  1. Operations Management on The Construction Site

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    this as a refreshing renewal and improvement of practical operations management at the site. However this paper will present a first step of development of a new approach to operations management at the building site, which at the same time builds on, and criticize lean construction for missing the point...... of the knowledge economy. This endeavour is carried out in two ways. First by a reading of the operations management literature. Juxtaposing this with lean construction extentions and the critique developed by other scholars. And also drawing on human resource management approaches. Second through a series......” scheme. In both directions it is revealed that the human resource and knowledge element of building processes is largely left untouched by lean construction methods. It is suggested to introduce at least two more dimensions of operations management at the site than the ones offered in lean construction...

  2. AUTOCAD IN THE OPERATIONAL MANAGEMENT OF THE CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Tsareva Marina Vladimirovna

    2016-04-01

    Full Text Available Operational management of the construction is usually based on information analysis systems, which are aimed at the monitoring of working schedule and volumes as consistent with predicated schedules. The result of such systems’ operation is traditional information graphics (diagrams, charts, etc., which provides idea on the current state of the construction site and deviations from the planned settings. The author considers the visualization technology of construction of objects using an image of the situation on the AutoCAD drawings, converted into an interactive format. The article focuses on imperfections of the existing technologies of information support of the managers. The creation of unified IT platform is offered on the basis of CAD for creating an integrated information storage and visualization of the environment using electronic drawings and diagrams. Using interactive methods it is possible to illustrate the condition of almost any part of the construction project using these drawings and diagrams. E-drawings contain the basic information resources - estimates, plans, sections, specifications, technology, construction, etc. necessary for the calculation of indicators. The author proved that implementation of visualization is most efficient in case of electronic drawings in 3D format.

  3. Operations management for construction

    CERN Document Server

    March, Chris

    2009-01-01

    Students studying construction management and related subjects need to have a broad understanding of the major aspects of controlling the building processes. Operations Management for Construction is one of three textbooks (Business Organisation, Operations Management and Finance Control) written to systematically cover the field. Focusing on construction sites and operations which are challenging to run, Chris March explores issues such as the setting up of the site, the deciding of the methodology of construction, and the sequence of work and resourcing. As changing and increasing regulations affect the way sites are managed, he also considers the issues and methods of successful administering, safety, quality and environment. Finally, the contractor's responsibility to the environment, including relationships with third parties, selection of materials, waste management and sustainability is discussed. Chris March has a wealth of practical experience in the construction industry, as well as considerable exp...

  4. Environmental Assessment for the construction and operation of the Health Physics Site Support Facility on the Savannah River Site

    International Nuclear Information System (INIS)

    1995-07-01

    DOE has prepared an environmental assessment for the proposed construction and operation of the Health Physics Site Support Facility on the Savannah River Site. This (new) facility would meet requirements of the site radiological protection program and would ensure site compliance with regulations. It was determined that the proposed action is not a major Federal action significantly affecting the quality of the environment within the meaning of NEPA. Therefore, a finding of no significant impact is made, and no environmental impact statement is needed

  5. Site operations

    International Nuclear Information System (INIS)

    House, W.B.; Ebenhack, D.G.

    1989-01-01

    This chapter is a discussion of the management and operations practices used at the Barnwell Waste Management Facility in Barnwell, SC. The following topics are discussed: (1) Waste receiving and inspection, including manifest and certificates of compliance, radiological surveys, disposition of nonconforming items, and decontamination and disposition of secondary waste streams; (2) Waste disposal, including Title 10 CFR 61 requirements, disposal area evaluations, shipment offloading, container emplacement, and radiation protection; (3) Trench closure, including trench backfilling, trench capping, and permanent markers; (4) Site maintenance and stabilization, including trench maintenance, surface water management, and site closure activities; (5) Site monitoring programs, including operational monitoring, and environmental monitoring program; (6) Personnel training and qualifications, including basic training program, safety training program, special skills training, and physical qualifications; (7) Records management, including waste records, personnel training records, personnel dosimetry records, site monitoring records, trench qualification and construction records, and site drawings and stabilization records; (8) Site security; (9) Emergency response plans; and (10) Quality assurance

  6. Construction site Voice Operated Information System (VOIS) test

    Science.gov (United States)

    Lawrence, Debbie J.; Hettchen, William

    1991-01-01

    The Voice Activated Information System (VAIS), developed by USACERL, allows inspectors to verbally log on-site inspection reports on a hand held tape recorder. The tape is later processed by the VAIS, which enters the information into the system's database and produces a written report. The Voice Operated Information System (VOIS), developed by USACERL and Automated Sciences Group, through a ESACERL cooperative research and development agreement (CRDA), is an improved voice recognition system based on the concepts and function of the VAIS. To determine the applicability of the VOIS to Corps of Engineers construction projects, Technology Transfer Test Bad (T3B) funds were provided to the Corps of Engineers National Security Agency (NSA) Area Office (Fort Meade) to procure and implement the VOIS, and to train personnel in its use. This report summarizes the NSA application of the VOIS to quality assurance inspection of radio frequency shielding and to progress payment logs, and concludes that the VOIS is an easily implemented system that can offer improvements when applied to repetitive inspection procedures. Use of VOIS can save time during inspection, improve documentation storage, and provide flexible retrieval of stored information.

  7. SYSTEM OF STANDARTIZATION OF CONSTRUCTION OPERATIONS ARRANGEMENT

    Directory of Open Access Journals (Sweden)

    Oleynik Pavel Pavlovich

    2012-10-01

    Full Text Available In the proposed article, management of construction operations is represented as a multi-level system; it is considered with the framework of projects including new construction, restructuring and overhaul of buildings and structures. The system of management of construction operations is to be composed of the following three constituent parts. They include a construction and assembling entity, project and operations, and a procurement base. Such matters as the quality of construction products, purchase (lease of building machinery and vehicles are incorporated into the level of the construction and assembling entity. The project level comprises such components of construction operations management as pre-construction preparation of a project, methods and forms of construction management, preparatory works, management of construction activities, real-time operations control, construction quality control, etc. The level of operations and the procurement base covers the needs for materials and equipment, their purchase and procurement, as well as the warehouse management. The main elements of the standardization system are identified. Standards of construction operations management are explained, including 1. General Provisions; 2. Preparation and performance of construction and assembling works; 3. New construction. Building site organization; 4. Demolition (dismantling of buildings and structures; 5. Rules of preparation for acceptance and commissioning of completed residential buildings. The prospects for the further development of the system of standardization of construction operations management are outlined

  8. PHWR safety: design, siting and construction

    International Nuclear Information System (INIS)

    Sharma, V.K.

    2002-01-01

    In all activities associated with NPPs viz. siting, design, construction, commissioning and operation, safety is given overriding importance. The safety design principles of PHWRs are based on defence-in-depth approach, physical and functional separation between process and safety systems and also among various safety systems, redundancy to meet single failure criteria and postulation of a number of design basis events for which the plant must be designed. Apart from engineered safety systems, PHWRs have inherent characteristics which contribute to safety. In siting of a NPP, it is required to ensure that the given site does not pose undue radiological hazard to public and the environment both during normal operation as well as during and following an accident condition. For this purpose, all site related external events, both natural and man induced, are assessed for their effect on the plant and are considered as part of the design basis. Possible radiological impact of the NPP on environment and surrounding population is assessed and ensured to be within acceptable limits. During construction phase, it is essential that the NPP be built in accordance with design intent and with required quality of workmanship to ensure that the NPP will remain safe during all states of operation. This is achieved through careful execution and QA activities encompassing all aspects of component fabrication at manufacturer works, civil construction, site erection, assembly, and commissioning. Future trends in nuclear safety will continue to be based on existing principles which have proved to be sound. These will be further strengthened by features such as increasing use of passive means of performing safety functions and a more explicit treatment of severe accidents. (author)

  9. Regulatory principles, criteria and guidelines for site selection, design, construction and operation of uranium tailings retention systems

    International Nuclear Information System (INIS)

    Coady, J.R.; Henry, L.C.

    1978-01-01

    Principles, criteria and guidelines developed by the Atomic Energy Control Board for the management of uranium mill tailings are discussed. The application of these concepts is considered in relation to site selection, design and construction, operation and decommissioning of tailings retention facilities

  10. Quality assurance during site construction. Pt. 6

    International Nuclear Information System (INIS)

    Schwarz, N.

    1980-01-01

    Scope of 'Site Construction concerning Electrical Equipment' (Installation, erection, commissioning, operation): tasks and organization of Siemens-Field Services Division; organization on site; receiving, incoming inspection and storage of material; installation, erection; (drawings, instructions, documents / execution of installation / personnel qualification). Non conformance and corrective actions; quality records; internal audits. (orig.)

  11. Site investigations, design, construction, operation, shutdown and surveillance of repositories for low- and intermediate-level radioactive wastes in rock cavities

    International Nuclear Information System (INIS)

    1984-01-01

    The report provides an overview and technical guidelines for considerations and for activities to be undertaken for safety assessment, site investigations, design, construction, operation, shutdown and surveillance of repositories for the disposal of low- and intermediate-level radioactive wastes in rock cavities. A generalized sequence of investigations is introduced which proceeds through region and site selection to the stage where the site is confirmed by detailed geoscientific investigations as being suitable for a waste repository. The different procedures and somewhat specific investigative needs with respect to existing mines are dealt with separately. General design, as well as specific requirements with respect to the different stages of design and construction, are dealt with. A review of activities related to the operational and post-operational stages of repositories in rock cavities is presented. The report describes in general terms the procedures related to different stages of disposal operation; also the conditions for shutdown together with essential shutdown and sealing activities and the related safety assessment requirements. Guidance is also given on the surveillance programme which will allow for inspection, testing, maintenance and security of a disposal facility during the operational phase, as well as for the post-operational stage for periods determined as necessary by the national authorities

  12. Activities on the site during construction phase

    International Nuclear Information System (INIS)

    Fickel, O.F.

    1977-01-01

    A survey is given of the work done on the site from site-opening till turn over of the plant to the client. After a short introduction to time schedules, manpower on site, site facilities and civil work and constructions, the commissioning and trial operation phase is discussed in detail. This phase begins with finishing the assembly of individual systems and components and ends with the trial operation and the acceptance measurement. During this period the subsystems are started-up in a useful sequence, first from cold, then from hot conditions and are finally operated as a total with nuclear energy. The single steps are: a) commissioning of indivudal systems; b) hot functional test 1 (without fuels) c) baseline inspection at the reactor pressure vessel; d) hot functional test 2 (with fuels); e) preparation for first criticality; f) postcriticality test program; g) trial operation: h) acceptance measurement. (HP) [de

  13. Smooth Operator - Mobile Information Technology for Improved Flow at the Construction Site

    DEFF Research Database (Denmark)

    Tambo, Torben

    2010-01-01

    is used; mobility is classified as remote, local or micro. Furthermore an extensive literature study is employed along with both market screening for systems and case studies of companies adopting as well as rejecting the technology. Both within research communities, software manufacturers......Mobile information technology (IT) seems an ideal innovation to promote effectiveness of the construction process, particularly at the construction site; research has over the last 15 years focused on solutions, potentials and barriers with this field. This paper aim at the duality between research...... and industry for an updated and forward looking comprehension, and view of tendencies, of the roles and potentials of mobile IT at the construction site including potential for further research. Qualitative and interpretive methodology inspired by information systems and sociology of research and construction...

  14. Environmental assessment for the construction, operation, and decommissioning of the Waste Segregation Facility at the Savannah River Site

    International Nuclear Information System (INIS)

    1998-01-01

    This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the construction, operation and decontamination and decommissioning (D ampersand D) of the Waste Segregation Facility (WSF) for the sorting, shredding, and compaction of low-level radioactive waste (LLW) at the Savannah River Site (SRS) located near Aiken, South Carolina. The LLW to be processed consists of two waste streams: legacy waste which is currently stored in E-Area Vaults of SRS and new waste generated from continuing operations. The proposed action is to construct, operate, and D ampersand D a facility to process low-activity job-control and equipment waste for volume reduction. The LLW would be processed to make more efficient use of low-level waste disposal capacity (E-Area Vaults) or to meet the waste acceptance criteria for treatment at the Consolidated Incineration Facility (CIF) at SRS

  15. Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site

    International Nuclear Information System (INIS)

    2003-01-01

    This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF 6 ) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF 6 stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the ''Federal Register'' (FR) on September 18, 2001 (''Federal Register'', Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF 6 conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (''United States Code'', Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (''Code of Federal Regulations'', Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF 6 conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a ''Federal Register'' Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (DandD) of the proposed conversion facility at three alternative locations within the Paducah site; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products

  16. Integrated safety analysis to operate while constructing Urenco USA

    International Nuclear Information System (INIS)

    Kohrt, Rick; Su, Shiaw-Der; Lehman, Richard

    2013-01-01

    The URENCO USA (UUSA) site in Lea County, New Mexico, USA is authorized by the U.S. Nuclear Regulatory Commission (NRC) for construction and operation of a uranium enrichment facility under 10 CFR 70 (Ref 1). The facility employs the gas centrifuge process to separate natural uranium hexafluoride (UF 6 ) feed material into a product stream enriched up to 5% U-235 and a depleted UF 6 stream containing approximately 0.2 to 0.34% U-235. Initial plant operations, with a limited number of cascades on line, commenced in the second half of 2010. Construction activities continue as each subsequent cascade is commissioned and placed into service. UUSA performed an Integrated Safety Analysis (ISA) to allow the facility to operate while constructing the remainder of the facility. The ISA Team selected the What-If/Checklist method based on guidance in NUREG-1513 (Ref 2) and AIChE Guidelines (Ref 3). Of the three methods recommended for high risk events HAZOP, What-If/Checklist, or Failure Modes and Effects Analysis (FMEA), the What-If/Checklist lends itself best to construction activities. It combines the structure of a checklist with an unstructured 'brainstorming' approach to create a list of specific accident events that could produce an undesirable consequence. The What-If/Checklist for Operate While Constructing divides the UUSA site into seven areas and creates what-if questions for sixteen different construction activities, such as site preparation, external construction cranes, and internal construction lifts. The result is a total of 112 nodes, for which the Operate While Constructing ISA Team created hundreds of what-if questions. For each what-if question the team determined the likelihood, consequences, safeguards, and acceptability of risk. What-if questions with unacceptable risk are the accident sequences and their selected safeguards are the Items Relied on For Safety (IROFS). The final ISA identified four (4) new accident sequences that, unless

  17. Genetic algorithm optimization for dynamic construction site layout planning

    Directory of Open Access Journals (Sweden)

    Farmakis Panagiotis M.

    2018-02-01

    Full Text Available The dynamic construction site layout planning (DCSLP problem refers to the efficient placement and relocation of temporary construction facilities within a dynamically changing construction site environment considering the characteristics of facilities and work interrelationships, the shape and topography of the construction site, and the time-varying project needs. A multi-objective dynamic optimization model is developed for this problem that considers construction and relocation costs of facilities, transportation costs of resources moving from one facility to another or to workplaces, as well as safety and environmental considerations resulting from facilities’ operations and interconnections. The latter considerations are taken into account in the form of preferences or constraints regarding the proximity or remoteness of particular facilities to other facilities or work areas. The analysis of multiple project phases and the dynamic facility relocation from phase to phase highly increases the problem size, which, even in its static form, falls within the NP (for Nondeterministic Polynomial time- hard class of combinatorial optimization problems. For this reason, a genetic algorithm has been implemented for the solution due to its capability to robustly search within a large solution space. Several case studies and operational scenarios have been implemented through the Palisade’s Evolver software for model testing and evaluation. The results indi­cate satisfactory model response to time-varying input data in terms of solution quality and computation time. The model can provide decision support to site managers, allowing them to examine alternative scenarios and fine-tune optimal solutions according to their experience by introducing desirable preferences or constraints in the decision process.

  18. Environmental assessment for the resiting, construction, and operation of the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This environmental assessment (EA) presents estimated environmental impacts from the resiting, construction, and operation of the US Department of Energy`s (DOE`s) Environmental and Molecular Sciences Laboratory (EMSL), which is proposed to be constructed and operated on land near the south boundary of the Hanford Site near Richland, Washington. The EMSL, if constructed, would be a modern research facility in which experimental, theoretical, and computational techniques can be focused on environmental restoration problems, such as the chemical and transport behavior of complex mixtures of contaminants in the environment. The EMSL design includes approximately 18,500 square meters (200,000 square feet) of floor space on a 12-hectare (30-acre) site. The proposed new site is located within the city limits of Richland in north Richland, at the south end of DOE`s 300 Area, on land to be deeded to the US by the Battelle Memorial Institute. Approximately 200 persons are expected to be employed in the EMSL and approximately 60 visiting scientists may be working in the EMSL at any given time. State-of-the-art equipment is expected to be installed and used in the EMSL. Small amounts of hazardous substances (chemicals and radionuclides) are expected to be used in experimental work in the EMSL.

  19. Construction on a new deep ice coring site at Dome Fuji Station -Operations carried out by the JARE-44 Dome Fuji overwintering team-

    Directory of Open Access Journals (Sweden)

    Takao Kameda

    2005-07-01

    Full Text Available Eight members of the 44th Japanese Antarctic Research Expedition (JARE-44 stayed at Dome Fuji Station (77°19′01″S, 39°42′11″E; 3810 m a.s.l.; ice thickness 3028±15 m; mean air temperature -54.4°C; lowest air temperature -79.7°C from January 19, 2003 to January 25, 2004 for glaciological, meteorological, and upper atmospheric observations, and for construction at a new ice coring site for deep ice coring. The construction was a continuation of the activities of JARE-43; JARE-44 primarily carried out interior work at the ice coring site. The following works were carried out during the overwintering period and are described in this paper: retrieval of casing pipes from the borehole, enlargement of the borehole, insertion of casing pipes into the borehole, movement of the winch system from the old to the new ice coring sites (44.5 m apart, floor construction, construction and preparation of a 10 m depth pit for the rotating mast, construction of stairs between the old and the new ice coring sites, construction of working tables, assembling the mast and the small goliath crane, setting up a lifter, testing the winch system, setting the winch for the chip collector, cable replacement for deep ice coring, assembling of a deep ice core drill, adjustment of a rotating mast, enlargement of caves for ice core storage, and general electrical work in the new ice coring site. The total working time for the above operations was 593.5 person-days. Since the average working time was 6 h/day, the total working time was 3561 person-hours. Preparations for borehole temperature measurements in a 2503 m borehole and the ice coring operation that was mainly conducted by the JARE-45 team are briefly described.

  20. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  1. Behavior-based safety on construction sites: a case study.

    Science.gov (United States)

    Choudhry, Rafiq M

    2014-09-01

    This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in

  2. Quantifying Construction Site Sediment Discharge Risk and Treatment Potential

    Science.gov (United States)

    Ferrell, L.; Beighley, R. E.

    2006-12-01

    Dealing with soil erosion and sediment transport can be a significant challenge during the construction process due to the potentially large spatial and temporal extent and conditions of bare soils. Best Management Practices (BMP) are commonly used to eliminate or reduce offsite discharge of sediment. However, few efforts have investigated the time varying risk of sediment discharge from construction sites, which often have dynamic soil conditions and the potential for less than optimal BMP installations. The goal of this research is to improve the design, implementation and effectiveness of sediment and erosion control at construction sites using site specific, temporal distributions of sediment discharge risk. Sediment risk is determined from individual factors leading to sediment expert, such as rainfall frequency, the adequacy of BMP installations, and the extent and duration of bare soil conditions. This research specifically focuses on quantifying: (a) the effectiveness of temporary sediment and control erosion control BMPs in preventing, containing, and/or treating construction site sediment discharge at varying levels of "proper" installation, and (b) sediment discharge potential from construction sites during different phases of construction, (ex., disturbed earth operations). BMPs are evaluated at selected construction sites in southern California and at the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with soil depths up to 1 meter, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, potential less than optimal installations, and no treatment conditions. Soil conditions are also varied to represent site conditions during different phases of construction (i.e., loose lifts

  3. ANAEROBIC COMPOST CONSTRUCTED WETLANDS SYSTEM TECHNOLOGY - SITE ITER

    Science.gov (United States)

    In Fall 1994, anaerobic compost wetlands in both upflow and downflow configurations were constructed adjacent to and received drainage from the Burleigh Tunnel, which forms part of the Clear Creek/Central City Superfund site. The systems were operated over a 3 year period. The e...

  4. Environmental Assessment for Leasing Land for the Siting, Construction and Operation of a Commercial AM Radio Antenna at Los Alamos National Laboratory, Los Alamos, NM

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-02-16

    The United States (U.S.) Department of Energy (DOE) proposes to lease approximately 3 acres of land at the Los Alamos National Laboratory (LANL) on the southeast tip of Technical Area (TA) 54 for the siting, construction and operation of an AM radio broadcasting antenna. This Environmental Assessment (EA) has been developed in order to assess the environmental effects of the Proposed Action and No Action alternative. The Proposed Action includes the lease of land for the siting, construction and operation of an AM radio broadcasting antenna in TA-54, just north of Pajarito Road and State Highway 4. The No Action Alternative was also considered. Under the No Action Alternative, DOE would not lease land on LANL property for the siting and operation of an AM radio broadcasting antenna; the DOE would not have a local station for emergency response use; and the land would continue to be covered in native vegetation and serve as a health and safety buffer zone for TA-54 waste management activities. Other potential sites on LANL property were evaluated but dismissed for reasons such as interference with sensitive laboratory experiments. Potential visual, health, and environmental effects are anticipated to be minimal for the Proposed Action. The radio broadcasting antenna would be visible against the skyline from some public areas, but would be consistent with other man-made objects in the vicinity that partially obstruct viewsheds (e.g. meteorological tower, power lines). Therefore, the net result would be a modest change of the existing view. Electromagnetic field (EMF) emissions from the antenna would be orders or magnitude less than permissible limits. The proposed antenna construction would not affect known cultural sites, but is located in close proximity to two archaeological sites. Construction would be monitored to ensure that the associated road and utility corridor would avoid cultural sites.

  5. Construction experience at the Canonsburg UMTRA site

    International Nuclear Information System (INIS)

    Thiers, G.R.; Farnes, L.L.; Wathen, T.R.

    1985-01-01

    Construction of on-site stabilization for over 225,000 cubic yards of abandoned uranium mill tailings in Canonsburg, Pennsylvania, began in October 1983, and is scheduled to be completed in December 1985. This paper describes selected construction experience through October 1984. The following selected events and construction items are discussed in this paper: 1. Construction and operation of a 36,000-square foot, fabric-lined sedimentation basin, including difficulties associated with installation of the liner; 2. Assembly and start-up of the contaminated water treatment plant; 3. Construction of the encapsulation cell test fills, to confirm the performance specification governing the compaction; 4. Excavation, relocation, and placement of contaminated materials, including moisture control and density testing of the radioactive materials; 5. Construction difficulties, including disposition of local leachate from the abandoned industrial complex and an increase in the volume of contaminated material to be encapsulated

  6. Radiation dose to construction workers at operating nuclear power plant sites. Volume 2. Appendices A--F. Final report, September 1975--September 1978

    International Nuclear Information System (INIS)

    Endres, G.W.R.; Shipler, D.B.

    1978-12-01

    These appendices contain the dosimetry procedures and details of the personnel and environmental dosimeters used for the Radiation Dose to Construction Workers at Operating Nuclear Power Plant Sites Study. A printout of the computer codes used to analyze dosimeter data is included along with all the raw data obtained. Appendices C through F contain computer output and log-normal plots of dosimetry data for environmental location and construction worker groups

  7. Construction and operation of a tritium extraction facility at the Savannah River Site. Final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    DOE proposes to construct and operate a Tritium Extraction Facility (TEF) at H Area on the Savannah River Site (SRS) to provide the capability to extract tritium from commercial light water reactor (CLWR) targets and from targets of similar design. The proposed action is also DOE's preferred alternative. An action alternative is to construct and operate TEF at the Allied General Nuclear Services facility, which is adjacent to the eastern side of the SRS. Under the no-action alternative DOE could incorporate tritium extraction capabilities in the accelerator for production of tritium. This EIS is linked to the Final Programmatic Environmental Impact Statement for Tritium Supply and Recycling, from which DOE determined that it would produce tritium either in an accelerator or in a commercial light water reactor. The purpose of the proposed action and alternatives evaluated in this EIS is to provide tritium extraction capability to support either tritium production technology. The EIS assesses the environmental impacts from the proposed action and the alternatives, including the no action alternative

  8. Critical management practices influencing on-site waste minimization in construction projects.

    Science.gov (United States)

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  9. New Reactor Siting, Licensing and Construction Experience. Proceedings of the 2. CNRA International Workshop on 'New Reactor Siting, Licensing and Construction Experience'

    International Nuclear Information System (INIS)

    2013-01-01

    This report documents the proceedings from the 2. Workshop on New Reactor Siting, Licensing and Construction Experience. A total of 45 specialists from 16 countries and international organisations attended. The meeting was sponsored by the OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities and hosted by the US Nuclear Regulatory Commission (U.S.NRC). The objectives of the workshop were to provide a forum to exchange information on lessons learned from siting, licensing and constructing new nuclear power plants around the world. Key focus areas included siting practices and regulatory positions that have been enhanced as a result of the Fukushima accident; lessons learned from licensing and design review approaches and challenges, construction experience and recommendations for regulatory oversight; and regulatory cooperation on generic and design specific issues through the MDEP specific working groups. The workshop was structured in 4 technical sessions, each followed by ample time for panel discussions. The first technical session was devoted to regulatory cooperation on generic and design specific issues, MDEP working groups (EPR, AP1000), vendor inspection co-operation, digital I and C, and codes and standards. The second technical session was intended to discuss and share regulatory positions on siting practices and enhancements as a result of lessons learned from Fukushima accident. The third technical session addressed the construction experience and regulatory oversight of new reactor construction activities. And the fourth technical session included presentations on the lessons learned from regulatory licensing reviews of new reactor designs

  10. ANAEROBIC COMPOST CONSTRUCTED WETLANDS SYSTEM TECHNOLOGY - SITE TECHNOLOGY CAPSULE

    Science.gov (United States)

    In fall 1994, anaerobic compost wetlands in both upflow and down flow configurations were constructed adjacent to and received drainage from the Burleigh tunnel, which forms part of the Clear Creek/Central City Superfund site. The systems were operated over a 3 year period. The ...

  11. Accident Causal Factors on the Building Construction Sites: A Review

    Directory of Open Access Journals (Sweden)

    Opeyemi Samuel Williams

    2018-01-01

    Full Text Available The concerns for cost, quality and timely delivery of projects have been in existence from time immemorial, whereas the passion for these should be extended to safe execution of site works by the construction participants, as safety of life is very paramount. However, high level of commitment that is essential for the safe execution of site works has become a taboo. Hence, a plethora of accidents takes place on the site ranging from falls from height, contact with working tools, vehicle-related, slip and trip, collapse, exposure to harmful substances, to lifting and handling object accidents. It is pertinent to know that, responsibility for accidents on site cuts across all project participants (clients, consultants, contractors, workers, as well as the construction site environment. Recognition of the construction participants and site environmental factors as agents of accident is the focus of this research. Through extensive review of literature, a copious number of factors were identified and subsequently grouped under five factors as client-related, consultant-related, contractor-related, construction workers-related, and construction site-related. However, there has been a dearth of research in the grouping of accident contributing factors. The identification and understanding of these factors will go a long way in mitigating construction accidents, coupled with proven measures taken in positively addressing them. Efforts to prevent these causative factors include inter alia elimination of hazards from design, effective safety management, adequate planning of activities and employment of seasoned professionals by the client. The contractors are to embark on staff safety auditing, set up safety committees, conduct regular training for staff, use innovative technology, uphold housekeeping and report accident occurrence, while strict adherence to safety regulations must be adopted by all construction operatives.

  12. Biological assessment of the effects of construction and operation of a depleted uranium hexafluoride conversion facility at the Paducah, Kentucky, site.

    Energy Technology Data Exchange (ETDEWEB)

    Van Lonkhuyzen, R.

    2005-09-09

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF{sub 6}) Management Program evaluated alternatives for managing its inventory of DUF{sub 6} and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF{sub 6} PEIS) in April 1999 (DOE 1999). The DUF{sub 6} inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF{sub 6} PEIS, DOE stated its decision to promptly convert the DUF6 inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF{sub 6} conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF{sub 6} cylinders stored at ETTP to the Portsmouth site for conversion. This biological assessment (BA) has been prepared by DOE, pursuant to the National Environmental Policy Act of 1969 (NEPA) and the Endangered Species Act of 1974, to evaluate potential impacts to federally listed species from the construction and operation of a conversion facility at the DOE Paducah site.

  13. THREE-DIMENSIONAL GEOFILTRATIONAL MODEL OF THE ROGUN HYDRO POWER PLANT CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Khokhotva Sergey Nikolaevich

    2017-05-01

    Full Text Available The article deals with technique of creation and results of calculations of the three-dimensional geofiltrational model of the Rogun HPP construction site. When performing works on creation of the Rogun HPP three-dimensional geofiltration model, geological and hydrogeological conditions of the Rogun HPP construction site were analyzed. They showed that the construction site consists mostly of fractured rocks of various weathering degrees. In terms of preservation, four preservation zones were identified in the rock mass. These zones define the features of hydrogeological conditions that have emerged in the area of construction. Calculation results illustrated the absence of seepage areas on the lower slope of dam; this is the indication of normal operation of the dam impervious circuit. The drainage system of the underground hydropower plant has a high efficiency. Operation of the drainage galleries complex leads to a significant reduction of piezometric pressure on roofs of the machine and transformer halls. Above the underground structures a completely drained area is formed. Completed forecast calculations on geofiltration model of the Rogun hydropower plant determine the hydrostatic pressure and piezometric pressure at any point of the modeled area. These data can be used as loads while designing of lining of underground workings.

  14. A GIS analysis of suitability for construction aggregate recycling sites using regional transportation network and population density features

    Science.gov (United States)

    Robinson, G.R.; Kapo, K.E.

    2004-01-01

    Aggregate is used in road and building construction to provide bulk, strength, support, and wear resistance. Reclaimed asphalt pavement (RAP) and reclaimed Portland cement concrete (RPCC) are abundant and available sources of recycled aggregate. In this paper, current aggregate production operations in Virginia, Maryland, and the District of Columbia are used to develop spatial association models for the recycled aggregate industry with regional transportation network and population density features. The cost of construction aggregate to the end user is strongly influenced by the cost of transporting processed aggregate from the production site to the construction site. More than 60% of operations recycling aggregate in the mid-Atlantic study area are located within 4.8 km (3 miles) of an interstate highway. Transportation corridors provide both sites of likely road construction where aggregate is used and an efficient means to move both materials and on-site processing equipment back and forth from various work sites to the recycling operations. Urban and developing areas provide a high market demand for aggregate and a ready source of construction debris that may be processed into recycled aggregate. Most aggregate recycling operators in the study area are sited in counties with population densities exceeding 77 people/km2 (200 people/mile 2). No aggregate recycling operations are sited in counties with less than 19 people/km2 (50 people/mile2), reflecting the lack of sufficient long-term sources of construction debris to be used as an aggregate source, as well as the lack of a sufficient market demand for aggregate in most rural areas to locate a recycling operation there or justify the required investment in the equipment to process and produce recycled aggregate. Weights of evidence analyses (WofE), measuring correlation on an area-normalized basis, and weighted logistic regression (WLR), are used to model the distribution of RAP and RPCC operations relative

  15. Engineered surface barriers for waste disposal sites: lysimeter facility design and construction

    International Nuclear Information System (INIS)

    Phillips, S.J.; Ruben, M.S.; Kirkham, R.R.

    1988-01-01

    A facility to evaluate performance of engineered surface carriers for confinement of buried wastes has been designed, constructed, and operations initiated. The Field Lysimeter Test Facility is located at the US Department of Energy's Hanford Site in Richland, Washington. The facility consists of 18 one-dimensional drainage and weighing lysimeters used to evaluate 7 replicated barrier treatments. Distinct layers of natural earth materials were used to construct layered soil and rock barriers in each lysimeter. These barrier designs are capable in principal of significantly reducing or precluding infiltration of meteoric water through barriers into underlying contaminated zones. This paper summarizes salient facility design and construction features used in testing of the Hanford Site's engineered surface barriers

  16. Biological assessment of the effects of construction and operation of a depleted uranium hexafluoride conversion facility at the Portsmouth, Ohio,site

    International Nuclear Information System (INIS)

    Van Lonkhuyzen, R.

    2005-01-01

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF 6 ) Management Program evaluated alternatives for managing its inventory of DUF 6 and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF 6 PEIS) in April 1999 (DOE 1999). The DUF 6 inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF 6 PEIS, DOE stated its decision to promptly convert the DUF 6 inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF 6 conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF 6 cylinders stored at ETTP to the Portsmouth site for conversion. This biological assessment (BA) has been prepared by DOE, pursuant to the National Environmental Policy Act of 1969 and the Endangered Species Act of 1974, to evaluate potential impacts to federally listed species from the construction and operation of a conversion facility at the DOE Portsmouth site. The Indiana bat is known to occur in the area of the Portsmouth site and may potentially occur on the site during spring or summer. Evaluations of the Portsmouth site indicated that most of the site was found to have poor summer habitat for the Indiana bat because of the small size, isolation, and insufficient maturity of the few woodlands on the site. Potential summer habitat for the Indiana bat was identified outside the developed area bounded by Perimeter Road, within the corridors

  17. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Site layout, site-specific erection plan and construction... Steel Erection § 1926.752 Site layout, site-specific erection plan and construction sequence. (a... strength or sufficient strength to support the loads imposed during steel erection. (c) Site layout. The...

  18. Management of construction safety at RR site

    International Nuclear Information System (INIS)

    Pathak, B.C.; Khatsuriya, J.R.

    2016-01-01

    Construction industries are one of the most hazardous industries and hence, promotion of safety remains one of the greatest challenges facing construction industry today. According to ILO estimates: Each year at least 60,000 fatal accidents occur on construction sites around the world or one fatal accident every ten minutes. One in six fatal accidents at work occurs on a construction site. In industrialized countries, as many as 25-40 per cent of work related deaths occur on construction sites, even though the sector employs only 6-10 per cent of the workforce. The number of fatalities occurring from construction work in India is also quite disturbing. Though, the fall of person from height and through openings were the major causes for fatal /serious accidents, the risk of fatal accident involving material handling equipment, either during handling or its maintenance is also significantly high due to use of large number of material handling equipments during construction work. (author)

  19. AN/FSY-3 Space Fence System – Sensor Site One/Operations Center Integration Status and Sensor Site Two Planned Capability

    Science.gov (United States)

    Fonder, G. P.; Hack, P. J.; Hughes, M. R.

    This paper covers two topics related to Space Fence System development: Sensor Site One / Operations Center construction and integration status including risk reduction integration and test efforts at the Moorestown, NJ Integrated Test Bed (ITB); and the planned capability of Sensor Site Two. The AN/FSY-3 Space Fence System is a ground-based system of S-band radars integrated with an Operations Center designed to greatly enhance the Air Force Space Surveillance network. The radar architecture is based on Digital Beam-forming. This capability permits tremendous user-defined flexibility to customize volume surveillance and track sectors instantaneously without impacting routine surveillance functions. Space Fence provides unprecedented sensitivity, coverage and tracking accuracy, and contributes to key mission threads with the ability to detect, track and catalog small objects in LEO, MEO and GEO. The system is net-centric and will seamlessly integrate into the existing Space Surveillance Network, providing services to external users—such as JSpOC—and coordinating handoffs to other SSN sites. Sensor Site One construction on the Kwajalein Atoll is in progress and nearing completion. The Operations Center in Huntsville, Alabama has been configured and will be integrated with Sensor Site One in the coming months. System hardware, firmware, and software is undergoing integration testing at the Mooretown, NJ ITB and will be deployed at Sensor Site One and the Operations Center. The preliminary design for Sensor Site Two is complete and will provide critical coverage, timeliness, and operational flexibility to the overall system.

  20. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  1. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  2. Environmental assessment report: Nuclear Test Technology Complex. [Construction and operation of proposed facility

    Energy Technology Data Exchange (ETDEWEB)

    Tonnessen, K.; Tewes, H.A.

    1982-08-01

    The US Department of Energy (USDOE) is planning to construct and operate a structure, designated the Nuclear Test Technology Complex (NTTC), on a site located west of and adjacent to the Lawrence Livermore National Laboratory. The NTTC is designed to house 350 nuclear test program personnel, and will accommodate the needs of the entire staff of the continuing Nuclear Test Program (NTP). The project has three phases: land acquisition, facility construction and facility operation. The purpose of this environmental assessment report is to describe the activities associated with the three phases of the NTTC project and to evaluate potential environmental disruptions. The project site is located in a rural area of southeastern Alameda County, California, where the primary land use is agriculture; however, the County has zoned the area for industrial development. The environmental impacts of the project include surface disturbance, high noise levels, possible increases in site erosion, and decreased air quality. These impacts will occur primarily during the construction phase of the NTTC project and can be mitigated in part by measures proposed in this report.

  3. Studies on Labour Safety in Construction Sites

    Directory of Open Access Journals (Sweden)

    S. Kanchana

    2015-01-01

    Full Text Available Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites.

  4. Studies on Labour Safety in Construction Sites

    Science.gov (United States)

    Kanchana, S.; Sivaprakash, P.; Joseph, Sebastian

    2015-01-01

    Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites. PMID:26839916

  5. Construction of vertex operators using operator formalism techniques

    International Nuclear Information System (INIS)

    Gato, B.; Massachusetts Inst. of Tech., Cambridge

    1989-01-01

    We derive vertex operators in oscillator form as an application of the conserved charges method developed by Vafa for the operator formalism in higher genus Riemann surfaces. This construction proves to be clear, direct and valid for the bosonic and fermionic strings as wells as for twisted strings on orbifolds. We discuss the method and construct vertex operators for the bosonic string moving on Z N orbifolds and for the fermionic string in the NSR formulation. (orig.)

  6. Effects of golf course construction and operation on water chemistry of headwater streams on the Precambrian Shield

    International Nuclear Information System (INIS)

    Winter, Jennifer G.; Dillon, Peter J.

    2005-01-01

    To investigate the effects of golf course construction and operation on the water chemistry of Shield streams, we compared the water chemistry in streams draining golf courses under construction (2) and in operation (5) to streams in forested reference locations and to upstream sites where available. Streams were more alkaline and higher in base cation and nitrate concentrations downstream of operational golf courses. Levels of these parameters and total phosphorus increased over time in several streams during golf course construction through to operation. There was evidence of inputs of mercury to streams on two of the operational courses. Nutrient (phosphorus and nitrogen) concentrations were significantly related to the area of unmanaged vegetation in a 30 x 30 m area on either side of the sampling sites, and to River Bank Quality Index scores, suggesting that maintaining vegetated buffers along the stream on golf courses will reduce in-stream nutrient concentrations. - Golf course construction and operation had a significant impact on alkalinity, nitrogen and base cation concentrations of streams

  7. Experience from the construction and operation of Tarapur and Rajasthan Nuclear Power Stations

    International Nuclear Information System (INIS)

    Shah, J.C.; Pardiwala, T.F.; Kothare, V.V.; Rao, M.H.P.; Nanjundeswaran, K.

    1977-01-01

    India's experience in construction and operation of nuclear power stations so far covers two BWR and four PHWR Units in three power stations. Two more PHWR units are at an early stage of construction. The twin unit Tarapur Station (2x210 MWe BWR) was built as a turnkey project which restricted participation of Indian engineers in design and construction considerably. The contrasting approach adopted for Rajasthan Station (2x220 MWe PHWR) involved Indian personnel and contractors fully in construction and commissioning, with Canadians providing supervisory assistance in Rajasthan I and essentially consultative help for Rajasthan II. Subsequent stations are wholly Indian efforts. Tarapur went into commercial operation in 1969, 60 months after breaking of ground. Construction was essentially uneventful, major problems faced being stress corrosion induced cracks in the reactor lining and complete change of steam generator tubes. In its seven years of operations, Tarapur has faced several problems mainly arising from rather early designs, indifferent fuel performance, constraints of twin-unit approach and operations in an inadequately developed grid system apart from those generally stemming from assimilation of an advanced technology in a developing country. The Station has undergone six refuellings during this period. Most of the problems have been overcome by design changes, system augmentations and experience and the Station operation since mid 1974 have generally been steady at around 90% of the rated capacity. Construction of Rajasthan I at a remote and isolated site proceeded relatively slowly. Local availability of skilled and semi-skilled manpower was poor, affecting construction. Inadequate roads impeded movements of overdimensioned components. Observing strict Quality Assurance standards required several major rectifications at site. Rajasthan I went on line in 1973 after overcoming major turbine bearing problems during commissioning. Since then, while

  8. Construction Minerals Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes construction minerals operations in the United States. The data represent commodities covered by the Minerals Information Team (MIT) of the...

  9. Wetland assessment of the effects of construction and operation of a depleted uranium hexafluoride conversion facility at the Portsmouth, Ohio, site

    International Nuclear Information System (INIS)

    Van Lonkhuyzen, R.

    2005-01-01

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF 6 ) Management Program evaluated alternatives for managing its inventory of DUF 6 and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF 6 PEIS) in April 1999 (DOE 1999). The DUF 6 inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF 6 PEIS, DOE stated its decision to promptly convert the DUF 6 inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF 6 conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF 6 cylinders stored at ETTP to the Portsmouth site for conversion. This wetland assessment has been prepared by DOE, pursuant to Executive Order 11990 (''Protection of Wetlands'') and DOE regulations for implementing this Executive Order as set forth in Title 10, Part 1022, of the ''Code of Federal Regulations'' (10 CFR Part 1022 [Compliance with Floodplain and Wetland Environmental Review Requirements]), to evaluate potential impacts to wetlands from the construction and operation of a conversion facility at the DOE Portsmouth site. Approximately 0.02 acre (0.009 ha) of a 0.08-acre (0.03-ha) palustrine emergent wetland would likely be eliminated by direct placement of fill material during facility construction at Location A. Portions of this wetland that are not filled may be indirectly affected by an altered hydrologic regime because of the

  10. Childhood leukaemia and non-Hodgkin's lymphoma near large rural construction sites, with a comparison with Sellafield nuclear site

    International Nuclear Information System (INIS)

    Kinlen, L.J.; Dickson, M.; Stiller, C.A.

    1995-01-01

    The objective was to determine whether population mixing produced by large, non-nuclear construction projects in rural areas is associated with an increase in childhood leukaemia and non-Hodgkin's lymphoma. A study was undertaken of the incidence of leukaemia and non-Hodgkin's lymphoma among children living near large construction projects in Britain since 1945, situated more than 20 km from a population centre, involving a workforce of more than 1000, and built over three or more calendar years. A 37% excess of leukaemia and non-Hodgkin's lymphoma at 0-14 years of age was recorded during construction and the following calendar year. The excesses were greater at times when construction workers and operating staff overlapped (72%), particularly in areas of relatively high social class. For several sites the excesses were similar to or greater than that near the nuclear site of Sellafield (67%), which is distinctive in its large workforce with many construction workers. Seascale, near Sellafield, with a ninefold increase had an unusually high proportion of residents in social class I. The findings support the infection hypothesis and reinforce the view that the excess of childhood leukaemia and non-Hodgkin's lymphoma near Sellafield has a similar explanation. (author)

  11. Draft environmental impact statement siting, construction, and operation of New Production Reactor capacity. Volume 4, Appendices D-R

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.

  12. Survey dataset on occupational hazards on construction sites

    Directory of Open Access Journals (Sweden)

    Patience F. Tunji-Olayeni

    2018-06-01

    Full Text Available The construction site provides an unfriendly working conditions, exposing workers to one of the harshest environments at a workplace. In this dataset, a structured questionnaire was design directed to thirty-five (35 craftsmen selected through a purposive sampling technique on various construction sites in one of the most populous cities in sub-Saharan Africa. The set of descriptive statistics is presented with tables, stacked bar chats and pie charts. Common occupational health conditions affecting the cardiovascular, respiratory and musculoskeletal systems of craftsmen on construction sites were identified. The effects of occupational health hazards on craftsmen and on construction project performance can be determined when the data is analyzed. Moreover, contractors’ commitment to occupational health and safety (OHS can be obtained from the analysis of the survey data. Keywords: Accidents, Construction industry, Craftsmen, Health, Occupational hazards

  13. Development of OSSA(Operation Service Support Agreement) Simulator and Site Acceptance Test

    Energy Technology Data Exchange (ETDEWEB)

    Park, DaeSeung; Ahn, Sung-Jin; Lee, Jong-Beom [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Building the nuclear power plant is on the schedule, remaining question is who could operate the NPP after the construction is finished. OSSA is known as Operation Service Support Agreement, it is the contract between KHNP(Korea Hydro and Nuclear Power Co.,) and ENEC(Emirates Nuclear Energy Corporation) for United Arab Emirates Nuclear Power Plant operations support. The contract is mostly about the safety and reliability operations and as well as of the training of UAE operators to have better experiences. UAE operators needed to be trained and tested before they come to UAE for operate the NPP. The OSSA simulator was built because operator shall not make any mistakes even if the plant is not yet constructed. Simulator Training is a key for getting experiences without operating the actual plant, because the nuclear power plant never used as the test in real situations. Operators’ requirement is to have more than 2 years at site experiences and also they have to be trained 5 to 8 months of the training. The experience such as the site acceptance test will lead the future nuclear industry to meet the global standard and to lead the safety of the NPP. Under the OSSA agreement 400 KHNP experts will support the operations. Most of the operators were trained at the OSSA simulator which is most reliable simulator that can demonstrate satisfactory performance for the simulator.

  14. Environmental considerations associated with siting, constructing, and operating a special isotope separation plant at INEL: Volume 1, Proceedings: Report of public hearings

    International Nuclear Information System (INIS)

    1987-03-01

    This report documents the two public hearings conducted for the purpose of determining the scope of issues to be addressed in relation to the siting, constructing, and operating of a special isotope separation plant at INEL. The report includes transcripts of the public hearings held in Idaho Falls, Idaho, February 24, 1987, and in Boise, Idaho, February 26, 1987, and includes the exhibits of records relating to those hearings. The review and hearing process meets pertinent National Environmental Policy Act (NEPA) requirements, Council on Environmental Quality (CEQ) regulations, and DOE guidelines

  15. Environmental considerations associated with siting, constructing, and operating a special isotope separation plant at INEL: Volume 2, Proceedings: Report of public hearings

    International Nuclear Information System (INIS)

    1987-03-01

    This report documents the two public hearings conducted for the purpose of determining the scope of issues to be addressed in relation to the siting, constructing, and operating of a special isotope separation plant at INEL. The report includes transcripts of the public hearings held in Idaho Falls, Idaho, February 24, 1987, and in Boise, Idaho, February 26, 1987, and includes the exhibits of record relating to those hearings. The review and hearing process meets pertinent National Environmental Policy Act (NEPA) requirements, Council on Environmental Quality (CEQ) regulations, and DOE guidelines

  16. A selective study of Information technologies to improve operations efficiency in construction

    Directory of Open Access Journals (Sweden)

    Konikov Alexandr

    2018-01-01

    Full Text Available Today, information technologies (IT are used in almost every production industry. While the aspects of IT are well studied and discussed in relevant monographs, articles, web sources, etc., this paper reviews the performance improvement options in the construction industry by leveraging IT. From a wide range of information technologies the author has picked the most relevant solutions, from his point of view, based on several considerations, the most important one being the lack of adequate attention to these technologies specifically in the construction industry. The paper covers the following technologies: Big Data (a smart technology for high-speed processing of huge and diverse data arrays; situation centers (SC for construction and operations projects (SCs are successfully used in other industries for operating control of sophisticated facilities; data warehouses (DW for the construction industry (DWs are viewed as a standalone project rather than a supplement to Data Mining or Big Data; operational and dispatch radio communication service (radio communication can ensure instant connectivity between several subscribers; VSAT (a satellite technology for prompt connection of a distant construction site with the 'outer world' when no alternatives are available. The paper briefly presents the essence of each technology, describes the pre-requisites for its use in construction, outlines the key advantages, limits and shortcomings, and lists construction projects where it shall be worthwhile to use a specific technology projects.

  17. Event-based soil loss models for construction sites

    Science.gov (United States)

    Trenouth, William R.; Gharabaghi, Bahram

    2015-05-01

    The elevated rates of soil erosion stemming from land clearing and grading activities during urban development, can result in excessive amounts of eroded sediments entering waterways and causing harm to the biota living therein. However, construction site event-based soil loss simulations - required for reliable design of erosion and sediment controls - are one of the most uncertain types of hydrologic models. This study presents models with improved degree of accuracy to advance the design of erosion and sediment controls for construction sites. The new models are developed using multiple linear regression (MLR) on event-based permutations of the Universal Soil Loss Equation (USLE) and artificial neural networks (ANN). These models were developed using surface runoff monitoring datasets obtained from three sites - Greensborough, Cookstown, and Alcona - in Ontario and datasets mined from the literature for three additional sites - Treynor, Iowa, Coshocton, Ohio and Cordoba, Spain. The predictive MLR and ANN models can serve as both diagnostic and design tools for the effective sizing of erosion and sediment controls on active construction sites, and can be used for dynamic scenario forecasting when considering rapidly changing land use conditions during various phases of construction.

  18. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  19. Design, construction, operation, shutdown and surveillance of repositories for solid radioactive wastes in shallow ground

    International Nuclear Information System (INIS)

    1984-01-01

    This report is a part of the IAEA publications under its Programme on Underground Disposal of Radioactive Wastes and is addressed to administrative and technical authorities and specialists who consider the shallow-ground disposal of low- and intermediate-level solid radioactive wastes of short half-lives. The report emphasizes the technological aspects, however it briefly discusses the safety philosophy and regulatory considerations too. The design, construction, operation, shutdown and surveillance of the repositories in shallow ground are considered in some detail, paying special attention to their interrelated aspects. In particular, a review is given of the following aspects: main design and construction considerations in relation to the natural features of the site; design and construction aspects during the repository development process; activities related to operational and post-operational stages of the repository; major steps in repository operation and essential activities in shutdown and operational and post-operational surveillance

  20. Traffic condition with road upgrading during construction and operation stages based on level-of-service (LOS)

    Science.gov (United States)

    Tay, A. C.; Lee, H. H.

    2018-04-01

    In this study, traffic survey was done at signalized intersection of both ends of an upgrading road during morning and afternoon peak hours throughout construction period. The intersections of Tudan Road located at Miri City in Sarawak State, Malaysia were chosen as study sites. The aim of this research was to investigate the traffic condition for the signalized intersections of a R3 secondary road that being upgrading to standard U5 dual carriageway during peak hours for construction and operation stages. Data collected from these sites were analyzed according to Highway Capacity Manual (HCM) 2010. From the results, the level-of-services (LOS) of Kuala Baram By Pass Road intersection improved from Level F to Level E at operation stage for weekday during peak hours in the morning. LOS of Lutong-Kuala Baram Road intersection at construction stage were Level C during peak hours in the morning and Level D during peak hours in the afternoon for weekends. However, the LOS during both peak hours for weekends were projected to improve to Level B at the operation stage. It proved that the road construction has affected LOS, and this temporary issue can be solved after the upgraded road is in operation.

