  1. Site evaluation for nuclear installations. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Siting, which was issued in 1988 as Safety Series No. 50-C-S (Rev. 1). It takes account of developments relating to site evaluations for nuclear installations since the Code on Siting was last revised. These developments include the issuing of the Safety Fundamentals publication on The Safety of Nuclear Installations, and the revision of various safety standards and other publications relating to safety. Requirements for site evaluation are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear installations. It is recognized that there are steady advances in technology and scientific knowledge, in nuclear safety and in what is considered adequate protection. Safety requirements change with these advances and this publication reflects the present consensus among States. This Safety Requirements publication was prepared under the IAEA programme on safety standards for nuclear installations. It establishes requirements and provides criteria for ensuring safety in site evaluation for nuclear installations. The Safety Guides on site evaluation listed in the references provide recommendations on how to meet the requirements established in this Safety Requirements publication. The objective of this publication is to establish the requirements for the elements of a site evaluation for a nuclear installation so as to characterize fully the site specific conditions pertinent to the safety of a nuclear installation. The purpose is to establish requirements for criteria, to be applied as appropriate to site and site-installation interaction in operational states and accident conditions, including those that could lead to emergency measures for: (a) Defining the extent of information on a proposed site to be presented by the applicant; (b) Evaluating a proposed site to ensure that the site

  2. Prospective safety performance evaluation on construction sites.

    Science.gov (United States)

    Wu, Xianguo; Liu, Qian; Zhang, Limao; Skibniewski, Miroslaw J; Wang, Yanhong

    2015-05-01

    This paper presents a systematic Structural Equation Modeling (SEM) based approach for Prospective Safety Performance Evaluation (PSPE) on construction sites, with causal relationships and interactions between enablers and the goals of PSPE taken into account. According to a sample of 450 valid questionnaire surveys from 30 Chinese construction enterprises, a SEM model with 26 items included for PSPE in the context of Chinese construction industry is established and then verified through the goodness-of-fit test. Three typical types of construction enterprises, namely the state-owned enterprise, private enterprise and Sino-foreign joint venture, are selected as samples to measure the level of safety performance given the enterprise scale, ownership and business strategy are different. Results provide a full understanding of safety performance practice in the construction industry, and indicate that the level of overall safety performance situation on working sites is rated at least a level of III (Fair) or above. This phenomenon can be explained that the construction industry has gradually matured with the norms, and construction enterprises should improve the level of safety performance as not to be eliminated from the government-led construction industry. The differences existing in the safety performance practice regarding different construction enterprise categories are compared and analyzed according to evaluation results. This research provides insights into cause-effect relationships among safety performance factors and goals, which, in turn, can facilitate the improvement of high safety performance in the construction industry. Copyright © 2015 Elsevier Ltd. All rights reserved.

  3. Preliminary safety evaluation for the Laxemar subarea. Based on data and site descriptions after the initial site investigation stage

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Johan [JA Streamflow AB, Aelvsjoe (Sweden)

    2006-03-15

    The main objectives of this Preliminary Safety Evaluation (PSE) of the Laxemar subarea have been to determine, with limited efforts, whether the feasibility study's judgement of the suitability of the candidate area with respect to long-term safety holds up in the light of the actual site investigation data; to provide feedback to continued site investigations and site-specific repository design and to identify site-specific scenarios and geoscientific issues for further analyses. The PSE focuses on comparing the attained knowledge of the sites with the suitability criteria as set out by SKB in 2000. These criteria both concern properties of the site judged to be necessary for safety and engineering (requirements) and properties judged to be beneficial (preferences). The findings are then evaluated in order to provide feedback to continued investigations and design work. The PSE does not aim at comparing sites and does not assess compliance with safety and radiation protection criteria. The latter is eventually done in coming Safety Assessments. This preliminary safety evaluation shows that, according to existing data, the Laxemar subarea meets all safety requirements. The evaluation also shows that the Laxemar subarea meets most of the safety preferences, but for some aspects of the site description further reduction of the uncertainties would enhance the safety case. Despite the stated concerns, there is no reason, from a safety point of view, not to continue the Site Investigations at the Laxemar subarea. There are uncertainties to resolve and the safety would eventually need to be verified through a proper safety assessment. Only some of the uncertainties noted in the Site Descriptive Model have safety implications and need further resolution for this reason. Furthermore, uncertainties may need resolving for other reasons, such as giving an adequate assurance of site understanding or assisting in optimising design. Notably, there are questions about the

  4. Preliminary safety evaluation for the Laxemar subarea. Based on data and site descriptions after the initial site investigation stage

    International Nuclear Information System (INIS)

    Andersson, Johan

    2006-03-01

    The main objectives of this Preliminary Safety Evaluation (PSE) of the Laxemar subarea have been to determine, with limited efforts, whether the feasibility study's judgement of the suitability of the candidate area with respect to long-term safety holds up in the light of the actual site investigation data; to provide feedback to continued site investigations and site-specific repository design and to identify site-specific scenarios and geoscientific issues for further analyses. The PSE focuses on comparing the attained knowledge of the sites with the suitability criteria as set out by SKB in 2000. These criteria both concern properties of the site judged to be necessary for safety and engineering (requirements) and properties judged to be beneficial (preferences). The findings are then evaluated in order to provide feedback to continued investigations and design work. The PSE does not aim at comparing sites and does not assess compliance with safety and radiation protection criteria. The latter is eventually done in coming Safety Assessments. This preliminary safety evaluation shows that, according to existing data, the Laxemar subarea meets all safety requirements. The evaluation also shows that the Laxemar subarea meets most of the safety preferences, but for some aspects of the site description further reduction of the uncertainties would enhance the safety case. Despite the stated concerns, there is no reason, from a safety point of view, not to continue the Site Investigations at the Laxemar subarea. There are uncertainties to resolve and the safety would eventually need to be verified through a proper safety assessment. Only some of the uncertainties noted in the Site Descriptive Model have safety implications and need further resolution for this reason. Furthermore, uncertainties may need resolving for other reasons, such as giving an adequate assurance of site understanding or assisting in optimising design. Notably, there are questions about the

  5. Meteorological events in site evaluation for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide provides recommendations and guidance on conducting hazard assessments of extreme and rare meteorological phenomena. It is of interest to safety assessors and regulators involved in the licensing process as well as to designers of nuclear power plants. This Safety Guide was prepared under the IAEA programme for safety standards for nuclear power plants. It supplements the IAEA Safety Requirements publication on Site Evaluation for Nuclear Facilities which is to supersede the Code on the Safety of Nuclear Power Plants: Siting, Safety Series No. 50-C-S (Rev. 1), IAEA, Vienna (1988). The present Safety Guide supersedes two earlier Safety Guides: Safety Series No. 50-SG-S11A (1981) on Extreme Meteorological Events in Nuclear Power Plant Siting, Excluding Tropical Cyclones and Safety Series No. 50-SG-S11B (1984) on Design Basis Tropical Cyclone for Nuclear Power Plants. The purpose of this Safety Guide is to provide recommendations and guidance on conducting hazard assessments of extreme and rare meteorological phenomena. This Safety Guide provides interpretation of the Safety Requirements publication on Site Evaluation for Nuclear Facilities and guidance on how to fulfil these requirements. It is aimed at safety assessors or regulators involved in the licensing process as well as designers of nuclear power plants, and provides them with guidance on the methods and procedures for analyses that support the assessment of the hazards associated with extreme and rare meteorological events. This Safety Guide discusses the extreme values of meteorological variables and rare meteorological phenomena, as well as their rates of occurrence, according to the following definitions: (a) Extreme values of meteorological variables such as air temperature and wind speed characterize the meteorological or climatological environment. And (b) Rare meteorological phenomena

  6. Seismic Hazards in Site Evaluation for Nuclear Installations. Specific Safety Guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-08-15

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear installations. It supplements the Safety Requirements publication on Site Evaluation for Nuclear Installations. The present publication provides guidance and recommends procedures for the evaluation of seismic hazards for nuclear power plants and other nuclear installations. It supersedes Evaluation of Seismic Hazards for Nuclear Power Plants, IAEA Safety Standards Series No. NS-G-3.3 (2002). In this publication, the following was taken into account: the need for seismic hazard curves and ground motion spectra for the probabilistic safety assessment of external events for new and existing nuclear installations; feedback of information from IAEA reviews of seismic safety studies for nuclear installations performed over the previous decade; collective knowledge gained from recent significant earthquakes; and new approaches in methods of analysis, particularly in the areas of probabilistic seismic hazard analysis and strong motion simulation. In the evaluation of a site for a nuclear installation, engineering solutions will generally be available to mitigate, by means of certain design features, the potential vibratory effects of earthquakes. However, such solutions cannot always be demonstrated to be adequate for mitigating the effects of phenomena of significant permanent ground displacement such as surface faulting, subsidence, ground collapse or fault creep. The objective of this Safety Guide is to provide recommendations and guidance on evaluating seismic hazards at a nuclear installation site and, in particular, on how to determine: (a) the vibratory ground motion hazards, in order to establish the design basis ground motions and other relevant parameters for both new and existing nuclear installations; and (b) the potential for fault displacement and the rate of fault displacement that could affect the feasibility of the site or the safe operation of the installation at

  7. Criticality Safety Evaluation of Hanford Site High Level Waste Storage Tanks

    Energy Technology Data Exchange (ETDEWEB)

    ROGERS, C.A.

    2000-02-17

    This criticality safety evaluation covers operations for waste in underground storage tanks at the high-level waste tank farms on the Hanford site. This evaluation provides the bases for criticality safety limits and controls to govern receipt, transfer, and long-term storage of tank waste. Justification is provided that a nuclear criticality accident cannot occur for tank farms operations, based on current fissile material and operating conditions.

  8. Criticality Safety Evaluation of Hanford Site High-Level Waste Storage Tanks

    International Nuclear Information System (INIS)

    ROGERS, C.A.

    2000-01-01

    This criticality safety evaluation covers operations for waste in underground storage tanks at the high-level waste tank farms on the Hanford site. This evaluation provides the bases for criticality safety limits and controls to govern receipt, transfer, and long-term storage of tank waste. Justification is provided that a nuclear criticality accident cannot occur for tank farms operations, based on current fissile material and operating conditions

  9. A plan for safety evaluation of tsunamis at the Uljin nuclear power plant site

    International Nuclear Information System (INIS)

    Lee, H. K.; Lee, D. S.

    1999-01-01

    The sites of many nuclear and thermal power plants are located along the coast line to obtain necessary cooling water. Therefore, they are vulnerable to coastal disasters like tsunamis. The safety evaluation on tsunamis of the site of Uljin nuclear power plants was performed with the maximum potential earthquake magnitude and related fault parameters in 1986. But according to the results of recent research, the possibility was suggested that the earthquake which has bigger magnitude than was expected is likely to happen in the seismic gaps near Akita, Japan. Therefore, a plan for safety evaluation of tsunamis at the Uljin nuclear power plants was laid out

  10. Preliminary safety evaluation, based on initial site investigation data. Planning document

    International Nuclear Information System (INIS)

    Hedin, Allan

    2002-12-01

    This report is a planning document for the preliminary safety evaluations (PSE) to be carried out at the end of the initial stage of SKBs ongoing site investigations for a deep repository for spent nuclear fuel. The main purposes of the evaluations are to determine whether earlier judgements of the suitability of the candidate area for a deep repository with respect to long-term safety holds up in the light of borehole data and to provide feed-back to continued site investigations and site specific repository design. The preliminary safety evaluations will be carried out by a safety assessment group, based on a site model, being part of a site description, provided by a site modelling group and a repository layout within that model suggested by a repository engineering group. The site model contains the geometric features of the site as well as properties of the host rock. Several alternative interpretations of the site data will likely be suggested. Also the biosphere is included in the site model. A first task for the PSE will be to compare the rock properties described in the site model to previously established criteria for a suitable host rock. This report gives an example of such a comparison. In order to provide more detailed feedback, a number of thermal, hydrological, mechanical and chemical analyses of the site will also be included in the evaluation. The selection of analyses is derived from the set of geosphere and biosphere analyses preliminarily planned for the comprehensive safety assessment named SR-SITE, which will be based on a complete site investigation. The selection is dictated primarily by the expected feedback to continued site investigations and by the availability of data after the PSE. The repository engineering group will consider several safety related factors in suggesting a repository layout: Thermal calculations will be made to determine a minimum distance between canisters avoiding canister surface temperatures above 100 deg C

  11. Preliminary safety evaluation for the Simpevarp subarea. Based on data and site descriptions after the initial site investigation stage

    International Nuclear Information System (INIS)

    2005-04-01

    The main objectives of this Preliminary safety evaluation (PSE) of the Simpevarp subarea are: to determine, whether the feasibility study's judgement of the suitability of the candidate area with respect to long-term safety holds up in the light of the site investigation data; to provide feedback to continued site investigations and site-specific repository design and to identify site specific scenarios and geoscientific issues for further analyses. The PSE focuses on comparing the attained knowledge of the sites with the suitability criteria as set out by SKB in the report SKB-TR--00-12. These criteria both concern properties of the site judged to be necessary for safety and engineering (requirements) and properties judged to be beneficial (preferences). The findings are then evaluated in order to provide feedback to continued investigations and design work. The PSE does not aim at comparing sites and does not assess compliance with safety and radiation protection criteria. The evaluation shows that even considering remaining uncertainties, the Simpevarp subarea meets all safety requirements and most of the safety preferences. Consequently, from a safety point of view, there is no reason not to continue the Site Investigations of the Simpevarp subarea. There are still uncertainties to resolve and the safety would eventually need to be verified through a full safety assessment. Still, this Preliminary Safety Evaluation demonstrates that it is likely that a safe repository for spent nuclear fuel of the KBS-3 type could be constructed at the site. The following feedback is provided to the site investigations and the associated site modelling: Reducing the uncertainty on the deformation zone geometry within the Simpevarp subarea would allow for a more specified layout, although the sensitivity analysis shows that the space needed is rather robust with respect to uncertainties in the zones. There is substantial uncertainty in the discrete fracture network (DFN) model

  12. Geotechnical aspects of site evaluation and foundations for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2003-01-01

    This publication is a revision of the former safety standards of IAEA Safety Series No. 50-SG-S8. The scope has been extended to cover not only foundations but also design questions related to geotechnical science and engineering, such as the bearing capacity of foundations, design of earth structures and design of buried structures. Seismic aspects also play an important role in this field, and consequently the Safety Guide on Evaluation of Seismic Hazards for Nuclear Power Plants, Safety Standards Series No. NS-G-3.3, which discusses the determination of seismic input motion, is referenced on several occasions. The present Safety Guide provides an interpretation of the Safety Requirements on Site Evaluation for Nuclear Installations and guidance on how to implement them. It is intended for the use of safety assessors or regulators involved in the licensing process as well as the designers of nuclear power plants, and it provides them with guidance on the methods and procedures for analyses to support the assessment of the geotechnical aspects of the safety of nuclear power plants

  13. Geotechnical aspects of site evaluation and foundations for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2006-01-01

    This publication is a revision of the former safety standards of IAEA Safety Series No. 50-SG-S8. The scope has been extended to cover not only foundations but also design questions related to geotechnical science and engineering, such as the bearing capacity of foundations, design of earth structures and design of buried structures Seismic aspects also play an important role in this field, and consequently the Safety Guide on Evaluation of Seismic Hazards for Nuclear Power Plants, Safety Standards Series No. NS-G-3.3, which discusses the determination of seismic input motion, is referenced on several occasions. The present Safety Guide provides an interpretation of the Safety Requirements on Site Evaluation for Nuclear Installations and guidance on how to implement them. It is intended for the use of safety assessors or regulators involved in the licensing process as well as the designers of nuclear power plants, and it provides them with guidance on the methods and procedures for analyses to support the assessment of the geotechnical aspects of the safety of nuclear power plants

  14. External human induced events in site evaluation for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    The purpose of the present Safety Guide is to provide recommendations and guidance for the examination of the region considered for site evaluation for a plant in order to identity hazardous phenomena associated with human induced events initiated by sources external to the plant. In some cases it also presents preliminary guidance for deriving values of relevant parameters for the design basis. This Safety Guide is also applicable for periodic site evaluation and site evaluation following a major human induced event, and for the design and operation of the site's environmental monitoring system. Site evaluation includes site characterization. Consideration of external events that could lead to a degradation of the safety features of the plant and cause a release of radioactive material from the plant and/or affect the dispersion of such material in the environment. And consideration of population issues and access issues significant to safety (such as the feasibility of evacuation, the population distribution and the location of resources). The process of site evaluation continues throughout the lifetime of the facility, from siting to design, construction, operation and decommissioning. The external human induced events considered in this Safety Guide are all of accidental origin. Considerations relating to the physical protection of the plant against wilful actions by third parties are outside its scope. However, the methods described herein may also have some application for the purposes of such physical protection. The present Safety Guide may also be used for events that may originate within the boundaries of the site, but from sources which are not directly involved in the operational states of the nuclear power plant units, such as fuel depots or areas for the storage of hazardous materials for the construction of other facilities at the same site. Special consideration should be given to the hazardous material handled during the construction, operation and

  15. Nuclear installations sites safety

    International Nuclear Information System (INIS)

    Barber, P.; Candes, P.; Duclos, P.; Doumenc, A.; Faure, J.; Hugon, J.; Mohammadioun, B.

    1988-11-01

    This report is divided into ten parts bearing: 1 Safety analysis procedures for Basis Nuclear Installations sites (BNI) in France 2 Site safety for BNI in France 3 Industrial and transport activities risks for BNI in France 4 Demographic characteristics near BNI sites in France 5 Meteorologic characteristics of BNI sites in France 6 Geological aspects near the BNI sites in France 7 Seismic studies for BNI sites in France 8 Hydrogeological aspects near BNI sites in France 9 Hydrological aspects near BNI sites in France 10 Ecological and radioecological studies of BNI sites in France [fr

  16. Preliminary safety evaluation for the Forsmark area. Based on data and site descriptions after the initial site investigation stage

    International Nuclear Information System (INIS)

    Andersson, Johan

    2005-08-01

    The main objectives of this Preliminary Safety Evaluation (PSE) of the Forsmark area have been to determine, with limited efforts, whether the feasibility study's judgement of the suitability of the candidate area with respect to long-term safety holds up in the light of the actual site investigation data; to provide feedback to continued site investigations and site-specific repository design and to identify site-specific scenarios and geoscientific issues for further analyses. The PSE focuses on comparing the attained knowledge of the sites with the suitability criteria as set out by SKB. The PSE does not aim at comparing sites and does not assess compliance with safety and radiation protection criteria. The evaluation shows that, even considering remaining uncertainties, the Forsmark area meets all stated safety requirements and preferences. Consequently, from a safety point of view, there is no reason not to continue the Site Investigations of the Forsmark area. There are still uncertainties to resolve and the safety would eventually need to be verified through a full safety assessment. Nevertheless, this Preliminary Safety Evaluation demonstrates that it is likely that a safe repository for spent nuclear fuel of the KBS-3 type could be constructed at the site. The following feedback is provided to the site investigations and the associated site modelling: Reducing the uncertainty on the deformation zone geometry inside the target area would be needed to more firmly define locations of the suitable deposition volumes. There is substantial uncertainty in the Discrete Fracture Network model. Further reduction of the uncertainties, if needed, would probably only be possible from the underground, detailed investigation phase. Efforts need also be spent on improving the DFN-modelling. There are assumptions made in current models that could be challenged and there seems to be room for better use of the borehole information. It is particularly important to provide

  17. Preliminary safety evaluation for the Forsmark area. Based on data and site descriptions after the initial site investigation stage

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Johan [JA Streamflow AB, Aelvsjoe (Sweden)

    2005-08-01

    The main objectives of this Preliminary Safety Evaluation (PSE) of the Forsmark area have been to determine, with limited efforts, whether the feasibility study's judgement of the suitability of the candidate area with respect to long-term safety holds up in the light of the actual site investigation data; to provide feedback to continued site investigations and site-specific repository design and to identify site-specific scenarios and geoscientific issues for further analyses. The PSE focuses on comparing the attained knowledge of the sites with the suitability criteria as set out by SKB. The PSE does not aim at comparing sites and does not assess compliance with safety and radiation protection criteria. The evaluation shows that, even considering remaining uncertainties, the Forsmark area meets all stated safety requirements and preferences. Consequently, from a safety point of view, there is no reason not to continue the Site Investigations of the Forsmark area. There are still uncertainties to resolve and the safety would eventually need to be verified through a full safety assessment. Nevertheless, this Preliminary Safety Evaluation demonstrates that it is likely that a safe repository for spent nuclear fuel of the KBS-3 type could be constructed at the site. The following feedback is provided to the site investigations and the associated site modelling: Reducing the uncertainty on the deformation zone geometry inside the target area would be needed to more firmly define locations of the suitable deposition volumes. There is substantial uncertainty in the Discrete Fracture Network model. Further reduction of the uncertainties, if needed, would probably only be possible from the underground, detailed investigation phase. Efforts need also be spent on improving the DFN-modelling. There are assumptions made in current models that could be challenged and there seems to be room for better use of the borehole information. It is particularly important to

  18. Safety Evaluation Report Restart of K-Reactor Savannah River Site

    International Nuclear Information System (INIS)

    1991-10-01

    In April 1991, the Department of Energy (DOE) issued DOE/DP-0084T, ''Safety Evaluation Report Restart of K-Reactor Savannah River Site.'' The Safety Evaluation Report (SER) documents the results of DOE reviews and evaluations of the programmatic aspects of a large number of issues necessary to be satisfactorily addressed before restart. The issues were evaluated for compliance with the restart criteria included in the SER. The results of those evaluations determined that the restart criteria had been satisfied for some of the issues. However, for most of the issues at least part of the applicable restart criteria had not been found to be satisfied at the time the evaluations were prepared. For those issues, open or confirmatory items were identified that required resolution. In August 1991, DOE issued DOE/DP-0090T, ''Safety Evaluation Report Restart of K-Reactor Savannah River Site Supplement 1.'' That document was the first Supplement to the April 1991 SER, and documented the resolution of 62 of the open items identified in the SER. This document is the second Supplement to the April 1991 SER. This second SER Supplement documents the resolution of additional open times identified in the SER, and includes a complete list of all remaining SER open items. The resolution of those remaining open items will be documented in future SER Supplements. Resolution of all open items for an issue indicates that its associated restart criteria have been satisfied, and that DOE concludes that the programmatic aspects of the issue have been satisfactorily addressed

  19. Program plan for evaluation of the Ferrocyanide Waste Tank safety issue at the Hanford Site

    International Nuclear Information System (INIS)

    Borsheim, G.L.; Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

    1994-03-01

    This document describes the background, priorities, strategy and logic, and task descriptions for the Ferrocyanide Waste Tank Safety Program. The Ferrocyanide Safety Program was established in 1990 to provide resolution of a major safety issue identified for 24 high-level radioactive waste tanks at the Hanford Site

  20. Safety aspects of siting

    International Nuclear Information System (INIS)

    Rosen, M.

    1976-01-01

    Outline of parameters to be considered in site selection, radiation safety, and mechanisms of radiation release. Radiation doses in tablular form for areas at various distances from the plant. (HP) [de

  1. Safety Evaluation Report: Restart of K-Reactor, Savannah River Site

    International Nuclear Information System (INIS)

    1991-08-01

    In April 1991, the Department of Energy (DOE) issued DOE/DP-0084T, ''Safety Evaluation Report Restart of K-Reactor Savannah River Site.'' The Safety Evaluation Report (SER) documents the results of DOE reviews and evaluations of the programmatic aspects of a large number of issues which need to be satisfactorily addressed before restart. The issues were evaluated for compliance with the restart criteria included in the SER. The results of those evaluations determined that the restart criteria had been satisfied for some of the issues. However, for most of the issues at least part of the applicable restart criteria had not been found to be satisfied a the time the evaluations were prepared. For those issues, open or confirmatory items were identified that required resolution. This document supplements the April 1991 SER. The SER Supplement documents the resolution of several of the open items identified in the SER. Only those issues (sections) for which at least one open item identified in the SER has now been closed are addressed in this Supplement. Additionally, some SER sections had no open items identified. Therefore, this Supplement does not include all sections that were addressed in the SER. If there are any open items remaining to be resolved for the sections included in this Supplement, that is so identified at the end of the section. The resolution of those remaining open times, and all remaining open items for those SER sections not included in this first Supplement, will be documented in future SER Supplements. Resolution of all open items for an issue indicates that its associated restart criteria have been satisfied, and that DOE concludes that the programmatic aspects of the issue have been satisfactorily addressed

  2. Radiological safety evaluation for a Waste Transfer Facility at Savannah River Site

    International Nuclear Information System (INIS)

    Ades, M.J.

    1993-01-01

    This paper provides a review of the radiological safety evaluation performed for a Waste Transfer Facility (WTF) located at the Savannah River Site (SRS). This facility transfers liquid radioactive waste between various waste processing facilities and waste storage facilities. The WTF includes functional components such as the diversion box and the pump pits, waste transfer lines, and the outside yard service piping and electrical services. The WSRC methodology is used to evaluate the consequences of postulated accidents that result in the release of radioactive material. Such accidents include transfer line breaks, underground liquid pathway release, fire in pump tank cells and HEPA filters, accidents due to natural phenomena, and externally induced events. Chemical hazards accidents are not considered. The analysis results indicate that the calculated mean onsite and offsite radiological consequences are bounded by the corresponding WSRC dose limits for each accident considered. Moreover, the results show that the maximum onsite and offsite doses calculated for the WTF are lower than the maximum doses determined for the whole radioactive waste facility where the WTF is located

  3. Restart of K-Reactor, Savannah River Site: Safety evaluation report

    International Nuclear Information System (INIS)

    1991-04-01

    This Safety Evaluation Report (SER) focuses on those issues required to support the restart of the K-Reactor at the Savannah River Plant. This SER provides the safety criteria for restart and documents the results of the staff reviews of the DOE and operating contractor activities to meet these criteria. To develop the restart criteria for the issues discussed in this SER, the Savannah River Restart Office and Savannah River Special Projects Office staffs relied, when possible, on commercial industry codes and standards and on NRC requirements and guidelines for the commercial nuclear industry. However, because of the age and uniqueness of the Savannah River reactors, criteria for the commercial plants were not always applicable. In these cases, alternate criteria were developed. The restart criteria applicable to each of the issues are identified in the safety evaluations for each issue. The restart criteria identified in this report are intended to apply only to restart of the Savannah River reactors. Following the development of the acceptance criteria, the DOE staff and their support contractors evaluated the results of the DOE and operating contractor (WSRC) activities to meet these criteria. The results of those evaluations are documented in this report. Deviations or failures to meet the requirements are either justified in the report or carried as open or confirmatory items to be completed and evaluated in supplements to this report before restart. 62 refs., 1 fig

  4. Restart of K-Reactor, Savannah River Site: Safety evaluation report

    Energy Technology Data Exchange (ETDEWEB)

    1991-04-01

    This Safety Evaluation Report (SER) focuses on those issues required to support the restart of the K-Reactor at the Savannah River Plant. This SER provides the safety criteria for restart and documents the results of the staff reviews of the DOE and operating contractor activities to meet these criteria. To develop the restart criteria for the issues discussed in this SER, the Savannah River Restart Office and Savannah River Special Projects Office staffs relied, when possible, on commercial industry codes and standards and on NRC requirements and guidelines for the commercial nuclear industry. However, because of the age and uniqueness of the Savannah River reactors, criteria for the commercial plants were not always applicable. In these cases, alternate criteria were developed. The restart criteria applicable to each of the issues are identified in the safety evaluations for each issue. The restart criteria identified in this report are intended to apply only to restart of the Savannah River reactors. Following the development of the acceptance criteria, the DOE staff and their support contractors evaluated the results of the DOE and operating contractor (WSRC) activities to meet these criteria. The results of those evaluations are documented in this report. Deviations or failures to meet the requirements are either justified in the report or carried as open or confirmatory items to be completed and evaluated in supplements to this report before restart. 62 refs., 1 fig.

  5. New safety standards of nuclear power station with no requirements of site evaluation. No public dose limit published with possible inappropriateness of reactor site

    International Nuclear Information System (INIS)

    Takitani, Koichi

    2013-01-01

    Nuclear Regulation Authority was preparing new safety standards in order to aim at starting safety reviews of existing nuclear power station in July 2013. This article commented on issues of major accident, which was defined as severely damaged core event. Accumulated dose at the site boundary of the Fukushima Daiichi Nuclear Power Station totaled to about 234 mSv on March just after the accident with rare gas of 500 PBq, iodine 131 of 500 PBq, cesium 134 of 10 PBq and cesium 137 of 10 PBq released to the atmosphere, which was beyond 100 mSv. As measures for preventing containment vessel failure after core severely damaged, filtered venting system was required to be installed for low radiological risk to the public. However filter was not effective to rare gas. Accumulated doses at the site boundary of several nuclear power stations after filtered venting with 100% release of rare gas could be estimated to be 2-37 Sv mostly depending on the site condition, which might be surely greater than 100 mSv. Omitting site evaluation for major accident, which was beyond design basis accident, was great concern. (T. Tanaka)

  6. Nuclear power: Siting and safety

    International Nuclear Information System (INIS)

    Openshaw, S.

    1986-01-01

    By 2030, half, or even two-thirds, of all electricity may be generated by nuclear power. Major reactor accidents are still expected to be rare occurrences, but nuclear safety is largely a matter of faith. Terrorist attacks, sabotage, and human error could cause a significant accident. Reactor siting can offer an additional, design-independent margin of safety. Remote geographical sites for new plants would minimize health risks, protect the industry from negative changes in public opinion concerning nuclear energy, and improve long-term public acceptance of nuclear power. U.K. siting practices usually do not consider the contribution to safety that could be obtained from remote sites. This book discusses the present trends of siting policies of nuclear power and their design-independent margin of safety

  7. The IAEA International Seismic Safety Centre and IAEA safety standards for site evaluation and design of NPPs

    International Nuclear Information System (INIS)

    Godoy, A.; Sollogoub, P; )

    2009-01-01

    This presentation covers the following topics: 'Lessons learned' from the occurrence of strong natural events, (tsunamis, earthquakes, hurricanes, etc.) The International Seismic Safety Centre as a global focal point for the nuclear engineering community in those fields. A need for international cooperation, openness and transparency – Sharing of experience

  8. Site-specific evaluation of safety issues for high-level waste disposal in crystalline rocks. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Jobmann, M. (ed.) [DBE Technology GmbH, Peine (Germany)

    2016-03-31

    intent to assist Russian engineers and scientists in their integration into the international scientific community concerned with radioactive waste disposal and to share advanced safety approaches. The corresponding joint R and D activities were pooled in the following three R and D BMWi-funded projects: - ASTER ''Requirements for Site Investigation for a HLW Repository in hard rock Formations'' (2002 - 05), to develop a well-justified methodological approach for site investigation and selection in the Nizhnekansk granitoid formation near Krasnoyarsk, exemplarily for the disposal of conditioned HLW sludge from formerly produced weapons-grade plutonium and vitrified HLW from reprocessing - WIBASTA ''Performance investigation of engineered and geologic barriers of a HLW repository in magmatic host rocks'' (2005 - 08): performance analysis of the system of geologic and engineered barriers based on safety functions, exemplarily for the proposed HLW disposal facility at the Yeniseysky site - URSEL ''Site-specific evaluation of safety issues for HLW disposal in crystalline rocks'' (2008 - 16) Main Objective: Investigation of the robustness of the safety and of the safety assessment of e repository in crystalline rocks. In the last decade of the 20th century, site investigation activities started in various preselected regions of the Nizhnekansky granitoid formation east of Krasnoyarsk. Starting in 2003, preference was given to the Yeniseysky site, which is located several kilometres south east of the underground former production facilities for weapons-grade plutonium of the Mining Chemical Combine (MCC) at Zheleznogorsk. In the beginning, these investigations were performed for the eventual disposal of conditioned HLW sludge from weapons-grade plutonium production and vitrified HLW from reprocessing of the planned reprocessing plant RT-2 at Zheleznogorsk. Recently, priority has been given to so-called class 1 waste

  9. Comparative analysis of safety related site characteristics

    International Nuclear Information System (INIS)

    Andersson, Johan

    2010-12-01

    This document presents a comparative analysis of site characteristics related to long-term safety for the two candidate sites for a final repository for spent nuclear fuel in Forsmark (municipality of Oesthammar) and in Laxemar (municipality of Oskarshamn) from the point of view of site selection. The analyses are based on the updated site descriptions of Forsmark /SKB 2008a/ and Laxemar /SKB 2009a/, together with associated updated repository layouts and designs /SKB 2008b and SKB 2009b/. The basis for the comparison is thus two equally and thoroughly assessed sites. However, the analyses presented here are focussed on differences between the sites rather than evaluating them in absolute terms. The document serves as a basis for the site selection, from the perspective of long-term safety, in SKB's application for a final repository. A full evaluation of safety is made for a repository at the selected site in the safety assessment SR-Site /SKB 2011/, referred to as SR-Site main report in the following

  10. Comparative analysis of safety related site characteristics

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Johan (ed.)

    2010-12-15

    This document presents a comparative analysis of site characteristics related to long-term safety for the two candidate sites for a final repository for spent nuclear fuel in Forsmark (municipality of Oesthammar) and in Laxemar (municipality of Oskarshamn) from the point of view of site selection. The analyses are based on the updated site descriptions of Forsmark /SKB 2008a/ and Laxemar /SKB 2009a/, together with associated updated repository layouts and designs /SKB 2008b and SKB 2009b/. The basis for the comparison is thus two equally and thoroughly assessed sites. However, the analyses presented here are focussed on differences between the sites rather than evaluating them in absolute terms. The document serves as a basis for the site selection, from the perspective of long-term safety, in SKB's application for a final repository. A full evaluation of safety is made for a repository at the selected site in the safety assessment SR-Site /SKB 2011/, referred to as SR-Site main report in the following

  11. Generic Site Safety Report

    CERN Document Server

    International Atomic Energy Agency. Vienna. ITER Joint Central Team

    2001-01-01

    The ITER Engineering Design Activities (EDA) are being conducted jointly by Euratom, Japan, and the Russian Federation, as Parties to the ITER EDA Agreement signed on 21 July 1992 and subsequently extended until July 20th 2001. (The United States of America was an ITER Party until September 30th 1999). The activities are conducted under the auspices of the IAEA by the ITER Joint Central Team and by the Home Teams (HT). The JCT is composed of qualified persons made available by each of the Parties in approximately equal numbers. The JCT members are located at the ITER Joint Work Sites (JWS) in Naka (Japan), Garching (Germany), and formerly in San Diego (USA). The Home Teams are established and organized by each Party for performing the tasks of the work programme for the EDA, assigned to them in approximately equal shares. Home Teams in each of the Parties perform specific design tasks, and perform research and development in technology (physics R&D is contributed voluntarily). The Home Team Leaders (HTL) ...

  12. Radiation safety for site radiography

    International Nuclear Information System (INIS)

    1986-01-01

    This guidance is an update of the 1975 Code of Practice for Site Radiography and is for the use of employers and their radiographers who carry out site work. The subject is discussed under the following headings: Administrative organization, Personnel requirements, Equipment (x-ray and gamma-ray equipment, security, pipeline crawler equipment and safety equipment) Work methods and monitoring, Carriage of sources, Contingency plans, Legal considerations. (U.K.)

  13. Dispersion of radioactive material in air and water and consideration of population distribution in site evaluation for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2002-01-01

    The IAEA issues Safety Requirements and Safety Guides pertaining to nuclear power plants and activities in the field of nuclear energy, on the basis of its Safety Fundamentals publication on The Safety of Nuclear Installations. The present Safety Guide, which supplements the Code on the Safety of Nuclear Power Plants: Siting, concerns the effects of a nuclear power plant on the surrounding region and the consideration of population distribution in the siting of a plant. This Safety Guide makes recommendations on how to meet the requirements of the Code on the Safety of Nuclear Power Plants: Siting, on the basis of knowledge of the mechanisms for the dispersion of effluents discharged into the atmosphere and into surface water and groundwater. Relevant site characteristics and safety considerations are discussed. Population distribution, the projected population growth rate, particular geographical features, the capabilities of local transport networks and communications networks, industry and agriculture in the region, and recreational and institutional activities in the region should be considered in assessing the feasibility of developing an emergency response plan. In the selection of a site for a facility using radioactive material, such as a nuclear power plant, account should be taken of any local features that might be affected by the facility and of the feasibility of off-site intervention, including emergency response and protective actions. This is in addition to the evaluation of any features of the site itself that might affect the safety of the facility. This Safety Guide recommends methods for the assessment of regional and local characteristics. This Safety Guide supersedes four earlier IAEA Safety Guides, namely: Atmospheric Dispersion in Nuclear Power Plant Siting (Safety Series No. 50-SG-S3 (1980)); Site Selection and Evaluation for Nuclear Power Plants with Respect to Population Distribution (Safety Series No. 50-SG-S4 (1980)); Hydrological

  14. Dispersion of radioactive material in air and water and consideration of population distribution in site evaluation for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    The IAEA issues Safety Requirements and Safety Guides pertaining to nuclear power plants and activities in the field of nuclear energy, on the basis of its Safety Fundamentals publication on The Safety of Nuclear Installations. The present Safety Guide, which supplements the Code on the Safety of Nuclear Power Plants: Siting, concerns the effects of a nuclear power plant on the surrounding region and the consideration of population distribution in the siting of a plant. This Safety Guide makes recommendations on how to meet the requirements of the Code on the Safety of Nuclear Power Plants: Siting, on the basis of knowledge of the mechanisms for the dispersion of effluents discharged into the atmosphere and into surface water and groundwater. Relevant site characteristics and safety considerations are discussed. Population distribution, the projected population growth rate, particular geographical features, the capabilities of local transport networks and communications networks, industry and agriculture in the region, and recreational and institutional activities in the region should be considered in assessing the feasibility of developing an emergency response plan. In the selection of a site for a facility using radioactive material, such as a nuclear power plant, account should be taken of any local features that might be affected by the facility and of the feasibility of off-site intervention, including emergency response and protective actions. This is in addition to the evaluation of any features of the site itself that might affect the safety of the facility. This Safety Guide recommends methods for the assessment of regional and local characteristics. This Safety Guide supersedes four earlier IAEA Safety Guides, namely: Atmospheric Dispersion in Nuclear Power Plant Siting (Safety Series No. 50-SG-S3 (1980)). Site Selection and Evaluation for Nuclear Power Plants with Respect to Population Distribution (Safety Series No. 50-SG-S4 (1980)). Hydrological

  15. Scenarios used for the evaluations of the safety of a site for adioactive waste disposal in deep geologic formations

    International Nuclear Information System (INIS)

    Escalier des Orres, P.; Devillers, C.; Cernes, A.

    1989-11-01

    The selection and qualification procedure of a site for radioactive wastes disposal in a deep geologic formation, has begun in France in the early eighties. The public authorities, on ANDRA's proposal, has preselected in 1987 four sites, each of them coppresponding to a type, of geologic formations (granite, clay, salt and shale). Within two years, one of these sites will be chosen for the location of an undergound laboratory. The safety analysis for the site's qualification uses evolution scenarios of the repository and its environment, chosen according to a deterministic method. With an appropriate detail level, are defined a reference scenario and scenario with random events [fr

  16. Safety cases and siting processes

    International Nuclear Information System (INIS)

    Metlay, Daniel; Ewing, Rodney

    2014-01-01

    Central to any process for building a deep-mined geologic repository for high-activity radioactive waste is the development of a safety case. To date, such cases, in various forms have been elaborated for a variety of concepts for geologic disposal, including in salt, clay, argillite, crystalline rock (granite and gneiss) and volcanic tuff formations. In addition to the technical effort required to develop a safety case, increasingly nations have come to believe that it is also critical to obtain the consent of the region or community where the facility might be located. The purpose of this paper is to explore issues associated with just one aspect of consent-based siting: How can such a process be designed so that willingness to accept a site for a repository continues to be meaningful even as new technical knowledge and insights emerge during site characterisation? In short, what is the meaning of 'informed consent' in the context of repository development? (authors)

  17. Analysis and evaluation of the Gorleben site characteristics. Report on the working package 2. Preliminary safety analysis Gorleben

    International Nuclear Information System (INIS)

    Kukla, Peter; Pechnig, Renate; Urai, Janos

    2011-10-01

    The report on analysis and evaluation of the Gorleben site characteristics covers the following chapters: Site characteristics on the hydrology of the cover rock: hydrology and hydraulic properties, geothermal studies, ground water properties and motion, model calculations. Site characteristics on geology of the cover and adjoining rock: borehole explorations, geologic development, 3D geometry of the salt dome Gorleben, geologic development of the salt structure Gorleben. Site characteristics on the saliniferous formation: geophysical exploration, modeling of the internal structure of the salt dome Gorleben, fluids in the salt dome Gorleben. Geotechnical studies at the site: geothermal studies, hydraulic data on the saliniferous formation, thermal model calculations, geomechanical in-situ measurements, mechanical and transport properties, thermo-mechanical modeling. Summarized evaluation of the site characteristics and further research requirement.

  18. Exploration and safety evaluations of salt formations and site selection procedures; Erkundung und Sicherheitsbewertung von Salzformationen und Standortauswahlverfahren

    Energy Technology Data Exchange (ETDEWEB)

    Krapf, Eva Barbara

    2016-12-12

    In 2011 the final decision for the withdrawal from the nuclear energy program was decided in the Federal Republic of Germany. The majority of the produced radioactive waste originate in the operation as well as in the decommissioning and dismantling of nuclear facilities. The long-term containment of especially heat-developing and high-level waste in an underground disposal facility is pursued. The Site Selection Act (StandAG), passed in 2013, defined further procedural steps as well as responsibilities and the way of public participation during the site selection. In this context the newly founded Commission Storage of Highly Radioactive Waste was assigned with the task of giving relevant recommendations based on their investigation of specific aspects and fundamental questions. The objective of this procedure is the selection of the site that can provide the best possible safety for humans and the environment during the defined period of one million years. The Commissions' final report was published in July 2016. In this thesis a possible approach for exploring sites in connection with safety investigations is recommended. The site selection procedure described in the StandAG represents the basis for the considerations. Geoscientific exclusion criteria, minimum requirements as well as weighing criteria can be developed regarding the relevant geoscientific and climatic changes during the defined period of one million years. In contrast to the recommendations made by the Commission Storage of Highly Radioactive Waste no previously existing report has been revised and adapted. Rather, all issues relevant for the long-term containment of radioactive waste in a disposal facility had been newly developed. The considerations are related to salt domes as host rock. Furthermore, according to the StandAG preliminary safety investigations are required in every step of the site selection. The recommendations made in this thesis concerning content and feasibility of

  19. Evaluation of geological documents available for provisional safety analyses of potential sites for nuclear waste repositories - Are additional geological investigations needed?

    International Nuclear Information System (INIS)

    2010-10-01

    The procedure for selecting repository sites for all categories of radioactive waste in Switzerland is defined in the conceptual part of the Sectoral Plan for Deep Geological Repositories, which foresees a selection of sites in three stages. In Stage I, Nagra proposed geological siting regions based on criteria relating to safety and engineering feasibility. The Swiss Government (the Federal Council) is expected to decide on the siting proposals in 2011. The objective of Stage 2 is to prepare proposals for the location of the surface facilities within the planning perimeters defined by the Federal Council in its decision on Stage 1 and to identify potential sites. Nagra also has to carry out a provisional safety analysis for each site and a safety-based comparison of the sites. Based on this, and taking into account the results of the socio-economic-ecological impact studies, Nagra then has to propose at least two sites for each repository type to be carried through to Stage 3. The proposed sites will then be investigated in more detail in Stage 3 to ensure that the selection of the sites for the General Licence Applications is well founded. In order to realise the objectives of the upcoming Stage 2, the state of knowledge of the geological conditions at the sites has to be sufficient to perform the provisional safety analyses. Therefore, in preparation for Stage 2, the conceptual part of the Sectoral Plan requires Nagra to clarify the need for additional investigations aimed at providing input for the provisional safety analyses. The purpose of the present report is to document Nagra's technical-scientific assessment of this need. The focus is on evaluating the geological information based on processes and parameters that are relevant for safety and engineering feasibility. In evaluating the state of knowledge the key question is whether additional information could lead to a different decision regarding the selection of the sites to be carried through to Stage 3

  20. Visualization of Safety Assessment Result Using GIS in SITES

    International Nuclear Information System (INIS)

    Yun, Bong-Yo; Park, Joo Wan; Park, Se-Moon; Kim, Chang-Lak

    2006-01-01

    Site Information and Total Environmental database management System (SITES) is an integrated program for overall data analysis, environmental monitoring, and safety analysis that are produced from the site investigation and environmental assessment of the relevant nuclear facility. SITES is composed of three main modules such as Site Environment Characterization database for Unified and Reliable Evaluation system (SECURE), Safety Assessment INTegration system (SAINT) and Site Useful Data Analysis and ALarm system (SUDAL). The visualization function of safety assessment and environmental monitoring results is designed. This paper is to introduce the visualization design method using Geographic Information System (GIS) for SITES

  1. 10CFR50.59 safety evaluations

    International Nuclear Information System (INIS)

    Grime, L.; Page, E.

    1987-01-01

    As a plant changes from the design phase to the operational phase, new regulations and standards apply. One such regulation is 10CFR50.59 on safety evaluations. Once an operating license is issued, it is mandatory to submit all applicable changes, tests, and experiments to the safety evaluation process. As preparation for this transition, Detroit Edison had procedures in place and conducted personnel training. Reviews of the safety engineering were conducted by the on-site review board. The off-site board delegated detailed reviews of most safety evaluations to the independent safety evaluation group (ISEG). The on-site group review included presentation of complete design packages by engineers. The ISEG and off-site review group's activity focused on safety evaluation. This paper addresses industry trends that were studied, Detroit Edison's recent actions, and industry issues related to 10CFR50.59 safety evaluations

  2. Evaluation of repository safety

    Energy Technology Data Exchange (ETDEWEB)

    Sagar, B.; Patrick, W.; Dasgupta, B.; Mohanty, S. [Center for Nuclear Waste Regulatory Analyses, San Antonio (United States)

    2002-07-01

    The United States high-level waste program requires evaluation of radiological safety during two distinct time intervals. The first interval, commonly referred to as the preclosure period, deals with receipt of waste at the site, transfer into disposal containers, if needed, emplacement in the underground openings, monitoring and maintenance activities, backfill and closure of the underground openings, and decontamination and decommissioning of the surface facilities of the geologic repository. The preclosure period may extend from a few tens of years to as long as a few hundred of years, depending on repository design and societal norms regarding a final decision to permanently seal the repository. During the preclosure or operational period, performance confirmation studies are conducted to provide a basis for updating and reevaluating estimates of postclosure performance and, finally, to provide a basis for a closure decision. The postclosure period during which expected repository performance must meet certain standards may range from ten thousands years, as it does in the United States, to millions of years, as it does in some European nations. Waste handling operations in the preclosure period are to be evaluated in relation to their potential effect on workers, members of general public, and the general environment. During this period, releases of radioactivity are to be monitored and appropriate actions taken whenever established limits are approached or exceeded. Preclosure safety is highly dependent on facility design, operational hardware and automated systems, operational sequences, and reliability of humans involved in operations. Preclosure safety analyses conducted before operations begin play a major role in the design process, selection of equipment, and development of operational procedures. Because of the complexity, duration, and spatial scales of the operations, analyses are conducted using mathematical models implemented in computer codes

  3. Evaluation of repository safety

    International Nuclear Information System (INIS)

    Sagar, B.; Patrick, W.; Dasgupta, B.; Mohanty, S.

    2002-01-01

    The United States high-level waste program requires evaluation of radiological safety during two distinct time intervals. The first interval, commonly referred to as the preclosure period, deals with receipt of waste at the site, transfer into disposal containers, if needed, emplacement in the underground openings, monitoring and maintenance activities, backfill and closure of the underground openings, and decontamination and decommissioning of the surface facilities of the geologic repository. The preclosure period may extend from a few tens of years to as long as a few hundred of years, depending on repository design and societal norms regarding a final decision to permanently seal the repository. During the preclosure or operational period, performance confirmation studies are conducted to provide a basis for updating and reevaluating estimates of postclosure performance and, finally, to provide a basis for a closure decision. The postclosure period during which expected repository performance must meet certain standards may range from ten thousands years, as it does in the United States, to millions of years, as it does in some European nations. Waste handling operations in the preclosure period are to be evaluated in relation to their potential effect on workers, members of general public, and the general environment. During this period, releases of radioactivity are to be monitored and appropriate actions taken whenever established limits are approached or exceeded. Preclosure safety is highly dependent on facility design, operational hardware and automated systems, operational sequences, and reliability of humans involved in operations. Preclosure safety analyses conducted before operations begin play a major role in the design process, selection of equipment, and development of operational procedures. Because of the complexity, duration, and spatial scales of the operations, analyses are conducted using mathematical models implemented in computer codes

  4. National Ignition Facility Project Site Safety Program

    International Nuclear Information System (INIS)

    Dun, C

    2003-01-01

    This Safety Program for the National Ignition Facility (NIF) presents safety protocols and requirements that management and workers shall follow to assure a safe and healthful work environment during activities performed on the NIF Project site. The NIF Project Site Safety Program (NPSSP) requires that activities at the NIF Project site be performed in accordance with the ''LLNL ES and H Manual'' and the augmented set of controls and processes described in this NIF Project Site Safety Program. Specifically, this document: (1) Defines the fundamental NIF site safety philosophy. (2) Defines the areas covered by this safety program (see Appendix B). (3) Identifies management roles and responsibilities. (4) Defines core safety management processes. (5) Identifies NIF site-specific safety requirements. This NPSSP sets forth the responsibilities, requirements, rules, policies, and regulations for workers involved in work activities performed on the NIF Project site. Workers are required to implement measures to create a universal awareness that promotes safe practice at the work site and will achieve NIF management objectives in preventing accidents and illnesses. ES and H requirements are consistent with the ''LLNL ES and H Manual''. This NPSSP and implementing procedures (e.g., Management Walkabout, special work procedures, etc.,) are a comprehensive safety program that applies to NIF workers on the NIF Project site. The NIF Project site includes the B581/B681 site and support areas shown in Appendix B

  5. Development and evaluation of the scientific fundamentals for safety analysis of an ultimate storage site in the period after operation

    International Nuclear Information System (INIS)

    Brewitz, W.; Buhmann, D.; Fein, E.; Hirsekorn, R.P.; Kuehle, T.; Noseck, U.; Storck, R.; Tix, C.

    1996-09-01

    The project comprised the analysis and evaluation of scientific results of national and international studies which must be considered in model assumptions and model data of long-term safety analyses. This was done with a view to the planning of future projects in close cooperation with the leaders of the BMBF Waste Management Project. Priority was given to models and data on the following subjects: Convergence characteristics of saline rock; behaviour of stowing and sealing materials; Leaching of cemented waste; Chemical environment in the vicinity; Sorption in the overlying rock strata; Systematics of scenario analyses. (orig./DG) [de

  6. Site independent considerations on safety and protection of the groundwater - Basis for the fundamental evaluation of the licence granting for the surface buildings of a geological repository

    International Nuclear Information System (INIS)

    2013-08-01

    This report explains how the protection of man and the environment can be assured for the surface facility of a deep geological repository. The report is intended primarily for the federal authorities, but also provides important information for the siting Cantons and siting regions. Nagra has also prepared an easily understandable brochure on the topic for the general public. The report was prepared at the request of the Swiss Federal Office of Energy (SFOE), with the aim of allowing the responsible federal authorities to evaluate, in a general manner, the aspects of safety and groundwater protection during the construction and operation of the surface facility of a geological repository, and the ability of the facility to fulfill the licensing requirements. The information is based on preliminary design concepts. The report presents the main features of a surface facility (design, activities), taking into account the waste to be emplaced in the repository and the potential conditions at the site. It is not a formal safety report for a facility at a real site within the context of licensing procedures as specified in the nuclear energy legislation. In line with the different legal and regulatory requirements, the following aspects are the subject of a qualitative analysis for the surface facility: (i) Nuclear safety and radiological protection during operation; (ii) Safety with respect to conventional (non-nuclear) accidents during operation and (iii) Protection of the groundwater during the construction and operational phases. The analysis highlights the fundamental requirements relating to the design of the surface facility, the operating procedures and the waste to be emplaced that have to be implemented in order to ensure the safety and protection of the groundwater. The influence of site-specific features and factors on the safety of the surface facility and on a possible impact on groundwater is also considered. To summarise, the report reaches the

  7. General aspects of siting and safety considerations

    International Nuclear Information System (INIS)

    Rutgers, E.

    1980-01-01

    The siting process from site selection to the different stages of review by the regulatory body is described. Special attention is payed to the role and responsibilities of the licensing authority. Next, the basic considerations involved in the siting process are reviewed. They include system planning, engineering, safety, environmental impact (including land use) and economics. Case studies illustrating different aspects of the siting process (e.g. site selection) are presented. (orig.)

  8. Safety Review Services, Site Review Services and IRRS

    International Nuclear Information System (INIS)

    Yllera, Javier

    2010-01-01

    The selection and the evaluation of the site for a nuclear power plant are crucial parts of establishing a nuclear power programme and can be significantly affected by costs, public acceptance and safety considerations. Siting is the process of selecting a suitable site for a facility. This is area containing the plant, defined by a boundary and under effective control of the Plant Management. For safety related issues comparison within topics is generally quite straightforward. For example, sites with relatively higher seismic hazard would be penalized in comparison with those in more stable areas. The site for the NPP is generally chosen at a relatively ‘aseismic’ part of the country. This generally means that well known seismogenic sources are more than at least 50 kms from the site. The proposed sites for nuclear installations shall be examined with respect to the frequency and the severity of natural and human induced events and phenomena that could affect the safety of the installation. The Events unconnected with the operation of a facility or activity which could have an effect on the safety of the facility or activity. The relationship between the site and the design for the nuclear installation shall be examined to ensure that the radiological risk to the public and the environment arising from releases defined by the source terms is acceptably low. The Nuclear Regulatory Authority should issue a document that sets out the technical safety and security criteria against which the Site Permit Application for a new NPP will be reviewed. The objective of the Site Safety Review Services (SSRS) is provided upon request from a Member State. An independent review and assessment of the site and nuclear installation safety in relation to external natural and man induced hazards. This is to make recommendations on additional analysis or plant modifications to be carried out in order to comply with the IAEA Safety Standards and to enhance safety

  9. Safety leadership: application in construction site.

    Science.gov (United States)

    Cooper, Dominic

    2010-01-01

    The extant safety literature suggests that managerial Safety Leadership is vital to the success and maintenance of a behavioral safety process. The current paper explores the role of Managerial Safety Leadership behaviors in the success of a behavioral safety intervention in the Middle-East with 47,000 workers from multiple nationalities employed by fourteen sub-contractors and one main contractor. A quasi-experimental repeating ABABAB, within groups design was used. Measurement focused on managerial Safety Leadership and employee safety behaviors as well as Corrective Actions. Data was collected over 104 weeks. During this time, results show safety behavior improved by 30 percentage points from an average of 65% during baseline to an average of 95%. The site achieved 121 million man-hours free of lost-time injuries on the longest run. Stepwise multiple regression analyses indicated 86% of the variation in employee safety behavior was associated with senior, middle and front-line manager's Safety Leadership behaviors and the Corrective Action Rate. Approximately 38% of the variation in the Total Recordable Incident Rate (TRIR) was associated with the Observation rate, Corrective Action Rate and Observers Records of managerial safety leaders (Visible Ongoing Support). The results strongly suggest manager's Safety Leadership influences the success of Behavioral Safety processes.

  10. Evaluation of reactor safety

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-04-15

    Although the operation of nuclear reactors has a remarkably good record of safety, the prevention of possible reactor accidents is one of the major factors that atomic planners have to contend with. At the same time, excessive caution may breed an attitude that hampers progress, either by resisting new development or by demanding unnecessarily elaborate and expensive precautions out of proportion to the actual hazards involved. The best course obviously is to determine the possible dangers and adopt adequate measures for their prevention, providing of course, for a reasonable margin of error in judging the hazards and the effectiveness of the measures. The greater the expert understanding and thoroughness with which this is done, the narrower need the margin be. This is the basic idea behind the evaluation of reactor safety

  11. PHWR safety: design, siting and construction

    International Nuclear Information System (INIS)

    Sharma, V.K.

    2002-01-01

    In all activities associated with NPPs viz. siting, design, construction, commissioning and operation, safety is given overriding importance. The safety design principles of PHWRs are based on defence-in-depth approach, physical and functional separation between process and safety systems and also among various safety systems, redundancy to meet single failure criteria and postulation of a number of design basis events for which the plant must be designed. Apart from engineered safety systems, PHWRs have inherent characteristics which contribute to safety. In siting of a NPP, it is required to ensure that the given site does not pose undue radiological hazard to public and the environment both during normal operation as well as during and following an accident condition. For this purpose, all site related external events, both natural and man induced, are assessed for their effect on the plant and are considered as part of the design basis. Possible radiological impact of the NPP on environment and surrounding population is assessed and ensured to be within acceptable limits. During construction phase, it is essential that the NPP be built in accordance with design intent and with required quality of workmanship to ensure that the NPP will remain safe during all states of operation. This is achieved through careful execution and QA activities encompassing all aspects of component fabrication at manufacturer works, civil construction, site erection, assembly, and commissioning. Future trends in nuclear safety will continue to be based on existing principles which have proved to be sound. These will be further strengthened by features such as increasing use of passive means of performing safety functions and a more explicit treatment of severe accidents. (author)

  12. A study for the safety evaluation of geological disposal of TRU waste and influence on disposal site design by change of amount of TRU waste (Joint research)

    International Nuclear Information System (INIS)

    Hasegawa, Makoto; Kondo, Hitoshi; Takahashi, Kuniaki; Funabashi, Hideaki; Kawatsuma, Shinji; Kamei, Gento; Hirano, Fumio; Mihara, Morihiro; Ueda, Hiroyoshi; Ohi, Takao; Hyodo, Hideaki

    2011-02-01

    In the safety evaluation of the geological disposal of the TRU waste, it is extremely important to share the information with the Research and development organization (JAEA: that is also the waste generator) by the waste disposal entrepreneur (NUMO). In 2009, NUMO and JAEA set up a technical commission to investigate the reasonable TRU waste disposal following a cooperation agreement between these two organizations. In this report, the calculation result of radionuclide transport for a TRU waste geological disposal system was described, by using the Tiger code and the GoldSim code at identical terms. Tiger code is developed to calculate a more realistic performance assessment by JAEA. On the other hand, GoldSim code is the general simulation software that is used for the computation modeling of NUMO TRU disposal site. Comparing the calculation result, a big difference was not seen. Therefore, the reliability of both codes was able to be confirmed. Moreover, the influence on the disposal site design (Capacity: 19,000m 3 ) was examined when 10% of the amount of TRU waste increased. As a result, it was confirmed that the influence of the site design was very little based on the concept of the Second Progress Report on Research and Development for TRU Waste Disposal in Japan. (author)

  13. Review of decision methodologies for evaluating regulatory actions affecting public health and safety. [Nuclear industry site selection

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, P.L.; McDonald, C.L.; Schilling, A.H.

    1976-12-01

    This report examines several aspects of the problems and choices facing the governmental decision maker who must take regulatory actions with multiple decision objectives and attributes. Particular attention is given to the problems facing the U.S. Nuclear Regulatory Commission (NRC) and to the decision attribute of chief concern to NRC, the protection of human health and safety, with emphasis on nuclear power plants. The study was undertaken to provide background information for NRC to use in refining its process of value/impact assessment of proposed regulatory actions. The principal conclusion is that approaches to rationally consider the value and impact of proposed regulatory actions are available. These approaches can potentially improve the decision-making process and enable the agency to better explain and defend its decisions. They also permit consistent examination of the impacts, effects of uncertainty and sensitivity to various assumptions of the alternatives being considered. Finally, these approaches can help to assure that affected parties are heard and that technical information is used appropriately and to the extent possible. The principal aspects of the regulatory decision problem covered in the report are: the legal setting for regulatory decisions which affect human health and safety, elements of the decision-making process, conceptual approaches to decision making, current approaches to decision making in several Federal agencies, and the determination of acceptable risk levels.

