks and testimonies of ISO 14001 certification of small hydroelectric power stations are presented in the second part of this document: - The hydroelectric power stations of Mas Naffre (Tarn - 81, France), of Nevache (Hautes Alpes - 05, France), of Couscouillets (Villelongue, Hautes- Pyrenees, France) and other examples in the EU (Switzerland and Sweden). Existing alternative environmental standards, like 'Eugene' and 'Greenhydro' Standards are presented as well

  2. The little hydro-electricity: the boosting?

    International Nuclear Information System (INIS)

    Brunier, S.; Najac, C.; Roussel, A.M.; Claustre, R; Baril, D.; Marty, D.; Lefevre, P.; Arnould, M.

    2007-01-01

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  3. Revitalizing the nuclear business at Ontario Hydro

    International Nuclear Information System (INIS)

    Talbot, K.

    1994-01-01

    Ontario Hydro, North America's largest electric power utility, with an installed capacity of 34,000 MW, has under gone a major restructuring over the past year to better align itself with a changing electricity market and evolving customer needs. The single largest new business unit within the new Ontario Hydro is Ontario Hydro Nuclear (OHN), responsible for engineering, operation and maintenance of the Corporation's 20 large nuclear units at three generating sites, OHN faces a significant challenge in returning Ontario's nuclear units to the world-leading performance levels they enjoyed in the past, particularly the older Pickering A and Bruce A plants. However, steady progress is being made as evidenced by improving peer reviews and overall capacity and financial performance

  4. Collision data involving hydro-carbon molecules

    International Nuclear Information System (INIS)

    Tawara, H.; Itikawa, Y.; Nishimura, H.; Tanaka, H.; Nakamura, Y.

    1990-07-01

    Hydro-carbon molecules are abundantly produced when graphites are used as internal wall materials of hydrogen plasmas and strongly influence properties of low temperature plasmas near the edges as well as those of high temperature plasmas at the center. In this report, following simple description of the production mechanisms of hydro-carbon molecules under the interactions between graphite and hydrogen plasma, the present status of collision data for hydro-carbon molecules by electron impact is discussed and the relevant data are summarized in a series of figures and tables. It should also be noted that, in addition to fusion plasmas, these hydrocarbon data compiled here are quite useful in other applications such as plasma chemistry and material processing. (author)

  5. BC Hydro triple bottom line report 2002

    International Nuclear Information System (INIS)

    Anon

    2002-08-01

    British Columbia Hydro (BC Hydro) published this document which measures the environmental, social and economic performance of the company. It is a complement to BC Hydro's 2002 Annual Report. The report was prepared to better understand the company's business in terms of its commitment to being an environmentally, socially, and economically responsible company (the three bottom lines). BC Hydro proved its ability to integrate the three bottom lines in decision making processes by carefully examining the environmental, social and economical impacts of programs such as Power Smart, Green and Alternative Energy, and Water Use Planning. All indicators point to BC Hydro achieving its commitment of providing a minimum of 10 per cent of new demand through 2010 with new green energy sources. Water Use Plans were developed for hydroelectric generating stations, and they should all be in place by 2003. Efficiencies realised through the Power Smart program offset the increases in greenhouse gas associated with increased energy demand. Juvenile sturgeon raised in a hatchery were released into the Columbia River in May 2002. The completion of a 40-kilometre trail on the Sunshine Coast was helped by a financial contribution from BC Hydro in the amount of 23,000 dollars. Safety improvements were implemented at eight facilities, such as dam remediation, dam surveillance and instrumentation updates. Scholarships were awarded across the province, along with additional donations to non-profit organizations. Co-op positions were provided for 150 students. Internal energy efficiency programs were successful. Planning is under way for significant maintenance work and equipment replacement projects as the transmission and distribution infrastructure ages. The number of reported indicators was expanded this year. In turn, they were aligned with the revised Global Reporting Initiative (GRI) guidelines. tabs

  6. Alexela ostab Hydro Texaco tanklaketi / Gert D. Hankewitz

    Index Scriptorium Estoniae

    Hankewitz, Gert D.

    2006-01-01

    Kütusefirma Alexela Oil teatas, et ostab tanklaketi Hydro Texaco kõik Balti riikide tanklad. Diagramm: Alexela ja Hydro Texaco majandusnäitajad. Vt. samas: Statoili juht: ühinemine turul muutusi ei too

  7. B.C. Hydro : 1997 annual report

    International Nuclear Information System (INIS)

    1997-01-01

    Operating and financial information from B.C. Hydro for 1997 is presented. B.C. Hydro is the third largest electric utility in Canada. The utility generates between 43,000 and 54,000 gigawatt-hours of electricity annually. More than 80 per cent of the electricity is produced by major hydroelectric generating stations on the Columbia and Peace rivers. This report presents a picture of improved financial performance, details of all revenues and expenditures and capsule summaries of the Utility's operations. The report also addresses issues regarding strategic direction, local and international competition, and consultation and regulatory activities. tabs. and figs

  8. Application of reliability methods in Ontario Hydro

    International Nuclear Information System (INIS)

    Jeppesen, R.; Ravishankar, T.J.

    1985-01-01

    Ontario Hydro have established a reliability program in support of its substantial nuclear program. Application of the reliability program to achieve both production and safety goals is described. The value of such a reliability program is evident in the record of Ontario Hydro's operating nuclear stations. The factors which have contributed to the success of the reliability program are identified as line management's commitment to reliability; selective and judicious application of reliability methods; establishing performance goals and monitoring the in-service performance; and collection, distribution, review and utilization of performance information to facilitate cost-effective achievement of goals and improvements. (orig.)

  9. Navigating the hydro market in Latin America

    International Nuclear Information System (INIS)

    Yermoli, C.A.

    1995-01-01

    The governments of most Latin American countries have yet to establish clear policies about the future ownership of existing generation assets, but they do expect future capacity to be largely developed by the private sector. There were at one time plans for many government-financed hydro projects in the area, but these projects produced much paper and little electricity. Present trends will take the area toward independent power projects, both hydro projects and thermal power projects. This article is a review of those present trends

  10. Hydro-MRI for abdominal diagnostics in children; Hydro-MRT in der Darmdiagnostik bei Kindern

    Energy Technology Data Exchange (ETDEWEB)

    Kern, A.; Schunk, K.; Oberholzer, K.; Thelen, M. [Mainz Univ. (Germany). Klinik und Poliklinik fuer Radiologie; Kessler, M. [Mainz Univ. (Germany). Klinik und Poliklinik fuer Kinderchirurgie

    2001-11-01

    A clinical evaluation of hydro-MRI as an alternative method to barium studies in children with abdominal pain of unknown origin is presented. Patients and Methods: 20 children with abdominal pain of unknown origin aged from 9 - 16 years were examined after oral bowel opacification using 1000 ml of 2.5% mannitol solution with a 1.0T MRI system. The investigation was done in 2 planes (coronal and axial) under breath-hold conditions. Imaging procedures included various sequences (T2W HASTE + FS, contrast-enhanced T1W FLASH FS). Suspicious findings in bowel segments and extra-intestinal changes were assessed. Results: In 21/24 examinations the small bowel was completely visualized, in 15/24 cases colon segments were identified. An accurate assessment of the terminal ileum was not possible in 3/24 procedures. Breathing artefacts occurred in 3/24 examinations. Signs of Crohn's disease were found in 4 examinations, inflammatory changes of the ileum were detected in 3 cases. Inflammation of the colon was demonstrated in 2 children. Furthermore, pathological findings included constipation in one child and inflammation of the ileo-colic and mesenterial lymph nodes were found in another child. Extra-intestinal changes in 3 children were caused by ovarian cysts, and in one case by pleural effusion. In 4 examinations we detected ascites in the absence of other pathological findings. In 5 children there was no pathological correlation in the bowel or extra-intestinal region for the complaints. The children tolerated the hydro-MRI very well. There were no side effects using oral mannitol. (orig.) [German] Ziel: Klinische Evaluation der Hydro-MRT bei Kindern mit unklarer abdomineller Symptomatik als alternative Methode zur fraktionierten Magen-Darm-Passage. Patienten und Methoden: 20 Kinder und Jugendliche im Alter von 9 bis 16 Jahren mit unklaren abdominellen Beschwerden bzw. mit Verdacht auf eine chronisch entzuendliche Darmerkrankung wurden nach einer oralen

  11. Realisation of a small hydro power plant in the new water reservoir of the water supply of the San Abbondio municipality; Realizzazione di una microcentrale nel nuovo serbatoio dell'acquedotto del comune di S. Abbondio. Progetto definitivo nuovo serbatoio. Progetto di massima e studio varianti microcentrale

    Energy Technology Data Exchange (ETDEWEB)

    Conti, M.

    2008-12-15

    This report for the Swiss Federal Office of Energy (SFOE) presents the construction project of a new water reservoir including a micro-scale hydro power plant in the drinking-water supply of the municipality of San Abbondio, Switzerland. Following the development of residential areas a new water reservoir located at higher elevation is needed. A former preliminary study had demonstrated the feasibility of a micro-scale hydro power plant in the water supply. The adaptation of the plant design to the new situation is described. Investment cost is estimated and several variants are compared. Recommendations are given to the authorities.

  12. Design concept of Hydro cascade control system

    International Nuclear Information System (INIS)

    Fustik, Vangel; Kiteva, Nevenka

    2006-01-01

    In this paper a design concept of the comple hydro cascade scheme is presented with the design parameters of the main technical features. The cascade control system architecture is designed considering up-to-date communication and information technology. The control algorithm is based on Pond Level Control and Economic Load Allocation concepts.

  13. Ontario Hydro's plan for used nuclear fuel

    International Nuclear Information System (INIS)

    Stevens-Guille, P.D.; Howes, H.A.; Freire-Canosa, J.

    1992-01-01

    A comprehensive plan for the management of used nuclear fuel has been published by Ontario Hydro. In this paper current practices are discussed and actions leading to disposal in a repository are outlined. Extended storage options are discussed should disposal be delayed

  14. Using historic earnings to value hydro energy

    International Nuclear Information System (INIS)

    Robson, I.A.; Whittington, H.W.

    1993-01-01

    This article briefly presents a technique for assigning a value to the water held in and removed from the hydro reservoir. Using historic earnings as the basis for a series of equations, it aims to give engineers trading energy a reliable means of placing a value on what is effectively a ''free'' resource. (Author)

  15. Resettlement associated with hydro projects in China

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The flow rates of Chinese rivers are subject to major seasonal fluctuations, and as a result large reservoirs have to be constructed for flood control, irrigation, and power generation. As most of the river valleys are densely populated, the relocation and resettlement of people from the reservoir areas are major but unavoidable problems to be addressed in building hydro projects in China. (author)

  16. IPPSO raises Hydro exports in smog negotiations

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The Independent Power Producers of Ontario (IPPSO) requested federal and provincial committees negotiating atmospheric emission standards to review Ontario Hydro's export wheeling plans. IPPSO alleges that Ontario Hydro is preparing to apply pressure on the Canadian export approval process, and is building up a major effort that will increase emissions, contrary to the objectives embodied in a number of environment protection projects such as the Ontario Smog Plan, The Federal-Provincial NOx Management Plan, the Strategic Options Plan, or the Convention on Long-Range Transboundary Air Pollution Draft NOx Protocol Negotiations. IPPSO alleges further that while Ontario Hydro is one of Canada's largest single emitter of greenhouse gases NOx, and SO 2 , and as a public sector corporation it should be the most amenable to serving the public good, the Corporation is doing exactly the opposite: it actively prevents production of electricity from less polluting sources. It is IPPSO's contention that Ontario Hydro's desire to control the Ontario market could come at significant cost to the environment

  17. Possibilities for Wind- and Small Hydro Power in China

    NARCIS (Netherlands)

    Faber, Tom

    2008-01-01

    Due to a fast growing economy and population, China’s electricity requirement vastly increases. To reduce social and environmental impact, a shift from mainly coal fired power generation towards renewable electricity options is a possible solution. The re

  18. Hydro-morphological component of ecological quality of small watercourses

    International Nuclear Information System (INIS)

    Bozon, V.

    2011-01-01

    The contribution is focused on understanding the mechanisms and identify the driving forces of geomorphological processes that result in the creation of a structure of morpho-hydraulic units. (author)

  19. Distributed power in Afghanistan: The Padisaw micro-hydro project

    International Nuclear Information System (INIS)

    Hallett, Michael

    2009-01-01

    The provision of electricity is a vital need in reconstruction and development situations, like that in Afghanistan. Indeed, according to the Afghan government's Afghan National Development Strategy (ANDS) the need for electricity featured in 80% of the Provincial Development Plans as a top priority. With the help of the International Community, the government of Afghanistan is attempting to develop a new market oriented approach to the nationwide provision of electrical power. Although the bulk of the electrification effort is directed toward large scale construction of a national grid, the ANDS explicitly mentions a role for 'micro-hydro, solar, waste and small scale diesel power and energy generating sources'. This article will describe a micro-hydro project in Padisaw village, in the Nurgaram district of Nuristan province located in Northeastern Afghanistan and the role Provincial Reconstruction Team played in working with the local community through the project planning and building processes and offer some observation on how, as the Afghan National Development Strategy is executed, the private sector can play an increasingly significant role in the Afghan distributed energy arena. (author)

  20. Replacement of the Farbtobel hydro power installation in Peist, Switzerland; Gemeinde Peist (GR). Neubau Wasserkraftwerk Farbtobel - Konzessionsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Scherrer, I.; Gadient, N.

    2009-12-15

    This illustrated report for the Swiss Federal Office of Energy (SFOE) deals with various aspects of a small hydro project in Peist, Switzerland. The report presents a project concerning the replacement of the existing Farbtobel small hydro installation. The catchment area involved, its hydrology, high-water considerations and river ecology are examined. The power station concept, installed power and annual production figures are discussed. Investments, operating costs and financial viability are also looked at. Remuneration for the power produced through the Swiss cost-covering remuneration scheme is discussed.

  1. Collaborative Modular Pumped Hydro Energy Storage Design Study

    Energy Technology Data Exchange (ETDEWEB)

    Bibeault, Mark Leonide [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Roybal, Adam [Jemez Mountain Electric Cooperative, Inc., Hernandez, NM (United States); Bailey, Jr., Richard J. [Northern New Mexico College, Espanola, NM (United States)

    2017-09-29

    In May of 2017, Los Alamos National Laboratory (LANL) through the Applied Engineering Technology Division, Jemez Mountain Electric Cooperative Inc. (JMEC), and Northern New Mexico College (NNMC) agreed to enter into a small, joint, non-binding Modular Pumped Hydro (MPH) design study related to grid level energy storage to begin a process of collaboration. Los Alamos National Laboratory's mission is to solve national security challenges through scientific excellence. The mission of Northern New Mexico College is to ensure student success by providing access to affordable, community-based learning opportunities that meet the educational, cultural, and economic needs of the region. Jemez Mountain Electric Cooperative Inc. is the largest electric co-op in the State of New Mexico providing affordable and reliable electricity to customers in the five counties of Rio Arriba, Santa Fe, San Juan, McKinley and Sandoval.

  2. Developments in steam generator leak detection at Ontario Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Maynard, K.J.; Singh, V.P. [Ontario Hydro Technologies, Toronto, Ontario (Canada)

    1998-07-01

    A method for locating small tube leaks in steam generators has been developed and implemented at Ontario Hydro. The technique utilizes both helium leak detection and moisture leak detection. The combination of these two methods allows tube leaks to be detected in any part of the tube bundle, including those submerged below water near the tubesheet. The estimated detection limits for the helium and moisture leak detection systems are 0.001 kg/hr and 0.05 kg/hr respectively, expressed as leak rates measured at typical boiler operating conditions. This technology is best utilized in situations where the leak rate under operating conditions is smaller than the practical limit for fluorescein dye techniques ({approx}2 kg/hour). Other novel techniques have been utilized to increase the reliability and speed of the boiler leak search process. These include the use of argon carrier gas to stabilize the buoyant helium gas in the boiler secondary. (author)

  3. Developments in steam generator leak detection at Ontario Hydro

    International Nuclear Information System (INIS)

    Maynard, K.J.; Singh, V.P.

    1998-01-01

    A method for locating small tube leaks in steam generators has been developed and implemented at Ontario Hydro. The technique utilizes both helium leak detection and moisture leak detection. The combination of these two methods allows tube leaks to be detected in any part of the tube bundle, including those submerged below water near the tubesheet. The estimated detection limits for the helium and moisture leak detection systems are 0.001 kg/hr and 0.05 kg/hr respectively, expressed as leak rates measured at typical boiler operating conditions. This technology is best utilized in situations where the leak rate under operating conditions is smaller than the practical limit for fluorescein dye techniques (∼2 kg/hour). Other novel techniques have been utilized to increase the reliability and speed of the boiler leak search process. These include the use of argon carrier gas to stabilize the buoyant helium gas in the boiler secondary. (author)

  4. Tilting-Pad Guide Bearing in Large Hydro-unit

    Directory of Open Access Journals (Sweden)

    Li-Feng Ma

    2000-01-01

    Full Text Available A new numerical method is proposed for predicting the nonlinearity of tilting-pad guide bearing oilfilm force in the rotor-bearing system in a large hydro-unit. Nonlinear displacement and velocity of the journal center, as well as nonlinear tilting angles and angular velocities of the pads in non-stationary Reynolds equation are taken into account. This method is also suited for other small rotor-bearing system. As an example, the response due to a momentarily created unbalance is Calculated. The nonlinear motion patterns of the pad and journal whirling orbit are obtained. Finally, the nonlinear orbit is compared to the linear one that could be calculated from linear stiffness and damping coefficients. It is shown that there are important differences between those two orbits and that the nonlinear simulation is more accurate.

  5. Global analysis of a renewable micro hydro power generation plant

    Science.gov (United States)

    Rahman, Md. Shad; Nabil, Imtiaz Muhammed; Alam, M. Mahbubul

    2017-12-01

    Hydroelectric power or Hydropower means the power generated by the help of flowing water with force. It is one the best source of renewable energy in the world. Water evaporates from the earth's surface, forms clouds, precipitates back to earth, and flows toward the ocean. Hydropower is considered a renewable energy resource because it uses the earth's water cycle to generate electricity. As far as Global is concerned, only a small fraction of electricity is generated by hydro-power. The aim of our analysis is to demonstrate and observe the hydropower of the Globe in micro-scale by our experimental setup which is completely new in concept. This paper consists of all the Global and National Scenario of Hydropower. And how we can more emphasize the generation of Hydroelectric power worldwide.

  6. Hydro Ottawa achieves Smart Meter milestone

    International Nuclear Information System (INIS)

    Anon.

    2008-01-01

    As Ontario's second largest municipal electricity company, Hydro Ottawa serves more than 285,000 residential and business customers in the city of Ottawa and the village of Casselman. Since 2006, the utility has installed more than 230,000 Smart Meters throughout its service territory in an effort to provide better services to its customers. This initiative represents the largest operational advanced metering infrastructure network in Canada. This move was necessary before time-of-use rates can be implemented in Ottawa. The Smart Meters deliver data wirelessly to Hydro Ottawa's Customer Information System for billing and eliminating manual readings. The Smart Meters are designed to promote more efficient use of electricity. The Government of Ontario has passed legislation requiring the installation of Smart Meters throughout the province by the end of 2010

  7. Chalifoux Dairy and Hydro-Quebec, partners in innovation; Laiterie Chalifoux et Hydro-Quebec, partenaires dans l`innovation des entreprises quebecoises

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1996-12-31

    Recently, Chalifoux Dairy of Sorel, Quebec, invested, with the help of Hydro-Quebec, in three new technologies to increase the energy efficiency of the production line. A summary of these technological improvements was presented. The three new technologies were induction heating pasteurization, ultraviolet sterilization and ultrafiltration. Ultra-high temperature (UHT) induction heating is now used to pasteurize cream and chocolate milk. This new pasteurization method has reduced product returns from 5 per cent to nil. UHT cream is packaged in small disposable containers that are previously sterilized by a radiant ultraviolet source. An ultrafiltration method also has been implemented for production of specialty cheese at the dairy. This process yields 20 per cent more production with 30 per cent less energy than traditional methods. Hydro-Quebec assisted Chalifoux Dairy with a subsidy of $596,000 for these energy-efficiency modifications.

  8. Unmanned operation of Hydro Power Plants

    International Nuclear Information System (INIS)

    Regula, E.

    2008-01-01

    Intentions to launch unmanned operation are no news, the very first occurred in Hydro Power Plants (HPP) at the time when the first computer technology was implemented into process of power generation, i.e. no later than in 1960 s . ENEL entering Slovenske elektrarne not only revived but significantly accelerated the implementation process of unmanned operation. Experience of ENEL says that unmanned operation means better reliability of the HPP and this is the priority. (author)

  9. Development of coal hydro gasification technology

    International Nuclear Information System (INIS)

    Itoh, Kazuo; Nomura, Kazuo; Asaoka, Yoshikiyo; Kato, Shojiro; Seo, Tomoyuki

    1997-01-01

    Taking a potential future decrease in natural gas supply into consideration, we are looking for a way to secure a stable supply of high quality substitute natural gas made from coal (which occurs abundantly throughout the world) in large volumes at low cost. We are working towards our goal of commercializing coal hydro gasification technology in the 2010's and have started developing elemental technology from FY, 1996 as a part of the governmental new energy program. (au)

  10. Hydro power plants, an overview of the current types and technology

    Directory of Open Access Journals (Sweden)

    Tkáč Štefan

    2018-03-01

    Full Text Available Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy independence, relatively high flexibility and adaptability for spatial conditions and energy demands of the end users. Nowadays micro hydro systems could capitalize head range starting at 100cm and the efficiency of hydro systems in general ranges between 65-75% in micro and small applications climbing up to 96% in macro designs. It is mostly due to flexibility in applications, adaptability in combinations with other renewable energy systems and the ability to generate clean, stable, thus reliable energy that makes technical development the most vibrant and noticeable in the micro sphere.

  11. The near boiling reactor: Conceptual design of a small inherently safe nuclear reactor to extend the operational capability of the Victoria Class submarine

    Science.gov (United States)

    Cole, Christopher J. P.

    Nuclear power has several unique advantages over other air independent energy sources for nuclear combat submarines. An inherently safe, small nuclear reactor, capable of supply the hotel load of the Victoria Class submarines, has been conceptually developed. The reactor is designed to complement the existing diesel electric power generation plant presently onboard the submarine. The reactor, rated at greater than 1 MW thermal, will supply electricity to the submarine's batteries through an organic Rankine cycle energy conversion plant at 200 kW. This load will increase the operational envelope of the submarine by providing up to 28 continuous days submerged, allowing for an enhanced indiscretion ratio (ratio of time spent on the surface versus time submerged) and a limited under ice capability. The power plant can be fitted into the existing submarine by inserting a 6 m hull plug. With its simplistic design and inherent safety features, the reactor plant will require a minimal addition to the crew. The reactor employs TRISO fuel particles for increased safety. The light water coolant remains at atmospheric pressure, exiting the core at 96°C. Burn-up control and limiting excess reactivity is achieved through movable reflector plates. Shut down and regulatory control is achieved through the thirteen hafnium control rods. Inherent safety is achieved through the negative prompt and delayed temperature coefficients, as well as the negative void coefficient. During a transient, the boiling of the moderator results in a sudden drop in reactivity, essentially shutting down the reactor. It is this characteristic after which the reactor has been named. The design of the reactor was achieved through modelling using computer codes such as MCNP5, WIMS-AECL, FEMLAB, and MicroShield5, in addition to specially written software for kinetics, heat transfer and fission product poisoning calculations. The work has covered a broad area of research and has highlighted additional areas

  12. The near boiling reactor : conceptual design of a small inherently safe nuclear reactor to extend the operational capability of the Victoria Class submarine

    International Nuclear Information System (INIS)

    Cole, C.J.P.

    2005-01-01

    Nuclear power has several unique advantages over other air independent energy sources for nuclear combat submarines. An inherently safe, small nuclear reactor, capable of supply the hotel load of the 'Victoria' Class submarines, has been conceptually developed. The reactor is designed to complement the existing diesel electric power generation plant presently onboard the submarine. The reactor, rated at greater than 1 MW thermal, will supply electricity to the submarine's batteries through an organic Rankine cycle energy conversion plant at 200 kW. This load will increase the operational envelope of the submarine by providing up to 28 continuous days submerged, allowing for an enhanced indiscretion ratio (ratio of time spent on the surface versus time submerged) and a limited under ice capability. The power plant can be fitted into the existing submarine by inserting a 6 m hull plug. With its simplistic design and inherent safety features, the reactor plant will require a minimal addition to the crew. The reactor employs TRISO fuel particles for increased safety. The light water coolant remains at atmospheric pressure, exiting the core at 96 o C. Burn-up control and limiting excess reactivity is achieved through movable reflector plates. Shut down and regulatory control is achieved through the thirteen hafnium control rods. Inherent safety is achieved through the negative prompt and delayed temperature coefficients, as well as the negative void coefficient. During a transient, the boiling of the moderator results in a sudden drop in reactivity, essentially shutting down the reactor. It is this characteristic after which the reactor has been named. The design of the reactor was achieved through modelling using computer codes such as MCNP5, WIMS-AECL, FEMLAB, and MicroShield5, in addition to specially written software for kinetics, heat transfer and fission product poisoning calculations. The work has covered a broad area of research and has highlighted additional

  13. HydroSoft coil versus HydroCoil for endovascular aneurysm occlusion study: A single center experience

    International Nuclear Information System (INIS)

    Guo Xinbin; Fan Yimu; Zhang Jianning

    2011-01-01

    Background and purpose: The HydroCoil Embolic System (HES) was developed to reduce recurrences of aneurysms relative to platinum coils. But the HydroCoil Embolic System was characterized with many limitations. The manufacturer had recognized the challenge and recently a new design of hydrogel-coated coil-HydroSoft has become available in the market as the new generation HydroCoil. We reported our initial experience using HydroSoft coil versus HydroCoil in our center. Methods: 75 aneurysms embolized primarily using HydroSoft Coils from July 2008 to May 2009 were compared with 66 volume- and shape-matched aneurysms treated with HydroCoils from March 2006 to August 2008. Outcome measures included length and number of coils used, contrast volume, and length of hospital stay. During embolization, a stable framework was first established with bare coils, and hydrogel-coated coils were used subsequently to increase the packing density. Follow-up angiographic results 6 months after treatment were evaluated among some of the patients. Results: Successful coil embolization was achieved in all patients. There were no differences in average total coil length used per aneurysm. There were no differences in length of hospital stay and packing density. HydroSoft coils were more suitable using as the finishing or final coil. HydroSoft coil decreased the procedure-related retreated rates, and aneurysm packing was finished with soft, flexible HydroSoft coil and decreased the neck remnant rates. Follow-up angiography in HydroSoft-treated patients at 6 months revealed aneurysm stability without significant residual neck. Conclusions: HydroSoft coil allowed us to deploy coated coils with good packing density. A slight expansion of these coils at the neck can be expected to reduce neck remnant and potentially inhibit recurrence.