  1. Turbidity monitoring at select MDOT construction sites.

    Science.gov (United States)

    2012-06-01

    The objective of this project was to establish baseline turbidity conditions at select construction : sites by establishing a water quality monitoring program and documenting MDOT approved : BMPs on site. In 2009 the United States Environmental Prote...

  2. Floodplain/wetland assessment of the effects of construction and operation ofa depleted uranium hexafluoride conversion facility at the Paducah, Kentucky,site.

    Energy Technology Data Exchange (ETDEWEB)

    Van Lonkhuyzen, R.

    2005-09-09

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF{sub 6}) Management Program evaluated alternatives for managing its inventory of DUF{sub 6} and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF{sub 6} PEIS) in April 1999 (DOE 1999). The DUF{sub 6} inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF{sub 6} PEIS, DOE stated its decision to promptly convert the DUF{sub 6} inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF{sub 6} conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF{sub 6} cylinders stored at ETTP to the Portsmouth site for conversion. This floodplain/wetland assessment has been prepared by DOE, pursuant to Executive Order 11988 (''Floodplain Management''), Executive Order 11990 (Protection of Wetlands), and DOE regulations for implementing these Executive Orders as set forth in Title 10, Part 1022, of the ''Code of Federal Regulations'' (10 CFR Part 1022 [''Compliance with Floodplain and Wetland Environmental Review Requirements'']), to evaluate potential impacts to floodplains and wetlands from the construction and operation of a conversion facility at the DOE Paducah site. Reconstruction of the bridge crossing Bayou Creek would occur within the Bayou Creek 100-year

  3. Prototype Environmental Assessment of the impacts of siting and construction of an SPS ground receiving station

    Science.gov (United States)

    Hill, J.

    1980-01-01

    A prototype assessment of the environmental impacts of siting and constructing a Satellite Power System (SPS) Ground Receiving Station (GRS) is reported. The objectives of the study were: (1) to develop an assessment of the nonmicrowave related impacts of the reference system SPS GRS on the natural environment; (2) to assess the impacts of GRS construction and operations in the context of actual baseline data for a site in the California desert; and (3) to identify critical GRS characteristics or parameters that are most significant in terms of the natural environment.

  4. Prospective safety performance evaluation on construction sites.

    Science.gov (United States)

    Wu, Xianguo; Liu, Qian; Zhang, Limao; Skibniewski, Miroslaw J; Wang, Yanhong

    2015-05-01

    This paper presents a systematic Structural Equation Modeling (SEM) based approach for Prospective Safety Performance Evaluation (PSPE) on construction sites, with causal relationships and interactions between enablers and the goals of PSPE taken into account. According to a sample of 450 valid questionnaire surveys from 30 Chinese construction enterprises, a SEM model with 26 items included for PSPE in the context of Chinese construction industry is established and then verified through the goodness-of-fit test. Three typical types of construction enterprises, namely the state-owned enterprise, private enterprise and Sino-foreign joint venture, are selected as samples to measure the level of safety performance given the enterprise scale, ownership and business strategy are different. Results provide a full understanding of safety performance practice in the construction industry, and indicate that the level of overall safety performance situation on working sites is rated at least a level of III (Fair) or above. This phenomenon can be explained that the construction industry has gradually matured with the norms, and construction enterprises should improve the level of safety performance as not to be eliminated from the government-led construction industry. The differences existing in the safety performance practice regarding different construction enterprise categories are compared and analyzed according to evaluation results. This research provides insights into cause-effect relationships among safety performance factors and goals, which, in turn, can facilitate the improvement of high safety performance in the construction industry. Copyright © 2015 Elsevier Ltd. All rights reserved.

  5. Status of the Texas low-level radioactive waste disposal site - construction sequencing and staffing patterns

    International Nuclear Information System (INIS)

    Jacobi, L.R. Jr.

    1996-01-01

    The Texas Low-Level Radioactive Waste Disposal Authority, an agency of the State of Texas, has been attempting to develop a site for the disposal of low-level radioactive waste in Texas for more than fourteen years. Since 1991, the agency has been evaluating a site near Sierra Blanca, in far west Texas. Site characterization was completed in 1992, and a license application was filed that year. Construction plans were completed in 1993. In April 1996, the licensing agency, the Texas Natural Resource Conservation Commission, completed its review and proposed to issue a license. The administrative hearings on the proposed license should be completed by July 1997. The Authority is prepared to begin construction and operations as soon as a final license can be issued

  6. Quality assurance during site construction

    International Nuclear Information System (INIS)

    Eymess, K.J.; Haas, R.; Wellnitz, G.

    1980-01-01

    Quality Assurance for Nuclear Power Plants under consideration of pipe assembling. Flow of Quality Requirements during: - Desing - Construction - Procurement - Prefabrication - Site. Organizational Requirements and Measurements during Erection: - Incoming Control - Material Storage - Surveillance of Tools - Weld Surveillance - Nondestructive Testing - Cleaning - Final Documentation. Qualification and Training of QA Personnel. (orig.)

  7. Environmental analysis of the operation of Oak Ridge National Laboratory (X-10 site)

    Energy Technology Data Exchange (ETDEWEB)

    Boyle, J.W.; Blumberg, R.; Cotter, S.J.

    1982-11-01

    An environmental analysis of the operation of the Oak Ridge National Laboratory (ORNL) facilities in Bethel Valley and Melton Valley was conducted to present to the public information concerning the extent to which recognizable effects, or potential effects, on the environment may occur. The analysis addresses current operations of the ORNL X-10 site and completed operations that may continue to have residual effects. Solid wastes from ORNL operations at the Y-12 site which are transported to the X-10 site for burial (e.g., Biology Division animal wastes) are included as part of X-10 site operation. Socioeconomic effects are associated primarily with the communities where employees live and with the Knoxville Bureau of Economic Analysis economic area as a whole. Therefore, ORNL employees at both Y-12 and X-10 sites are included in the ORNL socioeconomic impact analysis. An extensive base of environmental data was accumulated for this report. Over 80 reports related to ORNL facilities and/or operations are cited as well as many open-literature citations. Environmental effects of the operation of ORNL result from operational discharges from the onsite facilities; construction and/or modification of facilities, transportation to and from the site of persons, goods and services; socioeconomic impacts to the local, regional, and general population; and accidental discharges if they should occur. Operational discharges to the environnment are constrained by federal, state, and local regulations and by criteria established by the US Department of Energy to minimize adverse impacts. It is the purpose of this document to evaluate the operation of the ORNL insofar as impacts beyond the site boundary may occur or have the potential for occurrence.

  8. Environmental analysis of the operation of Oak Ridge National Laboratory (X-10 site)

    International Nuclear Information System (INIS)

    Boyle, J.W.; Blumberg, R.; Cotter, S.J.

    1982-11-01

    An environmental analysis of the operation of the Oak Ridge National Laboratory (ORNL) facilities in Bethel Valley and Melton Valley was conducted to present to the public information concerning the extent to which recognizable effects, or potential effects, on the environment may occur. The analysis addresses current operations of the ORNL X-10 site and completed operations that may continue to have residual effects. Solid wastes from ORNL operations at the Y-12 site which are transported to the X-10 site for burial (e.g., Biology Division animal wastes) are included as part of X-10 site operation. Socioeconomic effects are associated primarily with the communities where employees live and with the Knoxville Bureau of Economic Analysis economic area as a whole. Therefore, ORNL employees at both Y-12 and X-10 sites are included in the ORNL socioeconomic impact analysis. An extensive base of environmental data was accumulated for this report. Over 80 reports related to ORNL facilities and/or operations are cited as well as many open-literature citations. Environmental effects of the operation of ORNL result from operational discharges from the onsite facilities; construction and/or modification of facilities, transportation to and from the site of persons, goods and services; socioeconomic impacts to the local, regional, and general population; and accidental discharges if they should occur. Operational discharges to the environnment are constrained by federal, state, and local regulations and by criteria established by the US Department of Energy to minimize adverse impacts. It is the purpose of this document to evaluate the operation of the ORNL insofar as impacts beyond the site boundary may occur or have the potential for occurrence

  9. Construction of Nijenhuis operators and dendriform trialgebras

    Directory of Open Access Journals (Sweden)

    Philippe Leroux

    2004-01-01

    Full Text Available We construct Nijenhuis operators from particular bialgebras called dendriform-Nijenhuis bialgebras. It turns out that such Nijenhuis operators commute with TD-operators, a kind of Baxter-Rota operators, and are therefore closely related to dendriform trialgebras. This allows the construction of associative algebras, called dendriform-Nijenhuis algebras, made out of nine operations and presenting an exotic combinatorial property. We also show that the augmented free dendriform-Nijenhuis algebra and its commutative version have a structure of connected Hopf algebras. Examples are given.

  10. A novel methodology to estimate the evolution of construction waste in construction sites.

    Science.gov (United States)

    Katz, Amnon; Baum, Hadassa

    2011-02-01

    This paper focuses on the accumulation of construction waste generated throughout the erection of new residential buildings. A special methodology was developed in order to provide a model that will predict the flow of construction waste. The amount of waste and its constituents, produced on 10 relatively large construction sites (7000-32,000 m(2) of built area) was monitored periodically for a limited time. A model that predicts the accumulation of construction waste was developed based on these field observations. According to the model, waste accumulates in an exponential manner, i.e. smaller amounts are generated during the early stages of construction and increasing amounts are generated towards the end of the project. The total amount of waste from these sites was estimated at 0.2m(3) per 1m(2) floor area. A good correlation was found between the model predictions and actual data from the field survey. Copyright © 2010 Elsevier Ltd. All rights reserved.

  11. Construction Site Workers’ Awareness on Using Safety Equipment: Case Study

    OpenAIRE

    Ulang N. Md; Salim N. S.; Baharum F.; Agus Salim N.A.

    2014-01-01

    Construction sector is an important sector and contributed significantly to national development. However, this sector poses higher risk to accident. This is due to fact that construction site can be considered as a dangerous zone to workers and to the public. Due to the variety of cases occurs on site, the contractor will usually have to pay the cost related to accidents in the form of higher insurance premium. Despite various measures, accidents still occur at construction sites. Personal P...

  12. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 2, Sections 1-6

    Energy Technology Data Exchange (ETDEWEB)

    1991-04-01

    This (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains the analysis of programmatic alternatives, project alternatives, affected environment of alternative sites, environmental consequences, and environmental regulations and permit requirements.

  13. Design and implementation of an identification system in construction site safety for proactive accident prevention.

    Science.gov (United States)

    Yang, Huanjia; Chew, David A S; Wu, Weiwei; Zhou, Zhipeng; Li, Qiming

    2012-09-01

    Identifying accident precursors using real-time identity information has great potential to improve safety performance in construction industry, which is still suffering from day to day records of accident fatality and injury. Based on the requirements analysis for identifying precursor and the discussion of enabling technology solutions for acquiring and sharing real-time automatic identification information on construction site, this paper proposes an identification system design for proactive accident prevention to improve construction site safety. Firstly, a case study is conducted to analyze the automatic identification requirements for identifying accident precursors in construction site. Results show that it mainly consists of three aspects, namely access control, training and inspection information and operation authority. The system is then designed to fulfill these requirements based on ZigBee enabled wireless sensor network (WSN), radio frequency identification (RFID) technology and an integrated ZigBee RFID sensor network structure. At the same time, an information database is also designed and implemented, which includes 15 tables, 54 queries and several reports and forms. In the end, a demonstration system based on the proposed system design is developed as a proof of concept prototype. The contributions of this study include the requirement analysis and technical design of a real-time identity information tracking solution for proactive accident prevention on construction sites. The technical solution proposed in this paper has a significant importance in improving safety performance on construction sites. Moreover, this study can serve as a reference design for future system integrations where more functions, such as environment monitoring and location tracking, can be added. Copyright © 2011 Elsevier Ltd. All rights reserved.

  14. Construction and operation costs of constructed wetlands treating wastewater.

    Science.gov (United States)

    Gkika, Dimitra; Gikas, Georgios D; Tsihrintzis, Vassilios A

    2014-01-01

    Design data from nine constructed wetlands (CW) facilities of various capacities (population equivalent (PE)) are used to estimate construction and operation costs, and then to derive empirical equations relating the required facility land area and the construction cost to PE. In addition, comparisons between the costs of CW facilities based on various alternative construction materials, i.e., reinforced concrete and earth structures (covered with either high density polyethylene or clay), are presented in relation to the required area. The results show that earth structures are economically advantageous. The derived equations can be used for providing a preliminary cost estimate of CW facilities for domestic wastewater treatment.

  15. Enterprise risk management in international construction operations

    CERN Document Server

    Zhao, Xianbo; Low, Sui Pheng

    2015-01-01

    This book provides readers an understanding of the implementation of Enterprise Risk Management (ERM) for international construction operations. In an extended case study, it primarily focuses on Chinese construction firms (CCFs) based in Singapore. In this regard, the book explains the differences and similarities between Risk Management (RM), Project Risk Management (PRM) and ERM in the construction industry, and examines their linkages for international construction operations in a broader context. The explanation elaborates on how companies may adopt and implement RM, PRM and ERM as appropriate in their various operations, both in their home market as well as in overseas host markets. The book also reviews the whole spectrum of work relating to organizational behavior (OB) as one of the key underpinnings for companies to evaluate and implement ERM. It will benefit practitioners from the industry as well as academics interested in the implementation of ERM practices in international construction operat...

  16. Turbidity monitoring equipment and methodology evaluation at MDOT construction sites.

    Science.gov (United States)

    2014-12-01

    State Study 261 is a continuation of State study 225, "Turbidity Monitoring at Select : MDOT Construction Sites", which was successful in establishing baseline stream data : at several active construction sites. State Study 261 focused on the equipme...

  17. Greenhouse Gas Emissions from Excavation on Residential Construction Sites

    Directory of Open Access Journals (Sweden)

    Perry Forsythe

    2014-12-01

    Full Text Available Despite considerable research concerning the manifestation of greenhouse gases in the usage of buildings, little has been done concerning emissions arising from the construction process itself. This paper specifically examines emissions arising from cut and fill excavation on residential construction sites. Even though such excavation is often seen as being economical in terms of providing a flat base for concrete raft slab construction, the environmental consequences of this approach need to be considered more fully in terms of impact on the environment. This is particularly important when steeply sloping sites are involved and for different soil types. The paper undertakes a study that quantitatively assesses the cumulative greenhouse gas emissions caused by cut and fill excavation on 52 residential projects in Australia for a range of slope and soil types. The paper presents results from the study and concludes that greenhouse gas emissions increase as site slope increases; the building footprint area (as distinct from Gross Floor Area, exposes the need to reduce the area of the building to reduce greenhouse gas emissions; excavation of rock soils creates higher emissions than other soil types; and cut and fill excavation on steeply slope sites increase emissions. Potential alternative construction includes suspended floor construction systems which involve less excavation.

  18. Greenhouse Gas Emissions from Excavation on Residential Construction Sites

    Directory of Open Access Journals (Sweden)

    Perry Forsythe

    2014-12-01

    Full Text Available Despite considerable research concerning the manifestation of greenhouse gases in the usage of buildings, little has been done concerning emissions arising from the construction process itself. This paper specifically examines emissions arising from cut and fill excavation on residential construction sites. Even though such excavation is often seen as being economical in terms of providing a flat base for concrete raft slab construction, the environmental consequences of this approach need to be considered more fully in terms of impact on the environment. This is particularly important when steeply sloping sites are involved and for different soil types. The paper undertakes a study that quantitatively assesses the cumulative greenhouse gas emissions caused by cut and fill excavation on 52 residential projects in Australia for a range of slope and soil types. The paper presents results from the study and concludes that greenhouse gas emissions increase as site slope increases; the building footprint area (as distinct from Gross Floor Area, exposes the need to reduce the area of the building to reduce greenhouse gas emissions; excavation of rock soils creates higher emissions than other soil types; and cut and fill excavation on steeply slope sites increase emissions. Potential alternative construction includes suspended floor construction systems which involve less excavation. 

  19. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3070)

    Energy Technology Data Exchange (ETDEWEB)

    Zeitoun, A. [Science Applications International Corp., Germantown, MD (United States)

    1994-08-01

    This two-volume Final Environmental Impact Statement (FEIS) was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA). Volume 1 contains the assessment of the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana, by Louisiana Energy Services, LP. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are construction, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning (D&D)- of the site. Issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment. The FEIS supports issuance of a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility.

  20. Strategies for effective management of health and safety in confined site construction

    Directory of Open Access Journals (Sweden)

    John Spillane

    2013-12-01

    Full Text Available Purpose: The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. Design/Methodology/Approach: This is achieved by utilising individual interviews, focus groups discussion on selected case studies of confined construction sites, coupled with a questionnaire survey. Findings: The top five key strategies include (1 Employ safe system of work plans to mitigate personnel health and safety issues; (2 Inform personnel, before starting on-site, of the potential issues using site inductions; (3 Effective communication among site personnel; (4 Draft and implement an effective design site layout prior to starting on-site; and (5 Use of banksman (traffic co-ordinator to segregate personnel from vehicular traffic. Practical Implication: The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. Originality/Value: This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.

  1. Siting and constructing very deep monitoring wells on the US Department of Energy's Nevada Test Site

    International Nuclear Information System (INIS)

    Cullen, J.J.; Jacobson, R.L.; Russell, C.E.

    1991-01-01

    Many aspects of the Nevada Test Site's (NTS) hydrogeologic setting restrict the use of traditional methods for the siting and construction of ground-water characterization and monitoring wells. The size of the NTS precludes establishing high-density networks of characterization wells, as are typically used at smaller sites. The geologic complexity and variability of the NTS requires that the wells be criticality situated. The hydrogeologic complexity requires that each well provide access to many aquifers. Depths to ground water on the NTS require the construction of wells averaging approximately 1000 meters in depth. Wells meeting these criteria are uncommon in the ground-water industry, therefore techniques used by petroleum engineers are being employed to solve certain siting-, design- and installation-related problems. To date, one focus has been on developing completion strings that facilitate routine and efficient ground-water sampling from multiple intervals in a single well. The method currently advocated employs a new design of sliding side door sleeve that is actuated by an electrically operated hydraulic shifting tool. Stemming of the wells is being accomplished with standard materials (cement based grouts and sands); however, new stemming methods are being developed, to accommodate the greater depths, to minimize pH-related problems caused by the use of cements, to enhance the integrity of the inter-zone seals, and to improve the representativeness of radionuclide analyses performed on ground-water samples. Bench-scale experiments have been used to investigate the properties of more than a dozen epoxy-aggregate grout mixtures -- materials that are commonly used in underwater sealing applications

  2. Effects of organizational complexity and resources on construction site risk.

    Science.gov (United States)

    Forteza, Francisco J; Carretero-Gómez, Jose M; Sesé, Albert

    2017-09-01

    Our research is aimed at studying the relationship between risk level and organizational complexity and resources on constructions sites. Our general hypothesis is that site complexity increases risk, whereas more resources of the structure decrease risk. A Structural Equation Model (SEM) approach was adopted to validate our theoretical model. To develop our study, 957 building sites in Spain were visited and assessed in 2003-2009. All needed data were obtained using a specific tool developed by the authors to assess site risk, structure and resources (Construction Sites Risk Assessment Tool, or CONSRAT). This tool operationalizes the variables to fit our model, specifically, via a site risk index (SRI) and 10 organizational variables. Our random sample is composed largely of small building sites with general high levels of risk, moderate complexity, and low resources on site. The model obtained adequate fit, and results showed empirical evidence that the factors of complexity and resources can be considered predictors of site risk level. Consequently, these results can help companies, managers of construction and regulators to identify which organizational aspects should be improved to prevent risks on sites and consequently accidents. Copyright © 2017 National Safety Council and Elsevier Ltd. All rights reserved.

  3. Thermal calculations for the design, construction, operation, and evaluation of the Spent Fuel Test - Climax, Nevada Test Site

    International Nuclear Information System (INIS)

    Montan, D.N.; Patrick, W.C.

    1981-01-01

    The Spent Fuel Test-Climax (SFT-C) is a test of retrievable deep geologic storage of commercially generated spent nuclear reactor fuel in granitic rock. Eleven spent fuel assemblies, together with six electrical simulators and 20 guard heaters, are emplaced 420 m below the surface in the Climax granite at the US Department of Energy Nevada Test Site. On June 2, 1978 LLNL secured funding for the SFT-C, and completed spent fuel emplacement May 28, 1980. This report documents a series of thermal calculations that were performed in support of the SFT-C. Early calculations employed analytical solutions to address such design and construction issues as drift layout and emplacement hole spacings. Operational aspects of the test required more detailed numerical solutions dealing with ventilation and guard-heater power levels. The final set of calculations presented here provides temperature histories throughout the test facility for evaluation of the response of the SFT-C and for comparison of calculations with acquired data. This final set of calculations employs the as-built test geometry and best-available material properties

  4. Construal operations of the English progressive construction

    DEFF Research Database (Denmark)

    Jensen, Kim Ebensgaard

    2011-01-01

    present paper provides an overview of construal operations that are likely to be at play in the construction of the aspectual and actional meaning components of the progressive construction. The discussion also involves instances of the progressive construction, which display low semantic compatibility...

  5. Facility design, construction, and operation

    International Nuclear Information System (INIS)

    1995-04-01

    France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l'Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l'Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, including uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec's contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides' all of the basic information in these areas and reflects actual experience to date

  6. Meteorology in site operations

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    During the site selection and design phases of a plant, meteorological assistance must be based on past records, usually accumulated at stations not actually on the site. These preliminary atadvices will be averages and extremes that might be expected. After a location has been chosen and work has begun, current and forecast weather conditions become of immediate concern. On-site meteorological observations and forecasts have many applications to the operating program of an atomic energy site. Requirements may range from observations of the daily minimum temperatures to forecasts of radiation dosages from airborne clouds

  7. Mapping site-based construction workers’ motivation: Expectancy theory approach

    Directory of Open Access Journals (Sweden)

    Parviz Ghoddousi

    2014-03-01

    Full Text Available The aim of this study is to apply a recently proposed model of motivation based on expectancy theory to site-based workers in the construction context and confirm the validity of this model for the construction industry. The study drew upon data from 194 site-based construction workers in Iran to test the proposed model of motivation. To this end, the structural equation modelling (SEM approach based on the confirmatory factor analysis (CFA technique was deployed. The study reveals that the proposed model of expectancy theory incorporating five indicators (i.e. intrinsic instrumentality, extrinsic instrumentality, intrinsic valence, extrinsic valence and expectancy is able to map the process of construction workers’ motivation. Nonetheless, the findings posit that intrinsic indicators could be more effective than extrinsic ones. This proffers the necessity of construction managers placing further focus on intrinsic motivators to motivate workers. 

  8. Mapping site-based construction workers’ motivation: Expectancy theory approach

    Directory of Open Access Journals (Sweden)

    Parviz Ghoddousi

    2014-03-01

    Full Text Available The aim of this study is to apply a recently proposed model of motivation based on expectancy theory to site-based workers in the construction context and confirm the validity of this model for the construction industry. The study drew upon data from 194 site-based construction workers in Iran to test the proposed model of motivation. To this end, the structural equation modelling (SEM approach based on the confirmatory factor analysis (CFA technique was deployed. The study reveals that the proposed model of expectancy theory incorporating five indicators (i.e. intrinsic instrumentality, extrinsic instrumentality, intrinsic valence, extrinsic valence and expectancy is able to map the process of construction workers’ motivation. Nonetheless, the findings posit that intrinsic indicators could be more effective than extrinsic ones. This proffers the necessity of construction managers placing further focus on intrinsic motivators to motivate workers.

  9. Construction quality assurance closure report, Lawrence Livermore National Laboratory Site 300, Pits 1 and 7

    International Nuclear Information System (INIS)

    1993-02-01

    This document presents the Final Construction Quality Assurance (CQA) report for the closure cover system of two mixed, low-level radioactive and hazardous waste landfills (pits) at Site 300. Site 300, operated by the Lawrence Livermore National Laboratory (LLNL), is located in the Altamont Hills, approximately 15 miles southeast of Livermore, California. The purpose of this report is to document the CQA program established to assure that construction is completed in accordance with the design intent and the approved Closure and Post Closure Plans dated May 1989 and revised January 1990 (EPA ID Number: CA 2890090002). Inclusive within the Closure and Post Closure Plan were the CQA Plan and the Technical Specifications for the final cover system. This report contains a complete narrative with photographic documentation of the construction activities and progress, problems encountered and solutions utilized, and third party testing and monitoring results, thus establishing the verification of compliance with the Quality Assurance Plan for the project

  10. Design, construction and operation features of high-rise structures

    Science.gov (United States)

    Mylnik, Alexey; Mylnik, Vladimir; Zubeeva, Elena; Mukhamedzhanova, Olga

    2018-03-01

    The article considers design, construction and operation features of high-rise facilities. The analysis of various situations, that come from improper designing, construction and operation of unique facilities, is carried out. The integrated approach is suggested, when the problems of choosing acceptable constructional solutions related to the functional purpose, architectural solutions, methods of manufacturing and installation, operating conditions for unique buildings and structures are being tackled. A number of main causes for the emergency destruction of objects under construction and operation is considered. A number of measures are proposed on the basis of factor classification in order to efficiently prevent the situations, when various negative options of design loads and emergency impacts occur.

  11. Construction Site Workers’ Awareness on Using Safety Equipment: Case Study

    Directory of Open Access Journals (Sweden)

    Ulang N. Md

    2014-01-01

    Full Text Available Construction sector is an important sector and contributed significantly to national development. However, this sector poses higher risk to accident. This is due to fact that construction site can be considered as a dangerous zone to workers and to the public. Due to the variety of cases occurs on site, the contractor will usually have to pay the cost related to accidents in the form of higher insurance premium. Despite various measures, accidents still occur at construction sites. Personal Protective Equipment (PPE is one of the important means to protect the wearer from hazards in the workplace. Since this equipment is the last frontier of the wearer from worksite hazards, it is important to select it based on the job scope and the intended protection. Therefore, this study was formulated to find out the level of knowledge and awareness of construction workers on PPE usage. It was also important to know what make the workers would want or do not want to use the PPE. It was found in this study that the level of awareness and knowledge among workers on the proper use of PPE is moderate. Construction sites accident can be further be reduced with proper implementation of PPE voluntarily by all workers.

  12. Environmental Assessment for the construction and operation of the Three Rivers Solid Waste Authority regional waste management center at the Savannah River Site

    International Nuclear Information System (INIS)

    1995-12-01

    This Environmental Assessment (EA) has been prepared by the US Department of Energy (DOE) to assess the potential environmental impacts associated with the construction and operation of a landfill and technology center for regionally-generated municipal solid waste at the Savannah River Site (SRS) near Aiken, South Carolina. The facility would serve the municipal solid waste disposal needs for SRS and at least nine of the surrounding counties who currently comprise the Three Rivers Solid Waste Authority (TRSWA). Additional counties could become included in the proposed action at some future date. Current Federal and state requirements do not afford individual counties and municipalities within the region encompassing SRS the ability to efficiently or economically operate modern waste management facilities. In addition, consolidation of regional municipal solid waste at one location would have the benefit of reducing the duplicity of environmental consequences associated with the construction and operation of county-level facilities. The option to seek a combined disposal and technology development facility based on a regionally-cooperative effort was selected as a viable alternative to the existing individual SRS or county disposal activities. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended, the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Part 1021). NEPA requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described for impacts described herein, DOE will either publish a Finding of No Significant Impact or prepare an environmental impact statement (EIS)

  13. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  14. Construction plant requirements for nuclear sites

    International Nuclear Information System (INIS)

    Tatum, C.B.; Harris, J.A.

    1981-01-01

    Planning and developing the temporary construction plant facilities for a nuclear project is equivalent to providing utility services for a small city. Provision of adequate facilities is an important factor in the productivity of both the manual and non-manual work force. This paper summarizes construction facility requirements for a two unit (1300 MWe each) nuclear project. Civil, mechanical and electrical facilities are described, including design, installation and operation. Assignment of responsibility for specific work tasks regarding the construction plant is also discussed. In presenting this data, the authors seek to transfer experience and assist in the provision of adequate facilities on future projects

  15. Basic national requirements for safe design, construction and operation

    International Nuclear Information System (INIS)

    Franzen, L.F.

    1980-01-01

    Nuclear power plants have to be save. Vendors and utilities operating such plants, are convinced that their plants meet this requirement. Who, however, is establishing the safety requirements to be met by those manufacturing and operating nuclear power plants. What are the mechanisms to control whether the features provided assure the required safety level. Who controls whether the required and planned safety features are really provided. Who is eventually responsible for assuring safety after commissioning of a nuclear power plant. These fundamental questions being raised in many discussions on safety and environmental protection are dealt with in the following sections: (1) Fundamental safety requirements on nuclear power plants, in which such items as risk, legal bases and licensing procedure are discussed, (2) Surveillance during construction, in which safety analysis report, siting, safety evaluation, document examination, quality assurance, and commissioning testing are dealt with, (3) Operating tests and conditions in which recurrent inspections, environmental protection during operation, investigation of abnormal occurences and backfitting requirements as reviewed, and (4) Safety philosophy and safety policy to conclude this presentation. The German approach to nuclear safety serves as an example for an effective way of assuring safe nuclear power. (orig.)

  16. Authorization procedure for the construction and operation of nuclear installations within the EC Member States, including supervision and control

    International Nuclear Information System (INIS)

    Amaducci, Sandro; Didier, J.M.

    1978-01-01

    This report is an updating of the report EUR 5284, Authorization procedure for the construction and operation of nuclear installations within the EEC Member States, prepared in 1974 by J.M. Didier and Associates. Recent developments regarding the authorization procedure for the construction and operation of nuclear installations have taken place in Italy (introduction of a site approval procedure) and in Denmark (adoption of an overall legislation on the subject, however not yet in force). With respect to supervision and control of nuclear installations during construction and operation, competences of, as well as their exercise by, supervisory authorities in all EC Member States, with the exception of Ireland, are also analysed in the current study

  17. A physiological exploration on operational stance and occupational musculoskeletal problem manifestations amongst construction labourers of West Bengal, India.

    Science.gov (United States)

    Chatterjee, Arijit; Sahu, Subhashis

    2018-03-29

    A huge number of labourers engaged in construction industry in India both in organized and unorganized sectors. The construction labourers most often work for an extended period of time and they are compelled to uphold altered static and dynamic operational stance in awkward positions during the complete period of work which raises the demand on the musculoskeletal system and may lead to work related musculoskeletal disorders (WRMSDs). This study is intended to explore the operational stance and occupation related musculoskeletal manifestations amongst the construction labourers. One sixty four male labourers from different construction sites of West Bengal was randomly taken for this study. A modified Nordic questionnaire on MSD and the 12 item General Health Questionnaire (GHQ12) were administered on the construction labourers. Rapid Entire Body Assessment [REBA] and Ovako Work Analysis System [OWAS] methods were applied to analyze the operational stance. Finally, discomfort levels of the specific operational stance were calculated by the use of risk level and BPD scale. From the study it was revealed that most of the construction labourers habitually in awkward operational stance and were affected by altering musculoskeletal manifestations like pain in low back, neck, and wrist. It has been also found that there is a significant (pconstruction labourers in unorganized sectors.

  18. Occupational health and safety in the Moroccan construction sites: preliminary diagnosis

    Science.gov (United States)

    Tarik, Bakeli; Adil, Hafidi Alaoui

    2018-05-01

    Managing occupational health and safety on Moroccan construction sector represents the first step for projects' success. In fact, by avoiding accidents, all the related direct and indirect costs and delays can be prevented. That leads to an important question always asked by any project manager: what are the factors responsible for accidents? How can they be avoided? Through this research, the aim is to go through these questions, to contribute in occupational health and safety principles understanding, to identify construction accidentology and risk management opportunities and to approach the case of Moroccan construction sites by an accurate diagnosis. The approach is to make researchers, managers, stakeholders and deciders aware about the criticality of construction sites health and safety situation. And, to do the first step for a scientific research project in relation with health and safety in the Moroccan construction sector. For this, the paper will study the related state of art namely about construction sites accidents causation, and will focus on Reason's `Swiss cheese' model and its utilization for Moroccan construction sites health and safety diagnosis. The research will end with an estimation of an accidents fatality rate in the Moroccan construction sector and a benchmarking with the international rates. Finally, conclusions will be presented about the necessity of Occupational Health and Safety Management System (OHSMS) implementation, which shall cover all risk levels, and insure, at the same time, that the necessary defenses against accidents are on place.

  19. Causes of Fall Hazards in Construction Site Management

    OpenAIRE

    Liy, Chong Hui; Ibrahim, Siti Halipah; Affandi, Rohaida; Rosli, Nor Azalina; Nawi, Mohd Nasrun Mohd

    2016-01-01

    Statistics from Occupational Safety and Health Act 1994 has shown that the number of fatality in the construction industry is 5 times more than in other sectors. The total fatalities in construction are 796 in year 2013 and out of this 796, there were 294 fall fatalities. Hence, there is an urgent need to mitigate this problem. A study has been conducted to investigate the root causes of fall hazards in construction site. Therefore, this paper is intended to identify and highlights the types ...

  20. 30 CFR 285.620 - What is a Construction and Operations Plan (COP)?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Construction and Operations Plan (COP... Information Requirements Construction and Operations Plan for Commercial Leases § 285.620 What is a Construction and Operations Plan (COP)? The COP describes your construction, operations, and conceptual...

  1. Experience from construction and operation of Karachi nuclear power plant

    International Nuclear Information System (INIS)

    Zaidi, S.M.N.

    1977-01-01

    Pakistan's first nuclear power plant (KANUPP) is owned and operated by the Pakistan Atomic Energy Commission (PAEC). It uses a heavy water moderated and cooled natural uranium fuelled reactor. Total installed capacity is 137 MW(e). It was designed, constructed and commissioned by Canadian General Electric Co. Ltd. (CGE) as Prime Contractor. Construction started in mid-1966 and was completed in mid 1970; commissioning started in early 1970 and was completed at the end of 1972. Intensive on-the-job training for 20 engineers and 15 operators was provided by CGE in Canada. Ten engineers also worked in CGE's design offices. With this key group of engineers and technicians PAEC had no difficulty in taking over the plant from CGE after completion. The construction of the plant in a developing country presented special problems to CGE. The relatively small local construction firms had limited experience and equipment. Construction plant, equipment and tools were scarce. Fabrication and workshop facilities of limited scope were available but their quotations were relatively high. A scarcity of engineering, technical and skilled manpower for the construction of the project left as the only alternative on-site training for carefully recruited technicians. The results were most gratifying and compared favourably with CGE's Canadian experience. Welding, pipe fitting, tubing work and electrical connections were excellent. The local staff's productivity and dedication were very good. In the commissioning period, PAEC and CGE engineers and technicians worked as one team, testing and debugging the equipment and systems and demonstrating the contractual performance warranties. This period extended to approximately three years due to many technical problems resulting from equipment failures, environmental problems, system problems, plant loading limitations in view of the relatively small size of the grid system and special requirement of fuel conditioning to avoid premature fuel

  2. Shaft Siting and Configuration for Flexible Operating Mode

    International Nuclear Information System (INIS)

    Robert Boutin

    2001-01-01

    The purpose of this document as stated in the ''Technical Work Plan for Subsurface Design Section FY 01 Work Activities'' (CRWMS M and O 2001a, pg. 14) is to review and evaluate the most current concepts for shaft siting and configuration. The locations of the shaft sites will be evaluated in reference to the overall subsurface ventilation layout shown in Figure 1. The scope will include discussions on pad size requirements, shaft construction components such as collars, shaft stations, sumps, ground support and linings, head frames, fan ducting and facility equipping. In addition to these, shaft excavation methodologies and integration with the overall subsurface construction schedule will be described. The Technical Work Plan (TWP), (CRWMS M and O 2001a), for this document has been prepared in accordance with AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering and Regulatory Compliance Activities''. This document will be prepared in accordance with AP-3.10Q, ''Analysis and Models''. This document contributes to Site Recommendation (SR). The intended use of this document is to provide an analysis for shaft siting and configuration criteria for subsequent construction. This document identifies preliminary design concepts that should not be used for procurement, fabrication, or construction

  3. A Continuing Education Short Course and Engineering Curriculum to Accelerate Workforce Development in Wind Power Plant Design, Construction, and Operations

    Energy Technology Data Exchange (ETDEWEB)

    Tinjum, James [Univ. of Wisconsin, Madison, WI (United States)

    2012-11-29

    Significant advances in wind turbine technology and wind turbine power plant capabilities are appearing in the U.S. Sites that only 10 years ago might have been overlooked are being considered for build out. However, the development of a skilled workforce in the engineering fields and construction trades lags the potential market, especially if the industry is expected to site, design, construct, and operate sufficient wind power plant sites to meet the potential for 20% wind energy by 2030. A select few firms have penetrated the engineer-procure-construction (EPC) market of wind power plant construction. Competition and know-how in this market is vital to achieve cost-effective, design-construct solutions. The industry must produce or retrain engineers, contractors, and technicians to meet ambitious goals. Currently, few universities offer undergraduate or graduate classes that teach the basics in designing, building, and maintaining wind power plants that are safe, efficient, and productive.

  4. Quality assurance during site construction. Pt. 1

    International Nuclear Information System (INIS)

    Mueller, J.

    1980-01-01

    The first part of the lecture deals with the Quality Assurance system on the construction site in general. Basic site-related problems during contract implementation and the QA system requirements resulting from them are presented. The compilation of these requirements in a QA program and its inclusion in the site manual in written form are explained. Site organization, personnel qualification and procedures are referred to. Whereas the first part shows what is to be done, the second part shows how it can be put into practice on the site. All the essential points for the assurance of quality are addressed. They include, e.g., review of documents, incoming goods control, in-process surveillance, store controls, identification of components and systems, dealing with changes and deviations, documentation control and audits. By means of examples taken form practice the necessity of a well-functioning QA system, and the importance of quality-assuring measures on the site are pointed out. (orig.)

  5. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  6. Hanford Site air operating permit application

    International Nuclear Information System (INIS)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ''regulated'' pollutants. Regulated pollutants include ''criteria'' pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ''Hazardous'' Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995

  7. Nucleic acid constructs containing orthogonal site selective recombinases (OSSRs)

    Energy Technology Data Exchange (ETDEWEB)

    Gilmore, Joshua M.; Anderson, J. Christopher; Dueber, John E.

    2017-08-29

    The present invention provides for a recombinant nucleic acid comprising a nucleotide sequence comprising a plurality of constructs, wherein each construct independently comprises a nucleotide sequence of interest flanked by a pair of recombinase recognition sequences. Each pair of recombinase recognition sequences is recognized by a distinct recombinase. Optionally, each construct can, independently, further comprise one or more genes encoding a recombinase capable of recognizing the pair of recombinase recognition sequences of the construct. The recombinase can be an orthogonal (non-cross reacting), site-selective recombinase (OSSR).

  8. Improving construction site safety through leader-based verbal safety communication.

    Science.gov (United States)

    Kines, Pete; Andersen, Lars P S; Spangenberg, Soren; Mikkelsen, Kim L; Dyreborg, Johnny; Zohar, Dov

    2010-10-01

    The construction industry is one of the most injury-prone industries, in which production is usually prioritized over safety in daily on-site communication. Workers have an informal and oral culture of risk, in which safety is rarely openly expressed. This paper tests the effect of increasing leader-based on-site verbal safety communication on the level of safety and safety climate at construction sites. A pre-post intervention-control design with five construction work gangs is carried out. Foremen in two intervention groups are coached and given bi-weekly feedback about their daily verbal safety communications with their workers. Foremen-worker verbal safety exchanges (experience sampling method, n=1,693 interviews), construction site safety level (correct vs. incorrect, n=22,077 single observations), and safety climate (seven dimensions, n=105 questionnaires) are measured over a period of up to 42 weeks. Baseline measurements in the two intervention and three control groups reveal that foremen speak with their workers several times a day. Workers perceive safety as part of their verbal communication with their foremen in only 6-16% of exchanges, and the levels of safety at the sites range from 70-87% (correct observations). Measurements from baseline to follow-up in the two intervention groups reveal that safety communication between foremen and workers increases significantly in one of the groups (factor 7.1 increase), and a significant yet smaller increase is found when the two intervention groups are combined (factor 4.6). Significant increases in the level of safety are seen in both intervention groups (7% and 12% increases, respectively), particularly in regards to 'access ways' and 'railings and coverings' (39% and 84% increases, respectively). Increases in safety climate are seen in only one of the intervention groups with respect to their 'attention to safety.' No significant trend changes are seen in the three control groups on any of the three measures

  9. Application for Permit to Operate a Class II Solid Waste Disposal Site at the Nevada Test Site - U10c Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Programs

    2010-03-31

    The Nevada Test Site (NTS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NTS and National Security Technologies LLC (NSTec) is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The site will be used for the disposal of refuse, rubbish, garbage, sewage sludge, pathological waste, Asbestos-Containing Material (ACM), industrial solid waste, hydrocarbon-burdened soil, hydrocarbon-burdened demolition and construction waste, and other inert waste (hereafter called permissible waste). Waste containing free liquids or regulated under Subtitle C of the Resource Conservation and Recovery Act (RCRA) will not be accepted for disposal at the site. Waste regulated under the Toxic Substance Control Act (TSCA), excluding Polychlorinated Biphenyl [PCB], Bulk Product Waste (see Section 6.2.5) and ACM (see Section 6.2.2.2) will not be accepted for disposal at the site. The disposal site will be used as the sole depository of permissible waste which is: (1) Generated by entities covered under the U.S. Environmental Protection Agency (EPA) Hazardous Waste Generator Identification Number for the NTS; (2) Generated at sites identified in the Federal Facilities Agreement and Consent Order (FFACO); (3) Sensitive records and media, including documents, vugraphs, computer disks, typewriter ribbons, magnetic tapes, etc., generated by NNSA/NSO or its contractors; (4) ACM generated by NNSA/NSO or its contractors according to Section 6.2.2.2, as necessary; (5) Hydrocarbon-burdened soil and solid waste from areas covered under the EPA Hazardous Waste Generator Identification Number for the NTS; (6) Other waste on a case-by-case concurrence by

  10. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO

    Science.gov (United States)

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  11. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sustainable principles for siting, design and construction. [Reserved] 435.6 Section 435.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS...-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  12. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sustainable principles for siting, design and construction. [Reserved] 433.6 Section 433.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS... BUILDINGS § 433.6 Sustainable principles for siting, design and construction. [Reserved] ...

  13. Submicron particle monitoring of paving and related road construction operations.

    Science.gov (United States)

    Freund, Alice; Zuckerman, Norman; Baum, Lisa; Milek, Debra

    2012-01-01

    This study identified activities and sources that contribute to ultrafine and other submicron particle exposure that could trigger respiratory symptoms in highway repair workers. Submicron particle monitoring was conducted for paving, milling, and pothole repair operations in a major metropolitan area where several highway repair workers were identified as symptomatic for respiratory illness following exposures at the 2001 World Trade Center disaster site. Exposure assessments were conducted for eight trades involved in road construction using a TSI P-Trak portable condensation particle counter. Direct readings near the workers' breathing zones and observations of activities and potential sources were logged on 7 days on 27 workers using four different models of pavers and two types of millers. Average worker exposure levels ranged from 2 to 3 times background during paving and from 1 to 4 times background during milling. During asphalt paving, average personal exposures to submicron particulates were 25,000-60,000, 28,000-70,000, and 23,000-37,000 particles/ cm(3) for paver operators, screed operators, and rakers, respectively. Average personal exposures during milling were 19,000-111,000, 28,000-81,000, and 19,000 particles/cm(3) for the large miller operators, miller screed operators, and raker, respectively. Personal peak exposures were measured up to 467,000 and 455,000 particles/cm(3) in paving and milling, respectively. Several sources of submicron particles were identified. These included the diesel and electric fired screed heaters; engine exhaust from diesel powered construction vehicles passing by or idling; raking, dumping, and paving of asphalt; exhaust from the hotbox heater; pavement dust or fumes from milling operations, especially when the large miller started and stopped; and secondhand cigarette smoke. To reduce the potential for health effects in workers, over 40 recommendations were made to control exposures, including improved maintenance of

  14. Evaluation of Acquisition Strategies for Image-Based Construction Site Monitoring

    Science.gov (United States)

    Tuttas, S.; Braun, A.; Borrmann, A.; Stilla, U.

    2016-06-01

    Construction site monitoring is an essential task for keeping track of the ongoing construction work and providing up-to-date information for a Building Information Model (BIM). The BIM contains the as-planned states (geometry, schedule, costs, ...) of a construction project. For updating, the as-built state has to be acquired repeatedly and compared to the as-planned state. In the approach presented here, a 3D representation of the as-built state is calculated from photogrammetric images using multi-view stereo reconstruction. On construction sites one has to cope with several difficulties like security aspects, limited accessibility, occlusions or construction activity. Different acquisition strategies and techniques, namely (i) terrestrial acquisition with a hand-held camera, (ii) aerial acquisition using a Unmanned Aerial Vehicle (UAV) and (iii) acquisition using a fixed stereo camera pair at the boom of the crane, are tested on three test sites. They are assessed considering the special needs for the monitoring tasks and limitations on construction sites. The three scenarios are evaluated based on the ability of automation, the required effort for acquisition, the necessary equipment and its maintaining, disturbance of the construction works, and on the accuracy and completeness of the resulting point clouds. Based on the experiences during the test cases the following conclusions can be drawn: Terrestrial acquisition has the lowest requirements on the device setup but lacks on automation and coverage. The crane camera shows the lowest flexibility but the highest grade of automation. The UAV approach can provide the best coverage by combining nadir and oblique views, but can be limited by obstacles and security aspects. The accuracy of the point clouds is evaluated based on plane fitting of selected building parts. The RMS errors of the fitted parts range from 1 to a few cm for the UAV and the hand-held scenario. First results show that the crane camera

  15. EVALUATION OF ACQUISITION STRATEGIES FOR IMAGE-BASED CONSTRUCTION SITE MONITORING

    Directory of Open Access Journals (Sweden)

    S. Tuttas

    2016-06-01

    Full Text Available Construction site monitoring is an essential task for keeping track of the ongoing construction work and providing up-to-date information for a Building Information Model (BIM. The BIM contains the as-planned states (geometry, schedule, costs, ... of a construction project. For updating, the as-built state has to be acquired repeatedly and compared to the as-planned state. In the approach presented here, a 3D representation of the as-built state is calculated from photogrammetric images using multi-view stereo reconstruction. On construction sites one has to cope with several difficulties like security aspects, limited accessibility, occlusions or construction activity. Different acquisition strategies and techniques, namely (i terrestrial acquisition with a hand-held camera, (ii aerial acquisition using a Unmanned Aerial Vehicle (UAV and (iii acquisition using a fixed stereo camera pair at the boom of the crane, are tested on three test sites. They are assessed considering the special needs for the monitoring tasks and limitations on construction sites. The three scenarios are evaluated based on the ability of automation, the required effort for acquisition, the necessary equipment and its maintaining, disturbance of the construction works, and on the accuracy and completeness of the resulting point clouds. Based on the experiences during the test cases the following conclusions can be drawn: Terrestrial acquisition has the lowest requirements on the device setup but lacks on automation and coverage. The crane camera shows the lowest flexibility but the highest grade of automation. The UAV approach can provide the best coverage by combining nadir and oblique views, but can be limited by obstacles and security aspects. The accuracy of the point clouds is evaluated based on plane fitting of selected building parts. The RMS errors of the fitted parts range from 1 to a few cm for the UAV and the hand-held scenario. First results show that the crane

  16. Study of relationship between time overrun and productivity on construction sites

    Directory of Open Access Journals (Sweden)

    Ameh, Oko John

    2011-12-01

    Full Text Available The history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns. In an attempt to reverse this trend, this study aims at establishing the relationship between time overrun and labour productivity on construction sites in Lagos, Nigeria. 43 technical and management staff of some medium and large construction firms based in Lagos, Nigeria were sampled and administered a questionnaire survey. The questionnaire contained 18 causes of project time overrun and 14 causes of low labour productivity which had been identified from the literature reviewed. With these a relationship between project time overrun and low labour productivity was established. Both descriptive and inferential statistics were used in analyzing the data. Results indicate that inadequate funds for the project, inadequate planning before project takeoff, inadequate tools and equipment and delay in delivery of material top the list of major causes of time overrun while the use of wrong construction methods, inadequate construction materials and inaccurate drawing/specification are the key factors causing low labour productivity on construction sites. Significant negative relationship was found between time overrun and labour productivity in construction sites in Nigeria. The study concludes by recommending that early appointment of project managers could ensure proper management of both the human and material resources that could guarantee improved productivity and ultimately save projects from time overrun.

  17. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 3, Sections 7-12, Appendices A-C

    Energy Technology Data Exchange (ETDEWEB)

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains references; a list of preparers and recipients; acronyms, abbreviations, and units of measure; a glossary; an index and three appendices.

  18. Berlin Brandenburg International (BER: planning and implementation of a concrete supply chain for the airport construction site

    Directory of Open Access Journals (Sweden)

    Guido Riedel

    2012-12-01

    planning permission for the airport. Conclusions: Every logistical supply chain has its own individual requirements and constraints. This approach shows how a centralized supply chain could be installed that meets all the individual constraints of this construction site. The key components of the concept are the on-site concrete plant, the delivery of raw materi al by train, a centralized quality assurance and a specific contract structure with the operator of the concrete plant.  

  19. Hazardous waste operational plan for site 300

    International Nuclear Information System (INIS)

    Roberts, R.S.

    1982-01-01

    This plan outlines the procedures and operations used at LLNL's Site 300 for the management of the hazardous waste generated. This waste consists primarily of depleted uranium (a by-product of U-235 enrichment), beryllium, small quantities of analytical chemicals, industrial type waste such as solvents, cleaning acids, photographic chemicals, etc., and explosives. This plan details the operations generating this waste, the proper handling of this material and the procedures used to treat or dispose of the hazardous waste. A considerable amount of information found in this plan was extracted from the Site 300 Safety and Operational Manual written by Site 300 Facility personnel and the Hazards Control Department

  20. Design concepts for an integrated control room used as a site-wide operations facility

    International Nuclear Information System (INIS)

    Simon, B.H.; Raghavan, R.; Ujita, H.; Utena, S.; Sakuma, A.; Itoh, T.; Fukura, M.; Ono, I.

