WorldWideScience

Sample records for sluices

  1. Antecedent Selection for Sluicing

    DEFF Research Database (Denmark)

    Anand, Pranav; Hardt, Daniel

    2016-01-01

    Sluicing is an elliptical process where the majority of a question can go unpronounced as long as there is a salient antecedent in previous discourse. This paper considers the task of antecedent selection: finding the correct antecedent for a given case of sluicing. We argue that both syntactic...... and discourse relationships are important in antecedent selection, and we construct linguistically sophisticated features that describe the relevant relationships. We also define features that describe the relation of the content of the antecedent and the sluice type. We develop a linear model which achieves...... accuracy of 72.4%, a substantial improvement over a strong manually constructed baseline. Feature analysis confirms that both syntactic and discourse features are important in antecedent selection....

  2. Classifying Sluice Occurrences in Dialogue

    DEFF Research Database (Denmark)

    Baird, Austin; Hamza, Anissa; Hardt, Daniel

    2018-01-01

    perform manual annotation with acceptable inter-coder agreement. We build classifier models with Decision Trees and Naive Bayes, with accuracy of 67%. We deploy a classifier to automatically classify sluice occurrences in OpenSubtitles, resulting in a corpus with 1.7 million occurrences. This will support....... Despite this, the corpus can be of great use in research on sluicing and development of systems, and we are making the corpus freely available on request. Furthermore, we are in the process of improving the accuracy of sluice identification and annotation for the purpose of created a subsequent version...

  3. Development of a Self-Sluicing Pressure Leaf Filter

    Science.gov (United States)

    Cousineau, Bernard L.; Lumsden, J. R.

    The cylindrical Kelly filter presses installed in the Ewarton Works "C" phase did not perform satisfactorily because of difficulties with head seals, locking rings, and shell retraction mechanisms. As rectification required major modifications, a concept of a press which did not require to be opened for sluicing was proposed. Test work of various sluicing and res lurrying spray arrangements was carried out, and this led to the design of a self-sluicing press which used the shell of an existing Kelly press with its main axis vertical. One press was converted by July 1972, and a development period started. Although initial operation was encouraging, effective sluicing could not be guaranteed after 30 shifts. Modifications to leaf spacing, spray rotational speed, spray slot width, feed pressure and pre-coat control by November 1973, however, allowed effective performance for all of the 800 hour canvas life. Advantages are: reduced operating and maintenance manpower, clean environment, and reduced maintenance cost. The use of 1st wash overflow for sluicing has reduced caustic soda and canvas consumption. Ewarton Works now has four converted self-sluicing presses, and arc converting five more, and Arvida Works plan the installation of one for tests on red pressing (blow-off filtration). A side benefit of the development was the study of the benefits of constant pressure overflow filtration.

  4. The gelsluice, an innovative idea for the present sluice structures

    Directory of Open Access Journals (Sweden)

    de Gijt Jacob Gerrit (Jarit

    2017-01-01

    Full Text Available Sluices have been built worldwide since in 984 when the first sluice was built in China to speed up the operations in the Grand canal. Since that time different types of sluices have been developed world wide both in size and material use and their own shipping and structural characteristics. One of the main drawbacks of the present sluice designs is the waiting time. This problem of the waiting time is in principle overcome by the design of the gelsluice (gellock. This paper describe the development of sluices construction in general and with the emphasis on the characteristics of the innovative gelsluice. A preliminary design of the gelsluice will be discussed and presented. Finally some recommendations are presented for further research to improve the design of the gelsluice.

  5. Descriptive models for single-jet sluicing of sludge waste

    International Nuclear Information System (INIS)

    Erian, F.F.; Mahoney, L.A.; Terrones, G.

    1997-12-01

    Mobilization of sludge waste stored in underground storage tanks can be achieved safely and reliably by sluicing. In the project discussed in this report, the waste in Hanford single-shell Tank 241-C-106 will be mobilized by sluicing, retrieved by a slurry retrieval pump, and transferred via an 1800-ft slurry pipeline to Tank 241-AY-102. A sluicing strategy must be developed that ensures efficient use of the deployed configuration of the sluicing system: the nozzle(s) and the retrieval pump(s). Given a sluicing system configuration in a particular tank, it is desirable to prescribe the sequential locations at which the sludge will be mobilized and retrieved and the rate at which these mobilization and retrieval processes take place. In addition, it is necessary to know whether the retrieved waste slurry meets the requirements for cross-site slurry transport. Some of the physical phenomena that take place during mobilization and retrieval and certain aspects of the sluicing process are described in this report. First, a mathematical model gives (1) an idealized geometrical representation of where, within the confines of a storage tank containing a certain amount of settled waste, sludge can be removed and mobilized; and (2) a quantitative measure of the amount of sludge that can be removed during a sluicing campaign. A model describing an idealized water jet issuing from a circular nozzle located at a given height above a flat surface is also presented in this report. This dynamic water-jet model provides the basis for improving the geometrical sluicing model presented next. In this model the authors assume that the water jet follows a straight trajectory toward a target point on a flat surface. However, the water jet does not follow a straight line in the actual tank, and using the true trajectory will allow a more accurate estimate of the amount of disturbed material. Also, the authors hope that developing accurate force and pressure fields will lead to a better

  6. Aerosol characteristics in the offgas from a pilot-scale sluicing operation

    International Nuclear Information System (INIS)

    Ligotke, M.W.; Whyatt, G.A.; Beckette, M.R.

    1995-01-01

    A pilot-scale study was performed to simulate conditions anticipated during sluicing operations to retrieve waste in single-shell Tank 241-C-106 at the US Department of Energy's Hanford Site in southeastern Washington. The objective of the study was to identify and characterize the potential aerosol source term at the inlet of the headspace exhaust ventilation system during sluicing operations. The information is needed to support decisions for components to be used in the full-scale operation. A secondary objective was to qualitatively evaluate the visibility during sluicing. Three simulated sluicing tests were performed in the 336 Building's quarter-scale waste tank facility located at Hanford. Scaling relationships were used to guide modifications to the quarter-scale tank to accommodate tests that simulated tank geometry, sluicing, and ventilation conditions in the full-scale tank. Simulated sluicing fluids were targeted on solid and liquid surfaces during the tests. Test conditions were monitored, and aerosol measurements were made in the offgas ventilation duct. Also during the tests, an in-tank camera was used to monitor visibility

  7. Aerosol characteristics in the offgas from a pilot-scale sluicing operation

    Energy Technology Data Exchange (ETDEWEB)

    Ligotke, M.W.; Whyatt, G.A.; Beckette, M.R.

    1995-01-01

    A pilot-scale study was performed to simulate conditions anticipated during sluicing operations to retrieve waste in single-shell Tank 241-C-106 at the US Department of Energy`s Hanford Site in southeastern Washington. The objective of the study was to identify and characterize the potential aerosol source term at the inlet of the headspace exhaust ventilation system during sluicing operations. The information is needed to support decisions for components to be used in the full-scale operation. A secondary objective was to qualitatively evaluate the visibility during sluicing. Three simulated sluicing tests were performed in the 336 Building`s quarter-scale waste tank facility located at Hanford. Scaling relationships were used to guide modifications to the quarter-scale tank to accommodate tests that simulated tank geometry, sluicing, and ventilation conditions in the full-scale tank. Simulated sluicing fluids were targeted on solid and liquid surfaces during the tests. Test conditions were monitored, and aerosol measurements were made in the offgas ventilation duct. Also during the tests, an in-tank camera was used to monitor visibility.

  8. Waste retrieval sluicing system campaign number 1 solids volume transferred calculation

    International Nuclear Information System (INIS)

    BAILEY, J.W.

    1999-01-01

    This calculation has been prepared to document the volume of sludge removed from tank 241-C-106 during Waste Retrieval Sluicing System (WRSS) Sluicing Campaign No.1. This calculation will be updated, if necessary, to incorporate new data. This calculation supports the declaration of completion of WRSS Campaign No.1 and, as such, is also the documentation for completion of Performance Agreement TWR 1.2.1 , C-106 Sluicing Performance Expectations. It documents the performance of all the appropriate tank 241-C-106 mass transfer verifications, evaluations, and appropriate adjustments discussed in HNF-SD-WM-PROC-021, Chapter 23, ''Process Engineering Calculations for Tank 241-C-106 Sluicing and Retrieval''

  9. Waste retrieval sluicing system campaign number 1 solids volume transferred calculation

    International Nuclear Information System (INIS)

    BAILEY, J.W.

    1999-01-01

    This calculation has been prepared to document the volume of sludge removed from tank 241-C-106 during Waste Retrieval Sluicing System (WRSS) Sluicing Campaign No.1. This calculation will be updated, if necessary, to incorporate new data. This calculation supports the declaration of completion of WRSS Campaign No.1 and, as such, is also the documentation for completion of Performance Agreement TWR 1.2.1 C-106 Sluicing Performance Expectations. It documents the performance of all the appropriate tank 241-C-106 mass transfer verifications, evaluations, and appropriate adjustments discussed in HNF-SD-WM-PROC-021, Chapter 23, ''Process Engineering Calculations for Tank 241-C-106 Sluicing and Retrieval''

  10. PERBANDINGAN EFEKTIFITAS HASIL PENGGELONTORAN SEDIMEN DI WADUK CARA FLUSHING DAN SLUICING

    Directory of Open Access Journals (Sweden)

    Pranoto S. Atmodjo

    2013-10-01

    Full Text Available This study compares the effectiveness of the flushing of sediment in the reservoir by means of flushing andSluicing way, based on Physical Hydraulic Test (Model Test in the laboratory. Flushing is removingaccumulated deposited sediment. While slucing is releasing of sediment through the reservoir beforesettled or keep sediment remain in suspension and its occur during flood period. Sediments FlushEffectiveness represented by the percentage of released sediment by sediment deposited or the amount ofsediment entering the reservoir during the flushing period.The model based on the prototipe from DetailDesign of Structural Countermeasures for Sedimentation on Wonogiri Reservoir by Nippon Koei 2009.Running model duration is one hour, used free flow and submergence condition, with discharge variationQ=100, 200 and 400 m3/s. Sluicing experiments conducted with some 60 liters of sediment sprinkle evenlywide flow, and Flushing implemented by 2,00 m thickness of deposited sediment that spreaded over thereservoir bottom before running. From this research showed that Sluicing way more efficient than theflushing way, where the number of efficiency of sediment Sluicing way bigger than the efficiency offlusing way, in the running an hour in the laboratory test

  11. Experimental investigation on the relationship between sluice caisson shape of tidal power plant and the water discharge capability

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dal Soo; Oh, Sang-Ho; Yi, Jin-Hak; Park, Woo-Sun [Coastal Engineering and Ocean Energy Research Department, Korea Ocean Research and Development Institute, Ansan 426-744 (Korea); Cho, Hyu-Sang; Kim, Duk-Gu; Ahn, Suk-Jin [Technology Research and Development Institute, Hyein E and C Co. Ltd., Seoul 157-861 (Korea); Eom, Hyun-Min [Global Environment System Research Laboratory, National Institute of Meteorological Research/KMA, Seoul 156-720 (Korea)

    2010-10-15

    The change of water discharge capability of the sluice caisson of tidal power plant according to the change of geometrical shape of the sluice caisson was investigated by performing laboratory experiments. The major design parameters that constitute general shape of the sluice caisson were deduced and a total of 32 different shapes of sluice caisson models were subjected to the hydraulic experiments. For every sluice caisson model, the water discharge capability was estimated with five different flow rates and three different water level conditions. The experiments were carried out in an open channel flume with a great care to measure flow rate and water level accurately, which are key physical quantities in estimating the water discharge capability of the sluice caisson models. By analyzing the experimental results, influence of the respective design parameters on the performance of the sluice caisson was examined and the general guidelines to enhance the water discharge capability were suggested. The discharge coefficient of the best sluice caisson model ranged from 2.3 to 3.1 depending on the experimental conditions, which is far higher than the values that were adopted in the past feasibility studies in Korea. (author)

  12. Study on ecological regulation of coastal plain sluice

    Science.gov (United States)

    Yu, Wengong; Geng, Bing; Yu, Huanfei; Yu, Hongbo

    2018-02-01

    Coastal plains are densely populated and economically developed, therefore their importance is self-evident. However, there are some problems related with water in coastal plains, such as low flood control capacity and severe water pollution. Due to complicated river network hydrodynamic force, changeable flow direction and uncertain flood concentration and propagation mechanism, it is rather difficult to use sluice scheduling to realize flood control and tackle water pollution. On the base of the measured hydrological data during once-in-a-century Fitow typhoon in 2013 in Yuyao city, by typical analysis, theoretical analysis and process simulation, some key technologies were researched systematically including plain river network sluice ecological scheduling, “one tide” flood control and drainage scheduling and ecological running water scheduling. In the end, single factor health diagnostic evaluation, unit hydrograph of plain water level and evening tide scheduling were put forward.

  13. Tank 241-C-106 waste retrieval sluicing system process control plan

    Energy Technology Data Exchange (ETDEWEB)

    Carothers, K.G.

    1998-07-25

    Project W-320 has installed the Waste Retrieval Sluicing System at the 200 East Area on the Hanford Site to retrieve the sludge from single-shell tank 241-C-106 and transfer it into double-shell tank 241-AY-102. Operation of the WRSS process will resolve the high-heat safety issue for tank 241-C-106 and demonstrate a technology for the retrieval of single-shell tank wastes. This process control plan coordinates the technical operating requirements (primarily mass transfer, temperature, and flammable gas) for the sluicing operation and provides overall technical guidance for the retrieval activity.

  14. Tank 241-C-106 waste retrieval sluicing system process control plan

    International Nuclear Information System (INIS)

    Carothers, K.G.

    1998-01-01

    Project W-320 has installed the Waste Retrieval Sluicing System at the 200 East Area on the Hanford Site to retrieve the sludge from single-shell tank 241-C-106 and transfer it into double-shell tank 241-AY-102. Operation of the WRSS process will resolve the high-heat safety issue for tank 241-C-106 and demonstrate a technology for the retrieval of single-shell tank wastes. This process control plan coordinates the technical operating requirements (primarily mass transfer, temperature, and flammable gas) for the sluicing operation and provides overall technical guidance for the retrieval activity

  15. W-320 waste retrieval sluicing system transfer line flushing volume and frequency calculation

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1997-01-01

    The calculations contained in this analysis document establish the technical basis for the volume, frequency, and flushing fluid to be utilized for routine Waste Retrieval Sluicing System (WRSS) process line flushes. The WRSS was installed by Project W-320, Tank 241-C-106 Sluicing. The double contained pipelines being flushed have 4 inch stainless steel primary pipes. The flushes are intended to prevent hydrogen buildup in the transfer lines and to provide ALARA conditions for maintenance personnel

  16. Waste Retrieval Sluicing System Campaign Number 3 Solids Volume Transferred Calculation

    International Nuclear Information System (INIS)

    CAROTHERS, K.G.

    1999-01-01

    Waste Retrieval Sluicing System (WRSS) operations at tank 241-C-106 began on Wednesday, November 18, 1998. The purpose of this system is to retrieve and transfer the high-heat sludge from the tank for storage in double-shell tank 241-AY-102, thereby resolving the high-heat safety issue for the tank, and to demonstrate modernized past-practice retrieval technology for single-shell tank waste. Performance Agreement (PA) TWR 1.2.2, C-106 Sluicing, was established by the Department of Energy, Office of River Protection (ORP) for achieving completion of sluicing retrieval of waste from tank 241-C-106 by September 30, 1999. This level of sludge removal is defined in the PA as either removal of approximately 72 inches of sludge or removal of 172,000 gallons of sludge (approximately 62 inches) and less than 6,000 gallons (approximately 2 inches) of sludge removal per 12 hour sluice batch for three consecutive batches. Preliminary calculations of the volume of tank 241-C-106 sludge removed as of September 29, 1999 were provided to ORP documenting completion of PA TWR 1.2.2 (Allen 1999a). The purpose of this calculation is to document the final sludge volume removed from tank 241-C-106 up through September 30, 1999. Additionally, the results of an extra batch completed October 6, 1999 is included to show the total volume of sludge removed through the end of WRSS operations. The calculation of the sludge volume transferred from the tank is guided by engineering procedure HNF-SD-WM-PROC-021, Section 15.0,Rev. 3, sub-section 4.4, ''Calculation of Sludge Transferred.''

  17. Waste Retrieval Sluicing System Campaign Number 3 Solids Volume Transferred Calculation

    International Nuclear Information System (INIS)

    CAROTHERS, K.G.

    1999-01-01

    Waste Retrieval Sluicing System (WRSS) operations at tank 241-C-106 began on Wednesday, November 18,1998. The purpose of this system is to retrieve and transfer the high-heat sludge from the tank for storage in double-shell tank 241-AY-102, thereby resolving the high-heat safety issue for the tank, and to demonstrate modernized past-practice retrieval technology for single-shell tank waste. Performance Agreement (PA) TWR 1.2.2, C-106 Sluicing, was established by the Department of Energy, Office of River Protection (ORP) for achieving completion of sluicing retrieval of waste from tank 241-C-106 by September 30,1999. This level of sludge removal is defined in the PA as either removal of approximately 72 inches of sludge or removal of 172,000 gallons of sludge (approximately 62 inches) and less than 6,000 gallons (approximately 2 inches) of sludge removal per 12 hour sluice batch for three consecutive batches. Preliminary calculations of the volume of tank 241-C-106 sludge removed as of September 29, 1999 were provided to ORP documenting completion of PA TWR 1.2.2 (Allen 1999a). The purpose of this calculation is to document the final sludge volume removed from tank 241-C-106 up through September 30, 1999. Additionally, the results of an extra batch completed October 6, 1999 is included to show the total volume of sludge removed through the end of WRSS operations. The calculation of the sludge volume transferred from the tank is guided by engineering procedure HNF-SD-WM-PROC-021, Section 15.0,Rev. 3, sub-section 4.4, ''Calculation of Sludge Transferred.''

  18. The Real-Time Processing of Sluiced Sentences

    Science.gov (United States)

    Poirier, Josee; Wolfinger, Katie; Spellman, Lisa; Shapiro, Lewis P.

    2010-01-01

    Ellipsis refers to an element that is absent from the input but whose meaning can nonetheless be recovered from context. In this cross-modal priming study, we examined the online processing of Sluicing, an ellipsis whose antecedent is an entire clause: "The handyman threw a book to the programmer but I don't know which book" the handyman threw to…

  19. Identification of key factors affecting the water pollutant concentration in the sluice-controlled river reaches of the Shaying River in China via statistical analysis methods.

    Science.gov (United States)

    Dou, Ming; Zhang, Yan; Zuo, Qiting; Mi, Qingbin

    2015-08-01

    The construction of sluices creates a strong disturbance in water environmental factors within a river. The change in water pollutant concentrations of sluice-controlled river reaches (SCRRs) is more complex than that of natural river segments. To determine the key factors affecting water pollutant concentration changes in SCRRs, river reaches near the Huaidian Sluice in the Shaying River of China were selected as a case study, and water quality monitoring experiments based on different regulating modes were implemented in 2009 and 2010. To identify the key factors affecting the change rates for the chemical oxygen demand of permanganate (CODMn) and ammonia nitrogen (NH3-N) concentrations in the SCRRs of the Huaidian Sluice, partial correlation analysis, principal component analysis and principal factor analysis were used. The results indicate four factors, i.e., the inflow quantity from upper reaches, opening size of sluice gates, water pollutant concentration from upper reaches, and turbidity before the sluice, which are the common key factors for the CODMn and NH3-N concentration change rates. Moreover, the dissolved oxygen before a sluice is a key factor for the permanganate concentration from CODMn change rate, and the water depth before a sluice is a key factor for the NH3-N concentration change rate. Multiple linear regressions between the water pollutant concentration change rate and key factors were established via multiple linear regression analyses, and the quantitative relationship between the CODMn and NH3-N concentration change rates and key affecting factors was analyzed. Finally, the mechanism of action for the key factors affecting the water pollutant concentration changes was analyzed. The results reveal that the inflow quantity from upper reaches, opening size of sluice gates, permanganate concentration from CODMn from upper reaches and dissolved oxygen before the sluice have a negative influence and the turbidity before the sluice has a positive

  20. Hydraulic performance of sluice gate with unloaded upstream rotor ...

    African Journals Online (AJOL)

    ... compared to the flow under rotor and weir flow conditions. The video analysis also indicated that significant perturbation exists for the rotor angular speed. The normalized perturbation intensity varied from a minimum of 8% to a maximum of 60%. Keywords: sluice gate, rotor, angular speed, video analysis, hydropower ...

  1. Quantitative relations between chemical oxygen demand concentration and its influence factors in the sluice-controlled river reaches of Shaying River, China.

    Science.gov (United States)

    Dou, Ming; Li, Guiqiu; Li, Congying

    2015-01-01

    Recent research on the effects of dam and sluice construction on the water environment has attracted extensive attention from academia and governments alike. Because the operation of sluices greatly alters environmental factors such as water flow and sediment load, the water quality in sluice-controlled river reaches (SCRRs) undergoes complex changes compared with those in normal reaches. This work used river reaches near the Huaidian Sluice in Shaying River of China as a case study to analyse the effects of sluice operation on water quality evolution in SCRRs. The most influential factors affecting the rate of change in chemical oxygen demand (COD) concentration in SCRRs were identified through water quality monitoring experiments performed under various modes of sluice operation and by applying a statistical method 'partial correlation analysis'. Then, a hydrodynamic model incorporating sluice operation and a water quality transport and transform model incorporating the release of endogenous loads were developed. Using these two models, the processes of temporal and spatial change of COD concentrations in the SCRRs were simulated under various scenarios designed to represent the dominant factors of influence. Finally, the simulation results were used to develop empirical relationships between the rate of change in COD concentrations and the dominant factors of influence. The results reveal that three factors, i.e., water inflow concentration, gate opening size, and gate opening number, are the dominant factors of influence, and there are logarithmic relationships between the rate of change in COD concentration in the SCRRs and these factors.

  2. Waste retrieval sluicing system vapor sampling and analysis plan for evaluation of organic emissions, process test phase III

    International Nuclear Information System (INIS)

    SASAKI, L.M.

    1999-01-01

    This sampling and analysis plan identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained to address vapor issues related to the sluicing of tank 241-C-106. Sampling will be performed in accordance with Waste Retrieval Sluicing System Emissions Collection Phase III (Jones 1999) and Process Test Plan Phase III, Waste Retrieval Sluicing System Emissions Collection (Powers 1999). Analytical requirements include those specified in Request for Ecology Concurrence on Draft Strategy/Path Forward to Address Concerns Regarding Organic Emissions from C-106 Sluicing Activities (Peterson 1998). The Waste Retrieval Sluicing System was installed to retrieve and transfer high-heat sludge from tank 241-C-106 to tank 241-AY-102, which is designed for high-heat waste storage. During initial sluicing of tank 241-C-106 in November 1998, operations were halted due to detection of unexpected high volatile organic compounds in emissions that exceeded regulatory permit limits. Several workers also reported smelling sharp odors and throat irritation. Vapor grab samples from the 296-C-006 ventilation system were taken as soon as possible after detection; the analyses indicated that volatile and semi-volatile organic compounds were present. In December 1998, a process test (phase I) was conducted in which the pumps in tanks 241-C-106 and 241-AY-102 were operated and vapor samples obtained to determine constituents that may be present during active sluicing of tank 241-C-106. The process test was suspended when a jumper leak was detected. On March 7, 1999, phase I1 of the process test was performed; the sluicing system was operated for approximately 7 hours and was ended using the controlled shutdown method when the allowable amount of solids were transferred to 241-AY-102. The phase II test was successful, however, further testing is required to obtain vapor samples at higher emission levels

  3. Calibration of submerged multi-sluice gates

    Directory of Open Access Journals (Sweden)

    Mohamed F. Sauida

    2014-09-01

    The main objective of this work is to study experimentally and verify empirically the different parameters affecting the discharge through submerged multiple sluice gates (i.e., the expansion ratios, gates operational management, etc.. Using multiple regression analysis of the experimental results, a general equation for discharge coefficient is developed. The results show, that the increase in the expansion ratio and the asymmetric operation of gates, give higher values for the discharge coefficient. The obtained predictions of the discharge coefficient using the developed equations are compared to the experimental data. The present developed equations showed good consistency and high accuracy.

  4. Chemical and chemically-related considerations associated with sluicing tank C-106 waste to tank AY-102

    International Nuclear Information System (INIS)

    Reynolds, D.A.

    1997-01-01

    New data on tank 241-C-106 were obtained from grab sampling and from compatibility testing of tank C-106 and tank AY-102 wastes. All chemistry-associated and other compatibility Information compiled in this report strongly suggests that the sluicing of the contents of tank C-106, in accord with appropriate controls, will pose no unacceptable risk to workers, public safety, or the environment. In addition, it is expected that the sluicing operation will successfully resolve the High-Heat Safety Issue for tank C-106

  5. Environmental management through sluice gated bed-dam: a revived strategy for the control of Anopheles fluviatilis breeding in streams

    Science.gov (United States)

    Sahu, S.S.; Gunasekaran, K.; Jambulingam, P.

    2014-01-01

    Background & objectives: Integrated vector management (IVM) emphasizes sustainable eco-friendly methods and minimal use of chemicals. In this context, the present study highlights the environmental control of breeding of Anopheles fluviatilis, the primary malaria vector, through water management in a natural stream in Koraput district, Odisha, India. Methods: The District Rural Development Agency (DRDA), Koraput, constructed two bed-dams across streams, one in Barigaon and the other in Pipalapodar village. The bed-dam in the former village was fitted with two sluice gates whereas the bed dam constructed in the latter village was without the sluice gate. The sluice gates were opened once in a week on a fixed day to flush out the water from the dam. Anopheles immatures were sampled systematically in the streams using a dipper for density measurement and species composition. Results: There was a reduction of 84.9 per cent in the proportion of positive dips for Anopheles larvae/pupae and a reduction of 98.4 per cent in immature density (number/dip) of An. fluviatilis in the experimental downstream compared to the control following opening of the sluice gates. Interpretation & conclusions: Our findins showed that opening of sluice gates of the bed-dam regularly once in a week resulted in the control of vector breeding in the downstream due to the flushing effect of the water released with a high flow from the bed-dam that stagnated water in the upstream. The outcome of the study encourages upscaling this measure to other areas, wherever feasible. PMID:25297364

  6. Nonradioactive air emissions notice of construction, Project W-320, 241-C-106 tank sluicing

    International Nuclear Information System (INIS)

    Hays, C.B.

    1998-01-01

    This document serves as a Notice of Construction for the Phase 2 activities of Project W-320, 241-C-106 Tank Sluicing, pursuant to the requirements of Washington Administrative Codes (WAC) 173-400 and 173-460. Phased permitting for Project W-320 was discussed with the Washington State Department of Ecology (Ecology) on November 2, 1993. In April 1994, it was deemed unnecessary because the Phase 1 activities did not constitute a new source of emissions and therefore did not require approval from Ecology. The 241-C-106 tank is a 2-million liter capacity, single-shell tank (SST) used for radioactive waste storage since 1947. Between mid-1963 and mid-1969, 241-C-106 tank received high-heat waste, PUREX (plutonium-uranium extraction) Facility high-level waste, and strontium-bearing solids from the strontium and cesium recovery activities. In 1971, temperatures exceeding 99 C were observed in the tank, and therefore, a ventilation system was installed to cool the tank. In addition, approximately 22,712 liters of cooling water are added to the tank each month to prevent the sludge from drying out and overheating. Excessive drying of the sludge could result in possible structural damage. The current radiolytic heat generation rate has been calculated at 32 kilowatts (kW) plus or minus 6 kW. The 241-C-106 tank was withdrawn from service in 1979 and currently is categorized as not leaking. The heat generation in 241-C-106 tank has been identified as a key safety issue on the Hanford Site. The evaporative cooling provided by the added water during operation and/or sluicing maintains the 241-C-106 tank within its specified operating temperature limits. Project W-320, 241-C-106 Tank Sluicing, will mobilize and remove the heat-generating sludge, allowing the water additions to cease. Following sludge removal, the 241-C-106 tank could be placed in a safe, interim stabilized condition. Tank-to-tank sluicing, an existing, proven technology, will provide the earliest possible

  7. Nonradioactive air emissions notice of construction, Project W-320, 241-C-106 tank sluicing

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1998-01-28

    This document serves as a Notice of Construction for the Phase 2 activities of Project W-320, 241-C-106 Tank Sluicing, pursuant to the requirements of Washington Administrative Codes (WAC) 173-400 and 173-460. Phased permitting for Project W-320 was discussed with the Washington State Department of Ecology (Ecology) on November 2, 1993. In April 1994, it was deemed unnecessary because the Phase 1 activities did not constitute a new source of emissions and therefore did not require approval from Ecology. The 241-C-106 tank is a 2-million liter capacity, single-shell tank (SST) used for radioactive waste storage since 1947. Between mid-1963 and mid-1969, 241-C-106 tank received high-heat waste, PUREX (plutonium-uranium extraction) Facility high-level waste, and strontium-bearing solids from the strontium and cesium recovery activities. In 1971, temperatures exceeding 99 C were observed in the tank, and therefore, a ventilation system was installed to cool the tank. In addition, approximately 22,712 liters of cooling water are added to the tank each month to prevent the sludge from drying out and overheating. Excessive drying of the sludge could result in possible structural damage. The current radiolytic heat generation rate has been calculated at 32 kilowatts (kW) plus or minus 6 kW. The 241-C-106 tank was withdrawn from service in 1979 and currently is categorized as not leaking. The heat generation in 241-C-106 tank has been identified as a key safety issue on the Hanford Site. The evaporative cooling provided by the added water during operation and/or sluicing maintains the 241-C-106 tank within its specified operating temperature limits. Project W-320, 241-C-106 Tank Sluicing, will mobilize and remove the heat-generating sludge, allowing the water additions to cease. Following sludge removal, the 241-C-106 tank could be placed in a safe, interim stabilized condition. Tank-to-tank sluicing, an existing, proven technology, will provide the earliest possible

  8. Contingency plan for the Old Hydrofracture Facility Tanks Sluicing Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-06-01

    This revised contingency plan addresses potential scenarios involving the release of radioactively contaminated waste from the Old Hydrofracture Facility Tanks Contents Removal project to the environment. The tanks are located at the Oak Ridge National Laboratory. The project involves sluicing the contents of the five underground tanks to mix the sludge and supernatant layers, and pumping the mixture to the Melton Valley Storage Tanks (MVST) for future processing. The sluicing system to be used for the project consists of a spray nozzle designated the open-quotes Borehole Miner,close quotes with an associated pump; in-tank submersible pumps to transfer tank contents from the sluice tanks to the recycle tank; high-pressure pumps providing slurry circulation and slurry transport to the MVST; piping; a ventilation system; a process water system; an instrumentation and control system centered around a programmable logic controller; a video monitoring system; and auxiliary equipment. The earlier version of this plan, which was developed during the preliminary design phase of the project, identified eight scenarios in which waste from the tanks might be released to the environment as a result of unanticipated equipment failure or an accident (e.g., vehicular accident). One of those scenarios, nuclear criticality, is no longer addressed by this plan because the tank waste will be isotopically diluted before sluicing begins. The other seven scenarios have been combined into three, and a fourth, Borehole Miner Failure, has been added as follows: (1) underground release from the tanks; (2) aboveground release or spill from the sluicing system, a tank riser, or the transfer pipeline; (3) release of unfiltered air through the ventilation system; and (4) Borehole Miner arm retraction failure. Methods for preventing, detecting, and responding to each release scenario are set out in the plan

  9. Actor coalitions and implementation in strategic delta planning: Opening the Haringvliet sluices in the Netherlands

    Science.gov (United States)

    Vermoolen, Myrthe; Hermans, Leon

    2016-04-01

    The sustained development of urbanizing deltas is influenced by natural and societal processes. These processes are characterized by their long time span, in which conflicting interests of different stakeholders have to be reconciled. Reaching consent between actors is a challenge itself, but maintaining this consent throughout different stages of strategic planning - from advocacy and agenda setting to implementation - over these long periods of time is even more difficult. The implementation stage still includes many different actors involved, some of which are different than the ones who agreed before, due to both the long run of the strategic delta planning, and to a shift of tasks and responsibilities. Thus, implementation of strategic plans often features delays, deviations of agreed plans and unintended outcomes. A key question therefore is how coalition dynamics in (pre-)planning stages influence and are influenced by the coalition dynamics during implementation. The different stages in strategic planning are often studied from either a plan formulation or an implementation perspective, but the connection between the two proves an important bottleneck for strategic planning in deltas. For instance, many building with nature solutions are still in their pilot-phase, and their upscaling can profit from lessons concerning past implementation efforts. The proposed contribution will use the case of the management of the Dutch Haringvliet sluices and the decision ('Kierbesluit') in 2000 to put these sluices ajar, to study the link between the different strategic delta planning stages and the role of the formation and change of actor coalitions herein. With the completion of the Haringvliet dam with outlet sluices in 1970, the Haringvliet estuary of the rivers Rhine and Meuse was closed off from the sea, creating a fresh water lake. This was done to make the Dutch Southwest delta safe from flooding, and had positive effects for agricultural water supply and

  10. Effect of Riffle Height and Spacing of a Sluice Board on Placer Gold ...

    African Journals Online (AJOL)

    Michael

    2017-06-01

    Jun 1, 2017 ... turbulence formed in the flow because the angular speeds of the whirl flow .... (6). Where the liquid gets in contact with the surface of the sluice board, the height of fluid, h = 0, and v = 0. ..... American Society for Quality (ASQ).

  11. Complex composition film condensation in the sluice device of an electron microscope

    International Nuclear Information System (INIS)

    Kukuev, V.I.; Lesovoj, M.V.; Vlasov, D.A.; Malygin, M.V.; Domashevskaya, Eh.P.; Tomashpol'skij, Yu.Ya.

    1994-01-01

    Based on the sluice device of an electron microscope a system is developed for material laser evaporation and vapor condensation on a substrate, situated in the microscope specimen holder. Substrate heating by laser radiation to 100 deg C is used. The system is applied for investigating growth of high-temperature superconductor films

  12. Tank 241-C-106 past-practice sluicing waste retrieval, Hanford Site, Richland, Washington. Environmental Assessment

    International Nuclear Information System (INIS)

    1995-02-01

    The US Department of Energy (DOE) needs to take action to eliminate safety concerns with storage of the high-heat waste in Tank 241-C-106 (Tank C-106), and demonstrate a tank waste retrieval technology. This Environmental Assessment (EA) was prepared to analyze the potential impacts associated with the proposed action, past-practice sluicing of Tank C-106, an underground single-shell tank (SST). Past-practice sluicing is defined as the mode of waste retrieval used extensively in the past at the Hanford Site on the large underground waste tanks, and involves introducing a high-volume, low-pressure stream of liquid to mobilize sludge waste prior to pumping. It is proposed to retrieve the waste from Tank C-106 because this waste is classified not only as transuranic and high-level, but also as high-heat, which is caused by the radioactive decay of strontium. This waste characteristic has led DOE to place Tank C-106 on the safety ''Watchlist.''

  13. Project W-320, waste retrieval sluicing system: BIO/SER implementation matrices

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This document provides verification that the safety related commitments specified in HNF-SD-WM-810-001, Addendum 1 for the Waste Retrieval Sluicing System, Project W-320 and Project W-320 Safety Evaluation Report (SER), have been implemented in the project hardware, procedures and administrative controls. Four appendices include matrices which show where the 810 commitments are implemented for limiting conditions of operation and surveillance requirements controls, administrative controls, defense-in-depth controls and controls discussed in 810 Addendum 1. A fifth appendix includes the implementation of Project W-320 SER issues and provisions

  14. Project W-320, 241-C-106 sluicing: Construction specification W-320-C1

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits

  15. Project management plan for Project W-320, Tank 241-C-106 sluicing. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, D.R.

    1994-07-01

    A major mission of the US Department of Energy (DOE) is the permanent disposal of Hanford Site defense wastes by utilizing safe, environmentally acceptable, and cost-effective disposal methods that meet applicable regulations. The Tank Waste Remediation System (TWRS) Program was established at the Hanford Site to manage and control activities specific to the remediation of safety watch list tanks, including high-heat-producing tanks, and for the ultimate characterization, retrieval, pretreatment, and disposal of the low- and high-level fractions of the tank waste. Project W-320, Tank 241-C-106 Sluicing, provides the methodology, equipment, utilities, and facilities necessary for retrieving the high-heat waste from single-shell tank (SST) 24-C-106. Project W-320 is a fiscal year (FY) 1993 expense-funded major project, and has a design life of 2 years. Retrieval of the waste in tank 241-C-106 will be accomplished through mobilization of the sludge into a pumpable slurry using past-practice sluicing. The waste is then transferred directly to a double-shell tank for interim storage, subsequent pretreatment, and eventual disposal. A detailed description of the management organization and responsibilities of all participants is presented in this document.

  16. Project management plan for Project W-320, Tank 241-C-106 sluicing. Revision 2

    International Nuclear Information System (INIS)

    Phillips, D.R.

    1994-07-01

    A major mission of the US Department of Energy (DOE) is the permanent disposal of Hanford Site defense wastes by utilizing safe, environmentally acceptable, and cost-effective disposal methods that meet applicable regulations. The Tank Waste Remediation System (TWRS) Program was established at the Hanford Site to manage and control activities specific to the remediation of safety watch list tanks, including high-heat-producing tanks, and for the ultimate characterization, retrieval, pretreatment, and disposal of the low- and high-level fractions of the tank waste. Project W-320, Tank 241-C-106 Sluicing, provides the methodology, equipment, utilities, and facilities necessary for retrieving the high-heat waste from single-shell tank (SST) 24-C-106. Project W-320 is a fiscal year (FY) 1993 expense-funded major project, and has a design life of 2 years. Retrieval of the waste in tank 241-C-106 will be accomplished through mobilization of the sludge into a pumpable slurry using past-practice sluicing. The waste is then transferred directly to a double-shell tank for interim storage, subsequent pretreatment, and eventual disposal. A detailed description of the management organization and responsibilities of all participants is presented in this document

  17. Project W-320, 241-C-106 sluicing: Construction specification W-320-C2

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits

  18. Project W-320, 241-C-106 sluicing: Construction specification W-320-C2

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-07-20

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits.

  19. Project W-320, 241-C-106 sluicing: Construction specification W-320-C6

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits

  20. Project W-320, 241-C-106 sluicing: Construction specification W-320-C5

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits

  1. Project W-320, 241-C-106 sluicing: Construction specification W-320-C7

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits

  2. Project W-320, 241-C-106 sluicing: Construction specification W-320-C5

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-07-20

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits.

  3. Project W-320, 241-C-106 sluicing: Construction specification W-320-C7

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-07-20

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits.

  4. Project W-320, 241-C-106 sluicing: Construction specification W-320-C6

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-07-20

    This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits.

  5. Integrated Methodologies for the 3D Survey and the Structural Monitoring of Industrial Archaeology: The Case of the Casalecchio di Reno Sluice, Italy

    Directory of Open Access Journals (Sweden)

    Gabriele Bitelli

    2011-01-01

    Full Text Available The paper presents an example of integrated surveying and monitoring activities for the control of an ancient structure, the Casalecchio di Reno sluice, located near Bologna, Italy. Several geomatic techniques were applied (classical topography, high-precision spirit levelling, terrestrial laser scanning, digital close-range photogrammetry, and thermal imagery. All these measurements were put together in a unique reference system and used in order to study the stability and the movements of the structure over the period of time observed. Moreover, the metrical investigations allowed the creation of a 3D model of the structure, and the comparison between two situations, before and after the serious damages suffered by the sluice during the winter season 2008-2009. Along with the detailed investigations performed on individual portions of the structure, an analysis of the whole sluice, carried out at a regional scale, was done via the use of aerial photogrammetry, using both recently acquired images and historical photogrammetric coverage. The measurements were carried out as part of a major consolidation and restoration activity, carried out by the “Consorzio della Chiusa di Casalecchio e del Canale di Reno”.

  6. An inversion of the estuarine circulation by sluice water discharge and its impact on suspended sediment transport

    Science.gov (United States)

    Schulz, Kirstin; Gerkema, Theo

    2018-01-01

    The Wadden Sea is characterized by a complex topography of branching channels and intertidal flats, in which the interplay between fresh water discharges, wind forcing and the tidal current causes sediment transport rates and direction to be highly variable in space and time. During three field campaigns, indications of a negative estuarine circulation have been found in a channel adjacent to the coast in the Western Dutch Wadden Sea. Contrary to the classical picture of estuarine circulation, a periodic density stratification was observed that builds up during flood and breaks down during ebb. This can be related to a large freshwater source at the mouth of the channel, the sluice in Kornwerderzand. In this study, observations of this phenomenon are presented, and with the help of a numerical model the different drivers for residual suspended matter transport in this area, namely tidal asymmetries in the current velocity and the above mentioned periodic stratification, are investigated. It is found that the residual current in the area of interest points in ebb direction, caused by both the elongated ebb flow phase and the periodic stratification. On the contrary, the stronger flood currents cause a transport of suspended matter in flood direction. This transport is counteracted and therefore diminished by the effects of the sluice discharge.

  7. Innovative technology summary report: Confined sluicing end effector

    International Nuclear Information System (INIS)

    1998-09-01

    A Confined Sluicing End-Effector (CSEE) was field tested during the summer of 1997 in Tank W-3, one of the Gunite and Associated Tanks (GAAT) at the Oak Ridge Reservation (ORR). It should be noted that the specific device used at the Oak Ridge Reservation demonstration was the Sludge Retrieval End-Effector (SREE), although in common usage it is referred to as the CSEE. Deployed by the Modified Light-Duty Utility Arm (MLDUA) and the Houdini remotely operated vehicle (ROV), the CSEE was used to mobilize and retrieve waste from the tank. After removing the waste, the CSEE was used to scarify the gunite walls of Tank W-3, removing approximately 0.1 in of material. The CSEE uses three rotating water-jets to direct a short-range pressurized jet of water to effectively mobilize the waste. Simultaneously, the water and dislodged tank waste, or scarified materials, are aspirated using a water-jet pump-driven conveyance system. The material is then pumped outside of the tank, where it can be stored for treatment. The technology, its performance, uses, cost, and regulatory issues are discussed

  8. Waste retrieval sluicing system data acquisition system acceptance test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This document describes the test procedure for the Project W-320 Tank C-106 Sluicing Data Acquisition System (W-320 DAS). The Software Test portion will test items identified in the WRSS DAS System Description (SD), HNF-2115. Traceability to HNF-2115 will be via a reference that follows in parenthesis, after the test section title. The Field Test portion will test sensor operability, analog to digital conversion, and alarm setpoints for field instrumentation. The W-320 DAS supplies data to assist thermal modeling of tanks 241-C-106 and 241-AY-102. It is designed to be a central repository for information from sources that would otherwise have to be read, recorded, and integrated manually. Thus, completion of the DAS requires communication with several different data collection devices and output to a usable PC data formats. This test procedure will demonstrate that the DAS functions as required by the project requirements stated in Section 3 of the W-320 DAS System Description, HNF-2115

  9. Bird casualties and wind turbines near the Kreekrak sluices of Zeeland

    International Nuclear Information System (INIS)

    Musters, C.J.M.; Noordervliet, M.A.W.; Ter Keurs, W.J.

    1995-03-01

    The impact of wind turbines on birds was investigated for an estuary, situated near the North Sea coast in the Dutch province of Zeeland, with large amount of bird migration. Five 250 kW, three-bladed 25m, 40 rpm turbines were installed on the western side of a dike. The distance between the turbines is 125 m. Since 1 April 1990 the turbines have been in action almost continuously. The study on the title subject was set up to investigate the number of bird casualties caused by the five wind turbines near the sluices of Kreekrak and the number that may be expected to be caused by a total of 20 turbines. The study also focused on the number of casualties among rare birds in relation to those among the common birds as a result of the wind turbines in the Kreekrak area. An area of 125 x 125 m around each wind turbine, consisting partly of land and partly of water, was searched for dead birds every other day during a period of one year (28 April 1990 - 29 April 1991). During this one-year period, the bodies of 26 birds of 17 different species were found; six birds were certainly or almost certainly killed by the turbines. In three other cases, the birds may have died because of the turbines, while in the case of eight birds, it was not possible to determine the cause of death. The remaining nine birds were not killed by the wind turbines. The annual number of bird victims expected following the installation of 20 wind turbines was estimated at a minimum of 7 and a maximum of 142. For each species a correlation was found between the number of victims and the estimated number of visitors to the area. This suggests that the rare species among the birds were not excessively endangered by the turbines. The number of bird casualties per turbine was low in comparison with the results of other Dutch investigations. On the basis of these results, it is concluded that there is no reason to advise against increasing the number of wind turbines near the sluices of Kreekrak to 20. 3

  10. Tank vapor sampling and analysis data package for tank 241-C-106 waste retrieval sluicing system process test phase III

    Energy Technology Data Exchange (ETDEWEB)

    LOCKREM, L.L.

    1999-08-13

    This data package presents sampling data and analytical results from the March 28, 1999, vapor sampling of Hanford Site single-shell tank 241-C-106 during active sluicing. Samples were obtained from the 296-C-006 ventilation system stack and ambient air at several locations. Characterization Project Operations (CPO) was responsible for the collection of all SUMMATM canister samples. The Special Analytical Support (SAS) vapor team was responsible for the collection of all triple sorbent trap (TST), sorbent tube train (STT), polyurethane foam (PUF), and particulate filter samples collected at the 296-C-006 stack. The SAS vapor team used the non-electrical vapor sampling (NEVS) system to collect samples of the air, gases, and vapors from the 296-C-006 stack. The SAS vapor team collected and analyzed these samples for Lockheed Martin Hanford Corporation (LMHC) and Tank Waste Remediation System (TWRS) in accordance with the sampling and analytical requirements specified in the Waste Retrieval Sluicing System Vapor Sampling and Analysis Plan (SAP) for Evaluation of Organic Emissions, Process Test Phase III, HNF-4212, Rev. 0-A, (LMHC, 1999). All samples were stored in a secured Radioactive Materials Area (RMA) until the samples were radiologically released and received by SAS for analysis. The Waste Sampling and Characterization Facility (WSCF) performed the radiological analyses. The samples were received on April 5, 1999.

  11. Permitting plan for project W-320 tank 241-C-106 waste retrieval sluicing system (WRSS)

    International Nuclear Information System (INIS)

    Symons, G.A.

    1997-01-01

    This document describes the permitting plan for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). A comprehensive review of environmental regulations have indicated that several environmental reviews [e.g. National Environmental Policy Act (NEPA), State Environmental Policy Act (SEPA)], permits, and approvals are required prior to construction or operation of the facility. The environmental reviews, permits and approvals, as well the regulatory authority, potentially applicable to the Tank 241-C-106 WRSS include the following: for NEPA - U.S. Department of Energy-Headquarters: Action Description Memorandum, Environmental Assessment, Categorical Exclusion, and Environmental Impact Statement; and for SEPA - State of Washington Department of Ecology (Ecology) Determination of Nonsignificance, Mitigated Determination of Nonsignificance, Determination of Significance, and SEPA Environmental Checklist

  12. Controlling The Surface Water of Shatt Al Arab River by using Sluice Gates

    Directory of Open Access Journals (Sweden)

    Ahmed Naseh Ahmed Hamdan

    2016-03-01

    Full Text Available The purpose of this study is to find hydrodynamic simulations of river water by controlging gates in Shatt Al Arab river. This river is formed by the meeting of the Tigris and Euphrates rivers near the city of Qurna in the south of Iraq, and it pours into the Arabian Gulf. Hydrodynamic simulations give a proper understanding performance and optimize utilization of the gates controlging the water level. Three different sluice gates opening cases simulate the water surface level using HEC-RAS in Shatt Al Arab river. These cases where being studied within two situations of Tide (the highest high water level and the lowest low water level within the downstream of Shatt Al Arab river. The study also deals with six cases of flow rates in upstream of Shatt Al Arab river. Hec-Ras model is produced by US Army for analyzing river system. This model could simulate steady and unsteady open channel flow.