  14. An Overview of Power Topologies for Micro-hydro Turbines

    DEFF Research Database (Denmark)

    Nababan, Sabar; Muljadi, E.; Blaabjerg, Frede

    2012-01-01

    This paper is an overview of different power topologies of micro-hydro turbines. The size of micro-hydro turbine is typically under 100kW. Conventional topologies of micro-hydro power are stand-alone operation used in rural electrical network in developing countries. Recently, many of micro-hydro...... power generations are connected to the distribution network through power electronics (PE). This turbines are operated in variable frequency operation to improve efficiency of micro-hydro power generation, improve the power quality, and ride through capability of the generation. In this paper our...... discussion is limited to the distributed generation. Like many other renewable energy sources, the objectives of micro-hydro power generation are to reduce the use of fossil fuel, to improve the reliability of the distribution system (grid), and to reduce the transmission losses. The overview described...

  15. Dependent Classes

    DEFF Research Database (Denmark)

    Gasiunas, Vaidas; Mezini, Mira; Ostermann, Klaus

    2007-01-01

    of dependent classes and a machine-checked type soundness proof in Isabelle/HOL [29], the first of this kind for a language with virtual classes and path-dependent types. [29] T.Nipkow, L.C. Poulson, and M. Wenzel. Isabelle/HOL -- A Proof Assistant for Higher-Order Logic, volume 2283 of LNCS, Springer, 2002......Virtual classes allow nested classes to be refined in subclasses. In this way nested classes can be seen as dependent abstractions of the objects of the enclosing classes. Expressing dependency via nesting, however, has two limitations: Abstractions that depend on more than one object cannot...... be modeled and a class must know all classes that depend on its objects. This paper presents dependent classes, a generalization of virtual classes that expresses similar semantics by parameterization rather than by nesting. This increases expressivity of class variations as well as the flexibility...

  16. Vibration analysis of a hydro generator for different operating regimes

    Science.gov (United States)

    Haţiegan, C.; Pădureanu, I.; Jurcu, M.; Nedeloni, M. D.; Hamat, C. O.; Chioncel, C. P.; Trocaru, S.; Vasile, O.; Bădescu, O.; Micliuc, D.; (Filip Nedeloni, L.; Băra, A.; (Barboni Haţiegan, L.

    2017-01-01

    Based on experimental measurements, this paper presents the vibration analysis of a hydro generator that equips a Kaplan hydraulic turbine of a Hydropower plant in Romania. This analysis means vibrations measurement to different operating regimes of the hydro generator respectively before installing it and into operation, namely putting off load mode (unexcited and excited) respectively putting on load mode. By comparing, through the experimental results obtained before and after the operation of hydro aggregates are observed vibrations improvements.

  17. Temperature buffer test. Hydro-mechanical and chemical/ mineralogical characterizations

    International Nuclear Information System (INIS)

    Aakesson, Mattias; Olsson, Siv; Dueck, Ann; Nilsson, Ulf; Karnland, Ola; Kiviranta, Leena; Kumpulainen, Sirpa; Linden, Johan

    2012-01-01

    The Temperature Buffer Test (TBT) is a joint project between SKB/ANDRA and supported by ENRESA (modeling) and DBE (instrumentation), which aims at improving the understanding and to model the thermo-hydro-mechanical behavior of buffers made of swelling clay submitted to high temperatures (over 100 deg C) during the water saturation process. The test has been carried out in a KBS-3 deposition hole at Aspo HRL. It was installed during the spring of 2003. Two steel heaters (3 m long, 0.6 m diameter) and two buffer arrangements have been investigated: the lower heater was surrounded by rings of compacted Wyoming bentonite only, whereas the upper heater was surrounded by a composite barrier, with a sand shield between the heater and the bentonite. The test was dismantled and sampled during the winter of 2009/2010. This report presents the hydro-mechanical and chemical/mineralogical characterization program which was launched subsequent to the dismantling operation. The main goal has been to investigate if any significant differences could be observed between material from the field experiment and the reference material. The field samples were mainly taken from Ring 4 (located at the mid-section around the lower heater), in which the temperature in the innermost part reached 155 deg C. The following hydro-mechanical properties have been determined for the material (test technique within brackets): hydraulic conductivity (swelling pressure device), swelling pressure (swelling pressure device), unconfined compression strength (mechanical press), shear strength (triaxial cell) and retention properties (jar method). The following chemical/mineralogical properties (methods within brackets) were determined: anion analysis of water leachates (IC), chemical composition (ICP/AES+MS, EGA), cation exchange capacity (CEC, Cu-trien method) and exchangeable cations (exchange with NH4, ICPAES), mineralogical composition (XRD and FTIR), element distribution and microstructure (SEM and

  18. Competition policy and regulation in hydro-dominated electricity markets

    International Nuclear Information System (INIS)

    Rangel, Luiz Fernando

    2008-01-01

    This paper discusses the main competition issues that arise in electricity systems dominated by hydro generation, arguing that technological differences between hydro and thermal plants may allow hydropower producers to exert market power in different and subtler ways compared to thermal generators. The key for market power in hydro-based systems is the strategic allocation of a given amount of output across periods, rather than a straightforward reduction of total output. The paper examines the interaction between strategic hydro reservoir operation and transmission capacity constraints, and summarizes the implications of market power for system reliability. A review of recent relevant literature is included. Finally, possible interventions to mitigate market power are analysed

  19. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  20. Hydro-MRI for abdominal diagnostics in children

    International Nuclear Information System (INIS)

    Kern, A.; Schunk, K.; Oberholzer, K.; Thelen, M.; Kessler, M.

    2001-01-01

    A clinical evaluation of hydro-MRI as an alternative method to barium studies in children with abdominal pain of unknown origin is presented. Patients and Methods: 20 children with abdominal pain of unknown origin aged from 9 - 16 years were examined after oral bowel opacification using 1000 ml of 2.5% mannitol solution with a 1.0T MRI system. The investigation was done in 2 planes (coronal and axial) under breath-hold conditions. Imaging procedures included various sequences (T2W HASTE + FS, contrast-enhanced T1W FLASH FS). Suspicious findings in bowel segments and extra-intestinal changes were assessed. Results: In 21/24 examinations the small bowel was completely visualized, in 15/24 cases colon segments were identified. An accurate assessment of the terminal ileum was not possible in 3/24 procedures. Breathing artefacts occurred in 3/24 examinations. Signs of Crohn's disease were found in 4 examinations, inflammatory changes of the ileum were detected in 3 cases. Inflammation of the colon was demonstrated in 2 children. Furthermore, pathological findings included constipation in one child and inflammation of the ileo-colic and mesenterial lymph nodes were found in another child. Extra-intestinal changes in 3 children were caused by ovarian cysts, and in one case by pleural effusion. In 4 examinations we detected ascites in the absence of other pathological findings. In 5 children there was no pathological correlation in the bowel or extra-intestinal region for the complaints. The children tolerated the hydro-MRI very well. There were no side effects using oral mannitol. (orig.) [de

  1. Hydro investment analysis under new market conditions

    Energy Technology Data Exchange (ETDEWEB)

    Doorman, Gerard

    2010-07-01

    Full text: A future energy system with stronger coupling to Europe and with an increased share of non-regulated renewables will lead to increasing variability of the demand faced by the hydro system. In a market based system these variations will be reflected by larger daily price variations, both in the Elspot day ahead market, the Elbas intraday market and in the balancing market. With its unique regulation capabilities, hydro power will be very well positioned to handle these variations. However, existing model concepts for long term hydro scheduling were not developed for this framework, and do not take the new market conditions into account to a sufficient degree. Therefore hydro scheduling tools used for upgrading and investment analysis as well as analysing consequences of new environmental demands need adaptation to a finer temporal resolution, and to perform optimisation under varying constraints and uncertain input data for inflow and electricity prices. Focus is on investment analysis for a river system or power producer. Existing models can be grouped in the long-term (scheduling models with a time horizon up to 5 years) EOPS (Vansimtap), EOPS-ST (SimtapEffekt) and ProdRisk, and the shortterm scheduling models with a typical time horizon up to a few weeks, but focus on 1-2 days (SHOP and ID-SIM). A perfect tool in the present context would combine the properties of the long term stochastic optimisation models with the modelling details of SHOP and/or ID-SIM. However, this is probably not possible and simplifications will be necessary. Some important deficiencies in the present long term models are: Insufficiently realistic plant models in the relevant optimization models; Time delays are not handled; Handing of flexible / state dependent constraints; Handling of ramping constraints; Modelling of the cost of frequent regulations (wear and tear); Reserve markets As a result of these deficiencies the investment analysis does not adequately assess the value

  2. Classes of modules

    CERN Document Server

    Dauns, John

    2006-01-01

    Because traditional ring theory places restrictive hypotheses on all submodules of a module, its results apply only to small classes of already well understood examples. Often, modules with infinite Goldie dimension have finite-type dimension, making them amenable to use with type dimension, but not Goldie dimension. By working with natural classes and type submodules (TS), Classes of Modules develops the foundations and tools for the next generation of ring and module theory. It shows how to achieve positive results by placing restrictive hypotheses on a small subset of the complement submodules, Furthermore, it explains the existence of various direct sum decompositions merely as special cases of type direct sum decompositions. Carefully developing the foundations of the subject, the authors begin by providing background on the terminology and introducing the different module classes. The modules classes consist of torsion, torsion-free, s[M], natural, and prenatural. They expand the discussion by exploring...

  3. Market Power in Hydro-Thermal Supply

    International Nuclear Information System (INIS)

    Edin, Karl-Axel

    2006-12-01

    Despite having had a deregulated electricity market in Sweden for over ten years we still need to increase our understanding as to how deregulated electricity markets actually work and how possible problems are to be solved. One question that is always in focus is if the competition between generators in the Nordic electricity market really works the way it was intended. Many argue that the concentration in ownership of generation plants already has gone too far. Together with joint ownership in nuclear facilities and barriers for entrance, critics say that this has resulted in higher electricity prices than necessary. In this report different methods to (ex ante) study potential possibilities for generating firms to influence the electricity price (market power) and (ex post) discover possible manipulation through analysing the spot price and other observed factors on the electricity market are analysed. The purpose of the longer underlying paper is to give a comprehensive treatment of the electricity market with storage, i.e. hydro power, with an auction market organisation and to test the models on the Nordic market in order to explore the explanatory power of auction market theory and the theory of contestable market. The main theoretical effort in the paper concerns auction theory with inventories. The paper develops an inter-temporal auction model of a thermal-hydro power market. Parallel to the derivation of the basic equations a numerical model is developed in order to illustrate the results of the model. Section 2 of the present paper summarizes the basic equations (derived in the longer paper) for an inter-temporal auction thermal-hydro market. Section 3 contains the illustrations of solutions to equations for some stylized markets. In section 4 the auction model is tested on the Nordic market

  4. Standardized CSR and climate performance: why is Shell willing, but Hydro reluctant?; Shell; Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Boasson, Elin Lerum; Wettestad, Joergen

    2007-06-15

    This report aims to contribute to the ongoing discussion concerning whether CSR merely serves to streamline company rhetoric or also has an influence on actual efforts. We discuss the tangible effects of CSR instruments on the climate-related rules and performances of the two different oil companies Hydro and Shell. First we explore whether similar CSR instruments lead to similar climate-related rules and practices in the two companies. Both Hydro and Shell adhere to the Global Compact (GC), the Global Reporting Initiative (GRI), the Carbon Disclosure Project (CDP) and the Global Gas Flaring Reduction Public-Private Partnership (GGFR). The report concludes that the GC has not rendered any tangible effects in either of the companies. Concerning the other instruments, Hydro has only followed the instrument requirements that fit their initial approach, and refrained from all deviating requirements. Shell has been more malleable, but we have noted few effects on the actual emissions and business portfolio resulting from the instrument adherence. Second, we assess how the differing results of the similar CSR portfolio may be explained. The reluctant attitude of the leaders in Hydro and the strong CSR motivation of Shell's executives result in significant differences. Hydro executives are able to constrain the effects of the instrument adherence. With Shell we note the opposite pattern: Its leaders promoted the instruments to be translated into internal rules, but a general lack of hierarchical structures hinders them from governing the conduct of various sub-organisations. The very diversity of the Shell culture helps to explain why the efforts of its executives have resulted in limited impact. The strength of the Hydro culture makes the corporation resistant to the instruments. Moreover, Hydro is strikingly shielded by virtue of its strong position in Norway. In contrast, Shell is more strongly affected by the global field of petroleum and the global field of CSR

  5. Hydro-electric power - potential and limitations

    International Nuclear Information System (INIS)

    Amundsen, T.

    1995-01-01

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world's growing population, the unavoidable conclusion is that more power is to be produced. 3 figs

  6. Global warming: a changing climate for hydro

    International Nuclear Information System (INIS)

    Oud, E.

    1993-01-01

    This paper quantifies the benefits attributable to hydroelectric power generation in preventing carbon dioxide emissions from the use of thermal plants. It proposes that utilities and funding agencies consider the societal costs associated with the emission of CO 2 in power system planning. It also suggests that the industrialized countries should consider changing their funding practice and give more appropriate credits for the construction of hydro plants in developing countries, with a view to avoiding the construction and operation of fossil fuelled powerplants. (author)

  7. Main coolant pump testing at Ontario Hydro

    International Nuclear Information System (INIS)

    Hartlen, R.

    1991-01-01

    This article describes Ontario Hydro Research Division's experience with a computerized data acquisition and analysis system for monitoring mechanical vibration in reactor coolant pumps. The topics covered include bench-marking of the computer system and the coolant pumps, signatures of normal and malfunctioning pumps, analysis of data collected by the monitoring system, simulation of faults, and concerns that have been expressed about data interpretation, sensor types and locations, alarm/shutdown limits and confirmation of nondestructive examination testing. This presentation consists of overheads only

  8. Hydro-electric power - potential and limitations

    Energy Technology Data Exchange (ETDEWEB)

    Amundsen, T.

    1995-12-31

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world`s growing population, the unavoidable conclusion is that more power is to be produced. 3 figs.

  9. The Ontario Hydro mortality surveillance programme

    International Nuclear Information System (INIS)

    Anderson, T.W.

    1985-01-01

    The Ontario Hydro mortality surveillance programme was the first such study established in any group of radiation workers. Copies of annual reports are available to senior officials of both management and union and to members of the general public. Apart from an elevated Standardized Mortality Ratio in the 15.0 - 19.9 cSv range, there is no suggestion of any rising cancer death rate with increased lifetime radiation dose. It should be noted that employees who had left before pensionable age were not included in the study. Results of the study are presented in tabular form

  10. Analysis of a pico tubular-type hydro turbine performance by runner blade shape using CFD

    Science.gov (United States)

    Park, J. H.; Lee, N. J.; Wata, J. V.; Hwang, Y. C.; Kim, Y. T.; Lee, Y. H.

    2012-11-01

    There has been a considerable interest recently in the topic of renewable energy. This is primarily due to concerns about environmental impacts of fossil fuels. Moreover, fluctuating and rising oil prices, increase in demand, supply uncertainties and other factors have led to increased calls for alternative energy sources. Small hydropower, among other renewable energy sources, has been evaluated to have adequate development value because it is a clean, renewable and abundant energy resource. In addition, small hydropower has the advantage of low cost development by using rivers, agricultural reservoirs, sewage treatment plants, waterworks and water resources. The main concept of the tubular-type hydro turbine is based on the difference in water pressure levels in pipe lines, where the energy which was initially wasted by using a reducing valve at the pipeline of waterworks, is collected by turbine in the hydro power generator. In this study, in order to acquire the performance data of a pico tubular-type hydro turbine, the output power, head and efficiency characteristics by different runner blade shapes are examined. The pressure and velocity distributions with the variation of guide vane and runner vane angle on turbine performance are investigated by using a commercial CFD code.

  11. Low head hydro market assessment : main report : vol. 1

    International Nuclear Information System (INIS)

    2008-03-01

    Hydroelectric power is a predictable renewable energy source that produces no greenhouse gases (GHGs) and has low maintenance costs. In addition to river resources, low head hydro is available in sluice gates, irrigation canals, drinking water pressure release valves, and municipal wastewater outfalls. Canada's potential for low head hydro has been estimated at 5000 MW at 2000 different sites across the country. Sites of up to 50 MW have been identified in Ontario and Manitoba. This study performed a market assessment on low head hydro developments. Available and emerging technologies for developing low head hydro were identified. The economics of low head hydro in Canada were explored, and barriers to low head hydro development were identified. Strategies to promote low head hydro development were also explored, and the impact of different incentive types on the low head hydropower market were estimated using a simple economic model. It was concluded that a reduced, streamlined, and standardized environmental assessment process will significantly benefit low head hydro development in Canada. 5 refs., 14 tabs., 17 figs

  12. Interconnected hydro-thermal systems - Models, methods, and applications

    DEFF Research Database (Denmark)

    Hindsberger, Magnus

    2003-01-01

    to be performed where the uncertainty of the inflow to the hydro reservoirs is handled endogenously. In this model snow reservoirs have been added in addition to the hydro reservoirs. Using this new approach allows sampling based decomposition algorithms to be used, which have proved to be efficient in solving...

  13. 75 FR 45607 - Application To Export Electric Energy; Manitoba Hydro

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-281-B] Application To Export Electric Energy; Manitoba Hydro AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Manitoba Hydro (Manitoba) has applied to renew its authority to transmit electric energy from the...

  14. The Atlin Hydro Project : generation for generations

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, S. [Atlin Tlingit Development Corp., Atlin, BC (Canada)

    2010-07-01

    This presentation documented the step-by-step process by which the Atlin Hydro Project was developed. The Taku River Tlingit First Nation undertook the Atlin project as part of its vision for responsible resource management, sustainable economic development, and cultural revival. The Atlin Community Energy Plan involved an assessment of electricity demand, a 20-year demand projection, energy efficiency recommendations, and an assessment of power supply options such as wind towers, connection to the Yukon power grid, and hydro. The potential impact on fisheries, hydrology, wildlife habitat, roads and bridges, navigable waters and forests, existing rights, and First Nation archaeology were assessed, along with other factors such as hazards and flood control. A hydrology assessment of the Surprise-Pine Drainage Basin was undertaken, and stream-flow measurements were taken near the intake location on Pine Creek. The project comprises a discharge control structure and a fish ladder; an intake and weir on Pine Creek; a penstock pipeline from intake to powerhouse; a powerhouse with a 2.1 MW Pelton turbine generator and a switch yard; and a power line from the powerhouse to the interconnection with the existing grid. The impacts on fisheries, wildlife, and human movement are expected to be minimal. 28 figs., 3 tabs.

  15. Ontario hydro waste storage concepts and facilities

    International Nuclear Information System (INIS)

    Carter, T.J.; Mentes, G.A.

    1976-01-01

    Ontario Hydro presently operates 2,200 MWe of CANDU heavy water reactors with a further 11,000 MWe under design or construction. The annual quantities of low and medium level solid wastes expected to be produced at these stations are tabulated. In order to manage these wastes, Ontario Hydro established a Radioactive Waste Operations Site within the Bruce Nuclear Power Development located on Lake Huron about 250 km northwest of Toronto. The Waste Operations Site includes a 19-acre Storage Site plus a Radioactive Waste Volume Reduction Facility consisting of an incinerator and waste compactor. Ontario has in use or under construction both in-ground and above-ground storage facilities. In-ground facilities have been used for a number of years while the above-ground facilities are a more recent approach. Water, either in the form of precipitation, surface or subsurface water, presents the greatest concern with respect to confinement integrity and safe waste handling and storage operations

  16. B.C. Hydro drops Duke Point

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    The abandonment of the proposed natural gas-fired Duke Point Power Project on Vancouver Island was discussed. It was suggested that the continuing appeal process increases the risk that the plant will not be built in time. The news followed a decision by the British Columbia (BC) Court of Appeal to hear an appeal of the project by a number of intervenors. Over $170 million has been spent on the project to date. The decision will impact the BC treasury, as the amount is being deducted from the dividends that BC Hydro would have paid to the government. A coalition of individuals and environmental groups, as well as local industry, are opposed to the plant on the basis of increased greenhouse (GHG) emissions and higher natural gas prices. The project would have required a natural gas pipeline to be built under Georgia Strait. The project was thought necessary due to the deteriorating condition of high voltage direct current cables running under the strait. BC Hydro's fallback plan for the island is load reduction. A new transmission line is also planned

  17. Hydro-Quebec and energy efficiency

    International Nuclear Information System (INIS)

    1990-01-01

    There is growing awareness that energy efficiency is both profitable and environmentally beneficial. In this year's Development Plan, Hydro-Quebec is proposing an Energy Efficiency Project made up of marketing programs designed for all markets throughout the final decade of the 20th century. This Project will have two aspects: energy efficiency and consumption management. Hydro-Quebec aims to reach an energy-efficiency level of 12.9 terawatt hours per year by 1999, fully 55% of its 23-terawatt hour potential. Over the next 10 years the utility intends to spend $1.8 billion for this purpose. Cumulative anticipated energy savings should be in the vicinity of 70 terawatt hours for the coming decade, and more than 130 terawatt hours for the first decade of the next century. Of the overall goal of 12.9 terawatt hours for Horizon 1999, energy savings of 9.0 terawatt hours should be the direct result of this year's proposed marketing programs, and will account for the bulk of anticipated investments. The remaining 3.9 terawatt hours will be gained as customers acquire better electrical appliance and accessory (household appliances, home insulation) buying habits

  18. Cutting Classes

    Science.gov (United States)

    Hacker, Andrew

    1976-01-01

    Provides critical reviews of three books, "The Political Economy of Social Class", "Ethnicity: Theory and Experience," and "Ethnicity in the United States," focusing on the political economy of social class and ethnicity. (Author/AM)

  19. Wound bed preparation: A novel approach using HydroTherapy.

    Science.gov (United States)

    Atkin, Leanne; Ousey, Karen

    2016-12-01

    Wounds that fail to heal quickly are often encountered by community nursing staff. An important step in assisting these chronic or stalled wounds progress through healing is debridement to remove devitalised tissue, including slough and eschar, that can prevent the wound from healing. A unique wound treatment called HydroTherapy aims to provide an optimal healing environment. The first step of HydroTherapy involves HydroClean plus™, this dressing enables removal of devitalised tissue through autolytic debridement and absorption of wound fluid. Irrigation and cleansing provided by Ringer's solution from the dressing further removes any necrotic tissue or eschar. Once effective wound bed preparation has been achieved a second dressing, HydroTac™, provides an ongoing hydrated wound environment that enables re-epithelialisation to occur in an unrestricted fashion. This paper presents 3 case studies of slow healing wounds treated with HydroClean plus™ which demonstrates effective wound debridement.

  20. Estimation of the resource for small, mini and micro hydro-energy: Applications in Mexico. First part: Estimation of the Resource (Annexe 8 in 'A vision of year 2030 on the use of the renewable energies in Mexico'); Estimacion del recurso para pequena, mini y micro hidroenergia: Aplicaciones en Mexico. Primera parte: Estimacion del Recurso (Anexo 8 en 'Una vision al 2030 de la utilizacion de las energias renovables en Mexico')

    Energy Technology Data Exchange (ETDEWEB)

    Valdez Ingenieros, S.A. de C.V. [Cuernavaca, Morelos (Mexico)

    2005-08-15

    In this document a discussion is presented on the potential denominated small, mini or micro-hydraulic whereupon counts the country with the intention of coming to its development or operation. The use of hydro-energy in small scale is possible as much as for the auto-industrial supply as for productive activities in rural areas. Comments also made on the uncertainties of its assessment and the way it considers to follow to continue with the works that take to conclude at 100% the assessment of the national potential in the near future, since apparently in Mexico a little more of 2% of such potential has been only developed. One knows that in other countries in the last ten years, an accelerated development of this power source with satisfactory results has been obtained. [Spanish] En este documento se presenta una discusion sobre el potencial denominado pequeno, mini o micro hidraulico con que cuenta el pais con el objeto de proceder a su desarrollo o explotacion. El uso de la hidroenergia en pequena escala es posible tanto para el auto abasto industrial como para actividades productivas en el medio rural. Se comenta tambien sobre las incertidumbres de su determinacion y se plantea el camino a seguir para continuar con los trabajos que lleven a concluir al 100% la determinacion del potencial nacional en el futuro cercano, ya que al parecer en Mexico solo se ha desarrollado un poco mas del 2% de dicho potencial. Se sabe que en otros paises en los ultimos diez anos, se ha logrado un acelerado desarrollo de esta fuente energetica con resultados satisfactorios.

  1. Estimation of the resource for small, mini and micro hydro-energy: Applications in Mexico. First part: Estimation of the Resource (Annexe 8 in 'A vision of year 2030 on the use of the renewable energies in Mexico'); Estimacion del recurso para pequena, mini y micro hidroenergia: Aplicaciones en Mexico. Primera parte: Estimacion del Recurso (Anexo 8 en 'Una vision al 2030 de la utilizacion de las energias renovables en Mexico')

    Energy Technology Data Exchange (ETDEWEB)

    Valdez Ingenieros, S.A. de C.V. [Cuernavaca, Morelos (Mexico)

    2005-08-15

    In this document a discussion is presented on the potential denominated small, mini or micro-hydraulic whereupon counts the country with the intention of coming to its development or operation. The use of hydro-energy in small scale is possible as much as for the auto-industrial supply as for productive activities in rural areas. Comments also made on the uncertainties of its assessment and the way it considers to follow to continue with the works that take to conclude at 100% the assessment of the national potential in the near future, since apparently in Mexico a little more of 2% of such potential has been only developed. One knows that in other countries in the last ten years, an accelerated development of this power source with satisfactory results has been obtained. [Spanish] En este documento se presenta una discusion sobre el potencial denominado pequeno, mini o micro hidraulico con que cuenta el pais con el objeto de proceder a su desarrollo o explotacion. El uso de la hidroenergia en pequena escala es posible tanto para el auto abasto industrial como para actividades productivas en el medio rural. Se comenta tambien sobre las incertidumbres de su determinacion y se plantea el camino a seguir para continuar con los trabajos que lleven a concluir al 100% la determinacion del potencial nacional en el futuro cercano, ya que al parecer en Mexico solo se ha desarrollado un poco mas del 2% de dicho potencial. Se sabe que en otros paises en los ultimos diez anos, se ha logrado un acelerado desarrollo de esta fuente energetica con resultados satisfactorios.

  2. Sinkhole investigated at B.C. Hydro`s Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1996-07-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro`s W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig.

  3. Architecture at Hydro-Quebec. L'architecture a Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  4. Development and applications of reactor noise analysis at Ontario Hydro`s CANDU reactors

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckler, O [Ontario Hydro, Toronto, ON (Canada); Tulett, M V [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station

    1996-12-31

    In 1992 a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro`s CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. The dynamic characteristics of critical plant components, instrumentation and processes are monitored on a regular basis. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes induced by moderator flow, (6) estimating the dynamics and response time of RTD (Resistance Temperature Detector) temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (10) detecting coolant boiling in fully instrumented fuel channels, (11) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as-needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology. (author

  5. The dual hydro x nuclear power plants

    International Nuclear Information System (INIS)

    Borges, J.C.