    1995-01-01

    The concept of an Integrated Main Control Room (IMCR) evolved from surveys conducted by Tokyo Electric Power Company (TEPCO) with plant managers and workers as their existing GE-type boiling water reactors (BWRs) on the need for improved operating conditions in a new generation of reactors being developed for the next century (around 2010). These reactors will be a further enhancement of the advanced boiling water reactors (ABWRs) now being constructed at the Kashiwazaki-Kariwa site in Japan (no.6 and no.7). TEPCO also saw a need for new thinking on control room design because of projected social conditions in Japan for the 21st century. These projections forecast a smaller number of skilled engineering graduates and those graduates less willing to work in nuclear power because such work is seen as unappealing, conducted in remote geographical locations, and requiring extensive night duty. As one solution to reducing operator burden and decreasing the night shift staff, while making nuclear plant operation more interesting for the operators and reducing labor and construction costs, the IMCR was conceived. (author)

  1. Horizon Dam design, construction, and quality management

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, B. [EBA Engineering Consultants Ltd., Nanaimo, BC (Canada); Sisson, R. [Canadian Natural Resources Ltd., Fort McMurray, AB (Canada)

    2010-07-01

    This paper discussed the design and construction of the Tar River Diversion Dam and the quality management system (QMS) used during construction. The project was unusual in that the company constructed the project using its own workforce, without contractors, under challenging schedule and site conditions. The topography, geology and geotechnical aspects of the site were discussed along with the embankment design, seepage control measures and construction execution. The QMS was designed to fit the needs of the unique construction execution strategy and meet safety, reliability, performance, and operation requirements, comply with all regulations and approval conditions, and identify and communicate risk to the appropriate entity. Specifications and construction procedures had to be modified to accommodate equipment operators trained with the skills and techniques of mine operations, not those associated with conventional civil construction projects. Foundation movement identified during construction required mid-build design changes, construction rescheduling, and additional deformation analyses to determine long-term stability. The QMS allowed changes in the understanding of site conditions to be quickly addressed and risks to be identified and cost-effectively mitigated. Design consultants were used to modify designs and appropriately identify and mitigate risks. The approach to embankment construction was successful because the QMS included processes for change management, issue resolution, and risk-benefit assessment, and because experienced personnel had a regular presence on the construction site and worked collaboratively. The effective QMS was deemed to be integral to the success of the construction project. 1 tab., 7 figs.

  2. Law no. 10.308 of 20th November, 2001 on radioactive waste repositories siting, construction, licensing, operation, inspection, costs, indemnity, civil liability and guarantees concerning to the radioactive wastes repositories and other provisions

    International Nuclear Information System (INIS)

    2001-01-01

    This Act was published on November 20, 2001 and set forth regulations on the final disposal of radioactive wastes produced in Brazil, including siting, construction, licensing, operation, inspection, costs, indemnities, civil liability and guarantees concerning to the radioactive wastes repositories. This act allows for installation and operation of initial, intermediary and final repositories in accordance with the criteria established by the Brazilian Nuclear Energy National Commission - CNEN. The person or organization granted with CNEN authorization for operation of the initial repositories shall be liable for personal, patrimony and environmental radiological damages. The civil liability of CNEN is concerned to the radioactive waste intermediary and final disposals and transportation

  3. Advances and Challenges in the Implementation of DiD in Siting, Design, and Construction of Nuclear Installations in Vietnam

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, H.A., E-mail: nhanh@varans.vn [Vietnam Agency for Radiation and Nuclear Safety, Hanoi (Viet Nam)

    2014-10-15

    Vietnam is embarking on a development of a nuclear power program. The main focus is now on the initial 1000 MWe x 2 units of the nuclear power plant in Ninh Thuan province. Now, the nuclear projects of Vietnam are in the phase of siting approval and investment projects approval. The design assessment will be performed in 2013-2014; the construction and installation will be performed from now until the operating licensing is obtained in 2020-2021. With state of development of a nuclear power program in Vietnam, this paper only focuses on advances and challenges in the implementation of Defence in Depth (DID) in siting, design, and construction of nuclear installations in Vietnam. (author)

  4. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO - (Presentation)

    Science.gov (United States)

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  5. Operational experience with CMS Tier-2 sites

    International Nuclear Information System (INIS)

    Gonzalez Caballero, I

    2010-01-01

    In the CMS computing model, more than one third of the computing resources are located at Tier-2 sites, which are distributed across the countries in the collaboration. These sites are the primary platform for user analyses; they host datasets that are created at Tier-1 sites, and users from all CMS institutes submit analysis jobs that run on those data through grid interfaces. They are also the primary resource for the production of large simulation samples for general use in the experiment. As a result, Tier-2 sites have an interesting mix of organized experiment-controlled activities and chaotic user-controlled activities. CMS currently operates about 40 Tier-2 sites in 22 countries, making the sites a far-flung computational and social network. We describe our operational experience with the sites, touching on our achievements, the lessons learned, and the challenges for the future.

  6. How to Commission, Operate and Maintain a Large Future Accelerator Complex From Far Remote Sites

    International Nuclear Information System (INIS)

    Phinney, Nan

    2001-01-01

    A study on future large accelerators [1] has considered a facility, which is designed, built and operated by a worldwide collaboration of equal partner institutions, and which is remote from most of these institutions. The full range of operation was considered including commissioning, machine development, maintenance, trouble shooting and repair. Experience from existing accelerators confirms that most of these activities are already performed remotely. The large high-energy physics experiments and astronomy projects, already involve international collaborations of distant institutions. Based on this experience, the prospects for a machine operated remotely from far sites are encouraging. Experts from each laboratory would remain at their home institution but continue to participate in the operation of the machine after construction. Experts are required to be on site only during initial commissioning and for particularly difficult problems. Repairs require an on-site non-expert maintenance crew. Most of the interventions can be made without an expert and many of the rest resolved with remote assistance. There appears to be no technical obstacle to controlling an accelerator from a distance. The major challenge is to solve the complex management and communication problems

  7. How to Commission, Operate and Maintain a Large Future Accelerator Complex From Far Remote Sites

    Energy Technology Data Exchange (ETDEWEB)

    Phinney, Nan

    2001-12-07

    A study on future large accelerators [1] has considered a facility, which is designed, built and operated by a worldwide collaboration of equal partner institutions, and which is remote from most of these institutions. The full range of operation was considered including commissioning, machine development, maintenance, troubleshooting and repair. Experience from existing accelerators confirms that most of these activities are already performed 'remotely'. The large high-energy physics experiments and astronomy projects, already involve international collaborations of distant institutions. Based on this experience, the prospects for a machine operated remotely from far sites are encouraging. Experts from each laboratory would remain at their home institution but continue to participate in the operation of the machine after construction. Experts are required to be on site only during initial commissioning and for particularly difficult problems. Repairs require an on-site non-expert maintenance crew. Most of the interventions can be made without an expert and many of the rest resolved with remote assistance. There appears to be no technical obstacle to controlling an accelerator from a distance. The major challenge is to solve the complex management and communication problems.

  8. Construction of Basic Evaluation Criteria for Candidate HLW Repository Sites (1)

    International Nuclear Information System (INIS)

    Koh, Yong Kwon; Bae, Dae Seok; Kim, Kyung Su; Kim, Geon Young; Park, Kyung Woo; Ji, Sung Hoon; Ryu, Ji Hun

    2009-08-01

    We constructed the preliminary site assessment system for selection of proper site as high level radioactive disposal repository with consideration of Korean geological characteristics and underground environments. And, site assessment factor and standard as a point of geologic aspect were suggested for decision of candidate radioactive disposal site in Korea. The results can be used to develop the geological information system for assessment of candidate disposal site

  9. Developing a system dynamics model to analyse environmental problem in construction site

    Science.gov (United States)

    Haron, Fatin Fasehah; Hawari, Nurul Nazihah

    2017-11-01

    This study aims to develop a system dynamics model at a construction site to analyse the impact of environmental problem. Construction sites may cause damages to the environment, and interference in the daily lives of residents. A proper environmental management system must be used to reduce pollution, enhance bio-diversity, conserve water, respect people and their local environment, measure performance and set targets for the environment and sustainability. This study investigates the damaging impact normally occur during the construction stage. Environmental problem will cause costly mistake in project implementation, either because of the environmental damages that are likely to arise during project implementation, or because of modification that may be required subsequently in order to make the action environmentally acceptable. Thus, findings from this study has helped in significantly reducing the damaging impact towards environment, and improve the environmental management system performance at construction site.

  10. Unit soil loss rate from various construction sites during a storm.

    Science.gov (United States)

    Maniquiz, Marla C; Lee, Soyoung; Lee, Eunju; Kong, Dong-Soo; Kim, Lee-Hyung

    2009-01-01

    The Korean Ministry of Environment (MOE) opts to establish an ordinance having a standard specifying an allowable soil loss rate applicable to construction projects. The predicted amount of soil loss from a construction site exceeding the standard can be used to calculate the percent reduction necessary to comply with the ordinance. This research was conducted to provide a basis to establish a standard by investigating the unit soil loss rates in the three phases of development: pre-construction, active construction and post construction based from 1,036 Environmental Impact Assessment (EIA) reports within the six-year period (2000-2005). Based on the findings, several factors affect the magnitude of soil loss rates particularly storm characteristics, site slope, soil type, location from rivers, as well as the type of construction activity. In general, the unit soil loss rates during the active construction phase are extremely higher in comparison to undisturbed areas; in magnitude of 7 to 80 times larger in urban areas and 18 to 585 times in rural areas. Only between 20 to 40 percent of the soil loss rates was contributed at pre- and post- construction phases indicating that the active construction phase is the most important phase to control.

  11. Final environmental impact statement, construction and operation of the Spallation Neutron Source Facility. Summary

    International Nuclear Information System (INIS)

    1999-04-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed, spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation Neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulator ring and a second target. This document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this FEIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. The No-Action Alternative describes the expected condition of the environment if no action were taken. Four siting alternatives for the Spallation Neutron Source are evaluated: Oak Ridge National Laboratory, Oak Ridge, TN, (preferred alternative); Argonne National Laboratory, Argonne, IL; Brookhaven National Laboratory, Upton, NY; and Los Alamos National Laboratory, Los Alamos, NM

  12. Final environmental impact statement, construction and operation of the Spallation Neutron Source. Volume 1

    International Nuclear Information System (INIS)

    1999-04-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed, spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulator ring and a second target. This document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this FEIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. The No-Action Alternative describes the expected condition of the environment if no action were taken. Four siting alternatives for the Spallation Neutron Source are evaluated: Oak Ridge National Laboratory, Oak Ridge, TN, (preferred alternative); Argonne National Laboratory, Argonne, IL; Brookhaven National Laboratory, Upton, NY; and Los Alamos National Laboratory, Los Alamos, NM

  13. Construction quality assurance for Pit 6 landfill closure, Lawrence Livermore National Laboratory, Site 300

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-30

    Golder Construction Services, Inc. (GCS), under contract to the Regents of the University of California, Lawrence Livermore National Laboratory (LLNL), provided the construction quality assurance (CQA) observation and testing during the construction of the Site 300, Pit 6 landfill closure cover. The cap construction was performed as a CERCLA non-time-critical removal action from June 2 to August 29, 1997. the project site is located 18 miles east of Livermore on Tesla Road and approximately 10 miles southwest of Tracy on Corral Hollow Road in San Joaquin County, California. This report certifies that the LLNL, Site 300, Pit 6, Landfill Closure was constructed in accordance with the construction specifications and design drawings. This report documents construction activities and CQA monitoring and testing for construction of the Pit 6 Landfill Closure. Golder Associates, Inc. of Oakland, California was the design engineering firm responsible for preparation of the drawings and specifications. CQA services were provided by GCS, of Roseville, California, under supervision of a California registered civil Engineer.

  14. Construction and operation of the Howard T. Ricketts Laboratory.

    Energy Technology Data Exchange (ETDEWEB)

    Van Lonkhuyzen, R.; Stull, L.; Butler, J.; Chang, Y.; Allison, T.; O' Rourke, D.

    2006-01-01

    The National Institutes of Health (NIH) has proposed to partially fund the construction of the Howard T. Ricketts (HTR) regional biocontainment laboratory (RBL) by the University of Chicago at the U.S. Department of Energy's (DOE's) Argonne National Laboratory in Argonne, Illinois. The HTR Laboratory (HTRL) would be constructed, owned, and operated by the University of Chicago on land leased to it by DOE. The preferred project site is located north of Eastwood Drive and west of Outer Circle Road and is near the biological sciences building. This environmental assessment addresses the potential environmental effects resulting from construction and operation of the proposed facility. The proposed project involves the construction of a research facility with a footprint up to approximately 44,000 ft{sup 2} (4,088 m{sup 2}). The proposed building would house research laboratories, including Biosafety Level 2 and 3 biocontainment space, animal research facilities, administrative offices, and building support areas. The NIH has identified a need for new facilities to support research on potential bioterrorism agents and emerging and re-emerging infectious diseases, to protect the nation from such threats to public health. This research requires specialized laboratory facilities that are designed, managed, and operated to protect laboratory workers and the surrounding community from accidental exposure to agents. The proposed HTRL would provide needed biocontainment space to researchers and promote the advancement of knowledge in the disciplines of biodefense and emerging and re-emerging infectious diseases. Several alternatives were considered for the location of the proposed facility, as well as a no action alternative. The preferred alternative includes the construction of a research facility, up to 44,000 ft{sup 2} (4,088 m{sup 2}), at Argonne National Laboratory, a secure government location. Potential impacts to natural and cultural resources have been

  15. Thunder Bay Terminals Ltd. Site selection to operation: the management function

    Energy Technology Data Exchange (ETDEWEB)

    Cook, P.R.

    1979-08-01

    Thunder Bay Terminals Ltd. is a link in a new transportation system for Canada's natural resources stretching over 3000 miles from British Columbia's mountains to Ontario's lower Great Lakes. Thunder Bay Terminals' plant, now in operation, cost about $70 million and was completed on time and under budget. The paper is the project manager's account of this accomplishment. From site selection through feasibility, engineering and construction to realization, he emphasizes the necessary philosophies for the control of time and money. The computer as a tool is discussed, as well as techniques for procurement.

  16. Two-tier Haddon matrix approach to fault analysis of accidents and cybernetic search for relationship to effect operational control: a case study at a large construction site.

    Science.gov (United States)

    Mazumdar, Atmadeep; Sen, Krishna Nirmalya; Lahiri, Balendra Nath

    2007-01-01

    The Haddon matrix is a potential tool for recognizing hazards in any operating engineering system. This paper presents a case study of operational hazards at a large construction site. The fish bone structure helps to visualize and relate the chain of events, which led to the failure of the system. The two-tier Haddon matrix approach helps to analyze the problem and subsequently prescribes preventive steps. The cybernetic approach has been undertaken to establish the relationship among event variables and to identify the ones with most potential. Those event variables in this case study, based on the cybernetic concepts like control responsiveness and controllability salience, are (a) uncontrolled swing of sheet contributing to energy, (b) slippage of sheet from anchor, (c) restricted longitudinal and transverse swing or rotation about the suspension, (d) guilt or uncertainty of the crane driver, (e) safe working practices and environment.

  17. Criteria for the siting, construction, management and evaluation of low and intermediate activity radioactive waste stores

    International Nuclear Information System (INIS)

    Granero, J.J.

    1986-01-01

    The experience acquired by Spain for the storage of low and intermediate level radioactive wastes, is presented. General considerations related to the technology, financing, administrative measures and risk determination are done. The criteria of site selection for construction and management of the waste storage facility are described, evaluating the specific criteria for the licensing procedure, and taking in account the safety and the radiation protection during periods of the system operation. (M.C.K.) [pt

  18. Construction of Site Risk Model using Individual Unit Risk Model in a NPP Site

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Ho Gon; Han, Sang Hoon [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Since Fukushima accident, strong needs to estimate site risk has been increased to identify the possibility of re-occurrence of such a tremendous disaster and prevent such a disaster. Especially, in a site which has large fleet of nuclear power plants, reliable site risk assessment is very emergent to confirm the safety. In Korea, there are several nuclear power plant site which have more than 6 NPPs. In general, risk model of a NPP in terms of PSA is very complicated and furthermore, it is expected that the site risk model is more complex than that. In this paper, the method for constructing site risk model is proposed by using individual unit risk model. Procedure for the development of site damage (risk) model was proposed in the present paper. Since the site damage model is complicated in the sense of the scale of the system and dependency of the components of the system, conventional method may not be applicable in many side of the problem.

  19. Proposed genetic algorithms for construction site lay out

    NARCIS (Netherlands)

    Mawdesley, Michael J.; Al-Jibouri, Saad H.S.

    2003-01-01

    The positioning of temporary facilities on a construction site is an area of research which has been recognised as important but which has received relatively little attention. In this paper, a genetic algorithm is proposed to solve the problem in which m facilities are to be positioned to n

  20. Insights into Architects’ Future Roles in Off-Site Construction

    Directory of Open Access Journals (Sweden)

    Jianing Luo

    2017-03-01

    Full Text Available Today’s construction industry is overflowing with new ideas about its future. Off-Site Manufacture and Construction (OSCM is at the heart of the modern construction industry. Much has been written about the state and context of OSCM in different countries regarding its perceived benefits and barriers to implementation. Off-site production (OSP plays an important role in improving fragmented construction processes. Although most OSP research targets the attitudes and practices of OSP adoption, there is limited understanding of the philosophical issues underpinning OSP-related architecture. The roles of the architects’ personal philosophies are neglected and this hampers their implementation of OSCM (which has had a largely technical focus. This paper explores the traditional thinking patterns of architects in China and predicts possible future roles for them. It then conceptualizes an “architectural work” mode and a “building product” mode of design and construction and identifies the shortcomings of architects in an OSCM environment. The arguments made are based on practitioners’ perceptions and the first author’s practical experiences of leading several real-life projects in recent years. The findings reveal the implications and significance of the transformation from an “architectural work” mode to a “building product” mode. We foresee a study approach that focuses on the order and rules for OSCM, resulting in architects’ existing mindsets being changed to thinking patterns and design methodologies better suited to OSCM.

  1. Economic and Environmental Evaluation of a Brick Delivery System Based on Multi-Trip Vehicle Loader Routing Problem for Small Construction Sites

    Directory of Open Access Journals (Sweden)

    Heungjo An

    2018-05-01

    Full Text Available While large construction sites have on-site loaders to handle heavy and large packages of bricks, small brick manufacturers employ a truck-mounted loader or sometimes deploy a loader truck to accompany normal brick delivery trucks to small construction sites lacking on-site loaders. It may be very challenging for small contractors to manage a sustainable delivery system that is both cost-effective and environmentally friendly. To address this issue, this paper proposes to solve a multi-trip vehicle loader routing problem by uniquely planning routes and schedules of several types of vehicles considering their synchronized operations at customer sites and multi trips. This paper also evaluates the sustainability of the developed model from both economic and environmental perspectives. Case studies based on small construction sites in the Middle East demonstrate applications of the proposed model to make the most economical plans for delivering bricks. Compared to the single-trip vehicle loader routing problem, the proposed model reduces, on average, 18.7% of the total delivery cost while increasing CO2 emission negligibly. The economic benefit is mainly achieved by reducing the required number of vehicles. Brick plant managers can use the proposed mathematical model to plan the most cost-effective delivery schedules sustainably while minimizing negative environmental effects.

  2. Mechanisation and automation technologies development in work at construction sites

    Science.gov (United States)

    Sobotka, A.; Pacewicz, K.

    2017-10-01

    Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.

  3. Constructive Representation Theory for the Feynman Operator Calculus

    CERN Document Server

    Gill, T L

    2006-01-01

    In this paper, we survey recent progress on the constructive theory of the Feynman operator calculus. We first develop an operator version of the Henstock-Kurzweil integral, and a new Hilbert space that allows us to construct the elementary path integral in the manner originally envisioned by Feynman. After developing our time-ordered operator theory we extend a few of the important theorems of semigroup theory, including the Hille-Yosida theorem. As an application, we unify and extend the theory of time-dependent parabolic and hyperbolic evolution equations. We then develop a general perturbation theory and use it to prove that all theories generated by semigroups are asympotic in the operator-valued sense of Poincar e. This allows us to provide a general theory for the interaction representation of relativistic quantum theory. We then show that our theory can be reformulated as a physically motivated sum over paths, and use this version to extend the Feynman path integral to include more general interaction...

  4. Utilisation of employee assistance programme to reduce absenteeism on construction sites

    OpenAIRE

    2013-01-01

    M.Tech (Construction Management) Many construction companies are beginning to realize the value of their employees. Employees are to a large extent the engine of the organisation. Todays employees are under a lot of pressure and stress from home and at the construction sites. The construction industry just like any other industry, is faced with the challenges of dealing with personal as well as work related problems. These problems they have effect on job performance. An Employee assistanc...

  5. Confined Site Construction: A qualitative investigation of critical issues affecting management of Health and Safety

    OpenAIRE

    Spillane, John P.; Oyedele, Lukumon O.; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E.; Tijani, Iyabo K.

    2011-01-01

    The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, th...

  6. Constructed wetlands for pollution control: processes, performance, design and operation

    National Research Council Canada - National Science Library

    2000-01-01

    .... Types of constructed wetland, major design parameters, role of vegetation, hydraulic patterns, loadings, treatment efficiency, construction, operation and maintenance costs are discussed in depth...

  7. Licensing procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1976-08-01

    For Belgium and Luxembourg, the authorization procedure varies according to the Class in which the installation concerned falls (assigned according to the degree of hazard involved: Classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of Class I and II installations. With respect to Germany also, two such separate authorization are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the 'basic' nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of 'classified' installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of 'classified' installations exist in the United Kingdom. Moreover, there is only one single authorization (the 'site licence'), which is succesively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  8. Authorization procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1974-12-01

    For Belgium and Luxembourg, the authorization procedure varies according to the class in which the installation concerned falls (assigned according to the degree of hazard involved classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of class I and II installations. With respect to Germany also, two such separate authorizations are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the basic nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of classified installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of classified installations exist in the United Kingdom. Moreover, there is only one single authorization (the site licence), which is successively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  9. Effectiveness of Practicing Supply Chain Management in Construction Site

    Directory of Open Access Journals (Sweden)

    Mamter S.

    2014-01-01

    Full Text Available Construction Supply chain management comprised of the network of organization involved in the different processes and activities which produce the material, components and services that come together to design, procurement and deliver a building. It also consists of different organizations involved in the construction process including client/owner, designer, contractor, subcontractor and suppliers. This paper shall present on the implementation of supply chain management in construction and the effectiveness of practicing SCM in construction site. A field study is done from the viewpoint of contractor and consultant then analysed by using average index methods and presented in a statistical analysis. From the analysis, it reveals that effectiveness of practicing the SCM give a lot of good performances and granted benefits to contractor. The statistical analysis produced first ranking effectiveness of SCM is can minimize waste of material and labor for construction project.

  10. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    International Nuclear Information System (INIS)

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development

  11. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development.

  12. Site infrastructure as required during the construction and erection of nuclear power plants

    International Nuclear Information System (INIS)

    Haas, K.F.; Wagner, H.

    1978-01-01

    In general, in an exchange of experience on constructing nuclear power plants priority is given to design and lay-out, financing, quality assurance etc., but in this paper an attempt has been made to describe range and type of site infrastructure required during construction and erection. Site infrastructure will make considerable demands on the planning, supply of material and maintenance that may result from the frequently very isolated location of power plant sites. Examples for specific values and experiences are given for a nuclear power plant with two units on the 1300-MW type at present under construction of the Persian Gulf in Iran. Data concerning the site infrastructure, including examples, are given and explained on the basis of graphs. The site is split up into a technical and a social infrastructure. The main concern of the technical site infrastructure is the timely provision and continuous availability of electric energy, water, communication grids, workshops, warehouses, offices, transport and handling facilities, as well as the provision of heavy load roads, harbour facilities, etc. The social site infrastructure in general comprises accommodation, food supplies and the care and welfare of all site personnel, which includes a hospital, school, self-service shop, and sport and recreation facilities. (author)

  13. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Pechmann, J.H.K.; Scott, D.E.; McGregor, J.H.; Estes, R.A.; Chazal, A.C.

    1993-02-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980's. The Savannah River Ecology Laboratory (SREL) has completed 12 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of refuge ponds'' as alternative breeding sites for amphibians that formerly bred at Sun Bay Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10CFR1022).

  14. Investigation and demonstration of turbidity reduction in stormwater runoff for Oklahoma highway construction sites : final report.

    Science.gov (United States)

    2013-12-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction industry to control the discharge of pollutants from the sites. The construction effluent guidelines or ELGs require construction sites to reduce the pollu...

  15. LLNL Experimental Test Site (Site 300) Potable Water System Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ocampo, R. P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bellah, W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-09-14

    The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well water is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.

  16. Construction and operation of the Spallation Neutron Source: Draft environmental impact statement. Volume 2

    International Nuclear Information System (INIS)

    1998-12-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation Neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulation ring and a second target. Volume 1 of this document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this EIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. This volume contains the following appendices: (A) SNS accident source terms for EIS input; (B) Reports on the selection of alternative sites for the SNS; (C) Letters of consultation on protected species and cultural resources; (D) Ecological resource survey reports and summaries; (E) Descriptions of ORNL research projects in the Walker Branch Watershed; (F) Atmospheric dispersion and dose calculations for normal and accident conditions; (G) Projected air quality modeling effects at NOAA's Walker Branch Monitoring Tower

  17. Environmental assessment for the A-01 outfall constructed wetlands project at the Savannah River Site

    International Nuclear Information System (INIS)

    1998-10-01

    The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed A-01 outfall constructed wetlands project at the Savannah River site (SRS), located near aiken, South Carolina. The proposed action would include the construction and operation of an artificial wetland to treat effluent from the A-01 outfall located in A Area at SRS. The proposed action would reduce the outfall effluent concentrations in order to meet future outfall limits before these go into effect on October 1, 1999. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Parts 1500--1508); and the DOE Regulations for Implementing NEPA (10 CFR Part 1021)

  18. Environmental assessment for the expansion and operation of the Central Shops Borrow Pit at the Savannah River Site

    International Nuclear Information System (INIS)

    1997-03-01

    The Department of Energy (DOE) prepared this Environmental Assessment (EA) to assess the potential environmental impacts of the proposed expansion and operation of an existing borrow pit at the Savannah River Site (SRS), located near Aiken, South Carolina. A borrow pit is defined as an excavated area where material has been dug for use as fill at another location. The proposed action would entail the areal enlargement, continued operation, and eventual close-out of the established facility known as the Central Shops Borrow Pit. Operations at SRS supporting waste site closure and the construction and maintenance of site facilities and infrastructure require readily available suitable soil for use as fill material. With the recent depletion of the other existing on-site sources for such material, DOE proposes to expand the existing facility. The National Environmental Policy Act requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described herein, DOE will either publish a Finding of No Significant Impact or prepare an Environmental Impact Statement (EIS)

  19. Biological/ecological investigations parallel to wind power plant construction and operation. Final report. Biologisch-oekologische Begleituntersuchungen zum Bau und Betrieb von Windkraftanlagen. Endbericht

    Energy Technology Data Exchange (ETDEWEB)

    Boettger, M; Clemens, T; Grote, G; Hartmann, G; Hartwig, E; Lammen, C; Vauk-Hentzelt, E

    1990-01-01

    In view of the fact that there is no validated knowledge in Germany on the environmental effects of wind power plant construction and operation, the Norddeutsche Naturschutzakademie was asked by the BMFT to carry out a study in this field. The following problems were investigated: General ecological assessment and ornithological assessment of sites; investigations parallel to plant construction and operation, ecological effects; long-term effects; proposal of landscape conservation measures in regions with wind power plants. The report presents the results of the investigation. (BWI).

  20. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant...

  1. A study on air pollution concentration at Desa parkcity construction site

    African Journals Online (AJOL)

    This study assesses the effect of construction workers exposure towards the air pollution to the correlation between meteorological factor with the particulate matter and other gases concentration at a construction site in DesaParkcity. The concentration of PM was collected by using low volume sampler meanwhile CO, CO2, ...

  2. Oscillator construction of su(n|m) Q-operators

    Energy Technology Data Exchange (ETDEWEB)

    Frassek, Rouven, E-mail: rfrassek@physik.hu-berlin.de [Institut fuer Mathematik und Institut fuer Physik, Humboldt-Universitaet zu Berlin, Johann von Neumann-Haus, Rudower Chaussee 25, 12489 Berlin (Germany); Max-Planck-Institut fuer Gravitationsphysik, Albert-Einstein-Institut, Am Muehlenberg 1, 14476 Potsdam (Germany); Lukowski, Tomasz, E-mail: lukowski@mathematik.hu-berlin.de [Institut fuer Mathematik und Institut fuer Physik, Humboldt-Universitaet zu Berlin, Johann von Neumann-Haus, Rudower Chaussee 25, 12489 Berlin (Germany); Meneghelli, Carlo, E-mail: carlo@aei.mpg.de [Institut fuer Mathematik und Institut fuer Physik, Humboldt-Universitaet zu Berlin, Johann von Neumann-Haus, Rudower Chaussee 25, 12489 Berlin (Germany); Max-Planck-Institut fuer Gravitationsphysik, Albert-Einstein-Institut, Am Muehlenberg 1, 14476 Potsdam (Germany); Staudacher, Matthias, E-mail: matthias@aei.mpg.de [Institut fuer Mathematik und Institut fuer Physik, Humboldt-Universitaet zu Berlin, Johann von Neumann-Haus, Rudower Chaussee 25, 12489 Berlin (Germany); Max-Planck-Institut fuer Gravitationsphysik, Albert-Einstein-Institut, Am Muehlenberg 1, 14476 Potsdam (Germany)

    2011-09-01

    We generalize our recent explicit construction of the full hierarchy of Baxter Q-operators of compact spin chains with su(n) symmetry to the supersymmetric case su(n|m). The method is based on novel degenerate solutions of the graded Yang-Baxter equation, leading to an amalgam of bosonic and fermionic oscillator algebras. Our approach is fully algebraic, and leads to the exact solution of the associated compact spin chains while avoiding Bethe ansatz techniques. It furthermore elucidates the algebraic and combinatorial structures underlying the system of nested Bethe equations. Finally, our construction naturally reproduces the representation, due to Z. Tsuboi, of the hierarchy of Baxter Q-operators in terms of hypercubic Hasse diagrams.

  3. An application of the Pareto method in surveys to diagnose managers' and workers' perception of occupational safety and health on selected Polish construction sites.

    Science.gov (United States)

    Obolewicz, Jerzy; Dąbrowski, Andrzej

    2017-11-16

    The construction industry is an important sector of the economy in Poland. According to the National Labour Inspectorate (PIP) data of 2014, the number of victims of fatal accidents in the construction sector amounted to 80 as compared with 187 injured in all other sectors of economy in Poland. This article presents the results of surveys on the impact of construction worker behaviour on the occupational safety and health outcomes. The surveys took into account the point of view of both construction site management (tactical level) and construction workers (operational level). For the analysis of results, the method of numerical taxonomy and Pareto charts was employed, which allowed the authors to identify the areas of occupational safety and health at both an operational and a tactical level, in which improvement actions needed to be proposed for workers employed in micro, small, medium and large construction enterprises.

  4. AN ACD DIAGRAM DEVELOPED FOR SIMULATING A BRIDGE CONSTRUCTION OPERATION

    Directory of Open Access Journals (Sweden)

    Fahimeh Zaeri

    2014-12-01

    Full Text Available Success in the performance of construction projects can be substantially enhanced if plans are formulated more realistically, ahead of time. Planning includes identifying project activities, required resources, interdependencies, and also recognizing the uncertainties in the duration of activities. Inherent features of construction projects, such as high repetition, complexity and uniqueness on the one hand, and advances in technology and methodologies on the other, create more difficulties in planning construction delivery. This is true for bridge operations. This study presents an innovative incremental beam launching method with twin truss gantry. This construction method has significant advantages in terms of cost and speed of performance, but increases the level of planning and management required for the bridge operation. Further, because of the newness of the method, no specific Work Breakdown Structure nor conceptual framework has been developed as yet. The aim of the current study is to explore the use of a simulation-based tool (EZStrobe to facilitate the planning and management of a bridge construction operation (case study. The process followed in the development of a conceptual framework for the case study project is described. An Activity Cycle Diagram is produced alongside the conceptual framework and process models, with the intent of illustrating the key steps in the simulation modelling method. The developed models could assist in scheduling and controlling inherent construction features such as uncertainties, complexities, and repetitions in bridge construction projects, consequently improving their delivery.

  5. Quality assurance during site construction of nuclear power plants

    International Nuclear Information System (INIS)

    1981-01-01

    This Safety Guide provides requirements and recommendations related to the establishment and implementation of a quality assurance programme for the site construction activities at nuclear power plants. These include activities such as fabricating, erecting, installing, handling, storing, cleaning, flushing, inspecting, testing, modifying, repairing, and maintaining

  6. Assumption and program of the earlier stage construction of L/ILW disposal site

    International Nuclear Information System (INIS)

    Li Xuequn; Chen Shi; Li Xinbang

    1993-01-01

    The authors analysed the production and treatment of low- and intermediate-level radwastes (L/ILW) in China. Some problems and situation in this field are introduced. Over the past ten years, preliminary efforts have been made by CNNC (China National Nuclear Corporation) in policy, law and rules, developing program, management system, siting, engineering techniques, and safety assessment for radwaste disposal. The investment of the earlier stage work of L/ILW disposal site construction is estimated, the program and assumption to disposal site construction of the L/ILW are reviewed

  7. Construction of adjoint operators for coupled equations depending on different variables

    International Nuclear Information System (INIS)

    Hoogenboom, J.E.

    1986-01-01

    A procedure is described for the construction of the adjoint operator matrix in case of coupled equations defining quantities that depend on different sets of variables. This case is not properly treated in the literature. From this procedure a simple rule can be deduced for the construction of such adjoint operator matrices

  8. Operational Implementation of the MARSSIM Process at the Wayne Interim Storage Site

    International Nuclear Information System (INIS)

    Hays, D. C. Jr.; Trujillo, P. A. IV.; Zoller, S. G.

    2002-01-01

    This paper describes the methodologies behind the operational implementation of the Multi Agency Radiation Site Survey and Investigation Manual (MARSSIM) process at the Wayne Interim Storage Site (WISS). The United States Army Corps of Engineers (USACE) and Environmental Chemical Corporation (ECC) have implemented the MARSSIM process using various surveys producing raw data. The final remedial status of a survey unit is derived through data reduction, while maintaining a high degree of efficiency in the construction aspects of the remedial action. Data reduction of field measurements is accomplished by merging the data outputs of a Digital Global Positioning System, an exposure rate meter, and laboratory analyses to produce maps which present exposure rates, elevations, survey unit boundaries, direct measurement locations, and sampling locations on a single map. The map serves as a data-posting plot and allows the project team to easily judge the survey unit's remedial status. The operational implementation of the MARSSIM process has been successful in determining the eligibility of survey units for final status surveys at the WISS and also in demonstrating final status radiological and chemical conditions while maintaining an efficient remedial action effort

  9. The occupational safety on the construction sites of the farm production buildings in Finland

    Directory of Open Access Journals (Sweden)

    M. Hellstedt

    2013-09-01

    Full Text Available The size of farms has increased considerably during Finland's EU membership. The growth has meant big investments in the new production buildings. The buildings have been switched to big industrialhall- like constructions from small-scale ones which have contained own timber and own work contribution. The objective of the project financed by Farmers' Social Insurance Institution was to improve occupational safety on farm building construction and renovation sites by disseminating current safety practices and by developing ways of action which are better than the prevailing ones. The project consisted of a literature review, statistical analysis, as well as a farmer and designer interviews. In the statistical analysis the MATA occupational injuries insurance claims database on farmers’ claims during construction and renovation work for the years 2005 - 2008 was compared with the register of Federation of Accident Insurance Institutions on the construction workers' injuries. In comparing the reasons of the accidents a clear difference was found; poor scaffoldings and ladders are still the main culprits on farm accidents. Farmer interviews were used to assess occupational safety measures on the construction site, occurred injuries and their types, nearmiss situations and the underlying factors which have led to the injuries. Also construction safety deficiencies as well as the direct and indirect costs caused for instance because of the delay in completion of construction project were discussed. Designer interviews aimed to find out how occupational safety and health considerations are taken into account in farm building planning and counseling, and how this experience of the designers should be utilized in order to improve safety at the construction sites on farms. Farmers knew their obligations on occupational safety poorly. The situation was further worsened by the fact that on the site the supervisor tasks were only nominally executed. The

  10. Fermionic construction of vertex operators for twisted affine algebras

    International Nuclear Information System (INIS)

    Frappat, L.; Sorba, P.; Sciarrino, A.

    1988-03-01

    We construct vertex operator representations of the twisted affine algebras in terms of fermionic (or parafermionic in some cases) elementary fields. The folding method applied to the extended Dynkin diagrams of the affine algebras allows us to determine explicitly these fermionic fields as vertex operators

  11. Pattern of accidents in building construction sites in Obio Akpor ...

    African Journals Online (AJOL)

    Background: Building construction workers are engaged in a dangerous job, exposing them ... The leading cause building site accidents include falls from unsafe working ... Data collected in Excel spread sheet were analyzed and presented in ...

  12. BIM-Integrated Construction Operation Simulation for Just-In-Time Production Management

    Directory of Open Access Journals (Sweden)

    WoonSeong Jeong

    2016-10-01

    Full Text Available Traditional construction planning, which depends on historical data and heuristic modification, prevents the integration of managerial details such as productivity dynamics. Specifically, the distance between planning and execution brings cost overruns and duration extensions. To minimize variations, this research presents a Building Information Modeling (BIM-integrated simulation framework for predicting productivity dynamics at the construction planning phase. To develop this framework, we examined critical factors affecting productivity at the operational level, and then forecast the productivity dynamics. The resulting plan includes specific commands for retrieving the required information from BIM and executing operation simulations. It consists of the following steps: (1 preparing a BIM model to produce input data; (2 composing a construction simulation at the operational level; and (3 obtaining productivity dynamics from the BIM-integrated simulation. To validate our framework, we applied it to a structural steel model; this was due to the significance of steel erections. By integrating BIM with construction operation simulations, we were able to create reliable construction plans that adapted to project changes. Our results show that the developed framework facilitates the reliable prediction of productivity dynamics, and can contribute to improved schedule reliability, optimized resource allocation, cost savings associated with buffers, and reduced material waste.

  13. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site

    International Nuclear Information System (INIS)

    Scott, D.E.; Chazel, A.C.; Pechmann, J.H.K.; Estes, R.A.

    1993-06-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980's. The Savannah River Ecology Laboratory (SREL) has completed 14 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ''refuge ponds'' as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10 CFR 1022)

  14. Rocketdyne Propulsion & Power DOE Operations Annual Site Environmental Report 1996

    Energy Technology Data Exchange (ETDEWEB)

    Tuttle, R. J. [The Boeing Company, Canoga Park, CA (United States)

    1997-11-10

    This annual report discusses environmental monitoring at two manufacturing and test operations sites operated in the Los Angeles area by Rocketdyne Propulsion & Power of Boeing North American. Inc. (formerly Rockwell International Corporation). These are identified as the Santa Susana Field Laboratory (SSFL and the De Soto site. The sites have been used for manufacturing; R&D, engineering, and testing in a broad range of technical fields, primarily rocket engine propulsion and nuclear reactor technology. The De Soto site essentially comprises office space and light industry with no remaining radiological operations, and has little potential impact on the environment. The SSFL site, because of its large size (2.668 acres), warrants comprehensive monitoring to ensure protection of the environment.

  15. Night-time road construction operations synthesis of practice.

    Science.gov (United States)

    2008-05-01

    report synthesizes existing literature on nighttime construction operations, identifies gaps in the current state of knowledge, and summarizes research in progress studies that are planned or underway. The literature review and synthesis found the fo...

  16. Differences among Job Positions Related to Communication Errors at Construction Sites

    Science.gov (United States)

    Takahashi, Akiko; Ishida, Toshiro

    In a previous study, we classified the communicatio n errors at construction sites as faulty intention and message pattern, inadequate channel pattern, and faulty comprehension pattern. This study seeks to evaluate the degree of risk of communication errors and to investigate differences among people in various job positions in perception of communication error risk . Questionnaires based on the previous study were a dministered to construction workers (n=811; 149 adminis trators, 208 foremen and 454 workers). Administrators evaluated all patterns of communication error risk equally. However, foremen and workers evaluated communication error risk differently in each pattern. The common contributing factors to all patterns wer e inadequate arrangements before work and inadequate confirmation. Some factors were common among patterns but other factors were particular to a specific pattern. To help prevent future accidents at construction sites, administrators should understand how people in various job positions perceive communication errors and propose human factors measures to prevent such errors.

  17. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To...

  18. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    Directory of Open Access Journals (Sweden)

    Spillane, John P

    2011-12-01

    Full Text Available The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.

  19. Experience in construction and operation of HWR plants in Argentina

    International Nuclear Information System (INIS)

    Madero, C.C.; Cosentino, J.O.

    1982-01-01

    ''ATUCHA I'', the first nuclear power plant in Argentina, is in commerical operation since 1974 with a high capacity factor. The reactor is based on the MZFR prototype designed by SIEMENS with natural uranium and heavy water and PWR technic. The plant was built by SIEMENS on a turnkey contract and was rated 340 MWe. The offer presented in that opportunity by KWU was based on two reactors (ATUCHA I type) inside one single containment, due to the limitation in power of the reactor. Subsequent changes in the nature of the contract resulted in an active participation of CNEA engineering groups in the erection and commissioning of the reactor. In 1978 the national government approved a nuclear power plan to install four 600 MWe HWR plants until 1995. To start implementing this program, CNEA called for tenders for the supply of components and services for the ATUCHA II plant, in connection with the establishment of a local engineering company and the supply and construction of a heavy water production plant. In 1980 a contract was signed with KWU and the local company ENACE was formed to act as architect engineer and site coordinator. The plant will be located in the ATUCHA I site and the reactor will be similar but double in power to that one. Following the schedule of the nuclear plan, CNEA has just started preliminary studies for the next nuclear plant. ENACE will be responsible for the preparation of an offer for an ATUCHA reactor type. Local engineering and manufacturing firms, upon request and coordination from CNEA, and evaluating the local capacity to participate in the design and construction of a CANDU type nuclear plant. Final decision on this fourth nuclear plant in Argentina will be taken middle 1983. (J.P.N.)

  20. Draft supplement to final environmental statement related to construction and operation of Clinch River Breeder Reactor Plant. Docket No. 50-537

    International Nuclear Information System (INIS)

    1982-07-01

    Information is presented concerning the site and environs; facility description; environmental impacts due to construction; environmental impacts of plant operation; environmental measurement and monitoring programs; environmental impacts of postulated accidents; need for the proposed facility; alternatives; evaluation of the proposed action; and discussion of comments received on the draft environmental statement

  1. Selection of adequate site location during early stages of construction project management: A multi-criteria decision analysis approach

    Science.gov (United States)

    Marović, Ivan; Hanak, Tomaš

    2017-10-01

    In the management of construction projects special attention should be given to the planning as the most important phase of decision-making process. Quality decision-making based on adequate and comprehensive collaboration of all involved stakeholders is crucial in project’s early stages. Fundamental reasons for existence of this problem arise from: specific conditions of construction industry (final products are inseparable from the location i.e. location has a strong influence of building design and its structural characteristics as well as technology which will be used during construction), investors’ desires and attitudes, and influence of socioeconomic and environment aspects. Considering all mentioned reasons one can conclude that selection of adequate construction site location for future investment is complex, low structured and multi-criteria problem. To take into account all the dimensions, the proposed model for selection of adequate site location is devised. The model is based on AHP (for designing the decision-making hierarchy) and PROMETHEE (for pairwise comparison of investment locations) methods. As a result of mixing basis feature of both methods, operational synergies can be achieved in multi-criteria decision analysis. Such gives the decision-maker a sense of assurance, knowing that if the procedure proposed by the presented model has been followed, it will lead to a rational decision, carefully and systematically thought out.

  2. Safety leadership at construction sites: the importance of rule-oriented and participative leadership.

    Science.gov (United States)

    Grill, Martin; Pousette, Anders; Nielsen, Kent; Grytnes, Regine; Törner, Marianne

    2017-07-01

    Objectives The construction industry accounted for >20% of all fatal occupational accidents in Europe in 2014. Leadership is an essential antecedent to occupational safety. The aim of the present study was to assess the influence of transformational, active transactional, rule-oriented, participative, and laissez-faire leadership on safety climate, safety behavior, and accidents in the Swedish and Danish construction industry. Sweden and Denmark are similar countries but have a large difference in occupational accidents rates. Methods A questionnaire study was conducted among a random sample of construction workers in both countries: 811 construction workers from 85 sites responded, resulting in site and individual response rates of 73% and 64%, respectively. Results The results indicated that transformational, active transactional, rule-oriented and participative leadership predict positive safety outcomes, and laissez-faire leadership predict negative safety outcomes. For example, rule-oriented leadership predicts a superior safety climate (β=0.40, Pleadership on workers' safety behavior was moderated by the level of participative leadership (β=0.10, Pleadership behaviors on safety outcomes were largely similar in Sweden and Denmark. Rule-oriented and participative leadership were more common in the Swedish than Danish construction industry, which may partly explain the difference in occupational accident rates. Conclusions Applying less laissez-faire leadership and more transformational, active transactional, participative and rule-oriented leadership appears to be an effective way for construction site managers to improve occupational safety in the industry.

  3. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    OpenAIRE

    Spillane, John P; Oyedele, Lukumon O; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E; Tijani, Iyabo K

    2011-01-01

    The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues...

  4. Lessons Learned From a Decade of Design, Construction, and Operations of the Environmental Management Waste Management Facility in Oak Ridge, Tennessee - 12062

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Joe [Bechtel National, Inc., Oak Ridge, TN 37830 (United States)

    2012-07-01

    The Environmental Management Waste Management Facility (EMWMF) is the Department of Energy's on-site disposal facility for radioactive and hazardous waste generated by the CERCLA cleanup of the Oak Ridge Reservation (ORR). EMWMF recently completed building out to its maximum site capacity and is approaching a decade of operating experience. In meeting the challenges of design, construction, and operation of a mixed waste and low-level radioactive waste disposal facility within the framework of CERCLA, the Bechtel Jacobs Company LLC (BJC) project team learned valuable lessons that may be beneficial to other disposal facilities. Since project inception in 1998, the scope of the effort includes five regulator-approved designs, four phases of construction, and utilization of half of EMWMF's 1.63 M m{sup 3} of airspace during disposal of waste streams from across the ORR. Funding came from the broadest possible range of sources - privatization, American Recovery and Reinvestment Act, and two funding appropriation accounts. In the process of becoming the cost effective disposal outlet for the majority of the ORR cleanup waste, EMWMF overcame numerous challenges. Lessons learned were a key factor in achieving that success. Many of EMWMF's challenges are common to other disposal facilities. Sharing the successes and lessons learned will help other facilities optimize design, construction, and operations. (author)

  5. Selection of nest-site habitat by interior least terns in relation to sandbar construction

    Science.gov (United States)

    Sherfy, Mark H.; Stucker, Jennifer H.; Buhl, Deborah A.

    2012-01-01

    Federally endangered interior least terns (Sternula antillarum) nest on bare or sparsely vegetated sandbars on midcontinent river systems. Loss of nesting habitat has been implicated as a cause of population declines, and managing these habitats is a major initiative in population recovery. One such initiative involves construction of mid-channel sandbars on the Missouri River, where natural sandbar habitat has declined in quantity and quality since the late 1990s. We evaluated nest-site habitat selection by least terns on constructed and natural sandbars by comparing vegetation, substrate, and debris variables at nest sites (n = 798) and random points (n = 1,113) in bare or sparsely vegetated habitats. Our logistic regression models revealed that a broader suite of habitat features was important in nest-site selection on constructed than on natural sandbars. Odds ratios for habitat variables indicated that avoidance of habitat features was the dominant nest-site selection process on both sandbar types, with nesting terns being attracted to nest-site habitat features (gravel and debris) and avoiding vegetation only on constructed sandbars, and avoiding silt and leaf litter on both sandbar types. Despite the seemingly uniform nature of these habitats, our results suggest that a complex suite of habitat features influences nest-site choice by least terns. However, nest-site selection in this social, colonially nesting species may be influenced by other factors, including spatial arrangement of bare sand habitat, proximity to other least terns, and prior habitat occupancy by piping plovers (Charadrius melodus). We found that nest-site selection was sensitive to subtle variation in habitat features, suggesting that rigor in maintaining habitat condition will be necessary in managing sandbars for the benefit of least terns. Further, management strategies that reduce habitat features that are avoided by least terns may be the most beneficial to nesting least terns.

  6. Construction, testing, and initial operation of Fort St. Vrain PCRV

    International Nuclear Information System (INIS)

    Ople, F.S. Jr.; Neylan, A.J.

    1975-01-01

    The Fort St. Vrain (FSV) Nuclear Generating Station is the first station in the USA to use a prestressed concrete reactor vessel (PCRV). The PCRV was designed and constructed by General Atomic. Construction of the PCRV was completed in 1970; the pressure and leak tests were completed in 1971. The structural behavior of the PCRV has been monitored by installed instrumentation since start of construction. The highlights of the actual construction, testing, and initial operation of the PCRV, including a comparison of structural behavior, where possible, between observed data and analytical predictions. (U.S.)

  7. Shortening of construction period of nuclear power plant. Activities of construction industry on construction period shortening

    International Nuclear Information System (INIS)

    Kamata, Hirofumi

    2011-01-01

    Total construction period could be shorten by prefabricating structures efficiently in another yard and reducing working hours on site, which would reduce work at height or congestion work and also upgrade safety at work. Construction period shortening would surely reduce expenses during work and advance operation start of electric utilities. Construction of reactor building, turbine building, water intake and drainage canal was performed on a relatively large scale and a big share of whole schedule. This article summarized basic technologies to shorten construction period for reactor building/turbine building and water intake and drainage canal. Advanced methods of reactor building/turbine building; (1) modularization of equipment and skeleton, (2) utilization of concrete mold, reinforcing bar and steel frame, (3) precedent steel frame method and (4) steel plate reinforced concrete (SC) method, were outlined and their application examples were shown to reduce work on site and improve work efficiency. As for water intake and drainage canal construction, (1) precast concrete method, (2) SC method and (3) steel plate shell method were described with application examples. Construction procedures and problems using mega block method for water intake and drainage canal were also introduced. (T. Tanaka)

  8. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada National Security Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    International Nuclear Information System (INIS)

    2010-01-01

    The Nevada National Security Site (NNSS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NNSS and National Security Technologies, LLC (NSTec) is the Management and Operations contractor. Access on and off the NNSS is tightly controlled, restricted, and guarded on a 24-hour basis. The NNSS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NNSS. The Area 5 Radioactive Waste Management Site (RWMS) is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NNSS (Figure 1), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. The site will be used for the disposal of regulated Asbestiform Low-Level Waste (ALLW), small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains Polychlorinated Biphenyl (PCB) Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. Waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM) and PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water. The term asbestiform is

  9. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada National Security Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Programs

    2010-10-04

    The Nevada National Security Site (NNSS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NNSS and National Security Technologies, LLC (NSTec) is the Management and Operations contractor. Access on and off the NNSS is tightly controlled, restricted, and guarded on a 24-hour basis. The NNSS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NNSS. The Area 5 Radioactive Waste Management Site (RWMS) is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NNSS (Figure 1), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. The site will be used for the disposal of regulated Asbestiform Low-Level Waste (ALLW), small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains Polychlorinated Biphenyl (PCB) Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. Waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM) and PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water. The term asbestiform is

  10. TPX tokamak construction management

    International Nuclear Information System (INIS)

    Knutson, D.; Kungl, D.; Seidel, P.; Halfast, C.

