WorldWideScience

Sample records for short-term hydropower production

  1. Short-term hydropower production planning by stochastic programming

    DEFF Research Database (Denmark)

    Fleten, Stein-Erik; Kristoffersen, Trine

    2008-01-01

    -term production planning a matter of spatial distribution among the reservoirs of the plant. Day-ahead market prices and reservoir inflows are, however, uncertain beyond the current operation day and water must be allocated among the reservoirs in order to strike a balance between current profits and expected......Within the framework of multi-stage mixed-integer linear stochastic programming we develop a short-term production plan for a price-taking hydropower plant operating under uncertainty. Current production must comply with the day-ahead commitments of the previous day which makes short...

  2. Short-term forecasting model for aggregated regional hydropower generation

    International Nuclear Information System (INIS)

    Monteiro, Claudio; Ramirez-Rosado, Ignacio J.; Fernandez-Jimenez, L. Alfredo

    2014-01-01

    Highlights: • Original short-term forecasting model for the hourly hydropower generation. • The use of NWP forecasts allows horizons of several days. • New variable to represent the capacity level for generating hydroelectric energy. • The proposed model significantly outperforms the persistence model. - Abstract: This paper presents an original short-term forecasting model of the hourly electric power production for aggregated regional hydropower generation. The inputs of the model are previously recorded values of the aggregated hourly production of hydropower plants and hourly water precipitation forecasts using Numerical Weather Prediction tools, as well as other hourly data (load demand and wind generation). This model is composed of three modules: the first one gives the prediction of the “monthly” hourly power production of the hydropower plants; the second module gives the prediction of hourly power deviation values, which are added to that obtained by the first module to achieve the final forecast of the hourly hydropower generation; the third module allows a periodic adjustment of the prediction of the first module to improve its BIAS error. The model has been applied successfully to the real-life case study of the short-term forecasting of the aggregated hydropower generation in Spain and Portugal (Iberian Peninsula Power System), achieving satisfactory results for the next-day forecasts. The model can be valuable for agents involved in electricity markets and useful for power system operations

  3. Performance assessment of deterministic and probabilistic weather predictions for the short-term optimization of a tropical hydropower reservoir

    Science.gov (United States)

    Mainardi Fan, Fernando; Schwanenberg, Dirk; Alvarado, Rodolfo; Assis dos Reis, Alberto; Naumann, Steffi; Collischonn, Walter

    2016-04-01

    Hydropower is the most important electricity source in Brazil. During recent years, it accounted for 60% to 70% of the total electric power supply. Marginal costs of hydropower are lower than for thermal power plants, therefore, there is a strong economic motivation to maximize its share. On the other hand, hydropower depends on the availability of water, which has a natural variability. Its extremes lead to the risks of power production deficits during droughts and safety issues in the reservoir and downstream river reaches during flood events. One building block of the proper management of hydropower assets is the short-term forecast of reservoir inflows as input for an online, event-based optimization of its release strategy. While deterministic forecasts and optimization schemes are the established techniques for the short-term reservoir management, the use of probabilistic ensemble forecasts and stochastic optimization techniques receives growing attention and a number of researches have shown its benefit. The present work shows one of the first hindcasting and closed-loop control experiments for a multi-purpose hydropower reservoir in a tropical region in Brazil. The case study is the hydropower project (HPP) Três Marias, located in southeast Brazil. The HPP reservoir is operated with two main objectives: (i) hydroelectricity generation and (ii) flood control at Pirapora City located 120 km downstream of the dam. In the experiments, precipitation forecasts based on observed data, deterministic and probabilistic forecasts with 50 ensemble members of the ECMWF are used as forcing of the MGB-IPH hydrological model to generate streamflow forecasts over a period of 2 years. The online optimization depends on a deterministic and multi-stage stochastic version of a model predictive control scheme. Results for the perfect forecasts show the potential benefit of the online optimization and indicate a desired forecast lead time of 30 days. In comparison, the use of

  4. Aspects if stochastic models for short-term hydropower scheduling and bidding

    Energy Technology Data Exchange (ETDEWEB)

    Belsnes, Michael Martin [Sintef Energy, Trondheim (Norway); Follestad, Turid [Sintef Energy, Trondheim (Norway); Wolfgang, Ove [Sintef Energy, Trondheim (Norway); Fosso, Olav B. [Dep. of electric power engineering NTNU, Trondheim (Norway)

    2012-07-01

    This report discusses challenges met when turning from deterministic to stochastic decision support models for short-term hydropower scheduling and bidding. The report describes characteristics of the short-term scheduling and bidding problem, different market and bidding strategies, and how a stochastic optimization model can be formulated. A review of approaches for stochastic short-term modelling and stochastic modelling for the input variables inflow and market prices is given. The report discusses methods for approximating the predictive distribution of uncertain variables by scenario trees. Benefits of using a stochastic over a deterministic model are illustrated by a case study, where increased profit is obtained to a varying degree depending on the reservoir filling and price structure. Finally, an approach for assessing the effect of using a size restricted scenario tree to approximate the predictive distribution for stochastic input variables is described. The report is a summary of the findings of Work package 1 of the research project #Left Double Quotation Mark#Optimal short-term scheduling of wind and hydro resources#Right Double Quotation Mark#. The project aims at developing a prototype for an operational stochastic short-term scheduling model. Based on the investigations summarized in the report, it is concluded that using a deterministic equivalent formulation of the stochastic optimization problem is convenient and sufficient for obtaining a working prototype. (author)

  5. Assessment of the economic impact of environmental constraints on short-term hydropower plant operation

    International Nuclear Information System (INIS)

    Perez-Diaz, Juan I.; Wilhelmi, Jose R.

    2010-01-01

    Environmental constraints imposed on hydropower plant operation are usually given in the form of minimum environmental flows and, in some cases, in the form of maximum and minimum rates of change of flows, or ramping rates. Environmental constraints reduce the amount of water available to produce electricity and limit the contribution of peak hydropower plants to adapting the power supply to the demand and to providing certain ancillary services to the electrical grid, such as spinning reserve or load-frequency control. The objective of this paper is to assess the economic impact of environmental constraints on short-term hydropower plant operation. For that purpose, a revenue-driven daily optimization model based on mixed integer linear programming is used. The model considers the head variation and its influence on the units' efficiency, as well as the option of starting-up or shutting-down the plant at any hour of the day, should it be advantageous, while releasing the environmental flow through the bottom outlets. In order to illustrate the applicability of the methodology, it is applied in a real hydropower plant under different operating conditions and environmental constraints. (author)

  6. Assessment of the economic impact of environmental constraints on short-term hydropower plant operation

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Diaz, Juan I.; Wilhelmi, Jose R. [Department of Hydraulic and Energy Engineering, Technical University of Madrid (UPM), c/Profesor Aranguren s/n, 28040 Madrid (Spain)

    2010-12-15

    Environmental constraints imposed on hydropower plant operation are usually given in the form of minimum environmental flows and, in some cases, in the form of maximum and minimum rates of change of flows, or ramping rates. Environmental constraints reduce the amount of water available to produce electricity and limit the contribution of peak hydropower plants to adapting the power supply to the demand and to providing certain ancillary services to the electrical grid, such as spinning reserve or load-frequency control. The objective of this paper is to assess the economic impact of environmental constraints on short-term hydropower plant operation. For that purpose, a revenue-driven daily optimization model based on mixed integer linear programming is used. The model considers the head variation and its influence on the units' efficiency, as well as the option of starting-up or shutting-down the plant at any hour of the day, should it be advantageous, while releasing the environmental flow through the bottom outlets. In order to illustrate the applicability of the methodology, it is applied in a real hydropower plant under different operating conditions and environmental constraints. (author)

  7. Optimal short-term operation schedule of a hydropower plant in a competitive electricity market

    International Nuclear Information System (INIS)

    Perez-Diaz, Juan I.; Wilhelmi, Jose R.; Arevalo, Luis A.

    2010-01-01

    This paper presents a dynamic programming model to solve the short-term scheduling problem of a hydropower plant that sells energy in a pool-based electricity market with the objective of maximizing the revenue. This is a nonlinear and non-concave problem subject to strong technical and strategic constraints, and in which discrete and continuous variables take part. The model described in this paper determines, in each hour of the planning horizon (typically from one day to one week), both the optimal number of units in operation (unit commitment) and the power to be generated by the committed units (generation dispatch). The power generated by each unit is considered as a nonlinear function of the actual water discharge and volume of the associated reservoir. The dependence of the units' efficiency and operating limits with the available gross head is also accounted for in this model. The application of this model to a real hydropower plant demonstrates its capabilities in providing the operation schedule that maximizes the revenue of the hydro plant while satisfying several constraints of different classes. In addition, the use of this model as a supporting tool to estimate the economic feasibility of a hydropower plant development project is also analyzed in the paper. (author)

  8. Hydrograph variances over different timescales in hydropower production networks

    Science.gov (United States)

    Zmijewski, Nicholas; Wörman, Anders

    2016-08-01

    The operation of water reservoirs involves a spectrum of timescales based on the distribution of stream flow travel times between reservoirs, as well as the technical, environmental, and social constraints imposed on the operation. In this research, a hydrodynamically based description of the flow between hydropower stations was implemented to study the relative importance of wave diffusion on the spectrum of hydrograph variance in a regulated watershed. Using spectral decomposition of the effluence hydrograph of a watershed, an exact expression of the variance in the outflow response was derived, as a function of the trends of hydraulic and geomorphologic dispersion and management of production and reservoirs. We show that the power spectra of involved time-series follow nearly fractal patterns, which facilitates examination of the relative importance of wave diffusion and possible changes in production demand on the outflow spectrum. The exact spectral solution can also identify statistical bounds of future demand patterns due to limitations in storage capacity. The impact of the hydraulic description of the stream flow on the reservoir discharge was examined for a given power demand in River Dalälven, Sweden, as function of a stream flow Peclet number. The regulation of hydropower production on the River Dalälven generally increased the short-term variance in the effluence hydrograph, whereas wave diffusion decreased the short-term variance over periods of white noise) as a result of current production objectives.

  9. Short-Term Planning of Hybrid Power System

    Science.gov (United States)

    Knežević, Goran; Baus, Zoran; Nikolovski, Srete

    2016-07-01

    In this paper short-term planning algorithm for hybrid power system consist of different types of cascade hydropower plants (run-of-the river, pumped storage, conventional), thermal power plants (coal-fired power plants, combined cycle gas-fired power plants) and wind farms is presented. The optimization process provides a joint bid of the hybrid system, and thus making the operation schedule of hydro and thermal power plants, the operation condition of pumped-storage hydropower plants with the aim of maximizing profits on day ahead market, according to expected hourly electricity prices, the expected local water inflow in certain hydropower plants, and the expected production of electrical energy from the wind farm, taking into account previously contracted bilateral agreement for electricity generation. Optimization process is formulated as hourly-discretized mixed integer linear optimization problem. Optimization model is applied on the case study in order to show general features of the developed model.

  10. Hydropower in Southeast United States, -a Hydroclimatological Perspective

    Science.gov (United States)

    Engstrom, J.

    2016-12-01

    Hydropower is unique among renewable energy sources for the ability to store its fuel (water) in reservoirs. The relationship between discharge, macro-scale drivers, and production is complex since production depends not only on water availability, but also upon decisions made by the institution owning the facility that has to consider many competing interests including economics, drinking water supply, recreational uses, etc. This analysis shows that the hydropower plants in Southeast U.S. (AL, GA, NC, SC, and TN) exhibit considerable year to year variability in production. Although the hydroclimatology of the Southeast U.S. has been analyzed partially, no previous study has linked the region's hydroelectricity production to any reported causes of interannual hydroclimatological variability, as has been completed in other regions. Due to the current short-term hydroelectricity production forecasts, the water resource is not optimized from a hydropower perspective as electricity generating potential is not maximized. The results of this study highlight the amount of untapped hydroelectricity that could be produced if long term hydroclimate and large-scale climate drivers were considered in production forecasts.

  11. Short-term optimal operation of Three-gorge and Gezhouba cascade hydropower stations in non-flood season with operation rules from data mining

    International Nuclear Information System (INIS)

    Ma Chao; Lian Jijian; Wang Junna

    2013-01-01

    Highlights: ► Short-term optimal operation of Three-gorge and Gezhouba hydropower stations was studied. ► Key state variable and exact constraints were proposed to improve numerical model. ► Operation rules proposed were applied in population initiation step for faster optimization. ► Culture algorithm with difference evolution was selected as optimization method. ► Model and method proposed were verified by case study with feasible operation solutions. - Abstract: Information hidden in the characteristics and relationship data of a cascade hydropower stations can be extracted by data-mining approaches to be operation rules and optimization support information. In this paper, with Three-gorge and Gezhouba cascade hydropower stations as an example, two operation rules are proposed due to different operation efficiency of water turbines and tight water volume and hydraulic relationship between two hydropower stations. The rules are applied to improve optimization model with more exact decision and state variables and constraints. They are also used in the population initiation step to develop better individuals with culture algorithm with differential evolution as an optimization method. In the case study, total feasible population and the best solution based on an initial population with an operation rule can be obtained with a shorter computation time than that of a pure random initiated population. Amount of electricity generation in a dispatch period with an operation rule also increases with an average increase rate of 0.025%. For a fixed water discharge process of Three-gorge hydropower station, there is a better rule to decide an operation plan of Gezhouba hydropower station in which total hydraulic head for electricity generation is optimized and distributed with inner-plant economic operation considered.

  12. Health implications of hydropower development

    International Nuclear Information System (INIS)

    Biswas, A.K.

    1982-01-01

    Hydropower development had been neglected in many countries during the past few decades, but the situation dramatically changed during the 1970s owing to the constantly increasing costs of electricity generation by fossil-fuel and nuclear power plants. Currently, hydroelectric generation accounts for approximately 23% of total global electricity supply. Much of the hydropower potential in developing countries of Africa, Asia and Latin America still remains to be exploited. Like any other source of energy, hydropower development has several health impacts. Conceptually, health implications of hydropower development can be divided into two broad categories: short-term and long-term problems. Short-term health impacts occur during the planning, construction and immediate post-construction phases, whereas long-term impacts stem from the presence of large man-made lakes, development of extensive canal systems, alteration of the ecosystem of the area, and changing socio-economic conditions. Longer-term impacts are further classified into two categories: introduction of new diseases and/or intensification of existing ones due to the improvements of the habitats of disease-carrying vectors, and health problems arising from resettlement of the people whose homes and land-holdings are inundated by the reservoirs. All these impacts are discussed in detail. Health impacts of hydropower developments have not yet been studied extensively. It is often implicitly assumed that health impacts of major dams are minor compared with other social and environmental impacts. Future studies could possibly reverse this assumption. (author)

  13. Balancing hydropower production and river bed incision in operating a run-of-river hydropower scheme along the River Po

    Science.gov (United States)

    Denaro, Simona; Dinh, Quang; Bizzi, Simone; Bernardi, Dario; Pavan, Sara; Castelletti, Andrea; Schippa, Leonardo; Soncini-Sessa, Rodolfo

    2013-04-01

    Water management through dams and reservoirs is worldwide necessary to support key human-related activities ranging from hydropower production to water allocation, and flood risk mitigation. Reservoir operations are commonly planned in order to maximize these objectives. However reservoirs strongly influence river geomorphic processes causing sediment deficit downstream, altering the flow regime, leading, often, to process of river bed incision: for instance the variations of river cross sections over few years can notably affect hydropower production, flood mitigation, water supply strategies and eco-hydrological processes of the freshwater ecosystem. The river Po (a major Italian river) has experienced severe bed incision in the last decades. For this reason infrastructure stability has been negatively affected, and capacity to derive water decreased, navigation, fishing and tourism are suffering economic damages, not to mention the impact on the environment. Our case study analyzes the management of Isola Serafini hydropower plant located on the main Po river course. The plant has a major impact to the geomorphic river processes downstream, affecting sediment supply, connectivity (stopping sediment upstream the dam) and transport capacity (altering the flow regime). Current operation policy aims at maximizing hydropower production neglecting the effects in term of geomorphic processes. A new improved policy should also consider controlling downstream river bed incision. The aim of this research is to find suitable modeling framework to identify an operating policy for Isola Serafini reservoir able to provide an optimal trade-off between these two conflicting objectives: hydropower production and river bed incision downstream. A multi-objective simulation-based optimization framework is adopted. The operating policy is parameterized as a piecewise linear function and the parameters optimized using an interactive response surface approach. Global and local

  14. MAXIMIZING HYDROPOWER PRODUCTION FROM RESERVOIRS:THE CASE STUDY OF MARKABA

    International Nuclear Information System (INIS)

    Jaafar, H.

    2014-01-01

    Hydropower is a form of renewable energy that is clean and cheap. Under uncertain climatic conditions, maximization of hydropower production becomes a challenging task.Stochastic Dynamic programming (SDP) is a promising optimization algorithm that is usedfor complex non-linear reservoir operational policies and strategies.In this research, a combined simulation-SDPoptimization model isdeveloped andverified for maximizing large-scale hydropower production in a monthly time step. The model isdeveloped to generate optimal operational policies for the Qarawn reservoir in Lebanon and test these policies in real time conditions. The model isused to derive operational regimes for the Qarawn reservoirunder varying flows using transitional probability matrices. Simulating the derived rules and the generated operational policies proved effective in maximizingthe hydropower production from the Markaba power plant. The model could be successfully applied to other hydropower dams in the region. (author)

  15. An Operational Short-Term Forecasting System for Regional Hydropower Management

    Science.gov (United States)

    Gronewold, A.; Labuhn, K. A.; Calappi, T. J.; MacNeil, A.

    2017-12-01

    The Niagara River is the natural outlet of Lake Erie and drains four of the five Great lakes. The river is used to move commerce and is home to both sport fishing and tourism industries. It also provides nearly 5 million kilowatts of hydropower for approximately 3.9 million homes. Due to a complex international treaty and the necessity of balancing water needs for an extensive tourism industry, the power entities operating on the river require detailed and accurate short-term river flow forecasts to maximize power output. A new forecast system is being evaluated that takes advantage of several previously independent components including the NOAA Lake Erie operational Forecast System (LEOFS), a previously developed HEC-RAS model, input from the New York Power Authority(NYPA) and Ontario Power Generation (OPG) and lateral flow forecasts for some of the tributaries provided by the NOAA Northeast River Forecast Center (NERFC). The Corps of Engineers updated the HEC-RAS model of the upper Niagara River to use the output forcing from LEOFS and a planned Grass Island Pool elevation provided by the power entities. The entire system has been integrated at the NERFC; it will be run multiple times per day with results provided to the Niagara River Control Center operators. The new model helps improve discharge forecasts by better accounting for dynamic conditions on Lake Erie. LEOFS captures seiche events on the lake that are often several meters of displacement from still water level. These seiche events translate into flow spikes that HEC-RAS routes downstream. Knowledge of the peak arrival time helps improve operational decisions at the Grass Island Pool. This poster will compare and contrast results from the existing operational flow forecast and the new integrated LEOFS/HEC-RAS forecast. This additional model will supply the Niagara River Control Center operators with multiple forecasts of flow to help improve forecasting under a wider variety of conditions.

  16. Hydropower in the Southeast: Balancing Lakeview and Production Optimization

    Science.gov (United States)

    Engstrom, J.

    2017-12-01

    Hydropower is the most important source of renewable electricity in Southeastern U.S. However, the region is repeatedly struck by droughts, and there are many conflicting interests in the limited water resource. This study takes a historical perspective and investigates how hydropower production patterns have changed over time, considering both natural drivers and human dimensions. Hydropower production is strongly tied to the natural variability of large-scale atmospheric drivers (teleconnections) as they affect the water availability in the whole river system and partly also the market demand. To balance the water resource between different interests is a complex task, and the conflicting interests vary by basin, sometimes over a relatively small geographic area. Here road networks adjacent to the hydropower reservoirs are used as an indicator of human development and recreational activities. Through a network analysis of the historical development of road networks surrounding the reservoir, the local and regional conflicting interests are identified and the influence on renewable electricity production quantified.

  17. Hydropower Modeling Challenges

    Energy Technology Data Exchange (ETDEWEB)

    Stoll, Brady [National Renewable Energy Lab. (NREL), Golden, CO (United States); Andrade, Juan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cohen, Stuart [National Renewable Energy Lab. (NREL), Golden, CO (United States); Brinkman, Greg [National Renewable Energy Lab. (NREL), Golden, CO (United States); Brancucci Martinez-Anido, Carlo [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-04-19

    Hydropower facilities are important assets for the electric power sector and represent a key source of flexibility for electric grids with large amounts of variable generation. As variable renewable generation sources expand, understanding the capabilities and limitations of the flexibility from hydropower resources is important for grid planning. Appropriately modeling these resources, however, is difficult because of the wide variety of constraints these plants face that other generators do not. These constraints can be broadly categorized as environmental, operational, and regulatory. This report highlights several key issues involving incorporating these constraints when modeling hydropower operations in terms of production cost and capacity expansion. Many of these challenges involve a lack of data to adequately represent the constraints or issues of model complexity and run time. We present several potential methods for improving the accuracy of hydropower representation in these models to allow for a better understanding of hydropower's capabilities.

  18. Influence of El Niño Southern Oscillation on global hydropower production

    Science.gov (United States)

    Ng, Jia Yi; Turner, Sean; Galelli, Stefano

    2016-04-01

    Hydropower contributes significantly to meeting the world's energy demand, accounting for at least 16% of total electrical output. Its role as a mature and cost competitive renewable energy source is expected to become increasingly important as the world transits to a low-carbon economy. A key component of hydropower production is runoff, which is highly dependent on precipitation and other climate variables. As such, it becomes critical to understand how the drivers of climate variability impact hydropower production. One globally-important driver is the El Niño Southern Oscillation (ENSO). While it is known that ENSO influences hydrological processes, the potential value of its associated teleconnection in design related tasks has yet to be explored at the global scale. Our work seeks to characterize the impact of ENSO on global hydropower production so as to quantify the potential for increased production brought about by incorporating climate information within reservoir operating models. We study over 1,500 hydropower reservoirs - representing more than half the world's hydropower capacity. A historical monthly reservoir inflow time series is assigned to each reservoir from a 0.5 degree gridded global runoff dataset. Reservoir operating rules are designed using stochastic dynamic programming, and storage dynamics are simulated to assess performance under the climate conditions of the 20th century. Results show that hydropower reservoirs in the United States, Brazil, Argentina, Australia, and Eastern China are strongly influenced by ENSO episodes. Statistically significant lag correlations between ENSO indicators and hydropower production demonstrate predictive skill with lead times up to several months. Our work highlights the potential for using these indicators to increase the contribution of existing hydropower plants to global energy supplies.

  19. Short-term robustness of production management systems

    NARCIS (Netherlands)

    Kleijnen, J.P.C.; Gaury, E.G.A.

