  1. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    International Nuclear Information System (INIS)

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete

  2. Status of the Texas low-level radioactive waste disposal site - construction sequencing and staffing patterns

    International Nuclear Information System (INIS)

    Jacobi, L.R. Jr.

    1996-01-01

    The Texas Low-Level Radioactive Waste Disposal Authority, an agency of the State of Texas, has been attempting to develop a site for the disposal of low-level radioactive waste in Texas for more than fourteen years. Since 1991, the agency has been evaluating a site near Sierra Blanca, in far west Texas. Site characterization was completed in 1992, and a license application was filed that year. Construction plans were completed in 1993. In April 1996, the licensing agency, the Texas Natural Resource Conservation Commission, completed its review and proposed to issue a license. The administrative hearings on the proposed license should be completed by July 1997. The Authority is prepared to begin construction and operations as soon as a final license can be issued

  3. Radiological surveillance of Remedial Action activities at the processing site, Falls City, Texas. Final report

    International Nuclear Information System (INIS)

    1993-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project's Technical Assistance Contractor (TAC) performed a radiological surveillance of the Remedial Action Contractor (RAC), MK-Ferguson and CWM Federal Environmental Services, Inc., at the processing site in Falls City, Texas. This surveillance was conducted March 22--26, 1993. No findings were identified during the surveillance. Three site-specific observations and three programmatic observations are presented in this report. The overall conclusion from the surveillance is that the radiological aspects of the Falls City, Texas, remedial action program are performed adequately. However, some of the observations identify that there is potential for improving certain aspects of the occupational radiological air sampling, ensuring analytical data quality, and in communicating with the DOE and TAC on the ore sampling methods. The TAC has also received and is currently reviewing the RAC's responses regarding the observations identified during the radiological surveillance performed October 29--30, 1992

  4. Public Outreach of the South Texas Health Physic Society and Texas A and M University Nuclear Engineering Department

    International Nuclear Information System (INIS)

    Berry, R. O.

    2003-01-01

    In a cooperative effort of the members of the South Texas Chapter of the Heath Physics Society (STC-HPS) and the Texas A and M University Nuclear Engineering Department, great efforts have been made to reach out and provide educational opportunities to members of the general public, school age children, and specifically teachers. These efforts have taken the form of Science Teacher Workshops (STW), visits to schools all over the state of Texas, public forums, and many other educational arenas. A major motivational factor for these most recent efforts can be directly tied to the attempt of the State of Texas to site a low-level radioactive waste facility near Sierra Blanca in West Texas. When the State of Texas first proposed to site a low level radioactive waste site after the Low-Level Radioactive Waste Policy Act of 1980 was passed, many years of political struggle ensued. Finally, a site at Sierra Blanca in far West Texas was selected for study and characterization for a disposal site for waste generated in the Texas Compact states of Maine, Vermont and Texas. During this process, the outreach to and education of the local public became a paramount issue

  5. Site specific statutory compliance planning for the salt repository project at the Deaf Smith County Site, Texas: Requirements, strategy, and status: Revision 4

    International Nuclear Information System (INIS)

    1986-06-01

    This document and the requirements and actions it presents are addressed to the Deaf Smith County Site, Texas. The proposed actions upon which the plan is based are those described in Chapters 4 and 5 of the final EA for the site. Similarly, the environmental and health and safety requirements covered in the plan are those identified in the EA as being potentially applicable to the salt repository project at the Deaf Smith site. 12 figs., 8 tabs

  6. Wildlife Contact Rates at Artificial Feeding Sites in Texas

    Science.gov (United States)

    Campbell, Tyler A.; Long, David B.; Shriner, Susan A.

    2013-06-01

    Given the popularity of feeding white-tailed deer ( Odocoileus virginianus) in Texas and the increasing amount of corn that is distributed, more information is needed on the impacts of this activity on non-target wildlife. Our objectives were to report visitation, intra- and interspecific contact, and contact rates of wildlife at artificial feeding sites in Texas. Our study was conducted at three sites in Kleberg and Nueces counties, Texas. We trapped animals from February to April and August to September, 2009 and marked animals with passive integrated transponder (PIT) tags. At each site and season, we placed one feeder system containing a PIT tag reader within 600 m of trap locations. Readers detected PIT tags from a distance of 25 cm. We determined a contact event to occur when two different PIT tags were detected by feeder systems within 5 s. We recorded 62,719 passes by raccoons ( Procyon lotor), 103,512 passes by collared peccaries ( Pecari tajacu), 2,923 passes by feral swine ( Sus scrofa), 1,336 passes by fox squirrels ( Sciurus niger), and no passes by opossums ( Didelphis virginiana) at feeder systems. For site-season combinations in which contact events occurred, we found intraspecific contact rates (contacts per day) for raccoons, collared peccaries, and feral swine to be 0.81-124.77, 0.69-38.08, and 0.0-0.66, respectively. Throughout our study we distributed ~2,625 kg of whole kernel corn, which resulted in 6,351 contact events between marked wildlife (2.4 contacts per kg of corn). If 136 million kg of corn is distributed in Texas annually, we would expect >5.2 billion unnatural contact events between wildlife would result from this activity each year in Texas. Consequently, we do not believe that it is wise for natural resource managers to maintain artificial feeding sites for white-tailed deer or other wildlife due to pathogen transmission risks.

  7. Development of a low level radioactive waste disposal site in Texas - 1994 status

    International Nuclear Information System (INIS)

    Jacobi, L.R. Jr.

    1995-01-01

    The Texas Low Level Radioactive Waste Disposal Authority, an agency of the State of Texas, has been trying to develop a site for the disposal of low level radioactive waste in Texas for over ten years. Since 1991, the agency has been evaluating a site near Sierra Blanca, in far west Texas. Site characterization has been completed and a license application has been filed with the Texas Natural Resource Conservation Commission. Construction plans were completed in 1993, and the agency is prepared to begin construction and operations as soon as a license can be issued. Development costs for the site are borne by the utility companies and other major generators in Texas through the assessment of a planning and implementation fee. Total costs to date are approximately $26 million. As the project moves toward completion, state and national anti-nuclear activist groups have become more involved in attempts to thwart the Texas government's effort to solve the radioactive waste problem. To counter this increased opposition, the Texas utility companies and medical radioactive waste generators have also become more active in responding to these groups. This has been very helpful and is in keeping with the elements of building block 12 of the Nuclear Power Oversight Committee's Strategic Plan for Building New Nuclear Power Plants. This paper and poster session look at the schedule, design, and long term prospects for ultimate success of the project

  8. Site study plan for Transportation, Deaf Smith County Site, Texas: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    This site study plan describes transportation field studies to be conducted during the characterization of the Deaf Smith County, Texas, site for the US Department of Energy's Salt Repository Project. The studies are needed to identify and assess potential project impacts to transportation infrastructure and systems in the project vicinity and along potential transportation routes to the site across the State of Texas. The studies are also needed to locate and design project transportation facilities, and to evaluate and design impact mitigation. After identifying the transportation information requirements needed to comply with Federal, State, and local regulations and repository program requirements, the site study plan describes the study design and rationale, the field data collection procedures and equipment, the data analysis methods and application of results, the data management strategy, the schedule of field activities, the management of the study, and the study's quality assurance program. The field data collection activities are organized into programs for the characterization of site vicinity rail corridors and highway corridors, characterization of alternative statewide transportation routes, monitoring of site characterization effects on transportation, characterization of aircraft overflight patterns and hazardous material transportation patterns, and assessment of emergency response preparedness along alternative statewide transportation routes. 34 refs., 10 figs., 2 tabs

  9. Description of floodplains and wetlands, Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    1986-11-01

    Floodplains and wetlands are important features of the Texas Panhandle landscape, and are found on the Deaf Smith County site and in its vicinity. Use or disturbance of floodplains and wetlands in relation to the Civilian Radioactive Waste Management Program is subject to environmental review requirements implementing two Executive Orders. This report provides general information on playa wetlands in the Texas Panhandle, and describes and maps floodplains and wetlands on the Deaf Smith site and in its vicinity. The report is based on the published literature, with information from limited field reconnaissance included

  10. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas

    International Nuclear Information System (INIS)

    Chernoff, A.R.; Lacker, D.K.

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas

  11. Environmental assessment: Deaf Smith County site, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of the nine potentially acceptable sites for mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines.

  12. Environmental assessment: Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of the nine potentially acceptable sites for mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines

  13. Texas situation

    International Nuclear Information System (INIS)

    Avant, R.V. Jr.; Bowmer, W.J.

    1986-01-01

    The Texas Low-Level Radioactive Waste Disposal Authority was formed in 1981 to address the Texas low-level radioactive waste problem consistent with the direction of P.L. 96-573. The Authority has completed technical tasks, including source term evaluations, preliminary conceptual designs, economic assessments, and long-range planning, and has work in progress on facility design, site selection, operating procedures, and licensing. Site selection has been the major technical activity and will be completed in 1987 after on-site evaluations of potential sites. The Authority expects to have its site licensed and operating in 1992. Texas has been the leader in site selection. Political concerns and the uncertainty of the national agenda led Texas policy makers to slow down the state's progress. The lessons learned through the Texas situation should be instructive to other states and compacts and may well be a prediction of events for these other groups. This paper discusses the background and status of Texas development activities, future plans, and lessons learned

  14. Environmental assessment: Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and the eight other potentially sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines. On the basis of these findings, the DOE is nominating the Deaf Smith County site as one of the five sites suitable for characterization. 591 refs., 147 figs., 173 tabs

  15. Environmental assessment: Deaf Smith County site, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and the eight other potentially sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines. On the basis of these findings, the DOE is nominating the Deaf Smith County site as one of the five sites suitable for characterization. 591 refs., 147 figs., 173 tabs.

  16. Technical procedures for utilities and solid waste: Environmental Field Program, Deaf Smith County site, Texas: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    The evaluation of environmental issues and concerns and the addressing of statutory requirements are fundamental parts in the characterization of the site in Deaf Smith County, Texas for the US Department of Energy's Salt Repository Project (SRP). To ensure that the environmental field program comprehensively addresses the issues and requirements of the project, a site study plan (SSP) has been prepared for Utilities and Solid Waste considerations. This technical procedure (TP) has been developed to implement the field program described in the Utilities and Solid Waste Site Study Plan. The purpose and scope of the Utilities and Solid Waste Technical Procedure is to develop and implement a data collection procedure to fulfill the data base needs of the Utilities and Solid Waste SSP. The procedure describes a method of obtaining, assessing and verifying the capabilities of the regional service utilities and disposal contractors. This data base can be used to identify a preferred service source for the engineering contractor. The technical procedure was produced under the guidelines established in Technical Administrative Procedure No. 1.0, Preparation, Review and Approval of Technical Procedures

  17. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report, attachment 2, geology report; attachment 3, groundwater hydrology report; and attachment 4, water resources protection strategy. Final report

    International Nuclear Information System (INIS)

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the U.S. Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas

  18. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report, attachment 2, geology report; attachment 3, groundwater hydrology report; and attachment 4, water resources protection strategy. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the U.S. Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  19. Environmental assessment overview, Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines. On the basis of these findings, the DOE is nominating the Deaf Smith County site as one of five sites suitable for characterization. 3 figs

  20. Health assessment for Tex Tin Corporation, National Priorities List Site, Texas City, Texas, Region 6. CERCLIS No. TXD062113329. Preliminary report

    International Nuclear Information System (INIS)

    1990-01-01

    The Tex Tin Corporation facility, formerly Gulf Chemical and Metallurgical Corporation, is a proposed National Priorities List site located in Texas City, Galveston County, Texas. Tex Tin previously operated as a primary tin smelter, but currently operates as a copper smelter. Significant concentrations of metals (antimony, arsenic, barium, cadmium, chromium, copper, lead, manganese, mercury, nickel, silver, tin, and zinc) have been detected on-site in surface water, groundwater, and soil. Significant concentrations of metals (arsenic, cadmium, chromium, lead, nickel, and tin) have also been detected in ambient air samples collected off-site. Some remediation activities have occurred on-site including the closure of a 19-million-gallon ferric chloride pond and the removal of approximately 4,000 drums containing radioactive material. The Tex Tin site poses a potential public health concern for on-site workers, residents living in nearby neighborhoods, and possibly for a limited number of residents on private wells located within approximately one mile of the site

  1. Consultation draft: Site characterization plan overview, Deaf Smith County Site, Texas: Nuclear Waste Policy Act (Section 113)

    International Nuclear Information System (INIS)

    1988-01-01

    The Department of Energy (DOE) is preparing a site characterization plan for the candidate site in Deaf Smith County, Texas. The DOE has provided, for information and review, a consultation draft of the plan to the State of Texas and the US Nuclear Regulatory Commission. The site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site characterization plan; it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the repository system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Deaf Smith County site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 15 figs., 1 tab

  2. Estimated transportation routes to a candidate salt repository site in Deaf Smith County, Texas

    International Nuclear Information System (INIS)

    Joy, D.S.; Johnson, P.E.

    1987-10-01

    This report presents a preliminary analysis of possible highway and rail transportation routes within Texas, Oklahoma, and New Mexico for shipments of spent fuel to the candidate repository site in Deaf Smith County, Texas. Two cases are examined for highway shipments. The initial case analyzes shipments following the Department of Transportation's HM-164 regulations for shipment of spent fuel. The second case analyzes normal commercial routes. Three rail cases are also examined. Each case analyzes potential routes that would be used based for different access spurs into the repository site. Two appendices are included which examine additional scenarios generated by restricting routes from passing through various metropolitan areas. The major finding is that most shipments to the Deaf Smith site will pass through Amarillo, Texas. There are few, if any, feasible alternative routes which would significantly reduce the amount of traffic passing through Amarillo

  3. Site-specific design of the super collider in Texas

    International Nuclear Information System (INIS)

    Laughton, C.; Nelson, P.P.; Lundin, T.K.

    1990-01-01

    This paper outlines the scope of the Superconducting Super Collider (SSC) in Texas, underground works and present the current accelerator layout. After a brief overview of the site geotechnical characteristics, emphasis will be placed upon the possibilities for the incorporation of mechanical excavation technology into the construction of the various underground structures

  4. Utilities availability report for seven candidate salt sites: Final draft

    International Nuclear Information System (INIS)

    1984-12-01

    Stearns Catalytic Corporation (SC) conducted a study of availability and accessibility of electric power and natural gas supplies for each of the seven candidate sites in salt for a nuclear waste repository. The objective of this study is to indicate the existing or potential availability of adequate electric power and natural gas supplies, together with representative routing of reasonable access corridors for utility lines, for the candidate sites at Richton and Cypress Creek Domes in Mississippi, Vacherie Dome in Louisiana, Swisher and Deaf Smith Counties in Texas, and Davis and Lavender Canyons in Utah. The report describes the major characteristics of each supply and the representative routes by which each supply could be connected to the assumed respective repository site. Included are a brief narrative, maps showing representative utilities access routes, and a summary tabulation of relevant data. The supply routes used in this study are not necessarily the recommended, preferred, or selected routes. No decision affecting the final location of the preferred route has been made, therefore the routes used in this study are not to be construed as an implied decision. The routes and supply sources used in this study are for comparative purposes only, as no final selections will be made prior to site characterization

  5. Draft environmental assessment: Swisher County site, Texas. Nuclear Waste Policy Act (Section 112)

    International Nuclear Information System (INIS)

    1984-12-01

    In February 1983, the US Department of Energy (DOE) identified a location in Swisher County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. The potentially acceptable site was subsequently narrowed to an area of 9 square miles. To determine their suitability, the Swisher site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. These evaluations are reported in this draft environmental assessment (EA), which is being issued for public review and comment. The DOE findings and determinations that are based on these evaluations are preliminary and subject to public review and comment. A final EA will be prepared after considering the comments received. On the basis of the evaluations contained in this draft EA, the DOE has found that the Swisher site is not disqualified under the guidelines. The site is contained in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site - the Deaf Smith site. Although the Swisher site appears to be suitable for site characterization, the DOE has concluded that the Deaf Smith site is the preferred site in the Permian Basin and is proposing to nominate the Deaf Smith site rather than the Swisher site as one of the five sites suitable for characterization

  6. Texas A&M University in the JET Collaboration - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Fries, Rainer [Texas A & M Univ., College Station, TX (United States); Ko, Che-Ming [Texas A & M Univ., College Station, TX (United States)

    2016-05-02

    This final report summarizes the work done by PIs at Texas A&M University within the JET Topical Collaboration. The main focus of the group at Texas A&M has been the development and implementation of a hadronization model suitable to calculate hadronization of jet showers in heavy ion collisions event by event. The group successfully developed a hybrid model of parton recombination and remnant string fragmentation including recombination with thermal partons. A code realizing this model was developed and shared with other JET members. In addition, the group at Texas A&M worked on both open and hidden heavy flavor probes. In particular, they developed a description of heavy flavor hadronization based on recombination, and consistent with in-medium scattering rates of heavy quarks, and suggested the Ds meson as a precise probe of the hadronization mechanism. Another noteworthy focus of their work was electromagnetic probes, in particular, dileptons and photons from interactions of jets with the medium. In the soft sector the group has made several contributions to modern topics, e.g. the splitting of elliptic flow between isospin partners and the role of the initial strong gluon fields.

  7. Texas A&M University in the JET Collaboration - Final Report

    International Nuclear Information System (INIS)

    Fries, Rainer; Ko, Che-Ming

    2016-01-01

    This final report summarizes the work done by PIs at Texas A&M University within the JET Topical Collaboration. The main focus of the group at Texas A&M has been the development and implementation of a hadronization model suitable to calculate hadronization of jet showers in heavy ion collisions event by event. The group successfully developed a hybrid model of parton recombination and remnant string fragmentation including recombination with thermal partons. A code realizing this model was developed and shared with other JET members. In addition, the group at Texas A&M worked on both open and hidden heavy flavor probes. In particular, they developed a description of heavy flavor hadronization based on recombination, and consistent with in-medium scattering rates of heavy quarks, and suggested the D s meson as a precise probe of the hadronization mechanism. Another noteworthy focus of their work was electromagnetic probes, in particular, dileptons and photons from interactions of jets with the medium. In the soft sector the group has made several contributions to modern topics, e.g. the splitting of elliptic flow between isospin partners and the role of the initial strong gluon fields.

  8. Texas Hydrogen Education Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hitchcock, David; Bullock, Dan

    2011-06-30

    The Texas Hydrogen Education project builds on past interest in hydrogen and fuel cells to help create better informed leaders and stakeholders and thereby improve decision making and planning for inclusion of hydrogen and fuel cell technologies as energy alternatives in Texas. In past years in Texas, there was considerable interest and activities about hydrogen and fuel cells (2000-­2004). During that time, the Houston Advanced Research Center (HARC) created a fuel cell consortium and a fuel cell testing lab. Prior to 2008, interest and activities had declined substantially. In 2008, in cooperation with the Texas H2 Coalition and the State Energy Conservation Office, HARC conducted a planning process to create the Texas Hydrogen Roadmap. It was apparent from analysis conducted during the course of this process that while Texas has hydrogen and fuel cell advantages, there was little program and project activity as compared with other key states. Outreach and education through the provision of informational materials and organizing meetings was seen as an effective way of reaching decision makers in Texas. Previous hydrogen projects in Texas had identified the five major urban regions for program and project development. This geographic targeting approach was adopted for this project. The project successfully conducted the five proposed workshops in four of the target metropolitan areas: San Antonio, Houston, Austin, and the Dallas-­Ft. Worth area. In addition, eight outreach events were included to further inform state and local government leaders on the basics of hydrogen and fuel cell technologies. The project achieved its primary objectives of developing communication with target audiences and assembling credible and consistent outreach and education materials. The major lessons learned include: (1) DOE’s Clean Cities programs are a key conduit to target transportation audiences, (2) real-­world fuel cell applications (fuel cell buses, fuel cell fork lifts

  9. Environmental regulatory compliance plan, Deaf County site, Texas: Draft revision 1

    International Nuclear Information System (INIS)

    1987-01-01

    The DOE is committed to conduct its operation in an environmentally safe and sound manner and comply with the letter and spirit of applicable environmental statues and regulations. These objectives are codified in DOE order N 5400.2, ''Environmental Policy Statement.'' This document, the Deaf Smith County site (Texas) Environmental Regulatory Compliance Plam (ERCP), is one means of implementing that policy. The ERCP describes the environmental regulatory requirements applicable to the Deaf Smith County site (Texas), and presented the framework within which the Salt Repository Project Office (SRPO) will comply with the requirements. The plan also discusses how DOE will address State and local environmental requirements. To achieve this purpose the ERCP will be developed in phases. This version of the ERCP is the first phase in the delopment of the ERCP. It represents the Salt Repository Project Office's understanding of environmental requirements for the site characterization phase of repository development. After consultation with the appropriate federal and state agencies and affected Indian tribes, the ERCP will be updated to reflect the results of consultation with these agencies and affected Indian tribes. 6 refs., 38 figs

  10. 75 FR 45695 - Final Federal Agency Actions on Trans-Texas Corridor 35 (TTC-35) in Texas

    Science.gov (United States)

    2010-08-03

    ...-Texas Corridor 35 (TTC-35) in Texas AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... proposed transportation project, TTC-35, extending from the Texas- Oklahoma line to the City of Laredo, generally paralleling existing I- 35 in the State of Texas. DATES: By this notice, the FHWA is advising the...

  11. Permian Basin, Texas: Volume 1, Text: Final preliminary design report

    International Nuclear Information System (INIS)

    1988-01-01

    This report is a description of the preliminary design for an Exploratory Shaft Facility (ESF) at the proposed 49 acre site located 21 miles north of Hereford, Texas in Deaf Smith County. Department of Energy must conduct in situ testing at depth to ascertain the engineering and environmental suitability of the site for further consideration for nuclear waste repository development. The ESF includes the construction of two 12-ft diameter engineered shafts for accessing the bedded salt horizon to conduct in situ tests to ascertain if the site should be considered a candidate site for the first High Level Nuclear Waste Repository. This report includes pertinent engineering drawings for two shafts and all support facilities necessary for shaft construction and testing program operation. Shafts will be constructed by conventional drill-and-blast methods employing ground freezing prior to shaft construction to stabilize the existing groundwater and soil conditions at the site. A watertight liner and seal system will be employed to prevent intermingling of aquifers and provide a stable shaft throughout its design life. 38 refs., 37 figs., 14 tabs

  12. Lineaments of Texas - possible surface expressions of deep-seated phenomena. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Woodruff, C.M. Jr.; Caran, S.C.

    1984-04-01

    Lineaments were identified on 51 Landsat images covering Texas and parts of adjacent states in Mexico and the United States. A method of identifying lineaments was designed so that the findings would be consistent, uncomplicated, objective, and reproducible. Lineaments denoted on the Landsat images were traced onto 1:250,000-scale work maps and then rendered cartographically on maps representing each of the 51 Landsat images at a scale of 1:500,000. At this stage more than 31,000 lineaments were identified. It included significant areas outside of Texas. In preparing the final lineament map of Texas at 1:1,000,000-scale from the 1:500,000-scale maps, all features that lay outside Texas and repetition among features perceived by individual workers were eliminated. Cultural features were checked for before reducing and cartographically fitting the mosaic of 51 individual map sheets to a single map base. Lineaments that were partly colinear but with different end points were modified into a single lineament trace with the combined length of the two or more colinear lineaments. Each lineament was checked to determine its validity according to our definition. The features were edited again to eliminate processing artifacts within the image itself, as well as representations of cultural features (fencelines, roads, and the like) and geomorphic patterns unrelated to bedrock structure. Thus the more than 31,000 lineaments originally perceived were reduced to the approximately 15,000 presented on the 1:1,000,000 map. Interpretations of the lineaments are presented.

  13. Lessons from past experiences: Texas

    International Nuclear Information System (INIS)

    Blackburn, T.W. III

    1986-01-01

    A site selection study was conducted in which technical criteria were developed and potential sites numerically ranked. Three candidate sites were chosen, two in south Texas and one in west Texas. Adamant public opposition to the two sites forced a reevaluation and redirection of the siting process. Three sites on state owned lands in west Texas have been identified under the second site selection study. The following are recommended guidelines to incorporate in any public participation program: use multiple approaches at both the regional and local level; identify the public and their true concerns; approach the public at their level and their style; use a slow, deliberate process, siting cannot be forced; be honest and available; give the public an active part in the decision making process; keep elected officials informed and active and encourage information exchange; and be prepared for surprises. Two ranking exercises were also undertaken and are briefly described. The first ranked eleven major issues in order of perceived importance. The second ranked waste disposal technologies. Detailed information on both ranking exercises can be obtained from the Texas Low-Level Radioactive Waste Disposal Authority

  14. Site Study Plan for laboratory soil mechanics, Deaf Smith County site, Texas: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    This Site Study Plan for laboratory soil mechanics describes the laboratory testing to be conducted on soil samples collected as part of the characterization of the Deaf Smith County site, Texas. This study provides for measurements of index, mechanical, thermal, hydrologic, chemical, and mineral properties of soils from boring throughout the site. Samples will be taken from Playa Borings/Trenching, Transportation/Utilities Foundation Borings, Repository Surface Facilities Design Foundation Borings, and Exploratory Shaft Facilities Design Foundation Borings. Data from the laboratory tests will be used for soil strata characterization, design of foundations for surface structures, design of transportation facilities and utility structures, design of impoundments, design of shaft lining, design of the shaft freeze wall, shaft permitting, performance assessment calculations, and other program requirements. A tentative testing schedule and milestone log are given. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 18 refs., 6 figs., 3 tabs

  15. Draft environmental assessment: Deaf Smith County site, Texas. Nuclear Waste Policy Act (Section 112)

    International Nuclear Information System (INIS)

    1984-12-01

    In February 1983, the US Department of Energy identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. The potentially acceptable site was subsequently narrowed to an area of 9 square miles. To determine their suitability, the Deaf Smith site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. These evaluations are reported in this draft environmental assessment, which is being issued for public review and comment. The DOE findings and determinations that are based on these evaluations are preliminary and subject to public review and comment. A final EA will be prepared after considering the comments received. On the basis of the evaluations reported in this draft EA, the DOE has found that the Deaf Smith site is not disqualified under the guidelines. The site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site - the Swisher site. Although the Swisher site appears to be suitable for site characterization, DOE has concluded that the Deaf Smith site is the preferred site. The DOE finds that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is proposing to nominate the Deaf Smith site as one of five sites suitable for characterization. Having compared the Deaf Smith site with the other four sites proposed for nomination, the DOE has determined that the Deaf Smith site is one of the three preferred sites for recommendation to the President as candidates for characterization

  16. Strategic petroleum reserve, Byran Mound Salt Dome, Brazoria County, Texas. Final environmental impact statement (final supplement to FEA FES 76/77-6)

    Energy Technology Data Exchange (ETDEWEB)

    1977-12-01

    On January 7, 1977, the Federal Energy Administration issued a Final Environmental Impact Statement (EIS) for the development of the Bryan Mound salt dome as a storage site for the Strategic Petroleum Reserve (FES 76/77-6). On October 1, 1977, the U.S. Department of Energy was created and the programs of the Federal Energy Administration were transferred to the new Department. As such, this final supplement is being issued by the Department of Energy. The salt dome is located in Brazoria County, Texas. Since the EIS was published, it has been determined that this arrangement would be inadequate to meet the long term requirements for filling and withdrawing oil at the site, although the disposal of brine to Dow Chemical would be utilized to the maximum extent possible. Therefore, on July 15, 1977, a Draft Supplement to FES 76/77-6 was issued addressing the environmental impacts of construction and operation of two types of brine disposal systems and a new water supply system. This final supplement addresses a brine injection well system and a water intake system. Construction of this new system component would cause temporary disruption to land use, water quality, air quality, and terrestrial and aquatic ecology. The new facilities would permanently change 17 acres of land from its present use. Operation of the systems would have relatively small, short-term impacts. Use of the brine surge pit could adversely affect air quality by emitting hydrocarbon vapors (maximum rate of 51.4 tons per year). Operation of the disposal wells would increase the salinity of an already saline aquifer. All operational impacts would be relatively minor and short-term, occurring only during periods of fill or withdrawal of the storage facility.

  17. Site study plan for routine laboratory rock mechanics, Deaf Smith County Site, Texas: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    This Site Study Plan for Routine Laboratory Rock Mechanics describes routine laboratory testing to be conducted on rock samples collected as part of the characterization of the Deaf Smith County site, Texas. This study plan describes the early laboratory testing. Additional testing may be required and the type and scope of testing will be dependent upon the results of the early testing. This study provides for measurements of index, hydrological, mechanical, and chemical properties with tests which are standardized and used widely in geotechnical investigations. Another Site Study Plan for Nonroutine Laboratory Rock Mechanics describes laboratory testing of samples from the site to determine mechanical, thermomechanical, and thermal properties by less widely used methods, many of which have been developed specifically for characterization of the site. Data from laboratory tests will be used for characterization of rock strata, design of shafts and underground facilities, and modeling of repository behavior in support of resolution of both preclosure and postclosure issues. A tentative testing schedule and milestone log are given. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 18 refs., 8 figs., 3 tabs

  18. Maternal Mortality in Texas.

    Science.gov (United States)

    Baeva, Sonia; Archer, Natalie P; Ruggiero, Karen; Hall, Manda; Stagg, Julie; Interis, Evelyn Coronado; Vega, Rachelle; Delgado, Evelyn; Hellerstedt, John; Hankins, Gary; Hollier, Lisa M

    2017-05-01

    A commentary on maternal mortality in Texas is provided in response to a 2016 article in Obstetrics & Gynecology by MacDorman et al. While the Texas Department of State Health Services and the Texas Maternal Mortality and Morbidity Task Force agree that maternal mortality increased sharply from 2010 to 2011, the percentage change or the magnitude of the increase in the maternal mortality rate in Texas differs depending on the statistical methods used to compute and display it. Methodologic challenges in identifying maternal death are also discussed, as well as risk factors and causes of maternal death in Texas. Finally, several state efforts currently underway to address maternal mortality in Texas are described. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  19. Final environmental statement related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1986-08-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of the South Texas Project, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation. Land use and terrestrial and aquatic ecological impacts will be small. No operational impacts to historic and archeological sites are anticipated. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project are anticipated to be minimal. The action called for is the issuance of an operating license for South Texas Project, Units 1 and 2

  20. Data Validation Package: April 2016 Groundwater Sampling at the Falls City, Texas, Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    Jasso, Tashina [USDOE Office of Legacy Management, Washington, DC (United States); Widdop, Michael [Navarro Research and Engineering, Inc., Las Vegas, NV (United States)

    2016-09-29

    Nine groundwater samples were collected at the Falls City, Texas, Disposal Site as specified in the March 2008 Long-Term Surveillance Plan for the US Department of Energy Falls City Uranium Mill Tailings Disposal Site, Falls City, Texas (DOE-LM/1602-2008). Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). The wells sampled included the cell performance monitoring wells (0709, 0858, 0880, 0906, and 0921) and the groundwater monitoring wells (0862, 0886, 0891, 0924, and 0963). A duplicate sample was collected from location 0891. Water levels were measured at each sampled well. Historically, cell performance monitoring wells 0908 and 0916 have not produced water and were confirmed as dry during this sampling event. These wells are completed above the saturated interval in the formation. Notable observations for time-concentration graphs in this report include: (1) uranium concentrations in well 0891 continue to increase; (2) the uranium concentration in well 0880 is higher than the 2015 value and lower than the 2014 value, and it remains within the range of historical values; and (3) uranium concentrations in the other sampled wells are below 2 mg/L and consistent with previous results.

  1. Site study plan for borehole search and characterization, Deaf Smith County Site, Texas: Revision 1

    International Nuclear Information System (INIS)

    1987-01-01

    This site study plan describes the Borehole Search and Characterization field activities to be conducted during the early stages of Site Characterization at the Deaf Smith County site, Texas. The field program has been designed to provide data useful in addressing information/data needs resulting from Federal/State/Local regulatory requirements and repository program requirements. Air and ground surveys, an extensive literature search, and landowner interviews will be conducted to locate wells within and adjacent to the proposed nuclear waste repository site in Deaf Smith County. Initially, the study will center around the planned Exploratory Shaft Facilities location and will expand outward from that location. Findings from this study may lead to preparation of a new site study plan to search suspected borehole locations, and excavate or reenter known boreholes for additional characterization or remedial action. The Salt Repository Project (SRP) Networks specify the schedule under which the program will operate. The Technical Field Services Contractor (TFSC) is responsible for conducting the field program. Data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 13 refs., 6 figs., 3 tabs

  2. Low-level waste disposal site selection demonstration

    International Nuclear Information System (INIS)

    Rogers, V.C.

    1984-01-01

    This paper discusses the results of recent studies undertaken at EPRI related to low-level waste disposal technology. The initial work provided an overview of the state of the art including an assessment of its influence upon transportation costs and waste form requirements. The paper discusses work done on the overall system design aspects and computer modeling of disposal site performance characteristics. The results of this analysis are presented and provide a relative ranking of the importance of disposal parameters. This allows trade-off evaluations to be made of factors important in the design of a shallow land burial facility. To help minimize the impact of a shortage of low-level radioactive waste disposal sites, EPRI is closely observing the development of bellweather projects for developing new sites. The purpose of this activity is to provide information about lessons learned in those projects in order to expedite the development of additional disposal facilities. This paper describes most of the major stems in selecting a low-level radioactive waste disposal site in Texas. It shows how the Texas Low-Level Radioactive Waste Disposal Authority started with a wide range of potential siting areas in Texas and narrowed its attention down to a few preferred sites. The parameters used to discriminate between large areas of Texas and, eventually, 50 candidate disposal sites are described, along with the steps in the process. The Texas process is compared to those described in DOE and EPRI handbooks on site selection and to pertinent NRC requirements. The paper also describes how an inventory of low-level waste specific to Texas was developed and applied in preliminary performance assessments of two candidate sites. Finally, generic closure requirements and closure operations for low-level waste facilities in arid regions are given

  3. Hydrogeologic testing plan for Deep Hydronest Test Wells, Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    1987-12-01

    This report discusses methods of hydraulic testing which are recommended for use in the Deep Hydronest Test Wells at the proposed high level nuclear waste repository site in Deaf Smith County, Texas. The deep hydronest wells are intended to provide geologic, geophysical and hydrologic information on the interval from the Upper San Andres Formation to the base of the Pennsylvanian system at the site. Following the period of drilling and testing, the wells will be converted into permanent monitoring installations through which fluid pressures and water quality can be monitored at various depths in the section. 19 refs., 17 figs., 2 tabs

  4. Sonar atlas of caverns comprising the U.S. Strategic Petroleum Reserve. Volume 2, Big Hill Site, Texas.

    Energy Technology Data Exchange (ETDEWEB)

    Rautman, Christopher Arthur; Lord, Anna Snider

    2007-08-01

    Downhole sonar surveys from the four active U.S. Strategic Petroleum Reserve sites have been modeled and used to generate a four-volume sonar atlas, showing the three-dimensional geometry of each cavern. This volume 2 focuses on the Big Hill SPR site, located in southeastern Texas. Volumes 1, 3, and 4, respectively, present images for the Bayou Choctaw SPR site, Louisiana, the Bryan Mound SPR site, Texas, and the West Hackberry SPR site, Louisiana. The atlas uses a consistent presentation format throughout. The basic geometric measurements provided by the down-cavern surveys have also been used to generate a number of geometric attributes, the values of which have been mapped onto the geometric form of each cavern using a color-shading scheme. The intent of the various geometrical attributes is to highlight deviations of the cavern shape from the idealized cylindrical form of a carefully leached underground storage cavern in salt. The atlas format does not allow interpretation of such geometric deviations and anomalies. However, significant geometric anomalies, not directly related to the leaching history of the cavern, may provide insight into the internal structure of the relevant salt dome.

  5. Sonar atlas of caverns comprising the U.S. Strategic Petroleum Reserve. Volume 3, Bryan Mound Site, Texas.

    Energy Technology Data Exchange (ETDEWEB)

    Rautman, Christopher Arthur; Lord, Anna Snider

    2007-09-01

    Downhole sonar surveys from the four active U.S. Strategic Petroleum Reserve sites have been modeled and used to generate a four-volume sonar atlas, showing the three-dimensional geometry of each cavern. This volume 3 focuses on the Bryan Mound SPR site, located in southeastern Texas. Volumes 1, 2, and 4, respectively, present images for the Bayou Choctaw SPR site, Louisiana, the Big Hill SPR site, Texas, and the West Hackberry SPR site, Louisiana. The atlas uses a consistent presentation format throughout. The basic geometric measurements provided by the down-cavern surveys have also been used to generate a number of geometric attributes, the values of which have been mapped onto the geometric form of each cavern using a color-shading scheme. The intent of the various geometrical attributes is to highlight deviations of the cavern shape from the idealized cylindrical form of a carefully leached underground storage cavern in salt. The atlas format does not allow interpretation of such geometric deviations and anomalies. However, significant geometric anomalies, not directly related to the leaching history of the cavern, may provide insight into the internal structure of the relevant salt dome.

  6. Cultural resources survey and assessment of the proposed Department of Energy Freeport to Texas City pipeline, Brazoria and Galveston Counties, Texas. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Castille, G.J.; Whelan, J.P. Jr.

    1986-01-01

    An intensive survey and testing program of selected segments of a proposed Department of Energy pipeline were conducted by Coastal Environments, Inc., Baton Rouge, Louisiana, during December 1985 and January 1986. The proposed pipeline runs from Texas City, Galveston County to Bryan Mound, Brazoria County. The pedestrian survey was preceded by historical records survey to locate possible historic sites within the DOE righ-of-way. Four prehistoric sites within the ROW (41BO159, 160, 161, 162) and one outside the ROW (41BO163) were located. All are Rangia cuneata middens. The survey results are discussed with particular reference to the environmental settings of the sites and the effectiveness of the survey procedure. Two of the sites located within the ROW were subjected to additional testing. The results of the backhoe testing program are included in the site descriptions, and the scientific value of the sites are presented. 52 refs., 20 figs., 10 tabs.

  7. Preliminary access routes and cost study analyses for seven potentially acceptable salt sites: Final report, October 1984

    International Nuclear Information System (INIS)

    1987-02-01

    This report analyzes highway and railroad access to seven potentially acceptable salt repository sites: Richton Dome and Cypress Creek Dome in Mississippi, Vacherie Dome in Louisiana, Swisher County and Deaf Smith County in Texas, and Davis Canyon and Lavender Canyon in utah. The objectives of the study were to investigate the routing of reasonable access corridors to the sites, describe major characteristics of each route, and estimate the costs for constructing or upgrading highways and railroads. The routes used in the analysis are not necessarily recommended or preferred over other routes, nor do they represent an implied final selection. Detailed engineering studies must be performed for the Davis Canyon and Lavender Canyon highway access before the analyzed routes can be considered to be viable. 20 refs., 7 figs., 3 tabs

  8. Long-term surveillance plan for the Falls City Disposal Site, Falls City, Texas

    International Nuclear Information System (INIS)

    1995-06-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project Falls City disposal site, Falls City, Texas, describes the surveillance activities for the disposal site. DOE will carry out these activities to ensure that the disposal cell continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials. This LTSP documents whether the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a)

  9. Site study plan for Playa investigations, Deaf Smith County, Texas: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    This plan defines the purpose and objectives of the Playa Investigation Study, presents a plan of work to provide the information necessary to resolve issues, and discusses the rationale for test method selection. The required information will be obtained from existing well drilling records, describing and testing of soil and rock samples recovered from project test holes, geophysical well logs, seismic surveys, and shallow test pits excavated at ground surface. There have been numerous, often conflicting, theories presented to explain the origin(s) of the playas of the Texas High Plains. The primary purpose of this study is to establish if existing playas and playa alignments are related to deeper subsurface structure, such as faulting or salt dissolution, the potential for future playa development, and the significance of existing and/or future playas on siting a repository in Deaf Smith County, Texas. 11 refs

  10. Petroleum potential of two sites in Deaf Smith and Swisher Counties, Texas Panhandle: Volume 1: Technical report

    International Nuclear Information System (INIS)

    Rose, P.R.

    1986-09-01

    This is the third in a series of regional geologic studies to assess the petroleum resources of two potentially acceptable sites under study for a nuclear waste disposal facility. Site 1 is in northeastern Deaf Smith County, Texas, and Site 2 is in northeastern Swisher County, Texas. Although potential reservoir zones are present under Site 1, the likelihood of hydrocarbon charge and structural or stratigraphic entrapment is low. The probability of a commercial petroleum discovery is estimated at 1:1000, and expected net present value of potential production is about $700,000. Little future industry drilling activity is foreseen around Site 1. Five potential reservoir zones are present under Site 2, and some may contain hydrocarbons. Anticlines are adjacent to Site 2, and some may contain hydrocarbons. Anticlines are adjacent to Site 2 on the northeast, southeast, and northwest, but the middle of the acreage block is synclinal, and its petroleum potential is very low. Discovery probability of the structures adjacent to Site 2 is higher, but the chance of developing commercial production is only about 2:100. Such accumulations might extend into the northeast and southeast corners of the block; expected net present value of such conjectured reserves is about $1,100,000 and $650,000, respectively. Continued industry activity pursuant to these three structures is expected, including seismic surveys and drilling. Considering the potential loss of petroleum resources through withdrawal of acreage from exploration, and the possibility of adjacent drilling, Site 1 in Deaf Smith County is clearly preferable for location of the proposed nuclear waste disposal facility

  11. Site observational work plan for the UMTRA project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1994-09-01

    During surface remedial action, an estimated 7.0 million tons (6.4 million tonnes) of uranium mill tailings and other contaminated materials were consolidated and stabilized on the Falls City site. The ground water protection strategy at the Falls City disposal site for the UMTRA Surface Project (Subpart A of 40 CFR Part 192 (1994)) was an application for supplemental standards, based on Class III (limited use) ground water in the uppermost aquifer. This water is not a current or potential source of drinking water. Ground water from the uppermost aquifer (ground water from the Deweesville/Conquista Members and the Dilworth Member) contains widespread ambient contamination resulting from naturally occurring conditions and from the effects of human activity not related to uranium milling operations (uranium exploration and mining activities). The ground water cannot be effectively cleaned up for drinking or other beneficial purposes using treatment methods reasonably employed by public water supply systems. The U.S. Nuclear Regulatory Commission (NRC) and the state of Texas concurred with the ground water protection strategy for the disposal site in September 1992. Surface remedial action in accord with Subpart A was completed in April 1994. The proposed ground water compliance strategy (Subpart B of 40 CFR Part 192 (1994)) at the Falls City site is to perform no remedial action based on application for supplemental standards because the ground water in the uppermost aquifer is classified as Class III ground water. Class III ground water includes ground water that is not a current or potential source of drinking water because of widespread, ambient contamination that cannot be cleaned up using treatment methods reasonably employed by public water supply systems (40 CFR section 192.11 (e) (1994)). Although supplemental standards are being applied, the potential use of ground water in the site vicinity will be protected

  12. Wind/solar resource in Texas

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, V.; Starcher, K.; Gaines, H. [West Texas A& M Univ., Canyon, TX (United States)

    1997-12-31

    Data are being collected at 17 sites to delineate a baseline for the wind and solar resource across Texas. Wind data are being collected at 10, 25, and 40 m (in some cases at 50 m) to determine wind shear and power at hub heights of large turbines. Many of the sites are located in areas of predicted terrain enhancement. The typical day in a month for power and wind turbine output was calculated for selected sites and combination of sites; distributed systems. Major result to date is that there is the possibility of load matching in South Texas during the summer months, even though the average values by month indicate a low wind potential.

  13. Engineering assessment of inactive uranium mill tailings, Ray Point Site, Ray Point, Texas. Phase II, Title I

    International Nuclear Information System (INIS)

    1977-12-01

    Results are reported from an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Ray Point, Texas. The Phase II--Title I services generally include the preparation of topographic maps, the performance of soil sampling and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. About 490,000 tons of ore were processed at this mill with all of the uranium sold on the commercial market. None was sold to the AEC; therefore, this report focuses on a physical description of the site and the identification of radiation pathways. No remedial action options were formulated for the site, inasmuch as none of the uranium was sold to the AEC and Exxon Corporation has agreed to perform all actions required by the State of Texas. Radon gas release from the tailings at the Ray Point site constitutes the most significant environmental impact. Windblown tailings, external gamma radiation and localized contamination of surface waters are other environmental effects. Exxon is also studying the feasibility of reprocessing the tailings

  14. 78 FR 42700 - Radio Broadcasting Services; Matagorda, Texas

    Science.gov (United States)

    2013-07-17

    ... Broadcasting Services; Matagorda, Texas AGENCY: Federal Communications Commission. ACTION: Final rule. SUMMARY... FM Channel 252A at Matagorda, Texas. This allotment change is part of a hybrid rule making and FM... 291A at Matagorda, Texas, is located within 320 kilometers (199 miles) of the U.S.-Mexican border...

  15. Site selection - siting of the final repository for spent nuclear fuel

    International Nuclear Information System (INIS)

    2011-03-01

    SKB has selected Forsmark as the site for the final repository for spent nuclear fuel. The site selection is the end result of an extensive siting process that began in the early 1990s. The strategy and plan for the work was based on experience from investigations and development work over a period of more than ten years prior to then. This document describes the siting work and SKB's choice of site for the final repository. It also presents the information on which the choice was based and the reasons for the decisions made along the way. The document comprises Appendix PV to applications under the Nuclear Activities Act and the Environmental Code for licences to build and operate an encapsulation plant adjacent to the central interim storage facility for spent nuclear fuel in Oskarshamn, and to build and operate a final repository for spent nuclear fuel in Forsmark in Oesthammar Municipality

  16. Site selection - siting of the final repository for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    2011-03-15

    SKB has selected Forsmark as the site for the final repository for spent nuclear fuel. The site selection is the end result of an extensive siting process that began in the early 1990s. The strategy and plan for the work was based on experience from investigations and development work over a period of more than ten years prior to then. This document describes the siting work and SKB's choice of site for the final repository. It also presents the information on which the choice was based and the reasons for the decisions made along the way. The document comprises Appendix PV to applications under the Nuclear Activities Act and the Environmental Code for licences to build and operate an encapsulation plant adjacent to the central interim storage facility for spent nuclear fuel in Oskarshamn, and to build and operate a final repository for spent nuclear fuel in Forsmark in Oesthammar Municipality

  17. Site study plan for non-routine laboratory rock mechanics, Deaf Smith County Site, Texas: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    This Site Study Plan describes the non-routine rock mechanics and thermal properties laboratory testing program planned for the characterization of site-specific geologic materials for the Deaf Smith County site, Texas. The study design provides for measurements of index, mechanical, thermomechanical, thermal and special properties for the host salt, and where appropriate, for nonhost lithologies. The types of tests which will be conducted are constant stress (creep) tests, constant strain (stress relaxation) tests, constant strain-rate tests, constant stress-rate tests, cyclic loading tests, hollow cylinder tests, uniaxial and triaxial compression tests, direct tension tests, indirect (triaxial) shear tests, thermal property determinations (conductivity, specific heat, expansivity, and diffusivity), fracture healing tests, thermal decrepitation tests, moisture content determinations, and petrographic and micromechanics analyses. Tests will be conducted at confining pressures up to 30 MPa and temperatures up to 300/degree/C. These data are used to construct mathematical models for the phenomenology of salt deformation. The models are then used in finite-element codes to predict repository response. A tentative testing schedule and milestone log are given. The duration of the testing program is expected to be approximately 5 years. 44 refs., 13 figs., 13 tabs

  18. High-level radioactive-waste-disposal investigations in Texas

    International Nuclear Information System (INIS)

    Smith, R.D.

    1983-01-01

    The Texas Energy and Natural Resources Advisory Council (TENRAC) was designated in 1980 to coordinate the interaction between the State of Texas and the federal government relating to the high-level radioactive waste disposal issue. This report was prepared to summarize the many aspects of that issue with particular emphasis on the activities in Texas. The report is intended to provide a comprehensive introduction for individuals with little or no previous exposure to the issue and to provide a broader perspective for those individuals who have addressed specific aspects of the issue but have not had the opportunity to study it in a broader context. Following the introduction, contents of this report are as follows: (1) general status of major repository siting investigations in the US; (2) detailed review of Texas studies; (3) possible facilities to be sited in Texas; (4) current Texas policy; (5) federal regulations; and (6) federal legislation. 9 figures, 2 tables

  19. Beach Geomorphology and Kemp's Ridley (Lepidochelys kempii) Nest Site Selection along Padre Island, Texas, USA

    Science.gov (United States)

    Culver, M.; Gibeaut, J. C.; Shaver, D. J.; Tissot, P.; Starek, M. J.

    2017-12-01

    The Kemp's ridley sea turtle (Lepidochelys kempii) is the most endangered sea turtle in the world, largely due to the limited geographic range of its nesting habitat. In the U.S., the majority of nesting occurs along Padre Island National Seashore (PAIS) in Texas. There has been limited research regarding the connection between beach geomorphology and Kemp's ridley nesting patterns, but studies concerning other sea turtle species suggest that certain beach geomorphology variables, such as beach slope and width, influence nest site selection. This research investigates terrestrial habitat variability of the Kemp's ridley sea turtle and quantifies the connection between beach geomorphology and Kemp's ridley nest site selection on PAIS and South Padre Island, Texas. Airborne topographic lidar data collected annually along the Texas coast from 2009 through 2012 was utilized to extract beach geomorphology characteristics, such as beach slope and width, dune height, and surface roughness, among others. The coordinates of observed Kemp's ridley nests from corresponding years were integrated with the aforementioned data in statistical models, which analyzed the influence of both general trends in geomorphology and individual morphologic variables on nest site selection. This research identified the terrestrial habitat variability of the Kemp's ridley and quantified the range of geomorphic characteristics of nesting beaches. Initial results indicate that dune width, beach width, and wind speed are significant variables in relation to nest presence, using an alpha of 0.1. Higher wind speeds and narrower beaches and foredunes favor nest presence. The average nest elevation is 1.13 m above mean sea level, which corresponds to the area directly below the potential vegetation line, and the majority of nesting occurs between the elevations of 0.68 m and 1.4 m above mean sea level. The results of this study include new information regarding Kemp's ridley beach habitat and its

  20. 75 FR 14359 - FM TABLE OF ALLOTMENTS, Stonewall, Texas

    Science.gov (United States)

    2010-03-25

    ... TABLE OF ALLOTMENTS, Stonewall, Texas AGENCY: Federal Communications Commission. ACTION: Final rule... allotment of Channel 280A at Stonewall, Texas, as the community's first local transmission service. The..., Texas. It is Commission policy to protect applications against subsequently-filed and conflicting rule...

  1. Comment and response document for the long-term surveillance plan for the Falls City disposal site, Falls City, Texas

    International Nuclear Information System (INIS)

    1996-11-01

    This is the Comment and Response Document dated November 1996 for the Long-Term Surveillance Plan for the Falls City Disposal Site in Falls City, Texas. The site is part of the U.S. DOE's Uranium Mill Tailings Remedial Action Project (UMTRA). Several comments regarding the hydrology and surface erosion described in the Long-Term Surveillance Plan are addressed in this document

  2. Technical procedures for implementation of acoustics site studies, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-09-01

    The purpose and scope of the technical procedure for processing data from the tethered meteorological system are covered. Definitions, interfaces, and concurrent data needs are also addressed. This technical procedure describes how to control, organize, verify, and archive tethered meteorological system data. These data will be received at the processing location from the field measurement location and are part of the characterization of the Deaf Smith County Site, Texas for the salt repository program. These measurements will be made in support of the sound propagation study and are a result of environmental data requirements for acoustics. 6 refs., 15 figs., 5 tabs

  3. Commercial Space Port Planning in Texas

    Science.gov (United States)

    Bell, L.; Looke, B.