  13. Structure modulates similarity-based interference in sluicing: An eye tracking study.

    Directory of Open Access Journals (Sweden)

    Jesse A. Harris

    2015-12-01

    Full Text Available In cue-based content-addressable approaches to memory, a target and its competitors are retrieved in parallel from memory via a fast, associative cue-matching procedure under a severely limited focus of attention. Such a parallel matching procedure could in principle ignore the serial order or hierarchical structure characteristic of linguistic relations. I present an eye tracking while reading experiment that investigates whether the sentential position of a potential antecedent modulates the strength of similarity-based interference, a well-studied effect in which increased similarity in features between a target and its competitors results in slower and less accurate retrieval overall. The manipulation trades on an independently established Locality bias in sluiced structures to associate a wh-remnant (which ones in clausal ellipsis with the most local correlate (some wines, as in The tourists enjoyed some wines, but I don’t know which ones. The findings generally support cue-based parsing models of sentence processing that are subject to similarity-based interference in retrieval, and provide additional support to the growing body of evidence that retrieval is sensitive to both the structural position of a target antecedent and its competitors, and the specificity of retrieval cues.

  14. Stagnation, circulation, and erosion of granular materials through belt conveyor sluice gate

    Science.gov (United States)

    Pohlman, Nicholas; Moralda, Michael; Dunne, Ryan

    2013-11-01

    Control of flow rates in conversion reactors for discrete materials like biomass can be achieved in belt conveyors through a combination of belt speed, hopper size, and aperture opening. As material is extracted from the bottom of the storage hopper, other material cannot achieve plug flow and therefore is restricted from exiting through a sluice-gate type opening. The excess material moves vertically from the opening causing a pile up and recirculation back along the free surface of the hopper. Experimental results obtained through high speed imaging show the position of the stagnation point as well as the rate of circulation is dependent on the mass flow rate achieved and instantaneous fill level. The movement of material into the plug flow along the belt allows verification of deposition models on erodible beds rather than rigid surfaces with artificial roughness of glued particles. Similarly, the pile-up at the exit influences the efficiency of the transport affecting the narrow energy return on investment of biomass resources. The laboratory-scale behavior can therefore be translated into industrial performance metrics for increased operational efficiency. This work is supported by the NSF REU Site Operation E-Tank under award number 1156789.

  15. Impact of sediments resuspension on metal solubilization and water quality during recurrent reservoir sluicing management

    Energy Technology Data Exchange (ETDEWEB)

    Frémion, Franck; Courtin-Nomade, Alexandra [Groupement de Recherche Eau Sol Environnement, Université de Limoges, 123 avenue Albert Thomas, 87060 Limoges Cedex (France); Bordas, François, E-mail: francois.bordas@unilim.fr [Groupement de Recherche Eau Sol Environnement, Université de Limoges, 123 avenue Albert Thomas, 87060 Limoges Cedex (France); Lenain, Jean-François [Groupement de Recherche Eau Sol Environnement, Université de Limoges, 123 avenue Albert Thomas, 87060 Limoges Cedex (France); Jugé, Philippe [CETU – ELMIS Ingénieries, Université François Rabelais, , 60 Rue du Plat d' Étain, 37000 Tours (France); Kestens, Tim [EDF – DPIH, Unité de Production Centre, 19 bis avenue de la Révolution, BP 406, 87012 Limoges Cedex (France); Mourier, Brice [Groupement de Recherche Eau Sol Environnement, Université de Limoges, 123 avenue Albert Thomas, 87060 Limoges Cedex (France)

    2016-08-15

    In dam contexts, sluicing operations can be performed to reestablish sediments continuity, as proposed by the EU Water Framework Directive, as well as to preserve the reservoirs' water storage capacity. Such management permits the rapid release of high quantities of reservoir sediments through the opening of dam bottom valves. This work aims to study the impact of such operation on the evolution of environmental physicochemical conditions notably changes in dissolved metallic elements concentrations (Al, As, Cd, Cr, Cu, Fe, Mn, Ni, Pb, Zn) through field and laboratory investigations. Results were interpreted in terms of concentrations and fluxes, and compared with data collected on an annual basis regarding both suspended matter and metallic elements. The release of high quantities of sediments (4,500 tons dry weight in 24 h), with concentrations representing up to 300 times the inter-annual mean suspended sediments discharge, significantly modified water parameters, notably solid/liquid (S/L) ratio, pH and redox conditions. Despite the fact that they are mainly trapped in stable phases, a clear increase of the solubilized metals content was measured, representing up to 60 times the maximum values of current exploitation. This solubilization is related to desorption phenomena from sediments through changes in chemical equilibriums as highlighted by laboratory characterizations and experiments. These chemical modifications are mainly attributed to S/L ratio variations. Indeed, the low S/L ratios (≤ 1.3 g·L{sup −1}) measured in situ are typically the ones for which metals solubilization is the highest, as shown by laboratory experiments. Additional thermodynamic modeling highlighted that the decrease in pH measured during the operation favors the release of the free forms of metallic elements (Al and Cu), and decreases the OM complexation influence. These changes, either in term of physical conditions or speciation, increasing metals long term

  16. Tank vapor sampling and analysis data package for tank 241-C-106 waste retrieval sluicing system process test phase III, sampled March 28, 1999

    International Nuclear Information System (INIS)

    LOCKREM, L.L.

    1999-01-01

    This data package presents sampling data and analytical results from the March 28, 1999, vapor sampling of Hanford Site single-shell tank 241-C-106 during active sluicing. Samples were obtained from the 296-C-006 ventilation system stack and ambient air at several locations. Characterization Project Operations (CPO) was responsible for the collection of all SUMMATM canister samples. The Special Analytical Support (SAS) vapor team was responsible for the collection of all triple sorbent trap (TST), sorbent tube train (STT), polyurethane foam (PUF), and particulate filter samples collected at the 296-C-006 stack. The SAS vapor team used the non-electrical vapor sampling (NEVS) system to collect samples of the air, gases, and vapors from the 296-C-006 stack. The SAS vapor team collected and analyzed these samples for Lockheed Martin Hanford Corporation (LMHC) and Tank Waste Remediation System (TWRS) in accordance with the sampling and analytical requirements specified in the Waste Retrieval Sluicing System Vapor Sampling and Analysis Plan (SAP) for Evaluation of Organic Emissions, Process Test Phase III, HNF-4212, Rev. 0-A, (LMHC, 1999). All samples were stored in a secured Radioactive Materials Area (RMA) until the samples were radiologically released and received by SAS for analysis. The Waste Sampling and Characterization Facility (WSCF) performed the radiological analyses. The samples were received on April 5, 1999

  17. Imaging through obscurations for sluicing operations in the waste storage tanks

    International Nuclear Information System (INIS)

    Peters, T.J.; McMakin, D.L.; Sheen, D.M.; Chieda, M.A.

    1994-08-01

    Waste remediators have identified that surveillance of waste remediation operations and periodic inspections of stored waste are required under very demanding and difficult viewing environments. In many cases, obscurants such as dust or water vapor are generated as part of the remediation activity. Methods are required for viewing or imaging beyond the normal visual spectrum. Work space images guide the movement of remediation equipment, creating a need for rapidly updated, near real-time imaging capability. In addition, there is a need for three-dimensional topographical data to determine the contours of the wastes, to plan retrieval campaigns, and to provide a three-dimensional map of a robot's work space as basis for collision avoidance. Three basic imaging techniques were evaluated: optical, acoustic and radar. The optical imaging methods that were examined used cameras which operated in the visible region and near-infrared region and infrared cameras which operated in the 3--5 micron and 8--12 micron wavelength regions. Various passive and active lighting schemes were tested, as well as the use of filters to eliminate reflection in the visible region. Image enhancement software was used to extend the range where visual techniques could be used. In addition, the operation of a laser range finder, which operated at 0.835 microns, was tested when fog/water droplets were suspended in the air. The acoustic technique involved using commercial acoustic sensors, operating at approximately 50 kHz and 215 kHz, to determine the attenuation of the acoustic beam in a high-humidity environment. The radar imaging methods involved performing millimeter wave (94 GHz) attenuation measurement sin the various simulated sluicing environments and performing preliminary experimental imaging studies using a W-Band (75--110 GHz) linearly scanned transceiver in a laboratory environment. The results of the tests are discussed

  18. Safety evaluation for packaging transportation of equipment for tank 241-C-106 waste sluicing system

    International Nuclear Information System (INIS)

    Calmus, D.B.

    1994-01-01

    A Waste Sluicing System (WSS) is scheduled for installation in nd waste storage tank 241-C-106 (106-C). The WSS will transfer high rating sludge from single shell tank 106-C to double shell waste tank 241-AY-102 (102-AY). Prior to installation of the WSS, a heel pump and a transfer pump will be removed from tank 106-C and an agitator pump will be removed from tank 102-AY. Special flexible receivers will be used to contain the pumps during removal from the tanks. After equipment removal, the flexible receivers will be placed in separate containers (packagings). The packaging and contents (packages) will be transferred from the Tank Farms to the Central Waste Complex (CWC) for interim storage and then to T Plant for evaluation and processing for final disposition. Two sizes of packagings will be provided for transferring the equipment from the Tank Farms to the interim storage facility. The packagings will be designated as the WSSP-1 and WSSP-2 packagings throughout the remainder of this Safety Evaluation for Packaging (SEP). The WSSP-1 packagings will transport the heel and transfer pumps from 106-C and the WSSP-2 packaging will transport the agitator pump from 102-AY. The WSSP-1 and WSSP-2 packagings are similar except for the length

  19. Contingency plan for the Old Hydrofracture Facility tanks sluicing project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-10-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), plans to begin a sluicing (flushing) and pumping project to remove the contents from five inactive, underground storage tanks at the Old Hydrofracture Facility (OHF) at the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The tank contents will be transferred to the Melton Valley Storage Tanks, which are part of the active waste treatment system at ORNL. The purpose of the project is to minimize the risk of leaking the highly radioactive material to the environment. The five OHF tanks each contain a layer of sludge and a layer of supernatant. Based on a sampling project undertaken in 1995, the sludge in the tanks has been characterized as transuranic and mixed waste and the supernatants have been characterized as mixed waste. The combined radioactivity of the contents of the five tanks is approximately 29,500 Ci. This contingency plan is based on the preliminary design for the project and describes a series of potential accident/release scenarios for the project. It outlines Energy Systems' preliminary plans for prevention, detection, and mitigation. Prevention/detection methods range from using doubly contained pipelines to alarmed sensors and automatic pump cutoff systems. Plans for mitigation range from pumping leaked fluids from the built-in tank drainage systems and cleaning up spilled liquids to personnel evacuation

  20. Development and testing of single-shell tank waste retrieval technologies: Milestone M-45-01 summary report

    International Nuclear Information System (INIS)

    Shen, E.J.

    1994-08-01

    This report summarizes the activities undertaken to develop single-shell tank (SST) waste retrieval technology and complete scale-model testing. Completion of these activities fulfills the commitment of Milestone M-45-01 of the Hanford Federal Facility Agreement and Consent Order (the Tri-Party Agreement). Initial activities included engineering studies that compiled and evaluated data on all known retrieval technologies. Based on selection criteria incorporating regulatory, safety, and operational issues, several technologies were selected for further evaluation and testing. The testing ranged from small-scale, bench-top evaluations of individual technologies to full-scale integrated tests of multiple subsystems operating concurrently as a system using simulated wastes. The current baseline retrieval method for SSTs is hydraulic sluicing. This method has been used successfully in the past to recover waste from SSTs. Variations of this hydraulic or ''past practice'' sluicing may be used to retrieve the waste from the majority of the SSTs. To minimize the potential for releases to the soil, arm-based retrieval systems may be used to recover waste from tanks that are known or suspected to have leaked. Both hydraulic sluicing and arm-based retrieval will be demonstrated in the first SST. Hydraulic sluicing is expected to retrieve most of the waste, and arm-based retrieval will retrieve wastes that remain after sluicing. Subsequent tanks will be retrieved by either hydraulic sluicing or arm-based methods, but not both. The method will be determined by waste characterization, tank integrity (leak status), and presence of in-tank hardware. Currently, it is assumed that approximately 75% of all SSTs will be retrieved by hydraulic sluicing and the remaining tanks by arm-based methods

  1. Decision analysis for the selection of tank waste retrieval technology

    International Nuclear Information System (INIS)

    DAVIS, FREDDIE J.; DEWEESE, GREGORY C.; PICKETT, WILLIAM W.

    2000-01-01

    The objective of this report is to supplement the C-104 Alternatives Generation and Analysis (AGA) by providing a decision analysis for the alternative technologies described therein. The decision analysis used the Multi-Attribute Utility Analysis (MUA) technique. To the extent possible information will come from the AGA. Where data are not available, elicitation of expert opinion or engineering judgment is used and reviewed by the authors of the AGA. A key element of this particular analysis is the consideration of varying perspectives of parties interested in or affected by the decision. The six alternatives discussed are: sluicing; sluicing with vehicle mounted transfer pump; borehole mining; vehicle with attached sluicing nozzle and pump; articulated arm with attached sluicing nozzle; and mechanical dry retrieval. These are evaluated using four attributes, namely: schedule, cost, environmental impact, and safety

  2. Safety equipment list for 241-C-106 waste retrieval, Project W-320: Revision 1

    International Nuclear Information System (INIS)

    Conner, J.C.

    1994-01-01

    The goals of the C-106 sluicing operation are: (1) to stabilize the tank by reducing the heat load in the tank to less than 42 MJ/hr (40,000 Btu/hour), and (2) to initiate demonstration of single-shell tank (SST) retrieval technology. The purpose of this supporting document (SD) is as follows: (1) to provide safety classifications for items (systems, structures, equipment, components, or parts) for the waste retrieval sluicing system (WRSS), and (2) to document and methodology used to develop safety classifications. Appropriate references are made with regard to use of existing systems, structures, equipments, components, and parts for C-106 single-shell transfer tank located in the C Tank Farm, and 241-AY-102 (AY-102) double shell receiver tanks (DST) located in the Aging Waste Facility (AWF). The Waste Retrieval Sluicing System consists of two transfer lines that would connect the two tanks, one to carry the sluiced waste slurry to AY-102, and the other to return the supernatant liquid to C-106. The supernatant, or alternate fluid, will be used to mobilize waste in C-106 for the sluicing process. The equipment necessary for the WRSS include pumps in each tank, sluicers to direct the supernatant stream in C-106, a slurry distributor in AY-102, HVAC for C-106, instrumentation and control devices, and other existing components as required

  3. Radiological and toxicological calculations for AY-102 and C-106HEPA filters and pre-filters

    International Nuclear Information System (INIS)

    Simpson, T.R.; Van Vleet, R.J.

    1997-01-01

    The high heat content solids in Tank 241-C-106 are to be removed and transferred to Tank 241-AY-102 by sluicing operations, to be authorized under project W-320. Once sluicing operations are underway, the state of these tanks will be transformed from 'unagitated' to 'agitated'. This means that the partition fraction which described the aerosol content of the head space will increase from 1 X 10 - 20 to 1 X 10 -1 . This head space will become much more loaded with suspended material. The nature of this suspended material may change significantly, sluicing may inadvertently bring up radioactive solids which normally would lay under many meters of liquid supernate. It is an enabling assumption that the headspace and filter aerosols in Tank 241-AY-102 are a 90/10 liquid/solid split; there is an unmitigated and mitigated composition. It is an enabling assumption that the sluicing line; the headspace in Tank 241-C-106, and the filters in Tank 241-C-106 contain aerosols which are a 67/33 liquid/solid split; there is an unmitigated and mitigated composition

  4. Consequences of a radioactive surface pool resulting from waste transfer operations between tanks 214-C-106 and 241-AY-102

    International Nuclear Information System (INIS)

    Van Vleet, R.J.

    1997-01-01

    This document contains supporting calculations for quantifying the dose consequences from a pool formed from an underground leak or a-leak from an above grade structure for the Waste Retrieval Sluicing System (Project W-320), i.e., sluicing the contents of Tank 241-C-106 (high heat, SST) into Tank 241-AY-102 (aging waste, DST)

  5. Consequences of a radioactive surface pool resulting from waste transfer operations between tanks 214-C-106 and 241-AY-102

    Energy Technology Data Exchange (ETDEWEB)

    Van Vleet, R.J.

    1997-08-05

    This document contains supporting calculations for quantifying the dose consequences from a pool formed from an underground leak or a-leak from an above grade structure for the Waste Retrieval Sluicing System (Project W-320), i.e., sluicing the contents of Tank 241-C-106 (high heat, SST) into Tank 241-AY-102 (aging waste, DST).

  6. Radiological and toxicological calculations for AY-102 and C-106HEPA filters and pre-filters

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, T.R.; Van Vleet, R.J.

    1997-07-01

    The high heat content solids in Tank 241-C-106 are to be removed and transferred to Tank 241-AY-102 by sluicing operations, to be authorized under project W-320. Once sluicing operations are underway, the state of these tanks will be transformed from `unagitated` to `agitated`. This means that the partition fraction which described the aerosol content of the head space will increase from 1 X 10{sup - 20} to 1 X 10{sup -1}. This head space will become much more loaded with suspended material. The nature of this suspended material may change significantly, sluicing may inadvertently bring up radioactive solids which normally would lay under many meters of liquid supernate. It is an enabling assumption that the headspace and filter aerosols in Tank 241-AY-102 are a 90/10 liquid/solid split; there is an unmitigated and mitigated composition. It is an enabling assumption that the sluicing line; the headspace in Tank 241-C-106, and the filters in Tank 241-C-106 contain aerosols which are a 67/33 liquid/solid split; there is an unmitigated and mitigated composition.

  7. Sludge mobilization with submerged nozzles in horizontal cylindrical tanks

    International Nuclear Information System (INIS)

    Hylton, T.D.; Cummins, R.L.; Youngblood, E.L.; Perona, J.J.

    1995-10-01

    The Melton Valley Storage Tanks (MVSTs) and the evaporator service tanks at the Oak Ridge National Laboratory (ORNL) are used for the collection and storage of liquid low-level waste (LLLW). Wastes collected in these tanks are typically acidic when generated and are neutralized with sodium hydroxide to protect the tanks from corrosion; however, the high pH of the solution causes the formation of insoluble compounds that precipitate. These precipitates formed a sludge layer approximately 0.6 to 1.2 m (2 to 4 ft) deep in the bottom of the tanks. The sludge in the MVSTs and the evaporator service tanks will eventually need to be removed from the tanks and treated for final disposal or transferred to another storage facility. The primary options for removing the sludge include single-point sluicing, use of a floating pump, robotic sluicing, and submerged-nozzle sluicing. The objectives of this study were to (1) evaluate the feasibility of submerged-nozzle sluicing in horizontal cylindrical tanks and (2) obtain experimental data to validate the TEMPEST (time-dependent, energy, momentun, pressure, equation solution in three dimensions) computer code

  8. Chemical compatibility of tank wastes in 241-C-106, 241-AY-101, and 241-AY-102

    International Nuclear Information System (INIS)

    Sederburg, J.P.

    1994-01-01

    This report documents the chemical compatibility of waste types within tanks 241-C-106, 241-AY-101, and 241-AY-102. This information was compiled to facilitate the transfer of tank C-106 waste to tank AY-102 utilizing supernatant from AY-101 as the sluicing medium. This document justifies that no chemical compatibility safety issues currently understood, or theorized from thermodynamic modeling, will result from the intended sluice transfer operation

  9. Percutaneous, radiology-assisted stent implantation by means of a novel prosthesis of the bile duct in cases of inoperable cholangioma. Perkutane radiologische Stentimplantation beim inoperablen Gallengangskarzinom mittels einer neuen Gallengangsprothese

    Energy Technology Data Exchange (ETDEWEB)

    Beck, A; Nanko, N [Freiburg Univ. (Germany, F.R.). Abt. Roentgendiagnostik; Milic, S [Consiglio Nazionale delle Ricerche, Rome (Italy); Volk, B [Freiburg Univ. (Germany, F.R.). Abt. Innere Medizin 1 (Haematologie und Onkologie)

    1989-07-01

    In case of malignant growth causing biliary obstruction, biliary decompression can be achieved by surgery, or by means of external/internal drainage. A novel stent with an F7 outer diameter can be percutaneously introduced and positioned through an F8 sluice, assisted by radiologic and cholangioscopic control, and can be dilated to the required diameter by means of a balloon catheter. The implentation can entirely be done through the sluice.

  10. Project management plan for Waste Area Grouping 5 Old Hydrofracture Facility tanks contents removal at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-02-01

    This revision (Rev. 1) updates the schedule and designation of responsibilities for the Old Hydrofracture Facility (OHF) tanks contents removal project. Ongoing and planned future activities include: cold testing of the sluicing and pumping system; readiness assessment; equipment relocation and assembly; isotopic dilution of fissile radionuclides; sluicing and transfer of the tanks contents; and preparation of the Removal Action Completion Report. The most significant change is that the sluicing and pumping system has been configured by and will be operated by CDM Federal Programs Corporation. In addition, a new technical lead and a new project analyst have been designated within Lockheed Martin Energy Systems, Inc. and Lockheed Martin Energy Research Corp. The schedule for tanks contents removal has been accelerated, with transfer of the final batch of tank slurry now scheduled for March 31, 1998 (instead of November 10, 1998). The OHF sluicing and pumping project is proceeding as a non-time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act. The purpose of the project is to remove the contents from five inactive underground storage tanks, designated T-1, T-2, T-3, T-4, and T-9. The tanks contain an estimated 52,700 gal of liquid and sludge, together comprising a radioactive inventory of approximately 30,000 Ci

  11. Chemical compatibility of tank wastes in tanks 241-C-106, 241-AY-101, and 241-AY-102

    International Nuclear Information System (INIS)

    Sederburg, J.P.

    1994-01-01

    This report documents the chemical compatibility of waste types within tanks 241-C-106, 241-AY-101, and 241-AY-102. This information was compiled to facilitate the transfer of tank 241-C-106 waste to tank 241-AY-102 utilizing supernatant from tank 241-AY-101 as the sluicing medium. This document justifies that no chemical compatibility safety issues currently understood, or theorized from thermodynamic modeling, will result from the intended sluice transfer operation

  12. Old hydrofracture facility tanks contents removal action operations plan at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 1: Text

    International Nuclear Information System (INIS)

    1998-05-01

    This Operations Plan summarizes the operating activities for transferring contents of five low-level (radioactive) liquid waste storage tanks associated with the Old Hydrofracture Facility (OHF) to the Melton Valley Storage Tanks (MVST) for secure storage. The transfer will be accomplished through sluicing and pumping operations which are designed to pump the slurry in a closed circuit system using a sluicing nozzle to resuspend the sludge. Once resuspended, the slurry will be transferred to the MVST. The report documenting the material transfer will be prepared after transfer of the tank materials has been completed. The OBF tanks contain approximately 52,600 gal (199,000 L) of low-level radioactive waste consisting of both sludge and supernatant. This material is residual from the now-abandoned grout injection operations conducted from 1964 to 1980. Total curie content is approximately 30,000 Ci. A sluicing and pumping system has been specifically designed for the OHF tanks contents transfer operations. This system is remotely operated and incorporates a sluicing nozzle and arm (Borehole Miner) originally designed for use in the mining industry. The Borehole Miner is an in-tank device designed to deliver a high pressure jet spray via an extendable nozzle. In addition to removing the waste from the tanks, the use of this equipment will demonstrate applicability for additional underground storage tank cleaning throughout the U.S. Department of Energy complex. Additional components of the complete sluicing and pumping system consist of a high pressure pumping system for transfer to the MVST, a low pressure pumping system for transfer to the recycle tank, a ventilation system for providing negative pressure on tanks, and instrumentation and control systems for remote operation and monitoring

  13. Climate Change Impact Assessment of Dike Safety and Flood Risk in the Vidaa River System

    DEFF Research Database (Denmark)

    Madsen, H.; Sunyer Pinya, Maria Antonia; Larsen, J.

    2013-01-01

    The impact of climate change on the flood risk and dike safety in the Vidaa River system, a cross-border catchment located in the southern part of Jutland, Denmark and northern Germany, is analysed. The river discharges to the Wadden Sea through a tidal sluice, and extreme water level conditions...... in the river system occur in periods of high sea water levels where the sluice is closed and increased catchment run-off take place. Climate model data from the ENSEMBLES data archive are used to assess the changes in climate variables and the resulting effect on catchment run-off. Extreme catchment run......-off is expected to increase about 8 % in 2050 and 14 % in 2100. The changes in sea water level is assessed considering climate projections of mean sea level rise, isostatic changes, and changes in storm surge statistics. At the Vidaa sluice a mean sea level rise of 0.15–0.39 m in 2050 and 0.41–1.11 m in 2010...

  14. System design description for portable 1,000 CFM exhauster Skids POR-007/Skid E and POR-008/Skid F

    International Nuclear Information System (INIS)

    Nelson, O.D.

    1998-01-01

    The primary purpose of the two 1,000 CFM Exhauster Skids, POR-007-SKID E and POR-008-SKID F, is to provide backup to the waste tank primary ventilation systems for tanks 241-C-106 and 241-AY-102, and the AY-102 annulus in the event of a failure during the sluicing of tank 241-C-106 and subsequent transfer of sluiced waste to 241-AY-102. This redundancy is required since both of the tank ventilation systems have been declared as Safety Class systems

  15. Evaluation of riser 14 temperature response

    International Nuclear Information System (INIS)

    OGDEN, D.M.

    1999-01-01

    The initial sluicing activities of Project WRSS resulted in a two month increase in temperatures as measured by the Riser 14 thermocouple tree of tank 241-C-106. While this increase was anticipated, the maximum temperature was higher than expected. An evaluation was performed to determine if adequate subcooling exists in the waste to continue sluicing activities. It was determined that a minimum of 10 F subcooling exists in the waste and that the higher Riser 14 temperatures were the result of higher than assumed waste saturation temperature

  16. Operational tank leak detection and minimization during retrieval

    International Nuclear Information System (INIS)

    Hertzel, J.S.

    1996-03-01

    This report evaluates the activities associated with the retrieval of wastes from the single-shell tanks proposed under the initial Single-Shell Tank Retrieval System. This report focuses on minimizing leakage during retrieval by using effective leak detection and mitigating actions. After reviewing the historical data available on single-shell leakage, and evaluating current leak detection technology, this report concludes that the only currently available leak detection method which can function within the most probable leakage range is the mass balance system. If utilized after each sluicing campaign, this method should allow detection at a leakage value well below the leakage value where significant health effects occur which is calculated for each tank. Furthermore, this report concludes that the planned sequence or sluicing activities will serve to further minimize the probability and volume of leaks by keeping liquid away from areas with the greatest potential for leaking. Finally, this report identifies a series of operational responses which when used in conjunction with the recommended sluicing sequence and leak detection methods will minimize worker exposure and environmental safety health risks

  17. HANFORD TANK CLEANUP UPDATE MAY 2009

    International Nuclear Information System (INIS)

    Holloway, J.N.

    2009-01-01

    Retrieval of waste from single-shell tank C-110 resumed in January making it the first waste retrieval operation for WRPS since taking over Hanford's Tank Operations Contract last October. Now, with approximately 90 percent of the waste removed, WRPS believes that modified sluicing has reached the limits of the technology to remove any further waste and is preparing documentation for use in decision making about any future retrieval actions. Tank C-110 is located in C Fann near the center of the Hanford Site. It is a 530,000 gallon tank, built in 1946, and held approximately 126,000 gallons of sludge and other radioactive and chemical waste materials when retrieval resumed. Modified sluicing technology uses liquid waste from a nearby double-shell tank to break up, dissolve and mobilize the solid material so it can be pumped. Because of the variety of waste fon11S, sluicing is often not able to remove all of the waste. The remaining waste will next be sampled for analysis, and results will be used to guide decisions regarding future actions. Work is moving rapidly in preparation to retrieve waste from a second single-shell tank this summer and transfer it to safer double-shell tank storage. Construction activities necessary to retrieve waste from Tank C-104, a 530,000 gallon tank built in 1943, are approximately 60 percent complete as WRPS maintains its focus on reducing the risk posed by Hanford's aging single-shell waste tanks. C-104 is one of Hanford's oldest radioactive and chemical waste storage tanks, containing approximately 263,000 gallons of wet sludge with a top layer that is dry and powdery. This will be the largest sludge volume retrieval ever attempted using modified sluicing technology. Modified sluicing uses high pressure water or liquid radioactive waste sprayed from nozzles above the waste. The liquid dissolves and/or mobilizes the waste so it can be pumped. In addition to other challenges, tank C-104 contains a significant amount of plutonium and

  18. Interim safety equipment list for 241-C-106 waste retrieval, project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1996-01-01

    The purpose of this supporting document is to provide safety classifications for systems, structures, and components of the Tank 241-C-106 Waste Retrieval Sluicing System (WRSS) and to document the methodology used to develop these safety classifications. The WRSS requires two transfer lines, one to carry sluiced waste slurry to tank 241-AY-102 and the other to return supernatant to tank 241-C-106; pumps in each tank; sluicers to direct the supernatant stream inside tank 241-C-106; a slurry distributor in tank 241-AY-102; heating, ventilation, and air conditioning for tank 241-C-106; and instrumentation and control devices

  19. Hanford Site Tank 241-C-108 Residual Waste Contaminant Release Models and Supporting Data

    Energy Technology Data Exchange (ETDEWEB)

    Cantrell, Kirk J.; Krupka, Kenneth M.; Geiszler, Keith N.; Arey, Bruce W.; Schaef, Herbert T.

    2010-06-18

    This report presents the results of laboratory characterization, testing, and analysis for a composite sample (designated 20578) of residual waste collected from single-shell tank C-108 during the waste retrieval process after modified sluicing. These studies were completed to characterize concentration and form of contaminant of interest in the residual waste; assess the leachability of contaminants from the solids; and develop release models for contaminants of interest. Because modified sluicing did not achieve 99% removal of the waste, it is expected that additional retrieval processing will take place. As a result, the sample analyzed here is not expected to represent final retrieval sample.

  20. Interim safety equipment list for 241-C-106 waste retrieval, project W-320

    Energy Technology Data Exchange (ETDEWEB)

    Conner, J.C.

    1996-01-25

    The purpose of this supporting document is to provide safety classifications for systems, structures, and components of the Tank 241-C-106 Waste Retrieval Sluicing System (WRSS) and to document the methodology used to develop these safety classifications. The WRSS requires two transfer lines, one to carry sluiced waste slurry to tank 241-AY-102 and the other to return supernatant to tank 241-C-106; pumps in each tank; sluicers to direct the supernatant stream inside tank 241-C-106; a slurry distributor in tank 241-AY-102; heating, ventilation, and air conditioning for tank 241-C-106; and instrumentation and control devices.

  1. Cold test plan for the Old Hydrofracture Facility tank contents removal project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-11-01

    This Old Hydrofracture Facility (OHF) Tanks Contents Removal Project Cold Test Plan describes the activities to be conducted during the cold test of the OHF sluicing and pumping system at the Tank Technology Cold Test Facility (TTCTF). The TTCTF is located at the Robotics and Process Systems Complex at the Oak Ridge National Laboratory (ORNL). The cold test will demonstrate performance of the pumping and sluicing system, fine-tune operating instructions, and train the personnel in the actual work to be performed. After completion of the cold test a Technical Memorandum will be prepared documenting completion of the cold test, and the equipment will be relocated to the OHF site

  2. Gunite and associated tanks dry well conductivity monitoring report, Oak Ridge National Laboratory, Oak Ridge, Tennessee, February 1998 - December 1998

    International Nuclear Information System (INIS)

    1999-04-01

    A waste removal program is being implemented for the Gunite and Associated Tanks Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee. The waste is being removed by means of remotely operated, in-tank, confined sluicing equipment. During sluicing operations the dry wells adjacent to each of the tanks are instrumented so that potential releases can be detected by means external to the tank. The method of detection is by monitoring the electrical conductivity of the water in the dry well associated with each tank. This report documents the dry well conductivity monitoring data for the period from February 1998 through December 1998. The dry wells monitored during this period include DW-5, DW-6, DW-7, DW-8, DW-9 and DW-10. The conductivity of the water passing through Pump Station 1 (PS1) was also monitored. During this period the sluicing activities at Tank W-6 were initiated and successfully completed. In addition, flight mixers were used to remove wastes from Tank W-5, and sluicing operations were initiated on Tank W-7. Presented in this report are the dry well conductivity, rainfall, tank level, and other appropriate information relevant to the analysis and interpretation of the monitoring data for the reporting period. A thorough analysis of the monitoring results from the six dry wells in the STF and PS1 for the period between February 1998 and December 1998 indicates that no releases have occurred from the gunite tanks being monitored. Overall, the dry well conductivity monitoring continues to provide a robust and sensitive method for detecting potential releases from the gunite tanks and for monitoring seasonal and construction-related changes in the dry well and drain system

  3. EM-50 Tanks Focus Area retrieval process development and enhancements. FY97 technology development summary report

    International Nuclear Information System (INIS)

    Rinker, M.W.; Bamberger, J.A.; Alberts, D.G.

    1997-09-01

    The Retrieval Process Development and Enhancements (RPD and E) activities are part of the US Department of Energy (DOE) EM-50 Tanks Focus Area, Retrieval and Closure program. The purpose of RPD and E is to understand retrieval processes, including emerging and existing technologies, and to gather data on these processes, so that end users have requisite technical bases to make retrieval decisions. Technologies addressed during FY97 include enhancements to sluicing, the use of pulsed air to assist mixing, mixer pumps, innovative mixing techniques, confined sluicing retrieval end effectors, borehole mining, light weight scarification, and testing of Russian-developed retrieval equipment. Furthermore, the Retrieval Analysis Tool was initiated to link retrieval processes with tank waste farms and tank geometric to assist end users by providing a consolidation of data and technical information that can be easily assessed. The main technical accomplishments are summarized under the following headings: Oak Ridge site-gunite and associated tanks treatability study; pulsed air mixing; Oak Ridge site-Old Hydrofracture Facility; hydraulic testbed relocation; cooling coil cleaning end effector; light weight scarifier; innovative tank mixing; advanced design mixer pump; enhanced sluicing; Russian retrieval equipment testing; retrieval data analysis and correlation; simulant development; and retrieval analysis tool (RAT)

  4. Joint optimization scheduling for water conservancy projects in complex river networks

    Directory of Open Access Journals (Sweden)

    Qin Liu

    2017-01-01

    Full Text Available In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks.

  5. Potential of sustainable energy with regard to engineering structures. WINN Energy from Water; Energieverbruik nationaal en regionaal waterbeheer. WINN Energie uit Water

    Energy Technology Data Exchange (ETDEWEB)

    Dahm, R.; Bruggers, M. [Deltares, Delft (Netherlands)

    2009-12-15

    An overview is offered of the annual energy use of pumping stations, weirs and sluices in the Netherlands. This involves both the energy use of wet objects (pumping stations, weirs and sluices) in the main water system and the regional water systems. The reports has an annex containing the report 'Inventarisatie energieverbruik waterwerken' (Inventory of energy use by water works) published by Grontmij Netherlands [Dutch] Een overzicht wordt gegeven van het jaarlijkse energieverbruik door gemalen, stuwen en sluizen in Nederland. Het gaat daarbij zowel om het energieverbruik van de natte objecten (gemalen, stuwen en sluizen) in het hoofdwatersysteem als om de regionale watersystemen. Het rapport bevat als bijlage het rapport 'Inventarisatie energieverbruik waterwerken' door Grontmij Nederland.

  6. High volume tidal or current flow harnessing system

    Energy Technology Data Exchange (ETDEWEB)

    Gorlov, A.M.

    1984-08-07

    Apparatus permitting the utilization of large volumes of water in the harnessing and extracting of a portion of the power generated by the rise and fall of ocean tides, ocean currents, or flowing rivers includes the provision of a dam, and a specialized single cavity chamber of limited size as compared with the water head enclosed by the dam, and an extremely high volume gating system in which all or nearly all of the water between the high and low levels on either side of the dam is cyclically gated through the single chamber from one side of the dam to the other so as to alternately provide positive air pressure and a partial vacuum within the single chamber. In one embodiment, the specialized chamber has a barrier at the bottom which divides the bottom of the chamber in half, large ports at the bottom of the chamber to permit inflow and outflow of high volumes of water, and ganged structures having a higher total area than that of corresponding ports, in which the structures form sluice gates to selectively seal off and open different sets of ports. In another embodiment, a single chamber is used without a barrier. In this embodiment, vertical sluice gates are used which may be activated automatically by pressures acting on the sluice gates as a result of ingested and expelled water.

  7. Project W-320 ALARA Plan

    International Nuclear Information System (INIS)

    Harty, W.M.

    1995-01-01

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials

  8. Project W-320 ALARA Plan

    Energy Technology Data Exchange (ETDEWEB)

    Harty, W.M.

    1995-06-06

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials.

  9. Preliminary safety evaluation for 241-C-106 waste retrieval, project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1994-01-01

    This document presents the Preliminary Safety Evaluation for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). The US DOE has been mandated to develop plans for response to safety issues associated with the waste storage tanks at the Hanford Site, and to report the progress of implementing those plans to Congress. The objectives of Project W-230 are to design, fabricate, develop, test, and operate a new retrieval system capable of removing a minimum of about 75% of the high-heat waste contained in C-106. It is anticipated that sluicing operations can remove enough waste to reduce the remaining radiogenic heat load to levels low enough to resolve the high-heat safety issue as well as allow closure of the tank safety issue

  10. Tanks Focus Area retrieval process development and enhancements FY96 technology development summary report

    International Nuclear Information System (INIS)

    Rinker, M.W.; Bamberger, J.A.; Hatchell, B.K.

    1996-09-01

    The Retrieval Process Development and Enhancements (RPD ampersand E) activities are part of the Retrieval and Closure Program of the U.S. Department of Energy (DOE) EM-50 Tanks Focus Area. The purposes of RPD ampersand E are to understand retrieval processes, including emerging and existing technologies, and to gather data on those processes, so that end users have the requisite technical basis to make retrieval decisions. Work has been initiated to support the need for multiple retrieval technologies across the DOE complex. Technologies addressed during FY96 focused on enhancements to sluicing, borehole mining, confined sluicing retrieval end effectors, the lightweight scarifier, and pulsed air mixing. Furthermore, a decision tool and database have been initiated to link retrieval processes with tank closure to assist end users in making retrieval decisions

  11. Experimental determination of contraction coefficient and velocity ...

    Indian Academy of Sciences (India)

    Jailakshmi Menon

    2018-04-16

    Apr 16, 2018 ... Radial gates are widely used to control the flow in irrigation channels and spillways. Radial gates ... upstream water depth for a vertical sluice gate assuming hydrostatic ... energy loss on the discharge characteristics of vertical.

  12. Waste compatibility assessments to support project W-320

    International Nuclear Information System (INIS)

    BLAAK, T.M.

    1999-01-01

    The intent of this internal memo is to provide a recommendation for the transfer of tank 241-C-106 waste, Attachment 2, to tank 241-AY-102. This internal memo also identifies additional requirements which have been deemed necessary for safely receiving and storing the waste documented in Attachment 2 from tank 241-C-106 in tank 241-AY-102. This waste transfer is planned in support of tank 241-C-106 solids sluicing activities. Approximately 200,000 gallons of waste and flush water are expected to be pumped from tank 241-C-106 into tank 241-AY-102. Several transfers will be necessary to complete the sluicing of tank 241-C-106 solids. To assure ourselves that this waste transfer will not create any compatibility concerns, a waste compatibility assessment adhering to current waste compatibility requirements has been performed

  13. Developing Sensitivity Indicators for Hydraulic Perturbation

    Directory of Open Access Journals (Sweden)

    M.M. Heidari

    2016-02-01

    Full Text Available Introduction: Determination the hydraulic performance of an irrigation network requires adequate knowledge about the sensitivities of the network structures. Hydraulic sensitivity concept of structures and channel reaches aid network operators in identifying structures with higher sensitivities which will attract more attention both during network operation and maintenance program. Sluice gates are frequently used as regulator and delivery structures in irrigation networks. Usually discharge coefficient of sluice gate is considered constant in the design and operation stage. Investigation of sensitivity of offtakes and cross-regulators has carried out by various researchers and some hydraulic sensitivity indicators have been developed. In the previous researches, these indexes were developed based on constant coefficient of discharge for free flow sluice gates. However, the coefficient of discharge for free flow sluice gates depend on gate opening and the upstream water depth. So, in this research, some hydraulic sensitivity indicators at structure based on variable coefficient of discharge for free flow sluice gates were developed and they were validated by using observed data. Materials and Methods: An experimental setup was constructed to analyses the performance of the some hydraulic sensitivity. The flume was provided with storage reservoir, pumps, electromagnetic flowmeter, entrance tank, feeder canal, delivery canals, offtakes, cross-regulators, collector reservoir, piezometric boards. The flume is 60.5 m long and the depth of that is 0.25 m, of which only a small part close to offtake and Cross-regulators was needed for these tests. Offtakes and Cross-regulators are free-flowing sluice gates type. Offtakes were located at distances 20 m and 42.5 m downstream from the entrance tank, respectively. and, Cross-regulators were located 2 m downstream from each offtakes. The offtakes are 0.21 m and Cross-regulators are 0.29 m wide. The upstream

  14. Design and modeling of reservoir operation strategies for sediment management

    NARCIS (Netherlands)

    Sloff, C.J.; Omer, A.Y.A.; Heynert, K.V.; Mohamed, Y.A.

    2015-01-01

    Appropriate operation strategies that allow for sediment flushing and sluicing (sediment routing) can reduce rapid storage losses of (hydropower and water-supply) reservoirs. In this study we have shown, using field observations and computational models, that the efficiency of these operations

  15. Hanford Tanks Initiative fiscal year 1997 retrieval technology demonstrations

    International Nuclear Information System (INIS)

    Berglin, E.J.

    1998-01-01

    The Hanford Tanks Initiative was established in 1996 to address a range of retrieval and closure issues associated with radioactive and hazardous waste stored in Hanford's single shell tanks (SSTs). One of HTI's retrieval goals is to ''Successfully demonstrate technology(s) that provide expanded capabilities beyond past practice sluicing and are extensible to retrieve waste from other SSTS.'' Specifically, HTI is to address ''Alternative technologies to past practice sluicing'' ... that can ... ''successfully remove the hard heel from a sluiced tank or to remove waste from a leaking SST'' (HTI Mission Analysis). During fiscal year 1997, the project contracted with seven commercial vendor teams to demonstrate retrieval technologies using waste simulants. These tests were conducted in two series: three integrated tests (IT) were completed in January 1997, and four more comprehensive Alternative Technology Retrieval Demonstrations (ARTD) were completed in July 1997. The goal of this testing was to address issues to minimize the risk, uncertainties, and ultimately the overall cost of removing waste from the SSTS. Retrieval technologies can be separated into three tracks based on how the tools would be deployed in the tank: globally (e.g., sluicing) or using vehicles or robotic manipulators. Accordingly, the HTI tests included an advanced sluicer (Track 1: global systems), two different vehicles (Track 2: vehicle based systems), and three unique manipulators (Track 3: arm-based systems), each deploying a wide range of dislodging tools and conveyance systems. Each industry team produced a system description as envisioned for actual retrieval and a list of issues that could prevent using the described system; defined the tests to resolve the issues; performed the test; and reported the results, lessons learned, and state of issue resolution. These test reports are cited in this document, listed in the reference section, and summarized in the appendices. This report

  16. Hanford Tanks Initiative fiscal year 1997 retrieval technology demonstrations

    Energy Technology Data Exchange (ETDEWEB)

    Berglin, E.J.

    1998-02-05

    The Hanford Tanks Initiative was established in 1996 to address a range of retrieval and closure issues associated with radioactive and hazardous waste stored in Hanford`s single shell tanks (SSTs). One of HTI`s retrieval goals is to ``Successfully demonstrate technology(s) that provide expanded capabilities beyond past practice sluicing and are extensible to retrieve waste from other SSTS.`` Specifically, HTI is to address ``Alternative technologies to past practice sluicing`` ... that can ... ``successfully remove the hard heel from a sluiced tank or to remove waste from a leaking SST`` (HTI Mission Analysis). During fiscal year 1997, the project contracted with seven commercial vendor teams to demonstrate retrieval technologies using waste simulants. These tests were conducted in two series: three integrated tests (IT) were completed in January 1997, and four more comprehensive Alternative Technology Retrieval Demonstrations (ARTD) were completed in July 1997. The goal of this testing was to address issues to minimize the risk, uncertainties, and ultimately the overall cost of removing waste from the SSTS. Retrieval technologies can be separated into three tracks based on how the tools would be deployed in the tank: globally (e.g., sluicing) or using vehicles or robotic manipulators. Accordingly, the HTI tests included an advanced sluicer (Track 1: global systems), two different vehicles (Track 2: vehicle based systems), and three unique manipulators (Track 3: arm-based systems), each deploying a wide range of dislodging tools and conveyance systems. Each industry team produced a system description as envisioned for actual retrieval and a list of issues that could prevent using the described system; defined the tests to resolve the issues; performed the test; and reported the results, lessons learned, and state of issue resolution. These test reports are cited in this document, listed in the reference section, and summarized in the appendices. This report

  17. Tank 241-C-106 in-tank imaging system operational test report

    International Nuclear Information System (INIS)

    Pedersen, L.T.

    1998-01-01

    This document presents the results of operational testing of the 241-C-106 In-Tank Video Camera Imaging System. This imaging system was installed as a component of Project W-320 to monitor sluicing and waste retrieval activities in Tank 241-C-106

  18. The Innovative Structure Solution for Preventing Salt Intrusion and Retaining Freshwater In Mekong Delta VietNam

    NARCIS (Netherlands)

    Hong, S.T.; Vrijling, J.K.; Stive, M.J.F.

    2013-01-01

    In the Mekong Delta Vietnam, the construction of sluices with the purpose of retaining fresh water and preventing salt water intrusion potentially plays a very important role. However, the structures constructed in small rivers according to local or traditional technology revealed many disadvantages

  19. Mission analysis report for the Hanford Tanks Initiative

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1997-01-01

    This mission analysis report for the Hanford Tanks Initiative (HTI) supports the Hanford Site's Single-Shell Tank (SST) Waste Retrieval Program in its commitment to remove waste from the SSTs for treatment and final closure of the tanks. The results of the HTI will support the US Department of Energy's (DOE) privatization of retrieval efforts. This report addresses the HTI problem statement: Alternative technologies to past practice sluicing (PPS) have not yet been demonstrated to remove the hard heel from a sluiced tank or to remove waste from a leaking SST. Nor have performance-based criteria for cleanout and closure been demonstrated to the degree necessary to validate them as technically and economically achievable. This report also defines the mission statement and mission boundaries; the known interfaces, both programmatic and project; the mission level requirements; the test and evaluation methodology; and measures of success

  20. Research into the Eutrophication of an Artificial Playground Lake near the Yangtze River

    Directory of Open Access Journals (Sweden)

    Min Pang

    2018-03-01

    Full Text Available Water pollution in urban rivers is serious in China. Eutrophication and other issues are prominent. Taking the artificial Playground Lake in Zhenjiang as an example, a numerical model combining particle tracing, hydrodynamics, water quality and eutrophication was constructed to simulate the water quality improvement in Playground Lake with or without water diversion by pump and sluice. Simulation results using particle tracking showed that the water residence time depended on wind direction: east wind, 125 h; southeast wind, 115 h; south wind, 95 h. With no water diversion, the lower the flow velocity of Playground Lake under three wind fields, the more serious the eutrophication. Under pump diversion, the water body in Playground Lake can be entirely replaced by water diversion for 30 h. When the temperature is lower than 15 °C, from 15 °C to 25 °C and higher than 25 °C, the water quality can be maintained for 15 d, 10 d and 7 d, respectively. During high tide periods of spring tides in the Yangtze River from June to August, the water can be diverted into the lake through sluices. The greater the Δh (the water head between the Yangtze River and Playground Lake, the more the water quality will improve. Overall, the good-to-bad order of water quality improvements for Playground Lake is as follows: pumping 30 h > sluice diversion > no water diversion. This article is relevant for the environmental management of the artificial Playground Lake, and similar lakes elsewhere.