    1995-01-01

    A construction management contract normally involves the acquisition of a construction management firm to assist in the design, planning, budget conformance, and coordination of the construction effort. In addition the construction management firm acts as an agent in the awarding of lower tier contracts. The TPX Tokamak Construction Management (TCM) approach differs in that the construction management firm is also directly responsible for the assembly and installation of the tokamak including the design and fabrication of all tooling required for assembly. The Systems Integration Support (SIS) contractor is responsible for the architect-engineering design of ancillary systems, such as heating and cooling, buildings, modifications and site improvements, and a variety of electrical requirements, including switchyards and >4kV power distribution. The TCM will be responsible for the procurement of materials and the installation of the ancillary systems, which can either be performed directly by the TCM or subcontracted to a lower tier subcontractor. Assurance that the TPX tokamak is properly assembled and ready for operation when turned over to the operations team is the primary focus of the construction management effort. To accomplish this a disciplined constructability program will be instituted. The constructability effort will involve the effective and timely integration of construction expertise into the planning, component design, and field operations. Although individual component design groups will provide liaison during the machine assembly operations, the construction management team is responsible for assembly

  11. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  12. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  13. Writing for the web composing, coding, and constructing web sites

    CERN Document Server

    Applen, JD

    2013-01-01

    Writing for the Web unites theory, technology, and practice to explore writing and hypertext for website creation. It integrates such key topics as XHTML/CSS coding, writing (prose) for the Web, the rhetorical needs of the audience, theories of hypertext, usability and architecture, and the basics of web site design and technology. Presenting information in digestible parts, this text enables students to write and construct realistic and manageable Web sites with a strong theoretical understanding of how online texts communicate to audiences. Key features of the book

  14. Modeling injury rates as a function of industrialized versus on-site construction techniques.

    Science.gov (United States)

    Rubio-Romero, J C; Suárez-Cebador, M; Abad, Jesús

    2014-05-01

    It is often predicted that the industrialization of building activities will lead to a reduction of accident rates in the construction sector, particularly as a result of switching activities from building sites to factories. However, to date no scientific research has provided objective quantitative results to back up this claim. The aim of this paper is to evaluate how industrialization affects the accident rate in different industrialized building systems in Spain. Our results revealed that the industrialized steel modular system presents the lowest accident rate, while the highest accident rate was recorded in the construction method with cast-in-place concrete. The lightweight construction system also presents a high accident rate. Accordingly, industrialized building systems cannot claim to be safer than traditional ones. The different types of "on-site work" seem to be the main variable which would explain the accident rates recorded in industrialized construction systems. Copyright © 2014 Elsevier Ltd. All rights reserved.

  15. Automating ATLAS Computing Operations using the Site Status Board

    CERN Document Server

    Andreeva, J; The ATLAS collaboration; Campana, S; Di Girolamo, A; Espinal Curull, X; Gayazov, S; Magradze, E; Nowotka, MM; Rinaldi, L; Saiz, P; Schovancova, J; Stewart, GA; Wright, M

    2012-01-01

    The automation of operations is essential to reduce manpower costs and improve the reliability of the system. The Site Status Board (SSB) is a framework which allows Virtual Organizations to monitor their computing activities at distributed sites and to evaluate site performance. The ATLAS experiment intensively uses SSB for the distributed computing shifts, for estimating data processing and data transfer efficiencies at a particular site, and for implementing automatic exclusion of sites from computing activities, in case of potential problems. ATLAS SSB provides a real-time aggregated monitoring view and keeps the history of the monitoring metrics. Based on this history, usability of a site from the perspective of ATLAS is calculated. The presentation will describe how SSB is integrated in the ATLAS operations and computing infrastructure and will cover implementation details of the ATLAS SSB sensors and alarm system, based on the information in SSB. It will demonstrate the positive impact of the use of SS...

  16. Assessment of the living and workplace health and safety conditions of site-resident construction workers in Tehran, Iran.

    Science.gov (United States)

    Mohseni, Peyman Hossein; Farshad, Ali Asghar; Mirkazemi, Roksana; Orak, Rouhangiz Jamshidi

    2015-01-01

    The purpose of this study was to assess living and workplace safety conditions of construction workers in Tehran, Iran. This cross-sectional study was conducted among 410 construction sites in a municipal area of Tehran whose municipal building permits were issued in 2011. Data on ventilation, workplace safety and hygiene were collected by direct observation and interviews with site foremen. Noise levels were estimated from 10 sound-level-meter stations in the municipality area. Lack of ventilation in the workers' rooms was abundant. Bathrooms were unhygienic and minimum requirements such as lighting and ventilation did not exist in 80% of the cases. In nearly 50% of large construction sites, sewage and garbage disposal were inappropriate. Elevator safety was poor at all sites and no measures for fall prevention were present in over 88% of active construction sites. This study showed that the mean 24-h equivalent continuous sound level Leq was over 70 dB in 80% of the sites during weekdays. The results of this study revealed poor health and safety living and working conditions of construction workers in Tehran.

  17. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site

    International Nuclear Information System (INIS)

    Scott, D.E.; Pechmann, J.H.K.; Knox, J.N.; Estes, R.A.; McGregor, J.H.; Bailey, K.

    1988-12-01

    The Savannah River Ecology Laboratory has completed 10 years of ecological studies related to the construction of the Defense Waste Processing Facility (DWPF) on the Savannah River Site. This progress report examines water quality studies on streams peripheral to the DWPF construction site and examines the effectiveness of ''refuge ponds'' in ameliorating the effects of construction on local amphibians. Individual papers on these topics are indexed separately. 93 refs., 15 figs., 15 tabs

  18. Surgical site infections in paediatric otolaryngology operative procedures.

    Science.gov (United States)

    Ifeacho, S N; Bajaj, Y; Jephson, C G; Albert, D M

    2012-07-01

    An assessment of the rate of surgical site infections associated with elective paediatric otolaryngology surgical procedures. Prospective data was collected for a 3-week period for all children undergoing surgery where either mucosa or skin was breached. The parents of the children were requested to complete a questionnaire at 30 days after the operation. Data was collected on 80 consecutive cases. The majority of cases were admitted on the day of the procedure. The procedures included adenotonsillectomy (24), grommets (12), cochlear implantation (6), bone-anchored hearing aid (2), submandibular gland excision (1), branchial sinus excision (1), cystic hygroma excision (3), nasal glioma excision (1), microlaryngobronchoscopy (13), tracheostomy (3) and other procedures (14). Nearly half the cases had more than one operation done at the same time. 26/80 (32.5%) patients had a temporary or permanent implant inserted at the time of operation (grommet, bone-anchored hearing aid, cochlear implant). 25/80 (31%) operative fields were classed as clean and 55/80 (68.7%) as clean contaminated operations. The duration of the operation varied from 6 min to 142 min. Hospital antibiotic protocol was adhered to in 69/80 (86.3%) cases but not in 11/80 cases. In our series, 3/80 (3.7%) patients had an infection in the postoperative period. Surgical site infections do occur at an appreciable rate in paediatric otolaryngology. With the potential for serious consequences, reduction in the risk of surgical site infections is important. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  19. Construction and operation of the Spallation Neutron Source: Draft environmental impact statement. Volume 1

    International Nuclear Information System (INIS)

    1998-12-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation Neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulation ring and a second target. The US needs a high-flux, short-pulsed neutron source to provide the scientific and industrial research communities with a much more intense source of pulsed neutrons for neutron scattering research than is currently available, and to assure the availability of a state-of-the-art facility in the decades ahead. This next-generation neutron source would create new scientific and engineering opportunities. In addition, it would help replace the neutron science capacity that will be lost by the eventual shutdown of existing sources as they reach the end of their useful operating lives in the first half of the next century. This document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this EIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. The No-Action Alternative describes the expected condition of the environment if no action were taken. Four siting alternatives for the Spallation Neutron Source are evaluated: Oak Ridge National Laboratory, Oak Ridge, TN, (preferred alternative); Argonne National Laboratory, Argonne, IL (US); Brookhaven National Laboratory, Upton, NY; and Los Alamos National Laboratory, Los Alamos, NM

  20. Non-Operational Property Evaluation for the Hanford Site River Corridor - 12409

    Energy Technology Data Exchange (ETDEWEB)

    Lowe, John [CH2M HILL, Richland, Washington 99354 (United States); Aly, Alaa [CH2M HILL Plateau Remediation Company and INTERA Incorporated, Richland, Washington 99354 (United States)

    2012-07-01

    The Hanford Site River Corridor consists of the former reactor areas of the 100 Areas and the former industrial (fuel processing) area in the 300 Area. Most of the waste sites are located close to the decommissioned reactors or former industrial facilities along the Columbia River. Most of the surface area of the River Corridor consists of land with little or no subsurface infrastructure or indication of past or present releases of hazardous constituents, and is referred to as non-operational property or non-operational area. Multiple lines of evidence have been developed to assess identified fate and transport mechanisms and to evaluate the potential magnitude and significance of waste site-related contaminants in the non-operational area. Predictive modeling was used for determining the likelihood of locating waste sites and evaluating the distribution of radionuclides in soil based on available soil concentration data and aerial radiological surveys. The results of this evaluation indicated: 1) With the exception of stack emissions, transport pathways associated with waste site contaminants are unlikely to result in dispersion of contaminants in soil away from operational areas, 2) Stack emissions that may have been associated with Hanford Site operations generally emitted short-lived and/or gaseous radionuclides, and (3) the likelihood of detecting elevated radionuclide concentrations or other waste sites in non-operational area soils is very small. The overall conclusions from the NPE evaluation of the River Corridor are: - With the exception of stack emissions to the air, transport pathways associated with waste site contaminants are unlikely to result in dispersion of contaminants in soil away from operational areas. While pathways such as windblown dust, overland transport and biointrusion have the potential for dispersing waste site contaminants, the resulting transport is unlikely to result in substantial contamination in non-operational areas. - Stack

  1. Construction of the Savannah River Ecology Laboratory Conference Center

    International Nuclear Information System (INIS)

    1993-07-01

    This Environmental Assessment (EA) reviews the environmental consequences associated with the proposed action of granting a site use permit to construct and operate a conference center on an approximately 70-acre tract of land on the Savannah River Site (SRS). While the proposed action requires an administrative decision by DOE, this EA reviews the linked action of physically constructing and operating a conference center. The SRS is a DOE-owned nuclear production facility encompassing approximately 200,000 acres in southwestern South Carolina. The proposed conference center would have an area of approximately 4,000 square feet, and would infrequently accommodate as many as 150 people, with the average being about 20 people per day. In addition to the No-Action alternative, under which the Research Foundation would not require the 70-acre tract of SRS land for a conference center, this EA considers site preservation. Under Site Preservation only minimal activities necessary to the SRS mission would occur, thereby establishing the lower limits of environmental consequences. A review conducted under the SRS permitting process identified no other forms of possible site development. Similarly, SRS areas identified in the Nuclear Complex Reconfiguration Site Proposal (DOE, 199la) do not include the conference center site area in proposed weapons complex reconfiguration activities. As a consequence, this EA does not consider other forms of possible site development as alternatives. The potential environmental consequences associated with the action of constructing and operating a conference center include impacts to cultural resources and impacts from construction activities, primarily related to land clearing (5 to 10 acres) and providing access to the site

  2. Research Trends on Benefits of Implementing Constructability, Operability, and Maintainability

    Directory of Open Access Journals (Sweden)

    Kordestani Ghaleenoe, N.

    2017-07-01

    Full Text Available Despite allocating huge budgets to civil engineering projects, detailed planning, and employing human resources, project managers still face time, cost, and quality constraints. Most of these challenges are due to a lack of integration of different project phases and the limitations of the presence of construction and maintenance contractors in the initial stages of the project. Considering the benefits of applying constructability, operability, and maintainability (COM concepts, many problems caused by lack of coordination, or duplications and weakness in management, and also time and extra costs due to lack of presence of construction and maintenance contractors in the early stages of the project are resolvable. In this regard, various studies have investigated the benefits of applying these concepts; however, there has been no comprehensive analysis of the benefits of COM. As a result of focus on the benefits of implementation of these concepts and evaluating the effect of each of these strategies and benefits, from different perspectives during various time periods, managers can increase project efficiency and productivity, and improve their performance, through using concepts and strategies of their implementation. This research aims to evaluate the trend of studies on the benefits of implementing constructability, operability, and maintainability in the construction industry. For that, the in-depth literature review method is applied. For qualitative analysis of the obtained information, descriptive analysis has been used. Then, the data was coded, and classified using Excel Software for quantitative data analysis. Finally, the charts presented were evaluated according to the classified fields of study. The necessity of performing such a study is significant because of the fact that a large share of a project’s problems, such as lack of plans’ integration and weakness of administrative system, and increasing time and cost, are due to

  3. Remotely operated excavator needs assessment/site visit summary

    Energy Technology Data Exchange (ETDEWEB)

    Straub, J.; Haller, S.; Worsley, R. [Westinghouse Environmental Management Co. of Ohio, Cincinnati, OH (United States); King, M. [THETA Technology Inc. (United States)

    1992-12-02

    The Uranium in Soils Integrated Demonstration requested an assessment of soil excavation needs relative to soil remediation. The following list identifies the DOE sites assessed: Mound Laboratory, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant, Nevada Test Site, Lawrence Livermore National Laboratory, Rocky Flats Plant, Los Alamos National Laboratory, Sandia National Laboratory, Idaho National Engineering Laboratory, Hanford Site, and Fernald Site. The reviewed sites fall into one or more of the following three categories: production, EPA National Priorities List, or CERCLA (superfund) designation. Only three of the sites appear to have the need for a remotely operated excavator rope. Hanford and Idaho Falls have areas of high-level radioactive contamination either buried or in/under buildings. The Fernald site has a need for remote operated equipment of different types. It is their feeling that remote equipment can be used to remove the health dangers to humans by removing them from the area. Most interviewees stated that characterization technologies needs are more immediate concern over excavation. In addition, the sites do not have similar geographic conditions which would aid in the development of a generic precision excavator. The sites visited were not ready to utilize or provide the required design information necessary to draft a performance specification. This creates a strong case against the development of one type of ROPE for use at these sites. Assuming soil characterization technology/methodology is improved sufficiently to allow accurate and real time field characterization then development of a precision excavator might be pursued based on FEMP needs, since the FEMP`s sole scope of work is remediation. The excavator could then be used/tested and then later modified for other sites as warranted.

  4. Project Guarantee 1985. Repository for low- and intermediate-level radioactive waste: construction and operation

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    A constructional engineering project study aimed at clarification of the feasibility of a repository for low- and intermediate-level radioactive waste (type B repository) has been carried out; the study is based on a model data-set derived from the geological, rock mechanical and topographical characterictics of one of Nagra's planned exploration areas. Final storage is effected in subterranean rock caverns accessed by horizontal tunnel. The reception area also is sited below the surface. Storage is conceived in such a way that, after closure of the repository, maintenance and supervision can be dispensed with and a guarantee of high long-term safety can nevertheless be provided. The envisaged repository consists of an entry tunnel for road vehicles and a reception area with a series of caverns for receiving waste, for additional technical facilities and for the production of the concrete back-fill material. The connecting tunnel is serviced by a tunnel railway and the actual repository area consists of several storage caverns. The repository is intended to accomodate a total of 200'000 m3 of solidified low- and intermediate-level waste. Valanginian marl is assumed as the host rock, although it would also be basically possible to house the proposed installations in other host rocks. The excavated material will total around 1'000'000 m3. The construction time for the whole installation is estimated as about 7 years and a working team of around 30 people will be required for the estimated 60-year operational duration. The project described in the present report justifies the conclusion that construction of a repository for low-and intermediate-level radioactive waste is feasible with present-day technology. This conclusion takes into consideration quantitative and operational constraints as well as geological and hydrogeological data relevant to constructional engineering. The latter are derived from a model data-set based on a specific locality

  5. Knowledge based expert system to minimise environmental pollution in Malaysian construction sites

    Energy Technology Data Exchange (ETDEWEB)

    Al-Hadu, Ibrahiem Abdul Razak; Sidek, Lariyah Mohd; Desa, Mohamad Nor Mohamad [Civil Engineering, Universiti Tenaga Nasional, Kajang, Selangor (Malaysia); Basri, Noor Ezlin Ahmad [Civil Engineering, Universiti Tenaga Nasional, Kajang, Selangor (Malaysia)

    2011-07-01

    Construction activities generate enormous amount of erosion and sediments sediments that is the result of soil disturbance during construction activities, thus, will pollute the adjacent water bodies and make it unfeasible for different uses. This paper aimed to develop and create the main features of an expert system prototype (ESCES) for minimising erosion and sedimentation due to stormwater generated from the construction activities by recommending a feasible BMPs. Multi criteria Analysis (MCA) technique has been integrated so as to select the best control measure among many stormwater control alternatives. A questionnaire has been distributed to the relevant experts so as to rank the stormwater control measures to be used in the MCA technique. Using Visual Basic 6, Graphical User Interfaces (GUIs) were developed. The knowledge and experience were acquired from various textural sources (i.e. guidelines, manuals, literature, and human expert). Results from this study showed that the Best Management Practices (BMPs) reommended have good suited the site characteristics. As a conclusion from this study, the ESCES can be considered as part of the 'Green Technology Tool' since it helps in protecting the environment and preserve good quality of water adjacent to the construction sites in Malaysia.

  6. Study on evaluation of construction reliability for engineering project based on fuzzy language operator

    Science.gov (United States)

    Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping

    2018-03-01

    System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.

  7. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Scott, D.E.; Pechmann, J.H.K.; Knox, J.N.; Estes, R.A.; McGregor, J.H.; Bailey, K. (ed.)

    1988-12-01

    The Savannah River Ecology Laboratory has completed 10 years of ecological studies related to the construction of the Defense Waste Processing Facility (DWPF) on the Savannah River Site. This progress report examines water quality studies on streams peripheral to the DWPF construction site and examines the effectiveness of refuge ponds'' in ameliorating the effects of construction on local amphibians. Individual papers on these topics are indexed separately. 93 refs., 15 figs., 15 tabs. (MHB)

  8. A new algorithm for construction of coarse-grained sites of large biomolecules.

    Science.gov (United States)

    Li, Min; Zhang, John Z H; Xia, Fei

    2016-04-05

    The development of coarse-grained (CG) models for large biomolecules remains a challenge in multiscale simulations, including a rigorous definition of CG representations for them. In this work, we proposed a new stepwise optimization imposed with the boundary-constraint (SOBC) algorithm to construct the CG sites of large biomolecules, based on the s cheme of essential dynamics CG. By means of SOBC, we can rigorously derive the CG representations of biomolecules with less computational cost. The SOBC is particularly efficient for the CG definition of large systems with thousands of residues. The resulted CG sites can be parameterized as a CG model using the normal mode analysis based fluctuation matching method. Through normal mode analysis, the obtained modes of CG model can accurately reflect the functionally related slow motions of biomolecules. The SOBC algorithm can be used for the construction of CG sites of large biomolecules such as F-actin and for the study of mechanical properties of biomaterials. © 2015 Wiley Periodicals, Inc.

  9. Regulatory aspects of construction and operation in Switzerland

    International Nuclear Information System (INIS)

    Hugi, Markus

    2014-01-01

    The regulatory mission with respect to radioactive waste disposal in Switzerland consists of the following tasks: to assess proposed solutions and supervise the preparation for geological disposal of radioactive waste, to review the licence applications in accord with the stepwise implementation process; to supervise the transport of radioactive material to and from nuclear installations; to supervise surface facilities and underground installations of deep geological repositories; and to supervise the safety of staff and the public and their protection from radiation. Related nuclear legislation consists of the Nuclear Energy Act, the Radiological Protection Act including the corresponding Ordinances, and the Ordinance on the Decommissioning Fund and the Waste Disposal Fund for Nuclear Installations. Design, construction and operating principles for DGRs and requirements for the safety case have been developed recently by the Swiss regulatory body. The corresponding guideline specifies protection objectives, protection criteria and specific requirements for DGRs, defines the procedure to be followed for demonstrating the safety of a geological repository, and identifies requirements for the operation of facilities and for their closure. The Nuclear Energy Act stipulates a series of licences that must be obtained prior to completion of a DGR - starting with a general licence, followed by the licences for construction and operation, and finally the closure order

  10. Issues related to the construction and operation of a geological disposal facility for nuclear fuel waste in crystalline rock - the Canadian experience

    Energy Technology Data Exchange (ETDEWEB)

    Allan, C.J.; Baumgartner, P.; Ohta, M.M.; Simmons, G.R.; Whitaker, S.H. [Atomic Energy of Canada Ltd., Pinawa, MB (Canada). Whiteshell Labs

    1997-12-31

    This paper covers the overview of the Canadian nuclear fuel waste management program, the general approach to the siting, design, construction, operation and closure of a geological disposal facility, the implementing disposal, and the public involvement in implementing geological disposal of nuclear fuel waste. And two appendices are included. 45 refs., 5 tabs., 10 figs.

  11. Issues related to the construction and operation of a geological disposal facility for nuclear fuel waste in crystalline rock - the Canadian experience

    International Nuclear Information System (INIS)

    Allan, C.J.; Baumgartner, P.; Ohta, M.M.; Simmons, G.R.; Whitaker, S.H.

    1997-01-01

    This paper covers the overview of the Canadian nuclear fuel waste management program, the general approach to the siting, design, construction, operation and closure of a geological disposal facility, the implementing disposal, and the public involvement in implementing geological disposal of nuclear fuel waste. And two appendices are included. 45 refs., 5 tabs., 10 figs

  12. Supplement to Final Environmental Statement related to construction and operation of Clinch River Breeder Reactor Plant, Docket No. 50-537

    International Nuclear Information System (INIS)

    1982-10-01

    In February 1977, the Office of Nuclear Reactor Regulation issued a Final Environmental Statement (FES) (NUREG-0139) related to the construction and operation of the proposed Clinch River Breeder Reactor Plant (CRBRP). Since the FES was issued, additional data relative to the site and its environs have been collected, several modifications have been made to the CRBRP design, and its fuel cycle, and the timing of the plant construction and operation has been affected in accordance with deferments under the DOE Liquid Metal Fast Breeder Reactor (LMFBR) program. These changes are summarized and their environmental significance is assessed in this document. The reader should note that this document generally does not repeat the substantial amount of information in the FES which is still current; hence, the FES should be consulted for a comprehensive understanding of the staff's environmental review of the CRBRP project

  13. Robust Segmentation of Planar and Linear Features of Terrestrial Laser Scanner Point Clouds Acquired from Construction Sites

    Science.gov (United States)

    Maalek, Reza; Lichti, Derek D; Ruwanpura, Janaka Y

    2018-01-01

    Automated segmentation of planar and linear features of point clouds acquired from construction sites is essential for the automatic extraction of building construction elements such as columns, beams and slabs. However, many planar and linear segmentation methods use scene-dependent similarity thresholds that may not provide generalizable solutions for all environments. In addition, outliers exist in construction site point clouds due to data artefacts caused by moving objects, occlusions and dust. To address these concerns, a novel method for robust classification and segmentation of planar and linear features is proposed. First, coplanar and collinear points are classified through a robust principal components analysis procedure. The classified points are then grouped using a new robust clustering method, the robust complete linkage method. A robust method is also proposed to extract the points of flat-slab floors and/or ceilings independent of the aforementioned stages to improve computational efficiency. The applicability of the proposed method is evaluated in eight datasets acquired from a complex laboratory environment and two construction sites at the University of Calgary. The precision, recall, and accuracy of the segmentation at both construction sites were 96.8%, 97.7% and 95%, respectively. These results demonstrate the suitability of the proposed method for robust segmentation of planar and linear features of contaminated datasets, such as those collected from construction sites. PMID:29518062

  14. Construction of hexahedral elements mesh capturing realistic geometries of Bayou Choctaw SPR site

    Energy Technology Data Exchange (ETDEWEB)

    Park, Byoung Yoon [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Roberts, Barry L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-09-01

    The three-dimensional finite element mesh capturing realistic geometries of Bayou Choctaw site has been constructed using the sonar and seismic survey data obtained from the field. The mesh is consisting of hexahedral elements because the salt constitutive model is coded using hexahedral elements. Various ideas and techniques to construct finite element mesh capturing artificially and naturally formed geometries are provided. The techniques to reduce the number of elements as much as possible to save on computer run time with maintaining the computational accuracy is also introduced. The steps and methodologies could be applied to construct the meshes of Big Hill, Bryan Mound, and West Hackberry strategic petroleum reserve sites. The methodology could be applied to the complicated shape masses for not only various civil and geological structures but also biological applications such as artificial limbs.

  15. Pyramiding tumuli waste disposal site and method of construction thereof

    Science.gov (United States)

    Golden, Martin P.

    1989-01-01

    An improved waste disposal site for the above-ground disposal of low-level nuclear waste as disclosed herein. The disposal site is formed from at least three individual waste-containing tumuli, wherein each tumuli includes a central raised portion bordered by a sloping side portion. Two of the tumuli are constructed at ground level with adjoining side portions, and a third above-ground tumulus is constructed over the mutually adjoining side portions of the ground-level tumuli. Both the floor and the roof of each tumulus includes a layer of water-shedding material such as compacted clay, and the clay layer in the roofs of the two ground-level tumuli form the compacted clay layer of the floor of the third above-ground tumulus. Each tumulus further includes a shield wall, preferably formed from a solid array of low-level handleable nuclear wate packages. The provision of such a shield wall protects workers from potentially harmful radiation when higher-level, non-handleable packages of nuclear waste are stacked in the center of the tumulus.

  16. Climatic and psychosocial risks of heat illness incidents on construction site.

    Science.gov (United States)

    Jia, Yunyan Andrea; Rowlinson, Steve; Ciccarelli, Marina

    2016-03-01

    The study presented in this paper aims to identify prominent risks leading to heat illness in summer among construction workers that can be prioritised for developing effective interventions. Samples are 216 construction workers' cases at the individual level and 26 construction projects cases at the organisation level. A grounded theory is generated to define the climatic heat and psychosocial risks and the relationships between risks, timing and effectiveness of interventions. The theoretical framework is then used to guide content analysis of 36 individual onsite heat illness cases to identify prominent risks. The results suggest that heat stress risks on construction site are socially constructed and can be effectively managed through elimination at supply chain level, effective engineering control, proactive control of the risks through individual interventions and reactive control through mindful recognition and response to early symptoms. The role of management infrastructure as a base for effective interventions is discussed. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  17. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    International Nuclear Information System (INIS)

    2010-01-01

    for the Disposal of Low-Level Waste with Regulated Asbestos Waste.'' A requirement of the authorization was that on or before October 9, 1999, a permit was required to be issued. Because of NDEP and NNSA/NSO review cycles, the final permit was issued on April 5, 2000, for the operation of the Area 5 Low-Level Waste Disposal Site, utilizing Pit 7 (P07) as the designated disposal cell. The original permit applied only to Pit 7, with a total design capacity of 5,831 cubic yards (yd 3 ) (157,437 cubic feet (ft 3 )). NNSA/NSO is expanding the SWDS to include the adjacent Upper Cell of Pit 6 (P06), with an additional capacity of 28,037 yd 3 (756,999 ft 3 ) (Figure 3). The proposed total capacity of ALLW in Pit 7 and P06 will be approximately 33,870 yd 3 (0.9 million ft 3 ). The site will be used for the disposal of regulated ALLW, small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. The only waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM). The term asbestiform is used throughout this document to describe this waste. Other TSCA waste (i.e., polychlorinated biphenyls (PCBs)) will not be accepted for disposal at the SWDS. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with

  18. Using game technologies to improve the safety of construction plant operations.

    Science.gov (United States)

    Guo, Hongling; Li, Heng; Chan, Greg; Skitmore, Martin

    2012-09-01

    Many accidents occur world-wide in the use of construction plant and equipment, and safety training is considered by many to be one of the best approaches to their prevention. However, current safety training methods/tools are unable to provide trainees with the hands-on practice needed. Game technology-based safety training platforms have the potential to overcome this problem in a virtual environment. One such platform is described in this paper - its characteristics are analysed and its possible contribution to safety training identified. This is developed and tested by means of a case study involving three major pieces of construction plant, which successfully demonstrates that the platform can improve the process and performance of the safety training involved in their operation. This research not only presents a new and useful solution to the safety training of construction operations, but illustrates the potential use of advanced technologies in solving construction industry problems in general. Copyright © 2011 Elsevier Ltd. All rights reserved.

  19. Japanese site for ITER: Rokkasho

    International Nuclear Information System (INIS)

    Kishimoto, Hiroshi

    2003-01-01

    This paper describes the status of Japanese efforts for hosting ITER in Japan. In May 2002, Japanese Government decided to propose an ITER site, Rokkasho in Aomori Prefecture, a Northern part of the main island, based on the comprehensive/intensive assessments by the Site Selection Committee established by Japanese Government. ITER is designed basically with a potential flexibility beyond the detailed technical objectives to have more clear scope for developing technical key elements in a future power plant. Various flexibilities in the construction, operation and decommissioning of ITER are totally assessed. Consequently the Japanese site has been chosen and it satisfies sufficiently not only the Site Requirements and the Site Design Assumptions but also the further extension and flexibilities. In particular the potential for more flexible construction schedule and operations is technically described as well as the fulfillment of the site requirements and its assumptions as the minimum requirements in this paper. The socio-cultural environment is also described briefly because of a key aspect for the scientists and engineers who will participate in the project

  20. The Discursive Construction of Teachers’ Desirable Identity on a Social Networking Site

    Directory of Open Access Journals (Sweden)

    Radzuwan Ab Rashid

    2016-09-01

    Full Text Available This study is situated in the broader identity-construction literature. Bringing discourse community theory to examine teachers’ postings on Facebook Timelines, we explored how teachers discursively construct socially desirable identities to fit into the Timeline community. Data were gathered from the Status updates and Comments on 29 Timelines belonged to Malaysian English language teachers who were purposively chosen as they often posted and commented on teaching-related issues on their Timelines. The analysis shows that the commonest form of identity construction on the teachers’ Timelines was as an engager which had been carefully constructed to portray positive self-image. This paper concludes that when participating on a public networking site, the teachers were being strategic as not to construct identities which could tarnish their professional image.

  1. Virtual Prototyping for Construction Site Co2 Emissions and Hazard Detection

    Directory of Open Access Journals (Sweden)

    Johnny Kwok Wai Wong

    2014-08-01

    Full Text Available The need for an efficient means of managing emissions and identifying potential hazard black spots in construction processes effectively and at the lowest cost possible has been highlighted in the construction sector. This study illustrates an integrated 5D model developed for quantifying carbon emissions and simulating the pattern of emissions of construction processes as a whole using virtual prototyping technologies. The predicted construction emissions data for each activity is generated and plotted to visually demonstrate the emission rates alongside the integrated four-dimensional VP framework of the construction project. The model also consists of a pro-active construction management system (PCMS, which assist the project team to detect sources of danger to on-site workers and provide pro-active warnings to them so as to avoid fatal accidents that are often caused by falling from heights and being struck by moving objects. A Hong Kong high-rise housing development project is used to exhibit the application of the carbon emission visualisation and potential accident detection system. This tool aims to encourage construction industry practitioners to become more environmentally conscious and pro-active in carbon mitigation and safety performance.

  2. Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Potable Water System Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ocampo, Ruben P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bellah, Wendy [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-03-04

    The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well water is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.

  3. Surgical Site Infections and Associated Operative Characteristics.

    Science.gov (United States)

    Waltz, Paul K; Zuckerbraun, Brian S

    Surgical site infection (SSI) contributes significantly to surgical morbidity. Patient factors and operative factors contribute to the risk of development of SSI. This review focuses on understanding operative characteristics that are associated with an increased risk of SSI. Much attention has been given to protocol care to reduce SSI, such as hair removal, skin preparation, and pre-operative antibiotic agents. Even with this, the appropriate antibiotic and re-dosing regimens often remain a challenge. Other operative factors such as blood loss/transfusion, emergency/urgent cases, duration of the operation, type of anesthesia, and resident involvement are also potentially modifiable to reduce the risk of SSI. Data are reviewed to highlight the increased risk associated with such factors. Strategies to reduce risk, such as operative care bundles, have significant promise to reduce the incidence of SSI for any given procedure.

  4. Prevalence and correlates of nicotine dependence among construction site workers: A cross-sectional study in Delhi

    Directory of Open Access Journals (Sweden)

    Mamta Parashar

    2016-01-01

    Full Text Available Introduction: Workers represent half the world′s population and are major contributors to economic and social development. Tobacco consumption in construction site workers has been considered a big challenge. Objectives: (1 To assess the prevalence of nicotine dependence among tobacco users. (2 To study the correlates of nicotine dependence among the construction site workers. Methodology: A cross sectional study was conducted using a predesigned and pretested structured proforma. The study was conducted among all construction site workers aged 18yrs and above in campus of Hamdard Institute of Medical Sciences and Research and associated HAH centenary hospital, New Delhi.Karl Fagerstrom Nicotine Dependence Questionnaire was used to assess dependence on nicotine. Results: The mean age of construction site workers was 32.04±11.6 years. Among the workers, majority (91% were tobacco user. Among the users, 60% found it difficult to refrain from smoking/chewing in places where use of tobacco is not allowed (e.g. hospitals, government offices, cinemas, Libraries etc. 55% of the users smoked or chewed tobacco during the first hours after waking than during the rest of the day. On multivariate analysis, the factors which were found to be significantly associated with nicotine dependence were lower income group (OR 2.57, CI:1.66-3.99, smokeless tobacco use (OR 2.36,CI:1.30-4.27 and lower education (OR = 2.86 (95% CI 1.97-4.16 for illiterate. Discussion: The prevalence of tobacco use (91% among construction workers is very high compared to that in the general population. Recognition of construction sites as work places and proper implementation of law is needed.

  5. Biogas plants: Design, construction and operation

    International Nuclear Information System (INIS)

    2001-01-01

    At the big readiness of waste coming from the agricultural activities are looked for the production of Energy and Payments, the biogas like product of the organic decomposition under anaerobic conditions, their composition and characteristic. The elements that conform the design as the digester, the storage, the load tanks and it discharges and the conduction is described and analyzed. They are given a series of elements to obtain the characteristics of the system possible to place as: planning, calculations, evaluation, execution and operation. Lastly the steps are indicated that should be continued in the construction of the plant including planning for the work

  6. Application for Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site - U10c Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Programs

    2010-08-05

    The NTS is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. NNSA/NSO is the federal lands management authority for the NTS and NSTec is the Management & Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The U10C Disposal Site is located in the northwest corner of Area 9 at the NTS (Figure 1) and is located in a subsidence crater created by two underground nuclear events, one in October 1962 and another in April 1964. The disposal site opened in 1971 for the disposal of rubbish, refuse, pathological waste, asbestos-containing material, and industrial solid waste. A Notice of Intent form to operate the disposal site as a Class II site was submitted to the state of Nevada on January 26, 1994, and was acknowledged in a letter to the DOE on February 8, 1994. It operated as a state of Nevada Class II Solid Waste Disposal Site (SWDS) until it closed on October 5, 1995, for retrofit as a Class III SWDS. The retrofit consisted of the installation of a minimum four-foot compacted soil layer to segregate the different waste types and function as a liner to inhibit leachate and water flow into the lower waste zone. Five neutron monitoring tubes were installed in this layer to monitor possible leachate production and water activity. Upon acceptance of the installed barrier and approval of an Operating Plan by NDEP/BFF, the site reopened in January 1996 as a Class III SWDS for the disposal of industrial solid waste and other inert waste.

  7. Operational readiness review of the Low Level Waste vaults at Savannah River Site: A case study

    International Nuclear Information System (INIS)

    Ahmad, M.; McVay, C.; Venkatesh, S.

    1994-01-01

    Low Level radioactive Waste (LLW) at the Savannah River Site at Aiken, South Carolina, has traditionally been disposed of using engineered trenches in accordance with the guidelines and technology existing at the time. Recently, subgrade concrete vaults known as E-Area Vaults (EAV) have been constructed at SRS. The EAV project is a comprehensive effort for upgrading LLW disposal at SRS based on meeting the requirements of current Department of Energy (DOE) Orders, and addressing more stringent federal and state regulations. The EAV is a first of its kind state-of-the-art facility designed and built in the United States to receive LLW. Westinghouse Savannah River Company (WSRC) conducted an Operational Readiness Review (ORR) of the vaults prior to startup. The objective of the EAV ORR was to perform a comprehensive review of the operational readiness of the facilities per DOE guidelines including Defense Nuclear Facilities Safety Board (DNFSB) recommendations. This review included assessing construction of the vaults as per design, adequate approved procedures, and training of all the personnel associated with the facility operations. EAV ORR incorporated the lessons learned from other DOE ORRs, included DNFSB recommendations, used a graded approach, and utilized subject matter experts for each functional area of assessment

  8. Energy benchmarking in wastewater treatment plants: the importance of site operation and layout.

    Science.gov (United States)

    Belloir, C; Stanford, C; Soares, A

    2015-01-01

    Energy benchmarking is a powerful tool in the optimization of wastewater treatment plants (WWTPs) in helping to reduce costs and greenhouse gas emissions. Traditionally, energy benchmarking methods focused solely on reporting electricity consumption, however, recent developments in this area have led to the inclusion of other types of energy, including electrical, manual, chemical and mechanical consumptions that can be expressed in kWh/m3. In this study, two full-scale WWTPs were benchmarked, both incorporated preliminary, secondary (oxidation ditch) and tertiary treatment processes, Site 1 also had an additional primary treatment step. The results indicated that Site 1 required 2.32 kWh/m3 against 0.98 kWh/m3 for Site 2. Aeration presented the highest energy consumption for both sites with 2.08 kWh/m3 required for Site 1 and 0.91 kWh/m3 in Site 2. The mechanical energy represented the second biggest consumption for Site 1 (9%, 0.212 kWh/m3) and chemical input was significant in Site 2 (4.1%, 0.026 kWh/m3). The analysis of the results indicated that Site 2 could be optimized by constructing a primary settling tank that would reduce the biochemical oxygen demand, total suspended solids and NH4 loads to the oxidation ditch by 55%, 75% and 12%, respectively, and at the same time reduce the aeration requirements by 49%. This study demonstrated that the effectiveness of the energy benchmarking exercise in identifying the highest energy-consuming assets, nevertheless it points out the need to develop a holistic overview of the WWTP and the need to include parameters such as effluent quality, site operation and plant layout to allow adequate benchmarking.

  9. Quantifying and modeling soil erosion and sediment export from construction sites in southern California

    Science.gov (United States)

    Wernet, A. K.; Beighley, R. E.

    2006-12-01

    Soil erosion is a power process that continuously alters the Earth's landscape. Human activities, such as construction and agricultural practices, and natural events, such as forest fires and landslides, disturb the landscape and intensify erosion processes leading to sudden increases in runoff sediment concentrations and degraded stream water quality. Understanding soil erosion and sediment transport processes is of great importance to researchers and practicing engineers, who routinely use models to predict soil erosion and sediment movement for varied land use and climate change scenarios. However, existing erosion models are limited in their applicability to constructions sites which have highly variable soil conditions (density, moisture, surface roughness, and best management practices) that change often in both space and time. The goal of this research is to improve the understanding, predictive capabilities and integration of treatment methodologies for controlling soil erosion and sediment export from construction sites. This research combines modeling with field monitoring and laboratory experiments to quantify: (a) spatial and temporal distribution of soil conditions on construction sites, (b) soil erosion due to event rainfall, and (c) potential offsite discharge of sediment with and without treatment practices. Field sites in southern California were selected to monitor the effects of common construction activities (ex., cut/fill, grading, foundations, roads) on soil conditions and sediment discharge. Laboratory experiments were performed in the Soil Erosion Research Laboratory (SERL), part of the Civil and Environmental Engineering department at San Diego State University, to quantify the impact of individual factors leading to sediment export. SERL experiments utilize a 3-m by 10-m tilting soil bed with soil depths up to 1 m, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). Preliminary modeling, field and laboratory

  10. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3-70). Volume 2, Public comments and NRC response

    International Nuclear Information System (INIS)

    Zeitoun, A.

    1994-08-01

    The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF 6 , using a proven centrifuge technology. Included in the assessment are co on, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility

  11. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3-70). Volume 2, Public comments and NRC response

    Energy Technology Data Exchange (ETDEWEB)

    Zeitoun, A. [Science Applications International Corp., Germantown, MD (United States)

    1994-08-01

    The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are co on, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility.

  12. The importance of cleanliness in a proper construction site management in malaysia: a contractor’s perspective

    Science.gov (United States)

    Shazwan, M. A.; Quintin, J. V.; Osman, N. A.; Suhaida, S. K.; Ma'arof, M. I. N.

    2017-11-01

    Construction site’s cleanliness and tidiness is one of top main concerns of construction site management. A good site management with adequate planning in regards to housekeeping will ensure safety to both the site’s working personnel and the neighbouring environment. This is especially of priority today due to the rapid growth of construction projects in Malaysia. Nevertheless, to date, statistics had shown that housekeeping related accidents happened repeatedly despite the awareness on site’s cleanliness and tidiness. The objective of this study was to explore constructor’s perspective on site cleanliness and tidiness. A set of questionnaire was distributed to thirty-four (34) Grade 7 CIDB contractors’ firms in Petaling Jaya. Petaling Jaya was chosen since this area are developed area covered with residential area and cleaning management an importance issues. The goals of the survey study were to identify the following items from the perception of the contractors: (i) the hierarchy of importance of several purposes in ensuring construction site’s cleanliness and tidiness, and (ii) the risk factors that influence a construction site’s level of cleanliness and tidiness. It was found that from the contractor’s perspective, ensuring a site cleanliness and tidiness is of importance mainly due to the need in protecting the environment, whilst, the least in cost saving. In addition, poor personnel’s working attitude was found to be the main risk factor that will influences a construction site’s level of cleanliness and tidiness. Conclusively, construction site’s cleanliness and tidiness is highly vital. Even so, for nationwide awareness on the topic matter will requires full cooperation from all related parties.

  13. Factors influencing unsafe behaviors and accidents on construction sites: a review.

    Science.gov (United States)

    Khosravi, Yahya; Asilian-Mahabadi, Hassan; Hajizadeh, Ebrahim; Hassanzadeh-Rangi, Narmin; Bastani, Hamid; Behzadan, Amir H

    2014-01-01

    Construction is a hazardous occupation due to the unique nature of activities involved and the repetitiveness of several field behaviors. The aim of this methodological and theoretical review is to explore the empirical factors influencing unsafe behaviors and accidents on construction sites. In this work, results and findings from 56 related previous studies were investigated. These studies were categorized based on their design, type, methods of data collection, analytical methods, variables, and key findings. A qualitative content analysis procedure was used to extract variables, themes, and factors. In addition, all studies were reviewed to determine the quality rating and to evaluate the strength of provided evidence. The content analysis identified 8 main categories: (a) society, (b) organization, (c) project management, (d) supervision, (e) contractor, (f) site condition, (g) work group, and (h) individual characteristics. The review highlighted the importance of more distal factors, e.g., society and organization, and project management, that may contribute to reducing the likelihood of unsafe behaviors and accidents through the promotion of site condition and individual features (as proximal factors). Further research is necessary to provide a better understanding of the links between unsafe behavior theories and empirical findings, challenge theoretical assumptions, develop new applied theories, and make stronger recommendations.

  14. Constructing Optimal Coarse-Grained Sites of Huge Biomolecules by Fluctuation Maximization.

    Science.gov (United States)

    Li, Min; Zhang, John Zenghui; Xia, Fei

    2016-04-12

    Coarse-grained (CG) models are valuable tools for the study of functions of large biomolecules on large length and time scales. The definition of CG representations for huge biomolecules is always a formidable challenge. In this work, we propose a new method called fluctuation maximization coarse-graining (FM-CG) to construct the CG sites of biomolecules. The defined residual in FM-CG converges to a maximal value as the number of CG sites increases, allowing an optimal CG model to be rigorously defined on the basis of the maximum. More importantly, we developed a robust algorithm called stepwise local iterative optimization (SLIO) to accelerate the process of coarse-graining large biomolecules. By means of the efficient SLIO algorithm, the computational cost of coarse-graining large biomolecules is reduced to within the time scale of seconds, which is far lower than that of conventional simulated annealing. The coarse-graining of two huge systems, chaperonin GroEL and lengsin, indicates that our new methods can coarse-grain huge biomolecular systems with up to 10,000 residues within the time scale of minutes. The further parametrization of CG sites derived from FM-CG allows us to construct the corresponding CG models for studies of the functions of huge biomolecular systems.

  15. Sites of Memory and the Construction of Democracy: Spain and Chile

    Directory of Open Access Journals (Sweden)

    Maria Chiara Bianchini

    2014-11-01

    Full Text Available This article compares the histories of two sites of memory located in the capital cities of Spain and Chile. Both sites are considered outstanding symbols of the last military dictatorship and their evolution over the past decade reflects the difficult construction of public discourses on dictatorial violence. Both processes take place at the end of two transitions to democracies that have followed similar patterns and have interacted with each other in many ways. Still, these two societies have handled very differently the dictatorial past and its representations.

  16. AN ASSESSMENT OF FACTORS AFFECTING MATERIAL STOCK CONTROL PRACTICE ON SELECTED CONSTRUCTION SITES IN NIGERIA

    OpenAIRE

    Adafin, Johnson Kayode; Ayodele, Elijah Olusegun; Daramola, Olufemi

    2011-01-01

    This research examines the stock control methods utilized by construction firms on construction sites with a view to assessing the factors affecting material stock control practice by construction firms as well as determining the impact of factors affecting material stock control on building project performance. Data were collected with the aid of well-structured questionnaire administered on a number of construction professionals and technicians in some randomly selected building constructio...

  17. Status report: Fernald site remediation

    International Nuclear Information System (INIS)

    Craig, J.R. Jr.; Saric, J.A.; Schneider, T.; Yates, M.K.

    1995-01-01

    The Fernald site is rapidly transitioning from a Remedial Investigation/ Feasibility Study (RI/FS) site to one where design and construction of the remedies dominates. Fernald is one of the first sites in the Department of Energy (DOE) complex to accomplish this task and real physical progress is being made in moving the five operable units through the CERCLA process. Two of the required Records of Decision (ROD) are in hand and all five operable units will have received their RODs (IROD for OU3) by the end of 1995. Pre-design investigations, design work or construction are now in progress on the operable units. The lessons learned from the work done to date include implementing innovations in the RI and FS process as well as effective use of Removal Actions to begin the actual site remediation. Also, forging close working relationships with the Federal and State Regulators, citizens action groups and the Fernald Citizens Task Force has helped move the program forward. The Fernald successes have been achieved by close coordination and cooperation among all groups working on the projects and by application of innovative technologies within the decision making process

  18. Marketing Research of Construction Sites based on ABC-XYZ Analysis and Relational Data

    Directory of Open Access Journals (Sweden)

    Konikov Aleksandr

    2017-01-01

    Full Text Available ABC-XYZ analysis is well known in marketing. It allows identifying sites that yield maximum profits when sold, sites that enjoy stable demand, or sites have both qualities specified above. However, the methods are quite abstract and are not designed to study specific factors that impact the results of ABC-XYZ analysis. Meanwhile, for some applications, particularly for marketing research of construction sites, it is critical not only to identify high-profit and stable sites but also to find out what combination of technical parameters, factors related to their location, transport accessibility, etc. are typical of them. This work suggests an approach to address the issue.

  19. Review Team Focused Modeling Analysis of Radial Collector Well Operation on the Hypersaline Groundwater Plume beneath the Turkey Point Site near Homestead, Florida

    International Nuclear Information System (INIS)

    Oostrom, Martinus; Vail, Lance W.

    2016-01-01

    Researchers at Pacific Northwest National Laboratory served as members of a U.S. Nuclear Regulatory Commission review team for the Florida Power & Light Company's application for two combined construction permits and operating licenses (combined licenses or COLs) for two proposed new reactor units-Turkey Point Units 6 and 7. The review team evaluated the environmental impacts of the proposed action based on the October 29, 2014 revision of the COL application, including the Environmental Report, responses to requests for additional information, and supplemental information. As part of this effort, team members tasked with assessing the environmental effects of proposed construction and operation of Units 6 and 7 at the Turkey Point site reviewed two separate modeling studies that analyzed the interaction between surface water and groundwater that would be altered by the operation of radial collector wells (RCWs) at the site. To further confirm their understanding of the groundwater hydrodynamics and to consider whether certain actions, proposed after the two earlier modeling studies were completed, would alter the earlier conclusions documented by the review team in their draft environmental impact statement (EIS; NRC 2015), a third modeling analysis was performed. The third modeling analysis is discussed in this report.

  20. The safeguards on-site laboratory at Sellafield. Five years operational experience

    Energy Technology Data Exchange (ETDEWEB)

    Duinslaeger, L.; Belle, P. van; Mayer, K.; Casteleyn, K.; Abousahl, S.; Daures, P.; Eberle, H.; Enright, T.; Guiot, A.; Hild, M.; Horta Domenech, J.; Lajarge, P.; Laurent, P.; Le Terrier, A.; Lynch, B.; Marucci, M.; Millet, S.; Ottmar, H.; Richir, P.; Street, S.; Vallet, P.; Zuleger, E. [European Commission, Karlsruhe (Germany). Inst. for Transuranium Elements

    2004-06-01

    The start of operation of the large reprocessing facilities led Euratom Safeguards to a new approach for verification analysis of samples taken at the facility: the installation of on-site laboratories. The availability of analytical capabilities for independent verification measurements at the site of these facilities offers obvious advantages in view of timeliness of results. The 'On-Site Laboratory' (OSL) at the BNFL Sellafield site was the first ever and entered into operation in 1999. For almost five years, the Institute for Transuranium Elements (ITU) has been operating the laboratory under routine conditions. During this period, more than one thousand safeguards samples were analysed. The experience gained in the management, logistics and operation of the OSL allow a critical review based on a significant period in time. This includes also aspects of training of staff, maintenance of equipment, flow of information, and improvements in the efficiency. The analytical issues are of key importance: based on the operational experience, the measurement methods were adapted (changing boundary conditions), the distribution of samples according to material type changed (start up of MOS fabrication plant), and the cutback in resources triggered a further streamlining of the analytical efforts. (orig.)

  1. Workers’ Age and the Impact of Psychological Factors on the Perception of Safety at Construction Sites

    Directory of Open Access Journals (Sweden)

    Muhammad Dawood Idrees

    2017-05-01

    Full Text Available The safety of construction workers is always a major concern at construction sites as the construction industry is inherently dangerous with many factors influencing worker safety. Several studies concluded that psychological factors such as workload, organizational relationships, mental stress, job security, and job satisfaction have significant effects on workers’ safety. However, research on psychological factors that are characteristic of different age groups have been limited. The aim of this study was to examine the impact of psychological factors on the perception of worker safety for two different age groups. After an extensive literature review, different psychological factors were identified, and a hypothetical research model was developed based on psychological factors that could affect workers’ perception of safety. A survey instrument was developed, and data were collected from seven different construction sites in Pakistan. Structural equation modeling (SEM was employed to test the hypothetical model for both age groups. The results revealed that workload and job satisfaction are significantly dominant factors on workers’ perception of safety in older workers, whereas organizational relationships, mental stress, and job security are dominant factors for younger workers at construction sites.