    2002-01-01

    The Texas Legislature is providing funding to support research and planning activities aimed at creating a commercial spaceport in the state. These monies have been allocated to regional Spaceport Development Corporations that have been established in three countries containing candidate site locations: Willacy County (in South Texas); Brazoria County (East Texas); and Pecos County (West Texas). This program is being sponsored and coordinated by the Texas Aerospace Commission (TAC). The Sasakawa International Center for Space Architecture (SICSA) at the University of Houston is providing research, planning and design support to TAC and is a member of each of the three regional development teams. Planning must carefully consider special support requirements and operational characteristics of all prospective launch systems along with geographic, infrastructure and environmental factors at each site. Two of the candidate sites are in coastal areas; a priority for certain launch service providers; whereas the third inland site is more attractive to others. Candidate launch systems include winged horizontal takeoff air-launch vehicles, vertical multi-stage reusable launch vehicles, and expendable sub-orbital surrounding rockets. Important research and planning activities include environmental impact assessments, analyses of overflight hazards, investigations of economic impacts and business plan development. The results of these activities will guide master plan development for each site, including: a physical plan (site layout, infrastructure improvements and facility construction); and a strategic plan (user agreements, licenses, finance sources and participants). Commercial spaceport development demands compliance with stringent FAA regulations established by the Office of Commercial Space Transportation (OCST) which exceed minimum standards allowed for U.S. Government spaceport facilities. Key among these requirements are 15,000 ft. radius on-site clear zones

  4. Long-term Surveillance Plan for the Falls City Disposal Site, Falls City, Texas. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project Falls City disposal site, Falls City, Texas, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials. This LTSP documents whether the land and interests are owned by the United States and details how long-term care of the disposal site will be carried out. It is based on the DOE's Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a)

  5. Site study plan for utilities and solid waste, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    This site plan describes utilities and solid waste studies to be conducted during the characterization of the Deaf Smith County, Texas, site for the US Department of Energy's Salt Repository Project. After utilities and solid waste information needs derived from Federal, State, and local statutes and regulations and the project specifications are briefly described, the site study plan describes the study design and rationale, the field data collection procedures and equipment, and data analysis methods and application of results, the data management strategy, the schedule of field activities, the management of the study, and the study's quality assurance program. The field data collection activities are organized into programs to characterize electrical power, natural gas, communication, water, wastewater sludge, nonradiological solid waste, nonradiological hazardous waste, and low-level radiological waste. These programs include details for the collection of project needs, identification of utilities and solid waste disposal contractor capabilities, and verification of the obtained data. Utilities and solid waste field activities will begin approximately at the time of site access. Utilities and solid waste characterization will be completed within the first year of activity. 29 refs., 6 figs., 2 tabs

  6. Site study plan for Upper Aquifer Hydrology Clusters, Deaf Smith County Site, Texas: Surface-based geotechnical field program: Preliminary draft

    International Nuclear Information System (INIS)

    1988-01-01

    As part of site characterization studies, at the Deaf Smith County site, Texas, 15 wells at 5 locations will be completed in the Ogallala Formation and Dockum Group. The purposes of the wells, which are called Upper Aquifer (2) establish background hydrologic and water quality conditions, (3) provide analysis, (4) monitor responses of the shallow hydrologic system to site activities and nearby pumpage for irrigation, (5) collect water samples from both saturated and unsaturated materials to help define recharge rates and ground-water flow patterns, (6) monitor variations on water quality, and (7) define ground-water resources near the site. The test wells will be installed during a 14-month period starting about 1-1/2 years after site characterization activities begin. The Technical Field Services Contractor is responsible for conducting the field program of drilling and testing. Samples and data will be handled and reported in accordance with established Salt Repository Project procedures. A quality assurance program will assure that activities affecting quality are performed correctly and that the appropriate documentation is maintained. 44 refs., 19 figs., 5 tabs

  7. Direct-current resistivity profiling at the Pecos River Ecosystem Project study site near Mentone, Texas, 2006

    Science.gov (United States)

    Teeple, Andrew; McDonald, Alyson K.; Payne, Jason; Kress, Wade H.

    2009-01-01

    The U.S. Geological Survey, in cooperation with Texas A&M University AgriLife, did a surface geophysical investigation at the Pecos River Ecosystem Project study site near Mentone in West Texas intended to determine shallow (to about 14 meters below the water [river] surface) subsurface composition (lithology) in and near treated (eradicated of all saltcedar) and control (untreated) riparian zone sites during June-August 2006. Land-based direct-current resistivity profiling was applied in a 240-meter section of the riverbank at the control site, and waterborne direct-current continuous resistivity profiling (CRP) was applied along a 2.279-kilometer reach of the river adjacent to both sites to collect shallow subsurface resistivity data. Inverse modeling was used to obtain a nonunique estimate of the true subsurface resistivity from apparent resistivity calculated from the field measurements. The land-based survey showed that the sub-surface at the control site generally is of relatively low resis-tivity down to about 4 meters below the water surface. Most of the section from about 4 to 10 meters below the water surface is of relatively high resistivity. The waterborne CRP surveys convey essentially the same electrical representation of the lithology at the control site to 10 meters below the water surface; but the CRP surveys show considerably lower resistivity than the land-based survey in the subsection from about 4 to 10 meters below the water surface. The CRP surveys along the 2.279-kilometer reach of the river adjacent to both the treated and control sites show the same relatively low resistivity zone from the riverbed to about 4 meters below the water surface evident at the control site. A slightly higher resistivity zone is observed from about 4 to 14 meters below the water surface along the upstream approximately one-half of the profile than along the downstream one-half. The variations in resistivity could not be matched to variations in lithology because

  8. Dealing with the inevitable: Strategies of self-presentation and meaning construction in the final statements of inmates on Texas death row

    NARCIS (Netherlands)

    Schuck, A.R.T.; Ward, J.

    2008-01-01

    Last statements of death row inmates represent a genre of discourse characterized by an acute situation in which to express final reflections. This article describes how Texas death row inmates give meaning to their situation by examining their last statements. Between December 1982 and November

  9. Compliance status summaries for federal and state statutory directives that apply to the Salt Repository Project at the Deaf Smith County Site, Texas

    International Nuclear Information System (INIS)

    1986-07-01

    This document contains statutory summaries, checklists of compliance requirements, status summaries, and lists of information needs for the environmental and health and safety statutory directives at Federal and State levels that apply to the Salt Repository Project at the Deaf Smith County Site, Texas. Statutes that apply in general to any repository project but not specifically to the Deaf Smith are not included. The information herein supplements the Salt Repository Project Statutory Compliance Plan and the Salt Repository Project Permitting Management Plan by providing lengthy details on statutory directives, compliance requirements, information needs, and the overall status of the environmental and health and safety compliance program for the Salt Repository Project at the Deaf Smith County Site, Texas

  10. Site study plan for exploratory shaft monitoring wells, Deaf Smith County Site, Texas: Preliminary Draft

    International Nuclear Information System (INIS)

    1988-01-01

    As part of site characterization studies, two exploratory shafts will be constructed at the Deaf Smith County site, Texas. Twelve wells at five locations have been proposed to monitor potential impacts of shaft construction on water-bearing zones in the Ogallala Formation and the Dockum Group. In addition, tests have been proposed to determine the hydraulic properties of the water-bearing zones for use in design and construction of the shafts. Samples of the Blackwater Draw Formation, Ogallala Formation, and Dockum Group will be obtained during construction of these wells. Visual indentification, laboratory testing, and in situ testing will yield data necessary for Exploratory Shaft Facility design and construction. This activity provides the earliest data on the Blackwater Drew Formation, Ogallala Formation, and Dockum Group near the exploratory shaft locations. Drilling and hydrologic testing are scheduled prior to other subsurface activity at the Exploratory Shaft Facility to establish ground-water baseline conditions. The Technical Field Services Contractor is responsible for conducting the field program of drilling and testing. Samples and data will be handled and reported in accordance with established Salt Repository Project procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that the appropriate documentation is maintained. 45 refs., 11 figs., 4 tabs

  11. Review of site recommendation process in Draft Environmental Assessments

    International Nuclear Information System (INIS)

    Joy, H.; Longo, T.; Burton, E.S.

    1985-01-01

    In December 1984, the US Department of Energy (DOE) published Draft Environmental Assessments (EAs) on nine potentially acceptable nuclear waste repository sites. Five sites in the states of Mississippi, Nevada, Texas, Utah, and Washington were proposed in the Draft EAs for nomination under the Nuclear Waste Policy Act as suitable for further detailed study (site characterization). The Nevada, Texas, and Washington sites were further proposed for recommendation to the President as preferred for site characterization. This paper reviews the process that DOE used in selecting the three sites proposed for site characterization. The process is consistent with DOE's implementation guidelines for selecting repository sites, and proceeds in three steps. First, the sites are ranked in order of preference for each of twenty technical guidelines based on information in the Draft EAs. The second step combines the individual guideline rankings into postclosure and preclosure guideline group rankings, and, finally, into an overall ranking. In the third step, the sensitivity of the choice of the three preferred sites is examined for a range of guideline weightings

  12. Texas Hydrogen Highway Fuel Cell Hybrid Bus and Fueling Infrastructure Technology Showcase - Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hitchcock, David

    2012-06-29

    The Texas Hydrogen Highway project has showcased a hydrogen fuel cell transit bus and hydrogen fueling infrastructure that was designed and built through previous support from various public and private sector entities. The aim of this project has been to increase awareness among transit agencies and other public entities on these transportation technologies, and to place such technologies into commercial applications, such as a public transit agency. The initial project concept developed in 2004 was to show that a skid-mounted, fully-integrated, factory-built and tested hydrogen fueling station could be used to simplify the design, and lower the cost of fueling infrastructure for fuel cell vehicles. The approach was to design, engineer, build, and test the integrated fueling station at the factory then install it at a site that offered educational and technical resources and provide an opportunity to showcase both the fueling station and advanced hydrogen vehicles. The two primary technology components include: Hydrogen Fueling Station: The hydrogen fueling infrastructure was designed and built by Gas Technology Institute primarily through a funding grant from the Texas Commission on Environmental Quality. It includes hydrogen production, clean-up, compression, storage, and dispensing. The station consists of a steam methane reformer, gas clean-up system, gas compressor and 48 kilograms of hydrogen storage capacity for dispensing at 5000 psig. The station is skid-mounted for easy installation and can be relocated if needed. It includes a dispenser that is designed to provide temperaturecompensated fills using a control algorithm. The total station daily capacity is approximately 50 kilograms. Fuel Cell Bus: The transit passenger bus built by Ebus, a company located in Downey, CA, was commissioned and acquired by GTI prior to this project. It is a fuel cell plug-in hybrid electric vehicle which is ADA compliant, has air conditioning sufficient for Texas operations

  13. Addressing concerns about the agricultural impacts of siting a nuclear waste repository in Texas

    International Nuclear Information System (INIS)

    Boryczka, M.; Darrough, B.

    1986-01-01

    Public concerns related to the siting of a nuclear repository have included the potential impacts to specific economic sectors. In Texas, local residents have expressed concern about how a repository will affect agriculture. Several major questions have arisen with respect to this issue including: 1) how will a repository's requirements for land and water affect agriculture, 2) how will a repository affect agricultural land values, and 3) how will actual or perceived contamination of locally grown products affect their marketability? This paper describes the concerns raised by local residents and discusses the approach to analyzing the concerns identified. An evaluation of agricultural impacts has been prepared for the Department of Energy's Enviromental Assessment (EA) documents. In addition, activities needed to further evaluate these impacts are planned for site characterization. Both the current analysis and planned activities are described

  14. High energy physics program at Texas A&M University. Final report, April 1, 1990--March 31, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The Texas A&M experimental high energy physics program has been supported since its inception by DOE Contract DE-AS05-81ER40039. During that period we established a viable experimental program at a university which before this time had no program in high energy physics. In 1990, the experimental program was augmented with a program in particle theory. In the accompanying final report, we outline the research work accomplished during the final year of this contract and the program being proposed for consideration by the Department of Energy for future grant support. Some of the particular areas covered are: Collider detector at Fermilab program; the TAMU MACRO program; SSC R&D program; SSC experimental program; and theoretical physics program.

  15. Migration and habitat preferences of Swainson's Hawks at an autumn stopover site in northwestern Texas

    Science.gov (United States)

    Littlefield, Carroll D.; Johnson, Douglas H.

    2013-01-01

    Unlike most raptors, the Swainson's Hawk (Buteo swainsoni) migrates long distances between breeding and wintering ranges, which elevates the importance of stopover sites for foraging. We conducted three years of fall surveys in the Southern High Plains of Texas. Migrant Swainson's Hawks moved through the area mostly between July and mid-October, peaking in September. Subadults tended to migrate earlier than adults, and light morphs before dark morphs. Favored foraging habitats included silage corn, green beans, and alfalfa, but the hawks foraged primarily where ongoing agricultural activities disturbed prey and made them more available.

  16. Public health assessment for French Limited, Crosby, Harris County, Texas, Region 6. CERCLIS No. TXD980514814. addendum. Final report

    International Nuclear Information System (INIS)

    1993-01-01

    The French Limited Site is a former petroleum based waste disposal site located in Harris County about 20 miles northeast of Houston, Texas. Although there is evidence of past exposure to site contaminants, the site currently poses no apparent public health hazard. Since part of the remediation process involves aerating the lagoon, future inhalation exposure to volatile organic compounds through inhalation is possible. Modeling data, based on fenceline measurements taken during lagoon aeration, were used to estimate contaminant concentrations in each of the surrounding communities. The ambient air concentrations predicted by the model, for each of the communities, are upper-bound estimates and greatly overestimate actual ambient air levels. Based on the predicted values, the residents in the surrounding communities have no apparent increased lifetime risk of developing cancer from exposure to these contaminants

  17. South Texas project, Units 1 and 2: Final environmental statement (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1975-03-01

    The proposed action is the issuance of a construction permit to the Houston Lighting and the Power Company, acting as Project manager on behalf of itself, the City Public Service Board of San Antonio, Central Power and Light Company, and the City of Austin, for the construction of the South Texas Project (STP) Units 1 and 2, located in Matagorda County, Texas. A total of 12,352 acres will be utilized for the STP site. Construction-related activities on the site will disturb about 610 acres not including the 7310 acres of inundated by the STP cooling lake and embankments, which will be constructed in conjunction with the project. Approximately 400 miles of transmission-line corridors will require about 5685 acres of land for the right-of-way. An access road and a railroad spur will affect about 60 acres. Farm to Market Road 521 will be rerouted north around the STP exclusion area. Plant construction will involve extensive community impacts. Two families will be displaced from the site. Traffic on local roads will increase due to construction and commuting activities. The influx of construction workers' families (2100 peak work force) is expected to cause no major housing or school problems. There will be a demand for increased services in Matagorda County. The proposed plan to alter Little Robbins Slough and the resultant 65% reduction in the watershed supplying freshwater inflow to the upper marsh may cause the displacement of numerous freshwater species and reduce its desirability as a nursery for estuarine-dependent organisms. Studies to determine the need for freshwater makeup will be required. 39 figs., 76 tabs

  18. Implementation and effectiveness of sound mitigation measures on Texas highways (HB 790) : final report.

    Science.gov (United States)

    2016-10-01

    The 84th Texas Legislature passed House Bill (HB) 790 directing the Texas A&M Transportation Institute (TTI) to perform a study on the implementation and effectiveness of sound mitigation measures on the state highway system and certain toll roads an...

  19. Texas transportation planning for future renewable energy projects : final report.

    Science.gov (United States)

    2017-03-01

    There will be a significant increase in the number of renewable energy production facilities in Texas. The : construction of wind farms requires the transport of wind turbine components that create increased loads on : rural roads and bridges. These ...

  20. Status report on Texas Low-Level Radioactive Waste Disposal Authority activities

    International Nuclear Information System (INIS)

    Avant, R.V. Jr.

    1990-01-01

    In 1981, the Texas Low-Level Radioactive Waste Disposal Authority was created by Article 4590f-1 to site, develop, operate, decommission, and close a low-level radioactive waste disposal facility for Texas generated waste. In 1989, the Authority's act was recodified by the Texas legislature in the Health and Safety Code., Title 5. Sanitation and Environmental Quality, Subtitle D. Nuclear and Radioactive Materials, Chapter 402. The Authority is governed by a Board of Directors appointed by the Governor, composed of a certified health physicist, geologist, attorney, medical doctor, and two private citizens. Under the statute, low-level radioactive waste is defined as any radioactive material with a half-life of 35 years or less or having less than 10 nanocuries per gram of transuranics. Materials with half-lives of greater than 35 years may be classed as low-level waste if special criteria are established by the Texas Department of Health Bureau of Radiation Control. Subsequent sessions of the legislature have amended the act to revise siting criteria, require consideration of state land, create a Citizen's Advisory Committee, incorporate alternative designs, and establish a special low-level radioactive waste account in the state treasury. The Authority began its activities in 1982. The Authority has proposed a site in far West Texas near Fort Hancock, but El Paso County, the neighboring county to the west, has instituted three separate lawsuits to slow or stop the site selection process. Particular attention was paid early in the site selection process to items which could be fatal flaws from a licensing standpoint. This paper discusses the Fort Hancock site description, site evaluation studies, siting issues, waste volume projections, facility design, license application, cost and schedule

  1. Umatilla Satellite and Release Sites Project : Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  2. Phase II, Title I engineering assessment of inactive uranium mill tailings, Falls City Site, Falls City, Texas

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at Falls City, Texas. Services included taking soil samples, the performance of radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 2.5 million tons of tailings at the Falls City site constitutes the most significant environmental impact. Windblown tailings, external gamma radiation and localized contamination of surface waters are other environmental effects. The two alternative remedial action options presented include on-site and off-site cleanup, fencing, and hydrological monitoring, and in addition, stabilization of pile 2 with 2 ft of cover material. The costs are $1.84 million for Option I and $2.45 million for Option II

  3. Texas' performance assessment work

    International Nuclear Information System (INIS)

    Charbeneau, R.J.; Hertel, N.E.; Pollard, C.G.

    1990-01-01

    The Texas Low-Level Radioactive Waste Disposal Authority is completing two years of detailed on-site suitability studies of a potential low-level radioactive waste disposal site in Hudspeth County, Texas. The data from these studies have been used to estimate site specific parameters needed to do a performance assessment of the site. The radiological impacts of the site have been analyzed as required for a license application. The approach adopted for the performance assessment was to use simplified and yet conservative assumptions with regard to releases, radionuclide transport, and dose calculations. The methodologies employed in the performance assessment are reviewed in the paper. Rather than rely on a single computer code, a modular approach to the performance assessment was selected. The HELP code was used to calculate the infiltration rate through the trench covers and the amount of leachate released from this arid site. Individual pathway analyses used spreadsheet calculations. These calculations were compared with those from other computer models including CRRIS, INGDOS, PATHRAE, and MICROSHIELD copyright, and found to yield conservative estimates of the effective whole body dose. The greatest difficulty in performing the radiological assessment of the site was the selection of reasonable source terms for release into the environment. A surface water pathway is unreasonable for the site. Though also unlikely, the groundwater pathway with exposure through a site boundary well was found to yield the largest calculated dose. The more likely pathway including transport of leachate from the facility through the unsaturated zone and returning to the ground surface yields small doses. All calculated doses associated with normal releases of radioactivity are below the regulatory limits

  4. Northeast Oregon Hatchery Project final siting report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  5. The Texas concurrent characterization, licensing, and development process

    Energy Technology Data Exchange (ETDEWEB)

    Avant, R.V. Jr. [Texas Low-Level Radioactive Waste Disposal Authority, Austin, TX (United States)

    1993-03-01

    The 72nd Texas Legislature specifically delineated a 400-square-mile area in southeast Hudspeth County where siting activities would be limited. The Authority was given unprecedented powers of property access and eminent domain and expanded budget authority to conduct site selection, characterization, and licensing. In the summer of 1991, the Authority identified five general siting areas in the prescribed region, and in the fall of 1991, the Authority narrowed the siting area to one large ranch composed of about 16,000 acres--called the Faskin Ranch. Site characterization began in 1991 and will be complete by September 1993. In September 1991, Authority staff began preparing the license application and included all available information on the Faskin Ranch. At its February meeting, the Authority`s board directed staff to submit the license application to the Texas Water Commission (the new Texas radiation control agency). The license application was submitted on March 2, 1992, and on April 15, 1992, the Commission determined that the application was sufficiently complete to begin review. Discrete technical packages such as groundwater hydrology, surface water hydrology, design, etc., will be submitted to the agency for review on the completion of each package. A schedule has been developed to allow the regulators the maximum time possible to review critical technical areas while minimizing the total review period.

  6. 40 CFR 272.2201 - Texas State-Administered Program: Final Authorization.

    Science.gov (United States)

    2010-07-01

    ... Recycling Act, sections 371.0025(b) and (c), 371.024(a), 371.024(c) and (d), 371.026(a) and (b), 371.028... title (relating to Purpose) * * * § 55.21 of this title (relating to Requests for Contested Case..., sections 361.131 through 140; Chapter 371, Texas Oil Collection, Management, and Recycling Act, sections...

  7. The Finnish final disposal programme proceeds to the site selection

    International Nuclear Information System (INIS)

    Seppaelae, T.

    1999-01-01

    Research for the selection of the final disposal site has been carried out already since the beginning of 1980's. Field studies were started in 1987: In the recent years, studied sites have included Olkiluoto in Eurajoki, Haestholmen in Loviisa, Romuvaara in Kuhmo and Kivetty in Aeaenekoski. Based on 40 years operation of four power plant units, the estimate for the accumulation of spent fuel to be disposed of in Finland is 2,600 tU. A 'Decision in Principle' is needed from the Finnish government to select the final disposal site, Posiva submitted the application for a policy decision in May 1999. The intended site of the facility is Olkiluoto which produces most of the spent fuel in Finland: A disposal would minimise the need of transports. In a poll among the inhabitants of Eurajoki, 60 per cent approved the final disposal facility. After a positive decision of the government, Posiva will construct an underground research facility in Olkiluoto. The construction of the final disposal facility will take place in the 2010's, the facility should be operational in 2020. (orig.) [de

  8. Long-term surveillance plan for the Falls City Disposal Site, Falls City, Texas. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The need for ground water monitoring at the Falls City disposal site was evaluated in accordance with NRC regulations and guidelines established by the DOE in Guidance for Implementing the Long-term Surveillance Program for UMTRA Project Title 1 Disposal Sites (DOE, 1996). Based on evaluation of site characterization data, it has been determined that a program to monitor ground water for demonstration of disposal cell performance based on a set of concentration limits is not appropriate because ground water in the uppermost aquifer is of limited use, and a narrative supplemental standard has been applied to the site that does not include numerical concentration limits or a point of compliance. The limited use designation is based on the fact that ground water in the uppermost aquifer is not currently or potentially a source of drinking water in the area because it contains widespread ambient contamination that cannot be cleaned up using methods reasonably employed by public water supply systems. Background ground water quality varies by orders of magnitude since the aquifer is in an area of redistribution of uranium mineralization derived from ore bodies. The DOE plans to perform post-closure ground water monitoring in the uppermost aquifer as a best management practice (BMP) as requested by the state of Texas.

  9. Long-term surveillance plan for the Falls City Disposal Site, Falls City, Texas. Revision 2

    International Nuclear Information System (INIS)

    1996-11-01

    The need for ground water monitoring at the Falls City disposal site was evaluated in accordance with NRC regulations and guidelines established by the DOE in Guidance for Implementing the Long-term Surveillance Program for UMTRA Project Title 1 Disposal Sites (DOE, 1996). Based on evaluation of site characterization data, it has been determined that a program to monitor ground water for demonstration of disposal cell performance based on a set of concentration limits is not appropriate because ground water in the uppermost aquifer is of limited use, and a narrative supplemental standard has been applied to the site that does not include numerical concentration limits or a point of compliance. The limited use designation is based on the fact that ground water in the uppermost aquifer is not currently or potentially a source of drinking water in the area because it contains widespread ambient contamination that cannot be cleaned up using methods reasonably employed by public water supply systems. Background ground water quality varies by orders of magnitude since the aquifer is in an area of redistribution of uranium mineralization derived from ore bodies. The DOE plans to perform post-closure ground water monitoring in the uppermost aquifer as a best management practice (BMP) as requested by the state of Texas

  10. Den site activity patterns of adult male and female swift foxes, Vulpes velox, in Northwestern Texas

    Science.gov (United States)

    Lemons, P.R.; Ballard, W.B.; Sullivan, R.M.; Sovada, M.A.

    2003-01-01

    Activity of Swift Foxes (Vulpes velox) at den sites was studied in northwestern Texas during pup rearing seasons in 2000 and 2001 to determine role of males in parental care. Twenty-four percent of radio-collared females with a potential to breed successfully raised pups to eight weeks of age. We intensively monitored presence and absence of male and female Swift Foxes at two den sites each year. Females were present >2.6 times more at den sites than males during the pup rearing season. Female and male Swift Foxes largely stayed at dens during diurnal hours and were active away from dens during nocturnal and crepuscular hours. Females and males spent 12.4% and 3.0% more time at dens before pups emerged, than after pups emerged, respectively. Following depredation of one male parent, the female spent 29% less time at the den site. Decrease in time spent at the den by the female following loss of her mate suggested that loss of one parent might severely impact recruitment of Swift Foxes. Our observations indicated that intense Coyote (Canis latrans) depredation may severely impact pup-rearing success as well as the parental care within Swift Fox family groups.

  11. Disbursement of $65 million to the State of Texas for construction of a Regional Medical Technology Center at the former Superconducting Super Collider Site, Waxahachie, Texas

    International Nuclear Information System (INIS)

    1995-05-01

    As part of a settlement agreement between the US DOE and the State of Texas, DOE proposes to transfer $65 million of federal funds to the Texas National Research Laboratory Commission (TNLRC) for construction of the Regional Medical Technology Center (RMTC) to be located in Ellis County, Texas. The RMTC would be a state-of-the-art medical facility for proton cancer therapy, operated by the State of Texas in conjunction with the University of Texas Southwestern Medical Center. The RMTC would use the linear accelerator assets of the recently terminated DOE Superconducting Super Collider Project to accelerate protons to high energies for the treatment of cancer patients. The current design provides for treatment areas, examination rooms, support laboratories, diagnostic imaging equipment, and office space as well as the accelerators (linac and synchrotron) and beam steering and shaping components. The potential environmental consequences of the proposed action are expected to be minor

  12. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Falls City, Texas: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This baseline risk assessment of ground water contamination of the uranium mill tailings site near Falls City, Texas, evaluates potential impact to public health and the environment resulting from ground water contamination at the former Susquehanna Western, Inc. (SWI), uranium mill processing site. This document fulfills the following objectives: determine if the site presents immediate or potential future health risks, determine the need for interim institutional controls, serve as a key input to project planning and prioritization, and recommend future data collection efforts to more fully characterize risk. The Uranium Mill Tailings Remedial Action (UMTRA) Project has begun its evaluation of ground water contamination at the Falls City site. This risk assessment is one of the first documents specific to this site for the Ground Water Project. The first step is to evaluate ground water data collected from monitor wells at or near the site. Evaluation of these data show the main contaminants in the Dilworth ground water are cadmium, cobalt, fluoride, iron, nickel, sulfate, and uranium. The data also show high levels of arsenic and manganese occur naturally in some areas.

  13. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Falls City, Texas: Revision 1

    International Nuclear Information System (INIS)

    1994-09-01

    This baseline risk assessment of ground water contamination of the uranium mill tailings site near Falls City, Texas, evaluates potential impact to public health and the environment resulting from ground water contamination at the former Susquehanna Western, Inc. (SWI), uranium mill processing site. This document fulfills the following objectives: determine if the site presents immediate or potential future health risks, determine the need for interim institutional controls, serve as a key input to project planning and prioritization, and recommend future data collection efforts to more fully characterize risk. The Uranium Mill Tailings Remedial Action (UMTRA) Project has begun its evaluation of ground water contamination at the Falls City site. This risk assessment is one of the first documents specific to this site for the Ground Water Project. The first step is to evaluate ground water data collected from monitor wells at or near the site. Evaluation of these data show the main contaminants in the Dilworth ground water are cadmium, cobalt, fluoride, iron, nickel, sulfate, and uranium. The data also show high levels of arsenic and manganese occur naturally in some areas

  14. Technical procedures for the implementation of cultural resource site studies, Deaf Smith County, Texas: Preliminary draft

    International Nuclear Information System (INIS)

    1987-01-01

    Cultural resources at the Deaf Smith County site will be identified, evaluated and managed through the implementation of studies detailed in the Site Study Plan for Cultural Resources. This technical procedure outlines the conduct of pedestrian survey and the documentation of identified cultural resources. The purpose of the field surveys is to identify and document cultural resources in the areas that will be affected by site characterization activities and to record the environmental setting of identified cultural resources. Three pedestrian surveys will cover 100 percent of the on-site and off-site project areas. Survey 1 will provide coverage of the Repository Surface Facility (RSF) area, which includes the Exploratory Shaft Facility (ESF) and two linear engineering design borehole (EDBH) seismic survey corridors. Survey 2 will provide coverage of a 39 km 2 (15 mi 2 ) area that includes the 23 km 2 (9 mi 2 ) Deaf Smith County site plus a 0.4 to 0.8 kM (1/4 to 1/2 mi) border area but excludes the area covered by Survey 1. Survey 3 will cover offsite geotechnical test areas, such as the locations of playa boreholes, deep playa wells, hydrologic tests, site foundation borings, and their access routes. The purpose of site documentation or recording is to address the project information needs for land use permits and approvals, engineering design support, and cultural resource evaluation for National Register of Historic Places eligibility. Site documentation will consist of gathering sufficient data on identified resources to complete Texas Natural Resource Information System (TNRIS). 7 refs., 3 figs

  15. Public health assessment for Geneva Industries/Fuhrmann Energy, Houston, Harris County, Texas, Region 6. CERCLIS No. TXD980748453. Addendum. Final report

    International Nuclear Information System (INIS)

    1993-01-01

    The Geneva Industries Site is an abandoned refinery in Houston, Texas, that manufactured polychlorinated biphenyls (PCBs). Although there is evidence of past exposure to site contaminants, the site currently poses no apparent public health hazard. The contaminants to which persons may have been exposed in the past include polychlorinated biphenyls (PCBs), polycyclic aromatic hydrocarbons (PAHs), and 2,3,7,8-tetrachlorodibenzo-p-dioxin (TCDD). The lack of historical ambient air data from the time when the site was active prevents us from evaluating the potential for adverse health effects from inhalation exposure. Although fish and crawfish taken from the local drainageways were contaminated with PCBs, it is unlikely that humans would have been exposed to these species through the food chain. The groundwater under the site is contaminated. Although the contaminated water is not currently being used for human consumption, there is a potential for exposure to contaminated groundwater in the future. Planned groundwater remedial actions should eliminate this threat

  16. 78 FR 53426 - Expansion of Foreign-Trade Zone 84; Houston, Texas

    Science.gov (United States)

    2013-08-29

    ... 84; Houston, Texas Pursuant to its authority under the Foreign-Trade Zones Act of June 18, 1934, as..., the Port of Houston Authority, grantee of Foreign-Trade Zone 84, submitted an application to the Board for authority to expand FTZ 84 to include a site in Brazos County, Texas, adjacent to the Houston...

  17. Final vegetative cover for closed waste sites

    International Nuclear Information System (INIS)

    Cook, J.R.; Salvo, S.K.

    1993-01-01

    Low-level, hazardous, and mixed waste disposal sites normally require some form of plant material to prevent erosion of the final closure cap. Waste disposal sites are closed and capped in a complex scientific manner to minimize water infiltration and percolation into and through the waste material. Turf type grasses are currently being used as an interim vegetative cover for most sites. This coverage allows for required monitoring of the closure cap for settlement and maintenance activities. The purpose of this five year study was to evaluate plant materials for use on wastes sites after the post-closure care period that are quickly and easily established and economically maintained, retard water infiltration, provide maximum year-round evapotranspiration, are ecologically acceptable and do not harm the closure cap. The results of the study suggest that two species of bamboo (Phyllostachys (P.) bissetii and P. rubromarginata) can be utilized to provide long lived, low maintenance, climax vegetation for the waste sites after surveillance and maintenance requirements have ceased

  18. Summary of the Phase II, Title I engineering assessment of inactive uranium mill tailings, Falls City Site, Falls City, Texas

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at Falls City, Texas. Services included taking soil samples, the performance of radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 2.5 million tons of tailings at the Falls City site constitutes the most significant environmental impact. Windblown tailings, external gamma radiation and localized contamination of surface waters are other environmental effects. The two alternative remedial action options presented include on-site and off-site cleanup, fencing, and hydrological monitoring and, in addition, stabilization of pile 2 with 2 ft of cover material. The costs are $1.84 million and $2.45 million

  19. Hazardous waste incinerator permitting in Texas from inception to operation

    International Nuclear Information System (INIS)

    Simms, M.D.; McDonnell, R.G. III

    1991-01-01

    The regulatory permitting process for hazardous waste incinerators i a long and arduous proposition requiring a well-developed overall strategy. In Texas, RCRA permits for the operation of hazardous waste incinerator facilities are issued through the federally delegated Texas Water Commission (TWC). While the TWC has primacy in the issuance of RCRA permits for hazardous waste incinerators, the Texas Air Control Board (TACB) provides a significant portion of the Part B application review and provides much of the permit language. In addition to dealing with regulatory agencies, RCRA permitting provides by significant public involvement. Often the lack of public support becomes a major roadblock for an incinerator project. In order to establish an effective strategy which addresses the concerns of regulatory agencies and the public, it is important to have an understanding of the steps involved in obtaining a permit. A permit applicant seeking to construct a new hazardous waste incinerator can expect to go through a preapplication meeting with government regulators, a site selection process, file an application, respond to calls for additional technical information from both the TACB and the TWC, defend the application in a hearing, have a recommendation from a TWC hearing examiner and, finally, receive a determination from the TWC's Commissioners. Presuming a favorable response from the Commission, the permittee will be granted a trial burn permit and may proceed with the construction, certification and execution of a trial burn at the facility. Subsequent to publication of the trial burn results and approval by the TWC, the permittee will possess an operational hazardous waste incinerator permit. The paper describes the major steps required to receive an operational permit for a hazardous waste incinerator in the State of Texas. Important issues involved in each step will be discussed including insights gained from recent incinerator permitting efforts

  20. UMTRA project water sampling and analysis plan, Falls City, Texas. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas, are described in this water sampling and analysis plan (WSAP). The following plan identifies and justifies the sampling locations, analytical parameters, and sampling frequency for the routine monitoring stations at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. The Falls City site is in Karnes County, Texas, approximately 8 miles [13 kilometers southwest of the town of Falls City and 46 mi (74 km) southeast of San Antonio, Texas. Before surface remedial action, the tailings site consisted of two parcels. Parcel A consisted of the mill site, one mill building, five tailings piles, and one tailings pond south of Farm-to-Market (FM) Road 1344 and west of FM 791. A sixth tailings pile designated Parcel B was north of FM 791 and east of FM 1344

  1. Site study plan for intermediate hydrology clusters tests wells Deaf Smith County Site, Texas

    International Nuclear Information System (INIS)

    1988-01-01

    To characterize the geologic, geochemical, and hydrologic characteristics of intermediate-depth formations at the proposed Deaf Smith County, Texas, repository site, wells called Intermediate Hydrology clusters will test the Dewey Lake, Alibates, Salado, Yates, Upper and Lower Seven Rivers, and Queen Grayburg Formations. Sixteen wells will be installed at six locations. One location will have four wills, two locations will have three wells, and three locations will have two wells for a total of 16 wells. Testing of the formations is to proceed from the bottom up, with 2-day pumping tests at the less permeable formations. Tracer tests and tests for verticall hydraulic properties will be designed and performed after other hydrologic tests are completed. After testing, selected wells are to be completed as single or possibly dual monitoring wells to observe water-level trends. To develop a hydrogeologic testing plan, the response of each formation to potential testing procedures was evaluated using design values and an assumend range for hydraulic parameters. These evaluations indicate that hydraulic properties of a sandy zone of the Dockum, the lower Sever Rivers, and possibly the Alibates and Queen/Grayburg can be determined by pumping tests. Standard of shut-in slug tests must be conducted in the remaining formations. Tests of very long duration would be required to determine the verticla properties of less permeable formations. Tracer tests would also require weeks or months. 61 figs., 34 refs., 4 tabs

  2. Evaluation of brine disposal from the Bryan Mound site of the strategic petroleum reserve program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Case, Robert J.; Chittenden, Jr, Mark E.; Harper, Jr, Donald E.; Kelly, Jr, Francis J.; Loeblich, Laurel A.; McKinney, Larry D.; Minello, Thomas J.; Park, E. Taisoo; Randall, Robert E.; Slowey, J. Frank

    1981-01-01

    On March 10, 1980, the Department of Energy's Strategic Petroleum Reserve Program began leaching the Bryan Mound salt dome and discharging the resulting brine into the coastal waters off Freeport, Texas. During the months of March and April, a team of scientists and engineers from Texas A and M University conducted an intensive environmental study of the area surrounding the diffuser site. A pipeline has been laid from the Bryan Mound site to a location 12.5 statute miles (20 km) offshore. The last 3060 ft (933 m) of this pipeline is a 52-port diffuser through which brine can be discharged at a maximum rate of 680,000 barrels per day. Initially, 16 ports were open which permitted a maximum discharge rate of 350,000 barrels per day and a continuous brine discharge was achieved on March 13, 1980. The purpose of this report is to describe the findings of the project team during the intensive postdisposal study period of March and April, 1980. The major areas of investigation are physical oceanography, analysis of the discharge plume, water and sediment quality, nekton, benthos, phytoplankton, zooplankton, and data management.

  3. Project Rio Blanco: site restoration. Final report

    International Nuclear Information System (INIS)

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  4. Texas Affordable Baccalaureate Program: A Collaboration between the Texas Higher Education Coordinating Board, South Texas College, and Texas A&M University-Commerce. CBE Case Study

    Science.gov (United States)

    Klein-Collins, Rebecca; Glancey, Kathleen

    2015-01-01

    This case study is part of a series on newer competency-based degree programs that have been emerging in recent years. In January 2014, the Texas Higher Education Coordinating Board (THECB), South Texas College (STC), and Texas A&M University-Commerce (A&M Commerce) launched the Texas Affordable Baccalaureate Program, the state's first…

  5. Study of neutron focusing at the Texas Cold Neutron Source. Final report

    International Nuclear Information System (INIS)

    Wehring, B.W.; Uenlue, K.

    1995-01-01

    Funds were received for the first year of a three year DOE Nuclear Engineering Research Grant, ''Study of Neutron Focusing at the Texas Cold Neutron Source'' (FGO2-92ER75711). The purpose of this three year study was to develop a neutron focusing system to be used with the Texas Cold Neutron Source (TCNS) to produce an intense beam of neutrons. A prompt gamma activation analysis (PGAA) facility was also to be designed, setup, and tested under the three year project. During the first year of the DOE grant, a new procedure was developed and used to design a focusing converging guide consisting of truncated rectangular cone sections. Detailed calculations were performed using a 3-D Monte Carlo code which we wrote to trace neutrons through the curved guide of the TCNS into the proposed converging guide. Using realistic reflectivities for Ni-Ti supermirrors, we obtained gains of 3 to 5 for the neutron flux averaged over an area of 1 x 1 cm

  6. Well-Integrity Survey (Phase II) of Abandoned Homestead Water Wells in the High Plains Aquifer, Former Pantex Ordnance Plant and Texas Tech Research Farm Near Amarillo, Texas, 1995

    National Research Council Canada - National Science Library

    Rivers, Glenn A

    1995-01-01

    This report describes the methods used and the results obtained during a field search for abandoned homestead sites and water wells at the former Pantex Ordnance Plant and Texas Tech Research Farm (Pantex site...

  7. Analysis of hydraulic gradients across the host rock at the proposed Texas Panhandle nuclear-waste repository site

    International Nuclear Information System (INIS)

    Bair, E.S.

    1987-01-01

    Analysis of the direction of ground-water flow across the host rock at the proposed high-level nuclear-waste repository site in Deaf Smith County, Texas, is complicated by vertical and lateral changes in the density of formation fluids in the various hydrogeologic units that overlie and underlie the proposed host rock. Because the concept of hydraulic head is not valid when evaluating vertical hydraulic gradients in a variably-density flow system, other methods were used to determine the direction and magnitude of vertical hydraulic gradients at the proposed site where the specific gravity of formation fluids varies between 1.00 and 1.28. The direction of ground-water flow across the proposed host rock, an 80-foot-thick salt bed in the Lower San Andres Formation, was determined by calculating vertical hydraulic gradients based on formation pressure and fluid density data, and by analysis of pressure-depth diagrams. Based on data from the vicinity of the proposed site, both methods indicate the potential for downflow across the host rock. Downflow or predominantly horizontal flow is considered a favorable prewaste emplacement condition because it prolongs the travel time to the biosphere of any naturally or accidentally released radionuclides

  8. Technical procedures for ecology: Environmental field program, Deaf Smith County Site, Texas: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    This volume contains Technical Procedures pursuant to the Land Use Site Study Plan including walkover surveys for threatened, endangered, or candidate species; vegetation classification and mapping; reclamation planning; wetland and floodplain determination and characterization of playas; wildlife habitat mapping methods; mammal sampling; bird survey methods; reptile and amphibian survey methods; preexisting environmental; stress and disturbance studies methods; voucher specimens for plants; and voucher specimens to wildlife. 9 refs., 5 figs., 1 tab

  9. Role of the Texas transportation system in attracting and retaining business : final report.

    Science.gov (United States)

    2017-05-01

    Texas should remain vigilant and aggressive as it strategizes about how to use transportation as a means to stimulate economic growth. This can be done by designing the transportation network to prioritize connectivity to, from, and between hubs of e...

  10. High energy physics program at Texas A and M University. Final report, April 1, 1995 - March 31, 1996

    International Nuclear Information System (INIS)

    1995-12-01

    The experimental and theoretical high energy physics programs at Texas A ampersand M University have continued their vigorous research activities over the past year. This is the final report on activities which have been supported through DOE grant DE-FG05-91ER40633. This report covers the period January 1, 1995 to December 31, 1995. The project includes a component which has used the Fermilab Tevatron, as part of the Collider Detector (CDF) collaboration. They have been involved in operations and theory work on supersymmetry (SUSY). Another component works with the MACRO experiment at the Gran Sasso Laboratory in l'Aquila, Italy, to study magnetic monopoles, astrophysical neutrinos, and cosmic ray phenomena. A third effort has been involved in developing an Expression of Interest and a Fermilab proposal for a large fine-grained magnetic sampling detector to be used for studying events inducted by accelerator or atmospheric neutrinos as a way to search for neutrino oscillations (MINOS). Finally the theoretical effort has addressed string theory, model building, SUSY phenomenology, astroparticle physics, and brain function and quantum mechanics

  11. Iguana bites reported to Texas poison centers.

    Science.gov (United States)

    Forrester, Mathias B

    2010-09-01

    Although thousands of iguanas are kept as pets in the United States, information on their bites is limited. The intent of this investigation was to describe the pattern of iguana bites reported to Texas poison centers. Iguana bites reported during 1998-2008 were identified. The distribution of cases by various factors was determined. Of 59 total bites, 71% were managed on-site, 17% of the patients were at or en route to a health care facility when the poison center was contacted, and 10% were referred to a health care facility. The medical outcome was no effect in 9% of the cases, minor effect in 24%, moderate effect in 2%, not followed but minimal effects possible in 64%, and unable to follow but potentially toxic in 2%. Most iguana bites reported to Texas poison centers did not result in serious effects and were managed on-site. Copyright © 2010 Elsevier Inc. All rights reserved.

  12. Potential development of an intercity passenger transit system in Texas : final project report.

    Science.gov (United States)

    2010-05-01

    This report describes the findings of a research study of the potential for development of an intercity rail and : express bus system in the state of Texas. Rather than focus on regional commuter or light rail systems : radiating from urban areas, th...

  13. Hurricane Rita Aerial Photography: High-Resolution Imagery of the Texas and Louisiana Gulf Coast After Landfall

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The imagery posted on this site is of the Texas and Louisiana Gulf Coast after Hurricane Rita made landfall. The regions photographed range from San Luis Pass, Texas...

  14. Technical procedures for land use, Deaf Smith County site, Texas: Environmental Field Program: Final draft

    International Nuclear Information System (INIS)

    1987-09-01

    This volume contains Technical Procedures pursuant to the Land Use Site Study Plan including land use data acquisition, land use/land cover map compilation, verification of land use/land cover map accuracy, and land use/land cover data analysis. 22 refs., 5 figs

  15. Bulletin of the Texas Archeological Society, Volume 71 (2000, Austin, Paper.

    Directory of Open Access Journals (Sweden)

    Larry D. Banks

    2000-11-01

    Full Text Available This annual bulletin of the Texas Archeological Society is a unique contribution specifically focused upon the history of Texas archaeology in a format that no others have done previously. The volume contains 150 pages, the majority of which consists of interviews (146 pages conducted by the first State Archaeologist of Texas, Curtis Tunnell. In 1968 Tunnell conceived of the idea of obtaining personal interviews from individuals whom he considered his heroes for their pioneering efforts in Texas archeology. This volume entails the first publication of such information, but more will certainly follow. The remaining four pages comprise two different reviews of other publications important in their own right to those interested in Southern Plains archeology of Texas. These two reviews by Timothy K Pertulla and David T. Hughes, respectively, are of The Coronado Expedition to Tierra Nueva: The 1540·1542 Route Across the Southwest by Richard Flint and Shirley Cushing flint, and GaffCreek: Artifact Collection Strategy and Occupation Prehistory on the Southern High Plains, Texas County. Oklahoma. The section by Tunnell titled "In Their Own Words: Stories from Some Pioneer Texas Archeologists" contains numerous previously unpublished photographs of people, sites and artifacts referred to the texts.

  16. Northeast Oregon Hatchery Project, Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  17. Tiger Team Assessment of the Pantex Plant, Amarillo, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1990-02-01

    This document contains the findings and associated root causes identified during the Tiger Team Assessment of the Department of Energy's (DOE) Pantex Plant in Amarillo, Texas. This assessment was conducted by the Department's Office of Environment, Safety and Health between October 2 and 31, 1989. The scope of the assessment of the Pantex Plant covered all areas of environment, safety and health (ES H) activities, including compliance with federal, state, and local regulations, requirements, permits, agreements, orders and consent decrees, and DOE ES H Orders. The assessment also included an evaluation of the adequacy of DOE and site contractor ES H management programs. The draft findings were submitted to the Office of Defense Programs, the Albuquerque Operations Office, the Amarillo Area Office, and regulatory agencies at the conclusion of the on-site assessment activities for review and comment on technical accuracy. Final modifications and any other appropriate changes have been incorporated in the final report. The Tiger Team Assessment of the Pantex Plant is part of the larger Tiger Team Assessment program which will encompass over 100 DOE operating facilities. The assessment program is part of a 10-point initiative announced by Secretary of Energy James D. Watkins on June 27, 1989, to strengthen environmental protection and waste management activities in the Department. The results of the program will provide the Secretary with information on the compliance status of DOE facilities with regard to ES H requirements, root causes for noncompliance, adequacy of DOE and site contractor ES H management programs, and DOE-wide ES H compliance trends.

  18. Texas Bull Nettle (Cnidoscolus texanus) Exposures Reported to Texas Poison Centers.

    Science.gov (United States)

    Forrester, Mathias B

    2017-06-01

    Texas bull nettle (Cnidoscolus texanus) is covered in bristly hairs similar to stinging nettle. Contact with the plant may result in intense dermal pain, burning, itching, cellulitis, and allergic reaction. This study characterizes C texanus exposures reported to a large state-wide poison center system. Cases were C texanus exposures reported to Texas poison centers during 2000-2015. The distribution of cases was determined for patient demographics, exposure circumstances, and patient outcome. A total of 140 C texanus exposures were identified. Twenty percent of the patients were aged ≤5 years, 21% were 6 to 12 years, 5% were 13 to 19 years, and 51% were ≥20years; and 51% of the patients were male. Eighty-one percent of the exposures occurred at the patient's own residence, 11% in a public area, 2% at another residence, and 1% at school. Seventy-eight percent of the patients were managed on site, 13% were already at or en route to a health care facility, and 6% were referred to a health care facility. Eighty-eight percent of the exposures resulted in dermal effects: irritation or pain (56%), erythema or flushing (31%), edema (27%), pruritus (24%), rash (19%), puncture or wound (19%), and hives or welts (11%). C texanus exposures reported to Texas poison centers were most likely to be unintentional and occur at the patient's own residence. The outcomes of the exposures tended not to be serious and could be managed successfully outside of health care facilities. Copyright © 2017 Wilderness Medical Society. Published by Elsevier Inc. All rights reserved.

  19. Remote Sensing Analysis of the Sierra Blanca (Faskin Ranch) Low-Level Radioactive Waste Disposal Site, Hudspeth County, Texas

    International Nuclear Information System (INIS)

    LeMone, D. V.; Dodge, R.; Xie, H.; Langford, R. P.; Keller, G. R.