  14. Safety significance evaluation system

    International Nuclear Information System (INIS)

    Lew, B.S.; Yee, D.; Brewer, W.K.; Quattro, P.J.; Kirby, K.D.

    1991-01-01

    This paper reports that the Pacific Gas and Electric Company (PG and E), in cooperation with ABZ, Incorporated and Science Applications International Corporation (SAIC), investigated the use of artificial intelligence-based programming techniques to assist utility personnel in regulatory compliance problems. The result of this investigation is that artificial intelligence-based programming techniques can successfully be applied to this problem. To demonstrate this, a general methodology was developed and several prototype systems based on this methodology were developed. The prototypes address U.S. Nuclear Regulatory Commission (NRC) event reportability requirements, technical specification compliance based on plant equipment status, and quality assurance assistance. This collection of prototype modules is named the safety significance evaluation system

  15. Preliminary safety analysis of the Gorleben site

    International Nuclear Information System (INIS)

    Bracke, G.; Fischer-Appelt, K.

    2014-01-01

    The safety requirements governing the final disposal of heat-generating radioactive waste in Germany were implemented by the Federal Ministry of Environment, Natural Conservation and Nuclear Safety (BMU) in 2010. The Ministry considers as a fundamental objective the protection of man and the environment against the hazards of radioactive waste. Unreasonable burdens and obligation for future generations shall be avoided. The main safety principles are concentration and inclusion of radioactive and other pollutants in a containment-providing rock zone. Any release of radioactive nuclides may increase the risk for men and the environment only negligibly compared to natural radiation exposure. No intervention or maintenance work shall be necessary in the post-closure phase. Retrieval/recovery of the waste shall be possible up to 500 years after closure. The Gorleben salt dome has been discussed since the 1970's as a possible repository site for heat-generating radioactive waste in Germany. The objective of the project preliminary safety analysis of the Gorleben site (VSG) was to assess if repository concepts at the Gorleben site or other sites with a comparable geology could comply with these requirements based on currently available knowledge (Fischer-Appelt, 2013; Bracke, 2013). In addition to this it was assessed if methodological approaches can be used for a future site selection procedure and which technological and conceptual considerations can be transferred to other geological situations. The objective included the compilation and review of the available exploration data of the Gorleben site and on disposal in salt rock, the development of repository designs, and the identification of the needs for future R and D work and further site investigations. (authors)

  16. Preliminary Site Suitability Evaluation

    International Nuclear Information System (INIS)

    J. L. King

    2001-01-01

    Commercial electric power generation, nuclear weapons production, the operation of naval reactors, and research and development activities produce spent nuclear fuel and high-level radioactive waste. Spent nuclear fuel and high-level radioactive waste have been accumulating at commercial reactor sites and storage facilities across the country since 1957. Spent nuclear fuel and high-level radioactive waste have been accumulating at sites now managed by U.S. Department of Energy (DOE) since the mid-1940s. The DOE has the statutory obligation to dispose of these wastes. The U.S. has studied methods for the safe storage and disposal of radioactive waste for more than 40 years. Many organizations and government agencies have participated in these studies. In the 1950s, the U.S. Atomic Energy Commission requested the National Academy of Sciences to evaluate options for land disposal of radioactive waste. The U.S. Atomic Energy Commission and its successor agencies, the Energy Research and Development Administration and the DOE, continued to analyze radioactive waste management options throughout the 1960s and 1970s. In 1979, an Interagency Review Group that included representatives of 14 federal government entities provided findings and recommendations to the President. After analyzing a range of options, disposal in a geologic repository emerged as the preferred long-term environmental solution. This consensus is reflected in the Nuclear Waste Policy Act of 1982 (NWPA). The NWPA and related statutes established the framework for addressing the issues of radioactive waste disposal and designated the roles and responsibilities of the federal government and the owners and generators of the waste

  17. Site safety plan for Lawrence Livermore National Laboratory CERCLA investigations at site 300. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Kilmer, J.

    1997-08-01

    Various Department of Energy Orders incorporate by reference, health and safety regulations promulgated by the Occupational Safety and Health Administration (OSHA). One of the OSHA regulations, 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, requires that site safety plans are written for activities such as those covered by work plans for Site 300 environmental investigations. Based upon available data, this Site Safety Plan (Plan) for environmental restoration has been prepared specifically for the Lawrence Livermore National Laboratory Site 300, located approximately 15 miles east of Livermore, California. As additional facts, monitoring data, or analytical data on hazards are provided, this Plan may need to be modified. It is the responsibility of the Environmental Restoration Program and Division (ERD) Site Safety Officer (SSO), with the assistance of Hazards Control, to evaluate data which may impact health and safety during these activities and to modify the Plan as appropriate. This Plan is not `cast-in-concrete.` The SSO shall have the authority, with the concurrence of Hazards Control, to institute any change to maintain health and safety protection for workers at Site 300.

  18. Studies on Labour Safety in Construction Sites

    Directory of Open Access Journals (Sweden)

    S. Kanchana

    2015-01-01

    Full Text Available Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites.

  19. Studies on Labour Safety in Construction Sites

    Science.gov (United States)

    Kanchana, S.; Sivaprakash, P.; Joseph, Sebastian

    2015-01-01

    Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites. PMID:26839916

  20. PWR reload safety evaluation methodology

    International Nuclear Information System (INIS)

    Doshi, P.K.; Chapin, D.L.; Love, D.S.

    1993-01-01

    The current practice for WWER safety analysis is to prepare the plant Safety Analysis Report (SAR) for initial plant operation. However, the existing safety analysis is typically not evaluated for reload cycles to confirm that all safety limits are met. In addition, there is no systematic reanalysis or reevaluation of the safety analyses after there have been changes made to the plant. The Westinghouse process is discussed which is in contrast to this and in which the SAR conclusions are re-validated through evaluation and/or analysis of each reload cycle. (Z.S.)

  1. Objectives of safety evaluation

    International Nuclear Information System (INIS)

    Rosen, M.

    1980-01-01

    An examination of the safety aspects of exported nuclear power plants demonstrates that additional and somewhat special considerations exist for these plants. In view of this and the generally small regulatory staffs of importing coutnries, suggestions are given for measures which should be taken by various organizations involved in the export and import of nuclear power facilities to raise the level of the very essential safety assessment. (orig.)

  2. Management of construction safety at RR site

    International Nuclear Information System (INIS)

    Pathak, B.C.; Khatsuriya, J.R.

    2016-01-01

    Construction industries are one of the most hazardous industries and hence, promotion of safety remains one of the greatest challenges facing construction industry today. According to ILO estimates: Each year at least 60,000 fatal accidents occur on construction sites around the world or one fatal accident every ten minutes. One in six fatal accidents at work occurs on a construction site. In industrialized countries, as many as 25-40 per cent of work related deaths occur on construction sites, even though the sector employs only 6-10 per cent of the workforce. The number of fatalities occurring from construction work in India is also quite disturbing. Though, the fall of person from height and through openings were the major causes for fatal /serious accidents, the risk of fatal accident involving material handling equipment, either during handling or its maintenance is also significantly high due to use of large number of material handling equipments during construction work. (author)

  3. Analysis of safety culture components based on site interviews

    International Nuclear Information System (INIS)

    Ueno, Akira; Nagano, Yuko; Matsuura, Shojiro

    2002-01-01

    Safety culture of an organization is influenced by many factors such as employee's moral, safety policy of top management and questioning attitude among site staff. First this paper analyzes key factors of safety culture on the basis of site interviews. Then the paper presents a safety culture composite model and its applicability in various contexts. (author)

  4. Iterative performance assessments as a regulatory tool for evaluating repository safety: How experiences from SKI Project-90 were used in formulating the new performance assessment project SITE-94

    International Nuclear Information System (INIS)

    Andersson, J.

    1993-01-01

    The Swedish Nuclear Power Inspectorate, SKI, regulatory research program has to prepare for the process of licensing a repository for spent nuclear fuel, by building up the necessary knowledge and review capacity. SKIs main strategy for meeting this demand is to develop an independent performance assessment capability. SKIs first own performance assessment project, Project-90, was completed in 1991 and is now followed by a new project, SITE-94. SITE-94 is based on conclusions reached within Project-90. An independent review of Project-90, carried out by a NEA team of experts, has also contributed to the formation of the project. Another important reason for the project is that the implementing organization in Sweden, SKB, has proposed to submit an application to start detailed investigation of a repository candidate site around 1997. SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process, and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This will be addressed by exploring multiple interpretations, conceptual models, and parameters consistent with the site data. The site evaluation will strive for consistency between geological, hydrological, rock mechanical, and geochemical descriptions. Other important elements of SITE-94 are the development of a practical and defensible methodology for defining, constructing and analyzing scenarios, the development of approaches for treatment of uncertainties, evaluation of canister integrity, and the development and application of an appropriate quality assurance plan for performance assessments

  5. Experiment to evaluate software safety

    International Nuclear Information System (INIS)

    Soubies, B.; Henry, J.Y.

    1994-01-01

    The process of licensing nuclear power plants for operation consists of mandatory steps featuring detailed examination of the instrumentation and control system by the safety authorities, including softwares. The criticality of these softwares obliges the manufacturer to develop in accordance with the IEC 880 standard 'Computer software in nuclear power plant safety systems' issued by the International Electronic Commission. The evaluation approach, a two-stage assessment is described in detail. In this context, the IPSN (Institute of Protection and Nuclear Safety), the technical support body of the safety authority uses the MALPAS tool to analyse the quality of the programs. (R.P.). 4 refs

  6. Complementary safety assessment assessment of nuclear facilities - Tricastin facility - AREVA; Evaluation complementaire de la surete des installations nucleaires de base - Site du Tricastin - AREVA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This complementary safety assessment analyses the robustness of the Areva part of the Tricastin nuclear site to extreme situations such as those that led to the Fukushima accident. This study includes the following facilities: Areva NC Pierrelatte, EURODIF production, Comurhex Pierrelatte, Georges Besse II plant and Socatri. Robustness is the ability for the plant to withstand events beyond which the plant was designed. Robustness is linked to safety margins but also to the situations leading to a sudden deterioration of the accidental sequence. Moreover, safety is not only a matter of design or engineered systems but also a matter of organizing: task organization (including subcontracting) as well as the setting of emergency plans or the inventory of nuclear materials are taken into consideration in this assessment. This report is divided into 10 main chapters: 1) the feedback experience of the Fukushima accident; 2) description of the site and its surroundings; 3) featuring of the site's activities and installations; 4) accidental sequences; 5) protection from earthquakes; 6) protection from floods; 7) protection from other extreme natural disasters; 8) the loss of electrical power and of the heat sink; 9) the management of severe accidents; and 10) subcontracting policy. This analysis has identified 5 main measures to be taken to limit the risks linked to natural disasters: -) continuing the program for replacing the current conversion plant and the enrichment plant; -) renewing the storage of hydrofluoric acid at the de-fluorination workshop; -) assessing the seismic behaviour of some parts of the de-fluorination workshop and of the fluorine fabrication workshop; -) improving the availability of warning and information means in case of emergency; and -) improving the means to mitigate accidental gaseous releases. (A.C.)

  7. Groundwater well services site safety and health plan

    International Nuclear Information System (INIS)

    Tuttle, B.G.

    1996-08-01

    This Site Specific Health and Safety Plan covers well servicing in support of the Environmental Restoration Contractor Groundwater Project. Well servicing is an important part of environmental restoration activities supporting several pump and treat facilities and assisting in evaluation and servicing of various groundwater wells throughout the Hanford Site. Remediation of contaminated groundwater is a major part of the ERC project. Well services tasks help enhance groundwater extraction/injection as well as maintain groundwater wells for sampling and other hydrologic testing and information gathering

  8. Safety aspects of geological studies around nuclear installations sites

    International Nuclear Information System (INIS)

    Faure, J.

    1988-01-01

    The experience of geological studies of about forty french nuclear sites allows to set out the objectives, the phases and the geographic extensions of workings to be realized for confirming a site. The data to be collected for the safety analysis are specified; they concern the local and regional geology, the geotechnical characteristics and the essential elements for evaluating the hazards related to the soil liquefaction, the surface fracturing and in some cases the volcanic risks. It is necessary to follow up the geology during the installation construction and life. 8 refs. (F.M.)

  9. Approach of the safety of nuclear sites

    International Nuclear Information System (INIS)

    Faure, J.

    1991-08-01

    The implantation on a site of nuclear power plant, nuclear facility, laboratory or nuclear waste storage, or more generally a risk facility, require to take into account the aggression of the environment on the facility (earth quakes, explosions, inundations, aircraft crash...) and dangers presented by the facility on the environment (radioactive release, noise...). The consequences of releases on the environment aim to study and also the characteristics of the environment to evaluate the consequences in normal and accidental conditions [fr

  10. LNG Safety Assessment Evaluation Methods

    Energy Technology Data Exchange (ETDEWEB)

    Muna, Alice Baca [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); LaFleur, Angela Christine [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-05-01

    Sandia National Laboratories evaluated published safety assessment methods across a variety of industries including Liquefied Natural Gas (LNG), hydrogen, land and marine transportation, as well as the US Department of Defense (DOD). All the methods were evaluated for their potential applicability for use in the LNG railroad application. After reviewing the documents included in this report, as well as others not included because of repetition, the Department of Energy (DOE) Hydrogen Safety Plan Checklist is most suitable to be adapted to the LNG railroad application. This report was developed to survey industries related to rail transportation for methodologies and tools that can be used by the FRA to review and evaluate safety assessments submitted by the railroad industry as a part of their implementation plans for liquefied or compressed natural gas storage ( on-board or tender) and engine fueling delivery systems. The main sections of this report provide an overview of various methods found during this survey. In most cases, the reference document is quoted directly. The final section provides discussion and a recommendation for the most appropriate methodology that will allow efficient and consistent evaluations to be made. The DOE Hydrogen Safety Plan Checklist was then revised to adapt it as a methodology for the Federal Railroad Administration’s use in evaluating safety plans submitted by the railroad industry.

  11. Area 5 Radioactive Waste Management Site Safety Assessment Document

    International Nuclear Information System (INIS)

    Horton, K.K.; Kendall, E.W.; Brown, J.J.

    1980-02-01

    The Area 5 Radioactive Waste Management Safety Assessment Document evaluates site characteristics, facilities and operating practices which contribute to the safe handling and storage/disposal of radioactive wastes at the Nevada Test Site. Physical geography, cultural factors, climate and meteorology, geology, hydrology (with emphasis on radionuclide migration), ecology, natural phenomena, and natural resources are discussed and determined to be suitable for effective containment of radionuclides. Also considered, as a separate section, are facilities and operating practices such as monitoring; storage/disposal criteria; site maintenance, equipment, and support; transportation and waste handling; and others which are adequate for the safe handling and storage/disposal of radioactive wastes. In conclusion, the Area 5 Radioactive Waste Management Site is suitable for radioactive waste handling and storage/disposal for a maximum of twenty more years at the present rate of utilization

  12. Code on the safety of nuclear power plants: Siting

    International Nuclear Information System (INIS)

    1988-01-01

    This Code provides criteria and procedures that are recommended for safety in nuclear power plant siting. It forms part of the Agency's programme for establishing Codes and Safety Guides relating to land based stationary thermal neutron power plants

  13. Safety assessment for Area 5 radioactive-waste-management site

    International Nuclear Information System (INIS)

    Hunter, P.H.; Card, D.H.; Horton, K.

    1982-09-01

    The Area 5 Radioactive Waste Management Safety Assessment Document contains evaluations of site characteristics, facilities, and operating practices that contribute to the safe handling, storage, and disposal of low-level radioactive wastes at the Nevada Test Site. Physical geography, cultural factors, climate and meteorology, geology, hydrology (with emphasis on radionuclide migration), ecology, natural phenomena, and natural resources are discussed and determined to be suitable for effective containment of radionuclides. A separate section considers facilities and operating practices such as monitoring, storage/disposal criteria, site maintenance, equipment, and support. The section also considers the transportation and waste handling requirements supporting the new Greater Confinement Disposal Facility (GCDF), GCDF demonstration project, and other requirements for the safe handling, storage, and disposal of low-level radioactive wastes. Finally, the document provides an analysis of releases and an assessment of the near-term operational impacts and dose commitments to operating personnel and the general public from normal operations and anticipated accidental occurrences. The conclusion of this report is that the Area 5 Radioactive Waste Management Site is suitable for low-level radioactive waste handling, storage, and disposal. Also, the new GCDF demonstration project will not affect the overall safety of the Area 5 Radioactive Waste Management Site

  14. Administrative goals and safety standards for hazard control on forested recreation sites

    Science.gov (United States)

    Lee A. Paine

    1973-01-01

    For efficient control of tree hazard on recreation sites, a specific administrative goal must be selected. A safety standard designed to achieve the selected goal and a uniform hazard-rating procedure will then promote a consistent level of safety at an acceptable cost. Safety standards can be established with the aid of data for past years, and dollar evaluations are...

  15. Site safety requirements for high level waste disposal

    International Nuclear Information System (INIS)

    Chen Weiming; Wang Ju

    2006-01-01

    This paper outlines the content, status and trend of site safety requirements of International Atomic Energy Agency, America, France, Sweden, Finland and Japan. Site safety requirements are usually represented as advantageous vis-a-vis disadvantagous conditions, and potential advantage vis-a-vis disadvantage conditions, respectively in aspects of geohydrology, geochemistry, lithology, climate and human intrusion etc. Study framework and steps of site safety requirements for China are discussed under the view of systems science. (authors)

  16. SafetyAnalyst : software tools for safety management of specific highway sites

    Science.gov (United States)

    2010-07-01

    SafetyAnalyst provides a set of software tools for use by state and local highway agencies for highway safety management. SafetyAnalyst can be used by highway agencies to improve their programming of site-specific highway safety improvements. SafetyA...

  17. Association of Safety Culture with Surgical Site Infection Outcomes.

    Science.gov (United States)

    Fan, Caleb J; Pawlik, Timothy M; Daniels, Tania; Vernon, Nora; Banks, Katie; Westby, Peggy; Wick, Elizabeth C; Sexton, J Bryan; Makary, Martin A

    2016-02-01

    Hospital workplace culture may have an impact on surgical outcomes; however, this association has not been established. We designed a study to evaluate the association between safety culture and surgical site infection (SSI). Using the Hospital Survey on Patient Safety Culture and National Healthcare Safety Network definitions, we measured 12 dimensions of safety culture and colon SSI rates, respectively, in the surgical units of Minnesota community hospitals. A Pearson's r correlation was calculated for each of 12 dimensions of surgical unit safety culture and SSI rate and then adjusted for surgical volume and American Society of Anesthesiologists (ASA) classification. Seven hospitals participated in the study, with a mean survey response rate of 43%. The SSI rates ranged from 0% to 30%, and surgical unit safety culture scores ranged from 16 to 92 on a scale of 0 to 100. Ten dimensions of surgical unit safety culture were associated with colon SSI rates: teamwork across units (r = -0.96; 95% CI [-0.76, -0.99]), organizational learning (r = -0.95; 95% CI [-0.71, -0.99]), feedback and communication about error (r = -0.92; 95% CI [-0.56, -0.99]), overall perceptions of safety (r = -0.90; 95% CI [-0.45, -0.99]), management support for patient safety (r = -0.90; 95% CI [-0.44, -0.98]), teamwork within units (r = -0.88; 95% CI [-0.38, -0.98]), communication openness (r = -0.85; 95% CI [-0.26, -0.98]), supervisor/manager expectations and actions promoting safety (r = -0.85; 95% CI [-0.25, -0.98]), non-punitive response to error (r = -0.78; 95% CI [-0.07, -0.97]), and frequency of events reported (r = -0.76; 95% CI [-0.01, -0.96]). After adjusting for surgical volume and ASA classification, 9 of 12 dimensions of surgical unit safety culture were significantly associated with lower colon SSI rates. These data suggest an important role for positive safety and teamwork culture and engaged hospital management in producing high-quality surgical

  18. Safety in nuclear power plant siting. A code of practice

    International Nuclear Information System (INIS)

    1978-01-01

    This publication is brought out within the framework of establishing Codes of Practice and Safety Guides for nuclear power plants: NUSS programme. The scope of the document encompasses site and site-plant interaction factors related to operational states and accident conditions. The purpose of the Code is to give criteria and procedures to be applied as appropriate to operational states and accident conditions, including those which could lead to emergency situations. This Code is mainly concerned with severe events of low probability which relate to the siting of nuclear power plants and have to be considered in designing a particular nuclear power plant. Annex: Examples of natural and man-made events relevant for design basis evaluation

  19. Management of construction safety at KKNPP site

    International Nuclear Information System (INIS)

    Khare, P.K.

    2016-01-01

    Construction is considered as one of the most hazardous activities owing to the number of accidents and injuries. At KKNPP, management of industrial safety has been envisaged since the preliminary stage of construction planning, including design aspects. The governing principles of safety management are evolved from the Factories Act, 1948, the Atomic Energy(Factories) Rules, 1996, AERB safety guidelines on Control of works (2011) and Corporate HSE policy of NPCIL (2014). Numerous risk assessment and hazard control measures are adopted consistently to ensure a safe work environment during the construction, which includes Job Hazard Analysis, work permit through Computerized Maintenance Management System, safety procedures, exclusive safety training facility for the contractor's workmen, safety motivational measures, safety surveillance and reporting through Safety Related Deficiencies Management System. Assessment of efficacy of safety management system is continuously done through safety audits and observations are being circulated and discussed in committee meetings. Fire safety is also being taken care of since inception of project work. Well-equipped fire station with trained fire fighters was made available since the beginning as per AERB safety standard on fire protection system for Nuclear facilities. Fire prevention measures specific to the work are implemented during all activities. (author)

  20. Radionuclide transport report for the safety assessment SR-Site

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    This document compiles radionuclide transport calculations of a KBS-3 repository for the safety assessment SR-Site. The SR-Site assessment supports the licence application for a final repository at Forsmark, Sweden

  1. Methodology for calculating guideline concentrations for safety shot sites

    International Nuclear Information System (INIS)

    1997-06-01

    Residual plutonium (Pu), with trace quantities of depleted uranium (DU) or weapons grade uranium (WU), exists in surficial soils at the Nevada Test Site (NTS), Nellis Air Force Range (NAFR), and the Tonopah Test Range (TTR) as the result of the above-ground testing of nuclear weapons and special experiments involving the detonation of plutonium-bearing devices. The special experiments (referred to as safety shots) involving plutonium-bearing devices were conducted to study the behavior of Pu as it was being explosively compressed; ensure that the accidental detonation of the chemical explosive in a production weapon would not result in criticality; evaluate the ability of personnel to manage large-scale Pu dispersal accidents; and develop criteria for transportation and storage of nuclear weapons. These sites do not pose a health threat to either workers or the general public because they are under active institutional control. The DOE is committed to remediating the safety shot sites so that radiation exposure to the public, both now and in the future, will be maintained within the established limits and be as low as reasonably achievable. Remediation requires calculation of a guideline concentration for the Pu, U, and their decay products that are present in the surface soil. This document presents the methodology for calculating guideline concentrations of weapons grade plutonium, weapons grade uranium, and depleted uranium in surface soils at the safety shot sites. Emphasis is placed on obtaining site-specific data for use in calculating dose to potential residents from the residual soil contamination

  2. Methodology for calculating guideline concentrations for safety shot sites

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    Residual plutonium (Pu), with trace quantities of depleted uranium (DU) or weapons grade uranium (WU), exists in surficial soils at the Nevada Test Site (NTS), Nellis Air Force Range (NAFR), and the Tonopah Test Range (TTR) as the result of the above-ground testing of nuclear weapons and special experiments involving the detonation of plutonium-bearing devices. The special experiments (referred to as safety shots) involving plutonium-bearing devices were conducted to study the behavior of Pu as it was being explosively compressed; ensure that the accidental detonation of the chemical explosive in a production weapon would not result in criticality; evaluate the ability of personnel to manage large-scale Pu dispersal accidents; and develop criteria for transportation and storage of nuclear weapons. These sites do not pose a health threat to either workers or the general public because they are under active institutional control. The DOE is committed to remediating the safety shot sites so that radiation exposure to the public, both now and in the future, will be maintained within the established limits and be as low as reasonably achievable. Remediation requires calculation of a guideline concentration for the Pu, U, and their decay products that are present in the surface soil. This document presents the methodology for calculating guideline concentrations of weapons grade plutonium, weapons grade uranium, and depleted uranium in surface soils at the safety shot sites. Emphasis is placed on obtaining site-specific data for use in calculating dose to potential residents from the residual soil contamination.

  3. Development of Onsite Transportation Safety Documents for Nevada Test Site

    International Nuclear Information System (INIS)

    Frank Hand; Willard Thomas; Frank Sciacca; Manny Negrete; Susan Kelley

    2008-01-01

    Department of Energy (DOE) Orders require each DOE site to develop onsite transportation safety documents (OTSDs). The Nevada Test Site approach divided all onsite transfers into two groups with each group covered by a standalone OTSD identified as Non-Nuclear and Nuclear. The Non-Nuclear transfers involve all radioactive hazardous material in less than Hazard Category (HC)-3 quantities and all chemically hazardous materials. The Nuclear transfers involve all radioactive material equal to or greater than HC-3 quantities and radioactive material mated with high explosives regardless of quantity. Both OTSDs comply with DOE O 460.1B requirements. The Nuclear OTSD also complies with DOE O 461.1A requirements and includes a DOE-STD-3009 approach to hazard analysis (HA) and accident analysis as needed. All Nuclear OTSD proposed transfers were determined to be non-equivalent and a methodology was developed to determine if 'equivalent safety' to a fully compliant Department of Transportation (DOT) transfer was achieved. For each HA scenario, three hypothetical transfers were evaluated: a DOT-compliant, uncontrolled, and controlled transfer. Equivalent safety is demonstrated when the risk level for each controlled transfer is equal to or less than the corresponding DOT-compliant transfer risk level. In this comparison the typical DOE-STD-3009 risk matrix was modified to reflect transportation requirements. Design basis conditions (DBCs) were developed for each non-equivalent transfer. Initial DBCs were based solely upon the amount of material present. Route-, transfer-, and site-specific conditions were evaluated and the initial DBCs revised as needed. Final DBCs were evaluated for each transfer's packaging and its contents

  4. Global positioning site environment evaluator

    International Nuclear Information System (INIS)

    Leffler, S.; Reeser, H.G.; Zaker, E.; Hansen, W.; Sikorski, R.W.

    1990-01-01

    Development of an innovative, integrated, automated system (Global Positioning Site Environment Evaluator - GPSEETM) for surveying contaminated waste sites is described. This system makes novel use of the Global Positioning System (GPS) satellite constellation for establishing specific locations and current times for surveying radioactive, hazardous, or mixed-waste sites. GPSEE may also be used for waste site contamination surveys after remediation activities to ensure environmental remediation is complete. A base station is established for collecting and recording data and directing field operations for field stations which may be located many miles from the base station. The field operators collect site surveying and contamination data utilizing a variety of chemical and radiological sensors. A major goal for the data collection process is to collect all data utilizing in situ sensors, thereby minimizing the need for collecting soil and water samples. Site contamination data is transmitted electronically to the base station for recording and processing. The GPSEE system is being developed for use at DOE/DOD and a variety of industrial facilities. 3 figs

  5. Safety evaluation of food flavorings

    International Nuclear Information System (INIS)

    Schrankel, Kenneth R.

    2004-01-01

    Food flavorings are an essential element in foods. Flavorings are a unique class of food ingredients and excluded from the legislative definition of a food additive because they are regulated by flavor legislation and not food additive legislation. Flavoring ingredients naturally present in foods, have simple chemical structures, low toxicity, and are used in very low levels in foods and beverages resulting in very low levels of human exposure or consumption. Today, the overwhelming regulatory trend is a positive list of flavoring substances, e.g. substances not listed are prohibited. Flavoring substances are added to the list following a safety evaluation based on the conditions of intended use by qualified experts. The basic principles for assessing the safety of flavoring ingredients will be discussed with emphasis on the safety evaluation of flavoring ingredients by the Food and Agriculture Organization (FAO) and World Health Organization (WHO) Joint Expert Committee on Food Additives (JECFA) and the US Flavor and Extract Manufacturers Expert Panel (FEXPAN). The main components of the JECFA evaluation process include chemical structure, human intake (exposure), metabolism to innocuous or harmless substances, and toxicity concerns consistent with JECFA principles. The Flavor and Extract Manufacturers Association (FEMA) evaluation is very similar to the JECFA procedure. Both the JECFA and FEMA evaluation procedures are widely recognized and the results are accepted by many countries. This implies that there is no need for developing countries to conduct their own toxicological assessment of flavoring ingredients unless it is an unique ingredient in one country, but it is helpful to survey intake or exposure assessment. The global safety program established by the International Organization of Flavor Industry (IOFI) resulting in one worldwide open positive list of flavoring substances will be reviewed

  6. Geosphere process report for the safety assessment SR-Site

    International Nuclear Information System (INIS)

    Skagius, Kristina

    2010-11-01

    This report documents geosphere processes identified as relevant to the long-term safety of a KBS-3 repository, and forms an important part of the reporting of the safety assessment SR-Site. The detailed assessment methodology, including the role of the process reports in the assessment, is described in the SR-Site Main report /SKB 2011/

  7. Geosphere process report for the safety assessment SR-Site

    Energy Technology Data Exchange (ETDEWEB)

    Skagius, Kristina (ed.) (Kemakta Konsult AB, Stockholm (Sweden))

    2010-11-15

    This report documents geosphere processes identified as relevant to the long-term safety of a KBS-3 repository, and forms an important part of the reporting of the safety assessment SR-Site. The detailed assessment methodology, including the role of the process reports in the assessment, is described in the SR-Site Main report /SKB 2011/

  8. Evaluation of periodic safety status analyses

    International Nuclear Information System (INIS)

    Faber, C.; Staub, G.

    1997-01-01

    In order to carry out the evaluation of safety status analyses by the safety assessor within the periodical safety reviews of nuclear power plants safety goal oriented requirements have been formulated together with complementary evaluation criteria. Their application in an inter-disciplinary coopertion covering the subject areas involved facilitates a complete safety goal oriented assessment of the plant status. The procedure is outlined briefly by an example for the safety goal 'reactivity control' for BWRs. (orig.) [de

  9. Hanford Site Wide Transportation Safety Document [SEC 1 Thru 3

    Energy Technology Data Exchange (ETDEWEB)

    MCCALL, D L

    2002-06-01

    This safety evaluation report (SER) documents the basis for the US Department of Energy (DOE), Richland Operations Office (RL) to approve the Hanford Sitewide Transportation Safety Document (TSD) for onsite Transportation and Packaging (T&P) at Hanford. Hanford contractors, on behalf of DOE-RL, prepared and submitted the Hanford Sitewide Transportation Safety Document, DOE/RL-2001-0036, Revision 0, (DOE/RL 2001), dated October 4, 2001, which is referred to throughout this report as the TSD. In the context of the TSD, Hanford onsite shipments are the activities of moving hazardous materials, substances, and wastes between DOE facilities and over roadways where public access is controlled or restricted and includes intra-area and inter-area movements. The TSD sets forth requirements and standards for onsite shipment of radioactive and hazardous materials and wastes within the confines of the Hanford Site on roadways where public access is restricted by signs, barricades, fences, or other means including road closures and moving convoys controlled by Hanford Site security forces.

  10. Replacement cross-site transfer system project W-058 safety class upgrade summary report

    International Nuclear Information System (INIS)

    Schlosser, R.L.

    1998-01-01

    This report evaluates the design of the replacement cross-site transfer system structures, systems, and components for safety related applications as defined in the Tank Waste Remediation Systems Basis for Interim Operations

  11. Independent criticality safety evaluation of deposits in cooler equipment in Building K-31 at the Oak Ridge K-25 Site, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-10-01

    This report provides an independent assessment of nuclear criticality issues associated with uranium deposits in the West and East Coolers for the 6A Booster Station in Building K-31 at the Oak Ridge K-25 Site. This assessment investigates the applicability of the initial assumptions used by Lockheed Martin Energy Systems (Energy Systems) and evaluates criticality calculations previously completed by Energy Systems. The calculations were independently verified. Each component was evaluated for its ability to satisfy requirements for subcriticality and meet the double contingency principle. Facility walk downs, detailed neutronics analysis, and fault tree analysis (FTA) were performed. The facility walk downs provided a better understanding of the building condition and status, equipment configuration, and uranium deposit locations. The detailed neutronics analysis focused on system geometry and moderation levels applicable to the individual components. The FTA considered the annual rate of occurrence for the events identified as potential causes of criticality issues. This report also examines the advantages of using this type of evaluation to assess the removal process for additional components and equipment

  12. Geoscientific evaluation factors and criteria for siting and site evaluation. Progress report

    International Nuclear Information System (INIS)

    Stroem, A.; Ericsson, Lars O.; Svemar, C.; Almen, K.E.; Andersson, Johan

    1999-03-01

    The purposes of the present report are to: present the work that has been done to identify the parameters that need to be determined in a geoscientific site investigation and that serve as the basis for the work with geoscientific evaluation factors; give a progress report from the project that was initiated in 1997 named Siting Factors and Criteria for Site Evaluation, with an emphasis on definitions, outline and structure for the execution of the work; present geoscientific requirements on function both general and in detail in the form of an example for the discipline rock mechanics; present geoscientific evaluation factors associated with different stages in the siting work in the form of an example for the discipline hydrogeochemical composition; present plans for further work as regards criteria for site evaluation in different siting stages. The project is under way, and this is to be regarded as a progress report since e.g. criteria for site evaluation will be presented at a later date. The long-term performance and safety of the deep repository must always be evaluated by means of an integrated safety assessment. The work with factors and criteria can never take the place of such an assessment, but can provide guidance regarding its outcome. Requirements and preferences regarding the function of the rock in the deep repository have been clarified in this progress report. What is new here is the structuring that has been carried out, with a classification into different geoscientific disciplines, and the formalism that has been given to the terms requirement, preference and function. Based on fundamental safety and construction functions, requirements on function have been specified for the disciplines geology, thermal properties, hydro-geology, rock mechanics, chemistry and transport properties. Furthermore, function analyses have been identified by means of which it is possible to concretize requirements on function and which geoscientific parameters are

  13. Geoscientific evaluation factors and criteria for siting and site evaluation. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    Stroem, A.; Ericsson, Lars O.; Svemar, C. [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden); Almen, K.E. [KEA GEO-konsult AB (Sweden); Andersson, Johan [Golder Grundteknik KB (Sweden)

    1999-03-01

    The purposes of the present report are to: present the work that has been done to identify the parameters that need to be determined in a geoscientific site investigation and that serve as the basis for the work with geoscientific evaluation factors; give a progress report from the project that was initiated in 1997 named Siting Factors and Criteria for Site Evaluation, with an emphasis on definitions, outline and structure for the execution of the work; present geoscientific requirements on function both general and in detail in the form of an example for the discipline rock mechanics; present geoscientific evaluation factors associated with different stages in the siting work in the form of an example for the discipline hydrogeochemical composition; present plans for further work as regards criteria for site evaluation in different siting stages. The project is under way, and this is to be regarded as a progress report since e.g. criteria for site evaluation will be presented at a later date. The long-term performance and safety of the deep repository must always be evaluated by means of an integrated safety assessment. The work with factors and criteria can never take the place of such an assessment, but can provide guidance regarding its outcome. Requirements and preferences regarding the function of the rock in the deep repository have been clarified in this progress report. What is new here is the structuring that has been carried out, with a classification into different geoscientific disciplines, and the formalism that has been given to the terms requirement, preference and function. Based on fundamental safety and construction functions, requirements on function have been specified for the disciplines geology, thermal properties, hydro-geology, rock mechanics, chemistry and transport properties. Furthermore, function analyses have been identified by means of which it is possible to concretize requirements on function and which geoscientific parameters are

  14. Safety Oversight of Decommissioning Activities at DOE Nuclear Sites

    International Nuclear Information System (INIS)

    Zull, Lawrence M.; Yeniscavich, William

    2008-01-01

    The Defense Nuclear Facilities Safety Board (Board) is an independent federal agency established by Congress in 1988 to provide nuclear safety oversight of activities at U.S. Department of Energy (DOE) defense nuclear facilities. The activities under the Board's jurisdiction include the design, construction, startup, operation, and decommissioning of defense nuclear facilities at DOE sites. This paper reviews the Board's safety oversight of decommissioning activities at DOE sites, identifies the safety problems observed, and discusses Board initiatives to improve the safety of decommissioning activities at DOE sites. The decommissioning of former defense nuclear facilities has reduced the risk of radioactive material contamination and exposure to the public and site workers. In general, efforts to perform decommissioning work at DOE defense nuclear sites have been successful, and contractors performing decommissioning work have a good safety record. Decommissioning activities have recently been completed at sites identified for closure, including the Rocky Flats Environmental Technology Site, the Fernald Closure Project, and the Miamisburg Closure Project (the Mound site). The Rocky Flats and Fernald sites, which produced plutonium parts and uranium materials for defense needs (respectively), have been turned into wildlife refuges. The Mound site, which performed R and D activities on nuclear materials, has been converted into an industrial and technology park called the Mound Advanced Technology Center. The DOE Office of Legacy Management is responsible for the long term stewardship of these former EM sites. The Board has reviewed many decommissioning activities, and noted that there are valuable lessons learned that can benefit both DOE and the contractor. As part of its ongoing safety oversight responsibilities, the Board and its staff will continue to review the safety of DOE and contractor decommissioning activities at DOE defense nuclear sites

  15. Flamanville 3 EPR, Safety Assessment and On-site Inspections

    International Nuclear Information System (INIS)

    Piedagnel, Corinne; Tarallo, Francois; Monnot, Bernard

    2011-01-01

    As a Technical Support Organisation of the French Safety Authority (ASN), the IRSN carries out the safety assessment of EPR project design and participates in the ASN inspections performed at the construction site and in factories. The design assessment consists in defining the safety functions which should be ensured by civil structures, evaluating the EPR Technical Code for Civil works (ETC-C) in which EdF has defined design criteria and construction rules, and carrying out a detailed assessment of a selection of safety-related structures. Those detailed assessments do not consist of a technical control but of an analysis whose objectives are to ensure that design and demonstrations are robust, in accordance with safety and regulatory rules. Most assessments led IRSN to ask EdF to provide additional justification sometimes involving significant modifications. In the light of those complementary justifications and modifications, IRSN concluded that assessments carried out on design studies were globally satisfactory. The participation of IRSN to the on-site inspections led by ASN is a part of the global control of the compliance of the reactor with its safety objectives. For that purpose IRSN has defined a methodology and an inspection program intended to ASN: based on safety functions associated with civil works (confinement and resistance to aggressions), the corresponding behaviour requirements are identified and linked to a list of main civil works elements. During the inspections, deviations to the project's technical specifications or to the rules of the art were pointed out by IRSN. Those deviations cover various items, such as concrete fabrication, concrete pouring methodology, lack of reinforcement in some structures, unadapted welding procedures of the containment leak-tight steel liner and unsatisfactory treatment of concreting joints. The analysis of those problems has revealed flaws in the organisation of the contractors teams together with an

  16. Safety climate and attitude as evaluation measures of organizational safety.

    Science.gov (United States)

    Isla Díaz, R; Díaz Cabrera, D

    1997-09-01

    The main aim of this research is to develop a set of evaluation measures for safety attitudes and safety climate. Specifically it is intended: (a) to test the instruments; (b) to identify the essential dimensions of the safety climate in the airport ground handling companies; (c) to assess the quality of the differences in the safety climate for each company and its relation to the accident rate; (d) to analyse the relationship between attitudes and safety climate; and (e) to evaluate the influences of situational and personal factors on both safety climate and attitude. The study sample consisted of 166 subjects from three airport companies. Specifically, this research was centered on ground handling departments. The factor analysis of the safety climate instrument resulted in six factors which explained 69.8% of the total variance. We found significant differences in safety attitudes and climate in relation to type of enterprise.

  17. Evaluation of vibratory ground motion at nuclear power plant sites

    International Nuclear Information System (INIS)

    Hofmann, R.B.; Greeves, J.T.

    1978-01-01

    The evaluation of vibratory ground motion at nuclear power plant sites requires the cooperative effort of scientists and engineers in several disciplines. These include seismology, geology, geotechnical engineering and structural engineering. The Geosciences Branch of the NRC Division of Site Safety and Environmental Analysis includes two sections, the Geology/Seismology Section and the Geotechnical Engineering Section

  18. Safety evaluation for packaging (onsite) SERF cask

    International Nuclear Information System (INIS)

    Edwards, W.S.

    1997-01-01

    This safety evaluation for packaging (SEP) documents the ability of the Special Environmental Radiometallurgy Facility (SERF) Cask to meet the requirements of WHC-CM-2-14, Hazardous Material Packaging and Shipping, for transfer of Type B quantities (up to highway route controlled quantities) of radioactive material within the 300 Area of the Hanford Site. This document shall be used to ensure that loading, tie down, transport, and unloading of the SERF Cask are performed in accordance with WHC-CM-2-14. This SEP is valid until October 1, 1999. After this date, an update or upgrade to this document is required

  19. The International Criticality Safety Benchmark Evaluation Project on the Internet

    International Nuclear Information System (INIS)

    Briggs, J.B.; Brennan, S.A.; Scott, L.

    2000-01-01

    The International Criticality Safety Benchmark Evaluation Project (ICSBEP) was initiated in October 1992 by the US Department of Energy's (DOE's) defense programs and is documented in the Transactions of numerous American Nuclear Society and International Criticality Safety Conferences. The work of the ICSBEP is documented as an Organization for Economic Cooperation and Development (OECD) handbook, International Handbook of Evaluated Criticality Safety Benchmark Experiments. The ICSBEP Internet site was established in 1996 and its address is http://icsbep.inel.gov/icsbep. A copy of the ICSBEP home page is shown in Fig. 1. The ICSBEP Internet site contains the five primary links. Internal sublinks to other relevant sites are also provided within the ICSBEP Internet site. A brief description of each of the five primary ICSBEP Internet site links is given

  20. Evolution of Safety Basis Documentation for the Fernald Site

    International Nuclear Information System (INIS)

    Brown, T.; Kohler, S.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    The objective of the Department of Energy's (DOE) Fernald Closure Project (FCP), in suburban Cincinnati, Ohio, is to safely complete the environmental restoration of the Fernald site by 2006. Over 200 out of 220 total structures, at this DOE plant site which processed uranium ore concentrates into high-purity uranium metal products, have been safely demolished, including eight of the nine major production plants. Documented Safety Analyses (DSAs) for these facilities have gone through a process of simplification, from individual operating Safety Analysis Reports (SARs) to a single site-wide Authorization Basis containing nuclear facility Bases for Interim Operations (BIOs) to individual project Auditable Safety Records (ASRs). The final stage in DSA simplification consists of project-specific Integrated Health and Safety Plans (I-HASPs) and Nuclear Health and Safety Plans (N-HASPs) that address all aspects of safety, from the worker in the field to the safety basis requirements preserving the facility/activity hazard categorization. This paper addresses the evolution of Safety Basis Documentation (SBD), as DSAs, from production through site closure

  1. The evaluation of site characteristics for Guangdong nuclear power plant

    International Nuclear Information System (INIS)

    Zhou Ruming; Wu Dizhong; Yan Zhongmin

    1987-01-01

    This paper gives an account of the features of the site of Guangdong Nuclear Power Plant (GNPP) in general and in particular evaluates the outstanding site characteristics related to nuclear safety and public health. It is composed of two parts: the first part describes the seismo-geologic conditions of the site and the other treats the atmospheric dispersion conditions. It also contains the discussion why the possibility of inhabitancy within 5 km from the exclusion ares boundary would not be affected. (author)

  2. Improving construction site safety through leader-based verbal safety communication.

    Science.gov (United States)

    Kines, Pete; Andersen, Lars P S; Spangenberg, Soren; Mikkelsen, Kim L; Dyreborg, Johnny; Zohar, Dov

    2010-10-01

    The construction industry is one of the most injury-prone industries, in which production is usually prioritized over safety in daily on-site communication. Workers have an informal and oral culture of risk, in which safety is rarely openly expressed. This paper tests the effect of increasing leader-based on-site verbal safety communication on the level of safety and safety climate at construction sites. A pre-post intervention-control design with five construction work gangs is carried out. Foremen in two intervention groups are coached and given bi-weekly feedback about their daily verbal safety communications with their workers. Foremen-worker verbal safety exchanges (experience sampling method, n=1,693 interviews), construction site safety level (correct vs. incorrect, n=22,077 single observations), and safety climate (seven dimensions, n=105 questionnaires) are measured over a period of up to 42 weeks. Baseline measurements in the two intervention and three control groups reveal that foremen speak with their workers several times a day. Workers perceive safety as part of their verbal communication with their foremen in only 6-16% of exchanges, and the levels of safety at the sites range from 70-87% (correct observations). Measurements from baseline to follow-up in the two intervention groups reveal that safety communication between foremen and workers increases significantly in one of the groups (factor 7.1 increase), and a significant yet smaller increase is found when the two intervention groups are combined (factor 4.6). Significant increases in the level of safety are seen in both intervention groups (7% and 12% increases, respectively), particularly in regards to 'access ways' and 'railings and coverings' (39% and 84% increases, respectively). Increases in safety climate are seen in only one of the intervention groups with respect to their 'attention to safety.' No significant trend changes are seen in the three control groups on any of the three measures

  3. Behavior-based safety on construction sites: a case study.

    Science.gov (United States)

    Choudhry, Rafiq M

    2014-09-01

    This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in

  4. Criticality safety evaluation in Tokai Reprocessing Plant

    International Nuclear Information System (INIS)

    Shirai, Nobutoshi; Nakajima, Masayoshi; Takaya, Akikazu; Ohnuma, Hideyuki; Shirouzu, Hidetomo; Hayashi, Shinichiro; Yoshikawa, Koji; Suto, Toshiyuki

    2000-04-01

    Criticality limits for equipments in Tokai Reprocessing Plant which handle fissile material solution and are under shape and dimension control were reevaluated based on the guideline No.10 'Criticality safety of single unit' in the regulatory guide for reprocessing plant safety. This report presents criticality safety evaluation of each equipment as single unit. Criticality safety of multiple units in a cell or a room was also evaluated. The evaluated equipments were ones in dissolution, separation, purification, denitration, Pu product storage, and Pu conversion processes. As a result, it was reconfirmed that the equipments were safe enough from a view point of criticality safety of single unit and multiple units. (author)

  5. Siting of nuclear facilities. Selections from Nuclear Safety

    International Nuclear Information System (INIS)

    Buchanan, J.R.

    1976-07-01

    The report presented siting policy and practice for nuclear power plants as developed in the U.S. and abroad. Twenty-two articles from Nuclear Safety on this general topic are reprinted since they provide a valuable reference source. The appendices also include reprints of some relevant regulatory rules and guides on siting. Advantages and disadvantages of novel siting concepts such as underground containment, offshore siting, and nuclear energy parks are addressed. Other topics include site criteria, risk criteria, and nuclear ship criteria

  6. Siting of nuclear facilities. Selections from Nuclear Safety

    Energy Technology Data Exchange (ETDEWEB)

    Buchanan, J.R.

    1976-07-01

    The report presented siting policy and practice for nuclear power plants as developed in the U.S. and abroad. Twenty-two articles from Nuclear Safety on this general topic are reprinted since they provide a valuable reference source. The appendices also include reprints of some relevant regulatory rules and guides on siting. Advantages and disadvantages of novel siting concepts such as underground containment, offshore siting, and nuclear energy parks are addressed. Other topics include site criteria, risk criteria, and nuclear ship criteria.

  7. Evaluating safety management system implementation

    International Nuclear Information System (INIS)

    Preuss, M.

    2009-01-01

    Canada is committed to not only maintaining, but also improving upon our record of having one of the safest aviation systems in the world. The development, implementation and maintenance of safety management systems is a significant step towards improving safety performance. Canada is considered a world leader in this area and we are fully engaged in implementation. By integrating risk management systems and business practices, the aviation industry stands to gain better safety performance with less regulatory intervention. These are important steps towards improving safety and enhancing the public's confidence in the safety of Canada's aviation system. (author)

  8. 2005 dossier: clay. Tome: safety evaluation of the geologic disposal

    International Nuclear Information System (INIS)

    2005-01-01

    This document makes a status of the researches carried out by the French national agency of radioactive wastes (ANDRA) about the safety aspects of an argilite-type geologic disposal facility for high-level and long-lived (HLLL) radioactive wastes. Content: 1 - safety approach: context and general goals, general safety principles, specificity of the argilite repository safety approach, general approach; 2 - general description: HLLL wastes, geologic context of the Meuse/Haute-Marne site, repository architecture; 3 - safety functions and disposal design: time and space scales, safety approach by functions, functional analysis methodology, analysis of safety functions during the construction, exploitation and observation phases, safety functions analysis during post-closure phase; 4 - operational safety: dosimetric evaluation, risk analysis (explosible gases, fire hazards, lift cage drop, container drop); 5 - long-term efficiency of the disposal facility: normal evolution scenario, from conceptual models to the safety calculation model, description of the safety model, quantitative evaluation of the normal evolution scenario, main lessons learnt from the efficiency analysis; 6 - management of uncertainties: identification, building up of altered situations, mastery of uncertainties; 7 - evaluation of altered evolution scenarios: sealing defect scenario, container defect scenario, drilling scenario, strongly degraded operation scenario; 8 - conclusions: lessons learnt, possible improvements. (J.S.)

  9. Intra-site Secure Transport Vehicle test and evaluation

    International Nuclear Information System (INIS)

    Scott, S.

    1995-01-01

    In the past many DOE and DoD facilities involved in handling nuclear material realized a need to enhance the safely and security for movement of sensitive materials within their facility, or ''intra-site''. There have been prior efforts to improve on-site transportation; however, there remains a requirement for enhanced on-site transportation at a number of facilities. The requirements for on-site transportation are driven by security, safety, and operational concerns. The Intra-site Secure Transport Vehicle (ISTV) was designed to address these concerns specifically for DOE site applications with a standardized vehicle design. This paper briefly reviews the ISTV design features providing significant enhancement of onsite transportation safety and security, and also describes the test and evaluation activities either complete of underway to validate the vehicle design and operation

  10. A program approach for site safety at oil spills

    International Nuclear Information System (INIS)

    Whipple, F.L.; Glenn, S.P.; Ocken, J.J.; Ott, G.L.

    1993-01-01

    When OSHA developed the hazardous waste operations (Hazwoper) regulations (29 CFR 1910.120) members of the response community envisioned a separation of oil and open-quotes hazmatclose quotes response operations. Organizations that deal with oil spills have had difficulty applying Hazwoper regulations to oil spill operations. This hinders meaningful implementation of the standard for their personnel. We should approach oil spills with the same degree of caution that is applied to hazmat response. Training frequently does not address the safety of oil spill response operations. Site-specific safety and health plans often are neglected or omitted. Certain oils expose workers to carcinogens, as well as chronic and acute hazards. Significant physical hazards are most important. In responding to oil spills, the hazards must be addressed. It is the authors' contention that a need exists for safety program at oil spill sites. Gone are the days of labor pool hires cleaning up spills in jeans and sneakers. The key to meaningful programs for oil spills requires application of controls focused on relevant safety risks rather than minimal chemical exposure hazards. Working with concerned reviewers from other agencies and organizations, the authors have developed a general safety and health program for oil spill response. It is intended to serve as the basis for organizations to customize their own written safety and health program (required by OSHA). It also provides a separate generic site safety plan for emergency phase oil spill operations (check-list) and long term post-emergency phase operations

  11. Safety evaluation of advance street name signs

    Science.gov (United States)

    2009-06-01

    The Federal Highway Administration (FHWA) organized a pooled fund study of 26 States to evaluate low-cost safety strategies as part of its strategic highway safety effort. The objective of the pooled fund study was to estimate the safety effectivenes...

  12. Status of Nuclear Safety evaluation in China

    International Nuclear Information System (INIS)

    Tian Jiashu

    1999-01-01

    Chinese nuclear safety management and control follows international practice, the regulations are mainly from IAEA with the Chinese condition. The regulatory body is National Nuclear Safety Administration (NNSA). The nuclear safety management, surveillance, safety review and evaluation are guided by NNSA with technical support by several units. Beijing Review Center of Nuclear Safety is one of these units, which was founded in 1987 within Beijing Institute of nuclear Engineering (BINE), co-directed by NNSA and BINE, it is the first technical support team to NNSA. Most of the safety reviews and evaluations of Chinese nuclear installations has been finished by this unit. It is described briefly in this paper that the NNSA's main function and organization, regulations on the nuclear safety, procedure of application and issuing of license, the main activities performed by Beijing Review Center of Nuclear Safety, the situation of severe accident analyses in China, etc. (author)

  13. Safety assessment input for site selection - the Swedish example - 59031

    International Nuclear Information System (INIS)

    Andersson, Johan

    2012-01-01

    Svensk Kaernbraenslehantering AB (SKB) has performed comprehensive investigations of two candidate sites for a final repository for Sweden's spent nuclear fuel. In March 2011 SKB decided to submit licence applications for a final repository at Forsmark. Before selection, SKB stated that the site that offers the best prospects for achieving long-term safety in practice would be selected. Based on experiences previous safety assessments, a number of issues related to long-term safety need to be considered in the context of site comparison. The factors include sensitivity to climate change such as periods of permafrost and glaciations, rock mechanics evolution including the potential for thermally induced spalling and sensitivity to potential future earthquakes, current and future groundwater flow, evolution of groundwater composition and proximity to mineral resources. Each of these factors related to long-term safety for the two candidate sites is assessed in a comparative analysis of site characteristics. The assessment also considers differences in biosphere conditions and in the confidence of the site descriptions. The comparison is concluded by an assessment on how the identified differences would affect the estimated radiological risk from a repository located at either of the sites. The assessment concludes that there are a number of safety related site characteristics for which the analyses do not show any decisive differences in terms of implications on safety, between the sites Forsmark and Laxemar. However, the frequency of water conducting fractures at repository depth is much smaller at Forsmark than at Laxemar. This difference, in turn, affects the future stability of the current favourable groundwater composition, which combined with the much higher flows at Laxemar would, for the current repository design, lead to a breach in the safety functions for the buffer and the canister for many more deposition positions at Laxemar than at Forsmark. Thereby

  14. Evaluation on safety issues of SMART

    International Nuclear Information System (INIS)

    Kim, W. S.; Seol, K. W.; Yoon, Y. K.; Lee, J. H.

    2001-01-01

    Safety issues on the SMART were evaluated in the light of the compliance with the Ministerial Ordinance of Technical Requirements applying to Nuclear Installations, which was recently revised. Evaluation concludes that regulatory requirements associated with following items have to be developed as the licensing criteria for the SMART: (1) proving the safety of design or materials different form existing reactors; (2) coping with beyond design basis accidents; (3) rulemaking on the safety of reactor safeguard vessel ; (4) ensuring integrity of steam generator tubes; and (5) classifying equipment based on their safety significance. Appropriate actions including implementation of new requirements under development should be taken for safety issues such as diversity of reactivity control and in-service inspection of steam generator tubes that are not complied with the current Technical Requirements. Safety level of the SMART design will be evaluated further by the more detailed assessment according to the Technical Requirements, and additional safety issues will be identified and resolved, if it necessary

  15. Safety criteria for siting a nuclear power plant

    International Nuclear Information System (INIS)

    2001-01-01

    The guide sets forth requirements for safety of the population and the environment in nuclear power plant siting. It also sets out the general basis for procedures employed by other competent authorities when they issue regulations or grant licences. On request STUK (Radiation and Nuclear Safety Authority of Finland) issues case-specific statements about matters relating to planning and about other matters relating to land use in the environment of nuclear power plants

  16. Savannah River Site K-Reactor Probabilistic Safety Assessment

    International Nuclear Information System (INIS)

    Brandyberry, M.D.; Bailey, R.T.; Baker, W.H.; Kearnaghan, D.P.; O'Kula, K.R.; Wittman, R.S.; Woody, N.D.; Amos, C.N.; Weingardt, J.J.

    1992-12-01

    This report gives the results of a Savannah River Site (SRS) K-Reactor Probabilistic Safety Assessment (PSA). Measures of adverse consequences to health and safety resulting from representations of severe accidents in SRS reactors are presented. In addition, the report gives a summary of the methods employed to represent these accidents and to assess the resultant consequences. The report is issued to provide useful information to the U. S. Department of Energy (DOE) on the risk of operation of SRS reactors, for insights into severe accident phenomena that contribute to this risk, and in support of improved bases for other DOE programs in Heavy Water Reactor safety

  17. Empirical estimation of school siting parameter towards improving children's safety

    Science.gov (United States)

    Aziz, I. S.; Yusoff, Z. M.; Rasam, A. R. A.; Rahman, A. N. N. A.; Omar, D.

    2014-02-01

    Distance from school to home is a key determination in ensuring the safety of hildren. School siting parameters are made to make sure that a particular school is located in a safe environment. School siting parameters are made by Department of Town and Country Planning Malaysia (DTCP) and latest review was on June 2012. These school siting parameters are crucially important as they can affect the safety, school reputation, and not to mention the perception of the pupil and parents of the school. There have been many studies to review school siting parameters since these change in conjunction with this ever-changing world. In this study, the focus is the impact of school siting parameter on people with low income that live in the urban area, specifically in Johor Bahru, Malaysia. In achieving that, this study will use two methods which are on site and off site. The on site method is to give questionnaires to people and off site is to use Geographic Information System (GIS) and Statistical Product and Service Solutions (SPSS), to analyse the results obtained from the questionnaire. The output is a maps of suitable safe distance from school to house. The results of this study will be useful to people with low income as their children tend to walk to school rather than use transportation.

  18. TAPS safety evaluation criteria for reload fueling

    International Nuclear Information System (INIS)

    Mahendra Nath; Veeraraghavan, N.

    1976-01-01

    To improve operating performance of Tarapur reactors, several proposals are under consideration such as core expansion, change-over to an improved fuel design with lower heat rating, extension of fuel cycle lengths etc., which have a bearing on overall plant operating characteristics and reactor safety. For evaluating safety implications of the various proposals, it is necessary to formulate safety evaluation criteria for reload fuelling. Salient features of these criteria are discussed. (author)

  19. Parameters Evaluation of PLC Dependability and Safety

    Directory of Open Access Journals (Sweden)

    Juraj Zdansky

    2006-01-01

    Full Text Available This paper is focused on evaluation of dependability and safety parameters of PLC (Programmable Logic Controller. Achievement of requested level of these parameters is an application assumption for using PLC in control of safety critical processes. Evaluation of these parameters can be made on the base of suitable model and it can be influenced by system architecture when necessary.

  20. Use of a Web Site to Enhance Criticality Safety Training

    International Nuclear Information System (INIS)

    Huang, S T; Morman, J

    2003-01-01

    Currently, a website dedicated to enhancing communication and dissemination of criticality safety information is sponsored by the U.S. Department of Energy (DOE) Nuclear Criticality Safety Program (NCSP). This website was developed as part of the DOE response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 97-2, which reflected the need to make criticality safety information available to a wide audience. The website is the focal point for DOE nuclear criticality safety (NCS) activities, resources and references, including hyperlinks to other sites actively involved in the collection and dissemination of criticality safety information. The website is maintained by the Lawrence Livermore National Laboratory (LLNL) under auspices of the NCSP management. One area of the website contains a series of Nuclear Criticality Safety Engineer Training (NCSET) modules. During the past few years, many users worldwide have accessed the NCSET section of the NCSP website and have downloaded the training modules as an aid for their training programs. This trend was remarkable in that it points out a continuing need of the criticality safety community across the globe. It has long been recognized that training of criticality safety professionals is a continuing process involving both knowledge-based training and experience-based operations floor training. As more of the experienced criticality safety professionals reach retirement age, the opportunities for mentoring programs are reduced. It is essential that some method be provided to assist the training of young criticality safety professionals to replenish this limited human expert resource to support on-going and future nuclear operations. The main objective of this paper is to present the features of the NCSP website, including its mission, contents, and most importantly its use for the dissemination of training modules to the criticality safety community. We will discuss lessons learned and several ideas

  1. Strategy for safety case development: impact of a volunteering approach to siting a japanese HLW repository

    International Nuclear Information System (INIS)

    Kitayama, K.; Ishiguro, K.; Takeuchi, M.; Tsuchi, H.; Kato, T.; Sakabe, Y.; Wakasugi, K.