  2. Thermal Operating Modes

    International Nuclear Information System (INIS)

    Bechtel SAIC Company

    2002-01-01

    Higher and lower temperature operating modes (e.g., above and below the boiling point of water) are alternative approaches to managing the heat produced by the radioactive decay of spent nuclear fuel. Current analyses indicate that a repository at the Yucca Mountain site is likely to comply with applicable safety standards regardless of the particular thermal operating mode. Both modes have potential advantages and disadvantages. With a higher temperature operating mode (HTOM), waste packages (WPs) can be placed closer together. This reduces the number of drifts, the required emplacement area, construction costs, and occupational risks to construction workers. In addition, the HTOM would minimize the amount of water that might contact the waste for hundreds of years after closure. On the other hand, higher temperatures introduce uncertainties in the understanding of the long-term performance of the repository because of uncertainties in the thermal effects on WP lifetime and the near-field environment around the drifts. A lower temperature operating mode (LTOM) has the potential to reduce uncertainties in long-term performance of the repository by limiting the effects of temperature on WP lifetime and on the near-field environment around the drifts. Depending on the combination of operating parameters, a LTOM could require construction of additional drifts, a larger emplacement area, increased construction costs, increased occupational risks to construction works, and a longer period of ventilation than a HTOM. The repository design for the potential Yucca Mountain site is flexible and can be constructed and operated in various operating modes to achieve specific technical objectives, accommodate future policy decisions, and use of new information. For example, the flexible design can be operated across a range of temperatures and can be tailored to achieve specific thermal requirements in the future. To accommodate future policy decisions, the repository can be

  3. Analysis of noise on construction sites of high-rise buildings.

    Science.gov (United States)

    Barkokébas, Béda; Vasconcelos, Bianca M; Lago, Eliane Maria G; Alcoforador, Aline Fabiana P

    2012-01-01

    In the civil construction industry sector, it has been observed that the increasing use of machines has made tasks noisier and consequently caused hearing loss and had other adverse effects on workers. The objective of this study was to identify and assess the physical risks of noise present in activities undertaken in a construction company in order to propose control measures which will contribute to the management of health and safety within the company's organization. The methodology applied was based on verifying the characteristics of exposure to noise on construction sites, from an observation of sources which generated noise and making measurements of sound pressure levels emitted by these sources. The data was then analyzed and compared with the recommended performance levels established in control measures. As a result, it was found that some machines and equipment used in civil construction often generate noise above the acceptable levels and as such, in these cases, various control measures have been proposed. It is believed that the use of management techniques is the most effective way to assess risk and to implement the preventive and corrective actions proposed, and allows for the analysis of sound pressure levels on an ongoing basis.

  4. ANDRA's Centre de l'Aube: Design, construction, operation of a state of the art surface disposal facility for low and intermediate level waste

    International Nuclear Information System (INIS)

    Potier, J.M.

    2001-01-01

    The ANDRA's Centre de I'Aube disposal facility for low and intermediate level radioactive waste may be considered as a state-of-the-art repository. Since its implementation in the early nineties, the French facility has been used as a model by many countries worldwide for the surface disposal of radioactive waste. The disposal concept developed by ANDRA, the French Radioactive Waste Management Agency, consists of a multiple-barrier system designed to isolate radioactivity and provide protection to the public and to the environment. Waste operations at ANDRA's Centre de I'Aube are largely automated to ensure better protection to site workers. The paper reviews all aspects of the repository implementation: siting, design, construction, operation and future closure, and environmental monitoring. (author)

  5. Facile Site-Directed Mutagenesis of Large Constructs Using Gibson Isothermal DNA Assembly.

    Science.gov (United States)

    Yonemoto, Isaac T; Weyman, Philip D

    2017-01-01

    Site-directed mutagenesis is a commonly used molecular biology technique to manipulate biological sequences, and is especially useful for studying sequence determinants of enzyme function or designing proteins with improved activity. We describe a strategy using Gibson Isothermal DNA Assembly to perform site-directed mutagenesis on large (>~20 kbp) constructs that are outside the effective range of standard techniques such as QuikChange II (Agilent Technologies), but more reliable than traditional cloning using restriction enzymes and ligation.

  6. Operational technology for greater confinement disposal

    International Nuclear Information System (INIS)

    Dickman, P.T.; Vollmer, A.T.; Hunter, P.H.

    1984-12-01

    Procedures and methods for the design and operation of a greater confinement disposal facility using large-diameter boreholes are discussed. It is assumed that the facility would be located at an operating low-level waste disposal site and that only a small portion of the wastes received at the site would require greater confinement disposal. The document is organized into sections addressing: facility planning process; facility construction; waste loading and handling; radiological safety planning; operations procedures; and engineering cost studies. While primarily written for low-level waste management site operators and managers, a detailed economic assessment section is included that should assist planners in performing cost analyses. Economic assessments for both commercial and US government greater confinement disposal facilities are included. The estimated disposal costs range from $27 to $104 per cubic foot for a commercial facility and from $17 to $60 per cubic foot for a government facility. These costs are based on average site preparation, construction, and waste loading costs for both contact- and remote-handled wastes. 14 figures, 22 tables

  7. Enhanced On-Site Waste Management of Plasterboard in Construction Works: A Case Study in Spain

    Directory of Open Access Journals (Sweden)

    Ana Jiménez-Rivero

    2017-03-01

    Full Text Available On-site management of construction waste commonly determines its destination. In the case of plasterboard (PB, on-site segregation becomes crucial for closed-loop recycling. However, PB is commonly mixed with other wastes in Spain. In this context, the involvement of stakeholders that can contribute to reversing this current situation is needed. This paper analyzes on-site waste management of PB in Spain through a pilot study of a construction site, with the main objective of identifying best practices to increase waste prevention, waste minimization, and the recyclability of the waste. On-site visits and structured interviews were conducted. The results show five management stages: PB distribution (I; PB installation (II; Construction waste storage at the installation area (III; PB waste segregation at the installation area (IV and PB waste transfer to the PB container and storage (V. The proposed practices refer to each stage and include the merging of Stages III and IV. This measure would avoid the mixing of waste fractions in Stage III, maximizing the recyclability of PB. In addition, two requisites for achieving enhanced management are analyzed: ‘Training and commitment’ and ‘fulfilling the requirements established by the current regulation’. The results show that foremen adopted a more pessimistic attitude than installers towards a joint commitment for waste management. Moreover, not all supervisors valued the importance of a site waste management plan, regulated by the Royal Decree 105/2008 in Spain.

  8. Chiral measurements with the Fixed-Point Dirac operator and construction of chiral currents

    International Nuclear Information System (INIS)

    Hasenfratz, P.; Hauswirth, S.; Holland, K.; Joerg, T.; Niedermayer, F.

    2002-01-01

    In this preliminary study, we examine the chiral properties of the parametrized Fixed-Point Dirac operator D FP , see how to improve its chirality via the Overlap construction, measure the renormalized quark condensate Σ-circumflex and the topological susceptibility χ t , and investigate local chirality of near zero modes of the Dirac operator. We also give a general construction of chiral currents and densities for chiral lattice actions

  9. DSEM, Radioactive Waste Disposal Site Economic Model

    International Nuclear Information System (INIS)

    Smith, P.R.

    2005-01-01

    1 - Description of program or function: The Disposal Site Economic Model calculates the average generator price, or average price per cubic foot charged by a disposal facility to a waste generator, one measure of comparing the economic attractiveness of different waste disposal site and disposal technology combinations. The generator price is calculated to recover all costs necessary to develop, construct, operate, close, and care for a site through the end of the institutional care period and to provide the necessary financial returns to the site developer and lender (when used). Six alternative disposal technologies, based on either private or public financing, can be considered - shallow land disposal, intermediate depth disposal, above or below ground vaults, modular concrete canister disposal, and earth mounded concrete bunkers - based on either private or public development. 2 - Method of solution: The economic models incorporate default cost data from the Conceptual Design Report (DOE/LLW-60T, June 1987), a study by Rodgers Associates Engineering Corporation. Because all costs are in constant 1986 dollars, the figures must be modified to account for inflation. Interest during construction is either capitalized for the private developer or rolled into the loan for the public developer. All capital costs during construction are depreciated over the operation life of the site using straight-line depreciation for the private sector. 3 - Restrictions on the complexity of the problem: Maxima of - 100 years post-operating period, 30 years operating period, 15 years pre-operating period. The model should be used with caution outside the range of 1.8 to 10.5 million cubic feet of total volume. Depreciation is not recognized with public development

  10. Point-form electrodynamics and the construction of conserved current operators

    International Nuclear Information System (INIS)

    Klink, W.H.

    2003-01-01

    A general procedure for constructing conserved electromagnetic current operators in the presence of hadronic interactions is given. The four-momentum operator in point-form relativistic quantum mechanics is written as the sum of hadronic, photon, and electromagnetic four-momentum operators, where the electromagnetic four-momentum operator is generated from a vertex operator, in which a conserved current operator is contracted with the four-vector potential operator. The current operator is the sum of free, dynamically determined and model-dependent operators. The dynamically determined current operator is formed form a free current operator and the interacting hadronic four-momentum operator, in such a way that the sum of free and dynamically determined current operators is conserved with respect to the hadronic interactions. The model-dependent operator is a many-body current operator, formed as the commutator of an antisymmetric operator with the hadronic four-momentum operator. It is shown that such an operator is also conserved with respect to the hadronic interactions and also does not renormalize the charge. Refs. 9 (author)

  11. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site. FY 1989--1990 annual report

    Energy Technology Data Exchange (ETDEWEB)

    Pechmann, J.H.K.; Scott, D.E.; McGregor, J.H.; Estes, R.A.; Chazal, A.C.

    1993-02-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980`s. The Savannah River Ecology Laboratory (SREL) has completed 12 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ``refuge ponds`` as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10CFR1022).

  12. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong.

    Science.gov (United States)

    Yu, Ann T W; Poon, C S; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C&D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C&D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C&D waste. Copyright © 2012 Elsevier Ltd. All rights reserved.

  13. Usability evaluation of mobile ICT support used at the building construction site

    DEFF Research Database (Denmark)

    Christiansson, Per; Svidt, Kjeld

    2006-01-01

    The paper summarizes findings from field evaluations and controlled laboratory usability evaluations of new mobile Information and Communication Technology, ICT, support used by craftsmen at construction sites as well as a discussion of methodologies for user centred ICT tools design. The finding...

  14. Site development

    International Nuclear Information System (INIS)

    Gaynor, R.K.

    1989-01-01

    Development of a low-level radioactive waste land disposal facility is little different than any industrial development of similar scope. Consideration must be made for normal business and operations management, security, facility maintenance, traffic control and necessary amenities for personnel. The item specific to the low-level waste site is the handling of radioactive waste materials and the regulatory and environmental protection procedures that must be planned for and accomodated in the site design and development. Each of these elements and the facility as a whole must be designed to be compatible with local land use plans, available transportation and support services, and the social and economic goals of the local community. Plans should also be made for quality control and orderly construction. This chapter deals with those aspects of the facility, its design and construction which are integral parts to the overall performance of the site

  15. Development of operation control expert system for off-site facilities

    Energy Technology Data Exchange (ETDEWEB)

    Takeuchi, Masaaki

    1988-09-01

    Concerning off-site facilities of oil refinary, changes of facilities and equipment are frequently made in order to cope flexibly with the market trends and changes of the social environment. In addition, it is desirable to introduce computerization into control and manipulation of off-site facilities for its fast, safe and sure operation. In order to achieve the above, against the existing exclusively control-oriented system, it is necessary to add the processing and generating functions to combinations between valves to be shut and piping as well as equipment to be used along the whole extent of the oil flow in the system and to add the function which makes verification of the above functions easy through a dialogue between users and the system. In order to realize the above, Cosmo Oil and Yokokawa Denki developed jointly an operation control expert system for off-site facilities and the system started its actual operation from October 1986. This article is an outline of the system. The result of its actual operation for one and a half years since its inception showed that the system was operated only by the staff responsible for the operation of the facilities, the workload was reduced to 1/3-1/4 of the workload before the adoption of the system and absolutely no omission of work nor mistake was experienced. (2 figs)

  16. Operation environment construction of geological information database for high level radioactive waste geological disposal

    International Nuclear Information System (INIS)

    Wang Peng; Gao Min; Huang Shutao; Wang Shuhong; Zhao Yongan

    2014-01-01

    To fulfill the requirements of data storage and management in HLW geological disposal, a targeted construction method for data operation environment was proposed in this paper. The geological information database operation environment constructed by this method has its unique features. And it also will be the important support for HLW geological disposal project and management. (authors)

  17. 75 FR 76444 - Environmental Impact Statement (EIS) for Construction and Operation of a Panoramic Survey...

    Science.gov (United States)

    2010-12-08

    ... potential environmental impacts associated with construction and operation of the proposed Panoramic Survey... DEPARTMENT OF DEFENSE Department of the Air Force Environmental Impact Statement (EIS) for Construction and Operation of a Panoramic Survey Telescope and Rapid Response System (Pan-STARRS) at the Summit...

  18. An assessment of potential hydrologic and ecologic impacts of constructing mitigation wetlands, Rifle, Colorado, UMTRA project sites

    International Nuclear Information System (INIS)

    1995-04-01

    This-assessment examines the consequences and risks that could result from the proposed construction of mitigation wetlands at the New and Old Rifle Uranium Mill Tailings Remedial Action (UMTRA) Project sites near Rifle, Colorado. Remediation of surface contamination at those sites is now under way. Preexisting wetlands at or near the Old and New Rifle sites have been cleaned up, resulting in the loss of 0.7 and 10.5 wetland acres (ac) (0.28 and 4.2 hectares [ha]) respectively. Another 9.9 ac (4.0 ha) of wetlands are in the area of windblown contamination west of the New Rifle site. The US Army Corps of Engineers (USACE) has jurisdiction over the remediated wetlands. Before remedial action began, and before any wetlands were eliminated, the USACE issued a Section 404 Permit that included a mitigation plan for the wetlands to be lost. The mitigation plan calls for 34.2 ac (1 3.8 ha) of wetlands to be constructed at the south end and to the west of the New Rifle site. The mitigation wetlands would be constructed over and in the contaminated alluvial aquifer at the New Rifle site. As a result of the hydrologic characteristics of this aquifer, contaminated ground water would be expected to enter the environment through the proposed wetlands. A preliminary assessment was therefore required to assess any potential ecological risks associated with constructing the mitigation wetlands at the proposed location

  19. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    International Nuclear Information System (INIS)

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete

  20. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    International Nuclear Information System (INIS)

    Yu, Ann T.W.; Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Highlights: ► A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. ► However, the reduction cannot be sustained. ► Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006–2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

  1. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Ann T.W., E-mail: bsannyu@polyu.edu.hk [Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong); Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara [Department of Civil and Structural Engineering, Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong)

    2013-01-15

    Highlights: Black-Right-Pointing-Pointer A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. Black-Right-Pointing-Pointer However, the reduction cannot be sustained. Black-Right-Pointing-Pointer Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

  2. Site operator program final report for fiscal years 1992 through 1996

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab.; Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Birasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

    1998-01-01

    The Site Operator Program was an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed at the Idaho National Engineering and Environmental Laboratory. The Program`s goals included the field evaluation of electric vehicles in real-world applications and environments; the support of electric vehicle technology advancement; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles. This report covers Program activities from 1992 to 1996. The Site Operator Program ended in September 1996, when it was superseded by the Field Operations Program. Electric vehicle testing included baseline performance testing, which was performed in conjunction with EV America. The baseline performance parameters included acceleration, braking, range, energy efficiency, and charging time. The Program collected fleet operations data on electric vehicles operated by the Program`s thirteen partners, comprising electric utilities, universities, and federal agencies. The Program`s partners had over 250 electric vehicles, from vehicle converters and original equipment manufacturers, in their operating fleets. Test results are available via the World Wide Web site at http://ev.inel.gov/sop.

  3. Construction and operation of Clinch River Breeder Reactor Plant: Project Management Corporation, Tennessee Valley Authority, and Energy Research and Development Administration. Final environment statement. Docket No. 50-537

    International Nuclear Information System (INIS)

    1977-02-01

    Chapters are included on the site and environs, facility description, environmental impacts due to construction, environmental impact of plant operation environmental measurement and monitoring programs, environmental impacts of postulated accidents, need for the proposed facility, alternatives, and evaluation of the proposed action

  4. Defense waste management operations at the Nevada Test Site

    International Nuclear Information System (INIS)

    Williams, R.E.; Kendall, E.W.

    1988-01-01

    Waste management activities were initiated at the Nevada Test Site (NTS) to dispose of low-level wastes (LLW) produced by the Department of Energy's (DOE's) weapons testing program. Disposal activities have expanded from the burial of atmospheric weapons testing debris to demonstration facilities for greater-than-Class-C (GTCC) waste, transuranic (TRU) waste storage and certification, and the development of a mixed waste (MW) facility. Site specific operational research projects support technology development required for the various disposal facilities. The annual cost of managing the facilities is about $6 million depending on waste volumes and types. The paper discusses site selection; establishment of the Radioactive Waste Management Project; operations with respect to low-level radioactive wastes, transuranic waste storage, greater confinement disposal test, and mixed waste management facility; and related research activities such as tritium migration studies, revegetation studies, and in-situ monitoring of organics

  5. Framework programme for detailed characterisation in connection with construction and operation of a final repository for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    2010-10-15

    This report presents a programme for the detailed investigations planned to be applied during construction and operation of the repository for spent nuclear fuel at Forsmark. The report is part of SKB's application according to the Nuclear Activities Act. The detailed investigations shall provide relevant data on and site-descriptive models for the bedrock, soil deposits and eco-system of the site in order to facilitate a step-wise design and construction of the final repository. This shall be implemented in a manner that all demands on long-term safety are fulfilled, including accurate documentation of the construction work, and so that assessments of the environmental impact of the repository can be made. For the operational phase, the detailed investigations should also provide support to the deposition process with related decisions, thereby enabling fulfilment of the design premises for the siting and construction of deposition tunnels and deposition holes, as well as for deposition of canisters, and for the subsequent backfilling and closure of the repository. The Observational Method will be applied during the construction of the repository. This method entails establishing in advance acceptable limits of behaviour regarding selected geoscientific parameters and preparing a plan with measures to keep the outcome within these limits. Predictions of expected rock properties are established for each tunnel section. The outcome after excavation is compared with the acceptable range of outcomes. Information from detailed characterization will be of essential importance for application of the Observational Method and for adapting the repository to the prevailing rock properties. SKB has for the past several decades developed methods for site characterisation, applying both above- and underground investigation techniques. Experiences from this work, put into practice during the site investigations, has resulted in a solid knowledge and understanding of the

  6. Superconducting Super Collider site environmental report for calendar year 1991. Pre-operational

    International Nuclear Information System (INIS)

    1995-01-01

    This is the first annual SER prepared for the SSC project. It is a pre-operational report, intended primarily to describe the baseline characterization of the Ellis County, Texas site that has been developed subsequent to the Environmental Impact Statement (EIS) and the Supplemental Environmental impact Statement (SEIS). As such, the emphasis will be on environmental compliance efforts, including monitoring and mitigation programs. The SER also reports on the measures taken to meet the commitments made in the EIS and SEIS. These measures are detailed in the Mitigation Action Plan (MAP) (Department of Energy (DOE), 1991), which was prepared following the signing of the Record of Decision (ROD) to construct the SSC in Texas. The SER will continue to be preoperational until the first high-energy (20 trillion electron volt or TeV) protons collisions are observed, at which point the SSC will become operational. At that time, the SER will place more emphasis on the radiological monitoring program. This SER will report on actions taken in 1991 or earlier and briefly mention some of those planned for calendar year 1992. AU actions completed in 1992 will be addressed in the SER for calendar year 1992

  7. Superconducting Super Collider site environmental report for calendar year 1991. Pre-operational

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This is the first annual SER prepared for the SSC project. It is a pre-operational report, intended primarily to describe the baseline characterization of the Ellis County, Texas site that has been developed subsequent to the Environmental Impact Statement (EIS) and the Supplemental Environmental impact Statement (SEIS). As such, the emphasis will be on environmental compliance efforts, including monitoring and mitigation programs. The SER also reports on the measures taken to meet the commitments made in the EIS and SEIS. These measures are detailed in the Mitigation Action Plan (MAP) (Department of Energy (DOE), 1991), which was prepared following the signing of the Record of Decision (ROD) to construct the SSC in Texas. The SER will continue to be preoperational until the first high-energy (20 trillion electron volt or TeV) protons collisions are observed, at which point the SSC will become operational. At that time, the SER will place more emphasis on the radiological monitoring program. This SER will report on actions taken in 1991 or earlier and briefly mention some of those planned for calendar year 1992. AU actions completed in 1992 will be addressed in the SER for calendar year 1992.

  8. The use of on-site Project Officers by a nuclear regulatory body

    International Nuclear Information System (INIS)

    Beare, J.W.

    1977-01-01

    In Canada consideration of applications for licensing nuclear installations is entrusted to the Reactor Safety Advisory Committee within the Atomic Energy Control Board (AECB). The licensing procedure is conducted in three stages (site approval, construction licence, operating licence). In order to control construction and operation of nuclear installations Project Officers are assigned to each particular installation. The policy of AECB is to send these officers on site several months before the reactor reaches criticality; and during reactor operation. This system clearly provides great practical advantages. (NEA) [fr

  9. Review Team Focused Modeling Analysis of Radial Collector Well Operation on the Hypersaline Groundwater Plume beneath the Turkey Point Site near Homestead, Florida

    Energy Technology Data Exchange (ETDEWEB)

    Oostrom, Martinus [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Vail, Lance W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-08-01

    Researchers at Pacific Northwest National Laboratory served as members of a U.S. Nuclear Regulatory Commission review team for the Florida Power & Light Company’s application for two combined construction permits and operating licenses (combined licenses or COLs) for two proposed new reactor units—Turkey Point Units 6 and 7. The review team evaluated the environmental impacts of the proposed action based on the October 29, 2014 revision of the COL application, including the Environmental Report, responses to requests for additional information, and supplemental information. As part of this effort, team members tasked with assessing the environmental effects of proposed construction and operation of Units 6 and 7 at the Turkey Point site reviewed two separate modeling studies that analyzed the interaction between surface water and groundwater that would be altered by the operation of radial collector wells (RCWs) at the site. To further confirm their understanding of the groundwater hydrodynamics and to consider whether certain actions, proposed after the two earlier modeling studies were completed, would alter the earlier conclusions documented by the review team in their draft environmental impact statement (EIS; NRC 2015), a third modeling analysis was performed. The third modeling analysis is discussed in this report.

  10. Construction and initial operation of the Advanced Toroidal Facility

    International Nuclear Information System (INIS)

    Bell, G.L.; Bell, J.D.; Benson, R.D.

    1989-08-01

    The Advanced Toroidal Facility (ATF) torsatron was designed on a physics basis for access to the second stability regime and on an engineering basis for independent fabrication of high-accuracy components. The actual construction, assembly, and initial operation of ATF are compared with the characteristics expected during the design of ATF. 31 refs., 19 figs., 2 tabs

  11. Replacement Power Facility site selection report

    Energy Technology Data Exchange (ETDEWEB)

    Wike, L.D.; Toole, G.L.; Specht, W.L.

    1992-06-01

    The Department of Energy (DOE) has proposed the construction and operation of a Replacement Power Facility (RPF) for supplementing and replacing existing sources of steam and possibly electricity at the Savannah River Site (SRS). DOE is preparing an Environmental Impact Statement (EIS) for this project As part of the impact analysis of the proposed action, the EIS will include a detailed description of the environment where the RPF will be constructed. This description must be specific to the recommended site at SRS, which contains more than 300 square miles of land including streams, lakes, impoundments, wetlands, and upland areas. A formal site-selection process was designed and implemented to identify the preferred RPF site.

  12. Real-time safety risk assessment based on a real-time location system for hydropower construction sites.

    Science.gov (United States)

    Jiang, Hanchen; Lin, Peng; Fan, Qixiang; Qiang, Maoshan

    2014-01-01

    The concern for workers' safety in construction industry is reflected in many studies focusing on static safety risk identification and assessment. However, studies on real-time safety risk assessment aimed at reducing uncertainty and supporting quick response are rare. A method for real-time safety risk assessment (RTSRA) to implement a dynamic evaluation of worker safety states on construction site has been proposed in this paper. The method provides construction managers who are in charge of safety with more abundant information to reduce the uncertainty of the site. A quantitative calculation formula, integrating the influence of static and dynamic hazards and that of safety supervisors, is established to link the safety risk of workers with the locations of on-site assets. By employing the hidden Markov model (HMM), the RTSRA provides a mechanism for processing location data provided by the real-time location system (RTLS) and analyzing the probability distributions of different states in terms of false positives and negatives. Simulation analysis demonstrated the logic of the proposed method and how it works. Application case shows that the proposed RTSRA is both feasible and effective in managing construction project safety concerns.

  13. Design and Construction of Operation Bridge for Research Reactor

    International Nuclear Information System (INIS)

    Jung, Kwangsub; Choi, Jinbok; Lee, Jongmin; Oh, Jinho

    2015-01-01

    The operation bridge contains a lower working deck mounted on a saddle that travels on rails. Upright members are mounted on the saddle to support the upper structure and two hoist monorails. The saddle contains an anti-derail system that is composed of seismic lugs and guide rollers. The operation bridge travels along the rails to transport the fuel assembly, irradiated object, and reactor components in the pools by using tools. Hoists are installed at the top girder. The hoist is suspended from the monorail by means of a motor driven trolley that runs along the monorail. Movements of hoist and trolley are controlled by using the control pendant switch. Processes of design and construction of the operation bridge for the research reactor are introduced. The operation bridge is designed under consideration of functions of handling equipment in the pool and operational limits for safety. Structural analysis is carried out to evaluate the structural integrity in the seismic events. Tests and inspections are also performed during fabrication and installation to confirm the function and safety of the operation bridge

  14. Laparotomy operative note template constructed through a modified Delphi method.

    Science.gov (United States)

    Moore, Lolonya; Churley-Strom, Ruth; Singal, Bonita; O'Leary, Sharon

    2009-05-01

    An operative note is indispensable to physician documentation and decision-making; however, there are no accepted standards for operative note content. Our aim was to use a modified Delphi consensus-building method to construct a uniform operative note template for laparotomy. Using Joint Commission on Accreditation of Healthcare Organizations requirements, literature review, and feedback from 15 medical malpractice defense attorneys, we compiled a draft operative note template of 31 elements. We surveyed 37 Association of Professor of Gynecology and Obstetrics/Solvay scholars asking for their input on inclusion of each item as essential content of the operative note. Two iterations of the survey were required to reach a predetermined 75% level of consensus. Nine elements were eliminated from the template: 6 original and 3 expert-suggested elements. We provide an operative note template that was compiled through a Delphi process.

  15. Operating procedures for the Pajarito Site Critical Assembly Facility

    International Nuclear Information System (INIS)

    Malenfant, R.E.

    1983-03-01

    Operating procedures consistent with DOE Order 5480.2, Chapter VI, and the American National Standard Safety Guide for the Performance of Critical Experiments are defined for the Pajarito Site Critical Assembly Facility of the Los Alamos National Laboratory. These operating procedures supersede and update those previously published in 1973 and apply to any criticality experiment performed at the facility

  16. Study on the operational guides of the off-site emergency management center

    International Nuclear Information System (INIS)

    Park, Won Jong; Han, S. J.; Oh, K. H.

    2005-01-01

    The emergency response organizational groups and roles of Off-site Emergency Management Center was proposed to respond in case of radiological emergency. Development of implementing procedures of Off-site Emergency Management Center in case of radiological emergency to improve effective co-operation and rapid response in radiological emergency. Establishment of 'The Ordinance of Operation of residence radiological emergency office of the Minister of Science and Technology' and announced by the Minister of Science and Technology. The Implementing procedures of Off-site Emergency Management Center and 'The Ordinance of Operation of residence radiological emergency office of the Minister of Science and Technology' can be provide guidelines in case of emergency

  17. The measurement of radon concentration of soil in a civil construction site

    International Nuclear Information System (INIS)

    Liu Hanbin; Fan Guang

    2004-01-01

    Radon is one of radioactive resources which do harm to human body. Therefore, its concentration in the soil should be measured before the civil construction works. Code for Indoor Environmental Pollution Control of Civil Building Engineering (GB50325-2001) is the main norm used for soil radon concentration measurement. By using FD-3017 RaA radon measuring equipment, the soil radon concentration in a civil building engineering site has been measured, the result shows that the concentration is lower than the regional average value, radon protective measures should not be installed in that site. (authors)

  18. Constructs and methods for genome editing and genetic engineering of fungi and protists

    Science.gov (United States)

    Hittinger, Christopher Todd; Alexander, William Gerald

    2018-01-30

    Provided herein are constructs for genome editing or genetic engineering in fungi or protists, methods of using the constructs and media for use in selecting cells. The construct include a polynucleotide encoding a thymidine kinase operably connected to a promoter, suitably a constitutive promoter; a polynucleotide encoding an endonuclease operably connected to an inducible promoter; and a recognition site for the endonuclease. The constructs may also include selectable markers for use in selecting recombinations.

  19. Chemistry control at Bruce NGS 'B' from constructed to commercial operation

    International Nuclear Information System (INIS)

    Roberts, J.G.

    1987-01-01

    Pre-operational storage chemistry and flushing of the secondary side is described. The approach devised for Bruce NGS 'B' Unit 6 was unique for an Ontario Hydro Nuclear Unit. The significance of the improved Construction installation and Quality Assurance procedures, combined with those of Operations is identified. Secondary side chemistry during both commissioning and later operation is reported. It will be shown that the application of ALARA (As Low As is Reasonably Achievable) concept has resulted in tighter chemical specifications being met

  20. Safety inspections in construction sites: A systems thinking perspective.

    Science.gov (United States)

    Saurin, Tarcisio Abreu

    2016-08-01

    Although safety inspections carried out by government officers are important for the prevention of accidents, there is little in-depth knowledge on their outcomes and processes leading to these. This research deals with this gap by using systems thinking (ST) as a lens for obtaining insights into safety inspections in construction sites. Thirteen case studies of sites with prohibited works were carried out, discussing how four attributes of ST were used in the inspections. The studies were undertaken over 6 years, and sources of evidence involved participant observation, direct observations, analysis of documents and interviews. Two complementary ways for obtaining insights into inspections, based on ST, were identified: (i) the design of the study itself needs to be in line with ST; and (ii) data collection and analysis should focus on the agents involved in the inspections, the interactions between agents, the constraints and opportunities faced by agents, the outcomes of interactions, and the recommendations for influencing interactions. Copyright © 2015 Elsevier Ltd. All rights reserved.

  1. Current Research Status of KHNP for Site Risk

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Kyemin; Jeon, Ho-Jun; Bahng, Ki-In; Na, Jang-Hwan [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    In Korea, by the geographical characteristics, many Nuclear Power Plants (NPPs) have been constructed and operated at a single site. This is above average level or number of plants per site in the world. For this reason, the public concerns for the safety of nuclear facilities increased after Fukushima Daiichi accident. As a result, comprehensive risk assessment and management for the site which have multi-unit NPPs were strongly asked. Currently, to solve it, many researches and projects has carried out by various Korean companies, research centers, and regulatory authorities. In this paper, R and D plans of KHNP for multi-unit risk were summarized. Firstly, the needs of multi-unit PSA were reviewed. R and D activities and plans of KHNP were summarized in the last part. In this paper, we summarized the R and D plans of KHNP for assessing the multi-unit risk. Currently, multi-unit risk or multi-unit PSA are important and practical issues in both nuclear industry and national energy policy. After Fukushima accident, several countries stopped the construction and the operation of NPPs, other countries which is maintaining the NPPs are being strongly asked to assess the risk for multi-unit NPPs at the same site. Because of Korean geographical characteristics, the number of NPPs which are above average level or number of plants per site in the world is being constructed and operated at a single site. The population density nearby each site is considered to be higher than that of other countries.

  2. Current Research Status of KHNP for Site Risk

    International Nuclear Information System (INIS)

    Oh, Kyemin; Jeon, Ho-Jun; Bahng, Ki-In; Na, Jang-Hwan

    2016-01-01

    In Korea, by the geographical characteristics, many Nuclear Power Plants (NPPs) have been constructed and operated at a single site. This is above average level or number of plants per site in the world. For this reason, the public concerns for the safety of nuclear facilities increased after Fukushima Daiichi accident. As a result, comprehensive risk assessment and management for the site which have multi-unit NPPs were strongly asked. Currently, to solve it, many researches and projects has carried out by various Korean companies, research centers, and regulatory authorities. In this paper, R and D plans of KHNP for multi-unit risk were summarized. Firstly, the needs of multi-unit PSA were reviewed. R and D activities and plans of KHNP were summarized in the last part. In this paper, we summarized the R and D plans of KHNP for assessing the multi-unit risk. Currently, multi-unit risk or multi-unit PSA are important and practical issues in both nuclear industry and national energy policy. After Fukushima accident, several countries stopped the construction and the operation of NPPs, other countries which is maintaining the NPPs are being strongly asked to assess the risk for multi-unit NPPs at the same site. Because of Korean geographical characteristics, the number of NPPs which are above average level or number of plants per site in the world is being constructed and operated at a single site. The population density nearby each site is considered to be higher than that of other countries

  3. Decisions on sites by Laender parliaments

    International Nuclear Information System (INIS)

    1977-01-01

    The Vereinigung Deutscher Elektrizitaetswerke (VDEW, Association of German Electricity Utilities) proposes two independent steps in the licensing procedure for each nuclear power plant constuction project: one first phase in which to establish site guarantees, and one licensing phase for construction and operation of the power plant. The first phase should henceforth proceed with the active participation of the public involved within the framework of a plans approval procedure. The novel aspect would be the binding clarification in this procedure not only of the nuclear aspects of the case, as formerly, but of all public aspects relating to the site. The construction and operating permits, which would constitute phase two, could then be handled in the usual procedure without any need for urgency. (orig.) [de

  4. Design improvements, construction and operating experience with BWRs in Japan

    International Nuclear Information System (INIS)

    Uchigasaki, G.; Yokomi, M.; Sasaki, M.; Aoki, R.; Hashimoto, H.

    1983-01-01

    (1) The first domestic-made 1100-MW(e) BWR in Japan commenced commercial operation in April 1982. The unit is the leading one of the subsequent three in Fukushima Daini nuclear power station owned by the Tokyo Electric Power Company Inc. (Tepco). Based on the accumulated construction and operation experience of 500-MW(e) and 800-MW(e) class BWRs, improvements in various aspects during both the design and construction stages were introduced in core and fuel design with advanced gadolinia distribution, reactor feedwater treatment technology for crud reduction, a radwaste island, control and instrumentation to cope with the lessons learned through Three Mile Island assessment etc. (2) Based on many operating experiences with BWRs, an improved BWR core, which has easier operability and higher load factor than the conventional core, has been developed. The characteristic of the improved core is ''axially two-zoned uranium enrichment distribution''; the enrichment of the upper part of the fuel is slightly higher than that of the lower part. Through the improved core it became possible to optimize the axial power flattening and core reactivity control separately by axial enrichment distribution and burnable poison content. The improved fuels were loaded into operating BWRs and successfully proved the performance by this experience. (3) To shorten annual outage time, to reduce radiation exposure, to save manpower, and to achieve high reliability and safety of inspection operation, the remote automatic service and inspection equipment were developed in Japan. This paper presents the concept, distinctive features, and actual operation experience of the automatic refuelling machine, control-rod drive (CRD) remote-handling machine, improved main steam line isolation plug, and the automated ultrasonic inspection system with a computerized data processing unit, which have been developed by Hitachi, Ltd. with excellent results. (author)

  5. Geographic and Operational Site Parameters List (GOSPL) for Hanford Assessments

    Energy Technology Data Exchange (ETDEWEB)

    Last, George V.; Nichols, William E.; Kincaid, Charles T.

    2006-06-01

    This data package was originally prepared to support a 2004 composite analysis (CA) of low-level waste disposal at the Hanford Site. The Technical Scope and Approach for the 2004 Composite Analysis of Low Level Waste Disposal at the Hanford Site (Kincaid et. al. 2004) identified the requirements for that analysis and served as the basis for initial preparation of this data package. Completion of the 2004 CA was later deferred, with the 2004 Annual Status Report for the Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site (DOE 2005) indicating that a comprehensive update to the CA was in preparation and would be submitted in 2006. However, the U.S. Department of Energy (DOE) has recently decided to further defer the CA update and will use the cumulative assessment currently under preparation for the environmental impact statement (EIS) being prepared for tank closure and other site decisions as the updated CA. Submittal of the draft EIS is currently planned for FY 2008. This data package describes the facility-specific parameters (e.g. location, operational dates, etc.) used to numerically simulate contaminant flow and transport in large-scale Hanford assessments. Kincaid et al. (2004) indicated that the System Assessment Capability (SAC) (Kincaid et al. 2000; Bryce et al. 2002; Eslinger 2002a, 2002b) would be used to analyze over a thousand different waste sites. A master spreadsheet termed the Geographic and Operational Site Parameters List (GOSPL) was assembled to facilitate the generation of keyword input files containing general information on each waste site/facility, its operational/disposal history, and its environmental settings (past, current, and future). This report briefly describes each of the key data fields, including the source(s) of data, and provides the resulting inputs to be used for large-scale Hanford assessments.

  6. Unique Construction and Social Experiences in Residential Remediation Sites - 13423

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Paul; Scarborough, Rebecca [Sevenson Environmental Services, Inc. 2749 Lockport Road, Niagara Falls, NY 14305 (United States)

    2013-07-01

    Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work there were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)

  7. Unique Construction and Social Experiences in Residential Remediation Sites - 13423

    International Nuclear Information System (INIS)

    Jung, Paul; Scarborough, Rebecca

    2013-01-01

    Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work there were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)

  8. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  9. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  10. Yucca Mountain Site Characterization Project exploratory studies facilities construction status

    International Nuclear Information System (INIS)

    Allan, J.N.; Leonard, T.M.

    1993-01-01

    This paper discusses the progress to date on the construction planning and development of the Yucca Mountain Site Characterization Project (YMP) Exploratory Studies Facilities (ESF). The purpose of the ESF is to determine early site suitability and to characterize the subsurface of the Yucca Mountain site to assess its suitability for a potential high level nuclear waste repository. The present ESF configuration concept is for two main ramps to be excavated by tunnel boring machines (TBM) from the surface to the Topopah Spring Member of the Paintbrush Tuff Formation. From the main ramps, slightly above Topopah Spring level, supplemental ramps will be penetrated to the Calico Hills formation below the potential repository. There will be exploratory development drifts driven on both levels with the Main Test Area being located on the Topopah Spring level, which is the level of the proposed repository. The Calico Hills formation lies below the Topopah Spring member and is expected to provide the main geo-hydrologic barrier between the potential repository and the underlying saturated zones in the Crater Flat Tuff

  11. 77 FR 30588 - R.J. Corman Railroad Company/Pennsylvania Lines Inc.-Construction and Operation Exemption-In...

    Science.gov (United States)

    2012-05-23

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35116] R.J. Corman Railroad Company/Pennsylvania Lines Inc.-- Construction and Operation Exemption--In Clearfield County, PA.... 10901 for R.J. Corman Railroad Company/Pennsylvania Lines Inc. (RJCP) to construct and operate 10.8...

  12. Construction management at the SP-100 ground engineering system test site

    International Nuclear Information System (INIS)

    Burchell, G.P.; Wilson, L.R.

    1991-01-01

    Contractors under the U.S. Department of Energy management have implemented a comprehensive approach to the management of design and construction of the complex facility modifications at the SP-100 Ground Engineering System Test Site on the Hanford Reservation. The SP-100 Test Site employs a multi-organizational integrated management approach with clearly defined responsibilities to assure success. This approach allows for thorough planning and analysis before the project kick off, thus minimizing the number and magnitude of problems which arise during the course of the project. When combined with a comprehensive cost and schedule/project management reporting system the problems which do occur are recognized early enough to assure timely intervention and resolution

  13. Proceedings of the CNRA Workshop on New Reactor Siting, Licensing and Construction Experience

    International Nuclear Information System (INIS)

    2011-01-01

    This report documents the proceedings from the 'Workshop on New Reactor Siting, Licensing and Construction Experience', held in Prague, Czech Republic on 15-17 September 2010. A total of 59 specialists from 16 countries and international organisations attended. The Meeting was sponsored by the OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities and hosted by the State Office for Nuclear Safety (SUJB) in Czech Republic. The objectives of the workshop were to review and discuss recent and past construction experience lessons learned including perspectives from regulatory authorities, as well as vendors, and licensee. The workshop addressed issues associated with project management resources including: a) overall human resources, expertise, experience and organisation available to the licensee, b) capability of each potential vendor (in-house knowledge and skills versus planned subcontracting and subcontractor management). The workshop also discussed the lessons learned in the regulation of site selection, evaluation and site preparation as well as the review of regulatory practices for the licensing of new reactors, including the regulatory body infrastructure, staffing and expertise needed. The workshop provided an excellent opportunity to communicate recent experience on these topics to a wider audience, including participants from OECD member countries as well as New Entrants from non-OECD member countries. The workshop allowed the WGRNR group to introduce and discuss the current programme of work and products under development in order to gain insights from workshop participants on each of the programme of work areas, and get feedback on additional focus areas. The workshop was structured in 4 technical sessions, each followed by ample time for panel discussions. The first technical session was devoted to presentations of the licensing process for new reactors followed by different member countries. The second technical session was

  14. Earth-covered storage of LPG - Development, construction and operating experiences

    International Nuclear Information System (INIS)

    Schuldt, P.; Grote, G.

    1990-01-01

    The paper describes the planning, approval procedures, design, fabrication, site-assembling and the testing of liquefied petroleum gas storage tanks. The practical experience after three years of operation is reported. 8 figs

  15. Spherical and plane integral operators for PDEs construction, analysis, and applications

    CERN Document Server

    Sabelfeld, Karl K

    2013-01-01

    The book presents integral formulations for partial differential equations, with the focus on spherical and plane integral operators. The integral relations are obtained for different elliptic and parabolic equations, and both direct and inverse mean value relations are studied. The derived integral equations are used to construct new numerical methods for solving relevant boundary value problems, both deterministic and stochastic based on probabilistic interpretation of the spherical and plane integral operators.

  16. BIM for Construction Site Logistics Management

    Directory of Open Access Journals (Sweden)

    K. Whitlock

    2018-01-01

    Full Text Available Emerging Building Information Modelling (BIM has been hailed as a revolutionary technology and information management process that facilitates collaboration and more efficient design and construction processes through innovative 3D modelling software, open access to information and multidisciplinary integration. The deadline of compliance to BIM level 2 on all public sector centrally procured construction projects has expired leaving many construction firms anxious to adopt BIM. Most common documented applications of BIM have been in the areas of architectural and structural design, quantity surveying, construction project management, and sustainability with very limited peer-reviewed studies on construction logistics management. The aim of this study is to investigate how BIM can be applied to construction logistics management. This study adopts a desk-top approach, with articles sources from renowned scientific databases such as ScienceDirect, Google Scholar and Emerald. The study culminated in the identification of benefits and barriers of adopting BIM for construction logistics management. Given only a desk-top approach has been used, the recommendation for future study is to build on this to conduct an empirical study using both qualitative and quantitative data. This will provide an in-depth understanding of the use of BIM for construction logistics management and open opportunities for further research.

  17. Independent verification in operations at nuclear power plants: Summaries of site visits

    International Nuclear Information System (INIS)

    Donderi, D.C.; Smiley, A.; Ostry, D.J.; Moray, N.P.

    1995-09-01

    A critical review of approaches to independent verification in operations used in nuclear power plant quality assurance programs in other countries was conducted and are detailed in volume 1. This paper is a compilation of the visits to nuclear power plant sites to study independent verification in operations at sites in Canada, USA, Japan, United Kingdom, France and Germany. 3 tabs., 22 figs

  18. Siting, design and construction of underground repositories for radioactive wastes

    International Nuclear Information System (INIS)

    1986-01-01

    The objectives of the Symposium were to provide a forum for exchange of information internationally on the various scientific, technological, engineering and safety bases for the siting, design and construction of underground repositories, and to highlight current important issues and identify possible approaches. Forty-nine papers were presented, covering general approaches and regulatory aspects, disposal in shallow ground and rock cavities, disposal in deep geological formations and safety assessments related to the subject of the Symposium. Separate abstracts were prepared for each of these papers

  19. Environmental impact assessment on the construction and operation of municipal solid waste sanitary landfills in developing countries: China case study

    DEFF Research Database (Denmark)

    Yang, Na; Damgaard, Anders; Lü, Fan

    2014-01-01

    An inventory of material and energy consumption during the construction and operation (C&O) of a typical sanitary landfill site in China was calculated based on Chinese industrial standards for landfill management and design reports. The environmental impacts of landfill C&O were evaluated through...... life cycle assessment (LCA). The amounts of materials and energy used during this type of undertaking in China are comparable to those in developed countries, except that the consumption of concrete and asphalt is significantly higher in China. A comparison of the normalized impact potential between...

  20. Three integrated photovoltaic/sound barrier power plants. Construction and operational experience

    International Nuclear Information System (INIS)

    Nordmann, T.; Froelich, A.; Clavadetscher, L.

    2002-01-01

    After an international ideas competition by TNC Switzerland and Germany in 1996, six companies where given the opportunity to construct a prototype of their newly developed integrated PV-sound barrier concepts. The main goal was to develop highly integrated concepts, allowing the reduction of PV sound barrier systems costs, as well as the demonstration of specific concepts for different noise situations. This project is strongly correlated with a German project. Three of the concepts of the competition are demonstrated along a highway near Munich, constructed in 1997. The three Swiss installations had to be constructed at different locations, reflecting three typical situations for sound barriers. The first Swiss installation was the world first Bi-facial PV-sound barrier. It was built on a highway bridge at Wallisellen-Aubrugg in 1997. The operational experience of the installation is positive. But due to the different efficiencies of the two cell sides, its specific yield lies somewhat behind a conventional PV installation. The second Swiss plant was finished in autumn 1998. The 'zig-zag' construction is situated along the railway line at Wallisellen in a densely inhabited area with some local shadowing. Its performance and its specific yield is comparatively low due to a combination of several reasons (geometry of the concept, inverter, high module temperature, local shadows). The third installation was constructed along the motor way A1 at Bruettisellen in 1999. Its vertical panels are equipped with amorphous modules. The report show, that the performance of the system is reasonable, but the mechanical construction has to be improved. A small trial field with cells directly laminated onto the steel panel, also installed at Bruettisellen, could be the key development for this concept. This final report includes the evaluation and comparison of the monitored data in the past 24 months of operation. (author)

  1. Overview of Nevada Test Site Radioactive and Mixed Waste Disposal Operations

    International Nuclear Information System (INIS)

    Carilli, J.T.; Krenzien, S.K.; Geisinger, R.G.; Gordon, S.J.; Quinn, B.

    2009-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office Environmental Management Program is responsible for carrying out the disposal of on-site and off-site generated low-level radioactive waste (LLW) and low-level radioactive mixed waste (MW) at the Nevada Test Site (NTS). Core elements of this mission are ensuring safe and cost-effective disposal while protecting workers, the public, and the environment. This paper focuses on the impacts of new policies, processes, and opportunities at the NTS related to LLW and MW. Covered topics include: the first year of direct funding for NTS waste disposal operations; zero tolerance policy for non-compliant packages; the suspension of mixed waste disposal; waste acceptance changes; DOE Consolidated Audit Program (DOECAP) auditing; the 92-Acre Area closure plan; new eligibility requirements for generators; and operational successes with unusual waste streams

  2. Operators guide: Atmospheric Release Advisory Capability (ARAC) site facility

    International Nuclear Information System (INIS)

    Lawver, B.S.

    1977-01-01

    In this report capabilities and services are described for the Atmospheric Release Advisory Capability (ARAC). The ARAC site system and its operating procedures and interactions with the ARAC central facility located at LLL is outlined. ARAC is designed to help officials at designated ERDA sites and other locations in estimating the effects of atmospheric releases of radionuclides or other hazardous materials by issuing real-time advisories to guide them in their planning

  3. Operators guide: Atmospheric Release Advisory Capability (ARAC) site facility

    International Nuclear Information System (INIS)

    Cassaro, E.; Lomonaco, L.

    1979-01-01

    The Atmospheric Release Advisory Capability (ARAC) is designed to help officials at designated DOE sites and other locations in estimating the effects of atmospheric releases of radionuclides or other hazardous materials by issuing real-time advisories to guide them in their planning. This report outlines the capabilities and sources of ARAC, and in more detail describes an ARAC Site Facility, its operating procedures and interactions with the ARAC Central Facility (ACF) located at LLL

  4. The licensing procedure for construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Salvatore, J.E.L.

    1980-03-01

    The licensing procedure for the construction and operation of the nuclear power plants in Brazil is analysed, according to the International Atomic Energy Agency orientation. The risks related to the nuclear energy is also emphasized. (A.L.) [pt

  5. SSC [Superconducting Super Collider] site evaluations

    International Nuclear Information System (INIS)

    1988-11-01

    With this report, the SSC Site Task Force forwards to the Director, Office of Energy Research, US Department of Energy (DOE), its evaluation of the technical criteria and life-cycle costs for the proposed SSC sites judged to be the best qualified. The criteria against which each site was evaluated are those set forth in the Invitation for Site Proposals for the Superconducting Super Collider (DOE/ER-0315) (Invitation) which was prepared by the Task Force and issued in April 1987. The methodology followed by the Task Force in this report and in all other phases of the proposal evaluation has been consistent with the SSC site selection process approved by DOE's Energy System Acquisition Advisory Board (ESAAB). The goal of the site selection process is to identify a site that will permit the highest level of research productivity and overall effectiveness of the SSC at a reasonable cost of construction and operation and with minimial impact on the environment. The Task Force acknowledges that all seven sites are, indeed, highly qualified locations for the construction and operation of the SSC on the basis of technical and cost considerations. In performing its evaluation, which is presented in this paper, the Task Force took an in-depth look at each site on the basis of site visits and extensive technical analyses. A consensus rating for each technical evaluation criterion and subcriterion was developed for each site

  6. Initial Operation of the Savannah River Site Advanced Storage Monitoring Facility

    International Nuclear Information System (INIS)

    McCurry, D.R.

    2001-01-01

    An advanced storage monitoring facility has been constructed at the Savannah River Site capable of storing sensitive nuclear materials (SNM) with access to monitoring information available over the Internet. This system will also have monitoring information available over the Internet to appropriate users. The programs will ultimately supply authenticated and encrypted data from the storage sites to certified users to demonstrate the capability of using the Internet as a safe and secure communications medium for remote monitoring of sensitive items

  7. Conceptual design and analysis of roads and road construction machinery for initial lunar base operations

    Science.gov (United States)

    Sines, Jeffrey L.; Banks, Joel; Efatpenah, Keyanoush

    1990-01-01

    Recent developments have made it possible for scientists and engineers to consider returning to the Moon to build a manned lunar base. The base can be used to conduct scientific research, develop new space technology, and utilize the natural resources of the Moon. Areas of the base will be separated, connected by a system of roads that reduce the power requirements of vehicles traveling on them. Feasible road types for the lunar surface were analyzed and a road construction system was designed for initial lunar base operations. A model was also constructed to show the system configuration and key operating features. The alternate designs for the lunar road construction system were developed in four stages: analyze and select a road type; determine operations and machinery needed to produce the road; develop machinery configurations; and develop alternates for several machine components. A compacted lunar soil road was selected for initial lunar base operations. The only machinery required to produce this road were a grader and a compactor. The road construction system consists of a main drive unit which is used for propulsion, a detachable grader assembly, and a towed compactor.