    2002-01-01

    Remote sensing images provide useful physical information, revealing such features as geological structure, vegetation, drainage patterns, and variations in consolidated and unconsolidated lithologies. That technology has been applied to the failed Sierra Blanca (Faskin Ranch) shallow burial low-level radioactive waste disposal site selected by the Texas Low-Level Radioactive Waste Disposal Authority. It has been re-examined using data from LANDSAT satellite series. The comparison of the earlier LANDSAT V (5/20/86) (30-m resolution) with the later new, higher resolution ETM imagery (10/23/99) LANDSAT VII data (15-m resolution) clearly shows the superiority of the LANDSAT VII data. The search for surficial indications of evidence of fatal flaws at the Sierra Blanca site utilizing was not successful, as it had been in the case of the earlier remote sensing analysis of the failed Fort Hancock site utilizing LANDSAT V data. The authors conclude that the tectonic activity at the Sierra Blanca site is much less recent and active than in the previously studied Fort Hancock site. The Sierra Blanca site failed primarily on the further needed documentation concerning a subsurface fault underneath the site and environmental justice issues. The presence of this fault was not revealed using the newer LANDSAT VII data. Despite this fact, it must be remembered that remote sensing provides baseline documentation for determining future physical and financial remediation responsibilities. On the basis of the two sites examined by LANDSAT remote sensing imaging, it is concluded that it is an essential, cost-effective tool that should be utilized not only in site examination but also in all nuclear-related facilities

  20. Site Study Plan for salt, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Salt Site Study Plan (SSP) describes a program for characterizing the existing salt environment in the site vicinity. A step-by-step approach is described which proceeds from published data and planned theoretical studies, to planned laboratory studies, and finally to planned field studies, to provide the necessary data to meet program requirements contained in the Salt Repository Project - Requirements Document (SRP-RD). The plan also draws on the results of other SSP's for certain data; for example, soil salinity data are to be provided under the Soils SSP. The salt studies consist of evaluation of control and mitigation measures, salt monitoring studies, emission factors development, air models development and validation, and risk assessment. For each study, its design and design rationale; analysis, management, and use of data; schedule of activities; organization of personnel and sample management; and quality assurance requirements are described. 90 refs., 9 figs., 7 tabs

  1. Summary of the engineering assessment of inactive uranium mill tailings: Falls City site, Falls City, Texas

    International Nuclear Information System (INIS)

    1981-10-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Falls City site in order to update the December 1977 engineering assessment of the problems resulting from the existence of radioactive uranum mill tailings at Falls City, Texas. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrolgy and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 2.5 million tons of tailings at the Falls City site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material, to removal of the tailings to remote disposal sites and decontamination of the tailings site. Cost estimates for the four options range from about $21,700,000 for stabilization in place, to about $35,100,000 for disposal at a distance of about 15 mi. Three principal alternatives for the reprocessing of the Falls City tailings were examined: heap leaching; treatment at an existing mill; reprocessing at a new conventional mill constructed for tailings reprocessing. The tailings piles are presently being rewashed for uranium recovery by Solution Engineering, Inc. The cost for further reprocessing would be about $250/lb of U 3 O 8 . The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery does not appear to be economically attractive for the foreseeable future

  2. Operation of South Texas Project, Units 1 and 2 Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et.al., Matagorda County, Texas

    International Nuclear Information System (INIS)

    1986-08-01

    The final environmental impact statement (EPA No. 860376F) on a proposal to issue operating licenses for units 1 and 2 of the South Texas Project describes the two pressurized waters reactors that will produce 1250 MWe per unit. A closed-cycle will use water from the Colorado River for cooling. The site will include prime farmland. The study finds no significant effect on aquatic productivity of the river and no disruptions of the terrestrial biota. Economic benefits will include about 1800 new jobs, which will raise tax revenues and spur the local economy. Area marsh lands and wildlife habitat will suffer. The risk of exposure to accidental radiation is considered very low. The Federal Water Pollution Control Act of 1972 and Nuclear Regulatory Commission Licensing require the impact study

  3. Health-hazard evaluation report HETA 86-456-1877, South Texas Nuclear Project, Wadsworth, Texas

    International Nuclear Information System (INIS)

    Sinks, T.H.; Hartle, R.W.

    1988-03-01

    An evaluation was made of an outbreak of dermatitis among workers at the South Texas Nuclear Project construction site, Wadsworth, Texas. The dermatitis occurred ten times more frequently among carpenters than other laborers, with the incidence in 1986 being 250% greater than it was in 1985. Some workers demonstrated pruritic, macular/papular lesions. Carpenters working on the inside of the power-project buildings had a higher incidence of skin disease than those employed on the outside of the buildings. Samples of plywood and lumber treated with fire-retardant indicated that they contained 3 and 5% phosphate, respectively. Arsenic was not detected but formaldehyde was detected at 59 parts per million. General environmental air samples were taken with no evidence found of airborne phosphate, melamine, dicyandiamide, or formaldehyde. Concentrations of total particulates ranged from 0.1 to 0.6mg/m 3 . The authors conclude that the workers were probably suffering from a contact dermatitis. The authors recommend specific precautions

  4. Site-selection studies for final disposal of spent fuel in Finland

    International Nuclear Information System (INIS)

    Vuorela, P.; Aeikaes, T.

    1984-02-01

    In the management of waste by the Industrial Power Company Ltd. (TVO) preparations are being made for the final disposal of unprocessed spent fuel into the Finnish bedrock. The site selection program will advance in three phases. The final disposal site must be made at the latest by the end of the year 2000, in accordance with a decision laid down by the Finnish Government. In the first phase, 1983-85, the main object is to find homogeneous stable bedrock blocks surrounded by fracture zones located at a safe distance from the planned disposal area. The work usually starts with a regional structural analysis of mosaics of Landsat-1 winter and summer imagery. Next an assortment of different maps, which cover the whole country, is used. Technical methods for geological and hydrogeological site investigations are being developed during the very first phase of the studies, and a borehole 1000 meters deep will be made in southwestern Finland. Studies for the final disposal of spent fuel or high-level reprocessing waste have been made since 1974 in Finland. General suitability studies of the bedrock have been going on since 1977. The present results indicate that suitable investigation areas for the final disposal of highly active waste can be found in Finland

  5. Treasured Texas Theaters

    Science.gov (United States)

    Horton, Anita

    2012-01-01

    Dallas artist Jon Flaming's deep love of Texas is evident in his paintings and sculpture. Although he has created one sculptural Texas theater, his work primarily showcases old Texas barbershops, vacant homes, and gas stations. In this article, the author describes how her students, inspired by Flaming's works, created three-dimensional historical…

  6. Can Texas' Physicians Be as Diverse as Texas?

    Science.gov (United States)

    Price, Sean

    2017-07-01

    The United States and Texas have a chronic shortage of doctors, but the shortage of minority physicians is even more acute. To address this, and the health disparities that come with it, Texas medical schools are working to increase minority enrollment, but challenges remain.

  7. How the University of Texas system responded to the need for interim storage of low-level radioactive waste materials.

    Science.gov (United States)

    Emery, Robert J

    2012-11-01

    Faced with the prospect of being unable to permanently dispose of low-level radioactive wastes (LLRW) generated from teaching, research, and patient care activities, component institutions of the University of Texas System worked collaboratively to create a dedicated interim storage facility to be used until a permanent disposal facility became available. Located in a remote section of West Texas, the University of Texas System Interim Storage Facility (UTSISF) was licensed and put into operation in 1993, and since then has provided safe and secure interim storage for up to 350 drums of dry solid LLRW at any given time. Interim storage capability provided needed relief to component institutions, whose on-site waste facilities could have possibly become overburdened. Experiences gained from the licensing and operation of the site are described, and as a new permanent LLRW disposal facility emerges in Texas, a potential new role for the storage facility as a surge capacity storage site in times of natural disasters and emergencies is also discussed.

  8. Called to Teach: Percy and Anna Pennybacker's Contributions to Education in Texas, 1880-1899

    Science.gov (United States)

    King, Kelley M.

    2012-01-01

    In 1879, with aid from the Peabody fund, Texas's first tax-supported teacher training institution, Sam Houston State Normal Institute (SHNI), opened on the site of the old Austin College in Huntsville (Richmond 1941, 37). The need for qualified educators in Texas was growing as the state struggled to make up for decades of neglect of and antipathy…

  9. Rural southeast Texas air quality measurements during the 2006 Texas Air Quality Study.

    Science.gov (United States)

    Schade, Gunnar W; Khan, Siraj; Park, Changhyoun; Boedeker, Ian

    2011-10-01

    The authors conducted air quality measurements of the criteria pollutants carbon monoxide, nitrogen oxides, and ozone together with meteorological measurements at a park site southeast of College Station, TX, during the 2006 Texas Air Quality Study II (TexAQS). Ozone, a primary focus of the measurements, was above 80 ppb during 3 days and above 75 ppb during additional 8 days in summer 2006, suggestive of possible violations of the ozone National Ambient Air Quality Standard (NAAQS) in this area. In concordance with other air quality measurements during the TexAQS II, elevated ozone mixing ratios coincided with northerly flows during days after cold front passages. Ozone background during these days was as high as 80 ppb, whereas southerly air flows generally provided for an ozone background lower than 40 ppb. Back trajectory analysis shows that local ozone mixing ratios can also be strongly affected by the Houston urban pollution plume, leading to late afternoon ozone increases of as high as 50 ppb above background under favorable transport conditions. The trajectory analysis also shows that ozone background increases steadily the longer a southern air mass resides over Texas after entering from the Gulf of Mexico. In light of these and other TexAQS findings, it appears that ozone air quality is affected throughout east Texas by both long-range and regional ozone transport, and that improvements therefore will require at least a regionally oriented instead of the current locally oriented ozone precursor reduction policies.

  10. Environmental assessment, Deaf Smith County site, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1986-05-01

    The Nuclear Waste Policy Act of 1982 (42 USC sections 10101-10226) requires the environmental assessment of a proposed site to include a statement of the basis for nominating a site as suitable for characterization. Volume 2 provides a detailed statement evaluating the site suitability of the Deaf Smith County Site under DOE siting guidelines, as well as a comparison of the Deaf Smith County Site to the other sites under consideration. The evaluation of the Deaf Smith County Site is based on the impacts associated with the reference repository design, but the evaluation will not change if based on the Mission Plan repository concept. The second part of this document compares the Deaf Smith County Site to Davis Canyon, Hanford, Richton Dome and Yucca Mountain. This comparison is required under DOE guidelines and is not intended to directly support subsequent recommendation of three sites for characterization as candidate sites. 259 refs., 29 figs., 66 refs. (MHB)

  11. Environmental assessment, Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    1986-05-01

    The Nuclear Waste Policy Act of 1982 (42 USC sections 10101-10226) requires the environmental assessment of a proposed site to include a statement of the basis for nominating a site as suitable for characterization. Volume 2 provides a detailed statement evaluating the site suitability of the Deaf Smith County Site under DOE siting guidelines, as well as a comparison of the Deaf Smith County Site to the other sites under consideration. The evaluation of the Deaf Smith County Site is based on the impacts associated with the reference repository design, but the evaluation will not change if based on the Mission Plan repository concept. The second part of this document compares the Deaf Smith County Site to Davis Canyon, Hanford, Richton Dome and Yucca Mountain. This comparison is required under DOE guidelines and is not intended to directly support subsequent recommendation of three sites for characterization as candidate sites. 259 refs., 29 figs., 66 refs

  12. Technical procedures for water resources: Volume 3, Environmental Field Program, Deaf Smith County Site, Texas: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    To ensure that the environmental field program comprehensively addresses the issues and requirements of the project, a site study plan (SSP) has been prepared for Water Resources (ONWI, 1987). This technical procedure (TP) has been developed to implement the field program described in the Water Resources Site Study Plan. This procedure provides the general method for the field collection of water and sediment samples from playa lakes using an Alpha horizontal type sampler or equivalent or a peristaltic pump for water and a KB-coring devise or ponar grab for sediments. The samples will be preserved and then shipped to a laboratory for analysis. The water quality and sediment samples will be collected as part of the surface-water quality field study described in the Site Plan for Water Resources. 15 refs., 5 figs., 3 tabs

  13. Muleshoe Virus and Other Hantaviruses Associated with Neotomine or Sigmodontine Rodents in Texas.

    Science.gov (United States)

    Milazzo, Mary Louise; Cajimat, Maria N B; Richter, Martin H; Bradley, Robert D; Fulhorst, Charles F

    2017-10-01

    The broad objective of this study was to increase our knowledge of Muleshoe virus and other hantaviruses associated with cricetid rodents in Texas. Anti-hantavirus antibody was found in 38 (3.2%) of 1171 neotomine rodents and 6 (1.8%) of 332 sigmodontine rodents from 10 Texas counties; hantaviral RNA was detected in 23 (71.9%) of 32 antibody-positive rodents. Analyses of nucleocapsid protein gene sequences indicated Muleshoe virus infection in four hispid cotton rats (Sigmodon hispidus) from northern Texas; Bayou virus, three Texas marsh oryzomys (Oryzomys texensis) from the Gulf Coast; Limestone Canyon virus, five brush mice (Peromyscus boylii) from western Texas; and Sin Nombre virus-five Texas mice (P. attwateri), one Lacey's white-ankled deer mouse (P. laceianus), four white-footed mice (P. leucopus), and one fulvous harvest mouse (Reithrodontomys fulvescens) from northern, central, or southern Texas. The results of this study together with the results of a previous study revealed that Muleshoe virus, perhaps in association with S. hispidus, is distributed across northern Texas. Finally, the results of Bayesian analyses of glycoprotein precursor (GPC) gene sequences and pairwise comparisons of complete GPC (amino acid) sequences strengthened support for the notion that Muleshoe virus is distinct from Black Creek Canal virus, Bayou virus, and all other species included in the Bunyaviridae, genus Hantavirus.

  14. Furthering Medical Education in Texas.

    Science.gov (United States)

    Varma, Surendra K; Jennings, John

    2016-02-01

    Medical education in Texas is moving in the right direction. The Texas Medical Association has been a major partner in advancing medical education initiatives. This special symposium issue on medical education examines residency training costs, the Next Accreditation System, graduate medical education in rural Texas, Texas' physician workforce needs, the current state of education reform, and efforts to retain medical graduates in Texas.

  15. Technical procedures for water resources, Deaf Smith County site, Texas: Volume 2: Environmental Field Program: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    This volume contains the following Technical Procedures pursuant to the Water Resources Site Study Plan operation of a Playa Lake conductivity monitoring station and processing of data from a Playa Lake conductivity monitoring station. This procedure defines steps and methods for the installation, operation, and maintenance of the Playa Lake conductivity monitoring stations. Conductivity measurements will be taken at six playa lakes in the site study area to record changes in total dissolved solids as a function of stage. Playa lake conductivity and stage (volume) measurements will be used, in conjunction with other water quality data collected at the Playa Lake and precipitation stations, to determine the mass of dissolved solids entering and leaving the playas. This baseline information on the pollutant mass balance of the playas will be used to assess potential changes in playa lake water quality and the magnitude of those changes due to site development. The pollutant mass balances will also be used on determining the source of pollutants. 2 refs., 5 figs

  16. Texas motorcycle crash countermeasure workshop.

    Science.gov (United States)

    2013-06-01

    The Texas Department of Transportation (TxDOT) contracted with the Texas A&M : Transportation Institute (TTI) to develop a 5-year strategic plan for improving motorcycle safety : in the State of Texas. The Texas Strategic Action Plan for Motorcycl...

  17. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723). DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  18. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume1

    Energy Technology Data Exchange (ETDEWEB)

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723).DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations:Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho;Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  19. Floods in Central Texas, September 7-14, 2010

    Science.gov (United States)

    Winters, Karl E.

    2012-01-01

    Severe flooding occurred near the Austin metropolitan area in central Texas September 7–14, 2010, because of heavy rainfall associated with Tropical Storm Hermine. The U.S. Geological Survey, in cooperation with the Upper Brushy Creek Water Control and Improvement District, determined rainfall amounts and annual exceedance probabilities for rainfall resulting in flooding in Bell, Williamson, and Travis counties in central Texas during September 2010. We documented peak streamflows and the annual exceedance probabilities for peak streamflows recorded at several streamflow-gaging stations in the study area. The 24-hour rainfall total exceeded 12 inches at some locations, with one report of 14.57 inches at Lake Georgetown. Rainfall probabilities were estimated using previously published depth-duration frequency maps for Texas. At 4 sites in Williamson County, the 24-hour rainfall had an annual exceedance probability of 0.002. Streamflow measurement data and flood-peak data from U.S. Geological Survey surface-water monitoring stations (streamflow and reservoir gaging stations) are presented, along with a comparison of September 2010 flood peaks to previous known maximums in the periods of record. Annual exceedance probabilities for peak streamflow were computed for 20 streamflow-gaging stations based on an analysis of streamflow-gaging station records. The annual exceedance probability was 0.03 for the September 2010 peak streamflow at the Geological Survey's streamflow-gaging stations 08104700 North Fork San Gabriel River near Georgetown, Texas, and 08154700 Bull Creek at Loop 360 near Austin, Texas. The annual exceedance probability was 0.02 for the peak streamflow for Geological Survey's streamflow-gaging station 08104500 Little River near Little River, Texas. The lack of similarity in the annual exceedance probabilities computed for precipitation and streamflow might be attributed to the small areal extent of the heaviest rainfall over these and the other gaged

  20. 76 FR 44898 - Texas Eastern Transmission, LP; Notice of Application

    Science.gov (United States)

    2011-07-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-508-000] Texas Eastern... lateral line transportation service to the Grays Ferry Cogeneration Partnership (Grays Ferry) and..., the anticipated date for the Commission staff's issuance of the final environmental impact statement...

  1. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    International Nuclear Information System (INIS)

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development

  2. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development.

  3. Texas market profile: soil and groundwater decontamination sector

    International Nuclear Information System (INIS)

    1998-12-01

    The soil and groundwater decontamination market in Texas generated $7 billion in earnings in 1997 and should reach almost $9 billion in 2002. While Texas has introduced voluntary clean-up programs, decontamination is required at more than 200,000 sites. Pollution has arisen from such industrial sectors as chemicals, crude oil and natural gas. In Texas, government agency decontamination activities provide major business opportunities. As in the base of the environmental sector as a whole, economic factors are gradually taking over from regulation as the prime demand drivers. Cost and risk are major concerns for clients. Because the incentive to reduce costs and the trend toward contracting out and privatization are becoming stronger, companies with specialized technologies have opportunities in this market. The government is the main client for environmental restoration services, but the private sector is accounting for an increased share of the market. Aspects of market access discussed include: implications of NAFTA and 'Buy America', ATA carnets, the Environmental Technology Verification Program, centralized database, federal government contracting announcements, partnerships, and payment conditions

  4. Archeological Investigations in the Truscott Reservoir Area. King and Knox Counties, Texas,

    Science.gov (United States)

    1978-06-01

    postdate the deposit. Collections consist of an upper molar of Equus sp., two di’stal epiphyses of metapodials of Bison sp., a glenoid fossa of a...includes two lower molars of Equus sp., a fragment of a jaw condyle, and a rib fragment. Since very little material was found at any of these sites, and...Archeological Survey Report No. 6. Austin. 364 McCormick, Olin F. 1976 The Archaic Period in North Central Texas. In The Texas Archaic: A Symposium, edited

  5. Challenges with Final Status Surveys at a Large Decommissioning Site - 13417

    International Nuclear Information System (INIS)

    Downey, Heath; Collopy, Peter; Shephard, Eugene; Walter, Nelson; Conant, John

    2013-01-01

    As part of decommissioning a former nuclear fuel manufacturing site, one of the crucial final steps is to conduct Final Status Surveys (FSS) in order to demonstrate compliance with the release criteria. At this decommissioning site, the area for FSS was about 100 hectares (248 acres) and included varying terrain, wooded areas, ponds, excavations, buildings and a brook. The challenges in performing the FSS included determining location, identifying FSS units, logging gamma walkover survey data, determining sample locations, managing water in excavations, and diverting water in the brook. The approaches taken to overcome these challenges will be presented in the paper. The paper will present and discuss lessons learned that will aid others in the FSS process. (authors)

  6. Lake Aquilla - Habitat Survey Hill County, Texas

    Science.gov (United States)

    2017-08-01

    forb dominated areas with scattered clumps of trees and shrubs , Lake Aquilla, Texas. ............................... 17 Figure 12. Site photo from...demonstrating low cover by undesirable trees and shrubs within the prairie remnant, but with high densities of woody vegetation encroaching the...multiple strata of sub-canopy trees, shrubs , and vines. Although these types of stands are accounted for in some historical records, the mosaics of oak

  7. Education Outreach Associated with Technology Transfer in a Colonia of South Texas: Green Valley Farms Science and Space Club for Middle School Aged Children in Green Valley Farms, San Benito, Texas

    Science.gov (United States)

    Potess, Marla D.; Rainwater, Ken; Muirhead, Dean

    2004-01-01

    Texas colonias are unincorporated subdivisions characterized by inadequate water and wastewater infrastructure, inadequate drainage and road infrastructure, substandard housing, and poverty. Since 1989 the Texas Legislature has implemented policies to halt further development of colonias and to address water and wastewater infrastructure needs in existing and new colonias along the border with Mexico. Government programs and non-government and private organization projects aim to address these infrastructure needs. Texas Tech University's Water Resources Center demonstrated the use of alternative on-site wastewater treatment in the Green Valley Farms colonia, San Benito, Texas. The work in Green Valley Farms was a component of a NASA-funded project entitled Evaluation of NASA's Advanced Life Support Integrated Water Recovery System for Non-Optimal Conditions and Terrestrial Applications. Two households within the colonia are demonstration sites for constructed wetlands. A colonia resident and activist identified educational opportunities for colonia children as a primary goal for many colonia residents. Colonia parents view education as the door to opportunity and escape from poverty for their children. The educational outreach component of the project in Green Valley Farms was a Science and Space Club for middle-school age students. Involved parents, schoolteachers, and school administrators enthusiastically supported the monthly club meetings and activities. Each month, students participated in interactive learning experiences about water use and reuse in space and on earth. Activities increased knowledge and interest in water resource issues and in science and engineering fields. The Institute for the Development and Enrichment of Advanced Learners (IDEAL) at Texas Tech University provided full scholarships for five students from Green Valley Farms to attend the Shake Hands With Your Future camp at Texas Tech University in June 2003. The educational outreach

  8. 21 CFR 808.93 - Texas.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Texas. 808.93 Section 808.93 Food and Drugs FOOD... and Local Exemptions § 808.93 Texas. (a) The following Texas medical device requirement is enforceable... that, in enforcing this requirement, Texas apply the definition of “used hearing aid” in § 801.420(a)(6...

  9. Typhus in Texas

    Centers for Disease Control (CDC) Podcasts

    Dr. Kristy Murray, an associate professor in pediatrics and assistant dean of the National School of Tropical Medicine at Baylor College of Medicine and Texas Children's Hospital, discusses increased cases of typhus in southern Texas.

  10. Environmental considerations. Environmental impacts of uranium mining in South Texas

    International Nuclear Information System (INIS)

    Kallus, M.F.

    1977-01-01

    Recent investigations of uranium mining and milling activities in the Grants Mineral Belt of New Mexico revealed serious environmental problems associated with these activities. An investigation was undertaken in the South Texas Uranium Belt to determine whether or not similar or other environmental problems existed. The study describes: (1) the history of uranium mining and milling in South Texas, (2) the area economy and demography, (3) the occurrence of uranium ore and (4) the regulatory aspects of uranium mining and milling in South Texas. The commercial recovery and processing of uranium in this area is described in some detail. Exploration, open pit mining, in-situ solution mining and processing techniques for ''yellowcake'' (U 3 O 8 ), the uranium product of the area, are discussed. The state and federal regulations pertinent to uranium mining and milling are summarized. Finally, the environmental effects of these activities are discussed and conclusions and recommendations are drawn

  11. SUPERCOLLIDER: Texas meeting

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    With preparations pushing forward for the Superconducting Supercollider (SSC) to be built in Ellis County, Texas, there was a full agenda at the third SSC fall conference, held in Corpus Christi, Texas, from 14-17 October

  12. Safeguards for final disposal of spent nuclear fuel. Methods and technologies for the Olkiluoto site

    International Nuclear Information System (INIS)

    Okko, O.

    2003-05-01

    The final disposal of the nuclear material shall introduce new safeguards concerns which have not been addressed previously in IAEA safeguards approaches for spent fuel. The encapsulation plant to be built at the site will be the final opportunity for verification of spent fuel assemblies prior to their transfer to the geological repository. Moreover, additional safety and safeguards measures are considered for the underground repository. Integrated safeguards verification systems will also concentrate on environmental monitoring to observe unannounced activities related to possible diversion schemes at the repository site. The final disposal of spent nuclear fuel in geological formation will begin in Finland within 10 years. After the geological site investigations and according to legal decision made in 2001, the final repository of the spent nuclear fuel shall be located at the Olkiluoto site in Eurajoki. The next phase of site investigations contains the construction of an underground facility, called ONKALO, for rock characterisation purposes. The excavation of the ONKALO is scheduled to start in 2004. Later on, the ONKALO may form a part of the final repository. The plans to construct the underground facility for nuclear material signify that the first safeguards measures, e.g. baseline mapping of the site area, need to take prior to the excavation phase. In order to support the development and implementation of the regulatory control of the final disposal programme, STUK established an independent expert group, LOSKA. The group should support the STUK in the development of the technical safeguards requirements, in the implementation of the safeguards and in the evaluation of the plans of the facility operator. This publication includes four background reports produced by this group. The first of these 'NDA verification of spent fuel, monitoring of disposal canisters, interaction of the safeguards and safety issues in the final disposal' describes the new

  13. Texas Yehaa !!!

    DEFF Research Database (Denmark)

    Kjellberg, Kurt

    2001-01-01

    Indtryk fra et besøg på SLA, Special Libraries Associations årlige konference, San Antonio, Texas, USA, 9.-13. juni 2001. "An Information Odyssey: Seizing the Competitive Advantage"......Indtryk fra et besøg på SLA, Special Libraries Associations årlige konference, San Antonio, Texas, USA, 9.-13. juni 2001. "An Information Odyssey: Seizing the Competitive Advantage"...

  14. 75 FR 68398 - Texas, Oklahoma & Eastern Railroad, LLC-Acquisition and Operation Exemption-Texas, Oklahoma...

    Science.gov (United States)

    2010-11-05

    ... & Eastern Railroad, LLC--Acquisition and Operation Exemption--Texas, Oklahoma & Eastern Railroad Company Texas, Oklahoma & Eastern Railroad, LLC (TOE), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from Texas, Oklahoma & Eastern Railroad Company and to operate...

  15. Protective barrier systems for final disposal of Hanford Waste Sites

    International Nuclear Information System (INIS)

    Phillips, S.J.; Hartley, J.N.

    1986-01-01

    A protecting barrier system is being developed for potential application in the final disposal of defense wastes at the Hanford Site. The functional requirements for the protective barrier are control of water infiltration, wind erosion, and plant and animal intrusion into the waste zone. The barrier must also be able to function without maintenance for the required time period (up to 10,000 yr). This paper summarizes the progress made and future plans in this effort to design and test protective barriers at the Hanford Site

  16. Identification of sites within the Palo Duro Basin. Volume 1. Palo Duro Location A

    International Nuclear Information System (INIS)

    1984-11-01

    This three-volume document narrows to two sites for continued investigations for potential nuclear waste repository sites in the Palo Duro Basin of the Texas Panhandle. Volume 1 narrows a site previously identified in Deaf Smith County, Texas; Volume 2 narrows a site previously identified in Swisher County, Texas; and Volume 3 contains responses to comments received regarding the drafts of Volumes 1 and 2 (BMI/ONWI-531). These volumes discuss the methodology and logic used as well as the results that narrowed these sites. Each of the 10 site performance criteria was divided into descriptors related to site performance characteristics. Each descriptor was evaluated by a systematic logic to determine if it could be used as a discriminator. Then more- and less-preferred areas for groups of discriminators were defined and composite maps were prepared and evaluated to identify the sites

  17. Identification of sites within the Palo Duro Basin. Volume 2. Palo Duro Location B

    International Nuclear Information System (INIS)

    1984-11-01

    This three-volume document narrows to two sites for continued investigations for potential nuclear waste repository sites in the Palo Duro Basin of the Texas Panhandle. Volume 1 narrows a site previously identified in Deaf Smith County, Texas; Volume 2 narrows a site previously identified in Swisher County, Texas; and Volume 3 contains responses to comments received regarding the drafts of Volumes 1 and 2 (BMI/ONWI-531). These volumes discuss the methodology and logic used as well as the results that narrowed these sites. Each of the 10 site performance criteria was divided into descriptors related to site performance characteristics. Each descriptor was evaluated by a systematic logic to determine if it could be used as a discriminator. Then more- and less-preferred areas for groups of discriminators were defined and composite maps were prepared and evaluated to identify the sites

  18. The Texas Air Quality Study: State of the Science of Ozone and Particulate Matter formation in Texas and Implications for Air Quality Policy

    Science.gov (United States)

    Allen, D. T.

    2002-05-01

    The Texas Air Quality Study (TexAQS) was performed during August and September of 2000; approximately 300 investigators from around the world made measurements of air pollutant concentrations and meteorological variables in southeast Texas. Five aircraft were deployed; five major ground chemistry sites were established and approximately 20 peripheral sites were established for collecting additional meteorological and chemical data. The scope, goals and preliminary results are available at the study web sites (www.utexas.edu/research/ceer/texaqs and www.utexas.edu/research/ceer/texaqsarchive). This presentation will provide an overview of the main findings from the study and will describe the role that ongoing data analysis activities are having on the development of air quality policy in the State of Texas. Some of the major findings are: Finding 1. Almost without exception, air parcels with very high ozone concentrations, observed by aircraft during the Texas Air Quality Study, had back trajectories that indicated a substantial contribution of emissions from industrial source regions. These air parcels also had chemical compositions that were representative of industrial sources, rather than typical urban sources. Finding 2: The rate of ozone production in and around the industrial source dominated areas in Houston can be very high, commonly exceeding 50 ppb/hr, and at times approaching instantaneous rates of 200 ppb/hr. Finding 3: The efficiency of ozone production in and around the industrial source dominated areas in Houston can be very high, ranging from 10-20 molecules of ozone per molecule of reacted NOx. Finding 4. Ozone production in the Houston urban plume was found to be slower and less efficient than in the composite industrial plume from the Ship Channel region and in plumes from isolated petrochemical facilities. Finding 5. The high rates and high efficiencies of ozone production in the industrial plumes are driven by high concentrations of reactive

  19. 33 CFR 165.804 - Snake Island, Texas City, Texas; mooring and fleeting of vessels-safety zone.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Snake Island, Texas City, Texas... Guard District § 165.804 Snake Island, Texas City, Texas; mooring and fleeting of vessels—safety zone. (a) The following is a safety zone: (1) The west and northwest shores of Snake Island; (2) The...

  20. Technical procedures for implementation of aesthetics site studies, Deaf Smith County site, Texas: Environmental Field Program

    International Nuclear Information System (INIS)

    1987-06-01

    This chapter introduces the purpose and scope of the visually affected areas determination, as well as definitions, interfaces, and concurrent data needs. This procedure provides a method for determining the extent of visibility of the project. This area is identified as the visually affected area, and becomes the area within which all visual analysis is conducted. The visually affected area analysis of the Deaf Smith County site will involve identifying and mapping the visibility of all major proposed project features. Baseline analysis will be conducted within the overall visually affected area; impact assessment will be conducted within the visually affected area of each major project feature. This procedure presents the guidelines for determining the visually affected area will be in computer data base construction; viewshed modeling, and site visit and verification of results. Computer data base construction will involve digitizing topographic and project facility data from available data source. The extent of the visible area from each major project feature will then be plotted. Finally, these computer-generated visibility plots will be verified in the field

  1. Structural constraints for proposed Fort Hancock low-level radioactive waste disposal site (NTP-S34), southern Hudspeth County, Texas

    International Nuclear Information System (INIS)

    Lemone, D.V.

    1989-01-01

    Structural complexities reduce the homogeneity necessary for a site characterization model to an unacceptable level for performance assessment for radioactive waste disposal sites. The proposed site lies between the northern, stable Diablo platform and the southern, mobile Mesozoic Chihuahua tectonic belt. Structural movement along this interface has been active for the past 14,000 years. In addition, the area lies along the northern margin of the Permian Marfa basin and the northeastern margin of the deeply faulted Hueco bolson segment of the late Cenozoic Rio Grande rift system. Recent seismic activity with extensive surface rupture in Quitman Canyon (30 mi southeast of the site) is also documented from the 1931 Valentine, Texas, earthquake (6.4 Richter scale). The site is underlain by either a thrust fault or the complex terminus of a Mesozoic thrust fault. This fault is a segment of the continuous thrust sheet extending from exposures in the Sierra Blanc area, 30 mi east (Devil Ridge fault), to the El Paso area west (Rio Grande fault). This segment of the Devil Ridge-Rio Grande thrust is documented by the Haymond Krupp No. 1 Thaxton wildcat drilled at Campogrande Mountain immediately south of the site. The recent rift fault scarp (Campo Grande) immediately south of the Thaxton well has a 17-mi surface trace and is, no doubt, related to the subsurface Clint fault to the west in the El Paso area. An additional complexity is the presence of a monoclinal flexure with a minimum of 900 ft of surface relief (2 mi northeast of NTP-S34). A 4.5-mi, east-west, down-to-the-south normal fault occurs near the top of the monocline with a small associated graben. These complexities seriously compromise the proposed Fort Hancock site

  2. Texas Disasters II: Utilizing NASA Earth Observations to Assist the Texas Forest Service in Mapping and Analyzing Fuel Loads and Phenology in Texas Grasslands

    Science.gov (United States)

    Brooke, Michael; Williams, Meredith; Fenn, Teresa

    2016-01-01

    The risk of severe wildfires in Texas has been related to weather phenomena such as climate change and recent urban expansion into wild land areas. During recent years, Texas wild land areas have experienced sequences of wet and dry years that have contributed to increased wildfire risk and frequency. To prevent and contain wildfires, the Texas Forest Service (TFS) is tasked with evaluating and reducing potential fire risk to better manage and distribute resources. This task is made more difficult due to the vast and varied landscape of Texas. The TFS assesses fire risk by understanding vegetative fuel types and fuel loads. To better assist the TFS, NASA Earth observations, including Landsat and Moderate Resolution Imaging Specrtoradiometer (MODIS) data, were analyzed to produce maps of vegetation type and specific vegetation phenology as it related to potential wildfire fuel loads. Fuel maps from 2010-2011 and 2014-2015 fire seasons, created by the Texas Disasters I project, were used and provided alternating, complementary map indicators of wildfire risk in Texas. The TFS will utilize the end products and capabilities to evaluate and better understand wildfire risk across Texas.

  3. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Summary and Guide for Stakeholders

    Energy Technology Data Exchange (ETDEWEB)

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723). DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  4. Hydraulic Testing of Salado Formation Evaporites at the Waste Isolation Pilot Plant Site: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Beauheim, Richard L.; Domski, Paul S.; Roberts, Randall M.

    1999-07-01

    This report presents interpretations of hydraulic tests conducted in bedded evaporates of the Salado Formation from May 1992 through May 1995 at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico. The WIPP is a US Department of Energy research and development facility designed to demonstrate safe disposal of transuranic wastes from the nation's defense programs. The WIPP disposal horizon is located in the lower portion of the Permian Salado Formation. The hydraulic tests discussed in this report were performed in the WIPP underground facility by INTERA inc. (now Duke Engineering and Services, Inc.), Austin, Texas, following the Field Operations Plan and Addendum prepared by Saulnier (1988, 1991 ) under the technical direction of Sandia National Laboratories, Albuquerque, New Mexico.

  5. Hydraulic Testing of Salado Formation Evaporites at the Waste Isolation Pilot Plant Site: Final Report

    International Nuclear Information System (INIS)

    Beauheim, Richard L.; Domski, Paul S.; Roberts, Randall M.

    1999-01-01

    This report presents interpretations of hydraulic tests conducted in bedded evaporates of the Salado Formation from May 1992 through May 1995 at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico. The WIPP is a US Department of Energy research and development facility designed to demonstrate safe disposal of transuranic wastes from the nation's defense programs. The WIPP disposal horizon is located in the lower portion of the Permian Salado Formation. The hydraulic tests discussed in this report were performed in the WIPP underground facility by INTERA inc. (now Duke Engineering and Services, Inc.), Austin, Texas, following the Field Operations Plan and Addendum prepared by Saulnier (1988, 1991 ) under the technical direction of Sandia National Laboratories, Albuquerque, New Mexico

  6. Assessment of trace ground-water contaminants release from south Texas in-situ uranium solution-mining sites

    Energy Technology Data Exchange (ETDEWEB)

    Kidwell, J.R.; Humenick, M.J.

    1981-01-01

    The future of uranium solution mining in south Texas depends heavily on the industry's ability to restore production zone ground water to acceptable standards. This study investigated the extent of trace contaminant solubilization during mining and subsequent restoration attempts, first through a literature search centered on uranium control mechanisms, and then by laboratory experiments simulating the mining process. The literature search indicated the complexity of the situation. The number of possible interactions between indigenous elements and materials pointed on the site specificity of the problem. The column studies evaluated three different production area ores. Uranium, molybdenum, arsenic, vanadium, and selenium were analyzed in column effluents. After simulated mining operations were completed, uranium was found to be the most persistent trace element. However, subsequent ground water flushing of the columns could restore in-situ water to EPA recommended drinking water concentrations. Limited data indicated that ground water flowing through mined areas may solubilize molybdenum present in down gradient areas adjacent to the production zone due to increased oxidation potential of ground water if adequate restoration procedures are not followed.

  7. Technical procedures for water resources: Volume 4, Deaf Smith County site, Texas: Environmental Field Program: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    This volume contains Technical Procedures pursuant to the water Resources Site Study Plan: including Collection, Preservation, and Shipment of Ground-Water Samples; Inventory Current Water Use and Estimating Projected Water Use; Estimation of Precipitation Depth, Duration, Frequence; Estimation of Probable Maximum Precipitation; Calculation of Floodplains

  8. Transforming Developmental Education in Texas

    Science.gov (United States)

    Journal of Developmental Education, 2014

    2014-01-01

    In recent years, with support from the Texas Legislature, the Texas Higher Education Coordinating Board has funded various developmental education initiatives, including research and evaluation efforts, to help Texas public institutions of higher education provide more effective programs and services to underprepared students. Based on evaluation…

  9. Sustainable Approach for Landfill Management at Final Processing Site Cikundul in Sukabumi City, Indonesia

    OpenAIRE

    Sri Darwati

    2012-01-01

    The main problem of landfill management in Indonesia is the difficulty in getting a location for Final Processing Sites (FPS) due to limited land and high land prices. Besides, about 95% of existing landfills are uncontrolled dumping sites, which could potentially lead to water, soil and air pollution. Based on data from the Ministry of Environment (2010), The Act of the Republic of Indonesia Number 18 Year 2008 Concerning Solid Waste Management, prohibits open dumping at final processing sit...

  10. Long-Term Structural Solution for the Mouth of Colorado River Navigation Channel, Texas

    National Research Council Canada - National Science Library

    Kraus, Nicholas C; Lin, Lihwa; Smith, Ernest R; Heilman, Daniel J; Thomas, Robert C

    2008-01-01

    ... in support of a reliable shallow-draft channel at the Mouth of the Colorado River (MCR), Texas. The site has experienced excessive sediment shoaling that has denied full project features to navigation channel users...

  11. Geothermal and heavy-oil resources in Texas

    Energy Technology Data Exchange (ETDEWEB)

    Seni, S.J.; Walter, T.G.

    1994-01-01

    In a five-county area of South Texas, geopressured-geothermal reservoirs in the Paleocene-Eocene Wilcox Group lie below medium- to heavy-oil reservoirs in the Eocene Jackson Group. This fortuitous association suggests the use of geothermal fluids for thermally enhanced oil recovery (TEOR). Geothermal fairways are formed where thick deltaic sandstones are compartmentalized by growth faults. Wilcox geothermal reservoirs in South Texas are present at depths of 11,000 to 15,000 ft (3,350 to 4,570 m) in laterally continuous sandstones 100 to 200 ft (30 to 60 m) thick. Permeability is generally low (typically 1 md), porosity ranges from 12 to 24 percent, and temperature exceeds 250{degrees}F (121{degrees}C). Reservoirs containing medium (20{degrees} to 25{degrees} API gravity) to heavy (10{degrees} to 20{degrees} API gravity) oil are concentrated along the Texas Coastal Plain in the Jackson-Yegua Barrier/Strandplain (Mirando Trend), Cap Rock, and Piercement Salt Dome plays and in the East Texas Basin in Woodbine Fluvial/Deltaic Strandplain and Paluxy Fault Line plays. Injection of hot, moderately fresh to saline brines will improve oil recovery by lowering viscosity and decreasing residual oil saturation. Smectite clay matrix could swell and clog pore throats if injected waters have low salinity. The high temperature of injected fluids will collapse some of the interlayer clays, thus increasing porosity and permeability. Reservoir heterogeneity resulting from facies variation and diagenesis must be considered when siting production and injection wells within the heavy-oil reservoir. The ability of abandoned gas wells to produce sufficient volumes of hot water over the long term will also affect the economics of TEOR.

  12. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  13. Helminth community of scaled quail (Callipepla squamata) from western Texas.

    Science.gov (United States)

    Landgrebe, Jill N; Vasquez, Barbara; Bradley, Russell G; Fedynich, Alan M; Lerich, Scott P; Kinsella, John M

    2007-02-01

    Forty-eight scaled quail (Callipepla squamata) were collected during August 2002 at Elephant Mountain Wildlife Management Area in Brewster County, Texas, and examined for helminths. Eight species of helminths were found (5 nematodes and 3 cestodes), representing 2,811 individuals. Of these species, Gongylonema sp., Procyrnea pileata, and Choanotaenia infundibulum are reported from scaled quail for the first time. Prevalence of Aulonocephalus pennula, Gongylonema sp., Oxyspirura petrowi, Physaloptera sp., P. pileata, C. infundibulum, Fuhrmannetta sp., and Rhabdometra odiosa was 98, 2, 56, 4, 60, 2, 25, and 35%, respectively. Aulonocephalus pennula numerically dominated, accounting for 88% of total worms. Statistical analyses were performed on the 5 species with > or = 25% prevalence using the after-hatch-year host sample (n = 38). Prevalence of P. pileata was higher (P = 0.049) in females than in males and higher (P = 0.037) in the sample collected from the site that had spreader dams (berms 1-2 m high and 4-55 m long constructed in varying sizes to catch and retain rainfall) than the control site (no spreader dams). Higher rank mean abundance of A. pennula and O. petrowi (P = 0.0001 and P = 0.0052, respectively) was found in the host sample collected from the site that had spreader dams than the control site. A host gender-by-collection site interaction (P = 0.0215) was observed for P. pileata. Findings indicate that scaled quail are acquiring indirect life cycle helminths in arid western Texas habitats.

  14. TEXAS MIGRANT LABOR, THE 1964 MIGRATION.

    Science.gov (United States)

    Good Neighbor Commission of Texas, Austin.

    THE MAJORITY OF TEXAS MIGRANTS LIVE IN SOUTH TEXAS AND APPROXIMATELY 95 PERCENT OF THEM ARE OF MEXICAN EXTRACTION. MOST OF THE OTHER FIVE PERCENT ARE EAST TEXAS NEGROES. THE MECHANIZATION OF COTTON HARVESTING AND THE EXPIRATION OF THE "BRACERO PROGRAM" IN 1964 HAVE CAUSED MORE TEXAS MIGRANTS TO SEEK EMPLOYMENT OUTSIDE OF THE STATE. DURING 1964,…

  15. Gaseous Oxidized Mercury Dry Deposition Measurements in the Southwestern USA: A Comparison between Texas, Eastern Oklahoma, and the Four Corners Area

    Directory of Open Access Journals (Sweden)

    Mark E. Sather

    2014-01-01

    Full Text Available Gaseous oxidized mercury (GOM dry deposition measurements using aerodynamic surrogate surface passive samplers were collected in central and eastern Texas and eastern Oklahoma, from September 2011 to September 2012. The purpose of this study was to provide an initial characterization of the magnitude and spatial extent of ambient GOM dry deposition in central and eastern Texas for a 12-month period which contained statistically average annual results for precipitation totals, temperature, and wind speed. The research objective was to investigate GOM dry deposition in areas of Texas impacted by emissions from coal-fired utility boilers and compare it with GOM dry deposition measurements previously observed in eastern Oklahoma and the Four Corners area. Annual GOM dry deposition rate estimates were relatively low in Texas, ranging from 0.1 to 0.3 ng/m2h at the four Texas monitoring sites, similar to the 0.2 ng/m2h annual GOM dry deposition rate estimate recorded at the eastern Oklahoma monitoring site. The Texas and eastern Oklahoma annual GOM dry deposition rate estimates were at least four times lower than the highest annual GOM dry deposition rate estimate previously measured in the more arid bordering western states of New Mexico and Colorado in the Four Corners area.

  16. US hydropower resource assessment for Texas

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.

    1993-12-01

    The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Texas.

  17. Site study plan for Exploratory shaft facilities design foundation boreholes (shaft surface facility foundation borings), Deaf Smith County Site, Texas: Surface-based geotechnical field program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-12-01

    This site study plan describes the Exploratory Shaft Facilities (ESF) Design Foundation Boreholes field activities to be conducted during early stages of Site Characterization at the Deaf Smith County, Texas, site. The field program has been designed to provide data useful in addressing information/data needs resulting from federal/state/local regulations, and repository program requirements. Approximately 50 foundation boreholes will be drilled within the ESP location to provide data necessary for design of the ESF and to satisfy applicable shaft permitting requirements. Soils and subsurface rock will be sampled as the foundation boreholes are advanced. Soil samples or rock core will be taken through the Blackwater Draw and Ogallala Formations and the Dockum Group. Hydrologic testing will be performed in boreholes that penetrates the water table. In-situ elastic properties will be determined from both the soil strata and rock units along the length of the boreholes. Field methods/tests are chosen that provide the best or only means of obtaining the required data. The Salt Repository Project (SRP) Networks specify the schedule under which the program will operate. Drilling will not begin until after site ground water baseline conditions have been established. The Technical Field Services Contractor is responsible for conducting the field program of drilling and testing. Samples and data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that the appropriate documentation is maintained. 25 refs., 10 figs., 6 tabs

  18. Environmental analysis of geopressured-geothermal prospect areas, Brazoria and Kenedy Counties, Texas

    Energy Technology Data Exchange (ETDEWEB)

    White, W.A.; McGraw, M.; Gustavson, T.C.

    1978-01-01

    Preliminary environmental data, including current land use, substrate lithology, soils, natural hazards, water resources, biological assemblages, meteorological data, and regulatory considerations have been collected and analyzed for approximately 150 km/sup 2/ of land: (1) near Chocolate Bayou, Brazoria County, Texas, where a geopressured-geothermal test well was drilled in 1978, and (2) near the rural community of Armstrong, Kenedy County, Texas, where future geopressured-geothermal test well development may occur. The study was designed to establish an environmental data base and to determine, within spatial constraints set by subsurface reservoir conditions, environmentally suitable sites for geopressured-geothermal wells.

  19. Technical procedures for water resources, Deaf Smith County site, Texas: Volume 1: Environmental Field Program: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    This volume contains Technical Procedures pursuant to the Water Resources Site Study Plan including, determination of basin topographic characteristics, determination of channel and playa lake characteristics, operation of a stream gaging station, operation of a playa lake stage gaging system, and processing of data from a playa lake stage gaging system

  20. Ecological, political and social challenges of prescribed fire restoration in east Texas pineywoods ecosystems: a case study

    Science.gov (United States)

    Sandra Rideout; Brian P. Oswald; Michael H. Legg

    2003-01-01

    The effectiveness of prescribed fire restoration of forested sites in three state parks in east Texas, USA was studied. Two sites consisted of mixed shortleaf (Pinus echinata Mill.) or loblolly pine (Pinus taeda L.) and broadleaf overstoreys. The third site was a longleaf pine (Pinus palustris Mill.)/little...

  1. Treatment and final disposal of nuclear waste. Siting of a deep repository

    International Nuclear Information System (INIS)

    1992-09-01

    Systems and facilities in the program for demonstration deposition of nuclear waste are presented. The siting process is described, from the general studies to the ultimate goal, where a permit to start demonstration deposition has been obtained. National and foreign experiences of siting issues are accounted for. Finally, the structure and plan for work for 1993-98 are outlined. 46 refs, 15 figs, 5 tabs

  2. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Ft. Hood Military Base Outside Killeen, Texas. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Geiger, J.; Lisell, L.; Mosey, G.

    2013-10-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative through the Region 6 contract, selected Ft. Hood Army Base in Killeen, Texas, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this study is to assess the site for possible photovoltaic (PV) system installations and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  3. Solar heating and hot water system installed at office building, One Solar Place, Dallas, Texas. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    This document is the Final Report of the Solar Energy System Installed at the First Solar Heated Office Building, One Solar Place, Dallas, Texas. The Solar System was designed to provide 87 percent of the space heating needs, 100 percent of the potable hot water needs and is sized for future absorption cooling. The collection subsystem consists of 28 Solargenics, series 76, flat plate collectors with a total area of 1596 square feet. The solar loop circulates an ethylene glycol-water solution through the collectors into a hot water system heat exchanger. The hot water storage subsystem consists of a heat exchanger, two 2300 gallon concrete hot water storage tanks with built in heat exchangers and a back-up electric boiler. The domestic hot water subsystem sends hot water to the 10,200 square feet floor area office building hot water fixtures. The building cold water system provides make-up to the solar loop, the heating loop, and the hot water concrete storage tanks. The design, construction, cost analysis, operation and maintenance of the solar system are described. The system became operational July 11, 1979.

  4. Alternatives for the disposal of NORM [naturally occurring radioactive materials] wastes in Texas

    International Nuclear Information System (INIS)

    Nielson, K.K.; Rogers, V.C.; Pollard, C.G.

    1989-01-01

    Some of the Texas wastes containing naturally occurring radioactive materials (NORM) have been disposed of in a uranium mill tailings impoundment. There is currently no operating disposal facility in Texas to accept these wastes. As a result, some wastes containing extremely small amounts of radioactivity are sent to elaborate disposal sites at extremely high costs. The Texas Low-Level Radioactive Waste Disposal Authority has sponsored a study to investigate lower cost, alternative disposal methods for certain wastes containing small quantities of NORM. This paper presents the results of a multipathway safety analysis of various scenarios for disposing of wastes containing limited quantities of NORM in Texas. The wastes include pipe scales and sludges from oil and gas production, residues from rare-earth mineral processing, and water treatment resins, but exclude large-volume, diffuse wastes (coal fly ash, phosphogypsum). The purpose of the safety analysis is to define concentration and quantity limits for the key nuclides of NORM that will avoid dangerous radiation exposures under different waste disposal scenarios

  5. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Science.gov (United States)

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  6. Siting actions in compacts and nonmember states

    International Nuclear Information System (INIS)

    Tullis, J.

    1986-05-01

    This paper examines the status of siting actions in those compacts and states currently progressing with siting studies. The efforts of the Central Compact Commission, Texas, California, Colorado and Illinois are highlighted to illustrate progress, methodology, and problems encountered

  7. Selection and cultivation of final vegetative cover for closed waste sites at the Savannah River Site, SC

    International Nuclear Information System (INIS)

    Cook, J.R.; Salvo, S.K.

    1992-01-01

    Low-level, hazardous, and mixed waste disposal sites normally require some form of plant material to prevent erosion of the final closure cap. Waste disposal sites are closed and capped in a complex scientific manner to minimize water infiltration and percolation into and through the waste material. Turf type grasses are currently being used as a vegetative cover for most sites. Consequently, the sites require periodic mowing and other expensive annual maintenance practices. The purpose of this five year study was to evaluate alternative plant material for use on wastes sites that is quickly and easily established and economically maintained, retards water infiltration, provides maximum year-round evapotranspiration, is ecologically acceptable and does not harm the closure cap. The results of the study are described in this report and suggest that two species of bamboo (Phyllostachys bissetii and P. rubromarainata) can be utilized to provide long lived, low maintenance, climax vegetation for the waste sites. These large species of bamboo will also reduce the probability of intrusion by humans, animals and deeply rooted plant species

  8. Forests of east Texas, 2016

    Science.gov (United States)

    Kerry Dooley

    2018-01-01

    This resource update provides an overview of forest resources in east Texas based on an inventory conducted by the U.S. Forest Service, Forest Inventory and Analysis (FIA) program at the Southern Research Station (SRS) in cooperation with Texas A&M Forest Service. The 254 counties of Texas are consolidated into seven FIA survey units—Southeast (unit 1),...

  9. Sylvatic trichinellosis in Texas

    Directory of Open Access Journals (Sweden)

    Pence D.B.