    1998-01-01

    Short-term performance of a production management system for make-to-stock factories may be quantified through the service rate per shift; long-term performance through the average monthly work in process (WIP). This may yield, for example, that WIP is minimized, while the probability of the service

  20. Short-Term Robustness of Production Management Systems : New Methodology

    NARCIS (Netherlands)

    Kleijnen, J.P.C.; Gaury, E.G.A.

    2000-01-01

    This paper investigates the short-term robustness of production planning and control systems. This robustness is defined here as the systems ability to maintain short-term service probabilities (i.e., the probability that the fill rate remains within a prespecified range), in a variety of

  1. Hydropower Production and Fish Habitat Suitability: Impact and Effectiveness of Environmental Flow Prescriptions

    Science.gov (United States)

    Castellarin, A.; Galeati, G.; Ceola, S.; Pugliese, A.; Ventura, M.; Montanari, A.

    2017-12-01

    The anthropogenic alteration of the natural flow regime of a river for hydropower production can significantly modify the processes and functions associated with fluvial ecosystems. In order to preserve the fluvial habitat downstream of dams and diversion structures, environmental flows are commonly defined. Such environmental flows are generally computed from empirical methodologies, which are seldom based on site-specific studies, and may not be representative of local ecological and hydraulic conditions. Here we present the results of a quantitative analysis on the effectiveness of two alternative environmental flow scenarios prescribed in Central Italy (time-invariant experimental and empirically-based flow release versus time-variant hydrogeomorphologically-based flow release) and their impact on hydropower production and fish habitat suitability. The latter is examined by means of several models of habitat suitability curve, which is a well-known approach capable of analysing fluvial species preferences as a function of key eco-hydraulic features, such as water depth, flow velocity and river substrate. The results show an evident loss of hydropower production moving from the time-invariant experimental flow release to the hydrogeomorphological one (nearly 20% at the annual scale). Concerning the effects in terms of fish habitat suitability, our outcomes are less obvious, since they are species- and life stage-specific. The proposed analysis, which can be easily adapted to different riparian habitats and hydrological contexts, is a useful tool to guide the derivation of optimal water resource management strategies in order to ensure both hydropower production and fluvial ecosystem protection.

  2. Determining the effect of key climate drivers on global hydropower production

    Science.gov (United States)

    Galelli, S.; Ng, J. Y.; Lee, D.; Block, P. J.

    2017-12-01

    Accounting for about 17% of total global electrical power production, hydropower is arguably the world's main renewable energy source and a key asset to meet Paris climate agreements. A key component of hydropower production is water availability, which depends on both precipitation and multiple drivers of climate variability acting at different spatial and temporal scales. To understand how these drivers impact global hydropower production, we study the relation between four patterns of ocean-atmosphere climate variability (i.e., El Niño Southern Oscillation, Pacific Decadal Oscillation, North Atlantic Oscillation, and Atlantic Multidecadal Oscillation) and monthly time series of electrical power production for over 1,500 hydropower reservoirs—obtained via simulation with a high-fidelity dam model forced with 20th century climate conditions. Notably significant relationships between electrical power productions and climate variability are found in many climate sensitive regions globally, including North and South America, East Asia, West Africa, and Europe. Coupled interactions from multiple, simultaneous climate drivers are also evaluated. Finally, we highlight the importance of using these climate drivers as an additional source of information within reservoir operating rules where the skillful predictability of inflow exists.

  3. Geothermal and hydropower production in Iceland

    International Nuclear Information System (INIS)

    Rosa, D.J.

    1993-01-01

    This paper analyzes the impact of current and future development of geothermal and hydropower production on the economy of Iceland. Natural conditions in Iceland favor the increased utilization and development of both of these abundant power sources. The mean surface run-off in Iceland is about 50 l/s/km 2 (liters per second per square kilometer), with a large part of the country consisting of a plateau more than 400 meters above sea level. More than half of the country is above 500 meters above sea level. ne technically harnessable hydropower potential is estimated at 64 TWh/year (terawatthours per year), of which 30 TWh/year is considered economically and environmentally harnessable. In addition, Iceland has abundant geothermal energy sources. A quarter of the entire country is a volcanic area. Keeping in mind that geothermal resources are not strictly renewable, it is estimated that the potential power production from this source is 20 TWh/year. Present utilization of these two resources totals only 4.2 TWh/year, or only about 8% of Iceland's aggregate potential. There are many issues facing Iceland today as it considers development opportunities utilizing both of these abundant power supplies. This paper will first consider the technical aspects of both hydropower and geothermal power production in Iceland. Then, the economic consequences of alternative utilization of these energy sources will be evaluated. The first alternative to be considered will be the direct export of power by HVDC submarine cable to other countries, such as Scotland or the United Kingdom. Iceland could, as a second alterative, concentrate its efforts on bringing in energy intensive industries into the country

  4. The calculation interest for administration of hydropower in the long-term

    International Nuclear Information System (INIS)

    2005-01-01

    A review of important findings in newer, economic literature on discount rate in the long term is presented. Based on this review, two questions relating to the administration of Norwegian hydropower resources are briefly discussed. Firstly, which discount rate should be used as basis when valuating the existent Norwegian hydropower plants? Secondly, how should the socio-economic discount rate for investments in hydro projects be determined compared relatively to other types of investments in the power sector? The main conclusion is that the existing rate for administration of hydropower need not be substituted. Neither theory nor empiricism provides a conclusive answer. Certain relevant aspects that may be further investigated are put forth (ml)

  5. Impact of Alternative Environmental Flow Prescriptions on Hydropower Production and Fish Habitat Suitability

    Science.gov (United States)

    Castellarin, A.; Ceola, S.; Pugliese, A.; Galeati, G. A.

    2015-12-01

    Anthropogenic activities along streams and rivers are increasingly recognized to be a major concern for fluvial ecosystems. The management of water resources, by means of e.g. flow diversions and dams, for industrial, agricultural, water-supply, hydropower production and flood protection purposes induces significant changes to the natural streamflow regime of a river. Indeed, the river flow regime is known to be a major abiotic factor influencing fluvial ecosystems. An established approach aimed at preserving the behaviour and distribution of fluvial species relies on the definition of minimum streamflow requirements (i.e., environmental flows) downstream of dams and diversion structures. Such environmental flows are normally identified through methodologies that have an empirical nature and may not be representative of local ecological and hydraulic conditions. While the effect of imposing a minimum discharge release is easily predictable in terms of e.g. loss of hydropower production, the advantages in terms of species preferences are often poorly understood and seldom assessed. To analyze the interactions between flow releases and the behaviour and distribution of fluvial species (i.e., from periphyton, to benthic invertebrate and fish), one may use a habitat suitability curve, which is a fundamental tool capable of describing species preferences influenced by any generic environmental variable. The outcomes of a real case study applied to several Italian rivers, located in the Marche administrative district in Central Italy (∽10000km2), in which we quantitatively assess the effects of alternative environmental flow scenarios on the existing hydropower network and on two fish species that are quite abundant in the study area (i.e., Leuciscus cephalus cabeda and Barbus barbus plebejus), will be presented and discussed. The proposed analysis, which can be easily adapted to different riparian habitats and hydrological contexts, is a useful tool to guide the

  6. Hydropower

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2012-10-01

    Full Text Available Hydropower is currently the most common source of renewable energy, accounting for more than 3,400 terawatts, or about 16 percent of global electricity production, in 2010. As hydropower uses a fuel—water from the hydrologic cycle...

  7. Short-term generation scheduling model of Fujian hydro system

    Energy Technology Data Exchange (ETDEWEB)

    Wang Jinwen [School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China)], E-mail: dr.jinwen.wang@gmail.com

    2009-04-15

    The Fujian hydropower system (FHS) is one of the provincial hydropower systems with the most complicated hydraulic topology in China. This paper describes an optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to aid the shift engineers in making decisions with the short-term hydropower scheduling such that the generation benefit can be maximal. The problem involves 27 reservoirs and is formulated as a nonlinear and discrete programming. It is a very challenging task to solve such a large-scale problem. In this paper, the Lagrangian multipliers are introduced to decompose the primal problem into a hydro subproblem and many individual plant-based subproblems, which are respectively solved by the improved simplex-like method (SLM) and the dynamic programming (DP). A numerical example is given and the derived solution is very close to the optimal one, with the distance in benefit less than 0.004%. All the data needed for the numerical example are presented in detail for further tests and studies from more experts and researchers.

  8. Short-term generation scheduling model of Fujian hydro system

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Jinwen [School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2009-04-15

    The Fujian hydropower system (FHS) is one of the provincial hydropower systems with the most complicated hydraulic topology in China. This paper describes an optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to aid the shift engineers in making decisions with the short-term hydropower scheduling such that the generation benefit can be maximal. The problem involves 27 reservoirs and is formulated as a nonlinear and discrete programming. It is a very challenging task to solve such a large-scale problem. In this paper, the Lagrangian multipliers are introduced to decompose the primal problem into a hydro subproblem and many individual plant-based subproblems, which are respectively solved by the improved simplex-like method (SLM) and the dynamic programming (DP). A numerical example is given and the derived solution is very close to the optimal one, with the distance in benefit less than 0.004%. All the data needed for the numerical example are presented in detail for further tests and studies from more experts and researchers. (author)

  9. Evaluating the marginal utility principle for long-term hydropower scheduling

    International Nuclear Information System (INIS)

    Zhao, Tongtiegang; Zhao, Jianshi; Liu, Pan; Lei, Xiaohui

    2015-01-01

    Highlights: • Analysis of one-, two- and multi-period hydropower scheduling. • Derivation of marginal cost and marginal return of carry-over storage. • Evaluation of the marginal utility principle in a case study of the Three Gorges Reservoir. - Abstract: The conversion of the potential energy of dammed water into hydropower depends on both reservoir storage and release, which are the major difficulties in hydropower reservoir operation. This study evaluates the marginal utility principle, which determines the optimal carry-over storage between periods, for long-term hydropower scheduling. Increasing marginal cost and decreasing marginal return are two important characteristics that determine the marginal utility principle in water supply. However, the notion of decreasing marginal return is inapplicable in hydropower scheduling. Instead, the carry-over storage from one period has an increasing marginal contribution to the power generation in the next period. Although carry-over storage incurs an increasing marginal cost to the power generation in the current period, the marginal return is higher than the marginal cost. The marginal return from the carry-over storage further increases in the multi-period case. These findings suggest saving as much carry-over storage as possible, which is bounded by the operational constraints of storage capacity, environmental flow, and installed capacity in actual hydropower scheduling. The marginal utility principle is evaluated for a case study of the Three Gorges Reservoir, and the effects of the constraints are discussed. Results confirm the theoretical findings and show that the marginal return from carry-over storage is larger than the marginal cost. The operational constraints help determine the optimal carry-over storage.

  10. Verification of“Trend-Volatility Model”in Short-Term Forecast of Grain Production Potential

    Directory of Open Access Journals (Sweden)

    MI Chang-hong

    2016-02-01

    Full Text Available The "trend-volatility model" in short-term forecasting of grain production potential was verified and discussed systematically by using the grain production data from 1949 to 2014, in 16 typical counties and 6 typical districts, and 31 provinces, of China. The results showed as follows:(1 Size of forecast error reflected the precision of short-term production potential, the main reason of large prediction error was a great amount of high yield farmlands were occupied in developed areas and a great increase of vegetable and fruit planted that made grain yield decreased in a short time;(2 The micro-trend amendment method was a necessary part of "trend-volatility model", which could involve the short-term factors such as meteorological factors, science and technology input, social factors and other effects, while macro-trend prediction could not. Therefore, The micro-trend amendment method could improve the forecast precision.(3 In terms of actual situation in recent years in China, the more developed the areas was, the bigger the volatility of short-term production potential was; For the short-term production potential, the stage of increasing-decreasing-recovering also existed in developed areas;(4 In the terms of forecast precision of short-terms production potential, the scale of national was higher than the scale of province, the scale of province was higher than the scale of district, the scale of district was higher than the scale of county. And it was large differences in precision between different provinces, different districts and different counties respectively, which was concerned to the complementarity of domestic climate and the ability of the farmland resistance to natural disasters.

  11. Characterizing effects of hydropower plants on sub-daily flow regimes

    Science.gov (United States)

    Bejarano, María Dolores; Sordo-Ward, Álvaro; Alonso, Carlos; Nilsson, Christer

    2017-07-01

    A characterization of short-term changes in river flow is essential for understanding the ecological effects of hydropower plants, which operate by turning the turbines on or off to generate electricity following variations in the market demand (i.e., hydropeaking). The goal of our study was to develop an approach for characterizing the effects of hydropower plant operations on within-day flow regimes across multiple dams and rivers. For this aim we first defined ecologically meaningful metrics that provide a full representation of the flow regime at short time scales from free-flowing rivers and rivers exposed to hydropeaking. We then defined metrics that enable quantification of the deviation of the altered short-term flow regime variables from those of the unaltered state. The approach was successfully tested in two rivers in northern Sweden, one free-flowing and another regulated by cascades of hydropower plants, which were additionally classified based on their impact on short-term flows in sites of similar management. The largest differences between study sites corresponded to metrics describing sub-daily flow magnitudes such as amplitude (i.e., difference between the highest and the lowest hourly flows) and rates (i.e., rise and fall rates of hourly flows). They were closely followed by frequency-related metrics accounting for the numbers of within-day hourly flow patterns (i.e., rises, falls and periods of stability of hourly flows). In comparison, between-site differences for the duration-related metrics were smallest. In general, hydropeaking resulted in higher within-day flow amplitudes and rates and more but shorter periods of a similar hourly flow patterns per day. The impacted flow feature and the characteristics of the impact (i.e., intensity and whether the impact increases or decreases whatever is being described by the metric) varied with season. Our approach is useful for catchment management planning, defining environmental flow targets

  12. Long-term scheduling of large cascade hydropower stations in Jinsha River, China

    International Nuclear Information System (INIS)

    Wang, Chao; Zhou, Jianzhong; Lu, Peng; Yuan, Liu

    2015-01-01

    Highlights: • Proposing a Gaussian group selection strategy to overcome premature convergence. • Multi-population ant are developed to enhance the search ability. • Proposing a circulatory solution correction to handle constraints. • Numerical and real hydropower system simulation are used to verify its performance. • Compensation analysis has been done to large hydropower stations in Jinsha River. - Abstract: The Jinsha River is the third longest river in the world. It consists of four large hydropower stations with total installed capacity 42,960 MW lying on the upper stretches of the Yangtze River, which is the longest river in the word. Due to the great potential of large cascade hydropower stations on power generation, long-term scheduling of large cascade hydropower stations (LSLCHS) plays an important role in electrical power system. As more and more concentrations focused on the optimal operation of large cascade hydropower stations, the LSLCHS has been taken into a multi-dimensional, non-convex and non-linear optimization problem due to its complicated hydraulic connection relationships and varieties of complex constraints with considering its power generation, shipping and ecological characteristics. In order to solve this problem, a multi-population ant colony optimization for continuous domain (MACO R ) is proposed in this paper. A Gaussian group selection strategy is applied to overcome premature convergence and ants with different characteristics are employed to enhance search ability, and circulatory solution correction strategy is presented to handle outflow, water level and output constraints. Furthermore, the efficiency and stability of MACO R are verified by its more desirable results in comparison to other latest works in numerical simulation, and it can be a viable alternative for solving those complicated optimal problems. With the applications in hydropower operation, LSLCHS can obtain more power generation benefit than other

  13. Prediction of small hydropower plant power production in Himreen Lake dam (HLD using artificial neural network

    Directory of Open Access Journals (Sweden)

    Ali Thaeer Hammid

    2018-03-01

    Full Text Available In developing countries, the power production is properly less than the request of power or load, and sustaining a system stability of power production is a trouble quietly. Sometimes, there is a necessary development to the correct quantity of load demand to retain a system of power production steadily. Thus, Small Hydropower Plant (SHP includes a Kaplan turbine was verified to explore its applicability. This paper concentrates on applying on Artificial Neural Networks (ANNs by approaching of Feed-Forward, Back-Propagation to make performance predictions of the hydropower plant at the Himreen lake dam-Diyala in terms of net turbine head, flow rate of water and power production that data gathered during a research over a 10 year period. The model studies the uncertainties of inputs and output operation and there's a designing to network structure and then trained by means of the entire of 3570 experimental and observed data. Furthermore, ANN offers an analyzing and diagnosing instrument effectively to model performance of the nonlinear plant. The study suggests that the ANN may predict the performance of the plant with a correlation coefficient (R between the variables of predicted and observed output that would be higher than 0.96. Keywords: Himreen Lake Dam, Small Hydropower plants, Artificial Neural Networks, Feed forward-back propagation model, Generation system's prediction

  14. Defect production in simulated cascades: Cascade quenching and short-term annealing

    International Nuclear Information System (INIS)

    Heinisch, H.L.

    1983-01-01

    Defect production in displacement cascades in copper has been modeled using the MARLOWE code to generate cascades and the stochastic annealing code ALSOME to simulate cascade quenching and short-term annealing of isolated cascades. Quenching is accomplished by using exaggerated values for defect mobilities and for critical reaction distances in ALSOME for a very short time. The quenched cascades are then short-term annealed with normal parameter values. The quenching parameter values were empirically determined by comparison with results of resistivity measurements. Throughout the collisional, quenching and short-term annealing phases of cascade development, the high energy cascades continue to behave as a collection of independent lower energy lobes. For recoils above about 30 keV the total number of defects and the numbers of free defects scale with the damage energy. As the energy decreases from 30 keV, defect production varies with the changing nature of the cascade configuration, resulting in more defects per unit damage energy. The simulated annealing of a low fluence of interacting cascades revealed an interstitial shielding effect on depleted zones during Stage I recovery. (orig.)

  15. Renewable Energy Essentials: Hydropower

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    Hydropower is currently the most common form of renewable energy and plays an important part in global power generation. Worldwide hydropower produced 3 288 TWh, just over 16% of global electricity production in 2008, and the overall technical potential for hydropower is estimated to be more than 16 400 TWh/yr.

  16. Resource and utilization of Estonian hydropower

    International Nuclear Information System (INIS)

    Raesaar, P.

    2005-01-01

    An overview of the Estonian hydropower resources and their utilization at present as well as prospective for the future are presented in this paper. A short overview of advantages of small hydropower stations and related issues is given. Some technological aspects are treated briefly. (authors)

  17. Hydropower Production in Future Climate Scenarios; the Case for the Zambezi River

    Directory of Open Access Journals (Sweden)

    Byman H. Hamududu

    2016-06-01

    Full Text Available Climate change remains a threat to water resources projects in southern Africa where impacts resulting from changes in climate are projected to be negative and worse than in most other regions of the world. This work presents an assessment of the impacts of climate change on water resources and hydropower production potential in the Zambezi River Basin. Future climate scenarios projected through the five General Circulation Model (GCM outputs are used as input in the impact assessment. The future projected climate scenarios are downscaled to find local and regional changes, and used in the Hydrologiska Byråns Vattenbalansavdelning (HBV hydrological model to assess climate change impacts on water resources in the river basin. According to the simulations, air temperature and potential evaporation are projected to increase, while rainfall is projected to decrease. The Zambezi hydropower system is likely to be affected negatively as a result of future climate changes. Increasing air temperature leading to increased evaporation, and reduced rainfall, both contribute to a decrease in resulting river flows and increased reservoir evaporation. Consequently, the decrease in water resources will lead to decreased hydropower production potential, by 9% in 2020s, 18% in 2050s and 28% in 2080s in the hydropower system, for a medium emission scenario, A1B.

  18. Small Hydropower in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Hadjerioua, Boualem [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Johnson, Kurt [Telluride Energy, Telluride, CO (United States)

    2015-09-01

    Small hydropower, defined in this report as hydropower with a generating capacity of up to 10 MW typically built using existing dams, pipelines, and canals has substantial opportunity for growth. Existing small hydropower comprises about 75% of the current US hydropower fleet in terms of number of plants. The economic feasibility of developing new small hydropower projects has substantially improved recently, making small hydropower the type of new hydropower development most likely to occur. In 2013, Congress unanimously approved changes to simplify federal permitting requirements for small hydropower, lowering costs and reducing the amount of time required to receive federal approvals. In 2014, Congress funded a new federal incentive payment program for hydropower, currently worth approximately 1.5 cents/kWh. Federal and state grant and loan programs for small hydropower are becoming available. Pending changes in federal climate policy could benefit all renewable energy sources, including small hydropower. Notwithstanding remaining barriers, development of new small hydropower is expected to accelerate in response to recent policy changes.

  19. Short-term hydro generation scheduling of Xiluodu and Xiangjiaba cascade hydropower stations using improved binary-real coded bee colony optimization algorithm

    International Nuclear Information System (INIS)

    Lu, Peng; Zhou, Jianzhong; Wang, Chao; Qiao, Qi; Mo, Li

    2015-01-01

    Highlights: • STHGS problem is decomposed into two parallel sub-problems of UC and ELD. • Binary coded BCO is used to solve UC sub-problem with 0–1 discrete variables. • Real coded BCO is used to solve ELD sub-problem with continuous variables. • Some heuristic repairing strategies are designed to handle various constraints. • The STHGS of Xiluodu and Xiangjiaba cascade stations is solved by IB-RBCO. - Abstract: Short-term hydro generation scheduling (STHGS) of cascade hydropower stations is a typical nonlinear mixed integer optimization problem to minimize the total water consumption while simultaneously meeting the grid requirements and other hydraulic and electrical constraints. In this paper, STHGS problem is decomposed into two parallel sub-problems of unit commitment (UC) and economic load dispatch (ELD), and the methodology of improved binary-real coded bee colony optimization (IB-RBCO) algorithm is proposed to solve them. Firstly, the improved binary coded BCO is used to solve the UC sub-problem with 0–1 discrete variables, and the heuristic repairing strategy for unit state constrains is applied to generate the feasible unit commitment schedule. Then, the improved real coded BCO is used to solve the ELD sub-problem with continuous variables, and an effective method is introduced to handle various unit operation constraints. Especially, the new updating strategy of DE/best/2/bin method with dynamic parameter control mechanism is applied to real coded BCO to improve the search ability of IB-RBCO. Finally, to verify the feasibility and effectiveness of the proposed IB-RBCO method, it is applied to solve the STHGS problem of Xiluodu and Xiangjiaba cascaded hydropower stations, and the simulating results are compared with other intelligence algorithms. The simulation results demonstrate that the proposed IB-RBCO method can get higher-quality solutions with less water consumption and shorter calculating time when facing the complex STHGS problem

  20. Short-term Lost Productivity per Victim: Intimate Partner Violence, Sexual Violence, or Stalking.

    Science.gov (United States)

    Peterson, Cora; Liu, Yang; Kresnow, Marcie-Jo; Florence, Curtis; Merrick, Melissa T; DeGue, Sarah; Lokey, Colby N

    2018-05-15

    The purpose of this study is to estimate victims' lifetime short-term lost productivity because of intimate partner violence, sexual violence, or stalking. U.S. nationally representative data from the 2012 National Intimate Partner and Sexual Violence Survey were used to estimate a regression-adjusted average per victim (female and male) and total population number of cumulative short-term lost work and school days (or lost productivity) because of victimizations over victims' lifetimes. Victims' lost productivity was valued using a U.S. daily production estimate. Analysis was conducted in 2017. Non-institutionalized adults with some lifetime exposure to intimate partner violence, sexual violence, or stalking (n=6,718 respondents; survey-weighted n=130,795,789) reported nearly 741 million lost productive days because of victimizations by an average of 2.5 perpetrators per victim. The adjusted per victim average was 4.9 (95% CI=3.9, 5.9) days, controlling for victim, perpetrator, and violence type factors. The estimated societal cost of this short-term lost productivity was $730 per victim, or $110 billion across the lifetimes of all victims (2016 USD). Factors associated with victims having a higher number of lost days included a higher number of perpetrators and being female, as well as sexual violence, physical violence, or stalking victimization by an intimate partner perpetrator, stalking victimization by an acquaintance perpetrator, and sexual violence or stalking victimization by a family member perpetrator. Short-term lost productivity represents a minimum economic valuation of the immediate negative effects of intimate partner violence, sexual violence, and stalking. Victims' lost productivity affects family members, colleagues, and employers. Published by Elsevier Inc.