    2008-01-01

    NUMO strategy for safety case development is constrained by a staged siting approach, which has been initiated by a call for volunteer municipalities to host the HLW repository. For each site, the safety case is an important factor to be considered at the selection steps which narrow down towards the preferred repository location. This is particularly challenging, however, as every site requires a tailored repository concept, with associated performance assessment and an individual site evaluation programme all of which evolve with gradually increasing understanding of the host environment. In order to maintain flexibility without losing focus, NUMO has developed a formalized tailoring procedure, termed the NUMO Structured Approach (NSA). The NSA guides the interaction of the key site characterisation, repository design and performance assessment groups and is facilitated by tools to help the decision making associated with the tailoring process (e.g. a requirements management system) and with comparison of siting and design options (e.g. multi-attribute analysis). Pragmatically, the post-closure safety case will initially emphasize near-field processes and a robust engineering barrier system, considering the limited geological information at early stages. This will be complemented by a more realistic assessment of total system performance, as needed to compare options. In addition, efforts to rigorously assess operational phase safety and the practicality of assuring quality of the constructed engineered barriers are components of the total safety case which are receiving particular attention now, as they may better discriminate between sites while information is still limited. (authors)

  2. Safety evaluations required in the safety regulations for Monju and the validity confirmation of safety evaluation methods

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    The purposes of this study are to perform the safety evaluations of the fast breeder reactor 'Monju' and to confirm the validity of the safety evaluation methods. In JFY 2012, the following results were obtained. As for the development of safety evaluation methods needed in the safety examination achieved for the reactor establishment permission, development of the analysis codes, such as a core damage analysis code, were carried out according to the plan. As for the development of the safety evaluation method needed for the risk informed safety regulation, the quantification technique of the event tree using the Continuous Markov chain Monte Carlo method (CMMC method) were studied. (author)

  3. Drug safety evaluation of defibrotide.

    Science.gov (United States)

    Richardson, Paul G; Corbacioglu, Selim; Ho, Vincent Trien-Vinh; Kernan, Nancy A; Lehmann, Leslie; Maguire, Craig; Maglio, Michelle; Hoyle, Margaret; Sardella, Marco; Giralt, Sergio; Holler, Ernst; Carreras, Enric; Niederwieser, Dietger; Soiffer, Robert

    2013-01-01

    Hepatic veno-occlusive disease (VOD), also known as sinusoidal obstruction syndrome (SOS), is a potentially life-threatening complication of chemotherapeutic conditioning used in preparation for hematopoietic stem-cell transplantation (SCT). Defibrotide (DF) has been shown in Phase II and III trials to improve complete response in patients with severe VOD (sVOD). None of the articles, to date, provide a comprehensive review of the safety of DF in VOD and/or a range of other conditions. This article reviews current clinical findings on DF, primarily in terms of safety for use in treatment and prophylaxis of VOD, and relevant safety data for its use in other diseases. The literature review was conducted using a PubMed search with the fixed term 'defibrotide' in combination with ≥ 1 of 'safety', 'veno-occlusive disease' (with and without 'treatment', 'prevention'), 'oncology', 'myeloma', 'microangiopathy', 'anti-thrombotic' and 'peripheral vascular disorder'. Related articles from the EBMT and ASH conference websites were also included. DF was well tolerated in majority of the studies. The safety profile of DF is largely favourable with toxicities comparable to control populations in the setting of SCT complicated by sVOD.

  4. Evaluation of seismic hazards for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2002-01-01

    The main objective of this Safety Guide is to provide recommendations on how to determine the ground motion hazards for a plant at a particular site and the potential for surface faulting, which could affect the feasibility of construction and safe operation of a plant at that site. The guidelines and procedures presented in this Safety Guide can appropriately be used in evaluations of site suitability and seismic hazards for nuclear power plants in any seismotectonic environment. The probabilistic seismic hazard analysis recommended in this Safety Guide also addresses the needs for seismic hazard analysis of external event PSAs conducted for nuclear power plants. Many of the methods and processes described may also be applicable to nuclear facilities other than power plants. Other phenomena of permanent ground displacement (liquefaction, slope instability, subsidence and collapse) as well as the topic of seismically induced flooding are treated in Safety Guides relating to foundation safety and coastal flooding. Recommendations of a general nature are given in Section 2. Section 3 discusses the acquisition of a database containing the information needed to evaluate and address all hazards associated with earthquakes. Section 4 covers the use of this database for construction of a seismotectonic model. Sections 5 and 6 review ground motion hazards and evaluations of the potential for surface faulting, respectively. Section 7 addresses quality assurance in the evaluation of seismic hazards for nuclear power plants

  5. SSC [Superconducting Super Collider] site evaluations

    International Nuclear Information System (INIS)

    1988-11-01

    With this report, the SSC Site Task Force forwards to the Director, Office of Energy Research, US Department of Energy (DOE), its evaluation of the technical criteria and life-cycle costs for the proposed SSC sites judged to be the best qualified. The criteria against which each site was evaluated are those set forth in the Invitation for Site Proposals for the Superconducting Super Collider (DOE/ER-0315) (Invitation) which was prepared by the Task Force and issued in April 1987. The methodology followed by the Task Force in this report and in all other phases of the proposal evaluation has been consistent with the SSC site selection process approved by DOE's Energy System Acquisition Advisory Board (ESAAB). The goal of the site selection process is to identify a site that will permit the highest level of research productivity and overall effectiveness of the SSC at a reasonable cost of construction and operation and with minimial impact on the environment. The Task Force acknowledges that all seven sites are, indeed, highly qualified locations for the construction and operation of the SSC on the basis of technical and cost considerations. In performing its evaluation, which is presented in this paper, the Task Force took an in-depth look at each site on the basis of site visits and extensive technical analyses. A consensus rating for each technical evaluation criterion and subcriterion was developed for each site

  6. Use of a web site to enhance criticality safety training

    International Nuclear Information System (INIS)

    Huang, Song T.; Morman, James A.

    2003-01-01

    Establishment of the NCSP (Nuclear Criticality Safety Program) website represents one attempt by the NCS (Nuclear Criticality Safety) community to meet the need to enhance communication and disseminate NCS information to a wider audience. With the aging work force in this important technical field, there is a common recognition of the need to capture the corporate knowledge of these people and provide an easily accessible, web-based training opportunity to those people just entering the field of criticality safety. A multimedia-based site can provide a wide range of possibilities for criticality safety training. Training modules could range from simple text-based material, similar to the NCSET (Nuclear Criticality Safety Engineer Training) modules, to interactive web-based training classes, to video lecture series. For example, the Los Alamos National Laboratory video series of interviews with pioneers of criticality safety could easily be incorporated into training modules. Obviously, the development of such a program depends largely upon the need and participation of experts who share the same vision and enthusiasm of training the next generation of criticality safety engineers. The NCSP website is just one example of the potential benefits that web-based training can offer. You are encouraged to browse the NCSP website at http://ncsp.llnl.gov. We solicit your ideas in the training of future NCS engineers and welcome your participation with us in developing future multimedia training modules. (author)

  7. Approach to uncertainty evaluation for safety analysis

    International Nuclear Information System (INIS)

    Ogura, Katsunori

    2005-01-01

    Nuclear power plant safety used to be verified and confirmed through accident simulations using computer codes generally because it is very difficult to perform integrated experiments or tests for the verification and validation of the plant safety due to radioactive consequence, cost, and scaling to the actual plant. Traditionally the plant safety had been secured owing to the sufficient safety margin through the conservative assumptions and models to be applied to those simulations. Meanwhile the best-estimate analysis based on the realistic assumptions and models in support of the accumulated insights could be performed recently, inducing the reduction of safety margin in the analysis results and the increase of necessity to evaluate the reliability or uncertainty of the analysis results. This paper introduces an approach to evaluate the uncertainty of accident simulation and its results. (Note: This research had been done not in the Japan Nuclear Energy Safety Organization but in the Tokyo Institute of Technology.) (author)

  8. A refined safety analysis approach for closure of the Hanford Site flammable gas unreviewed safety question

    International Nuclear Information System (INIS)

    Bratzel, D.R.

    1997-01-01

    Following a 1990 investigation into flammable gas generation, retention, and release mechanisms within the Hanford Site high-level waste tanks, personnel concluded that the existing Authorization Basis documentation did not adequately evaluate flammable gas hazards. This declaration was based primarily on the fact that personnel did not adequately consider hydrogen and nitrous oxide evolution within the material in certain waste tanks and subsequent hypothetical ignition in the development of safety documentation for the waste tanks. The US Department of Energy-Headquarters subsequently declared an Unreviewed Safety Question (USQ). Although work scope has been focused on closure of the USQ since 1990, the DOE has yet to close the USQ because of considerable uncertainty regarding essential technical parameters and associated risk. The DOE recently approved a Basis for Interim Operation to revise the Authorization Basis for managing the tank farms, however, the USQ remains open. The two fundamental requirements for closure of the flammable gas USQ are as follows: development of a defensible technical basis for existing controls; development of a process to assess the adequacy of controls as the waste tank mission progresses

  9. Corrosion calculations report for the safety assessment SR-Site

    International Nuclear Information System (INIS)

    2010-12-01

    This report is a compilation of the quantitative assessments of corrosion of the copper canisters in a KBS-3 repository. The calculations are part of the safety assessment SR-Site that is the long-term safety assessment to support the license application for building a final repository for spent nuclear fuel at Forsmark, Sweden. The safety assessment methodology gives the frame for the structured and documented approach to assess all conceivable corrosion processes. The quantitative assessments are done in different ways depending on the nature of the process and on the implications for the long-term safety. The starting point for the handling of the corrosion processes is the description of all known corrosion processes for copper with the current knowledge base and applied to the specific system and geology. Already at this stage some processes are excluded for further analysis, for example if the repository environment is not a sufficient prerequisite for the process to occur. The next step is to identify processes where the extent of corrosion could be bounded, e.g. by a mass balance approach. For processes where a mass balance is not limiting, the mass transport of corrodants (or corrosion products) is taken into account. A simple approach would be just to calculate the diffusive transport of corrodants through the bentonite, but generally the transport resistance for the interface between groundwater in a rock fracture intersecting the deposition hole and the bentonite buffer is more important. In SR-Site, the concept of equivalent flowrate, Q eq , is used. This assessment is done integrated with the evaluation of the geochemical and hydrogeological evolution of the repository. For most of the corrosion processes analysed, the corrosion depth is much smaller than the copper shell thickness, even for the assessment time of 10 6 years. Several processes give corrosion depths less than 100 μm, but no process give corrosion depths larger than a few millimetres

  10. Corrosion calculations report for the safety assessment SR-Site

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    This report is a compilation of the quantitative assessments of corrosion of the copper canisters in a KBS-3 repository. The calculations are part of the safety assessment SR-Site that is the long-term safety assessment to support the license application for building a final repository for spent nuclear fuel at Forsmark, Sweden. The safety assessment methodology gives the frame for the structured and documented approach to assess all conceivable corrosion processes. The quantitative assessments are done in different ways depending on the nature of the process and on the implications for the long-term safety. The starting point for the handling of the corrosion processes is the description of all known corrosion processes for copper with the current knowledge base and applied to the specific system and geology. Already at this stage some processes are excluded for further analysis, for example if the repository environment is not a sufficient prerequisite for the process to occur. The next step is to identify processes where the extent of corrosion could be bounded, e.g. by a mass balance approach. For processes where a mass balance is not limiting, the mass transport of corrodants (or corrosion products) is taken into account. A simple approach would be just to calculate the diffusive transport of corrodants through the bentonite, but generally the transport resistance for the interface between groundwater in a rock fracture intersecting the deposition hole and the bentonite buffer is more important. In SR-Site, the concept of equivalent flowrate, Q{sub eq}, is used. This assessment is done integrated with the evaluation of the geochemical and hydrogeological evolution of the repository. For most of the corrosion processes analysed, the corrosion depth is much smaller than the copper shell thickness, even for the assessment time of 106 years. Several processes give corrosion depths less than 100 mum, but no process give corrosion depths larger than a few

  11. Seismic Hazard Assessment in Site Evaluation for Nuclear Installations: Ground Motion Prediction Equations and Site Response

    International Nuclear Information System (INIS)

    2016-07-01

    The objective of this publication is to provide the state-of-the-art practice and detailed technical elements related to ground motion evaluation by ground motion prediction equations (GMPEs) and site response in the context of seismic hazard assessments as recommended in IAEA Safety Standards Series No. SSG-9, Seismic Hazards in Site Evaluation for Nuclear Installations. The publication includes the basics of GMPEs, ground motion simulation, selection and adjustment of GMPEs, site characterization, and modelling of site response in order to improve seismic hazard assessment. The text aims at delineating the most important aspects of these topics (including current practices, criticalities and open problems) within a coherent framework. In particular, attention has been devoted to filling conceptual gaps. It is written as a reference text for trained users who are responsible for planning preparatory seismic hazard analyses for siting of all nuclear installations and/or providing constraints for anti-seismic design and retrofitting of existing structures

  12. Data report for the safety assessment SR-Site

    International Nuclear Information System (INIS)

    2010-12-01

    This report compiles, documents, and qualifies input data identified as essential for the long-term safety assessment of a KBS-3 repository, and forms an important part of the reporting of the safety assessment project SR-Site. The input data concern the repository system, broadly defined as the deposited spent nuclear fuel, the engineered barriers surrounding it, the host rock, and the biosphere in the proximity of the repository. The input data also concern external influences acting on the system, in terms of climate related data. Data are provided for a selection of relevant conditions and are qualified through traceable standardised procedures

  13. Data report for the safety assessment SR-Site

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    This report compiles, documents, and qualifies input data identified as essential for the long-term safety assessment of a KBS-3 repository, and forms an important part of the reporting of the safety assessment project SR-Site. The input data concern the repository system, broadly defined as the deposited spent nuclear fuel, the engineered barriers surrounding it, the host rock, and the biosphere in the proximity of the repository. The input data also concern external influences acting on the system, in terms of climate related data. Data are provided for a selection of relevant conditions and are qualified through traceable standardised procedures

  14. Site Safety Plan for Lawrence Livermore National Laboratory CERCLA investigations

    Energy Technology Data Exchange (ETDEWEB)

    Bainer, R.; Duarte, J.

    1993-07-01

    The safety policy of LLNL is to take every reasonable precaution in the performance of work to protect the environment and the health and safety of employees and the public, and to prevent property damage. With respect to hazardous agents, this protection is provided by limiting human exposures, releases to the environment, and contamination of property to levels that are as low as reasonably achievable (ALARA). It is the intent of this Plan to supply the broad outline for completing environmental investigations within ALARA guidelines. It may not be possible to determine actual working conditions in advance of the work; therefore, planning must allow the opportunity to provide a range of protection based upon actual working conditions. Requirements will be the least restrictive possible for a given set of circumstances, such that work can be completed in an efficient and timely fashion. Due to the relatively large size of the LLNL Site and the different types of activities underway, site-specific Operational Safety Procedures (OSPs) will be prepared to supplement activities not covered by this Plan. These site-specific OSPs provide the detailed information for each specific activity and act as an addendum to this Plan, which provides the general plan for LLNL Main Site operation.

  15. New Reactor Siting in Finland, Hanhikivi Site in Pyhaejoki - STUK preliminary safety assessment

    International Nuclear Information System (INIS)

    Nevalainen, Janne

    2013-01-01

    STUK has performed a preliminary assessment of the Decision-in-Principle on the Fennovoima application. A variety of factors must be considered in the selection of a site, including effects of the site on the plant design and the effects of the plant on the site environment. These include external hazards, both natural and human-induced. Since this is a new site, an extensive siting process is followed, that can include an EIA. A site survey is performed to identify candidate sites, after investigating a large region and rejecting unsuitable sites. The remaining sites are then screened and compared on the basis of safety and other considerations to select one or more preferred sites. Natural hazards include geology, seismology, hydrology and meteorology. Offshore ice will be a particular hazard for this plant, since the site is on average only 1.5 m above sea level. The design basis earthquake corresponds to a return frequency of 100,000 years, with 50 % confidence. The existing sites in southern Finland used a design peak ground acceleration of 0.1 g with the ground response spectrum maximum at 10 Hz. The candidate sites in northern Finland will require a peak ground acceleration of 0.2 g with the ground response spectrum maximum at 25 Hz

  16. Lessons learned in the implementation of Integrated Safety Management at DOE Order Compliance Sites vs Necessary and Sufficient Sites

    International Nuclear Information System (INIS)

    Hill, R.L.

    2000-01-01

    This paper summarizes the development and implementation of Integrated Safety Management (ISM) at an Order Compliance Site (Savannah River Site) and a Necessary and Sufficient Site (Nevada Test Site). A discussion of each core safety function of ISM is followed by an example from an Order Compliance Site and a Necessary and Sufficient Site. The Savannah River Site was the first DOE site to have a DOE Headquarters-validated and approved ISM System. The NTS is beginning the process of verification and validation. This paper defines successful strategies for integrating Environment, Safety, and Health management into work under various scenarios

  17. Environment, Safety and Health Progress Assessment of the Hanford Site

    International Nuclear Information System (INIS)

    1992-05-01

    This report documents the result of the US Department of Energy (DOE) Environment, Safety and Health (ES ampersand H) Progress Assessment of the Hanford Site, in Richland, Washington. The assessment, which was conducted from May 11 through May 22, 1992, included a selective-review of the ES ampersand H management systems and programs of the responsible DOE Headquarters Program Offices the DOE Richland Field Office, and the site contractors. The ES ampersand H Progress Assessments are part of the Secretary of Energy's continuing effort to institutionalize line management accountability and the self-assessment process throughout DOE and its contractor organizations. The purpose of the Hanford Site ES ampersand H Progress Assessment is to provide the Secretary with an independent assessment of the adequacy and effectiveness of the DOE and contractor management structures, resources, and systems to address ES ampersand H problems and requirements. They are not intended to be comprehensive compliance assessments of ES ampersand H activities. The point of reference for assessing programs at the Hanford Site was, for the most part, the Tiger Team Assessment of the Hanford Site, which was conducted from May 21 through July 18, 1990. A summary of issues and progress in the areas of environment, safety and health, and management is included

  18. Health and Safety Procedures Manual for hazardous waste sites

    Energy Technology Data Exchange (ETDEWEB)

    Thate, J.E.

    1992-09-01

    The Oak Ridge National Laboratory Chemical Assessments Team (ORNL/CAT) has developed this Health and Safety Procedures Manual for the guidance, instruction, and protection of ORNL/CAT personnel expected to be involved in hazardous waste site assessments and remedial actions. This manual addresses general and site-specific concerns for protecting personnel, the general public, and the environment from any possible hazardous exposures. The components of this manual include: medical surveillance, guidance for determination and monitoring of hazards, personnel and training requirements, protective clothing and equipment requirements, procedures for controlling work functions, procedures for handling emergency response situations, decontamination procedures for personnel and equipment, associated legal requirements, and safe drilling practices.

  19. Reactor safety under design basis flood condition for inland sites

    International Nuclear Information System (INIS)

    Hajela, S.; Bajaj, S.S.; Samota, A.; Verma, U.S.P.; Warudkar, A.S.

    2002-01-01

    Full text: In June 1994, there was an incident of flooding at Kakrapar Atomic Power Station (KAPS) due to combination of heavy rains and mechanical failure in the operation of gates at the adjoining weir. An indepth review of the incident was carried out and a number of flood protection measures were recommended and were implemented at site. As part of this review, a safety analysis was also done to demonstrate reactor safety with a series of failures considered in the flood protection features. For each inland NPP site, as part of design, different flood scenarios are analysed to arrive at design basis flood (DBF) level. This level is estimated based on worst combination of heavy local precipitation, flooding in river, failure of upstream/downstream water control structures

  20. Experiment on safety software evaluation

    International Nuclear Information System (INIS)

    Soubies, B.; Henry, J.Y.

    1994-06-01

    The licensing procedures process of nuclear plants includes compulsory steps which bring about a thorough exam of the commands control system. In this context the IPSN uses a tool called MALPAS to carry out an analysis of the quality of the software involved in safety control. The IPSN also try to obtain the automation of the generation of test games necessary for dynamical analysis. The MALPAS tool puts forward the particularities of programing which can influence the testability and the upholding of the studied software. (TEC). 4 refs

  1. Resolving the Ferrocyanide Safety Issue at the Hanford Site

    International Nuclear Information System (INIS)

    Meacham, J.E.; Cash, R.J.; Babad, H.

    1994-02-01

    Considerable data have been obtained on the chemical and physical properties of ferrocyanide waste stored in Hanford Site single-shell tanks (SSTs). Theoretical analyses and ferrocyanide waste simulant studies have led to the development of fuel, moisture, and temperature criteria that define continued safe storage. Developing the criteria provides the technical basis for closing the Ferrocyanide Unreviewed Safety Question (USQ). Using the safety criteria, the ferrocyanide tanks have been ranked into one of three safety categories: Safe, Conditionally Safe, and Unsafe. All the ferrocyanide tanks are currently ranked in either the Safe or Conditionally Safe categories. Analyses of core samples taken from three ferrocyanide tanks have shown cyanide concentrations about a factor of ten lower than predicted by the original flowsheets. Hydrolytic and radiolytic destruction (aging) of the ferrocyanide matrix has occurred during the 35 plus years the waste has been stored at the Hanford Site. Because of waste aging, it is possible that all of the ferrocyanide tanks may now contain less than the 8 wt % sodium nickel ferrocyanide specified in the fuel criterion for the Safe category. Ferrocyanide tanks that remain in the Conditionally Safe category may require monitoring and surveillance to verify that the waste remains in an unreactive state. Further characterization of the tanks by core sampling and analyses should lead to resolution of the Ferrocyanide Safety Issue by September 1997

  2. FEP report for the safety assessment SR-Site

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    This report documents the analysis and processing of features, events and processes, FEPs, that has been carried out within the safety assessment SR-Site, and forms an important part of the reporting of the project. The main part of the work was conducted within the earlier safety assessment SR-Can, which was a preparatory stage for the SR-Site assessment. The overall objective of the FEP analysis and processing in both SR-Can and SR-Site included development of a database of features, events and processes, an SKB FEP database, in a format that facilitates both a systematic analysis of FEPs and documentation of that FEP analysis, as well as facilitating revisions and updates to be made in connection with new safety assessments. The primary objective in SR-Site was to establish an SR-Site FEP catalogue within the framework of the SKB FEP database. This FEP catalogue was required to contain all FEPs that needed to be handled in SR-Site and is an update of the corresponding SR-Can FEP catalogue that was established for the SR-Can assessment. The starting point for the handling of FEPs in SR-Site was the SR-Can version of the SKB FEP database and associated SR-Can reports. The SR-Can version of the SKB FEP database includes the SR-Can FEP catalogue, as well as the sources for the identification of FEPs in SR-Can, namely the SR 97 processes and variables, Project FEPs in the NEA International FEP database version 1.2 and matrix interactions in the Interaction matrices developed for a deep repository of the KBS-3 type. Since the completion of the FEP work within SR-Can, an updated electronic version, version 2.1, of the NEA FEP database has become available. Compared with version 1.2 of the NEA FEP database, version 2.1 contains FEPs from two more projects. As part of SR-Site, all new Project FEPs in version 2.1 of the NEA FEP database have been mapped according to the methodology adopted in SR-Can resulting in an SR-Site version of the SKB FEP database. The SKB FEP

  3. FEP report for the safety assessment SR-Site

    International Nuclear Information System (INIS)

    2010-12-01

    This report documents the analysis and processing of features, events and processes, FEPs, that has been carried out within the safety assessment SR-Site, and forms an important part of the reporting of the project. The main part of the work was conducted within the earlier safety assessment SR-Can, which was a preparatory stage for the SR-Site assessment. The overall objective of the FEP analysis and processing in both SR-Can and SR-Site included development of a database of features, events and processes, an SKB FEP database, in a format that facilitates both a systematic analysis of FEPs and documentation of that FEP analysis, as well as facilitating revisions and updates to be made in connection with new safety assessments. The primary objective in SR-Site was to establish an SR-Site FEP catalogue within the framework of the SKB FEP database. This FEP catalogue was required to contain all FEPs that needed to be handled in SR-Site and is an update of the corresponding SR-Can FEP catalogue that was established for the SR-Can assessment. The starting point for the handling of FEPs in SR-Site was the SR-Can version of the SKB FEP database and associated SR-Can reports. The SR-Can version of the SKB FEP database includes the SR-Can FEP catalogue, as well as the sources for the identification of FEPs in SR-Can, namely the SR 97 processes and variables, Project FEPs in the NEA International FEP database version 1.2 and matrix interactions in the Interaction matrices developed for a deep repository of the KBS-3 type. Since the completion of the FEP work within SR-Can, an updated electronic version, version 2.1, of the NEA FEP database has become available. Compared with version 1.2 of the NEA FEP database, version 2.1 contains FEPs from two more projects. As part of SR-Site, all new Project FEPs in version 2.1 of the NEA FEP database have been mapped according to the methodology adopted in SR-Can resulting in an SR-Site version of the SKB FEP database. The SKB FEP

  4. Researches on nuclear criticality safety evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Okuno, Hiroshi; Suyama, Kenya; Nomura, Yasushi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2003-10-01

    For criticality safety evaluation of burnup fuel, the general-purpose burnup calculation code, SWAT, was revised, and its precision was confirmed through comparison with other results from OECD/NEA's burnup credit benchmarks. Effect by replacing the evaluated nuclear data from JENDL-3.2 to ENDF/B-VI and JEF-2.2 was also studied. Correction factors were derived for conservative evaluation of nuclide concentrations obtained with the simplified burnup code ORIGEN2.1. The critical masses of curium were calculated and evaluated for nuclear criticality safety management of minor actinides. (author)

  5. Researches on nuclear criticality safety evaluation

    International Nuclear Information System (INIS)

    Okuno, Hiroshi; Suyama, Kenya; Nomura, Yasushi

    2003-01-01

    For criticality safety evaluation of burnup fuel, the general-purpose burnup calculation code, SWAT, was revised, and its precision was confirmed through comparison with other results from OECD/NEA's burnup credit benchmarks. Effect by replacing the evaluated nuclear data from JENDL-3.2 to ENDF/B-VI and JEF-2.2 was also studied. Correction factors were derived for conservative evaluation of nuclide concentrations obtained with the simplified burnup code ORIGEN2.1. The critical masses of curium were calculated and evaluated for nuclear criticality safety management of minor actinides. (author)

  6. Safety culture aspects of managing for safety. Experience of a large nuclear reprocessing site

    International Nuclear Information System (INIS)

    Rycraft, H.S.

    1996-01-01

    The Nuclear Industry is going through turbulent times both in terms of public acceptance and business issues. Safety is one area which impacts on whether the business is allowed to continue, and how an organisation organizes itself. The need to cut costs to make nuclear power a viable energy resource, has forced the nuclear utilities to review manning policies, and management style, and in particular how to maintain safety standards during a period of change, and ultimately support continuing improvement of standards. The shrinking workforce requires a new style of management, one that depends more on the people of the organisation taking responsibility for safety at all levels of the organisation. Not only personal safety but the safety of their colleagues, general public and the environment. The safety culture of an organisation is indivisible from the company culture, each aspect of a culture influences the whole and so the balance between business, safety and quality, has to be managed. BNFL provides a full fuel cycle service to nuclear power plants, and associated services to many national and international organisations. The following notes are taken from the work carried out in the company, and mostly at the Nuclear Reprocessing and Waste storage Site at Sellafield, based in the North West of England. Following the recent re-organisation, the site now employs 6200 people and has a further 1500 contractors working on construction activities on the site. Activities on the site range from remote handling to hands on tasks, involving highly active materials to low level waste. (author)

  7. Plutonium Finishing Plant safety evaluation report

    International Nuclear Information System (INIS)

    1995-01-01

    The Plutonium Finishing Plant (PFP) previously known as the Plutonium Process and Storage Facility, or Z-Plant, was built and put into operation in 1949. Since 1949 PFP has been used for various processing missions, including plutonium purification, oxide production, metal production, parts fabrication, plutonium recovery, and the recovery of americium (Am-241). The PFP has also been used for receipt and large scale storage of plutonium scrap and product materials. The PFP Final Safety Analysis Report (FSAR) was prepared by WHC to document the hazards associated with the facility, present safety analyses of potential accident scenarios, and demonstrate the adequacy of safety class structures, systems, and components (SSCs) and operational safety requirements (OSRs) necessary to eliminate, control, or mitigate the identified hazards. Documented in this Safety Evaluation Report (SER) is DOE's independent review and evaluation of the PFP FSAR and the basis for approval of the PFP FSAR. The evaluation is presented in a format that parallels the format of the PFP FSAR. As an aid to the reactor, a list of acronyms has been included at the beginning of this report. The DOE review concluded that the risks associated with conducting plutonium handling, processing, and storage operations within PFP facilities, as described in the PFP FSAR, are acceptable, since the accident safety analyses associated with these activities meet the WHC risk acceptance guidelines and DOE safety goals in SEN-35-91

  8. Site selection and evaluation for nuclear power plants with respect to population distribution

    International Nuclear Information System (INIS)

    1980-01-01

    This safety guide, relating population distribution to site selection and evaluation, for nuclear power plants, forms part of the IAEA's programme, referred to as the NUSS programme (Nuclear Safety Standards). The guide presents population distribution data, requirements, examples of site screening methods, and an overview of radiological impact assessment with respect to population distribution

  9. Optimized Evaluation System to Athletic Food Safety

    OpenAIRE

    Shanshan Li

    2015-01-01

    This study presented a new method of optimizing evaluation function in athletic food safety information programming by particle swarm optimization. The process of food information evaluation function is to automatically adjust these parameters in the evaluation function by self-optimizing method accomplished through competition, which is a food information system plays against itself with different evaluation functions. The results show that the particle swarm optimization is successfully app...

  10. SGHWR safety design and evaluation

    International Nuclear Information System (INIS)

    Smith, D.R.; Merrett, D.J.; Ward, D.A.

    1977-01-01

    The paper discusses the characteristic features of the S.G.H.W.R. and identifies the single channel concept as of considerable importance. The unique feature of the design is the provision of individual spray cooling E.C.C.S. to each channel. This spray cooling occupies a prominent position in the main line safety arguments. The reliance on this form of spray cooling leads to provision of a comprehensive E.C.C.S. system of high reliability. Duplicate systems with diverse power and water sources cover the complete pressure range to give very high confidence that spray cooling is available in all major L.O.C.A.s. On the other hand hydraulic analysis of the blowdown phase demonstrates that significant convective flow is available as an alternative/supplementary cooling regime for most faults. The reactor shutdown mechanisms have also been duplicated and will be designed to high reliabilities to give surety of reactor trip in all credible faults. The comparative performance of the two systems is considered. Extent of diversity and redundancy in trip parameters is also discussed. A feature of channel concept is that the pipe sizes can be made relatively small thus restricting rates of blowdown, and the paper discusses effects of this upon long term cooling and flooding arguments. The quantities of pipework in the primary circuit introduce considerations of integrity and the paper goes on to list the measures introduced to improve segregation and protection of individual sections of the plant so that the extent of possible L.O.C.A.s is minimised. The achievement of high standards of reliability by use of in-service inspection is covered, with particular reference to the steam drums. The impact of these inspection requirements upon the very low man-rem exposures required by U.K. utilities is also included. Finally, it is noted that the provision of containment in common with other L.W.R. practice also provides a valuable engineered safety feature. The principles of

  11. Posiva safety case hydrogeochemical evolution of the Olkiluoto site

    Energy Technology Data Exchange (ETDEWEB)

    Trinchero, P.; Roman-Ross, G.; Maia, F.; Molinero, J. [Amphos 21 Consulting S.L., Barcelona (Spain)

    2014-03-15

    mackinawite, instead of pyrite, is assumed to be the sulphide mineral present in the fracture filling. The hydrochemical evolution of groundwaters at repository depth is a crucial factor that influences the long-term performance of the repository. Thus, in the framework of the Posiva safety case, a number of key geochemical parameters and related target values have been defined by Posiva. Hence, all the results presented here have been discussed in the light of these target values. The changes in the buffering capacity of the medium have been evaluated by analysing the mass balance of the pH and redox sensitive minerals, namely calcite and pyrite or mackinawite. Furthermore, the impact of potential ingresses of oxygen through the Olkiluoto bedrock has been assessed using an ad-hoc two-dimensional model. (orig.)

  12. Safety evaluation of large ventilation networks

    International Nuclear Information System (INIS)

    Barrocas, M.; Pruchon, P.; Robin, J.P.; Rouyer, J.L.; Salmon, P.

    1981-01-01

    For large ventilation networks, it is necessary to make a safety evaluation of their responses to perturbations such as blower failure, unexpected transfers, local pressurization. This evaluation is not easy to perform because of the many interrelationships between the different parts of the networks, interrelationships coming from the circulations of workers and matetials between cells and rooms and from the usefulness of air transfers through zones of different classifications. This evaluation is all the more necessary since new imperatives in energy savings push for minimizing the air flows, which tends to render the network more sensitive to perturbations. A program to evaluate safety has been developed by the Service de Protection Technique in cooperation with operators and designers of big nuclear facilities and the first applications presented here show the weak points of the installation studied from the safety view point

  13. Squale: evaluation criteria of functioning safety

    International Nuclear Information System (INIS)

    Deswarte, Y.; Kaaniche, M.; Benoit, P.

    1998-05-01

    The SQUALE (security, safety and quality evaluation for dependable systems) project is part of the ACTS (advanced communications, technologies and services) European program. Its aim is to develop confidence evaluation criteria to test the functioning safety of systems. All industrial sectors that use critical applications (nuclear, railway, aerospace..) are concerned. SQUALE evaluation criteria differ from the classical evaluation methods: they are independent of the application domains and industrial sectors, they take into account the overall functioning safety attributes, and they can progressively change according to the level of severity required. In order to validate the approach and to refine the criteria, a first experiment is in progress with the METEOR automatic underground railway and another will be carried out on a telecommunication system developed by Bouygues company. (J.S.)

  14. Safety culture management and quantitative indicator evaluation

    International Nuclear Information System (INIS)

    Mandula, J.

    2002-01-01

    This report discuses a relationship between safety culture and evaluation of quantitative indicators. It shows how a systematic use of generally shared operational safety indicators may contribute to formation and reinforcement of safety culture characteristics in routine plant operation. The report also briefly describes the system of operational safety indicators used at the Dukovany plant. It is a PC database application enabling an effective work with the indicators and providing all users with an efficient tool for making synoptic overviews of indicator values in their links and hierarchical structure. Using color coding, the system allows quick indicator evaluation against predefined limits considering indicator value trends. The system, which has resulted from several-year development, was completely established at the plant during the years 2001 and 2002. (author)

  15. Safety evaluation of synthetic β-carotene

    NARCIS (Netherlands)

    Woutersen, R.A.; Wolterbeek, A.P.M.; Appel, M.J.; Berg, H. van den; Goldbohm, R.A.; Feron, V.J.

    1999-01-01

    The safety of β-carotene was reassessed by evaluating the relevant literature on the beneficial and adverse effects of β-carotene on cancer and, in particular, by evaluating the results of toxicity studies. β- Carotene appeared neither genotoxic nor reprotoxic or teratogenic, and no signs of organ

  16. Environmental Assessment: Waste Tank Safety Program, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-02-01

    The US Department of Energy (DOE) needs to take action in the near-term, to accelerate resolution of waste tank safety issues at the Hanford Site near the City of Richland, Washington, and reduce the risks associated with operations and management of the waste tanks. The DOE has conducted nuclear waste management operations at the Hanford Site for nearly 50 years. Operations have included storage of high-level nuclear waste in 177 underground storage tanks (UST), both in single-shell tank (SST) and double-shell tank configurations. Many of the tanks, and the equipment needed to operate them, are deteriorated. Sixty-seven SSTs are presumed to have leaked a total approximately 3,800,000 liters (1 million gallons) of radioactive waste to the soil. Safety issues associated with the waste have been identified, and include (1) flammable gas generation and episodic release; (2) ferrocyanide-containing wastes; (3) a floating organic solvent layer in Tank 241-C-103; (4) nuclear criticality; (5) toxic vapors; (6) infrastructure upgrades; and (7) interim stabilization of SSTs. Initial actions have been taken in all of these areas; however, much work remains before a full understanding of the tank waste behavior is achieved. The DOE needs to accelerate the resolution of tank safety concerns to reduce the risk of an unanticipated radioactive or chemical release to the environment, while continuing to manage the wastes safely

  17. Resolution of the Hanford site ferrocyanide safety issue

    International Nuclear Information System (INIS)

    Cash, R.J.; Lilga, M.A.; Babad, H.

    1997-01-01

    The Ferrocyanide Safety Issue at the Hanford Site was officially resolved in December 1996. This paper summarizes the key activities that led to final resolution of this safety hazard, a process that began in 1990 after it and other safety concerns were identified for the underground high-level waste storage tanks at the Hanford Site. At the time little was known about ferrocyanide-nitrate/nitrite reactions and their potential to cause offsite releases of radioactivity. The ferrocyanide hazard was a perceived problem, but it took six years of intense studies and analyses of tank samples to prove that the problem no longer exists. The issue revolved around the fact that ferrocyanide and nitrate mixtures can be made to explode violently if concentrated, dry, and heated to temperatures of at least 250 degrees C. The studies conducted over the last six years have shown that the combined effects of temperature, radiation, and pH during 40 or more years of storage have destroyed almost all of the ferrocyanide originally added to tanks. This was shown in laboratory experiments using simulant wastes and confirmed by actual samples taken from the ferrocyanide tanks. The tank waste sludges are now too dilute to support a sustained exothermic reaction, even if dried out and heated to high temperatures. 2 tabs., 18 refs

  18. 78 FR 76391 - Proposed Enhancements to the Motor Carrier Safety Measurement System (SMS) Public Web Site

    Science.gov (United States)

    2013-12-17

    ...-0392] Proposed Enhancements to the Motor Carrier Safety Measurement System (SMS) Public Web Site AGENCY... proposed enhancements to the display of information on the Agency's Safety Measurement System (SMS) public Web site. On December 6, 2013, Advocates [[Page 76392

  19. The Interagency Nuclear Safety Review Panel's Galileo safety evaluation report

    International Nuclear Information System (INIS)

    Nelson, R.C.; Gray, L.B.; Huff, D.A.

    1989-01-01

    The safety evaluation report (SER) for Galileo was prepared by the Interagency Nuclear Safety Review Panel (INSRP) coordinators in accordance with Presidential directive/National Security Council memorandum 25. The INSRP consists of three coordinators appointed by their respective agencies, the Department of Defense, the Department of Energy (DOE), and the National Aeronautics and Space Administration (NASA). These individuals are independent of the program being evaluated and depend on independent experts drawn from the national technical community to serve on the five INSRP subpanels. The Galileo SER is based on input provided by the NASA Galileo Program Office, review and assessment of the final safety analysis report prepared by the Office of Special Applications of the DOE under a memorandum of understanding between NASA and the DOE, as well as other related data and analyses. The SER was prepared for use by the agencies and the Office of Science and Technology Policy, Executive Office of the Present for use in their launch decision-making process. Although more than 20 nuclear-powered space missions have been previously reviewed via the INSRP process, the Galileo review constituted the first review of a nuclear power source associated with launch aboard the Space Transportation System

  20. Site evaluation for the Waste Isolation Pilot Plant (WIPP)

    International Nuclear Information System (INIS)

    Hill, L.R.

    1979-01-01

    Preliminary site selection activities for the WIPP are complete now; these consisted primarily of national and regional studies over the past fifteen years, and resulted in selection of the WIPP study area for geological characterization. The work of geological characterization should be considered to have begun with the drilling of ERDA 9 at the center of the WIPP study area and the initiation of seismic reflection work on the site. That geological characterization, which is primarily oriented to provide specific data concerning the present geology of the site, was virtually complete in December, 1978, when the Geological Characterization Report was submitted to the Department of Energy; much basic information has been gathered indicating no major technical problems with the site as it is now understood. Studies of long-term processes which might affect a repository or have an effect on safety analyses will now be the major geotechnical activity for the WIPP site evaluation team, some of these activities are already underway. These studies will deal with the age of significant features and the rates and processes which produce those features. The information so gained will be useful in increasing the confidence in evaluation of the safety of a repository

  1. Radiological safety evaluation report for NUWAX-79 exercise

    International Nuclear Information System (INIS)

    King, W.C.

    1979-03-01

    An analysis of the radiological safety of the NUWAX-79 exercise to be conducted on the Nevada Test Site in April 1979 is given. An evaluation of the radiological safety to the participants is made using depleted uranium (D-38) in mock weapons parts, and 223 Ra and its daughters as a radioactive contaminant of equipment and terrain. The radiological impact to offsite persons is also discussed, particularly for people living at Lathrop Wells, Nevada, which is located 7 miles south of the site proposed for the exercise. It is the conclusion of this evaluation that the potential radiological risk of this exercise is very low, and that no individual should receive exposure to radioactivity greater than one-tenth of the level permitted under current federal radiation exposure guidelines

  2. Improving the safety of remote site emergency airway management.

    Science.gov (United States)

    Wijesuriya, Julian; Brand, Jonathan

    2014-01-01

    Airway management, particularly in non-theatre settings, is an area of anaesthesia and critical care associated with significant risk of morbidity & mortality, as highlighted during the 4th National Audit Project of the Royal College of Anaesthetists (NAP4). A survey of junior anaesthetists at our hospital highlighted a lack of confidence and perceived lack of safety in emergency airway management, especially in non-theatre settings. We developed and implemented a multifaceted airway package designed to improve the safety of remote site airway management. A Rapid Sequence Induction (RSI) checklist was developed; this was combined with new advanced airway equipment and drugs bags. Additionally, new carbon dioxide detector filters were procured in order to comply with NAP4 monitoring recommendations. The RSI checklists were placed in key locations throughout the hospital and the drugs and advanced airway equipment bags were centralised in the Intensive Care Unit (ICU). It was agreed with the senior nursing staff that an appropriately trained ICU nurse would attend all emergency situations with new airway resources upon request. Departmental guidelines were updated to include details of the new resources and the on-call anaesthetist's responsibilities regarding checks and maintenance. Following our intervention trainees reported higher confidence levels regarding remote site emergency airway management. Nine trusts within the Northern Region were surveyed and we found large variations in the provision of remote site airway management resources. Complications in remote site airway management due lack of available appropriate drugs, equipment or trained staff are potentially life threatening and completely avoidable. Utilising the intervention package an anaesthetist would be able to safely plan and prepare for airway management in any setting. They would subsequently have the drugs, equipment, and trained assistance required to manage any difficulties or complications

  3. Nuclear safety criteria applied in site selection - the practice in France

    International Nuclear Information System (INIS)

    Candes, P.; Aussourd, Ph.

    1975-01-01

    In France, the safety of nuclear facilities is the responsibility of the Ministry for Industry and Research (Central Department for the Safety of Nuclear Facilities). The first part of the paper deals with the conception and contents of the site studies which are included in a safety report with the object of obtaining authorization to go ahead with work on the establishment of a facility. The conception is governed by the following two considerations: (a) the site is a place where the natural elements and living organisms occur and which is characterized by the permanent presence of the human factor, while the proposed nuclear facility will - like any industrial facility - present risks and have an impact on the site, particularly through the discharge of radioactive effluent and potentially in consequence of a nuclear accident; (b) the site exercises an influence - in fact, it even imposes constraints - on the nuclear facility. The site study as submitted by the operators to the authorities responsible for the safety evaluation traditionally consists of six sections, covering: (I) description and history of the site; (II) meteorological conditions; (III) hydrology of the area; (IV) geological and seismological conditions; (V) ecological factors; (VI) natural and/or previous radioactivity at the site. These six sections contain the data which serve as a basis for applying the two considerations spelled out above. However, the two corresponding directions of study and analysis do not settle the fundamental problem of the distribution of the population around the site. Methods for dealing with this problem are suggested in the second part of the paper; they take into account the efforts made so far at the international level. The authors consider that limiting criteria should not be based solely on the radioactive effluent discharges associated with normal operation but on the radioactivity releases associated with accidents. The methods proposed by them constitute

  4. Evaluation and comparison of high population density sites

    International Nuclear Information System (INIS)

    Margulies, T.S.

    1979-10-01

    Consideration of the population distribution surrounding a potential nuclear site generally includes the calculation of population density over a circular area outward to a radial distance of 30 miles from the site. A recently proposed nuclear site Perryman, Maryland challenged the NRC population density guidelines and motivated this project which was performed under the Maryland Power Plant Siting Program. The report provides a comparison of several site population factor indices for comparing relative public safety aspects of alternative nuclear power plant sites. In addition, it is illustrated that use of the reactor safety study (WASH-1400) consequence model as a tool for comparing the relative safety of alternative sites has potential pitfalls

  5. The disposal of Canada's nuclear fuel waste: site screening and site evaluation technology

    International Nuclear Information System (INIS)

    Davison, C.C.; Brown, A.; Everitt, R.A.; Gascoyne, M.; Kozak, E.T.; Lodha, G.S.; Martin, C.D.; Soonawala, N.M.; Stevenson, D.R.; Thorne, G.A.; Whitaker, S.H.

    1994-06-01

    carefully characterized to understand the groundwater flow conditions in the rock. This understanding would be used to situate the disposal vault in the rock so as to allow the flow and chemical characteristics of the groundwater to enhance the safety of the disposal system. The geoscience methods for characterizing the conditions within plutonic rocks of the Canadian Shield have been developed and tested by AECL at geologic research areas on the Shield. This report presents examples of the site characterization methods which are drawn from the studies at these research areas. The geoscience work performed at the Whiteshell Research Area (WRA) on the Shield in southeastern Manitoba comes closest to illustrating the spatial coverage of characterization that would be required for siting an actual nuclear fuel waste disposal vault in a candidate area of the Shield. The characterization work done at the site of the Underground Research Laboratory (URL) in the WRA demonstrates how to evaluate the geoscience conditions of the rock at a candidate disposal site, and illustrates how that information would be used to confirm the suitability of the site for disposal. This report presents evidence from case studies at the URL and the geologic research areas that the surface-based, borehole and underground site characterization methods developed by AECL are now sufficiently developed that they can be used to obtain the geoscience information needed for siting a disposal vault in plutonic rock of the Canadian Shield. We expect that these site characterization methods will continue to be improved and that new methods will be developed during the long time period required for implementation of the disposal project. Improvements and new developments are continuing through ongoing research at the site of the URL and at the other geologic research areas on the Shield. However the methods that are currently available are sufficiently well developed to allow siting to commence. (author)

  6. Problems of nuclear power plant safety evaluation

    International Nuclear Information System (INIS)

    Suchomel, J.

    1977-01-01

    Nuclear power plant safety is discussed with regard to external effects on the containment and to the human factor. As for external effects, attention is focused on shock waves which may be due to explosions or accidents in flammable material transport and storage, to missiles, and to earthquake effects. The criteria for evaluating nuclear power plant safety in different countries are shown. Factors are discussed affecting the reliability of man with regard to his behaviour in a loss-of-coolant accident in the power plant. Different types of PWR containments and their functions are analyzed, mainly in case of accident. Views are discussed on the role of destructive accidents in the overall evaluation of fast reactor safety. Experiences are summed up gained with the operation of WWER reactors with respect to the environmental impact of the nuclear power plants. (Z.M.)

  7. Health, Safety and Environmental Risk Assessment in Laboratory Sites

    Directory of Open Access Journals (Sweden)

    2012-05-01

    Full Text Available Introduction: ”Exposing to danger” or in other words, “risk” is a process which is led to an uncertain result in every field. Project risks are uncertain contingent events or situations that if they occur will have positive or negative effects on project’s objectives. Todays, research and educational process and more complicated and the professional risk management become much more difficult, as a result. .Material and Method: In this research, the health and safety issues have been studied and analyzed using ISO 14121 and the environmental issues by EMEA to determine the risk level separately for research laboratories and to prioritize corrective measure in each field (school. .Result: The finding in this study showed that from all the main risks within the rage of 38-86 percent have been decreased. Moreover average of the risk level for the health, safety and environment cases showed a significant decrease (Pvalue<0.0001 by implement controlling and protective countermeasures compariy to the priority state without any measures. . Conclusion: The risk assessment with hazards control strategy based on ISO 14121 is a compatible method in laboratory site as universities and other reasearch sites.

  8. Safety inspections in construction sites: A systems thinking perspective.

    Science.gov (United States)

    Saurin, Tarcisio Abreu

    2016-08-01

    Although safety inspections carried out by government officers are important for the prevention of accidents, there is little in-depth knowledge on their outcomes and processes leading to these. This research deals with this gap by using systems thinking (ST) as a lens for obtaining insights into safety inspections in construction sites. Thirteen case studies of sites with prohibited works were carried out, discussing how four attributes of ST were used in the inspections. The studies were undertaken over 6 years, and sources of evidence involved participant observation, direct observations, analysis of documents and interviews. Two complementary ways for obtaining insights into inspections, based on ST, were identified: (i) the design of the study itself needs to be in line with ST; and (ii) data collection and analysis should focus on the agents involved in the inspections, the interactions between agents, the constraints and opportunities faced by agents, the outcomes of interactions, and the recommendations for influencing interactions. Copyright © 2015 Elsevier Ltd. All rights reserved.

  9. Criticality Safety Evaluation for the TACS at DAF

    Energy Technology Data Exchange (ETDEWEB)

    Percher, C. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Heinrichs, D. P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2011-06-10

    Hands-on experimental training in the physical behavior of multiplying systems is one of ten key areas of training required for practitioners to become qualified in the discipline of criticality safety as identified in DOE-STD-1135-99, Guidance for Nuclear Criticality Safety Engineer Training and Qualification. This document is a criticality safety evaluation of the training activities and operations associated with HS-3201-P, Nuclear Criticality 4-Day Training Course (Practical). This course was designed to also address the training needs of nuclear criticality safety professionals under the auspices of the NNSA Nuclear Criticality Safety Program1. The hands-on, or laboratory, portion of the course will utilize the Training Assembly for Criticality Safety (TACS) and will be conducted in the Device Assembly Facility (DAF) at the Nevada Nuclear Security Site (NNSS). The training activities will be conducted by Lawrence Livermore National Laboratory following the requirements of an Integrated Work Sheet (IWS) and associated Safety Plan. Students will be allowed to handle the fissile material under the supervision of an LLNL Certified Fissile Material Handler.

  10. Perception of personal safety in urban recreation sites

    Science.gov (United States)

    Herbert W. Schroeder; L.M. Anderson

    1984-01-01

    Photograph of 17 urban recreation sites in Chicago and Atlanta were evaluated by college students (n = 68) in Illinois, Georgia, and Michigan, for either perceived security, scenic quality, or both. For most raters, high visibility and developed park features significantly enhanced perceived security. Scenic quality, on the other hand, was enhanced for the majority of...

  11. Site descriptive modelling - strategy for integrated evaluation

    International Nuclear Information System (INIS)

    Andersson, Johan

    2003-02-01

    The current document establishes the strategy to be used for achieving sufficient integration between disciplines in producing Site Descriptive Models during the Site Investigation stage. The Site Descriptive Model should be a multidisciplinary interpretation of geology, rock mechanics, thermal properties, hydrogeology, hydrogeochemistry, transport properties and ecosystems using site investigation data from deep bore holes and from the surface as input. The modelling comprise the following iterative steps, evaluation of primary data, descriptive and quantitative modelling (in 3D), overall confidence evaluation. Data are first evaluated within each discipline and then the evaluations are checked between the disciplines. Three-dimensional modelling (i.e. estimating the distribution of parameter values in space and its uncertainty) is made in a sequence, where the geometrical framework is taken from the geological model and in turn used by the rock mechanics, thermal and hydrogeological modelling etc. The three-dimensional description should present the parameters with their spatial variability over a relevant and specified scale, with the uncertainty included in this description. Different alternative descriptions may be required. After the individual discipline modelling and uncertainty assessment a phase of overall confidence evaluation follows. Relevant parts of the different modelling teams assess the suggested uncertainties and evaluate the feedback. These discussions should assess overall confidence by, checking that all relevant data are used, checking that information in past model versions is considered, checking that the different kinds of uncertainty are addressed, checking if suggested alternatives make sense and if there is potential for additional alternatives, and by discussing, if appropriate, how additional measurements (i.e. more data) would affect confidence. The findings as well as the modelling results are to be documented in a Site Description

  12. Operational safety evaluation for minor reactor accidents

    International Nuclear Information System (INIS)

    Wang, O.S.

    1981-01-01

    The purpose of this paper is to address a concern of applying conservatism in analysing minor reactor incidents. A so-called ''conservative'' safety analysis may exaggerate the system responses and result in a reactor scram tripped by the reactor protective system (RPS). In reality, a minor incident may lead the reactor to a new thermal hydraulic steady-state without scram, and the mitigation or termination of the incident may entirely depend on operator actions. An example on a small steamline break evaluation for a pressurized water reactor recently investigated by the staff at the Washington Public Power Supply System is presented to illustrate this point. A safety evaluation using mainly the safety-related systems to be consistent with the conservative assumptions used in the Safety Analysis Report was conducted. For comparison, a realistic analysis was also performed using both the safety- and control-related systems. The analyses were performed using the RETRAN plant simulation computer code. The ''conservative'' safety analysis predicts that the incident can be turned over by the RPS scram trips without operator intervention. However, the realistic analysis concludes that the reactor will reach a new steady-state at a different plant thermal hydraulic condition. As a result, the termination of the incident at this stage depends entirely on proper operator action. On the basis of this investigation it is concluded that, for minor incidents, ''conservative'' assumptions are not necessary, sometimes not justifiable. A realistic investigation from the operational safety point of view is more appropriate. It is essential to highlight the key transient indications for specific incident recognition in the operator training program

  13. Evaluating fuel cycle safety for CITa

    International Nuclear Information System (INIS)

    Longhurst, G.R.; Reilly, H.J.; Piet, S.J.

    1987-01-01

    A safety concern in the design of the Compact Ignition Tokamak (CIT) currently being designed in the U. S. is the accidental release of tritium. To evaluate the basis for that concern, an assessment of the risk to the public posed by CIT was conducted that made use of probabilistic risk assessment (PRA) techniques. These include both frequency and consequence elements of risk. This analysis concluded that the tritium systems on the CIT could be designed and operated as planned with negligible safety impact, well within the established guidelines. (author)

  14. Development of the NUMO pre-selection, site-specific safety case

    International Nuclear Information System (INIS)

    Fujiyama, Tetsuo; Suzuki, Satoru; Deguchi, Akira; Umeki, Hiroyuki

    2016-01-01

    Key conclusions: ◆ “The NUMO pre-selection, site-specific safety case” provides the basic structure for subsequent safety cases that will be applied to any selected site, emphasising practical approaches and methodology which will be applicable for the conditions/constraints during an actual siting process. ◆ The preliminary results of the design and safety assessment would underpin the feasibility and safety of geological disposal in Japan.

  15. Safety insights from forensics evaluations at Daiichi

    Directory of Open Access Journals (Sweden)

    J. Rempe

    2017-01-01

    Information obtained from Daiichi is required to inform Decontamination and Decommissioning activities, improving the ability of the Tokyo Electric Power Company (TEPCO to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This paper reports initial results from the US Forensics Effort to utilize examination information obtained by TEPCO to enhance the safety of existing and future nuclear power plant designs. In this paper, three examples are presented in which examination information, such as visual images, dose surveys, sample evaluations, and muon tomography examinations, along with data from plant instrumentation, are used to obtain significant safety insights in the areas of component performance, fission product release and transport, debris end-state location, and combustible gas generation and transport. In addition to reducing uncertainties related to severe accident modeling progression, these insights confirm actions, such as the importance of water addition and containment venting, that are emphasized in updated guidance for severe accident prevention, mitigation, and emergency planning.

  16. The International Criticality Safety Benchmark Evaluation Project

    International Nuclear Information System (INIS)

    Briggs, B. J.; Dean, V. F.; Pesic, M. P.

    2001-01-01

    In order to properly manage the risk of a nuclear criticality accident, it is important to establish the conditions for which such an accident becomes possible for any activity involving fissile material. Only when this information is known is it possible to establish the likelihood of actually achieving such conditions. It is therefore important that criticality safety analysts have confidence in the accuracy of their calculations. Confidence in analytical results can only be gained through comparison of those results with experimental data. The Criticality Safety Benchmark Evaluation Project (CSBEP) was initiated in October of 1992 by the US Department of Energy. The project was managed through the Idaho National Engineering and Environmental Laboratory (INEEL), but involved nationally known criticality safety experts from Los Alamos National Laboratory, Lawrence Livermore National Laboratory, Savannah River Technology Center, Oak Ridge National Laboratory and the Y-12 Plant, Hanford, Argonne National Laboratory, and the Rocky Flats Plant. An International Criticality Safety Data Exchange component was added to the project during 1994 and the project became what is currently known as the International Criticality Safety Benchmark Evaluation Project (ICSBEP). Representatives from the United Kingdom, France, Japan, the Russian Federation, Hungary, Kazakhstan, Korea, Slovenia, Yugoslavia, Spain, and Israel are now participating on the project In December of 1994, the ICSBEP became an official activity of the Organization for Economic Cooperation and Development - Nuclear Energy Agency's (OECD-NEA) Nuclear Science Committee. The United States currently remains the lead country, providing most of the administrative support. The purpose of the ICSBEP is to: (1) identify and evaluate a comprehensive set of critical benchmark data; (2) verify the data, to the extent possible, by reviewing original and subsequently revised documentation, and by talking with the

  17. Software Dependability and Safety Evaluations ESA's Initiative

    Science.gov (United States)

    Hernek, M.

    ESA has allocated funds for an initiative to evaluate Dependability and Safety methods of Software. The objectives of this initiative are; · More extensive validation of Safety and Dependability techniques for Software · Provide valuable results to improve the quality of the Software thus promoting the application of Dependability and Safety methods and techniques. ESA space systems are being developed according to defined PA requirement specifications. These requirements may be implemented through various design concepts, e.g. redundancy, diversity etc. varying from project to project. Analysis methods (FMECA. FTA, HA, etc) are frequently used during requirements analysis and design activities to assure the correct implementation of system PA requirements. The criticality level of failures, functions and systems is determined and by doing that the critical sub-systems are identified, on which dependability and safety techniques are to be applied during development. Proper performance of the software development requires the development of a technical specification for the products at the beginning of the life cycle. Such technical specification comprises both functional and non-functional requirements. These non-functional requirements address characteristics of the product such as quality, dependability, safety and maintainability. Software in space systems is more and more used in critical functions. Also the trend towards more frequent use of COTS and reusable components pose new difficulties in terms of assuring reliable and safe systems. Because of this, its dependability and safety must be carefully analysed. ESA identified and documented techniques, methods and procedures to ensure that software dependability and safety requirements are specified and taken into account during the design and development of a software system and to verify/validate that the implemented software systems comply with these requirements [R1].