    2001-06-01

    Full Text Available There are no published reports of domestic or sylvatic trichinellosis in Texas. The aim of the present survey was to determine the presence of Trichinella species in selected representative species of potential wildlife reservoirs in southern Texas. In 1998-99, tongues of 211 wild mammals were collected in southern Texas: 154 coyotes (Canis latrans, three bobcats (Lynx rufus, 32 racoons (Procyon lotor, 1 3 opossum (Didelphis marsupialis, four ocelots (Leopardus pardalis and five wild boars (Sus scrofa. Presence of Trichinella sp. larvae was investigated by artificial digestion and larvae of positive samples were identified at the species level by a multiple-polymerase chain reaction analysis. Nine (5.8 % coyotes had trichinellosis ; in the muscles of seven of these coyotes, the larvae were identified as Trichinella murrelli. This is the first report of sylvatic trichinellosis in Texas.

  10. Final disposal of spent nuclear fuel - basis for site selection

    International Nuclear Information System (INIS)

    Anttila, P.

    1995-05-01

    International organizations, e.g. IAEA, have published several recommendations and guides for the safe disposal of radioactive waste. There are three major groups of issues affecting the site selection process, i.e. geological, environmental and socioeconomic. The first step of the site selection process is an inventory of potential host rock formations. After that, potential study areas are screened to identify sites for detailed investigations, prior to geological conditions and overall suitability for the safe disposal. This kind of stepwise site selection procedure has been used in Finland and in Sweden. A similar approach has been proposed in Canada, too. In accordance with the amendment to the Nuclear Energy Act, that entered into force in the beginning of 1995, Imatran Voima Oy has to make preparations for the final disposal of spent fuel in the Finnish bedrock. Relating to the possible site selection, the following geological factors, as internationally recommended and used in the Nordic countries, should be taken into account: topography, stability of bedrock, brokenness and fracturing of bedrock, size of bedrock block, rock type, predictability and natural resources. The bedrock of the Loviisa NPP site is a part of the Vyborg rapakivi massif. As a whole the rapakivi granite area forms a potential target area, although other rock types or areas cannot be excluded from possible site selection studies. (25 refs., 7 figs.)

  11. Typhus in Texas

    Centers for Disease Control (CDC) Podcasts

    2017-07-06

    Dr. Kristy Murray, an associate professor in pediatrics and assistant dean of the National School of Tropical Medicine at Baylor College of Medicine and Texas Children’s Hospital, discusses increased cases of typhus in southern Texas.  Created: 7/6/2017 by National Center for Emerging and Zoonotic Infectious Diseases (NCEZID).   Date Released: 7/6/2017.

  12. Texas geothermal R D and D program planning support document. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Davis, R.J.; Conover, M.F.; Keeney, R.C.; Personett, M.L.; Richmann, D.L.

    1981-08-28

    Program planning support was provided by; developing a geothermal RD and D program structure, characterizing the status of geothermal RD and D through review of literature and interaction with the geothermal research community, developing a candidate list of future Texas geothermal projects, and prioritizing the candidate projects based on appropriate evaluation criteria. The method used to perform this study and the results thereof are presented. Summary reviews of selected completed and ongoing projects and summary descriptions and evaluations of the candidate RD and D projects ar provided. A brief discussion emerging federal RD and D policies is presented. References and independent project rankings by three of the GRP members are included. (MHR)

  13. An updated understanding of Texas bumble bee (Hymenoptera: Apidae species presence and potential distributions in Texas, USA

    Directory of Open Access Journals (Sweden)

    Jessica L. Beckham

    2017-08-01

    Full Text Available Texas is the second largest state in the United States of America, and the largest state in the contiguous USA at nearly 700,000 sq. km. Several Texas bumble bee species have shown evidence of declines in portions of their continental ranges, and conservation initiatives targeting these species will be most effective if species distributions are well established. To date, statewide bumble bee distributions for Texas have been inferred primarily from specimen records housed in natural history collections. To improve upon these maps, and help inform conservation decisions, this research aimed to (1 update existing Texas bumble bee presence databases to include recent (2007–2016 data from citizen science repositories and targeted field studies, (2 model statewide species distributions of the most common bumble bee species in Texas using MaxEnt, and (3 identify conservation target areas for the state that are most likely to contain habitat suitable for multiple declining species. The resulting Texas bumble bee database is comprised of 3,580 records, to include previously compiled museum records dating from 1897, recent field survey data, and vetted records from citizen science repositories. These data yielded an updated state species list that includes 11 species, as well as species distribution models (SDMs for the most common Texas bumble bee species, including two that have shown evidence of range-wide declines: B. fraternus (Smith, 1854 and B. pensylvanicus (DeGeer, 1773. Based on analyses of these models, we have identified conservation priority areas within the Texas Cross Timbers, Texas Blackland Prairies, and East Central Texas Plains ecoregions where suitable habitat for both B. fraternus and B. pensylvanicus are highly likely to co-occur.

  14. Rising Above the Storm: DIG TEXAS

    Science.gov (United States)

    Ellins, K. K.; Miller, K. C.; Bednarz, S. W.; Mosher, S.

    2011-12-01

    For a decade Texas educators, scientists and citizens have shown a commitment to earth science education through planning at the national and state levels, involvement in earth science curriculum and teacher professional development projects, and the creation of a model senior level capstone Earth and Space Science course first offered in 2010 - 2011. The Texas state standards for Earth and Space Science demonstrate a shift to rigorous content, career relevant skills and use of 21st century technology. Earth and Space Science standards also align with the Earth Science, Climate and Ocean Literacy framework documents. In spite of a decade of progress K-12 earth science education in Texas is in crisis. Many school districts do not offer Earth and Space Science, or are using the course as a contingency for students who fail core science subjects. The State Board for Educator Certification eliminated Texas' secondary earth science teacher certification in 2009, following the adoption of the new Earth and Space Science standards. This makes teachers with a composite teacher certification (biology, physics and chemistry) eligible to teach Earth and Space Science, as well other earth science courses (e.g., Aquatic Science, Environmental Systems/Science) even if they lack earth science content knowledge. Teaching materials recently adopted by the State Board of Education do not include Earth and Space Science resources. In July 2011 following significant budget cuts at the 20 Education Service Centers across Texas, the Texas Education Agency eliminated key staff positions in its curriculum division, including science. This "perfect storm" has created a unique opportunity for a university-based approach to confront the crisis in earth science education in Texas which the Diversity and Innovation in the Geosciences (DIG) TEXAS alliance aims to fulfill. Led by the Texas A&M University College of Geosciences and The University of Texas Jackson School of Geosciences, with

  15. Ecological Baseline, Fort Hood, Texas

    Science.gov (United States)

    1980-08-01

    cedar eTm (Uiimus crassifolia), Texas ash (Fraxinus texansis), and Texas persimmon ( Diospyros texana). Conversely, the two predominant tree species...Ilex decidua), Mex- ican buckeye (Ungnadia spjeciosa), and Texas persimmon ( Diospyros texana). Vines included greenbrier (Smilax bona-nox) and white...Hedgehey Cactus (Echinocereus sp.) has been observed on Fort Hood. Due to the brief period of flowering for this genus , the individual species were not

  16. Water supply and needs for West Texas

    Science.gov (United States)

    This presentation focused on the water supplies and needs of West Texas, Texas High Plains. Groundwater is the most commonly used water resources on the Texas High Plains, with withdrawals from the Ogallala Aquifer dominating. The saturation thickness of the Ogallala Aquifer in Texas is such that t...

  17. 75 FR 21534 - Texas Regulatory Program

    Science.gov (United States)

    2010-04-26

    ... improve operational efficiency. This document gives the times and locations that the Texas program and... during regular business hours at the following location: Surface Mining and Reclamation Division... locations listed above under ADDRESSES. Texas proposes to revise its regulation at 16 Texas Administrative...

  18. The social and special effects of siting a low-level radioactive waste disposal facility in rural Texas

    International Nuclear Information System (INIS)

    Murdock, S.H.; Hamm, R.R.

    1987-01-01

    As part of its assessment of the impacts of a low-level radioactive waste disposal facility in Hudspeth County, the Texas Low-Level Radioactive Waste Disposal Authority (TLLRWDA) sponsored an independent study of the social and special impacts of the facility. These impacts include ''standard'' social impacts (such as impacts on social structures and attitudes, values and perceptions and ''special'' social impacts (such as fear, anxiety, concerns related to equity, the health of future generations, etc.). This paper reports the results of this study. Personal interviews with 71 community leaders and 96 randomly selected county residents were conducted during the summer of 1986. The results suggest that the major concern relates to the contamination of ground water, but that suspicion about the equity of the siting process and about the safe management of wastes is extensive, even among the most knowledgeable respondents. Mitigation concerns center on health and safety issues for residents and on potential forms of mitigation for governmental jurisdictions for leaders. Responses were similar for leaders and residents and for persons in different parts of the county

  19. Environmental Survey preliminary report, Strategic Petroleum Reserve, Texas and Louisiana Gulf Coast

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    This report presents the preliminary environmental findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Strategic Petroleum Reserve (SPR), located in Louisiana and Texas, and conducted in two segments from November 30 through December 11, 1987, and February 1 through 10, 1988. The Survey is being conducted by a multidisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with SPR. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involved the review of existing site environmental data, observations of the operations carried on at SPR, and interviews with site personnel. The Survey team has developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory. When completed, the results will be incorporated into the SPR Survey findings for inclusion into the Environmental Survey Summary Report. The Summary Report will reflect the final determinations of the SPR Survey and the other DOE site-specific Surveys. 200 refs., 50 figs., 30 tabs.

  20. Industrial Sites Project Establishment of Final Action Levels

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2006-01-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) oversees numerous sites on the Nevada Test Site (NTS) and other locations in the State of Nevada that have been impacted by activities related to the development and testing of nuclear devices and by other activities. NNSA/NSO is responsible for protecting members of the public, including site workers, from harmful exposure to both chemical and radiological contaminants at these sites as they remediate these sites. The Nevada Division of Environmental Protection (NDEP) is the primary state agency responsible for protection of human health and the environment with respect to chemical and radiological wastes. In 1996 the DOE, U.S. Department of Defense, and the State of Nevada entered into an agreement known as the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Appendix VI to the FFACO describes the strategy employed to plan, implement, and complete environmental corrective action activities at NTS and other locations in the state of Nevada. One of the categories of corrective action units (CAUs) is Industrial Sites, which consists of approximately 1,150 locations that may require some level of investigation and corrective action. To evaluate the need for the extent of corrective action at a particular site, NNSA/NSO assesses the potential impacts to receptors by comparing measurements of contaminant concentrations to risk-based (chemical) and dose-based (radionuclide) standards (action levels). Preliminary action levels (PALs) are established as part of the data quality objective (DQO) process, and are presented in one or more FFACO documents generated as part of the corrective action process. This document formally defines and clarifies the NDEP-approved process NNSA/NSO Industrial Sites Project uses to fulfill the requirements of the FFACO and state regulations. This process establishes final action levels (FALs) based on the risk

  1. Regulatory Project Manager for Salina and Permian Basins for the NWTS [National Waste Terminal Storage] Program: Final techical report

    International Nuclear Information System (INIS)

    1986-12-01

    The identification of candidate sites for nuclear waste repositories involves geological and environmental studies to characterize potential sites. These investigations include the collection and analysis of detailed geological and environmental data and comparison of the data against predetermined site performance criteria, i.e., geologic characteristics, environmental protection, and socioeconomic impacts. The work summarized in this final technical report encompasses mainly ''environmental characterization'' studies in the Permian Basin in the Texas Panhandle during the period of 1977-86; in the earlier phase of the contract, regional environmental work was also done in the Salina Basin (1977-79) and certain licensing support activities and safety analyses were conducted (1977-82). Considerable regulatory support work was also performed during 1986. 9 figs., 2 tabs

  2. 76 FR 50708 - Texas Regulatory Program

    Science.gov (United States)

    2011-08-16

    ..., renewals, and significant revisions. Texas intends to revise its program to improve operational efficiency. This document provides the times and locations that the Texas program and proposed amendments to that... business hours at the following location: Railroad Commission of Texas, 1701 North Congress Ave., Austin...

  3. 78 FR 11579 - Texas Regulatory Program

    Science.gov (United States)

    2013-02-19

    ... Interest and Compliance Information (Underground Mining). Texas proposed to delete old language in Sec. 12.... Therefore, we approve Texas' deletion. Texas proposed to delete old language in Sec. 12.156 regarding the... proposed to add new language regarding certifying and updating existing permit information, permit...

  4. Is the Texas Pecan Checkoff Program Working?

    OpenAIRE

    Moore, Eli D.; Williams, Gary W.

    2008-01-01

    The Texas Pecan Board was established in 1998 to administer the Texas Pecan Checkoff Program and is financed through a one-half cent per pound assessment on grower pecan sales. The Board spends the assessment collections on a variety of advertising campaigns in an attempt to expand demand for Texas pecans, both improved and native varieties, and increase the welfare of Texas pecan growers. This study presents an evaluation of the economic effectiveness of the Texas Pecan Checkoff Program in e...

  5. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Webb, Robert C. [Texas A& M University; Kamon, Teruki [Texas A& M University; Toback, David [Texas A& M University; Safonov, Alexei [Texas A& M University; Dutta, Bhaskar [Texas A& M University; Dimitri, Nanopoulos [Texas A& M University; Pope, Christopher [Texas A& M University; White, James [Texas A& M University

    2013-11-18

    Overview The High Energy Physics Group at Texas A&M University is submitting this final report for our grant number DE-FG02-95ER40917. This grant has supported our wide range of research activities for over a decade. The reports contained here summarize the latest work done by our research team. Task A (Collider Physics Program): CMS & CDF Profs. T. Kamon, A. Safonov, and D. Toback co-lead the Texas A&M (TAMU) collider program focusing on CDF and CMS experiments. Task D: Particle Physics Theory Our particle physics theory task is the combined effort of Profs. B. Dutta, D. Nanopoulos, and C. Pope. Task E (Underground Physics): LUX & NEXT Profs. R. Webb and J. White(deceased) lead the Xenon-based underground research program consisting of two main thrusts: the first, participation in the LUX two-phase xenon dark matter search experiment and the second, detector R&D primarily aimed at developing future detectors for underground physics (e.g. NEXT and LZ).

  6. The Texas low-level waste compact: Classification and semantic problems

    International Nuclear Information System (INIS)

    LeMone, D.V.

    1995-01-01

    The disposal of low-level radioactive wastes for the State of Texas, as well as the participating compact states of Maine and Vermont, will require a stable classification scheme and a mutually acceptable series of definitions for the orderly planning, development, emplacement, and closure of the proposed Texas low-level site. Under the currently utilized system of classification, low-level radioactive wastes are usually segregated under six basic classes. These classes are: Class A, Class B, Class C, NARM, NORM, and Mixed Low-Level Waste. These wastes originate from two primary sources: utility generators and non-utility generators (medical/industrial/university). The Texas Low-Level Radioactive Waste Disposal Site currently will not accept either Greater Than Class C (GTCC) waste or Transuranic (TRU) waste (exceeding 370 Bq/g (10 nCi/g)), thereby establishing the upper limits for disposal. One basic problem for all low-level entities is the national classification scheme. There is no currently defined lower limit for radioactive wastes. This standard is essential and must be addressed in order to effectively project future waste streams. Semantic problems include the rendering of precise definitions for such common words as processing, recycling, generation, etc.; they are not necessarily defined or used in the same sense between generators or states. Consistency in terminology is an absolute essential for adequate nuclear waste management. Other problems that must be addressed include such areas as: types of beneficiation of waste (supercompaction and incineration versus untreated waste), validation of point of origin, consistent and easily recognizable labeling that includes an inventory, transport tracking, and package standards

  7. Chagas disease risk in Texas.

    Science.gov (United States)

    Sarkar, Sahotra; Strutz, Stavana E; Frank, David M; Rivaldi, Chissa-Louise; Sissel, Blake; Sánchez-Cordero, Victor

    2010-10-05

    Chagas disease, caused by Trypanosoma cruzi, remains a serious public health concern in many areas of Latin America, including México. It is also endemic in Texas with an autochthonous canine cycle, abundant vectors (Triatoma species) in many counties, and established domestic and peridomestic cycles which make competent reservoirs available throughout the state. Yet, Chagas disease is not reportable in Texas, blood donor screening is not mandatory, and the serological profiles of human and canine populations remain unknown. The purpose of this analysis was to provide a formal risk assessment, including risk maps, which recommends the removal of these lacunae. The spatial relative risk of the establishment of autochthonous Chagas disease cycles in Texas was assessed using a five-stage analysis. 1. Ecological risk for Chagas disease was established at a fine spatial resolution using a maximum entropy algorithm that takes as input occurrence points of vectors and environmental layers. The analysis was restricted to triatomine vector species for which new data were generated through field collection and through collation of post-1960 museum records in both México and the United States with sufficiently low georeferenced error to be admissible given the spatial resolution of the analysis (1 arc-minute). The new data extended the distribution of vector species to 10 new Texas counties. The models predicted that Triatoma gerstaeckeri has a large region of contiguous suitable habitat in the southern United States and México, T. lecticularia has a diffuse suitable habitat distribution along both coasts of the same region, and T. sanguisuga has a disjoint suitable habitat distribution along the coasts of the United States. The ecological risk is highest in south Texas. 2. Incidence-based relative risk was computed at the county level using the Bayesian Besag-York-Mollié model and post-1960 T. cruzi incidence data. This risk is concentrated in south Texas. 3. The

  8. Chagas disease risk in Texas.

    Directory of Open Access Journals (Sweden)

    Sahotra Sarkar

    Full Text Available BACKGROUND: Chagas disease, caused by Trypanosoma cruzi, remains a serious public health concern in many areas of Latin America, including México. It is also endemic in Texas with an autochthonous canine cycle, abundant vectors (Triatoma species in many counties, and established domestic and peridomestic cycles which make competent reservoirs available throughout the state. Yet, Chagas disease is not reportable in Texas, blood donor screening is not mandatory, and the serological profiles of human and canine populations remain unknown. The purpose of this analysis was to provide a formal risk assessment, including risk maps, which recommends the removal of these lacunae. METHODS AND FINDINGS: The spatial relative risk of the establishment of autochthonous Chagas disease cycles in Texas was assessed using a five-stage analysis. 1. Ecological risk for Chagas disease was established at a fine spatial resolution using a maximum entropy algorithm that takes as input occurrence points of vectors and environmental layers. The analysis was restricted to triatomine vector species for which new data were generated through field collection and through collation of post-1960 museum records in both México and the United States with sufficiently low georeferenced error to be admissible given the spatial resolution of the analysis (1 arc-minute. The new data extended the distribution of vector species to 10 new Texas counties. The models predicted that Triatoma gerstaeckeri has a large region of contiguous suitable habitat in the southern United States and México, T. lecticularia has a diffuse suitable habitat distribution along both coasts of the same region, and T. sanguisuga has a disjoint suitable habitat distribution along the coasts of the United States. The ecological risk is highest in south Texas. 2. Incidence-based relative risk was computed at the county level using the Bayesian Besag-York-Mollié model and post-1960 T. cruzi incidence data. This

  9. 77 FR 18738 - Texas Regulatory Program

    Science.gov (United States)

    2012-03-28

    ... improve operational efficiency. This document gives the times and locations that the Texas program and... location: Surface Mining and Reclamation Division, Railroad Commission of Texas, 1701 North Congress Avenue... available for you to read at the locations listed above under ADDRESSES. Texas proposes to revise its...

  10. The renewables portfolio standard in Texas: an early assessment

    International Nuclear Information System (INIS)

    Langniss, Ole; Wiser, Ryan

    2003-01-01

    Texas has rapidly emerged as one of the leading wind power markets in the United States. This development can be largely traced to a well-designed and carefully implemented renewables portfolio standard (RPS). The RPS is a new policy mechanism that has received increasing attention as an attractive approach to support renewable power generation. Though replacing existing renewable energy policies with an as-of-yet untested approach in the RPS is risky, early experience from Texas suggests that an RPS can effectively spur renewables development and encourage competition among renewable energy producers. Initial RPS targets in Texas were well exceeded by the end of 2001, with 915 MW of wind installed in that year alone. RPS compliance costs appear negligible with new wind projects reportedly contracted for well under 3(US) cents/kWh, in part as a result of a 1.7(US) cents/kWh production tax credit, an outstanding wind resource and an RPS that is sizable enough to drive project economies of scale. Obliged retail suppliers have been willing to enter into long-term contracts with renewable generators, reducing important risks for both the developer and the retail supplier. Finally, the country's first comprehensive renewable energy certificate program has been put into place to monitor and track RPS compliance

  11. 27 CFR 9.155 - Texas Davis Mountains.

    Science.gov (United States)

    2010-04-01

    ...) “Fort Davis, Texas,” 1985. (2) “Mount Livermore, Texas—Chihuahua,” 1985. (c) Boundary. The Texas Davis... follows Highway 166 in a southwesterly direction onto the Mt. Livermore, Texas-Chihuahua, U.S.G.S. map; (6... Grapevine Canyon on the Mt. Livermore, Texas-Chihuahua, U.S.G.S. map; (14) The boundary then proceeds in a...

  12. Use of trees by the Texas ratsnake (Elaphe obsoleta) in eastern Texas

    Science.gov (United States)

    Josh B. Pierce; Robert R. Fleet; Lance McBrayer; D. Craig Rudolph

    2008-01-01

    We present information on the use of trees by Elaphe obsoleta (Texas Ratsnake) in a mesic pine-hardwood forest in eastern Texas. Using radiotelemetry, seven snakes (3 females, 4 males) were relocated a total of 363 times from April 2004 to May 2005, resulting in 201 unique locations. Snakes selected trees containing cavities and used hardwoods and...

  13. Ready Texas: Stakeholder Convening. Proceedings Report

    Science.gov (United States)

    Intercultural Development Research Association, 2016

    2016-01-01

    With the adoption of substantial changes to Texas high school curricula in 2013 (HB5), a central question for Texas policymakers, education and business leaders, families, and students is whether and how HB5 implementation impacts the state of college readiness and success in Texas. Comprehensive research is needed to understand the implications…

  14. 77 FR 71344 - Texas: Final Authorization of State-initiated Changes and Incorporation by Reference of State...

    Science.gov (United States)

    2012-11-30

    ... adverse written comment on the codification of the Texas authorized RCRA program by the close of business... Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit...) introductory paragraph 40 CFR 270.42(a)(1) intro. 30 TAC 305.69(b)(1)(A), except for 40 CFR 270.42(a)(1)(i...

  15. Texas pavement preservation center four-year summary report.

    Science.gov (United States)

    2009-07-04

    The Texas Pavement Preservation Center (TPPC), in joint collaboration with the Center for Transportation Research (CTR) of the University of Texas at Austin and the Texas Transportation Institute (TTI) of Texas A&M University, promotes the use of pav...

  16. Site observational work plan for the UMTRA Project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy

  17. A Goal Programming Model for the Siting of Multilevel EMS Systems.

    Science.gov (United States)

    1980-03-01

    Management," unpublished Ph.D. thesis, University of Texas, Austin, Texas, 1971. -23- (11) Daskin , M. and E. Stern, " A Multiobjective Set Covering...GOAL PROGRAM4MING MODEL FOR THE SITING OF MULTILEVEL EMS SYSTE-ETC(U) UNM1AR 80 A CHARNES, J E STORBECK N000iA-75-C-569 WICLASSIFIED CCS-366 N...366 A GOAL PROGRAMMING MODEL FOR THE SITING OF MULTILEVEL EMS SYSTEMS by A . Charnes J. Storbeck March 1980 This project was partially supported by

  18. Area geological characterization report for the Palo Duro and Dalhart Basins, Texas

    International Nuclear Information System (INIS)

    1983-07-01

    The present state of knowledge of the geology, hydrogeology, and seismology of the Palo Duro and Dalhart basins is summarized as a basis for future siting studies for a high-level nuclear waste repository. Large portions of the Texas Panhandle, and especially the Palo Duro basin, have stable geologic conditions and a favorable evaporite stratigraphy that warrant further study. Five salt-bearing formations containing thick salt units are present within the basin. Salt beds appear to be persistent over wide areas, relatively flat lying and structurally undisturbed. Available hydrogeologic data suggest that favorable conditions for waste isolation are widespread. The level and rate of seismic activity are low throughout the Texas Panhandle. 335 references, 83 figures, 17 tables

  19. Site safety progress review of spent fuel central interim storage facility. Final report

    International Nuclear Information System (INIS)

    Gurpinar, A.; Serva, L.; Giuliani

    1995-01-01

    Following the request of the Czech Power Board (CEZ) and within the scope of the Technical Cooperation Project CZR/9/003, a progress review of the site safety of the Spent Fuel Central Interim Storage Facility (SFCISF) was performed. The review involved the first two stages of the works comprising the regional survey and identification of candidate sites for the underground and surface storage options. Five sites have been identified as a result of the previous works. The following two stages will involved the identification of the preferred candidate sites for the two options and the final site qualification. The present review had the purpose of assessing the work already performed and making recommendations for the next two stages of works

  20. LANL environmental restoration site ranking system: System description. Final report

    International Nuclear Information System (INIS)

    Merkhofer, L.; Kann, A.; Voth, M.

    1992-01-01

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides

  1. LANL environmental restoration site ranking system: System description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Merkhofer, L.; Kann, A.; Voth, M. [Applied Decision Analysis, Inc., Menlo Park, CA (United States)

    1992-10-13

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides.

  2. Distance Education Programs in Texas Community & Technical Colleges: Assessing Student Support Services in a Virtual Environment.

    Science.gov (United States)

    Luedtke, Cherry Beth

    This project evaluates the status of distance learning at 54 public, two-year community, and technical colleges in Texas. Data was collected from the Web sites of each of the institutions. The Web site data indicted that 44 of the colleges refer specifically to distance education courses offered. To assess what student support services are…

  3. 78 FR 27342 - Radio Broadcasting Services; Moran, Texas

    Science.gov (United States)

    2013-05-10

    ... Broadcasting Services; Moran, Texas AGENCY: Federal Communications Commission. ACTION: Proposed rule. SUMMARY... service at Moran, Texas. Channel 281A can be allotted at Moran, Texas, in compliance with the Commission's... parties should serve petitioner as follows: Katherine Pyeatt, 215 Cedar Springs Rd., 1605, Dallas, Texas...

  4. 76 FR 12283 - Texas: Final Authorization of State-initiated Changes and Incorporation by Reference of State...

    Science.gov (United States)

    2011-03-07

    ... written comment on the codification of the Texas authorized RCRA program by the close of business April 6.... 30 TAC 305.45(a)(8) intro.--(a)(8)(B).. 40 CFR 270.13(l) related. 30 TAC 305.50(a)(6) 40 CFR 270.17(b.... The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory...

  5. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities. Final report

    International Nuclear Information System (INIS)

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources

  6. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources.

  7. Spring migration of Northern Pintails from Texas and New Mexico, USA

    Science.gov (United States)

    Haukos, D.A.; Miller, M.R.; Orthmeyer, D.L.; Takekawa, John Y.; Fleskes, J.P.; Casazza, Michael L.; Perry, W.M.; Moon, J.A.

    2006-01-01

    We used satellite transmitters (platform transmitting terminals or PTTs) during 2002 and 2003 to document spring migration timing, routes, stopover sites, and nesting sites of adult female Northern Pintails (Anas acuta) from major wintering areas of the Gulf Coast (N = 20) and Playa Lakes Regions (PLR, N = 20) in Texas, and the Middle Rio Grande Valley, New Mexico (MRGV, N = 15). Some Pintails tagged in the MRGV continued movements into Mexico. Poor winter survival or PTT failure reduced sample size to 15 for PLR Pintails, 5 for Gulf Coast Pintails, and 11 for MRGV Pintails. Apparent winter survival was 66% lower for Texas Gulf Coast PTT-tagged Pintails than for those from the PLR and MRGV. Pintails from each area used different routes to their respective breeding grounds. PTT-tagged Pintails from the MRGV followed the Rio Grande Valley north to southern Colorado, before traveling on to the Dakotas and Canada or traveled northeast and joined the migration of PLR Pintails in Texas or Kansas. The latter made initial stops in Kansas, Nebraska, Colorado, or the Dakotas. Gulf Coast Pintails traveled through north-central Oklahoma or central Kansas. Pintails that had stopped first in Kansas or Nebraska tended to settle to nest in the United States. Wetland availability in the Prairie Pothole Region of the Northern Great Plains influenced nesting destinations of PTT-tagged Pintails, but individuals settled across a wide swath of northern North America. We did not detect any consistently-used spring staging areas. Therefore, negative impacts to any of the marked populations, or their wetland habitats, may have continental implications.

  8. Final covering of the Ronneburg uranium mining site

    International Nuclear Information System (INIS)

    Hoepfner, Uwe

    2007-01-01

    The rehabilitation of WISMUT's former Ronneburg uranium mining site involves backfilling of waste rock to the Lichtenberg open pit. The relocation project comprises about 110 million m 3 of sulphide-bearing and AMD-generating waste rock which makes it the most important and most cost-intensive single surface restoration project conducted by WISMUT at the Ronneburg site. The backfilled waste rock has to be covered on an area of about 220 ha to control water infiltration and gas diffusion. Design planning for the final cover placement which began in 2004 had to be based on a comprehensive cost-benefit analysis as well on field tests of alternative cover options which are in compliance with legal requirements. An intensive testing program concerning the vadose zone of soil covers has therefore been started in 2000. The paper presents an overview of the monitoring program and the results of the vadose zone measurements. The water of soil covers have to be predicted for extended evaluation periods. Therefore water balance simulations of single layer covers (storage and evaporation concept) taking current and future soil and climate conditions into account are performed with the HYDRUS 2D code. (author)

  9. Siting of a low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    Alvarado, R.A.

    1983-01-01

    The Texas Low-Level Radioactive Waste Disposal Authority was established by the 67th Legislature to assure safe and effective disposal of the state's low-level radioactive waste. The Authority operates under provisions of the Texas Low-Level Radioactive Waste Disposal Authority Act, VACS 4590f-1. In Texas, low-level radioactive waste is defined as any radioactive material that has a half-life of 35 years or less or that has less than 10 nanocuries per gram of transuranics, and may include radioactive material not excluded by this definition with a half-life or more than 35 years if special disposal criteria are established. Prior to beginning the siting study, the Authority developed both exclusionary and inclusionary criteria. Major requirements of the siting guidelines are that the site shall be located such that it will not interfere with: (1) existing or near-future industrial use, (2) sensitive environmental and ecological areas, and (3) existing and projected population growth. Therefore, the site should be located away from currently known recoverable mineral, energy and water resources, population centers, and areas of projected growth. This would reduce the potential for inadvertent intruders, increasing the likelihood for stability of the disposal site after closure. The identification of potential sites for disposal of low-level radioactive waste involves a phased progression from statewide screening to site-specific exploration, using a set of exclusionary and preferential criteria to guide the process. This methodology applied the criteria in a sequential manner to focus the analysis on progressively smaller and more favorable areas. The study was divided into three phases: (1) statewide screening; (2) site identification; and (3) preliminary site characterization

  10. 9 CFR 72.5 - Area quarantined in Texas.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Area quarantined in Texas. 72.5... AGRICULTURE INTERSTATE TRANSPORTATION OF ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS TEXAS (SPLENETIC) FEVER IN CATTLE § 72.5 Area quarantined in Texas. The area quarantined in Texas is the quarantined area...

  11. Technical Training seminar: Texas Instruments

    CERN Multimedia

    2006-01-01

    Monday 6 November TECHNICAL TRAINING SEMINAR 14:00 to 17:30 - Training Centre Auditorium (bldg. 593) Texas Instruments Technical Seminar Michael Scholtholt, Field Application Engineer / TEXAS INSTRUMENTS (US, D, CH) POWER - A short approach to Texas Instruments power products Voltage mode vs. current mode control Differentiating DC/DC converters by analyzing control and compensation schemes: line / load regulation, transient response, BOM, board space, ease-of-use Introduction to the SWIFT software FPGA + CPLD power solutions WIRELESS / CHIPCON Decision criteria when choosing a RF platform Introduction to Texas Instruments wireless products: standardized platforms proprietary platforms ( 2.4 GHz / sub 1 GHz) development tools Antenna design: example for 2.4 GHz questions, discussion Industrial partners: Robert Medioni, François Caloz / Spoerle Electronic, CH-1440 Montagny (VD), Switzerland Phone: +41 24 447 0137, email: RMedioni@spoerle.com, http://www.spoerle.com Language: English. Free s...

  12. The State of Texas Children: Texas KIDS COUNT Annual Data Book--The Importance of Investing in Children

    Science.gov (United States)

    Deviney, Frances; Phillips, Pace; Dickerson, Carrie; Tibbitt, Laura

    2011-01-01

    On February 4, the Center for Public Policy Priorities (CPPP) released the 18th annual Texas KIDS COUNT data book, "The State of Texas Children 2011." The annual data book and free data warehouse provide the latest look at more than 80 different measures of child well-being in Texas and every county in the state. This year, the opening…

  13. Evaporite-hosted native sulfur in Trans-Pecos Texas: Relation to late-phase basin and range deformation

    International Nuclear Information System (INIS)

    Hentz, T.F.; Henry, C.D.

    1989-01-01

    Major deposits of biogenic native sulfur are associated with narrow, northeast-trending grabens and normal faults that disrupt the gently tilted, east-dipping Upper Permian evaporite succession of the western Delaware Basin in Trans-Pecos Texas. Orebodies are restricted to geologic traps in the fractured and dissolution-modified downfaulted blocks of the grabens. Other parallel, regionally distributed grabens and normal faults are commonly the sites of noncommercial sulfur deposits and genetically related secondary-replacement (diagenetic) limestone bodies. The sulfur-bearing structures probably formed during the later of two episodes of Basin and Range extension that have not previously been differentiated in Texas but are well defined elsewhere in the western United States. In Texas several lines of evidence collectively support the existence of late-phase, northwest-directed extension that was initiated in the middle Miocene

  14. Well completion report - G. Friemel No. 1 (PD-5) well, Palo Duro Basin, Texas: unanalyzed data

    International Nuclear Information System (INIS)

    1984-05-01

    This report provides a brief description and history of the drilling and testing program conducted at the G. Friemel No. 1 well, located in eastern Deaf Smith County about 4 miles north of Dawn, Texas. Drilling and testing were performed by Stone and Webster Engineering Corporation as a part of a nationwide program to identify potential locations for a nuclear waste repository. Figures showing site layout and final well design are provided. Testing programs are described, and stratigraphic data derived from the well are summarized. Data derived from geophysical well logs, drill-stem tests, and other testing programs are presented in the appendixes. Drilling of the well started on February 23, 1982, and was completed on March 31, 1982, at a total depth of 2710 feet. These data are preliminary. They have been neither analyzed nor evaluated

  15. CBTE: The Ayes of Texas

    Science.gov (United States)

    Houston, W. Robert; Howsam, Robert B.

    1974-01-01

    A heated controversy occurred when the Texas State Board of Education mandated competency based teacher education (CBTE) for all of the State's 66 teacher preparatory institutions. This is an account of developments in Texas by two major proponents of CBTE. (Author/JF)

  16. Alternative methods to manage waste salt from repository excavation in the Deaf Smith County and Swisher County locations, Texas: A scoping study: Technical report

    International Nuclear Information System (INIS)

    1987-01-01

    This report describes and qualitatively evaluates eight options for managing the large volumes of salt and salt-laden rock that would result from the excavation of a high-level radioactive waste repository in Deaf Smith County or Swisher County, Texas. The options are: distribution for commercial use; ocean disposal; deep-well injection; disposal in multilevel mines on the site; disposal in abandoned salt mines off the site; disposal off the site in abandoned mines developed for minerals other than salt; disposal in excavated landfills; and surface disposal on alkali flats. The main features of each option are described, as well as the associated environmental and economic impacts, and regulatory constraints. The options are evaluated in terms of 11 factors that jointly constitute a test of relative suitability. The results of the evaluation and implications for further study are indicated. This document does not consider or include the actual numbers, findings, or conclusions contained in the final Deaf Smith County Environmental Assessment (DOE, 1986). 43 refs., 8 tabs

  17. Hazardous waste sites and housing appreciation rates

    OpenAIRE

    McCluskey, Jill Jennifer; Rausser, Gordon C

    2000-01-01

    The dynamic effect of a hazardous waste site is analyzed by investigating the causal relationship between housing appreciation rates and house location in relation to a hazardous waste site using resale data from individual sales transactions in Dallas County, Texas. The results indicate that in the period in which the hazardous waste site was identified and cleanup occurred, residential property owners in close proximity to the hazardous waste site experienced lower housing appreciation rate...

  18. The Demographics of Corporal Punishment in Texas

    Science.gov (United States)

    Phillips, Stephanie

    2012-01-01

    This dissertation examined the student discipline policies of 1,025 Texas school districts, as well as data from the Texas Education Agency's Academic Excellence Indicator System in order to identify demographic patterns regarding corporal punishment policies in Texas schools. The study also studied the relationship between a district's corporal…

  19. 40 CFR 81.344 - Texas.

    Science.gov (United States)

    2010-07-01

    ... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.344 Texas. Texas... County, Deaf Smith County, Dickens County, Donley County, Floyd County, Garza County, Gray County, Hale..., Cochran County, Collingsworth County, Crosby County, Dallam County, Deaf Smith County, Dickens County...

  20. The Texas A&M Radioisotope Production and Radiochemistry Program

    International Nuclear Information System (INIS)

    Akabani, Gamal

    2016-01-01

    The main motivation of the project at Texas A&M University was to carry out the production of critically needed radioisotopes used in medicine for diagnostics and therapy, and to establish an academic program in radionuclide production and separation methods. After a lengthy battle with the Texas A&M University Radiation Safety Office, the Texas Department of State Health Services granted us a license for the production of radionuclides in July 2015, allowing us to work in earnest in our project objectives. Experiments began immediately after licensing, and we started the assembly and testing of our target systems. There were four analytical/theoretical projects and two experimental target systems. These were for At-211 production and for Zn-62/Cu-62 production. The theoretical projects were related to the production of Mo-99/Tc-99m using a) a subcritical aqueous target system and b) production of Tc-99m from accelerator-generated Mo-99 utilizing a photon-neutron interaction with enriched Mo-100 targets. The two experimental projects were the development of targetry systems and production of At-211 and Zn-62/Cu-62 generator. The targetry system for At-211 has been tested and production of At-211 is chronic depending of availability of beam time at the cyclotron. The installation and testing of the targetry system for the production of Zn-62/Cu-62 has not been finalized. A description of the systems is described. The academic program in radionuclide production and separation methods was initiated in the fall of 2011 and, due to the lack of a radiochemistry laboratory, it was suspended. We expect to re-start the academic program at the Texas A&M Institute for Preclinical Studies under the Molecular Imaging Program.

  1. The Texas A&M Radioisotope Production and Radiochemistry Program

    Energy Technology Data Exchange (ETDEWEB)

    Akabani, Gamal [Texas A & M Univ., College Station, TX (United States)

    2016-08-31

    The main motivation of the project at Texas A&M University was to carry out the production of critically needed radioisotopes used in medicine for diagnostic and therapy, and to establish an academic program in radionuclide production and separation methods. After a lengthy battle with the Texas A&M University Radiation Safety Office, the Texas Department of State Health Services granted us a license for the production of radionuclides in July 2015, allowing us to work in earnest in our project objectives. Experiments began immediately after licensing, and we started the assembly and testing of our target systems. There were four analytical/theoretical projects and two experimental target systems. These were for At-211 production and for Zn- 62/Cu-62 production. The theoretical projects were related to the production of Mo-99/Tc-99m using (a) a subcritical aqueous target system and (b) production of Tc-99m from accelerator-generated Mo-99 utilizing a photon-neutron interaction with enriched Mo-100 targets. The two experimental projects were the development of targetry systems and production of At-211 and Zn-62/Cu-62 generator. The targetry system for At-211 has been tested and production of At-211 is chronic depending of availability of beam time at the cyclotron. The installation and testing of the targetry system for the production of Zn-62/Cu-62 has not been finalized. A description of the systems is described. The academic program in radionuclide production and separation methods was initiated in the fall of 2011; due to the lack of a radiochemistry laboratory, it was suspended. We expect to re-start the academic program at the Texas A&M Institute for Preclinical Studies under the Molecular Imaging Program.

  2. The Texas A&M Radioisotope Production and Radiochemistry Program

    International Nuclear Information System (INIS)

    Akabani, Gamal

    2016-01-01

    The main motivation of the project at Texas A&M University was to carry out the production of critically needed radioisotopes used in medicine for diagnostic and therapy, and to establish an academic program in radionuclide production and separation methods. After a lengthy battle with the Texas A&M University Radiation Safety Office, the Texas Department of State Health Services granted us a license for the production of radionuclides in July 2015, allowing us to work in earnest in our project objectives. Experiments began immediately after licensing, and we started the assembly and testing of our target systems. There were four analytical/theoretical projects and two experimental target systems. These were for At-211 production and for Zn- 62/Cu-62 production. The theoretical projects were related to the production of Mo-99/Tc-99m using (a) a subcritical aqueous target system and (b) production of Tc-99m from accelerator-generated Mo-99 utilizing a photon-neutron interaction with enriched Mo-100 targets. The two experimental projects were the development of targetry systems and production of At-211 and Zn-62/Cu-62 generator. The targetry system for At-211 has been tested and production of At-211 is chronic depending of availability of beam time at the cyclotron. The installation and testing of the targetry system for the production of Zn-62/Cu-62 has not been finalized. A description of the systems is described. The academic program in radionuclide production and separation methods was initiated in the fall of 2011; due to the lack of a radiochemistry laboratory, it was suspended. We expect to re-start the academic program at the Texas A&M Institute for Preclinical Studies under the Molecular Imaging Program.

  3. The Texas A&M Radioisotope Production and Radiochemistry Program

    Energy Technology Data Exchange (ETDEWEB)

    Akabani, Gamal [Texas A & M Univ., College Station, TX (United States). Dept. of Nuclear Engineering. Dept. of Veterinary Integrative Biosciences

    2016-10-28

    The main motivation of the project at Texas A&M University was to carry out the production of critically needed radioisotopes used in medicine for diagnostics and therapy, and to establish an academic program in radionuclide production and separation methods. After a lengthy battle with the Texas A&M University Radiation Safety Office, the Texas Department of State Health Services granted us a license for the production of radionuclides in July 2015, allowing us to work in earnest in our project objectives. Experiments began immediately after licensing, and we started the assembly and testing of our target systems. There were four analytical/theoretical projects and two experimental target systems. These were for At-211 production and for Zn-62/Cu-62 production. The theoretical projects were related to the production of Mo-99/Tc-99m using a) a subcritical aqueous target system and b) production of Tc-99m from accelerator-generated Mo-99 utilizing a photon-neutron interaction with enriched Mo-100 targets. The two experimental projects were the development of targetry systems and production of At-211 and Zn-62/Cu-62 generator. The targetry system for At-211 has been tested and production of At-211 is chronic depending of availability of beam time at the cyclotron. The installation and testing of the targetry system for the production of Zn-62/Cu-62 has not been finalized. A description of the systems is described. The academic program in radionuclide production and separation methods was initiated in the fall of 2011 and, due to the lack of a radiochemistry laboratory, it was suspended. We expect to re-start the academic program at the Texas A&M Institute for Preclinical Studies under the Molecular Imaging Program.

  4. Multispectral image analysis of the Palo Duro Basin, Texas: Final report

    International Nuclear Information System (INIS)

    Andre, C.G.

    1986-09-01

    The objectives of this remote sensing study of the Palo Duro Basin are to: (1) detect the surface expression of regional subsurface structure; (2) locate previously unrecognized fractures; (3) interpret the data in terms of the geologic history of the Palo Duro Basin. Linear and circular surface features were mapped from Landsat 4 Thematic Mapper and NOAA-7 Advanced Very High Resolution Radiometer digital images of visible, near-infrared and thermal infrared bands. The density and orientation of features mapped are shown to be related to geological features, such as faults, structural arches, paleoerosion topography and salt dissolution zones. The approximate area covered by the three 185 km /times/ 170 km Thematic Mapper images studied extends southward from the Canadian River Breaks to the Sand Hills and eastward from the western Mountains in Oklahoma. The day and night thermal infrared images from the NOAA-7 satellite encompass an area that includes the northern half of Texas and most of the surrounding states to the east, west and north. 4 refs

  5. Texas Real Estate Curriculum Workshop Summary Report.

    Science.gov (United States)

    Lyon, Robert

    The Texas Real Estate Research Center-Texas Education Agency (TRERC-TEA) curriculum workshop was attended by over 40 participants representing 26 Texas community colleges. These participants divided into eight small groups by real estate specialty area and developed curriculum outlines and learning objectives for the following real estate courses:…

  6. Discharge between San Antonio Bay and Aransas Bay, southern Gulf Coast, Texas, May-September 1999

    Science.gov (United States)

    East, Jeffery W.

    2001-01-01

    Along the Gulf Coast of Texas, many estuaries and bays are important habitat and nurseries for aquatic life. San Antonio Bay and Aransas Bay, located about 50 and 30 miles northeast, respectively, of Corpus Christi, are two important estuarine nurseries on the southern Gulf Coast of Texas (fig. 1). According to the Texas Parks and Wildlife Department, “Almost 80 percent of the seagrasses [along the Texas Gulf Coast] are located in the Laguna Madre, an estuary that begins just south of Corpus Christi Bay and runs southward 140 miles to South Padre Island. Most of the remaining seagrasses, about 45,000 acres, are located in the heavily traveled San Antonio, Aransas and Corpus Christi Bay areas” (Shook, 2000).Population growth has led to greater demands on water supplies in Texas. The Texas Water Development Board, the Texas Parks and Wildlife Department, and the Texas Natural Resource Conservation Commission have the cooperative task of determining inflows required to maintain the ecological health of the State’s streams, rivers, bays, and estuaries. To determine these inflow requirements, the three agencies collect data and conduct studies on the need for instream flows and freshwater/ saline water inflows to Texas estuaries.To assist in the determination of freshwater inflow requirements, the U.S. Geological Survey (USGS), in cooperation with the Texas Water Development Board, conducted a hydrographic survey of discharge (flow) between San Antonio Bay and Aransas Bay during the period May–September 1999. Automated instrumentation and acoustic technology were used to maximize the amount and quality of data that were collected, while minimizing personnel requirements. This report documents the discharge measured at two sites between the bays during May–September 1999 and describes the influences of meteorologic (wind and tidal) and hydrologic (freshwater inflow) conditions on discharge between the two bays. The movement of water between the bays is

  7. National Register Testing of 19 Prehistoric Archeological Sites on Fort Hood, Texas: The 1995 Season

    Science.gov (United States)

    1999-07-01

    arboreal species include ash (Fraxinus sp.), redbud (Cercis canadensis), hack- berry (Celtis sp.), Texas persimmon ( Diospyros texana), and Mexican...from flotation of hearth fill were identified as Celtis sp. nutlets, woody legume, Rosaceae wood, and Diospyros virginiana wood, the latter...early 1990s. For consistency, all of their studies have focused on a single genus , Rabdotus sp., that is abundant in the archeological deposits at

  8. 40 CFR 81.429 - Texas.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Texas. 81.429 Section 81.429 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DESIGNATION OF... Visibility Is an Important Value § 81.429 Texas. Area name Acreage Public Law establishing Federal land...

  9. Hydrologic, Water-Quality, and Biological Data for Three Water Bodies, Texas Gulf Coast Plain, 2000-2002

    National Research Council Canada - National Science Library

    East, Jeffery W; Hogan, Jennifer L

    2003-01-01

    During July 2000 September 2002, the U.S. Geological Survey collected and analyzed site-specific hydrologic, water-quality, and biological data in Dickinson Bayou, Armand Bayou, and the San Bernard River in the Gulf Coastal Plain of Texas...

  10. Red-shouldered hawk nesting habitat preference in south Texas

    Science.gov (United States)

    Strobel, Bradley N.; Boal, Clint W.

    2010-01-01

    We examined nesting habitat preference by red-shouldered hawks Buteo lineatus using conditional logistic regression on characteristics measured at 27 occupied nest sites and 68 unused sites in 2005–2009 in south Texas. We measured vegetation characteristics of individual trees (nest trees and unused trees) and corresponding 0.04-ha plots. We evaluated the importance of tree and plot characteristics to nesting habitat selection by comparing a priori tree-specific and plot-specific models using Akaike's information criterion. Models with only plot variables carried 14% more weight than models with only center tree variables. The model-averaged odds ratios indicated red-shouldered hawks selected to nest in taller trees and in areas with higher average diameter at breast height than randomly available within the forest stand. Relative to randomly selected areas, each 1-m increase in nest tree height and 1-cm increase in the plot average diameter at breast height increased the probability of selection by 85% and 10%, respectively. Our results indicate that red-shouldered hawks select nesting habitat based on vegetation characteristics of individual trees as well as the 0.04-ha area surrounding the tree. Our results indicate forest management practices resulting in tall forest stands with large average diameter at breast height would benefit red-shouldered hawks in south Texas.

  11. Recent Seismicity in Texas and Research Design and Progress of the TexNet-CISR Collaboration

    Science.gov (United States)

    Hennings, P.; Savvaidis, A.; Rathje, E.; Olson, J. E.; DeShon, H. R.; Datta-Gupta, A.; Eichhubl, P.; Nicot, J. P.; Kahlor, L. A.

    2017-12-01

    The recent increase in the rate of seismicity in Texas has prompted the establishment of an interdisciplinary, interinstitutional collaboration led by the Texas Bureau of Economic Geology which includes the TexNet Seismic Monitoring and Research project as funded by The State of Texas (roughly 2/3rds of our funding) and the industry-funded Center for Integrated Seismicity Research (CISR) (1/3 of funding). TexNet is monitoring and cataloging seismicity across Texas using a new backbone seismic network, investigating site-specific earthquake sequences by deploying temporary seismic monitoring stations, and conducting reservoir modeling studies. CISR expands TexNet research into the interdisciplinary realm to more thoroughly study the factors that contribute to seismicity, characterize the associated hazard and risk, develop strategies for mitigation and management, and develop methods of effective communication for all stakeholders. The TexNet-CISR research portfolio has 6 themes: seismicity monitoring, seismology, geologic and hydrologic description, geomechanics and reservoir modeling, seismic hazard and risk assessment, and seismic risk social science. Twenty+ specific research projects span and connect these themes. We will provide a synopsis of research progress including recent seismicity trends in Texas; Fort Worth Basin integrated studies including geological modeling and fault characterization, fluid injection data syntheses, and reservoir and geomechanical modeling; regional ground shaking characterization and mapping, infrastructure vulnerability assessment; and social science topics of public perception and information seeking behavior.

  12. EXECUTIVE SUMMARY OF STATE DATA RELATED TO ABANDONED CENTRALIZED AND COMMERCIAL DRILLING-FLUID DISPOSAL SITES IN LOUISIANA, NEW MEXICO, OKLAHOMA, AND TEXAS

    Energy Technology Data Exchange (ETDEWEB)

    H. Seay Nance

    2003-03-01

    This 2003 Spring Semi-Annual Report contains a summary of the Final Technical Report being prepared for the Soil Remediation Requirements at Commercial and Centralized Drilling-Fluid Disposal (CCDD) Sites project funded by the United States Department of Energy under DOE Award No. DE-AC26-99BC15225. The summary describes (1) the objectives of the investigation, (2) a rationale and methodology of the investigation, (3) sources of data, assessment of data quality, and data availability, (4) examples of well documented centralized and commercial drilling-fluid disposal (CCDD) sites and other sites where drilling fluid was disposed of, and (5) examples of abandoned sites and measures undertaken for their assessment and remediation. The report also includes most of the figures, tables, and appendices that will be included in the final report.

