WorldWideScience

Sample records for site texas final

  1. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    International Nuclear Information System (INIS)

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete

  2. Radiological surveillance of Remedial Action activities at the processing site, Falls City, Texas. Final report

    International Nuclear Information System (INIS)

    1993-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project's Technical Assistance Contractor (TAC) performed a radiological surveillance of the Remedial Action Contractor (RAC), MK-Ferguson and CWM Federal Environmental Services, Inc., at the processing site in Falls City, Texas. This surveillance was conducted March 22--26, 1993. No findings were identified during the surveillance. Three site-specific observations and three programmatic observations are presented in this report. The overall conclusion from the surveillance is that the radiological aspects of the Falls City, Texas, remedial action program are performed adequately. However, some of the observations identify that there is potential for improving certain aspects of the occupational radiological air sampling, ensuring analytical data quality, and in communicating with the DOE and TAC on the ore sampling methods. The TAC has also received and is currently reviewing the RAC's responses regarding the observations identified during the radiological surveillance performed October 29--30, 1992

  3. Technical procedures for land use, Deaf Smith County site, Texas: Environmental Field Program: Final draft

    International Nuclear Information System (INIS)

    1987-09-01

    This volume contains Technical Procedures pursuant to the Land Use Site Study Plan including land use data acquisition, land use/land cover map compilation, verification of land use/land cover map accuracy, and land use/land cover data analysis. 22 refs., 5 figs

  4. Technical procedures for ecology: Environmental field program, Deaf Smith County Site, Texas: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    This volume contains Technical Procedures pursuant to the Land Use Site Study Plan including walkover surveys for threatened, endangered, or candidate species; vegetation classification and mapping; reclamation planning; wetland and floodplain determination and characterization of playas; wildlife habitat mapping methods; mammal sampling; bird survey methods; reptile and amphibian survey methods; preexisting environmental; stress and disturbance studies methods; voucher specimens for plants; and voucher specimens to wildlife. 9 refs., 5 figs., 1 tab

  5. Technical procedures for utilities and solid waste: Environmental Field Program, Deaf Smith County site, Texas: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    The evaluation of environmental issues and concerns and the addressing of statutory requirements are fundamental parts in the characterization of the site in Deaf Smith County, Texas for the US Department of Energy's Salt Repository Project (SRP). To ensure that the environmental field program comprehensively addresses the issues and requirements of the project, a site study plan (SSP) has been prepared for Utilities and Solid Waste considerations. This technical procedure (TP) has been developed to implement the field program described in the Utilities and Solid Waste Site Study Plan. The purpose and scope of the Utilities and Solid Waste Technical Procedure is to develop and implement a data collection procedure to fulfill the data base needs of the Utilities and Solid Waste SSP. The procedure describes a method of obtaining, assessing and verifying the capabilities of the regional service utilities and disposal contractors. This data base can be used to identify a preferred service source for the engineering contractor. The technical procedure was produced under the guidelines established in Technical Administrative Procedure No. 1.0, Preparation, Review and Approval of Technical Procedures

  6. Technical procedures for water resources: Volume 3, Environmental Field Program, Deaf Smith County Site, Texas: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    To ensure that the environmental field program comprehensively addresses the issues and requirements of the project, a site study plan (SSP) has been prepared for Water Resources (ONWI, 1987). This technical procedure (TP) has been developed to implement the field program described in the Water Resources Site Study Plan. This procedure provides the general method for the field collection of water and sediment samples from playa lakes using an Alpha horizontal type sampler or equivalent or a peristaltic pump for water and a KB-coring devise or ponar grab for sediments. The samples will be preserved and then shipped to a laboratory for analysis. The water quality and sediment samples will be collected as part of the surface-water quality field study described in the Site Plan for Water Resources. 15 refs., 5 figs., 3 tabs

  7. Technical procedures for water resources: Volume 4, Deaf Smith County site, Texas: Environmental Field Program: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    This volume contains Technical Procedures pursuant to the water Resources Site Study Plan: including Collection, Preservation, and Shipment of Ground-Water Samples; Inventory Current Water Use and Estimating Projected Water Use; Estimation of Precipitation Depth, Duration, Frequence; Estimation of Probable Maximum Precipitation; Calculation of Floodplains

  8. Technical procedures for water resources, Deaf Smith County site, Texas: Volume 1: Environmental Field Program: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    This volume contains Technical Procedures pursuant to the Water Resources Site Study Plan including, determination of basin topographic characteristics, determination of channel and playa lake characteristics, operation of a stream gaging station, operation of a playa lake stage gaging system, and processing of data from a playa lake stage gaging system

  9. Technical procedures for water resources, Deaf Smith County site, Texas: Volume 2: Environmental Field Program: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    This volume contains the following Technical Procedures pursuant to the Water Resources Site Study Plan operation of a Playa Lake conductivity monitoring station and processing of data from a Playa Lake conductivity monitoring station. This procedure defines steps and methods for the installation, operation, and maintenance of the Playa Lake conductivity monitoring stations. Conductivity measurements will be taken at six playa lakes in the site study area to record changes in total dissolved solids as a function of stage. Playa lake conductivity and stage (volume) measurements will be used, in conjunction with other water quality data collected at the Playa Lake and precipitation stations, to determine the mass of dissolved solids entering and leaving the playas. This baseline information on the pollutant mass balance of the playas will be used to assess potential changes in playa lake water quality and the magnitude of those changes due to site development. The pollutant mass balances will also be used on determining the source of pollutants. 2 refs., 5 figs

  10. Environmental assessment: Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and the eight other potentially sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines. On the basis of these findings, the DOE is nominating the Deaf Smith County site as one of the five sites suitable for characterization. 591 refs., 147 figs., 173 tabs

  11. Environmental assessment: Deaf Smith County site, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and the eight other potentially sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines. On the basis of these findings, the DOE is nominating the Deaf Smith County site as one of the five sites suitable for characterization. 591 refs., 147 figs., 173 tabs.

  12. Environmental assessment: Deaf Smith County site, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of the nine potentially acceptable sites for mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines.

  13. Environmental assessment: Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of the nine potentially acceptable sites for mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines

  14. Status of the Texas low-level radioactive waste disposal site - construction sequencing and staffing patterns

    International Nuclear Information System (INIS)

    Jacobi, L.R. Jr.

    1996-01-01

    The Texas Low-Level Radioactive Waste Disposal Authority, an agency of the State of Texas, has been attempting to develop a site for the disposal of low-level radioactive waste in Texas for more than fourteen years. Since 1991, the agency has been evaluating a site near Sierra Blanca, in far west Texas. Site characterization was completed in 1992, and a license application was filed that year. Construction plans were completed in 1993. In April 1996, the licensing agency, the Texas Natural Resource Conservation Commission, completed its review and proposed to issue a license. The administrative hearings on the proposed license should be completed by July 1997. The Authority is prepared to begin construction and operations as soon as a final license can be issued

  15. Description of floodplains and wetlands, Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    1986-11-01

    Floodplains and wetlands are important features of the Texas Panhandle landscape, and are found on the Deaf Smith County site and in its vicinity. Use or disturbance of floodplains and wetlands in relation to the Civilian Radioactive Waste Management Program is subject to environmental review requirements implementing two Executive Orders. This report provides general information on playa wetlands in the Texas Panhandle, and describes and maps floodplains and wetlands on the Deaf Smith site and in its vicinity. The report is based on the published literature, with information from limited field reconnaissance included

  16. Environmental assessment, Deaf Smith County site, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1986-05-01

    The Nuclear Waste Policy Act of 1982 (42 USC sections 10101-10226) requires the environmental assessment of a proposed site to include a statement of the basis for nominating a site as suitable for characterization. Volume 2 provides a detailed statement evaluating the site suitability of the Deaf Smith County Site under DOE siting guidelines, as well as a comparison of the Deaf Smith County Site to the other sites under consideration. The evaluation of the Deaf Smith County Site is based on the impacts associated with the reference repository design, but the evaluation will not change if based on the Mission Plan repository concept. The second part of this document compares the Deaf Smith County Site to Davis Canyon, Hanford, Richton Dome and Yucca Mountain. This comparison is required under DOE guidelines and is not intended to directly support subsequent recommendation of three sites for characterization as candidate sites. 259 refs., 29 figs., 66 refs. (MHB)

  17. Environmental assessment, Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    1986-05-01

    The Nuclear Waste Policy Act of 1982 (42 USC sections 10101-10226) requires the environmental assessment of a proposed site to include a statement of the basis for nominating a site as suitable for characterization. Volume 2 provides a detailed statement evaluating the site suitability of the Deaf Smith County Site under DOE siting guidelines, as well as a comparison of the Deaf Smith County Site to the other sites under consideration. The evaluation of the Deaf Smith County Site is based on the impacts associated with the reference repository design, but the evaluation will not change if based on the Mission Plan repository concept. The second part of this document compares the Deaf Smith County Site to Davis Canyon, Hanford, Richton Dome and Yucca Mountain. This comparison is required under DOE guidelines and is not intended to directly support subsequent recommendation of three sites for characterization as candidate sites. 259 refs., 29 figs., 66 refs

  18. Site-specific design of the super collider in Texas

    International Nuclear Information System (INIS)

    Laughton, C.; Nelson, P.P.; Lundin, T.K.

    1990-01-01

    This paper outlines the scope of the Superconducting Super Collider (SSC) in Texas, underground works and present the current accelerator layout. After a brief overview of the site geotechnical characteristics, emphasis will be placed upon the possibilities for the incorporation of mechanical excavation technology into the construction of the various underground structures

  19. Wildlife Contact Rates at Artificial Feeding Sites in Texas

    Science.gov (United States)

    Campbell, Tyler A.; Long, David B.; Shriner, Susan A.

    2013-06-01

    Given the popularity of feeding white-tailed deer ( Odocoileus virginianus) in Texas and the increasing amount of corn that is distributed, more information is needed on the impacts of this activity on non-target wildlife. Our objectives were to report visitation, intra- and interspecific contact, and contact rates of wildlife at artificial feeding sites in Texas. Our study was conducted at three sites in Kleberg and Nueces counties, Texas. We trapped animals from February to April and August to September, 2009 and marked animals with passive integrated transponder (PIT) tags. At each site and season, we placed one feeder system containing a PIT tag reader within 600 m of trap locations. Readers detected PIT tags from a distance of 25 cm. We determined a contact event to occur when two different PIT tags were detected by feeder systems within 5 s. We recorded 62,719 passes by raccoons ( Procyon lotor), 103,512 passes by collared peccaries ( Pecari tajacu), 2,923 passes by feral swine ( Sus scrofa), 1,336 passes by fox squirrels ( Sciurus niger), and no passes by opossums ( Didelphis virginiana) at feeder systems. For site-season combinations in which contact events occurred, we found intraspecific contact rates (contacts per day) for raccoons, collared peccaries, and feral swine to be 0.81-124.77, 0.69-38.08, and 0.0-0.66, respectively. Throughout our study we distributed ~2,625 kg of whole kernel corn, which resulted in 6,351 contact events between marked wildlife (2.4 contacts per kg of corn). If 136 million kg of corn is distributed in Texas annually, we would expect >5.2 billion unnatural contact events between wildlife would result from this activity each year in Texas. Consequently, we do not believe that it is wise for natural resource managers to maintain artificial feeding sites for white-tailed deer or other wildlife due to pathogen transmission risks.

  20. Environmental assessment overview, Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines. On the basis of these findings, the DOE is nominating the Deaf Smith County site as one of five sites suitable for characterization. 3 figs

  1. Permian Basin, Texas: Volume 1, Text: Final preliminary design report

    International Nuclear Information System (INIS)

    1988-01-01

    This report is a description of the preliminary design for an Exploratory Shaft Facility (ESF) at the proposed 49 acre site located 21 miles north of Hereford, Texas in Deaf Smith County. Department of Energy must conduct in situ testing at depth to ascertain the engineering and environmental suitability of the site for further consideration for nuclear waste repository development. The ESF includes the construction of two 12-ft diameter engineered shafts for accessing the bedded salt horizon to conduct in situ tests to ascertain if the site should be considered a candidate site for the first High Level Nuclear Waste Repository. This report includes pertinent engineering drawings for two shafts and all support facilities necessary for shaft construction and testing program operation. Shafts will be constructed by conventional drill-and-blast methods employing ground freezing prior to shaft construction to stabilize the existing groundwater and soil conditions at the site. A watertight liner and seal system will be employed to prevent intermingling of aquifers and provide a stable shaft throughout its design life. 38 refs., 37 figs., 14 tabs

  2. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report, attachment 2, geology report; attachment 3, groundwater hydrology report; and attachment 4, water resources protection strategy. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the U.S. Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  3. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report, attachment 2, geology report; attachment 3, groundwater hydrology report; and attachment 4, water resources protection strategy. Final report

    International Nuclear Information System (INIS)

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the U.S. Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas

  4. Draft environmental assessment: Swisher County site, Texas. Nuclear Waste Policy Act (Section 112)

    International Nuclear Information System (INIS)

    1984-12-01

    In February 1983, the US Department of Energy (DOE) identified a location in Swisher County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. The potentially acceptable site was subsequently narrowed to an area of 9 square miles. To determine their suitability, the Swisher site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. These evaluations are reported in this draft environmental assessment (EA), which is being issued for public review and comment. The DOE findings and determinations that are based on these evaluations are preliminary and subject to public review and comment. A final EA will be prepared after considering the comments received. On the basis of the evaluations contained in this draft EA, the DOE has found that the Swisher site is not disqualified under the guidelines. The site is contained in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site - the Deaf Smith site. Although the Swisher site appears to be suitable for site characterization, the DOE has concluded that the Deaf Smith site is the preferred site in the Permian Basin and is proposing to nominate the Deaf Smith site rather than the Swisher site as one of the five sites suitable for characterization

  5. Texas transportation planning for future renewable energy projects : final report.

    Science.gov (United States)

    2017-03-01

    There will be a significant increase in the number of renewable energy production facilities in Texas. The : construction of wind farms requires the transport of wind turbine components that create increased loads on : rural roads and bridges. These ...

  6. Site specific statutory compliance planning for the salt repository project at the Deaf Smith County Site, Texas: Requirements, strategy, and status: Revision 4

    International Nuclear Information System (INIS)

    1986-06-01

    This document and the requirements and actions it presents are addressed to the Deaf Smith County Site, Texas. The proposed actions upon which the plan is based are those described in Chapters 4 and 5 of the final EA for the site. Similarly, the environmental and health and safety requirements covered in the plan are those identified in the EA as being potentially applicable to the salt repository project at the Deaf Smith site. 12 figs., 8 tabs

  7. Draft environmental assessment: Deaf Smith County site, Texas. Nuclear Waste Policy Act (Section 112)

    International Nuclear Information System (INIS)

    1984-12-01

    In February 1983, the US Department of Energy identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. The potentially acceptable site was subsequently narrowed to an area of 9 square miles. To determine their suitability, the Deaf Smith site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. These evaluations are reported in this draft environmental assessment, which is being issued for public review and comment. The DOE findings and determinations that are based on these evaluations are preliminary and subject to public review and comment. A final EA will be prepared after considering the comments received. On the basis of the evaluations reported in this draft EA, the DOE has found that the Deaf Smith site is not disqualified under the guidelines. The site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site - the Swisher site. Although the Swisher site appears to be suitable for site characterization, DOE has concluded that the Deaf Smith site is the preferred site. The DOE finds that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is proposing to nominate the Deaf Smith site as one of five sites suitable for characterization. Having compared the Deaf Smith site with the other four sites proposed for nomination, the DOE has determined that the Deaf Smith site is one of the three preferred sites for recommendation to the President as candidates for characterization

  8. Texas Hydrogen Education Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hitchcock, David; Bullock, Dan

    2011-06-30

    The Texas Hydrogen Education project builds on past interest in hydrogen and fuel cells to help create better informed leaders and stakeholders and thereby improve decision making and planning for inclusion of hydrogen and fuel cell technologies as energy alternatives in Texas. In past years in Texas, there was considerable interest and activities about hydrogen and fuel cells (2000-­2004). During that time, the Houston Advanced Research Center (HARC) created a fuel cell consortium and a fuel cell testing lab. Prior to 2008, interest and activities had declined substantially. In 2008, in cooperation with the Texas H2 Coalition and the State Energy Conservation Office, HARC conducted a planning process to create the Texas Hydrogen Roadmap. It was apparent from analysis conducted during the course of this process that while Texas has hydrogen and fuel cell advantages, there was little program and project activity as compared with other key states. Outreach and education through the provision of informational materials and organizing meetings was seen as an effective way of reaching decision makers in Texas. Previous hydrogen projects in Texas had identified the five major urban regions for program and project development. This geographic targeting approach was adopted for this project. The project successfully conducted the five proposed workshops in four of the target metropolitan areas: San Antonio, Houston, Austin, and the Dallas-­Ft. Worth area. In addition, eight outreach events were included to further inform state and local government leaders on the basics of hydrogen and fuel cell technologies. The project achieved its primary objectives of developing communication with target audiences and assembling credible and consistent outreach and education materials. The major lessons learned include: (1) DOE’s Clean Cities programs are a key conduit to target transportation audiences, (2) real-­world fuel cell applications (fuel cell buses, fuel cell fork lifts

  9. Site study plan for Transportation, Deaf Smith County Site, Texas: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    This site study plan describes transportation field studies to be conducted during the characterization of the Deaf Smith County, Texas, site for the US Department of Energy's Salt Repository Project. The studies are needed to identify and assess potential project impacts to transportation infrastructure and systems in the project vicinity and along potential transportation routes to the site across the State of Texas. The studies are also needed to locate and design project transportation facilities, and to evaluate and design impact mitigation. After identifying the transportation information requirements needed to comply with Federal, State, and local regulations and repository program requirements, the site study plan describes the study design and rationale, the field data collection procedures and equipment, the data analysis methods and application of results, the data management strategy, the schedule of field activities, the management of the study, and the study's quality assurance program. The field data collection activities are organized into programs for the characterization of site vicinity rail corridors and highway corridors, characterization of alternative statewide transportation routes, monitoring of site characterization effects on transportation, characterization of aircraft overflight patterns and hazardous material transportation patterns, and assessment of emergency response preparedness along alternative statewide transportation routes. 34 refs., 10 figs., 2 tabs

  10. Development of a low level radioactive waste disposal site in Texas - 1994 status

    International Nuclear Information System (INIS)

    Jacobi, L.R. Jr.

    1995-01-01

    The Texas Low Level Radioactive Waste Disposal Authority, an agency of the State of Texas, has been trying to develop a site for the disposal of low level radioactive waste in Texas for over ten years. Since 1991, the agency has been evaluating a site near Sierra Blanca, in far west Texas. Site characterization has been completed and a license application has been filed with the Texas Natural Resource Conservation Commission. Construction plans were completed in 1993, and the agency is prepared to begin construction and operations as soon as a license can be issued. Development costs for the site are borne by the utility companies and other major generators in Texas through the assessment of a planning and implementation fee. Total costs to date are approximately $26 million. As the project moves toward completion, state and national anti-nuclear activist groups have become more involved in attempts to thwart the Texas government's effort to solve the radioactive waste problem. To counter this increased opposition, the Texas utility companies and medical radioactive waste generators have also become more active in responding to these groups. This has been very helpful and is in keeping with the elements of building block 12 of the Nuclear Power Oversight Committee's Strategic Plan for Building New Nuclear Power Plants. This paper and poster session look at the schedule, design, and long term prospects for ultimate success of the project

  11. Preliminary site characterization - final report

    Energy Technology Data Exchange (ETDEWEB)

    Clark, D.; Smith, L.B.

    1993-12-01

    This report summarizes the ecological unit reconnaissance conducted at the F-Area Burning/Rubble Pit(s) RCRA/CERCLA Unit (F-Area BRP) on August 30 and 31, 1993 as part of the RFI/RI baseline risk assessment for the waste unit The baseline risk assessment will assess the potential endangerment to human health and the environment associated with the unit and will be used to evaluate remediation criteria, if needed. The information presented in this report will be used in subsequent stages of the ecological risk assessment to refine the conceptual site model, assist in the selection of contaminants of concern, identify potential ecological receptors, and evaluate trophic relationships and other exposure pathways. The unit reconnaissance survey was conducted in accordance with Specification No. E-18272, Rev. 1 dated August 5, 1993, and the Draft {open_quotes}Ecological Risk Assessment Program Plan for Evaluation of Waste Sites on the Savannah River Site{close_quotes}. The objectives of the site reconnaissance were to: Assess the general characteristics of on-unit biological communities including mammals, birds, reptiles, amphibians, and any aquatic communities present. Determine the location, extent, and characteristics of on-unit ecological resources, such as forested areas and wetlands, that could serve as important wildlife habitat or provide other ecological functions. Identify any overt effects of contamination on biological communities. The field investigations included mapping and describing all wetland and terrestrial habitats; recording wildlife observations of birds, mammals, and reptiles; and investigating ecological resources in nearby downgradient and downstream areas which could be affected by mobile contaminants or future remedial actions. In preparation for the field investigation, existing unit information including aerial photographs and reports were reviewed to help identify and describe ecological resources at the waste unit.

  12. Preliminary site characterization - final report

    International Nuclear Information System (INIS)

    Clark, D.; Smith, L.B.

    1993-12-01

    This report summarizes the ecological unit reconnaissance conducted at the F-Area Burning/Rubble Pit(s) RCRA/CERCLA Unit (F-Area BRP) on August 30 and 31, 1993 as part of the RFI/RI baseline risk assessment for the waste unit The baseline risk assessment will assess the potential endangerment to human health and the environment associated with the unit and will be used to evaluate remediation criteria, if needed. The information presented in this report will be used in subsequent stages of the ecological risk assessment to refine the conceptual site model, assist in the selection of contaminants of concern, identify potential ecological receptors, and evaluate trophic relationships and other exposure pathways. The unit reconnaissance survey was conducted in accordance with Specification No. E-18272, Rev. 1 dated August 5, 1993, and the Draft open-quotes Ecological Risk Assessment Program Plan for Evaluation of Waste Sites on the Savannah River Siteclose quotes. The objectives of the site reconnaissance were to: Assess the general characteristics of on-unit biological communities including mammals, birds, reptiles, amphibians, and any aquatic communities present. Determine the location, extent, and characteristics of on-unit ecological resources, such as forested areas and wetlands, that could serve as important wildlife habitat or provide other ecological functions. Identify any overt effects of contamination on biological communities. The field investigations included mapping and describing all wetland and terrestrial habitats; recording wildlife observations of birds, mammals, and reptiles; and investigating ecological resources in nearby downgradient and downstream areas which could be affected by mobile contaminants or future remedial actions. In preparation for the field investigation, existing unit information including aerial photographs and reports were reviewed to help identify and describe ecological resources at the waste unit

  13. 75 FR 45695 - Final Federal Agency Actions on Trans-Texas Corridor 35 (TTC-35) in Texas

    Science.gov (United States)

    2010-08-03

    ...-Texas Corridor 35 (TTC-35) in Texas AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... proposed transportation project, TTC-35, extending from the Texas- Oklahoma line to the City of Laredo, generally paralleling existing I- 35 in the State of Texas. DATES: By this notice, the FHWA is advising the...

  14. Site Study Plan for laboratory soil mechanics, Deaf Smith County site, Texas: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    This Site Study Plan for laboratory soil mechanics describes the laboratory testing to be conducted on soil samples collected as part of the characterization of the Deaf Smith County site, Texas. This study provides for measurements of index, mechanical, thermal, hydrologic, chemical, and mineral properties of soils from boring throughout the site. Samples will be taken from Playa Borings/Trenching, Transportation/Utilities Foundation Borings, Repository Surface Facilities Design Foundation Borings, and Exploratory Shaft Facilities Design Foundation Borings. Data from the laboratory tests will be used for soil strata characterization, design of foundations for surface structures, design of transportation facilities and utility structures, design of impoundments, design of shaft lining, design of the shaft freeze wall, shaft permitting, performance assessment calculations, and other program requirements. A tentative testing schedule and milestone log are given. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 18 refs., 6 figs., 3 tabs

  15. Utilities availability report for seven candidate salt sites: Final draft

    International Nuclear Information System (INIS)

    1984-12-01

    Stearns Catalytic Corporation (SC) conducted a study of availability and accessibility of electric power and natural gas supplies for each of the seven candidate sites in salt for a nuclear waste repository. The objective of this study is to indicate the existing or potential availability of adequate electric power and natural gas supplies, together with representative routing of reasonable access corridors for utility lines, for the candidate sites at Richton and Cypress Creek Domes in Mississippi, Vacherie Dome in Louisiana, Swisher and Deaf Smith Counties in Texas, and Davis and Lavender Canyons in Utah. The report describes the major characteristics of each supply and the representative routes by which each supply could be connected to the assumed respective repository site. Included are a brief narrative, maps showing representative utilities access routes, and a summary tabulation of relevant data. The supply routes used in this study are not necessarily the recommended, preferred, or selected routes. No decision affecting the final location of the preferred route has been made, therefore the routes used in this study are not to be construed as an implied decision. The routes and supply sources used in this study are for comparative purposes only, as no final selections will be made prior to site characterization

  16. Site study plan for borehole search and characterization, Deaf Smith County Site, Texas: Revision 1

    International Nuclear Information System (INIS)

    1987-01-01

    This site study plan describes the Borehole Search and Characterization field activities to be conducted during the early stages of Site Characterization at the Deaf Smith County site, Texas. The field program has been designed to provide data useful in addressing information/data needs resulting from Federal/State/Local regulatory requirements and repository program requirements. Air and ground surveys, an extensive literature search, and landowner interviews will be conducted to locate wells within and adjacent to the proposed nuclear waste repository site in Deaf Smith County. Initially, the study will center around the planned Exploratory Shaft Facilities location and will expand outward from that location. Findings from this study may lead to preparation of a new site study plan to search suspected borehole locations, and excavate or reenter known boreholes for additional characterization or remedial action. The Salt Repository Project (SRP) Networks specify the schedule under which the program will operate. The Technical Field Services Contractor (TFSC) is responsible for conducting the field program. Data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 13 refs., 6 figs., 3 tabs

  17. Site study plan for routine laboratory rock mechanics, Deaf Smith County Site, Texas: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    This Site Study Plan for Routine Laboratory Rock Mechanics describes routine laboratory testing to be conducted on rock samples collected as part of the characterization of the Deaf Smith County site, Texas. This study plan describes the early laboratory testing. Additional testing may be required and the type and scope of testing will be dependent upon the results of the early testing. This study provides for measurements of index, hydrological, mechanical, and chemical properties with tests which are standardized and used widely in geotechnical investigations. Another Site Study Plan for Nonroutine Laboratory Rock Mechanics describes laboratory testing of samples from the site to determine mechanical, thermomechanical, and thermal properties by less widely used methods, many of which have been developed specifically for characterization of the site. Data from laboratory tests will be used for characterization of rock strata, design of shafts and underground facilities, and modeling of repository behavior in support of resolution of both preclosure and postclosure issues. A tentative testing schedule and milestone log are given. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 18 refs., 8 figs., 3 tabs

  18. Estimated transportation routes to a candidate salt repository site in Deaf Smith County, Texas

    International Nuclear Information System (INIS)

    Joy, D.S.; Johnson, P.E.

    1987-10-01

    This report presents a preliminary analysis of possible highway and rail transportation routes within Texas, Oklahoma, and New Mexico for shipments of spent fuel to the candidate repository site in Deaf Smith County, Texas. Two cases are examined for highway shipments. The initial case analyzes shipments following the Department of Transportation's HM-164 regulations for shipment of spent fuel. The second case analyzes normal commercial routes. Three rail cases are also examined. Each case analyzes potential routes that would be used based for different access spurs into the repository site. Two appendices are included which examine additional scenarios generated by restricting routes from passing through various metropolitan areas. The major finding is that most shipments to the Deaf Smith site will pass through Amarillo, Texas. There are few, if any, feasible alternative routes which would significantly reduce the amount of traffic passing through Amarillo

  19. Northeast Oregon Hatchery Project final siting report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  20. Site observational work plan for the UMTRA project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1994-09-01

    During surface remedial action, an estimated 7.0 million tons (6.4 million tonnes) of uranium mill tailings and other contaminated materials were consolidated and stabilized on the Falls City site. The ground water protection strategy at the Falls City disposal site for the UMTRA Surface Project (Subpart A of 40 CFR Part 192 (1994)) was an application for supplemental standards, based on Class III (limited use) ground water in the uppermost aquifer. This water is not a current or potential source of drinking water. Ground water from the uppermost aquifer (ground water from the Deweesville/Conquista Members and the Dilworth Member) contains widespread ambient contamination resulting from naturally occurring conditions and from the effects of human activity not related to uranium milling operations (uranium exploration and mining activities). The ground water cannot be effectively cleaned up for drinking or other beneficial purposes using treatment methods reasonably employed by public water supply systems. The U.S. Nuclear Regulatory Commission (NRC) and the state of Texas concurred with the ground water protection strategy for the disposal site in September 1992. Surface remedial action in accord with Subpart A was completed in April 1994. The proposed ground water compliance strategy (Subpart B of 40 CFR Part 192 (1994)) at the Falls City site is to perform no remedial action based on application for supplemental standards because the ground water in the uppermost aquifer is classified as Class III ground water. Class III ground water includes ground water that is not a current or potential source of drinking water because of widespread, ambient contamination that cannot be cleaned up using treatment methods reasonably employed by public water supply systems (40 CFR section 192.11 (e) (1994)). Although supplemental standards are being applied, the potential use of ground water in the site vicinity will be protected

  1. Umatilla Satellite and Release Sites Project : Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  2. Project Rio Blanco: site restoration. Final report

    International Nuclear Information System (INIS)

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  3. Site study plan for exploratory shaft monitoring wells, Deaf Smith County Site, Texas: Preliminary Draft

    International Nuclear Information System (INIS)

    1988-01-01

    As part of site characterization studies, two exploratory shafts will be constructed at the Deaf Smith County site, Texas. Twelve wells at five locations have been proposed to monitor potential impacts of shaft construction on water-bearing zones in the Ogallala Formation and the Dockum Group. In addition, tests have been proposed to determine the hydraulic properties of the water-bearing zones for use in design and construction of the shafts. Samples of the Blackwater Draw Formation, Ogallala Formation, and Dockum Group will be obtained during construction of these wells. Visual indentification, laboratory testing, and in situ testing will yield data necessary for Exploratory Shaft Facility design and construction. This activity provides the earliest data on the Blackwater Drew Formation, Ogallala Formation, and Dockum Group near the exploratory shaft locations. Drilling and hydrologic testing are scheduled prior to other subsurface activity at the Exploratory Shaft Facility to establish ground-water baseline conditions. The Technical Field Services Contractor is responsible for conducting the field program of drilling and testing. Samples and data will be handled and reported in accordance with established Salt Repository Project procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that the appropriate documentation is maintained. 45 refs., 11 figs., 4 tabs

  4. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas

    International Nuclear Information System (INIS)

    Chernoff, A.R.; Lacker, D.K.

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas

  5. Northeast Oregon Hatchery Project, Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  6. Site study plan for intermediate hydrology clusters tests wells Deaf Smith County Site, Texas

    International Nuclear Information System (INIS)

    1988-01-01

    To characterize the geologic, geochemical, and hydrologic characteristics of intermediate-depth formations at the proposed Deaf Smith County, Texas, repository site, wells called Intermediate Hydrology clusters will test the Dewey Lake, Alibates, Salado, Yates, Upper and Lower Seven Rivers, and Queen Grayburg Formations. Sixteen wells will be installed at six locations. One location will have four wills, two locations will have three wells, and three locations will have two wells for a total of 16 wells. Testing of the formations is to proceed from the bottom up, with 2-day pumping tests at the less permeable formations. Tracer tests and tests for verticall hydraulic properties will be designed and performed after other hydrologic tests are completed. After testing, selected wells are to be completed as single or possibly dual monitoring wells to observe water-level trends. To develop a hydrogeologic testing plan, the response of each formation to potential testing procedures was evaluated using design values and an assumend range for hydraulic parameters. These evaluations indicate that hydraulic properties of a sandy zone of the Dockum, the lower Sever Rivers, and possibly the Alibates and Queen/Grayburg can be determined by pumping tests. Standard of shut-in slug tests must be conducted in the remaining formations. Tests of very long duration would be required to determine the verticla properties of less permeable formations. Tracer tests would also require weeks or months. 61 figs., 34 refs., 4 tabs

  7. Final vegetative cover for closed waste sites

    International Nuclear Information System (INIS)

    Cook, J.R.; Salvo, S.K.

    1993-01-01

    Low-level, hazardous, and mixed waste disposal sites normally require some form of plant material to prevent erosion of the final closure cap. Waste disposal sites are closed and capped in a complex scientific manner to minimize water infiltration and percolation into and through the waste material. Turf type grasses are currently being used as an interim vegetative cover for most sites. This coverage allows for required monitoring of the closure cap for settlement and maintenance activities. The purpose of this five year study was to evaluate plant materials for use on wastes sites after the post-closure care period that are quickly and easily established and economically maintained, retard water infiltration, provide maximum year-round evapotranspiration, are ecologically acceptable and do not harm the closure cap. The results of the study suggest that two species of bamboo (Phyllostachys (P.) bissetii and P. rubromarginata) can be utilized to provide long lived, low maintenance, climax vegetation for the waste sites after surveillance and maintenance requirements have ceased

  8. Texas A&M University in the JET Collaboration - Final Report

    International Nuclear Information System (INIS)

    Fries, Rainer; Ko, Che-Ming

    2016-01-01

    This final report summarizes the work done by PIs at Texas A&M University within the JET Topical Collaboration. The main focus of the group at Texas A&M has been the development and implementation of a hadronization model suitable to calculate hadronization of jet showers in heavy ion collisions event by event. The group successfully developed a hybrid model of parton recombination and remnant string fragmentation including recombination with thermal partons. A code realizing this model was developed and shared with other JET members. In addition, the group at Texas A&M worked on both open and hidden heavy flavor probes. In particular, they developed a description of heavy flavor hadronization based on recombination, and consistent with in-medium scattering rates of heavy quarks, and suggested the D s meson as a precise probe of the hadronization mechanism. Another noteworthy focus of their work was electromagnetic probes, in particular, dileptons and photons from interactions of jets with the medium. In the soft sector the group has made several contributions to modern topics, e.g. the splitting of elliptic flow between isospin partners and the role of the initial strong gluon fields.

  9. Texas A&M University in the JET Collaboration - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Fries, Rainer [Texas A & M Univ., College Station, TX (United States); Ko, Che-Ming [Texas A & M Univ., College Station, TX (United States)

    2016-05-02

    This final report summarizes the work done by PIs at Texas A&M University within the JET Topical Collaboration. The main focus of the group at Texas A&M has been the development and implementation of a hadronization model suitable to calculate hadronization of jet showers in heavy ion collisions event by event. The group successfully developed a hybrid model of parton recombination and remnant string fragmentation including recombination with thermal partons. A code realizing this model was developed and shared with other JET members. In addition, the group at Texas A&M worked on both open and hidden heavy flavor probes. In particular, they developed a description of heavy flavor hadronization based on recombination, and consistent with in-medium scattering rates of heavy quarks, and suggested the Ds meson as a precise probe of the hadronization mechanism. Another noteworthy focus of their work was electromagnetic probes, in particular, dileptons and photons from interactions of jets with the medium. In the soft sector the group has made several contributions to modern topics, e.g. the splitting of elliptic flow between isospin partners and the role of the initial strong gluon fields.

  10. Consultation draft: Site characterization plan overview, Deaf Smith County Site, Texas: Nuclear Waste Policy Act (Section 113)

    International Nuclear Information System (INIS)

    1988-01-01

    The Department of Energy (DOE) is preparing a site characterization plan for the candidate site in Deaf Smith County, Texas. The DOE has provided, for information and review, a consultation draft of the plan to the State of Texas and the US Nuclear Regulatory Commission. The site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site characterization plan; it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the repository system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Deaf Smith County site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 15 figs., 1 tab

  11. Lineaments of Texas - possible surface expressions of deep-seated phenomena. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Woodruff, C.M. Jr.; Caran, S.C.

    1984-04-01

    Lineaments were identified on 51 Landsat images covering Texas and parts of adjacent states in Mexico and the United States. A method of identifying lineaments was designed so that the findings would be consistent, uncomplicated, objective, and reproducible. Lineaments denoted on the Landsat images were traced onto 1:250,000-scale work maps and then rendered cartographically on maps representing each of the 51 Landsat images at a scale of 1:500,000. At this stage more than 31,000 lineaments were identified. It included significant areas outside of Texas. In preparing the final lineament map of Texas at 1:1,000,000-scale from the 1:500,000-scale maps, all features that lay outside Texas and repetition among features perceived by individual workers were eliminated. Cultural features were checked for before reducing and cartographically fitting the mosaic of 51 individual map sheets to a single map base. Lineaments that were partly colinear but with different end points were modified into a single lineament trace with the combined length of the two or more colinear lineaments. Each lineament was checked to determine its validity according to our definition. The features were edited again to eliminate processing artifacts within the image itself, as well as representations of cultural features (fencelines, roads, and the like) and geomorphic patterns unrelated to bedrock structure. Thus the more than 31,000 lineaments originally perceived were reduced to the approximately 15,000 presented on the 1:1,000,000 map. Interpretations of the lineaments are presented.

  12. Site-Based Budgeting in Fort Worth, Texas.

    Science.gov (United States)

    Peternick, Lauri; Sherman, Joel

    1998-01-01

    Examines the Fort Worth Independent School District's decentralized decision-making system through three lenses: a review of site-based decision-making procedures at several schools; an examination of who participates; and stakeholders' perceptions. Some schools operated democratically, significantly including teachers, parents, and community…

  13. Site-specific design of the super collider in Texas

    International Nuclear Information System (INIS)

    Laughton, C.; Nelson, P.P.; Lundin, T.K.

    1990-06-01

    This paper will outline the scope of the Superconducting Super Collider (SSC), underground works and present the current accelerator layout. After a brief overview of the site geotechnical characteristics, emphasis will be placed upon the possibilities for the incorporation of mechanical excavation technology into the construction of the various underground structures. 5 figs

  14. Noise source emissions, Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    1987-01-01

    Noise source data and use factors for modeling the noise environment expected from salt site repository activity were provided by Battelle Columbus Division. This report has been prepared for the purpose of documenting the development of the data provided to the Repository Project Management (RPM) organization. The data provided encompass all phases of activity from site preparation through construction of the exploratory shaft facility (ESF). Noise environments expected from construction and operation of transportation corridors associated with the activity were also modeled. The equipment inventory, including sound-power levels for each item, is included. Emission source terms provided by Parsons Brinckerhoff/PB-KBB for the ESF were used as a basis for the noise-source emission inventory development. Where available, research results containing complete spectra were used. In cases where complete data were not available, a sound-pressure spectrum was synthesized from a characteristic spectrum shape from a similar piece of equipment. For example, a front-shovel excavator might be approximated by data from a front-end loader of similar horsepower range. Sound-power-level spectra were then calculated from the sound-pressure-level data. 2 refs

  15. Site Study Plan for salt, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Salt Site Study Plan (SSP) describes a program for characterizing the existing salt environment in the site vicinity. A step-by-step approach is described which proceeds from published data and planned theoretical studies, to planned laboratory studies, and finally to planned field studies, to provide the necessary data to meet program requirements contained in the Salt Repository Project - Requirements Document (SRP-RD). The plan also draws on the results of other SSP's for certain data; for example, soil salinity data are to be provided under the Soils SSP. The salt studies consist of evaluation of control and mitigation measures, salt monitoring studies, emission factors development, air models development and validation, and risk assessment. For each study, its design and design rationale; analysis, management, and use of data; schedule of activities; organization of personnel and sample management; and quality assurance requirements are described. 90 refs., 9 figs., 7 tabs

  16. Hydrogeologic testing plan for Deep Hydronest Test Wells, Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    1987-12-01

    This report discusses methods of hydraulic testing which are recommended for use in the Deep Hydronest Test Wells at the proposed high level nuclear waste repository site in Deaf Smith County, Texas. The deep hydronest wells are intended to provide geologic, geophysical and hydrologic information on the interval from the Upper San Andres Formation to the base of the Pennsylvanian system at the site. Following the period of drilling and testing, the wells will be converted into permanent monitoring installations through which fluid pressures and water quality can be monitored at various depths in the section. 19 refs., 17 figs., 2 tabs

  17. Site study plan for Playa investigations, Deaf Smith County, Texas: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    This plan defines the purpose and objectives of the Playa Investigation Study, presents a plan of work to provide the information necessary to resolve issues, and discusses the rationale for test method selection. The required information will be obtained from existing well drilling records, describing and testing of soil and rock samples recovered from project test holes, geophysical well logs, seismic surveys, and shallow test pits excavated at ground surface. There have been numerous, often conflicting, theories presented to explain the origin(s) of the playas of the Texas High Plains. The primary purpose of this study is to establish if existing playas and playa alignments are related to deeper subsurface structure, such as faulting or salt dissolution, the potential for future playa development, and the significance of existing and/or future playas on siting a repository in Deaf Smith County, Texas. 11 refs

  18. Cultural resources survey and assessment of the proposed Department of Energy Freeport to Texas City pipeline, Brazoria and Galveston Counties, Texas. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Castille, G.J.; Whelan, J.P. Jr.

    1986-01-01

    An intensive survey and testing program of selected segments of a proposed Department of Energy pipeline were conducted by Coastal Environments, Inc., Baton Rouge, Louisiana, during December 1985 and January 1986. The proposed pipeline runs from Texas City, Galveston County to Bryan Mound, Brazoria County. The pedestrian survey was preceded by historical records survey to locate possible historic sites within the DOE righ-of-way. Four prehistoric sites within the ROW (41BO159, 160, 161, 162) and one outside the ROW (41BO163) were located. All are Rangia cuneata middens. The survey results are discussed with particular reference to the environmental settings of the sites and the effectiveness of the survey procedure. Two of the sites located within the ROW were subjected to additional testing. The results of the backhoe testing program are included in the site descriptions, and the scientific value of the sites are presented. 52 refs., 20 figs., 10 tabs.

  19. Technical procedures for implementation of aesthetics site studies, Deaf Smith County site, Texas: Environmental Field Program

    International Nuclear Information System (INIS)

    1987-06-01

    This chapter introduces the purpose and scope of the visually affected areas determination, as well as definitions, interfaces, and concurrent data needs. This procedure provides a method for determining the extent of visibility of the project. This area is identified as the visually affected area, and becomes the area within which all visual analysis is conducted. The visually affected area analysis of the Deaf Smith County site will involve identifying and mapping the visibility of all major proposed project features. Baseline analysis will be conducted within the overall visually affected area; impact assessment will be conducted within the visually affected area of each major project feature. This procedure presents the guidelines for determining the visually affected area will be in computer data base construction; viewshed modeling, and site visit and verification of results. Computer data base construction will involve digitizing topographic and project facility data from available data source. The extent of the visible area from each major project feature will then be plotted. Finally, these computer-generated visibility plots will be verified in the field

  20. Technical procedures for implementation of acoustics site studies, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-09-01

    The purpose and scope of the technical procedure for processing data from the tethered meteorological system are covered. Definitions, interfaces, and concurrent data needs are also addressed. This technical procedure describes how to control, organize, verify, and archive tethered meteorological system data. These data will be received at the processing location from the field measurement location and are part of the characterization of the Deaf Smith County Site, Texas for the salt repository program. These measurements will be made in support of the sound propagation study and are a result of environmental data requirements for acoustics. 6 refs., 15 figs., 5 tabs

  1. Strategic petroleum reserve, Byran Mound Salt Dome, Brazoria County, Texas. Final environmental impact statement (final supplement to FEA FES 76/77-6)

    Energy Technology Data Exchange (ETDEWEB)

    1977-12-01

    On January 7, 1977, the Federal Energy Administration issued a Final Environmental Impact Statement (EIS) for the development of the Bryan Mound salt dome as a storage site for the Strategic Petroleum Reserve (FES 76/77-6). On October 1, 1977, the U.S. Department of Energy was created and the programs of the Federal Energy Administration were transferred to the new Department. As such, this final supplement is being issued by the Department of Energy. The salt dome is located in Brazoria County, Texas. Since the EIS was published, it has been determined that this arrangement would be inadequate to meet the long term requirements for filling and withdrawing oil at the site, although the disposal of brine to Dow Chemical would be utilized to the maximum extent possible. Therefore, on July 15, 1977, a Draft Supplement to FES 76/77-6 was issued addressing the environmental impacts of construction and operation of two types of brine disposal systems and a new water supply system. This final supplement addresses a brine injection well system and a water intake system. Construction of this new system component would cause temporary disruption to land use, water quality, air quality, and terrestrial and aquatic ecology. The new facilities would permanently change 17 acres of land from its present use. Operation of the systems would have relatively small, short-term impacts. Use of the brine surge pit could adversely affect air quality by emitting hydrocarbon vapors (maximum rate of 51.4 tons per year). Operation of the disposal wells would increase the salinity of an already saline aquifer. All operational impacts would be relatively minor and short-term, occurring only during periods of fill or withdrawal of the storage facility.

  2. Beach Geomorphology and Kemp's Ridley (Lepidochelys kempii) Nest Site Selection along Padre Island, Texas, USA

    Science.gov (United States)

    Culver, M.; Gibeaut, J. C.; Shaver, D. J.; Tissot, P.; Starek, M. J.

    2017-12-01

    The Kemp's ridley sea turtle (Lepidochelys kempii) is the most endangered sea turtle in the world, largely due to the limited geographic range of its nesting habitat. In the U.S., the majority of nesting occurs along Padre Island National Seashore (PAIS) in Texas. There has been limited research regarding the connection between beach geomorphology and Kemp's ridley nesting patterns, but studies concerning other sea turtle species suggest that certain beach geomorphology variables, such as beach slope and width, influence nest site selection. This research investigates terrestrial habitat variability of the Kemp's ridley sea turtle and quantifies the connection between beach geomorphology and Kemp's ridley nest site selection on PAIS and South Padre Island, Texas. Airborne topographic lidar data collected annually along the Texas coast from 2009 through 2012 was utilized to extract beach geomorphology characteristics, such as beach slope and width, dune height, and surface roughness, among others. The coordinates of observed Kemp's ridley nests from corresponding years were integrated with the aforementioned data in statistical models, which analyzed the influence of both general trends in geomorphology and individual morphologic variables on nest site selection. This research identified the terrestrial habitat variability of the Kemp's ridley and quantified the range of geomorphic characteristics of nesting beaches. Initial results indicate that dune width, beach width, and wind speed are significant variables in relation to nest presence, using an alpha of 0.1. Higher wind speeds and narrower beaches and foredunes favor nest presence. The average nest elevation is 1.13 m above mean sea level, which corresponds to the area directly below the potential vegetation line, and the majority of nesting occurs between the elevations of 0.68 m and 1.4 m above mean sea level. The results of this study include new information regarding Kemp's ridley beach habitat and its

  3. Migration and habitat preferences of Swainson's Hawks at an autumn stopover site in northwestern Texas

    Science.gov (United States)

    Littlefield, Carroll D.; Johnson, Douglas H.

    2013-01-01

    Unlike most raptors, the Swainson's Hawk (Buteo swainsoni) migrates long distances between breeding and wintering ranges, which elevates the importance of stopover sites for foraging. We conducted three years of fall surveys in the Southern High Plains of Texas. Migrant Swainson's Hawks moved through the area mostly between July and mid-October, peaking in September. Subadults tended to migrate earlier than adults, and light morphs before dark morphs. Favored foraging habitats included silage corn, green beans, and alfalfa, but the hawks foraged primarily where ongoing agricultural activities disturbed prey and made them more available.

  4. Mock Site Licensing Demonstration Project. Final report

    International Nuclear Information System (INIS)

    Roop, R.D.

    1986-06-01

    The Mock Site Licensing Demonstration Project developed the Low-Level Radioactive Waste Siting Simulation, a role-playing exercise designed to facilitate the process of siting and licensing disposal facilities for low-level waste (LLW). This report describes the development, contant, and usefulness of the siting simulation. The simulation was designed by Harvard University's Program on Negotiation; it can be conducted at a workshop or conference, involves 14 or more participants, and requires about eight hours to complete. The simulation consists of two sessions. In the first, participants negotiate the selection of siting criteria, and in the second, a preferred site for a facility is chosen from three candidate sites. The project sponsored two workshops (in Boston, Massachusetts and Richmond, Virginia) in which the simulation was conducted for persons involved in planning for LLW. It is concluded that the siting simulation can be useful in three ways: (1) as a tool for information dissemination, (2) as a vehicle that can foste communication among parties in conflict, and (3) as a step toward consensus building and conflict resolution. The DOE National Low-Level Waste Management Program is now making the siting simulation available for use by states, regional compacts, and other organizations involved in development of LLW disposal facilities

  5. Data Validation Package: April 2016 Groundwater Sampling at the Falls City, Texas, Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    Jasso, Tashina [USDOE Office of Legacy Management, Washington, DC (United States); Widdop, Michael [Navarro Research and Engineering, Inc., Las Vegas, NV (United States)

    2016-09-29

    Nine groundwater samples were collected at the Falls City, Texas, Disposal Site as specified in the March 2008 Long-Term Surveillance Plan for the US Department of Energy Falls City Uranium Mill Tailings Disposal Site, Falls City, Texas (DOE-LM/1602-2008). Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). The wells sampled included the cell performance monitoring wells (0709, 0858, 0880, 0906, and 0921) and the groundwater monitoring wells (0862, 0886, 0891, 0924, and 0963). A duplicate sample was collected from location 0891. Water levels were measured at each sampled well. Historically, cell performance monitoring wells 0908 and 0916 have not produced water and were confirmed as dry during this sampling event. These wells are completed above the saturated interval in the formation. Notable observations for time-concentration graphs in this report include: (1) uranium concentrations in well 0891 continue to increase; (2) the uranium concentration in well 0880 is higher than the 2015 value and lower than the 2014 value, and it remains within the range of historical values; and (3) uranium concentrations in the other sampled wells are below 2 mg/L and consistent with previous results.

  6. Environmental regulatory compliance plan, Deaf County site, Texas: Draft revision 1

    International Nuclear Information System (INIS)

    1987-01-01

    The DOE is committed to conduct its operation in an environmentally safe and sound manner and comply with the letter and spirit of applicable environmental statues and regulations. These objectives are codified in DOE order N 5400.2, ''Environmental Policy Statement.'' This document, the Deaf Smith County site (Texas) Environmental Regulatory Compliance Plam (ERCP), is one means of implementing that policy. The ERCP describes the environmental regulatory requirements applicable to the Deaf Smith County site (Texas), and presented the framework within which the Salt Repository Project Office (SRPO) will comply with the requirements. The plan also discusses how DOE will address State and local environmental requirements. To achieve this purpose the ERCP will be developed in phases. This version of the ERCP is the first phase in the delopment of the ERCP. It represents the Salt Repository Project Office's understanding of environmental requirements for the site characterization phase of repository development. After consultation with the appropriate federal and state agencies and affected Indian tribes, the ERCP will be updated to reflect the results of consultation with these agencies and affected Indian tribes. 6 refs., 38 figs

  7. Long-term surveillance plan for the Falls City Disposal Site, Falls City, Texas

    International Nuclear Information System (INIS)

    1995-06-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project Falls City disposal site, Falls City, Texas, describes the surveillance activities for the disposal site. DOE will carry out these activities to ensure that the disposal cell continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials. This LTSP documents whether the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a)

  8. Long-term Surveillance Plan for the Falls City Disposal Site, Falls City, Texas. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project Falls City disposal site, Falls City, Texas, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials. This LTSP documents whether the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a)

  9. Site 300 Bat Monitoring Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Drennan, Joe [Garcia and Associates, San Francisco, CA (United States); Tortosa, Justin [Garcia and Associates, San Francisco, CA (United States)

    2016-07-18

    From June 15 to 18, 2015, GANDA biologist Graham Neale assisted in programming and fieldtesting of the bat monitoring equipment. The equipment was deployed in the field on a meteorological (MET) tower within Site 300 on June 18, 2015.

  10. Hanford Site pollution prevention progress report; FINAL

    International Nuclear Information System (INIS)

    BETSCH, M.D.

    1999-01-01

    The Richland Operations Office (RL) and Office of River Protection (ORP) are pleased to issue the attached Pollution Prevention Progress Report. We have just met the most aggressive waste reduction and A recycling goals to date and are publishing this report to recognize A the site's progress, and to ensure it will sustain success beyond 1 Fiscal Year 2000. This report was designed to inform the been made by RL and ORP in Waste Minimization (WMin) and Pollution Prevention (P2). RL, ORP and their contractors are committed to protecting the environment, and we reiterate pollution prevention should continue to be at the forefront of the environmental cleanup and research efforts. As you read the attached report, we believe you will see a clear demonstration of RL and ORP's outstanding performance as it has been responsible and accountable to the nation, its employees, and the community in which we live and work. commitment that all employees have for environmental stewardship. The report provides useful information about the U.S. Department of Energy's (DOE'S) environmental policy and programs, and contains countless examples of waste minimization projects. This year was the first year our site received the White House Closing the Circle in the category of Affirmative Procurement. This Award recognizes our site for designing a comprehensive strategy for achieving 100 percent purchases of the U.S.Environmenta1 Protection Agency designated recycled items. DOE-Headquarters also acknowledged the site in 1999 for its public outreach efforts in communicating pollution prevention to Hanford Site employees and the community. Our site is truly a recognized leader in outreach as it has kept this title for two consecutive years. In previous years, we received the White House Closing the Circle Honorable Mention in Affirmative Procurement and several other National DOE Awards. Through partnership with the local community and stakeholders, the site and its contractors have a clear

  11. Implementation and effectiveness of sound mitigation measures on Texas highways (HB 790) : final report.

    Science.gov (United States)

    2016-10-01

    The 84th Texas Legislature passed House Bill (HB) 790 directing the Texas A&M Transportation Institute (TTI) to perform a study on the implementation and effectiveness of sound mitigation measures on the state highway system and certain toll roads an...

  12. Site characterization and validation - Final report

    International Nuclear Information System (INIS)

    Olsson, O.

    1992-04-01

    The central aims of the Site Characterization and Validation (SCV) project were to develop and apply; * an advanced site characterization methodology and * a methodology to validate the models used to describe groundwater flow and transport in fractured rock. The basic experiment within the SCV project was to predict the distribution of water flow and tracer transport through a volume of rock, before and after excavation of a sub-horizontal drift, and to compare these predictions with actual field measurements. A structured approach was developed to combine site characterization data into a geological and hydrogeological conceptual model of a site. The conceptual model was based on a binary description where the rock mass was divided into 'fracture zones' and 'averagely fractured rock'. This designation into categories was based on a Fracture Zone Index (FZI) derived from principal component analysis of single borehole data. The FZI was used to identify the location of fracture zones in the boreholes and the extent of the zones between the boreholes was obtained form remote sensing data (radar and seismics). The consistency of the geometric model thus defined, and its significance to the flow system, was verified by cross-hole hydraulic testing. The conceptual model of the SCV site contained three major and four minor fractures zones which were the principal hydraulic conduits at the site. The location and extent of the fracture zones were included explicitly in the flow and transport models. Four different numerical modelling approaches were pursued within the project; one porous medium approach, two discrete fracture approaches, and an equivalent discontinuum approach. A series of tracer tests was also included in the prediction-validation exercise. (120 refs.) (au)

  13. Health assessment for Tex Tin Corporation, National Priorities List Site, Texas City, Texas, Region 6. CERCLIS No. TXD062113329. Preliminary report

    International Nuclear Information System (INIS)

    1990-01-01

    The Tex Tin Corporation facility, formerly Gulf Chemical and Metallurgical Corporation, is a proposed National Priorities List site located in Texas City, Galveston County, Texas. Tex Tin previously operated as a primary tin smelter, but currently operates as a copper smelter. Significant concentrations of metals (antimony, arsenic, barium, cadmium, chromium, copper, lead, manganese, mercury, nickel, silver, tin, and zinc) have been detected on-site in surface water, groundwater, and soil. Significant concentrations of metals (arsenic, cadmium, chromium, lead, nickel, and tin) have also been detected in ambient air samples collected off-site. Some remediation activities have occurred on-site including the closure of a 19-million-gallon ferric chloride pond and the removal of approximately 4,000 drums containing radioactive material. The Tex Tin site poses a potential public health concern for on-site workers, residents living in nearby neighborhoods, and possibly for a limited number of residents on private wells located within approximately one mile of the site

  14. Addressing concerns about the agricultural impacts of siting a nuclear waste repository in Texas

    International Nuclear Information System (INIS)

    Boryczka, M.; Darrough, B.

