WorldWideScience

Sample records for site survey schedule

  1. Bat Surveys of Retired Facilitiies Scheduled for Demolition by Washington Closure Hanford

    Energy Technology Data Exchange (ETDEWEB)

    Gano, K. A.; Lucas, J. G.; Lindsey, C. T.

    2011-06-30

    This project was conducted to evaluate buildings and facilities remaining in the Washington Closure Hanford (WCH) deactivation, decontamination, decommissioning, and demolition schedule for bat roost sites. The project began in spring of 2009 and was concluded in spring of 2011. A total of 196 buildings and facilities were evaluated for the presence of bat roosting sites. The schedule for the project was prioritized to accommodate the demolition schedule. As the surveys were completed, the results were provided to the project managers to facilitate planning and project completion. The surveys took place in the 300 Area, 400 Area, 100-H, 100-D, 100-N, and 100-B/C Area. This report is the culmination of all the bat surveys and summarizes the findings by area and includes recommended mitigation actions where bat roosts were found.

  2. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  3. 5 CFR 532.207 - Time schedule for wage surveys.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Time schedule for wage surveys. 532.207... PREVAILING RATE SYSTEMS Prevailing Rate Determinations § 532.207 Time schedule for wage surveys. (a) Wage... and the collection of wage data by visits to establishments. (c) A wage-change survey shall be made...

  4. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  5. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2010-01-08

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by Pacific Northwest National Laboratory for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford Site environs per regulatory requirements. This document contains the calendar year 2010 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and the Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2010, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2010.

  6. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    2000-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection

  7. Survey of siting practices for selected management projects in seven countries

    International Nuclear Information System (INIS)

    Hardin, E.; Aahagen, H.

    1992-06-01

    This paper surveys siting practices for deep geologic disposal in seven countries, and attempts to formulate generalizations which could be useful for the upcoming review of the Swedish plan for siting the SFL repository (R and D 92). Comparison of projects in different countries is done with full appreciation of the technical, legal, and cultural differences. The seven countries were selected for experience with siting in crystalline rock, similarity of siting practices to Sweden, and the availability of published information. Local governments have demonstrated effective veto power in each of the seven countries surveyed, although this power is exercised in different ways. This paper shows how the siting strategy itself affects the ability and the inclination of localities to block the project. It shows by example that public involvement, parallel vs. sequential characterization, schedule for siting activities, and the existence of interim waste storage capability have an impact on the success of siting. The focus of this paper is deep geologic disposal. Shallow land disposal and non-radioactive wastes are not discussed in detail, with three exceptions: LLW disposal siting in the U.S. and Canada, and the SAKAB incinerator projects in Sweden. These provide insight into siting approaches and demonstrate that conclusions regarding deep geologic disposal are supported by other experience. (114 refs.) (au)

  8. Hanford site environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1998-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1 open-quotes General Environmental Protection Program,close quotes and DOE Order 5400.5, open-quotes Radiation Protection of the Public and the Environment.close quotes The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 2, U.S. Department of Energy, Richland, Washington. This document contains the 1998 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section of this document describes the planned sampling schedule for a specific media (air, surface water, biota, soil and vegetation, sediment, and external radiation). Each section includes the sample location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be planned for 1998 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing sample locations

  9. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2008-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by Pacific Northwest National Laboratory for the U.S. Department of Energy. Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1, "Environmental Protection Program," and DOE Order 5400.5, "Radiation Protection of the Public and the Environment." The environmental surveillance sampling design is described in the "Hanford Site Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office." This document contains the calendar year 2008 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2008, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2008.

  10. Decommissioning strategy and schedule for a multiple reactor nuclear power plant site

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Deiglys Borges; Moreira, Joao M.L.; Maiorino, Jose Rubens, E-mail: deiglys.monteiro@ufabc.edu.br, E-mail: joao.moreira@ufabc.edu.br, E-mail: joserubens.maiorino@ufabc.edu.br [Universidade Federal do ABC (CECS/UFABC), Santo Andre, SP (Brazil). Centro de Engenharia, Modelagem e Ciencias Aplicadas

    2015-07-01

    The decommissioning is an important part of every Nuclear Power Plant life cycle gaining importance when there are more than one plant at the same site due to interactions that can arise from the operational ones and a decommissioning plant. In order to prevent undesirable problems, a suitable strategy and a very rigorous schedule should implemented and carried. In this way, decommissioning tasks such as fully decontamination and dismantling of activated and contaminated systems, rooms and structures could be delayed, posing as an interesting option to multiple reactor sites. The present work aims to purpose a strategy and a schedule for the decommissioning of a multiple reactor site highlighting the benefits of delay operational tasks and constructs some auxiliary services in the site during the stand by period of the shutdown plants. As a case study, will be presented a three-reactor site which the decommissioning process actually is in planning stage and that should start in the next decade. (author)

  11. Decommissioning strategy and schedule for a multiple reactor nuclear power plant site

    International Nuclear Information System (INIS)

    Monteiro, Deiglys Borges; Moreira, Joao M.L.; Maiorino, Jose Rubens

    2015-01-01

    The decommissioning is an important part of every Nuclear Power Plant life cycle gaining importance when there are more than one plant at the same site due to interactions that can arise from the operational ones and a decommissioning plant. In order to prevent undesirable problems, a suitable strategy and a very rigorous schedule should implemented and carried. In this way, decommissioning tasks such as fully decontamination and dismantling of activated and contaminated systems, rooms and structures could be delayed, posing as an interesting option to multiple reactor sites. The present work aims to purpose a strategy and a schedule for the decommissioning of a multiple reactor site highlighting the benefits of delay operational tasks and constructs some auxiliary services in the site during the stand by period of the shutdown plants. As a case study, will be presented a three-reactor site which the decommissioning process actually is in planning stage and that should start in the next decade. (author)

  12. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1999-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations

  13. SMART operational field test evaluation : scheduler survey report : final report

    Science.gov (United States)

    1997-06-01

    The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automatic scheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans to implement ITS as a site for an operational field test. The pur...

  14. Master schedule for CY-1982 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1981-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. The environmental surveillance program objectives are to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided does not include samples which are planned to be collected during FY-1982 in support of special studies or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in Site operations, program requirements, or unusual sample results. Sampling schedules are presented for the following: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurements; portable instrument surveys; and surveillance of waste disposal sites

  15. An UAV scheduling and planning method for post-disaster survey

    Science.gov (United States)

    Li, G. Q.; Zhou, X. G.; Yin, J.; Xiao, Q. Y.

    2014-11-01

    Annually, the extreme climate and special geological environments lead to frequent natural disasters, e.g., earthquakes, floods, etc. The disasters often bring serious casualties and enormous economic losses. Post-disaster surveying is very important for disaster relief and assessment. As the Unmanned Aerial Vehicle (UAV) remote sensing with the advantage of high efficiency, high precision, high flexibility, and low cost, it is widely used in emergency surveying in recent years. As the UAVs used in emergency surveying cannot stop and wait for the happening of the disaster, when the disaster happens the UAVs usually are working at everywhere. In order to improve the emergency surveying efficiency, it is needed to track the UAVs and assign the emergency surveying task for each selected UAV. Therefore, a UAV tracking and scheduling method for post-disaster survey is presented in this paper. In this method, Global Positioning System (GPS), and GSM network are used to track the UAVs; an emergency tracking UAV information database is built in advance by registration, the database at least includes the following information, e.g., the ID of the UAVs, the communication number of the UAVs; when catastrophe happens, the real time location of all UAVs in the database will be gotten using emergency tracking method at first, then the traffic cost time for all UAVs to the disaster region will be calculated based on the UAVs' the real time location and the road network using the nearest services analysis algorithm; the disaster region is subdivided to several emergency surveying regions based on DEM, area, and the population distribution map; the emergency surveying regions are assigned to the appropriated UAV according to shortest cost time rule. The UAVs tracking and scheduling prototype is implemented using SQLServer2008, ArcEnginge 10.1 SDK, Visual Studio 2010 C#, Android, SMS Modem, and Google Maps API.

  16. California LLW disposal site development update: Ahead of milestone schedule

    International Nuclear Information System (INIS)

    Romano, S.A.; Gaynor, R.K.

    1987-01-01

    US Ecology has been designated by the State of California to locate, develop and operate a low-level radioactive waste disposal facility. In early 1986, the firm identified eighteen desert basins in southeastern California for siting consideration. Three candidate sites were selected for detailed field characterization work in February, 1987. A preferred site for licensing purposes will be identified in early 1988. California is currently ahead of the siting milestone schedule mandated by the Low-Level Radioactive Waste Policy Amendments Act. It is likely that a license application will be filed before the 1990 milestone date. This paper describes the process undertaken by US Ecology to identify three candidates sites for characterization, and the public involvement program supporting this decision. Future activities leading to final site development are also described

  17. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2009-01-20

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory for the U.S. Department of Energy. Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1 and DOE Order 5400.5. This document contains the calendar year 2009 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2009, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2009.

  18. 15 CFR 714.1 - Annual declaration requirements for plant sites that produce a Schedule 3 chemical in excess of...

    Science.gov (United States)

    2010-01-01

    ... plant sites that produce a Schedule 3 chemical in excess of 30 metric tons. 714.1 Section 714.1 Commerce... SCHEDULE 3 CHEMICALS § 714.1 Annual declaration requirements for plant sites that produce a Schedule 3... in the production of a chemical in any units within the same plant through chemical reaction...

  19. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  20. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  1. Site survey for nuclear power plants

    International Nuclear Information System (INIS)

    1984-01-01

    This Safety Guide describes the first stage of the siting process for nuclear power plants - the site survey to select one or more preferred candidate sites. Its purpose is to recommend procedures and provide information for use in implementing a part of the Code of Practice on Safety in Nuclear Power Plant Siting (IAEA Safety Series No.50-C-S). The organization, procedures, methodologies, guidance for documenting the site survey process and examples of detailed procedures on some safety-related site characteristics are given in the Guide

  2. Master schedule for CY-1981 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1980-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site is provided. Questions about specific entries should be referred to the authors since modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in Manual Chapter 0513, and to monitor Hanford operations for compliance with applicable environmental criteria given in Manual Chapter 0524 and Washington State Water Quality Standards. Air quality data obtained in a separate program are also reported. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Schedules are presented for the following subjects: air, Columbia River, sanitary water, surface water, ground water, foodstuffs, wildlife, soil and vegetation, external radiation measurement, portable instrument surveys, and surveillance of waste disposal sites

  3. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  4. Environmental Survey preliminary report, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs

  5. Environmental Survey preliminary report, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1987-08-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs.

  6. Fears of Children in the United States: An Examination of the American Fear Survey Schedule with 20 New Contemporary Fear Items

    Science.gov (United States)

    Burnham, Joy J.

    2005-01-01

    Twenty contemporary fears (e.g., terrorist attacks, drive-by shootings, having to fight in a war) were added to E. Gullone and N. J. King's (1992) Australian Fear Survey Schedule for Children-II for use in the United States. The revised survey, the American Fear Survey Schedule for Children (J. J. Burnham, 1995), was investigated. The component…

  7. Quarterly environmental radiological survey summary - second quarter 1997 100, 200, 300, and 600 areas

    International Nuclear Information System (INIS)

    McKinney, S.M.; Marks, B.M.

    1997-01-01

    This report provides a summary of the radiological surveys performed in support of near-facility environmental monitoring at the Hanford Site. The Second Quarter 1997 survey results and the status of actions required are summarized below: All of the routine environmental radiological surveys scheduled during April, May, and June 1997, were performed as planned with the exception of UN-216-E-9. This site was not surveyed as stabilization activities were in progress. The sites scheduled for the Environmental Restorations Contractor (ERC) team were switched with those identified for the third quarter as there was a conflict with vegetation management activities

  8. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2005-01-19

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This document contains the calendar year 2005 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project.

  9. Biological variables for the site survey of surface ecosystems - existing data and survey methods

    International Nuclear Information System (INIS)

    Kylaekorpi, Lasse; Berggren, Jens; Larsson, Mats; Liberg, Maria; Rydgren, Bernt

    2000-06-01

    In the process of selecting a safe and environmentally acceptable location for the deep level repository of nuclear waste, site surveys will be carried out. These site surveys will also include studies of the biota at the site, in order to assure that the chosen site will not conflict with important ecological interests, and to establish a thorough baseline for future impact assessments and monitoring programmes. As a preparation to the site survey programme, a review of the variables that need to be surveyed is conducted. This report contains the review for some of those variables. For each variable, existing data sources and their characteristics are listed. For those variables for which existing data sources are inadequate, suggestions are made for appropriate methods that will enable the establishment of an acceptable baseline. In this report the following variables are reviewed: Fishery, Landscape, Vegetation types, Key biotopes, Species (flora and fauna), Red-listed species (flora and fauna), Biomass (flora and fauna), Water level, water retention time (incl. water body and flow), Nutrients/toxins, Oxygen concentration, Layering, stratification, Light conditions/transparency, Temperature, Sediment transport, (Marine environments are excluded from this review). For a major part of the variables, the existing data coverage is most likely insufficient. Both the temporal and/or the geographical resolution is often limited, which means that complementary surveys must be performed during (or before) the site surveys. It is, however, in general difficult to make exact judgements on the extent of existing data, and also to give suggestions for relevant methods to use in the site surveys. This can be finally decided only when the locations for the sites are decided upon. The relevance of the different variables also depends on the environmental characteristics of the sites. Therefore, we suggest that when the survey sites are selected, an additional review is

  10. Biological variables for the site survey of surface ecosystems - existing data and survey methods

    Energy Technology Data Exchange (ETDEWEB)

    Kylaekorpi, Lasse; Berggren, Jens; Larsson, Mats; Liberg, Maria; Rydgren, Bernt [SwedPower AB, Stockholm (Sweden)

    2000-06-01

    In the process of selecting a safe and environmentally acceptable location for the deep level repository of nuclear waste, site surveys will be carried out. These site surveys will also include studies of the biota at the site, in order to assure that the chosen site will not conflict with important ecological interests, and to establish a thorough baseline for future impact assessments and monitoring programmes. As a preparation to the site survey programme, a review of the variables that need to be surveyed is conducted. This report contains the review for some of those variables. For each variable, existing data sources and their characteristics are listed. For those variables for which existing data sources are inadequate, suggestions are made for appropriate methods that will enable the establishment of an acceptable baseline. In this report the following variables are reviewed: Fishery, Landscape, Vegetation types, Key biotopes, Species (flora and fauna), Red-listed species (flora and fauna), Biomass (flora and fauna), Water level, water retention time (incl. water body and flow), Nutrients/toxins, Oxygen concentration, Layering, stratification, Light conditions/transparency, Temperature, Sediment transport, (Marine environments are excluded from this review). For a major part of the variables, the existing data coverage is most likely insufficient. Both the temporal and/or the geographical resolution is often limited, which means that complementary surveys must be performed during (or before) the site surveys. It is, however, in general difficult to make exact judgements on the extent of existing data, and also to give suggestions for relevant methods to use in the site surveys. This can be finally decided only when the locations for the sites are decided upon. The relevance of the different variables also depends on the environmental characteristics of the sites. Therefore, we suggest that when the survey sites are selected, an additional review is

  11. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    International Nuclear Information System (INIS)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-01-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  12. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    Energy Technology Data Exchange (ETDEWEB)

    Ferguson Jones, Andrea; Lee, Angela [MMM Group Limited, 100 Commerce Valley Drive West, Thornhill, Ontario, L3T 0A1 (Canada); Palmeter, Tim [Public Works and Government Services Canada, 4900 Yonge Street, Toronto, Ontario, M2N 6A6 (Canada)

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  13. Chinese large solar telescopes site survey

    Science.gov (United States)

    Liu, Yu

    2017-04-01

    In order to observe the solar surface with unprecedentedly higher resolution, Chinse solar physics society decided to launch their solar site survey project in 2010 as the first step to look for the best candidate sites for the Chinese next-generation large-aperture solar telescopes, i.e., the 5-8 meter Chinese Giant Solar Telescope, and the 1 meter level coronagraph. We have built two long-term monitoring sites in Daocheng, with altitudes of around 4800 meters above the sea level located in the large Shangri-La mountain area, and we have collected systematic site data since 2014. Clear evidence, including the key parameters of seeing factor, sky brightness and water vapor content, has indicated that the large Shangri-La area owns the potential conditions of excellent seeing level and sufficient amount of clear-sky hours suitable for developing large solar telescopes. We will review the site survey progress and present the preliminary statistical results in this talk.

  14. Environmental Survey preliminary report, Nevada Test Site, Mercury, Nevada

    International Nuclear Information System (INIS)

    1988-04-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Nevada Test Site (NTS), conducted June 22 through July 10, 1987. The Survey is being conducted by a multidisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the NTS. The Survey covers all environment media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations and activities performed at the NTS, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by the Battelle Columbus Division under contract with DOE. When completed, the results will be incorporated into the NTS Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the NTS Survey. 165 refs., 42 figs., 52 tabs

  15. Tidal energy site - Tidal energy site mammal/bird survey

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A vessel-based line visual transect survey was conducted for birds and marine mammals near the proposed Snohomish County PUD Admiralty Inlet tidal energy site...

  16. 2011 Annual Ecological Survey: Pacific Northwest National Laboratory Site

    Energy Technology Data Exchange (ETDEWEB)

    Becker, James M.; Chamness, Michele A.

    2012-02-27

    The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL site comply with applicable laws, policies, and DOE Orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL site is described in Larson and Downs (2009). There are currently two facilities on the PNNL site: the William R. Wiley Environmental Molecular Sciences Laboratory and the Physical Sciences Facility. This report describes the annual survey of biological resources found on the undeveloped upland portions of the PNNL site. The annual survey is comprised of a series of individual field surveys conducted on various days in late May and throughout June 2011. A brief description of the methods PNNL ecologists used to conduct the baseline surveys and a summary of the results of the surveys are presented. Appendix A provides a list of plant and animal species identified in the

  17. A Literature Survey for Earliness/Tardiness Scheduling Problems with Learning Effect

    Directory of Open Access Journals (Sweden)

    Mesut Cemil İŞLER

    2009-02-01

    Full Text Available When a task or work is done continuously, there will be an experience so following times needs of required resources (manpower, materials, etc. will be reduced. This learning curve described first by Wright. Wright determined how workmanship costs decreased while proceed plain increasing. This investigations correctness found consistent by plain producers. Learning effect is an effect that, works can be done in shorter time in the rate of repeat of work with repeating same or similar works in production process. Nowadays classical production systems adapted more acceptable systems with new approaches. Just in time production system (JIT philosophy is one of the most important production system philosophies. JIT which is known production without stock stands on using all product resources optimum. Minimization problem of Earliness/Tardiness finishing penalty, which we can describe Just in time scheduling, appeared by inspired from JIT philosophy. In this study, there is literature survey which directed to earliness/tardiness performance criteria and learning effect processing in scheduling and as a result of this it is obtained some establishing for literature.

  18. Multiagency radiation survey and site investigation manual (MARSSIM): Survey design

    International Nuclear Information System (INIS)

    Abelquist, E.W.; Berger, J.D.

    1996-01-01

    This paper describes the MultiAgency Radiation Survey and Site Investigation Manual (MARSSIM) strategy for designing a final status survey. The purpose of the final status survey is to demonstrate that release criteria established by the regulatory agency have been met. Survey design begins with identification of the contaminants and determination of whether the radionuclides of concern exist in background. The decommissioned site is segregated into Class 1, Class 2, and Class 3 areas, based on contamination potential, and each area is further divided into survey units. Appropriate reference areas for indoor and outdoor background measurements are selected. Survey instrumentation and techniques are selected in order to assure that the instrumentation is capable of detecting the contamination at the derived concentration guideline level (DCGL). Survey reference systems are established and the number of survey data points is determined-with the required number of data points distributed on a triangular grid Pattern. Two suitistical tests are used to evaluate data from final status surveys. For contaminants that are b, present in background, the Wilcoxon Rank Sum test is used; for contaminants that are not present in background, the Wilcoxon Signed Rank (or Sign) test is used. The number of data points needed to satisfy these nonparametric tests is based on the contaminant DCGL value, the expected Standard deviation of the contaminant in background and in the survey unit, and the acceptable probability of making Type I and Type II decision errors. The MARSSIM also requires a reasonable level of assurance that any small areas of elevated residual radioactivity that could be significant relative to regulatory limits are not missed during the final status survey. Measurements and sampling on a specified grid size are used to obtain an adequate assurance level that small locations of elevated radioactivity will Still satisfy DCGLs-applicable to small areas

  19. Environmental Survey preliminary report, Nevada Test Site, Mercury, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    1988-04-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Nevada Test Site (NTS), conducted June 22 through July 10, 1987. The Survey is being conducted by a multidisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the NTS. The Survey covers all environment media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations and activities performed at the NTS, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by the Battelle Columbus Division under contract with DOE. When completed, the results will be incorporated into the NTS Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the NTS Survey. 165 refs., 42 figs., 52 tabs.

  20. Site Specific Advisory Board initiative, evaluation survey results supplementary appendix: Summary of individual site results

    International Nuclear Information System (INIS)

    1996-08-01

    This Appendix presents results of the Site-Specific Advisory Board (SSAB) Initiative for each of the 11 sites that participated in the survey. These individual results are a supplement to the June 1996 Summary Report which presented overall survey results. Results are presented in 11 sections, arranged alphabetically by site. Each section includes a series of figures and tables that parallel those presented in the Summary Report. To facilitate comparison, figures are presented both for the individual site and for the overall long survey. The sequence of sections is: Fernald, Hanford, Idaho, Los Alamos, Monticello, Nevada, Pantex, Rocky Flats, St. Louis, Sandia, and Savannah River

  1. Aerial radiological surveys of Steed Pond, Savannah River Site: Dates of surveys, 1984--1989

    International Nuclear Information System (INIS)

    Fritzsche, A.E.; Jobst, J.E.

    1993-09-01

    From June 1984 to August 1985, three aerial radiological surveys were conducted over Steed Pond at the Savannah River Site in South Carolina. In addition, Steed Pond was included in larger-area surveys of the Savannah River Site in subsequent years. The surveys were conducted by the Remote Sensing Laboratory of EG ampersand G Energy Measurements, Inc., Las Vegas, Nevada, for the US Department of Energy. Airborne measurements were obtained for both natural and man-made gamma radiation over Steed Pond and surrounding areas. The first survey was conducted when the pond was filled to normal capacity for the time of the year. On September 1, 1984, the Steed Pond dam spillway failed causing the pond to drain. The four subsequent surveys were conducted with the pond drained. The second survey and the third were conducted to study silt deposits exposed by the drop in water level after the spillway's opening. Steed Pond data from the February 1987 and April 1989 Savannah River Site surveys have been included to bring this study up to date

  2. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  3. Automated extinction monitor for the NLOT site survey

    Science.gov (United States)

    Kumar Sharma, Tarun

    In order to search a few potential sites for the National Large Optical Telescope (NLOT) project, we have initiated a site survey program. Since, most of instruments used for the site survey are custom made, we also started developing our own site characterization instruments. In this process we have designed and developed a device called Automated Extinction Monitor (AEM) and installed the same at IAO, Hanle. The AEM is a small wide field robotic telescope, dedicated to record atmospheric extinction in one or more photometric bands. It gives very accurate statistics of the distribution of photometric nights. In addition to this, instrument also provides the measurement of sky brightness. Here we briefly describe overall instrument and initial results obtained.

  4. Formerly utilized MED/AEC sites remedial action program. Radiological survey of the Harshaw Chemical Company, Cleveland, Ohio

    International Nuclear Information System (INIS)

    Wynveen, R.A.; Smith, W.H.; Sholeen, C.M.; Justus, A.L.; Flynn, K.F.

    1984-04-01

    During the MED/AEC era, the Harshaw Chemical Company processed large quantities of normal uranium to produce both oxide and fluoride compounds. This work was done under contract to MED and its successor, AEC. Records indicated that at the time the AEC contract was terminated, the facility was decontaminated by Harshaw and released from AEC control in 1960. However, a search of AEC records indicated that documentation was insufficient to determine whether the decontamination work was adequate by current guidelines. Hence, a radiological assessment of the site ws initiated in 1976. The entire grounds and all buildings were surveyed using surface survey instruments to detect surface contamination and radiation detectors to determine general radiation levels. Extensive surface contamination was found throughout the site. While the major contamination was found in Plant C, significant levels of contamination also were found in 16 other buildings and at 32 exterior locations. The contaminating material seemed to be normal uranium exclusively. Air samples were taken at numerous indoor locations throughout the site, but no elevated levels of radon were detected. This was as expected since normal uranium has been separated from radium and hence radon levels are very low. Several soil samples were taken from around the site. Analyses of these samples indicated extensive soil contamination, as well as suspected contamination of the river bed in the vicinity of the plant outfall. Scheduled subsurface investigation of the site, as well as of the river bed and sewer system, have not been conducted. Levels of contamination at this site are significantly above guidelines for release of the site for unrestricted use. 57 figures, 7 tables

  5. An aerial radiological survey of the Nevada Test Site

    International Nuclear Information System (INIS)

    Hendricks, T.J.; Riedhauser, S.R.

    1999-01-01

    A team from the Remote Sensing Laboratory conducted an aerial radiological survey of the US Department of Energy's Nevada Test Site including three neighboring areas during August and September 1994. The survey team measured the terrestrial gamma radiation at the Nevada Test Site to determine the levels of natural and man-made radiation. This survey included the areas covered by previous surveys conducted from 1962 through 1993. The results of the aerial survey showed a terrestrial background exposure rate that varied from less than 6 microroentgens per hour (mR/h) to 50 mR/h plus a cosmic-ray contribution that varied from 4.5 mR/h at an elevation of 900 meters (3,000 feet) to 8.5 mR/h at 2,400 meters (8,000 feet). In addition to the principal gamma-emitting, naturally occurring isotopes (potassium-40, thallium-208, bismuth-214, and actinium-228), the man-made radioactive isotopes found in this survey were cobalt-60, cesium-137, europium-152, protactinium-234m an indicator of depleted uranium, and americium-241, which are due to human actions in the survey area. Individual, site-wide plots of gross terrestrial exposure rate, man-made exposure rate, and americium-241 activity (approximating the distribution of all transuranic material) are presented. In addition, expanded plots of individual areas exhibiting these man-made contaminations are given. A comparison is made between the data from this survey and previous aerial radiological surveys of the Nevada Test Site. Some previous ground-based measurements are discussed and related to the aerial data. In regions away from man-made activity, the exposure rates inferred from the gamma-ray measurements collected during this survey agreed very well with the exposure rates inferred from previous aerial surveys

  6. Work site stress management: national survey results.

    Science.gov (United States)

    Fielding, J E

    1989-12-01

    The National Survey of Work Site Health Promotion Activities established baseline data on the frequency of nine types of health promotion activity at private work sites with more than 50 employees in the United States. Stress management activities were provided at 26.6% of work sites. Types of activities at those work sites with some stress management activity included group counseling (58.5%), individual counseling (39.3%), follow-up counseling (25.9%), special events (11.5%), providing information about stress (80.7%), providing a place to relax (64.8%), and making organizational changes to reduce employee stress (81.2%). Frequency of activities varied by industry type and by region of the country. Incidence of most types of activities did not increase as work site size increased, although the likelihood of having any of these activities did increase with work site size. Stress management activities were more likely to be present at work sites with a medical staff or health educator. An increase in output, productivity, or quality was the most frequently cited benefit (46.5%). Negative effects were reported at 2.6% of the work sites. Other health promotion activities found at the work sites surveyed included smoking cessation (61.8%), treatment and control of high blood pressure (36.7%), and weight control (34.7%). Employee Assistance Programs were responsible for stress management at 62% of the work sites with an Employee Assistance Program.

  7. Description of the Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1980-09-01

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed

  8. Description of the Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed.

  9. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  10. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  11. North Carolina Geological Survey's role in siting a low-level radioactive (LLRW) waste disposal facility in North Carolina

    International Nuclear Information System (INIS)

    Reid, J.C.; Wooten, R.M.; Farrell, K.M.

    1993-01-01

    The Southeast Compact Commission in 1986 selected North Carolina to host the Southeast's LLRW disposal facility for the next twenty years. The North Carolina Geological Survey (NCGS) for six years has played a major role in the State's efforts by contributing to legislation and administrative code, policy, technical oversight and surveillance and regulation as a member of the State's regulatory team. Future activities include recommendation of the adequacy of characterization and site performance pursuant to federal code, state general statutes and administrative code, and review of a license application. Staff must be prepared to present testimony and professional conclusions in court. The NCGS provides technical advice to the Division of Radiation Protection (DRP), the regulatory agency which will grant or deny a LLRW license. The NCGS has not participated in screening the state for potential sites to minimize bias. The LLRW Management Authority, a separate state agency siting the LLRW facility, hired a contractor to characterize potential sites and to write a license application. Organizational relationships enable the NCGS to assist the DRP in its regulatory role without conflict of interest. Disposal facilities must be sited to ensure safe disposal of LLRW. By law, the siting of a LLRW disposal facility is primarily a geological, rather than an engineering, effort. Federal and State statutes indicate a site must be licensable on its own merits. Engineered barriers cannot make a site licensable. The project is 3 years behind schedule and millions of dollars over budget. This indicates the uncertainty and complexity inherent in siting such as facility, the outcome of which cannot be predicted until site characterization is complete, the license application reviewed and the performance assessment evaluated. State geological surveys are uniquely qualified to overview siting of LLRW facilities because of technical expertise and experience in the state's geology

  12. Master schedule for CY-1980 Hanford Environmental Surveillance Routine Program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Houston, J.R.; Eddy, P.A.

    1979-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site is presented. The enviromental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in Manual Chapter 0513, and to monitor Hanford operations for compliance with applicable environmental criteria given in Manual Chapter 0524 and Washington State Water Quality Standards. Data are reported on the following topics: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurement; portable instrument surveys; and surveillance of waste disposal sites;

  13. Master schedule for CY-1983 Hanford environmental surveillance routine sampling program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.; Dirkes, R.L.

    1982-12-01

    The current schedule of data collection for the routine Hanford environmental surveillance and ground-water monitoring programs at the Hanford Site is presented. The purpose of the programs is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. Radiological monitoring data are reported for air (particulate filter and gases/vapor), Columbia River water, sanitary water, onsite pond water, foodstuffs (whole milk, leafy vegetables, fruit, wheat/alfalfa, beef, poultry/eggs), wildlife, soil and vegetation, and direct radiation. Information is also given for on site radiation control audit surveys (roadway, railway, aerial, and waste disposal sites, and the Hanford ground-water monitoring program

  14. Introduction of human papillomavirus (HPV) vaccination into national immunisation schedules in Europe: Results of the VENICE 2007 survey.

    Science.gov (United States)

    King, L A; Lévy-Bruhl, D; O'Flanagan, D; Bacci, S; Lopalco, P L; Kudjawu, Y; Salmaso, S

    2008-08-14

    The European Union Member States are simultaneously considering introducing HPV vaccination into their national immunisation schedules. The Vaccine European New Integrated Collaboration Effort (VENICE) project aims to develop a collaborative European vaccination network. A survey was undertaken to describe the decision status and the decision-making process regarding the potential introduction of human papillomavirus (HPV) vaccination in to their national immunisation schedules. A web-based questionnaire was developed and completed online in 2007 by 28 countries participating in VENICE. As of 31 October 2007,five countries had decided to introduce HPV vaccination into the national immunisation schedule, while another seven had started the decision-making process with a recommendation favouring introduction. Varying target populations were selected by the five countries which had introduced the vaccination. Half of the surveyed countries had undertaken at least one ad hoc study to support the decision-making process. According to an update of the decision-status from January 2008, the number of countries which had made a decision or recommendation changed to 10 and 5 respectively. This survey demonstrates the rapidly evolving nature of HPV vaccine introduction in Europe and the existence of expertise and experience among EU Member States. The VENICE network is capable of following this process and supporting countries in making vaccine introduction decisions. A VENICE collaborative web-space is being developed as a European resource for the decision-making process for vaccine introduction.

  15. Site study plan for cultural resources, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Cultural Resources Site Study Plan describes a field program to identify and evaluate the archaeological, historical, and Native American Indian resources of the site on local and regional perspectives; monitor and manage discovered cultural resources; and establish a worker education program. The archaeological field program consists of three pedestrian surveys: Survey 1 includes two EDBH seismic survey lines and the area within the exploratory shaft facility (ESF); Survey 2 includes the remainder of the site plus a 1/4 to 3/4-mi border area; and Survey 3 includes an assortment of offsite areas. The historical studies will identify and evaluate known and discovered historical sites and structures and the Native American Indian will identify and evaluate cultural and religious concerns expressed by Indian tribal groups. Prehistoric and historic sites will be evaluated to determine if they meet eligibility criteria for listing on the National Register of Historic Places. This site study plan describes the need for each study; its design and design rationale; analysis, management, and use of data; schedule of field activities; organization of field personnel and sample management; and quality assurance requirements. The cultural resource studies will provide data for satisfying the Programmatic Agreement, engineering design needs, and SRP requirements for permits and approvals, and for minimizing effects to any cultural properties discovered during site characterization. 75 refs., 10 figs., 2 tabs

  16. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  17. 2010 Ecological Survey of the Pacific Northwest National Laboratory Site

    Energy Technology Data Exchange (ETDEWEB)

    Chamness, Michele A.; Perry, Christopher; Downs, Janelle L.; Powell, Sylvia D.

    2011-02-16

    The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL Site comply with applicable laws, policies, and DOE orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL Site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL Site is described in Larson and Downs (2009). There are currently two facilities on the PNNL Site: the William R. Wiley Environmental Molecular Sciences Laboratory (EMSL), and the recently completed Physical Sciences Facility (PSF). This report describes the results of the annual survey of the biological resources found on the undeveloped portions of the PNNL Site in 2010. A brief description of the methods PNNL ecologists used to conduct the surveys and the results of the surveys are presented. Actions taken to fully delineate noxious weed populations discovered in 2009 and efforts in 2010 to control those weeds also are described. Appendix A provides a list of plant and

  18. Environmental monitoring master sampling schedule: January--December 1989

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1989-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1989 for the Surface and Ground-Water Environmental Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. This schedule includes routine ground-water sampling performed by PNL for Westinghouse Hanford Company, but does not include samples that may be collected in 1989 to support special studies or special contractor projects, or for quality control. The sampling schedule for Site-wide chemical monitoring is not included here, because it varies each quarter as needed, based on past results and operating needs. This schedule does not include Resource Conservation and Recovery Act ground-water sampling performed by PNL for Hanford Site contractors, nor does it include sampling that may be done by other DOE Hanford contractors

  19. Survey Procedures Manual for the Environmental Survey and Site Assessment Program (ESSAP). Revision 10

    International Nuclear Information System (INIS)

    2000-01-01

    The Environmental Survey and Site Assessment Program (ESSAP) of the Oak Ridge Institute for Science and Education (ORISE) conducts radiological survey activities under a contract with the U. S. Department of Energy (DOE) and for the U.S. Nuclear Regulatory Commission (NRC). ORISE and its programs are operated by Oak Ridge Associated Universities (ORAU) through a contract with DOE. The purpose of this Procedures Manual is to provide a standardized set of procedures that document activities of the program in an auditable manner. These procedures are applicable to both DOE and NRC operations. Procedures presented in this manual are limited to those associated with site survey activities

  20. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  1. Multi-method Near-surface Geophysical Surveys for Site Response and Earthquake Damage Assessments at School Sites in Washington, USA

    Science.gov (United States)

    Cakir, R.; Walsh, T. J.; Norman, D. K.

    2017-12-01

    We, Washington Geological Survey (WGS), have been performing multi-method near surface geophysical surveys to help assess potential earthquake damage at public schools in Washington. We have been conducting active and passive seismic surveys, and estimating Shear-wave velocity (Vs) profiles, then determining the NEHRP soil classifications based on Vs30m values at school sites in Washington. The survey methods we have used: 1D and 2D MASW and MAM, P- and S-wave refraction, horizontal-to-vertical spectral ratio (H/V), and 2ST-SPAC to measure Vs and Vp at shallow (0-70m) and greater depths at the sites. We have also run Ground Penetrating Radar (GPR) surveys at the sites to check possible horizontal subsurface variations along and between the seismic survey lines and the actual locations of the school buildings. The seismic survey results were then used to calculate Vs30m for determining the NEHRP soil classifications at school sites, thus soil amplification effects on the ground motions. Resulting shear-wave velocity profiles generated from these studies can also be used for site response and liquefaction potential studies, as well as for improvement efforts of the national Vs30m database, essential information for ShakeMap and ground motion modeling efforts in Washington and Pacific Northwest. To estimate casualties, nonstructural, and structural losses caused by the potential earthquakes in the region, we used these seismic site characterization results associated with structural engineering evaluations based on ASCE41 or FEMA 154 (Rapid Visual Screening) as inputs in FEMA Hazus-Advanced Engineering Building Module (AEBM) analysis. Compelling example surveys will be presented for the school sites in western and eastern Washington.

  2. Utility survey on nuclear power plant siting and nuclear energy centers

    International Nuclear Information System (INIS)

    Cope, D.F.; Bauman, H.F.

    1977-01-01

    Most of the large U.S. utilities were surveyed by telephone and mail on questions concerning nuclear power plant siting and nuclear energy centers (NECs). The main purpose of the survey was for guidance of ERDA's NEC program. The questions covered the following topics: availability of sites; impact of environmental and other restraints; plans for development of multi-unit sites; interest in NEC development; interest in including fuel-cycle facilities in NECs; and opinions on the roles desired for the state and Federal governments in power plant siting. The main conclusion of the survey was that, while many utilities were considering multiple-unit sites of 2 to 5 units, none were planning larger energy centers at the present time. However, several expressed interest in NECs as a long-range future development

  3. Peer-to-peer Cooperative Scheduling Architecture for National Grid Infrastructure

    Science.gov (United States)

    Matyska, Ludek; Ruda, Miroslav; Toth, Simon

    For some ten years, the Czech National Grid Infrastructure MetaCentrum uses a single central PBSPro installation to schedule jobs across the country. This centralized approach keeps a full track about all the clusters, providing support for jobs spanning several sites, implementation for the fair-share policy and better overall control of the grid environment. Despite a steady progress in the increased stability and resilience to intermittent very short network failures, growing number of sites and processors makes this architecture, with a single point of failure and scalability limits, obsolete. As a result, a new scheduling architecture is proposed, which relies on higher autonomy of clusters. It is based on a peer to peer network of semi-independent schedulers for each site or even cluster. Each scheduler accepts jobs for the whole infrastructure, cooperating with other schedulers on implementation of global policies like central job accounting, fair-share, or submission of jobs across several sites. The scheduling system is integrated with the Magrathea system to support scheduling of virtual clusters, including the setup of their internal network, again eventually spanning several sites. On the other hand, each scheduler is local to one of several clusters and is able to directly control and submit jobs to them even if the connection of other scheduling peers is lost. In parallel to the change of the overall architecture, the scheduling system itself is being replaced. Instead of PBSPro, chosen originally for its declared support of large scale distributed environment, the new scheduling architecture is based on the open-source Torque system. The implementation and support for the most desired properties in PBSPro and Torque are discussed and the necessary modifications to Torque to support the MetaCentrum scheduling architecture are presented, too.

  4. Environmental monitoring master sampling schedule, January--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1990-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1990 for the Environment Surveillance and Ground-Water Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This schedule includes ground-water sampling performed by PNL for environmental surveillance of the Hanford Site.

  5. Progress of site survey for large solar telescopes in western China

    Science.gov (United States)

    Liu, Yu; Song, Tengfei; Zhang, Xuefei; Liu, Shunqing; Zhao, Mingyu; Tian, Zhanjun; Miao, Yuhu; Li, Hongbo; Huang, Jing; Su, Baoyu; Lu, Yongyin; Li, Xiaobo; Song, Qiwu

    Excellent sites are necessary for developing and installing ground-based large telescopes. For very-high-resolution solar observations, it had been unclear whether there exist good candidate sites in the west areas in China, including the Tibetan Plateau and the Pamirs Plateau. The project of solar site survey for the next-generation large solar telescopes, i.e., the Chinese Giant Solar Telescope (CGST) and the large coronagraph, has been launched since 2011. Based on the close collaboration among Chinese solar society and the scientists from NSO, HAO and other institutes, we have successfully developed the standard instruments for solar site survey and applied them to more than 50 different sites distributed in Xinjiang, Tibet, Qinghai, Sichuan, Yunnan and Ningxia provinces. We have built two long-term monitoring sites in Tibet and the large Shangri-La to take systematic site data. Clear evidence, including the key parameters of seeing factor, sky brightness and water vapor content, has indicated that a few potential sites in the large Tibetan areas should obtain the excellent astronomical conditions for our purpose to develop CGST and large coronagraph. We introduce the fresh site survey results in this report.

  6. Construction and validation of the South African version of the Fear Survey Schedule for Children: an exploratory factor analysis.

    Science.gov (United States)

    Burkhardt, Käthe; Loxton, Helene; Kagee, Ashraf; Ollendick, Thomas H

    2012-09-01

    The Fear Survey Schedule for Children-Revised (Ollendick, 1983) is an 80-item self-report instrument that has been used internationally to asses the number of fears and general level of fearfulness among children. Despite its widespread use, this instrument has not been adapted to the South African context. The present study addressed this gap by means of a 2-phase investigation aimed at developing a South African version of the instrument. In Phase 1, semistructured interviews were conducted with 40 children (7 to 13 years of age). Qualitative data obtained from these interviews were used to construct additional items for inclusion in the South African Fear Survey Schedule for Children-Revised. The modified scale, consisting of 97 items, was then administered to a sample of 646 children between the ages of 7 and 13 years. Further psychometric considerations resulted in the final version of the scale consisting of 74 items with high internal consistency (α=.97). The factor structure was explored by means of principal component analysis with varimax rotation and a 5-factor solution was found to provide the best conceptual fit. The factors identified were as follows: Fear of Death and Danger; Fear of the Unknown; Fear of Small Animals and Minor Threats to Self; Large Animal Fears; and Situational Fears. Differences between the South African version and the original Fear Survey Schedule for Children-Revised are noted and implications for the study of fear in South Africa and other countries are discussed. Copyright © 2012. Published by Elsevier Ltd.

  7. The robust schedule - A link to improved workflow

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2012-01-01

    -down the contractors, and force them to rigorously adhere to the initial schedule. If delayed the work-pace or manpower has to be increased to observe the schedule. In attempt to improve productivity three independent site-mangers have been interviewed about time-scheduling. Their experiences and opinions have been...... analyzed and weaknesses in existing time scheduling have been found. The findings showed a negative side effect of keeping the schedule to tight. A too tight schedule is inflexible and cannot absorb variability in production. Flexibility is necessary because of the contractors interacting and dependable....... The result is a chaotic, complex and uncontrolled construction site. Furthermore, strict time limits entail the workflow to be optimized under non-optimal conditions. Even though productivity seems to be increasing, productivity per man-hour is decreasing resulting in increased cost. To increase productivity...

  8. Examining the Cultural Validity of Fear Survey Schedule for Children: The Contemporary Fears of Turkish Children and Adolescents

    Science.gov (United States)

    Serim-Yildiz, Begum; Erdur-Baker, Ozgur

    2013-01-01

    The authors examined the cultural validity of Fear Survey Schedule for Children (FSSC-AM) developed by J. J. Burnham (2005) with Turkish children. The relationships between demographic variables and the level of fear were also tested. Three independent data sets were used. The first data set comprised 676 participants (321 women and 355 men) and…

  9. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2011-01-21

    This document contains the calendar year 2011 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and the Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2011, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2011.

  10. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2007-01-31

    This document contains the calendar year 2007 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2007 in which case the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2007.

  11. Waste Isolation Pilot Plant (WIPP) site gravity survey and interpretation

    International Nuclear Information System (INIS)

    Barrows, L.J.; Fett, J.D.