  18. Nuclear safety culture evaluation model based on SSE-CMM

    International Nuclear Information System (INIS)

    Yang Xiaohua; Liu Zhenghai; Liu Zhiming; Wan Yaping; Peng Guojian

    2012-01-01

    Safety culture, which is of great significance to establish safety objectives, characterizes level of enterprise safety production and development. Traditional safety culture evaluation models emphasis on thinking and behavior of individual and organization, and pay attention to evaluation results while ignore process. Moreover, determining evaluation indicators lacks objective evidence. A novel multidimensional safety culture evaluation model, which has scientific and completeness, is addressed by building an preliminary mapping between safety culture and SSE-CMM's (Systems Security Engineering Capability Maturity Model) process area and generic practice. The model focuses on enterprise system security engineering process evaluation and provides new ideas and scientific evidences for the study of safety culture. (authors)

  19. Gasbuggy Site Assessment and Risk Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-03-01

    This report describes the geologic and hydrologic conditions and evaluates potential health risks to workers in the natural gas industry in the vicinity of the Gasbuggy, New Mexico, site, where the U.S. Atomic Energy Commission detonated an underground nuclear device in 1967. The 29-kiloton detonation took place 4,240 feet below ground surface and was designed to evaluate the use of a nuclear detonation to enhance natural gas production from the Pictured Cliffs Formation in the San Juan Basin, Rio Arriba County, New Mexico, on land administered by Carson National Forest. A site-specific conceptual model was developed based on current understanding of the hydrologic and geologic environment. This conceptual model was used for establishing plausible contaminant exposure scenarios, which were then evaluated for human health risk potential. The most mobile and, therefore, the most probable contaminant that could result in human exposure is tritium. Natural gas production wells were identified as having the greatest potential for bringing detonation-derived contaminants (tritium) to the ground surface in the form of tritiated produced water. Three exposure scenarios addressing potential contamination from gas wells were considered in the risk evaluation: a gas well worker during gas-well-drilling operations, a gas well worker performing routine maintenance, and a residential exposure. The residential exposure scenario was evaluated only for comparison; permanent residences on national forest lands at the Gasbuggy site are prohibited

  20. Model summary report for the safety assessment SR-Site

    International Nuclear Information System (INIS)

    Vahlund, Fredrik; Zetterstroem Evins, Lena; Lindgren, Maria

    2010-12-01

    This document is the model summary report for the safety assessment SR-Site. In the report, the quality assurance (QA) measures conducted for assessment codes are presented together with the chosen QA methodology. In the safety assessment project SR-Site, a large number of numerical models are used to analyse the system and to show compliance. In order to better understand how the different models interact and how information are transferred between the different models Assessment Model Flowcharts, AMFs, are used. From these, different modelling tasks can be identify and the computer codes used. As a large number of computer codes are used in the assessment the complexity of these differs to a large extent, some of the codes are commercial while others are developed especially for the assessment at hand. QA requirements must on the one hand take this diversity into account and on the other hand be well defined. In the methodology section of the report the following requirements are defined for all codes: - It must be demonstrated that the code is suitable for its purpose. - It must be demonstrated that the code has been properly used. - It must be demonstrated that the code development process has followed appropriate procedures and that the code produces accurate results. - It must be described how data are transferred between the different computational tasks. Although the requirements are identical for all codes in the assessment, the measures used to show that the requirements are fulfilled will be different for different types of codes (for instance due to the fact that for some software the source-code is not available for review). Subsequent to the methodology section, each assessment code is presented together with a discussion on how the requirements are met

  1. Model summary report for the safety assessment SR-Site

    Energy Technology Data Exchange (ETDEWEB)

    Vahlund, Fredrik; Zetterstroem Evins, Lena (Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden)); Lindgren, Maria (Kemakta Konsult AB, Stockholm (Sweden))

    2010-12-15

    This document is the model summary report for the safety assessment SR-Site. In the report, the quality assurance (QA) measures conducted for assessment codes are presented together with the chosen QA methodology. In the safety assessment project SR-Site, a large number of numerical models are used to analyse the system and to show compliance. In order to better understand how the different models interact and how information are transferred between the different models Assessment Model Flowcharts, AMFs, are used. From these, different modelling tasks can be identify and the computer codes used. As a large number of computer codes are used in the assessment the complexity of these differs to a large extent, some of the codes are commercial while others are developed especially for the assessment at hand. QA requirements must on the one hand take this diversity into account and on the other hand be well defined. In the methodology section of the report the following requirements are defined for all codes: - It must be demonstrated that the code is suitable for its purpose. - It must be demonstrated that the code has been properly used. - It must be demonstrated that the code development process has followed appropriate procedures and that the code produces accurate results. - It must be described how data are transferred between the different computational tasks. Although the requirements are identical for all codes in the assessment, the measures used to show that the requirements are fulfilled will be different for different types of codes (for instance due to the fact that for some software the source-code is not available for review). Subsequent to the methodology section, each assessment code is presented together with a discussion on how the requirements are met

  2. Usability Evaluation of Public Web Mapping Sites

    Science.gov (United States)

    Wang, C.

    2014-04-01

    Web mapping sites are interactive maps that are accessed via Webpages. With the rapid development of Internet and Geographic Information System (GIS) field, public web mapping sites are not foreign to people. Nowadays, people use these web mapping sites for various reasons, in that increasing maps and related map services of web mapping sites are freely available for end users. Thus, increased users of web mapping sites led to more usability studies. Usability Engineering (UE), for instance, is an approach for analyzing and improving the usability of websites through examining and evaluating an interface. In this research, UE method was employed to explore usability problems of four public web mapping sites, analyze the problems quantitatively and provide guidelines for future design based on the test results. Firstly, the development progress for usability studies were described, and simultaneously several usability evaluation methods such as Usability Engineering (UE), User-Centered Design (UCD) and Human-Computer Interaction (HCI) were generally introduced. Then the method and procedure of experiments for the usability test were presented in detail. In this usability evaluation experiment, four public web mapping sites (Google Maps, Bing maps, Mapquest, Yahoo Maps) were chosen as the testing websites. And 42 people, who having different GIS skills (test users or experts), gender (male or female), age and nationality, participated in this test to complete the several test tasks in different teams. The test comprised three parts: a pretest background information questionnaire, several test tasks for quantitative statistics and progress analysis, and a posttest questionnaire. The pretest and posttest questionnaires focused on gaining the verbal explanation of their actions qualitatively. And the design for test tasks targeted at gathering quantitative data for the errors and problems of the websites. Then, the results mainly from the test part were analyzed. The

  3. Audit Report The Procurement of Safety Class/Safety-Significant Items at the Savannah River Site

    International Nuclear Information System (INIS)

    2009-01-01

    The Department of Energy operates several nuclear facilities at its Savannah River Site, and several additional facilities are under construction. This includes the National Nuclear Security Administration's Tritium Extraction Facility (TEF) which is designated to help maintain the reliability of the U.S. nuclear stockpile. The Mixed Oxide Fuel Fabrication Facility (MOX Facility) is being constructed to manufacture commercial nuclear reactor fuel assemblies from weapon-grade plutonium oxide and depleted uranium. The Interim Salt Processing (ISP) project, managed by the Office of Environmental Management, will treat radioactive waste. The Department has committed to procuring products and services for nuclear-related activities that meet or exceed recognized quality assurance standards. Such standards help to ensure the safety and performance of these facilities. To that end, it issued Departmental Order 414.1C, Quality Assurance (QA Order). The QA Order requires the application of Quality Assurance Requirements for Nuclear Facility Applications (NQA-1) for nuclear-related activities. The NQA-1 standard provides requirements and guidelines for the establishment and execution of quality assurance programs during the siting, design, construction, operation, and decommissioning of nuclear facilities. These requirements, promulgated by the American Society of Mechanical Engineers, must be applied to 'safety-class' and 'safety-significant' structures, systems and components (SSCs). Safety-class SSCs are defined as those necessary to prevent exposure off site and to protect the public. Safety-significant SSCs are those whose failure could irreversibly impact worker safety such as a fatality, serious injury, or significant radiological or chemical exposure. Due to the importance of protecting the public, workers, and environment, we initiated an audit to determine whether the Department of Energy procured safety-class and safety-significant SSCs that met NQA-1 standards at

  4. 78 FR 48468 - Delphi Corporation, Electronics and Safety Division, Including On-Site Leased Workers From...

    Science.gov (United States)

    2013-08-08

    ..., Electronics and Safety Division, Including On-Site Leased Workers From Securitas, Bartech, Flint Janitorial... Adjustment Assistance on May 20, 2013, applicable to workers of Delphi Corporation, Electronics and Safety... on- site at the Flint, Michigan location of Delphi Corporation, Electronics and Safety Division. The...

  5. Evaluation of the suitability of the WIPP site

    International Nuclear Information System (INIS)

    Neill, R.H.; Channell, J.K.; Chaturvedi, L.; Little, M.S.; Rehfeldt, K.; Spiegler, P.

    1983-05-01

    Determination of the suitability of the site for WIPP is only the first major phase in the evaluation of the radiological impact of the repository on the public health and safety. The Environmental Evaluation Group (EEG) will continue to independently review the design of the facility, the operational procedures, the criteria for packaging and shipment of the waste, the plans, procedures and results of the WIPP experiments, emergency preparedness, adherence to EPA and pertinent NRC regulations, and other important features of the project. EEG has concluded from existing evidence that the Los Medanos site for the WIPP project has been characterized in sufficient detail to warrant confidence in the validation of the site for the permanent emplacement of approximately 6 million cubic feet of defense transuranic waste. This conclusion is based on the assumption that the maximum surface dose rate for the unshielded remote-handled transuranic waste canisters will be 100 rem/hr with a maximum radionuclide concentration of 23 Ci/liter. The Site and Preliminary Design Validation program, through the drilling of two shafts to the selected repository level at 2160 ft below the surface and excavation of about 9000 ft of tunnels, has confirmed the interpretations made about the subsurface geological conditions at the site. For an assessment of the potential radiation effects of the nuclear waste repository on the public health and safety, it is necessary to understand the regional geological and hydrological setting. Much work has been done to understand these conditions and to address several specific issues which have arisen as a result of such studies. However, it is almost inevitable that some questions remain unanswered at a given time in the decision-making process. EEG has identified work which still needs to be done at the Los Medanos site in order to improve confidence in the worst case scenario models of possible breaches of the repository

  6. Evaluation of BOR-60 operation safety

    International Nuclear Information System (INIS)

    Minakov, A.A.; Antipin, G.K.; Efimov, V.N.; Kuzin, G.G.; Eschenko, L.V.; Eschenko, S.N.

    1987-12-01

    In this communication, BOR-60 reactor operation anomalies capable to produce a dangerous overheating of the core (SDC) is examined. On bases of calculations and reactor operation experience an event tree for SDC is built. Evaluations of probable anomalies entering in the event tree and reactor parameters modifications in case of anomalies are presented. In conclusion BOR-60 agree with the sovietic nuclear safety [fr

  7. Safety evaluation status report for the prototype license application safety analysis report

    International Nuclear Information System (INIS)

    1989-07-01

    The US Nuclear Regulatory Commission (NRC) staff and consultants reviewed a Prototype License Application Safety Analysis Report (PLASAR) submitted by the US Department of Energy (DOE) for the earth-mounded concrete bunker (EMCB) alternative method of low-level radioactive waste disposal. The NRC reviewers relied extensively on the Standard Review Plan (SRP), Rev.1 (NUREG-1200), to evaluate the acceptability of the information provided in the EMCB PLASAR. The NRC staff selected certain review areas in the PLASAR for development of safety evaluation report input to provide examples of safety assessments that are necessary as part of a licensing review. Because of the fictitious nature of the assumed disposal site, and the decision to limit the review to essentially first-round review status, the NRC staff report is labeled a ''Safety Evaluation Status Report'' (SESR). Appendix A comprises the NRC review comments and questions on the information that DOE submitted in the PLASAR. The NRC concentrated its review on the design and operations-related portions of the EMCB PLASAR

  8. Gasbuggy Site Assessment and Risk Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-03-01

    The Gasbuggy site is in northern New Mexico in the San Juan Basin, Rio Arriba County (Figure 1-1). The Gasbuggy experiment was designed to evaluate the use of a nuclear detonation to enhance natural gas production from the Pictured Cliffs Formation, a tight, gas-bearing sandstone formation. The 29-kiloton-yield nuclear device was placed in a 17.5-inch wellbore at 4,240 feet (ft) below ground surface (bgs), approximately 40 ft below the Pictured Cliffs/Lewis shale contact, in an attempt to force the cavity/chimney formed by the detonation up into the Pictured Cliffs Sandstone. The test was conducted below the southwest quarter of Section 36, Township 29 North, Range 4 West, New Mexico Principal Meridian. The device was detonated on December 10, 1967, creating a 335-ft-high chimney above the detonation point and a cavity 160 ft in diameter. The gas produced from GB-ER (the emplacement and reentry well) during the post-detonation production tests was radioactive and diluted, primarily by carbon dioxide. After 2 years, the energy content of the gas had recovered to 80 percent of the value of gas in conventionally developed wells in the area. There is currently no technology capable of remediating deep underground nuclear detonation cavities and chimneys. Consequently, the U.S. Department of Energy (DOE) must continue to manage the Gasbuggy site to ensure that no inadvertent intrusion into the residual contamination occurs. DOE has complete control over the 1/4 section (160 acres) containing the shot cavity, and no drilling is permitted on that property. However, oil and gas leases are on the surrounding land. Therefore, the most likely route of intrusion and potential exposure would be through contaminated natural gas or contaminated water migrating into a producing natural gas well outside the immediate vicinity of ground zero. The purpose of this report is to describe the current site conditions and evaluate the potential health risks posed by the most plausible

  9. Safety evaluation of cation-exchange resins

    International Nuclear Information System (INIS)

    Kalkwarf, D.R.

    1977-08-01

    Results are presented of a study to evaluate whether sufficient information is available to establish conservative limits for the safe use of cation-exchange resins in separating radionuclides and, if not, to recommend what new data should be acquired. The study was also an attempt to identify in-line analytical techniques for the evaluation of resin degradation during radionuclide processing. The report is based upon a review of the published literature and upon discussions with many people engaged in the use of these resins. It was concluded that the chief hazard in the use of cation-exchange resins for separating radionuclides is a thermal explosion if nitric acid or other strong oxidants are present in the process solution. Thermal explosions can be avoided by limiting process parameters so that the rates of heat and gas generation in the system do not exceed the rates for their transfer to the surroundings. Such parameters include temperature, oxidant concentration, the amounts of possible catalysts, the radiation dose absorbed by the resin and the diameter of the resin column. Current information is not sufficient to define safe upper limits for these parameters. They can be evaluated, however, from equations derived from the Frank-Kamenetskii theory of thermal explosions provided the heat capacities, thermal conductivities and rates of heat evolution in the relevant resin-oxidant mixtures are known. It is recommended that such measurements be made and the appropriate limits be evaluated. A list of additional safety precautions are also presented to aid in the application of these limits and to provide additional margins of safety. In-line evaluation of resin degradation to assess its safety hazard is considered impractical. Rather, it is recommended that the resin be removed from use before it has received the limiting radiation dose, evaluated as described above

  10. Manual on quality assurance for the survey, evaluation and confirmation of nuclear power plant sites

    International Nuclear Information System (INIS)

    1987-04-01

    The present Manual on Quality Assurance for the Survey, Evaluation and Confirmation of Nuclear Power Plant Sites contains supporting material and illustrates examples for implementing the requirements contained in the Code of Practice on Quality Assurance for Safety in Nuclear Power Plants to the activities of survey, evaluation and confirmation of nuclear power plant sites. At the same time the Code of Practice for Safety in Nuclear Power Plant Siting, and Safety Guides in the siting series contain requirements and recommendations to implement a quality assurance programme in selected activities of the siting process. This manual is intended to provide guidance and illustrate examples on this implementation. During preparation and reviews of this Manual it was found out that the methodology of implementation of the quality assurance programme in siting activities is still under development. For these reasons it was considered appropriate to publish this Manual as a temporary publication for trial use

  11. NAGRA - Sites for geological repositories - Technical safety factors: Suggestions for stage 3

    International Nuclear Information System (INIS)

    2015-01-01

    This comprehensive brochure published by the Swiss National Cooperative for the Disposal of Radioactive Waste (NAGRA) examines the six sites for repositories for nuclear wastes in Switzerland which have been proposed in Stage 1 of the program concerning nuclear waste repositories. Three of these sites are proposed for both highly radioactive wastes as well as for low and medium-active wastes, the other three for low and medium-active wastes only. The evaluation of the sites is discussed. The sites are to be further evaluated in Stage 2 of the program. The work to be done in the further stages involved in the selection of the final site (or sites) is described. Along with definition of the regions where deep repositories could possibly be built, suggestions for the placing of the facilities required on the surface are discussed. Geological requirements on the repositories and safety-relevant characteristics of the various site options are discussed. The results of the assessments made are presented in tabular form. Maps and geological cross-sections of all the suggested areas are included

  12. Determining Safety Inspection Thresholds for Employee Incentives Programs on Construction Sites.

    Science.gov (United States)

    Sparer, Emily; Dennerlein, Jack

    2013-01-01

    The goal of this project was to evaluate approaches of determining the numerical value of a safety inspection score that would activate a reward in an employee safety incentive program. Safety inspections are a reflection of the physical working conditions at a construction site and provide a safety score that can be used in incentive programs to reward workers. Yet it is unclear what level of safety should be used when implementing this kind of program. This study explored five ways of grouping safety inspection data collected during 19 months at Harvard University-owned construction projects. Each approach grouped the data by one of the following: owner, general contractor, project, trade, or subcontractor. The median value for each grouping provided the threshold score. These five approaches were then applied to data from a completed project in order to calculate the frequency and distribution of rewards in a monthly safety incentive program. The application of each approach was evaluated qualitatively for consistency, competitiveness, attainability, and fairness. The owner-specific approach resulted in a threshold score of 96.3% and met all of the qualitative evaluation goals. It had the most competitive reward distribution (only 1/3 of the project duration) yet it was also attainable. By treating all workers equally and maintaining the same value throughout the project duration, this approach was fair and consistent. The owner-based approach for threshold determination can be used by owners or general contractors when creating leading indicator incentives programs and by researchers in future studies on incentive program effectiveness.

  13. Transport properties site descriptive model. Guidelines for evaluation and modelling

    International Nuclear Information System (INIS)

    Berglund, Sten; Selroos, Jan-Olof

    2004-04-01

    This report describes a strategy for the development of Transport Properties Site Descriptive Models within the SKB Site Investigation programme. Similar reports have been produced for the other disciplines in the site descriptive modelling (Geology, Hydrogeology, Hydrogeochemistry, Rock mechanics, Thermal properties, and Surface ecosystems). These reports are intended to guide the site descriptive modelling, but also to provide the authorities with an overview of modelling work that will be performed. The site descriptive modelling of transport properties is presented in this report and in the associated 'Strategy for the use of laboratory methods in the site investigations programme for the transport properties of the rock', which describes laboratory measurements and data evaluations. Specifically, the objectives of the present report are to: Present a description that gives an overview of the strategy for developing Site Descriptive Models, and which sets the transport modelling into this general context. Provide a structure for developing Transport Properties Site Descriptive Models that facilitates efficient modelling and comparisons between different sites. Provide guidelines on specific modelling issues where methodological consistency is judged to be of special importance, or where there is no general consensus on the modelling approach. The objectives of the site descriptive modelling process and the resulting Transport Properties Site Descriptive Models are to: Provide transport parameters for Safety Assessment. Describe the geoscientific basis for the transport model, including the qualitative and quantitative data that are of importance for the assessment of uncertainties and confidence in the transport description, and for the understanding of the processes at the sites. Provide transport parameters for use within other discipline-specific programmes. Contribute to the integrated evaluation of the investigated sites. The site descriptive modelling of

  14. 21 CFR 315.6 - Evaluation of safety.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Evaluation of safety. 315.6 Section 315.6 Food and... USE DIAGNOSTIC RADIOPHARMACEUTICALS § 315.6 Evaluation of safety. (a) Factors considered in the safety...)(1) To establish the safety of a diagnostic radiopharmaceutical, FDA may require, among other...

  15. Multinational Design Evaluation Programme (MDEP) - Safety Goals

    International Nuclear Information System (INIS)

    Vaughan, G.J.

    2011-01-01

    One of the aims of the NEA's Multinational Design Evaluation Programme (MDEP) is to work towards greater harmonisation of regulatory requirements. To achieve this aim, it is necessary that there is a degree of convergence on the safety goals that are required to be met by designers and operators. The term 'safety goals' is defined to cover all health and safety requirements which must be met: these may be deterministic rules and/or probabilistic targets. They should cover the safety of workers, public and the environment in line with the IAEA's Basic Safety Objective; encompassing safety in normal operation through to severe accidents. MDEP is also interested in how its work can be extended to future reactors, which may use significantly different technology to the almost ubiquitous LWRs used today and in the next generation, building on the close co-operation within MDEP between the regulators who are currently engaged in constructing or carrying out design reviews on new designs. For two designs this work has involved several regulators sharing their safety assessments and in some cases issuing statements on issues that need to be addressed. Work is also progressing towards joint regulatory position statements on specific assessment areas. Harmonisation of safety goals will enhance the cooperation between regulators as further developments in design and technology occur. All regulators have safety goals, but these are expressed in many different ways and exercises in comparing them frequently are done at a very low level eg specific temperatures in the reactor vessel of a specific reactor type. The differences in the requirements from different regulators are difficult to resolve as the goals are derived using different principles and assumptions and are often for a specific technology. Therefore a different approach is being investigated, starting with the top-level safety goals and try to derive a structure and means of deriving lower tier

  16. Volcanic Hazards in Site Evaluation for Nuclear Installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-10-15

    This publication provides comprehensive and updated guidance for site evaluation in relation to volcanic hazards. It includes recommendations on assessing the volcanic hazards at a nuclear installation site, in order to identify and characterize, in a comprehensive manner, all potentially hazardous phenomena that may be associated with future volcanic events. It describes how some of these volcanic phenomena may affect the acceptability of the selected site, resulting in exclusion of a site or determining the corresponding design basis parameters for the installation. This Safety Guide is applicable to both existing and new sites, and a graded approach is recommended to cater for all types of nuclear installations. Contents: 1. Introduction; 2. Overview of volcanic hazard assessment; 3. General recommendations; 4. Necessary information and investigations (database); 5. Screening of volcanic hazards; 6. Site specific volcanic hazard assessment; 7. Nuclear installations other than nuclear power plants; 8. Monitoring and preparation for response; 9. Management system for volcanic hazard assessment; Annex I: Volcanic hazard scenarios; Annex II: Worldwide sources of information.

  17. Real-time safety risk assessment based on a real-time location system for hydropower construction sites.

    Science.gov (United States)

    Jiang, Hanchen; Lin, Peng; Fan, Qixiang; Qiang, Maoshan

    2014-01-01

    The concern for workers' safety in construction industry is reflected in many studies focusing on static safety risk identification and assessment. However, studies on real-time safety risk assessment aimed at reducing uncertainty and supporting quick response are rare. A method for real-time safety risk assessment (RTSRA) to implement a dynamic evaluation of worker safety states on construction site has been proposed in this paper. The method provides construction managers who are in charge of safety with more abundant information to reduce the uncertainty of the site. A quantitative calculation formula, integrating the influence of static and dynamic hazards and that of safety supervisors, is established to link the safety risk of workers with the locations of on-site assets. By employing the hidden Markov model (HMM), the RTSRA provides a mechanism for processing location data provided by the real-time location system (RTLS) and analyzing the probability distributions of different states in terms of false positives and negatives. Simulation analysis demonstrated the logic of the proposed method and how it works. Application case shows that the proposed RTSRA is both feasible and effective in managing construction project safety concerns.

  18. A probabilistic bridge safety evaluation against floods.

    Science.gov (United States)

    Liao, Kuo-Wei; Muto, Yasunori; Chen, Wei-Lun; Wu, Bang-Ho

    2016-01-01

    To further capture the influences of uncertain factors on river bridge safety evaluation, a probabilistic approach is adopted. Because this is a systematic and nonlinear problem, MPP-based reliability analyses are not suitable. A sampling approach such as a Monte Carlo simulation (MCS) or importance sampling is often adopted. To enhance the efficiency of the sampling approach, this study utilizes Bayesian least squares support vector machines to construct a response surface followed by an MCS, providing a more precise safety index. Although there are several factors impacting the flood-resistant reliability of a bridge, previous experiences and studies show that the reliability of the bridge itself plays a key role. Thus, the goal of this study is to analyze the system reliability of a selected bridge that includes five limit states. The random variables considered here include the water surface elevation, water velocity, local scour depth, soil property and wind load. Because the first three variables are deeply affected by river hydraulics, a probabilistic HEC-RAS-based simulation is performed to capture the uncertainties in those random variables. The accuracy and variation of our solutions are confirmed by a direct MCS to ensure the applicability of the proposed approach. The results of a numerical example indicate that the proposed approach can efficiently provide an accurate bridge safety evaluation and maintain satisfactory variation.

  19. Quantitative Evaluation of Nuclear Power Station Siting from the Point of View of Safety; Evaluacion Cuantitativa del Emplazamiento de Centrales Nucleoelectricas desde el Punto de Vista de la Seguridad

    Energy Technology Data Exchange (ETDEWEB)

    Serment Cabrero, V. [Comision Nacional de Energia Nuclear y Universidad Nacional Autonomia de Mexico (Mexico); Velez, C. [Instituto Politecnico Nacional y Comision Federal de Electricidad (Mexico)

    1967-09-15

    Apart from the minimum operational and safety requirements for the siting of nuclear power stations, the paper proposes introducing the total mean dose to the general population as an additional criterion. Although the calculation of this dose presupposes a detailed knowledge of the main pathways by which the population may be irradiated in case of an accident, the present state of power reactor technology makes it possible to tackle the problem already. An estimate of the total mean dose per unit time involves the safety aspects of the reactor, the features of the site considered, and the way in which these features affect safety. The authors derive the general formula expressing the total mean dose as a function of all the parameters concerned. It is pointed out that in the case of accidents in which the release of fission products is independent of the mechanisms of irradiation, this formula is considerably simplified and makes it possible to establish a classification of the relative suitability, from the safety point of view, of the sites proposed, without touching upon the difficult problem of the definition of accidents and their probabilities of occurrence. A further simplification accrues when there exist predominant mechanisms governing the accidental irradiation of the population. The approach adopted is particularly well suited to calculations with digital computers, and helps to identify the areas in which information is lacking and to direct research intended to remove these deficiencies. (author) [Spanish] Ademas de los requisitos mfnimos opecacionales y de seguridad para el emplazamiento de centrales nucleoelectricas, se sugiere utilizar como criterio adicional la dosis total promedio a la poblacion. Aunque el calculo de esa dosis implica el conocimiento detallado de los caminos principales por los cuales la poblacion puede ser irradiada en el caso de un accidente, el estado actual de la tecnologia de los reactores nucleares de potencia permite ya

  20. Barrier performance researches for the safety evaluation

    International Nuclear Information System (INIS)

    Niibori, Yuichi

    2004-01-01

    So far, many researches were conducted to propose a scientific evidence (a safety case) for the realization of geological disposal in Japan. In order to regulate the geological disposal system of radioactive wastes, on the other hand, we need also a holistic approach to integrate various data related for the performance evaluations of the engineered barrier system and the natural barrier system. However, the scientific bases are not sufficient to establish the safety regulation for such a natural system. For example, we often apply the specific probability density function (PDF) to the uncertainty of barrier system due to the essential heterogeneity. However, the applicability is not clear in the regulation point of view. A viewpoint to understand such an applicability of PDFs has been presented. (author)

  1. Health and safety consequences of medical isotope processing at the Hanford Site 325 building

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, D. L.

    1997-11-19

    Potential activities associated with medical isotope processing at the Hanford Site 325 Building laboratory and hot cell facilities are evaluated to assess the health and safety consequences if these activities are to be implemented as part of a combined tritium and medical isotope production mission for the Fast Flux Text Facility (FFTF). The types of activities included in this analysis are unloading irradiated isotope production assemblies at the 325 Building, recovery and dissolution of the target materials, separation of the product isotopes as required, and preparation of the isotopes for shipment to commercial distributors who supply isotopes to the medical conunuriity. Possible consequences to members of the public and to workers from both radiological and non-radiological hazards are considered in this evaluation. Section 2 of this docinnent describes the assumptions and methods used for the health and safety consequences analysis, section 3 presents the results of the analysis, and section 4 summarizes the results and conclusions from the analysis.

  2. Risk evaluation of remedial alternatives for the Hanford Site

    International Nuclear Information System (INIS)

    Clark, S.W.; Lane, N.K.; Swenson, L.

    1994-01-01

    Risk assessment is one of the many tools used to evaluate and select remedial alternatives and evaluate the risk associated with selected remedial alternatives during and after implementation. The risk evaluation of remedial alternatives (RERA) is performed to ensure selected alternatives are protective of human health and the environment. Final remedy selection is promulgated in a record of decision (ROD) and risks of the selected alternatives are documented. Included in the ROD documentation are the risk-related analyses for long-term effectiveness, short-term effectiveness, and overall protection of human health and the environment including how a remedy will eliminate, reduce or control risks and whether exposure will be reduced to acceptable levels. A major goal of RERA in the process leading to a ROD is to provide decision-makers with specific risk information that may be needed to choose among alternatives. For the Hanford Site, there are many considerations that must be addressed from a risk perspective. These include the large size of the Hanford Site, the presence of both chemical and radionuclide contamination, one likelihood of many analogues sites, public and worker health and safety, and stakeholder concern with ecological impacts from site contamination and remedial actions. A RERA methodology has been promulgated to (1) identify the points in the process leading to a ROD where risk assessment input is either required or desirable and (2) provide guidance on how to evaluate risks associated with remedial alternatives under consideration. The methodology and evaluations parallel EPA guidance requiring consideration of short-term impacts and the overall protectiveness of remedial actions for evaluating potential human health and ecological risks during selection of remedial alternatives, implementation of remedial measures, and following completion of remedial action

  3. Safety evaluation for packaging CPC metal boxes

    International Nuclear Information System (INIS)

    Romano, T.

    1995-01-01

    This Safety Evaluation for Packaging (SEP) provides authorization for the use of Container Products Corporation (CPC) metal boxes, as described in this document, for the interarea shipment of radioactive contaminated equipment and debris for storage in the Central Waste Complex (CWC) or T Plant located in the 200 West Area. Authorization is granted until November 30, 1995. The CPC boxes included in this SEP were originally procured as US Department of Transportation (DOT) Specification 7A Type A boxes. A review of the documentation provided by the manufacturer revealed the documentation did not adequately demonstrate compliance to the 4 ft drop test requirement of 49 CFR 173.465(c). Preparation of a SEP is necessary to document the equivalent safety of the onsite shipment in lieu of meeting DOT packaging requirements until adequate documentation is received. The equivalent safety of the shipment is based on the fact that the radioactive contents consist of contaminated equipment and debris which are not dispersible. Each piece is wrapped in two layers of no less than 4 mil plastic prior to being placed in the box which has an additional 10 mil liner. Pointed objects and sharp edges are padded to prevent puncture of the plastic liner and wrapping

  4. Safety assessment for a KBS-3H spent nuclear fuel repository at Olkiluoto. Complementary evaluations of safety

    International Nuclear Information System (INIS)

    Neall, Fiona; Pastina, Barbara; Snellman, Margit; Smith, Paul; Gribi, P.; Johnson, Lawrence

    2008-12-01

    The KBS-3H design is a variant of the more general KBS-3 method for the geological disposal of spent nuclear fuel in Finland and Sweden. In the KBS-3H design, multiple assemblies containing spent fuel are emplaced horizontally in parallel, approximately 300 m long, slightly inclined deposition drifts. The copper canisters, each with a surrounding layer of bentonite clay, are placed in perforated steel shells prior to deposition in the drifts; the assembly is called the 'supercontainer'. The other KBS-3 variant is the KBS-3V design, in which the copper canisters are emplaced vertically in individual deposition holes surrounded by bentonite clay but without steel supercontainer shells. SKB and Posiva have conducted a Research, Development and Demonstration programme over the period 2002-2007 with the overall aim of establishing whether KBS-3H represents a feasible alternative to KBS-3V. As part of this programme, the long-term safety of a KBS-3H repository has been assessed in the KBS-3H safety studies. In order to focus the safety studies, the Olkiluoto site in the municipality of Eurajoki, which is the proposed site for a spent fuel repository in Finland, was used as a hypothetical site for a KBS-3H repository. The present report is part of a portfolio of reports discussing the long-term safety of the KBS-3H repository. The overall outcome of the KBS-3H safety studies is documented in the summary report, 'Safety assessment for a KBS-3H repository for spent nuclear fuel at Olkiluoto'. The purpose and scope of the KBS-3H complementary evaluations of safety report is provided in Posiva's Safety Case Plan, which is based on Regulatory Guide YVL 8.4 and on international guidelines on complementary lines of argument to long-term safety that are considered an important element of a post-closure safety case for geological repositories. Complementary evaluations of safety require the use of evaluations, evidence and qualitative supporting arguments that lie outside the

  5. Safety assessment for a KBS-3H spent nuclear fuel repository at Olkiluoto. Complementary evaluations of safety

    Energy Technology Data Exchange (ETDEWEB)

    Neall, Fiona; Pastina, Barbara; Snellman, Margit; Smith, Paul; Gribi, P.; Johnson, Lawrence

    2008-12-15

    The KBS-3H design is a variant of the more general KBS-3 method for the geological disposal of spent nuclear fuel in Finland and Sweden. In the KBS-3H design, multiple assemblies containing spent fuel are emplaced horizontally in parallel, approximately 300 m long, slightly inclined deposition drifts. The copper canisters, each with a surrounding layer of bentonite clay, are placed in perforated steel shells prior to deposition in the drifts; the assembly is called the 'supercontainer'. The other KBS-3 variant is the KBS-3V design, in which the copper canisters are emplaced vertically in individual deposition holes surrounded by bentonite clay but without steel supercontainer shells. SKB and Posiva have conducted a Research, Development and Demonstration programme over the period 2002-2007 with the overall aim of establishing whether KBS-3H represents a feasible alternative to KBS-3V. As part of this programme, the long-term safety of a KBS-3H repository has been assessed in the KBS-3H safety studies. In order to focus the safety studies, the Olkiluoto site in the municipality of Eurajoki, which is the proposed site for a spent fuel repository in Finland, was used as a hypothetical site for a KBS-3H repository. The present report is part of a portfolio of reports discussing the long-term safety of the KBS-3H repository. The overall outcome of the KBS-3H safety studies is documented in the summary report, 'Safety assessment for a KBS-3H repository for spent nuclear fuel at Olkiluoto'. The purpose and scope of the KBS-3H complementary evaluations of safety report is provided in Posiva's Safety Case Plan, which is based on Regulatory Guide YVL 8.4 and on international guidelines on complementary lines of argument to long-term safety that are considered an important element of a post-closure safety case for geological repositories. Complementary evaluations of safety require the use of evaluations, evidence and qualitative supporting arguments

  6. Cold vacuum drying facility site evaluation report

    International Nuclear Information System (INIS)

    Diebel, J.A.

    1996-01-01

    In order to transport Multi-Canister Overpacks to the Canister Storage Building they must first undergo the Cold Vacuum Drying process. This puts the design, construction and start-up of the Cold Vacuum Drying facility on the critical path of the K Basin fuel removal schedule. This schedule is driven by a Tri-Party Agreement (TPA) milestone requiring all of the spent nuclear fuel to be removed from the K Basins by December, 1999. This site evaluation is an integral part of the Cold Vacuum Drying design process and must be completed expeditiously in order to stay on track for meeting the milestone

  7. International workshop on site investigation and evaluation based on the siting process in Sweden

    International Nuclear Information System (INIS)

    Andersson, Johan; Stroem, A.

    2001-06-01

    the site-specific conditions for the three sites of interest. Most groups agreed that core drilling at a location within what is presumed to be a 'block of good rock' should be started as soon as possible. However, to be meaningful it is first necessary to formulate a preliminary structural model of the site such that the results of the bore hole investigations can be properly evaluated. The suite of investigation methods available to SKB and included in the SKB programme was discussed. The working groups only identified a few more site characterisation methods worth considering. Particular consideration was recommended for 3D seismic surveying and long directional drilling. Most groups pointed out the need for SKB to establish sufficient structure, in terms of decision-making and project management organisation, to enable prioritisation of programme objectives, clear demarcation of programme responsibilities and the positive identification of intermediate programme goals. Several groups suggested quite similar organisations with different teams at each site but combined with a rather strong central evaluation function. The need for integrating Safety Assessment, Design and Site Investigation was stressed. SKB is presently in the process of changing the organisation to meet the demands of site characterisation work. Finally, the timing was excellent for having our reports reviewed by a group of international experts and to get comments and proposals at different levels. The summary of the workshop as presented in this report will be essential for the continued planning work

  8. Preliminary safety evaluation for CSR1000 with passive safety system

    International Nuclear Information System (INIS)

    Wu, Pan; Gou, Junli; Shan, Jianqiang; Zhang, Bo; Li, Xiang

    2014-01-01

    Highlights: • The basic information of a Chinese SCWR concept CSR1000 is introduced. • An innovative passive safety system is proposed for CSR1000. • 6 Transients and 3 accidents are analysed with system code SCTRAN. • The passive safety systems greatly mitigate the consequences of these incidents. • The inherent safety of CSR1000 is enhanced. - Abstract: This paper describes the preliminary safety analysis of the Chinese Supercritical water cooled Reactor (CSR1000), which is proposed by Nuclear Power Institute of China (NPIC). The two-pass core design applied to CSR1000 decreases the fuel cladding temperature and flattens the power distribution of the core at normal operation condition. Each fuel assembly is made up of four sub-assemblies with downward-flow water rods, which is favorable to the core cooling during abnormal conditions due to the large water inventory of the water rods. Additionally, a passive safety system is proposed for CSR1000 to increase the safety reliability at abnormal conditions. In this paper, accidents of “pump seizure”, “loss of coolant flow accidents (LOFA)”, “core depressurization”, as well as some typical transients are analysed with code SCTRAN, which is a one-dimensional safety analysis code for SCWRs. The results indicate that the maximum cladding surface temperatures (MCST), which is the most important safety criterion, of the both passes in the mentioned incidents are all below the safety criterion by a large margin. The sensitivity analyses of the delay time of RCPs trip in “loss of offsite power” and the delay time of RMT actuation in “loss of coolant flowrate” were also included in this paper. The analyses have shown that the core design of CSR1000 is feasible and the proposed passive safety system is capable of mitigating the consequences of the selected abnormalities

  9. Safety evaluation of the Dalat research reactor operation

    International Nuclear Information System (INIS)

    Long, V.H.; Lam, P.V.; An, T.K.

    1989-01-01

    After an introduction presenting the essential characteristics of the Dalat Nuclear Research Reactor, the document presents i) The safety assurance condition of the reactor, ii) Its safety behaviour after 5 years of operation, iii) Safety research being realized on the reactor. Following is questionnaire of safety evaluation and a list of attachments, which concern the reactor

  10. [Safety evaluation of niuhuang jiedu tablet].

    Science.gov (United States)

    Feng, Yu-Ling; Miao, Jia-wei; Li, Jing; Sung, An-Sheng; Liu, Jie

    2014-09-01

    Realgar-containing Niuhuang Jiedu tablet (NHJD) has been applied in clinic for more than 800 years. However, because realgar contains arsenic (As), it has aroused wide concerns and controversies both at home and abroad. Currently, there are two misunderstandings about realgar-containing Chinese patent medicines. First, some people exaggerated realgar's toxicity as that of arsenic. Second, they recommended to remove realgar from traditional Chinese medicine compounds. In this paper, the authors summarized the advance in studies on NHJD, and proposed different opinions: (1) It is inappropriate to take total As as the index in safety evaluation of NHJD. (2) The toxicity of NHJD is dependent on the dose and duration of administration. (3) Realgar is an active ingredient of NHJD, and shall be deeply studied. Classic realgar-containing traditional Chinese medicine prescriptions, such as Niuhuang Jiedu tablet, shall be evaluated with rigorous modern scientific basis, with the aim to guide rational and safe application.

  11. Safety evaluation of BWR off-gas treatment systems

    International Nuclear Information System (INIS)

    Schultz, R.J.; Schmitt, R.C.

    1975-01-01

    Some of the results of a safety evaluation performed on current generic types of BWR off-gas treatment systems including cooled and ambient temperature adsorber beds and cryogenics are presented. The evaluation covered the four generic types of off-gas systems and the systems of five major vendors. This study was part of original work performed under AEC contract for the Directorate of Regulatory Standards. The analysis techniques employed for the safety evaluation of these systems include: Fault Tree Analysis; FMECA (Failure Mode Effects and Criticality Analysis); general system comparisons, contaminant, system control, and design adequacy evaluations; and resultant Off-Site Dose Calculations. The salient areas presented are some of the potential problem areas, the approach that industry has taken to mitigate or design against potential upset conditions, and areas where possible deficiencies still exist. Potential problem areas discussed include hydrogen detonation, hydrogen release to equipment areas, operator/automatic control interface, and needed engineering evaluation to insure safe system operation. Of the systems reviewed, most were in the category of advanced or improved over that commonly in use today, and a conclusion from the study was that these systems offer excellent potential for noble gas control for BWR power plants where more stringent controls may be specified -- now or in the future. (U.S.)

  12. Handling of future human actions in the safety assessment SR-Site

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    This report documents the future human actions, FHA, considered in the long-term safety analysis of a KBS-3 repository. The report is one of the supporting documents to the safety assessment SR-Site (see further the Main report /SKB 2011/). The purpose of this report is to provide an account of general considerations concerning FHA, the methodology applied in SR-Site to assess FHA, the aspects of FHA needed to be considered in the evaluation of their impact on a deep geological repository and to select and analyse representative scenarios for illustrative consequence analysis. The main focus of this report is a time period when institutional control has ceased to be effective, thereby permitting inadvertent intrusion. However, a brief discussion of the earlier period when the repository has been closed, sealed and continuously kept under institutional control is also provided. General The potential exposure to large quantities of radiotoxic material is an inescapable consequence of the deposition of spent nuclear fuel in a final repository, and consequently intrusion into the repository needs to be considered in repository design and safety assessment. In accordance with ICRP recommendations /ICRP 2000/, intrusion in the post-closure phase of institutional control and beyond is primarily prevented through the design of the repository. In addition to that there will presumably continue to be safeguards measures, preservation of information (record keeping) and possibly some sort of markers placed at the site. During the institutional control period, activities at the site have to be restricted or directed if they have the potential to interfere with or hinder surveillance of the site, but this does not necessarily rule out all forms of access to the area. Also the fact that the repository contains fissile materials is an important aspect. Control of safeguards measures will most likely be upheld by national as well as international agencies. Furthermore, the

  13. Handling of future human actions in the safety assessment SR-Site

    International Nuclear Information System (INIS)

    2010-12-01

    This report documents the future human actions, FHA, considered in the long-term safety analysis of a KBS-3 repository. The report is one of the supporting documents to the safety assessment SR-Site (see further the Main report /SKB 2011/). The purpose of this report is to provide an account of general considerations concerning FHA, the methodology applied in SR-Site to assess FHA, the aspects of FHA needed to be considered in the evaluation of their impact on a deep geological repository and to select and analyse representative scenarios for illustrative consequence analysis. The main focus of this report is a time period when institutional control has ceased to be effective, thereby permitting inadvertent intrusion. However, a brief discussion of the earlier period when the repository has been closed, sealed and continuously kept under institutional control is also provided. General The potential exposure to large quantities of radiotoxic material is an inescapable consequence of the deposition of spent nuclear fuel in a final repository, and consequently intrusion into the repository needs to be considered in repository design and safety assessment. In accordance with ICRP recommendations /ICRP 2000/, intrusion in the post-closure phase of institutional control and beyond is primarily prevented through the design of the repository. In addition to that there will presumably continue to be safeguards measures, preservation of information (record keeping) and possibly some sort of markers placed at the site. During the institutional control period, activities at the site have to be restricted or directed if they have the potential to interfere with or hinder surveillance of the site, but this does not necessarily rule out all forms of access to the area. Also the fact that the repository contains fissile materials is an important aspect. Control of safeguards measures will most likely be upheld by national as well as international agencies. Furthermore, the

  14. Central repository for low- and intermediate-level waste (ALMA) conceptual design, siting and safety study

    International Nuclear Information System (INIS)

    Kjellbert, N.; Haeggblom, H.; Cederstroem, M.; Lundgren, T.

    1980-07-01

    A generic design, siting and safety study of a proposed repository for low- and intermediate-level waste has been made. Special emphasis has been placed on safety characterostics. The conceptual design and the generic site, on which the study is based, are realistically chosen in accordance with present construction techniques and the existing geohydrological conditions in Sweden. (Auth.)

  15. Fuel and canister process report for the safety assessment SR-Site

    International Nuclear Information System (INIS)

    Werme, Lars; Lilja, Christina

    2010-12-01

    This report documents fuel and canister processes identified as relevant to the long-term safety of a KBS-3 repository. It forms an important part of the reporting of the safety assessment SR-Site. The detailed assessment methodology, including the role of the process reports in the assessment, is described in the SR-Site Main report /SKB 2011/

  16. Fuel and canister process report for the safety assessment SR-Site

    Energy Technology Data Exchange (ETDEWEB)

    Werme, Lars; Lilja, Christina (eds.)

    2010-12-15

    This report documents fuel and canister processes identified as relevant to the long-term safety of a KBS-3 repository. It forms an important part of the reporting of the safety assessment SR-Site. The detailed assessment methodology, including the role of the process reports in the assessment, is described in the SR-Site Main report /SKB 2011/

  17. Safety evaluation of Tokai reprocessing plant (TRP). Report of safety evaluation of Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Yamauchi, Takamichi; Maki, Akira; Nojiri, Ichiro

    1999-02-01

    The fire and explosion incident of the bituminization facility happened in March 1997 although JNC had taken enough care of the safety of TRP. JNC reflected on it and decided to evaluate the safety of TRP voluntarily. This evaluation has included five activities, that is, (1) confirmation of the structure and organization of TRP, (2) research of the data for operation, radiation and maintenance of TRP, (3) research of reflection of the accidents and troubles which have happened at the past, (4) evaluation on the prevention system, (5) evaluation on the mitigation system. We publish this report to contribute to inheritance of accumulated knowledge and techniques from generation to generation, and remind us of lesson from the fire and explosion incident of the bituminization. (author)

  18. A risk evaluation model using on-site meteorological data

    International Nuclear Information System (INIS)

    Kang, C.S.

    1979-01-01

    A model is considered in order to evaluate the potential risk from a nuclear facility directly combining the on site meteorological data. The model is utilized to evaluate the environmental consequences from the routine releases during normal plant operation as well as following postulated accidental releases. The doses to individual and risks to the population-at-large are also analyzed in conjunction with design of rad-waste management and safety systems. It is observed that the conventional analysis, which is done in two separate unaffiliated phases of releases and atmospheric dispersion tends to result in unnecessary over-design of the systems because of high resultant doses calculated by multiplication of two extreme values. (author)

  19. Subsurface characterization and geohydrologic site evaluation West Chestnut Ridge site

    International Nuclear Information System (INIS)

    1984-01-01

    The West Chestnut Ridge Site at the Oak Ridge National Laboratory is being considered for use as a repository for low-level radioactive waste. The purposes of this study were to provide a geohydrological characterization of the site for use in pathways analysis, and to provide preliminary geotechnical recommendations that would be used for development of a site utilization plan. Subsurface conditions were investigated at twenty locations and observation wells were installed. Field testing at each location included the Standard Penetration Test and permeability tests in soil and rock. A well pumping test was ocmpleted at one site. Laboratory testing included permeability, deformability, strength and compaction tests, as well as index and physical property tests. The field investigations showed that the subsurface conditions include residual soil overlying a weathered zone of dolomite which grades into relatively unweathered dolomite at depth. The thickness of residual soil is typically 80 ft (24 m) on the ridges, but can be as little as 10 ft (3 m) in the valleys. Trench excavations to depths of 30 ft (9 m) should not present serious slope stability problems above the water table. On-site soils can be used for liners or trench backfill but these soils may require moisture conditioning to achieve required densities. 19 figures, 8 tables

  20. Probabilistic and deterministic safety study of the transportation of liquefied gases in the vicinity of a nuclear site

    International Nuclear Information System (INIS)

    Gobert, T.; Lannoy, A.

    1982-01-01

    The safety analyses for nuclear power plants devotes special attention to the evaluation of hazards which may be induced by industrial activity in the environment of nuclear sites. For instance, explosion of a drifting gas cloud resulting from an accidental release of liquefied gas may jeopardize the plant safety. The paper presents the methodology, both probabilistic and deterministic, followed by Electricite de France to evaluate these risks. It particularly shows that the probabilistic approach is strongly linked with the definition of ''design basis accidents'' and the evaluation of their effects

  1. Evaluating the Long-Term Safety of a Repository at Yucca Mountain

    International Nuclear Information System (INIS)

    Luik, Abe Van

    2002-01-01

    Regulations require that the repository be evaluated for its health and safety effects for 10,000 years for the Site Recommendation process. Regulations also require potential impacts to be evaluated for up to a million years in an Environmental Impact Statement. The Yucca Mountain Project is in the midst of the Site Recommendation process. The Total System Performance Assessment (TSPA) that supports the Site Recommendation evaluated safety for these required periods of time. Results showed it likely that a repository at this site could meet the licensing requirements promulgated by the Nuclear Regulatory Commission. The TSPA is the tool that integrates the results of many years of scientific investigations with design information to allow evaluations of potential far-future impacts of building a Yucca Mountain repository. Knowledge created in several branches of physics is part of the scientific basis of the TSPA that supports the Site Recommendation process.

  2. Tsunami hazard assessment on nuclear power plant site evaluation accordance on DS 417

    International Nuclear Information System (INIS)

    Akhmad Khusyairi

    2011-01-01

    Nuclear power plant site evaluation should conduct the hazard evaluation on tsunami. Global climate changes and particularly extreme meteorology and hydrology phenomena have an impact on the structure, systems and important components related to safety. Therefore, IAEA makes efforts to revise the IAEA Safety Standard Series NS-G 3.4, Meteorological Events in Site Evaluation for Nuclear Power Plants and IAEA safety standard series NS-G 3.5 Flood Hazard For Nuclear Power Plants On Coastal And River Sites, in order to provide protection against the public and the environment safety due to operation of nuclear power plants. There are two methods used in assessing tsunami hazard, probabilistic and deterministic methods. In the tsunami hazard assessment, some necessary information and data should be obtained to determine the basic design of tsunami hazard during designing nuclear power plants, especially the cooling system design. Flooding caused tsunami must be evaluated to determine the site protection system. Furthermore, There must be an evaluation on either coincident event or meteorological simultaneously tsunami event that caused the worst effect on the site. Therefore, the protection of the site from extreme tsunami can be planned. (author)

  3. Site evaluation using measured meteorology data

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, R. E.; Rusche, B. C. [Savannah River Lab., E.I. du Pont de Nemours and Co., Aiken, South Carolina (United States)

    1967-07-01

    A key factor in reactor site evaluation is the frequency of occurrence of various dispersion conditions and this relationship to potential off-site doses following a reactor accident. Detailed measurements of the wind speed, wind direction, and temperature at heights up to 1200 ft at the Savannah River Plant form the basis for a comprehensive analysis of the frequency of occurrence of potential off-site doses. A complete set of data was taken about every five minutes, and 107,000 sets (about one year of data) were analyzed. The meteorology data were converted to ordinary dispersion parameters through correlating equations developed at Brookhaven National Laboratory. The results were expressed on curves in dose per unit release of activity vs distance from the reactor with probability of occurrence as a parameter. Separate sets of curves were calculated for releases of noble gas and of halogens and at release heights of 200 ft (a nominal stack height) and of 850 ft (about the height of the tallest power plant stacks). Additional curves were developed to show dose as a function of direction and probability of occurrence. In addition to the dose frequency distribution analyses performed as a function of height of release, direction, and distance; more conventional frequency distributions of wind speed, wind direction, and thermal stability were developed as a function of height. All the analyses were carried out on the IBM 360/65. These results represent the first known analysis utilizing data up to 1200 ft and taken often enough to develop reliable frequency distributions for a short term release. (author)

  4. A Methodology for Evaluating Quantitative Nuclear Safety Culture Impact

    International Nuclear Information System (INIS)

    Han, Kiyoon; Jae, Moosung

    2015-01-01

    Through several accidents of NPPs including the Fukushima Daiichi in 2011 and Chernobyl accidents in 1986, nuclear safety culture has been emphasized in reactor safety world-widely. In Korea, KHNP evaluates the safety culture of NPP itself. KHNP developed the principles of the safety culture in consideration of the international standards. A questionnaire and interview questions are also developed based on these principles and it is used for evaluating the safety culture. However, existing methodology to evaluate the safety culture has some disadvantages. First, it is difficult to maintain the consistency of the assessment. Second, the period of safety culture assessment is too long (every two years) so it has limitations in preventing accidents occurred by a lack of safety culture. Third, it is not possible to measure the change in the risk of NPPs by weak safety culture since it is not clearly explains the effect of safety culture on the safety of NPPs. In this study, Safety Culture Impact Assessment Model (SCIAM) is developed overcoming these disadvantages. In this study, SCIAM which overcoming disadvantages of exiting safety culture assessment method is developed. SCIAM uses SCII to monitor the statues of the safety culture periodically and also uses RCDF to quantify the safety culture impact on NPP's safety. It is significant that SCIAM represents the standard of the healthy nuclear safety culture, while the exiting safety culture assessment presented only vulnerability of the safety culture of organization. SCIAM might contribute to monitoring the level of safety culture periodically and, to improving the safety of NPP

  5. A Methodology for Evaluating Quantitative Nuclear Safety Culture Impact

    Energy Technology Data Exchange (ETDEWEB)

    Han, Kiyoon; Jae, Moosung [Hanyang University, Seoul (Korea, Republic of)

    2015-05-15

    Through several accidents of NPPs including the Fukushima Daiichi in 2011 and Chernobyl accidents in 1986, nuclear safety culture has been emphasized in reactor safety world-widely. In Korea, KHNP evaluates the safety culture of NPP itself. KHNP developed the principles of the safety culture in consideration of the international standards. A questionnaire and interview questions are also developed based on these principles and it is used for evaluating the safety culture. However, existing methodology to evaluate the safety culture has some disadvantages. First, it is difficult to maintain the consistency of the assessment. Second, the period of safety culture assessment is too long (every two years) so it has limitations in preventing accidents occurred by a lack of safety culture. Third, it is not possible to measure the change in the risk of NPPs by weak safety culture since it is not clearly explains the effect of safety culture on the safety of NPPs. In this study, Safety Culture Impact Assessment Model (SCIAM) is developed overcoming these disadvantages. In this study, SCIAM which overcoming disadvantages of exiting safety culture assessment method is developed. SCIAM uses SCII to monitor the statues of the safety culture periodically and also uses RCDF to quantify the safety culture impact on NPP's safety. It is significant that SCIAM represents the standard of the healthy nuclear safety culture, while the exiting safety culture assessment presented only vulnerability of the safety culture of organization. SCIAM might contribute to monitoring the level of safety culture periodically and, to improving the safety of NPP.

  6. YUCCA MOUNTAIN SITE CHARACTERIZATIONS PROJECT TUNNEL BORING MACHINE (TBM) SYSTEM SAFETY ANALYSIS

    International Nuclear Information System (INIS)

    1997-01-01

    The purpose of this analysis is to systematically identify and evaluate hazards related to the tunnel boring machine (TBM) used in the Exploratory Studies Facility (ESF) at the Yucca Mountain Site Characterization Project. This process is an integral part of the systems engineering process; whereby safety is considered during planning, design, testing, and construction. Since the TBM is an ''as built'' system, the MandO is conducting the System Safety Analysis during the construction or assembly phase of the TBM. A largely qualitative approach was used since a radiological System Safety Analysis is not required. The risk assessment in this analysis characterizes the accident scenarios associated with the TBM in terms of relative risk and includes recommendations for mitigating all identified risks. The priority for recommending and implementing mitigation control features is: (1) Incorporate measures to reduce risks and hazards into the system/subsystem/component design, (2) add safety features and capabilities to existing designs, and (3) develop procedures and conduct training to increase worker awareness of potential hazards, on methods to reduce exposure to hazards, and on the actions required to avoid accidents or correct hazardous conditions. The scope of this analysis is limited to the TBM during normal operations, excluding hazards occurring during assembly and test of the TBM or maintenance of the TBM equipment

  7. YUCCA MOUNTAIN SITE CHARACTERIZATIONS PROJECT TUNNEL BORING MACHINE (TBM) SYSTEM SAFETY ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1997-02-19

    The purpose of this analysis is to systematically identify and evaluate hazards related to the tunnel boring machine (TBM) used in the Exploratory Studies Facility (ESF) at the Yucca Mountain Site Characterization Project. This process is an integral part of the systems engineering process; whereby safety is considered during planning, design, testing, and construction. Since the TBM is an ''as built'' system, the M&O is conducting the System Safety Analysis during the construction or assembly phase of the TBM. A largely qualitative approach was used since a radiological System Safety Analysis is not required. The risk assessment in this analysis characterizes the accident scenarios associated with the TBM in terms of relative risk and includes recommendations for mitigating all identified risks. The priority for recommending and implementing mitigation control features is: (1) Incorporate measures to reduce risks and hazards into the system/subsystem/component design, (2) add safety features and capabilities to existing designs, and (3) develop procedures and conduct training to increase worker awareness of potential hazards, on methods to reduce exposure to hazards, and on the actions required to avoid accidents or correct hazardous conditions. The scope of this analysis is limited to the TBM during normal operations, excluding hazards occurring during assembly and test of the TBM or maintenance of the TBM equipment.