    1986-01-01

    Public concerns related to the siting of a nuclear repository have included the potential impacts to specific economic sectors. In Texas, local residents have expressed concern about how a repository will affect agriculture. Several major questions have arisen with respect to this issue including: 1) how will a repository's requirements for land and water affect agriculture, 2) how will a repository affect agricultural land values, and 3) how will actual or perceived contamination of locally grown products affect their marketability? This paper describes the concerns raised by local residents and discusses the approach to analyzing the concerns identified. An evaluation of agricultural impacts has been prepared for the Department of Energy's Enviromental Assessment (EA) documents. In addition, activities needed to further evaluate these impacts are planned for site characterization. Both the current analysis and planned activities are described

  15. Shaft siting decision report: Final report

    International Nuclear Information System (INIS)

    1985-11-01

    The purpose of this study is to identify and establish relative guidelines to be used for siting of repository shafts. Weights were determined for the significant factors which impact the selection of shaft locations for a nuclear waste repository in salt. The study identified a total of 45 factors. A panel of experienced mining people utilized the Kepner-Tregoe (K-T) Decision Analysis Process to perform a structured evaluation of each significant shaft siting factor. The evaluation determined that 22 of the factors were absolute constraints and that the other 23 factors were desirable characteristics. The group established the relative weights for each of the 23 desirable characteristics by using a paired comparison method. 49 refs., 2 figs., 5 tabs

  16. Site observational work plan for the UMTRA Project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy

  17. Technical procedures for the implementation of cultural resource site studies, Deaf Smith County, Texas: Preliminary draft

    International Nuclear Information System (INIS)

    1987-01-01

    Cultural resources at the Deaf Smith County site will be identified, evaluated and managed through the implementation of studies detailed in the Site Study Plan for Cultural Resources. This technical procedure outlines the conduct of pedestrian survey and the documentation of identified cultural resources. The purpose of the field surveys is to identify and document cultural resources in the areas that will be affected by site characterization activities and to record the environmental setting of identified cultural resources. Three pedestrian surveys will cover 100 percent of the on-site and off-site project areas. Survey 1 will provide coverage of the Repository Surface Facility (RSF) area, which includes the Exploratory Shaft Facility (ESF) and two linear engineering design borehole (EDBH) seismic survey corridors. Survey 2 will provide coverage of a 39 km 2 (15 mi 2 ) area that includes the 23 km 2 (9 mi 2 ) Deaf Smith County site plus a 0.4 to 0.8 kM (1/4 to 1/2 mi) border area but excludes the area covered by Survey 1. Survey 3 will cover offsite geotechnical test areas, such as the locations of playa boreholes, deep playa wells, hydrologic tests, site foundation borings, and their access routes. The purpose of site documentation or recording is to address the project information needs for land use permits and approvals, engineering design support, and cultural resource evaluation for National Register of Historic Places eligibility. Site documentation will consist of gathering sufficient data on identified resources to complete Texas Natural Resource Information System (TNRIS). 7 refs., 3 figs

  18. Grimsel Test Site: heat test, final report

    International Nuclear Information System (INIS)

    Schneefuss, J.; Glaess, F.; Gommlich, G.; Schmidt, M.

    1989-05-01

    The Swiss concept for the storage of radioactive waste consists in placing it in compact, dense rock formations. An experiment 'Heat Test' carried out by the 'Gesellschaft fuer Strahlen- und Umweltforschung' in Nagra's Grimsel rock laboratory simulated the heat production of stored radioactive waste. The aim was to evaluate processes for the demonstration of the suitability of a final repository for heat-producing radioactive waste in cristalline rock, to investigate the thermic, mechanic and hydraulic reactions to an artificial heat source, and to develop corresponding calculating models. The duration of the tests was about 3 years. In this report the measured thermic, mechanic and hydraulic reactions are documented and discussed in detail. A simple, rotation symmetrical FEM-model was used for the preparatory and experiment-accompanying modelling of the thermomechanical conditions in the heat test. The test showed that suitable measuring methods for the surveillance of the geomechanics of a final repository are available and that the reactions of the crystalline host rock to the heat source remain locally limited and can be modelled with relatively small effort. 29 refs., 33 figs., 10 tabs

  19. Site study plan for utilities and solid waste, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    This site plan describes utilities and solid waste studies to be conducted during the characterization of the Deaf Smith County, Texas, site for the US Department of Energy's Salt Repository Project. After utilities and solid waste information needs derived from Federal, State, and local statutes and regulations and the project specifications are briefly described, the site study plan describes the study design and rationale, the field data collection procedures and equipment, and data analysis methods and application of results, the data management strategy, the schedule of field activities, the management of the study, and the study's quality assurance program. The field data collection activities are organized into programs to characterize electrical power, natural gas, communication, water, wastewater sludge, nonradiological solid waste, nonradiological hazardous waste, and low-level radiological waste. These programs include details for the collection of project needs, identification of utilities and solid waste disposal contractor capabilities, and verification of the obtained data. Utilities and solid waste field activities will begin approximately at the time of site access. Utilities and solid waste characterization will be completed within the first year of activity. 29 refs., 6 figs., 2 tabs

  20. Site study plan for cultural resources, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Cultural Resources Site Study Plan describes a field program to identify and evaluate the archaeological, historical, and Native American Indian resources of the site on local and regional perspectives; monitor and manage discovered cultural resources; and establish a worker education program. The archaeological field program consists of three pedestrian surveys: Survey 1 includes two EDBH seismic survey lines and the area within the exploratory shaft facility (ESF); Survey 2 includes the remainder of the site plus a 1/4 to 3/4-mi border area; and Survey 3 includes an assortment of offsite areas. The historical studies will identify and evaluate known and discovered historical sites and structures and the Native American Indian will identify and evaluate cultural and religious concerns expressed by Indian tribal groups. Prehistoric and historic sites will be evaluated to determine if they meet eligibility criteria for listing on the National Register of Historic Places. This site study plan describes the need for each study; its design and design rationale; analysis, management, and use of data; schedule of field activities; organization of field personnel and sample management; and quality assurance requirements. The cultural resource studies will provide data for satisfying the Programmatic Agreement, engineering design needs, and SRP requirements for permits and approvals, and for minimizing effects to any cultural properties discovered during site characterization. 75 refs., 10 figs., 2 tabs

  1. Role of the Texas transportation system in attracting and retaining business : final report.

    Science.gov (United States)

    2017-05-01

    Texas should remain vigilant and aggressive as it strategizes about how to use transportation as a means to stimulate economic growth. This can be done by designing the transportation network to prioritize connectivity to, from, and between hubs of e...

  2. Summary of repository siting models. Final report

    International Nuclear Information System (INIS)

    Thomas, S.D.; Ross, B.; Mercer, J.W.

    1982-07-01

    This report is the first in a series of reports that will provide critical reviews and summaries of computer programs that can be used to analyze the potential performance of a high-level radioactive waste repository. The computer programs identified address the following phenomena: saturated and unsaturated subsurface flow, heat transport, solute transport, surface water runoff, geomechanical interactions, and geochemical interactions. The report identifies 183 computer programs that can be used to analyze a repository site and provides a summary description of 31 computer programs. The summary descriptions can be used: to assist in code evaluation, to facilitate code comparison, to determine applicability of codes to specific problems, to identify code deficiencies, and to provide a screening mechanism for code selection

  3. Long-term surveillance plan for the Falls City Disposal Site, Falls City, Texas. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The need for ground water monitoring at the Falls City disposal site was evaluated in accordance with NRC regulations and guidelines established by the DOE in Guidance for Implementing the Long-term Surveillance Program for UMTRA Project Title 1 Disposal Sites (DOE, 1996). Based on evaluation of site characterization data, it has been determined that a program to monitor ground water for demonstration of disposal cell performance based on a set of concentration limits is not appropriate because ground water in the uppermost aquifer is of limited use, and a narrative supplemental standard has been applied to the site that does not include numerical concentration limits or a point of compliance. The limited use designation is based on the fact that ground water in the uppermost aquifer is not currently or potentially a source of drinking water in the area because it contains widespread ambient contamination that cannot be cleaned up using methods reasonably employed by public water supply systems. Background ground water quality varies by orders of magnitude since the aquifer is in an area of redistribution of uranium mineralization derived from ore bodies. The DOE plans to perform post-closure ground water monitoring in the uppermost aquifer as a best management practice (BMP) as requested by the state of Texas.

  4. Long-term surveillance plan for the Falls City Disposal Site, Falls City, Texas. Revision 2

    International Nuclear Information System (INIS)

    1996-11-01

    The need for ground water monitoring at the Falls City disposal site was evaluated in accordance with NRC regulations and guidelines established by the DOE in Guidance for Implementing the Long-term Surveillance Program for UMTRA Project Title 1 Disposal Sites (DOE, 1996). Based on evaluation of site characterization data, it has been determined that a program to monitor ground water for demonstration of disposal cell performance based on a set of concentration limits is not appropriate because ground water in the uppermost aquifer is of limited use, and a narrative supplemental standard has been applied to the site that does not include numerical concentration limits or a point of compliance. The limited use designation is based on the fact that ground water in the uppermost aquifer is not currently or potentially a source of drinking water in the area because it contains widespread ambient contamination that cannot be cleaned up using methods reasonably employed by public water supply systems. Background ground water quality varies by orders of magnitude since the aquifer is in an area of redistribution of uranium mineralization derived from ore bodies. The DOE plans to perform post-closure ground water monitoring in the uppermost aquifer as a best management practice (BMP) as requested by the state of Texas

  5. Den site activity patterns of adult male and female swift foxes, Vulpes velox, in Northwestern Texas

    Science.gov (United States)

    Lemons, P.R.; Ballard, W.B.; Sullivan, R.M.; Sovada, M.A.

    2003-01-01

    Activity of Swift Foxes (Vulpes velox) at den sites was studied in northwestern Texas during pup rearing seasons in 2000 and 2001 to determine role of males in parental care. Twenty-four percent of radio-collared females with a potential to breed successfully raised pups to eight weeks of age. We intensively monitored presence and absence of male and female Swift Foxes at two den sites each year. Females were present >2.6 times more at den sites than males during the pup rearing season. Female and male Swift Foxes largely stayed at dens during diurnal hours and were active away from dens during nocturnal and crepuscular hours. Females and males spent 12.4% and 3.0% more time at dens before pups emerged, than after pups emerged, respectively. Following depredation of one male parent, the female spent 29% less time at the den site. Decrease in time spent at the den by the female following loss of her mate suggested that loss of one parent might severely impact recruitment of Swift Foxes. Our observations indicated that intense Coyote (Canis latrans) depredation may severely impact pup-rearing success as well as the parental care within Swift Fox family groups.

  6. Site study plan for non-routine laboratory rock mechanics, Deaf Smith County Site, Texas: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    This Site Study Plan describes the non-routine rock mechanics and thermal properties laboratory testing program planned for the characterization of site-specific geologic materials for the Deaf Smith County site, Texas. The study design provides for measurements of index, mechanical, thermomechanical, thermal and special properties for the host salt, and where appropriate, for nonhost lithologies. The types of tests which will be conducted are constant stress (creep) tests, constant strain (stress relaxation) tests, constant strain-rate tests, constant stress-rate tests, cyclic loading tests, hollow cylinder tests, uniaxial and triaxial compression tests, direct tension tests, indirect (triaxial) shear tests, thermal property determinations (conductivity, specific heat, expansivity, and diffusivity), fracture healing tests, thermal decrepitation tests, moisture content determinations, and petrographic and micromechanics analyses. Tests will be conducted at confining pressures up to 30 MPa and temperatures up to 300/degree/C. These data are used to construct mathematical models for the phenomenology of salt deformation. The models are then used in finite-element codes to predict repository response. A tentative testing schedule and milestone log are given. The duration of the testing program is expected to be approximately 5 years. 44 refs., 13 figs., 13 tabs

  7. Site Study Plan for land use, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Land Use Site Study Plan describes a field program consisting of characterization of the site; seismic survey rights-of-way and transportation and utility corridors, the vicinity, the region, future land use, and monitoring land-use change. Aerial photography will be used to characterize the site, seismic rows and transportation and utility corridors, and the vicinity. The resulting land-use maps and overlays will then be verified in the field. Interviews with farm managers and local experts will provide additional information. A Geographic Information System (GIS) and satellite imagery will be used to characterize the region, monitor land-use change, and provide information to assist with the future land use study. The site study plan describes the study design and rationale, the filed data collection procedures and equipment, the data analysis methods and application of results, the data management strategy, the schedule of field activities, the personnel requirements and management of the study, and the study's quality assurance program. The directives and requirements that drive these studies are derived from the Salt Repository Project Requirements Document. 51 refs; 6 figs; 3 tabs

  8. Site Study Plan for Aesthetics, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Aesthetic Site Study Plan describes a field program consisting of identification of the visually affected area; determination of scenic quality, visual sensitivity, and visual management classes of the site and vicinity; and analysis of the level of visual contrast that would be created by the project. Field ratings of scenic quality, visual sensitivity, and visual contrast will be supplemented by a public perception survey designed to incorporate the views of the public. This plan describes the need for the study, the study design, data management and use, schedule for proposed activities, and quality assurance program. This study will provide data needed to satisfy requirements contained in, or derived from, SRPO Requirement Document (SRP-RD). 35 refs., 6 figs., 2 tabs

  9. Site Study Plan for Acoustics, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Acoustics site study plan describes a field program which characterizes existing sound levels, determines the area's sound propagation characteristics, and monitors the project-related sound emissions. The plan describes for each study: the need for the study, study design, data management and use, schedule, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Requirements Document. 37 refs., 9 figs., 3 tabs

  10. Texas situation

    International Nuclear Information System (INIS)

    Avant, R.V. Jr.; Bowmer, W.J.

    1986-01-01

    The Texas Low-Level Radioactive Waste Disposal Authority was formed in 1981 to address the Texas low-level radioactive waste problem consistent with the direction of P.L. 96-573. The Authority has completed technical tasks, including source term evaluations, preliminary conceptual designs, economic assessments, and long-range planning, and has work in progress on facility design, site selection, operating procedures, and licensing. Site selection has been the major technical activity and will be completed in 1987 after on-site evaluations of potential sites. The Authority expects to have its site licensed and operating in 1992. Texas has been the leader in site selection. Political concerns and the uncertainty of the national agenda led Texas policy makers to slow down the state's progress. The lessons learned through the Texas situation should be instructive to other states and compacts and may well be a prediction of events for these other groups. This paper discusses the background and status of Texas development activities, future plans, and lessons learned

  11. Summary of the engineering assessment of inactive uranium mill tailings: Falls City site, Falls City, Texas

    International Nuclear Information System (INIS)

    1981-10-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Falls City site in order to update the December 1977 engineering assessment of the problems resulting from the existence of radioactive uranum mill tailings at Falls City, Texas. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrolgy and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 2.5 million tons of tailings at the Falls City site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material, to removal of the tailings to remote disposal sites and decontamination of the tailings site. Cost estimates for the four options range from about $21,700,000 for stabilization in place, to about $35,100,000 for disposal at a distance of about 15 mi. Three principal alternatives for the reprocessing of the Falls City tailings were examined: heap leaching; treatment at an existing mill; reprocessing at a new conventional mill constructed for tailings reprocessing. The tailings piles are presently being rewashed for uranium recovery by Solution Engineering, Inc. The cost for further reprocessing would be about $250/lb of U 3 O 8 . The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery does not appear to be economically attractive for the foreseeable future

  12. Comment and response document for the long-term surveillance plan for the Falls City disposal site, Falls City, Texas

    International Nuclear Information System (INIS)

    1996-11-01

    This is the Comment and Response Document dated November 1996 for the Long-Term Surveillance Plan for the Falls City Disposal Site in Falls City, Texas. The site is part of the U.S. DOE's Uranium Mill Tailings Remedial Action Project (UMTRA). Several comments regarding the hydrology and surface erosion described in the Long-Term Surveillance Plan are addressed in this document

  13. Site study plan for ecology, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary Draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Ecology Site Study Plan describes a field program consisting of studies which include surveys for endangered, threatened, and candidate species; vegetation characterization, including mapping and cover typing, plant succession, wetlands description, and preexisting stresses; and wildlife community characterization, including availability and quality of habitats and descriptions of mammal, bird, reptile, amphibian, and invertebrate populations. The plan for each study describes the need for the study, study design, data management and use, schedule and personnel requirements, and quality assurance. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document (SRP-RD). 83 refs., 3 tabs

  14. Site study plan for Deep Hydronest Test Wells, Deaf Smith County Site, Texas: Preliminary draft

    International Nuclear Information System (INIS)

    1987-05-01

    Wells called Deep Hydronest Wells will be installed at six locations at the Deaf Smith County Site to characterize hydraulic parameters in the geologic column between the top of the San Andres Formation and the base of Pennsylvanian System. Three hydronests will be drilled during early stages of site characterization to provide data for performance assessment modeling. Four wells are proposed for each of these 3 nests. Results of drilling, testing, and preliminary modeling will direct drilling and testing activities at the last 3 nests. Two wells are proposed at each of the last 3 nests for a total of 18 wells. The Salt Repository Project (SRP) Networks specify the schedule under which this program will operate. Drilling and hydrologic testing of the first Deep Hydronest will begin early in the Surface Investigation Program. Drilling and testing of the first three Deep Hydronests will require about 18 months. After 12 months of evaluating and analyzing data from the first three hydronests, the remaining three hydronests will be drilled during a 12-month period. The Technical Field Services Contractor is responsible for conducting the field program. Samples and data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be used to assure that activities affecting quality are performed correctly and that the appropriate documentation is maintained. 36 refs., 20 figs., 6 tabs

  15. Site Study Plan for soils, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Soils Site Study Plan describes a field program consisting of a soil characterization survey, impact monitoring of soils, predisturbance soil salinity survey, and a reclamation suitability study. This information will be used to plan for soil stripping, stockpiling, and replacement; reclamation of soils; determining predisturbance chemical and physical characteristics of the soils; including salinity levels; and monitoring for changes in chemical and physical characteristics of the soil. The SSP describes for each study the need for the study, the study design, data management and use, schedule of proposed activities, and the quality assurance program. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document. 75 refs., 10 figs., 5 tabs

  16. Potential development of an intercity passenger transit system in Texas : final project report.

    Science.gov (United States)

    2010-05-01

    This report describes the findings of a research study of the potential for development of an intercity rail and : express bus system in the state of Texas. Rather than focus on regional commuter or light rail systems : radiating from urban areas, th...

  17. 40 CFR 272.2201 - Texas State-Administered Program: Final Authorization.

    Science.gov (United States)

    2010-07-01

    ... Recycling Act, sections 371.0025(b) and (c), 371.024(a), 371.024(c) and (d), 371.026(a) and (b), 371.028... title (relating to Purpose) * * * § 55.21 of this title (relating to Requests for Contested Case..., sections 361.131 through 140; Chapter 371, Texas Oil Collection, Management, and Recycling Act, sections...

  18. Public health assessment for French Limited, Crosby, Harris County, Texas, Region 6. CERCLIS No. TXD980514814. addendum. Final report

    International Nuclear Information System (INIS)

    1993-01-01

    The French Limited Site is a former petroleum based waste disposal site located in Harris County about 20 miles northeast of Houston, Texas. Although there is evidence of past exposure to site contaminants, the site currently poses no apparent public health hazard. Since part of the remediation process involves aerating the lagoon, future inhalation exposure to volatile organic compounds through inhalation is possible. Modeling data, based on fenceline measurements taken during lagoon aeration, were used to estimate contaminant concentrations in each of the surrounding communities. The ambient air concentrations predicted by the model, for each of the communities, are upper-bound estimates and greatly overestimate actual ambient air levels. Based on the predicted values, the residents in the surrounding communities have no apparent increased lifetime risk of developing cancer from exposure to these contaminants

  19. Final environmental statement related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1986-08-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of the South Texas Project, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation. Land use and terrestrial and aquatic ecological impacts will be small. No operational impacts to historic and archeological sites are anticipated. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project are anticipated to be minimal. The action called for is the issuance of an operating license for South Texas Project, Units 1 and 2

  20. High energy physics program at Texas A&M University. Final report, April 1, 1990--March 31, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The Texas A&M experimental high energy physics program has been supported since its inception by DOE Contract DE-AS05-81ER40039. During that period we established a viable experimental program at a university which before this time had no program in high energy physics. In 1990, the experimental program was augmented with a program in particle theory. In the accompanying final report, we outline the research work accomplished during the final year of this contract and the program being proposed for consideration by the Department of Energy for future grant support. Some of the particular areas covered are: Collider detector at Fermilab program; the TAMU MACRO program; SSC R&D program; SSC experimental program; and theoretical physics program.

  1. Texas geothermal R D and D program planning support document. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Davis, R.J.; Conover, M.F.; Keeney, R.C.; Personett, M.L.; Richmann, D.L.

    1981-08-28

    Program planning support was provided by; developing a geothermal RD and D program structure, characterizing the status of geothermal RD and D through review of literature and interaction with the geothermal research community, developing a candidate list of future Texas geothermal projects, and prioritizing the candidate projects based on appropriate evaluation criteria. The method used to perform this study and the results thereof are presented. Summary reviews of selected completed and ongoing projects and summary descriptions and evaluations of the candidate RD and D projects ar provided. A brief discussion emerging federal RD and D policies is presented. References and independent project rankings by three of the GRP members are included. (MHR)

  2. The Finnish final disposal programme proceeds to the site selection

    International Nuclear Information System (INIS)

    Seppaelae, T.

    1999-01-01

    Research for the selection of the final disposal site has been carried out already since the beginning of 1980's. Field studies were started in 1987: In the recent years, studied sites have included Olkiluoto in Eurajoki, Haestholmen in Loviisa, Romuvaara in Kuhmo and Kivetty in Aeaenekoski. Based on 40 years operation of four power plant units, the estimate for the accumulation of spent fuel to be disposed of in Finland is 2,600 tU. A 'Decision in Principle' is needed from the Finnish government to select the final disposal site, Posiva submitted the application for a policy decision in May 1999. The intended site of the facility is Olkiluoto which produces most of the spent fuel in Finland: A disposal would minimise the need of transports. In a poll among the inhabitants of Eurajoki, 60 per cent approved the final disposal facility. After a positive decision of the government, Posiva will construct an underground research facility in Olkiluoto. The construction of the final disposal facility will take place in the 2010's, the facility should be operational in 2020. (orig.) [de

  3. Study of neutron focusing at the Texas Cold Neutron Source. Final report

    International Nuclear Information System (INIS)

    Wehring, B.W.; Uenlue, K.

    1995-01-01

    Funds were received for the first year of a three year DOE Nuclear Engineering Research Grant, ''Study of Neutron Focusing at the Texas Cold Neutron Source'' (FGO2-92ER75711). The purpose of this three year study was to develop a neutron focusing system to be used with the Texas Cold Neutron Source (TCNS) to produce an intense beam of neutrons. A prompt gamma activation analysis (PGAA) facility was also to be designed, setup, and tested under the three year project. During the first year of the DOE grant, a new procedure was developed and used to design a focusing converging guide consisting of truncated rectangular cone sections. Detailed calculations were performed using a 3-D Monte Carlo code which we wrote to trace neutrons through the curved guide of the TCNS into the proposed converging guide. Using realistic reflectivities for Ni-Ti supermirrors, we obtained gains of 3 to 5 for the neutron flux averaged over an area of 1 x 1 cm

  4. Site selection - siting of the final repository for spent nuclear fuel

    International Nuclear Information System (INIS)

    2011-03-01

    SKB has selected Forsmark as the site for the final repository for spent nuclear fuel. The site selection is the end result of an extensive siting process that began in the early 1990s. The strategy and plan for the work was based on experience from investigations and development work over a period of more than ten years prior to then. This document describes the siting work and SKB's choice of site for the final repository. It also presents the information on which the choice was based and the reasons for the decisions made along the way. The document comprises Appendix PV to applications under the Nuclear Activities Act and the Environmental Code for licences to build and operate an encapsulation plant adjacent to the central interim storage facility for spent nuclear fuel in Oskarshamn, and to build and operate a final repository for spent nuclear fuel in Forsmark in Oesthammar Municipality

  5. Site selection - siting of the final repository for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    2011-03-15

    SKB has selected Forsmark as the site for the final repository for spent nuclear fuel. The site selection is the end result of an extensive siting process that began in the early 1990s. The strategy and plan for the work was based on experience from investigations and development work over a period of more than ten years prior to then. This document describes the siting work and SKB's choice of site for the final repository. It also presents the information on which the choice was based and the reasons for the decisions made along the way. The document comprises Appendix PV to applications under the Nuclear Activities Act and the Environmental Code for licences to build and operate an encapsulation plant adjacent to the central interim storage facility for spent nuclear fuel in Oskarshamn, and to build and operate a final repository for spent nuclear fuel in Forsmark in Oesthammar Municipality

  6. Sonar atlas of caverns comprising the U.S. Strategic Petroleum Reserve. Volume 2, Big Hill Site, Texas.

    Energy Technology Data Exchange (ETDEWEB)

    Rautman, Christopher Arthur; Lord, Anna Snider

    2007-08-01

    Downhole sonar surveys from the four active U.S. Strategic Petroleum Reserve sites have been modeled and used to generate a four-volume sonar atlas, showing the three-dimensional geometry of each cavern. This volume 2 focuses on the Big Hill SPR site, located in southeastern Texas. Volumes 1, 3, and 4, respectively, present images for the Bayou Choctaw SPR site, Louisiana, the Bryan Mound SPR site, Texas, and the West Hackberry SPR site, Louisiana. The atlas uses a consistent presentation format throughout. The basic geometric measurements provided by the down-cavern surveys have also been used to generate a number of geometric attributes, the values of which have been mapped onto the geometric form of each cavern using a color-shading scheme. The intent of the various geometrical attributes is to highlight deviations of the cavern shape from the idealized cylindrical form of a carefully leached underground storage cavern in salt. The atlas format does not allow interpretation of such geometric deviations and anomalies. However, significant geometric anomalies, not directly related to the leaching history of the cavern, may provide insight into the internal structure of the relevant salt dome.

  7. Sonar atlas of caverns comprising the U.S. Strategic Petroleum Reserve. Volume 3, Bryan Mound Site, Texas.

    Energy Technology Data Exchange (ETDEWEB)

    Rautman, Christopher Arthur; Lord, Anna Snider

    2007-09-01

    Downhole sonar surveys from the four active U.S. Strategic Petroleum Reserve sites have been modeled and used to generate a four-volume sonar atlas, showing the three-dimensional geometry of each cavern. This volume 3 focuses on the Bryan Mound SPR site, located in southeastern Texas. Volumes 1, 2, and 4, respectively, present images for the Bayou Choctaw SPR site, Louisiana, the Big Hill SPR site, Texas, and the West Hackberry SPR site, Louisiana. The atlas uses a consistent presentation format throughout. The basic geometric measurements provided by the down-cavern surveys have also been used to generate a number of geometric attributes, the values of which have been mapped onto the geometric form of each cavern using a color-shading scheme. The intent of the various geometrical attributes is to highlight deviations of the cavern shape from the idealized cylindrical form of a carefully leached underground storage cavern in salt. The atlas format does not allow interpretation of such geometric deviations and anomalies. However, significant geometric anomalies, not directly related to the leaching history of the cavern, may provide insight into the internal structure of the relevant salt dome.

  8. Petroleum potential of two sites in Deaf Smith and Swisher Counties, Texas Panhandle: Volume 1: Technical report

    International Nuclear Information System (INIS)

    Rose, P.R.

    1986-09-01

    This is the third in a series of regional geologic studies to assess the petroleum resources of two potentially acceptable sites under study for a nuclear waste disposal facility. Site 1 is in northeastern Deaf Smith County, Texas, and Site 2 is in northeastern Swisher County, Texas. Although potential reservoir zones are present under Site 1, the likelihood of hydrocarbon charge and structural or stratigraphic entrapment is low. The probability of a commercial petroleum discovery is estimated at 1:1000, and expected net present value of potential production is about $700,000. Little future industry drilling activity is foreseen around Site 1. Five potential reservoir zones are present under Site 2, and some may contain hydrocarbons. Anticlines are adjacent to Site 2, and some may contain hydrocarbons. Anticlines are adjacent to Site 2 on the northeast, southeast, and northwest, but the middle of the acreage block is synclinal, and its petroleum potential is very low. Discovery probability of the structures adjacent to Site 2 is higher, but the chance of developing commercial production is only about 2:100. Such accumulations might extend into the northeast and southeast corners of the block; expected net present value of such conjectured reserves is about $1,100,000 and $650,000, respectively. Continued industry activity pursuant to these three structures is expected, including seismic surveys and drilling. Considering the potential loss of petroleum resources through withdrawal of acreage from exploration, and the possibility of adjacent drilling, Site 1 in Deaf Smith County is clearly preferable for location of the proposed nuclear waste disposal facility

  9. South Texas project, Units 1 and 2: Final environmental statement (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1975-03-01

    The proposed action is the issuance of a construction permit to the Houston Lighting and the Power Company, acting as Project manager on behalf of itself, the City Public Service Board of San Antonio, Central Power and Light Company, and the City of Austin, for the construction of the South Texas Project (STP) Units 1 and 2, located in Matagorda County, Texas. A total of 12,352 acres will be utilized for the STP site. Construction-related activities on the site will disturb about 610 acres not including the 7310 acres of inundated by the STP cooling lake and embankments, which will be constructed in conjunction with the project. Approximately 400 miles of transmission-line corridors will require about 5685 acres of land for the right-of-way. An access road and a railroad spur will affect about 60 acres. Farm to Market Road 521 will be rerouted north around the STP exclusion area. Plant construction will involve extensive community impacts. Two families will be displaced from the site. Traffic on local roads will increase due to construction and commuting activities. The influx of construction workers' families (2100 peak work force) is expected to cause no major housing or school problems. There will be a demand for increased services in Matagorda County. The proposed plan to alter Little Robbins Slough and the resultant 65% reduction in the watershed supplying freshwater inflow to the upper marsh may cause the displacement of numerous freshwater species and reduce its desirability as a nursery for estuarine-dependent organisms. Studies to determine the need for freshwater makeup will be required. 39 figs., 76 tabs

  10. Texas Hydrogen Highway Fuel Cell Hybrid Bus and Fueling Infrastructure Technology Showcase - Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hitchcock, David

    2012-06-29

    The Texas Hydrogen Highway project has showcased a hydrogen fuel cell transit bus and hydrogen fueling infrastructure that was designed and built through previous support from various public and private sector entities. The aim of this project has been to increase awareness among transit agencies and other public entities on these transportation technologies, and to place such technologies into commercial applications, such as a public transit agency. The initial project concept developed in 2004 was to show that a skid-mounted, fully-integrated, factory-built and tested hydrogen fueling station could be used to simplify the design, and lower the cost of fueling infrastructure for fuel cell vehicles. The approach was to design, engineer, build, and test the integrated fueling station at the factory then install it at a site that offered educational and technical resources and provide an opportunity to showcase both the fueling station and advanced hydrogen vehicles. The two primary technology components include: Hydrogen Fueling Station: The hydrogen fueling infrastructure was designed and built by Gas Technology Institute primarily through a funding grant from the Texas Commission on Environmental Quality. It includes hydrogen production, clean-up, compression, storage, and dispensing. The station consists of a steam methane reformer, gas clean-up system, gas compressor and 48 kilograms of hydrogen storage capacity for dispensing at 5000 psig. The station is skid-mounted for easy installation and can be relocated if needed. It includes a dispenser that is designed to provide temperaturecompensated fills using a control algorithm. The total station daily capacity is approximately 50 kilograms. Fuel Cell Bus: The transit passenger bus built by Ebus, a company located in Downey, CA, was commissioned and acquired by GTI prior to this project. It is a fuel cell plug-in hybrid electric vehicle which is ADA compliant, has air conditioning sufficient for Texas operations

  11. Environmental Safety and Health Analytical Laboratory, Pantex Plant, Amarillo, Texas. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-06-01

    The US Department of Energy (DOE) has prepared an Environmental Assessment (EA) of the construction and operation of an Environmental Safety and Health (ES ampersand H) Analytical Laboratory and subsequent demolition of the existing Analytical Chemistry Laboratory building at Pantex Plant near Amarillo, Texas. In accordance with the Council on Environmental Quality requirements contained in 40 CFR 1500--1508.9, the Environmental Assessment examined the environmental impacts of the Proposed Action and discussed potential alternatives. Based on the analysis of impacts in the EA, conducting the proposed action, construction of an analytical laboratory and demolition of the existing facility, would not significantly effect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA) and the Council on Environmental Quality regulations in 40 CFR 1508.18 and 1508.27

  12. Final disposal of spent nuclear fuel - basis for site selection

    International Nuclear Information System (INIS)

    Anttila, P.

    1995-05-01

    International organizations, e.g. IAEA, have published several recommendations and guides for the safe disposal of radioactive waste. There are three major groups of issues affecting the site selection process, i.e. geological, environmental and socioeconomic. The first step of the site selection process is an inventory of potential host rock formations. After that, potential study areas are screened to identify sites for detailed investigations, prior to geological conditions and overall suitability for the safe disposal. This kind of stepwise site selection procedure has been used in Finland and in Sweden. A similar approach has been proposed in Canada, too. In accordance with the amendment to the Nuclear Energy Act, that entered into force in the beginning of 1995, Imatran Voima Oy has to make preparations for the final disposal of spent fuel in the Finnish bedrock. Relating to the possible site selection, the following geological factors, as internationally recommended and used in the Nordic countries, should be taken into account: topography, stability of bedrock, brokenness and fracturing of bedrock, size of bedrock block, rock type, predictability and natural resources. The bedrock of the Loviisa NPP site is a part of the Vyborg rapakivi massif. As a whole the rapakivi granite area forms a potential target area, although other rock types or areas cannot be excluded from possible site selection studies. (25 refs., 7 figs.)

  13. Protective barrier systems for final disposal of Hanford Waste Sites

    International Nuclear Information System (INIS)

    Phillips, S.J.; Hartley, J.N.

    1986-01-01

    A protecting barrier system is being developed for potential application in the final disposal of defense wastes at the Hanford Site. The functional requirements for the protective barrier are control of water infiltration, wind erosion, and plant and animal intrusion into the waste zone. The barrier must also be able to function without maintenance for the required time period (up to 10,000 yr). This paper summarizes the progress made and future plans in this effort to design and test protective barriers at the Hanford Site

  14. Public Outreach of the South Texas Health Physic Society and Texas A and M University Nuclear Engineering Department

    International Nuclear Information System (INIS)

    Berry, R. O.

    2003-01-01

    In a cooperative effort of the members of the South Texas Chapter of the Heath Physics Society (STC-HPS) and the Texas A and M University Nuclear Engineering Department, great efforts have been made to reach out and provide educational opportunities to members of the general public, school age children, and specifically teachers. These efforts have taken the form of Science Teacher Workshops (STW), visits to schools all over the state of Texas, public forums, and many other educational arenas. A major motivational factor for these most recent efforts can be directly tied to the attempt of the State of Texas to site a low-level radioactive waste facility near Sierra Blanca in West Texas. When the State of Texas first proposed to site a low level radioactive waste site after the Low-Level Radioactive Waste Policy Act of 1980 was passed, many years of political struggle ensued. Finally, a site at Sierra Blanca in far West Texas was selected for study and characterization for a disposal site for waste generated in the Texas Compact states of Maine, Vermont and Texas. During this process, the outreach to and education of the local public became a paramount issue

  15. Phase II, Title I engineering assessment of inactive uranium mill tailings, Falls City Site, Falls City, Texas

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at Falls City, Texas. Services included taking soil samples, the performance of radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 2.5 million tons of tailings at the Falls City site constitutes the most significant environmental impact. Windblown tailings, external gamma radiation and localized contamination of surface waters are other environmental effects. The two alternative remedial action options presented include on-site and off-site cleanup, fencing, and hydrological monitoring, and in addition, stabilization of pile 2 with 2 ft of cover material. The costs are $1.84 million for Option I and $2.45 million for Option II

  16. Summary of the Phase II, Title I engineering assessment of inactive uranium mill tailings, Falls City Site, Falls City, Texas

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at Falls City, Texas. Services included taking soil samples, the performance of radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 2.5 million tons of tailings at the Falls City site constitutes the most significant environmental impact. Windblown tailings, external gamma radiation and localized contamination of surface waters are other environmental effects. The two alternative remedial action options presented include on-site and off-site cleanup, fencing, and hydrological monitoring and, in addition, stabilization of pile 2 with 2 ft of cover material. The costs are $1.84 million and $2.45 million

  17. Engineering assessment of inactive uranium mill tailings, Ray Point Site, Ray Point, Texas. Phase II, Title I

    International Nuclear Information System (INIS)

    1977-12-01

    Results are reported from an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Ray Point, Texas. The Phase II--Title I services generally include the preparation of topographic maps, the performance of soil sampling and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. About 490,000 tons of ore were processed at this mill with all of the uranium sold on the commercial market. None was sold to the AEC; therefore, this report focuses on a physical description of the site and the identification of radiation pathways. No remedial action options were formulated for the site, inasmuch as none of the uranium was sold to the AEC and Exxon Corporation has agreed to perform all actions required by the State of Texas. Radon gas release from the tailings at the Ray Point site constitutes the most significant environmental impact. Windblown tailings, external gamma radiation and localized contamination of surface waters are other environmental effects. Exxon is also studying the feasibility of reprocessing the tailings

  18. The University of Texas Science and Engineering Apprentice Program as a Model for an REU Site

    Science.gov (United States)

    Davis, M. B.; Blankenship, D. D.; Ellins, K. E.

    2004-12-01

    The University of Texas Institute for Geophysics at (UTIG) is one of five research labs in the Austin area that hosts recent high school graduates for summer research projects through the Applied Research Lab Science and Engineering Apprenticeship Program (SEAP). The SEAP is a program designed to provide summer research opportunities to recent high school undergraduates who excel in science and math. UTIG has been a large proponent of the SEAP and has typically mentored two to four students each year and a total alumni of about twenty. The program has successfully targeted groups that are typically underrepresented in sciences and engineering. Current statistics show that 25% of past SEAP students are members of an ethnic minority and 80% of SEAP students are female. Many of these students have stayed on after the summer program and continued to work part-time or return during summers to UTIG while completing their undergraduate careers. A significant portion of these students present results at professional meetings and ultimately commit to careers in science and engineering, both in industry and academia. SEAP students at UTIG work alongside scientists and graduate students as part of a team, and, through this interaction, improve their scientific knowledge and problem solving skills. Both graduate and undergraduate students involved in NSF-funded research grants mentor the SEAP students, giving them the opportunity to work on their own research problem while contributing data and interpretation to a more fundamental research problem. By uniting student research under the umbrella of Antarctic ice sheet research, students learn how their individual research projects relate to the more unifying science problem centered on ice sheet variability, and Antarctic continental evolution. They also gain an understanding of how research is carried out. At the same time, scientists and graduate students learn how to communicate their knowledge so that it is interesting and

  19. Multispectral image analysis of the Palo Duro Basin, Texas: Final report

    International Nuclear Information System (INIS)

    Andre, C.G.

    1986-09-01

    The objectives of this remote sensing study of the Palo Duro Basin are to: (1) detect the surface expression of regional subsurface structure; (2) locate previously unrecognized fractures; (3) interpret the data in terms of the geologic history of the Palo Duro Basin. Linear and circular surface features were mapped from Landsat 4 Thematic Mapper and NOAA-7 Advanced Very High Resolution Radiometer digital images of visible, near-infrared and thermal infrared bands. The density and orientation of features mapped are shown to be related to geological features, such as faults, structural arches, paleoerosion topography and salt dissolution zones. The approximate area covered by the three 185 km /times/ 170 km Thematic Mapper images studied extends southward from the Canadian River Breaks to the Sand Hills and eastward from the western Mountains in Oklahoma. The day and night thermal infrared images from the NOAA-7 satellite encompass an area that includes the northern half of Texas and most of the surrounding states to the east, west and north. 4 refs

  20. Aerial gamma ray and magnetic survey, Van Horn and Pecos Quadrangles, Texas. Volume I. Final report

    International Nuclear Information System (INIS)

    1977-10-01

    A high sensitivity, airborne radiometric and magnetic survey of portions of the Big Bend, Texas area was conducted. The project area comprising the Van Horn and Pecos 1:250,000 NTMS sheets, consists of approximately 16,400 square miles. A total of 6,666 line miles of high sensitivity radiometric and magnetic data were collected. Traverse lines were flown at a spacing of 3.125 miles in an east/west direction with tie lines flown in a north/south direction at a 18.375 miles separation. All data were collected utilizing a fixed wing aircraft, Grumman G-89 and over 3,500 cubic inches of NaI crystal detector. Magnetometer data were collected utilizing a high sensitivity, 0.25 gamma, proton magnetometer. Data were digitally recorded at 0.5 second intervals. All field data were returned to the computer facilities for processing, statistical analysis, and interpretation. Other data are presented which include corrected profiles of all radiometric variables, magnetic data, radar altimeter data, barometric altimeter data, air temperature and airborne Bismuth contributions. Data presented have been summed to provide 1.0 second equivalent sample intervals, corrected for Compton Scatter, altitude dependence and atmospheric Bismuth. These data are presented in the form of strip charts, microfiche, and digital magnetic tapes containing raw spectral data, single record data, magnetic data, and statistical analysis results. In addition, computer generated anomaly maps along with interpretation maps are presented relating mapped geology to the collected radiometric data

  1. The DOE infrastructure support program at the University of Texas at El Paso. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    The University of Texas at El Paso (UTEP) is located on 300 acres, only a few hundred years from the US/Mexico border. The DOE Infrastructure Support Program was initiated at UTEP in 1987. The purpose of the program was to assist the University in building the infrastructure required for its emerging role as a regional center for energy-related research. Equally important was the need to strength the University`s ability to complete for sponsored energy-related programs at the state and national levels and to provide opportunities for faculty, staff and students to participate in energy-related research and outreach activities. The program had four major objectives, as follows: (1) implement energy research, outreach and demonstration projects already funded, and prepare new proposals to fund university research interests; (2) establish an Energy Center as a separate operational entity to provide continuing infrastructure support for energy-related programs; (3) strengthen university/private sector energy research linkages; and (4) involve minority graduate and undergraduate students in energy research and outreach activities. Each of the above objectives has been exceeded substantially, and, as a consequence, the University has become a regional leader in energy and environmental research and outreach efforts.

  2. Direct utilization of geothermal energy for space and water heating at Marlin, Texas. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Conover, M.F.; Green, T.F.; Keeney, R.C.; Ellis, P.F. II; Davis, R.J.; Wallace, R.C.; Blood, F.B.

    1983-05-01

    The Torbett-Hutchings-Smith Memorial Hospital geothermal heating project, which is one of nineteen direct-use geothermal projects funded principally by DOE, is documented. The five-year project encompassed a broad range of technical, institutional, and economic activities including: resource and environmental assessments; well drilling and completion; system design, construction, and monitoring; economic analyses; public awareness programs; materials testing; and environmental monitoring. Some of the project conclusions are that: (1) the 155/sup 0/F Central Texas geothermal resource can support additional geothermal development; (2) private-sector economic incentives currently exist, especially for profit-making organizations, to develop and use this geothermal resource; (3) potential uses for this geothermal resource include water and space heating, poultry dressing, natural cheese making, fruit and vegetable dehydrating, soft-drink bottling, synthetic-rubber manufacturing, and furniture manufacturing; (4) high maintenance costs arising from the geofluid's scaling and corrosion tendencies can be avoided through proper analysis and design; (5) a production system which uses a variable-frequency drive system to control production rate is an attractive means of conserving parasitic pumping power, controlling production rate to match heating demand, conserving the geothermal resource, and minimizing environmental impacts.

  3. Disbursement of $65 million to the State of Texas for construction of a Regional Medical Technology Center at the former Superconducting Super Collider Site, Waxahachie, Texas

    International Nuclear Information System (INIS)

    1995-05-01

    As part of a settlement agreement between the US DOE and the State of Texas, DOE proposes to transfer $65 million of federal funds to the Texas National Research Laboratory Commission (TNLRC) for construction of the Regional Medical Technology Center (RMTC) to be located in Ellis County, Texas. The RMTC would be a state-of-the-art medical facility for proton cancer therapy, operated by the State of Texas in conjunction with the University of Texas Southwestern Medical Center. The RMTC would use the linear accelerator assets of the recently terminated DOE Superconducting Super Collider Project to accelerate protons to high energies for the treatment of cancer patients. The current design provides for treatment areas, examination rooms, support laboratories, diagnostic imaging equipment, and office space as well as the accelerators (linac and synchrotron) and beam steering and shaping components. The potential environmental consequences of the proposed action are expected to be minor

  4. Dealing with the inevitable: Strategies of self-presentation and meaning construction in the final statements of inmates on Texas death row

    NARCIS (Netherlands)

    Schuck, A.R.T.; Ward, J.

    2008-01-01

    Last statements of death row inmates represent a genre of discourse characterized by an acute situation in which to express final reflections. This article describes how Texas death row inmates give meaning to their situation by examining their last statements. Between December 1982 and November

  5. LANL environmental restoration site ranking system: System description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Merkhofer, L.; Kann, A.; Voth, M. [Applied Decision Analysis, Inc., Menlo Park, CA (United States)

    1992-10-13

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides.

  6. LANL environmental restoration site ranking system: System description. Final report

    International Nuclear Information System (INIS)

    Merkhofer, L.; Kann, A.; Voth, M.

    1992-01-01

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides

  7. 77 FR 13248 - Texas: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-03-06

    ... Commission on Environmental Quality, (TCEQ) 12100 Park S. Circle, Austin TX 78753- 3087, (512) 239-6079... INFORMATION: For additional information, please see the immediate final rule published in the ``Rules and...

  8. National Register Testing of 19 Prehistoric Archeological Sites on Fort Hood, Texas: The 1995 Season

    Science.gov (United States)

    1999-07-01

    arboreal species include ash (Fraxinus sp.), redbud (Cercis canadensis), hack- berry (Celtis sp.), Texas persimmon ( Diospyros texana), and Mexican...from flotation of hearth fill were identified as Celtis sp. nutlets, woody legume, Rosaceae wood, and Diospyros virginiana wood, the latter...early 1990s. For consistency, all of their studies have focused on a single genus , Rabdotus sp., that is abundant in the archeological deposits at

  9. Industrial Sites Project Establishment of Final Action Levels

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2006-01-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) oversees numerous sites on the Nevada Test Site (NTS) and other locations in the State of Nevada that have been impacted by activities related to the development and testing of nuclear devices and by other activities. NNSA/NSO is responsible for protecting members of the public, including site workers, from harmful exposure to both chemical and radiological contaminants at these sites as they remediate these sites. The Nevada Division of Environmental Protection (NDEP) is the primary state agency responsible for protection of human health and the environment with respect to chemical and radiological wastes. In 1996 the DOE, U.S. Department of Defense, and the State of Nevada entered into an agreement known as the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Appendix VI to the FFACO describes the strategy employed to plan, implement, and complete environmental corrective action activities at NTS and other locations in the state of Nevada. One of the categories of corrective action units (CAUs) is Industrial Sites, which consists of approximately 1,150 locations that may require some level of investigation and corrective action. To evaluate the need for the extent of corrective action at a particular site, NNSA/NSO assesses the potential impacts to receptors by comparing measurements of contaminant concentrations to risk-based (chemical) and dose-based (radionuclide) standards (action levels). Preliminary action levels (PALs) are established as part of the data quality objective (DQO) process, and are presented in one or more FFACO documents generated as part of the corrective action process. This document formally defines and clarifies the NDEP-approved process NNSA/NSO Industrial Sites Project uses to fulfill the requirements of the FFACO and state regulations. This process establishes final action levels (FALs) based on the risk

  10. High energy physics program at Texas A and M University. Final report, April 1, 1995 - March 31, 1996

    International Nuclear Information System (INIS)

    1995-12-01

    The experimental and theoretical high energy physics programs at Texas A ampersand M University have continued their vigorous research activities over the past year. This is the final report on activities which have been supported through DOE grant DE-FG05-91ER40633. This report covers the period January 1, 1995 to December 31, 1995. The project includes a component which has used the Fermilab Tevatron, as part of the Collider Detector (CDF) collaboration. They have been involved in operations and theory work on supersymmetry (SUSY). Another component works with the MACRO experiment at the Gran Sasso Laboratory in l'Aquila, Italy, to study magnetic monopoles, astrophysical neutrinos, and cosmic ray phenomena. A third effort has been involved in developing an Expression of Interest and a Fermilab proposal for a large fine-grained magnetic sampling detector to be used for studying events inducted by accelerator or atmospheric neutrinos as a way to search for neutrino oscillations (MINOS). Finally the theoretical effort has addressed string theory, model building, SUSY phenomenology, astroparticle physics, and brain function and quantum mechanics

  11. 77 FR 55896 - Notice of Final Federal Agency Actions on Loop 1 in Texas

    Science.gov (United States)

    2012-09-11

    ... Indian Religious Freedom Act [42 U.S.C. 1996]; Farmland Protection Policy Act (FPPA) [7 U.S.C. 4201- 4209... Protection and Enhancement of Cultural Resources; E.O. 13007 Indian Sacred Sites; E.O. 13287 Preserve America...

  12. Preliminary access routes and cost study analyses for seven potentially acceptable salt sites: Final report, October 1984

    International Nuclear Information System (INIS)

    1987-02-01

    This report analyzes highway and railroad access to seven potentially acceptable salt repository sites: Richton Dome and Cypress Creek Dome in Mississippi, Vacherie Dome in Louisiana, Swisher County and Deaf Smith County in Texas, and Davis Canyon and Lavender Canyon in utah. The objectives of the study were to investigate the routing of reasonable access corridors to the sites, describe major characteristics of each route, and estimate the costs for constructing or upgrading highways and railroads. The routes used in the analysis are not necessarily recommended or preferred over other routes, nor do they represent an implied final selection. Detailed engineering studies must be performed for the Davis Canyon and Lavender Canyon highway access before the analyzed routes can be considered to be viable. 20 refs., 7 figs., 3 tabs

  13. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Falls City, Texas: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This baseline risk assessment of ground water contamination of the uranium mill tailings site near Falls City, Texas, evaluates potential impact to public health and the environment resulting from ground water contamination at the former Susquehanna Western, Inc. (SWI), uranium mill processing site. This document fulfills the following objectives: determine if the site presents immediate or potential future health risks, determine the need for interim institutional controls, serve as a key input to project planning and prioritization, and recommend future data collection efforts to more fully characterize risk. The Uranium Mill Tailings Remedial Action (UMTRA) Project has begun its evaluation of ground water contamination at the Falls City site. This risk assessment is one of the first documents specific to this site for the Ground Water Project. The first step is to evaluate ground water data collected from monitor wells at or near the site. Evaluation of these data show the main contaminants in the Dilworth ground water are cadmium, cobalt, fluoride, iron, nickel, sulfate, and uranium. The data also show high levels of arsenic and manganese occur naturally in some areas.

  14. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Falls City, Texas: Revision 1

    International Nuclear Information System (INIS)

    1994-09-01

    This baseline risk assessment of ground water contamination of the uranium mill tailings site near Falls City, Texas, evaluates potential impact to public health and the environment resulting from ground water contamination at the former Susquehanna Western, Inc. (SWI), uranium mill processing site. This document fulfills the following objectives: determine if the site presents immediate or potential future health risks, determine the need for interim institutional controls, serve as a key input to project planning and prioritization, and recommend future data collection efforts to more fully characterize risk. The Uranium Mill Tailings Remedial Action (UMTRA) Project has begun its evaluation of ground water contamination at the Falls City site. This risk assessment is one of the first documents specific to this site for the Ground Water Project. The first step is to evaluate ground water data collected from monitor wells at or near the site. Evaluation of these data show the main contaminants in the Dilworth ground water are cadmium, cobalt, fluoride, iron, nickel, sulfate, and uranium. The data also show high levels of arsenic and manganese occur naturally in some areas

  15. Final Environmental Assessment for Constructing a Magnet School at Laughlin Air Force Base, Texas

    Science.gov (United States)

    2016-10-01

    people benefits , or subjecting people to discrimination or disproportionately high environmental health or safety risks. In constructing and operating...the proposed action would not have significant impacts on the following resources: air quality, noise, safety and occupational health , biological...Construction noise at the residences nearest the site would be approximately 88 dB and could be perceived as intrusive by people outdoors at those residences

  16. Direct-current resistivity profiling at the Pecos River Ecosystem Project study site near Mentone, Texas, 2006

    Science.gov (United States)

    Teeple, Andrew; McDonald, Alyson K.; Payne, Jason; Kress, Wade H.

    2009-01-01

    The U.S. Geological Survey, in cooperation with Texas A&M University AgriLife, did a surface geophysical investigation at the Pecos River Ecosystem Project study site near Mentone in West Texas intended to determine shallow (to about 14 meters below the water [river] surface) subsurface composition (lithology) in and near treated (eradicated of all saltcedar) and control (untreated) riparian zone sites during June-August 2006. Land-based direct-current resistivity profiling was applied in a 240-meter section of the riverbank at the control site, and waterborne direct-current continuous resistivity profiling (CRP) was applied along a 2.279-kilometer reach of the river adjacent to both sites to collect shallow subsurface resistivity data. Inverse modeling was used to obtain a nonunique estimate of the true subsurface resistivity from apparent resistivity calculated from the field measurements. The land-based survey showed that the sub-surface at the control site generally is of relatively low resis-tivity down to about 4 meters below the water surface. Most of the section from about 4 to 10 meters below the water surface is of relatively high resistivity. The waterborne CRP surveys convey essentially the same electrical representation of the lithology at the control site to 10 meters below the water surface; but the CRP surveys show considerably lower resistivity than the land-based survey in the subsection from about 4 to 10 meters below the water surface. The CRP surveys along the 2.279-kilometer reach of the river adjacent to both the treated and control sites show the same relatively low resistivity zone from the riverbed to about 4 meters below the water surface evident at the control site. A slightly higher resistivity zone is observed from about 4 to 14 meters below the water surface along the upstream approximately one-half of the profile than along the downstream one-half. The variations in resistivity could not be matched to variations in lithology because

  17. Solar heating and hot water system installed at office building, One Solar Place, Dallas, Texas. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    This document is the Final Report of the Solar Energy System Installed at the First Solar Heated Office Building, One Solar Place, Dallas, Texas. The Solar System was designed to provide 87 percent of the space heating needs, 100 percent of the potable hot water needs and is sized for future absorption cooling. The collection subsystem consists of 28 Solargenics, series 76, flat plate collectors with a total area of 1596 square feet. The solar loop circulates an ethylene glycol-water solution through the collectors into a hot water system heat exchanger. The hot water storage subsystem consists of a heat exchanger, two 2300 gallon concrete hot water storage tanks with built in heat exchangers and a back-up electric boiler. The domestic hot water subsystem sends hot water to the 10,200 square feet floor area office building hot water fixtures. The building cold water system provides make-up to the solar loop, the heating loop, and the hot water concrete storage tanks. The design, construction, cost analysis, operation and maintenance of the solar system are described. The system became operational July 11, 1979.

  18. Remote Sensing Analysis of the Sierra Blanca (Faskin Ranch) Low-Level Radioactive Waste Disposal Site, Hudspeth County, Texas

    International Nuclear Information System (INIS)

    LeMone, D. V.; Dodge, R.; Xie, H.; Langford, R. P.; Keller, G. R.

    2002-01-01

    Remote sensing images provide useful physical information, revealing such features as geological structure, vegetation, drainage patterns, and variations in consolidated and unconsolidated lithologies. That technology has been applied to the failed Sierra Blanca (Faskin Ranch) shallow burial low-level radioactive waste disposal site selected by the Texas Low-Level Radioactive Waste Disposal Authority. It has been re-examined using data from LANDSAT satellite series. The comparison of the earlier LANDSAT V (5/20/86) (30-m resolution) with the later new, higher resolution ETM imagery (10/23/99) LANDSAT VII data (15-m resolution) clearly shows the superiority of the LANDSAT VII data. The search for surficial indications of evidence of fatal flaws at the Sierra Blanca site utilizing was not successful, as it had been in the case of the earlier remote sensing analysis of the failed Fort Hancock site utilizing LANDSAT V data. The authors conclude that the tectonic activity at the Sierra Blanca site is much less recent and active than in the previously studied Fort Hancock site. The Sierra Blanca site failed primarily on the further needed documentation concerning a subsurface fault underneath the site and environmental justice issues. The presence of this fault was not revealed using the newer LANDSAT VII data. Despite this fact, it must be remembered that remote sensing provides baseline documentation for determining future physical and financial remediation responsibilities. On the basis of the two sites examined by LANDSAT remote sensing imaging, it is concluded that it is an essential, cost-effective tool that should be utilized not only in site examination but also in all nuclear-related facilities

  19. Final covering of the Ronneburg uranium mining site

    International Nuclear Information System (INIS)

    Hoepfner, Uwe

    2007-01-01

    The rehabilitation of WISMUT's former Ronneburg uranium mining site involves backfilling of waste rock to the Lichtenberg open pit. The relocation project comprises about 110 million m 3 of sulphide-bearing and AMD-generating waste rock which makes it the most important and most cost-intensive single surface restoration project conducted by WISMUT at the Ronneburg site. The backfilled waste rock has to be covered on an area of about 220 ha to control water infiltration and gas diffusion. Design planning for the final cover placement which began in 2004 had to be based on a comprehensive cost-benefit analysis as well on field tests of alternative cover options which are in compliance with legal requirements. An intensive testing program concerning the vadose zone of soil covers has therefore been started in 2000. The paper presents an overview of the monitoring program and the results of the vadose zone measurements. The water of soil covers have to be predicted for extended evaluation periods. Therefore water balance simulations of single layer covers (storage and evaporation concept) taking current and future soil and climate conditions into account are performed with the HYDRUS 2D code. (author)

  20. Site study plan for Upper Aquifer Hydrology Clusters, Deaf Smith County Site, Texas: Surface-based geotechnical field program: Preliminary draft

    International Nuclear Information System (INIS)

    1988-01-01

    As part of site characterization studies, at the Deaf Smith County site, Texas, 15 wells at 5 locations will be completed in the Ogallala Formation and Dockum Group. The purposes of the wells, which are called Upper Aquifer (2) establish background hydrologic and water quality conditions, (3) provide analysis, (4) monitor responses of the shallow hydrologic system to site activities and nearby pumpage for irrigation, (5) collect water samples from both saturated and unsaturated materials to help define recharge rates and ground-water flow patterns, (6) monitor variations on water quality, and (7) define ground-water resources near the site. The test wells will be installed during a 14-month period starting about 1-1/2 years after site characterization activities begin. The Technical Field Services Contractor is responsible for conducting the field program of drilling and testing. Samples and data will be handled and reported in accordance with established Salt Repository Project procedures. A quality assurance program will assure that activities affecting quality are performed correctly and that the appropriate documentation is maintained. 44 refs., 19 figs., 5 tabs

  1. Small mammal populations at hazardous waste disposal sites near Houston, Texas, USA

    Science.gov (United States)

    Robbins, C.S.