  8. Assessment of the impact of nuclear power plant construction and operation on small regions

    International Nuclear Information System (INIS)

    Johnson, M.H. Jr.

    1977-01-01

    This study addresses the problem of the comprehensive, quantitative evaluation of the environmental, economic, and social impacts of the construction and operation of nuclear power plant on a given region. A theoretical model of the regional impacts is constructed employing input-output methods that are extended to include ecologic as well as economic effects. Thus, the regional model explicitly incorporates environmental feedback as a consequence of economic activity. The model is then employed to estimate the impact of the construction and operation of a nuclear power facility on a small region in South Carolina. Measures of economic and environmental effects include estimates of changes in output, income, employment, local government revenue and expenditure, external costs of environmental decay, pollution loads, and common-property resource usage. Results indicate that, in the South Carolina case study, significant gains in social welfare accrued to the region due to the construction and operation of the nuclear power facility. Further, the theoretical method developed herein provides a comprehensive method of objectively assessing various types of impacts on a region as small as several contiguous counties or even a single county

  9. Siting considerations for radioactivity in reactor effluents during normal operation

    International Nuclear Information System (INIS)

    Graf, J.M.; Strom, P.O.

    1975-01-01

    In selecting a proper site for a nuclear power station, the consideration of radioactivity released in effluents can be handled in a straightforward manner using the U. S. Atomic Energy Commission's proposed Appendix I to 10 CFR 50, which gives numerical guidelines for design objectives for meeting the criterion ''as low as practicable'' for radioactive material in light-water-cooled nuclear power reactor effluents. By relating the release of radioactive material, the site meteorological conditions, and site boundary distance through appropriate dose models, the suitability of a given site can be determined. ''Rules of thumb'' for comparing anticipated releases to design objectives can be constructed for rapid assessment using the maximum permissible concentration values of 10 CFR 20 as dose factors. These rules of thumb tend to underpredict the allowed releases except in the case of radiocesium in liquids. For gaseous releases, these rules of thumb can be made up in convenient nomogram form for a quick assessment of allowed releases based on local site meteorological conditions. (U.S.)

  10. Mechanic- and hydraulic shock-absorbers - layout, construction, operation experience

    International Nuclear Information System (INIS)

    Kluge, M.

    1981-01-01

    The problem lies in the protection of the flexible supported power plant components against undesired sudden movements. Various shock absorbing systems are at disposal in this case: Mechanical and hydraulic shock absorbers, whose functioning systems are shown in figures. The operation experience showed a series of deficiencies, as demonstrated on various figures. In order to avoid them, some important recommendations are given. Requirements and layout are demonstrated according to todays' state-of-the-art. The admissible stresses, resulting from the summary of various specifications for the analytical evidence will be described. Development and construction will be explained in detail by means of pictures with cross sections of original shock absorbers. Todays' construction characteristics will be summarized. The final remark includes a request for generally valid guidelines. (orig.) [de

  11. Site characterization and construction of a controlled shallow test site in central Mexico for archaeological and engineering applications

    Science.gov (United States)

    Rosado-Fuentes, A.; Arango-Galvan, C.; Arciniega-Ceballos, A.; Hernández-Quintero, J. E.; Mendo-Perez, G.

    2017-12-01

    A controlled shallow test site (CSTS) has been constructed at the UNAM Geomagnetic Observatory in Teoloyucan, central Mexico. The objective of the CSTS is to have a controlled place to test new developments and arrays that can be used for archaeological and engineering exploration, as well as to calibrate instruments, train students and for future research. The CSTS was built far enough not to influence the geomagnetic sensors and not be affected by noise sources. Special attention was given to the distribution and geometry of buried materials as well as the instruments used. Before the CSTS was built, a combination of near-surface, non-invasive geophysical techniques was performed to characterize the area of 20 by 32 meters. The methods include magnetometry, electromagnetic induction, ground penetrating radar (GPR), electrical resistivity tomography (ERT) and seismic refraction tomography (SRT). The GPR, SRT and ERT results show relatively flat interfaces. In general, the vertical gradient of the total magnetic field and the electric conductivity have very small variations, showing only one strong magnetic dipole associated to a shallow anomaly. These results indicate that the area is ideal for the construction of the test site. The CSTS consists on buried structures made with different materials and geometries (cubes, cylinders and tubes) commonly used as construction materials in Mexico since Pre-Hispanic times. These materials include concrete, reinforced concrete, wood, brick, adobe, basalt, tezontle and also empty space for controlling responses. The CSTS is versatile enough to be reshaped considering new geometries or materials and to conduct further investigations.

  12. NIF conventional facilities construction health and safety plan

    International Nuclear Information System (INIS)

    Benjamin, D W

    1998-01-01

    The purpose of this Plan is to outline the minimum health and safety requirements to which all participating Lawrence Livermore National Laboratory (LLNL) and non-LLNL employees (excluding National Ignition Facility [NIF] specific contractors and subcontractors covered under the construction subcontract packages (e.g., CSP-9)-see Construction Safety Program for the National Ignition Facility [CSP] Section I.B. ''NIF Construction Contractors and Subcontractors'' for specifics) shall adhere to for preventing job-related injuries and illnesses during Conventional Facilities construction activities at the NIF Project. For the purpose of this Plan, the term ''LLNL and non-LLNL employees'' includes LLNL employees, LLNL Plant Operations staff and their contractors, supplemental labor, contract labor, labor-only contractors, vendors, DOE representatives, personnel matrixed/assigned from other National Laboratories, participating guests, and others such as visitors, students, consultants etc., performing on-site work or services in support of the NIF Project. Based upon an activity level determination explained in Section 1.2.18, in this document, these organizations or individuals may be required by site management to prepare their own NIF site-specific safety plan. LLNL employees will normally not be expected to prepare a site-specific safety plan. This Plan also outlines job-specific exposures and construction site safety activities with which LLNL and non-LLNL employees shall comply

  13. Lease Operations Environmental Guidance Document

    Energy Technology Data Exchange (ETDEWEB)

    Bureau of Land Management

    2001-02-14

    This report contains discussions in nine different areas as follows: (1) Good Lease Operating Practices; (2) Site Assessment and Sampling; (3) Spills/Accidents; (4) Containment and Disposal of Produced Waters; (5) Restoration of Hydrocarbon Impacted Soils; (6) Restoration of Salt Impacted Soils; (7) Pit Closures; (8) Identification, Removal and Disposal of Naturally Occurring Radioactive Materials (NORM); and (9) Site Closure and Construction Methods for Abandonment Wells/Locations. This report is primary directed towards the operation of oil and gas producing wells.

  14. Explicit construction of quasiconserved local operator of translationally invariant nonintegrable quantum spin chain in prethermalization

    Science.gov (United States)

    Lin, Cheng-Ju; Motrunich, Olexei I.

    2017-12-01

    We numerically construct translationally invariant quasiconserved operators with maximum range M , which best commute with a nonintegrable quantum spin chain Hamiltonian, up to M =12 . In the large coupling limit, we find that the residual norm of the commutator of the quasiconserved operator decays exponentially with its maximum range M at small M , and turns into a slower decay at larger M . This quasiconserved operator can be understood as a dressed total "spin-z " operator, by comparing with the perturbative Schrieffer-Wolff construction developed to high order reaching essentially the same maximum range. We also examine the operator inverse participation ratio of the operator, which suggests its localization in the operator Hilbert space. The operator also shows an almost exponentially decaying profile at short distance, while the long-distance behavior is not clear due to limitations of our numerical calculation. Further dynamical simulation confirms that the prethermalization-equilibrated values are described by a generalized Gibbs ensemble that includes such quasiconserved operator.

  15. Occupational health and safety issues in the informal economic segment of Pakistan: a survey of construction sites.

    Science.gov (United States)

    Ahmed, Ishfaq; Shaukat, Muhammad Zeeshan; Usman, Ahmad; Nawaz, Muhammad Musarrat; Nazir, Mian Sajid

    2018-06-01

    This research covers the current status of occupational health and safety (OHS)-related practices in the informal construction segment of Pakistan. Data were collected, through interviews, from 316 construction sites employing 3577 workers. The results of the study reveal that both employers and workers lack knowledge of OHS laws/standards and no practices of this nature are enacted at these construction sites. Alarmingly, work-related accidents, whenever they happen, are not given due attention and there is no formal injury-report system. The informal construction industry employs a huge portion of the informal workforce, and lack of OHS happens at tremendous human cost. These research findings may thus play their role in strengthening the case for reforms in the sector. This study, if properly utilized, may also enable employers of the sector by increasing their knowledge about OHS practices and, as a result, trying to offer safer environments for their workers.

  16. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency's (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter

  17. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined

  18. Construction and operation of biogas plants. Bau und Betrieb von Biogasanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Koenig, F. von

    1985-01-01

    Biogas utilisation in agriculture has increased considerably as a consequence of the energy crisis. So far, energy production was the most important aspect, and the high-quality natural fertilizer offered by the fermentation residues was commonly neglected. This fertilizer is an effective substitute for commercial fertilizers and thus contributes to the reduction of environmental pollution. The book discusses the chemical and biological mechanisms, the criteria of selection for plants and materials, optimum gas production techniques, uses of the product gas, and the advantages and properties of the biofertilizer produced. Planning procedures, design, construction, function and performance of several biogas production plants now in operation are described. Hints are given for do-it-yourself construction, as are cost-benefit calculations and decision aids for construction.

  19. CLASSIFICATION OF THE MGR SITE OPERATIONS SYSTEM

    International Nuclear Information System (INIS)

    J.A. Ziegler

    1999-01-01

    The purpose of this analysis is to document the Quality Assurance (QA) classification of the Monitored Geologic Repository (MGR) site operations system structures, systems and components (SSCs) performed by the MGR Safety Assurance Department. This analysis also provides the basis for revision of YMP/90-55Q, Q-List (YMP 1998). The Q-List identifies those MGR SSCs subject to the requirements of DOE/RW-0333P, ''Quality Assurance Requirements and Description'' (QARD) (DOE 1998)

  20. 75 FR 55631 - U. S. Rail Corporation-Construction and Operation Exemption-Brookhaven Rail Terminal

    Science.gov (United States)

    2010-09-13

    ... the proposed construction is to enable U. S. Rail to serve the BRT as a common carrier and to deliver... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35141] U. S. Rail Corporation--Construction and Operation Exemption-- Brookhaven Rail Terminal AGENCY: Surface Transportation...

  1. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site. Annual report, FY-1991 and FY-1992

    Energy Technology Data Exchange (ETDEWEB)

    Scott, D.E.; Chazel, A.C.; Pechmann, J.H.K.; Estes, R.A.

    1993-06-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980`s. The Savannah River Ecology Laboratory (SREL) has completed 14 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ``refuge ponds`` as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10 CFR 1022).

  2. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    Science.gov (United States)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.

  3. National Ignition Facility site requirements

    International Nuclear Information System (INIS)

    1996-07-01

    The Site Requirements (SR) provide bases for identification of candidate host sites for the National Ignition Facility (NIF) and for the generation of data regarding potential actual locations for the facilities. The SR supplements the NIF Functional Requirements (FR) with information needed for preparation of responses to queries for input to HQ DOE site evaluation. The queries are to include both documents and explicit requirements for the potential host site responses. The Sr includes information extracted from the NIF FR (for convenience), data based on design approaches, and needs for physical and organization infrastructure for a fully operational NIF. The FR and SR describe requirements that may require new construction or may be met by use or modification of existing facilities. The SR do not establish requirements for NIF design or construction project planning. The SR document does not constitute an element of the NIF technical baseline

  4. Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

    International Nuclear Information System (INIS)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    2012-01-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W PandT) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012

  5. Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dorr, Kent A. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Ostrom, Michael J. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Freeman-Pollard, Jhivaun R. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2012-11-14

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.

  6. Research on website construction based on website group platform of Chengdu sport institution

    Science.gov (United States)

    Hu, Zunyu

    2018-04-01

    This paper describes the necessity of website construction based on the website group of Chengdu sport institute, and discusses the technical features of the website group, Based on the website group platform architecture, the key technologies such as Web Service, AJAX, RSS and other key technologies are used to realize the construction of the website. Based on the website group platform architecture of the site, it effectively solves the information isolated island between the sites, and realizes the information sharing and resource integration. It is also more convenient that site and other sites have composed of site group integrated operation and maintenance.

  7. Changing priorities of codes and standards -- quality engineering: Experiences in plant construction, maintenance, and operation

    International Nuclear Information System (INIS)

    Antony, D.D.; Suleski, P.F.; Meier, J.C.

    1994-01-01

    Application of the ASME Code across various fossil and nuclear plants necessitates a Company approach adapted by unique status of each plant. This arises from State Statutes, Federal Regulations and consideration of each plant's as-built history over a broad time frame of design, construction and operation. Additionally, the National Board Inspection Code accompanies Minnesota Statutes for plants owned by Northern States Power Company. This paper addresses some key points on NSP's use of ASME Code as a principal mechanical standard in plant design, construction and operation. A primary resource facilitating review of Code provisions is accurate status on current plant configuration. As plant design changes arise, the Code Edition/Addenda of original construction and installed upgrades or replacements are considered against available options allowed by current standards and dialog with the Jurisdictional Authority. Consistent with the overall goal of safe and reliable plant operation, there are numerous Code details and future needs to be addressed in concert with expected plant economics and planned outages for implementation. The discussion begins in the late 60's with new construction of Monticello and Prairie Island (both nuclear), through Sherburne County Units 1 through 3 (fossil), and their changes, replacements or repairs as operating plants

  8. Does modern helicopter construction reduce noise exposure in helicopter rescue operations?

    Science.gov (United States)

    Küpper, Thomas; Jansing, Paul; Schöffl, Volker; van Der Giet, Simone

    2013-01-01

    During helicopter rescue operations the medical personnel are at high risk for hearing damage by noise exposure. There are two important factors to be taken into account: first, the extreme variability, with some days involving no exposure but other days with extreme exposure; second, the extreme noise levels during work outside the helicopter, e.g. during winch operations. The benefit of modern, less noisier constructions and the consequences for noise protection are still unknown. We estimated the noise exposure of the personnel for different helicopter types used during rescue operations in the Alps and in other regions of the world with special regard to the advanced types like Eurocopter EC 135 to compare the benefit of modern constructions for noise protection with earlier ones. The rescue operations over 1 year of four rescue bases in the Alps (Raron and Zermatt in Switzerland; Landeck and Innsbruck in Austria, n = 2731) were analyzed for duration of rescue operations (noise exposure). Noise levels were measured during rescue operations at defined points inside and outside the different aircraft. The setting is according to the European standard (Richtlinie 2003/10/EG Amtsblatt) and to Class 1 DIN/IEC 651. With both data sets the equivalent noise level L(eq8h) was calculated. For comparison it was assumed that all rescue operations were performed with a specific type of helicopter. Then model calculations for noise exposure by different helicopter types, such as Alouette IIIb, Alouette II 'Lama', Ecureuil AS350, Bell UH1D, Eurocopter EC135, and others were performed. Depending on modern technologies the situation for the personnel has been improved significantly. Nevertheless noise prevention, which includes noise intermissions in spare time, is essential. Medical checks of the crews by occupational medicine (e.g. 'G20' in Germany) are still mandatory.

  9. Risk factors for surgical site infection following operative ankle fracture fixation.

    Science.gov (United States)

    Kelly, E G; Cashman, J P; Groarke, P J; Morris, S F

    2013-09-01

    Ankle fracture is a common injury and there is an increasingly greater emphasis on operative fixation. The purpose of the study was to determine the complication rate in this cohort of patients and, in doing so, determine risk factors which predispose to surgical site infection. A prospective cohort study was performed at a tertiary referral trauma center examining risk factors for surgical site infection in operatively treated ankle fractures. Univariate and multivariate analysis was performed. Female gender and advancing age were determined to be the risk factors in univariate analysis. Drain usage and peri-operative pyrexia were found to be significant for infection in multivariate analysis. This study allows surgeons to identify those at increased risk of infection and counsel them appropriately. It also allows for a high level of vigilance with regard to soft tissue handling intra-operatively in this higher risk group.

  10. Surface facilities for geological deep repositories - Measures against dangers during construction and operation

    International Nuclear Information System (INIS)

    2013-09-01

    This brochure published by the Swiss National Cooperative for the Disposal of Radioactive Waste (NAGRA) discusses the measures that are to be taken to address the dangers encountered during the construction and operation of deep geological repositories for nuclear wastes. Firstly, the operation of such repositories during the emplacement of nuclear wastes is discussed and examples of possible repositories for fuel rods and highly-radioactive waste are presented. Various emission-protection issues and safety measures to be taken during construction of such repositories are looked at as is the protection of ground water. Safety considerations during the operational phase are discussed, including inclusion methods used for the wastes and radiation protection. The handling of radioactive wastes, the recognition of dangers and measures to be taken to counteract them are discussed. Various possible accidents are looked at

  11. Selecting, engineering and constructing drilling sites at the Geysers geothermal field. Geysers chinetsu ryoiki ni okeru kussaku shikichi no sentei engineering kochiku

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This paper describes some examples of selection, engineering and construction of drilling sites at the Geysers geothermal field in the northern district of California State. Steep landform, thin-layered soil and violent rainfall create unstable conditions bringing about numerous landslide in the field. Selection of a well drilling site appropriate in such conditions is started by analyzing the aerial photographs by technical staff. After site selection, prospecting and soil test are conducted and a working plan in the well site is decided to prepare engineering drawings. In the construction, land preparation, the open-cutting of base-line trench, etc. are carried out. The base-line trench is a large and sufficiently deep one which is open-cut to the front end or the middle of the bottom part of the well plateau. The final construction work is to build a leading casing for interpolating cementing. The well site construction in the Geysers geothermal field is done in consideration of protecting human life, health and properties. 1 fig.

  12. Experimental Setup for Evaluation of the Protective Technical Measures Against the Slopes Degradation Along Linear Construction Sites

    Science.gov (United States)

    Kavka, Petr; Zumr, David; Neumann, Martin; Lidmila, Martin; Dufka, Dušan

    2017-04-01

    Soil erosion of the slopes along the linear construction sites, such as railroads, roads, pipelines or watercourses, is usually underestimated by the construction companies and controlling authorities. But under certain circumstances, when the construction site is not maintained and protected properly, a large amounts of soil may be transported from the sites to the surrounding environment during the intensive rainfall. Transported sediment, often carrying adsorbed pollutants, may reach watercourses and cause water recipient siltation and pollution. Within the applied research project we investigate ways of low cost, quick and easy technical measures that would help to protect the slopes against the splash erosion, rills development and sliding. The methodology is based on testing of various permeable covers, sheets, anchoring and patchy vegetation on a plot and hillslope scales. In this contribution we will present the experimental plot setup, consisting of large soil blocks encapsulated in the monitored steel containers and nozzle rainfall simulator. The presentation is funded by the Technological Agency of the Czech Republic (research project TH02030428) and an internal student CTU grant.

  13. Exploring Language Choice and Identity Construction in "In-Between" Sites: Ethnic Media and Community Languages Schools in Australia

    Science.gov (United States)

    Rubino, Antonia; Cruickshank, Ken

    2016-01-01

    Australian research on immigrant languages has paid little attention to interactional approaches to language alternation as identity construction, and sites other than the family and the mainstream school. We argue for the need of studies that take into account a wider range of sites, in particular "community" sites, and adopt…

  14. Design of NPP of new generation being constructed at Novovoronezh NPP site

    International Nuclear Information System (INIS)

    Afrov, A.; Berkovich, V.; Generalov, V.; Dragunov, Yu.; Krushelnitskij, V.

    2000-01-01

    The design of a new-generation nuclear power plant with advanced WWER-1000 units, currently under construction at Novovoronezh, is dealt with in considerable detail. Information is given on the general layout of the power plant, and the monoblock comprising the four-loop reactor plant with double containment, the turbine hall with two turbine-driven feedwater pumps and safety and auxiliary systems is described. In a separate building at the power plant site, a new fuel storage facility is located designed for extreme external effects. The operations involved in fuel handling, in both the storage facility and the reactor department, are mentioned. The management of various types of radioactive waste is highlighted. The basic principles of the engineering solutions pertaining to the plant's electrical part are outlined. The concept of the instrumentation and control system is explained. Information is also given on the double containment system. A considerable part of the presentation is devoted to the philosophy and concept of the power plant safety, to the results of safety evaluation and to the research carried out in this respect. The paper is concluded with a discussion of the experiments and analyses performed with the aim to justify the design solutions as regards the passive heat removal system. (A.K.)

  15. On site PWR fuel inspection measurements for operational and design verification

    International Nuclear Information System (INIS)

    1996-01-01

    The on-site inspection of irradiated Pressurized Water Reactor (PWR) fuel and Non-Fuel Bearing Components (NFBC) is typically limited to visual inspections during refuelings using underwater TV cameras and is intended primarily to confirm whether the components will continue in operation. These inspections do not normally provide data for design verification nor information to benefit future fuel designs. Japanese PWR utilities and Nuclear Fuel Industries Ltd. designed, built, and performed demonstration tests of on-site inspection equipment that confirms operational readiness of PWR fuel and NFBC and also gathers data for design verification of these components. 4 figs, 3 tabs

  16. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  17. The primary ion source for construction and optimization of operation parameters

    International Nuclear Information System (INIS)

    Synowiecki, A.; Gazda, E.

    1986-01-01

    The construction of primary ion source for SIMS has been presented. The influence of individual operation parameters on the properties of ion source has been investigated. Optimization of these parameters has allowed to appreciate usefulness of the ion source for SIMS study. 14 refs., 8 figs., 2 tabs. (author)

  18. Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-09-01

    OAK A271 Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne. This Annual Site Environmental Report (ASER) for 1999 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials under the former Atomics International Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. This Annual Site Environmental Report provides information showing that there are no indications of any potential impact on public health and safety due to the operations conducted at the SSFL. All measures and calculations of off-site conditions demonstrate compliance with applicable regulations, which provide for protection of human health and the environment.

  19. Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne

    International Nuclear Information System (INIS)

    None

    2000-01-01

    OAK A271 Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne. This Annual Site Environmental Report (ASER) for 1999 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials under the former Atomics International Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D and D) of the previously used nuclear facilities and associated site areas. Large-scale D and D activities of the sodium test facilities began in 1996. This Annual Site Environmental Report provides information showing that there are no indications of any potential impact on public health and safety due to the operations conducted at the SSFL. All measures and calculations of off-site conditions demonstrate compliance with applicable regulations, which provide for protection of human health and the environment

  20. Pre-operative and early post-operative factors associated with surgical site infection after laparoscopic sleeve gastrectomy.

    Science.gov (United States)

    Ruiz-Tovar, Jaime; Oller, Inmaculada; Llavero, Carolina; Arroyo, Antonio; Muñoz, Jose Luis; Calero, Alicia; Diez, María; Zubiaga, Lorea; Calpena, Rafael

    2013-08-01

    Surgical procedures on obese patients are expected to have a high incidence of surgical site infection (SSI). The identification of pre-operative or early post-operative risk factors for SSI may help the surgeon to identify subjects in risk and adequately optimize their status. We conducted a study of the association of comorbidities and pre- and post-operative analytical variables with SSI following laparoscopic sleeve gastrectomy for the treatment of morbid obesity. We performed a prospective study of all morbidly obese patients undergoing laparoscopic sleeve gastrectomy as a bariatric procedure between 2007 and 2011. An association of clinical and analytical variables with SSI was investigated. The study included 40 patients with a mean pre-operative body mass index (BMI) of 51.2±7.9 kg/m(2). Surgical site infections appeared in three patients (7.5%), of whom two had an intra-abdominal abscess located in the left hypochondrium and the third had a superficial incisional SSI. Pre-operatively, a BMI >45 kg/m(2) (OR 8.7; p=0.008), restrictive disorders identified by pulmonary function tests (OR 10.0; p=0.012), a serum total protein concentration 30 mcg/dL (OR 13.0; p=0.003), and a mean corpuscular volume (MCV) operative SSI. Post-operatively, a serum glucose >128 mg/dL (OR 4.7; p=0.012) and hemoglobin operative anemia and hyperglycemia as risk factors for SSI. In these situations, the surgeon must be aware of and seek to control these risk factors.

  1. Post-operative Wound Site Infection Caused by Nocardia species

    Directory of Open Access Journals (Sweden)

    Sunayana M. Jangla

    2018-04-01

    Full Text Available A61 year old diabetic female who was a known case of breast carcinoma and had undergone mastectomy was admitted with discharge from the post-operative wound site. Nocardia species was isolated from the discharge. She responded to treatment with trimethoprim-sulfamethoxazole.

  2. Information management system for design, construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Bolch, M.C.; Jones, C.R.

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software

  3. Information management system for design, construction and operation of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Bolch, M.C. (Duke Power Co. (US)); Jones, C.R. (S. Levy Inc. (US))

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software.

  4. Nuclear Material Processing at the Savannah River Site

    International Nuclear Information System (INIS)

    Severynse, T.F.

    1998-07-01

    Plutonium production for national defense began at Savannah River in the mid-1950s, following construction of production reactors and separations facilities. Following the successful completion of its production mission, the site's nuclear material processing facilities continue to operate to perform stabilization of excess materials and potentially support the disposition of these materials. A number of restoration and productivity improvement projects implemented in the 1980s, totaling nearly a billion dollars, have resulted in these facilities representing the most modern and only remaining operating large-scale processing facilities in the DOE Complex. Together with the Site's extensive nuclear infrastructure, and integrated waste management system, SRS is the only DOE site with the capability and mission of ongoing processing operations

  5. A suggested color scheme for reducing perception-related accidents on construction work sites.

    Science.gov (United States)

    Yi, June-seong; Kim, Yong-woo; Kim, Ki-aeng; Koo, Bonsang

    2012-09-01

    Changes in workforce demographics have led to the need for more sophisticated approaches to addressing the safety requirements of the construction industry. Despite extensive research in other industry domains, the construction industry has been passive in exploring the impact of a color scheme; perception-related accidents have been effectively diminished by its implementation. The research demonstrated that the use of appropriate color schemes could improve the actions and psychology of workers on site, thereby increasing their perceptions of potentially dangerous situations. As a preliminary study, the objects selected by rigorous analysis on accident reports were workwear, safety net, gondola, scaffolding, and safety passage. The colors modified on site for temporary facilities were adopted from existing theoretical and empirical research that suggests the use of certain colors and their combinations to improve visibility and conspicuity while minimizing work fatigue. The color schemes were also tested and confirmed through two workshops with workers and managers currently involved in actual projects. The impacts of color schemes suggested in this paper are summarized as follows. First, the color schemes improve the conspicuity of facilities with other on site components, enabling workers to quickly discern and orient themselves in their work environment. Secondly, the color schemes have been selected to minimize the visual work fatigue and monotony that can potentially increase accidents. Copyright © 2011 Elsevier Ltd. All rights reserved.

  6. Construction techniques and operation principles of Geiger-Mueller counters using external cathode (Mazetype)

    International Nuclear Information System (INIS)

    Sevegnani, F.X.

    1988-01-01

    The construction techniques for external cathode (Maze) and internal cathode Geiger-Muller counters are described, showing the operation principles and the used material nature. More than 200 counter types were evaluated analysing their characteristics. The influence of several types of guard-rings was studied, for optimizing counter operation conditions. Plateaus of the order of 700 V with slope of 0,3%/100 V for the net counting rate, and 1400 V with a slope of 0,8/100 V for total counts using total pressure of 10 cmHg, were obtained. A counter for β detection, using blown glass window in one of the edges of the cylinder was constructed. Counters of long life using materials such as, mica, adhesive glues, etc., were obtained. The results shown that the best counter operation occurs when it is empty in a vacuum of 10 -5 mmHg. (M.C.K.) [pt

  7. The application of assessment principles to an operational low level waste disposal site in England

    International Nuclear Information System (INIS)

    McHugh, J.O.; Newstead, S.; Weedon, C.J.

    1988-01-01

    This paper reviews the current assessment principles utilized in England and discusses their application to the Drigg low-level Radioactive Waste Disposal Site. The Drigg Site was established in 1959 and the assessment principles were published in 1985; therefore, although the Drigg Site has operated successfully, the application of the assessment principles has caused changes in operations and the establishment of further site research by the Department of the Environment

  8. The ALICE Transition Radiation Detector: construction, operation, and performance

    OpenAIRE

    Acharya, Shreyasi; Adam, Jaroslav; Ahmad, Nazeer; Bhattacharjee, Buddhadeb; Turrisi, Rosario; Tveter, Trine Spedstad; Ullaland, Kjetil; Umaka, Ejiro Naomi; Uras, Antonio; Usai, Gianluca; Utrobicic, Antonija; Vala, Martin; Van Der Maarel, Jasper; Van Hoorne, Jacobus Willem; Bhom, Jihyun

    2018-01-01

    The Transition Radiation Detector (TRD) was designed and built to enhance the capabilities of the ALICE detector at the Large Hadron Collider (LHC). While aimed at providing electron identification and triggering, the TRD also contributes significantly to the track reconstruction and calibration in the central barrel of ALICE. In this paper the design, construction, operation, and performance of this detector are discussed. A pion rejection factor of up to 410 is achieved at a momentum of 1 G...

  9. 36 CFR 6.4 - Solid waste disposal sites not in operation on September 1, 1984.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Solid waste disposal sites... PARK SERVICE, DEPARTMENT OF THE INTERIOR SOLID WASTE DISPOSAL SITES IN UNITS OF THE NATIONAL PARK SYSTEM § 6.4 Solid waste disposal sites not in operation on September 1, 1984. (a) No person may operate...

  10. 200-UP-2 Operable Unit technical baseline report

    International Nuclear Information System (INIS)

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The ''U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO 3 ) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO 3 Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab

  11. Regulatory inspection activities on nuclear power plant sites during construction in the United Kingdom

    International Nuclear Information System (INIS)

    Jeffery, J.V.

    1977-01-01

    The work of regulatory inspection of the construction of the plant on the site is performed not only by the inspector who has been allocated to inspection duties for that site but also by the specialist staff who are involved with the safety assessment of the plant. The co-ordination of this work is described in the paper and examples are given of inspection activities associated with the enforcement requirements of licence conditions as well as those related to the inspection of the plant itself. (author)

  12. Radioactive air emissions notice of construction and application for approval to construct the Hanford Waste Vitrification Plant

    International Nuclear Information System (INIS)

    1992-10-01

    The Hanford Site is owned by the US Government and operated by the US Department of Energy, Richland Field Office. The Hanford Site manages and produces dangerous waste and mixed waste. (containing both radioactive and dangerous components). The US Department of Energy, Richland Field Office, currently stores mixed waste, resulting from various processing operations, in underground storage tanks. The Hanford Waste Vitrification Plant will be constructed and operated to process the high-activity fraction of mixed waste stored in these underground tanks. The Hanford Waste Vitrification Plant will solidify pretreated tank waste into a glass product that will be packaged for disposal in a national repository. Emissions from the Hanford Waste Vitrification Plant will be regulated by both the federal and state Clean Air Acts. The proposed Hanford Waste Vitrification Plant represents a new source of radioactive air emissions. Construction of the plant will require approval from both federal and state agencies. The Notice of Construction and Application for Approval to Construct the Hanford Waste Vitrification Plant contains information required under Title 40 of the Code of Federal Regulations, Chapter 61; and Chapter 246-247 of the Washington Administrative Code for a proposed new source of radioactive air emissions. The document contents are based on information contained in the Hanford Waste Vitrification Plant Reference Conceptual Design Report, the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report, Revision 0, and subsequent design changes made before August 1, 1992. The contents of this document may be modified to include more specific information generated during subsequent detailed design phases. Modifications will be submitted for regulatory review and approval, as appropriate

  13. Lessons Learned from the On-Site Disposal Facility at Fernald Closure Project

    International Nuclear Information System (INIS)

    Kumthekar, U.A.; Chiou, J.D.

    2006-01-01

    The On-Site Disposal Facility (OSDF) at the U.S. Department of Energy's (DOE) Fernald Closure Project near Cincinnati, Ohio is an engineered above-grade waste disposal facility being constructed to permanently store low level radioactive waste (LLRW) and treated mixed LLRW generated during Decommissioning and Demolition (D and D) and soil remediation performed in order to achieve the final land use goal at the site. The OSDF is engineered to store 2.93 million cubic yards of waste derived from the remediation activities. The OSDF is intended to isolate its LLRW from the environment for at least 200 years and for up to 1,000 years to the extent practicable and achievable. Construction of the OSDF started in 1997 and waste placement activities will complete by the middle of April 2006 with the final cover (cap) placement over the last open cell by the end of Spring 2006. An on-site disposal alternative is considered critical to the success of many large-scale DOE remediation projects throughout the United States. However, for various reasons this cost effective alternative is not readily available in many cases. Over the last ten years Fluor Fernald Inc. has cumulated many valuable lessons learned through the complex engineering, construction, operation, and closure processes of the OSDF. Also in the last several years representatives from other DOE sites, State agencies, as well as foreign government agencies have visited the Fernald site to look for proven experiences and practices, which may be adapted for their sites. This paper present a summary of the major issues and lessons leaned at the Fernald site related to engineering, construction, operation, and closure processes for the disposal of remediation waste. The purpose of this paper is to share lessons learned and to benefit other projects considering or operating similar on-site disposal facilities from our successful experiences. (authors)

  14. Proposal for the award of a contract for the construction of an on-site hostel at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for the construction of an on-site hostel at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the consortium BATIFLEX (GB) - BATINEG (CH), the lowest bidder, for the construction of an on-site hostel at CERN for a total amount of 5 290 000 Swiss francs, not subject to revision. However, for the reasons explained in this document, the Management wishes to request the Finance Committee to give consideration to the approval of a variant to the original specification to allow use to be made of part of an existing building for the reasons detailed in this document, at an additional cost of 350 000 Swiss francs, not subject to revision, bringing the total construction cost to 5 640 000 Swiss francs.

  15. Technical data for concentrated solar power plants in operation, under construction and in project

    Directory of Open Access Journals (Sweden)

    Ugo Pelay

    2017-08-01

    Full Text Available This article presents technical data for concentrated solar power (CSP plants in operation, under construction and in project all over the world in the form of tables. These tables provide information about plants (e.g., name of the CSP plant, country of construction, owner of the plant, aim of the plant and their technical characteristics (e.g., CSP technology, solar power, area of the plant, presence and type of hybridization system, electricity cost, presence and type of TES, power cycle fluid, heat transfer fluid, operating temperature, operating pressure, type of turbine, type and duration of storage, etc.. Further interpretation of the data and discussions on the current state-of-the-art and future trends of CSP can be found in the associated research article (Pelay et al., 2017 [1].

  16. A Neo-Piagetian Theory of Constructive Operators: Applications to Perceptual-Motor Development and Learning.

    Science.gov (United States)

    Todor, John I.

    The author presents an overview of Pascual-Leone's Theory of Constructive Operators, a process-structural theory based upon Piagetian constructs which has evolved to both explain and predict the temporal unfolding of behavior. An application is made of the theory to the demands of a discrete motor task and prediction of (a) the minimal age…

  17. Risk assessment of groundwater environmental contamination: a case study of a karst site for the construction of a fossil power plant.

    Science.gov (United States)

    Liu, Fuming; Yi, Shuping; Ma, Haiyi; Huang, Junyi; Tang, Yukun; Qin, Jianbo; Zhou, Wan-Huan

    2017-12-20

    This paper presents a demonstration of an integrated risk assessment and site investigation for groundwater contamination through a case study, in which the geologic and hydrogeological feature of the site and the blueprint of the fossil power plant (FPP) were closely analyzed. Predictions for groundwater contamination in case of accidents were performed by groundwater modeling system (GMS) and modular three-dimensional multispecies transport model (MT3DMS). Results indicate that the studied site area presents a semi-isolated hydrogeological unit with multiplicity in stratum lithology, the main aquifers at the site are consisted of the filled karst development layer with a thickness between 6.0 and 40.0 m. The poor permeability of the vadose zone at the FPP significantly restricted the infiltration of contaminants through the vadose zone to the subsurface. The limited influence of rarely isotropic porous karstified carbonate rocks on the groundwater flow system premised the simulate scenarios of plume migration. Analysis of the present groundwater chemistry manifested that that the groundwater at the site and the local area are of the HCO 3 -Ca, HCO 3 , and SO 4 -Ca types. A few of the water samples were contaminated by coliform bacteria and ammonia nitrogen as a result of the local cultivation. Prediction results indicate that the impact of normal construction and operation processes on the groundwater environment is negligible. However, groundwater may be partly contaminated within a certain period in the area of leakage from the diesel tanks, the industrial wastewater pool, and the cooling tower water tank in case of accidents. On a positive note, none of the plumes would reach the local sensitive areas for groundwater using. Finally, an anti-seepage scheme and a monitoring program are proposed to safeguard the groundwater protection. The integrated method of the site investigation and risk assessment used in this case study can facilitate the protection of

  18. The motivational safety helmet : Redesign suggestions improving the intrinsic motivation of construction site workers

    NARCIS (Netherlands)

    Beldman, T. (Teunis); Boer, de J. (Johannes); Lemmens, P. (Pim); Stilma, M. (Margot)

    2014-01-01

    In reaction to the lack of intrinsic motivation of construction site workers, to wear their safety helmets at all times, a series of research projects studied causes and possible solutions. Goal is to gain an inspirational discussion to get the design onto the next level. This paper describes a

  19. Gendered Communities of Practice and the Construction of Masculinities in Turkish Physical Education

    Science.gov (United States)

    Atencio, Matthew; Koca, Canan

    2011-01-01

    This paper analyses the construction of masculinities in Turkish physical education through Carrie Paechter's conceptualisation of gendered communities of practice. According to Paechter, educational communities of practice operate as sites of gendered activity. Membership within these communities contributes to the construction of a gendered…

  20. Defense waste management operations at the Nevada Test Site

    International Nuclear Information System (INIS)

    Williams, R.E.; Kendall, E.W.

    1988-01-01

    Waste management activities were initiated at the Nevada Test Site (NTS) to dispose of low-level wastes (LLW) produced by the Department of Energy's (DOE's) weapons testing program. Disposal activities have expanded from the burial of atmospheric weapons testing debris to demonstration facilities for greater-than-Class C (GTCC) waste, transuranic (TRU) waste storage and certification, and the development of a mixed waste (MW) facility. Site specific operational research projects support technology development required for the various disposal facilities. The annual cost of managing the facilities is about $6 million depending on waste volumes and types

  1. Field theoretical construction of an infinite set of quantum commuting operators related with soliton equations

    International Nuclear Information System (INIS)

    Sasaki, Ryu; Yamanaka, Itaru

    1987-01-01

    The quantum version of an infinite set of polynomial conserved quantities of a class of soliton equations is discussed from the point of view of naive continuum field theory. By using techniques of two dimensional field theories, we show that an infinite set of quantum commuting operators can be constructed explicitly from the knowledge of its classical counterparts. The quantum operators are so constructed as to coincide with the classical ones in the ℎ → 0 limit (ℎ; Planck's constant divided by 2π). It is expected that the explicit forms of these operators would shed some light on the structure of the infinite dimensional Lie algebras which underlie a certain class of quantum integrable systems. (orig.)

  2. Field theoretical construction of an infinite set of quantum commuting operators related with soliton equations

    International Nuclear Information System (INIS)

    Sasaki, Ryu; Yamanaka, Itaru.

    1986-08-01

    The quantum version of an infinite set of polynomial conserved quantities of a class of soliton equations is discussed from the point of view of naive continuum field theory. By using techniques of two dimensional field theories, we show that an infinite set of quantum commuting operators can be constructed explicitly from the knowledge of its classical counterparts. The quantum operators are so constructed as to coincide with the classical ones in the ℎ → 0 limit (ℎ; Planck's constant divided by 2π). It is expected that the explicit forms of these operators would shed some light on the structure of the infinite dimensional Lie algebras which underlie certain class of quantum integrable systems. (author)

  3. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    2013-01-11

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.

  4. Construction site workers' malaria knowledge and treatment-seeking pattern in a highly endemic urban area of India.

    Science.gov (United States)

    Shivalli, Siddharudha; Pai, Sudarshan; Akshaya, Kibballi Madhukeshwar; D'Souza, Neevan

    2016-03-16

    Construction sites are potential breeding places for some species of mosquitoes. Construction workers usually stay at the construction sites, thus being extremely susceptible to malaria. For malaria control, a special focus on them is warranted as they often seek treatment from unregulated, private vendors, increasing their risk of exposure to substandard drugs. To elicit the socio-demographic factors associated with comprehensive malaria knowledge (symptoms, mode of spread, and preventive measures) and treatment-seeking pattern (preferred source and type of treatment) among the construction workers in Mangaluru, India; and, to study the association among their comprehensive malaria knowledge, past suffering from malaria (within 1 year) and treatment-seeking pattern. A community based cross-sectional study was conducted in nine randomly selected construction sites of Mangaluru, a high-risk city for malaria with an annual parasite incidence of >2/1000/year, from June-September 2012. A sample size of 132 was estimated assuming at least 30% of them have satisfactory malaria knowledge, 10% absolute precision, 95% confidence level, design effect of 1.5 and 10% non-responses. A semi-structured interview schedule was used, and knowledge scores were computed. Multivariate linear (for knowledge score) and logistic regressions (for preferred source and type of treatment) were applied. One hundred and nineteen workers participated in the study (total approached-138). 85% (n = 101) of them were males. Mean knowledge score was 9.95 ± 3.19 (maximum possible score-16). The majority of them were aware of the symptoms and the mode of malaria transmission. However, workers (β = -0.281, p = 0.001), self stated malaria within 1 year (β = 0.276, p workers (AdjOR 7.21, 95% CI 2.3-22.9) and those with self stated malaria within 1 year (AdjOR 11.21, 95% CI 2.38-52.8) showed favorable treatment-seeking pattern. There is an urgent need of intensifying and streamlining of ongoing malaria

  5. Canonical construction of differential operators intertwining representations of real semisimple Lie groups

    International Nuclear Information System (INIS)

    Dobrev, V.K.

    1986-11-01

    Let G be a real linear connected semisimple Lie group. We present a canonical construction of the differential operators intertwining elementary (≡ generalized principal series) representations of G. The results are easily extended to real linear reductive Lie groups. (author). 20 refs

  6. 47 CFR 25.133 - Period of construction; certification of commencement of operation.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Period of construction; certification of commencement of operation. 25.133 Section 25.133 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period...

  7. Hazard and operability study of the multi-function Waste Tank Facility. Revision 1

    International Nuclear Information System (INIS)

    Hughes, M.E.

    1995-01-01

    The Multi-Function Waste Tank Facility (MWTF) East site will be constructed on the west side of the 200E area and the MWTF West site will be constructed in the SW quadrant of the 200W site in the Hanford Area. This is a description of facility hazards that site personnel or the general public could potentially be exposed to during operation. A list of preliminary Design Basis Accidents was developed

  8. 78 FR 12358 - UBS Financial Services, Inc., Wealth Management Americas Operations, Including On-Site Leased...

    Science.gov (United States)

    2013-02-22

    ..., Inc., Wealth Management Americas Operations, Including On-Site Leased Workers From Leafstone... Services, Inc., Wealth Management Americas Operations (UBS), Weehawken, New Jersey. The workers are engaged... to include all leased workers on-site at UBS Financial Services, Inc., Wealth Management Americas...

  9. Savannah River Site peer evaluator standards: Operator assessment for restart

    International Nuclear Information System (INIS)

    1990-01-01

    Savannah River Site has implemented a Peer Evaluator program for the assessment of certified Central Control Room Operators, Central Control Room Supervisors and Shift Technical Engineers prior to restart. This program is modeled after the nuclear Regulatory Commission's (NRC's) Examiner Standard, ES-601, for the requalification of licensed operators in the commercial utility industry. It has been tailored to reflect the unique differences between Savannah River production reactors and commercial power reactors

  10. Pre operational background radiation monitoring around Kudankulam Nuclear Power Project site - a decade long experience

    International Nuclear Information System (INIS)

    Vijayakumar, B.; George, Thomas; Sundara Rajan, P.; Selvi, B.S.; Balamurugan, M.; Pandit, G.G.; Ravi, P.M.; Tripathi, R.M.

    2014-01-01

    Pre-operational environmental background radiation monitoring around nuclear power plants is very important to understand baseline values existing in the site and also to identify any hot spots of naturally occurring high background radiation areas and their sources. These baseline measurements will act as a benchmark for future comparison after the reactors go into operation. The radiation measurements are continued during the operational phase of the plant and the results are compared to see whether there is any impact of the operation of the plant on the environment. A comprehensive background radiation monitoring plan has been in vogue at site from 2004 to meet this objective. This paper describes the different monitoring strategies adopted around Kudankulam Nuclear Power Project site and throws light on the pre operational background radiation levels in the environment

  11. On the prevailing construction waste recycling practices: a South East Queensland study.

    Science.gov (United States)

    Tam, Vivian W Y; Kotrayothar, Duangthidar; Loo, Yew-Chaye

    2009-03-01

    Waste generated from construction and building demolition work constitutes about 68% of all solid waste generated each year in South East Queensland. Consequently, it has created a serious waste management problem. The State Governments of Victoria and New South Wales have been encouraging the use of recycled materials from construction and related waste; they have also promulgated specifications for their use. In Queensland, however, similar regulations are not anticipated in the near future, which explains the lack of funded research conducted in this important arena. This paper presents an evaluation of the prevailing waste recycling practices in Queensland. Nine sites were visited, including two construction sites, three demolition sites, three recycling plants and one landfill in South East Queensland. The difficulties encountered by the recycling programme operators and their associates at these sites are described and the benefits of recycling construction materials are presented. One of the major barriers is that the local councils disallow the use of recycled materials in new construction work. To help rectify these impediments to recycling, recommendations are given to increase the use of recycled construction waste in South East Queensland.

  12. Advanced plant engineering and construction of Japanese ABWRs

    International Nuclear Information System (INIS)

    Gotoh, N.; Sumikawa, J.; Yoshida, N.; Yoshida, M.

    1998-01-01

    Remarkable improvement has been made in recent nuclear power plant design and construction in Japan. These many improved engineering technologies has been made a good use in the lately commercial operated two world's first 1,356MWe ABW's (Advanced Boiling Water Reactors), and made a great contribution to the smooth progress and the completion of a highly reliable plant construction. Especially, two engineering technologies, (1), three-dimensional computer aided design system through engineering data-base, and (2), large scale modularising construction method, have been successfully applied as the integrated engineering technologies of the plant construction. And two integrated reviews, 'integrated design review, confirmation of new and changed design and prevention of failure recurrence' in the design stage, and 'constructing plant review' at the site, have been widely and systematically conducted as a link in the chain of steady reliability improvement activities. These advanced and/or continuous and steady technologies are one of most important factors for high reliability through the entire lifetime of a nuclear plant, including planning, design, construction, operation and maintenance stages. (author)

  13. Operational Work System Design and Staff Performance in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Emmanuel Ejikeme Isichei

    2017-03-01

    Full Text Available Objective: The study investigated the impact of operational work system design on staff performance in selected construction firms in Nigeria. Research Design & Methods: The study used primary data gathered with the use of a 5-point Likert scale questionnaire format administered to 138 respondents. A hypothesis was postulated to test the significance of the research problem. Data analysis was carried out using correlation and multiple regression analysis which proved the significance of the alternative hypothesis as a result of testing the hypothesis. Findings: The findings show that there is a significant relationship between operational work system design and staff performance. The study concludes that operational job design can be advanced as a motivation tool, which is non-monetary in nature, to improve staff performance. Implications & Recommendations: A key drive to improve performance is the satisfaction of staff coupled with an outstanding operational job design which takes into consideration the total physical and mental well-being of staff and its interaction with other organisational factors. The study recommends, among others, that there should be active participation of staff in the design of work in the organisation. Contribution & Value Added: The study provides an empirical approach to enhancing performance in the construction industry and thereby developing an indigenous firm to compete favourably on a growing market.

  14. Unmanned aerial vehicles in construction and worker safety.

    Science.gov (United States)

    Howard, John; Murashov, Vladimir; Branche, Christine M

    2018-01-01

    Applications of unmanned aerial vehicles (UAVs) for military, recreational, public, and commercial uses have expanded significantly in recent years. In the construction industry, UAVs are used primarily for monitoring of construction workflow and job site logistics, inspecting construction sites to assess structural integrity, and for maintenance assessments. As is the case with other emerging technologies, occupational safety assessments of UAVs lag behind technological advancements. UAVs may create new workplace hazards that need to be evaluated and managed to ensure their safe operation around human workers. At the same time, UAVs can perform dangerous tasks, thereby improving workplace safety. This paper describes the four major uses of UAVs, including their use in construction, the potential risks of their use to workers, approaches for risk mitigation, and the important role that safety and health professionals can play in ensuring safe approaches to the their use in the workplace. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  15. Siting history and current construction status of disposal facility for low and intermediate level radioactive waste in Korea

    International Nuclear Information System (INIS)

    Sakai, Akihiro; Kikuchi, Saburo; Maruyama, Masakatsu

    2008-01-01

    Korean government decided disposal site for low and intermediate level radioactive waste (LILW), which is located at coastal area near the Wolsong nuclear power plants in Gyeong-Ju city in December. 2005, based on the result of votes of residents in four candidate sites. Since then, Korea Hydro and Nuclear Power Co., Ltd (KHNP), which is the management company of the LILW disposal facility, has carried out the preparation for construction of disposal facility and its licensing process. At the first phase, 100 thousand drums in 200 liter are planned to be disposed of in the rock cavern type disposal facility located at the depth from 80m to 130m below the sea level, and finally 800 thousand drums in 200 liter are planned to be disposed of in the site. This report shows the history of siting for the LILW disposal, the outline of design of disposal facility and current status of its construction, based on the information which was obtained mainly during our visit to the disposal site in Korea. (author)

  16. Application of a Coupled Eulerian-Lagrangian Technique on Constructability Problems of Site on Very Soft Soil

    Directory of Open Access Journals (Sweden)

    Junyoung Ko

    2017-10-01

    Full Text Available This paper presents the application of the Coupled Eulerian–Lagrangian (CEL technique on the constructability problems of site on very soft soil. The main objective of this study was to investigate the constructability and application of two ground improvement methods, such as the forced replacement method and the deep mixing method. The comparison between the results of CEL analyses and field investigations was performed to verify the CEL modelling. The behavior of very soft soil and constructability with methods can be appropriately investigated using the CEL technique, which would be useful tools for comprehensive reviews in preliminary design.

  17. Rocketdyne Propulsion and Power DOE Operations annual site environmental report 1997

    International Nuclear Information System (INIS)

    Robinson, K.S.