  1. Short-term hydro generation scheduling of Three Gorges–Gezhouba cascaded hydropower plants using hybrid MACS-ADE approach

    International Nuclear Information System (INIS)

    Mo, Li; Lu, Peng; Wang, Chao; Zhou, Jianzhong

    2013-01-01

    Highlights: • MACS and ADE algorithms are hybridized as MACS-ADE method for solving STHGS problem. • An adaptive mutation is integrated into the proposed algorithm to avoid premature convergence. • MACS and ADE are run in parallel in search of better solution. • Several effective heuristic strategies are designed for dealing with various constraints of STHGS problem. - Abstract: Short-term hydro generation scheduling (STHGS) aims at determining optimal hydro generation scheduling to obtain minimum water consumption for one day or week while meeting various system constraints. In this paper, the STHGS problem is decomposed into two sub-problems: (i) unit commitment (UC) sub-problem; (ii) economic load dispatch (ELD) sub-problem. Then, we present a hybrid algorithm based on multi ant colony system (MACS) and differential evolution (DE) for solving the STHGS problem. First, MACS is used for dealing with UC sub-problem. A set of cooperating ant colonies cooperate to choose the unit state over the scheduled time horizon. Then, the adaptive differential evolution (ADE) is used to solve ELD sub-problem. MACS and ADE are run in parallel with adjusting their solutions in search of a better solution. Meanwhile, local and global pheromone updating rules in MACS and adaptive dynamic parameter adjusting strategy in DE are applied for enhancing the search ability of MACS-ADE. Finally, the proposed method is implemented to solve STHGS problem of Three Gorges–Gezhouba cascaded hydropower plants to verify the feasibility and effectiveness. Compared with other established methods, the simulation results reveal that the proposed MACS-ADE approach has the best convergence property, computational efficiency with less water consumption

  2. Eddy covariance flux measurements confirm extreme CH4 emissions from a Swiss hydropower reservoir and resolve their short-term variability

    Directory of Open Access Journals (Sweden)

    S. Sobek

    2011-09-01

    Full Text Available Greenhouse gas budgets quantified via land-surface eddy covariance (EC flux sites differ significantly from those obtained via inverse modeling. A possible reason for the discrepancy between methods may be our gap in quantitative knowledge of methane (CH4 fluxes. In this study we carried out EC flux measurements during two intensive campaigns in summer 2008 to quantify methane flux from a hydropower reservoir and link its temporal variability to environmental driving forces: water temperature and pressure changes (atmospheric and due to changes in lake level. Methane fluxes were extremely high and highly variable, but consistently showed gas efflux from the lake when the wind was approaching the EC sensors across the open water, as confirmed by floating chamber flux measurements. The average flux was 3.8 ± 0.4 μg C m−2 s−1 (mean ± SE with a median of 1.4 μg C m−2 s−1, which is quite high even compared to tropical reservoirs. Floating chamber fluxes from four selected days confirmed such high fluxes with 7.4 ± 1.3 μg C m−2 s−1. Fluxes increased exponentially with increasing temperatures, but were decreasing exponentially with increasing atmospheric and/or lake level pressure. A multiple regression using lake surface temperatures (0.1 m depth, temperature at depth (10 m deep in front of the dam, atmospheric pressure, and lake level was able to explain 35.4% of the overall variance. This best fit included each variable averaged over a 9-h moving window, plus the respective short-term residuals thereof. We estimate that an annual average of 3% of the particulate organic matter (POM input via the river is sufficient to sustain these large CH4 fluxes. To compensate the global warming potential associated with the CH4 effluxes from this hydropower reservoir a 1.3 to 3.7 times larger terrestrial area with net carbon dioxide uptake is needed if a European-scale compilation of grasslands, croplands and forests is taken as reference. This

  3. Hydropower development in the Philippines

    International Nuclear Information System (INIS)

    Lopez, P.L.

    1997-01-01

    The present policy on energy development is geared towards harnessing renewable and indigenous energy resource which can offer clean, abundant and efficient power supply for the country. a review of the current generation mix of the power system, especially the Luzon grid will establish a high dependency in imported fuel - oil and coal to power our generating plants. Thus, the policy of reducing dependence on imported fuel will depend largely on the success of tapping the alternative renewable and indigenous sources. The sustainable development era of the 90's brought fresh interest on the performance and commercial viability of indigenous and/or renewable sources of energy such as wind, solar, geothermal, natural gas and water power or hydropower. Among these alternative renewable sources, water or hydropower is the most readily available, and will produce clean domestic source of electricity - no carbon dioxide, sulfur dioxide, nitrous oxide or any other air emissions. The potential is available in most parts of the country that are mountainous and have high rainfall. In terms of production, hydropower leads as the most developed and more proven in terms of commercial viability. It is also more reliable, efficient and less expensive than geothermal, biomass, wind and solar energy, as will be shown later. (author)

  4. Long-term stability analysis of the left bank abutment slope at Jinping I hydropower station

    OpenAIRE

    Zhang, Long; Yang, Qiang; Liu, Yaoru

    2016-01-01

    The time-dependent behavior of the left bank abutment slope at Jinping I hydropower station has a major influence on the normal operation and long-term safety of the hydropower station. To solve this problem, a geomechanical model containing various faults and weak structural planes is established, and numerical simulation is conducted under normal water load condition using FLAC3D, incorporating creep model proposed based on thermodynamics with internal state variables theory. The creep defo...

  5. Mini and micro hydropower systems in India

    International Nuclear Information System (INIS)

    Kothari, D.P.

    1992-01-01

    Hydropower is one of the renewable sources of energy. In the field of hydropower, even though small/mini/micro hydropower systems make fractional increases in the overall energy production, their impact on the local areas in which they are sited can be significant in stimulating growth of rural industry and in meeting the basic energy needs of the local population for domestic and agricultural use. They also help in reducing demand on other non-renewable polluting resources like fossil fuels. Moreover as compared to big hydropower systems, small hydropower systems are cost competitive and minimally disruptive to the environment. They require less time for construction and reduce transmission losses. They can be designed to suit the limits of water resources available and can be tailored to the needs of the end-use market. Aspects of small hydropower projects which needs to be studied are listed. Modelling of turbines and generators for such projects, and factors to be considered in selection of suitable turbine and generator for a particular small hydropower system are discussed. The technology for small hydropower systems is well developed and available in India. The present estimated potential of such systems in India is 5000 MW out of which 207 MW is harnessed. These small hydropower plants are mostly located in the northern states like Jammu and Kashmir, Uttar Pradesh, Punjab, and Rajasthan. Construction works for 234 MW at 88 sites are going on. During the 8th plan period, 218.5 MW is planned to be developed with an outlay of Rs. 548.25 crores. It is suggested that special subsidies and liberal term loans should be made available for implementing such systems. (M.G.B.). 8 refs., 2 tabs., 1 fig

  6. Effects of massive wind power integration on short-term water resource management in central Chile - a grid-wide study

    Science.gov (United States)

    Haas, J.; Olivares, M. A.; Palma, R.

    2013-12-01

    In central Chile, water from reservoirs and streams is mainly used for irrigation and power generation. Hydropower reservoirs operation is particularly challenging because: i) decisions at each plant impact the entire power system, and ii) the existence of large storage capacity implies inter-temporal ties. An Independent System Operator (ISO) decides the grid-wide optimal allocation of water for power generation, under irrigation-related constraints. To account for the long-term opportunity cost of water, a future cost function is determined and used in the short term planning. As population growth and green policies demand increasing levels of renewable energy in power systems, deployment of wind farms and solar plants is rising quickly. However, their power output is highly fluctuating on short time scales, affecting the operation of power plants, particularly those fast responding units as hydropower reservoirs. This study addresses these indirect consequences of massive introduction of green energy sources on reservoir operations. Short-term reservoir operation, under different wind penetration scenarios, is simulated using a replica of Chile's ISO's scheduling optimization tools. Furthermore, an ongoing study is exploring the potential to augment the capacity the existing hydro-power plants to better cope with the balancing needs due to a higher wind power share in the system. As reservoir releases determine to a great extent flows at downstream locations, hourly time series of turbined flows for 24-hour periods were computed for selected combinations between new wind farms and increased capacity of existing hydropower plants. These time series are compiled into subdaily hydrologic alteration (SDHA) indexes (Zimmerman et al, 2010). The resulting sample of indexes is then analyzed using duration curves. Results show a clear increase in the SDHA for every reservoir of the system as more fluctuating renewables are integrated into the system. High

  7. Minimizing water consumption when producing hydropower

    Science.gov (United States)

    Leon, A. S.

    2015-12-01

    In 2007, hydropower accounted for only 16% of the world electricity production, with other renewable sources totaling 3%. Thus, it is not surprising that when alternatives are evaluated for new energy developments, there is strong impulse for fossil fuel or nuclear energy as opposed to renewable sources. However, as hydropower schemes are often part of a multipurpose water resources development project, they can often help to finance other components of the project. In addition, hydropower systems and their associated dams and reservoirs provide human well-being benefits, such as flood control and irrigation, and societal benefits such as increased recreational activities and improved navigation. Furthermore, hydropower due to its associated reservoir storage, can provide flexibility and reliability for energy production in integrated energy systems. The storage capability of hydropower systems act as a regulating mechanism by which other intermittent and variable renewable energy sources (wind, wave, solar) can play a larger role in providing electricity of commercial quality. Minimizing water consumption for producing hydropower is critical given that overuse of water for energy production may result in a shortage of water for other purposes such as irrigation, navigation or fish passage. This paper presents a dimensional analysis for finding optimal flow discharge and optimal penstock diameter when designing impulse and reaction water turbines for hydropower systems. The objective of this analysis is to provide general insights for minimizing water consumption when producing hydropower. This analysis is based on the geometric and hydraulic characteristics of the penstock, the total hydraulic head and the desired power production. As part of this analysis, various dimensionless relationships between power production, flow discharge and head losses were derived. These relationships were used to withdraw general insights on determining optimal flow discharge and

  8. Short-term effects of dietary advanced glycation end products in rats

    DEFF Research Database (Denmark)

    Poulsen, Malene Wibe; Andersen, Jeanette Marker; Hedegaard, Rikke Susanne Vingborg

    2016-01-01

    Dietary advanced glycation end products (AGE) formed during heating of food have gained interest as potential nutritional toxins with adverse effects on inflammation and glucose metabolism. In the present study, we investigated the short-term effects of high and low molecular weight (HMW and LMW)...

  9. Technology Roadmap: Hydropower

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-01

    Hydropower could double its contribution by 2050, reaching 2,000 GW of global capacity and over 7,000 TWh. This achievement, driven primarily by the quest of clean electricity, could prevent annual emissions of up to 3 billion tonnes of CO2 from fossil-fuel plants. The bulk of this growth would come from large plants in emerging economies and developing countries. Hydroelectricity’s many advantages include reliability, proven technology, large storage capacity, and very low operating and maintenance costs. Hydropower is highly flexible, a precious asset for electricity network operators, especially given rapid expansion of variable generation from other renewable energy technologies such as wind power and photovoltaics. Many hydropower plants also provide flood control, irrigation, navigation and freshwater supply. The technology roadmap for Hydropower details action needed from policy makers to allow hydroelectric production to double, and addresses necessary conditions, including resolving environmental issues and gaining public acceptance.

  10. Alpine hydropower in a low carbon economy: Assessing the local implication of global policies

    Science.gov (United States)

    Anghileri, Daniela; Castelletti, Andrea; Burlando, Paolo

    2016-04-01

    In the global transition towards a more efficient and low-carbon economy, renewable energy plays a major role in displacing fossil fuels, meeting global energy demand while reducing carbon dioxide emissions. In Europe, Variable Renewable Sources (VRS), such as wind and solar power sources, are becoming a relevant share of the generation portfolios in many countries. Beside the indisputable social and environmental advantages of VRS, on the short medium term the VRS-induced lowering energy prices and increasing price's volatility might challenge traditional power sources and, among them, hydropower production, because of smaller incomes and higher maintenance costs associated to a more flexible operation of power systems. In this study, we focus on the Swiss hydropower sector analysing how different low-carbon targets and strategies established at the Swiss and European level might affect energy price formation and thus impact - through hydropower operation - water availability and ecosystems services at the catchment scale. We combine a hydrological model to simulate future water availability and an electricity market model to simulate future evolution of energy prices based on official Swiss and European energy roadmaps and CO2 price trends in the European Union. We use Multi-Objective optimization techniques to design alternative hydropower reservoir operation strategies, aiming to maximise the hydropower companies' income or to provide reliable energy supply with respect to the energy demand. This integrated model allows analysing to which extent global low-carbon policies impact reservoir operation at the local scale, and to gain insight on how to prioritise compensation measures and/or adaptation strategies to mitigate the impact of VRS on hydropower companies in increasingly water constrained settings. Numerical results are shown for a real-world case study in the Swiss Alps.

  11. The calculation interest for administration of hydropower in the long-term; Kalkulasjonsrenta for vannkraftforvaltning paa lang sikt

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    A review of important findings in newer, economic literature on discount rate in the long term is presented. Based on this review, two questions relating to the administration of Norwegian hydropower resources are briefly discussed. Firstly, which discount rate should be used as basis when valuating the existent Norwegian hydropower plants? Secondly, how should the socio-economic discount rate for investments in hydro projects be determined compared relatively to other types of investments in the power sector? The main conclusion is that the existing rate for administration of hydropower need not be substituted. Neither theory nor empiricism provides a conclusive answer. Certain relevant aspects that may be further investigated are put forth (ml)

  12. Hydropower

    DEFF Research Database (Denmark)

    Fenhann, Jørgen Villy; Kofoed, Jens Peter

    2010-01-01

    This chapter gives an overview of the various forms of hydropower: conventional hydropower, marine currents, tides, power from salinity gradients, ocean thermal energy conversion and wave power.......This chapter gives an overview of the various forms of hydropower: conventional hydropower, marine currents, tides, power from salinity gradients, ocean thermal energy conversion and wave power....

  13. Biofuel Crops Expansion: Evaluating the Impact on the Agricultural Water Scarcity Costs and Hydropower Production with Hydro Economic Modeling

    Science.gov (United States)

    Marques, G.

    2015-12-01

    Biofuels such as ethanol from sugar cane remain an important element to help mitigate the impacts of fossil fuels on the atmosphere. However, meeting fuel demands with biofuels requires technological advancement for water productivity and scale of production. This may translate into increased water demands for biofuel crops and potential for conflicts with incumbent crops and other water uses including domestic, hydropower generation and environmental. It is therefore important to evaluate the effects of increased biofuel production on the verge of water scarcity costs and hydropower production. The present research applies a hydro-economic optimization model to compare different scenarios of irrigated biofuel and hydropower production, and estimates the potential tradeoffs. A case study from the Araguari watershed in Brazil is provided. These results should be useful to (i) identify improved water allocation among competing economic demands, (ii) support water management and operations decisions in watersheds where biofuels are expected to increase, and (iii) identify the impact of bio fuel production in the water availability and economic value. Under optimized conditions, adoption of sugar cane for biofuel production heavily relies on the opportunity costs of other crops and hydropower generation. Areas with a lower value crop groups seem more suitable to adopt sugar cane for biofuel when the price of ethanol is sufficiently high and the opportunity costs of hydropower productions are not conflicting. The approach also highlights the potential for insights in water management from studying regional versus larger scales bundled systems involving water use, food production and power generation.

  14. Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China

    Directory of Open Access Journals (Sweden)

    Xinshuo Zhang

    2018-04-01

    Full Text Available How to effectively use clean renewable energy to improve the capacity of the power grid to absorb new energy and optimize the power grid structure has become one of China’s current issues. The Yalong River Wind-PV-Hydro complementary clean energy base was chosen as the research object from which to analyze the output complementarity principle and characteristics of wind farms, photovoltaic power plants, and hydropower stations. Then, an optimization scheduling model was established with the objective of minimizing the amount of abandoned wind and photovoltaic power and maximizing the stored energy in cascade hydropower stations. A Progress Optimality Algorithm (POA was used for the short-term optimal operation of Wind-PV-Hydro combinations. The results show that use of cascaded hydropower storage capacity can compensate for large-scale wind power and photovoltaic power, provide a relatively sustained and stable power supply for the grid. Wind-PV-Hydro complementary operation not only promotes wind power and photovoltaic power consumption but also improves the efficiency of using the original transmission channel of hydropower. This is of great significance to many developing countries in formatting a new green approach, realizing low-carbon power dispatch and trade and promoting regional economic development.

  15. Hydropower's future, the environment, and global electricity systems

    Energy Technology Data Exchange (ETDEWEB)

    Sternberg, R. [Department of Earth and Environmental Studies, Montclair State University, 1 Normal Ave, Montclair, NJ 07043-1624 (United States)

    2010-02-15

    Hydropower is a well established electricity system on the global scene. Global electricity needs by far exceed the amount of electricity that hydrosystems can provide to meet global electricity needs. Much of the world's hydropower remains to be brought into production. Improved technology, better calibrated environmental parameters for large projects have become the norm in the past 15 years. How and why does hydropower retain a prominent role in electricity production? How and why does hydropower find social acceptance in diverse social systems? How does hydropower project planning address issues beyond electricity generation? How does the systems approach to hydropower installations further analysis of comparative energy sources powering electricity systems? Attention to the environmental impact of hydropower facilities forms an integral part of systems analysis. Similarly, the technical, political and economic variables call for balanced analysis to identify the viability status of hydro projects. Economic competition among energy systems requires in context assessments as these shape decision making in planning of hydropower systems. Moreover, technological change has to be given a time frame during which the sector advances in productivity and share in expanding electricity generation. The low production costs per kWh assure hydropower at this juncture, 2009, a very viable future. (author)

  16. Climate Risk in Southern and Eastern Africa's Hydropower Generation

    Science.gov (United States)

    Dalin, C.; Conway, D.; Landman, W.; Osborn, T.

    2016-12-01

    Hydropower comprises a major proportion of electricity production in southern and eastern Africa and is undergoing rapid expansion. Hydropower production in both regions is exposed to high levels of climate variability and regional linkages are strong, yet an understanding of aggregate climate risk is lacking. Here we map regions of coherent precipitation variability with current and planned (2030) hydropower sites, river basin configuration and regional energy grids to assess aggregate exposure to hydropower supply disruption. If fully implemented hydropower will be increasingly concentrated in the Nile basin in eastern Africa and the Zambezi basin in southern Africa. Regions of similar rainfall variability show close alignment with the main sites of hydropower. Future concentration of hydropower will greatly increase the concurrent risk of climate related electricity supply disruption. Nascent electricity sharing mechanisms could mitigate risk but face considerable political and infrastructural challenges.

  17. Perspectives for hydropower stations in Switzerland: long-term competitiveness and possibilities for improvement

    International Nuclear Information System (INIS)

    Filippini, M.; Banfi, S.; Luchsinger, C.; Wild, J.; Balmer, M.; Grand, D.; Henkels, L.; Semadeni, M.; Gnansounou, E.

    2001-01-01

    This first general study - which has the character of a preliminary study - examines the questions if the liberalisation of the electricity market will have a negative effect on the competitiveness of hydropower in the long-term and what measures can be taken against such effects. Long-term competitiveness is defined as the ability of a business in this sector to make investments in renewal in the long-term, i.e. after its concessions have expired. The three main aims of the study are: 1. Assessment of the long-term competitiveness of the sector and identification of the factors which could either have a negative effect on it or improve it, 2. Analysis of cost structures and presentation of measures through which the long-term competitiveness of the sector can be reinforced, 3. Presentation of possible political measures to be taken in this business area in order to improve the long-term competitiveness of hydropower stations. The study identifies the most important factors that determine future competitiveness as being the market prices for electricity and capital costs (depreciation and interest on own and borrowed capital). Further, water fees, taxes and regulations concerning residual water flow can be of great importance for investment decisions, in particular for those enterprises that operate close to their profitability limits. The results of the analysis indicate that, in the future, a considerable number of enterprises must be reckoned with that will refrain from renewing their plant. Such outcomes depend, of course, on developments in electricity market prices, specific investment costs, rates of interest and other economic, political, and legal conditions. Making a prognosis about the development of such parameters is linked with a high degree of uncertainty. By means of sensitivity calculations and the definition of various scenarios, attempts are made to take these uncertainties into account . Finally, the study makes reference to the fact that

  18. Defect production in simulated cascades: cascade quenching and short-term annealing

    International Nuclear Information System (INIS)

    Heinisch, H.L.

    1982-01-01

    Defect production in high energy displacement cascades has been modeled using the computer code MARLOWE to generate the cascades and the stochastic computer code ALSOME to simulate the cascade quenching and short-term annealing of isolated cascades. The quenching is accomplished by using ALSOME with exaggerated values for defect mobilities and critical reaction distanes for recombination and clustering, which are in effect until the number of defect pairs is equal to the value determined from resistivity experiments at 4K. Then normal mobilities and reaction distances are used during short-term annealing to a point representative of Stage III recovery. Effects of cascade interactions at low fluences are also being investigated. The quenching parameter values were empirically determined for 30 keV cascades. The results agree well with experimental information throughout the range from 1 keV to 100 keV. Even after quenching and short-term annealing the high energy cascades behave as a collection of lower energy subcascades and lobes. Cascades generated in a crystal having thermal displacements were found to be in better agreement with experiments after quenching and annealing than those generated in a non-thermal crystal

  19. Functional Trait Changes, Productivity Shifts and Vegetation Stability in Mountain Grasslands during a Short-Term Warming.