    1990-01-01

    Small mammals were trapped, tagged and recaptured in 0?45 ha plots at six hazardous industrial waste disposal sites to determine if populations, body mass and age structures were different from paired control site plots. Low numbers of six species of small mammals were captured on industrial waste sites or control sites. Only populations of hispid cotton rats at industrial waste sites and control sites were large enough for comparisons. Overall population numbers, age structure, and body mass of adult male and female cotton rats were similar at industrial waste sites and control sites. Populations of small mammals (particularly hispid cotton rats) may not suffice as indicators of environments with hazardous industrial waste contamination.

  2. Analysis of hydraulic gradients across the host rock at the proposed Texas Panhandle nuclear-waste repository site

    International Nuclear Information System (INIS)

    Bair, E.S.

    1987-01-01

    Analysis of the direction of ground-water flow across the host rock at the proposed high-level nuclear-waste repository site in Deaf Smith County, Texas, is complicated by vertical and lateral changes in the density of formation fluids in the various hydrogeologic units that overlie and underlie the proposed host rock. Because the concept of hydraulic head is not valid when evaluating vertical hydraulic gradients in a variably-density flow system, other methods were used to determine the direction and magnitude of vertical hydraulic gradients at the proposed site where the specific gravity of formation fluids varies between 1.00 and 1.28. The direction of ground-water flow across the proposed host rock, an 80-foot-thick salt bed in the Lower San Andres Formation, was determined by calculating vertical hydraulic gradients based on formation pressure and fluid density data, and by analysis of pressure-depth diagrams. Based on data from the vicinity of the proposed site, both methods indicate the potential for downflow across the host rock. Downflow or predominantly horizontal flow is considered a favorable prewaste emplacement condition because it prolongs the travel time to the biosphere of any naturally or accidentally released radionuclides

  3. Fruiting of browse plants affected by pine site preparation in east Texas

    Science.gov (United States)

    John J. Stransky; Douglas Richardson

    1977-01-01

    Pine planting sites prepared by burning yielded 120 kg/ha of browse fruits the third growing season after site treatment. Control plots yielded 74, KG-bladed plots 57, and chopped plots 41 kg/ha. Blackberries, American beautyberry, sumac, Sebastian bush, muscadine grape, blueberries, and southern wax-myrtle were the principal species. Most fruit was available in summer...

  4. Evaluation of a committed fusion site. Final report

    International Nuclear Information System (INIS)

    1979-07-01

    This report is divided into five technical sections. Section 2 is a summary. In Section 3, which covers device and site analyses the major characteristics of devices that might be placed at the site, as envisioned by major fusion laboratories, are described; the characteristics of a site (baseline site) which would accommodate these devices are defined; and various approaches to a committed site meeting the baseline site requirements are discussed. Section 4 describes the scenarios selected to represent possible site development outcomes; these scenarios are evaluated with respect to comparative cost and schedule effects. Section 5 presents a brief evaluation of the effects fusion-fission hybrids might have on the committed site. Major conclusions and recommendations are discussed in Section 6

  5. Site study plan for EDBH [Engineering Design Boreholes] seismic surveys, Deaf Smith County site, Texas: Revision 1

    International Nuclear Information System (INIS)

    Hume, H.

    1987-12-01

    This site study plan describes seismic reflection surveys to run north-south and east-west across the Deaf Smith County site, and intersecting near the Engineering Design Boreholes (EDBH). Both conventional and shallow high-resolution surveys will be run. The field program has been designed to acquire subsurface geologic and stratigraphic data to address information/data needs resulting from Federal and State regulations and Repository program requirements. The data acquired by the conventional surveys will be common-depth- point, seismic reflection data optimized for reflection events that indicate geologic structure near the repository horizon. The data will also resolve the basement structure and shallow reflection events up to about the top of the evaporite sequence. Field acquisition includes a testing phase to check/select parameters and a production phase. The field data will be subjected immediately to conventional data processing and interpretation to determine if there are any anamolous structural for stratigraphic conditions that could affect the choice of the EDBH sites. After the EDBH's have been drilled and logged, including vertical seismic profiling, the data will be reprocessed and reinterpreted for detailed structural and stratigraphic information to guide shaft development. The shallow high-resulition seismic reflection lines will be run along the same alignments, but the lines will be shorter and limited to immediate vicinity of the EDBH sites. These lines are planned to detect faults or thick channel sands that may be present at the EDBH sites. 23 refs. , 7 figs., 5 tabs

  6. Maternal Mortality in Texas.

    Science.gov (United States)

    Baeva, Sonia; Archer, Natalie P; Ruggiero, Karen; Hall, Manda; Stagg, Julie; Interis, Evelyn Coronado; Vega, Rachelle; Delgado, Evelyn; Hellerstedt, John; Hankins, Gary; Hollier, Lisa M

    2017-05-01

    A commentary on maternal mortality in Texas is provided in response to a 2016 article in Obstetrics & Gynecology by MacDorman et al. While the Texas Department of State Health Services and the Texas Maternal Mortality and Morbidity Task Force agree that maternal mortality increased sharply from 2010 to 2011, the percentage change or the magnitude of the increase in the maternal mortality rate in Texas differs depending on the statistical methods used to compute and display it. Methodologic challenges in identifying maternal death are also discussed, as well as risk factors and causes of maternal death in Texas. Finally, several state efforts currently underway to address maternal mortality in Texas are described. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  7. Public health assessment for Geneva Industries/Fuhrmann Energy, Houston, Harris County, Texas, Region 6. CERCLIS No. TXD980748453. Addendum. Final report

    International Nuclear Information System (INIS)

    1993-01-01

    The Geneva Industries Site is an abandoned refinery in Houston, Texas, that manufactured polychlorinated biphenyls (PCBs). Although there is evidence of past exposure to site contaminants, the site currently poses no apparent public health hazard. The contaminants to which persons may have been exposed in the past include polychlorinated biphenyls (PCBs), polycyclic aromatic hydrocarbons (PAHs), and 2,3,7,8-tetrachlorodibenzo-p-dioxin (TCDD). The lack of historical ambient air data from the time when the site was active prevents us from evaluating the potential for adverse health effects from inhalation exposure. Although fish and crawfish taken from the local drainageways were contaminated with PCBs, it is unlikely that humans would have been exposed to these species through the food chain. The groundwater under the site is contaminated. Although the contaminated water is not currently being used for human consumption, there is a potential for exposure to contaminated groundwater in the future. Planned groundwater remedial actions should eliminate this threat

  8. Operations and Maintenance Manual for Expanded Bioventing System Site FC-2 Kelly AFB, Texas

    National Research Council Canada - National Science Library

    1996-01-01

    This Operations and Maintenance Manual has been created as a guide for monitoring and maintaining the performance of the bioventing blower and vent well plumbing at the Fire Training Area (Site FC-2...

  9. Site Study Plan for meteorology/air quality, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Meteorological/Air Quality Site Study Plan describes a field program consisting of continuous measurements of surface (10-meter) wind speed and direction, temperature, humidity, dew point, pressure, and sensible heat flux (vertical). Air quality measurements will be limited to suspended particulate matter. After the first year of measurements, a 60-meter tower will be added to incorporate measurements needed for later modeling and dose calculations; these will include upper level winds, vertical temperature structure, and vertical wind speed. All of these measurements will be made at a site located within the 9-mi 2 site area but remote from the ESF. A second site, located near and downwind from the ESF, will monitor only particulate matter. The SSP describes the need for each study; its design and design rationale; analysis, management, and use of data, schedule of field activities, organization of field personnel and sample management, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from the Salt Repository Project Requirements Document. 38 refs., 8 figs., 3 tabs

  10. Final Environmental Assessment for the Closure of the Garland ANG Station 254th Combat Communications Group Garland, Texas

    Science.gov (United States)

    2009-07-01

    Rec~ td <if J)ecision (ROD) Final step:in the EIS process. It iS a concise_ public doctunent that sets fNth the.decisioll, identifies the...associated with a site to cnsme Lh<lt 1 111 111 I ui p11i li!l\\’.111 d u lliJ ’·’·’IJI d.u llJ lll iutlut.lL iLtluu li ll ~~.•udu lLJ u JJJLLJ JuguJ i11 u

  11. Impact of the Mexican Alien Commuter on the Apparel Industry of El Paso, Texas--A Case Study. Final Report.

    Science.gov (United States)

    Rungeling, Brian Scott

    This study analyzed what effect commuters had on wage levels, employment, and industrial locations, and the relative importance of the commuter as part of the work force. A questionnaire was administered to 190 workers and to their 20 employers in the apparel industry of El Paso, Texas. The questionnaires revealed that the commuters were paid the…

  12. 77 FR 71344 - Texas: Final Authorization of State-initiated Changes and Incorporation by Reference of State...

    Science.gov (United States)

    2012-11-30

    ... adverse written comment on the codification of the Texas authorized RCRA program by the close of business... Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit...) introductory paragraph 40 CFR 270.42(a)(1) intro. 30 TAC 305.69(b)(1)(A), except for 40 CFR 270.42(a)(1)(i...

  13. 76 FR 13209 - United States and State of Texas v. United Regional Health Care System; Proposed Final Judgment...

    Science.gov (United States)

    2011-03-10

    ... of Texas v. United Regional Health Care System, Civil Action No. 7:11-cv- 00030-O. On February 25..., ambulatory surgery center or radiology center in [a] 15 mile radius of United Regional Health Care System... 95% of billed charges for all inpatient and outpatient services at United Regional Health Care System...

  14. Siting guidelines for utility application of wind turbines. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Pennell, W.T.

    1983-01-01

    Utility-oriented guidelines are described for identifying viable sites for wind turbines. Topics and procedures are also discussed that are important in carrying out a wind turbine siting program. These topics include: a description of the Department of Energy wind resource atlases; procedures for predicting wind turbine performance at potential sites; methods for analyzing wind turbine economics; procedures for estimating installation and maintenance costs; methods for anlayzing the distribution of wind resources over an area; and instrumentation for documenting wind behavior at potential sites. The procedure described is applicable to small and large utilities. Although the procedure was developed as a site-selection tool, it can also be used by a utility who wishes to estimate the potential for wind turbine penetration into its future generation mix.

  15. Site Study Plan for background environmental radioactivity, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Background Environmental Radioactivity Site Study Plan describes a field program consisting of an initial radiological survey and a radiological sampling program. The field program includes measurement of direct radiation and collection and analysis of background radioactivity samples of air, precipitation, soil, water, milk, pasture grass, food crops, meat, poultry, game, and eggs. The plan describes for each study: the need for the study, the study design, data management and use, schedule of proposed activities, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project (SRP) Requirements Document. 50 refs., 11 figs., 7 tabs

  16. Site study plan for Exploratory shaft facilities design foundation boreholes (shaft surface facility foundation borings), Deaf Smith County Site, Texas: Surface-based geotechnical field program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-12-01

    This site study plan describes the Exploratory Shaft Facilities (ESF) Design Foundation Boreholes field activities to be conducted during early stages of Site Characterization at the Deaf Smith County, Texas, site. The field program has been designed to provide data useful in addressing information/data needs resulting from federal/state/local regulations, and repository program requirements. Approximately 50 foundation boreholes will be drilled within the ESP location to provide data necessary for design of the ESF and to satisfy applicable shaft permitting requirements. Soils and subsurface rock will be sampled as the foundation boreholes are advanced. Soil samples or rock core will be taken through the Blackwater Draw and Ogallala Formations and the Dockum Group. Hydrologic testing will be performed in boreholes that penetrates the water table. In-situ elastic properties will be determined from both the soil strata and rock units along the length of the boreholes. Field methods/tests are chosen that provide the best or only means of obtaining the required data. The Salt Repository Project (SRP) Networks specify the schedule under which the program will operate. Drilling will not begin until after site ground water baseline conditions have been established. The Technical Field Services Contractor is responsible for conducting the field program of drilling and testing. Samples and data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that the appropriate documentation is maintained. 25 refs., 10 figs., 6 tabs

  17. Surface-based test plan, Deaf Smith County, Texas Site: Draft

    International Nuclear Information System (INIS)

    1985-01-01

    The Surface-Based Test Plan (SBTP) is the plan which accounts for all surface-based site field work to be conducted at the Permian salt site selected for characterization. The SBTP relates data needs from program requirement documents and presents plans to satisfy the data needs. The SBTP excludes plans for construction of the Exploratory Shaft Facility (ESF) and plans for the in situ testing. The SBTP is a hierarchical plan stemming from the Technical Program Plan. The SBTP describes in detail the process by which surface-based study plans are defined, developed, and controlled. The plans hierarchy extends downward thru subordinate Site Study Plans (SSPs), which describe in detail elements of field work to be done, to detailed Procedures which document the exact methodologies to be employed in the conduct of field work. The plan is a QA level S document, although some of its elements are at lower QA levels. The plan is a controlled document, and any proposed amendments to the plan or subordinate documents can only be implemented through the specified change control procedure

  18. Remedial action selection report Maybell, Colorado, site. Final report

    International Nuclear Information System (INIS)

    1996-12-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The site is 2.5 mi (4 km) northeast of the Yampa River on relatively flat terrain broken by low, flat-topped mesas. U.S. Highway 40 runs east-west 2 mi (3.2 km) south of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. The site is situated between Johnson Wash to the east and Rob Pit Mine to the west. Numerous reclaimed and unreclaimed mines are in the immediate vicinity. Aerial photographs (included at the end of this executive summary) show evidence of mining activity around the Maybell site. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [ml]) and contains 2.8 million cubic yards (yd 3 ) (2.1 million cubic meters [m 3 ]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd 3 (15,000 m 3 ) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd 3 (420,000 m 3 ). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd 3 (2.58 million m 3 )

  19. Assessment of trace ground-water contaminants release from south Texas in-situ uranium solution-mining sites

    Energy Technology Data Exchange (ETDEWEB)

    Kidwell, J.R.; Humenick, M.J.

    1981-01-01

    The future of uranium solution mining in south Texas depends heavily on the industry's ability to restore production zone ground water to acceptable standards. This study investigated the extent of trace contaminant solubilization during mining and subsequent restoration attempts, first through a literature search centered on uranium control mechanisms, and then by laboratory experiments simulating the mining process. The literature search indicated the complexity of the situation. The number of possible interactions between indigenous elements and materials pointed on the site specificity of the problem. The column studies evaluated three different production area ores. Uranium, molybdenum, arsenic, vanadium, and selenium were analyzed in column effluents. After simulated mining operations were completed, uranium was found to be the most persistent trace element. However, subsequent ground water flushing of the columns could restore in-situ water to EPA recommended drinking water concentrations. Limited data indicated that ground water flowing through mined areas may solubilize molybdenum present in down gradient areas adjacent to the production zone due to increased oxidation potential of ground water if adequate restoration procedures are not followed.

  20. The social and special effects of siting a low-level radioactive waste disposal facility in rural Texas

    International Nuclear Information System (INIS)

    Murdock, S.H.; Hamm, R.R.

    1987-01-01

    As part of its assessment of the impacts of a low-level radioactive waste disposal facility in Hudspeth County, the Texas Low-Level Radioactive Waste Disposal Authority (TLLRWDA) sponsored an independent study of the social and special impacts of the facility. These impacts include ''standard'' social impacts (such as impacts on social structures and attitudes, values and perceptions and ''special'' social impacts (such as fear, anxiety, concerns related to equity, the health of future generations, etc.). This paper reports the results of this study. Personal interviews with 71 community leaders and 96 randomly selected county residents were conducted during the summer of 1986. The results suggest that the major concern relates to the contamination of ground water, but that suspicion about the equity of the siting process and about the safe management of wastes is extensive, even among the most knowledgeable respondents. Mitigation concerns center on health and safety issues for residents and on potential forms of mitigation for governmental jurisdictions for leaders. Responses were similar for leaders and residents and for persons in different parts of the county

  1. Nevada Test Site, Nye County, Nevada. Final environmental impact statement

    International Nuclear Information System (INIS)

    1977-09-01

    This environmental statement for the Nevada Test Site (NTS) considers underground nuclear detonations with yields of one megaton or less, along with the preparations necessary for such detonations. The testing activities considered also include other continuing and intermittent activities, both nuclear and nonnuclear, which can best be conducted in the remote and controlled area of the Nevada Test Site. These activities are listed, with emphasis on weapons testing programs which do not remain static

  2. Nevada Test Site, Nye County, Nevada. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-09-01

    This environmental statement for the Nevada Test Site (NTS) considers underground nuclear detonations with yields of one megaton or less, along with the preparations necessary for such detonations. The testing activities considered also include other continuing and intermittent activities, both nuclear and nonnuclear, which can best be conducted in the remote and controlled area of the Nevada Test Site. These activities are listed, with emphasis on weapons testing programs which do not remain static.

  3. Compliance status summaries for federal and state statutory directives that apply to the Salt Repository Project at the Deaf Smith County Site, Texas

    International Nuclear Information System (INIS)

    1986-07-01

    This document contains statutory summaries, checklists of compliance requirements, status summaries, and lists of information needs for the environmental and health and safety statutory directives at Federal and State levels that apply to the Salt Repository Project at the Deaf Smith County Site, Texas. Statutes that apply in general to any repository project but not specifically to the Deaf Smith are not included. The information herein supplements the Salt Repository Project Statutory Compliance Plan and the Salt Repository Project Permitting Management Plan by providing lengthy details on statutory directives, compliance requirements, information needs, and the overall status of the environmental and health and safety compliance program for the Salt Repository Project at the Deaf Smith County Site, Texas

  4. 76 FR 12283 - Texas: Final Authorization of State-initiated Changes and Incorporation by Reference of State...

    Science.gov (United States)

    2011-03-07

    ... written comment on the codification of the Texas authorized RCRA program by the close of business April 6.... 30 TAC 305.45(a)(8) intro.--(a)(8)(B).. 40 CFR 270.13(l) related. 30 TAC 305.50(a)(6) 40 CFR 270.17(b.... The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory...

  5. Energy conserving site design case study: Shenandoah, Georgia. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    The case study examines the means by which energy conservation can be achieved at an aggregate community level by using proper planning and analytical techniques for a new town, Shenandoah, Georgia, located twenty-five miles southwest of Atlanta's Hartsfield International Airport. A potentially implementable energy conservation community plan is achieved by a study team examining the land use options, siting characteristics of each building type, alternate infrastructure plans, possible decentralized energy options, and central utility schemes to determine how community energy conservation can be achieved by use of pre-construction planning. The concept for the development of mixed land uses as a passively sited, energy conserving community is based on a plan (Level 1 Plan) that uses the natural site characteristics, maximizes on passive energy siting requirement, and allows flexibility for the changing needs of the developers. The Level 2 Plan is identical with Level 1 plan plus a series of decentraized systems that have been added to the residential units: the single-family detached, the apartments, and the townhouses. Level 3 Plan is similar to the Level 1 Plan except that higher density dwellings have been moved to areas adjacent to central site. The total energy savings for each plan relative to the conventional plan are indicated. (MCW)

  6. Perchlorate in fish from a contaminated site in east-central Texas.

    Science.gov (United States)

    Theodorakis, Christopher; Rinchard, Jacques; Anderson, Todd; Liu, Fujun; Park, June-Woo; Costa, Filipe; McDaniel, Leslie; Kendall, Ronald; Waters, Aaron

    2006-01-01

    Perchlorate, a known thyroid endocrine disruptor, contaminates surface waters near military instillations where solid fuel rocket motors are manufactured or assembled. To assess potential perchlorate exposure to fish and the human population which may feed on them, fish were collected around the Naval Weapons Industrial Reserve Plant in McLennan County, TX, and analyzed for the presence of the perchlorate anion. The sampling sites included Lake Waco and Belton Lake, and several streams and rivers within their watersheds. The general tendency was that perchlorate was only found in a few species sampled, and perchlorate was not detected in every individual within these species. When detected in the fish, perchlorate tissue concentrations were greater than that in the water. This may be due to highly variable perchlorate concentrations in the water coupled with individual-level variation in elimination from the body, or to routes of exposure other than water.

  7. Repository site data and information in bedded salt: Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Tien, P.; Nimick, F.B.; Muller, A.B.; Davis, P.A.; Guzowski, R.V.; Duda, L.E.; Hunter, R.L.

    1983-11-01

    This report is a compilation of data from the literature on the Palo Duro Basin. The Palo Duro Basin is a structural basin, about 150 miles long and 80 miles wide, that is a part of the much larger Permian Basin. The US Department of Energy is investigating the Palo Duro Basin as a potentially suitable area for the site of a repository for the disposal of high-level radioactive waste. Sediments overlying the Precambrian basement range from about 5000 to about 11,000 ft in thickness and from Cambrian to Holocene in age. The strata in the Palo Duro Basin that are of primary interest to the Department of Energy are the bedded salts of the Permian San Andres Formation. The total thickness of the bedded salts is about 2000 ft. The geology of the Palo Duro Basin is well understood. A great deal of information exists on the properties of salt, although much of the available information was not collected in the Palo Duro Basin. Mineral resources are not currently being exploited from the center of the Palo Duro Basin at depth, although the possibility of exploration for and development of such resources can not be ruled out. The continued existence of salts of Permian age indicates a lack of any large amount of circulating ground water. The hydrology of the pre-Tertiary rocks, however, is currently too poorly understood to carry out detailed, site-specific hydrologic modeling with a high degree of confidence. In general, ground water flows from west to east in the Basin. There is little or no hydraulic connection between aquifers above and below the salt sequences. Potable water is pumped from the Ogallala aquifer. Most of the other aquifers yield only nonpotable water. More extensive hydrological data are needed for detailed future modeling in support of risk assessment for a possible repository for high-level waste in the Palo Duro Basin. 464 references

  8. Underground facility for geoenvironmental and geotechnical research at the SSC Site in Texas

    International Nuclear Information System (INIS)

    Wang, H.F.; Myer, L.R.

    1994-01-01

    The subsurface environment is an important national resource that is utilized for construction, waste disposal and groundwater supply. Conflicting and unwise use has led to problems of groundwater contamination. Cleanup is often difficult and expensive, and perhaps not even possible in many cases. Construction projects often encounter unanticipated difficulties that increase expenses. Many of the difficulties of predicting mechanical behavior and fluid flow and transport behavior stem from problems in characterizing what cannot be seen. An underground research laboratory, such as can be developed in the nearly 14 miles of tunnel at the Superconducting Super Collider (SSC) site, will provide a unique opportunity to advance scientific investigations of fluid flow, chemical transport, and mechanical behavior in situ in weak and fractured, porous rock on a scale relevant to civil and environmental engineering applications involving the subsurface down to a depth of 100 m. The unique element provided by underground studies at the SSC site is three-dimensional access to a range of fracture conditions in two rock types, chalk and shale. Detailed experimentation can be carried out in small sections of the SSC tunnel where different types of fractures and faults occur and where different rock types or contacts are exposed. The entire length of the tunnel can serve as an observatory for large scale mechanical and fluid flow testing. The most exciting opportunity is to mine back a volume of rock to conduct a post-experiment audit following injection of a number of reactive and conservative tracers. Flow paths and tracer distributions can be examined directly. The scientific goal is to test conceptual models and numerical predictions. In addition, mechanical and hydrological data may be of significant value in developing safe and effective methods for closing the tunnel itself

  9. Final storage site for radioactive waste. Gorleben mine

    International Nuclear Information System (INIS)

    1995-02-01

    Out of more than 20 salt stocks, the Gorleben salt stock was chosen. In addition to the preliminary information available on its size and depth, detailed exploratory investigations were carried out in order to test its suitability as a site for ultimate storage of all types of radioactive waste. (orig.) [de

  10. Perchlorate in fish from a contaminated site in east-central Texas

    International Nuclear Information System (INIS)

    Theodorakis, Christopher; Rinchard, Jacques; Anderson, Todd; Liu, Fujun; Park, June-Woo; Costa, Filipe; McDaniel, Leslie; Kendall, Ronald; Waters, Aaron

    2006-01-01

    Perchlorate, a known thyroid endocrine disruptor, contaminates surface waters near military instillations where solid fuel rocket motors are manufactured or assembled. To assess potential perchlorate exposure to fish and the human population which may feed on them, fish were collected around the Naval Weapons Industrial Reserve Plant in McLennan County, TX, and analyzed for the presence of the perchlorate anion. The sampling sites included Lake Waco and Belton Lake, and several streams and rivers within their watersheds. The general tendency was that perchlorate was only found in a few species sampled, and perchlorate was not detected in every individual within these species. When detected in the fish, perchlorate tissue concentrations were greater than that in the water. This may be due to highly variable perchlorate concentrations in the water coupled with individual-level variation in elimination from the body, or to routes of exposure other than water. - In perchlorate-contaminated lakes and streams, perchlorate is detected infrequently in fish heads, fillets, and whole bodies, but may be detected more often depending on species and seasonal trends, and always at concentrations higher in the fish than in the water

  11. Strategic Petroleum Reserve (SPR) additional geologic site characterization studies, Bryan Mound Salt Dome, Texas

    Energy Technology Data Exchange (ETDEWEB)

    Neal, J.T. [Sandia National Labs., Albuquerque, NM (United States); Magorian, T.R.; Ahmad, S. [Acres International Corp., Amherst, NY (United States)

    1994-11-01

    This report revises the original report that was published in 1980. Some of the topics covered in the earlier report were provisional and it is now practicable to reexamine them using new or revised geotechnical data and that obtained from SPR cavern operations, which involves 16 new caverns. Revised structure maps and sections show interpretative differences as compared with the 1980 report and more definition in the dome shape and caprock structural contours, especially a major southeast-northwest trending anomalous zone. The original interpretation was of westward tilt of the dome, this revision shows a tilt to the southeast, consistent with other gravity and seismic data. This interpretation refines the evaluation of additional cavern space, by adding more salt buffer and allowing several more caverns. Additional storage space is constrained on this nearly full dome because of low-lying peripheral wetlands, but 60 MMBBL or more of additional volume could be gained in six or more new caverns. Subsidence values at Bryan Mound are among the lowest in the SPR system, averaging about 11 mm/yr (0.4 in/yr), but measurement and interpretation issues persist, as observed values are about the same as survey measurement accuracy. Periodic flooding is a continuing threat because of the coastal proximity and because peripheral portions of the site are at elevations less than 15 ft. This threat may increase slightly as future subsidence lowers the surface, but the amount is apt to be small. Caprock integrity may be affected by structural features, especially the faulting associated with anomalous zones. Injection wells have not been used extensively at Bryan Mound, but could be a practicable solution to future brine disposal needs. Environmental issues center on the areas of low elevation that are below 15 feet above mean sea level: the coastal proximity and lowland environment combined with the potential for flooding create conditions that require continuing surveillance.

  12. Active sites in char gasification: Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    Wojtowicz, M.; Lilly, W.D.; Perkins, M.T.; Hradil, G.; Calo, J.M.; Suuberg, E.M.

    1987-09-01

    Among the key variables in the design of gasifiers and combustors is the reactivity of the chars which must be gasified or combusted. Significant loss of unburned char is unacceptable in virtually any process; the provision of sufficient residence time for complete conversion is essential. A very wide range of reactivities are observed, depending upon the nature of the char in a process. The current work focuses on furthering the understanding of gasification reactivities of chars. It has been well established that the reactivity of char to gasification generally depends upon three principal factors: (1) the concentration of ''active sites'' in the char; (2) mass transfer within the char; and (3) the type and concentration of catalytic impurities in the char. The present study primarily addresses the first factor. The subject of this research is the origin, nature, and fate of active sites in chars derived from parent hydrocarbons with coal-like structure. The nature and number of the active sites and their reactivity towards oxygen are examined in ''model'' chars derived from phenol-formaldehyde type resins. How the active sites are lost by the process of thermal annealing during heat treatment of chars are studied, and actual rate for the annealing process is derived. Since intrinsic char reactivities are of primary interest in the present study, a fair amount of attention was given to the model char synthesis and handling so that the effect of catalytic impurities and oxygen-containing functional groups in the chemical structure of the material were minimized, if not completely eliminated. The project would not be considered complete without comparing characteristic features of synthetic chars with kinetic behavior exhibited by natural chars, including coal chars.

  13. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    2000-01-01

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility

  14. Continuous and discrete water-quality data collected at five sites on Lake Houston near Houston, Texas, 2006-08

    Science.gov (United States)

    Beussink, Amy M.; Burnich, Michael R.

    2009-01-01

    Lake Houston, a reservoir impounded in 1954 by the City of Houston, Texas, is a primary source of drinking water for Houston and surrounding areas. The U.S. Geological Survey, in cooperation with the City of Houston, developed a continuous water-quality monitoring network to track daily changes in water quality in the southwestern quadrant of Lake Houston beginning in 2006. Continuous water-quality data (the physiochemical properties water temperature, specific conductance, pH, dissolved oxygen concentration, and turbidity) were collected from Lake Houston to characterize the in-lake processes that affect water quality. Continuous data were collected hourly from mobile, multi-depth monitoring stations developed and constructed by the U.S. Geological Survey. Multi-depth monitoring stations were installed at five sites in three general locations in the southwestern quadrant of the lake. Discrete water-quality data (samples) were collected routinely (once or twice each month) at all sites to characterize the chemical and biological (phytoplankton and bacteria) response to changes in the continuous water-quality properties. Physiochemical properties (the five continuously monitored plus transparency) were measured in the field when samples were collected. In addition to the routine samples, discrete water-quality samples were collected synoptically (one or two times during the study period) at all sites to determine the presence and levels of selected constituents not analyzed in routine samples. Routine samples were measured or analyzed for acid neutralizing capacity; selected major ions and trace elements (calcium, silica, and manganese); nutrients (filtered and total ammonia nitrogen, filtered nitrate plus nitrite nitrogen, total nitrate nitrogen, filtered and total nitrite nitrogen, filtered and total orthophosphate phosphorus, total phosphorus, total nitrogen, total organic carbon); fecal indicator bacteria (total coliform and Escherichia coli); sediment

  15. Geologic framework and hydrogeologic features of the Glen Rose Limestone, Camp Bullis Training Site, Bexar County, Texas

    Science.gov (United States)

    Clark, Allan K.

    2003-01-01

    The Glen Rose Limestone crops out over most of the Camp Bullis Training Site in northern Bexar County, Texas, where it consists of upper and lower members and composes the upper zone and the upper part of the middle zone of the Trinity aquifer. Uncharacteristically permeable in northern Bexar County, the Glen Rose Limestone can provide avenues for recharge to and potential contamination of the downgradient Edwards aquifer, which occupies the southeastern corner of Camp Bullis.The upper member of the Glen Rose Limestone characteristically is thin-bedded and composed mostly of soft limestone and marl, and the lower Glen Rose typically is composed mostly of relatively massive, fossiliferous limestone. The upper member, about 410 to 450 feet thick at Camp Bullis, was divided in this study into five hydrogeologic subdivisions, A through E (youngest to oldest).The approximately 120-foot-thick Interval A has an abundance of caves, which is indicative of its generally well developed fracture, channel, and cavern porosity that in places provides appreciable permeability. The 120- to 150-foot-thick Interval B is similar to Interval A but with less cave development and considerably less permeability. The 10- to 20-foot-thick Interval C, a layer of partly to mostly dissolved soluble carbonate minerals, is characterized by breccia porosity, boxwork permeability, and collapse structures that typically divert ground water laterally to discharge at land surface. The 135- to 180-foot-thick Interval D generally has low porosity and little permeability with some local exceptions, most notably the caprinid biostrome just below the top of the interval, which appears to be permeable by virtue of excellent moldic, vug, fracture, and cavern porosity. The 10- to 20-foot-thick Interval E, a layer of partly to mostly dissolved evaporites similar to Interval C, has similar hydrogeologic properties and a tendency to divert ground water laterally.

  16. Avian radioecology on a nuclear power station site. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Levy, C.K.; Maletskos, C.J.; Youngstrom, K.A.

    1975-01-01

    A summary of a six-year avian radioecology study at the site of a nuclear power plant in Massachusetts is reported. A completed historical summary is followed by a description of mathematical models developed to calculate the effects on bird body burdens of various changes in environmental radionuclide levels. Examples are presented. Radionuclide metabolism studies in which acute doses of /sup 131/I and /sup 137/Cs were administered to four species of wild birds are presented. Radionuclides were administered both intravenously and orally; no apparent differences in uptake or elimination rates were observed between the two methods.

  17. Avian radioecology on a nuclear power station site. Final report

    International Nuclear Information System (INIS)

    Levy, C.K.; Maletskos, C.J.; Youngstrom, K.A.

    1975-01-01

    A summary of a six-year avian radioecology study at the site of a nuclear power plant in Massachusetts is reported. A completed historical summary is followed by a description of mathematical models developed to calculate the effects on bird body burdens of various changes in environmental radionuclide levels. Examples are presented. Radionuclide metabolism studies in which acute doses of 131 I and 137 Cs were administered to four species of wild birds are presented. Radionuclides were administered both intravenously and orally; no apparent differences in uptake or elimination rates were observed between the two methods

  18. Basalt Waste Isolation Project exploratory shaft site: Final reclamation report

    International Nuclear Information System (INIS)

    Brandt, C.A.; Rickard, W.H. Jr.

    1990-06-01

    The restoration of areas disturbed by activities of the Basalt Waste Isolation Project (BWIP) constitutes a unique operation at the US Department of Energy's (DOE) Hanford Site, both from the standpoint of restoration objectives and the time frame for accomplishing these objectives. The BWIP reclamation program comprises three separate projects: borehole reclamation, Near Surface Test Facility (NSTF) reclamation, and Exploratory Shaft Facility (ESF) reclamation. The main focus of this report is on determining the success of the revegetation effort 1 year after work was completed. This report also provides a brief overview of the ESF reclamation program. 21 refs., 7 figs., 14 tabs

  19. Geology and recognition criteria for sandstone uranium deposits in mixed fluvial-shallow marine sedimentary sequences, South Texas. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.S.; Smith, R.B.

    1981-01-01

    Uranium deposits in the South Texas Uranium Region are classical roll-type deposits that formed at the margin of tongues of altered sandstone by the encroachment of oxidizing, uraniferous solutions into reduced aquifers containing pyrite and, in a few cases, carbonaceous plant material. Many of the uranium deposits in South Texas are dissimilar from the roll fronts of the Wyoming basins. The host sands for many of the deposits contain essentially no carbonaceous plant material, only abundant disseminated pyrite. Many of the deposits do not occur at the margin of altered (ferric oxide-bearing) sandstone tongues but rather occur entirely within reduced, pyurite-bearing sandstone. The abundance of pyrite within the sands probably reflects the introduction of H/sub 2/S up along faults from hydrocarbon accumulations at depth. Such introductions before ore formation prepared the sands for roll-front development, whereas post-ore introductions produced re-reduction of portions of the altered tongue, leaving the deposit suspended in reduced sandstone. Evidence from three deposits suggests that ore formation was not accompanied by the introduction of significant amounts of H/sub 2/S.

  20. Geology and recognition criteria for sandstone uranium deposits in mixed fluvial-shallow marine sedimentary sequences, South Texas. Final report

    International Nuclear Information System (INIS)

    Adams, S.S.; Smith, R.B.

    1981-01-01

    Uranium deposits in the South Texas Uranium Region are classical roll-type deposits that formed at the margin of tongues of altered sandstone by the encroachment of oxidizing, uraniferous solutions into reduced aquifers containing pyrite and, in a few cases, carbonaceous plant material. Many of the uranium deposits in South Texas are dissimilar from the roll fronts of the Wyoming basins. The host sands for many of the deposits contain essentially no carbonaceous plant material, only abundant disseminated pyrite. Many of the deposits do not occur at the margin of altered (ferric oxide-bearing) sandstone tongues but rather occur entirely within reduced, pyurite-bearing sandstone. The abundance of pyrite within the sands probably reflects the introduction of H 2 S up along faults from hydrocarbon accumulations at depth. Such introductions before ore formation prepared the sands for roll-front development, whereas post-ore introductions produced re-reduction of portions of the altered tongue, leaving the deposit suspended in reduced sandstone. Evidence from three deposits suggests that ore formation was not accompanied by the introduction of significant amounts of H 2 S

  1. Savannah River Site waste management. Final environmental impact statement - addendum

    International Nuclear Information System (INIS)

    1995-07-01

    The purpose of this environmental impact statement is to help DOE decide how to manage over the next 30 years liquid high-level radioactive, low-level radioactive, mixed, hazardous, and transuranic wastes generated during 40 years of past operations and on-going activities (including management of wastes received from offsite) at Savannah River Site (SRS) in southwestern South Carolina. The wastes are currently stored at SRS. DOE seeks to dispose of the wastes in a cost-effective manner that protects human health and the environment. In this document, DOE assesses the cumulative environmental impacts of storing, treating, and disposing of the wastes, examines the impacts of alternatives, and identifies measures available to reduce adverse impacts. Evaluations of impacts on water quality, air quality, ecological systems, land use, geologic resources, cultural resources, socio-economics, and the health and safety of onsite workers and the public are included in the assessment

  2. Savannah River Site Waste Management Final Environmental Impact Statement Addendum

    International Nuclear Information System (INIS)

    1995-07-01

    The purpose of this environmental impact statement is to help DOE decide how to manage over the next 30 years liquid high-level radioactive, low-level radioactive, mixed, hazardous, and transuranic wastes generated during 40 years of past operations and on-going activities (including management of wastes received from offsite) at Savannah River Site (SRS) in southwestern South Carolina. The wastes are currently stored at SRS. DOE seeks to dispose of the wastes in a cost-effective manner that protects human health and the environment. In this document, DOE assesses the cumulative environmental impacts of storing, treating, and disposing of the wastes, examines the impacts of alternatives, and identifies measures available to reduce adverse impacts. Evaluations of impacts on water quality, air quality, ecological systems, land use, geologic resources, cultural resources, socio-economic, and the health and safety of onsite workers and the public are included in the assessment

  3. [Paleoclimatology studies for Yucca Mountain site characterization]. Final report

    International Nuclear Information System (INIS)

    1996-01-01

    This report consists of two separate papers: Fernley Basin studies; and Influence of sediment supply and climate change on late Quaternary eolian accumulation patterns in the Mojave Desert. The first study involved geologic mapping of late Quaternary sediments and lacustrine features combined with precise control of elevations and descriptions of sediments for each of the major sedimentary units. The second paper documents the response of a major eolian sediment transport system in the east-central Mojave Desert: that which feeds the Kelso Dune field. Information from geomorphic, stratigraphic, and sedimentologic studies of eolian deposits and landforms is combined with luminescence dating of these deposits to develop a chronology of periods of eolian deposition. Both studies are related to site characterization studies of Yucca Mountain and the forecasting of rainfall patterns possible for the high-level radioactive waste repository lifetime

  4. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2012-07-15

    In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining

  5. Hydrogen production from small hyropower sites. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-04-01

    A synergistic relationship was not found to exist between low-head hydropower and electrolytic hydrogen production. The storageability of hydrogen was expected to mitigate problems of hydrogen generation variability associated with the use of low-head hydropower as the power source. The expense of gaseous hydrogen storage equipment effectively eliminates storage as a means to decouple hydrogen demand and power/hydrogen production. From the opposite perspective, the availability of a low and stable cost of power from low-head hydro was expected to improve the competitiveness of electrolysis. In actuality, the results indicated that hydroelectric power from small dams would be comparatively expensive by current grid power standards (mid-1979). Electrolysis, in the capacity range considered here, is less sensitive to the cost of the power than originally presumed. Other costs including depreciation and capital related charges are more significant. Due to power generation variability, sole reliance on low-head hydropower to provide electricity to the cells would reduce the utilization of the hydrogen production investment, resulting in an increase in unit production costs. These factors were paramount in the Air Products recommendation to discontinue the study before continuing to more detailed stages of analysis, including an analysis of a site specific facility and the construction of a demonstration facility. Another major factor was the unavailability of a pipeline hydrogen supply situation which, because of lower distribution and capital costs, could have been commercially viable. An unfavorable judgment on the combined facility should not be misinterpreted and extended to the component systems. Although a detailed analysis of the individual prospects for electrolysis and low-head hydropower was beyond the study scope, the reader will realize, as the study is reviewed, that each is worthy of individual consideration.

  6. Remote experimental site concept development, LDRD final report

    International Nuclear Information System (INIS)

    Casper, T.A.; Meyer, W.; Butner, D.

    1995-01-01

    Scientific research is now often conducted on large and expensive experiments that utilize collaborative efforts on a national or international scale to explore physics and engineering issues. This is particularly true for the current US magnetic fusion energy program where collaboration on existing facilities has increased in importance and will form the basis for future efforts. As fusion energy research approaches reactor conditions, the trend is towards fewer large and expensive experimental facilities, leaving many major institutions without local experiments. Since the expertise of various groups is a valuable resource, it is important to integrate these teams into an overall scientific program. To sustain continued involvement in experiments, scientists are now often required to travel frequently, or to move their families, to the new large facilities. This problem is common to many other different fields of scientific research. The next-generation tokamaks, such as the Tokamak Physics Experiment (TPX) or the International Thermonuclear Experimental Reactor (ITER), will operate in steady-state or long pulse mode and produce fluxes of fusion reaction products sufficient to activate the surrounding structures. As a direct consequence, remote operation requiring robotics and video monitoring will become necessary, with only brief and limited access to the vessel area allowed. Even the on-site control room, data acquisition facilities, and work areas will be remotely located from the experiment, isolated by large biological barriers, and connected with fiber-optics. Current planning for the ITER experiment includes a network of control room facilities to be located in the countries of the four major international partners; USA, Russian Federation, Japan, and the European Community

  7. West Texas geothermal resource assessment. Part II. Preliminary utilization assessment of the Trans-Pecos geothermal resource. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Gilliland, M.W.; Fenner, L.B.

    1980-01-01

    The utilization potential of geothermal resources in Trans-Pecos, Texas was assessed. The potential for both direct use and electric power generation were examined. As with the resource assessment work, the focus was on the Hueco Tanks area in northeastern El Paso County and the Presidio Bolson area in Presidio County. Suitable users of the Hueco Tanks and Presidio Bolson resource areas were identified by matching postulated temperature characteristics of the geothermal resource to the need characteristics of existing users in each resource area. The amount of geothermal energy required and the amount of fossil fuel that geothermal energy would replace were calculated for each of the users identified as suitable. Current data indicate that temperatures in the Hueco Tanks resource area are not high enough for electric power generation, but in at least part of the Presidio Bolson resource area, they may be high enough for electric power generation.

  8. Final report : Hanover environmental site investigation, 2009-2010.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2011-06-07

    associated with potential exposure to contaminated groundwater at Hanover. No drinking water wells are known to exist in Hanover, and the drinking water supply comes from RWD No.1 at Lanham, Kansas, located 6.5 mi north of Hanover. Limited potential risk was identified due to exposure to indoor air contaminated with carbon tetrachloride, but this risk has been mitigated, thereby removing this threat to human health. Radon is prevalent in the community, at concentrations exceeding the level at which the EPA recommends additional measures (testing and/or mitigation). The recommended testing and mitigation (if needed) are the responsibility of the homeowners. In the current condition in which no private wells are used for drinking water in the affected area, no unacceptable human health risk from carbon tetrachloride is associated with the identified impacted media at the Hanover site.

  9. Power plant site evaluation - Douglas Point site. Volume 1, part 2. Final report

    International Nuclear Information System (INIS)

    1977-11-01

    This is part of a series of reports containing an evaluation of the proposed Douglas Point nuclear generating station site located on the Potomac River in Maryland 30 miles south of Washington, DC. This report contains sections on cooling tower air emissions, noise impacts, transmission line effects, radiation from normal releases, site features affecting radiological accidents, and meteorology

  10. Sustainable Approach for Landfill Management at Final Processing Site Cikundul in Sukabumi City, Indonesia

    OpenAIRE

    Sri Darwati

    2012-01-01

    The main problem of landfill management in Indonesia is the difficulty in getting a location for Final Processing Sites (FPS) due to limited land and high land prices. Besides, about 95% of existing landfills are uncontrolled dumping sites, which could potentially lead to water, soil and air pollution. Based on data from the Ministry of Environment (2010), The Act of the Republic of Indonesia Number 18 Year 2008 Concerning Solid Waste Management, prohibits open dumping at final processing sit...

  11. Hydraulic Testing of Salado Formation Evaporites at the Waste Isolation Pilot Plant Site: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Beauheim, Richard L.; Domski, Paul S.; Roberts, Randall M.

    1999-07-01

    This report presents interpretations of hydraulic tests conducted in bedded evaporates of the Salado Formation from May 1992 through May 1995 at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico. The WIPP is a US Department of Energy research and development facility designed to demonstrate safe disposal of transuranic wastes from the nation's defense programs. The WIPP disposal horizon is located in the lower portion of the Permian Salado Formation. The hydraulic tests discussed in this report were performed in the WIPP underground facility by INTERA inc. (now Duke Engineering and Services, Inc.), Austin, Texas, following the Field Operations Plan and Addendum prepared by Saulnier (1988, 1991 ) under the technical direction of Sandia National Laboratories, Albuquerque, New Mexico.

  12. Hydraulic Testing of Salado Formation Evaporites at the Waste Isolation Pilot Plant Site: Final Report

    International Nuclear Information System (INIS)

    Beauheim, Richard L.; Domski, Paul S.; Roberts, Randall M.

    1999-01-01

    This report presents interpretations of hydraulic tests conducted in bedded evaporates of the Salado Formation from May 1992 through May 1995 at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico. The WIPP is a US Department of Energy research and development facility designed to demonstrate safe disposal of transuranic wastes from the nation's defense programs. The WIPP disposal horizon is located in the lower portion of the Permian Salado Formation. The hydraulic tests discussed in this report were performed in the WIPP underground facility by INTERA inc. (now Duke Engineering and Services, Inc.), Austin, Texas, following the Field Operations Plan and Addendum prepared by Saulnier (1988, 1991 ) under the technical direction of Sandia National Laboratories, Albuquerque, New Mexico

  13. Implementation of advanced LCNG fueling infrastructure in Texas along the I-35/NAFTA Clean Corridor Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, Stan; Hightower, Jared; Knight, Koby

    2001-05-01

    This report documents the process of planning, siting, and permitting recent LCNG station projects; identifying existing constraints in these processes, and recommendations for improvements; LCNG operating history.

  14. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Science.gov (United States)

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  15. Power plant site evaluation, electric energy demand forecasts - Douglas Point Site. Volume 3. Final report

    International Nuclear Information System (INIS)

    Wilson, J.W.

    1975-07-01

    This is part of a series of reports containing an evaluation of the proposed Douglas Point nuclear generating station site located on the Potomac River in Maryland 30 miles south of Washington, D.C. This report contains chapters on the Potomac Electric Power Company's market, forecasting future demand, modelling, a residential demand model, a nonresidential demand model, the Southern Maryland Electric Cooperative Model, short term predictive accuracy, and total system requirements

  16. Application of in situ measurement for site remediation and final status survey of decommissioning KRR site

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sang Bum; Nam, Jong Soo; Choi, Yong Suk; Seo, Bum Kyoung; Moon, Jei Kwon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-06-15

    In situ gamma spectrometry has been used to measure environmental radiation, assumptions are usually made about the depth distribution of the radionuclides of interest in the soil. The main limitation of in situ gamma spectrometry lies in determining the depth distribution of radionuclides. The objective of this study is to develop a method for subsurface characterization by in situ measurement. The peak to valley method based on the ratio of counting rate between the photoelectric peak and Compton region was applied to identify the depth distribution. The peak to valley method could be applied to establish the relation between the spectrally derived coefficients (Q) with relaxation mass per unit area (β) for various depth distribution in soil. The in situ measurement results were verified by MCNP simulation and calculated correlation equation. In order to compare the depth distributions and contamination levels in decommissioning KRR site, in situ measurement and sampling results were compared. The in situ measurement results and MCNP simulation results show a good correlation for laboratory measurement. The simulation relationship between Q and source burial for the source layers have exponential relationship for a variety depth distributions. We applied the peak to valley method to contaminated decommissioning KRR site to determine a depth distribution and initial activity without sampling. The observed results has a good correlation, relative error between in situ measurement with sampling result is around 7% for depth distribution and 4% for initial activity. In this study, the vertical activity distribution and initial activity of {sup 137}Cs could be identifying directly through in situ measurement. Therefore, the peak to valley method demonstrated good potential for assessment of the residual radioactivity for site remediation in decommissioning and contaminated site.

  17. CENSUS AND STATISTICAL CHARACTERIZATION OF SOIL AND WATER QUALITY AT ABANDONED AND OTHER CENTRALIZED AND COMMERCIAL DRILLING-FLUID DISPOSAL SITES IN LOUISIANA, NEW MEXICO, OKLAHOMA, AND TEXAS

    Energy Technology Data Exchange (ETDEWEB)

    Alan R. Dutton; H. Seay Nance

    2003-06-01

    Commercial and centralized drilling-fluid disposal (CCDD) sites receive a portion of spent drilling fluids for disposal from oil and gas exploration and production (E&P) operations. Many older and some abandoned sites may have operated under less stringent regulations than are currently enforced. This study provides a census, compilation, and summary of information on active, inactive, and abandoned CCDD sites in Louisiana, New Mexico, Oklahoma, and Texas, intended as a basis for supporting State-funded assessment and remediation of abandoned sites. Closure of abandoned CCDD sites is within the jurisdiction of State regulatory agencies. Sources of data used in this study on abandoned CCDD sites mainly are permit files at State regulatory agencies. Active and inactive sites were included because data on abandoned sites are sparse. Onsite reserve pits at individual wells for disposal of spent drilling fluid are not part of this study. Of 287 CCDD sites in the four States for which we compiled data, 34 had been abandoned whereas 54 were active and 199 were inactive as of January 2002. Most were disposal-pit facilities; five percent were land treatment facilities. A typical disposal-pit facility has fewer than 3 disposal pits or cells, which have a median size of approximately 2 acres each. Data from well-documented sites may be used to predict some conditions at abandoned sites; older abandoned sites might have outlier concentrations for some metal and organic constituents. Groundwater at a significant number of sites had an average chloride concentration that exceeded nonactionable secondary drinking water standard of 250 mg/L, or a total dissolved solids content of >10,000 mg/L, the limiting definition for underground sources of drinking water source, or both. Background data were lacking, however, so we did not determine whether these concentrations in groundwater reflected site operations. Site remediation has not been found necessary to date for most abandoned

  18. Nevada Test Site site treatment plan. Final annual update. Revision 1

    International Nuclear Information System (INIS)

    1998-04-01

    A Site Treatment Plan (STP) is required for facilities at which the US Department of Energy Nevada Operations Office (DOE/NV) generates or stores mixed waste (MW), defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act (RCRA) and a radioactive material subject to the Atomic Energy Act. This STP was written to identify specific treatment facilities for treating DOE/NV generated MW and provides proposed implementation schedules. This STP was approved by the Nevada Division of Environmental Protection (NDEP) and provided the basis for the negotiation and issuance of the FFCAct Consent Order (CO) dated March 6, 1996. The FFCAct CO sets forth stringent regulatory requirements to comply with the implementation of the STP

  19. Selection and cultivation of final vegetative cover for closed waste sites at the Savannah River Site, SC

    International Nuclear Information System (INIS)

    Cook, J.R.; Salvo, S.K.

    1992-01-01

    Low-level, hazardous, and mixed waste disposal sites normally require some form of plant material to prevent erosion of the final closure cap. Waste disposal sites are closed and capped in a complex scientific manner to minimize water infiltration and percolation into and through the waste material. Turf type grasses are currently being used as a vegetative cover for most sites. Consequently, the sites require periodic mowing and other expensive annual maintenance practices. The purpose of this five year study was to evaluate alternative plant material for use on wastes sites that is quickly and easily established and economically maintained, retards water infiltration, provides maximum year-round evapotranspiration, is ecologically acceptable and does not harm the closure cap. The results of the study are described in this report and suggest that two species of bamboo (Phyllostachys bissetii and P. rubromarainata) can be utilized to provide long lived, low maintenance, climax vegetation for the waste sites. These large species of bamboo will also reduce the probability of intrusion by humans, animals and deeply rooted plant species

  20. Treatment and final disposal of nuclear waste. Siting of a deep repository

    International Nuclear Information System (INIS)

    1992-09-01

    Systems and facilities in the program for demonstration deposition of nuclear waste are presented. The siting process is described, from the general studies to the ultimate goal, where a permit to start demonstration deposition has been obtained. National and foreign experiences of siting issues are accounted for. Finally, the structure and plan for work for 1993-98 are outlined. 46 refs, 15 figs, 5 tabs

  1. NURE aerial gamma-ray and magnetic-reconnaissance survey portions of New Mexico, Arizona, and Texas. Volume I. Instrumentation and data reduction. Final report

    International Nuclear Information System (INIS)

    1981-09-01

    As part of the Department of Energy (DOE) National Uranium Resource Evaluation Program, a rotary-wing high sensitivity radiometric and magnetic survey was flown covering portions of the State of New Mexico, Arizona and Texas. The survey encompassed six 1:250,000 scale quadrangles, Holbrook, El Paso, Las Cruces, Carlsbad, Fort Sumner and Roswell. The survey was flown with a Sikorsky S58T helicopter equipped with a high sensitivity gamma ray spectrometer which was calibrated at the DOE calibration facilities at Walker Field in Grand Junction, Colorado, and the Dynamic Test Range at Lake Mead, Arizona. The radiometric data were processed to compensate for Compton scattering effects and altitude variations. The data were normalized to 400 feet terrain clearance. The reduced data is presented in the form of stacked profiles, standard deviation anomaly plots, histogram plots and microfiche listings. The results of the geologic interpretation of the radiometric data together with the profiles, anomaly maps and histograms are presented in the individual quadrangle reports. The survey was awarded to LKB Resources, Inc. which completed the data acquisition. In April, 1980 Carson Helicopters, Inc. and Carson Geoscience Company agreed to manage the project and complete delivery of this final report

  2. NURE aerial gamma-ray and magnetic-reconnaissance survey portions of New Mexico, Arizona, and Texas. Volume I. Instrumentation and data reduction. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1981-09-01

    As part of the Department of Energy (DOE) National Uranium Resource Evaluation Program, a rotary-wing high sensitivity radiometric and magnetic survey was flown covering portions of the State of New Mexico, Arizona and Texas. The survey encompassed six 1:250,000 scale quadrangles, Holbrook, El Paso, Las Cruces, Carlsbad, Fort Sumner and Roswell. The survey was flown with a Sikorsky S58T helicopter equipped with a high sensitivity gamma ray spectrometer which was calibrated at the DOE calibration facilities at Walker Field in Grand Junction, Colorado, and the Dynamic Test Range at Lake Mead, Arizona. The radiometric data were processed to compensate for Compton scattering effects and altitude variations. The data were normalized to 400 feet terrain clearance. The reduced data is presented in the form of stacked profiles, standard deviation anomaly plots, histogram plots and microfiche listings. The results of the geologic interpretation of the radiometric data together with the profiles, anomaly maps and histograms are presented in the individual quadrangle reports. The survey was awarded to LKB Resources, Inc. which completed the data acquisition. In April, 1980 Carson Helicopters, Inc. and Carson Geoscience Company agreed to manage the project and complete delivery of this final report.

  3. Safeguards for final disposal of spent nuclear fuel. Methods and technologies for the Olkiluoto site

    International Nuclear Information System (INIS)

    Okko, O.

    2003-05-01

    The final disposal of the nuclear material shall introduce new safeguards concerns which have not been addressed previously in IAEA safeguards approaches for spent fuel. The encapsulation plant to be built at the site will be the final opportunity for verification of spent fuel assemblies prior to their transfer to the geological repository. Moreover, additional safety and safeguards measures are considered for the underground repository. Integrated safeguards verification systems will also concentrate on environmental monitoring to observe unannounced activities related to possible diversion schemes at the repository site. The final disposal of spent nuclear fuel in geological formation will begin in Finland within 10 years. After the geological site investigations and according to legal decision made in 2001, the final repository of the spent nuclear fuel shall be located at the Olkiluoto site in Eurajoki. The next phase of site investigations contains the construction of an underground facility, called ONKALO, for rock characterisation purposes. The excavation of the ONKALO is scheduled to start in 2004. Later on, the ONKALO may form a part of the final repository. The plans to construct the underground facility for nuclear material signify that the first safeguards measures, e.g. baseline mapping of the site area, need to take prior to the excavation phase. In order to support the development and implementation of the regulatory control of the final disposal programme, STUK established an independent expert group, LOSKA. The group should support the STUK in the development of the technical safeguards requirements, in the implementation of the safeguards and in the evaluation of the plans of the facility operator. This publication includes four background reports produced by this group. The first of these 'NDA verification of spent fuel, monitoring of disposal canisters, interaction of the safeguards and safety issues in the final disposal' describes the new

  4. Measurement of volatile organic compounds during start-up of bioremediation of French limited superfund site in Crosby Texas using wind dependent whole-air sampling

    International Nuclear Information System (INIS)

    Pleil, J.D.; Fortune, C.R.; Yoong, M.; Oliver, K.D.