    1983-04-01

    A portion of the WIPP site has been extensively surveyed with high-precision gravity. The main survey (in T22S, R31E) covered a rectangular area 2 by 4-1/3 mi encompassing all of WIPP site Zone II and part of the disturbed zone to the north of the site. Stations were at 293-ft intervals along 13 north-south lines 880 ft apart. The data are considered accurate to within a few hundredths of a milligal. Long-wavelength gravity anomalies correlate well with seismic time structures on horizons below the Castile Formation. Both the gravity anomalies and the seismic time structures are interpreted as resulting from related density and velocity variations within the Ochoan Series. Shorter wavelength negative gravity anomalies are interpreted as resulting from bulk density alteration in the vicinity of karst conduits. The WIPP gravity survey was unable to resolve low-amplitude, long-wavelength anomalies that should result from the geologic structures within the disturbed zone. It did indicate the degree and character of karst development within the surveyed area

  12. Report on the Survey on Regulation of Site Selection and Preparation

    International Nuclear Information System (INIS)

    Webster, Philip

    2010-01-01

    At its first meeting in May 2008, the Working Group discussed a task to 'Prepare a report reviewing the various practices used by regulators in the regulation of nuclear power plant siting. The report should consider regulator practices on sites where a mixture of activities are taking place (e.g. operating units, new construction, decommissioning, etc) including organization of the regulators organisation, methods, systems, etc.'. Following discussion, the Working Group assigned an Action 1-5 to 'develop a survey on the regulation of nuclear sites including seismicity issues, security issues, multi-units aspects and regulator practices on sites where a mixture of activities are taking place (e.g. operating units, new construction, decommissioning, etc.)'. The Survey was prepared and issued by the NEA in July 2008 with a request to the member states to provide their responses by the next meeting of the Working Group in October 2008. In addition to addressing the specific topics actioned by the Working Group, the Survey also investigated the broader context of siting, in order to address the Mandate that had been approved by the CNRA. The questions in the survey therefore covered the topics of site evaluation, site selection, regulatory approval, site preparation and regulatory oversight. A topic of particular interest was to what extent IAEA guidance on site evaluation was followed. The survey considered the possibility that a body other than the safety regulator may approve the choice of site or permit the applicant to start to prepare it. The survey also investigated the existence of formal requirements and informal expectations, recognizing that these both form part of the regulatory tool-kit. Responses were received from all twelve member states that were then members of the Working Group. The responses were reviewed at the second meeting of the Working Group in October 2008. In general, it could be stated that new reactors are licensed in

  13. Toward an Autonomous Telescope Network: the TBT Scheduler

    Science.gov (United States)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  14. Schedule Risk Analysis Of Southern Mainway Construction In Jember Regency

    Science.gov (United States)

    Susilo, K.; Wiguna, I. P. A.; Adi, T. J. W.

    2017-11-01

    In Jember Regency, it has been built Southern Cross Road (JLS) as part of regional project. On the implementation of previous construction, there were still some events which gave negative impact to the project. The purpose of this research is to analyze risk and its effect on schedule at the construction phase of JLS at Jember Regency. Risk identification process is carried out by site survey, literature studies and supporting data. The use of Probability and Impact Matrix were aimed to obtain the level of risk. Based on the analysis, it was obtained six highest risk that could affecting schedule, such as difficult access locations, heavy rains, increases of material price, broken road pavement work, change order, and work accident. Risk responses were proposed by applying agreement to guarantee stock and price of materials, prioritized drainage, and constructing bridge to solve difficult access. An intense coordination in the site, routine checks of quality, manufacturing of retailing walls were also needed to reduce possibility of distruption to pavement work. To avoid work accident, it is needed to socialize about harsh terrain condition, mutual allertness among supervisor, worker and the others, and also all personals must comply with savety rules.

  15. Archaeological survey of the McGee Ranch vicinity, Hanford Site, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Gard, H.A.; Poet, R.M.

    1992-09-01

    In response to a request for a cultural resources review from Westinghouse Hanford Company for the Action Plan for Characterization of McGee Ranch Soil, Pacific Northwest Laboratory's Hanford Cultural Resources Laboratory (HCRL) conducted an archaeological survey of the McGee Ranch vicinity, located in the northwest portion of the Hanford Site. Staff members covered 8.4 km{sup 2} and recorded 42 cultural resources; 22 sites, and 20 isolated artifacts. Only 2 sites and 3 isolates were attributed to a prehistoric Native American occupation. The historic sites date from the turn of the century to the 1940s and are representative of the settlement patterns that occurred throughout the Columbia Basin. In addition to an archaeological pedestrian survey of the project area, we conducted literature and records searches and examined available aerial photographs. Records kept at HCRL were reviewed to determine if any archaeological survey had been conducted previously within the project area. Although no survey had been conducted, portions of the area adjacent to project boundaries were surveyed in 1988 and 1990. During those surveys, historic and prehistoric cultural resources were observed, increasing the possibility that similar land usage had taken place within the current project boundaries. Literature searches established a general historical sequence for this area. Aerial photographs alerted researchers to homesteads and linear features, such as roads and irrigation ditches, that might not be apparent from ground level.

  16. Archaeological survey of the McGee Ranch vicinity, Hanford Site, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Gard, H.A.; Poet, R.M.

    1992-09-01

    In response to a request for a cultural resources review from Westinghouse Hanford Company for the Action Plan for Characterization of McGee Ranch Soil, Pacific Northwest Laboratory`s Hanford Cultural Resources Laboratory (HCRL) conducted an archaeological survey of the McGee Ranch vicinity, located in the northwest portion of the Hanford Site. Staff members covered 8.4 km{sup 2} and recorded 42 cultural resources; 22 sites, and 20 isolated artifacts. Only 2 sites and 3 isolates were attributed to a prehistoric Native American occupation. The historic sites date from the turn of the century to the 1940s and are representative of the settlement patterns that occurred throughout the Columbia Basin. In addition to an archaeological pedestrian survey of the project area, we conducted literature and records searches and examined available aerial photographs. Records kept at HCRL were reviewed to determine if any archaeological survey had been conducted previously within the project area. Although no survey had been conducted, portions of the area adjacent to project boundaries were surveyed in 1988 and 1990. During those surveys, historic and prehistoric cultural resources were observed, increasing the possibility that similar land usage had taken place within the current project boundaries. Literature searches established a general historical sequence for this area. Aerial photographs alerted researchers to homesteads and linear features, such as roads and irrigation ditches, that might not be apparent from ground level.

  17. Physician satisfaction with a multi-platform digital scheduling system.

    Directory of Open Access Journals (Sweden)

    Rodrigo Octávio Deliberato

    Full Text Available Physician shift schedules are regularly created manually, using paper or a shared online spreadsheet. Mistakes are not unusual, leading to last minute scrambles to cover a shift. We developed a web-based shift scheduling system and a mobile application tool to facilitate both the monthly scheduling and shift exchanges between physicians. The primary objective was to compare physician satisfaction before and after the mobile application implementation.Over a 9-month period, three surveys, using the 4-point Likert type scale were performed to assess the physician satisfaction. The first survey was conducted three months prior mobile application release, a second survey three months after implementation and the last survey six months after.51 (77% of the physicians answered the baseline survey. Of those, 32 (63% were males with a mean age of 37.8 ± 5.5 years. Prior to the mobile application implementation, 36 (70% of the responders were using more than one method to carry out shift exchanges and only 20 (40% were using the official department report sheet to document shift exchanges. The second and third survey were answered by 48 (73% physicians. Forty-eight (98% of them found the mobile application easy or very easy to install and 47 (96% did not want to go back to the previous method. Regarding physician satisfaction, at baseline 37% of the physicians were unsatisfied or very unsatisfied with shift scheduling. After the mobile application was implementation, only 4% reported being unsatisfied (OR = 0.11, p < 0.001. The satisfaction level improved from 63% to 96% between the first and the last survey. Satisfaction levels significantly increased between the three time points (OR = 13.33, p < 0.001.Our web and mobile phone-based scheduling system resulted in better physician satisfaction.

  18. Formerly utilized MED/AEC Sites Remedial Action Program. Radiological survey of the Pennsylvania Railroad Landfill Site, Burrell Township, Pennsylvnia. Final Report

    International Nuclear Information System (INIS)

    1979-02-01

    A radiological survey was conducted at the Pennsylvania Railroad Landfill Site in Burrell Township, Pennsylvania. In 1956 and 1957, approximately 11,600 tons of radioactive material was dumped at this site and was apparently scattered over an area of loss than 10 acres. The survey included measurement of the following: external gamma radiation at 1 m above the surface and at the surface throughout the site; beta--gamma dose rates at 1 cm from the surface throughout the site; concentrations of 226 Ra and 238 U in surface and subsurface soil on the site; concentrations of 210 Pb, 226 Ra, 230 Th, and 238 U in subsurface water on the site and in surface water on and near the site; and the extent of atmospheric transport of 222 Rn and progeny from the site. The general location of the residues transported to the site, except possibly small, scattered quantities of materials, was determined from the survey. In some areas on the site, beta--gamma dose rates of 1 cm from the surface were above pertinent guidelines.Analyses of sediment from water samples taken from drainage areas near the site indicate that some radioactive material is being carried from the site by surface run-off. Results of this survey indicate that there is no significant atmospheric transport of 222 Rn from the site

  19. The current state of introduction of HPV vaccination into national immunisation schedules in Europe: results of the VENICE 2008 survey.

    Science.gov (United States)

    Lévy-Bruhl, D; Bousquet, V; King, L A; O'Flanagan, D; Bacci, S; Lopalco, P L; Salmaso, S

    2009-10-01

    Three surveys have been undertaken in European Union (EU) member states since January 2007, within the European Commission funded Vaccine European New Integrated Collaboration Effort (VENICE) project, to monitor the decision status regarding the introduction of human papillomavirus (HPV) vaccination into national immunisation schedules. A web-based questionnaire was developed and completed online by the 28 countries participating in VENICE. According to the last update (31st December 2008), 15 countries have decided to introduce HPV vaccination into their national immunisation schedule, while another six have started the decision-making process with a recommendation favouring introduction. Varying target populations have been selected by the countries which have introduced vaccination. The number of countries which have made a decision or recommendation has increased from 12 to 21 between October 2007 and December 2008. This survey demonstrates the rapidly evolving nature of HPV vaccine introduction in Europe. A further update should be available in the second half of 2009.

  20. Flexible Scheduling May Have a Positive Impact on School Library Circulation. A Review of: Gavigan, K., Pribesh, S., & Dickinson, G. (2010. Fixed or flexible schedule? Schedule impacts and school library circulation. Library and Information Science Research, 32(2, 131-37.

    Directory of Open Access Journals (Sweden)

    Ann Medaille

    2011-03-01

    Full Text Available Objective – To determine whether a significant, positive relationship exists between flexible scheduling in elementary school library media centers and per-pupil circulation statistics.Design – Online survey.Setting – Library media centers in public elementary schools in two states of the United States.Subjects – A total of 88 elementary school library media specialists completed the survey.Methods – A 22-question online survey was created using Inquisite software. A link to the survey was sent via e-mail to a 600-person random sample of public school library media specialists whose names were drawn from the memberships of the North Carolina School Library Media Association and the Virginia Educational Media Association, with combined memberships totalling approximately 2,000. A random sample of 600 was chosen to provide a 95% confidence level with a confidence interval of plus or minus three points. The survey included questions about school schedules (flexible, partially flexible, or fixed, collection size, circulation statistics, total student enrolment, school type (elementary, middle, or high, school location (urban, rural, or suburban, percentage of students eligible for free and reduced price lunch, numbers of full-time professional library media specialists employed at the school, access procedures, and library closure information. The survey response rate was 29.3% (176 respondents. Because fixed versus flexible scheduling is an issue that primarily affects elementary schools, the authors further narrowed their subject pool to 88 elementary school respondents. Data were analyzed using SPSS 16.0 statistical software. Correlation analysis, including the analysis of covariance (ANCOVA, was used to compare differences in the three scheduling types and to control for other variables (such as location, socioeconomic status, collection size, staffing, days closed, and others that may affect circulation.Main Results – Of the 88

  1. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  2. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  3. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2006-01-27

    This document contains the calendar year 2006 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2006 in which case the anticipated year for collection is provided. The project document package (PDP) for Surface Environmental Surveillance contains the milestone control log for the issuing of CY06 Environmental Surveillance Master Sampling Schedule WBS 4.2.3.21.3.03, milestone: RL00430306 (4830106-12).

  4. Children's Fears: A Pre-9/11 and Post-9/11 Comparison Using the American Fear Survey Schedule for Children

    Science.gov (United States)

    Burnham, Joy J.

    2007-01-01

    Children are influenced by the salient events surrounding them (e.g., 9/11 terrorist attacks, Hurricane Katrina, massacre at Virginia Tech). In this study, the author examined fears of children and adolescents in Grades 2-12 in a pre-and post-September 11, 2001, comparison using the American Fear Survey Schedule for Children (FSSC-AM; J. J.…

  5. The value of DCIP geophysical surveys for contaminated site investigations

    DEFF Research Database (Denmark)

    Balbarini, Nicola; Rønde, Vinni Kampman; Maurya, Pradip Kumar

    an old factory site by combining traditional geological, hydrological, and contaminant concentration data with DCIP surveys. The plume consisted of xenobiotic organic compounds and inorganics. The study assesses benefits and limitations of DCIP geophysics for contaminated site investigations. A 3D......Geophysical methods are increasingly being used in contaminant hydrogeology to map lithology, hydraulic properties, and contaminant plumes with a high ionic strength. Advances in the Direct Current resistivity and Induced Polarization (DCIP) method allow the collection of high resolution three...... water and below the streambed. Surface DCIP surveys supported the characterization of the spatial variability in geology, hydraulic conductivity and contaminant concentration. Though DCIP data interpretation required additional borehole data, the DCIP survey reduced the number of boreholes required...

  6. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  7. Surgical scheduling: a lean approach to process improvement.

    Science.gov (United States)

    Simon, Ross William; Canacari, Elena G

    2014-01-01

    A large teaching hospital in the northeast United States had an inefficient, paper-based process for scheduling orthopedic surgery that caused delays and contributed to site/side discrepancies. The hospital's leaders formed a team with the goals of developing a safe, effective, patient-centered, timely, efficient, and accurate orthopedic scheduling process; smoothing the schedule so that block time was allocated more evenly; and ensuring correct site/side. Under the resulting process, real-time patient information is entered into a database during the patient's preoperative visit in the surgeon's office. The team found the new process reduced the occurrence of site/side discrepancies to zero, reduced instances of changing the sequence of orthopedic procedures by 70%, and increased patient satisfaction. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  8. Preliminary Geological Survey on the Proposed Sites for the New Research Reactor

    International Nuclear Information System (INIS)

    Lim, In Cheol; Ha, J. J.; Oh, K. B.

    2010-12-01

    · Performing the preliminary geological survey on the proposed sites for the new research reactor through the technical service · Ordering a technical service from The Geological Society of Korea · Contents of the geological survey - Confirmation of active fault - Confirmation of a large-scale fracture zone or weak zone - Confirmation of inappropriate items related to the underground water - Confirmation of historical seismicity and instrumental earthquakes data · Synthesized analysis and holding a report meeting · Results of the geological survey - Confirmation of the geological characteristics of the sites and drawing the requirements for the precise geological survey in the future

  9. Application of microearthquake surveys in nuclear power plant siting

    International Nuclear Information System (INIS)

    1985-06-01

    Earthquakes of magnitude less than 3 are generally referred to as microearthquakes. After an overview of the use of microearthquake survey in decisions related to the siting of nuclear power plants, the main aspects of a microearthquake survey network are discussed. The use of microearthquake surveys in investigating problems related to near-field (floating) earthquakes is also discussed. The discussion is centered on the practical application of such a survey leading from objectives and limitations over to planning, instrumentation, operation, maintenance, processing of the data, and interpretation and reporting of the results. An appendix entitled Earthquake Magnitude gives useful background information for definitions of different types of magnitude and their calculation using the records from microearthquake surveys

  10. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  11. Development of remote controller for an EMI test receiver in site survey

    International Nuclear Information System (INIS)

    Cha, K. H.; Hwang, I. G.; Lee, D. Y.; Lee, K. Y.; Park, J. K.

    2000-01-01

    EMI assessment, which is based on the Site survey(the measurement of EMI noise) in an operating plant, can be considered for system design. Our Site survey is being planned to utilize the ESI7 model, to be manufactured as the EMI test receiver by Rodge-Schwaltz GmbH. But the ESI7 is often manipulated by manual if a Site survey is continued for some days in nuclear power plant. The problem can be resolved if a remote controller is implemented for the ESI7 and it controls the ESI7. The Remote Controller has its functions for supporting the ESI7 manual tasks, including storing mass SCAN data onto external PC memory (hard-disk), controlling ESI7, and analyzing the stored SCAN data. These functions have been implemented in 'G' programming of LabVIEW software under a notebook PC with PCMCIA-GPIB card. The Remote Controller prototype will be applied to store the real EMI measurements in the coming Site survey and analyze the data after integrated tests and their evaluation

  12. Seismic refraction survey of the ANS preferred site

    Energy Technology Data Exchange (ETDEWEB)

    Davis, R.K. (Automated Sciences Group, Inc., Oak Ridge, TN (United States)); Hopkins, R.A. (Marrich, Inc., Knoxville, TN (United States)); Doll, W.E. (Oak Ridge National Lab., TN (United States))

    1992-02-01

    Between September 19, 1991 and October 8, 1991 personnel from Martin Marietta Energy Systems, Inc. (Energy Systems), Automated Sciences Group, Inc., and Marrich, Inc. performed a seismic refraction survey at the Advanced Neutron Source (ANS) preferred site. The purpose of this survey was to provide estimates of top-of-rock topography, based on seismic velocities, and to delineate variations in rock and soil velocities. Forty-four seismic refraction spreads were shot to determine top-of-rock depths at 42 locations. Nine of the seismic spreads were shot with long offsets to provide 216 top-of-rock depths for 4 seismic refraction profiles. The refraction spread locations were based on the grid for the ANS Phase I drilling program. Interpretation of the seismic refraction data supports the assumption that the top-of-rock surface generally follows the local topography. The shallow top-of-rock interface interpreted from the seismic refraction data is also supported by limited drill information at the site. Some zones of anomalous data are present that could be the result of locally variable weathering, a localized variation in shale content, or depth to top-of-rock greater than the site norm.

  13. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  14. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  15. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  16. 2010 Dry and 2009 - 2010 Wet Season Branchiopod Survey Report, Site 300

    Energy Technology Data Exchange (ETDEWEB)

    Dexter, W

    2011-03-14

    Lawrence Livermore National Laboratory (LLNL) requested that Condor Country Consulting, Inc. (CCCI) perform wet season surveys and manage the dry season sampling for listed branchiopods in two ponded locations within the Site 300 Experimental Test Site. Site 300 is located in Alameda and San Joaquin Counties, located between the Cities of Livermore and Tracy. The two pool locations have been identified for possible amphibian enhancement activities in support of the Compensation Plan for impacts tied to the Building 850 soil clean-up project. The Building 850 project design resulted in formal consultation with the U.S. Fish and Wildlife Service (USFWS) as an amendment (File 81420-2009-F-0235) to the site-wide Biological Opinion (BO) (File 1-1-02-F-0062) in the spring of 2009 and requires mitigation for the California tiger salamander (AMCA, Ambystoma californiense) and California red-legged frog (CRLF, Rana draytonii) habitat loss. Both pools contain breeding AMCA, but do not produce metamorphs due to limited hydroperiod. The pool to the southeast (Pool BC-FS-2) is the preferred site for amphibian enhancement activities, and the wetland to northwest (Pool OA-FS-1) is the alternate location for enhancement. However, prior to enhancement, LLNL has been directed by USFWS (BO Conservation Measure 17 iii) to 'conduct USFWS protocol-level branchiopod surveys to determine whether listed brachiopod species are present within the compensation area.' CCCI conducted surveys for listed branchiopods in the 2009-2010 wet season to determine the presence of federally-listed branchiopods at the two pools (previous surveys with negative findings were performed by CCCI in 2001-2002 and 2002-2003 onsite). Surveys were conducted to partially satisfy the survey requirements of the USFWS 'Interim Survey Guidelines to Permittees for Recovery Permits under Section 10(a)(1)(A) of the Endangered Species Act for the Listed Vernal Pool Branchiopods' ('Guidelines, USFWS

  17. Off-site consequences of radiological accidents: methods, costs and schedules for decontamination

    International Nuclear Information System (INIS)

    Tawil, J.J.; Bold, F.C.; Harrer, B.J.; Currie, J.W.

    1985-08-01

    This report documents a data base and a computer program for conducting a decontamination analysis of a large, radiologically contaminated area. The data base, which was compiled largely through interviews with knowledgeable persons both in the public and private sectors, consists of the costs, physical inputs, rates and contaminant removal efficiencies of a large number of decontamination procedures. The computer program utilizes this data base along with information specific to the contaminated site to provide detailed information that includes the least costly method for effectively decontaminating each surface at the site, various types of property losses associated with the contamination, the time at which each subarea within the site should be decontaminated to minimize these property losses, the quantity of various types of labor and equipment necessary to complete the decontamination, dose to radiation workers, the costs for surveying and monitoring activities, and the disposal costs associated with radiological waste generated during cleanup. The program and data base are demonstrated with a decontamination analysis of a hypothetical site. 39 refs., 24 figs., 155 tabs

  18. Off-site consequences of radiological accidents: methods, costs and schedules for decontamination

    Energy Technology Data Exchange (ETDEWEB)

    Tawil, J.J.; Bold, F.C.; Harrer, B.J.; Currie, J.W.

    1985-08-01

    This report documents a data base and a computer program for conducting a decontamination analysis of a large, radiologically contaminated area. The data base, which was compiled largely through interviews with knowledgeable persons both in the public and private sectors, consists of the costs, physical inputs, rates and contaminant removal efficiencies of a large number of decontamination procedures. The computer program utilizes this data base along with information specific to the contaminated site to provide detailed information that includes the least costly method for effectively decontaminating each surface at the site, various types of property losses associated with the contamination, the time at which each subarea within the site should be decontaminated to minimize these property losses, the quantity of various types of labor and equipment necessary to complete the decontamination, dose to radiation workers, the costs for surveying and monitoring activities, and the disposal costs associated with radiological waste generated during cleanup. The program and data base are demonstrated with a decontamination analysis of a hypothetical site. 39 refs., 24 figs., 155 tabs.

  19. Global Land Survey Impervious Mapping Project Web Site

    Science.gov (United States)

    DeColstoun, Eric Brown; Phillips, Jacqueline

    2014-01-01

    The Global Land Survey Impervious Mapping Project (GLS-IMP) aims to produce the first global maps of impervious cover at the 30m spatial resolution of Landsat. The project uses Global Land Survey (GLS) Landsat data as its base but incorporates training data generated from very high resolution commercial satellite data and using a Hierarchical segmentation program called Hseg. The web site contains general project information, a high level description of the science, examples of input and output data, as well as links to other relevant projects.

  20. Site selection

    International Nuclear Information System (INIS)

    Olsen, C.W.

    1983-07-01

    The conditions and criteria for selecting a site for a nuclear weapons test at the Nevada Test Site are summarized. Factors considered are: (1) scheduling of drill rigs, (2) scheduling of site preparation (dirt work, auger hole, surface casing, cementing), (3) schedule of event (when are drill hole data needed), (4) depth range of proposed W.P., (5) geologic structure (faults, Pz contact, etc.), (6) stratigraphy (alluvium, location of Grouse Canyon Tuff, etc.), (7) material properties (particularly montmorillonite and CO 2 content), (8) water table depth, (9) potential drilling problems (caving), (10) adjacent collapse craters and chimneys, (11) adjacent expended but uncollapsed sites, (12) adjacent post-shot or other small diameter holes, (13) adjacent stockpile emplacement holes, (14) adjacent planned events (including LANL), (15) projected needs of Test Program for various DOB's and operational separations, and (16) optimal use of NTS real estate

  1. Nuclear Energy Center Site Survey, 1975. Executive summary

    International Nuclear Information System (INIS)

    1976-01-01

    The Nuclear Energy Center Site Survey is a study of a potential alternative siting approach for nuclear power and fuel-cycle facilities, an approach that would cluster sizable groups of such facilities on a relatively small number of sites. The largest aggregation of reactors on a single site being planned today is four, and this quad is assumed (for comparative study purposes) to be the typical dispersed site by the year 2000. Three basic types of nuclear energy centers are considered: power-plant centers, consisting of 10 to 40 nuclear electric generating units of 1200-megawatt electric capacity each; fuel-cycle centers, consisting of fuel reprocessing plants, mixed-oxide fuel fabrication facilities, and radioactive waste management facilities; and combined centers, containing both power plants and fuel-cycle facilities. The results of the general site-location screening efforts are shown on a United States map that shows the locations of large areas identified as likely to contain suitable candidate sites for power NECs, on the basis of four coarse screening criteria: water resources, seismic activity, population density, and statutory excluded lands

  2. An automated radiological survey method for performing site remediation and decommissioning

    International Nuclear Information System (INIS)

    Handy, R.G.; Bolch, W.E.; Harder, G.F.; Tolaymat, T.M.

    1994-01-01

    A portable, computer-based method of performing environmental monitoring and assessment for site remediation and decommissioning has been developed. The integrated system has been developed to provide for survey time reductions and real-time data analysis. The technique utilizes a notebook 486 computer with the necessary hardware and software components that makes it possible to be used in an almost unlimited number of environmental monitoring and assessment scenarios. The results from a pilot, open-quotes hide-and-seekclose quotes gamma survey and an actual alpha decontamination survey were elucidated. It was found that a open-quotes hide-and-seekclose quotes survey could come up with timely and accurate conclusions about the position of the source. The use of the automated system in a Th-232 alpha survey resulted in a reduction in the standard time necessary to do a radiological survey. In addition, the ability to analyze the data on-site allowed for identification and location of areas which needed further decontamination. Finally, a discussion on possible future improvements and field conclusions was made

  3. Radiation survey and management on the reconstructed radioactive work-site

    International Nuclear Information System (INIS)

    Yu Tao; Liang Shiqiang; Wang Youmei

    2004-12-01

    The experiences of radiation survey and administration in the prophase on reconstructed radioactive work-site are summarized. The advance works are to investigate the reconstructed work-site, settle working plans, devise inspecting flow charts, deal with something in time in the local and train the staffers. The works about prophasic decontaminating, removing and cleaning up the site have been finished, which have established the deep foundation to develop later task. (authors)

  4. A Data Scheduling and Management Infrastructure for the TEAM Network

    Science.gov (United States)

    Andelman, S.; Baru, C.; Chandra, S.; Fegraus, E.; Lin, K.; Unwin, R.

    2009-04-01

    currently partnering with the San Diego Super Computer Center to build the data management infrastructure. Data collected from the three core protocols as well as others are currently made available through the TEAM Network portal, which provides the content management framework, the data scheduling and management framework, an administrative framework to implement and manage TEAM sites, collaborative tools and a number of tools and applications utilizing Google Map and Google Earth products. A critical element of the TEAM Network data management infrastructure is to make the data publicly available in as close to real-time as possible (the TEAM Network Data Use Policy: http://www.teamnetwork.org/en/data/policy). This requires two essential tasks to be accomplished, 1) A data collection schedule has to be planned, proposed and approved for a given TEAM site. This is a challenging process since TEAM sites are geographically distributed across the tropics and hence have different seasons where they schedule field sampling for the different TEAM protocols. Capturing this information and ensuring that TEAM sites follow the outlined legal contract is key to the data collection process and 2) A stream-lined and efficient information management system to ensure data collected from the field meet the minimum data standards (i.e. are of the highest scientific quality) and are securely transferred, archived, processed and be rapidly made publicaly available, as a finished consumable product via the TEAM Network portal. The TEAM Network is achieving these goals by implementing an end-to-end framework consisting of the Sampling Scheduler application and the Data Management Framework. Sampling Scheduler The Sampling Scheduler is a project management, calendar based portal application that will allow scientists at a TEAM site to schedule field sampling for each of the TEAM protocols implemented at that site. The sampling scheduler addresses the specific requirements established in the

  5. Site study plan for EDBH [Engineering Design Boreholes] seismic surveys, Deaf Smith County site, Texas: Revision 1

    International Nuclear Information System (INIS)

    Hume, H.

    1987-12-01

    This site study plan describes seismic reflection surveys to run north-south and east-west across the Deaf Smith County site, and intersecting near the Engineering Design Boreholes (EDBH). Both conventional and shallow high-resolution surveys will be run. The field program has been designed to acquire subsurface geologic and stratigraphic data to address information/data needs resulting from Federal and State regulations and Repository program requirements. The data acquired by the conventional surveys will be common-depth- point, seismic reflection data optimized for reflection events that indicate geologic structure near the repository horizon. The data will also resolve the basement structure and shallow reflection events up to about the top of the evaporite sequence. Field acquisition includes a testing phase to check/select parameters and a production phase. The field data will be subjected immediately to conventional data processing and interpretation to determine if there are any anamolous structural for stratigraphic conditions that could affect the choice of the EDBH sites. After the EDBH's have been drilled and logged, including vertical seismic profiling, the data will be reprocessed and reinterpreted for detailed structural and stratigraphic information to guide shaft development. The shallow high-resulition seismic reflection lines will be run along the same alignments, but the lines will be shorter and limited to immediate vicinity of the EDBH sites. These lines are planned to detect faults or thick channel sands that may be present at the EDBH sites. 23 refs. , 7 figs., 5 tabs

  6. Job schedul in Grid batch farms

    International Nuclear Information System (INIS)

    Gellrich, Andreas

    2014-01-01

    We present here a study for a scheduler which cooperates with the queueing system TORQUE and is tailored to the needs of a HEP-dominated large Grid site with around 10000 jobs slots. Triggered by severe scaling problems of MAUI, a scheduler, referred to as MYSCHED, was developed and put into operation. We discuss conceptional aspects as well as experiences after almost two years of running.

  7. Nuclear energy center site survey: fuel cycle studies

    International Nuclear Information System (INIS)

    1976-05-01

    Background information for the Nuclear Regulatory Commission Nuclear Energy Center Site Survey is presented in the following task areas: economics of integrated vs. dispersed nuclear fuel cycle facilities, plutonium fungibility, fuel cycle industry model, production controls and failure contingencies, environmental impact, waste management, emergency response capability, and feasibility evaluations

  8. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  9. An aerial radiological survey of the Central Savannah River Site, Aiken, South Carolina

    International Nuclear Information System (INIS)

    Feimster, E.L.

    1991-09-01

    An aerial radiological survey was conducted over a 194-square- kilometer (75-square-mile) area encompassing the central portion of the Savannah River Site (SRS). The survey was flown during February 10--27, 1987. These radiological measurements were used as baseline data for the central area and for determining the extent of man-made radionuclide distribution. Previous SRS surveys included small portions of the area; the 1987 survey was covered during the site- wide survey conducted in 1979. Man-made radionuclides (including cobalt-60, cesium-137, protactinium-234m, and elevated levels of uranium-238 progeny) that were detected during the survey were typical of those produced by the reactor operations and material processing activities being conducted in the area. The natural terrestrial radiation levels were consistent with those measured during prior surveys of other SRS areas. 1 refs., 4 figs

  10. CERCLA document flow: Compressing the schedule, saving costs, and expediting review at the Savannah River Site

    International Nuclear Information System (INIS)

    Hoffman, W.D.

    1991-01-01

    The purpose of this paper is to convey the logic of the CERCLA document flow including Work Plans, Characterization Studies, Risk Assessments, Remedial Investigations, Feasibility Studies, proposed plans, and Records of Decision. The intent is to show how schedules at the Savannah River Site are being formulated to accomplish work using an observational approach where carefully planned tasks can be initiated early and carried out in parallel. This paper will share specific proactive experience in working with the EPA to expedite projects, begin removal actions, take interim actions, speed document flow, and eliminate unnecessary documents from the review cycle

  11. Basic Features of Customer Satisfaction with Train Schedules

    Science.gov (United States)

    Murakoshi, Akiko; Kunimatsu, Taketoshi; Saito, Ayano

    This paper aims to reveal the fundamental features of customer satisfaction with train schedules, which is one of the most basic services provided by a railway company. A customer satisfaction survey of passengers who frequently utilize three lines in the metropolitan area was conducted; we obtained the following findings: (a) out of nine factors to evaluate a train schedule from a passenger's viewpoint, the four most important ones are the frequency of trains running, punctuality, congestion rate, and time distance; (b) the ride-frequency influences the degree of satisfaction with train schedules in a particular line; and (c) it is important to set a numeric goal for the level of customer satisfaction by grasping the relationship between the transport service and a passenger's satisfaction with that service. The difference between customer satisfaction and passenger disutility is also discussed. The findings are expected to help conduct customer satisfaction surveys and also to form the basis for establishing a method by which to evaluate a train schedule from passengers' satisfaction ratings.

  12. Schedule unreliability in liner shipping : Origins and consequences for the hinterland supply chain

    NARCIS (Netherlands)

    Vernimmen, Bert; Dullaert, Wout; Engelen, Steve

    Despite claims by shipping lines that most of their containerships operate on fixed-day weekly schedules, a large survey recently revealed that over 40 of the vessels deployed on worldwide liner services arrive one or more days behind schedule. Broadly speaking, the survey found relatively low

  13. NAGRA - Sites for geological repositories - Geological surveys for stage 3

    International Nuclear Information System (INIS)

    2014-01-01

    This brochure published by the Swiss National Cooperative for the Disposal of Radioactive Waste (NAGRA) examines the aims involved in the selection of sites for deep geological repositories for nuclear wastes in Switzerland. Various methods involved in their implementation are described. These include 3D-seismology, deep probe drillings, shallow drillings as well as field studies, gravimetric measurements and the study of the electrical properties of the ground and rock involved. These factors are discussed in detail. Maps are presented of the locations that are to be surveyed and details of the selected perimeters are shown. Also, the layout of a sample drilling site is presented. A timescale for the various surveys and work to be done is presented

  14. Land use and demography survey for a large superfund site

    International Nuclear Information System (INIS)

    Hattemer-Frey, H.A.; Quinlan, R.E.; Krieger, G.R.; Lau, V.

    1994-01-01

    Inconsistencies in the exposure assessment process often arise when risk assessors are forced to make assumptions about the frequency and duration of exposures in the absence of site-specific data. EPA encourages the collection of site-specific data so that risks can be more accurately assessed on a case-by-case basis. Typically, estimates of exposure frequency and duration represent the largest source of uncertainty for non-food related exposure pathways, while the largest source of uncertainty for foodchain pathways stems primarily from estimating the fraction ingested that originated from the affected area. A Land Use and Demography Survey was conducted to obtain site-specific information on: (1) the amount of time individuals spend indoors, outdoors, and on or near affected areas; (2) recreational use of surface water bodies on-site; (3) the percentage of food items consumed that were raised or produced locally; and (4) other behavioral patterns and activities that could influence their exposure to site-related chemicals. More than 300 households were randomly selected and the residents personally interviewed. A wide variety of individuals ranging from children to elderly residents with vastly different recreational, behavioral, and consumption patterns were interviewed. This paper discusses the survey results in relation to EPA standard default exposure assumptions

  15. Quarterly environmental radiological survey summary: Third quarter 1994--100, 200, 300, and 600 Areas

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1994-11-01

    This report provides a summary of the radiological surveys performed on waste disposal sites located at the Hanford Site. The Third Quarter 1994 survey results and the status of actions required from current and past reports and are summarized below: (1) All the routine environmental radiological surveys scheduled during July, August, and September 1994 were completed except for the D Island vent riser area. The surveys for the 200-W railways, spurs, and sidings were completed during this period after being delayed by equipment problems during the second quarter. (2) No Compliance Assessment Reports (CARs) were issued for sites found out of compliance with standards identified in WHC-CM-7-5, Environmental Compliance. (3) Two Surveillance Compliance/Inspection Reports (SCIRs) were closed during the Third Quarter of 1994. (4) Eleven open SCIRs had not been resolved

  16. Dungeness crab survey for the Southwest Ocean Disposal Site off Grays Harbor, Washington, June 1990

    Energy Technology Data Exchange (ETDEWEB)

    Higgins, B.J.; Pearson, W.H. (Battelle/Marine Sciences Lab., Sequim, WA (United States))

    1991-09-01

    As part of the Grays Harbor Navigation Improvement Project, the Seattle District of the US Army Corps of Engineers has begun active use of the Southwest Ocean Disposal Site off Grays Harbor, Washington. This survey was to verify that the location of the area of high crab density observed during site selection surveys has not shifted into the Southeast Ocean Disposal Site. In June 1990, mean densities of juvenile Dungeness crab were 146 crab/ha within the disposal site and 609 crab/ha outside ad north of the disposal site. At nearshore locations outside the disposal site, juvenile crab density was 3275 crab/ha. Despite the low overall abundance, the spatial distribution of crab was such that the high crab densities in 1990 have remained outside the Southwest Ocean Disposal Site. The survey data have confirmed the appropriateness of the initial selection of the disposal site boundaries and indicated no need to move to the second monitoring tier. 8 refs., 9 figs., 2 tabs.

  17. Surface and subsurface gamma survey of the Kellex Site, Jersey City, New Jersey: dates of survey, September 8-November 11, 1980

    International Nuclear Information System (INIS)

    Fritzsche, A.E.

    1981-04-01

    The Kellex Site of about 6.2 hectares in Jersey City, New Jersey was surveyed by an in situ gamma measuring system. The system consisted of a high purity germanium detector and electronics mounted on a tracked vehicle. The entire site was surveyed on a 20 meter grid that may be transformed to New Jersey grid coodinates. A fraction of the site was surveyed on a 5 m grid. The subsurface soil was surveyed to a 1 m depth by means of a trenching operation that brought the subsurface soil to the surface. The in situ gamma data were converted to activity concentrations of uranium, thorium and potassium in the Kellex soil. Individual measurements were compared to the mean site concentrations to ascertain those areas that differ significantly from the mean. Only 238 U and 235 U appear to exist at Kellex in significant excess of the Kellex means, which in turn approximate New Jersey natural concentrations. No Kellex soil appears to exceed the investigative guideline for 238 U of 40 pCi/g in a 400 m 2 area 20 cm thick

  18. Nuclear energy center site survey reactor plant considerations

    International Nuclear Information System (INIS)

    1976-05-01

    The Energy Reorganization Act of 1974 required the Nuclear Regulatory Commission (NRC) to make a nuclear energy center site survey (NECSS). Background information for the NECSS report was developed in a series of tasks which include: socioeconomic inpacts; environmental impact (reactor facilities); emergency response capability (reactor facilities); aging of nuclear energy centers; and dry cooled nuclear energy centers

  19. Site Study Plan for soils, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Soils Site Study Plan describes a field program consisting of a soil characterization survey, impact monitoring of soils, predisturbance soil salinity survey, and a reclamation suitability study. This information will be used to plan for soil stripping, stockpiling, and replacement; reclamation of soils; determining predisturbance chemical and physical characteristics of the soils; including salinity levels; and monitoring for changes in chemical and physical characteristics of the soil. The SSP describes for each study the need for the study, the study design, data management and use, schedule of proposed activities, and the quality assurance program. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document. 75 refs., 10 figs., 5 tabs

  20. Microgravity survey of the Oak Ridge K-25 Site, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Kaufmann, R.D.

    1996-05-01

    Karst features are known to exist within the carbonate bedrock of the Oak Ridge K-25 Site and may play an important role in groundwater flow and contaminant migration. This report discusses the results of a microgravity survey of the Oak Ridge K-25 Site. The main objective of the survey is to identify areas containing bedrock cavities. Secondary objectives included correlating the observed gravity to the geology and to variations in overburden thickness. The analysis includes 11 profile lines that are oriented perpendicular to the geologic strike and major structures throughout the K-25 Site. The profile lines are modeled in an effort to relate gravity anomalies to karst features such as concentrations of mud-filled cavities. Regolith thickness and density data provided by boreholes constrain the models. Areally distributed points are added to the profile lines to produce a gravity contour map of the site. In addition, data from the K-901 area are combined with data from previous surveys to produce a high resolution map of that site. The K-25 Site is located in an area of folded and faulted sedimentary rocks within the Appalachian Valley and Ridge physiographic province. Paleozoic age rocks of the Rome Formation, Knox Group, and Chickamauga Supergroup underlie the K-25 Site and contain structures that include the Whiteoak Mountain Fault, the K-25 Fault, a syncline, and an anticline. The mapped locations of the rock units and complex structures are currently derived from outcrop and well log analysis

  1. Site Study Plan for Aesthetics, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Aesthetic Site Study Plan describes a field program consisting of identification of the visually affected area; determination of scenic quality, visual sensitivity, and visual management classes of the site and vicinity; and analysis of the level of visual contrast that would be created by the project. Field ratings of scenic quality, visual sensitivity, and visual contrast will be supplemented by a public perception survey designed to incorporate the views of the public. This plan describes the need for the study, the study design, data management and use, schedule for proposed activities, and quality assurance program. This study will provide data needed to satisfy requirements contained in, or derived from, SRPO Requirement Document (SRP-RD). 35 refs., 6 figs., 2 tabs

  2. A survey of the underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    Pinto, S.

    1979-12-01

    The idea of locating nuclear power plants underground is not new, since in the period of time between the late fifties and the early sixties, four small nuclear plants have been built in Europe in rock cavities. Safety has been, in general, the main motivation for such a siting solution. In the last years several factors such as increasing power transmission costs, decreasing number of suitable sites above ground, increased difficulties in obtaining site approval by the licensing authorities, increasing opposition to nuclear power, increasing concern for extreme - but highly improbable - accidents, together with the possibility of utilizing the waste heat and the urban siting concept have renewed the interest for the underground siting as an alternative to surface siting. The author presents a survey of the main studies carried out on the subject of underground siting. (Auth.)

  3. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  4. Survey dataset on occupational hazards on construction sites

    Directory of Open Access Journals (Sweden)

    Patience F. Tunji-Olayeni

    2018-06-01

    Full Text Available The construction site provides an unfriendly working conditions, exposing workers to one of the harshest environments at a workplace. In this dataset, a structured questionnaire was design directed to thirty-five (35 craftsmen selected through a purposive sampling technique on various construction sites in one of the most populous cities in sub-Saharan Africa. The set of descriptive statistics is presented with tables, stacked bar chats and pie charts. Common occupational health conditions affecting the cardiovascular, respiratory and musculoskeletal systems of craftsmen on construction sites were identified. The effects of occupational health hazards on craftsmen and on construction project performance can be determined when the data is analyzed. Moreover, contractors’ commitment to occupational health and safety (OHS can be obtained from the analysis of the survey data. Keywords: Accidents, Construction industry, Craftsmen, Health, Occupational hazards

  5. An aerial radiological survey of Areas 16 and 30, Nevada Test Site: Date of survey: June 1983

    International Nuclear Information System (INIS)

    Bluitt, C.M.

    1986-10-01

    An aerial radiological survey of the Nevada Test Site (NTS) was conducted for the US Department of Energy (DOE). The survey period was from 1 June to 16 June 1983, during which airborne measurements were obtained over Areas 16 and 30. The data were used to generate exposure rate, cobalt-60, and cesium-137 spatial distribution maps. The aerial survey results are expressed as exposure rate, cesium-137, and cobalt-60 isopleth contours, superimposed on NTS maps. 12 refs., 16 figs

  6. Case scheduling preferences of one Surgeon's cataract surgery patients.

    Science.gov (United States)

    Dexter, Franklin; Birchansky, Lee; Bernstein, James M; Wachtel, Ruth E

    2009-02-01

    The increase in the number of operating rooms nationwide in the United States may reflect preferences of patients for scheduling of outpatient surgery. Yet, little is known of the importance that patients place on scheduling convenience and flexibility. Fifty cataract surgery patients seen by a surgeon at his main office during a 6-mo period responded to a marketing survey. All the patients had Medicare insurance and supplemental insurance permitting surgery at any facility. A telephone questionnaire included four vignettes describing different choices in the scheduling of cataract surgery. Respondents were asked how far they would be willing to travel for one option instead of another. For example, "Your surgery will be on Thursday in three weeks at 2 pm. You can drink water until 9 am. You arrive at 10 am, because your surgery might start early. If you travel farther, you would arrive at 8 am for 9 am surgery." The median (50th percentile) additional travel time was 60 min (lower 95% confidence bound >or=52 min) for each of four options: to receive care on a day chosen by the patient instead of assigned by the physician, to receive care at a single site instead of both the surgeon's office and a surgery center at a different location, to combine the examination and the surgery into a single visit instead of two visits, and to have surgery in the morning instead of the afternoon. The patients of this ophthalmologist placed a high value on convenience and flexibility in scheduling their surgery. In general, this would be achievable only if many operating rooms were available each morning.

  7. Surveys for desert tortoise on the proposed site of a high-level nuclear waste repository at the Nevada Test Site

    International Nuclear Information System (INIS)

    Collins, E.; Sauls, M.L.; O'Farrell, T.P.

    1983-01-01

    The National Waste Terminal Storage Program is a national search for suitable sites to isolate commercial spent nuclear fuel or high-level radioactive waste. The Nevada Nuclear Waste Storage Investigation (NNWSI) managed by the U.S. Department of Energy (DOE), Nevada Operations Office, was initiated to study the suitability of a portion of Yucca Mountain on the DOE's Nevada Test Site (NTS) as a location for such a repository. EG and G was contracted to provide information concerning the ecosystems encountered on the site. A comprehensive literature survey was conducted to evaluate the status and completeness of the existing biological information for the previously undisturbed area. Site specific studies were begun in 1981 when preliminary field surveys confirmed the presence of the desert tortoise (Gopherus agassizi) within the project area FY82 studies were designed to determine the overall distribution and abundance of the tortoise within the area likely to be impacted by NNWSI activities. The Yucca Mountain area of the Nevada Test Site is situated close to the northern range limit of the desert tortoise. Prior to the 1982 surveys, the desert tortoise was reported from only nine locations on NTS. A known population had been under study in Rock Valley about 25 miles southeast of the project area. However, the distribution and population densities of tortoise in the southwest portion of NTS were virtually unknown. Results of our surveys indicate that desert tortoise can be expected, albeit in small numbers, in a wide range of Mojavean and Transitional habitats

  8. 2014-2016 Avian Point Count and Migration Surveys at Site 300 for the Lawrence Livermore National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Fratanduono, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-04-14

    The primary goals of the surveys were to: 1) collect minutes of bird activity within Site 300, 2) consider relative abundance of the different bird species occurring within the Site, 3) collect behavioral information, and 4) provide compelling evidence to determine the status of the Site as a migration corridor or migration stopover site. To this end, two survey types were conducted: avian point counts were conducted on a monthly basis from February 2014 through January 2016 and migration surveys were conducted over two three-month periods from September 2014 through November 2014, and September 2015 through November 2015. These two surveys types provided the opportunity to observe avian species in a variety of conditions across a two year period. Whenever possible or relevant, the observations of either survey were used to inform and complement the observations of the other survey in pursuit of the above goals. Both survey types are described below.