    1984-01-01

    An our daily life in modern society becomes more and more dependent on electricity, supply of this kind of energy should not only be a part of a global energy policy, but also lay down rigorous criteria to garanty the market supply. Planning actions of the electrical sector are more sensitive to unforseen events, either to brief interruptions in energy supply or to non-equilibrium at any time of the excess of supply over demand. In this way, the cost factor although basic, does not lead to optimal solutions in decisions which involve options between different technologies and energy sources to generate electricity. In this paper, we analyse the above situation in the case of deciding between utilization of nuclear or hydro power plants to supply the Brazilian demande for electricity. Our final objective was the search for parameters which could lead us to better identify and understand the adroitness and mistakes of the Brazilian Nuclear Program. (Author) [pt

  6. Ontario Hydro nuclear - challenges of the future

    International Nuclear Information System (INIS)

    Field, R.

    1996-01-01

    The challenges facing Ontario Hydro Nuclear (OHN), as understood at the time of the conference, are discussed. OHN had many strengths to build on in preparing for the competition ahead, including: extremely competitive production costs, strong technical capabilities, advantages of multiple units, environmental advantages favoring nuclear, strong public support, and improving station performance. Even with these advantages, OHN faced the difficult challenge of improving overall performance in the face of a large debt burden, coupled with the reinvestment demands of aging units at Pickering A and Bruce A. At the time of the conference, Bruce 2 had already been shut down, because the cost of retubing it and replacing its boilers could not be justified. The ''drive to nuclear excellence'' involves the simultaneous achievement of top performance in safety, reliability and cost; and to this end, changes were being made to reverse the trends indicated by disappointing ''peer reviews''

  7. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  8. The Manitoba Hydro-Electric Board 50. annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This document presents the financial statements for The Manitoba Hydro-Electric Board (Manitoba Hydro) for the fiscal year ended March 31, 2001. Manitoba Hydro was proud to report no electricity rate increase for the period 2000-2001, a feat realized for the fifth consecutive year for most customer groups. Financial and production highlights were first presented, followed by the vision mission and goals of Manitoba Hydro. Manitoba Hydro serves 403 000 customers in the province with electric energy, and 248 000 customers with natural gas service mainly in the south of the province. Electricity export sale agreements are in place with more than 35 utilities and marketers in the United States, Ontario and Saskatchewan. Self-renewing waterpower is used to generate the bulk of the electricity. The transmission and distribution lines stretch over 100 000 kilometres. Manitoba Hydro is the fourth largest energy utility in Canada based on capital assets. A review of the year was presented, as well as a brief historical overview of Manitoba Hydro. The financial review section discussed the management report, the Auditor's report. Included in this section were various statement sheets, namely the consolidated statement of income and retained earnings, consolidated balance sheet, consolidated statement of cash flows, followed by some notes to the consolidated financial statements. Consolidated financial statistics and operating statistics - 10-year overview were presented. A brief presentation of the Board members and senior officers ended this report. tabs. figs.

  9. The Manitoba Hydro-Electric Board 50. annual report

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the financial statements for The Manitoba Hydro-Electric Board (Manitoba Hydro) for the fiscal year ended March 31, 2001. Manitoba Hydro was proud to report no electricity rate increase for the period 2000-2001, a feat realized for the fifth consecutive year for most customer groups. Financial and production highlights were first presented, followed by the vision mission and goals of Manitoba Hydro. Manitoba Hydro serves 403 000 customers in the province with electric energy, and 248 000 customers with natural gas service mainly in the south of the province. Electricity export sale agreements are in place with more than 35 utilities and marketers in the United States, Ontario and Saskatchewan. Self-renewing waterpower is used to generate the bulk of the electricity. The transmission and distribution lines stretch over 100 000 kilometres. Manitoba Hydro is the fourth largest energy utility in Canada based on capital assets. A review of the year was presented, as well as a brief historical overview of Manitoba Hydro. The financial review section discussed the management report, the Auditor's report. Included in this section were various statement sheets, namely the consolidated statement of income and retained earnings, consolidated balance sheet, consolidated statement of cash flows, followed by some notes to the consolidated financial statements. Consolidated financial statistics and operating statistics - 10-year overview were presented. A brief presentation of the Board members and senior officers ended this report. tabs. figs

  10. Innovative private micro-hydro power development in Rwanda

    International Nuclear Information System (INIS)

    Pigaht, Maurice; Plas, Robert J. van der

    2009-01-01

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (i) institutional arrangements rather than technical quality determine the success of such projects; (ii) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (iii) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too.

  11. Innovative private micro-hydro power development in Rwanda

    Energy Technology Data Exchange (ETDEWEB)

    Pigaht, Maurice; Van der Plas, Robert J. [MARGE-Netherlands, Brem 68, 7577 EW Oldenzaal (Netherlands)

    2009-11-15

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (1) institutional arrangements rather than technical quality determine the success of such projects; (2) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (3) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too. (author)

  12. Multifractal Conceptualisation of Hydro-Meteorological Extremes

    Science.gov (United States)

    Tchiguirinskaia, I.; Schertzer, D.; Lovejoy, S.

    2009-04-01

    Hydrology and more generally sciences involved in water resources management, technological or operational developments face a fundamental difficulty: the extreme variability of hydro-meteorological fields. It clearly appears today that this variability is a function of the observation scale and yield hydro-meteorological hazards. Throughout the world, the development of multifractal theory offers new techniques for handling such non-classical variability over wide ranges of time and space scales. The resulting stochastic simulations with a very limited number of parameters well reproduce the long range dependencies and the clustering of rainfall extremes often yielding fat tailed (i.e., an algebraic type) probability distributions. The goal of this work was to investigate the ability of using very short or incomplete data records for reliable statistical predictions of the extremes. In particular we discuss how to evaluate the uncertainty in the empirical or semi-analytical multifractal outcomes. We consider three main aspects of the evaluation, such as the scaling adequacy, the multifractal parameter estimation error and the quantile estimation error. We first use the multiplicative cascade model to generate long series of multifractal data. The simulated samples had to cover the range of the universal multifractal parameters widely available in the scientific literature for the rainfall and river discharges. Using these long multifractal series and their sub-samples, we defined a metric for parameter estimation error. Then using the sets of estimated parameters, we obtained the quantile values for a range of excedance probabilities from 5% to 0.01%. Plotting the error bars on a quantile plot enable an approximation of confidence intervals that would be particularly important for the predictions of multifractal extremes. We finally illustrate the efficiency of such concept on its application to a large database (more than 16000 selected stations over USA and

  13. Hydro-Quebec annual report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    An overview is presented of the activities of Hydro-Quebec for the year ended December 31, 1993, as well as its financial status. Export sales of electricity to other Canadian provinces and the USA are reported. Research programs and demonstration projects are described, as well as the utility's international activities. Environmental and economic considerations for the province are presented. Financial data includes total sales, sales by sector, export sales, and rate changes. A financial statement is included. In 1993, total sales volume was 152.1 TWh, or 7.5 TWh more than in 1992, for a total sales revenue of $7,004 million, an increase of 3.5% over 1992. Sales in Quebec increased 5 TWh, with nearly all of this increase coming from the industrial sector. Exports outside of Quebec totalled 15 TWh, or 20% more than in 1992. The largest increase in exports was in the form of short-term sales to the USA. Expenditures in 1993 were $3,761 million, only slightly more than in 1992. Facilities commissioned in 1993 included the Brisay power plant, two of six units at the Laforge-1 plant, and the north portion of the 12th transmission line from the LaGrande complex. Total installed capacity of the Hydro-Quebec system reached 29,131 MW, and total power produced was 131.6 TWh. Total length of transmission and distribution lines in 1993 reached 29,869 km and 100,908 km respectively. 9 figs., 17 tabs

  14. Implementation of an Automatic System for the Monitoring of Start-up and Operating Regimes of the Cooling Water Installations of a Hydro Generator

    Directory of Open Access Journals (Sweden)

    Ioan Pădureanu

    2015-07-01

    Full Text Available The safe operation of a hydro generator depends on its thermal regime, the basic conditions being that the temperature in the stator winding fall within the limits of the insulation class. As the losses in copper depend on the square current in the stator winding, it is necessary that the cooling water debit should be adapted to the values of these losses, so that the winding temperature falls within the range of the values prescribed in the specifications. This paper presents an efficient solution of commanding and monitoring the water cooling installations of two high-power hydro generators.

  15. Hydro-Quebec 2005 annual report : people with energy

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec generates, transmits and distributes electricity mainly produced by renewable energy sources. Its sole shareholder is the Quebec government. This annual report reviewed the operations of Hydro-Quebec, and provided data on energy sales, production and details of the utility's environmental programs. Information on Hydro-Quebec subsidiaries in 2005 was presented in the following separate sections: Hydro-Quebec Production; Hydro-Quebec TransEnergie; Hydro-Quebec Distribution; Hydro-Quebec Equipement; and the Societe d'energie de la Baie James. In 2005, Hydro-Quebec Distribution signed contracts for an initial block of 990 MW of wind power and issued a tender call for an additional 2000 MW of wind power. A generator balancing service was created and authorized by the Regie de l'energie. Hydro-Quebec customers have achieved energy savings of nearly 450 GWh in 2005. The commissioning of Toulnustouc generating station was achieved 5 months ahead of schedule. The 526 MW facility will generate 2.7 TWh annually. Work at the Chute-Allard and Rapide-des-Coeurs sites has continued, as well as construction at Mercier and Peribonka and Eastmain-1. Income from continuing operations came to $2.25 billion, a $124 million increase that was attributed to a rise in domestic sales and net short-term exports. The income was offset by higher pension expenses, depreciation and amortization, as well as by cost of supply on external markets and financial expenses. All other operating expenses were lower than in 2004. Capital spending for the transmission system reached its highest level since 1997, with $793 million invested, including $336 million to meet growth. Data on the company's financial performance, executive changes and reorganization were provided. Financial statements included a review and analysis of financial transactions, an auditor's report, as well as customary notes to the consolidated financial statement including balance sheets, assets, liabilities and

  16. Joint atmospheric-terrestrial water balances for East Africa: a WRF-Hydro case study for the upper Tana River basin

    Science.gov (United States)

    Kerandi, Noah; Arnault, Joel; Laux, Patrick; Wagner, Sven; Kitheka, Johnson; Kunstmann, Harald

    2018-02-01

    For an improved understanding of the hydrometeorological conditions of the Tana River basin of Kenya, East Africa, its joint atmospheric-terrestrial water balances are investigated. This is achieved through the application of the Weather Research and Forecasting (WRF) and the fully coupled WRF-Hydro modeling system over the Mathioya-Sagana subcatchment (3279 km2) and its surroundings in the upper Tana River basin for 4 years (2011-2014). The model setup consists of an outer domain at 25 km (East Africa) and an inner one at 5-km (Mathioya-Sagana subcatchment) horizontal resolution. The WRF-Hydro inner domain is enhanced with hydrological routing at 500-m horizontal resolution. The results from the fully coupled modeling system are compared to those of the WRF-only model. The coupled WRF-Hydro slightly reduces precipitation, evapotranspiration, and the soil water storage but increases runoff. The total precipitation from March to May and October to December for WRF-only (974 mm/year) and coupled WRF-Hydro (940 mm/year) is closer to that derived from the Climate Hazards Group Infrared Precipitation with Stations (CHIRPS) data (989 mm/year) than from the TRMM (795 mm/year) precipitation product. The coupled WRF-Hydro-accumulated discharge (323 mm/year) is close to that observed (333 mm/year). However, the coupled WRF-Hydro underestimates the observed peak flows registering low but acceptable NSE (0.02) and RSR (0.99) at daily time step. The precipitation recycling and efficiency measures between WRF-only and coupled WRF-Hydro are very close and small. This suggests that most of precipitation in the region comes from moisture advection from the outside of the analysis domain, indicating a minor impact of potential land-precipitation feedback mechanisms in this case. The coupled WRF-Hydro nonetheless serves as a tool in quantifying the atmospheric-terrestrial water balance in this region.

  17. A Linked Hydro-Economic Model to Examine the Effects of Water Policy on Rural Poverty

    Science.gov (United States)

    Maneta, M. P.; Torres, M.; Vosti, S. A.; Wallender, W. W.; Howitt, R.; Rodrigues, L. N.; Bassoi, L. H.; Pfeiffer, L.; Young, J.

    2006-12-01

    The sustainable intensification of small-scale agriculture is a necessary condition for reducing rural poverty in developing countries. Increasing the amount of irrigated cropland and the economic efficiency of irrigation are two key components of most intensification strategies. Improved access to water generally increases farm income but richer farmers use a disproportionate share of the available water, decreasing the chances of poor farmers to meet their water needs. Furthermore, water and poverty have strong spatial components that have so far been neglected in water planning. In that sense, too little is known about the short and long term hydrological effects, especially the externality effects of changes in on-farm water use and its implications to nearby farmers. To address this gap in knowledge, a spatially distributed and transient description of changes in surface and groundwater allocation under different agricultural management scenarios is needed. We propose a hydro-economic model providing a realistic spatio-temporal description of the linkages between the economic and hydrologic subsystems. This hydro-economic model is composed of a basin-level 3D spatially distributed transient hydrologic model (MOD-HMS) and a farm-level, spatially distributed agricultural production model. Both models are explicitly linked through the boundary conditions of the hydrologic model. The linkage will account for the spatial and temporal impact of different crop mixes, irrigation techniques and groundwater pumpage on water availability at farm level to assess the effects of policy action on the hydro-economic components of the system.

  18. Preliminary study for a drinking-water hydro-power station in Raron, Switzerland; Vorstudie Trinkwasserkraftwerk 'Moos', Gemeinde Raron VS

    Energy Technology Data Exchange (ETDEWEB)

    Loretan, F. [Schneider - Bregy und Partner AG, Raron, (Switzerland); Hiller, B. [Ryser Ingenieure AG, Berne (Switzerland)

    2006-07-01

    This final report for the Small Hydro Programme of the Swiss Federal Office of Energy (SFOE) presents the concept for the augmentation of an existing drinking-water-powered small hydro-electric project with an additional installation that is to use the overflow-water of a reservoir to drive a 75 kW Pelton turbine. The paper discusses the hydraulic situation and describes the installations proposed. Energy production and the costs involved are listed and commented on. Water in drinking-water quality from the Loetschberg railway tunnel is also to be used in the system.

  19. Valuing hydrological forecasts for a pumped storage assisted hydro facility

    Science.gov (United States)

    Zhao, Guangzhi; Davison, Matt

    2009-07-01

    SummaryThis paper estimates the value of a perfectly accurate short-term hydrological forecast to the operator of a hydro electricity generating facility which can sell its power at time varying but predictable prices. The expected value of a less accurate forecast will be smaller. We assume a simple random model for water inflows and that the costs of operating the facility, including water charges, will be the same whether or not its operator has inflow forecasts. Thus, the improvement in value from better hydrological prediction results from the increased ability of the forecast using facility to sell its power at high prices. The value of the forecast is therefore the difference between the sales of a facility operated over some time horizon with a perfect forecast, and the sales of a similar facility operated over the same time horizon with similar water inflows which, though governed by the same random model, cannot be forecast. This paper shows that the value of the forecast is an increasing function of the inflow process variance and quantifies how much the value of this perfect forecast increases with the variance of the water inflow process. Because the lifetime of hydroelectric facilities is long, the small increase observed here can lead to an increase in the profitability of hydropower investments.

  20. Influence of individual and social contextual factors on changes in leisure-time physical activity in working-class populations: results of the Healthy Directions–Small Businesses Study

    Science.gov (United States)

    Stoddard, Anne; Bennett, Gary G.; Wolin, Kathleen Y.; Sorensen, Glorian G.

    2012-01-01

    Background As part of the Harvard Cancer Prevention Program Project, we sought to address disparities reflected in social class and race/ethnicity by developing and testing a behavioral intervention model that targeted fruit and vegetable consumption, red meat consumption, multivitamin intake, and physical activity in working-class, multiethnic populations. Methods This paper examined the associations between change in leisure-time physical activity and individual and social contextual factors in participants employed in small businesses (n = 850) at both baseline and at 18-month final. Results In bivariate analyses, age, language acculturation, social ties, and workplace social capital were significantly associated with physical activity at final. In multivariable analyses, being younger and having high language acculturation were significantly associated with greater leisuretime physical activity at final; high workplace social capital was significantly associated with a decline in physical activity at final. Conclusion These findings have implications for understanding factors that are integral to promoting change in physical activity among working-class, multiethnic populations. PMID:22806257

  1. Times are changing, Hydro-Quebec multiplies its assets

    International Nuclear Information System (INIS)

    Lefevre, M.

    1997-01-01

    Hydro-Quebec''s advance into the North American and world multi-energy market began with the purchase of an interest in the natural gas holding company Noverco, a commercial partnership with Gaz de France, and marketing agreements with Enron and Trigen in the United States. Hydro-Quebec, the world''s sixth largest electric utility, aims to become a multi-energy enterprise selling not only electricity, but also natural gas, oil and certain renewable forms of energy. Currently, Hydro-Quebec is licensed to make border sales of electricity at regulated prices. Through the US Federal Energy Regulatory Commission (FERC), Hydro-Quebec will be able also to sell electricity through wholesale spot contracts with electricity marketers such as Trigen and Enron

  2. Full cost accounting for decision making at Ontario Hydro

    International Nuclear Information System (INIS)

    Plagiannakos, T.

    1996-01-01

    Ontario Hydro's approach to full cost accounting (FCA) was outlined in response to questions raised earlier, in another forum, regarding Ontario Hydro's views on FCA. FCA was defined as an evaluation framework (as opposed to an accounting system) which tries to account for the internal (private) as well as the external (environment and human health) costs and benefits and integrate them into business decisions. When the external impacts cannot be monetized, qualitative evaluations are used based on the damage costing approach, which Ontario Hydro prefers to the cost of control method recommended by its critics. In general, however, Ontario Hydro is not opposed to FCA in so far as it puts the Utility in a better position to make more informed decisions, improve environmental cost management, avoid future costs, enhance revenue, improve environmental quality, contribute to environmental policy, and contribute to sustainable development. 1 fig

  3. Pumped Storage Hydro Power Plant Cierny Vah

    International Nuclear Information System (INIS)

    Regula, E.

    1998-01-01

    In this leaflet the pump-storage power plant Cierny Vah is presented. A Cierny Vah pumped storage power plant (PSP) has been designed and built for providing the reliable and quality electric energy supply and for covering load changes of an electrification system. (ES). It is mainly the pumped storage hydro power plants plants which in our conditions are the sources operatively covering the sudden changes of the ES load from the ecological, economic but mainly from the operational point of view. The electric energy generation volume is not the primary standpoint but especially their control functions in the ES. During the building of the Cierny Vah PSP the peak operation with the daily accumulation, participation in frequency control and output in ES and the compensation function in ES were to be its main tasks. After putting it into operation by especially after its becoming independent of the Slovak ES in 1994 the static functions (energy generation from pumping, balance output reserves, daily control, ...) gave way to dynamic functions which gained greater importance. After interconnection of the ES with the UCPTE West European Association in which there are besides other things, the strict criteria for observing balance outputs, the main functions of PSPs are as follows: (1) Dynamic services for ES; (2) Dispatching reserve for the fall out of the greatest ES block; (3) Observing the foreign cooperation balance agreed; (4) Compensation of peaks and also of sudden daily load diagram reductions. Technical parameters of the upper and lower reservoir are described. The hydro power plant is a body lower reservoir. In it there are six vertical pumping aggregates in the three machine layout: the motor-generator - the turbine - the pump. Between the turbine and the pump there is a hydraulically controlled claw clutch engaging at rest and disengaging also during the aggregate operation. During pumping air is involved inside the turbine. The Francis turbines have a

  4. Hydro-Quebec strategic plan 2006-2010

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec produces, transmits and distributes electricity through the use of renewable energy sources, particularly hydroelectricity. It also conducts research in energy related fields. This document listed the strategic plan for Hydro-Quebec's 4 main divisions: Hydro-Quebec Production, Hydro-Quebec TransEnergie, Hydro-Quebec Distribution and Hydro-Quebec Energy Society of Bay James. The 2006 to 2010 strategic plan continues to focus on 3 main priorities: energy efficiency; complementary development of hydroelectricity and wind power; and, technological innovation. Hydro-Quebec's objectives also include strengthening the security of Quebec's energy supply and making use of energy as a lever for economic development. The plan for Hydro-Quebec Production calls for accelerating the development of major hydroelectric projects and promoting other renewable forms of energy such as wind power and ensuring the efficiency and reliability of the generating fleet. The utility's objective is to reach 4.7 TWh in energy savings by 2010 and to work toward a target of 8 TWh by 2015. The plan also involves a portfolio of hydroelectric projects totaling 5,400 MW. The plan includes complementary development and integration of 4,000 MW of windpower by 2015. The plan for Hydro-Quebec TransEnergie calls for system reliability and becoming a world benchmark for quality and reliability in wind power integration and deployment of new technologies to enhance performance. The plan for Hydro-Quebec Distribution calls for more efficient use of electricity, increase customer satisfaction and meet electricity needs through the use of renewable energy sources. The utility has made a commitment for 2006 to 2010 to a net income of $2.5 billion per year for a total of $12.5 billion, and a capital investment of 19.4 billion. This paper outlined the contribution of each division to net income and listed the economic benefits for the 2006 to 2010 period. In 2006, the Quebec Energy Board authorized

  5. Expanding Canadian renewable and conservation expenses class 43.1 to include solar

    International Nuclear Information System (INIS)

    2005-01-01

    Class 43.1 is a tax measure that allows for accelerated write-offs of renewable energy products for business use. Technologies that are included in the class for accelerated write off include renewable energy sources such as wind, small hydro, geo-thermal, fuel cells, bio-gas, cogeneration systems, and district heating and solar. In 2005, the federal budget announced 2 changes to class 43.1 The write off rate has been increased from 30 per cent to 50 per cent. This change would reduce the effective cost of solar energy for business owners. The class has also been extended to include distribution assets for district energy assets and biogas equipment. However, no changes to the restrictions for solar were announced. The Canadian Solar Industries Association (CanSIA) argues that class 43.1 currently does not help the solar industries, nor do the proposed changes solve this situation. The restrictions placed on solar eliminate about 90 per cent of the industrial applications for solar that class 43.1 should support. Class 43.1 currently covers only 1 per cent of photovoltaic applications, 2 per cent of solar hot water applications, and 9 per cent of solar air heating applications. CanSIA claims that an increase in tax write-offs for photovoltaic systems, solar hot water, and solar air heating would help increase the solar market from 1,060 kW to a market size of 11,600 kW. CanSIA has made recommendations to the federal government to remove the size restrictions for PV systems and to remove the restrictions on applications for solar thermal systems. 2 tabs

  6. Pico hydro turbines for electricity in rural areas

    OpenAIRE

    Descotte, Gérard

    2016-01-01

    This article discusses the feedback and lessons learned, particularly from a survey carried out following the deployment program of a pico hydro power solution in a very isolated rural area in north Laos. This project is part of the strategic development for the rural electrification of Laos, in which pico hydro power facilities constitute the main avenue of progress for the electrification of isolated villages.

  7. BLUE GOLD: HYDRO-ELECTRIC RENT IN CANADA

    OpenAIRE

    Glenn Jenkins; RICHARD ZUKER

    1984-01-01

    In this study, an attempt is made to develop estimates of the value of economic rent from production of hydro-electricity. These estimates are made for the year 1979, which is the latest period for which a comprehensive set of data was available at the time this work was undertaken. The estimates are developed for the hydro-electricity generated (or used) by electric utilities in four provinces: Quebec (including Churchill Falls), Ontario, Manitoba and British Columbia. These electric systems...

  8. New directions in nuclear waste disposal in Ontario Hydro

    International Nuclear Information System (INIS)

    Nash, K.

    1996-01-01

    Ontario Hydro Nuclear has financial, environmental, safety and public acceptance business objectives which must be met to achieve long term sustainable success. Short term objectives of achieving nuclear excellence in safety, cost and production are vital to this success. Ontario Hydro's nuclear waste and decommissioning liabilities must be managed within these objectives. This paper outlines the financial environmental and societal considerations and responsibility framework for managing these liabilities. (author)

  9. Reversible pumped hydro - benefits and challenges

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Torbjoern K.; Walseth, Eve C.

    2010-07-01

    Full text: The Norwegian hydro power system is dominated with high head turbines, Pelton and Francis with high capacity in the reservoirs. Originally they were built for secure energy supply. In the system there are also reversible pump turbine (RPT) plants where in times with spare energy, made it possible to pump water from the lower reservoir to the higher. Again the idea was to secure energy supply, which meant pumping in early autumn to fill the reservoirs for winter. In the recent years, a more active use of the RPT plants has been actualized. The free market made price difference between night and day interesting, hence a more frequent pumping was desirable. In the coming years, new-renewable energy sources will utterly enhance a more active use of the RPT plants. More active use of the RPT plants means more frequent starts and stops, both in pumping and in turbine mode. There are a lot of challenges in adopting a new strategy for operating the machinery. More effective start equipment is required. The machinery will be exposed to more frequent dynamic loads; the turbines will be run at part- and full load. The existing RPT plants are connected to huge reservoirs. That means the RPTs are not only for short sighted power regulations, as many RPT-plants in Europe, but are also capable for a substantial energy production. In Norway, the nature is very suitable for RPT plants, both in connection with existing power plants, were reservoirs and conduits are already established, and standing alone with a minimum of energy production. RPTs are, as a design, a compromise between effective generating and stable as well as effective pumping. Stable pumping often results in very steep flow-speed characteristics when operating as a turbine. When dealing with hydraulic transients these characteristics cause a higher change in flow and torque leading to instability during start-up and possible off-design operation point. The instability slows down the synchronization

  10. Production method of hydrogen jet plasma process in hydro machinery

    International Nuclear Information System (INIS)

    Amini, F.