    1993-01-01

    Whole-air sampling was performed before and after the start-up of the bioremediation of an industrial (primarily petrochemical) waste lagoon in Crosby Texas, near Houston. Four 'Sector Samplers' were deployed at the four corners of the French Limited Superfund Site. These samplers collect air into one of two SUMMA polished canisters depending upon wind direction and speed. When the wind blows at the sampler from across the waste lagoon, air is routed to the 'IN' sector canister, otherwise sample is collected in the 'OUT' sector canister. As such, each sampler provides its own background sample, and, upon gas chromatographic analysis, individual compounds can be associated with the waste lagoon. Five sets of 24-hour sector samples were taken; the first set was collected prior to the start of the bioremediation effort and the remaining four sets were taken sequentially for four 24-hour periods after the start-up of the procedure

  5. Site safety progress review of spent fuel central interim storage facility. Final report

    International Nuclear Information System (INIS)

    Gurpinar, A.; Serva, L.; Giuliani

    1995-01-01

    Following the request of the Czech Power Board (CEZ) and within the scope of the Technical Cooperation Project CZR/9/003, a progress review of the site safety of the Spent Fuel Central Interim Storage Facility (SFCISF) was performed. The review involved the first two stages of the works comprising the regional survey and identification of candidate sites for the underground and surface storage options. Five sites have been identified as a result of the previous works. The following two stages will involved the identification of the preferred candidate sites for the two options and the final site qualification. The present review had the purpose of assessing the work already performed and making recommendations for the next two stages of works

  6. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume IV

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 4, describes the current safety concerns associated with the tank waste and analyzes the potential accidents and associated potential health effects that could occur under the alternatives included in this Tank Waste Remediation System (TWRS) Final Environmental Impact Statement (EIS) for the Hanford Site, Richland, Washington

  7. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    International Nuclear Information System (INIS)

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC)

  8. Structural constraints for proposed Fort Hancock low-level radioactive waste disposal site (NTP-S34), southern Hudspeth County, Texas

    International Nuclear Information System (INIS)

    Lemone, D.V.

    1989-01-01

    Structural complexities reduce the homogeneity necessary for a site characterization model to an unacceptable level for performance assessment for radioactive waste disposal sites. The proposed site lies between the northern, stable Diablo platform and the southern, mobile Mesozoic Chihuahua tectonic belt. Structural movement along this interface has been active for the past 14,000 years. In addition, the area lies along the northern margin of the Permian Marfa basin and the northeastern margin of the deeply faulted Hueco bolson segment of the late Cenozoic Rio Grande rift system. Recent seismic activity with extensive surface rupture in Quitman Canyon (30 mi southeast of the site) is also documented from the 1931 Valentine, Texas, earthquake (6.4 Richter scale). The site is underlain by either a thrust fault or the complex terminus of a Mesozoic thrust fault. This fault is a segment of the continuous thrust sheet extending from exposures in the Sierra Blanc area, 30 mi east (Devil Ridge fault), to the El Paso area west (Rio Grande fault). This segment of the Devil Ridge-Rio Grande thrust is documented by the Haymond Krupp No. 1 Thaxton wildcat drilled at Campogrande Mountain immediately south of the site. The recent rift fault scarp (Campo Grande) immediately south of the Thaxton well has a 17-mi surface trace and is, no doubt, related to the subsurface Clint fault to the west in the El Paso area. An additional complexity is the presence of a monoclinal flexure with a minimum of 900 ft of surface relief (2 mi northeast of NTP-S34). A 4.5-mi, east-west, down-to-the-south normal fault occurs near the top of the monocline with a small associated graben. These complexities seriously compromise the proposed Fort Hancock site

  9. Texas Yehaa !!!

    DEFF Research Database (Denmark)

    Kjellberg, Kurt

    2001-01-01

    Indtryk fra et besøg på SLA, Special Libraries Associations årlige konference, San Antonio, Texas, USA, 9.-13. juni 2001. "An Information Odyssey: Seizing the Competitive Advantage"......Indtryk fra et besøg på SLA, Special Libraries Associations årlige konference, San Antonio, Texas, USA, 9.-13. juni 2001. "An Information Odyssey: Seizing the Competitive Advantage"...

  10. Site-selection studies for final disposal of spent fuel in Finland

    International Nuclear Information System (INIS)

    Vuorela, P.; Aeikaes, T.

    1984-02-01

    In the management of waste by the Industrial Power Company Ltd. (TVO) preparations are being made for the final disposal of unprocessed spent fuel into the Finnish bedrock. The site selection program will advance in three phases. The final disposal site must be made at the latest by the end of the year 2000, in accordance with a decision laid down by the Finnish Government. In the first phase, 1983-85, the main object is to find homogeneous stable bedrock blocks surrounded by fracture zones located at a safe distance from the planned disposal area. The work usually starts with a regional structural analysis of mosaics of Landsat-1 winter and summer imagery. Next an assortment of different maps, which cover the whole country, is used. Technical methods for geological and hydrogeological site investigations are being developed during the very first phase of the studies, and a borehole 1000 meters deep will be made in southwestern Finland. Studies for the final disposal of spent fuel or high-level reprocessing waste have been made since 1974 in Finland. General suitability studies of the bedrock have been going on since 1977. The present results indicate that suitable investigation areas for the final disposal of highly active waste can be found in Finland

  11. Detailed site characterization for final disposal of spent fuel in Finland - Case study Loviisa

    International Nuclear Information System (INIS)

    Anttila, P.; Ahokas, H.; Ruotsalainen, P.; Cosma, C.; Keskinen, J.; Hinkkanen, H.; Rouhiainen, P.; Oehberg, A.

    1998-01-01

    The spent fuel from the Finnish nuclear power plants will be disposed of in the Finnish bedrock. Pos iva Oy is responsible for the site selection programme carried out in accordance with the governmental decisions. Preliminary site investigations were made in five areas in 1987-1992. Based on the results, three areas, Romuvaara in Kuhmo, Kivetty in Aeaenekoski and Olkiluoto in Eurajoki, were selected for the detailed site characterization in 1993-2000. The final site will be selected by the end of the year 2000. The interim reporting of the detailed studies of the three areas was made in 1996. In 1997, the island of Haestholmen, as the host to the Loviisa NPP, was included as a fourth candidate site in the programme for the detailed site investigations. The goal is to characterize this site also in detail by the end of 2000 to attain the same level of knowledge as available from the three other sites. The background information existing from the studies made for the construction of the repository for the low-and intermediate-level wastes will create a good basis to reach the target. The research programme for the detailed site characterization has mainly been focused on groundwater flow and geochemistry due to their importance in terms of long-term safety of the repository. Equipment and methodology development by Posiva has introduced new tools that provide more accurate data on relevant parameters than the ones used in previous stages of site characterization. The programme also contains studies for additional information of the structural and geological properties of the bedrock towards the depth. Also predictive modelling has been made for evaluating the relevance of the assumptions made. The methods applied in the site characterization have comprised, e.g., geological mapping, deep core drilling, groundwater sampling and analyzing, hydraulic testing and geophysical measurements

  12. Detailed site characterization for final disposal of spent fuel in Finland - Case study Loviisa

    Energy Technology Data Exchange (ETDEWEB)

    Anttila, P. [IVO Power Engineering Ltd. (Finland); Ahokas, H.; Ruotsalainen, P. [Fintact Oy (Finland); Cosma, C.; Keskinen, J. [Vibrometric Oy (Finland); Hinkkanen, H. [Posiva Oy (Finland); Rouhiainen, P. [PRG-Tec Oy (Finland); Oehberg, A. [Saanio and Riekkola Consulting Engineers (Finland)

    1998-09-01

    The spent fuel from the Finnish nuclear power plants will be disposed of in the Finnish bedrock. Pos iva Oy is responsible for the site selection programme carried out in accordance with the governmental decisions. Preliminary site investigations were made in five areas in 1987-1992. Based on the results, three areas, Romuvaara in Kuhmo, Kivetty in Aeaenekoski and Olkiluoto in Eurajoki, were selected for the detailed site characterization in 1993-2000. The final site will be selected by the end of the year 2000. The interim reporting of the detailed studies of the three areas was made in 1996. In 1997, the island of Haestholmen, as the host to the Loviisa NPP, was included as a fourth candidate site in the programme for the detailed site investigations. The goal is to characterize this site also in detail by the end of 2000 to attain the same level of knowledge as available from the three other sites. The background information existing from the studies made for the construction of the repository for the low-and intermediate-level wastes will create a good basis to reach the target. The research programme for the detailed site characterization has mainly been focused on groundwater flow and geochemistry due to their importance in terms of long-term safety of the repository. Equipment and methodology development by Posiva has introduced new tools that provide more accurate data on relevant parameters than the ones used in previous stages of site characterization. The programme also contains studies for additional information of the structural and geological properties of the bedrock towards the depth. Also predictive modelling has been made for evaluating the relevance of the assumptions made. The methods applied in the site characterization have comprised, e.g., geological mapping, deep core drilling, groundwater sampling and analyzing, hydraulic testing and geophysical measurements 23 refs, 4 figs

  13. Challenges with Final Status Surveys at a Large Decommissioning Site - 13417

    International Nuclear Information System (INIS)

    Downey, Heath; Collopy, Peter; Shephard, Eugene; Walter, Nelson; Conant, John

    2013-01-01

    As part of decommissioning a former nuclear fuel manufacturing site, one of the crucial final steps is to conduct Final Status Surveys (FSS) in order to demonstrate compliance with the release criteria. At this decommissioning site, the area for FSS was about 100 hectares (248 acres) and included varying terrain, wooded areas, ponds, excavations, buildings and a brook. The challenges in performing the FSS included determining location, identifying FSS units, logging gamma walkover survey data, determining sample locations, managing water in excavations, and diverting water in the brook. The approaches taken to overcome these challenges will be presented in the paper. The paper will present and discuss lessons learned that will aid others in the FSS process. (authors)

  14. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    International Nuclear Information System (INIS)

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE

  15. Environmental analysis and data report prepared for the environmental assessment of remedial action at the inactive uranium mill tailings site near Falls City, Texas

    International Nuclear Information System (INIS)

    1991-12-01

    This document contains information and data gathered in support of the preparation of the environmental assessment (EA) of the proposed remedial action at the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas. The Falls City EA was prepared pursuant to the National Environmental Policy Act (NEPA), which requires Federal agencies to assess the impacts of their actions on the environment. It examines the short- and long-term effects of the US Department of Energy's (DOE) remedial action for the Falls City site as well as the no action alternative. The DOE will use the information and analyses presented in the EA to determine whether the proposed action would have a significant impact on the environment. If the impacts are determined to be significant, an environmental impact statement (EIS) will be prepared. If the impacts are not determined to be significant, the DOE may issue a Finding of No Significant Impact (FONSI) and implement the proposed action. The information and data presented in this report are for background purposes only and are not required as part of the NEPA decision-making process

  16. Investigation of ground-water contamination at a drainage ditch, Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, 2005–06

    Science.gov (United States)

    Vroblesky, Don A.; Casey, Clifton C.

    2007-01-01

    The U.S. Geological Survey, in cooperation with the Naval Facilities Engineering Command Southeast, used newly developed sampling methods to investigate ground-water contamination by chlorobenzenes beneath a drainage ditch on the southwestern side of Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, during 2005-06. The drainage ditch, which is a potential receptor for ground-water contaminants from Installation Restoration Site 4, intermittently discharges water to Corpus Christi Bay. This report uses data from a new type of pore-water sampler developed for this investigation and other methods to examine the subsurface contamination beneath the drainage ditch. Analysis of ground water from the samplers indicated that chlorobenzenes (maximum detected concentration of 160 micrograms per liter) are present in the ground water beneath the ditch. The concentrations of dissolved oxygen in the samples (less than 0.05-0.4 milligram per liter) showed that the ground water beneath and near the ditch is anaerobic, indicating that substantial chlorobenzene biodegradation in the aquifer beneath the ditch is unlikely. Probable alternative mechanisms of chlorobenzene removal in the ground water beneath the drainage ditch include sorption onto the organic-rich sediment and contaminant depletion by cattails through uptake, sorption, and localized soil aeration.

  17. Design principle of TVO's final repository and preliminary adaptation to site specific conditions

    International Nuclear Information System (INIS)

    Salo, J-P.; Reikkola, R.

    1995-01-01

    Teollisuuden Voima Oy (TVO) is responsible for the management of spent fuel produced by the Olkiluoto power plant. TVO's current programme of spent fuel management is based on the guidelines and time schedule set by the Finnish Government. TVO has studied a final disposal concept in which the spent fuel bundles are encapsulated in copper canisters and emplaced in Finnish bedrock. According to the plan the final repository for spent fuel will be in operation by 2020. TVO's updated technical plans for the disposal of spent fuel together with a performance analysis (TVO-92) were submitted to the authorities in 1992. The paper describes the design principle of TVO's final repository and preliminary adaptation of the repository to site specific conditions. (author). 10 refs., 5 figs

  18. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  19. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    International Nuclear Information System (INIS)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE's satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson

  20. Comment and response document for the final remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Revision 2

    International Nuclear Information System (INIS)

    1996-05-01

    This document for the final remedial action plan and site design has been prepared for US Department of Energy Environmental Restoration Division as part of the Uranium Mill Tailings Remedial Action plan. Comments and responses are included for the site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

  1. EXECUTIVE SUMMARY OF STATE DATA RELATED TO ABANDONED CENTRALIZED AND COMMERCIAL DRILLING-FLUID DISPOSAL SITES IN LOUISIANA, NEW MEXICO, OKLAHOMA, AND TEXAS

    Energy Technology Data Exchange (ETDEWEB)

    H. Seay Nance

    2003-03-01

    This 2003 Spring Semi-Annual Report contains a summary of the Final Technical Report being prepared for the Soil Remediation Requirements at Commercial and Centralized Drilling-Fluid Disposal (CCDD) Sites project funded by the United States Department of Energy under DOE Award No. DE-AC26-99BC15225. The summary describes (1) the objectives of the investigation, (2) a rationale and methodology of the investigation, (3) sources of data, assessment of data quality, and data availability, (4) examples of well documented centralized and commercial drilling-fluid disposal (CCDD) sites and other sites where drilling fluid was disposed of, and (5) examples of abandoned sites and measures undertaken for their assessment and remediation. The report also includes most of the figures, tables, and appendices that will be included in the final report.

  2. Socioeconomic monitoring and mitigation plan for the Salt Repository Project Site, Deaf Smith County, Texas: Revision 5: Draft

    International Nuclear Information System (INIS)

    1988-03-01

    The purpose of the Socioeconomic Monitoring and Mitigation Plan (SMMP) is to identify, in consultation with the affected States and Indian Tribes, potentially significant adverse socioeconomic impacts that could result from site characterization activities, to describe approaches that will be used to monitor any such identified impacts, and to describe procedures for mitigating them. Chapter 3 of the SMMP provides a description of site characterization phase activities planned to assess the geologic condition of the site and construction the exploratory shafts and surface support facilities. The rationale for developing socioeconomic monitoring studies is presented in Chapter 4. Chapter 5 contains descriptions of the socioeconomic monitoring and mitigation procedures whenever they are applicable. Additionally, in Chapter 6, the SMMP includes a procedure for modifying the monitoring and mitigation program and an approach for reporting monitoring results to interested parties. 8 refs., 20 figs., 4 tabs

  3. Use of Proton-Transfer-Reaction Mass Spectrometry to Characterize Volatile Organic Compound Sources at the La Porte Super Site During the Texas Air Quality Study 2000

    Energy Technology Data Exchange (ETDEWEB)

    Karl, Thomas G.; Jobson, B Tom T.; Kuster, W. C.; Williams, Eric; Stutz, Jochen P.; Shetter, Rick; Hall, Samual R.; Goldan, P. D.; Fehsenfeld, Fred C.; Lindinger, Werner

    2003-08-19

    Proton-transfer-reaction mass spectrometry (PTR-MS) was deployed for continuous real-time monitoring of volatile organic compounds (VOCs) at a site near the Houston Ship Channel during the Texas Air Quality Study 2000. Overall, 28 ions dominated the PTR-MS mass spectra and were assigned as anthropogenic aromatics (e.g., benzene, toluene, xylenes) and hydrocarbons (propene, isoprene), oxygenated compounds (e.g., formaldehyde, acetaldehyde, acetone, methanol, C7 carbonyls), and three nitrogencontaining compounds (e.g., HCN, acetonitrile and acrylonitrile). Biogenic VOCs were minor components at this site. Propene was the most abundant lightweight hydrocarbon detected by this technique with concentrations up to 100+ nmol mol-1, and was highly correlated with its oxidation products, formaldehyde (up to ~40 nmol mol-1) and acetaldehyde (up to ~80 nmol/mol), with typical ratios close to 1 in propene-dominated plumes. In the case of aromatic species the high time resolution of the obtained data set helped in identifying different anthropogenic sources (e.g., industrial from urban emissions) and testing current emission inventories. A comparison with results from complimentary techniques (gas chromatography, differential optical absorption spectroscopy) was used to assess the selectivity of this on-line technique in a complex urban and industrial VOC matrix and give an interpretation of mass scans obtained by ‘‘soft’’ chemical ionization using proton-transfer via H3O+. The method was especially valuable in monitoring rapidly changing VOC plumes which passed over the site, and when coupled with meteorological data it was possible to identify likely sources.

  4. Final storage high-level radioactive waste in Sweden - the way to the 2009 siting decision

    International Nuclear Information System (INIS)

    Schneider, Horst

    2010-01-01

    In Sweden, high-level radioactive waste producing heat, i.e. spent fuel, is to be emplaced for final storage on the site of Forsmark, which also holds three reactor units. The siting decision was taken in June 2009. A 100 percent private company, a merger of the commercial nuclear power plant operators as producers of the waste, is responsible for the siting decision as well as for waste storage. Major impulses were given to the back-end fuel cycle policy in the early 1970s. Sweden practically gave up the reprocessing option very soon, but kept on pursuing final storage in deep geologic formations. Between 1977, when legislation was adopted with conditions relating to repository storage, and 2009, when the decision in favour of the Forsmark site was taken, the path followed was not always a straight line. The boundary conditions, such as the organization of the repository and procedural and safety criteria established by the government, are interesting with regard to their influence on the siting decision, if any. For this reason, the approaches chosen and their connections with government criteria and with geological conditions in Sweden, including their impacts on the repository concept chosen, will be examined. After a summary review of developments in Sweden, filing of the licensing application and the accompanying documents up to commissioning of the repository, a short comparison will be made with the situation in Germany, especially the status reached of the Gorleben salt dome, highlighting and evaluating important criteria and parameters. Sweden as a model is important especially in these respects: A repository site was found by a private company in consensus with the local government within the framework of government criteria, and with ultimate responsibility resting with the government; the local government of a place not winning the siting decision is disappointed although it will have the conditioning plant and receive higher grants; it was not only

  5. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site: Final

    International Nuclear Information System (INIS)

    1994-01-01

    Thorium 230 (Th-230) at the Gunnison, Colorado processing site will require remediation, however, a seasonally fluctuating groundwater table at the site significantly complicates conventional remedial action with respect to cleanup. Therefore, to effectively remediate the site with respect to Radium 226 (Ra-226) and Th-230, the following supplemental standard is proposed: In situ Ra-26 will be remediated to the EPA soil cleanup standards independent of groundwater considerations. In situ Th-230 concentrations will be remediated in the region above the encountered water table so the 1000-year projected Ra-226 concentration complies with the EPA soil cleanup concentration limits. If elevated Th-230 persists to the water table, an additional foot of excavation will be performed and the grid will be backfilled. Excavated grids will be backfilled to the final remedial action grade with clean cobbly soil. Final grid verification that is required below the water table will be performed by extracting and analyzing a single bulk soil sample with the bucket of a backhoe. Modeled surface radon flux values will be estimated and documented. A recommendation will be made that land records should be annotated to identify the presence of residual Th-230

  6. Evaluation of brine disposal from the Bryan Mound site of the strategic petroleum reserve program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Case, Robert J.; Chittenden, Jr, Mark E.; Harper, Jr, Donald E.; Kelly, Jr, Francis J.; Loeblich, Laurel A.; McKinney, Larry D.; Minello, Thomas J.; Park, E. Taisoo; Randall, Robert E.; Slowey, J. Frank

    1981-01-01

    On March 10, 1980, the Department of Energy's Strategic Petroleum Reserve Program began leaching the Bryan Mound salt dome and discharging the resulting brine into the coastal waters off Freeport, Texas. During the months of March and April, a team of scientists and engineers from Texas A and M University conducted an intensive environmental study of the area surrounding the diffuser site. A pipeline has been laid from the Bryan Mound site to a location 12.5 statute miles (20 km) offshore. The last 3060 ft (933 m) of this pipeline is a 52-port diffuser through which brine can be discharged at a maximum rate of 680,000 barrels per day. Initially, 16 ports were open which permitted a maximum discharge rate of 350,000 barrels per day and a continuous brine discharge was achieved on March 13, 1980. The purpose of this report is to describe the findings of the project team during the intensive postdisposal study period of March and April, 1980. The major areas of investigation are physical oceanography, analysis of the discharge plume, water and sediment quality, nekton, benthos, phytoplankton, zooplankton, and data management.

  7. Rocky Flats Plant site, Golden, Jefferson County, Colorado. Final environmental impact statement (final statement to ERDA 1545-D)

    International Nuclear Information System (INIS)

    1980-04-01

    This final Environmental Impact Statement (FEIS) incorporates a number of changes as a result of the comments and suggestions received on the Draft Environmental Impact Statement. The major additions and revisions of this first of the three-volume statement are discussed. Chapter titles are: summary; background; environmental impacts; unavoidable adverse environmental effects; alternatives; relationship between short-term uses and long-term productivity; relationship to land-use plans; irreversible and irretrievable commitments of resources; and, environmental trade-off analysis. Chapter 2 includes updated information on seismic stability of the area and seismic design criteria are presented. A mechanism for dissemination of the data from seismic studies in progress is specified. The Plant's personnel protection program with respect to nonradioactive materials, Plant security systems, and the emergency plans of the Plant and the State of Colorado are discussed in greater detail. Material on the environmental monitoring program was updated to reflect current monitoring and measuring conditions. Discussions of various soil sampling methods, plutonium background levels in soil, and plutonium soil standards, are presented. The dose calculations in Chapter 3 were extended to include comparisons of organ doses to natural background organ doses as well as the dose to the whole body. Doses to women and children are considered by exposure pathway as well as those for Standard Man. All credible accident scenarios were reviewed and details updated. A comprehensive discussion of genetic and health effects is presented in Appendices G-2 through G-4. Chapter 5 was revised to reflect the effort and cost involved in decontaminating soil, both on-site and offsite, relative to various decontamination criteria which might be employed

  8. A Study of the Aquaculture Industry in Texas to Assist in Establishing Aquaculture as a Course Offering in Agricultural Science and Technology. Final Report.

    Science.gov (United States)

    Dillingham, John; And Others

    A 1989-90 project determined the knowledge and skills necessary for employment in the aquaculture industry. The study identified technical materials and other resources available in private industry and higher education institutions. Two surveys determined the status of aquaculture in Texas school districts and identified tasks performed by…

  9. Nutrition Education and Training Needs in Texas. Nutrition Education and Training Needs Assessment for Federal Fiscal Year 1995. Final Annual Report.

    Science.gov (United States)

    Martin, Ruth E.; Ahmad, Mahassen

    A 3-year needs assessment study examined nutrition knowledge, attitudes, and food practices. Subjects were 135 preschool children ages 3-5 years, 610 parents, 118 day care teachers and providers, 35 food service personnel, and 76 administrators throughout Texas. Registered family day care homes, group day care homes, and day care centers from 11…

  10. The Application of Adaptive Sampling and Analysis Program (ASAP) Techniques to NORM Sites; FINAL

    International Nuclear Information System (INIS)

    Johnson, Robert; Smith, Karen P.; Quinn, John

    1999-01-01

    The results from the Michigan demonstration establish that this type of approach can be very effective for NORM sites. The advantages include (1) greatly reduced per sample analytical costs; (2) a reduced reliance on soil sampling and ex situ gamma spectroscopy analyses; (3) the ability to combine characterization with remediation activities in one fieldwork cycle; (4) improved documentation; and (5) ultimately better remediation, as measured by greater precision in delineating soils that are not in compliance with requirements from soils that are in compliance. In addition, the demonstration showed that the use of real-time technologies, such as the RadInSoil, can facilitate the implementation of a Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM)-based final status survey program

  11. Lessons from past experiences: Texas

    International Nuclear Information System (INIS)

    Blackburn, T.W. III

    1986-01-01

    A site selection study was conducted in which technical criteria were developed and potential sites numerically ranked. Three candidate sites were chosen, two in south Texas and one in west Texas. Adamant public opposition to the two sites forced a reevaluation and redirection of the siting process. Three sites on state owned lands in west Texas have been identified under the second site selection study. The following are recommended guidelines to incorporate in any public participation program: use multiple approaches at both the regional and local level; identify the public and their true concerns; approach the public at their level and their style; use a slow, deliberate process, siting cannot be forced; be honest and available; give the public an active part in the decision making process; keep elected officials informed and active and encourage information exchange; and be prepared for surprises. Two ranking exercises were also undertaken and are briefly described. The first ranked eleven major issues in order of perceived importance. The second ranked waste disposal technologies. Detailed information on both ranking exercises can be obtained from the Texas Low-Level Radioactive Waste Disposal Authority

  12. Final audit report of remedial action construction at the UMTRA Project Site, Gunnison, Colorado. Revision 0

    International Nuclear Information System (INIS)

    1996-01-01

    The final audit report for remedial action at the Gunnison, Colorado Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the U.S. Department of Energy (DOE) and the Technical Assistance Contractor (TAC); and on-site construction reviews (OSCR) performed by the U.S. Nuclear Regulatory Commission (NRC). Two radiological surveillances and four radiological audits were performed at the Gunnison site. The surveillances were performed on 16 to 19 September 1992 and 28 June to 1 July 1993. The radiological audits were performed on 4 to 7 October 1993; 13 to 16 June 1994; 19 to 22 September 1994 and 10 to 12 July 1995. The surveillances and audits resulted in 79 observations. Thirty-four of the observations raised DOE concerns that were resolved on the site or through subsequent corrective action. All outstanding issues were closed on 12 July 1995. The radiological surveillances and audits are discussed in Section 2.0 of this report. Ten QA in-process surveillances were performed at the Gunnison UMTRA Project site. The surveillances were performed on 24 to 25 September 1992, 7 to 9 July 1993, 29 October 1993, 27 to 28 June 1994, 31 October to 1 November 1994, 19 to 20 June 1 995, 20 to 21 July 1995, 17 to 18 August 1995, 20 September 1995, and 11 to 13 October 1995. The surveillances resulted in 100 observations. Six observations contained recommendations that required responses from the Remedial Action Contractor (RAC). Ninety-five observations contained a recommendation that required no response. All outstanding issues were closed on 8 January 1996. The QA in-process surveillances are discussed in Section 3.0 of this report

  13. Redmedial Action Plan for the Risk-Based Remediation of Site ST14 (SWMU 68), LPSTID 104819; the Former Base Refueling Area (A0C7); the French Underdrain System (SWMU 64); and the North Oil/Water Separator (SWMU 67), Carswell Air Force Base, Naval Air Station Fort Worth Joint Reserve Base, Texas. Volume 1: Report

    National Research Council Canada - National Science Library

    1997-01-01

    ...) to prepare a remedial action plan (RAP) in support of a risk-based remediation decision for soil and groundwater contaminated with fuel hydrocarbons at Site ST14 at Carswell Air Force Base (AFB), Texas...

  14. Geologic setting and geochemistry of thermal water and geothermal assessment, Trans-Pecos Texas. Final report, June 1, 1976-May 31, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Henry, C.D.

    1977-01-01

    Hot springs and wells in West Texas and adjacent Mexico are manifestations of active convective geothermal systems, concentrated in a zone along the Rio Grande between the Quitman Mountains and Big Bend National Park. Maximum temperatures are 47/sup 0/ and 72/sup 0/C for hot springs and wells in Texas and 90/sup 0/C for hot springs in Mexico within 5 km of the border. Existing information is summarized and the results of a 1-year intensive study of the area are presented. The study includes several overlapping phases: (1) compilation of existing geologic information, both regional studies of geology, structure and geophysics, and more detailed local studies of individual hot spring areas; (2) detailed geologic mapping of hot spring areas to understand the origin and geologic controls of hot springs; (3) field measurement and sampling of hot spring or well waters for geochemical analysis; and (4) synthesis and interpretation of the data.

  15. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities. Final report

    International Nuclear Information System (INIS)

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources

  16. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources.

  17. Estimating Emissions of Toxic Hydrocarbons from Natural Gas Production Sites in the Barnett Shale Region of Northern Texas.

    Science.gov (United States)

    Marrero, Josette E; Townsend-Small, Amy; Lyon, David R; Tsai, Tracy R; Meinardi, Simone; Blake, Donald R

    2016-10-04

    Oil and natural gas operations have continued to expand and move closer to densely populated areas, contributing to growing public concerns regarding exposure to hazardous air pollutants. During the Barnett Shale Coordinated Campaign in October, 2013, ground-based whole air samples collected downwind of oil and gas sites revealed enhancements in several potentially toxic volatile organic compounds (VOCs) when compared to background values. Molar emissions ratios relative to methane were determined for hexane, benzene, toluene, ethylbenzene, and xylene (BTEX compounds). Using methane leak rates measured from the Picarro mobile flux plane (MFP) system and a Barnett Shale regional methane emissions inventory, the rates of emission of these toxic gases were calculated. Benzene emissions ranged between 51 ± 4 and 60 ± 4 kg h -1 . Hexane, the most abundantly emitted pollutant, ranged from 642 ± 45 to 1070 ± 340 kg h -1 . While observed hydrocarbon enhancements fall below federal workplace standards, results may indicate a link between emissions from oil and natural gas operations and concerns about exposure to hazardous air pollutants. The larger public health risks associated with the production and distribution of natural gas are of particular importance and warrant further investigation, particularly as the use of natural gas increases in the United States and internationally.

  18. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  19. 75 FR 14359 - FM TABLE OF ALLOTMENTS, Stonewall, Texas

    Science.gov (United States)

    2010-03-25

    ... TABLE OF ALLOTMENTS, Stonewall, Texas AGENCY: Federal Communications Commission. ACTION: Final rule... allotment of Channel 280A at Stonewall, Texas, as the community's first local transmission service. The..., Texas. It is Commission policy to protect applications against subsequently-filed and conflicting rule...

  20. 78 FR 42700 - Radio Broadcasting Services; Matagorda, Texas

    Science.gov (United States)

    2013-07-17

    ... Broadcasting Services; Matagorda, Texas AGENCY: Federal Communications Commission. ACTION: Final rule. SUMMARY... FM Channel 252A at Matagorda, Texas. This allotment change is part of a hybrid rule making and FM... 291A at Matagorda, Texas, is located within 320 kilometers (199 miles) of the U.S.-Mexican border...

  1. Final disposal of spent nuclear fuel-geological, hydrogeological and geophysical methods for site characterization

    International Nuclear Information System (INIS)

    Ahlbom, K.; Carlsson, L.; Olsson, O.

    1983-05-01

    Investigations for the siting of a final repository for high-level radioactive waste are currently being conducted in crystalline rock formations in Sweden. A repository will be located at a depth of about 500 m, and investigations are being carried out in drill holes to below that level. A standard program has been established for the site investigations, comprising a number of phases: 1. General reconnaissance for selection of study site 2. Detailed investigation on the ground surface 3. Depth investigation in drill holes 4. Evaluation and modelling 1. Includes geological and geophysical reconnaissance measurements and drilling of one deep drill hole 2. includes surface and depth investigation within an area of approximately 4-8 km 2 . The surface investigations consist of geophysical measurements including electrical resistivity, magnetization, induced polarization and seismic measurements, and yeild informatin on the composition and fracturing of the bedrock in the superficial parts of the study sites. Mapping of the superficial parts of the bedrock are concluded with short percussion and core drillholes down to 150-250 metres in order to determine the dip and character of fracture zones and rock boundaries. 3. Comprises core drilling to vertical depths of about 600 m, core mapping geophysical well-logging and different hydraulic downhole measurements. In core mapping, the emphasis is placed on fracture characterization of the core. The geophysical logging includes three resistivity methods, natural gamma, induced polarization, spontaneous potential and temperature, salinity, pH and Eh of the drill hole fluid. The hydraulic measurements include: measurements of hydraulic conductivity by single-hole and cross-hole testing, determination of the hydraulic fracture frequency and determination of groundwater head at different levels in the bedrock. (G.B.)

  2. Site-conditions map for Portugal based on VS measurements: methodology and final model

    Science.gov (United States)

    Vilanova, Susana; Narciso, João; Carvalho, João; Lopes, Isabel; Quinta Ferreira, Mario; Moura, Rui; Borges, José; Nemser, Eliza; Pinto, carlos

    2017-04-01

    In this paper we present a statistically significant site-condition model for Portugal based on shear-wave velocity (VS) data and surface geology. We also evaluate the performance of commonly used Vs30 proxies based on exogenous data and analyze the implications of using those proxies for calculating site amplification in seismic hazard assessment. The dataset contains 161 Vs profiles acquired in Portugal in the context of research projects, technical reports, academic thesis and academic papers. The methodologies involved in characterizing the Vs structure at the sites in the database include seismic refraction, multichannel analysis of seismic waves and refraction microtremor. Invasive measurements were performed in selected locations in order to compare the Vs profiles obtained from both invasive and non-invasive techniques. In general there was good agreement in the subsurface structure of Vs30 obtained from the different methodologies. The database flat-file includes information on Vs30, surface geology at 1:50.000 and 1:500.000 scales, elevation and topographic slope and based on SRTM30 topographic dataset. The procedure used to develop the site-conditions map is based on a three-step process that includes defining a preliminary set of geological units based on the literature, performing statistical tests to assess whether or not the differences in the distributions of Vs30 are statistically significant, and merging of the geological units accordingly. The dataset was, to some extent, affected by clustering and/or preferential sampling and therefore a declustering algorithm was applied. The final model includes three geological units: 1) Igneous, metamorphic and old (Paleogene and Mesozoic) sedimentary rocks; 2) Neogene and Pleistocene formations, and 3) Holocene formations. The evaluation of proxies indicates that although geological analogues and topographic slope are in general unbiased, the latter shows significant bias for particular geological units and

  3. Testing the Younger Dryas impact hypothesis with platinum-group elements (PGE), Re, and Os isotopes in sediments from Hall's Cave and Freidken Archaeological site, Texas

    Science.gov (United States)

    Sun, N.; Brandon, A. D.; Forman, S. L.

    2017-12-01

    The Younger Dryas impact hypothesis suggests that extraterrestrial (ET) object(s) hit and exploded over North America 12,900 years ago and triggered the onset of Younger Dryas (YD) cooling and widespread megafaunal extinctions and the demise of the Clovis archeological culture. Supporting signatures such as concentrated carbon spherules and enlogaes, magnetic grains and spherules, nanodiamonds, and Ir-enrichment have been reported, but over time their lack of reproducibility of results at different locations have brought into question the impact hypothesis. Among the impact signatures investigated by previous studies, only few researchers included Re and platinum group element (PGE: Os, Ir, Ru, Rh, Pt, and Pd) characteristic concentrations, and 187Os/188Os ratios for ET mixing in terrestrial materials. Less than 1% of ET materials can provide enriched PGE concentrations, such that PGE are a sensitive tool to identify ET input in terrestrial materials. Because of the large difference between chondritic and continental crust 187Os/188Os ratios, 0.127 and >1.4, respectively, the 187Os/188Os ratios are also highly sensitive indicators of an extraterrestrial component in terrestrial and marine sediments. In this study, we examine sediments associated with the YD from two reported sites in North America, Hall's Cave and the Freidken Archaeological site in Central Texas, using the PGE and Re geochemical approach to test the evidence of the extraterrestrial projectiles during Younger Dryas period. Our current data show at Hall's Cave the PGE concentrations and patterns do not confirm the presence of an elevated meteoritic contribution. However, the 187Os/188Os depth profile shows a sudden 187Os/188Os decrease from 2.28 2.45 to 1.64 at the YD boundary layer, consistent with an increase in material derived from ET projectiles with chondritic 187Os/188Os ratios contaminating the Earth surface at the time of the YD extinction. Additional samples from the YD boundary at the

  4. Effects of a Tobacco-Free Work Site Policy on Employee Tobacco Attitudes and Behaviors, Travis County, Texas, 2010-2012.

    Science.gov (United States)

    Seidel, Sarah E; Metzger, Kristi; Guerra, Andrea; Patton-Levine, Jessie; Singh, Sandeepkumar; Wilson, William T; Huang, Philip

    2017-12-14

    The adoption of tobacco-free policies in behavioral health settings is an important step in reducing staff tobacco use as well as the high rates of tobacco use among people with mental illness and behavioral disorders. Studies have demonstrated the importance of staff support when implementing tobacco-free workplace policies, but there is limited research examining tobacco use prevalence among staff and staff attitude before and after policy adoption. Integral Care, a local authority for behavioral health and developmental disabilities in Austin, Texas, and Austin Public Health embarked on a comprehensive planning process before implementing a 100% tobacco-free campus policy. The objectives were 1) assess staff tobacco use and attitudes toward a tobacco-free policy, 2) communicate policy to staff, 3) provide staff education and training, and 4) provide cessation resources. Integral Care and Austin Public Health conducted a web-based employee survey 6 months before and 6 and 12 months after implementation of the policy to measure tobacco use prevalence and attitudes among employees. Employees had significant improvements in tobacco use prevalence and attitudes toward the tobacco-free policy from pre-implementation to post-implementation. Tobacco use prevalence among staff decreased from 27.6% to 13.8%, and support for the policy increased from 60.6% to 80.3% at 12 months post-implementation. Adoption of 100% tobacco-free campus policies in behavioral health settings can result in significant reductions in staff tobacco use. Leadership should provide staff with education, training, and cessation support before adoption of tobacco-free work site policies to ensure success.

  5. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume VI

    International Nuclear Information System (INIS)

    1996-08-01

    The U.S. Department Of Energy and the Washington State Department of Ecology added Appendix L (Volume 6), Response to Public Comments, to the Tank Waste Remediation System (TWRS) Final Environmental Impact Statement (EIS) for the Hanford Site, Richland, Washington, to fully address and respond to public comments on the Draft EIS. In addition, DOE considered public comments, along with other factors such as programmatic need, short- and long-term impacts, technical feasibility, and cost, in arriving at DOE's preferred alternative. During the public comment period for the Draft EIS, more than 350 individuals, agencies, Tribal Nations, and organizations provided comments. This volume represents a broad spectrum of private citizens; businesses; local, State, and Federal officials; Tribal Nations; and public interest groups

  6. Texas' performance assessment work

    International Nuclear Information System (INIS)

    Charbeneau, R.J.; Hertel, N.E.; Pollard, C.G.

    1990-01-01

    The Texas Low-Level Radioactive Waste Disposal Authority is completing two years of detailed on-site suitability studies of a potential low-level radioactive waste disposal site in Hudspeth County, Texas. The data from these studies have been used to estimate site specific parameters needed to do a performance assessment of the site. The radiological impacts of the site have been analyzed as required for a license application. The approach adopted for the performance assessment was to use simplified and yet conservative assumptions with regard to releases, radionuclide transport, and dose calculations. The methodologies employed in the performance assessment are reviewed in the paper. Rather than rely on a single computer code, a modular approach to the performance assessment was selected. The HELP code was used to calculate the infiltration rate through the trench covers and the amount of leachate released from this arid site. Individual pathway analyses used spreadsheet calculations. These calculations were compared with those from other computer models including CRRIS, INGDOS, PATHRAE, and MICROSHIELD copyright, and found to yield conservative estimates of the effective whole body dose. The greatest difficulty in performing the radiological assessment of the site was the selection of reasonable source terms for release into the environment. A surface water pathway is unreasonable for the site. Though also unlikely, the groundwater pathway with exposure through a site boundary well was found to yield the largest calculated dose. The more likely pathway including transport of leachate from the facility through the unsaturated zone and returning to the ground surface yields small doses. All calculated doses associated with normal releases of radioactivity are below the regulatory limits

  7. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume I

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 1 of the Final Environmental Impact Statement, analyzes the potential environmental consequences related to the Hanford Site Tank Waste Remediation System (TWRS) alternatives for management and disposal of radioactive, hazardous, and mixed waste, and the management and disposal of approximately 1,930 cesium and strontium capsules located at the Hanford Site. This waste is currently or projected to be stored in 177 underground storage tanks and approximately 60 miscellaneous underground storage tanks. This document analyzes the following alternatives for remediating the tank waste: No Action, Long-Term Management, In Situ Fill and Cap, In Situ Vitrification, Ex Situ Intermediate Separations, Ex Situ No Separations, Ex Situ Extensive Separations, Ex Situ/In Situ Combination 1, and Ex Situ/In Situ Combination 2. This document also addresses a Phased Implementation alternative (the DOE and Ecology preferred alternative for remediation of tank waste). Alternatives analyzed for the cesium and strontium capsules include: No Action, Onsite Disposal, Overpack and Ship, and Vitrify with Tank Waste. The DOE and Ecology preferred alternative for the cesium and strontium capsules is the No Action alternative

  8. Low-level waste disposal site performance assessment with the RQ/PQ methodology. Final report

    International Nuclear Information System (INIS)

    Rogers, V.C.; Grant, M.W.; Sutherland, A.A.

    1982-12-01

    A methodology called RQ/PQ (retention quotient/performance quotient) has been developed for relating the potential hazard of radioactive waste to the natural and man-made barriers provided by a disposal facility. The methodology utilizes a systems approach to quantify the safety of low-level waste disposed in a near-surface facility. The main advantages of the RQ/PQ methodology are its simplicity of analysis and clarity of presentation while still allowing a comprehensive set of nuclides and pathways to be treated. Site performance and facility designs for low-level waste disposal can be easily investigated with relatively few parameters needed to define the problem. Application of the methodology has revealed that the key factor affecting the safety of low-level waste disposal in near surface facilities is the potential for intrusion events. Food, inhalation and well water pathways dominate in the analysis of such events. While the food and inhalation pathways are not strongly site-dependent, the well water pathway is. Finally, burial at depths of 5 m or more was shown to reduce the impacts from intrusion events

  9. Quality of groundwater at and near an aquifer storage and recovery site, Bexar, Atascosa, and Wilson Counties, Texas, June 2004-August 2008

    Science.gov (United States)

    Otero, Cassi L.; Petri, Brian L.

    2010-01-01

    The U.S. Geological Survey, in cooperation with the San Antonio Water System, did a study during 2004-08 to characterize the quality of native groundwater from the Edwards aquifer and pre- and post-injection water from the Carrizo aquifer at and near an aquifer storage and recovery (ASR) site in Bexar, Atascosa, and Wilson Counties, Texas. Groundwater samples were collected and analyzed for selected physical properties and constituents to characterize the quality of native groundwater from the Edwards aquifer and pre- and post-injection water from the Carrizo aquifer at and near the ASR site. Geochemical and isotope data indicated no substantial changes in major-ion, trace-element, and isotope chemistry occurred as the water from the Edwards aquifer was transferred through a 38-mile pipeline to the aquifer storage and recovery site. The samples collected from the four ASR recovery wells were similar in major-ion and stable isotope chemistry compared to the samples collected from the Edwards aquifer source wells and the ASR injection well. The similarity could indicate that as Edwards aquifer water was injected, it displaced native Carrizo aquifer water, or, alternatively, if mixing of Edwards and Carrizo aquifer waters was occurring, the major-ion and stable isotope signatures for the Carrizo aquifer water might have been obscured by the signatures of the injected Edwards aquifer water. Differences in the dissolved iron and dissolved manganese concentrations indicate that either minor amounts of mixing occurred between the waters from the two aquifers, or as Edwards aquifer water displaced Carrizo aquifer water it dissolved the iron and manganese directly from the Carrizo Sand. Concentrations of radium-226 in the samples collected at the ASR recovery wells were smaller than the concentrations in samples collected from the Edwards aquifer source wells and from the ASR injection well. The smaller radium-226 concentrations in the samples collected from the ASR

  10. 20-kW solar photovoltaic flat-panel power system for an uninterruptible power-system load in El Paso, Texas. Phase II. System fabrication. Final report October 1, 1979-May 31, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Risser, V.V.

    1981-12-01

    The system plans, construction, integration and test, and performance evaluation are discussed for the photovoltaic power supply at the Newman Power Station in El Paso, Texas. The system consists of 64 parallel-connected panels, each panel containing nine series-connected photovoltaic modules. The system is connected, through power monitoring equipment, to an existing DC bus that supplies uninterruptible power to a computer that controls the power generating equipment. The site is described and possible environmental hazards are assessed. Site preparation and the installation of the photovoltaic panels, electrical cabling, and instrumentation subsystems are described. System testing includes initial system checkout, module performance test, control system test. A training program for operators and maintenance personnel is briefly described, including visual aids. Performance data collection and analysis are described, and actual data are compared with a computer simulation. System drawings are included. (LEW)

  11. Final Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement Richland, Washington

    International Nuclear Information System (INIS)

    Collins, M.S.; Borgstrom, C.M.

    2004-01-01

    The Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement (HSW EIS) provides environmental and technical information concerning U.S. Department of Energy (DOE) proposed waste management practices at the Hanford Site. The HSW EIS updates analyses of environmental consequences from previous documents and provides evaluations for activities that may be implemented consistent with the Waste Management Programmatic Environmental Impact Statement (WM PEIS) Records of Decision (RODs). Waste types considered in the HSW EIS include operational low-level radioactive waste (LLW), mixed low-level waste (MLLW), immobilized low-activity waste (ILAW), and transuranic (TRU) waste (including TRU mixed waste). MLLW contains chemically hazardous components in addition to radionuclides. Alternatives for management of these wastes at the Hanford Site, including the alternative of No Action, are analyzed in detail. The LLW, MLLW, and TRU waste alternatives are evaluated for a range of waste volumes, representing quantities of waste that could be managed at the Hanford Site. A single maximum forecast volume is evaluated for ILAW. The No Action Alternative considers continuation of ongoing waste management practices at the Hanford Site and ceasing some operations when the limits of existing capabilities are reached. The No Action Alternative provides for continued storage of some waste types. The other alternatives evaluate expanded waste management practices including treatment and disposal of most wastes. The potential environmental consequences of the alternatives are generally similar. The major differences occur with respect to the consequences of disposal versus continued storage and with respect to the range of waste volumes managed under the alternatives. DOE's preferred alternative is to dispose of LLW, MLLW, and ILAW in a single, modular, lined facility near PUREX on Hanford's Central Plateau; to treat MLLW using a combination of onsite and

  12. Geological site selection studies for the final disposal of spent nuclear fuel in Finland

    International Nuclear Information System (INIS)

    Salmi, M.; Vuorela, P.; Kuivamaeki, A.

    1985-10-01

    have been met with that should be avoided in the sites to be selected for the final disposal of nuclear waste

  13. Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002); FINAL

    International Nuclear Information System (INIS)

    2002-01-01

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document

  14. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  15. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    International Nuclear Information System (INIS)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions

  16. Nuclear Energy Center study. Phase II. Site suitability analysis. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Fellows, W.S.; Sharp, J.M.; Benator, B.I.

    1978-06-01

    A site screening study was conducted to identify a site or sites for detailed, site-specific study as a nuclear energy center. Using technical criteria of water requirements, geotechnical constraints, and projected load center and transmission considerations as well as environmental and institutional considerations, five potential study sites in the State of South Carolina were identified, evaluated against established criteria, and ranked according to their acceptability as potential nuclear energy center study sites. Consideration of what is ''representative'' of a site as well as the ranking score was factored into site recommendations, since the site deemed easiest to license and permit may not be the most desirable site for future study of the technical and institutional feasibility and practicality of a specific site. The sites near Lake Hartwell and the Savannah River Plant (SRP) of the Department of Energy were selected as potential study sites after consideration of the above criteria. Because the Lake Hartwell site offers the opportunity to consider institutional issues which may be more representative of other possible NEC sites, it is recommended that the Lake Hartwell site be studied to establish the feasibility and practicality of the nuclear energy concept on a site-specific basis.

  17. Nuclear Energy Center study. Phase II. Site suitability analysis. Final report

    International Nuclear Information System (INIS)

    Fellows, W.S.; Sharp, J.M.; Benator, B.I.

    1978-06-01

    A site screening study was conducted to identify a site or sites for detailed, site-specific study as a nuclear energy center. Using technical criteria of water requirements, geotechnical constraints, and projected load center and transmission considerations as well as environmental and institutional considerations, five potential study sites in the State of South Carolina were identified, evaluated against established criteria, and ranked according to their acceptability as potential nuclear energy center study sites. Consideration of what is ''representative'' of a site as well as the ranking score was factored into site recommendations, since the site deemed easiest to license and permit may not be the most desirable site for future study of the technical and institutional feasibility and practicality of a specific site. The sites near Lake Hartwell and the Savannah River Plant (SRP) of the Department of Energy were selected as potential study sites after consideration of the above criteria. Because the Lake Hartwell site offers the opportunity to consider institutional issues which may be more representative of other possible NEC sites, it is recommended that the Lake Hartwell site be studied to establish the feasibility and practicality of the nuclear energy concept on a site-specific basis

  18. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume II

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 2, provides the inventory of waste addressed in this Final Environmental Impact Statement (EIS) for the Tank Waste Remediation System, Hanford Site, Richland, Washington. The inventories consist of waste from the following four groups: (1) Tank waste; (2) Cesium (Cs) and Strontium (Sr) capsules; (3) Inactive miscellaneous underground storage tanks (MUSTs); and (4) Anticipated future tank waste additions. The major component by volume of the overall waste is the tank waste inventory (including future tank waste additions). This component accounts for more than 99 percent of the total waste volume and approximately 70 percent of the radiological activity of the four waste groups identified previously. Tank waste data are available on a tank-by-tank basis, but the accuracy of these data is suspect because they primarily are based on historical records of transfers between tanks rather than statistically based sampling and analyses programs. However, while the inventory of any specific tank may be suspect, the overall inventory for all of the tanks combined is considered more accurate. The tank waste inventory data are provided as the estimated overall chemical masses and radioactivity levels for the single-shell tanks (SSTs) and double-shell tanks (DSTs). The tank waste inventory data are broken down into tank groupings or source areas that were developed for analyzing groundwater impacts

  19. Final disposal of spent nuclear fuel-equipment for site characterization

    International Nuclear Information System (INIS)

    Almen, K.; Hansson, K.; Johansson, B.E.; Nilsson, G.; Andersson, O.; Wikberg, P.; Aahagen, H.

    1983-05-01

    The suitability of a certain geological formation as a repository for the final disposal of spent nuclear fuel can be determined only after detailed investigation and analysis. The purpose of the investigations is to provide information on the geology and the hydrology and chemistry of the site concerned. The value of these data largely depends on the way in which they have been collected. The report of the findings should enable the investigating party to evaluate the function and the accuracy of the equipment with which field data have been collected for KBS 3. This report describes the geophysical equipment, the hydraulic testing equipment, the water chemistry sample extracting equipment and the core-logging equipment used. The objectives of the instrument development have been: - to obtain a high data quality. - to collect data automatically in logs and tape recorders for direct transfer to a central processing unit. - to provide back-up in order to counteract loss of data. - to make instrument more efficient. (author)

  20. Final environmental impact statement for the Nevada Test Site and off-site locations in the State of Nevada. Summary

    International Nuclear Information System (INIS)

    1996-08-01

    This sitewide EIS evaluates the potential environmental impacts of four possible land-use alternatives being considered for the Nevada Test Site (NTS), the Tonopah Test Range, and the formerly operated DOE sites in the state of Nevada: the Project Shoal Area, the Central Nevada Test Area, and portions of the Nellis Air Force Range Complex. Three additional sites in Nevada-Eldorado Valley, Dry Lake Valley, and Coyote Spring Valley-are evaluated for collocation of solar energy production facilities. The four alternatives include Continue Current Operations (No Action, continue to operate at the level maintained for the past 3 to 5 years); Discontinue Operations 1 (discontinue operations and interagency programs); Expanded Use (increased use of NTS and its resources to support defense and nondefense programs); and Alternate Use of Withdrawn Lands (discontinue all defense-related activities at NTS; continue waste management operations in support of NTS environmental restoration efforts; expand nondefense research). Environmental impacts were assessed for each alternative by analyzing, to the extent possible, the discrete and cumulative environmental impacts associated with Defense Waste Management, Environmental Restoration, Nondefense Research and Development, and Work for Others Programs. A framework for a Resource Management Plan is included as Volume 2 of this EIS and represents the development of an ecosystem based planning process closely integrated with the National Environmental Policy Act process. This EIS, among other things, analyzed the impacts of transportation of low level waste, and site characterization activities related to the Yucca Mountain Project but did not analyze the suitability of the site as a repository. This EIS does not analyze the suitability of the Yucca Mountain site as a repository as this is an action beyond the scope of the EIS. Volume 3 of this EIS contains the public comments and the responses to the comments

  1. Final Environmental Impact Statement for the Nevada Test Site and off- site locations in the state of Nevada: Reader's guide

    International Nuclear Information System (INIS)

    1996-08-01

    This Reader's Guide is designed to help you find information in the US Departments of Energy's Nevada Test Site Environmental Impact Statement (NTS EIS). This Guide is divided into four sections: an introduction to the NTS EIS, specific topics, number conversions and scientific notations and public reading room locations

  2. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Ft. Hood Military Base Outside Killeen, Texas. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Geiger, J.; Lisell, L.; Mosey, G.

    2013-10-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative through the Region 6 contract, selected Ft. Hood Army Base in Killeen, Texas, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this study is to assess the site for possible photovoltaic (PV) system installations and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  3. Investigation and demonstration of turbidity reduction in stormwater runoff for Oklahoma highway construction sites : final report.

    Science.gov (United States)

    2013-12-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction industry to control the discharge of pollutants from the sites. The construction effluent guidelines or ELGs require construction sites to reduce the pollu...

  4. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado: Final report

    International Nuclear Information System (INIS)

    1990-02-01

    This radiologic characterization of tho two inactive uranium millsites at Rifle, Colorado, was conducted by Bendix Field Engineering Corporation (Bendix) for the US Department of Energy (DOE), Grand Junction Projects Office, in accord with a Statement of Work prepared by the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor, Jacobs Engineering Group, Inc. (Jacobs). The purpose of this project is to define the extent of radioactive contamination at the Rifle sites that exceeds US Environmental Protection Agency, (EPA) standards for UMTRA sites. The data presented in this report are required for characterization of the areas adjacent to the tailings piles and for the subsequent design of cleanup activities. An orientation visit to the study area was conducted on 31 July--1 August 1984, in conjunction with Jacobs, to determine the approximate extent of contaminated area surrounding tho piles. During that visit, survey control points were located and baselines were defined from which survey grids would later be established; drilling requirements were assessed; and radiologic and geochemical data were collected for use in planning the radiologic fieldwork. The information gained from this visit was used by Jacobs, with cooperation by Bendix, to determine the scope of work required for the radiologic characterization of the Rifle sites. Fieldwork at Rifle was conducted from 1 October through 16 November 1984

  5. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    International Nuclear Information System (INIS)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites

  6. Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program -12184

    Energy Technology Data Exchange (ETDEWEB)

    Clayton, Christopher [U.S Department of Energy Office of Legacy Management, Washington, DC; Kothari, Vijendra [U.S Department of Energy Office of Legacy Management, Morgantown, West Virginia; Starr, Ken [U.S Department of Energy Office of Legacy Management, Westminster, Colorado; Widdop, Michael; Gillespie, Joey [SM Stoller Corporation, Grand Junction, Colorado

    2012-02-26

    The U. S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS&M) program: Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. DOE must continue to maintain constructive relationships with the U

  7. Nuclear safety analyses and core design calculations to convert the Texas A & M University Nuclear Science Center reactor to low enrichment uranium fuel. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Parish, T.A.

    1995-03-02

    This project involved performing the nuclear design and safety analyses needed to modify the license issued by the Nuclear Regulatory Commission to allow operation of the Texas A& M University Nuclear Science Center Reactor (NSCR) with a core containing low enrichment uranium (LEU) fuel. The specific type of LEU fuel to be considered was the TRIGA 20-20 fuel produced by General Atomic. Computer codes for the neutronic analyses were provided by Argonne National Laboratory (ANL) and the assistance of William Woodruff of ANL in helping the NSCR staff to learn the proper use of the codes is gratefully acknowledged. The codes applied in the LEU analyses were WIMSd4/m, DIF3D, NCTRIGA and PARET. These codes allowed full three dimensional, temperature and burnup dependent calculations modelling the NSCR core to be performed for the first time. In addition, temperature coefficients of reactivity and pulsing calculations were carried out in-house, whereas in the past this modelling had been performed at General Atomic. In order to benchmark the newly acquired codes, modelling of the current NSCR core with highly enriched uranium fuel was also carried out. Calculated results were compared to both earlier licensing calculations and experimental data and the new methods were found to achieve excellent agreement with both. Therefore, even if an LEU core is never loaded at the NSCR, this project has resulted in a significant improvement in the nuclear safety analysis capabilities established and maintained at the NSCR.

  8. Environmental analysis of geopressured-geothermal prospect areas, De Witt and Colorado counties, Texas. Final report, March 1 - August 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Gustavson, T.C.; Reeder, F.S.; Badger, E.A.

    1980-02-01

    Information collected and analyzed for a preliminary environmental analysis of geopressured geothermal prospect areas in Colorado and DeWitt Counties, Texas is presented. Specific environmental concerns for each geopressured geothermal prospect area are identified and discussed. Approximately 218 km/sup 2/(85 mi/sup 2/) were studied in the vicinity of each prospect area to: (1) conduct an environmental analysis to identify more and less suited areas for geopressured test wells; and (2) provide an environmental data base for future development of geopressured geothermal energy resources. A series of maps and tables are included to illustrate environmental characteristics including: geology, water resources, soils, current land use, vegetation, wildlife, and meteorological characteristics, and additional relevant information on cultural resources, power- and pipelines, and regulatory agencies. A series of transparent overlays at the scale of the original mapping has also been produced for the purposes of identifying and ranking areas of potential conflict between geopressured geothermal development and environmental characteristics. The methodology for ranking suitability of areas within the two prospect areas is discussed in the appendix. (MHR)

  9. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    International Nuclear Information System (INIS)

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd 3 ) (2.1 million cubic meters [m 3 ]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd 3 (15,000 m 3 ) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd 3 (420,000 m 3 ). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd 3 (2.58 million m 3 ). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations

  10. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd{sup 3} (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3} (420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations.