  13. Earthtech, Dig-Texas and Upward Bound: Outreach to At-Risk Students with Interdisciplinary STEM Activities

    Science.gov (United States)

    Olgin, J. G.; Güereque, M.; Pennington, D. D.; Everett, A.; Dixon, J. G.; Reyes, A.; Houser, P. I. Q.; Baker, J. A.; Stocks, E.; Ellins, K.

    2015-12-01

    The Geological Sciences department at the University of Texas at El Paso (UTEP) hosted the EarthTech outreach program - a one-week intensive summer camp for low-income, at-risk high school students. The EarthTech program engaged students in STEM activities from geological and environmental sciences. Developed and led by university student-mentors with guidance from a supervising faculty member, the course engaged Upward Bound students with lectures, interactive projects, and excursions to local ecological preserves and geological sites around El Paso, Texas. Topics covered plant and animal distribution and diversity, water and soil dynamics, evolution and paleontology, geohazards, and planetary science. Field trips were combined with hands-on activities, including activities from DIG Texas teaching modules. The NSF-funded DIG Texas Instructional Blueprints project is organizing vetted, high quality online educational resources and learning activities into teaching modules. The modules follow a storyline and demonstrate congruency with the Next Generation Science Standards. Selected DIG Texas resources were included in the daily curriculum to complement the field trip and other hands-on activities. EarthTech students created ESRI Online GIS story maps in which they showed the locations of the field trips, incorporated photographs they had taken, and provided written reflections about their camp experiences. The DIG Texas project evaluation collected survey and interview data from the university student mentors throughout the week to ascertain the efficacy of the program. This poster presentation will include an overview of the program, including examples of work and evaluation results.

  14. 76 FR 7833 - Texas Eastern Transmission, LP; Notice of Application

    Science.gov (United States)

    2011-02-11

    ...] Texas Eastern Transmission, LP; Notice of Application Take notice that on January 25, 2011, Texas Eastern Transmission, LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056, filed in the above... TEAM 2012 Project. Specifically, Texas Eastern requests: (i) Authorization under NGA sections 7(b) and...

  15. Overview of ONWI'S Salt site selection program

    International Nuclear Information System (INIS)

    Madia, W.J.

    1983-01-01

    In the past year, activities in the salt site selection program of the Office of Nuclear Waste Isolation (ONWI) have focused on narrowing the number and size of areas under consideration as candidate repository sites. The progressive focusing is illustrated. Bedded salt, in the Permian Basin of West Texas and the Paradox Basin of Utah, and salt domes in the Gulf Coast Salt Dome Region (including parts of East Texas, Louisiana, and Mississippi) have been the subjects of geologic, environmental, and socioeconomic characterization of progressively greater detail as the screening process has proceeded. Detailed, field-oriented research and testing have superceded broad-based studies relying heavily on literature and other existing data. Coinciding with the increased field activities has been the publication of results and recommendations resulting from earlier program efforts

  16. Species Distribution Model for Management of an Invasive Vine in Forestlands of Eastern Texas

    Directory of Open Access Journals (Sweden)

    Hsiao-Hsuan Wang

    2015-11-01

    Full Text Available Invasive plants decrease biodiversity, modify vegetation structure, and inhibit growth and reproduction of native species. Japanese honeysuckle (Lonicera japonica Thunb. is the most prevalent invasive vine in the forestlands of eastern Texas. Hence, we aimed to identify potential factors influencing the distribution of the species, quantify the relative importance of each factor, and test possible management strategies. We analyzed an extensive dataset collected as part of the Forest Inventory and Analysis Program of the United States Department of Agriculture (USDA Forest Service to quantify the range expansion of Japanese honeysuckle in the forestlands of eastern Texas from 2006 to 2011. We then identified potential factors influencing the likelihood of presence of Japanese honeysuckle using boosted regression trees. Our results indicated that the presence of Japanese honeysuckle on sampled plots almost doubled during this period (from 352 to 616 plots, spreading extensively, geographically. The probability of invasion was correlated with variables representing landscape conditions, climatic conditions, forest features, disturbance factors, and forest management activities. Habitats most at risk to invasion under current conditions occurred primarily in northeastern Texas, with a few invasion hotspots in the south. Estimated probabilities of invasion were reduced most by artificial site regeneration, with habitats most at risk again occurring primarily in northeastern Texas.

  17. The renewables portfolio standard in Texas: An early assessment; TOPICAL

    International Nuclear Information System (INIS)

    Wiser, Ryan H.; Langniss, Ole

    2001-01-01

    Texas has rapidly emerged as one of the leading wind power markets in the United States. This development can be largely traced to a well-designed and carefully implemented renewables portfolio standard (RPS). The RPS is a new policy mechanism that has received increasing attention as an attractive approach to support renewable power generation. Though replacing existing renewable energy policies with an as-of-yet largely untested approach in the RPS is risky, early experience from Texas suggests that an RPS can effectively spur renewables development and encourage competition among renewable energy producers. Initial RPS targets in Texas will be far exceeded by the end of 2001, with as much as 930 MW of wind slated for installation this year. RPS compliance costs appear negligible, with new wind projects reportedly contracted for under 3(US)/242/kWh, in part as a result of a 1.7(US)/242/kWh production tax credit, an outstanding wind resource, and an RPS that is sizable enough to drive project economies of scale. Obliged retail suppliers have been willing to enter into long-term contracts with renewable generators, reducing important risks for both the developer and the retail supplier. Finally, the country's first comprehensive renewable energy certificate program has been put into place to monitor and track RPS compliance

  18. 78 FR 12010 - Radio Broadcasting Services; Pearsall, Texas

    Science.gov (United States)

    2013-02-21

    ... Broadcasting Services; Pearsall, Texas AGENCY: Federal Communications Commission. ACTION: Proposed rule... (``Petitioner''), licensee of FM Station KSAG, Channel 277A, Pearsall, Texas. Petitioner proposes to amend the... be allotted at Pearsall, Texas, in compliance with the Commission's minimum distance separation...

  19. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    International Nuclear Information System (INIS)

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE

  20. Texas, 2008 forest inventory and analysis factsheet

    Science.gov (United States)

    James Bentley

    2011-01-01

    This science update summarizes the findings of the first statewide annual inventory conducted by the Southern Forest Inventory and Analysis (FIA) Program in cooperation with the Texas Forest Service of the forest resource attributes in Texas. The 254 counties of Texas are consolidated into seven FIA survey units—southeast (unit 1), the northeast (unit 2), the north...

  1. Texas, 2010 forest inventory and analysis factsheet

    Science.gov (United States)

    James W. Bentley

    2012-01-01

    This science update summarizes the findings of the statewide annual inventory conducted by the Southern Forest Inventory and Analysis (FIA) Program in cooperation with the Texas Forest Service of the forest resource attributes in Texas. The 254 counties of Texas are consolidated into seven FIA survey units – southeast (unit 1), northeast (unit 2), north central (unit 3...

  2. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    International Nuclear Information System (INIS)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE's satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson

  3. Soil and Nutrient Loss Following Site Preparation Burning

    Science.gov (United States)

    J.P. Field; E.A. Carter

    2000-01-01

    Sediment loss and nutrient cpncentrations in runoff were evaluated to determine the effects of site preparation burning on a recently harvested loblolly pine (Pinus taeda L.) site in east Texas. Sediment and nutrient losses prior to treatment were approximately the same from control plots and pretreatment burn plots. Nutrient analysis of runoff...

  4. Response report from US Department of Energy Hearings on proposed salt site nominations

    International Nuclear Information System (INIS)

    1983-11-01

    As required by the Nuclear Waste Policy Act (US Congress, 1983, Pub. L. 97-425, Section 112(b) (2)), the US Department of Energy (DOE) conducted a series of nine formal public hearings during April and May 1983, in Louisiana, Mississippi, Texas, and Utah and in the state capitals of Mississippi, Texas, and Utah. The hearings were held in local communities in the vicinity of sites identified as potentially suitable for further study in the program to select a site for the nation's first repository for high-level nuclear waste. The public hearings for potential sites in salt focused on the proposed nomination of the Vacherie salt dome site in Louisiana; the Richton and Cypress Creek salt dome sites in Mississippi; the Deaf Smith County and Swisher County bedded salt sites in Texas; and the Davis and Lavender Canyon bedded salt sites in Utah. The oral and written comments made during the course of the nine formal public hearings were analyzed, paraphrased into almost 1100 comments, and grouped into 62 issues or subjects within the following nine major topical areas: National Waste Terminal Storage Program Planning Process, Consultation and Cooperation, Engineering/Repository Design, Geology, Hydrology, Transportation, Public Health and Safety, Environmental Quality, and Socioeconomics. This document provides general responses to each of the 62 major issues raised during the hearings. 137 references, 7 figures, 12 tables

  5. Response report from US Department of Energy hearings on proposed salt site nominations

    International Nuclear Information System (INIS)

    1983-11-01

    As required by the Nuclear Waste Policy Act (US Congress, 1983, Pub. L. 97-425, Section 112(b)(2)), the US Department of Energy (DOE) conducted a series of nine formal public hearings during April and May 1983, in Louisiana, Mississippi, Texas, and Utah and in the state capitals of Mississippi, Texas, and Utah. The hearings were held in local communities in the vicinity of sites identified as potentially suitable for further study in the program to select a site for the nation's first repository for high-level nuclear waste. The public hearings for potential sites in salt focused on the proposed nomination of the Vacherie salt dome site in Louisiana; the Richton and Cypress Creek salt dome sites in Mississippi; the Deaf Smith County and Swisher County bedded salt sites in Texas; and the Davis and Lavender Canyon bedded salt sites in Utah. The oral and written comments made during the course of the nine formal public hearings were analyzed, paraphrased into almost 1100 comments, and grouped into 62 issues or subjects within the following nine major topical areas: National Waste Terminal Storage program Planning Process, Consultation and Cooperation, Engineering/Repository Design, Geology, Hydrology, Transportation, Public Health and Safety, Environmental Quality, and Socioeconomics. This document provides general responses to each of the 62 major issues raised during the hearings

  6. Aerobiology of Juniperus Pollen in Oklahoma, Texas, and New Mexico

    Science.gov (United States)

    Levetin, Estelle; Bunderson, Landon; VandeWater, Pete; Luvall, Jeff

    2014-01-01

    Pollen from members of the Cupressaceae are major aeroallergens in many parts of the world. In the south central and southwest United States, Juniperus pollen is the most important member of this family with J. ashei (JA) responsible for severe winter allergy symptoms in Texas and Oklahoma. In New Mexico, pollen from J. monosperma (JM) and other Juniperus species are important contributors to spring allergies, while J. pinchotii (JP) pollinates in the fall affecting sensitive individuals in west Texas, southwest Oklahoma and eastern New Mexico. Throughout this region, JA, JM, and JP occur in dense woodland populations. Generally monitoring for airborne allergens is conducted in urban areas, although the source for tree pollen may be forested areas distant from the sampling sites. Improved pollen forecasts require a better understanding of pollen production at the source. The current study was undertaken to examine the aerobiology of several Juniperus species at their source areas for the development of new pollen forecasting initiatives.

  7. Clean Energy Technology Incubator Initiative Launched in Texas

    Science.gov (United States)

    - including the State Energy Conservation Office, the General Land Office, the Texas Natural Resources Conservation Commission, the Texas Energy Coordination Council and the Texas Department of Economic Development from market entry. The alliance is interested in a broad range of company types, from technology-based

  8. 76 FR 13209 - United States and State of Texas v. United Regional Health Care System; Proposed Final Judgment...

    Science.gov (United States)

    2011-03-10

    ... of Texas v. United Regional Health Care System, Civil Action No. 7:11-cv- 00030-O. On February 25..., ambulatory surgery center or radiology center in [a] 15 mile radius of United Regional Health Care System... 95% of billed charges for all inpatient and outpatient services at United Regional Health Care System...

  9. Forests of East Texas, 2014

    Science.gov (United States)

    Thomas J. Brandeis

    2015-01-01

    This resource update provides an overview of forest resources in east Texas derived from an inventory conducted by the U.S. Forest Service, Forest Inventory and Analysis (FIA) Program at the Southern Research Station in cooperation with the Texas A&M Forest Service. These estimates are based on field data collected using the FIA annualized sample design and are...

  10. Forests of east Texas, 2013

    Science.gov (United States)

    K.J.W. Dooley; T.J. Brandeis

    2014-01-01

    This resource update provides an overview of forest resources in east Texas based on an inventory conducted by the U.S. Forest Service, Forest Inventory and Analysis (FIA) program at the Southern Research Station in cooperation with the Texas A&M Forest Service. Forest resource estimates are based on field data collected using the FIA annualized sample design and...

  11. The Texas Ten Percent Plan's Impact on College Enrollment

    Science.gov (United States)

    Daugherty, Lindsay; Martorell, Paco; McFarlin, Isaac, Jr.

    2014-01-01

    The Texas Ten Percent Plan (TTP) provides students in the top 10 percent of their high-school class with automatic admission to any public university in the state, including the two flagship schools, the University of Texas at Austin and Texas A&M. Texas created the policy in 1997 after a federal appellate court ruled that the state's previous…

  12. Design principle of TVO's final repository and preliminary adaptation to site specific conditions

    International Nuclear Information System (INIS)

    Salo, J-P.; Reikkola, R.

    1995-01-01

    Teollisuuden Voima Oy (TVO) is responsible for the management of spent fuel produced by the Olkiluoto power plant. TVO's current programme of spent fuel management is based on the guidelines and time schedule set by the Finnish Government. TVO has studied a final disposal concept in which the spent fuel bundles are encapsulated in copper canisters and emplaced in Finnish bedrock. According to the plan the final repository for spent fuel will be in operation by 2020. TVO's updated technical plans for the disposal of spent fuel together with a performance analysis (TVO-92) were submitted to the authorities in 1992. The paper describes the design principle of TVO's final repository and preliminary adaptation of the repository to site specific conditions. (author). 10 refs., 5 figs

  13. Precipitation and Evaporation Trends in Texas

    Science.gov (United States)

    Dixon, R. W.

    2009-05-01

    Texas is a large land area with at least three different climate types. As such it is expected that the results of climate change will not be homogenous. This paper presents results of a study of long trends in Texas precipitation and evaporation using data from the US Historical Climatology Network and the Texas Water Development Board. It shows that the long term trends of these variables is not homogenous and exhibits great variability in both spatial extent and magnitude. This variability must be considered in planning for future water supply or other mitigation projects.

  14. Disposal alternatives and recommendations for waste salt management for repository excavation in the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    1987-01-01

    This report documents an evaluation of five alternatives for the disposal of waste salt that would be generated by the construction of a repository for radioactive waste in underground salt deposits at either of two sites in the Palo Duro Basin, Texas. The alternatives include commercial disposal, offsite deep-well injection, disposal in abandoned mines, ocean disposal, and land surface disposal on or off the site. For each alternative a reference case was rated - positive, neutral, or negative - in terms of environmental and dependability factors developed specifically for Texas sites. The factors constituting the environmental checklist relate to water quality impact, water- and land-use conflicts, ecological compatibility, conformity with air quality standards, and aesthetic impact. Factors on the dependability check-list relate to public acceptance, the adequacy of site characterization, permit and licensing requirements, technological requirements, and operational availability. A comparison of the ratings yielded the following viable alternatives, in order of preference: (1) land surface disposal, specifically disposal on tailings piles associated with abandoned potash mines; (2) disposal in abandoned mines, specifically potash mines; and (3) commercial disposal. Approaches to the further study of these three salt management techniques are recommended

  15. Making Texas Restaurants Healthier for Children

    Centers for Disease Control (CDC) Podcasts

    Sylvia Crixell, PhD, RD, Professor of Nutrition at Texas State University, discusses her study which details the success of a community-based program in Texas aimed at combatting childhood obesity by improving children’s menus in restaurants.

  16. Crustal deformation and seismic measurements in the region of McDonald Observatory, West Texas. [Texas and Northern Chihuahua, Mexico

    Science.gov (United States)

    Dorman, H. J.

    1981-01-01

    The arrival times of regional and local earthquakes and located earthquakes in the Basin and Range province of Texas and in the adjacent areas of Chihuahua, Mexico from January 1976 to August 1980 at the UT'NASA seismic array are summarized. The August 1931 Texas earthquake is reevaluated and the seismicity and crustal structure of West Texas is examined. A table of seismic stations is included.

  17. Site-Based Budgeting in Fort Worth, Texas.

    Science.gov (United States)

    Peternick, Lauri; Sherman, Joel

    1998-01-01

    Examines the Fort Worth Independent School District's decentralized decision-making system through three lenses: a review of site-based decision-making procedures at several schools; an examination of who participates; and stakeholders' perceptions. Some schools operated democratically, significantly including teachers, parents, and community…

  18. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    International Nuclear Information System (INIS)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions

  19. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  20. Emergence of Integrated Urology-Radiation Oncology Practices in the State of Texas

    International Nuclear Information System (INIS)

    Jhaveri, Pavan M.; Sun Zhuyi; Ballas, Leslie; Followill, David S.; Hoffman, Karen E.; Jiang Jing; Smith, Benjamin D.

    2012-01-01

    Purpose: Integrated urology-radiation oncology (RO) practices have been advocated as a means to improve community-based prostate cancer care by joining urologic and radiation care in a single-practice environment. However, little is known regarding the scope and actual physical integration of such practices. We sought to characterize the emergence of such practices in Texas, their extent of physical integration, and their potential effect on patient travel times for radiation therapy. Methods and Materials: A telephone survey identified integrated urology-RO practices, defined as practices owned by urologists that offer RO services. Geographic information software was used to determine the proximity of integrated urology-RO clinic sites with respect to the state's population. We calculated patient travel time and distance from each integrated urology-RO clinic offering urologic services to the RO treatment facility owned by the integrated practice and to the nearest nonintegrated (independent) RO facility. We compared these times and distances using the Wilcoxon-Mann-Whitney test. Results: Of 229 urology practices identified, 12 (5%) offered integrated RO services, and 182 (28%) of 640 Texas urologists worked in such practices. Approximately 53% of the state population resides within 10 miles of an integrated urology-RO clinic site. Patients with a diagnosis of prostate cancer at an integrated urology-RO clinic site travel a mean of 19.7 miles (26.1 min) from the clinic to reach the RO facility owned by the integrated urology-RO practice vs 5.9 miles (9.2 min) to reach the nearest nonintegrated RO facility (P<.001). Conclusions: Integrated urology-RO practices are common in Texas and are generally clustered in urban areas. In most integrated practices, the urology clinics and the integrated RO facilities are not at the same location, and driving times and distances from the clinic to the integrated RO facility exceed those from the clinic to the nearest

  1. Clone of EPA Approved Regulations in the Texas SIP

    Science.gov (United States)

    changed name to EPA Approved Regulations in the Texas SIP, Add links to:Texas Read Me; Texas SIP History;Current/Previous SIP-Approved Regulations; Delete regulations--now in /node/191099, removed tables

  2. 76 FR 67397 - Radio Broadcasting Services; Llano, Texas

    Science.gov (United States)

    2011-11-01

    ...] Radio Broadcasting Services; Llano, Texas AGENCY: Federal Communications Commission. ACTION: Proposed... substituting Channel 242C3 for vacant Channel 293C3, at Llano, Texas. The proposal is part of a contingently... required for the allotment of Channel 242C3 at Llano, Texas, because the proposed allotment is located...

  3. 76 FR 18210 - Texas Eastern Transmission, LP; Notice of Application

    Science.gov (United States)

    2011-04-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-138-000] Texas Eastern Transmission, LP; Notice of Application On March 15, 2011, Texas Eastern Transmission Corporation (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056-5310, filed with the Federal Energy Regulatory...

  4. Oceanographic measurements from the Texas Automated Buoy System (TABS)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Texas Automated Buoy System contains daily oceanographic measurements from seven buoys off the Texas coast from Brownsville to Sabine. The Texas General Land...

  5. Environmental Safety and Health Analytical Laboratory, Pantex Plant, Amarillo, Texas. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-06-01

    The US Department of Energy (DOE) has prepared an Environmental Assessment (EA) of the construction and operation of an Environmental Safety and Health (ES ampersand H) Analytical Laboratory and subsequent demolition of the existing Analytical Chemistry Laboratory building at Pantex Plant near Amarillo, Texas. In accordance with the Council on Environmental Quality requirements contained in 40 CFR 1500--1508.9, the Environmental Assessment examined the environmental impacts of the Proposed Action and discussed potential alternatives. Based on the analysis of impacts in the EA, conducting the proposed action, construction of an analytical laboratory and demolition of the existing facility, would not significantly effect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA) and the Council on Environmental Quality regulations in 40 CFR 1508.18 and 1508.27

  6. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site: Final

    International Nuclear Information System (INIS)

    1994-01-01

    Thorium 230 (Th-230) at the Gunnison, Colorado processing site will require remediation, however, a seasonally fluctuating groundwater table at the site significantly complicates conventional remedial action with respect to cleanup. Therefore, to effectively remediate the site with respect to Radium 226 (Ra-226) and Th-230, the following supplemental standard is proposed: In situ Ra-26 will be remediated to the EPA soil cleanup standards independent of groundwater considerations. In situ Th-230 concentrations will be remediated in the region above the encountered water table so the 1000-year projected Ra-226 concentration complies with the EPA soil cleanup concentration limits. If elevated Th-230 persists to the water table, an additional foot of excavation will be performed and the grid will be backfilled. Excavated grids will be backfilled to the final remedial action grade with clean cobbly soil. Final grid verification that is required below the water table will be performed by extracting and analyzing a single bulk soil sample with the bucket of a backhoe. Modeled surface radon flux values will be estimated and documented. A recommendation will be made that land records should be annotated to identify the presence of residual Th-230

  7. 77 FR 66574 - Texas Regulatory Program

    Science.gov (United States)

    2012-11-06

    ... regulations and improve operational efficiency. This document gives the times and locations that the Texas... during regular business hours at the following location: Surface Mining and Reclamation Division... for you to read at the locations listed above under ADDRESSES or at www.regulations.gov . Texas...

  8. 77 FR 25949 - Texas Regulatory Program

    Science.gov (United States)

    2012-05-02

    ... regulations and improve operational efficiency. This document gives the times and locations that the Texas... during regular business hours at the following location: Surface Mining and Reclamation Division... locations listed above under ADDRESSES or at www.regulations.gov . Texas proposes to revise its regulation...

  9. 76 FR 49760 - Texas Eastern Transmission, LP; Notice of Application

    Science.gov (United States)

    2011-08-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-524-000] Texas Eastern Transmission, LP; Notice of Application Take notice that on July 29, 2011, Texas Eastern Transmission, LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056-5310, filed with the Federal Energy...

  10. 78 FR 64933 - Texas Eastern Transmission, LP; Notice of Application

    Science.gov (United States)

    2013-10-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14-4-000] Texas Eastern Transmission, LP; Notice of Application Take notice that on October 10, 2013, Texas Eastern Transmission, (Texas Eastern), having its principal place of business at 5400 Westheimer Court, Houston, Texas, 77056...

  11. Spatiotemporal associations of reservoir nutrient characteristics and the invasive, harmful alga Prymnesium parvum in West Texas

    Science.gov (United States)

    VanLandeghem, Matthew M.; Farooqi, Mukhtar; Southard, Greg M.; Patino, Reynaldo

    2015-01-01

    Golden alga (Prymnesium parvum) is a harmful alga that has caused ecological and economic harm in freshwater and marine systems worldwide. In inland systems of North America, toxic blooms have nearly eliminated fish populations in some systems. Modifying nutrient profiles through alterations to land or water use may be a viable alternative for golden alga control in reservoirs. The main objective of this study was to improve our understanding of the nutrient dynamics that influence golden alga bloom formation and toxicity in west Texas reservoirs. We examined eight sites in the Upper Colorado River basin, Texas: three impacted reservoirs that have experienced repeated golden alga blooms; two reference reservoirs where golden alga is present but nontoxic; and three confluence sites downstream of the impacted and reference sites. Total, inorganic, and organic nitrogen and phosphorus and their ratios were quantified monthly along with golden alga abundance and ichthyotoxicity between December 2010 and July 2011. Blooms persisted for several months at the impacted sites, which were characterized by high organic nitrogen and low inorganic nitrogen. At impacted sites, abundance was positively associated with inorganic phosphorus and bloom termination coincided with increases in inorganic nitrogen and decreases in inorganic phosphorus in late spring. Management of both inorganic and organic forms of nutrients may create conditions in reservoirs unfavorable to golden alga.

  12. Endangered Species Management Plan for Fort Hood, Texas: FY06-10

    Science.gov (United States)

    2007-05-01

    Texas red oak, post oak, Texas ash (Fraxinus texensis), shin oak, blackjack oak (Quercus marilandica), slippery elm (Ulmus rubra), cedar elm ...by Ashe juniper and Texas oak. Other important tree species included live oak, cedar elm (Ulmus crassifolia), Lacey oak (Quercus laceyi), Arizona...0.83 m (Cimprich 2005). Nest substrates include shin oak, Texas red oak, Texas redbud, Ashe juniper, Texas ash, Plateau live oak, cedar elm , rusty

  13. 78 FR 43874 - Texas Eastern Transmission, LP; Notice of Application

    Science.gov (United States)

    2013-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13-514-000] Texas Eastern Transmission, LP; Notice of Application On July 2, 2013, Texas Eastern Transmission, LP (Texas Eastern) filed... natural gas facilities no longer in service. As described more fully in the Application, Texas Eastern...

  14. 76 FR 38381 - Texas Eastern Transmission, LP; Notice of Amendment

    Science.gov (United States)

    2011-06-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-67-001] Texas Eastern Transmission, LP; Notice of Amendment Take notice that on June 13, 2011, Texas Eastern Transmission, LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056, filed in the above referenced docket an amendment...

  15. 77 FR 20015 - Texas Eastern Transmission, LP; Notice of Application

    Science.gov (United States)

    2012-04-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-88-000] Texas Eastern Transmission, LP; Notice of Application Take notice that on March 19, 2012, Texas Eastern Transmission, LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056-5310, filed an application in Docket No...

  16. 77 FR 12045 - Texas Eastern Transmission, LP; Notice of Application

    Science.gov (United States)

    2012-02-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-68-000] Texas Eastern Transmission, LP; Notice of Application Take notice that on February 16, 2012, Texas Eastern Transmission, LP (Texas Eastern), PO Box 1642, Houston, Texas 77056 filed an application in the above referenced docket...

  17. High energy physics program at Texas A ampersand M University

    International Nuclear Information System (INIS)

    1992-12-01

    The Texas A ampersand M experimental high energy physics program has been supported since its inception by DOE Contract DE-AS05-81ER40039. During that period we established a viable experimental program at a university which before this time had no program in high energy physics. In 1990, the experimental program was augmented with a program in particle theory. In the accompanying final report, we outline the research work accomplished during the final year of this contract and the program being proposed for consideration by the Department of Energy for future grant support. Some of the particular areas covered are: Collider detector at Fermilab program; the TAMU MACRO program; SSC R ampersand D program; SSC experimental program; and theoretical physics program

  18. Assessing aquifer storage and recovery feasibility in the Gulf Coastal Plains of Texas

    Directory of Open Access Journals (Sweden)

    W. Benjamin Smith

    2017-12-01

    Full Text Available Study region: The Gulf Coast and Carrizo-Wilcox aquifer systems in the Gulf Coastal Plains of Texas. Study focus: Aquifer storage and recovery is a water storage alternative that is underutilized in Texas, a state with both long periods of drought and high intensity storms. Future water storage plans in Texas almost exclusively rely on surface reservoirs, subject to high evaporative losses. This study seeks to identify sites where aquifer storage and recovery (ASR may be successful, especially in recovery of injected waters, by analyzing publicly-available hydrogeologic data. Transmissivity, hydraulic gradient, well density, depth to aquifer, and depth to groundwater are used in a GIS-based index to determine feasibility of implementing an ASR system in the Gulf Coast and Carrizo-Wilcox aquifer systems. New hydrological insights for the region: Large regions of the central and northern Gulf Coast and the central and southern Carrizo-Wilcox aquifer systems are expected to be hydrologically feasible regions for ASR. Corpus Christi, Victoria, San Antonio, Bryan, and College Station are identified as possible cities where ASR would be a useful water storage strategy. Keywords: Aquifer storage and recovery (ASR, GIS, Gulf coast, Carrizo-Wilcox, Managed aquifer recharge (MAR

  19. 78 FR 66352 - Texas Eastern Transmission, LP; Notice of Application

    Science.gov (United States)

    2013-11-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14-9-000] Texas Eastern Transmission, LP; Notice of Application Take notice that on October 17, 2013, Texas Eastern Transmission, LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056, filed an application in Docket No. CP14-9...

  20. 78 FR 79687 - Texas Eastern Transmission, LP; Notice of Application

    Science.gov (United States)

    2013-12-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14-29-000] Texas Eastern Transmission, LP; Notice of Application Take notice that on December 10, 2013 Texas Eastern Transmission, LP (Texas Eastern), at 5400 Westheimer Court, Houston, Texas 77056, filed an application in Docket No. CP14...

  1. 77 FR 26534 - Texas Eastern Transmission, LP; Notice of Application

    Science.gov (United States)

    2012-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-164-000] Texas Eastern Transmission, LP; Notice of Application Take notice that on April 19, 2012, Texas Eastern Transmission, LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056, filed in Docket No. CP12-164-000, a request...

  2. Final report for Texas A&M University Group Contribution to DE-FG02-09ER25949/DE-SC0002505: Topology for Statistical Modeling of Petascale Data (and ASCR-funded collaboration between Sandia National Labs, Texas A&M University and University of Utah)

    Energy Technology Data Exchange (ETDEWEB)

    Rojas, Joseph Maurice [Texas A& M University

    2013-02-27

    We summarize the contributions of the Texas A\\&M University Group to the project (DE-FG02-09ER25949/DE-SC0002505: Topology for Statistical Modeling of Petascale Data - an ASCR-funded collaboration between Sandia National Labs, Texas A\\&M U, and U Utah) during 6/9/2011 -- 2/27/2013.

  3. Geotechnical Impacts of Hurricane Harvey Along the Texas, USA Coast

    Science.gov (United States)

    Smallegan, S. M.; Stark, N.; Jafari, N.; Ravichandran, N.; Shafii, I.; Bassal, P.; Figlus, J.

    2017-12-01

    As part of the NSF-funded Geotechnical Extreme Events Reconnaissance (GEER) Association response to Hurricane Harvey, a team of engineers and scientists mobilized to the coastal cities of Texas, USA from 1 to 5 September 2017. Damage to coastal and riverine structures due to erosion by storm surge, waves, and coastal and riverine flooding was assessed in a wide coastal zone between Corpus Christi and Galveston. Making initial landfall near Rockport, Texas on 26 August 2017, Hurricane Harvey was classified as a category 4 hurricane on the Saffir-Simpson scale with wind speeds exceeding 130 mph and an atmospheric pressure of 938 mbar. The storm stalled over the Houston area, pouring 40 inches of rain on an area encompassing more than 3,000 square miles. Hurricane Harvey, which remained a named storm for 117 hours after initial landfall, slowly moved east into the Gulf of Mexico and made final landfall near Cameron, Louisiana on 30 August. The GEER team surveyed sixteen main sites, extending from Mustang Island in the southwest to Galveston in the northeast and as far inland as Rosenburg. In Port Aransas, beach erosion and undercutting along a beach access road near Aransas Pass were observed. Due to several tide gauge failures in this area, the nearest NOAA tide gauge (#8775870 near Corpus Christi) was used to estimate water levels of 1.35 m, approximately 1.0 m above the predicted tide. In Holiday Beach, anchored retaining walls were inundated, causing backside scour along the entire length and exposing the sheetpile wall anchors. Along the Colorado River at the Highway 35 bridge near Bay City, active riverbank failure was observed and a sheet pile wall was found collapsed. Significant sediment deposits lined the vegetated riverbanks. A USGS stream gage recorded gage heights greater than 45 ft, exceeding the flood stage of 44 ft. Fronting a rubblemound seawall in Surfside Beach, a runnel and ridge formation was observed. Nearby at San Luis Pass, infilled scour

  4. Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program -12184

    Energy Technology Data Exchange (ETDEWEB)

    Clayton, Christopher [U.S Department of Energy Office of Legacy Management, Washington, DC; Kothari, Vijendra [U.S Department of Energy Office of Legacy Management, Morgantown, West Virginia; Starr, Ken [U.S Department of Energy Office of Legacy Management, Westminster, Colorado; Widdop, Michael; Gillespie, Joey [SM Stoller Corporation, Grand Junction, Colorado

    2012-02-26

    The U. S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS&M) program: Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. DOE must continue to maintain constructive relationships with the U

  5. 20-kW solar photovoltaic flat-panel power system for an uninterruptible power-system load in El Paso, Texas. Phase II. System fabrication. Final report October 1, 1979-May 31, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Risser, V.V.

    1981-12-01

    The system plans, construction, integration and test, and performance evaluation are discussed for the photovoltaic power supply at the Newman Power Station in El Paso, Texas. The system consists of 64 parallel-connected panels, each panel containing nine series-connected photovoltaic modules. The system is connected, through power monitoring equipment, to an existing DC bus that supplies uninterruptible power to a computer that controls the power generating equipment. The site is described and possible environmental hazards are assessed. Site preparation and the installation of the photovoltaic panels, electrical cabling, and instrumentation subsystems are described. System testing includes initial system checkout, module performance test, control system test. A training program for operators and maintenance personnel is briefly described, including visual aids. Performance data collection and analysis are described, and actual data are compared with a computer simulation. System drawings are included. (LEW)

  6. 75 FR 45611 - Texas Eastern Transmission LP; Notice of Application

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10-471-000] Texas Eastern Transmission LP; Notice of Application July 27, 2010. Take notice that on July 15, 2010, Texas Eastern Transmission (Texas Eastern), P.O. Box 1642, Houston, Texas 77251-1642, filed in Docket No. CP10-471-000, an...

  7. East Texas, 2011 forest inventory and analysis factsheet

    Science.gov (United States)

    Jason A. Cooper; James W. Bentley

    2012-01-01

    This science update summarizes the findings of the annual inventory conducted by the Southern Forest Inventory and Analysis (FIA) Program in cooperation with the Texas Forest Service of the forest resource attributes in east Texas. The 254 counties of Texas are consolidated into 7 FIA survey units—southeast (unit 1), northeast (unit 2), north central (unit 3), south (...

  8. Soil an-d nutrient loss following site preparation burning

    Science.gov (United States)

    E.A. Carter; J.P. Field; K.W. Farrish

    2000-01-01

    Sediment loss and nutrient cpncentrations in runoff were evaluated to determine the effects of site preparation burning on a recently harvested loblolly pine (Pinur taeda L.) site in east Texas. Sediment and nutrient losses prior to treatment were approximately the same from control plots and pretreatment burn plots. Nutrient analysis of runoff samples indicated that...

  9. Texas Heart Institute

    Science.gov (United States)

    ... of seminars and conferences. Resources Texas Heart Institute Journal Scientific Publications Library & Learning Resources Resources for Physicians Fellowships & Residencies School of Perfusion Technology THI Spotlight Check out the ...

  10. Distribution of indoor radon concentrations and uranium-bearing rocks in Texas

    International Nuclear Information System (INIS)

    Hudak, P.F.

    1996-01-01

    The purpose of this study was to compare regional patterns of indoor radon concentration with uranium-bearing rock zones and county populations in Texas. Zones yielding radon concentrations that are relatively high for Texas include shale and sandstone in northwest Texas; red beds in north-central Texas; felsic volcanic rocks in west Texas; and sandstone, limestone, and igneous rocks in central Texas. Located in northwest Tecas, only five of the 202 counties evaluated have mean indoor radon concentrations above 4.0 pCi l -1 . Two of those counties have populations above the state median of 20115. The highest county mean concentration is 8.8 pCi l -1 . Results of the study suggest that (1) regional geology influences indoor radon concentrations in Texas, (2) statewide, the radon concentrations are relatively low, (3) highly populated counties do not coincide with regions of high indoor radon concentration, and (4) regions that may warrant further monitoring include northwest Texas and, to a lesser degree, west and central Texas. (orig.)

  11. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al.

    Energy Technology Data Exchange (ETDEWEB)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.

  12. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al

    International Nuclear Information System (INIS)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation

  13. The Myth of the Texas Miracle in Education

    Directory of Open Access Journals (Sweden)

    Walt Haney

    2000-08-01

    Full Text Available I summarize the recent history of education reform and statewide testing in Texas, which led to introduction of the Texas Assessment of Academic Skills (TAAS in 1990-91. A variety of evidence in the late 1990s led a number of observers to conclude that the state of Texas had made near miraculous progress in reducing dropouts and increasing achievement. The passing scores on TAAS tests were arbitrary and discriminatory. Analyses comparing TAAS reading, writing and math scores with one another and with relevant high school grades raise doubts about the reliability and validity of TAAS scores. I discuss problems of missing students and other mirages in Texas enrollment statistics that profoundly affect both reported dropout statistics and test scores. Only 50% of minority students in Texas have been progressing from grade 9 to high school graduation since the initiation of the TAAS testing program. Since about 1982, the rates at which Black and Hispanic students are required to repeat grade 9 have climbed steadily, such that by the late 1990s, nearly 30% of Black and Hispanic students were "failing" grade 9. Cumulative rates of grade retention in Texas are almost twice as high for Black and Hispanic students as for White students. Some portion of the gains in grade 10 TAAS pass rates are illusory. The numbers of students taking the grade 10 tests who were classified as "in special education" and hence not counted in schools' accountability ratings nearly doubled between 1994 and 1998. A substantial portion of the apparent increases in TAAS pass rates in the 1990s are due to such exclusions. In the opinion of educators in Texas, schools are devoting a huge amount of time and energy preparing students specifically for TAAS, and emphasis on TAAS is hurting more than helping teaching and learning in Texas schools, particularly with at-risk students, and TAAS contributes to retention in grade and dropping out. Five different sources of evidence about

  14. Environmental analysis and data report prepared for the environmental assessment of remedial action at the inactive uranium mill tailings site near Falls City, Texas

    International Nuclear Information System (INIS)

    1991-12-01

    This document contains information and data gathered in support of the preparation of the environmental assessment (EA) of the proposed remedial action at the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas. The Falls City EA was prepared pursuant to the National Environmental Policy Act (NEPA), which requires Federal agencies to assess the impacts of their actions on the environment. It examines the short- and long-term effects of the US Department of Energy's (DOE) remedial action for the Falls City site as well as the no action alternative. The DOE will use the information and analyses presented in the EA to determine whether the proposed action would have a significant impact on the environment. If the impacts are determined to be significant, an environmental impact statement (EIS) will be prepared. If the impacts are not determined to be significant, the DOE may issue a Finding of No Significant Impact (FONSI) and implement the proposed action. The information and data presented in this report are for background purposes only and are not required as part of the NEPA decision-making process

  15. Rail transportation corridor analysis report: Deaf Smith County location in the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    1986-10-01

    An environmental data base was developed for the purpose of preliminary siting of potential rail access corridors between existing rail lines and the potential repository site in Deaf Smith County, Texas. The categories of the data base were environmental conditions considered significant in rail line construction and operation. These included land cover, population areas, slope, surface hydrology, cultivated prime agricultural lands, cultural features, and utility rights-of-way. The categories were divided into avoidance, constraint, and opportunity features, and the constraint features were then weighted for environmental impact potential. An environmental screening analysis using the computerized Geographical Information System (GIS) was then performed. The analysis involved applying the GIS overlay process to the various constraint data categories to produce a composite constraint map of the study area. The composite constraint map, color coded for various levels of constraint to corridor siting, was subsequently used as a guide for the selection of a series of alternative corridors. By means of a further application of GIS procedures, the corridor alternatives were statistically analyzed for adherence to corridor selection guidelines. In addition, a supplementary analysis was performed to compare the alternatives in terms of four impact categories: road crossings, construction costs, degree of land disruption, and population impact. The statistical and supplementary impact analyses led to a preliminary selection of a preferred corridor. The corridor assessment process indicated the importance of analyzing alternative trade-offs, as well as the need for more detailed investigation of certain conditions and a detailed comparison of alternatives prior to final corridor siting

  16. Hydrologic data for North Creek, Trinity River basin, Texas, 1979

    Science.gov (United States)

    Kidwell, C.C.

    1981-01-01

    This report contains rainfall and runoff data collected during the 1979 water year for the 21.6-square mile area above the stream-gaging station North Creek near Jacksboro, Texas. A continuous water-stage recording gage was installed at one representative floodwater-retarding structure (site 28-A) on Oct. 5, 1972. The data are collected to compute the contents, surface area, inflow, and outflow at this site. The stream-gaging station on North Creek near Jacksboro continuously records the water level which, with measurements of streamflow, is used to compute the runoff from the study area. Streamflow records at this gage began on Aug. 8, 1956. Detailed rainfall-runoff computations are included for one storm during the 1979 water year at the stream-gaging station. (USGS)

  17. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume IV

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 4, describes the current safety concerns associated with the tank waste and analyzes the potential accidents and associated potential health effects that could occur under the alternatives included in this Tank Waste Remediation System (TWRS) Final Environmental Impact Statement (EIS) for the Hanford Site, Richland, Washington

  18. GOWind Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hatton, Ian [CEO

    2014-12-19

    To obtain a permit, to construct, to connect 3x6MW permanent magnet direct drive wind power generators, and to deliver to the ERCOT grid 18MW of renewable energy from up to 5 miles offshore San Pedro Island, Texas. To further develop the site to accommodate up to 1000MW of productivity and thereby drive down the average cost of construction, making offshore wind power economically competitive with alternative sources of energy.

  19. Proposed nomination of sites for site characterization and recommendation of issues for environmental assessments and site characterization plans. Technical report. Summary of issues and concerns expressed during the April-May 1983 US Department of Energy public hearings

    International Nuclear Information System (INIS)

    1983-09-01

    As required by Section 112(b)(2) of the Nuclear Waste Policy Act (Public Law 97-425), the US Department of Energy (DOE) conducted a series of nine formal public hearings during April and May 1983 in local communities in the vicinity of seven identified potentially acceptable salt sites and in the state capitals of the States of Louisiana, Mississippi, Texas, and Utah. The public hearings focused on the proposed nomination of the Vacherie Dome site in Louisiana; the Richton and Cypress Creek Salt Dome sites in Mississippi; the Deaf Smith County and Swisher County bedded salt sites in Texas; and the Davis and Lavender Canyon bedded salt sites in Utah. The issues expressed during area public hearings are summarized in this document, which serves as a digest of and as an index to the public hearing records of each of the four salt states. Specifically, almost 1100 paraphrased public hearing comments are identified and grouped into 62 subjects within the following nine general topical areas: NWTS Program Planning Process, Consultation and Cooperation, Engineering/Repository Design, Geology, Hydrology, Transportation, Public Health and Safety, Environmental Quality, and Socioeconomics

  20. Geology and recognition criteria for sandstone uranium deposits in mixed fluvial-shallow marine sedimentary sequences, South Texas. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.S.; Smith, R.B.

    1981-01-01

    Uranium deposits in the South Texas Uranium Region are classical roll-type deposits that formed at the margin of tongues of altered sandstone by the encroachment of oxidizing, uraniferous solutions into reduced aquifers containing pyrite and, in a few cases, carbonaceous plant material. Many of the uranium deposits in South Texas are dissimilar from the roll fronts of the Wyoming basins. The host sands for many of the deposits contain essentially no carbonaceous plant material, only abundant disseminated pyrite. Many of the deposits do not occur at the margin of altered (ferric oxide-bearing) sandstone tongues but rather occur entirely within reduced, pyurite-bearing sandstone. The abundance of pyrite within the sands probably reflects the introduction of H/sub 2/S up along faults from hydrocarbon accumulations at depth. Such introductions before ore formation prepared the sands for roll-front development, whereas post-ore introductions produced re-reduction of portions of the altered tongue, leaving the deposit suspended in reduced sandstone. Evidence from three deposits suggests that ore formation was not accompanied by the introduction of significant amounts of H/sub 2/S.

  1. Geology and recognition criteria for sandstone uranium deposits in mixed fluvial-shallow marine sedimentary sequences, South Texas. Final report

    International Nuclear Information System (INIS)

    Adams, S.S.; Smith, R.B.

    1981-01-01

    Uranium deposits in the South Texas Uranium Region are classical roll-type deposits that formed at the margin of tongues of altered sandstone by the encroachment of oxidizing, uraniferous solutions into reduced aquifers containing pyrite and, in a few cases, carbonaceous plant material. Many of the uranium deposits in South Texas are dissimilar from the roll fronts of the Wyoming basins. The host sands for many of the deposits contain essentially no carbonaceous plant material, only abundant disseminated pyrite. Many of the deposits do not occur at the margin of altered (ferric oxide-bearing) sandstone tongues but rather occur entirely within reduced, pyurite-bearing sandstone. The abundance of pyrite within the sands probably reflects the introduction of H 2 S up along faults from hydrocarbon accumulations at depth. Such introductions before ore formation prepared the sands for roll-front development, whereas post-ore introductions produced re-reduction of portions of the altered tongue, leaving the deposit suspended in reduced sandstone. Evidence from three deposits suggests that ore formation was not accompanied by the introduction of significant amounts of H 2 S

  2. Comment and response document for the final remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Revision 2

    International Nuclear Information System (INIS)

    1996-05-01

    This document for the final remedial action plan and site design has been prepared for US Department of Energy Environmental Restoration Division as part of the Uranium Mill Tailings Remedial Action plan. Comments and responses are included for the site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

  3. Impact of the Mexican Alien Commuter on the Apparel Industry of El Paso, Texas--A Case Study. Final Report.

    Science.gov (United States)

    Rungeling, Brian Scott

    This study analyzed what effect commuters had on wage levels, employment, and industrial locations, and the relative importance of the commuter as part of the work force. A questionnaire was administered to 190 workers and to their 20 employers in the apparel industry of El Paso, Texas. The questionnaires revealed that the commuters were paid the…

  4. Final storage high-level radioactive waste in Sweden - the way to the 2009 siting decision

    International Nuclear Information System (INIS)

    Schneider, Horst

    2010-01-01

    In Sweden, high-level radioactive waste producing heat, i.e. spent fuel, is to be emplaced for final storage on the site of Forsmark, which also holds three reactor units. The siting decision was taken in June 2009. A 100 percent private company, a merger of the commercial nuclear power plant operators as producers of the waste, is responsible for the siting decision as well as for waste storage. Major impulses were given to the back-end fuel cycle policy in the early 1970s. Sweden practically gave up the reprocessing option very soon, but kept on pursuing final storage in deep geologic formations. Between 1977, when legislation was adopted with conditions relating to repository storage, and 2009, when the decision in favour of the Forsmark site was taken, the path followed was not always a straight line. The boundary conditions, such as the organization of the repository and procedural and safety criteria established by the government, are interesting with regard to their influence on the siting decision, if any. For this reason, the approaches chosen and their connections with government criteria and with geological conditions in Sweden, including their impacts on the repository concept chosen, will be examined. After a summary review of developments in Sweden, filing of the licensing application and the accompanying documents up to commissioning of the repository, a short comparison will be made with the situation in Germany, especially the status reached of the Gorleben salt dome, highlighting and evaluating important criteria and parameters. Sweden as a model is important especially in these respects: A repository site was found by a private company in consensus with the local government within the framework of government criteria, and with ultimate responsibility resting with the government; the local government of a place not winning the siting decision is disappointed although it will have the conditioning plant and receive higher grants; it was not only

  5. Hydrologic data for North Creek, Trinity River basin, Texas, 1976

    Science.gov (United States)

    Kidwell, C.C.

    1978-01-01

    This report contains rainfall and runoff data collected during the 1976 water year for a 21.6-square mile area above the stream-gaging station on North Creek near Jacksboro, Texas. A continuous water-stage recording gage was installed at one representative floodwater-retarding structure (site 28-A) on Oct. 5, 1972. The data are used to compute the contents, surface area, inflow, and outflow at this site. The stream-gaging station on North Creek near Jacksboro continuously records the water level which, with measurements of streamflow, is used to compute the runoff from the study area. Streamflow records at this gage began on Aug. 8, 1956. Detailed rainfall-runoff computations, including hydrographs and mass curves, are included for two storm periods during the 1976 water year at the stream-gaging station. (Woodard-USGS)

  6. 76 FR 35025 - Nokia, Inc.; a Subsidiary of Nokia Group; Including On-Site Leased Workers From ATC Logistics and...

    Science.gov (United States)

    2011-06-15

    ... of Nokia Group; Including On-Site Leased Workers From ATC Logistics and Electronics and Adecco Fort... workers from ATC Logistics and Electronics, Fort Worth, Texas. The workers supplied planning and materials... ATC Logistics and Electronics, and Adecco, Fort Worth, Texas, who became totally or partially...

  7. Catahoula formation as a source of sedimentary uranium deposits in east Texas

    International Nuclear Information System (INIS)

    Ledger, E.B.; Tieh, T.T.

    1983-01-01

    Volcanic glass-rich mudstone and siltstone samples from the Oligocene/Miocene Catahoula formation of Jasper County, Texas, and coeval volcaniclastic rock samples from Trans-Pecos, Texas, have been compared as to U, Th, Zr, Ti, K, Rb, and Sr contents. Uranium is slightly greater in the distal ash (5.85 ppM U) compared to the Trans-Pecos samples (average 5.41 ppM U). Diagenetic and pedogenetic alteration of Catahoula volcanic glass releases uranium to solution and, under favorable conditions, this uranium may accumulate to form ore bodies. Uranium has been produced from such ore bodies in south Texas, but economic deposits are not known in east Texas. Significant differences between south and east Texas include: (1) a greater amount of volcanic debris delivered to south Texas, both as air-fall ash and stream-transported material, (2) delivery of only air-fill ash to east Texas, (3) the possibility of more petroleum-related reductants such as H 2 S in south Texas, and (4) pervasive glass alteration with subsequent uranium release in south Texas due to late calichification. These differences argue against economic deposits of the south Texas type being found in east Texas. If economic deposits occur they are likely to be far downdip making exploration difficult and expensive

  8. Renewable Energy Opportunities at Fort Hood, Texas

    Energy Technology Data Exchange (ETDEWEB)

    Solana, Amy E.; Warwick, William M.; Orrell, Alice C.; Russo, Bryan J.; Parker, Kyle R.; Weimar, Mark R.; Horner, Jacob A.; Manning, Anathea

    2011-11-14

    This report presents the results of Pacific Northwest National Laboratory's (PNNL) follow-on renewable energy (RE) assessment of Fort Hood. Fort Hood receives many solicitations from renewable energy vendors who are interested in doing projects on site. Based on specific requests from Fort Hood staff so they can better understand these proposals, and the results of PNNL's 2008 RE assessment of Fort Hood, the following resources were examined in this assessment: (1) Municipal solid waste (MSW) for waste-to-energy (WTE); (2) Wind; (3) Landfill gas; (4) Solar photovoltaics (PV); and (5) Shale gas. This report also examines the regulatory issues, development options, and environmental impacts for the promising RE resources, and includes a review of the RE market in Texas.

  9. Catahoula Formation as uranium source rock in East Texas

    International Nuclear Information System (INIS)

    Ledger, E.B.; Tieh, T.T.; Rowe, N.W.