    2007-01-01

    The purpose of present paper is to the process of plasma formation in hydro machinery when a hydro turbine operates at various conditions and load rejection. By investigation the power, shock pressure , and impact effects of hydro machinery, it is revealed that energy and hydrogen are generated by the plasma process. The investigation on several turbines of various hydro power plants reveals that cold fusion process in hydro machinery generates hydrogen. The hypothesis concerning the participation of alkaline metals in river water and the atomic nuclei of the runner blade material in the formation of hydrogen are considered. It is possible to assume hydrogen, deuterium, helium, and tritium atoms (based on Dr. Mizuno and Dr. Kanarev theories) that are formed, diffuse into cavitation bubbles. The plasma is generated during the collapse of the bubble; thus, the quantity of burnt hydrogen determine the volume of generating hydrogen and the impact force caused by hydrogen explosion (noise).There are five main notions, which can determine hydrogen and plasma process: (1) turbine power effect, (2) high shock pressure, (3) crack on turbine parts, (4) impacts effects and (4) the lift of rotating parts. The frequency of the excitation lies in a range from 0.786 to 1.095 Hz.In future, it may be possible to design hydro turbines based on the plasma process that generates hydrogen; or there may exist turbines that rotate with a mixture of hydrogen explosion and water energies

  11. Penstock failure detection system at the 'Valsan' hydro power plant

    International Nuclear Information System (INIS)

    Georgescu, A M; Coşoiu, C I; Alboiu, N; Hlevca, D; Tataroiu, R; Popescu, O

    2012-01-01

    'Valsan' is a small Hydro Power Plant, 5 MW, situated at about 160 km north of Bucharest, Romania, on the small 'Valsan' river in a remote mountainous area. It is equipped with a single Francis turbine. The penstock is located in the access shaft of the HPP. 'Hidroelectrica', the Romanian company that operates the HPP, was trying to implement a remote penstock failure detection system. Starting from a classic hydraulic problem, the authors of the paper derived a method for failure detection and localization on the pipe. The method assumes the existence of 2 flow meters and 2 pressure transducers at the inlet and outlet of the pressurized pipe. Calculations have to be based on experimental values measured in a permanent regime for different values of the flow rate. The method was at first tested on a pipe, in the Hydraulic Laboratory of the Technical University of Civil Engineering Bucharest. Pipe failure was modelled by opening of a valve on a tee branch of the analyzed pipe. Experimental results were found to be in good agreement with theoretical ones. The penstock of the 'Valsan' HPP, was modelled in EPANET, in order to: i) test the method at a larger scale; ii) get the right flow and pressure transducers that are needed to implement it. At the request of 'Hidroelectrica' a routine that computes the efficiency of the turbine was added to the monitoring software. After the system was implemented, another series of measurements were performed at the site in order to validate it. Failure was modelled by opening an existing valve on a branch of the penstock. Detection of the failure was correct and almost instantaneous, while failure location was accurate within 5% of the total penstock length.

  12. Penstock failure detection system at the "Valsan" hydro power plant

    Science.gov (United States)

    Georgescu, A. M.; Coşoiu, C. I.; Alboiu, N.; Hlevca, D.; Tataroiu, R.; Popescu, O.

    2012-11-01

    "Valsan" is a small Hydro Power Plant, 5 MW, situated at about 160 km north of Bucharest, Romania, on the small "Valsan" river in a remote mountainous area. It is equipped with a single Francis turbine. The penstock is located in the access shaft of the HPP. "Hidroelectrica", the Romanian company that operates the HPP, was trying to implement a remote penstock failure detection system. Starting from a classic hydraulic problem, the authors of the paper derived a method for failure detection and localization on the pipe. The method assumes the existence of 2 flow meters and 2 pressure transducers at the inlet and outlet of the pressurized pipe. Calculations have to be based on experimental values measured in a permanent regime for different values of the flow rate. The method was at first tested on a pipe, in the Hydraulic Laboratory of the Technical University of Civil Engineering Bucharest. Pipe failure was modelled by opening of a valve on a tee branch of the analyzed pipe. Experimental results were found to be in good agreement with theoretical ones. The penstock of the "Valsan" HPP, was modelled in EPANET, in order to: i) test the method at a larger scale; ii) get the right flow and pressure transducers that are needed to implement it. At the request of "Hidroelectrica" a routine that computes the efficiency of the turbine was added to the monitoring software. After the system was implemented, another series of measurements were performed at the site in order to validate it. Failure was modelled by opening an existing valve on a branch of the penstock. Detection of the failure was correct and almost instantaneous, while failure location was accurate within 5% of the total penstock length.

  13. South Louisiana Enhanced Oil Recovery/Sequestration R&D Project Small Scale Field Tests of Geologic Reservoir Classes for Geologic Storage

    Energy Technology Data Exchange (ETDEWEB)

    Hite, Roger [Blackhorse Energy LLC, Houston, TX (United States)

    2016-10-01

    The project site is located in Livingston Parish, Louisiana, approximately 26 miles due east of Baton Rouge. This project proposed to evaluate an early Eocene-aged Wilcox oil reservoir for permanent storage of CO2. Blackhorse Energy, LLC planned to conduct a parallel CO2 oil recovery project in the First Wilcox Sand. The primary focus of this project was to examine and prove the suitability of South Louisiana geologic formations for large-scale geologic sequestration of CO2 in association with enhanced oil recovery applications. This was to be accomplished through the focused demonstration of small-scale, permanent storage of CO2 in the First Wilcox Sand. The project was terminated at the request of Blackhorse Energy LLC on October 22, 2014.

  14. Environmental flows in hydro-economic models

    Science.gov (United States)

    Pereau, Jean-Christophe; Pryet, Alexandre

    2018-03-01

    The protection of environmental flows, as a management objective for a regulating agency, needs to be consistent with the aquifer water balance and the degree of resource renewability. A stylized hydro-economic model is used where natural recharge, which sustains environmental flows, is considered both in the aquifer water budget and in the welfare function as ecosystem damage. Groundwater recharge and the associated natural drainage may be neglected for aquifers containing fossil water, where the groundwater is mined. However, when dealing with an aquifer that constitutes a renewable resource, for which recharge is not negligible, natural drainage should explicitly appear in the water budget. In doing so, the optimum path of net extraction rate does not necessarily converge to the recharge rate, but depends on the costs associated with ecosystem damages. The optimal paths and equilibrium values for the water volume and water extraction are analytically derived, and numerical simulations based on the Western La Mancha aquifer (southwest Spain) illustrate the theoretical results of the study.

  15. Prepared by Thermal Hydro-decomposition

    Science.gov (United States)

    Prasoetsopha, N.; Pinitsoontorn, S.; Kamwanna, T.; Kurosaki, K.; Ohishi, Y.; Muta, H.; Yamanaka, S.

    2014-06-01

    The polycrystalline samples of Ca3Co4- x Ga x O9+ δ (0 ≤ x ≤ 0.15) were prepared by a simple thermal hydro-decomposition method. The high density ceramics were fabricated using a spark plasma sintering technique. The crystal structure of calcined powders was characterized by x-ray diffraction. The single phase of Ca3Co4- x Ga x O9+ δ was obtained. The scanning electron micrograph illustrated the grain alignment perpendicular to the direction of the pressure in the sintering process. The evidence from x-ray absorption near edge spectra were used to confirm the oxidation state of the Ga dopant. The thermoelectric properties of the misfit-layered of Ca3Co4- x Ga x O9+ δ were investigated. Seebeck coefficient tended to decrease with increasing Ga content due to the hole-doping effect. The electrical resistivity and thermal conductivity were monotonically decreased with increasing Ga content. The Ga doping of x = 0.15 showed the highest power factor of 3.99 × 10-4 W/mK2 at 1,023 K and the lowest thermal conductivity of 1.45 W/mK at 1,073 K. This resulted in the highest ZT of 0.29 at 1,073 K. From the optical absorption spectra, the electronic structure near the Fermi level show no significant change with Ga doping.

  16. User experience with HydroHelp programs

    Energy Technology Data Exchange (ETDEWEB)

    Verner, J.S. [Brookfield Power, Gatineau, PQ (Canada)

    2009-07-01

    Advances in the field of geographical information systems (GIS) have simplified the process of finding suitable sites for new hydroelectric projects. However, estimating the construction cost remains a challenge. The HydroHelp program is a cost evaluation program developed specifically to determine if a project will be economically feasible. The program is made up of 4 programs, depending on the type of turbine suitable for the site. Once a turbine selection is made, users can choose the program according to Kaplan, Impulse or Francis turbines. Users must rely on GIS, since the program requires a thorough understanding of the site geology and topography. Knowledge of hydroelectric plants is also necessary in order to obtain a credible construction cost. This paper demonstrated the capacity and flexibility of the software along with its different functions and available options. A detailed cost breakdown can be obtained along with an energy estimate and project specifications. In addition, the software can be used to optimize the project through different options by changing the facility's layout in terms of the type of dam, spillway, conduit length and diameter, turbine type and flood level. 17 figs.

  17. Post Chernobyl safety review at Ontario Hydro

    International Nuclear Information System (INIS)

    Frescura, G.M.; Luxat, J.C.; Jobe, C.

    1991-01-01

    It is generally recognized that the Chernobyl Unit 4 accident did not reveal any new phenomena which had not been previously identified in safety analyses. However, the accident provided a tragic reminder of the potential consequences of reactivity initiated accidents (RIAs) and stimulated nuclear plant operators to review their safety analyses, operating procedures and various operational and management aspects of nuclear safety. Concerning Ontario Hydro, the review of the accident performed by the corporate body responsible for nuclear safety policy and by the Atomic Energy Control Board (the Regulatory Body) led to a number of specific recommendations for further action by various design, analysis and operation groups. These recommendations are very comprehensive in terms of reactor safety issues considered. The general conclusion of the various studies carried out in response to the recommendations, is that the CANDU safety design and the procedures in place to identify and mitigate the consequences of accidents are adequate. Improvements to the reliability of the Pickering NGSA shutdown system and to some aspects of safety management and staff training, although not essential, are possible and would be pursued. In support of this conclusion, the paper describes some of the studies that were carried out and discusses the findings. The first part of the paper deals with safety design aspects. While the second is concerned with operational aspects

  18. Hydro-Quebec annual report 1995

    International Nuclear Information System (INIS)

    1995-01-01

    Progress in providing services, in financial and human relations management aspects, and future outlook for Hydro-Quebec was summarized in the 1995 annual report. Environmental policy of the Corporation was updated to reflect international concepts of sustainable development and environment management. A program was launched to remove, recycle and eliminate contaminants. Although generating systems will not be expanded between 1997 and the year 2000, existing generating facilities will be revitalized to improve their capacity and performance. As part of aggressive marketing of surplus capacity abroad, the creation during the past year of the first U.S. subsidiary, HQ Energy Services, was announced. Net income for the year was reported at $390 million, decreased by $277 million since 1994, due to financial pressure created by the commissioning of installations, including those at Phase II of the La Grande complex, and the slowdown in electricity sales in Quebec. A net income of close to $500 million was forecast for 1996. To achieve this target the Corporation announced plans to reduce operating expenses, an exercise which will include staff reductions and a wage freeze. tabs., figs

  19. Hydro makes the most of driftwood

    Energy Technology Data Exchange (ETDEWEB)

    Shinjo, Takahisa [Electric Power Development Company, Tokyo (Japan)

    2001-05-01

    The Electric Power Development Company (EPDC), which owns and operates 58 hydro power plants and controls 40 reservoirs, is reaping benefits from the driftwood collected from the reservoirs. Large amounts of driftwood, litter and illegally dumped wastes are removed from the company's reservoirs every year. The driftwood was previously incinerated but a new processing system is now used which is more cost-effective and has less impact on the environment. EPDC has installed carbonisation kilns and chipping systems at a number of its sites. The end-products (charcoal, wood vinegar and chips) are sold to offset the costs of driftwood processing. The properties of driftwood charcoal make it suitable for a number of applications (eg absorption, deodorisation, soil improvement and humidity control), while pulverised charcoal is sold as a fuel, as a deodorant for drinking water and for humidity control sheets. The wood vinegar has been used as a preservative, in insecticides and to promote plant growth. Refining the wood vinegar has allowed EPDC to develop cosmetics and face creams. Chips are sold to a plywood manufacturer or used as an organic fertiliser.

  20. Effect of antenatal education in small classes versus standard auditorium-based lectures on use of pain relief during labour and of obstetric interventions: results from the randomised NEWBORN trial.

    Science.gov (United States)

    Brixval, Carina Sjöberg; Thygesen, Lau Caspar; Axelsen, Solveig Forberg; Gluud, Christian; Winkel, Per; Lindschou, Jane; Weber, Tom; Due, Pernille; Koushede, Vibeke

    2016-06-10

    To examine the effect of an antenatal education programme in small classes versus standard auditorium-based lectures. Randomised trial using random-generated web-based 1:1 allocation. The largest birth site in the Capital Region of Denmark, from August 2012 to May 2014. 1766 pregnant women. Inclusion criteria ≥18 years, pregnant with a single child, and able to speak and understand Danish. Women were enrolled in the trial from 10+0 to 20+0 weeks of gestation. The intervention programme consisted of three times 2.5 hours of antenatal education in small classes (n=6-8 women), and focused on improving information and problem-solving skills for expectant parents in order to ease birth and the transition to parenthood. The control group received standard auditorium-based lectures consisting of two times 2 hours in an auditorium with participation of ∼250 people. The primary trial outcome was use of epidural analgesia. Other types of pain relief and obstetric interventions were analysed as explorative outcomes. There was no statistically significant difference in use of epidural analgesia between participants in the intervention group (30.9%) versus the control group (29.1%), adjusted OR 1.10 (95% CI 0.87 to 1.34). Also, the two groups did not differ regarding other types of pain relief or obstetric interventions. Concomitant birth preparation was common in both groups and highest in the control group, but did not seem to influence our results noticeably. Antenatal education in small groups versus standard auditorium-based lectures did not differ regarding use of epidural analgesia, other pain relief, or obstetric interventions. NCT01672437; Results. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  1. Word classes

    DEFF Research Database (Denmark)

    Rijkhoff, Jan

    2007-01-01

    in grammatical descriptions of some 50 languages, which together constitute a representative sample of the world’s languages (Hengeveld et al. 2004: 529). It appears that there are both quantitative and qualitative differences between word class systems of individual languages. Whereas some languages employ...... a parts-of-speech system that includes the categories Verb, Noun, Adjective and Adverb, other languages may use only a subset of these four lexical categories. Furthermore, quite a few languages have a major word class whose members cannot be classified in terms of the categories Verb – Noun – Adjective...... – Adverb, because they have properties that are strongly associated with at least two of these four traditional word classes (e.g. Adjective and Adverb). Finally, this article discusses some of the ways in which word class distinctions interact with other grammatical domains, such as syntax and morphology....

  2. Ekstraksi Minyak Atsiri Dari Akar Wangi Menggunakan Metode Steam - Hydro distillation dan Hydro distilation dengan Pemanas Microwave

    Directory of Open Access Journals (Sweden)

    Maulana M Al Hanief

    2013-09-01

    Full Text Available Penelitian ini bertujuan untuk memperoleh minyak atsiri dari akar wangi dengan modifikasi metode steam-hydro distillation dan hydro distillation yaitu menggunakan pemanasan microwave kemudian membandingkan hasilnya dengan penelitian sebelumnya. Modifikasi ini diharapkan lebih efisien dalam masalah lama penyulingan dan kualitas serta kuantitas rendemen minyak yang lebih baik dan banyak. Penelitian ini menggunakan dua metode yaitu steam-hydro distillation dan hydro distillation dengan pemanfaatan gelombang mikro. Bahan baku yang digunakan dalam penelitian adalah akar wangi jenis pulus wangi yang tumbuh di Kabupaten Garut, Jawa Barat. Variabel yang digunakan adalah bahan baku yang dicacah dan bahan baku utuh dengan variasi massa bahan 50 gr, 60, gr, 70 gr, 80 gr, dan 90 gr dengan pelarut air sebanyak 450 ml dalam labau distiller berukuran 1000 ml. Lama penyulingan adalah lima jam dengan pengamatan tiap 30 menit serta daya yang digunakan adalah 400 Watt. Analisa terhadap hasil minyak atsiri yang diperoleh antara lain analisa GC-MS, spesific gravity, indeks bias, dan bilangan asam. Hasil dari penelitian ini dibandingkan dengan hasil penelitian terdahulu yang tidak memanfaatkan gelombang mikro. Dari hasil penelitian diperoleh % rendemen kumulatif, sifat fisik, sifat kimia, dan kandungan komponen minyak dari metode steam-hydro distillation lebih baik dibandingkan metode hydro distillation ditandai dengan kuantitas dan kualitas yang sesuai dengan SNI.  Sementara itu jika dibandingkan dengan metode terdahulu dapat disimpulkan bahwa penggunaan gelombang mikro lebih efisien dalam waktu dan kuantitas serta kualitas minyak yang lebih baik dibandingkan tanpa penggunaan gelombang mikro

  3. What type of rural? Assessing the variations in life expectancy at birth at small area-level for a small population province using classes of locally defined settlement types.

    Science.gov (United States)

    Terashima, Mikiko; Read Guernsey, Judith; Andreou, Pantelis

    2014-02-13

    Although efforts have been made to articulate rural-urban health inequalities in recent years, results have been inconsistent due to different geographical scales used in these studies. Small-area level investigations of health inequalities will likely show more detailed pictures of health inequalities among diverse rural communities, but they are difficult to conduct, particularly in a small population region. The objectives of this study were: 1) to compare life expectancy at birth for females and males across small-areas classified by locally defined settlement types for a small province in Canada; 2) to assess whether any of the settlement types explains variations in life expectancy over and above the extent of socioeconomic disadvantage and social isolation; and 3) to examine variations in life expectancies within a (larger) area unit used as the basis of health inequality investigations in previous studies. Seven settlement types were determined for the 'community' units based on population per-kilometre-road density and settlement forms. Mean life expectancies at birth for both genders were compared by settlement type, both for the entire province and within the Halifax Regional Municipality--the province's only census designated metropolitan area, but also contains rural settlements. Linear regression analyses were conducted to assess the statistical associations between life expectancy and the settlement types, adjusting for indicators of community-level deprivation. While types of communities considered as 'rural' generally had lower life expectancy for both genders, the effects of living in any settlement type were attenuated once adjusted for socioeconomic deprivation and social isolation. An exception was the village and settlement cluster type, which had additionally negative effects on health for females. There were some variations observed within the Halifax Regional Municipality, suggesting the importance of further investigating a variety of

  4. A class of vertex-edge-growth small-world network models having scale-free, self-similar and hierarchical characters

    Science.gov (United States)

    Ma, Fei; Su, Jing; Hao, Yongxing; Yao, Bing; Yan, Guanghui

    2018-02-01

    The problem of uncovering the internal operating function of network models is intriguing, demanded and attractive in researches of complex networks. Notice that, in the past two decades, a great number of artificial models are built to try to answer the above mentioned task. Based on the different growth ways, these previous models can be divided into two categories, one type, possessing the preferential attachment, follows a power-law P(k) ∼k-γ, 2 motivated from a new attachment way, vertex-edge-growth network-operation, more precisely, the couple of both them. We report that this model is sparse, small world and hierarchical. And then, not only is scale-free feature in our model, but also lies the degree parameter γ(≈ 3 . 242) out the typical range. Note that, we suggest that the coexistence of multiple vertex growth ways will have a prominent effect on the power-law parameter γ, and the preferential attachment plays a dominate role on the development of networks over time. At the end of this paper, we obtain an exact analytical expression for the total number of spanning trees of models and also capture spanning trees entropy which we have compared with those of their corresponding component elements.

  5. Deep sequencing of Salmonella RNA associated with heterologous Hfq proteins in vivo reveals small RNAs as a major target class and identifies RNA processing phenotypes.

    Science.gov (United States)

    Sittka, Alexandra; Sharma, Cynthia M; Rolle, Katarzyna; Vogel, Jörg

    2009-01-01

    The bacterial Sm-like protein, Hfq, is a key factor for the stability and function of small non-coding RNAs (sRNAs) in Escherichia coli. Homologues of this protein have been predicted in many distantly related organisms yet their functional conservation as sRNA-binding proteins has not entirely been clear. To address this, we expressed in Salmonella the Hfq proteins of two eubacteria (Neisseria meningitides, Aquifex aeolicus) and an archaeon (Methanocaldococcus jannaschii), and analyzed the associated RNA by deep sequencing. This in vivo approach identified endogenous Salmonella sRNAs as a major target of the foreign Hfq proteins. New Salmonella sRNA species were also identified, and some of these accumulated specifically in the presence of a foreign Hfq protein. In addition, we observed specific RNA processing defects, e.g., suppression of precursor processing of SraH sRNA by Methanocaldococcus Hfq, or aberrant accumulation of extracytoplasmic target mRNAs of the Salmonella GcvB, MicA or RybB sRNAs. Taken together, our study provides evidence of a conserved inherent sRNA-binding property of Hfq, which may facilitate the lateral transmission of regulatory sRNAs among distantly related species. It also suggests that the expression of heterologous RNA-binding proteins combined with deep sequencing analysis of RNA ligands can be used as a molecular tool to dissect individual steps of RNA metabolism in vivo.

  6. Class size versus class composition

    DEFF Research Database (Denmark)

    Jones, Sam

    Raising schooling quality in low-income countries is a pressing challenge. Substantial research has considered the impact of cutting class sizes on skills acquisition. Considerably less attention has been given to the extent to which peer effects, which refer to class composition, also may affect...... bias from omitted variables, the preferred IV results indicate considerable negative effects due to larger class sizes and larger numbers of overage-for-grade peers. The latter, driven by the highly prevalent practices of grade repetition and academic redshirting, should be considered an important...

  7. Small-group learning in an upper-level university biology class enhances academic performance and student attitudes toward group work.

    Science.gov (United States)

    Gaudet, Andrew D; Ramer, Leanne M; Nakonechny, Joanne; Cragg, Jacquelyn J; Ramer, Matt S

    2010-12-29

    To improve science learning, science educators' teaching tools need to address two major criteria: teaching practice should mirror our current understanding of the learning process; and science teaching should reflect scientific practice. We designed a small-group learning (SGL) model for a fourth year university neurobiology course using these criteria and studied student achievement and attitude in five course sections encompassing the transition from individual work-based to SGL course design. All students completed daily quizzes/assignments involving analysis of scientific data and the development of scientific models. Students in individual work-based (Individualistic) sections usually worked independently on these assignments, whereas SGL students completed assignments in permanent groups of six. SGL students had significantly higher final exam grades than Individualistic students. The transition to the SGL model was marked by a notable increase in 10th percentile exam grade (Individualistic: 47.5%; Initial SGL: 60%; Refined SGL: 65%), suggesting SGL enhanced achievement among the least prepared students. We also studied student achievement on paired quizzes: quizzes were first completed individually and submitted, and then completed as a group and submitted. The group quiz grade was higher than the individual quiz grade of the highest achiever in each group over the term. All students--even term high achievers--could benefit from the SGL environment. Additionally, entrance and exit surveys demonstrated student attitudes toward SGL were more positive at the end of the Refined SGL course. We assert that SGL is uniquely-positioned to promote effective learning in the science classroom.

  8. The different modes of hydro-economic analysis (Invited)

    Science.gov (United States)

    Harou, J. J.; Binions, O.; Erfani, T.

    2013-12-01

    In the face of growing water demands, climate change and spatial and temporal water access variability, accurately assessing the economic impacts of proposed water resource management changes is useful. The objective of this project funded by UK Water Industry Research was to present and demonstrate a framework for identifying and using the ';value of water' to enable water utilities and their regulators to make better decisions. A hydro-economic model can help evaluate water management options in terms of their hydrological and economic impact at different locations throughout a catchment over time. In this talk we discuss three modes in which hydro-economic models can be implemented: evaluative, behavioral and prescriptive. In evaluation mode economic water demand and benefit functions are used to post-process water resource management model results to assess the economic impacts (over space and time) of a policy under consideration. In behavioral hydro-economic models users are represented as agents and the economics is used to help predict their actions. In prescriptive mode optimization is used to find the most economically efficient management actions such as allocation patterns or source selection. These three types of hydro-economic analysis are demonstrated on a UK watershed (Great River Ouse) that includes 97 different water abstractors from amongst the public water supply, agriculture, industry and energy plant cooling sectors. The following issues under dry and normal historical conditions were investigated: Supply/demand investment planning, societal cost of environmental flows, water market prices, and scarcity-sensitive charges for water rights. The talk discusses which hydro-economic modeling mode is used to study each of these issues and why; example results are shown and discussed. The topic of how hydro-economic models can be built and deployed effectively is covered along with how existing water utility operational and planning tools can be

  9. Overview of Hydrometeorologic Forecasting Procedures at BC Hydro

    Science.gov (United States)

    McCollor, D.

    2004-12-01

    Energy utility companies must balance production from limited sources with increasing demand from industrial, business, and residential consumers. The utility planning process requires a balanced, efficient, and effective distribution of energy from source to consumer. Therefore utility planners must consider the impact of weather on energy production and consumption. Hydro-electric companies should be particularly tuned to weather because their source of energy is water, and water supply depends on precipitation. BC Hydro operates as the largest hydro-electric company in western Canada, managing over 30 reservoirs within the province of British Columbia, and generating electricity for 1.6 million people. BC Hydro relies on weather forecasts of watershed precipitation and temperature to drive hydrologic reservoir inflow models and of urban temperatures to meet energy demand requirements. Operations and planning specialists in the company rely on current, value-added weather forecasts for extreme high-inflow events, daily reservoir operations planning, and long-term water resource management. Weather plays a dominant role for BC Hydro financial planners in terms of sensitive economic responses. For example, a two percent change in hydropower generation, due in large part to annual precipitation patterns, results in an annual net change of \\50 million in earnings. A five percent change in temperature produces a \\5 million change in yearly earnings. On a daily basis, significant precipitation events or temperature extremes involve potential profit/loss decisions in the tens of thousands of dollars worth of power generation. These factors are in addition to environmental and societal costs that must be considered equally as part of a triple bottom line reporting structure. BC Hydro water resource managers require improved meteorological information from recent advancements in numerical weather prediction. At BC Hydro, methods of providing meteorological forecast data

  10. Refurbishment of small hydropower plants in Romania; Sanierung von Kleinwasserkraftwerken in Rumaenien

    Energy Technology Data Exchange (ETDEWEB)

    Gmeinbauer, Joerg [Wien Energie GmbH, Wien (Austria)

    2010-07-01

    In 2008 Wien Energie subsidiary Wienstrom GmbH participated in three public auctions of Hidroelectrica S.A. for the sale of old small hydro power plants in Romania. Together with strategic partners Wienstrom could successfully compete against local and international competition and acquired 31 small hydro power plants with a total installed capacity of around 20 MW. The plants were integrated into the newly established Vienna Energy Forta Naturala Srl. and are being completely refurbished at the moment. Wien Energie consequently is already the third largest operator of small hydro power plants in Romania. (orig.)

  11. Hydro in China: Sino-Canadian cooperation

    International Nuclear Information System (INIS)

    Wiebe, P.A.; Webb, N.K.