  11. Typhus in Texas

    Centers for Disease Control (CDC) Podcasts

    Dr. Kristy Murray, an associate professor in pediatrics and assistant dean of the National School of Tropical Medicine at Baylor College of Medicine and Texas Children's Hospital, discusses increased cases of typhus in southern Texas.

  12. SUPERCOLLIDER: Texas meeting

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    With preparations pushing forward for the Superconducting Supercollider (SSC) to be built in Ellis County, Texas, there was a full agenda at the third SSC fall conference, held in Corpus Christi, Texas, from 14-17 October

  13. Final disposal of radioactive wastes. Site selection criteria. Technical and economical factors

    International Nuclear Information System (INIS)

    Granero, J.J.

    1984-01-01

    General considerations, geological and socioeconomical criteria for final disposal of radioactive wastes in geological formations are treated. More attention is given to the final disposal of high level radioactive wastes and different solutions searched abroad which seems of interest for Spain. (author)

  14. Cone penetrometer testing at the Hanford Site: Final performance evaluation report

    International Nuclear Information System (INIS)

    Richterich, L.R.; Cassem, B.R.

    1994-08-01

    The Volatile Organic Compounds-Arid Integrated Demonstration (VOC-Arid ID) is one of several US Department of Energy (DOE) integrated demonstrations designed to support the testing of emerging environmental characterization and remediation technologies in support of the Environmental Restoration (ER) and Waste Management (WM) Programs. The primary objective of the VOC Arid ID at the Hanford Site is to characterize, remediate, and monitor arid and semi-arid sites containing volatile organic compounds with or without associated contamination. The main objective of the Arid Drilling Technology Technical Task Plan is to demonstrate promising subsurface access technologies; this includes using the cone penetrometer (CPT) system for source detection, characterization, monitoring, and remediation in support of environmental activities. The utility of the CPT for performing site characterization work has been the subject of much discussion and speculation at the Hanford Site and other arid sites because of the preponderance of thick units of coarse cobbles and gravel in the subsurface

  15. Treasured Texas Theaters

    Science.gov (United States)

    Horton, Anita

    2012-01-01

    Dallas artist Jon Flaming's deep love of Texas is evident in his paintings and sculpture. Although he has created one sculptural Texas theater, his work primarily showcases old Texas barbershops, vacant homes, and gas stations. In this article, the author describes how her students, inspired by Flaming's works, created three-dimensional historical…

  16. Final environmental impact statement for the Nevada Test Site and off-site locations in the state of Nevada: Mitigation action plan

    International Nuclear Information System (INIS)

    1997-02-01

    The DOE Notice of Availability for this environmental impact statement was published in the Federal Register on Friday, October 18, 1996 (61 FR 54437). The final environmental impact statement identifies potential adverse effects resulting from the four use alternatives evaluated and discusses measures that DOE considered for the mitigation of these potential adverse effects. The Secretary of Energy signed the Record of Decision on the management and operation of the Nevada Test Site and other DOE sites in the state of Nevada on December 9, 1996. These decisions will result in the continuation of the multipurpose, multi-program use of the Nevada Test Site, under which DOE will pursue a further diversification of interagency, private industry, and public-education uses while meeting its Defense Program, Waste Management, and Environmental Restoration mission requirements at the Nevada Test Site and other Nevada sites, including the Tonopah Test Range, the Project Shoal Site, the Central Nevada Test Area, and on the Nellis Air Force Range Complex. The Record of Decision also identifies specific mitigation actions beyond the routine day-to-day physical and administrative controls needed for implementation of the decisions. These specific mitigation actions are focused on the transportation of waste and on groundwater availability. This Mitigation Action Plan elaborates on these mitigation commitments

  17. Site investigations for final disposal of high-level nuclear waste

    International Nuclear Information System (INIS)

    Aeikaes, T.; Laine, T.

    1982-12-01

    Research concerning disposal of high-level nuclear waste of the Industrial Power Company Ltd has focused on deep underground disposal in Finnish precambrian bedrock. The present target is to have a repository for high-level waste in operation by 2020. Selection of the repository site is based on site investigations. In addition to geosciences, selection of appropriate site includes many branches of studies; engineering, safety analysis, ecology, transport, demography etc. The investigations required for site selection for high-level waste have been arranged in a sequence of four phases. The aim of the phases is that investigations become more and more detailed as the selection process continues. Phase I of the investigations is the characterization of potential areas. This comprises establishment of criteria for site selection and identification of areas that meet selection criteria. Objective of these studies is to determine areas for phase II field investigations. The studies are largely made by reviewing existing data and remote-sensing techniques. Phase II field investigations will be undertaken between 1986-1992. The number of potential candidates for repository site is reduced to few preferred areas by preceeding generic study. The site selection process culminates in phase III in site confirmation studies carried out at 2...3 most suitable sites during 1992-2010. This is then followed by phase IV, which comprises very detailed investigations at the selected site. An alternative for these investigations is to undertake them by using pilot shaft and drifts. Active development is taking place in all phases concerning investigation methods, criteria, parameters, data processing and modelling. The applicability of the various investigation methods and techniques is tested in a deep borehole in phase I. The co-operation with countries with similar geological conditions makes it possible to compare results obtained by different techniques

  18. Final work plan: Expedited Site Characterization of the IES Industries, Inc., Site at Marshalltown, Iowa. Ames Expedited Site Characterization Project, Version 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-04

    The overall goal of the Ames Laboratory Expedited Site Characterization (ESC) project is to evaluate and promote both innovative and state-of-the-practice site characterization and/or monitoring technologies. This will be accomplished by fielding both types of technologies together in the context of an expedited site characterization. The first site will be at a former manufactured gas plant (FMGP) in Marshalltown, Iowa. The project will field three areas of technology: geophysical, analytical, and data fusion. Geophysical technologies are designed to understand the subsurface geology to help predict fate and transport of the target contaminants. Analytical technologies/methods are designed to detect and quantify the target contaminants. Data fusion technology consists of software systems designed to rapidly integrate or fuse all site information into a conceptual site model that then becomes the decision making tool for the site team to plan subsequent sampling activity. Not all of the contaminants present can be located at the action level. Polynuclear aromatic hydrocarbons (PAHs) are the signature organics associated with the coal tar activities that took place at the site. As a result, PAHs were selected as the target compounds. Screening analytical instruments and nonintrusive geophysical techniques will be fielded to qualitatively map the spatial contaminant distribution. Soil gas surveys, immunoassay testing (IMA), innovative optical techniques, and passive organic sorbent sensors will be deployed along with the geophysical methods. Gas chromatography/mass spectrometry (GC/MS) instruments and a cone penetrometer system equipped with a laser-induced fluorescence (LIF) probe will quantitatively map the action level edges of the PAH plume(s). Samples will be taken both by the cone penetrometer test system (CPT) and the Geoprobe {reg_sign} sampler system.

  19. Final report of fugitive and diffuse emissions evaluations at the Hanford Site, CY 1994

    International Nuclear Information System (INIS)

    Gleckler, B.P.; Schmidt, J.W.

    1995-01-01

    The objective of this study was to evaluate several of Hanford's major diffuse emission sources and evaluate the effectiveness of monitoring these sources individually versus collectively. The results from this evaluation may also be utilized to demonstrate Westinghouse's compliance status with the applicable air emissions regulations and determine if additional studies and/or evaluations are necessary. Air sampling results from four waste handling and storage facilities were collected for a one week period and analyzed. The following is a list of the selected sampling sites: Plutonium Finishing Plant; 241-BY Tank Farm; 1301-N Trench; 300 Area Trenches and North Ponds. These sites were chosen as being representative of most of the Hanford waste sites, which are known to be diffuse emission sites. The sites were evaluated on the following criteria: physical size, surface contamination levels, geology, vegetation density, surface cover, potential for occupational exposure, and potential for public exposure. The selected sites vary greatly with the selection criteria parameters, and as a result should provide representative data for most of Hanford's waste sites

  20. Water Resources Research Program. Abatement of malodors at diked, dredged-material disposal sites. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, W.; Dravnieks, A.; Zussman, R.; Goltz, R.

    1976-06-01

    Samples of malodorous air and dredged material were collected at diked disposal sites at the following locations: Buffalo, NY; Milwaukee, WI; Mobile, AL; York Harbor, ME; Houston, TX; Detroit, MI; and Anacortes, WA; during the period July--October, 1975. Odorous compounds in the air samples were identified by gas chromatography/mass spectrometry, while the detection threshold, intensity, and character of the various odors were determined by experienced panelists using a dynamic, forced-choice-triangle olfactometer. Although significant problems with malodors were not observed beyond the disposal-area dikes during site visits, noteworthy odor episodes had occurred at some sites. An odor-abatement strategy is presented for handling the expected range of odor conditions at dredged-material disposal sites. Its aim is to reduce to an acceptable level the intensity of malodors in an affected community. The main steps in the strategy cover selection of the disposal site, site preparation, odor characterization of sediments to be dredged, malodor abatement during dredging and disposal operations, malodor abatement after filling of the disposal site, and the handling of malodor complaints.

  1. SKI's and SSI's experiences from their participation in the siting of a final repository for spent nuclear fuel

    International Nuclear Information System (INIS)

    Westerlind, M.; Hedberg, B.

    2000-01-01

    This paper summarises some experiences gained by the SKI and SSI during the ongoing process for siting a final repository for spent nuclear fuel. The focus is on activities in the municipalities involved in the siting process. In order to give the proper context some basic elements in the legislation, which are important for public participation and confidence in the siting process, are outlined. The importance of clearly defined responsibilities and early participation of the regulators in the siting process are emphasised. It should be pointed out that this paper is not a comprehensive review of the Swedish situation but only contains a few selected issues and personal remarks from the authors. Thus, the views and opinions do not necessarily coincide with those of SKI and SSI. (authors)

  2. An economic analysis of a monitored retrievable storage site for Tennessee. Final report and appendices

    Energy Technology Data Exchange (ETDEWEB)

    Fox, W.F.; Mayo, J.W.; Hansen, L.T.; Quindry, K.E.

    1985-12-17

    The United States Department of Energy is charged with the task of identifying potential sites for a Monitored Retrievable Storage (MRS) Facility and reporting the results of its analysis to Congress by January 1986. DOE chose three finalist sites from 11 sites DOE analysts evaluated earlier. All three are in Tennessee, including two in Oak Ridge and one in Trousdale/Smith Counties. This paper is a summary of research undertaken on the economic effects of establishing the MRS facility in Tennessee. All three locations were considered in the analysis, but on some occasions attention is focused on the site preferred by DOE. The research was undertaken by the Center for Business and Economic Research (CBER), College of Business Administration, the University of Tennessee, Knoxville, under contract with the Tennessee Department of Economic and Community Development.

  3. Final Hanford Site Transuranic (TRU) Waste Characterization Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP

  4. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site near Gunnison, Colorado. Final

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    The presence of contaminated uranium mill tailings adjacent to the city of Gunnison has been a local concern for many years. The following issues were identified during public meetings that were held by the DOE prior to distribution of an earlier version of this EA. Many of these issues will require mitigation. Groundwater contamination; in December 1989, a herd of 105 antelope were introduced in an area that includes the Landfill disposal site. There is concern that remedial action-related traffic in the area would result in antelope mortality. The proposed Tenderfoot Mountain haul road may restrict antelope access to their water supply; a second wildlife issue concerns the potential reduction in sage grouse use of breeding grounds (leks) and nesting habitat; the proposed Tenderfoot Mountain haul road would cross areas designated as wetlands by US Army Corps of Engineers (COE); the proposed disposal site is currently used for grazing by cattle six weeks a year in the spring. Additional concerns were stated in comments on a previous version of this EA. The proposed action is to consolidate and remove all contaminated materials associated with the Gunnison processing site to the Landfill disposal site six air miles east of Gunnison. All structures on the site (e.g., water tower, office buildings) were demolished in 1991. The debris is being stored on the site until it can be incorporated into the disposal cell at the disposal site. All contaminated materials would be trucked to the Landfill disposal site on a to-be-constructed haul road that crosses BLM-administered land.

  5. Energy-conserving site-design case study, Radisson, New York. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-12-01

    Radisson is a 2,950-acre new community currently being developed by the New York State Urban Development Corporation and located in central New York, 12 miles north-west of Syracuse. Case-study sites selected for this project are a 95-acre residential site and the 51-acre Town Center of the new community. Development on the Residential Site is a low-density (2.8 dwelling units/acre) mixture of single-family, townhouse and multi-family units. Development on the Town Center site is a mixture of small-scale commercial use (144,000 sq. ft.) and 330+ multi-family dwelling units. Energy-conserving plans developed for both sites have focused on passive measures to reduce energy use for space heating. Utility-system options have been identified for both sites, but require further study as to feasibility and cost. This report summarizes energy savings and cost differentials due to passive measures incorporated in both the residential and Town Center Plans. The future implementation schedule, also discussed, summarizes the procedures an schedule required for implementation of the passive measures, as well as further study required for the development of utility-system options. 4 tables.

  6. High-level radioactive-waste-disposal investigations in Texas

    International Nuclear Information System (INIS)

    Smith, R.D.

    1983-01-01

    The Texas Energy and Natural Resources Advisory Council (TENRAC) was designated in 1980 to coordinate the interaction between the State of Texas and the federal government relating to the high-level radioactive waste disposal issue. This report was prepared to summarize the many aspects of that issue with particular emphasis on the activities in Texas. The report is intended to provide a comprehensive introduction for individuals with little or no previous exposure to the issue and to provide a broader perspective for those individuals who have addressed specific aspects of the issue but have not had the opportunity to study it in a broader context. Following the introduction, contents of this report are as follows: (1) general status of major repository siting investigations in the US; (2) detailed review of Texas studies; (3) possible facilities to be sited in Texas; (4) current Texas policy; (5) federal regulations; and (6) federal legislation. 9 figures, 2 tables

  7. Site characterization in connection with the low level defense waste management site in Area 5 of the Nevada Test Site, Nye County, Nevada. Final report

    International Nuclear Information System (INIS)

    Case, C.; Davis, J.; French, R.; Raker, S.

    1984-09-01

    The Site Characterization Report for the Defense Low Level Waste Management Site (RWMS) in Area 5 of the Nevada Test Site deals with the FY80-FY84 DRI activities. The areas that have been studied include geology, hydrology, unsaturated flow, soil and soil water chemistry, flood hazard, and economics-demographics. During this time the site characterization effort focussed on the following items as requested by NVO: geological and hydrological limitations to greater depth disposal of radioactive waste; potential for tectonic, seismic or volcanic activity (extent and frequency which these processes significantly affect the ability of the disposal operation to meet performance objectives); the possibility of groundwater intrusion into the waste zone, and its significance; topography of the RWMS with significance to drainage and flood potential (100-year flood plain, coastal high-hazard area or wetland); upstream drainage which may require modification to avoid erosion; population growth and future development; and the presence or absence of economically significant natural resources which, if exploited, would result in failure to meet performance objectives. The items mentioned above are dealt with in the description of activities and results in the body of the report. Extensive references, 32 figures, 20 tables

  8. Final environmental impact statement for the Nevada Test Site and off-site locations in the State of Nevada. Framework for the resource management plan, Volume 2

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this document is to publicize how the U.S. Department of Energy Nevada Operations Office (DOE/NV) proposes to develop and use a Resource Management Plan for the Nevada Test Site (NTS) so the public could comment on and assist in the following activities: (1) Developing the methods for creating and using the plan; (2) Identifying the values people place on manmade and natural resources found on the NTS; (3) Developing the goals the DOE/NV will use to guide the conservation and use of those resources; (4) Identifying the management actions needed to meet constraints and resource management goals; and (5) Incorporating the principles of ecosystem management into land and resource management on the NTS. This framework for the Resource Management Plan was developed in conjunction with the Environmental Impact Statement for the Nevada Test Site and off-site locations in the state of Nevada (NTS EIS) to take advantage of the extensive data collection and public participation activities associated with the National Environmental Policy Act. After public input was received during the comment period for the Draft NTS EIS, DOE/NV revised this description of the Resource Management Plan and published it with the NTS Final EIS. This revision includes the goals DOE/NV has developed for managing resources and land-use constraints. It also includes the final plans for developing the Resource Management Plan. These plans will guide DOE/NV as it develops a Resource Management Plan in the coming years

  9. Social and economical aspects in the selection of the site for the final Goiania waste repository

    International Nuclear Information System (INIS)

    Paschoa, A.S.; Tranjan Filho, A.; Rosenthal, J.J.

    2000-01-01

    Site selection criteria for low and intermediate level waste repositories are usually well established as far as the technological and scientific bases are concerned. However, social, cultural and economical aspects need to be examined on a case by case basis because there are many situations to be faced before succeeding to convince the public and authorities that a waste repository is to be built at any chosen site. In the specific case of Goiania there is an ongoing process that started several years ago, to make the repository accepted by local, state and national authorities, and to answer legitimate questions raised by significant segments of the population. This paper will summarise those more relevant aspects concerning the site selection process for the Goiania repository. (author)

  10. Revegetation and rock cover for stabilization of inactive uranium mill tailings disposal sites. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Beedlow, P.A.

    1984-05-01

    Guidelines for using vegetation and rock to protect inactive uranium mill tailings from erosion were developed by Pacific Northwest Laboratory as part of the Department of Energy's Uranium Mill Tailings Remedial Action Project (UMTRAP) Technology Development program. Information on soils, climate, and vegetation were collected for 20 inactive tailings sites in the western United States. Sites were grouped according to similarities in climate and vegetation. Soil loss for those sites was characterized using the Universal Soil Loss Equation. Test plots were used to evaluate (1) the interaction between vegetation and sealant barrier systems and (2) the effects of surface rock on soil water and vegetation. Lysimeter and simulation studies were used to direct and support field experiments. 49 references, 17 figures, 16 tables.

  11. Revegetation and rock cover for stabilization of inactive uranium mill tailings disposal sites. Final report

    International Nuclear Information System (INIS)

    Beedlow, P.A.

    1984-05-01

    Guidelines for using vegetation and rock to protect inactive uranium mill tailings from erosion were developed by Pacific Northwest Laboratory as part of the Department of Energy's Uranium Mill Tailings Remedial Action Project (UMTRAP) Technology Development program. Information on soils, climate, and vegetation were collected for 20 inactive tailings sites in the western United States. Sites were grouped according to similarities in climate and vegetation. Soil loss for those sites was characterized using the Universal Soil Loss Equation. Test plots were used to evaluate (1) the interaction between vegetation and sealant barrier systems and (2) the effects of surface rock on soil water and vegetation. Lysimeter and simulation studies were used to direct and support field experiments. 49 references, 17 figures, 16 tables

  12. Remedial action at the Acid/Pueblo Canyon site, Los Alamos, New Mexico. Final report

    International Nuclear Information System (INIS)

    1984-10-01

    The Acid/Pueblo Canyon site (TA-45) was designated in 1976 for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). During the period 1943 to 1964 untreated and treated liquid wastes generated by nuclear weapons research activities at the Los Alamos Scientific Laboratory (LASL) were discharged into the two canyons. A survey of the site conducted by LASL in 1976 to 1977 identified two areas where radiological contamination exceeded criteria levels. The selected remedial action was based on extensive radiological characterization and comprehensive engineering assessments and comprised the excavation and disposal of 390 yd 3 of contaminated soil and rock. This document describes the background to the remedial action, the parties involved in administering and executing it, the chronology of the work, verification of the adequacy of the remedial action, and the cost incurred. 14 references, 5 figures, 5 tables

  13. Superfund Record of Decision (EPA Region 8): Denver Radium Site Streets, Colorado, March 1986. Final report

    International Nuclear Information System (INIS)

    1986-01-01

    Denver Radium Site Streets is located in Denver, Colorado. The operable unit is comprised of eight street segments in the Cheesman Park area and one segment in the upper downtown area. The nine contaminated street segments are owned by the City and County of Denver and extend approximately 4.5 miles through largely residential areas. The Denver Radium Site Streets contain a 4- to 6-inch layer of radium-contaminated asphalt. The contaminated layer is underlain by compacted gravel road base and is usually overlain by 4 to 12 inches of uncontaminated asphalt pavement. There is an estimated 38,500 cubic yards of contaminated material covering approximately 832,000 square feet. The selected remedial action for the site includes: leaving the contaminated material in place; improving institutional controls; and removing any contaminated material excavated during routine maintenance, repair, or construction activities in the affected streets to a facility approved for storage or disposal of contaminated material

  14. The SocioEconomic analysis of repository siting (SEARS): Guide to data base preparation: Final draft

    International Nuclear Information System (INIS)

    Hamm, R.R.; Murdock, S.H.; Leistritz, F.L.; Kiel, B.; Parpia, B.

    1984-11-01

    This guide describes the data bases in the SocioEconomic Analysis of Repository Siting (SEARS) modeling system. This model is a user-interactive, computerized model for projecting the economic, demographic, public service, and fiscal impacts of repository siting. This guide provides a description of the data bases, sources of data, data formats, and preprocessing programs for adapting and implementing the SEARS system and is seen as an essential reference for technical users of the model. It should be used in conjunction with reports describing the model's features and characteristics. 95 refs., 3 tabs

  15. Independent Verification Final Summary Report for the David Witherspoon, Inc. 1630 Site Knoxville, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    P.C. Weaver

    2009-04-29

    The primary objective of the independent verification was to determine if BJC performed the appropriate actions to meet the specified “hot spot” cleanup criteria of 500 picocuries per gram (pCi/g) uranium-238 (U-238) in surface soil. Specific tasks performed by the independent verification team (IVT) to satisfy this objective included: 1) performing radiological walkover surveys, and 2) collecting soil samples for independent analyses. The independent verification (IV) efforts were designed to evaluate radioactive contaminants (specifically U-238) in the exposed surfaces below one foot of the original site grade, given that the top one foot layer of soil on the site was removed in its entirety.

  16. Independent Verification Final Summary Report for the David Witherspoon, Inc. 1630 Site Knoxville, Tennessee

    International Nuclear Information System (INIS)

    Weaver, P.C.

    2009-01-01

    The primary objective of the independent verification was to determine if BJC performed the appropriate actions to meet the specified 'hot spot' cleanup criteria of 500 picocuries per gram (pCi/g) uranium-238 (U-238) in surface soil. Specific tasks performed by the independent verification team (IVT) to satisfy this objective included: (1) performing radiological walkover surveys, and (2) collecting soil samples for independent analyses. The independent verification (IV) efforts were designed to evaluate radioactive contaminants (specifically U-238) in the exposed surfaces below one foot of the original site grade, given that the top one foot layer of soil on the site was removed in its entirety.

  17. Final report for Texas A&M University Group Contribution to DE-FG02-09ER25949/DE-SC0002505: Topology for Statistical Modeling of Petascale Data (and ASCR-funded collaboration between Sandia National Labs, Texas A&M University and University of Utah)

    Energy Technology Data Exchange (ETDEWEB)

    Rojas, Joseph Maurice [Texas A& M University

    2013-02-27

    We summarize the contributions of the Texas A\\&M University Group to the project (DE-FG02-09ER25949/DE-SC0002505: Topology for Statistical Modeling of Petascale Data - an ASCR-funded collaboration between Sandia National Labs, Texas A\\&M U, and U Utah) during 6/9/2011 -- 2/27/2013.

  18. Final Hanford Site Transuranic (TRU) Waste Characterization Qualit Assurance Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP)

  19. 78 FR 75913 - Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site...

    Science.gov (United States)

    2013-12-13

    ... site, including the disposal of Hanford's low-level radioactive waste (LLW) and mixed low-level... would be processed for disposal in Low- Level Radioactive Waste Burial Grounds (LLBGs) Trenches 31 and... treating radioactive waste from 177 underground storage tanks (149 Single-Shell Tanks [SSTs] and 28 Double...

  20. Final environmental impact assessment of the Paducah Gaseous Diffusion Plant site, Paducah, Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    1982-08-01

    This document considers: the need for uranium enrichment facilities; site location; plant description; and describes the power generating facilities in light of its existing environment. The impacts from continuing operations are compared with alternatives of shutdown, relocation, and alternative power systems. (PSB)

  1. Geomorphic stability field reconnaissance site visit, Canonsburg, Pennsylvania, December 1992. Final report

    International Nuclear Information System (INIS)

    1993-05-01

    To license the Canonsburg site, the US Nuclear Regulatory Commission (NRC) has required that geomorphic stability be demonstrated for the stream banks and slopes around the perimeter of the site for 200 years. Based on a study of the stream channel and slopes, it has been determined that due to recent human intervention, the required geomorphic stability cannot now be achieved without installation of erosion protection works and continued monitoring of the site. The Pittsburgh District Corps of Engineers has plans to channelize Chartiers Creek and install erosion protection rock within the next 5 or 6 years, if local government agencies raise the necessary matching funds. Much of the stream bank and slope adjacent to the ''fenced in'' western area of the site is anticipated to remain geomorphically stable for more than 20 years, but less than 200 years without human intervention. Therefore in much of this area, the Corps of Engineers will have adequate time to perform its work without jeopardizing the integrity of the controlled area. In contrast, two approximately 200-foot (ft) (60-meter [m]) long portions of the stream channel located north-northwest of the encapsulation area are subject to active stream erosion that threatens the integrity of the controlled area. These areas should be fixed by installation of erosion protection rock within the next 2 years

  2. Final report on the radiological surveys of designated DX firing sites at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    1996-01-01

    CHEMRAD was contracted by Los Alamos National Laboratory to perform USRADS reg-sign (UltraSonic Ranging And Data System) radiation scanning surveys at designated DX Sites at the Los Alamos National Laboratory. The primary purpose of these scanning surveys was to identify the presence of Depleted Uranium (D-38) resulting from activities at the DX Firing Sites. This effort was conducted to update the most recent surveys of these areas. This current effort was initiated with site orientation on August 12, 1996. Surveys were completed in the field on September 4, 1996. This Executive Summary briefly presents the major findings of this work. The detail survey results are presented in the balance of this report and are organized by Technical Area and Site number in section 2. This organization is not in chronological order. USRADS and the related survey methods are described in section 3. Quality Control issues are addressed in section 4. Surveys were conducted with an array of radiation detectors either mounted on a backpack frame for man-carried use (Manual mode) or on a tricycle cart (RadCart mode). The array included radiation detectors for gamma and beta surface near surface contamination as well as dose rate at 1 meter above grade. The radiation detectors were interfaced directly to an USRADS 2100 Data Pack

  3. Improving regulatory effectiveness in Federal/State siting actions. Success factor evaluation panel. Final report

    International Nuclear Information System (INIS)

    Haggard, J.

    1977-06-01

    An independent appraisal of the factors that determine efficiency in reaching environmental decisions with respect to nuclear facilities was addressed. The Panel recommended to substitute 'effectiveness' for 'efficiency.' Thus, an effective decision is: 'A timely final decision, that provides for necessary change, consistent with societal objectives and law, and which is equitable and practical, and is based upon fully and candidly expressed premises utilizing a commonly available data base.' The measurement criteria for evaluating the effectiveness of the environmental decision making process are: timely decision, final decision, provision for change, consistency with societal goals and law, equitable, practical, fully and candidly expressed premises, commonly available data base, and public confidence. The Panel evaluated the 8 policies proposed by NRC staff as essential to licensing reform: national fuels policy, regional review, early disclosure, State role, technical assistance to State, role of utilities, radiation health and safety, and modification of the Atomic Energy Act. The five NRC scenarios were evaluated in terms of regulatory effectiveness

  4. Multi-agency radiation survey and site investigation manual (MARSIM). Final report

    International Nuclear Information System (INIS)

    1997-12-01

    The MARSSIM provides information on planning, conducting, evaluating, and documenting building surface and surface soil final status radiological surveys for demonstrating compliance with dose or risk-based regulations or standards. The MARSSIM is a multi-agency consensus document that was developed collaboratively by four Federal agencies having authority and control over radioactive materials: Department of Defense (DOD), Department of Energy (DOE), Environmental Protection Agency (EPA), and Nuclear Regulatory Commission (NRC). The MARSSIM's objective is to describe a consistent approach for planning, performing, and assessing building surface and surface soil final status surveys to meet established dose or risk-based release criteria, while at the same time encouraging an effective use of resources

  5. Multi-agency radiation survey and site investigation manual (MARSIM). Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The MARSSIM provides information on planning, conducting, evaluating, and documenting building surface and surface soil final status radiological surveys for demonstrating compliance with dose or risk-based regulations or standards. The MARSSIM is a multi-agency consensus document that was developed collaboratively by four Federal agencies having authority and control over radioactive materials: Department of Defense (DOD), Department of Energy (DOE), Environmental Protection Agency (EPA), and Nuclear Regulatory Commission (NRC). The MARSSIM`s objective is to describe a consistent approach for planning, performing, and assessing building surface and surface soil final status surveys to meet established dose or risk-based release criteria, while at the same time encouraging an effective use of resources.

  6. Final disposal of spent nuclear fuel in Finnish bedrock - Kivetty site report

    International Nuclear Information System (INIS)

    Anttila, P.; Ahokas, H.; Front, K.

    1999-06-01

    Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Haestholmen in Loviisa, Kivetty in Aeaenekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Kivetty. The bedrock of Kivetty belongs to the large Svecofennian granitoid complex of central Finland, about 1880 million years in age. The most common rock type is porphyritic granodiorite, which is cut by younger medium-grained granodiorite and porphyritic or even-grained granite. Minor bodies of gabbro, older than the porphyritic granodiorite, are also present. The granitoids show evidence of two deformation phases. Altogether 29 bedrock 'structures' (R-structures) have been modelled at the investigation site, most of them representing steeply dipping fracture zones. The rock mass between the fracture zones represents what is termed 'intact rock', which is typically hard, unweathered and sparsely fractured. The R-structures are generally hydraulically more conductive than the intact rock and their mean transmissivity is 1.3-10 -6 m 2 /s. The corresponding mean of the hydraulic conductivity values for the intact rock, measured using a 2 m packer interval is 4*10 -11 m 2 /s, if a lognormal distribution for all measured values is assumed. A clear decrease in hydraulic conductivity with depth has been found for the intact rock, and there seems to be a parallel decrease in the transmissivity of structures. In addition, the hydraulically conductive fractures seem to be more frequent and their transmissivities higher in the uppermost 100 - 200 m of the bedrock than at greater depths. The groundwater of Kivetty is classified as fresh water and

  7. Final disposal of spent nuclear fuel in Finnish bedrock - Romuvaara site report

    International Nuclear Information System (INIS)

    Anttila, P.; Ahokas, H.; Front, K.

    1999-06-01

    Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Haestholmen in Loviisa, Kivetty in Aeaenekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Romuvaara. The bedrock of Romuvaara belongs to the Archean basement complex, whose oldest parts date back over 2800 million years. The bedrock consists mainly of migmatitic banded gneisses (tonalite, leucotonalite and mica gneiss), which are cut by granodiorite and metadiabase dykes. The rocks, excluding the metadiabase, have undergone a polyphase Archaean deformation. Altogether 31 bedrock structures (R-structures) have been modelled at the investigation site, most of them representing steeply dipping fracture zones. The rock mass between the fracture zones represents what is termed 'intact rock', which is typically hard, unweathered and sparsely fractured. The R-structures are generally hydraulically more conductive than the intact rock and their mean transmissivity is 1.6 x 10 -7 m 2 /s. The corresponding mean of the hydraulic conductivity values for the intact rock measured using a 2 m packer interval is 8 x 10 -12 m/s, if a lognormal distribution for all measured values is assumed. A clear decrease in hydraulic conductivity with depth has been found, for both the R-structures and the intact rock. In addition, the hydraulically conductive fractures seem to be more frequent and their transmissivities higher in the uppermost 100 - 200 m of the bedrock than at greater depths. The groundwater of Romuvaara is classified as fresh water and the Total Dissolved Solids (TDS) and chloride contents increase with depth. The chemically most evolved

  8. Final disposal of spent nuclear fuel in Finnish bedrock - Romuvaara site report

    Energy Technology Data Exchange (ETDEWEB)

    Anttila, P. [Fortum Engineering Oy (Finland); Ahokas, H. [Fintact Oy (Finland); Front, K. [VTT Communities and Infrastructure, Espoo (Finland)] [and others

    1999-06-01

    Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Haestholmen in Loviisa, Kivetty in Aeaenekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Romuvaara. The bedrock of Romuvaara belongs to the Archean basement complex, whose oldest parts date back over 2800 million years. The bedrock consists mainly of migmatitic banded gneisses (tonalite, leucotonalite and mica gneiss), which are cut by granodiorite and metadiabase dykes. The rocks, excluding the metadiabase, have undergone a polyphase Archaean deformation. Altogether 31 bedrock structures (R-structures) have been modelled at the investigation site, most of them representing steeply dipping fracture zones. The rock mass between the fracture zones represents what is termed `intact rock`, which is typically hard, unweathered and sparsely fractured. The R-structures are generally hydraulically more conductive than the intact rock and their mean transmissivity is 1.6 x 10{sup -7} m{sup 2}/s. The corresponding mean of the hydraulic conductivity values for the intact rock measured using a 2 m packer interval is 8 x 10{sup -12} m/s, if a lognormal distribution for all measured values is assumed. A clear decrease in hydraulic conductivity with depth has been found, for both the R-structures and the intact rock. In addition, the hydraulically conductive fractures seem to be more frequent and their transmissivities higher in the uppermost 100 - 200 m of the bedrock than at greater depths. The groundwater of Romuvaara is classified as fresh water and the Total Dissolved Solids (TDS) and chloride contents increase with depth. The chemically

  9. Furthering Medical Education in Texas.

    Science.gov (United States)

    Varma, Surendra K; Jennings, John

    2016-02-01

    Medical education in Texas is moving in the right direction. The Texas Medical Association has been a major partner in advancing medical education initiatives. This special symposium issue on medical education examines residency training costs, the Next Accreditation System, graduate medical education in rural Texas, Texas' physician workforce needs, the current state of education reform, and efforts to retain medical graduates in Texas.

  10. Low-level waste disposal site selection demonstration

    International Nuclear Information System (INIS)

    Rogers, V.C.

    1984-01-01

    This paper discusses the results of recent studies undertaken at EPRI related to low-level waste disposal technology. The initial work provided an overview of the state of the art including an assessment of its influence upon transportation costs and waste form requirements. The paper discusses work done on the overall system design aspects and computer modeling of disposal site performance characteristics. The results of this analysis are presented and provide a relative ranking of the importance of disposal parameters. This allows trade-off evaluations to be made of factors important in the design of a shallow land burial facility. To help minimize the impact of a shortage of low-level radioactive waste disposal sites, EPRI is closely observing the development of bellweather projects for developing new sites. The purpose of this activity is to provide information about lessons learned in those projects in order to expedite the development of additional disposal facilities. This paper describes most of the major stems in selecting a low-level radioactive waste disposal site in Texas. It shows how the Texas Low-Level Radioactive Waste Disposal Authority started with a wide range of potential siting areas in Texas and narrowed its attention down to a few preferred sites. The parameters used to discriminate between large areas of Texas and, eventually, 50 candidate disposal sites are described, along with the steps in the process. The Texas process is compared to those described in DOE and EPRI handbooks on site selection and to pertinent NRC requirements. The paper also describes how an inventory of low-level waste specific to Texas was developed and applied in preliminary performance assessments of two candidate sites. Finally, generic closure requirements and closure operations for low-level waste facilities in arid regions are given

  11. Site planning for a final nuclear disposal site without rights of action? On the actual draft for a site selection law

    International Nuclear Information System (INIS)

    Wollenteit, Ulrich

    2013-01-01

    'Good' and 'substantial' grounds for determining the location of a Federal final repository by law are not apparent. The acceleration argument from the Stendal decision is not available. The legitimacy argument provides no substantial reason for believing that the implementation of an administrative planning permission hearing or approval procedure is associated with significant disadvantages for the common weal. Thus, there is no justifiable reason for a reduction of legal protection. However, the fundamental right to legal protection guarantee requires that the expropriation may be examined comprehensively on its legality in factual and legal relationship by means of the judiciary power.

  12. Barometric pressure transient testing applications at the Nevada Test Site: formation permeability analysis. Final report

    International Nuclear Information System (INIS)

    Hanson, J.M.

    1984-12-01

    The report evaluates previous investigations of the gas permeability of the rock surrounding emplacement holes at the Nevada Test Site. The discussion sets the framework from which the present uncertainty in gas permeability can be overcome. The usefulness of the barometric pressure testing method has been established. Flow models were used to evaluate barometric pressure transients taken at NTS holes U2fe, U19ac and U20ai. 31 refs., 103 figs., 18 tabs

  13. Pilot-scale incineration of comtaminated soils from the drake chemical superfund site. Final report

    International Nuclear Information System (INIS)

    King, C.; Lee, J.W.; Waterland, L.R.

    1993-03-01

    A series of pilot-scale incineration tests were performed at the U.S. Environmental Protection Agency's (EPA's) Incineration Research Facility to evaluate the potential of incineration as an option to treat contaminated soils from the Drake Chemical Superfund site in Lock Haven, Pennsylvania. The soils at the Drake site are reported to be contaminated to varying degrees with various organic constituents and several hazardous constituent trace metals. The purpose of the test program was to evaluate the incinerability of selected site soils in terms of the destruction of contaminant organic constituents and the fate of contaminant trace metals. All tests were conducted in the rotary kiln incineration system at the IRF. Test results show that greater than 99.995 percent principal organic hazardous constituent (POHC) destruction and removal efficiencies (DRE) can be achieved at kiln exit gas temperatures of nominally 816 C (1,500 F) and 538 C (1,000 F). Complete soil decontamination of semivolatile organics was achieved; however, kiln ash levels of three volatile organic constituents remained comparable to soil levels

  14. Evaluation of the need, feasibility, and siting of the MRS in Tennessee. Draft final report

    Energy Technology Data Exchange (ETDEWEB)

    Colglazier, E.W. Jr. [Tennessee Univ., Knoxville, TN (United States)

    1985-12-16

    This summary report outlines the results of an independent assessment of the need, feasibility, and siting of the proposed Monitored Retrievable Storage (MRS) facility. The detailed reports of this assessment are included as appendices to the summary report. The Department of Energy (DOE) has concluded that the MRS is not absolutely necessary, but preferred, in order to manage and move spent fuel from reactors to a repository. The team has attemped to assess ``need`` by comparing to advantages and disadvantages of various systems, with and without the MRS. ``Feasibility has been assessed by comparing the technical and economic advantages and disadvantages. The team was not asked to recommend a preferred system. That choice will depend on the importance that are used to compare alternatives. The five key criteria selected by the team for comparing alternate systems were: economic cost, radiological risk, non-radiological transportation impacts, the likelihood of successful implementation and operation of the system, and the likelihood of meeting the schedule in the Nuclear Waste Policy Act. The team compared twelve different systems and modeled the transportation impacts and risks with three repository sites and two MRS sites.

  15. Site operator program final report for fiscal years 1992 through 1996

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab.; Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Birasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

    1998-01-01

    The Site Operator Program was an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed at the Idaho National Engineering and Environmental Laboratory. The Program`s goals included the field evaluation of electric vehicles in real-world applications and environments; the support of electric vehicle technology advancement; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles. This report covers Program activities from 1992 to 1996. The Site Operator Program ended in September 1996, when it was superseded by the Field Operations Program. Electric vehicle testing included baseline performance testing, which was performed in conjunction with EV America. The baseline performance parameters included acceleration, braking, range, energy efficiency, and charging time. The Program collected fleet operations data on electric vehicles operated by the Program`s thirteen partners, comprising electric utilities, universities, and federal agencies. The Program`s partners had over 250 electric vehicles, from vehicle converters and original equipment manufacturers, in their operating fleets. Test results are available via the World Wide Web site at http://ev.inel.gov/sop.

  16. Conceptual model for regional radionuclide transport from a basalt repository site. Final draft, technical memorandum

    Energy Technology Data Exchange (ETDEWEB)

    Walton, W.C.; Voorhees, M.L.; Prickett, T.A.

    1980-05-23

    This technical memorandum was prepared to: (1) describe a typical basalt radionuclide repository site, (2) describe geologic and hydrologic processes associated with regional radionuclide transport in basalts, (3) define the parameters required to model regional radionuclide transport from a basalt repository site, and (4) develop a ''conceptual model'' of radionuclide transport from a basalt repository site. In a general hydrological sense, basalts may be described as layered sequences of aquifers and aquitards. The Columbia River Basalt, centered near the semi-arid Pasco Basin, is considered by many to be typical basalt repository host rock. Detailed description of the flow system including flow velocities with high-low hydraulic conductivity sequences are not possible with existing data. However, according to theory, waste-transport routes are ultimately towards the Columbia River and the lengths of flow paths from the repository to the biosphere may be relatively short. There are many physical, chemical, thermal, and nuclear processes with associated parameters that together determine the possible pattern of radionuclide migration in basalts and surrounding formations. Brief process descriptions and associated parameter lists are provided. Emphasis has been placed on the use of the distribution coefficient in simulating ion exchange. The use of the distribution coefficient approach is limited because it takes into account only relatively fast mass transfer processes. In general, knowledge of hydrogeochemical processes is primitive.

  17. Formerly utilized MED/AEC sites remedial action program. Final report

    International Nuclear Information System (INIS)

    Stoker, A.

    1981-05-01

    Current radiological conditions were evaluated for the site of a former radioactive liquid waste treatment plant and the interconnected canyons that received both treated and untreated effluents between 1944 and 1951. The liquid radioactive wastes were generated by research with nuclear materials at Los Alamos, New Mexico, for the World War II Manhattan Engineer District atomic bomb project and subsequently by work conducted for the Atomic Energy Commission. After decommissioning of the treatment plant and decontamination of the site and part of one canyon, ownership of some of the land in question was transferred to Los Alamos County by the Federal Government in 1967. Some residual radioactivity attributable to the effluents remained and is found on soils and sediments at the former plant site and in the channels of the canyons. The study considered all relevant information including historical records, environmental data extending back to the 1940s, and new data acquired by special field sampling and measurements. Potential exposures to radiation were evaluated for conditions of current and possible future land uses. Maximum estimated doses were about 12% of radiation protection standards, and most were less than 2%. 18 figures, 120 tables

  18. Botanical inventory of the Rocky Flats AEC site. Final report, April 29, 1976--July 31, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Webber, P.J.

    1979-04-01

    The present plant life of the Rocky Flats site and surrounding area was documented. This documentation is intended as a base-line description which may be used by researchers and managers. The analysis of natural vegetation, including plant species inventory, vegetation composition study, and identification of major environmental control factors at the Rocky Flats site provides a data base on which future environmental decisions concerning, for example, future construction and handling of disturbance on this site can be made. The establishment of morphological norms for potential plant indicators of mutagenic hazards serves as a start for development of a vegetation-based system for detection of possible changes in plant life induced by accidental plutonium release around the plant. This study is not directed towards assessing any past or present industrial impacts of plutonium processing. The principal products from the contract are a list of vascular plants, bryophytes, and lichens, a 1:12,000 color vegetation map, five large scale (1:500) maps of special study and experimental areas, and a description of the morphological norms of two common vascular plant species.

  19. Conceptual model for regional radionuclide transport from a basalt repository site. Final draft, technical memorandum

    International Nuclear Information System (INIS)

    Walton, W.C.; Voorhees, M.L.; Prickett, T.A.

    1980-01-01

    This technical memorandum was prepared to: (1) describe a typical basalt radionuclide repository site, (2) describe geologic and hydrologic processes associated with regional radionuclide transport in basalts, (3) define the parameters required to model regional radionuclide transport from a basalt repository site, and (4) develop a ''conceptual model'' of radionuclide transport from a basalt repository site. In a general hydrological sense, basalts may be described as layered sequences of aquifers and aquitards. The Columbia River Basalt, centered near the semi-arid Pasco Basin, is considered by many to be typical basalt repository host rock. Detailed description of the flow system including flow velocities with high-low hydraulic conductivity sequences are not possible with existing data. However, according to theory, waste-transport routes are ultimately towards the Columbia River and the lengths of flow paths from the repository to the biosphere may be relatively short. There are many physical, chemical, thermal, and nuclear processes with associated parameters that together determine the possible pattern of radionuclide migration in basalts and surrounding formations. Brief process descriptions and associated parameter lists are provided. Emphasis has been placed on the use of the distribution coefficient in simulating ion exchange. The use of the distribution coefficient approach is limited because it takes into account only relatively fast mass transfer processes. In general, knowledge of hydrogeochemical processes is primitive

  20. Energy conserving site design case study, Burke Center, Virginia. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-12-01

    The pattern of energy consumption within a modern suburban community, Burke Center, is examined. A variety of actions that could be incorporated to reduce its future energy demands is proposed. Recommendations have been limited to those that are technically feasible today, are reasonably cost-effective, and that should generate little or no market resistance. Findings are that: of the total energy consumed by the Burke Center Community, 57% will go to off-site transportation needs; energy conserving site planning generally coincides with cost-effective site planning; water-to-air heat pumps proved to be the most efficient and cost-effective method available today in the study area for reducing heating and cooling costs in buildings; certain public services such as the collection of solid waste, mail pick-up and delivery, and other routine activities can be made more energy efficient; and the use of available water saving devices in residential and commercial buildings can reduce a community's total utility energy consumption by as much as 20%. (MCW)

  1. Final Phase II report : QuickSite(R) investigation, Everest, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Research)

    2003-11-01

    this reason, the CCC/USDA is conducting an environmental site investigation to determine the source(s) and extent of the carbon tetrachloride contamination at Everest and to assess whether the contamination requires remedial action. The investigation at Everest is being performed by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. At these facilities, Argonne is applying its QuickSite{reg_sign} environmental site characterization methodology. This methodology has been applied successfully at a number of former CCC/USDA facilities in Kansas and Nebraska and has been adopted by the American Society for Testing and Materials (ASTM 1998) as standard practice for environmental site characterization. Phase I of the QuickSite{reg_sign} investigation examined the key geologic, hydrogeologic, and hydrogeochemical relationships that define potential contaminant migration pathways at Everest (Argonne 2001). Phase II of the QuickSite{reg_sign} investigation at Everest was undertaken with the primary goal of delineating and improving understanding of the distribution of carbon tetrachloride contamination in groundwater at this site and the potential source area(s) that might have contributed to this contamination. To address this goal, four specific technical objectives were developed to guide the Phase II field studies. Sampling of near-surface soils at the former Everest CCC/USDA facility that was originally planned for Phase I had to be postponed until October 2000 because of access restrictions. Viable vegetation was not available for sampling then. This period is termed the first session of Phase II

  2. Final disposal of spent nuclear fuel in Finnish bedrock. Olkiluoto site report

    International Nuclear Information System (INIS)

    Anttila, P.; Ahokas, H.; Front, K.

    1999-06-01

    Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Haestholmen in Loviisa, Kivetty in Aeaenekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Olkiluoto. The bedrock of the Olkiluoto site consists of Svecofennian metasediments and platonic rocks, 1800-1900 million years in age. Migmatitic mica gneiss is the most abundant rock type, and is intruded by foliated tonalites and granodiorites and massive coarse-grained granites and pegmatites. Five successive plastic deformation phases have been defined. In total, 30 bedrock structures (R-structures) have been modelled at the site. Most of these represent steeply dipping fracture zones, but several sub-horizontal zones, gently dipping to the SE, have also been identified. The rock mass between the fracture zones represents what is termed 'intact rock', which is typically hard, unweathered and sparsely fractured. The R-structures are generally hydraulically more conductive than the intact rock and their mean transmissivity is 3 x 10 -7 m 2 /s. The corresponding mean of the hydraulic conductivity values for the intact rock measured using a 2 m packer interval, is 8 x 10 -13 m/s, if a lognormal distribution for all measured values is assumed. A clear decrease in hydraulic conductivity with depth has been found for the intact rock, and there seems to be a parallel decrease in the transmissivity of structures. In addition, the hydraulically conductive fractures seem to be more frequent and their transmissivities higher in the uppermost 100 - 200 m of the bedrock than at greater depths. The groundwater chemistry reflects the postglacial

  3. Final disposal of spent nuclear fuel in Finnish bedrock. Olkiluoto site report

    Energy Technology Data Exchange (ETDEWEB)

    Anttila, P. [Fortum Engineering Oy, Vantaa (Finland); Ahokas, H. [Fintact Oy, Helsinki (Finland); Front, K. [VTT Communication and Infrastructure, Espoo (Finland)] [and others

    1999-06-01

    Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Haestholmen in Loviisa, Kivetty in Aeaenekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Olkiluoto. The bedrock of the Olkiluoto site consists of Svecofennian metasediments and platonic rocks, 1800-1900 million years in age. Migmatitic mica gneiss is the most abundant rock type, and is intruded by foliated tonalites and granodiorites and massive coarse-grained granites and pegmatites. Five successive plastic deformation phases have been defined. In total, 30 bedrock structures (R-structures) have been modelled at the site. Most of these represent steeply dipping fracture zones, but several sub-horizontal zones, gently dipping to the SE, have also been identified. The rock mass between the fracture zones represents what is termed `intact rock`, which is typically hard, unweathered and sparsely fractured. The R-structures are generally hydraulically more conductive than the intact rock and their mean transmissivity is 3 x 10{sup -7} m{sup 2}/s. The corresponding mean of the hydraulic conductivity values for the intact rock measured using a 2 m packer interval, is 8 x 10{sup -13} m/s, if a lognormal distribution for all measured values is assumed. A clear decrease in hydraulic conductivity with depth has been found for the intact rock, and there seems to be a parallel decrease in the transmissivity of structures. In addition, the hydraulically conductive fractures seem to be more frequent and their transmissivities higher in the uppermost 100 - 200 m of the bedrock than at greater depths. The groundwater chemistry reflects the

  4. Final disposal of spent nuclear fuel in Finnish bedrock. Haestholmen site report

    International Nuclear Information System (INIS)

    Anttila, P.; Ahokas, H.; Front, K.

    1999-06-01

    Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Haestholmen in Loviisa, Kivetty in Aeaenekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Haestholmen. The Haestholmen area is located within the anorogenic Wiborg rapakivi granite batholith, about 1630 million years in age, representing one of the youngest rock formations in Finland. Wiborgite, pyterlite, porphyritic rapakivi granite and even-grained rapakivi granite are the rock types present. 25 bedrock structures have been modelled at the site. Most of them are steeply-dipping fracture zones trending NW-SE and NE-SW, but several sub-horizontal zones, mainly dipping to the N-NE and the SW, are also present. The rock mass between the fracture zones represents what is termed 'intact rock', which is typically hard, unweathered and sparsely fractured. The bedrock structures are generally hydraulically more conductive than the intact rock and their mean transmissivity is 8 x 10 -6 m 2 /s or 1.3 x 10 -6 m 2 /s, depending on how structures are defined. The corresponding mean of the hydraulic conductivity values measured for the intact rock using a 2 m packer interval is 1 x 10 -12 m/s, if a lognormal distribution for all measured values is assumed. A clear decrease in hydraulic conductivity with depth has been found in the intact rock. In addition, the hydraulically conductive fractures seem to be more frequent and their transmissivities higher in the uppermost 100-200 m of the bedrock than at greater depths. The groundwater chemistry reflects the post-glacial history of the island of Haestholmen, which rose from the Baltic Sea some

  5. Final disposal of spent nuclear fuel in Finnish bedrock. Haestholmen site report

    Energy Technology Data Exchange (ETDEWEB)

    Anttila, P. [Fortum Engineering Oy, Vantaa (Finland); Ahokas, H. [Fintact Oy, Helsinki (Finland); Front, K. [VTT Communities and Infrastructure, Espoo (Finland)

    1999-06-01

    Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Haestholmen in Loviisa, Kivetty in Aeaenekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Haestholmen. The Haestholmen area is located within the anorogenic Wiborg rapakivi granite batholith, about 1630 million years in age, representing one of the youngest rock formations in Finland. Wiborgite, pyterlite, porphyritic rapakivi granite and even-grained rapakivi granite are the rock types present. 25 bedrock structures have been modelled at the site. Most of them are steeply-dipping fracture zones trending NW-SE and NE-SW, but several sub-horizontal zones, mainly dipping to the N-NE and the SW, are also present. The rock mass between the fracture zones represents what is termed `intact rock`, which is typically hard, unweathered and sparsely fractured. The bedrock structures are generally hydraulically more conductive than the intact rock and their mean transmissivity is 8 x 10{sup -6} m{sup 2}/s or 1.3 x 10{sup -6} m{sup 2}/s, depending on how structures are defined. The corresponding mean of the hydraulic conductivity values measured for the intact rock using a 2 m packer interval is 1 x 10{sup -12} m/s, if a lognormal distribution for all measured values is assumed. A clear decrease in hydraulic conductivity with depth has been found in the intact rock. In addition, the hydraulically conductive fractures seem to be more frequent and their transmissivities higher in the uppermost 100-200 m of the bedrock than at greater depths. The groundwater chemistry reflects the post-glacial history of the island of Haestholmen, which rose

  6. Final disposal of spent nuclear fuel in Finnish bedrock - Kivetty site report

    Energy Technology Data Exchange (ETDEWEB)

    Anttila, P. [Fortum Engineering Oy, Vantaa (Finland); Ahokas, H.; Front, K. [Fintact Oy (Finland)] [and others

    1999-06-01

    Posiva Oy is studying the Finnish bedrock for the geological disposal of spent nuclear fuel. The study is based on the site selection research programme started originally in 1983. The programme is in accordance with the decision in principle by the Council of State in 1983 and aims at the selection of one site in 2000. Four sites, Haestholmen in Loviisa, Kivetty in Aeaenekoski, Olkiluoto in Eurajoki and Romuvaara in Kuhmo, have been studied in detail. This report summarises the results of the site investigations carried out at Kivetty. The bedrock of Kivetty belongs to the large Svecofennian granitoid complex of central Finland, about 1880 million years in age. The most common rock type is porphyritic granodiorite, which is cut by younger medium-grained granodiorite and porphyritic or even-grained granite. Minor bodies of gabbro, older than the porphyritic granodiorite, are also present. The granitoids show evidence of two deformation phases. Altogether 29 bedrock 'structures' (R-structures) have been modelled at the investigation site, most of them representing steeply dipping fracture zones. The rock mass between the fracture zones represents what is termed 'intact rock', which is typically hard, unweathered and sparsely fractured. The R-structures are generally hydraulically more conductive than the intact rock and their mean transmissivity is 1.3-10{sup -6} m{sup 2}/s. The corresponding mean of the hydraulic conductivity values for the intact rock, measured using a 2 m packer interval is 4*10{sup -11} m{sup 2}/s, if a lognormal distribution for all measured values is assumed. A clear decrease in hydraulic conductivity with depth has been found for the intact rock, and there seems to be a parallel decrease in the transmissivity of structures. In addition, the hydraulically conductive fractures seem to be more frequent and their transmissivities higher in the uppermost 100 - 200 m of the bedrock than at greater depths. The groundwater of

  7. Evaluation and design of drained low-level radioactive disposal sites. Final report

    International Nuclear Information System (INIS)

    Eichholz, G.G.

    1984-12-01

    Low-level disposal in shallow trenches has been the subject of much critical assessment in recent years. Historically most trenches have been located in fairly permeable settings and any liquid waste stored has migrated at rates limited mainly by hydraulic effects and the ion exchange capacity of underlying soil minerals. Attempts to minimize such seepage by choosing sites in very impermeable settings lead to overflow and surface runoff, whenever the trench cap is breached by subsidence or erosion. The work described in this report was directed to an optimum compromise situation where less reliance is placed on cap permanence, any ground seepage is directed and controlled, and the amount of waste leaching that would occur is minimized by keeping the soil surrounding the waste at only residual moisture levels at all times. Measurements have been conducted to determine these residual levels for some representative soils, to estimate the impact on waste migration of mainly unsaturated flow conditions, and to generate a conceptual design of a disposal facility which would provide adequate drainage to keep the waste from being exposed to continuous leaching by standing water. An attempt has also been made to quantify the reduced source terms under such periodic, unsaturated flow conditions, but those tests have not been conclusive to date. For low-permeability soils the waste should be placed about 1 ft. above the saturated layer formed by suction forces immediately above the gravel layer. Since most disposal sites, even in humid regions of the United States, are exposed only to intermittent rainfall and as most trench designs incorporate some gravel base for drainage, the results of this project have broader applications in assessing actual migration conditions in shallow trench disposal sites. Similar considerations may also apply to disposal of hazardous wastes

  8. Final Report: Results of Environmental Site Investigation at Sylvan Grove, Kansas

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M [Argonne National Lab. (ANL), Argonne, IL (United States)

    2014-09-01

    Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina, Kansas (Figure 1.1). From 1954 to 1966, the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility at the northeastern edge of Sylvan Grove. During this time, commercial grain fumigants containing carbon tetrachloride were in common use to preserve grain in storage. In 1998, the Kansas Department of Health and Environment (KDHE) found carbon tetrachloride above the maximum contaminant level (MCL) of 5 μg/L in groundwater from one private well used for livestock and lawn and garden watering. The 1998 KDHE sampling at Sylvan Grove was conducted under the USDA private well sampling program. To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA proposed to conduct an environmental site investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. Argonne National Laboratory, on behalf of the CCC/USDA, developed a work plan (Argonne 2012) for the site investigation and a supplemental work plan for indoor and ambient air sampling (Appendix A). The proposed work was approved by the KDHE (2012a, 2013). The investigations were performed by the Environmental Science Division of Argonne National Laboratory, on behalf of the CCC/USDA. The main activities for the site investigation were conducted in June 2012, and indoor and ambient air sampling was performed in February 2013. This report presents the findings of the investigations at Sylvan Grove.