  9. 5 CFR 532.279 - Special wage schedules for printing positions.

    Science.gov (United States)

    2010-01-01

    ... the printing survey as follows: (1) The lead agency must include North American Industry... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Special wage schedules for printing... printing positions. (a) The lead agency in a special printing schedule area listed in paragraph (j) of this...

  10. IATI/IITA Implementation Schedule IDRC 07-15

    International Development Research Centre (IDRC) Digital Library (Canada)

    Barbara Porrett

    2016-01-07

    Jan 7, 2016 ... Part I – Common Standard - Implementation schedule. 1. ... Transparency Initiative (IATI) formulated the framework for a common standard. ... Survey (FSS) - two reporting instruments of the OECD - plus the International Aid.

  11. Challenges with Final Status Surveys at a Large Decommissioning Site - 13417

    International Nuclear Information System (INIS)

    Downey, Heath; Collopy, Peter; Shephard, Eugene; Walter, Nelson; Conant, John

    2013-01-01

    As part of decommissioning a former nuclear fuel manufacturing site, one of the crucial final steps is to conduct Final Status Surveys (FSS) in order to demonstrate compliance with the release criteria. At this decommissioning site, the area for FSS was about 100 hectares (248 acres) and included varying terrain, wooded areas, ponds, excavations, buildings and a brook. The challenges in performing the FSS included determining location, identifying FSS units, logging gamma walkover survey data, determining sample locations, managing water in excavations, and diverting water in the brook. The approaches taken to overcome these challenges will be presented in the paper. The paper will present and discuss lessons learned that will aid others in the FSS process. (authors)

  12. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey, a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H ampersand S) plan, and a waste management plan

  13. Health survey on cancers about the Tricastin nuclear site

    International Nuclear Information System (INIS)

    2010-01-01

    This survey aims at describing the health status of the population around the Tricastin site, and more particularly at determining whether there is a difference between death or cancer occurrence frequencies observed around this site with respect to reference frequencies. It does not aim at assessing the health impact of the site industrial installations. Cancer mortality data, cancer diagnosis data, demographic data, child cancer data, data related to hospital stays in relationship with cancer, long duration hospital stay data, and mortality data are used. Several indicators are defined and used: standardised mortality ratio, standardised hospitalisation ratio. Data are also analysed in terms of location, and socio-demographic categories. It appears that there is no specific health situation for the considered area, except for pancreas cancer for women

  14. Survey on solar dryers for drying of food and wood in Ghana

    Energy Technology Data Exchange (ETDEWEB)

    Oestergaard Jensen, S.; Correll Frank, F. [Danish Technological Inst., Taastrup (Denmark); Floejgaard Kristensen, E. [Danish Inst. of Agricultural Sciences, Tjele (Denmark)

    1999-11-01

    The survey was conducted as a part of the project 'Test and Research Project into the Drying of Food and Wood Products with Solar Heat'. The aim of the survey was to investigate the need for drying of food and wood in Ghana and the already existing experience on solar drying in order to form a basis for the initial decisions within the project concerning the location of three demonstration solar dryers for crops, fish and wood, which species to dry and the type of solar dryers. The project deals with transfer of knowledge in the field of drying of crops and wood and solar air heating systems from Denmark to Ghana. The aim of the survey was, therefore, also to give the Danish experts an impression of the conditions in Ghana in order to facilitate an appropriate design of the solar dryers. Three of the four Danish partners participated in the survey. The fourth Danish partner - the manufacturer of solar heating systems Aidt Miljoe - are already familiar with the conditions in Ghana due to an earlier project in Ghana. The survey was planed by the Energy Commission of Ghana, the Ghanaian partner and consultants: DENG, University of Science and Technology, Kumasi and Econkoad. The time schedules for the survey - one for crops/fish and one for wood - are found in Annex A. The schedules were very well prepared and the sites to visit were well chosen. The visits gave the Danish experts a good overview of the situation in Ghana in the field of post harvesting of crops, handling of fish, drying and manufacturing of wood and existing experience on solar drying. The schedules included a large variety of different information and impressions e.g. ranging from large sawmill to small carpenters and workshops. Despite tight schedules the consultants managed to stick very close to the time schedules shown in Annex A. (au)

  15. Geophysical surveys at the UMTRA project Shiprock, New Mexico site

    International Nuclear Information System (INIS)

    Wightman, E.; Smith, B.; Newlin, B.

    1996-03-01

    Geophysical surveys were performed at the Uranium Mill Tailings Remedial Action (UMTRA) Shiprock site in New Mexico during February 1996. The surveys were designed to locate areas of ground water contamination, consisting largely of sulfate and nitrate salts and uranium. Electrical geophysical methods were used to locate areas of sulfate and nitrate concentrations since these products, when present in ground water, increase its electrical conductivity. These contaminants also increase the density of water, making the water with the highest concentrations of these salts sink to the bottom of the water column. At the Shiprock site, where alluvium is underlain by the impervious Mancos Shale, the saline water will tend to rest in depressions on the shale surface. Seismic refraction surveys were conducted on the floodplain. The site comprises two areas, the terrace and the floodplain, separated by a steep scarp of some 70 feet (ft) (20 meters [m]). Measurements of electrical conductivity were taken over these two areas, searching for possible pockets of saline ground water resting on top of the bedrock. Conductivity surveys were also run to identify fractures within the bedrock that may act as conduits for ground water movement. Several areas of higher than normal conductivity were found on the terrace, including halos of higher conductivities on three sides of the tailings cell. The conductivity measurements searching for fractures found only a small number of minor fracture-like anomalies. These are not considered important. On the floodplain, both conductivity and seismic refraction measurements were taken. The conductivity measurements clearly show areas of high conductivity interpreted to result from ground water contamination. The seismic refraction measurements identified bedrock depressions that may contain denser, and more saline ground water lenses. Generally, the areas of high conductivity coincide with the bedrock depressions

  16. Maritime wideband communication networks video transmission scheduling

    CERN Document Server

    Yang, Tingting

    2014-01-01

    This Springer Brief covers emerging maritime wideband communication networks and how they facilitate applications such as maritime distress, urgency, safety and general communications. It provides valuable insight on the data transmission scheduling and protocol design for the maritime wideband network. This brief begins with an introduction to maritime wideband communication networks including the architecture, framework, operations and a comprehensive survey on current developments. The second part of the brief presents the resource allocation and scheduling for video packet transmission wit

  17. Patient Safety Activity Under the Social Insurance Medical Fee Schedule in Japan: An Overview of the 2010 Nationwide Survey.

    Science.gov (United States)

    Hirose, Masahiro; Kawamura, Toshihiko; Igawa, Mikio; Imanaka, Yuichi

    2017-11-16

    Little is known about patient safety performance under the social insurance medical fee schedule in Japan. The Health Ministry in Japan introduced the preferential patient safety countermeasure fee (PPSCF) to promote patient safety in 2006 and revised the PPSCF system in 2010. This study aims to address the patient safety performance status at hospitals implementing the PPSCF. A nationwide questionnaire survey targeting 2674 hospitals with the PPSCF was performed in 2010 to 2011. The 627 participant hospitals were divided into the following three groups: 178 hospitals implementing PPSCF 1 with 400 beds or more (group A), 286 hospitals implementing PPSCF 1 with 399 beds or fewer (group B), and 163 hospitals implementing PPSCF 2 (group C). The mean numbers (standard errors) of patient safety managers were 1.45 (0.07) in group A, 1.12 (0.04) in group B, and 0.37 (0.12) in group C (P fee schedule in Japan.

  18. Fiscal 1999 research report. Survey on geothermal development sites (Survey on natural environment); 1999 nendo chinetsu kaihatsu sokushin chosa. Shizen kankyo chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This report summarizes the result on selecting sites for large-caliber production wells, and landscape characteristic evaluation for simulation, based on the landscape survey on C candidate site for geothermal development. Field survey was made on landscape, plants and animals in the Kirishima Eboshidake area. It was clarified that this area has diverse flora including some rare species such as rein orchid and monkshood which are listed as endangered species. In addition, not a few epiphytes were identified. The zoological survey result showed that planted forests of evergreen coniferous trees which cover a wide range of the surveyed area, and peripheral grassland, scrub and natural forests provide good habitats for mammals such as sika deer and wild boars. On the other hand, no animal species in need of special protection were found. Geologically some traces of landslide occurrence in the past were detected in the northern part of the surveyed area relatively. As the survey result, some promising sites suitable for geothermal development were selected, which are judged to have a relatively small impact on natural environment and landscape. (NEDO)

  19. Environmental survey of southern part of former Semipalatinsk test site

    International Nuclear Information System (INIS)

    Zharikov, S.K.

    2000-01-01

    The present paper discusses results of the environmental survey performed in selected areas of Semipalatinsk test site southern part and gives calculations of possible annual radionuclide (Cs-37, Sr-90 and Pu-239/240) intake due to local husbandry products. (author)

  20. Baccalaureate nursing education at extension sites: a survey.

    Science.gov (United States)

    Tiffany, J C; Burson, J Z

    1986-03-01

    The use of extension sites in baccalaureate nursing education has increased significantly since 1978. This survey found that the majority of extension sites were developed for RNs although large numbers of generic students are also served. The use of extension sites ranges from delivering selected courses away from the lead campus to delivering an entire program. Extension sites may be located on other university campuses or may be found in a store front setting or other community agency. Administrative control of extension sites emanates from the lead campus. Faculty participation in faculty activities, such as school of nursing or university committees, is expected. The degree to which this is accomplished, however, may vary. In order to maintain program integrity, the curriculum must remain the same regardless of where it is implemented. One of the primary ways of doing this is to use the same syllabi, texts and, in many cases, the same exams. Faculty may be stationary at established extended sites or may travel from the lead campus to teach, carrying with them educational materials. Extension sites are a phenomenon of the here and now. They provide a way of delivering baccalaureate nursing education to students who might otherwise be denied this level of education. Extension sites may be operationally cumbersome, challenging, and costly, but they are meeting a need. With the advent of more sophisticated telecommunications and the continued demand for baccalaureate level education, the possibility exists for even greater variation and potential for this type of program.

  1. Ground-penetrating radar and electromagnetic surveys at the Monroe Crossroads battlefield site, Fort Bragg, North Carolina

    Science.gov (United States)

    Kessler, Richard; Strain, R.E.; Marlowe, J. I.; Currin, K.B.

    1996-01-01

    A ground-penetrating radar survey was conducted at the Monroe Crossroads Battlefield site at Fort Bragg, North Carolina, to determine possible locations of subsurface archaeological features. An electromagnetic survey also was conducted at the site to verify and augment the ground-penetrating radar data. The surveys were conducted over a 67,200-square-foot grid with a grid point spacing of 20 feet. During the ground-penetrating radar survey, 87 subsurface anomalies were detected based on visual inspection of the field records. These anomalies were flagged in the field as they appeared on the ground-penetrating radar records and were located by a land survey. The electromagnetic survey produced two significant readings at ground-penetrating radar anomaly locations. The National Park Service excavated 44 of the 87 anomaly locations at the Civil War battlefield site. Four of these excavations produced significant archaeological features, including one at an abandoned well.

  2. Round robin scheduling - a survey

    DEFF Research Database (Denmark)

    Rasmussen, Rasmus Vinther; Trick, Michael A.

    2008-01-01

    This paper presents a comprehensive survey on the literature considering round robin tournaments. The terminology used within the area has been modified over time and today it is highly inconsistent. By presenting a coherent explanation of the various notions we hope that this paper will help to ...

  3. Job shop scheduling by local search

    NARCIS (Netherlands)

    Vaessens, R.J.M.; Aarts, E.H.L.; Lenstra, J.K.

    1994-01-01

    We survey solution methods for the job shop scheduling problem with an emphasis on local search. We discuss both cleterministic and randomized local search methods as well as the applied neighborhoods. We compare the computational performance of the various methods in terms of their effectiveness

  4. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  5. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  6. Demographic survey around proposed nuclear power plant site in Haryana covering 30 km radius area from the site

    International Nuclear Information System (INIS)

    Garg, V.K.

    2013-01-01

    This study was planned to have a demographic survey of the households living within 30 km radius of the proposed site. Objectives of the present study were to attain the quantitative baseline demographic data around (within 30 km radius) the proposed site of nuclear power plant, zone-wise and sector-wise distribution of the population around proposed site up to a distance of 30 km from the site, to obtain the data on socio-economic, cultural, and religious perspectives of the target populations, to obtain the data on disease/illness pattern in the target population, health status and mortality rate

  7. Wetland survey of selected areas in the K-24 Site Area of responsibility

    Energy Technology Data Exchange (ETDEWEB)

    Rosensteel, B.A.; Awl, D.J. [JAYCOR, Environmental Division, Oak Ridge, TN (United States)

    1995-07-01

    In accordance with DOE Regulations for Compliance with Floodplain/Wetlands Environmental Review Requirements, wetland surveys were conducted in selected areas within the K-25 Area of Responsibility during the summer of 1994. These areas are Mitchell Branch, Poplar Creek, the K-770 OU, Duct Island Peninsula, the Powerhouse area, and the K-25 South Corner. Previously surveyed areas included in this report are the main plant area of the K-25 Site, the K-901 OU, the AVLIS site, and the K-25 South Site. Wetland determinations were based on the USACE methodology. Forty-four separate wetland areas, ranging in size from 0.13 to 4.23 ha, were identified. Wetlands were identified in all of the areas surveyed with the exception of the interior of the Duct Island Peninsula and the main plant area of the K-25 Site. Wetlands perform functions such as floodflow alteration, sediment stabilization, sediment and toxicant retention, nutrient transformation, production export, and support of aquatic species and wildlife diversity and abundance. The forested, scrub-shrub, and emergent wetlands identified in the K-25 area perform some or all of these functions to varying degrees.

  8. Wetland survey of selected areas in the K-24 Site Area of responsibility

    International Nuclear Information System (INIS)

    Rosensteel, B.A.; Awl, D.J.

    1995-07-01

    In accordance with DOE Regulations for Compliance with Floodplain/Wetlands Environmental Review Requirements, wetland surveys were conducted in selected areas within the K-25 Area of Responsibility during the summer of 1994. These areas are Mitchell Branch, Poplar Creek, the K-770 OU, Duct Island Peninsula, the Powerhouse area, and the K-25 South Corner. Previously surveyed areas included in this report are the main plant area of the K-25 Site, the K-901 OU, the AVLIS site, and the K-25 South Site. Wetland determinations were based on the USACE methodology. Forty-four separate wetland areas, ranging in size from 0.13 to 4.23 ha, were identified. Wetlands were identified in all of the areas surveyed with the exception of the interior of the Duct Island Peninsula and the main plant area of the K-25 Site. Wetlands perform functions such as floodflow alteration, sediment stabilization, sediment and toxicant retention, nutrient transformation, production export, and support of aquatic species and wildlife diversity and abundance. The forested, scrub-shrub, and emergent wetlands identified in the K-25 area perform some or all of these functions to varying degrees

  9. Activities on the site during construction phase

    International Nuclear Information System (INIS)

    Fickel, O.F.

    1977-01-01

    A survey is given of the work done on the site from site-opening till turn over of the plant to the client. After a short introduction to time schedules, manpower on site, site facilities and civil work and constructions, the commissioning and trial operation phase is discussed in detail. This phase begins with finishing the assembly of individual systems and components and ends with the trial operation and the acceptance measurement. During this period the subsystems are started-up in a useful sequence, first from cold, then from hot conditions and are finally operated as a total with nuclear energy. The single steps are: a) commissioning of indivudal systems; b) hot functional test 1 (without fuels) c) baseline inspection at the reactor pressure vessel; d) hot functional test 2 (with fuels); e) preparation for first criticality; f) postcriticality test program; g) trial operation: h) acceptance measurement. (HP) [de

  10. Program Director as Webmaster? Analysis of 131 Anesthesiology Department Web Sites and Program Director Web Site Involvement and Opinion Survey.

    Science.gov (United States)

    Daneshpayeh, Negin; Lee, Howard; Berger, Jeffrey

    2013-01-01

    The last formal review of academic anesthesiology department Web sites (ADWs) for content was conducted in 2009. ADWs have been rated as very important by medical students in researching residency training programs; however, the rapid evolution of sites require that descriptive statistics must be more current to be considered reliable. We set out to provide an updated overview of ADW content and to better understand residency program directors' (PD) role and comfort with ADWs. Two independent reviewers (ND and HL) analyzed all 131 Accreditation Council for Graduate Medical Education (ACGME) accredited ADWs. A binary system (Yes/No) was used to determine which features were present. Reviewer reliability was confirmed with inter-rater reliability and percentage agreement calculation. Additionally, a blinded electronic survey (Survey Monkey, Portland, OR) was sent to anesthesiology residency PDs via electronic mail investigating the audiences for ADWs, the frequency of updates and the degree of PD involvement. 13% of anesthesiology departments still lack a Web site with a homepage with links to the residency program and educational offerings (18% in 2009). Only half (55%) of Web sites contain information for medical students, including clerkship information. Furthermore, programs rarely contain up-to-date calendars (13%), accreditation cycle lengths (11%), accreditation dates (7%) or board pass rates (6%). The PD survey, completed by 42 of 131 PDs, noted a correlation (r = 0.36) between the number of years as PD and the frequency of Web site updates - less experienced PDs appear to update their sites more frequently (p = 0.03). Although 86% of PDs regarded a Web site as "very" important in recruitment, only 9% felt "very" comfortable with the skills required to advertise and market a Web site. Despite the overall increase in ADW content since 2009, privacy concerns, limited resources and time constraints may prevent PDs from providing the most up-to-date Web sites for

  11. Learned Helplessness as a Schedule-Shift Effect.

    Science.gov (United States)

    McReynolds, William T.

    1980-01-01

    The essentials of learned helplessness theory are described and supporting evidence surveyed. The explanation Seligman and Maier give for these findings is critically analyzed. A schedule-shift discrimination theory of learned helplessness effects is also discussed. (Author)

  12. An Aerial Radiological Survey of Selected Areas of Area 18 - Nevada Test Site

    International Nuclear Information System (INIS)

    Lyons, Craig

    2009-01-01

    As part of the proficiency training for the Radiological Mapping mission of the Aerial Measuring System (AMS), a survey team from the Remote Sensing Laboratory-Nellis (RSL-Nellis) conducted an aerial radiological survey of selected areas of Area 18 of the Nevada Test Site (NTS) for the purpose of mapping man-made radiation deposited as a result of the Johnnie Boy and Little Feller I tests. The survey area centered over the Johnnie Boy ground zero but also included the ground zero and deposition area of the Little Feller I test, approximately 7,000 feet (2133 meters) southeast of the Johnnie Boy site. The survey was conducted in one flight. The completed survey covered a total of 4.0 square miles. The flight lines (with the turns) over the surveyed areas are presented in Figure 1. One 2.5-hour-long flight was performed at an altitude of 100 ft above ground level (AGL) with 200 foot flight-line spacing. A test-line flight was conducted near the Desert Rock Airstrip to ensure quality control of the data. The test line is not shown in Figure 1. However, Figure 1 does include the flight lines for a ''perimeter'' flight. The path traced by the helicopter flying over distinct roads within the survey area can be used to overlay the survey data on a base map or image. The flight survey lines were flown in an east-west orientation perpendicular to the deposition patterns for both sites. This technique provides better spatial resolution when contouring the data. The data were collected by the AMS data acquisition system (REDAR V) using an array of twelve 2-inch x 4-inch x 16-inch sodium iodide (NaI) detectors flown on-board a twin-engine Bell 412 helicopter. Data, in the form of gamma energy spectra, were collected every second over the course of the survey and were geo-referenced using a differential Global Positioning System. Spectral data allows the system to distinguish between ordinary fluctuations in natural background radiation levels and the signature produced by man

  13. Reconnaissance survey of site 7 of the proposed Three Rivers Regional Landfill and Technology Center, Savannah River Site, Aiken County, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Cabak, M.A.; Beck, M.L.; Gillam, C.; Sassaman, K.E.

    1996-02-01

    This report documents the archaeological investigation of Site 7 of the proposed Three Rivers Regional Landfill and Technology Center in Aiken County on the United States Department of Energy`s Savannah River Site (SRS) in Aiken and Barnwell Counties, South Carolina. Pedestrian and subsurface survey techniques were used to investigate the 1,403-acre project area. Survey resulted in the discovery of 23 previously unrecorded sites and 11 occurrences; six previously recorded sites were also investigated. These sites consist of six prehistoric sites, nine historic sites, and 14 sites with both prehistoric and historic components. Sites locations and project area boundaries are provided on a facsimile of a USGS 7.5 topographic map. The prehistoric components consist of very small, low-density lithic and ceramic scatters; most contain less than 10 artifacts. Six of the prehistoric components are of unknown cultural affiliation, the remaining prehistoric sites were occupied predominately in the Woodland period. The historic sites are dominated by postbellum/modem home places of tenant and yeoman farmers but four historic sites were locations of antebellum house sites (38AK136, 38AK613, 38AK660, and 38AK674). The historic sites also include an African-American school (38AK677).

  14. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  15. SURVEY - Multicriteria Models for Just-in-Time Scheduling

    OpenAIRE

    T'Kindt , Vincent

    2010-01-01

    Abstract Just-in-Time manufacturing consists in organizing the production of elements in order to meet a certain number of objectives or requirements according to the so-called ?Just-in-Time philosophy?. Just-in-Time has been extensively studied in the literature for many years due to the high number of real-life situations where it can be applied. This paper aims at revisiting Just-in-Time principles and detailing how they can be applied to the scheduling stage of a manufacturi...

  16. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  17. Conducting a large, multi-site survey about patients’ views on broad consent: challenges and solutions

    Directory of Open Access Journals (Sweden)

    Maureen E. Smith

    2016-11-01

    Full Text Available Abstract Background As biobanks play an increasing role in the genomic research that will lead to precision medicine, input from diverse and large populations of patients in a variety of health care settings will be important in order to successfully carry out such studies. One important topic is participants’ views towards consent and data sharing, especially since the 2011 Advanced Notice of Proposed Rulemaking (ANPRM, and subsequently the 2015 Notice of Proposed Rulemaking (NPRM were issued by the Department of Health and Human Services (HHS and Office of Science and Technology Policy (OSTP. These notices required that participants consent to research uses of their de-identified tissue samples and most clinical data, and allowing such consent be obtained in a one-time, open-ended or “broad” fashion. Conducting a survey across multiple sites provides clear advantages to either a single site survey or using a large online database, and is a potentially powerful way of understanding the views of diverse populations on this topic. Methods A workgroup of the Electronic Medical Records and Genomics (eMERGE Network, a national consortium of 9 sites (13 separate institutions, 11 clinical centers supported by the National Human Genome Research Institute (NHGRI that combines DNA biorepositories with electronic medical record (EMR systems for large-scale genetic research, conducted a survey to understand patients’ views on consent, sample and data sharing for future research, biobank governance, data protection, and return of research results. Results Working across 9 sites to design and conduct a national survey presented challenges in organization, meeting human subjects guidelines at each institution, and survey development and implementation. The challenges were met through a committee structure to address each aspect of the project with representatives from all sites. Each committee’s output was integrated into the overall survey plan. A

  18. Final report on the radiological surveys of designated DX firing sites at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    1996-01-01

    CHEMRAD was contracted by Los Alamos National Laboratory to perform USRADS reg-sign (UltraSonic Ranging And Data System) radiation scanning surveys at designated DX Sites at the Los Alamos National Laboratory. The primary purpose of these scanning surveys was to identify the presence of Depleted Uranium (D-38) resulting from activities at the DX Firing Sites. This effort was conducted to update the most recent surveys of these areas. This current effort was initiated with site orientation on August 12, 1996. Surveys were completed in the field on September 4, 1996. This Executive Summary briefly presents the major findings of this work. The detail survey results are presented in the balance of this report and are organized by Technical Area and Site number in section 2. This organization is not in chronological order. USRADS and the related survey methods are described in section 3. Quality Control issues are addressed in section 4. Surveys were conducted with an array of radiation detectors either mounted on a backpack frame for man-carried use (Manual mode) or on a tricycle cart (RadCart mode). The array included radiation detectors for gamma and beta surface near surface contamination as well as dose rate at 1 meter above grade. The radiation detectors were interfaced directly to an USRADS 2100 Data Pack

  19. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 9, Index

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules.

  20. An aerial radiological survey of the Salmon Site and surrounding area, Lamar County, Mississippi

    International Nuclear Information System (INIS)

    Kernan, W.J.

    1994-05-01

    An aerial radiological survey was conducted over the former Atomic Energy Commission Test Site at the Salmon Site and surrounding area between April 20 and May 1, 1992. The Salmon Site is located in Lamar County, Mississippi, approximately 20 miles southwest of Hattiesburg, Mississippi. The purpose of the survey was to measure and document the gamma-ray environment of the Salmon Site and adjacent lands. A contour map showing gamma radiation exposure rates at 1 meter above ground level was constructed from the aerial data and overlaid on a rectified aerial photograph of the area. The exposure rates within the area are between 5 and 8 μR/h. The reported exposure rates include a cosmic-ray contribution estimated to be 3.7 μR/h. Radionuclide assays of soil samples and in situ measurements, taken with a pressurized ion chamber and a high-purity germanium detector, were obtained at 4 locations within the survey boundaries. These measurements were taken in support of and are in agreement with the aerial data

  1. Geophysical survey at archaeological sites in northeastern Syria

    OpenAIRE

    Mateiciucová, Inna; Milo, Peter; Tencer, Tomáš; Vlach, Marek

    2011-01-01

    From August 25 to September 4, 2008, geophysical surveys were carried out at the Neolithic, Chalcolithic, Bronze and Iron Age tell- and non-tell settlements in the Khabur region in Northeastern Syria (Syrian-Polish-Czech expedition) (Fig. 1). Four sites were prospected: Tell Arbid Abyad, Tell Arbid (West-hill), Khirbet Shane, Khirbet Bezi. The Scintrex Navmag SM-5 – Caesium Magnetometer was used for the measurement of the vertical gradient of the local magnetic field. The measurement resoluti...

  2. Hanford Environmental Monitoring Program schedule for samples, analyses, and measurements for calendar year 1985

    International Nuclear Information System (INIS)

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1984-12-01

    This report provides the CY 1985 schedule of data collection for the routine Hanford Surface Environmental Monitoring and Ground-Water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided herein does not include samples scheduled to be collected during FY 1985 in support of special studies, special contractor support programs, or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in site operations, program requirements, or unusual sample results

  3. Lift scheduling organization : Lift Concept for Lemminkainen

    OpenAIRE

    Mingalimov, Iurii

    2015-01-01

    The purpose of the work was to make a simple schedule for the main contractors and clients to check and control workflow connected with lifts. It gathers works with electricity, construction, engineering networks, installing equipment and commissioning works. The schedule was carried out during working on the building site Aino in Saint Petersburg in Lemminkӓinen. The duration of work was 5 months. The lift concept in Lemminkӓinen is very well controlled in comparison with other buil...

  4. Formerly utilized MED/AEC sites remedial action program. Radiological survey of the former Watertown arsenal property, Site 34 and Site 41, Watertown, Massachusetts

    International Nuclear Information System (INIS)

    Wynveen, R.A.; Smith, W.H.; Sholeen, C.M.; Justus, A.L.; Flynn, K.F.

    1983-10-01

    During the MED/AEC era, work involving radioactive materials was conducted at various sites within the arsenal complex. Building 34 housed a uranium machine shop, and a portion of Building 41 contained a foundry that was used for uranium work. Information provided by site personnel indicated that only depleted uranium was used in these buildings. Results of radiological analyses of contaminated material found at these sites indicated depleted uranium with uranium-236. Both buildings have been razed. The remnants still in place consist of the concrete floor slabs, access drives, and underground utility service trenches. This area is currently under the control of the Watertown Redevelopment Authority of Watertown, Massachusetts. During the period from June 25 through July 1, 1981, the Argonne National Laboratory (ANL), Occupational Health and Safety Division (OHS) Radiological Survey Group (RSG), conducted a radiological survey of Building Sites 34 and 41 at the direction of the US Department of Energy. Significant levels of contamination were found at 33 locations on the pad of Site 34 and in 5 out of 15 soild corings from the perimeter of the pad. No contamination was found on the pad of Site 41; however, two-thirds of this pad was covered with soil up to 4 ft thick. One of the 14 soil corings taken adjacent to the pad of Site 41 had elevated levels of uranium. Levels of contamination in excess of criteria, as identified in ANSI 13.12 and NRC Guidelines, were found at this site. The analyses of the samples from the sewer access points also revealed uranium and radium-226 anomalies. Therefore, according to NRC guidelines dated July 1982, it must be concluded that they are contaminated

  5. Site study plan for ecology, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary Draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Ecology Site Study Plan describes a field program consisting of studies which include surveys for endangered, threatened, and candidate species; vegetation characterization, including mapping and cover typing, plant succession, wetlands description, and preexisting stresses; and wildlife community characterization, including availability and quality of habitats and descriptions of mammal, bird, reptile, amphibian, and invertebrate populations. The plan for each study describes the need for the study, study design, data management and use, schedule and personnel requirements, and quality assurance. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document (SRP-RD). 83 refs., 3 tabs

  6. An aerial radiological survey of the Savannah River Site TNX facility and surrounding area, Aiken, South Carolina

    International Nuclear Information System (INIS)

    1991-06-01

    An aerial radiological survey was conducted over a 3.8-square-kilometer (1.5-square-mile) area, centered on the Savannah River Site (SRS) TNX facility. The survey was flown on July 25, 1986, prior to the Steel Creek Corridor survey. Radiological measurements were used to determine the extent of man-made radionuclides in the TNX area. This survey area had been covered during previous site surveys of the Savannah River Floodplain. Higher than typical levels of thorium-232 daughters were detected in the survey area just west of the TNX facility. The natural terrestrial radiation levels were consistent with those measured during prior surveys of this and other SRS areas. 5 refs., 12 figs., 2 tabs

  7. Site Study Plan for land use, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Land Use Site Study Plan describes a field program consisting of characterization of the site; seismic survey rights-of-way and transportation and utility corridors, the vicinity, the region, future land use, and monitoring land-use change. Aerial photography will be used to characterize the site, seismic rows and transportation and utility corridors, and the vicinity. The resulting land-use maps and overlays will then be verified in the field. Interviews with farm managers and local experts will provide additional information. A Geographic Information System (GIS) and satellite imagery will be used to characterize the region, monitor land-use change, and provide information to assist with the future land use study. The site study plan describes the study design and rationale, the filed data collection procedures and equipment, the data analysis methods and application of results, the data management strategy, the schedule of field activities, the personnel requirements and management of the study, and the study's quality assurance program. The directives and requirements that drive these studies are derived from the Salt Repository Project Requirements Document. 51 refs; 6 figs; 3 tabs

  8. Verification study on technology for site investigation for geological disposal. Confirmation of the applicability of survey methods through establishing site descriptive models in accordance with stepwise investigation approach

    International Nuclear Information System (INIS)

    Kondo, Hirofumi; Suzuki, Koichi; Hasegawa, Takuma; Hamada, Takaomi; Yoshimura, Kimitaka

    2014-01-01

    The Yokosuka Demonstration and Validation Project, which uses the Yokosuka Central Research Institute of Electric Power Industry (CRIEPI) site, a Neogene sedimentary and coastal environment, has been conducted since the 2006 fiscal year as a cooperative research project between NUMO (Nuclear Waste Management Organization of Japan) and CRIEPI. The objectives of this project were to examine and refine the basic methodology of the investigation and assessment in accordance with the conditions of geological environment at each stage of investigations from the surface (Preliminary Investigation and the first half of Detailed Investigation conducted by NUMO) for high level radioactive waste geological disposal. Within investigation technologies at these early stages, a borehole survey is an important means of directly obtaining various properties of the deep geological environment. On the other hand, surface geophysical prospecting data provide information about the geological and resistivity structures at depth for planning borehole surveys. During the 2006-2009 fiscal years, a series of on-site surveys and tests, including borehole surveys of YDP-1 (depth: 350 m) and YDP-2 (depth: 500 m), were conducted in this test site. Furthermore, seismic surveys (including seismic reflection method) and electromagnetic surveys (including magnetotelluric method) were conducted within the expanded CRIEPI site in the 2010 fiscal year to obtain information about the geological structure, and the resistivity structure reflecting the distribution of the salt water/fresh water boundary, respectively, to a depth of over several hundred meters. The validity of existing survey and testing methods for stepwise investigations (from surface to borehole surveys) for obtaining properties of the geological environment (in various conditions relating to differences in the properties of the Miura and the Hayama Groups at this site) was confirmed through establishing site descriptive models based on

  9. Schedule reconciliation tests for management prudency determination

    International Nuclear Information System (INIS)

    Howell, G.E.

    1986-01-01

    The prudency audit of a nuclear project involves engineering, construction, financial, and management dimensions. The audit must retrospectively evaluate the decisions and actions of management decision makers and then equitably allocate the cost impacts of those decisions and actions in a comprehensive and objective manner. In most situations, determination of the impact of schedule delays is a paramount issue. Manzi and Associates uses an approach to schedule reconciliation that focuses on the site-specific, as-built condition. The as-built schedule model is analyzed by a backward pass, or but-for methodology which focuses on the causes and impacts of identified delays. The objective is to demonstrate that but-for the identified delay, the project could have been built in the as-planned time frame. The but-for methodology has been used in many contract dispute cases and is currently being applied to schedule reconciliation on several nuclear plants. The potential for applying this methodology to both new construction and retrofit projects is great

  10. Job scheduling in a heterogenous grid environment

    Energy Technology Data Exchange (ETDEWEB)

    Oliker, Leonid; Biswas, Rupak; Shan, Hongzhang; Smith, Warren

    2004-02-11

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  11. Autonomous scheduling technology for Earth orbital missions

    Science.gov (United States)

    Srivastava, S.

    1982-01-01

    The development of a dynamic autonomous system (DYASS) of resources for the mission support of near-Earth NASA spacecraft is discussed and the current NASA space data system is described from a functional perspective. The future (late 80's and early 90's) NASA space data system is discussed. The DYASS concept, the autonomous process control, and the NASA space data system are introduced. Scheduling and related disciplines are surveyed. DYASS as a scheduling problem is also discussed. Artificial intelligence and knowledge representation is considered as well as the NUDGE system and the I-Space system.

  12. Understanding pathways of exposure using site-specific habits surveys, particularly new pathways and methodologies

    International Nuclear Information System (INIS)

    Grzechnik, M.; McTaggart, K.; Clyne, F.

    2006-01-01

    Full text of publication follows: UK policy on the control of radiation exposure via routine discharges from nuclear licensed sites has long been based on ICRP recommendations that embody the principles of justification of practices, optimisation of protection, and dose limitation. Radiological protection of the public is based on the concept of a critical group of individuals. This group is defined as those people who, as a result of the area they reside and their habits, receive the highest radiation dose due to the operations of a site. Therefore, if the dose to this critical group is acceptable in relation to relevant dose limits and constraints, then other members of the public will receive lower doses. Thus, the principle of critical groups provides overall protection for the public. Surveys to determine local habits involve an integrated methodology, whereby the potential radioactive exposure pathways from liquid and gaseous discharges and direct radiation from the site are investigated. Surveys to identify these habits must be undertaken rigorously for consistency, and have been known to reveal unexpected pathways of radiation exposure. Pathways typically include consumption of local foodstuffs and external exposure. Furthermore, a number of critical groups ma y be identified within a single survey area if the habits of one group do not adequately describe those of the other inhabitants of the area. Survey preparation involves the initial identification of high producers and consumers of local foods in a geographically defined area surrounding the nuclear facility. Pathways can be broken down into three general groups, which include exposure arising from; 1) Terrestrial (gaseous) discharges surveyed within 5 km of the site 2) Direct radiation surveyed within 1 km of the site 3) Aquatic (liquid) discharges surveyed within local areas affected by the discharges, including seas, rivers and sewage works. The survey fieldwork involves interviewing members of the

  13. How do employees prioritise when they schedule their own shifts?

    DEFF Research Database (Denmark)

    Nabe-Nielsen, Kirsten; Lund, Henrik; Hansen, Åse Marie

    2013-01-01

    to their family life, having consecutive time off, leisure-time activities, rest between shifts, sleep, regularity of their everyday life, health and that the work schedule balanced. Thus, employees consider both their own and the workplace's needs when they have the opportunity to schedule their own shifts. Age......We investigated how employees prioritised when they scheduled their own shifts and whether priorities depended on age, gender, educational level, cohabitation and health status. We used cross-sectional questionnaire data from the follow-up survey of an intervention study investigating the effect...... of self-scheduling (n = 317). Intervention group participants were asked about their priorities when scheduling their own shifts succeeded by 17 items covering family/private life, economy, job content, health and sleep. At least half of the participants reported that they were giving high priority...

  14. Post-precipitation bias in band-tailed pigeon surveys conducted at mineral sites

    Science.gov (United States)

    Overton, C.T.; Schmitz, R.A.; Casazza, Michael L.

    2005-01-01

    Many animal surveys to estimate populations or index trends include protocol prohibiting counts during rain but fail to address effects of rainfall preceding the count. Prior research on Pacific Coast band-tailed pigeons (Patagioenas fasciata monilis) documented declines in use of mineral sites during rainfall. We hypothesized that prior precipitation was associated with a short-term increase in use of mineral sites following rain. We conducted weekly counts of band-tailed pigeons at 19 Pacific Northwest mineral sites in 2001 and 20 sites in 2002. Results from regression analysis indicated higher counts ???2 days after rain (11.31??5.00% [x????SE]) compared to ???3 days. Individual index counts conducted ???2 days after rain were biased high, resulting in reduced ability to accurately estimate population trends. Models of band-tailed pigeon visitation rates throughout the summer showed increased mineral-site counts during both June and August migration periods, relative to the July breeding period. Our research supported previous studies recommending that mineral-site counts used to index the band-tailed pigeon population be conducted during July. We further recommend conducting counts >3 days after rain to avoid weather-related bias in index estimation. The design of other population sampling strategies that rely on annual counts should consider the influence of aberrant weather not only coincident with but also preceding surveys if weather patterns are thought to influence behavior or detection probability of target species.

  15. Radiological walkover survey at the site of the world's first nuclear reactor using the NAVSTAR global positioning system

    International Nuclear Information System (INIS)

    Sims, J.; Barry, C.; Efird, C.

    1994-01-01

    A radiological walkover survey was conducted by Bechtel National, Inc. (BNI) in the spring of 1994 at Site A, the site of the world's first nuclear reactor pilot plant facility. The objective of this survey was to provide comprehensive information regarding surface radiation levels to support identification and documentation of unknown contaminated areas and selection of future sample locations, and provide information for health and safety coverage during field investigations. The technique used represented a new application integrating the radiation measuring instrumentation with the global positioning system (GPS) in real-time differential mode. The integrated mapping and radiation survey system (MARSS) developed by J.S. Bland Associates, Inc. (JSB) simultaneously recorded direct radiation, exposure rate, and position data. Site A is in the Palos Forest Preserve, about 20 miles southwest of downtown Chicago, Illinois. The topography of the site is relatively flat (usually less than 5 % grade), with a maximum grade of 10%. Prior to the survey, the site was staked on 100-ft. centers and roughly 75% of the site was cleared of dense vegetation including trees less than 6 in. in diameter. The survey covered approximately 2 acres each day, including background determinations, source checks, calibrations, and downloading of integrated position data and radiological measurements

  16. Finding and evaluating potential radiological problems in the vicinity of uranium milling sites

    International Nuclear Information System (INIS)

    Goldsmith, W.A.; Yates, W.G.

    1982-01-01

    The Oak Ridge National Laboratory (ORNL) has been performing radiological surveys at former uranium and thorium milling and processing sites since 1975. Tailings at inactive milling sites usually have a low frequency of human occupancy but continuously generate 222 Rn into the atmosphere. Thus, independent 222 Rn surveys are conducted at the inactive mill sites and their environs by the Mound Facility. Measurements of airborne 222 Rn and 222 Rn flux are made on the sites to define the tailings source term. Concurrently with these measurements, an ambient 222 Rn monitoring network is established off-site and a meteorological station is established at or near the mill site. Unfortunately, tailings are not always confined to the milling site. Radioactivity can migrate to areas outside of site boundaries by wind and water erosion, groundwater transport, spillage of incoming ore, and removal of tailings or other material for private purposes. In order to identify and assess off-site radioactivity on properties in the vicinity of milling sites, a combination of aerial and ground-level radiological monitoring techniques are used. The ground mobile gamma-ray scan is conducted using a vehicle equipped with sensitive gamma-ray detectors. The detectors are shielded so that gamma radiation input is viewed through only one side of the vehicle. This system is capable of precisely locating properties which have anomalously high gamma radiation levels caused by the presence of tailings. Subsequently, these properties are identified as candidate vicinity properties and are scheduled for radiological surveys subject to the property owner's consent. The comprehensive radiological surveys conducted at these vicinity properties determine the amount, type, and location of tailings materials

  17. Food surveys for assessing chemical and dosimetric impacts near industrial sites

    International Nuclear Information System (INIS)

    Parache, V.; Maurau, S.; Mercat, C.

    2011-01-01

    Estimating the ingestion of potentially contaminated foodstuffs around conventional and nuclear industrial sites requires data about the food practices and eating habits of the local residents, especially the consumption of locally- and home-produced food. The IRSN thus chose to conduct surveys about these practices in the vicinity of nuclear sites. Their methodology was based on previous surveys near nuclear sites. In 2004, in partnership with AREVA and BEGEAT, the French Institute for Radioprotection and Nuclear Safety studied the eating habits of the residents of Bollene, near the Tricastin plant (Rhone Valley), with the aim of improving the quantification of the plant's potential health impacts. Based on these studies and as part of the SENSIB project to characterize vulnerability to nuclear risks, we developed and tested a survey protocol during the summer 2008, around the Chinon nuclear plant, in collaboration with EDF. The protocol is currently being tested around the Marcoule nuclear plant, in collaboration with the CEA. The aim was to optimize the feasibility and the reproducibility of the approach, while losing none of the robustness of the results. The data obtained made it possible to evaluate daily food intake values for individuals and to assess the rates of consumption of locally-grown products for many food categories. The data showed the existence of local population groups with very high rates of locally-grown food consumption - over 90 % of certain food products. This comparative study thus shows the significant variability of eating habits in the French population and proposes a reproducible approach to evaluating realistic indicators of potentially risky dietary habits. (authors)

  18. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicle driving schedules

    International Nuclear Information System (INIS)

    Cardoso, G.; Stadler, M.; Bozchalui, M.C.; Sharma, R.; Marnay, C.; Barbosa-Póvoa, A.; Ferrão, P.

    2014-01-01

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem. - Highlights: • This paper introduces a new EV aggregator model in the DER-CAM model and expands it with a stochastic formulation. • The model is used to analyze the impact of EVs in DER investment decisions in a large office building. • The uncertainty in EV driving patterns is considered through scenarios based on data from a daily commute driving survey. • Results indicate that EVs have a significant impact in optimal DER decisions, particularly when looking at short payback periods. • Furthermore, results indicate that uncertainty in EV driving schedules has little impact on DER investment decisions

  19. Is There a Downside to Schedule Control for the Work-Family Interface?

    Science.gov (United States)

    Schieman, Scott; Young, Marisa

    2010-01-01

    Using data from a 2007 U.S. survey of workers, this article examines the implications of schedule control for work-family role blurring and work-family conflict. Four main findings indicate that (a) schedule control is associated with more frequent working at home and work-family multitasking activities; (b) the positive association between…

  20. Manual on quality assurance for the survey, evaluation and confirmation of nuclear power plant sites

    International Nuclear Information System (INIS)

    1987-04-01

    The present Manual on Quality Assurance for the Survey, Evaluation and Confirmation of Nuclear Power Plant Sites contains supporting material and illustrates examples for implementing the requirements contained in the Code of Practice on Quality Assurance for Safety in Nuclear Power Plants to the activities of survey, evaluation and confirmation of nuclear power plant sites. At the same time the Code of Practice for Safety in Nuclear Power Plant Siting, and Safety Guides in the siting series contain requirements and recommendations to implement a quality assurance programme in selected activities of the siting process. This manual is intended to provide guidance and illustrate examples on this implementation. During preparation and reviews of this Manual it was found out that the methodology of implementation of the quality assurance programme in siting activities is still under development. For these reasons it was considered appropriate to publish this Manual as a temporary publication for trial use

  1. Results of the radiological survey at the former Heppenstall Company site, 4620 Hatfield Street, Pittsburgh, Pennsylvania

    International Nuclear Information System (INIS)

    Cottrell, W.D.; Crutcher, J.W.; Quillen, J.L.