    1988-01-01

    Despite a population of over 1 billion, China's installed electric generating capacity is similar to Canada's. To help alleviate the energy shortfalls, the government's seventh 5 year plan (1985-1990) calls for annual installation of new capacity of ca 7,000 MW, the equivalent of a James Bay and Churchill Falls complex every two years. In the short term, 2/3 of new capacity will be filled by thermal stations, but in the longer term, China will turn to its huge undeveloped hydroelectric generating capacity. Information is presented on China's hydroelectric resources, and four hydro projects currently under development in conjunction with Canadian International Project Managers (CIPM), a company whose members are Acres International Inc. of Toronto, Lavalin International Inc. of Montreal and S.N.C. Inc. of Montreal. The Zhao Ping project is a conventional 200 MW project on the Gui River in Guangxi Province in south China, comprising a 73 m high concrete gravity dam and spillway. The Gehe Yan comprises a 151 m high concrete gravity arch dam and spillway and a 1,200 MW powerhouse. The Longtan project would be a 215 m high concrete rockfaced dam with ten 500 MW units and an inclined shiplift with a 500 tonne vessel capacity. The Three Gorges is a multi-purpose water control project that will provide flood control to the regions on the middle reaches of the Yangtze, generate over 8,300 MW of power, and improve navigation on the Yangtze River as far as Chongqing. Up to 750,000 people will have to be resettled to higher land within the river valley. 4 figs., 2 tabs

  12. Temperature buffer test. Hydro-mechanical and chemical/ mineralogical characterizations

    Energy Technology Data Exchange (ETDEWEB)

    Aakesson, Mattias; Olsson, Siv; Dueck, Ann; Nilsson, Ulf; Karnland, Ola [Clay Technology AB, Lund (Sweden); Kiviranta, Leena; Kumpulainen, Sirpa [BandTech Oy, Helsinki (Finland); Linden, Johan [Aabo Akademi, Aabo (Finland)

    2012-01-15

    The Temperature Buffer Test (TBT) is a joint project between SKB/ANDRA and supported by ENRESA (modeling) and DBE (instrumentation), which aims at improving the understanding and to model the thermo-hydro-mechanical behavior of buffers made of swelling clay submitted to high temperatures (over 100 deg C) during the water saturation process. The test has been carried out in a KBS-3 deposition hole at Aspo HRL. It was installed during the spring of 2003. Two steel heaters (3 m long, 0.6 m diameter) and two buffer arrangements have been investigated: the lower heater was surrounded by rings of compacted Wyoming bentonite only, whereas the upper heater was surrounded by a composite barrier, with a sand shield between the heater and the bentonite. The test was dismantled and sampled during the winter of 2009/2010. This report presents the hydro-mechanical and chemical/mineralogical characterization program which was launched subsequent to the dismantling operation. The main goal has been to investigate if any significant differences could be observed between material from the field experiment and the reference material. The field samples were mainly taken from Ring 4 (located at the mid-section around the lower heater), in which the temperature in the innermost part reached 155 deg C. The following hydro-mechanical properties have been determined for the material (test technique within brackets): hydraulic conductivity (swelling pressure device), swelling pressure (swelling pressure device), unconfined compression strength (mechanical press), shear strength (triaxial cell) and retention properties (jar method). The following chemical/mineralogical properties (methods within brackets) were determined: anion analysis of water leachates (IC), chemical composition (ICP/AES+MS, EGA), cation exchange capacity (CEC, Cu-trien method) and exchangeable cations (exchange with NH4, ICPAES), mineralogical composition (XRD and FTIR), element distribution and microstructure (SEM and

  13. The HydroShare Collaborative Repository for the Hydrology Community

    Science.gov (United States)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Couch, A.; Hooper, R. P.; Dash, P. K.; Stealey, M.; Yi, H.; Bandaragoda, C.; Castronova, A. M.

    2017-12-01

    HydroShare is an online, collaboration system for sharing of hydrologic data, analytical tools, and models. It supports the sharing of, and collaboration around, "resources" which are defined by standardized content types for data formats and models commonly used in hydrology. With HydroShare you can: Share your data and models with colleagues; Manage who has access to the content that you share; Share, access, visualize and manipulate a broad set of hydrologic data types and models; Use the web services application programming interface (API) to program automated and client access; Publish data and models and obtain a citable digital object identifier (DOI); Aggregate your resources into collections; Discover and access data and models published by others; Use web apps to visualize, analyze and run models on data in HydroShare. This presentation will describe the functionality and architecture of HydroShare highlighting our approach to making this system easy to use and serving the needs of the hydrology community represented by the Consortium of Universities for the Advancement of Hydrologic Sciences, Inc. (CUAHSI). Metadata for uploaded files is harvested automatically or captured using easy to use web user interfaces. Users are encouraged to add or create resources in HydroShare early in the data life cycle. To encourage this we allow users to share and collaborate on HydroShare resources privately among individual users or groups, entering metadata while doing the work. HydroShare also provides enhanced functionality for users through web apps that provide tools and computational capability for actions on resources. HydroShare's architecture broadly is comprised of: (1) resource storage, (2) resource exploration website, and (3) web apps for actions on resources. System components are loosely coupled and interact through APIs, which enhances robustness, as components can be upgraded and advanced relatively independently. The full power of this paradigm is the

  14. Social Classes

    DEFF Research Database (Denmark)

    Aktor, Mikael

    2018-01-01

    . Although this social structure was ideal in nature and not equally confirmed in other genres of ancient and medieval literature, it has nevertheless had an immense impact on Indian society. The chapter presents an overview of the system with its three privileged classes, the Brahmins, the Kṣatriyas......The notions of class (varṇa) and caste (jāti) run through the dharmaśāstra literature (i.e. Hindu Law Books) on all levels. They regulate marriage, economic transactions, work, punishment, penance, entitlement to rituals, identity markers like the sacred thread, and social interaction in general...

  15. Impact of flocculation on flotation tailing's hydro-cycloning properties

    Directory of Open Access Journals (Sweden)

    Knežević Dinko N.

    2014-01-01

    Full Text Available Research results of hydro-cycloning of flocculated and non-flocculated flotation tailing from the lead and zinc open pit mine 'Suplja stijena', Sula - Montenegro have been shown in this paper. Reason for this research was finding conditions in order to separate fraction that is suitable for embankment erection. Flotation tailings has been tested in the very state that it goes out from the flotation process and tailings which is flocculated by anionic flocculant. The object was to determine the impact of flocculation on properties of hydro-cycloning products and disposal process. In hydro-cycloning process greater underflow mass is being separated with non-flocculated tailing. Values of geomechanical parameters are significantly different, especially hydro-cyclone's underflow. All geomechanical parameters of hydro-cyclone's underflow are suitable for erecting embankment which shall be made from non-flocculated tailing. Underflow drainage of non-flocculated tailing is faster while overflow drainage is slower and problematic with both tailings.

  16. Canadian hydro potential in the North American market

    International Nuclear Information System (INIS)

    Adams, K.

    2002-01-01

    Canada's hydro potential in the North American energy market was discussed. Canada is a net exporter of electricity in North America, and since 1990, has exported an average of 28 Terawatt hours/year to the United States. More than 65 per cent of these exports were generated from hydro power plants. It was emphasized that significant reductions in greenhouse gases can be achieved if Canadian hydroelectricity is substituted for coal power generation. It was also noted that although there may not be enough hydro capacity to meet all of North America's energy requirements, development of new large hydro resources in Canada could help meet the growing demand for electricity in the United States. Hydro can also complement other renewable energy sources such as wind and solar. The factors that will determine if Canadian hydropower will contribute to the energy demand are market mechanisms such as greenhouse gas credit trading systems which provide incentive for renewable energy projects. In addition, the existing infrastructure must be expanded both east and west within Canada and north and south between Canada and the United States. 5 figs

  17. Design, construction and operation of Ontario Hydro's CANDU plants

    International Nuclear Information System (INIS)

    Campbell, P.G.

    1981-06-01

    Ontario Hydro has been producing electricity commercially from nuclear power since 1968, using CANDU reactors which have proved enormously successful. The 206-MW Douglas Point station, nearly 10 times larger than the first Canadian power reactor, NPD-2, resulted from a cooperative effort between Atomic Energy of Canada Ltd., the provincial government of Ontario, and Ontario Hydro. This approach led to a basic working relationship between the parties, with Ontario Hydro acting as project manager and builder, and AECL acting as consultant with respect to the nuclear components. Before Douglas Point was fully commissioned Ontario Hydro was ready to commit itself to more nuclear stations, and work was started on the four-unit Pickering nuclear generating station. Multi-unit stations were adopted to achieve economies of scale, and the concept has been retained for all subsequent nuclear power plants constructed in the province. The organization of Ontario Hydro's project management, construction, and operation of nuclear generating stations is described. Performance of the existing stations and cost of the power they produce have been entirely acceptable

  18. Dynamic hydro-climatic networks in pristine and regulated rivers

    Science.gov (United States)

    Botter, G.; Basso, S.; Lazzaro, G.; Doulatyari, B.; Biswal, B.; Schirmer, M.; Rinaldo, A.

    2014-12-01

    Flow patterns observed at-a-station are the dynamical byproduct of a cascade of processes involving different compartments of the hydro-climatic network (e.g., climate, rainfall, soil, vegetation) that regulates the transformation of rainfall into streamflows. In complex branching rivers, flow regimes result from the heterogeneous arrangement around the stream network of multiple hydrologic cascades that simultaneously occur within distinct contributing areas. As such, flow regimes are seen as the integrated output of a complex "network of networks", which can be properly characterized by its degree of temporal variability and spatial heterogeneity. Hydrologic networks that generate river flow regimes are dynamic in nature. In pristine rivers, the time-variance naturally emerges at multiple timescales from climate variability (namely, seasonality and inter-annual fluctuations), implying that the magnitude (and the features) of the water flow between two nodes may be highly variable across different seasons and years. Conversely, the spatial distribution of river flow regimes within pristine rivers involves scale-dependent transport features, as well as regional climatic and soil use gradients, which in small and meso-scale catchments (A guarantee quite uniform flow regimes and high spatial correlations. Human-impacted rivers, instead, constitute hybrid networks where observed spatio-temporal patterns are dominated by anthropogenic shifts, such as landscape alterations and river regulation. In regulated rivers, the magnitude and the features of water flows from node to node may change significantly through time due to damming and withdrawals. However, regulation may impact river regimes in a spatially heterogeneous manner (e.g. in localized river reaches), with a significant decrease of spatial correlations and network connectivity. Provided that the spatial and temporal dynamics of flow regimes in complex rivers may strongly impact important biotic processes

  19. Birthing Classes

    Science.gov (United States)

    ... management options. Breastfeeding basics. Caring for baby at home. Birthing classes are not just for new parents, though. ... midwife. Postpartum care. Caring for your baby at home, including baby first aid. Lamaze One of the most popular birthing techniques in the U.S., Lamaze has been around ...

  20. BC Hydro's business plan: a summary of BC Hydro's strategic business plan and performance measures

    International Nuclear Information System (INIS)

    2000-04-01

    This document contains a summary of BC Hydro's Strategic Plan and performance measures. The plan has been prepared in response to the recommendations of the Budget Process Review Panel, convened by the BC Government, which recommended that each public body, crown corporation, and other agencies of government, prepare an annual three year business plan. The document reviews the utility's current situation, provides an outline of the company's vision of its role, its mission and values, its strategic objectives (effective governance, efficiency and productivity; service excellence and value-added solutions; market development ; strong and capable organization) and the tools to be utilized in measuring performance. Various strategic issues (financial resources, the need to protect and enhance the value of electricity trading; the impact of information technology; power technology development; environmental trends and 'green energy' initiatives; workforce training and development) are also highlighted

  1. Hydro-Quebec line crew returns home from Haiti

    Energy Technology Data Exchange (ETDEWEB)

    Horne, D.

    2005-04-01

    This article recounted the experience of a 14-member Hydro-Quebec line crew and support group that travelled to Haiti in November 2004 to help re-establish essential electricity services. The work was conducted together with Electricite d'Haiti (EDH). The team installed 400 poles, 10 km of conductors and 85 transformers, restoring service to water pumps; La Providence and Raboteau hospitals; a centre housing Doctors without borders; a CARE distribution centre; and several convents and schools. The installation of street lights at strategic points allowed lighting to be restored in several districts of Gonaives. Hydro-Quebec was able to extend their mission to Haiti and purchase more poles and transformers with the help of a $500,000 contribution from the Canadian International Development Agency. Hydro-Quebec was the only company who came to the aid of EDH. The total budget for the project was $4 million. 2 figs.

  2. Hydro-Quebec opens up, expects positive reaction from FERC

    International Nuclear Information System (INIS)

    McArthur, D.; Salaff, S.

    1997-01-01

    Hydro-Quebec Energy Services US (HQUS), the marketing arm of Hydro-Quebec, amended its application for a power marketing licence with the Federal Energy Regulatory Commission (FERC), by offering to open up five per cent of the wholesale Quebec electricity market to competition. The Corporation hopes that its revised application will satisfy FERC to grant HQUS a power marketer licence, with the right to sell electricity in the US at market-based rates. Hydro-Quebec insiders believe that in addition to opening up the market to competition, thereby equalizing market conditions on both sides of the border, the Corporation's chances of receiving the licence also have been improved by the creation of the provincial energy board (Regie de l'energie) which in future will regulate electricity and gas transmission through Quebec, and establish transmission tariffs. FERC ruling is expected within 60 days of the March 7, 1997 amended application

  3. Environmental impact and benefit from hydro-energy: Bulgarian case

    International Nuclear Information System (INIS)

    Vesselinov, V.; Iotova, A.

    1996-01-01

    The present hydro energy system in Bulgaria has been constructed mainly in the period 1950-1965. The currently utilized hydro-power potential, only 33% of the estimated technical potential, includes 87 HPP operating in 1991. A complex assessment of the environmental impact of the hydro energy objects as well as a comparative analysis of all energy sources in Bulgaria is made in the framework of Bulgarian Case Study of the DECADES Inter-Agency Project. The main types of environmental impact related to HPP operation are presented in 7 specific categories: land requirements, changes in the landscape, hydrological changes, micro-climatic changes, geodynamic changes, risk from man-made activities; generation of new ecosystems. A technique of expertise in ball is proposed as a suitable quantitative approach for more precise assessment of impact on climate factors from different energy sources. 2 tabs., 5 refs

  4. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  5. Ontario Hydro at the millennium : has monopoly's moment passed?

    International Nuclear Information System (INIS)

    Daniels, R.J.

    1996-01-01

    This volume is a collection of 10 papers presented at a conference in which the challenges of restructuring the electric power industry in Ontario were discussed. Legal experts, policy makers, economists and stakeholders in the industry presented their views regarding the future of the industry in Ontario. The implications of privatization were discussed. There was general agreement on the need for some industry de-integration and privatization. However, agreement on the exact nature of the approach to take was more divided. For example, opinion was divided on what the logical endpoint of industry restructuring should be i.e. wholesale or retail competition. Also contentious was the question of what portion of Hydro's generating assets should be sold off to private enterprise if Hydro's generation and transmission assets are unbundled. Opinions were also divided about the environmental consequences of nuclear energy. Significant differences of opinion were evident concerning the privatization of Ontario Hydro's nuclear assets. refs., tabs., figs

  6. PCB management at Manitoba Hydro's Waverley Service Centre

    International Nuclear Information System (INIS)

    Rempel, R.G.; Engstrom, T.

    1996-01-01

    Manitoba Hydro was the first Canadian utility to initiate a program to decontaminate insulating oil contaminated with polychlorinated biphenyls (PCBs). This paper describes Manitoba Hydro's recovery, reuse and recycling program, operated out of the utility's Waverley Service Centre (WSC). The WSC is a central facility serving to phase out and and destroy PCBs which remain in Manitoba Hydro's electrical system. Several hundred thousand litres of PCB-contaminated insulating oil are decontaminated annually at the WSC. The decontaminated oil is then reconditioned for reuse within the system operations. A PCBX unit was purchased from Sun Ohio for the decontamination of insulating oils containing PCBs. PCB decontamination is achieved through a chemical dechlorination treatment process. The PCBX treatment unit and the PCB storage building were described. 18 refs., 8 figs

  7. Ontario Hydro's transportation of radioactive material and emergency response plan

    International Nuclear Information System (INIS)

    Karmali, N.

    1993-01-01

    Ontario Hydro has been transporting radioactive material for almost 30 years without any exposure to the public or release to the environment. However, there have been three accidents involving Hydro's shipments of radioactive material. In addition to the quality packaging and shipping program, Ontario Hydro has an Emergency Response Plan and capability to deal with an accident involving a shipment of radioactive material. The Corporation's ability to respond, to effectively control and contain the situation, site remediation, and to provide emergency public information in the event of a road accident minimizes the risk to the public and the environment. This emphasizes their commitment to worker safety, public safety and impact to the environment. Response capability is mandated under various legislation and regulations in Canada

  8. Hydro biological investigations of lake Drukshiai

    International Nuclear Information System (INIS)

    Mazheikaite, S.; Sinkevichiene, Z.; Marchiulioniene, D.; Astrauskas, A.; Barshiene, J.

    1998-01-01

    Purposes of this research were to investigate changes in the physical, chemical and tropic conditions of Lake Drukshiai caused by the combined effect of Ignalina NPP and how it effects on structures and function of biocenoses; to estimate the influence of phytocenoses, zoocenoses and bacteriocenoses on the quality of water in Lake Drukshiai; to estimate the eco toxicological state of Lake Drukshiai. According to the complex hydro biological investigations on Lake Drukshiai - Ignalina NPP cooler great changes in planktonic organism community, tendencies of those changes in different ecological zones were evaluated in 1993 - 1997. The amount of species of most dominant planktonic organisms in 1993 - 1997 decreased 2-3 times in comparison with that before Ignalina NPP operation: phytoplankton from 116 to 40 - 50, zooplankton - from 233 to 139. The organic matter increasing tendency was determined in bottom sediments of the lake. The highest amount of it was evaluated in the south - eastern part of the lake. 69 water macrophyte species were found in bottom sediments during the investigation period. 16 species were not found in this lake earlier. Abundance of filamentous green algae was registered.The rates of fish communities successional transformation were ten times in excess of those of the given processes in natural lakes. Moreover the comparison of results on Lake Drukshiai bioindication analysis with changes of comparable bio markers which were obtained from other water systems of Lithuania, Switzerland, Sweden and Poland, including those with active nuclear power plants in their environment was carried out. It was determined that the functional and structural changes in Lake Drukshiai biota are mostly caused by chemical pollution. It was found out that the frequency of cytogenetic damage emerged as a specific radionuclide - caused effect in aquatic organisms inhabiting Lake Drukshiai, is slightly above the background level and is 5 times lower than the same

  9. Coupling X-band dual-polarized mini-radars and hydro-meteorological forecast models: the HYDRORAD project

    Directory of Open Access Journals (Sweden)

    E. Picciotti

    2013-05-01

    Full Text Available Hydro-meteorological hazards like convective outbreaks leading to torrential rain and floods are among the most critical environmental issues world-wide. In that context weather radar observations have proven to be very useful in providing information on the spatial distribution of rainfall that can support early warning of floods. However, quantitative precipitation estimation by radar is subjected to many limitations and uncertainties. The use of dual-polarization at high frequency (i.e. X-band has proven particularly useful for mitigating some of the limitation of operational systems, by exploiting the benefit of easiness to transport and deploy and the high spatial and temporal resolution achievable at small antenna sizes. New developments on X-band dual-polarization technology in recent years have received the interest of scientific and operational communities in these systems. New enterprises are focusing on the advancement of cost-efficient mini-radar network technology, based on high-frequency (mainly X-band and low-power weather radar systems for weather monitoring and hydro-meteorological forecasting. Within the above context, the main objective of the HYDRORAD project was the development of an innovative mbox{integrated} decision support tool for weather monitoring and hydro-meteorological applications. The integrated system tool is based on a polarimetric X-band mini-radar network which is the core of the decision support tool, a novel radar products generator and a hydro-meteorological forecast modelling system that ingests mini-radar rainfall products to forecast precipitation and floods. The radar products generator includes algorithms for attenuation correction, hydrometeor classification, a vertical profile reflectivity correction, a new polarimetric rainfall estimators developed for mini-radar observations, and short-term nowcasting of convective cells. The hydro-meteorological modelling system includes the Mesoscale Model 5

  10. HydroSHEDS: A global comprehensive hydrographic dataset

    Science.gov (United States)

    Wickel, B. A.; Lehner, B.; Sindorf, N.

    2007-12-01

    The Hydrological data and maps based on SHuttle Elevation Derivatives at multiple Scales (HydroSHEDS) is an innovative product that, for the first time, provides hydrographic information in a consistent and comprehensive format for regional and global-scale applications. HydroSHEDS offers a suite of geo-referenced data sets, including stream networks, watershed boundaries, drainage directions, and ancillary data layers such as flow accumulations, distances, and river topology information. The goal of developing HydroSHEDS was to generate key data layers to support regional and global watershed analyses, hydrological modeling, and freshwater conservation planning at a quality, resolution and extent that had previously been unachievable. Available resolutions range from 3 arc-second (approx. 90 meters at the equator) to 5 minute (approx. 10 km at the equator) with seamless near-global extent. HydroSHEDS is derived from elevation data of the Shuttle Radar Topography Mission (SRTM) at 3 arc-second resolution. The original SRTM data have been hydrologically conditioned using a sequence of automated procedures. Existing methods of data improvement and newly developed algorithms have been applied, including void filling, filtering, stream burning, and upscaling techniques. Manual corrections were made where necessary. Preliminary quality assessments indicate that the accuracy of HydroSHEDS significantly exceeds that of existing global watershed and river maps. HydroSHEDS was developed by the Conservation Science Program of the World Wildlife Fund (WWF) in partnership with the U.S. Geological Survey (USGS), the International Centre for Tropical Agriculture (CIAT), The Nature Conservancy (TNC), and the Center for Environmental Systems Research (CESR) of the University of Kassel, Germany.

  11. Water turbine technology for small power stations

    Science.gov (United States)

    Salovaara, T.

    1980-02-01

    The paper examines hydro-power stations and the efficiency and costs of using water turbines to run them. Attention is given to different turbine types emphasizing the use of Kaplan-turbines and runners. Hydraulic characteristics and mechanical properties of low head turbines and small turbines, constructed of fully fabricated steel plate structures, are presented.

  12. 75 FR 18191 - City of Raleigh; Community Hydro, LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2010-04-09

    ...: Mr. Thomas A. McCormick, Raleigh City Attorney, P.O. Box 590, Raleigh, North Carolina 27601, e-mail tom.mccormick@ci.raleigh.nc.us . For Community Hydro, LLC: Lori Barg, Community Hydro, LLC, 113...

  13. 76 FR 8728 - Bear Creek Hydro Associates, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-02-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13951-000] Bear Creek Hydro..., Motions To Intervene, and Competing Applications On December 22, 2010, the Bear Creek Hydro Associates... (FPA), proposing to study the [[Page 8729

  14. The HydroServer Platform for Sharing Hydrologic Data

    Science.gov (United States)

    Tarboton, D. G.; Horsburgh, J. S.; Schreuders, K.; Maidment, D. R.; Zaslavsky, I.; Valentine, D. W.

    2010-12-01

    The CUAHSI Hydrologic Information System (HIS) is an internet based system that supports sharing of hydrologic data. HIS consists of databases connected using the Internet through Web services, as well as software for data discovery, access, and publication. The HIS system architecture is comprised of servers for publishing and sharing data, a centralized catalog to support cross server data discovery and a desktop client to access and analyze data. This paper focuses on HydroServer, the component developed for sharing and publishing space-time hydrologic datasets. A HydroServer is a computer server that contains a collection of databases, web services, tools, and software applications that allow data producers to store, publish, and manage the data from an experimental watershed or project site. HydroServer is designed to permit publication of data as part of a distributed national/international system, while still locally managing access to the data. We describe the HydroServer architecture and software stack, including tools for managing and publishing time series data for fixed point monitoring sites as well as spatially distributed, GIS datasets that describe a particular study area, watershed, or region. HydroServer adopts a standards based approach to data publication, relying on accepted and emerging standards for data storage and transfer. CUAHSI developed HydroServer code is free with community code development managed through the codeplex open source code repository and development system. There is some reliance on widely used commercial software for general purpose and standard data publication capability. The sharing of data in a common format is one way to stimulate interdisciplinary research and collaboration. It is anticipated that the growing, distributed network of HydroServers will facilitate cross-site comparisons and large scale studies that synthesize information from diverse settings, making the network as a whole greater than the sum of its

  15. Hydro models and salmon recovery in the northwest

    International Nuclear Information System (INIS)

    Dragoon, K.

    1993-01-01

    Hydro regulation models provide extensive support for analyzing the efficacy of salmon recovery plans in the Northwest. Power planners developed these computer programs to help plan and efficiently operate a large multiple use river system. The models represent physical relationships and operational requirements on the system. They also simulate coordinated system operations for efficient power generation. These models are being pressed into service to provide data for fish recovery plans. They provide important information about hydro system capabilities and responses to recovery programs. However, the models cannot meet all of the analytical needs of fish biologists working toward salmon recovery

  16. A Full Hydro- and Morphodynamic Description of Breaker Bar Development

    DEFF Research Database (Denmark)

    Jacobsen, Niels Gjøl

    The present thesis considers a coupled modelling approach for hydro- and morphodynamics in the surf zone, which is based on a solution to the Reynolds Averaged Navier-Stokes (RANS) equations with a Volume of Fluid (VOF) closure for the surf tracking. The basis for the numerical approach is the su......The present thesis considers a coupled modelling approach for hydro- and morphodynamics in the surf zone, which is based on a solution to the Reynolds Averaged Navier-Stokes (RANS) equations with a Volume of Fluid (VOF) closure for the surf tracking. The basis for the numerical approach...

  17. Report on the renewal of the hydro-electric concessions

    International Nuclear Information System (INIS)

    2006-11-01

    The administrative procedures of the renewable of the hydro-electric concessions in France is a real problem, leading to too long time of the case files examination. This mission aimed to identify the technical and financial criteria on which the decision maker will base his choice to give the concessions renewal. This report exposes the evaluation and the recommendations of the mission. The first part establishes an evaluation of the situation of the hydro-electric concessions and the today renewal procedures. The second part presents a analysis of this situation and the recommendations. The last part brings the conclusions. (A.L.B.)

  18. Towards A Grid Infrastructure For Hydro-Meteorological Research

    Directory of Open Access Journals (Sweden)

    Michael Schiffers

    2011-01-01

    Full Text Available The Distributed Research Infrastructure for Hydro-Meteorological Study (DRIHMS is a coordinatedaction co-funded by the European Commission. DRIHMS analyzes the main issuesthat arise when designing and setting up a pan-European Grid-based e-Infrastructure for researchactivities in the hydrologic and meteorological fields. The main outcome of the projectis represented first by a set of Grid usage patterns to support innovative hydro-meteorologicalresearch activities, and second by the implications that such patterns define for a dedicatedGrid infrastructure and the respective Grid architecture.

  19. Decision making algorithms for hydro-power plant location

    CERN Document Server

    Majumder, Mrinmoy

    2013-01-01

    The present study has attempted to apply the advantage of neuro-genetic algorithms for optimal decision making in maximum utilization of natural resources. Hydro-power is one of the inexpensive, but a reliable source of alternative energy which is foreseen as the possible answer to the present crisis in the energy sector. However, the major problem related to hydro-energy is its dependency on location. An ideal location can produce maximum energy with minimum loss. Besides, such power-plant also requires substantial amount of land which is a precious resource nowadays due to the rapid and unco

  20. Neuro-fuzzy modelling of hydro unit efficiency

    International Nuclear Information System (INIS)

    Iliev, Atanas; Fushtikj, Vangel

    2003-01-01

    This paper presents neuro-fuzzy method for modeling of the hydro unit efficiency. The proposed method uses the characteristics of the fuzzy systems as universal function approximates, as well the abilities of the neural networks to adopt the parameters of the membership's functions and rules in the consequent part of the developed fuzzy system. Developed method is practically applied for modeling of the efficiency of unit which will be installed in the hydro power plant Kozjak. Comparison of the performance of the derived neuro-fuzzy method with several classical polynomials models is also performed. (Author)

  1. From centralized hydro-thermal to decentralized renewable : the Austrian challenge

    International Nuclear Information System (INIS)

    Brauner, G.