  8. The role of safety analyses in site selection. Some personal observations based on the experience from the Swiss site selection process

    Energy Technology Data Exchange (ETDEWEB)

    Zuidema, Piet [Nagra, Wettingen (Switzerland)

    2015-07-01

    In Switzerland, the site selection process according to the ''Sectoral Plan for Deep Geological Repositories'' (BFE 2008) is underway since 2008. This process takes place in three stages. In stage 1 geological siting regions (six for the L/ILW repository and three for the HLW repository) have been identified, in stage 2 sites for the surface facilities have been identified for all siting regions in close co-operation with the sting regions and a narrowing down of the number of siting regions based on geological criteria will take place. In stage 3 the sites for a general license application are selected and the general license applications will be submitted which eventually will lead to the siting decision for both repository types. In the Swiss site selection process, safety has the highest priority. Many factors affect safety and thus a whole range of safety-related issues are considered in the identification and screening of siting possibilities. Besides dose calculations a range of quantitative and qualitative issues are considered. Dose calculations are performed in all three stages of the site selection process. In stage 1 generic safety calculations were made to develop criteria to be used for the identification of potential siting regions. In stage 2, dose calculations are made for comparing the different siting regions according to a procedure prescribed in detail by the regulator. Combined with qualitative evaluations this will lead to a narrowing down of the number of siting regions to at least two siting regions for each repository type. In stage 3 full safety cases will be prepared as part of the documentation for the general license applications. Besides the dose calculations, many other issues related to safety are analyzed in a quantitative and qualitative manner. These consider the 13 criteria defined in the Sectoral Plan and the corresponding indicators. The features analyzed cover the following broad themes: efficiency of

  9. The role of safety analyses in site selection. Some personal observations based on the experience from the Swiss site selection process

    International Nuclear Information System (INIS)

    Zuidema, Piet

    2015-01-01

    In Switzerland, the site selection process according to the ''Sectoral Plan for Deep Geological Repositories'' (BFE 2008) is underway since 2008. This process takes place in three stages. In stage 1 geological siting regions (six for the L/ILW repository and three for the HLW repository) have been identified, in stage 2 sites for the surface facilities have been identified for all siting regions in close co-operation with the sting regions and a narrowing down of the number of siting regions based on geological criteria will take place. In stage 3 the sites for a general license application are selected and the general license applications will be submitted which eventually will lead to the siting decision for both repository types. In the Swiss site selection process, safety has the highest priority. Many factors affect safety and thus a whole range of safety-related issues are considered in the identification and screening of siting possibilities. Besides dose calculations a range of quantitative and qualitative issues are considered. Dose calculations are performed in all three stages of the site selection process. In stage 1 generic safety calculations were made to develop criteria to be used for the identification of potential siting regions. In stage 2, dose calculations are made for comparing the different siting regions according to a procedure prescribed in detail by the regulator. Combined with qualitative evaluations this will lead to a narrowing down of the number of siting regions to at least two siting regions for each repository type. In stage 3 full safety cases will be prepared as part of the documentation for the general license applications. Besides the dose calculations, many other issues related to safety are analyzed in a quantitative and qualitative manner. These consider the 13 criteria defined in the Sectoral Plan and the corresponding indicators. The features analyzed cover the following broad themes: efficiency of

  10. Development of the safety evaluation system in the respects of organizational factors and workers' consciousness. Pt. 1. Study of validities of functions for necessary evaluation and results obtained

    International Nuclear Information System (INIS)

    Takano, Kenichi; Tsuge, Tadafumi; Hasegawa, Naoko; Hirose, Ayako; Sasou, Kunihide

    2002-01-01

    CRIEPI decided to develop the safety evaluation system to investigate the safety level of the industrial sites due to questionnaires of organizational climate, safety managements, and workers' safety consciousness to workers. This report describes the questionnaire survey to apply to the domestic nuclear power plant for using obtained results as a fundamental data in order to construct the safety evaluation system. This system will be used for promoting safety culture in organizations of nuclear power plants. The questionnaire survey was conducted to 14 nuclear power stations for understanding the present status relating to safety issues. This questionnaire involves 122 items classified into following three categories: (1) safety awareness and behavior of plant personnel; (2) safety management; (3) organizational climate, based on the model considering contributing factor groups to safety culture. Obtained results were analyzed by statistical method to prepare functions of evaluation. Additionally, by applying a multivariate analysis, it was possible to extract several crucial factors influencing safety performance and to find a comprehensive safety indicator representing total organizational safety level. Significant relations were identified between accident rates (both labor accidents and facility failures) and above comprehensive safety indicator. Next, 122 questionnaire items were classified into 20 major safety factors to grasp the safety profiles of each site. This profile is considered as indicating the features of each site and also indicating the direction of progress for improvement of safety situation in the site. These findings can be reflected in developing the safety evaluation system, by confirming the validity of the evaluation method and giving specific functions. (author)

  11. Confined Site Construction: A qualitative investigation of critical issues affecting management of Health and Safety

    OpenAIRE

    Spillane, John P.; Oyedele, Lukumon O.; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E.; Tijani, Iyabo K.

    2011-01-01

    The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, th...

  12. The Impact of Transformational Leadership on Safety Climate and Individual Safety Behavior on Construction Sites

    Directory of Open Access Journals (Sweden)

    Yuzhong Shen

    2017-01-01

    Full Text Available Unsafe acts contribute dominantly to construction accidents, and increasing safety behavior is essential to reduce accidents. Previous research conceptualized safety behavior as an interaction between proximal individual differences (safety knowledge and safety motivation and distal contextual factors (leadership and safety climate. However, relatively little empirical research has examined this conceptualization in the construction sector. Given the cultural background of the sample, this study makes a slight modification to the conceptualization and views transformational leadership as an antecedent of safety climate. Accordingly, this study establishes a multiple mediator model showing the mechanisms through which transformational leadership translates into safety behavior. The multiple mediator model is estimated by the structural equation modeling (SEM technique, using individual questionnaire responses from a random sample of construction personnel based in Hong Kong. As hypothesized, transformational leadership has a significant impact on safety climate which is mediated by safety-specific leader–member exchange (LMX, and safety climate in turn impacts safety behavior through safety knowledge. The results suggest that future safety climate interventions should be more effective if supervisors exhibit transformational leadership, encourage construction personnel to voice safety concerns without fear of retaliation, and repeatedly remind them about safety on the job.

  13. The Impact of Transformational Leadership on Safety Climate and Individual Safety Behavior on Construction Sites.

    Science.gov (United States)

    Shen, Yuzhong; Ju, Chuanjing; Koh, Tas Yong; Rowlinson, Steve; Bridge, Adrian J

    2017-01-05

    Unsafe acts contribute dominantly to construction accidents, and increasing safety behavior is essential to reduce accidents. Previous research conceptualized safety behavior as an interaction between proximal individual differences (safety knowledge and safety motivation) and distal contextual factors (leadership and safety climate). However, relatively little empirical research has examined this conceptualization in the construction sector. Given the cultural background of the sample, this study makes a slight modification to the conceptualization and views transformational leadership as an antecedent of safety climate. Accordingly, this study establishes a multiple mediator model showing the mechanisms through which transformational leadership translates into safety behavior. The multiple mediator model is estimated by the structural equation modeling (SEM) technique, using individual questionnaire responses from a random sample of construction personnel based in Hong Kong. As hypothesized, transformational leadership has a significant impact on safety climate which is mediated by safety-specific leader-member exchange (LMX), and safety climate in turn impacts safety behavior through safety knowledge. The results suggest that future safety climate interventions should be more effective if supervisors exhibit transformational leadership, encourage construction personnel to voice safety concerns without fear of retaliation, and repeatedly remind them about safety on the job.

  14. The Impact of Transformational Leadership on Safety Climate and Individual Safety Behavior on Construction Sites

    Science.gov (United States)

    Shen, Yuzhong; Ju, Chuanjing; Koh, Tas Yong; Rowlinson, Steve; Bridge, Adrian J.

    2017-01-01

    Unsafe acts contribute dominantly to construction accidents, and increasing safety behavior is essential to reduce accidents. Previous research conceptualized safety behavior as an interaction between proximal individual differences (safety knowledge and safety motivation) and distal contextual factors (leadership and safety climate). However, relatively little empirical research has examined this conceptualization in the construction sector. Given the cultural background of the sample, this study makes a slight modification to the conceptualization and views transformational leadership as an antecedent of safety climate. Accordingly, this study establishes a multiple mediator model showing the mechanisms through which transformational leadership translates into safety behavior. The multiple mediator model is estimated by the structural equation modeling (SEM) technique, using individual questionnaire responses from a random sample of construction personnel based in Hong Kong. As hypothesized, transformational leadership has a significant impact on safety climate which is mediated by safety-specific leader–member exchange (LMX), and safety climate in turn impacts safety behavior through safety knowledge. The results suggest that future safety climate interventions should be more effective if supervisors exhibit transformational leadership, encourage construction personnel to voice safety concerns without fear of retaliation, and repeatedly remind them about safety on the job. PMID:28067775

  15. Safety Evaluation of Roundabouts in Georgia

    Science.gov (United States)

    2018-02-28

    Several previous studies have documented significant safety benefits of roundabouts in the United Sates. However, the safety benefits for a given roundabout may vary depending on factors such as the familiarity of the driving population to roundabout...

  16. Safety design and evaluation policy for future FBRs in Japan

    International Nuclear Information System (INIS)

    Aizawa, Kiyoto

    1991-01-01

    The safety policy for fast breeder reactors (FBRs) has gradually matured in accordance with the development of FBRs. The safety assessment of the Japanese prototype FBR, Monju during the licensing process accelerated the maturity and the integration of knowledge and databases. Results are expected to be reflected in the establishment of the safety design and evaluation policy for FBRs. Although the methodologies and safety policies developed for LWRs are applicable in principle to future FBRs, it is neither rational nor realistic to treat safety only with these policies. It is recommended that one should develop the methodologies and safety policies starting from understanding of the inherent safety characteristics of FBR's through safety research, plant operating experience and design work. In the last few years, some technical committees were organized in Japan and have discussed key safety issues which are specific to FBRs in order to provide preparatory reports and to establish safety standards and guidelines for future commercial FBRs. (author)

  17. Construction Site Workers’ Awareness on Using Safety Equipment: Case Study

    OpenAIRE

    Ulang N. Md; Salim N. S.; Baharum F.; Agus Salim N.A.

    2014-01-01

    Construction sector is an important sector and contributed significantly to national development. However, this sector poses higher risk to accident. This is due to fact that construction site can be considered as a dangerous zone to workers and to the public. Due to the variety of cases occurs on site, the contractor will usually have to pay the cost related to accidents in the form of higher insurance premium. Despite various measures, accidents still occur at construction sites. Personal P...

  18. Report of early site suitability evaluation of the potential repository site at Yucca Mountain, Nevada; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Younker, J.L.; Andrews, W.B.; Fasano, G.A.; Herrington, C.C.; Mattson, S.R.; Murray, R.C. [Science Applications International Corp., Las Vegas, NV (United States); Ballou, L.B.; Revelli, M.A. [Lawrence Livermore National Lab., CA (United States); Ducharme, A.R.; Shephard, L.E. [Sandia National Labs., Albuquerque, NM (United States); Dudley, W.W.; Hoxie, D.T. [Geological Survey, Denver, CO (United States); Herbst, R.J.; Patera, E.A. [Los Alamos National Lab., NM (United States); Judd, B.R. [Decision Analysis Co., Portola Valley, CA (United States); Docka, J.A.; Rickertsen, L.D. [Weston Technical Associates, Washington, DC (United States)

    1992-01-01

    This study evaluated the technical suitability of Yucca Mountain, Nevada, as a potential site for a mined geologic repository for the permanent disposal of radioactive waste. The evaluation was conducted primarily to determine early in the site characterization program if there are any features or conditions at the site that indicate it is unsuitable for repository development. A secondary purpose was to determine the status of knowledge in the major technical areas that affect the suitability of the site. This early site suitability evaluation (ESSE) was conducted by a team of technical personnel at the request of the Associate Director of the US Department of Energy (DOE) Office of Geologic Disposal, a unit within the DOE`s Office of Civilian Radioactive Waste Management. The Yucca Mountain site has been the subject of such evaluations for over a decade. In 1983, the site was evaluated as part of a screening process to identify potentially acceptable sites. The site was evaluated in greater detail and found suitable for site characterization as part of the Environmental Assessment (EA) (DOE, 1986) required by the Nuclear Waste Policy Act of 1982 (NWPA). Additional site data were compiled during the preparation of the Site Characterization Plan (SCP) (DOE, 1988a). This early site suitability evaluation has considered information that was used in preparing both-documents, along with recent information obtained since the EA and SCP were published. This body of information is referred to in this report as ``current information`` or ``available evidence.``

  19. Information report on nuclear safety and radiation protection of the Tricastin AREVA site, 2010 edition

    International Nuclear Information System (INIS)

    2010-01-01

    This report presents the Tricastin site, the different arrangements concerning nuclear safety and radiation protection on this site, and recent nuclear events. It describes how site releases are managed and how the environment is controlled and monitored, how wastes are managed, and how other impacts are controlled. It finally presents the different actions regarding transparency and information

  20. Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses

    International Nuclear Information System (INIS)

    Kohler, S.; Brown, T.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced. Basis of Interim Operations (BIOs) with I-HASPs as their safety basis during the closure process

  1. Method of safety evaluation in nuclear power plants

    International Nuclear Information System (INIS)

    Kuraszkiewicz, P.; Zahn, P.

    1988-01-01

    A novel quantitative technique for evaluating safety of subsystems of nuclear power plants based on expert estimations is presented. It includes methods of mathematical psychology recognizing the effect of subjective factors in the expert estimates and, consequently, contributes to further objectification of evaluation. It may be applied to complementing probabilistic safety assessment. As a result of such evaluations a characteristic 'safety of nuclear power plants' is obtained. (author)

  2. Operational safety analysis of the Olkiluoto disposal site

    International Nuclear Information System (INIS)

    Rossi, J.; Suolanen, V.

    2013-11-01

    Radiation doses for workers of the facilities, for inhabitants in the environment and for terrestrial ecosystem possibly caused by the encapsulation and disposal facilities to be built at Olkiluoto during its operation were considered in the study. First the normal encapsulation process is described and then possible incident and accident cases associated to that are identified for this assessment. The study covers both the normal operation of the plant and some hypothetical incidents and accidents. Radioactive releases and radiation doses are evaluated as a consequence of normal operation and some essential incident and accident cases. Release through the ventilation stack is assumed to be filtered (activated when necessary) both in normal operation and in hypothetical abnormal fault and accident cases. In addition the results for unfiltered releases are also presented e.g. for the emergency planning. During about 30 operation years of our four nuclear power plant units there have been found 58 fuel pins failures. Roughly estimating there has been one fuel leakage per year in a facility (includes two units). Based on this and adopting a conservative approach, it is estimated that one fuel pin per year could leak in normal operation during encapsulation process. The release magnitude in incidents and accidents is based on the event chains, which lead to loss of fuel pin tightness followed by a discharge of radionuclides into the handling space and to some degree to the atmosphere through the ventilation stack equipped with redundant filters. The most exposed group of inhabitants is conservatively assumed to live at the distance of 200 meters from the encapsulation and disposal plant and it will receive the largest doses in most dispersion conditions. The dose value to a member of the most exposed group was calculated on the basis of the weather data in such a way that greater dose than obtained here is caused only in 0.5 percent of dispersion conditions. The

  3. Geoscientific long-term prognosis. Preliminary safety analysis for the site Gorleben

    International Nuclear Information System (INIS)

    Mrugalla, Sabine

    2011-07-01

    The preliminary safety analysis of the site Gorleben includes the following chapters: (1) Introduction; (2) Aim and content of the geoscientific long-term prognosis for the site Gorleben; (3) Boundary conditions at the site Gorleben: climate; geomorphology; overlying rocks and adjoining rocks; hydrogeology; salt deposit Gorleben. (4) Probable future geological developments at the site Gorleben: supraregional developments with effects on the site Gorleben; glacial period developments; developments of the geomorphology, overlying and adjoining rocks; future developments of the hydrological systems at the site Gorleben; future saliniferous specific developments of the salt deposit Gorleben. (5) Commentary on the unlikely or excludable developments of the site Gorleben.

  4. Safety evaluation report. Fast Flux Test Facility. Project No. 448

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-01

    Information on the safety of the FFTF Reactor is presented under the following chapter headings: site characteristics; design of structures, components, equipment, and systems; reactor; reactor coolant system and connected systems; engineered safety features; electric power; auxiliary systems; radioactive waste management systems; radiation protection; conduct of operations; initial test programs; accident analysis; and quality assurance.

  5. Safety evaluation report. Fast Flux Test Facility. Project No. 448

    International Nuclear Information System (INIS)

    1978-01-01

    Information on the safety of the FFTF Reactor is presented under the following chapter headings: site characteristics; design of structures, components, equipment, and systems; reactor; reactor coolant system and connected systems; engineered safety features; electric power; auxiliary systems; radioactive waste management systems; radiation protection; conduct of operations; initial test programs; accident analysis; and quality assurance

  6. Nuclear safety. How is it evaluated?

    International Nuclear Information System (INIS)

    Andersson, Kjell; Andersson, Johan; Carlsson, Lennart; Olsson, Richard; Ericsson, A.M.; Gunsell, L.; Wene, C.O.

    1996-09-01

    A working group with representatives for the three subject areas reactor safety, disposal of spent fuels and transport of radioactive materials has performed a project aiming to clarify similarities and differences of the three areas concerning methods for safety analysis, criteria, risks etc; and to develop contacts between experts in the areas in order to facilitate transfer of methods. Some of the more precise objectives were: To identify common problems that could be solved jointly, to discuss prospects for a 'meta-method' that can support safety analysis in the entire field of nuclear safety, and to discuss possibilities for a homogeneous attitude towards risk management

  7. Evaluation of operating experience with safety values

    International Nuclear Information System (INIS)

    Bung, W.; Hoemke, P.; Oberender, W.; Paul, H.; Rueter, W.

    1985-01-01

    This report describes statistical investigations of 2076 functional tests carried out on power operated safety valves in conventional power plants in 1972 until 1983 with special regard to Common Mode-Failures. The results clearly show that Common Mode-Failures play an important part of non-availability for the controlled safety valves, especially in the control system. The 'Deutsche Risikostudie' does not consider any Common Mode-Failures of the primary safety valves. However there is no significant increase of the risk resulted by the primary safety valves in the 'Referenzanlage' if the calculated Common Mode-Failures probabilities are considered. (orig.) [de

  8. Use of safety analysis to site comfirmation procedure in case of hard rock repository

    International Nuclear Information System (INIS)

    Peltonen, E.K.

    1984-02-01

    The role of safety analysis in a confirmation procedure of a candidate disposal site of radioactive wastes is discussed. Items dealt with include principle reasons and practical goals of the use of safety analysis, methodology of safety analysis and assessment, as well as usefulness and adequacy of the present safety analysis. Safety analysis is a tool, which enables one to estimate quantitatively the possible radiological impacts from the disposal. The results can be compared with the criteria and the suitability conclusions drawn. Because of its systems analytical nature safety analysis is an effective method to reveal, what are the most important factors of the disposal system and the most critical site characteristics inside the lumped parameters often provided by the experimental site investigation methods. Furthermore it gives information on the accuracy needs of different site properties. This can be utilized to judge whether the quality and quantity of the measurements for the characterization are sufficient as well as to guide the further site investigations. A more practical discussion regarding the applicability of the use of safety analysis is presented by an example concerning the assessment of a Finnish candidate site for low- and intermediate-level radioactive waste repository. (author)

  9. The approaches of safety design and safety evaluation at HTTR (High Temperature Engineering Test Reactor)

    International Nuclear Information System (INIS)

    Iigaki, Kazuhiko; Saikusa, Akio; Sawahata, Hiroaki; Shinozaki, Masayuki; Tochio, Daisuke; Honma, Fumitaka; Tachibana, Yukio; Iyoku, Tatsuo; Kawasaki, Kozo; Baba, Osamu

    2006-06-01

    Gas Cooled Reactor has long history of nuclear development, and High Temperature Gas Cooled Reactor (HTGR) has been expected that it can be supply high temperature energy to chemical industry and to power generation from the points of view of the safety, the efficiency, the environment and the economy. The HTGR design is tried to installed passive safety equipment. The current licensing review guideline was made for a Low Water Reactor (LWR) on safety evaluation therefore if it would be directly utilized in the HTGR it needs the special consideration for the HTGR. This paper describes that investigation result of the safety design and the safety evaluation traditions for the HTGR, comparison the safety design and safety evaluation feature for the HTGT with it's the LWR, and reflection for next HTGR based on HTTR operational experiment. (author)

  10. Radionuclide sorption from the safety evaluation perspective

    International Nuclear Information System (INIS)

    1992-01-01

    Research and development directed towards the assessment of the long-term performance of radioactive waste disposal systems has been recognised as a priority area with a strong need for international co-operation and co-ordination. The ultimate aims is to promote the quality and credibility of safety assessment techniques for radioactive waste disposal. Sorption in the geosphere is one of the key processes for retarding the transport of radionuclide from the underground disposal facility to the biosphere. In many cases, sorption in the near field and in the biosphere is also important. A workshop, organised to favor discussion around a small number of invited papers, was held in October 1991: - to evaluate critically the way sorption processes are incorporated in performance assessment models; - to identify open issues of high priority, and; - to propose future activities to resolve these issues. These proceedings reproduce the invited papers and the conclusions and recommendations adopted by the workshop. Eight papers are in the INIS SCOPE. The main subjects studied are: sorption database comparison, sorption database development and three case studies, experimental techniques, adsorption models

  11. Development of inspection safety evaluation technology

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Seok Chul; Yoon, Yeo Chang; Kim, Jong Soo; Lee, Tae Young; Kim, Chang Ryol; Lee, Hyung Sub; Kim, Jong Soo

    1995-12-01

    The purpose of this project is to protection nation inspector`s over exposure from radiation that can be occurred by inspection activity at nuclear facilities and its environment, and to ensure the safety of inspection activity at the nuclear facilities. To effectively carry out the domestic inspection task to be enforced from 1996, the evaluation for special radiation exposure rate of nuclear facilities, air and surface contamination level, and measurement and monitoring of water contamination level were made to determine whether these measured values exceeded permissible limitations, and to protect the inspector`s over exposure from radiation at domestic nuclear facilities. Management of inspector`s exposure was carried out under assistance of the Department of Health Physics. Performance tests of two gamma detectors, one neutron detector, alpha and beta detector, and gamma spectroscopy analyzer were carried out to control dose on extremity, the characteristic test for extremity dosimeter was carried out and the theoretical calculation of gamma dose conversion factors based on ANSI N13.32 standard was performed. Under the 93+2 program, IAEA began to recognize the necessity of environmental observation technology development of air-borne particulates travelled from long distance location. Associated with the necessity of this technology development, a proposal of international joint research for development of the special radiation measurement and analysis has been prepared. (author). 21 tabs., 24 figs., 20 refs.

  12. Report of early site suitability evaluation of the potential repository site at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Younker, J.L.; Andrews, W.B.; Fasano, G.A.; Herrington, C.C.; Mattson, S.R.; Murray, R.C.; Ballou, L.B.; Revelli, M.A.; Ducharme, A.R.; Shephard, L.E.; Dudley, W.W.; Hoxie, D.T.; Herbst, R.J.; Patera, E.A.; Judd, B.R.; Docka, J.A.; Rickertsen, L.D.

    1992-01-01

    This study evaluated the technical suitability of Yucca Mountain, Nevada, as a potential site for a mined geologic repository for the permanent disposal of radioactive waste. The evaluation was conducted primarily to determine early in the site characterization program if there are any features or conditions at the site that indicate it is unsuitable for repository development. A secondary purpose was to determine the status of knowledge in the major technical areas that affect the suitability of the site. This early site suitability evaluation (ESSE) was conducted by a team of technical personnel at the request of the Associate Director of the US Department of Energy (DOE) Office of Geologic Disposal, a unit within the DOE's Office of Civilian Radioactive Waste Management. The Yucca Mountain site has been the subject of such evaluations for over a decade. In 1983, the site was evaluated as part of a screening process to identify potentially acceptable sites. The site was evaluated in greater detail and found suitable for site characterization as part of the Environmental Assessment (EA) (DOE, 1986) required by the Nuclear Waste Policy Act of 1982 (NWPA). Additional site data were compiled during the preparation of the Site Characterization Plan (SCP) (DOE, 1988a). This early site suitability evaluation has considered information that was used in preparing both-documents, along with recent information obtained since the EA and SCP were published. This body of information is referred to in this report as ''current information'' or ''available evidence.''

  13. Evaluation of Safety Culture Implementation and Socialization Results

    International Nuclear Information System (INIS)

    Situmorang, Johnny

    2003-01-01

    Evaluation of safety culture implementation and socialization results has been perform. Evaluation is carried out with specifying safety culture indicators, namely: Meeting between management and employee, system for incidents analysis, training activities related to improving safety, meeting with regulator, contractors, surveys on behavioural attitudes, and resources allocated to promote safety culture. Evaluation is based on observation and visiting the facilities to show the compliance indicator in term of good practices in the frame of safety culture implementation. For three facilities of research reactors, Kartini Yogyakarta, TRIGA Mark II Bandung and MPR-GAS Serpong, implementation of safety culture is considered good enough and progressive. Furthermore some indicator should be considered more intensive, for example the allocated resources, self assesment based on own questionnaire in the frame of improving the safety culture implementation. (author)

  14. Status report on resolution of Waste Tank Safety Issues at the Hanford Site. Revision 1

    International Nuclear Information System (INIS)

    Dukelow, G.T.; Hanson, G.A.

    1995-05-01

    The purpose of this report is to provide and update the status of activities supporting the resolution of waste tank safety issues and system deficiencies at the Hanford Site. This report provides: (1) background information on safety issues and system deficiencies; (2) a description of the Tank Waste Remediation System and the process for managing safety issues and system deficiencies; (3) changes in safety issue description, prioritization, and schedules; and (4) a summary of the status, plans, order of magnitude, cost, and schedule for resolving safety issues and system deficiencies

  15. Seismological studies carried out by the CEA in connection with the safety of nuclear sites

    International Nuclear Information System (INIS)

    Barbreau, A.; Ferrieux, H.; Mohammadioun, B.

    1975-01-01

    In order to evaluate the seismic risk at nuclear sites, the Department of Nuclear Safety of the French Atomic Energy Commission (CEA) has been conducting a programme of seismological studies for several years past. This programme is aimed at acquiring a better knowledge of seismic phenomena, in particular the spectral distribution of the energy of earthquakes, considered to be the only correct approach to the problem of earthquake protection, as well as a better knowledge of the seismic activity of the areas surrounding nuclear sites. The authors propose defining the design spectrum of the site on the basis of the probable energy at the source, the distance from the epicentre and the transfer function of the geological formations. The need - for the purpose of defining this spectrum - to acquire data on the characteristics of French earthquakes and on regional seismicity led the Department of Nuclear Safety to set up a network of seismic stations. It now has an observatory at the Cadarache Nuclear Research Centre and mobile stations with automatic magnetic recording for studying aftershock sequences and the activity of faults in the vicinity of nuclear sites, and for making the measurements necessary to calculate the transfer functions. With this equipment it was possible to record six aftershocks of the Oleron earthquake on 7 September 1972 close to the epicentre, and to calculate the spectra therefrom. The latter contained a lot of high frequencies, which is in agreement with the data obtained from other sources for earthquakes of low energy. The synthetic spectra calculated on the basis of one magnitude and one distance are in good agreement with the spectra obtained experimentally

  16. Safety Evaluation Approach with Security Controls for Safety I and C Systems on Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kim, D. H.; Jeong, S. Y.; Kim, Y. M.; Park, H. S.; Lee, M. S.; Kim, T. H.

    2016-01-01

    This paper addresses concepts of safety and security and relations between them for assessing effects of security features in safety systems. Also, evaluation approach for avoiding confliction with safety requirements and cyber security features which may be adopted in safety-related digital I and C system will be described. In this paper, safety-security life cycle model based confliction avoidance method was proposed to evaluate the effects when the cyber security control features are implemented in the safety I and C system. Also, safety effect evaluation results using the proposed evaluation method were described. In case of technical security controls, many of them are expected to conflict with safety requirements, otherwise operational and managerial controls are not relatively. Safety measures and cyber security measures for nuclear power plants should be implemented not to conflict with one another. Where safety function and security features are both required within the systems, and also where security features are implemented within safety systems, they should be justified

  17. Safety Evaluation Approach with Security Controls for Safety I and C Systems on Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Kim, D. H.; Jeong, S. Y.; Kim, Y. M.; Park, H. S. [KINS, Daejeon (Korea, Republic of); Lee, M. S.; Kim, T. H. [Formal Works Inc., Seoul (Korea, Republic of)

    2016-05-15

    This paper addresses concepts of safety and security and relations between them for assessing effects of security features in safety systems. Also, evaluation approach for avoiding confliction with safety requirements and cyber security features which may be adopted in safety-related digital I and C system will be described. In this paper, safety-security life cycle model based confliction avoidance method was proposed to evaluate the effects when the cyber security control features are implemented in the safety I and C system. Also, safety effect evaluation results using the proposed evaluation method were described. In case of technical security controls, many of them are expected to conflict with safety requirements, otherwise operational and managerial controls are not relatively. Safety measures and cyber security measures for nuclear power plants should be implemented not to conflict with one another. Where safety function and security features are both required within the systems, and also where security features are implemented within safety systems, they should be justified.

  18. The SCALE Web site: Resources for the worldwide nuclear criticality safety community

    International Nuclear Information System (INIS)

    Bowman, S.M.

    2000-01-01

    The Standardized Computer Analyses for Licensing Evaluations (SCALE) computer software system developed at Oak Ridge National Laboratory (ORNL) is widely used and accepted around the world for criticality safety analyses. SCALE includes the well-known KENO V.a and KENO VI three-dimensional Monte Carlo criticality computer codes. For several years, the SCALE staff at ORNL has maintained a Web site to provide information and support to sponsors and users in the worldwide criticality safety community. The SCALE WEB site is located at www.cped.ornl.gov/scale and provides information in the following areas: 1. important notices to users; 2. SCALE Users Electronic Notebook; 3. current and past issues of the SCALE Newsletter; 4. verification and validation (V and V) and benchmark reports; 5. download updates, utilities, and V and V input files; 6. SCALE training course information; 7. SCALE Manual on-line; 8. overview of SCALE system; 9. how to install and run SCALE; 10. SCALE quality assurance documents; and 11. nuclear resources on the Internet

  19. Climate and climate-related issues for the safety assessment SR-Site

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    The purpose of this report is to document current scientific knowledge on climate and climate-related conditions, relevant to the long-term safety of a KBS-3 repository, to a level required for an adequate treatment in the safety assessment SR-Site. The report also presents a number of dedicated studies on climate and selected climate-related processes of relevance for the assessment of long term repository safety. Based on this information, the report presents a number of possible future climate developments for Forsmark, the site selected for building a repository for spent nuclear fuel in Sweden (Figure 1-1). The presented climate developments are used as basis for the selection and analysis of SR-Site safety assessment scenarios in the SR-Site main report /SKB 2011/. The present report is based on research conducted and published by SKB as well as on research reported in the general scientific literature

  20. Climate and climate-related issues for the safety assessment SR-Site

    International Nuclear Information System (INIS)

    2010-12-01

    The purpose of this report is to document current scientific knowledge on climate and climate-related conditions, relevant to the long-term safety of a KBS-3 repository, to a level required for an adequate treatment in the safety assessment SR-Site. The report also presents a number of dedicated studies on climate and selected climate-related processes of relevance for the assessment of long term repository safety. Based on this information, the report presents a number of possible future climate developments for Forsmark, the site selected for building a repository for spent nuclear fuel in Sweden (Figure 1-1). The presented climate developments are used as basis for the selection and analysis of SR-Site safety assessment scenarios in the SR-Site main report /SKB 2011/. The present report is based on research conducted and published by SKB as well as on research reported in the general scientific literature

  1. Survey and evaluation of inherent safety characteristics and passive safety systems for use in probabilistic safety analyses

    International Nuclear Information System (INIS)

    Wetzel, N.; Scharfe, A.

    1998-01-01

    The present report examines the possibilities and limits of a probabilistic safety analysis to evaluate passive safety systems and inherent safety characteristics. The inherent safety characteristics are based on physical principles, that together with the safety system lead to no damage. A probabilistic evaluation of the inherent safety characteristic is not made. An inventory of passive safety systems of accomplished nuclear power plant types in the Federal Republic of Germany was drawn up. The evaluation of the passive safety system in the analysis of the accomplished nuclear power plant types was examined. The analysis showed that the passive manner of working was always assumed to be successful. A probabilistic evaluation was not performed. The unavailability of the passive safety system was determined by the failure of active components which are necessary in order to activate the passive safety system. To evaluate the passive safety features in new concepts of nuclear power plants the AP600 from Westinghouse, the SBWR from General Electric and the SWR 600 from Siemens, were selected. Under these three reactor concepts, the SWR 600 is specially attractive because the safety features need no energy sources and instrumentation in this concept. First approaches for the assessment of the reliability of passively operating systems are summarized. Generally it can be established that the core melt frequency for the passive concepts AP600 and SBWR is advantageous in comparison to the probabilistic objectives from the European Pressurized Water Reactor (EPR). Under the passive concepts is the SWR 600 particularly interesting. In this concept the passive systems need no energy sources and instrumentation, and has active operational systems and active safety equipment. Siemens argues that with this concept the frequency of a core melt will be two orders of magnitude lower than for the conventional reactors. (orig.) [de

  2. Simplifying documentation while approaching site closure: integrated health and safety plans as documented safety analysis

    International Nuclear Information System (INIS)

    Brown, Tulanda

    2003-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). By isolating any remediation activities that deal with Enriched Restricted Materials, the SBRs and PRs assure that the hazard categories of former nuclear facilities undergoing remediation remain less than Nuclear. These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 150 structures, including six major nuclear production plants. This paper presents the FCP method for maintaining safety basis documentation, using the D and D I-HASP as an example

  3. Preliminary safety evaluation for the plutonium stabilization and packaging system

    International Nuclear Information System (INIS)

    Shapley, J.E.

    1997-01-01

    This Preliminary Safety Evaluation (PSE) describes and analyzes the installation and operation of the Plutonium Stabilization and Packaging System (SPS) at the Plutonium Finishing Plant (PFP). The SPS is a combination of components required to expedite the safe and timely storage of Plutonium (Pu) oxide. The SPS program will receive site Pu packages, process the Pu for storage, package the Pu into metallic containers, and safely store the containers in a specially modified storage vault. The location of the SPS will be in the 2736- ZB building and the storage vaults will be in the 2736-Z building of the PFP, as shown in Figure 1-1. The SPS will produce storage canisters that are larger than those currently used for Pu storage at the PFP. Therefore, the existing storage areas within the PFP secure vaults will require modification. Other modifications will be performed on the 2736-ZB building complex to facilitate the installation and operation of the SPS

  4. Planning for investigation and evaluation of potential repository sites in Sweden

    International Nuclear Information System (INIS)

    Almen, K.E.; Stroem, A.

    1998-01-01

    The present stage of siting of the Swedish Deep Repository for spent nuclear fuel involves general siting studies on national and regional scales and feasibility studies on a municipal scale. Based on these studies, two areas will be selected for surface-based site investigations. The geoscientific site information will be used in the site evaluation process, in which performance and safety assessments and design studies are the major activities, in combination with geoscientific characterization. The safety report and EIA document from the site investigation stage will be the most important documents in the application for the siting permit and the permit to construct the deep repository. Detailed characterization will then verify the suitability of the selected site. The programme for geoscientific site investigations is based on experience from more than 20 years of field studies in several SKB projects, such as the Study Site Investigations , the Stripa Project, and the Aespoe Hard Rock Laboratory. The strategies and methodologies developed, implemented and verified within the Aespoe HRL are a very important source of information and know-how for the development of the site investigation programme. The investigations will produce geoscientific models that include all information needed to analyze the long-term safety of a deep repository located in and adapted to the geological conditions of the rock. The type of geoscientific information needed for performance and safety assessment, layout and design, environmental studies and for fundamental geoscientific understanding has been specified and compiled in a 'parameter' report. The general strategy is that performance assessment, layout and design studies will be conducted in parallel with the geoscientific investigations. Information will be transferred at logical occasions, when decisions have to be taken and when feedback is desirable for new investigation steps. The role of the geoscientific evaluation is to

  5. Providing Nuclear Criticality Safety Analysis Education through Benchmark Experiment Evaluation

    International Nuclear Information System (INIS)

    Bess, John D.; Briggs, J. Blair; Nigg, David W.

    2009-01-01

    One of the challenges that today's new workforce of nuclear criticality safety engineers face is the opportunity to provide assessment of nuclear systems and establish safety guidelines without having received significant experience or hands-on training prior to graduation. Participation in the International Criticality Safety Benchmark Evaluation Project (ICSBEP) and/or the International Reactor Physics Experiment Evaluation Project (IRPhEP) provides students and young professionals the opportunity to gain experience and enhance critical engineering skills.

  6. PROBLEMS OF APPLYING FIXED FORMULAE TO SAFETY CRITERIA AND SITE SELECTION

    Energy Technology Data Exchange (ETDEWEB)

    Davis, W. K.

    1963-10-15

    The problem of developing a formula or calculation procedure for that could more-or-less automatically indicate whether or not a nuclear plant would be considered safe at a particular location is discussed. The difficulties and impossibilities of any sach formula for making decisions on siting and safety involving large amounts of money and public safety are considered. (P.C.H.)

  7. Guide for understanding and evaluation of safety culture

    International Nuclear Information System (INIS)

    2008-01-01

    This report was the guide of understanding and evaluation of safety culture. Operator's activities for enhancement of safety culture in nuclear installations became an object of safety regulation in the management system. Evaluation of operator's activities (including top management's involvement) to prevent degradation of safety culture and organization climate in daily works needed understanding of safety culture and diversity of operator's activities. This guide was prepared to check indications of degradation of safety culture and organization climate in operator's activities in daily works and encourage operator's activities to enhance safety culture improvement and good practice. Comprehensive evaluation of operator's activities to prevent degradation of safety culture and organization climate would be performed from the standpoints of 14 safety culture elements such as top management commitment, clear plan and implementation of upper manager, measures to avoid wrong decision making, questioning attitude, reporting culture, good communications, accountability and openness, compliance, learning system, activities to prevent accidents or incidents beforehand, self-assessment or third party evaluation, work management, change management and attitudes/motivation. Element-wise examples and targets for evaluation were attached with evaluation check tables. (T. Tanaka)

  8. Safety leadership at construction sites: the importance of rule-oriented and participative leadership.

    Science.gov (United States)

    Grill, Martin; Pousette, Anders; Nielsen, Kent; Grytnes, Regine; Törner, Marianne

    2017-07-01

    Objectives The construction industry accounted for >20% of all fatal occupational accidents in Europe in 2014. Leadership is an essential antecedent to occupational safety. The aim of the present study was to assess the influence of transformational, active transactional, rule-oriented, participative, and laissez-faire leadership on safety climate, safety behavior, and accidents in the Swedish and Danish construction industry. Sweden and Denmark are similar countries but have a large difference in occupational accidents rates. Methods A questionnaire study was conducted among a random sample of construction workers in both countries: 811 construction workers from 85 sites responded, resulting in site and individual response rates of 73% and 64%, respectively. Results The results indicated that transformational, active transactional, rule-oriented and participative leadership predict positive safety outcomes, and laissez-faire leadership predict negative safety outcomes. For example, rule-oriented leadership predicts a superior safety climate (β=0.40, Pleadership on workers' safety behavior was moderated by the level of participative leadership (β=0.10, Pleadership behaviors on safety outcomes were largely similar in Sweden and Denmark. Rule-oriented and participative leadership were more common in the Swedish than Danish construction industry, which may partly explain the difference in occupational accident rates. Conclusions Applying less laissez-faire leadership and more transformational, active transactional, participative and rule-oriented leadership appears to be an effective way for construction site managers to improve occupational safety in the industry.

  9. Safety Evaluation of Elderly Laparoscopic Cholecystectomy

    Directory of Open Access Journals (Sweden)

    Bijan Khorasani

    2008-10-01

    Full Text Available Objectives: The most common indication for abdominal surgery in elderly (65 & older is gallstone disease.The elderly are more prone to complication of such surgery due to their other co-morbidity and thus they may benefit mostly from a safer method of surgical procedure. The purpose of this study was to evaluate the safety and outcome of laparoscopic cholecystectomy in elderly compare to the conventional method. Methods & Materials: Via prospective study from June 2005 to March 2008 included all patient older than 60 years of age who underwent cholecystectomy by open (Group A and laparoscopic (Group B method in Milad Hospital.The demographic data (sex age, American Society of Anesthesiologists’ (ASA score, postoperative mortality morbidity, length of stay and operative time were recorded for each patient and were compared between two methods. Data of patient’s analysis by SPSS with chi-square and t test. Results: The study included 311 elderlies (34% men and 66% women. Hundred fifty-seven patients underwent open cholecystectomy; 154 patients underwent laparoscopic cholecystectomy. The mean age was 7141 years. The outcome in group B (laparoscopic included: morality 0%, morbidity 2%, postoperative hospital stay 1 days, mean operation time was 40 minutes. In group A(open: mortality and morbidity rate were 21% and 12% respectively with postoperative hospital stay 331 days and similar operation time as group A. Conclusion: Laparoscopic cholecystectomy is the gold standard treatment and safe procedure in elderly patient and aging is not considered to be a contraindication laparoscopic surgery in such patients.

  10. Construction Site Workers’ Awareness on Using Safety Equipment: Case Study

    Directory of Open Access Journals (Sweden)

    Ulang N. Md

    2014-01-01

    Full Text Available Construction sector is an important sector and contributed significantly to national development. However, this sector poses higher risk to accident. This is due to fact that construction site can be considered as a dangerous zone to workers and to the public. Due to the variety of cases occurs on site, the contractor will usually have to pay the cost related to accidents in the form of higher insurance premium. Despite various measures, accidents still occur at construction sites. Personal Protective Equipment (PPE is one of the important means to protect the wearer from hazards in the workplace. Since this equipment is the last frontier of the wearer from worksite hazards, it is important to select it based on the job scope and the intended protection. Therefore, this study was formulated to find out the level of knowledge and awareness of construction workers on PPE usage. It was also important to know what make the workers would want or do not want to use the PPE. It was found in this study that the level of awareness and knowledge among workers on the proper use of PPE is moderate. Construction sites accident can be further be reduced with proper implementation of PPE voluntarily by all workers.

  11. Health and safety conditions of building maintenance sites in Nigeria

    African Journals Online (AJOL)

    To identify the microorganisms, bulk samples were collected on timber buildings classified as maintenance sites over the country and then identify the microorganisms available using the cultivation technique. Eight hundred and fifty nutrient and Sabouraud dextrose agar dishes were prepared. The nutrient agar dishes were ...

  12. Influenza vaccines: Evaluation of the safety profile

    Science.gov (United States)

    Trombetta, Claudia Maria; Gianchecchi, Elena; Montomoli, Emanuele

    2018-01-01

    ABSTRACT The safety of vaccines is a critical factor in maintaining public trust in national vaccination programs. Vaccines are recommended for children, adults and elderly subjects and have to meet higher safety standards, since they are administered to healthy subjects, mainly healthy children. Although vaccines are strictly monitored before authorization, the possibility of adverse events and/or rare adverse events cannot be totally eliminated. Two main types of influenza vaccines are currently available: parenteral inactivated influenza vaccines and intranasal live attenuated vaccines. Both display a good safety profile in adults and children. However, they can cause adverse events and/or rare adverse events, some of which are more prevalent in children, while others with a higher prevalence in adults. The aim of this review is to provide an overview of influenza vaccine safety according to target groups, vaccine types and production methods. PMID:29297746

  13. Biosphere analyses for the safety assessment SR-Site - synthesis and summary of results

    International Nuclear Information System (INIS)

    Saetre, Peter

    2010-12-01

    This report summarises nearly 20 biosphere reports and gives a synthesis of the work performed within the SR-Site Biosphere project, i.e. the biosphere part of SR-Site. SR-Site Biosphere provides the main project with dose conversion factors (LDFs), given a unit release rate, for calculation of human doses under different release scenarios, and assesses if a potential release from the repository would have detrimental effects on the environment. The intention of this report is to give sufficient details for an overview of methods, results and major conclusions, with references to the biosphere reports where methods, data and results are presented and discussed in detail. The philosophy of the biosphere assessment was to make estimations of the radiological risk for humans and the environment as realistic as possible, based on the knowledge of present-day conditions at Forsmark and the past and expected future development of the site. This was achieved by using the best available knowledge, understanding and data from extensive site investigations from two sites. When sufficient information was not available, uncertainties were handled cautiously. A systematic identification and evaluation of features and processes that affect transport and accumulation of radionuclides at the site was conducted, and the results were summarised in an interaction matrix. Data and understanding from the site investigation was an integral part of this work, the interaction matrix underpinned the development of the radionuclide model used in the biosphere assessment. Understanding of the marine, lake and river and terrestrial ecosystems at the site was summarized in a conceptual model, and relevant features and process have been characterized to capture site specific parameter values. Detailed investigations of the structure and history of the regolith at the site and simulations of regolith dynamics were used to describe the present day state at Forsmark and the expected development of

  14. Nuclear power plant site evaluation using site population-meterology factor

    International Nuclear Information System (INIS)

    Rho, B.H.; Kang, C.H.

    1982-01-01

    In this paper, as a site evaluation technique, SPNF(Site Population Neteorology Factor) which is modified from SPF(Site Population Factor) of the USNRC model, is defined from site population and meteorology data in order to consider the radiological impacts to the population at large from the atmospheric dispersion of the radioactive effluents released during routine plant operation as well as accidental conditions. The SPMF model proved its propriety from the comparison of SPMF and SPF for Kori site. The relative suitability of Korean sites to the U.S. sites have been also examined using SPF. (Author)

  15. Methodology of site generation for evaluation of the behaviour of radioactive waste storage

    International Nuclear Information System (INIS)

    Ruiz Rivas, C.; Eguilior Diez, S.

    1997-01-01

    The present report summarizes the purpose of methodology for the site generation in the evaluation of high-level radioactive waste storage for long-term. This work is developed into the project Safety analysis long-term of high-level radioactive waste. This project is carried on for CIEMAT and ENRESA

  16. The impact of WASH-1400 on reactor safety evaluation

    International Nuclear Information System (INIS)

    Tanguy, P.Y.

    1976-01-01

    Trends in reactor safety evaluation in France following the publication of WASH-1400 (the Rasmussen Report) are presented. What is called 'the meteorite case' is first schematically presented as follows: WASH-1400 shows nuclear risk equivalent to meteorite risk and reasonable corrections cannot make many orders of magnitude, consequently present safety rules are adequate. The very impact of WASH-1400 on safety approach is then discussed as for: assistance to deterministic safety analysis, introduction of probabilistic safety criteria, acceptable level of risk, and the use of results in research and reactor operating experience

  17. Systematic safety evaluation of old nuclear power plants

    International Nuclear Information System (INIS)

    Dredemis, G.; Fourest, B.

    1984-01-01

    The French safety authorities have undertaken a systematic evaluation of the safety of old nuclear power plants. Apart from a complete revision of safety documents (safety analysis report, general operating rules, incident and accident procedures, internal emergency plan, quality organisation manual), this examination consisted of analysing the operating experience of systems frequently challenged and a systematic examination of the safety-related systems. This paper is based on an exercise at the Ardennes Nuclear Power Plant which has been in operation for 15 years. This paper also summarizes the main surveys and modifications relating to this power plant. (orig.)

  18. SRTC criticality safety technical review: Nuclear Criticality Safety Evaluation 93-04 enriched uranium receipt

    International Nuclear Information System (INIS)

    Rathbun, R.

    1993-01-01

    Review of NMP-NCS-930087, open-quotes Nuclear Criticality Safety Evaluation 93-04 Enriched Uranium Receipt (U), July 30, 1993, close quotes was requested of SRTC (Savannah River Technology Center) Applied Physics Group. The NCSE is a criticality assessment to determine the mass limit for Engineered Low Level Trench (ELLT) waste uranium burial. The intent is to bury uranium in pits that would be separated by a specified amount of undisturbed soil. The scope of the technical review, documented in this report, consisted of (1) an independent check of the methods and models employed, (2) independent HRXN/KENO-V.a calculations of alternate configurations, (3) application of ANSI/ANS 8.1, and (4) verification of WSRC Nuclear Criticality Safety Manual procedures. The NCSE under review concludes that a 500 gram limit per burial position is acceptable to ensure the burial site remains in a critically safe configuration for all normal and single credible abnormal conditions. This reviewer agrees with that conclusion

  19. Cooperation of the site and public fire and safety services in case of an incident

    International Nuclear Information System (INIS)

    Bauch, M.

    1997-01-01

    This report describes the cooperation between the site and the public fire and safety services in case of an incident. As an example, the measures and facilities of the Hoechst site of the Hoechst AG and the organisational and technical background are presented. (orig.) [de

  20. Strategies for effective management of health and safety in confined site construction

    Directory of Open Access Journals (Sweden)

    John Spillane

    2013-12-01

    Full Text Available Purpose: The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. Design/Methodology/Approach: This is achieved by utilising individual interviews, focus groups discussion on selected case studies of confined construction sites, coupled with a questionnaire survey. Findings: The top five key strategies include (1 Employ safe system of work plans to mitigate personnel health and safety issues; (2 Inform personnel, before starting on-site, of the potential issues using site inductions; (3 Effective communication among site personnel; (4 Draft and implement an effective design site layout prior to starting on-site; and (5 Use of banksman (traffic co-ordinator to segregate personnel from vehicular traffic. Practical Implication: The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. Originality/Value: This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.

  1. Preliminary Safety Analysis of the Gorleben Site: Safety Concept and Application to Scenario Development Based on a Site-Specific Features, Events and Processes (FEP) Database - 13304

    Energy Technology Data Exchange (ETDEWEB)

    Moenig, Joerg; Beuth, Thomas; Wolf, Jens [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, Theodor-Heuss-Str. 4, D-38122 Braunschweig (Germany); Lommerzheim, Andre [DBE TECHNOLOGY GmbH, Eschenstr. 55, D-31224 Peine (Germany); Mrugalla, Sabine [Federal Institute for Geosciences and Natural Resources (BGR), Stilleweg 2, D-30655 Hannover (Germany)

    2013-07-01

    Based upon the German safety criteria, released in 2010 by the Federal Ministry of the Environment (BMU), a safety concept and a safety assessment concept for the disposal of heat-generating high-level waste have both been developed in the framework of the preliminary safety case for the Gorleben site (Project VSG). The main objective of the disposal is to contain the radioactive waste inside a defined rock zone, which is called containment-providing rock zone. The radionuclides shall remain essentially at the emplacement site, and at the most, a small defined quantity of material shall be able to leave this rock zone. This shall be accomplished by the geological barrier and a technical barrier system, which is required to seal the inevitable penetration of the geological barrier by the construction of the mine. The safe containment has to be demonstrated for probable and less probable evolutions of the site, while evolutions with very low probability (less than 1 % over the demonstration period of 1 million years) need not to be considered. Owing to the uncertainty in predicting the real evolution of the site, plausible scenarios have been derived in a systematic manner. Therefore, a comprehensive site-specific features, events and processes (FEP) data base for the Gorleben site has been developed. The safety concept was directly taken into account, e.g. by identification of FEP with direct influence on the barriers that provide the containment. No effort was spared to identify the interactions of the FEP, their probabilities of occurrence, and their characteristics (values). The information stored in the data base provided the basis for the development of scenarios. The scenario development methodology is based on FEP related to an impairment of the functionality of a subset of barriers, called initial barriers. By taking these FEP into account in their probable characteristics the reference scenario is derived. Thus, the reference scenario describes a

  2. Insights from the U.S. department of Energy plant safety evaluation program of VVER and RBMK reactors

    International Nuclear Information System (INIS)

    Petri, M.C.; Binder, J.L.; Pasedag, W.F.

    2001-01-01

    Throughout the years 1990 the U.S. Department of Energy has worked build capability in countries of the former Soviet Union to assess the safety of their VVER and RBMK reactors. Through this Plant Safety Evaluation Program, deterministic and probabilistic analyses have been used to provide a documented plant risk profile to support safe plant operation and to set priorities for safety upgrades. Work has been sponsored at thirteen nuclear power plant sites in eight countries. The Plant Safety Evaluation Program has resulted in immediate and long-term safety benefits for the Soviet-designed nuclear plants. (author)

  3. Perspectives on nuclear material safety management methods at DOE sites

    International Nuclear Information System (INIS)

    Hyder, M.L.

    1997-01-01

    The management of nuclear materials, and fissile materials in particular, at the USDOE facilities is undergoing significant changes. These result in large part from decreasing requirements for these materials in the US weapons program. Not only is new production no longer required, but returns must be handled and safely stored. Eventually surplus fissile material will be used for power production, or else put into a form suitable for long term disposition. In the meanwhile concentrates must be stored with protection against releases of radioactive material to the environment, and also against theft or deliberate dispersion. In addition, cleaning up large volumes of materials contaminated with fissile isotopes will be a major activity, and there will also be some quantity of spent fuel containing enriched uranium that cannot readily be processed. All these activities pose safety problems, some of which are addressed here

  4. Canada's Deep Geological Repository for Used Nuclear Fuel - Geo-scientific Site Evaluation Process - 13117

    International Nuclear Information System (INIS)

    Blyth, Alec; Ben Belfadhel, Mahrez; Hirschorn, Sarah; Hamilton, Duncan; McKelvie, Jennifer

    2013-01-01

    The Nuclear Waste Management Organization (NWMO) is responsible for implementing Adaptive Phased Management (APM), the approach selected by the Government of Canada for long-term management of used nuclear fuel generated by Canadian nuclear reactors. The ultimate objective of APM is the centralized containment and isolation of Canada's used nuclear fuel in a Deep Geological Repository in a suitable rock formation at a depth of approximately 500 meters (m) (1,640 feet [ft]). In May 2010, the NWMO published a nine-step site selection process that serves as the road map to decision-making on the location for the deep geological repository. The safety and appropriateness of any potential site will be assessed against a number of factors, both technical and social in nature. The selected site will be one that can be demonstrated to be able to safely contain and isolate used nuclear fuel, protecting humans and the environment over the very long term. The geo-scientific suitability of potential candidate sites will be assessed in a stepwise manner following a progressive and thorough site evaluation process that addresses a series of geo-scientific factors revolving around five safety functions. The geo-scientific site evaluation process includes: Initial Screenings; Preliminary Assessments; and Detailed Site Evaluations. As of November 2012, 22 communities have entered the site selection process (three in northern Saskatchewan and 18 in northwestern and southwestern Ontario). (authors)

  5. Perspective on safety case to support a possible site recommendation decision

    International Nuclear Information System (INIS)

    Gil, A.V.; Gamble, R.P.

    2002-01-01

    The mission of the US Department of Energy (DOE) is to provide the basis for a national decision regarding the development of a geological repository for spent nuclear fuel and high-level radioactive waste at the Yucca Mountain site in Nevada. There are a number of steps in the decision process defined by US law that must be completed prior to development of a repository at this site. The DOE's focus is currently on the first two steps in this process: characterization of the site to support a determination by the DOE on whether the site is suitable for a geologic repository and a decision by the Secretary of Energy (the Secretary) on whether to recommend to the President that the site be approved for a repository. To enhance the confidence of multiple audiences in the basis for these actions, and to provide a basis for subsequent action by the President and the US Congress, information supporting the decision process must include the elements of a safety case consistent with the statutory and regulatory framework for these decisions. The idea of a safety case is to broaden the basis for confidence by decision-makers and the public in conclusions about safety. A safety case should cite multiple lines of evidence, or reasoning, beyond the results of a safety assessment to support the demonstration of safety, which includes compliance with applicable safety criteria. The multiple lines of evidence should show the basis for confidence in safety. To be most effective, such evidence requires information not directly used in the safety assessment. (author)

  6. Safety-related site characteristics - a relative comparison of the Forsmark reference areas

    International Nuclear Information System (INIS)

    Winberg, Anders

    2010-12-01

    SKB has over the years from 2002 to 2008 conducted site investigations in Forsmark and Laxemar, with associated site modeling, design and safety analysis. In mid-2009 Forsmark was selected on the basis of analysis made as site for a future repository for spent nuclear fuel. Based on defined safety-related geoscientific location factors data from Forsmark are compared in relative terms with data from a number of locations in Sweden, previously studied by SKB. The factors compared include: the rock's composition and structures, future climate evolution, rock mechanical conditions, earthquakes, groundwater flow, groundwater composition, delay of solutes, and the ability to characterize and describe the location. Past comparisons of these properties for the selected sites show that none of these sites collectively show any significant benefit over Forsmark site for a repository. This does not preclude that there may be places on the basis of an overall assessment of geoscientific location factors could be equivalent to Forsmark

  7. Patient Safety in Spine Surgery: Regarding the Wrong-Site Surgery

    OpenAIRE

    Lee, Seung-Hwan; Kim, Ji-Sup; Jeong, Yoo-Chul; Kwak, Dae-Kyung; Chun, Ja-Hae; Lee, Hwan-Mo

    2013-01-01

    Patient safety regarding wrong site surgery has been one of the priority issues in surgical fields including that of spine care. Since the wrong-side surgery in the DM foot patient was reported on a public mass media in 1996, the wrong-site surgery issue has attracted wide public interest as regarding patient safety. Despite the many wrong-site surgery prevention campaigns in spine care such as the operate through your initial program by the Canadian Orthopaedic Association, the sign your sit...

  8. Deepening om Safety culture Auto evaluation

    International Nuclear Information System (INIS)

    Lopez Churruca, I.; Buedo Jimenez, J. L.

    2009-01-01

    The concept of safety culture used in nuclear forums refers to the series of actions aimed at guaranteeing that safety issues in nuclear power plants are adequately addressed. The activities to which this concept refers have been gradually extended over the years so that, today, they encompass the whole organizations structure. In other words, the safety culture implies that all positions in the organizational structure perform their tasks with a level of attention such that all their senses are focused on them. And this performance is what leads us to excellence in plant operation. In addition, the implementation of a self-assessment system in the Cofrentes Nuclear Power Plant of its activities and processes has resulted in the identification of expectations on the basis of which we can identify strengths and weaknesses, enabling us to leverage the former and correct the latter. (Author)

  9. Evaluation of safety management in an Appliances manufacturing company

    Directory of Open Access Journals (Sweden)

    F. Golbabaei

    2015-01-01

    Full Text Available Introduction: Prevention of accidents and work related diseases, are not allowed regardless of the safety of employees, customers, contractors and other persons. Assessment of individual safety management activities could reduce many losses. Present study aimed to evaluate the safety management of a household appliance manufacturing company.  .Material and Method: This study has done in a household appliance manufacturing company in Damavand city. Two questionnaires were firstly designed based on the weighted scores. The questionnaire 1 consisted of 4 indicators: Safety of machinery, Electrical safety, Risk assessment and Fire safety. Questionnaire 2 consisted of 11 sub indicators. Both questionnaires were completed by 30 HSE experts and supervisors. Reliability of questionnaires was based on cronbachs alpha coefficient. the safety status of each unit was determined and scored using information acquired by the questionnaires. Lastly, the safety of the entire company was determined.  .Result: Results showed that in safety management: the pressing and store house were in a good range of 66.66 and 60.12 points. Powder painting, enameling, laboratory were in a average range of 56.25, 55.92 and 54.15 points. Assembling and door storage were in a week range of 46.06 points.  .Conclusion: The findings showed that the safety status in the studied appliances company is in average range with 55.45 points. Therefore, it is recommended that the safety indicators should be improved for the betterment of the safety management in the company.

  10. Preliminary Safety Analysis of the Gorleben Site: Geological Database - 13300

    International Nuclear Information System (INIS)

    Weber, Jan Richard; Mrugalla, Sabine; Dresbach, Christian; Hammer, Joerg

    2013-01-01

    The Gorleben salt dome is 4 km wide and nearly 15 km long. It is composed of different salt rock types of the Zechstein (Upper Permian) series and extends to the Zechstein basis in a depth of more than 3 km. In the course of the salt dome formation the salt was moved several kilometers. During the uplift of the salt the initially plane-bedded strata of the Zechstein series were extensively folded. In this process anhydrite as a competent layer was broken to isolated blocks. In the core of the salt dome the Hauptsalz, which is characterized by a particularly high creeping capacity, forms a homogeneous halite body with a volume of several cubic kilometres. The Hauptsalz contains gaseous and liquid hydrocarbons in separated zones of decimeter to meter dimensions. The overall hydrocarbon content is far below 0.01 %. At the flanks the salt dome consists of salt rocks with lower creeping capacities. Brine reservoirs with fluid volumes in the range of liters to hundreds of cubic meters exist in certain regions of this part of the salt dome. The water content of the Hauptsalz is below 0.02 %. Interconnected pores do not exist in the salt rock outside of fluid bearing or fractured areas, i.e. the salt rock is impermeable. The exploration of the Gorleben site as a potential site for a HLW-repository started in 1979 and is still in progress. To date no scientific findings contest the suitability of the site for a safe HLW-repository. (authors)

  11. Field Guide for Evaluating Cottonwood Sites

    Science.gov (United States)

    W.M. Broadfoot

    1960-01-01

    Two field methods have been developed at the Stoneville Research Center for estimating the capability of Midsouth soils to grow eastern cottonwood (Populus deltoides Bartr.). Data for establishing the procedures were collected from 155 plots* at the locations indicated in Figure 1.The methods give site index-that is, tree-growing...

  12. Criticality safety evaluation report for K Basin filter cartridges

    International Nuclear Information System (INIS)

    Schwinkendorf, K.N.