  1. Disease prevalence in flounder (Platichthys flesus) from the Dutch Wadden Sea as indicator of environmental quality: A summary of 1988-2005 surveys

    Science.gov (United States)

    Vethaak, A. D.

    2013-09-01

    In 1988, epizootics of ulcer disease in the flatfish flounder in the Dutch Wadden Sea were reported near freshwater drainage sluices of IJsselmeer Lake, locally affecting up to 38.9% of fish. Other diseases such as fin rot and lymphocystis were less frequent, but followed a similar pattern. Results of follow-up surveys in the Wadden Sea in 1994-2005 confirm previous findings and also show significantly elevated ulcer prevalences at other smaller drainage works. The most likely stress factors that contributed to the development of the epizootics at these sites include osmotic stress, adverse water quality conditions including chemical contaminants, nutritional deficiencies, and obstruction to fish migration. It was shown that discharges of IJsselmeer Lake freshwater in 1988-96 had a wide effect on the prevalence and distribution of ulcers and lymphocystis in the western Wadden Sea. A general reduction in disease prevalence in flounder in the entire Dutch Wadden Sea was observed during 1988-2005, which was most likely due to a general improvement in water quality and locally improved habitat conditions for flounder near drainage sluices. Ulcer prevalences outside the two IJsselmeer Lake sluices (Den Oever and Kornwerderzand) declined in this period from approximately 30% to 10% for medium-sized fish. Other skin diseases have also displayed a downward trend at both sites in recent years, with prevalences falling sharply to below 1%. Elsewhere in the Wadden Sea and the Ems-Dollard estuary, disease prevalences have declined towards natural background levels (< 1%). It is concluded that skin diseases, especially ulcers, are useful indicators of environmental quality in the Wadden Sea.

  2. 77 FR 66607 - Northern Wasco County People's Utility District; Notice of Preliminary Permit Application...

    Science.gov (United States)

    2012-11-06

    ... County People's Utility District; Notice of Preliminary Permit Application Accepted for Filing and... County People's Utility District (Northern Wasco) filed an application for a preliminary permit, pursuant...; (2) two five-foot by five-foot sluice gates connecting the new intake channel structure to the...

  3. Engineering study of tank leaks related to hydraulic retrieval of sludge from tank 241-C-106

    International Nuclear Information System (INIS)

    Lowe, S.S.; Carlos, W.C.; Irwin, J.J.; Khaleel, R.; Kline, N.W.; Ludowise, J.D.; Marusich, R.M.; Rittman, P.D.

    1993-01-01

    This study evaluates hydraulic retrieval (sluicing) of the waste in single-shell tank 241-C-106 with respect to the likelihood of tank leaks, gross volumes of potential leaks, and their consequences. A description of hydraulic retrieval is developed to establish a baseline for the study. Leak models are developed based on postulated leak mechanisms to estimate the amount of waste that could potentially leak while sluicing. Transport models describe the movement of the waste constituents in the surrounding soil and groundwater after a leak occurs. Environmental impact and risk associated with tank leaks are evaluated. Transport of leaked material to the groundwater is found to be dependent on the rate of recharge of moisture in the soil for moderate-sized leaks. Providing a cover over the tank and surrounding area would eliminate the recharge. The bulk of any leaked material would remain in the vicinity of the tank for remedial action

  4. Prediction of scour caused by 2D horizontal jets using soft computing techniques

    Directory of Open Access Journals (Sweden)

    Masoud Karbasi

    2017-12-01

    Full Text Available This paper presents application of five soft-computing techniques, artificial neural networks, support vector regression, gene expression programming, grouping method of data handling (GMDH neural network and adaptive-network-based fuzzy inference system, to predict maximum scour hole depth downstream of a sluice gate. The input parameters affecting the scour depth are the sediment size and its gradation, apron length, sluice gate opening, jet Froude number and the tail water depth. Six non-dimensional parameters were achieved to define a functional relationship between the input and output variables. Published data were used from the experimental researches. The results of soft-computing techniques were compared with empirical and regression based equations. The results obtained from the soft-computing techniques are superior to those of empirical and regression based equations. Comparison of soft-computing techniques showed that accuracy of the ANN model is higher than other models (RMSE = 0.869. A new GEP based equation was proposed.

  5. Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam Sluiceway, 2005

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Khan, Fenton; Hedgepeth, J; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.; Skalski, John R.

    2006-06-01

    The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate fish passage at The Dalles Dam powerhouse in 2005. The goal of the study was to provide information on smolt passage that will inform decisions on long-term measures and operations to enhance sluiceway passage and reduce turbine passage to improve smolt survival at the dam. The study addressed one of the main programs dedicated to improving juvenile salmonid survival at The Dalles Dam: Surface Flow Bypass. The study objectives (see below) were met using a combination of hydroacoustic and hydraulic data. The study incorporated fixed-location hydroacoustic methods across the entire powerhouse, with especially intense sampling using multiple split-beam transducers at all sluiceway portals. We did not sample fish passage at the spillway in 2005. In the sluiceway nearfield, we used an acoustic camera to track fish movements. The fish data were interpreted with hydraulic data from a computational fluid dynamics (CFD) model. Fish passage data were collected in the framework of an “experiment” using a randomized block design (3-day treatments; two treatments) to compare two sluiceway operational configurations: Sluice 2+5 and Sluice 2+19 (six gates open for each configuration). Total project outflow was 76% of the 10-year average for spring and 71% of the 10-year average for summer. Based on these findings, we make the following recommendations: 1) The sluice should be operated 24 h/d from April until November. 2) Open six rather than three sluice gates to take advantage of the maximum hydraulic capacity of the sluiceway. 3) Open the three gates above the western-most operating main turbine unit and the three gates at MU 8 where turbine passage rates are relatively high. 4) Operate the turbine units below open sluice gates as a standard fish operations procedure. 5) Develop hydraulic and entrance enhancements to the sluiceway to tap the potential of The

  6. Behavioural interactions between prey (trout smolts) and predators (pike and pikeperch) in an impounded river

    DEFF Research Database (Denmark)

    Jepsen, Niels; Pedersen, Susanne; Thorstad, E.

    2000-01-01

    pikeperch and few female pike have adjusted their behaviour to predation on smolts during the smolt run. The smolt predation in this man-made reservoir is higher than in natural lakes, probably due to the changed physical environment and introduced predators, such as pikeperch. The outlet sluice practice...

  7. Water management strategies against toxic Microcycstis blooms in the Dutch delta

    NARCIS (Netherlands)

    Verspagen, J.M.H.; Passarge, J.; Jöhnk, K.D.; Visser, P.M.; Peperzak, L.; Boers, P.; Laanbroek, H.J.; Huisman, J.

    2006-01-01

    To prevent flooding of the Dutch delta, former estuaries have been impounded by the building of dams and sluices. Some of these water bodies, however, experience major ecological problems. One of the problem areas is the former Volkerak estuary that was turned into a freshwater lake in 1987. From

  8. Water management strategies against toxic Microcystis blooms in the Dutch delta.

    NARCIS (Netherlands)

    Verspagen, J.M.H.; Passarge, J.; Jöhnk, K.; Visser, P.M.; Peperzak, L.; Boers, P.; Laanbroek, H.J.; Huisman, J.

    2006-01-01

    To prevent flooding of the Dutch delta, former estuaries have been impounded by the building of dams and sluices. Some of these water bodies, however, experience major ecological problems. One of the problem areas is the former Volkerak estuary that was turned into a freshwater lake in 1987. From

  9. A Study of the Optimal Planning Model for Reservoir Sustainable Management- A Case Study of Shihmen Reservoir

    Science.gov (United States)

    Chen, Y. Y.; Ho, C. C.; Chang, L. C.

    2017-12-01

    The reservoir management in Taiwan faces lots of challenge. Massive sediment caused by landslide were flushed into reservoir, which will decrease capacity, rise the turbidity, and increase supply risk. Sediment usually accompanies nutrition that will cause eutrophication problem. Moreover, the unevenly distribution of rainfall cause water supply instability. Hence, how to ensure sustainable use of reservoirs has become an important task in reservoir management. The purpose of the study is developing an optimal planning model for reservoir sustainable management to find out an optimal operation rules of reservoir flood control and sediment sluicing. The model applies Genetic Algorithms to combine with the artificial neural network of hydraulic analysis and reservoir sediment movement. The main objective of operation rules in this study is to prevent reservoir outflow caused downstream overflow, minimum the gap between initial and last water level of reservoir, and maximum sluicing sediment efficiency. A case of Shihmen reservoir was used to explore the different between optimal operating rule and the current operation of the reservoir. The results indicate optimal operating rules tended to open desilting tunnel early and extend open duration during flood discharge period. The results also show the sluicing sediment efficiency of optimal operating rule is 36%, 44%, 54% during Typhoon Jangmi, Typhoon Fung-Wong, and Typhoon Sinlaku respectively. The results demonstrate the optimal operation rules do play a role in extending the service life of Shihmen reservoir and protecting the safety of downstream. The study introduces a low cost strategy, alteration of operation reservoir rules, into reservoir sustainable management instead of pump dredger in order to improve the problem of elimination of reservoir sediment and high cost.

  10. Patterns in macrozoobenthic assemblages indicate the state of the environment: insights from the Rhine-Meuse estuary

    NARCIS (Netherlands)

    Wijnhoven, S.; Hummel, H.

    2011-01-01

    During the 1960s and early 1970s, the open system of the Rhine-Meuse estuary with a continuous salinity gradient was converted into a series of stagnant fresh water lakes separated by sluices from the North Sea coastal region ‘Voordelta’. For the last 50 yr, the macrozoobenthic communities have been

  11. Single shell tank sluicing history and failure frequency

    International Nuclear Information System (INIS)

    HERTZEL, J.S.

    1998-01-01

    This document assesses the potential for failure of the single-shell tanks (SSTs) that are presumably sound and helps to establish the retrieval priorities for these and the assumed leakers. Furthermore, this report examines probabilities of SST failure as a function of age and operational history, and provides a simple statistical summary of historical leak volumes, leak rates, and corrosion factor

  12. Development of a waste dislodging and retrieval system for use in the Oak Ridge National Laboratory gunite tank

    International Nuclear Information System (INIS)

    Randolph, J.D.; Lloyd, P.D.; Burks, B.L.

    1997-01-01

    As part of the Gunite And Associated Tanks (GAAT) Treatability Study the Oak Ridge National Laboratory (ORNL) has developed a tank waste retrieval system capable of removing wastes varying from liquids to thick sludges. This system is also capable of scarifying concrete walls and floors. The GAAT Treatability Study is being conducted by the Department of Energy Oak Ridge Environmental Restoration Program. Much of the technology developed for this project was cosponsored by the DOE Office of Science and Technology through the Tanks Focus Area (TFA) and the Robotics Technology Development Program. The waste dislodging and conveyance (WD ampersand C) system was developed jointly by ORNL and participants from the TFA. The WD ampersand C system is comprised of a four degree-of-freedom arm with back driveable motorized joints. a cutting and dislodging tool, a jet pump and hose management system for conveyance of wastes, confined sluicing end-effector, and a control system, and must be used in conjunction with a robotic arm or vehicle. Other papers have been submitted to this conference describing the development and operation of the arm and vehicle positioning systems. This paper will describe the development of the WD ampersand C system and its application for dislodging and conveyance of ORNL sludges from the GAAT tanks. The confined sluicing end-effector relies on medium pressure water jets to dislodge waste that is then pumped by the jet pump through the conveyance system out of the tank. This paper will describe the results of cold testing of the integrated system. At the conference presentation there will also be results from the field deployment. ORNL has completed fabrication of the WD ampersand C system for waste removal and is full-scale testing, including testing of the confined sluicing end-effector

  13. GAAT dry well conductivity monitoring report, July 1997 through January 1998, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-01-01

    A waste removal program is being implemented for the Gunite and Associated Tanks (GAAT) Operable Unit at Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. The waste is being removed by means of remotely operated, in-tank, confined sluicing equipment. The waste removal operations in Tanks W-3 and W-4 in the North Tank Farm (NTF) have been completed and the equipment is being moved to the South Tank Farm (STF), where it will be used to remove the sludges from the six STF tanks (W-5, W-6, W-7, W-8, W-9, and W-10) beginning later this year. During sluicing operations the dry wells adjacent to each of the tanks are instrumented so that potential releases can be detected by means external to the tank. The method of detection is by monitoring the electrical conductivity of the water in the dry well associated with each tank. This report documents the dry well conductivity monitoring data for the period from July 1997 through January 1998. The dry wells monitored during this period include DW-3, DW-4, DW-8, DW-9, and DW-10. The conductivity of the water passing through Pump Station 1 (PS 1) was also monitored. The principal activities that occurred during this period were the sluicing of Tanks W-3 and W-4 in the NTF, transfer of tank liquids from the NTF to the STF, and the installation of new risers, tank dome leveling, and emplacement of stabilized base backfill in the STF. Presented in this report are the dry well conductivity, rainfall, tank level, and STF construction information that is relevant to the analysis and interpretation of the monitoring data for the reporting period. A thorough analysis of the monitoring results for the period indicates that no releases have occurred from the gunite tanks being monitored

  14. Study of the saltwater-freshwater interface with EM-31 and direct measurements

    DEFF Research Database (Denmark)

    Calvache, Carlos Duque; Kinnear, Johnathan; Engesgaard, Peter Knudegaard

    Ringkøbing Fjord, a brackish coastal lagoon system, in the western part of Denmark is an EU ecological habitat, where the salinity and water stage is controlled primarily by the natural inflow from the Skjern River and by the management of a sluice between the fjord and the open sea. So far nobod...

  15. Survey package: Technical and contracting strategies for single-shell tank waste retrieval on the Hanford Site

    International Nuclear Information System (INIS)

    Ramsower, D.C.

    1995-01-01

    Westinghouse Hanford Company is interested in innovative, commercially available or adaptable retrieval system equipment, concepts, and contracting strategies that will ad to existing Hanford Site technology and significantly reduce cost and/or risk from the baseline retrieval approach of sluicing (hydraulically mining) the waste from the SSTs onsite. The objective of this request is to gather information from industry to identify and summarize a suite of retrieval-related components, systems, and contracting approaches. This information will be used to ensure that WHC understands the various waste retrieval alternative approaches, their risks, and their application on the Hanford Site tanks for those occasions when sluicing is not sufficiently effective, appropriate, or cost-effective. An additional objective is to facilitate industry's understanding of the tank and site interface requirements for SST waste retrieval and the complex statutory, legal, regulatory, labor, and other institutional standards being applied to the Hanford Site. This effort will identify and summarize retrieval solutions by the end of September 1996 so that a clear basis for future retrieval program decisions can be established

  16. Remote systems for waste retrieval from the Oak Ridge National Laboratory gunite tanks

    International Nuclear Information System (INIS)

    Falter, D.D.; Babcock, S.M.; Burks, B.L.; Lloyd, P.D.; Randolph, J.D.; Rutenber, J.E.; Van Hoesen, S.D.

    1995-01-01

    As part of a Comprehensive Environmental Response, Compensation, and Liability Act Treatability Study funded by the Department of Energy, the Oak Ridge National Laboratory (ORNL) is preparing to demonstrate and evaluate two approaches for the remote retrieval of wastes in underground storage tanks. This work is being performed to identify the most cost-effective and efficient method of waste removal before full-scale remediation efforts begin in 1998. System requirements are based on the need to dislodge and remove sludge wastes ranging in consistency from broth to compacted clay from Gunite (Shotcrete) tanks that are approaching fifty years in age. Systems to be deployed must enter and exit through the existing 0.6 m (23.5 in.) risers and conduct retrieval operations without damaging the layered concrete walls of the tanks. Goals of this project include evaluation of confined sluicing techniques and successful demonstration of a telerobotic arm-based system for deployment of the sluicing system. As part of a sister project formed on the Old Hydrofracture Facility tanks at ORNL, vehicle-based tank remediation will also be evaluated

  17. First generation long-reach manipulator for retrieval of waste from Hanford single-shell tanks

    International Nuclear Information System (INIS)

    Gibbons, P.W.; McDaniel, L.B.

    1994-10-01

    The US Department of Energy, Richland Operations Office, has established the Tank Waste Remediation System to resolve environmental and safety issues related to underground waste-storage tanks at the Hanford Site. The Tank Waste Remediation System has identified the use of an advanced-technology, long-reach manipulator system as a low-water-addition retrieval alternative to past-practice sluicing

  18. Mixer pump test plan for double-shell tank AZ-101. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Symons, G.A.

    1996-02-01

    Westinghouse Hanford Company has undertaken the task to develop and demonstrate a method of retrieval for double-shell tank waste. Mixer pumps were chosen as the planned method of retrieval for DSTs, based on engineering technology studies, past experience with hydraulic sluicing at the Hanford Site, and experience with mixer pumps at the Westinghouse Savannah River Site.

  19. Mixer pump test plan for double-shell tank AZ-101. Revision 1

    International Nuclear Information System (INIS)

    Symons, G.A.

    1996-02-01

    Westinghouse Hanford Company has undertaken the task to develop and demonstrate a method of retrieval for double-shell tank waste. Mixer pumps were chosen as the planned method of retrieval for DSTs, based on engineering technology studies, past experience with hydraulic sluicing at the Hanford Site, and experience with mixer pumps at the Westinghouse Savannah River Site

  20. 75 FR 40798 - City of Seattle; Notice of Application Ready for Environmental Analysis and Soliciting Comments...

    Science.gov (United States)

    2010-07-14

    ... NGVD; (3) seven 21-foot-high by 17-foot- wide, low-level vertical fixed-wheel sluice gates that provide... of the six turbine-generator units in the power plant; (7) an underground power plant comprised of a 76-feet wide by 172-feet-high by 477-feet-long machine hall; (8) two 204,506-horsepower (hp) Francis...

  1. Radiological and toxicological analyses of tank 241-AY-102 and tank 241-C-106 ventilation systems

    International Nuclear Information System (INIS)

    Himes, D.A.

    1998-01-01

    The high heat content solids contained in Tank 241-C-106 are to be removed and transferred to Tank 241-AY-102 by sluicing operations, to be authorized under project W320. While sluicing operations are underway, the state of these tanks will be transformed from unagitated to agitated. This means that the partition fraction which describes the aerosol content of the head space will increase from IE-10 to IE-8 (see WHC-SD-WM-CN062, Rev. 2 for discussion of partition fractions). The head spare will become much more loaded with suspended material. Furthermore, the nature of this suspended material can change significantly: sluicing could bring up radioactive solids which normally would lay under many meters of liquid supernate. It is assumed that the headspace and filter aerosols in Tank 241-AY-102 are a 90/10 liquid/solid split. It is further assumed that the sluicing line, the headspace in Tank 241-C-106, and the filters on Tank 241-C-106 contain aerosols which are a 67/33 liquid/solid split. The bases of these assumptions are discussed in Section 3.0. These waste compositions (referred to as mitigated compositions) were used in Attachments 1 through 4 to calculate survey meter exposure rates per liter of inventory in the various system components. Three accident scenarios are evaluated: a high temperature event which melts or burns the HEPA filters and causes releases from other system components; an overpressure event which crushes and blows out the HEPA filters and causes releases from other system components; and an unfiltered release of tank headspace air. The initiating event for the high temperature release is a fire caused by a heater malfunction inside the exhaust dust or a fire outside the duct. The initiating event for the overpressure event could be a steam bump which over pressurizes the tank and leads to a blowout of the HEPA filters in the ventilation system. The catastrophic destruction of the HEPA filters would release a fraction of the accumulated

  2. Radiological and toxicological analyses of tank 241-AY-102 and tank 241-C-106 ventilation systems

    Energy Technology Data Exchange (ETDEWEB)

    Himes, D.A.

    1998-08-11

    The high heat content solids contained in Tank 241-C-106 are to be removed and transferred to Tank 241-AY-102 by sluicing operations, to be authorized under project W320. While sluicing operations are underway, the state of these tanks will be transformed from unagitated to agitated. This means that the partition fraction which describes the aerosol content of the head space will increase from IE-10 to IE-8 (see WHC-SD-WM-CN062, Rev. 2 for discussion of partition fractions). The head spare will become much more loaded with suspended material. Furthermore, the nature of this suspended material can change significantly: sluicing could bring up radioactive solids which normally would lay under many meters of liquid supernate. It is assumed that the headspace and filter aerosols in Tank 241-AY-102 are a 90/10 liquid/solid split. It is further assumed that the sluicing line, the headspace in Tank 241-C-106, and the filters on Tank 241-C-106 contain aerosols which are a 67/33 liquid/solid split. The bases of these assumptions are discussed in Section 3.0. These waste compositions (referred to as mitigated compositions) were used in Attachments 1 through 4 to calculate survey meter exposure rates per liter of inventory in the various system components. Three accident scenarios are evaluated: a high temperature event which melts or burns the HEPA filters and causes releases from other system components; an overpressure event which crushes and blows out the HEPA filters and causes releases from other system components; and an unfiltered release of tank headspace air. The initiating event for the high temperature release is a fire caused by a heater malfunction inside the exhaust dust or a fire outside the duct. The initiating event for the overpressure event could be a steam bump which over pressurizes the tank and leads to a blowout of the HEPA filters in the ventilation system. The catastrophic destruction of the HEPA filters would release a fraction of the accumulated

  3. Discussion on Papers 11 - 13

    International Nuclear Information System (INIS)

    Haws, E.; Matthews, M.E.; Wilson, E.M.; Charles-Jones, S.; Allen, R.F.; Young, R.M.; O'Connor, B.

    1992-01-01

    The discussion covered the following topics: the nature of boulder clay for foundations; navigation through the barrage; the construction of sluice caissons; government subsidies for construction costs; the effect of wave action on river banks; allowances for reflected energy in hydrodynamic models; water quality in impounded pools; sediment deposition. Separate abstracts have been prepared for the three papers under discussion. (UK)

  4. Project W-320 Tank 106-C waste retrieval study analysis session report

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the Kaiser Engineers Hanford Company Project W-320 Tank 106-C Waste Retrieval Study Analysis Session Report readily retrievable. This facilitated session was requested by Westinghouse Hanford Company (WHC) to review the characterization data and select the best alternatives for a double-shell receiver tank and for a sluicing medium for Tank 106-C waste retrieval. The team was composed of WHC and Kaiser Engineers Hanford Company (KEH) personnel knowledgeable about tank farm operations, tank 106-C requirements, tank waste characterization and analysis, and chemical processing. This team was assembled to perform a structured decision analysis evaluation and recommend the best alternative-destination double-shell tank between tanks 101-AY and 102-AY, and the best alternative sluicing medium among dilute complexant (DC), dilute noncomplexant (DNC), and water. The session was facilitated by Richard Harrington and Steve Bork of KEH and was conducted at the Bookwalter Winery in Richland from 7:30 a.m. to 4:00 p.m. from July 27 through July 29, 1993. Attachment 1 (Scope Statement Sheet) identifies the team members, scope, objectives, and deliverables for the session

  5. An efficient and not polluting bottom ash extraction system

    International Nuclear Information System (INIS)

    Carrea, A.

    1992-01-01

    This paper reports that boiler waste water effluent must meet more and more tighter requirements to comply with environmental regulations; sluice water resulting from bottom ash handling is one of the main problems in this context, and many utilities are under effort to maximize the reuse of the sluice water, and, if possible, to meet the aim of zero water discharge from bottom ash handling system. At the same time ash reuse efforts gain strength in order to minimize waste production. One solution to these problems can be found in an innovative Bottom Ash Extraction System (MAC System), marked by the peculiarity to be a continuous dry ash removal; the system has been developed in the last four years by MAGALDI INDUSTRIE SRL in collaboration with ANSALDO Ricerche, the R and D department of ANSALDO, the main Italian Boiler Manufacturer, and is now installed in six ENEL Boilers. The elimination of the water as separation element between the bottom part of the furnace and the outside atmosphere gives advantages mainly from the environmental view point, but a certain improvement in the boiler efficiency has also been demonstrated by the application of the system

  6. The Importance of Hydraulic Structures for Society: Quay Walls and Dikes in the Netherlands

    Directory of Open Access Journals (Sweden)

    de Gijt J.G.

    2015-12-01

    Full Text Available Since mankind exists, men have undertaken engineering activities to make their life more pleasant and secure. However this has not been an easy task, especially in the past. The knowledge of mathematics and physics to describe engineering problems became available only since 1400-1500. Nevertheless, great achievements have been made by man before that time, e.g. the pyramids in Egypt, the first sluice in China, the Borobudur temple in Indonesia, and the design and building activities of the Inca’s in South America. To illustrate this development, also the world economy, world ecology will be shortly mentioned. The structures that are briefly discussed in this paper are: soil and concrete dams for generating electricity, reservoirs for irrigation and drinking water, dikes, sluices, inland and sea, tunnels, and quay walls. This paper presents an overview of hydraulic structures in general with the emphasis on quay walls and dikes in the Netherlands. Examples of these structures will be discussed illustrating present state of the art and also with a view to the future. Conclusions and recommendations are given to enhance the knowledge of hydraulic structures.

  7. Repository of not readily available documents for project W-320

    Energy Technology Data Exchange (ETDEWEB)

    Conner, J.C.

    1997-04-18

    The purpose of this document is to provide a readily available source of the technical reports needed for the development of the safety documentation provided for the waste retrieval sluicing system (WRSS), designed to remove the radioactive and chemical sludge from tank 241-C-106, and transport that material to double-shell tank 241-AY-102 via a new, temporary, shielded, encased transfer line.

  8. Repository of not readily available documents for project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1997-01-01

    The purpose of this document is to provide a readily available source of the technical reports needed for the development of the safety documentation provided for the waste retrieval sluicing system (WRSS), designed to remove the radioactive and chemical sludge from tank 241-C-106, and transport that material to double-shell tank 241-AY-102 via a new, temporary, shielded, encased transfer line

  9. Hazardous waste dislodging and conveyance: The confined sluicing method

    International Nuclear Information System (INIS)

    Summers, D.A.; Fossey, R.D.; Mann, M.D.; Blaine, J.G.

    1994-09-01

    This report describes an investigation of a means for dislodging and conveying waste currently stored in underground storage tanks. A series of experiments have been carried out to evaluate the potential of a medium pressure, medium flow rate cutting system as a means of dislodging the waste. It has been found that waterjets at a pressure of 10,000 psi can effectively cut the material which has been chosen to simulate the hardened saltcake within the storage tanks. Based on a parameterization test it has thus been calculated that an inlet flow volume of approximately 30 gallons per minute will be sufficient to excavate 30 gallons per minute of waste from a tank. In order to transport the resulting slurry from the tank, a modified jet pump has been developed and has demonstrated its capability of conveying fluid and waste particles, up to one inch in diameter, to a height of more than 60 feet. Experiments were conducted to examine different configurations to achieve the production levels required for waste removal and to clean the walls of residual material. It was found more effective to clean the walls using an inclined angle of impact rather than a perpendicular angle of impact in order to provide a safeguard against driving the water through any cracks in the containment. It was demonstrated that excavation can take place with almost total immediate extraction of the water and debris from the cutting process. The results have qualitatively shown the potential of a medium pressure waterjet system for achieving the required results for underground storage tank waste retrieval

  10. Discussion on Papers 3 and 4

    International Nuclear Information System (INIS)

    Mitchell, H.; Haigh, G.W.R.; Jenkins, E.

    1992-01-01

    The topics raised in the discussion covered: the accuracy of the cost estimates for the project; the number of sluices to be used; factors controlling the selection of steel or concrete for caisson construction and the design life of the caissons; the type of gates and lock mechanism; shipping traffic forecasts; and the effect of the barrage on port operations. Separate abstracts have been prepared for the two papers under discussion. (UK)

  11. Remedial Investigation Report on Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1. Main Text

    International Nuclear Information System (INIS)

    1994-08-01

    This document is a report on the remedial investigation (RI) of Chestnut Ridge Operable Unit (OU) 2 at the Oak Ridge Y-12 Plant. Chestnut Ridge OU 2 consists of Upper McCoy Branch (UMB), the Filled Coal Ash Pond (FCAP), and the area surrounding the Sluice Channel formerly associated with coal ash disposal in the FCAP. Chestnut Ridge OU 2 is located within the U.S. Department of Energy's (DOE's) Oak Ridge Reservation in Anderson County, Tennessee, approximately 24 miles west of Knoxville. The pond is an 8.5-acre area on the southern slope of Chestnut Ridge, 0.5 mile south of the main Y-12 Plant and geographically separated from the Y-12 Plant by Chestnut Ridge. The elevation of the FCAP is ∼ 950 ft above mean sea level (msl), and it is relatively flat and largely vegetated. Two small ponds are usually present at the northeast and northwest comers of the FCAP. The Sluice Channel Area extends ∼1000 ft from the northern margin of the FCAP to the crest of Chestnut Ridge, which has an elevation of ∼1100 ft above msl. The Sluice Channel Area is largely vegetated also. McCoy Branch runs from the top of Chestnut Ridge across the FCAP into Rogers Quarry and out of the quarry where it runs a short distance into Milton Hill Lake at McCoy Embayment, termed UMB. The portion south of Rogers Quarry, within Chestnut Ridge OU 4, is termed Lower McCoy Branch. The DOE Oak Ridge Y-12 Plant disposed of coal ash from its steam plant operations as a slurry that was discharged into an ash retention impoundment; this impoundment is the FCAP. The FCAP was built in 1955 to serve as a settling basin after coal ash slurried over Chestnut Ridge from the Y-12 Plant. The FCAP was constructed by building an earthen dam across the northern tributary of McCoy Branch. The dam was designed to hold 20 years of Y-12 steam plant ash. By July 1967, ash had filled up the impoundment storage behind the dam to within 4 ft of the top

  12. Remedial Investigation Report on Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1. Main Text

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This document is a report on the remedial investigation (RI) of Chestnut Ridge Operable Unit (OU) 2 at the Oak Ridge Y-12 Plant. Chestnut Ridge OU 2 consists of Upper McCoy Branch (UMB), the Filled Coal Ash Pond (FCAP), and the area surrounding the Sluice Channel formerly associated with coal ash disposal in the FCAP. Chestnut Ridge OU 2 is located within the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation in Anderson County, Tennessee, approximately 24 miles west of Knoxville. The pond is an 8.5-acre area on the southern slope of Chestnut Ridge, 0.5 mile south of the main Y-12 Plant and geographically separated from the Y-12 Plant by Chestnut Ridge. The elevation of the FCAP is {approximately} 950 ft above mean sea level (msl), and it is relatively flat and largely vegetated. Two small ponds are usually present at the northeast and northwest comers of the FCAP. The Sluice Channel Area extends {approximately}1000 ft from the northern margin of the FCAP to the crest of Chestnut Ridge, which has an elevation of {approximately}1100 ft above msl. The Sluice Channel Area is largely vegetated also. McCoy Branch runs from the top of Chestnut Ridge across the FCAP into Rogers Quarry and out of the quarry where it runs a short distance into Milton Hill Lake at McCoy Embayment, termed UMB. The portion south of Rogers Quarry, within Chestnut Ridge OU 4, is termed Lower McCoy Branch. The DOE Oak Ridge Y-12 Plant disposed of coal ash from its steam plant operations as a slurry that was discharged into an ash retention impoundment; this impoundment is the FCAP. The FCAP was built in 1955 to serve as a settling basin after coal ash slurried over Chestnut Ridge from the Y-12 Plant. The FCAP was constructed by building an earthen dam across the northern tributary of McCoy Branch. The dam was designed to hold 20 years of Y-12 steam plant ash. By July 1967, ash had filled up the impoundment storage behind the dam to within 4 ft of the top.

  13. Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam in 2004

    International Nuclear Information System (INIS)

    Johnson, Gary E.; Hanks, Michael E.; Khan, Fenton; Cook, Chris B.; Hedgepeth, J.; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Sargeant, Susan L.; Serkowski, John A.; Skalski, John R.

    2005-01-01

    The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate juvenile salmon passage at The Dalles Dam in 2004 to inform decisions about long-term measures and operations to enhance sluiceway and spill passage and reduce turbine passage to improve smolt survival at the dam. PNNL used fixed-location hydroacoustic sampling across the entire project, especially at the sluiceway and spillway, using multiple split-beam transducers at selected locations. At the sluiceway nearfield, we used an acoustic camera to track fish. The fish data were interpreted and integrated with hydraulic data from a CFD model and in-field ADCP measurements. Two sluiceway operations were compared: West only (SL 1) vs. West+East (SL 1 + SL 18). Based on our findings, we concluded that The Dalles Dam sluiceway has the potential to be highly efficient and effective at passing juvenile salmonids. This potential could be tapped with hydraulic and entrance enhancements to the sluiceway. We recommended the following: (1) six rather than three sluice gates should be opened to take advantage of the maximum hydraulic capacity of the sluiceway. (2) The turbine units below open sluice gates should be operated as a standard fish operations procedure. (3) In 2005, the Corps and fisheries agencies should consider operating sluice gates in one or more of the following combinations of six gates: (a) SL 1-1, 1-2, 1-3 and SL 18-1, 18-2, 18-3 (repeat 2004 operation), (b) SL 1-1, 1-2, 1-3 and SL 11-1, 11-2, 11-3, or (c) SL 1-1, 1-2, 1-3 and SL 2-1, 2-2, 2-3. The following elements for surface flow bypasses which should be considered during design of any sluiceway enhancements at The Dalles Dam: (1) form an extensive surface flow bypass flow net (surface bypass discharge greater than ∼7% of total project discharge), (2) create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration 3 m/s) to entrain the subject juvenile

  14. Project W-320, 241-C-106 sluicing supporting documentation bibliography

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the listing of documentation used to develop, or in support of Project W-320, readily retrievable. All documents are sorted by document number and list the document type. Tank 241-C-106 has been included on the High Heat Load Watch List

  15. Project W-320, 241-C-106 sluicing, master calculation list

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the Master Calculation List readily retrievable. The list gives the status of the calculation (as-built, not used, applied, etc.), the calculation title, its originator, comments, and report number under which it was issued. Tank 241-C-106 has been included on the High Heat Load Watch List

  16. Development of a Distributed Nutrient Sub-Model (NSM Version 1.0) for Watersheds - Kinetic Process Descriptions

    Science.gov (United States)

    2006-11-01

    Broad Crested Weir 0.70 to 0.90 Sharp Crested Weir with Straight Slope Face 1.05 Sharp Crested Weir with Vertical Face 0.80 Sluice Gates with...Reaeration by turbulent flow over a dam Reaeration will occur when water falls over a dam, weir , or other structure in the stream. The amount of reaeration...Goulding. 1995. Phosphorus leaching from soils containing different phosphorus concentrations in the Broad - balk experiment. J. Environ. Qual. 24:904–910

  17. Deterioration of the informal tank institution in Tamil Nadu: caste-based rural society and rapid economic development in India

    OpenAIRE

    JEGADEESAN, Muniandi; FUJITA, Koichi

    2011-01-01

    The informal tank institution seems to have functioned relatively well in Tamil Nadu, India, at least until the early 1970s. The institution had been supported by three layers of irrigation functionaries at village level. Especially important was the role of the lower irrigation functionaries such as the water-turner (Neerkatti), who had been conducting important tasks such as sluice operation, field water management and others. Based on the authors’ recent field survey in seven tank-benefitt...

  18. Engineers on the Twin Rivers: A History of the Nashville District Corps of Engineers United States Army

    Science.gov (United States)

    1978-01-01

    Kentucky, near the present site of Barkley Dam. The schooners Fanny and Maria and Con- cordia were built by James Winchester, William Cage, James Cage...Cumber- land Valley. Many farmers hoped to abandon the uncertain business of farm- ing and get rich by feeding the produc- tive worms. Acres were planted ...frequently attempt to capture the entire plant , careless of any damage inflicted on the lock masonry, lock gates, lever of sluices, &c." To curb this "in

  19. Aylmer Dam : past, present and future; Barrage Aylmer : passe, present et futur

    Energy Technology Data Exchange (ETDEWEB)

    Giguere, H; Lehoux, B; Toma, G [Quebec Ministere du Developpement durable, de l' Environnement et des Parcs, Quebec, PQ (Canada). Centre d' Expertise Hydrique

    2006-07-01

    The Aylmer gravity dam was built in 1953 in Weedon in Quebec's Eastern Townships. The water reservoir retained by the Aylmer Dam has a capacity of 201,928,700 cubic metres and many houses and cottages now line its shores. As such, the water level must be kept high during the summer holiday season. The initial purpose of the dam was for log transportation, the regulation of the Saint-Francois River and the production of electricity. The retention structure belongs to the Quebec government and is managed by the Centre d'Expertise Hydrique du Quebec (CEHQ). Underwater inspection of the dam in 1998 showed signs of erosion damage that required repair. Five of the dam's seven sluices were equipped with stop logs while the others had metallic floodgates. The damage was caused by the preferential use of the 2 floodgates over the years. This paper described the 3 phases for modernizing the evacuation devices of this dam. The first phase began in 2003 with the repair of the dam. The second phase involved the construction of a more modern building in 2004, and the third phase involved the replacement of wooden girders with heated metallic sluices in 2005. The modernization of this dam has reduced the time for required for water evacuation operations during all seasons and has eliminated the danger linked to de-icing techniques. 1 ref., 8 figs.

  20. The Influence of Water Conservancy Projects on River Network Connectivity, A Case of Luanhe River Basin

    Science.gov (United States)

    Li, Z.; Li, C.

    2017-12-01

    Connectivity is one of the most important characteristics of a river, which is derived from the natural water cycle and determine the renewability of river water. The water conservancy project can change the connectivity of natural river networks, and directly threaten the health and stability of the river ecosystem. Based on the method of Dendritic Connectivity Index (DCI), the impacts from sluices and dams on the connectivity of river network are deeply discussed herein. DCI quantitatively evaluate the connectivity of river networks based on the number of water conservancy facilities, the connectivity of fish and geographical location. The results show that the number of water conservancy facilities and their location in the river basin have a great influence on the connectivity of the river network. With the increase of the number of sluices and dams, DCI is decreasing gradually, but its decreasing range is becoming smaller and smaller. The dam located in the middle of the river network cuts the upper and lower parts of the whole river network, and destroys the connectivity of the river network more seriously. Therefore, this method can be widely applied to the comparison of different alternatives during planning of river basins and then provide a reference for the site selection and design of the water conservancy project and facility concerned.

  1. Stimulation of sulfate-reducing activity at salt-saturation in the salterns of Ribandar, Goa, India

    Digital Repository Service at National Institute of Oceanography (India)

    Kerkar, S.; LokaBharathi, P.A.

    salt pan. Each pans is surrounded by ?bandhs? or mud borders on all four sides to prevent siltation and help regulate the flow of water. In the Ribandar saltern, sea water from the Mandovi estuary enters the creek through a sluice gate at high tide... activity (SRA) in marine ecosystems, especially the coastal regions contributes as much as 50% organic carbon turnover (Jorgensen,1982). Sulphate accounts for 70 - 90% of total respiration in salt marsh sediments, where total sediment respiration rates...

  2. Acceptance test report for the Tank 241-C-106 in-tank imaging system

    International Nuclear Information System (INIS)

    Pedersen, L.T.

    1998-01-01

    This document presents the results of Acceptance Testing of the 241-C-106 in-tank video camera imaging system. The purpose of this imaging system is to monitor the Project W-320 sluicing of Tank 241-C-106. The objective of acceptance testing of the 241-C-106 video camera system was to verify that all equipment and components function in accordance with procurement specification requirements and original equipment manufacturer's (OEM) specifications. This document reports the results of the testing

  3. W-320 Department of Health documentation

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    The purpose of this document is to gather information required to show that Project W-320 is in compliance with Washington State Department of Health requirements as specified in Radioactive Air Emissions Notice of Construction Project W-320, Tank 241-C-106 Sluicing, DOE/RL-95-45. Specifically, that W-320 is in compliance with ASME N509-1989 (Nuclear Power Plant Air-Cleaning Units and Components) and ASME N5 10-1989 (Testing of Nuclear Air Treatment Systems) for the 296-C-006 exhaust system

  4. W-320 Department of Health documentation

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-08-07

    The purpose of this document is to gather information required to show that Project W-320 is in compliance with Washington State Department of Health requirements as specified in Radioactive Air Emissions Notice of Construction Project W-320, Tank 241-C-106 Sluicing, DOE/RL-95-45. Specifically, that W-320 is in compliance with ASME N509-1989 (Nuclear Power Plant Air-Cleaning Units and Components) and ASME N5 10-1989 (Testing of Nuclear Air Treatment Systems) for the 296-C-006 exhaust system.

  5. Numerical Analysis of Mixed Fluid Jet Flows through Cutting Fluid Supplying Nozzle

    OpenAIRE

    S, Chung; B, Shin

    2017-01-01

    Metal cutting operation involves generation of heat due to friction between the tool and the cutting materials. This heat needs to be carried away otherwise it creates white spots. To reduce this abnormal heat cutting fluid is used. Cutting fluid also has an important role in the lubrication of the cutting edges of machine tools and the pieces, and in sluicing away the resulting swarf. As a cutting fluid, water is a great conductor of heat but is not stable at high temperatures, so to improve...

  6. Business processes in the RFID-equipped restricted access administrative office

    Directory of Open Access Journals (Sweden)

    Robert Waszkowski

    2016-01-01

    Full Text Available The paper presents business processes in the RFID-equipped restricted access administrative office. The presented diagrams are the result of the analytical work performed by the multidisciplinary team of experts. The team was composed of IT specialist, security systems specialists and employees of the secret office. The presented models include the fact that the facilities in the secret office (cabinet, sluice, photocopier, desks are equipped with the RFID reader, which allows to immediately read the documents that are within their reach.

  7. Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam in 2004

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Hanks, Michael E.; Khan, Fenton; Cook, Chris B.; Hedgepeth, J; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Sargeant, Susan L.; Serkowski, John A.; Skalski, John R.

    2005-06-01

    The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate juvenile salmon passage at The Dalles Dam in 2004 to inform decisions about long-term measures and operations to enhance sluiceway and spill passage and reduce turbine passage to improve smolt survival at the dam. PNNL used fixed-location hydroacoustic sampling across the entire project, especially at the sluiceway and spillway, using multiple split-beam transducers at selected locations. At the sluiceway nearfield, we used an acoustic camera to track fish. The fish data were interpreted and integrated with hydraulic data from a CFD model and in-field ADCP measurements. Two sluiceway operations were compared: West only (SL 1) vs. West+East (SL 1 + SL 18). Based on our findings, we concluded that The Dalles Dam sluiceway has the potential to be highly efficient and effective at passing juvenile salmonids. This potential could be tapped with hydraulic and entrance enhancements to the sluiceway. We recommended the following: (1) six rather than three sluice gates should be opened to take advantage of the maximum hydraulic capacity of the sluiceway. (2) The turbine units below open sluice gates should be operated as a standard fish operations procedure. (3) In 2005, the Corps and fisheries agencies should consider operating sluice gates in one or more of the following combinations of six gates: (a) SL 1-1, 1-2, 1-3 and SL 18-1, 18-2, 18-3 (repeat 2004 operation), (b) SL 1-1, 1-2, 1-3 and SL 11-1, 11-2, 11-3, or (c) SL 1-1, 1-2, 1-3 and SL 2-1, 2-2, 2-3. The following elements for surface flow bypasses which should be considered during design of any sluiceway enhancements at The Dalles Dam: (1) form an extensive surface flow bypass flow net (surface bypass discharge greater than {approx}7% of total project discharge), (2) create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration < 1 m/s/m), (3) make water

  8. Project W-320, 241-C-106 sluicing electrical calculations, Volume 2

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. These calculations are required: To determine the power requirements needed to power electrical heat tracing segments contained within three manufactured insulated tubing assemblies; To verify thermal adequacy of tubing assembly selection by others; To size the heat tracing feeder and branch circuit conductors and conduits; To size protective circuit breaker and fuses; and To accomplish thermal design for two electrical heat tracing segments: One at C-106 tank riser 7 (CCTV) and one at the exhaust hatchway (condensate drain). Contents include: C-Farm electrical heat tracing; Cable ampacity, lighting, conduit fill and voltage drop; and Control circuit sizing and voltage drop analysis for the seismic shutdown system

  9. Project W-320, 241-C-106 sluicing HVAC calculations, Volume 1

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. The report contains the following calculations: Exhaust airflow sizing for Tank 241-C-106; Equipment sizing and selection recirculation fan; Sizing high efficiency mist eliminator; Sizing electric heating coil; Equipment sizing and selection of recirculation condenser; Chiller skid system sizing and selection; High efficiency metal filter shielding input and flushing frequency; and Exhaust skid stack sizing and fan sizing

  10. Project W-320, 241-C-106 sluicing: Piping calculations. Volume 4

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The objective of this calculation is to perform the structural analysis of the Pipe Supports designed for Slurry and Supernate transfer pipe lines in order to meet the requirements of applicable ASME codes. The pipe support design loads are obtained from the piping stress calculations W320-27-I-4 and W320-27-I-5. These loads are the total summation of the gravity, pressure, thermal and seismic loads. Since standard typical designs are used for each type of pipe support such as Y-Stop, Guide and Anchors, each type of support is evaluated for the maximum loads to which this type of supports are subjected. These loads are obtained from the AutoPipe analysis and used to check the structural adequacy of these supports

  11. Project W-320, 241-C-106 sluicing HVAC calculations, Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-07-30

    This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. The report contains the following design calculations: Cooling load in pump pit 241-AY-102; Pressure relief seal loop design; Process building piping stress analysis; Exhaust skid maximum allowable leakage criteria; and Recirculation heat, N509 duct requirements.

  12. Project W-320, 241-C-106 sluicing: Piping calculations. Volume 8

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The objective of this calculation is to perform the hydraulic analysis on the slurry line and the supernate line for W-320. This calculation will use the As-Built conditions of the slurry line and the supernate line. Booster Pump Curves vs System Curves shall be generated for the supernate system and the slurry system

  13. Project W-320, 241-C-106 sluicing piping calculations, Volume 7

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    The object of this report is to calculate the hydraulic forces imposed at the sluicer nozzle. This is required by Project W-320 waste retrieval for tank 241-C-106. The method of analysis used is Bernoulli's momentum equation for stead flow

  14. Project W-320, 241-C-106 sluicing HVAC calculations, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-08-07

    This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. The report contains the following calculations: Exhaust airflow sizing for Tank 241-C-106; Equipment sizing and selection recirculation fan; Sizing high efficiency mist eliminator; Sizing electric heating coil; Equipment sizing and selection of recirculation condenser; Chiller skid system sizing and selection; High efficiency metal filter shielding input and flushing frequency; and Exhaust skid stack sizing and fan sizing.