    2007-01-01

    Austria's electricity production scheme is currently based on 67 per cent hydro power, 25 per cent fossil thermal power and 8 per cent new renewable energy, including wind, biomass, and photovoltaic conversion. As demand on centralized energy systems increases, the power generation, transmission and distribution system in the country will have to be restructured to increase the portion of regenerative generation. Decentralized micro-grid structures are a promising concept for meeting the target of efficiency improvement and renewable generation because they make it possible to use regenerative energy where it is collected. The most efficient way to meet the challenges of efficiency improvement and emission reduction is the replacement of old coal-fired power stations by new combined-cycle gas power stations with combined heat and power. This will reduce both carbon dioxide emissions as well as specific fossil energy demand. However, in just 1 decade the emission reduction achieved by fuel switching and higher efficiency of power stations will be equalized by higher demand, which is growing at an annual rate of 2 per cent. Future energy problems will be characterized by the security of supply; climatic change and the need for clean energy technologies; the lack of transmission-routes; and growing energy demand. The regenerative energy in Austria currently consists of hydraulic large run-of-river hydraulic generation as well as small scale hydro and large scale hydro storage systems. Biomass currently has a total generating capacity of 280 MW and forms 3.14 per cent of generation in Austria. Wind has reached a capacity of 950 MW and forms 3.8 per cent of generation in Austria. It was concluded that the future philosophy in energy supply will not be to try to increase regenerative generation according to growing demand, but to improve end-use efficiency and reduce demand according to the renewable regional potential. 4 refs., 4 figs

  2. An artificial intelligence (AI) NOx/heat rate optimization system for Ontario Hydro`s fossil generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Luk, J.; Frank, A.; Bodach, P. [Ontario Hydro, Toronto, ON (Canada); Warriner, G. [Radian International, Tucker, GA (United States); Noblett, J. [Radian International, Austin, TX (United States); Slatsky, M. [Southern Company, Birmingham, AL (United States)

    1999-08-01

    Artificial intelligence (AI)-based software packages which can optimize power plant operations that improves heat rate and also reduces nitrogen oxide emissions are now commonly available for commercial use. This paper discusses the implementation of the AI-based NOx and Heat Rate Optimization System at Ontario Hydro`s generation stations, emphasizing the current AI Optimization Project at Units 5 and 6 of the Lakeview Generating Station. These demonstration programs are showing promising results in NOx reduction and plant performance improvement. The availability of the plant Digital Control System (DCS) in implementing AI optimization in a closed-loop system was shown to be an important criterion for success. Implementation of AI technology at other Ontario Hydro fossil generating units as part of the overall NOx emission reduction system is envisaged to coincide with the retrofit of the original plant control system with the latest DCS systems. 14 refs., 3 figs.

  3. Mechatronics in compressor valves - experience with HydroCOM; Mechatronik in Kompressorventilen - Betriebserfahrungen mit HydroCOM

    Energy Technology Data Exchange (ETDEWEB)

    Rumpold, A. [Hoerbiger Ventilwerke GmbH, Wien (Austria)

    2000-03-01

    Optimisation of fluid flow rates is indispensable in piston compressor operation. Messrs. Hoerbiger are producers of continuous control elements which combine mechanical and electronic components. Applications and examples of the HydroCOM control system are presented. High availability permits servicing intervals around 160,000 hours of operation. The longer operating time will improve the competitive standing of piston compressors as compared to turbocompressors and screw compressors. [German] Fuer den Betrieb von Kolbenkompressoren ist eine optimale Liefermengenregelung unverzichtbarer Bestandteil. Im Gegensatz zu herkoemmlichen Verfahren hat Hoerbiger vor zwei Jahren durch die Kombination von Mechanik und Elektronik eine neue Generation von stufenlosen Mengenregelungen auf den Markt gebracht. Anwendungsbeispiele und Betriebserfahrungen mit der HydroCOM Regelung werden vorgestellt. Hohe Verfuegbarkeit erlaubt Wartungsintervalle fuer HydroCOM Aktuatoren von ca. 16000 Betriebsstunden. Und aufgrund der generell verbesserten Standzeiten von Packungen, Kolbenringen und Ventilen erzielt der so geregelte Kolbenkompressor hohe Attraktivitaet gegenueber Turbo- und Schraubenverdichtern. (orig./AKF)

  4. HydroPak: concept design and analysis of a packaged cross-flow turbine

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This report summarises the findings of a project to complete the conceptual design and economic optimization of a modular standardised crossflow hydro-turbine. Details are given of the work to date, the comparison of HydroPak cost with conventional micro- and mini-hydro power costs, and the economic advantages of taking the ''packaged'' and ''standardised approaches'' to the design process. The market for mini-hydro turbines is discussed.

  5. HydroPak: concept design and analysis of a packaged cross-flow turbine

    International Nuclear Information System (INIS)

    2004-01-01

    This report summarises the findings of a project to complete the conceptual design and economic optimization of a modular standardised crossflow hydro-turbine. Details are given of the work to date, the comparison of HydroPak cost with conventional micro- and mini-hydro power costs, and the economic advantages of taking the ''packaged'' and ''standardised approaches'' to the design process. The market for mini-hydro turbines is discussed

  6. Inventory studies of hydroelectric power plants: the methodological differences for small and large power plants; Estudos de inventario de usinas hidreletricas: as diferencas metodologicas para pequenas e grandes centrais

    Energy Technology Data Exchange (ETDEWEB)

    Bajay, Sergio Valdir [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica. Dept. de Energia; Martinez, Carlos Barreira [Faculdade de Engenharia Civil de Itajuba, MG (Brazil)

    1992-12-31

    The hydroelectric potential handbook produced by ELETROBRAS provides procedures to guides the hydro power studies of river sites. In this paper, a critical analysis of these procedures is carried out, for both large and small hydro power plants, pin pointing the plant`s planning/design interface there, several proposals are put forward in the order to adapt these procedures to small hydro plants, optimizing their planning and design for the several situation, found in Brazilian reality. (author) 5 refs.

  7. Coding Class

    DEFF Research Database (Denmark)

    Ejsing-Duun, Stine; Hansbøl, Mikala

    Denne rapport rummer evaluering og dokumentation af Coding Class projektet1. Coding Class projektet blev igangsat i skoleåret 2016/2017 af IT-Branchen i samarbejde med en række medlemsvirksomheder, Københavns kommune, Vejle Kommune, Styrelsen for IT- og Læring (STIL) og den frivillige forening...... Coding Pirates2. Rapporten er forfattet af Docent i digitale læringsressourcer og forskningskoordinator for forsknings- og udviklingsmiljøet Digitalisering i Skolen (DiS), Mikala Hansbøl, fra Institut for Skole og Læring ved Professionshøjskolen Metropol; og Lektor i læringsteknologi, interaktionsdesign......, design tænkning og design-pædagogik, Stine Ejsing-Duun fra Forskningslab: It og Læringsdesign (ILD-LAB) ved Institut for kommunikation og psykologi, Aalborg Universitet i København. Vi har fulgt og gennemført evaluering og dokumentation af Coding Class projektet i perioden november 2016 til maj 2017...

  8. 75 FR 65312 - Vortex Hydro Energy, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2010-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13831-000] Vortex Hydro... Comments and Interventions October 15, 2010. On August 9, 2010, Vortex Hydro Energy, LLC filed an... 0.788 gigawatt-hours. Applicant Contact: Gus Simiao, CEO, Vortex Hydro Energy, LLC, 2512 Carpenter...

  9. 76 FR 76155 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-12-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P-14227-000] Nevada Hydro..., Motions To Intervene, and Competing Applications On July 14, 2011, the Nevada Hydro Company (Nevada Hydro... Diego Gas & Electric Company transmission line located to the south. Applicant Contact: Arnold B...

  10. 77 FR 21765 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-04-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P-14227-000] Nevada Hydro..., Motions To Intervene, and Competing Applications On July 14, 2011, the Nevada Hydro Company (Nevada Hydro... California Edison located north of the proposed project and to an existing San Diego Gas & Electric Company...

  11. Laboratory developments of a diagonal turbine for medium head small hydro power plants (25 - 100 m). Final report; Turbines diagonales. Programme de developpement d'une turbine hydraulique diagonale destinee a equiper les petites centrales a moyenne chute (25 a 100 m) - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Choulot, A.; Denis, V.

    2009-11-15

    The first result of the project was the mechanical design of the diagonal turbine and, in particular, the runner and the adjustable blade driving system. The system was designed for the 12-blade runner and is thus suitable for any lower number of blades. With a reference runner diameter of 329.4 mm, the laboratory test model corresponds approximately to the smallest size for a prototype of Diagonal turbine. The mechanical design is thus available for any larger prototype. The complementary use of numerical simulations and laboratory tests provided a deep understanding of the hydraulic behaviour of the Diagonal turbine. Based on this extensive knowledge, the mechanical set-up and hydraulic design was significantly improved. The developments showed that the effect of the gap between the discharge ring and the blades on both the efficiency and cavitation behaviour was significantly enhanced compared to Kaplan turbines. The optimization of this gap together with improvements of the geometry enabled to raise the maximum efficiency from 86.5% with the initial configuration to more than 92%, and to significantly reduce the development of cavitation. The first developed configuration was the 8-blade runner. Various guide vane configurations were tested. The analysis of numerical and experimental results led to the development of an optimal configuration with a maximum efficiency of 92% and a satisfactory cavitation behaviour suitable for heads up to 50 m. The development of the 12-blade runner fully profited from the knowledge gained with the 8 blade configuration. The improved blade design process significantly fastened the development phase necessary to obtain high performances. The maximum efficiency is above 92% and the cavitation behaviour allows 80 m heads. Based on these good results, a first demonstration project was launched to equip the Montsalvens site (Switzerland). The objective is to install a turbine at the foot of the Montsalvens dam of the existing hydro

  12. Integrated Hydro-geomorphological Monitoring System of the Upper Bussento river basin (Cilento and Vallo Diano Geopark, S-Italy)

    Science.gov (United States)

    Guida, D.; Cuomo, A.; Longobardi, A.; Villani, P.; Guida, M.; Guadagnuolo, D.; Cestari, A.; Siervo, V.; Benevento, G.; Sorvino, S.; Doto, R.; Verrone, M.; De Vita, A.; Aloia, A.; Positano, P.

    2012-04-01

    The Mediterranean river ecosystem functionings are supported by river-aquifer interactions. The assessment of their ecological services requires interdisciplinary scientific approaches, integrate monitoring systems and inter-institutional planning and management. This poster illustrates the Hydro-geomorphological Monitoring System build-up in the Upper Bussento river basin by the University of Salerno, in agreement with the local Basin Autorities and in extension to the other river basins located in the Cilento and Vallo Diano National Park (southern Italy), recently accepted in the European Geopark Network. The Monitoring System is based on a hierarchical Hydro-geomorphological Model (HGM), improved in a multiscale, nested and object-oriented Hydro-geomorphological Informative System (HGIS, Figure 1). Hydro-objects are topologically linked and functionally bounded by Hydro-elements at various levels of homogeneity (Table 1). Spatial Hydro-geomorpho-system, HG-complex and HG-unit support respectively areal Hydro-objects, as basin, sector and catchment and linear Hydro-objects, as river, segment, reach and section. Runoff initiation points, springs, disappearing points, junctions, gaining and water losing points complete the Hydro-systems. An automatic procedure use the Pfafstetter coding to hierarchically divide a terrain into arbitrarily small hydro-geomorphological units (basin, interfluve, headwater and no-contribution areas, each with a unique label with hierarchical topological properties. To obtain a hierarchy of hydro-geomorphological units, the method is then applied recursively on each basin and interbasin, and labels of the subdivided regions are appended to the existing label of the original region. The monitoring stations are ranked consequently in main, secondary, temporary and random and located progressively at the points or sections representative for the hydro-geomorphological responses by validation control and modeling calibration. The datasets

  13. HydroShare for iUTAH: Collaborative Publication, Interoperability, and Reuse of Hydrologic Data and Models for a Large, Interdisciplinary Water Research Project

    Science.gov (United States)

    Horsburgh, J. S.; Jones, A. S.

    2016-12-01

    Data and models used within the hydrologic science community are diverse. New research data and model repositories have succeeded in making data and models more accessible, but have been, in most cases, limited to particular types or classes of data or models and also lack the type of collaborative, and iterative functionality needed to enable shared data collection and modeling workflows. File sharing systems currently used within many scientific communities for private sharing of preliminary and intermediate data and modeling products do not support collaborative data capture, description, visualization, and annotation. More recently, hydrologic datasets and models have been cast as "social objects" that can be published, collaborated around, annotated, discovered, and accessed. Yet it can be difficult using existing software tools to achieve the kind of collaborative workflows and data/model reuse that many envision. HydroShare is a new, web-based system for sharing hydrologic data and models with specific functionality aimed at making collaboration easier and achieving new levels of interactive functionality and interoperability. Within HydroShare, we have developed new functionality for creating datasets, describing them with metadata, and sharing them with collaborators. HydroShare is enabled by a generic data model and content packaging scheme that supports describing and sharing diverse hydrologic datasets and models. Interoperability among the diverse types of data and models used by hydrologic scientists is achieved through the use of consistent storage, management, sharing, publication, and annotation within HydroShare. In this presentation, we highlight and demonstrate how the flexibility of HydroShare's data model and packaging scheme, HydroShare's access control and sharing functionality, and versioning and publication capabilities have enabled the sharing and publication of research datasets for a large, interdisciplinary water research project

  14. Small hydroelectric power plants - shelf goods or tailor-made?

    International Nuclear Information System (INIS)

    Aas, Trond R.

    2002-01-01

    If small hydroelectric power plants are defined to be hydroelectric power plants of up to a few 1000 kW, they should be shelf goods because of cost considerations. Design of small hydroelectric power plants is a many-sided optimization task, on a level with constructing larger hydro power plants. But the budget for a small hydro power plant does not permit any comprehensive evaluations. The most important costs are the one-time costs in the form of investments and the following annual costs in the form of operation and maintenance, and losses. Financing costs are not considered in this article

  15. A tale of three hydros - post-privatisation in Patagonia

    International Nuclear Information System (INIS)

    Smith, H.F.

    1994-01-01

    When Argentina's state-owned utility, operating in northern Patagonia, sold off hydro-electric generating plants in 1993, they were bought by several North American utility companies. This article looks at the problems these companies encountered and examines whether the enterprise has shown itself to be economically valuable. (UK)

  16. Environmental-impact assessment of hydro-power in Egypt

    International Nuclear Information System (INIS)

    Rashad, S.M.; Ismail, M.A.

    2000-01-01

    The environmental impact of energy production and use with the associated emissions of greenhouse gases, particularly CO 2 , has created much attention and growing concern at both national and international levels. In Egypt, efforts have been directed to incorporate the environment-protection issues within the overall planning of the energy sector, as appropriate to its national commitment and its techno-economic considerations. Over the past decade, 1985-1995, hydro-power had contributed between 28 and 22% of the total energy produced by Egyptian power-plants, while the contribution of the hydro capacity was between 32.4 and 21.5%. Many studies have been carried out on the impacts of the Aswan High Dam on various aspects of the environment. An objective evaluation of the Dam, based on 25 years of operational data, indicated that it has overall been positive even though it has contributed to some environmental problems. These problems, however, are significantly less than most people originally expected. This paper deals with the review and analysis of the detrimental effects of hydro-power in Egypt. An evaluation will be given of the emissions of greenhouse gases from the whole hydro-chain. (Author)

  17. BC Hydro's transmission business : transition to a competitive marketplace

    International Nuclear Information System (INIS)

    Threlkeld, R.J.

    1998-01-01

    Progress made by BC Hydro to facilitate the use of the transmission system for wholesale electricity transactions, including the separation of the system operation function from generation and merchant functions, was discussed. BC Hydro, Canada's third largest electric utility, was the first Canadian utility to offer open access to its transmission system for wholesale transactions. The utility has an installed generating capacity of about 10.8 gigawatts, 90 per cent of which is hydroelectric. The remainder is thermal, gas turbine and stationary and mobile diesel generation. The key element in establishing wholesale transmission transactions was the FERC-mandated open access same-time information system (OASIS) on which BC Hydro posts available transmission capacity, planned outages and pricing. The system operates on BC Hydro's internet node and interfaces to a Transmission Scheduling System (TSS). The TSS was developed in-house to handle the increased complexity of scheduling multiple energy and capacity transactions for users of the transmission system. Operation of the system and the challenge to constantly improve it were discussed

  18. Asymptotic study of a magneto-hydro-dynamic system

    International Nuclear Information System (INIS)

    Benameur, J.; Ibrahim, S.; Majdoub, M.

    2003-01-01

    In this paper, we study the convergence of solutions of a Magneto-Hydro-Dynamic system. On the torus T 3 , the proof is based on Schochet's methods, whereas in the case of the whole space R 3 , we use Strichartz's type estimates. (author)

  19. Experimental condition in the preparation of catalysts for Hydro treatment

    International Nuclear Information System (INIS)

    Gomez P, Alvaro

    1998-01-01

    In this work, by means of an exhaustive bibliographical revision and in a methodical way, they seek to settle down, the characteristics of the catalysts for Hydro treatment (HDT) on those that it is necessary to act with the purpose of obtaining more active, selective and resistant catalysts to the deactivation

  20. The Statoil/Hydro fusion in a continental shelf perspective

    International Nuclear Information System (INIS)

    Osmundsen, Petter

    2007-01-01

    The article analysis the consequences of the Statoil/Hydro merger on the development on the Norwegian continental shelf. Various indicators of results of the market power the merger are presented and the effects of reduced competition on the markets are discussed. The advantages of the merger on the activities on the shelf are analyzed. (tk)

  1. Fuzzy interpolation of hydro power sales data in Simulink

    DEFF Research Database (Denmark)

    Jantzen, Jan; Eliasson, B.

    1994-01-01

    The problem in this case study can be described as a multi-dimensional surface fit to a given set of data. The data are sales figures in MWH/H for a hydro-thermal power generation system. The data are incomplete and not totally reliable. A model with ten fuzzy rules fits the data with a total error...

  2. Hydrological Modeling in Alaska with WRF-Hydro

    Science.gov (United States)

    Elmer, N. J.; Zavodsky, B.; Molthan, A.

    2017-12-01

    The operational National Water Model (NWM), implemented in August 2016, is an instantiation of the Weather Research and Forecasting hydrological extension package (WRF-Hydro). Currently, the NWM only covers the contiguous United States, but will be expanded to include an Alaska domain in the future. It is well known that Alaska presents several hydrological modeling challenges, including unique arctic/sub-arctic hydrological processes not observed elsewhere in the United States and a severe lack of in-situ observations for model initialization. This project sets up an experimental version of WRF-Hydro in Alaska mimicking the NWM to gauge the ability of WRF-Hydro to represent hydrological processes in Alaska and identify model calibration challenges. Recent and upcoming launches of hydrology-focused NASA satellite missions such as the Soil Moisture Active Passive (SMAP) and Surface Water Ocean Topography (SWOT) expand the spatial and temporal coverage of observations in Alaska, so this study also lays the groundwork for assimilating these NASA datasets into WRF-Hydro in the future.

  3. Hydro-Quebec International : taking up the challenges of globalization

    International Nuclear Information System (INIS)

    Carpentier, J.M.

    1997-01-01

    With the ever increasing demand for electricity, it is estimated that the world''s electrical generating capacity will grow by about 1,000,000 MW over the next eight years. This represents a 40 per cent increase over today''s capacity. Hydro-Quebec is determined to stake its place in international markets and to maximize the profits from the strong expertise gained during the construction of Quebec''s major electric facilities. The venture into international markets is primarily a commercial strategy. To that effect, Hydro-Quebec plans to invest up to $300 million in international projects around the world so that after five years it can have major interests and assets totaling $12 billion or more. China, North Africa and the Middle East are some of the market that Hydro-Quebec wishes to enter in the years ahead. The Eastern European and Southeast Asian markets are also worthy of interest. It was pointed out that Hydro-Quebec is not the only large electric utility turning to world market to pursue its growth. French, Spanish and American companies are also presently investing billions of dollars in the world market

  4. The radiation safety self-assessment program of Ontario Hydro

    International Nuclear Information System (INIS)

    Armitage, G.; Chase, W.J.

    1987-01-01

    Ontario Hydro has developed a self-assessment program to ensure that high quality in its radiation safety program is maintained. The self-assessment program has three major components: routine ongoing assessment, accident/incident investigation, and detailed assessments of particular radiation safety subsystems or of the total radiation safety program. The operation of each of these components is described

  5. Hydro-Quebec International : taking up the challenges of globalization

    Energy Technology Data Exchange (ETDEWEB)

    Carpentier, J.M.

    1997-12-31

    With the ever increasing demand for electricity, it is estimated that the world`s electrical generating capacity will grow by about 1,000,000 MW over the next eight years. This represents a 40 per cent increase over today`s capacity. Hydro-Quebec is determined to stake its place in international markets and to maximize the profits from the strong expertise gained during the construction of Quebec`s major electric facilities. The venture into international markets is primarily a commercial strategy. To that effect, Hydro-Quebec plans to invest up to $300 million in international projects around the world so that after five years it can have major interests and assets totaling $12 billion or more. China, North Africa and the Middle East are some of the market that Hydro-Quebec wishes to enter in the years ahead. The Eastern European and Southeast Asian markets are also worthy of interest. It was pointed out that Hydro-Quebec is not the only large electric utility turning to world market to pursue its growth. French, Spanish and American companies are also presently investing billions of dollars in the world market.

  6. Hydro-carbon liquid for use in motors

    Energy Technology Data Exchange (ETDEWEB)

    Cobbett, G T.B.

    1907-03-15

    A process for the manufacture of liquid hydro-carbon mixtures suitable as a fuel for internal-combustion engines is disclosed, which consists in dissolving a suitable quantity of shale oil, which has been purified with sulfuric acid, in petroleum spirit, then purifying the solution with sulfuric acid and subsequently with oxalic acid or other suitable decolorizing agent.

  7. Fifteen years of radioactive waste management at Ontario Hydro

    International Nuclear Information System (INIS)

    Carter, T.J.; Rao, P.K.M.

    1985-01-01

    Ontario Hydro is a large Canadian utility producing 84% (7394 MWe) of the Nuclear Electricity generated in Canada. The low- and intermediate-level radioactive wastes generated by the Ontario Hydro program are currently being managed at the Bruce Nuclear Power Development with various volume reduction, packaging and interim storage systems. Ontario Hydro also owns and operates a radioactive waste transportation system. Studies are in progress for final disposal of these wastes in a suitable geology in Ontario. Since its inception in 1971, Ontario Hydro's radioactive waste management program has evolved into providing a full fledged radioactive waste management capability to the utility's two nuclear generation centres at Pickering and Bruce, and later in the decade, to Darlington. This paper summarizes the various developments in this program; highlights the major facilities both in-service and planned to be built; reviews the experiences gained over fifteen years of in-house waste management; and discusses the proposed reorientation towards ultimate disposal of these wastes. 2 refs., 8 figs., 1 tab

  8. Exploration of hydro-geomorphological indices for coastal floodplain ...

    African Journals Online (AJOL)

    Flood is a reoccurring natural hazard in many parts of Nigeria, and is likely to increase in severity and frequency. Characterization of recently flooded areas was carried out using hydro-morphological indices to identify flood prone areas. In flood risk quantification and identification, hydrodynamic models require vast ...

  9. Your energy team : Hydro Mississauga 1998 annual report

    International Nuclear Information System (INIS)

    1999-01-01

    An operational and financial review of Hydro Mississauga for fiscal year 1998 is presented. Hydro Mississauga has been serving the municipality of Mississauga, Ontario for the past 82 years. In 1998, Hydro Mississauga went through major restructuring to include a new competitive 'Services' Division which offers a wide range of competitive products and services. Despite deregulation and restructuring, quality of service was maintained and all-time performance records were set for company safety and system reliability. Operating costs were also cut and low rates continued. The residential rate freeze will be extended for a sixth straight year into 1999. Consolidated financial statements show that in 1998 Hydro Mississauga was 100 per cent debt free. One of the top priorities for the utility in 1998 was to get ready to deal with any problem that might arise as we roll over into the year 2000. The utility has completed an inventory of all computer software and equipment and has taken measures such as remediation, testing and getting vendor assurances. tabs., figs

  10. Comparison between MPC and PID control for compact hydro ...

    African Journals Online (AJOL)

    This paper presents water temperature of a hydro distillation that have been modelled by using linear ARX Modal. Based on the modal obtained, a model predictive controller and PID controller have been developed. Both controller undergone the performance of controller tests that includes set point, set point change and ...

  11. Final Report - Wind and Hydro Energy Feasibility Study - June 2011

    Energy Technology Data Exchange (ETDEWEB)

    Jim Zoellick; Richard Engel; Rubin Garcia; Colin Sheppard

    2011-06-17

    This feasibility examined two of the Yurok Tribe's most promising renewable energy resources, wind and hydro, to provide the Tribe detailed, site specific information that will result in a comprehensive business plan sufficient to implement a favorable renewable energy project.

  12. Unbalance influence on the rotating assembly dynamics of a hydro

    Science.gov (United States)

    Jurcu, M.; Pădureanu, I.; Campian, C. V.; Haţiegan, C.

    2018-01-01

    The dynamics of the rotating parts of a hydro is characterized by the dynamic interaction between the rotor, the stator and the working fluid in order to operate the hydro. The main factors influencing the dynamics of the rotating parts of a hydro are: rotor unbalance, unbalanced magnetic pull, shaft misalignment and hydraulic flow regime. Rotor unbalanced is one of the most common factors influencing the dynamic stability of the rotating parts of a hydro. The unbalanced is determined by: uneven distribution of rotating masses, displacement of parts in the rotor during rotation, inhomogeneity of rotor component materials, expansion of the rotor due to heating, and rising speed during the transient discharge of the load. The mechanical imbalance of a rotor can lead to important forces, responsible for the vibration of the machine, which ultimately leads to a shorter operating time. Even a low unbalance can lead, in the case of high speed machines, to major unbalance forces that cause significant damage to the equipment. The unbalance forces cause additional vibrations in the bearings as well as in the foundation plate. To avoid these vibrations, it is necessary in the first stage to balance the static rotor in the construction plant and then to a dynamic rotation balancing.

  13. Asymptotic study of a magneto-hydro-dynamic system

    Energy Technology Data Exchange (ETDEWEB)

    Benameur, J [Institut Preparatoire aux Etudes d' Ingenieurs de Monastir (Tunisia); Ibrahim, S [Faculte des Sciences de Bizerte, Departement de Mathematiques, Bizerte (TN); [Abdus Salam International Centre for Theoretical Physics, Trieste (Italy)]. E-mail: slim.ibrahim@fsb.rnu.tn; Majdoub, M [Faculte des Sciences de Tunis, Departement de Mathematiques, Tunis (Tunisia)

    2003-01-01

    In this paper, we study the convergence of solutions of a Magneto-Hydro-Dynamic system. On the torus T{sup 3}, the proof is based on Schochet's methods, whereas in the case of the whole space R{sup 3}, we use Strichartz's type estimates. (author)

  14. Statistical variability of hydro-meteorological variables as indicators ...

    African Journals Online (AJOL)

    Statistical variability of hydro-meteorological variables as indicators of climate change in north-east Sokoto-Rima basin, Nigeria. ... water resources development including water supply project, agriculture and tourism in the study area. Key word: Climate change, Climatic variability, Actual evapotranspiration, Global warming ...