  9. The SocioEconomic Analysis of Repository Siting (SEARS): Technical description: Final draft

    International Nuclear Information System (INIS)

    1984-11-01

    Socioeconomic impacts must be assessed both for the near term and for the future. One means of addressing the need for the assessment of such impacts has been through the development of the computerized socioeconomic assessment model called the SocioEconomic Analysis of Repository Siting (SEARS) model. The SEARS model was developed for the Battelle Project Management Division. It was refined and adapted from state-of-the-art computerized projection models and thoroughly validated and is now available for use in projecting the likely socioeconomic impacts of a repository facility. This Technical Description is one of six major products that describe the SEARS modeling system. 61 refs., 11 figs., 9 tabs

  10. Corrective Action Investigation Plan for the CNTA Subsurface Sites (CAU Number 443), Revision 1; FINAL

    International Nuclear Information System (INIS)

    1999-01-01

    This Corrective Action Investigation Plan (CAIP) describes the U.S. Department of Energy's (DOE's) planned environmental investigation of the subsurface Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) No. 443. The CNTA is located in Hot Creek Valley in Nye County, Nevada, adjacent to U.S. Highway 6, about 48 kilometers (km) (30 miles[mi]) north of Warm Springs, Nevada. The CNTA was the site of Project Faultless, a nuclear device detonated in the subsurface by the U.S. Atomic Energy Commission (AEC) in January 1968. The purposes of this test were to gauge the seismic effects of a relatively large, high-yield detonation completed in Hot Creek Valley (outside the Nevada Test Site) and to determine the suitability of the site for future large detonations. The yield of the Faultless test was between 200 kilotons and 1 megaton. Two similar tests were planned for the CNTA, but neither of them was completed. Based on the general definition of a corrective action investigation (CAI) from Section IV.14 of the Federal Facility Agreement and Consent Order (FFACO), the purpose of the CAI is ''to gather data sufficient to characterize the nature, extent, and rate of migration or potential rate of migration from releases or discharges of pollutants or contaminants and/or potential releases or discharges from corrective action units identified at the facilities''. For CNTA CAU 443 the concepts developed for the Underground Test Area (UGTA) CAUs will be applied on a limited scale. For the UGTA CAUs, ''the objective of the CAI process is to define boundaries around each UGTA CAU that establish areas that contain water that may be unsafe for domestic and municipal use,'' as stated in Appendix VI of the FFACO (1996). Based on this strategy the CAI for CAU 443 will start with modeling using existing data. New data collection activities are generally contingent upon the results of the modeling and may or may not be part of the CAI. Specific objectives of the CAI ar e as

  11. Hazardous waste incinerator permitting in Texas from inception to operation

    International Nuclear Information System (INIS)

    Simms, M.D.; McDonnell, R.G. III

    1991-01-01

    The regulatory permitting process for hazardous waste incinerators i a long and arduous proposition requiring a well-developed overall strategy. In Texas, RCRA permits for the operation of hazardous waste incinerator facilities are issued through the federally delegated Texas Water Commission (TWC). While the TWC has primacy in the issuance of RCRA permits for hazardous waste incinerators, the Texas Air Control Board (TACB) provides a significant portion of the Part B application review and provides much of the permit language. In addition to dealing with regulatory agencies, RCRA permitting provides by significant public involvement. Often the lack of public support becomes a major roadblock for an incinerator project. In order to establish an effective strategy which addresses the concerns of regulatory agencies and the public, it is important to have an understanding of the steps involved in obtaining a permit. A permit applicant seeking to construct a new hazardous waste incinerator can expect to go through a preapplication meeting with government regulators, a site selection process, file an application, respond to calls for additional technical information from both the TACB and the TWC, defend the application in a hearing, have a recommendation from a TWC hearing examiner and, finally, receive a determination from the TWC's Commissioners. Presuming a favorable response from the Commission, the permittee will be granted a trial burn permit and may proceed with the construction, certification and execution of a trial burn at the facility. Subsequent to publication of the trial burn results and approval by the TWC, the permittee will possess an operational hazardous waste incinerator permit. The paper describes the major steps required to receive an operational permit for a hazardous waste incinerator in the State of Texas. Important issues involved in each step will be discussed including insights gained from recent incinerator permitting efforts

  12. Further development of public participation in the site-selection and approval process of a final repository in Germany

    Energy Technology Data Exchange (ETDEWEB)

    Barth, Regine; Kallenbach-Herbert, Beate [OeEo-Institute e.V., Inst. for Applied Ecology, Darmstadt (Germany); Arens, Georg [Federal Office for Radiation Protection (BfS), Salzgitter (Germany)

    2006-09-15

    This paper reflects the first findings of a current research project funded by the German Federal Office for Radiation Protection and conducted by an interdisciplinary working group of the OEko-Institute. One focus of this project is the systematic analysis of past and existing participatory processes in different nuclear and non-nuclear projects. On the basis of this analysis and a literature review a specific concept for public participation in the site-selection and approval process of a repository for high radioactive waste (HAW repository) in Germany will be derived. The concept shall foster transparency and acceptance. The working group of the OEko-Institute combines long standing research experience and an intimate knowledge of radioactive waste management including political, technical, management and social problems of final disposal on the one hand. On the other hand members play an active role in stakeholder processes of different non-nuclear projects as well as experience with a wide range of participative measures and their impact. This allows an approach which integrates the specific features of radioactive waste disposal with a wider perspective on the demands and opportunities of stakeholder processes. The procedure of site selection for a HAW repository in Germany still has to be specified. The procedure introduced by the 'Committee on a Site Selection Procedure for Repository Sites' (Arbeitskreis Auswahlverfahren Endlagerstandorte - AkEnd) has not been adopted. The Committee had suggested installing a negotiation group to discuss the AkEnd proposals in the so called 'Phase II'. This suggestion could not be followed because not all relevant stakeholders were willing to participate. An internal draft for a federal law implementing main elements of the AkEnd findings was developed by the Ministry for Environment in 2005, but has never been brought to the cabinet. Due to the change of Government in Germany, the next steps still are

  13. Further development of public participation in the site-selection and approval process of a final repository in Germany

    International Nuclear Information System (INIS)

    Barth, Regine; Kallenbach-Herbert, Beate; Arens, Georg

    2006-01-01

    This paper reflects the first findings of a current research project funded by the German Federal Office for Radiation Protection and conducted by an interdisciplinary working group of the OEko-Institute. One focus of this project is the systematic analysis of past and existing participatory processes in different nuclear and non-nuclear projects. On the basis of this analysis and a literature review a specific concept for public participation in the site-selection and approval process of a repository for high radioactive waste (HAW repository) in Germany will be derived. The concept shall foster transparency and acceptance. The working group of the OEko-Institute combines long standing research experience and an intimate knowledge of radioactive waste management including political, technical, management and social problems of final disposal on the one hand. On the other hand members play an active role in stakeholder processes of different non-nuclear projects as well as experience with a wide range of participative measures and their impact. This allows an approach which integrates the specific features of radioactive waste disposal with a wider perspective on the demands and opportunities of stakeholder processes. The procedure of site selection for a HAW repository in Germany still has to be specified. The procedure introduced by the 'Committee on a Site Selection Procedure for Repository Sites' (Arbeitskreis Auswahlverfahren Endlagerstandorte - AkEnd) has not been adopted. The Committee had suggested installing a negotiation group to discuss the AkEnd proposals in the so called 'Phase II'. This suggestion could not be followed because not all relevant stakeholders were willing to participate. An internal draft for a federal law implementing main elements of the AkEnd findings was developed by the Ministry for Environment in 2005, but has never been brought to the cabinet. Due to the change of Government in Germany, the next steps still are under consideration

  14. Siting a municipal solid waste disposal facility, part II: the effects of external criteria on the final decision.

    Science.gov (United States)

    Korucu, M Kemal; Karademir, Aykan

    2014-02-01

    The procedure of a multi-criteria decision analysis supported by the geographic information systems was applied to the site selection process of a planning municipal solid waste management practice based on twelve different scenarios. The scenarios included two different decision tree modes and two different weighting models for three different area requirements. The suitability rankings of the suitable sites obtained from the application of the decision procedure for the scenarios were assessed by a factorial experimental design concerning the effect of some external criteria on the final decision of the site selection process. The external criteria used in the factorial experimental design were defined as "Risk perception and approval of stakeholders" and "Visibility". The effects of the presence of these criteria in the decision trees were evaluated in detail. For a quantitative expression of the differentiations observed in the suitability rankings, the ranking data were subjected to ANOVA test after a normalization process. Then the results of these tests were evaluated by Tukey test to measure the effects of external criteria on the final decision. The results of Tukey tests indicated that the involvement of the external criteria into the decision trees produced statistically meaningful differentiations in the suitability rankings. Since the external criteria could cause considerable external costs during the operation of the disposal facilities, the presence of these criteria in the decision tree in addition to the other criteria related to environmental and legislative requisites could prevent subsequent external costs in the first place.

  15. Cometabolic bioreactor demonstration at the Oak Ridge K-25 Site: Final report

    International Nuclear Information System (INIS)

    Lucero, A.J.; Donaldson, T.L.; Jennings, H.L.; Morris, M.I.; Palumbo, A.V.; Herbes, S.E.

    1995-08-01

    The Oak Ridge National Laboratory (ORNL) conducted a demonstration of cometabolic technology for bioremediation of groundwater contaminated with trichloroethylene (TCE) and other chlorinated solvents. The technology demonstration was located at a seep from the K-1070-C/D Classified Burial Ground at the Oak Ridge K-25 Site. The technology demonstration was designed to evaluate the performance of two different types of cometabolic processes. In both cases, the TCE is cometabolized in the sense that utilization of a different primary substrate is necessary to obtain the simultaneous cometabolism of TCE. Trichloroethylene alone is unable to support growth and maintenance of the microorganisms. Methanotrophic (methane-utilizing) technology was demonstrated first; aromatic-utilizing microorganisms were demonstrated later. The demonstration was based on scaleup of laboratory and bench-scale prototype equipment that was used to establish the technical feasibility of the processes.This report documents the operation of the methanotrophic bioreactor system to treat the seep water at the demonstration site. The initial objectives were to demonstrate stable operation of the bioreactors and associated equipment, including the pretreatment and effluent polishing steps; and evaluate the biodegradation of TCE and other organics in the seep water for the three operating modes--air oxidation pretreatment, steam-stripping pretreatment, and no pretreatment

  16. Department of Energy Site Operator Program. Final report, October 1, 1991--September 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    York Technical College is a two-year public institution accredited by the Commission of Colleges of the Southern Association of Colleges and Schools. York Technical College has been involved with electric vehicles since the late 1980`s. The four major objectives of the Site Operator Program were (1) field test and evaluate electric and hybrid vehicles and related components; (2) define and develop a national infrastructure system including electric charging systems, service/training education programs, utility system impacts and safety standards; (3) increase public awareness regarding environmental benefits, reduced dependency on foreign oil, technology development, and economic impacts; (4) assist local, state and federal agencies and fleet operators in developing electric and hybrid vehicle programs. The primary thrusts of the electric vehicle program at York Technical College, supporting the objectives of the Site Operator program were: (1) public awareness, (2) public education, (3) EV maintenance curriculum development and maintenance training, (4) field data collection, (5) vehicle modification and upgrade, (6) establish electric vehicle partnerships.

  17. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final environmental impact statement. Summary

    International Nuclear Information System (INIS)

    1996-08-01

    This document analyzes the potential environmental consequences related to the Hanford Site Tank Waste Remediation System (TWRS) alternatives for management and disposal of radioactive, hazardous, and mixed waste, and the management and disposal of approximately 1,930 cesium and strontium capsules located at the Hanford Site. This waste is currently or projected to be stored in 177 underground storage tanks and approximately 60 miscellaneous underground storage tanks. This document analyzes the following alternatives for remediating the tank waste: No Action, Long-Term Management, In Situ Fill and Cap, In Situ Vitrification, Ex Situ Intermediate Separations, Ex Situ No Separations, Ex Situ Extensive Separations, Ex Situ/In Situ Combination 1, and Ex Situ/In Situ Combination 2. This document also addresses a Phased Implementation alternative (the DOE and Ecology preferred alternative for remediation of tank waste). Alternatives analyzed for the cesium and strontium capsules include: No Action, Onsite Disposal, Overpack and Ship, and Vitrify with Tank Waste. The DOE and Ecology preferred alternative for the cesium and strontium capsules is the No Action alternative

  18. Lower Columbia River and Estuary Ecosystem Restoration Program Reference Site Study: 2011 Restoration Analysis - FINAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Borde, Amy B.; Cullinan, Valerie I.; Diefenderfer, Heida L.; Thom, Ronald M.; Kaufmann, Ronald M.; Zimmerman, Shon A.; Sagar, Jina; Buenau, Kate E.; Corbett, C.

    2012-05-31

    The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions of the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.

  19. The Bolgary IX settlement – a site of the Ananyino finale in the vicinity of Perm

    Directory of Open Access Journals (Sweden)

    Vasilyeva Anastasia V.

    2015-06-01

    Full Text Available The article presents materials recovered from the Bolgary IX settlement, attributed to the late Ananyino group of sites, discovered in the vicinity of the city of Perm on the left bank of the Kama River. The structures thus found were interpreted by the authors as, presumably, a dwelling (? and a cult building. The pre-Ananyino cult buildings are well known by two hillforts – Zuevy Klychi-1 on the Lower Kama and Argyzh on the Vyatka River. Small clay figurines, arrow heads, spindle whorls, small oblational cups and household ceramics were found within the cult buildings. Household ceramics are represented by some typical late Ananyino vessel forms: mainly bowls with a closed throat, sometimes with profiled pronounced neck. Some vessels have a collar on the rim. Ornamentation of the vessels includes versatile corded, combed and recessed compositions. The Bolgary IX material culture is considered in complex with simultaneous Protasy burial ground, which is located on a nearby promontory and has similar ceramics among the grave goods. This complex of sites (the settlement and the burial ground is dated back to 3rd-2nd centuries BC and is related by the authors to the period of transition from the Ananyino to the Glyadenovo cultures in the Kama River region.

  20. Final Environmental Assessment for solid waste disposal, Nevada Test Site, Nye County, Nevada

    International Nuclear Information System (INIS)

    1995-08-01

    New solid waste regulations require that the existing Nevada Test Site (NTS) municipal landfills, which receive less than 20 tons of waste per day, be permitted or closed by October 9, 1995. In order to be permitted, the existing landfills must meet specific location, groundwater monitoring, design, operation, and closure requirements. The issuance of these regulations has resulted in the need of the Department of Energy (DOE) to provide a practical, cost-effective, environmentally sound means of solid waste disposal at the NTS that is in compliance with all applicable federal, state, and local regulations. The current landfills in Areas 9 and 23 on the Nevada Test Site do not meet design requirements specified in new state and federal regulations. The DOE Nevada Operations Office prepared an environmental assessment (EA) to evaluate the potential impacts of the proposal to modify the Area 23 landfill to comply with the new regulations and to close the Area 9 landfill and reopen it as Construction and Demolition debris landfill. Based on information and analyses presented in the EA, DOE has determined that the proposed action would not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act. Therefore, an environmental impact statement (EIS) is not required. This report contains the Environmental Assessment, as well as the Finding of No Significant Impact (FONSI)

  1. Texas Heart Institute

    Science.gov (United States)

    ... of seminars and conferences. Resources Texas Heart Institute Journal Scientific Publications Library & Learning Resources Resources for Physicians Fellowships & Residencies School of Perfusion Technology THI Spotlight Check out the ...

  2. Molecular Level Control Through Dual Site Participation Using Bimetallic Catalysts - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    d' Itri, Julie, L.; Kovalchuk, Vladimir, I.

    2010-02-08

    The overall goal of this research program was to explore the hypothesis that it is possible to design a bimetallic surface such that each metal catalyzes different elementary reaction steps in an overall reaction pathway. A corollary to this hypothesis is that the different ensemble size requirements for an elementary reaction step can be used to force an elementary reaction step to occur on only one of the metals. The research program involved a combination of materials synthesis, chemical kinetics experiments, spectroscopic studies and computational investigations. The major outcome of this research program was the development and dissemination of the Dual Site Model, for which chlorocarbon reactions in the presence of hydrogen were used as model systems.

  3. Nevada Test Site Area 25. Radiological survey and cleanup project, 1974-1983. Final report

    International Nuclear Information System (INIS)

    McKnight, R.K.; Rosenberry, C.E.; Orcutt, J.A.

    1984-01-01

    This report describes radiological survey, decontamination and decommissioning of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The cleanup was part of the Surplus Facilities Management Program funded by the Department of Energy's Richland Operations Office. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for alpha and beta plus gamma radiation contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 12 figures

  4. Environmentally based siting assessment for synthetic-liquid-fuels facilities. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-01

    A detailed assessment of the major environmental constraints to siting a synthetic fuels industry and the results of that assessment are used to determine on a regional basis the potential for development of such an industry with minimal environmental conflicts. Secondly, the ability to mitigate some of the constraining impacts through alternative institutional arrangements, especially in areas that are judged to have a low development potential is also assessed. Limitations of the study are delineated, but specifically, the study is limited geographically to well-defined boundaries that include the prime coal and oil shale resource areas. The critical factors used in developing the framework are air quality, water availability, socioeconomic capacity, ecological sensitivity, environmental health, and the management of Federally owned lands. (MCW)

  5. Contingency analysis modeling for superfund sites and other sources. Final report

    International Nuclear Information System (INIS)

    Christensen, D.; Kaiser, G.D.

    1993-01-01

    The report provides information on contingency modeling for a wide range of different accidental release scenarios of hazardous air pollutants that might take place at Superfund and other sites. The scenarios are used to illustrate how atmospheric dispersion models, including dense gas models, should be applied. Particular emphasis is made on the input data that is needed for proper applications of models. Flow charts direct the user to specific sections where various scenarios are discussed. A check list of items that should be discussed before running the model is provided. Several examples are provided to specifically show how to apply the models so as to produce a credible analysis for a particular release scenario

  6. Hydraulic containment of low-level radioactive waste disposal sites: [Final technical report

    International Nuclear Information System (INIS)

    Ostendorf, D.W.; Noss, R.R.; Miller, A.B.; Phillips, H.S.

    1987-01-01

    This document describes the use of impermeable barriers for the containment of liquid radioactive wastes at low-level radioactive waste disposal sites. Included are a review of existing barrier systems, assessments of laboratory and field data, and simulations of system performance under humid and arid conditions. Alternatives are identified as the most promising of the existing systems based on retention of irradiated water, field installation feasibility, and response to aggressive permeation. In decreasing order of preference, the favored systems are asphalt slurry, high density polyethylene synthetic liner, polyvinyl chloride synthetic liner, lean portland cement concrete, and compacted bentonite liner. It should be stressed that all five of these alternatives effectively retain irradiated water in the humid and arid simulations. Recommendations on the design and operation of the hydraulic containment system and suggestions on avenues for future research are included. 102 refs., 27 figs., 23 tabs

  7. Characterization of contaminated nuclear sites, facilities and materials: radioisotope and radiopharmaceutical manufacturers and suppliers. Final report

    International Nuclear Information System (INIS)

    1983-01-01

    The Environmental Protection Agency (EPA) is developing environmental protection standards for evaluating the risks and characterizing problems associated with disposal of radioactive wastes arising from decontamination and decommissioning DandD operations. Information on operations conducted at sites authorized to possess radioactive materials for the production and/or distribution of radioisotopes and radiopharmaceuticals was compiled and evaluated. This information was used to project the types, nature, and volumes of wastes which are likely to be generated during decontamination and decommissioning at representative facilities and identifying special problems that may occur. Radioisotope and radiopharmaceutical manufacturers have been grouped together because decommissioning operations will be similar. Nuclear pharmacies were also evaluated because of their increasing numbers and their role as middlemen between manufacturers and users of radiopharmaceuticals. The majority of the radioactive waste will arise from the decontamination of the laboratories, rather than the disposal of components

  8. Prospection and catalogue of sites for geothermal probes in the canton of Jura. Final report

    International Nuclear Information System (INIS)

    Rieben, C.; Adatte, P.

    1996-10-01

    The aim of this report is to establish the different possibilities of using so called 'Earth Probes' in Karstic areas. In Switzerland, most of the existing vertical Earth Probes are located on the plateau. In calcareous regions, whether in the Jura or in the Prealps, this type of equipment has not yet been used much because of its interference with the Karstic aquifers which bear important drinking water resources. However, an important demand exists in these areas, as can be witnessed in the canton of Jura for example where some 300 vertical probes have already been drilled. In 1996, almost 10% of the licence's request for heating installations involved Geothermic Probes. Unfortunately, in the absence of a coherent management policy, both local and regional water resources are being endangered by the multiplication of these Geothermic Probes. It would therefore appear to be necessary to elaborate a site implantation assessment methodology specific to limestone areas. Such an assessment methodology should not only further groundwater conservation, but also promote Geothermy in the future. This multicriteria approach should integrate Karstic aquifer specificities by taking into account both the above ground factors but also the underground parameters. The result of the application of this particular approach in the canton Jura is shown on a 1:50'000 scale map where potential Earth Probe sites are localised and on a 1:5'000 scale land registry map of the City of Delement. In comparison with the current unmanaged situation, this approach has the effect of restricting the use of Earth Probes, as it would be forbid their use in eight townships. However, it must be underlined that 97% of the Jura population lives in built-up areas where the unrestricted exploitation of Geothermy is permitted. The application of this particular approach as regards to other Karstic areas would enable a wide expansion of implantation possibilities of this type of equipment. (author) figs

  9. FInal Report: Site Investigation Results, 2009-2011, at Inman, Kansas

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Sciences Div.

    2015-05-01

    The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at the southern edge of the city of Inman, Kansas, from 1954 to 1965. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In 1997, trace to low levels of carbon tetrachloride (below the maximum contamination level [MCL] of 5.0 μg/L) were detected in three private wells near the former grain storage facility at Inman, as part of a statewide USDA private well sampling program that was implemented by the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. No public water supply wells were identified in 1998 by the KDHE within 1 mi of the town. Carbon tetrachloride is the contaminant of primary concern at sites associated with grain storage operations. To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA agreed to conduct investigations at Inman. The investigations were performed by the Environmental Science Division of Argonne National Laboratory in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA. Argonne, on behalf of the CCC/USDA, developed a Work Plan (Argonne 2007) and subsequently a Summary of Investigation Results and Proposed Work Plan (Appendix A) for a phased site investigation. The proposed work was approved by the KDHE (2007, 2011). The investigations were conducted from November 2009 to September 2011, as proposed in the two work plans. This report presents the findings of the 2009-2011 investigations at Inman.

  10. Science To Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards; FINAL

    International Nuclear Information System (INIS)

    Bredt, Paul R; Brockman, Fred J; Grate, Jay W; Hess, Nancy J; Meyer, Philip D; Murray, Christopher J; Pfund, David M; Su, Yali; Thornton, Edward C; Weber, William J; Zachara, John M

    2001-01-01

    Pacific Northwest National Laboratory (PNNL) was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, nine in fiscal year 1998, seven in fiscal year 1999, and five in fiscal year 2000. All of the fiscal year 1996 award projects have published final reports. The 1997 and 1998 award projects have been completed or are nearing completion. Final reports for these awards will be published, so their annual updates will not be included in this document. This section summarizes how each of the 1999 and 2000 grants address significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. The 1999 and 2000 EMSP awards at PNNL are focused primarily in two areas: Tank Waste Remediation, and Soil and Groundwater Cleanup

  11. The procedure of alternative site selection within the report of the study group on the radioactive waste final repository selection process (AKEnd)

    International Nuclear Information System (INIS)

    Nies, A.

    2005-01-01

    The study group on the selection procedures of radioactive waste final repository sites has presented the report in December 2002. The author dicusses the consequences of this report with respect to the site selection focussing on two topics: the serach for the best possible site and the prevention of prejudices

  12. Final disposal of spent fuel in the Finnish bedrock. Scope and requirements for site-specific safety analysis

    International Nuclear Information System (INIS)

    1996-12-01

    The report is a summary of the research conducted in the period 1993 to 1996 into safety of spent fuel final disposal. The principal goal of the research in this period, as set in 1993, was to develop a strategy for site-specific safety analysis. At the same time efforts were to be continued to gather data and validate the technical approach for the analysis. The work aimed at having the data needed for the analysis available at the end of year 1998. A safety assessment update, TILA-96, prepared by VTT Energy, is published as a separate report. The assessment is based on the TVO-92 safety analysis, but takes into account the knowledge acquired after 1992 on safety aspects of the disposal system and the data gathered from the site investigations made by TVO and from the beginning of 1996, by Posiva. Since the site investigations are still ongoing and much of the data gathered still pending interpretation, only limited amount of new site-specific information has been available for the present assessment. (172 refs.)

  13. A pilot study for the extraction and treatment of groundwater from a manufactured gas plant site. Final report

    International Nuclear Information System (INIS)

    1997-12-01

    This report describes a pilot study involving treatment of contaminated groundwater at a former manufactured gas plant site on the eastern seaboard of the US. The work was performed in order to provide the design basis for a full-scale groundwater extraction and treatment system at the site, as well as to develop a generic approach to selection of groundwater treatment sequences at other MGP sites. It included three main components: hydrogeologic investigations, bench-scale treatability studies, and pilot-scale treatability studies. Technologies evaluated in bench-scale work included gravity settling, filtration, and dissolved air flotation (DAF) for primary treatment of nonaqueous phase materials; biological degradation, air stripping, and carbon adsorption for secondary treatment of dissolved organics; and carbon adsorption as tertiary treatment of remaining dissolved contaminants. Pilot-scale studies focused on collecting system performance data fore three distinct levels of contamination. Two treatment trains were evaluated. One consisted of DAF, fluidized-bed biotreatment, and filtration plus carbon adsorption; the other used the same steps except to substitute air stripping for fluidized bed treatment. The final effluents produced by both treatment sequences were similar and demonstrated complete treatment of the groundwater. Besides detailing system design and performance for the treatability studies, the report includes an analysis of groundwater treatment applications to MGP sites in general, including a discussion of capital and operating costs

  14. Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-04-14

    The proposed DOE action considered in this environmental impact statement (EIS) is to implement appropriate processes for the safe and efficient management of spent nuclear fuel and targets at the Savannah River Site (SRS) in Aiken County, South Carolina, including placing these materials in forms suitable for ultimate disposition. Options to treat, package, and store this material are discussed. The material included in this EIS consists of approximately 68 metric tons heavy metal (MTHM) of spent nuclear fuel 20 MTHM of aluminum-based spent nuclear fuel at SRS, as much as 28 MTHM of aluminum-clad spent nuclear fuel from foreign and domestic research reactors to be shipped to SRS through 2035, and 20 MTHM of stainless-steel or zirconium-clad spent nuclear fuel and some Americium/Curium Targets stored at SRS. Alternatives considered in this EIS encompass a range of new packaging, new processing, and conventional processing technologies, as well as the No Action Alternative. A preferred alternative is identified in which DOE would prepare about 97% by volume (about 60% by mass) of the aluminum-based fuel for disposition using a melt and dilute treatment process. The remaining 3% by volume (about 40% by mass) would be managed using chemical separation. Impacts are assessed primarily in the areas of water resources, air resources, public and worker health, waste management, socioeconomic, and cumulative impacts.

  15. Phase I decontamination of the J.C. Haynes site, Newark, Ohio. Final report

    International Nuclear Information System (INIS)

    Emswiler, T.R.

    1985-11-01

    Phase I consisted of the primary decontamination, packaging, and shipment of all 241 Am-contaminated gloveboxes, vent system, and miscellaneous waste items located in the laboratory restricted area in the J.C. Haynes house. The primary goals of Phase I were to locate and account for a major quantity of 241 Am which was unaccounted for and to remove all radioactive materials and contamination posing an imminent hazard to public health and safety. All Phase I operations were conducted under a Quality Assurance (QA) Program Plan and QA procedures written specifically for this program. In addition, certain generic Battelle QA procedures were used for routine tasks. All operations were conducted under strict health physics supervision and procedures. Cognizant ORAU and US Nuclear Regulatory Commission (NRC) personnel were on site during the entire Phase I operation and provided support and approval in the daily operations. All staff members had participated in previous decontamination and decommissioning programs involving transuranic waste and completed Phase I in a well controlled, timely, and safe manner

  16. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site. Final [report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    Surface and subsurface soil cleanup protocols for the Gunnison, Colorado, processing sits are summarized as follows: In accordance with EPA-promulgated land cleanup standards (40 CFR 192), in situ Ra-226 is to be cleaned up based on bulk concentrations not exceeding 5 and 15 pCi/g in 15-cm surface and subsurface depth increments, averaged over 100-m{sup 2} grid blocks, where the parent Ra-226 concentrations are greater than, or in secular equilibrium with, the Th-230 parent. A bulk interpretation of these EPA standards has been accepted by the Nuclear Regulatory Commission (NRC), and while the concentration of the finer-sized soil fraction less than a No. 4 mesh sieve contains the higher concentration of radioactivity, the bulk approach in effect integrates the total sample radioactivity over the entire sample mass. In locations where Th-230 has differentially migrated in subsoil relative to Ra-226, a Th-230 cleanup protocol has been developed in accordance with Supplemental Standard provisions of 40 CFR 192 for NRC/Colorado Department of Health (CDH) approval for timely implementation. Detailed elements of the protocol are contained in Appendix A, Generic Protocol from Thorium-230 Cleanup/Verification at UMTRA Project Processing Sites. The cleanup of other radionuclides or nonradiological hazards that pose a significant threat to the public and the environment will be determined and implemented in accordance with pathway analysis to assess impacts and the implications of ALARA specified in 40 CFR 192 relative to supplemental standards.

  17. Study of hydrological and geochemical data on materials for the final cover of subsurface storage sites

    International Nuclear Information System (INIS)

    Sauter, M.M.; Barres, M.; Faby, J.

    1987-01-01

    The European Research program includes studies on highly watertight materials likely to sait the final cover of low-level and intermediate-level waste disposal. The experimental equipment is composed of a 26 sq. m collector placed on an inclined plane, just below the material to be tested and connected by means of a gutter with a measuring room where the infiltration waters flow rate is steadily measured. On the surface of the tumulus, a 300 sq.m inclined plane permits the measure of the running off water. The recording raingauge completes the device. Water vapour pressures are measured at different depths within the material. Total watercontents are registered along vertical profils using a special neutron logging tool. Numerous physico-chemical measures are carried out on the infiltration and running off waters: pH, Eh, temperature, dissolved oxygen, conductivity, turbidity and major anions and cations. Two materials have been tested with this device: - weathered schists; Compacted clay. The first material showed that, on average over the six months period of measurements, the overall rainfall brokedown into 11% running waters, 13% infiltration and 76% evaporation because infiltration accounts for a large part of rainfall. It resulted in a complete saturation of the material during certain periods of the year. Humidity measurements performed at different places pointed out large heterogeneities inside the material. It is worth noting that, despite some problems due to calibration, the whole instrumentation located in the measuring room worked rather well and permitted to demonstate the bad qualities of the material. The second material was subsequently covered by a 20 cm thick layer made of a mixture of sand in order to regularize water infiltration under the soil vegetation constituted by a special grass growing

  18. Energy conserving site design: Greenbrier case study, Chesapeake, Virginia. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-04-01

    A specific case study of project planning for energy conservation for a major planned unit development at the 3000-acre Greenbrier development site in Chesapeake, Virginia, is summarized. The research suggests that very considerable reductions in energy conservation can be achieved within the confines of private-sector land development and residential construction with increased incremental costs of $200.00 to $3150.00 per dwelling unit. It is hypothesized that energy consumption at Greenbrier can be reduced by one-half with an average annual savings of 21,275 kWh per residential unit, using state-of-the-art technology with careful planning and control. This represents an annual savings $750.00 per unit at the current utility rate of 3.5 cents per kWh. These savings can be achieved through reduction in heating and cooling loads and application of more-efficient heating and cooling of the remaining loads. The reduction in loads are achieved by redesign of the land plan to include a higher percentage of south-facing lots, use of vegetation to modify microclimate, decreases in air infiltration, the use of 2 x 6 framing, better insulation, and the use of an insulated slab-on-grade foundation. Further energy savings can be expected by increased efficiencies in mechanical systems used for space heating and cooling and domestic hot water. When applied to the single-family portion of Greenbrier, containing 541 dwelling units, these options reduce the total end-use energy consumption 54.7%. This reduction represents an annual savings of $432,800.00 for an initial capital investment of $1.7 million.

  19. Final Site-Wide Environmental Impact Statement for the Y-12 National Security Complex

    International Nuclear Information System (INIS)

    2001-01-01

    The National Nuclear Security Administration (NNSA) a separately organized agency within the U.S. Department of Energy (DOE) is responsible for providing the Nation with nuclear weapons and ensuring that those nuclear weapons remain safe, secure, and reliable. As one of the DOE major production facilities, the Y-12 National Security Complex has been DOE's primary site for enriched uranium processing and storage, and one of the manufacturing facilities for maintaining the U.S. nuclear weapons stockpile. In response to the end of the Cold War and changes in the world's political regimes, the emphasis of the U.S. weapons program has shifted dramatically over the past few years from developing and producing new weapons to dismantlement and maintenance of a smaller, enduring stockpile. The ''Stockpile Stewardship and Management Programmatic Environmental Impact Statement'' [SSM PEIS], DOE/EIS-0236, issued in September 1996, evaluated alternatives for maintaining the safety and reliability of the nuclear weapons stockpile without underground nuclear testing or production of new-design weapons. In the SSM PEIS Record of Decision (ROD), DOE decided to maintain the national security missions at the Y-12 National Security Complex, but to downsize Y-12 consistent with reduced requirements. These national security missions include (1) maintaining the capability and capacity to fabricate secondaries, limited life components, and case parts for nuclear response; (2) evaluating components and subsystems returned from the stockpile; (3) storing enriched uranium that is designated for national security purposes; (4) storing depleted uranium and lithium parts; (5) dismantling nuclear weapons secondaries returned from the stockpile; (6) processing uranium and lithium (which includes chemical recovery, purification, and conversion of enriched uranium and lithium to a form suitable for long-term storage and/or further use); and (7) providing support to weapons laboratories. During the

  20. Nuclear Waste Risk Perceptions and Attitudes in Siting a Final Repository for Spent Nuclear Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Sjoeberg, Lennart [Stockholm School of Economics (Sweden). Center for Risk Research

    2006-09-15

    The paper does the following: Describes the time trends between 2001 and 2005 in terms of policy intention, perceived risk, trust and attitude Analyzes the relationships between policy attitude - the major dependent variable - and the explanatory variables of perceived risk, trust and attitude. Determines whether policy attitude variation across time, municipalities and genders can be accounted for by variation in perceived risk, trust and attitude. Random samples of 2000 persons living in Oesthammar and Oskarshamn were approached with a mailed questionnaire in 2005 (as was done in 2005). After two reminders, 888 had returned filled out questionnaires, yielding a total response rate of 50 percent, taking into account that some persons had moved without giving a forwarding address to the post office, and that some were unable to answer due to illness or old age. (1). There was a substantially more positive attitude to a local SNF repository in 2005 than in 2001, after an intervening period of phase 2 site investigation. This was true for men and women, both municipalities and with all the response measures analyzed. Men were more positive than women, and had developed more strongly in the positive direction than women had. The attitude in Oskarshamn was somewhat more positive than in Oesthammar. (2). Policy intention was well accounted for by the explanatory variables used here, close to 64 percent of the variance. The most important explanatory variables were epistemic trust, attitude to the repository and social trust, in that order. The differences among these three variables were small with regard to explanatory power. (3) Variation in policy attitude across time, municipalities and gender was reduced in an analysis of covariance with risk, trust and attitude as controlling factors. Hence, these factors explain a large fraction of the variation in policy attitude as observed here. Yet, the time trend was not fully explained and gender variability remained to

  1. Nuclear Waste Risk Perceptions and Attitudes in Siting a Final Repository for Spent Nuclear Fuel

    International Nuclear Information System (INIS)

    Sjoeberg, Lennart

    2006-01-01

    The paper does the following: Describes the time trends between 2001 and 2005 in terms of policy intention, perceived risk, trust and attitude Analyzes the relationships between policy attitude - the major dependent variable - and the explanatory variables of perceived risk, trust and attitude. Determines whether policy attitude variation across time, municipalities and genders can be accounted for by variation in perceived risk, trust and attitude. Random samples of 2000 persons living in Oesthammar and Oskarshamn were approached with a mailed questionnaire in 2005 (as was done in 2005). After two reminders, 888 had returned filled out questionnaires, yielding a total response rate of 50 percent, taking into account that some persons had moved without giving a forwarding address to the post office, and that some were unable to answer due to illness or old age. (1). There was a substantially more positive attitude to a local SNF repository in 2005 than in 2001, after an intervening period of phase 2 site investigation. This was true for men and women, both municipalities and with all the response measures analyzed. Men were more positive than women, and had developed more strongly in the positive direction than women had. The attitude in Oskarshamn was somewhat more positive than in Oesthammar. (2). Policy intention was well accounted for by the explanatory variables used here, close to 64 percent of the variance. The most important explanatory variables were epistemic trust, attitude to the repository and social trust, in that order. The differences among these three variables were small with regard to explanatory power. (3) Variation in policy attitude across time, municipalities and gender was reduced in an analysis of covariance with risk, trust and attitude as controlling factors. Hence, these factors explain a large fraction of the variation in policy attitude as observed here. Yet, the time trend was not fully explained and gender variability remained to

  2. U.S. DOE Geopressured/Geothermal Program: Final report on well plug and abandonment operations and well site restoration, Louisiana and Texas wells

    Energy Technology Data Exchange (ETDEWEB)

    None

    1994-08-30

    Some of the critical operations conducted during the plugging and abandonment of the three producing wells of the U.S. DOE GEOPRESSURED/GEOTHERL PROGRAM were witnessed by D-O-R Engineering personnel. All operations witnessed by D-O-R personnel were in compliance with the respective state regulations and were conducted as per D-O-R's recommendations to the Department of Energy and their prime contractor, EG&G Idaho. It is our belief that competent cement plugs were left in all three wells. The following describes the work actually witnessed by D-O-R personnel.

  3. Hurricane Rita Aerial Photography: High-Resolution Imagery of the Texas and Louisiana Gulf Coast After Landfall

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The imagery posted on this site is of the Texas and Louisiana Gulf Coast after Hurricane Rita made landfall. The regions photographed range from San Luis Pass, Texas...

  4. Microbial occurrence in bentonite-based buffer materials of a final disposal site for low level radioactive waste in Taiwan

    International Nuclear Information System (INIS)

    Chou Fongin; Chen Tzungyuang; Li Chiachin; Wen Hsiaowei

    2011-01-01

    This research addresses the potential of microbial implications in bentonite for use as a buffer and backfill material in final disposal site for low-level radioactive waste (LLRW) in Taiwan, where has a special island-type climate. Microbe activities naturally present in this site were analyzed, and buffer materials (BM) consisted of 100%, 70% or 50% bentonite were prepared for laboratory studies. A total of 39 microbial strains were isolated, and the predominant strains included four bacterial, one yeast and four fungal strains. Growth inhibition was not detected in any tested strain cultured in a radiation field with a dose rate of 0.2 Gy/h. Most of the isolated strains grew under a dose rate of 1.4 Gy/h. The D 10 values of the tested strains ranged from 0.16 to 2.05 kGy. The mycelia of tested fungal strains could spread over 5 cm during six months of inoculation in BM. The spreading activity of the tested bacteria was less than that of the fungi. Moreover, biofilms were observed on the surfaces of the BM. Since a large and diverse population of microbes is present in Taiwan, microbes may contribute to the mobilization of radionuclides in the disposal site. (author)

  5. Texas motorcycle crash countermeasure workshop.

    Science.gov (United States)

    2013-06-01

    The Texas Department of Transportation (TxDOT) contracted with the Texas A&M : Transportation Institute (TTI) to develop a 5-year strategic plan for improving motorcycle safety : in the State of Texas. The Texas Strategic Action Plan for Motorcycl...

  6. FINAL DFIRM DATABASE, LIMESTONE COUNTY, TEXAS, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — The Digital Flood Insurance Rate Map (DFIRM) Database depicts flood risk information and supporting data used to develop the risk data. The primary risk...

  7. Final Status Survey Report for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201, Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    Gwin, Jeremy; Frenette, Douglas

    2010-01-01

    This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 - Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values and corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or ''clean,'' building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, ''Final Status Survey Plan for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201'') was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room into one

  8. Water-quality assessment of the Rio Grande Valley, Colorado, New Mexico, and Texas; occurrence and distribution of selected pesticides and nutrients at selected surface-water sites in the Mesilla Valley, 1994-95

    Science.gov (United States)

    Healy, D.F.

    1996-01-01

    The Rio Grande Valley study unit of the U.S. Geological Survey National Water-Quality Assessment Program conducted a two-phase synoptic study of the occurrence and distribution of pesticides and nutrients in the surface water of the Mesilla Valley, New Mexico and Texas. Phase one, conducted in April-May 1994 during the high-flow irrigation season, consisted of a 6-week time- series sampling event during which 17 water-column samples were collected at 3 main-stem sites on the Rio Grande and a synoptic irrigation-run sampling event during which 19 water-column samples were collected at 7 main-stem sites, 10 drain sites, and 2 sites at the discharges of wastewater-treatment plants. Three samples are included in both the time-series and irrigation-run events. Phase two, conducted in January 1995 during the low-flow non-irrigation season, consisted of a non-irrigation synoptic sampling event during which 18 water-column samples were collected at seven main-stem sites, nine drain sites, and two sites at the discharges of wastewater-treatment plants and a bed- material sampling event during which 6 bed-material samples were collected at six sites near the mouths of drains that discharge to the Rio Grande. The 51 water-column samples were analyzed for 78 pesticides and metabolites and 8 nutrients along with other constituents. The six bed-material samples were analyzed for 21 pesticides and metabolites, gross polychlorinated biphenyls, and gross polychlorinated naphthalenes. The presence of dissolved pesticides in the surface water of the Mesilla Valley is erratic. A total of 100 detections of 17 different pesticides were detected in 44 of the water-column samples. As many as 38 percent of these detections may be attributed to pesticide use upstream from the valley or to nonagricultural pesticide use within the valley. There were 29 detections of 10 different pesticides in 17 samples during the irrigation run and 41 detections of 13 pesticides in 16 samples during the non

  9. Wind/solar resource in Texas

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, V.; Starcher, K.; Gaines, H. [West Texas A& M Univ., Canyon, TX (United States)

    1997-12-31

    Data are being collected at 17 sites to delineate a baseline for the wind and solar resource across Texas. Wind data are being collected at 10, 25, and 40 m (in some cases at 50 m) to determine wind shear and power at hub heights of large turbines. Many of the sites are located in areas of predicted terrain enhancement. The typical day in a month for power and wind turbine output was calculated for selected sites and combination of sites; distributed systems. Major result to date is that there is the possibility of load matching in South Texas during the summer months, even though the average values by month indicate a low wind potential.

  10. Plant cover, soil temperature, freeze, water stress, and evapotranspiration conditions. [Lower Rio Grande Valley Test Site: Weslaco, Texas; Falco Reservoir and the Gulf of Mexico

    Science.gov (United States)

    Wiegand, C. L.; Nixon, P. R.; Gausman, H. W.; Namken, L. N.; Leamer, R. W.; Richardson, A. J. (Principal Investigator)

    1980-01-01

    The author has identified the following significant results. HCMM day/night coverage 12 hours apart cannot be obtained at 26 deg N latitude; nor have any pairs 36 hours apart been obtained. A day-IR scene and a night scene for two different dates were analyzed. A profile across the test site for the same latitude shows that the two profiles are near mirror images of each other over land surfaces and that the temperature of two large water bodies, Falcon Reservoir and the Gulf of Mexico, are nearly identical on two dates. During the time interval between overpasses, the vegetative cover remained static due to winter dormancy. The data suggest that day/night temperature differences measured weeks apart may yield meaningful information about the contrast between daytime maximum and nighttime minimum temperatures for a given site.

  11. Texas freight 2055 roundtable.

    Science.gov (United States)

    2016-03-01

    Participants were welcomed to the Roundtable discussion and to the Dallas/Fort Worth region by : Mr. Michael Morris (Director of Transportation, North Central Texas Council of Governments : (NCTCOG)). Mr. Morris began his remarks by noting the import...

  12. Texas' forests, 2008

    Science.gov (United States)

    James W. Bentley; Consuelo Brandeis; Jason A. Cooper; Christopher M. Oswalt; Sonja N. Oswalt; KaDonna Randolph

    2014-01-01

    This bulletin describes forest resources of the State of Texas at the time of the 2008 forest inventory. This bulletin addresses forest area, volume, growth, removals, mortality, forest health, timber product output, and the economy of the forest sector.

  13. Sylvatic trichinellosis in Texas

    Directory of Open Access Journals (Sweden)

    Pence D.B.

    2001-06-01

    Full Text Available There are no published reports of domestic or sylvatic trichinellosis in Texas. The aim of the present survey was to determine the presence of Trichinella species in selected representative species of potential wildlife reservoirs in southern Texas. In 1998-99, tongues of 211 wild mammals were collected in southern Texas: 154 coyotes (Canis latrans, three bobcats (Lynx rufus, 32 racoons (Procyon lotor, 1 3 opossum (Didelphis marsupialis, four ocelots (Leopardus pardalis and five wild boars (Sus scrofa. Presence of Trichinella sp. larvae was investigated by artificial digestion and larvae of positive samples were identified at the species level by a multiple-polymerase chain reaction analysis. Nine (5.8 % coyotes had trichinellosis ; in the muscles of seven of these coyotes, the larvae were identified as Trichinella murrelli. This is the first report of sylvatic trichinellosis in Texas.

  14. Changes in competence of public authorities in connection with final storage pursuant to the omnibus law on site selection

    International Nuclear Information System (INIS)

    Keienburg, Bettina

    2012-01-01

    The omnibus law on site finding and selection for a repository for radioactive waste generating heat, and with amendments to other laws, of June 13, 2012 is to reshuffle fundamentally the competences of public authorities for final storage. The federal government is to assume more responsibilities from former federal state competences. Moreover, most of the existing competences of the Federal Office for Radiation Protection are to be transferred to a federal agency yet to be founded, which is called Federal Office for Nuclear Safety in the present draft legislation. The Federal Office for Radiation Protection will only retain its responsibility as project agent for repositories, and that only in the phases of site exploration and licensing. Afterwards, the duty of final storage in the draft legislation is transferred to a 3rd party. Again in the version of the draft legislation, and unlike present regulations, this 3rd party may only be a company whose sole owner is the federal government, which also is to strengthen the influence of the federal government under aspects of company law. Legislative efforts seeking to strengthen the federal government and its competences by assigning licensing duties for repositories to federal agencies are understandable under feasibility aspects and may even be in the emotional interest of the states and their competent representatives in public authorities who, merely because their work is connected with the disputed topic of final storage, often face attacks and accusations by the public. Nevertheless, the transfer to federal agencies of administrative duties is subject to constitutional limits which must be observed. These constitutional aspects are highlighted in the publication. It is left to the reader to assess the meaningfulness of establishing another independent high-level federal agency in the area of responsibility of the Federal Ministry of the Environment (BMU), i.e. a Federal Office for Nuclear Safety, alongside the

  15. Typhus in Texas

    Centers for Disease Control (CDC) Podcasts

    2017-07-06

    Dr. Kristy Murray, an associate professor in pediatrics and assistant dean of the National School of Tropical Medicine at Baylor College of Medicine and Texas Children’s Hospital, discusses increased cases of typhus in southern Texas.  Created: 7/6/2017 by National Center for Emerging and Zoonotic Infectious Diseases (NCEZID).   Date Released: 7/6/2017.

  16. Remedial Action Plan and Site Design for stabilization of the inactive Uranium Mill Tailings sites at Slick Rock, Colorado: Appendix C to Attachment 3, Calculations. Final

    International Nuclear Information System (INIS)

    1995-09-01

    This volume contains calculations for: Slick Rock processing sites background ground water quality; Slick Rock processing sites lysimeter water quality; Slick Rock processing sites on-site and downgradient ground water quality; Slick Rock disposal site background water quality; Burro Canyon disposal site, Slick Rock, Colorado, average hydraulic gradients and average liner ground water velocities in the upper, middle, and lower sandstone units of the Burro Canyon formation; Slick Rock--Burro Canyon disposal site, Burro Canyon pumping and slug tests--analyses; water balance and surface contours--Burro Canyon disposal cell; and analytical calculation of drawdown in a hypothetical well completed in the upper sandstone unit of the Burro Canyon formation

  17. The procedure of alternative site selection within the report of the study group on the radioactive waste final repository selection process (AKEnd)

    International Nuclear Information System (INIS)

    Brenner, M.

    2005-01-01

    The paper discusses the results of the report of the study group on the radioactive waste final repository selection process with respect to the alternative site selection procedure. Key points of the report are the long-term safety, the alternativity of sites and the concept of one repository. The critique on this report is focussed on the topics site selection and licensing procedures, civil participation, the factor time and the question of cost

  18. Geohydrologic site characterization of the municipal solid waste landfill facility, US Army Air Defense Artillery Center and Fort Bliss, El Paso County, Texas

    Science.gov (United States)

    Abeyta, Cynthia G.

    1996-01-01

    Geohydrologic conditions of the Municipal Solid Waste Landfill Facility (MSWLF) on the U.S. Army Air Defense Artillery Center and Fort Bliss, El Paso County, Texas, were evaluated by the U.S. Geological Survey in cooperation with the U.S. Army. The 106.03-acre MSWLF has been in operation since January 1974. The landfill contains household refuse, Post solid wastes, bulky items, grass and tree trimmings from family housing, refuse from litter cans, construction debris, classified waste (dry), dead animals, asbestos, and empty oil cans. The MSWLF, located about 1,200 feet east of the nearest occupied structure, is estimated to receive an average of approximately 56 tons of municipal solid waste per day and, at a fill rate of 1-4 acres per year, is expected to reach its capacity by the year 2004. The MSWLF is located in the Hueco Bolson, 4 miles east of the Franklin Mountains. Elevations at the MSWLF range from 3,907 to 3,937 feet above sea level. The climate at the MSWLF and vicinity is arid continental, characterized by an abundance of sunny days, high summer temperatures, relatively cool winters typical of arid areas, scanty rainfall, and very low humidity throughout the year. Average annual temperature near the MSWLF and vicinity is 63.3 degrees Fahrenheit and annual precipitation is 7.8 inches. Potential evaporation in the El Paso area was estimated to be 65 inches per year. Soils at and adjacent to the MSWLF are nearly level to gently sloping, have a fine sandy loam subsoil, and are moderately deep over caliche. The MSWLF is underlain by Hueco Bolson deposits of Tertiary age and typically are composed of unconsolidated to slightly consolidated interbedded sands, clay, silt, gravel, and caliche. Individual beds are not well defined and range in thickness from a fraction of an inch to about 100 feet. The primary source of ground water in the MSWLF area is in the deposits of the Hueco Bolson. A relatively thick vadose zone of approximately 300 feet overlies the

  19. Installation restoration program site investigation. Gulfport Field Training Site, Mississippi Air National Guard Gulfport-Biloxi Regional Airport Gulfport, Mississippi. Volume 2. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-12-01

    Site Investigation Report, Volume: 2. A Site Investigation was performed at 3 sites at the Combat Readiness Training Center, Gulfport-Bolixi. The 3 sites investigated are the: Former Fire Training Area (Site 1), the Former JP-4 Bulk Storage Area, Mill Road (Site 2), and the Motor Pool Above-Ground Diesel Fuel Storage Tank Area (Site 3). The findings of this investigation recommended further investigation at the Fire Training Area and the JP-4 Bulk Storage Tank. At Site 3 the levels of contamination did not represent a risk to human health or the environment; therefore, no further action was recommended. Volume two of this report consisted of the following Appendixes: Site Photographs (A), Well Inventory (B), Boring Logs (C), CSL Technical Memorandum (D), Data Review and Validation (E), GPS Memorandum (F), Level C Analytical Data Summary Tables (G), Slug Test (H), Special-Status Species (I), and Representative Species of Less Mobile Fish and Wildlife (J).

  20. Formerly utilized MED/AEC Sites Remedial Action Program. Radiological survey of the Pennsylvania Railroad Landfill Site, Burrell Township, Pennsylvnia. Final Report

    International Nuclear Information System (INIS)

    1979-02-01

    A radiological survey was conducted at the Pennsylvania Railroad Landfill Site in Burrell Township, Pennsylvania. In 1956 and 1957, approximately 11,600 tons of radioactive material was dumped at this site and was apparently scattered over an area of loss than 10 acres. The survey included measurement of the following: external gamma radiation at 1 m above the surface and at the surface throughout the site; beta--gamma dose rates at 1 cm from the surface throughout the site; concentrations of 226 Ra and 238 U in surface and subsurface soil on the site; concentrations of 210 Pb, 226 Ra, 230 Th, and 238 U in subsurface water on the site and in surface water on and near the site; and the extent of atmospheric transport of 222 Rn and progeny from the site. The general location of the residues transported to the site, except possibly small, scattered quantities of materials, was determined from the survey. In some areas on the site, beta--gamma dose rates of 1 cm from the surface were above pertinent guidelines.Analyses of sediment from water samples taken from drainage areas near the site indicate that some radioactive material is being carried from the site by surface run-off. Results of this survey indicate that there is no significant atmospheric transport of 222 Rn from the site

  1. Remedial action plan and site design for stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Final report, Appendixes to attachment 3

    International Nuclear Information System (INIS)

    1994-06-01

    This document contains supporting appendices to attachment 3 for the remedial action and site stabilization plan for Maybell, Colorado UMTRA site. Appendix A includes the Hydrological Services Calculations and Appendix B contains Ground Water Quality by Location data

  2. Conference report: 2012 Repository Symposium. Final storage in Germany. New start - ways and consequences of the site selection procedure

    International Nuclear Information System (INIS)

    Kettler, John

    2012-01-01

    The Aachen Institute for Nuclear Training invited participants to the 3-day '2012 Repository Symposium - Final Storage in Germany' held in Bonn. The subtitle of the event, 'New Start - Ways and Consequences of the Site Selection Procedure,' expressed the organizers' summary that the Repository Finding Act currently under discussion did not give rise to any expectation of a repository for high-level radioactive waste before 2080. The symposium was attended by more than 120 persons from Germany and abroad. They discussed the basic elements of the site selection procedure and its consequences on the basis of the draft so far known to the public. While extensive public participation is envisaged for the stage of finding a repository, this does not apply to the draft legislation in the same way. The legal determinations are negotiated in a small circle by the political parties and the state governments. Michael Sailer (Oeko-Institut e.V.) holds that agreement on a repository finding act is urgent. Prof. Dr. Bruno Thomauske (RWTH Aachen) arrives at the conclusion mentioned above, that no repository for high-level radioactive waste can start operation before 2080 on the basis of the Repository Finding Act. Dr. Bettina Keienburg, attorney at law, in her paper drew attention to the points of dispute in the draft legislation with regard to changes in competency of public authorities. The draft law indicated a clear shift of competency for finding a repository from the Federal Office for Radiation Protection to a federal agency yet to be set up. Prof. Dr. Christoph Moench outlined the deficiencies of the draft legislation in matters of refinancing and the polluter-pays principle. Among the tentative solutions discussed it was above all the Swedish model which was acclaimed most widely. (orig.)

  3. Superfund Record of Decision (EPA region 2): Glen Ridge Radium site, Essex County, NJ. (Second remedial action), June 1990. Final report

    International Nuclear Information System (INIS)

    1990-01-01

    The 90-acre Glen Ridge Radium site is a residential community in the Borough of Glen Ridge, Essex County, New Jersey. The site is adjacent to another Superfund site, the Montclair/West Orange site. The Glen Ridge site includes a community of 274 properties serviced by surface reservoirs in northern New Jersey. In the early 1900s, a radium processing or utilization facility was located in the vicinity of the site. EPA investigations in 1981 and 1983 confirmed the presence of gamma radiation contamination in the Glen Ridge area and in several adjacent houses. The ROD complements the previous 1989 ROD for this site and provides a final remedy. The primary contaminant of concern affecting the soil is radium 226

  4. Limited mobility of dioxins near San Jacinto super fund site (waste pit) in the Houston Ship Channel, Texas due to strong sediment sorption.

    Science.gov (United States)

    Louchouarn, Patrick; Seward, Shaya M; Cornelissen, Gerard; Arp, Hans Peter H; Yeager, Kevin M; Brinkmeyer, Robin; Santschi, Peter H

    2018-02-20

    Sediments from a waste pit in Houston Ship Channel (HSC) were characterized using a number of molecular markers of natural organic matter fractions (e.g., pyrogenic carbon residues, PAHs, lignins), in addition to dioxins, in order to test the hypothesis that the dispersal and mobility of dioxins from the waste pit in the San Jacinto River is minimal. Station SG-6, sampled at the site of the submerged waste pit, had the highest dioxin/furan concentrations reported for the Houston Ship Channel/Galveston Bay (HSC/GB) system (10,000-46,000 pg/g), which translated into some of the highest reported World Health Organization Toxic Equivalents (TEQs: 2000-11,000 pg/g) in HSC sediments. Using a multi-tracer approach, this study confirmed our hypothesis that sludges from chlorinated pulps are a very likely source of dioxins/furans to this pit. However, this material also contained large quantities of additional hydrophobic organic contaminants (PAHs) and pyrogenic markers (soot-BC, levoglucosan), pointing to the co-occurrence of petroleum hydrocarbons and combustion byproducts. Comparison of dioxin/furan signatures in the waste pit with those from sediments of the HSC and a control site suggests that the remobilization of contaminated particles did not occur beyond the close vicinity of the pit itself. The dioxins/furans in sediments outside the waste pit within the HSC are rather from other diffuse inputs, entering the sedimentary environment through the air and water, and which are comprised of a mixture of industrial and municipal sources. Fingerprinting of waste pit dioxins indicates that their composition is typical of pulp and paper sources. Measured pore water concentrations were 1 order of magnitude lower than estimated values, calculated from a multiphase sorption model, indicating low mobility of dioxins within the waste pit. This is likely accomplished by co-occurring and strong sorbing pyrogenic and petrogenic residues in the waste pit, which tend to keep

  5. ERG [Engineering Review Group] and GRG [Geologic Review Group] review of the horizontal versus vertical modes of waste emplacement at the Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    Chytrowski, B.R.