    1998-01-01

    This annual report discusses environmental monitoring at two manufacturing and test sites operated in the Los Angeles area by Rocketdyne Propulsion and Power of Boeing North American, Inc. These are identified as Area 4 of the SSFL and the De Soto site. These sites have been used for research and development (R and D), engineering, and testing in a broad range of technical fields primarily in energy research and nuclear reactor technology. The De Soto site had research and development laboratories involved with nuclear research. This work was terminated in 1995 and only D and D activities will have potential for impact on the environment. Since 1956, Area 4 has been used for work with nuclear materials, including fabricating nuclear reactor fuels, testing nuclear reactors, and dissembling used fuel elements. This work ended in 1988 and subsequent efforts have been directed toward decommissioning and decontamination of the former nuclear facilities. The primary purpose of this report is to present information on environmental and effluent monitoring of DOE-sponsored activities to the regulatory agencies responsible for oversight. Information presented here concentrates on Area 4 at SSFL, which is the only area at SSFL where DOE operations were performed

  18. Simulation of value stream mapping and discrete optimization of energy consumption in modular construction

    Science.gov (United States)

    Chowdhury, Md Mukul

    With the increased practice of modularization and prefabrication, the construction industry gained the benefits of quality management, improved completion time, reduced site disruption and vehicular traffic, and improved overall safety and security. Whereas industrialized construction methods, such as modular and manufactured buildings, have evolved over decades, core techniques used in prefabrication plants vary only slightly from those employed in traditional site-built construction. With a focus on energy and cost efficient modular construction, this research presents the development of a simulation, measurement and optimization system for energy consumption in the manufacturing process of modular construction. The system is based on Lean Six Sigma principles and loosely coupled system operation to identify the non-value adding tasks and possible causes of low energy efficiency. The proposed system will also include visualization functions for demonstration of energy consumption in modular construction. The benefits of implementing this system include a reduction in the energy consumption in production cost, decrease of energy cost in the production of lean-modular construction, and increase profit. In addition, the visualization functions will provide detailed information about energy efficiency and operation flexibility in modular construction. A case study is presented to validate the reliability of the system.

  19. Characterization Report Operational Closure Covers for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    International Nuclear Information System (INIS)

    Bechtel Nevada Geotechnical Sciences

    2005-01-01

    Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS) for the U.S. Department of Energy (DOE) National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The Area 3 RWMS is located in south-central Yucca Flat and the Area 5 RWMS is located about 15 miles south, in north-central Frenchman Flat. Though located in two separate topographically closed basins, they are similar in climate and hydrogeologic setting. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste, while the Area 3 RWMS uses subsidence craters formed from underground testing of nuclear weapons for the disposal of packaged and unpackaged bulk waste. Over the next several decades, most waste disposal units at both the Area 3 and Area 5 RWMSs are anticipated to be closed. Closure of the Area 3 and Area 5 RWMSs will proceed through three phases: operational closure, final closure, and institutional control. Many waste disposal units at the Area 5RWMS are operationally closed and final closure has been placed on one unit at the Area 3 RWMS (U-3ax/bl). Because of the similarities between the two sites (e.g., type of wastes, environmental factors, operational closure cover designs, etc.), many characterization studies and data collected at the Area 3 RWMS are relevant and applicable to the Area 5 RWMS. For this reason, data and closure strategies from the Area 3 RWMS are referred to as applicable. This document is an interim Characterization Report - Operational Closure Covers, for the Area 5 RWMS. The report briefly describes the Area 5 RWMS and the physical environment where it is located, identifies the regulatory requirements, reviews the approach and schedule for closing, summarizes the monitoring programs, summarizes characterization studies and results, and then presents conclusions and recommendations

  20. STABILITY CONTROL OF ELEVATING-TRANSFER VEHICLES IN THE CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Zhadanovskiy Boris Vasil’evich

    2016-05-01

    Full Text Available The underground space is widely used in the construction in big cities of the Russian Federation. These works need the use of elevating-transfer vehicles. In this case the requirements of norms and regulations on operating safety should be strictly observed, because their breach often leads to emergency situations and injuries. The organizational and technological solutions when developing the design documentation and executing construction and assembly works should be primarily based on the stability of lifting facilities. The author states the requirements to installation of lifting tackles (cranes. The features of their installation in different operation conditions on construction sites are described. The crane stability depends on many different indicators, which are considered by the author. The calculation algorithms of crane stability are offered.

  1. Construction and operation of a covered lagoon methane recovery system for the Cal Poly Dairy

    International Nuclear Information System (INIS)

    Williams, D.W.; Moser, M.A.; Norris, G.

    1999-01-01

    This paper describes the design, construction and anticipated operation of a lagoon-type methane recovery system for the Cal Poly Dairy. The initial design was based upon the present and anticipated herd size, 300 to 600 cows, heifers and calves. The lagoon design meets USDA-NRCS standards, and accounts for limitations of the site, primarily shallow sandstone bedrock. The new lagoon, which has a liquid volume of 14,000 m 3 , was constructed next to an existing lagoon. The new lagoon was covered with a flexible membrane incorporating buoyant material so that the cover floats on the surface, and a gas collection system. The predicted output of the lagoon for the present population of approximately 350 cows, heifers and calves is estimated to average up to 320 m 3 of biogas per day. The biogas will fuel a micro-turbine electric generator, and produce up to 23 kW in parallel with the utility system. Odor control is the most important non-economic benefit. This project will provide environmental benefits-odor control by capturing the odorous gases that result from dairy manure storage; methane, a significant greenhouse gas is kept out of the atmosphere; and water pollution is reduced through the reduction in organic matter in the lagoon. Economic benefits include electricity and process heat, together worth up to 16,000 US dollars per year. (author)

  2. Self-reliance and innovation to improve the localization ability of nuclear power construction

    International Nuclear Information System (INIS)

    Wu Chongming

    2008-01-01

    Construction is a crucial link in the course of design, site selection, construction and operation for a nuclear power plant. The quality during construction directly affects the nuclear safety. And the construction quality involves various aspects including quality culture, feasibility of construction technique, quality assurance, and quality control. Through technical management innovation, great achievements have been made in the civil construction of Unit 3 of Qinshan II Extension Project. As a result, the construction period was shortened and the concrete quality reached the fairfaced concrete standard. (authors)

  3. Building technology on construction site of nuclear power plant at Zaporozh'e

    Energy Technology Data Exchange (ETDEWEB)

    Dusek, R; Matyas, V [Vodni Stavby, Prague (Czechoslovakia)

    1981-12-01

    Basic data and technical and economic indexes are shown for a WWER 1000 nuclear power plant being built 120 km off Zaporozh'e (USSR). The schedule of construction and the choice of the means of mechanization used for building work are reported. Discussed are building machines used, the location of assembly cranes of the main unit, the design and the building technology of the reactor part, the engine house, deisel generator station, the special operations building, the use of concrete and steel units in the building, and the procurement of materials for the construction. The knowledge gained from the building of the power plant will be applied in the CSSR in the building of 1000 MW unit power plants.

  4. Operational Strategies for Low-Level Radioactive Waste Disposal Site in Egypt - 13513

    International Nuclear Information System (INIS)

    Mohamed, Yasser T.

    2013-01-01

    The ultimate aims of treatment and conditioning is to prepare waste for disposal by ensuring that the waste will meet the waste acceptance criteria of a disposal facility. Hence the purpose of low-level waste disposal is to isolate the waste from both people and the environment. The radioactive particles in low-level waste emit the same types of radiation that everyone receives from nature. Most low-level waste fades away to natural background levels of radioactivity in months or years. Virtually all of it diminishes to natural levels in less than 300 years. In Egypt, The Hot Laboratories and Waste Management Center has been established since 1983, as a waste management facility for LLW and ILW and the disposal site licensed for preoperational in 2005. The site accepts the low level waste generated on site and off site and unwanted radioactive sealed sources with half-life less than 30 years for disposal and all types of sources for interim storage prior to the final disposal. Operational requirements at the low-level (LLRW) disposal site are listed in the National Center for Nuclear Safety and Radiation Control NCNSRC guidelines. Additional procedures are listed in the Low-Level Radioactive Waste Disposal Facility Standards Manual. The following describes the current operations at the LLRW disposal site. (authors)

  5. Planning, Investment, Construction and Operation of Rail Transit in Beijing

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    In Beijing, the rail transit firstly came into existence in the mid 1960s and was officially put into operation for civil use in the early 1980s. It has entered a period of rapid development since 2001, with thanks to the coming of the Olympic Games in 2008, and has been playing a more and more important role in the passenger transport of Beijing since then on, as a key part of the public transportation. Based on a resume on the evolution of rail transit development in Beijing, this paper analyzes the mechanism of policy-making, the mode of investment and financing, the procedure of construction, and the management of operation of rail transit, all of which ensure its rapid development and effective performance.

  6. Safety management system during rock blasting at FRFCF construction site

    International Nuclear Information System (INIS)

    Vijayakumaran, C.; Kandasamy, S.; Satpathy, K.K.

    2016-01-01

    Blasting is an important activity during rock excavation to reach required depth for obtaining stability of the civil structure. For the construction of various Plant Buildings of Fast Reactor Fuel Cycle Facility (FRFCF), IGCAR at Kalpakkam, based on the geological survey it is required to reach a depth of 21.4 meters from existing ground level. This paper details about the procedures and precaution adopted during the rock blasting activities at FRFCF site. The volume of rock removed by blasting was 3 lakh cubic meters. The total number of blasting carried out was 304 using 105.73 tons of blasting material. The entire blasting work could be completed within 174 days without any incident. (author)

  7. Environmental Assessment Use of Existing Borrow Areas, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    2001-01-01

    The U.S. Department of Energy (DOE) operates the Hanford Site near Richland, Washington. The DOE needs to identify and operate onsite locations for a continued supply of raw aggregate materials [approximately 7,600,000 cubic meters (10,000,000 cubic yards) over the next 10 years] for new facility construction, maintenance of existing facilities and transportation corridors, and fill and capping material for remediation and other sites

  8. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    Energy Technology Data Exchange (ETDEWEB)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J. [CH2M HILL Plateau Remediation Company, P.O. Box 1600, MSIN R4-41, 99352 (United States)

    2013-07-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

  9. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    International Nuclear Information System (INIS)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    2013-01-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

  10. Construction and operation of an industrial solid waste landfill at Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The US Department of Energy (DOE), Office of Waste Management, proposes to construct and operate a solid waste landfill within the boundary of the Portsmouth Gaseous Diffusion Plant (PORTS), Piketon, Ohio. The purpose of the proposed action is to provide PORTS with additional landfill capacity for non-hazardous and asbestos wastes. The proposed action is needed to support continued operation of PORTS, which generates non-hazardous wastes on a daily basis and asbestos wastes intermittently. Three alternatives are evaluated in this environmental assessment (EA): the proposed action (construction and operation of the X-737 landfill), no-action, and offsite shipment of industrial solid wastes for disposal.

  11. Construction and operation of an industrial solid waste landfill at Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    International Nuclear Information System (INIS)

    1995-10-01

    The US Department of Energy (DOE), Office of Waste Management, proposes to construct and operate a solid waste landfill within the boundary of the Portsmouth Gaseous Diffusion Plant (PORTS), Piketon, Ohio. The purpose of the proposed action is to provide PORTS with additional landfill capacity for non-hazardous and asbestos wastes. The proposed action is needed to support continued operation of PORTS, which generates non-hazardous wastes on a daily basis and asbestos wastes intermittently. Three alternatives are evaluated in this environmental assessment (EA): the proposed action (construction and operation of the X-737 landfill), no-action, and offsite shipment of industrial solid wastes for disposal

  12. Federal environmental standards of potential importance to operations and activities at US Department of Energy sites. Draft

    Energy Technology Data Exchange (ETDEWEB)

    Fowler, K.M.; Bilyard, G.R.; Davidson, S.A.; Jonas, R.J.; Joseph, J.

    1993-06-01

    The US Department of Energy (DOE) is now engaged in a program of environmental restoration nationwide across its 45 sites. It is also bringing its facilities into compliance with environmental regulations, decontaminating and decommissioning unwanted facilities, and constructing new waste management facilities. One of the most difficult questions that DOE must face in successfully remediating its inactive waste sites, decontaminating and decommissioning its inactive facilities, and operating its waste management facilities is: ``What criteria and standards should be met?`` Acceptable standards or procedures for determining standards will assist DOE in its conduct of ongoing waste management and pending cleanup activities by helping to ensure that those activities are conducted in compliance with applicable laws and regulations and are accepted by the regulatory community and the public. This document reports on the second of three baseline activities that are being conducted as prerequisites to either the development of quantitative standards that could be used by DOE, or consistent procedures for developing such standards. The first and third baseline activities are also briefly discussed in conjunction with the second of the three activities.

  13. Origins, and the construction, commissioning and operation of the SRS

    International Nuclear Information System (INIS)

    Thompson, D.J.

    1985-01-01

    The SRS was initiated in 1973 and approved in 1975. It came into use in 1981. The paper describes the organizational framework at the different stages, the pre-approval, construction, commissioning and operational phases of the storage ring, the build-up of experimental stations, and future plans. The emphasis is on lessons which can be learned by those about to embark on such a project, rather than on a detailed historical account, and on managerial rather than physics matters

  14. Remedial investigation for the 200-BP-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Buckmaster, M.A.

    1991-01-01

    The Hanford Site, Richland, Washington, contains over 1500 identified waste sites that will be characterized and remediated over the next 30 years. In support of the ''Hanford Federal Facility Agreement and Consent Order,'' the US Department of Energy has initiated a remedial investigation/feasibility study (RI/FS) at the 200-BP-1 operable unit. The 200-BP-1 RI is the first Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation on the Hanford Site that involves drilling into highly radioactive and chemically contaminated soils. The initial phase of the site characterization is oriented toward determining the nature and extent of any contamination present in the vicinity of the 200-BP-1 operable unit. The major focus of the Phase I RI is the drilling and sampling of 10 inactive waste disposal units which received low level radioactive liquid waste

  15. Classification and Construction of Invertible Linear Differential Operators on a One-Dimensional Manifold

    Directory of Open Access Journals (Sweden)

    V. N. Chetverikov

    2014-01-01

    Full Text Available Invertible linear differential operators with one independent variable are investigated. The problem of description of such operators is important, because it is connected with transformations and the classification of control systems, in particular, with the flatness problem.Each invertible linear differential operator represents a square matrix of scalar differential operators. Its product with an operator-column is an operator-column whose order does not exceed the sum of orders of initial operators. The operators-columns, the product with which leads to order fall, i.e. the order of the product is less than sum of orders of factors, are interesting for the description of invertible operators. In this paper the classification of invertible operators is based on dimensions dk,p of intersections of modules Gp and Fk for various k and p, where Gp is the module of all operators-columns of order not above p, and Fk is the module of compositions of the invertible operator with all operators-columns of order not above k. The invertible operators that have identical sets of numbers dk,p form one class.In the paper the general properties of tables of numbers dk,p for invertible operators are investigated. A correspondence between invertible operators and elementary-geometrical models which in the paper are named by d-schemes of squares is constructed. The invertible operator is ambiguously defined by its d-scheme of squares. The mathematical structure that must be set for its unique definition and an algorithm for the construction of the invertible operator are offered.In the proof of the main result, methods of the theory of chain complexes and their spectral sequences are used. In the paper all necessary concepts of this theory are formulated and the corresponding facts are proved.Results of the paper can be used for solving problems in which invertible linear differential operators are arisen. Namely, it is necessary to formulate the conditions on

  16. Radioactive air emissions notice of construction portable/temporary radioactive air emission units - August 1998

    International Nuclear Information System (INIS)

    FRITZ, D.W.

    1999-01-01

    This notice of construction (NOC) requests a categorical approval for construction and operation of three types of portable/temporary radionuclide airborne emission units (PTRAEUs). These three types are portable ventilation-filter systems (Type I), mobile sample preparation facilities (Type II), and mobile sample screening and analysis facilities (Type III). Approval of the NOC application is intended to allow construction and operation of the three types of PTRAEUs without prior project-specific approval. Environmental cleanup efforts on the Hanford Site often require the use of PTRAEUs. The PTRAEUs support site characterization activities, expedited response actions (ERAs), sampling and monitoring activities, and other routine activities. The PTRAEUs operate at various locations around the Hanford Site. Radiation Air Emissions Program, Washington Administrative Code (WAC) 246-247, requires that the Washington State Department of Health (WDOH) be notified before construction of any new emission that would release airborne radioactivity. The WDOH also must receive notification before any modification of an existing source. This includes changes in the source term or replacement of emission control equipment that might significantly contribute to the offsite maximum dose from a licensed facility. During site characterization activities, ERAs, sampling and monitoring activities, and other routine activities, the PTRAEUs might require startup immediately. The notification period hampers efforts to complete such activities in an effective and timely manner. Additionally, notification is to be submitted to the WDOH when the PTRAEUs are turned off. The U.S. Department of Energy, Richland Operations Office (DOE-RL) potentially could generate several notifications monthly. The WDOH would be required to review and provide approval on each NOC as well as review the notices of discontinued sources. The WDOH regulation also allows facilities the opportunity to request a

  17. Geomorphologic specificities of selected sites for nuclear power plants in Czechoslovakia

    International Nuclear Information System (INIS)

    Kalvoda, J.; Demek, J.

    1991-01-01

    The contribution of geomorphology to the complex evaluation of properties of sites for the construction and operation of nuclear facilities is demonstrated. The unique manifestation of the present geodynamics at the Jaslovske Bohunice nuclear power plant locality and the spatial correlations of annals of the specific morphotectonic development of georeliefs of that nuclear power plant with the location of the epicentral earthquake zones are shown. The results of the geomorphological survey in the surroundings of the Temelin nuclear power plant construction site are described and a drawing is reproduced showing how the georelief of this locality divides into areas with different categories of occurrence of morpho-structural formations. For the Tetov locality, where the construction of a nuclear power plant is planned, the changes in the course of the Labe (Elbe) river which occurred in the Pleistocene are of importance in the assessment of the intensity of geodynamic processes. The geomorphological and geotectonic complexity of the planned Blahutovice nuclear power plant construction site is demonstrated. A drawing shows the morphotectonic situation in the surroundings of that construction site. (Z.S.). 4 figs

  18. Advanced boiling water reactor (ABWR). Design, construction, operation and maintenance experience

    International Nuclear Information System (INIS)

    Idesawa, M.

    1998-01-01

    The ABWR has experienced all phases of design, construction, operation and maintenance at Kashiwazaki-Kariwa Nuclear Power Station Units No.6 and 7 and confirmed that originally intended development targets have been achieved with highly satisfactory results. This is the fruit of a project that collected wisdom from various sources under a international cooperative organization, with Tokyo Electric Power Company taking the leading role from the onset. These two units have not only demonstrated that ABWRs have superior performance as the first standard units of advanced light water reactor but also aroused a hope for the big potential advantages that ABWRs can provide us. The ABWR has already been awarded a U.S. standard license for having proved that it can comply with the requirements of international regulatory systems with an ample margin. There are also many construction programs with ABWRs progressing both domestically and abroad, suggesting that it has won recognition as an international standard plant. We will do our utmost to perfect the operation and maintenance records of Kashiwazaki-Kariwa Units No.6 and 7, which is the top runner among ABWRs, and to make known the superiority of this reactor to the world. (J.P.N.)

  19. Construct validity in Operations Management by using Rasch Measurement Theory. The case of the construct “motivation to implement continuous improvement"

    Directory of Open Access Journals (Sweden)

    Lidia Sanchez-Ruiz

    2016-12-01

    Full Text Available Construct design and validation is a common practise in the Operations Management field. In this sense, the aim of this study is to present Rasch Measurement Theory (RMT as richful and useful methodology in order to validate constructs. In order to do so, the measurement controversy in the social science is presented; then, RMT is explained as a solution for this measurement issue; after that, the different applications of RMT are described and, finally, the different stages of the validation process are presented. Thus, this work aims to serve as a guide for those researchers interested in the methodology. Therefore, a specific case is included: the validation of the construct “motivation to implement continuous improvement”.

  20. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  1. Design, construction and operation of Ontario Hydro's CANDU plants

    International Nuclear Information System (INIS)

    Campbell, P.G.

    1981-06-01

    Ontario Hydro has been producing electricity commercially from nuclear power since 1968, using CANDU reactors which have proved enormously successful. The 206-MW Douglas Point station, nearly 10 times larger than the first Canadian power reactor, NPD-2, resulted from a cooperative effort between Atomic Energy of Canada Ltd., the provincial government of Ontario, and Ontario Hydro. This approach led to a basic working relationship between the parties, with Ontario Hydro acting as project manager and builder, and AECL acting as consultant with respect to the nuclear components. Before Douglas Point was fully commissioned Ontario Hydro was ready to commit itself to more nuclear stations, and work was started on the four-unit Pickering nuclear generating station. Multi-unit stations were adopted to achieve economies of scale, and the concept has been retained for all subsequent nuclear power plants constructed in the province. The organization of Ontario Hydro's project management, construction, and operation of nuclear generating stations is described. Performance of the existing stations and cost of the power they produce have been entirely acceptable

  2. Denver Radium Site -- Operable Unit I closeout report for the US Environmental Protection Agency

    International Nuclear Information System (INIS)

    1992-08-01

    The Denver Radium Site consists of properties in the Denver, Colorado, area having radioactive contamination left from radium processing in the early 1900s. The properties are divided into 11 gaps or operable units to facilitate remedial action of the Site. Operable Unit I is an 8-acre block bounded by Quivas Street to the east, Shoshone Street to the west, West 12th Avenue to the south, and West 13th Avenue to the north. The primary focus of interest concerning investigations of radiological contamination was a radium, vanadium, and uranium processing facility at 1201 Quivas Street owned by the Pittsburgh Radium Company (PRC) from 1925 until 1926. The Radium Ores Company, which was associated with PRC, operated the facility until 1927. A Remedial investigation (RI) of Operable Unit I was prepared by Jacobs Engineering Group and CH 2 M Hill on behalf of EPA in April 1986. The draft Feasibility Study (FS), prepared by Jacobs Engineering Group and CH 2 M Hill, was issued in July 1987 (the final FS is the Community Relations Responsiveness Summary with an errata to the draft, issued September 1987). The RI focused on radium uranium processing residues discarded in the early 1900s. These residues contained uranium, radium, and thorium. EPA s Community Relations Plan involved the community in the decision-making process relating to the remedy to be implemented at Operable Unit X, and promoted communications among interested parties throughout the course of the project. The remedial action alternative preferred by EPA for Operable Unit I was Off-Site Permanent Disposal. Because a permanent disposal facility was not available at the time the Record of Decision was issued in September 1987, EPA selected the On-Site Temporary Containment (capping) with the Off-Site Permanent Disposal alternative

  3. History of Hanford Site Defense Production (Brief)

    Energy Technology Data Exchange (ETDEWEB)

    GERBER, M S

    2001-02-01

    This paper acquaints the audience with the history of the Hanford Site, America's first full-scale defense plutonium production site. The paper includes the founding and basic operating history of the Hanford Site, including World War II construction and operations, three major postwar expansions (1947-55), the peak years of production (1956-63), production phase downs (1964-the present), a brief production spurt from 1984-86, the end of the Cold War, and the beginning of the waste cleanup mission. The paper also delineates historical waste practices and policies as they changed over the years at the Hanford Site, past efforts to chemically treat, ''fractionate,'' and/or immobilize Hanford's wastes, and resulting major waste legacies that remain today. This paper presents original, primary-source research into the waste history of the Hanford Site. Finally, the paper places the current Hanford Site waste remediation endeavors in the broad context of American and world history.

  4. History of Hanford Site Defense Production (Brief)

    International Nuclear Information System (INIS)

    GERBER, M.S.

    2001-01-01

    This paper acquaints the audience with the history of the Hanford Site, America's first full-scale defense plutonium production site. The paper includes the founding and basic operating history of the Hanford Site, including World War II construction and operations, three major postwar expansions (1947-55), the peak years of production (1956-63), production phase downs (1964-the present), a brief production spurt from 1984-86, the end of the Cold War, and the beginning of the waste cleanup mission. The paper also delineates historical waste practices and policies as they changed over the years at the Hanford Site, past efforts to chemically treat, ''fractionate,'' and/or immobilize Hanford's wastes, and resulting major waste legacies that remain today. This paper presents original, primary-source research into the waste history of the Hanford Site. Finally, the paper places the current Hanford Site waste remediation endeavors in the broad context of American and world history

  5. Legal preconditions for the construction and operation of district gas mains

    Energy Technology Data Exchange (ETDEWEB)

    Joachim, H

    1977-06-01

    The course of procedure in connection with the construction of district gas mains is outlined. This includes acquisition of main rights under private law and expropriation law, special problems such as peculiarities of land or landscape, road crossings, facilities of the Federal railway, agriculture etc., operational problems such as protection zones, building territories within the area of the main layout, drainage effects, high-pressure pipes, etc.

  6. Overview of Low-Level Waste Disposal Operations at the Nevada Test Site

    International Nuclear Information System (INIS)

    2007-01-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Environmental Management Program is charged with the responsibility to carry out the disposal of on-site and off-site generated low-level radioactive waste at the Nevada Test Site. Core elements of this mission are ensuring that disposal take place in a manner that is safe and cost-effective while protecting workers, the public, and the environment. This paper focuses on giving an overview of the Nevada Test Site facilities regarding currant design of disposal. In addition, technical attributes of the facilities established through the site characterization process will be further described. An update on current waste disposal volumes and capabilities will also be provided. This discussion leads to anticipated volume projections and disposal site requirements as the Nevada Test Site disposal operations look towards the future

  7. The method of using current regulations and standards in designing management and technologies of construction

    Directory of Open Access Journals (Sweden)

    Sinenko Sergey

    2017-01-01

    Full Text Available Economic efficiency of using funds in construction of buildings and structures begins from an effective, proper design, which is based on modern, cutting-edge, advanced equipment, streamlined organization and process solutions of construction operations. In the light of this it is considered application of “Self-Organization and Technology of Building” multifunctional software package capable of solving various engineering tasks on designing management of construction operations in accordance with the applicable rules and regulations in view of using software for automatic generation of workflow. Implementing this software in the construction management processes may help to solve management tasks at the construction site.

  8. A Market Equilibrium Supply Chain Model for Supporting Self-Manufacturing or Outsourcing Decisions in Prefabricated Construction

    OpenAIRE

    Yanhu Han; Miroslaw J. Skibniewski; Lufan Wang

    2017-01-01

    Prefabricated construction is a sustainable alternative to traditional on-site construction methods. However, many challenges still exist in the prefabricated construction process. For example, self-manufacturing or outsourcing decisions are vital to the industrial structure and organization of the prefabricated construction industry, and the company’s production and operation decision-making. This paper considers a prefabricated construction supply chain, which is composed of one upstream co...

  9. HUG sets up an emergency operations centre on the CERN site

    CERN Multimedia

    Antonella Del Rosso

    2015-01-01

    Discussions between CERN and the Hôpitaux universitaires de Genève (HUG), under the aegis of the Swiss authorities, have resulted in the setting-up of an emergency operations centre on the CERN site. This will be the operations base for an emergency doctor, a medical emergency vehicle and a driver. Located on the Swiss part of the Meyrin site, close to Building 57, it will be inaugurated on 20 May.   SMUR team based at CERN. CERN’s medical staff and fire-fighters dispense first aid but in medical emergencies they are obliged to call on outside services to treat and transfer patients to hospital. In the Canton of Geneva, this service is provided by HUG via the 144 emergency line. But HUG is based on the eastern side of Geneva, a long way from CERN, and response times can be substantial. In order to improve the safety of the growing number of people on the site, CERN asked Switzerland, as one of its Host States, to help it reduce the medical emergency response t...

  10. Coaching at the Building Site – A Feasibility Study

    DEFF Research Database (Denmark)

    Koch, Christian; Alsdorf, Morten; Sander, Dag

    2006-01-01

    successfully at a building site, in certain specific situations. The feeling of security is important for the focus persons at the building site and is best obtained in the open air. The way the leader acts towards the employee/focus person is decisive. Consciousness and responsibility is developed......Coaching has become widely used in business, and is well described. However it is rarely used in construction. This makes a contrast to the poor performance of site interaction, leading to a vast amount of reported cooperation and coordination problems. This paper investigates the feasibility...... observations in a building site operating with lean construction, where the managers did not use coaching consciously in their interaction with employees. 29 participant observations of five of the managers at the building site were carried out, at individual- and group meetings. Coaching can be used...

  11. Risk factors for cardiovascular diseases among male workers of building construction site in Delhi

    Directory of Open Access Journals (Sweden)

    Mamta Parashar

    2017-01-01

    Full Text Available Background: Cardiovascular disease (CVD is mainly attributable to a combination of risk factors (RFs: tobacco use, alcohol use, high blood pressure, diabetes, unhealthy diet, and obesity which are amenable to interventions. Building construction workers are poor and vulnerable. They are also the victims of adverse working environmental conditions and subjected to health hazards of occupational origin. Objective: The aim was to study the RFs and associated sociodemographics for CVD among construction site workers. Materials and Methods: This cross-sectional study was conducted among construction site workers. A total of 172 male workers over the age of 18 years were included in the study. Modified World Health Organization Step-wise approach to chronic disease RF surveillance was used to collect data. The data were analyzed in SPSS version 17 and the Chi-square test was applied to analyze the qualitative data. Results: At least one RF for CVD was present in all the subjects, with majority (93.6% of them having at least two RFs. The presence of the RFs (moderate to high, 3–11 was found to be significantly associated with lower income group, unskilled workers, migration year <1, alcoholics, personal tobacco use, family history of tobacco use, and the low knowledge score regarding tobacco use (0–2. Conclusions: Community-based comprehensive behavioral and life style communication package should be established for workers to reduce the modifiable RFs of CVD.

  12. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site. Annual report, FY-1994 and FY-1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    The Savannah River Ecology Laboratory initiated ecological studies related to the construction of the DWPF on the SRS in FY-1979. Two areas have been used for biological surveys and long-term monitoring: the DWPF construction site (S-Area and Z-Area), and two control sites (Rainbow Bay and Tinker Creek). The Rainbow Bay study area and S-Area are located within 5 km of each other on the SRS, and both once contained Carolina bays which were very similar ecologically. One goal of the SREL`s faunal studies is to compare the natural variation in amphibian populations at the Rainbow Bay control site to the variation observed at the human-altered site (Sun Bay, formerly on the DWPF construction site). Pre-construction biological surveys included data on vegetation, birds, mammals, amphibians, reptiles, fish and several invertebrate groups. No species on the Federal Endangered or Threatened lists were found on either site, but several plants and animals of threatened or special-concern status in South Carolina were present and the gopher frog (Rana areolata) currently is being considered for federal listing. Continuing studies are directed towards assessing construction impacts on the biota and towares modeling the effects of alteration of wetland hydroperiod on the biota. Primary emphasis is being paced on evaluation the effectiveness of mitigation measures undertaken by DOE.

  13. Equivalent construction of the infinitesimal time translation operator in algebraic dynamics algorithm for partial differential evolution equation

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    We give an equivalent construction of the infinitesimal time translation operator for partial differential evolution equation in the algebraic dynamics algorithm proposed by Shun-Jin Wang and his students. Our construction involves only simple partial differentials and avoids the derivative terms of δ function which appear in the course of computation by means of Wang-Zhang operator. We prove Wang’s equivalent theorem which says that our construction and Wang-Zhang’s are equivalent. We use our construction to deal with several typical equations such as nonlinear advection equation, Burgers equation, nonlinear Schrodinger equation, KdV equation and sine-Gordon equation, and obtain at least second order approximate solutions to them. These equations include the cases of real and complex field variables and the cases of the first and the second order time derivatives.

  14. Construction safety program for the National Ignition Facility

    International Nuclear Information System (INIS)

    Cerruti, S.J.

    1997-01-01

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF. During this period, all workers are required to implement measures to create a universal awareness which promotes safe practice at the work site, and which will achieve NIF's management objectives in preventing accidents and illnesses. Construction safety for NIF is predicated on everyone performing their jobs in a manner which prevents job-related disabling injuries and illnesses. The CSP outlines the minimum environment, safety, and health (ES ampersand H) standards, LLNL policies and the Construction Industry Institute (CII) Zero Injury Techniques requirements that all workers at the NIF construction site shall adhere to during the construction period of NIF. It identifies the safety requirements which the NIF organizational Elements, construction contractors and construction subcontractors must include in their safety plans for the construction period of NIF, and presents safety protocols and guidelines which workers shall follow to assure a safe and healthful work environment. The CSP also identifies the ES ampersand H responsibilities of LLNL employees, non-LLNL employees, construction contractors, construction subcontractors, and various levels of management within the NIF Program at LLNL. In addition, the CSP contains the responsibilities and functions of ES ampersand H support organizations and administrative groups, and describes their interactions with the NIF Program

  15. Construction safety program for the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Cerruti, S.J.

    1997-01-01

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF. During this period, all workers are required to implement measures to create a universal awareness which promotes safe practice at the work site, and which will achieve NIF`s management objectives in preventing accidents and illnesses. Construction safety for NIF is predicated on everyone performing their jobs in a manner which prevents job-related disabling injuries and illnesses. The CSP outlines the minimum environment, safety, and health (ES&H) standards, LLNL policies and the Construction Industry Institute (CII) Zero Injury Techniques requirements that all workers at the NIF construction site shall adhere to during the construction period of NIF. It identifies the safety requirements which the NIF organizational Elements, construction contractors and construction subcontractors must include in their safety plans for the construction period of NIF, and presents safety protocols and guidelines which workers shall follow to assure a safe and healthful work environment. The CSP also identifies the ES&H responsibilities of LLNL employees, non-LLNL employees, construction contractors, construction subcontractors, and various levels of management within the NIF Program at LLNL. In addition, the CSP contains the responsibilities and functions of ES&H support organizations and administrative groups, and describes their interactions with the NIF Program.

  16. Title V Operating Permit: XTO Energy, Inc. - River Bend Dehydration Site

    Science.gov (United States)

    Initial Title V Operating Permit (Permit Number: V-UO-000026-2011.00) and the Administrative Permit Record for the XTO Energy, Inc., River Bend Dehydration Site, located on the Uintah and Ouray Indian Reservation.

  17. Modeling injury rates as a function of industrialized versus on-site construction techniques

    OpenAIRE

    Rubio Romero, Juan Carlos; Suárez Cebador, Manuel; Abad Puente, Jesús

    2014-01-01

    It is often predicted that the industrialization of building activities will lead to a reduction of accident rates in the construction sector, particularly as a result of switching activities from building sites to factories. However, to date no scientific research has provided objective quantitative results to back up this claim. The aim of this paper is to evaluate how industrialization affects the accident rate in different industrialized building systems in Spain. Our results revealed tha...

  18. GHG emission quantification for pavement construction projects using a process-based approach

    Directory of Open Access Journals (Sweden)

    Charinee Limsawasd

    2017-03-01

    Full Text Available Climate change and greenhouse gas (GHG emissions have attracted much attention for their impacts upon the global environment. Initiating of new legislation and regulations for control of GHG emissions from the industrial sectors has been applied to address this problem. The transportation industries, which include operation of road pavement and pavement construction equipment, are the highest GHG-emitting sectors. This study presents a novel quantification model of GHG emissions of pavement construction using process-based analysis. The model is composed of five modules that evaluate GHG emissions. These are: material production and acquisition, (2 material transport to a project site, (3 heavy equipment use, (4 on-site machinery use, and, (5 on-site electricity use. The model was applied to a hypothetical pavement project to compare the environmental impacts of flexible and rigid pavement types during construction. The resulting model can be used for evaluation of environmental impacts, as well as for designing and planning highway pavement construction.

  19. Regulatory Review of Early Site Permit Applications

    International Nuclear Information System (INIS)

    Scott, Michael L.

    2004-01-01

    The U.S. Nuclear Regulatory Commission (NRC) has received and is reviewing three applications for early site permits (ESPs). The ESP process allows early resolution of site-related issues affecting possible construction and operation of a new nuclear power plant. The nuclear industry views a successful and predictable ESP process as an important step in assessing whether to seek authorization to construct and operate a new generation of nuclear power reactors in the United States. Because consideration of ESP applications is a first-of-a-kind activity, a number of issues have emerged prior to and during the reviews of the first three applications. Issues have included the need for design information at the ESP stage, accident analyses, quality assurance, and seismic analyses. The NRC has been working to resolve identified issues to support a Commission decision on whether to issue an ESP approximately 33-37 months after receipt of each ESP application. (authors)

  20. Mercury Deposition Network Site Operator Training for the System Blank and Blind Audit Programs

    Science.gov (United States)

    Wetherbee, Gregory A.; Lehmann, Christopher M.B.

    2008-01-01

    The U.S. Geological Survey operates the external quality assurance project for the National Atmospheric Deposition Program/Mercury Deposition Network. The project includes the system blank and blind audit programs for assessment of total mercury concentration data quality for wet-deposition samples. This presentation was prepared to train new site operators and to refresh experienced site operators to successfully process and submit system blank and blind audit samples for chemical analysis. Analytical results are used to estimate chemical stability and contamination levels of National Atmospheric Deposition Program/Mercury Deposition Network samples and to evaluate laboratory variability and bias.

  1. Construction Management Risk System (CMRS for Construction Management (CM Firms

    Directory of Open Access Journals (Sweden)

    Kyungmo Park

    2017-02-01

    Full Text Available After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence of risk management systems. Thus, it was concluded that it was necessary to develop standard operating systems and implement risk management systems in order to manage risks effectively. Therefore, the purpose of this study was to develop a construction risk management system (CRMS for systematically managing risks. For this purpose, the field operation managers of CM firms were interviewed and surveyed in order to define risk factors. Upon this, a risk assessment priority analysis was performed. Finally, a risk management system that comprised seven modules and 20 sub-modules and was capable of responding systematically to risks was proposed. Furthermore, the effectiveness of this system was verified through on-site inspection. This system allows early response to risks, accountability verification and immediate response to legal disputes with clients by managing risk records.

  2. An assessment of the performance of municipal constructed wetlands in Ireland.

    Science.gov (United States)

    Hickey, Anthony; Arnscheidt, Joerg; Joyce, Eadaoin; O'Toole, James; Galvin, Gerry; O' Callaghan, Mark; Conroy, Ken; Killian, Darran; Shryane, Tommy; Hughes, Francis; Walsh, Katherine; Kavanagh, Emily

    2018-03-15

    While performance assessments of constructed wetlands sites around the world have appraised their capacity for effective removal of organics, a large variance remains in these sites' reported ability to retain nutrients, which appears to depend on differences in design, operation and climate factors. Nutrient retention is a very important objective for constructed wetlands, to avoid eutrophication of aquatic environments receiving their effluents. This study assessed the performance of constructed wetlands in terms of nutrient retention and associated parameters under the humid conditions of Ireland's temperate maritime climate. A review of the performance of 52 constructed wetland sites from 17 local authorities aimed to identify the best performing types of constructed wetlands and the treatment factors determining successful compliance with environmental standards. Data analysis compared effluent results from constructed wetlands with secondary free surface flow or tertiary horizontal subsurface flow, hybrid systems and integrated constructed wetlands with those from small-scale mechanical wastewater treatment plants of the same size class. Nutrient concentrations in effluents of constructed wetlands were negatively correlated (p treatment performance of constructed wetlands significantly (p wastewater treatment plants, secondary free surface water and tertiary horizontal subsurface flow wetlands showed a very large variance in effluent concentrations for organic and nutrient parameters. E. coli numbers in effluents were lowest for integrated constructed wetlands with an arithmetic mean of 89 MPN/100 ml. Despite Ireland's humid climate, some constructed wetland sites achieved long or frequent periods of zero effluent discharge and thus did not transfer any waterborne pollution to their receptors during these periods. Copyright © 2018 Elsevier Ltd. All rights reserved.

  3. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  4. Repository for spent nuclear fuel. Preliminary construction description - layout D Oskarshamn the Simpevarp area

    International Nuclear Information System (INIS)

    2006-02-01

    This report presents the preliminary design of a repository located in the Simpevarp area. The description has been disposed so as to deal primarily with the site dependent layouts for the above- and underground constructions. The report is disposed as follows: c1 gives the background and some basic information. Chapter 2 presents the demands and necessary conditions that take precedence when adapting the plant to the local conditions, construction, operation and closure. Chapter 3 is a general description of the area, its infrastructure and the specific sites that have been studied. Chapter 4-5 describe the design of the plant for the two chosen sites. Chapter 6 gives a review of data for the plant, and Chapter 7 'References' is the last part of the main document. The appendices A-I give brief information on the general, non-site specific, parts of the plant, e.g. buildings, life cycle, system, operation and organization

  5. Repository for spent nuclear fuel. Preliminary construction description - layout D Oskarshamn the Laxemar area

    International Nuclear Information System (INIS)

    2006-05-01

    This report presents the preliminary design of a repository located in the Laxemar area. The description has been disposed so as to deal primarily with the site dependent layouts for the above- and underground constructions. The report is disposed as follows: Chapter 1 gives the background and some basic information. Chapter 2 presents the demands and necessary conditions that take precedence when adapting the plant to the local conditions, construction, operation and closure. Chapter 3 is a general description of the area, its infrastructure and the specific sites that have been studied. Chapters 4-5 describe the design of the plant for the two chosen sites. Chapter 6 gives a review of data for the plant, and Chapter 7 'References' is the last part of the main document. The appendices A-I give brief information on the general, non-site specific, parts of the plant, e.g. buildings, life cycle, system, operation and organization

  6. Basic repository environment assessment design basis, Cypress Creek Dome Site

    International Nuclear Information System (INIS)

    1988-03-01

    This study examines the engineering factors and costs associated with the construction, operation, and decommissioning of a high-level nuclear waste repository in salt in the Gulf Interior Region at Cypress Creek Cone, Mississippi. The study assumes a repository capacity of 36,000 metric tons of heavy metal (MTHM) of unreprocessed spent fuel and 36,000 MTHM of commercial high-level reprocessing waste, along with 7020 canisters of defense high-level reprocessing waste and associated quantities of remote- and contact-handled transuranic waste (TRU). With the exception of TRU, all the waste forms are placed in 300- to 1000-year-life carbon-steel waste packages in a collocated waste handling and packaging facility (WHPF), which is also described. The construction, operation, and decommissioning of the proposed repository is estimated to cost approximately $4.66 billion. Costs include those for the collocated WHPF, engineering, and contingency, but exclude waste from assembly and shipment to the site and waste package fabrication and shipment to the site. These costs reflect the relatively easy access to the site. Construction would require an estimated 7 years. Engineering factors and costs are not strongly influenced by environmental considerations. 53 refs., 24 figs., 10 tabs

  7. The Finnish final disposal programme proceeds to the site selection

    International Nuclear Information System (INIS)

    Seppaelae, T.

    1999-01-01

    Research for the selection of the final disposal site has been carried out already since the beginning of 1980's. Field studies were started in 1987: In the recent years, studied sites have included Olkiluoto in Eurajoki, Haestholmen in Loviisa, Romuvaara in Kuhmo and Kivetty in Aeaenekoski. Based on 40 years operation of four power plant units, the estimate for the accumulation of spent fuel to be disposed of in Finland is 2,600 tU. A 'Decision in Principle' is needed from the Finnish government to select the final disposal site, Posiva submitted the application for a policy decision in May 1999. The intended site of the facility is Olkiluoto which produces most of the spent fuel in Finland: A disposal would minimise the need of transports. In a poll among the inhabitants of Eurajoki, 60 per cent approved the final disposal facility. After a positive decision of the government, Posiva will construct an underground research facility in Olkiluoto. The construction of the final disposal facility will take place in the 2010's, the facility should be operational in 2020. (orig.) [de

  8. Costs of construction, operation and maintenance of nuclear power plants - determinant factors

    International Nuclear Information System (INIS)

    Silva, R.A. da

    1981-01-01

    A study about the construction costs of the Angra-1 nuclear power plant, including direct costs, equipment costs, installation and indirect costs such as: engineering, job-training and administration is presented. The operation and maintenance costs of the Angra-1 nuclear power plant and costs of energy generation are still studied. (E.G.) [pt

  9. Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report, January--March 1996

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles City Dept. of Water and Power, CA (United States)] [and others

    1996-08-01

    Goals of the site operator program include field evaluation of electric vehicles (EVs) in real-world applications and environments, advancement of electric vehicle technologies, development of infrastructure elements necessary to support significant EV use, and increasing the awareness and acceptance of EVs by the public. The site operator program currently consists of 11 participants under contract and two other organizations with data-sharing agreements with the program. The participants (electric utilities, academic institutions, Federal agencies) are geographically dispersed within US and their vehicles see a broad spectrum of service conditions. Current EV inventories of the site operators exceeds 250 vehicles. Several national organizations have joined DOE to further the introduction and awareness of EVs, including: (1) EVAmerica (a utility program) and DOE conduct performance and evaluation tests to support market development for EVs; (2) DOE, DOT, the Electric Transportation Coalition, and the Electric Vehicle Association of the Americas are conducting a series of workshops to encourage urban groups in Clean Cities (a DOE program) to initiate the policies and infrastructure development necessary to support large-scale demonstrations, and ultimately the mass market use, of EVs. Current focus of the program is collection and dissemination of EV operations and performance data to aid in the evaluation of real- world EV use. This report contains several sections with vehicle evaluation as a focus: EV testing results, energy economics of EVs, and site operators activities.

  10. The chirality operators for Heisenberg spin systems

    International Nuclear Information System (INIS)

    Subrahmanyam, V.

    1994-01-01

    The ground state of closed Heisenberg spin chains with an odd number of sites has a chiral degeneracy, in addition to a two-fold Kramers degeneracy. A non-zero chirality implies that the spins are not coplanar, and is a measure of handedness. The chirality operator, which can be treated as a spin-1/2 operator, is explicitly constructed in terms of the spin operators, and is given as commutator of permutation operators. (author). 3 refs

  11. Authorization procedure for the construction and operation of nuclear installations within certain non-member states of the European Communities. Canada, Spain, Sweden, Switzerland, the United States and Yugoslavia 1975

    International Nuclear Information System (INIS)

    Amaducci, Sandro; Dider, J.M.

    1976-01-01

    In all the countries considered except Switzerland, a formal site approval for a future nuclear installation is necessary before any request for construction can be placed with the licensing authority. Moreover, two separate authorizations - one for construction and the other for operation - are needed before full operations can begin. It is only in Sweden that no express application is required for a full operating authorization. Between the respective authorizations for construction and full operation, there are, in Canada, Spain and Sweden, one or more intermediate formal authorizations to be delivered by the licensing authority, and this alongside the progressive full loading of the nuclear installation concerned. As regards the decision-making level, the relevant authorizations are generally issued at centralized level, except in Yugoslavia, and to a certain extent, in Switzerland - this being because of the federal structure of these countries. Furthermore, public hearings are organized during the authorization procedure, except in Switzerland and Yugoslavia. Finally, there are steps which are very particular to the country concerned. In Canada, there is an informal 'application' and discussion between the 'applicant' and the licensing authority before the real procedure begins, whereas in the United States, the Attorney General carried out an anti-trust review at a pre-procedural stage. Further it is only in the latter country that time requirements are fixed by regulations for certain steps of the procedure

  12. Development of new construction technologies for nuclear power plant

    International Nuclear Information System (INIS)

    Kawamata, Susumu; Itoh, Daisuke; Ichizono, Katsuyuki

    1995-01-01

    In order to proceed rationally with the construction of a nuclear power station, the followings are the subject to solve beside reducing the construction cost: shortening the construction period, improving the quality, and securing safety in the construction work. As a measure to solve the matters, we correctly construct the plant mainly applying 'all-weather proof construction method' and 'pre-assembled large-block construction method'. Furthermore, as the plant construction control system, we perform a construction work applying the design change management system, pre-assessment for safety, and the whole facility check. As a result of our effort, it was attained that when we compare the matured plant with the first unit, the construction cost is reduced by 30%, the construction period is shortened by 12 months, site manpower is decreased by 30%, and the plant had no sudden shutdowns even during the trial operation period. (author)

  13. A comparative study of floor construction on sloping sites: an analysis of cumulative energy demand and greenhouse gas emissions

    Directory of Open Access Journals (Sweden)

    Grace Ding

    2016-03-01

    Full Text Available In order to make environmentally aware decisions, there is growing interest in the comparative energy and greenhouse gas (GHG performance of competing construction methods. Little research has been done concerning competing ground floor construction methods, especially given different site variables, such as slope and soil type. A life cycle assessment approach was adopted to analyse environmental impacts, including cumulative energy demand and GHG emissions for detached housing construction in Australia. Data was drawn from 24 case study housing projects, including 12 reinforced concrete and 12 suspended timber floor projects. The data presented in the paper compares cumulative energy demand, GHG and the constituent parts of competing construction methods. The findings indicate that the timber floors use/create significantly less cumulative energy demand and GHG emissions than concrete floors—approximately 2.1 to 2.7 times less energy and 2.3 to 2.9 times less GHG. These findings are limited to the site slope and foundation soil types identified in the paper. The main application of the work is in guidance concerning the lowest environmental impact options for detached housing construction.

  14. 4D modeling in high-rise construction

    Science.gov (United States)

    Balakina, Anastasiya; Simankina, Tatyana; Lukinov, Vitaly

    2018-03-01

    High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  15. State-of-the-Art Report for the Deep URL Facility Development : Aspo Hard Rock Laboratory, Grimsel Test Site

    International Nuclear Information System (INIS)

    Kim, Kyung Su; Bae, Dae Seok; Kim, Geon Young

    2012-01-01

    This report analysed the development status on the SKB's Hard Rock Laboratory and Nagra's Grimsel Test Site facilities to investigate their facility overview, operation system, site condition, project history and procedure, and current experiment programmes of underground research laboratory. SKB and Nagra had launched high level radioactive waste disposal project around 1970's. Actual site investigation activities were initiated since 1990's and the time schedule for siting programmes to determine the final disposal site were taken fifteen to thirty years. Furthermore, ten to twenty years will be needed to site characterization, facility design, construction, and operation commissioning. Nagra had constructed Grimsel Test Site facility in southern Switzerland Apls with the collaboration of KWO electrical company in early 1980's. This facility is characterized of a centre of excellence for underground Research and Development (R and D) to support projects for the disposal of radioactive and chemo-toxic waste and not a potential repository site. The SKB's Aspo HRL constructed in outside Oskarshamn is a unique PBG-URL facility. SKB is conducting full-scale research and development here in preparation for the construction of a final repository for spent nuclear fuel. The research programmes for the development of disposal technologies is performed over thirty to fifty years prior to repository operation. In 2000's, research on long-term phenomena, i.e., optimization of disposal concept, understanding of coupling process, validation of mathematical model, test and development of safety assessment models, characterization of deep geochemical environment, and long-term demonstration experiments have been leading the issues of research and development

  16. Introduction to Envirocare of Utah's low activity radioactive waste disposal site located at Clive, Utah

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Envirocare of Utah was licensed by the state of Utah on February 2, 1988, to become fully operational to receive low-activity radioactive waste at its disposal site near Clive, Utah. This paper discusses the organization of the firm, political support, acceptable materials, benefits of the operation, site characteristics, construction, health physics program, and environmental program

  17. The ATLAS Insertable B-Layer: from construction to operation

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00218666; The ATLAS collaboration

    2016-01-01

    The ATLAS Insertable B-Layer (IBL) is the innermost layer of pixel detectors, and was installed in May 2014 at a radius of 3.3 cm from the beam axis, between the existing Pixel detector and a new smaller radius beam-pipe. The new detector, built to cope with high radiation and occupancy, is the first large scale application of 3D sensors and CMOS 130 nm technology. The IBL detector construction was completed within about two years (2012-2014), and the key features and challenges met during the IBL project are presented, as well as its commissioning and operational experience at the LHC

  18. Loviisa starts low-level operating waste disposal in 1997

    International Nuclear Information System (INIS)

    Snellman, J.