  15. Report of the special prosecutor: BC Hydro 'Raiwind' project

    International Nuclear Information System (INIS)

    Fraser, P. D. K.

    1999-10-01

    A special prosecutor has been appointed by the British Columbia Government to assist the Royal Canadian Mounted Police (RCMP) in its investigation, and to render appropriate charging decisions in the matter of the circumstances surrounding the creation of IPC International Power Corporation (IPC) owned by a Mr. John N. Laxton, former Chairman of BC Hydro and his two children, and its joint venture with BC Hydro for the development of an international power project in Pakistan known as the Raiwind project. Of particular concerns were the conflict of interest breached by Mr. Laxton in loaning a substantial sum of money to a principal member of the Pakistani side of the joint venture, and by the former President and CEO of BC Hydro, Mr. John Sheehan, by his purchase of shares of IPC by a company owned by members of his family. In 1996 Mr. Sheehan's employment as President and CEO was terminated by BC Hydro for breaching internal conflict of interest guidelines and for failing to get approval from BC Hydro for the acquisition of IPC shares. Subsequently, Mr. Sheehan commenced an action against BC Hydro for wrongful dismissal, a claim which was upheld by the Supreme Court of British Columbia. The focus of the special prosecutor's criminal investigation ultimately became the conduct of Mr. Laxton and whether a charge could or should be laid under Section 122 of the Criminal Code. The outcome of his investigation, which is discussed in this report, was that there was no substantial likelihood of conviction under the breach or trust provisions of Section 122 with respect to the indirect purchases by Mr. Laxton of shares in IPC. Nor was there any reason to believe that a personal loan made in high-risk circumstances could be a benefit or advantage to the lender. Furthermore, the loan cannot be causally related to any loss or financial harm to BC Hydro. In fact, it could be argued that Mr. Laxton's private decision to make the loan was of real assistance in ensuring that the

  16. Energy supply technologies. Hydro, ocean, wave and tidal

    Energy Technology Data Exchange (ETDEWEB)

    Fenhann, J.; Larsen, Hans [Risoe National Lab. - DTU (Denmark)

    2007-11-15

    This chapter presents an overview of current hydro, ocean, wave and tidal initiatives. Large hydro remains one of the lowest-cost generating technologies, although environmental constraints, resettlement impacts and the limited availability of sites have restricted further growth in many countries. Large hydro supplied 16 % of global electricity in 2004, down from 19 % a decade ago. Large hydro capacity totalled about 720 GW worldwide in 2004 and has grown historically at slightly more than 2 % annually. China installed nearly 8 GW of large hydro in 2004, taking the country to number one in terms of installed capacity (74 GW). With the completion of the Three Gorges Dam, China will add some 18.2 GW of hydro capacity in 2009. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic cost of hydro includes displacements and submergence. Further hydro can improve peak-capacity management. Ocean currents, some of which runs close to European coasts, carry a lot of kinetic energy. Part of this energy can be captured by sub-marine windmills and converted into electricity. These are more compact than the wind turbines used on land, simply because water is much denser than air. The main European countries with useful current power potential are France and the UK. Ocean tides are driven by the gravitational pull of the moon. With one high tide every 12 hours, a tidal power plant can operate for only four or five hours per cycle, so power from a single plant is intermittent. A suitably-designed tidal plant can, however, operate as a pimped storage system, using electricity during periods of low demand to store energy that can be recovered later. The only large, modern example of a tidal power plant is the 240 MW La Rance plant, built in France in the 1960s, which represents 91 % of the world tidal power capacity. Wave energy can be seen as

  17. CDM pilot project to stimulate market for family-hydro for low-income households

    International Nuclear Information System (INIS)

    2004-01-01

    Over 100,000 low-income households living in rural, rice-farming regions of Vietnam and China rely upon family-hydro (between 100 and 200W) as the only affordable means of obtaining electricity. These systems are used for domestic lighting, radio and, in some cases, televisions. The units are small, cheap and are usually installed and owned by a single family. Funding from the CDM could be utilised in order to reduce the cost of good quality equipment to provide low-income households living in isolated off-grid locations with an affordable and sustainable electricity supply which can meet their needs for lighting, educational, productive and recreational uses. Therefore research was needed to determine the level of carbon emission reductions resulting from their use. The successful acceptance by the Prototype Carbon Fund (PCF) of the methodology of establishing the benchmark developed during this project could then be used as a precedent by other project developers in the future, thus being of long-term support to the emerging family-hydro industry. (author)

  18. Hydro-Quebec proudly celebrates 50 years of service

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    The history of the electric utility Hydro-Quebec is reviewed from its creation in 1944 as the Hydroelectric Commission of Quebec. The utility inherited an installed capacity of 696 MW and it first went about standardizing electricity supply conditions and establishing equal rates in the Montreal area. It began major construction projects in the mid-1950s with the Bersimis and Carillon hydroelectric plants. By 1962, installed capacity reached 3,657 MW. In 1963, Hydro-Quebec bought 10 private electricity distribution companies, 45 cooperatives, and a series of private or municipal systems. In 1965, the utility commissioned the world's first 735-kV transmission line. In 1967, Hydro-Quebec opened its research institute, and another laboratory specializing in electrotechnologies was opened in 1987. The 1970s were noted for the James Bay hydroelectric projects, the development of which was eventually governed by the landmark James Bay and Northern Quebec Agreement of 1975. Electricity exports greatly expanded in the 1970s and early 1980s as larger hydroelectric projects came on stream. Challenges of the 1990s include service quality, environmental issues, energy efficiency, and conservation. Hydro-Quebec's Energy Efficiency Project has a target of annual savings of 9.3 TWh by the year 2000. Energy efficiency and power system upgrading are priorities for serving future customer needs. Hydro-Quebec continues to promote hydroelectric power as the cheapest, most environmentally benign form of energy and future generating stations in progress include phase II of the LaGrande complex (to be completed 1996). 2 figs

  19. Distributionally robust hydro-thermal-wind economic dispatch

    International Nuclear Information System (INIS)

    Chen, Yue; Wei, Wei; Liu, Feng; Mei, Shengwei

    2016-01-01

    Highlights: • A two-stage distributionally robust hydro-thermal-wind model is proposed. • A semi-definite programing equivalent and its algorithm are developed. • Cases that demonstrate the effectiveness of the proposed model are included. - Abstract: With the penetration of wind energy increasing, uncertainty has become a major challenge in power system dispatch. Hydro power can change rapidly and is regarded as one promising complementary energy resource to mitigate wind power fluctuation. Joint scheduling of hydro, thermal, and wind energy is attracting more and more attention nowadays. This paper proposes a distributionally robust hydro-thermal-wind economic dispatch (DR-HTW-ED) method to enhance the flexibility and reliability of power system operation. In contrast to the traditional stochastic optimization (SO) and adjustable robust optimization (ARO) method, distributionally robust optimization (DRO) method describes the uncertain wind power output by all possible probability distribution functions (PDFs) with the same mean and variance recovered from the forecast data, and optimizes the expected operation cost in the worst distribution. Traditional DRO optimized the random parameter in entire space, which is sometimes contradict to the actual situation. In this paper, we restrict the wind power uncertainty in a bounded set, and derive an equivalent semi-definite programming (SDP) for the DR-HTW-ED using S-lemma. A delayed constraint generation algorithm is suggested to solve it in a tractable manner. The proposed DR-HTW-ED is compared with the existing ARO based hydro-thermal-wind economic dispatch (AR-HTW-ED). Their respective features are shown from the perspective of computational efficiency and conservativeness of dispatch strategies.

  20. Hydro-Quebec : annual report 1998 : for today and tomorrow

    International Nuclear Information System (INIS)

    1999-01-01

    Hydro-Quebec is a publicly owned company with a single shareholder, the Quebec government. In 1998, the utility had over 31,400 MW in installed capacity, ranking it among North America's largest distributors of electrical energy. This report provides a review of progress and financial highlights including revenue, expenditure, financial expenses, net income, total assets, long term debt, shareholder's equity and the overall financial position of the utility. In 1998 sales totaled 161.4 TWh, with Quebec markets accounting for more than 88 percent and sales, outside Quebec accounting for 11.5 per cent. Three factors related to weather impacted the utility in 1998. The first was mild weather which brought down domestic and agricultural power consumption by 3 TWh compared with the average recorded in the past half-century. The second was low precipitation which caused Hydro-Quebec to turn to means other than hydroelectric generation to supply power to Quebec customers. These included start-up generation of the Tracy thermal generating station, reduction of sales on short-term markets outside Quebec, and electricity purchases on external markets. The third factor was the ice storm of January 1998, which caused significant damage to part of Hydro-Quebec's transmission and distribution systems. Throughout the year, Hydro-Quebec worked in reinforcing its power lines to prevent repetition of the devastation that occurred during the ice storm. In spite of the events of January 1998, the Utility remains committed to the growth and profitability orientations laid out in its Strategic Plan for 1998-2002. Significant progress was made in consolidating the Utility's position in international markets. Productive partnerships have been established with the Quebec Federation of Labour Solidarity Fund, and with Gaz de France. A network of international partners in a score of countries also has been developed. Hydro-Quebec has completed most of its preparations for Year 2000 readiness

  1. A hydro-optical model for deriving water quality variables from satellite images (HydroSat): A case study of the Nile River demonstrating the future Sentinel-2 capabilities

    NARCIS (Netherlands)

    Salama, M.; Radwan, M.; van der Velde, R.

    2012-01-01

    This paper describes a hydro-optical model for deriving water quality variables from satellite images, hereafter HydroSat. HydroSat corrects images for atmospheric interferences and simultaneously retrieves water quality variables. An application of HydroSat to Landsat Enhanced Thematic Mapper (ETM)

  2. Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration: Hydro power flexibility for power systems

    Energy Technology Data Exchange (ETDEWEB)

    Huertas-Hernando, Daniel [Department of Energy Systems, SINTEF, Trondheim Norway; Farahmand, Hossein [Department of Electric Power Engineering, Norwegian University of Science and Technology (NTNU), Trondheim Norway; Holttinen, Hannele [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Kiviluoma, Juha [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Rinne, Erkka [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Söder, Lennart [Department of Electrical Engineering, KTH University, Stockholm Sweden; Milligan, Michael [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Ibanez, Eduardo [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Martínez, Sergio Martín [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Gomez-Lazaro, Emilio [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Estanqueiro, Ana [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Rodrigues, Luis [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Carr, Luis [Research Association for Energy Economics (FfE GmbH), Munich Germany; van Roon, Serafin [Research Association for Energy Economics (FfE GmbH), Munich Germany; Orths, Antje Gesa [Energinet.dk, Fredericia Denmark; Eriksen, Peter Børre [Energinet.dk, Fredericia Denmark; Forcione, Alain [Hydro Quebec, Montréal Canada; Menemenlis, Nickie [Hydro Quebec, Montréal Canada

    2016-06-20

    Hydro power is one of the most flexible sources of electricity production. Power systems with considerable amounts of flexible hydro power potentially offer easier integration of variable generation, e.g., wind and solar. However, there exist operational constraints to ensure mid-/long-term security of supply while keeping river flows and reservoirs levels within permitted limits. In order to properly assess the effective available hydro power flexibility and its value for storage, a detailed assessment of hydro power is essential. Due to the inherent uncertainty of the weather-dependent hydrological cycle, regulation constraints on the hydro system, and uncertainty of internal load as well as variable generation (wind and solar), this assessment is complex. Hence, it requires proper modeling of all the underlying interactions between hydro power and the power system, with a large share of other variable renewables. A summary of existing experience of wind integration in hydro-dominated power systems clearly points to strict simulation methodologies. Recommendations include requirements for techno-economic models to correctly assess strategies for hydro power and pumped storage dispatch. These models are based not only on seasonal water inflow variations but also on variable generation, and all these are in time horizons from very short term up to multiple years, depending on the studied system. Another important recommendation is to include a geographically detailed description of hydro power systems, rivers' flows, and reservoirs as well as grid topology and congestion.

  3. The political economy of Canadian hydro-electricity : between old provincial hydros and neoliberal regional energy regimes

    International Nuclear Information System (INIS)

    Netherton, A.

    2007-01-01

    In economic terms, hydro-electricity is considered as a quasi-staple, as it prone to the classic staples problem of excess capacity. However, neither water nor hydroelectricity in Canada is produced primarily for export markets. Hydroelectric systems are often thought of as politicized monopolies. This paper discussed changes that have occurred in hydroelectric organizations over time, as they have been governed by a formative mixed regime; postwar provincial hydro systems; a megaprojects regime; and an emerging sustainability regionalization regime. The origins of electricity generation and transmission in Canada were discussed, as well as the ecological footprint of large mega-projects on rivers. The development of provincial hydro monopolies during the mid- to late- twentieth century was also outlined, as well as the sustainability and regionalization regime that developed after 1990. During the mature staples period of the mid-century, rents in hydro-electric organizations were distributed through cheap rates to subsidize and facilitate the development of mass production and mass consumption. However, post-staples consumption has now replaced mass consumption, and demand side management is replacing earlier cheap power policies. Nonetheless, the lack of systematic integration of networks has led to inefficiencies. Provincial grids are now being integrated into interconnected North American regional networks regulated by the United States. It was concluded that the Canadian electricity regime is increasingly influenced by the the supranational role that the United States is playing in structuring markets. 83 refs

  4. Behaviour and passage of European silver eels (Anguilla anguilla at a small hydropower plant during their downstream migration Comportement et passage de l’anguille argentée (Anguilla anguilla au niveau d’une petite centrale hydroélectrique lors de sa migration de dévalaison

    Directory of Open Access Journals (Sweden)

    De-Oliveira E.

    2010-09-01

    Full Text Available Between 2004 and 2007, 116 downstream migrant silver eels (Anguilla anguilla were monitored at a hydropower plant on the Gave de Pau river in South-West France using radio and PIT telemetry. The objectives of the study were: (i to determine the environmental conditions when eels arrived and passed the facility; (ii to determine the rate of eel escapement (passage other than via the turbines; (iii to describe the behaviour of eels faced with the intake structure and the permeability of the intake trashracks for the different sizes of eel; and (iv to determine whether surface bypasses originally designed for salmon could be effective for eels. Five types of behaviour of silver eels in the forebay and at the plant intakes were identified. The study showed the key factor influencing both eel behaviour and the route taken through the plant was variation in river discharge. Escapement rate was related to eel length and the spill flow to river flow ratio, which could be described by a logistic regression model. The surface bypasses originally designed for salmon were found to aid downstream eel migration significantly. At velocities < 0.40 m·s−1, no eels, even the largest, for which the racks are a physical barrier, were found impinged on the trashracks. De 2004 à 2007, une étude sur la migration de dévalaison de l’anguille argentée européenne (Anguilla anguilla a été menée sur la centrale hydroélectrique de Baigts sur le Gave de Pau dans le Sud-Ouest de la France. Cette étude, au cours de laquelle 116 individus ont été suivis par télémétrie PIT et radio, avait pour objectifs : (i de déterminer les conditions de milieu propices à l’arrivée sur site et au franchissement de l’aménagement; (ii de déterminer les taux d’échappement (passages par des voies autres que les turbines; (iii d’analyser le comportement des anguilles devant les ouvrages et la perméabilité des grilles de la prise d’eau en fonction de la taille

  5. Reflections on Teaching a Large Class.

    Science.gov (United States)

    Miner, Rick

    1992-01-01

    Uses an analysis of small- and large-class differences as a framework for planning for and teaching a large class. Analyzes the process of developing and offering an organizational behavior class to 141 college students. Suggests ways to improve teaching effectiveness by minimizing psychological and physical distances, redistributing resources,…

  6. Thermo-hydro-mechanical behavior of argillite

    International Nuclear Information System (INIS)

    Tran, Duy Thuong; Dormieux, Luc; Lemarchand, Eric; Skoczylas, Frederic

    2012-01-01

    Document available in extended abstract form only. Argillite is a very low permeability geo-material widely encountered: that is the reason why it is an excellent candidate for the storage of long-term nuclear waste depositories. This study focuses on argillites from Meuse-Haute-Marne (East of France) which forms a geological layer located approximately 400 m and 500 m depth. We know that this material is made up of a mixture of shale, quartz and calcite phases. The multi-scale definition of this material suggests the derivation of micro-mechanics reasonings in order to better account for the mechanisms occurring at the local (nano and micro-) scale and controlling the macroscopic mechanical behavior. In this work, up-scaling techniques are used in the context of thermo-hydro-mechanical couplings. The first step consists in clarifying the morphology of the microstructure at the relevant scales (particles arrangement, pore size distribution) and identifying the mechanisms that take place at those scales. These local informations provide the input data of micro-mechanics based models. Schematic picture of the microstructure where the argillite material behaves as a dual-porosity, with liquid in both micro-pores and interlayer space in between clay solid platelets, seems a reasonable starting point for this micro-mechanical modelling of clay. This allows us to link the physical phenomena (swelling clays) and the mechanical properties (elastic moduli, Poisson's ratio). At the pressure applied by the fluid on the solid platelets appears as the sum of the uniform pressure in the micro-pores and of a swelling overpressure depending on the distance between platelets and on the ion concentration in the micro-pores. The latter is proved to be responsible for a local elastic modulus of physical origin. This additional elastic component may strongly be influenced by both relative humidity and temperature. A first contribution of this study is to analysing this local elastic

  7. The effects of carbon nanotubes on electroactive shape-memory behaviors of hydro-epoxy/carbon black composite

    International Nuclear Information System (INIS)

    Wei, Kun; Zhu, Guangming; Tang, Yusheng; Liu, Tingting; Li, Ximin

    2012-01-01

    The objective of this work is to characterize the effect of multi-walled carbon nanotubes (MWCNTs) on the thermomechanical, electrical and shape-memory properties of hydro-epoxy/carbon black (CB) composite. The shape-memory hydro-epoxy composite is fabricated by adding MWCNTs and CB into shape-memory hydro-epoxy resin. The total amount of the fillers fixed at 1.9 wt%, five different composites are produced by varying the amount of MWCNTs between 0 and 0.8 wt% and the amount of CB between 1.1 and 1.9 wt%. The thermomechanical properties and shape-memory performance of the composites are studied. These results indicate that the glass transition temperature (Tg) and the storage modulus of the composites increases at first and then decreases as MWCNTs content increases. The shape recovery time decreases at first and then increases slightly as MWCNTs content increases. The composite presents good shape-memory behavior, and the shape recovery ratio is around 100%. Due to the synergic effect of CB and MWCNTs, the volume electrical resistivity of the composite could decrease by adding a small amount of MWCNTs. (paper)

  8. Many and small or large and few? A comparison of the environmental effects of different strategies for the development of hydropower plants.; Mange og smaa eller store og faa? En sammenligning av miljoevirkningene ved ulike strategier for utvikling av vannkraft.

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Tor Haakon; Sundt, Haakon; Ruud, Audun

    2012-11-01

    This study compared the cumulative environmental impact of 27 small hydro power plants to the environmental impact of an average of three large hydropower plants, which range from the small farms and the average of the major producing about as much energy. Based on the empirical basis used in this study are the environmental impacts of large hydropower fewer and less severe than the cumulative environmental impacts from the 27 small plants. The results are, however marginal in favor of big hydro power plants and suffers from uncertainties due to lack of precision in the raw data, limitations of the methodic of accumulating environmental effects of many small facilities and extensive use of discretion in the transition between the scientific description of the environmental impacts and impact classes (Statens Vegvesen, 2006). The input data in the study has primarily been published available environmental impact assessment (KU). The results must therefore be said to have limited power statement in order to draw general conclusions. The identified environmental effects are to some extent, different from the type and size, so that an individual valuation and political or administrative priorities will to a large extent determine the preferred strategy for the development of hydropower. From 2012 promoted the production stimulating action as a result of common certificate market with Sweden. Small hydro power plants has so far been a priority in Norway, but when Norway implements EU Water Framework Directive in all areas of precipitation, one should be aware of our findings, especially regarding the potential in expanding of existing hydropower plants. (auth)

  9. Modeling subsurface reactive flows using leadership-class computing

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Richard Tran [Computational Earth Sciences Group, Computer Science and Mathematics Division, Oak Ridge National Laboratory, Oak Ridge, TN 37831-6015 (United States); Hammond, Glenn E [Hydrology Group, Environmental Technology Division, Pacific Northwest National Laboratory, Richland, WA 99352 (United States); Lichtner, Peter C [Hydrology, Geochemistry, and Geology Group, Earth and Environmental Sciences Division, Los Alamos National Laboratory, Los Alamos, NM 87545 (United States); Sripathi, Vamsi [Department of Computer Science, North Carolina State University, Raleigh, NC 27695-8206 (United States); Mahinthakumar, G [Department of Civil, Construction, and Environmental Engineering, North Carolina State University, Raleigh, NC 27695-7908 (United States); Smith, Barry F, E-mail: rmills@ornl.go, E-mail: glenn.hammond@pnl.go, E-mail: lichtner@lanl.go, E-mail: vamsi_s@ncsu.ed, E-mail: gmkumar@ncsu.ed, E-mail: bsmith@mcs.anl.go [Mathematics and Computer Science Division, Argonne National Laboratory, Argonne, IL 60439-4844 (United States)

    2009-07-01

    We describe our experiences running PFLOTRAN-a code for simulation of coupled hydro-thermal-chemical processes in variably saturated, non-isothermal, porous media- on leadership-class supercomputers, including initial experiences running on the petaflop incarnation of Jaguar, the Cray XT5 at the National Center for Computational Sciences at Oak Ridge National Laboratory. PFLOTRAN utilizes fully implicit time-stepping and is built on top of the Portable, Extensible Toolkit for Scientific Computation (PETSc). We discuss some of the hurdles to 'at scale' performance with PFLOTRAN and the progress we have made in overcoming them on leadership-class computer architectures.

  10. Modeling subsurface reactive flows using leadership-class computing

    International Nuclear Information System (INIS)

    Mills, Richard Tran; Hammond, Glenn E; Lichtner, Peter C; Sripathi, Vamsi; Mahinthakumar, G; Smith, Barry F

    2009-01-01

    We describe our experiences running PFLOTRAN-a code for simulation of coupled hydro-thermal-chemical processes in variably saturated, non-isothermal, porous media- on leadership-class supercomputers, including initial experiences running on the petaflop incarnation of Jaguar, the Cray XT5 at the National Center for Computational Sciences at Oak Ridge National Laboratory. PFLOTRAN utilizes fully implicit time-stepping and is built on top of the Portable, Extensible Toolkit for Scientific Computation (PETSc). We discuss some of the hurdles to 'at scale' performance with PFLOTRAN and the progress we have made in overcoming them on leadership-class computer architectures.

  11. The hydro-mechanical modeling of the fractured media

    International Nuclear Information System (INIS)

    Kadiri, I.

    2002-10-01

    The hydro-mechanical modeling of the fractured media is quite complex. Simplifications are necessary for the modeling of such media, but, not always justified, Only permeable fractures are often considered. The rest of the network is approximated by an equivalent continuous medium. Even if we suppose that this approach is validated, the hydraulic and mechanical properties of the fractures and of the continuous medium are seldom known. Calibrations are necessary for the determination of these properties. Until now, one does not know very well the nature of measurements which must be carried out in order to carry on a modeling in discontinuous medium, nor elements of enough robust validation for this kind of modeling. For a better understanding of the hydro-mechanical phenomena in fractured media, two different sites have been selected for the work. The first is the site of Grimsel in Switzerland in which an underground laboratory is located at approximately 400 m of depth. The FEBEX experiment aims at the in-situ study of the consecutive phenomena due to the installation of a heat source representative of radioactive waste in the last 17 meters of the FEBEX tunnel in the laboratory of Grimsel. Only, the modeling of the hydro-mechanical of the excavation was model. The modeling of the Febex enabled us to establish a methodology of calibration of the hydraulic properties in the discontinuous media. However, this kind of study on such complex sites does not make possible to answer all the questions which arise on the hydro-mechanical behavior of the fractured media. We thus carried out modeling on an other site, smaller than the fist one and more accessible. The experimental site of Coaraze, in the Maritime Alps, is mainly constituted of limestone and fractures. Then the variation of water pressure along fractures is governed by the opening/closure sequence of a water gate. Normal displacement as well as the pore pressure along these fractures are recorded, and then

  12. The passive system for reflooding of the VVER reactor core from the second-stage hydro-accumulators: design and basic design solutions

    International Nuclear Information System (INIS)

    Alexandr D Efanov; Sergey G Kalyakin; Andrey V Morozov; Oleg V Remizov; Vladimir M Berkovich; Victor N Krushelnitskiy; Vladimir G Peresadko; Yuri G Dragunov; Alexey K Podshibyakin; Sergey I Zaitcev

    2005-01-01

    Full text of publication follows: The fundamental difference in the safety assurance of the operating NPPs and those under design implies that the safety in the existing NPPs is achieved by energy-dependent (active) systems and depends on the proficiency of attending personnel. To provide safety, the new NPP designs use the physical processes proceeding in the facility without power supply; and they are unaffected by human errors. As to the safety level, the design of the new generation nuclear power plant NPP-92 relates to the class of the improved NPPs; and it applies a principle of diversity in the structure of systems responsible for critical safety functions. In accordance with the above-mentioned safety concept, the design development required a complex of experimental investigations and numerical modeling to be conducted. Among the passive safety systems of the NPP with RP-392 is the system of the second stage hydro-accumulators (GE-2). The system of the second-stage hydro-accumulators consists of four groups of hydro-accumulating tanks with a total coolant volume of 960 m 3 . The system is intended for the core flooding with coolant during 24 hours. In each group of the hydro-accumulators, the graded coolant flowrate is provided, which depends on residual heat in the reactor. The special check valves are tuned to open at the pressure drop in the circuit below 1.5 MPa. The paper presents the thermalhydraulic substantiation of the serviceability of the second-stage hydro-accumulators system for passive heat removal from the VVER reactor core and the basic design solutions on the GE-2 system. (authors)

  13. Financial profile of Hydro-Quebec : 1998-2001

    International Nuclear Information System (INIS)

    1999-01-01

    Hydro-Quebec is a publicly owned company with a single shareholder, the Quebec government. It is ranked among North America's largest distributors of green energy. This report provides financial highlights including revenue, expenditure, net income, total assets, long term debt, shareholder's equity and the financial position of the utility. Operating statistics are also provided. This includes electricity sold both in and out of Quebec, total installed capacity, peak requirements for winter, total number of customer accounts, and the number of permanent employees. Because of the January ice storm, Hydro-Quebec's major priority in 1998 was to reinforce its transmission and distribution system to meet customer expectations. From February to December 1998, about 3,000 km of line were built, rebuilt or consolidated. By 2001, the utility will have looped several of its high-voltage transmission systems. Plans are also underway to build four new high-voltage lines and an interconnection with Ontario, using advanced technologies. tabs., figs

  14. Comparison of Ontario Hydro's performance with world power reactors - 1981

    International Nuclear Information System (INIS)

    Dumka, B.R.