    1995-01-01

    A criticality safety evaluation of the K Basin filter cartridge assemblies has been completed to support operations without a criticality alarm system. The results show that for normal operation, the filter cartridge assembly is far below the safety limit of k eff = 0.95, which is applied to plutonium systems at the Hanford Site. During normal operating conditions, uranium, plutonium, and fission and corrosion products in solution are continually accumulating in the available void spaces inside the filter cartridge medium. Currently, filter cartridge assemblies are scheduled to be replaced at six month intervals in KE Basin, and at one year intervals in KW Basin. According to available plutonium concentration data for KE Basin and data for the U/Pu ratio, it will take many times the six-month replacement time for sufficient fissionable material accumulation to take place to exceed the safety limit of k eff = 0.95, especially given the conservative assumption that the presence of fission and corrosion products is ignored. Accumulation of sludge with a composition typical of that measured in the sand filter backwash pit will not lead to a k eff = 0.95 value. For off-normal scenarios, it would require at least two unlikely, independent, and concurrent events to take place before the k eff = 0.95 limit was exceeded. Contingencies considered include failure to replace the filter cartridge assemblies at the scheduled time resulting in additional buildup of fissionable material, the loss of geometry control from the filter cartridge assembly breaking apart and releasing the individual filter cartridges into an optimal configuration, and concentrations of plutonium at U/Pu ratios less than measured data for KE Basin, typically close to 400 according to extensive measurements in the sand filter backwash pit and plutonium production information

  13. Criticality safety benchmark evaluation project: Recovering the past

    Energy Technology Data Exchange (ETDEWEB)

    Trumble, E.F.

    1997-06-01

    A very brief summary of the Criticality Safety Benchmark Evaluation Project of the Westinghouse Savannah River Company is provided in this paper. The purpose of the project is to provide a source of evaluated criticality safety experiments in an easily usable format. Another project goal is to search for any experiments that may have been lost or contain discrepancies, and to determine if they can be used. Results of evaluated experiments are being published as US DOE handbooks.

  14. SAFETY

    CERN Multimedia

    Niels Dupont

    2013-01-01

    CERN Safety rules and Radiation Protection at CMS The CERN Safety rules are defined by the Occupational Health & Safety and Environmental Protection Unit (HSE Unit), CERN’s institutional authority and central Safety organ attached to the Director General. In particular the Radiation Protection group (DGS-RP1) ensures that personnel on the CERN sites and the public are protected from potentially harmful effects of ionising radiation linked to CERN activities. The RP Group fulfils its mandate in collaboration with the CERN departments owning or operating sources of ionising radiation and having the responsibility for Radiation Safety of these sources. The specific responsibilities concerning "Radiation Safety" and "Radiation Protection" are delegated as follows: Radiation Safety is the responsibility of every CERN Department owning radiation sources or using radiation sources put at its disposition. These Departments are in charge of implementing the requi...

  15. Alternative off-site power supply improves nuclear power plant safety

    International Nuclear Information System (INIS)

    Gjorgiev, Blaže; Volkanovski, Andrija; Kančev, Duško; Čepin, Marko

    2014-01-01

    Highlights: • Additional power supply for mitigation of the station blackout event in NPP is used. • A hydro power plant is considered as an off-site alternative power supply. • An upgrade of the probabilistic safety assessment from its traditional use is made. • The obtained results show improvement of nuclear power plant safety. - Abstract: A reliable power system is important for safe operation of the nuclear power plants. The station blackout event is of great importance for nuclear power plant safety. This event is caused by the loss of all alternating current power supply to the safety and non-safety buses of the nuclear power plant. In this study an independent electrical connection between a pumped-storage hydro power plant and a nuclear power plant is assumed as a standpoint for safety and reliability analysis. The pumped-storage hydro power plant is considered as an alternative power supply. The connection with conventional accumulation type of hydro power plant is analysed in addition. The objective of this paper is to investigate the improvement of nuclear power plant safety resulting from the consideration of the alternative power supplies. The safety of the nuclear power plant is analysed through the core damage frequency, a risk measure assess by the probabilistic safety assessment. The presented method upgrades the probabilistic safety assessment from its common traditional use in sense that it considers non-plant sited systems. The obtained results show significant decrease of the core damage frequency, indicating improvement of nuclear safety if hydro power plant is introduced as an alternative off-site power source

  16. Reminder: Alcohol abuse, road traffic and safety on the site

    CERN Multimedia

    HSE Unit

    2011-01-01

    You are reminded that: - the legal blood alcohol limit in force under the Host States’ traffic regulations (0.5 g per 1000 ml of blood) also applies on the CERN site; - the consumption of alcohol is forbidden during working hours and is only tolerated in the restaurants at certain times, unless an exception is granted for special events (Operational Circular No. 8); - failure to observe these rules may result in disciplinary action by the Organization, independently of any sanctions that may be applicable pursuant to the road traffic regulations of the Host State concerned. Furthermore, the Reception and Access Control Service, the site guards and the Fire Brigade have been instructed to stop any driver in an obvious state of intoxication and to ask him/her to abandon the vehicle on the spot. In case of disagreement, they may also suggest that he/she submits to a voluntary blood alcohol level test at the CERN Medical Service or Fire Brigade. They will also stop and question any obviously intoxicate...

  17. Alcohol abuse, road traffic and safety on the site

    CERN Multimedia

    DSU Department

    2008-01-01

    In the light of the serious road accident that occurred on 3 February 2008, you are reminded that: the legal blood alcohol limit in force under the Host States’ traffic regulations (0.5 g per 1000 ml of blood) also applies on the CERN site; the consumption of alcohol is forbidden during working hours and is only tolerated in the restaurants at certain times, unless an exception is granted for special events; failure to observe these rules may result in disciplinary action by the Organization, independently of any sanctions that may be applicable pursuant to the road traffic regulations of the Host State concerned. Furthermore, the Reception and Access Control Service, the site guards and the Fire Brigade have been instructed to stop any driver in an obvious state of intoxication and to ask him to abandon his vehicle on the spot. In case of disagreement, they may also suggest that he submits to a voluntary blood alcohol level test at the CERN Medical Service or Fire Brigade...

  18. Philosophy of safety evaluation on fast breeder reactor

    International Nuclear Information System (INIS)

    1981-01-01

    This is the report submitted from the special subcommittee on reactor safety standard to the Nuclear Safety Commission on October 14, 1980, and it was decided to temporarily apply this concept to the safety examination on fast breeder reactors. The examination and discussion of this report were performed by taking the prototype reactor ''Monju'' into consideration, which is to be the present target, referring to the philosophy of the safety evaluation on fast breeder reactors in foreign countries and based on the experiences in the fast experimental reactor ''Joyo''. The items applicable to the safety evaluation for liquid metal-cooled fast breeder reactors (LMFBR) as they are among the existing safety examination guidelines are applied. In addition to the existing guidelines, the report describes the matters to be considered specifically for core, fuel, sodium, sodium void, reactor shut-down system, reactor coolant boundary, cover gas boundary and others, intermediate cooling system, removal of decay heat, containment vessels, high temperature structures, and aseismatic property in the safety design of LMFBR's. For the safety evaluation for LMFBR's, the abnormal transient changes in operation and the phenomena to be evaluated as accidents are enumerated. In order to judge the propriety of the criteria of locating LMFBR facilities, the serious and hypothetical accidents are decided to be evaluated in accordance with the guideline for reactor location investigation. (Wakatsuki, Y.)

  19. The Evaluation of the Safety Benefits of Combined Passive and On-Board Active Safety Applications

    Science.gov (United States)

    Page, Yves; Cuny, Sophie; Zangmeister, Tobias; Kreiss, Jens-Peter; Hermitte, Thierry

    2009-01-01

    One of the objectives of the European TRACE project (TRaffic Accident Causation in Europe, 2006–2008) was to estimate the proportion of injury accidents that could be avoided and/or the proportion of injury accidents where the severity could be mitigated for on-the-market safety applications, if 100 % of the car fleet would be equipped with them. We have selected for evaluation the Electronic Stability Control (ESC) and the Emergency Brake Assist (EBA) applications. As for passive safety systems, recent cars are designed to offer overall safety protection. Car structure, load limiters, front airbags, side airbags, knee airbags, pretensioners, padding and non aggressive structures in the door panel, the dashboard, the windshield, the seats, and the head rest also contribute to applying more protection. The whole safety package is very difficult to evaluate separately, one element independently segmented from the others. We decided to consider evaluating the effectivenessof the whole passive safety package, This package,, for the sake of simplicity, was the number of stars awarded at the Euro NCAP testing. The challenges were to compare the effectiveness of some safety configuration SC I, with the effectiveness of a different safety configuration SC II. A safety configuration is understood as a package of safety functions. Ten comparisons have been carried out such as the evaluation of the safety benefit of a fifth star given that the car has four stars and an EBA. The main outcome of this analysis is that any addition of a passive or active safety function selected in this analysis is producing increased safety benefits. For example, if all cars were five stars fitted with EBA and ESC, instead of four stars without ESC and EBA, injury accidents would be reduced by 47.2% for severe injuries and 69.5% for fatal injuries. PMID:20184838

  20. A paradigm shift in organisational safety culture evaluation and training

    OpenAIRE

    Cram, Robert; Sime, Julie-Ann

    2015-01-01

    The focus of this research is to explore the issues surrounding traditional approaches towards understanding the safety culture of an organisation operating in a high risk environment and to identify an effective technique to educate corporate management in how to measure and evaluate the underlying safety culture of their own organisations. The results of the first part of the research highlight the concerns being expressed by both academic and industrial communities that current safety cult...

  1. Probabilistic performance assessments for evaluations of the Yucca Mountain site

    International Nuclear Information System (INIS)

    Rickertsen, L.D.; Noronha, C.J.

    1992-01-01

    Site suitability evaluations are conducted to determine if a repository system at a particular site will be able to meet the performance objectives for that system. Early evaluations to determine if the Yucca Mountain site is suitable for repository development have been made in the face of large uncertainties in site features and conditions. Because of these large uncertainties, the evaluations of the site have been qualitative in nature, focusing on the presence or absence of particular features or conditions thought to be important to performance, rather than on results of quantitative performance assessments. Such a qualitative approach was used in the recently completed evaluation of the Yucca Mountain site, the Early Site-Suitability Evaluation (ESSE). In spite of the qualitative approach, the ESSE was able to conclude that no disqualifying conditions are likely to be present at the site and that all of the geologic conditions that would qualify the site are likely to be met. At the same time, because of the qualitative nature of the approach used in the ESSE, the precise importance of the identified issues relative to performance could not be determined. Likewise, the importance of the issues relative to one another could not be evaluated, and, other than broad recommendations, specific priorities for future testing could not be set. The authors have conducted quantitative performance assessments for the Yucca Mountain site to address these issues

  2. Phytoremediation options for radioactively contaminated sites evaluated

    International Nuclear Information System (INIS)

    Vandenhove, Hildegarde

    2013-01-01

    Highlights: ► We present an overview of the most important site and environmental radioactive contamination problems encountered. ► The potential role of different phytomanagement options is discussed and illustrated with examples. ► The phytomanagement options considered are: soil phytoextraction, rhizofiltration, wetlands and alternative land use. - Abstract: The application of nuclear energy and the use of radionuclides for industrial, medical and research purposes have caused significant contamination of certain sites and their environment, which could result in health problems for several centuries if nothing is undertaken to remedy these situations. Except for the immediate environment of the facility, where decontamination activities may be feasible and affordable, the contamination often extents over a vast area and decontamination would be costly and could result in vast amounts of waste. Therefore, more realistic yet efficient remediation options should be searched for of which phytomanagement is among the potential options. A number of phytomanagement approaches will be discussed

  3. Evaluating Sediment Mobility for Siting Nearshore Berms

    Science.gov (United States)

    2016-04-01

    placement of dredged sediment that may contain more fine silts and clays than are allowed for placement directly on the beach. The United States Army...used in the density and viscosity calculations. For this technical note an example study site is selected and the sediment mobility indexes are...acceleration due to gravity, sρ is the sediment density, ρ is the water density, v is the kinematic viscosity of water, crθ is the Shields

  4. Safety management system during rock blasting at FRFCF construction site

    International Nuclear Information System (INIS)

    Vijayakumaran, C.; Kandasamy, S.; Satpathy, K.K.

    2016-01-01

    Blasting is an important activity during rock excavation to reach required depth for obtaining stability of the civil structure. For the construction of various Plant Buildings of Fast Reactor Fuel Cycle Facility (FRFCF), IGCAR at Kalpakkam, based on the geological survey it is required to reach a depth of 21.4 meters from existing ground level. This paper details about the procedures and precaution adopted during the rock blasting activities at FRFCF site. The volume of rock removed by blasting was 3 lakh cubic meters. The total number of blasting carried out was 304 using 105.73 tons of blasting material. The entire blasting work could be completed within 174 days without any incident. (author)

  5. Criticality Safety Evaluation of Hanford Tank Farms Facility

    Energy Technology Data Exchange (ETDEWEB)

    WEISS, E.V.

    2000-12-15

    Data and calculations from previous criticality safety evaluations and analyses were used to evaluate criticality safety for the entire Tank Farms facility to support the continued waste storage mission. This criticality safety evaluation concludes that a criticality accident at the Tank Farms facility is an incredible event due to the existing form (chemistry) and distribution (neutron absorbers) of tank waste. Limits and controls for receipt of waste from other facilities and maintenance of tank waste condition are set forth to maintain the margin subcriticality in tank waste.

  6. Criticality Safety Evaluation of Hanford Tank Farms Facility

    International Nuclear Information System (INIS)

    WEISS, E.V.

    2000-01-01

    Data and calculations from previous criticality safety evaluations and analyses were used to evaluate criticality safety for the entire Tank Farms facility to support the continued waste storage mission. This criticality safety evaluation concludes that a criticality accident at the Tank Farms facility is an incredible event due to the existing form (chemistry) and distribution (neutron absorbers) of tank waste. Limits and controls for receipt of waste from other facilities and maintenance of tank waste condition are set forth to maintain the margin subcriticality in tank waste

  7. A reliability evaluation method for NPP safety DCS application software

    International Nuclear Information System (INIS)

    Li Yunjian; Zhang Lei; Liu Yuan

    2014-01-01

    In the field of nuclear power plant (NPP) digital i and c application, reliability evaluation for safety DCS application software is a key obstacle to be removed. In order to quantitatively evaluate reliability of NPP safety DCS application software, this paper propose a reliability evaluating method based on software development life cycle every stage's v and v defects density characteristics, by which the operating reliability level of the software can be predicted before its delivery, and helps to improve the reliability of NPP safety important software. (authors)

  8. Evaluation of breastfeeding Web sites for patient education.

    Science.gov (United States)

    Dornan, Barbara A; Oermann, Marilyn H

    2006-01-01

    To evaluate the quality of Web sites on breastfeeding for patient education. Descriptive study of 30 Web sites on breastfeeding for patient education, evaluated based on the Health Information Technology Institute (HITI) criteria, readability, and eight content criteria from the American Academy of Pediatrics (AAP) policy statement on breastfeeding. The mean Flesch-Kincaid Grade Level for readability of the 30 sites was 9.2. Seven of the sites included all eight of the content criteria from the AAP, and three sites did not include any of the information recommended by the AAP content criteria. Nurses should be able to recommend best patient education materials for their patients. The five best Web sites for breastfeeding education are identified for patient teaching, and the HITI criteria are explained for nurses to learn how to evaluate Web sites for themselves and their patients.

  9. Research on the Evaluation System for Rural Public Safety Planning

    Institute of Scientific and Technical Information of China (English)

    Ming; SUN; Jianxin; YAN

    2014-01-01

    The indicator evaluation system is introduced to the study of rural public safety planning in this article.By researching the current rural public safety planning and environmental carrying capacity,we select some carrying capacity indicators influencing the rural public safety,such as land,population,ecological environment,water resources,infrastructure,economy and society,to establish the environmental carrying capacity indicator system.We standardize the indicators,use gray correlation analysis method to determine the weight of indicators,and make DEA evaluation of the indicator system,to obtain the evaluation results as the basis for decision making in rural safety planning,and provide scientific and quantified technical support for rural public safety planning.

  10. Occupational health and safety in the Moroccan construction sites: preliminary diagnosis

    Science.gov (United States)

    Tarik, Bakeli; Adil, Hafidi Alaoui

    2018-05-01

    Managing occupational health and safety on Moroccan construction sector represents the first step for projects' success. In fact, by avoiding accidents, all the related direct and indirect costs and delays can be prevented. That leads to an important question always asked by any project manager: what are the factors responsible for accidents? How can they be avoided? Through this research, the aim is to go through these questions, to contribute in occupational health and safety principles understanding, to identify construction accidentology and risk management opportunities and to approach the case of Moroccan construction sites by an accurate diagnosis. The approach is to make researchers, managers, stakeholders and deciders aware about the criticality of construction sites health and safety situation. And, to do the first step for a scientific research project in relation with health and safety in the Moroccan construction sector. For this, the paper will study the related state of art namely about construction sites accidents causation, and will focus on Reason's `Swiss cheese' model and its utilization for Moroccan construction sites health and safety diagnosis. The research will end with an estimation of an accidents fatality rate in the Moroccan construction sector and a benchmarking with the international rates. Finally, conclusions will be presented about the necessity of Occupational Health and Safety Management System (OHSMS) implementation, which shall cover all risk levels, and insure, at the same time, that the necessary defenses against accidents are on place.

  11. Evaluation of a committed fusion site. Final report

    International Nuclear Information System (INIS)

    1979-07-01

    This report is divided into five technical sections. Section 2 is a summary. In Section 3, which covers device and site analyses the major characteristics of devices that might be placed at the site, as envisioned by major fusion laboratories, are described; the characteristics of a site (baseline site) which would accommodate these devices are defined; and various approaches to a committed site meeting the baseline site requirements are discussed. Section 4 describes the scenarios selected to represent possible site development outcomes; these scenarios are evaluated with respect to comparative cost and schedule effects. Section 5 presents a brief evaluation of the effects fusion-fission hybrids might have on the committed site. Major conclusions and recommendations are discussed in Section 6

  12. American National Standard: guidelines for evaluating site-related geotechnical parameters at nuclear power sites

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    This standard presents guidelines for evaluating site-related geotechnical parameters for nuclear power sites. Aspects considered include geology, ground water, foundation engineering, and earthwork engineering. These guidelines identify the basic geotechnical parameters to be considered in site evaluation, and in the design, construction, and performance of foundations and earthwork aspects for nuclear power plants. Also included are tabulations of typical field and laboratory investigative methods useful in identifying geotechnical parameters. Those areas where interrelationships with other standards may exist are indicated

  13. The occupational safety on the construction sites of the farm production buildings in Finland

    Directory of Open Access Journals (Sweden)

    M. Hellstedt

    2013-09-01

    Full Text Available The size of farms has increased considerably during Finland's EU membership. The growth has meant big investments in the new production buildings. The buildings have been switched to big industrialhall- like constructions from small-scale ones which have contained own timber and own work contribution. The objective of the project financed by Farmers' Social Insurance Institution was to improve occupational safety on farm building construction and renovation sites by disseminating current safety practices and by developing ways of action which are better than the prevailing ones. The project consisted of a literature review, statistical analysis, as well as a farmer and designer interviews. In the statistical analysis the MATA occupational injuries insurance claims database on farmers’ claims during construction and renovation work for the years 2005 - 2008 was compared with the register of Federation of Accident Insurance Institutions on the construction workers' injuries. In comparing the reasons of the accidents a clear difference was found; poor scaffoldings and ladders are still the main culprits on farm accidents. Farmer interviews were used to assess occupational safety measures on the construction site, occurred injuries and their types, nearmiss situations and the underlying factors which have led to the injuries. Also construction safety deficiencies as well as the direct and indirect costs caused for instance because of the delay in completion of construction project were discussed. Designer interviews aimed to find out how occupational safety and health considerations are taken into account in farm building planning and counseling, and how this experience of the designers should be utilized in order to improve safety at the construction sites on farms. Farmers knew their obligations on occupational safety poorly. The situation was further worsened by the fact that on the site the supervisor tasks were only nominally executed. The

  14. Evaluation of the patient safety Leadership Walkabout programme of a hospital in Singapore.

    Science.gov (United States)

    Lim, Raymond Boon Tar; Ng, Benjamin Boon Lui; Ng, Kok Mun

    2014-02-01

    The Patient Safety Leadership Walkabout (PSLWA) programme is a commonly employed tool in the West, in which senior leaders visit sites within the hospital that are involved in patient care to talk to healthcare staff about patient safety issues. As there is a lack of perspective regarding PSLWA in Asia, we carried out an evaluation of its effectiveness in improving the patient safety culture in Tan Tock Seng Hospital, Singapore. A mixed methods analysis approach was used to review and evaluate all documents, protocols, meeting minutes, post-walkabout surveys, action plans and verbal feedback pertaining to the walkabouts conducted from January 2005 to October 2012. A total of 321 patient safety issues were identified during the study period. Of these, 308 (96.0%) issues were resolved as of November 2012. Among the various categories of issues raised, issues related to work environment were the most common (45.2%). Of all the issues raised during the walkabouts, 72.9% were not identified through other conventional methods of error detection. With respect to the hospital's patient safety culture, 94.8% of the participants reported an increased awareness in patient safety and 90.2% expressed comfort in openly and honestly discussing patient safety issues. PSLWA serves as a good tool to uncover latent errors before actual harm reaches the patient. If properly implemented, it is an effective method for engaging leadership, identifying patient safety issues, and supporting a culture of patient safety in the hospital setting.

  15. Geological-Hydrological Site Evaluation for NPP Planning

    Energy Technology Data Exchange (ETDEWEB)

    Faust, Brigitte; Mini, Paolo [Nordostsschweizerische Kraftwerke AG NOK, Parkstrasse 23, 5401 Baden (Switzerland)

    2008-07-01

    NOK is investigating the potential replacement of the current NPP in Beznau. In order to meet the requirements with respect to a general licence application, geological, seismological, and geotechnical engineering, but also hydrological boundary conditions have been defined. These conditions define the nature of necessary investigations to obtain the geological, seismic, geotechnical and hydrological data themselves forming the basis to determine the site suitability. Viability has to be provided that a NPP can be built and operated at the proposed site without compromising public health, safety and environment. The collected data are also the basis for the design of all safety relevant structures, systems, and components. For example, the latter have to withstand the effects of natural phenomena such as earthquakes and human induced impact such as airplane crash without loosing their capability to perform the assigned safety functions. (authors)

  16. Geological-Hydrological Site Evaluation for NPP Planning

    International Nuclear Information System (INIS)

    Faust, Brigitte; Mini, Paolo

    2008-01-01

    NOK is investigating the potential replacement of the current NPP in Beznau. In order to meet the requirements with respect to a general licence application, geological, seismological, and geotechnical engineering, but also hydrological boundary conditions have been defined. These conditions define the nature of necessary investigations to obtain the geological, seismic, geotechnical and hydrological data themselves forming the basis to determine the site suitability. Viability has to be provided that a NPP can be built and operated at the proposed site without compromising public health, safety and environment. The collected data are also the basis for the design of all safety relevant structures, systems, and components. For example, the latter have to withstand the effects of natural phenomena such as earthquakes and human induced impact such as airplane crash without loosing their capability to perform the assigned safety functions. (authors)

  17. Evaluation of safety practices and performance in a brewery industry ...

    African Journals Online (AJOL)

    Evaluation of safety practices and performance in a brewery industry in Nigeria between 2000 – 2007. ... Journal of Applied Sciences and Environmental Management ... The study revealed that a total of 156 accidents were prevented in the period of the safety programme which translates to an average of 19.45 per year.

  18. Second Meeting for Evaluation of the Nuclear Safety Convention

    International Nuclear Information System (INIS)

    2002-01-01

    This report presents the results of the Second Meeting for Evaluation of the Nuclear Safety Convention. the CSN. as the only competent Government organism on nuclear safety, represented Spain in the preparation of the national report and at the Review Meeting, acquiring a set of obligations for the next three years, until the holding of third meeting. (Author)

  19. Contribution of maintainability and maintenance to problems of safety evaluation

    International Nuclear Information System (INIS)

    Adnot, Serge; Meriaux, Pierre.

    1977-10-01

    A method has been developed for defining the contribution of Maintainability and the Maintenance Studies to Safety evaluation problems. The efficiency of this method is shown and results obtained are given for two theoretical examples approximating reality. For repairable systems, the risk defined according to such given safety criterion, becomes a characteristic of the systems in operation [fr

  20. Structural evaluation of safety class components to natural phenomena loadings

    International Nuclear Information System (INIS)

    Conrads, T.J.

    1989-01-01

    This paper addresses the efforts completed at the US Department of Energy Hanford Site near Richland, Washington, to qualify structurally a number of existing safety class components in the Plutonium Finishing Plant complex. Design, fabrication, and installation of the facility occurred in the 1950s and 1960s and were based on the Uniform Building Code criteria for wind and earthquake loads. Recently the buildings were qualified to site-specific wind and seismic hazards. The methodology employed to qualify seismically the safety class components is discussed

  1. Critical evaluation of nuclear safety reports Pt. 1

    International Nuclear Information System (INIS)

    Egely, Gy.

    1987-01-01

    Licensing procedures of siting, commissioning and operation of nuclear power plants in the USA, FRG, France and Japan are compared. The standard format and content of nuclear safety analysis reports including the general description of the plant, the presentation of the characteristics of siting, building structures, components, facilities, the reactors, the cooling system, the safety system, the measuring and control system, the power supply system, the auxilliary system, the energy transformation system, etc. are discussed in detail by the example of the US procedure. (V.N.)

  2. Digital Discernment: An E-Commerce Web Site Evaluation Tool

    Science.gov (United States)

    Sigman, Betsy Page; Boston, Brian J.

    2013-01-01

    Students entering the business workforce today may well share some responsibility for developing, revising, or evaluating their company's Web site. They may lack the experience, however, to critique their employer's Web presence effectively. The purpose of developing Digital Discernment, an e-commerce Web site evaluation tool, was to prepare…

  3. Coordinated site characterization and performance assessment - an iterative approach for the site evaluation

    International Nuclear Information System (INIS)

    Papp, T.; Ericsson, L.O.; Thegerstroem, C.; Almen, K.E.

    1995-01-01

    SKB planning for siting a deep repository involves feasibility studies in 5-10 municipalities surface based characterization and drilling on two candidate sites and detailed characterization of one site including a shaft to proposed repository depth. The selection of a site or the detailed layout of the repository defines characteristics that might influence safety in a broad sense. There is a strong ling between the safety, technical (engineering) and functional aspects. The site selection will be based on general geoscientific information, i.e. mechanical stability, ground-water chemistry, slow ground-water movements and complicating factors like high potential for mineralization. The general layout of the repository in the actual geological structure of the site must be done with regard to a number of guidelines, e.g. to hydraulically separate the parts of the repository containing the spent nuclear fuel from those for other types of long lived waste and to separate the two stages of the spent fuel repository so they can be handled separately in the licensing process. When the various parts of the repository have been tentatively located the consequence of the multiple barrier principle is that the layout of the various parts should be made with the aim to utilize the available natural barrier system at the site as well as possible. (authors). 2 refs., 3 figs., 2 tabs

  4. Monitored retrievable storage facility site screening and evaluation report

    International Nuclear Information System (INIS)

    1985-05-01

    The Nuclear Waste Policy Act of 1982 directs the Department of Energy to ''complete a detailed study of the need for and feasibility of, and to submit to the Congress a proposal for, the construction of one or more monitored retrievable storage facilities for high level radioactive waste and spent nuclear fuel.'' The Act directs that the proposal includes site specific designs. Further, the proposal is to include, ''for the first such facility, at least three alternative sites and at least five alternative combinations of such proposed site and facility designs...'' as well as a recommendation of ''the combination among the alternatives that the Secretary deems preferable.'' An MRS Site Screening Task Force has been formed to help identify and evaluated potential MRS facility sites within a preferred region and with the application of a siting process and criteria developed by the DOE. The activities of the task force presented in this report includes: site screening (Sections 3, 4, and 5), the MRS facilities which are to be sited are described; the criteria, process and outcome of the screening process is presented; and descriptions of the candidate MRS facility sites are given, and site evaluations (Sections 6 through 9) where the rational for the site evaluations are presented, along with each evaluation and findings of the Task Force

  5. Monitored retrievable storage facility site screening and evaluation report

    Energy Technology Data Exchange (ETDEWEB)

    none,

    1985-05-01

    The Nuclear Waste Policy Act of 1982 directs the Department of Energy to complete a detailed study of the need for and feasibility of, and to submit to the Congress a proposal for, the construction of one or more monitored retrievable storage facilities for high level radioactive waste and spent nuclear fuel.'' The Act directs that the proposal includes site specific designs. Further, the proposal is to include, for the first such facility, at least three alternative sites and at least five alternative combinations of such proposed site and facility designs...'' as well as a recommendation of the combination among the alternatives that the Secretary deems preferable.'' An MRS Site Screening Task Force has been formed to help identify and evaluated potential MRS facility sites within a preferred region and with the application of a siting process and criteria developed by the DOE. The activities of the task force presented in this report includes: site screening (Sections 3, 4, and 5), the MRS facilities which are to be sited are described; the criteria, process and outcome of the screening process is presented; and descriptions of the candidate MRS facility sites are given, and site evaluations (Sections 6 through 9) where the rational for the site evaluations are presented, along with each evaluation and findings of the Task Force.

  6. Uncertainty analysis for Ulysses safety evaluation report

    International Nuclear Information System (INIS)

    Frank, M.V.

    1991-01-01

    As part of the effort to review the Ulysses Final Safety Analysis Report and to understand the risk of plutonium release from the Ulysses spacecraft General Purpose Heat Source---Radioisotope Thermal Generator (GPHS-RTG), the Interagency Nuclear Safety Review Panel (INSRP) and the author performed an integrated, quantitative analysis of the uncertainties of the calculated risk of plutonium release from Ulysses. Using state-of-art probabilistic risk assessment technology, the uncertainty analysis accounted for both variability and uncertainty of the key parameters of the risk analysis. The results show that INSRP had high confidence that risk of fatal cancers from potential plutonium release associated with calculated launch and deployment accident scenarios is low

  7. Radioactive safety analysis and assessment of waste rock pile site in uranium tailings

    International Nuclear Information System (INIS)

    Liu Changrong; Liu Zehua; Wang Zhiyong; Zhou Xinghuo

    2007-01-01

    Based on theoretical calculation and in-situ test results, distribution and emissions of radioactive nuclides of uranium tailings impoundment and waste rock pile sites are analyzed in this paper. It is pointed out that 222 Rn is the main nuclide of uranium tailings impoundment and waste rock pile site. Also 222 Rn is the main source term of public dose. 222 Rn concentrations in the atmospheric environment around and individual dose to Rn gradually decrease with increasing distances to uranium tailings impoundment and waste rock pile site. Based on in-situ tests on five uranium tailings impoundment and waste rock pile sites, a decisive method and safety protection distance are presented, which can be used to guide the validation and design of radioactive safety protection in uranium tailings impoundment and waste rock pile sites. (authors)

  8. Biosphere analyses for the safety assessment SR-Site - synthesis and summary of results

    Energy Technology Data Exchange (ETDEWEB)

    Saetre, Peter [comp.

    2010-12-15

    This report summarises nearly 20 biosphere reports and gives a synthesis of the work performed within the SR-Site Biosphere project, i.e. the biosphere part of SR-Site. SR-Site Biosphere provides the main project with dose conversion factors (LDFs), given a unit release rate, for calculation of human doses under different release scenarios, and assesses if a potential release from the repository would have detrimental effects on the environment. The intention of this report is to give sufficient details for an overview of methods, results and major conclusions, with references to the biosphere reports where methods, data and results are presented and discussed in detail. The philosophy of the biosphere assessment was to make estimations of the radiological risk for humans and the environment as realistic as possible, based on the knowledge of present-day conditions at Forsmark and the past and expected future development of the site. This was achieved by using the best available knowledge, understanding and data from extensive site investigations from two sites. When sufficient information was not available, uncertainties were handled cautiously. A systematic identification and evaluation of features and processes that affect transport and accumulation of radionuclides at the site was conducted, and the results were summarised in an interaction matrix. Data and understanding from the site investigation was an integral part of this work, the interaction matrix underpinned the development of the radionuclide model used in the biosphere assessment. Understanding of the marine, lake and river and terrestrial ecosystems at the site was summarized in a conceptual model, and relevant features and process have been characterized to capture site specific parameter values. Detailed investigations of the structure and history of the regolith at the site and simulations of regolith dynamics were used to describe the present day state at Forsmark and the expected development of

  9. Risk management study for the retired Hanford Site facilities: Qualitative risk evaluation for the retired Hanford Site facilities

    International Nuclear Information System (INIS)

    Coles, G.A.; Shultz, M.V.; Taylor, W.E.

    1993-09-01

    This document provides a risk evaluation of the 100 and 200 Area retired, surplus facilities on the Hanford Site. Also included are the related data that were compiled by the risk evaluation team during investigations performed on the facilities. Results are the product of a major effort performed in fiscal year 1993 to produce qualitative information that characterizes certain risks associated with these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1,450-km 2 (570-mi 2 ) Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30-km (20 mi) southeast of the 200 Area. During walkdown investigations of these facilities, data on real and potential hazards that threatened human health or safety or created potential environmental release issues were identified by the risk evaluation team. Using these findings, the team categorized the identified hazards by facility and evaluated the risk associated with each hazard. The factors contributing to each risk, and the consequence and likelihood of harm associated with each hazard also are included in this evaluation

  10. Risk management study for the retired Hanford Site facilities: Qualitative risk evaluation for the retired Hanford Site facilities. Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    Coles, G.A.; Shultz, M.V.; Taylor, W.E.

    1993-09-01

    This document provides a risk evaluation of the 100 and 200 Area retired, surplus facilities on the Hanford Site. Also included are the related data that were compiled by the risk evaluation team during investigations performed on the facilities. Results are the product of a major effort performed in fiscal year 1993 to produce qualitative information that characterizes certain risks associated with these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1,450-km{sup 2} (570-mi{sup 2}) Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30-km (20 mi) southeast of the 200 Area. During walkdown investigations of these facilities, data on real and potential hazards that threatened human health or safety or created potential environmental release issues were identified by the risk evaluation team. Using these findings, the team categorized the identified hazards by facility and evaluated the risk associated with each hazard. The factors contributing to each risk, and the consequence and likelihood of harm associated with each hazard also are included in this evaluation.

  11. Evaluation of reliability assurance approaches to operational nuclear safety

    International Nuclear Information System (INIS)

    Mueller, C.J.; Bezella, W.A.

    1984-01-01

    This report discusses the results of research to evaluate existing and/or recommended safety/reliability assurance activities among nuclear and other high technology industries for potential nuclear industry implementation. Since the Three Mile Island (TMI) accident, there has been increased interest in the use of reliability programs (RP) to assure the performance of nuclear safety systems throughout the plant's lifetime. Recently, several Nuclear Regulatory Commission (NRC) task forces or safety issue review groups have recommended RPs for assuring the continuing safety of nuclear reactor plants. 18 references

  12. Safety assessment of multi-unit NPP sites subject to external events

    International Nuclear Information System (INIS)

    Samaddar, Sujit; Hibino, Kenta; Coman, Ovidiu

    2014-01-01

    This paper presents a framework for conducting a probabilistic safety assessment of multi-unit sites against external events. The treatment of multiple hazard on a unit, interaction between units, implementation of severe accident measures, human reliability, environmental conditions, metric of risk for both reactor and non-reactor sources, integration of risk and responses and many such important factors need to be addressed within the context of this framework. The framework facilitates the establishment of a comprehensive methodology that can be applied internationally to the peer review of safety assessment of multi-unit sites under the impact of multiple external hazards. In summary, it can be said that the site safety assessment for a multi-unit site will be quite complex and need to start with individual unit risk assessments, these need to be combined considering the interactions between units and their responses, and the fragilities of the installations established considering the combined demands from all interactions. Using newly established risk metric the risk can then be integrated for the overall site. Fig. 2 shows schematically such a proposal. Much work has to done and the IAEA has established a working group that is systematically establishing the structure and process to incorporate the many issues that are a part of a multi-unit site safety assessment. (authors)

  13. Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

    Energy Technology Data Exchange (ETDEWEB)

    Maheras, Steven J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Best, Ralph E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ross, Steven B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Buxton, Kenneth A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); England, Jeffery L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); McConnell, Paul E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Massaro, Lawrence M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Jensen, Philip J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-09-30

    A preliminary evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power reactor sites was conducted. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure and conditions relevant to transportation of SNF and GTCC waste, (3) an evaluation of the near-site transportation infrastructure and experience relevant to shipping transportation casks containing SNF and GTCC waste, including identification of gaps in information, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. Every site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. It is expected that additional site visits will be conducted to add to the information presented in the evaluation.

  14. General safety guidelines for looking for a low mass activity-long life waste storage site

    International Nuclear Information System (INIS)

    2008-01-01

    The objective of this document is to define general guidelines which must be followed during the stages of search for a site and stages of design of a storage facility for low activity-long life radioactive wastes, in order to ensure its safety after closure. After having specified the considered wastes, geological shapes, and situations, this document defines the fundamental objective and the associated criteria (protection against chemical risk, radioprotection). It presents the design aspects related to safety (safety principles and functions, waste packages, public works engineering, geological environment, storage concepts). The last part deals with the safety demonstration after site closure which includes the control of some components, the assessment of disturbances in the storage facility or due to its presence, the taking of uncertainty and sensitivity studies into account, the influence of natural events

  15. Oak Ridge National Laboratory site data for safety-analysis report

    International Nuclear Information System (INIS)

    Fitzpatrick, F.C.

    1982-12-01

    The Oak Ridge National Laboratory site data contained herein were compiled in support of the United States Department of Energy (USDOE) Oak Ridge Operations Office Order OR 5481.1. That order sets forth assignment of responsibilities for safety analysis and review responsibilities and provides guidance relative to the content and format of safety analysis reports. The information presented in this document is intended for use by reference in individual safety analysis reports where applicable to support accident analyses or the establishment of design bases of significance to safety, and it is applicable only to Oak Ridge National Laboratory facilities in Bethel and Melton Valleys. This information includes broad descriptions of the site characteristics, radioactive waste handling and monitoring practices, and the organization and operating policies at Oak Ridge National Laboratory. The historical background of the Laboratory is discussed briefly and the overall physical situation of the facilities is described in the following paragraphs

  16. Oak Ridge National Laboratory site data for safety-analysis report

    Energy Technology Data Exchange (ETDEWEB)

    Fitzpatrick, F.C.

    1982-12-01

    The Oak Ridge National Laboratory site data contained herein were compiled in support of the United States Department of Energy (USDOE) Oak Ridge Operations Office Order OR 5481.1. That order sets forth assignment of responsibilities for safety analysis and review responsibilities and provides guidance relative to the content and format of safety analysis reports. The information presented in this document is intended for use by reference in individual safety analysis reports where applicable to support accident analyses or the establishment of design bases of significance to safety, and it is applicable only to Oak Ridge National Laboratory facilities in Bethel and Melton Valleys. This information includes broad descriptions of the site characteristics, radioactive waste handling and monitoring practices, and the organization and operating policies at Oak Ridge National Laboratory. The historical background of the Laboratory is discussed briefly and the overall physical situation of the facilities is described in the following paragraphs.

  17. An evaluation of the uranium mine radiation safety course

    International Nuclear Information System (INIS)

    1984-07-01

    The report evaluates the Uranium Mine Radiation Safety Course focussing on the following areas: effectivenss of the course; course content; instructional quality; course administration. It notes strengths and weaknesses in these areas and offers preliminary recommendations for future action

  18. CRITICALITY SAFETY LIMIT EVALUATION PROGRAM (CSLEP's) AND QUICK SCREENS: ANSWERS TO EXPEDITED PROCESSING LEGACY CRITICALITY SAFETY LIMITS AND EVALUATIONS

    International Nuclear Information System (INIS)

    TOFFER, H.

    2006-01-01

    Since the end of the cold war, the need for operating weapons production facilities has faded. Criticality Safety Limits and controls supporting production modes in these facilities became outdated and furthermore lacked the procedure based rigor dictated by present day requirements. In the past, in many instances, the formalism of present day criticality safety evaluations was not applied. Some of the safety evaluations amounted to a paragraph in a notebook with no safety basis and questionable arguments with respect to double contingency criteria. When material stabilization, clean out, and deactivation activities commenced, large numbers of these older criticality safety evaluations were uncovered with limits and controls backed up by tenuous arguments. A dilemma developed: on the one hand, cleanup activities were placed on very aggressive schedules; on the other hand, a highly structured approach to limits development was required and applied to the cleanup operations. Some creative approaches were needed to cope with the limits development process

  19. Nuclear criticality safety parameter evaluation for uranium metallic alloy

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez, Andrea; Abe, Alfredo, E-mail: andreasdpz@hotmail.com, E-mail: abye@uol.com.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil). Centro de Energia Nuclear

    2013-07-01

    Nuclear criticality safety during fuel fabrication process, transport and storage of fissile and fissionable materials requires criticality safety analysis. Normally the analysis involves computer calculations and safety parameters determination. There are many different Criticality Safety Handbooks where such safety parameters for several different fissile mixtures are presented. The handbooks have been published to provide data and safety principles for the design, safety evaluation and licensing of operations, transport and storage of fissile and fissionable materials. The data often comprise not only critical values, but also subcritical limits and safe parameters obtained for specific conditions using criticality safety calculation codes such as SCALE system. Although many data are available for different fissile and fissionable materials, compounds, mixtures, different enrichment level, there are a lack of information regarding a uranium metal alloy, specifically UMo and UNbZr. Nowadays uranium metal alloy as fuel have been investigated under RERTR program as possible candidate to became a new fuel for research reactor due to high density. This work aim to evaluate a set of criticality safety parameters for uranium metal alloy using SCALE system and MCNP Monte Carlo code. (author)

  20. End of mission report on seismic safety review mission for Belene NPP site

    International Nuclear Information System (INIS)

    Gurpinar, A.; Mohammadioun, B.; Schneider, H.; Serva, L.

    1995-01-01

    Upon the invitation of the Bulgarian government through the Committee for the Peaceful Uses of Atomic Energy and within the framework of the implementation of the Technical Cooperation project BUL/9/012 related to site and seismic of NPPs, a mission visited Sofia 3 - 7 July 1995. The mission constituted a follow-up of the interim review of subjects related to tectonic stability and seismic hazard characterization of the site which was performed in September 1993. The main objective of the mission was the final review of the subjects already reviewed in September 1993 as well as issues related to geotechnical engineering and foundation safety. The main terms of reference of the present mission was to verify the implementation of the recommendations of the Site Safety Review Mission of June 1990. This document gives findings on geology-tectonics, seismology and foundation safety. In the end conclusions and recommendations of the mission are presented

  1. A tool for safety evaluations of road improvements.

    Science.gov (United States)

    Peltola, Harri; Rajamäki, Riikka; Luoma, Juha

    2013-11-01

    Road safety impact assessments are requested in general, and the directive on road infrastructure safety management makes them compulsory for Member States of the European Union. However, there is no widely used, science-based safety evaluation tool available. We demonstrate a safety evaluation tool called TARVA. It uses EB safety predictions as the basis for selecting locations for implementing road-safety improvements and provides estimates of safety benefits of selected improvements. Comparing different road accident prediction methods, we demonstrate that the most accurate estimates are produced by EB models, followed by simple accident prediction models, the same average number of accidents for every entity and accident record only. Consequently, advanced model-based estimates should be used. Furthermore, we demonstrate regional comparisons that benefit substantially from such tools. Comparisons between districts have revealed significant differences. However, comparisons like these produce useful improvement ideas only after taking into account the differences in road characteristics between areas. Estimates on crash modification factors can be transferred from other countries but their benefit is greatly limited if the number of target accidents is not properly predicted. Our experience suggests that making predictions and evaluations using the same principle and tools will remarkably improve the quality and comparability of safety estimations. Copyright © 2013 Elsevier Ltd. All rights reserved.

  2. Site specific health and safety plan for drilling in support of in situ redox manipulation

    International Nuclear Information System (INIS)

    Tuttle, B.G.

    1997-02-01

    This document contains the Site Specific Health and Safety Plan for Drilling in support of the In Situ REDOX Manipulation in the 100-HR-3 Operable Unit. Approximately eight wells will be drilled in the 100-D/DR Area using rotary, sonic, or cable tool drilling methods. Split-spoon sampling will be done in conjunction with the drilling. The drilling may be spread out over several months. Included in this document are checklists for health and safety procedures

  3. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  4. Packaging Evaluation Approach to Improve Cosmetic Product Safety

    OpenAIRE

    Benedetta Briasco; Priscilla Capra; Arianna Cecilia Cozzi; Barbara Mannucci; Paola Perugini

    2016-01-01

    In the Regulation 1223/2009, evaluation of packaging has become mandatory to assure cosmetic product safety. In fact, the safety assessment of a cosmetic product can be successfully carried out only if the hazard deriving from the use of the designed packaging for the specific product is correctly evaluated. Despite the law requirement, there is too little information about the chemical-physical characteristics of finished packaging and the possible interactions between formulation and packag...

  5. Identification of scenarios in the safety assessment of a deep geological site for radioactive waste disposal

    International Nuclear Information System (INIS)

    Escalier des Orres, P.; Devillers, C.; Cernes, A.

    1990-01-01

    The selection and qualification procedure of a site for radioactive wastes disposal in a deep geologic formation, has begun in France in the early eighties. The public authorities, on ANDRA's proposal, has preselected in 1987 four sites, each of them corresponding to a type of geologic formations (granite, clay, salt and shale). Within two years, one of these sites will be chosen for the location of an underground laboratory. The safety analysis for the site's qualification uses evolution scenarios of the repository and its environment, chosen according to a deterministic method. With an appropriate detail level, are defined a reference scenario and scenario with random events. 4 refs., 1 tab [fr

  6. Overheads, Safety Analysis and Engineering FY 1995 Site Support Program Plan WBS 6.3.5

    Energy Technology Data Exchange (ETDEWEB)

    DiVincenzo, E.P.

    1994-09-27

    The Safety Analysis & Engineering (SA&E) department provides core competency for safety analysis and risk documentation that supports achievement of the goals and mission as described in the Hanford Mission Plan, Volume I, Site Guidance (DOE-RL 1993). SA&E operations are integrated into the programs that plan and conduct safe waste management, environmental restoration, and operational activities. SA&E personnel are key members of task teams assigned to eliminate urgent risks and inherent threats that exist at the Hanford Site. Key to ensuring protection of public health and safety, and that of onsite workers, are the products and services provided by the department. SA&E will continue to provide a leadership role throughout the DOE complex with innovative, cost-effective approaches to ensuring safety during environmental cleanup operations. The SA&E mission is to provide support to direct program operations through safety analysis and risk documentation and to maintain an infrastructure responsive to the evolutionary climate at the Hanford Site. SA&E will maintain the appropriate skills mix necessary to fulfill the customers need to conduct all operations in a safe and cost-effective manner while ensuring the safety of the public and the onsite worker.

  7. New Methodology for a Comprehensive Modular Safety Control System in a Cyclotron Site

    International Nuclear Information System (INIS)

    Kaufman, Y.; Kravitz, M.; Arad, M.; Osovizky, A.; Paran, J.; Sarussi, B.; Ellenbogen, M.; Tal, N.

    2004-01-01

    This Paper describes a new methodology for a comprehensive modular Safety Control System (SCS), for a cyclotron site. The developed SCS is a modular approach for controlling the production procedures, safety conditions and documentation aspects in the Cyclotron site. Usually, the safety conditions in cyclotron sites are maintained by a variety of sensors. The cyclotron is supplied from the manufacturer with a self-integrated control system for its operation, yet the comprehensive SCS has to be defined and setup by the customer. Therefore, customers face a lot of integration problems in trying to combine all the signals from the different safety systems such as radiation monitoring, environmental and access control, in order to maintain proper safety working conditions. The presented SCS design provides main user interface and the complete safety solution required by including preset control logic definitions and open logic for specific user applications. The knowledge for the preset control logic definitions was gathered in previous projects. Failure Mode and Effects Analysis (FMEA) method has been implemented on the SCS to analyze the potential failure modes and their impact on the product reliability

  8. Workers’ Age and the Impact of Psychological Factors on the Perception of Safety at Construction Sites

    Directory of Open Access Journals (Sweden)

    Muhammad Dawood Idrees

    2017-05-01

    Full Text Available The safety of construction workers is always a major concern at construction sites as the construction industry is inherently dangerous with many factors influencing worker safety. Several studies concluded that psychological factors such as workload, organizational relationships, mental stress, job security, and job satisfaction have significant effects on workers’ safety. However, research on psychological factors that are characteristic of different age groups have been limited. The aim of this study was to examine the impact of psychological factors on the perception of worker safety for two different age groups. After an extensive literature review, different psychological factors were identified, and a hypothetical research model was developed based on psychological factors that could affect workers’ perception of safety. A survey instrument was developed, and data were collected from seven different construction sites in Pakistan. Structural equation modeling (SEM was employed to test the hypothetical model for both age groups. The results revealed that workload and job satisfaction are significantly dominant factors on workers’ perception of safety in older workers, whereas organizational relationships, mental stress, and job security are dominant factors for younger workers at construction sites.

  9. Overheads, Safety Analysis and Engineering FY 1995 Site Support Program Plan WBS 6.3.5

    International Nuclear Information System (INIS)

    DiVincenzo, E.P.

    1994-01-01

    The Safety Analysis ampersand Engineering (SA ampersand E) department provides core competency for safety analysis and risk documentation that supports achievement of the goals and mission as described in the Hanford Mission Plan, Volume I, Site Guidance (DOE-RL 1993). SA ampersand E operations are integrated into the programs that plan and conduct safe waste management, environmental restoration, and operational activities. SA ampersand E personnel are key members of task teams assigned to eliminate urgent risks and inherent threats that exist at the Hanford Site. Key to ensuring protection of public health and safety, and that of onsite workers, are the products and services provided by the department. SA ampersand E will continue to provide a leadership role throughout the DOE complex with innovative, cost-effective approaches to ensuring safety during environmental cleanup operations. The SA ampersand E mission is to provide support to direct program operations through safety analysis and risk documentation and to maintain an infrastructure responsive to the evolutionary climate at the Hanford Site. SA ampersand E will maintain the appropriate skills mix necessary to fulfill the customers need to conduct all operations in a safe and cost-effective manner while ensuring the safety of the public and the onsite worker

  10. Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

    Energy Technology Data Exchange (ETDEWEB)

    Maheras, Steven J.; Best, Ralph E.; Ross, Steven B.; Buxton, Kenneth A.; England, Jeffery L.; McConnell, Paul E.

    2013-09-30

    This report fulfills the M2 milestone M2FT-13PN0912022, “Stranded Sites De-Inventorying Report.” In January 2013, the U.S. Department of Energy (DOE) issued the Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (DOE 2013). Among the elements contained in this strategy is an initial focus on accepting used nuclear fuel from shutdown reactor sites. This focus is consistent with the recommendations of the Blue Ribbon Commission on America’s Nuclear Future, which identified removal of stranded used nuclear fuel at shutdown sites as a priority so that these sites may be completely decommissioned and put to other beneficial uses (BRC 2012). Shutdown sites are defined as those commercial nuclear power reactor sites where the nuclear power reactors have been shut down and the site has been decommissioned or is undergoing decommissioning. In this report, a preliminary evaluation of removing used nuclear fuel from 12 shutdown sites was conducted. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, and San Onofre. These sites have no other operating nuclear power reactors at their sites and have also notified the U.S. Nuclear Regulatory Commission that their reactors have permanently ceased power operations and that nuclear fuel has been permanently removed from their reactor vessels. Shutdown reactors at sites having other operating reactors are not included in this evaluation.

  11. Public safety risk management at socio-economic and / or historic-cultural significant dam sites

    Energy Technology Data Exchange (ETDEWEB)

    Earle, Gordon D.; Ryan, Katherine; Pyykonen, Nicole K.; Pitts, Lucas [Otonabee Region Conservation Authority, Peterborough, (Canada)

    2010-07-01

    The Lang Dam and adjoining gristmill, located near Peterborough are integral parts of the Lang Pioneer Village museum. Activities occurring within close proximity to the dam have led to safety issues. The owner (ORCA) has developed and implemented public safety management plans (PSMPs) for each of its water control structures, including the Lang Dam. ORCA gave special attention to the social, economic, aesthetic, historic and cultural dimensions associated the implementation of public safety management plans. These factors play a significant role in how well public safety measures (PSMs) are received by stakeholder groups and the general public. This paper reported the challenges of developing and implementing a PSMP for the Lang Dam, with the focus on property site-specific PSMS while preserving socio-economic and historic-cultural character and values. It was demonstrated that the dam owners, regulatory authorities, control agencies and preservationists need to come together to develop a holistic public safety management process.

  12. Evaluating safety-critical organizations - emphasis on the nuclear industry

    Energy Technology Data Exchange (ETDEWEB)

    Reiman, Teemu; Oedewald, Pia (VTT, Technical Research Centre of Finland (Finland))

    2009-04-15

    An organizational evaluation plays a key role in the monitoring, as well as controlling and steering, of the organizational safety culture. If left unattended, organizations have a tendency to gradually drift into a condition where they have trouble identifying their vulnerabilities and mechanisms or practices that create or maintain these vulnerabilities. The aim of an organizational evaluation should be to promote increased understanding of the sociotechnical system and its changing vulnerabilities. Evaluation contributes to organizational development and management. Evaluations are used in various situations, but when the aim is to learn about possible new vulnerabilities, identify organizational reasons for problems, or prepare for future challenges, the organization is most open to genuine surprises and new findings. It is recommended that organizational evaluations should be conducted when - there are changes in the organizational structures - new tools are implemented - when the people report increased workplace stress or a decreased working climate - when incidents and near-misses increase - when work starts to become routine - when weak signals (such as employees voicing safety concerns or other worries, the organization 'feels' different, organizational climate has changed) are perceived. In organizations that already have a high safety level, safety managers work for their successors. This means that they seldom see the results of their successful efforts to improve safety. This is due to the fact that it takes time for the improvement to become noticeable in terms of increased measurable safety levels. The most challenging issue in an organizational evaluation is the definition of criteria for safety. We have adopted a system safety perspective and we state that an organization has a high potential for safety when - safety is genuinely valued and the members of the organization are motivated to put effort on achieving high levels of safety

  13. Evaluating safety-critical organizations - emphasis on the nuclear industry

    International Nuclear Information System (INIS)

    Reiman, Teemu; Oedewald, Pia

    2009-04-01

    An organizational evaluation plays a key role in the monitoring, as well as controlling and steering, of the organizational safety culture. If left unattended, organizations have a tendency to gradually drift into a condition where they have trouble identifying their vulnerabilities and mechanisms or practices that create or maintain these vulnerabilities. The aim of an organizational evaluation should be to promote increased understanding of the sociotechnical system and its changing vulnerabilities. Evaluation contributes to organizational development and management. Evaluations are used in various situations, but when the aim is to learn about possible new vulnerabilities, identify organizational reasons for problems, or prepare for future challenges, the organization is most open to genuine surprises and new findings. It is recommended that organizational evaluations should be conducted when - there are changes in the organizational structures - new tools are implemented - when the people report increased workplace stress or a decreased working climate - when incidents and near-misses increase - when work starts to become routine - when weak signals (such as employees voicing safety concerns or other worries, the organization 'feels' different, organizational climate has changed) are perceived. In organizations that already have a high safety level, safety managers work for their successors. This means that they seldom see the results of their successful efforts to improve safety. This is due to the fact that it takes time for the improvement to become noticeable in terms of increased measurable safety levels. The most challenging issue in an organizational evaluation is the definition of criteria for safety. We have adopted a system safety perspective and we state that an organization has a high potential for safety when - safety is genuinely valued and the members of the organization are motivated to put effort on achieving high levels of safety - it is

  14. Empirical estimation of school siting parameter towards improving children's safety

    International Nuclear Information System (INIS)

    Aziz, I S; Yusoff, Z M; Rasam, A R A; Rahman, A N N A; Omar, D

    2014-01-01

    Distance from school to home is a key determination in ensuring the safety of hildren. School siting parameters are made to make sure that a particular school is located in a safe environment. School siting parameters are made by Department of Town and Country Planning Malaysia (DTCP) and latest review was on June 2012. These school siting parameters are crucially important as they can affect the safety, school reputation, and not to mention the perception of the pupil and parents of the school. There have been many studies to review school siting parameters since these change in conjunction with this ever-changing world. In this study, the focus is the impact of school siting parameter on people with low income that live in the urban area, specifically in Johor Bahru, Malaysia. In achieving that, this study will use two methods which are on site and off site. The on site method is to give questionnaires to people and off site is to use Geographic Information System (GIS) and Statistical Product and Service Solutions (SPSS), to analyse the results obtained from the questionnaire. The output is a maps of suitable safe distance from school to house. The results of this study will be useful to people with low income as their children tend to walk to school rather than use transportation

  15. Safety evaluation for packaging (onsite) for the Pacific Northwest National Laboratory HEPA filter box

    International Nuclear Information System (INIS)

    McCoy, J.C.

    1998-01-01

    This safety evaluation for packaging (SEP) evaluates and documents the safe onsite transport of eight high-efficiency particulate air (HEPA) filters in the Pacific Northwest National Laboratory HEPA Filter Box from the 300 Area of the Hanford Site to the Central Waste Complex and on to burial in the 200 West Area. Use of this SEP is authorized for 1 year from the date of release

  16. Safety Considerations in the Selection of Nuclear Power Plant Candidate Sites in Johor State, Malaysia

    International Nuclear Information System (INIS)

    Ramli, A.T.; Basri, N.A.; Abu Hanifah, N.Z.H.

    2014-01-01

    Nuclear power is considered as one of the best options for future energy development in Malaysia. Since Malaysia has no experience in nuclear energy generation / production, commissioning the first nuclear power plant needs tremendous effort in various aspects. The most obvious challenges are to ensure the nation’s safety and to handle security issues that may arise from a nuclear power plant site. This paper aims to propose a site for nuclear power plant in Johor State, Malaysia as well as listing the possible safety challenges in the process. The site selection uses the Malaysian Atomic Energy Licensing Board (AELB) guideline document as the main reference, supported by documents from International Atomic Energy Agency (IAEA) and from various countries. Only five site characteristics are chosen as study parameters – geological features and seismic data, air dispersion analysis using meteorological data, population distribution, safety zones and emergency supports. This paper concluded that site number 2 (CS2) at Tanjung Tenggaroh, Mersing is the most suitable area for nuclear power plant in Johor state. It has the least possible risks, safety and security issues. (author)

  17. Safety Considerations in the Selection of Nuclear Power Plant Candidate Sites in Johor State, Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Ramli, A. T.; Basri, N. A.; Abu Hanifah, N. Z.H., [Department of Physics, Faculty of Science Universiti Teknologi Malaysia Johor (Malaysia)

    2014-10-15

    Nuclear power is considered as one of the best options for future energy development in Malaysia. Since Malaysia has no experience in nuclear energy generation / production, commissioning the first nuclear power plant needs tremendous effort in various aspects. The most obvious challenges are to ensure the nation’s safety and to handle security issues that may arise from a nuclear power plant site. This paper aims to propose a site for nuclear power plant in Johor State, Malaysia as well as listing the possible safety challenges in the process. The site selection uses the Malaysian Atomic Energy Licensing Board (AELB) guideline document as the main reference, supported by documents from International Atomic Energy Agency (IAEA) and from various countries. Only five site characteristics are chosen as study parameters – geological features and seismic data, air dispersion analysis using meteorological data, population distribution, safety zones and emergency supports. This paper concluded that site number 2 (CS2) at Tanjung Tenggaroh, Mersing is the most suitable area for nuclear power plant in Johor state. It has the least possible risks, safety and security issues. (author)

  18. Review Article : Utilization of Environmental Radiochemistry Techniques for Selection and Evaluation of Nuclear Facility Sites

    International Nuclear Information System (INIS)

    Atta, E.R.; Madbouly, A.M.; Zakaria, Kh.M.