    1991-01-01

    As part of the Formerly Utilized Sites Remedial Action Program, the US Department of Energy (DOE) is implementing a program to determine the radiological conditions at sites that were used to process radioactive materials under contract with the department's predecessor agencies. During 1955 the former Heppenstall Company site in Pittsburgh, Pennsylvania, was used by an Atomic Energy Commission contractor to process approximately 100,000 lbs of normal uranium metal. Because of insufficient records to document cleanup procedures and to verify the radiological condition of this site, DOE requested a survey. The radiological survey discussed in this report for the site of the former Heppenstall Company, Pittsburgh, Pennsylvania, was conducted by members of the Measurement Applications and Development Group of Oak Ridge National Laboratory in July of 1989. The survey included a surface gamma scan of the warehouse, collection of indoor soil and dust samples and one outdoor sample, and measurement of direct and transferable alpha and beta-gamma activity. Results of this radiological assessment indicate no detection of radiation levels or radionuclide concentrations above DOE guidelines. 7 refs., 5 figs., 3 tabs

  2. Acquisition Information Management system telecommunication site survey results

    Energy Technology Data Exchange (ETDEWEB)

    Hake, K.A. [Oak Ridge National Lab., TN (United States); Key, B.G. [COR, Inc., Oak Ridge, TN (United States)

    1993-09-01

    The Army acquisition community currently uses a dedicated, point-to-point secure computer network for the Army Material Plan Modernization (AMPMOD). It must transition to the DOD supplied Defense Secure Network 1 (DSNET1). This is one of the first networks of this size to begin the transition. The type and amount of computing resources available at individual sites may or may not meet the new network requirements. This task surveys these existing telecommunications resources available in the Army acquisition community. It documents existing communication equipment, computer hardware, associated software, and recommends appropriate changes.

  3. Psychometric Properties of Farsi Version of the Revised Fear Survey Schedule for Children.

    Science.gov (United States)

    Abdekhodaie, Ehsan; Arghabaei, Mohammad; Bahrami Ehsan, Hadi

    2016-02-18

    This study examined the psychometric properties of the Farsi version of the Revised Fear Survey Schedule for Children (Ollendick, 1983), namely the FSSC-FA, in a sample of Iranian children and adolescents (N = 394, 206 girls) aged 9-11:11 years. The internal consistency coefficient was found to range from .79 to .96 for total and subscale scores. The authors used exploratory and confirmatory factor analyses to determine the factor structure of the FSSC-FA. The results showed that a 71-item, six-factor model provided a satisfactory fit for the structure of the FSSC-FA (RMSEA = .07, 90% CIs [.068, .072], CFI = .94, NNFI = .94, χ2/df = 2.94). With regard to gender and age differences in fears of the present sample, girls typically reported more fears than boys (Cohen's d = .28, 95% CIs [.08, .48], p fears in the sample which were very similar to those reported by other studies except one item being specific to the Iranian population. Bearing in mind the limitations discussed, the results generally show that the FSSC-FA scores are valid and reliable to assess fears in Iranian youth.

  4. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  5. Site Study Plan for background environmental radioactivity, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Background Environmental Radioactivity Site Study Plan describes a field program consisting of an initial radiological survey and a radiological sampling program. The field program includes measurement of direct radiation and collection and analysis of background radioactivity samples of air, precipitation, soil, water, milk, pasture grass, food crops, meat, poultry, game, and eggs. The plan describes for each study: the need for the study, the study design, data management and use, schedule of proposed activities, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project (SRP) Requirements Document. 50 refs., 11 figs., 7 tabs

  6. Master schedule for CY-1979 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Houston, J.R.; Eddy, P.A.

    1978-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site, as conducted by the Environmental Evaluation Section of Battelle, Pacific Northwest Laboratory for the Department of Energy (DOE), is given. Modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, and to monitor Hanford operations for compliance with applicable environmental criteria and Washington State Water Quality Standards. Air quality data are obtained in a separate program administered by the Hanford Environmental Health Foundation. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Water quality data for Hanford Site potable water systems are published each year by the Hanford Environmental Health Foundation. The data collected are available in routine reports issued by the Environmental Evaluations staff. Groundwater data and evaluation are reported in the series, ''Radiological Status of the Groundwater Beneath the Hanford Project for...,'' the latest issue being PNL-2624 for CY-1977. Data from locations within the plant boundaries are presented in the annual ''Environmental Status of the Hanford Site for...'' report series, the most recent report being PNL-2677 for 1977. Data from offsite locations are presented in the annual ''Environmental Surveillance at Hanford for...'' series of reports, the latest being PNL-2614 for 1977

  7. Scheduling in Heterogeneous Grid Environments: The Effects of DataMigration

    Energy Technology Data Exchange (ETDEWEB)

    Oliker, Leonid; Biswas, Rupak; Shan, Hongzhang; Smith, Warren

    2004-01-01

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this goal can be fully realized. One problem critical to the effective utilization of computational grids is efficient job scheduling. Our prior work addressed this challenge by defining a grid scheduling architecture and several job migration strategies. The focus of this study is to explore the impact of data migration under a variety of demanding grid conditions. We evaluate our grid scheduling algorithms by simulating compute servers, various groupings of servers into sites, and inter-server networks, using real workloads obtained from leading supercomputing centers. Several key performance metrics are used to compare the behavior of our algorithms against reference local and centralized scheduling schemes. Results show the tremendous benefits of grid scheduling, even in the presence of input/output data migration - while highlighting the importance of utilizing communication-aware scheduling schemes.

  8. Results of the preliminary radiological survey at the former Diamond Magnesium Company site, Luckey, Ohio (DML001)

    International Nuclear Information System (INIS)

    Foley, R.D.; Crutcher, J.W.

    1990-02-01

    As part of the Formerly Utilized Sites Remedial Action Program, the US Department of Energy (DOE) is implementing a radiological survey program to determine the radiological conditions at sites that were used by the department's predecessor agencies. One such site is the former Diamond Magnesium Company facility in Luckey, Ohio. The preliminary radiological survey discussed in this report was conducted at the request of DOE by members of the Measurement Applications and Development group of Oak Ridge National Laboratory in December 1988. The former Diamond Magnesium Company site in Luckey, Ohio, was used as a magnesium reduction plant during World War 2. It was closed in 1945 and reopened in 1949 as a beryllium production facility, operated by Brush Wellman for the US Atomic Energy Commission. The preliminary radiological survey included: a surface gamma scan of part of the property outdoors, collection of surface and subsurface soil samples, and collection of water samples. Laboratory analysis of soil samples showed concentrations of 226 Ra in excess of applicable DOE guidelines. A follow-up, detailed survey is recommended. 9 refs., 10 figs., 4 tabs

  9. Residency Applicants Prefer Online System for Scheduling Interviews

    Directory of Open Access Journals (Sweden)

    Wills, Charlotte

    2015-03-01

    Full Text Available Introduction: Residency coordinators may be overwhelmed when scheduling residency interviews. Applicants often have to coordinate interviews with multiple programs at once, and relying on verbal or email confirmation may delay the process. Our objective was to determine applicant mean time to schedule and satisfaction using online scheduling. Methods: This pilot study is a retrospective analysis performed on a sample of applicants offered interviews at an urban county emergency medicine residency. Applicants were asked their estimated time to schedule with the online system compared to their average time using other methods. In addition, they were asked on a five-point anchored scale to rate their satisfaction. Results: Of 171 applicants, 121 completed the survey (70.8%. Applicants were scheduling an average of 13.3 interviews. Applicants reported scheduling interviews using the online system in mean of 46.2 minutes (median 10, range 1-1800 from the interview offer as compared with a mean of 320.2 minutes (median 60, range 3-2880 for other programs not using this system. This difference was statistically significant. In addition, applicants were more likely to rate their satisfaction using the online system as “satisfied” (83.5% vs 16.5%. Applicants were also more likely to state that they preferred scheduling their interviews using the online system rather than the way other programs scheduled interviews (74.2% vs 4.1% and that the online system aided them coordinating travel arrangements (52.1% vs 4.1%. Conclusion: An online interview scheduling system is associated with higher satisfaction among applicants both in coordinating travel arrangements and in overall satisfaction. [West J Emerg Med. 2015;16(2:352-354.

  10. How do employees prioritise when they schedule their own shifts?

    Science.gov (United States)

    Nabe-Nielsen, Kirsten; Lund, Henrik; Ajslev, Jeppe Z; Hansen, Åse Marie; Albertsen, Karen; Hvid, Helge; Garde, Anne Helene

    2013-01-01

    We investigated how employees prioritised when they scheduled their own shifts and whether priorities depended on age, gender, educational level, cohabitation and health status. We used cross-sectional questionnaire data from the follow-up survey of an intervention study investigating the effect of self-scheduling (n = 317). Intervention group participants were asked about their priorities when scheduling their own shifts succeeded by 17 items covering family/private life, economy, job content, health and sleep. At least half of the participants reported that they were giving high priority to their family life, having consecutive time off, leisure-time activities, rest between shifts, sleep, regularity of their everyday life, health and that the work schedule balanced. Thus, employees consider both their own and the workplace's needs when they have the opportunity to schedule their own shifts. Age, gender, cohabitation and health status were all significantly associated with at least one of these priorities. Intervention studies report limited health effects of self-scheduling. Therefore, we investigated to what extent employees prioritise their health and recuperation when scheduling their own shifts. We found that employees not only consider both their health and family but also the workplace's needs when they schedule their own shifts.

  11. Comprehensive engineering and radiological survey of the Bochvar VNIINM site

    International Nuclear Information System (INIS)

    Bazhanov, M.S.; Belousov, S.V.; Grishin, E.Zh.; Kotov, A.L.; Kuznetsov, A.Yu.; Savin, S.K.; Sukhanov, L.P.; Chernikov, M.A.; Utrobin, D.V.

    2012-01-01

    The comprehensive engineering and radiological survey (CERS) of Bochvar VNIINM war performed in 2010-2012. During the performance of the survey, radiometric measurements were taken to determine the total activity of α-emitting radionuclides in the air of work rooms, gas releases and in the environment, α- and β-emitting radionuclides in the air of work rooms, air releases from the site, waste waters, samples of snow, soil and vegetation, and in process oils. As a result of the work, experience was obtained in performing CERS of buildings and territory, standardized CERS programmes were developed, essential information was collected about radioactive contamination of both buildings and territory of the Bochvar VNIINM [ru

  12. Deep-towed CSEM survey of gas hydrates in the Gulf of Mexico

    Science.gov (United States)

    Kannberg, P.; Constable, S.

    2017-12-01

    Controlled source electromagnetic (CSEM) surveys are increasingly being used to remotely detect hydrate deposits in seafloor sediments. CSEM methods are sensitive to sediment pore space resistivity, such as when electrically resistive hydrate displaces the electrically conductive pore fluid, increasing the bulk resistivity of the sediment. In July 2017, a two-week research cruise using an upgraded and expanded "Vulcan" towed receiver system collected over 250 line km of data at four sites in the Gulf of Mexico (GoM) thought to have hydrate bearing sediments. Hydrate bearing horizons at the survey sites ranged from 400-700 m below seafloor. Modeling suggested an array with source receiver offsets of up to 1600 m would be needed to properly image the deep hydrate. A deep towed electromagnetic transmitter outputting 270 Amps was towed 100 m above seafloor. Six Vulcan receivers, each recording three-axis electric field data, were towed at 200 m intervals from 600-1600 m behind the transmitter. The four sites surveyed, Walker Ridge 313, Orca Basin, Mad Dog, and Green Canyon 955, are associated with the upcoming GOM^2 coring operation scheduled for 2020. Wells at WR313 and GC955 were logged as part of a joint industry drilling project in 2009 and will be used to ground truth our inversion results. In 2008, WR313 and GC955 were surveyed using traditional CSEM seafloor receivers, accompanied by a single prototype Vulcan towed receiver. This prior survey will allow comparison of results from a seafloor receiver survey with those from a towed receiver survey. Seismic data has been collected at all the sites, which will be used to constrain inversions. In addition to the four hydrate sites surveyed, two lines were towed over Green Knoll, a deep-water salt dome located between Mad Dog and GC955. Presented here are initial results from our recent cruise.

  13. CMS readiness for multi-core workload scheduling

    Science.gov (United States)

    Perez-Calero Yzquierdo, A.; Balcas, J.; Hernandez, J.; Aftab Khan, F.; Letts, J.; Mason, D.; Verguilov, V.

    2017-10-01

    In the present run of the LHC, CMS data reconstruction and simulation algorithms benefit greatly from being executed as multiple threads running on several processor cores. The complexity of the Run 2 events requires parallelization of the code to reduce the memory-per- core footprint constraining serial execution programs, thus optimizing the exploitation of present multi-core processor architectures. The allocation of computing resources for multi-core tasks, however, becomes a complex problem in itself. The CMS workload submission infrastructure employs multi-slot partitionable pilots, built on HTCondor and GlideinWMS native features, to enable scheduling of single and multi-core jobs simultaneously. This provides a solution for the scheduling problem in a uniform way across grid sites running a diversity of gateways to compute resources and batch system technologies. This paper presents this strategy and the tools on which it has been implemented. The experience of managing multi-core resources at the Tier-0 and Tier-1 sites during 2015, along with the deployment phase to Tier-2 sites during early 2016 is reported. The process of performance monitoring and optimization to achieve efficient and flexible use of the resources is also described.

  14. CMS Readiness for Multi-Core Workload Scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Calero Yzquierdo, A. [Madrid, CIEMAT; Balcas, J. [Caltech; Hernandez, J. [Madrid, CIEMAT; Aftab Khan, F. [NCP, Islamabad; Letts, J. [UC, San Diego; Mason, D. [Fermilab; Verguilov, V. [CLMI, Sofia

    2017-11-22

    In the present run of the LHC, CMS data reconstruction and simulation algorithms benefit greatly from being executed as multiple threads running on several processor cores. The complexity of the Run 2 events requires parallelization of the code to reduce the memory-per- core footprint constraining serial execution programs, thus optimizing the exploitation of present multi-core processor architectures. The allocation of computing resources for multi-core tasks, however, becomes a complex problem in itself. The CMS workload submission infrastructure employs multi-slot partitionable pilots, built on HTCondor and GlideinWMS native features, to enable scheduling of single and multi-core jobs simultaneously. This provides a solution for the scheduling problem in a uniform way across grid sites running a diversity of gateways to compute resources and batch system technologies. This paper presents this strategy and the tools on which it has been implemented. The experience of managing multi-core resources at the Tier-0 and Tier-1 sites during 2015, along with the deployment phase to Tier-2 sites during early 2016 is reported. The process of performance monitoring and optimization to achieve efficient and flexible use of the resources is also described.

  15. Impact of flexible scheduling on employee performance regarding stress and work-family conflict

    OpenAIRE

    Raja Abdul Ghafoor Khan; Furqan Ahmad Khan; Dr. Muhammad Aslam Khan; Mohsin Shakeel

    2011-01-01

    Stress, work-family conflicts and flexible scheduling are three of the most important elements in organizational studies. The focus of current study is to understand the effect of Stress,work family conflicts and flexible scheduling on employee’s performance and also to understand whether flexible scheduling helps in reducing stress and work-family conflicts or not. The back bone of this study is the secondary data comprised of comprehensive literature review. A survey has also been conducted...

  16. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  17. Site study plan for borehole search and characterization, Deaf Smith County Site, Texas: Revision 1

    International Nuclear Information System (INIS)

    1987-01-01

    This site study plan describes the Borehole Search and Characterization field activities to be conducted during the early stages of Site Characterization at the Deaf Smith County site, Texas. The field program has been designed to provide data useful in addressing information/data needs resulting from Federal/State/Local regulatory requirements and repository program requirements. Air and ground surveys, an extensive literature search, and landowner interviews will be conducted to locate wells within and adjacent to the proposed nuclear waste repository site in Deaf Smith County. Initially, the study will center around the planned Exploratory Shaft Facilities location and will expand outward from that location. Findings from this study may lead to preparation of a new site study plan to search suspected borehole locations, and excavate or reenter known boreholes for additional characterization or remedial action. The Salt Repository Project (SRP) Networks specify the schedule under which the program will operate. The Technical Field Services Contractor (TFSC) is responsible for conducting the field program. Data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 13 refs., 6 figs., 3 tabs

  18. Computer-aided resource planning and scheduling for radiological services

    Science.gov (United States)

    Garcia, Hong-Mei C.; Yun, David Y.; Ge, Yiqun; Khan, Javed I.

    1996-05-01

    There exists tremendous opportunity in hospital-wide resource optimization based on system integration. This paper defines the resource planning and scheduling requirements integral to PACS, RIS and HIS integration. An multi-site case study is conducted to define the requirements. A well-tested planning and scheduling methodology, called Constrained Resource Planning model, has been applied to the chosen problem of radiological service optimization. This investigation focuses on resource optimization issues for minimizing the turnaround time to increase clinical efficiency and customer satisfaction, particularly in cases where the scheduling of multiple exams are required for a patient. How best to combine the information system efficiency and human intelligence in improving radiological services is described. Finally, an architecture for interfacing a computer-aided resource planning and scheduling tool with the existing PACS, HIS and RIS implementation is presented.

  19. Hybrid IP/CP Methods for Solving Sports Scheduling Problems

    DEFF Research Database (Denmark)

    Rasmussen, Rasmus Vinther

    2006-01-01

    The field of sports scheduling comprises a challenging research areawith a great variety of hard combinatorial optimization problems andchallenging practical applications. This dissertation gives acomprehensive survey of the area and a number of new contributionsare presented. First a general sol...

  20. Integrated Campaign Probabilistic Cost, Schedule, Performance, and Value for Program Office Support

    Science.gov (United States)

    Cornelius, David; Sasamoto, Washito; Daugherty, Kevin; Deacon, Shaun

    2012-01-01

    This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a series of planned space-based missions, or campaign. Originally designed as an aid in planning the execution of missions to accomplish the National Research Council 2007 Earth Science Decadal Survey, it utilizes Monte Carlo simulation of a series of space missions for assessment of resource requirements and expected return on investment. Interactions between simulated missions are incorporated, such as competition for launch site manifest, to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.

  1. Homework schedule: an important factor associated with shorter sleep duration among Chinese school-aged children.

    Science.gov (United States)

    Li, Shenghui; Yang, Qian; Chen, Zhe; Jin, Xingming; Jiang, Fan; Shen, Xiaoming

    2014-09-03

    This study was designed to examine the hypothesis that homework schedule has adverse impacts on Chinese children's sleep-wake habits and sleep duration. A random sample of 19,299 children aged 5.08 to 11.99 years old participated in a large, cross-sectional survey. A parent-administered questionnaire was completed to quantify children's homework schedule and sleep behaviors. Generally, it was demonstrated that more homework schedule was significantly associated with later bedtime, later wake time, and shorter sleep duration. Among all sleep variables, bedtime and sleep duration during weekdays appeared to be most affected by homework schedule, especially homework schedule during weekdays.

  2. 2016 Annual Inspection and Radiological Survey Results for the Piqua, Ohio, Decommissioned Reactor Site, July 2016

    Energy Technology Data Exchange (ETDEWEB)

    Zimmerman, Brian [USDOE Office of Legacy Management, Washington, DC (United States); Miller, Michele [Navarro Research and Engineering, Oak Ridge, TN (United States)

    2016-07-01

    This report presents the findings of the annual inspection and radiological survey of the Piqua, Ohio, Decommissioned Reactor Site (site). The decommissioned nuclear power demonstration facility was inspected and surveyed on April 15, 2016. The site, located on the east bank of the Great Miami River in Piqua, Ohio, was in fair physical condition. There is no requirement for a follow-up inspection, partly because City of Piqua (City) personnel participated in a March 2016 meeting to address reoccurring safety concerns. Radiological survey results from 104 locations revealed no removable contamination. One direct beta activity reading in a floor drain on the 56-foot level (1674 disintegrations per minute [dpm]/100 square centimeters [cm2]) exceeded the minimum detectable activity (MDA). Beta activity has been detected in the past at this floor drain. The reading was well below the action level of 5000 dpm/100 cm2.

  3. CARMENES instrument control system and operational scheduler

    Science.gov (United States)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    The main goal of the CARMENES instrument is to perform high-accuracy measurements of stellar radial velocities (1m/s) with long-term stability. CARMENES will be installed in 2015 at the 3.5 m telescope in the Calar Alto Observatory (Spain) and it will be equipped with two spectrographs covering from the visible to the near-infrared. It will make use of its near-IR capabilities to observe late-type stars, whose peak of the spectral energy distribution falls in the relevant wavelength interval. The technology needed to develop this instrument represents a challenge at all levels. We present two software packages that play a key role in the control layer for an efficient operation of the instrument: the Instrument Control System (ICS) and the Operational Scheduler. The coordination and management of CARMENES is handled by the ICS, which is responsible for carrying out the operations of the different subsystems providing a tool to operate the instrument in an integrated manner from low to high user interaction level. The ICS interacts with the following subsystems: the near-IR and visible channels, composed by the detectors and exposure meters; the calibration units; the environment sensors; the front-end electronics; the acquisition and guiding module; the interfaces with telescope and dome; and, finally, the software subsystems for operational scheduling of tasks, data processing, and data archiving. We describe the ICS software design, which implements the CARMENES operational design and is planned to be integrated in the instrument by the end of 2014. The CARMENES operational scheduler is the second key element in the control layer described in this contribution. It is the main actor in the translation of the survey strategy into a detailed schedule for the achievement of the optimization goals. The scheduler is based on Artificial Intelligence techniques and computes the survey planning by combining the static constraints that are known a priori (i.e., target

  4. Recruiting migrants for health research through social network sites: an online survey among chinese migrants in australia.

    Science.gov (United States)

    Hu, Jie; Wong, Kam Cheong; Wang, Zhiqiang

    2015-04-27

    Traditionally, postal surveys or face to face interviews are the main approaches for health researchers to obtain essential research data. However, with the prevalence of information technology and Internet, Web-based surveys are gaining popularity in health research. This study aims to report the process and outcomes of recruiting Chinese migrants through social network sites in Australia and to examine the sample characteristics of online recruitment by comparing the sample which was recruited by an online survey to a sample of Australian Chinese migrants collected by a postal survey. Descriptive analyses were performed to describe and compare the process and outcomes of online recruitment with postal survey questionnaires. Chi square tests and t tests were performed to assess the differences between the two samples for categorical and continuous variables respectively. In total, 473 Chinese migrants completed the online health survey from July to October 2013. Out of 426 participants recruited through the three Chinese social network sites in Australia, over 86.6% (369/426) were recruited within six weeks. Participants of the Web-based survey were younger, with a higher education level or had resided in Australia for less time compared to those recruited via a postal survey. However, there was no significant difference in gender, marital status, and professional occupation. The recruitment of Chinese migrants through social network sites in our online survey was feasible. Compared to a postal survey of Chinese migrants, the online survey attracted different group of Chinese migrants who may have diverse health needs and concerns. Our findings provided insightful information for researchers who are considering employing a Web-based approach to recruit migrants and ethnic minority participants.

  5. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  6. Fiscal year 1992 report on archaeological surveys of the 100 Areas, Hanford Site, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Wright, M.K.

    1993-09-01

    During FY 1992, the Hanford Cultural Resources Laboratory (HCRL) conducted a field survey of the 100-HR-3 Operable Unit (600 Area) and tested three sites near the 100 Area reactor compounds on the US Department of Energy`s Hanford Site at the request of Westinghouse Hanford Company. These efforts were conducted in compliance with Section 106 of the National Historic Preservation Act (NHPA) and are part of a cultural resources review of 100 Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) operable units in support of CERCLA characterization studies.The results of the FY 1992 survey and test excavation efforts are discussed in this report. 518 ha in the 100-HR-3 Operable Unit and conducted test excavations at three prehistoric sites near the 100-F and 100-K reactors to determine their eligibility for listing on the National Register of Historic Places.

  7. Nuclear Energy Center Site Survey, 1975. Part I. Summary and conclusions

    International Nuclear Information System (INIS)

    1976-01-01

    The Nuclear Energy Center Site Survey is a study of a potential siting approach for projected power and fuel-cycle facilities that would cluster sizable groups of such facilities on a relatively small number of sites, as contrasted with current dispersed siting practices. Three basic types of nuclear energy centers (NECs) are considered: power-plant centers, involving ten to forty units of 1200-megawatt electric capacity each; fuel-cycle centers, involving fuel reprocessing plants, mixed-oxide fuel fabrication facilities, and high-level and transuranic radioactive waste management facilities, with a capacity corresponding to the fuel throughput of power plants with a total capacity of approximately 50,000 to 300,000 MWe; and combined centers, containing both power plants and fuel cycle facilities in representative possible combinations. Included among the principal issues considered in evaluation of feasibility of nuclear energy centers are dissipation of the waste heat from the power-generating facilities; transmission system design, reliability, and economics; radiological impact; and environmental impact

  8. Seismic imaging for an ocean drilling site survey and its verification in the Izu rear arc

    Science.gov (United States)

    Yamashita, Mikiya; Takahashi, Narumi; Tamura, Yoshihiko; Miura, Seiichi; Kodaira, Shuichi

    2018-01-01

    To evaluate the crustal structure of a site proposed for International Ocean Discovery Program drilling, the Japan Agency for Marine-Earth Science and Technology carried out seismic surveys in the Izu rear arc between 2006 and 2008, using research vessels Kaiyo and Kairei. High-resolution dense grid surveys, consisting of three kinds of reflection surveys, generated clear seismic profiles, together with a seismic velocity image obtained from a seismic refraction survey. In this paper, we compare the seismic profiles with the geological column obtained from the drilling. Five volcaniclastic sedimentary units were identified in seismic reflection profiles above the 5 km/s and 6 km/s contours of P-wave velocity obtained from the velocity image from the seismic refraction survey. However, some of the unit boundaries interpreted from the seismic images were not recognised in the drilling core, highlighting the difficulties of geological target identification in volcanic regions from seismic images alone. The geological core derived from drilling consisted of seven lithological units (labelled I to VII). Units I to V were aged at 0-9 Ma, and units VI and VII, from 1320-1806.5 m below seafloor (mbsf) had ages from 9 to ~15 Ma. The strong heterogeneity of volcanic sediments beneath the drilling site U1437 was also identified from coherence, calculated using cross-spectral analysis between grid survey lines. Our results suggest that use of a dense grid configuration is important in site surveys for ocean drilling in volcanic rear-arc situations, in order to recognise heterogeneous crustal structure, such as sediments from different origins.

  9. Interpretation of Ground Penetrating Radar data at the Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Bergstrom, K.A.; Mitchell, T.H.; Kunk, J.R.

    1993-07-01

    Ground Penetrating Radar (GPR) is being used extensively during characterization and remediation of chemical and radioactive waste sites at the Hanford Site in Washington State. Time and money for GPR investigations are often not included during the planning and budgeting phase. Therefore GPR investigations must be inexpensive and quick to minimize impact on already established budgets and schedules. An approach to survey design, data collection, and interpretation has been developed which emphasizes speed and budget with minimal impact on the integrity of the interpretation or quality of the data. The following simple rules of thumb can be applied: (1) Assemble as much pre-survey information as possible, (2) Clearly define survey objectives prior to designing the survey and determine which combination of geophysical methods will best meet the objectives, (3) Continuously communicate with the client, before, during and after the investigation, (4) Only experienced GPR interpreters should acquire the field data, (5) Use real-time monitoring of the data to determine where and how much data to collect and assist in the interpretation, (6) Always ''error'' in favor of collecting too much data, (7) Surveys should have closely spaced (preferably 5 feet, no more than 10 feet), orthogonal profiles, (8) When possible, pull the antenna by hand

  10. Interpretation of Ground Penetrating Radar data at the Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Bergstrom, K.A.; Mitchell, T.H.; Kunk, J.R.

    1993-07-01

    Ground Penetrating Radar (GPR) is being used extensively during characterization and remediation of chemical and radioactive waste sites at the Hanford Site in Washington State. Time and money for GPR investigations are often not included during the planning and budgeting phase. Therefore GPR investigations must be inexpensive and quick to minimize impact on already established budgets and schedules. An approach to survey design, data collection, and interpretation has been developed which emphasizes speed and budget with minimal impact on the integrity of the interpretation or quality of the data. The following simple rules of thumb can be applied: (1) Assemble as much pre-survey information as possible, (2) Clearly define survey objectives prior to designing the survey and determine which combination of geophysical methods will best meet the objectives, (3) Continuously communicate with the client, before, during and after the investigation, (4) Only experienced GPR interpreters should acquire the field data, (5) Use real-time monitoring of the data to determine where and how much data to collect and assist in the interpretation, (6) Always ``error`` in favor of collecting too much data, (7) Surveys should have closely spaced (preferably 5 feet, no more than 10 feet), orthogonal profiles, (8) When possible, pull the antenna by hand.

  11. Short-term scheduling of an open-pit mine with multiple objectives

    Science.gov (United States)

    Blom, Michelle; Pearce, Adrian R.; Stuckey, Peter J.

    2017-05-01

    This article presents a novel algorithm for the generation of multiple short-term production schedules for an open-pit mine, in which several objectives, of varying priority, characterize the quality of each solution. A short-term schedule selects regions of a mine site, known as 'blocks', to be extracted in each week of a planning horizon (typically spanning 13 weeks). Existing tools for constructing these schedules use greedy heuristics, with little optimization. To construct a single schedule in which infrastructure is sufficiently utilized, with production grades consistently close to a desired target, a planner must often run these heuristics many times, adjusting parameters after each iteration. A planner's intuition and experience can evaluate the relative quality and mineability of different schedules in a way that is difficult to automate. Of interest to a short-term planner is the generation of multiple schedules, extracting available ore and waste in varying sequences, which can then be manually compared. This article presents a tool in which multiple, diverse, short-term schedules are constructed, meeting a range of common objectives without the need for iterative parameter adjustment.

  12. Scientific substantiation of approaches to organization and conducting radiation surveys at the rehabilitated radiation sites

    Directory of Open Access Journals (Sweden)

    I. K. Romanovich

    2017-01-01

    Full Text Available The article is concerned with the scientific justification of approaches to the organization of the final radiation survey of facilities having radioactive contamination, after their rehabilitation. Scientific publications on the previous experience in rehabilitation of facilities contaminated with radionuclides, the organization and conducting a radiation survey before the start of the decontamination, during its implementation and after its completion were analyzed. The experience in the rehabilitation of the site for the temporary storage of spent fuel and radioactive waste in Andreeva Bay in the North-West region of Russia, the locations of peaceful nuclear explosions, experimental nuclear power plants, a radiochemical laboratory, and metallurgical plants, that do not belong to radiation facilities, has been studied. It has been established that, besides the surface contamination of the soil, areas of radioactive contamination on sites of decommissioned radiation facilities with significant depth up to 15 m along the profile are available. These local zones with depth soil contamination are persistent contaminants of the groundwater. The experience in the radiation survey of the peaceful nuclear explosions sites shows the removal of radionuclides from cavities, formed with the use of nuclear explosive technologies for peaceful purposes, on the earth’s surface. An optimized list of radionuclides to be monitored during the radiological survey of rehabilitated facilities was proposed based on the analysis of the composition of radionuclides detected at radiation sites subjected to decontamination. The optimized list includes 14 radionuclides with the half-lives of more than three years. 

  13. Predicting Scheduling and Attending for an Oral Cancer Examination

    Science.gov (United States)

    Shepperd, James A.; Emanuel, Amber S.; Howell, Jennifer L.; Logan, Henrietta L.

    2015-01-01

    Background Oral and pharyngeal cancer is highly treatable if diagnosed early, yet late diagnosis is commonplace apparently because of delays in undergoing an oral cancer examination. Purpose We explored predictors of scheduling and attending an oral cancer examination among a sample of Black and White men who were at high risk for oral cancer because they smoked. Methods During an in-person interview, participants (N = 315) from rural Florida learned about oral and pharyngeal cancer, completed survey measures, and were offered a free examination in the next week. Later, participants received a follow-up phone call to explore why they did or did not attend their examination. Results Consistent with the notion that scheduling and attending an oral cancer exam represent distinct decisions, we found that the two outcomes had different predictors. Defensive avoidance and exam efficacy predicted scheduling an examination; exam efficacy and having coping resources, time, and transportation predicted attending the examination. Open-ended responses revealed that the dominant reasons participants offered for missing a scheduled examination was conflicting obligations, forgetting, and confusion or misunderstanding about the examination. Conclusions The results suggest interventions to increase scheduling and attending an oral cancer examination. PMID:26152644

  14. Advance Resource Provisioning in Bulk Data Scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Balman, Mehmet

    2012-10-01

    Today?s scientific and business applications generate mas- sive data sets that need to be transferred to remote sites for sharing, processing, and long term storage. Because of increasing data volumes and enhancement in current net- work technology that provide on-demand high-speed data access between collaborating institutions, data handling and scheduling problems have reached a new scale. In this paper, we present a new data scheduling model with ad- vance resource provisioning, in which data movement operations are defined with earliest start and latest comple- tion times. We analyze time-dependent resource assign- ment problem, and propose a new methodology to improve the current systems by allowing researchers and higher-level meta-schedulers to use data-placement as-a-service, so they can plan ahead and submit transfer requests in advance. In general, scheduling with time and resource conflicts is NP-hard. We introduce an efficient algorithm to organize multiple requests on the fly, while satisfying users? time and resource constraints. We successfully tested our algorithm in a simple benchmark simulator that we have developed, and demonstrated its performance with initial test results.

  15. Benchmarking surgeon satisfaction at academic health centers: a nationwide comparative survey.

    Science.gov (United States)

    Drachman, D A

    1996-01-01

    Forty-six academic health centers (AHCs) belonging to the University HealthSystem consortium joined forces to compare the efficiency of their surgical services and to identify best practices. In addition to measures of operational performance, surgeon satisfaction with the surgical services provided was measured by using a standardized questionnaire. From hospital records, indicators of the efficiency of surgical services were collected in three main areas: scheduling, preoperative testing and assessment, and the intraoperative process. Responding to a mail questionnaire, a sample of surgeons rated their satisfaction with key aspects of surgical services including scheduling, operating room staff, and equipment/supplies. On the basis of a review of the operational measures and the survey results, high performers were identified. Site visits were made to several of these high performers to uncover the critical factors responsible for their success. The survey revealed distinct variations in surgeon satisfaction across the participating institutions. Numerical benchmarks were obtained for surgeon satisfaction with each key component of surgical services. Scheduling was the most important component of overall surgeon satisfaction, explaining 71% of the variance in the rating of overall satisfaction with surgical services. High operational efficiency and high surgeon satisfaction were not incompatible. Several of the participating institutions were able to achieve both. These results were disseminated to all of the participants at a national meeting as well as in written form. The surgeon satisfaction survey allowed the participants to establish benchmarks for surgeon satisfaction for each key component of the surgical services they receive. The site visits revealed several common characteristics of highly efficient surgical services. Taken by themselves, the participating institutions might have been reluctant to consider adopting these best practices for fear of

  16. Site Characterization Plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 3, Part A: Chapters 6 and 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 218 figs., 50 tabs.

  17. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 3, Part A: Chapters 6 and 7

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 218 figs., 50 tabs

  18. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 1, Part A: Chapters 1 and 2

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 750 refs., 123 figs., 42 tabs

  19. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 1, Part A: Chapters 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 750 refs., 123 figs., 42 tabs.

  20. Results of the radiological survey at the former ore storage site, Palmerton, Pennsylvania (PP001)

    International Nuclear Information System (INIS)

    Cottrell, W.D.; Quillen, J.L.; Crutcher, J.W.

    1990-12-01

    As part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), the US Department of Energy (DOE) is implementing a radiological survey program to determine the radiological conditions at sites that were used by the department's predecessor agencies. The radiological survey discussed in this report for the former ore storage site in Palmerton, Pennsylvania, is part of the FUSRAP effort and was conducted at the request of DOE by members of the Measurement Applications and Development group of Oak Ridge National Laboratory (ORNL) in 1988. In 1953 and 1954 the Atomic Energy Commission (AEC) established an ore stockpile on the property of the New Jersey Zinc Corporation in Palmerton, Pennsylvania. Approximately 57 truckloads of ore (about 360 tons) were stored at this site and remained there until 1973, when the AEC initiated a clean-up program. The 1988 ORNL radiological survey included a gamma scan at the ground surface, gamma measurements at discrete locations at the surface and at 1 m above the surface, gamma logging of 80 auger holes, and collection of 161 surface and subsurface soil samples. Of these 161 soil samples, 98% were below DOE guidelines for 226 Ra concentration in soil. Interpretation of the data suggests small, isolated spots of residual ore. The data indicate that it is highly unlikely that an individual living or working on this site could receive a radiation dose approaching the 100 mrem annual limit. However, it is suggested that DOE evaluate potential exposures at this site to ensure compliance with their policy that all exposures to radiation are reduced to levels that are as low as reasonably achievable. 4 refs., 88 figs., 4 tabs

  1. Survey, Settlement, and Population History at the Ancient Maya Site of Pacbitun, Belize

    DEFF Research Database (Denmark)

    Healy, Paul F.; Helmke, Christophe G.B.; Awe, Jaime J.

    2007-01-01

    Survey and excavations of mounds on the outskirts of the site of Pacbitun in western Belize provide insights to the ancient Maya settlement pattern at this medium-sized regional center. This research employed two methods: analysis of structural remains from four separate 1000 m transect surveys...... to have been about 5000-6000 persons. This population estimate is compared with several coeval lowland Maya centers, and found to be reasonable for a medium-sized, Late Classic Maya center....

  2. 25 CFR 142.7 - How are transportation and scheduling determined?

    Science.gov (United States)

    2010-04-01

    ... advantage of economies of scale and consider geographic disparity and distribution of sites. (b) Itineraries... shipping season the final departure and arrival schedules must be distributed prior to the commencement of...

  3. Identification of flora and fauna biodiversity at Berau, East Kalimantan in NPP pre site survey

    International Nuclear Information System (INIS)

    June Mellawati; Fepriadi; Yarianto; Tajudin Laddade

    2010-01-01

    In pre survey activity of NPP site candidate, environmental aspect is a part of non safety aspect, but the existence as an important area is needed to consider. Pre survey activity of NPP site at Berau East Kalimantan is done for follow up result of agreement of Governor in Kalimantan. Purpose of study is to identify fauna and flora biodiversity in Berau Kalalimantn Timur to complete the data base of environmental aspect at survey activity of NPP site candidate The method used is to conduct an inventory and identification of flora-fauna through secondary data collection, making zoning area based on the type of endangered species, and analyze and evaluate the suitability. The survey location priority the coast area such as Sambaliung District, Derawan, Maratua, Tabalar, Biatan-Lempake, Talisayan, Batu Putih and Biduk-Biduk District, Berau Regency, East Kalimantan Province. Activity is done at June 2008 - June 2009. The results showed that there were various species of flora and fauna that are categorized protected under Law Decree no. 5 of 1990 in the study location. However, some areas such as Tanjung Pandan, Tanjung Bohe northern, southern of Tanjung Ulingan, District Derawan Island, and Batu Putih Talisayan District, and Teluk Sulaiman, Biduk-Biduk District need further study and consideration for zoning interest in nuclear power plants because they meet the existing criteria. (author)

  4. SYSTEMATIC LITERATURE REVIEW ON RESOURCE ALLOCATION AND RESOURCE SCHEDULING IN CLOUD COMPUTING

    OpenAIRE

    B. Muni Lavanya; C. Shoba Bindu

    2016-01-01

    The objective the work is intended to highlight the key features and afford finest future directions in the research community of Resource Allocation, Resource Scheduling and Resource management from 2009 to 2016. Exemplifying how research on Resource Allocation, Resource Scheduling and Resource management has progressively increased in the past decade by inspecting articles, papers from scientific and standard publications. Survey materialized in three-fold process. Firstly, investigate on t...

  5. Tornado damage at the Grand Gulf, Mississippi nuclear power plant site: aerial and ground surveys

    International Nuclear Information System (INIS)

    Fujita, T.T.; McDonald, J.R.

    1978-05-01

    A tornado struck the Grand Gulf nuclear power generating station, Port Gibson, Mississippi, about 11:30 p.m. on April 17, 1978. Storm damage investigators from the University of Chicago and Texas Tech University were dispatched to survey the damage. The meteorological situation that spawned the Grand Gulf tornado and seven others in the area is discussed. Aerial surveys of the entire damage path and detailed surveys of the plant site are presented. An engineering evaluation of the damage is also presented based primarily on information gained from detailed ground surveys

  6. Site surveying and levelling

    CERN Document Server

    Clancy, John

    2013-01-01

    This popular and useful text has been completely revised and up-dated so that it forms and indipensible handbook for any student of surveying. An additional chapter on modern developments is included and the text has also been extended to cover ordnance survey; calculation of areas; computation of true horizontal length; measurement of vertical angles; Code of Measuring Practice; curve ranging and calculations of volumes for earthworks.

  7. Environmental audit of the Maywood Site: Formerly Utilized Sites Remedial Action Program, Maywood Interim Storage Site vicinity properties

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    This report presents the results of the Environmental Audit of the Maywood Site managed by the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Audit was carried out from November 7 through 16, 1990. The Audit Team found overall technical competence and knowledge of management and staff to be excellent. This applies to DOE as well as to Bechtel National, Incorporated (BNI). In particular, there was excellent knowledge of federal, state, and local environmental regulations, as well as analysis for applicability of these regulations to FUSRAP. Project management of the Maywood Site is also excellent. BNI and DOE project staff have made frequent contact with members of the community, and all removal actions and remedial investigation activities have been planned, scheduled, and accomplished with competence and attention to total quality principles. To date, all actions taken for the Maywood Site cleanup have been completed ahead of schedule and on or under budget. Weakness noted include self-assessment efforts by DOE, failure to fully implement DOE Order requirements throughout the program, and some discrepancies in formally documenting and reviewing procedures. 7 figs., 10 tabs.

  8. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 2, Part A: Chapters 3, 4, and 5

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1--5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 575 refs., 84 figs., 68 tabs

  9. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 2, Part A: Chapters 3, 4, and 5

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1--5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 575 refs., 84 figs., 68 tabs.

  10. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  11. Consumer assessment of healthcare providers and systems surgical care survey: benefits and challenges.

    Science.gov (United States)

    Schulz, Kristine A; Rhee, John S; Brereton, Jean M; Zema, Carla L; Witsell, David L

    2012-10-01

    To describe the feasibility and initial results of the implementation of a continuous quality improvement project using the newly available Consumer Assessment of Healthcare Providers and Systems Surgical Care Survey (S-CAHPS), in a small cohort of otolaryngology-head and neck surgery practices. Prospective observational study using a newly validated health care consumer survey. Two community-based and 2 university-based otolaryngology-head and neck surgery outpatient clinic practices. Fourteen board-certified otolaryngology, head and neck surgeons from 4 practice sites voluntarily participated in this project. All adult patients scheduled for surgery during a 12-month period were asked to complete the S-CAHPS survey through an electronic data capture (EDC) system 7 to 28 days after surgery. The surgeons were not directly involved in administration or collection of survey data. Three sites successfully implemented the S-CAHPS project. A 39.9% response rate was achieved for the cohort of surgical patients entered into the EDC system. While most patients rated their surgeons very high (mean of 9.5 or greater out of 10), subanalysis revealed there is variability among sites and surgeons in communication practices. From these data, a potential surgeon Quality Improvement report was developed that highlights priority areas to improve surgeon-patient rapport. The S-CAHPS survey can be successfully implemented in most otolaryngology practices, and our initial work holds promise for how the survey can be best deployed and analyzed for the betterment of both the surgeon and the patient.

  12. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  13. Master schedule for CY-1984 Hanford environmental surveillance routine sampling program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1983-12-01

    This report provides the current schedule of data collection for the routine Hanford environmental surveillance and ground-water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. The routine sampling schedule provided herein does not include samples that are planned to be collected during FY-1984 in support of special studies, special contractor support programs, or for quality control purposes

  14. Nevada Test Site Area 25. Radiological survey and cleanup project, 1974-1983. Final report

    International Nuclear Information System (INIS)

    McKnight, R.K.; Rosenberry, C.E.; Orcutt, J.A.

    1984-01-01

    This report describes radiological survey, decontamination and decommissioning of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The cleanup was part of the Surplus Facilities Management Program funded by the Department of Energy's Richland Operations Office. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for alpha and beta plus gamma radiation contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 12 figures

  15. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  16. Fiscal year 1991 report on archaeological surveys of the 100 Areas, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Chatters, J.C.; Gard, H.A.; Minthorn, P.E.