    1982-04-01

    The performance of Ontario Hydro's CANDU reactors in 1981 is compared with that of 123 world nuclear power reactors rated at 500 MW(e) or greater. The report is based on data extracted from publications, as well as correspondence with a number of utilities. The basis used is the gross capacity factor, which is defined as gross unit generation divided by the perfect gross output for the period of interest. The lowest of the published turbine and generator design ratings is used to determine the perfect gross output, unless the unit has been proven capable of consistently exceeding this value. The first six reactors in the rankings were CANDU reactors operated by Ontario Hydro

  15. Hydro to market green power at special prices

    International Nuclear Information System (INIS)

    McArthur, D.; Salaff, S.

    1996-01-01

    A 600 kW grid-connected demonstration wind turbine at Ontario Place will provide green power to Toronto residents early in 1997. The joint venture project partners include publicly owned Ontario Hydro, Toronto Hydro and Natural Resources Canada. The power will be sold at a premium under arrangements yet to be announced. The green power pricing initiative would allow some customers to buy their electricity at a green price. The project could be a self-financing model for future renewable energy development. The Ontario Place turbine project will determine whether Toronto electricity customers want green power or electricity from nuclear and fossil stations, and could determine which type of generation should be built in the future

  16. New avenues in cobalt-60 production at Ontario Hydro

    International Nuclear Information System (INIS)

    Mylvaganam, C.K.; Ronchka, R.A.

    1990-01-01

    Ontario Hydro produces cobalt-60 in the control rods of twelve power reactors. These reactors have a typical flux of 2 x 10 14 neutrons/cm 2 /s, making them efficient producers of cobalt-60. Current annual production is 45 million curies. Since the primary function of these reactors is the production of electricity, their flexibility to meet the needs of commercial cobalt production by the control rod route is limited. Ontario Hydro is therefore developing innovative production techniques, making use of the CANDU reactor's unique ability to be fuelled on-power. These techniques will enable production to better respond to the market's requirements for quantity and specific activity. As it is supplementary to control rod production, annual supply could potentially reach 165 million curies. (author)

  17. Economic impact of Hydro-Quebec's nuclear activities

    International Nuclear Information System (INIS)

    Emard, R.

    1994-01-01

    Gentilly 2 nuclear power plant has benefited the regions of Becancour and Trois Rivieres, with spin-off at the provincial level. Gentilly 2 is Hydro Quebec's only nuclear plant. Its 675 MW provide nearly 3% of Hydro Quebec's production. Over 664 permanent jobs were created, 70% of them highly specialized and multi-skilled. In 1993, out of C$99 spent, 57.3 were for wages, 16.3 for equipment and supplies (including fuel and heavy water), 18 for professional services provided by AECL and others, and the remainder included fees, permits, contract work, and miscellaneous. Gentilly 2 has fostered technological development and inventions which are used at other CANDU stations. 7 ills

  18. An environmental data base for all Hydro-Quebec reservoirs

    International Nuclear Information System (INIS)

    Demers, C.

    1988-01-01

    Hydro-Quebec has created two management positions specifically for reservoirs, namely Reservoir Ecology Advisor and Reservoir Management Advisor. To assist management decisions, a means was required of bringing together all existing environmental information for each reservoir operated by Hydro-Quebec, including storage reservoirs, auxiliary reservoirs and forebays. A relational database using Reflex software was developed on a network of Macintosh computers. The database contains five blocks of information: general information, and physical, physiochemical, biologic and socioeconomic characteristics for each reservoir. Data will be collected on over 100 sites, and the tool will form the basis for developing a medium-range study program on reservoir ecology. The program must take into account the physical, biological and socioeconomic aspects of the environment, as well as the concerns of management personnel operating the reservoirs, the local population, reservoir users, and various government departments. 2 figs

  19. BC Hydro best practices : energy efficiency and integrated planning

    International Nuclear Information System (INIS)

    Henriques, D.

    2004-01-01

    The key elements to success in energy efficiency include integrated energy planning, a review of conservation potential, pursuing a target, risk sharing between all parties, and long term planning when making investments in demand side management (DSM). The barriers to cost effective energy efficiency investment were also outlined along with the scope of the conservation potential review which included 95 per cent of electricity end use applications in all market sectors including residential, commercial, institutional and industrial. BC Hydro's Power Smart program focuses on energy efficiency and load displacement to meet 35 per cent of the utility's forecasted growth by 2012. The sources of savings within each of the market sectors were identified. Key recommendations regarding energy efficiency and conservation were also presented with reference to financial incentives offered by BC Hydro to consumers to encourage a switch to more efficient lighting systems. 10 figs

  20. ENVIRONMENTAL TECHNOLOGY VERIFICATION: JOINT (NSF-EPA) VERIFICATION STATEMENT AND REPORT HYDRO COMPLIANCE MANAGEMENT, INC. HYDRO-KLEEN FILTRATION SYSTEM, 03/07/WQPC-SWP, SEPTEMBER 2003

    Science.gov (United States)

    Verification testing of the Hydro-Kleen(TM) Filtration System, a catch-basin filter designed to reduce hydrocarbon, sediment, and metals contamination from surface water flows, was conducted at NSF International in Ann Arbor, Michigan. A Hydro-Kleen(TM) system was fitted into a ...

  1. Pico hydro power for rural electrification in developing countries

    International Nuclear Information System (INIS)

    Maher, P.; Smith, N.P.A.; Williams, A.A.

    1998-01-01

    Pico hydro power is a renewable energy system which has the potential to provide millions of rural people world-wide with a cheap, sustainable source of electricity. The development of new, cost-reducing approaches, including local manufacture and implementation in developing countries, has increased the accessibility of this technology to large numbers of people. The new approaches are investigated and some of the present constraints to wider adoption of this technology are analysed. (Author)

  2. A study of hydro-elastic instabilities of a weir

    International Nuclear Information System (INIS)

    Lacroix, C.; Viollet, P.L.

    1987-01-01

    Following low-frequency oscillations which appeared during the initial isothermal tests of Super-Phenix, LNH developed a scale model together with an analytical model approach. The hydro-elastic model allowed to set the phenomena to evidence and quantify the depending parameters influence, while the analytical approach allowed to have a better understanding of the phenomena and of the main parameters dependence [fr

  3. A Statistic Analysis Of Romanian Seaside Hydro Tourism

    OpenAIRE

    Secara Mirela

    2011-01-01

    Tourism represents one of the ways of spending spare time for rest, recreation, treatment and entertainment, and the specific aspect of Constanta County economy is touristic and spa capitalization of Romanian seaside. In order to analyze hydro tourism on Romanian seaside we have used statistic indicators within tourism as well as statistic methods such as chronological series, interdependent statistic series, regression and statistic correlation. The major objective of this research is to rai...

  4. Hydro operational restrictions forum: Licensee workshop summary. Final report

    International Nuclear Information System (INIS)

    Ebrahim, S.; Monahan, C.K.; Pistor, B.; West, A.

    1998-08-01

    In spite of producing no atmospheric pollutants, hydroelectric power plants often go unrecognized as a unique provider of clean, efficient, low-cost energy. A concerted effort is needed to ensure that these attributes are fully accounted for when considering the uses and benefits of available water resources. Relicensing reviews and other regulatory activities associated with continued operation of hydro generation projects have drawn increased attention to hydro resources. This attention has typically resulted in imposition of conditions having a substantial cost impact without, necessarily, reflecting a full appreciation of the resource's benefits and attributes. With the extensive countrywide effort in relicensing and regulation, there is an opportunity to collect and compile lessons learned. This is particularly true with respect to preferred practices, technologies, and techniques applicable to required studies and mitigation measures. Such compilation will enable the industry and related stakeholders to improve quality and effectiveness while reducing costs of relicensing and mitigation for continued hydro operations. As a technology leader for the industry, EPRI is in a unique position to identify and document these techniques and practices. This report comprises the proceedings of the hydro licensees workshop. Fifteen licensee representatives with recent or current involvement in the relicensing process gathered at this workshop and shared their experiences, both good and bad. Support was strong among attendees for EPRI's effort to collect and compile these, along with the experiences of others, into a guidebook of accepted practices. Initial workshop findings were used in the second workshop to solicit buy-in from agencies and NGOs to the need for--as well as proposed scope of--a compendium of preferred practices

  5. Hydro-environmental factors and phytoplankton of the Atlantic ...

    African Journals Online (AJOL)

    Hydro-environmental factors and phytoplankton of the Atlantic Ocean, off the Light House Beach, Lagos, Nigeria. ... (28.37±1.88), pH (7.85±0.17), conductivity (44738.75±6262.76 μS/cm), total dissolved solids (29236.71±4273.30 mg/L), salinity (27.11±3.91 ‰), alkalinity (126.99±42.81 mg/L) and chloride (15056.

  6. Hydro-geophysical investigations for groundwater at Atan ...

    African Journals Online (AJOL)

    The depth to bedrock varies from 5.5 - 53.1m with resistivity values ranging between 61 -11,292 ohm-m. The hydro-geologic study focused on measurement of depth to water table and actual depth of the hand dug wells while the geological aspect of the work was hinged on a geologic mapping. The results of hydrogeologic ...

  7. Segmental dependent transport of low permeability compounds along the small intestine due to P-glycoprotein: the role of efflux transport in the oral absorption of BCS class III drugs.

    Science.gov (United States)

    Dahan, Arik; Amidon, Gordon L

    2009-01-01

    The purpose of this study was to investigate the role of P-gp efflux in the in vivo intestinal absorption process of BCS class III P-gp substrates, i.e. high-solubility low-permeability drugs. The in vivo permeability of two H (2)-antagonists, cimetidine and famotidine, was determined by the single-pass intestinal perfusion model in different regions of the rat small intestine, in the presence or absence of the P-gp inhibitor verapamil. The apical to basolateral (AP-BL) and the BL-AP transport of the compounds in the presence or absence of various efflux transporters inhibitors (verapamil, erythromycin, quinidine, MK-571 and fumitremorgin C) was investigated across Caco-2 cell monolayers. P-gp expression levels in the different intestinal segments were confirmed by immunoblotting. Cimetidine and famotidine exhibited segmental dependent permeability through the gut wall, with decreased P(eff) in the distal ileum in comparison to the proximal regions of the intestine. Coperfusion of verapamil with the drugs significantly increased the permeability in the ileum, while no significant change in the jejunal permeability was observed. Both drugs exhibited significantly greater BL-AP than AP-BL Caco-2 permeability, indicative of net mucosal secretion. Concentration dependent decrease of this secretion was obtained by the P-gp inhibitors verapamil, erythromycin and quinidine, while no effect was evident by the MRP2 inhibitor MK-571 and the BCRP inhibitor FTC, indicating that P-gp is the transporter mediates the intestinal efflux of cimetidine and famotidine. P-gp levels throughout the intestine were inversely related to the in vivo permeability of the drugs from the different segments. The data demonstrate that for these high-solubility low-permeability P-gp substrates, P-gp limits in vivo intestinal absorption in the distal segments of the small intestine; however P-gp plays a minimal role in the proximal intestinal segments due to significant lower P-gp expression levels

  8. First-In-Class Small Molecule ONC201 Induces DR5 and Cell Death in Tumor but Not Normal Cells to Provide a Wide Therapeutic Index as an Anti-Cancer Agent.

    Science.gov (United States)

    Allen, Joshua E; Crowder, Roslyn N; Crowder, Roslyn; El-Deiry, Wafik S

    2015-01-01

    We previously identified ONC201 (TIC10) as a first-in-class orally active small molecule with robust antitumor activity that is currently in clinical trials in advanced cancers. Here, we further investigate the safety characteristics of ONC201 in preclinical models that reveal an excellent safety profile at doses that exceed efficacious doses by 10-fold. In vitro studies indicated a strikingly different dose-response relationship when comparing tumor and normal cells where maximal effects are much stronger in tumor cells than in normal cells. In further support of a wide therapeutic index, investigation of tumor and normal cell responses under identical conditions demonstrated large apoptotic effects in tumor cells and modest anti-proliferative effects in normal cells that were non-apoptotic and reversible. Probing the underlying mechanism of apoptosis indicated that ONC201 does not induce DR5 in normal cells under conditions that induce DR5 in tumor cells; DR5 is a pro-apoptotic TRAIL receptor previously linked to the anti-tumor mechanism of ONC201. GLP toxicology studies in Sprague-Dawley rats and beagle dogs at therapeutic and exaggerated doses revealed no dose-limiting toxicities. Observations in both species at the highest doses were mild and reversible at doses above 10-fold the expected therapeutic dose. The no observed adverse event level (NOAEL) was ≥42 mg/kg in dogs and ≥125 mg/kg in rats, which both correspond to a human dose of approximately 1.25 g assuming standard allometric scaling. These results provided the rationale for the 125 mg starting dose in dose escalation clinical trials that began in 2015 in patients with advanced cancer.

  9. First-In-Class Small Molecule ONC201 Induces DR5 and Cell Death in Tumor but Not Normal Cells to Provide a Wide Therapeutic Index as an Anti-Cancer Agent.

    Directory of Open Access Journals (Sweden)

    Joshua E Allen

    Full Text Available We previously identified ONC201 (TIC10 as a first-in-class orally active small molecule with robust antitumor activity that is currently in clinical trials in advanced cancers. Here, we further investigate the safety characteristics of ONC201 in preclinical models that reveal an excellent safety profile at doses that exceed efficacious doses by 10-fold. In vitro studies indicated a strikingly different dose-response relationship when comparing tumor and normal cells where maximal effects are much stronger in tumor cells than in normal cells. In further support of a wide therapeutic index, investigation of tumor and normal cell responses under identical conditions demonstrated large apoptotic effects in tumor cells and modest anti-proliferative effects in normal cells that were non-apoptotic and reversible. Probing the underlying mechanism of apoptosis indicated that ONC201 does not induce DR5 in normal cells under conditions that induce DR5 in tumor cells; DR5 is a pro-apoptotic TRAIL receptor previously linked to the anti-tumor mechanism of ONC201. GLP toxicology studies in Sprague-Dawley rats and beagle dogs at therapeutic and exaggerated doses revealed no dose-limiting toxicities. Observations in both species at the highest doses were mild and reversible at doses above 10-fold the expected therapeutic dose. The no observed adverse event level (NOAEL was ≥42 mg/kg in dogs and ≥125 mg/kg in rats, which both correspond to a human dose of approximately 1.25 g assuming standard allometric scaling. These results provided the rationale for the 125 mg starting dose in dose escalation clinical trials that began in 2015 in patients with advanced cancer.

  10. A modified gravitational search algorithm based on a non-dominated sorting genetic approach for hydro-thermal-wind economic emission dispatching

    International Nuclear Information System (INIS)

    Chen, Fang; Zhou, Jianzhong; Wang, Chao; Li, Chunlong; Lu, Peng

    2017-01-01

    Wind power is a type of clean and renewable energy, and reasonable utilization of wind power is beneficial to environmental protection and economic development. Therefore, a short-term hydro-thermal-wind economic emission dispatching (SHTW-EED) problem is presented in this paper. The proposed problem aims to distribute the load among hydro, thermal and wind power units to simultaneously minimize economic cost and pollutant emission. To solve the SHTW-EED problem with complex constraints, a modified gravitational search algorithm based on the non-dominated sorting genetic algorithm-III (MGSA-NSGA-III) is proposed. In the proposed MGSA-NSGA-III, a non-dominated sorting approach, reference-point based selection mechanism and chaotic mutation strategy are applied to improve the evolutionary process of the original gravitational search algorithm (GSA) and maintain the distribution diversity of Pareto optimal solutions. Moreover, a parallel computing strategy is introduced to improve the computational efficiency. Finally, the proposed MGSA-NSGA-III is applied to a typical hydro-thermal-wind system to verify its feasibility and effectiveness. The simulation results indicate that the proposed algorithm can obtain low economic cost and small pollutant emission when dealing with the SHTW-EED problem. - Highlights: • A hybrid algorithm is proposed to handle hydro-thermal-wind power dispatching. • Several improvement strategies are applied to the algorithm. • A parallel computing strategy is applied to improve computational efficiency. • Two cases are analyzed to verify the efficiency of the optimize mode.

  11. BC Hydro experiences the power of engineering document management software

    International Nuclear Information System (INIS)

    Wilkins, A.

    2000-01-01

    The recent popularity of electronic document management software (EDMS), specifically designed for engineering CAD/CAM drawings that holds the promise of reducing paper-pushing and freeing up organizational resources for more productive purposes, is discussed. To illustrate how such systems function, a document management system installed at BC Hydro, with over 2,500 users in two main engineering groups is described. The new system - FileNET - replaces several older systems that have been used as stand-alone systems in various divisions of BC Hydro for some time. Instead of integrating the entire file of some 750,000 documents, the new system has complete records of some 70,000 of the most recent CAD drawings and an on-line index to the older file that is used less frequently. Access to the entire storehouse of drawings is said to be fast, efficient and secure. Automated document control procedures during work-in-progress, viewing, redlining capabilities, seamless integration with CAD tools and Web access to drawings from anywhere within the two engineering divisions, are some of the most noteworthy characteristics of the new system. It does not completely replace paper, but it does promise significant streamlining of the paper handling function. It also ensures that BC Hydro's central computer is the prime repository of all documents and drawings, and that this valuable record of environmental. legal, regulatory and other public policy importance is instantly available, without the need to handle paper

  12. Hydro-Thermal Fatigue Resistance Measurements on Polymer Interfaces

    Science.gov (United States)

    Gurumurthy, Charan K.; Kramer, Edward J.; Hui, Chung-Yuen

    1998-03-01

    We have developed a new technique based on a fiber optic displacement sensor for rapid determination of hydro-thermal fatigue crack growth rate per cycle (da/dN) of an epoxy/polyimide interface used in flip chip attach microelectronic assembly. The sample is prepared as a trilayered cantilever beam by capillary flow of the epoxy underfill over a polyimide coated metallic beam. During hydro-thermal cycling the crack growth along the interface (from the free end) changes the displacement of this end of the beam and we measure the free end displacement at the lowest temperature in each hydro-thermal cycle. The change in beam displacement is then converted into crack growth rate (da/dN). da/dN depends on the maximum change in the strain energy release rate of the crack and the phase angle in each cycle. The relation between da/dN and maximum strain energy release rate characterizes the fatigue crack growth resistance of the interface. We have developed and used a simple model anhydride cured and a commercially available PMDA/ODA passivation for this study.

  13. Proposed Hydro-Quebec development plan, 1993: Proposal

    International Nuclear Information System (INIS)

    1992-01-01

    The Quebec government now requires Hydro-Quebec to submit a development plan every three years instead of annually, in order to permit more in-depth studies and a broader consultation with interested parties. In the first of such three-year plans, a series of plan proposals is presented which was developed after a year of consultation with various groups on four fundamental matters: energy efficiency, means of generation, electro-intensive industries, and electricity exports. Options for meeting future demand at Hydro-Quebec are assessed, including the construction of new generation and transmission facilities, rehabilitation of existing facilities, improving electrical energy efficiency, and conservation strategies. These options are considered while applying the principle of sustainable development that respects the environment. Hydroelectricity will continue to be emphasized as the main source of generation since hydroelectric facilities offer distinct advantages in terms of costs, environmental impacts, and economic spinoffs. The proposed plan also presents objectives and strategies for improving the quality of service and internal operations. Financial forecasts for Hydro-Quebec are proposed which take into account the forecast changes in the utility's cost and revenue factors and its self-financing requirements. 5 figs., 15 tabs

  14. Defense plan of Hydro-Quebec for extreme contingencies

    International Nuclear Information System (INIS)

    Trudel, Guilles; Bernard, Serge; Portales, Esteban

    2000-01-01

    In the last years, Hydro-Quebec it undertook an important program to improve the dependability of their net of energy transport. They concentrated the efforts on increasing the capacity of the net resist in the event of carries to an extreme contingency caused in general by multiple incidents or for successive disconnection of the lines of energy transport. To neutralize these contingencies, Hydro-Quebec it adopted a series of special measures that are contained under the general title of Plan of Defense for Extreme Contingencies. The objective of this plan is to detect the incidents that surpass the capacity of the net. It is completely automatic and it is based mainly in: A system of automatic disconnection of generation and tele-shot of loads; A system of automatic maneuver (opening and closing) of inductances shunt of 735 kw; A system of disconnection of loads for low voltage; A system of disconnection of loads for low frequency. The present document summarizes the orientations that there is taking Hydro-Quebec to protect its net in the event of extreme contingencies and it describes the different automatism that they are adopts, in particular the system automatic disconnection of generation and tele-shot of loads (RPTC) that is one of the main components of the defense plan. The system RPTC detects the simultaneous loss of several lines directly in 15 substations of 735 kw. It understands four places of automatic disconnection of generation and a centralized system of tele-shot of loads

  15. Implications of the Bangor Hydro decision on FERC relicensings

    Science.gov (United States)

    Pizzi, L.

    1997-01-01

    In the next 15 years, over 400 existing nonfederal dams will require new licenses by the Federal Energy Regulatory Commission (FERC) in order to continue operations. In many cases, state or federal agencies have a unique opportunity to condition the hydropower licenses to protect environmental values. In 1996, the Court of Appeals for the District of Columbia Circuit issued an opinion striking down a mandatory license condition imposed by the U.S. Department of the Interior in a FERC relicensing. The case, Bangor Hydro-Electric Company v.Federal Energy Regulatory Commission, is instructive for agencies regarding the procedures to be followed in imposing mandatory FERC licensing conditions in the future. After Bangor Hydro, agencies should: (1) support their decisions by substantial evidence in the FERC record, (2) request applicant studies to support agency decisions and allow public comment on the decisions as a means to test the facts and analysis, and (3) consider intervening in a case to defend the condition on appeal. Bangor Hydro also raises, but does not decide, the issue of whether the agency imposing the mandatory condition should engage in balancing the economics of the hydropower project with the public resources affected by the project.

  16. Assessing the role of large hydro in Canada's electricity future

    International Nuclear Information System (INIS)

    Lee Pochih

    1992-01-01

    Electric power in Canada was first generated by steam in the 1880s. The use of hydroelectricity spread rapidly due to abundant water resources and the nationalization of power companies by the provinces; by 1920, 97% of Canadian electricity production came from hydroelectric plants. Thermal generation became competitive by the 1960s, when most of the best hydro sites had been developed, and nuclear generation also started gaining a share of the market. By 1991, hydroelectricity's share of Canadian power production had declined to around 60%. Hydroelectric power has long been used as an instrument of Canadian industrial policy. Given the amount and importance of utility capital expenditures, it was recognized that hydropower development could serve such policy objectives as job creation, industrial development, and macroeconomic stabilization. Creation of provincially owned utilities led to construction of large hydroelectric projects, notably in Quebec, British Columbia, Manitoba, and Newfoundland. The 20 largest hydroelectric power plants in Canada have a total installed capacity of 35,704 MW, representing ca 59% of Canada's total 1991 hydro capacity. The construction of such large projects is not expected to proceed as quickly as in the past because of environmental concerns. However, a number of factors favor continuation of development of hydro resources: a remaining potential estimated at ca 44,000 MW; simplification of electricity export regulations; more stringent air pollution standards that favor non-polluting energy sources; and a moratorium on nuclear power plants in Ontario. 4 tabs

  17. In the spotlight: New hydro development in North America

    International Nuclear Information System (INIS)

    Barnes, M.J.

    1993-01-01

    1992 was a year of progress for many segments of the hydropower industry as developers worked to bring new projects on line. This industry overview features several of these projects and offers a preview of 1993 activity. The only operating privately owned hydroelectric project in Texas. The largest hydro plant in the province of Manitoba. The world's largest submersible hydroturbine-generator. These projects and others-completed and placed in service in 1992-can claim a special place in the history books. For each of the 31 hydro projects in North America that began operating in 1992, there's a unique story to tell. Each called upon the time, talent, commitment, ingenuity, and perseverance of those involved in their development. In aggregate, these projects contribute nearly 3,800 MW of clean, renewable electrical capacity that can be used efficiently and cost-effectively to help meet the power demands of customers in the US and Canada. Utilities, state agencies, municipalities, and independent power developers played roles in developing new hydro in 1992. We offer a sampling of their work to illustrate progress made in the past year

  18. Large scale hydro-economic modelling for policy support

    Science.gov (United States)

    de Roo, Ad; Burek, Peter; Bouraoui, Faycal; Reynaud, Arnaud; Udias, Angel; Pistocchi, Alberto; Lanzanova, Denis; Trichakis, Ioannis; Beck, Hylke; Bernhard, Jeroen

    2014-05-01

    To support European Union water policy making and policy monitoring, a hydro-economic modelling environment has been developed to assess optimum combinations of water retention measures, water savings measures, and nutrient reduction measures for continental Europe. This modelling environment consists of linking the agricultural CAPRI model, the LUMP land use model, the LISFLOOD water quantity model, the EPIC water quality model, the LISQUAL combined water quantity, quality and hydro-economic model, and a multi-criteria optimisation routine. With this modelling environment, river basin scale simulations are carried out to assess the effects of water-retention measures, water-saving measures, and nutrient-reduction measures on several hydro-chemical indicators, such as the Water Exploitation Index (WEI), Nitrate and Phosphate concentrations in rivers, the 50-year return period river discharge as an indicator for flooding, and economic losses due to water scarcity for the agricultural sector, the manufacturing-industry sector, the energy-production sector and the domestic sector, as well as the economic loss due to flood damage. Recently, this model environment is being extended with a groundwater model to evaluate the effects of measures on the average groundwater table and available resources. Also, water allocation rules are addressed, while having environmental flow included as a minimum requirement for the environment. Economic functions are currently being updated as well. Recent development and examples will be shown and discussed, as well as open challenges.

  19. Enhancement of the Haemmerli hydro power installation in Lenzburg, Switzerland; Gemeinde Lenzburg (AG). Ausbau Kraftwerk Haemmerli - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-08-15

    This preliminary report for the Swiss Federal Office of Energy (SFOE) presents a project on the refurbishment of an old industrial small hydro installation on the Aabach stream in Lenzburg, Switzerland. The state of the existing installation is described as is the station's concession. The proposals for the renewal of this installation are described and discussed. The necessary building work and the installations required are examined. Investment costs, operating and maintenance costs and expected profitability are discussed. The report is completed with suggestions for further work.

  20. Application by Manitoba Hydro for an order approving an increase in its existing rates effective April 1, 1992

    International Nuclear Information System (INIS)

    1992-01-01

    In accordance with an order from the Manitoba Public Utilities Board, Manitoba Hydro's proposed schedule of rates effective April 1, 1992 is presented along with a revenue forecast. The rate schedule is divided into the following categories: residential rates, flat-rate water heating rates, small general service customers (not exceeding 200 kVA), large general service, general service cooking and heating rates, general service flat-rate water heating, and area and roadway lighting. Comparisons are made for all rate categories between present utility bills and bills under the proposed new rates. 10 tabs