    2016-01-01

    This research review puts necessary considerations on the available environmental radiochemistry techniques for selection and evaluation of a nuclear facility sites.The main bjective in site evaluation for nuclear facilities in terms of nuclear safety is to protect the site workers, the public and the environment from the effects of ionizing radiation release from nuclear facilities due to accidents. The extreme sensitivity and speed of radiochemical methods make their applications of considerable importance in several fields and they have found many uses. Information about the existed radioactivity in the different nuclear facilities is an essential requirement for their environmental assessment. It is necessary to estimate the various radioactivity levels in the environment through qualitative and quantitative analytical techniques and to assess the potential effects of the nuclear facility in the region by considering the characteristics of sites.The siting and site evaluation requirements are discussed. Emphasis was given to types of radiochemical techniques used for characterization of the site parameters which determine the potential hazards of the site on the facility and the facility on the site. Emphasis has been also given to the quantitative and qualitative analysis of naturally occurring radionuclides for monitoring and control .There are some techniques employed such as radioactive tracer technique, liquid scintillation technique, gamma spectrometry technique, neutron activation analysis technique, fluorimetric technique and isotope hydrology technique.

  19. Evaluation for nuclear safety-critical software reliability of DCS

    International Nuclear Information System (INIS)

    Liu Ying

    2015-01-01

    With the development of control and information technology at NPPs, software reliability is important because software failure is usually considered as one form of common cause failures in Digital I and C Systems (DCS). The reliability analysis of DCS, particularly qualitative and quantitative evaluation on the nuclear safety-critical software reliability belongs to a great challenge. To solve this problem, not only comprehensive evaluation model and stage evaluation models are built in this paper, but also prediction and sensibility analysis are given to the models. It can make besement for evaluating the reliability and safety of DCS. (author)

  20. Hanford Site Environmental Safety and Health Fiscal Year 2001 Budget-Risk management summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    1999-05-12

    The Hanford Site Environment, Safety and Health (ES&H) Budget-Risk Management Summary report is prepared to support the annual request to sites in the U.S. Department of Energy (DOE) Complex by DOE, Headquarters. The request requires sites to provide supplementary crosscutting information related to ES&H activities and the ES&H resources that support these activities. The report includes the following: (1) A summary status of fiscal year (FY) 1999 ES&H performance and ES&H execution commitments; (2)Status and plans of Hanford Site Office of Environmental Management (EM) cleanup activities; (3) Safety and health (S&H) risk management issues and compliance vulnerabilities of FY 2001 Target Case and Below Target Case funding of EM cleanup activities; (4) S&H resource planning and crosscutting information for FY 1999 to 2001; and (5) Description of indirect-funded S&H activities.

  1. Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

    Energy Technology Data Exchange (ETDEWEB)

    Maheras, Steven J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Best, Ralph E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ross, Steven B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Buxton, Kenneth A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); England, Jeffery L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); McConnell, Paul E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Massaro, Lawrence M. [Fermi Research Alliance (FRA), Batavia, IL (United States); Jensen, Philip J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-09-30

    A preliminary evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power plant sites was performed. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: Characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory A description of the on-site infrastructure at the shutdown sites An evaluation of the near-site transportation infrastructure and transportation experience at the shutdown sites An evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF and GTCC waste were the U.S. Department of Energy (DOE) spent nuclear fuel inventory database, industry publications such as StoreFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of on-site infrastructure and near-site transportation infrastructure and experience included information collected during site visits, information provided by managers at the shutdown sites, Facility Interface Data Sheets compiled for DOE in 2005, Services Planning Documents prepared for DOE in 1993 and 1994, industry publications such as Radwaste Solutions, and Google Earth. State staff, State Regional Group representatives, a Tribal representative, and a Federal Railroad Administration representative have participated in nine of the shutdown site visits. Every shutdown site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an

  2. A new methodology for repository site suitability evaluation

    International Nuclear Information System (INIS)

    Miller, I.; Kossik, R.; Cunnane, M.

    1992-01-01

    Golder Associates Inc. (GAI) has developed a probabilistic total system performance assessment and strategy evaluation model (RIP) which can be applied in an iterative manner to evaluate repository site suitability and guide site characterization. The major portion of the software is the performance assessment model, which consists of a series of coupled component models for radionuclide transfer. The performance model itself is embedded within a decision analysis model which allows the user to evaluate alternative site characterization strategies. This paper provides an overview of the methodology, and summarizes the basic concepts of RIP

  3. Safety evaluation for the inner canister closure station

    International Nuclear Information System (INIS)

    Glasscock, J.R.

    1987-01-01

    The Inner Canister Closure Station (ICCS), built by Remote Technology Corporation, will be operability tested. The ICCS is used to remotely leak test Inner Canister Closures (ICC's) and replace ICC's that are not water tight. After operability testing, the ICCS will be inspected and sent to the 717-F mock-up shop for remotability demonstration and dimensional checks, then installed in the Vitrification Building, 221-S. An analysis of potential safety hazards, equipment safety features, and procedural controls indicates that the ICCS can be operated without undue hazard to employees or to the public. A safety inspection and a new equipment inspection will be held before operation to verify that the ICCS meets Savannah River Site safety requirements. 4 refs., 6 figs

  4. Development of safety analysis technology for integral reactor; evaluation on safety concerns of integral reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hee Chul; Kim, Woong Sik; Lee, J. H. [Korea Institute of Nuclear Safety, Taejeon (Korea)

    2002-03-01

    The Nuclear Desalination Plant (NDP) is being developed to produce electricity and fresh water, and is expected to locate near population zone. In the aspect of safety, it is required to protect the public and environment from the possible releases of fission products and to prevent the fresh water from the contamination of radioactivity. Thus, in this study, the safety characteristics of the integral reactor adopting passive and inherent safety features significantly different from existing nuclear power plants were investigated. Also, safety requirements applicable to the NDP were analyzed based on the regulatory requirements for current light water reactor and advanced reactor designs, and user requirements for small-medium size reactors. Based on these analyses, some safety concerns to be considered in the design stage have been identified and discussed. They include the use of proven technology for new safety features, systematic event classification and selection, strengthening containment function, and the safety impacts on desalination-related systems. The study presents the general safety requirements applicable to licensing of an integral reactor and suggests additional regulatory requirements, which need to be developed, based on the direction to resolution of the safety concerns. The efforts to identify and technically resolve the safety concerns in the design stage will provide the early confidence of SMART safety and the technical basis to evaluate the safety to designers and reviewers in the future. Suggestion on the development of additional regulatory requirements will contribute for the regulator to taking actions for licensing of an integral reactor. 66 refs., 5 figs., 24 tabs. (Author)

  5. Geoscientific programme for investigation and evaluation of sites for the deep repository

    International Nuclear Information System (INIS)

    2000-08-01

    SKB's goal is to be able to commence site investigations in 2002. Extensive preparations are now being made for this transition to the next phase in the siting process for the deep repository. This report describes the investigation and evaluation programme, which is focused on a deep repository in accordance with the KBS-3 method for spent nuclear fuel. When areas for site investigations have been chosen, the programmes will be adapted to the site-specific conditions. The geoscientific work during the site investigation phase is supposed to provide the broad knowledge base that is required to evaluate the suitability of investigated sites for a deep repository. The material must be comprehensive enough to: show whether the selected site satisfies fundamental safety requirements; permit comparisons with other investigated sites; and serve as a basis for adaptation of the deep repository to the properties and characteristics of the site with an acceptable impact on society and the environment. The work is being carried out in consultation with municipalities, regulatory authorities and nearby residents. The main product of the investigations is a site description, which presents collected data and interpreted parameters that are of importance both for the overall scientific understanding of the site and for the analyses and assessments that are made of design and safety assessment with respect to the deep repository's layout and construction as well as its long-term performance and radiological safety. The site description should furthermore present an integrated description of the site (geosphere and biosphere) and its regional environs with respect to current state and naturally ongoing processes. A technical risk evaluation is carried out, by which is meant a description of uncertainties in calculations and the environmental impact of the civil engineering work. The main product of the safety assessment is a safety report, which analyzes whether long-term safety

  6. Geoscientific programme for investigation and evaluation of sites for the deep repository

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-08-01

    SKB's goal is to be able to commence site investigations in 2002. Extensive preparations are now being made for this transition to the next phase in the siting process for the deep repository. This report describes the investigation and evaluation programme, which is focused on a deep repository in accordance with the KBS-3 method for spent nuclear fuel. When areas for site investigations have been chosen, the programmes will be adapted to the site-specific conditions. The geoscientific work during the site investigation phase is supposed to provide the broad knowledge base that is required to evaluate the suitability of investigated sites for a deep repository. The material must be comprehensive enough to: show whether the selected site satisfies fundamental safety requirements; permit comparisons with other investigated sites; and serve as a basis for adaptation of the deep repository to the properties and characteristics of the site with an acceptable impact on society and the environment. The work is being carried out in consultation with municipalities, regulatory authorities and nearby residents. The main product of the investigations is a site description, which presents collected data and interpreted parameters that are of importance both for the overall scientific understanding of the site and for the analyses and assessments that are made of design and safety assessment with respect to the deep repository's layout and construction as well as its long-term performance and radiological safety. The site description should furthermore present an integrated description of the site (geosphere and biosphere) and its regional environs with respect to current state and naturally ongoing processes. A technical risk evaluation is carried out, by which is meant a description of uncertainties in calculations and the environmental impact of the civil engineering work. The main product of the safety assessment is a safety report, which analyzes whether long

  7. Closure of the condensed-phase organic-nitrate reaction unreviewed safety question at Hanford site

    International Nuclear Information System (INIS)

    COWLEY, W.L.

    1999-01-01

    A discovery Unreviewed Safety Question (USQ) was declared on the underground waste storage tanks at the Hanford Site in May 1996. The USQ was for condensed-phase organic-nitrate reactions (sometimes called organic complexant reactions) in the tanks. This paper outlines the steps taken to close the USQ, and resolve the related safety issue. Several processes were used at the Hanford Site to extract and/or process plutonium. These processes resulted in organic complexants (for chelating multivalent cations) and organic extraction solvents being sent to the underground waste storage tanks. This paper addresses the organic complexant hazard. The organic complexants are in waste matrices that include inert material, diluents, and potential oxidizers. In the presence of oxidizing material, the complexant salts can be made to react exothermically by heating to high temperatures or by applying an external ignition source of sufficient energy. The first organic complexant hazard assessments focused on determining whether a hulk runaway reaction could occur, similar to the 1957 accident at Kyshtm (a reprocessing plant in the former U.S.S.R.). Early analyses (1977 through 1994) examined organic-nitrate reaction onset temperatures and concluded that a bulk runaway reaction could not occur at the Hanford Site because tank temperatures were well below that necessary for bulk runaway. Therefore, it was believed that organic-nitrate reactions were adequately described in the then current Authorization Basis (AB). Subsequent studies examined a different accident scenario, propagation resulting from an external ignition source (e.g., lightning or welding slag) that initiates a combustion front that propagates through the organic waste. A USQ evaluation determined that localized high energy ignition sources were credible, and that point source ignition of organic complexant waste was not adequately addressed i n the then existing AB. Consequently, the USQ was declared on the

  8. Power plant site evaluation - Douglas Point site. Volume 1, part 2. Final report

    International Nuclear Information System (INIS)

    1977-11-01

    This is part of a series of reports containing an evaluation of the proposed Douglas Point nuclear generating station site located on the Potomac River in Maryland 30 miles south of Washington, DC. This report contains sections on cooling tower air emissions, noise impacts, transmission line effects, radiation from normal releases, site features affecting radiological accidents, and meteorology

  9. Methods of Identification and Evaluation of Brownfield Sites

    Directory of Open Access Journals (Sweden)

    Safet Kurtović

    2014-04-01

    Full Text Available The basic objective of this paper was to determine the importance and potential restoration of brownfield sites in terms of economic prosperity of a particular region or country. In addition, in a theoretical sense, this paper presents the methods used in the identification of brownfield sites such as Smart Growth Network model and Thomas GIS model, and methods for evaluation of brownfield sites or the indexing method, cost-benefit and multivariate analysis.

  10. Safety evaluation of a hydrogen fueled transit bus

    Energy Technology Data Exchange (ETDEWEB)

    Coutts, D.A.; Thomas, J.K.; Hovis, G.L.; Wu, T.T. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1997-12-31

    Hydrogen fueled vehicle demonstration projects must satisfy management and regulator safety expectations. This is often accomplished using hazard and safety analyses. Such an analysis has been completed to evaluate the safety of the H2Fuel bus to be operated in Augusta, Georgia. The evaluation methods and criteria used reflect the Department of Energy`s graded approach for qualifying and documenting nuclear and chemical facility safety. The work focused on the storage and distribution of hydrogen as the bus motor fuel with emphases on the technical and operational aspects of using metal hydride beds to store hydrogen. The safety evaluation demonstrated that the operation of the H2Fuel bus represents a moderate risk. This is the same risk level determined for operation of conventionally powered transit buses in the United States. By the same criteria, private passenger automobile travel in the United States is considered a high risk. The evaluation also identified several design and operational modifications that resulted in improved safety, operability, and reliability. The hazard assessment methodology used in this project has widespread applicability to other innovative operations and systems, and the techniques can serve as a template for other similar projects.

  11. Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

    Energy Technology Data Exchange (ETDEWEB)

    Maheras, Steven J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Best, Ralph E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ross, Steven B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Buxton, Kenneth A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); England, Jeffery L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); McConnell, Paul E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Massaro, Lawrence M. [Federal Railroad Administration (FRA) (United States); Jensen, Philip J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-10-01

    This report presents a preliminary evaluation of removing used nuclear fuel (UNF) from 12 shutdown nuclear power plant sites. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, and San Onofre. The evaluation was divided into four components: characterization of the UNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory; a description of the on-site infrastructure and conditions relevant to transportation of UNF and GTCC waste; an evaluation of the near-site transportation infrastructure and experience relevant to shipping transportation casks containing UNF and GTCC waste, including identification of gaps in information; and, an evaluation of the actions necessary to prepare for and remove UNF and GTCC waste. The primary sources for the inventory of UNF and GTCC waste are the U.S. Department of Energy (DOE) RW-859 used nuclear fuel inventory database, industry sources such as StoreFUEL and SpentFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of site and near-site transportation infrastructure and experience included observations and information collected during visits to the Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion sites; information provided by managers at the shutdown sites; Facility Interface Data Sheets compiled for DOE in 2005; Services Planning Documents prepared for DOE in 1993 and 1994; industry publications such as Radwaste Solutions; and Google Earth. State and Regional Group representatives, a Tribal representative, and a Federal Railroad Administration representative participated in six of the shutdown site

  12. Monitored retrievable storage facility site screening and evaluation report

    International Nuclear Information System (INIS)

    1985-05-01

    The Nuclear Waste Policy Act of 1982 directs the Department of Energy to ''complete a detailed study of the need for and feasibility of, and to submit to the Congress a proposal for, the construction of one or more monitored retrievable storage facilities for high level radioactive waste and spent nuclear fuel.'' The Act directs that the proposal includes site specific designs. Further, the proposal is to include, ''for the first such facility, at least three alternative sites and at least five alternative combinations of such proposed sites and facility designs hor-ellipsis'' as well as a recommendation of ''the combination among the alternatives that the Secretary deems preferable.'' An MRS Site Screening Task Force has been formed to help identify and evaluate potential MRS facility sites within a preferred region and with the application of a siting process and criteria developed by the DOE. The activities of the Task Force presented in this report include: site evaluations (sections 10 through 12) where the rationale for the site evaluations are presented, along with each evaluation and findings of the Task Force. This in Volume 2 of a three volume document

  13. Monitored Retrievable Storage facility site screening and evaluation report

    International Nuclear Information System (INIS)

    1985-05-01

    The Nuclear Waste Policy Act of 1982 directs the Department of Energy to ''complete a detailed study of the need for and feasibility of, and to submit to the Congress a proposal for, the construction of one or more monitored retrievable storage facilities for high level radioactive waste and spent nuclear fuel.'' The Act directs that the proposal includes site specific designs. Further, the proposal is to include, ''for the first such facility, at least three alternative sites and at least five alternative combinations of such proposed sites and facility designs hor-ellipsis'' as well as a recommendation of ''the combination among the alternatives that the Secretary deems preferable.'' An MRS Site Screening Task Force has been formed to help identify and evaluate potential MRS facility sites within a preferred region and with the application of a siting process and criteria developed by the DOE. The activities of the Task Force presented in this report, all site evaluations (sections 13 through 16) where the rationale for the site evaluations are presented, along with each evaluation and findings of the Task Force. This is Volume 3 of a three volume document. References are also included in this volume

  14. Monitored retrievable storage facility site screening and evaluation report

    Energy Technology Data Exchange (ETDEWEB)

    none,

    1985-05-01

    The Nuclear Waste Policy Act of 1982 directs the Department of Energy to complete a detailed study of the need for and feasibility of, and to submit to the Congress a proposal for, the construction of one or more monitored retrievable storage facilities for high level radioactive waste and spent nuclear fuel.'' The Act directs that the proposal includes site specific designs. Further, the proposal is to include, for the first such facility, at least three alternative sites and at least five alternative combinations of such proposed sites and facility designs{hor ellipsis}'' as well as a recommendation of the combination among the alternatives that the Secretary deems preferable.'' An MRS Site Screening Task Force has been formed to help identify and evaluate potential MRS facility sites within a preferred region and with the application of a siting process and criteria developed by the DOE. The activities of the Task Force presented in this report include: site evaluations (sections 10 through 12) where the rationale for the site evaluations are presented, along with each evaluation and findings of the Task Force. This in Volume 2 of a three volume document.

  15. Monitored Retrievable Storage facility site screening and evaluation report

    Energy Technology Data Exchange (ETDEWEB)

    none,

    1985-05-01

    The Nuclear Waste Policy Act of 1982 directs the Department of Energy to complete a detailed study of the need for and feasibility of, and to submit to the Congress a proposal for, the construction of one or more monitored retrievable storage facilities for high level radioactive waste and spent nuclear fuel.'' The Act directs that the proposal includes site specific designs. Further, the proposal is to include, for the first such facility, at least three alternative sites and at least five alternative combinations of such proposed sites and facility designs {hor ellipsis}'' as well as a recommendation of the combination among the alternatives that the Secretary deems preferable.'' An MRS Site Screening Task Force has been formed to help identify and evaluate potential MRS facility sites within a preferred region and with the application of a siting process and criteria developed by the DOE. The activities of the Task Force presented in this report, all site evaluations (sections 13 through 16) where the rationale for the site evaluations are presented, along with each evaluation and findings of the Task Force. This is Volume 3 of a three volume document. References are also included in this volume.

  16. Krypton-85 hydrofracture engineering feasibility and safety evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Peretz, F.J.; Muller, M.E.; Pan, P.Y.

    1981-07-01

    Engineering studies have been made to determine the hazards associated with the disposal of /sup 85/Kr using the hydrofracture process. To assess the hazards, an effort has been made to identify the equipment required to entrain and dissolve the noble gas into the grout stream at hydrofracture pressure (up to 350 bar). Off-the-shelf or slightly modified equipment has been identified for safe and effective compression and gas-grout mixing. Each monthly injection disposes of 1.6 x 10/sup 6/ Ci of /sup 85/Kr. By connecting only one gas cylinder to the injection system at a time, the maximum amount of krypton likely to be released as a result of equipment failure is limited to 128,000 Ci. An evaluation by Los Alamos Technical Associates shows that releasing this amount of gas in less than one hour under worst-case meteorological conditions through a 30-m stack would result in a whole-body dose of 170 millirem at a distance of 1 km from the facility. A krypton collection and recovery system can further reduce this dose to 17 millirem; increasing the distance to the site boundary to 3 km can also reduce the dose by a factor of ten. Lung and skin dose estimates are 1.6 and 120 times the whole-body dose, respectively. These are all worst-case values; releases under more typical conditions would result in a significantly lower dose. No insurmountable safety or engineering problems have been identified.

  17. Krypton-85 hydrofracture engineering feasibility and safety evaluation

    International Nuclear Information System (INIS)

    Peretz, F.J.; Muller, M.E.; Pan, P.Y.

    1981-07-01

    Engineering studies have been made to determine the hazards associated with the disposal of 85 Kr using the hydrofracture process. To assess the hazards, an effort has been made to identify the equipment required to entrain and dissolve the noble gas into the grout stream at hydrofracture pressure (up to 350 bar). Off-the-shelf or slightly modified equipment has been identified for safe and effective compression and gas-grout mixing. Each monthly injection disposes of 1.6 x 10 6 Ci of 85 Kr. By connecting only one gas cylinder to the injection system at a time, the maximum amount of krypton likely to be released as a result of equipment failure is limited to 128,000 Ci. An evaluation by Los Alamos Technical Associates shows that releasing this amount of gas in less than one hour under worst-case meteorological conditions through a 30-m stack would result in a whole-body dose of 170 millirem at a distance of 1 km from the facility. A krypton collection and recovery system can further reduce this dose to 17 millirem; increasing the distance to the site boundary to 3 km can also reduce the dose by a factor of ten. Lung and skin dose estimates are 1.6 and 120 times the whole-body dose, respectively. These are all worst-case values; releases under more typical conditions would result in a significantly lower dose. No insurmountable safety or engineering problems have been identified

  18. Occupational safety of different industrial sectors in Khartoum State, Sudan. Part 1: Safety performance evaluation.

    Science.gov (United States)

    Zaki, Gehan R; El-Marakby, Fadia A; H Deign El-Nor, Yasser; Nofal, Faten H; Zakaria, Adel M

    2012-12-01

    Safety performance evaluation enables decision makers improve safety acts. In Sudan, accident records, statistics, and safety performance were not evaluated before maintenance of accident records became mandatory in 2005. This study aimed at evaluating and comparing safety performance by accident records among different cities and industrial sectors in Khartoum state, Sudan, during the period from 2005 to 2007. This was a retrospective study, the sample in which represented all industrial enterprises in Khartoum state employing 50 workers or more. All industrial accident records of the Ministry of Manpower and Health and those of different enterprises during the period from 2005 to 2007 were reviewed. The safety performance indicators used within this study were the frequency-severity index (FSI) and fatal and disabling accident frequency rates (DAFR). In Khartoum city, the FSI [0.10 (0.17)] was lower than that in Bahari [0.11 (0.21)] and Omdurman [0.84 (0.34)]. It was the maximum in the chemical sector [0.33 (0.64)] and minimum in the metallurgic sector [0.09 (0.19)]. The highest DAFR was observed in Omdurman [5.6 (3.5)] and in the chemical sector [2.5 (4.0)]. The fatal accident frequency rate in the mechanical and electrical engineering industry was the highest [0.0 (0.69)]. Male workers who were older, divorced, and had lower levels of education had the lowest safety performance indicators. The safety performance of the industrial enterprises in Khartoum city was the best. The safety performance in the chemical sector was the worst with regard to FSI and DAFR. The age, sex, and educational level of injured workers greatly affect safety performance.

  19. FLIGHT SAFETY MANAGEMENT PROBLEMS AND EVALUATION OF FLIGHT SAFETY LEVEL OF AN AVIATION ENTERPRISE

    Directory of Open Access Journals (Sweden)

    B. V. Zubkov

    2017-01-01

    Full Text Available This article is devoted to studying the problem of safety management system (SMS and evaluating safety level of an aviation enterprise.This article discusses the problems of SMS, presented at the 41st meeting of the Russian Aviation Production Commanders Club in June 2014 in St. Petersburg in connection with the verification of the status of the CA of the Russian Federation by the International Civil Aviation Organization (ICAO in the same year, a set of urgent measures to eliminate the deficiencies identified in the current safety management system by participants of this meeting were proposed.In addition, the problems of evaluating flight safety level based on operation data of an aviation enterprise were analyzed. This analysis made it possible to take into account the problems listed in this article as a tool for a comprehensive study of SMS parameters and allows to analyze the quantitative indicators of the flights safety level.The concepts of Acceptable Safety Level (ASL indicators are interpreted differently depending on the available/applicable methods of their evaluation and how to implement them in SMS. However, the indicators for assessing ASL under operational condition at the aviation enterprise should become universal. Currently, defined safety levels and safety indicators are not yet established functionally and often with distorted underrepresented models describing their contextual contents, as well as ways of integrating them into SMS aviation enterprise.The results obtained can be used for better implementation of SMS and solving problems determining the aviation enterprise technical level of flight safety.

  20. Buffer, backfill and closure process report for the safety assessment SR-Site

    International Nuclear Information System (INIS)

    Sellin, Patrik

    2010-11-01

    This report gives an account of how processes in buffer, deposition tunnel backfill and the closure important for the long-term evolution of a KBS-3 repository for spent nuclear fuel, will be documented in the safety assessment SR-Site

  1. The motivational safety helmet : Redesign suggestions improving the intrinsic motivation of construction site workers

    NARCIS (Netherlands)

    Beldman, T. (Teunis); Boer, de J. (Johannes); Lemmens, P. (Pim); Stilma, M. (Margot)

    2014-01-01

    In reaction to the lack of intrinsic motivation of construction site workers, to wear their safety helmets at all times, a series of research projects studied causes and possible solutions. Goal is to gain an inspirational discussion to get the design onto the next level. This paper describes a

  2. Buffer, backfill and closure process report for the safety assessment SR-Site

    Energy Technology Data Exchange (ETDEWEB)

    Sellin, Patrik (ed.)

    2010-11-15

    This report gives an account of how processes in buffer, deposition tunnel backfill and the closure important for the long-term evolution of a KBS-3 repository for spent nuclear fuel, will be documented in the safety assessment SR-Site

  3. Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Flynn, N.C. Bechtel Jacobs

    2008-04-21

    The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable

  4. Safety performance evaluation using proactive indicators in a selected industry

    Directory of Open Access Journals (Sweden)

    Abolfazl Barkhordari

    2015-03-01

    Full Text Available Background & Objectives: Quality and effectiveness of safety systems are critical factors in achieving their goals. This study was aimed to represent a method for performance evaluation of safety systems by proactive indicators using different updated models in the field of safety which will be tested in a selected industry. Methods: This study is a cross-sectional study. Proactive indicators used in this study were: Unsafe acts rate, Safety Climate, Accident Proneness, and Near-miss incident rate. The number of in 1473 safety climate questionnaires and 543 Accident Proneness questionnaires was completed. Results: The minimum and maximum safety climate score were 56.88 and 58.2, respectively, and the minimum and maximum scores of Accident Proneness were 98.2 and 140.7, respectively. The maximum number of Near-miss incident rate were 408 and the minimum of that was 196. The maximum number of unsafe acts rate was 43.8 percent and the minimum of that was 27.2 percent. In nine dimensions of Safety climate the eighth dimension (personal perception of risk with the score of 4.07 has the lowest score and the fourth (laws and safety regulations dimension with 8.05 has the highest score. According to expert opinions, the most important indicator in the assessment of safety performance was unsafe acts rate, while near-miss incident rate was the least important one. Conclusion: The results of this survey reveal that using proactive (Prospective indicators could be an appropriate method in organizations safety performance evaluation.

  5. Evaluation of atmospheric dispersion/consequence models supporting safety analysis

    International Nuclear Information System (INIS)

    O'Kula, K.R.; Lazaro, M.A.; Woodard, K.

    1996-01-01

    Two DOE Working Groups have completed evaluation of accident phenomenology and consequence methodologies used to support DOE facility safety documentation. The independent evaluations each concluded that no one computer model adequately addresses all accident and atmospheric release conditions. MACCS2, MATHEW/ADPIC, TRAC RA/HA, and COSYMA are adequate for most radiological dispersion and consequence needs. ALOHA, DEGADIS, HGSYSTEM, TSCREEN, and SLAB are recommended for chemical dispersion and consequence applications. Additional work is suggested, principally in evaluation of new models, targeting certain models for continued development, training, and establishing a Web page for guidance to safety analysts

  6. Resolution of the ferrocyanide safety issue for the Hanford site high-level waste tanks

    International Nuclear Information System (INIS)

    Cash, R.J.

    1996-01-01

    This paper describes the approach used to resolve the ferrocyanide safety issue, a process that began in 1990 after heightened concern was expressed by various government agencies about the safety of Hanford site high-level waste tanks. At the time, little was known about ferrocyanide-nitrate/nitrite reactions and the potential for offsite releases of radioactivity from the Hanford Site. Recent studies have shown that the combined effects of temperature, radiation, and pH during more than 38 years of storage have destroyed most of the ferrocyanide originally added to tanks. This has been proven in the laboratory using flowsheet-derived waste simulants and confirmed by waste samples obtained from the ferrocyanide tanks. The resulting tank waste sludges are too dilute to support a sustained exothermic reaction, even if dried out and heated to temperatures of at least 250 C. The US Department of Energy (DOE) has been requested to close the ferrocyanide safety issue

  7. An Evaluation Tool for Agricultural Health and Safety Mobile Applications.

    Science.gov (United States)

    Reyes, Iris; Ellis, Tammy; Yoder, Aaron; Keifer, Matthew C

    2016-01-01

    As the use of mobile devices and their software applications, or apps, becomes ubiquitous, use amongst agricultural working populations is expanding as well. The smart device paired with a well-designed app has potential for improving workplace health and safety in the hands of those who can act upon the information provided. Many apps designed to assess workplace hazards and implementation of worker protections already exist. However, the abundance and diversity of such applications also presents challenges regarding evaluation practices and assignation of value. This is particularly true in the agricultural workspace, as there is currently little information on the value of these apps for agricultural safety and health. This project proposes a framework for developing and evaluating apps that have potential usefulness in agricultural health and safety. The evaluation framework is easily transferable, with little modification for evaluation of apps in several agriculture-specific areas.

  8. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the sediment transport modeling task

    International Nuclear Information System (INIS)

    Holt, V.L.; Baron, L.A.

    1994-05-01

    This site-specific Work Plan/Health and Safety Checklist (WP/HSC) is a supplement to the general health and safety plan (HASP) for Waste Area Grouping (WAG) 2 remedial investigation and site investigation (WAG 2 RI ampersand SI) activities [Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169)] and provides specific details and requirements for the WAG 2 RI ampersand SI Sediment Transport Modeling Task. This WP/HSC identifies specific site operations, site hazards, and any recommendations by Oak Ridge National Laboratory (ORNL) health and safety organizations [i.e., Industrial Hygiene (IH), Health Physics (HP), and/or Industrial Safety] that would contribute to the safe completion of the WAG 2 RI ampersand SI. Together, the general HASP for the WAG 2 RI ampersand SI (ORNL/ER-169) and the completed site-specific WP/HSC meet the health and safety planning requirements specified by 29 CFR 1910.120 and the ORNL Hazardous Waste Operations and Emergency Response (HAZWOPER) Program Manual. In addition to the health and safety information provided in the general HASP for the WAG 2 RI ampersand SI, details concerning the site-specific task are elaborated in this site-specific WP/HSC, and both documents, as well as all pertinent procedures referenced therein, will be reviewed by all field personnel prior to beginning operations

  9. Safety Evaluation of Osun River Water Containing Heavy Metals and ...

    African Journals Online (AJOL)

    Summary: This study evaluated the pH, heavy metals and volatile organic compounds (VOCs) in Osun river water. It also evaluated its safety in rats. Heavy metals were determined by atomic absorption spectrophotometry (AAS) while VOCs were determined by gas chromatography coupled with flame ionization detector ...

  10. Expert evaluation in NPP safety important systems licensing process

    International Nuclear Information System (INIS)

    Mikhail, A Yastrebenetsky; Vasilchenko, V.N.

    2001-01-01

    Expert evaluation of nuclear power plant safety important systems modernization is an integral part of these systems licensing process. The paper contains some aspects of this evaluation which are based on Ukrainian experience of VVER-1000 and VVER-440 modernization. (authors)

  11. Expert evaluation in NPP safety important systems licensing process

    Energy Technology Data Exchange (ETDEWEB)

    Mikhail, A Yastrebenetsky; Vasilchenko, V.N. [Ukrainian State Scientific Technical Center of Nuclear and Radiation Safety (Ukraine)

    2001-07-01

    Expert evaluation of nuclear power plant safety important systems modernization is an integral part of these systems licensing process. The paper contains some aspects of this evaluation which are based on Ukrainian experience of VVER-1000 and VVER-440 modernization. (authors)

  12. Analytic choices in road safety evaluation

    DEFF Research Database (Denmark)

    Elvik, Rune

    2012-01-01

    -of-the-art approaches. This paper explores the implications of choice of study design by examining how the findings of several evaluation studies made in Norway depend on choices made with respect to: 1. Using the empirical Bayes approach versus using simpler approaches; 2. Use or non-use of a comparison group; 3...

  13. FLIGHT SAFETY MANAGEMENT PROBLEMS AND EVALUATION OF FLIGHT SAFETY LEVEL OF AN AVIATION ENTERPRISE

    OpenAIRE

    B. V. Zubkov; H. E. Fourar

    2017-01-01

    This article is devoted to studying the problem of safety management system (SMS) and evaluating safety level of an aviation enterprise.This article discusses the problems of SMS, presented at the 41st meeting of the Russian Aviation Production Commanders Club in June 2014 in St. Petersburg in connection with the verification of the status of the CA of the Russian Federation by the International Civil Aviation Organization (ICAO) in the same year, a set of urgent measures to eliminate the def...

  14. Investigating the Safety Culture and Costs Arising from Safety Non-Compliance on Building Sites

    Directory of Open Access Journals (Sweden)

    Amir Ahmad Hedayat

    2017-02-01

    Full Text Available In addition to the positive effects of industrial development and technological progress, it also has adverse side effects such as increasing the quantity and quality of working and living environment pollution. Work-related accidents and occupational diseases are the consequences of the development of industry and technology and they increasingly threaten human life, especially the staff. Work-related Accidents are accidents that occur in the line of duty in the workplace and lead to fatal or non-fatal injuries. Although many activities have been done to reduce work-related, or in other words occupational accidents, the accident statistics is still high, in a way that The World Health Organization considered that as an epidemic in the area of public health, and considered that as a critical risk factor for health, economic and social issues. This paper deals with safety culture, costs arising from accidents and how to cope with the work-related accidents.

  15. Investigating the potential benefits of on-site food safety training for Folklorama, a temporary food service event.

    Science.gov (United States)

    Mancini, Roberto; Murray, Leigh; Chapman, Benjamin J; Powell, Douglas A

    2012-10-01

    Folklorama in Winnipeg, Manitoba, Canada, is a 14-day temporary food service event that explores the many different cultural realms of food, food preparation, and entertainment. In 2010, the Russian pavilion at Folklorama was implicated in a foodborne outbreak of Escherichia coli O157 that caused 37 illnesses and 18 hospitalizations. The ethnic nature and diversity of foods prepared within each pavilion presents a unique problem for food inspectors, as each culture prepares food in their own very unique way. The Manitoba Department of Health and Folklorama Board of Directors realized a need to implement a food safety information delivery program that would be more effective than a 2-h food safety course delivered via PowerPoint slides. The food operators and event coordinators of five randomly chosen pavilions selling potentially hazardous food were trained on-site, in their work environment, focusing on critical control points specific to their menu. A control group (five pavilions) did not receive on-site food safety training and were assessed concurrently. Public health inspections for all 10 pavilions were performed by Certified Public Health Inspectors employed with Manitoba Health. Critical infractions were assessed by means of standardized food protection inspection reports. The results suggest no statistically significant difference in food inspection scores between the trained and control groups. However, it was found that inspection report results increased for both the control and trained groups from the first inspection to the second, implying that public health inspections are necessary in correcting unsafe food safety practices. The results further show that in this case, the 2-h food safety course delivered via slides was sufficient to pass public health inspections. Further evaluations of alternative food safety training approaches are warranted.

  16. Economic evaluation in patient safety: a literature review of methods.

    Science.gov (United States)

    de Rezende, Bruna Alves; Or, Zeynep; Com-Ruelle, Laure; Michel, Philippe

    2012-06-01

    Patient safety practices, targeting organisational changes for improving patient safety, are implemented worldwide but their costs are rarely evaluated. This paper provides a review of the methods used in economic evaluation of such practices. International medical and economics databases were searched for peer-reviewed publications on economic evaluations of patient safety between 2000 and 2010 in English and French. This was complemented by a manual search of the reference lists of relevant papers. Grey literature was excluded. Studies were described using a standardised template and assessed independently by two researchers according to six quality criteria. 33 articles were reviewed that were representative of different patient safety domains, data types and evaluation methods. 18 estimated the economic burden of adverse events, 3 measured the costs of patient safety practices and 12 provided complete economic evaluations. Healthcare-associated infections were the most common subject of evaluation, followed by medication-related errors and all types of adverse events. Of these, 10 were selected that had adequately fulfilled one or several key quality criteria for illustration. This review shows that full cost-benefit/utility evaluations are rarely completed as they are resource intensive and often require unavailable data; some overcome these difficulties by performing stochastic modelling and by using secondary sources. Low methodological transparency can be a problem for building evidence from available economic evaluations. Investing in the economic design and reporting of studies with more emphasis on defining study perspectives, data collection and methodological choices could be helpful for strengthening our knowledge base on practices for improving patient safety.

  17. [Comics for traffic education: evaluation of a traffic safety campaign].

    Science.gov (United States)

    Bonfadelli, H

    1989-01-01

    Traffic safety campaigns often are ineffective to change driving behavior because they don't reach the target group or are recognized only by people who are already interested or concerned. The evaluation of a traffic safety campaign called "Leo Lässig", addressed to young new drivers, shows that recognition and acceptance by the target group were stimulated by the age-conform means of comic-strips.

  18. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application

    International Nuclear Information System (INIS)

    1993-01-01

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation

  19. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-24

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation.

  20. Savannah River Site management response plan for chemical safety vulnerability field assessment. Revision 1

    International Nuclear Information System (INIS)

    Kahal, E.J.; Murphy, S.L.; Salaymeh, S.R.

    1994-09-01

    As part of the U.S. Department of Energy's (DOE) initiative to identify potential chemical safety vulnerabilities in the DOE complex, the Chemical Safety Vulnerability Core Working Group issued a field verification assessment report. While the report concluded that Savannah River Site (SRS) is moving in a positive direction, the report also identified five chemical safety vulnerabilities with broad programmatic impact that are not easily nor quickly remedied. The May 1994 SRS Management Response Plan addressed the five SRS vulnerabilities identified in the field assessment report. The SRS response plan listed observations supporting the vulnerabilities and any actions taken or planned toward resolution. Many of the observations were resolved by simple explanations, such as the existence of implementation plans for Safety Analysis Report updates. Recognizing that correcting individual observations does not suffice in remedying the vulnerabilities, a task team was assembled to address the broader programmatic issues and to recommend corrective actions

  1. Comparison of APR1400 safety between brake site and shin-Kori site Due to the difference in the climate conditions

    International Nuclear Information System (INIS)

    Yoon, Ho Joon; Lee, Jeong Ik; Lee, Jeong Ik

    2012-01-01

    Brake Nuclear Power Plant (BNPP) is now under the construction based on APR1400 designed by Korean Electric Power Corporation (KEPCO). APR1400 is a two loop pressurized water reactor, the nuclear steam supply system (NSSS) US designed for about put of 4,000 MWt, with a corresponding electrical output of approximately 1,390 MWe. The first APR1400 (SKN 3 and 4) constructed in Shin-Kori, Korea has been modified according to the surrounding environment of the United Arab Emirates. In this paper, authors would like to compare safety issues between B NPP and Skin due to the changes of surroundings, since the site characteristics are very different. For instance, the mean annual air temperature in the UAE is 28 .deg. C and the peak air temperature was recorded as 48.8 .deg. C. Sea temperatures are varying from 17. deg. C in January to 35. deg. C in August, while that of Korea is in 9-16. deg. C range. Hot climate of UAE and the malfunction of HVAC system can lead the increasing of the water temperature in safety injection system (SIS). The heated water in SIS may affect the safety margin of the peak cladding temperature (PCT). The change of PCT and response time according to design basis accident scenarios such as large break LOCA are analyzed in detail. To evaluate such effect, Mars code was utilized to evaluate assumed condition by KAIST and the analyses of the results were carried out by Khalifa Univ.

  2. Remedial actions of nuclear safety shot sites: Double Tracks and Clean Slates

    International Nuclear Information System (INIS)

    Sanchez, M.; Shotton, M.; Lyons, C.

    1998-03-01

    Remedial actions of plutonium (Pu)-contaminated soils are in the preliminary stages of development at the Nevada Test Site (NTS). Interim clean-up actions were completed at the Double Tracks and Clean Slate 1 safety shot sites in 1996 and 1997, respectively. Soil at both sites, with a total transuranic activity greater than 20 picoCuries per gram (pCi/g), was excavated and shipped to the NTS for disposal. Characterization and assessment efforts were initiated at the Double Tracks site in 1995, and the clean-up of this site as an interim action was completed in 1996. Clean-up of this site consisted of taking site-specific data and applying rationale for dose and risk calculations in selecting parameter values for the interim corrective action level. The remediation process included excavating and stockpiling the contaminated soil and loading the soil into supersacks with approximately 1,513 cubic meters (53,500 cubic feet) being shipped to the NTS for disposal. In 1997, remediation began on the Clean Slate 1 site on which characterization had already been completed using a very similar approach; however, the site incorporated lessons learned, cost efficiencies, and significant improvements to the process. This paper focuses on those factors and the progress that has been made in cleaning up the sites. The application of a technically reasonable remediation method, as well as the cost factors that supported transport and disposal of the low-level waste in bulk are discussed

  3. Criteria for the siting, construction, management and evaluation of low and intermediate activity radioactive waste stores

    International Nuclear Information System (INIS)

    Granero, J.J.

    1986-01-01

    The experience acquired by Spain for the storage of low and intermediate level radioactive wastes, is presented. General considerations related to the technology, financing, administrative measures and risk determination are done. The criteria of site selection for construction and management of the waste storage facility are described, evaluating the specific criteria for the licensing procedure, and taking in account the safety and the radiation protection during periods of the system operation. (M.C.K.) [pt

  4. Preliminary safety evaluation for 241-C-106 waste retrieval, project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1994-01-01

    This document presents the Preliminary Safety Evaluation for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). The US DOE has been mandated to develop plans for response to safety issues associated with the waste storage tanks at the Hanford Site, and to report the progress of implementing those plans to Congress. The objectives of Project W-230 are to design, fabricate, develop, test, and operate a new retrieval system capable of removing a minimum of about 75% of the high-heat waste contained in C-106. It is anticipated that sluicing operations can remove enough waste to reduce the remaining radiogenic heat load to levels low enough to resolve the high-heat safety issue as well as allow closure of the tank safety issue

  5. Site safety progress review of spent fuel central interim storage facility. Final report

    International Nuclear Information System (INIS)

    Gurpinar, A.; Serva, L.; Giuliani

    1995-01-01

    Following the request of the Czech Power Board (CEZ) and within the scope of the Technical Cooperation Project CZR/9/003, a progress review of the site safety of the Spent Fuel Central Interim Storage Facility (SFCISF) was performed. The review involved the first two stages of the works comprising the regional survey and identification of candidate sites for the underground and surface storage options. Five sites have been identified as a result of the previous works. The following two stages will involved the identification of the preferred candidate sites for the two options and the final site qualification. The present review had the purpose of assessing the work already performed and making recommendations for the next two stages of works

  6. Information report on nuclear safety and radiation protection of the Tricastin AREVA site - Issue 2012

    International Nuclear Information System (INIS)

    2013-06-01

    Published in compliance with the French code of the environment, this report first presents different aspects of the Areva's Tricastin site which comprises five basic nuclear installations or INBs, and seven ICPE (installation classified for the protection of the environment). The activities are dedicated to uranium conversion, uranium enrichment, uranium chemistry, industrial services, and fuel manufacturing. The report presents this important industrial site, describes the various measures regarding nuclear safety and radiation protection, reports nuclear events which occurred on this site and had to be declared, reports the management of releases by this site and the control of the environment. The next part addresses the management of the various wastes produced by the different installations present on this site. The management of other impacts is also reported. The last chapter reviews the actions undertaken in the field of transparency and information

  7. Restaurant supervisor safety training: evaluating a small business training intervention.

    Science.gov (United States)

    Bush, Diane; Paleo, Lyn; Baker, Robin; Dewey, Robin; Toktogonova, Nurgul; Cornelio, Deogracia

    2009-01-01

    We developed and assessed a program designed to help small business owners/managers conduct short training sessions with their employees, involve employees in identifying and addressing workplace hazards, and make workplace changes (including physical and work practice changes) to improve workplace safety. During 2006, in partnership with a major workers' compensation insurance carrier and a restaurant trade association, university-based trainers conducted workshops for more than 200 restaurant and food service owners/managers. Workshop participants completed posttests to assess their knowledge, attitudes, and intentions to implement health and safety changes. On-site follow-up interviews with 10 participants were conducted three to six months after the training to assess the extent to which program components were used and worksite changes were made. Post-training assessments demonstrated that attendees increased their understanding and commitment to health and safety, and felt prepared to provide health and safety training to their employees. Follow-up interviews indicated that participants incorporated core program concepts into their training and supervision practices. Participants conducted training, discussed workplace hazards and solutions with employees, and made changes in the workplace and work practices to improve workers' health and safety. This program demonstrated that owners of small businesses can adopt a philosophy of employee involvement in their health and safety programs if provided with simple, easy-to-use materials and a training demonstration. Attending a workshop where they can interact with other owners/ managers of small restaurants was also a key to the program's success.

  8. Rock siting of nuclear power plants from a reactor safety standpoint

    International Nuclear Information System (INIS)

    1975-11-01

    The study has aimed at surveying the advantages and disadvantages of a rock sited nuclear power plant from a reactor safety standpoint. The studies performed are almost entirely concentrated on the BWR alternative. The design of a nuclear power plant in rock judged most appropriate has been studied in greater detail, and a relatively extensive safety analysis has been made. It is found that the presented technical design of the rock sited alternative is sufficiently advanced to form a basis for further projecting treatment. The chosen technical design of the reactor plant demands a cavern with a 45-50 metre span. Caverns without strengthening efforts with such spans are used in mines, but have no previously been used for industrial plants. Studies of the stability of such caverns show that a safety level is attainable corresponding to the safety required for the other parts of the nuclear power plant. The conditions are that the rock is of high quality, that necessary strengthening measures are taken and that careful studies of the rock are made before and during the blasting, and also during operation of the plant. When locating a rock sited nuclear power plant, the same criteria must be considered as for an above ground plant, with additional stronger demands for rock quality. The presented rock sited nuclear power plant has been assessed to cost 20 % more in total construction costs than a corresponding above ground plant. The motivations for rock siting also depend on whether a condensing plant for only electricity production, or a plant for combined power production and district heating, is considered. The latter would under certain circumstances make rock siting look more attractive. (author)

  9. Safety indicators as a tool for operational safety evaluation of nuclear power plants

    International Nuclear Information System (INIS)

    Araujo, Jefferson Borges; Melo, Paulo Fernando Ferreira Frutuoso e; Schirru, Roberto

    2009-01-01

    Performance indicators have found a wide use in the conventional and nuclear industries. For the conventional industry, the goal is to optimize production, reducing loss of time with accidents, human error and equipment downtimes. In the nuclear industry, nuclear safety is an additional goal. This paper presents a general methodology to the establishment, selection and use of safety indicators for a two loop PWR plant, as Angra 1. The use of performance indicators is not new. The NRC has its own methodology and the IAEA presents methodology suggestions, but there is no detailed documentation about indicators selection, criteria and bases used. Additionally, only the NRC methodology performs a limited integrated evaluation. The study performed identifies areas considered critical for the plant operational safety. For each of these areas, strategic sub-areas are defined. For each strategic sub-area, specific safety indicators are defined. These proposed Safety Indicators are based on the contribution to risk considering a quantitative risk analysis. For each safety indicator, a goal, a bounded interval and proper bases are developed, to allow for a clear and comprehensive individual behavior evaluation. On the establishment of the intervals and boundaries, a probabilistic safety study, operational experience, international and national standards and technical specifications were used. Additionally, an integrated evaluation of the indicators, using expert systems, was done to obtain an overview of the plant general safety. This evaluation uses well-defined and clear rules and weights for each indicator to be considered. These rules were implemented by means of a computational language, on a friendly interface, so that it is possible to obtain a quick response about operational safety. This methodology can be used to identify situations where the plant safety is challenged, by giving a general overview of the plant operational condition. Additionally, this study can

  10. The safety evaluation guide for laboratories and plants a tool for enhancing safety

    International Nuclear Information System (INIS)

    Lhomme, Veronique; Daubard, Jean-Paul

    2013-01-01

    of safety file (safety options file, general operating rules, on site emergency plan, periodic safety review documents, incident analysis...). In each chapter, the aforesaid Parts 1, 2 and 3 are developed. A first draft of the guide was published in March 2010 for use by assessment's teams of IRSN, and to obtain an operational feedback to improve it. Beyond that, the guide is also intended to be, on the topic of safety assessment for the fuel cycle facilities, laboratories, irradiators, particle accelerators, under-decommissioning reactors and radioactive waste management, a tool for tutoring (inside and outside the IRSN) and a reference to make available, outside of the IRSN, the approach of expertise and the 'know-how' of IRSN. In this context, the IRSN's methodology of assessment regarding 'criticality' and 'fire' have been put online, on the IRSN's web site. The paper presents the purpose and the structure of the guide and its interest for the safety assessment of fuel cycle facilities; in this frame, the chapters 'Assessment of the risk from handling operations' and 'Assessment of the periodic safety review documents' are presented in details as illustrations. It gives also information about its others uses. (authors)

  11. Reactor safety; Description and evaluation of safety activities in Nordic countries

    International Nuclear Information System (INIS)

    Wahlstroem, B.; Gunsell, L.

    1998-03-01

    The report gives a description of safety activities in the nuclear power industry. The study has been carried out as a part of the four year programme in Nordic Safety Research (NKS) which was completed in 1997. The objective of the NKS/RAK-1.1 project 'A survey and an evaluation of safety activities in nuclear power' was to make a broad description of various activities important for safety and to make an assessment of their efficiency. A special consideration was placed on a comparison of practices in Finland and Sweden, and between their nuclear utilities. The study has been divided into two parts, one theoretical part in which a model of the relationships between various activities important for safety has been constructed and one practical part where a total of 62 persons have been interviewed at the authorities, the nuclear utilities and one reactor vendor. To restrict the amount of work two activities, safety analysis and experience feedback, were selected. A few cases connected to incidents at nuclear power plants were discussed in more detail. The report has been structured around a simple model of nuclear safety consisting of the concepts of goals, means and outcomes. This model illustrates the importance of goal formulation, systematic planning and feedback of operational experience as major components in nuclear safety. In assessing organisation and management at authorities and the power utilities there is a clear trend of decentralisation and delegation of authority. The general impression from the study is that the safety activities in Finland and Sweden are efficient and well targeted. The experience from the methodology is favourable and the comparison of practices gives a good ground for a discussion of contents and targeting of safety activities. (EG) activities. (EG)

  12. A quantitative approach to safety evaluation

    International Nuclear Information System (INIS)

    Kuz'min, I.I.; Romanov, S.V.; Chernoplekov, A.N.; Babaev, N.S.

    1984-01-01

    The paper evaluates the hazards associated with an increase in the CO 2 concentration of the atmosphere and an accompanying rise in average annual temperature at ground level. For the calculations, a global model developed in 1971 by D. Forrestor, which takes ecological factors into account, was used. The main hazards associated with an increase in temperature at ground level as a result of an increase in the CO 2 concentration are possible agricultural losses in the form of smaller harvests. This type of hazard is evaluated in the paper by means of the global development model. Two alternatives were considered: in the first, losses are assumed to be offset by additional capital investment in agriculture, while in the second the same money is spent on reducing CO 2 releases. It is shown that a diversion of funds to the construction of purification systems might lead to a crisis as a result of reduced standards of living and a corresponding rise in mortality. In the paper it is assumed that a reduction in the coefficient of mortality can be taken as a criterion of safe development. (author)

  13. Aging evaluation methodology of periodic safety review in Korea

    International Nuclear Information System (INIS)

    Park, Heung-Bae; Jung, Sung-Gyu; Jin, Tae-Eun; Jeong, Ill-Seok

    2002-01-01

    In Korea plant lifetime management (PLIM) study for Kori Unit 1 has been performed since 1993. Meanwhile, periodic safety review (PSR) for all operating nuclear power plants (NPPs) has been started with Kori Unit 1 since 2000 per IAEA recommendation. The evaluation period is 10 years, and safety (evaluation) factors are 11 per IAEA guidelines as represented in table 1. The relationship between PSR factors and PLIM is also represented. Among these factors evaluation of 'management of aging' is one of the most important and difficult factor. This factor is related to 'actual condition of the NPP', 'use of experience from other nuclear NPPs and of research findings', and 'management of aging'. The object of 'management of aging' is to obtain plant safety through identifying actual condition of system, structure and components (SSCs) and evaluating aging phenomena and residual life of SSCs using operating experience and research findings. The paper describes the scope and procedure of valuation of 'management of aging', such as, screening criteria of SSCs, Code and Standards, evaluation of SSCs and safety issues as represented. Evaluating SSCs are determined using final safety analysis report (FSAR) and power unit maintenance system for Nuclear Ver. III (PUMAS/N-III). The screening criteria of SSCs are safety-related items (quality class Q), safety-impact items (quality class T), backfitting rule items (fire protection (10CFR50.48), environmental qualification (10CFR50.49), pressurized thermal shock (10CFR50.61), anticipated transient without scram (10CFR50.62), and station blackout (10CFR50.63)) and regulating authority requiring items[1∼3]. The purpose of review of Code and Standards is identifying actual condition of the NPP and evaluating aging management using effective Code and Standards corresponding to reactor facilities. Code and Standards is composed of regulating laws, FSAR items, administrative actions, regulating actions, agreement items, and other

  14. The International Criticality Safety Benchmark Evaluation Project (ICSBEP)

    International Nuclear Information System (INIS)

    Briggs, J.B.

    2003-01-01

    The International Criticality Safety Benchmark Evaluation Project (ICSBEP) was initiated in 1992 by the United States Department of Energy. The ICSBEP became an official activity of the Organisation for Economic Cooperation and Development (OECD) - Nuclear Energy Agency (NEA) in 1995. Representatives from the United States, United Kingdom, France, Japan, the Russian Federation, Hungary, Republic of Korea, Slovenia, Yugoslavia, Kazakhstan, Israel, Spain, and Brazil are now participating. The purpose of the ICSBEP is to identify, evaluate, verify, and formally document a comprehensive and internationally peer-reviewed set of criticality safety benchmark data. The work of the ICSBEP is published as an OECD handbook entitled 'International Handbook of Evaluated Criticality Safety Benchmark Experiments.' The 2003 Edition of the Handbook contains benchmark model specifications for 3070 critical or subcritical configurations that are intended for validating computer codes that calculate effective neutron multiplication and for testing basic nuclear data. (author)

  15. International Criticality Safety Benchmark Evaluation Project (ICSBEP) - ICSBEP 2015 Handbook

    International Nuclear Information System (INIS)

    Bess, John D.

    2015-01-01

    The Criticality Safety Benchmark Evaluation Project (CSBEP) was initiated in October of 1992 by the United States Department of Energy (DOE). The project quickly became an international effort as scientists from other interested countries became involved. The International Criticality Safety Benchmark Evaluation Project (ICSBEP) became an official activity of the Nuclear Energy Agency (NEA) in 1995. This handbook contains criticality safety benchmark specifications that have been derived from experiments performed at various critical facilities around the world. The benchmark specifications are intended for use by criticality safety engineers to validate calculation techniques used to establish minimum subcritical margins for operations with fissile material and to determine criticality alarm requirements and placement. Many of the specifications are also useful for nuclear data testing. Example calculations are presented; however, these calculations do not constitute a validation of the codes or cross-section data. The evaluated criticality safety benchmark data are given in nine volumes. These volumes span approximately 69000 pages and contain 567 evaluations with benchmark specifications for 4874 critical, near-critical or subcritical configurations, 31 criticality alarm placement/shielding configurations with multiple dose points for each, and 207 configurations that have been categorised as fundamental physics measurements that are relevant to criticality safety applications. New to the handbook are benchmark specifications for neutron activation foil and thermoluminescent dosimeter measurements performed at the SILENE critical assembly in Valduc, France as part of a joint venture in 2010 between the US DOE and the French Alternative Energies and Atomic Energy Commission (CEA). A photograph of this experiment is shown on the front cover. Experiments that are found unacceptable for use as criticality safety benchmark experiments are discussed in these

  16. The site of a nuclear power plant and environmental safety; Ydinvoimalaitoksen sijaintipaikka ja ympaeristoen turvallisuus

    Energy Technology Data Exchange (ETDEWEB)

    Rossi, J. [VTT Energy, Espoo (Finland)

    2001-11-01

    The purpose of this report is to give the reader a general view of the things associated with the site of a nuclear power plant. In this context the effect of a nuclear power plant and site on environmental safety is considered. Planning, construction and operating a nuclear power plant require several judgements and licenses based on different laws. The location of the planned nuclear facility project and environmental conditions contribute in great detail to the compliance arguments of permits. At first the environmental impacts of the siting project and its alternatives shall be investigated in the Environmental Impact Assessment procedure. Then the decision in principle according to the Nuclear Energy Act can be applied from the Council of State, the decision shall further be confirmed by Parliament. When the decision in principle is considered the overall good of society shall be assessed by means of considering i.a. site alternatives and safety. The safety related basic principle is that operation of a nuclear power plant may not cause danger to the environment, public or property. After the affirmative principle approval the construction license and later on the operation license can be applied from the Council of State, these licenses need to be supported i.a. by building and environmental licenses of separate authorities. Also some international contracts concern realisation of a nuclear power plant siting. The nuclear power plant site shall be suitable for the needs of the electricity production and the transmission system and it shall be technically appropriate for building and operation of a power plant. The site shall be safe enough on the other hand from the view of external events threatening the power plant - although one can be partly prepared for these things in the design of the plant - and on the other hand from the point of public safety. Requirements for the safety of the site are directed in the decision of the Council of State's general

  17. RECOMMENDED TRITIUM OXIDE DEPOSITION VELOCITY FOR USE IN SAVANNAH RIVER SITE SAFETY ANALYSES

    Energy Technology Data Exchange (ETDEWEB)

    Lee, P.; Murphy, C.; Viner, B.; Hunter, C.; Jannik, T.

    2012-04-03

    The Defense Nuclear Facilities Safety Board (DNFSB) has recently questioned the appropriate value for tritium deposition velocity used in the MELCOR Accident Consequence Code System Ver. 2 (Chanin and Young 1998) code when estimating bounding dose (95th percentile) for safety analysis (DNFSB 2011). The purpose of this paper is to provide appropriate, defensible values of the tritium deposition velocity for use in Savannah River Site (SRS) safety analyses. To accomplish this, consideration must be given to the re-emission of tritium after deposition. Approximately 85% of the surface area of the SRS is forested. The majority of the forests are pine plantations, 68%. The remaining forest area is 6% mixed pine and hardwood and 26% swamp hardwood. Most of the path from potential release points to the site boundary is through forested land. A search of published studies indicate daylight, tritiated water (HTO) vapor deposition velocities in forest vegetation can range from 0.07 to 2.8 cm/s. Analysis of the results of studies done on an SRS pine plantation and climatological data from the SRS meteorological network indicate that the average deposition velocity during daylight periods is around 0.42 cm/s. The minimum deposition velocity was determined to be about 0.1 cm/s, which is the recommended bounding value. Deposition velocity and residence time (half-life) of HTO in vegetation are related by the leaf area and leaf water volume in the forest. For the characteristics of the pine plantation at SRS the residence time corresponding to the average, daylight deposition velocity is 0.4 hours. The residence time corresponding to the night-time deposition velocity of 0.1 cm/s is around 2 hours. A simple dispersion model which accounts for deposition and re-emission of HTO vapor was used to evaluate the impact on exposure to the maximally exposed offsite individual (MOI) at the SRS boundary (Viner 2012). Under conditions that produce the bounding, 95th percentile MOI exposure

  18. Gas-cooled reactor technology safety and siting. Report of a technical committee meeting. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-07-01

    ; the generally favorable review of the unique safety aspects of the US MHTGR design by the US. Nuclear Regulatory Commission (NRC) in their draft Safety Evaluation Report; the increasing interest by gradually more and more industrializing countries and even a few new industrialized countries in incorporating MRTGRs into their plans for expanded electricity production and for enhanced oil recovery and district heating. Most of the papers provided an expansion of views or details of the development work supporting the national programs or perspectives outlined during the preceding International Conference. Apparent throughout was the gradually increasing effort taking place in the world to support the modular HTGR and the recognition that the demonstration of its unique characteristics is the logical next step in commercialization of the concept. The view expressed by industrializing countries in terms of application studies, siting and licensing aspects and by industrialized countries in terms of design and development progress, project prospects, cost analyses and long range technological growth potential into higher temperature industrial applications provided substantial evidence to this increasing recognition.