    1988-01-01

    The Engineering Review Group (ERG) and Geologic Review Group (GRG) were established by the Office of Nuclear Waste Isolation (ONWI) to help evaluate specific issues in the US Department of Energy's nuclear waste repository program. The December 1985 meeting and the February 1986 meeting dealt with the evaluation of the Fluor Technology, Inc., architect-engineer recommendation of the horizontal mode of waste package emplacement for the Site Characterization Plan Conceptual Design Report (SCP-CDR). The ONWI recommendation regarding horizontal and vertical modes of waste package emplacement and associated studies was reviewed. This report documents the ERG and GRG's comments and recommendations on this subject and ONWI responses to the specific points raised by these groups. The ERG and GRG joint review groups concurred with ONWI recommendations that additional studies are required in order to reach a decision on the method of emplacement to be used. In the opinion of these groups, both methods can be implemented; however, should the decision be reached today the vertical mode would be preferred

  6. Redd Site Selection and Spawning Habitat Use by Fall Chinook Salmon, Hanford Reach, Columbia River : Final Report 1995 - 1998.

    Energy Technology Data Exchange (ETDEWEB)

    Geist, David R.

    1999-05-01

    year to year. The tendency to spawn in clusters suggests fall chinook salmon's use of spawning habitat is highly selective. Hydraulic characteristics of the redd clusters were significantly different than the habitat surrounding them. Velocity and lateral slope of the river bottom were the most important habitat variables in predicting redd site selection. While these variables explained a large proportion of the variance in redd site selection (86 to 96%), some unmeasured factors still accounted for a small percentage of actual spawning site selection. Chapter three describes the results from an investigation into the hyporheic characteristics of the two spawning areas studied in chapter two. This investigation showed that the magnitude and chemical characteristics of hyporheic discharge were different between and within two spawning areas. Apparently, fall chinook salmon used chemical and physical cues from the discharge to locate spawning areas. Finally, chapter four describes a unique method that was developed to install piezometers into the cobble bed of the Columbia River.

  7. Construction and operation of a tritium extraction facility at the Savannah River Site. Final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    DOE proposes to construct and operate a Tritium Extraction Facility (TEF) at H Area on the Savannah River Site (SRS) to provide the capability to extract tritium from commercial light water reactor (CLWR) targets and from targets of similar design. The proposed action is also DOE's preferred alternative. An action alternative is to construct and operate TEF at the Allied General Nuclear Services facility, which is adjacent to the eastern side of the SRS. Under the no-action alternative DOE could incorporate tritium extraction capabilities in the accelerator for production of tritium. This EIS is linked to the Final Programmatic Environmental Impact Statement for Tritium Supply and Recycling, from which DOE determined that it would produce tritium either in an accelerator or in a commercial light water reactor. The purpose of the proposed action and alternatives evaluated in this EIS is to provide tritium extraction capability to support either tritium production technology. The EIS assesses the environmental impacts from the proposed action and the alternatives, including the no action alternative

  8. Radioactive waste isolation in salt: peer review of the Office of Nuclear Waste Isolation's reports on preferred repository sites within the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    Fenster, D.; Edgar, D.; Gonzales, S.; Domenico, P.; Harrison, W.; Engelder, T.; Tisue, M.

    1984-04-01

    Documents are being submitted to the Salt Repository Project Office (SRPO) of the US Department of Energy (DOE) by Battelle Memorial Institute's Office of Nuclear Waste Isolation (ONWI) to satisfy milestones of the Salt Repository Project of the Civilian Radioactive Waste Management Program. Some of these documents are being reviewed by multidisciplinary groups of peers to ensure DOE of their adequacy and credibility. Adequacy of documents refers to their ability to meet the standards of the US Nuclear Regulatory Commission, as enunciated in 10 CFR 60, and the requirements of the National Environmental Policy Act and the Nuclear Waste Policy Act of 1982. Credibility of documents refers to the validity of the assumptions, methods, and conclusions, as well as to the completeness of coverage. This report summarizes Argonne's review of ONWI's two-volume draft report entitled Identification of Preferred Sites within the Palo Duro Basin: Vol. 1 - Palo Duro Location A, and Vol. 2 - Palo Duro Location B, dated January 1984. Argonne was requested by DOE to review these documents on January 17 and 24, 1984 (see App. A). The review procedure involved obtaining written comments on the reports from three members of Argonne's core peer review staff and three extramural experts in related research areas. The peer review panel met at Argonne on February 6, 1984, and reviewer comments were integrated into this report by the review session chairman, with the assistance of Argonne's core peer review staff. All of the peer review panelists concurred in the way in which their comments were represented in this report (see App. B). A letter report and a draft of this report were sent to SRPO on February 10, 1984, and April 17, 1984, respectively. 5 references

  9. Search for a final repository site. How is the status of the preparation of final radioactive waste disposal in Germany?; Endlagersuche. Wie steht es um die Vorbereitung der Entsorgung radioaktiver Abfaelle in Deutschland?

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Monika C.M. (ed.) [Evangelische Akademie Loccum, Rehburg-Loccum (Germany). Arbeitsbereich Naturwissenschaften, Oekologie und Umweltpolitik

    2017-07-01

    During the workshop on the status of the preparation of final radioactive waste disposal in Germany the following issues were discussed: socio-economic challenges two years after the final report of the commission for final disposal of radioactive wastes; the question of public participation - the difficult search for a repository site, experiences and intents of public participation during the work of the commission, interim storage of hear generating radioactive wastes, extended interim-storage, long-term interim storage facilities - opinion of the concerned public, how to establish a controlling and correcting surveillance of the process?.

  10. Transforming Developmental Education in Texas

    Science.gov (United States)

    Journal of Developmental Education, 2014

    2014-01-01

    In recent years, with support from the Texas Legislature, the Texas Higher Education Coordinating Board has funded various developmental education initiatives, including research and evaluation efforts, to help Texas public institutions of higher education provide more effective programs and services to underprepared students. Based on evaluation…

  11. Forests of east Texas, 2016

    Science.gov (United States)

    Kerry Dooley

    2018-01-01

    This resource update provides an overview of forest resources in east Texas based on an inventory conducted by the U.S. Forest Service, Forest Inventory and Analysis (FIA) program at the Southern Research Station (SRS) in cooperation with Texas A&M Forest Service. The 254 counties of Texas are consolidated into seven FIA survey units—Southeast (unit 1),...

  12. Development of a method for the comparison of final repository sites in different host rock formations; Weiterentwicklung einer Methode zum Vergleich von Endlagerstandorten in unterschiedlichen Wirtsgesteinsformationen

    Energy Technology Data Exchange (ETDEWEB)

    Fischer-Appelt, Klaus; Frieling, Gerd; Kock, Ingo; and others

    2017-10-15

    The report on the development of a method for the comparison of final repository sites in different host rock formations covers the following issues: influence of the requirement of retrievability on the methodology, study on the possible extension of the methodology for repository sites with crystalline host rocks: boundary conditions in Germany, final disposal concept for crystalline host rocks, generic extension of the VerSi method, identification, classification and relevance weighting of safety functions, relevance of the safety functions for the crystalline host rock formation, review of the methodological need for changes for crystalline rock sites under low-permeability covering; study on the applicability of the methodology for the determination of site regions for surface exploitation (phase 1).

  13. Final Confirmation Sampling and Analysis Report for the POL Yard, Sites SS-06 and ST-40, Wurtsmith AFB, Michigan

    National Research Council Canada - National Science Library

    1999-01-01

    .... Wurtsmith AFBCA and AFCEE/ERT had no comments on the draft final report. This report represents the final contract deliverable for the AFCEE Extended Bioventing Project at the Wurtsmith AFB POL Yard...

  14. Final Report for Project ''Role of Metal Bioavailability in In Situ Bioremediation of Metal and Organic Co-Contaminated Sites''; FINAL

    International Nuclear Information System (INIS)

    Raina M. Maier

    2002-01-01

    A large proportion of hazardous waste sites are co-contaminated with organics and various metals. Such co-contaminated sites are difficult to bioremediate due to the nature of the mixed contaminants. Specifically, the presence of a co-contaminating metal imposes increased stress on indigenous populations already impacted by organic contaminant stress. The overall objective of this research is to investigate the effect of varying metal bioavailability on microbial populations and biodegradation of organics to allow a better understanding of how optimize remediation of co-contaminated sites. The hypothesis for this project is that metal bioavailability is not directly correlated with metal stress imposed on microbial populations that are degrading organics in soil and that further understanding of the relationship between metal bioavailability and metal stress is required for successful treatment of sites contaminated with mixtures of organics and metals. The specific objectives to be addressed to accomplish this goal are: (1) To determine the influence of metal bioavailability in soil microcosms co-contaminated with organics and metals on degradation of the organic contaminants and on mechanisms of metal resistance and (2) To determine the efficacy of different bioremediation strategies for co-contaminated soils based on metal bioavailability

  15. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Attachment 3, Ground water hydrology report: Preliminary final

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-04

    The US Environmental Protection Agency (EPA) has established health and environmental protection regulations to correct and prevent ground water contamination resulting from processing activities at inactive uranium milling sites (52 FR 36000 (1987)). According to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, 42 USC {section}7901 et seq., the US Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has determined that for Slick Rock, this assessment shall include hydrogeologic site characterization for two separate uranium processing sites, the Union Carbide (UC) site and the North Continent (NC) site, and for the proposed Burro Canyon disposal site. The water resources protection strategy that describes how the proposed action will comply with the EPA ground water protection standards is presented in Attachment 4. The following site characterization activities are discussed in this attachment: Characterization of the hydrogeologic environment, including hydrostratigraphy, ground water occurrence, aquifer parameters, and areas of recharge and discharge. Characterization of existing ground water quality by comparison with background water quality and the maximum concentration limits (MCL) of the proposed EPA ground water protection standards. Definition of physical and chemical characteristics of the potential contaminant source, including concentration and leachability of the source in relation to migration in ground water and hydraulically connected surface water. Description of local water resources, including current and future use, availability, and alternative supplies.

  16. Meteorological tower data for the Yucca Alluvial (YA) site and Yucca Ridge (YR) site: Final data report, July 1983-October 1984

    International Nuclear Information System (INIS)

    Church, H.W.; Freeman, D.L.; Boro, K.; Egami, R.T.

    1987-11-01

    The purpose of the NNWSI meteorological data collection program was to support environmental evaluations of site suitability for a nuclear waste repository. This is the last of a series of data summaries for the NNWSI Alluvial and Ridge Sites in southern Nevada. 3 refs., 3 figs., 6 tabs

  17. The satellite symposium of the 2nd COE-INES international symposium, INES-2 on 'final disposal sites: How were they determined?'

    International Nuclear Information System (INIS)

    2007-03-01

    The symposium was organized on December 1, 2006, by Tokyo Institute of Technology in charge of the 21st century COE program to establish innovative nuclear energy systems for sustainable development of the world. It was aimed at finding the process of determining the final radioactive waste disposal sites of Japan through a comprehensive and interdisciplinary approach. Four guests, 2 from Finland and 2 from Korea each one from the promoting side and the other from the local governmental side, were invited from the two countries that have already determined the sites through the necessary processes to find the consensus. Participants were 103 including 7 from abroad. The symposium consisted of plenary lectures: Regulators' Role in Development of Finnish Nuclear Waste Disposal Program, and A Successful Case Site Selection for Low- and Intermediate-Level Radioactive Waste Disposal Facility, Site Selection for LILW Disposal Facility in Korea, Public Participations in the Selection and Acceptance of Olkiluoto Site for the Final Disposal of Spent Nuclear Fuel in Finland and, continuously, a panel discussion to find what are the key problems in solving the final disposal site selection in Japan and what will play a major role towards the solution of this important issues. The report includes all the lectures with diagrams and the records of questions and answers. (S. Ohno)

  18. Iguana bites reported to Texas poison centers.

    Science.gov (United States)

    Forrester, Mathias B

    2010-09-01

    Although thousands of iguanas are kept as pets in the United States, information on their bites is limited. The intent of this investigation was to describe the pattern of iguana bites reported to Texas poison centers. Iguana bites reported during 1998-2008 were identified. The distribution of cases by various factors was determined. Of 59 total bites, 71% were managed on-site, 17% of the patients were at or en route to a health care facility when the poison center was contacted, and 10% were referred to a health care facility. The medical outcome was no effect in 9% of the cases, minor effect in 24%, moderate effect in 2%, not followed but minimal effects possible in 64%, and unable to follow but potentially toxic in 2%. Most iguana bites reported to Texas poison centers did not result in serious effects and were managed on-site. Copyright © 2010 Elsevier Inc. All rights reserved.

  19. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 2, Geology report. Revised final report

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-01

    Detailed investigations of geologic, geomorphic, and seismic conditions at the Bodo Canyon disposal site were conducted. The purpose of these investigations was basic site characterization and identification of potential geologic hazards that could affect long-term site stability. Subsequent engineering studies, such as analyses of hydrologic and liquefaction hazards, used the data developed in these studies. The geomorphic analysis was employed in the design of effective erosion protection. Studies of the regional and local seismotectonic setting, which included a detailed search for possible capable faults within a 65 kilometer radius of the site, provided the basis for seismic design parameters. The scope of work performed included the following: Compilation and analysis of previous published and unpublished geologic literature and maps; Review of historical and instrumental earthquake data; Review of site-specific subsurface geologic data, including lithologic and geophysical logs of exploratory boreholes advanced in the site area; Photogeologic interpretations of existing conventional aerial photographs; and, Ground reconnaissance and mapping of the site region.

  20. Tornado from Texas.

    Science.gov (United States)

    Vail, Kathleen

    1996-01-01

    Santa Fe School Superintendent Yvonne Gonzales, the "Texas Tornado," was hired to fix a 40% student-dropout rate and a white/Hispanic gap in achievement test scores. Gonzales is an avid integrationist; relies on humor, appeasement, and persuasion tactics; and has alienated some school employees by increasing central office…

  1. Lake Aquilla - Habitat Survey Hill County, Texas

    Science.gov (United States)

    2017-08-01

    forb dominated areas with scattered clumps of trees and shrubs , Lake Aquilla, Texas. ............................... 17 Figure 12. Site photo from...demonstrating low cover by undesirable trees and shrubs within the prairie remnant, but with high densities of woody vegetation encroaching the...multiple strata of sub-canopy trees, shrubs , and vines. Although these types of stands are accounted for in some historical records, the mosaics of oak

  2. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 3, Groundwater hydrology report. Revised final report

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-01

    The US Environmental Protection Agency (EPA) has established health and environmental protection regulations to correct and prevent groundwater contamination resulting from processing activities at inactive uranium milling sites. According to the Uranium Mill Tailings Radiation Control Act of 1978, (UMTRCA) the US Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has determined this assessment shall include information on hydrogeologic site characterization. The water resources protection strategy that describes how the proposed action will comply with the EPA groundwater protection standards is presented in Attachment 4. Site characterization activities discussed in this section include: Characterization of the hydrogeologic environment; characterization of existing groundwater quality; definition of physical and chemical characteristics of the potential contaminant source; and description of local water resources.

  3. Monitoring Soil Erosion of a Burn Site in the Central Basin and Range Ecoregion: Final Report on Measurements at the Gleason Fire Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Julianne [DRI; Etyemezian, Vicken [DRI; Shillito, Rose [DRI; Cablk, Mary [DRI; Fenstermaker, Lynn [DRI; Shafer, David [DOE Legacy Management

    2013-10-01

    The increase in wildfires in arid and semi-arid parts of Nevada and elsewhere in the southwestern United States has implications for post-closure management and long-term stewardship for Soil Corrective Action Units (CAUs) on the Nevada National Security Site (NNSS) for which the Nevada Field Office of the United States Department of Energy, National Nuclear Security Administration has responsibility. For many CAUs and Corrective Action Sites, where closure-in-place alternatives are now being implemented or considered, there is a chance that these sites could burn over at some time while they still pose a risk to the environment or human health, given the long half lives of some of the radionuclide contaminants. This study was initiated to examine the effects and duration of wildfire on wind and water erodibility on sites analogous to those that exist on the NNSS. The data analyzed herein were gathered at the prescribed Gleason Fire site near Ely, Nevada, a site comparable to the northern portion of the NNSS. Quantification of wind erosion was conducted with a Portable In-Situ Wind ERosion Lab (PI-SWERL) on unburned soils, and on interspace and plant understory soils within the burned area. The PI-SWERL was used to estimate emissions of suspendible particles (particulate matter with aerodynamic diameters less than or equal to 10 micrometers) at different wind speeds. Filter samples, collected from the exhaust of the PI-SWERL during measurements, were analyzed for chemical composition. Based on nearly three years of data, the Gleason Fire site does not appear to have returned to pre burn wind erosion levels. Chemical composition data of suspendible particles are variable and show a trend toward pre-burn levels, but provide little insight into how the composition has been changing over time since the fire. Soil, runoff, and sediment data were collected from the Gleason Fire site to monitor the water erosion potential over the nearly three-year period. Soil

  4. Development of methods and criteria for a standardized evaluation of contaminated sites and abandoned waste disposal sites particularly concerning their ground water contamination potential. Pt. 1. Final Report

    International Nuclear Information System (INIS)

    Kerndorff, H.; Schleyer, R.; Arneth, J.D.; Struppe, T.; Milde, G.

    1994-01-01

    Contaminated sites should be evaluated to such an extend, that nearly all risks for man and environment can be safely estimated. An assessment for such sites is presented which combines a substance-specific and a site-specific evaluation. It is a standardized path-specific concept in which - as an example - the contamination path ''waste - groundwater - drinking-water'' is investigated and evaluated in detail. Path-specific main contaminants are established on a statistic basis and ranked according to normalized evaluation numbers of 1-100. Their toxicity potential is calculated for which a particular and standardized method was developed. Main contaminants having a high toxicity potential are called priority contaminants. For the most important exposure/usage on this contamination path, the drinking-water catchment, hygienic and toxicologic based standards are presented. Together with site-specific conditions and the also path-specific and normalized transfer/persistency potential of the priority contaminants it is possible to come to a site- and usage/exposure-specific evaluation of individual sites. (orig.) [de

  5. Superfund Record of Decision (EPA Region 2): Ramapo Landfill Site, Rockland County, NY. (First remedial action), March 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 60-acre former landfill site is located on a 96-acre tract in the Town of Ramapo, Rockland County, New York, about 35 miles northwest of New York City. Utility corridors lie on three sides of the site, including high-voltage power transmission lines. The site is currently being used as a compaction and transfer facility by the Town of Ramapo. Trash and debris are weighed at a weigh station/guardhouse, compacted at a baler facility in the northeastern corner of the site, and transferred to the Al Turi Landfill in Goshen, New York. The ROD represents the entire remedial action for the site by controlling source of contamination and the generation of leachate, and treatment of contaminated ground water. The primary contaminants of concern affecting soil, ground water, and surface water are VOCs, including benzene; other organics; and metals, including arsenic, chromium, and lead. The selected remedial action for the site is included

  6. Monitoring Soil Erosion on a Burned Site in the Mojave-Great Basin Transition Zone: Final Report for the Jacob Fire Site

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Julianne [DRI; Etyemezian, Vic [DRI; Cablk, Mary E. [DRI; Shillito, Rose [DRI; Shafer, David [DOE Grand Junction, Colorado

    2013-06-01

    A historic return interval of 100 years for large fires in the U.S. southwestern deserts is being replaced by one where fires may reoccur as frequently as every 20 to 30 years. The shortened return interval, which translates to an increase in fires, has implications for management of Soil Corrective Action Units (CAUs) and Corrective Action Sites (CASs) for which the Department of Energy, National Nuclear Security Administration Nevada Field Office has responsibility. A series of studies was initiated at uncontaminated analog sites to better understand the possible impacts of erosion and transport by wind and water should contaminated soil sites burn. The first of these studies was undertaken at the Jacob Fire site approximately 12 kilometers (7.5 miles) north of Hiko, Nevada. A lightning-caused fire burned approximately 200 hectares during August 6-8, 2008. The site is representative of a transition between Mojave and Great Basin desert ecoregions on the Nevada National Security Site (NNSS), where the largest number of Soil CAUs/CASs are located. The area that burned at the Jacob Fire site was primarily a Coleogyne ramosissima (blackbrush) and Ephedra nevadensis (Mormon tea) community, also an abundant shrub assemblage in the similar transition zone on the NNSS. This report summarizes three years of measurements after the fire. Seven measurement campaigns at the Jacob Fire site were completed. Measurements were made on burned ridge (upland) and drainage sites, and on burned and unburned sites beneath and between vegetation. A Portable In-Situ Wind Erosion Lab (PI-SWERL) was used to estimate emissions of suspended particles at different wind speeds. Context for these measurements was provided through a meteorological tower that was installed at the Jacob Fire site to obtain local, relevant environmental parameters. Filter samples, collected from the exhaust of the PI-SWERL during measurements, were analyzed for chemical composition. Runoff and water erosion were

  7. Final environmental impact statement for the Nevada Test Site and off-site locations in the State of Nevada. Volume 1, Appendices A-F

    International Nuclear Information System (INIS)

    1996-08-01

    This sitewide EIS evaluates the potential environmental impacts of four possible land-use alternatives being considered for the Nevada Test Site (NTS), the Tonopah Test Range, and the formerly operated DOE sites in the state of Nevada: the Project Shoal Area, the Central Nevada Test Area, and portions of the Nellis Air Force Range Complex. Three additional sites in Nevada-Eldorado Valley, Dry Lake Valley, and Coyote Spring Valley-are evaluated for collocation of solar energy production facilities. The four alternatives include Continue Current Operations (No Action, continue to operate at the level maintained for the past 3 to 5 years); Discontinue Operations 1 (discontinue operations and interagency programs); Expanded Use (increased use of NTS and its resources to support defense and nondefense programs); and Alternate Use of Withdrawn Lands (discontinue all defense-related activities at NTS; continue waste management operations in support of NTS environmental restoration efforts; expand nondefense research). Environmental impacts were assessed for each alternative by analyzing, to the extent possible, the discrete and cumulative environmental impacts associated with Defense Waste Management, Environmental Restoration, Nondefense Research and Development, and Work for Others Programs. A framework for a Resource Management Plan is included as Volume 2 of this EIS and represents the development of an ecosystem based planning process closely integrated with the National Environmental Policy Act process. This EIS, among other things, analyzed the impacts of transportation of low level waste, and site characterization activities related to the Yucca Mountain Project but did not analyze the suitability of the site as a repository. This EIS does not analyze the suitability of the Yucca Mountain site as a repository as this is an action beyond the scope of the EIS. Volume 3 of this EIS contains the public comments and the responses to the comments

  8. Final environmental impact statement for the Nevada Test Site and off-site locations in the State of Nevada. Volume 1, Chapters 1-9

    International Nuclear Information System (INIS)

    1996-08-01

    This sitewide EIS evaluates the potential environmental impacts of four possible land-use alternatives being considered for the Nevada Test Site (NTS), the Tonopah Test Range, and the formerly operated DOE sites in the state of Nevada: the Project Shoal Area, the Central Nevada Test Area, and portions of the Nellis Air Force Range Complex. Three additional sites in Nevada-Eldorado Valley, Dry Lake Valley, and Coyote Spring Valley-are evaluated for collocation of solar energy production facilities. The four alternatives include Continue Current Operations (No Action, continue to operate at the level maintained for the past 3 to 5 years); Discontinue Operations 1 (discontinue operations and interagency programs); Expanded Use (increased use of NTS and its resources to support defense and nondefense programs); and Alternate Use of Withdrawn Lands (discontinue all defense-related activities at NTS; continue waste management operations in support of NTS environmental restoration efforts; expand nondefense research). Environmental impacts were assessed for each alternative by analyzing, to the extent possible, the discrete and cumulative environmental impacts associated with Defense Waste Management, Environmental Restoration, Nondefense Research and Development, and Work for Others Programs. A framework for a Resource Management Plan is included as Volume 2 of this EIS and represents the development of an ecosystem based planning process closely integrated with the National Environmental Policy Act process. This EIS, among other things, analyzed the impacts of transportation of low level waste, and site characterization activities related to the Yucca Mountain Project but did not analyze the suitability of the site as a repository. This EIS does not analyze the suitability of the Yucca Mountain site as a repository as this is an action beyond the scope of the EIS. Volume 3 of this EIS contains the public comments and the responses to the comments

  9. Remedial actions at the former Vitro Rare Metals plant site, Canonsburg, Washington County, Pennsylvania. Final Environmental Impact Statement. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    1983-07-01

    The environmental impacts associated with remedial actions in connection with residual radioactive materials remaining at the inactive uranium processing site located in Canonsburg, Washington County, Pennsylvania are evaluated. The Canonsburg site is an 18.5-acre property that was formerly owned by the Vitro Rare Metals Company. The expanded Canonsburg site would be 30-acre property that would include the Canonsburg site (the former Vitro Rare Metals plant), seven adjacent private houses, and the former Georges Pottery property. During the period 1942 through 1957 the Vitro Manufacturing Company and its successor, the Vitro Corporation of America, processed onsite residues and ores, and government-owned ores, concentrates, and scraps to extract uranium and other rare metals. The Canonsburg site is now the Canon Industrial Park. In addition to storing the residual radioactive materials of this process at the Canonsburg site, about 12,000 tons of radioactively contaminated materials were transferred to a railroad landfill in Burrell Township, Indiana County, Pennsylvania. This Canonsburg FEIS evaluates five alternatives for removing the potential public health hazard associated with the radioactively contaminated materials. In addition to no action, these alternatives involve various combinations of stabilization of the radioactively contaminated materials in place or decontamination of the Canonsburg and Burrell sites by removing the radioactively contaminated materials to another location. In addition to the two sites mentioned, a third site located in Hanover Township, Washington County, Pennsylvania has been considered as a disposal site to which the radioactively contaminated materials presently located at either of the other two sites might be moved.

  10. Remedial actions at the former Vitro Rare Metals plant site, Canonsburg, Washington County, Pennsylvania. Final Environmental Impact Statement. Volume I

    International Nuclear Information System (INIS)

    1983-07-01

    The environmental impacts associated with remedial actions in connection with residual radioactive materials remaining at the inactive uranium processing site located in Canonsburg, Washington County, Pennsylvania are evaluated. The Canonsburg site is an 18.5-acre property that was formerly owned by the Vitro Rare Metals Company. The expanded Canonsburg site would be 30-acre property that would include the Canonsburg site (the former Vitro Rare Metals plant), seven adjacent private houses, and the former Georges Pottery property. During the period 1942 through 1957 the Vitro Manufacturing Company and its successor, the Vitro Corporation of America, processed onsite residues and ores, and government-owned ores, concentrates, and scraps to extract uranium and other rare metals. The Canonsburg site is now the Canon Industrial Park. In addition to storing the residual radioactive materials of this process at the Canonsburg site, about 12,000 tons of radioactively contaminated materials were transferred to a railroad landfill in Burrell Township, Indiana County, Pennsylvania. This Canonsburg FEIS evaluates five alternatives for removing the potential public health hazard associated with the radioactively contaminated materials. In addition to no action, these alternatives involve various combinations of stabilization of the radioactively contaminated materials in place or decontamination of the Canonsburg and Burrell sites by removing the radioactively contaminated materials to another location. In addition to the two sites mentioned, a third site located in Hanover Township, Washington County, Pennsylvania has been considered as a disposal site to which the radioactively contaminated materials presently located at either of the other two sites might be moved

  11. Proposed ground water protection strategy for the Uranium Mill Tailings Site at Green River, Utah. Final report

    International Nuclear Information System (INIS)

    1994-11-01

    This document presents the US DOE water resources protection strategy for the Green River, Utah mill tailings disposal site. The modifications in the original plan are based on new information, including ground water quality data collected after remedial action was completed, and on a revised assessment of disposal cell design features, surface conditions, and site hydrogeology. All aspects are discussed in this report

  12. Losses of off-site power at U.S. nuclear power plants -- through 1995. Final report

    International Nuclear Information System (INIS)

    Wyckoff, H.

    1996-04-01

    This report provides a database and summary analysis of losses of off-site power at US nuclear generating units. It includes the 16 years 1980 through 1995. This is the twelfth update of this database and analysis. During 1994 there were no losses of all off-site power and in 1995 only two short losses. Both the short term and long term US loss of all off-site power experience is extremely favorable. The frequency of losing all off-site power is an important input to many nuclear plant safety assessments. The industry's loss of all off-site power experience that is set forth in this report can provide perspective to plant specific probabilistic safety assessments

  13. Commercial Space Port Planning in Texas

    Science.gov (United States)

    Bell, L.; Looke, B.

    2002-01-01

    The Texas Legislature is providing funding to support research and planning activities aimed at creating a commercial spaceport in the state. These monies have been allocated to regional Spaceport Development Corporations that have been established in three countries containing candidate site locations: Willacy County (in South Texas); Brazoria County (East Texas); and Pecos County (West Texas). This program is being sponsored and coordinated by the Texas Aerospace Commission (TAC). The Sasakawa International Center for Space Architecture (SICSA) at the University of Houston is providing research, planning and design support to TAC and is a member of each of the three regional development teams. Planning must carefully consider special support requirements and operational characteristics of all prospective launch systems along with geographic, infrastructure and environmental factors at each site. Two of the candidate sites are in coastal areas; a priority for certain launch service providers; whereas the third inland site is more attractive to others. Candidate launch systems include winged horizontal takeoff air-launch vehicles, vertical multi-stage reusable launch vehicles, and expendable sub-orbital surrounding rockets. Important research and planning activities include environmental impact assessments, analyses of overflight hazards, investigations of economic impacts and business plan development. The results of these activities will guide master plan development for each site, including: a physical plan (site layout, infrastructure improvements and facility construction); and a strategic plan (user agreements, licenses, finance sources and participants). Commercial spaceport development demands compliance with stringent FAA regulations established by the Office of Commercial Space Transportation (OCST) which exceed minimum standards allowed for U.S. Government spaceport facilities. Key among these requirements are 15,000 ft. radius on-site clear zones

  14. SUPERFUND TREATABILITY CLEARINGHOUSE: FINAL REPORT DEMONSTRATION TEST ON-SITE PCB DESTRUCTION, SHIRCO INFRARED PORTABLE UNIT AT FLORIDA STEEL INDIANTOWN MILL SITE, INDIANTOWN, FLORIDA.

    Science.gov (United States)

    This document reports on the results of a Florida Steel Corporation study to develop and evaluate cleanup alternatives for onsite treatment of PCB contaminated soils. The results of this study aided in the selection of an approach to remediate the site. Demonstration tes...

  15. Texas turns on lignite

    International Nuclear Information System (INIS)

    Faulkner, T.

    1992-01-01

    The paper describes the author's involvement with the Texas Mining and Reclamation Association (TMRA) and some of its activities. The mission of TMRA is to solidify the needs and opinions of the various mining sectors into one voice which can be heard on the vital matters of balance between mineral production, environmental protection, economic strength and public welfare. To make this voice effective, TMRA will present the mining industry - and its value to the Texas economy and lifestyle - to the public, educators and students, regulatory officials, legislators and to the media to enhance their understanding. TMRA will promote the active participation of its members in association affairs and strive for integrity, clarity and vision throughout all its operations and activities

  16. Project ANSICHT. Final repository concept and backfilling and sealing concept for the final repository site model SUeD; Projekt ANSICHT. Endlagerkonzept sowie Verfuell- und Verschlusskonzept fuer das Endlagerstandortmodell SUeD. Technischer Bericht

    Energy Technology Data Exchange (ETDEWEB)

    Jobmann, Michael; Lommerzheim, Andree

    2015-08-03

    In the frame of ANSICHT the methodology for the demonstration of safe enclosure for high-level heat generating radioactive wastes is described. The report is based on the safety requirements for final repository concepts and shows a first backfilling and sealing concept that was developed for the final repository site model SUeD. The final repository model SUeD is based on a horizontal line storage concept, the Gorleben (VSG) and ERATO container concept and the mine layout were adopted and adapted to the given conditions. The backfill and sealing concept includes migration barriers, line closures and shaft closures in the frame of a redundant and diverse enclosure system. For all technical and geotechnical barrier components the long-term functional requirements were defined. The backfilling concept of underground cavities considers the variety of possible cavities in the line and infrastructure areas.

  17. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Remedial Action Selection Report. Preliminary final

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This proposed remedial action plan incorporates the results of detailed investigation of geologic, geomorphic, and seismic conditions at the proposed disposal site. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/waterborne materials to a permanent repository at the proposed Burro Canyon disposal cell. The proposed disposal site will be geomorphically stable. Seismic design parameters were developed for the geotechnical analyses of the proposed cell. Cell stability was analyzed to ensure long-term performance of the disposal cell in meeting design standards, including slope stability, settlement, and liquefaction potential. The proposed cell cover and erosion protection features were also analyzed and designed to protect the RRM (residual radioactive materials) against surface water and wind erosion. The location of the proposed cell precludes the need for permanent drainage or interceptor ditches. Rock to be used on the cell top-, side-, and toeslopes was sized to withstand probable maximum precipitation events.

  18. Final environmental impact statement for the Nevada Test Site and off-site locations in the State of Nevada. Transportation study, Volume 1, Appendix I

    International Nuclear Information System (INIS)

    1996-08-01

    This report has been prepared to address local transportation issues concerning current and potential operations at the Nevada Test Site (NTS), to document the results of the NTS transportation risk analysis, and to provide information and supporting documentation for the Environmental Impact Statement (EIS) for the NTS and Off-Site Locations in the State of Nevada. Four alternatives are evaluated in the NTS EIS: Alternative 1, Continue Current Operations, (No Action); Alternative 2, Discontinue Operations; Alternative 3, Expanded Use; and Alternative 4, Alternate Use of Withdrawn Lands. The transportation risk analysis estimated the health risk from highway transportation of DOE-generated low-level waste, mixed waste, and defense-related nuclear materials for each of the four alternatives

  19. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Final report

    International Nuclear Information System (INIS)

    1996-08-01

    This document contains the page changes for Attachment 3, Ground Water Hydrology Report dated August, 1996 for the Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings at Slick Rock, Colorado. This portion of Attachment 3 contains the Table of Contents pages i and ii, and pages numbered 3-3 through 3-56 of the Ground Water Hydrology Report. Also included are the cover sheets for Appendix A, B, and C to Attachment 3

  20. Final environmental impact statement for the Nevada Test Site and off-site locations in the State of Nevada. American Indian Assessments. Volume 1, Appendix G

    International Nuclear Information System (INIS)

    1996-08-01

    The Native American Resource Document is a summary of opinions expressed by the Consolidated Group of Tribes and Organizations (CGTO) regarding the Environmental Impact Statement for the Nevada Test Site and Other Off-Site Locations within the State of Nevada (NTS EIS). The document contains (a) general concerns regarding long-term impacts of the U.S. Department of Energy's (DOE) operations on the NTS and (b) a synopsis of specific comments made by the American Indian Writers Subgroup (AIWS) for various chapters of the NTS EIS. The Native American Resource Document was produced in response to consultation required for the NTS EIS, in accordance with DOE Order 1230.2, American Indian Tribal Government Policy. The consultation focused specifically on four alternative management decisions concerning the future mission of the NTS and related off-site locations in Nevada. However, the present CGTO's response to this consultation is not limited to EIS alternatives, but also integrates relevant recommendations made by Indian people for previous DOE projects in which American Indians participated

  1. Remedial actions at the former Union Carbide Corporation uranium mill sites, Rifle, Garfield County, Colorado: Final environmental impact statement

    International Nuclear Information System (INIS)

    1990-03-01

    This appendix provides the information needed to understand the conceptual designs for the remedial action alternatives addressed in this environmental impact statement (EIS). It is intended to provide sufficient details for the reader to evaluate the feasibility and assess the impacts of each remedial action alternative. It is not intended to provide the detailed engineering necessary to implement the alternatives. Details of the preferred remedial action will be presented in the remedial action plan (RAP). The remedial action alternatives addressed in this EIS include no action, stabilization at the New Rifle site, disposal at the Estes Gulch site, and disposal at the Lucas Mesa site. All alternatives include interim actions to remediate existing health and safety hazards to the Rifle community that presently exist at the Old and New Rifle processing sites. 21 figs., 18 tabs

  2. The Nature, Origin, and Importance of Carbonate-Bearing Samples at the Final Three Candidate Mars 2020 Landing Sites

    Science.gov (United States)

    Horgan, B.; Anderson, R. B.; Ruff, S. W.

    2018-04-01

    All three candidate Mars 2020 landing sites contain similar regional olivine/carbonate units, and a carbonate unit of possible lacustrine origin is also present at Jezero. Carbonates are critical for Mars Sample Return as records of climate and biosignatures.

  3. Issuance of Final Guidance: Ecological Risk Assessment and Risk Management Principles for Superfund Sites, October 7, 1999

    Science.gov (United States)

    This guidance is intended to help Superfund risk managers make ecological risk management decisions that are based on sound science, consistent across Regions, and present a characterization of site risks that is transparent to the public.

  4. Site characterization techniques used in environmental restoration activities. Final report of a co-ordinated research project 1995-1999

    International Nuclear Information System (INIS)

    2000-05-01

    The objective of this CRP was to promote the exchange of information on the practical experience gained by the Member States in characterization of radioactively contaminated sites. Special emphasis was placed on the development of methods and techniques for the optimization of radiological characterization. In particular, the scope included: definition of a strategy for site characterization; sampling and measurement techniques; data management, including statistical analysis and deterministic radionuclide migration modelling; and post-cleanup radiological surveys and assurance of compliance with release criteria

  5. Site characterization techniques used in environmental restoration activities. Final report of a co-ordinated research project 1995-1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-05-01

    The objective of this CRP was to promote the exchange of information on the practical experience gained by the Member States in characterization of radioactively contaminated sites. Special emphasis was placed on the development of methods and techniques for the optimization of radiological characterization. In particular, the scope included: definition of a strategy for site characterization; sampling and measurement techniques; data management, including statistical analysis and deterministic radionuclide migration modelling; and post-cleanup radiological surveys and assurance of compliance with release criteria.

  6. The search for a final disposal site as field of conflict. A proposition for a profile of a problem-oriented sociological repository research

    International Nuclear Information System (INIS)

    Hocke, P.

    2005-01-01

    The search for a final disposal site for high-level nuclear waste in Germany is to characterize as an enduring and politicised conflict causing a blocked process of decision making. A social science based research on final disposals, reflecting this stalemate situation in Germany, did not take place since the middle of the 1980s. This ITAS paper presents a proposal, how - by the means of social science - the chances and risks for further decision making about nuclear waste could be articulated more precise. (orig.)

  7. Ecological Baseline, Fort Hood, Texas

    Science.gov (United States)

    1980-08-01

    cedar eTm (Uiimus crassifolia), Texas ash (Fraxinus texansis), and Texas persimmon ( Diospyros texana). Conversely, the two predominant tree species...Ilex decidua), Mex- ican buckeye (Ungnadia spjeciosa), and Texas persimmon ( Diospyros texana). Vines included greenbrier (Smilax bona-nox) and white...Hedgehey Cactus (Echinocereus sp.) has been observed on Fort Hood. Due to the brief period of flowering for this genus , the individual species were not

  8. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Webb, Robert C. [Texas A& M University; Kamon, Teruki [Texas A& M University; Toback, David [Texas A& M University; Safonov, Alexei [Texas A& M University; Dutta, Bhaskar [Texas A& M University; Dimitri, Nanopoulos [Texas A& M University; Pope, Christopher [Texas A& M University; White, James [Texas A& M University

    2013-11-18

    Overview The High Energy Physics Group at Texas A&M University is submitting this final report for our grant number DE-FG02-95ER40917. This grant has supported our wide range of research activities for over a decade. The reports contained here summarize the latest work done by our research team. Task A (Collider Physics Program): CMS & CDF Profs. T. Kamon, A. Safonov, and D. Toback co-lead the Texas A&M (TAMU) collider program focusing on CDF and CMS experiments. Task D: Particle Physics Theory Our particle physics theory task is the combined effort of Profs. B. Dutta, D. Nanopoulos, and C. Pope. Task E (Underground Physics): LUX & NEXT Profs. R. Webb and J. White(deceased) lead the Xenon-based underground research program consisting of two main thrusts: the first, participation in the LUX two-phase xenon dark matter search experiment and the second, detector R&D primarily aimed at developing future detectors for underground physics (e.g. NEXT and LZ).

  9. Remedial actions at the former Vitro Rare Metals plant site, Canonsburg, Washington County, Pennsylvania. Final Environmental Impact Statement. Volume II. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1983-07-01

    This report provides a summary of the conceptual design and other information necessary to understand the proposed remedial action at the expanded Canonsburg, Pennsylvania site. This design constitutes the current approach to stabilizing the radioactively contaminated materials in place in a manner that would fully protect the public health and environment. This summary is intended to provide sufficient detail for the reader to understand the proposed remedial action and the anticipated environmental impacts. The site conceptual design has been developed using available data. In some cases, elements of the design have not been developed fully and will be made final during the detailed design process.

  10. Remedial actions at the former Vitro Rare Metals plant site, Canonsburg, Washington County, Pennsylvania. Final Environmental Impact Statement. Volume II. Appendices

    International Nuclear Information System (INIS)

    1983-07-01

    This report provides a summary of the conceptual design and other information necessary to understand the proposed remedial action at the expanded Canonsburg, Pennsylvania site. This design constitutes the current approach to stabilizing the radioactively contaminated materials in place in a manner that would fully protect the public health and environment. This summary is intended to provide sufficient detail for the reader to understand the proposed remedial action and the anticipated environmental impacts. The site conceptual design has been developed using available data. In some cases, elements of the design have not been developed fully and will be made final during the detailed design process

  11. Called to Teach: Percy and Anna Pennybacker's Contributions to Education in Texas, 1880-1899

    Science.gov (United States)

    King, Kelley M.

    2012-01-01

    In 1879, with aid from the Peabody fund, Texas's first tax-supported teacher training institution, Sam Houston State Normal Institute (SHNI), opened on the site of the old Austin College in Huntsville (Richmond 1941, 37). The need for qualified educators in Texas was growing as the state struggled to make up for decades of neglect of and antipathy…

  12. 78 FR 53426 - Expansion of Foreign-Trade Zone 84; Houston, Texas

    Science.gov (United States)

    2013-08-29

    ... 84; Houston, Texas Pursuant to its authority under the Foreign-Trade Zones Act of June 18, 1934, as..., the Port of Houston Authority, grantee of Foreign-Trade Zone 84, submitted an application to the Board for authority to expand FTZ 84 to include a site in Brazos County, Texas, adjacent to the Houston...

  13. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada (Revision No. 0, August 2001); FINAL

    International Nuclear Information System (INIS)

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the characterization and closure of Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, as identified in the Federal Facility Agreement and Consent Order (FFACO). The CAU, located on the Nevada Test Site in Nevada, consists of seven Corrective Action Sites (CASs): CAS 03-04-01, Area 3 Change House Septic System; CAS 03-09-01, Mud Pit Spill Over; CAS 03-09-03, Mud Pit; CAS 03-09-04, Mud Pit; CAS 03-09-05, Mud Pit; CAS 20-16-01, Landfill; CAS 20-22-21, Drums. Sufficient information and process knowledge from historical documentation and investigations are the basis for the development of the phased approach chosen to address the data collection activities prior to implementing the preferred closure alternative for each CAS. The Phase I investigation will determine through collection of environmental samples from targeted populations (i.e., mud/soil cuttings above textural discontinuity) if contaminants of potential concern (COPCs) are present in concentrations exceeding preliminary action levels (PALs) at each of the CASs. If COPCs are present above PALs, a Phase II investigation will be implemented to determine the extent of contamination to support the appropriate corrective action alternative to complete closure of the site. Groundwater impacts from potentially migrating contaminants are not expected due to the depths to groundwater and limiting hydrologic drivers of low precipitation and high evaporation rates. Future land-use scenarios limit future uses to industrial activities; therefore, future residential uses are not considered. Potential exposure routes to site workers from contaminants of concern in septage and soils include oral ingestion, inhalation, or dermal contact (absorption) through in-advertent disturbance of contaminated structures and/or soils. Diesel within drilling muds is expected to be the primary COPC based on process

  14. Site-specific probabilistic seismic hazard analyses for the Idaho National Engineering Laboratory. Volume 1: Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This report describes and summarizes a probabilistic evaluation of ground motions for the Idaho National Engineering Laboratory (INEL). The purpose of this evaluation is to provide a basis for updating the seismic design criteria for the INEL. In this study, site-specific seismic hazard curves were developed for seven facility sites as prescribed by DOE Standards 1022-93 and 1023-96. These sites include the: Advanced Test Reactor (ATR); Argonne National Laboratory West (ANL); Idaho Chemical Processing Plant (ICPP or CPP); Power Burst Facility (PBF); Radioactive Waste Management Complex (RWMC); Naval Reactor Facility (NRF); and Test Area North (TAN). The results, probabilistic peak ground accelerations and uniform hazard spectra, contained in this report are not to be used for purposes of seismic design at INEL. A subsequent study will be performed to translate the results of this probabilistic seismic hazard analysis to site-specific seismic design values for the INEL as per the requirements of DOE Standard 1020-94. These site-specific seismic design values will be incorporated into the INEL Architectural and Engineering Standards

  15. Final report on decommissioning of wells, boreholes, and tiltmeter sites, Gulf Coast Interior Salt Domes of Louisiana

    International Nuclear Information System (INIS)

    1989-07-01

    In the late 1970s, test holes were drilled in northern Louisiana in the vicinity of Vacherie and Rayburn's Salt Domes as part of the Department of Energy's (DOE) National Waste Terminal Storage (NWTS) (rename the Civilian Radioactive Waste Management (CRWM)) program. The purpose of the program was to evaluate the suitability of salt domes for long term storage or disposal of high-level nuclear waste. The Institute for Environmental Studies at Louisiana State University (IES/LSU) and Law Engineering Testing Company (LETCo) of Marietta, Georgia performed the initial field studies. In 1982, DOE awarded a contract to the Earth Technology Corporation (TETC) of Long Beach, California to continue the Gulf Coast Salt Dome studies. In 1986, DOE deferred salt domes from further consideration as repository sites. This report describes test well plugging and site abandonment activities performed by SWEC in accordance with Activity Plan (AP) 1--3, Well Plugging and Site Restoration of Work Sites in Louisiana. The objective of the work outlined in this AP was to return test sites to as near original condition as possible by plugging boreholes, removing equipment, regrading, and seeding. Appendices to this report contain forms required by State of Louisiana, used by SWEC to document decommissioning activities, and pertinent documentation related to lease/access agreements

  16. Final report on decommissioning of wells, boreholes, and tiltmeter sites, Gulf Coast Interior Salt Domes of Louisiana

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    In the late 1970s, test holes were drilled in northern Louisiana in the vicinity of Vacherie and Rayburn`s Salt Domes as part of the Department of Energy`s (DOE) National Waste Terminal Storage (NWTS) (rename the Civilian Radioactive Waste Management (CRWM)) program. The purpose of the program was to evaluate the suitability of salt domes for long term storage or disposal of high-level nuclear waste. The Institute for Environmental Studies at Louisiana State University (IES/LSU) and Law Engineering Testing Company (LETCo) of Marietta, Georgia performed the initial field studies. In 1982, DOE awarded a contract to the Earth Technology Corporation (TETC) of Long Beach, California to continue the Gulf Coast Salt Dome studies. In 1986, DOE deferred salt domes from further consideration as repository sites. This report describes test well plugging and site abandonment activities performed by SWEC in accordance with Activity Plan (AP) 1--3, Well Plugging and Site Restoration of Work Sites in Louisiana. The objective of the work outlined in this AP was to return test sites to as near original condition as possible by plugging boreholes, removing equipment, regrading, and seeding. Appendices to this report contain forms required by State of Louisiana, used by SWEC to document decommissioning activities, and pertinent documentation related to lease/access agreements.

  17. Evaluation of shale hosted low-level waste disposal sites in semi-arid environments: Final report

    International Nuclear Information System (INIS)

    Roggenthen, W.M.; Rahn, P.H.; Arthur, R.C.; Miller, J.R.; Bangsund, W.J.; Eberlin, J.

    1985-09-01

    This report covers the findings of a multidisciplinary investigation intended to delineate critical factors and concerns associated with shale hosted, low-level radioactive waste disposal sites located in semiarid environments. The investigations focus primarily upon concerns regarding the hydrology, geochemistry, and meteorology of such an environment. The studies described within this report specifically do not constitute an evaluation of any one particular site nor even a particular class of sites. Rather, it is the intention of the report to present data and insights that would assist private concerns and governmental agencies in the efficient and prudent development of such disposal areas. This report assumes that the hypothetical waste site in question would be developed as a trench type operation similar to that used at Barnwell, South Carolina, with variations upon the techniques used at Beatty Flat, Nevada, and Hanford, Washington. The trench design (Figures 1 and 2) is assumed to be similar to that generic design described in ''Procedures and Technology for Shallow Land Burial, DOE/LLw-13Td, 1983) although it is also assumed that improvements and adaptations will be made upon this basic design to meet the individual needs of a particular site. During the preparation of this report it became apparent that new types of trench design are being studied. Discussions of these trench design proposals are not central to this report. The examples of trench design in Figures 1 and 2 are presented only to give an idea as to the general philosophy of construction of shallow burial facilities

  18. No advantages in terms of safety. 'Energy in a Dialog' about the 'Final disposal site selection law'

    International Nuclear Information System (INIS)

    Anon.

    2013-01-01

    The current legislative process for the site selection law (StandAG) was topic of the DAtF event 'Energy in a Dialog' on 6 June 2013 in Berlin: 'Is the path the goal: purpose and results of the site selection law'. The President of the German Atomic Forum (DAtF), Dr. Ralf Gldner, moderated the discussion with Prof. Dr. Ortwin Renn of the University of Stuttgart and the CEO of the Gesellschaft fuer Nuklear-Service (GNS), Hannes Wimmer. The opportunities and risks of a new site search for high-level radioactive waste were the main topics. Professor Renn summarized some findings to conditions of acceptance perceived in connection with industrial projects. Dr. Wimmer said in his keynote that social acceptance for site selection for a repository must be maintained for a long time. During the ensuing discussion, a common understanding was evident on some aspects of the topic. This is especially true for a limitation of the new location search method in terms of its objective. As a realistic objective to determine a secure suitable site was considered instead of a 'best' location proposed by the new law. (orig.)

  19. Estimating release of polycyclic aromatic hydrocarbons from coal-tar contaminated soil at manufactured gas plant sites. Final report

    International Nuclear Information System (INIS)

    Lee, L.S.

    1998-04-01

    One of EPRI's goals regarding the environmental behavior of organic substances consists of developing information and predictive tools to estimate the release potential of polycyclic aromatic hydrocarbons (PAHs) from contaminated soils at manufactured gas (MGP) plant sites. A proper assessment of the distribution of contaminants under equilibrium conditions and the potential for mass-transfer constraints is essential in evaluating the environmental risks of contaminants in the subsurface at MGP sites and for selecting remediation options. The results of this research provide insights into estimating maximum release concentrations of PAHs from MGP soils that have been contaminated by direct contact with the tar or through years of contact with contaminated groundwater. Attention is also given to evaluating the use of water-miscible cosolvents for estimating aqueous phase concentrations, and assessing the role of mass-transfer constraints in the release of PAHs from MGP site soils

  20. Review of site recommendation process in Draft Environmental Assessments

    International Nuclear Information System (INIS)

    Joy, H.; Longo, T.; Burton, E.S.

    1985-01-01

    In December 1984, the US Department of Energy (DOE) published Draft Environmental Assessments (EAs) on nine potentially acceptable nuclear waste repository sites. Five sites in the states of Mississippi, Nevada, Texas, Utah, and Washington were proposed in the Draft EAs for nomination under the Nuclear Waste Policy Act as suitable for further detailed study (site characterization). The Nevada, Texas, and Washington sites were further proposed for recommendation to the President as preferred for site characterization. This paper reviews the process that DOE used in selecting the three sites proposed for site characterization. The process is consistent with DOE's implementation guidelines for selecting repository sites, and proceeds in three steps. First, the sites are ranked in order of preference for each of twenty technical guidelines based on information in the Draft EAs. The second step combines the individual guideline rankings into postclosure and preclosure guideline group rankings, and, finally, into an overall ranking. In the third step, the sensitivity of the choice of the three preferred sites is examined for a range of guideline weightings

  1. Can Texas' Physicians Be as Diverse as Texas?

    Science.gov (United States)

    Price, Sean

    2017-07-01

    The United States and Texas have a chronic shortage of doctors, but the shortage of minority physicians is even more acute. To address this, and the health disparities that come with it, Texas medical schools are working to increase minority enrollment, but challenges remain.

  2. Formerly utilized MED/AEC sites remedial action program: radiological survey of the Building Site 421, United States, Watertown Arsenel, Watertown, MA. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-02-01

    This report contains the results of surveys of the current radiological condition of the Building Site 421, United States Arsenal Watertown, Watertown, Massachusetts. Findings of this survey indicate there are four spots involving an area of less than 6000 cm/sup 2/ of identifiable low-level residual radioactivity on the concrete pad which is all that remains of Building Site 421. The largest spot is approximately 5000 cm/sup 2/. The other three spots are 100 cm/sup 2/ or less. The beta-gamma readings at these spots are 8.4 x 10/sup 2/ dis/min-100 cm/sup 2/, 2.2 x 10/sup 5/ dis/min-100 cm/sup 2/, 2.2 x 10/sup 5/ dis/min-100 cm/sup 2/ and 8.5 x 10/sup 4/ dis/min-100 cm/sup 2/. No alpha contamination was found at these locations. Gamma spectral analysis of a chip of contaminated concrete from one of the spots indicates that the contaminant is natural uranium. This contamination is fixed in the concrete and does not present an internal or external exposure hazard under present conditions. A hypothetical hazard analysis under a conservative set of assumed conditions indicates minimal internal hazard. The highest End Window contact reading was 0.09 mR/h. None of the other three spots indicated an elevated direct reading with the End Window Detector. Radon daughter concentrations were determined at three locations on the Building 421 pad. These were 0.00013 WL, 0.00011 WL and 0.00009 WL. According to the Surgeon General's Guidelines found in 10 CFR 712, radon daughter concentrations below 0.03 WL do not require remedial action in structures other than private dwellings and schools. Soil samples taken about the site indicate no elevated levels above the natural background levels in the soil. A gamma spectral analysis of a water sample obtained from the storm sewer line near the Building 421 pad indicates no elevated radioactivity in the sample. It was therefore felt that no contamination is present in this sewer.

  3. Formerly utilized MED/AEC sites remedial action program: radiological survey of the Building Site 421, United States, Watertown Arsenel, Watertown, MA. Final report

    International Nuclear Information System (INIS)

    1980-02-01

    This report contains the results of surveys of the current radiological condition of the Building Site 421, United States Arsenal Watertown, Watertown, Massachusetts. Findings of this survey indicate there are four spots involving an area of less than 6000 cm 2 of identifiable low-level residual radioactivity on the concrete pad which is all that remains of Building Site 421. The largest spot is approximately 5000 cm 2 . The other three spots are 100 cm 2 or less. The beta-gamma readings at these spots are 8.4 x 10 2 dis/min-100 cm 2 , 2.2 x 10 5 dis/min-100 cm 2 , 2.2 x 10 5 dis/min-100 cm 2 and 8.5 x 10 4 dis/min-100 cm 2 . No alpha contamination was found at these locations. Gamma spectral analysis of a chip of contaminated concrete from one of the spots indicates that the contaminant is natural uranium. This contamination is fixed in the concrete and does not present an internal or external exposure hazard under present conditions. A hypothetical hazard analysis under a conservative set of assumed conditions indicates minimal internal hazard. The highest End Window contact reading was 0.09 mR/h. None of the other three spots indicated an elevated direct reading with the End Window Detector. Radon daughter concentrations were determined at three locations on the Building 421 pad. These were 0.00013 WL, 0.00011 WL and 0.00009 WL. According to the Surgeon General's Guidelines found in 10 CFR 712, radon daughter concentrations below 0.03 WL do not require remedial action in structures other than private dwellings and schools. Soil samples taken about the site indicate no elevated levels above the natural background levels in the soil. A gamma spectral analysis of a water sample obtained from the storm sewer line near the Building 421 pad indicates no elevated radioactivity in the sample. It was therefore felt that no contamination is present in this sewer

  4. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado. Appendix A of Attachment 3: Calculations, Final

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This report contains calculations for: hydraulic gradients for Alluvial Aquifer and Salt Wash Aquifer; slug test analysis to determine hydraulic conductivity for Alluvial Aquifer and Salt Wash Aquifer; average linear groundwater velocity for Alluvial Aquifer and Salt Wash Aquifer; statistical analysis of the extent of existing groundwater contamination; hydraulic gradients for Dakota/Burro Canyon Formation and Salt Wash Aquifer; slug test analysis to determine hydraulic conductivity for Dakota/Burro Canyon Formation and Perched Salt Wash Aquifer; determination of hydraulic conductivity of the Dakota/Burro Canyon Formation from Packer Tests; average linear groundwater velocity for Dakota/Burro Canyon and Salt Wash Aquifer; chemical and mineralogical characterization of core samples from the Dry Flats Disposal Site; and demonstration of low groundwater yield from Uppermost Aquifer.