    1992-09-01

    In compliance with Section 106 of the National Historic Preservation Act (NHPA), and at the request of Westinghouse Hanford Company, the Hanford Cultured Resources Laboratory (HCRL) conducted an archaeological survey during FY 1991 of the 100-Area reactor compounds on the US Department of Energy's Hanford Site. This survey was conducted as part of a comprehensive resources review of 100-Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) operable units in support of CERCLA characterization activities. The work included a lite and records review and pedestrian survey of the project area following procedures set forth in the Hanford Cultural Resources Management Plan

  17. Quarterly Environmental Radiological Survey Summary Third Quarter 1998, 100, 200, 300, and 600 Areas; TOPICAL

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    1998-01-01

    This report provides a summary of the radiological surveys performed in support of near-facility environmental monitoring at the Hanford Site. The Third Quarter 1998 survey results and the status of actions required are summarized: (1) All of the eighty-five environmental radiological surveys scheduled during July, August and September were performed as planned. Fifty-one of the surveys were conducted at Project Hanford Management Contractors (PHMC) sites and thirty-four at Environmental Restoration Contractor (ERC) sites. Contamination above background levels was found at seventeen of the PHMC waste sites and two of the ERC waste sites. Contamination levels as high and gt;1,000,000 disintegrations per minute (dpm) per 100 cm(sup 2) were reported. Of these contaminated surveys nine were in Underground Radioactive Material (URM) areas, three were in unposted areas and seven were in contamination areas. The contamination found within four of the URM and three of the CA areas was immediately cleaned up and no further action was required. The remaining five URM and two unposted sites were posted and along with the five CA sites will require remediation. Radiological Problem Reports (RPR's) were issued and the sites were turned over to the landlord for further action as required. (2) During the second quarter of 1998, 1.2 hectares (3.0 acres) were stabilized and radiologically down posted from Contamination Area (CA)/Soil Contamination (SC) to URM. (3) Four hectares (10 acres) located south and west of B-Plant were posted as a radiological buffer area as a result of a contamination spread. This off-normal occurrence is currently being investigated. (4) Four Surveillance Compliance Inspection Reports (SCIRs) remained open and had not been resolved. Tank Farms Operations has responsibility for the unresolved SCIRs

  18. An integrated system for conducting radiological surveys of contaminated sites - 16312

    International Nuclear Information System (INIS)

    McCown, Jay P.; Rogers, Donna M.; Waggoner, Charles A.

    2009-01-01

    This paper describes an integrated detection system that has been developed to conduct radiological surveys of sites suspected of contamination of materials such as depleted uranium. This system utilizes cerium activated lanthanum bromide and thallium activated sodium iodide gamma detectors and can be easily adapted to include units for detecting neutrons. The detection system includes software controlling the collection of radiological spectra and GPS data. Two different platforms are described for conducting surveys, a modified zero turn radius (ZTR) mower and a three-wheeled cart that is manually pushed. The detection system software controlling data collection has components that facilitate completing a grid-less survey on user specified spacings. Another package confirms that all data quality activities (calibrations, etc.) are conducted prior to beginning the survey and also reviews data to identify areas that have been missed for which data quality falls below user designated parameters. Advanced digital signal processing algorithms are used to enhance the interpretation of spectra for conducting background subtractions and for mapping. Data from radiation detection instruments and GPS antennae are merged and made compatible with mapping using Geosoft Oasis montaj software. A summary of system performance during field-testing is included in the paper. This includes survey rate, detection limits, duty cycle, supporting ancillary equipment/material, and manpower requirements. The rate of false positives and false negatives is discussed with the benefits of surveys conducted using synergetic detection systems such as electromagnetic induction imaging. (authors)

  19. Geotechnical investigations of the PEP site

    International Nuclear Information System (INIS)

    Gould, R.S.

    1976-02-01

    The purpose of this paper is to summarize the general nature of the geology and rock and soil formations of the PEP site as they relate to the design and construction of the project; to describe site investigation programs and to catalog the geotechnical information presently available about the site. The recently-completed investigation of subterranean conditions around the PEP ring when coupled with previous surveys gives us a good understanding of what to expect with regard to tunneling, undertaking larger underground excavations and constructing research halls are the interaction areas. It bears out the predictions made in Jacobs and Associates' report of 1973; i.e., that the ring housing construction is classified as soft-ground tunneling and that large underground openings, such as region 10 and the injection junction structures, will require great attention to support. A shield or shields will probably be required. On the positive side, the site affords very good conditions for soft-ground tunneling. Water will be a problem in some areas, but not an unsolvable one. The possibility of encountering lethal or explosive gases, almost always the case in tunneling in California's coastal formations, exists but has not been ascertained. Finally, no reasons to change current cost estimates or schedules have merged from the investigation. 13 refs., 1 fig

  20. Formerly utilized MED/AEC sites, Remedial Action Program: radiological survey of the Hooker Chemical Company, Niagara Falls, New York. Final report

    International Nuclear Information System (INIS)

    1977-01-01

    Results of a radiological survey of a portion of the Hooker Chemical Company, Niagara Falls, New York, are presented. The survey was conducted over 5.5-acres in which uranium-bearing materials were handled in the early 1940's. The survey included direct measurements of alpha, beta-gamma, and external gamma radiation throughout the site, measurement of transferable alpha and beta contamination levels in the buildings, determination of uranium and radium concentrations in the soild on the site, measurement of radon and radon daughter concentrations in the buildings, and determination of radionuclide concentrations in surface water samples. The results of the survey indicate that radiation levels throughout the site are within pertinent guidelines for unrestricted release of the property

  1. Health survey on cancers about the Tricastin nuclear site; Etude sanitaire sur les cancers autour du site nucleaire du Tricastin

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    This survey aims at describing the health status of the population around the Tricastin site, and more particularly at determining whether there is a difference between death or cancer occurrence frequencies observed around this site with respect to reference frequencies. It does not aim at assessing the health impact of the site industrial installations. Cancer mortality data, cancer diagnosis data, demographic data, child cancer data, data related to hospital stays in relationship with cancer, long duration hospital stay data, and mortality data are used. Several indicators are defined and used: standardised mortality ratio, standardised hospitalisation ratio. Data are also analysed in terms of location, and socio-demographic categories. It appears that there is no specific health situation for the considered area, except for pancreas cancer for women

  2. Finding and evaluating potential radiological problems in the vicinity of uranium milling sites

    International Nuclear Information System (INIS)

    Goldsmith, W.A.; Yates, W.G.

    1982-01-01

    Tailings at inactive milling sites usually have a low frequency of human occupancy but continuously generate 222 Rn into the atmosphere. Measurements of airborne 222 Rn and 222 Rn flux are made on the sites to define the tailings source term. Concurrently with these measurements, an ambient 222 Rn monitoring network is established off-site and a meteolrololgical station is established at or near the mill site. Radioactivity can migrate to areas outside of site boundaries by wind and water erosion, groundwater transport, spillage of incoming purposes. In order to identify and assess off-site radioactivity on properties in the vicinity of milling sites, a combination of aerial and ground-level radiological monitoring techniques are used. The ground mobile gamma-ray scan is conducted using a vehicle equipped with sensitive gamma-ray detectors. The detectors are shielded so that gamma radiation input is viewed through only one side of the vehicle. This system is capable of precisely locating properties which have anomalously high gamma radiation levels caused by the presence of tailings. Subsequently, these properties are identified as candidate vicinity properties and are scheduled for radiological surveys subject to the property owner's consent. The comprehensive radiological surveys conducted at these vicinity properties determine the amount, type, and location of tailings materials. Structures on a vicinity property are carefully surveyed to determine the presence or absence of construction-related uses of tailings. If structural uses of tailings are found, air samples are analyzed for 222 Rn progeny, short-term continuous 222 Rn monitoring is instituted, and 222 Rn flux rate from tailings are estimated. If warranted, long-term 222 Rn and progeny measurements are made

  3. Coral Reef Surveys at 21 Sites in American Samoa during 2002 (NODC Accession 0000735)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Transects of the coral colonies at 21 sites in American Samoa were surveyed by Dr. Charles Birkeland during an underwater swim in March 2002. Data for each coral...

  4. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  5. An aerial radiological survey of the southwest drainage basin area of the Savannah River Site

    International Nuclear Information System (INIS)

    Feimster, E.L.

    1994-04-01

    An aerial radiological survey was conducted over a 106-square-mile area of the Savannah River Site (SRS), formerly the Savannah River Plant. The survey was conducted from August 24 through September 8, 1988, to collect baseline radiological data over the area. Both natural and man-made gamma emitting radionuclides were detected in the area. The detected man-made sources were confined to creeks, branches, and SRS facilities in the surveyed area and were a result of SRS operations. Naturally-occurring radiation levels were consistent with those levels detected in adjacent areas during previous surveys. The annual dose levels were within the range of levels found throughout the United States

  6. Human-Robot Site Survey and Sampling for Space Exploration

    Science.gov (United States)

    Fong, Terrence; Bualat, Maria; Edwards, Laurence; Flueckiger, Lorenzo; Kunz, Clayton; Lee, Susan Y.; Park, Eric; To, Vinh; Utz, Hans; Ackner, Nir

    2006-01-01

    NASA is planning to send humans and robots back to the Moon before 2020. In order for extended missions to be productive, high quality maps of lunar terrain and resources are required. Although orbital images can provide much information, many features (local topography, resources, etc) will have to be characterized directly on the surface. To address this need, we are developing a system to perform site survey and sampling. The system includes multiple robots and humans operating in a variety of team configurations, coordinated via peer-to-peer human-robot interaction. In this paper, we present our system design and describe planned field tests.

  7. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  8. An aerial radiological survey of L Lake and Steel Creek, Savannah River Site, Aiken, South Carolina

    International Nuclear Information System (INIS)

    Feimster, E.L.

    1992-11-01

    An aerial radiological survey was conducted over a portion of the Savannah River Site along the Steel Creek Corridor during the period of July 16--31, 1986. Similar surveys of this area were performed in 1974, 1979, 1982, 1983, and 1985. This survey was flown with the same survey parameters and coverage as the 1985 survey to obtain measurements of both natural and man-made gamma radiation. These radiological measurements were used to determine if there had been any changes in concentration, spatial distribution, or estimated equivalent annual dose (mrem/yr) of the natural terrestrial background or man-made contaminants detected during the 1985 survey and earlier. The 1986 data are presented as isodose rate contour maps with overlays of corresponding 1985 survey data

  9. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  10. Fiscal year 1991 report on archaeological surveys of the 100 Areas, Hanford Site, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Chatters, J.C.; Gard, H.A.; Minthorn, P.E.

    1992-09-01

    In compliance with Section 106 of the National Historic Preservation Act (NHPA), and at the request of Westinghouse Hanford Company, the Hanford Cultured Resources Laboratory (HCRL) conducted an archaeological survey during FY 1991 of the 100-Area reactor compounds on the US Department of Energy`s Hanford Site. This survey was conducted as part of a comprehensive resources review of 100-Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) operable units in support of CERCLA characterization activities. The work included a lite and records review and pedestrian survey of the project area following procedures set forth in the Hanford Cultural Resources Management Plan.

  11. Fiscal year 1991 report on archaeological surveys of the 100 Areas, Hanford Site, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Chatters, J.C.; Gard, H.A.; Minthorn, P.E.

    1992-09-01

    In compliance with Section 106 of the National Historic Preservation Act (NHPA), and at the request of Westinghouse Hanford Company, the Hanford Cultured Resources Laboratory (HCRL) conducted an archaeological survey during FY 1991 of the 100-Area reactor compounds on the US Department of Energy's Hanford Site. This survey was conducted as part of a comprehensive resources review of 100-Area Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) operable units in support of CERCLA characterization activities. The work included a lite and records review and pedestrian survey of the project area following procedures set forth in the Hanford Cultural Resources Management Plan.

  12. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  13. Slingram survey at Yucca Mountain on the Nevada Test Site

    International Nuclear Information System (INIS)

    Flanigan, V.J.

    1981-01-01

    Electromagnetic (EM) data presented in this report is part of study by the US Geological Survey aimed at evaluating the Miocene and Pliocene Yucca Mountain Member of various units of the Paintbrush Tuff in the vicinity of Yucca Mountain as a possible repository for nuclear wastes. The survey area is located about 97 km northwest of Las Vegas, Nevada on the Nevada Test Site. Data contained in this report were taken along the eastern edge of Yucca Mountain. The specific purpose of this survey was to determine with EM methods, whether or not northwest-trending valleys in the Yucca Mountain area were fault controlled. Fault and fracture zones in the tuff units were expected to have a somewhat higher conductivity than the unfractured tuff. This is due to the greater porosity, clay and moisture content expected in the fault zones than in unfaulted rock. Depending upon a number of factors, such as the conductivity contrast between fault zones and unfaulted rock, and the depth and conductivity of the overburden, it may be possible to recognize fault zones from surface EM measurements. Several EM methods were tested to determine which one gave the best results in this environment. The methods tried included slingram, Turam and VLF (very low frequency). Slingram data proved to be most diagnostic in delineating a mapped fault on the east edge of Yucca Mountain, and hence was used in the survey traverses crossing the northwest valleys cutting into Yucca Mountain

  14. Artificial intelligence for the CTA Observatory scheduler

    Science.gov (United States)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint

  15. Cancer mortality and incidence survey around the Aube's low- and medium-activity radioactive waste storage site

    International Nuclear Information System (INIS)

    2010-01-01

    This report presents the main results of a survey performed in 2010 to describe the health status of the population around the Aube's low- and medium-activity radioactive waste storage site. The aim of this survey was to determine whether the frequencies of death and hospitalization on account of cancer are different for this population (15 km around the site) with respect to two reference populations (the population of the Champagne-Ardennes region and the French metropolitan population). Results of mortality, hospitalization, and lung cancer are presented under the form of maps and tables giving global data or data for males, females, adults, or children

  16. Requirements of on-site facilities

    International Nuclear Information System (INIS)

    Burchardt, H.

    1977-01-01

    1) Requirements of on-site facilities: a) brief description of supplying the site with electricity and water; communication facilities, b) necessary facilities for containment and pipeline installation, c) necessary facilities for storage, safety, accommodation of personnel, housing; workshops; 2) Site management: a) Organisation schedules for 'turn-key-jobs' and 'single commission', b) Duties of the supervisory staff. (orig.) [de

  17. Master schedule for CY-1978. Hanford Environmental Surveillance Routine Program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Myers, D.A.; Fix, J.J.

    1977-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. No results are presented in this report. The data collected are available in routine reports issued by the Environmental Evaluations staff

  18. Radiological survey results for the Peek Street site properties, Schenectady, New York

    International Nuclear Information System (INIS)

    Foley, R.D.; Cottrell, W.D.; Carrier, R.F.

    1992-08-01

    The Peek Street Industrial Facility, located at 425 Peek Street, Schenectady, New York, was operated by the General Electric Company for the Atomic Energy Commission (AEC) between 1947 and 1955. A variety of operations using radioactive materials were conducted at the site, but the main activities were to design an intermediate breeder reactor and to develop a chemical process for the recovery of uranium and plutonium from spent reactor fuel. Nonradioactive beryllium metal was machined on the site for breeder reactor application. The 4.5-acre site was decommissioned and released in October 1955. A radiological survey was conducted by Oak Ridge National Laboratory in November 1989. The survey included scan and grid point measurements of direct radiation levels outdoors on the five properties and inside the factory building, and radionuclide analysis of samples collected from each property. Radionuclide concentrations were determined in outdoor surface and subsurface soil samples from each property and in dust, debris, and structural materials from inside the factory building. Auger holes were logged to assess location and extent of possible subsurface residual soil radioactivity. Radionuclide concentrations were deter-mined in both indoor and outdoor water samples and in selected samples of vegetation. The presence of fixed and transferable surface residual radioactivity was investigated inside the factory building and on discarded materials outdoors on the property. High-volume air samples as well as additional selected indoor and outdoor soil samples were analyzed to determine levels of elemental beryllium

  19. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  20. Survey Email Scheduling and Monitoring in eRCTs (SESAMe): A Digital Tool to Improve Data Collection in Randomized Controlled Clinical Trials.

    Science.gov (United States)

    Skonnord, Trygve; Steen, Finn; Skjeie, Holgeir; Fetveit, Arne; Brekke, Mette; Klovning, Atle

    2016-11-22

    Electronic questionnaires can ease data collection in randomized controlled trials (RCTs) in clinical practice. We found no existing software that could automate the sending of emails to participants enrolled into an RCT at different study participant inclusion time points. Our aim was to develop suitable software to facilitate data collection in an ongoing multicenter RCT of low back pain (the Acuback study). For the Acuback study, we determined that we would need to send a total of 5130 emails to 270 patients recruited at different centers and at 19 different time points. The first version of the software was tested in a pilot study in November 2013 but was unable to deliver multiuser or Web-based access. We resolved these shortcomings in the next version, which we tested on the Web in February 2014. Our new version was able to schedule and send the required emails in the full-scale Acuback trial that started in March 2014. The system architecture evolved through an iterative, inductive process between the project study leader and the software programmer. The program was tested and updated when errors occurred. To evaluate the development of the software, we used a logbook, a research assistant dialogue, and Acuback trial participant queries. We have developed a Web-based app, Survey Email Scheduling and Monitoring in eRCTs (SESAMe), that monitors responses in electronic surveys and sends reminders by emails or text messages (short message service, SMS) to participants. The overall response rate for the 19 surveys in the Acuback study increased from 76.4% (655/857) before we introduced reminders to 93.11% (1149/1234) after the new function (P<.001). Further development will aim at securing encryption and data storage. The SESAMe software facilitates consecutive patient data collection in RCTs and can be used to increase response rates and quality of research, both in general practice and in other clinical trial settings. ©Trygve Skonnord, Finn Steen, Holgeir

  1. An aerial radiological survey of the Double Track Site and surrounding area, Central Nevada. Date of survey: December 1993

    International Nuclear Information System (INIS)

    1995-08-01

    An aerial radiological survey of the Double Track Site was conducted in December 1993. An interim report described survey procedures and presented terrestrial exposure rate and wide-area-averaged plutonium isopleth plots. This letter report presents additional plutonium plots and some rule-of-thumb calculations which should help the reader to properly interpret the data presented. Attached to this report are three isopleth plots produced from the Double Track data. No one processing method provides all the answers regarding a particular surveyed area. Where peak vales are most important, a figure created from the original unsmoothed data is the presentation of choice. A figure from smoothed data is superior for the detection of areas of widespread low-level contamination. A figure , also smoothed data, satisfied a particular early mission goal but is not as useful for cleanup operations as the other two. This last figure is presented for historical completeness only

  2. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  3. Timing of spring surveys for midcontinent sandhill cranes

    Science.gov (United States)

    Pearse, Aaron T.; Krapu, Gary L.; Brandt, David A.; Sargeant, Glen A.

    2015-01-01

    The U.S. Fish and Wildlife Service has used spring aerial surveys to estimate numbers of migrating sandhill cranes (Grus canadensis) staging in the Platte River Valley of Nebraska, USA. Resulting estimates index the abundance of the midcontinent sandhill crane population and inform harvest management decisions. However, annual changes in the index have exceeded biologically plausible changes in population size (>50% of surveys between 1982 and 2013 indicate >±20% change), raising questions about nuisance variation due to factors such as migration chronology. We used locations of cranes marked with very-high-frequency transmitters to estimate migration chronology (i.e., proportions of cranes present within the Platte River Valley). We also used roadside surveys to determine the percentage of cranes staging at the Platte River Valley but outside of the survey area when surveys occur. During March 2001–2007, an average of 86% (71–94%; SD = 7%) of marked cranes were present along the Platte River during scheduled survey dates, and 0–11% of cranes that were present along the Platte River were not within the survey boundaries. Timing of the annual survey generally corresponded with presence of the greatest proportion of marked cranes and with least inter-annual variation; consequently, accuracy of estimates could not have been improved by surveying on different dates. Conducting the survey earlier would miss birds not yet arriving at the staging site; whereas, a later date would occur at a time when a larger portion of birds may have already departed the staging site and when a greater proportion of birds occurred outside of the surveyed area. Index values used to monitor midcontinent sandhill crane abundance vary annually, in part, due to annual variation in migration chronology and to spatial distribution of cranes in the Platte River Valley; therefore, managers should interpret survey results cautiously, with awareness of a continuing need to identify and

  4. Geophysical survey of two rural sites in Mallorca (Balearic Islands, Spain): Unveiling Roman villae

    Science.gov (United States)

    Mas Florit, Catalina; Cau Ontiveros, Miguel Ángel; Goossens, Lise; Meyer, Cornelius; Sala, Roger; Ortiz, Helena

    2018-03-01

    Two rural sites on the island of Mallorca (Balearic Islands, Spain) have been investigated with geophysical methods. A previous archaeological field survey provided surface ceramics that allowed for a first classification of the sites as possible Roman rural settlements, possibly villae. The objective of the investigation was to work towards the identification of architectural remains to better understand the true nature of the sites. Using the 7-probe fluxgate gradiometer array LEA MAX, magnetic measurements were executed on a large area on each site. GPR measurements were subsequently carried out to examine selected areas of interest in detail by means of the IDS GPR system based on the Fast-Wave module. The investigated areas demonstrated excellent surface conditions with a negligible number of sources of disturbance, permitting a detailed interpretation of the geophysical data. The results helped to reveal the presence of architectural remains beneath the soil at both sites.

  5. A cost/schedule and control system for the environmental restoration program Albuquerque Field Office

    International Nuclear Information System (INIS)

    Fiske, Wanda S.; Bischoff, Edward L.; Rea, Kenneth H.; Dwain Farley, P.; Biedermann, Charles A.

    1992-01-01

    The Department of Energy (DOE) Field Office Albuquerque (AL), Environmental Restoration Project Office (ERPO), has developed a project management system used to plan, document, and control Environmental Restoration (ER) work at eight installations and one superfund site managed by AL. This system emphasizes control of the cost, schedule, and technical elements of the Program. It supports programmatic documentation such as the Environmental Restoration/Waste Management Five-Year Plan, Site Specific Plan, and budget requests. The System provides information used to manage the ER Program at all levels of management (i.e., from low-level day-to-day activities to high-level upper management). The System requires substantial effort to ensure reliability; however, the benefit to ERPO is an effective, proactive project management tool. This paper provides an overview of the ERPO System, an explanation of how it is implemented, and lessons learned from this process. Application of the System to cost estimating, annual and five-year budget preparation, resource projections, scheduling, and cost/schedule performance measurement is discussed. Also discussed are cost/schedule review procedures, along with variance identification and resolution. Examples are taken from the Pinellas ER Program. (author)

  6. Schedule Control and Nursing Home Quality: Exploratory Evidence of a Psychosocial Predictor of Resident Care.

    Science.gov (United States)

    Hurtado, David A; Berkman, Lisa F; Buxton, Orfeu M; Okechukwu, Cassandra A

    2016-02-01

    To examine whether nursing homes' quality of care was predicted by schedule control (workers' ability to decide work hours), independently of other staffing characteristics. Prospective ecological study of 30 nursing homes in New England. Schedule control was self-reported via survey in 2011-2012 (N = 1,045). Quality measures included the prevalence of decline in activities of daily living, residents' weight loss, and pressure ulcers, indicators systematically linked with staffing characteristics. Outcomes data for 2012 were retrieved from Medicare.gov. Robust Linear Regressions showed that higher schedule control predicted lower prevalence of pressure ulcers (β = -0.51, p job satisfaction, and turnover intentions. Higher schedule control might enhance the planning and delivery of strategies to prevent or cure pressure ulcers. Further research is needed to identify potential causal mechanisms by which schedule control could improve quality of care. © The Author(s) 2014.

  7. Non-standard work schedules, gender, and parental stress

    Directory of Open Access Journals (Sweden)

    Mariona Lozano

    2016-02-01

    Full Text Available Background: Working non-standard hours changes the temporal structure of family life, constraining the time that family members spend with one another and threatening individuals' well-being. However, the empirical research on the link between stress and non-standard schedules has provided mixed results. Some studies have indicated that working non-standard hours is harmful whereas others have suggested that working atypical hours might facilitate the balance between family and work. Moreover, there is some evidence that the association between stress and non-standard employment has different implications for men and women. Objective: This paper examines the association between non-standard work schedules and stress among dual-earner couples with children. Two research questions are addressed. First, do predictability of the schedule and time flexibility moderate the link between non-standard work hours and stress? Second, do non-standard schedules affect men's and women's perceptions of stress differently? Methods: We use a sample of 1,932 working parents from the Canadian 2010 General Social Survey, which includes a time-use diary. A sequential logit regression analysis stratified by gender is employed to model two types of result. First, we estimate the odds of being stressed versus not being stressed. Second, for all respondents feeling stressed, we estimate the odds of experiencing high levels versus moderate levels of stress. Results: Our analysis shows that the link between non-standard working hours and perceived stress differs between mothers and fathers. First, fathers with non-standard schedules appear more likely to experience stress than those working standard hours, although the results are not significant. Among mothers, having a non-standard schedule is associated with a significantly lower risk of experiencing stress. Second, the analysis focusing on the mediating role of flexibility and predictability indicates that

  8. Survey of subsurface treatment technologies for environmental restoration sites at Sandia National Laboratories, New Mexico.

    Energy Technology Data Exchange (ETDEWEB)

    McGrath, Lucas K.; Ho, Clifford Kuofei; Wright, Jerome L.

    2003-08-01

    This report provides a survey of remediation and treatment technologies for contaminants of concern at environmental restoration (ER) sites at Sandia National Laboratories, New Mexico. The sites that were evaluated include the Tijeras Arroyo Groundwater, Technical Area V, and Canyons sites. The primary contaminants of concern at these sites include trichloroethylene (TCE), tetrachloroethylene (PCE), and nitrate in groundwater. Due to the low contaminant concentrations (close to regulatory limits) and significant depths to groundwater ({approx}500 feet) at these sites, few in-situ remediation technologies are applicable. The most applicable treatment technologies include monitored natural attenuation and enhanced bioremediation/denitrification to reduce the concentrations of TCE, PCE, and nitrate in the groundwater. Stripping technologies to remove chlorinated solvents and other volatile organic compounds from the vadose zone can also be implemented, if needed.

  9. Archaeological field survey automation: concurrent multisensor site mapping and automated analysis

    Science.gov (United States)

    Józefowicz, Mateusz; Sokolov, Oleksandr; Meszyński, Sebastian; Siemińska, Dominika; Kołosowski, Przemysław

    2016-04-01

    ABM SE develops mobile robots (rovers) used for analog research of Mars exploration missions. The rovers are all-terrain exploration platforms, carrying third-party payloads: scientific instrumentation. "Wisdom" ground penetrating radar for Exomars mission has been tested onboard, as well as electrical resistivity module and other devices. Robot has operated in various environments, such as Central European countryside, Dachstein ice caves or Sahara, Morocco (controlled remotely via satellite from Toruń, Poland. Currently ABM SE works on local and global positioning system for a Mars rover basing on image and IMU data. This is performed under a project from ESA. In the next Mars rover missions a Mars GIS model will be build, including an acquired GPR profile, DEM and regular image data, integrated into a concurrent 3D terrain model. It is proposed to use similar approach in surveys of archaeological sites, especially those, where solid architecture remains can be expected at shallow depths or being partially exposed. It is possible to deploy a rover that will concurrently map a selected site with GPR, 2D and 3D cameras to create a site model. The rover image processing algorithms are capable of automatic tracing of distinctive features (such as exposed structure remains on a desert ground, differences in color of the ground, etc.) and to mark regularities on a created map. It is also possible to correlate the 3D map with an aerial photo taken under any angle to achieve interpretation synergy. Currently the algorithms are an interpretation aid and their results must be confirmed by a human. The advantages of a rover over traditional approaches, such as a manual cart or a drone include: a) long hours of continuous work or work in unfavorable environment, such as high desert, frozen water pools or large areas, b) concurrent multisensory data acquisition, c) working from the ground level enables capturing of sites obstructed from the air (trees), d) it is possible to

  10. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 4, Part B: Chapter 8, Sections 8.0 through 8.3.1.4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 74 figs., 32 tabs.

  11. Draft Site Treatment Plan (DSTP), Volumes I and II

    International Nuclear Information System (INIS)

    D'Amelio, J.

    1994-01-01

    Site Treatment Plans (STP) are required for facilities at which the DOE generates or stores mixed waste. This Draft Site Treatment Plan (DSTP) the second step in a three-phase process, identifies the currently preferred options for treating mixed waste at the Savannah River Site (SRS) or for developing treatment technologies where technologies do not exist or need modification. The DSTP reflects site-specific preferred options, developed with the state's input and based on existing available information. To the extent possible, the DSTP identifies specific treatment facilities for treating the mixed waste and proposes schedules. Where the selection of specific treatment facilities is not possible, schedules for alternative activities such as waste characterization and technology assessment are provided. All schedule and cost information presented is preliminary and is subject to change. The DSTP is comprised of two volumes: this Compliance Plan Volume and the Background Volume. This Compliance Plan Volume proposes overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) of RCRA and procedures for converting the target dates into milestones to be enforced under the Order. The more detailed discussion of the options contained in the Background Volume is provided for informational purposes only

  12. Statistics available for site studies in registers and surveys at Statistics Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Haldorson, Marie [Statistics Sweden, Oerebro (Sweden)

    2000-03-01

    Statistics Sweden (SCB) has produced this report on behalf of the Swedish Nuclear Fuel and Waste Management Company (SKB), as part of the data to be used by SKB in conducting studies of potential sites. The report goes over the statistics obtainable from SCB in the form of registers and surveys. The purpose is to identify the variables that are available, and to specify their degree of geographical detail and the time series that are available. Chapter two describes the statistical registers available at SCB, registers that share the common feature that they provide total coverage, i.e. they contain all 'objects' of a given type, such as population, economic activities (e.g. from statements of employees' earnings provided to the tax authorities), vehicles, enterprises or real estate. SCB has exclusive responsibility for seven of the nine registers included in the chapter, while two registers are ordered by public authorities with statistical responsibilities. Chapter three describes statistical surveys that are conducted by SCB, with the exception of the National Forest Inventory, which is carried out by the Swedish University of Agricultural Sciences. In terms of geographical breakdown, the degree of detail in the surveys varies, but all provide some possibility of reporting data at lower than the national level. The level involved may be county, municipality, yield district, coastal district or category of enterprises, e.g. aquaculture. Six of the nine surveys included in the chapter have been ordered by public authorities with statistical responsibilities, while SCB has exclusive responsibility for the others. Chapter four presents an overview of the statistics on land use maintained by SCB. This chapter does not follow the same pattern as chapters two and three but instead gives a more general account. The conclusion can be drawn that there are good prospects that SKB can make use of SCB's data as background information or in other ways when

  13. Statistics available for site studies in registers and surveys at Statistics Sweden

    International Nuclear Information System (INIS)

    Haldorson, Marie

    2000-03-01

    Statistics Sweden (SCB) has produced this report on behalf of the Swedish Nuclear Fuel and Waste Management Company (SKB), as part of the data to be used by SKB in conducting studies of potential sites. The report goes over the statistics obtainable from SCB in the form of registers and surveys. The purpose is to identify the variables that are available, and to specify their degree of geographical detail and the time series that are available. Chapter two describes the statistical registers available at SCB, registers that share the common feature that they provide total coverage, i.e. they contain all 'objects' of a given type, such as population, economic activities (e.g. from statements of employees' earnings provided to the tax authorities), vehicles, enterprises or real estate. SCB has exclusive responsibility for seven of the nine registers included in the chapter, while two registers are ordered by public authorities with statistical responsibilities. Chapter three describes statistical surveys that are conducted by SCB, with the exception of the National Forest Inventory, which is carried out by the Swedish University of Agricultural Sciences. In terms of geographical breakdown, the degree of detail in the surveys varies, but all provide some possibility of reporting data at lower than the national level. The level involved may be county, municipality, yield district, coastal district or category of enterprises, e.g. aquaculture. Six of the nine surveys included in the chapter have been ordered by public authorities with statistical responsibilities, while SCB has exclusive responsibility for the others. Chapter four presents an overview of the statistics on land use maintained by SCB. This chapter does not follow the same pattern as chapters two and three but instead gives a more general account. The conclusion can be drawn that there are good prospects that SKB can make use of SCB's data as background information or in other ways when undertaking future

  14. Statistics available for site studies in registers and surveys at Statistics Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Haldorson, Marie [Statistics Sweden, Oerebro (Sweden)

    2000-03-01

    Statistics Sweden (SCB) has produced this report on behalf of the Swedish Nuclear Fuel and Waste Management Company (SKB), as part of the data to be used by SKB in conducting studies of potential sites. The report goes over the statistics obtainable from SCB in the form of registers and surveys. The purpose is to identify the variables that are available, and to specify their degree of geographical detail and the time series that are available. Chapter two describes the statistical registers available at SCB, registers that share the common feature that they provide total coverage, i.e. they contain all 'objects' of a given type, such as population, economic activities (e.g. from statements of employees' earnings provided to the tax authorities), vehicles, enterprises or real estate. SCB has exclusive responsibility for seven of the nine registers included in the chapter, while two registers are ordered by public authorities with statistical responsibilities. Chapter three describes statistical surveys that are conducted by SCB, with the exception of the National Forest Inventory, which is carried out by the Swedish University of Agricultural Sciences. In terms of geographical breakdown, the degree of detail in the surveys varies, but all provide some possibility of reporting data at lower than the national level. The level involved may be county, municipality, yield district, coastal district or category of enterprises, e.g. aquaculture. Six of the nine surveys included in the chapter have been ordered by public authorities with statistical responsibilities, while SCB has exclusive responsibility for the others. Chapter four presents an overview of the statistics on land use maintained by SCB. This chapter does not follow the same pattern as chapters two and three but instead gives a more general account. The conclusion can be drawn that there are good prospects that SKB can make use of SCB's data as background information or in other ways when undertaking future

  15. Results of the indoor radiological survey at the W.R. Grace Co., Curtis Bay site, Baltimore, Maryland

    International Nuclear Information System (INIS)

    Cottrell, W.D.; Foley, R.D.; Johnson, C.A.

    1989-07-01

    The W.R. Grace Company, Davison Chemical Division, conducted developmental research and extraction of thorium from monazite ore at its Curtis Bay facility in Baltimore, Maryland, during the 1950s under contract to the Atomic Energy Commission (AEC). Only one of the numerous buildings on the site was used for these operations. A 1979 aerial survey of the site for the Department of Energy (DOE) indicated that a comprehensive ground survey was required to determine whether or not any contamination remained from the AEC activities in that building. A radiological scoping survey performed later that year for DOE by a team from the Measurement Applications and Development Group of the Health and Safety Research Division, Oak Ridge National Laboratory (ORNL), disclosed surface contamination (alpha) levels in excess of DOE criteria on all five levels of the building. As a result of this finding, two additional surveys were performed in 1986 by ORNL at the request of DOE to evaluate any present or potential health risk. They are detailed in this report. The results of the 1986 surveys revealed several areas having elevated levels of radiation as a result of significant quantities of thorium on some building surfaces such as floors and ceiling beams. Most areas were small spots and in locations of low occupancy; thus, the possibility for significant exposure to workers was judged to be low. To confirm this evaluation, annual radiation exposure estimates for workers frequenting the few, larger contaminated areas on the site were derived using ORNL survey data and occupancy factors provided by the W.R. Grace Company. Estimates ranged from 27 to 41 mrem/yr or a maximum of 41% of the basic dose limit of 100 mrem/yr for members of the general public. 2 refs., 14 figs., 8 tabs

  16. Application of frequency- and time-domain electromagnetic surveys to characterize hydrostratigraphy and landfill construction at the Amargosa Desert Research Site, Beatty, Nevada

    Science.gov (United States)

    White, Eric A.; Day-Lewis, Frederick D.; Johnson, Carole D.; Lane, John W.

    2016-01-01

    In 2014 and 2015, the U.S. Geological Survey (USGS), conducted frequency-domain electromagnetic (FDEM) surveys at the USGS Amargosa Desert Research Site (ADRS), approximately 17 kilometers (km) south of Beatty, Nevada. The FDEM surveys were conducted within and adjacent to a closed low-level radioactive waste disposal site located at the ADRS. FDEM surveys were conducted on a grid of north-south and east-west profiles to assess the locations and boundaries of historically recorded waste-disposal trenches. In 2015, the USGS conducted time-domain (TDEM) soundings along a profile adjacent to the disposal site (landfill) in cooperation with the U.S. Environmental Protection Agency (USEPA), to assess the thickness and characteristics of the underlying deep unsaturated zone, and the hydrostratigraphy of the underlying saturated zone.FDEM survey results indicate the general location and extent of the waste-disposal trenches and reveal potential differences in material properties and the type and concentration of waste in several areas of the landfill. The TDEM surveys provide information on the underlying hydrostratigraphy and characteristics of the unsaturated zone that inform the site conceptual model and support an improved understanding of the hydrostratigraphic framework. Additional work is needed to interpret the TDEM results in the context of the local and regional structural geology.

  17. An Online Scheduling Algorithm with Advance Reservation for Large-Scale Data Transfers

    Energy Technology Data Exchange (ETDEWEB)

    Balman, Mehmet; Kosar, Tevfik

    2010-05-20

    Scientific applications and experimental facilities generate massive data sets that need to be transferred to remote collaborating sites for sharing, processing, and long term storage. In order to support increasingly data-intensive science, next generation research networks have been deployed to provide high-speed on-demand data access between collaborating institutions. In this paper, we present a practical model for online data scheduling in which data movement operations are scheduled in advance for end-to-end high performance transfers. In our model, data scheduler interacts with reservation managers and data transfer nodes in order to reserve available bandwidth to guarantee completion of jobs that are accepted and confirmed to satisfy preferred time constraint given by the user. Our methodology improves current systems by allowing researchers and higher level meta-schedulers to use data placement as a service where theycan plan ahead and reserve the scheduler time in advance for their data movement operations. We have implemented our algorithm and examined possible techniques for incorporation into current reservation frameworks. Performance measurements confirm that the proposed algorithm is efficient and scalable.

  18. Quarterly environmental radiological survey summary - first quarter 1997 100, 200, 300, and 600 areas

    International Nuclear Information System (INIS)

    Mckinney, S.M.

    1997-01-01

    This report provides a summary of the radiological surveys performed in support of near-facility environmental monitoring at the Hanford Site. The First Quarter 1997 survey results and the status of actions required are summarized below: (1) All of the routine environmental radiological surveys scheduled during January, February, and March 1997, were performed as planned. (2) One hundred four environmental radiological surveys were performed during the first quarter 1997, twenty-nine at the active waste sites and seventy-five at the inactive waste sites. Contamination above background levels was found at eight of the active waste sites and seven of the inactive waste sites. Contamination levels as high as >1,000,000 disintegrations per minute (dpm) were reported. Of these contaminated surveys twelve were in Underground Radioactive Material (URM) areas and three were in contamination areas. The contamination found within ten of the URM areas was immediately cleaned up and no further action was required. In the remaining five sites the areas were posted and will require decontamination. Radiological Problem Reports (RPR's) were issued and the sites were turned over to the landlord for further action if required. (3) During the first quarter of 1997, 5.6 hectares (13.8 acres) were stabilized and radiologically down posted from Contamination Area (CA)/Soil Contamination (SC) to URM. (4) During the first quarter of 1997, the size of 216-A-25 Gable Mountain Pond was increased from 30.4 to 34.5 hectares (75.0 to 85.2 acres). This increase in size was due to the correction of the original boundary area by using the advanced technology of a global positioning system (GPS). An area, 1.6 hectares (4.0 acres), east of and adjacent to the 241-S/SX/SY tank farm complex was posted as a contamination/soil contamination area. (5) Five open Surveillance Compliance Inspection Reports (SCIRs) had not been resolved

  19. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 5, Part B: Chapter 8, Sections 8.3.1.5 through 8.3.1.17

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the SOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules.

  20. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 5, Part B: Chapter 8, Sections 8.3.1.5 through 8.3.1.17

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the SOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules

  1. Secure Autonomous Automated Scheduling (SAAS). Rev. 1.1

    Science.gov (United States)

    Walke, Jon G.; Dikeman, Larry; Sage, Stephen P.; Miller, Eric M.

    2010-01-01

    This report describes network-centric operations, where a virtual mission operations center autonomously receives sensor triggers, and schedules space and ground assets using Internet-based technologies and service-oriented architectures. For proof-of-concept purposes, sensor triggers are received from the United States Geological Survey (USGS) to determine targets for space-based sensors. The Surrey Satellite Technology Limited (SSTL) Disaster Monitoring Constellation satellite, the UK-DMC, is used as the space-based sensor. The UK-DMC's availability is determined via machine-to-machine communications using SSTL's mission planning system. Access to/from the UK-DMC for tasking and sensor data is via SSTL's and Universal Space Network's (USN) ground assets. The availability and scheduling of USN's assets can also be performed autonomously via machine-to-machine communications. All communication, both on the ground and between ground and space, uses open Internet standards

  2. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  3. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  4. Development of new low level radioactive waste disposal sites: A progress report

    International Nuclear Information System (INIS)

    Anderson, Robert T.; Antonucci, George J.; Ryan, Michael T.

    1992-01-01

    The status of the development of three new low level radioactive waste disposal facilities for the Central Midwest (Illinois), Southeastern (North Carolina) and Appalachian (Pennsylvania) compacts is presented. These three sites will dispose of about 50-65 percent of the commercial low-level waste (LLW) generated in the U.S. annually. Chem-Nuclear, as developer and proposed operator of all three sites has used a common approach to site development. This approach has been based on their twenty-plus years of operating experience and a standard technical approach. The technology employed is an above-grade, multiple engineered barrier design. The paper also contrasts actual progress at each site with a generalized project schedule. Areas of schedule delays are noted along with the steps being taken to accelerate schedule. Finally, we note that continued progress and timely start-up of operations of these new sites is critical on a national basis. This is due to the possibility of near-term closure of the existing LLW disposal sites. (author)

  5. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.3.5 through 8.3.5.20

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 68 figs., 102 tabs.

  6. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.4 through 8.7; Glossary and Acronyms

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Section 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 88 figs., 42 tabs

  7. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 6, Part B: Chapter 8, Sections 8.3.2 through 8.3.4.4

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 35 figs., 70 tabs

  8. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.3.5 through 8.3.5.20

    International Nuclear Information System (INIS)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 68 figs., 102 tabs

  9. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.4 through 8.7; Glossary and Acronyms

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Section 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 88 figs., 42 tabs.

  10. Ornithological Survey of the Proposed Geothermal Well Site No. 2

    Energy Technology Data Exchange (ETDEWEB)

    Jeffrey, Jack

    1990-08-16

    The U.S. Fish and Wildlife Service (USFWS 1983) and the State of Hawaii (DLNR 1986) have listed as endangered six forest bird species for the Island of Hawaii. Two of these birds, the O'u (Psittirostra psittacea) and the Hawaiian hawk (Buteo solitarius) may be present within the Geothermal resource sub-zone (Scott et al. 1986). Thus, their presence could impact future development within the resource area. This report presents the results of a bird survey conducted August 11 and 12, 1990 in the sub-zone in and around the proposed well site and pad for True/Mid Pacific Geothermal Well No.2.

  11. Aerial surveys of seals at Rødsand seal sanctuary and adjacent haul-out sites

    DEFF Research Database (Denmark)

    Teilmann, J.; Dietz, R.; Edren, Susi M.C.

    This report describes the preliminary results of aerial surveys at Rødsand seal sanctuary, southeast Denmark and adjacent seal haul-out sites in southwestern Baltic. The work was carried out in connection with studies of potential effects of the Nysted offshore wind farm. Rødsand seal sanctuary...... is a part of seal management area 4, and the area is believed to hold a more or less closed population with little exchange to other areas. Although the harbour seal is relatively stationary there may be movements between the haul-out sites in the area. A possible reaction to disturbance from...... the construction and operation of the wind farm may be that the seals use other haul-out sites to a higher extend....

  12. RPAS AND TLS TECNIQUES FOR ARCHAEOLOGICAL SURVEY: THE CASE STUDY OF THE ARCHAEOLOGICAL SITE OF ERACLEA MINOA (ITALY

    Directory of Open Access Journals (Sweden)

    M. Lo Brutto

    2017-02-01

    Full Text Available Digital documentation and 3D modelling of archaeological sites are important for understanding, definition and recognition of the values of the sites and of the archaeological finds. The most part of archaeological sites are outdoor location, but a cover to preserve the ruins protects often parts of the sites. The possibility to acquire data with different techniques and merge them by using a single reference system allows creating multi-parties models in which 3D representations of the individual objects can be inserted. The paper presents the results of a recent study carried out by Geomatics Laboratory of University of Palermo for the digital documentation and 3D modelling of Eraclea Minoa archaeological site. This site is located near Agrigento, in the south of Sicily (Italy and is one of the most famous ancient Greek colonies of Sicily. The paper presents the results of the integration of different data source to survey the Eraclea Minoa archaeological site. The application of two highly versatile recording systems, the TLS (Terrestrial Laser Scanning and the RPAS (Remotely Piloted Aircraft System, allowed the Eraclea Minoa site to be documented in high resolution and with high accuracy. The integration of the two techniques has demonstrated the possibility to obtain high quality and accurate 3D models in archaeological survey.