  15. Project W-320, 241-C-106 sluicing: Piping calculations. Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-07-24

    This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The objective of this calculation is to perform the structural analysis of the Pipe Supports designed for Slurry and Supernate transfer pipe lines in order to meet the requirements of applicable ASME codes. The pipe support design loads are obtained from the piping stress calculations W320-27-I-4 and W320-27-I-5. These loads are the total summation of the gravity, pressure, thermal and seismic loads. Since standard typical designs are used for each type of pipe support such as Y-Stop, Guide and Anchors, each type of support is evaluated for the maximum loads to which this type of supports are subjected. These loads are obtained from the AutoPipe analysis and used to check the structural adequacy of these supports.

  16. New Zealand's Clyde power station

    Energy Technology Data Exchange (ETDEWEB)

    Hatton, J W; Black, J C; Foster, P F

    1987-12-01

    A 100 m-high mass concrete gravity dam, for the generation of 432 MW of power, is under construction at Clyde on the Clutha River in the South Island of New Zealand. A feature of the dam is the provision of a slip joint to allow up to 2 m of movement on the plane of a fault passing through the dam foundation. Details of the dam foundations, seismic design, river channel fault and slip joint, mass concrete, spillway and sluice, powerhouse, and landslide hazard at the site are given. 3 refs.

  17. Data flow between RFID devices in a modern restricted access administrative office

    Directory of Open Access Journals (Sweden)

    Robert Waszkowski

    2016-01-01

    Full Text Available The paper presents models of data flow between RFID devices in a modern restricted access administrative office. The presented diagrams are the result of the analytical work performed by the multidisciplinary team of experts. The team was composed of IT specialist, security systems specialists and employees of the secret office. The presented models include the fact that the facilities in the secret office (cabinet, sluice, photocopier, desks are equipped with the RFID reader, which allows to immediately read the documents that are within their reach.

  18. Monitoring of overalls and personnel skin contamination

    International Nuclear Information System (INIS)

    Turkin, N.F.

    1980-01-01

    Organization of monitoring of overalls and personnel skin contamination wastes is considered. The devices used for this purpose are enumerated. In sanitary sluices through which the personnel leaving the repair zone it is recommended to particularly thoroughly control hand skin contamination and most contaminated parts of overalls (sleeves, breeches lower parts, pockets, stomack region). In sanitary check points during personnel leaving the operator zone monitoring of overalls and skin contamination is performed. The overalls and other individual protective clothing are subjected to control in a special loundry before and after washing (decontamination) [ru

  19. Identification of physical properties for the retrieval data quality objective process

    International Nuclear Information System (INIS)

    Gates, C.M.; Beckette, M.R.

    1995-06-01

    This activity supports the retrieval data quality objective (DQO) process by identifying the material properties that are important to the design, development, and operation of retrieval equipment; the activity also provides justification for characterizing those properties. These properties, which control tank waste behavior during retrieval operations, are also critical to the development of valid physical simulants for designing retrieval equipment. The waste is to be retrieved in a series of four steps. First, a selected retrieval technology breaks up or dislodges the waste into subsequently smaller pieces. Then, the dislodged waste is conveyed out of the tank through the conveyance line. Next, the waste flows into a separator unit that separates the gaseous phase from the liquid and solid phases. Finally, a unit may be present to condition the slurried waste before transporting it to the treatment facility. This document describes the characterization needs for the proposed processes to accomplish waste retrieval. Baseline mobilization technologies include mixer pump technology, sluicing, and high-pressure water-jet cutting. Other processes that are discussed in this document include slurry formation, pneumatic conveyance, and slurry transport. Section 2.0 gives a background of the DQO process and the different retrieval technologies. Section 3.0 provides the mechanistic descriptions and material properties critical to the different technologies and processes. Supplemental information on specific technologies and processes is provided in the appendices. Appendix A contains a preliminary sluicing model, and Appendices B and C cover pneumatic transport and slurry transport, respectively, as prepared for this document. Appendix D contains sample calculations for various equations

  20. Engineering study for ISSTRS design concept

    Energy Technology Data Exchange (ETDEWEB)

    Hertzel, J.S.

    1997-01-31

    Los Alamos Technical Associates, Inc., is pleased to transmit the attached Conceptual Design Package for the Initial Single Shell Tank Retrieval System (ISSTRS), 90% Conceptual Design Review. The package includes the following: (1) ISSTRS Trade Studies: (a) Retrieval Facility Cooling Requirements; (b) Equipment Re-usability between Project W-320 and Tanks 241-C-103 and 241-C-1 05; (c) Sluice Line Options; and (d) Options for the Location of Tanks AX-103 and A-1 02 HVAC Equipment; (2) Drawings; (3) Risk Management Plan; (4) 0850 Interface Control Document; (5) Requirements Traceability Report; and (6) Project Design Specification.

  1. Project W-320 thermal hydraulic model benchmarking and baselining

    International Nuclear Information System (INIS)

    Sathyanarayana, K.

    1998-01-01

    Project W-320 will be retrieving waste from Tank 241-C-106 and transferring the waste to Tank 241-AY-102. Waste in both tanks must be maintained below applicable thermal limits during and following the waste transfer. Thermal hydraulic process control models will be used for process control of the thermal limits. This report documents the process control models and presents a benchmarking of the models with data from Tanks 241-C-106 and 241-AY-102. Revision 1 of this report will provide a baselining of the models in preparation for the initiation of sluicing

  2. Alternate retrieval technology demonstrations program - test report (ARD Environmental, Inc.)

    International Nuclear Information System (INIS)

    Berglin, E.J.

    1997-01-01

    A prototype vehicle, control system, and waste and water scavenging system were designed and fabricated with essentially the full capabilities of the vehicle system proposed by ARD Environmental. A test tank mockup, including riser and decontamination chamber were designed and fabricated, and approximately 830 cubic feet of six varieties of waste simulants poured. The tests were performed by ARD Environmental personnel at its site in Laurel, Maryland, from 4/22/97 through 5/2/97. The capabilities tested were deployment and retrieval, extended mobility and productivity, the ability to operate the system using video viewing only, retrieval after simulated failure, and retrieval and decontamination. Testing commenced with deployment of the vehicle into the tank. Deployment was accomplished using a crane and auxiliary winch to position the vehicle and lower it through the decontamination chamber, into the 36'' diameter x 6' high riser, and touch down on the waste field in the tank. The initial mobility tests were conducted immediately after deployment, prior to sluicing, as the waste field exhibited the greatest amount of variation at this time. This test demonstrated the ability of the vehicle to maneuver over the simulated waste field, and the ability of the operator to work with only video viewing available. In addition, the ability of the vehicle to right itself after being turned on its side was demonstrated. The production rate was evaluated daily through the testing period by measuring the surface and estimating the amount of material removed. The test demonstrated the ability of the vehicle to reduce the waste surface using 400 psi (nominal) water jets, scavenge water and material from the work area, and move to any location, even in the relatively confined space of the 20' diameter test tank. In addition, the ability to sluice to a remote scavenging module was demonstrated. The failure mode test demonstrated the ability to retrieve a stuck vehicle by pulling

  3. Alternate retrieval technology demonstrations program - test report (ARD Environmental, Inc.)

    Energy Technology Data Exchange (ETDEWEB)

    Berglin, E.J.

    1997-07-31

    A prototype vehicle, control system, and waste and water scavenging system were designed and fabricated with essentially the full capabilities of the vehicle system proposed by ARD Environmental. A test tank mockup, including riser and decontamination chamber were designed and fabricated, and approximately 830 cubic feet of six varieties of waste simulants poured. The tests were performed by ARD Environmental personnel at its site in Laurel, Maryland, from 4/22/97 through 5/2/97. The capabilities tested were deployment and retrieval, extended mobility and productivity, the ability to operate the system using video viewing only, retrieval after simulated failure, and retrieval and decontamination. Testing commenced with deployment of the vehicle into the tank. Deployment was accomplished using a crane and auxiliary winch to position the vehicle and lower it through the decontamination chamber, into the 36`` diameter x 6` high riser, and touch down on the waste field in the tank. The initial mobility tests were conducted immediately after deployment, prior to sluicing, as the waste field exhibited the greatest amount of variation at this time. This test demonstrated the ability of the vehicle to maneuver over the simulated waste field, and the ability of the operator to work with only video viewing available. In addition, the ability of the vehicle to right itself after being turned on its side was demonstrated. The production rate was evaluated daily through the testing period by measuring the surface and estimating the amount of material removed. The test demonstrated the ability of the vehicle to reduce the waste surface using 400 psi (nominal) water jets, scavenge water and material from the work area, and move to any location, even in the relatively confined space of the 20` diameter test tank. In addition, the ability to sluice to a remote scavenging module was demonstrated. The failure mode test demonstrated the ability to retrieve a stuck vehicle by pulling

  4. Project W-320, 241-C-106 sluicing: Civil/structural calculations. Volume 6

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-07-24

    This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The purpose of this calculation is to conservatively estimate the weight of equipment and structures being added over Tank 241-C-106 as a result of Project W-320 and combine these weights with the estimated weights of existing structures and equipment as calculated in Attachment 1. The combined weights will be compared to the allowable live load limit to provide a preliminary assessment of loading conditions above Tank 241-C-106.

  5. Project W-320, 241-C-106 sluicing civil/structural calculations, Volume 7

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    The structural skid supporting the Process Building and equipment is designed based on the criteria, codes and standards, referenced in the calculation. The final members and the associated elements satisfy the design requirements of the structure. Revision 1 incorporates vendor data for the weight of the individual equipment components. The updated information does not affect the original conclusion of the calculation, since the overall effect is a reduction in the total weight of the equipment and a nominal relocation of the center of gravity for the skid assembly

  6. Project W-320, 241-C-106 sluicing civil/structural calculations, Volume 7

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-07-24

    The structural skid supporting the Process Building and equipment is designed based on the criteria, codes and standards, referenced in the calculation. The final members and the associated elements satisfy the design requirements of the structure. Revision 1 incorporates vendor data for the weight of the individual equipment components. The updated information does not affect the original conclusion of the calculation, since the overall effect is a reduction in the total weight of the equipment and a nominal relocation of the center of gravity for the skid assembly.

  7. Project W-320, tank 241-C-106 sluicing acceptance for beneficial use

    International Nuclear Information System (INIS)

    BAILEY, J.W.

    1999-01-01

    The purpose of this document is to identify the Project W-320 Chiller Documentation required to be turned over from the Projects Organization to Tank Farm Operations as part of the acceptance of the new equipment for beneficial use

  8. Calculation note: project W-320 primary ventilation air flow requirements for mitigation of steady state flammable gas concentrations in the headspaces of tanks 241-C-106 and 241-AY-102

    International Nuclear Information System (INIS)

    Estey, S.D.

    1997-01-01

    This calculation note analyzes headspace concentrations of hydrogen dependent upon assumed ventilation flow rates provided for tanks 241-C-106 and 241-AY-102. The analyses are based on measured or estimated steady state hydrogen release rates. Tank 241-C-106 is analyzed prior to sluicing; tank 241-AY-102 is analyzed both prior to and after completion of sluicing. Specific analyses, using both best estimated and bounding hydrogen generation rates, include the minimum primary ventilation flow rates required in the tanks to ensure that the steady state hydrogen concentration in the respective tank headspace does not exceed 25% and 100% of the LFL. The headspace hydrogen concentration as a function of time as well as the time required to reach 25% and 100% of LFL upon complete loss of active ventilation, starting from the steady state hydrogen concentration based on a 200 CFM minimum flow rate in tank 241-C-106 and a 100 CFM minimum flow rate in tank241-AY-102. The headspace hydrogen concentration as a function of thee following partial loss of active ventilation (i.e., step changes to l60, l20, 80, and 40 CFM ventilation flow rates) in tank 241-C-106, staffing from a 200 CFM flow rate and the corresponding steady state hydrogen concentration based on the 200 CFM flow rate. The headspace hydrogen concentration as a function of the following partial loss of active ventilation i.e., step changes to 80, 60, 40, and 20 CFM ventilation flow rates) in tank 241-AY-102, starting from a 100 CFM flow rate and the corresponding steady state hydrogen concentration based on the 100 CFM flow rate

  9. Consolidation theory and its applicability to the dewatering and covering of uranium-mill tailings

    International Nuclear Information System (INIS)

    Gates, T.E.

    1982-11-01

    This report is a review and evaluation of soil consolidation theories applicable for evaluating settlement during dewatering and subsequent covering of uranium-mill tailings. Such theories may be used to predict both consolidation and water flow related effects in uranium-mill tailings during drainage, following sluicing into burial pits. A consolidation theory to be useful must consider the effect of time-dependent loads, nonhomogeneous soil mass, nonlinear variation of soil properties with the stress-state parameters, large strain, and saturated and unsaturated flow. Constitutive relations linking the stress-deformation-state variables with void ratio should be adopted for predicting both consolidation and fluid-flow interaction in unsaturated uranium-mill tailings

  10. Flood Disaster Mitigation as Revealed by Cawang-Manggarai River Improvement of Ciliwung River

    Directory of Open Access Journals (Sweden)

    Airlangga Mardjono

    2015-06-01

    The final result of this simulation shows that Scenario 3 gives the lowest water surface elevation profile. Scenario 3 is subjected to river normalization, revetment works along the river, and also flood control structure improvement through the additional sluice gate on Manggarai Barrage. This scenario results 167 cm, 163 cm, 172 cm, 179 cm, 167 cm and 171 cm or 17,60%, 17,16%, 18,09%, 18,76%, 17,38% and 17,72% of maximum water level reduction respectively over cross section number S 20 to S 25, for several simulations with 100 year of design discharge. Keywords: Simulation, river improvement, flood water surface elevation.

  11. Qualification of Raman analysis on Hanford tank waste

    International Nuclear Information System (INIS)

    Crawford, B.A.

    1997-01-01

    Chemical characterization is often required for the Hanford tanks in order to support safety assessments, compatibility between tank contents and operations activities such as sluicing and material transfer. Safety drivers include monitoring of organic chemical and oxidizer levels to better assess indicators that may point to problems from such factors as reactivity of tank contents and flammability from gas generation. Monitoring is also being recognized as a useful in support of operations in tank contents retrieval and storage of material before treatment. Important operations aspects which benefit from additional monitoring and characterization include formation of gels, foaming and fouling of transfer lines during material transfer

  12. Software simulator for property investigation of document management system with RFID tags

    Directory of Open Access Journals (Sweden)

    Kiedrowicz Maciej

    2016-01-01

    Full Text Available The study outlines the method for examining the properties of the RFID-tagged document management system. The system is composed of computers, where the software for supporting processes of the RFID-tagged doc-uments was installed. Furthermore, the system cooperates with many other elements of the secret office (cabinets, sluices, photocopiers, desks. The examination of the properties of the RFID-tagged document management system is, in this case, complex due to the number of a possible examination scenarios. The simulation method for examining the system properties was proposed. It allows to conduct the examination of the properties in a short period of time for numerous testing scenarios.

  13. Sediment problems in reservoirs. Control of sediment deposits

    Energy Technology Data Exchange (ETDEWEB)

    Jacobsen, Tom

    1997-12-31

    When a reservoir is formed on a river, sediment will deposit in the reservoir. Such processes are unfortunate, for instance, for the implementation of hydroelectric energy. This thesis studies the problem of reservoir sedimentation and discusses methods of removing the sediments. Various aspects of reservoir sedimentation are discussed. Anthropogenic impacts seem to greatly affect the erosion processes. Temporal distribution is uneven, mainly because of the very large flood events. A world map showing the Reservoir Capacity: Annual Sediment Inflow ratio for reservoirs with volume equal to 10% of annual inflow has been prepared. The map shows that sedimentation is severe in the western parts of North and South America, eastern, southern and northern Africa, parts of Australia and most of Asia. The development of medium-sized reservoirs is difficult, as they are too large for conventional flushing technique and too small to store the sediment that accumulates during their economic lifetime. A computer model, SSIIM, was used with good results in a case study of two flood drawdown trials in Lake Roxburg, New Zealand. Two techniques have been developed that permits controlled suction of sediment and water into a pipe: the Slotted Pipe Sediment Sluicer (SPSS) and the Saxophone Sediment Sluicer (SSS). The techniques exploit the inflow pattern in through a slot in a pipe. An equation describing this inflow pattern was derived and verified experimentally. The SPSS is fixed near the reservoir bed, and sediment that deposits on top of it is removed in the sluicing process. The SSS sluices sediment from the surface of the sediment deposits. Some technical and economic conditions affecting the economics of sediment removal from reservoirs have been identified and studied. 79 refs., 112 figs., 14 tabs.

  14. Contingency plan for deployment of the void fraction instrument in Tank 241-AY-102

    International Nuclear Information System (INIS)

    CONNER, J.M.

    1999-01-01

    High-heat producing sludge from tank 241-C-106 will be sluiced and transferred to tank 241-AY-102 beginning in October 1998. Safety analyses have postulated that after retrieval, the waste in 241-AY-102 may generate and retain unsafe levels of flammable gases (Noorani 1998, Pasamebmetoglu etal. 1997). Unsafe levels of retained gas are not expected, but cannot be ruled out because of the large uncertainty in the gas generation and retention rates. The Tank Waste Remediation System Basis for Interim Operation (Noorani 1998) identifies the need for a contingency plan to add void fraction monitoring to tank 241-AY-102 within 2 weeks of the identification of flammable gas buildup that would warrant monitoring. The Tank 241-C-106 Waste Retrieval Sluicing System Process Control Plan (Carothers et al. 1998) committed to providing a contingency plan for deployment of the void fraction instrument (VFI) in tank 241-AY-102. The VFI determines the local void fraction of the waste by compressing a waste sample captured in a gas-tight test chamber. The sample chamber is mounted on the end of a 76-cm (2.5-ft) arm that can be rotated from vertical to horizontal when the instrument is deployed. Once in the waste, the arm can be positioned horizontally and rotated to sample in different areas below the riser. The VFI is deployed using a crane. The VFI has been deployed previously in 241-AW, 241-AN, and 241-SY tank farms, most recently in tank 241-SY-101 in June and July 1998. An additional test in tank 241-SY-101 is planned in September 1998. Operating instructions for the VFI are included in the Void Fraction Instrument Operation and Maintenance Manual (Pearce 1994)

  15. Preliminary engineering report waste area grouping 5, Old Hydrofracture Facility Tanks content removal project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-06-01

    The Superfund Amendments and Reauthorization Act of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facilities Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by the U.S. Department of Energy (DOE) Oak Ridge Operations Office, the U.S. Environmental Protection Agency (EPA) Region IV, and the Tennessee Department of Environment and Conservation (TDEC). The effective date of the FFA is January 1, 1992. One objective of the FFA is to ensure that liquid low-level waste (LLLW) tanks that are removed from service are evaluated and remediated through the CERCLA process. Five inactive LLLW tanks, designated T-1, T-2, T-3, T-4, and T-9, located at the Old Hydrofracture (OHF) Facility in the Melton Valley area of Oak Ridge National Laboratory (ORNL) have been evaluated and are now entering the remediation phase. As a precursor to final remediation, this project will remove the current liquid and sludge contents of each of the five tanks (System Requirements Document, Appendix A). It was concluded in the Engineering Evaluation/Cost Analysis [EE/CA] for the Old Hydrofracture Facility Tanks (DOE 1996) that sluicing and pumping the contaminated liquid and sludge from the five OHF tanks was the preferred removal action. Evaluation indicated that this alternative meets the removal action objective and can be effective, implementable, and cost-effective. Sluicing and removing the tank contents was selected because this action uses (1) applicable experience, (2) the latest information about technologies and techniques for removing the wastes from the tanks, and (3) activities that are currently acceptable for storage of transuranic (TRU) mixed waste

  16. Rheological evaluation of simulated neutralized current acid waste

    International Nuclear Information System (INIS)

    Fow, C.L.; McCarthy, D.; Thornton, G.T.

    1986-06-01

    A byproduct of the Purex process is an aqueous waste stream that contains fission products. This waste stream, called current acid waste, is chemically neutralized and stored in double shell tanks on the Hanford Site. This neutralized current acid waste (NCAW) will be transported by pipe to B-Plant, a processing plant on the Hanford Site. Rheological and transport properties of NCAW slurry were evaluated. First, researchers conducted lab rheological evaluations of simulated NCAW. The results of these evaluations were then correlated with classical rheological models and scaled up to predict the performance that is likely to occur in the full-scale system. The NCAW in the tank will either be retrieved as is, i.e., no change in the concentration presently in the tank, or will be slightly concentrated before retrieval. Sluicing may be required to retrieve the solids. Three concentrations of simulated NCAW were evaluated that would simulate the different retrieval options: NCAW in the concentration that is presently in the tank; a slightly concentrated NCAW, called NCAW5.5; and equal parts of NCAW settled solids and water (simulating the sluicing stage), called NCAW1:1. The physical and rheological properties of three samples of each concentration at 25 and 100 0 C were evaluated in the laboratory. The properties displayed by NCAW and NCAW5.5 at 25 and 100 0 C allowed it to be classified as a pseudoplastic non-Newtonian fluid. NCAW1:1 at 25 and 100 0 C displayed properties of a yield-pseudoplastic non-Newtonian fluid. The classical non-Newtonian models for pseudoplastic and yield-pseudoplastic fluids were used with the laboratory data to predict the full-scale pump-pipe network parameters

  17. Assessment of River Habitat Quality in the Hai River Basin, Northern China

    Directory of Open Access Journals (Sweden)

    Yuekui Ding

    2015-09-01

    Full Text Available We applied a river habitat quality (RHQ assessment method to the Hai River Basin (HRB; an important economic centre in China; to obtain baseline information for water quality improvement; river rehabilitation; and watershed management. The results of the assessment showed that the river habitat in the HRB is seriously degraded. Specifically; 42.41% of the sites; accounting for a river length of 3.31 × 104 km; were designated poor and bad. Habitat in the plain areas is seriously deteriorated; and nearly 50% of the sites; accounting for a river length of 1.65 × 104 km; had either poor or bad habitats. River habitat degradation was attributable to the limited width of the riparian zone (≤5 m; lower coverage of riparian vegetation (≤40%; artificial land use patterns (public and industrial land; frequent occurrence of farming on the river banks and high volumes of solid waste (nearly 10 m3; single flow channels; and rare aquatic plants (≤1 category. At the regional scale; intensive artificial land use types caused by urbanization had a significant impact on the RHQ in the HRB. RHQ was significantly and negatively correlated with farmland (r = 1.000; p < 0.01 and urban land (r = 0.998; p < 0.05; and was significantly and positively correlated with grassland and woodland (r = 1.000; p < 0.01. Intensive artificial land use; created through urbanization processes; has led to a loss of the riparian zone and its native vegetation; and has disrupted the lateral connectivity of the rivers. The degradation of the already essentially black rivers is exacerbated by poor longitudinal connectivity (index of connectivity is 2.08–16.56; caused by reservoirs and sluices. For river habitat rehabilitation to be successful; land use patterns need to be changed and reservoirs and sluices will have to be regulated.

  18. Tank 241-A-105 evaporation estimate, 1970 through 1978

    International Nuclear Information System (INIS)

    Allen, G.K.

    1991-09-01

    Tank 241-A-105 was subjected to a severe steam explosion in January 1965 that caused the metal liner on the bottom to bulge upward approximately 8 feet above its concrete foundation. Shortly after this event, radiation was detected in drywells around the tank and it was declared a leaker. Sluicing operations to remove material from the tank began in August 1968 and continued through August 1970. After sluicing was completed, a significant amount of heat generating material still remained in the tank. To keep tank temperatures below operating limits, the water level in the tank was maintained at an approximate depth of 1.5 feet. This practice was continued until January 1979 when it was believed that the contents had decayed sufficiently to discontinue the water addition and put the tank on a portable exhauster system. Recent concern has focused on what portion of this cooling water added to Tank 241-A-105 actually evaporated and how much leaked into the soil during the nine year time period. This report presents the results of a study that estimates the amount of water evaporated from Tank 241-A-105 between 1970 and 1979. The problem was completed in two parts. The first part involved development of a three dimensional heat transfer model which was used to establish the tank heat load. The results of this model were validated against thermocouple data from Tank 241-A-105. The heat removed from the tank by the ventilation air was then used as input to a second computer code, which calculated the water evaporation. Based upon these two models, the amount of water evaporated from Tank 241-A-105, between 1970 and 1979, was between 378,000 and 410,000 gallons. 9 refs., 17 figs., 7 tabs

  19. Simulator for testing hardware and software of the office system with RFID tags

    Directory of Open Access Journals (Sweden)

    Nowicki Tadeusz

    2017-01-01

    Full Text Available This paper presents the method for examining the properties of the RFID-tagged document management system. The system is composed of computers, where the software for supporting processes of the RFID-tagged documents was installed. Furthermore, the system cooperates with many other elements of the office (cabinets, sluices, copiers, try rider, end so one. The examination of the properties of the RFID-tagged document management system is, in this case, complex due to the number of a possible examination scenarios. The simulator method for examining the system properties was design and implemented. It allows to conduct the examination of the properties in a short period of time for numerous testing scenarios.

  20. Radioecological survey of the Belgian upper part of the Meuse river during the triennial low water

    International Nuclear Information System (INIS)

    Van Hees, M.; Hurtgen, Ch.; Verrezen, F.; Bruggeman, M.; Hardeman, F.

    2007-01-01

    Every three years, when the dams on the upper Meuse river are opened to allow heavy maintenance works on the sluices and banks, specific and more extensive sampling campaigns are organised, taking advantage of the low water. This particular situation facilitates sampling and, hence, provides the opportunity to enlarge the sample set and the sampled quantities. This triennial campaign, carried out in September 2004, allowed to confirm the impact of the commissioning of the new units on the Meuse. Upon demand of the Federal Agency for Nuclear Control (FANC), the programme has been modified considerably, as the activity levels observed in previous years (1998 - 2001) proved to be very low in most of the compartments, often even below limits of detection.

  1. Treatability Study Operational Testing Program and Implementation Plan for the Gunite and Associated Tanks at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    To support future decision making of the Gunite and Associated Tanks (GAAT) Operable Unit (OU) remedy selection, the Department of Energy (DOE) is performing a Treatability Study (TS), consistent with the EPA guidance for Comprehensive Environmental Response, compensation, and Liability Act (CERCLA) treatability studies. The study will inform stakeholders about various waste removal technologies and the cost of potential remediation approaches, particularly the cost associated with sluicing and the reduction in risk to human health and the environment from tank content removal. As part of the GAAT OU remedy, a series of studies and technology tests will be preformed. These may address one or more of the following areas, characterization, removal, treatment, and transfer of wastes stored in the GAAT OU

  2. Potential for criticality in Hanford tanks resulting from retrieval of tank waste

    International Nuclear Information System (INIS)

    Whyatt, G.A.; Sterne, R.J.; Mattigod, S.V.

    1996-09-01

    This report assesses the potential during retrieval operations for segregation and concentration of fissile material to result in a criticality. The sluicing retrieval of C-106 sludge to AY-102 and the operation of mixer pumps in SY-102 are examined in some detail. These two tanks (C-106, SY-102) were selected because of the near term plans for retrieval of these tanks and their high plutonium inventories relative to other tanks. Although all underground storage tanks are subcritical by a wide margin if assumed to be uniform in composition, the possibility retrieval operations could preferentially segregate the plutonium and locally concentrate it sufficiently to result in criticality was a concern. This report examines the potential for this segregation to occur

  3. Radioecological survey of the Belgian upper part of the Meuse river during the triennial low water

    Energy Technology Data Exchange (ETDEWEB)

    Van Hees, M.; Hurtgen, Ch.; Verrezen, F.; Bruggeman, M.; Hardeman, F.

    2007-01-15

    Every three years, when the dams on the upper Meuse river are opened to allow heavy maintenance works on the sluices and banks, specific and more extensive sampling campaigns are organised, taking advantage of the low water. This particular situation facilitates sampling and, hence, provides the opportunity to enlarge the sample set and the sampled quantities. This triennial campaign, carried out in September 2004, allowed to confirm the impact of the commissioning of the new units on the Meuse. Upon demand of the Federal Agency for Nuclear Control (FANC), the programme has been modified considerably, as the activity levels observed in previous years (1998 - 2001) proved to be very low in most of the compartments, often even below limits of detection.

  4. Treatability Study Operational Testing Program and Implementation Plan for the Gunite and Associated Tanks at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    To support future decision making of the Gunite and Associated Tanks (GAAT) Operable Unit (OU) remedy selection, the Department of Energy (DOE) is performing a Treatability Study (TS), consistent with the EPA guidance for Comprehensive Environmental Response, compensation, and Liability Act (CERCLA) treatability studies. The study will inform stakeholders about various waste removal technologies and the cost of potential remediation approaches, particularly the cost associated with sluicing and the reduction in risk to human health and the environment from tank content removal. As part of the GAAT OU remedy, a series of studies and technology tests will be preformed. These may address one or more of the following areas, characterization, removal, treatment, and transfer of wastes stored in the GAAT OU.

  5. Phase 2 Sampling Plan for Chestnut Ridge Operable Unit 2 (Filled Coal Ash Pond/Upper McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-08-01

    CDM Federal Programs Corporation (CDM Federal) was contracted by Martin Marietta Energy Systems, Inc. to prepare a Phase H Sampling Plan to describe field investigation work necessary to address regulatory agency review comments on the Remedial Investigation of Filled Coal Ash Pond (FCAP)/Upper McCoy Branch, Chestnut Ridge Operable Unit 2 at the Y-12 Plant, conducted by CH2M Hill in 1990. The scope and approach of the field investigation described in this plan specifically focus on deficiencies noted by the regulators in discussions at the comment resolution meeting of May 8, 1992, in Oak Ridge, Tennessee. This Phase II Sampling Plan includes a field sampling plan, a field and laboratory quality assurance project plan, a health and safety plan, a waste management plan, and appendixes providing an update to applicable or relevant and appropriate requirements for this site and field and laboratory testing methods and procedures. To address deficiencies noted by the regulators, the following activities will be conducted: Background surface soil and surface water/sediment samples will be collected based on statistical considerations for comparison to site data. Existing and new data to be collected will be used to support a human health risk assessment that includes the future homesteader scenario. Biological surveys, samples, and measurements will be collected/conducted to augment existing data and support an ecological risk assessment. Another round of groundwater sampling will be conducted, including on-site wells and the wells on Chestnut Ridge downgradient of the Security Pits. Borings will be completed in the FCAP to collect samples from below the surface depth to describe the chemical characteristics and volume of the ash. The volume of ash associated with sluice channel on Chestnut Ridge will be determined. Soil samples will be corrected below the coal ash in the FCAP and adjacent to sluice channel to evaluate soil contamination and migration of contaminants

  6. Use of the Modified Light Duty Utility Arm to Perform Nuclear Waste Cleanup of Underground Waste Storage Tanks at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Blank, J.A.; Burks, B.L.; DePew, R.E.; Falter, D.D.; Glassell, R.L.; Glover, W.H.; Killough, S.M.; Lloyd, P.D.; Love, L.J.; Randolph, J.D.; Van Hoesen, S.D.; Vesco, D.P.

    1999-01-01

    The Modified Light Duty Utility Arm (MLDUA) is a selectable seven or eight degree-of-freedom robot arm with a 16.5 ft (5.03 m) reach and a payload capacity of 200 lb. (90.72 kg). The utility arm is controlled in either joystick-based telerobotic mode or auto sequence robotics mode. The MLDUA deployment system deploys the utility arm vertically into underground radioactive waste storage tanks located at Oak Ridge National Laboratory. These tanks are constructed of gunite material and consist of two 25 ft (7.62 m) diameter tanks in the North Tank Farm and six 50 ft (15.24 m) diameter tanks in the South Tank Farm. After deployment inside a tank, the utility arm reaches and grasps the confined sluicing end effecter (CSEE) which is attached to the hose management arm (HMA). The utility arm positions the CSEE within the tank to allow the HMA to sluice the tank's liquid and solid waste from the tank. The MLDUA is used to deploy the characterization end effecter (CEE) and gunite scarifying end effecter (GSEE) into the tank. The CEE is used to survey the tank wall's radiation levels and the physical condition of the walls. The GSEE is used to scarify the tank walls with high-pressure water to remove the wall scale buildup and a thin layer of gunite which reduces the radioactive contamination that is embedded into the gunite walls. The MLDUA is also used to support waste sampling and wall core-sampling operations. Other tools that have been developed for use by the MLDUA include a pipe-plugging end effecter, pipe-cutting end effecter, and pipe-cleaning end effecter. Washington University developed advance robotics path control algorithms for use in the tanks. The MLDUA was first deployed in June 1997 and has operated continuously since then. Operational experience in the first four tanks remediated is presented in this paper

  7. Ash dust co-centration in the vicinity of the ash disposal site depending on the size of the pond (“Water Mirror”

    Directory of Open Access Journals (Sweden)

    Zoran Gršić

    2010-09-01

    Full Text Available Thermal power plants Nikola Tesla “A” and “B” are large sources of ash from their ashes/slag deposit sites. Total sizes of ashes/slag depots are 600ha and 382ha, with active cassettes having dimensions ∼200 ha and ∼130 ha. The active cassettes of the disposal sites are covered by rather large waste ponds, the sizes of vary depending on the working condition of a sluice system and on meteorological conditions. Modeling of ash lifting was attempted using results from the dust lifting research. The relation between sizes of ponds and air dust concentration in the vicinity of ash disposal sites was analyzed. As expected, greater sizes of dried disposal site surfaces in combination with stronger winds gave greater dust emission and greater air dust concentration.

  8. Baseline estimate of the retained gas volume in Tank 241-C-106

    International Nuclear Information System (INIS)

    Stewart, C.W.; Chen, G.

    1998-06-01

    This report presents the results of a study of the retained gas volume in Hanford Tank 241-C-106 (C-106) using the barometric pressure effect method. This estimate is required to establish the baseline conditions for sluicing the waste from C-106 into AY-102, scheduled to begin in the fall of 1998. The barometric pressure effect model is described, and the data reduction and detrending techniques are detailed. Based on the response of the waste level to the larger barometric pressure swings that occurred between October 27, 1997, and March 4, 1998, the best estimate and conservative (99% confidence) retained gas volumes in C-106 are 24 scm (840 scf) and 50 scm (1,770 scf), respectively. This is equivalent to average void fractions of 0.025 and 0.053, respectively

  9. Operational test report for the AY-102 Enraf densitometer control and acquisition system

    International Nuclear Information System (INIS)

    Huber, J.H.

    1998-01-01

    On June 2 through June 10, 1998, the AY-102 Tank Densitometer Control and Acquisition System was operationally tested per OTP-320-01 O Revision A-O. The test was performed at the Department of Energy's Hanford Site, 200 East Area, 241-AY Tank Farm. The test validated the functionality of the Enraf 854 ATG Densitometer Gauge and Enraf Control Panel software for use by project W-320, Waste Retrieval Sluicing System (WRSS). The purpose of the test procedure was two fold: (1) to verify the functionality of the Enraf 854 ATG as a Densitometer and (2) to verify the functionality of the Enraf Control Panel Software density acquisition routines. The densitometer was previously acceptance tested per HNF-SD-WM-ATP-077. The software was previously acceptance tested per HNF-1991

  10. Providing Longitudinal Connection In Case Of Cross Sluicing On Water Bodies In Banat Hydrographic Area

    Directory of Open Access Journals (Sweden)

    Hoancă Diana

    2014-10-01

    Full Text Available On Banat Hydrographic Area level, there are a series of works which put hydrological pressures on bodies of water: accumulations, damming, water diversions, regulations, shore protection, etc. These works were created in order to ensure water demand, defend against floods, regulate discharges, and combat humidity excess. Speaking justly, they have an important socioeconomic role. Among the negative effects of longitudinal connection interruption of water bodies we can mention, the risk of not achieving the positive ecological potential of water bodies in accordance with the Water Framework Directive, the reduction of the aquatic biodiversity, the reduction or even extinction of certain aquatic species and the alteration of the flow process. Because the negative effects of the hydromorphological alterations, especially those due to the interruption of the longitudinal connection, have a significant impact on the aquatic biodiversity. At Banat Hydrographic Area level, a series of measures, have been identified for the rehabilitation of the affected water courses: the removal of the hydrotechnical constructions from the water body if they have lost their functional features, building of passages for the migration of the ichthyofauna, reconnecting of the affluents and the disconnected arms as well as other measures intended to bring things back to their natural state. The implementation of these measures is made according to the importance and the extent of their positive impact as opposed to the negative effect that might occur as a consequence of their application. Analyzing the measures aforementioned and taking into consideration the characteristics of the hydromorphological pressures on water bodies in Banat Hydrographic Area, a number of measures regarding control are supplied in this paper.

  11. Hydraulic structures

    CERN Document Server

    Chen, Sheng-Hong

    2015-01-01

    This book discusses in detail the planning, design, construction and management of hydraulic structures, covering dams, spillways, tunnels, cut slopes, sluices, water intake and measuring works, ship locks and lifts, as well as fish ways. Particular attention is paid to considerations concerning the environment, hydrology, geology and materials etc. in the planning and design of hydraulic projects. It also considers the type selection, profile configuration, stress/stability calibration and engineering countermeasures, flood releasing arrangements and scouring protection, operation and maintenance etc. for a variety of specific hydraulic structures. The book is primarily intended for engineers, undergraduate and graduate students in the field of civil and hydraulic engineering who are faced with the challenges of extending our understanding of hydraulic structures ranging from traditional to groundbreaking, as well as designing, constructing and managing safe, durable hydraulic structures that are economical ...

  12. Preventing Buoyant Displacement Gas Release Events in Hanford Double-Shell Waste Tanks

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, Perry A.; Stewart, Charles W.

    2001-01-01

    This report summarizes the predictive methods used to ensure that waste transfer operations in Hanford waste tanks do not create waste configurations that lead to unsafe gas release events. The gas release behavior of the waste in existing double-shell tanks has been well characterized, and the flammable gas safety issues associated with safe storage of waste in the current configuration are being formally resolved. However, waste is also being transferred between double-shell tanks and from single-shell tanks into double-shell tanks by saltwell pumping and sluicing that create new wastes and waste configurations that have not been studied as well. Additionally, planning is underway for various waste transfer scenarios to support waste feed delivery to the proposed vitrification plant. It is critical that such waste transfers do not create waste conditions with the potential for dangerous gas release events.

  13. Cleanout of waste storage tanks at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Weeren, H.O.; Lasher, L.C.; McDaniel, E.W.

    1984-01-01

    In 1943, six storage tanks were built at the Clinton Laboratories [later to become Oak Ridge National Laboratory (ORNL)] to contain wastes generated by wartime research and development operations. During the following years, these tanks became an integral part of the ORNL waste system and accumulated approx. 1.5 x 10 6 L (400,000 gal) of sludge containing radioactive wastes. Recently, over a period of approx. 18 months, these tanks were sluiced, the radioactive sludge resuspended, and the resuspended slurry pumped to the ORNL Hydrofracture Facility for underground disposal. In this paper, a summary of the development work is given, and the process design and constraints are described. The operating difficulties encountered and overcome included grinder blade erosion, malfunctioning instruments, pump suction plugging, and slurry settling. About 90% of the settled sludge (containing approx. 715,000 Ci) was removed from the system

  14. Infrared monitoring of power-plant effluents and heat sinks to optimize plant efficiency

    Science.gov (United States)

    Wurzbach, Richard N.; Seith, David A.

    2000-03-01

    Infrared imaging of the discharge canal and intake pond of the Peach Bottom Atomic Power Station was initiated to confirm a plant staff suspicion that high water intake temperatures were being influenced by recirculation of discharge flow. To minimize the angle of incidence to the water surface, the inspection was made from the top of the cooling towers. Although there was no evidence of recirculation from the plant discharge to the intake pond, two unexpected inputs of thermal energy were discovered during the inspection. A faulty sluice gate and a damaged cross-around pipe could be seen to be dumping thermal energy into the intake pond. The result was increased temperatures at the intake which threatened plant operation, decreased plant efficiency, and resulted in fewer megawatts available to sell to customers during the critical summer months.

  15. Hydroacoustic Evaluation of Overwintering Summer Steelhead Fallback and Kelt Passage at The Dalles Dam, 2009-2010

    Energy Technology Data Exchange (ETDEWEB)

    Khan, Fenton; Johnson, Gary E.; Weiland, Mark A.

    2010-07-31

    This report presents the results of an evaluation of overwintering summer steelhead (Oncorhynchus mykiss) fallback and early out-migrating steelhead kelts downstream passage at The Dalles Dam (TDA) sluiceway and turbines during fall/winter 2009 through early spring 2010. The study was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers, Portland District (USACE). The goal of this study was to characterize adult steelhead spatial and temporal distributions and passage rates at the sluiceway and turbines for fisheries managers and engineers to use in decision-making relative to sluiceway operations. The study was from November 1, 2009 to April 10, 2010. The study was divided into three study periods: Period 1, November 1 - December 15, 2009 for a fall/winter sluiceway and turbine study; Period 2, December 16, 2009 - February 28, 2010 for a turbine only study; Period 3, March 1 - April 10, 2010 for a spring sluiceway and turbine study. Sluiceway operations were scheduled to begin on March 1 for this study; however, because of an oil spill cleanup near the sluice outfall, sluiceway operations were delayed until March 8, 2010, therefore the spring study period did not commence until March 8. The study objectives were to (1) estimate the number and distribution of overwintering summer steelhead fallbacks and kelt-sized acoustic targets passing into the sluiceway and turbines at TDA between November 1 and December 15, 2009 and March 1 and April 10, 2010, and (2) estimate the numbers and distribution of adult steelhead and kelt-sized targets passing into turbine units between December 16, 2009 and February 28, 2010. We obtained fish passage data using fixed-location hydroacoustics. For Period 1, overwintering summer steelhead fallback occurred throughout the 45-day study period. A total of 879 {+-} 165 (95% CI) steelhead targets passed through the powerhouse and sluiceway during November 1 to December 15, 2009. Ninety two

  16. The internal flow pattern analysis of a tidal power turbine operating on bidirectional generation-pumping

    International Nuclear Information System (INIS)

    Luo, Y Y; Xiao, Y X; Wang, Z W

    2013-01-01

    Using tidal energy can reduce environment pollution, save conventional energy and improve energy structure, hence it presents great advantage and is developing potential. Influenced by flood tide and low tide, a fully functional tidal power station needs to experience six operating modes, including bidirectional generation, pumping and sluice; the internal unsteady flow pattern and dynamic characters are very complicated. Based on a bidirectional tidal generator unit, three-dimensional unsteady flows in the flow path were calculated for four typical operating conditions with the pressure pulsation characteristics analyzed. According to the numerical results, the internal flow characteristics in the flow path were discussed. The influence of gravity to the hydraulic performance and flow characteristics were analysed. The results provide a theoretical analysis method of the hydraulic optimization design of the same type unit as well as a direction for stable operation and optimal scheduling of existing tidal power unit

  17. Integral methods for shallow free-surface flows with separation

    DEFF Research Database (Denmark)

    Watanabe, S.; Putkaradze, V.; Bohr, Tomas

    2003-01-01

    eddy and separated flow. Assuming a variable radial velocity profile as in Karman-Pohlhausen's method, we obtain a system of two ordinary differential equations for stationary states that can smoothly go through the jump. Solutions of the system are in good agreement with experiments. For the flow down...... an inclined plane we take a similar approach and derive a simple model in which the velocity profile is not restricted to a parabolic or self-similar form. Two types of solutions with large surface distortions are found: solitary, kink-like propagating fronts, obtained when the flow rate is suddenly changed......, and stationary jumps, obtained, for instance, behind a sluice gate. We then include time dependence in the model to study the stability of these waves. This allows us to distinguish between sub- and supercritical flows by calculating dispersion relations for wavelengths of the order of the width of the layer....

  18. 300 Area Process Trenches Verification Package

    International Nuclear Information System (INIS)

    Lerch, J.A.

    1998-03-01

    The purpose of this verification package is to document achievement of the remedial action objectives for the 300 Area Process Trenches (300 APT) located within the 300-FF-1 Operable Unit (OU). The 300 APT became active in 1975 as a replacement for the North and South Process Pond system that is also part of the 300-FF-1 OU. The trenches received 300 Area process effluent from the uranium fuel fabrication facilities. Waste from the 300 Area laboratories that was determined to be below discharge limits based on monitoring performed at the 307 retention basin was also released to the trenches. Effluent flowed through the headworks sluice gates, down a concrete apron, and into the trenches. From the beginning of operations in 1975 until 1993, a continuous, composite sampler was located at the headwork structure to analyze process effluent at the point of discharge to the environment

  19. Study on measuring social cost of water pollution: concentrated on Han River water system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kwang Im; Min, Dong Gee; Chung, Hoe Seong; Lim, Hyun Jeong; Kim, Mee Sook [Korea Environment Institute, Seoul (Korea)

    1999-12-01

    Following the economic development and the progress of urbanization, the damage on water pollution has been more serious but a social cost caused by water pollution cannot be measured. Although the need of water quality preservation is emphasized, a base material for public investment on enhancing water quality preservation is not equipped yet due to the absence of economic values of water resource. Therefore it measured a cost generated by leaving pollution not treated water quality in this study. To measure the usable value of water resource or the cost of water pollution all over the country should include a national water system, but this study is limited on the mainstream of Han River water system from North Han River through Paldang to Chamsil sluice gates. Further study on Nakdong River and Keum River water systems should be done. 74 refs., 4 figs., 51 tabs.

  20. Man should not let death attain the dominion of his thoughts: An Essay on Subjectivity, Self-Preservation and Immortality

    Directory of Open Access Journals (Sweden)

    Kasper Lysemose

    2010-12-01

    Full Text Available Mortality seems to have no place in the theories on subjectivity in Kant and Husserl. It is suggested that this entente cordiale is an expression of the shared principle at the heart of their philosophy, i.e. the principle of selfpreservation. Self-preservation is a principle that in a certain sense excludes mortality. It is argued that the primary sense of this exclusion is not theoretical but practical. Kant and Husserl are both endorsing the imperative that man should not let death attain the dominion of his thoughts (cf. Mann 1976, 600. The positive correlate to this is to be found in the demand that man should think of himself as if he was immortal. With special regard to Husserl the predicament that accompanies his relentless attempt to fulfill this demand is described as a sluice through which anthropology threatens to flow into the phenomenological enterprise.