    1984-01-01

    The Oligocene-Miocene Catahoula Formation of the Texas Gulf coastal plain is a fluvial and lacustrine volcaniclastic unit composed of normal fluvial material mixed with distal rhyolitic air-fall ash. In the lower Texas Gulf coastal plain, it consists of stream-transported detritus from the volcanic source area in Trans-Pecos Texas and adjacent Mexico. This volcaniclastic component has altered to release uranium to mineralization processes in the lower Gulf Coast, but there has not been uranium production in the middle and upper Gulf Coast. To evaluate the potential of the upper Texas Gulf coastal plain for uranium ore deposits, a geochemical study was undertaken. The Catahoula Formation was analyzed for U, Th, K, Rb, Sr, Zr, and Ti to estimate the nature of volcanic glass and its abundance and alteration. Concentrations from three key outcrops were compared. They were also compared to samples from a volcanic area in Trans-Pecos Texas, which is chemically appropriate as a source for the volcanic material in the Catahoula Formation. In the lower Texas Gulf coastal plain, where uranium is produced, the glassy volcanic material has been pervasively altered, but in the upper coastal plain much glass remains. Because glass alteration is necessary for uranium release and concentration, the potential is low for large, shallow uranium ore bodies in the upper Texas Gulf coastal plain

  10. Mock Site Licensing Demonstration Project. Final report

    International Nuclear Information System (INIS)

    Roop, R.D.

    1986-06-01

    The Mock Site Licensing Demonstration Project developed the Low-Level Radioactive Waste Siting Simulation, a role-playing exercise designed to facilitate the process of siting and licensing disposal facilities for low-level waste (LLW). This report describes the development, contant, and usefulness of the siting simulation. The simulation was designed by Harvard University's Program on Negotiation; it can be conducted at a workshop or conference, involves 14 or more participants, and requires about eight hours to complete. The simulation consists of two sessions. In the first, participants negotiate the selection of siting criteria, and in the second, a preferred site for a facility is chosen from three candidate sites. The project sponsored two workshops (in Boston, Massachusetts and Richmond, Virginia) in which the simulation was conducted for persons involved in planning for LLW. It is concluded that the siting simulation can be useful in three ways: (1) as a tool for information dissemination, (2) as a vehicle that can foste communication among parties in conflict, and (3) as a step toward consensus building and conflict resolution. The DOE National Low-Level Waste Management Program is now making the siting simulation available for use by states, regional compacts, and other organizations involved in development of LLW disposal facilities

  11. East Texas, 2012—Forest Inventory and Analysis Factsheet

    Science.gov (United States)

    Thomas J. Brandeis; Jason A. Cooper; James W. Bentley

    2014-01-01

    This science update summarizes the findings of the statewide annual inventory of the forest resource attributes in Texas conducted by the Southern Forest Inventory and Analysis (FIA) Program in cooperation with the Texas A&M Forest Service. The 254 counties of Texas are consolidated into seven FIA survey units—southeast (unit 1), northeast (unit 2), north central (...

  12. Continuous and discrete water-quality data collected at five sites on Lake Houston near Houston, Texas, 2006-08

    Science.gov (United States)

    Beussink, Amy M.; Burnich, Michael R.

    2009-01-01

    Lake Houston, a reservoir impounded in 1954 by the City of Houston, Texas, is a primary source of drinking water for Houston and surrounding areas. The U.S. Geological Survey, in cooperation with the City of Houston, developed a continuous water-quality monitoring network to track daily changes in water quality in the southwestern quadrant of Lake Houston beginning in 2006. Continuous water-quality data (the physiochemical properties water temperature, specific conductance, pH, dissolved oxygen concentration, and turbidity) were collected from Lake Houston to characterize the in-lake processes that affect water quality. Continuous data were collected hourly from mobile, multi-depth monitoring stations developed and constructed by the U.S. Geological Survey. Multi-depth monitoring stations were installed at five sites in three general locations in the southwestern quadrant of the lake. Discrete water-quality data (samples) were collected routinely (once or twice each month) at all sites to characterize the chemical and biological (phytoplankton and bacteria) response to changes in the continuous water-quality properties. Physiochemical properties (the five continuously monitored plus transparency) were measured in the field when samples were collected. In addition to the routine samples, discrete water-quality samples were collected synoptically (one or two times during the study period) at all sites to determine the presence and levels of selected constituents not analyzed in routine samples. Routine samples were measured or analyzed for acid neutralizing capacity; selected major ions and trace elements (calcium, silica, and manganese); nutrients (filtered and total ammonia nitrogen, filtered nitrate plus nitrite nitrogen, total nitrate nitrogen, filtered and total nitrite nitrogen, filtered and total orthophosphate phosphorus, total phosphorus, total nitrogen, total organic carbon); fecal indicator bacteria (total coliform and Escherichia coli); sediment

  13. Final environmental impact statement for the Nevada Test Site and off-site locations in the state of Nevada: Mitigation action plan

    International Nuclear Information System (INIS)

    1997-02-01

    The DOE Notice of Availability for this environmental impact statement was published in the Federal Register on Friday, October 18, 1996 (61 FR 54437). The final environmental impact statement identifies potential adverse effects resulting from the four use alternatives evaluated and discusses measures that DOE considered for the mitigation of these potential adverse effects. The Secretary of Energy signed the Record of Decision on the management and operation of the Nevada Test Site and other DOE sites in the state of Nevada on December 9, 1996. These decisions will result in the continuation of the multipurpose, multi-program use of the Nevada Test Site, under which DOE will pursue a further diversification of interagency, private industry, and public-education uses while meeting its Defense Program, Waste Management, and Environmental Restoration mission requirements at the Nevada Test Site and other Nevada sites, including the Tonopah Test Range, the Project Shoal Site, the Central Nevada Test Area, and on the Nellis Air Force Range Complex. The Record of Decision also identifies specific mitigation actions beyond the routine day-to-day physical and administrative controls needed for implementation of the decisions. These specific mitigation actions are focused on the transportation of waste and on groundwater availability. This Mitigation Action Plan elaborates on these mitigation commitments

  14. Texas LPG fuel cell development and demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2004-07-26

    The State Energy Conservation Office has executed its first Fuel Cell Project which was awarded under a Department of Energy competitive grant process. The Texas LPG Fuel Processor Development and Fuel Cell Demonstration Program is a broad-based public/private partnership led by the Texas State Energy Conservation Office (SECO). Partners include the Alternative Fuels Research and Education Division (AFRED) of the Railroad Commission of Texas; Plug Power, Inc., Latham, NY, UOP/HyRadix, Des Plaines, IL; Southwest Research Institute (SwRI), San Antonio, TX; the Texas Natural Resource Conservation Commission (TNRCC), and the Texas Department of Transportation (TxDOT). The team proposes to mount a development and demonstration program to field-test and evaluate markets for HyRadix's LPG fuel processor system integrated into Plug Power's residential-scale GenSys(TM) 5C (5 kW) PEM fuel cell system in a variety of building types and conditions of service. The program's primary goal is to develop, test, and install a prototype propane-fueled residential fuel cell power system supplied by Plug Power and HyRadix in Texas. The propane industry is currently funding development of an optimized propane fuel processor by project partner UOP/HyRadix through its national checkoff program, the Propane Education and Research Council (PERC). Following integration and independent verification of performance by Southwest Research Institute, Plug Power and HyRadix will produce a production-ready prototype unit for use in a field demonstration. The demonstration unit produced during this task will be delivered and installed at the Texas Department of Transportation's TransGuide headquarters in San Antonio, Texas. Simultaneously, the team will undertake a market study aimed at identifying and quantifying early-entry customers, technical and regulatory requirements, and other challenges and opportunities that need to be addressed in planning commercialization of the units

  15. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  16. Benchmark West Texas Intermediate crude assayed

    International Nuclear Information System (INIS)

    Rhodes, A.K.

    1994-01-01

    The paper gives an assay of West Texas Intermediate, one of the world's market crudes. The price of this crude, known as WTI, is followed by market analysts, investors, traders, and industry managers around the world. WTI price is used as a benchmark for pricing all other US crude oils. The 41 degree API < 0.34 wt % sulfur crude is gathered in West Texas and moved to Cushing, Okla., for distribution. The WTI posted prices is the price paid for the crude at the wellhead in West Texas and is the true benchmark on which other US crudes are priced. The spot price is the negotiated price for short-term trades of the crude. And the New York Mercantile Exchange, or Nymex, price is a futures price for barrels delivered at Cushing

  17. Angiostrongylus cantonensis Meningitis and Myelitis, Texas, USA.

    Science.gov (United States)

    Al Hammoud, Roukaya; Nayes, Stacy L; Murphy, James R; Heresi, Gloria P; Butler, Ian J; Pérez, Norma

    2017-06-01

    Infection with Angiostrongylus cantonensis roundworms is endemic in Southeast Asia and the Pacific Basin. A. cantonensis meningitis and myelitis occurred in summer 2013 in a child with no history of travel outside of Texas, USA. Angiostrongyliasis is an emerging neurotropic helminthic disease in Texas and warrants increased awareness among healthcare providers.

  18. Enrollment in Texas Public Schools, 2014-15

    Science.gov (United States)

    Texas Education Agency, 2016

    2016-01-01

    This report provides information on enrollment in the Texas public school system from the 2004-05 through 2014-15 school years, based on data collected through the Texas Public Education Information Management System. Enrollment data are provided by grade, race/ethnicity, gender, and economically disadvantaged status, and for special populations…

  19. Enrollment in Texas Public Schools, 2015-16

    Science.gov (United States)

    Texas Education Agency, 2016

    2016-01-01

    This report provides information on enrollment in the Texas public school system from the 2005-06 through 2015-16 school years, based on data collected through the Texas Public Education Information Management System. Enrollment data are provided by grade, race/ethnicity, gender, and economically disadvantaged status, and for special populations…

  20. Texas' forests, 2008

    Science.gov (United States)

    James W. Bentley; Consuelo Brandeis; Jason A. Cooper; Christopher M. Oswalt; Sonja N. Oswalt; KaDonna Randolph

    2014-01-01

    This bulletin describes forest resources of the State of Texas at the time of the 2008 forest inventory. This bulletin addresses forest area, volume, growth, removals, mortality, forest health, timber product output, and the economy of the forest sector.

  1. Texas Instruments : Veiligheid is niet iets om over te stemmen

    NARCIS (Netherlands)

    Blijswijk, M. van; Pennekamp, E.

    1990-01-01

    In dit artikel wordt het VGW-beleid bij Texas Instruments beschreven. Hiertoe zijn interviews gehouden met B. Veekamp, hoofd opleidingen bij Texas Instruments Holland BV (TIH) en de J. Stapel, voorzitter van de VGW-commissie. Occupational health and safety policy of Texas Instruments Holland B.V.

  2. Liquid radwaste processing south Texas style

    International Nuclear Information System (INIS)

    Rejcek, M.F.

    1996-01-01

    To reduce the amount of liquid radwaste discharged to the on-site cooling reservoir and to control the rising cost of solid radwaste disposal, the South Texas Project Electric Generating Station (STPEGS) embarked on an effort in mid-1992 to improve the efficiency of liquid radwaste processing. STPEGS has achieved reductions in liquid volumes processed and reduced radwaste curie effluent while also reducing solid radwaste generation and cutting operating cost. Equipment and operating improvements were initially focused on improving the station's liquid radwaste filtration capability. These resulted in radwaste processing which required minimal use of demineralization. This paper will focus on procedural and monitoring improvements. Some of the elements of a liquid radwaste process improvement program are: (1) Dedicated Program Management, (2) Operational Management, (3) Outage Water Management,(4) Non-Radioactive Volume Reduction, and (5) Radwaste Volume ampersand Source Reduction

  3. Investigation of ground-water contamination at a drainage ditch, Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, 2005–06

    Science.gov (United States)

    Vroblesky, Don A.; Casey, Clifton C.

    2007-01-01

    The U.S. Geological Survey, in cooperation with the Naval Facilities Engineering Command Southeast, used newly developed sampling methods to investigate ground-water contamination by chlorobenzenes beneath a drainage ditch on the southwestern side of Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, during 2005-06. The drainage ditch, which is a potential receptor for ground-water contaminants from Installation Restoration Site 4, intermittently discharges water to Corpus Christi Bay. This report uses data from a new type of pore-water sampler developed for this investigation and other methods to examine the subsurface contamination beneath the drainage ditch. Analysis of ground water from the samplers indicated that chlorobenzenes (maximum detected concentration of 160 micrograms per liter) are present in the ground water beneath the ditch. The concentrations of dissolved oxygen in the samples (less than 0.05-0.4 milligram per liter) showed that the ground water beneath and near the ditch is anaerobic, indicating that substantial chlorobenzene biodegradation in the aquifer beneath the ditch is unlikely. Probable alternative mechanisms of chlorobenzene removal in the ground water beneath the drainage ditch include sorption onto the organic-rich sediment and contaminant depletion by cattails through uptake, sorption, and localized soil aeration.

  4. Site characterization and validation - Final report

    International Nuclear Information System (INIS)

    Olsson, O.

    1992-04-01

    The central aims of the Site Characterization and Validation (SCV) project were to develop and apply; * an advanced site characterization methodology and * a methodology to validate the models used to describe groundwater flow and transport in fractured rock. The basic experiment within the SCV project was to predict the distribution of water flow and tracer transport through a volume of rock, before and after excavation of a sub-horizontal drift, and to compare these predictions with actual field measurements. A structured approach was developed to combine site characterization data into a geological and hydrogeological conceptual model of a site. The conceptual model was based on a binary description where the rock mass was divided into 'fracture zones' and 'averagely fractured rock'. This designation into categories was based on a Fracture Zone Index (FZI) derived from principal component analysis of single borehole data. The FZI was used to identify the location of fracture zones in the boreholes and the extent of the zones between the boreholes was obtained form remote sensing data (radar and seismics). The consistency of the geometric model thus defined, and its significance to the flow system, was verified by cross-hole hydraulic testing. The conceptual model of the SCV site contained three major and four minor fractures zones which were the principal hydraulic conduits at the site. The location and extent of the fracture zones were included explicitly in the flow and transport models. Four different numerical modelling approaches were pursued within the project; one porous medium approach, two discrete fracture approaches, and an equivalent discontinuum approach. A series of tracer tests was also included in the prediction-validation exercise. (120 refs.) (au)

  5. CENSUS AND STATISTICAL CHARACTERIZATION OF SOIL AND WATER QUALITY AT ABANDONED AND OTHER CENTRALIZED AND COMMERCIAL DRILLING-FLUID DISPOSAL SITES IN LOUISIANA, NEW MEXICO, OKLAHOMA, AND TEXAS

    Energy Technology Data Exchange (ETDEWEB)

    Alan R. Dutton; H. Seay Nance

    2003-06-01

    Commercial and centralized drilling-fluid disposal (CCDD) sites receive a portion of spent drilling fluids for disposal from oil and gas exploration and production (E&P) operations. Many older and some abandoned sites may have operated under less stringent regulations than are currently enforced. This study provides a census, compilation, and summary of information on active, inactive, and abandoned CCDD sites in Louisiana, New Mexico, Oklahoma, and Texas, intended as a basis for supporting State-funded assessment and remediation of abandoned sites. Closure of abandoned CCDD sites is within the jurisdiction of State regulatory agencies. Sources of data used in this study on abandoned CCDD sites mainly are permit files at State regulatory agencies. Active and inactive sites were included because data on abandoned sites are sparse. Onsite reserve pits at individual wells for disposal of spent drilling fluid are not part of this study. Of 287 CCDD sites in the four States for which we compiled data, 34 had been abandoned whereas 54 were active and 199 were inactive as of January 2002. Most were disposal-pit facilities; five percent were land treatment facilities. A typical disposal-pit facility has fewer than 3 disposal pits or cells, which have a median size of approximately 2 acres each. Data from well-documented sites may be used to predict some conditions at abandoned sites; older abandoned sites might have outlier concentrations for some metal and organic constituents. Groundwater at a significant number of sites had an average chloride concentration that exceeded nonactionable secondary drinking water standard of 250 mg/L, or a total dissolved solids content of >10,000 mg/L, the limiting definition for underground sources of drinking water source, or both. Background data were lacking, however, so we did not determine whether these concentrations in groundwater reflected site operations. Site remediation has not been found necessary to date for most abandoned

  6. Making Texas Restaurants Healthier for Children

    Centers for Disease Control (CDC) Podcasts

    2014-12-30

    Sylvia Crixell, PhD, RD, Professor of Nutrition at Texas State University, discusses her study which details the success of a community-based program in Texas aimed at combatting childhood obesity by improving children’s menus in restaurants.  Created: 12/30/2014 by Preventing Chronic Disease (PCD), National Center for Chronic Disease Prevention and Health Promotion (NCCDPHP).   Date Released: 12/30/2014.

  7. Final Environmental Assessment for the Closure of the Garland ANG Station 254th Combat Communications Group Garland, Texas

    Science.gov (United States)

    2009-07-01

    Rec~ td <if J)ecision (ROD) Final step:in the EIS process. It iS a concise_ public doctunent that sets fNth the.decisioll, identifies the...associated with a site to cnsme Lh<lt 1 111 111 I ui p11i li!l\\’.111 d u lliJ ’·’·’IJI d.u llJ lll iutlut.lL iLtluu li ll ~~.•udu lLJ u JJJLLJ JuguJ i11 u

  8. Overview: Texas College and Career Readiness Standards

    Science.gov (United States)

    Texas Higher Education Coordinating Board, 2009

    2009-01-01

    The Texas College and Career Readiness Standards define what students should know and be able to accomplish in order to succeed in entry-level college courses or skilled workforce opportunities upon graduation from high school. This paper answers the following questions: (1) Who developed the Texas College and Career Readiness Standards?; (2) What…

  9. Enrollment in Texas Public Schools, 2016-17

    Science.gov (United States)

    Texas Education Agency, 2017

    2017-01-01

    This report provides information on enrollment in the Texas public school system from the 2006-07 through 2016-17 school years, based on data collected through the Texas Student Data System. Enrollment data are provided by grade, race/ethnicity, gender, and economically disadvantaged status, and for special populations and instructional programs.…

  10. Preliminary site characterization - final report

    Energy Technology Data Exchange (ETDEWEB)

    Clark, D.; Smith, L.B.

    1993-12-01

    This report summarizes the ecological unit reconnaissance conducted at the F-Area Burning/Rubble Pit(s) RCRA/CERCLA Unit (F-Area BRP) on August 30 and 31, 1993 as part of the RFI/RI baseline risk assessment for the waste unit The baseline risk assessment will assess the potential endangerment to human health and the environment associated with the unit and will be used to evaluate remediation criteria, if needed. The information presented in this report will be used in subsequent stages of the ecological risk assessment to refine the conceptual site model, assist in the selection of contaminants of concern, identify potential ecological receptors, and evaluate trophic relationships and other exposure pathways. The unit reconnaissance survey was conducted in accordance with Specification No. E-18272, Rev. 1 dated August 5, 1993, and the Draft {open_quotes}Ecological Risk Assessment Program Plan for Evaluation of Waste Sites on the Savannah River Site{close_quotes}. The objectives of the site reconnaissance were to: Assess the general characteristics of on-unit biological communities including mammals, birds, reptiles, amphibians, and any aquatic communities present. Determine the location, extent, and characteristics of on-unit ecological resources, such as forested areas and wetlands, that could serve as important wildlife habitat or provide other ecological functions. Identify any overt effects of contamination on biological communities. The field investigations included mapping and describing all wetland and terrestrial habitats; recording wildlife observations of birds, mammals, and reptiles; and investigating ecological resources in nearby downgradient and downstream areas which could be affected by mobile contaminants or future remedial actions. In preparation for the field investigation, existing unit information including aerial photographs and reports were reviewed to help identify and describe ecological resources at the waste unit.

  11. Site characterization plan: Gulf Coast salt domes

    International Nuclear Information System (INIS)

    1983-12-01

    The National Waste Terminal Storage (NWTS) program of the US Department of Energy (DOE) is responsible for developing technology and providing facilities for safe, environmentally acceptable, permanent disposal of high-level nuclear waste. The Office of Nuclear Waste Isolation has been intensively investigating Gulf Coast Salt Dome Basin salt domes and bedded salt in Texas and Utah since 1978. In the Gulf Coast, the application of screening criteria in the region phase led to selection of eight domes for further study in the location phase. Further screening in the area phase identified four domes for more intensive study in the location phase: Oakwood Dome, Texas; Vacherie Dome, Louisiana; and Richton Dome and Cypress Creek Dome, Mississippi. For each dome, this Site Characterization Plan identifies specific hydrologic, geologic, tectonic, geochemical, and environmental key issues that are related to the DOE/NWTS screening criteria or affect the feasibility of constructing an exploratory shaft. The Site Characterization Plan outlines studies need to: (1) resolve issues sufficiently to allow one or more salt domes to be selected and compared to bedded salt sites in order to determine a prime salt site for an exploratory shaft; (2) conduct issue-related studies to provide a higher level of confidence that the preferred salt dome site is viable for construction of an exploratory shaft; and (3) provide a vehicle for state input to issues. Extensive references, 7 figures, 20 tables

  12. Co-benefits of utilizing logging residues for bioenergy production: The case for East Texas, USA

    International Nuclear Information System (INIS)

    Gan, Jianbang; Smith, C.T.

    2007-01-01

    This study evaluated the co-benefits associated with the utilization of logging residues for electricity production in East Texas, USA. The benefits evaluated included the value of CO 2 emissions displaced due to substituting logging residues for coal in power generation, reductions in site preparation costs during forest regeneration, and creation of jobs and income in local communities. Based on the 2004 Forest Inventory Analysis data and a 70% biomass recovery rate, annual recoverable logging residues in East Texas were estimated at 1.3 Mt (dry). These residues, if used for electricity production, would displace about 2.44 Mt of CO 2 , valued at some 9M$ at the current CO 2 price traded at the Chicago Climate Exchange (accounting for about 2% of the stumpage value). Removing logging residues would also save $200-250 ha -1 in site preparation costs. In addition, input-output modeling revealed that logging residue procurement and electricity generation together would have a stronger ripple effect on employment than on output or value-added, with about 1340 new jobs created and 215M$ in value-added generated annually. These results offer new insights into the cost-competitiveness of forest biomass and bioenergy production. (author)

  13. Wastewater Disposal Wells, Fracking, and Environmental Injustice in Southern Texas.

    Science.gov (United States)

    Johnston, Jill E; Werder, Emily; Sebastian, Daniel

    2016-03-01

    To investigate race and poverty in areas where oil and gas wastewater disposal wells, which are used to permanently inject wastewater from hydraulic fracturing (fracking) operations, are permitted. With location data of oil and gas disposal wells permitted between 2007 and 2014 in the Eagle Ford area, a region of intensive fracking in southern Texas, we analyzed the racial composition of residents living less than 5 kilometers from a disposal well and those farther away, adjusting for rurality and poverty, using a Poisson regression. The proportion of people of color living less than 5 kilometers from a disposal well was 1.3 times higher than was the proportion of non-Hispanic Whites. Adjusting for rurality, disposal wells were 2.04 times (95% confidence interval = 2.02, 2.06) as common in areas with 80% people of color or more than in majority White areas. Disposal wells are also disproportionately sited in high-poverty areas. Wastewater disposal wells in southern Texas are disproportionately permitted in areas with higher proportions of people of color and residents living in poverty, a pattern known as "environmental injustice."

  14. Predicting daily PM2.5 concentrations in Texas using high-resolution satellite aerosol optical depth.

    Science.gov (United States)

    Zhang, Xueying; Chu, Yiyi; Wang, Yuxuan; Zhang, Kai

    2018-08-01

    The regulatory monitoring data of particulate matter with an aerodynamic diameter images retrieved from the Moderate Resolution Imaging Spectroradiometer (MODIS) satellites. We then developed mixed-effects models based on AODs, land use features, geographic characteristics, and weather conditions, and the day-specific as well as site-specific random effects to estimate the PM 2.5 concentrations (μg/m 3 ) in the state of Texas during the period 2008-2013. The mixed-effects models' performance was evaluated using the coefficient of determination (R 2 ) and square root of the mean squared prediction error (RMSPE) from ten-fold cross-validation, which randomly selected 90% of the observations for training purpose and 10% of the observations for assessing the models' true prediction ability. Mixed-effects regression models showed good prediction performance (R 2 values from 10-fold cross validation: 0.63-0.69). The model performance varied by regions and study years, and the East region of Texas, and year of 2009 presented relatively higher prediction precision (R 2 : 0.62 for the East region; R 2 : 0.69 for the year of 2009). The PM 2.5 concentrations generated through our developed models at 1-km grid cells in the state of Texas showed a decreasing trend from 2008 to 2013 and a higher reduction of predicted PM 2.5 in more polluted areas. Our findings suggest that mixed-effects regression models developed based on MAIAC AOD are a feasible approach to predict ground-level PM 2.5 in Texas. Predicted PM 2.5 concentrations at the 1-km resolution on a daily basis can be used for epidemiological studies to investigate short- and long-term health impact of PM 2.5 in Texas. Copyright © 2017 Elsevier B.V. All rights reserved.

  15. 77 FR 4368 - Abbott Laboratories, Diagnostics Division, Including On-Site Leased Workers From Manpower...

    Science.gov (United States)

    2012-01-27

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-75,201] Abbott Laboratories..., applicable to workers of Abbott Laboratories, Diagnostics Division, including on-site leased workers from... (clerical) were employed on-site at the Irving, Texas location of Abbott Laboratories, Diagnostics Division...

  16. An Analysis of Laboratory Safety in Texas.

    Science.gov (United States)

    Fuller, Edward J.; Picucci, Ali Callicoatte; Collins, James W.; Swann, Philip

    This paper reports on a survey to discover the types of laboratory accidents that occur in Texas public schools, the factors associated with such accidents, and the practices of schools with regard to current laboratory safety requirements. The purpose of the survey is to better understand safety conditions in Texas public schools and to help…

  17. Confronting the Graduation Rate Crisis in Texas

    Science.gov (United States)

    Losen, Daniel; Orfield, Gary; Balfanz, Robert

    2006-01-01

    The most accurate method for tracking high school graduation rates is to provide each student with a single lifetime school identification number that would follow him or her throughout his or her entire school career. Texas has this system in place, but this report demonstrates that the official rates Texas has historically reported dramatically…

  18. Redmedial Action Plan for the Risk-Based Remediation of Site ST14 (SWMU 68), LPSTID 104819; the Former Base Refueling Area (A0C7); the French Underdrain System (SWMU 64); and the North Oil/Water Separator (SWMU 67), Carswell Air Force Base, Naval Air Station Fort Worth Joint Reserve Base, Texas. Volume 1: Report

    National Research Council Canada - National Science Library

    1997-01-01

    ...) to prepare a remedial action plan (RAP) in support of a risk-based remediation decision for soil and groundwater contaminated with fuel hydrocarbons at Site ST14 at Carswell Air Force Base (AFB), Texas...

  19. Geologic setting and geochemistry of thermal water and geothermal assessment, Trans-Pecos Texas. Final report, June 1, 1976-May 31, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Henry, C.D.

    1977-01-01

    Hot springs and wells in West Texas and adjacent Mexico are manifestations of active convective geothermal systems, concentrated in a zone along the Rio Grande between the Quitman Mountains and Big Bend National Park. Maximum temperatures are 47/sup 0/ and 72/sup 0/C for hot springs and wells in Texas and 90/sup 0/C for hot springs in Mexico within 5 km of the border. Existing information is summarized and the results of a 1-year intensive study of the area are presented. The study includes several overlapping phases: (1) compilation of existing geologic information, both regional studies of geology, structure and geophysics, and more detailed local studies of individual hot spring areas; (2) detailed geologic mapping of hot spring areas to understand the origin and geologic controls of hot springs; (3) field measurement and sampling of hot spring or well waters for geochemical analysis; and (4) synthesis and interpretation of the data.

  20. Siting the superconducting super collider

    International Nuclear Information System (INIS)

    Price, R.; Rooney, R.C.

    1988-01-01

    At the request of the Department of Energy, the National Academy of Sciences and the National Academy of Engineering established the Super Collider Site Evaluation Committee to evaluate the suitability of proposed sites for the Superconducting Super Collider. Thirty-six proposals were examined by the committee. Using the set of criteria announced by DOE in its Invitation for Site Proposals, the committee identified eight sites that merited inclusion on a ''best qualified list.'' The list represents the best collective judgment of 21 individuals, carefully chosen for their expertise and impartiality, after a detailed assessment of the proposals using 19 technical subcriteria and DOE's life cycle cost estimates. The sites, in alphabetical order, are: Arizona/Maricopa; Colorado; Illinois; Michigan/Stockbridge; New York/Rochester; North Carolina; Tennessee; and Texas/Dallas-Fort Worth. The evaluation of these sites and the Superconducting Super Collider are discussed in this book

  1. The Relationship between Pedagogical Beliefs and Teacher Efficacy: A Case Study of Chinese Foreign Language Teachers in Texas

    Science.gov (United States)

    Liu, I-Chun

    2012-01-01

    This study investigated an emerging language learning culture by examining the relationship between teachers' pedagogical beliefs and perceived efficacy in two cities in southern Texas. Drawing on Bandura's (1994) theory of self-efficacy and Ashton and Webb's (1986) notions about teacher efficacy, a multi-sited case study was conducted to explore…

  2. Stakeholder involvement and public outreach at two Department of Energy sites

    International Nuclear Information System (INIS)

    Gray, R.H.

    1996-01-01

    Outreach efforts at two U.S. Department of Energy sites (i.e., the Hanford Site in southeastern Washington and Pantex Plant in the Texas panhandle) have involved a broad spectrum of communications media, including technical presentations and articles, information brochures and fact sheets, video productions; interactive exhibits; presentations at civic and other public meetings; and proactive interactions with the news media, regulators and concerned citizens. In addition, representatives of local communities operate offsite environmental monitoring stations and Native Americans are involved in studying cultural resources, fisheries, and other issues at Hanford, and a program to obtain environmental samples from neighbors property is underway at Pantex. All major environmental programs (e.g., the reconstruction of past radiological doses to offsite human populations at Hanford) are conducted with open public participation, the Pantex Plant has opened an Information office in Amarillo, Texas, and both sites now have Citizen's Advisory Boards. This presentation describes Hanford and Pantex public outreach and involvement efforts, our successes and failures, and the lessons learned

  3. Measurement of volatile organic compounds during start-up of bioremediation of French limited superfund site in Crosby Texas using wind dependent whole-air sampling

    International Nuclear Information System (INIS)

    Pleil, J.D.; Fortune, C.R.; Yoong, M.; Oliver, K.D.

    1993-01-01

    Whole-air sampling was performed before and after the start-up of the bioremediation of an industrial (primarily petrochemical) waste lagoon in Crosby Texas, near Houston. Four 'Sector Samplers' were deployed at the four corners of the French Limited Superfund Site. These samplers collect air into one of two SUMMA polished canisters depending upon wind direction and speed. When the wind blows at the sampler from across the waste lagoon, air is routed to the 'IN' sector canister, otherwise sample is collected in the 'OUT' sector canister. As such, each sampler provides its own background sample, and, upon gas chromatographic analysis, individual compounds can be associated with the waste lagoon. Five sets of 24-hour sector samples were taken; the first set was collected prior to the start of the bioremediation effort and the remaining four sets were taken sequentially for four 24-hour periods after the start-up of the procedure

  4. Site study plan for cultural resources, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Cultural Resources Site Study Plan describes a field program to identify and evaluate the archaeological, historical, and Native American Indian resources of the site on local and regional perspectives; monitor and manage discovered cultural resources; and establish a worker education program. The archaeological field program consists of three pedestrian surveys: Survey 1 includes two EDBH seismic survey lines and the area within the exploratory shaft facility (ESF); Survey 2 includes the remainder of the site plus a 1/4 to 3/4-mi border area; and Survey 3 includes an assortment of offsite areas. The historical studies will identify and evaluate known and discovered historical sites and structures and the Native American Indian will identify and evaluate cultural and religious concerns expressed by Indian tribal groups. Prehistoric and historic sites will be evaluated to determine if they meet eligibility criteria for listing on the National Register of Historic Places. This site study plan describes the need for each study; its design and design rationale; analysis, management, and use of data; schedule of field activities; organization of field personnel and sample management; and quality assurance requirements. The cultural resource studies will provide data for satisfying the Programmatic Agreement, engineering design needs, and SRP requirements for permits and approvals, and for minimizing effects to any cultural properties discovered during site characterization. 75 refs., 10 figs., 2 tabs

  5. 75 FR 18200 - Enterprise Texas Pipeline LLC; Notice of Compliance Filing

    Science.gov (United States)

    2010-04-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR07-12-005] Enterprise..., Enterprise Texas Pipeline LLC (Enterprise Texas), filed its Statement of Operating Conditions in compliance... Commission's regulations. Enterprise Texas states that the revisions include modifications consistent with...

  6. 75 FR 18496 - Enterprise Texas Pipeline LLC; Notice of Compliance Filing

    Science.gov (United States)

    2010-04-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR07-12-005] Enterprise..., Enterprise Texas Pipeline LLC (Enterprise Texas), filed its Statement of Operating Conditions in compliance... Commission's regulations. Enterprise Texas states that the revisions include modifications consistent with...

  7. Organizational Behavior Analysis Focusing on the University of Texas System

    Science.gov (United States)

    Terry, Bobby K.

    2011-01-01

    This project analyzes the organizational behavior of the University of Texas System. The University of Texas System is comprised of nine academic and six health institutions. The University of Texas System has over 85,000 employees; the student enrollment is 202,240 with a budget of $2.25 billion dollars. This project has a total of four parts and…

  8. Texas turns on lignite

    International Nuclear Information System (INIS)

    Faulkner, T.

    1992-01-01

    The paper describes the author's involvement with the Texas Mining and Reclamation Association (TMRA) and some of its activities. The mission of TMRA is to solidify the needs and opinions of the various mining sectors into one voice which can be heard on the vital matters of balance between mineral production, environmental protection, economic strength and public welfare. To make this voice effective, TMRA will present the mining industry - and its value to the Texas economy and lifestyle - to the public, educators and students, regulatory officials, legislators and to the media to enhance their understanding. TMRA will promote the active participation of its members in association affairs and strive for integrity, clarity and vision throughout all its operations and activities

  9. Data-Driven Research and Site-Based Management.

    Science.gov (United States)

    Karr-Kidwell, PJ; Beauchamp, Deanna

    This paper reports on a field research project designed to provide staff members of one particular Texas middle school the knowledge and ability to affect student attendance. The purpose of the field research was to identify effective strategies, led by site-based management teams, to enhance student attendance. Data were collected from a review…

  10. Detailed site characterization for final disposal of spent fuel in Finland - Case study Loviisa

    International Nuclear Information System (INIS)

    Anttila, P.; Ahokas, H.; Ruotsalainen, P.; Cosma, C.; Keskinen, J.; Hinkkanen, H.; Rouhiainen, P.; Oehberg, A.

    1998-01-01

    The spent fuel from the Finnish nuclear power plants will be disposed of in the Finnish bedrock. Pos iva Oy is responsible for the site selection programme carried out in accordance with the governmental decisions. Preliminary site investigations were made in five areas in 1987-1992. Based on the results, three areas, Romuvaara in Kuhmo, Kivetty in Aeaenekoski and Olkiluoto in Eurajoki, were selected for the detailed site characterization in 1993-2000. The final site will be selected by the end of the year 2000. The interim reporting of the detailed studies of the three areas was made in 1996. In 1997, the island of Haestholmen, as the host to the Loviisa NPP, was included as a fourth candidate site in the programme for the detailed site investigations. The goal is to characterize this site also in detail by the end of 2000 to attain the same level of knowledge as available from the three other sites. The background information existing from the studies made for the construction of the repository for the low-and intermediate-level wastes will create a good basis to reach the target. The research programme for the detailed site characterization has mainly been focused on groundwater flow and geochemistry due to their importance in terms of long-term safety of the repository. Equipment and methodology development by Posiva has introduced new tools that provide more accurate data on relevant parameters than the ones used in previous stages of site characterization. The programme also contains studies for additional information of the structural and geological properties of the bedrock towards the depth. Also predictive modelling has been made for evaluating the relevance of the assumptions made. The methods applied in the site characterization have comprised, e.g., geological mapping, deep core drilling, groundwater sampling and analyzing, hydraulic testing and geophysical measurements

  11. Detailed site characterization for final disposal of spent fuel in Finland - Case study Loviisa

    Energy Technology Data Exchange (ETDEWEB)

    Anttila, P. [IVO Power Engineering Ltd. (Finland); Ahokas, H.; Ruotsalainen, P. [Fintact Oy (Finland); Cosma, C.; Keskinen, J. [Vibrometric Oy (Finland); Hinkkanen, H. [Posiva Oy (Finland); Rouhiainen, P. [PRG-Tec Oy (Finland); Oehberg, A. [Saanio and Riekkola Consulting Engineers (Finland)

    1998-09-01

    The spent fuel from the Finnish nuclear power plants will be disposed of in the Finnish bedrock. Pos iva Oy is responsible for the site selection programme carried out in accordance with the governmental decisions. Preliminary site investigations were made in five areas in 1987-1992. Based on the results, three areas, Romuvaara in Kuhmo, Kivetty in Aeaenekoski and Olkiluoto in Eurajoki, were selected for the detailed site characterization in 1993-2000. The final site will be selected by the end of the year 2000. The interim reporting of the detailed studies of the three areas was made in 1996. In 1997, the island of Haestholmen, as the host to the Loviisa NPP, was included as a fourth candidate site in the programme for the detailed site investigations. The goal is to characterize this site also in detail by the end of 2000 to attain the same level of knowledge as available from the three other sites. The background information existing from the studies made for the construction of the repository for the low-and intermediate-level wastes will create a good basis to reach the target. The research programme for the detailed site characterization has mainly been focused on groundwater flow and geochemistry due to their importance in terms of long-term safety of the repository. Equipment and methodology development by Posiva has introduced new tools that provide more accurate data on relevant parameters than the ones used in previous stages of site characterization. The programme also contains studies for additional information of the structural and geological properties of the bedrock towards the depth. Also predictive modelling has been made for evaluating the relevance of the assumptions made. The methods applied in the site characterization have comprised, e.g., geological mapping, deep core drilling, groundwater sampling and analyzing, hydraulic testing and geophysical measurements 23 refs, 4 figs

  12. Small mammal populations at hazardous waste disposal sites near Houston, Texas, USA

    Science.gov (United States)

    Robbins, C.S.

    1990-01-01

    Small mammals were trapped, tagged and recaptured in 0?45 ha plots at six hazardous industrial waste disposal sites to determine if populations, body mass and age structures were different from paired control site plots. Low numbers of six species of small mammals were captured on industrial waste sites or control sites. Only populations of hispid cotton rats at industrial waste sites and control sites were large enough for comparisons. Overall population numbers, age structure, and body mass of adult male and female cotton rats were similar at industrial waste sites and control sites. Populations of small mammals (particularly hispid cotton rats) may not suffice as indicators of environments with hazardous industrial waste contamination.

  13. Ecohydrological Responses to Hurricane Harvey across South-Central Texas a Multidisciplinary Approach of the Texas Water Observatory

    Science.gov (United States)

    Jaimes, A.; Gaur, N.; Aparecido, L. M. T.; Everett, M. E.; Knappett, P.; Lawing, M.; Majumder, S.; Miller, G. R.; Moore, G. W.; Morgan, C.; Mitra, B.; Noormets, A.; Mohanty, B.

    2017-12-01

    The unprecedented destructive hurricane Harvey struck eastern Texas from August 25th to 29th, 2017. As the hurricane moved through the region, it dropped the equivalent of one year of precipitation within a five-day period, with peak accumulations near 165 cm. Rainfall intensity and distribution varied across the region but Harris County and portions of the lower Brazos River Basin experienced devastating flooding due to high run-off and water accumulation in the built-up area. In this study, we use a multidisciplinary approach to quantify the dynamics of carbon and water flux at different spatiotemporal resolution across land types both in and outside of the path of hurricane Harvey using a combination of remote sensing and fixed monitoring platforms of the Texas Water Observatory (TWO). We used LANDSAT imagery to compute Soil Adjusted Vegetation Index, Enhanced Vegetation Index, and Normalized Difference Moisture Index. MODIS ET, GPP, and sap flow data were used in combination with eddy covariance and meteorological data from seven sites of the TWO representative of biomes ranging from low tidal salt marsh of the Gulf Coastal Plain, Shrubland, Improved Pasture, Mixed and Native Prairies, and Crop sites. We hypothesize alteration in ecohydrological characteristics across land types, which were in the path of hurricane due to changes in vegetation structure. Specifically we used trend analysis to detect structural changes in temporal dynamics of sap flow, ET, and carbon to pulse response. In addition, we monitored trace metal concentration of soil and water pores before and immediately after the hurricane in order to predict the potential of any of the toxic metal (loid)s being mobilized in the natural water resources as a function of the changes in the redox gradient. Preliminary results indicated that tree water use was reduced on average 30% below normal days. Porewater concentration of some of the metal (loid) concentration increased (Fe, Mn, Co, As, Sb, Pb

  14. The satellite symposium of the 2nd COE-INES international symposium, INES-2 on 'final disposal sites: How were they determined?'

    International Nuclear Information System (INIS)

    2007-03-01

    The symposium was organized on December 1, 2006, by Tokyo Institute of Technology in charge of the 21st century COE program to establish innovative nuclear energy systems for sustainable development of the world. It was aimed at finding the process of determining the final radioactive waste disposal sites of Japan through a comprehensive and interdisciplinary approach. Four guests, 2 from Finland and 2 from Korea each one from the promoting side and the other from the local governmental side, were invited from the two countries that have already determined the sites through the necessary processes to find the consensus. Participants were 103 including 7 from abroad. The symposium consisted of plenary lectures: Regulators' Role in Development of Finnish Nuclear Waste Disposal Program, and A Successful Case Site Selection for Low- and Intermediate-Level Radioactive Waste Disposal Facility, Site Selection for LILW Disposal Facility in Korea, Public Participations in the Selection and Acceptance of Olkiluoto Site for the Final Disposal of Spent Nuclear Fuel in Finland and, continuously, a panel discussion to find what are the key problems in solving the final disposal site selection in Japan and what will play a major role towards the solution of this important issues. The report includes all the lectures with diagrams and the records of questions and answers. (S. Ohno)

  15. 76 FR 73618 - Enterprise Texas Pipeline LLC; Notice of Compliance Filing

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. PR11-92-001] Enterprise Texas Pipeline LLC; Notice of Compliance Filing Take notice that on November 22, 2011, Enterprise Texas Pipeline LLC (Enterprise Texas) filed a revised Statement of Operating Conditions to comply with a...

  16. Paleocene coal deposits of the Wilcox group, central Texas

    Science.gov (United States)

    Hook, Robert W.; Warwick, Peter D.; SanFilipo, John R.; Schultz, Adam C.; Nichols, Douglas J.; Swanson, Sharon M.; Warwick, Peter D.; Karlsen, Alexander K.; Merrill, Matthew D.; Valentine, Brett J.

    2011-01-01

    Coal deposits in the Wilcox Group of central Texas have been regarded as the richest coal resources in the Gulf Coastal Plain. Although minable coal beds appear to be less numerous and generally higher in sulfur content (1 percent average, as-received basis; table 1) than Wilcox coal deposits in the Northeast Texas and Louisiana Sabine assessment areas (0.5 and 0.6 percent sulfur, respectively; table 1), net coal thickness in coal zones in central Texas is up to 32 ft thick and more persistent along strike (up to 15 mi) at or near the surface than coals of any other Gulf Coast assessment area. The rank of the coal beds in central Texas is generally lignite (table 1), but some coal ranks as great as subbituminous C have been reported (Mukhopadhyay, 1989). The outcrop of the Wilcox Group in central Texas strikes northeast, extends for approximately 140 mi between the Trinity and Colorado Rivers, and covers parts of Bastrop, Falls, Freestone, Lee, Leon, Limestone, Milam, Navarro, Robertson, and Williamson Counties (Figure 1). Three formations, in ascending order, the Hooper, Simsboro, and Calvert Bluff, are recognized in central Texas (Figure 2). The Wilcox Group is underlain conformably by the Midway Group, a mudstone-dominated marine sequence, and is overlain and scoured locally by the Carrizo Sand, a fluvial unit at the base of the Claiborne Group.

  17. Electroconvulsive Therapy (ECT) and Race: A Report of ECT Use and Sociodemographic Trends in Texas.

    Science.gov (United States)

    Williams, Julie; Chiu, Lawrence; Livingston, Robin

    2017-06-01

    Minimal research on race and other sociodemographic disparities in patients receiving electroconvulsive therapy (ECT) exists. One previously noted national trend reveals whites receiving ECT disproportionately more than other races. The aim of this study is to determine whether a county ECT program demonstrates similar disparities observed at the state and national levels. This study examined 21 years of ECT data, between 1993 and 2014, provided by the Texas Department of State Health Services, focusing on race, sex, age, and payer source and 2.5 years of the same variables from a Harris County hospital ECT program. In addition, population demographic data for Harris County and the state of Texas during the same period were obtained from the Department of State Health Services Web site. Despite an overall decrease in the population of whites countywide and statewide, whites continue to use more ECT than African Americans, Latinos, and Asians in both Harris County and Texas. However, the rates of ECT use in minorities increased overall. Both countywide and statewide, ECT was used more than twice as often in women than men. Statewide, elderly patients (>65 years old) saw decreases in ECT use, and there was an increase in private third-party payer source. Electroconvulsive therapy remains underused among African Americans, Latinos, and Asians. Hypotheses and areas for future study include cultural beliefs, stigma, patient and provider knowledge of ECT, and access to care. Despite this, the general use of ECT in Texas has increased overall, and minority use is slowly on the rise.

  18. Evaluation of a committed fusion site. Final report

    International Nuclear Information System (INIS)

    1979-07-01

    This report is divided into five technical sections. Section 2 is a summary. In Section 3, which covers device and site analyses the major characteristics of devices that might be placed at the site, as envisioned by major fusion laboratories, are described; the characteristics of a site (baseline site) which would accommodate these devices are defined; and various approaches to a committed site meeting the baseline site requirements are discussed. Section 4 describes the scenarios selected to represent possible site development outcomes; these scenarios are evaluated with respect to comparative cost and schedule effects. Section 5 presents a brief evaluation of the effects fusion-fission hybrids might have on the committed site. Major conclusions and recommendations are discussed in Section 6

  19. Pecan Street Grid Demonstration Program. Final technology performance report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-02-10

    This document represents the final Regional Demonstration Project Technical Performance Report (TPR) for Pecan Street Inc.’s (Pecan Street) Smart Grid Demonstration Program, DE-OE-0000219. Pecan Street is a 501(c)(3) smart grid/clean energy research and development organization headquartered at The University of Texas at Austin (UT). Pecan Street worked in collaboration with Austin Energy, UT, Environmental Defense Fund (EDF), the City of Austin, the Austin Chamber of Commerce and selected consultants, contractors, and vendors to take a more detailed look at the energy load of residential and small commercial properties while the power industry is undergoing modernization. The Pecan Street Smart Grid Demonstration Program signed-up over 1,000 participants who are sharing their home or businesses’s electricity consumption data with the project via green button protocols, smart meters, and/or a home energy monitoring system (HEMS). Pecan Street completed the installation of HEMS in 750 homes and 25 commercial properties. The program provided incentives to increase the installed base of roof-top solar photovoltaic (PV) systems, plug-in electric vehicles with Level 2 charging, and smart appliances. Over 200 participants within a one square mile area took advantage of Austin Energy and Pecan Street’s joint PV incentive program and installed roof-top PV as part of this project. Of these homes, 69 purchased or leased an electric vehicle through Pecan Street’s PV rebate program and received a Level 2 charger from Pecan Street. Pecan Street studied the impacts of these technologies along with a variety of consumer behavior interventions, including pricing models, real-time feedback on energy use, incentive programs, and messaging, as well as the corresponding impacts on Austin Energy’s distribution assets.The primary demonstration site was the Mueller community in Austin, Texas. The Mueller development, located less than three miles from the Texas State Capitol

  20. Nuclear waste: Status of DOE's nuclear waste site characterization activities

    International Nuclear Information System (INIS)

    1987-01-01

    Three potential nuclear waste repository sites have been selected to carry out characterization activities-the detailed geological testing to determine the suitability of each site as a repository. The sites are Hanford in south-central Washington State, Yucca Mountain in southern Nevada, and Deaf Smith in the Texas Panhandle. Two key issues affecting the total program are the estimations of the site characterization completion data and costs and DOE's relationship with the Nuclear Regulatory Commission which has been limited and its relations with affected states and Indian tribes which continue to be difficult

  1. Governance and planning as boundary conditions for flood risk reduction in Texas : Galveston Island’s flood risk challenge

    NARCIS (Netherlands)

    Brand, A.D.; Kothuis, Baukje; Kok, Matthijs

    2017-01-01

    Galveston Island is a barrier island with a population of approximately 60,000, located between Galveston Bay and the Gulf of Mexico on the Texas coast. Due to its location, Galveston is not only on the front line of hurricane-induced storm surges coming from the Gulf, it is also a key site for any

  2. 76 FR 14387 - Texas Eastern Transmission, LP; Notice of Request Under Blanket Authorization

    Science.gov (United States)

    2011-03-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-118-000] Texas Eastern... Eastern Transmission, LP (Texas Eastern), Post Office Box 1642, Houston, Texas 77251-1642, filed in Docket... West Cameron Blocks 566, 565, and 548, offshore Louisiana, under Texas Eastern's blanket certificate...

  3. 77 FR 22773 - Texas Eastern Transmission, L.P.; Notice of Response

    Science.gov (United States)

    2012-04-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Docket No. RP12-318-001] Texas Eastern... order of the Federal Energy Regulatory Commission in the above- captioned proceeding Texas Eastern Transmission, LP (Texas Eastern) submits its response to show cause why it should not be required to file...

  4. ENHANCED CONTROL OF MERCURY BY WET FLUE GAS DESULFURIZATION SYSTEMS; FINAL

    International Nuclear Information System (INIS)

    Unknown

    2001-01-01

    The U.S. Department of Energy and EPRI co-funded this project to improve the control of mercury emissions from coal-fired power plants equipped with wet flue gas desulfurization (FGD) systems. The project has investigated catalytic oxidation of vapor-phase elemental mercury to a form that is more effectively captured in wet FGD systems. If successfully developed, the process could be applicable to over 90,000 MW of utility generating capacity with existing FGD systems, and to future FGD installations. Field tests were conducted to determine whether candidate catalyst materials remain active towards mercury oxidation after extended flue gas exposure. Catalyst life will have a large impact on the cost effectiveness of this potential process. A mobile catalyst test unit was used to test the activity of four different catalyst materials for a period of up to six months each at three utility sites. Catalyst testing was completed at the first site, which fires Texas lignite, in December 1998; at the second test site, which fires a Powder River Basin subbituminous coal, in November 1999; and at the third site, which fires a medium- to high-sulfur bituminous coal, in January 2001. Results of testing at each of the three sites were reported in previous technical notes. At Site 1, catalysts were tested only as powders dispersed in sand bed reactors. At Sites 2 and 3, catalysts were tested in two forms, including powders dispersed in sand and in commercially available forms such as extruded pellets and coated honeycomb structures. This final report summarizes and presents results from all three sites, for the various catalyst forms tested. Field testing was supported by laboratory tests to screen catalysts for activity at specific flue gas compositions, to investigate catalyst deactivation mechanisms and methods for regenerating spent catalysts. Laboratory results are also summarized and discussed in this report

  5. Tornado from Texas.

    Science.gov (United States)

    Vail, Kathleen

    1996-01-01

    Santa Fe School Superintendent Yvonne Gonzales, the "Texas Tornado," was hired to fix a 40% student-dropout rate and a white/Hispanic gap in achievement test scores. Gonzales is an avid integrationist; relies on humor, appeasement, and persuasion tactics; and has alienated some school employees by increasing central office…

  6. Instructional Technology Practices in Developmental Education in Texas

    Science.gov (United States)

    Martirosyan, Nara M.; Kennon, J. Lindsey; Saxon, D. Patrick; Edmonson, Stacey L.; Skidmore, Susan T.