  13. Comparison of passive soil vapor survey techniques at a Tijeras Arroyo site, Sandia National Laboratories, Albuquerque, New Mexico

    International Nuclear Information System (INIS)

    Eberle, C.S.; Wade, W.M.; Tharp, T.; Brinkman, J.

    1996-01-01

    Soil vapor surveys were performed to characterize the approximate location of soil contaminants at a hazardous waste site. The samplers were from two separate companies and a comparison was made between the results of the two techniques. These results will be used to design further investigations at the site

  14. Miscellaneous radioactive materials detected during uranium mill tailings surveys

    International Nuclear Information System (INIS)

    Wilson, M.J.

    1993-10-01

    The Department of Energy's (DOE) Office of Environmental Restoration and Waste Management directed the Oak Ridge National Laboratory Pollutant Assessments Group in the conduct of radiological surveys on properties in Monticello, Utah, associated with the Mendaciously millsite National Priority List site. During these surveys, various radioactive materials were detected that were unrelated to the Monticello millsite. The existence and descriptions of these materials were recorded in survey reports and are condensed in this report. The radioactive materials detected are either naturally occurring radioactive material, such as rock and mineral collections, uranium ore, and radioactive coal or manmade radioactive material consisting of tailings from other millsites, mining equipment, radium dials, mill building scraps, building materials, such as brick and cinderblock, and other miscellaneous sources. Awareness of the miscellaneous and naturally occurring material is essential to allow DOE to forecast the additional costs and schedule changes associated with remediation activities. Also, material that may pose a health hazard to the public should be revealed to other regulatory agencies for consideration

  15. Insight from Public Surveys Related to Siting of Nuclear Waste Facilities: An Overview of Findings from a 2015 Nationwide Survey of US Residents

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins-Smith, Hank C. [Univ. of Oklahoma, Norman, OK (United States); Gupta, Kuhika [Univ. of Oklahoma, Norman, OK (United States); Silva, Carol L. [Univ. of Oklahoma, Norman, OK (United States); Bonano, Evaristo J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Rechard, Robert P. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-09-01

    The results described in this report are an analysis of nationwide surveys, administered between 2006 and 2015, which measure preferences of US residents concerning the environment and energy sources. The Energy & Environment (EE) survey series is conducted annually by the Center for Energy, Security & Society (CES&S), a joint research collaboration of the University of Oklahoma and Sandia National Laboratories. The annual EE survey series is designed to track evolving public views on nuclear materials management in the US. The 2015 wave of the Energy and Environment survey (EE15) was implemented using a web-based questionnaire, and was completed by 2,021 respondents using an Internet sample that matches the characteristics of the adult US population as estimated in the US Census. A special focus of the EE15 survey is how survey respondents understand and evaluate “consent” in the context of the storage and transportation of spent nuclear fuel (SNF). This report presents an overview of key results from analyses of questions related to consent-based siting and other elements of the nuclear energy fuel cycle.

  16. Results of Surveys for Special Status Reptiles at the Site 300 Facilities of Lawrence Livermore National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Woollett, J J

    2008-09-18

    The purpose of this report is to present the results of a live-trapping and visual surveys for special status reptiles at the Site 300 Facilities of Lawrence Livermore National Laboratory (LLNL). The survey was conducted under the authority of the Federal recovery permit of Swaim Biological Consulting (PRT-815537) and a Memorandum of Understanding issued from the California Department of Fish and Game. Site 300 is located between Livermore and Tracy just north of Tesla road (Alameda County) and Corral Hollow Road (San Joaquin County) and straddles the Alameda and San Joaquin County line (Figures 1 and 2). It encompasses portions of the USGS 7.5 minute Midway and Tracy quadrangles (Figure 2). Focused surveys were conducted for four special status reptiles including the Alameda whipsnake (Masticophis lateralis euryxanthus), the San Joaquin Whipsnake (Masticophis Hagellum ruddock), the silvery legless lizard (Anniella pulchra pulchra), and the California horned lizard (Phrynosoma coronanum frontale).

  17. A review of metaheuristic scheduling techniques in cloud computing

    Directory of Open Access Journals (Sweden)

    Mala Kalra

    2015-11-01

    Full Text Available Cloud computing has become a buzzword in the area of high performance distributed computing as it provides on-demand access to shared pool of resources over Internet in a self-service, dynamically scalable and metered manner. Cloud computing is still in its infancy, so to reap its full benefits, much research is required across a broad array of topics. One of the important research issues which need to be focused for its efficient performance is scheduling. The goal of scheduling is to map tasks to appropriate resources that optimize one or more objectives. Scheduling in cloud computing belongs to a category of problems known as NP-hard problem due to large solution space and thus it takes a long time to find an optimal solution. There are no algorithms which may produce optimal solution within polynomial time to solve these problems. In cloud environment, it is preferable to find suboptimal solution, but in short period of time. Metaheuristic based techniques have been proved to achieve near optimal solutions within reasonable time for such problems. In this paper, we provide an extensive survey and comparative analysis of various scheduling algorithms for cloud and grid environments based on three popular metaheuristic techniques: Ant Colony Optimization (ACO, Genetic Algorithm (GA and Particle Swarm Optimization (PSO, and two novel techniques: League Championship Algorithm (LCA and BAT algorithm.

  18. Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Project in Offshore Southeast Florida

    Energy Technology Data Exchange (ETDEWEB)

    Vinick, Charles; Riccobono, Antonino, MS; Messing, Charles G., Ph.D.; Walker, Brian K., Ph.D.; Reed, John K., Ph.D.

    2012-02-28

    Dehlsen Associates, LLC was awarded a grant by the United States Department of Energy (DOE) Golden Field Office for a project titled 'Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Project in Offshore Southeast Florida,' corresponding to DOE Grant Award Number DE-EE0002655 resulting from DOE funding Opportunity Announcement Number DE-FOA-0000069 for Topic Area 2, and it is referred to herein as 'the project.' The purpose of the project was to enhance the certainty of the survey requirements and regulatory review processes for the purpose of reducing the time, efforts, and costs associated with initial siting efforts of marine and hydrokinetic energy conversion facilities that may be proposed in the Atlantic Ocean offshore Southeast Florida. To secure early input from agencies, protocols were developed for collecting baseline geophysical information and benthic habitat data that can be used by project developers and regulators to make decisions early in the process of determining project location (i.e., the siting process) that avoid or minimize adverse impacts to sensitive marine benthic habitat. It is presumed that such an approach will help facilitate the licensing process for hydrokinetic and other ocean renewable energy projects within the study area and will assist in clarifying the baseline environmental data requirements described in the U.S. Department of the Interior Bureau of Ocean Energy Management, Regulation and Enforcement (formerly Minerals Management Service) final regulations on offshore renewable energy (30 Code of Federal Regulations 285, published April 29, 2009). Because projects generally seek to avoid or minimize impacts to sensitive marine habitats, it was not the intent of this project to investigate areas that did not appear suitable for the siting of ocean renewable energy projects. Rather, a two-tiered approach was designed with the first step consisting of gaining overall insight

  19. Salt Repository Project site study plan for background environmental radioactivity: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    The Site Study Plan for Background Environmental Radioactivity describes a field program consisting of an initial radiological survey and a radiological sampling program. The field program includes measurement of direct radiation and collection and analysis of background radioactivity samples of air, precipitation, soil, water, milk, pasture grass, food crops, meat, poultry, game, and eggs. The plan describes for each study the need for the study, the study design, data management, and use, schedule of proposed activities, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document. 43 refs., 10 figs., 7 tabs

  20. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  1. Formerly utilized MED/AEC sites remedial action program. Radiological survey of the Seaway Industrial Park, Tonawanda, New York. Final report

    International Nuclear Information System (INIS)

    Leggett, R.W.; Cottrell, W.D.; Dickson, H.W.

    1978-05-01

    The results of a radiological survey of the Seaway Industrial Park, Tonawanda, New York, are presented in this report. The site is adjacent to the former Haist property, which was used to receive residues from uranium processing during the period 1944--46. In 1974 approximately 6000 yd 3 of this residue was transported to Seaway, where it was used as landfill. The survey was undertaken to determine radiation levels and the extent of radioactive materials on the Seaway property, as well as the extent of movement of radioactive residues by natural means such as surface run-off. The survey included measurement of: external gamma radiation on and near the site; beta-gamma radiation at the surface in the most contaminated areas; radium and uranium concentrations in the soil; concentrations of radium, uranium, and thorium in water samples collected from the drainage areas; and radium concentrations in mud samples taken from the drainage areas. The results indicate that the residues on the site do not pose any immediate health hazards. However, potential health hazards could result from some uses of the site. In particular, if buildings were to be built in certain areas on the site, significant concentrations of radon daughters could develop in these structures. 16 figs, 3 tables

  2. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  3. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  4. Geophysical survey aimed at selecting the radioactive waste repository site (Czech republic

    Directory of Open Access Journals (Sweden)

    Dušan Dostál

    2007-01-01

    Full Text Available G IMPULS Praha has been executing a set of geophysical measurements for the Radioactive Waste Repository Authority of the Czech Republic from 2001 (the work continues to be carried out. The measurements are aimed at studying the behaviour of the rock massif, focusing on the Excavation Damaged or Disturbed Zone (EDZ and on selecting an appropriate area for the radioactive material repository site. The geophysical studies use a complex of methods as follows: Airborne geophysical measurement (regional studies, Seismic measurement (detailed studies, G.P.R. (detailed studies, Resistivity tomography (detailed studies, Geoelectric measurement and magnetic survey (stray earth currents. The paper informs about first results and conclusions. The airborne work was executed as a part of the complex study of „GEOBARIERA“ the group and the geophysical measurements of EDZ were executed in co-operation with the Czech Geological Survey.

  5. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  6. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  7. Data analysis considerations for pesticides determined by National Water Quality Laboratory schedule 2437

    Science.gov (United States)

    Shoda, Megan E.; Nowell, Lisa H.; Stone, Wesley W.; Sandstrom, Mark W.; Bexfield, Laura M.

    2018-04-02

    In 2013, the U.S. Geological Survey National Water Quality Laboratory (NWQL) made a new method available for the analysis of pesticides in filtered water samples: laboratory schedule 2437. Schedule 2437 is an improvement on previous analytical methods because it determines the concentrations of 225 fungicides, herbicides, insecticides, and associated degradates in one method at similar or lower concentrations than previously available methods. Additionally, the pesticides included in schedule 2437 were strategically identified in a prioritization analysis that assessed likelihood of occurrence, prevalence of use, and potential toxicity. When the NWQL reports pesticide concentrations for analytes in schedule 2437, the laboratory also provides supplemental information useful to data users for assessing method performance and understanding data quality. That supplemental information is discussed in this report, along with an initial analysis of analytical recovery of pesticides in water-quality samples analyzed by schedule 2437 during 2013–2015. A total of 523 field matrix spike samples and their paired environmental samples and 277 laboratory reagent spike samples were analyzed for this report (1,323 samples total). These samples were collected in the field as part of the U.S. Geological Survey National Water-Quality Assessment groundwater and surface-water studies and as part of the NWQL quality-control program. This report reviews how pesticide samples are processed by the NWQL, addresses how to obtain all the data necessary to interpret pesticide concentrations, explains the circumstances that result in a reporting level change or the occurrence of a raised reporting level, and describes the calculation and assessment of recovery. This report also discusses reasons why a data user might choose to exclude data in an interpretive analysis and outlines the approach used to identify the potential for decreased data quality in the assessment of method recovery. The

  8. Radioactive survey of the environment of the nuclear sites of French Nuclear Board: an overview

    International Nuclear Information System (INIS)

    Robeau, D.; Montjoie, M.; Sauve, A.M.; Laporte, J.; Rahaplen, A.; Alphonse, L.; Huc, C.; Bensimon, C.; Cissoko, G.

    1992-01-01

    C.E.A. has set up a network of radioactive survey around its nuclear sites. This network involves terrestrial, atmospheric and marine results of radioactive measurements. This survey is structured in four levels. The level 0 homogenizes stations of measurements, level 1 centralizes real-time measurements of gross α and β measurements of atmospheric radioactivity, level 2 and 3 centralizes postponed α-β spectrometric measurements of radioactivity on water, deposition, grass, vegetables. People can have a squint at these results of measurements using popular MINITEL telephonic network. (author)

  9. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  10. Formerly utilized MED/AEC sites Remedial Action Program. Radiological survey of the St. Louis Airport Storage Site, St. Louis, Missouri. Final report. [U, Ra-bearing wastes stored in 1940-60's

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-09-01

    Results of two radiological surveys of the St. Louis-Lambert Airport property, formerly known as the Airport Storage Site, St. Louis, Missouri, are presented. Uranium- and radium-bearing waste materials were stored from the 1940's to the late 1960's in this area. The surveys included direct measurements of beta-gamma radiation; determination of uranium, actinium, and radium concentrations in soil samples and from bore holes; determination of radionuclide concentrations in groundwater and surface water; measurement of radon flux from the ground surface; and measurements of /sup 222/Rn in air near the site. Results indicate that some offsite drainage pathways are becoming contaminated, probably by runoff from the site; no migration of /sup 222/Rn from the site was observed.

  11. Alternative Work Schedules: Many Agencies Do Not Allow Employees the Full Flexibility Permitted by Law. Report to Congressional Committees.

    Science.gov (United States)

    General Accounting Office, Washington, DC. General Government Div.

    A review was conducted of the extent to which selected federal agencies are allowing employees to use alternative work schedules (AWS) as authorized by the Federal Employees Flexible and Compressed Work Schedules Act. The statute permits, rather than requires, agencies to institute AWS programs. The study surveyed the policies and practices of 59…

  12. Topographical survey and soil characterization of a candidate site for Radioactive Waste Repository

    International Nuclear Information System (INIS)

    Peconick, Diva Godoi de O.; Mourao, Rogerio P.

    2015-01-01

    Brazil has already initiated the establishment of a national near-surface repository for the low- and intermediate short-lived radioactive wastes generated within its territory. With two nuclear power plants in operation and a third one under construction, five active nuclear research institutes and another one planned for the intermediate future, operational constraints and social pressure built up for a disposal solution for such a waste category. The Brazilian Nuclear Commission CNEN was tasked at designing, building and commissioning this repository, which implies, among other activities, finding a suitable place for the facility. After an initial technical desk job, a federal land, not far from the NPPs, was appointed and in situ studies for the site characterization were started. This paper describes the topographical survey and soil drilling campaign carried out for the initial evaluation of the feasibility of the site vis-a-vis the applicable national regulations for site selection and disposal facilities licensing. (author)

  13. Topographical survey and soil characterization of a candidate site for Radioactive Waste Repository

    Energy Technology Data Exchange (ETDEWEB)

    Peconick, Diva Godoi de O.; Mourao, Rogerio P., E-mail: godiva@cdtn.br, E-mail: mouraor@cdtn.br [Centro de Desenvolvimento da Tecnologia Nucelar (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2015-07-01

    Brazil has already initiated the establishment of a national near-surface repository for the low- and intermediate short-lived radioactive wastes generated within its territory. With two nuclear power plants in operation and a third one under construction, five active nuclear research institutes and another one planned for the intermediate future, operational constraints and social pressure built up for a disposal solution for such a waste category. The Brazilian Nuclear Commission CNEN was tasked at designing, building and commissioning this repository, which implies, among other activities, finding a suitable place for the facility. After an initial technical desk job, a federal land, not far from the NPPs, was appointed and in situ studies for the site characterization were started. This paper describes the topographical survey and soil drilling campaign carried out for the initial evaluation of the feasibility of the site vis-a-vis the applicable national regulations for site selection and disposal facilities licensing. (author)

  14. On the Road to Improved Scheduling: Reducing the Effects of Variation in Duration

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2013-01-01

    Scheduling in onsite construction is based on commitments. Unmet commitments result in non-completions which leads to waste. Moreover, it is important that commitments are realistic to avoid both positive and negative variation in duration. Negative variation is destructive to plans and schedules...... and results in delays, while positive variation is destructive to productivity by creating unexploited gaps between activities, thus inducing unexploited capacity. By registering non-completion at three construction sites, the magnitude of activities inducing negative variation has been mapped. In total, 5424...

  15. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  16. Unsociable Work? Nonstandard Work Schedules, Family Relationships, and Children's Well-Being

    Science.gov (United States)

    Strazdins, Lyndall; Clements, Mark S.; Korda, Rosemary J.; Broom, Dorothy H.; D'Souza, Rennie M.

    2006-01-01

    Many children live in families where one or both parents work evenings, nights, or weekends. Do these work schedules affect family relationships or well-being? Using cross-sectional survey data from dual-earner Canadian families (N=4,306) with children aged 2-11 years (N=6,156), we compared families where parents worked standard weekday times with…

  17. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  18. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  19. Optimizing Training Event Schedules at Naval Air Station Fallon

    Science.gov (United States)

    2018-03-01

    Time VBA Visual Basic for Applications WTI Weapons and Tactics Instructor xiii THIS PAGE INTENTIONALLY LEFT BLANK xiv Executive Summary Naval Air...emitter inventory for each site. Constraint (3.6) ensures scheduled flight events have access to an emitter, at the proper location, required for the...flight event requests and their respective requirements into a specificmacro-enabled excel worksheet (Microsoftl, 2017). A series of VBA ( VBA , 2017

  20. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  1. Socioeconomic Site Study Plan: Draft

    International Nuclear Information System (INIS)

    1987-07-01

    Social and economic issues and concerns of the Deak Smith County site area will be evaluated during site characterization. Effects that the area could experience from a repository project include demographic, economic, community service, fiscal, and social impacts. The Socioeconomic Site Study Plan is designed to provide a strategy to assess the potential for those impacts. The Socioeconomic Site Study Plan is structured to provide an overview of the socioeconomic program requirements, objectives, and activities to be conducted during site characterization. This report will describe the study design and its rationale; data collection, management, and reporting; program schedules and milestones; site study organization and management; and quality assurance issues. 43 refs

  2. Nevada Test Site Area 25, Radiological Survey and Cleanup Project, 1974-1983 (a revised final report). Revision 1

    International Nuclear Information System (INIS)

    Miller, M.G.

    1984-12-01

    This report describes the radiological survey, decontamination and decommissioning (D and D) of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for beta plus gamma and alpha radioactive contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 9 references, 23 figures

  3. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  4. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  5. Reassessment of seismic reflection data from the Finnsjoen study site and prospectives for future surveys

    International Nuclear Information System (INIS)

    Cosma, C.; Juhlin, C.

    1994-02-01

    Reprocessing of data from the seismic reflection survey performed at Finnsjoen in 1987 show that reflection seismics is a viable technique for mapping fracture zones in crystalline rock. Application of state of the art processing algorithms clearly image a gently dipping fracture zone located in the depth interval 200-400 m. In addition, several other reflectors were imaged in the reprocessed section, both gently and steeply dipping ones. Correlations with borehole data indicate that the origin of these reflections are also fractures zones. The data acquisition procedures used at the Finnsjoen survey were basically sound and could, with minor modifications, be applied at other sites. The results indicate that both sources and receivers in future surveys should be placed in boreholes a few meter below the ground surface. 30 refs

  6. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  7. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  8. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  9. A System-Wide Approach to Physician Efficiency and Utilization Rates for Non-Operating Room Anesthesia Sites.

    Science.gov (United States)

    Tsai, Mitchell H; Huynh, Tinh T; Breidenstein, Max W; O'Donnell, Stephen E; Ehrenfeld, Jesse M; Urman, Richard D

    2017-07-01

    There has been little in the development or application of operating room (OR) management metrics to non-operating room anesthesia (NORA) sites. This is in contrast to the well-developed management framework for the OR management. We hypothesized that by adopting the concept of physician efficiency, we could determine the applicability of this clinical productivity benchmark for physicians providing services for NORA cases at a tertiary care center. We conducted a retrospective data analysis of NORA sites at an academic, rural hospital, including both adult and pediatric patients. Using the time stamps from WiseOR® (Palo Alto, CA), we calculated site utilization and physician efficiency for each day. We defined scheduling efficiency (SE) as the number of staffed anesthesiologists divided by the number of staffed sites and stratified the data into three categories (SE 1). The mean physician efficiency was 0.293 (95% CI, [0.281, 0.305]), and the mean site utilization was 0.328 (95% CI, [0.314, 0.343]). When days were stratified by scheduling efficiency (SE 1), we found differences between physician efficiency and site utilization. On days where scheduling efficiency was less than 1, that is, there are more sites than physicians, mean physician efficiency (95% CI, [0.326, 0.402]) was higher than mean site utilization (95% CI, [0.250, 0.296]). We demonstrate that scheduling efficiency vis-à-vis physician efficiency as an OR management metric diverge when anesthesiologists travel between NORA sites. When the opportunity to scale operational efficiencies is limited, increasing scheduling efficiency by incorporating different NORA sites into a "block" allocation on any given day may be the only suitable tactical alternative.

  10. Case study: Accelerated schedule for MULTI LIMS installation

    International Nuclear Information System (INIS)

    Ibsen, T.G.

    1994-05-01

    This presentation focuses on the steps taken by the Westinghouse Hanford Company to meet an accelerated schedule for configuration and implementation of the MULTI LIMS in a multiple laboratory environment. The Westinghouse Hanford Company purchased the MULTI LIMS Laboratory Information Management System in August, 1993. Hardware delivery began in October, 1993. Less than four months later, the initial configuration was released for use in two Westinghouse Hanford Company laboratories. Several major obstacles were overcome during implementation. These include information gathering for base table loading, user training, acceptance of the new system by users of a legacy system, and hardware configuration issues. In summary, steps needed to be taken to meet the accelerated implementation schedule of the MULTI LIMS at the Hanford Site. The obstacles faced were overcome through the in-depth knowledge and help of the vendor and the dedication and drive of the technical staff

  11. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  12. Trans-adapted, reliability, and validity of children fear survey schedule-dental subscale in Bahasa Indonesia

    Directory of Open Access Journals (Sweden)

    Arlette Suzy

    2015-03-01

    Full Text Available Background: The most frequently used measuring instrument for determination of dental fear in children nowadays is the children’s fear survey schedule-dental scale (CFSS-DS. Purpose: The purpose of this study was to explore the reliability and validity of the scale with Indonesian trans adapted version of the scale, thus the scale can be reliable to be used in other similar research in Indonesia. Methods: Total of 113 participants, who were parent’s 3 to 12 years old children. Children were divided into two age groups, group I 3-6 year old (83 children and group II 7-12 year old (30 children. Eighty three children from the first group were divided into first dental visit group (30 children and non first dental visit group (53 children. Test-retest approach was applied to 30 first dental visit children aged 3-6 year old. Original scale was translated to Indonesian language. Result: The result showed the high value of the Cronbach’s coefficient of internal consistency α=0.956. Three factors were extracted by screen test method with Eigen values higher than 1, which explained 93.05% variance of results. Conclusion: CFSS-DS scale is reliable and valid psychometric instrument for dental fear evaluation in children in Bahasa Indonesia. The differences between this study and those of others may appear due to many factors. Normal 0 false false false EN-US X-NONE X-NONE

  13. Surfing citizens and floating voters : Results of an online survey of visitors to political web sites during the Dutch 2002 General Elections

    NARCIS (Netherlands)

    Boogers, Marcel; Voerman, Gerrit

    This article assesses the role of political web sites in the campaign for the Dutch parliamentary elections of 2002. It presents the results of an online survey of 18,000 visitors to political Web sites to examine how far, 1) political Web sites can engage people in politics and, 2) party Web sites

  14. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  15. Results of the radiological and beryllium verification survey at the Peek Street Site, Schenectady, New York (SY001V)

    International Nuclear Information System (INIS)

    Foley, R.D.; Johnson, C.A.; Carrier, R.F.; Allred, J.F.

    1994-10-01

    At the request of the U.S. Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted an independent verification radiological and non-radioactive beryllium survey at the Peek Street site, located at 425 Peek Street, Schenectady, New York. The purpose of the survey, conducted during 1993 and continuing through January 1994, was to confirm the success of the remedial actions performed to remove any beryllium concentrations or radioactive materials in excess of the identified guidelines. The verification survey included surface gamma scans and gamma readings at one meter indoors and outdoors, alpha and beta scans inside the structure, and the collection of soil, dust and debris samples and smears for radionuclide and beryllium analyses. Results of the survey demonstrated that all radiological and beryllium measurements on the property were within applicable DOE guidelines. Based on all data collected, the industrial property at 425 Peek Street and the adjacent state-owned bike path in Schenectady, New York, conforms to all applicable radiological and non-radioactive beryllium guidelines established for this site by DOE and approved by the State of New York

  16. Office of Civilian Radioactive Waste Management Program Cost and Schedule Baseline

    International Nuclear Information System (INIS)

    1992-09-01

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive (Level 0) and Program (Level 1) Change Control Boards (CCBS) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD), the Waste Management System Requirements (WMSR), and the Physical System Requirements documents provide the technical basis for the PCSB. Changes to the PCSB will be approved by the Pregrain Change Control Board (PCCB)In addition to the PCCB, the Energy System Acquisition Advisory Board Baseline CCB (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project and the Monitored Retrievable Storage (MRS) Project

  17. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1989

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-31

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  18. Results of the independent radiological verification survey at the former Associate Aircraft Tool and Manufacturing Company site, Fairfield, Ohio (FOH001)

    International Nuclear Information System (INIS)

    Rice, D.E.; Murray, M.E.; Brown, K.S.

    1996-01-01

    The former Associate Aircraft Tool and Manufacturing Company site is located at 3550 Dixie Highway, Fairfield, Ohio. Associate Aircraft Tool and Manufacturing Company produced hollow uranium slugs in a machine shop at the site in 1956. The work was performed for National Lead of Ohio in a contract with the Atomic Energy Commission to augment the capacity of the Feed Materials Production Center at Fernald in the development of nuclear energy for defense-related projects. The current occupant of the building, Force Control, operates a multipurpose machine shop. At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted an independent radiological verification survey at the former Associate Aircraft Tool and Manufacturing Company Site, Fairfield, Ohio. The survey was performed from February to May of 1995. The purpose of the survey was to verify that radioactivity from residues of 238 U was remediated to a level below acceptable DOE guidelines levels

  19. An aerial radiological survey of the Double Track Site and surrounding area. Central Nevada

    International Nuclear Information System (INIS)

    Hendricks, T.J.

    1995-07-01

    An aerial radiological survey of the Double Track Site was conducted in December 1993. An interim report was issued. That report described survey procedures and presented terrestrial exposure rate and wide-area-averaged plutonium isopleth plots. This letter report presents additional plutonium plots and some ''rule-of-thumb'' calculations which should help the reader to properly interpret the data presented. Attached to this report are three isopleth plots produced from the Double Track data. No one processing method provides all the answers regarding a particular surveyed area. Where peak values are most important, isopleth number-sign 1, created from the original unsmoothed data, is the presentation of choice. Isopleth number-sign 2, from smoothed data, is superior for the detection of areas of widespread low-level contamination. Isopleth number-sign 3, also smoothed data, satisfied a particular early mission goal but is not as useful for cleanup operations as the other two

  20. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  1. Generation and Demand Scheduling for a Grid-Connected Hybrid Microgrid Considering Price-based Incentives

    DEFF Research Database (Denmark)

    Hernández, Adriana Carolina Luna; Aldana, Nelson Leonardo Diaz; Savaghebi, Mehdi

    2017-01-01

    Microgrids rely on energy management levels to optimally schedule their components. Conventionally, the research in this field has been focused on the optimal formulation of the generation or the demand side management separately without considering real case scenarios and validated only...... by simulation. This paper presents the power scheduling of a real site microgrid under a price-based demand response program defined in Shanghai, China managing generation and demand simultaneously. The proposed optimization problem aims to minimize operating cost by managing renewable energy sources as well...

  2. Programmatic Variation in Home Hemodialysis in Canada: Results from a Nationwide Survey of Practice Patterns

    Directory of Open Access Journals (Sweden)

    Robert P Pauly

    2014-06-01

    Full Text Available Background: Over 40% of patients with end stage renal disease in the United States were treated with home hemodialysis (HHD in the early 1970's. However, this number declined rapidly over the ensuing decades so that the overwhelming majority of patients were treated in-centre 3 times per week on a 3–4 hour schedule. Poor outcomes for patients treated in this fashion led to a renewed interest in home hemodialysis, with more intensive dialysis schedules including short daily (SDHD and nocturnal (NHD. The relative infancy of these treatment schedules means that there is a paucity of data on ‘how to do it’. Objective: We undertook a systematic survey of home hemodialysis programs in Canada to describe current practice patterns. Design: Development and deployment of a qualitative survey instrument. Setting: Community and academic HHD programs in Canada. Participants: Physicians, nurses and technologists. Measurements: Programmatic approaches to patient selection, delivery of dialysis, human resources available, and follow up. Methods: We developed the survey instrument in three phases. A focus group of Canadian nephrologists with expertise in NHD or SDHD discussed the scope the study and wrote questions on 11 domains. Three nephrologists familiar with all aspects of HHD delivery reviewed this for content validity, followed by further feedback from the whole group. Multidisciplinary teams at three sites pretested the survey and further suggestions were incorporated. In July 2010 we distributed the survey electronically to all renal programs known to offer HHD according to the Canadian Organ Replacement Registry. We compiled the survey results using qualitative and quantitative methods, as appropriate. Results: Of the academic and community programs that were invited to participate, 80% and 63%, respectively, completed the survey. We observed wide variation in programmatic approaches to patient recruitment, human resources, equipment, water

  3. An aerial radiological survey of Par Pond and associated drainage pathways of the Savannah River Site, Aiken, South Carolina

    International Nuclear Information System (INIS)

    1992-12-01

    The first of a three-phase effort to radiologically monitor the lowering of Par Pond and associated drainage pathways was conducted over three areas of the Savannah River Site (SRS). The areas surveyed during this first phase included Par Pond, the Savannah River swamp from Steel Creek to Little Hell Landing, and Lower Three Runs Creek from the mouth of Lower Three Runs to the Highway 301 Bridge. The first phase was conducted to coincide with the lowering of the water level of Par Pond to an elevation of 190 feet above sea level. Additional surveys were conducted when the water level was at an elevation of 180 feet and prior to refill. The first survey began August 19, 1991, and was completed September 11, 1991. The second survey was conducted in October/November, 1991, during the SRS site-wide survey, and the third survey was conducted in August/September, 1992. Only the Par Pond area itself was surveyed during the third and final phase. The radiation detected over the Creek Plantation portion of the Savannah River swamp and Lower Three Runs areas during the August 1991 survey was consistent with the spatial distribution, quantity, and kinds of radionuclides detected during the 1983 and 1986 surveys. No migration of man-made gamma emitting materials was detected when compared to the prior surveys. The major differences occurred along the Par Pond shoreline where lowered water levels exposed the contaminated pond bed. The activity in the pond bed was attenuated by the water cover prior to the start of the lowering of Par Pond in June 1991. The data collected during each survey were processed in the field and were presented to SRS. A comparison report is being generated after the completion of each survey. A final report will be generated for the three surveys and will include a quantitative comparison of the three surveys in the Par Pond area only

  4. Remote site survey and characterization for the National ER ampersand WM Program using the SRIP [Solider Robot Interface Project] vehicle

    International Nuclear Information System (INIS)

    Richardson, B.S.; Killough, S.M.; Emery, M.D.; Herndon, J.N.; Hamel, W.R.; Burks, B.L.

    1990-01-01

    A significant number of Department of Energy (DOE) production and research sites will require remediation of buried waste sites during the coming years. An important first step in cleanup, restoration, and decontamination activities is burial site characterization. An early field demonstration of buried waste site survey and characterization will be conducted using a remotely operated vehicle equipped with sensors, a manipulator system, and a vision system. This demonstration will be conducted in July 1990. 4 refs., 4 figs

  5. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  6. Psychosocial stress and multi-site musculoskeletal pain: a cross-sectional survey of patient care workers.

    Science.gov (United States)

    Sembajwe, Grace; Tveito, Torill Helene; Hopcia, Karen; Kenwood, Christopher; O'Day, Elizabeth Tucker; Stoddard, Anne M; Dennerlein, Jack T; Hashimoto, Dean; Sorensen, Glorian

    2013-03-01

    The aim of this study was to assess the relationship between psychosocial factors at work and multi-site musculoskeletal pain among patient care workers. In a survey of 1,572 workers from two hospitals, occupational psychosocial factors and health outcomes of workers with single and multi-site pain were evaluated using items from the Job Content Questionnaire that was designed to measure psychological demands, decision latitude, and social support. An adapted Nordic Questionnaire provided data on the musculoskeletal pain outcome. Covariates included body mass index, age, gender, and occupation. The analyses revealed statistically significant associations between psychosocial demands and multi-site musculoskeletal pain among patient care associates, nurses, and administrative personnel, both men and women. Supervisor support played a significant role for nurses and women. These results remained statistically significant after adjusting for covariates. These results highlight the associations between workplace psychosocial strain and multi-site musculoskeletal pain, setting the stage for future longitudinal explorations. Copyright 2013, SLACK Incorporated.

  7. Launching the Next Generation IODP Site Survey Data Bank

    Science.gov (United States)

    Miller, S. P.; Helly, J.; Clark, D.; Eakins, B.; Sutton, D.; Weatherford, J.; Thatch, G.; Miville, B.; Zelt, B.

    2005-12-01

    The next generation all-digital Site Survey Data Bank (SSDB) became operational on August 15, 2005 as an online resource for Integrated Ocean Drilling Program (IODP) proponents, reviewers, panels and operations, worldwide. There are currently 123 active proposals for drilling at sites distributed across the globe, involving nearly 1000 proponents from more than 40 countries. The goal is to provide an authoritative, persistent, secure, password-controlled and easily-used home for contributed data objects, as proposals evolve through their life cycle from preliminary phases to planned drilling expeditions. Proposal status can be monitored graphically by proposal number, data type or date. A Java SSDBviewer allows discovery of all proposal data objects, displayed over a basemap of global topography, crustal age or other custom maps. Data can be viewed or downloaded under password control. Webform interfaces assist with the uploading of data and metadata. Thirty four different standard data types are currently supported. The system was designed as a fully functioning digital library, not just a database or a web archive, drawing upon the resources of the SIOExplorer Digital Library project. Blocks of metadata are organized to support discovery and use, as appropriate for each data type. The SSDB has been developed by a UCSD team of researchers and computer scientists at the Scripps Institution of Oceanography and the San Diego Supercomputer Center, under contract with IODP Management International Inc., supported by NSF OCE 0432224.

  8. AERIAL RADIOLOGICAL SURVEYS

    International Nuclear Information System (INIS)

    Proctor, A.E.

    1997-01-01

    Measuring terrestrial gamma radiation from airborne platforms has proved to be a useful method for characterizing radiation levels over large areas. Over 300 aerial radiological surveys have been carried out over the past 25 years including U.S. Department of Energy (DOE) sites, commercial nuclear power plants, Formerly Utilized Sites Remedial Action Program/Uranium Mine Tailing Remedial Action Program (FUSRAP/UMTRAP) sites, nuclear weapons test sites, contaminated industrial areas, and nuclear accident sites. This paper describes the aerial measurement technology currently in use by the Remote Sensing Laboratory (RSL) for routine environmental surveys and emergency response activities. Equipment, data-collection and -analysis methods, and examples of survey results are described

  9. Nevada Test Site Site Treatment Plan. Revision 2

    International Nuclear Information System (INIS)

    1996-03-01

    Treatment Plans (STPS) are required for facilities at which the US Department of Energy (DOE) or stores mixed waste, defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act and a radioactive material subject to the Atomic Energy Act. On April 6, 1993, DOE published a Federal Register notice (58 FR 17875) describing its proposed process for developing the STPs in three phases including a Conceptual, a Draft, and a Proposed Site Treatment Plan (PSTP). All of the DOE Nevada Operations Office STP iterations have been developed with the state of Nevada's input. The options and schedules reflect a ''bottoms-up'' approach and have been evaluated for impacts on other DOE sites, as well as impacts to the overall DOE program. Changes may have occurred in the preferred option and associated schedules between the PSTP, which was submitted to the state of Nevada and US Environmental Protection Agency April 1995, and the Final STP (hereafter referred to as the STP) as treatment evaluations progressed. The STP includes changes that have occurred since the submittal of the PSTP as a result of state-to-state and DOE-to-state discussions

  10. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  11. Improved Space Surveillance Network (SSN) Scheduling using Artificial Intelligence Techniques

    Science.gov (United States)

    Stottler, D.

    There are close to 20,000 cataloged manmade objects in space, the large majority of which are not active, functioning satellites. These are tracked by phased array and mechanical radars and ground and space-based optical telescopes, collectively known as the Space Surveillance Network (SSN). A better SSN schedule of observations could, using exactly the same legacy sensor resources, improve space catalog accuracy through more complementary tracking, provide better responsiveness to real-time changes, better track small debris in low earth orbit (LEO) through efficient use of applicable sensors, efficiently track deep space (DS) frequent revisit objects, handle increased numbers of objects and new types of sensors, and take advantage of future improved communication and control to globally optimize the SSN schedule. We have developed a scheduling algorithm that takes as input the space catalog and the associated covariance matrices and produces a globally optimized schedule for each sensor site as to what objects to observe and when. This algorithm is able to schedule more observations with the same sensor resources and have those observations be more complementary, in terms of the precision with which each orbit metric is known, to produce a satellite observation schedule that, when executed, minimizes the covariances across the entire space object catalog. If used operationally, the results would be significantly increased accuracy of the space catalog with fewer lost objects with the same set of sensor resources. This approach inherently can also trade-off fewer high priority tasks against more lower-priority tasks, when there is benefit in doing so. Currently the project has completed a prototyping and feasibility study, using open source data on the SSN's sensors, that showed significant reduction in orbit metric covariances. The algorithm techniques and results will be discussed along with future directions for the research.

  12. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  13. Radiological survey of the former Baker Brothers, Inc. site, 2551--2555 Harleau Place, Toledo, Ohio (BTO001)

    International Nuclear Information System (INIS)

    Foley, R.D.; Floyd, L.M.

    1992-03-01

    At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted investigative radiological surveys at the REMS, Inc., and the Doug Beet Company, 2551-2555 Harleau Place, Toledo, Ohio (BTO001) in 1988. The purpose of the surveys was to determine whether the property was contaminated with radioactive residues, principally 238 U, as a result of work contracted to the Manhattan Engineer District (MED). The survey included gamma scans; directly measured alpha, beta, and gamma radiation levels; transferable contamination levels; and soil, dust, debris, and air sampling for radionuclide analyses. The survey and sampling covered accessible portions of the exterior ground surface, roof, and interiors of buildings. Results of the surveys demonstrated four general areas having radionuclide concentrations in excess of the DOE Formerly Utilized Sites Remedial Action Program criteria for 238 U outdoors and as surface contamination on shelves in one building

  14. Investigation of CTBT OSI Radionuclide Techniques at the DILUTED WATERS Nuclear Test Site

    Energy Technology Data Exchange (ETDEWEB)

    Baciak, James E.; Milbrath, Brian D.; Detwiler, Rebecca S.; Kirkham, Randy R.; Keillor, Martin E.; Lepel, Elwood A.; Seifert, Allen; Emer, Dudley; Floyd, Michael

    2012-11-01

    Under the Comprehensive Nuclear-Test-Ban Treaty (CTBT), a verification regime that includes the ability to conduct an On-Site Inspection (OSI) will be established. The Treaty allows for an OSI to include many techniques, including the radionuclide techniques of gamma radiation surveying and spectrometry and environmental sampling and analysis. Such radioactivity detection techniques can provide the “smoking gun” evidence that a nuclear test has occurred through the detection and quantification of indicative recent fission products. An OSI faces restrictions in time and manpower, as dictated by the Treaty; not to mention possible logistics difficulties due to the location and climate of the suspected explosion site. It is thus necessary to have a good understanding of the possible source term an OSI will encounter and the proper techniques that will be necessary for an effective OSI regime. One of the challenges during an OSI is to locate radioactive debris that has escaped an underground nuclear explosion (UNE) and settled on the surface near and downwind of ground zero. To support the understanding and selection of sampling and survey techniques for use in an OSI, we are currently designing an experiment, the Particulate Release Experiment (PRex), to simulate a small-scale vent from an underground nuclear explosion. PRex will occur at the Nevada National Security Site (NNSS). The project is conducted under the National Center for Nuclear Security (NCNS) funded by the National Nuclear Security Agency (NNSA). Prior to the release experiment, scheduled for Spring of 2013, the project scheduled a number of activities at the NNSS to prepare for the release experiment as well as to utilize the nuclear testing past of the NNSS for the development of OSI techniques for CTBT. One such activity—the focus of this report—was a survey and sampling campaign at the site of an old UNE that vented: DILUTED WATERS. Activities at DILUTED WATERS included vehicle-based survey

  15. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  16. A Survey of the Usability of Digital Reference Services on Academic Health Science Library Web Sites

    Science.gov (United States)

    Dee, Cheryl; Allen, Maryellen

    2006-01-01

    Reference interactions with patrons in a digital library environment using digital reference services (DRS) has become widespread. However, such services in many libraries appear to be underutilized. A study surveying the ease and convenience of such services for patrons in over 100 academic health science library Web sites suggests that…

  17. Efforts to earn public support and confidence in Hanford site cleanup work

    International Nuclear Information System (INIS)

    Brown, M.C.; Edwards, C.; Beers, A.A.

    1991-01-01

    Public involvement is needed for Hanford Site cleanup to succeed. If people do not know about, understand, and support cleanup, it will be more difficult and expensive. The Tri-Party Agreement (1) calls for public involvement in decisions about cleanup options and schedules. This paper defines what public involvement means and how the Washington State Department of Ecology (Ecology), US Environmental Protection Agency (EPA), and US Department of Energy (DOE) have conducted it. Experience and survey research have shown ways to improve our performance. While we have improved our conduct of public meetings, we must identify other ways to involve the public. Efforts continue to open decision making earlier in the decision process, to share information that is clear and understandable, and to open the channels of communication. We have made good progress. We have many opportunities to continue to improve. This paper describes some of the highlights and lessons learned in public involvement in Hanford Site cleanup

  18. Effort to earn public support and confidence in Hanford Site cleanup work

    International Nuclear Information System (INIS)

    Brown, M.C.; Edwards, C.; Beers, A.A.

    1991-09-01

    Public involvement is needed for Hanford Site cleanup to succeed. If people do not know about, understand, and support cleanup, it will be more difficult and expensive. The Tri-Party Agreement calls for public involvement in decisions about cleanup options and schedules. This paper defines what public involvement means and how the Washington State Department of Ecology (Ecology), US Environmental Protection Agency (EPA), and US Department of Energy (DOE) have conducted it. Experience and survey research have shown ways to improve our performance. While we have improved our conduct of public meetings, we must identify other ways to involve the public. Efforts continue to open decision making earlier in the decision process, to share information that is clear and understandable, and to open the channels of communication. We have made good progress. We have many opportunities to continue to improve. This paper describes some of the highlights and lessons learned in public involvement in Hanford Site cleanup. 4 refs

  19. Assessing hospital disaster preparedness: a comparison of an on-site survey, directly observed drill performance, and video analysis of teamwork.

    Science.gov (United States)

    Kaji, Amy H; Langford, Vinette; Lewis, Roger J

    2008-09-01

    There is currently no validated method for assessing hospital disaster preparedness. We determine the degree of correlation between the results of 3 methods for assessing hospital disaster preparedness: administration of an on-site survey, drill observation using a structured evaluation tool, and video analysis of team performance in the hospital incident command center. This was a prospective, observational study conducted during a regional disaster drill, comparing the results from an on-site survey, a structured disaster drill evaluation tool, and a video analysis of teamwork, performed at 6 911-receiving hospitals in Los Angeles County, CA. The on-site survey was conducted separately from the drill and assessed hospital disaster plan structure, vendor agreements, modes of communication, medical and surgical supplies, involvement of law enforcement, mutual aid agreements with other facilities, drills and training, surge capacity, decontamination capability, and pharmaceutical stockpiles. The drill evaluation tool, developed by Johns Hopkins University under contract from the Agency for Healthcare Research and Quality, was used to assess various aspects of drill performance, such as the availability of the hospital disaster plan, the geographic configuration of the incident command center, whether drill participants were identifiable, whether the noise level interfered with effective communication, and how often key information (eg, number of available staffed floor, intensive care, and isolation beds; number of arriving victims; expected triage level of victims; number of potential discharges) was received by the incident command center. Teamwork behaviors in the incident command center were quantitatively assessed, using the MedTeams analysis of the video recordings obtained during the disaster drill. Spearman rank correlations of the results between pair-wise groupings of the 3 assessment methods were calculated. The 3 evaluation methods demonstrated

  20. The impact of exposure to shift-based schedules on medical students

    Directory of Open Access Journals (Sweden)

    David A. Williams

    2015-06-01

    Full Text Available Background: With new resident duty-hour regulations, resident work schedules have progressively transitioned towards shift-based systems, sometimes resulting in increased team fragmentation. We hypothesized that exposure to shift-based schedules and subsequent team fragmentation would negatively affect medical student experiences during their third-year internal medicine clerkship. Design: As part of a larger national study on duty-hour reform, 67 of 150 eligible third-year medical students completed surveys about career choice, teaching and supervision, assessment, patient care, well-being, and attractiveness of a career in internal medicine after completing their internal medicine clerkship. Students who rotated to hospitals with shift-based systems were compared to those who did not. Non-demographic variables used a five-point Likert scale. Chi-squared and Fisher's exact tests were used to assess the relationships between exposure to shift-based schedules and student responses. Questions with univariate p≤0.1 were included in multivariable logistic regression models. Results: Thirty-six students (54% were exposed to shift-based schedules. Students exposed to shift-based schedules were less likely to perceive that their attendings were committed to teaching (odds ratio [OR] 0.35, 95% confidence interval [CI]: 0.13–0.90, p=0.01 or perceive that residents had sufficient exposure to assess their performance (OR 0.29, 95% CI: 0.09–0.91, p=0.03. However, those students were more likely to feel their interns were able to observe them at the bedside (OR 1.89, 95% CI: 1.08–3.13, p=0.02 and had sufficient exposure to assess their performance (OR 3.00, 95% CI: 1.01–8.86, p=0.05. Conclusions: These findings suggest that shift-based schedules designed in response to duty-hour reform may have important broader implications for the teaching environment.