  1. Functional testing of a fish sluice, Buchholz small hydro plant - Final report; Funktionskontrolle Fischschleuse, KWKW Buchholz - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Ruhle, Ch. [Buero fuer Jagd- und Fischereifragen, Schmerikon (Switzerland); Scherrer, I. [Entegra Wasserkraft AG, St. Gallen (Switzerland)

    2009-01-15

    Since more than 100 years the diversion hydropower plant of Buchholz at the river Glatt (canton Saint Gall) has been out of operation. With its reactivation as run-of-river scheme, the river meadow, originated due to sedimentation in the former storage basin, with its beaver habitat, could be preserved. For the first time in Switzerland, a fish lock was implemented for the upstream passage way for fish. The fish lock was built directly into for stability reasons newly constructed secondary concrete at the downstream side of the old dam. At the upper lock opening a weir basked is installed, where the migrating fish are recorded. The examination proofed that the fish lock in principle is working for strong swimming fish species (qualitative proof of the performance control). In case of flood caused drift, the migrating fish seem to accept the fish passage. The attempt to quantify the proportion of the migrating willing fish which actually swim through the lock (quantitative proof of the performance control) did not produce satisfactory results. (authors)

  2. Best management practices plan for the Chestnut Ridge-Filled Coal Ash Pond at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-05-01

    The Chestnut Ridge Filled Coal Ash Pond (FCAP) Project has been established to satisfy Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements for the Chestnut Ridge Operable Unit 2. FCAP is on Chestnut Ridge, approximately 0.5 miles south of the Y-12 Plant. A 62-foot high earthen dam across Upper McCoy Branch was constructed in 1955 to create a pond to serve as a settling basin for fly and bottom ashes generated by burning coal at the Y-12 Steam Plant. Ash from the steam was mixed with water to form a slurry and then pumped to the crest of Chestnut Ridge and released through a large pipe to flow across the Sluice Channel area and into the pond. The ash slurry eventually overtopped the dam and flowed along Upper McCoy Branch to Rogers Quarry. The purpose of this document is to provide a site-specific Best Management Practices (BMP) Plan for construction associated with environmental restoration activities at the FCAP Site

  3. Numerical and Experimental Study of Pump Sump Flows

    Directory of Open Access Journals (Sweden)

    Wei-Liang Chuang

    2014-01-01

    Full Text Available The present study analyzes pump sump flows with various discharges and gate submergence. Investigations using a three-dimensional large eddy simulation model and an acoustic Doppler velocimeter are performed. Flow patterns and velocity profiles in the approaching flow are shown to describe the flow features caused by various discharges and gate submergence. The variation of a large-scale spanwise vortex behind a sluice gate is examined and discussed. The suction effect on approaching flow near the pipe column is examined using numerical modeling. To gain more understanding of the vortices variation, a comparison between time-averaged and instantaneous flow patterns is numerically conducted. Additionally, swirl angle, a widely used index for evaluating pump efficiency, is experimentally and numerically examined under various flow conditions. The results indicate that the pump becomes less efficient with increasing discharge and gate submergence. The fluctuation of the free surface over the pump sump is also discussed.

  4. Mechanisms of gas retention and release: Experimental results for Hanford single-shell waste tanks 241-A-101, 241-S-106, and 241-U-103

    International Nuclear Information System (INIS)

    Rassat, S.D.; Caley, S.M.; Bredt, P.R.; Gauglitz, P.A.; Rinehart, D.E.; Forbes, S.V.

    1998-09-01

    The 177 underground waste storage tanks at the Hanford Site contain millions of gallons of radioactive waste resulting from the purification of nuclear materials and related processes. Through various mechanisms, flammable gas mixtures of hydrogen, ammonia, methane, and nitrous oxide are generated and retained in significant quantities within the waste in many (∼25) of these tanks. The potential for large releases of retained gas from these wastes creates a flammability hazard. It is a critical component of the effort to understand the flammability hazard and a primary goal of this laboratory investigation to establish an understanding of the mechanisms of gas retention and release in these wastes. The results of bubble retention experimental studies using waste samples from several waste tanks and a variety of waste types support resolution of the Flammable Gas Safety Issue. Gas bubble retention information gained in the pursuit of safe storage will, in turn, benefit future waste operations including salt-well pumping, waste transfers, and sluicing/retrieval

  5. Initial ACTR retrieval technology evaluation test material recommendations

    International Nuclear Information System (INIS)

    Powell, M.R.

    1996-04-01

    Millions of gallons of radiaoctive waste are contained in underground storage tanks at Hanford (SE Washington). Techniques for retrieving much of this waste from the storage tanks have been developed. Current baseline approach is to use sluice jets for single-shell tanks and mixer pumps for double-shell tanks. The Acquire Commercial Technology for Retrieval (ACTR) effort was initiated to identify potential improvements in or alternatives to the baseline waste retrieval methods. Communications with a variety of vendors are underway to identify improved methods that can be implemented at Hanford with little or no additional development. Commercially available retrieval methods will be evaluated by a combination of testing and system-level cost estimation. Current progress toward developing waste simulants for testing ACTR candidate methods is reported; the simulants are designed to model 4 different types of tank waste. Simulant recipes are given for wet sludge, hardpan/dried sludge,hard saltcake, and soft saltcake. Comparisons of the waste and simulant properties are documented in this report

  6. Test Plan for the Demonstration of Geophysical Techniques for Single-Shell Tank Leak Detection at the Hanford Mock Tank Site: Fiscal Year 2001

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D. Brent; Gee, Glendon W.; Sweeney, Mark D.

    2001-07-31

    As part of the Leak Detection, Monitoring and Mitigation (LDMM) program conducted by CH2M HILL 105-A during FY 2001. These tests are being conducted to assess the applicability of these methods (Electrical Resistance Tomography [ERT], High Resolution Resistivity [HRR], Cross-Borehole Seismography [XBS], Cross-Borehole Radar [XBR], and Cross-Borehole Electromagnetic Induction [CEMI]) to the detection and measurement of Single Shell Tank (SST) leaks into the vadose zone during planned sluicing operations. The testing in FY 2001 will result in the selection of up to two methods for further testing in FY 2002. In parallel with the geophysical tests, a Partitioning Interwell Tracer Test (PITT) study will be conducted simultaneously at the Mock Tank to assess the effectiveness of this technology in detecting and quantifying tank leaks in the vadose zone. Preparatory and background work using Cone Penetrometer methods (CPT) will be conducted at the Mock Tank site and an adjacent test area to derive soil properties for groundtruthing purposes for all methods.

  7. Transport of mecoprop from agricultural soils to an adjacent salt marsh

    International Nuclear Information System (INIS)

    Fletcher, Caroline A.; Scrimshaw, Mark D.; Lester, John N.

    2004-01-01

    Salt marshes are important ecological areas and play a significant role in coastal flood defence schemes. In many areas of the UK they are adjacent to agricultural areas utilised for the growth of cereal crops, for which mecoprop is used as a selective herbicide in the control of broad-leafed weeds. This study measured concentrations of mecoprop in soils, drainage ditch waters and sediments and salt marsh sediments over a period of 138 days following spring application. Soil concentrations of up to 1827 μg/g were recorded after application, which demonstrated a half life for mecoprop of from 9 to 12 days, with first order kinetics. However, a major rainfall event 9 days after application resulted in significant transport of herbicide to the salt marsh via subsurface field drains, drainage ditches and discharge sluice. Mecoprop concentrations of up to 386 μg/l observed in water samples were above UK guidelines

  8. Submerged Fixed Floating Structure under the Action of Surface Current

    Directory of Open Access Journals (Sweden)

    Zhen Cui

    2018-01-01

    Full Text Available The implementation of floating structures has increased with the construction of new sluices for flood control. The overturning moment of floating structure and its influencing factors are the important parameters that determine the structural safety. It is essential to understand the overturning characteristics of these structures in currents. Based on hydrodynamic theory and equilibrium analysis, the hydraulic characteristics of a floating structure are discussed by means of theoretical analysis and experiments. A formula for the overturning moment is developed in terms of the time-averaged pressure on the structure. The corresponding parametric study aims to assess the effects of flow velocities, vertical positions, shape ratios and water levels on the overturning moment. The experimental results show that hydrodynamic factors have a significant influence on the overturning of the structure. Furthermore, a relationship is obtained between the overturning moment and the contributing parameters according to dimensional analysis and the linear fitting method of multidimensional ordinary least squares (OLS. The results predicted by the formula agree with the experimental results, demonstrating the potential for general applicability.

  9. Acceptance test procedure for Project W-049H

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field

  10. Some impacts and mitigations for small hydro developments in Newfoundland and Labrador

    International Nuclear Information System (INIS)

    Buchanan, R.

    1993-01-01

    Potential adverse impacts of small hydro power plants were defined and some of the mitigative techniques that can be used to eliminate or alleviate these impacts were outlined. Potential adverse impacts involved in the construction of hydro projects were identified as those associated with construction of dams, borrow areas, access roads, powerhouses, canals, penstocks, and transmission lines. Fish passage and fish habitat maintenance were also among the major issues that confront most of the proposed small hydro projects in Newfoundland. Fish passage and habitat issues received particular attention in view of their obvious importance in a province where fishing is a way of life for large segments of the population. Major challenges included both upstream and downstream fish passage, and maintenance flows downstream of dams. Upstream migration could be facilitated by fishways. Downstream migration of Atlantic salmon smolts was said to be more problematic, but could be addressed by strategies such as intake design, screens, bypasses, sluices, turbine selection, plant shutdowns at critical times and operation of turbines at peak efficiencies. 12 refs., 2 tabs

  11. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  12. Low head hydro market assessment : main report : vol. 1

    International Nuclear Information System (INIS)

    2008-03-01

    Hydroelectric power is a predictable renewable energy source that produces no greenhouse gases (GHGs) and has low maintenance costs. In addition to river resources, low head hydro is available in sluice gates, irrigation canals, drinking water pressure release valves, and municipal wastewater outfalls. Canada's potential for low head hydro has been estimated at 5000 MW at 2000 different sites across the country. Sites of up to 50 MW have been identified in Ontario and Manitoba. This study performed a market assessment on low head hydro developments. Available and emerging technologies for developing low head hydro were identified. The economics of low head hydro in Canada were explored, and barriers to low head hydro development were identified. Strategies to promote low head hydro development were also explored, and the impact of different incentive types on the low head hydropower market were estimated using a simple economic model. It was concluded that a reduced, streamlined, and standardized environmental assessment process will significantly benefit low head hydro development in Canada. 5 refs., 14 tabs., 17 figs

  13. An Environmental Innovation: The Sewer Mouse

    Science.gov (United States)

    1979-01-01

    In the effort to clean up America's waters, there is a little-known complicating factor: because they leak, sewer systems in many American cities are causing rather than preventing pollution of rivers and lakes. Fixing the leaks is difficult because their locations are unknown. Maintenance crews can't tear up a whole city looking for cracks in the pipes; they must first determine which areas are most likely suspects. An aerospace spinoff is providing help in that regard. The problem starts with heavy rains. Rainwater naturally flows into the sewers from streets, but sewage systems are designed to accommodate it. However, they are not designed to handle the additional flow of "groundwater", rain absorbed by the earth which seeps into the sewers through leaks in pipes and sewer walls. After a storm, groundwater seepage can increase the waterflow to deluge proportions, with the result that sewage treatment plants are incapable of processing the swollen flow. When that happens the sluices must be opened, dumping raw sewage into rivers and lakes.

  14. Methodology of Dynamic Monitoring of Structures in the Vicinity of Hydrotechnical Works - Selected Case Studies

    Science.gov (United States)

    Wyjadłowski, Marek

    2017-12-01

    The constant development of geotechnical technologies imposes the necessity of monitoring techniques to provide a proper quality and the safe execution of geotechnical works. Several monitoring methods enable the preliminary design of work process and current control of hydrotechnical works (pile driving, sheet piling, ground improvement methods). Wave parameter measurements and/or continuous histogram recording of shocks and vibrations and its dynamic impact on engineering structures in the close vicinity of the building site enable the modification of the technology parameters, such as vibrator frequency or hammer drop height. Many examples of practical applications have already been published and provide a basis for the formulation of guidelines, for work on the following sites. In the current work the author's experience gained during sheet piling works for the reconstruction of City Channel in Wrocław (Poland) was presented. The examples chosen describe ways of proceedings in the case of new and old residential buildings where the concrete or masonry walls were exposed to vibrations and in the case of the hydrotechnical structures (sluices, bridges).

  15. Optimization of the monitoring of liquid discharges from the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Ivanovova, Diana; Hanslik, Eduard

    2009-01-01

    The main goals of the project included (i) examination of the kinetics of wastewater transport from the Temelin NPP to the watercourse (Vltava river) and the kinetics of the contaminants in the watercourse, considering normal monitoring conditions and radiological emergency situations, and (ii) prediction of the transport of contaminants, in particular profiles downstream of the points of wastewater discharge from the plant. Wastewater flow velocity within the NPP and in the Vltava river segment between the Korensko Dam (wastewater release) and Hladna profiles was studied. Tritium that is normally released with wastewater served as the tracer. The results indicated how the tritium flow time patterns depend on the flow rate of the watercourse and on the pathway through which the wastewater is discharged (via the hydroelectric installation at the Korensko Dam, to the weir sluices, and directly to the watercourse). The tritium balance in the wastewater and in the Vltava river was calculated and compared to the released activity data provided by the Temelin plant operator (CEZ Group utility). (orig.)

  16. Dlja kompanii "Bega" ne nuzhen shljus v Jevrosojuz! = BEGA does not need any sluice to the EU / Aloizas Kuzmarskis

    Index Scriptorium Estoniae

    Kuzmarskis, Aloizas

    2004-01-01

    Leedu stividorettevõtte "Bega" juht Aloizas Kuzmarskis ettevõtte asutamisest, terminali ehitamisest koostöös Klaipeda meresadamaga, kaupade lastimise mahtudest, kvaliteedisertifikaatide omandamisest ja Euroopa Liiduga liitumise mõjudest sadamateenustele

  17. Development and Deployment of the Extended Reach Sluicing System (ERSS) for Retrieval of Hanford Single Shell Tank Waste. Draft

    International Nuclear Information System (INIS)

    Bauer, Roger E.; Figley, Reed R.; Innes, A. G.

    2013-01-01

    A history of the evolution and the design development of Extended Reach Sluicer System (ERSS) is presented. Several challenges are described that had to be overcome to create a machine that went beyond the capabilities of prior generation sluicers to mobilize waste in Single Shell Tanks for pumping into Double Shell Tank receiver tanks. Off-the-shelf technology and traditional hydraulic fluid power systems were combined with the custom-engineered components to create the additional functionality of the ERSS, while still enabling it to fit within very tight entry envelope into the SST. Problems and challenges inevitably were encountered and overcome in ways that enhance the state of the art of fluid power applications in such constrained environments. Future enhancements to the ERSS design are explored for retrieval of tanks with different dimensions and internal obstacles

  18. TANK FARM RETRIEVAL LESSONS LEARNED AT THE HANFORD SITE

    International Nuclear Information System (INIS)

    DODD RA

    2008-01-01

    exception to the waste retrieval criteria for a specific tank. Tank waste retrieval has been conducted at the Hanford Site over the last few decades using a method referred to as Past Practice Hydraulic Sluicing. Past Practice Hydraulic Sluicing employs large volumes of DST supernatant and water to dislodge, dissolve, mobilize, and retrieve tank waste. Concern over the leak integrity of SSTs resulted in the need for tank waste retrieval methods capable of using smaller volumes of liquid in a more controlled manner

  19. More hydroelectric power, less flooding

    International Nuclear Information System (INIS)

    Ryvik, Hugo

    2002-01-01

    The article describes how the water flow in two large Norwegian waterfalls are controlled in a new way to give better control over the water masses, more energy and less violation of environmental requirements. The new control method was developed by Prediktor AS. Rather than modelling precipitation and snow melting, Prediktor AS have constructed a simple yet efficient solution. The water flow approaches a setpoint with a given oscillation frequency, and a new opening of the discharge valve or the sluice gate is calculated. After half an hour, or one hour, the calculation is repeated using new flow measurements in the waterfall, and the result is a new opening of the valve. Limits are inserted for maximum and minimum openings and for how fast the valves are allowed to open or close. The system is fully automatic and requires only little follow-up by the operating personnel. Regulating the flow from a water magazine to a waterfall many kilometres downstream is no easy task, in particular when the unregulated inflow in the residual field between the outlet point and the control point varies a lot

  20. Stream remediation following a gasoline spill

    International Nuclear Information System (INIS)

    Owens, E.H.; Reiter, G.A.; Challenger, G.

    2000-01-01

    On June 10, 1999, a pipe ruptured on the Olympic Pipe Line causing the release, explosion and fire of up to one million litres of gasoline in Bellingham, Washington. It affected approximately 5 km of the Whatcom Creek ecosystem. Following the incident, several concurrent activities in the source area and downstream occurred. This paper discussed the remediation of the affected stream bed sections. During the period July 6 - August 16, an interagency project was implemented. It involved mechanical, manual, and hydraulic in-situ treatment techniques to remove the gasoline from the stream bed and the banks. In addition, a series of controlled, hydraulic flushes were conducted. The sluice or control gates at the head of the Whatcom Creek were opened each night, and bigger flushes took place before and after the treatments. Simultaneously, water and sediment were sampled and analysed. The data obtained provided information on the state of the initial stream water and stream sediment and on the effects that the remediation had had. The residual gasoline was successfully removed from the sediments and river banks in six weeks. No downstream movement of the released gasoline towards Bellingham was detected. 3 refs., 2 tabs., 11 figs

  1. Interconnected ponds operation for flood hazard distribution

    Science.gov (United States)

    Putra, S. S.; Ridwan, B. W.

    2016-05-01

    The climatic anomaly, which comes with extreme rainfall, will increase the flood hazard in an area within a short period of time. The river capacity in discharging the flood is not continuous along the river stretch and sensitive to the flood peak. This paper contains the alternatives on how to locate the flood retention pond that are physically feasible to reduce the flood peak. The flood ponds were designed based on flood curve number criteria (TR-55, USDA) with the aim of rapid flood peak capturing and gradual flood retuning back to the river. As a case study, the hydrologic condition of upper Ciliwung river basin with several presumed flood pond locations was conceptually designed. A fundamental tank model that reproducing the operation of interconnected ponds was elaborated to achieve the designed flood discharge that will flows to the downstream area. The flood hazard distribution status, as the model performance criteria, will be computed within Ciliwung river reach in Manggarai Sluice Gate spot. The predicted hazard reduction with the operation of the interconnected retention area result had been bench marked with the normal flow condition.

  2. Oil slick skimmer

    International Nuclear Information System (INIS)

    Karterman, D.S.

    1993-01-01

    A craft for removing an oil slick from a body of water is described comprising: a pair of spacedly arranged paralleled positioned elongated floats, a platform mounted on and extending between said floats, a weir mounted on said platform between said floats and being movable independently and substantially vertical of the longitudinal axis of said floats to a position below the surface of said body of water, a submersible oil receiving and storage means detachedly mounted to said platform between said floats and having an inlet port at one level and comprising a substantially enclosed oil accumulator having an outlet port at a lower level, said weir comprising a sluice gate constructed and arranged to admit into said inlet port of said oil receiving and storage means under the effects of gravity a portion of an oil stick comprising a water and oil mixture skimmed from said body of water, and a first pump connected to said outlet port of said accumulator to control the movement of water from the inside lower level of said accumulator out of said accumulator to thereby control the amount of the oil slick flowing into said accumulator

  3. The utilization of water courses for the production of electric power. Report from a working group

    International Nuclear Information System (INIS)

    1992-01-01

    The problems connected with damming Danish water courses to enable the production of hydroelectricity are discussed. These constraints are generally related to conservation principles and cultural historical interests. It is observed that attempts are usually made to remove dams constructed in water courses such as streams and brooks, in order to ensure the free passage of fish and small animals and it is the opinion of the working group that this policy should continue to be followed. Otherwise alternative methods (such as fish staircases and fish sluices) should be set up to enable the fish to pass through without getting entangled with any turbines. Consideration must be given to the preservation of items of cultural-historical interest. Where waters are stagnant, at least half of the water volume should be left untouched for fish passage, and in other non-stagnant water areas water should be reserved for fish passage. The amount of necessary water volume should be assessed in individual cases. The local authorities have agreed that legislation on dams, the establishment of fauna and fish passages and the dedication of free waters to fish passage should be coordinated. (AB)

  4. Emerging drugs for sickle cell anemia.

    Science.gov (United States)

    Singh, Priya C; Ballas, Samir K

    2015-03-01

    The search for effective therapeutic interventions for sickle cell disease (SCD) has been an ongoing endeavor for over 50 years. During this period, only hydroxyurea (HU), which received US FDA approval in February 1998, was identified as an effective therapeutic agent in preventing or ameliorating the frequency of vaso-occlusive crises, acute chest syndrome and the need for blood transfusion. Approximately 25% of patients with sickle cell anemia (SCA), however, do not respond to HU and some patients experiencing serious side effects of this chemotherapeutic agent. Nevertheless, the success of HU opened the sluice gates to identify other effective drug therapies. The objective of this review is to describe the emerging drug therapies for SCA. In this review, we describe the pathophysiology of SCD and provide an in-depth analysis of the current and new pharmacologic therapies in the field. Literature searches involved multiple databases including Medline In-Process & Other Non-Indexed Citations, MEDLINE, Embase, Cochrane Database of Systematic Reviews, and Scopus. SCA is a heterogeneous disease that has caused tremendous global morbidity and early mortality. More effective, individualized and inexpensive therapies are needed. New therapies targeting multiple pathways in its complex pathophysiology are under investigation.

  5. Characteristics of Sanxikou Water-retaining Hydropower Station and Its Application of New Technology%三溪口河床式水电站工程特点与新技术应用

    Institute of Scientific and Technical Information of China (English)

    赖勇; 黄荣卫; 张永进

    2014-01-01

    针对三溪口河床式水电站工程过闸流量大、基础为深厚强透水砂砾卵石,防渗及防冲问题突出的特点,泄洪闸底板表面考虑抗冲耐磨要求设置聚丙烯纤维混凝土面层,防冲槽局部以抛石混凝土技术进行加固;枢纽右岸地势低,防渗系统封闭困难,利用枢纽右岸上游330国道路堤兼作挡水溢流坝,并在路堤迎水坡脚设置悬挂式防渗墙,连接上游山体与闸前垂直式防渗墙构建防渗系统;枢纽交通桥兼作左右岸外部交通连接线,基础承载力要求高,根据泄洪闸结构特点及河床地质条件,以泄洪闸底板作为筏型基础,低压注浆技术在渗流状态下强透水地基中被成功运用。%Sanxikou hydropower station is a water-retaining station with large flow ,it is located on the foundation of thick permeable gravel pebbles ,which causes the problem of seepage and erosion .Regarding to these problems ,FRC(fiber re-inforced concrete) was used on the floor of the gate and RFC(rocked-filled concrete) was used in anti-scour channel for energy dissipation and erosion control .The embankment of State Road 330 located at the right bank of the upstream was served as water-retaining and overfall dam ,due to the low-lying right bank of the river which made it hard to seal the an-ti-seepage system .In addition ,Suspended cut-off wall was constructed at the heel of the riverside slope to connect the anti-seepage system between the upstream mountain and the vertical cut-off wall in front of the gate .The traffic bridge as the connecting media between the left and right bank ,the bearing capacity of its foundation was set high .According to the structural characteristics and the geological condition of the sluice ,the floor of the sluice was used as raft foundation and low pressure grouting method in sandy gravels were applied on strong permeable foundation successfully in the state of seepage .

  6. Estruturas automáticas para controle de água nos canais em lavoura de arroz irrigado Automatic structures for water control in channels on irrigated rice crops

    Directory of Open Access Journals (Sweden)

    Luís G. H. do Amaral

    2005-04-01

    Full Text Available O Rio Grande do Sul apresenta a maior área irrigada do Brasil, devido principalmente à lavoura de arroz irrigado por inundação. Um dos fatores que contribuem para reduzir a eficiência de irrigação nessas lavouras é o baixo grau de controle exercido pelas estruturas de distribuição de água. Os objetivos deste trabalho foram projetar e construir dois protótipos de estruturas hidráulicas para controle automático de vazão em canais de irrigação e comparar sua sensibilidade de controle de vazão com a sensibilidade de duas comportas fixas. Os protótipos construídos - uma comporta hidromecânica automática e um regulador automático de vazão - foram instalados à entrada de um canal secundário, juntamente com uma comporta-gaveta e uma comporta-vertedor, que são as estruturas mais utilizadas para controle de vazão no RS. Provocou-se uma variação de 0,20 m na altura da lâmina de água a montante, determinando-se a vazão em cada estrutura. A menor variação de vazão com a alteração da lâmina foi de 5,6%, obtida com o regulador automático de vazão, seguido da comporta-gaveta com 23,7%, da comporta hidromecânica com 30,5%, e da comporta vertedor com 1.177,2%.In Brazil, the State that presents the largest extension of irrigated lands is Rio Grande do Sul, mainly due to rice that grows under flooded conditions. One of the factors that contribute to decrease the efficiency of irrigation is the low degree of control obtained with the structures used on water distribution. The objectives of this work were to design and build two hydraulic structures for automatic flow control on irrigation channels, and to compare the flow control sensitivity of the built prototypes with two types of gates that are widely used in the rice fields at the Rio Grande do Sul State. The constructed prototypes - a hydro-mechanical gate and an automatic flow regulator - were installed at the entrance of a secondary channel, next to a sluice gate and

  7. Sampling and Analysis Plan for the Gunite and Associated Tanks Treatability Study, wall coring and scraping in Tanks W-3 and W-4 (North Tank Farm), Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-08-01

    This plan documents the procedures for collecting and analyzing wall core and wall scraping samples from Tanks W-3 and W-4 in the North Tank Farm. This is in support of the Comprehensive Environmental Response, Compensation, and Liability Act Treatability Study of the Gunite and Associated Tanks at ORNL. The sampling and analysis will be in concert with sludge retrieval and sluicing of the tanks. Wall scraping and wall core samples will be collected from each quadrant in each tank by using a scraping sampler and a coring drill deployed by the Houdini robot vehicle. Each sample will be labeled, transported to the Radioactive Materials Analytical Laboratory and analyzed for physical/radiological characteristics, including total activity, gross alpha, gross beta, radioactive Sr + Cs, and other alpha and gamma emitting radionuclides. The Data Quality Objectives process, based on US EPA guidance (EPA QA/G-4, Sept. 1994), was applied to identify the objectives of this sampling and analysis. Results of the analysis will be used to validate predictions of a Sr concrete diffusion model, estimate the amount of radioactivity remaining in the tank shells, provide information to correlate with measurements taken by the Gunite Tank Isotope Mapping Probe and the Characterization End Effector, and estimate the performance of the wall cleaning system

  8. Reconnecting fragmented sturgeon populations in North American rivers

    Science.gov (United States)

    Jager, Henriette; Parsley, Michael J.; Cech, Joseph J. Jr.; McLaughlin, R.L.; Forsythe, Patrick S.; Elliott, Robert S.

    2016-01-01

    The majority of large North American rivers are fragmented by dams that interrupt migrations of wide-ranging fishes like sturgeons. Reconnecting habitat is viewed as an important means of protecting sturgeon species in U.S. rivers because these species have lost between 5% and 60% of their historical ranges. Unfortunately, facilities designed to pass other fishes have rarely worked well for sturgeons. The most successful passage facilities were sized appropriately for sturgeons and accommodated bottom-oriented species. For upstream passage, facilities with large entrances, full-depth guidance systems, large lifts, or wide fishways without obstructions or tight turns worked well. However, facilitating upstream migration is only half the battle. Broader recovery for linked sturgeon populations requires safe “round-trip” passage involving multiple dams. The most successful downstream passage facilities included nature-like fishways, large canal bypasses, and bottom-draw sluice gates. We outline an adaptive approach to implementing passage that begins with temporary programs and structures and monitors success both at the scale of individual fish at individual dams and the scale of metapopulations in a river basin. The challenge will be to learn from past efforts and reconnect North American sturgeon populations in a way that promotes range expansion and facilitates population recovery.

  9. Alternative Chemical Cleaning Methods for High Level Waste Tanks: Actual Waste Testing with SRS Tank 5F Sludge

    Energy Technology Data Exchange (ETDEWEB)

    King, William D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Hay, Michael S. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-08-30

    Solubility testing with actual High Level Waste tank sludge has been conducted in order to evaluate several alternative chemical cleaning technologies for the dissolution of sludge residuals remaining in the tanks after the exhaustion of mechanical cleaning and sludge sluicing efforts. Tests were conducted with archived Savannah River Site (SRS) radioactive sludge solids that had been retrieved from Tank 5F in order to determine the effectiveness of an optimized, dilute oxalic/nitric acid cleaning reagent toward dissolving the bulk non-radioactive waste components. Solubility tests were performed by direct sludge contact with the oxalic/nitric acid reagent and with sludge that had been pretreated and acidified with dilute nitric acid. For comparison purposes, separate samples were also contacted with pure, concentrated oxalic acid following current baseline tank chemical cleaning methods. One goal of testing with the optimized reagent was to compare the total amounts of oxalic acid and water required for sludge dissolution using the baseline and optimized cleaning methods. A second objective was to compare the two methods with regard to the dissolution of actinide species known to be drivers for SRS tank closure Performance Assessments (PA). Additionally, solubility tests were conducted with Tank 5 sludge using acidic and caustic permanganate-based methods focused on the “targeted” dissolution of actinide species.

  10. Operational test report - Project W-320 cathodic protection systems

    International Nuclear Information System (INIS)

    Bowman, T.J.

    1998-01-01

    Washington Administrative Code (WAC) 173-303-640 specifies that corrosion protection must be designed into tank systems that treat or store dangerous wastes. Project W-320, Waste Retrieval Sluicing System (WRSS), utilizes underground encased waste transfer piping between tanks 241-C-106 and 241-AY-102. Corrosion protection is afforded to the encasements of the WRSS waste transfer piping through the application of earthen ionic currents onto the surface of the piping encasements. Cathodic protection is used in conjunction with the protective coatings that are applied upon the WRSS encasement piping. WRSS installed two new two rectifier systems (46 and 47) and modified one rectifier system (31). WAC 173-303-640 specifies that the proper operation of cathodic protection systems must be confirmed within six months after initial installation. The WRSS cathodic protection systems were energized to begin continuous operation on 5/5/98. Sixteen days after the initial steady-state start-up of the WRSS rectifier systems, the operational testing was accomplished with procedure OTP-320-006 Rev/Mod A-0. This operational test report documents the OTP-320-006 results and documents the results of configuration testing of integrated piping and rectifier systems associated with the W-320 cathodic protection systems

  11. Connectivity between migrating and landlocked populations of a diadromous fish species investigated using otolith microchemistry.

    Directory of Open Access Journals (Sweden)

    Ingrid Tulp

    Full Text Available Smelt Osmerus eperlanus has two different life history strategies in The Netherlands. The migrating population inhabits the Wadden Sea and spawns in freshwater areas. After the closure of the Afsluitdijk in 1932, part of the smelt population became landlocked. The fresh water smelt population has been in severe decline since 1990, and has strongly negatively impacted the numbers of piscivorous water birds relying on smelt as their main prey. The lakes that were formed after the dike closure, IJsselmeer and Markermeer have been assigned as Natura 2000 sites, based on their importance for (among others piscivorous water birds. Because of the declining fresh water smelt population, the question arose whether this population is still supported by the diadromous population. Opportunities for exchange between fresh water and the sea are however limited to discharge sluices. The relationship between the diadromous and landlocked smelt population was analysed by means of otolith microchemistry. Our interpretation of otolith strontium ((88Sr patterns from smelt specimens collected in the fresh water area of Lake IJsselmeer and Markermeer, compared to those collected in the nearby marine environment, is that there is currently no evidence for a substantial contribution from the diadromous population to the spawning stock of the landlocked population.

  12. Conditioning of spent fuel assemblies from the Rossendorf RFR research reactor in transport and storage containers of the type CASTOR MTR 2

    International Nuclear Information System (INIS)

    Schneider, B.; Hofmann, G.

    1994-09-01

    Most of the spent fuel assemblies are temporarily stored in the flooded fuel ponds AB 1 and AB 2 of the RFR, and some are still in the reactor core. The conditioning task described here is part of the RFR spent fuel management concept and covers the safe emplacement of the spent fuel elements in the CASTOR MTR 2 shipping containers and the sealing of the containers in compliance with the nuclear licence issued for the conditioning task. The transfer of the spent fuel assemblies from the present wet storage conditions to the dry storage conditions in the CASTOR MTR 2 containers is done by a mobile manipulation equipment consisting essentially of the transfer sluice gate and a transfer container. Subsequent to conditioning, the shipping containers are to be transported to a licensed intermediate storage facility to await their transport to a national radwaste repository. The technical handling tools for the transfer and manipulation are briefly described, as well as the process steps involved, putting emphasis on the detailed description of processes and the accompanying time frame, so that the conditioning task can be incorporated into the work plan of the entire project. The report further presents the EDP concept established for the task, including the required data archivation and documentation. (orig.) [de

  13. Kiel Canal: Past and future threats for shipping resulting from precipitation, wind surge and sea level rise

    Science.gov (United States)

    Ganske, Anette; Hüttl-Kabus, Sabine; Möller, Jens; Schade, Nils; Heinrich, Hartmut; Tinz, Birger

    2017-04-01

    The Kiel Canal is the most frequented artificial waterway in the world. It connects the North Sea and the Hamburg Harbor with the Baltic Sea and has a length of about 100 km. The Canal receives its water from the upper catchment of the river Eider. Discharge from the Canal towards the North Sea is via the sluices at Brunsbüttel (90%) into river Elbe and into the Baltic Sea via the sluices at Kiel-Holtenau. A risk of closure of the Canal occurs when high precipitation in the catchment meets high water levels in the river Elbe and/or the Baltic preventing the discharge of excess Canal water. Future sea level rise jointly with other effects such as possibly increasing wind surge and precipitation will close the gap between the inner and outer water levels, so that someday the outside levels will surmount the inner one. The German Federal Ministry of Transport and Digital Infrastructure (BMVI) tasked its internal Network of Experts to run a case study on the evolution of critical water levels in order to estimate risks and vulnerabilities for adaptation measures. First step of the investigation is a search for factors or combination of factors responsible for closures in the past. Candidates are factors such as higher water levels at low tides, high precipitation events on land, soil moisture and human factors like preventive water management measures. Second step will be the search for the natural criteria in climate projections. Here we report on the results of the first step of the case study with a focus on the exit towards the North Sea. There, discharge is possible only during low tide. Presently still sufficient difference in height exists between the levels in the Canal and the river Elbe allowing for a free flow of excess Canal water. Shipping is ceased when levels in the Canal surpass safety limits due to high precipitation events in the catchment jointly with high outer water levels. We used atmospheric data from ERA-Interim reanalysis instead of gauge data

  14. Cesium removal demonstration utilizing crystalline silicotitanate sorbent for processing Melton Valley Storage Tank supernate: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Walker, J.F. Jr.; Taylor, P.A.; Cummins, R.L. [and others

    1998-03-01

    This report provides details of the Cesium Removal Demonstration (CsRD), which was conducted at Oak Ridge National Laboratory (ORNL) on radioactive waste from the Melton Valley Storage Tanks. The CsRD was the first large-scale use of state-of-the-art sorbents being developed by private industry for the selective removal of cesium and other radionuclides from liquid wastes stored across the DOE complex. The crystalline silicotitanate sorbent used in the demonstration was chosen because of its effectiveness in laboratory tests using bench-scale columns. The demonstration showed that the cesium could be removed from the supernate and concentrated on a small-volume, solid waste form that would meet the waste acceptance criteria for the Nevada Test Site. During this project, the CsRD system processed > 115,000 L (30,000 gal) of radioactive supernate with minimal operational problems. Sluicing, drying, and remote transportation of the sorbent, which could not be done on a bench scale, were successfully demonstrated. The system was then decontaminated to the extent that it could be contact maintained with the use of localized shielding only. By utilizing a modular, transportable design and placement within existing facilities, the system can be transferred to different sites for reuse. The initial unit has now been removed from the process building and is presently being reinstalled for use in baseline operations at ORNL.

  15. Reflections on hydroelectric dams in the Amazon: water, energy and development

    Directory of Open Access Journals (Sweden)

    Bertha Koiffmann Becker

    2012-12-01

    Full Text Available The essay discusses the deployment of hydroelectric dams in the Amazon having as a starting point the relations between water and hydropower consumption at different scales of analyses. So, if all parts of the world are affected by global processes, they are not in the same way. The global scale is dominated by the apocalyptic discourse of increasing water scarcity and global warming, requiring the reduction of emissions of greenhouse gases through the use of renewable energy and new technologies. On a Brazilian national scale, the problems are, rather, how to manage the abundance of water with social and territorial justice, and how to stop the loss of 20% of the electricity produced. Finally, it is at the regional scale - in the Amazon - that major problems arise: i the biggest paradox between the abundance of water and social inaccessibility to this resource; ii most of the dams planned for the country will be built there, with the risk of negative impacts already known; iii the obligation of building sluices at all the proposed dams, suggested by the industrial sector in name of the rivers navigation, will serve, in fact, to export commodities produced in the Brazilian central region. An ethical question is, therefore, posed to society and to Brazilian government: are really needed so many hydroelectric dams in the Amazon?

  16. Method for offshore loading of a tanker and construction of said tanker. Fremgangsmte og farty for offshore oljelasting

    Energy Technology Data Exchange (ETDEWEB)

    Lerstad, A.; Breivik, K.; verli, O.; Egge, T.G.; Smedal, A.

    1994-07-04

    The invention relates to a vessel for offshore loading. The vessel comprises a number of centre tanks arranged in the longitudinal direction of the vessel, and a number of wing tanks located in pairs on either side of respective centre tanks. A loading line is connected to the centre tanks via respective valves, and adjacent centre tanks are connected to each other via bulkhead valves. The method comprises the steps firstly effecting filling of a desired number of the centre tanks. These are substantially narrower and having a correspondingly smaller volume than the wing tanks. Thereafter opening bulkhead valves between a centre tank and an appurtenant wing tank pair and sluicing out oil from centre tanks into the two wing tanks by means of the static pressure from the centre tank. The bulkhead valves between the centre tanks being open, so that the wing tank pair is filled as quickly as possible by suitable operation of the bulkhead valves between the centre tanks and of the valves of the loading line to the centre tanks. Closing the bulkhead valves to the two wing tanks when these and the appurtenant centre tank are filled to a desired level, and repeating the filling process to the steps and successively for additional wing tank pairs after that all centre tanks have been filled again. 10 figs.

  17. Waste Transfer Leaks Control Decision Record

    International Nuclear Information System (INIS)

    RYAN, G.W.

    2000-01-01

    Control decision meetings for Waste Transfer Leaks were held on April 24,25,26, and 27, 2000. The agenda for the control decision meetings is included in Appendix A, and attendee lists are included in Appendix B. The purpose of the control decision meetings was to review and revise previously selected controls for the prevention or mitigation of waste transfer leak accidents. Re-evaluation of the controls is warranted due to revisions in the hazard and accident analysis for these Tank Farm events. In particular, calculated radiological consequences are significantly reduced from those currently reported in the Final Safety Analysis Report (FSAR). Revised hazard and accident analysis and a revised control recommendation will be reflected in an Authorization Basis Amendment to be submitted at the Department of Energy, Office of River Protection's (ORP's) request by June 30, 2000 to satisfy ORP Performance Incentive (PI) 2.1.1, Revision 1, ''Authorization Basis Management Process Efficiency Improvement''. The scope of the control decision meetings was to address all waste transfer leak-related hazardous conditions identified in the Tank Farm hazard analysis database, excluding those associated with the use of the Replacement Cross-Site Transfer System (RCSTS) slurry line and sluicing of Tank 241-C-106, which is addressed in FSAR Addendum 1. The scope of this control decision process does include future waste feed delivery waste transfer operations

  18. Cesium removal demonstration utilizing crystalline silicotitanate sorbent for processing Melton Valley Storage Tank supernate: Final report

    International Nuclear Information System (INIS)

    Walker, J.F. Jr.; Taylor, P.A.; Cummins, R.L.

    1998-03-01

    This report provides details of the Cesium Removal Demonstration (CsRD), which was conducted at Oak Ridge National Laboratory (ORNL) on radioactive waste from the Melton Valley Storage Tanks. The CsRD was the first large-scale use of state-of-the-art sorbents being developed by private industry for the selective removal of cesium and other radionuclides from liquid wastes stored across the DOE complex. The crystalline silicotitanate sorbent used in the demonstration was chosen because of its effectiveness in laboratory tests using bench-scale columns. The demonstration showed that the cesium could be removed from the supernate and concentrated on a small-volume, solid waste form that would meet the waste acceptance criteria for the Nevada Test Site. During this project, the CsRD system processed > 115,000 L (30,000 gal) of radioactive supernate with minimal operational problems. Sluicing, drying, and remote transportation of the sorbent, which could not be done on a bench scale, were successfully demonstrated. The system was then decontaminated to the extent that it could be contact maintained with the use of localized shielding only. By utilizing a modular, transportable design and placement within existing facilities, the system can be transferred to different sites for reuse. The initial unit has now been removed from the process building and is presently being reinstalled for use in baseline operations at ORNL

  19. Fly ash dynamics in soil-water systems

    International Nuclear Information System (INIS)

    Sharma, S.; Fulekar, M.H.; Jayalakshmi, C.P.

    1989-01-01

    Studies regarding the effluents and coal ashes (or fly ash) resulting from coal burning are numerous, but their disposal and interactions with the soil and water systems and their detailed environmental impact assessment with concrete status reports on a global scale are scanty. Fly ash dynamics in soil and water systems are reviewed. After detailing the physical composition of fly ash, physicochemical changes in soil properties due to fly ash amendment are summarized. Areas covered include texture and bulk density, moisture retention, change in chemical equilibria, and effects of fly ash on soil microorganisms. Plant growth in amended soils is discussed, as well as plant uptake and accumulation of trace elements. In order to analyze the effect of fly ash on the physicochemical properties of water, several factors must be considered, including surface morphology of fly ash, pH of the ash sluice water, pH adjustments, leachability and solubility, and suspended ash and settling. The dynamics of fly ash in water systems is important due to pollution of groundwater resources from toxic components such as trace metals. Other factors summarized are bioaccumulation and biomagnification, human health effects of contaminants, and the impact of radionuclides in fly ash. Future research needs should focus on reduction of the environmental impact of fly ash and increasing utilization of fly ash as a soil amendment. 110 refs., 2 figs., 10 tabs

  20. Suspended silt concentrations in the lower Olifants River (Mpumalanga and the impact of silt releases from the Phalaborwa Barrage on water quality and fish survival

    Directory of Open Access Journals (Sweden)

    Y. Buermann

    1995-08-01

    Full Text Available Silt loads in the Olifants and Sabie river systems inside the Kruger National Park, were monitored by collecting water samples every consecutive week for a period of 20 months. The variation in silt concentration, changes in selected physico-chemical water quality variables and fish mortalities during flushing (i.e. release of silt, by sluicing of the Phalaborwa Barrage, were also monitored. The Olifants River inside the Kruger National Park carried high silt loads in summer; in the dry season the suspensoid load was greatly reduced. A similar pattern was observed in the Sabie River, but the silt loads were generally lower. It was apparent that silt loads released from the Phalaborwa Barrage led to large variations in the natural silt loads of the Olifants River. These increased amounts of silt (25 000 mg/1 to >70 000 mg/1 caused drastic reductions in the dissolved oxygen concentration of the water, ranging from >6 mg/1 to 0 mg/1. Depending on the severity and duration of the flushing, fish succumb to such silt loads. These findings, as well as published information, indicate that the management strategy of flushing to improve storage capacity is ecological unacceptable. It is therefore suggested that the use of the Phalaborwa Barrage as a future reservoir should be critically re-evaluated.

  1. Characteristics of Air Entrainment in Hydraulic Jump

    Science.gov (United States)

    Albarkani, M. S. S.; Tan, L. W.; Al-Gheethi, A.

    2018-04-01

    The characteristics of hydraulic jump, especially the air entrainment within jump is still not properly understood. Therefore, the current work aimed to determine the size and number of air entrainment formed in hydraulic jump at three different Froude numbers and to obtain the relationship between Froude number with the size and number of air entrainment in hydraulic jump. Experiments of hydraulic jump were conducted in a 10 m long and 0.3 m wide Armfield S6MKII glass-sided tilting flume. Hydraulic jumps were produced by flow under sluice gate with varying Froude number. The air entrainment of the hydraulic jump was captured with a Canon Power Shot SX40 HS digital camera in video format at 24 frames per second. Three discharges have been considered, i.e. 0.010 m3/s, 0.011 m3/s, and 0.013 m3/s. For hydraulic jump formed in each discharge, 32 frames were selected for the purpose of analysing the size and number of air entrainment in hydraulic jump. The results revealed that that there is a tendency to have greater range in sizes of air bubbles as Fr1 increases. Experiments with Fr1 = 7.547. 7.707, and 7.924 shown that the number of air bubbles increases exponentially with Fr1 at a relationship of N = 1.3814 e 0.9795Fr1.

  2. A model for describing the eutrophication in a heavily regulated coastal lagoon. Application to the Albufera of Valencia (Spain).

    Science.gov (United States)

    del Barrio Fernández, Pilar; Gómez, Andrés García; Alba, Javier García; Díaz, César Álvarez; Revilla Cortezón, José Antonio

    2012-12-15

    A simplified two-dimensional eutrophication model was developed to simulate temporal and spatial variations of chlorophyll-a in heavily regulated coastal lagoons. This model considers the hydrodynamics of the whole study area, the regulated connexion of the lagoon with the sea, the variability of the input and output nutrient loads, the flux from the sediments to the water column, the phytoplankton growth and mortality kinetics, and the zooplankton grazing. The model was calibrated and validated by applying it to the Albufera of Valencia, a hypertrophic system whose connection to the sea is strongly regulated by a system of sluice-gates. The calibration and validation results presented a significant agreement between the model and the data obtained in several surveys. The accuracy was evaluated using a quantitative analysis, in which the average uncertainty of the model prediction was less than 6%. The results confirmed an expected phytoplankton bloom in April and October, achieving mean maximum values around 250 μg l(-1) of chlorophyll-a. A mass balance revealed that the eutrophication process is magnified by the input loads of nutrients, mainly from the sediments, as well as by the limited connection of the lagoon with the sea. This study has shown that the developed model is an efficient tool to manage the eutrophication problem in heavily regulated coastal lagoons. Copyright © 2012 Elsevier Ltd. All rights reserved.

  3. Regulatory issues associated with closure of the Hanford AX Tank Farm ancillary equipment

    International Nuclear Information System (INIS)

    Becker, D.L.

    1998-01-01

    Liquid mixed, high-level radioactive waste has been stored in underground single-shell tanks at the US Department of Energy's (DOE's) Hanford Site. After retrieval of the waste from the single-shell tanks, the DOE will proceed with closure of the tank farm. The 241-AX Tank Farm includes four one-million gallon single-shell tanks in addition to sluice lines, transfer lines, ventilation headers, risers, pits, cribs, catch tanks, buildings, well and associated buried piping. This equipment is classified as ancillary equipment. This document addresses the requirements for regulatory close of the ancillary equipment in the Hanford Site 241-AX Tank Farm. The options identified for physical closure of the ancillary equipment include disposal in place, disposal in place after treatment, excavation and disposal on site in an empty single-shell tank, and excavation and disposal outside the AX Tank Farm. The document addresses the background of the Hanford Site and ancillary equipment in the AX Tank Farm, regulations for decontamination and decommissioning of radioactively contaminated equipment, requirements for the cleanup and disposal of radioactive wastes, cleanup and disposal requirements governing hazardous and mixed waste, and regulatory requirements and issues associated with each of the four physical closure options. This investigation was conducted by the Sandia National Laboratories, Albuquerque, New Mexico, during Fiscal Year 1998 for the Hanford Tanks Initiative Project

  4. Studies on oxygen depletion and the toxic effect of sediments; Untersuchungen zur Sauerstoffzehrung und toxischen Wirkung von Sedimenten

    Energy Technology Data Exchange (ETDEWEB)

    Pfitzner, S.; Giest, B.; Wotzka, J. [Bundesanstalt fuer Gewaesserkunde, Berlin (Germany)

    2000-11-01

    Depending on their composition and how they were formed, water sediments contain varying amounts of oxygen-depleting substances. Their portion is particularly high in fine sediment and sediments formed in conjunction with exposure to a high level of wastewater. Particularly in current-free areas like old arms, indentations, sluices and outer ports, sediment forms with a high fine grain content and a correspondingly higher potential for depletion. If, for instance, the sediments are moved and stirred up during dredging, this may impair their oxygen content since oxygen consumption is far higher in a suspended sediment than when it is undisturbed on the water bottom. The very rapid spontaneous chemical oxidation and biological oxidation of reduced substances are possible oxygen-consuming processes. (orig.) [German] Gewaessersedimente enthalten in Abhaengigkeit von ihrer Zusammensetzung und der Art ihrer Entstehung unterschiedliche Mengen an Sauerstoff zehrenden Substanzen. Ihr Anteil ist besonders hoch in Feinsedimenten und solchen, die sich unter starkem Abwassereinfluss bilden konnten. Insbesondere in stroemungsberuhigten Gebieten, wie Altarmen, Ausbuchtungen sowie Schleusen und deren Vorhaefen, reichern sich Sedimente mit hohem Feinkornanteil und dementsprechend hoher potenzieller Zehrungsfaehigkeit an. Werden die Sedimente beispielsweise durch Baggermassnahmen bewegt und aufgewirbelt, kann es zur Beeintraechtigung des Sauerstoffhaushaltes kommen, da der Sauerstoffverbrauch eines Sedimentes bei Suspension um ein Vielfaches hoeher als bei ungestoerter Lagerung am Gewaesserboden sein kann. Als Sauerstoff verbrauchende Prozesse kommen die sehr schnell verlaufende spontane chemische Oxidation sowie die biologische Oxidation reduzierter Substanzen in Betracht. (orig.)