    Science.gov (United States)

    Debouk, Haifa; de Bello, Francesco; Sebastià, Maria-Teresa

    2015-01-01

    Plant functional traits underlie vegetation responses to environmental changes such as global warming, and consequently influence ecosystem processes. While most of the existing studies focus on the effect of warming only on species diversity and productivity, we further investigated (i) how the structure of community plant functional traits in temperate grasslands respond to experimental warming, and (ii) whether species and functional diversity contribute to a greater stability of grasslands, in terms of vegetation composition and productivity. Intact vegetation turves were extracted from temperate subalpine grassland (highland) in the Eastern Pyrenees and transplanted into a warm continental, experimental site in Lleida, in Western Catalonia (lowland). The impacts of simulated warming on plant production and diversity, functional trait structure, and vegetation compositional stability were assessed. We observed an increase in biomass and a reduction in species and functional diversity under short-term warming. The functional structure of the grassland communities changed significantly, in terms of functional diversity and community-weighted means (CWM) for several traits. Acquisitive and fast-growing species with higher SLA, early flowering, erect growth habit, and rhizomatous strategy became dominant in the lowland. Productivity was significantly positively related to species, and to a lower extent, functional diversity, but productivity and stability after warming were more dependent on trait composition (CWM) than on diversity. The turves with more acquisitive species before warming changed less in composition after warming. Results suggest that (i) the short-term warming can lead to the dominance of acquisitive fast growing species over conservative species, thus reducing species richness, and (ii) the functional traits structure in grassland communities had a greater influence on the productivity and stability of the community under short-term warming

  20. Functional Trait Changes, Productivity Shifts and Vegetation Stability in Mountain Grasslands during a Short-Term Warming.

    Directory of Open Access Journals (Sweden)

    Haifa Debouk

    Full Text Available Plant functional traits underlie vegetation responses to environmental changes such as global warming, and consequently influence ecosystem processes. While most of the existing studies focus on the effect of warming only on species diversity and productivity, we further investigated (i how the structure of community plant functional traits in temperate grasslands respond to experimental warming, and (ii whether species and functional diversity contribute to a greater stability of grasslands, in terms of vegetation composition and productivity. Intact vegetation turves were extracted from temperate subalpine grassland (highland in the Eastern Pyrenees and transplanted into a warm continental, experimental site in Lleida, in Western Catalonia (lowland. The impacts of simulated warming on plant production and diversity, functional trait structure, and vegetation compositional stability were assessed. We observed an increase in biomass and a reduction in species and functional diversity under short-term warming. The functional structure of the grassland communities changed significantly, in terms of functional diversity and community-weighted means (CWM for several traits. Acquisitive and fast-growing species with higher SLA, early flowering, erect growth habit, and rhizomatous strategy became dominant in the lowland. Productivity was significantly positively related to species, and to a lower extent, functional diversity, but productivity and stability after warming were more dependent on trait composition (CWM than on diversity. The turves with more acquisitive species before warming changed less in composition after warming. Results suggest that (i the short-term warming can lead to the dominance of acquisitive fast growing species over conservative species, thus reducing species richness, and (ii the functional traits structure in grassland communities had a greater influence on the productivity and stability of the community under short-term

  1. Hydropower externalities: A meta-analysis

    International Nuclear Information System (INIS)

    Mattmann, Matteo; Logar, Ivana; Brouwer, Roy

    2016-01-01

    This paper presents a meta-analysis of existing research related to the economic valuation of the external effects of hydropower. A database consisting of 81 observations derived from 29 studies valuing the non-market impacts of hydropower electricity generation is constructed with the main aim to quantify and explain the economic values for positive and negative hydropower externalities. Different meta-regression model specifications are used to test the robustness of significant determinants of non-market values, including different types of hydropower impacts. The explanatory and predictive power of the estimated models is relatively high. Whilst controlling for sample and study characteristics, we find significant evidence for public aversion towards deteriorations of landscape, vegetation and wildlife caused by hydropower projects. There is however only weak evidence of willingness to pay for mitigating these effects. The main positive externality of hydropower generation, the avoidance of greenhouse gas emission, positively influences welfare estimates when combined with the share of hydropower in national energy production. Sensitivity to scope is detected, but not linked to specific externalities or non-market valuation methods. - Highlights: • A global meta-analysis of valuation studies of hydropower externalities is presented. • Positive and negative externalities are distinguished. • Welfare losses due to environmental deteriorations outweigh gains of GHG reductions. • There is only weak evidence of public WTP for mitigating negative externalities. • The non-market values of hydropower externalities are sensitive to scope.

  2. Short-term to seasonal variability in factors driving primary productivity in a shallow estuary: Implications for modeling production

    Science.gov (United States)

    Canion, Andy; MacIntyre, Hugh L.; Phipps, Scott

    2013-10-01

    The inputs of primary productivity models may be highly variable on short timescales (hourly to daily) in turbid estuaries, but modeling of productivity in these environments is often implemented with data collected over longer timescales. Daily, seasonal, and spatial variability in primary productivity model parameters: chlorophyll a concentration (Chla), the downwelling light attenuation coefficient (kd), and photosynthesis-irradiance response parameters (Pmchl, αChl) were characterized in Weeks Bay, a nitrogen-impacted shallow estuary in the northern Gulf of Mexico. Variability in primary productivity model parameters in response to environmental forcing, nutrients, and microalgal taxonomic marker pigments were analysed in monthly and short-term datasets. Microalgal biomass (as Chla) was strongly related to total phosphorus concentration on seasonal scales. Hourly data support wind-driven resuspension as a major source of short-term variability in Chla and light attenuation (kd). The empirical relationship between areal primary productivity and a combined variable of biomass and light attenuation showed that variability in the photosynthesis-irradiance response contributed little to the overall variability in primary productivity, and Chla alone could account for 53-86% of the variability in primary productivity. Efforts to model productivity in similar shallow systems with highly variable microalgal biomass may benefit the most by investing resources in improving spatial and temporal resolution of chlorophyll a measurements before increasing the complexity of models used in productivity modeling.

  3. Using Conventional Hydropower to Help Alleviate Variable Resource Grid Integration Challenges in the Western U.S

    Science.gov (United States)

    Veselka, T. D.; Poch, L.

    2011-12-01

    currently being studied. Typically these studies consider the inherent flexibility of hydropower technologies, but tend to fall short on details regarding grid operations, institutional arrangements, and hydropower environmental regulations. This presentation will focus on an analysis that Argonne National Laboratory is conducting in collaboration with the Western Area Power Administration (Western). The analysis evaluates the extent to which Western's hydropower resources may help with grid integration challenges via a proposed Energy Imbalance Market. This market encompasses most of the Western Electricity Coordinating Council footprint. It changes grid operations such that the real-time dispatch would be, in part, based on a 5-minute electricity market. The analysis includes many factors such as site-specific environmental considerations at each of its hydropower facilities, long-term firm purchase agreements, and hydropower operating objectives and goals. Results of the analysis indicate that site-specific details significantly affect the ability of hydropower plant to respond to grid needs in a future which will have a high penetration of variable resources.

  4. Ensemble hydro-meteorological forecasting for early warning of floods and scheduling of hydropower production

    Science.gov (United States)

    Solvang Johansen, Stian; Steinsland, Ingelin; Engeland, Kolbjørn

    2016-04-01

    on where they are situated and the hydrological regime. There is an improvement in CRPS for all catchments compared to raw EPS ensembles. The improvement is up to lead-time 5-7. The postprocessing also improves the MAE for the median of the predictive PDF compared to the median of the raw EPS. But less compared to CRPS, often up to lead-time 2-3. The streamflow ensembles are to some extent used operationally in Statkraft Energi (Hydro Power company, Norway), with respect to early warning, risk assessment and decision-making. Presently all forecast used operationally for short-term scheduling are deterministic, but ensembles are used visually for expert assessment of risk in difficult situations where e.g. there is a chance of overflow in a reservoir. However, there are plans to incorporate ensembles in the daily scheduling of hydropower production.

  5. Is the economic value of hydrological forecasts related to their quality? Case study of the hydropower sector.

    Science.gov (United States)

    Cassagnole, Manon; Ramos, Maria-Helena; Thirel, Guillaume; Gailhard, Joël; Garçon, Rémy

    2017-04-01

    The improvement of a forecasting system and the evaluation of the quality of its forecasts are recurrent steps in operational practice. However, the evaluation of forecast value or forecast usefulness for better decision-making is, to our knowledge, less frequent, even if it might be essential in many sectors such as hydropower and flood warning. In the hydropower sector, forecast value can be quantified by the economic gain obtained with the optimization of operations or reservoir management rules. Several hydropower operational systems use medium-range forecasts (up to 7-10 days ahead) and energy price predictions to optimize hydropower production. Hence, the operation of hydropower systems, including the management of water in reservoirs, is impacted by weather, climate and hydrologic variability as well as extreme events. In order to assess how the quality of hydrometeorological forecasts impact operations, it is essential to first understand if and how operations and management rules are sensitive to input predictions of different quality. This study investigates how 7-day ahead deterministic and ensemble streamflow forecasts of different quality might impact the economic gains of energy production. It is based on a research model developed by Irstea and EDF to investigate issues relevant to the links between quality and value of forecasts in the optimisation of energy production at the short range. Based on streamflow forecasts and pre-defined management constraints, the model defines the best hours (i.e., the hours with high energy prices) to produce electricity. To highlight the link between forecasts quality and their economic value, we built several synthetic ensemble forecasts based on observed streamflow time series. These inputs are generated in a controlled environment in order to obtain forecasts of different quality in terms of accuracy and reliability. These forecasts are used to assess the sensitivity of the decision model to forecast quality

  6. Hydro-power: a long history, a bright future

    Energy Technology Data Exchange (ETDEWEB)

    Deudney, D

    1981-07-01

    A brief history of the spread of hydro-power in the world was given. Tables showing hydro-power potential and use, and the % electricity from hydro-power for 13 countries were included along with a graph showing % hydro-power operating, planned and under construction by region. The need for committed and farsighted political leadership for future development and the possibility of hydro production reaching 4 to 6 times its present level were discussed.

  7. Organizing Environmental Flow Frameworks to Meet Hydropower Mitigation Needs

    Science.gov (United States)

    McManamay, Ryan A.; Brewer, Shannon K.; Jager, Henriette I.; Troia, Matthew J.

    2016-09-01

    The global recognition of the importance of natural flow regimes to sustain the ecological integrity of river systems has led to increased societal pressure on the hydropower industry to change plant operations to improve downstream aquatic ecosystems. However, a complete reinstatement of natural flow regimes is often unrealistic when balancing water needs for ecosystems, energy production, and other human uses. Thus, stakeholders must identify a prioritized subset of flow prescriptions that meet ecological objectives in light of realistic constraints. Yet, isolating aspects of flow regimes to restore downstream of hydropower facilities is among the greatest challenges of environmental flow science due, in part, to the sheer volume of available environmental flow tools in conjunction with complex negotiation-based regulatory procedures. Herein, we propose an organizational framework that structures information and existing flow paradigms into a staged process that assists stakeholders in implementing environmental flows for hydropower facilities. The framework identifies areas where regulations fall short of the needed scientific process, and provide suggestions for stakeholders to ameliorate those situations through advanced preparation. We highlight the strengths of existing flow paradigms in their application to hydropower settings and suggest when and where tools are most applicable. Our suggested framework increases the effectiveness and efficiency of the e-flow implementation process by rapidly establishing a knowledge base and decreasing uncertainty so more time can be devoted to filling knowledge gaps. Lastly, the framework provides the structure for a coordinated research agenda to further the science of environmental flows related to hydropower environments.

  8. Vulnerability of hydropower generation to climate change in China: Results based on Grey forecasting model

    International Nuclear Information System (INIS)

    Wang, Bing; Liang, Xiao-Jie; Zhang, Hao; Wang, Lu; Wei, Yi-Ming

    2014-01-01

    This paper analyzes the long-term relationships between hydropower generation and climate factors (precipitation), hydropower generation capacity (installed capacity of hydropower station) to quantify the vulnerability of renewable energy production in China for the case of hydropower generation. Furthermore, this study applies Grey forecasting model to forecast precipitation in different provinces, and then sets up different scenarios for precipitation based on the IPCC Special Report on Emission Scenarios and results from PRECIS (Providing Regional Climate projections for Impacts Studies) model. The most important result found in this research is the increasing hydropower vulnerability of the poorest regions and the main hydropower generation provinces of China to climate change. Other main empirical results reveal that the impacts of climate change on the supply of hydropower generation in China will be noteworthy for the society. Different scenarios have different effects on hydropower generation, of which A2 scenario (pessimistic, high emission) has the largest. Meanwhile, the impacts of climate change on hydropower generation of every province are distinctly different, of which the Southwest part has the higher vulnerability than the average level while the central part lower. - Highlights: • The hydropower vulnerability will be enlarged with the rapid increase of hydropower capacity. • Modeling the vulnerability of hydropower in different scenarios and different provinces. • The increasing hydropower vulnerability of the poorest regions to climate change. • The increasing hydropower vulnerability of the main hydropower generation provinces. • Rainfall pattern caused by climate change would be the reason for the increasing vulnerability

  9. The Ukrainian Hydropower Industry from the Standpoint of the Social Welfare Function

    Directory of Open Access Journals (Sweden)

    Skrypnyk Andrii V.

    2017-09-01

    Full Text Available In the pre-nuclear era the contribution of the hydropower industry to the energy balance of the former USSR was considered undeniable. At the same time, accompanying negative effects (flooding of large areas, destruction of populated areas, violation of historical monuments, destruction of fish resources, growth of risks of man-made disasters were not taken into account when creating reservoirs on flat terrain. Over time, as the main equipment (turbines, power generators and the associated infrastructure (locks and their equipment depreciates, the generation of hydroelectric power decreases both in absolute and relative terms, and the reservoir dams become an insurmountable barrier to river navigation. The main problems of hydropower engineering in terms of economic, ecological and technogenic risks are considered. For comparison, the forecast volumes of electric power production using renewable sources and hydropower are presented. The losses from the operation of the cascade of the Dnieper reservoirs are estimated.

  10. Development potential for hydropower

    International Nuclear Information System (INIS)

    Laufer, F.; Groetzinger, S.; Peter, M.; Schmutz, A.

    2004-11-01

    This comprehensive report for the Swiss Federal Office of Energy (SFOE) takes a look at the potential for the development of hydropower in Switzerland. The report updates the energy perspectives made ten years earlier. An overview of Swiss electricity production and consumption is presented and the proportion provided by hydropower is noted. Figures on installed capacity and import/export quantities are presented and discussed. Technological developments and the economical frameworks involved are discussed, as are regulatory measures that can be taken. Theoretical and technically realisable potentials for increased use of hydropower are discussed. The methods used to do this are examined. Strategies and measures to be taken are listed and discussed. An appendix includes data sheets on power plant modelling, including examples

  11. Short term forecasting of petroleum product demand in France

    International Nuclear Information System (INIS)

    Cadren, M.

    1998-01-01

    The analysis of petroleum product demand became a privileged thrust of research following the modifications in terms of structure and level of the petroleum markets since eighties. The greatest importance to econometrics models of Energy demand, joint works about nonstationary data, explained the development of error-correction models and the co-integration. In this context, the short term econometrics modelling of petroleum product demand does not only focus on forecasts but also on the measure of the gain acquired from using error-correction techniques and co-integration. It's filling to take the influence of technical improvement and environment pressures into account in econometrics modelling of petroleum products demand. The first part presents the evolution of Energy Demand in France and more particularly the petroleum product demand since 1986. The objective is to determine the main characteristics of each product, which will help us to analyse and validate the econometrics models. The second part focus on the recent developments in times series modelling. We study the problem of nonstationary data and expose different unit root tests. We examine the main approaches to univariate and multivariate modelling with nonstationary data and distinguish the forecasts of the latter's. The third part is intended to applications; its objective is to illustrate the theoretic developments of the second part with a comparison between the performances of different approaches (approach Box and Jenkins, Johansen approach's and structural approach). The models will be applied to the main French petroleum market. The observed asymmetrical demand behaviour is also considered. (author)

  12. Norway as a Battery for the Future European Power System—Impacts on the Hydropower System

    Directory of Open Access Journals (Sweden)

    Ingeborg Graabak

    2017-12-01

    Full Text Available Future power production in Europe is expected to include large shares of variable wind and solar power production. Norway, with approximately half of the hydropower reservoir capacity in Europe, can contribute to balance the variability. The aim of this paper is to assess how such a role may impact the Norwegian hydropower system in terms of production pattern of the plants, changes in reservoir level and water values. The study uses a stochastic optimization and simulation model and analyses an eHighway2050 scenario combined with increases in the hydropower production capacities in Norway. The capacity increases from ca. 31 GW in the present system to 42 and 50 GW respectively. The study uses 75 years with stochastic wind, solar radiation, temperature and inflow data. The results show that the hydropower system is able to partly balance the variable production and significantly reduce the power prices for the analyzed case. The paper shows that some of the power plants utilize their increased capacity, while other plants do not due to hydrological constraints and model limitations. The paper discusses how the modelling can be further improved in order to quantify more of the potential impacts on the future power system.

  13. Hydropower Impacts on Electrical System Production Costs in the Southwest United States

    Directory of Open Access Journals (Sweden)

    Dominique M. Bain

    2018-02-01

    Full Text Available The Colorado River is an important natural resource for the Southwestern United States. Predicted climate change impacts include increased temperature, decreased rainfall and increased probability of drought in this region. Given the large amount of hydropower on the Colorado River and its importance to the bulk electricity system, this purpose of this study was to quantify the value hydropower in operating the electrical system, and examined changes in hydropower value and electricity costs under different possible future drought conditions and regional generation scenarios. The goal was to better understand how these scenarios affect operating costs of the bulk electrical system, as well as the value of the hydropower produced, and proposed a method for doing so. The calculated value of the hydroelectric power was nearly double the mean locational marginal price in the study area, about $73 to $75 for most scenarios, demonstrating a high value of the hydropower. In general, it was found that reduced water availability increased operating costs, and increased the value of the hydropower. A calculated value factor showed that when less hydroelectric power is available, the hydropower is more valuable. Furthermore, the value factor showed that the value of hydro increases with the addition of solar or the retirement of thermal generating resources.

  14. Long-term stability analysis of the left bank abutment slope at Jinping I hydropower station

    Directory of Open Access Journals (Sweden)

    Long Zhang

    2016-06-01

    Full Text Available The time-dependent behavior of the left bank abutment slope at Jinping I hydropower station has a major influence on the normal operation and long-term safety of the hydropower station. To solve this problem, a geomechanical model containing various faults and weak structural planes is established, and numerical simulation is conducted under normal water load condition using FLAC3D, incorporating creep model proposed based on thermodynamics with internal state variables theory. The creep deformations of the left bank abutment slope are obtained, and the changes of principal stresses and deformations of the dam body are analyzed. The long-term stability of the left bank abutment slope is evaluated according to the integral curves of energy dissipation rate in domain and its derivative with respect to time, and the non-equilibrium evolution rules and the characteristic time can also be determined using these curves. Numerical results show that the left bank abutment slope tends to be stable in a global sense, and the stress concentration is released. It is also indicated that more attention should be paid to some weak regions within the slope in the long-term deformation process.

  15. Reevaluation of Turkey's hydropower potential and electric energy demand

    International Nuclear Information System (INIS)

    Yueksek, Omer

    2008-01-01

    This paper deals with Turkey's hydropower potential and its long-term electric energy demand predictions. In the paper, at first, Turkey's energy sources are briefly reviewed. Then, hydropower potential is analyzed and it has been concluded that Turkey's annual economically feasible hydropower potential is about 188 TWh, nearly 47% greater than the previous estimation figures of 128 TWh. A review on previous prediction models for Turkey's long-term electric energy demand is presented. In order to predict the future demand, new increment ratio scenarios, which depend on both observed data and future predictions of population, energy consumption per capita and total energy consumption, are developed. The results of 11 prediction models are compared and analyzed. It is concluded that Turkey's annual electric energy demand predictions in 2010, 2015 and 2020 vary between 222 and 242 (average 233) TWh; 302 and 356 (average 334) TWh; and 440 and 514 (average 476) TWh, respectively. A discussion on the role of hydropower in meeting long-term demand is also included in the paper and it has been predicted that hydropower can meet 25-35% of Turkey's electric energy demand in 2020

  16. An estimation of the Swiss hydropower rent

    International Nuclear Information System (INIS)

    Banfi, Silvia; Filippini, Massimo; Mueller, Adrian

    2005-01-01

    The electricity generation in Switzerland is mostly based on hydropower (∼58%) and nuclear power (∼38%). The exploitation of water in the hydropower sector can generate significant economic rent. One possibility to capture this rent is through royalties or fees. This system has been used in Switzerland since many decades. However, the actual water fee system is not flexible and does not take into consideration different production costs between the type and location of hydropower plants. Furthermore, storage plants can sell electricity to a higher price than run-of-river plants. A flexible system is needed in a liberalized electricity market, to take into account these different production situations and the fact that prices may vary considerably over time. The main goal of this paper is to calculate the potential economic rent that could be generated in the Swiss hydropower sector under a future liberalized market. Based on the results of the paper, it can be concluded that the introduction of a flexible fee system could improve the competitiveness of the hydropower sector and promote an energy system based on renewable energy sources

  17. From probabilistic forecasts to statistical scenarios of short-term wind power production

    DEFF Research Database (Denmark)

    Pinson, Pierre; Papaefthymiou, George; Klockl, Bernd

    2009-01-01

    on the development of the forecast uncertainty through forecast series. However, this additional information may be paramount for a large class of time-dependent and multistage decision-making problems, e.g. optimal operation of combined wind-storage systems or multiple-market trading with different gate closures......Short-term (up to 2-3 days ahead) probabilistic forecasts of wind power provide forecast users with highly valuable information on the uncertainty of expected wind generation. Whatever the type of these probabilistic forecasts, they are produced on a per horizon basis, and hence do not inform....... This issue is addressed here by describing a method that permits the generation of statistical scenarios of short-term wind generation that accounts for both the interdependence structure of prediction errors and the predictive distributions of wind power production. The method is based on the conversion...

  18. Exploring the impact of co-varying water availability and energy price on productivity and profitability of Alpine hydropower

    Science.gov (United States)

    Anghileri, Daniela; Botter, Martina; Castelletti, Andrea; Burlando, Paolo

    2016-04-01

    Alpine hydropower systems are experiencing dramatic changes both from the point of view of hydrological conditions, e.g., water availability and frequency of extremes events, and of energy market conditions, e.g., partial or total liberalization of the market and increasing share of renewable power sources. Scientific literature has, so far, mostly focused on the analysis of climate change impacts and associated uncertainty on hydropower operation, underlooking the consequences that socio-economic changes, e.g., energy demand and/or price changes, can have on hydropower productivity and profitability. In this work, we analyse how hydropower reservoir operation is affected by changes in both water availability and energy price. We consider stochastically downscaled climate change scenarios of precipitation and temperature to simulate reservoir inflows using a physically explicit hydrological model. We consider different scenarios of energy demand and generation mix to simulate energy prices using an electricity market model, which includes different generation sources, demand sinks, and features of the transmission lines. We then use Multi-Objective optimization techniques to design the operation of hydropower reservoirs for different purposes, e.g. maximization of revenue and/or energy production. The objective of the work is to assess how the tradeoffs between the multiple operating objectives evolve under different co-varying climate change and socio-economic scenarios and to assess the adaptive capacity of the system. The modeling framework is tested on the real-world case study of the Mattmark reservoir in Switzerland.