  19. Gas-cooled reactor technology safety and siting. Report of a technical committee meeting. Working material

    International Nuclear Information System (INIS)

    1990-01-01

    ; the generally favorable review of the unique safety aspects of the US MHTGR design by the US. Nuclear Regulatory Commission (NRC) in their draft Safety Evaluation Report; the increasing interest by gradually more and more industrializing countries and even a few new industrialized countries in incorporating MRTGRs into their plans for expanded electricity production and for enhanced oil recovery and district heating. Most of the papers provided an expansion of views or details of the development work supporting the national programs or perspectives outlined during the preceding International Conference. Apparent throughout was the gradually increasing effort taking place in the world to support the modular HTGR and the recognition that the demonstration of its unique characteristics is the logical next step in commercialization of the concept. The view expressed by industrializing countries in terms of application studies, siting and licensing aspects and by industrialized countries in terms of design and development progress, project prospects, cost analyses and long range technological growth potential into higher temperature industrial applications provided substantial evidence to this increasing recognition

  20. Developing a Hierarchical Decision Model to Evaluate Nuclear Power Plant Alternative Siting Technologies

    Science.gov (United States)

    Lingga, Marwan Mossa

    A strong trend of returning to nuclear power is evident in different places in the world. Forty-five countries are planning to add nuclear power to their grids and more than 66 nuclear power plants are under construction. Nuclear power plants that generate electricity and steam need to improve safety to become more acceptable to governments and the public. One novel practical solution to increase nuclear power plants' safety factor is to build them away from urban areas, such as offshore or underground. To date, Land-Based siting is the dominant option for siting all commercial operational nuclear power plants. However, the literature reveals several options for building nuclear power plants in safer sitings than Land-Based sitings. The alternatives are several and each has advantages and disadvantages, and it is difficult to distinguish among them and choose the best for a specific project. In this research, we recall the old idea of using the alternatives of offshore and underground sitings for new nuclear power plants and propose a tool to help in choosing the best siting technology. This research involved the development of a decision model for evaluating several potential nuclear power plant siting technologies, both those that are currently available and future ones. The decision model was developed based on the Hierarchical Decision Modeling (HDM) methodology. The model considers five major dimensions, social, technical, economic, environmental, and political (STEEP), and their related criteria and sub-criteria. The model was designed and developed by the author, and its elements' validation and evaluation were done by a large number of experts in the field of nuclear energy. The decision model was applied in evaluating five potential siting technologies and ranked the Natural Island as the best in comparison to Land-Based, Floating Plant, Artificial Island, and Semi-Embedded plant.

  1. FFTF railroad tank car Safety Evaluation for Packaging

    International Nuclear Information System (INIS)

    Carlstrom, R.F.

    1995-01-01

    This Safety Evaluation for Packaging (SEP) provides evaluations considered necessary to approve transfer of the 8,000 gallon Liquid Waste Tank Car (LWTC) from Fast Flux Test Facility (FFTF) to the 200 Areas. This SEP will demonstrate that the transfer of the LWTC will provide an equivalent degree of safety as would be provided by packages meeting U.S. Department of Transportation (DOT) requirements. This fulfills onsite transportation requirements implemented in the Hazardous Material Packaging and Shipping, WHC-CM-2-14

  2. Safety analysis and evaluation methodology for fusion systems

    International Nuclear Information System (INIS)

    Fujii-e, Y.; Kozawa, Y.; Namba, C.

    1987-03-01

    Fusion systems which are under development as future energy systems have reached a stage that the break even is expected to be realized in the near future. It is desirable to demonstrate that fusion systems are well acceptable to the societal environment. There are three crucial viewpoints to measure the acceptability, that is, technological feasibility, economy and safety. These three points have close interrelation. The safety problem is more important since three large scale tokamaks, JET, TFTR and JT-60, start experiment, and tritium will be introduced into some of them as the fusion fuel. It is desirable to establish a methodology to resolve the safety-related issues in harmony with the technological evolution. The promising fusion system toward reactors is not yet settled. This study has the objective to develop and adequate methodology which promotes the safety design of general fusion systems and to present a basis for proposing the R and D themes and establishing the data base. A framework of the methodology, the understanding and modeling of fusion systems, the principle of ensuring safety, the safety analysis based on the function and the application of the methodology are discussed. As the result of this study, the methodology for the safety analysis and evaluation of fusion systems was developed. New idea and approach were presented in the course of the methodology development. (Kako, I.)

  3. Criticality safety evaluations - a open-quotes stalking horseclose quotes for integrated safety assessment

    International Nuclear Information System (INIS)

    Williams, R.A.

    1995-01-01

    The Columbia Fuel Fabrication Facility of the Westinghouse Commercial Nuclear Fuel Division manufactures low-enriched uranium fuel and associated components for use in commercial pressurized water power reactors. To support development of a comprehensive integrated safety assessment (ISA) for the facility, as well as to address increasing U.S. Nuclear Regulatory Commission (NRC) expectations regarding such a facility's criticality safety assessments, a project is under way to complete criticality safety evaluations (CSEs) of all plant systems used in processing nuclear materials. Each CSE is made up of seven sections, prepared by a multidisciplinary team of process engineers, systems engineers, safety engineers, maintenance representatives, and operators. This paper provides a cursory outline of the type of information presented in a CSE

  4. Criticality safety evaluations - a {open_quotes}stalking horse{close_quotes} for integrated safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Williams, R.A. [Westinghouse Electric Corp., Columbia, SC (United States)

    1995-12-31

    The Columbia Fuel Fabrication Facility of the Westinghouse Commercial Nuclear Fuel Division manufactures low-enriched uranium fuel and associated components for use in commercial pressurized water power reactors. To support development of a comprehensive integrated safety assessment (ISA) for the facility, as well as to address increasing U.S. Nuclear Regulatory Commission (NRC) expectations regarding such a facility`s criticality safety assessments, a project is under way to complete criticality safety evaluations (CSEs) of all plant systems used in processing nuclear materials. Each CSE is made up of seven sections, prepared by a multidisciplinary team of process engineers, systems engineers, safety engineers, maintenance representatives, and operators. This paper provides a cursory outline of the type of information presented in a CSE.

  5. Effectiveness evaluation of alternative fixed-site safeguard security systems

    International Nuclear Information System (INIS)

    Chapman, L.D.

    1976-01-01

    An evaluation of a fixed-site physical protection system must consider the interrelationships of barriers, alarms, on-site and off-site guards, and their effectiveness against a forcible adversary attack intent on creating an act of sabotage of theft. A computer model, Forcible Entry Safeguard Effectiveness Model (FESEM), was developed for the evaluation of alternative fixed-site protection systems. It was written in the GASP IV simulation language. A hypothetical fixed-state protection system is defined and relative evaluations from a cost-effectiveness point of view are presented in order to demonstrate how the model can be used. Trade-offs involving on-site and off-site response forces and response times, perimeter system alarms, barrier configurations, and varying levels of threat are analyzed. The computer model provides a framework for performing inexpensive experiments on fixed-site security systems, for testing alternative decisions, and for determining the relative cost effectiveness associated with these decision policies

  6. Criticality safety engineering at the Savannah River Site - the 1990s

    International Nuclear Information System (INIS)

    Chandler, J.R.; Apperson, C.E. Jr.

    1996-01-01

    The privatization and downsizing effort that is ongoing within the U.S. Department of Energy (DOE) is requiring a change in the management of criticality safety engineering resources at the Savannah River Site (SRS). Downsizing affects the number of criticality engineers employed by the prime contractor, Westinghouse Savannah River Company (WSRC), and privatization affects the manner in which business is conducted. In the past, criticality engineers at the SRS have been part of the engineering organizations that support each facility handling fissile material. This practice led to different criticality safety engineering organizations dedicated to fuel fabrication activities, reactor loading and unloading activities, separation and waste management operations, and research and development

  7. A bicycle safety index for evaluating urban street facilities.

    Science.gov (United States)

    Asadi-Shekari, Zohreh; Moeinaddini, Mehdi; Zaly Shah, Muhammad

    2015-01-01

    The objectives of this research are to conceptualize the Bicycle Safety Index (BSI) that considers all parts of the street and to propose a universal guideline with microscale details. A point system method comparing existing safety facilities to a defined standard is proposed to estimate the BSI. Two streets in Singapore and Malaysia are chosen to examine this model. The majority of previous measurements to evaluate street conditions for cyclists usually cannot cover all parts of streets, including segments and intersections. Previous models also did not consider all safety indicators and cycling facilities at a microlevel in particular. This study introduces a new concept of a practical BSI to complete previous studies using its practical, easy-to-follow, point system-based outputs. This practical model can be used in different urban settings to estimate the level of safety for cycling and suggest some improvements based on the standards.

  8. Safety Assessment Document for the Spent Reactor Fuel Geologic Storage Test in the Climax Granite Stock at the Nevada Test site

    International Nuclear Information System (INIS)

    1980-01-01

    The objective of the Spent Fuel Geologic Storage Test in the Climax Granite Stock is to evaluate the response of a granitic rock mass to the underground storage of encapsulated spent reactor fuel in a geometry that simulates a module of a large-scale geologic repository. This document reports an assessment of the safety of conducting this test. Descriptions are provided of the geography, meteorology, hydrology, geology, and seismology of the Climax Site; the effects of postulated natural phenomena and other activities at the nevada Test Site on the safety of the test; and the design and operation of the test facility and associated equipment. Evaluations are made of both the radiological and nonradiological impacts of normal operations, abnormal operations, and postulated accidents. It is concluded that conduct of the spent fuel test at the Climax Site will not result in any undue risk to the public, property, environment, or site employees

  9. US Department of Energy DOE Nevada Operations Office, Nevada Test Site: Underground safety and health standards

    International Nuclear Information System (INIS)

    1993-05-01

    The Nevada Test Site Underground Safety and Health Standards Working Group was formed at the direction of John D. Stewart, Director, Nevada Test Site Office in April, 1990. The objective of the Working Group was to compile a safety and health standard from the California Tunnel Safety Orders and OSHA for the underground operations at the NTS, (excluding Yucca Mountain). These standards are called the NTS U/G Safety and Health Standards. The Working Group submits these standards as a RECOMMENDATION to the Director, NTSO. Although the Working Group considers these standards to be the most integrated and comprehensive standards that could be developed for NTS Underground Operations, the intent is not to supersede or replace any relevant DOE orders. Rather the intent is to collate the multiple safety and health references contained in DOE Order 5480.4 that have applicability to NTS Underground Operations into a single safety and heath standard to be used in the underground operations at the NTS. Each portion of the standard was included only after careful consideration by the Working Group and is judged to be both effective and appropriate. The specific methods and rationale used by the Working Group are outlined as follows: The letter from DOE/HQ, dated September 28, 1990 cited OSHA and the CTSO as the safety and health codes applicable to underground operations at the NTS. These mandated codes were each originally developed to be comprehensive, i.e., all underground operations of a particular type (e.g., tunnels in the case of the CTSO) were intended to be adequately regulated by the appropriate code. However, this is not true; the Working Group found extensive and confusing overlap in the codes in numerous areas. Other subjects and activities were addressed by the various codes in cursory fashion or not at all

  10. US Department of Energy DOE Nevada Operations Office, Nevada Test Site: Underground safety and health standards

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The Nevada Test Site Underground Safety and Health Standards Working Group was formed at the direction of John D. Stewart, Director, Nevada Test Site Office in April, 1990. The objective of the Working Group was to compile a safety and health standard from the California Tunnel Safety Orders and OSHA for the underground operations at the NTS, (excluding Yucca Mountain). These standards are called the NTS U/G Safety and Health Standards. The Working Group submits these standards as a RECOMMENDATION to the Director, NTSO. Although the Working Group considers these standards to be the most integrated and comprehensive standards that could be developed for NTS Underground Operations, the intent is not to supersede or replace any relevant DOE orders. Rather the intent is to collate the multiple safety and health references contained in DOE Order 5480.4 that have applicability to NTS Underground Operations into a single safety and heath standard to be used in the underground operations at the NTS. Each portion of the standard was included only after careful consideration by the Working Group and is judged to be both effective and appropriate. The specific methods and rationale used by the Working Group are outlined as follows: The letter from DOE/HQ, dated September 28, 1990 cited OSHA and the CTSO as the safety and health codes applicable to underground operations at the NTS. These mandated codes were each originally developed to be comprehensive, i.e., all underground operations of a particular type (e.g., tunnels in the case of the CTSO) were intended to be adequately regulated by the appropriate code. However, this is not true; the Working Group found extensive and confusing overlap in the codes in numerous areas. Other subjects and activities were addressed by the various codes in cursory fashion or not at all.

  11. A Guidebook for Evaluating Organizations in the Nuclear Industry - an example of safety culture evaluation

    International Nuclear Information System (INIS)

    Oedewald, Pia; Pietikaeinen, Elina; Reiman, Teemu

    2011-06-01

    Organizations in the nuclear industry need to maintain an overview on their vulnerabilities and strengths with respect to safety. Systematic periodical self assessments are necessary to achieve this overview. This guidebook provides suggestions and examples to assist power companies but also external evaluators and regulators in carrying out organizational evaluations. Organizational evaluation process is divided into five main steps. These are: 1) planning the evaluation framework and the practicalities of the evaluation process, 2) selecting data collection methods and conducting the data acquisition, 3) structuring and analysing the data, 4) interpreting the findings and 5) reporting the evaluation results with possible recommendations. The guidebook emphasises the importance of a solid background framework when dealing with multifaceted phenomena like organisational activities and system safety. The validity and credibility of the evaluation stem largely from the evaluation team's ability to crystallize what they mean by organization and safety when they conduct organisational safety evaluations - and thus, what are the criteria for the evaluation. Another important and often under-considered phase in organizational evaluation is interpretation of the findings. In this guidebook a safety culture evaluation in a Nordic nuclear power plant is presented as an example of organizational evaluation. With the help of the example, challenges of each step in the organizational evaluation process are described. Suggestions for dealing with them are presented. In the case example, the DISC (Design for Integrated Safety culture) model is used as the evaluation framework. The DISC model describes the criteria for a good safety culture and the organizational functions necessary to develop a good safety culture in the organization

  12. Natural phenomena evaluations of the K-25 site UF6 cylinder storage yards

    International Nuclear Information System (INIS)

    Fricke, K.E.

    1996-01-01

    The K-25 Site UF 6 cylinder storage yards are used for the temporary storage of UF 6 normal assay cylinders and long-term storage of other UF 6 cylinders. The K-25 Site UF 6 cylinder storage yards consist of six on-site areas: K-1066-B, K-1066-E, K-1066-F, K-1066-J, K-1066-K and K-1066-L. There are no permanent structures erected on the cylinder yards, except for five portable buildings. The operating contractor for the K-25 Site is preparing a Safety Analysis Report (SAR) to examine the safety related aspects of the K-25 Site UF 6 cylinder storage yards. The SAR preparation encompasses many tasks terminating in consequence analysis for the release of gaseous and liquid UF 6 , one of which is the evaluation of natural phenomena threats, such as earthquakes, floods, and winds. In support of the SAR, the six active cylinder storage yards were evaluated for vulnerabilities to natural phenomena, earthquakes, high winds and tornados, tornado-generated missiles, floods (local and regional), and lightning. This report summarizes those studies. 30 refs

  13. Development of evaluation method for software safety analysis techniques

    International Nuclear Information System (INIS)

    Huang, H.; Tu, W.; Shih, C.; Chen, C.; Yang, W.; Yih, S.; Kuo, C.; Chen, M.

    2006-01-01

    Full text: Full text: Following the massive adoption of digital Instrumentation and Control (I and C) system for nuclear power plant (NPP), various Software Safety Analysis (SSA) techniques are used to evaluate the NPP safety for adopting appropriate digital I and C system, and then to reduce risk to acceptable level. However, each technique has its specific advantage and disadvantage. If the two or more techniques can be complementarily incorporated, the SSA combination would be more acceptable. As a result, if proper evaluation criteria are available, the analyst can then choose appropriate technique combination to perform analysis on the basis of resources. This research evaluated the applicable software safety analysis techniques nowadays, such as, Preliminary Hazard Analysis (PHA), Failure Modes and Effects Analysis (FMEA), Fault Tree Analysis (FTA), Markov chain modeling, Dynamic Flowgraph Methodology (DFM), and simulation-based model analysis; and then determined indexes in view of their characteristics, which include dynamic capability, completeness, achievability, detail, signal/ noise ratio, complexity, and implementation cost. These indexes may help the decision makers and the software safety analysts to choose the best SSA combination arrange their own software safety plan. By this proposed method, the analysts can evaluate various SSA combinations for specific purpose. According to the case study results, the traditional PHA + FMEA + FTA (with failure rate) + Markov chain modeling (without transfer rate) combination is not competitive due to the dilemma for obtaining acceptable software failure rates. However, the systematic architecture of FTA and Markov chain modeling is still valuable for realizing the software fault structure. The system centric techniques, such as DFM and Simulation-based model analysis, show the advantage on dynamic capability, achievability, detail, signal/noise ratio. However, their disadvantage are the completeness complexity

  14. Software quality assurance for safety analysis and risk management at the Savannah River Site

    International Nuclear Information System (INIS)

    Ades, M.J.; Toffer, H.; Crowe, R.D.

    1991-01-01

    As part of its Reactor Operations Improvement Program at the Savannah River Site (SRS), Westinghouse Savannah River Company (WSRC), in cooperation with the Westinghouse Hanford Company, has developed and implemented quality assurance for safety-related software for technical programs essential to the safety and reliability of reactor operations. More specifically, the quality assurance process involved the development and implementation of quality standards and attendant procedures based on industry software quality standards. These procedures were then applied to computer codes in reactor safety and probabilistic risk assessment analyses. This paper provides a review of the major aspects of the WSRC safety-related software quality assurance. In particular, quality assurance procedures are described for the different life cycle phases of the software that include the Requirements, Software Design and Implementation, Testing and Installation, Operation and Maintenance, and Retirement Phases. For each phase, specific provisions are made to categorize the range of activities, the level of responsibilities, and the documentation needed to assure the control of the software. The software quality assurance procedures developed and implemented are evolutionary in nature, and thus, prone to further refinements. These procedures, nevertheless, represent an effective controlling tool for the development, production, and operation of safety-related software applicable to reactor safety and probabilistic risk assessment analyses

  15. Criticality safety evaluation of disposing of K Basin sludge in double-shell tank AW-105

    International Nuclear Information System (INIS)

    ROGERS, C.A.

    1999-01-01

    A criticality safety evaluation is made of the disposal of K Basin sludge in double-shell tank (DST) AW-105 located in the 200 east area of Hanford Site. The technical basis is provided for limits and controls to be used in the development of a criticality prevention specification (CPS). A model of K Basin sludge is developed to account for fuel burnup. The iron/uranium mass ration required to ensure an acceptable magrin of subcriticality is determined

  16. Safety evaluation of the ESP sludge washing baselines runs. Revision 2

    International Nuclear Information System (INIS)

    Gupta, M.K.

    1993-01-01

    Purpose is to provide the technical basis for evaluation of unreviewed safety question for the Extended Sludge Processing (ESP) Sludge Washing Baseline Runs, which are necessary to resolve technical questions associated with process control (sludge suspension, sludge settling, heat transfer, temperature control). The sludge is currently stored in below-ground tanks and will be prepared for processing at the Defense Waste Processing Facility as part of the Integrated Waste Removal Program for Savannah River Site

  17. Evaluation of the Finnish nuclear safety research program 'SAFIR2010'

    International Nuclear Information System (INIS)

    2010-01-01

    A panel of three members has been asked by the Ministry of Employment and the Economy (MEE) to evaluate SAFIR2010, the Finnish research program on nuclear power plant safety. The program was established for the period 2007-2010 to help maintain expertise in nuclear safety, to integrate young people into the research in order to help assure the future availability of expertise, and to support international collaborations. The program is directed by a Steering Group, appointed by MEE, with representatives from all organizations involved with nuclear safety in Finland. SAFIR2010 has consisted of approximately 30 projects from year to year that fall into eight subject areas: 1. Organization and human factors 2. Automation and control room 3. Fuel and reactor physics 4. Thermal hydraulics 5. Severe accidents 6. Structural safety of reactor circuit 7. Construction safety 8. Probabilistic safety analysis (PSA) For each of these areas there are Reference Groups that provide oversight of the projects within their jurisdiction. The panel carried out its evaluation by reviewing copies of relevant documents and, during a one-week period 17-22 January 2010, meeting with key individuals. The results of the panel are provided as general conclusions, responses to questions posed by MEE, challenges and recommendations and comments on specific projects in each subject area. The general conclusions reflect the panel's view that SAFIR2010 is meeting its objectives and carrying out quality research. The questions addressed are: (a.) Are the achieved results in balance with the funding? Are the results exploited efficiently in practice? (b.) How well does the expertise cover the field? Is the entire SAFIR2010 programme balanced to all different fields in nuclear safety? Does it raise efficiently new experts? (c.) Have the 2006 evaluation results been implemented successfully into SAFIR2010 program? (d.) Challenges and recommendations. In general the panel was very positive about SAFIR

  18. Evaluation of behaviour and Safety in a geologic deep repository

    International Nuclear Information System (INIS)

    1997-01-01

    This report presents a comprehensive description of the post-closure radiological safety assessment of a repository for the spent fuel arisings resulting from the Spanish nuclear program. This Safety Assessment constitutes a first step within a systematical process that will permit, thorough successive approximations, to predict the performance of the different barriers of the disposal system, and its capability to comply with the assigned safety functions and with the established safety criteria. The primary bases for this Safety Assessment are the following: The disposal concept considers the storage of the fuel assemblies in carbon steel canisters of 10 cm of thickness, emplaced horizontally in galleries excavated in granite of 2,4 m of diameter and 500 m of length, using a bentonite thickness of 75 cm around canisters as buffer material. The repository is located in a granitic site defined with available data about surface characteristics of Spanish granites. The exercise uses a probabilistic approximation in order to cope with the uncertainties associated with the different imputs parameters. (Author)

  19. Development of a comprehensive management site evaluation methodology

    International Nuclear Information System (INIS)

    Rodgers, J.C.; Onishi, Y.

    1981-01-01

    The Nuclear Regulatory Commission is in the process of preparing regulations that will define the necessary conditions for adequate disposal of low-level waste (LLW) by confinement in an LLW disposal facility. These proposed regulations form the context in which the motivation for the joint Los Alamos National Laboratory Battelle Pacific Northwest Laboratory program to develop a site-specific, LLW site evaluation methodology is discussed. The overall effort is divided into three development areas: land-use evaluation, environmental transport modelling, and long term scenario development including long-range climatology projections. At the present time four steps are envisioned in the application of the methodology to a site: site land use suitability assessment, land use-ecosystem interaction, contaminant transport simulation, and sensitivity analysis. Each of these steps is discussed in the paper. 12 refs

  20. Evaluating an Entertainment–Education Telenovela to Promote Workplace Safety

    Directory of Open Access Journals (Sweden)

    Diego E. Castaneda

    2013-08-01

    Full Text Available Occupational safety and health professionals worked with health communication experts to collaborate with a major Spanish language television network to develop and implement a construction workplace safety media intervention targeting Latino/Hispanic audiences. An Entertainment–Education (EE health communication strategy was used to create a worksite safety storyline weaved into the main plot of a nationally televised Telenovela (Spanish language soap opera. A secondary analysis of audience survey data in a pre/posttest cross-sectional equivalent group design was performed to evaluate the effectiveness of this EE media intervention to change knowledge, attitudes, and intention outcomes related to the prevention of fatal falls at construction worksites. Results indicate that using culturally relevant mediums can be an effective way of reaching and educating audiences about specific fall prevention information. This is aligned with recommendations by the Institute of Medicine (IOM to increase interventions and evaluations of culturally relevant and competent health communication.

  1. Evaluating Performance of Safety Management and Occupational Health Using Total Quality Safety Management Model (TQSM

    Directory of Open Access Journals (Sweden)

    E Mohammadfam

    2015-11-01

    Full Text Available Introduction: All organizations, whether public or private, necessitate performance evaluation systems in regard with growth, stability, and development in the competitive fields. One of the existing models for performance evaluation of occupational health and safety management is Total Quality Safety Management model (TQSM. Therefore, the present study aimed to evaluate performance of safety management and occupational health utilizing TQSM model. Methods: In this descriptive-analytic study, the population consisted of 16 individuals, including managers, supervisors, and members of technical protection and work health committee. Then the participants were asked to respond to TQSM questionnaire before and after the implementation of Occupational Health & Safety Advisory Services 18001 (OHSAS18001. Ultimately, the level of each program as well as the TQSM status were determined before and after the implementation of OHSAS18001. Results: The study results showed that the scores obtained by the company before OHSAS 18001’s implementation, was 43.7 out of 312. After implementing OHSAS 18001 in the company and receiving the related certificate, the total score of safety program that company could obtain was 127.12 out of 312 demonstrating a rise of 83.42 scores (26.8%. The paired t-test revealed that mean difference of TQSM scores before and after OHSAS 18001 implementation was proved to be significant (p> 0.05. Conclusion: The study findings demonstrated that TQSM can be regarded as an appropriate model in order to monitor the performance of safety management system and occupational health, since it possesses the ability to quantitatively evaluate the system performance.

  2. Siting Evaluation for Biomass-Ethanol Production in Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Kinoshita, C.M.; Zhou, J.

    2000-10-15

    This report examines four Hawaiian islands, Oahu, Hawaii, Maui, and Kauai, to identify three best combinations of potential sites and crops for producing dedicated supplies of biomass for conversion to ethanol. Key technical and economic factors considered in the siting evaluation include land availability (zoning and use), land suitability (agronomic conditions), potential quantities and costs of producing biomass feedstocks, infrastructure (including water and power supplies), transportation, and potential bioresidues to supplement dedicated energy crops.

  3. Control of safety and risk management software at the Savannah River Site

    International Nuclear Information System (INIS)

    Ades, M.J.; Toffer, H.; Crowe, R.D.

    1992-01-01

    As a part of its Reactor Operations Improvement Program at the Savannah River Site (SRS), Westinghouse Savannah River Company (WSRC), in cooperation with the Westinghouse Hanford Company, has developed and implemented software quality assurance (SQA) for computer codes essential to the safety and reliability of reactor operations. This effort includes the use of quality standards and attendant procedures developed for and applied to computer codes used in safety and risk management analyses. The certification process that was recently implemented is in compliance with site wide and departmental SQA requirements. Certification consists of preparing a specific verification and validation (V and V) plan, a configuration control plan, and user qualifications. Applicable documentation is reviewed to determine compliance with V and V and configuration control action items. The results of this review are documented and serve as a baseline for additional certification activities. Resource commitment and schedules are drawn up for each individual code to complete certification in accordance with SQA requirements

  4. US Department of Energy Environment, Safety and Health Progress Assessment of the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-01

    This report documents the result of the US Department of Energy (DOE) Environment, Safety, and Health (ES&H) Progress Assessment of the Nevada Test Site (NTS), Nye County, Nevada. The assessment, which was conducted from July 20 through August 4, 1992, included a selective review of the ES&H management systems and progress of the responsible DOE Headquarters Program Offices; the DOE Nevada Field Office (NV); and the site contractors. The ES&H Progress Assessments are part of the Secretary of Energy`s continuing effort to institutionalize line management accountability and the self-assessment process throughout DOE and its contractor organizations. This report presents a summary of issues and progress in the areas of environment, safety and health, and management.

  5. US Department of Energy Environment, Safety and Health Progress Assessment of the Nevada Test Site

    International Nuclear Information System (INIS)

    1992-08-01

    This report documents the result of the US Department of Energy (DOE) Environment, Safety, and Health (ES ampersand H) Progress Assessment of the Nevada Test Site (NTS), Nye County, Nevada. The assessment, which was conducted from July 20 through August 4, 1992, included a selective review of the ES ampersand H management systems and progress of the responsible DOE Headquarters Program Offices; the DOE Nevada Field Office (NV); and the site contractors. The ES ampersand H Progress Assessments are part of the Secretary of Energy's continuing effort to institutionalize line management accountability and the self-assessment process throughout DOE and its contractor organizations. This report presents a summary of issues and progress in the areas of environment, safety and health, and management

  6. Construction of Earthquake-Proof Safety Evaluation Methods for Pipes with Wall Thinning

    International Nuclear Information System (INIS)

    Miyano, Hiroshi; Sekimura, Naoto; Takizawa, Masayuki; Matsumoto, Masaaki

    2012-01-01

    After the accident at the Fukushima Daiichi Nuclear Power Plant, the extreme importance of 'system safety' evaluation has been recognized. In this study, some fundamental ways of thinking about the concept of 'system safety' for operating plants is shown, and concrete evaluation structures of system safety are proposed. System safety for nuclear power plants and safety assessment for aging plants are constructed. (author)

  7. Some problems of neutron source multiplication method for site measurement technology in nuclear critical safety

    International Nuclear Information System (INIS)

    Shi Yongqian; Zhu Qingfu; Hu Dingsheng; He Tao; Yao Shigui; Lin Shenghuo

    2004-01-01

    The paper gives experiment theory and experiment method of neutron source multiplication method for site measurement technology in the nuclear critical safety. The measured parameter by source multiplication method actually is a sub-critical with source neutron effective multiplication factor k s , but not the neutron effective multiplication factor k eff . The experiment research has been done on the uranium solution nuclear critical safety experiment assembly. The k s of different sub-criticality is measured by neutron source multiplication experiment method, and k eff of different sub-criticality, the reactivity coefficient of unit solution level, is first measured by period method, and then multiplied by difference of critical solution level and sub-critical solution level and obtained the reactivity of sub-critical solution level. The k eff finally can be extracted from reactivity formula. The effect on the nuclear critical safety and different between k eff and k s are discussed

  8. Safety evaluation of a conceptual fuel recycle complex

    International Nuclear Information System (INIS)

    Hodges, M.E.

    1980-01-01

    A conceptual design integration study for an integrated Fuel Recycle Complex (FRC) has been completed. A safety evaluation of the radiation shielding, fire precautions, handling of nonradioactive hazardous materials, criticality hazards, operating errors, and the influence of natural phenomena on the FRC shows that all federal regulations are met or exceeded

  9. Evaluation of pesticide safety measures adopted by potato farmers ...

    African Journals Online (AJOL)

    In order to increase productivity and quality, farmers use pesticides and other agrochemicals. These pesticides if improperly handled impact negatively on the health of the users. The objective of the study was to evaluate the pesticide safety measures adopted by potato farmers in Chebiemit Division of Elgeyo/Marakwet ...

  10. Safety evaluation of substituted thiophenes used as flavoring ingredients

    NARCIS (Netherlands)

    Cohen, Samuel M.; Fukushima, Shoji; Gooderham, Nigel J.; Guengerich, F.P.; Hecht, Stephen S.; Rietjens, Ivonne M.C.M.; Smith, Robert L.; Bastaki, Maria; Harman, Christie L.; McGowen, Margaret M.; Valerio, Luis G.; Taylor, Sean V.

    2017-01-01

    This publication is the second in a series by the Expert Panel of the Flavor and Extract Manufacturers Association summarizing the conclusions of its third systematic re-evaluation of the safety of flavorings previously considered to be generally recognized as safe (GRAS) under conditions of

  11. Recommendations for preparing the criticality safety evaluation of transportation packages

    International Nuclear Information System (INIS)

    Dyer, H.R.; Parks, C.V.

    1997-04-01

    This report provides recommendations on preparing the criticality safety section of an application for approval of a transportation package containing fissile material. The analytical approach to the evaluation is emphasized rather than the performance standards that the package must meet. Where performance standards are addressed, this report incorporates the requirements of 10 CFR Part 71. 12 refs., 6 figs., 8 tabs

  12. Evaluation and Customization of WHO Safety Checklist for Patient Safety in Otorhinolaryngology.

    Science.gov (United States)

    Dabholkar, Yogesh; Velankar, Haritosh; Suryanarayan, Sneha; Dabholkar, Twinkle Y; Saberwal, Akanksha A; Verma, Bhavika

    2018-03-01

    The WHO has designed a safe surgery checklist to enhance communication and awareness of patient safety during surgery and to minimise complications. WHO recommends that the check-list be evaluated and customised by end users as a tool to promote safe surgery. The aim of present study was to evaluate the impact of WHO safety checklist on patient safety awareness in otorhinolaryngology and to customise it for the speciality. A prospective structured questionnaire based study was done in ENT operating room for duration of 1 month each for cases, before and after implementation of safe surgery checklist. The feedback from respondents (surgeons, nurses and anaesthetists) was used to arrive at a customised checklist for otolaryngology as per WHO guidelines. The checklist significantly improved team member's awareness of patient's identity (from 17 to 86%) and each other's identity and roles (from 46 to 94%) and improved team communication (from 73 to 92%) in operation theatre. There was a significant improvement in preoperative check of equipment and critical events were discussed more frequently. The checklist could be effectively customised to suit otolaryngology needs as per WHO guidelines. The modified checklist needs to be validated by otolaryngology associations. We conclude from our study that the WHO Surgical safety check-list has a favourable impact on patient safety awareness, team-work and communication of operating team and can be customised for otolaryngology setting.

  13. Seismic qualification of safety class components in non-reactor nuclear facilities at Hanford site

    International Nuclear Information System (INIS)

    Ocoma, E.C.

    1989-01-01

    This paper presents the methods used during the walkdowns to compile as-built structural information to seismically qualify or verify the seismic adequacy of safety class components in the Plutonium Finishing Plant complex. The Plutonium finishing Plant is a non-reactor nuclear facility built during the 1950's and was designed to the Uniform Building Code criteria for both seismic and wind events. This facility is located at the US Department of Energy Hanford Site near Richland, Washington

  14. Rock siting of nuclear power plants from a reactor safety standpoint. Status report October 1974

    International Nuclear Information System (INIS)

    1975-01-01

    The aim of this study is to clearify the advantages and disadvantages of an underground nuclear power plant from a reactor safety point of view, compared to a plant above ground. Principles for the technical design of a rock sited BWR nuclear power plant is presented. Also questions of sabotage and closing down the plant at the end of the operational period are treated. (K.K.)

  15. Safety Evaluation for Packaging (onsite) T Plant Canyon Items

    International Nuclear Information System (INIS)

    OBRIEN, J.H.

    2000-01-01

    This safety evaluation for packaging (SEP) evaluates and documents the ability to safely ship mostly unique inventories of miscellaneous T Plant canyon waste items (T-P Items) encountered during the canyon deck clean off campaign. In addition, this SEP addresses contaminated items and material that may be shipped in a strong tight package (STP). The shipments meet the criteria for onsite shipments as specified by Fluor Hanford in HNF-PRO-154, Responsibilities and Procedures for all Hazardous Material Shipments

  16. Evaluation of safety-parameter display concepts. Final report

    International Nuclear Information System (INIS)

    Woods, D.D.; Wise, J.A.; Hanes, L.F.

    1982-02-01

    New control room equipment designed to improve operator performance must be evaluated before adoption and installation. Two experimental concepts for a Safety Parameters Display System (SPDS) were evaluated to assess benefits and potential problems associated with the SPDS concept and its integration into control room operations. Participants were licensed utility operators undergoing retraining on a nuclear power plant simulator. Both quantitative and qualitative data were collected and analyzed on crew response to seven simulated accident conditions

  17. Safety Evaluation for Packaging (onsite) T Plant Canyon Items

    Energy Technology Data Exchange (ETDEWEB)

    OBRIEN, J.H.

    2000-07-14

    This safety evaluation for packaging (SEP) evaluates and documents the ability to safely ship mostly unique inventories of miscellaneous T Plant canyon waste items (T-P Items) encountered during the canyon deck clean off campaign. In addition, this SEP addresses contaminated items and material that may be shipped in a strong tight package (STP). The shipments meet the criteria for onsite shipments as specified by Fluor Hanford in HNF-PRO-154, Responsibilities and Procedures for all Hazardous Material Shipments.

  18. Scar evaluation of split thickness skin graft donor site

    Directory of Open Access Journals (Sweden)

    Jani Muha

    2014-12-01

    Full Text Available BACKGROUND. Split thickness skin graft harvesting causes a certain degree of scaring on the donor site. Donor site scar can cause aesthetic and functional sequelae on the patient's body. Our goal was to study the process of donor site selection, and then evaluate donor site scars and their impact on patients. PATIENTS AND METHODS. This retrospective study included 45 patients aged 5 to 61 years (in average 36, who have been treated with STSG in the 2004–2010 period. 57.8% of them were men. On a follow-up visit, we photographed healed skin defects and donor sites. We then determined and compared the surface areas of skin defect and the donor site using the Adobe® Illustrator® CS5 computer program. Donor site scars were assessed according to the Vancouver scar scale (VSS. We examined scar’s light touch sensitivity with monofilaments and skin colouring compared to adjacent healthy skin using colorimeter. Patients were also interviewed about their treatment course in a form of a standardized questionnaire. RESULTS. Our research has revealed that 20.0% of patients participated in the decision making process of choosing the donor site, while in 80.0% the donor site was chosen by the surgeon himself. 6.7% of patients were not satisfied with their donor site. Most of the patients (37/45 had donor sites on their thighs. In average, the donor site surface area was 94% bigger than the skin defect area. We found statistically significant differences in VSS values, light touch sensitivity and skin colouring between donor site scaring and adjacent healthy skin. CONCLUSIONS. Donor site scar can represent a lasting aesthetic and functional disability for patients. Our research has shown that most of the patients do not participate in the donor site selection process, but are satisfied with their donor site. In most cases, STGSs are harvested from the thigh, other anatomical regions, where scarring would be aesthetically less obtrusive, are underused

  19. International handbook of evaluated criticality safety benchmark experiments

    International Nuclear Information System (INIS)

    2010-01-01

    The Criticality Safety Benchmark Evaluation Project (CSBEP) was initiated in October of 1992 by the United States Department of Energy. The project quickly became an international effort as scientists from other interested countries became involved. The International Criticality Safety Benchmark Evaluation Project (ICSBEP) became an official activity of the Organization for Economic Cooperation and Development - Nuclear Energy Agency (OECD-NEA) in 1995. This handbook contains criticality safety benchmark specifications that have been derived from experiments performed at various nuclear critical facilities around the world. The benchmark specifications are intended for use by criticality safety engineers to validate calculational techniques used to establish minimum subcritical margins for operations with fissile material and to determine criticality alarm requirement and placement. Many of the specifications are also useful for nuclear data testing. Example calculations are presented; however, these calculations do not constitute a validation of the codes or cross section data. The evaluated criticality safety benchmark data are given in nine volumes. These volumes span over 55,000 pages and contain 516 evaluations with benchmark specifications for 4,405 critical, near critical, or subcritical configurations, 24 criticality alarm placement / shielding configurations with multiple dose points for each, and 200 configurations that have been categorized as fundamental physics measurements that are relevant to criticality safety applications. Experiments that are found unacceptable for use as criticality safety benchmark experiments are discussed in these evaluations; however, benchmark specifications are not derived for such experiments (in some cases models are provided in an appendix). Approximately 770 experimental configurations are categorized as unacceptable for use as criticality safety benchmark experiments. Additional evaluations are in progress and will be

  20. Safety and cost evaluation of nuclear waste management

    International Nuclear Information System (INIS)

    Vieno, T.; Hautojaervi, A.; Korhonen, R.

    1989-11-01

    The report introduces the results of the nuclear waste management safety and cost evaluation research carried out in the Nuclear Engineering Laboratory of the Technical Research Centre of Finland (VTT) during the years 1984-1988. The emphasis is on the description of the state-of-art of performance and cost evaluation methods. The report describes VTT's most important assessment models. Development, verification and validation of the models has largely taken place within international projects, including the Stripa, HYDROCOIN, INTRACOIN, INTRAVAL, PSACOIN and BIOMOVS projects. Furthermore, VTT's other laboratories are participating in the Natural Analogue Working Group,k the CHEMVAL project and the CoCo group. Resent safety analyses carried out in the Nuclear Engineering Laboratory include a concept feasibility study of spent fuel disposal, safety analyses for the Preliminary Safety Analysis Reports (PSAR's) of the repositories to be constructed for low and medium level operational reactor waste at the Olkiluoto and Loviisa power plants as well as safety analyses of disposal of decommissioning wastes. Appendix 1 contains a comprehensive list of the most important publications and technical reports produced. They present the content and results of the research in detail

  1. Taipower's reload safety evaluation methodology for pressurized water reactors

    International Nuclear Information System (INIS)

    Huang, Ping-Hue; Yang, Y.S.

    1996-01-01

    For Westinghouse pressurized water reactors (PWRs) such as Taiwan Power Company's (TPC's) Maanshan Units 1 and 2, each of the safety analysis is performed with conservative reload related parameters such that reanalysis is not expected for all subsequent cycles. For each reload cycle design, it is required to perform a reload safety evaluation (RSE) to confirm the validity of the existing safety analysis for fuel cycle changes. The TPC's reload safety evaluation methodology for PWRs is based on 'Core Design and Safety Analysis Package' developed by the TPC and the Institute of Nuclear Energy Research (INER), and is an important portion of the 'Taipower's Reload Design and Transient Analysis Methodologies for Light Water Reactors'. The Core Management System (CMS) developed by Studsvik of America, the one-dimensional code AXINER developed by TPC, National Tsinghua University and INER, and a modified version of the well-known subchannel core thermal-hydraulic code COBRAIIIC are the major computer codes utilized. Each of the computer models is extensively validated by comparing with measured data and/or vendor's calculational results. Moreover, parallel calculations have been performed for two Maanshan reload cycles to validate the RSE methods. The TPC's in-house RSE tools have been applied to resolve many important plant operational issues and plant improvements, as well as to verify the vendor's fuel and core design data. (author)

  2. Home safe home: Evaluation of a childhood home safety program.

    Science.gov (United States)

    Stewart, Tanya Charyk; Clark, Andrew; Gilliland, Jason; Miller, Michael R; Edwards, Jane; Haidar, Tania; Batey, Brandon; Vogt, Kelly N; Parry, Neil G; Fraser, Douglas D; Merritt, Neil

    2016-09-01

    The London Health Sciences Centre Home Safety Program (HSP) provides safety devices, education, a safety video, and home safety checklist to all first-time parents for the reduction of childhood home injuries. The objective of this study was to evaluate the HSP for the prevention of home injuries in children up to 2 years of age. A program evaluation was performed with follow-up survey, along with an interrupted time series analysis of emergency department (ED) visits for home injuries 5 years before (2007-2013) and 2 years after (2013-2015) implementation. Spatial analysis of ED visits was undertaken to assess differences in home injury rates by dissemination areas controlling differences in socioeconomic status (i.e., income, education, and lone-parent status) at the neighborhood level. A total of 3,458 first-time parents participated in the HSP (a 74% compliance rate). Of these, 20% (n = 696) of parents responded to our questionnaire, with 94% reporting the program to be useful (median, 6; interquartile range, 2 on a 7-point Likert scale) and 81% learning new strategies for preventing home injuries. The median age of the respondent's babies were 12 months (interquartile range, 1). The home safety check list was used by 87% of respondents to identify hazards in their home, with 95% taking action to minimize the risk. The time series analysis demonstrated a significant decline in ED visits for home injuries in toddlers younger than2 years of age after HSP implementation. The declines in ED visits for home injuries remained significant over and above each socioeconomic status covariate. Removing hazards, supervision, and installing safety devices are key facilitators in the reduction of home injuries. Parents found the HSP useful to identify hazards, learn new strategies, build confidence, and provide safety products. Initial finding suggests that the program is effective in reducing home injuries in children up to 2 years of age. Therapeutic/care management study

  3. Removal site evaluation report on Building 7602 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    This removal site evaluation report for Building 7602 at Oak Ridge National Laboratory was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the facility pose a substantial risk to human health or the environment (i.e., a high probability of adverse effects) and whether remedial site evaluations or removal actions are, therefore, required. The scope of the project included (1) a search for, and review of, readily available historical records regarding operations and use of the facility (including hazardous substance usage and existing contamination); (2) interviews with facility personnel concerning current and past practices; and (3) a brief walk-through to visually inspect the facility and identify existing hazard areas requiring maintenance actions, removal actions, or remedial evaluation. The results of the removal site evaluation indicate that areas associated with Building 7602 pose no imminent hazards requiring maintenance actions. Adequate engineering and administrative controls are in place and enforced within the facility to ensure worker and environmental protection. Current actions that are being taken to prevent further release of contamination and ensure worker safety within Building 7602 are considered adequate until decontamination and decommissioning activities begin. Given the current status and condition of Building 7602, this removal site evaluation is considered complete and terminated

  4. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task

    International Nuclear Information System (INIS)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI ampersand SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI ampersand SI field task must include (1) the general health and safety program plan for all WAG 2 RI ampersand SI field activities and (2) a WP/HSC for that particular field task. These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169

  5. Evaluative Testing of 5LA3421: A Multicomponent Prehistoric and Historic Site, Pinon Canyon Maneuver Site, Las Animas County, Colorado

    National Research Council Canada - National Science Library

    Charles, Mona; Baker, Thann; Markussen, Christine; Nathan, Randy; Duke, Philip

    2004-01-01

    In the summer of 2002, evaluative testing was undertaken at a large multicomponent site for the purpose of evaluating the potential of this site to yield significant information about the prehistory...

  6. Supporting documents for LLL area 27 (410 area) safety analysis reports, Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    Odell, B. N. [comp.

    1977-02-01

    The following appendices are common to the LLL Safety Analysis Reports Nevada Test Site and are included here as supporting documents to those reports: Environmental Monitoring Report for the Nevada Test Site and Other Test Areas Used for Underground Nuclear Detonations, U. S. Environmental Protection Agency, Las Vegas, Rept. EMSL-LV-539-4 (1976); Selected Census Information Around the Nevada Test Site, U. S. Environmental Protection Agency, Las Vegas, Rept. NERC-LV-539-8 (1973); W. J. Hannon and H. L. McKague, An Examination of the Geology and Seismology Associated with Area 410 at the Nevada Test Site, Lawrence Livermore Laboratory, Livermore, Rept. UCRL-51830 (1975); K. R. Peterson, Diffusion Climatology for Hypothetical Accidents in Area 410 of the Nevada Test Site, Lawrence Livermore Laboratory, Livermore, Rept. UCRL-52074 (1976); J. R. McDonald, J. E. Minor, and K. C. Mehta, Development of a Design Basis Tornado and Structural Design Criteria for the Nevada Test Site, Nevada, Lawrence Livermore Laboratory, Livermore, Rept. UCRL-13668 (1975); A. E. Stevenson, Impact Tests of Wind-Borne Wooden Missiles, Sandia Laboratories, Tonopah, Rept. SAND 76-0407 (1976); and Hydrology of the 410 Area (Area 27) at the Nevada Test Site.

  7. First investigations on the safety evaluation of smart sensors

    International Nuclear Information System (INIS)

    Bousquet, S.; Elsensohn, O.

    2001-10-01

    IPSN (Institute for Protection and Nuclear Safety) is the technical support for the French nuclear safety authority and thus involved in the safety evaluation of new I and C technologies and particularly of smart sensors. Smart sensors are characterized by the use of a microprocessor that converts the process variable into digital signals and exchanges other information with I and C control systems. There are two types of smart sensors: HART (Highway Addressable Remote Transducer) sensors, which provide both analogue (4 to 20 mA) and digital signals, and network sensors, which provide only digital signals. The expected benefits for operators are improved accuracy and reliability and cost savings in installation, commissioning, testing and maintenance. Safety evaluation of these smart sensors raises new issues: How does the sensor react to unknown commands? How to avoid unexpected changes in configuration? What is its sensitivity to electromagnetic interferences (EMI), to radiations...? In order to evaluate whether these sensors can be qualified for a safety application and to define the qualification tests to be done, IPSN has planned some functional and hardware tests (EMI, radiations) on 'HART' and field bus sensors. During the functional tests, we were not able to disrupt the HART tested sensors by invalid commands. However, these results cannot be extended to other sensors, because of the use of different technology, of different versions of hardware and software and of constructors' specific commands. Furthermore, easy modifications of configuration parameters can cause additional failures. Environmental tests are in progress on HART sensors and will be followed by experiments on field bus sensors. These preliminary investigations and the latest incident initiated by an incorrect computing algorithm of digital switchgear at Ringhals NPP, clearly illustrate that testing and verification programmes for smart equipment must be meticulously designed and reviewed

  8. First investigations on the safety evaluation of smart sensors

    Energy Technology Data Exchange (ETDEWEB)

    Bousquet, S.; Elsensohn, O. [CEA Fontenay aux Roses, 92 (France). Inst. de Protection et de Surete Nucleaire; Benoit, G. [CEA Saclay, Dir. de la Recherche Technologique DRT, 91 - Gif sur Yvette (France)

    2001-10-01

    IPSN (Institute for Protection and Nuclear Safety) is the technical support for the French nuclear safety authority and thus involved in the safety evaluation of new I and C technologies and particularly of smart sensors. Smart sensors are characterized by the use of a microprocessor that converts the process variable into digital signals and exchanges other information with I and C control systems. There are two types of smart sensors: HART (Highway Addressable Remote Transducer) sensors, which provide both analogue (4 to 20 mA) and digital signals, and network sensors, which provide only digital signals. The expected benefits for operators are improved accuracy and reliability and cost savings in installation, commissioning, testing and maintenance. Safety evaluation of these smart sensors raises new issues: How does the sensor react to unknown commands? How to avoid unexpected changes in configuration? What is its sensitivity to electromagnetic interferences (EMI), to radiations...? In order to evaluate whether these sensors can be qualified for a safety application and to define the qualification tests to be done, IPSN has planned some functional and hardware tests (EMI, radiations) on 'HART' and field bus sensors. During the functional tests, we were not able to disrupt the HART tested sensors by invalid commands. However, these results cannot be extended to other sensors, because of the use of different technology, of different versions of hardware and software and of constructors' specific commands. Furthermore, easy modifications of configuration parameters can cause additional failures. Environmental tests are in progress on HART sensors and will be followed by experiments on field bus sensors. These preliminary investigations and the latest incident initiated by an incorrect computing algorithm of digital switchgear at Ringhals NPP, clearly illustrate that testing and verification programmes for smart equipment must be meticulously designed

  9. Design and implementation of an identification system in construction site safety for proactive accident prevention.

    Science.gov (United States)

    Yang, Huanjia; Chew, David A S; Wu, Weiwei; Zhou, Zhipeng; Li, Qiming

    2012-09-01

    Identifying accident precursors using real-time identity information has great potential to improve safety performance in construction industry, which is still suffering from day to day records of accident fatality and injury. Based on the requirements analysis for identifying precursor and the discussion of enabling technology solutions for acquiring and sharing real-time automatic identification information on construction site, this paper proposes an identification system design for proactive accident prevention to improve construction site safety. Firstly, a case study is conducted to analyze the automatic identification requirements for identifying accident precursors in construction site. Results show that it mainly consists of three aspects, namely access control, training and inspection information and operation authority. The system is then designed to fulfill these requirements based on ZigBee enabled wireless sensor network (WSN), radio frequency identification (RFID) technology and an integrated ZigBee RFID sensor network structure. At the same time, an information database is also designed and implemented, which includes 15 tables, 54 queries and several reports and forms. In the end, a demonstration system based on the proposed system design is developed as a proof of concept prototype. The contributions of this study include the requirement analysis and technical design of a real-time identity information tracking solution for proactive accident prevention on construction sites. The technical solution proposed in this paper has a significant importance in improving safety performance on construction sites. Moreover, this study can serve as a reference design for future system integrations where more functions, such as environment monitoring and location tracking, can be added. Copyright © 2011 Elsevier Ltd. All rights reserved.

  10. Evaluation of the mill tailings disposal site at the Zirovski vrh uranium mine in Slovenia

    International Nuclear Information System (INIS)

    Begus, T.; Kocevar, M.; Brencic, M.; Likar, B.; Logar, Z.

    2002-01-01

    Uranium mine Zirovski vrh in Slovenia was closed due to economic reasons. After that extensive work on decommission was done. The results of the comparison between three potential sites for mill tailings are presented. The results of the probabilistic approach to the factors of safety and confidence, seismic hazard analysis, hydrogeological models and in the economic evaluation are given. For the common evaluation they were interpreted in the way of UMTRA decision matrix. On the basis of the engineering judgement calculations for the recent status and the status after 1000 years was performed. (author)

  11. Site-characterization data needs for hydrogeological evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Geier, J. [Clearwater Hardrock Consulting, Monmouth, ON (United States)

    1997-12-01

    A review of data utilization and data sufficiency for the multiple lines of hydrological analysis in the SITE-94 study yields insight regarding how site characterization relates to key uncertainties in geologic-barrier performance for performance assessment (PA). Significant uncertainties arise from (1) lack of data regarding interrelationships between hydraulic and transport properties in water-conducting features, (2) insufficient data to discriminate between different conceptual models for large-scale spatial correlation of hydraulic properties, and (3) inadequate determination of effective boundary conditions for site-scale models. For future site characterization in support of hydrological modelling for PA, recommendations that can be offered includes: (1) to develop methods for the evaluation of site-specific transport properties, particularly flow porosity, flow wetted surface, matrix diffusion coefficients, and possibly effective sorption coefficients, (2) to emphasize the use of multiple tracers and multiple scales of observation in pumping and tracer tests, in order to allow evaluation of the effects of scale and heterogeneity in hydrologic and transport properties, (3) to develop a structured, systematic approach to borehole investigations, sampling, and core logging, in order to ensure that the data thus gathered will support meaningful statistical analysis, and to ensure that the development of alternative conceptual models is supported, and finally (4) to improve documentation and checking of site-characterization data in order to avoid unnecessary introduction of uncertainty in PA. A full list of recommendations is given in Chapter 4 of this report. 31 refs.

  12. Site-characterization data needs for hydrogeological evaluation

    International Nuclear Information System (INIS)

    Geier, J.

    1997-12-01

    A review of data utilization and data sufficiency for the multiple lines of hydrological analysis in the SITE-94 study yields insight regarding how site characterization relates to key uncertainties in geologic-barrier performance for performance assessment (PA). Significant uncertainties arise from (1) lack of data regarding interrelationships between hydraulic and transport properties in water-conducting features, (2) insufficient data to discriminate between different conceptual models for large-scale spatial correlation of hydraulic properties, and (3) inadequate determination of effective boundary conditions for site-scale models. For future site characterization in support of hydrological modelling for PA, recommendations that can be offered includes: (1) to develop methods for the evaluation of site-specific transport properties, particularly flow porosity, flow wetted surface, matrix diffusion coefficients, and possibly effective sorption coefficients, (2) to emphasize the use of multiple tracers and multiple scales of observation in pumping and tracer tests, in order to allow evaluation of the effects of scale and heterogeneity in hydrologic and transport properties, (3) to develop a structured, systematic approach to borehole investigations, sampling, and core logging, in order to ensure that the data thus gathered will support meaningful statistical analysis, and to ensure that the development of alternative conceptual models is supported, and finally (4) to improve documentation and checking of site-characterization data in order to avoid unnecessary introduction of uncertainty in PA. A full list of recommendations is given in Chapter 4 of this report

  13. Impact of external events on site evaluation: a probabilistic approach

    International Nuclear Information System (INIS)

    Jaccarino, E.; Giuliani, P.; Zaffiro, C.

    1975-01-01

    A probabilistic method is proposed for definition of the reference external events of nuclear sites. The external events taken into account are earthquakes, floods and tornadoes. On the basis of the available historical data for each event it is possible to perform statistical analyses to determine the probability of occurrence on site of events of given characteristics. For earthquakes, the method of analysis takes into consideration both the annual frequency of seismic events in Italy and the probabilistic distribution of areas stricken by each event. For floods, the methods of analysis of hydrological data and the basic criteria for the determination of design events are discussed and the general lines of the hydraulic analysis of a nuclear site are shown. For tornadoes, the statistical analysis has been performed for the events which occurred in Italy during the last 40 years; these events have been classified according to an empirical intensity scale. The probability of each reference event should be a function of the potential radiological damage associated with the particular type of plant which must be installed on the site. Thus the reference event could be chosen such that for the whole of the national territory the risk for safety and environmental protection is the same. (author)

  14. Obtention to the methodology for evaluation to the confirmation of the hazardous wastes safety isolation

    International Nuclear Information System (INIS)

    Peralta, J.L.; Gil, R.; Castillo, R.; Leyva, D.

    2003-01-01

    Taking into account, the practical experience of the safety assessment in the radioactive wastes management, the International Atomic Energy Agency (IAEA) recommendations in this topics, the norms and national and international legislation about noxious substances to the environment and their restriction limits, the best international practices and approaches of isolation hazardous wastes sites, a Methodology is developed (Cuba particular conditions) to obtaining and/or confirmation of the hazardous wastes safety isolation, as a tool able to carry out the assessment of facilities to build and all installation and/or place where hazardous wastes isolated from the environment. The Methodology, embraces the evaluation of technical, economic and social topics, allowing to develop an integral safety assessment which allows to estimate the environment possible impact for hazardous waste isolation (radioactive and non radioactive); Just are shown in this paper the selection approaches for the obtaining and/or evaluation of the best site, the steps description to continue for the definition of the main scenarios and the models to take into account in the valuation of the possible liberation and pathway to the environment of the non radioactive pollutants. The main contribution of this Methodology resides in the creation of a scientific-technique necessary guide for the evident demand of carrying out the most organized, effective and hazardous wastes safety management

  15. 29 CFR 1960.80 - Secretary's evaluations of agency occupational safety and health programs.

    Science.gov (United States)

    2010-07-01

    ... EMPLOYEE OCCUPATIONAL SAFETY AND HEALTH PROGRAMS AND RELATED MATTERS Evaluation of Federal Occupational Safety and Health Programs § 1960.80 Secretary's evaluations of agency occupational safety and health... evaluating an agency's occupational safety and health program. To accomplish this, the Secretary shall...

  16. Characterization and evaluation of sites for deep geological disposal of radioactive waste in fractured rocks. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    The third Aespoe International Seminar was organised by SKB to assess the state of the art in characterisation and evaluation of sites for deep geological disposal of radioactive waste in fractured rocks. Site characterisation and evaluation are important elements for determining the site suitability and long-term safety of a geological repository for radioactive waste disposal. Characterisation work also provides vital information for the design of the underground facility and the engineered barrier system that will contain the waste. The aim of the seminar was to provide a comprehensive assessment of the current know-how on this topic based on world-wide experience from more than 20 years of characterisation and evaluation work. The seminar, which was held at the Aespoe Hard Rock Laboratory was attended by 72 scientists from 10 different countries. The program was divided into four sessions of which two were run in parallel. A total of 38 oral and 5 poster presentations were given at the seminar. The presentations gave a comprehensive summary of recently completed and current work on site characterisation, modelling and application in performance assessments. The results presented at the seminar generally show that significant progress has been made in this field during the last decade. New characterisation techniques have become available, strategies for site investigations have developed further, and model concepts and codes have reached new levels of refinement. Data obtained from site characterisation have also successfully been applied in several site specific performance assessments. The seminar clearly showed that there is a solid scientific basis for assessing the suitability of sites for actual reposit