    2017-01-01

    The purpose of this study was to examine the current state of technology integration in developmental education in Texas higher education. Analyzing survey data from developmental education faculty members in 70 2- and 4-year colleges in Texas, researchers identified instructor-reported best instructional technology practices in developmental…

  7. Texas coral snake (Micrurus tener) bites.

    Science.gov (United States)

    Morgan, David L; Borys, Douglas J; Stanford, Rhandi; Kjar, Dean; Tobleman, William

    2007-02-01

    The clinical features of bites from Texas coral snakes (Micrurus tener) have not been well studied. Our goal was to review the largest number of victims of Texas coral snakebites to determine their characteristics, effects, treatment, and outcome. Retrospective case series of Micrurus tener exposures reported to the Texas Poison Center Network from 2000 to 2004. Eighty-two patients were included in the analysis. Most (57.3%) were 18 to 49-year-old men. Almost 90% had local swelling, pain, erythema, or paresthesias. Only 7.3% had systemic effects, and none of these were severe. Over half received coral snake antivenin, and 15.9% were given opioids for pain. No patient died and no patient required mechanical ventilation due to hypoventilation from the snakebite. There were more local findings and less severe systemic effects than previously reported. Antivenin is not needed for most of these patients, and opioids may be administered safely.

  8. Nuclear energy in Texas: major issues and policy recommendations

    International Nuclear Information System (INIS)

    1979-01-01

    On December 15, 1978 the Texas Energy Advisory Council (TEAC) adopted the Texas Energy Policy, 1978 Update. The Council recognized the great complexity of technical, economic, social, and political issues which have an impact on nuclear power, and therefore decided that a special committee was needed to examine in greater detail the nuclear energy issues facing Texas. This report summarizes the work of the Advisory Committee on Nuclear energy. Topics discussed include: biological affects of low levels of radiation; transportation of radioactive material in Texas; uranium mining and milling; severance tax on uranium mining; alternate reactor designs and fuel cycles; financing nuclear plant construction; cost of disposing of nuclear wastes and decommissioning nuclear plants; low-level wastes; disposal of high-level wastes; commercial spent nuclear fuel reprocessing; and transmutation of radioactive wastes

  9. Noise source emissions, Deaf Smith County site, Texas

    International Nuclear Information System (INIS)

    1987-01-01

    Noise source data and use factors for modeling the noise environment expected from salt site repository activity were provided by Battelle Columbus Division. This report has been prepared for the purpose of documenting the development of the data provided to the Repository Project Management (RPM) organization. The data provided encompass all phases of activity from site preparation through construction of the exploratory shaft facility (ESF). Noise environments expected from construction and operation of transportation corridors associated with the activity were also modeled. The equipment inventory, including sound-power levels for each item, is included. Emission source terms provided by Parsons Brinckerhoff/PB-KBB for the ESF were used as a basis for the noise-source emission inventory development. Where available, research results containing complete spectra were used. In cases where complete data were not available, a sound-pressure spectrum was synthesized from a characteristic spectrum shape from a similar piece of equipment. For example, a front-shovel excavator might be approximated by data from a front-end loader of similar horsepower range. Sound-power-level spectra were then calculated from the sound-pressure-level data. 2 refs

  10. Spatially pooled depth-dependent reservoir storage, elevation, and water-quality data for selected reservoirs in Texas, January 1965-January 2010

    Science.gov (United States)

    Burley, Thomas E.; Asquith, William H.; Brooks, Donald L.

    2011-01-01

    The U.S. Geological Survey (USGS), in cooperation with Texas Tech University, constructed a dataset of selected reservoir storage (daily and instantaneous values), reservoir elevation (daily and instantaneous values), and water-quality data from 59 reservoirs throughout Texas. The period of record for the data is as large as January 1965-January 2010. Data were acquired from existing databases, spreadsheets, delimited text files, and hard-copy reports. The goal was to obtain as much data as possible; therefore, no data acquisition restrictions specifying a particular time window were used. Primary data sources include the USGS National Water Information System, the Texas Commission on Environmental Quality Surface Water-Quality Management Information System, and the Texas Water Development Board monthly Texas Water Condition Reports. Additional water-quality data for six reservoirs were obtained from USGS Texas Annual Water Data Reports. Data were combined from the multiple sources to create as complete a set of properties and constituents as the disparate databases allowed. By devising a unique per-reservoir short name to represent all sites on a reservoir regardless of their source, all sampling sites at a reservoir were spatially pooled by reservoir and temporally combined by date. Reservoir selection was based on various criteria including the availability of water-quality properties and constituents that might affect the trophic status of the reservoir and could also be important for understanding possible effects of climate change in the future. Other considerations in the selection of reservoirs included the general reservoir-specific period of record, the availability of concurrent reservoir storage or elevation data to match with water-quality data, and the availability of sample depth measurements. Additional separate selection criteria included historic information pertaining to blooms of golden algae. Physical properties and constituents were water

  11. 76 FR 13610 - Enterprise Texas Pipeline LLC; Notice of Compliance Filing

    Science.gov (United States)

    2011-03-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. PR10-14-002; PR11-92-000] Enterprise Texas Pipeline LLC; Notice of Compliance Filing Take notice that on March 1, 2011, Enterprise Texas Pipeline LLC (Enterprise Texas) filed a revised Statement of Rates to its Statement of Operating...

  12. Nutrition Education and Training Needs in Texas. Nutrition Education and Training Needs Assessment for Federal Fiscal Year 1995. Final Annual Report.

    Science.gov (United States)

    Martin, Ruth E.; Ahmad, Mahassen

    A 3-year needs assessment study examined nutrition knowledge, attitudes, and food practices. Subjects were 135 preschool children ages 3-5 years, 610 parents, 118 day care teachers and providers, 35 food service personnel, and 76 administrators throughout Texas. Registered family day care homes, group day care homes, and day care centers from 11…

  13. Defense Base Realignment and Closure Budget Data for Naval Air Stations Dallas, Texas, and Memphis, Tennessee, Realigning to Carswell Air Reserve Base, Texas

    National Research Council Canada - National Science Library

    Granetto, Paul

    1994-01-01

    .... This report provides the results of the audit of 16 projects, valued at $122 million, for the realignment of the Naval Air Stations Memphis, Tennessee, and Dallas, Texas, to Carswell Air Reserve Base, Texas...

  14. Work and Family Programs in Texas State Agencies.

    Science.gov (United States)

    Texas Work and Family Clearinghouse, Austin.

    A survey of work and family policies in state-supported organizations in Texas was conducted for the Texas Workforce Commission's Work and Family Clearinghouse. Survey questions addressed the prevalence, perceived need, and future direction of dependent care programs and flexible work arrangements (FWA). Key findings in dependent care include: (1)…

  15. 76 FR 25330 - Texas Eastern Transmission, LP; Notice of Request Under Blanket Authorization

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-216-000] Texas Eastern... Eastern Transmission, LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056, filed in Docket No... in the termination of any services to Texas Eastern's customers, all as more fully set forth in the...

  16. Blood lead exposure concentrations in mottled ducks (Anas fulvigula) on the upper Texas coast

    Science.gov (United States)

    McDowell, Stephen K.; Conway, Warren C.; Haukos, David A.; Moon, Jena A.; Comer, Christopher E.; Hung, I-Kuai

    2015-01-01

    The mottled duck (Anas fulvigula) is a non-migratory waterfowl species dependent upon coastal marsh systems, including those on the Texas Chenier Plain National Wildlife Refuge (NWR) Complex, and considered a regional indicator species of marsh habitat quality. Research from the early 1970s, 1990s, and early-2000s indicated that mottled ducks continued to exhibit elevated wing-bone lead (Pb) concentrations, decades after implementation of non-toxic shot regulations. However, wing-bone concentrations reflect lifetime accumulation of Pb, whereas blood Pb concentrations reflect more recent exposure. To identify current potentially relevant temporal windows of Pb exposure, we collected 260 blood samples from mottled ducks during summer (n=124) and winter (n=136) from 2010–2012 on the Texas Chenier Plain NWR Complex. We quantified baseline blood Pb concentrations for all ages of mottled ducks, and hypothesized that blood lead concentrations would remain elevated above background levels (200 µg L–1) despite the 1983 and 1991 lead shot bans. Blood Pb concentrations ranged from below detection limits to >12,000 µg L–1, where >200 µg L–1 was associated with exposure levels above background concentrations. Male mottled ducks had the greatest blood Pb concentrations (30 times greater than females) with concentrations greater during winter than summer. Likewise, the proportion of exposed (>200 µg L–1) females increased from 14%–47% from summer to winter, respectively. Regardless of sex, adult mottled duck blood Pb concentrations were five times greater than juveniles, particularly during winter. We identified five plausible models that influenced blood Pb levels where year, site, and interactions among age*sex*season and between age*season were included in the top-ranked models. Frequency of exposure was greatest during winter, increasing from 12% in summer to 55% in winter, indicating that a temporal exposure window to environmental Pb exists between nesting

  17. The Application of Adaptive Sampling and Analysis Program (ASAP) Techniques to NORM Sites; FINAL

    International Nuclear Information System (INIS)

    Johnson, Robert; Smith, Karen P.; Quinn, John

    1999-01-01

    The results from the Michigan demonstration establish that this type of approach can be very effective for NORM sites. The advantages include (1) greatly reduced per sample analytical costs; (2) a reduced reliance on soil sampling and ex situ gamma spectroscopy analyses; (3) the ability to combine characterization with remediation activities in one fieldwork cycle; (4) improved documentation; and (5) ultimately better remediation, as measured by greater precision in delineating soils that are not in compliance with requirements from soils that are in compliance. In addition, the demonstration showed that the use of real-time technologies, such as the RadInSoil, can facilitate the implementation of a Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM)-based final status survey program

  18. Monitoring work zone safety and mobility impacts in Texas.

    Science.gov (United States)

    2009-05-01

    In this report, Texas Transportation Institute researchers identify key work zone safety and mobility : performance measures that the Texas Department of Transportation (TxDOT) should target as part of a work : zone monitoring program within a distri...

  19. 76 FR 29234 - Texas Eastern Transmission, LP; Notice of Request Under Blanket Authorization

    Science.gov (United States)

    2011-05-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-477-000] Texas Eastern Transmission, LP; Notice of Request Under Blanket Authorization Take notice that on May 10, 2011 Texas Eastern Transmission, LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056, filed in Docket No. CP11-477-000...

  20. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd{sup 3} (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3} (420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations.

  1. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    International Nuclear Information System (INIS)

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd 3 ) (2.1 million cubic meters [m 3 ]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd 3 (15,000 m 3 ) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd 3 (420,000 m 3 ). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd 3 (2.58 million m 3 ). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations

  2. Long-term changes in river system hydrology in Texas

    Directory of Open Access Journals (Sweden)

    Y. Zhang

    2018-06-01

    Full Text Available Climate change and human actives are recognized as a topical issue that change long-term water budget, flow-frequency, and storage-frequency characteristics of different river systems. Texas is characterized by extreme hydrologic variability both spatially and temporally. Meanwhile, population and economic growth and accompanying water resources development projects have greatly impacted river flows throughout Texas. The relative effects of climate change, water resources development, water use, and other factors on long-term changes in river flow, reservoir storage, evaporation, water use, and other components of the water budgets of different river basins of Texas have been simulated in this research using the monthly version of the Water Rights Analysis Package (WRAP modelling system with input databases sets from the Texas Commission on Environmental Quality (TCEQ and Texas Water Development Board (TWDB. The results show that long-term changes are minimal from analysis monthly precipitation depths. Evaporation rates vary greatly seasonally and for much of the state appear to have a gradually upward trend. River/reservoir system water budgets and river flow characteristics have changed significantly during the past 75 years in response to water resources development and use.

  3. Mississippian depositional history of the Texas Panhandle: A reappraisal

    International Nuclear Information System (INIS)

    Ruppel, S.C.

    1988-01-01

    Recent lithostratigraphic and biostratigraphic study of subsurface Mississippian rocks of the Texas Panhandle indicates that previous interpretations of the sequence and timing of depositional events in the area need revision. Early Mississippian (Kinderhookian to Osagean) deposition in the area was restricted to the northeastern Panhandle (Anadarko Basin). The Texas Arch, a Devonian structure, remained positive and effectively limited sediment accumulation throughout the remainder of the area at this time. Major inundation of the southern Panhandle did not occur until the Meramecian. At that time shallow platform conditions developed in the area of the submerged Texas Arch; carbonate buildups formed locally on the outer ramp along the previous margin of the Arch. This marine transgression correlates with drowning of platform margins throughout the midcontinent region. The Texas Arch continued intermittently to control deposition until the end of the Mississippian Period. 20 refs., 2 figs

  4. Spatial Distribution of Estimated Wind-Power Royalties in West Texas

    Directory of Open Access Journals (Sweden)

    Christian Brannstrom

    2015-12-01

    Full Text Available Wind-power development in the U.S. occurs primarily on private land, producing royalties for landowners through private contracts with wind-farm operators. Texas, the U.S. leader in wind-power production with well-documented support for wind power, has virtually all of its ~12 GW of wind capacity sited on private lands. Determining the spatial distribution of royalty payments from wind energy is a crucial first step to understanding how renewable power may alter land-based livelihoods of some landowners, and, as a result, possibly encourage land-use changes. We located ~1700 wind turbines (~2.7 GW on 241 landholdings in Nolan and Taylor counties, Texas, a major wind-development region. We estimated total royalties to be ~$11.5 million per year, with mean annual royalty received per landowner per year of $47,879 but with significant differences among quintiles and between two sub-regions. Unequal distribution of royalties results from land-tenure patterns established before wind-power development because of a “property advantage,” defined as the pre-existing land-tenure patterns that benefit the fraction of rural landowners who receive wind turbines. A “royalty paradox” describes the observation that royalties flow to a small fraction of landowners even though support for wind power exceeds 70 percent.

  5. Prevalence of Trichomonas, Salmonella, and Listeria in Wild Birds from Southeast Texas.

    Science.gov (United States)

    Brobey, Britni; Kucknoor, Ashwini; Armacost, Jim

    2017-09-01

    Infectious diseases can be a major threat to wildlife populations, especially in human-modified habitats, but infection rates in populations of wild animals are often poorly studied. Trichomonas, Salmonella, and Listeria are all pathogens known to infect birds, but their infection rates in wild bird populations are not well documented. This study documents infection rates of the three pathogens in wild bird populations inhabiting a suburban to rural gradient in Southeast Texas. Various species of wild birds were sampled at five sites in Southeastern Texas representing rural (Birds were captured in mist nets and samples were taken from the oral cavity, crop, and vent to detect the presence of pathogens. Samples were screened for Trichomonas by examining wet mounts under a light microscope, whereas samples were screened for Salmonella and Listeria by examining colonies grown on agar plates. Pathogens detected during the initial screening were further confirmed by PCR and DNA sequencing. Infection rates for Trichomonas, Salmonella, and Listeria were 9%, 17%, and 5%, respectively. The distributions of infection rates across habitats (i.e., rural, exurban, rural) did not differ significantly from the expected null distributions for any of the three pathogens; however, the data suggested some interesting patterns that should be confirmed with a larger dataset. Infection rates for Trichomonas and Salmonella were highest at the suburban sites, whereas the infection rate for Listeria was highest at the rural site. Feeder birds were more likely to be infected by all three pathogens than non-feeder birds. Small sample sizes prevent definitive conclusions regarding variation in infection rates along the suburban to rural gradient, but the results suggest that pathogens followed the predicted patterns. For many of the bird species sampled, this study presents the first report of infection rates by these three pathogens in wild populations.

  6. Nuevo Leon during the Independence of Texas, 1835-1836

    Directory of Open Access Journals (Sweden)

    Miguel Ángel González Quiroga

    2006-10-01

    Full Text Available The new-born Mexican Republic suffered one of its strongest shocks in 1836, during the Texas War. The impact of this conflict in the neighbouring state of Nuevo Leon is the main subject of this work, which also describes the situation of Mexico and its army, as well as the state's reaction towards the centralist shift — Texas' main argument  for splitting from Mexico. The study of the separation of Texas, widely reviewed in Mexican historiography, is enriched through the viewpoint of one of the most affected states.

  7. Texas freight 2055 roundtable.

    Science.gov (United States)

    2016-03-01

    Participants were welcomed to the Roundtable discussion and to the Dallas/Fort Worth region by : Mr. Michael Morris (Director of Transportation, North Central Texas Council of Governments : (NCTCOG)). Mr. Morris began his remarks by noting the import...

  8. Permian salt dissolution, alkaline lake basins, and nuclear-waste storage, Southern High Plains, Texas and New Mexico

    International Nuclear Information System (INIS)

    Reeves, C.C. Jr.; Temple, J.M.

    1986-01-01

    Areas of Permian salt dissolution associated with 15 large alkaline lake basins on and adjacent to the Southern High Plains of west Texas and eastern New Mexico suggest formation of the basins by collapse of strata over the dissolution cavities. However, data from 6 other alkaline basins reveal no evidence of underlying salt dissolution. Thus, whether the basins were initiated by subsidence over the salt dissolution areas or whether the salt dissolution was caused by infiltration of overlying lake water is conjectural. However, the fact that the lacustrine fill in Mound Lake greatly exceeds the amount of salt dissolution and subsidence of overlying beds indicates that at least Mound Lake basin was antecedent to the salt dissolution. The association of topography, structure, and dissolution in areas well removed from zones of shallow burial emphasizes the susceptibility of Permian salt-bed dissolution throughout the west Texas-eastern New Mexico area. Such evidence, combined with previous studies documenting salt-bed dissolution in areas surrounding a proposed high-level nuclear-waste repository site in Deaf Smith County, Texas, leads to serious questions about the rationale of using salt beds for nuclear-waste storage

  9. Highlights of the SSC Site Development Plan

    International Nuclear Information System (INIS)

    Sanford, J.R.

    1991-10-01

    This paper summarizes highlights of the Site Development Plan for the Superconducting Super Collider Laboratory. The Plan, sometimes called a Master Plan, was prepared by the architectural and engineering firm for the Laboratory: Parsons Brinckerhoff/Morrison Knudsen (PB/MK) working in association with CRSS. Their task was to interpret the SSC project needs in the context of the Ellis County, Texas site. The team effort was under the direction of Lewis May from CRSS, guided by Robert Sims from the SSC Laboratory. Conceptual drawings are presented in this report

  10. QA in the characterization of a low-level waste disposal site

    International Nuclear Information System (INIS)

    Jacobi, L.R. Jr.

    1989-01-01

    This paper discusses the implementation of the quality assurance program for the site characterization phase of the Texas low-level radioactive waste disposal facility. The author's thought on implementation of a program with a comparison to the California plan are presented

  11. Texstar: The all-Texas educational satellite system

    Science.gov (United States)

    1990-01-01

    Longhorn Satellite Company (LSC) has designed Texstar, and educational satellite communications system which will be considered as a means of equalizing the distribution of educational resources throughout the state of Texas. Texstar will be capable of broadcasting live lectures and documentaries in addition to transmitting data from a centralized receiving-transmitting station. Included in the design of Texstar is the system and subsystem design for the satellite and the design of the ground stations. The launch vehicle used will be the Texas-built Conestoga 421-48. The Texstar system incorporates three small satellites in slightly inclined geosynchronous orbits. Due to the configuration and spacing of these satellites, the system will be accessed as if it were one large, geostationary satellite. Texstar is shown to be a viable option to the educational crisis in the state of Texas.

  12. Effects of Year-Round Education on Texas Middle School Student Performance

    Science.gov (United States)

    Coopersmith, Michael

    2011-01-01

    This study was designed to investigate the effects of the year-round calendar on student performance in Texas middle schools as measured by achievement on the Texas Assessment of Knowledge and Skills (TAKS) test. In the State of Texas, 15 schools served students in grades six through eight using the year-round calendar in 2009-2010. The 15…

  13. 76 FR 7852 - Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort

    Science.gov (United States)

    2011-02-11

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort AGENCY: National Institute for Occupational Safety and Health... concerning the final effect of the HHS decision to designate a class of employees from Texas City Chemicals...

  14. Policy Brief: What is the Legal Framework for Automated Vehicles in Texas?

    Science.gov (United States)

    2017-11-01

    During the 85th Texas Legislature in 2017, Texas enacted a law related to automated vehicles. The bill, SB 2205, creates the legal framework for automated vehicle operation and testing in Texas. Although this law addresses a number of issues that can...

  15. National Uranium Resource Evaluation Program. Data report: Arkansas, Louisiana, Mississippi, Missouri, Oklahoma, and Texas. Hydrogeochemical and stream sediment reconnaissance

    International Nuclear Information System (INIS)

    Fay, W.M.; Sargent, K.A.; Cook, J.R.

    1982-02-01

    This report presents the results of ground water, stream water, and stream sediment reconnaissance in Arkansas, Louisiana, Mississippi, Missouri, Oklahoma, and Texas. The following samples were collected: Arkansas-3292 stream sediments, 5121 ground waters, 1711 stream waters; Louisiana-1017 stream sediments, 0 ground waters, 0 stream waters; Misissippi-0 stream sediments, 814 ground waters, 0 stream waters; Missouri-2162 stream sediments, 3423 ground waters 1340 stream waters; Oklahoma-2493 stream sediments, 2751 ground waters, 375 stream waters; and Texas-279 stream sediments, 0 ground waters, 0 stream waters. Neutron activation analyses are given for U, Br, Cl, F, Mn, Na, Al, V, and Dy in ground water and stream water, and for U, Th, Hf, Ce, Fe, Mn, Na, Sc, Ti, V, Al, Dy, Eu, La, Sm, Yb, and Lu in sediments. The results of mass spectroscopic analysis for He are given for 563 ground water sites in Mississippi. Field measurements and observations are reported for each site. Oak Ridge National Laboratory analyzed sediment samples which were not analyzed by Savannah River Laboratory neutron activation

  16. Preliminary site characterization - final report

    International Nuclear Information System (INIS)

    Clark, D.; Smith, L.B.

    1993-12-01

    This report summarizes the ecological unit reconnaissance conducted at the F-Area Burning/Rubble Pit(s) RCRA/CERCLA Unit (F-Area BRP) on August 30 and 31, 1993 as part of the RFI/RI baseline risk assessment for the waste unit The baseline risk assessment will assess the potential endangerment to human health and the environment associated with the unit and will be used to evaluate remediation criteria, if needed. The information presented in this report will be used in subsequent stages of the ecological risk assessment to refine the conceptual site model, assist in the selection of contaminants of concern, identify potential ecological receptors, and evaluate trophic relationships and other exposure pathways. The unit reconnaissance survey was conducted in accordance with Specification No. E-18272, Rev. 1 dated August 5, 1993, and the Draft open-quotes Ecological Risk Assessment Program Plan for Evaluation of Waste Sites on the Savannah River Siteclose quotes. The objectives of the site reconnaissance were to: Assess the general characteristics of on-unit biological communities including mammals, birds, reptiles, amphibians, and any aquatic communities present. Determine the location, extent, and characteristics of on-unit ecological resources, such as forested areas and wetlands, that could serve as important wildlife habitat or provide other ecological functions. Identify any overt effects of contamination on biological communities. The field investigations included mapping and describing all wetland and terrestrial habitats; recording wildlife observations of birds, mammals, and reptiles; and investigating ecological resources in nearby downgradient and downstream areas which could be affected by mobile contaminants or future remedial actions. In preparation for the field investigation, existing unit information including aerial photographs and reports were reviewed to help identify and describe ecological resources at the waste unit

  17. The procedure of alternative site selection within the report of the study group on the radioactive waste final repository selection process (AKEnd)

    International Nuclear Information System (INIS)

    Nies, A.

    2005-01-01

    The study group on the selection procedures of radioactive waste final repository sites has presented the report in December 2002. The author dicusses the consequences of this report with respect to the site selection focussing on two topics: the serach for the best possible site and the prevention of prejudices

  18. Marine Geology and Geophysics Field Course Offered by The University of Texas Institute for Geophysics

    Science.gov (United States)

    Duncan, D.; Davis, M. B.; Allison, M. A.; Gulick, S. P.; Goff, J. A.; Saustrup, S.

    2012-12-01

    The University of Texas Institute for Geophysics, part of the Jackson School of Geosciences, annually offers an intensive three-week marine geology and geophysics field course during the spring-summer intersession. Now in year six, the course provides hands-on instruction and training for graduate and upper-level undergraduate students in data acquisition, processing, interpretation, and visualization. Techniques covered include high-resolution seismic reflection, CHIRP sub-bottom profiling, multibeam bathymetry, sidescan sonar, several types of sediment coring, grab sampling, and the sedimentology of resulting seabed samples (e.g., core description, grain size analysis, x-radiography, etc.). Students participate in an initial period of classroom instruction designed to communicate geological context of the field area (which changes each year) along with theoretical and technical background on each field method. The class then travels to the Gulf Coast for a week of at-sea field work. Our field sites at Port Aransas and Galveston, Texas, and Grand Isle, Louisiana, have provided ideal locations for students to investigate coastal and sedimentary processes of the Gulf Coast and continental shelf through application of geophysical techniques. In the field, students rotate between two research vessels: one vessel, the 22' aluminum-hulled R/V Lake Itasca, owned and operated by UTIG, is used principally for multibeam bathymetry, sidescan sonar, and sediment sampling; the other, NOAA's R/V Manta or the R/V Acadiana, operated by the Louisiana Universities Marine Consortium, and is used primarily for high-resolution seismic reflection, CHIRP sub-bottom profiling, multibeam bathymetry, gravity coring, and vibrocoring. While at sea, students assist with survey design, learn instrumentation set up, acquisition parameters, data quality control, and safe instrument deployment and retrieval. In teams of three, students work in onshore field labs preparing sediment samples for

  19. Gastrointestinal helminths in raccoons in Texas.

    Science.gov (United States)

    Kresta, Amy E; Henke, Scott E; Pence, Danny B

    2009-01-01

    Raccoons (n=590) were collected from October 1999 to August 2003 from 35 counties across Texas, and gastrointestinal tracts were examined for helminth parasites. Prevalence was calculated and differences in mean abundance were examined among habitat ecoregions, age classes, and between sexes. Twenty different species of helminths (13 nematodes, two cestodes, two acanthocephalans, and three trematodes) were positively identified in the gastrointestinal tracts of 590 raccoons in Texas. Five of the 20 helminth species collected (Physaloptera rara, Placoconus lotoris, Molineus barbatus, Atriotaenia procyonis, and Macracanthorhynchus ingens) had a prevalence >20%. The total number of individuals of these five species (n=22,777) accounted for over 86% of the total number of individuals of all helminth species (n=26,426) collected. Subsequent analyses were based on these five helminths. Mean abundance differed among habitat ecoregions, age classes, and between sexes for all five parasites evaluated. This study is the most comprehensive statewide survey ever done of gastrointestinal helminths of raccoons across Texas. The five most prevalent helminths identified have all been reported in at least one previous survey, indicating that these parasites are not new to Texas and that raccoons are not naïve to the effects these parasites have on them. It may be helpful to wildlife rehabilitators, trappers, wildlife biologists, and other professionals to be aware of parasite abundance in raccoons from different areas of the state, as frequent human-raccoon interactions occur, and some of these parasites could be harmful to humans and domestic animals.

  20. NURE aerial gamma-ray and magnetic-reconnaissance survey portions of New Mexico, Arizona, and Texas. Volume I. Instrumentation and data reduction. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1981-09-01

    As part of the Department of Energy (DOE) National Uranium Resource Evaluation Program, a rotary-wing high sensitivity radiometric and magnetic survey was flown covering portions of the State of New Mexico, Arizona and Texas. The survey encompassed six 1:250,000 scale quadrangles, Holbrook, El Paso, Las Cruces, Carlsbad, Fort Sumner and Roswell. The survey was flown with a Sikorsky S58T helicopter equipped with a high sensitivity gamma ray spectrometer which was calibrated at the DOE calibration facilities at Walker Field in Grand Junction, Colorado, and the Dynamic Test Range at Lake Mead, Arizona. The radiometric data were processed to compensate for Compton scattering effects and altitude variations. The data were normalized to 400 feet terrain clearance. The reduced data is presented in the form of stacked profiles, standard deviation anomaly plots, histogram plots and microfiche listings. The results of the geologic interpretation of the radiometric data together with the profiles, anomaly maps and histograms are presented in the individual quadrangle reports. The survey was awarded to LKB Resources, Inc. which completed the data acquisition. In April, 1980 Carson Helicopters, Inc. and Carson Geoscience Company agreed to manage the project and complete delivery of this final report.

  1. NURE aerial gamma-ray and magnetic-reconnaissance survey portions of New Mexico, Arizona, and Texas. Volume I. Instrumentation and data reduction. Final report

    International Nuclear Information System (INIS)

    1981-09-01

    As part of the Department of Energy (DOE) National Uranium Resource Evaluation Program, a rotary-wing high sensitivity radiometric and magnetic survey was flown covering portions of the State of New Mexico, Arizona and Texas. The survey encompassed six 1:250,000 scale quadrangles, Holbrook, El Paso, Las Cruces, Carlsbad, Fort Sumner and Roswell. The survey was flown with a Sikorsky S58T helicopter equipped with a high sensitivity gamma ray spectrometer which was calibrated at the DOE calibration facilities at Walker Field in Grand Junction, Colorado, and the Dynamic Test Range at Lake Mead, Arizona. The radiometric data were processed to compensate for Compton scattering effects and altitude variations. The data were normalized to 400 feet terrain clearance. The reduced data is presented in the form of stacked profiles, standard deviation anomaly plots, histogram plots and microfiche listings. The results of the geologic interpretation of the radiometric data together with the profiles, anomaly maps and histograms are presented in the individual quadrangle reports. The survey was awarded to LKB Resources, Inc. which completed the data acquisition. In April, 1980 Carson Helicopters, Inc. and Carson Geoscience Company agreed to manage the project and complete delivery of this final report

  2. Hanford Site pollution prevention progress report; FINAL

    International Nuclear Information System (INIS)

    BETSCH, M.D.

    1999-01-01

    The Richland Operations Office (RL) and Office of River Protection (ORP) are pleased to issue the attached Pollution Prevention Progress Report. We have just met the most aggressive waste reduction and A recycling goals to date and are publishing this report to recognize A the site's progress, and to ensure it will sustain success beyond 1 Fiscal Year 2000. This report was designed to inform the been made by RL and ORP in Waste Minimization (WMin) and Pollution Prevention (P2). RL, ORP and their contractors are committed to protecting the environment, and we reiterate pollution prevention should continue to be at the forefront of the environmental cleanup and research efforts. As you read the attached report, we believe you will see a clear demonstration of RL and ORP's outstanding performance as it has been responsible and accountable to the nation, its employees, and the community in which we live and work. commitment that all employees have for environmental stewardship. The report provides useful information about the U.S. Department of Energy's (DOE'S) environmental policy and programs, and contains countless examples of waste minimization projects. This year was the first year our site received the White House Closing the Circle in the category of Affirmative Procurement. This Award recognizes our site for designing a comprehensive strategy for achieving 100 percent purchases of the U.S.Environmenta1 Protection Agency designated recycled items. DOE-Headquarters also acknowledged the site in 1999 for its public outreach efforts in communicating pollution prevention to Hanford Site employees and the community. Our site is truly a recognized leader in outreach as it has kept this title for two consecutive years. In previous years, we received the White House Closing the Circle Honorable Mention in Affirmative Procurement and several other National DOE Awards. Through partnership with the local community and stakeholders, the site and its contractors have a clear

  3. A review of efforts to restructure Texas' electricity market

    International Nuclear Information System (INIS)

    Zarnikau, Jay

    2005-01-01

    Comparisons suggest that Texas has been relatively successful in its efforts to introduce greater competition and customer choice into its unique electricity market (Center for Advancement of Electricity Markets, 2002). Yet, Texas has defied many of the common prescriptions in designing its market. Texas has yet to establish a nodal congestion management system that directly assigns local congestion costs to entities responsible for creating transmission congestion. A liquid power exchange or spot market is absent. Programs designed to encourage demand side responsiveness had a slow start. Market concentration remains high. Market oversight activities are poorly funded. A generation adequacy mechanism or planning reserve margin requirement remains under debate. Has Texas simply been lucky in averting any real disasters? Or are these market features less important than commonly recognized? This article reviews the restructuring initiative and reports some key lessons learned following the first twenty months under the new wholesale market structure and fifteen months of retail competition

  4. A review of efforts to restructure Texas' electricity market

    International Nuclear Information System (INIS)

    Zarnikau, J.

    2005-01-01

    Comparisons suggest that Texas has been relatively successful in its efforts to introduce greater competition and customer choice into its unique electricity market (Center for Advancement of Electricity Markets, 2002). Yet, Texas has defied many of the common prescriptions in designing its market. Texas has yet to establish a nodal congestion management system that directly assigns local congestion costs to entities responsible for creating transmission congestion. A liquid power exchange or spot market is absent. Programs designed to encourage demand side responsiveness had a slow start. Market concentration remains high. Market oversight activities are poorly funded. A generation adequacy mechanism or planning reserve margin requirement remains under debate. Has Texas simply been lucky in averting any real disasters? Or are these market features less important than commonly recognized? This article reviews the restructuring initiative and reports some key lessons learned following the first twenty months under the new wholesale market structure and fifteen months of retail competition. (author)

  5. Site Study Plan for land use, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Land Use Site Study Plan describes a field program consisting of characterization of the site; seismic survey rights-of-way and transportation and utility corridors, the vicinity, the region, future land use, and monitoring land-use change. Aerial photography will be used to characterize the site, seismic rows and transportation and utility corridors, and the vicinity. The resulting land-use maps and overlays will then be verified in the field. Interviews with farm managers and local experts will provide additional information. A Geographic Information System (GIS) and satellite imagery will be used to characterize the region, monitor land-use change, and provide information to assist with the future land use study. The site study plan describes the study design and rationale, the filed data collection procedures and equipment, the data analysis methods and application of results, the data management strategy, the schedule of field activities, the personnel requirements and management of the study, and the study's quality assurance program. The directives and requirements that drive these studies are derived from the Salt Repository Project Requirements Document. 51 refs; 6 figs; 3 tabs

  6. Supporting Ngss-Congruent Instruction in Earth & Space Science Through Educator Implementation and Feedback: Refining the Dig Texas Blueprints

    Science.gov (United States)

    Jacobs, B. E.; Bohls-Graham, C. E.; Ellins, K. K.; Riggs, E. M.; Serpa, L. F.; Stocks, E.; McIver, H.; Sergent, C.

    2015-12-01

    The development of the Next Generation Science Standards (NGSS) as a framework around which to guide K-12 science instruction has generated a call for rigorous curricula that meets the demand for developing a workforce with expertise in tackling modern Earth science challenges. The Diversity and Innovation in Geosciences (DIG) Texas Blueprints project addresses this need for quality, aligned curricula with educator-vetted, freely available resources carefully selected and compiled into three week thematic units that have been aligned with the Earth Science Literacy Principles and the NGSS. These units can then be packaged into customized blueprints for a year-long Earth & Space Science course that engages students in the relevant disciplinary core ideas, crosscutting concepts and science and engineering practices. As part of supporting NGSS-congruent instruction, each unit has extensive scaffolding notes for the learning activities selected for that unit. Designed with both the new and veteran teacher in mind, these scaffolding notes yield information regarding advanced teacher preparation, student prerequisite skills, and potential challenges that might arise during classroom implementation. Feedback from Texas high school teachers implementing the DIG Texas Blueprints in the classroom, in addition to that of university secondary education majors in a preparation course utilizing the blueprints, instigated the most recent revisions to these scaffolding notes. The DIG Texas Blueprints Educator Intern Team charged with these revisions then determined which learning activities became candidates for either inclusion in the refined units, retention as an additional resource, or elimination from the blueprints. This presentation will focus on the development of these scaffolding notes and their role in supporting congruence with the NGSS. A review of the second year of implementation of the blueprints and the feedback that generated the final revisions will be shared

  7. Surface-based test plan, Deaf Smith County, Texas Site: Draft

    International Nuclear Information System (INIS)

    1985-01-01

    The Surface-Based Test Plan (SBTP) is the plan which accounts for all surface-based site field work to be conducted at the Permian salt site selected for characterization. The SBTP relates data needs from program requirement documents and presents plans to satisfy the data needs. The SBTP excludes plans for construction of the Exploratory Shaft Facility (ESF) and plans for the in situ testing. The SBTP is a hierarchical plan stemming from the Technical Program Plan. The SBTP describes in detail the process by which surface-based study plans are defined, developed, and controlled. The plans hierarchy extends downward thru subordinate Site Study Plans (SSPs), which describe in detail elements of field work to be done, to detailed Procedures which document the exact methodologies to be employed in the conduct of field work. The plan is a QA level S document, although some of its elements are at lower QA levels. The plan is a controlled document, and any proposed amendments to the plan or subordinate documents can only be implemented through the specified change control procedure

  8. Final disposal of spent nuclear fuel-equipment for site characterization

    International Nuclear Information System (INIS)

    Almen, K.; Hansson, K.; Johansson, B.E.; Nilsson, G.; Andersson, O.; Wikberg, P.; Aahagen, H.

    1983-05-01

    The suitability of a certain geological formation as a repository for the final disposal of spent nuclear fuel can be determined only after detailed investigation and analysis. The purpose of the investigations is to provide information on the geology and the hydrology and chemistry of the site concerned. The value of these data largely depends on the way in which they have been collected. The report of the findings should enable the investigating party to evaluate the function and the accuracy of the equipment with which field data have been collected for KBS 3. This report describes the geophysical equipment, the hydraulic testing equipment, the water chemistry sample extracting equipment and the core-logging equipment used. The objectives of the instrument development have been: - to obtain a high data quality. - to collect data automatically in logs and tape recorders for direct transfer to a central processing unit. - to provide back-up in order to counteract loss of data. - to make instrument more efficient. (author)

  9. NCATE and Texas Eyeball to Eyeball: Who Will Blink?

    Science.gov (United States)

    Watts, Doyle

    1989-01-01

    The National Council for Accreditation of Teacher Education (NCATE) and Texas teacher training institutions are squaring off because of Texas SB 994, a law that eliminates undergraduate degrees in education and caps required credit hours in undergraduate teacher education courses. This article interviews Carl Parker, Hendrik Gideonse, Mary…

  10. TEXAS TAXES: A COMPARISON WITH OTHER STATES

    OpenAIRE

    Stallmann, Judith I.; Jones, Lonnie L.

    1998-01-01

    This document is part of an educational series on Texas taxes. State and local taxes in Texas are compared with those of the fifty states and the District of Columbia. Taxes are compared per capita and per $1,000 of personal income. The taxes include: all state and local taxes, property taxes, sales and gross receipts taxes, personal income taxes, corporate income taxes and corporate franchise taxes. For each tax the national average, median, maximum and minimum are given along with the corre...

  11. Isolation of avian influenza virus in Texas.

    Science.gov (United States)

    Glass, S E; Naqi, S A; Grumbles, L C

    1981-01-01

    An avian influenza virus with surface antigens similar to those of fowl plague virus (Hav 1 Nav 2) was isolated in 1979 from 2 commercial turkey flocks in Central Texas. Two flocks in contact with these infected flocks developed clinical signs, gross lesions, and seroconversion but yielded no virus. This was the first recorded incidence of clinical avian influenza in Texas turkeys and only the second time that an agent with these surface antigens was isolated from turkeys in U.S.

  12. Program and Abstracts, Boron Americas IX Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Feakes, Debra A.

    2006-08-09

    The Scientific and Technical Information (STI) submitted includes the final report and a collection of abstracts for the Ninth Boron in the Americas Conference which was held May 19-22, 2004, in San Marcos, Texas. The topics covered in the abstracts include: Application in Medicine, Application in Organic Synthesis and Catalysis, Boranes and Carboranes, Materials and Polymers, Metallaboranes and Metallacarboranes, Organoboron Compounds, Synthesis and Catalysis, and Theoretical Studies. Attendees represented researchers from government, industry, and academia.

  13. Use of Proton-Transfer-Reaction Mass Spectrometry to Characterize Volatile Organic Compound Sources at the La Porte Super Site During the Texas Air Quality Study 2000

    Energy Technology Data Exchange (ETDEWEB)

    Karl, Thomas G.; Jobson, B Tom T.; Kuster, W. C.; Williams, Eric; Stutz, Jochen P.; Shetter, Rick; Hall, Samual R.; Goldan, P. D.; Fehsenfeld, Fred C.; Lindinger, Werner

    2003-08-19

    Proton-transfer-reaction mass spectrometry (PTR-MS) was deployed for continuous real-time monitoring of volatile organic compounds (VOCs) at a site near the Houston Ship Channel during the Texas Air Quality Study 2000. Overall, 28 ions dominated the PTR-MS mass spectra and were assigned as anthropogenic aromatics (e.g., benzene, toluene, xylenes) and hydrocarbons (propene, isoprene), oxygenated compounds (e.g., formaldehyde, acetaldehyde, acetone, methanol, C7 carbonyls), and three nitrogencontaining compounds (e.g., HCN, acetonitrile and acrylonitrile). Biogenic VOCs were minor components at this site. Propene was the most abundant lightweight hydrocarbon detected by this technique with concentrations up to 100+ nmol mol-1, and was highly correlated with its oxidation products, formaldehyde (up to ~40 nmol mol-1) and acetaldehyde (up to ~80 nmol/mol), with typical ratios close to 1 in propene-dominated plumes. In the case of aromatic species the high time resolution of the obtained data set helped in identifying different anthropogenic sources (e.g., industrial from urban emissions) and testing current emission inventories. A comparison with results from complimentary techniques (gas chromatography, differential optical absorption spectroscopy) was used to assess the selectivity of this on-line technique in a complex urban and industrial VOC matrix and give an interpretation of mass scans obtained by ‘‘soft’’ chemical ionization using proton-transfer via H3O+. The method was especially valuable in monitoring rapidly changing VOC plumes which passed over the site, and when coupled with meteorological data it was possible to identify likely sources.

  14. Comal County, Texas: Preparing for Life after High School

    Science.gov (United States)

    Walter, Frank

    2018-01-01

    Comal County, Texas, may be rural but its students face many of the same challenges as students in urban districts. Communities In Schools of South Central Texas works with the local school district to identify student needs and provide critical supports to help young people prepare for life after high school.

  15. Ecological investigations at the Pantex Plant Site, 1992

    International Nuclear Information System (INIS)

    Cushing, C.E.; Mazaika, R.R.; Phillips, R.C.

    1993-09-01

    In 1992, Pantex requested that Pacific Northwest Laboratory (PNL) conduct a series of ecological surveys to provide baseline information for designing detailed ecological studies on the various ecosystems present at the Pantex plant site near Amarillo, Texas. To this end, PNL scientist and technicians visited the site at different times to conduct investigations and collect samples: July 6--13: birds, small mammals, general habitat assessment; August 10--14: wetland vegetation, birds, small mammals, Playa invertebrates; and September 7--11: birds, small mammals. This report presents the results of these three surveys

  16. Evaluation of the Catahoula Formation as a source rock for uranium mineralization, with emphasis on East Texas

    International Nuclear Information System (INIS)

    Ledger, E.B. Jr.

    1981-01-01

    The Oligocene/Miocene Catahoula Formation of the Texas coastal plain is a fluvial and lacustrine volcaniclastic unit composed of normal fluvial material mixed with distal rhyolitic air-fall ash and, in the lower coastal plain, also stream-transported erosion detritus from the volcanic source area in Trans-Pecos Texas and adjacent northern Mexico, the nearest source of appropriate age and chemical affinity. Pedogenic and shallow-burial alteration of the labile volcanic glass component of the sediment resulted in ubiquitous secondary montmorillonite and solubilization of elements which are mobile in a HCO 3 -rich, near-surface environment. Primary uranium present in the glass at 5 to 6 ppMU was similarly mobilized and, under favorable conditions, accumulated by precipitation of tetravalent uranium phases at sites of lower Eh. Known economic deposits are restricted to the lower coastal plain where there has been uranium production for more than twenty years. Although there are differences between the productive lower coastal plain and the middle and upper as to stratigraphy, mineralogical composition, and weathering history, labile volcaniclastic material and its alteration products are abundant throughout the Catahoula outcrop and shallow subsurface in Texas. To provide a geochemical basis of comparison, samples from the upper, middle, and lower Texas coastal plain and the Trans-Pecos source area were analyzed for uranium, thorium, potassium, rubidium, strontium, zirconium, and titanium. These include both labile and immobile elements. Typical levels of these elements in the source material and relatively unaltered Catahoula volcanic glass allows estimation of uranium loss from highly altered sections based on their immobile element content

  17. Streamflow gains and losses and selected water-quality observations in five subreaches of the Rio Grande/Rio Bravo del Norte from near Presidio to Langtry, Texas, Big Bend area, United States and Mexico, 2006

    Science.gov (United States)

    Raines, Timothy H.; Turco, Michael J.; Connor, Patrick J.; Bennett, Jeffery B.

    2012-01-01

    Few historical streamflow and water-quality data are available to characterize the segment of the Rio Grande/Rio Bravo del Norte (hereinafter Rio Grande) extending from near Presidio to near Langtry, Texas. The U.S. Geological Survey, in cooperation with the National Park Service and the Texas Commission on Environmental Quality, collected water-quality and streamflow data from the Rio Grande from near Presidio to near Langtry, Texas, to characterize the streamflow gain and loss and selected constituent concentrations in a 336.3-mile reach of the Rio Grande from near Presidio to near Langtry, Texas. Streamflow was measured at 38 sites and water-quality samples were collected at 20 sites along the Rio Grande in February, March, and June 2006. Streamflow gains and losses over the course of the stream were measured indirectly by computing the differences in measured streamflow between sites along the stream. Water-quality data were collected and analyzed for salinity, dissolved solids, major ions, nutrients, trace elements, and stable isotopes. Selected properties and constituents were compared to available Texas Commission on Environmental Quality general use protection criteria or screening levels. Summary statistics of selected water-quality data were computed for each of the five designated subreaches. Streamflow gain and loss and water-quality constituent concentration were compared for each subreach, rather than the entire segment because of the temporal variation in sample collection caused by controlled releases upstream. Subreach A was determined to be a losing reach, and subreaches B, C, D, and E were determined to be gaining reaches. Compared to concentrations measured in upstream subreaches, downstream subreaches exhibited evidence of dilution of selected constituent concentrations. Subreaches A and B had measured total dissolved solids, chloride, and sulfate exceeding the Texas Commission on Environmental Quality general use protection criteria

  18. Commercial truck platooning demonstration in Texas – level 2 automation.

    Science.gov (United States)

    2017-08-01

    Through this project, the Texas Department of Transportation (TxDOT) funded the creation of a comprehensive truck platooning demonstration in Texas, serving as a proactive effort in assessing innovative operational strategies to position TxDOT as a l...

  19. Use of Loran-C navigation system to accurately determine sampling site location in an above ground cooling reservoir

    International Nuclear Information System (INIS)

    Lockwood, R.E.; Blankinship, D.R.

    1994-01-01

    Environmental monitoring programs often require accurate determination of sampling site locations in aquatic environments. This is especially true when a open-quotes pictureclose quotes of high resolution is needed for observing a changing variable in a given area and location is assumed to be important to the distribution of that variable. Sample site location can be difficult if few visible land marks are available for reference on a large body of water. The use of navigational systems such as Global Positioning System (GPS) and its predecessor, Loran-C, provide an excellent method for sample site location. McFarland (1992) discusses the practicality of GPS for location determination. This article discusses the use of Loran-C in a sampling scheme implemented at the South Texas Project Electrical Generating Station (STPEGS), Wadsworth, Texas

  20. Site-specific design of the super collider in Texas

    International Nuclear Information System (INIS)

    Laughton, C.; Nelson, P.P.; Lundin, T.K.

    1990-06-01

    This paper will outline the scope of the Superconducting Super Collider (SSC), underground works and present the current accelerator layout. After a brief overview of the site geotechnical characteristics, emphasis will be placed upon the possibilities for the incorporation of mechanical excavation technology into the construction of the various underground structures. 5 figs

  1. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    International Nuclear Information System (INIS)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites

  2. The economic efficiency of allowing longer combination vehicles in Texas.

    Science.gov (United States)

    2011-08-01

    This paper shows the economic efficiency of allowing longer combination vehicles in Texas. First, an : overview of the truck size and weight policies is explained, with an emphasis on those that affect : Texas. Next, LCV operations in other countries...

  3. Delivery of workshops on corridor management and preservation in Texas.

    Science.gov (United States)

    2010-12-01

    This report summarizes the delivery and outcome of a series of workshops conducted at 23 Texas : Department of Transportation (TxDOT) districts across the state on corridor management and preservation : in Texas. The workshops served as follow-up imp...

  4. 76 FR 16447 - ETHICON, a Subsidiary of Johnson & Johnson Including On-Site Leased Workers From Kelly Temporary...

    Science.gov (United States)

    2011-03-23

    ... workers of ETHICON, A Johnson and Johnson Company, San Angelo, Texas, separated from employment on or... Johnson & Johnson Including On-Site Leased Workers From Kelly Temporary Services, San Angelo, TX; Amended... of ETHICON, a subsidiary of Johnson & Johnson, including on-site leased workers from Kelly Temporary...

  5. Geologic framework and hydrogeologic features of the Glen Rose Limestone, Camp Bullis Training Site, Bexar County, Texas

    Science.gov (United States)

    Clark, Allan K.

    2003-01-01

    The Glen Rose Limestone crops out over most of the Camp Bullis Training Site in northern Bexar County, Texas, where it consists of upper and lower members and composes the upper zone and the upper part of the middle zone of the Trinity aquifer. Uncharacteristically permeable in northern Bexar County, the Glen Rose Limestone can provide avenues for recharge to and potential contamination of the downgradient Edwards aquifer, which occupies the southeastern corner of Camp Bullis.The upper member of the Glen Rose Limestone characteristically is thin-bedded and composed mostly of soft limestone and marl, and the lower Glen Rose typically is composed mostly of relatively massive, fossiliferous limestone. The upper member, about 410 to 450 feet thick at Camp Bullis, was divided in this study into five hydrogeologic subdivisions, A through E (youngest to oldest).The approximately 120-foot-thick Interval A has an abundance of caves, which is indicative of its generally well developed fracture, channel, and cavern porosity that in places provides appreciable permeability. The 120- to 150-foot-thick Interval B is similar to Interval A but with less cave development and considerably less permeability. The 10- to 20-foot-thick Interval C, a layer of partly to mostly dissolved soluble carbonate minerals, is characterized by breccia porosity, boxwork permeability, and collapse structures that typically divert ground water laterally to discharge at land surface. The 135- to 180-foot-thick Interval D generally has low porosity and little permeability with some local exceptions, most notably the caprinid biostrome just below the top of the interval, which appears to be permeable by virtue of excellent moldic, vug, fracture, and cavern porosity. The 10- to 20-foot-thick Interval E, a layer of partly to mostly dissolved evaporites similar to Interval C, has similar hydrogeologic properties and a tendency to divert ground water laterally.