  5. Magnetometer calibration and test procedure

    International Nuclear Information System (INIS)

    Squier, D.M.

    1997-01-01

    Nuclear waste has been sluiced and pumped from storage tank 241-AX-104, leaving a contaminated heel volume. These operations did not include measurements of the removed waste volume leaving an unknown heel volume in the tank. A magnetometer transducer will be lowered through tank riser ports to rest on the heel's surface. The heel thickness will control the distance between the transducer and the tank's bottom The instrument's output varies with the distance from a magnetic mass, such as the tank's steel bottom, thereby enabling a measurement of the heel depth. Measurements at several tank locations will permit an estimate of the tank's heel volume. The magnetometer's output is influenced by adjacent magnetic materials, such as the tank walls, air lift circulators or other equipment installed in the tank. An adjacent vertical steel surface produces a voltage offset in the instrument's output. Measurements near a tank wall or other tank components may be corrected by noting the offset before the instrument's output is influenced by the tank bottom. An unlevel or uneven heel surface could orient the magnetometer transducer so that it is not vertically level. The magnetometer readings are influenced by these skewed transducer orientations. The magnitude of these errors and offsets must be characterized to bound the heel volume estimate range. The data collected by this activity will be statistically analyzed by SESC to state the confidence level of the heel volume estimates. A test report will document the results of the measurements

  6. Arsenic activation analysis of freshwater fish through the precipitation of elemental arsenic

    International Nuclear Information System (INIS)

    Comparetto, G.M.; Jester, W.A.; Skinner, W.F.

    1982-01-01

    The activation analysis of trace elements of arsenic in biological samples is complicated by the interference of a 82 Br photo peak (554KeV) and the compton continuum with the major 76 As photo peak of 559 KeV. In addition, the half-lives of 24 Na, 82 Br, and 76 As are too similar to be resolved by varying irradiation and/or decay times. Thus post irradiation chemical separation of arsenic is often required. A study of existing radiochemistry techniques reported in the literature found that existing methods were complex x and/or lengthy. In this work, a more rapid and less extensive method was required to analyze a large number of fish samples exposed to fly ash sluice water from coalburning power plant. A method has been developed which involves the dissolution of irradiated homogenized fish samples, the addition of an arsenic carrier, and the reduction of arsenic to the +3 state. Arsenic is then precipitated as elemental arsenic. An important factor in this work was the discovery that this procedure produced arsenic yields of 81+-3% for both the fish samples and the NBC Orchard leaves standard employed in this analysis. Thus the determination of absolute arsenic yields is not required. This method has been used to analyze 32 of the fish samples the average arsenic content of which was found to vary between 0.08 and 4.8 ppm. (author)

  7. Performance Assessment of the Waste Dislodging Conveyance System During the Gunite And Associated Tanks Remediation Project

    International Nuclear Information System (INIS)

    Lloyd, P.D.

    2001-01-01

    The Waste Dislodging and Conveyance System (WD and CS) and other components of the Tank Waste Retrieval System (TWRS) were developed to address the need for removal of hazardous wastes from underground storage tanks (USTs) in which radiation levels and access limitations make traditional waste retrieval methods impractical. Specifically, these systems were developed for cleanup of the Gunite and Associated Tanks (GAAT) Operable Unit (OU) at the Oak Ridge National Laboratory (ORNL). The WD and CS is comprised of a number of different components. The three primary hardware subsystems are the Hose Management System (HMS), the Confined Sluicing End-Effector (CSEE), and the Flow Control Equipment and Containment Box (FCE/CB). In addition, a Decontamination Spray Ring (DSR) and a control system were developed for the system. The WD and CS is not a stand-alone system; rather, it is designed for deployment with either a long-reach manipulator like the Modified Light Duty Utility Arm (MLDUA) or a remotely operated vehicle system such as the Houdinitrademark. The HMS was designed to act as a pipeline for the transfer of dislodged waste; as a hose-positioning and tether-management system; and as a housing for process equipment such as the water-powered jet pump that provides the necessary suction to vacuum slurried waste from the UST. The HMS was designed to facilitate positioning of an end-effector at any point within the 25-ft- or 50-ft-diameter USTs in the GAAT OU

  8. Sampling and analysis plan for the gunite and associated tanks interim remedial action, wall coring and scraping at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-02-01

    This Sampling and Analysis Plan documents the procedures for collecting and analyzing wall core and wall scraping samples from the Gunite and Associated Tanks. These activities are being conducted to support the Comprehensive Environmental Response, Compensation, and Liability Act at the gunite and associated tanks interim remedial action at Oak Ridge National Laboratory in Oak Ridge, Tennessee. The sampling and analysis activities will be performed in concert with sludge retrieval and sluicing of the tanks. Wall scraping and/or wall core samples will be collected from each quadrant in each tank by using a scraping sampler and/or a coring drill deployed by the Houdini robot vehicle. Each sample will be labeled, transported to the Radioactive Materials Analytical Laboratory, and analyzed for physical and radiological characteristics, including total activity, gross alpha, gross beta, radioactive strontium and cesium, and other alpha- and gamma-emitting radionuclides. The data quality objectives process, based on US Environmental Protection Agency guidance, was applied to identify the objectives of this sampling and analysis. The results of the analysis will be used to (1) validate predictions of a strontium concrete diffusion model, (2) estimate the amount of radioactivity remaining in the tank shells, (3) provide information to correlate with measurements taken by the Gunite Tank Isotope Mapping Probe and the Characterization End Effector, and (4) estimate the performance of the wall cleaning system. This revision eliminates wall-scraping samples from all tanks, except Tank W-3. The Tank W-3 experience indicated that the wall scrapper does not collect sufficient material for analysis

  9. DEVELOPMENT AND DEPLOYMENT OF THE MOBILE ARM RETRIEVAL SYSTEM (MARS) - 12187

    Energy Technology Data Exchange (ETDEWEB)

    BURKE CA; LANDON MR; HANSON CE

    2011-11-08

    Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are beinglhave been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan [1]. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012.

  10. [The facets of creativity in the light of bipolar mood alterations].

    Science.gov (United States)

    Szakács, Réka

    2018-01-30

    The link between creativity, as the highest expression form of human achievement, and bipolar disorder came into focus of scientific investigations and research. Accomplished writers, composers and visual artists show a substantially higher rate of affective disorders, prodominantly bipolar mood disorders, comparing to the general population. Then again, patients afflicted with bipolar II subtype (hypomania and depression), as well as persons presenting the mildest form of bipolar mood swings (cyclothymia) possess higher creative skills. It evokes therefore that certain forms and mood states of bipolar disorder, notably hypomania might convey cognitive, emotional/affective, and motivational benefits to creativity. The aim of this paper is to display expression forms of creativity (writing, visual art, scientific work) as well as productivity (literary and scientific work output, number of artworks and exhibitions, awards) in the light of clinically diagnosed mood states at an eminent creative individual, treated for bipolar II disorder. Analysing the affective states, we found a striking relation between hypomanic episodes and visual artistic creativity and achievement, as well as scientific performance, whereas mild-moderate depressed mood promoted literary work. Severe depression and mixed states were not associated with creative activities, and intriguingly, long-term stabilised euthymic mood, exempted from marked affective lability, is disadvantageous regarding creativity. It seems, thereby, that mood functions as a sluice of creativity. Nevertheless, it is likely that there is a complex interaction between bipolar mood disorder spectrum and psychological factors promoting creativity, influenced also by individual variability due to medication, comorbid conditions, and course of disorder.

  11. Construction Method Study For Installation Of A Large Riser In A Single-Shell Tank

    International Nuclear Information System (INIS)

    Adkisson, D.A.

    2010-01-01

    This study evaluates and identifies a construction method for cutting a hole in a single-shell tank dome. This study also identifies and evaluates vendors for performing the cut. Single-shell tanks (SST) in the 241-C tank farm are currently being retrieved using various retrieval technologies (e.g., modified sluicing). The Hanford Federal Facility Agreement and Consent Order require that the SSTs be retrieved to less than 360 cubic feet of radioactive waste. The current technologies identified and deployed for tank retrieval have not been able to retrieve waste in accordance with the Hanford Federal Facility Agreement and Consent Order. As such, alternative retrieval systems have been proposed and are currently under construction that will have the ability to retrieve waste to this defined level. The proposed retrieval systems will not fit down existing risers. New risers will need to be installed to provide the retrieval systems access to the inside of the SSTs. The purpose of this study is two-fold. The first objective is to identify multiple concrete cutting technologies and perform an initial pre-screening, evaluate the technologies identified for more in-depth analysis, and recommend a technology/methodology for cutting a hole in the tank dome. The identified/pre-screened methods will be evaluated based on the following criteria: (1) Maturity/complexity; (2) Waste generation; (3) Safety; (4) Cost; and (5) Schedule. Once the preferred method is identified to cut the hole in the tank dome, the second objective is to identify, evaluate, and recommend a vendor for the technology selected that will perform the cutting process.

  12. Out-of-tank evaporator demonstration. Final report

    International Nuclear Information System (INIS)

    Lucero, A.J.; Jennings, H.L.; VanEssen, D.C.

    1998-02-01

    The project reported here was conducted to demonstrate a skid-mounted, subatmospheric evaporator to concentrate liquid low-level waste (LLLW) stored in underground tanks at Oak Ridge National Laboratory (ORNL). This waste is similar to wastes stored at Hanford and Savannah River. A single-stage subatmospheric evaporator rated to produce 90 gallons of distillate per hour was procured from Delta Thermal, Inc., of Pensacola, Florida, and installed in an existing building. During the 8-day demonstration, 22,000 gal of LLLW was concentrated by 25% with the evaporator system. Decontamination factors achieved averaged 5 x 10 6 (i.e., the distillate contained five million times less Cesium 137 than the feed). Evaporator performance substantially exceeded design requirements and expectations based on bench-scale surrogate test data. Out-of tank evaporator demonstration operations successfully addressed the feasibility of hands-on maintenance. Demonstration activities indicate that: (1) skid-mounted, mobile equipment is a viable alternative for the treatment of ORNL LLLW, and (2) hands-on maintenance and decontamination for movement to another site is achievable. Cost analysis show that 10% of the demonstration costs will be immediately recovered by elimination of solidification and disposal costs. The entire cost of the demonstration can be recovered by processing the inventory of Melton Valley Storage Tank waste and/or sluice water prior to solidifications. An additional savings of approximately $200,000 per year can be obtained by processing newly generated waste through the system. The results indicate that this type of evaporator system should be considered for application across the DOE complex. 25 refs., 11 figs., 2 tabs

  13. HYDROLOGIC AND FEATURE-BASED SURFACE ANALYSIS FOR TOOL MARK INVESTIGATION ON ARCHAEOLOGICAL FINDS

    Directory of Open Access Journals (Sweden)

    K. Kovács

    2012-07-01

    Full Text Available The improvement of detailed surface documentation methods provides unique tool mark-study opportunities in the field of archaeological researches. One of these data collection techniques is short-range laser scanning, which creates a digital copy of the object’s morphological characteristics from high-resolution datasets. The aim of our work was the accurate documentation of a Bronze Age sluice box from Mitterberg, Austria with a spatial resolution of 0.2 mm. Furthermore, the investigation of the entirely preserved tool marks on the surface of this archaeological find was also accomplished by these datasets. The methodology of this tool mark-study can be summarized in the following way: At first, a local hydrologic analysis has been applied to separate the various patterns of tools on the finds’ surface. As a result, the XYZ coordinates of the special points, which represent the edge lines of the sliding tool marks, were calculated by buffer operations in a GIS environment. During the second part of the workflow, these edge points were utilized to manually clip the triangle meshes of these patterns in reverse engineering software. Finally, circle features were generated and analysed to determine the different sections along these sliding tool marks. In conclusion, the movement of the hand tool could be reproduced by the spatial analysis of the created features, since the horizontal and vertical position of the defined circle centre points indicated the various phases of the movements. This research shows an exact workflow to determine the fine morphological structures on the surface of the archaeological find.

  14. DEVELOPMENT AND DEPLOYMENT OF THE MOBILE ARM RETRIEVAL SYSTEM (MARS) - 12187

    Energy Technology Data Exchange (ETDEWEB)

    BURKE CA; LANDON MR; HANSON CE

    2012-01-30

    Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are being/have been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012.

  15. Deposition of Suspended Clay to Open and Sand-Filled Framework Gravel Beds in a Laboratory Flume

    Science.gov (United States)

    Mooneyham, Christian; Strom, Kyle

    2018-01-01

    Pulses of fine sediment composed of sand, silt, and clay can be introduced to gravel bed rivers through runoff from burn-impacted hillslopes, landslides, bank failure, or the introduction of reservoir sediment as a result of sluicing or dam decommissioning. Here we present a study aimed at quantifying exchange between suspensions of clay and gravel beds. The questions that motivate the work are: how do bed roughness and pore space characteristics, shear velocity (u∗), and initial concentration (C0) affect clay deposition on or within gravel beds? Where does deposition within these beds occur, and can deposited clay be resuspended while the gravel is immobile? We examine these questions in a laboratory flume using acrylic, open-framework gravel, and armored sand-gravel beds under conditions of varying u∗ and C0. Deposition of clay occurred to all beds (even with Rouse numbers ˜ 0.01). We attribute deposition under full suspension conditions to be an outcome of localized protected zones where clay can settle and available pore space in the bed. For smooth wall cases, protection came from the viscous wall region and the development of bed forms; for the rough beds, protection came from separation zones and low-velocity pore spaces. Bed porosity was the strongest influencer of nondimensional deposition rate; deposition increased with porosity. Deposition was inversely related to u∗ for the acrylic bed runs; no influence of u∗ was found for the porous bed runs. Increases in discharge resulted in resuspension of clay from acrylic beds; no resuspension was observed in the porous bed runs.

  16. Combined risk assessment of nonstationary monthly water quality based on Markov chain and time-varying copula.

    Science.gov (United States)

    Shi, Wei; Xia, Jun

    2017-02-01

    Water quality risk management is a global hot research linkage with the sustainable water resource development. Ammonium nitrogen (NH 3 -N) and permanganate index (COD Mn ) as the focus indicators in Huai River Basin, are selected to reveal their joint transition laws based on Markov theory. The time-varying moments model with either time or land cover index as explanatory variables is applied to build the time-varying marginal distributions of water quality time series. Time-varying copula model, which takes the non-stationarity in the marginal distribution and/or the time variation in dependence structure between water quality series into consideration, is constructed to describe a bivariate frequency analysis for NH 3 -N and COD Mn series at the same monitoring gauge. The larger first-order Markov joint transition probability indicates water quality state Class V w , Class IV and Class III will occur easily in the water body of Bengbu Sluice. Both marginal distribution and copula models are nonstationary, and the explanatory variable time yields better performance than land cover index in describing the non-stationarities in the marginal distributions. In modelling the dependence structure changes, time-varying copula has a better fitting performance than the copula with the constant or the time-trend dependence parameter. The largest synchronous encounter risk probability of NH 3 -N and COD Mn simultaneously reaching Class V is 50.61%, while the asynchronous encounter risk probability is largest when NH 3 -N and COD Mn is inferior to class V and class IV water quality standards, respectively.

  17. Towards a systemic assessment of environmental impact (SAEI regarding alternative hydrosedimentological management practice in the Canal del Dique, Colombia

    Directory of Open Access Journals (Sweden)

    Leonel Vega Mora

    2013-09-01

    Full Text Available The Canal del Dique, located on the Colombian Caribbean Coast, can be seen as an "artificial" branch of the River Magdalena. Since its inception in 1650, it has undergone a series of interventions aimed at optimising river navigation between Cartagena and the interior of the country, little consideration having been paid to institutional, economic, social and environmental impacts.This paper presents a systemic assessment of environmental impact (SAEI methodology, based on systemic parameterisation of the environment, proposed by Vega [2011], for the strategic environmental assessment of policy, plans, programmes or large-scale projects, considering a case study of the Canal del Dique environmental rehabilitation as proposed by the Colombian government.Information arising from the framework of an inter-administrative agreement between the Universidad Nacional de Colombia and the Regional Autonomous Corporation for the Rio Grande de la Magdalena (CORMAGDALENA was used for studying the environmental restoration of and navigation in the Canal del Dique [UN-LEH, 2008]. The authors developed and summarised SAEI regarding six alternatives for hydrosedimentological management in the canal to obtain results concerning environmental impairment or improvement regarding each factor considered, and the degree of aggressiveness or betterment involved in each alternative.Alternative 4, an enhanced version of current condition (ECC would have produced the greatest environmental benefit (i.e. limited dredging plus optimising channel-wetland interconnection requiring the narrowing of three straight reaches along the canal and the construction of a sluice-gate system in the Strait of Paracuica (near the town of El Recreo.

  18. HOUDINI: RECONFIGURABEL IN-TANK ROBOT

    Energy Technology Data Exchange (ETDEWEB)

    Bruce Thompson; Adam Slifko

    1997-02-12

    This report details the development of a reconfigurable in-tank robotic cleanup systems called Houdini{trademark}. Driven by the general need to develop equipment for the removal of radioactive waste from hundreds of DOE waste storage tanks and the specific needs of DOE sites such as Oak Ridge National Laboratory and Fernald, Houdini{trademark} represents one of the possible tools that can be used to mobilize and retrieve this waste material for complete remediation. Houdini{trademark} is a hydraulically powered, track driven, mobile work vehicle with a collapsible frame designed to enter underground or above ground waste tanks through existing 24 inch riser openings. After the vehicle has entered the waste tank, it unfolds and lands on the waste surface or tank floor to become a remotely operated mini-bulldozer. Houdini{trademark} utilizes a vehicle mounted plow blade and 6-DOF manipulator to mobile waste and carry other tooling such as sluicing pumps, excavation buckets, and hydraulic shears. The complete Houdini{trademark} system consists of the tracked vehicle and other support equipment (e.g., control console, deployment system, hydraulic power supply, and controller) necessary to deploy and remotely operate this system at any DOE site. Inside the storage tanks, the system is capable of performing heel removal, waste mobilization, waste size reduction, and other tank waste retrieval and decommissioning tasks. The first Houdini{trademark} system was delivered on September 24, 1996 to Oak Ridge National Laboratory (ORNL). The system acceptance test was successfully performed at a cold test facility at ORNL. After completion of the cold test program and the training of site personnel, ORNL will deploy the system for clean-up and remediation of the Gunite storage tanks.

  19. Converting an estuary to Lake Grevelingen: Environmental review of a coastal engineering project

    Science.gov (United States)

    Saeijs, H. L. F.; Stortelder, P. B. M.

    1982-09-01

    To guarantee protection from storm floods in the southwestern part of the Netherlands, the length of exposed coastline is being greatly reduced by the construction of dams and a storm surge barrier. As part of the Delta Project, the mouth of the Grevelingen estuary was closed in 1971. Due to the closure, tidal movement was eliminated, which resulted in changes in environmental factors such as transparency and chloride and phosphate concentration. The number of plant and animal groups decreased. Large areas of sand flats and salt marshes, which were formerly exposed to the tides, were left “high and dry.” This resulted in enormous changes for the communities living in these areas. The development of a new ecological system and the changed potential afforded by the water and land areas for human use, emphasized the need for physical planning. The potential uses (functions) of the new system are discussed in this article. Special attention is given to the demand for recreational facilities and nature conservation and to the balanced realization of these main functions. The methods applied in choosing between alternatives in physical planning are explained. Water quality and ecosystem management are discussed. One of the main management objectives is the prevention of a further decrease in the chloride concentration and the number of species. A sluice was, therefore, put into operation in 1978, by means of which water was exchanged between the North Sea and Lake Grevelingen. The responses observed are discussed here. In the near future, a crucial decision will have to be made: Will Lake Grevelingen remain a salt-water lake or will it become a fresh-water lake?

  20. Strategies for redundancy resolution of dual-arm systems with passive elements for tank waste removal

    International Nuclear Information System (INIS)

    Dubey, R.

    1997-01-01

    The work described in this paper focuses on the coordination and control of two manipulators coupled by passive elements operating in a confined space. An example of one such system is the hardware used for the environmental response treatability study funded by the Department of Energy at Oak Ridge National Laboratory (ORNL). The motivation for this project is to establish the methodology necessary to extract large volumes of hazardous waste from underground storage facilities. The hardware used at ORNL consists of two long-reach manipulators. The first robot, the Modified Light Duty Utility Arm (MLDUA), is an 8-degree-of-freedom long-reach manipulator. The second arm, the Hose Management Arm (HMA), has two active degrees-of-freedom and provides hardware to break up and extract materials from the tank. Current strategies call for the MLDUA to grasp a combined sluicing end-effector attached, by a long flexible hose, to the HMA. The MLDUA will then move the combined system through the waste, extracting material. This paper describes many of the issues related to redundancy resolution and the coordinated control of these two robots. First, the authors provide a brief outline of the project and the existing hardware. This is followed by a description of existing redundancy resolution techniques and the impact redundancy has on the success of the project. Finally, preliminary simulation results show the effect cooperative control has on the level of forces generated between the dual-arm systems when coupled by an elastic exhaust hose. These results show a significant reduction in forces when both arms are active and have a combined manipulation strategy

  1. Houdini trademark: Reconfigurable in-tank mobile robot. Final report, June 1995 - January 1997

    International Nuclear Information System (INIS)

    Thompson, B.; Slifko, A.

    1998-01-01

    This report details the development of a reconfigurable in-tank robotic cleanup system called Houdini trademark. Driven by the general need to develop equipment for the removal of radioactive waste from hundreds of DOE waste storage tanks and the specific needs of DOE sites such as Oak Ridge National Laboratory and Fernald, Houdini trademark represents one of the possible tools that can be used to mobilize and retrieve this waste material for complete remediation. Houdini trademark is a hydraulically powered, track driven, mobile work vehicle with a collapsible frame designed to enter underground or above ground waste tanks through existing 24 inch riser openings. After the vehicle has entered the waste tank, it unfolds and lands on the waste surface or tank floor to become a remotely operated mini-bulldozer. Houdini trademark utilizes a vehicle mounted plow blade and 6-DOF manipulator to mobilize waste and carry other tooling such as sluicing pumps, excavation buckets, and hydraulic shears. The complete Houdini trademark system consists of the tracked vehicle and other support equipment (e.g., control console, deployment system, hydraulic power supply, and controller) necessary to deploy and remotely operate this system at any DOE site. Inside the storage tanks, the system is capable of performing heel removal, waste mobilization, waste size reduction, and other tank waste retrieval and decommissioning tasks. The first Houdini trademark system was delivered on September 24, 1996 to Oak Ridge National Laboratory (ORNL). The system acceptance test was successfully performed at a cold test facility at ORNL. After completion of the cold test program and the training of site personnel, ORNL will deploy the system for clean-up and remediation of the Gunite storage tanks

  2. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 2 [of 2

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, BE

    2003-10-07

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and {approx}420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. Volume 1 provides information on the various phases of the project and describes the types of equipment used. Volume 1 also discusses the tank waste retrieval performance and the lessons learned during the remediation effort. Volume 2 consists of the following appendixes, which are referenced in Vol. 1: A--Background Information for the Gunite and Associated Tanks Operable Unit; B--Annotated Bibliography; C--GAAT Equipment Matrix; D--Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; and E--Vendor List for the GAAT Remediation Project. The remediation of the GAATs was completed {approx}5.5 years ahead of schedule and {approx}$120,435K below the cost estimated in the Remedial Investigation/Feasibility Study for the project. These schedule and cost savings were a direct result of the selection and use of state-of-the-art technologies and the dedication and drive of the engineers, technicians, managers, craft workers, and support personnel that made up the GAAT Remediation Project Team.

  3. ANN Model for Predicting the Impact of Submerged Aquatic Weeds Existence on the Hydraulic Performance of Branched Open Channel System Accompanied by Water Structures

    International Nuclear Information System (INIS)

    Abdeen, Mostafa A. M.; Abdin, Alla E.

    2007-01-01

    The existence of hydraulic structures in a branched open channel system urges the need for considering the gradually varied flow criterion in evaluating the different hydraulic characteristics in this type of open channel system. Computations of hydraulic characteristics such as flow rates and water surface profiles in branched open channel system with hydraulic structures require tremendous numerical effort especially when the flow cannot be assumed uniform. In addition, the existence of submerged aquatic weeds in this branched open channel system adds to the complexity of the evaluation of the different hydraulic characteristics for this system. However, this existence of aquatic weeds can not be neglected since it is very common in Egyptian open channel systems. Artificial Neural Network (ANN) has been widely utilized in the past decade in civil engineering applications for the simulation and prediction of the different physical phenomena and has proven its capabilities in the different fields. The present study aims towards introducing the use of ANN technique to model and predict the impact of submerged aquatic weeds existence on the hydraulic performance of branched open channel system. Specifically the current paper investigates a branched open channel system that consists of main channel supplies water to two branch channels that are infested by submerged aquatic weeds and have water structures such as clear over fall weirs and sluice gates. The results of this study showed that ANN technique was capable, with small computational effort and high accuracy, of predicting the impact of different infestation percentage for submerged aquatic weeds on the hydraulic performance of branched open channel system with two different hydraulic structures

  4. Test Objectives for the Saltcake Dissolution Retrieval Demonstration

    International Nuclear Information System (INIS)

    DEFIGH PRICE, C.

    2000-01-01

    This document describes the objectives the Saltcake Dissolution Retrieval Demonstration. The near term strategy for single-shell tank waste retrieval activities has shifted from focusing on maximizing the number of tanks entered for retrieval (regardless of waste volume or content) to a focus on scheduling the retrieval of wastes from those single-shell tanks with a high volume of contaminants of concern. These contaminants are defined as mobile, long-lived radionuclides that have a potential of reaching the groundwater and the Columbia River. This strategy also focuses on the performance of key retrieval technology demonstrations, including the Saltcake Dissolution Retrieval Demonstration, in a variety of waste forms and tank farm locations to establish a technical basis for future work. The work scope will also focus on the performance of risk assessment, retrieval performance evaluations (RPE) and incorporating vadose zone characterization data on a tank-by-tank basis, and on updating tank farm closure/post closure work plans. The deployment of a retrieval technology other than Past-Practice Sluicing (PPS) allows determination of limits of technical capabilities, as well as, providing a solid planning basis for future SST retrievals. This saltcake dissolution technology deployment test will determine if saltcake dissolution is a viable retrieval option for SST retrieval. CH2M Hill Hanford Group (CHG) recognizes the SST retrieval mission is key to the success of the River Protection Project (RPP) and the overall completion of the Hanford Site cleanup. The objectives outlined in this document will be incorporated into and used to develop the test and evaluation plan for saltcake dissolution retrievals. The test and evaluation plan will be developed in fiscal year 2001

  5. Houdini{trademark}: Reconfigurable in-tank mobile robot. Final report, June 1995--January 1997

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, B.; Slifko, A.

    1998-12-31

    This report details the development of a reconfigurable in-tank robotic cleanup system called Houdini{trademark}. Driven by the general need to develop equipment for the removal of radioactive waste from hundreds of DOE waste storage tanks and the specific needs of DOE sites such as Oak Ridge National Laboratory and Fernald, Houdini{trademark} represents one of the possible tools that can be used to mobilize and retrieve this waste material for complete remediation. Houdini{trademark} is a hydraulically powered, track driven, mobile work vehicle with a collapsible frame designed to enter underground or above ground waste tanks through existing 24 inch riser openings. After the vehicle has entered the waste tank, it unfolds and lands on the waste surface or tank floor to become a remotely operated mini-bulldozer. Houdini{trademark} utilizes a vehicle mounted plow blade and 6-DOF manipulator to mobilize waste and carry other tooling such as sluicing pumps, excavation buckets, and hydraulic shears. The complete Houdini{trademark} system consists of the tracked vehicle and other support equipment (e.g., control console, deployment system, hydraulic power supply, and controller) necessary to deploy and remotely operate this system at any DOE site. Inside the storage tanks, the system is capable of performing heel removal, waste mobilization, waste size reduction, and other tank waste retrieval and decommissioning tasks. The first Houdini{trademark} system was delivered on September 24, 1996 to Oak Ridge National Laboratory (ORNL). The system acceptance test was successfully performed at a cold test facility at ORNL. After completion of the cold test program and the training of site personnel, ORNL will deploy the system for clean-up and remediation of the Gunite storage tanks.

  6. HOUDINI: RECONFIGURABEL IN-TANK ROBOT

    International Nuclear Information System (INIS)

    Bruce Thompson; Adam Slifko

    1997-01-01

    This report details the development of a reconfigurable in-tank robotic cleanup systems called Houdini(trademark). Driven by the general need to develop equipment for the removal of radioactive waste from hundreds of DOE waste storage tanks and the specific needs of DOE sites such as Oak Ridge National Laboratory and Fernald, Houdini(trademark) represents one of the possible tools that can be used to mobilize and retrieve this waste material for complete remediation. Houdini(trademark) is a hydraulically powered, track driven, mobile work vehicle with a collapsible frame designed to enter underground or above ground waste tanks through existing 24 inch riser openings. After the vehicle has entered the waste tank, it unfolds and lands on the waste surface or tank floor to become a remotely operated mini-bulldozer. Houdini(trademark) utilizes a vehicle mounted plow blade and 6-DOF manipulator to mobile waste and carry other tooling such as sluicing pumps, excavation buckets, and hydraulic shears. The complete Houdini(trademark) system consists of the tracked vehicle and other support equipment (e.g., control console, deployment system, hydraulic power supply, and controller) necessary to deploy and remotely operate this system at any DOE site. Inside the storage tanks, the system is capable of performing heel removal, waste mobilization, waste size reduction, and other tank waste retrieval and decommissioning tasks. The first Houdini(trademark) system was delivered on September 24, 1996 to Oak Ridge National Laboratory (ORNL). The system acceptance test was successfully performed at a cold test facility at ORNL. After completion of the cold test program and the training of site personnel, ORNL will deploy the system for clean-up and remediation of the Gunite storage tanks

  7. Biopolitics problems of large-scale hydraulic engineering construction

    International Nuclear Information System (INIS)

    Romanenko, V.D.

    1997-01-01

    The XX century which will enter in a history as a century of large-scale hydraulic engineering constructions come to the finish. Only on the European continent 517 large reservoirs (more than 1000 million km 3 of water were detained, had been constructed for a period from 1901 till 1985. In the Danube basin a plenty for reservoirs of power stations, navigations, navigating sluices and other hydraulic engineering structures are constructed. Among them more than 40 especially large objects are located along the main bed of the river. A number of hydro-complexes such as Dnieper-Danube and Gabcikovo, Danube-Oder-Labe (project), Danube-Tissa, Danube-Adriatic Sea (project), Danube-Aegean Sea, Danube-Black Sea ones, are entered into operation or are in a stage of designing. Hydraulic engineering construction was especially heavily conducted in Ukraine. On its territory some large reservoirs on Dnieper and Yuzhny Bug were constructed, which have heavily changed the hydrological regime of the rivers. Summarised the results of river systems regulating in Ukraine one can be noted that more than 27 thousand ponds (3 km 3 per year), 1098 reservoirs of total volume 55 km 3 , 11 large channels of total length more than 2000 km and with productivity of 1000 m 2 /s have been created in Ukraine. Hydraulic engineering construction played an important role in development of the industry and agriculture, water-supply of the cities and settlements, in environmental effects, and maintenance of safe navigation in Danube, Dnieper and other rivers. In next part of the paper, the environmental changes after construction of the Karakum Channel on the Aral Sea in the Middle Asia are discussed

  8. Strategies for redundancy resolution of dual-arm systems with passive elements for tank waste removal

    Energy Technology Data Exchange (ETDEWEB)

    Dubey, R. [Univ. of Tennessee, Knoxville, TN (United States). Dept. of Mechanical Engineering; Love, L.J. [Oak Ridge Inst. for Science and Education, TN (United States)

    1997-03-01

    The work described in this paper focuses on the coordination and control of two manipulators coupled by passive elements operating in a confined space. An example of one such system is the hardware used for the environmental response treatability study funded by the Department of Energy at Oak Ridge National Laboratory (ORNL). The motivation for this project is to establish the methodology necessary to extract large volumes of hazardous waste from underground storage facilities. The hardware used at ORNL consists of two long-reach manipulators. The first robot, the Modified Light Duty Utility Arm (MLDUA), is an 8-degree-of-freedom long-reach manipulator. The second arm, the Hose Management Arm (HMA), has two active degrees-of-freedom and provides hardware to break up and extract materials from the tank. Current strategies call for the MLDUA to grasp a combined sluicing end-effector attached, by a long flexible hose, to the HMA. The MLDUA will then move the combined system through the waste, extracting material. This paper describes many of the issues related to redundancy resolution and the coordinated control of these two robots. First, the authors provide a brief outline of the project and the existing hardware. This is followed by a description of existing redundancy resolution techniques and the impact redundancy has on the success of the project. Finally, preliminary simulation results show the effect cooperative control has on the level of forces generated between the dual-arm systems when coupled by an elastic exhaust hose. These results show a significant reduction in forces when both arms are active and have a combined manipulation strategy.

  9. Waste sludge resuspension and transfer: development program

    International Nuclear Information System (INIS)

    Weeren, H.O.; Mackey, T.S.

    1980-02-01

    The six Gunite waste tanks at Oak Ridge National Laboratory (ORNL) contain about 400,000 gal of sludge that has precipitated from solution and settled during the 35 years these tanks have been in service. Eventual decommissioning of the tanks has been proposed. The first part of this program is to resuspend the accumulated sludge, to transfer it to new storage tanks in Melton Valley, and to dispose of it by the shale-fracturing process. On the basis of preliminary information, a tentative operational concept was adopted. The sludge in each tank would be resuspended by hydraulic sluicing and pumped from the tank. This resuspended sludge would be treated as necessary to keep the particles in suspension and would be pumped to the new waste-storage tanks. Subsequently the sludge would be pumped from the tanks, combined with a cement-base mix, and disposed of by the shale-fracturing facility. Verification of the feasibility of this concept required development effort on characterization of the sludge and development of techniques for resuspending the sludge and for keeping it in suspension. These development efforts are described in this report. Sections of the report describe both the known properties of the sludge and the tests of grinding methods investigated, discuss tests of various suspenders, describe tests with cement-base mixes, summarize hot-cell tests on actual sludge samples, and describe tests that were made at a mockup of a Gunite tank installation. On the basis of the tests made, it was concluded that reslurrying and resuspension of the sludge is quite feasible and that the suspensions can be made compatible with cement mixes

  10. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 2 [of 2

    International Nuclear Information System (INIS)

    Lewis, BE

    2003-01-01

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and ∼420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. Volume 1 provides information on the various phases of the project and describes the types of equipment used. Volume 1 also discusses the tank waste retrieval performance and the lessons learned during the remediation effort. Volume 2 consists of the following appendixes, which are referenced in Vol. 1: A--Background Information for the Gunite and Associated Tanks Operable Unit; B--Annotated Bibliography; C--GAAT Equipment Matrix; D--Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; and E--Vendor List for the GAAT Remediation Project. The remediation of the GAATs was completed ∼5.5 years ahead of schedule and ∼$120,435K below the cost estimated in the Remedial Investigation/Feasibility Study for the project. These schedule and cost savings were a direct result of the selection and use of state-of-the-art technologies and the dedication and drive of the engineers, technicians, managers, craft workers, and support personnel that made up the GAAT Remediation Project Team

  11. Regulatory analysis for the use of underground barriers at the Hanford Site tank farms

    International Nuclear Information System (INIS)

    Hampsten, K.L.

    1994-01-01

    Sixty-seven of the single-shell tanks at the Hanford Site, Richland, Washington, are assumed to have leaked in the past. Some of the waste retrieval options being considered, such as past-practice sluicing (a process that uses hot water to dislodge waste for subsequent removal by pumping), have the potential for increasing releases of dangerous waste from these tanks. Underground barrier systems are being evaluated as a method to mitigate releases of tank waste to the soil and groundwater that may occur during retrieval activities. The following underground barrier system options are among those being evaluated to determine whether their construction at the Single-Shell Tank Farms is viable. (1) A desiccant barrier would be created by circulating air through the subsurface soil to lower and then maintain the water saturation below the levels required for liquids to flow. (2) An injected materials barrier would be created by injecting materials such as grout or silica into the subsurface soils to form a barrier around and under a given tank or tank farm. (3) A cryogenic barrier would be created by freezing subsurface soils in the vicinity of a tank or tank farm. An analysis is provided of the major regulatory requirements that may impact full scale construction and operation of an underground barrier system and a discussion of factors that should be considered throughout the barrier selection process, irrespective of the type of underground barrier system being considered. However, specific barrier systems will be identified when a given regulation will have significant impact on a particular type of barrier technology. Appendix A provides a matrix of requirements applicable to construction and operation of an underground barrier system

  12. Engineering development of a lightweight high-pressure scarifier for tank waste retrieval

    Energy Technology Data Exchange (ETDEWEB)

    Hatchell, B.K.

    1997-09-01

    The Retrieval Process Development and Enhancements Program (RPD&E) is sponsored by the U.S. Department of Energy Tanks Focus Area to investigate existing and emerging retrieval processes suitable for the retrieval of high-level radioactive waste inside underground storage tanks. This program, represented by industry, national laboratories, and academia, seeks to provide a technical and cost basis to support site-remediation decisions. Part of this program has involved the development of a high-pressure waterjet dislodging system and pneumatic conveyance integrated as a scarifier. Industry has used high-pressure waterjet technology for many years to mine, cut, clean, and scarify materials with a broad range of properties. The scarifier was developed as an alternate means of retrieving waste inside Hanford single-shell tanks, particularly hard, stubborn waste. Testing of the scarifier has verified its ability to retrieve a wide range of tank waste ranging from extremely hard waste that is resistant to other dislodging means to soft sludge and even supernatant fluid. Since the scarifier expends water at a low rate and recovers most of the water as it is used, the scarifier is well suited for retrieval of tanks that leak and cannot be safely sluiced or applications where significant waste dilution is not acceptable. Although the original scarifier was effective, it became evident that a lighter, more compact version that would be compatible with light weight deployment systems under development, such as the Light Duty Utility Arm, was needed. At the end of FY 95, the Light Weight Scarifier (LWS) was designed to incorporate the features of the original scarifier in a smaller, lighter end effector. During FY 96, the detailed design of the LWS was completed and two prototypes were fabricated.

  13. Licensing strategy for deployment of commercial technologies procured through a service contract in DOE-owned facilities

    International Nuclear Information System (INIS)

    Bloom, J.W.

    1998-01-01

    The US Department of Energy's Hanford Tank Farm Remediation System (TWRS) is responsible for the safe storage of waste in 177 underground waste storage tanks. TWRS is also responsible for the cleanup and final closure of these tanks. In the performance of this mission TWRS has historically designed its own equipment. The safety of the equipment for deployment in TWRS facilities has been assured through the development of detailed engineering specifications and close QA/QC monitoring during fabrication and testing. In order to address the complex and costly cleanup mission Hanford is looking for ways to apply private sector technologies to the cleanup mission. The Hanford Tanks Initiative (HTI) is a five year, EM 30/50 expense-funded project with a primary objective of demonstrating the extent to which the Hanford Tank Waste Remediation System (TWRS) tanks can be cleaned using commercially available technologies. To accomplish this objective, in August 1996 HTI issued a Request for Proposal (RFP) for services to remove the hard heel waste from tank 241-C-106, following retrieval of the majority of the waste by sluicing. While certain specification guidance was provided in the RFP such as, must be capable of operation in a flammable gas environment, the RFP was careful in avoiding language that would place limitations on the technologies that industry could provide. The challenge for HTI was to develop a licensing strategy that would provide maximum flexibility to the technology vendors while meeting the stringent documentation requirements of the US Department of Energy (DOE). This strategy must also provide assurance that the technology can be shown to be within the TWRS authorization basis and be safely deployed. A 35-step process (Figure 1) was developed by HTI to accomplish this objective

  14. Engineering development of a lightweight high-pressure scarifier for tank waste retrieval

    International Nuclear Information System (INIS)

    Hatchell, B.K.

    1997-09-01

    The Retrieval Process Development and Enhancements Program (RPD ampersand E) is sponsored by the U.S. Department of Energy Tanks Focus Area to investigate existing and emerging retrieval processes suitable for the retrieval of high-level radioactive waste inside underground storage tanks. This program, represented by industry, national laboratories, and academia, seeks to provide a technical and cost basis to support site-remediation decisions. Part of this program has involved the development of a high-pressure waterjet dislodging system and pneumatic conveyance integrated as a scarifier. Industry has used high-pressure waterjet technology for many years to mine, cut, clean, and scarify materials with a broad range of properties. The scarifier was developed as an alternate means of retrieving waste inside Hanford single-shell tanks, particularly hard, stubborn waste. Testing of the scarifier has verified its ability to retrieve a wide range of tank waste ranging from extremely hard waste that is resistant to other dislodging means to soft sludge and even supernatant fluid. Since the scarifier expends water at a low rate and recovers most of the water as it is used, the scarifier is well suited for retrieval of tanks that leak and cannot be safely sluiced or applications where significant waste dilution is not acceptable. Although the original scarifier was effective, it became evident that a lighter, more compact version that would be compatible with light weight deployment systems under development, such as the Light Duty Utility Arm, was needed. At the end of FY 95, the Light Weight Scarifier (LWS) was designed to incorporate the features of the original scarifier in a smaller, lighter end effector. During FY 96, the detailed design of the LWS was completed and two prototypes were fabricated

  15. Oak Ridge National Laboratory Old Hydrofracture Facility Waste Remediation Using the Borehole-Miner Extendible-Nozzle Sluicer

    Energy Technology Data Exchange (ETDEWEB)

    Bamberger, J.A.; Boris, G.F.

    1999-10-07

    A borehole-miner extendible-nozzle sluicing system was designed, constructed, and deployed at Oak Ridge National Laboratory to remediate five horizontal underground storage tanks containing sludge and supernate at the ORNL Old Hydrofracture Facility site. The tanks were remediated in fiscal year 1998 to remove {approx}98% of the waste, {approx}3% greater than the target removal of >95% of the waste. The tanks contained up to 18 in. of sludge covered by supernate. The 42,000 gal of low level liquid waste were estimated to contain 30,000 Ci, with 97% of this total located in the sludge. The retrieval was successful. At the completion of the remediation, the State of Tennessee Department of Environment and Conservation agreed that the tanks were cleaned to the maximum extent practicable using pumping technology. This deployment was the first radioactive demonstration of the borehole-miner extendible-nozzle water-jetting system. The extendible nozzle is based on existing bore hole-miner technology used to fracture and dislodge ore deposits in mines. Typically borehole-miner technology includes both dislodging and retrieval capabilities. Both dislodging, using the extendible-nozzle water-jetting system, and retrieval, using a jet pump located at the base of the mast, are deployed as an integrated system through one borehole or riser. Note that the extendible-nozzle system for Oak Ridge remediation only incorporated the dislodging capability; the retrieval pump was deployed through a separate riser. The borehole-miner development and deployment is part of the Retrieval Process Development and Enhancements project under the direction of the US Department of Energy's EM-50 Tanks Focus Area. This development and deployment was conducted as a partnership between RPD and E and the Oak Ridge National Laboratory's US DOE EM040 Old Hydrofracture Facility remediation project team.

  16. Licensing strategy for deployment of commercial technologies procured through a service contract in DOE-owned facilities

    Energy Technology Data Exchange (ETDEWEB)

    Bloom, J.W.

    1998-05-05

    The US Department of Energy`s Hanford Tank Farm Remediation System (TWRS) is responsible for the safe storage of waste in 177 underground waste storage tanks. TWRS is also responsible for the cleanup and final closure of these tanks. In the performance of this mission TWRS has historically designed its own equipment. The safety of the equipment for deployment in TWRS facilities has been assured through the development of detailed engineering specifications and close QA/QC monitoring during fabrication and testing. In order to address the complex and costly cleanup mission Hanford is looking for ways to apply private sector technologies to the cleanup mission. The Hanford Tanks Initiative (HTI) is a five year, EM 30/50 expense-funded project with a primary objective of demonstrating the extent to which the Hanford Tank Waste Remediation System (TWRS) tanks can be cleaned using commercially available technologies. To accomplish this objective, in August 1996 HTI issued a Request for Proposal (RFP) for services to remove the hard heel waste from tank 241-C-106, following retrieval of the majority of the waste by sluicing. While certain specification guidance was provided in the RFP such as, must be capable of operation in a flammable gas environment, the RFP was careful in avoiding language that would place limitations on the technologies that industry could provide. The challenge for HTI was to develop a licensing strategy that would provide maximum flexibility to the technology vendors while meeting the stringent documentation requirements of the US Department of Energy (DOE). This strategy must also provide assurance that the technology can be shown to be within the TWRS authorization basis and be safely deployed. A 35-step process (Figure 1) was developed by HTI to accomplish this objective.

  17. Evaluation of operating characteristics for a chabazite zeolite system for treatment of process wastewater at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Kent, T.E.; Perona, J.J.; Jennings, H.L.; Lucero, A.J.; Taylor, P.A.

    1998-02-01

    Laboratory and pilot-scale testing were performed for development and design of a chabazite zeolite ion-exchange system to replace existing treatment systems at the Process Waste Treatment Plant (PWTP) at Oak Ridge National Laboratory (ORNL). The process wastewater treatment systems at ORNL need upgrading to improve efficiency, reduce waste generation, and remove greater quantities of contaminants from the wastewater. Previous study indicated that replacement of the existing PWTP systems with an ion-exchange system using chabazite zeolite will satisfy these upgrade objectives. Pilot-scale testing of the zeolite system was performed using a commercially available ion-exchange system to evaluate physical operating characteristics and to validate smaller-scale column test results. Results of this test program indicate that (1) spent zeolite can be sluiced easily and completely from a commercially designed vessel, (2) clarification followed by granular anthracite prefilters is adequate pretreatment for the zeolite system, and (3) the length of the mass transfer zone was comparable with that obtained in smaller-scale column tests. Laboratory studies were performed to determine the loading capacity of the zeolite for selected heavy metals. These test results indicated fairly effective removal of silver, cadmium, copper, mercury, nickel, lead, and zinc from simple water solutions. Heavy-metals data collected during pilot-scale testing of actual wastewater indicated marginal removal of iron, copper, and zinc. Reduced effectiveness for other heavy metals during pilot testing can be attributed to the presence of interfering cations and the relatively short zeolite/wastewater contact time. Flocculating agents (polyelectrolytes) were tested for pretreatment of wastewater prior to the zeolite flow-through column system. Several commercially available polyelectrolytes were effective in flocculation and settling of suspended solids in process wastewater

  18. Environmental data for the White Oak Creek/White Oak Lake watershed: Environmental Sciences Division publication No. 2779

    International Nuclear Information System (INIS)

    Sherwood, C.B.; Loar, J.M.