  19. A method for the assessment of long-term changes in carbon stock by construction of a hydropower reservoir.

    Science.gov (United States)

    Bernardo, Julio Werner Yoshioka; Mannich, Michael; Hilgert, Stephan; Fernandes, Cristovão Vicente Scapulatempo; Bleninger, Tobias

    2017-09-01

    Sustainability of hydropower reservoirs has been questioned since the detection of their greenhouse gas (GHG) emissions which are mainly composed of carbon dioxide and methane. A method to assess the impact on the carbon cycle caused by the transition from a natural river system into a reservoir is presented and discussed. The method evaluates the long term changes in carbon stock instead of the current approach of monitoring and integrating continuous short term fluxes. A case study was conducted in a subtropical reservoir in Brazil, showing that the carbon content within the reservoir exceeds that of the previous landuse. The average carbon sequestration over 43 years since damming was 895 mg C m[Formula: see text] and found to be mainly due to storage of carbon in sediments. These results demonstrate that reservoirs have two opposite effects on the balance of GHGs. By storing organic C in sediments, reservoirs are an important carbon sink. On the other hand, reservoirs increase the flux of methane into the atmosphere. If the sediments of reservoirs could be used for long term C storage, reservoirs might have a positive effect on the balance of GHGs.

  20. The impact of global change on the hydropower potential of Europe: a model-based analysis

    International Nuclear Information System (INIS)

    Lehner, Bernhard; Czisch, Gregor; Vassolo, Sara

    2005-01-01

    This study presents a model-based approach for analyzing the possible effects of global change on Europe's hydropower potential at a country scale. By comparing current conditions of climate and water use with future scenarios, an overview is provided of today's potential for hydroelectricity generation and its mid- and long-term prospects. The application of the global water model WaterGAP for discharge calculations allows for an integrated assessment, taking both climate and socioeconomic changes into account. This study comprises two key parts: First, the 'gross' hydropower potential is analyzed, in order to outline the general distribution and trends in hydropower capabilities across Europe. Then, the assessment focuses on the 'developed' hydropower potential of existing hydropower plants, in order to allow for a more realistic picture of present and future electricity production. For the second part, a new data set has been developed which geo-references 5991 European hydropower stations and distinguishes them into run-of-river and reservoir stations. The results of this study present strong indications that, following moderate climate and global change scenario assumptions, severe future alterations in discharge regimes have to be expected, leading to unstable regional trends in hydropower potentials with reductions of 25% and more for southern and southeastern European countries

  1. Short-Term and Working Memory Impairments in Early-Implanted, Long-Term Cochlear Implant Users Are Independent of Audibility and Speech Production.

    Science.gov (United States)

    AuBuchon, Angela M; Pisoni, David B; Kronenberger, William G

    2015-01-01

    To determine whether early-implanted, long-term cochlear implant (CI) users display delays in verbal short-term and working memory capacity when processes related to audibility and speech production are eliminated. Twenty-three long-term CI users and 23 normal-hearing controls each completed forward and backward digit span tasks under testing conditions that differed in presentation modality (auditory or visual) and response output (spoken recall or manual pointing). Normal-hearing controls reproduced more lists of digits than the CI users, even when the test items were presented visually and the responses were made manually via touchscreen response. Short-term and working memory delays observed in CI users are not due to greater demands from peripheral sensory processes such as audibility or from overt speech-motor planning and response output organization. Instead, CI users are less efficient at encoding and maintaining phonological representations in verbal short-term memory using phonological and linguistic strategies during memory tasks.

  2. Hydro-power

    International Nuclear Information System (INIS)

    Piro, P.

    2010-01-01

    On average the hydro-power sector produces 12% of the electrical power in France. A quarter of this production might pass to another operator than EDF because the end of some grants is nearing (2012 for 12 installations). In France the power of rivers belongs to the state that gives operators grants to harness it. The allowance lasts 75 years usually but for installations below 4.5 MW a permanent and definitive grant is allowed. Most installations are ancient and their investment have been paid off since a long, so hydro-power is the most profitable renewable energy in France. A lot of bidders are expected. Each bid will be assessed on 3 criteria: -) the global energy efficiency of the waterfall, -) a balanced management of the water resource, and -) an economic and financial offer to the state. The balance between the different uses of water is getting more delicate to reach and this renewal of grants will be an opportunity for the state to impose a better preservation of the environment. In July 2008, the French government announced a program for the re launching of the hydro-power, this program has been reduced and now only 3000 GWh supplementary are expected by 2020. (A.C.)

  3. On Uneven Ground: How Corporate Governance Prioritizes Short-term Speculative Investments, Impedes Productive Investments, and Jeopardizes Productivity Growth

    OpenAIRE

    Christian E. Weller; Luke Reidenbach

    2011-01-01

    The economic recovery after the Great Recession highlighted a continuous divergence between soaring profits and lagging investment. These trends are related at the corporate level, where corporate managers have stronger incentives to pursue short-term profit-seeking activities than to invest in longer-term productive activities, such as hiring and training people and investment in physical infrastructure. This prioritization results because the corporate governance system is biased towards th...

  4. Improved evaluation of the blue water footprint from hydropower in the United States

    Science.gov (United States)

    Zhao, G.; Gao, H.

    2017-12-01

    As the world's largest source of renewable energy, hydropower contributes 16.6% of the electricity production in the world. Even though it produces no waste, hydropower exhausts a considerable amount of water mostly through evaporation from the extended surface areas of the manmade lakes. The water footprint of hydropower becomes even larger with rising temperatures. To assist with the precise management of both water resources and energy production in the Contiguous United States (CONUS), 82 major dams—all with a primary purpose of producing hydroelectric power—were evaluated in terms of their blue water footprints. These dams account for 21% of the entire hydropower generation in the CONUS. Reservoir evaporation is calculated using state-of-the-art reservoir surface area and evaporation rate information. Instead of using fixed surface areas for the reservoirs—a practice which is adopted by virtually all other studies (and generally leads to over-or-under estimations)—time-variant surface areas were generated from Landsat imageries archived on Google Earth Engine (GEE) platform. Additionally, evaporation rates were calculated using an equilibrium method that incorporates the heat storage effects of the reservoirs. Results show that water consumption from hydropower is large and non-negligible. Furthermore, the differences of the blue water footprints among the dams studied are also significant. The results of this study can benefit the evaluation of existing dams (e.g. recommendation for dam removal) and the planning of future hydroelectric dams.

  5. The role of hydropower in meeting Turkey's electric energy demand

    International Nuclear Information System (INIS)

    Yuksek, Omer; Komurcu, Murat Ihsan; Yuksel, Ibrahim; Kaygusuz, Kamil

    2006-01-01

    The inherent technical, economic and environmental benefits of hydroelectric power, make it an important contributor to the future world energy mix, particularly in the developing countries. These countries, such as Turkey, have a great and ever-intensifying need for power and water supplies and they also have the greatest remaining hydro potential. From the viewpoint of energy sources such as petroleum and natural gas, Turkey is not a rich country; but it has an abundant hydropower potential to be used for generation of electricity and must increase hydropower production in the near future. This paper deals with policies to meet the increasing electricity demand for Turkey. Hydropower and especially small hydropower are emphasized as Turkey's renewable energy sources. The results of two case studies, whose results were not taken into consideration in calculating Turkey's hydro electric potential, are presented. Turkey's small hydro power potential is found to be an important energy source, especially in the Eastern Black Sea Region. The results of a study in which Turkey's long-term demand has been predicted are also presented. According to the results of this paper, Turkey's hydro electric potential can meet 33-46% of its electric energy demand in 2020 and this potential may easily and economically be developed

  6. A least squares approach for efficient and reliable short-term versus long-term optimization

    DEFF Research Database (Denmark)

    Christiansen, Lasse Hjuler; Capolei, Andrea; Jørgensen, John Bagterp

    2017-01-01

    The uncertainties related to long-term forecasts of oil prices impose significant financial risk on ventures of oil production. To minimize risk, oil companies are inclined to maximize profit over short-term horizons ranging from months to a few years. In contrast, conventional production...... optimization maximizes long-term profits over horizons that span more than a decade. To address this challenge, the oil literature has introduced short-term versus long-term optimization. Ideally, this problem is solved by a posteriori multi-objective optimization methods that generate an approximation...... the balance between the objectives, leaving an unfulfilled potential to increase profits. To promote efficient and reliable short-term versus long-term optimization, this paper introduces a natural way to characterize desirable Pareto points and proposes a novel least squares (LS) method. Unlike hierarchical...

  7. Gis-based procedures for hydropower potential spotting

    Energy Technology Data Exchange (ETDEWEB)

    Larentis, Dante G.; Collischonn, Walter; Tucci, Carlos E.M. [Instituto de Pesquisas Hidraulicas da UFRGS, Av. Bento Goncalves, 9500, CEP 91501-970, Caixa Postal 15029, Porto Alegre, RS (Brazil); Olivera, Francisco (Texas A and M University, Zachry Department of Civil Engineering 3136 TAMU, College Station, TX 77843-3136, US)

    2010-10-15

    The increasing demand for energy, especially from renewable and sustainable sources, spurs the development of small hydropower plants and encourages investment in new survey studies. Preliminary hydropower survey studies usually carry huge uncertainties about the technical, economic and environmental feasibility of the undeveloped potential. This paper presents a methodology for large-scale survey of hydropower potential sites to be applied in the inception phase of hydroelectric development planning. The sequence of procedures to identify hydropower sites is based on remote sensing and regional streamflow data and was automated within a GIS-based computational program: Hydrospot. The program allows spotting more potential sites along the drainage network than it would be possible in a traditional survey study, providing different types of dam-powerhouse layouts and two types (operating modes) of projects: run-of-the-river and storage projects. Preliminary results from its applications in a hydropower-developed basin in Brazil have shown Hydrospot's limitations and potentialities in giving support to the mid-to-long-term planning of the electricity sector. (author)

  8. Integrating Economic and Ecological Benchmarking for a Sustainable Development of Hydropower

    Directory of Open Access Journals (Sweden)

    Philipp Emanuel Hirsch

    2016-08-01

    Full Text Available Hydropower reservoirs play an increasingly important role for the global electricity supply. Reservoirs are anthropogenically-dominated ecosystems because hydropower operations induce artificial water level fluctuations (WLF that exceed natural fluctuations in frequency and amplitude. These WLF have detrimental ecological effects, which can be quantified as losses to ecosystem primary production due to lake bottoms that fall dry. To allow for a sustainable development of hydropower, these “ecological costs” of WLF need to be weighed against the “economic benefits” of hydropower that can balance and store intermittent renewable energy. We designed an economic hydropower operation model to derive WLF in large and small reservoirs for three different future energy market scenarios and quantified the according losses in ecosystem primary production in semi-natural outdoor experiments. Our results show that variations in market conditions affect WLF differently in small and large hydropower reservoirs and that increasing price volatility magnified WLF and reduced primary production. Our model allows an assessment of the trade-off between the objectives of preserving environmental resources and economic development, which lies at the core of emerging sustainability issues.

  9. Developing a module for estimating climate warming effects on hydropower pricing in California

    International Nuclear Information System (INIS)

    Guégan, Marion; Uvo, Cintia B.; Madani, Kaveh

    2012-01-01

    Climate warming is expected to alter hydropower generation in California through affecting the annual stream-flow regimes and reducing snowpack. On the other hand, increased temperatures are expected to increase hydropower demand for cooling in warm periods while decreasing demand for heating in winter, subsequently altering the annual hydropower pricing patterns. The resulting variations in hydropower supply and pricing regimes necessitate changes in reservoir operations to minimize the revenue losses from climate warming. Previous studies in California have only explored the effects of hydrological changes on hydropower generation and revenues. This study builds a long-term hydropower pricing estimation tool, based on artificial neural network (ANN), to develop pricing scenarios under different climate warming scenarios. Results suggest higher average hydropower prices under climate warming scenarios than under historical climate. The developed tool is integrated with California's Energy-Based Hydropower Optimization Model (EBHOM) to facilitate simultaneous consideration of climate warming on hydropower supply, demand and pricing. EBHOM estimates an additional 5% drop in annual revenues under a dry warming scenario when climate change impacts on pricing are considered, with respect to when such effects are ignored, underlining the importance of considering changes in hydropower demand and pricing in future studies and policy making. - Highlights: ► Addressing the major gap in previous climate change and hydropower studies in California. ► Developing an ANN-based long-term hydropower price estimation tool. ► Estimating climate change effects on hydropower demand and pricing in California. ► Investigating the sensitivity of hydropower operations to future price changes. ► Underlining the importance of consideration of climate change impacts on electricity pricing.

  10. Hydropower Baseline Cost Modeling

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, Patrick W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Zhang, Qin Fen [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); DeNeale, Scott T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Chalise, Dol Raj [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Centurion, Emma E. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-01-01

    Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gaps in publically available hydropower cost-estimating tools that can support the national-scale evaluation of hydropower resources.

  11. Quadrennial Technology Review 2015: Technology Assessments--Hydropower

    Energy Technology Data Exchange (ETDEWEB)

    Sam Baldwin, Gilbert Bindewald, Austin Brown, Charles Chen, Kerry Cheung, Corrie Clark, Joe Cresko,

    2015-10-07

    Hydropower has provided reliable and flexible base and peaking power generation in the United States for more than a century, contributing on average 10.5% of cumulative U.S. power sector net generation over the past six and one-half decades (1949–2013). It is the nation’s largest source of renewable electricity, with 79 GW of generating assets and 22 GW of pumped-storage assets in service, with hydropower providing half of all U.S. renewable power-sector generation (50% in 2014). In addition to this capacity, the U.S. Department of Energy (DOE) has identified greater than 80 GW of new hydropower resource potential: at least 5 GW from rehabilitation and expansion of existing generating assets, up to 12 GW of potential at existing dams without power facilities, and over 60 GW of potential low-impact new development (LIND) in undeveloped stream reaches. However, despite this growth potential, hydropower capacity and production growth have stalled in recent years, with existing assets even experiencing decreases in capacity and production from lack of sustaining investments in infrastructure and increasing constraints on water use.

  12. Revisiting short-term price and volatility dynamics in day-ahead electricity markets with rising wind power

    International Nuclear Information System (INIS)

    Li, Yuanjing

    2015-01-01

    This paper revisits the short-term price and volatility dynamics in day-ahead electricity markets in consideration of an increasing share of wind power, using an example of the Nord Pool day-ahead market and the Danish wind generation. To do so, a GARCH process is applied, and market coupling and the counterbalance effect of hydropower in the Scandinavian countries are additionally accounted for. As results, we found that wind generation weakly dampens spot prices with an elasticity of 0.008 and also reduces price volatility with an elasticity of 0.02 in the Nordic day-ahead market. The results shed lights on the importance of market coupling and interactions between wind power and hydropower in the Nordic system through cross-border exchanges, which play an essential role in price stabilization. Additionally, an EGARCH specification confirms an asymmetric influence of the price innovations, whereby negative shocks produce larger volatility in the Nordic spot market. While considering heavy tails in error distributions can improve model fits significantly, the EGARCH model outperforms the GARCH model on forecast evaluations. (author)

  13. Assessment of small hydropower potential by software. Case study

    Directory of Open Access Journals (Sweden)

    Moldoveanu Alexandru

    2017-01-01

    Full Text Available The rivers hydropower potential is considered one of the oldest renewable energy source used in the electricity production process. A method to investigate the possibility to construct a micro hydropower system on a small river is presented. The analysis and the hydropower assessment were done by using Vapidro-Aste software. Results point out that micro-hydro units can be implemented in remote locations or hybrid renewable energy systems, while the environmental flow is guaranteed.

  14. Impacts of climate change on water resources and hydropower systems in central and southern Africa

    Energy Technology Data Exchange (ETDEWEB)

    Hamududu, Byman H.

    2012-11-15

    Climate change is altering hydrological processes with varying degrees in various regions of the world. This research work investigates the possible impacts of climate change on water resource and Hydropower production potential in central and southern Africa. The Congo, Zambezi and Kwanza, Shire, Kafue and Kabompo basins that lie in central and southern Africa are used as case studies. The review of climate change impact studies shows that there are few studies on impacts of climate change on hydropower production. Most of these studies were carried out in Europe and north America and very few in Asia, south America and Africa. The few studies indicate that southern Africa would experience reduction in precipitation and runoff, consequently reductions in hydropower production. There are no standard methods of assessing the resulting impacts. Two approaches were used to assess the impacts of climate change on water resources and hydropower. One approach is lumping changes on country or regional level and use the mean climate changes on mean annual flows as the basis for regional changes in hydropower production. This is done to get an overall picture of the changes on global and regional level. The second approach is a detailed assessment process in which downscaling, hydrological modelling and hydropower simulations are carried out. The possible future climate scenarios for the region of central and southern Africa depicted that some areas where precipitation are likely to have increases while other, precipitation will reduce. The region northern Zambia and southern Congo showed increases while the northern Congo basin showed reductions. Further south in southern African region, there is a tendency of decreases in precipitation. To the west, in Angola, inland showed increases while towards the coast highlighted some decreases in precipitation. On a global scale, hydropower is likely to experience slight changes (0.08%) due to climate change by 2050. Africa is

  15. Surface coal mine land reclamation using a dry flue gas desulfurization product: Short-term and long-term water responses.

    Science.gov (United States)

    Chen, Liming; Stehouwer, Richard; Tong, Xiaogang; Kost, Dave; Bigham, Jerry M; Dick, Warren A

    2015-09-01

    Abandoned coal-mined lands are a worldwide concern due to their potential negative environmental impacts, including erosion and development of acid mine drainage. A field study investigated the use of a dry flue gas desulfurization product for reclamation of abandoned coal mined land in USA. Treatments included flue gas desulfurization product at a rate of 280 Mg ha(-1) (FGD), FGD at the same rate plus 112 Mg ha(-1) yard waste compost (FGD/C), and conventional reclamation that included 20 cm of re-soil material plus 157 Mg ha(-1) of agricultural limestone (SOIL). A grass-legume sward was planted after treatment applications. Chemical properties of surface runoff and tile water (collected from a depth of 1.2m below the ground surface) were measured over both short-term (1-4 yr) and long-term (14-20 yr) periods following reclamation. The pH of surface runoff water was increased from approximately 3, and then sustained at 7 or higher by all treatments for up to 20 yr, and the pH of tile flow water was also increased and sustained above 5 for 20 yr. Compared with SOIL, concentrations of Ca, S and B in surface runoff and tile flow water were generally increased by the treatments with FGD product in both short- and long-term measurements and concentrations of the trace elements were generally not statistically increased in surface runoff and tile flow water over the 20-yr period. However, concentrations of As, Ba, Cr and Hg were occasionally elevated. These results suggest the use of FGD product for remediating acidic surface coal mined sites can provide effective, long-term reclamation. Copyright © 2015. Published by Elsevier Ltd.

  16. Climate change impacts on hydropower in the Swiss and Italian Alps.

    Science.gov (United States)

    Gaudard, Ludovic; Romerio, Franco; Dalla Valle, Francesco; Gorret, Roberta; Maran, Stefano; Ravazzani, Giovanni; Stoffel, Markus; Volonterio, Michela

    2014-09-15

    This paper provides a synthesis and comparison of methodologies and results obtained in several studies devoted to the impact of climate change on hydropower. By putting into perspective various case studies, we provide a broader context and improved understanding of climate changes on energy production. We also underline the strengths and weaknesses of the approaches used as far as technical, physical and economical aspects are concerned. Although the catchments under investigation are located close to each other in geographic terms (Swiss and Italian Alps), they represent a wide variety of situations which may be affected by differing evolutions for instance in terms of annual runoff. In this study, we also differentiate between run-of-river, storage and pumping-storage power plants. By integrating and comparing various analyses carried out in the framework of the EU-FP7 ACQWA project, this paper discusses the complexity as well as current and future issues of hydropower management in the entire Alpine region. © 2013 Elsevier B.V. All rights reserved.

  17. Hydropower in Estonia

    International Nuclear Information System (INIS)

    Raesaar, Peeter

    1997-01-01

    Long life practice has proved that small hydropower is not a beaten track in the global energy field. Before the Second World War small hydropower was rather well developed in Estonia as well. Being neglected during the years of Soviet occupation, it is rather important to help it to regain its position in the Estonian energy system once again. Our hydropower potential is not big, but it has got a good established position as an energy saving measure. By now we have some good examples of restored hydropower stations on commercial basis to be optimistic about the future

  18. Developing hydropower overseas

    International Nuclear Information System (INIS)

    Smith, W.B.

    1991-01-01

    This article examines how the National Hydropower Association (NHA) has found ways to support its members who desire to expand their business programs to foreign markets through participation in a wide range of government programs. The topics of the article include the market in developing countries, the certificate of review, products and services, and domestic and international competition

  19. Assessing residual hydropower potential of the La Plata Basin accounting for future user demands

    Science.gov (United States)

    Popescu, I.; Brandimarte, L.; Perera, M. S. U.; Peviani, M.

    2012-08-01

    La Plata Basin is shared by five countries (Argentina, Bolivia, Brazil, Paraguay and Uruguay), which have fast growing economies in South America. These countries need energy for their sustainable development; hence, hydropower can play a very important role as a renewable clean source of energy. This paper presents an analysis of the current hydropower production and electricity demand in La Plata Basin (LPB), and it analyses the maximum and residual hydropower potential of the basin for a horizon of 30 yr (i.e. year 2040). Current hydropower production is estimated based on historical available data, while future energy production is deduced from the available water in the catchment (estimated based on measured hydrographs of the past years), whereas electricity demand is assessed by correlating existing electricity demand with the estimated population growth and economic development. The maximum and residual hydropower potential of the basin were assessed for the mean annual flows of the present hydrological regime (1970-2000) and topographical characteristics of the area. Computations were performed using an integrated GIS environment called VAPIDRO-ASTE released by the Research on Energy System (Italy). The residual hydropower potential of the basin is computed considering first that the water supply needs for population, industry and agriculture are served, and then hydropower energy is produced. The calculated hydropower production is found to be approximately half of the estimated electricity demand, which shows that there is a need to look for other sources of energy in the future.

  20. Establishment and evaluation of operation function model for cascade hydropower station

    OpenAIRE

    Chang-ming Ji; Ting Zhou; Hai-tao Huang

    2010-01-01

    Toward solving the actual operation problems of cascade hydropower stations under hydrologic uncertainty, this paper presents the process of extraction of statistical characteristics from long-term optimal cascade operation, and proposes a monthly operation function algorithm for the actual operation of cascade hydropower stations through the identification, processing, and screening of available information during long-term optimal operation. Applying the operation function to the cascade hy...