    1996-01-01

    At an early stage Imatran Voima Oy (IVO) decided to construct a waste repository for Loviisa NPP. The suitability of the power plant site for final disposal of low- and intermediate- level operating waste was studied. In the site report in 1982 the plant site was found to be geologically suitable and economically feasible for construction. The necessary preparations started in 1992. The repository will be constructed in three phases. The first phase will cover the transport tunnel, construction of one maintenance waste tunnel and the excavation of another maintenance waste tunnel together with a hall for solidified wastes. This phase will be finished by the end of 1996. During the second phase in the beginning of next century the remaining already excavated rooms will be furnished. Finally in the third phase the repository will be extended for the decommissioning waste somewhere around years 2020-2025. (3 figs., 1 tab.)

  19. Problems of economic assessment of social impacts of construction anO operation of nuctear power plant in the area

    International Nuclear Information System (INIS)

    Koudelka, F.

    1984-01-01

    The impacts of nuclear power plant construction and operation are divided into economic, demographic, on town planning, historic, etc. Further subdivision is performed according to the intensity of construction impacts, to the sequence and quality of impact and to the effects in space and time. The area of environmental impacts is classified into the protective area and the areas of immediate, limited and broad impact. The methods of the evaluation of nuclear power plant construction and operation impacts are discussed. (E.S.)

  20. Siting, design and construction of a deep geological repository for the disposal of high level and alpha bearing wastes

    International Nuclear Information System (INIS)

    1990-06-01

    The main objective of this document is to summarize the basic principles and approaches to siting, design and construction of a deep geological repository for disposal of high level and alpha bearing radioactive wastes, as commonly agreed upon by Member States. This report is addressed to decision makers and technical managers as well as to specialists planning for siting, design and construction of geological repositories for disposal of high level and alpha bearing wastes. This document is intended to provide Member States of the IAEA with a summary outline for the responsible implementing organizations to use for siting, designing and constructing confinement systems for high level and alpha bearing radioactive waste in accordance with the protection objectives set by national regulating authorities or derived from safety fundamentals and standards of the IAEA. The protection objectives will be achieved by the isolation of the radionuclides from the environment by a repository system, which consists of a series of man made and natural safety barriers. Engineered barriers are used to enhance natural geological containment in a variety of ways. They must complement the natural barriers to provide adequate safety and necessary redundancy to the barrier system to ensure that safety standards are met. Because of the long timescales involved and the important role of the natural barrier formed by the host rock, the site selection process is a key activity in the repository design and development programme. The choice of the site, the investigation of its geological setting, the exploration of the regional hydrogeological setting and the primary underground excavations are all considered to be part of the siting process. 16 refs

  1. A lean and agile construction system as a set of countermeasures to improve health, safety and productivity in mechanical and electrical construction

    OpenAIRE

    Court, PF; Pasquire, CL; Gibb, AGF

    2009-01-01

    This paper presents certain aspects of the findings of a research project to develop and implement a Lean and agile mechanical and electrical (M&E) Construction System on a case study project. The objective of the research project for the sponsor company is to improve its projects site operations making them safer for the worker and improving efficiency and productivity by overcoming the problems and issues that it faces in the M&E industry within the UK construction sector. The research find...

  2. Reindeer habitat use in relation to two small wind farms, during preconstruction, construction, and operation.

    Science.gov (United States)

    Skarin, Anna; Alam, Moudud

    2017-06-01

    Worldwide there is a rush toward wind power development and its associated infrastructure. In Fennoscandia, large-scale wind farms comprising several hundred windmills are currently built in important grazing ranges used for Sámi reindeer husbandry. In this study, reindeer habitat use was assessed using reindeer fecal pellet group counts in relation to two relatively small wind farms, with 8 and 10 turbines, respectively. In 2009, 1,315 15-m 2 plots were established and pellet groups were counted and cleaned from the plots. This was repeated once a year in May, during preconstruction, construction, and operation of the wind farms, covering 6 years (2009-2014) of reindeer habitat use in the area. We modeled the presence/absence of any pellets in a plot at both the local (wind farm site) and regional (reindeer calving to autumn range) scale with a hierarchical logistic regression, where spatial correlation was accounted for via random effects, using vegetation type, and the interaction between distance to wind turbine and time period as predictor variables. Our results revealed an absolute reduction in pellet groups by 66% and 86% around each wind farm, respectively, at local scale and by 61% at regional scale during the operation phase compared to the preconstruction phase. At the regional, scale habitat use declined close to the turbines in the same comparison. However, at the local scale, we observed increased habitat use close to the wind turbines at one of the wind farms during the operation phase. This may be explained by continued use of an important migration route close to the wind farm. The reduced use at the regional scale nevertheless suggests that there may be an overall avoidance of both wind farms during operation, but further studies of reindeer movement and behavior are needed to gain a better understanding of the mechanisms behind this suggested avoidance.

  3. Longview District Operations and Maintenance Headquarters: Environmental assessment

    International Nuclear Information System (INIS)

    1992-03-01

    Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives

  4. Construction and initial operation of MHD PbLi facility at UCLA

    Energy Technology Data Exchange (ETDEWEB)

    Smolentsev, S., E-mail: sergey@fusion.ucla.edu; Li, F.-C.; Morley, N.; Ueki, Y.; Abdou, M.; Sketchley, T.

    2013-06-15

    Highlights: • New MHD PbLi loop has been constructed and tested at UCLA. • Pressure diagnostics system has been developed and successfully tested. • Ultrasound Doppler velocimeter is tested as velocity diagnostics. • Experiments on pressure drop reduction have been performed. • Experiments on MHD flow in a duct with SiC flow channel insert are underway. -- Abstract: A magnetohydrodynamic flow facility MaPLE (Magnetohydrodynamic PbLi Experiment) that utilizes molten eutectic alloy lead–lithium (PbLi) as working fluid has been constructed and tested at University of California, Los Angeles. The loop operation parameters are: maximum magnetic field 1.8 T, PbLi temperature up to 350 °C, maximum PbLi flow rate with/without a magnetic field 15/50 l/min, maximum pressure head 0.15 MPa. The paper describes the loop itself and its major components, basic operation procedures, experience of handling PbLi, initial loop testing, flow diagnostics and current and near-future experiments. The obtained test results of the loop and its components have demonstrated that the new facility is fully functioning and ready for experimental studies of magnetohydrodynamic, heat and mass transfer phenomena in PbLi flows and also can be used in mock up testing in conditions relevant to fusion applications.

  5. Basic repository environmental assessment design basis, Richton Dome site

    International Nuclear Information System (INIS)

    1988-01-01

    This study examines the engineering factors and costs associated with the construction, operation, and decommissioning of a high-level nuclear waste repository in salt in the Gulf Interior Region at Richton Dome in Perry County, Mississippi. The study assumes a repository capacity of 36,000 metric tons of heavy metal (MTHM) of unreprocessed spent fuel and 36,000 MTHM of commercial high-level reprocessing waste, along with 7,020 canisters of defense high-level reprocessing waste and associated quantities of remote-and contact-handled transuranic waste (TRU). With the exception of TRU, all the waste forms are placed in 300- to 1,000-year-life carbon-steel waste packages in a collocated waste handling and packaging facility (WHPF), which is also described. The construction, operation, and decommissioning of the proposed repository is estimated to cost approximately $4.49 billion. Costs include those for the WHPF, engineering, and contingency, but exclude waste form assembly and shipment to the site and waste package fabrication and shipment to the site. These costs reflect the relative average wage rates of the region and the relatively easy access to the site. Construction would require an estimated 6.25 years. Engineering factors and costs are not strongly influenced by environmental considerations. 52 refs., 24 figs., 20 tabs

  6. Basic repository environmental assessment design basis, Davis Canyon site

    International Nuclear Information System (INIS)

    1984-01-01

    This study examines the engineering factors and costs associated with the construction, operation, and decommissioning of a high-level nuclear waste repository in salt in the Paradox Basin in Davis Canyon, Utah. The study assumes a repository capacity of 36,000 metric tons of heavy metal (MTHM) of unreprocessed spent fuel and 36,000 MTHM of commercial high-level reprocessing waste, along with 7,020 canisters of defense high-level reprocessing waste and associated quantities of remote- and contact-handled transuranic waste (TRU). With the exception of TRU, all the waste forms are placed in 300- to 1,000-year-life carbon-steel waste packages in a collected waste handling and packaging facility (WHPF), which is also described. The construction, operation, and decommissioning of the proposed repository is estimated to cost approximately $5.49 billion. Costs include those for the collocated WHPF, engineering, and contingency, but exclude waste form assembly and shipment to the site and waste package fabrication and shipment to the site. These costs reflect the relative average wage rates of the region and the relatively sound nature of the salt at this site. Construction would require an estimated 7.75 years. Engineering factors and costs are not strongly influenced by environmental considerations. 50 refs., 24 figs., 20 tabs

  7. Basic repository environmental assessment design basis, Lavender Canyon site

    International Nuclear Information System (INIS)

    1988-01-01

    This study examines the engineering factors and costs associated with the construction, operation, and decommissioning of a high-level nuclear waste repository in salt in the Paradox Basin in Lavender Canyon, Utah. The study assumes a repository capacity of 36,000 metric tons of heavy metal (MTHM) of unreprocessed spent fuel and 36,000 MTHM of commercial high-level reprocessing waste, along with 7020 canisters of defense high-level reprocessing waste and associated quantities of remote- and contact-handled transuranic waste (TRU). With the exception of TRU, all the waste forms are placed in 300- to 1000-year-life carbon-steel waste packages in a collocated waste handling and packaging facility (WHPF), which is also described. The construction, operation, and decommissioning of the proposed repository is estimated to cost approximately $5.51 billion. Costs include those for the collocated WHPP, engineering, and contingency, but exclude waste form assembly and shipment to the site and waste package fabrication and shipment to the site. These costs reflect the relative average wage rates of the region and the relatively sound nature of the salt at this site. Construction would require an estimated 7.75 years. Engineering factors and costs are not strongly influenced by environmental considerations. 51 refs., 24 figs., 20 tabs

  8. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and Other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA)

    Science.gov (United States)

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  9. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock, Colorado: Appendix B to Attachment 3, Lithologic logs and monitor well construction information. Final report

    International Nuclear Information System (INIS)

    1995-09-01

    This volume contains lithology logs and monitor well construction information for: NC processing site; UC processing site; and Burro Canyon disposal site. This information pertains to the ground water hydrology investigations which is attachment 3 of this series of reports

  10. Project Guarantee 1985. Repository for high-level radioactive waste: construction and operation

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    An engineering project study aimed at demonstrating the feasibility of constructing a deep repository for high-level waste (Type C repository) has been carried out; the study is based on a model data-set representing typical geological and rock mechanical conditions as found outside the so-called Permocarboniferous basin in the regions under investigation by Nagra in Cantons Aargau, Schaffhausen, Solothurn and Zuerich. The repository is intended for disposal of high-level waste and any intermediate-level waste from re-processing in which the concentration of long-lived alpha-emitters exceeds the permissible limits set for a Type B repository. Final disposal of high-level waste is in subterranean, horizontally mined tunnels and of intermediate-level waste in underground vertical silos. The repository is intended to accomodate a total of around 6'000 HWL-cylinders (gross volume of around 1'200 m3) and around 10'000 m3 of intermediate-level waste. The total excavated volume is around 1'100'000 m3 and a construction time for the whole repository (up to the beginning of emplacement) of around 15 years is expected. For the estimated 50-year emplacement operations, a working team of around 60 people will be needed and a team of around 160 for the simultaneous tunnelling operations and auxiliary work. The project described in the present report permits the conclusion that construction of a repository for high-level radioactive waste and, if necessary, spent fuel-rods is feasible with present-day technology

  11. Ten years of cryo-magnetic W7-X test facility construction and operation

    International Nuclear Information System (INIS)

    Renard, B.; Dispau, G.; Donati, A.; Genini, L.; Gournay, J.F.; Kuster, O.; Molinie, F.; Schild, T.; Touzery, R.; Vieillard, L.; Walter, C.

    2011-01-01

    The construction, commissioning, and operation phases of the W7-X cryo-magnetic test facility in CEA Saclay lasted ten years. The large diversity of equipments called, specialties involved and problems solved attest the expertise that was required to operate the test facility and test the coils. Nearly one hundred cryogenic tests were performed on the seventy W7-X coils, at a rate always increasing, using two cryostats each holding two coils. This paper presents the test facility and its operation first, the cryogenic difficulties that were confronted with their solutions, the electro-magnetic difficulties encountered along with corrective actions, and finally the instrumentation and data acquisition aspects. (authors)

  12. Mucinous adenocarcinoma arising at the anastomotic site after operation for hirschsprung's disease: case report

    International Nuclear Information System (INIS)

    Kim, Hyung Soo; Yoon, Kwon Ha

    2004-01-01

    To our knowledge, rectal cancer arising at the anastomotic site after surgery for Hirschsprung's disease has not been reported. We report a case of mucinous adenocarcinoma arising at the anastomotic site after Soave operation 26 years ago

  13. An investigation and analysis of safety issues in Polish small construction plants.

    Science.gov (United States)

    Dąbrowski, Andrzej

    2015-01-01

    The construction industry is a booming sector of the Polish economy; however, it is stigmatised by a lower classification due to high occupational risks and an unsatisfactory state of occupational safety. Safety on construction sites is compromised by small construction firms which dominate the market and have high accident rates. This article presents the results of studies (using a checklist) conducted in small Polish construction companies in terms of selected aspects of safety, such as co-operation with the general contractor, occupational health and safety documents, occupational risk assessment, organization of work, protective gear and general work equipment. The mentioned studies and analyses provided the grounds to establish the main directions of preventive measures decreasing occupational risk in small construction companies, e.g., an increase in engagement of investors and general contractors, improvement of occupational health and safety (OSH) documents, an increase in efficiency of construction site managers, better stability of employment and removal of opposing objectives between economic strategy and work safety.

  14. Hanford Site Welding Program Successfully Providing A Single Site Function For Use By Multiple Contractors

    International Nuclear Information System (INIS)

    Cannell, G.R.

    2009-01-01

    The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

  15. HITACHI construction CAE system

    International Nuclear Information System (INIS)

    Yoshida, M.

    1994-01-01

    Construction and maintenance of nuclear power plants have important problems such as shortening the construction period and reducing the construction cost. Recently, the problem of insufficient construction labor has arisen, and as drastic strategic development has become a necessary counter-measure. The following four principles are included in the measures to be taken for efficient execution of the construction work within the short construction period: (1) reduction of on-site work and expansion of module block making, (2)improvement of the accuracy of the on-site work process, adjustment and expansion of the work in parallel with the construction process, (3)improvement of efficiency of the on-site work and mechanization and automation of the work, (4)improvement of the accuracy of the management of the construction. A three dimensional simulation system plant construction plan CAE, comprising five modules has been developed. A project management system was also developed to improve the accuracy and efficiency of management work in the field

  16. Performance of a radioactive waste internment site

    International Nuclear Information System (INIS)

    Bernhardt, D.E.; Owen, D.H.; Mishub, R.J.; Prewett, S.V.; Cole, L.W.

    1990-01-01

    Aerojet disposed of 30,000 cubic meters of uranium and thorium wastes in an engineered 12,000 square meter (3 acre) internment site in Tennessee. The operation, performed under a State of Tennessee source material license, is based on termination of the license with the material remaining in place, and the option of future commercial use of the site. The closure plan included a long-term monitoring program. Yearly monitoring of the site has verified performance within the design criteria. Full-time construction monitored by a licensed engineer and extensive testing of materials ensured construction of the site according to or better than the specifications. Surface subsidence of the site has averaged about 2.2 cm with a range of 0 to 4.3 cm at 11 settlement markers after 4 years. The anticipated settlement, based on design parameters, was between 15 and 25 cm. The present anticipated settlement is 8 to 15 cm, based on the as-built parameters, and the long-term monitoring results. Slope stability analysis indicates the stability has improved with time due to consolidation of materials and reduced groundwater activity as a result of site construction. There has been no need for corrective action maintenance due to erosion, sluffing of slopes, or subsidence. Groundwater monitoring indicates the materials have been isolated, and there have also been no indications of springs or leakage from the site. 9 refs., 2 figs., 3 tabs

  17. Hydrosphere monitoring at nuclear power plant sites

    International Nuclear Information System (INIS)

    Belousova, A.P.; Zakharova, T.V.; Shvets, V.M.

    1993-01-01

    The paper deals with problems related to protection of the environment in areas occupied by nuclear power plants (NPP). NPP construction and operation result in destruction of ecological, geochemical and geological equilibria in and around NPP sites. This process requires monitoring. Recommendations of the International Agency for Atomic Energy (IAAE) suggest monitoring to commence 2-3 years prior to the start of NPP construction. The paper describes the extent of hydrosphere monitoring and guidelines along which monitoring is to be organized. The authors recommend a certain approach toward the planning observation networks and provide description of forecasting subsystem that consist of a data bank, a continuously operating model (COM) and a forecast unit

  18. Siting a low-level radioactive waste disposal facility in California

    International Nuclear Information System (INIS)

    Romano, S.A.; Gaynor, R.K.

    1991-01-01

    US Ecology is the State of California's designee to site, develop and operate a low-level radioactive waste disposal facility. In March 1988, a site in the Ward Valley of California's Mojave Desert was chosen for development. Strong local community support has been expressed for the site. US Ecology anticipates licensing and constructing a facility to receive waste by early 1991. This schedule places California well ahead of the siting milestones identified in Federal law. (author) 1 fig., 2 refs

  19. Basic repository environmental assessment design basis: Deaf Smith County site

    International Nuclear Information System (INIS)

    1988-03-01

    This study examines the engineering factors and costs associated with the construction, operation, and decommissioning of a high-level nuclear waste repository in salt in the Palo Duro Basin in Deaf Smith County, Texas. The study assumes a repository capacity of 36,000 metric tons of heavy metal (MTHM) of unreprocessed spent fuel and 36,000 MTHM of commercial high-level reprocessing waste, along with 7,020 canisters of defense high-level reprocessing waste and associated quantities or remote- and contact-handled transuranic waste (TRU). With the exception of TRU, all the waste forms are placed in 300- to 1000-year-life carbon-steel waste packages in a collocated waste handling and packaging facility (WHPF), which is also described. The construction, operation, and decommissioning of the proposed repository is estimated to cost approximately $4.64 billion. Costs include those for the collocate WHPF, engineering, and contingency, but exclude waste form assembly and shipment to the site and waste package fabrication and shipment to the site. These costs reflect the relative average wage rates of the region, the relatively easy access to the site, and the relatively weak nature of the salt at this site. Construction would require an estimated 7 to 7.5 years. Engineering factors and costs are not strongly influenced by environmental considerations. 62 refs., 24 figs., 20 tabs

  20. Design, Construction and Operation of a Molten Carbonate Fuel Cell (MCFC) in the 100-kW-Class

    International Nuclear Information System (INIS)

    Heiming, Andreas; Huppmann, Gerhard; Aasberg-Petersen, Kim

    1999-01-01

    In fuel cells, the electrochemical energy of the fuel is converted directly into electricity and heat. The electrochemical conversion is inherently related to high electrical efficiencies and very low pollutant emissions. Fuel cells with sufficiently high operating temperatures such as (1) the phosphoric acid fuel cell (PAFC), operating temperature: 200 o C, (2) the molten carbonate fuel cell (MCFC), operating temperature: 650 o C and (3) the solid oxide fuel cell (SOFC), operating temperature: around 900 o C are best suited for decentralised combined heat and power (CHP) applications. This is due to the fact, that the heat of the exothermic reaction taking place in the fuel cell can be used in the domestic, commercial and industrial sector for heating and hot water or steam production. At the present time, gas-engines or gas-turbines are the preferred CHP-technologies for these applications. Nowadays, the PAFC is commercially available. More than 160 plants, each with a power of 200 kW, have been installed world-wide. Ruhrgas has investigated the behaviour of a 200 kW PAFC at its research centre in Dorsten, Germany, and at the site of a local utility. High temperature fuel cells such as MCFC or SOFC promise electrical efficiencies above 50 % in simple cycle mode. Up to now, MCFC-test plants have been built and operated in the 100 kW to 1 MW power range. The largest MCFC ever operated consisted of 16 identical stacks of 125 kW each, resulting in a plant power of 2 MW. The initial experience with SOFC in this power-range is currently gained from the operation of a 100 kW plant. In this paper, the result of the construction and operation of a highly innovatively designed 280 kW MCFC will be presented. This plant has been designed, built and operated by a European consortium for the development and market introduction of the MCFC. Members of the consortium are MTU-Friedrichshafen GmbH, Haldor Topsoee NS, Elkraft A.m.b.H., RWE Energie AG and Ruhrgas AG. (author)

  1. Design ampersand construction innovations of the defense waste processing facility

    International Nuclear Information System (INIS)

    McKibben, J.M.; Pair, C.R.; Bethmann, H.K.

    1990-01-01

    Construction of the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) is essentially complete. The facility is designed to convert high-level radioactive waste, now contained in large steel tanks as aqueous salts and sludge, into solid borosilicate glass in stainless steel canisters. All processing of the radioactive material and operations in a radioactive environment will be done remotely. The stringent requirements dictated by remote operation and new approaches to the glassification process led to the development of a number of first-of-a-kind pieces of equipment, new construction fabrication and erection techniques, and new applications of old techniques. The design features and construction methods used in the vitrification building and its equipment were to accomplish the objective of providing a state-of-the-art vitrification facility. 3 refs., 10 figs

  2. Environmental impact assessment of a package type IFAS reactor during construction and operational phases: a life cycle approach.

    Science.gov (United States)

    Singh, Nitin Kumar; Singh, Rana Pratap; Kazmi, Absar Ahmad

    2017-05-01

    In the present study, a life cycle assessment (LCA) approach was used to analyse the environmental impacts associated with the construction and operational phases of an integrated fixed-film activated sludge (IFAS) reactor treating municipal wastewater. This study was conducted within the boundaries of a research project that aimed to investigate the implementation related challenges of a package type IFAS reactor from an environmental perspective. Along with the LCA results of the construction phase, a comparison of the LCA results of seven operational phases is also presented in this study. The results showed that among all the inputs, the use of stainless steel in the construction phase caused the highest impact on environment, followed by electricity consumption in raw materials production. The impact of the construction phase on toxicity impact indicators was found to be significant compared to all operational phases. Among the seven operational phases of this study, the dissolved oxygen phase III, having a concentration of ∼4.5 mg/L, showed the highest impact on abiotic depletion, acidification, global warming, ozone layer depletion, human toxicity, fresh water eco-toxicity, marine aquatic eco-toxicity, terrestrial eco-toxicity, and photochemical oxidation. However, better effluent quality in this phase reduced the eutrophication load on environment.

  3. Case study on ventilation method development for Bar-Boljare highway tunnels construction in Montenegro

    Directory of Open Access Journals (Sweden)

    Cvjetić Aleksandar S.

    2017-01-01

    Full Text Available Sometimes tunnel construction is a necessity regardless of its purpose due to many reasons, to mention some of them: limited space, safe operation, environmental protection etc. In those cases, one of the main aspects concerning an appropriate design of a tunnel construction is site ventilation. Ventilation is required during the construction of any tunnel regardless of technology used to construct it. Three major construction ventilation schemes are typically applied. Which one will be use are often in dependency of the site requirements. In this paper is presented case study on ventilation method development for the highway tunnels construction and it includes ventilation solutions for tunnels ‘Suka’, ‘Vežešnik’, ‘Mrke’ and ‘Vjeternik’ during construction phase. The tunnels are part of the Bar-Boljare highway which is also a part of the Trans-European Highway (THE through the Republic of Montenegro.

  4. Argentinian experience in selecting sites for nuclear power stations

    International Nuclear Information System (INIS)

    Csik, B.J.

    1975-01-01

    One nuclear power station is in operation in the Republic of Argentina, a second is under construction, and the decision to build a third has been taken. According to existing plans, about ten nuclear power stations should go into operation during the next decade. The present paper analyses the experience acquired in selecting sites for the first units, commenting on the criteria and methods applied, the studies that were carried out, the specific problems encountered and the solutions adopted, as well as on the question of acceptance of the chosen sites by the public. It goes on to describe the current programme of selection and study of sites for future nuclear power stations

  5. Issues of construction health and safety in developing countries: a case of Jordan

    Directory of Open Access Journals (Sweden)

    Suhair Zaid Alkilani

    2013-09-01

    Full Text Available The construction industry is widely regarded as one of the most significant interms of its impact on health and safety (H&S. Recent findings suggestthat in developing countries H&S awareness and performance is low. In this paper,the current state of H&S on construction sites in Jordan was explored usinga two-part investigation. The first part introduces the area of research in aliterature based study of on-site safety. The second part is a case study onthe Jordanian construction industry and its current H&S practices. Primary datawas collected from field visits, expert interviews and semi-structuredquestionnaires. Supporting secondary data was collected from archival studiesand related research literature. The research findings highlight a lack of governmentcommitment exemplified by regulations, policies and legal constraints thatlimit the operational efficiency of those government departments responsiblefor H&S management, and hindering the development of good H&S practice.Research results also highlight the key constraints of good H&S practice fromthe perspective of construction contractors.The study concludes with discussion ofpotential solutions toimprove H&S performance on construction sites in Jordan.

  6. Nevada test site radionuclide inventory and distribution: project operations plan

    International Nuclear Information System (INIS)

    Kordas, J.F.; Anspaugh, L.R.

    1982-01-01

    This document is the operational plan for conducting the Radionuclide Inventory and Distribution Program (RIDP) at the Nevada Test Site (NTS). The basic objective of this program is to inventory the significant radionuclides of NTS origin in NTS surface soil. The expected duration of the program is five years. This plan includes the program objectives, methods, organization, and schedules

  7. Operational radioactive waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1980-11-01

    The Operational Radioactive Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  8. The ALICE Transition Radiation Detector: Construction, operation, and performance

    Science.gov (United States)

    Alice Collaboration

    2018-02-01

    The Transition Radiation Detector (TRD) was designed and built to enhance the capabilities of the ALICE detector at the Large Hadron Collider (LHC). While aimed at providing electron identification and triggering, the TRD also contributes significantly to the track reconstruction and calibration in the central barrel of ALICE. In this paper the design, construction, operation, and performance of this detector are discussed. A pion rejection factor of up to 410 is achieved at a momentum of 1 GeV/ c in p-Pb collisions and the resolution at high transverse momentum improves by about 40% when including the TRD information in track reconstruction. The triggering capability is demonstrated both for jet, light nuclei, and electron selection.

  9. ESPSD, Nuclear Power Plant Siting Database

    International Nuclear Information System (INIS)

    Slezak, S.

    2001-01-01

    1 - Description of program or function: This database is a repository of comprehensive licensing and technical reviews of siting regulatory processes and acceptance criteria for advanced light water reactor (ALWR) nuclear power plants. The program is designed to be used by applicants for an early site permit or combined construction permit/operating license (10CFRR522), Sub-parts A and C) as input for the development of the application. The database is a complete, menu-driven, self-contained package that can search and sort the supplied data by topic, keyword, or other input. The software is designed for operation on IBM compatible computers with DOS. 2 - Method of solution: The database is an R:BASE Runtime program with all the necessary database files included

  10. Mitigation for the Construction and Operation of Libby Dam, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2002-09-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.

  11. How to characterize a potential site for CO2 storage with sparse data coverage - a Danish onshore site case

    International Nuclear Information System (INIS)

    Nielsen, Carsten Moller; Frykman, Peter; Dalhoff, Finn

    2015-01-01

    The paper demonstrates how a potential site for CO 2 storage can be evaluated up to a sufficient level of characterization for compiling a storage permit application, even if the site is only sparsely explored. The focus of the paper is on a risk driven characterization procedure. In the initial state of a site characterization process with sparse data coverage, the regional geological and stratigraphic understanding of the area of interest can help strengthen a first model construction for predictive modeling. Static and dynamic modeling in combination with a comprehensive risk assessment can guide the different elements needed to be evaluated for fulfilling a permit application. Several essential parameters must be evaluated; the storage capacity for the site must be acceptable for the project life of the operation, the trap configuration must be efficient to secure long term containment, the injectivity must be sufficient to secure a longstanding stable operation and finally a satisfactory and operational measuring strategy must be designed. The characterization procedure is demonstrated for a deep onshore aquifer in the northern part of Denmark, the Vedsted site. The site is an anticlinal structural closure in an Upper Triassic - Lower Jurassic sandstone formation at 1 800-1 900 m depth. (authors)

  12. Optimum Operating Room Environment for the Prevention of Surgical Site Infections.

    Science.gov (United States)

    Gaines, Sara; Luo, James N; Gilbert, Jack; Zaborina, Olga; Alverdy, John C

    Surgical site infections (SSI), whether they be incisional or deep, can entail major morbidity and death to patients and additional cost to the healthcare system. A significant amount of effort has gone into optimizing the surgical patient and the operating room environment to reduce SSI. Relevant guidelines and literature were reviewed. The modern practice of surgical antisepsis involves the employment of strict sterile techniques inside the operating room. Extensive guidelines are available regarding the proper operating room antisepsis as well as pre-operative preparation. The use of pre-operative antimicrobial prophylaxis has become increasingly prevalent, which also presents the challenge of opportunistic and nosocomial infections. Ongoing investigative efforts have brought about a greater appreciation of the surgical patient's endogenous microflora, use of non-bactericidal small molecules, and pre-operative microbial screening. Systematic protocols exist for optimizing the surgical sterility of the operating room to prevent SSIs. Ongoing research efforts aim to improve the precision of peri-operative antisepsis measures and personalize these measures to tailor the patient's unique microbial environment.

  13. Design and construction of landslide preventive construction at Yamasubara hydroelectric power plant site. Yamasubata hatsudensho chiten ni okeru jisuberi taisaku koji no sekkei seko ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Takase, H; Ito, M; Sakata, M [The Kyushu Electric Power Co. Inc., Fukuoka (Japan)

    1993-07-30

    This paper reports the design and construction of landslide preventive construction at the site of the Yamasubara hydroelectric power plant (with a maximum output of 40,700 kW) and the result of slope stability verification after completion of the construction. The moderate slope on top of the primary slide has sands presumed to be colluvial deposit distributed with a depth of 10 m or more, where occurrence of a secondary slip was feared as triggered by the primary slide. The power plant protective constructions consisted of concrete walls to protect the entire power plant including buildings, and falling stone protective fences installed around the surge tanks. The temporary measures were so set that groundwater levels are lowered to a level that can assure the slide safety factor of 1.0 or more by means of drain boring using the down-the-hole hammer type. The permanent protective construction used rock anchors that are superior in constructability and economy. The stability of sliding slope faces was verified to confirm effects of the protective constructions. The verification included observations of groundwater level behavior, water well-up from drain holes, and movements in the slopes. The result showed that the protective constructions have give sufficient effects. Continued slope stability control is important. 16 figs., 7 tabs.

  14. NGNP Site Selection Status Report

    International Nuclear Information System (INIS)

    Holbrook, Mark

    2006-01-01

    This report provides an overview of the Nuclear Regulatory Commission (NRC) licensing process, the preliminary site activities that have taken place in the current fiscal year (FY-06), and the site-related plans for FY-07. The NRC maintains oversight of the construction and operation of a facility throughout its lifetime to assure compliance with the Commission's regulations for the protection of public health and safety, the common defense and security, and the environment. To implement this process, all nuclear power plant applications must undergo a safety review, an environmental review, and antitrust review by the NRC.

  15. Report of the Fermilab Committee for Site Studies

    Energy Technology Data Exchange (ETDEWEB)

    Steve Holmes, Vic Kuchler et. al.

    2001-09-10

    Fermilab is the flagship laboratory of the U.S. high-energy physics program. The Fermilab accelerator complex has occupied the energy frontier nearly continuously since its construction in the early 1970s. It will remain at the frontier until the Large Hadron Collider at CERN begins operating in 2006-7. A healthy future for Fermilab will likely require construction of a new accelerator in the post-LHC era. The process of identifying, constructing and operating a future forefront facility will require the support of the world high-energy-physics community, the governments and funding agencies of many nations and the people of surrounding communities. This report explores options for construction of a new facility on or near the existing Fermilab site. We began the study that forms the basis of this report with the idea that Fermilab, and the surrounding area of northeastern Illinois, possesses attributes that make it an attractive candidate for a new accelerator construction project: excellent geology; a Fermilab staff and local contractors who are experienced in subsurface construction; abundant energy supplies; good access to transportation networks; the presence of local universities with strong interest and participation in the Fermilab research program; Fermilab's demonstrated ability to mount large accelerator construction projects and operate complex accelerator facilities; and a surrounding community that is largely supportive of Fermilab's presence. Our report largely confirms these perceptions.

  16. Report of the Fermilab Committee for Site Studies

    International Nuclear Information System (INIS)

    Steve, Holmes; Vic, Kuchler

    2001-01-01

    Fermilab is the flagship laboratory of the U.S. high-energy physics program. The Fermilab accelerator complex has occupied the energy frontier nearly continuously since its construction in the early 1970s. It will remain at the frontier until the Large Hadron Collider at CERN begins operating in 2006-7. A healthy future for Fermilab will likely require construction of a new accelerator in the post-LHC era. The process of identifying, constructing and operating a future forefront facility will require the support of the world high-energy-physics community, the governments and funding agencies of many nations and the people of surrounding communities. This report explores options for construction of a new facility on or near the existing Fermilab site. We began the study that forms the basis of this report with the idea that Fermilab, and the surrounding area of northeastern Illinois, possesses attributes that make it an attractive candidate for a new accelerator construction project: excellent geology; a Fermilab staff and local contractors who are experienced in subsurface construction; abundant energy supplies; good access to transportation networks; the presence of local universities with strong interest and participation in the Fermilab research program; Fermilab's demonstrated ability to mount large accelerator construction projects and operate complex accelerator facilities; and a surrounding community that is largely supportive of Fermilab's presence. Our report largely confirms these perceptions

  17. Environmental assessment for construction and operation of a Human Genome Laboratory at Lawrence Berkeley Laboratory, Berkeley, California

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    Lawrence Berkeley Laboratory (LBL) proposes to construct and operate a new laboratory for consolidation of current and future activities of the Human Genome Center (HGC). This document addresses the potential direct, indirect, and cumulative environmental and human-health effects from the proposed facility construction and operation. This document was prepared in accordance the National Environmental Policy Act of 1969 (United States Codes 42 USC 4321-4347) (NEPA) and the US Department of Energy`s (DOE) Final Rule for NEPA Implementing Procedures [Code of Federal Regulations 10CFR 1021].

  18. On-site Labour Productivity of New Zealand Construction Industry: Key Constraints and Improvement Measures

    Directory of Open Access Journals (Sweden)

    Serdar Durdyev

    2011-09-01

    Full Text Available Productivity is key to the survival and growth of any organisation, industry or nation. Some factors constrain the achievement of the set project objectives in the New Zealand building and construction industry and are responsible for the reported steady decline of productivity and performance. This study aims to identify the key constraints to on-site labour productivity and improvement measures. Using the descriptive survey method, views of some project managers, contractors and subcontractors in New Zealand were canvassed via pilot interviews and questionnaire surveys at the qualitative and quantity data gathering stages, respectively. Multi-attribute technique was used to analyse the quantitative data. Results showed that the key external constraints to on-site labour productivity comprise, in order of decreasing impact, statutory compliance, unforeseen events and wider external dynamics. The internal constraints, which contribute 67 percent of the onsite productivity issues, comprise reworks, level of skill and experience of the workforce, adequacy of method of construction, buildability issues, and inadequate supervision and coordination. . The factors underlying each broad category of external and internal constraints are reported. The relative levels of impact of the identified constraints are expected to guide the project team in addressing the constraints in a cost-effective manner.

  19. Development of MCESC software for selecting the best stormwater erosion and sediment control measure in Malaysian construction sites

    Energy Technology Data Exchange (ETDEWEB)

    Al-Hadu, Ibrahiem Abdul Razak; Sidek, Lariyah Mohd [Civil Engineering Universiti Tenaga Nasional, Kajan, Selangor (Malaysia); Desa, Mohamed Nor Mohamed; Basri, Noor Ezlin Ahmad [Civil and Structural Engineering, Universiti Kebangsaan Malaysia, Bangi, Selangor (Malaysia)

    2012-07-01

    Malaysia located in a tropical region which is interested with a heavy rainfall through the whole seasons of the year. Construction stages usually associated with soil disturbing due to land clearing and grading activities, this combined with the tropical climate in Malaysia, will generate an enormous amount of soil to be eroded and then deposited into the adjacent water bodies. There are many kinds of mitigation measures used so as to reduce the impact of erosion and sedimentation that are generated due to the stormwater in construction sites. This paper aims to develop and apply Multi Criteria Analysis (MCA) software called Multi Criteria Erosion and Sediment Control (MCESC) software in which it can be applied in selecting the best stormwater control measure by depending on specified criteria and criterion weight. Visual Basic 6 was adopted as a development tool. This software can help the engineers, contractors on site and decision makers to find the best stormwater control measure in any construction site in Malaysia. Users of the MCESC software are given the opportunity to select the best stormwater control measure via expert's judgments that are built in the system or via their own expertise. MCESC software has many benefits since the experts are not always available and the consultancy is a costly issue which add further financial allocations to the project.

  20. Case study of restaurant successfully designed, constructed, and operated for excellent dining acoustics

    Science.gov (United States)

    Bollard, Paul; Des Jardins, Stephen

    2005-09-01

    Prior to the construction of La Provence Restaurant in Roseville, California in 2004, the owner, Stephen Des Jardins, traveled with his cook, architect, and engineer to the Provence Region of France to study the cuisine, architecture, and acoustics of the local restaurants. This information was incorporated into the design, construction, and operation of his restaurant, with acoustical design assistance provided by the author, Paul Bollard. The result of the owner's painstaking attention to detail is a restaurant which has received very positive reviews for its architecture, quality of food, service, and acoustic ambience. This paper documents the measures included in the construction of the restaurant to ensure that the building acoustics enhance the dining experience, rather than detract from it. Photographs of acoustic treatments are included, as are reverberation time (RT60) test results and ambient noise level measurement results.

  1. Siting nuclear power plants

    International Nuclear Information System (INIS)

    Yellin, J.; Joskow, P.L.

    1980-01-01

    The first edition of this journal is devoted to the policies and problems of siting nuclear power plants and the question of how far commercial reactors should be placed from urban areas. The article is divided into four major siting issues: policies, risk evaluation, accident consequences, and economic and physical constraints. One concern is how to treat currently operating reactors and those under construction that were established under less-stringent criteria if siting is to be used as a way to limit the consequences of accidents. Mehanical cost-benefit analyses are not as appropriate as the systematic use of empirical observations in assessing the values involved. Stricter siting rules are justified because (1) opposition because of safety is growing: (2) remote siting will make the industry more stable; (3) the conflict is eliminated between regulatory policies and the probability basis for nuclear insurance; and (4) joint ownership of utilities and power-pooling are increasing. 227 references, 7 tables

  2. Construction safety

    CERN Document Server

    Li, Rita Yi Man

    2013-01-01

    A close-to-ideal blend of suburb and city, speedy construction of towers of Babylon, the sparkling proportion of glass and steel buildings’ facade at night showcase the wisdom of humans. They also witness the footsteps, sweats and tears of architects and engineers. Unfortunately, these signatures of human civilizations are swathed in towering figures of construction accidents. Fretting about these on sites, different countries adopt different measures on sites. This book firstly sketches the construction accidents on sites, followed by a review on safety measures in some of the developing countries such as Bermuda, Egypt, Kuwait and China; as well as developed countries, for example, the United States, France and Singapore. It also highlights the enormous compensation costs with the courts’ experiences in the United Kingdom and Hong Kong.

  3. Historical genesis of Hanford Site wastes

    International Nuclear Information System (INIS)

    Gerber, M.S.

    1991-01-01

    This paper acquaints the audience with historical waste practices and policies as they changed over the years at the Hanford Site, and with the generation of the major waste streams of concern in Hanford Site clean-up today. The paper also describes the founding and basic operating history of the Hanford Site, including World War 11 construction and operations, three major postwar expansions (1947-55), the peak years of production (1956-63), production phase downs (1964-the present), and some past suggestions and efforts to chemically treat, open-quotes fractionate,close quotes and/or immobilize Hanford's wastes. Recent events, including the designation of the Hanford Site as the open-quotes flagshipclose quotes of Department of Energy (DOE) waste remediation efforts and the signing of the landmark Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), have generated new interest in Hanford's history. Clean-up milestones dictated in this agreement demand information about how, when, in what quantities and mixtures, and under what conditions, Hanford Site wastes were generated and released. This paper presents original, primary-source research into the waste history of the Hanford Site. The earliest, 1940s knowledge base, assumptions and calculations about radioactive and chemical discharges, as discussed in the memos, correspondence and reports of the original Hanford Site (then Hanford Engineer Works) builders and operators, are reviewed. The growth of knowledge, research efforts, and subsequent changes in Site waste disposal policies and practices are traced. Finally, the paper places the current Hanford Site waste remediation endeavors in the broad context of American and world history

  4. Transport of the Hadronic Forward (HF) calorimeter from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France.

    CERN Multimedia

    Florelle Antoine

    2006-01-01

    The two halves of the Forward Hadronic Calorimeter (HF) were transported from the CERN Meyrin site to the surface assembly hall at LHC Point 5 in Cessy, France, during the first part of July. Transporting these 300 tonne objects involved the construction around them of a 65-metre long trailer, simultaneously pushed and pulled by two trucks at either end. The main road between St. Genis and Cessy was closed during these operations and a police escort was provided for the ~5 hour journeys. The two HF halves will be the first major elements to be lowered by the gantry crane into the underground experimental cavern around the end of July or beginning of August.

  5. 78 FR 61389 - Sanyo Solar of Oregon, LLC, Wafer Slicing and Quality Control Operations, Including On-Site...

    Science.gov (United States)

    2013-10-03

    ..., LLC, Wafer Slicing and Quality Control Operations, Including On-Site Leased Workers From Brown and... Quality Control Operations, Salem, Oregon, including on-site leased workers from Brown and Dunton, Inc... and included workers who supplied quality control and support functions. The company reports that...

  6. Vertex operator construction of superconformal ghosts and string field theory

    International Nuclear Information System (INIS)

    Ezawa, Z.F.; Nakamura, S.; Tezuka, A.

    1987-01-01

    Superconformal ghosts in string theories are characterized by the SU(1,1) Kac-Moody algebra with central charge -1/2. These ghost fields are constructed as the vertex operators realizing spinor representations of the Kac-Moody algebra. Representations of the canonical commutation relations of the superconformal ghosts are analyzed extensively. All irreducible representations are found to possess only the trivial inner product but for one exceptional case. Consequently, in superstring field theory it is necessary to consider reducible representations in general. Hilbert spaces with a non-trivial inner product are explicitly obtained upon which second quantization of superstring may be carried out. (orig.)

  7. Making the error-controlling algorithm of observable operator models constructive.

    Science.gov (United States)

    Zhao, Ming-Jie; Jaeger, Herbert; Thon, Michael

    2009-12-01

    Observable operator models (OOMs) are a class of models for stochastic processes that properly subsumes the class that can be modeled by finite-dimensional hidden Markov models (HMMs). One of the main advantages of OOMs over HMMs is that they admit asymptotically correct learning algorithms. A series of learning algorithms has been developed, with increasing computational and statistical efficiency, whose recent culmination was the error-controlling (EC) algorithm developed by the first author. The EC algorithm is an iterative, asymptotically correct algorithm that yields (and minimizes) an assured upper bound on the modeling error. The run time is faster by at least one order of magnitude than EM-based HMM learning algorithms and yields significantly more accurate models than the latter. Here we present a significant improvement of the EC algorithm: the constructive error-controlling (CEC) algorithm. CEC inherits from EC the main idea of minimizing an upper bound on the modeling error but is constructive where EC needs iterations. As a consequence, we obtain further gains in learning speed without loss in modeling accuracy.

  8. A Systems Engineering Framework for Design, Construction and Operation of the Next Generation Nuclear Plant

    International Nuclear Information System (INIS)

    Edward J. Gorski; Charles V. Park; Finis H. Southworth

    2004-01-01

    Not since the International Space Station has a project of such wide participation been proposed for the United States. Ten countries, the European Union, universities, Department of Energy (DOE) laboratories, and industry will participate in the research and development, design, construction and/or operation of the fourth generation of nuclear power plants with a demonstration reactor to be built at a DOE site and operational by the middle of the next decade. This reactor will be like no other. The Next Generation Nuclear Plant (NGNP) will be passively safe, economical, highly efficient, modular, proliferation resistant, and sustainable. In addition to electrical generation, the NGNP will demonstrate efficient and cost effective generation of hydrogen to support the President's Hydrogen Initiative. To effectively manage this multi-organizational and technologically complex project, systems engineering techniques and processes will be used extensively to ensure delivery of the final product. The technological and organizational challenges are complex. Research and development activities are required, material standards require development, hydrogen production, storage and infrastructure requirements are not well developed, and the Nuclear Regulatory Commission may further define risk-informed/performance-based approach to licensing. Detailed design and development will be challenged by the vast cultural and institutional differences across the participants. Systems engineering processes must bring the technological and organizational complexity together to ensure successful product delivery. This paper will define the framework for application of systems engineering to this $1.5B - $1.9B project

  9. 4D modeling in high-rise construction

    Directory of Open Access Journals (Sweden)

    Balakina Anastasiya

    2018-01-01

    Full Text Available High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  10. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a)

  11. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a)

  12. Design, construction and initial state of the underground openings

    International Nuclear Information System (INIS)

    2010-12-01

    The report is included in a set of Production reports, presenting how the KBS-3 repository is designed, produced and inspected. The set of reports is included in the safety report for the KBS-3 repository and repository facility. The report provides input on the initial state of the underground openings for the assessment of the long-term safety, SR-Site. The initial state refers to the properties of the underground openings at final disposal, backfilling or closure. In addition, the report provides input to the operational safety report, SR-Operation, on how the underground openings shall be constructed and inspected. The report presents the design premises and the methodology applied to design the underground openings and adapt them the to the site conditions so that they conform to the design premises. It presents the reference design at Forsmark and its conformity to the design premises. It also describes the reference methods to be applied to construct and inspect the different kinds of underground openings. Finally, the initial state of the underground openings and its conformity to the design premises is presented

  13. Design, construction and initial state of the underground openings

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    The report is included in a set of Production reports, presenting how the KBS-3 repository is designed, produced and inspected. The set of reports is included in the safety report for the KBS-3 repository and repository facility. The report provides input on the initial state of the underground openings for the assessment of the long-term safety, SR-Site. The initial state refers to the properties of the underground openings at final disposal, backfilling or closure. In addition, the report provides input to the operational safety report, SR-Operation, on how the underground openings shall be constructed and inspected. The report presents the design premises and the methodology applied to design the underground openings and adapt them the to the site conditions so that they conform to the design premises. It presents the reference design at Forsmark and its conformity to the design premises. It also describes the reference methods to be applied to construct and inspect the different kinds of underground openings. Finally, the initial state of the underground openings and its conformity to the design premises is presented

  14. Technical documentation in support of the project-specific analysis for construction and operation of the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Lazaro, M.A.; Vinikour, W. [Argonne National Lab., IL (United States). Environmental Assessment Div.; Allison, T. [Argonne National Lab., IL (United States). Decision and Information Sciences Div.] [and others

    1996-09-01

    This document provides information that supports or supplements the data and impact analyses presented in the National Ignition Facility (NIF) Project-Specific Analysis (PSA). The purposes of NIF are to achieve fusion ignition in the laboratory for the first time with inertial confinement fusion (ICF) technology and to conduct high- energy-density experiments ins support of national security and civilian application. NIF is an important element in the DOE`s science-based SSM Program, a key mission of which is to ensure the reliability of the nation`s enduring stockpile of nuclear weapons. NIF would also advance the knowledge of basic and applied high-energy- density science and bring the nation a large step closer to developing fusion energy for civilian use. The NIF PSA includes evaluations of the potential environmental impacts of constructing and operating the facility at one of five candidate site and for two design options.

  15. Environmental impact of ongoing operation

    International Nuclear Information System (INIS)

    Henry, L.C.

    1980-07-01

    Present technology in the management of uranium mine and mill wastes, coupled with appropriate site selection, quality construction and good operating procedures, can ensure that impacts on health, safety and the environment will be acceptably low over the period of operation. The methods of chemical and physical stabilization of the tailings and retention structures are also compatible with close-out procedures and will ensure that any releases to the environment will continue to be within the requirements, assuming the continued availability of surveillance

  16. Applying Sensor-Based Technology to Improve Construction Safety Management.

    Science.gov (United States)

    Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng

    2017-08-11

    Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions.

  17. Remedial investigation/feasibility study work plan for the 100-BC-5 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Tri-Party Agreement requires that the cleanup programs at the Hanford Site integrate the requirements of CERCLA, RCRA, and Washington State's dangerous waste (the state's RCRA-equivalent) program. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  18. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Pwer Station

    International Nuclear Information System (INIS)

    Ueyama, Koreyasu

    1982-01-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported. (Wakatsuki, Y.)

  19. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Ueyama, Koreyasu [Tokyo Electric Power Co., Inc. (Japan)

    1982-09-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported.

  20. BR3/Vulcain Nuclear Power Station. Construction and Operational Experience

    Energy Technology Data Exchange (ETDEWEB)

    Storrer, J. [Belgonucleaire, S.A., Brussels (Belgium)

    1968-04-15

    A full-scale reactor experiment was set out as the main objective of the Vulcain research and development programme agreed in May 1962 between the UKAEA and BelgoNucleaire, manager of ''Syndicat Vulcain''. Vulcain uses variable moderation as the long-term method to control reactivity: the reactor is cooled and moderated by a mixture of heavy and light water, the D{sub 2}O content being stepwise reduced to permit power operation with all control rods completely out of the core. To carry out the Vulcain power experiment it was decided to modify the BR3 nuclear power plant located at Mol, Belgium, which had operated from 1962 to 1964 as a conventional PWR with outputs of 40.9 MW(th) and 11.45 MW(e). The BR3/Vulcain plant was started in December 1966 and since then is running with a load factor around 90%. It is the first time that such a reactor type has been built and operated and the experience gained by its design, construction, commissioning and operation has proven to be most valuable. D{sub 2}O is being used at a pressure (2000 lb/in{sup 2} abs.) never before achieved in a heavy-water reactor and the leak rate from the HP primary systems to the atmosphere has been kept to a negligible value, around 1 to 2 grams/h. Commissioning of the primary plant had been carried out with light water first without fuel, and thereafter with fuel, at which time the water was poisoned with boric acid. The reactor vessel contains experimental devices such as 65 in-pile instrumentation detectors and four hydraulically operated Zircaloy control rods. They required the interposition of a collar between the vessel and its lid. Refuelling is performed under boronated light water, the interchange between the primary water and the H{sub 2}O being carried out by means of a draining and spraying system. The reactor had been operated for two years before its modifications for Vulcain: many lessons have therefore been learned about working on irradiated systems. The BR3/Vulcain core has a