  1. The impact of exposure to shift-based schedules on medical students.

    Science.gov (United States)

    Williams, David A; Kogan, Jennifer R; Hauer, Karen E; Yamashita, Traci; Aagaard, Eva M

    2015-01-01

    With new resident duty-hour regulations, resident work schedules have progressively transitioned towards shift-based systems, sometimes resulting in increased team fragmentation. We hypothesized that exposure to shift-based schedules and subsequent team fragmentation would negatively affect medical student experiences during their third-year internal medicine clerkship. As part of a larger national study on duty-hour reform, 67 of 150 eligible third-year medical students completed surveys about career choice, teaching and supervision, assessment, patient care, well-being, and attractiveness of a career in internal medicine after completing their internal medicine clerkship. Students who rotated to hospitals with shift-based systems were compared to those who did not. Non-demographic variables used a five-point Likert scale. Chi-squared and Fisher's exact tests were used to assess the relationships between exposure to shift-based schedules and student responses. Questions with univariate p ≤ 0.1 were included in multivariable logistic regression models. Thirty-six students (54%) were exposed to shift-based schedules. Students exposed to shift-based schedules were less likely to perceive that their attendings were committed to teaching (odds ratio [OR] 0.35, 95% confidence interval [CI]: 0.13-0.90, p = 0.01) or perceive that residents had sufficient exposure to assess their performance (OR 0.29, 95% CI: 0.09-0.91, p = 0.03). However, those students were more likely to feel their interns were able to observe them at the bedside (OR 1.89, 95% CI: 1.08-3.13, p = 0.02) and had sufficient exposure to assess their performance (OR 3.00, 95% CI: 1.01-8.86, p = 0.05). These findings suggest that shift-based schedules designed in response to duty-hour reform may have important broader implications for the teaching environment.

  2. DECISION ANALYSIS OF INCINERATION COSTS IN SUPERFUND SITE REMEDIATION

    Science.gov (United States)

    This study examines the decision-making process of the remedial design (RD) phase of on-site incineration projects conducted at Superfund sites. Decisions made during RD affect the cost and schedule of remedial action (RA). Decision analysis techniques are used to determine the...

  3. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  4. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 1

    International Nuclear Information System (INIS)

    Lambert, K.A.; Mitchell, M.M.; Jean, D.; Brown, C.; Byrd, C.S.

    1997-09-01

    This report describes the survey and removal of radioactive surface contamination at Sandia's Environmental Restoration (ER) sites. Radiological characterization was performed as a prerequisite to beginning the Resource Conservation and Recovery Act (RCRA) corrective action process. The removal of radioactive surface contamination was performed in order to reduce potential impacts to human health and the environment. The predominant radiological contaminant of concern was depleted uranium (DU). Between October 1993 and November 1996 scanning surface radiation surveys, using gamma scintillometers, were conducted at 65 sites covering approximately 908 acres. A total of 9,518 radiation anomalies were detected at 38 sites. Cleanup activities were conducted between October 1994 and November 1996. A total of 9,122 anomalies were removed and 2,072 waste drums were generated. The majority of anomalies not removed were associated with a site that has subsurface contamination beyond the scope of this project. Verification soil samples (1,008 total samples) were collected from anomalies during cleanup activities and confirm that the soil concentration achieved in the field were far below the target cleanup level of 230 pCi/g of U-238 (the primary constituent of DU) in the soil. Cleanup was completed at 21 sites and no further radiological action is required. Seventeen sites were not completed since cleanup activities wee precluded by ongoing site activity or were beyond the original project scope

  5. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Lambert, K.A.; Mitchell, M.M. [Brown and Root Environmental, Albuquerque, NM (United States); Jean, D. [MDM/Lamb, Inc., Albuquerque, NM (United States); Brown, C. [Environmental Dimensions, Inc., Albuquerque, NM 87109 (United States); Byrd, C.S. [Sandia National Labs., Albuquerque, NM (United States)

    1997-09-01

    This report describes the survey and removal of radioactive surface contamination at Sandia`s Environmental Restoration (ER) sites. Radiological characterization was performed as a prerequisite to beginning the Resource Conservation and Recovery Act (RCRA) corrective action process. The removal of radioactive surface contamination was performed in order to reduce potential impacts to human health and the environment. The predominant radiological contaminant of concern was depleted uranium (DU). Between October 1993 and November 1996 scanning surface radiation surveys, using gamma scintillometers, were conducted at 65 sites covering approximately 908 acres. A total of 9,518 radiation anomalies were detected at 38 sites. Cleanup activities were conducted between October 1994 and November 1996. A total of 9,122 anomalies were removed and 2,072 waste drums were generated. The majority of anomalies not removed were associated with a site that has subsurface contamination beyond the scope of this project. Verification soil samples (1,008 total samples) were collected from anomalies during cleanup activities and confirm that the soil concentration achieved in the field were far below the target cleanup level of 230 pCi/g of U-238 (the primary constituent of DU) in the soil. Cleanup was completed at 21 sites and no further radiological action is required. Seventeen sites were not completed since cleanup activities wee precluded by ongoing site activity or were beyond the original project scope.

  6. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  7. Schedules of Controlled Substances: Temporary Placement of ortho-Fluorofentanyl, Tetrahydrofuranyl Fentanyl, and Methoxyacetyl Fentanyl Into Schedule I. Temporary amendment; temporary scheduling order.

    Science.gov (United States)

    2017-10-26

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioids, N-(2-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)propionamide (ortho-fluorofentanyl or 2-fluorofentanyl), N-(1-phenethylpiperidin-4-yl)-N-phenyltetrahydrofuran-2-carboxamide (tetrahydrofuranyl fentanyl), and 2-methoxy-N-(1-phenethylpiperidin-4-yl)-N-phenylacetamide (methoxyacetyl fentanyl), into Schedule I. This action is based on a finding by the Administrator that the placement of ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl into Schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to Schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, ortho-fluorofentanyl, tetrahydrofuranyl fentanyl, and methoxyacetyl fentanyl.

  8. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  9. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  10. Formerly utilized MED/AEC sites Remedial Action Program. Radiological survey of the former Watertown Arsenal property GSA site Watertown, Massachusetts

    International Nuclear Information System (INIS)

    Wynveen, R.A.; Smith, W.H.; Sholeen, C.M.; Justus, A.L.; Flynn, K.F.

    1983-10-01

    The complete radiological survey of all the buildings located on the GSA site revealed no contamination. However, significant contamination was found on the site grounds. A total of approximately 6 m 2 of surface area exhibited elevated radiation levels. The area of contamination is centered around Section I (the burn area) and spreads out from this point. The contamination includes the subsurface, descending to the water table at the 6-ft level in some places. The contamination is primarily reprocessed depleted uranium. The ambient radiation level in the vicinity of the contamination as measured with a pressurized ionization chamber is significantly above background levels (up to 18 μR/h). As expected, no significant levels of radon contamination were found in any of the air samples. These levels of contamination of exceed the criteria as defined in ANSI 13.12 and the NRC Guidelines. The ambient radiation levels (up to 18 μR/h) are not in excess of criteria as defined in Appendix 6

  11. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  12. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  13. Geochemical survey of an illegal waste disposal site under a waste emergency scenario (Northwest Naples, Italy).

    Science.gov (United States)

    Ferrara, L; Iannace, M; Patelli, A M; Arienzo, M

    2013-03-01

    Since the mid 1980s, Naples and the Campania region have suffered from the dumping of wastes into overfilled landfills. The aim was to characterise a former cave located in Roccarainola (Naples, Italy) for its eventual destination to a controlled landfill site. A detailed hydro-geochemical survey of the area was carried out through drilling of 14 boreholes and four monitoring wells. Samples of water, sediment and soil were analysed for heavy metals and organic contaminants from a dew pond placed in the middle of the cave. The underneath aquifer was also surveyed. The nature of gases emitted from the site was investigated. Results of the geognostic survey revealed the presence of huge volumes of composite wastes, approximately half a million of cubic metre, which accumulated up to a thickness of 25.6 m. In some points, wastes lie below the free surface level of the aquifer. The sampled material from the boreholes revealed levels of As, Cd, Cr, Cu, Hg, Pb, Sn, Tl and Zn exceeding the intervention legal limits. Outstanding loads of Cd, Pb and Zn were found, with levels exceeding of about 50, 100 and 1,870 times the limit. In several points, polycyclic aromatic hydrocarbon load was extremely high, 35 vs 1 mg kg(-1) of the threshold. The aquifer was also very heavily polluted by Cd, Cr-tot, Cu, Fe, Mn, Ni, Pb and Zn, with impressive high load of Cr and Mn, up to 250-370 times the limits. Hot gases up to 62 °C with presence of xylene and ethylbenzene were found. Results indicated that the site needs an urgent intervention of recovery to avoid compromising the surrounding areas and aquifers of the Campania plain.

  14. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  15. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  16. Prioritizing and scheduling Portsmouth Gaseous Diffusion Plant safeguards upgrades

    International Nuclear Information System (INIS)

    Edmunds, T.; Saleh, R.; Zevanove, S.

    1992-02-01

    As part of the Site Safeguards and Security Plan (SSSP), facilities are required to develop a Resource Plan (RP). The Resource Plan provides documentation and justification for the facility's planned upgrades, including the schedule, priority, and cost estimates for the safeguards and security upgrades. Portsmouth Gaseous Diffusion Plant (PORTS) management has identified and obtained funding approval for a number of safeguards and security upgrades, including line-item construction projects. These upgrade projects were selected to address a variety of concerns identified in the PORTS vulnerability assessments and other reviews performed in support of the SSSP process. However, budgeting and scheduling constraints do not make it possible to simultaneously begin implementation of all of the upgrade projects. A formal methodology and analysis are needed to explicitly address the trade-offs between competing safeguards objectives, and to prioritize and schedule the upgrade projects to ensure that the maximum benefit can be realized in the shortest possible time frame. The purpose of this report is to describe the methodology developed to support these upgrade project scheduling decisions. The report also presents the results obtained from applying the methodology to a set of the upgrade projects selected by PORTS S ampersand S management. Data for the analysis are based on discussions with personnel familiar with the PORTS safeguards and security needs, the requirements for implementing these upgrades, and upgrade funding limitations. The analysis results presented here assume continued highly enriched uranium (HEU) operations at PORTS. However, the methodology developed is readily adaptable for the evaluation of other operational scenarios and other resource allocation issues relevant to PORTS

  17. Savannah River Site environmental data for 1993

    Energy Technology Data Exchange (ETDEWEB)

    Arnett, M.W. [ed.

    1994-05-01

    The figures and tables in this report represent a capsule view of the routine environmental monitoring and surveillance programs at the Savannah River Site. An attempt has been made to include all available data from environmental research programs. The first section of the book is a collection of maps of radiological and nonradiological sampling locations. Also included are general radiological and nonradiological sampling and analysis schedules; a list of the media sampled, along with sample sizes and representative aliquots; a list of the lower limits of detection for radiological detection instruments; the minimum detectable concentrations for gamma analysis of water and air samples; and the minimum detectable concentrations for gamma analysis of soil, food, fish and wildlife, and vegetation samples. Following the first section are data tables containing radiological and nonradiological effluent monitoring results, radiological and nonradiological environmental surveillance results, dose estimates, quality assurance activities, and results of nonroutine occurrences and special surveys.

  18. Associations Among Work and Family Health Climate, Health Behaviors, Work Schedule, and Body Weight.

    Science.gov (United States)

    Buden, Jennifer C; Dugan, Alicia G; Faghri, Pouran D; Huedo-Medina, Tania B; Namazi, Sara; Cherniack, Martin G

    2017-06-01

    Correctional employees exhibit elevated obesity rates. This study examines interrelations among health behaviors, health climate, body mass index (BMI), and work schedule. Using survey results from correctional supervisors (n = 157), mediation and moderated-mediation analyses were performed to examine how health behaviors explain relationships between obesity, work health climate (WHC) and family health climate (FHC), and work schedule. Over 85% of the sample was overweight/obese (mean BMI = 30.20). Higher WHC and FHC were associated with lower BMI, mediated by nutrition, and physical activity. The interaction effect between health behavior and work schedule revealed a protective effect on BMI. Overtime shift work may share a relationship with BMI. Findings may have implications for reexamining organizational policies on maximum weekly overtime in corrections. They provide direction for targeted obesity interventions that encourage a supportive FHC and promote healthy behaviors among supervisors working overtime.

  19. Associations among Work and Family Health Climate, Health Behaviors, Work Schedule and Body Weight

    Science.gov (United States)

    Buden, Jennifer C.; Dugan, Alicia G.; Faghri, Pouran D.; Huedo-Medina, Tania B.; Namazi, Sara; Cherniack, Martin G.

    2017-01-01

    Objectives Correctional employees exhibit elevated obesity rates. This study examines interrelations among health behaviors, health climate, BMI, and work schedule. Methods Using survey results from correctional supervisors (n=157), mediation and moderated-mediation analyses were performed to examine how health behaviors explain relationships between obesity, work health climate (WHC) and family health climate (FHC), and work schedule. Results Over 85% of the sample was overweight/obese (mean BMI=30.20). Higher WHC and FHC were associated with lower BMI, mediated by nutrition and physical activity. The interaction effect between health behavior and work schedule revealed a protective effect on BMI. Overtime shiftwork may share a relationship with BMI. Conclusions Findings may have implications for reexamining organizational policies on maximum weekly overtime in corrections. They provide direction for targeted obesity interventions that encourage a supportive FHC and promote healthy behaviors among supervisors working overtime. PMID:28471768

  20. Plan and schedule for disposition and regulatory compliance for miscellaneous streams. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    On December 23, 1991, the U.S. Department of Energy, Richland Operations Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of Department of Ecology Consent Order No. DE 91NM-177 (Consent Order). The Consent Order lists regulatory milestones for liquid effluent streams at the Hanford Site to comply with the permitting requirements of Washington Administrative Code (WAC) 173-216 (State Waste Discharge Permit Program) or WAC 173-218 (Washington Underground Injection Control Program) where applicable. Hanford Site liquid effluent streams discharging to the soil column have been categorized in the Consent Order as follows: Phase I Streams Phase II Streams Miscellaneous Streams. Phase I and Phase II Streams are addressed in two RL reports: open-quotes Plan and Schedule to Discontinue Disposal of Contaminated Liquids into the Soil Column at the Hanford Siteclose quotes (DOE-RL 1987), and open-quotes Annual Status of the Report of the Plan and Schedule to Discontinue Disposal of Contaminated Liquids into the Soil Column at the Hanford Siteclose quotes. Miscellaneous Streams are those liquid effluent streams discharged to the ground that are not categorized as Phase I or Phase II Streams. Miscellaneous Streams discharging to the soil column at the Hanford Site are subject to the requirements of several milestones identified in the Consent Order. This document provides a plan and schedule for the disposition of Miscellaneous Streams. The disposition process for the Miscellaneous Streams is facilitated using a decision tree format. The decision tree and corresponding analysis for determining appropriate disposition of these streams is presented in this document

  1. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  2. Formerly utilized MED/AEC sites remedial action program. Radiological survey of the Middlesex Sampling Plant, Middlesex, New Jersey. Final report

    International Nuclear Information System (INIS)

    1977-11-01

    The results of a radiological survey of the former Middlesex Sampling Plant, Middlesex, New Jersey, are presented in this report. The surveyed property served as a uranium ore sampling plant during the 1940's and early 1950's. It was released for unrestricted use in 1968 following a radiological survey by the Atomic Energy Commission and is now a reserve training center for the U.S. Marine Sixth Motor Transport Battalion. The present survey was undertaken to determine whether the existing radiological status of the property is consistent with current health guidelines and radiation protection practices. The radiological survey included measurement of residual alpha and beta-gamma contamination levels, radon and radon daughter concentrations in buildings, external gamma radiation levels on the site and on adjacent property, and radium concentrations in soil on the site and on adjacent property. Surface contamination levels exceeded U.S. Nuclear Regulatory Commission (NRC) guidelines and 222 Rn concentration levels exceeded the non-occupational maximum permissible concentration MPC/sub a/ of 3 pCi/liter in some structures. These results indicate the possible need for extensive radon and radon daughter measurements in structures both onsite and offsite over periods as suggested by the U.S. Surgeon General

  3. Results of the post remedial action survey of areas 4 through 10 at the former Kellex site in Jersey City, New Jersey

    International Nuclear Information System (INIS)

    Clark, C.; Berven, B.A.; Cottrell, W.D.; Goldsmith, W.A.

    1982-01-01

    A post remedial action survey was conducted at the former Kellex Corporation Research Facility in Jersey City, New Jersey. The Kellex facility was involved in the Manhattan Project, particularly in the area of engineering research in gaseous diffusion for uranium enrichment. As a result of those operations, this site was included by the US Department of Energy (DOE) in their Formerly Utilized Sites Remedial Action Program (FUSRAP). During comprehensive radiological surveys conducted by Oak Ridge National Laboratory in the summer of 1979, ten areas were located with levels of radionuclides in soil in excess of DOE criteria. This report describes the results of radiological surveys conducted in seven of these locations (Areas 4 to 10) following remedial action. Results of these surveys indicate that remedial action was successful in reducing radioactive contamination in these areas to criteria values established by DOE. 7 references, 19 figures, 31 tables

  4. Technical summary of groundwater quality protection program at the Savannah River Site, 1952--1986. Volume 1, Site geohydrology and waste sites

    Energy Technology Data Exchange (ETDEWEB)

    Heffner, J.D. [ed.] [Exploration Resources, Inc., Athens, GA (United States)

    1991-11-01

    This report provides information regarding the status of and groundwater quality at the waste sites at the Department of Energy`s (DOE) Savannah River Site (SRS). Specific information provided for each waste site at SRS includes its location, size, inventory (when known), and history. Many waste sites at SRS are considered to be of little environmental concern because they contain nontoxic or inert material such as construction rubble and debris. Other waste sites, however, either are known to have had an effect on groundwater quality or are suspected of having the potential to affect groundwater. Monitoring wells have been installed at most of these sites; monitoring wells are scheduled for installation at the remaining sites. Results of the groundwater analyses from these monitoring wells, presented in the appendices, are used in the report to help identify potential contaminants of concern, if any, at each waste site. The list of actions proposed for each waste site in Christensen and Gordon`s 1983 report are summarized, and an update is provided for each site. Planned actions for the future are also outlined.

  5. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  6. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  7. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  8. Radiometric survey in sampling areas of Itataia mine ore and radiometric monitoring in Itataia project sites

    International Nuclear Information System (INIS)

    1982-07-01

    This radiometric survey was done by CDTN, in Itataia sites, on July/82 and it aimed fundamentally to evaluate local radiological conditions, as for aspect of occupational radiation protection. Besides of results obtained, this report has informations of general aspects that ought to serve as subsidies for elaboration of radiological protection program of local. (author) [pt

  9. The Savannah River Site`s Groundwater Monitoring Program, second quarter 1989

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-31

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  10. A slingram survey on the Nevada Test Site: part of an integrated geologic geophysical study of site evaluation for nuclear waste disposal

    Science.gov (United States)

    Flanigan, Vincent J.

    1979-01-01

    A slingram geophysical survey was made in early 1978 as part of the integrated geologlcal-geophysical study aimed at evaluating the Eleana Formation as a possible repository for nuclear waste. The slingram data were taken over an alluvial fan and pediments along the eastern flank of Syncline Ridge about 45 km north of Mercury, Nevada, on the Nevada Test Site. The data show that the more conductive argillaceous Eleana Formation varies in depth from 40 to 85 m from west to east along traverse lines. Northeast-trending linear anomalies suggest rather abrupt changes in subsurface geology that may be associated with faults and fractures. The results of the slingram survey will, when interpreted in the light of other geologic and geophysical evidence, assist in understanding the shallow parts of the geologic setting of the Eleana Formation.

  11. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  12. Radiometric survey in the sites of Regional office in Fortaleza, research gallery and camp in Itataia, CE (Brazil)

    International Nuclear Information System (INIS)

    1982-02-01

    The radiometric survey in Regional officer sites in Fortaleza, Brazil, research gallery and camp in Itataia is presented. The measurings to be done, the instrumentation used and results obtained are described as well as the conclusions and recommendations. (C.M.) [pt

  13. Do scheduled caste and scheduled tribe women legislators mean lower gender-caste gaps in primary schooling in India?

    Science.gov (United States)

    Halim, Nafisa; Yount, Kathryn M; Cunningham, Solveig

    2016-07-01

    Despite India's substantial investments in primary schooling, gaps in schooling persist across gender and caste-with scheduled caste and scheduled tribe (SC/ST) girls being particularly disadvantaged. The representation of SC/ST women in state legislatures may help to mitigate this disadvantage. Specifically, because of her intersecting gender and caste/tribe identities, a SC/ST woman legislator might maintain a strong sense of solidarity especially with SC/ST girls and women, and support legislative policies benefitting SC/ST girls. Consequently, for this reason, we expect that living in a district where SC/ST women represent in state legislatures in a higher proportion may increase SC/ST girls' primary school completion, progression and performance. We tested this hypothesis using district-level data between 2000 and 2004 from the Indian Election Commission, the 2004/5 India Human Development Survey, and the Indian Census of 2001. As expected, the representation of SC/ST women in state legislatures was positively associated with SC/ST girls' grade completion and age-appropriate grade progression but was apparent not SC/ST girls' primary-school performance. SC/ST women's representation in state legislatures may reduce gender-caste gaps in primary-school attainment in India. Copyright © 2016. Published by Elsevier Inc.

  14. Electrical resistivity imaging (ERI) and ground-penetrating radar (GPR) survey at the Giribaile site (upper Guadalquivir valley; southern Spain)

    Science.gov (United States)

    Martínez, J.; Rey, J.; Gutiérrez, L. M.; Novo, A.; Ortiz, A. J.; Alejo, M.; Galdón, J. M.

    2015-12-01

    The Giribaile archaeological site is one of the most important Iberian enclaves of the Alto Guadalquivir (Southern Spain). However, to date, only minimal excavation work has been performed at the site. Evaluation requires a preliminary, non-destructive general analysis to determine high-interest areas. This stage required a geophysical survey. Specifically, a 100 m2 grid was selected, where an initial campaign of nine electrical resistivity imaging (ERI) profiles was performed, where each profile was 111 m in length; these profiles were previously located using a detailed topographical survey. A total of 112 electrodes were used for each profile, spaced at 1 m apart with a Wenner-Schlumberger configuration. Secondly, 201 GPR profiles were created using a 500 MHz antenna. The 100 m long profiles were spaced 0.5 m apart and parallel to one another. The present research analyses the efficiency of each of these geophysical tools in supporting archaeological research. Using these methodologies, the position, morphology, and depth of different buried structures can be determined. 3D interpretation of the geophysical survey in 100 × 100 m grid allowed to differentiate structures square and rectangular, interesting buildings in a semicircle (interpreted as ovens) plus delineate different streets. From the geophysical survey follows the Carthaginian presence inside this ancient Iberian enclave.

  15. What Are Probability Surveys used by the National Aquatic Resource Surveys?

    Science.gov (United States)

    The National Aquatic Resource Surveys (NARS) use probability-survey designs to assess the condition of the nation’s waters. In probability surveys (also known as sample-surveys or statistical surveys), sampling sites are selected randomly.

  16. Results of the radiological survey at the former Alba Craft Laboratory site properties, Oxford, Ohio (OXO001)

    International Nuclear Information System (INIS)

    Murray, M.E.; Brown, K.S.; Mathis, R.A.

    1993-03-01

    At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at the former Alba Craft Laboratory Site Properties, Oxford, Ohio. The survey was performed in July and September of 1992. The purpose of the survey was to determine whether the property was contaminated with radioactive residues, primarily 238 U, from uranium machining operations conducted for National Lead of Ohio, a prime Atomic Energy Commission contractor. The survey included scan measurement of direct radiation levels inside and outside the former laboratory, outdoors on eight properties adjoining the former laboratory, and the city right-of-way adjacent to the surveyed properties. Radionuclide concentrations were determined in outdoor surface and subsurface soil samples taken from each property and the exterior of the laboratory. Fixed surface residual radioactivity was measured inside the laboratory and outside the building. Air samples were collected, direct exposure was measured, and samples were collected to measure transferable radioactivity inside the building. Results of the survey indicate areas where surface and soil contamination level s are above the DOE guidelines for uncontrolled areas

  17. LSST telescope and site status

    Science.gov (United States)

    Gressler, William J.

    2016-07-01

    The Large Synoptic Survey Telescope (LSST) Project1 received its construction authorization from the National Science Foundation in August 2014. The Telescope and Site (T and S) group has made considerable progress towards completion in subsystems required to support the scope of the LSST science mission. The LSST goal is to conduct a wide, fast, deep survey via a 3-mirror wide field of view optical design, a 3.2-Gpixel camera, and an automated data processing system. The summit facility is currently under construction on Cerro Pachón in Chile, with major vendor subsystem deliveries and integration planned over the next several years. This paper summarizes the status of the activities of the T and S group, tasked with design, analysis, and construction of the summit and base facilities and infrastructure necessary to control the survey, capture the light, and calibrate the data. All major telescope work package procurements have been awarded to vendors and are in varying stages of design and fabrication maturity and completion. The unique M1M3 primary/tertiary mirror polishing effort is completed and the mirror now resides in storage waiting future testing. Significant progress has been achieved on all the major telescope subsystems including the summit facility, telescope mount assembly, dome, hexapod and rotator systems, coating plant, base facility, and the calibration telescope. In parallel, in-house efforts including the software needed to control the observatory such as the scheduler and the active optics control, have also seen substantial advancement. The progress and status of these subsystems and future LSST plans during this construction phase are presented.

  18. Methods for computing water-quality loads at sites in the U.S. Geological Survey National Water Quality Network

    Science.gov (United States)

    Lee, Casey J.; Murphy, Jennifer C.; Crawford, Charles G.; Deacon, Jeffrey R.

    2017-10-24

    The U.S. Geological Survey publishes information on concentrations and loads of water-quality constituents at 111 sites across the United States as part of the U.S. Geological Survey National Water Quality Network (NWQN). This report details historical and updated methods for computing water-quality loads at NWQN sites. The primary updates to historical load estimation methods include (1) an adaptation to methods for computing loads to the Gulf of Mexico; (2) the inclusion of loads computed using the Weighted Regressions on Time, Discharge, and Season (WRTDS) method; and (3) the inclusion of loads computed using continuous water-quality data. Loads computed using WRTDS and continuous water-quality data are provided along with those computed using historical methods. Various aspects of method updates are evaluated in this report to help users of water-quality loading data determine which estimation methods best suit their particular application.

  19. Analyzing scheduling in the food-processing industry

    DEFF Research Database (Denmark)

    Akkerman, Renzo; van Donk, Dirk Pieter

    2009-01-01

    Production scheduling has been widely studied in several research areas, resulting in a large number of methods, prescriptions, and approaches. However, the impact on scheduling practice seems relatively low. This is also the case in the food-processing industry, where industry......-specific characteristics induce specific and complex scheduling problems. Based on ideas about decomposition of the scheduling task and the production process, we develop an analysis methodology for scheduling problems in food processing. This combines an analysis of structural (technological) elements of the production...... process with an analysis of the tasks of the scheduler. This helps to understand, describe, and structure scheduling problems in food processing, and forms a basis for improving scheduling and applying methods developed in literature. It also helps in evaluating the organisational structures...

  20. Food surveys for assessing chemical and dosimetric impacts near industrial sites; Enquetes alimentaires pour l'evaluation des impacts chimiques et dosimetriques a proximite de sites nucleaires

    Energy Technology Data Exchange (ETDEWEB)

    Parache, V.; Maurau, S.; Mercat, C.

    2011-03-15

    Estimating the ingestion of potentially contaminated foodstuffs around conventional and nuclear industrial sites requires data about the food practices and eating habits of the local residents, especially the consumption of locally- and home-produced food. The IRSN thus chose to conduct surveys about these practices in the vicinity of nuclear sites. Their methodology was based on previous surveys near nuclear sites. In 2004, in partnership with AREVA and BEGEAT, the French Institute for Radioprotection and Nuclear Safety studied the eating habits of the residents of Bollene, near the Tricastin plant (Rhone Valley), with the aim of improving the quantification of the plant's potential health impacts. Based on these studies and as part of the SENSIB project to characterize vulnerability to nuclear risks, we developed and tested a survey protocol during the summer 2008, around the Chinon nuclear plant, in collaboration with EDF. The protocol is currently being tested around the Marcoule nuclear plant, in collaboration with the CEA. The aim was to optimize the feasibility and the reproducibility of the approach, while losing none of the robustness of the results. The data obtained made it possible to evaluate daily food intake values for individuals and to assess the rates of consumption of locally-grown products for many food categories. The data showed the existence of local population groups with very high rates of locally-grown food consumption - over 90 % of certain food products. This comparative study thus shows the significant variability of eating habits in the French population and proposes a reproducible approach to evaluating realistic indicators of potentially risky dietary habits. (authors)

  1. Global positioning site environment evaluator

    International Nuclear Information System (INIS)

    Leffler, S.; Reeser, H.G.; Zaker, E.; Hansen, W.; Sikorski, R.W.

    1990-01-01

    Development of an innovative, integrated, automated system (Global Positioning Site Environment Evaluator - GPSEETM) for surveying contaminated waste sites is described. This system makes novel use of the Global Positioning System (GPS) satellite constellation for establishing specific locations and current times for surveying radioactive, hazardous, or mixed-waste sites. GPSEE may also be used for waste site contamination surveys after remediation activities to ensure environmental remediation is complete. A base station is established for collecting and recording data and directing field operations for field stations which may be located many miles from the base station. The field operators collect site surveying and contamination data utilizing a variety of chemical and radiological sensors. A major goal for the data collection process is to collect all data utilizing in situ sensors, thereby minimizing the need for collecting soil and water samples. Site contamination data is transmitted electronically to the base station for recording and processing. The GPSEE system is being developed for use at DOE/DOD and a variety of industrial facilities. 3 figs

  2. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  3. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  4. Problems of geologic survey of high level radioactive waste repositories illustrated on the testing site in the Melechov Massif

    International Nuclear Information System (INIS)

    Mlcoch, B.

    1997-01-01

    Major attention is paid to problems associated with the geologic maps of the prospective repository site, which lies within the Bohemian Massif. Structural geology, survey through boreholes, and primary database are also discussed briefly. (P.A.)

  5. Transition and Closeout of the Former DOE Mound Plant Site: Lessons Learned

    International Nuclear Information System (INIS)

    Carpenter, C. P.; Marks, M. L.; Smiley, S.L.; Gallaher, D. M.

    2006-01-01

    The U.S. Department of Energy's (DOE's) Office of Environmental Management (EM) manages the Miamisburg Closure Project (MCP) by cleaning up the Mound site, located in Miamisburg, Ohio, to specific environmental standards, conveying all excess land parcels to the Miamisburg Mound Community Improvement Corporation, and transferring all continuing DOE post-closure responsibilities to the Office of Legacy Management (LM). Presently, the EM cleanup contract of the Mound site with CH2M Hill Mound Inc. is scheduled for completion on March 31, 2006. LM manages the Mound transition efforts and also post-closure responsibilities at other DOE sites via a contract with the S.M. Stoller Corporation. The programmatic transfer from EM to LM is scheduled to take place on October 1, 2006. The transition of the Mound site has required substantial integration and coordination between the EM and LM. Several project management principles have been implemented to help facilitate the transfer of programmatic responsibility. As a result, several lessons learned have been identified to help streamline and improve integration and coordination of the transfer process. Lessons learned from the Mound site transition project are considered a work in progress and have been summarized according to a work breakdown structure for specific functional areas in the transition schedule. The functional areas include program management, environmental, records management, information technology, property management, stakeholder and regulatory relations, procurement, worker pension and benefits, and project closeout. Specific improvements or best practices have been recognized and documented by the Mound transition team. The Mound site is one of three major cleanup sites within the EM organization scheduled for completion in 2006. EM, EM cleanup contractor, LM, and LM post-closure contractor have identified lessons learned during the transition and closure of the Mound site. The transition effort from

  6. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  7. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  8. Aerial multispectral surveys - from the analysis of architectural monuments to the identification of archaeological sites

    Science.gov (United States)

    Mario, Bottoni; Fabretti, Giuseppe; Fabretti, Maurizio

    2010-05-01

    Combined non destructive and extensive multispectral analysis (thermography, photographic infrared and air photogrammetry) can be used, as aerial surveys, to verify and integrate hypotheses based upon investigations conducted on the spot and in the archives, about the location of archaeological sites in a certain area. These techniques using specified sensors (photographic emulsions, semi conductors) enable one to record and visualize different optical phenomena, related to the wavelength of the radiations and to the thermal exchange between structures lying underground and the soil. The information obtained has an extensive characteristic that can be transferred on maps. The results are in practice continuous in the spatial dimension in a non destructive way, leaving the site perfectly undisturbed. Relating to this first survey, it may be possible to locate the most significant areas and to proceed with more punctual multispectral surveys and local excavations. The next step is to compare these results and to extend them to wider areas, establishing the significance of irregularities found with the aerial surveys and creating conclusive thematic maps. These maps will give useful indications to define the archaeological excavation or the course of highways, water mains and other structures on the terrain. This work presents the application of the method to the archaeological site of Fondo Marco Terenzio Varrone Cassino (Frosinone) under the control of the Archaeological Soprintendency of Lazio. The survey made it possible to determine the course of the water main of the town of Cassino through the archaeological area in a few months and with great reliability. Actually use of aerial thermovision demonstrated itself very useful since nineties in the analysis of the microclimatic behaviour of architectonic structures of significant dimensions, such as the dome of Santa Maria del Fiore in Florence. In this situation a mathematical model had been developed aimed to

  9. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  10. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  11. Aerial radiological survey of Areas 18 and 20 Nevada Test Site. Date of survey: October-November 1980

    International Nuclear Information System (INIS)

    Feimster, E.L.

    1985-11-01

    Radiological surveys were conducted over Areas 18 and 20 at the Nevada Test Site (NTS) during the period 10 October through 13 November 1980. Separate surveys of the two areas were conducted simultaneously using arrays of NaI(Tl) scintillation crystals mounted on Messerschmitt-Bolkow-Blohm BO-105 and Hughes H-500 helicopters. Exposure rate contour maps due to total terrestrial gamma ray activity were produced for both areas. The most frequently occurring range of exposure rates was 17 to 25 μR/h for both Areas 18 and 20; the total range varied from 12 to 2000 μR/h. These values include an estimated cosmic contribution of 6 μR/h. An isocount rate contour map showing the distribution of count rates measured in the spectral window sensitive to cesium-137 was produced to show the extent of man-made contaminants in Area 18. In a similar manner, an isocount rate contour map showing the distribution of count rates measured in a spectral window sensitive to cobalt-60 was used to show the extent of man-made contaminants in Area 20. The extent of man-made contamination from the effluents of the various events in both areas shows patterns indicative of the prevailing winds during and after the events. Except for the presence of low levels of cesium-137 activity in the eastern half of Area 18, all contaminants can be correlated with the effluents of the various events. In Area 18, cesium-137 activity appears to be spread over about 30 to 40 percent of the eastern half; it does not appear to be directly associated with the events in this area. The distribution and level of background radiation in the two areas are consistent with those measured during previous surveys

  12. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  13. The Savannah River Site`s Groundwater Monitoring Program, third quarter 1989

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-31

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During third quarter 1989 (July--September), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the third quarter is presented in the Flagging Criteria section of this document. All analytical results from third quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

  14. A charcoal canister survey of radon emanation at the rehabilitated uranium mine site at Nabarlek

    International Nuclear Information System (INIS)

    Storm, J.R.; Patterson, J.R.

    1999-01-01

    This paper describes a recent survey of radon emanation measurements from the rehabilitated Nabarlek mine site. It was mined out in 1979, decommissioned in 1995 and provided a good test bed for assessment of rehabilitation in terms of radon flux attenuation. Measurements have been made with charcoal canisters. Studies to measure the radon-220 flux by observing Tl-208 progeny of thoron the effectiveness of trial covers and meteorological considerations will be reported

  15. A charcoal canister survey of radon emanation at the rehabilitated uranium mine site at Nabarlek

    Energy Technology Data Exchange (ETDEWEB)

    Storm, J R; Patterson, J R [University of Adelaide, Adelaide, SA (Australia). Department of Physics and Mathematical Physics

    1999-07-01

    This paper describes a recent survey of radon emanation measurements from the rehabilitated Nabarlek mine site. It was mined out in 1979, decommissioned in 1995 and provided a good test bed for assessment of rehabilitation in terms of radon flux attenuation. Measurements have been made with charcoal canisters. Studies to measure the radon-220 flux by observing Tl-208 progeny of thoron the effectiveness of trial covers and meteorological considerations will be reported.

  16. Savannah River Site's Site Specific Plan

    International Nuclear Information System (INIS)

    1991-01-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering

  17. 77 FR 71447 - Notice of Fee Schedule for Reviewing Historic Preservation Certification Applications and...

    Science.gov (United States)

    2012-11-30

    ... applications for Federal tax incentives contained in Section 47 of the Internal Revenue Code (referred to... through the NPS's Web site at http://www.nps.gov/tps/tax-incentives.htm . The new fee schedule applies... preservation tax certification, and such funds shall be available until expended without further appropriation...

  18. DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 2

    International Nuclear Information System (INIS)

    Gerber, E.W.

    1995-10-01

    The Hanford Site Integrated Stabilization Management Plan (SISMP) was developed in support of the US Department of Energy's (DOE) Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Integrated Program Plan (IPP). Volume 1 of the SISMP identifies the technical scope and costs associated with Hanford Site plans to resolve concerns identified in DNFSB Recommendation 94-1. Volume 2 of the SISMP provides the Resource Loaded Integrated Schedules for Spent Nuclear Fuel Project and Plutonium Finishing Plant activities identified in Volume 1 of the SISMP. Appendix A provides the schedules and progress curves related to spent nuclear fuel management. Appendix B provides the schedules and progress curves related to plutonium-bearing material management. Appendix C provides programmatic logic diagrams that were referenced in Volume 1 of the SISMP

  19. Aerial radiation surveys

    International Nuclear Information System (INIS)

    Jobst, J.

    1980-01-01

    A recent aerial radiation survey of the surroundings of the Vitro mill in Salt Lake City shows that uranium mill tailings have been removed to many locations outside their original boundary. To date, 52 remote sites have been discovered within a 100 square kilometer aerial survey perimeter surrounding the mill; 9 of these were discovered with the recent aerial survey map. Five additional sites, also discovered by aerial survey, contained uranium ore, milling equipment, or radioactive slag. Because of the success of this survey, plans are being made to extend the aerial survey program to other parts of the Salt Lake valley where diversions of Vitro tailings are also known to exist

  20. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    International Nuclear Information System (INIS)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs

  1. The development of KMRR schedule and progress control system (KSPCS) for the master schedule of KMRR project

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Chang Woong; Lee, Tae Joon; Kim, Joon Yun; Cho, Yun Ho; Hah, Jong Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-07-01

    This report was to development the computerized schedule and progress control system for the master schedule of KMRR project with ARTEMIS 7000/386 CM (Ver. 7.4.2.) based on project management theory (PERT/CPM, PDM, and S-curve). This system has been efficiently used for KMRR master schedule and will be utilized for the detail scheduling of KMRR project. (Author) 23 refs., 26 figs., 52 tabs.

  2. Scheduling the Stork: Media Portrayals of Women's and Physicians' Reasons for Elective Cesarean Delivery.

    Science.gov (United States)

    Campo-Engelstein, Lisa; Howland, Lauren E; Parker, Wendy M; Burcher, Paul

    2015-06-01

    Media interest in cesarean delivery has grown in recent years driven both by rising cesarean delivery rates and the decision by the American College of Obstetrics and Gynecology (ACOG) to permit elective cesarean (EC) delivery. A content analysis of United States newspaper and magazine articles from 2000 to 2013 (n = 131 articles) was completed to understand how the news media portrays ECs. The majority of articles (71.8%) emphasized reasons to support women having an EC, while 38.2 percent of the articles exhibited themes of physician support for ECs. Relatively few articles mentioned reasons against ECs either from the women's perspective (11.5%) or the practitioners' (3.8%). The most common themes given for women choosing ECs were convenience/scheduling (48.9%), avoidance of pain or fear of labor (29.8%), and physical harm to women from vaginal birth (17.6%). Doctors' perspectives were less prevalent in the media than women's perspectives, but when mentioned they were almost exclusively in support of ECs for reasons including avoiding malpractice (28.2%), avoiding physical harm to the woman or baby (16.8%), and timing/scheduling (14.5%). Media coverage suggests ECs are widely accepted by both women and doctors, with women choosing an EC mainly for convenience/scheduling and fear. However, 43 percent of doctors surveyed by ACOG said they were not willing to perform the procedure, and surveys report that mothers rarely request an EC. © 2015 Wiley Periodicals, Inc.

  3. An exploratory survey of male and female learner opinions on ...

    African Journals Online (AJOL)

    An exploratory survey was undertaken to determine whether secondary school learners have certain preferences regarding the biology they study at school and whether learners from co-educational and single-sex schools hold the same opinions. A survey schedule comprising two components was developed. The first ...

  4. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ..., methamphetamine, and MDMA, Schedule I and II substances. These effects included elevated body temperature... of reuptake of monoamines, and in vivo studies (microdialysis, locomotor activity, body temperature.... Yet another commenter claimed that Schedule I placement would ``cripple efforts at learning,'' make it...

  5. Fish stock surveys from 41 sites on the islands of Oahu and Hawaii from September 11, 1952 to December 28, 2000 (NODC Accession 0002754)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Data are from underwater visual surveys of fish stocks from 41 survey sites on the islands of Oahu and Hawaii, conducted by biologists and technicians of Hawaii's...

  6. Hanford Site Waste Management Plan

    International Nuclear Information System (INIS)

    1988-12-01

    The Hanford Site Waste Management Plan (HWMP) was prepared in accordance with the outline and format described in the US Department of Energy Orders. The HWMP presents the actions, schedules, and projected costs associated with the management and disposal of Hanford defense wastes, both radioactive and hazardous. The HWMP addresses the Waste Management Program. It does not include the Environmental Restoration Program, itself divided into the Environmental Restoration Remedial Action Program and the Decontamination and Decommissioning Program. The executive summary provides the basis for the plans, schedules, and costs within the scope of the Waste Management Program at Hanford. It summarizes fiscal year (FY) 1988 including the principal issues and the degree to which planned activities were accomplished. It further provides a forecast of FY 1989 including significant milestones. Section 1 provides general information for the Hanford Site including the organization and administration associated with the Waste Management Program and a description of the Site focusing on waste management operations. Section 2 and Section 3 describe radioactive and mixed waste management operations and hazardous waste management, respectively. Each section includes descriptions of the waste management systems and facilities, the characteristics of the wastes managed, and a discussion of the future direction of operations

  7. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  8. Mixed waste focus area integrated master schedule (current as of May 6, 1996)

    International Nuclear Information System (INIS)

    1996-01-01

    The mission of the Mixed Waste Characterization, Treatment, and Disposal Focus Area (MWFA) is to provide acceptable treatment systems, developed in partnership with users and with the participation of stakeholders, tribal governments, and regulators, that are capable of treating the Department of Energy's (DOE's) mixed wastes. In support of this mission, the MWTA produced the Mixed Waste Focus Area Integrated Technical Baseline Report, Phase I Volume 1, January 16, 1996, which identified a prioritized list of 30 national mixed waste technology deficiencies. The MWFA is targeting funding toward technology development projects that address the current list of deficiencies. A clear connection between the technology development projects and the EM-30 and EM-40 treatment systems that they support is essential for optimizing the MWFA efforts. The purpose of the Integrated Master Schedule (IMS) is to establish and document these connections and to ensure that all technology development activities performed by the MWFA are developed for timely use in those treatment systems. The IMS is a list of treatment systems from the Site Treatment Plans (STPs)/Consent Orders that have been assigned technology development needs with associated time-driven schedules, Technology deficiencies and associated technology development (TD) needs have been identified for each treatment system based on the physical, chemical, and radiological characteristics of the waste targeted for the treatment system. The schedule, the technology development activities, and the treatment system have been verified through the operations contact from the EM-30 organization at the site

  9. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  10. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  11. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  12. Optimizing the Steel Plate Storage Yard Crane Scheduling Problem Using a Two Stage Planning/Scheduling Approach

    DEFF Research Database (Denmark)

    Hansen, Anders Dohn; Clausen, Jens

    This paper presents the Steel Plate Storage Yard Crane Scheduling Problem. The task is to generate a schedule for two gantry cranes sharing tracks. The schedule must comply with a number of constraints and at the same time be cost efficient. We propose some ideas for a two stage planning...