  1. Effects of the uncertainty of energy price and water availability forecasts on the operation of Alpine hydropower reservoir systems

    Science.gov (United States)

    Anghileri, D.; Castelletti, A.; Burlando, P.

    2016-12-01

    European energy markets have experienced dramatic changes in the last years because of the massive introduction of Variable Renewable Sources (VRSs), such as wind and solar power sources, in the generation portfolios in many countries. VRSs i) are intermittent, i.e., their production is highly variable and only partially predictable, ii) are characterized by no correlation between production and demand, iii) have negligible costs of production, and iv) have been largely subsidized. These features result in lower energy prices, but, at the same time, in increased price volatility, and in network stability issues, which pose a threat to traditional power sources because of smaller incomes and higher maintenance costs associated to a more flexible operation of power systems. Storage hydropower systems play an important role in compensating production peaks, both in term of excess and shortage of energy. Traditionally, most of the research effort in hydropower reservoir operation has focused on modeling and forecasting reservoir inflow as well as designing reservoir operation accordingly. Nowadays, price variability may be the largest source of uncertainty in the context of hydropower systems, especially when considering medium-to-large reservoirs, whose storage can easily buffer small inflow fluctuations. In this work, we compare the effects of uncertain inflow and energy price forecasts on hydropower production and profitability. By adding noise to historic inflow and price trajectories, we build a set of synthetic forecasts corresponding to different levels of predictability and assess their impact on reservoir operating policies and performances. The study is conducted on different hydropower systems, including storage systems and pumped-storage systems, with different characteristics, e.g., different inflow-capacity ratios. The analysis focuses on Alpine hydropower systems where the hydrological regime ranges from purely ice and snow-melt dominated to mixed snow

  2. Resource rent taxation and benchmarking-A new perspective for the Swiss hydropower sector

    International Nuclear Information System (INIS)

    Banfi, Silvia; Filippini, Massimo

    2010-01-01

    The electricity generation in Switzerland is mainly based on hydropower (55% of total production). The exploitation of water in the hydropower sector can generate significant so-called resource rents. These are defined by the surplus return above the value of capital, labor, materials, and energy used to exploit hydropower. In Switzerland, hydropower producers pay to the State a fixed fee per kW gross capacity. With this system the substantial differences in costs, revenues and in the production characteristics of the hydropower plants are not taken into account. In this context, the following paper has two main goals: (1) to discuss the introduction in the Swiss hydropower sector of a new payment system based on a resource rent tax; (2) To propose a combination of a RRT system with a benchmarking analysis of the production cost obtained through the estimation of a stochastic frontier variable cost function. We estimate a true random effects stochastic frontier variable cost function using panel data in order to overcome the asymmetric information problem. In addition, using the information on cost efficiency of the single companies, we show how to introduce in the RRT scheme a benchmark system which gives incentives to minimize the production costs.

  3. Hydropower and biomass as renewable energy sources in Turkey

    International Nuclear Information System (INIS)

    Kaygusuz, K.

    2001-01-01

    When talking about renewable energy sources today, the most important and economical energy sources for Turkey are hydropower and biomass.The present study gives a review of production, consumption, and economics of hydropower and biomass as renewable energy sources in Turkey. Turkey has a total gross hydropower potential of 433 GW, but only 125 GW of the total hydroelectric potential of Turkey can be economically used. By the commissioning of new hydropower plants, which are under construction, 36% of the economically usable potential of the country could be tapped. On the other hand, biomass (wood and wastes) energy is the second most important renewable energy source for Turkey. However, the biomass energy sources of Turkey are limited. In 1998, the biomass share of the total energy consumption of the country is 10%. In this study, the potential of important biomass energy sources and animal solid wastes of the country were determined. The effects of hydropower and biomass usage on the environment were also discussed. Considering total cereal products and fatty seed plants, approximately 50-60 million tons per year of biomass and 8-10 million tons of solid matter animal waste are produced, and 70% of total biomass is seen as being usable for energy. Some useful suggestions and recommendations are also presented. The present study shows that there is an important potential for hydropower and biomass energy sources in Turkey. (author)

  4. Efficient operation of a multi-purpose reservoir in Chile: Tradeoffs between irrigation and hydropower production

    Science.gov (United States)

    Gonzalez Cabrera, J. M., Sr.; Olivares, M. A.

    2015-12-01

    This study proposes a method to develop efficient operational policies for a reservoir the southern Chile. The main water uses in this system are hydropower and irrigation, with conflicting seasonal demands. The conflict between these two uses is currently managed through a so-called "irrigation agreement" which defines a series of operational conditions on the reservoir by restricting volumes used for power production depending on reservoir storage level. Other than that, the reservoir operation is driven by cost-minimization over the power grid. Recent evidence shows an increasing degree of conflict in this basin, which suggests that the static approach of irrigation agreements, might no longer be appropriate. Moreover, this agreement could be revised in light of decreased water availability. This problem poses a challenge related to the spatial scope of analysis. Thus, irrigation benefits are driven by decisions made within the basin, whereas hydropower benefits depend on the operation of the entire power grid. Exploring the tradeoffs between these two water uses involves modeling both scales. The proposed methodology integrates information from both a grid-wide power operations model and a basin-wide agro-economic model into a decision model for optimal reservoir operation. The first model, a hydrothermal coordination tool, schedules power production by each plant in the grid, and allows capturing technical and economic aspects to the operation of hydropower reservoirs. The agro-economic model incorporates economic features of irrigation in the basin, and allows obtaining irrigation water demand functions. Finally, the results of both models are integrated into a single model for optimal reservoir operation considering the tradeoffs between the two uses. The result of the joint operation of water resources, show a flexible coordination of uses, revealing the opportunity cost of irrigation, which it gives the possibility of negotiating transfers of water to

  5. Short-term LNG-markets

    International Nuclear Information System (INIS)

    Eldegard, Tom; Lund, Arne-Christian; Miltersen, Kristian; Rud, Linda

    2005-01-01

    The global Liquefied Natural Gas (LNG) industry has experienced substantial growth in the past decades. In the traditional trade patterns of LNG the product has typically been handled within a dedicated chain of plants and vessels fully committed by long term contracts or common ownership, providing risk sharing of large investments in a non-liquid market. Increasing gas prices and substantial cost reductions in all parts of the LNG chain have made LNG projects viable even if only part of the capacity is secured by long-term contracts, opening for more flexible trade of the remainder. Increasing gas demand, especially in power generation, combined with cost reductions in the cost of LNG terminals, open new markets for LNG. For the LNG supplier, the flexibility of shifting volumes between regions represents an additional value. International trade in LNG has been increasing, now accounting for more than one fifth of the world's cross-border gas trade. Despite traditional vertical chain bonds, increased flexibility has contributed in fact to an increasing LNG spot trade, representing 8% of global trade in 2002. The focus of this paper is on the development of global short-term LNG markets, and their role with respect to efficiency and security of supply in European gas markets. Arbitrage opportunities arising from price differences between regional markets (such as North America versus Europe) are important impetuses for flexible short-term trade. However, the short-term LNG trade may suffer from problems related to market access, e.g. limited access to terminals and regulatory issues, as well as rigidities connected to vertical binding within the LNG chain. Important issues related to the role of short-term LNG-trade in the European gas market are: Competition, flexibility in meeting peak demand, security of supply and consequences of differences in pricing policies (oil-linked prices in Europe and spot market prices in North America). (Author)

  6. Modeling Net Land Occupation of Hydropower Reservoirs in Norway for Use in Life Cycle Assessment.

    Science.gov (United States)

    Dorber, Martin; May, Roel; Verones, Francesca

    2018-02-20

    Increasing hydropower electricity production constitutes a unique opportunity to mitigate climate change impacts. However, hydropower electricity production also impacts aquatic and terrestrial biodiversity through freshwater habitat alteration, water quality degradation, and land use and land use change (LULUC). Today, no operational model exists that covers any of these cause-effect pathways within life cycle assessment (LCA). This paper contributes to the assessment of LULUC impacts of hydropower electricity production in Norway in LCA. We quantified the inundated land area associated with 107 hydropower reservoirs with remote sensing data and related it to yearly electricity production. Therewith, we calculated an average net land occupation of 0.027 m 2 ·yr/kWh of Norwegian storage hydropower plants for the life cycle inventory. Further, we calculated an adjusted average land occupation of 0.007 m 2 ·yr/kWh, accounting for an underestimation of water area in the performed maximum likelihood classification. The calculated land occupation values are the basis to support the development of methods for assessing the land occupation impacts of hydropower on biodiversity in LCA at a damage level.

  7. Assessing Impacts of Hydropower Regulation on Salmonid Habitat Connectivity to Guide River Restoration

    Science.gov (United States)

    Buddendorf, Bas; Geris, Josie; Malcolm, Iain; Wilkinson, Mark; Soulsby, Chris

    2016-04-01

    Anthropogenic activity in riverine ecosystems has led to a substantial divergence from the natural state of many rivers globally. Many of Scotland's rivers have been regulated for hydropower with increasing intensity since the 1890s. At the same time they sustain substantial populations of Atlantic Salmon (Salmo salar L.), which have a range of requirements in terms of flow and access to habitat, depending on the different life-stages. River barriers for hydropower regulation can change the spatial and temporal connectivity within river networks, the impacts of which on salmon habitat are not fully understood. Insight into such changes in connectivity, and the link with the distribution and accessibility of suitable habitat and areas of high productivity, are essential to aid restoration and/or conservation efforts. This is because they indicate where such efforts might have a higher chance of being successful in terms of providing suitable habitat and increasing river productivity. In this study we applied a graph theory approach to assess historic (natural) and contemporary (regulated) in-stream habitat connectivity of the River Lyon, an important UK salmon river that is moderately regulated for hydropower. Historic maps and GIS techniques were used to construct the two contrasting river networks (i.e., natural vs. regulated). Subsequently, connectivity metrics were used to assess the impacts of hydropower infrastructure on upstream and downstream migration possibilities for adults and juveniles, respectively. A national juvenile salmon production model was used to weight the importance of reaches for juvenile salmon production. Results indicate that the impact of barriers in the Lyon on the connectivity indices depends on the type of barrier and its location within the network, but is generally low for both adults and juveniles, and that compared to the historic river network the reduction in the amount of suitable habitat and juvenile production is most marked

  8. Development potential for hydropower; Ausbaupotential der Wasserkraft

    Energy Technology Data Exchange (ETDEWEB)

    Laufer, F.; Groetzinger, S.; Peter, M.; Schmutz, A.

    2004-11-15

    This comprehensive report for the Swiss Federal Office of Energy (SFOE) takes a look at the potential for the development of hydropower in Switzerland. The report updates the energy perspectives made ten years earlier. An overview of Swiss electricity production and consumption is presented and the proportion provided by hydropower is noted. Figures on installed capacity and import/export quantities are presented and discussed. Technological developments and the economical frameworks involved are discussed, as are regulatory measures that can be taken. Theoretical and technically realisable potentials for increased use of hydropower are discussed. The methods used to do this are examined. Strategies and measures to be taken are listed and discussed. An appendix includes data sheets on power plant modelling, including examples

  9. Projecting hydropower production under future climates: a review of modelling challenges and open questions

    Science.gov (United States)

    Schaefli, Bettina

    2015-04-01

    Hydropower is a pillar for renewable electricity production in almost all world regions. The planning horizon of major hydropower infrastructure projects stretches over several decades and consideration of evolving climatic conditions plays an ever increasing role. This review of model-based climate change impact assessments provides a synthesis of the wealth of underlying modelling assumptions, highlights the importance of local factors and attempts to identify the most urgent open questions. Based on existing case studies, it critically discusses whether current hydro-climatic modelling frameworks are likely to provide narrow enough water scenario ranges to be included into economic analyses for end-to-end climate change impact assessments including electricity market models. This will be completed with an overview of not or indirectly climate-related boundary conditions, such as economic growth, legal constraints, national subsidy frameworks or growing competition for water, which might locally largely outweigh any climate change impacts.

  10. Research on Cascade Reservoirs’ Short-Term Optimal Operation under the Effect of Reverse Regulation

    Directory of Open Access Journals (Sweden)

    Changming Ji

    2018-06-01

    Full Text Available Currently research on joint operation of a large reservoir and its re-regulating reservoir focuses on either water quantity regulation or water head regulation. The accuracy of relevant models is in need of improvement if the influence of factors such as water flow hysteresis and the aftereffect of tail water level variation are taken into consideration. In this paper, given the actual production of Pankou-Xiaoxuan cascade hydropower stations that combines two operation modes (‘electricity to water’ and ‘water to electricity’, a coupling model of their short-term optimal operation is developed, which considers Xiaoxuan reservoir’s regulating effect on Pankou reservoir’s outflow volume and water head. Factors such as water flow hysteresis and the aftereffect of tail water level variation are also considered to enhance the model’s accuracy. The Backward Propagation (BP neural network is employed for precise calculation of the downstream reservoir’s inflow and the upstream reservoir’s tail water level. Besides, we put forth Accompanying Progressive Optimality Algorithm (APOA to solve the coupling model with aftereffect. An example is given to verify the scientificity of the proposed model and the advantages of APOA. Through analysis of the model calculation results, the optimal operation rules of the cascade reservoirs are obtained in terms of water quantity regulation and water head regulation, which can provide scientific reference for cascade reservoirs’ optimal operation.

  11. Audit of long-term and short-term liabilities

    Directory of Open Access Journals (Sweden)

    Korinko M.D.

    2017-03-01

    Full Text Available The article determines the importance of long-term and short-term liabilities for the management of financial and material resources of an enterprise. It reviews the aim, objects and information generators for realization of audit of short-term and long-term obligations. The organizing and methodical providing of audit of long-term and short-term liabilities of an enterprise are generalized. The authors distinguish the stages of realization of audit of long-term and short-term liabilities, the aim of audit on each of the presented stages, and recommend methodical techniques. It is fixed that it is necessary to conduct the estimation of the systems of internal control and record-keeping of an enterprise by implementation of public accountant procedures for determination of volume and maintenance of selection realization. After estimating the indicated systems, a public accountant determines the methodology for realization of public accountant verification of long-term and short-term liabilities. The analytical procedures that public accountants are expedient to use for realization of audit of short-term and long-term obligations are determined. The authors suggest the classification of the educed defects on the results of the conducted public accountant verification of short-term and long-term obligations.

  12. Assessing residual hydropower potential of the La Plata Basin accounting for future user demands

    Directory of Open Access Journals (Sweden)

    I. Popescu

    2012-08-01

    Full Text Available La Plata Basin is shared by five countries (Argentina, Bolivia, Brazil, Paraguay and Uruguay, which have fast growing economies in South America. These countries need energy for their sustainable development; hence, hydropower can play a very important role as a renewable clean source of energy. This paper presents an analysis of the current hydropower production and electricity demand in La Plata Basin (LPB, and it analyses the maximum and residual hydropower potential of the basin for a horizon of 30 yr (i.e. year 2040. Current hydropower production is estimated based on historical available data, while future energy production is deduced from the available water in the catchment (estimated based on measured hydrographs of the past years, whereas electricity demand is assessed by correlating existing electricity demand with the estimated population growth and economic development. The maximum and residual hydropower potential of the basin were assessed for the mean annual flows of the present hydrological regime (1970–2000 and topographical characteristics of the area.

    Computations were performed using an integrated GIS environment called VAPIDRO-ASTE released by the Research on Energy System (Italy. The residual hydropower potential of the basin is computed considering first that the water supply needs for population, industry and agriculture are served, and then hydropower energy is produced. The calculated hydropower production is found to be approximately half of the estimated electricity demand, which shows that there is a need to look for other sources of energy in the future.

  13. Short-Term Memory and Aphasia: From Theory to Treatment.

    Science.gov (United States)

    Minkina, Irene; Rosenberg, Samantha; Kalinyak-Fliszar, Michelene; Martin, Nadine

    2017-02-01

    This article reviews existing research on the interactions between verbal short-term memory and language processing impairments in aphasia. Theoretical models of short-term memory are reviewed, starting with a model assuming a separation between short-term memory and language, and progressing to models that view verbal short-term memory as a cognitive requirement of language processing. The review highlights a verbal short-term memory model derived from an interactive activation model of word retrieval. This model holds that verbal short-term memory encompasses the temporary activation of linguistic knowledge (e.g., semantic, lexical, and phonological features) during language production and comprehension tasks. Empirical evidence supporting this model, which views short-term memory in the context of the processes it subserves, is outlined. Studies that use a classic measure of verbal short-term memory (i.e., number of words/digits correctly recalled in immediate serial recall) as well as those that use more intricate measures (e.g., serial position effects in immediate serial recall) are discussed. Treatment research that uses verbal short-term memory tasks in an attempt to improve language processing is then summarized, with a particular focus on word retrieval. A discussion of the limitations of current research and possible future directions concludes the review. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  14. Optimization of Mangala Hydropower Station, Pakistan, using Optimization Techniques

    Directory of Open Access Journals (Sweden)

    Zaman Muhammad

    2017-01-01

    Full Text Available Hydropower generation is one of the key element in the economy of a country. The present study focusses on the optimal electricity generation from the Mangla reservoir in Pakistan. A mathematical model has been developed for the Mangla hydropower station and particle swarm and genetic algorithm optimization techniques were applied at this model for optimal electricity generation. Results revealed that electricity production increases with the application of optimization techniques at the proposed mathematical model. Genetic Algorithm can produce maximum electricity than Particle swarm optimization but the time of execution of particle swarm optimization is much lesser than the Genetic algorithm. Mangla hydropower station can produce up to 59*109 kWh electricity by using the flows optimally than 47*108 kWh production from traditional methods.

  15. Small Hydropower - The comeback of small hydropower stations

    International Nuclear Information System (INIS)

    Niederhaeusern, A.

    2008-01-01

    This issue of the 'Erneuerbare Energien' (renewable energies) magazine published by the Swiss Solar Energy Society takes a look at small hydropower projects in Switzerland. In a number of interviews and articles, various topics concerning small hydropower are dealt with. First of all, an interview with Bruno Guggisberg, previously responsible for small hydro at the Swiss Federal Office of Energy, examines the potential of small hydro and the various political, technical and economic influences on such projects. Further articles provide an overview of the various types of small hydro schemes, including power generation using height differences in drinking-water and wastewater installations. As far as the components of small hydro schemes are concerned, various types of turbines and further system components that are needed are examined. A further article takes a look at the small hydro market and the market players involved. Ecological aspects and research activities are discussed in further articles. In a second interview with Martin Boelli, presently responsible for small hydropower at the Swiss Federal Office of Energy, the unused potential for the use of hydropower in Switzerland is discussed. Examples of small-scale hydro schemes are examined and the support offered by the Small Hydropower Program is discussed. Finally the question is asked, if the small hydro market in Switzerland is overheated as a result of promotion schemes such as cost-covering remuneration for electricity from renewable energy sources.

  16. The duty to negotiate in good faith and the enforceability of short-term natural gas clauses in production sharing agreements

    International Nuclear Information System (INIS)

    Bishop, R.D.

    1997-01-01

    The exploitation of natural gas resources not associated with oil production, poses legal and ethical problems for some countries. This document examines various international oil contracts, especially Production Sharing Agreements (PSA), to establish how short-term gas provisions can be exploited. In particular the issue of breaching a PSA by failing to negotiate in good faith on such a project is debated, showing how clearly this duty falls on the government party. International oil companies are urged to create contracts which allow them to enforce short-term PSA gas clauses. (UK)

  17. Land Use and Land Cover Changes under Climate Uncertainty: Modelling the Impacts on Hydropower Production in Western Africa

    Directory of Open Access Journals (Sweden)

    Salomon Obahoundje

    2017-01-01

    Full Text Available The Bui hydropower plant plays a vital role in the socio-economic development of Ghana. This paper attempt to explore the combined effects of climate-land use land cover change on power production using the (WEAP model: Water Evaluation and Planning system. The historical analysis of rainfall and stream flow variability showed that the annual coefficient of variation of rainfall and stream flow are, respectively, 8.6% and 60.85%. The stream flow varied greatly than the rainfall, due to land use land cover changes (LULC. In fact, the LULC analysis revealed important changes in vegetative areas and water bodies. The WEAP model evaluation showed that combined effects of LULC and climate change reduce water availability for all of demand sectors, including hydropower generation at the Bui hydropower plant. However, it was projected that Bui power production will increase by 40.7% and 24.93%, respectively, under wet and adaptation conditions, and decrease by 46% and 2.5%, respectively, under dry and current conditions. The wet condition is defined as an increase in rainfall by 14%, the dry condition as the decrease in rainfall by 15%; current account is business as usual, and the adaptation is as the efficient use of water for the period 2012–2040.

  18. The uranium industry: long-term planning for short-term competition

    International Nuclear Information System (INIS)

    Vottero, X.; Georges Capus, G.

    2001-01-01

    Long term planning for short term competition Today, uranium producers face new challenges in terms of both production (new regulatory, environmental and social constraints) and market conditions (new sources of uranium supply, very low prices and tough competition). In such a context, long-term planning is not just a prerequisite to survive in the nuclear fuel cycle industry. In fact, it also contributes to sustaining nuclear electricity generation facing fierce competition from other energy sources in increasingly deregulated markets. Firstly, the risk of investing in new mining projects in western countries is growing because, on the one hand, of very erratic market conditions and, on the other hand, of increasingly lengthy, complex and unpredictable regulatory conditions. Secondly, the supply of other sources of uranium (uranium derived from nuclear weapons, uranium produced in CIS countries, ...) involve other risks, mainly related to politics and commercial restrictions. Consequently, competitive uranium supply requires not only technical competence but also financial strength and good marketing capabilities in order to anticipate long-term market trends, in terms of both demand and supply. It also requires taking into account new parameters such as politics, environment, regulations, etc. Today, a supplier dedicated to the sustainable production of nuclear electricity must manage a broad range of long-term risks inherent to the procurement of uranium. Taking into account all these parameters in a context of short-term, fast-changing market is a great challenge for the future generation. World Uranium Civilian Supply and Demand. (authors)

  19. Environmental certification for small hydropower plants

    International Nuclear Information System (INIS)

    Truffer, B.; Meier, W.; Vollenweider, S.; Seiler, B.; Dettli, R.

    2001-01-01

    This report for the Swiss Federal Institute for Environmental Science and Technology describes product-differentiation options for small hydropower plant in Switzerland and proposes a form of differentiation based on ecological characteristics as a promising market strategy. The labels created in various countries to assure customers of the environmental compatibility of 'green' power production are looked at. In particular, the implications for small hydropower plant associated with the Swiss green power labelling procedure introduced by the Association for the Promotion of Environmentally Sound Electricity (VUE) are discussed. The report proposes a simplified procedure for these small power stations and presents a sample calculation for the overall costs of certification. The report is rounded off with four detailed case studies in which the necessary upgrades to the plant and associated costs are discussed in detail

  20. Operation of hydropower generation systems in the Alps under future climate and socio-economic drivers

    Science.gov (United States)

    Anghileri, Daniela; Castelletti, Andrea; Burlando, Paolo

    2015-04-01

    describes the behavior of hydropower operators. This integrated model allows to quantitatively explore possible trajectories of future evolution of the hydropower systems under the combined effect of climate and socio-economic drivers. In a multi-objective perspective, the model can test how different hydropower operation strategies perform in terms of power production, reliability and flexibility of supply, profitability of operation, and ecosystem conservation. This contribution presents the methodological framework designed to formulate the integrated model, its expected outcomes, and some preliminary results on a pilot study.