    1987-01-01

    Oak Ridge National Laboratory (ORNL) is located in the White Oak Creek (WOC) watershed, which drains approximately 16.8 km 2 (6.5 mile 2 ). The waters of WOC are impounded by White Oak Dam at WOC's intersection with White Wing Road (State Route 95), 1.0 km (0.6 mile) upstream from the Clinch River. The resulting White Oak Lake (WOL) is a small, shallow impoundment, whose water level is controlled by a vertical sluice gate that remains in a fixed position during normal operations. White Oak Creek has been utilized for the discharge of treated and untreated wastes from routine operations since the Laboratory's inception. In addition, most of the more recent (1954 to date) liquid and solid low-level-waste disposal operations have been located in the drainage area of WOC. As a federally owned facility, ORNL is required to comply with all existing federal, state, and local environmental regulations regarding waste management. On July 15, 1985, the US Environmental Protection Agency published final rules to incorporate changes in the Resource Conservation and Recovery Act of 1976 that resulted from the passage of the Hazardous and Solid Waste Amendments of 1984. As a part of the rule changes, a new Sect. 3004(u) was added. The new section requires that any facility permit issued after November 8, 1984, include planned corrective actions for all continuing releases of hazardous waste or constituents from any disposal unit at the facility, regardless of when the waste was placed at the disposal unit. This report was prepared to compile existing information on the content and quantity of hazardous substances (both radioactive and nonradioactive) in the WOC/WOL watershed and to provide background information on the geology, hydrology, and ecology of the site for use in planning future remedial actions. 109 refs., 45 figs., 33 tabs

  19. Atmospheric emission of mercury due to combustion of steam coal and domestic coal in China

    Science.gov (United States)

    Wang, Shaobin; Luo, Kunli

    2017-08-01

    To study the mercury emission due to the combustion of steam coal and domestic coal in China, we analyzed the mercury contents of coal, fly ash, bottom ash and sluicing water in thermal power plants, steam boilers as well as domestic coal-stoves, in Shaanxi, Shanxi, Shandong and Yunnan Provinces. This study conduct an estimate of the Hg emission rates from steam coal and domestic coal combustion based on the method of mass distribution ratio of fly ash and bottom ash. The results show that the Hg emission rate of coal combustion in thermal power plants is about 50.21% (electrostatic precipitators + wet flue gas desulfurization), and that in heating boilers is about 67.23%, and 92.28% in industrial boilers without flue gas desulphurisation equipment. Furthermore, Hg emission rate is 83.61% due to domestic coal combustion in coal-stoves. The Hg emission amount into the atmosphere from power and heat generation, industrial boilers, domestic coal-stoves and spontaneous combustion of coal gangue is roughly estimated to be 133 ± 4, 100 ± 17, 11 ± 0.1 and 47 ± 26 tons in China in 2014, respectively, and the total Hg emission amount from this paper is estimated at 292 tons. The trends of Hg emission in China from 1991 to 2014 show an accelerating growth after 2002. The proportion of mercury emission due to thermal power, heating generation and industrial energy utilization continuously increased. The atmospheric emission of mercury due to combustion of steam coal, domestic coal and coal gangue accounts nearly 50% in total anthropogenic Hg emissions in China, indicating one of the largest sources of Hg emission in China which should draw more public and scientific attention in the future.

  20. Oak Ridge National Laboratory Old Hydrofracture Facility Waste Remediation Using the Borehole-Miner Extendible-Nozzle Sluicer

    International Nuclear Information System (INIS)

    Boris, G.F.; Bamberger, J.A.

    1999-01-01

    A borehole-miner extendible-nozzle sluicing system was designed, constructed, and deployed at Oak Ridge National Laboratory to remediate five horizontal underground storage tanks containing sludge and supernate at the ORNL Old Hydrofracture Facility site. The tanks were remediated in fiscal year 1998 to remove approximately98% of the waste, approximately3% greater than the target removal of >95% of the waste. The tanks contained up to 18 in. of sludge covered by supernate. The 42,000 gal of low level liquid waste were estimated to contain 30,000 Ci, with 97% of this total located in the sludge. The retrieval was successful. At the completion of the remediation, the State of Tennessee Department of Environment and Conservation agreed that the tanks were cleaned to the maximum extent practicable using pumping technology. This deployment was the first radioactive demonstration of the borehole-miner extendible-nozzle water-jetting system. The extendible nozzle is based on existing borehole-miner technology used to fracture and dislodge ore deposits in mines. Typically borehole-miner technology includes both dislodging and retrieval capabilities. Both dislodging, using the extendible-nozzle water-jetting system, and retrieval, using a jet pump located at the base of the mast, are deployed as an integrated system through one borehole or riser. Note that the extendible-nozzle system for Oak Ridge remediation only incorporated the dislodging capability; the retrieval pump was deployed through a separate riser. The borehole-miner development and deployment is part of the Retrieval Process Development and Enhancements project under the direction of the US Department of Energy's EM-50 Tanks Focus Area. This development and deployment was conducted as a partnership between RPD and E and the Oak Ridge National Laboratory's US DOE EM040 Old Hydrofracture Facility remediation project team

  1. Environmental data for the White Oak Creek/White Oak Lake watershed: Environmental Sciences Division publication No. 2779

    Energy Technology Data Exchange (ETDEWEB)

    Sherwood, C.B.; Loar, J.M.

    1987-01-01

    Oak Ridge National Laboratory (ORNL) is located in the White Oak Creek (WOC) watershed, which drains approximately 16.8 km/sup 2/ (6.5 mile/sup 2/). The waters of WOC are impounded by White Oak Dam at WOC's intersection with White Wing Road (State Route 95), 1.0 km (0.6 mile) upstream from the Clinch River. The resulting White Oak Lake (WOL) is a small, shallow impoundment, whose water level is controlled by a vertical sluice gate that remains in a fixed position during normal operations. White Oak Creek has been utilized for the discharge of treated and untreated wastes from routine operations since the Laboratory's inception. In addition, most of the more recent (1954 to date) liquid and solid low-level-waste disposal operations have been located in the drainage area of WOC. As a federally owned facility, ORNL is required to comply with all existing federal, state, and local environmental regulations regarding waste management. On July 15, 1985, the US Environmental Protection Agency published final rules to incorporate changes in the Resource Conservation and Recovery Act of 1976 that resulted from the passage of the Hazardous and Solid Waste Amendments of 1984. As a part of the rule changes, a new Sect. 3004(u) was added. The new section requires that any facility permit issued after November 8, 1984, include planned corrective actions for all continuing releases of hazardous waste or constituents from any disposal unit at the facility, regardless of when the waste was placed at the disposal unit. This report was prepared to compile existing information on the content and quantity of hazardous substances (both radioactive and nonradioactive) in the WOC/WOL watershed and to provide background information on the geology, hydrology, and ecology of the site for use in planning future remedial actions. 109 refs., 45 figs., 33 tabs.

  2. Technical safety requirements for the South Tank Farm remediation project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Platfoot, J.H.

    1999-01-01

    The South Tank Farm (STF) is a series of six, 170,000-gal underground, domed storage tanks that were placed into service in 1943. The tanks were constructed of a concrete mixture known as gunite. They were used as a portion of the Liquid LOW-LEVEL WASTE (LLW) System for the collection, neutralization, storage, and transfer of the aqueous portion of the radioactive and/or hazardous chemical wastes produced as part of normal facility operations at Oak Ridge National Laboratory (ORNL). Although the last of the tanks was taken out of service in 1986, they have been shown by structural analysis to continue to be structurally sound. An attempt was made in 1983 to empty the tanks; however, removal of all the sludge from the tanks was not possible with the equipment and schedule available. Since removal of the liquid waste in 1983, liquid continues to accumulate within the tanks. The in-leakage is believed to be the result of groundwater dripping into the tanks around penetrations in the domes. The tanks are currently being maintained under a Surveillance and Maintenance Program, which includes activities such as level monitoring, vegetation control, High Efficiency Particulate Air filter leakage requirement testing/replacement, sign erection/repair, pump-out of excess liquids, and instrument calibration/maintenance. A technique known as confined sluicing, which uses a high-pressure, low-volume water jet integrated with a jet pump, will be used to remove the sludge. The Technical Safety Requirements (TSRs) are those operational requirements that specify the operating limits and surveillance requirements, the basis thereof, safety boundaries, and the management of administrative controls necessary to ensure the safe operation of the STF remediation project. Effective implementation of TSRs will limit to acceptable levels the risks to the public and workers from uncontrolled releases of radioactive or other hazardous material

  3. Widespread infilling of tidal channels and navigable waterways in human-modified tidal deltaplain of southwest Bangladesh

    Directory of Open Access Journals (Sweden)

    Carol Wilson

    2017-12-01

    Full Text Available Since the 1960s, ~5000 km2 of tidal deltaplain in southwest Bangladesh has been embanked and converted to densely inhabited, agricultural islands (i.e., polders. This landscape is juxtaposed to the adjacent Sundarbans, a pristine mangrove forest, both well connected by a dense network of tidal channels that effectively convey water and sediment throughout the region. The extensive embanking in poldered areas, however, has greatly reduced the tidal prism (i.e., volume of water transported through local channels. We reveal that >600 km of these major waterways have infilled in recent decades, converting to land through enhanced sedimentation and the direct blocking of waterways by embankments and sluice gates. Nearly all of the observed closures (~98% have occurred along the embanked polder systems, with no comparable changes occurring in channels of the Sundarbans (<2% change. We attribute most of the channel infilling to the local reduction of tidal prism in poldered areas and the associated decline in current velocities. The infilled channels account for ~90 km2 of new land in the last 40–50 years, the rate of which, ~2 km2/yr, offsets the 4 km2/yr that is eroded at the coast, and is equivalent to ~20% of the new land produced naturally at the Ganges-Brahmaputra tidal rivermouth. Most of this new land, called ‘khas’ in Bengali, has been reclaimed for agriculture or aquaculture, contributing to the local economy. However, benefits are tempered by the loss of navigable waterways for commerce, transportation, and fishing, as well as the forced rerouting of tidal waters and sediments necessary to sustain this low-lying landscape against rising sea level. A more sustainable delta will require detailed knowledge of the consequences of these hydrodynamic changes to support more scientifically-grounded management of water, sediment, and tidal energy distribution.

  4. Residual circulation and suspended sediment transport in the Dutch Wadden Sea

    Science.gov (United States)

    Duran-Matute, Matias; Sassi, Maximiliano; de Boer, Gerben; Grawë, Ulf; Gerkema, Theo; van Kessel, Thijs; Cronin, Katherine

    2014-05-01

    The Dutch Wadden Sea (DWS), situated between continental Europe and the Dutch Wadden Islands, is a semi enclosed basin connected to the North Sea by a series of tidal inlets and composed mainly of tidal flats and sea gullies. The DWS is of high ecological importance due to its biodiversity and has been declared a World Heritage site by UNESCO. It is a dynamic area subject to regional relative sea level rise due to global sea level rise, postglacial rebound and gas exploitation. For intertidal areas to continue to serve as feeding ground for migratory birds, a net import of sediment is required. Observations are crucial but provide only scarce information in space and time. Hence, to estimate the net influx of suspended sediment into the DWS, realistic high resolution three-dimensional numerical simulations have been carried out using the General Estuarine Transport Model (GETM). The hydrodynamics are mainly governed by the tides, the fresh water discharge from several sluices into the DWS and wind variability. It is expected that the transport of suspended particulate matter (SPM) is governed by the same factors, too, in combination with sediment sink and source terms. For validation, the results are compared against different observational data sets, such as tidal gauges, temperature and salinity at a fixed station, and the volumetric flux rate through one of the inlets obtained from an acoustic Doppler current profiler (ADCP) attached to a ferry. SPM transport is modeled for four different sediment classes each of which is defined by the critical shear stress and the settling velocity. Results show a clear net import of SPM through one of the inlets, which is in agreement with the observations. First estimates of the total sediment fluxes through the different inlets are presented together with an analysis on their variability and sensibility to the external forcing. Of particular importance is the net export of SPM during storms as well as the role of storms on

  5. Societal impacts and vulnerability to floods in Bangladesh and Nepal

    Directory of Open Access Journals (Sweden)

    Tanvir H. Dewan

    2015-03-01

    Full Text Available Bangladesh and Nepal lie between the Himalayas and low-lying coasts of the Bay of Bengal and are traversed by hundreds of rivers and tributaries. Historical data shows that, since 1970, the scale, intensity and duration of floods have increased in Bangladesh and Nepal, causing grave human suffering; disruptions in normal life and activity, damages of infrastructure, crops and agricultural land with severe impacts on the economy. Bangladesh is affected by torrential rain, glacier melt, upstream water flow and tidal surges. In 1988, Bangladesh experienced one of the most severe floods of the twentieth century which aroused significant concern internationally and triggered the Bangladesh Action Plan for Flood Control. The Government of Bangladesh (GOB has so far constructed a number of flood shelters and carried out 482 water and flood control projects involving flood protection embankments, drainage channels, sluice gates and regulators on different rivers and canals. These also provided safety measures against inundation by tidal waves, storm-surges and flooding. The Terai region of Nepal is highly prone to hydrological risks including torrential rain, floods, glaciers resulting in erosion and landslides. The Government of Nepal (GON has implemented different mitigation measures mainly early warning awareness, rescue measure, relief, and post-flood rehabilitation programs etc. Disaster Management Bureaus of both the countries have already conducted many trainings, workshops and seminars to disseminate scientific knowledge and coping up practices to disaster managers and to create public awareness. Besides the contemporary approaches to mitigating flood effects, people of these countries have coped with floods through generations relying on traditional/indigenous knowledge and other local adaptation practices. It is crucial that along with scientific process, indigenous, traditional and conventional practices are to be integrated for a national

  6. Evaluating sustainable adaptation strategies for vulnerable mega-deltas using system dynamics modelling: Rice agriculture in the Mekong Delta's An Giang Province, Vietnam.

    Science.gov (United States)

    Chapman, Alexander; Darby, Stephen

    2016-07-15

    Challenging dynamics are unfolding in social-ecological systems around the globe as society attempts to mitigate and adapt to climate change while sustaining rapid local development. The IPCC's 5th assessment suggests these changing systems are susceptible to unforeseen and dangerous 'emergent risks'. An archetypal example is the Vietnamese Mekong Delta (VMD) where the river dyke network has been heightened and extended over the last decade with the dual objectives of (1) adapting the delta's 18 million inhabitants and their livelihoods to increasingly intense river-flooding, and (2) developing rice production through a shift from double to triple-cropping. Negative impacts have been associated with this shift, particularly in relation to its exclusion of fluvial sediment deposition from the floodplain. A deficit in our understanding of the dynamics of the rice-sediment system, which involve unintuitive delays, feedbacks, and tipping points, is addressed here, using a system dynamics (SD) approach to inform sustainable adaptation strategies. Specifically, we develop and test a new SD model which simulates the dynamics between the farmers' economic system and their rice agriculture operations, and uniquely, integrates the role of fluvial sediment deposition within their dyke compartment. We use the model to explore a range of alternative rice cultivation strategies. Our results suggest that the current dominant strategy (triple-cropping) is only optimal for wealthier groups within society and over the short-term (ca. 10years post-implementation). The model suggests that the policy of opening sluice gates and leaving paddies fallow during high-flood years, in order to encourage natural sediment deposition and the nutrient replenishment it supplies, is both a more equitable and a more sustainable policy. But, even with this approach, diminished supplies of sediment-bound nutrients and the consequent need to compensate with artificial fertilisers will mean that smaller

  7. SIGNIFICANT PROGRESS IN THE DEPLOYMENT OF NEW TECHNOLOGIES FOR THE RETRIEVAL OF HANFORD RADIOACTIVE WASTE STORAGE TANKS

    International Nuclear Information System (INIS)

    RAYMOND RE; DODD RA; CARPENTER KE; STURGES MH

    2008-01-01

    Significant enhancements in the development and deployment of new technologies for removing waste from storage tanks at the Hanford Site have resulted in accelerated progress and reduced costs for tank cleanup. CH2M HILL Hanford Group, Inc. is the U.S. Department of Energy, Office of River Protection's prime contractor responsible for safely storing and retrieving approximately 53 million gallons of highly-radioactive and hazardous waste stored in 177 underground tanks. The waste is stored in 149 older single-shell tanks (SST) and 28 newer double-shell tanks (DST) that are grouped in 18 so-called farms near the center of the Hanford Site, located in southeastern Washington State. Tank contents include materials from years of World-War II and post-war weapons production, which account for 60 percent by volume of the nation's high-level radioactive waste. A key strategy for improved cleanup is the development and deployment of innovative technologies, which enhance worker safety, resolve technical challenges, streamline retrieval processes, and cut project costs and durations. During the past seven years of tank cleanout projects we have encountered conditions and waste chemistry that defy conventional approaches, requiring a variety of new tools and techniques. Through the deployment of advanced technology and the creative application of resources, we are finding ways to accomplish the retrieval process safely, swiftly, and economically. To date, retrieval operations have been completed in seven tanks, including a record six tanks in a two-year period. Retrieval operations are in progress for another three tanks. This paper describes the following tank cleanup technologies deployed at Hanford in the past few years: Modified waste sluicing, High pressure water lance, Mobile retrieval tools, Saltcake dissolution, Vacuum retrieval, Sparging of wastes, Selective dissolution for waste treatment, Oxalic acid dissolution, High-pressure water mixers, Variable height pumps

  8. Downstream fish passage guide walls: A hydraulic scale model analysis

    Science.gov (United States)

    Mulligan, Kevin; Towler, Brett; Haro, Alexander J.; Ahlfeld, David P.

    2018-01-01

    Partial-depth guide walls are used to improve passage efficiency and reduce the delay of out-migrating anadromous fish species by guiding fish to a bypass route (i.e. weir, pipe, sluice gate) that circumvents the turbine intakes, where survival is usually lower. Evaluation and monitoring studies, however, indicate a high propensity for some fish to pass underneath, rather than along, the guide walls, compromising their effectiveness. In the present study we evaluated a range of guide wall structures to identify where/if the flow field shifts from sweeping (i.e. flow direction primarily along the wall and towards the bypass) to downward-dominant. Many migratory fish species, particularly juveniles, are known to drift with the flow and/or exhibit rheotactic behaviour during their migration. When these behaviours are present, fish follow the path of the flow field. Hence, maintaining a strong sweeping velocity in relation to the downward velocity along a guide wall is essential to successful fish guidance. Nine experiments were conducted to measure the three-dimensional velocity components upstream of a scale model guide wall set at a wide range of depths and angles to flow. Results demonstrated how each guide wall configuration affected the three-dimensional velocity components, and hence the downward and sweeping velocity, along the full length of the guide wall. In general, the velocities produced in the scale model were sweeping dominant near the water surface and either downward dominant or close to the transitional depth near the bottom of the guide wall. The primary exception to this shift from sweeping do downward flow was for the minimum guide wall angle tested in this study (15°). At 15° the flow pattern was fully sweeping dominant for every cross-section, indicating that a guide wall with a relatively small angle may be more likely to produce conditions favorable to efficient guidance. A critical next step is to evaluate the behaviour of migratory fish as

  9. W-320 Project thermal modeling

    Energy Technology Data Exchange (ETDEWEB)

    Sathyanarayana, K., Fluor Daniel Hanford

    1997-03-18

    This report summarizes the results of thermal analysis performed to provide a technical basis in support of Project W-320 to retrieve by sluicing the sludge in Tank 241-C-106 and to transfer into Tank 241-AY-102. Prior theraml evaluations in support of Project W-320 safety analysis assumed the availability of 2000 to 3000 CFM, as provided by Tank Farm Operations, for tank floor cooling channels from the secondary ventilation system. As this flow availability has no technical basis, a detailed Tank 241-AY-102 secondary ventilation and floor coating channel flow model was developed and analysis was performed. The results of the analysis show that only about 150 cfm flow is in floor cooLing channels. Tank 241-AY-102 thermal evaluation was performed to determine the necessary cooling flow for floor cooling channels using W-030 primary ventilation system for different quantities of Tank 241-C-106 sludge transfer into Tank 241-AY-102. These sludge transfers meet different options for the project along with minimum required modification of the ventilation system. Also the results of analysis for the amount of sludge transfer using the current system is presented. The effect of sludge fluffing factor, heat generation rate and its distribution between supernatant and sludge in Tank 241-AY-102 on the amount of sludge transfer from Tank 241-C-106 were evaluated and the results are discussed. Also transient thermal analysis was performed to estimate the time to reach the steady state. For a 2 feet sludge transfer, about 3 months time will be requirad to reach steady state. Therefore, for the purpose of process control, a detailed transient thermal analysis using GOTH Computer Code will be required to determine transient response of the sludge in Tank 241-AY-102. Process control considerations are also discussed to eliminate the potential for a steam bump during retrieval and storage in Tanks 241-C-106 and 241-AY-102 respectively.

  10. Overview of Remote Retrieval Equipment and the Strategy for removal of Radon Bearing Waste from Silos 1 and 2 at the Fernald Site

    International Nuclear Information System (INIS)

    Rinker, Michael W.; Samuel, Todd J.

    2001-01-01

    This document provides an overview of the remote retrieval equipment and strategy for the retrieval of waste from Silos 1 and 2 at the Department of Energy's Fernald site in southwestern Ohio. The scope of this paper is limited to general descriptions of remote equipment specifically related in-silo retrieval. The retrieval strategy describes how the contractor team is planning to utilize the various remote subsystems to efficiently remove the waste from the silos from a philosophical standpoint as opposed to a procedural and operational standpoint. The retrieval strategy and approach is based upon the successful tank retrieval operations conducted at DOE's Oak Ridge and Hanford Sites. Lessons learned from these previous operations have been utilized in planning an approach for the Fernald Silo Retrieval Project. The equipment overview includes discussion of the retrieval system configurations together with descriptions of the robotic arm and retrieval end effectors, the conditioning and transfer pumping system, the sluicer and sluicing pump, as well as the debris retrieval system. A unique challenge being addressed as part of this project is the waste contents. Silos 1 and 2 contain two distinct layers of material that need to be retrieved. The first layer is a Bentonite (trade name BentogroutTM) cap that was placed in the silos to prevent radon migration into the dome space and out of the silos. The Bentonite layer varies, but in general it is approximately six inches deep in the center of the silo and thirty-six inches near the silo walls. The material may have dried out on the surface, and may still be wetted near the bottom of the bentonite layer. The K-65 ore tailings, which were slurried into the silos, are the remainder of the waste that is over 20' in depth. This paper provides an overview of the retrieval strategies, technologies, and techniques that will be used to safely and efficiently retrieve the waste from the Fernald Silos

  11. A Century of changes for Razelm-Sinoe Lagoon System

    Science.gov (United States)

    Scrieciu, Marian-Albert; Stanica, Adrian

    2014-05-01

    A Century of changes for Razelm-Sinoe Lagoon System Marian-Albert Scrieciu (a), Adrian Stanica (a) (a) National Institute of Marine Geology and Geoecology e GeoEcoMar, Str. Dimitrie Onciul 23e25, Sector 2, 024053 Bucharest, Romania Razelm-Sinoe Lagoon System, situated in the NW part of the Black Sea, in tight connection with the Danube Delta, has been subject to major changes due to human interventions in the past century. These changes have resulted into a complete change of the Lagoon specific ecosystems compared to its pristine state. In its natural state, as brackish - transitional environment, Antipa (1894) mentions Razelm Lagoon as one of the places with the greatest fisheries around the Black Sea coast (about 1879 - 1884, there were approximately 10,000 fishermen, all working on the Razelm Sinoe Lagoon System). Starting with the end of the XIXth Century, new canals were dug and existing channels were dredged in order to develop tighter connections with the Danube River. The natural inlet of Portita was blocked four decades ago and connections between the various parts of the lagoon system were controlled by the building of locks and sluices. The 2 inlets of Sinoe Lagoon were also controlled during early 1980s. Under these conditions, the lagoon ecosystem changed from brackish towards freshwater, with major effects on the existing flora and fauna. The period of brutal interventions ended in 1989 and the Razelm-Sinoe Lagoon System became part of the Danube Delta Biosphere Reserve in 1991, with a strict policy of nature protection and restoration. Spatial planning has been the major management option for the entire reserve, lagoon system included. Plans for sustainable development of the Razelm-Sinoe Lagoon System have been built in a participative manner, involving the local stakeholders, as part of FP7 ARCH project. Special attention has been given to impacts of climate change. The study presents the vision for the development Razelm-Sinoe Lagoon System over

  12. Community solar salt production in Goa, India.

    Science.gov (United States)

    Mani, Kabilan; Salgaonkar, Bhakti B; Das, Deepthi; Bragança, Judith M

    2012-12-01

    Traditional salt farming in Goa, India has been practised for the past 1,500 years by a few communities. Goa's riverine estuaries, easy access to sea water and favourable climatic conditions makes salt production attractive during summer. Salt produced through this natural evaporation process also played an important role in the economy of Goa even during the Portuguese rule as salt was the chief export commodity. In the past there were 36 villages involved in salt production, which is now reduced to 9. Low income, lack of skilled labour, competition from industrially produced salt, losses incurred on the yearly damage of embankments are the major reasons responsible for the reduction in the number of salt pans.Salt pans (Mithagar or Mithache agor) form a part of the reclaimed waterlogged khazan lands, which are also utilised for aquaculture, pisciculture and agriculture. Salt pans in Goa experience three phases namely, the ceased phase during monsoon period of June to October, preparatory phase from December to January, and salt harvesting phase, from February to June. After the monsoons, the salt pans are prepared manually for salt production. During high tide, an influx of sea water occurs, which enters the reservoir pans through sluice gates. The sea water after 1-2 days on attaining a salinity of approximately 5ºBé, is released into the evaporator pans and kept till it attains a salinity of 23 - 25ºBé. The brine is then released to crystallizer pans, where the salt crystallises out 25 - 27ºBé and is then harvested.Salt pans form a unique ecosystem where succession of different organisms with varying environmental conditions occurs. Organisms ranging from bacteria, archaea to fungi, algae, etc., are known to colonise salt pans and may influence the quality of salt produced.The aim of this review is to describe salt farming in Goa's history, importance of salt production as a community activity, traditional method of salt production and the biota

  13. Hard bottom substrate monitoring Horns Rev offshore wind farm. Annual status report 2003

    Energy Technology Data Exchange (ETDEWEB)

    Leonhard, S.B.; Pedersen, John

    2004-05-15

    Elsam and Eltra built the offshore demonstration wind farm at Horns Rev in the North Sea. Elsam is the owner and is responsible for the operation of the wind farm. Eltra is responsible for the connection of the wind farm to the national onshore grid. In the summer months of 2002, Elsam constructed the world's largest offshore wind farm off the Danish west coast. The wind farm is sited 14-20 km into the North Sea, west of Blaevands Huk. The first wind turbine was erected in May 2002 and the last wind turbine tower of a total of 80 was in place by August 2002. The construction work was completed with the last connecting cables sluiced down in September 2002. All the wind turbines were in production by December 2002. The expected impact of the wind farm will primarily be an alternation of habitats due to the introduction of hard bottom substrates as wind turbine towers and scour protections. A continuous development in the epifouling communities will be expected together with an introduction of new or alien species in the area. The indigenous benthic community in the area of Horns Rev can be characterised by infauna species belonging to the Goniadella-Spisula community. This community is typical of sandbanks in the North Sea area, although communities in such areas are very variable and site-specific. Character species used as indicators for environmental changes in the Horns Rev area are the bristle worms Goniadella bobretzkii, Ophelia borealis, Psione remota and Orbinia sertulata and the mussels Goodallia triangularis and Spisula solida. In connection with the implementation of the monitoring programme concerning the ecological impact of the introduction of hard substrate related to the Horns Rev Wind Farm, surveys on hard bottom substrate was conducted in March 2003 and in September 2003. This report describes the first year results of surveys on hard substrate after the completion of the offshore wind farm at Horns Rev. (au)

  14. Hard bottom substrate monitoring Horns Rev offshore wind farm. Annual status report. 2004

    Energy Technology Data Exchange (ETDEWEB)

    Leonhard, S.B.; Pedersen, John

    2005-05-15

    Elsam and Eltra have built the offshore demonstration wind farm at Horns Rev in the North Sea. Elsam is the owner and is responsible for the operation of the wind farm. Eltra is responsible for the connection of the wind farm to the national onshore grid. In the summer months of 2002, Elsam constructed the world's largest offshore wind farm at the Danish west coast. The wind farm is located 14-20 km into the North Sea, west of Blaevands Huk. The first wind turbine foundation was in place in March 2002 and the last mono-pile was in place in August 2002 for a total of 80. The construction work was completed with the last connecting cables sluiced down in September 2002. All the wind turbines were in production in December 2002. The expected impact from the wind farm will primarily be an alternation of habitats due to the introduction of hard bottom substrates as wind mono-piles and scour protections. A continuous development in the epifouling communities will be expected together with an introduction of new or alien species in the area. The indigenous benthic community in the area of Horn Rev can be characterised by infauna species belonging to the Goniadella-Spisula community. This community is typical of sandbanks in the North Sea area, although communities in such areas are very variable and site specific. Character species used as indicators for environmental changes in the Horns Rev area are the bristle worms Goniadella bobretzkii, Ophelia borealis, Psione remota and Orbinia sertulata and the mussels Goodallia triangularis and Spisula solida. In connection with the implementation of the monitoring programme concerning the ecological impact of the introduction of hard substrate related to the Horns Rev Wind Farm, surveys on hard bottom substrates were initialised in March 2003 with monitoring conducted in September 2003 and March and September 2004. This report describes the results from surveys on hard substrates in 2004. (au)

  15. The performance study of a small hydroelectric power system

    International Nuclear Information System (INIS)

    Al-Jumaily, Khalil E. J.; Tawfi, Sinan Samir

    2006-01-01

    A small hydroelectric power system of an undershot waterwheel was designed, constructed and experimented in the hydraulic channel which has a sluice gate as a small dam. The constructed waterwheel diameter could be changed from 0.4 m to 0.6 m at interval steps of 0.04 m. The number of blades of the constructed waterwheel could be changed from 9 to 12 to 18 and to 36 blades. By increasing the water mass flow rate from 0.341 to 1.765 kg/s at channel cross sectional area (12.75 cm 2 ), the undershot waterwheel generated power which increased to 0.201 Watt, the mechanical efficiency increased to more than 10.8%, and the electrical efficiency increased to more than 80.6%. But the channel efficiency was decreased to 10.9%. while the volumetric efficiency was fixed at 72.9%. The waterwheel efficiency 17.25 m 2 at fixed water mass flow rate (1.765kg/s), the undershot waterwheel generated power system decreased in the following. The generator output power from 0.201 to 0.067 Watt, the mechanical efficiency reduced to 26.7% and the electrical efficiency reduced 94.4% and increased the channel efficiency from 8.6% to 100%, the volumetric efficiency from 70.9% to 75.5%, and the waterwheel efficiency from 85.7%( to 91.3%. The transitional efficiency was fixed at 97.9%. The maximum overall efficiency of the small generated power system was 6.69% at the water head 15.45 cm. The output power was 0.18 Watt. these values obtained when the number of blades 36, number of revolutions per minute 57 rpm, waterwheel diameter 0.44 m, water mass flow rate 1.765 kg/s, and channel cross sectional area 12.75 cm 2 . The theoretical extrapolation of the waterwheel diameter to 2 m with water head of 5 m gives an output generated power of 675 Watt.(Author)

  16. Nonradioactive Air Emissions Notice of Construction use of a portable exhauster on 241-A-101 tank during salt well pumping and other routine activities

    International Nuclear Information System (INIS)

    Hays, C.B.

    1996-01-01

    The 241-A-101 tank, a 22.9 meter 3,785,400 liter capacity SST, was constructed from the fourth generation of tank designs, which were capable of holding boiling or self-concentrating waste. Construction features a reinforced concrete shell, dome, and base with a mild steel liner covering the bottom and sidewalls. The tank has a flat bottom with a usable waste depth of approximately 9.4 meters. The tank was put into service in 1956 to store plutonium-uranium extraction (PUREX) high-level waste and organic wash waste. The waste was allowed to self-concentrate up until 1968. Tank sluicing was performed in 1969 and again in 1976 to reduce the amount of strontium and cesium, the two isotopes found to be the main heat generating sources in the tank. In 1978, the tank was reassigned for saltcake storage. The tank was taken out of service in November 1980 and partially isolated in 1982. Salt well pumping is a method used to interim stabilize SSTS. Interim stabilization is commenced once all the liquid above the solids has been removed (primary stabilization). Interim stabilization removes the gravity drainable liquid and the interstitial liquid between the solids from the SST and transfers the liquid to a double-shell tank (DST) or to a staging double-contained receiver tank (DCRT), which is subsequently transferred to a DST. Pumping is accomplished at very low flow rates, 15.1 liters per minute or less. Normally, salt well pumping is performed without the need of an exhauster. However, recent safety evaluations concluded that a minimum exhaust flow rate of 7.1 cubic meters per minute would be required to enhance the safety of the tank. Therefore, active ventilation will be part of this process for the 241-A-101 tank. This document details the Nonradioactive Air Emissions Notice of Construction for the use of a portable exhauster on Tank 241-A-101 during salt well pumping and other routine activities

  17. Hard bottom substrate monitoring Horns Rev offshore wind farm. Annual status report. 2004

    Energy Technology Data Exchange (ETDEWEB)

    Leonhard, S B; Pedersen, John

    2005-05-15

    Elsam and Eltra have built the offshore demonstration wind farm at Horns Rev in the North Sea. Elsam is the owner and is responsible for the operation of the wind farm. Eltra is responsible for the connection of the wind farm to the national onshore grid. In the summer months of 2002, Elsam constructed the world's largest offshore wind farm at the Danish west coast. The wind farm is located 14-20 km into the North Sea, west of Blaevands Huk. The first wind turbine foundation was in place in March 2002 and the last mono-pile was in place in August 2002 for a total of 80. The construction work was completed with the last connecting cables sluiced down in September 2002. All the wind turbines were in production in December 2002. The expected impact from the wind farm will primarily be an alternation of habitats due to the introduction of hard bottom substrates as wind mono-piles and scour protections. A continuous development in the epifouling communities will be expected together with an introduction of new or alien species in the area. The indigenous benthic community in the area of Horn Rev can be characterised by infauna species belonging to the Goniadella-Spisula community. This community is typical of sandbanks in the North Sea area, although communities in such areas are very variable and site specific. Character species used as indicators for environmental changes in the Horns Rev area are the bristle worms Goniadella bobretzkii, Ophelia borealis, Psione remota and Orbinia sertulata and the mussels Goodallia triangularis and Spisula solida. In connection with the implementation of the monitoring programme concerning the ecological impact of the introduction of hard substrate related to the Horns Rev Wind Farm, surveys on hard bottom substrates were initialised in March 2003 with monitoring conducted in September 2003 and March and September 2004. This report describes the results from surveys on hard substrates in 2004. (au)

  18. Ecological regime shifts and changes of lake ecosystem service in a shallow Yangtze lake (Taibai Lake, China) over the past 150 years

    Science.gov (United States)

    Dong, X.; Xu, M.; Yang, X.

    2017-12-01

    Shallow lakes provide a range of ecosystem services such as water supply, biodiversity, aquaculture, tourism, shipping and flood regulation. Over recent decades, many lakes have become severely deteriorated due to a coupled natural and human disturbance. Given the limited monitoring records, however, we still have little knowledge on how, when and why those lake experienced ecological status shifts, and how the lake ecosystem service changed. Paleolimnological techniques were widely used in understanding the historical environmental and ecological changes. Here, we chose a typical eutrophic shallow lake, Taibai Lake, and acquired geochemistry proxies, grain size, diatom, cladocera and chironomid from a 210Pb and 137Cs dated sediment core. Document records and monitoring data are also included as important marks of social and environmental change. A T-test based algorithm of STARS reveal at least two ecological shifts, respectively in the 1960s and the 1990s. The sudden shift in the 1960s is supposed to be influenced by a dam and sluice construction in the 1950s and another shift in the 1990s should be a critical transition due to the alternation of ecosystem structure for higher fishery production. Correspondingly, lake ecosystem service (LES) also experienced significant changes. Prior to 1930s, different types of LES kept relatively stable with low values. With the dam construction in the 1960s, the changed hydrological condition led to gradual increases in both regulation and provision service. However, with much effort on fishery and reclamation, the regulation service of the lake decreased, exhibiting a tradeoff among LES. After 1990s, with intense aquaculture, most types of LSE suffered a further decrease. The long-term records exhibited that ecosystem services in primary productivity and biodiversity maintenance increased (synergies) whereas services in water-purification and climate regulating decreased significantly (tradeoffs) since 1950s, when local

  19. Natural and anthropogenic change in the morphology and connectivity of tidal channels of southwest Bangladesh

    Science.gov (United States)

    Wilson, C.; Goodbred, S. L., Jr.; Wallace Auerbach, L.; Ahmed, K. R.; Small, C.; Sams, S. E.

    2014-12-01

    Over the last century, land use changes in the Ganges-Brahmaputra tidal delta have transformed >5000 km2 of intertidal mangrove forest to densely inhabited, agricultural islands that have been embanked to protect against tides and storm surges (i.e., polders). More recently, the conversion of rice paddies to profitable shrimp aquaculture has become increasingly widespread. Recent field studies documented that poldering in southwest Bangladesh has resulted in an elevation deficit relative to that of the natural mangrove forests and mean high water (MHW). The offset is a function of lost sedimentation, enhanced compaction, and an effective rise in MHW from tidal amplification. The morphologic adjustment of the tidal channel network to these perturbations, however, has gone largely undocumented. One effect has been the shoaling of many channels due to decreases in fluvial discharge and tidal prism. We document a previously unrecognized anthropogenic component: the widespread closure of large conduit tidal channels for land reclamation and shrimp farming. GIS analysis of historical Landsat and Google Earth imagery within six 1000 km2 study areas reveals that the tidal network in the natural Sundarbans mangrove forest has remained relatively constant since the 1970s, while significant changes are observed in human-modified areas. Construction of the original embankments removed >1000 km of primary tidal creeks, and >80 km2 of land has been reclaimed outside of polders through the closure of formerly active tidal channels (decrease in mean channel width from 256±91 m to 25±10 m). Tidal restriction by large sluice gates is prevalent, favoring local channel siltation. Furthermore, severing the intertidal platform and large conduit channels from the tidal network has had serious repercussions, such as increased lateral migration and straightening of the remaining channels. Where banklines have eroded, the adjacent embankments appear to be more vulnerable to failure, as

  20. 深厚砂砾石地层固结灌浆在实际工程中的应用%Consolidation Grouting of Deep Sand-gravel Stratum in Practical Engineering Application

    Institute of Scientific and Technical Information of China (English)

    赵健飞

    2014-01-01

    水利工程施工过程中,经常会遇到水工建筑物直接修建在砂砾石地层上,为了提高砂砾石地层的整体性、密实性并降低其透水率,一般需要对坝基采取全面的固结灌浆,必要时也在坝基上、下游一定范围内进行固结灌浆。结合水利枢纽的工程实践,对泄洪冲沙闸底板进行全面的固结灌浆处理,施工过程中采用自上而下分段灌浆方法,对现有的钻探与灌浆工艺技术进行优化组合,最终经灌后质量检查,结果满足深厚砂砾石覆盖层固结灌浆的设计要求,取得了良好的效果。%In the construction of hydraulic engineering projects ,the hydraulic structures are often directly built on the sand gravel stratum .In order to improve the integrity of sandy gravel stratum and reduce its permeability ,it is common to apply comprehensive consolidation grouting on the dam foundation ,sometimes consolidation grouting is also carried out in a certain range of the upstream and downstream of the dam foundation when necessary .In the construction of an engineer-ing project ,the comprehensive consolidation grouting was applied on the floor of the outlet sluice with descending stage grouting method during the construction process .This method combined the advantages of the existing drilling and grout-ing techniques and reached a optimum combination .The result of the quality inspection indicates that the outcome not on-ly meets the specifications of consolidation grouting of deep sand gravel stratum ,but also has excellent performance .

  1. MacDonald Dam reconstruction : using roller-compacted concrete

    Energy Technology Data Exchange (ETDEWEB)

    O' Neil, E. [AMEC Earth and Environmental Ltd., Sydney, NS (Canada)

    2007-04-01

    Located in Nova Scotia, the MacDonald Dam was commissioned in 1928. The dam consists of a 122 metre-long, 16 metre-high concrete structure comprised of an intake structure, stoplog openings, and a 34 metre-long free-overflow spillway. A 488 metre-long power canal was added as an upgrade in the 1950s. This paper provided details of the roller-compact concrete (RCC) used in the dam's recent rehabilitation following a dam failure analysis in 2003 by Nova Scotia Power Inc. RCC was chosen to help keep the dam's construction project on schedule. The layout and cross-section of the spillway was selected with consideration given to the RCC placing operation. A lift thickness of 0.20 m was selected. A formed ogee crest consisting of conventional reinforced concrete was constructed on top of the RCC. The downstream steps of the spillway were also covered with cast-in-place concrete. A low level sluice was designed to resist the weight of the wet RCC. The design compressive strength of the RCC was 20 MPa. The forms used to support the cast-in-place facing concrete on the upstream face of the dam were constructed full height and were braced back to the downstream face of the existing concrete structure prior to the start of RCC placement. Formwork inserts were placed in the facing concrete as construction progressed. Crack inducers were pre-placed on the forms. Aggregates from a local source were transported to a pug mill as the RCC construction progressed. The RCC was spread into 0.20 m lifts using a small bull-dozer, and the facing concrete was vibrated into the lift below. RCC lifts were compacted using a 9 tonne vibratory drum roller. The RCC placing operation was completed over a period of 10 days. Following the completion of the RCC portion of the dam, the remainder of the cast-in-place concrete was completed. It was concluded that the RCC provided a durable, low-maintenance structure that was completed at a lower price and in a shorter time-frame than

  2. Preliminary investigation of the potential of harnessing tidal energy for electricity generation in Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Lee, K.S.; Seng, L.Y. [Tunku Abdul Rahman Univ. (Malaysia). Dept. of Electrical and Electronic Engineering

    2008-07-01

    Malaysia relies heavily on fossil fuels to meet its energy demands. However, Malaysia has started to explore the use of other forms of renewable energy such as solar energy, biofuels and tidal power. This paper focused on the potential of harnessing tidal energy in Malaysia for electricity production. There are several sites with great potential for tidal energy conversion, which could supplement the energy needs of Malaysia while reducing greenhouse gas emissions. Illustrations were included to show the amplitude of the main harmonic component of the tidal range around Malaysia. The main harmonic component found in the region has a maximum amplitude of 1.4 m, confirming the potential of tidal energy in Malaysia's Ocean. Since the tidal cycle is highly predictable, it has the potential to be a very reliable renewable energy source. Two main approaches are being researched internationally to harness the energy from tides, notably the barrage approach and the tidal stream approach. For the barrage approach, a physical barrier is created within the sea, and a sluice gate controls the flow of sea water. In the tidal stream approach, horizontal axis turbines are placed in the path of tidal currents to generate electricity, similar to the operation of wind turbines. This paper described the flow velocity, power output, availability of power supply and monthly yield of turbines using both the barrage and tidal stream approaches. The study showed that for the barrage approach, there are 6 sites in Malaysia where 14,970 kWH of energy can be generated monthly with a single turbine with a 5 m long blade. The tidal stream approach showed equally promising results at 2 sites. It was concluded that tidal energy is a promising form of renewable energy because of its cyclic, reliable and predictable nature and the vast energy contained within it. According to United Kingdom Department of Trade and Industry, 10 per cent of the United Kingdom's electricity needs could be

  3. Solid Phase Characterization Of Heel Samples From Tank 241-C-110

    International Nuclear Information System (INIS)

    Page, J.S.; Cooke, G.A.; Pestovich, J.A.; Huber, H.J.

    2011-01-01

    During sluicing operations of tank 241-C-110, a significant amount of solids were unable to be retrieved. These solids (often referred to as the tank 'heel') were sampled in 2010 and chemically and mineralogically analyzed in the 222-S Laboratory. Additionally, dissolution tests were performed to identify the amount of undissolvable material after using multiple water contacts. This report covers the solid phase characterization of six samples from these tests using scanning electron microscopy, polarized light microscopy, and X-ray diffraction. The chemical analyses, particle size distribution analysis, and dissolution test results are reported separately. Two of the samples were from composites created from as-received material - Composite A and Composite B. The main phase in these samples was sodium-fluoride-phosphate hydrate (natrophosphate) - in the X-ray diffraction spectra, this phase was the only phase identifiable. Polarized light microscopy showed the presence of minor amounts of gibbsite and other phases. These phases were identified by scanning electron microscopy - energy dispersive X-ray spectroscopy as sodium aluminosilicates, sodium diuranate, and sodium strontium phosphate hydrate (nastrophite) crystals. The natrophosphate crystals in the scanning electron microscopy analysis showed a variety of erosive and dissolution features from perfectly shaped octahedral to well-rounded appearance. Two samples were from water-washed Composites A and B, with no change in mineralogy compared to the as-received samples. This is not surprising, since the water wash had only a short period of water contact with the material as opposed to the water dissolution tests. The last two samples were residual solids from the water dissolution tests. These tests included multiple additions of water at 15 C and 45 C. The samples were sieved to separate a coarser fraction of > 710 μm and a finer fraction of < 710 μm. These two fractions were analyzed separately. The coarser

  4. Characterization engineering status report october 1998 - december 1998; TOPICAL

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    Characterization Engineering (CE) continues to make progress in support of the project goal of characterizing the Hanford high-level waste tanks. Two core sampling systems were operational during this reporting period-push mode core sampling system No. 1 and rotary mode core sampling system No. 4. The availability average for core sampling systems No. 1 , No. 3 and No. 4, combined, was 45 percent, down from 79percent for the previous quarter and 58 percent for FY 1998. System No. 2 did not have scope during the quarter, and availability was not hacked. System No. 3 was out of service the entire quarter for corrective maintenance. Two tanks were core sampled during the reporting period, and 24 samples were retrieved. Core sample recovery increased slightly during the quarter. System No. 1 average sample recovery increased from 80percent to 81 percent, The rotary mode core sampling average recovery increased to 62 percent from 55 percent for the previous quarter. sampling six tanks, one more than scheduled. Vapor Sampling was utilized in support of the sluicing of tank 241-C-106 and for emissions monitoring of three exhaust stacks. Increased support was provided for Vapor Sampling the Standard Hydrogen Monitoring Systems. The sampling was necessary due to freezing problems with the field-installed systems. Preparations are continuing for the Light-Duty Utility Arm (LDUA) deployment with configuration and minor hardware upgrades. The LDUA Operational Readiness Review continues. The oversight of the Nested, Fixed-Depth Sampler system development has started to increase in order to ensure that a usable system is received when the project is completed. To improve configuration control, 92 drawing sheet revisions were completed along with the generation of nine new drawing sheets. The number of outstanding Engineering Change Notices increased slightly because of the addition of more drawings into the project. continues to develop. Organizational responsibilities are being

  5. Identifying and Evaluating Options for Improving Sediment Management and Fish Passage at Hydropower Dams in the Lower Mekong River Basin

    Science.gov (United States)

    Wild, T. B.; Reed, P. M.; Loucks, D. P.