  5. Multi-site magnetotelluric measurement system with real-time data analysis. Final technical report No. 210

    Energy Technology Data Exchange (ETDEWEB)

    Becker, J.D.; Bostick, F.X. Jr.; Smith, H.W.

    1981-09-01

    A magnetotelluric measurement system has been designed to provide a more cost effective electrical method for geothermal and mineral exploration. The theoretical requirements and sensitivities of the magnetotelluric inversion process were specifically addressed in determining system performance requirements. Significantly reduced instrument noise levels provide improved data quality, and simultaneous measurement at up to six locations provides reduced cost per site. Remotely located, battery powered, instrumentation packages return data to a central controlling site through a 2560 baud wire-line or radio link. Each remote package contains preamplifiers, data conditioning filters, and a 12-bit gain ranging A-D converter for frequencies from 0.001 Hz to 8 Hz. Data frequencies above 8 Hz are processed sequentially by a heterodyne receiver to reduce bandwidth to within the limits of the 2560 baud data link. The central data collection site provides overall control for the entire system. The system operator interacts with the system through a CRT terminal, and he receives hard copy from a matrix graphics printer. Data from the remote packages may be recorded in time sequence on a magnetic tape cartridge system, or an optional Hewlett-Packard 21MX minicomputer can be used to perform real-time frequency analysis. The results of this analysis provide feedback to the operator for improved evaluation of system performance and for selection of future measurement sites.

  6. Superfund Record of Decision (EPA Region 4): Maxey Flats Nuclear Disposal site, Fleming County, KY. (First remedial action), September 1991. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    The 280-acre Maxey Flats Nuclear Disposal site is an inactive low-level radioactive waste disposal facility in Fleming County, Kentucky. The estimated 663 people who reside within 2.5 miles of the site use the public water supply for drinking purposes. From 1962 to 1977, Nuclear Engineering Company, Inc. (NECO), operated a solid by-product, source, and special nuclear material disposal facility under a license with the State. Several State investigations in the 1970's revealed that leachate contaminated with tritium and other radioactive substances was migrating from the disposal trenches to unrestricted areas. The Record of Decision (ROD) addresses final remediation of soil, debris, and associated leachate. The primary contaminants of concern affecting the soil and debris are VOCs including benzene, TCE, and toluene; metals including arsenic and lead; and radioactive materials. The selected remedial action for the site is included

  7. Forests of East Texas, 2014

    Science.gov (United States)

    Thomas J. Brandeis

    2015-01-01

    This resource update provides an overview of forest resources in east Texas derived from an inventory conducted by the U.S. Forest Service, Forest Inventory and Analysis (FIA) Program at the Southern Research Station in cooperation with the Texas A&M Forest Service. These estimates are based on field data collected using the FIA annualized sample design and are...

  8. Forests of east Texas, 2013

    Science.gov (United States)

    K.J.W. Dooley; T.J. Brandeis

    2014-01-01

    This resource update provides an overview of forest resources in east Texas based on an inventory conducted by the U.S. Forest Service, Forest Inventory and Analysis (FIA) program at the Southern Research Station in cooperation with the Texas A&M Forest Service. Forest resource estimates are based on field data collected using the FIA annualized sample design and...

  9. CBTE: The Ayes of Texas

    Science.gov (United States)

    Houston, W. Robert; Howsam, Robert B.

    1974-01-01

    A heated controversy occurred when the Texas State Board of Education mandated competency based teacher education (CBTE) for all of the State's 66 teacher preparatory institutions. This is an account of developments in Texas by two major proponents of CBTE. (Author/JF)

  10. Tooele Army Depot Revised Final Site-Wide Ecological Risk Assessment. Volume II (Appendices A through D).

    Science.gov (United States)

    1998-02-01

    diet of higher trophic level species, such as raptors. Ord’s Kangaroo Rat (Dipodomys ordii). The Ord’s kangaroo rat is chiefly a nocturnal mammal...sandy soils. The entrances of these burrow systems are plugged during the day to maintain humidity and coolness. The kangaroo rat can obtain...sufficient quantities of water from the metabolism of food in their diet, but will drink water when it is available. TSK 0003/SWERA/Rev Final Rpt/November

  11. Assessment of national systems for obtaining local siting acceptance of nuclear-waste-management facilities (1981). Final report

    International Nuclear Information System (INIS)

    1981-01-01

    There is a rich mixture of formal and informal approaches being used in our sister nuclear democracies in their attempts to deal with the difficulties in obtaining local siting acceptance of national waste management facilities. Some of these are meeting with a degree of success not yet achieved in the US. Although this survey documents and assesses many of these approaches, the scope of the study did not include an assessment of their relevance to common problems in the US. It would appear that in addition to a periodic updating of the approaches and progress of other countries in dealing with the siting of nuclear waste facilities, an assessment of the applicability of the more successful of these approaches to the US political system could make good use of the information developed in the preparation of this report

  12. Evaluation of advanced gas chromatographs for on-site analysis. Final CRADA report for number Y-1295-0374

    Energy Technology Data Exchange (ETDEWEB)

    Wise, M.B.; Guerin, M.R.; Palausky, A.; Merriweather, R. [Lockheed Martin Energy Research, Oak Ridge, TN (United States); Forsberg, R.E. [Mine Safety Appliances-Baseline Industries, Lyons, CO (United States)

    1997-02-21

    The EKHO gas chromatography (GC) is being marketed by Mine Safety Appliances as an instrument for on-site environmental analysis and for process applications. This GC utilizes a unique bundled capillary column produced in Russia that provides very fast analysis and a wide linear dynamic range. Oak Ridge National Laboratory (ORNL) has been involved in a CRADA with Mine Safety Appliances in order to evaluate the analytical performance of the EKHO GC and is suitability for on-site environmental applications. Tests that were performed at ORNL included the analysis of air, water, and soil samples for aromatic hydrocarbons including benzene, toluene, xylene, and ethylbenzene (BTEX). These compounds were selected in order to simulate contamination by gasoline and other petroleum fuels. Performance factors that were studied included the instrument detection limits, the linearity, dynamic range, and precision for replicate samples. Other factors that were evaluated include the ease of set-up and operation.

  13. Interrelation of technologies for RW preparation and sites for final isolation of the wastes from pyrochemical processing of SNF

    Energy Technology Data Exchange (ETDEWEB)

    Gupalo, V.S.; Chistyakov, V.N. [JSC - Design-Prospecting and Scientific-Research Institute of Industrial Technology -, Kashirskoye Highway, 33, Moscow 115409 (Russian Federation); Kormilitsyn, M.V.; Kormilitsyna, L.A. [JSC - State Scientific Center - Research Institute of Atomic Reactors -, Ulyanovsk region, Dimitrovgrad - 10, 433510 (Russian Federation)

    2013-07-01

    For the justification of engineering solutions and practical testing of the radiochemical component of the perspective nuclear power complex with on-site variant of nuclear fuel cycle (NFC), it is planned to establish a multi-functional research-development complex (MFCRC) for radiochemical processing of spent nuclear fuels (SNF) from fast reactors. MFCRC is being established at the NIIAR site, it comprises technological process lines, where innovation pyro-electrochemical and hydrometallurgical technologies are realized, with an option for closing the inter-chain material flows for testing the combined radiochemically converted materials. The technological flowchart for processing at the MFCRC is subdivided into 3 segments: -) complex of the lead operations for dismantling the fuel elements (FE) and fuel assemblies (FA), -) pyrochemical extraction flowchart for processing SNF, and -) hydrometallurgical flowchart for processing SNF. The engineered solutions for the management and disposition of the radioactive wastes from MFCRC are reviewed.

  14. West Hackberry Strategic Petroleum Reserve site brine-disposal monitoring, Year I report. Volume III. Biological oceanography. Final report

    Energy Technology Data Exchange (ETDEWEB)

    DeRouen, L.R.; Hann, R.W.; Casserly, D.M.; Giammona, C.; Lascara, V.J. (eds.)

    1983-02-01

    The Department of Energy's Strategic Petroleum Reserve Program began discharging brine into the Gulf of Mexico from its West Hackberry site near Cameron, Louisiana in May 1981. The brine originates from underground salt domes being leached with water from the Intracoastal Waterway, making available vast underground storage caverns for crude oil. The effects of brine discharge on aquatic organisms are presented in this volume. The topics covered are: benthos; nekton; phytoplankton; zooplankton; and data management.

  15. Evaluation of water quality conditions near proposed fish production sites associated with the Yakima Fisheries Project. Final report

    International Nuclear Information System (INIS)

    Dauble, D.d.; Mueller, R.P.; Martinson, G.A.

    1994-05-01

    In 1991, the Pacific Northwest Laboratory (PNL) began studying water quality at several sites in the Yakima River Basin for the Bonneville Power Administration. These sites were being proposed as locations for fish culture facilities as part of the Yakima Fisheries Project (YFP). Surface water quality parameters near the proposed fish culture facilities are currently suitable for fish production. Water quality conditions in the mainstream Yakima River and its tributaries are generally excellent in the upper part of the watershed (i.e., near Cle Elum), but they are only fair to poor for the river downstream of Union Gap (river mile 107). Water quality of the Naches River near Oak Flats is also suitable for fish production. Groundwater supplies near the proposed fish production facilities typically have elevated concentrations of metals and dissolved gases. These conditions can be mitigated using best engineering practices such as precipitation and degasification. Additionally, mixing with surface water may improve these conditions. Depending on the location and depth of the well, groundwater temperatures may be warmer than optimum for acclimating and holding juvenile and adult fish. Water quality parameters measured in the Yakima River and tributaries sometimes exceed the range of values described as acceptable for culture of salmonids and for the protection of other aquatic life. However, constituent concentrations are within ranges that exist in many northwest fish hatcheries. Additionally, site-specific tests conducted by PNL (i.e., live box exposures and egg incubation studies) indicate that fish can be successfully reared in surface and well water near the proposed facility sites. Thus, there appear to be no constraints to artificial production for the YFP

  16. Site-specific evaluation of safety issues for high-level waste disposal in crystalline rocks. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Jobmann, M. (ed.) [DBE Technology GmbH, Peine (Germany)

    2016-03-31

    In the past, German research and development (R and D) activities regarding the disposal of radioactive waste, including spent nuclear fuel, focused mainly on domal rock salt because rock salt was the preferred host rock formation. In addition, generic R and D work regarding alternative host rocks (crystalline rocks and claystones) had been performed as well for a long time but with lower intensity. Around the year 2000, as a consequence of the moratorium on the Gorleben site, the Federal Government decided to have argillaceous rocks and crystalline rocks investigated in more detail. As Germany does not have any underground research and host rock characterization facilities, international cooperation received a high priority in the German R and D programme for high-level waste (HLW) disposal in order to increase the knowledge regarding alternative host rocks. Major cornerstones of the cooperation are joint projects and experiments conducted especially in underground research laboratories (URL) in crystalline rocks at the Grimsel Test Site (Switzerland) and the Hard Rock Laboratory (HRL) Aespoe(Sweden) and in argillaceous rocks at the URL Mont Terri (Switzerland) and Bure (France). In 2001, the topic of radioactive waste disposal was integrated into the agreement between the former Russian Ministry of Atomic Energy (Minatom, now Rosatom) and the German Ministry of Labor (BMWA), now Ministry of Economic Affairs and Energy (BMWi), on cooperation regarding R and D on the peaceful utilization of nuclear power (agreement on ''Wirtschaftlich-Technische Zusammenarbeit'' WTZ). The intention was to have a new and interesting opportunity for international R and D cooperation regarding HLW disposal in crystalline rocks and the unique possibility to perform site-specific work, to test the safety demonstration tools available, and to expand the knowledge to all aspects specific to these host rocks. Another motivation for joining this cooperation was the

  17. Tiger Team Assessment of the Pantex Plant, Amarillo, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1990-02-01

    This document contains the findings and associated root causes identified during the Tiger Team Assessment of the Department of Energy's (DOE) Pantex Plant in Amarillo, Texas. This assessment was conducted by the Department's Office of Environment, Safety and Health between October 2 and 31, 1989. The scope of the assessment of the Pantex Plant covered all areas of environment, safety and health (ES H) activities, including compliance with federal, state, and local regulations, requirements, permits, agreements, orders and consent decrees, and DOE ES H Orders. The assessment also included an evaluation of the adequacy of DOE and site contractor ES H management programs. The draft findings were submitted to the Office of Defense Programs, the Albuquerque Operations Office, the Amarillo Area Office, and regulatory agencies at the conclusion of the on-site assessment activities for review and comment on technical accuracy. Final modifications and any other appropriate changes have been incorporated in the final report. The Tiger Team Assessment of the Pantex Plant is part of the larger Tiger Team Assessment program which will encompass over 100 DOE operating facilities. The assessment program is part of a 10-point initiative announced by Secretary of Energy James D. Watkins on June 27, 1989, to strengthen environmental protection and waste management activities in the Department. The results of the program will provide the Secretary with information on the compliance status of DOE facilities with regard to ES H requirements, root causes for noncompliance, adequacy of DOE and site contractor ES H management programs, and DOE-wide ES H compliance trends.

  18. Evaluation and combined geophysical interpretations of NURE and related geoscience data in the Van Horn, Pecos, Marfa, Fort Stockton, Presidido, and Emory Peak quadrangles, Texas. Volume 1. Final report

    International Nuclear Information System (INIS)

    Keller, G.R.; Hinze, W.J.; Aiken, C.L.V.; Goodell, P.C.; Roy, R.F.; Pingitore, N.E.

    1981-09-01

    This report (two volumes) is the culmination of a two-year study of the six Trans-Pecos Texas quadrangles (Van Horn, Pecos, Marfa, Fort Stockton, Presidio, and Emory Park) surveyed as part of the National Uranium Resource Evaluation (NURE) program. Volume I contains a discussion of the aeromagnetic, gravity and geochemical data, their processing, and their analysis. The geologic history and setting of the Trans-Pecos are discussed along with the uranium potential of the region. Uranium anomalies and occurrences characteristic of numerous different NURE classes are present in the study area, and information is presented on 33 drill holes into these targets. Volume II is a folio of maps reduced to a scale of 1:500,000. Geologic maps for each of the six quadrangles are included and the geophysical maps have been prepared to be overlays for the goelogic maps. In addition to the geologic maps, residual aeromagnetic anomaly, complete Bouguer gravity anomaly, flight line index, gravity station index, and anomaly interpretative maps were prepared for each quadrangle. A large suite of digitally processed maps of gravity and aeromagnetic data were prepared and are included in Volume II

  19. Superfund record of decision (EPA Region 4): Ciba-Geigy Site (McIntosh Plant), Washington County, McIntosh, AL. (Third remedial action), July 1992. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    The 1,500-acre Ciba-Geigy site is an active chemical manufacturer in an industrial area in McIntosh, Washington County, Alabama. A wetlands area borders the site property, and part of the site lies within the floodplain of the Tombigbee River. In 1985, EPA issued a RCRA permit that included a corrective action plan requiring Ciba-Geigy to remove and treat ground water and surface water contamination at the site. Further investigations by EPA revealed 11 former waste management areas of potential contamination onsite. These areas contain a variety of waste, debris, pesticide by-products and residues. The ROD addresses a final remedy for OU4, which includes contaminated soil and sludge in former waste management Area 8 and the upper dilute ditch. The primary contaminants of concern affecting the soil, sludge, and debris are VOCs, including benzene, toluene, and xylenes; other organics, including pesticides; metals, including arsenic, chromium, and lead; and inorganics, including cyanide. The selected remedial action for the site are included

  20. An opinion survey on the image of incidents or accidents at a final disposal site for high-level radioactive waste

    International Nuclear Information System (INIS)

    Tanigaki, Toshihiko

    2008-01-01

    Previous studies show that a major psychological factor of attitudes toward final disposal sites for high-level radioactive waste (hereinafter referred to as 'disposal sites') is risk perception. On the basis of this finding, the present survey attempted to identify mental images of assumable incidents and accidents likely to occur at disposal sites. Specifically, 402 respondents in the Kansai Area were asked to describe their mental image of what kind/level of incident or accident could possibly occur at a Disposal Site by what cause and what size of damage was expectable from such incident/accident. The results showed that following: regarding assumable incidents/accidents (1) people are most afraid of a large-scale natural disaster including a major earthquake beyond an assumed level of intensity, that they feel would probably generate the heaviest damage, (2) people assume that no major accident leading to serious damage is likely to occur in the early days after the launch of operation, (3) people have an impression that the longer the passage of time, the higher the probability of incident/accident occurrence becomes, regardless of the size of resulting damage. Those who strongly feel that Disposal Sites are dangerous are, when compared to others who do not have such a strong impression, apt to overestimate the size of assumable damage regardless of the cause of damage and also to overestimate the growth rate of the probability of incident/accident occurrence over the course of time. (author)

  1. Recommendations for the management of old uranium mining sites in France. From Limousin sites to other sites, from short- to medium- and long-terms. Final report of the pluralist expertise group on Limousin uranium mines (GEP). Synthesis and final report

    International Nuclear Information System (INIS)

    2010-01-01

    The final report of the Pluralistic Experts Group for the Uranium mines of Limousin (GEP) brings together the main conclusions and recommendations arising from three and half years of work having mobilized, at the request and with the financial support of French authorities, more than forty experts from a varying range of disciplines and backgrounds. The mission given to GEP by the Ministers of Ecology, Industry and Health, as well as the President of the Nuclear safety Authority, was ambitious. It was not simply a matter of conducting an exhaustive and vigorous investigation of actual impacts, but also to analyse the present situation from a technical point of view starting with actual cases to clarify the options for management and monitoring, and to make recommendations on their development in order to reduce the current impacts and to foresee those in the long term according to the preparation of a long term plan. This final report attempts to develop a coherent framework of recommendations that are as operationally feasible as possible. Thus, the proposals of the GEP underline the need for an comprehensive approach, on the basis of work on the institutional perspectives, of a programme for improvement of knowledge and including a reinforcement of information and dialogue, to frame and guide the characterization of the risks and impacts, the evolution of the surveillance devices and the consolidation of the existing protection systems. These final proposals take account of a whole range of activities undertaken by Areva NC as well as the relevant local and national government organizations; and which integrate certain recommendations already produced by the GEP within the framework of its three interim reports. The GEP sets out six main areas of improvements, within which the GEP makes 15 major recommendations addressed to the public authorities, the owner and all of the stakeholders concerned. These recommendations, largely detailed in the report, aim to: - 1

  2. Well-Integrity Survey (Phase II) of Abandoned Homestead Water Wells in the High Plains Aquifer, Former Pantex Ordnance Plant and Texas Tech Research Farm Near Amarillo, Texas, 1995

    National Research Council Canada - National Science Library

    Rivers, Glenn A

    1995-01-01

    This report describes the methods used and the results obtained during a field search for abandoned homestead sites and water wells at the former Pantex Ordnance Plant and Texas Tech Research Farm (Pantex site...

  3. Final environmental impact statement, interim management of nuclear materials, Savannah River Site, Aiken, South Carolina (DOE/EIS-0220)

    Energy Technology Data Exchange (ETDEWEB)

    Grainger, A R

    1995-10-01

    This document evaluates the potential environmental impacts of alternatives for the stabilization of nuclear materials currently stored at various locations on the Savannah River Site (SRS). These materials remain from past defense-related production, testing, and other activities at the SRS and from chemical separations and related activities that DOE suspended in 1992. The EIS analyzes the following alternatives: Continuing Storage (No Action), Processing to Metal, Processing to Oxide, Blending Down to Low Enriched Uranium, Processing and Storage for Vitrification in the Defense Waste Processing Facility, Vitrification (F-Canyon), and Improving Storage. The preferred alternatives cover a combination of these in relation to the different types of material.

  4. Development of a design basis tornado and structural design criteria for the Nevada Test Site, Nevada. Final report

    International Nuclear Information System (INIS)

    McDonald, J.R.; Minor, J.E.; Mehta, K.C.

    1975-06-01

    In order to evaluate the ability of critical facilities at the Nevada Test Site to withstand the possible damaging effects of extreme winds and tornadoes, parameters for the effects of tornadoes and extreme winds and structural design criteria for the design and evaluation of structures were developed. The meteorological investigations conducted are summarized, and techniques used for developing the combined tornado and extreme wind risk model are discussed. The guidelines for structural design include methods for calculating pressure distributions on walls and roofs of structures and methods for accommodating impact loads from wind-driven missiles. Calculations for determining the design loads for an example structure are included

  5. 76 FR 44898 - Texas Eastern Transmission, LP; Notice of Application

    Science.gov (United States)

    2011-07-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-508-000] Texas Eastern... lateral line transportation service to the Grays Ferry Cogeneration Partnership (Grays Ferry) and..., the anticipated date for the Commission staff's issuance of the final environmental impact statement...

  6. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    None

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings, and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.

  7. Engineering geology study of demo plant radioactive waste final disposal site of medium depth NSD type at Puspiptek, Serpong

    International Nuclear Information System (INIS)

    Heri Syaeful; Sucipta; Imam Achmad Sadisun

    2014-01-01

    Final disposal of radioactive waste intended to keep radioactive substances does not released to the environment until the substance activity decreased to the safe level. Storage concept of radioactive waste (RAW) final disposal that will be developed at the area of Puspiptek, Serpong is near surface disposal (NSD). Based on depth, NSD divided on two type, near surface NSD and medium depth NSD. Concept NSD in this research is medium depth NSD, which is between 30 – 300 meters. During NSD construction in medium-depth required the works of sub-surface excavation or tunneling. Analysis of in-situ stresses and sub-surface deformation performed to recognize the stress magnitude and its distribution that developed in soil/rock as well as the deformation occurred when sub-surface excavation takes place. Based on the analysis, acknowledged the magnitude of tensional and compression stress and its distribution that range from -441 kPa to 4,028 kPa with values of natural deformation or without reinforcement between 4.4 to 13.5 cm. A rather high deformation value which is achieved 13.5 cm leads to necessity of engineering reinforcement during excavation. The designs of engineering reinforcement on every excavation stage refer to the result of modeling analysis of stress and deformation distribution pattern. (author)

  8. Depleted uranium risk assessment for Jefferson Proving Ground using data from environmental monitoring and site characterization. Final report

    International Nuclear Information System (INIS)

    Ebinger, M.H.; Hansen, W.R.

    1996-10-01

    This report documents the third risk assessment completed for the depleted uranium (DU) munitions testing range at Jefferson Proving Ground (JPG), Indiana, for the U.S. Army Test and Evaluation command. Jefferson Proving Ground was closed in 1995 under the Base Realignment and Closure Act and the testing mission was moved to Yuma Proving Ground. As part of the closure of JPG, assessments of potential adverse health effects to humans and the ecosystem were conducted. This report integrates recent information obtained from site characterization surveys at JPG with environmental monitoring data collected from 1983 through 1994 during DU testing. Three exposure scenarios were evaluated for potential adverse effects to human health: an occasional use scenario and two farming scenarios. Human exposure was minimal from occasional use, but significant risk were predicted from the farming scenarios when contaminated groundwater was used by site occupants. The human health risk assessments do not consider the significant risk posed by accidents with unexploded ordnance. Exposures of white-tailed deer to DU were also estimated in this study, and exposure rates result in no significant increase in either toxicological or radiological risks. The results of this study indicate that remediation of the DU impact area would not substantially reduce already low risks to humans and the ecosystem, and that managed access to JPG is a reasonable model for future land use options

  9. Seismic safety margins research program. Phase I final report - Plant/site selection and data collection (Project I)

    International Nuclear Information System (INIS)

    Chuang, T.Y.

    1981-07-01

    Project I of Phase I of the Seismic Safety Margins Research Program (SSMRP) comprised two parts: the selection of a representative nuclear power plant/site for study in Phase I and the collection of data needed by the other SSMRP projects. Unit 1 of the Zion Nuclear Power Plant in Zion, Illinois, was selected for the SSMRP Phase I studies. Unit 1 of the Zion plant has been validated as a good choice for the Phase I study plant. Although no single nuclear power plant can represent all such plants equally well, selection criteria were developed to maximize the generic implications of Phase I of the SSMRP. On the basis of the selection criteria, the Zion plant and its site were found to be reasonably representative of operating and future plants with regard to its nuclear steam supply system; the type of containment structure (prestressed concrete); its electrical capacity (1100 MWe); its location (the Midwest); the peak seismic acceleration used for design (0.17g); and the properties of the underlying soil (the low-strain shear-wave velocity is 1650 ft/s in a 50- to 100-ft-thick layer of soil overlying sedimentary bedrock). (author)

  10. West Hackberry Strategic Petroleum Reserve site brine-disposal monitoring, year 1 report. Volume 1. Executive summary. Final report

    Energy Technology Data Exchange (ETDEWEB)

    DeRouen, L.R.; Hann, R.W.; Casserly, D.M.; Giammona, C.; Lascara, V.J. (eds.)

    1983-02-01

    The physical, chemical and biological attributes are described for: (1) a coastal marine environment centered about a Department of Energy Strategic Petroleum Reserve (SPR) brine disposal site located 11.4 km off the southwest coast of Louisiana; and (2) the lower Calcasieu and Sabine estuarine systems that provide leach waters for the SPR project. During the study period, the daily discharge averaged 529,000 barrels of 216 0/00 brine, representing a loading of 18,000 metric tons of salt per day. The objective of this study are: (1) characterize the environment in terms of physical, chemical and biological attributes; (2) determine if significant adverse changes in ecosystem productivity and stability of the biological community are occurring as a result of brine discharge; and (3) determine the magnitude of any change observed. This report describes the methodology and significant results of the first year's monitoring effort of the West Hackberry brine disposal site. The investigative tasks, presented as separate sections, are: Physical Oceanography, Estuarine Hydrology and Hydrography, Analysis of Discharge Plume, Water and Sediment Quality, Special Pollutant Surveys, Benthos, Nekton, Phytoplankton, Zooplankton and Data Management.

  11. Water supply and needs for West Texas

    Science.gov (United States)

    This presentation focused on the water supplies and needs of West Texas, Texas High Plains. Groundwater is the most commonly used water resources on the Texas High Plains, with withdrawals from the Ogallala Aquifer dominating. The saturation thickness of the Ogallala Aquifer in Texas is such that t...

  12. TEXAS MIGRANT LABOR, THE 1964 MIGRATION.

    Science.gov (United States)

    Good Neighbor Commission of Texas, Austin.

    THE MAJORITY OF TEXAS MIGRANTS LIVE IN SOUTH TEXAS AND APPROXIMATELY 95 PERCENT OF THEM ARE OF MEXICAN EXTRACTION. MOST OF THE OTHER FIVE PERCENT ARE EAST TEXAS NEGROES. THE MECHANIZATION OF COTTON HARVESTING AND THE EXPIRATION OF THE "BRACERO PROGRAM" IN 1964 HAVE CAUSED MORE TEXAS MIGRANTS TO SEEK EMPLOYMENT OUTSIDE OF THE STATE. DURING 1964,…

  13. Texas Affordable Baccalaureate Program: A Collaboration between the Texas Higher Education Coordinating Board, South Texas College, and Texas A&M University-Commerce. CBE Case Study

    Science.gov (United States)

    Klein-Collins, Rebecca; Glancey, Kathleen

    2015-01-01

    This case study is part of a series on newer competency-based degree programs that have been emerging in recent years. In January 2014, the Texas Higher Education Coordinating Board (THECB), South Texas College (STC), and Texas A&M University-Commerce (A&M Commerce) launched the Texas Affordable Baccalaureate Program, the state's first…

  14. Long-Term Structural Solution for the Mouth of Colorado River Navigation Channel, Texas

    National Research Council Canada - National Science Library

    Kraus, Nicholas C; Lin, Lihwa; Smith, Ernest R; Heilman, Daniel J; Thomas, Robert C

    2008-01-01

    ... in support of a reliable shallow-draft channel at the Mouth of the Colorado River (MCR), Texas. The site has experienced excessive sediment shoaling that has denied full project features to navigation channel users...

  15. Texas floods of 1940

    Science.gov (United States)

    Breeding, Seth D.

    1948-01-01

    Floods occurred in Texas during, June, July, and November 1940 that exceeded known stages on many small streams and at a few places on the larger streams. Stages at several stream-gaging stations exceeded the maximum known at those places since the collection of daily records began. A storm, haying its axis generally on a north-south line from Cameron to Victoria and extending across the Brazos, Colorado, Lavaca, and Guadalupe River Basins, caused heavy rainfall over a large part of south-central Texas. The maximum recorded rain of 22.7 inches for the 2-day period June 29-30 occurred at Engle. Of this amount, 17.5 inches fell in the 12-hour period between 8 p.m. June 29, and 8 a.m. June 30. Light rains fell at a number of places on June 28, and additional light rains fell at many places within the area from July 1 to 4. During the period June 28 to July 4 more than 20 inches of rain fell over an area of 300 square miles, more than 15 inches over 1,920 square miles, and more than 10 inches over 5,100 square miles. The average annual rainfall for the area experiencing the heaviest rainfall during this storm is about 35 inches. Farming is largely confined to the fertile flood plains in much of the area subjected to the record-breaking floods in June and July. Therefore these floods, coming at the height of the growing season, caused severe losses to crops. Much damage was done also to highways and railways. The city of Hallettsville suffered the greatest damage of any urban area. The Lavaca River at that place reached a stage 8 feet higher than ever known before, drowned several people, destroyed many homes, and submerged almost the entire business district. The maximum discharge there was 93,100 second-feet from a drainage area of 101 square miles. Dry Creek near Smithville produced a maximum discharge of 1,879 second-feet from an area of 1.48 square miles and a runoff of 11.3 inches in a 2-day period from a rainfall of 19.5 inches. The area in the Colorado River

  16. Decommissioning of eight surplus production reactors at the Hanford Site, Richland, Washington. Addendum (Final Environmental Impact Statement)

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The first section of this volume summarizes the content of the draft environmental impact statement (DEIS) and this Addendum, which together constitute the final environmental impact statement (FEIS) prepared on the decommissioning of eight surplus plutonium production reactors at Hanford. The FEIS consists of two volumes. The first volume is the DEIS as written. The second volume (this Addendum) consists of a summary; Chapter 9, which contains comments on the DEIS and provides DOE`s responses to the comments; Appendix F, which provides additional health effects information; Appendix K, which contains costs of decommissioning in 1990 dollars; Appendix L, which contains additional graphite leaching data; Appendix M, which contains a discussion of accident scenarios; Appendix N, which contains errata; and Appendix 0, which contains reproductions of the letters, transcripts, and exhibits that constitute the record for the public comment period.

  17. Nevada Test Site Area 25, Radiological Survey and Cleanup Project, 1974-1983 (a revised final report). Revision 1

    International Nuclear Information System (INIS)

    Miller, M.G.

    1984-12-01

    This report describes the radiological survey, decontamination and decommissioning (D and D) of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for beta plus gamma and alpha radioactive contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 9 references, 23 figures

  18. Discrete-event simulation of nuclear-waste transport in geologic sites subject to disruptive events. Final report

    International Nuclear Information System (INIS)

    Aggarwal, S.; Ryland, S.; Peck, R.

    1980-01-01

    This report outlines a methodology to study the effects of disruptive events on nuclear waste material in stable geologic sites. The methodology is based upon developing a discrete events model that can be simulated on the computer. This methodology allows a natural development of simulation models that use computer resources in an efficient manner. Accurate modeling in this area depends in large part upon accurate modeling of ion transport behavior in the storage media. Unfortunately, developments in this area are not at a stage where there is any consensus on proper models for such transport. Consequently, our work is directed primarily towards showing how disruptive events can be properly incorporated in such a model, rather than as a predictive tool at this stage. When and if proper geologic parameters can be determined, then it would be possible to use this as a predictive model. Assumptions and their bases are discussed, and the mathematical and computer model are described

  19. On-site meteorological instrumentation requirements to characterize diffusion from point sources: workshop report. Final report Sep 79-Sep 80

    International Nuclear Information System (INIS)

    Strimaitis, D.; Hoffnagle, G.; Bass, A.

    1981-04-01

    Results of a workshop entitled 'On-Site Meteorological Instrumentation Requirements to Characterize Diffusion from Point Sources' are summarized and reported. The workshop was sponsored by the U.S. Environmental Protection Agency in Raleigh, North Carolina, on January 15-17, 1980. Its purpose was to provide EPA with a thorough examination of the meteorological instrumentation and data collection requirements needed to characterize airborne dispersion of air contaminants from point sources and to recommend, based on an expert consensus, specific measurement technique and accuracies. Secondary purposes of the workshop were to (1) make recommendations to the National Weather Service (NWS) about collecting and archiving meteorological data that would best support air quality dispersion modeling objectives and (2) make recommendations on standardization of meteorological data reporting and quality assurance programs

  20. On-site transportation and handling of uranium-233 special nuclear material: Preliminary hazards and accident analysis. Final

    International Nuclear Information System (INIS)

    Solack, T.; West, D.; Ullman, D.; Coppock, G.; Cox, C.

    1995-01-01

    U-233 Special Nuclear Material (SNM) currently stored at the T-Building Storage Areas A and B must be transported to the SW/R Tritium Complex for repackaging. This SNM is in the form of oxide powder contained in glass jars which in turn are contained in heat sealed double polyethylene bags. These doubled-bagged glass jars have been primarily stored in structural steel casks and birdcages for approximately 20 years. The three casks, eight birdcages, and one pail/pressure vessel will be loaded onto a transport truck and moved over an eight day period. The Preliminary Hazards and Accident Analysis for the on-site transportation and handling of Uranium-233 Special Nuclear Material, documented herein, was performed in accordance with the format and content guidance of DOE-STD-3009-94, Preparation Guide for US Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports, dated July 1994, specifically Chapter Three, Hazard and Accident Analysis. The Preliminary Hazards Analysis involved detailed walkdowns of all areas of the U-233 SNM movement route, including the T-Building Storage Area A and B, T-Building truck tunnel, and the roadway route. Extensive discussions were held with operations personnel from the Nuclear Material Control Group, Nuclear Materials Accountability Group, EG and G Mound Security and the Material Handling Systems Transportation Group. Existing documentation related to the on-site transportation of hazardous materials, T-Building and SW/R Tritium Complex SARs, and emergency preparedness/response documentation were also reviewed and analyzed to identify and develop the complete spectrum of energy source hazards

  1. Effects of wood-ash addition on nitrogen turnover in a highly nitrogen loaded spruce site. Final project report

    International Nuclear Information System (INIS)

    Nohrstedt, H.Oe.; Hoegbom, Lars; Nordlund, Sten

    2000-04-01

    During two consecutive years, it was studied how a fertilization with 4.2 tonnes pelleted bark ash per ha, made six-seven years earlier, affected soil chemistry, nitrogen turnover and soil-water chemistry on a Norway spruce site in SW Sweden. The actual site has a very acidic soil. At the same time, the supply of inorganic N is rich. Measures against soil acidification, e. g. addition of ash or lime, may significantly influence the turnover of N with a subsequent risk for increased leaching. Thus, there is a potential conflict between two urgent environmental goals, i. e. to decrease acidification and to decrease the N load on aquatic ecosystems. In the humus layer and the upper 5 cm of the mineral soil, pH(H 2 O) had increased with at the most 0.2 units because of the ash addition. The easily extractable amounts of Mg, P and nitrate were slightly increased. The potential nitrification in the humus layer was generally higher in the ash treatment, but the difference. was not statistically significant. The soil water at 50 cm depth was 0.1-0.2 pH-units more acidic where ash had been applied. Simultaneously, there were tendencies for higher concentrations of nitrate, Al and K. This is the first time in Sweden that ash fertilization of a closed forest has given clear indications of an increased N leaching. As expected, the ash fertilization decreased the acidity of the top soil. On the contrary, the runoff became more acidic and more rich in Al. Thus, the ash fertilization has counteracted one of its primary goals, i. e. to produce a runoff less toxic to aquatic life. The acidification of the runoff may partially be because of acid production during nitrification

  2. Siting actions in compacts and nonmember states

    International Nuclear Information System (INIS)

    Tullis, J.

    1986-05-01

    This paper examines the status of siting actions in those compacts and states currently progressing with siting studies. The efforts of the Central Compact Commission, Texas, California, Colorado and Illinois are highlighted to illustrate progress, methodology, and problems encountered

  3. Final disposal of spent fuel in the Finnish bedrock. Scope and requirements for site-specific safety analysis; Kaeytetyn polttoaineen loppusijoitus Suomen kallioperaeaen. Paikkakohtaisen turvallisuusanalyysin edellytykset ja mahdollisuudet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The report is a summary of the research conducted in the period 1993 to 1996 into safety of spent fuel final disposal. The principal goal of the research in this period, as set in 1993, was to develop a strategy for site-specific safety analysis. At the same time efforts were to be continued to gather data and validate the technical approach for the analysis. The work aimed at having the data needed for the analysis available at the end of year 1998. A safety assessment update, TILA-96, prepared by VTT Energy, is published as a separate report. The assessment is based on the TVO-92 safety analysis, but takes into account the knowledge acquired after 1992 on safety aspects of the disposal system and the data gathered from the site investigations made by TVO and from the beginning of 1996, by Posiva. Since the site investigations are still ongoing and much of the data gathered still pending interpretation, only limited amount of new site-specific information has been available for the present assessment. (172 refs.).

  4. Is the Texas Pecan Checkoff Program Working?

    OpenAIRE

    Moore, Eli D.; Williams, Gary W.

    2008-01-01

    The Texas Pecan Board was established in 1998 to administer the Texas Pecan Checkoff Program and is financed through a one-half cent per pound assessment on grower pecan sales. The Board spends the assessment collections on a variety of advertising campaigns in an attempt to expand demand for Texas pecans, both improved and native varieties, and increase the welfare of Texas pecan growers. This study presents an evaluation of the economic effectiveness of the Texas Pecan Checkoff Program in e...

  5. Final report, Task 4: options for on-site management of Nuclear Fuel Services, Inc. high level waste

    International Nuclear Information System (INIS)

    1978-01-01

    Two on-site management options for handling the NFS high-level waste were analyzed: in-tank cement solidification and perpetual tank storage of the liquid waste. The cost of converting the 8D4 plus 8D2 waste to a cementitious solid, including mixing, grout preparation, and transfer to tank 8D1 would require $3,651,000; the cost of cooling the solidified solid for 15 years, plus the cost of filling the rest of the tank space and annulus with grout, plus the cost of minimum surveillance are $10,002,000. Modification of tank 8D2 would be required; prior to transfer of the waste, tank 8D1 would also be modified for cooling of the grout mass. Estimated costs of perpetual tank storage (replacing the existing neutralized waste tank after 10 years, then transferring contents at 50-y intervals for 1000 y, with replacement of ventilation system and auxiliaries at 30-y intervals) would require a sinking fund of $11,039,000. The acidic 8D4 waste would be transferred at 50-y intervals. The sinking fund requirements are sensitive to the difference between the interest rate and the escalation rate, and also to the time assumed from present to the first tank replacement

  6. Public Community Support and Involvement around Vandellos ITER Site (EISS-Vandellos 2002/2003). Final Report

    International Nuclear Information System (INIS)

    Sola, R.; Prades, A.; Riba, D.; Doval, E.; Munoz, J.; Garay, A.; Viladrich, C.

    2006-01-01

    The Report summarizes a year and a half research on the social perception and expectations regarding the possible sitting of ITER in Vandellos carried out in the framework of the European ITER Site Studies (EISS). The aims were to examine the needs and preferences in terms of public information and communication; to explore the risks and benefits the community links to the Centre; and to analyse the local expectations concerning public participation. A methodological strategy integrating qualitative methodologies [semi structured interviews to key informants at the local level, and to key research groups in the surrounding area, together with a focus group with local opinion leaders], and quantitative techniques [Computer Assisted Telephone Interview (CATI) applied to a sample of 400 participants] was implemented. The local community has lived with complex and high risk facilities for decades, thus local people has a strong familiarity with technological and energy production systems, but no experience with large research installations. In such a context the global opinion towards the possibility of hosting ITER was clearly favourable, and linked to a strong demand in terms of public information and participation. (Author) 45 refs

  7. Risk assessment for the Yucca Mountain high-level nuclear waste repository site: Estimation of volcanic disruption. Final report

    International Nuclear Information System (INIS)

    Ho, Chih-Hsiang.

    1992-01-01

    In this article, we model the volcanism near the proposed nuclear waste repository at Yucca Mountain, Nevada, U.S.A. by estimating the instantaneous recurrence rate using a nonhomogeneous Poisson process with Weibull intensity and by using a homogeneous Poisson process to predict future eruptions. We then quantify the probability that any single eruption is disruptive in terms of a (prior) probability distribution, since not every eruption would result in disruption of the repository. Bayesian analysis is performed to evaluate the volcanic risk. Based on the Quaternary data, a 90% confidence interval for the instantaneous recurrence rate near the Yucca Mountain site is (1.85 x 10 -6 /yr, 1.26 x 10 -5 /yr). Also, using these confidence bounds, the corresponding 90% confidence interval for the risk (probability of at least one disruptive eruption) for an isolation time of 10 4 years is (1.0 x 10 -3 , 6.7 x 10 -3 ), if it is assumed that the intensity remains constant during the projected time frame

  8. Public Community Support and Involvement around Vandellos ITER Site (EISS-Vandellos 2002/2003). Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Sola, R.; Prades, A.; Riba, D.; Doval, E.; Munoz, J.; Garay, A.; Viladrich, C.

    2006-07-01

    The Report summarizes a year and a half research on the social perception and expectations regarding the possible sitting of ITER in Vandellos carried out in the framework of the European ITER Site Studies (EISS). The aims were to examine the needs and preferences in terms of public information and communication; to explore the risks and benefits the community links to the Centre; and to analyse the local expectations concerning public participation. A methodological strategy integrating qualitative methodologies [semi structured interviews to key informants at the local level, and to key research groups in the surrounding area, together with a focus group with local opinion leaders], and quantitative techniques [Computer Assisted Telephone Interview (CATI) applied to a sample of 400 participants] was implemented. The local community has lived with complex and high risk facilities for decades, thus local people has a strong familiarity with technological and energy production systems, but no experience with large research installations. In such a context the global opinion towards the possibility of hosting ITER was clearly favourable, and linked to a strong demand in terms of public information and participation. (Author) 45 refs.

  9. Improving regulatory effectiveness in Federal/State siting actions. Need for power: determinants in the state decisionmaking processes. Final report

    International Nuclear Information System (INIS)

    Noble, J.B.; Hemphill, J.B.

    1978-03-01

    The Department of Energy's Nuclear Siting and Licensing Act of 1978 (S. 2775; H. R. 11704) proposes Federal/State coordination in need for facility decisionmaking for nuclear power stations. The present study examines the decisionmaking criteria used by forty-four States in making a determination of need for power/facility. Specific criteria are identified along with the number of States which make those criteria a primary or a secondary consideration in determining need for facility. Individual profiles of the studied States' decisionmaking criteria are provided. In addition, the study examines the different organizational and functional patterns found in the States' regulatory process to certificate power stations. The coordination or lack of coordination of the issuance of associated environmental permits required for power stations is outlined for each State. Information concerning States' rate treatment of expenses associated with the construction and operation of a power station is provided. The relationship between the need for power decisionmaking process and the ratemaking process is explored

  10. Central interstate low-level radioactive waste compact region site exclusionary screening study. Phase I. Final report

    International Nuclear Information System (INIS)

    1985-06-01

    The Low-Level Radioactive Waste Policy Act of 1980 assigns to the states the responsibility for disposal of the low-level radioactive waste generated within their boundaries. It also provides for regional compacts among states to address their needs on a broader basis and permits restriction of the use of regional disposal facilities after January 1, 1986, to generators of low-level waste within the region. Each state, either individually or as a member of a compact, must therefore consider the establishment of a low-level radioactive waste disposal facility within its borders. The states of Arkansas, Kansas, Louisiana, Nebraska, and Oklahoma adopted the Central Interstate Low-Level Waste Compact (CILLWC) and legislation was submitted to Congress for consent in June of 1983 legislation is being reintroduced in the 99th Congress. In August of 1984, the CILLWC selected and contracted Dames and Moore to conduct a Phase I-Site Suitability Screening Study for a low-level radioactive waste disposal facility in the five-state region. This report presents the results of the Phase I Screening Study. Dames and Moore reported to the Technical Advisory Committee (TAC) of the CILLWC which provided guidance and comment on work progress and direction

  11. Environmental considerations. Environmental impacts of uranium mining in South Texas

    International Nuclear Information System (INIS)

    Kallus, M.F.

    1977-01-01

    Recent investigations of uranium mining and milling activities in the Grants Mineral Belt of New Mexico revealed serious environmental problems associated with these activities. An investigation was undertaken in the South Texas Uranium Belt to determine whether or not similar or other environmental problems existed. The study describes: (1) the history of uranium mining and milling in South Texas, (2) the area economy and demography, (3) the occurrence of uranium ore and (4) the regulatory aspects of uranium mining and milling in South Texas. The commercial recovery and processing of uranium in this area is described in some detail. Exploration, open pit mining, in-situ solution mining and processing techniques for ''yellowcake'' (U 3 O 8 ), the uranium product of the area, are discussed. The state and federal regulations pertinent to uranium mining and milling are summarized. Finally, the environmental effects of these activities are discussed and conclusions and recommendations are drawn

  12. The environmental factors to be considered in the site selection studies of the spent fuel final disposal

    International Nuclear Information System (INIS)

    Aeikaes, Timo

    1985-10-01

    The ojective of the work has been to elucidate environmental factors, which could have an influence on the selection of areas. The factors were identified and their significance evaluated by going through the present plan for the final disposal of spent fuel. Population density and transport conditions were the most important factors. Protected areas, groundwater reservoirs and restrictions presented in regional land-use plans were also noted. The potential areas have been identified by the Geological Survey of Finland. First 327 large bedrock blocks were identified. The extent of the block areas was between 100-200 km 2 . The environmental factors of these areas were mapped and the areas were classified. The study was based on maps, published regional plans and inventory of groundwater reservoirs. The Geological Survey of Finland selected 162 block areas for preliminary characterization and geological classification. 61 block areas were chosen for further geological studies. By interpretation of aerial photographs and field reconnaissance trip the Geological Survey identified 134 potential investigation areas. A large block area typically contained two possible investigation areas. The extent of these areas varied between 5-10 km 2 . The environmental factors of 134 possible investigation areas were studied in detail. Due to the classification made earlier, the areas were typically sparsely populated forest areas. In the detailed study the main emphasis was but on evaluation of population density, transport and inventory of land ownership. The land-ownership is important for practical reasons. Land-owner's permission is needed for the operations in the field. Areas were classified separately according to population density, transport and land-ownership. In classification the most suitable areas were uninhabited regions with few landowners and locating close (less than 10 km) to the railroad. Only a minority of the areas fell in this category with the requirement

  13. Economics of nuclear desalination: New developments and site specific studies. Final results of a coordinated research project 2002-2006

    International Nuclear Information System (INIS)

    2007-07-01

    to enhance prospects of demonstration and eventually for the successful implementation of nuclear desalination plants in Member States. This TECDOC presents the results of techno-economic feasibility studies carried out for specific sites in the ten Member States, participating in CRP2. Some of the new developments, adopted by certain Member States, and aiming to further reduce desalted water costs, have also been discussed. These results reflect the current practices, data, and assumptions specific to each participating country for the cost evaluations of nuclear and conventional water and energy cogeneration systems and their inter-comparisons. The values of various economic parameters are therefore country specific. Results are site specific and are dependent on several factors and the economic assumptions used. However, the case studies have shown that, in general, the nuclear desalination costs can vary from 0.5 to 0.94 $/m 3 for reverse osmosis (RO), from 0.6 to 0.96 $/m3 for multi effect distillation (MED) and from 1.18 to 1.48 $/m3 for multi stage flash (MSF) plants. All nuclear options are economically attractive as compared with the gas turbine combined cycle based desalination systems - as long as gas prices remain higher than 150 $/toe (21 $/bbl). It is expected that the information provided in this report would be useful to engineers, scientists and students, as well as decision makers in the Member States and would incite them to consider or to accelerate the deployment of nuclear desalination plants in their respective countries. This publication has been prepared through the collaboration of all the participants to the CRP

  14. Technical Training seminar: Texas Instruments

    CERN Multimedia

    2006-01-01

    Monday 6 November TECHNICAL TRAINING SEMINAR 14:00 to 17:30 - Training Centre Auditorium (bldg. 593) Texas Instruments Technical Seminar Michael Scholtholt, Field Application Engineer / TEXAS INSTRUMENTS (US, D, CH) POWER - A short approach to Texas Instruments power products Voltage mode vs. current mode control Differentiating DC/DC converters by analyzing control and compensation schemes: line / load regulation, transient response, BOM, board space, ease-of-use Introduction to the SWIFT software FPGA + CPLD power solutions WIRELESS / CHIPCON Decision criteria when choosing a RF platform Introduction to Texas Instruments wireless products: standardized platforms proprietary platforms ( 2.4 GHz / sub 1 GHz) development tools Antenna design: example for 2.4 GHz questions, discussion Industrial partners: Robert Medioni, François Caloz / Spoerle Electronic, CH-1440 Montagny (VD), Switzerland Phone: +41 24 447 0137, email: RMedioni@spoerle.com, http://www.spoerle.com Language: English. Free s...

  15. Final environmental impact statement for the Nevada test site and off-site locations in the State of Nevada. Public comment and response document, Volume 3, Part A comments

    International Nuclear Information System (INIS)

    1996-08-01

    On February 2, 1996, the U.S. Department of Energy (DOE) issued the Draft Environmental Impact Statement for the Nevada Test Site and Off-Site Locations in the State of Nevada (NTS EIS) for review by the state of Nevada, Indian tribes, local governments, other federal agencies, groups and organizations, and the general public. The formal comment period lasted 90 days, ending May 3, 1996. As part of the comment process, the DOE held public hearings in St. George, Utah, and in Pahrump, Reno, and Las Vegas, Nevada. Community Workshops were held in Caliente, Tonopah, Boulder City, and North Las Vegas, Nevada, in conjunction with the University of Nevada Las Vegas to discuss the Draft NTS EIS. Volume 3 of the Final NTS EIS contains 3 chapters. Chapter 1 summarizes the major issues raised by the public. Chapter 2 contains the full text of the public comments on the Draft NTS EIS received by the DOE; it includes public hearing transcripts, written comments, and comments received via a toll-free comment open-quotes hot line.close quotes Chapter 3 contains the DOE's responses to the public comments and describes how the comments were considered in the Final NTS EIS

  16. Geotechnical Impacts of Hurricane Harvey Along the Texas, USA Coast

    Science.gov (United States)

    Smallegan, S. M.; Stark, N.; Jafari, N.; Ravichandran, N.; Shafii, I.; Bassal, P.; Figlus, J.

    2017-12-01

    As part of the NSF-funded Geotechnical Extreme Events Reconnaissance (GEER) Association response to Hurricane Harvey, a team of engineers and scientists mobilized to the coastal cities of Texas, USA from 1 to 5 September 2017. Damage to coastal and riverine structures due to erosion by storm surge, waves, and coastal and riverine flooding was assessed in a wide coastal zone between Corpus Christi and Galveston. Making initial landfall near Rockport, Texas on 26 August 2017, Hurricane Harvey was classified as a category 4 hurricane on the Saffir-Simpson scale with wind speeds exceeding 130 mph and an atmospheric pressure of 938 mbar. The storm stalled over the Houston area, pouring 40 inches of rain on an area encompassing more than 3,000 square miles. Hurricane Harvey, which remained a named storm for 117 hours after initial landfall, slowly moved east into the Gulf of Mexico and made final landfall near Cameron, Louisiana on 30 August. The GEER team surveyed sixteen main sites, extending from Mustang Island in the southwest to Galveston in the northeast and as far inland as Rosenburg. In Port Aransas, beach erosion and undercutting along a beach access road near Aransas Pass were observed. Due to several tide gauge failures in this area, the nearest NOAA tide gauge (#8775870 near Corpus Christi) was used to estimate water levels of 1.35 m, approximately 1.0 m above the predicted tide. In Holiday Beach, anchored retaining walls were inundated, causing backside scour along the entire length and exposing the sheetpile wall anchors. Along the Colorado River at the Highway 35 bridge near Bay City, active riverbank failure was observed and a sheet pile wall was found collapsed. Significant sediment deposits lined the vegetated riverbanks. A USGS stream gage recorded gage heights greater than 45 ft, exceeding the flood stage of 44 ft. Fronting a rubblemound seawall in Surfside Beach, a runnel and ridge formation was observed. Nearby at San Luis Pass, infilled scour

  17. Muleshoe Virus and Other Hantaviruses Associated with Neotomine or Sigmodontine Rodents in Texas.

    Science.gov (United States)

    Milazzo, Mary Louise; Cajimat, Maria N B; Richter, Martin H; Bradley, Robert D; Fulhorst, Charles F

    2017-10-01

    The broad objective of this study was to increase our knowledge of Muleshoe virus and other hantaviruses associated with cricetid rodents in Texas. Anti-hantavirus antibody was found in 38 (3.2%) of 1171 neotomine rodents and 6 (1.8%) of 332 sigmodontine rodents from 10 Texas counties; hantaviral RNA was detected in 23 (71.9%) of 32 antibody-positive rodents. Analyses of nucleocapsid protein gene sequences indicated Muleshoe virus infection in four hispid cotton rats (Sigmodon hispidus) from northern Texas; Bayou virus, three Texas marsh oryzomys (Oryzomys texensis) from the Gulf Coast; Limestone Canyon virus, five brush mice (Peromyscus boylii) from western Texas; and Sin Nombre virus-five Texas mice (P. attwateri), one Lacey's white-ankled deer mouse (P. laceianus), four white-footed mice (P. leucopus), and one fulvous harvest mouse (Reithrodontomys fulvescens) from northern, central, or southern Texas. The results of this study together with the results of a previous study revealed that Muleshoe virus, perhaps in association with S. hispidus, is distributed across northern Texas. Finally, the results of Bayesian analyses of glycoprotein precursor (GPC) gene sequences and pairwise comparisons of complete GPC (amino acid) sequences strengthened support for the notion that Muleshoe virus is distinct from Black Creek Canal virus, Bayou virus, and all other species included in the Bunyaviridae, genus Hantavirus.

  18. US hydropower resource assessment for Texas

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.

    1993-12-01

    The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Texas.

  19. Chagas disease risk in Texas.

    Science.gov (United States)

    Sarkar, Sahotra; Strutz, Stavana E; Frank, David M; Rivaldi, Chissa-Louise; Sissel, Blake; Sánchez-Cordero, Victor

    2010-10-05

    Chagas disease, caused by Trypanosoma cruzi, remains a serious public health concern in many areas of Latin America, including México. It is also endemic in Texas with an autochthonous canine cycle, abundant vectors (Triatoma species) in many counties, and established domestic and peridomestic cycles which make competent reservoirs available throughout the state. Yet, Chagas disease is not reportable in Texas, blood donor screening is not mandatory, and the serological profiles of human and canine populations remain unknown. The purpose of this analysis was to provide a formal risk assessment, including risk maps, which recommends the removal of these lacunae. The spatial relative risk of the establishment of autochthonous Chagas disease cycles in Texas was assessed using a five-stage analysis. 1. Ecological risk for Chagas disease was established at a fine spatial resolution using a maximum entropy algorithm that takes as input occurrence points of vectors and environmental layers. The analysis was restricted to triatomine vector species for which new data were generated through field collection and through collation of post-1960 museum records in both México and the United States with sufficiently low georeferenced error to be admissible given the spatial resolution of the analysis (1 arc-minute). The new data extended the distribution of vector species to 10 new Texas counties. The models predicted that Triatoma gerstaeckeri has a large region of contiguous suitable habitat in the southern United States and México, T. lecticularia has a diffuse suitable habitat distribution along both coasts of the same region, and T. sanguisuga has a disjoint suitable habitat distribution along the coasts of the United States. The ecological risk is highest in south Texas. 2. Incidence-based relative risk was computed at the county level using the Bayesian Besag-York-Mollié model and post-1960 T. cruzi incidence data. This risk is concentrated in south Texas. 3. The

  20. Chagas disease risk in Texas.

    Directory of Open Access Journals (Sweden)

    Sahotra Sarkar

    Full Text Available BACKGROUND: Chagas disease, caused by Trypanosoma cruzi, remains a serious public health concern in many areas of Latin America, including México. It is also endemic in Texas with an autochthonous canine cycle, abundant vectors (Triatoma species in many counties, and established domestic and peridomestic cycles which make competent reservoirs available throughout the state. Yet, Chagas disease is not reportable in Texas, blood donor screening is not mandatory, and the serological profiles of human and canine populations remain unknown. The purpose of this analysis was to provide a formal risk assessment, including risk maps, which recommends the removal of these lacunae. METHODS AND FINDINGS: The spatial relative risk of the establishment of autochthonous Chagas disease cycles in Texas was assessed using a five-stage analysis. 1. Ecological risk for Chagas disease was established at a fine spatial resolution using a maximum entropy algorithm that takes as input occurrence points of vectors and environmental layers. The analysis was restricted to triatomine vector species for which new data were generated through field collection and through collation of post-1960 museum records in both México and the United States with sufficiently low georeferenced error to be admissible given the spatial resolution of the analysis (1 arc-minute. The new data extended the distribution of vector species to 10 new Texas counties. The models predicted that Triatoma gerstaeckeri has a large region of contiguous suitable habitat in the southern United States and México, T. lecticularia has a diffuse suitable habitat distribution along both coasts of the same region, and T. sanguisuga has a disjoint suitable habitat distribution along the coasts of the United States. The ecological risk is highest in south Texas. 2. Incidence-based relative risk was computed at the county level using the Bayesian Besag-York-Mollié model and post-1960 T. cruzi incidence data. This