  13. Analysis of the GPS Observations of the Site Survey at Sheshan 25-m Radio Telescope in August 2008

    Science.gov (United States)

    Liu, L.; Cheng, Z. Y.; Li, J. L.

    2010-01-01

    The processing of the GPS observations of the site survey at Sheshan 25-m radio telescope in August 2008 is reported. Because each session in this survey is only about six hours, not allowing the subdaily high frequency variations in the station coordinates to be reasonably smoothed, and because there are serious cycle slips in the observations and a large volume of data would be rejected during the software automatic adjustment of slips, the ordinary solution settings of GAMIT needed to be adjusted by loosening the constraints in the a priori coordinates to 10 m, adopting the "quick" mode in the solution iteration, and combining Cview manual operation with GAMIT automatic fixing of cycle slips. The resulting coordinates of the local control polygon in ITRF2005 are then compared with conventional geodetic results. Due to large rotations and translations in the two sets of coordinates (geocentric versus quasi-topocentric), the seven transformation parameters cannot be solved for directly. With various trial solutions it is shown that with a partial pre-removal of the large parameters, high precision transformation parameters can be obtained with post-fit residuals at the millimeter level. This analysis is necessary to prepare the follow-on site and transformation survey of the VLBI and SLR telescopes at Sheshan

  14. Savannah River Site mixed waste Proposed Site Treatment Plan (PSTP). Volumes 1 and 2 and reference document: Revision 2

    International Nuclear Information System (INIS)

    Helmich, E.; Noller, D.K.; Wierzbicki, K.S.; Bailey, L.L.

    1995-01-01

    The DOE is required by the Resource Conservation and Recovery Act to prepare site treatment plans describing the development of treatment capacities and technologies for treating mixed waste. This proposed plan contains Savannah River Site's preferred options and schedules for constructing new facilities, and otherwise obtaining treatment for mixed wastes. The proposed plan consists of 2 volumes. Volume 1, Compliance Plan, identifies the capacity to be developed and the schedules as required. Volume 2, Background, provides a detailed discussion of the preferred options with technical basis, plus a description of the specific waste streams. Chapters are: Introduction; Methodology; Mixed low level waste streams; Mixed transuranic waste; High level waste; Future generation of mixed waste streams; Storage; Process for evaluation of disposal issues in support of the site treatment plans discussions; Treatment facilities and treatment technologies; Offsite waste streams for which SRS treatment is the Preferred Option (Naval reactor wastes); Summary information; and Acronyms and glossary. This revision does not contain the complete revised report, but only those pages that have been revised

  15. F/H Area high level waste removal plan ampersand schedule as required by the Federal Facility Agreement for the Savannah River Site

    International Nuclear Information System (INIS)

    Hunter, M.A.

    1993-11-01

    The F and H-area HLW Tank Farms are one component of a larger integrated waste treatment system consisting of facilities designed for the overall processing of several radioactive waste streams resulting from nuclear material processing. Section IX.E of the SRS Federal Facility Agreement requires the DOE to submit to the EPA and SCDHEC for review and approval, a plan(s) and schedule(s) for the removal from service of waste tank systems(s)/component(s) that do not meet secondary containment standards, or that leak or have leaked. The Plan and Schedule for removal from service of these waste tanks is shown in Appendices A and B, respectively. Other portions of this package which include schedule dates are provided for information only. The SRS intends to remove systems from service as opposed to providing secondary containment for non-compliant systems. The systems that do not meet secondary containment requirements or that have leaked (as determined by tank assessment reports) include High Level Waste Tanks No. 1--24 along with corresponding ancillary equipment

  16. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  17. APPLICABILITY ANALYSIS OF ULTRA-LIGHT UAV FOR FLOODING SITE SURVEY IN SOUTH KOREA

    Directory of Open Access Journals (Sweden)

    I. Lee

    2013-05-01

    Full Text Available Recently, UAV (Unmanned Aerial Vehicle is used in a variety of fields such as the military service, fire prevention, traffic supervision, mapping, and etc. The increased demand for UAVs is typically attributed to the low manufacturing and operational costs, flexibility of the platforms to accommodate the consumer’s particular needs and the elimination of the risk to pilots’ lives in difficult missions. But, in South Korea, UAV might be first introduced to military service, and is still in its infancy, just being available for construction site monitoring, landscape photographing, spraying agricultural chemicals, broadcasting fields. This study presents the background and the aim of flood mapping, and presents the possibility analysis of how to use UAV effectively for flooding area. And author tries to overlap UAV image with the flooding area trace surveyed by ground surveys. As a result, it is expected that UAV photogrammetry will contributes to investigating the flooded area by providing images, which is describing the flooded area in near real-time and also making a decision like paying compensation.

  18. Use of a commercial ranging system in field surveys of radioactively contaminated sites

    International Nuclear Information System (INIS)

    Worth, G.M.; Crowell, J.M.; Meddles, A.D.; Jarrett, J.D.; Wolf, M.A.; Umbarger, C.J.; Moyer, C.

    1984-01-01

    Now, the adaptation of a commercial ranging and tracking system interfaced to these instruments and to an advanced computer graphics system promises another major improvement to the automation of data collection. Contour maps with radiation isopleths and the x-y position of up to eight instrument operators superimposed thereon can be displayed in near real time. A bidirectional data link offers a further improvement in simulation of, and training for, field surveys since previously collected or computer simulated radiation data as a function of position can be transmitted back to the same survey instrument and displayed to the operator in a manner indistinguishable from real-time data. Additionally, simulated instrument malfunctions such as low battery, detector failure, or total failure can be commanded to occur to evaluate operator response to unusual occurrences under the stress of field conditions. This training mode will greatly improve the ability to simulate situations and to train and evaluate operations personnel while eliminating the need to use special sites and potentially hazardous contamination simulants as are used now

  19. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  20. Applying dynamic priority scheduling scheme to static systems of pinwheel task model in power-aware scheduling.

    Science.gov (United States)

    Seol, Ye-In; Kim, Young-Kuk

    2014-01-01

    Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10-80% over the existing algorithms.

  1. Using a Density-Management Diagram to Develop Thinning Schedules for Loblolly Pine Plantations

    Science.gov (United States)

    Thomas J. Dean; V. Clark Baldwin

    1993-01-01

    A method for developing thinning schedules using a density-management diagram is presented. A density-management diagram is a form of stocking chart based on patterns of natural stand development. The diagram allows rotation diameter and the upper and lower limits of growing stock to be easily transformed into before and after thinning densities. Site height lines on...

  2. Ecological survey for the siting of the Mixed and Low-Level Waste Disposal Facility

    International Nuclear Information System (INIS)

    Hoskinson, R.L.

    1994-05-01

    This report summarizes the results of field ecological surveys conducted by the Center for Integrated Environmental Technologies (CIET) on the Idaho National Engineering Lab. (INEL) at two candidate locations for the siting of the Mixed and Low-Level Waste Disposal Facility (MLLWDF). The purpose of these surveys was to comply with all Federal laws and Executive Orders to identify and evaluate any potential environmental impacts because of the project. The boundaries of the candidate locations were marked with blaze-orange lath survey marker stakes by the project management. Global Positioning in System (GPS) measurements of the marker stakes were made, and input to the Arc/Info geographic information system (GIS). Field surveys were conducted to assess any potential impact to any important species, important habitats, and to any environmental study areas. The GIS location data were overlayed onto the INEL vegetation map and an analysis of vegetation classes on the locations was done. Two species of rare vascular plants have previously been reported to occur in the vicinity of the candidate locations. Two C2 species, the ferruginous hawk (Buteo regalis) and the loggerhead shrike (Lanius ludovicianus) would also be expected to frequent the candidate locations. No significant ecological impact is anticipated if the MLLWDF were constructed on either candidate location. However, both candidate locations are in the central area of the INEL where there is minimal disturbance to the ecosystem by facilities or humans

  3. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  4. Development of an improved installation procedure and schedule of RVI modularization for APR1400

    International Nuclear Information System (INIS)

    Ko, Do Young

    2011-01-01

    The construction technology for reactor vessel internals (RVI) modularization is one of the most important factors to be considered in reducing the construction period of nuclear power plants. For RVI modularization, gaps between the reactor vessel (RV) core-stabilizing lug and the core support barrel (CSB) snubber lug must be measured using a remote method from outside the RV. In order to measure RVI gaps remotely at nuclear power plant construction sites, certain core technologies must be developed and verified. These include a remote measurement system to measure the gaps between the RV core-stabilizing lug and the CSB snubber lug, an RVI mockup to perform the gap measurement tests, and a new procedure and schedule for RVI installation. A remote measurement system was developed previously, and a gap measurement test was completed successfully using the RVI mockup. We also developed a new procedure and schedule for RVI installation. This paper presents the new and improved installation procedure and schedule for RVI modularization. These are expected to become core technologies that will allow us to shorten the construction period by a minimum of two months compared to the existing installation procedure and schedule

  5. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  6. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  7. Reliability and validity of the Children's Fear Survey Schedule-Dental Subscale for Arabic-speaking children: a cross-sectional study.

    Science.gov (United States)

    El-Housseiny, Azza A; Alsadat, Farah A; Alamoudi, Najlaa M; El Derwi, Douaa A; Farsi, Najat M; Attar, Moaz H; Andijani, Basil M

    2016-04-14

    Early recognition of dental fear is essential for the effective delivery of dental care. This study aimed to test the reliability and validity of the Arabic version of the Children's Fear Survey Schedule-Dental Subscale (CFSS-DS). A school-based sample of 1546 children was randomly recruited. The Arabic version of the CFSS-DS was completed by children during class time. The scale was tested for internal consistency and test-retest reliability. To test criterion validity, children's behavior was assessed using the Frankl scale during dental examination, and results were compared with children's CFSS-DS scores. To test the scale's construct validity, scores on "fear of going to the dentist soon" were correlated with CFSS-DS scores. Factor analysis was also used. The Arabic version of the CFSS-DS showed high reliability regarding both test-retest reliability (intraclass correlation = 0.83, p children with negative behavior had significantly higher fear scores (t = 13.67, p fear of invasive dental procedures," "fear of less invasive dental procedures" and "fear of strangers." The Arabic version of the CFSS-DS is a reliable and valid measure of dental fear in Arabic-speaking children. Pediatric dentists and researchers may use this validated version of the CFSS-DS to measure dental fear in Arabic-speaking children.

  8. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  9. The former Semipalatinsk Test Site survey by field γ-spectrometry method

    International Nuclear Information System (INIS)

    Pakhomov, S.A.; Dubasov, Yu.V.; Biryukov, E.I.; Gavrilin, S.S.; Ilyin, L.I.

    2001-01-01

    Full text: Field γ-spectrometry method is the most productive method of getting an information on gamma-irradiating radionuclides contents in objects under survey. For many years the Radium Institute was the most active participant of works on radiation survey of the Semipalatinsk Test Site, field γ-spectrometry method including. In field γ-spectrometry method realization the existence of corresponding apparatus, and methodic software is supposed to be allowing to carry out both measurement, recording of γ-spectrometry energetic characteristics in field conditions and final treatment (using corresponding physical models) ensuring obtaining the information on radionuclides' contents. Different variants of such apparatus were developed and made at the Radium Institute. Under conditions of complex spectral structure and high intensity existence a portable variant of Ge(Li)-detector spectrometer fed by alkaline accumulators and allowing to record a spectrum at high load was elaborated. For walk γ-survey in common with the University two variants of portable spectrometers 'Skif-3' were elaborated: one of them with a standard scintillation detector on the base of Nal(Ti) crystal, having the size of 63x63 mm, and the other is an 'X-ray' detector of large dimension on the base of CsI crystal with a diameter of 165 mm, designated for soft gamma-irradiation registration, 241 Am including. During 8 hours of independent works 'Skif-3' is able to record into internal memory up to 100 spectra with an exposure up to 9999 s. At 10 min exposure in its sensitivity of 241 Am finding (10 Bq/kg) a spectrometer 'Skif-3' excels a portable spectrometer 'InSpector' (Canberra) working with the exposure of 1 hour. For automobile measurements a car spectrometer was elaborated fed. from car board supply and having four detectors based on NaI crystals with the dimensions 200x110 mm and total volume of about 121. For express treatment of a 'Skif-3' spectrometer scintillation spectra special

  10. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  11. Technology for planning and scheduling under complex constraints

    Science.gov (United States)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  12. A survey of beetles (Coleoptera from the tundra surrounding the Nunalleq archaeological site, Quinhagak, southwestern Alaska

    Directory of Open Access Journals (Sweden)

    Véronique Forbes

    2018-03-01

    Full Text Available This paper presents the results of a survey of beetles conducted in the vicinity of the archaeological site of Nunalleq, a pre-contact (16th-17th century AD indigenous forager settlement located near the modern Yup’ik village of Quinhagak, in the Yukon-Kuskokwim delta, southwestern Alaska. Records and habitat data are reported for 74 beetle taxa collected in tundra, riparian, aquatic and anthropogenic environments from a region of Alaska that has been poorly studied by entomologists. This includes the first mainland Alaskan record for the byrrhid Simplocaria metallica (Sturm. Beyond improving our knowledge of the local beetle fauna’s diversity and ecology, this survey provides the basis for comparisons between modern and sub-fossil beetle assemblages from Nunalleq and Quinhagak.

  13. A review on application of neural networks and fuzzy logic to solve hydrothermal scheduling problem

    International Nuclear Information System (INIS)

    Haroon, S.; Malik, T.N.; Zafar, S.

    2014-01-01

    Electrical power system is highly complicated having hydro and thermal mix with large number of machines. To reduce power production cost, hydro and thermal resources are mixed. Hydrothermal scheduling is the optimal coordination of hydro and thermal plants to meet the system load demand at minimum possible operational cost while satisfying the system constraints. Hydrothermal scheduling is dynamic, large scale, non-linear and non-convex optimization problem. The classical techniques have failed in solving such problem. Artificial Intelligence Tools based techniques are used now a day to solve this complex optimization problem because of their no requirements on the nature of the problem. The aim of this research paper is to provide a comprehensive survey of literature related to both Artificial Neural Network (ANN) and Fuzzy Logic (FL) as effective optimization algorithms for the hydrothermal scheduling problem. The outcomes along with the merits and demerits of individual techniques are also discussed. (author)

  14. Results of the radiological survey at the Jessop Steel Company Site, 500 Green Street, Washington, Pennsylvania (JSP001)

    International Nuclear Information System (INIS)

    Cottrell, W.D.; Foley, R.D.; Floyd, L.M.

    1991-04-01

    At the request of the US Department of Energy (DOE), a group from Oak Ridge National Laboratory conducted investigative radiological surveys at the Jessop Steel company, 500 Green Street, Washington, Pennsylvania (JSP001) in 1989. The purpose of the surveys was to determine whether the property was contaminated with radioactive residues, principally 238 U, as a result of work contracted to the Atomic Energy Commission. The survey included gamma scans; direct and transferable measurements of alpha and beta-gamma radiation levels; and soil dust, debris, grinding wheel, and air sampling for radionuclide analyses. The survey and sampling covered portions of the exterior ground surface, the roof and gutter section above the saw shop and rolling mill area of building D, and the interiors of buildings A, B, C and D. Results of the survey demonstrated no radionuclide concentrations in excess of the DOE Formerly Utilized Sites Remedial Action Program guidelines for radium, thorium, and uranium. The radionuclide distributions were not significantly different from typical background levels in the Pennsylvania are. 7 refs., 11 figs., 4 tabs

  15. Key Findings of AAP Store Survey

    Science.gov (United States)

    Melendes, Bob; And Others

    1977-01-01

    Results of the Association of American Publishers "College Bookstore Marketing Survey" in the fall of 1976 are summarized. The intent was to improve college textbook publisher services to college stores in the areas of order fulfillment, publication scheduling, print quantities, shipping, billing, and processing of returns. (LBH)

  16. Ocean Disposal Site Monitoring

    Science.gov (United States)

    EPA is responsible for managing all designated ocean disposal sites. Surveys are conducted to identify appropriate locations for ocean disposal sites and to monitor the impacts of regulated dumping at the disposal sites.

  17. Electromagnetic survey of the K1070A burial ground at the Oak Ridge K-25 Site, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Nyquist, J.E.; Emery, M.S.

    1993-01-01

    The K1070A burial ground, located at the K-25 Site on the Oak Ridge Reservation, received chemical and radioactive wastes from the late 1940s until 1975. Analysis of water samples collected from nearby monitoring wells indicates that contamination is migrating offsite. In November 1991, Oak Ridge National Laboratory (ORNL) personnel collected high-resolution electrical terrain conductivity data at the K1070A burial ground. A Model EM31 terrain conductivity meter manufactured by Geonics Limited was used in conjunction with the ORNL-developed Ultrasonic Ranging and Data System (USRADS) to perform the survey. The purposeof the survey was to provide Environmental Restoration (ER) staff with a detailed map of the spatial variation of the apparent electrical conductivity of the shallow subsurface (upper 3 m) to assist them in siting future monitoring wells closer to the waste area without drilling into the buried waste

  18. An aerial radiological survey of the Savannah River Site and surrounding area, Aiken, South Carolina, October--November 1991

    International Nuclear Information System (INIS)

    Vojtech, R.J.

    1993-12-01

    An aerial radiological survey was conducted during the period of October 14 to November 23, 1991, over an area surrounding the United States Department of Energy's Savannah River Site (SRS). The area is situated 15 kilometers south of Aiken, South Carolina. The purpose of the survey was to measure and document the gamma ray environment of the SRS and surrounding areas. Contour maps showing gamma radiation exposure rates at 1 meter above ground level were constructed from the aerial data and overlaid on a United States Geological Survey map of the area. The exposure rates measured within the survey region are generally uniform and typical of natural background. The reported exposure rate values include an estimated cosmic ray contribution. Enhanced exposure rates not attributable to natural background were measured over several areas within the survey region. The manmade radionuclides detected in these areas, cesium-137, cobalt-60, and protactinium-234m, were produced by the reactor operations and material processing conducted at the SRS. The radiation levels produced by these nuclides are consistent with those levels measured during previous SRS aerial surveys. Radionuclide assays of soil samples and pressurized ion chamber measurements were obtained at four locations within the survey boundaries

  19. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  20. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  1. Gender Still Matters: Effects of Workplace Discrimination on Employment Schedules of Young Professionals

    Directory of Open Access Journals (Sweden)

    Gabriele Plickert

    2017-11-01

    Full Text Available The influx of women into the legal profession has significantly changed the landscape of legal practice. Women lawyers today no longer face the challenges to entering the legal profession they encountered thirty years ago. However, despite these advancements, research continues to demonstrate that there are still gender-based issues women have to face in the legal workplace. Among these issues to date are the difficulties in combining responsibilities of work with responsibilities of families and children that underpin women’s employment and earning disadvantages. Using survey data from a national representative U.S. panel study of lawyers, we examine how work schedules, comparing full-time to part-time work, vary by personal disposition and workplace characteristics. Drawing from prominent explanations of gender inequality in the legal profession, we focus on inquiries of commitment to work, performance, ideal worker expectations, practice settings, and job satisfaction among dimensions of workplace characteristics and examine their effects on women and men lawyers’ work schedules. Logistic regression results show that work schedules significantly vary by gender, parental role, and experience of workplace discrimination. We find that, although all parents experience types of discrimination, there are still major differences in work schedules between mothers and fathers. Our study adds to the gender debate of employment and organizations by examining quantitatively experiences of workplace discrimination.

  2. Environmental Regulatory Compliance Plan for site: Draft characterization of the Yucca Mountain site:Draft

    International Nuclear Information System (INIS)

    1988-01-01

    The objective of the EMMP is to document compliance with the NWPA. To do so, a summary description of site characterization activites is provided, based on the consultation draft of the SCP. Subsequent chpaters identify those technical areas having the potential to be impacted by site characterization activities and the monitoring plans proposed to identify whether those impacts acutally occur. Should monitoring confirm the potential for significant adverse impact, mitigative measures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicle, any significant adverse environmental impacts. Although site characterization activies involve both surface and subsurface activities, it is the surface-based aspect of site characterization that is addressed in detailed by the EMMP. The schedule and duration of these activities is given in the consultation draft of the SCP. A breif summary of all proposed activities is given in the EMMP. 10 refs., 8 figs

  3. Data analysis with the DIANA meta-scheduling approach

    International Nuclear Information System (INIS)

    Anjum, A; McClatchey, R; Willers, I

    2008-01-01

    The concepts, design and evaluation of the Data Intensive and Network Aware (DIANA) meta-scheduling approach for solving the challenges of data analysis being faced by CERN experiments are discussed in this paper. Our results suggest that data analysis can be made robust by employing fault tolerant and decentralized meta-scheduling algorithms supported in our DIANA meta-scheduler. The DIANA meta-scheduler supports data intensive bulk scheduling, is network aware and follows a policy centric meta-scheduling. In this paper, we demonstrate that a decentralized and dynamic meta-scheduling approach is an effective strategy to cope with increasing numbers of users, jobs and datasets. We present 'quality of service' related statistics for physics analysis through the application of a policy centric fair-share scheduling model. The DIANA meta-schedulers create a peer-to-peer hierarchy of schedulers to accomplish resource management that changes with evolving loads and is dynamic and adapts to the volatile nature of the resources

  4. Specialized sorting and measuring system for site remediation

    International Nuclear Information System (INIS)

    Runge, H.; Christ, G.

    2001-01-01

    The machine design and measurement philosophy of the SSGE, developed for excavation and treatment of some 21,000 metric tons of ground material and concrete from NUKEM decommissioned fuel element factory, have already been passed the official licensing procedure. The start up of site clean-up is scheduled for summer 2001. With the SSGE there has been made available a method to safe and economically remediate contaminated ground of nuclear sites. The SSEG, being a mobile system, can be applied at various sites

  5. The Savannah River Site`s Groundwater Monitoring Program: Fourth quarter 1991

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1992-06-02

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During fourth quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from fourth quarter 1991 are listed in this report.

  6. The Savannah River Site`s Groundwater Monitoring Program, second quarter 1990

    Energy Technology Data Exchange (ETDEWEB)

    1991-02-07

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1990 (April through June) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1990 are listed in this report.

  7. The Savannah River Site`s Groundwater Monitoring Program: Second quarter 1992

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1992-10-07

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1992, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Since 1991, the flagging criteria have been based on the federal Environmental Protection Agency (EPA) drinking water standards and on method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1992 are listed in this report.

  8. The Savannah River Site`s Groundwater Monitoring Program. Second quarter, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-10

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1991 EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1991 are listed in this report.

  9. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  10. Paraho oil shale module. Site development plan, Task 4

    Energy Technology Data Exchange (ETDEWEB)

    1981-10-01

    A management plan and schedule which covers all requirements for gaining access to the site and for conducting a Paraho Process demonstration program have been prepared. The oil shale available should represent a regional resource of suitable size and quality for commercial development. Discussed in this report are: proof of ownership; requirements for rights-of-way for access to the site; local zoning restrictions; water rights; site availability verification; and other legal requirements. (DMC)

  11. Environmental assessments required to support nomination of sites

    International Nuclear Information System (INIS)

    Mussler, R.M.

    1984-01-01

    The Nuclear Waste Policy Act of 1982 establishes a schedule for siting the nation's first repository for nuclear waste and spent fuel. The Act assigns the primary responsibility for conducting this siting program to the Department ofEnergy. The provisions of the Act are reviewed, including six legal requirements that must be considered for each environmental assessment, each of which is discussed in detail

  12. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  13. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  14. Prophylactic treatment with a potent corticosteroid cream ameliorates radiodermatitis, independent of radiation schedule

    DEFF Research Database (Denmark)

    Ulff, Eva; Maroti, Marianne; Serup, Jörgen

    2017-01-01

    BACKGROUND AND PURPOSE: The study will test the hypothesis that preventive topical steroid treatment instituted from start of radiotherapy can ameliorate acute radiation dermatitis. Subgroups of increased risk of dermatitis are included. MATERIAL AND METHODS: A double blinded randomized trial...... of acute radiation dermatitis in breast cancer patients treated with adjuvant RT, independent of RT schedule. Preventive application of a potent corticosteroid cream should be used in the routine and instituted at the start of RT....... schedules as well as for anatomical sites, skin type, breast size and BMI. Patients treated the irradiated area during the radiation period and two weeks following cessation of radiation. RESULTS: Patients receiving hypofraction RT developed less skin reactions than those treated with conventional RT...

  15. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  16. Prevalence of α(+)-Thalassemia in the Scheduled Tribe and Scheduled Caste Populations of Damoh District in Madhya Pradesh, Central India.

    Science.gov (United States)

    Singh, Mendi P S S; Gupta, Rasik B; Yadav, Rajiv; Sharma, Ravendra K; Shanmugam, Rajasubramaniam

    2016-08-01

    This study was carried out to ascertain the allelic frequency of α(+)-thalassemia (α(+)-thal) in Scheduled caste and scheduled tribe populations of the Damoh district of Madhya Pradesh, India. Random blood samples of Scheduled tribe (267) and Scheduled caste (168), considering the family as a sampling unit, were analyzed for the presence of the -α(3.7) (rightward) (NG_000006.1: g.34164_37967del3804) and -α(4.2) (leftward) (AF221717) deletions. α(+)-Thal was significantly higher in the Scheduled tribals (77.9%) as compared to the scheduled caste population (9.0%). About 58.0% scheduled tribals carried at least one chromosome with the -α(3.7) deletion and 20.0% scheduled tribals carried the -α(4.2) deletion. Frequency for the -α(3.7) allele was 0.487 in the scheduled tribal populations in comparison to 0.021 in scheduled castes. Allelic frequency for -α(4.2) was 0.103 and 0.024, respectively, in the above communities. No Hardy-Weinberg equilibrium for α-thal gene (p population, indicating the presence of selection pressures in favor of α-thal mutation and adaptation.

  17. Geophysical Survey in Sub-Saharan Africa: magnetic and Electromagnetic Investigation of the UNESCO World Heritage Site of Songo Mnara, Tanzania

    OpenAIRE

    Welham, Kate; Fleisher, J.; Cheetham, Paul; Manley, Harry; Steele, C.; Wynne-Jones, S.

    2014-01-01

    Magnetometry and Slingram electromagnetic surveys were\\ud conducted at the UNESCO World Heritage Site of Songo Mnara, Tanzania, as part of a multi-national programme of investigation to examine the uses of space within and outside of this stonetown. The town was a major Islamic trading port during the 14th and 15th centuries.The surveys detected significant evidence for the containment of activities within the town walls, and previously unknown anthropogenic activity was revealed between the ...

  18. Seismic-reflection and ground penetrating radar for environmental site characterization. 1998 annual progress report

    International Nuclear Information System (INIS)

    Plumb, R.; Steeples, D.W.

    1998-01-01

    'The project''s goals are threefold: (1) to examine the complementary site-characterization capabilities of modern, three-component shallow-seismic techniques and ground-penetrating radar (GPR) methods at depths ranging from 2 to 8 m at an existing test site; (2) to demonstrate the usefulness of the two methods when used in concert to characterize, in three-dimensions, the cone of depression of a pumping well, which will serve as a proxy site for fluid-flow at an actual, polluted site; and (3) to use the site as an outdoor mesoscale laboratory to validate existing three-dimensional ground-penetrating radar and seismic-reflection computer models developed at the Univ. of Kansas. To do this, useful seismic and GPR data are being collected along the same line(s) and within the same depth range. The principal investigators selected a site in central Kansas as a primary location and, although the site itself is not environmentally sensitive, the location chosen offers particularly useful attributes for this research and will serve as a proxy site for areas that are contaminated. As part of an effort to evaluate the strengths of each method, the authors will repeat the seismic and GPR surveys on a seasonal basis to establish how the complementary information obtained varies over time. Because the water table fluctuates at this site on a seasonal basis, variations in the two types of data over time also can be observed. Such noninvasive in-situ methods of identifying and characterizing the hydrologic flow regimes at contaminated sites support the prospect of developing effective, cost-conscious cleanup strategies in the near future. As of the end of May 1998, the project is on schedule. The first field work was conducted using both of the geophysical survey methods in October of 1997, and the second field survey employed both methods in March of 1998. One of the stated tasks is to reoccupy the same survey line on a quarterly basis for two years to examine change in both

  19. Environmental radioactivity survey in site studies

    International Nuclear Information System (INIS)

    Segovia, N.; Gaso, M.I.; Tejera, A.; Tamez, E.

    1989-01-01

    Systematic monitoring of Rn in soil, background gamma levels and meteorological measurements was conducted at the site of a nuclear research center. The data cover a time period of several years. The radon in soil gas fluctuations is influenced by seasonal meteorological changes and by local geophysical parameters and they range between 1000 Bq/m 3 and 18000 Bq/m 3 . The observed gamma levels show geographic stability; some seasonal fluctuations were observed. Data analysis indicates that no significant changes occured at the site over the measuring period and radiation levels and meteorological changes are moderate inducing no ecological impact on the surroundings. (author) 8 refs.; 5 figs.; 2 tabs

  20. Optometry Australia Scope of Practice Survey 2015.

    Science.gov (United States)

    Kiely, Patricia M; Cappuccio, Skye; McIntyre, Ellen

    2017-05-01

    This paper presents results from the inaugural Scope of Practice Survey of Optometry Australia members conducted in October 2015. The survey gathered information related to confidence in detecting and diagnosing key ocular conditions, grading diabetic retinopathy, prescribing scheduled medicines, access to equipment, confidence using equipment, incidence of patients requiring therapeutic management, referral practices and services provided. The survey was developed, piloted, modified and administered to members of Optometry Australia (excluding student and retired members), who had a current email address. Results were collated and analysed using Microsoft Excel. Of the 587 optometrists in clinical practice who responded, 254 (43 per cent) had therapeutic endorsement of registration. The majority of respondents practised in a major city or surrounding suburbs (63 per cent). Independent practice was the most frequently cited practice type (58 per cent). The estimated average number of patients seen in a week was 48; there was a steady decrease in the number of patients per week with increasing age, from 53 for optometrists in their 20s to 27 for optometrists aged over 70. There was very high confidence (over 93 per cent) in ability to grade diabetic retinopathy and diagnose a range of ocular conditions. Confidence in performance of more advanced techniques was higher for endorsed than non-endorsed optometrists. Approximately 12 per cent of patients required a Schedule 4 therapeutic prescription. The most frequently recommended over-the-counter medications were for dry eye for both endorsed and non-endorsed optometrists. The most frequently prescribed Schedule 4 medications were anti-inflammatories. The most challenging conditions to prescribe for were glaucoma, microbial keratitis and uveitis. Approximately one in six therapeutically endorsed optometrists reported unexpected side effects of medications they had prescribed. Information from the survey will guide

  1. 48 CFR 552.238-80 - Use of Federal Supply Schedule Contracts by Certain Entities-Recovery Purchasing.

    Science.gov (United States)

    2010-10-01

    ... disaster recovery purchasing is accessible in GSA's Schedules e-Library at Web site http://www.gsaelibrary... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Use of Federal Supply... Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CLAUSES AND FORMS SOLICITATION PROVISIONS AND...

  2. Radiological survey of the inactive uranium-mill tailings at the Spook site, Converse County, Wyoming

    International Nuclear Information System (INIS)

    Haywood, F.F.; Christian, D.J.; Chou, K.D.; Ellis, B.S.; Lorenzo, D.; Shinpaugh, W.H.

    1980-05-01

    Results of a radiological survey performed at the Spook site in Converse County, Wyoming, in June 1976, are presented. The mill at this site was located a short distance from the open-pit mine where the ore was obtained and where part of the tailings was dumped into the mine. Several piles of overburden or low-grade ore in the vicinity were included in the measurements of above-ground gamma exposure rate. The average exposure rate over these piles varied from 14 μR/hr, the average background exposure rate for the area, to 140 μR/hr. The average exposure rate for the tailings and former mill area was 220 μR/hr. Movement of tailings particles down dry washes was evident. The calculated concentration of 226 Ra in ten holes as a function of depth is presented graphically

  3. Collaborative Scheduling between OSPPs and Gasholders in Steel Mill under Time-of-Use Power Price

    Directory of Open Access Journals (Sweden)

    Juxian Hao

    2017-08-01

    Full Text Available Byproduct gases generated during steel production process are the main fuels for on-site power plants (OSPPs in steel enterprises. Recently, with the implementation of time-of-use (TOU power price in China, increasing attention has been paid to the collaborative scheduling between OSPPs and gasholders. However, the load shifting potential of OSPPs has seldom been discussed in previous studies. In this paper, a mixed integer linear programming (MILP-based scheduling model is built to evaluate the load shifting potential and the corresponding economic benefits. A case study is conducted on two steel enterprises with different configurations of OSPPs, and the optimal operation strategy is also discussed.

  4. Interactive Dynamic Mission Scheduling for ASCA

    Science.gov (United States)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  5. Cold vacuum drying facility site evaluation report

    International Nuclear Information System (INIS)

    Diebel, J.A.

    1996-01-01

    In order to transport Multi-Canister Overpacks to the Canister Storage Building they must first undergo the Cold Vacuum Drying process. This puts the design, construction and start-up of the Cold Vacuum Drying facility on the critical path of the K Basin fuel removal schedule. This schedule is driven by a Tri-Party Agreement (TPA) milestone requiring all of the spent nuclear fuel to be removed from the K Basins by December, 1999. This site evaluation is an integral part of the Cold Vacuum Drying design process and must be completed expeditiously in order to stay on track for meeting the milestone

  6. Automated scheduling and planning from theory to practice

    CERN Document Server

    Ozcan, Ender; Urquhart, Neil

    2013-01-01

      Solving scheduling problems has long presented a challenge for computer scientists and operations researchers. The field continues to expand as researchers and practitioners examine ever more challenging problems and develop automated methods capable of solving them. This book provides 11 case studies in automated scheduling, submitted by leading researchers from across the world. Each case study examines a challenging real-world problem by analysing the problem in detail before investigating how the problem may be solved using state of the art techniques.The areas covered include aircraft scheduling, microprocessor instruction scheduling, sports fixture scheduling, exam scheduling, personnel scheduling and production scheduling.  Problem solving methodologies covered include exact as well as (meta)heuristic approaches, such as local search techniques, linear programming, genetic algorithms and ant colony optimisation.The field of automated scheduling has the potential to impact many aspects of our lives...

  7. Evaluation of a committed fusion site. Final report

    International Nuclear Information System (INIS)

    1979-07-01

    This report is divided into five technical sections. Section 2 is a summary. In Section 3, which covers device and site analyses the major characteristics of devices that might be placed at the site, as envisioned by major fusion laboratories, are described; the characteristics of a site (baseline site) which would accommodate these devices are defined; and various approaches to a committed site meeting the baseline site requirements are discussed. Section 4 describes the scenarios selected to represent possible site development outcomes; these scenarios are evaluated with respect to comparative cost and schedule effects. Section 5 presents a brief evaluation of the effects fusion-fission hybrids might have on the committed site. Major conclusions and recommendations are discussed in Section 6

  8. Golden Eagle Territories and Ecology at Site 300

    Energy Technology Data Exchange (ETDEWEB)

    Fratanduono, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-09-29

    Garcia and Associates (GANDA) was contracted by the Lawrence Livermore National Laboratory (LLNL) to collect information on golden eagle (Aquila chrysaetos) use of Site 300. During 2014, we conducted surveys at Site 300 and for an area including a 10-mile radius of Site 300. Those surveys documented 42 golden eagle territories including two territories that overlapped with Site 300. These were named ‘Tesla’ and ‘Linac Road’. In 2015, we conducted surveys to refine the territory boundaries of golden eagle territories that overlapped with Site 300 and to document eagle activity at Site 300.

  9. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  10. An overview of background environmental radiological surveillance around Kudankulam nuclear power project site

    International Nuclear Information System (INIS)

    Rajan, M.P.; Vijayakumar, B.; George, Thomas; Rajan, P.S.; Rana, B.K.; Kumar, M.; Hegde, A.G.; Chougaonkar, M.P.

    2005-01-01

    A modern Environmental Survey Laboratory (ESL) equipped with state-of-art nuclear counting, chemical and ecological equipment's has been set up at Kudankulam at the very beginning of construction activities to carry out pre operational and baseline radioactivity measurements. Construction activities for the two VVER type 1000 MWe reactors at the site are progressing ahead of schedule and the first unit is slated to be critical in the year 2007. This paper presents the results of environmental radiological surveillance carried out for the last one year in Kudankulam environs. General radiation background in the area varies in the range of 0.1 - 0.7 μGy/h and elevated levels as high as 20 μGy/h are noticed in beach areas. The major contribution to the background radiation in high background areas comes from 232 Th and its daughter products. The concentrations of 40 K are of normal order and comparable to other NPP sites and normal background areas. The concentrations of fallout nuclides are very low and are at global fallout levels. (author)

  11. Recent Research Trends in Genetic Algorithm Based Flexible Job Shop Scheduling Problems

    Directory of Open Access Journals (Sweden)

    Muhammad Kamal Amjad

    2018-01-01

    Full Text Available Flexible Job Shop Scheduling Problem (FJSSP is an extension of the classical Job Shop Scheduling Problem (JSSP. The FJSSP is known to be NP-hard problem with regard to optimization and it is very difficult to find reasonably accurate solutions of the problem instances in a rational time. Extensive research has been carried out in this area especially over the span of the last 20 years in which the hybrid approaches involving Genetic Algorithm (GA have gained the most popularity. Keeping in view this aspect, this article presents a comprehensive literature review of the FJSSPs solved using the GA. The survey is further extended by the inclusion of the hybrid GA (hGA techniques used in the solution of the problem. This review will give readers an insight into use of certain parameters in their future research along with future research directions.

  12. Online Scheduling in Manufacturing A Cumulative Delay Approach

    CERN Document Server

    Suwa, Haruhiko

    2013-01-01

    Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the ...

  13. Limited Preemptive Scheduling in Real-time Systems

    OpenAIRE

    Thekkilakattil, Abhilash

    2016-01-01

    Preemptive and non-preemptive scheduling paradigms typically introduce undesirable side effects when scheduling real-time tasks, mainly in the form of preemption overheads and blocking, that potentially compromise timeliness guarantees. The high preemption overheads in preemptive real-time scheduling may imply high resource utilization, often requiring significant over-provisioning, e.g., pessimistic Worst Case Execution Time (WCET) approximations. Non-preemptive scheduling, on the other hand...

  14. Plans for characterization of salt sites

    International Nuclear Information System (INIS)

    Heim, G.E.; Matthews, S.C.; Kircher, J.F.; Kennedy, R.K.

    1983-01-01

    This basic salt site characterization program has been designed to provide the data required to support the design, performance assessment, and licensing of each of the principal project elements: the repository, the shafts, and the surface facilities. The work has been sequenced to meet the design and licensing schedule. It is anticipated that additional characterization activities will be performed to address site-specific considerations and to provide additional information to address questions which arise during the evaluation of characterization data. 3 figures, 3 tables

  15. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  16. Energy-conserving site-design case study, Radisson, New York. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-12-01

    Radisson is a 2,950-acre new community currently being developed by the New York State Urban Development Corporation and located in central New York, 12 miles north-west of Syracuse. Case-study sites selected for this project are a 95-acre residential site and the 51-acre Town Center of the new community. Development on the Residential Site is a low-density (2.8 dwelling units/acre) mixture of single-family, townhouse and multi-family units. Development on the Town Center site is a mixture of small-scale commercial use (144,000 sq. ft.) and 330+ multi-family dwelling units. Energy-conserving plans developed for both sites have focused on passive measures to reduce energy use for space heating. Utility-system options have been identified for both sites, but require further study as to feasibility and cost. This report summarizes energy savings and cost differentials due to passive measures incorporated in both the residential and Town Center Plans. The future implementation schedule, also discussed, summarizes the procedures an schedule required for implementation of the passive measures, as well as further study required for the development of utility-system options. 4 tables.

  17. Dental Student Study Strategies: Are Self-Testing and Scheduling Related to Academic Performance?

    Science.gov (United States)

    McAndrew, Maureen; Morrow, Christina S; Atiyeh, Lindsey; Pierre, Gaëlle C

    2016-05-01

    Self-testing, a strategy wherein a student actively engages in creating questions and answers from study materials to assist with studying, has been found to be especially advantageous because it enhances future retrieval of information. Studies have found correlations among students' grade point averages (GPAs), self-testing, and rereading study strategies, as well as the spacing of study sessions over time. The aim of this study was to assess relationships among dental students' study strategies, scheduling of study time, and academic achievement. A 16-item survey requesting information on study habits, study schedules, and GPAs was distributed to 358 second-year dental students at New York University College of Dentistry. Additionally, the survey asked students to report the average number of hours per week they devoted to studying for didactic courses and preparing for hands-on preclinical courses. Of the 358 students, 94 (26%) responded to the survey. The vast majority of the respondents reported utilizing self-testing and rereading study strategies. High performers (with higher GPAs) were more likely to use self-testing, especially with flashcards, and to space their studying over multiple sessions. Lower performing students were more likely to highlight or underline their notes and to mass their study sessions or cram. Longer hours devoted to studying and practicing for simulation courses were associated with stronger performance; lower performers reported spending significantly fewer hours practicing for simulation courses. Half of the dental students surveyed said that they felt their studying would be more productive in the morning, although 84% reported doing most of their studying in the evening or late night. Sound study decisions depend on accurate regulation of ongoing learning and appropriate use and timing of evidence-based study strategies, so these results suggest that dental students may require guidance in these areas.

  18. Siting a low-level radioactive waste disposal facility in California

    International Nuclear Information System (INIS)

    Romano, S.A.; Gaynor, R.K.

    1991-01-01

    US Ecology is the State of California's designee to site, develop and operate a low-level radioactive waste disposal facility. In March 1988, a site in the Ward Valley of California's Mojave Desert was chosen for development. Strong local community support has been expressed for the site. US Ecology anticipates licensing and constructing a facility to receive waste by early 1991. This schedule places California well ahead of the siting milestones identified in Federal law. (author) 1 fig., 2 refs

  19. Male involvement in reproductive health among scheduled tribe: experience from Khairwars of central India.

    Science.gov (United States)

    Saha, Kalyan B; Singh, Neeru; Chatterjee Saha, Uma; Roy, Jyotirmoy

    2007-01-01

    Indian tribal men's lack of participation in reproductive health not only damages their own health, but also contributes to the reproductive ill health of their female partners and children. In India the involvement of men in such matters is a new concept. There is a paucity of data particularly on Scheduled tribesmen's knowledge and the extent of their participation in reproductive health. This inhibits planning. The present study aims to understand the involvement of Scheduled tribesmen in reproductive health and the barriers to their involvement by generating a database from the Khairwar tribe of Central India. A door-to-door survey on knowledge, attitude and practice relating to aspects of reproductive health was conducted by canvassing a pre-designed interview schedule among 15-40 year old, currently married Khairwar males in the Sidhi district of Madhya Pradesh, India. As far as reproductive morbidity is concerned, only 17% of the respondents had heard of HIV/AIDS, and most had no proper knowledge of its transmission. Although 74% of the respondents had heard about reproductive tract infections, the majority of them were unaware of the mechanism of transmission and seriousness of the problem. The duel role of condoms, both as a method of family planning and a protective measure against sexually transmitted infections, was also unknown to them. Approximately 59% of the males were aware of family planning but only 13% were using any method (mostly female sterilization) at the time of survey. Their view on the ideal number of children (3.56) exceeded the actual number of children born and living. High infant and child mortality influenced their preference for higher fertility. Very few among them (29%) had knowledge of antenatal care. They expressed faulty knowledge, myths and unhelpful attitudes towards sexual health matters. The study revealed the male Scheduled tribe population's lack of knowledge and misinformation regarding male sexual health issues, the

  20. Utilization Bound of Non-preemptive Fixed Priority Schedulers

    Science.gov (United States)

    Park, Moonju; Chae, Jinseok

    It is known that the schedulability of a non-preemptive task set with fixed priority can be determined in pseudo-polynomial time. However, since Rate Monotonic scheduling is not optimal for non-preemptive scheduling, the applicability of existing polynomial time tests that provide sufficient schedulability conditions, such as Liu and Layland's bound, is limited. This letter proposes a new sufficient condition for non-preemptive fixed priority scheduling that can be used for any fixed priority assignment scheme. It is also shown that the proposed schedulability test has a tighter utilization bound than existing test methods.