  1. DOE Hydropower Program Annual Report for FY 2002

    Energy Technology Data Exchange (ETDEWEB)

    Garold L. Sommers; R. T. Hunt

    2003-07-01

    The U.S. Department of Energy (DOE) conducts research on advanced hydropower technology through its hydropower program, which is organized under the Office of Wind and Hydropower Technologies within the Office of Energy Efficiency and Renewable Energy. This annual report describes the various projects supported by the hydropower program in FY 2002. The program=s current focus is on improving the environmental performance of hydropower projects by addressing problems such as fish mortality during passage through turbines, alteration of instream habitat, and water quality in tailwaters. A primary goal of this research is to develop new, environmentally friendly technology. DOE-funded projects have produced new conceptual designs for turbine systems, and these are now being tested in pilot-scale laboratory tests and in the field. New design approaches range from totally new turbine runners to modifications of existing designs. Biological design criteria for these new turbines have also been developed in controlled laboratory tests of fish response to physical stresses, such as hydraulic shear and pressure changes. These biocriteria are being combined with computational tools to locate and eliminate areas inside turbine systems that are damaging to fish. Through the combination of laboratory, field, and computational studies, new solutions are being found to environmental problems at hydropower projects. The diverse program activities continue to make unique contributions to clean energy production in the U.S. By working toward technology improvements that can reduce environmental problems, the program is helping to reposition hydropower as an acceptable, renewable, domestic energy choice.

  2. Long-Term Scheduling of Large-Scale Cascade Hydropower Stations Using Improved Differential Evolution Algorithm

    Directory of Open Access Journals (Sweden)

    Xiaohao Wen

    2018-03-01

    Full Text Available Long-term scheduling of large cascade hydropower stations (LSLCHS is a complex problem of high dimension, nonlinearity, coupling and complex constraint. In view of the above problem, we present an improved differential evolution (iLSHADE algorithm based on LSHADE, a state-of-the-art evolutionary algorithm. iLSHADE uses new mutation strategies “current to pbest/2-rand” to obtain wider search range and accelerate convergence with the preventing individual repeated failure evolution (PIRFE strategy. The handling of complicated constraints strategy of ε-constrained method is presented to handle outflow, water level and output constraints in the cascade reservoir operation. Numerical experiments of 10 benchmark functions have been done, showing that iLSHADE has stable convergence and high efficiency. Furthermore, we demonstrate the performance of the iLSHADE algorithm by comparing it with other improved differential evolution algorithms for LSLCHS in four large hydropower stations of the Jinsha River. With the applications of iLSHADE in reservoir operation, LSLCHS can obtain more power generation benefit than other alternatives in dry, normal, and wet years. The results of numerical experiments and case studies show that the iLSHADE has a distinct optimization effect and good stability, and it is a valid and reliable tool to solve LSLCHS problem.

  3. Coherence between institutions and technologies - The case of mini hydropower in Switzerland

    OpenAIRE

    Crettenand, Nicolas

    2009-01-01

    Switzerland, with the forecasted electricity gap between domestic production and demand, aims to significantly increase renewable energy sources including hydropower. Mini hydropower (below 1MW) currently has considerable unused technical potential. As a renewable energy source (RES) it can contribute to climate change mitigation. CO2-taxes or emission trading systems (ETS) for planned thermal power plants could help facilitate mini hydropower (MHP). The technology is mature, but requires ade...

  4. Climate change impact on the discharge in meso-scale catchments and consequences for the hydropower-production in Switzerland

    Science.gov (United States)

    Rössler, Ole; Hänggi, Pascal; Köplin, Nina; Meyer, Rapahel; Schädler, Bruno; Weingartner, Rolf

    2013-04-01

    The potential effect of climate change on hydrology is the acceleration of the hydrological cycle that in turn will likely cause changes in the discharge regime. As a result, socio-economic systems (e.g., tourism, hydropower industry) may be drastically affected. In this study, we comprehensively analyzed the effect of climate change on different hydrological components like mean and low-flow levels, and drought stress in mesoscale catchments of Switzerland. In terms of mean flows approx. 200 catchments in Switzerland were simulated for the reference period 1984-2005 using the hydrological model PREVAH and projection for near (2025-2046) and far future (2074-2095) are based on delta-change values of 10 ENSEMBLES regional climate models assuming A1B emission scenario (CH2011 climate scenario data sets). We found seven distinct response types of catchments, each exhibiting a characteristic annual cycle of hydrologic change. A general pattern observed for all catchments, is the clearly decreasing summer runoff. Hence, within a second analysis of future discharge a special focus was set on summer low flow in a selection of 29 catchments in the Swiss Midlands. Low flows are critical as they have great implications on water usage and biodiversity. We re-calibrated the hydrological model PREVAH with a focus on base-flow and gauged discharge and used the aforementioned climate data sets and simulation time periods. We found low flow situations to be very likely to increase in both, magnitude and duration, especially in central and western Switzerland plateau. At third, the drought stress potential was analyzed by simulating the soil moisture level under climate change conditions in a high mountain catchment. We used the distributed hydrological model WaSiM-ETH for this aspect as soil characteristics are much better represented in this model. Soil moisture in forests below 2000 m a.s.l. were found to be affected at most, which might have implication to their function as

  5. EPRI-DOE Conference on Environmentally-Enhanced Hydropower Turbines: Technical Papers

    Energy Technology Data Exchange (ETDEWEB)

    Hogan, T. [Alden Research Laboratory, Inc., Holden, MA (United States)

    2011-12-01

    The EPRI-DOE Conference on Environmentally-Enhanced Hydropower Turbines was a component of a larger project. The goal of the overall project was to conduct the final developmental engineering required to advance the commercialization of the Alden turbine. As part of this effort, the conference provided a venue to disseminate information on the status of the Alden turbine technology as well as the status of other advanced turbines and research on environmentally-friendly hydropower turbines. The conference was also a product of a federal Memorandum of Understanding among DOE, USBR, and USACE to share technical information on hydropower. The conference was held in Washington, DC on May 19 and 20, 2011 and welcomed over 100 attendees. The Conference Organizing Committee included the federal agencies with a vested interest in hydropower in the U.S. The Committee collaboratively assembled this conference, including topics from each facet of the environmentally-friendly conventional hydropower research community. The conference was successful in illustrating the readiness of environmentally-enhanced hydropower technologies. Furthermore, the topics presented illustrated the need for additional deployment and field testing of these technologies in an effort to promote the growth of environmentally sustainable hydropower in the U.S. and around the world.

  6. Socio-environmental integration of hydropower facilities

    International Nuclear Information System (INIS)

    Harby, Atle; Forseth, Torbjoern; Ruud, Audun; Bakken, Tor Haakon

    2017-01-01

    Centre for Environmental Design of Renewable Energy (CEDREN) is a research centre focusing on hydropower production and environmental impacts of hydropower. The main objective of CEDREN is to develop and communicate design solutions for renewable energy production that address environmental and societal challenges at local, regional, national and global levels. Environmental design means that planning, building and operation have to include technical, economic, environmental and socio-political aspects throughout the whole life-span of the project. Methods and tools to ensure environmental design are developed in CEDREN and applied to case studies in Norway and internationally. These methods and tools focus on finding physical and biological bottlenecks for affected species and ecosystems by mapping, modelling and analysis of both physical conditions and ecological status. CEDREN proposes different measures, tools and methods to improve the environmental conditions as well as how to maintain or increase the power production. In addition, a strong focus must be made on political governance to ensure more representative participation of relevant stakeholders in the process of finding the best technical, economic and political solutions for power production, the environment and the society. Key research findings used to develop relationships between physical factors like flow, flow fluctuations, water temperature, water velocity, water depth and water-covered area and biological response will be shown. Examples of improved methods for better planning procedures with stakeholder engagement will be proposed. Examples of methods and tools for environmental design of hydropower will be given for several regulated rivers in Norway and abroad. (authors)

  7. Hidroenergia 2010: International congress on small hydropower. Conference report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    This conference, held in 2010 in Lausanne, Switzerland, gathered together the main stakeholders of the small hydropower community to debate about topics affecting the development of the sector, to exchange experience and to present new advances in the technological area. The two-day conference was held in a total of nine sessions, a poster session and a workshop. The first session was dedicated to water management in the Alps and covered new regulations, administrative procedures and finance issues. Contributions included a review of the present situation and the development of common guidelines to meet the challenge of conflicting technical and environmental objectives, the facilitation of small hydropower in Switzerland and the institutional frameworks involved, recent trends in small hydro project financing and the growing roles of venture capital, private equity and changing market dynamics. Finally the prospects for small hydropower in Serbia were discussed. In two parallel sessions the following topics were looked at: The promotion of small hydropower in Switzerland using various sources of water and remuneration for the power produced, small hydro in the Canton of Vaud, Switzerland, the use of karst groundwater for the underground production of power were looked at as well as the analysis of hydraulic facilities for combining pumped storage hydropower systems and wind power in Austria. The final presentation took a look at the new 'La Tzintre' hydropower project. The parallel session dealt with technical innovations and engineering solutions with presentations on the development of small diagonal turbines, the adaptation of propeller turbines to higher specific needs and the problems encountered in doing so. The use of centrifugal pumps as turbines, including a review of technology and applications were also dealt with. Two further parallel sessions looked at EU-funded projects and sustainability issues. The Sustainable Energy Europe project was

  8. Combined heat and power production planning in a waste-to-energy plant on a short-term basis

    International Nuclear Information System (INIS)

    Touš, Michal; Pavlas, Martin; Putna, Ondřej; Stehlík, Petr; Crha, Lukáš

    2015-01-01

    In many cases, WtE (waste-to-energy) plants are CHP (combined heat and power) producers. They are often integrated into a central heating system and they also export electricity to the grid. Therefore, they have to plan their operation on a long-term basis (months, years) as well as on a short-term basis (hours, days). Simulation models can effectively support decision making in CHP production planning. In general, CHP production planning on a short-term basis is a challenging task for WtE plants. This article presents a simulation based support. It is demonstrated on an example involving a real WtE plant. Most of the models of relevant WtE sub-systems (boilers, steam turbine) are developed using operational data and applying linear regression and artificial neural network technique. The process randomness given mainly by fluctuating heating value of waste leads to uncertainty in a calculation of CHP production and a stochastic approach is appropriate. The models of the sub-systems are, therefore, extended of a stochastic part and Monte-Carlo simulation is applied. Compared to the current planning strategy in the involved WtE plant, the stochastic simulation based planning provides increased CHP production resulting in better net thermal efficiency and increased revenue. This is demonstrated through a comparison using real operational data. - Highlights: • Introduction of a stochastic model of a CHP production in a waste-to-energy plant. • An application of the model for the next day CHP production planning. • Better net thermal efficiency and therefore increased revenue achieved.

  9. Optimization of the energy production for the Baghdara hydropower plant in Afghanistan using simulated annealing; Optimierung der Energieerzeugung fuer das Wasserkraftwerk Baghdara in Afghanistan mit simulated annealing

    Energy Technology Data Exchange (ETDEWEB)

    Ayros, E.; Hildebrandt, H.; Peissner, K. [Fichtner GmbH und Co. KG, Stuttgart (Germany). Wasserbau und Wasserkraftwerke; Bardossy, A. [Stuttgart Univ. (Germany). Inst. fuer Wasserbau

    2008-07-01

    Simulated Annealing (SA) is an optimization method analogous to the thermodynamic method and is a new alternative for optimising the energy production of hydropower systems with storage capabilities. The SA-Algorithm is presented here and it was applied for the maximization of the energy production of the Baghdara hydropower plant in Afghanistan. The results were also compared with a non-linear optimization method NLP. (orig.)

  10. Hydropower Baseline Cost Modeling, Version 2

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, Patrick W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-09-01

    Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gaps in publically available hydropower cost estimating tools that can support the national-scale evaluation of hydropower resources.

  11. Impacts of climate change on water resources and hydropower systems in central and southern Africa

    Energy Technology Data Exchange (ETDEWEB)

    Hamududu, Byman H

    2012-11-15

    Climate change is altering hydrological processes with varying degrees in various regions of the world. This research work investigates the possible impacts of climate change on water resource and Hydropower production potential in central and southern Africa. The Congo, Zambezi and Kwanza, Shire, Kafue and Kabompo basins that lie in central and southern Africa are used as case studies. The review of climate change impact studies shows that there are few studies on impacts of climate change on hydropower production. Most of these studies were carried out in Europe and north America and very few in Asia, south America and Africa. The few studies indicate that southern Africa would experience reduction in precipitation and runoff, consequently reductions in hydropower production. There are no standard methods of assessing the resulting impacts. Two approaches were used to assess the impacts of climate change on water resources and hydropower. One approach is lumping changes on country or regional level and use the mean climate changes on mean annual flows as the basis for regional changes in hydropower production. This is done to get an overall picture of the changes on global and regional level. The second approach is a detailed assessment process in which downscaling, hydrological modelling and hydropower simulations are carried out. The possible future climate scenarios for the region of central and southern Africa depicted that some areas where precipitation are likely to have increases while other, precipitation will reduce. The region northern Zambia and southern Congo showed increases while the northern Congo basin showed reductions. Further south in southern African region, there is a tendency of decreases in precipitation. To the west, in Angola, inland showed increases while towards the coast highlighted some decreases in precipitation. On a global scale, hydropower is likely to experience slight changes (0.08%) due to climate change by 2050. Africa is

  12. 78 FR 14528 - Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of Application for Transfer of License, and...

    Science.gov (United States)

    2013-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11169-029] Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On November 20, 2012, Mayo Hydropower, LLC (transferor) and Avalon Hydropower...

  13. The impacts of climate change on a Norwegian high-head hydropower plant

    Energy Technology Data Exchange (ETDEWEB)

    Chernet, Haregewoin Haile; Alfredsen, Knut; Killintveit, Aanund

    2010-07-01

    Full text: Norway relies on hydropower for 99 percent of the electricity production and thus Hydropower is important for Norway today and in the future energy system. The work presented in this paper shows how a high-head hydropower system in Norway will be affected in the future climate. The Aurland Hydropower system, operated by E-Co Vannkraft, Norway is the test case for the study. The Aurland hydropower system has many reservoirs and transfer systems and is considered to be one of the complex systems in Norway, but also a typical example of a Norwegian high head system. The nMAG Hydropower simulation model, which has been developed at the Norwegian Hydro technical Laboratory, is used to simulate the hydropower system. Historical and future inflow series were transposed from the neighbouring catchment Flaamselvi using scaling based on area and specific runoff, as there is no discharge station in Aurland catchment with long unregulated inflow series to set up the model and to be used for developing future climate scenarios. To generate the future inflow series for the analysis, the HBV hydrological model is calibrated for the Flaamselvi catchment. The model is then used to generate future inflow series of using the Hadley GCM (HADAm3) and A2, B2 climate scenarios. The operation of the hydropower system is then simulated for the period 2071 -2100 to see how future power production is affected by the change in the inflow conditions. The HBV model is also used to see how snow accumulation will be affected in the future as snow melt is important for Norwegian reservoir and hydropower systems. The Hydrologic scenarios under climate change imply an average increase in runoff for the system. Snow accumulation will decrease with sooner snow melt and more winter precipitation as rain. The hydropower simulation results show that associated with the increase in runoff there is an increase in energy generation with 10-20% under the current reservoir operation strategies

  14. 2014 Hydropower Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Rocío Uría-Martínez, Patrick W. O’Connor, Megan M. Johnson

    2015-04-30

    The U.S. hydropower fleet has been providing clean, reliable power for more than a hundred years. However, no systematic documentation exists of the U.S. fleet and the trends influencing it in recent years. This first-ever Hydropower Market Report seeks to fill this gap and provide industry and policy makers with a quantitative baseline on the distribution, capabilities, and status of hydropower in the United States.

  15. Hydropower versus irrigation—an analysis of global patterns

    Science.gov (United States)

    Zeng, Ruijie; Cai, Ximing; Ringler, Claudia; Zhu, Tingju

    2017-03-01

    Numerous reservoirs around the world provide multiple flow regulation functions; key among these are hydroelectricity production and water releases for irrigation. These functions contribute to energy and food security at national, regional and global levels. While reservoir operations for hydroelectricity production might support irrigation, there are also well-known cases where hydroelectricity production reduces water availability for irrigated food production. This study assesses these relationships at the global level using machine-learning techniques and multi-source datasets. We find that 54% of global installed hydropower capacity (around 507 thousand Megawatt) competes with irrigation. Regions where such competition exists include the Central United States, northern Europe, India, Central Asia and Oceania. On the other hand, 8% of global installed hydropower capacity (around 79 thousand Megawatt) complements irrigation, particularly in the Yellow and Yangtze River Basins of China, the East and West Coasts of the United States and most river basins of Southeast Asia, Canada and Russia. No significant relationship is found for the rest of the world. We further analyze the impact of climate variables on the relationships between hydropower and irrigation. Reservoir flood control functions that operate under increased precipitation levels appear to constrain hydroelectricity production in various river basins of the United States, South China and most basins in Europe and Oceania. On the other hand, increased reservoir evaporative losses and higher irrigation requirements due to higher potential evaporation levels may lead to increased tradeoffs between irrigation and hydropower due to reduced water availability in regions with warmer climates, such as India, South China, and the Southern United States. With most reservoirs today being built for multiple purposes, it is important for policymakers to understand and plan for growing tradeoffs between key

  16. Trade-offs Between Electricity Production from Small Hydropower Plants and Ecosystem Services in Alpine River Basins

    Science.gov (United States)

    Meier, Philipp; Schwemmle, Robin; Viviroli, Daniel

    2015-04-01

    The need for a reduction in greenhouse gas emissions and the decision to phase out nuclear power plants in Switzerland and Germany increases pressure to develop the remaining hydropower potential in Alpine catchments. Since most of the potential for large reservoirs is already exploited, future development focusses on small run-of-the-river hydropower plants (SHP). Being considered a relatively environment-friendly electricity source, investment in SHP is promoted through subsidies. However, SHP can have a significant impact on riverine ecosystems, especially in the Alpine region where residual flow reaches tend to be long. An increase in hydropower exploitation will therefore increase pressure on ecosystems. While a number of studies assessed the potential for hydropower development in the Alps, two main factors were so far not assessed in detail: (i) ecological impacts within a whole river network, and (ii) economic conditions under which electricity is sold. We present a framework that establishes trade-offs between multiple objectives regarding environmental impacts, electricity production and economic evaluation. While it is inevitable that some ecosystems are compromised by hydropower plants, the context of these impacts within a river network should be considered when selecting suitable sites for SHP. From an ecological point of view, the diversity of habitats, and therefore the diversity of species, should be maintained within a river basin. This asks for objectives that go beyond lumped parameters of hydrological alteration, but also consider habitat diversity and the spatial configuration. Energy production in run-of-the-river power plants depends on available discharge, which can have large fluctuations. In a deregulated electricity market with strong price variations, an economic valuation should therefore be based on the expected market value of energy produced. Trade-off curves between different objectives can help decision makers to define policies

  17. Environmental sustainability assessment of hydropower plant in Europe using life cycle assessment

    Science.gov (United States)

    Mahmud, M. A. P.; Huda, N.; Farjana, S. H.; Lang, C.

    2018-05-01

    Hydropower is the oldest and most common type of renewable source of electricity available on this planet. The end of life process of hydropower plant have significant environmental impacts, which needs to be identified and minimized to ensure an environment friendly power generation. However, identifying the environmental impacts and health hazards are very little explored in the hydropower processing routes despite a significant quantity of production worldwide. This paper highlight the life-cycle environmental impact assessment of the reservoir based hydropower generation system located in alpine and non-alpine region of Europe, addressing their ecological effects by the ReCiPe and CML methods under several impact-assessment categories such as human health, ecosystems, global warming potential, acidification potential, etc. The Australasian life-cycle inventory database and SimaPro software are utilized to accumulate life-cycle inventory dataset and to evaluate the impacts. The results reveal that plants of alpine region offer superior environmental performance for couple of considered categories: global warming and photochemical oxidation, whilst in the other cases the outcomes are almost similar. Results obtained from this study will take part an important role in promoting sustainable generation of hydropower, and thus towards environment friendly energy production.

  18. Handling geological and economic uncertainties in balancing short-term and long-term objectives in waterflooding optimization

    NARCIS (Netherlands)

    Siraj, M.M.; Van Den Hof, P.M.J.; Jansen, J.D.

    2017-01-01

    Model-based economic optimization of oil production has a significant scope to increase financial life-cycle performance. The net-present-value (NPV) objective in this optimization, because of its nature, focuses on long-term gains, whereas short-term production is not explicitly addressed. At the

  19. Multi-model assessment of global hydropower and cooling water discharge potential under climate change

    NARCIS (Netherlands)

    van Vliet, M. T H; van Beek, L. P H|info:eu-repo/dai/nl/14749799X; Eisner, S.; Flörke, M.; Wada, Y.|info:eu-repo/dai/nl/341387819; Bierkens, M. F P|info:eu-repo/dai/nl/125022794

    2016-01-01

    Worldwide, 98% of total electricity is currently produced by thermoelectric power and hydropower. Climate change is expected to directly impact electricity supply, in terms of both water availability for hydropower generation and cooling water usage for thermoelectric power. Improved understanding

  20. Multi-model assessment of global hydropower and cooling water discharge potential under climate change

    NARCIS (Netherlands)

    Vliet, van M.T.H.; Beek, van L.P.H.; Eisner, S.; Flörke, M.; Wada, Y.; Bierkens, M.F.P.

    2016-01-01

    Worldwide, 98% of total electricity is currently produced by thermoelectric power and hydropower. Climate change is expected to directly impact electricity supply, in terms of both water availability for hydropower generation and cooling water usage for thermoelectric power. Improved

  1. Future hydropower production in the Lower Zambezi under possible ...

    African Journals Online (AJOL)

    2014-01-15

    Jan 15, 2014 ... The results show the importance of considering climate risk in technical design and financial assessment of hydropower projects in the region. ... but only report overall trends for Mozambique. Therefore, in addition to .... and lateral inflow of intermediate catchments to the down- stream reservoirs. In addition ...

  2. Pediatric polytrauma : Short-term and long-term outcomes

    NARCIS (Netherlands)

    vanderSluis, CK; Kingma, J; Eisma, WH; tenDuis, HJ

    Objective: To assess the short-term and long-term outcomes of pediatric polytrauma patients and to analyze the extent to which short-term outcomes can predict long-term outcomes. Materials and Methods: Ail pediatric polytrauma patients (Injury Severity Score of greater than or equal to 16, less than

  3. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  4. Model and economic uncertainties in balancing short-term and long-term objectives in water-flooding optimization.