  6. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    International Nuclear Information System (INIS)

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC)

  7. Geology and geohydrology of the Palo Duro Basin, Texas Panhandle. Report on the progress of nuclear waste isolation feasibility studies, 1978

    International Nuclear Information System (INIS)

    Dutton, S.P.; Finley, R.J.; Galloway, W.E.; Gustavson, T.C.; Handford, C.R.; Presley, M.W.

    1979-01-01

    Early in 1977 the Bureau of Economic Geology was invited to assemble and evaluate geologic data on several salt-bearing basins within the State of Texas as a contribution to the national nuclear repository program. In response to this request, the Bureau, acting as a technical research unit of the University of Texas at Austin and the State of Texas, initiated a long-term program to assemble and interpret all geologic and hydrologic information necessary for delineation, description, and evaluation of salt-bearing strata in the Panhandle area. The technical program can be subdivided into three broad research tasks, which are addressed by a basin analysis group, a surface studies group, and a basin geohydrology group. The basin analysis group has assembled the regional stratigraphic and structural framework of the total basin fill, initiated evaluation of natural resources, and selected stratigraphic core sites for sampling the salt and associated beds. Two drilling sites have provided nearly 8000 feet (2400 m) of core material for analysis and testing of the various lithologies overlying and interbedded with salt units. Concurrently, the surface studies group has collected ground and remotely-sensed data to describe surficial processes, including carbonate and evaporate solution, geomorphic evolution, and fracture system development. The newly formed basin geohydrology group will evaluate both shallow and deep circulation of fluids within the basins. This paper, a summary report of progress, reviews principal conclusions and illustrates the methodologies used and the types of data and displays generated

  8. Shaft siting decision report: Final report

    International Nuclear Information System (INIS)

    1985-11-01

    The purpose of this study is to identify and establish relative guidelines to be used for siting of repository shafts. Weights were determined for the significant factors which impact the selection of shaft locations for a nuclear waste repository in salt. The study identified a total of 45 factors. A panel of experienced mining people utilized the Kepner-Tregoe (K-T) Decision Analysis Process to perform a structured evaluation of each significant shaft siting factor. The evaluation determined that 22 of the factors were absolute constraints and that the other 23 factors were desirable characteristics. The group established the relative weights for each of the 23 desirable characteristics by using a paired comparison method. 49 refs., 2 figs., 5 tabs

  9. Tracking the Career Paths of Physics Teachers in Texas

    Science.gov (United States)

    Mount, Jennifer; Marshall, Jill; Fuller, Edward

    2013-10-01

    In Texas, and some other states, there is a documented shortage of physics teachers, in terms of both number and qualifications. The shortage in Texas is due as much to teachers leaving the field (attrition) as to a lack of teachers entering. There are efforts under way to prepare more and better-qualified physics teachers who will stay in the field longer,2 but increasing the overall supply and retention will not necessarily address localized teacher shortages. To investigate this issue, we obtained a database cataloging every teacher who taught science in Texas public schools from 2003 to 2008, indicating the school where they taught during each of those years, the subjects they taught, and their route to certification. This allowed us to track not only teachers entering and leaving the public school system, but also migration between schools within the system. We found that migration poses a much bigger problem than attrition for some schools. We also found patterns in the movement of physics teachers in Texas that we would not necessarily have predicted and that varied substantially depending on certification.

  10. A Project to Develop a Marketing Plan in Support of William Beaumont Army Medical Center, Fort Bliss, Texas

    Science.gov (United States)

    1989-12-01

    stressed by the Texas Hospital Association (1982), "the key to success in applying and understanding the marketing mix lies in the concept of rightness...alternatives 8. Develop the marketing mix 9. Select a strategy option Phase III (Finalization)’ 10. Design the tactics 11. Present the plan 12. Write the plan...usage incentive Marketing mix Product, price, distribution [place], marketing communication [promotion] Contingency strategies Marketing Budget (How Much

  11. Occurrence of vesicular-arbuscular mycorrhizae in mixed overburden mine spoils of Texas

    Energy Technology Data Exchange (ETDEWEB)

    Mott, J.B.; Zuberer, D.A.

    1987-07-01

    Presently in east Texas, lignite surface mines are reclaimed and revegetated using mixed overburden materials which are equivalent to or better in physical-chemical properties than the poor topsoils removed during mining. Little information is available regarding the biological characteristics of levelled mixed overburden and the re-establishment of endomycorrhizal associations on revegetated mixed overburden sites. Therefore, the authors investigated the occurrence of infection of coastal bermudagrass (Cynodon dactylon), planted vegetatively on reclamation sites (1-10 years post-mining), with vesicular-arbuscular mycorrhizal (VAM) fungi. Numbers of spores were also monitored. For comparison, infection of coastal bermudagrass and spore numbers were determined for an unmined old field succession on soil typical of the region. VAM infection, measured as a percentage of root length infected or as a percentage of root segments exhibiting infection, returned to pre-mining levels by 3-7 years after disturbance. Intensity of infection was not altered by disturbance, age of reclaimed site, or season. Significantly greater numbers of spores (ca. 10-fold) were observed in the unmined soil and no differences were found between numbers of spores from variously aged mine spoil sites. 35 refs., 3 tabs.

  12. SKI's and SSI's experiences from their participation in the siting of a final repository for spent nuclear fuel

    International Nuclear Information System (INIS)

    Westerlind, M.; Hedberg, B.

    2000-01-01

    This paper summarises some experiences gained by the SKI and SSI during the ongoing process for siting a final repository for spent nuclear fuel. The focus is on activities in the municipalities involved in the siting process. In order to give the proper context some basic elements in the legislation, which are important for public participation and confidence in the siting process, are outlined. The importance of clearly defined responsibilities and early participation of the regulators in the siting process are emphasised. It should be pointed out that this paper is not a comprehensive review of the Swedish situation but only contains a few selected issues and personal remarks from the authors. Thus, the views and opinions do not necessarily coincide with those of SKI and SSI. (authors)

  13. Texas State Briefing Book for low-level radioactive waste management

    Energy Technology Data Exchange (ETDEWEB)

    1981-08-01

    The Texas State Briefing Book is one of a series of state briefing books on low-level radioactivee waste management practices. It has been prepared to assist state and federal agency officials in planning for safe low-level radioactive waste disposal. The report contains a profile of low-level radioactive waste generators in Texas. The profile is the result of a survey of NRC licensees in Texas. The briefing book also contains a comprehensive assessment of low-level radioactive waste management issues and concerns as defined by all major interested parties including industry, government, the media, and interest groups. The assessment was developed through personal communications with representatives of interested parties, and through a review of media sources. Lastly, the briefing book provides demographic and socioeconomic data and a discussion of relevant government agencies and activities, all of which may impact waste management practices in Texas.

  14. Texas State Briefing Book for low-level radioactive waste management

    International Nuclear Information System (INIS)

    1981-08-01

    The Texas State Briefing Book is one of a series of state briefing books on low-level radioactivee waste management practices. It has been prepared to assist state and federal agency officials in planning for safe low-level radioactive waste disposal. The report contains a profile of low-level radioactive waste generators in Texas. The profile is the result of a survey of NRC licensees in Texas. The briefing book also contains a comprehensive assessment of low-level radioactive waste management issues and concerns as defined by all major interested parties including industry, government, the media, and interest groups. The assessment was developed through personal communications with representatives of interested parties, and through a review of media sources. Lastly, the briefing book provides demographic and socioeconomic data and a discussion of relevant government agencies and activities, all of which may impact waste management practices in Texas

  15. Environmental Assessment: Geothermal Energy Geopressure Subprogram. Gulf Coast Well Testing Activity, Frio Formation, Texas and Louisiana

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-02-01

    This Environmental Assessment (EA) has been prepared to provide the environmental input into the Division of Geothermal Energy's decisions to expand the geothermal well testing activities to include sites in the Frio Formation of Texas and Louisiana. It is proposed that drilling rigs be leased before they are removed from sites in the formation where drilling for gas or oil exploration has been unsuccessful and that the rigs be used to complete the drilling into the geopressured zone for resource exploration. This EA addresses, on a regional basis, the expected activities, affected environment, and the possible impacts in a broad sense as they apply to the Gulf Coast well testing activity of the Geothermal Energy Geopressure Subprogram of the Department of Energy. Along the Texas and Louisiana Gulf Coast (Plate 1 and Overlay, Atlas) water at high temperatures and high pressures is trapped within Gulf basin sediments. The water is confined within or below essentially impermeable shale sequences and carries most or all of the overburden pressure. Such zones are referred to as geopressured strata. These fluids and sediments are heated to abnormally high temperatures (up to 260 C) and may provide potential reservoirs for economical production of geothermal energy. The obvious need in resource development is to assess the resource. Ongoing studies to define large-sand-volume reservoirs will ultimately define optimum sites for drilling special large diameter wells to perform large volume flow production tests. in the interim, existing well tests need to be made to help define and assess the resource.

  16. 75 FR 19645 - Enterprise Texas Pipeline LLC; Notice of Petition for Rate Approval

    Science.gov (United States)

    2010-04-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-14-000] Enterprise..., 2010, Enterprise Texas Pipeline LLC (Enterprise Texas) filed a petition for rate approval pursuant to section 284.123(b)(2) of the Commission's regulations. Enterprise Texas proposes rates of $0.6090 per...

  17. Analysis of KROTOS KS-2 and KS-4 steam explosion experiments with TEXAS-VI

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Ronghua, E-mail: rhchen@mail.xjtu.edu.cn [State Key Laboratory of Multiphase Flow in Power Engineering, School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an 710049 (China); Wang, Jun [Nuclear Engineering and Engineering Physics, College of Engineering, University of Wisconsin Madison, WI 53706 (United States); Su, G.H.; Qiu, Suizheng [State Key Laboratory of Multiphase Flow in Power Engineering, School of Nuclear Science and Technology, Xi’an Jiaotong University, Xi’an 710049 (China); Corradini, M.L., E-mail: Corradini@engr.wisc.edu [Nuclear Engineering and Engineering Physics, College of Engineering, University of Wisconsin Madison, WI 53706 (United States)

    2016-12-01

    Highlights: • The KS-2 and KS-4 steam explosion experiments were analyzed by TEXAS-VI. • The coarse mixing status up to the explosion triggering time was well predicted by TEXAS-VI. • The predicted dynamic explosion pressure was in good agreement with the experimental results. - Abstract: TEXAS-VI is a transient, three-field, one-dimensional mechanistic model for the steam explosion phenomena. A fuel solidification model and associated fragmentation criteria of the solidifying particle for both the mixing phase and explosion phase were developed and incorporated into TEXAS-VI to account for solidification. In the present study, TEXAS-VI was used to analyze the KS-2 and KS-4 steam explosion experiments, which were performed in the KROTOS facility as part of the OECD-SERENA-2 program. In the simulation, the KROTOS experimental facility was modeled as Eulerian control volumes based on the facility geometry. The molten corium jet was divided up into a series of LaGrangian master particles equal to the initial jet diameter. Both the mixing phase and the explosion phase of the experiments were simulated by TEXAS-VI. Comparison to test data indicates that the fuel jet kinematics and the vapor volume during the mixing phase were well predicted by TEXAS-VI. The TEXAS-VI prediction of the dynamic explosion pressure at different axial locations in the test was also in good agreement with the experimental results. The maximum pressure of KS-2 and KS-4 predicted by TEXAS-VI were 16.7 MPa and 41.9 MPa, respectively. The KS-4 maximum steam explosion pressure predicted by TEXAS-VI was higher than that of KS-2, which was consistent with experiment observation. The observed differences of the dynamic explosion pressure between the KS-2 and KS-4 experiments were also successfully simulated by TEXAS-VI. This suggests that TEXAS-VI is able to analyze the effect of prototypic melt compositions on the steam explosion phenomena. Additional benchmarking and evaluations are ongoing.

  18. CSHCN in Texas: meeting the need for specialist care.

    Science.gov (United States)

    Young, M Cherilyn; Drayton, Vonna L C; Menon, Ramdas; Walker, Lesa R; Parker, Colleen M; Cooper, Sam B; Bultman, Linda L

    2005-06-01

    Assuring the sufficiency and suitability of systems of care and services for children with special health care needs (CSHCN) presents a challenge to Texas providers, agencies, and state Title V programs. To meet the need for specialist care, referrals from primary care doctors are often necessary. The objective of this study was to describe the factors associated with the need for specialist care and problems associated with obtaining referrals in Texas. Bivariate and multivariate analyses were performed using the National Survey of Children with Special Health Care Needs (NS-CSHCN) weighted sample for Texas (n = 719,014) to identify variables associated with the need for specialist care and problems obtaining referrals for specialist care. Medical need of the CSHCN and sensitivity to family values/customs was associated with greater need for specialist care, and Hispanic ethnicity and lower maternal education were associated with less need. Medical need, amount of time spent with doctors and sensitivity to values/customs, living in a large metropolitan statistical area, and lack of medical information were associated with problems obtaining a specialist care referral. Findings revealed some similarities and differences with meeting the need for specialist care when comparing Texas results to other studies. In Texas, aspects of customer satisfaction variables, especially doctors' sensitivity to family values/customs and parents' not receiving enough information on medical problems, were significantly associated with problems obtaining specialist referrals. Findings indicate a need to further research relationships and communication among doctors, CSHCN, and their families.

  19. Mercury Control for Plants Firing Texas Lignite and Equipped with ESP-wet FGD

    Energy Technology Data Exchange (ETDEWEB)

    Katherine Dombrowski

    2009-12-31

    This report presents the results of a multi-year test program conducted as part of Cooperative Agreement DE-FC26-06NT42779, 'Mercury Control for Plants Firing Texas Lignite and Equipped with ESP-wet FGD.' The objective of this program was to determine the level of mercury removal achievable using sorbent injection for a plant firing Texas lignite fuel and equipped with an ESP and wet FGD. The project was primarily funded by the U.S. DOE National Energy Technology Laboratory. EPRI, NRG Texas, Luminant (formerly TXU), and AEP were project co-funders. URS Group was the prime contractor, and Apogee Scientific and ADA-ES were subcontractors. The host site for this program was NRG Texas Limestone Electric Generating Station (LMS) Units 1 and 2, located in Jewett, Texas. The plant fires a blend of Texas lignite and Powder River Basin (PRB) coal. Full-scale tests were conducted to evaluate the mercury removal performance of powdered sorbents injected into the flue gas upstream of the ESP (traditional configuration), upstream of the air preheater, and/or between electric fields within the ESP (Toxecon{trademark} II configuration). Phases I through III of the test program, conducted on Unit 1 in 2006-2007, consisted of three short-term parametric test phases followed by a 60-day continuous operation test. Selected mercury sorbents were injected to treat one quarter of the flue gas (e.g., approximately 225 MW equivalence) produced by Limestone Unit 1. Six sorbents and three injection configurations were evaluated and results were used to select the best combination of sorbent (Norit Americas DARCO Hg-LH at 2 lb/Macf) and injection location (upstream of the ESP) for a two-month performance evaluation. A mercury removal rate of 50-70% was targeted for the long-term test. During this continuous-injection test, mercury removal performance and variability were evaluated as the plant operated under normal conditions. Additional evaluations were made to determine any

  20. Effects of a Tobacco-Free Work Site Policy on Employee Tobacco Attitudes and Behaviors, Travis County, Texas, 2010-2012.

    Science.gov (United States)

    Seidel, Sarah E; Metzger, Kristi; Guerra, Andrea; Patton-Levine, Jessie; Singh, Sandeepkumar; Wilson, William T; Huang, Philip

    2017-12-14

    The adoption of tobacco-free policies in behavioral health settings is an important step in reducing staff tobacco use as well as the high rates of tobacco use among people with mental illness and behavioral disorders. Studies have demonstrated the importance of staff support when implementing tobacco-free workplace policies, but there is limited research examining tobacco use prevalence among staff and staff attitude before and after policy adoption. Integral Care, a local authority for behavioral health and developmental disabilities in Austin, Texas, and Austin Public Health embarked on a comprehensive planning process before implementing a 100% tobacco-free campus policy. The objectives were 1) assess staff tobacco use and attitudes toward a tobacco-free policy, 2) communicate policy to staff, 3) provide staff education and training, and 4) provide cessation resources. Integral Care and Austin Public Health conducted a web-based employee survey 6 months before and 6 and 12 months after implementation of the policy to measure tobacco use prevalence and attitudes among employees. Employees had significant improvements in tobacco use prevalence and attitudes toward the tobacco-free policy from pre-implementation to post-implementation. Tobacco use prevalence among staff decreased from 27.6% to 13.8%, and support for the policy increased from 60.6% to 80.3% at 12 months post-implementation. Adoption of 100% tobacco-free campus policies in behavioral health settings can result in significant reductions in staff tobacco use. Leadership should provide staff with education, training, and cessation support before adoption of tobacco-free work site policies to ensure success.

  1. The Prevalence of Trypanosoma cruzi, the Causal Agent of Chagas Disease, in Texas Rodent Populations.

    Science.gov (United States)

    Aleman, Adriana; Guerra, Trina; Maikis, Troy J; Milholland, Matthew T; Castro-Arellano, Ivan; Forstner, Michael R J; Hahn, Dittmar

    2017-03-01

    Rodent species were assessed as potential hosts of Trypanosoma cruzi, the etiologic agent of Chagas disease, from five sites throughout Texas in sylvan and disturbed habitats. A total of 592 rodents were captured, resulting in a wide taxonomic representation of 11 genera and 15 species. Heart samples of 543 individuals were successfully analyzed by SybrGreen-based quantitative PCR (qPCR) targeting a 166 bp fragment of satellite DNA of T. cruzi. Eight rodents representing six species from six genera and two families were infected with T. cruzi. This is the first report of T. cruzi in the pygmy mouse (Baiomys taylori) and the white-footed mouse (Peromyscus leucopus) for the USA. All infected rodents were from the southernmost site (Las Palomas Wildlife Management Area). No differences in pathogen prevalence existed between disturbed habitats (5 of 131 tested; 3.8%) and sylvan habitats (3 of 40 tested; 7.5%). Most positives (n = 6, 16% prevalence) were detected in late winter with single positives in both spring (3% prevalence) and fall (1% prevalence). Additionally, 30 Triatoma insects were collected opportunistically from sites in central Texas. Fifty percent of these insects, i.e., 13 T. gerstaeckeri (68%), and two T. lecticularia (100%) were positive for T. cruzi. Comparative sequence analyses of 18S rRNA of samples provided identical results with respect to detection of the presence or absence of T. cruzi and assigned T. cruzi from rodents collected in late winter to lineage TcI. T. cruzi from Triatoma sp. and rodents from subsequent collections in spring and fall were different, however, and could not be assigned to other lineages with certainty.

  2. Stable Isotopic Composition of Precipitation from 2015-2016 Central Texas Rainfall Events

    Science.gov (United States)

    Maupin, C. R.; McChesney, C. L.; Roark, B.; Gorman, M. K.; Housson, A. L.

    2016-12-01

    Central Texas lies within the Southern Great Plains, a region where rainfall is of tremendous agricultural and associated socioeconomic importance. Paleoclimate records from speleothems in central Texas caves may assist in placing historical and recent drought and pluvial events in the context of natural variability. Effective interpretation of such records requires the nature and origin of variations in the meteoric δ18O signal transmitted from cloud to speleothem to be understood. Here we present a record of meteoric δ18O and δD from each individual precipitation event (δ18Op and δDp), collected by rain gauge in Austin, Texas, USA, from April 2015 through 2016. Backwards hybrid single-particle Lagrangian integrated trajectories (HYSPLITs) indicate the broader moisture source for each precipitation event during this time was the Gulf of Mexico. The local meteoric water line is within error of the global meteoric water line, suggesting minimal sourcing of evaporated continental vapor for precipitation. Total monthly rainfall followed the climatological pattern of a dual boreal spring and fall maximum, with highly variable event δ18Op and δDp values. Surface temperature during precipitation often exerts control over continental and mid latitude δ18Op values, but is not significantly correlated to study site δ18Op (p>0.10). Amount of rain falling during each precipitation event ("amount effect") explains a significant 18% of variance in δ18Op. We hypothesize that this relationship can be attributed to the following: 1) minimal recycling of continental water vapor during the study period; 2) the presence of synoptic conditions favoring intense boreal spring and fall precipitation, driven by a developing, and subsequently in-place, strong ENSO event coupled with a southerly flow from the open Gulf of Mexico; and 3) the meteorological nature of the predominant precipitating events over Texas during this time, mesoscale convective systems, which are known to

  3. 77 FR 58025 - Texas Regulatory Program

    Science.gov (United States)

    2012-09-19

    ... appropriation. When calculating anticipated costs to the Commission for regulating coal mining activity, Texas... (c) Does not have significant adverse effects on competition, employment, investment, productivity...

  4. High-level wastes: DOE names three sites for characterization

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    DOE announced in May 1986 that there will be there site characterization studies made to determine suitability for a high-level radioactive waste repository. The studies will include several test drillings to the proposed disposal depths. Yucca Mountain, Nevada; Deaf Smith Country, Texas, and Hanford, Washington were identified as the study sites, and further studies for a second repository site in the East were postponed. The affected states all filed suits in federal circuit courts because they were given no advance warning of the announcement of their selection or the decision to suspend work on a second repository. Criticisms of the selection process include the narrowing or DOE options

  5. Decision-Making Processes in Texas School Districts That Arm Personnel

    Science.gov (United States)

    Domain, Melinda Willoughby

    2014-01-01

    This qualitative phenomenological study employed narrative inquiry to describe the decision-making processes that Texas school districts followed in enacting firearms policies that allow school employees to carry concealed weapons on district property. Exploration of the lived experiences of eight Texas superintendents in such schools contributed…

  6. Residential Energy Efficiency Potential: Texas

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, Eric J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-11-02

    Energy used by Texas single-family homes that can be saved through cost-effective improvements. Prepared by Eric Wilson and Noel Merket, NREL, and Erin Boyd, U.S. Department of Energy Office of Energy Policy and Systems Analysis.

  7. Qualifying cogeneration in Texas and Louisiana

    International Nuclear Information System (INIS)

    Jenkins, S.C.; Cabe, R.; Stauffaeher, J.J.

    1992-01-01

    This paper reports that cogeneration of electricity and useful thermal energy by industrials along the Gulf Coast grew significantly more rapidly than in other parts of the country during and immediately following World War II as a result of the concentration of chemical and plastics processing facilities there. In 1982, Texas passed its version of PURPA, the Public Utility Regulatory Act (PURA) and designated those non-utility generators from which public utilities must purchase electricity as Qualifying Cogenerators. In 1991, there were nearly 7,500 MW of QF power generated for inside-the-fence use or firm capacity sale to utilities, with the two largest utilities in Texas purchasing over half that amount

  8. Site 300 Bat Monitoring Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Drennan, Joe [Garcia and Associates, San Francisco, CA (United States); Tortosa, Justin [Garcia and Associates, San Francisco, CA (United States)

    2016-07-18

    From June 15 to 18, 2015, GANDA biologist Graham Neale assisted in programming and fieldtesting of the bat monitoring equipment. The equipment was deployed in the field on a meteorological (MET) tower within Site 300 on June 18, 2015.

  9. Tracking the Career Paths of Physics Teachers in Texas

    Science.gov (United States)

    Mount, Jennifer; Marshall, Jill; Fuller, Edward

    2013-01-01

    In Texas, and some other states, there is a documented shortage of physics teachers, in terms of both number and qualifications. The shortage in Texas is due as much to teachers leaving the field (attrition) as to a lack of teachers entering. There are efforts under way to prepare more and better-qualified physics teachers who will stay in the…

  10. Regulating Abortion: Impact on Patients and Providers in Texas

    Science.gov (United States)

    Colman, Silvie; Joyce, Ted

    2011-01-01

    The State of Texas began enforcement of the Woman's Right to Know (WRTK) Act on January 1, 2004. The law requires that all abortions at or after 16 weeks' gestation be performed in an ambulatory surgical center (ASC). In the month the law went into effect, not one of Texas's 54 nonhospital abortion providers met the requirements of a surgical…

  11. Noteworthy: Fortune 500: Texas ties California for national lead

    OpenAIRE

    Michael Nicholson

    2010-01-01

    According to the 2010 Fortune 500, released in April, Texas hosts the headquarters of 57 of the nation's 500 largest companies, ranked by gross revenues. Texas secured its place as a Fortune 500 leader through its position as focal point of the domestic energy industry, its relatively strong economic growth over the past decade, and its relatively low tax rates and living costs.

  12. A comparison of crashes and fatalities in Texas by age group : selected cities in Texas.

    Science.gov (United States)

    2012-10-01

    In recent decades, great strides have been made to lower the number of accidents that occur on Texas roadways through graduated drivers licensing programs, messages against texting and driving, and discouraging drunk driving. Statistics show that you...

  13. BLM/OCS South Texas Outer Continental Shelf (STOCS) Project Sediment Data

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The South Texas Outer Continental Shelf Project (STOCS) conducted by the University of Texas and the USGS with funding from BLM/NOAA. The USGS produced geochemical...

  14. It's about time : investing in transportation to keep Texas economically competitive.

    Science.gov (United States)

    2011-03-01

    This current report, It's About Time: Investing in Transportation to Keep Texas : Economically Competitive, updates the February 2009 report by providing : an enhanced analysis of the current state of the Texas transportation system, : determining th...

  15. Site Study Plan for Aesthetics, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Aesthetic Site Study Plan describes a field program consisting of identification of the visually affected area; determination of scenic quality, visual sensitivity, and visual management classes of the site and vicinity; and analysis of the level of visual contrast that would be created by the project. Field ratings of scenic quality, visual sensitivity, and visual contrast will be supplemented by a public perception survey designed to incorporate the views of the public. This plan describes the need for the study, the study design, data management and use, schedule for proposed activities, and quality assurance program. This study will provide data needed to satisfy requirements contained in, or derived from, SRPO Requirement Document (SRP-RD). 35 refs., 6 figs., 2 tabs

  16. Investigation of nonlinear dynamic soil property at the Savannah River Site

    International Nuclear Information System (INIS)

    Lee, R.C.

    2000-01-01

    This document summarizes laboratory dynamic soil testing investigations conducted by the University of Texas at Austin (UTA) for the Savannah River Site (SRS) (Stokoe et al., 1995a, Stokoe et al., 1995b, Sponseller and Stokoe, 1995). The purpose of the investigation is to provide an evaluation of past testing results in the context of new test data and the development of consistent site wide models of material strain dependencies based upon geologic formation, depth, and relevant index properties

  17. 76 FR 76048 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-12-06

    ..., mercury, and selenium) and one semi-volatile organic compound (SVOC, pentachlorophenol) exceeded their... Marine of Port Arthur Superfund Site AGENCY: Environmental Protection Agency. ACTION: Direct final rule... Deletion of the State Marine of Port Arthur (SMPA) Superfund Site located in Port Arthur, Texas (Jefferson...

  18. Superfund Record of Decision (EPA region 2): Glen Ridge Radium site, Essex County, NJ. (Second remedial action), June 1990. Final report

    International Nuclear Information System (INIS)

    1990-01-01

    The 90-acre Glen Ridge Radium site is a residential community in the Borough of Glen Ridge, Essex County, New Jersey. The site is adjacent to another Superfund site, the Montclair/West Orange site. The Glen Ridge site includes a community of 274 properties serviced by surface reservoirs in northern New Jersey. In the early 1900s, a radium processing or utilization facility was located in the vicinity of the site. EPA investigations in 1981 and 1983 confirmed the presence of gamma radiation contamination in the Glen Ridge area and in several adjacent houses. The ROD complements the previous 1989 ROD for this site and provides a final remedy. The primary contaminant of concern affecting the soil is radium 226

  19. Texas Academy of Mathematics and Science: 25 Years of Early College STEM Opportunities

    Science.gov (United States)

    Sayler, Michael F.

    2015-01-01

    The University of North Texas's Texas Academy of Mathematics and Science began admitting students to its 2-year early college entrance science, technology, engineering, and mathematics (STEM) program in the fall of 1988. This program provided accelerated entry for top students in Texas in the areas of mathematics and science. Approximately 200…

  20. Evaluations of NOx and highly reactive VOC emission inventories in Texas and their implications for ozone plume simulations during the Texas Air Quality Study 2006

    NARCIS (Netherlands)

    Kim, S.-W.; McKeen, S.A.; Frost, G.J.; Lee, S.-H.; Trainer, M.; Richter, A.; Angevine, W. M.; Atlas, E.; Bianco, L.; Boersma, K.F.; Brioude, J.; Burrow, J.P.; Gouw, de J.; Fried, A.; Gleason, J.F.; Hilboll, A.; Mellqvist, J.; Peischl, J.; Richter, D.; Rivera, C.; Ryerson, T.; Lintel Hekkert, te L.; Walega, J.; Warneke, C.; Weibring, P.; Williams, E.

    2011-01-01

    Satellite and aircraft observations made during the 2006 Texas Air Quality Study (TexAQS) detected strong urban, industrial and power plant plumes in Texas. We simulated these plumes using the Weather Research and Forecasting-Chemistry (WRF-Chem) model with input from the US EPA's 2005 National

  1. The University of Texas Institute for Geophysics Marine Geology and Geophysics Field Course

    Science.gov (United States)

    Duncan, D.; Davis, M. B.; Goff, J. A.; Gulick, S. P. S.; McIntosh, K. D.; Saustrup, S., Sr.

    2014-12-01

    The University of Texas Institute for Geophysics, part of the Jackson School of Geosciences, annually offers a three-week marine geology and geophysics field course during the spring-summer intersession. The course provides hands-on instruction and training for graduate and upper-level undergraduate students in high-resolution seismic reflection, CHIRP sub-bottom profiling, multibeam bathymetry, sidescan sonar, several types of sediment coring, grab sampling, and the sedimentology of resulting seabed samples. Students participate in an initial three days of classroom instruction designed to communicate geological context of the field area along with theoretical and technical background on each field method. The class then travels to the Gulf Coast for a week of at-sea field work. Our field sites at Port Aransas, and Galveston, TX, and Grand Isle, LA, provide ideal locations for students to investigate coastal processes of the Gulf Coast and continental shelf through application of geophysical techniques in an exploratory mode. At sea, students assist with survey design and instrumentation set up while learning about acquisition parameters, data quality control, trouble-shooting, and safe instrument deployment and retrieval. In teams of four, students work in onshore field labs preparing sediment samples for particle size analysis and data processing. During the course's final week, teams return to the classroom where they integrate, interpret, and visualize data in a final project using industry-standard software such as Echos, Landmark, Caris, and Fledermaus. The course concludes with a series of final presentations and discussions in which students examine geologic history and/or sedimentary processes represented by the Gulf Coast continental shelf with academic and industry supporters. Students report a greater understanding of marine geology and geophysics through the course's intensive, hands-on, team approach and low instructor to student ratio (sixteen

  2. 33 CFR 110.197 - Galveston Harbor, Bolivar Roads Channel, Texas.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Galveston Harbor, Bolivar Roads Channel, Texas. 110.197 Section 110.197 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... Roads Channel, Texas. (a)(1) Anchorage area (A). The water bounded by a line connecting the following...

  3. Quantifying Potential Groundwater Recharge In South Texas

    Science.gov (United States)

    Basant, S.; Zhou, Y.; Leite, P. A.; Wilcox, B. P.

    2015-12-01

    Groundwater in South Texas is heavily relied on for human consumption and irrigation for food crops. Like most of the south west US, woody encroachment has altered the grassland ecosystems here too. While brush removal has been widely implemented in Texas with the objective of increasing groundwater recharge, the linkage between vegetation and groundwater recharge in South Texas is still unclear. Studies have been conducted to understand plant-root-water dynamics at the scale of plants. However, little work has been done to quantify the changes in soil water and deep percolation at the landscape scale. Modeling water flow through soil profiles can provide an estimate of the total water flowing into deep percolation. These models are especially powerful with parameterized and calibrated with long term soil water data. In this study we parameterize the HYDRUS soil water model using long term soil water data collected in Jim Wells County in South Texas. Soil water was measured at every 20 cm intervals up to a depth of 200 cm. The parameterized model will be used to simulate soil water dynamics under a variety of precipitation regimes ranging from well above normal to severe drought conditions. The results from the model will be compared with the changes in soil moisture profile observed in response to vegetation cover and treatments from a study in a similar. Comparative studies like this can be used to build new and strengthen existing hypotheses regarding deep percolation and the role of soil texture and vegetation in groundwater recharge.

  4. Texas floods of 1940

    Science.gov (United States)

    Breeding, Seth D.

    1948-01-01

    Floods occurred in Texas during, June, July, and November 1940 that exceeded known stages on many small streams and at a few places on the larger streams. Stages at several stream-gaging stations exceeded the maximum known at those places since the collection of daily records began. A storm, haying its axis generally on a north-south line from Cameron to Victoria and extending across the Brazos, Colorado, Lavaca, and Guadalupe River Basins, caused heavy rainfall over a large part of south-central Texas. The maximum recorded rain of 22.7 inches for the 2-day period June 29-30 occurred at Engle. Of this amount, 17.5 inches fell in the 12-hour period between 8 p.m. June 29, and 8 a.m. June 30. Light rains fell at a number of places on June 28, and additional light rains fell at many places within the area from July 1 to 4. During the period June 28 to July 4 more than 20 inches of rain fell over an area of 300 square miles, more than 15 inches over 1,920 square miles, and more than 10 inches over 5,100 square miles. The average annual rainfall for the area experiencing the heaviest rainfall during this storm is about 35 inches. Farming is largely confined to the fertile flood plains in much of the area subjected to the record-breaking floods in June and July. Therefore these floods, coming at the height of the growing season, caused severe losses to crops. Much damage was done also to highways and railways. The city of Hallettsville suffered the greatest damage of any urban area. The Lavaca River at that place reached a stage 8 feet higher than ever known before, drowned several people, destroyed many homes, and submerged almost the entire business district. The maximum discharge there was 93,100 second-feet from a drainage area of 101 square miles. Dry Creek near Smithville produced a maximum discharge of 1,879 second-feet from an area of 1.48 square miles and a runoff of 11.3 inches in a 2-day period from a rainfall of 19.5 inches. The area in the Colorado River

  5. A Study of the Aquaculture Industry in Texas to Assist in Establishing Aquaculture as a Course Offering in Agricultural Science and Technology. Final Report.

    Science.gov (United States)

    Dillingham, John; And Others

    A 1989-90 project determined the knowledge and skills necessary for employment in the aquaculture industry. The study identified technical materials and other resources available in private industry and higher education institutions. Two surveys determined the status of aquaculture in Texas school districts and identified tasks performed by…

  6. The siting record: An account of the programs of federal agencies and events that have led to the selection of a potential site for a geologic respository for high-level radioactive waste

    Energy Technology Data Exchange (ETDEWEB)

    Lomenick, T.F.

    1996-03-01

    This record of siting a geologic repository for high-level radioactive wastes (HLW) and spent fuel describes the many investigations that culminated on December 22, 1987 in the designation of Yucca Mountain (YM), as the site to undergo detailed geologic characterization. It recounts the important issues and events that have been instrumental in shaping the course of siting over the last three and one half decades. In this long task, which was initiated in 1954, more than 60 regions, areas, or sites involving nine different rock types have been investigated. This effort became sharply focused in 1983 with the identification of nine potentially suitable sites for the first repository. From these nine sites, five were subsequently nominated by the U.S. Department of Energy (DOE) as suitable for characterization and then, in 1986, as required by the Nuclear Waste Policy Act of 1982 (NWPA), three of these five were recommended to the President as candidates for site characterization. President Reagan approved the recommendation on May 28, 1986. DOE was preparing site characterization plans for the three candidate sites, namely Deaf Smith County, Texas; Hanford Site, Washington; and YM. As a consequence of the 1987 Amendment to the NWPA, only the latter was authorized to undergo detailed characterization. A final Site Characterization Plan for Yucca Mountain was published in 1988. Prior to 1954, there was no program for the siting of disposal facilities for high-level waste (HLW). In the 1940s and 1950s, the volume of waste, which was small and which resulted entirely from military weapons and research programs, was stored as a liquid in large steel tanks buried at geographically remote government installations principally in Washington and Tennessee.

  7. The siting record: An account of the programs of federal agencies and events that have led to the selection of a potential site for a geologic respository for high-level radioactive waste

    International Nuclear Information System (INIS)

    Lomenick, T.F.

    1996-03-01

    This record of siting a geologic repository for high-level radioactive wastes (HLW) and spent fuel describes the many investigations that culminated on December 22, 1987 in the designation of Yucca Mountain (YM), as the site to undergo detailed geologic characterization. It recounts the important issues and events that have been instrumental in shaping the course of siting over the last three and one half decades. In this long task, which was initiated in 1954, more than 60 regions, areas, or sites involving nine different rock types have been investigated. This effort became sharply focused in 1983 with the identification of nine potentially suitable sites for the first repository. From these nine sites, five were subsequently nominated by the U.S. Department of Energy (DOE) as suitable for characterization and then, in 1986, as required by the Nuclear Waste Policy Act of 1982 (NWPA), three of these five were recommended to the President as candidates for site characterization. President Reagan approved the recommendation on May 28, 1986. DOE was preparing site characterization plans for the three candidate sites, namely Deaf Smith County, Texas; Hanford Site, Washington; and YM. As a consequence of the 1987 Amendment to the NWPA, only the latter was authorized to undergo detailed characterization. A final Site Characterization Plan for Yucca Mountain was published in 1988. Prior to 1954, there was no program for the siting of disposal facilities for high-level waste (HLW). In the 1940s and 1950s, the volume of waste, which was small and which resulted entirely from military weapons and research programs, was stored as a liquid in large steel tanks buried at geographically remote government installations principally in Washington and Tennessee

  8. Bm86 midgut protein sequence variation in South Texas cattle fever ticks

    Directory of Open Access Journals (Sweden)

    Kammlah Diane M

    2010-11-01

    Full Text Available Abstract Background Cattle fever ticks, Rhipicephalus (Boophilus microplus and R. (B. annulatus, vector bovine and equine babesiosis, and have significantly expanded beyond the permanent quarantine zone established in South Texas. Currently, there are no vaccines approved for use within the United States for controlling these vectors. Vaccines developed in Australia and Cuba based on the midgut antigen Bm86 have variable efficacy against cattle fever ticks. A possible explanation for this variation in vaccine efficacy is amino acid sequence divergence between the recombinant Bm86 vaccine component and native Bm86 expressed in ticks from different geographical regions of the world. Results There was 91.8% amino acid sequence identity in Bm86 among R. microplus and R. annulatus sequenced from South Texas infestations. When South Texas isolates were compared to the Australian Yeerongpilly and Cuban Camcord vaccine strains, there was 89.8% and 90.0% identity, respectively. Most of the sequence divergence was focused in one region of the protein, amino acids 206-298. Hydrophilicity profiles revealed that two short regions of Bm86 (amino acids 206-210 and 560-570 appear to be more hydrophilic in South Texas isolates compared to vaccine strains. Only one amino acid difference was found between South Texas and vaccine strains within two previously described B-cell epitopes. A total of 4 amino acid differences were observed within three peptides previously shown to induce protective immune responses in cattle. Conclusions Sequence differences between South Texas isolates and Yeerongpilly and Camcord strains are spread throughout the entire Bm86 sequence, suggesting that geographic variation does exist. Differences within previously described B-cell epitopes between South Texas isolates and vaccine strains are minimal; however, short regions of hydrophilic amino acids found unique to South Texas isolates suggest that additional unique surface exposed

  9. Financial assurance for decontamination and decommissioning: a Texas perspective

    International Nuclear Information System (INIS)

    Rao, C.D.; Etter, S.D.; Dziuk, T.W.

    1986-01-01

    The Texas Department of Health (TDH) has the regulatory responsibility to ensure that funds are available for decontamination, decommissioning, and reclamation of uranium recovery facilities in Texas. Uranium recovery licensees are required to post financial security with the Agency for that purpose. Texas uranium facilities include (1) conventional surface mining and milling plants, including tailings ponds, and (2) in situ solution mining plants, each with somewhat different cost elements for decontamination, decommissioning, reclamation, and closure. Cost estimates for decontamination, decommissioning, and reclamation, along with a facility closure plan, are initially submitted to the Agency by the licensees. These are verified and compared with detailed independent cost estimates prepared by Agency staff. Significant differences between the two estimates are examined and resolved by negotiation and/or recalculation to the satisfaction of the state. The Texas philosophy for maintaining financial security permits flexibility in the closure plan without jeopardizing or compromising the ultimate long-term objectives of closure. Review of closure plans incorporates new technological developments In contrast, financial security is established expeditiously by applying the best available cost data to necessarily conservative estimates of the work involved. Financial security cost estimates are subject to annual review and adjustment

  10. Site Study Plan for meteorology/air quality, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Meteorological/Air Quality Site Study Plan describes a field program consisting of continuous measurements of surface (10-meter) wind speed and direction, temperature, humidity, dew point, pressure, and sensible heat flux (vertical). Air quality measurements will be limited to suspended particulate matter. After the first year of measurements, a 60-meter tower will be added to incorporate measurements needed for later modeling and dose calculations; these will include upper level winds, vertical temperature structure, and vertical wind speed. All of these measurements will be made at a site located within the 9-mi 2 site area but remote from the ESF. A second site, located near and downwind from the ESF, will monitor only particulate matter. The SSP describes the need for each study; its design and design rationale; analysis, management, and use of data, schedule of field activities, organization of field personnel and sample management, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from the Salt Repository Project Requirements Document. 38 refs., 8 figs., 3 tabs

  11. Petroleum hydrocarbons in sediment from the northern Gulf of Mexico shoreline, Texas to Florida

    Science.gov (United States)

    Rosenbauer, Robert J.; Campbell, Pamela L.; Lam, Angela; Lorenson, T.D.; Hostettler, Frances D.; Thomas, Burt; Wong, Florence L.

    2011-01-01

    Petroleum hydrocarbons were extracted and analyzed from shoreline sediment collected from the northern Gulf of Mexico (nGOM) coastline that could potentially be impacted by Macondo-1 (M-1) well oil. Sediment was collected before M-1 well oil made significant local landfall and analyzed for baseline conditions by a suite of diagnostic petroleum biomarkers. Oil residue in trace quantities was detected in 45 of 69 samples. With the aid of multivariate statistical analysis, three different oil groups, based on biomarker similarity, were identified that were distributed geographically along the nGOM from Texas to Florida. None of the sediment hydrocarbon extracts correlated with the M-1 well oil extract, however, the similarity of tarballs collected at one site (FL-18) with the M-1 well oil suggests that some oil from the Deepwater Horizon spill may have been transported to this site in the Florida Keys, perhaps by a loop current, before that site was sampled.

  12. Site study plan for EDBH [Engineering Design Boreholes] seismic surveys, Deaf Smith County site, Texas: Revision 1

    International Nuclear Information System (INIS)

    Hume, H.

    1987-12-01

    This site study plan describes seismic reflection surveys to run north-south and east-west across the Deaf Smith County site, and intersecting near the Engineering Design Boreholes (EDBH). Both conventional and shallow high-resolution surveys will be run. The field program has been designed to acquire subsurface geologic and stratigraphic data to address information/data needs resulting from Federal and State regulations and Repository program requirements. The data acquired by the conventional surveys will be common-depth- point, seismic reflection data optimized for reflection events that indicate geologic structure near the repository horizon. The data will also resolve the basement structure and shallow reflection events up to about the top of the evaporite sequence. Field acquisition includes a testing phase to check/select parameters and a production phase. The field data will be subjected immediately to conventional data processing and interpretation to determine if there are any anamolous structural for stratigraphic conditions that could affect the choice of the EDBH sites. After the EDBH's have been drilled and logged, including vertical seismic profiling, the data will be reprocessed and reinterpreted for detailed structural and stratigraphic information to guide shaft development. The shallow high-resulition seismic reflection lines will be run along the same alignments, but the lines will be shorter and limited to immediate vicinity of the EDBH sites. These lines are planned to detect faults or thick channel sands that may be present at the EDBH sites. 23 refs. , 7 figs., 5 tabs

  13. Streamflow gain and loss and water quality in the upper Nueces River Basin, south-central Texas, 2008-10

    Science.gov (United States)

    Banta, J. Ryan; Lambert, Rebecca B.; Slattery, Richard N.; Ockerman, Darwin J.

    2012-01-01

    The U.S. Geological Survey-in cooperation with the U.S. Army Corps of Engineers, The Nature Conservancy, the Real Edwards Conservation and Reclamation District, and the Texas Parks and Wildlife Department-investigated streamflow gain and loss and water quality in the upper Nueces River Basin, south-central Texas, specifically in the watersheds of the West Nueces, Nueces, Dry Frio, Frio, and Sabinal Rivers upstream from the Edwards aquifer outcrop. Streamflow in these rivers is sustained by groundwater contributions (for example, from springs) and storm runoff from rainfall events. To date (2012), there are few data available that describe streamflow and water-quality conditions of the rivers within the upper Nueces River Basin. This report describes streamflow gain-loss characteristics from three reconnaissance-level synoptic measurement surveys (hereinafter referred to as "surveys") during 2008-10 in the upper Nueces River Basin. To help characterize the hydrology, groundwater-level measurements were made, and water-quality samples were collected from both surface-water and groundwater sites in the study area from two surveys during 2009-10. The hydrologic (streamflow, springflow, and groundwater) measurements were made during three reconnaissance-level synoptic measurement surveys occurring in July 21-23, 2008; August 8-18, 2009; and March 22-24, 2010. These survey periods were selected to represent different hydrologic conditions. Streamflow gains and losses were based on streamflow and springflow measurements made at 74 sites in the study area, although not all sites were measured during each survey. Possible water chemistry relations among sample types (streamflow, springflow, or groundwater), between surveys, and among watersheds were examined using water-quality samples collected from as many as 20 sites in the study area.

  14. Annual report for the High Energy Physics Program at Texas A and M University, October 1, 1993--September 30, 1994

    International Nuclear Information System (INIS)

    1994-10-01

    The experimental and theoretical high energy physics programs at Texas A and M University have continued their ambitious research activities over the past year. On the experimental side, the authors have continued their participation in two major operating experiments, CDF and MACRO, and each of these programs have attained significant milestones during this period. Especially note worthy is the CDF Collaborations paper on the ''evidence'' for the top quark and MACRO's completion of the construction of the ''Attico''. In CDF, the Texas A and M group continues to play a leading role in the plans for upgrading the silicon vertex detector, as well as supporting the on going running of this experiment during its current data taking run. In addition, the group has focused its analysis efforts on studies of trilepton events and as well searching for supersymmetric particles. In MACRO, the authors have continued their work on the development of the final version of the wave form digitizing system. Within the past month the final production circuits have been assembled and they are currently testing these units at Texas A and M. The authors plan to complete this testing and commission the wave form digitizing system on the MACRO detector by the end of 1994. The theoretical high energy physics program has also continued to develop during the past funding cycle. D. Nanopoulos and colleagues have continued the study of their very successful string-derived model that unifies all known interactions; flipped SU(5), which is the leading candidate for a theory of everything. C. Pope has continued his work on generalizations of the symmetries of string theory, known as W algebras

  15. 76 FR 62087 - Draft Conservation Plan and Draft Environmental Assessment; Dunes Sagebrush Lizard, Texas

    Science.gov (United States)

    2011-10-06

    ...] Draft Conservation Plan and Draft Environmental Assessment; Dunes Sagebrush Lizard, Texas AGENCY: Fish... draft Texas Conservation Plan for the Dunes Sagebrush Lizard (TCP). The draft TCP will function as a... the Applicant for the dunes sagebrush lizard (Sceloporus arenicolus) throughout its range in Texas...

  16. Biogeochemical Impact of Hurricane Harvey on Texas Coastal Lagoons

    Science.gov (United States)

    Montagna, P.; Hu, X.; Walker, L.; Wetz, M.

    2017-12-01

    Hurricane Harvey made landfall Friday 25 August 2017 as a Category 4 hurricane, which is the strongest hurricane to hit the middle Texas coast since Carla in 1961. After the wind storm and storm surge, coastal flooding occurred due to the storm lingering over Texas for four more days, dumping as much as 50" of rain near Houston, producing 1:1000 year flood event. The Texas coast is characterized by lagoons behind barrier islands, and their ecology and biogeochemistry are strongly influenced by coastal hydrology. The ensuing inflow event replaced brackish water with fresh water that was high in inorganic an organic matter, significantly enhancing respiration of coastal blue carbon, and dissolved oxygen went to zero for a long period of time. Recovery will likely take months or nearly one year.

  17. 75 FR 76038 - Zach System Corporation a Subdivision of Zambon Company, SPA Including On-Site Leased Workers of...

    Science.gov (United States)

    2010-12-07

    ... Subdivision of Zambon Company, SPA Including On-Site Leased Workers of Turner Industries and Go Johnson, La..., including on-site leased workers from Turner Industries and Go Johnson, La Porte, Texas. The Department's... investigation revealed that Zach System Corporation is a subdivision of Zambon Company, SPA, not Zach System SPA...

  18. Assessment of the economic implications of 10CFR61 on the south Texas project

    International Nuclear Information System (INIS)

    Kniazewyez, B.G.; Turner, C.M.

    1984-01-01

    The State of Texas, as an Agreement State, is developing Texas Part 45, ''Licensing Requirements fo Near-Surface Land Disposal of Radioactive Waste'' to implement the intent of the Nuclear Regulatory Commission's (NRC) Title 10 to the Code of Federal Regulations, Part 61 (10CFR61) ''Licensing Requirement for Land Disposal of Radioactive Waste.'' This paper addresses the potential economic impact of the proposed Texas Part 45 and 10CFR61 on the South Texas Project (STP). The Texas Department of Health is developing the proposed rule making Texas Part 45 pertaining to land disposal of radioactive waste, which together with proposed amendments to related portions of Texas Parts 11 and 21, provide the licensing procedures, performance objectives, and technical criteria for licensing disposal facilities. These regulations establish requirements concerning allowable waste forms, classification, packaging, and labeling of waste, as well as acceptable shipping records and manifests. Thus, the regulations' impact upon a nuclear power plant such as STP include not only shipping and disposal costs, but also the costs of proper preparation, classification, and labeling of waste, and the cost of associated record keeping and paperwork required for compliance with the regulations

  19. Predicting Student Success on the Texas Chemistry STAAR Test: A Logistic Regression Analysis

    Science.gov (United States)

    Johnson, William L.; Johnson, Annabel M.; Johnson, Jared

    2012-01-01

    Background: The context is the new Texas STAAR end-of-course testing program. Purpose: The authors developed a logistic regression model to predict who would pass-or-fail the new Texas chemistry STAAR end-of-course exam. Setting: Robert E. Lee High School (5A) with an enrollment of 2700 students, Tyler, Texas. Date of the study was the 2011-2012…

  20. The procedure of alternative site selection within the report of the study group on the radioactive waste final repository selection process (AKEnd)

    International Nuclear Information System (INIS)

    Brenner, M.

    2005-01-01

    The paper discusses the results of the report of the study group on the radioactive waste final repository selection process with respect to the alternative site selection procedure. Key points of the report are the long-term safety, the alternativity of sites and the concept of one repository. The critique on this report is focussed on the topics site selection and licensing procedures, civil participation, the factor time and the question of cost