    2015-12-01

    The Mekong River basin in Southeast Asia is undergoing intensive and pervasive hydropower development to satisfy demand for increased energy and income to support its growing population of 60 million people. Just 20 years ago this river flowed freely. Today some 30 large dams exist in the basin, and over 100 more are being planned for construction. These dams will alter the river's natural water, sediment and nutrient flows, thereby impacting river morphology and ecosystems, and will fragment fish migration pathways. In doing so, they will degrade one of the world's most valuable and productive freshwater fish habitats. For those dams that have not yet been constructed, there still exist opportunities to modify their siting, design and operation (SDO) to potentially achieve a more balanced set of tradeoffs among hydropower production, sediment/nutrient passage and fish passage. We introduce examples of such alternative SDO opportunities for Sambor Dam in Cambodia, planned to be constructed on the main stem of the Mekong River. To evaluate the performance of such alternatives, we developed a Python-based simulation tool called PySedSim. PySedSim is a daily time step mass balance model that identifies the relative tradeoffs among hydropower production, and flow and sediment regime alteration, associated with reservoir sediment management techniques such as flushing, sluicing, bypassing, density current venting and dredging. To date, there has been a very limited acknowledgement or evaluation of the significant uncertainties that impact the evaluation of SDO alternatives. This research is formalizing a model diagnostic assessment of the key assumptions and parametric uncertainties that strongly influence PySedSim SDO evaluations. Using stochastic hydrology and sediment load data, our diagnostic assessment evaluates and compares several Sambor Dam alternatives using several performance measures related to energy production, sediment trapping and regime alteration, and

  6. Captación de aguas subálveas en la confluencia de los ríos Lozoya y Jarama

    Directory of Open Access Journals (Sweden)

    López de Berges y de los Santos, Emilio

    1967-06-01

    Full Text Available The purpose of the arrangement described in this article is to take advantage of the unground water available at the junction of the Lozoya and Jarama rivers, to collect it for the Madrid water supply system. The water is collected by means of two Ranney wells, with radial drainages in metal plates with longitudinal slits. The total length of these slits, for each well, is 500 m. The filtered water is pumped to La Parra Canal, along a steel welded tube, with a capacity of 1 m3/sec. To increase the water pressure on the drainage surface, a small reservoir has been constructed, with moveable Taintor sluice gates and with two lateral spillways. The volume of 1 m3/s of additional water is an important increase in the water supply of Madrid, especially taking into account the short time taken to complete this project and its low cost. The water is of very pure quality, owing to the filtration that it undergoes, both along the river bed and at the collecting wells.El objeto del dispositivo que se describe es aprovechar el caudal subálveo de la confluencia de los ríos Lozoya y Jarama, para incorporarlo al abastecimiento de agua a Madrid. La captación se realiza con dos pozos Ranney, con drenes radiales de palastro ranurados longitudinalmente y con una longitud total de unos 500 m para cada pozo. El agua filtrada es impulsada al Canal de La Parra por una tubería de acero electrosoldada con capacidad de 1 m3/s. Para aumentar la carga de agua sobre los drenes se ha construido un azud con dos vanos móviles provistos de compuertas Taintor, y dos aliviaderos laterales. El rendimiento obtenido de 1 m3/s constituye una importante mejora en el abastecimiento de aguas a la capital, habida cuenta del reducido plazo de ejecución y la economía de esta obra. El agua obtenida resulta de inmejorables condiciones a causa del filtrado a que se encuentra sometida, tanto por los acarreos del río como por los drenes de captación.

  7. Changes in Ecosystem Services and related Livelihoods in the Mekong Delta: vulnerabilities and adaptation strategies

    Science.gov (United States)

    Sebesvari, Z.; Renaud, F. G.

    2014-12-01

    The Mekong Delta (Vietnam) is highly vulnerable to the many impacts of global environmental change as well as to the accelerating anthropogenic changes in the catchment and in the delta itself. Today the delta is an agricultural landscape controlled by engineering structures such as channels, dykes, embankments, and sluice gates. These structures have been constructed gradually over the last 200 years mainly for irrigation and flood control in the upper part of the delta and to control saline intrusion in the coastal areas. Recent changes in the hydrology mainly driven by upstream hydropower development on the mainstream and the tributaries of the Mekong will likely have far reaching impacts on the delta´s social-ecological systems through changes in e.g. sedimentation processes, nutrient transport as well as the health of aquatic ecosystems. Further threats to the delta include sea level rise and an increase in seasonal rainfall variability leading to an increase in flood variability. These changes affect the lives of millions of low-income inhabitants who depend on the ecosystem services provided by the Mekong for their livelihoods and sustenance. Since the changes in ecosystem service provision are occurring relatively fast while the resource dependency of the delta population is very high, adaptation becomes a challenge. An assessment of livelihood dependencies on ecosystem services requires an understanding of ecosystem services affected by different drivers of change, as well as of the types of livelihoods likely to be jeopardized as a result of these changes. We will present main ecosystem services supporting specific livelihoods, discuss how they are threatened, and analyse the merits of potential solutions. Options based solely on grey infrastructure might be problematic on the long term while an integration of ecosystem based solution such as a (re)adaptation of agricultural production systems to floods in the upper delta might be a more sustainable

  8. [Clinical and experimental studies on the pathogenesis in pregnancy induced hypertension].

    Science.gov (United States)

    Hidaka, A

    1988-08-01

    Placental ischemia is one of the etiological factors of pregnancy induced hypertension (PIH), however, the pathogenesis of placental and renal ischemia has not been clarified. The purposes of this investigation are (1) to clarify the fetomaternal hemodynamic changes in PIH and the influence of maternal postural change on fetomaternal hemodynamics, measured by thermodilution method, impedance cardiography and pulsed doppler method during pregnancy, (2) to provide to relationship between intrauterine resting tonus and maternal hemodynamics, that is, blood pressure, placental and renal blood flow measured by electromagnetic flowmeter and thermocouple method, and renal nerve activity, and (3) to study the influence of placental ischemia on vascular sensitivity to angiotensin II measured by Magnus method in animal experiment. (1) The increase in C.O and blood volume were recognized from the beginning of pregnancy to 24 GW, and subsequently, the decreasing tendency were found from about 32 GW to the onset of labor. However this decreasing tendency were subsided in the lateral position. These circulatory changes were observed in both normotensive and PIH cases, and especially, the decrease in C.O and blood volume in late pregnancy were more remarkable in PIH than that in normotensive pregnancy. From the results of Starling curve, left ventricular work was more hyperdynamic status in PIH than that in normotensive pregnancy, these results show that there are a compensatory mechanism against high vascular resistance in PIH. A/B (S/D) ratio in uterine artery, umbilical artery and fetal aorta were lowered in II-nd and III-rd trimester and more decreased in the lateral position from the supine position, on the other hand these ratio in PIH were elevated respectively. These results show that there are the aortocaval compression by the heavy tensive uterus and subsequent sluice flow mechanism in fetoplacental circulation in the supine position in late pregnancy. (2) These

  9. The 'Amstel Canal' in Amsterdam Canal construction as part of the medieval reclamation and drainage system of the Western Netherlands wilderness

    Science.gov (United States)

    Abrahamse, Jaap-Evert; Kosian, Menne; Weerts, Henk

    2013-04-01

    the digging of many canals and the construction of several sluice complexes. This shift from natural to man-made drainage systems was unprecedented at this scale in North-Western Europe. An unlooked-for consequence of the digging the Amstel canal and many other drainage canals during and after the Great Reclamations was the layout of a network of infrastructure that later enabled the rise of cities in Holland.

  10. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 1 [of 2

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, BE

    2003-10-07

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and {approx}420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. A phased and integrated approach to waste retrieval operations was used for the GAAT Remediation Project. The project promoted safety by obtaining experience from low-risk operations in the North Tank Farm before moving to higher-risk operations in the South Tank Farm. This approach allowed project personnel to become familiar with the tanks and waste, as well as the equipment, processes, procedures, and operations required to perform successful waste retrieval. By using an integrated approach to tank waste retrieval and tank waste management, the project was completed years ahead of the original baseline schedule, which resulted in avoiding millions of dollars in associated costs. This report is organized in two volumes. Volume 1 provides information on the various phases of the GAAT Remediation Project. It also describes the different types of equipment and how they were used. The emphasis of Volume 1 is on the description of the tank waste retrieval performance and the lessons learned during the GAAT Remediation Project. Volume 2 provides the appendixes for the report, which include the following information: (A) Background Information for the Gunite and Associated Tanks Operable Unit; (B) Annotated Bibliography; (C) Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; (D) GAAT Equipment Matrix; and (E) Vendor List

  11. Palaeoflood evidence on the River Nore, South East Ireland

    Science.gov (United States)

    Fleming, Ciara; Turner, Jonathan; Bourke, Mary

    2017-04-01

    Past geomorphic changes can be detected in sediment sinks, through the investigation of natural sediment archives. Since the advent of palaeoflood hydrology in the 1980s, numerous authors have demonstrated that such sediment deposits record valuable evidence of past flooding events. Many of these studies have focussed on fluvial systems in arid environments, with bedrock channels proving to be particularly successful field sites. In some districts, the collected datasets are now routinely employed to augment analyses of flood frequency and magnitude, which have traditionally relied on extrapolation of short hydrometric datasets. This study targets river reaches in a temperate humid environment, with a predominantly alluvial channel. The River Nore is one of the largest catchments draining South East Ireland. It is situated in a valley with an inherited glacial legacy and is principally a lowland river catchment. Specific morphological zones have been targeted which are optimal for flood deposit preservation, including palaeochannels, tributary junctions and floodplain overbank settings.There are a variety of anthropogenic pressures evident in this landscape. Among them are channelisation of select tributaries, a legacy of coal mining in the upland Carboniferous limestones, and the installation of man-made obstacles or modifications along the length of the river channel such as sluices and weirs. Regarding land-use, the majority of the catchment is dominated by agriculture, mainly pasture with some tillage. This study investigates palaeoflood evidence in the River Nore catchment and examines the development of the river floodplain using a variety of complementary field and desk-based methods. The sub-surface and micro-topography of river reaches are investigated using Ground Penetrating Radar (GPR) and Unmanned Aerial Vehicle (UAV) technology. Flood deposits have been characterised by examination of bank exposures and sediment cores. Installation of sediment traps

  12. Characterization of In-Drum Drying Products

    International Nuclear Information System (INIS)

    Kroselj, V.; Jankovic, M.; Skanata, D.; Medakovic, S.; Harapin, D.; Hertl, B.

    2006-01-01

    A few years ago Krsko NPP decided to introduce In-Drum Drying technology for treatment and conditioning of evaporator concentrates and spent ion resins. The main reason to employ this technology was the need for waste volume reduction and experience with vermiculite-cement solidification that proved inadequate for Krsko NPP. Use of In-Drum Drying technology was encouraged by good experience in the field at some German and Spanish NPP's. In the paper, solidification techniques in vermiculite-cement matrix and In-Drum Drying System are described briefly. The resulting waste forms (so called solidification and dryer products) and containers that are used for interim storage of these wastes are described as well. A comparison of the drying versus solidification technology is performed and advantages as well as disadvantages are underlined. Experience gained during seven years of system operation has shown that crying technology resulted in volume reduction by factor of 20 for evaporator concentrates, and by factor of 5 for spent ion resin. Special consideration is paid to the characterization of dryer products. For evaporator concentrates the resulting waste form is a solid salt block with up to 5% bound water. It is packaged in stainless steel drums (net volume of 200 l) with bolted lids and lifting rings. The fluidized spent ion resins (primary and blow-down) are sluiced into the spent resin drying tank. The resin is dewatered and dried by electrical jacket heaters. The resulting waste (i.e. fine granulates) is directly discharged into a shielded stainless steel drum with bolted lid and lifting rings. Characterization of both waste forms has been performed in accordance with recommendations given in Characterization of Radioactive Waste Forms and Packages issued by International Atomic Energy Agency, 1997. This means that radiological, chemical, physical, mechanical, biological and thermal properties of the waste form has been taken into consideration. In the paper

  13. INNOVATIVE TECHNIQUES AND TECHNOLOGY APPLICATION IN MANAGEMENT OF REMOTE HANDLED AND LARGE SIZED MIXED WASTE FORMS

    International Nuclear Information System (INIS)

    BLACKFORD LT

    2008-01-01

    CH2M HILL Hanford Group, Inc. (CH2M HILL) plays a critical role in Hanford Site cleanup for the U. S. Department of Energy, Office of River Protection (ORP). CH2M HILL is responsible for the management of 177 tanks containing 53 million gallons of highly radioactive wastes generated from weapons production activities from 1943 through 1990. In that time, 149 single-shell tanks, ranging in capacity from 50,000 gallons to 500,000 gallons, and 28 double-shell tanks with a capacity of 1 million gallons each, were constructed and filled with toxic liquid wastes and sludges. The cleanup mission includes removing these radioactive waste solids from the single-shell tanks to double-shell tanks for staging as feed to the Waste Treatment Plant (WTP) on the Hanford Site for vitrification of the wastes and disposal on the Hanford Site and Yucca Mountain repository. Concentrated efforts in retrieving residual solid and sludges from the single-shell tanks began in 2003; the first tank retrieved was C-106 in the 200 East Area of the site. The process for retrieval requires installation of modified sluicing systems, vacuum systems, and pumping systems into existing tank risers. Inherent with this process is the removal of existing pumps, thermo-couples, and agitating and monitoring equipment from the tank to be retrieved. Historically, these types of equipment have been extremely difficult to manage from the aspect of radiological dose, size, and weight of the equipment, as well as their attendant operating and support systems such as electrical distribution and control panels, filter systems, and mobile retrieval systems. Significant effort and expense were required to manage this new waste stream and resulted in several events over time that were both determined to be unsafe for workers and potentially unsound for protection of the environment. Over the last four years, processes and systems have been developed that reduce worker exposures to these hazards, eliminate violations

  14. Characterization of contaminant transport by gravity, capillarity and barometric pumping in heterogeneous vadose regimes. 1998 annual progress report

    International Nuclear Information System (INIS)

    Carrigan, C.R.; Hudson, G.B.

    1998-01-01

    'The intent of this research program is to obtain an improved understanding of vadose zone transport processes and to develop field and modeling techniques required to characterize contaminant transport in the unsaturated zone at DOE sites. For surface spills and near-surface leaks of chemicals, the vadose zone may well become a long-term source of contamination for the underlying water table. Transport of contaminants can occur in both the liquid and gas phases of the unsaturated zone. This transport occurs naturally as a result of diffusion, buoyancy forces (gravity), capillarity and barometric pressure variations. In some cases transport can be enhanced by anisotropies present in hydrologic regimes. This is particularly true for gas-phase transport which may be subject to vertical pumping resulting from atmospheric pressure changes. For liquid-phase flows, heterogeneity may enhance the downward transport of contaminants to the water table depending on soil properties and the scale of the surface spill or near-surface leak. Characterization techniques based upon the dynamics of transport processes are likely to yield a better understanding of the potential for contaminant transport at a specific site than methods depending solely on hydrologic properties derived from a borehole. Such dynamic-characterization techniques can be useful for evaluating sites where contamination presently exists as well as for providing an objective basis to evaluate the efficacy of proposed as well as implemented clean-up technologies. The real-time monitoring of processes that may occur during clean-up of tank waste and the mobility of contaminants beneath the Hanford storage tanks during sluicing operations is one example of how techniques developed in this effort can be applied to current remediation problems. In the future, such dynamic-characterization methods might also be used as part of the site-characterization process for determining suitable locations of new DOE facilities

  15. Reproductive success of Whiskered Tern Chlidonias hybrida in eastern Spain in relation to water level variation.

    Science.gov (United States)

    Ortiz Lledó, Álvaro; Vidal Mateo, Javier; Urios Moliner, Vicente

    2018-01-01

    caused the loss of nests, eggs and nestlings, even when wetland water levels remained constant. The influence of the anchorage depth of the nest and the water level fluctuation rate were analyzed and did not provide statistically significant results. It was not possible to establish a clear pattern on these latter variables, so further studies are needed to obtain more significant results. We propose to undertake similar studies in wetlands where the water level can be regulated, with the range of nest anchorage depth on the emergent vegetation being between 30 and 60 cm, which could improve the reproductive success in this kind of habitats. As recommendation, in water level controlled wetlands (that use sluices), it should not vary more than ±6 cm in a short time (1-2 days) once the nests are established since it negatively affects their reproductive success.

  16. C-106 tank process ventilation test

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    Project W-320 Acceptance Test Report for tank 241-C-106, 296-C-006 Ventilation System Acceptance Test Procedure (ATP) HNF-SD-W320-012, C-106 Tank Process Ventilation Test, was an in depth test of the 296-C-006 ventilation system and ventilation support systems required to perform the sluicing of tank C-106. Systems involved included electrical, instrumentation, chiller and HVAC. Tests began at component level, moved to loop level, up to system level and finally to an integrated systems level test. One criteria was to perform the test with the least amount of risk from a radioactive contamination potential stand point. To accomplish this a temporary configuration was designed that would simulate operation of the systems, without being connected directly to the waste tank air space. This was done by blanking off ducting to the tank and connecting temporary ducting and an inlet air filter and housing to the recirculation system. This configuration would eventually become the possible cause of exceptions. During the performance of the test, there were points where the equipment did not function per the directions listed in the ATP. These events fell into several different categories. The first and easiest problems were field configurations that did not match the design documentation. This was corrected by modifying the field configuration to meet design documentation and reperforming the applicable sections of the ATP. A second type of problem encountered was associated with equipment which did not operate correctly, at which point an exception was written against the ATP, to be resolved later. A third type of problem was with equipment that actually operated correctly but the directions in the ATP were in error. These were corrected by generating an Engineering Change Notice (ECN) against the ATP. The ATP with corrected directions was then re-performed. A fourth type of problem was where the directions in the ATP were as the equipment should operate, but the design of

  17. Communities of gastrointestinal helminths of fish in historically connected habitats: habitat fragmentation effect in a carnivorous catfish Pelteobagrus fulvidraco from seven lakes in flood plain of the Yangtze River, China

    Directory of Open Access Journals (Sweden)

    Yao Wei J

    2009-04-01

    Full Text Available Abstract Background Habitat fragmentation may result in the reduction of diversity of parasite communities by affecting population size and dispersal pattern of species. In the flood plain of the Yangtze River in China, many lakes, which were once connected with the river, have become isolated since the 1950s from the river by the construction of dams and sluices, with many larger lakes subdivided into smaller ones by road embankments. These artificial barriers have inevitably obstructed the migration of fish between the river and lakes and also among lakes. In this study, the gastrointestinal helminth communities were investigated in a carnivorous fish, the yellowhead catfish Pelteobagrus fulvidraco, from two connected and five isolated lakes in the flood plain in order to detect the effect of lake fragmentation on the parasite communities. Results A total of 11 species of helminths were recorded in the stomach and intestine of P. fulvidraco from seven lakes, including two lakes connected with the Yangtze River, i.e. Poyang and Dongting lakes, and five isolated lakes, i.e. Honghu, Liangzi, Tangxun, Niushan and Baoan lakes. Mean helminth individuals and diversity of helminth communities in Honghu and Dongting lakes was lower than in the other five lakes. The nematode Procamallanus fulvidraconis was the dominant species of communities in all the seven lakes. No significant difference in the Shannon-Wiener index was detected between connected lakes (0.48 and isolated lakes (0.50. The similarity of helminth communities between Niushan and Baoan lakes was the highest (0.6708, and the lowest was between Tangxun and Dongting lakes (0.1807. The similarity was low between Dongting and the other lakes, and the similarity decreased with the geographic distance among these lakes. The helminth community in one connected lake, Poyang Lake was clustered with isolated lakes, but the community in Dongting Lake was separated in the tree. Conclusion The

  18. Reproductive success of Whiskered Tern Chlidonias hybrida in eastern Spain in relation to water level variation

    Directory of Open Access Journals (Sweden)

    Álvaro Ortiz Lledó

    2018-04-01

    climatic events, such as strong wind, rain or hail, also caused the loss of nests, eggs and nestlings, even when wetland water levels remained constant. The influence of the anchorage depth of the nest and the water level fluctuation rate were analyzed and did not provide statistically significant results. It was not possible to establish a clear pattern on these latter variables, so further studies are needed to obtain more significant results. We propose to undertake similar studies in wetlands where the water level can be regulated, with the range of nest anchorage depth on the emergent vegetation being between 30 and 60 cm, which could improve the reproductive success in this kind of habitats. As recommendation, in water level controlled wetlands (that use sluices, it should not vary more than ±6 cm in a short time (1–2 days once the nests are established since it negatively affects their reproductive success.

  19. Sedimentation survey of Lago Loíza, Trujillo Alto, Puerto Rico, July 2009

    Science.gov (United States)

    Soler-López, Luis R.; Licha-Soler, N.A.

    2014-01-01

    Lago Loíza is a reservoir formed at the confluence of Río Gurabo and Río Grande de Loíza in the municipality of Trujillo Alto in central Puerto Rico, about 10 kilometers (km) north of the town of Caguas, about 9 km northwest of Gurabo, and about 3 km south of Trujillo Alto (fig. 1). The Carraizo Dam is owned and operated by the Puerto Rico Aqueduct and Sewer Authority (PRASA), and was constructed in 1953 as a water-supply reservoir for the San Juan Metropolitan area. The dam is a concrete gravity structure that is located in a shallow valley and has a gently sloping left abutment and steep right abutment. Non-overflow sections flank the spillway section. Waterways include an intake structure for the pumping station and power plant, sluiceways, a trash sluice, and a spillway. The reservoir was built to provide a storage capacity of 26.8 million cubic meters (Mm3) of water at the maximum pool elevation of 41.14 meters (m) above mean sea level (msl) for the Sergio Cuevas Filtration Plant that serves the San Juan metropolitan area. The reservoir has a drainage area of 538 square kilometers (km2) and receives an annual mean rainfall that ranges from 1,600 to 5,000 millimeters per year (mm/yr). The principal streams that drain into Lago Loíza are the Río Grande de Loíza, Río Gurabo, and Río Cañas. Two other rivers, the Río Bairoa and Río Cagüitas, discharge into the Río Grande de Loíza just before it enters the reservoir. The combined mean annual runoff of the Río Grande de Loíza and the Río Gurabo for the 1960–2009 period of record is 323 Mm3. Flow from these streams constitutes about 89 percent of the total mean annual inflow of 364 Mm3 to the reservoir (U.S. Geological Survey, 2009). Detailed information about Lago Loíza reservoir structures, historical sediment accumulation, and a dredge conducted in 1999 are available in Soler-López and Gómez-Gómez (2005). During July 8–15, 2009, the U.S. Geological Survey (USGS) Caribbean Water Science

  20. The backbone of the peatlands. The boezem: a crucial link in the cultural-historical cohesiveness of the peatlands

    Directory of Open Access Journals (Sweden)

    Inge Bobbink

    2017-09-01

    Full Text Available Given that the polder boezem* system, and in particular its network structure, is crucial to the spatial identity of the Dutch cultural landscape, a thorough cultural- historical understanding of that system is a precondition for the effective implementation of necessary future changes to the system. The boezem system in the western part of the Netherlands evolved over a period of more than five hundred years and exhibits considerable local differences in structure and form. It developed in response to a combination of a falling ground level and a rising sea level, which meant that excess water could no longer be drained without additional measures. Existing streams, watercourses and canals were accordingly diked in, modified and connected to one another to store water from the neighbouring polders or discharge it into the water outside the dikes. Within this system, a water level was established somewhere between the water levels inside and outside the dikes. To bridge the difference, sluices and pumping stations were built at discharge points. In order to fully understand the boezem system in the Randstad** study area, several different landscape layers were investigated. To determine the landscapearchitectural character, drawings were made based on historical maps and reconstructions, such as paleogeographic maps. The drawings were made using the overlay technique, which entails the superimposition of information from different historical sources. Each final drawing represents a reduction of information about the topic under consideration. This approach revealed three distinct landscape layers: the natural, the cultural-technical and the urban. The natural landscape layer is a reflection of geological formation: the landscape as shaped by the forces of nature. The cultural-technical landscape layer arose out of the confrontation between the natural landscape and the land reclamation grid. The urban landscape layer represents a further

  1. Development of adaptation strategies of marshland water management to regional climate change

    Science.gov (United States)

    Bormann, Helge; Frank, Ahlhorn; Luise, Giani; Kirsten, Klaassen; Thomas, Klenke

    2010-05-01

    Since many centuries, low lying areas at the German North Sea coast are intensively managed by water boards and dike boards. Sophisticated water management systems have been developed in order to keep the water out of the low lying areas in wet periods, while in some regions additional water is needed in dry periods for agricultural and ecological purposes. For example in the Wesermarsch region, a water management system has been developed in historical times, draining the landscape in winter time by means of channels, ditches, gates, sluices and pumping stations. In contrast, in summer time water is conducted from Weser River into the Wesermarsch region to serve watering of animals, fencing grazing areas and ensuring a continuous flow in the marsh watercourses. Doing so, maintaining soil fertility is guaranteed for agriculture as well as protection against floods, sustaining river ecology and traditional livestock farming. Due to climate variability and river engineering, the water management of the Wesermarsch already runs into problems because watering in summer cannot be assured any longer in sufficient water quality. During high tides, salt water from the North Sea is flowing upstream into the Weser estuary, generating brackish conditions in the lower Weser River. In addition, soil subsidence and soil mineralization of marsh and peat soils as well as the sea level rise increase the necessary pumping frequency and the emerging energy costs. The expected future climate change will further aggravate those problems and require an adaptation of the current management system. This presentation introduces the concept behind and preliminary results of an integrative and participatory project, aiming at the development of a new water management strategy adapted to the regional climate change likely to occur until year 2050. In close cooperation with a number of regional stakeholders and based on the priorities with respect to the future development of the region

  2. The source and fate of sediment and mercury in the Tapajós River, Pará, Brazilian Amazon: Ground- and space-based evidence.

    Science.gov (United States)

    Telmer, Kevin; Costa, Maycira; Simões Angélica, Rômulo; Araujo, Eric S; Maurice, Yvon

    2006-10-01

    We present results of mercury (Hg) in surface waters and soils and an analysis of satellite imagery from the Tapajós River basin, Brazilian Amazon, and the Reserva Garimpeira do Tapajós, the legal gold mining district of the basin. Hg bound to suspended sediment was roughly 600 and 200 times the concentration of dissolved Hg per litre of water, in impacted and pristine areas, respectively. Suspended sediments thus represent the major pathway of river-borne Hg. Median concentrations of Hg in suspended load from both impacted and pristine waters were 134 ppb, and 80% of samples were below 300ppb-in the range of naturally occurring surficial materials in the tropics. Regionally, riverine Hg fluxes were proportional to the concentration of total suspended solids. This shows that the dominant source of Hg is the sediment itself rather than anthropogenic mercury discharge from the small-scale mines. To independently test this conclusion, a mass balance was performed. A conservative calculation of the annual export of mercury (Hg) from the Creporí River (a minimum) was 1.6 tonnes for the year 1998-it could be significantly larger. This amount of Hg is difficult to account for by anthropogenic discharge alone, confirming that enhanced physical erosion caused by sluicing and dredging operations is the dominant source of Hg. We therefore conclude that gold mining operations are primarily responsible for elevated Hg concentrations. The dominant source of contamination is not, however, the loss of Hg in the gold amalgamation process. Rather, the disturbance and mobilization of large quantities of Hg-rich sediment and floodplain soil into the water column during mining operations is the source of contamination. These findings shift the focus of remediation and prevention efforts away from Hg control toward soil and sediment erosion control. The minimization or elimination of Hg losses in the mining process remains important for the health of local peoples and environments

  3. Monitoring strategies associated with the controlled drawdown of a hydropower reservoir

    Science.gov (United States)

    Hauer, Christoph; Haimann, Marlene; Habersack, Helmut; Haun, Stefan; Hammer, Andreas; Schletterer, Martin

    2017-04-01

    Reservoirs are important in context of an increased demand on renewable energy and water for irrigation and drinking water purposes. Thus reservoir management is an important task. Beside the technical and the economically feasibility ecological factors are important issues. Thus, an integrative monitoring concept was developed and applied during a controlled drawdown of the Gepatsch reservoir in the Austrian Alps.The controlled drawdown (December 2015 - March 2016) was done slowly, with the consequence of moderatesuspended sediment concentrations (SSCs) in the downstream Inn river. The water was released through the penstock towards the turbines and directly into the Inn River. However, to limit the erosional impact on turbines only one Twin-Pelton turbines was operated during the controlled drawdown. The monitoring program itself was subdivided into monitoring of the sediments in the penstock to determine the amount and the composition of sediments which were sluiced through the turbine, monitoring of the turbine itself to quantify the damages of the turbine and a monitoring related to SSCs in the downstream river reach. In order to detect possible changes, measured discharge and turbidity values were examined. In addition, the flow velocity was modelled (1D). The goal was to monitor the observed peaks concerning their temporal shift and to draw conclusions on the storage capacity of fine sediments in the river substrate. Moreover, detailed fine sediment depositions on gravel bars along the Inn river were monitored and the grain size distribution of the river bed was determined. The monitoring started already in April / November 2015 with the aim to survey and analyses the turbidity, suspended load and fine sediment deposits on gravel bars along the River Inn as well as its biota (macroinvertebrates and fish) for "undisturbed" conditions. The SSCs were measured in a pre-analysis and during the drawdown itself in the penstock and in the outlet channel with

  4. Characterization of Solids in Residual Wastes from Single-Shell Tanks at the Hanford Site, Washington, USA - 9277

    International Nuclear Information System (INIS)

    Krupka, Kenneth M.; Cantrell, Kirk J.; Schaef, Herbert T.; Arey, Bruce W.; Heald, Steve M.; Deutsch, William J.; Lindberg, Michael J.

    2009-01-01

    Solid-phase characterization methods have been used in an ongoing study of residual wastes (i.e., waste remaining after final retrieval operations) from the underground single-shell storage tanks 241-C-103, 241-C-106, 241-C-202, 241-C-203, and 241-S-112 at the U.S. Department of Energy's Hanford Site in Washington State. The results of studies completed to date show significant variability in the compositions of those residual wastes and the compositions, morphologies, and crystallinities of the individual phases that make up these wastes. These differences undoubtedly result from the various waste types stored and transferred in and out each tank and the sluicing and retrieval operations used for waste retrieval. Our studies indicate that these residual wastes are chemically-complex assemblages of crystalline and amorphous solids that contain contaminants as discrete phases and/or co-precipitated within oxide phases. Depending on the specific tank, various solids (e.g., gibbsite; boehmite; dawsonite; cancrinite; Fe oxides such as hematite, goethite, and maghemite; rhodochrosite; lindbergite; whewellite; nitratine; and numerous amorphous or poorly crystalline phases) have been identified by X-ray diffraction and scanning electron microscopy/energy dispersive X-ray spectroscopy in residual wastes studied to date. Our studies also show that contact of residual wastes with Ca(OH)2- and CaCO3-saturated aqueous solutions, which were used as surrogates for the compositions of pore-fluid leachants derived from young and aged cements respectively, may alter the compositions of solid phases present in the contacted wastes. Fe oxides/hydroxides have been identified in all residual wastes studied to date. They occur in these wastes as discrete particles, particles intergrown within a matrix of other phases, and surface coatings on other particles or particle aggregates. These Fe oxides/hydroxides typically contain trace concentrations of other transition metals, such Cr, Mn

  5. Nitrous oxide and methane emission in an artificial wetland treating polluted runoff from an agricultural catchment

    Science.gov (United States)

    Mander, Ülo; Tournebize, Julien; Soosaar, Kaido; Chaumont, Cedric; Hansen, Raili; Muhel, Mart; Teemusk, Alar; Vincent, Bernard

    2015-04-01

    An artificial wetland built in 2010 to reduce water pollution in a drained agricultural watershed showed real potential for pesticide and nitrate removal. The 1.2 ha off-shore wetland with a depth of from 0.1 to 1 m intercepts drainage water from a 450 ha watershed located near the village of Rampillon (03°03'37.3'' E, 48°32'16.7'' N, 70 km south-east of Paris, France). A sluice gate installed at the inlet makes it possible to close the wetland during the winter months (December - March), when no pesticides are applied and rainfall events are more frequent. The flow entering the wetland fluctuates from 0 to 120 L/s. The wetland is partially covered by Carex spp., Phragmites australis, Juncus conglomeratus, Typha latifolia and philamentous algae. Since 2011, an automatic water quality monitoring system measures water discharge, temperature, dissolved O2, conductivity pH, NO3- and DOC in both inlet and outlet. In May 2014, an automatic weather station and Campbell Irgason system for the measurement of CO2 and H2O fluxes were installed in the middle of the wetland. In May and November 2014 one-week high frequency measurement campaigns were conducted to study N2O and CH4 fluxes using 6 manually operated opaque floating static chambers and 12 floating automatic dynamic chambers. The latter were operated via multiplexer and had an incubation time of 5 minutes, whereas the gas flow was continuously measured using the Aerodyne TILDAS quantum cascade laser system. During the campaign, the reduction of NO3- concentration was measured in nine reactor pipes. Also, water samples were collected for N2O and N2 isotope analysis, and sediments were collected for potential N2 emission measurements. In May, the hydraulic retention time (HRT) was 30 days, and the average NO3- concentration decreased from 24 in the inflow to 0 mg/L in the outflow. Methane flux was relatively high (average 1446, variation 0.2-113990 μg CH4-C m-2 h-1), while about 2/3 was emitted via ebullition

  6. Office of River Protection (ORP) Monthly Performance Report for September 2000

    International Nuclear Information System (INIS)

    WAGNILD, K.J.

    2000-01-01

    transfers and back-dilutions that remediated the flammable gas hazards and closed the surface level growth Unreviewed Safety Question (USQ) associated with the tank. CHG transitioned from the Basis for Interim Operation to the Final Safety Analysis Report (FSAR) in October 1999. The High Heat Safety Issue on tank 241-C-106 was resolved, including the removal of the tank from the watch list. Several cross-site waste transfers were completed to support saltwell pumping efforts. In addition, Evaporator Campaign 00-1 began in April 2000, resulting in an estimated waste volume reduction of 600,000 gallons. Final sluicing operations of tank 241-C-106 were completed on October 6, 1999. The sludge recovery goal of 95 percent was exceeded. The total sludge transfer from tank 241-C-106 to 241-AY-102 was 67.8 inches (186,500 gallons). The successful test of the AZ-101 mixer pump was completed, proving that CHG has the technology necessary to retrieve tank waste for treatment. Approval of the Notice of Construction (NOC) for the AN Farm tank retrieval system was received from the U.S Department of Energy (DOE) and the Environmental Protection Agency on July 21,2000. This is a significant step forward for Project W-211, ''Initial Tank Retrieval Systems'' in preparing waste for delivery to the Waste Treatment and Immobilization Plant

  7. PILOT-SCALE HYDRAULIC TESTING OF RESORCINOL FORMALDEHYDE ION EXCHANGE RESIN

    International Nuclear Information System (INIS)

    Adamson, D

    2007-01-01

    morphology. The skeletal density of the RF resin in the 24-inch IX Column increased slightly with cycling (in both hydrogen and sodium form). The chemical solutions used in the pilot-scale testing remained clear throughout testing, indicating very little chemical breakdown of the RF resin beads. The RF resin particles did not break down and produce fines, which would have resulted in higher pressure drops across the resin bed. Three cesium (Cs) loading tests were conducted on the RF resin in pilot-scale IX columns. Laboratory analyses concluded the Cs in the effluent never exceeded the detection limit. Therefore, there was no measurable degradation in cesium removal performance. Using the pilot-scale systems to add the RF resin to the columns and removing the resin from the columns was found to work well. The resin was added and removed from the columns three times with no operational concerns. Whether the resin was in sodium or hydrogen form, the resin flowed well and resulted in an ideal resin bed formation during each Resin Addition. During Resin Removal, 99+ % of the resin was easily sluiced out of the IX column. The hydraulic performance of the spherical RF resin during cycle testing was found to be superior to all other tested IX resins, and SRNL testing indicates that the resin should hold up to many cycles in actual radioactive Cs separation. The RF resin was found to be durable in the long term cycle testing and should result in a cost saving in actual operations when compared to other IX resins

  8. Right to know: reducing risks of fecal pathogen exposure for ED patients and staff.

    Science.gov (United States)

    Delaney, Molly Bridget

    2014-07-01

    The purpose of this article is to review the literature regarding the multiple challenges that contribute to ED bedside toileting and examine best practices that will reduce fecal exposure, cross-contamination among patients, and employee splash injuries. We searched the Cumulative Index to Nursing and Allied Health Literature, MEDLINE, and Cochrane database for information about the multiple challenges involved in bedside toileting, using the following search terms: bedside toileting, gastroenteritis, macerator, sluice machine, fecal pathogen exposure, and splash injury. In addition, costs and benefits of reusable versus disposable bedside toileting equipment were compared and contrasted. Emergency departments have a higher exposure rate to fecal pathogens with current methods of bedside toileting. Short incubation periods may not allow the proper lead time needed for patients to access primary care providers. As a result, emergency departments and urgent care centers become a likely point of entry into the health care system. Although most inpatient rooms have built-in bathrooms, most emergency departments and outpatient examination rooms do not. Although many patients are ambulatory, restrictive monitoring equipment is required. For safety reasons, staff must bring toileting equipment to the bedsides of both ambulatory and non-ambulatory patients. Hopper dependence creates longer walking distances and delays. These delays may lead to incontinence events, skin breakdown, more frequent bed changes, and higher linen and labor costs. Reusable bedside toileting equipment is associated with at-risk behaviors. Examples are procrastination and sanitization shortcuts. These behaviors risk cross-contamination of patients especially when urgent situations require equipment to be reused in the interim. ED patients and staff are 5 times more likely to undergo fecal exposure. The 5 phases of ED bedside toileting at which risks occur are as follows: equipment setup, transport

  9. PILOT-SCALE HYDRAULIC TESTING OF RESORCINOL FORMALDEHYDE ION EXCHANGE RESIN

    Energy Technology Data Exchange (ETDEWEB)

    Adamson, D

    2007-01-09

    morphology. The skeletal density of the RF resin in the 24-inch IX Column increased slightly with cycling (in both hydrogen and sodium form). The chemical solutions used in the pilot-scale testing remained clear throughout testing, indicating very little chemical breakdown of the RF resin beads. The RF resin particles did not break down and produce fines, which would have resulted in higher pressure drops across the resin bed. Three cesium (Cs) loading tests were conducted on the RF resin in pilot-scale IX columns. Laboratory analyses concluded the Cs in the effluent never exceeded the detection limit. Therefore, there was no measurable degradation in cesium removal performance. Using the pilot-scale systems to add the RF resin to the columns and removing the resin from the columns was found to work well. The resin was added and removed from the columns three times with no operational concerns. Whether the resin was in sodium or hydrogen form, the resin flowed well and resulted in an ideal resin bed formation during each Resin Addition. During Resin Removal, 99+ % of the resin was easily sluiced out of the IX column. The hydraulic performance of the spherical RF resin during cycle testing was found to be superior to all other tested IX resins, and SRNL testing indicates that the resin should hold up to many cycles in actual radioactive Cs separation. The RF resin was found to be durable in the long term cycle testing and should result in a cost saving in actual operations when compared to other IX resins.

  10. PILOT-SCALE HYDRAULIC TESTING OF RESORCINOL FORMALDEHYDE ION EXCHANGE RESIN

    Energy Technology Data Exchange (ETDEWEB)

    Adamson, D

    2006-11-08

    morphology. The skeletal density of the RF resin in the 24 inch IX Column increased slightly with cycling (in both hydrogen and sodium form). The chemical solutions used in the pilot-scale testing remained clear throughout testing, indicating very little chemical breakdown of the RF resin beads. The RF resin particles did not break down and produce fines, which would have resulted in higher pressure drops across the resin bed. Three cesium (Cs) loading tests were conducted on the RF resin in pilot-scale IX columns. Laboratory analyses concluded the Cs in the effluent never exceeded the detection limit. Therefore, there was no measurable degradation in cesium removal performance. Using the pilot-scale systems to add the RF resin to the columns and removing the resin from the columns was found to work well. The resin was added and removed from the columns three times with no operational concerns. Whether the resin was in sodium or hydrogen form, the resin flowed well and resulted in an ideal resin bed formation during each Resin Addition. During Resin Removal, 99+ % of the resin was easily sluiced out of the IX column. The hydraulic performance of the spherical RF resin during cycle testing was found to be superior to all other tested IX resins, and SRNL testing indicates that the resin should hold up to many cycles in actual radioactive Cs separation. The RF resin was found to be durable in the long term cycle testing and should result in a cost saving in actual operations when compared to other IX resins.

  11. WRPS Meeting The Challenge Of Tank Waste

    International Nuclear Information System (INIS)

    Britton, J.C.

    2012-01-01

    Washington River Protection Solutions (WRPS) is the Hanford tank operations contractor, charged with managing one of the most challenging environmental cleanup projects in the nation. The U.S. Department of Energy hired WRPS to manage 56 million gallons of high-level radioactive waste stored in 177 underground tanks. The waste is the legacy of 45 years of plutonium production for the U. S. nuclear arsenal. WRPS mission is three-fold: safely manage the waste until it can be processed and immobilized; develop the tools and techniques to retrieve the waste from the tanks, and build the infrastructure needed to deliver the waste to the Waste Treatment Plant (WTP) when it begins operating. WTP will 'vitrify' the waste by mixing it with silica and other materials and heating it in an electric melter. Vitrification turns the waste into a sturdy glass that will isolate the radioactivity from the environment. It will take more than 20 years to process all the tank waste. The tank waste is a complex highly radioactive mixture of liquid, sludge and solids. The radioactivity, chemical composition of the waste and the limited access to the underground storage tanks makes retrieval a challenge. Waste is being retrieved from aging single-shell tanks and transferred to newer, safer double-shell tanks. WRPS is using a new technology known as enhanced-reach sluicing to remove waste. A high-pressure stream of liquid is sprayed at 100 gallons per minute through a telescoping arm onto a hard waste layer several inches thick covering the waste. The waste is broken up, moved to a central pump suction and removed from the tank. The innovative Mobile Arm Retrieval System (MARS) is also being used to retrieve waste. MARS is a remotely operated, telescoping arm installed on a mast in the center of the tank. It uses multiple technologies to scrape, scour and rake the waste toward a pump for removal. The American Reinvestment and Recovery Act (ARRA) provided nearly $326 million over two

  12. Prediction ofWater Quality Parameters (NO3, CL in Karaj Riverby Usinga Combinationof Wavelet Neural Network, ANN and MLRModels

    Directory of Open Access Journals (Sweden)

    T. Rajaee

    2016-10-01

    Full Text Available IntroductionThe water quality is an issue of ongoing concern. Evaluation of the quantity and quality of running waters is considerable in hydro-environmental management.The prediction and control of the quality of Karaj river water, as one of the important needed water supply sources of Tehran, possesses great importance. In this study, Performance of Artificial Neural Network (ANN, Wavelet Neural Network combination (WANN and multi linear regression (MLR models, to predict next month the Nitrate (NO3 and Chloride (CL ions of "gate ofBylaqan sluice" station located in Karaj River has been evaluated. Materials and MethodsIn this research two separate ANN models for prediction of NO3 and CL has been expanded. Each one of the parameters for prediction (NO3 / CL has been put related to the past amounts of the same time series (NO3 / CL and its amounts of Q in past months.From astatisticalperiod of10yearswas usedforthe input of the models. Hence 80% of entire data from (96 initial months of data as training set, next 10% of data (12 months and 10% of the end of time series (terminal 12 months were considered as for validation and test of the models, respectively. In WANNcombination model, the real monthly observed time series of river discharge (Q and mentioned qualityparameters(NO3 / CL were decomposed to some sub-time series at different levels by wavelet analysis.Then the decomposed quality parameters to predict and Q time series were used at different levels as inputs to the ANN technique for predicting one-step-ahead Nitrate and Chloride. These time series play various roles in the original time series and the behavior of each is distinct, so the contribution to the original time series varies from each other. In addition, prediction of high NO3 and CL values greater than mean of data that have great importancewere investigated by the models. The capability of the models was evaluated by Coefficient of Efficiency (E and the Root Mean Square

  13. EDITORIAL: A physicist's journey to the centre of the Earth

    Science.gov (United States)

    Hipkin, Roger

    1999-07-01

    It is a paradox that, despite it being the planet on which all our experience is founded, the bulk Earth is as inaccessible as a remote galaxy. In South African diamond mines, man has penetrated about 3 km into the solid Earth; intact core from boreholes has been recovered from about 7 km and, in the Kola Peninsula of northern Russia, drill chippings have been sluiced up from about 13 km. Nevertheless, even if we had the resources to pepper the outer layer with exploratory boreholes, direct observation of the remaining 99% of the Earth's volume will always remain an impossibility. And yet we know some quite detailed properties of the interior of the Earth. Contrary to primitive cosmologies inspired by watching volcanoes erupt, and although below 2890 km there is a core of molten steel, we know that only in rare, shallow and isolated pockets are the rocks of the Earth's interior molten. The interior of the Earth is like an onion-skin: properties (density, electrical conductivity, sound speed etc) change mainly with depth. Taking the Earth's response to stress as one example, the material behaves like a brittle elastic solid only to depths of about 10-20 km. Below that, Earth materials exhibit the properties of both a solid and a liquid: to short-period effects like sound waves, they respond as a conventional solid but, when subjected to long-period stress, they can also flow like a liquid with a very high viscosity. Viscosity is initially controlled by the increasing mobility of atoms as temperature increases (viscosity decreases from about 1025 Pa s in the upper 20 km to about 1020 Pa s at a depth of 250 km); but atomic mobility is then offset by the counteracting effects of increasing pressure (viscosity increases to perhaps 1023 Pa s at 2500 km). We also have a quantitative physical picture of Earth behaviour stretching back over 4.5 billion years, despite having only 4500 years of recorded scientific observations about the Earth. Using the same physics that

  14. Developing a Simple Unique Head-Discharge Equation for Pivot Weirs with Different Side Contractions

    Directory of Open Access Journals (Sweden)

    neda Sheikh Rezazadeh Nikou

    2016-10-01

    unique head-discharge equation for pivot weirs based on dimension analysis and critical discharge equation (implementing Ferro rule. This equation can be used for different inclined angles and side contractions. The obtained unique and simple discharge equation can be used in automation of this structure. Material and Method: In this research, experimental data consist of experiments carried out in hydraulic research institute of Tehran, Iran and experiments of USBR on Pivot weir with side contraction in 0.925 in the canal with 1.14 m width and 0.46 m blade length (Wahlin and Replogle, 1994. Experiments of the water institute of Tehran were carried out in the concrete rectangular weir with 10.30m long, 1m wide and 1m depth (Fig.2. Experimental model was consisted of canals, water supply system, dampers (avoided of turbulent flow upstream of pivot weir, pivot weirs, sluice gate at the end of the channel (make different tail waters. With respect to laboratory equipment’s, three pivot weirs with of 80×65, 60×55 and 40×40 (cm×cm respectively length of the blade and the width was built and set 5.5 m far from the first of the canal. Discharge was determined from the calibrated weir located at the upstream of pivot weir. A manual point gauge with ±0.01 mm sensitivity was used to measure water surface levels. Extraction of discharge equation: Dimensional Analysis based on Ferro rule (2000 and 2001 is used to determine the discharge formula of pivot weirs. Since the h-Q function is usually exponential, the relation between dimensionless parameters could be defined as Ferro rule. Results and Discussion: The rating curve of the pivot weirs with different side contractions is compared with the normal suppressed rectangular weir (equal weir height in Fig. 3. The discharge of normal suppressed rectangular weir was calculated from the discharge equation of Kindsvater-Carter and discharge coefficient of Rehbock (1 for the equal weir height and head of pivot weirs. For a constant