    NARCIS (Netherlands)

    Siraj, M.M.; Hof, Van den P.M.J.; Jansen, J.D.

    2015-01-01

    Model-based optimization of oil production has a significant scope to increase ultimate recovery or financial life-cycle performance. The Net Present Value (NPV) objective in such an optimization framework, because of its nature, focuses on the long-term gains while the short-term production is not

  5. Assessing Climate Change Impacts on Global Hydropower

    Directory of Open Access Journals (Sweden)

    Aanund Killingtveit

    2012-02-01

    Full Text Available Currently, hydropower accounts for close to 16% of the world’s total power supply and is the world’s most dominant (86% source of renewable electrical energy. The key resource for hydropower generation is runoff, which is dependent on precipitation. The future global climate is uncertain and thus poses some risk for the hydropower generation sector. The crucial question and challenge then is what will be the impact of climate change on global hydropower generation and what are the resulting regional variations in hydropower generation potential? This paper is a study that aims to evaluate the changes in global hydropower generation resulting from predicted changes in climate. The study uses an ensemble of simulations of regional patterns of changes in runoff, computed from global circulation models (GCM simulations with 12 different models. Based on these runoff changes, hydropower generation is estimated by relating the runoff changes to hydropower generation potential through geographical information system (GIS, based on 2005 hydropower generation. Hydropower data obtained from EIA (energy generation, national sites, FAO (water resources and UNEP were used in the analysis. The countries/states were used as computational units to reduce the complexities of the analysis. The results indicate that there are large variations of changes (increases/decreases in hydropower generation across regions and even within regions. Globally, hydropower generation is predicted to change very little by the year 2050 for the hydropower system in operation today. This change amounts to an increase of less than 1% of the current (2005 generation level although it is necessary to carry out basin level detailed assessment for local impacts which may differ from the country based values. There are many regions where runoff and hydropower generation will increase due to increasing precipitation, but also many regions where there will be a decrease. Based on this

  6. Memorandum of Understanding for Hydropower Two-Year Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-04-01

    On March 24, 2010, the Department of the Army (DOA) through the U.S. Army Corps of Engineers (USACE or Corps), the Department of Energy, and the Department of the Interior signed the Memorandum of Understanding (MOU) for Hydropower. The purpose of the MOU is to “help meet the nation’s needs for reliable, affordable, and environmentally sustainable hydropower by building a long-term working relationship, prioritizing similar goals, and aligning ongoing and future renewable energy development efforts.” This report documents efforts so far.

  7. Greenhouse gas emissions from hydropower. The state of research in 1996

    International Nuclear Information System (INIS)

    Gagnon, L.; Vate, J.F. van de

    1997-01-01

    This paper reports on the findings of a recent IAEA expert meeting on the assessment of greenhouse gas (GHG) emissions from the full 'lifecycle' of hydropower. It discusses the different categories of hydropower plants in view of the two main sources of GHG emissions: first, direct and indirect emissions associated with the construction of the plants; second, emissions from decaying biomass from land flooded by hydro reservoirs. In terms of GHG emissions, this paper shows that, in most cases, hydropower is a good alternative to fossil fuelled power generation. For hydropower plants in cold climate, a typical GHG emission factor is 15 g CO 2 equivalent/kWh, which is 30-60 times less than the factors of usual fossil fuel generation. For some hydropower plants in tropical climates, theoretical calculations have shown that reservoir emissions could be very high. However, no measurements of emission were taken from tropical reservoirs and the current level of research does not allow for a reliable evaluation. Research is urgently needed in humid tropical climates. (author)

  8. Short term economic emission power scheduling of hydrothermal energy systems using improved water cycle algorithm

    International Nuclear Information System (INIS)

    Haroon, S.S.; Malik, T.N.

    2017-01-01

    Due to the increasing environmental concerns, the demand of clean and green energy and concern of atmospheric pollution is increasing. Hence, the power utilities are forced to limit their emissions within the prescribed limits. Therefore, the minimization of fuel cost as well as exhaust gas emissions is becoming an important and challenging task in the short-term scheduling of hydro-thermal energy systems. This paper proposes a novel algorithm known as WCA-ER (Water Cycle Algorithm with Evaporation Rate) to inspect the short term EEPSHES (Economic Emission Power Scheduling of Hydrothermal Energy Systems). WCA has its ancestries from the natural hydrologic cycle i.e. the raining process forms streams and these streams start flowing towards the rivers which finally flow towards the sea. The worth of WCA-ER has been tested on the standard economic emission power scheduling of hydrothermal energy test system consisting of four hydropower and three thermal plants. The problem has been investigated for the three case studies (i) ECS (Economic Cost Scheduling), (ii) ES (Economic Emission Scheduling) and (iii) ECES (Economic Cost and Emission Scheduling). The results obtained show that WCA-ER is superior to many other methods in the literature in bringing lower fuel cost and emissions. (author)

  9. Model based hydropower gate operation for mitigation of CSO impacts by means of river base flow increase.

    Science.gov (United States)

    Achleitner, S; De Toffol, S; Engelhard, C; Rauch, W

    2005-01-01

    In river stretches being subjected to flow regulation, usually for the purpose of energy production (e.g. Hydropower) or flood protection (river barrage), a special measure can be taken against the effect of combined sewer overflows (CSOs). The basic idea is the temporal increase of the river base flow (during storm weather) as an in-stream measure for mitigation of CSO spilling. The focus is the mitigation of the negative effect of acute pollution of substances. The measure developed can be seen as an application of the classic real time control (RTC) concept onto the river system. Upstream gate operation is to be based on real time monitoring and forecasting of precipitation. The main objective is the development of a model based predictive control system for the gate operation, by modelling of the overall wastewater system (incl. the receiving water). The main emphasis is put on the operational strategy and the appropriate short-term forecast of spilling events. The potential of the measure is tested for the application of the operational strategy and its ecological and economic feasibility. The implementation of such an in-stream measure into the hydropower's operational scheme is unique. Advantages are (a) the additional in-stream dilution of acute pollutants entering the receiving water and (b) the resulting minimization of the required CSO storage volume.

  10. Hydropower and Sustainable Development: A Journey

    Energy Technology Data Exchange (ETDEWEB)

    Schumann, Kristin; Saili, Lau; Taylor, Richard; Abdel-Malek, Refaat

    2010-09-15

    Hydropower produces 16% of our electricity; it is one of the world's major renewable energy resources. It is playing an important role in enabling communities around the world to meet their power and water needs. The pace of hydropower growth has been rapid but sometimes with little guidance to ensure development is based on sustainability principles. Some of the most promising initiatives to fill the void, such as the Hydropower Sustainability Assessment Protocol, have been driven by the hydropower sector itself. Efforts focus on carrying forward this momentum to obtain a tool for hydropower sustainability agreed across sectors and stakeholders.

  11. Addressing biogenic greenhouse gas emissions from hydropower in LCA.

    Science.gov (United States)

    Hertwich, Edgar G

    2013-09-03

    The ability of hydropower to contribute to climate change mitigation is sometimes questioned, citing emissions of methane and carbon dioxide resulting from the degradation of biogenic carbon in hydropower reservoirs. These emissions are, however, not always addressed in life cycle assessment, leading to a bias in technology comparisons, and often misunderstood. The objective of this paper is to review and analyze the generation of greenhouse gas emissions from reservoirs for the purpose of technology assessment, relating established emission measurements to power generation. A literature review, data collection, and statistical analysis of methane and CO2 emissions are conducted. In a sample of 82 measurements, methane emissions per kWh hydropower generated are log-normally distributed, ranging from micrograms to 10s of kg. A multivariate regression analysis shows that the reservoir area per kWh electricity is the most important explanatory variable. Methane emissions flux per reservoir area are correlated with the natural net primary production of the area, the age of the power plant, and the inclusion of bubbling emissions in the measurement. Even together, these factors fail to explain most of the variation in the methane flux. The global average emissions from hydropower are estimated to be 85 gCO2/kWh and 3 gCH4/kWh, with a multiplicative uncertainty factor of 2. GHG emissions from hydropower can be largely avoided by ceasing to build hydropower plants with high land use per unit of electricity generated.

  12. Long-term associative learning predicts verbal short-term memory performance

    OpenAIRE

    Jones, Gary; Macken, Bill

    2017-01-01

    Studies using tests such as digit span and nonword repetition have implicated short-term memory across a range of developmental domains. Such tests ostensibly assess specialized processes for the short-term manipulation and maintenance of information that are often argued to enable long-term learning. However, there is considerable evidence for an influence of long-term linguistic learning on performance in short-term memory tasks that brings into question the role of a specialized short-term...

  13. Long-term associative learning predicts verbal short-term memory performance.

    Science.gov (United States)

    Jones, Gary; Macken, Bill

    2018-02-01

    Studies using tests such as digit span and nonword repetition have implicated short-term memory across a range of developmental domains. Such tests ostensibly assess specialized processes for the short-term manipulation and maintenance of information that are often argued to enable long-term learning. However, there is considerable evidence for an influence of long-term linguistic learning on performance in short-term memory tasks that brings into question the role of a specialized short-term memory system separate from long-term knowledge. Using natural language corpora, we show experimentally and computationally that performance on three widely used measures of short-term memory (digit span, nonword repetition, and sentence recall) can be predicted from simple associative learning operating on the linguistic environment to which a typical child may have been exposed. The findings support the broad view that short-term verbal memory performance reflects the application of long-term language knowledge to the experimental setting.

  14. Quantifying the Value of Hydropower in the Electric Grid: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Key, T. [Electric Power Research Inst. (EPRI), Knovville, TN (United States); Rogers, L. [Electric Power Research Inst. (EPRI), Knovville, TN (United States); Brooks, D. [Electric Power Research Inst. (EPRI), Knovville, TN (United States); Tuohy, A. [Electric Power Research Inst. (EPRI), Knovville, TN (United States)

    2012-12-31

    The report summarizes research to Quantify the Value of Hydropower in the Electric Grid. This 3-year DOE study focused on defining value of hydropower assets in a changing electric grid. Methods are described for valuation and planning of pumped storage and conventional hydropower. The project team conducted plant case studies, electric system modeling, market analysis, cost data gathering, and evaluations of operating strategies and constraints. Five other reports detailing these research results are available a project website, www.epri.com/hydrogrid. With increasing deployment of wind and solar renewable generation, many owners, operators, and developers of hydropower have recognized the opportunity to provide more flexibility and ancillary services to the electric grid. To quantify value of services, this study focused on the Western Electric Coordinating Council region. A security-constrained, unit commitment and economic dispatch model was used to quantify the role of hydropower for several future energy scenarios up to 2020. This hourly production simulation considered transmission requirements to deliver energy, including future expansion plans. Both energy and ancillary service values were considered. Addressing specifically the quantification of pumped storage value, no single value stream dominated predicted plant contributions in various energy futures. Modeling confirmed that service value depends greatly on location and on competition with other available grid support resources. In this summary, ten different value streams related to hydropower are described. These fell into three categories; operational improvements, new technologies, and electricity market opportunities. Of these ten, the study was able to quantify a monetary value in six by applying both present day and future scenarios for operating the electric grid. This study confirmed that hydropower resources across the United States contribute significantly to operation of the grid in terms

  15. Modeling and dynamic behaviour of hydropower plants

    CERN Document Server

    Kishor, Nand

    2017-01-01

    This book presents a systematic approach to mathematical modeling of different configurations of hydropower plants over four sections - modeling and simulation approaches; control of hydropower plants; operation and scheduling of hydropower plants, including pumped storage; and special features of small hydropower plants.

  16. Hydropower Vision: Full Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-07-01

    Hydropower has provided clean, affordable, reliable, and renewable electricity in the United States for more than a century. Building on hydropower’s historical significance, and to inform the continued technical evolution, energy market value, and environmental performance of the industry, the U.S. Department of Energy’s (DOE’s) Wind and Water Power Technologies Office has led a first-of-its-kind comprehensive analysis focused on a set of potential pathways for the environmentally sustainable expansion of hydropower (hydropower generation and pumped storage) in the United States.

  17. Economic implications of climate-driven trends in global hydropower generation

    Science.gov (United States)

    Turner, S. W. D.; Galelli, S.; Hejazi, M. I.; Clarke, L.; Edmonds, J.; Kim, S. H.

    2017-12-01

    Recent progress in global scale hydrological and dam modeling has allowed for the study of climate change impacts on global hydropower production. Here we explore how these impacts could affect the composition of global electricity supply, and what those changes could mean for power sector emissions and investment needs in the 21st century. Regional hydropower projections are developed for two emissions scenarios by forcing a coupled global hydrological and dam model (1593 major hydropower dams; 54% global installed capacity) with downscaled, bias-corrected climate realizations derived from sixteen General Circulation Models (GCMs). To incorporate possible non-linearity in hydropower response to climate change, dam simulations incorporate plant specifications (e.g., maximum turbine flow), reservoir storage dynamics, reservoir bathymetry, evaporation losses and bespoke, site specific operations. Consequent impacts on regional and global-level electricity generation and associated emissions and investment costs are examined using the Global Change Assessment Model (GCAM). We show that changes in hydropower generation resulting from climate change can shift power demands onto and away from carbon intensive technologies, resulting in significant impacts on CO2 emissions for several regions. Many of these countries are also highly vulnerable to investment impacts (costs of new electricity generating facilities to make up for shortfalls in hydro), which in some cases amount to tens of billions of dollars by 2100. The Balkans region—typified by weak economies in a drying region that relies heavily on hydropower—emerges as the most vulnerable. Reduced impacts of climate change on hydropower production under a low emissions scenario coincide with increased costs of marginal power generating capacity (low emissions requires greater uptake of clean generating technologies, which are more expensive). This means impacts on power sector investment costs are similar for high

  18. Optimizing Reservoir-Stream-Aquifer Interactions for Conjunctive Use and Hydropower Production

    Directory of Open Access Journals (Sweden)

    Hala Fayad

    2012-01-01

    Full Text Available Conjunctive management of water resources involves coordinating use of surface water and groundwater resources. Very few simulation/optimization (S-O models for stream-aquifer system management have included detailed interactions between groundwater, streams, and reservoir storage. This paper presents an S-O model doing that via artificial neural network simulators and genetic algorithm optimizer for multiobjective conjunctive water use problems. The model simultaneously addresses all significant flows including reservoir-stream-diversion-aquifer interactions in a more detailed manner than previous models. The model simultaneously maximizes total water provided and hydropower production. A penalty function implicitly poses constraints on state variables. The model effectively finds feasible optimal solutions and the Pareto optimum. Illustrated is application for planning water resource and minihydropower system development.

  19. Hydropower strategy for the Philippines

    International Nuclear Information System (INIS)

    McCandless, D.H.

    1995-01-01

    The government-owned National Power Corporation (NPC) of the Philippines is in the early stages of a complete privatisation programme. The electric power sector is expected eventually to be structured around a company that will own the major transmission facilities and will serve as a broker of power and energy between generating companies and the existing distribution companies, Rural Electric Co-operations and other power users. NPC's non-transmission assets will probably be spun-off into various corporations including three generating companies, an engineering and services company and a company owning the Calivaya-Botocan-Kalayaan hydro complex. Plans for increased capacity include a real term increase in the hydropower contribution although it will decline as a percentage of the energy mix as coal and gas plants are developed. Details of the privatisation of specific hydropower projects in the Luzon, Visayas and Mindanao grids are described. (U.K.)

  20. Short-term and long-term effects of GDP on traffic deaths in 18 OECD countries, 1960-2011.

    Science.gov (United States)

    Dadgar, Iman; Norström, Thor

    2017-02-01

    Research suggests that increases in gross domestic product (GDP) lead to increases in traffic deaths plausibly due to the increased road traffic induced by an expanding economy. However, there also seems to exist a long-term effect of economic growth that is manifested in improved traffic safety and reduced rates of traffic deaths. Previous studies focus on either the short-term, procyclical effect, or the long-term, protective effect. The aim of the present study is to estimate the short-term and long-term effects jointly in order to assess the net impact of GDP on traffic mortality. We extracted traffic death rates for the period 1960-2011 from the WHO Mortality Database for 18 OECD countries. Data on GDP/capita were obtained from the Maddison Project. We performed error correction modelling to estimate the short-term and long-term effects of GDP on the traffic death rates. The estimates from the error correction modelling for the entire study period suggested that a one-unit increase (US$1000) in GDP/capita yields an instantaneous short-term increase in the traffic death rate by 0.58 (pGDP leads to an immediate increase in traffic deaths. However, after the mid-1970s this short-term effect is more than outweighed by a markedly stronger protective long-term effect, whereas the reverse is true for the period before the mid-1970s. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  1. Short-term scheduling of an open-pit mine with multiple objectives

    Science.gov (United States)

    Blom, Michelle; Pearce, Adrian R.; Stuckey, Peter J.

    2017-05-01

    This article presents a novel algorithm for the generation of multiple short-term production schedules for an open-pit mine, in which several objectives, of varying priority, characterize the quality of each solution. A short-term schedule selects regions of a mine site, known as 'blocks', to be extracted in each week of a planning horizon (typically spanning 13 weeks). Existing tools for constructing these schedules use greedy heuristics, with little optimization. To construct a single schedule in which infrastructure is sufficiently utilized, with production grades consistently close to a desired target, a planner must often run these heuristics many times, adjusting parameters after each iteration. A planner's intuition and experience can evaluate the relative quality and mineability of different schedules in a way that is difficult to automate. Of interest to a short-term planner is the generation of multiple schedules, extracting available ore and waste in varying sequences, which can then be manually compared. This article presents a tool in which multiple, diverse, short-term schedules are constructed, meeting a range of common objectives without the need for iterative parameter adjustment.

  2. Hydropower, an integral part of Canada's climate change strategy

    International Nuclear Information System (INIS)

    Fortin, P.

    1999-01-01

    The development and implementation of a climate change policy could be among the most far-reaching environmental initiatives ever embarked upon in Canada and abroad. If Canada is to stabilize or reduce its Greenhouse Gas (GHG) emissions over the long term, a significant adjustment to Canadian industry will be required as we move away from fossil fuel-intensive and GHG producing activities. Future hydroelectric projects provide Canada with a unique opportunity to significantly reduce the costs associated with stabilizing its GHG emissions. In addition, the energy storage and dispatchability associated with hydropower can support development of other low emitting renewable resources such as wind and solar. This document discusses the potential role of hydropower as a tool to reduce emissions, recommends action to reduce barriers facing hydropower and comments on some of the policy tools available to manage Canada's GHG emissions. (author)

  3. Association between intake of dairy products and short-term memory with and without adjustment for genetic and family environmental factors: A twin study.

    Science.gov (United States)

    Ogata, Soshiro; Tanaka, Haruka; Omura, Kayoko; Honda, Chika; Hayakawa, Kazuo

    2016-04-01

    Previous studies have indicated associations between intake of dairy products and better cognitive function and reduced risk of dementia. However, these studies did not adjust for genetic and family environmental factors that may influence food intake, cognitive function, and metabolism of dairy product nutrients. In the present study, we investigated the association between intake of dairy products and short-term memory with and without adjustment for almost all genetic and family environmental factors using a genetically informative sample of twin pairs. A cross-sectional study was conducted among twin pairs aged between 20 and 74. Short-term memory was assessed as primary outcome variable, intake of dairy products was analyzed as the predictive variable, and sex, age, education level, marital status, current smoking status, body mass index, dietary alcohol intake, and medical history of hypertension or diabetes were included as possible covariates. Generalized estimating equations (GEE) were performed by treating twins as individuals and regression analyses were used to identify within-pair differences of a twin pair to adjust for genetic and family environmental factors. Data are reported as standardized coefficients and 95% confidence intervals (CI). Analyses were performed on data from 78 men and 278 women. Among men, high intake of dairy products was significantly associated with better short-term memory after adjustment for the possible covariates (standardized coefficients = 0.22; 95% CI, 0.06-0.38) and almost all genetic and family environmental factors (standardized coefficients = 0.38; 95% CI, 0.07-0.69). Among women, no significant associations were found between intake of dairy products and short-term memory. Subsequent sensitivity analyses were adjusted for small samples and showed similar results. Intake of dairy product may prevent cognitive declines regardless of genetic and family environmental factors in men. Copyright © 2015 Elsevier Ltd

  4. Impaired short-term memory for pitch in congenital amusia.

    Science.gov (United States)

    Tillmann, Barbara; Lévêque, Yohana; Fornoni, Lesly; Albouy, Philippe; Caclin, Anne

    2016-06-01

    Congenital amusia is a neuro-developmental disorder of music perception and production. The hypothesis is that the musical deficits arise from altered pitch processing, with impairments in pitch discrimination (i.e., pitch change detection, pitch direction discrimination and identification) and short-term memory. The present review article focuses on the deficit of short-term memory for pitch. Overall, the data discussed here suggest impairments at each level of processing in short-term memory tasks; starting with the encoding of the pitch information and the creation of the adequate memory trace, the retention of the pitch traces over time as well as the recollection and comparison of the stored information with newly incoming information. These impairments have been related to altered brain responses in a distributed fronto-temporal network, associated with decreased connectivity between these structures, as well as in abnormalities in the connectivity between the two auditory cortices. In contrast, amusic participants׳ short-term memory abilities for verbal material are preserved. These findings show that short-term memory deficits in congenital amusia are specific to pitch, suggesting a pitch-memory system that is, at least partly, separated from verbal memory. This article is part of a Special Issue entitled SI: Auditory working memory. Copyright © 2015 Elsevier B.V. All rights reserved.

  5. Hydropower developments in Canada: number, size and jurisdictional and ecological distribution

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Peter G.; Hanneman, Matt; Cheng, Ryan [Global Forest Watch Canada (Canada)

    2011-08-15

    For over 200 years, energy production and consumption, along with all human activities, have been contributing to global warming. This report is part of a project that examines 10 major energy sectors to provide information on Canada's energy options in the face of climate change; this present study gives information on hydropower reservoirs and associated dams in Canada. The mapping, jurisdictional and ecological distribution of reservoirs and dams across Canada is provided herein. Canada's hydropower installations are composed of 271 large hydropower facilities covering 58,015 km2 with a capacity of 71,857 MW, accounting for 44% of Canada's total technical hydroelectric capacity. Quebec, Ontario and British Columbia are the provinces with the most large hydropower dams; 19% of the watersheds are occupied in part by hydropower reservoirs and the taiga shield, boreal shield and montane cordillera ecozones contain most of the reservoir areas. The majority of future developments are expected to be built within 5km of intact forest landscapes.

  6. Advanced inflow forecasting for a hydropower plant in an Alpine hydropower regulated catchment - coupling of operational and hydrological forecasts

    Science.gov (United States)

    Tilg, Anna-Maria; Schöber, Johannes; Huttenlau, Matthias; Messner, Jakob; Achleitner, Stefan

    2017-04-01

    Hydropower is a renewable energy source which can help to stabilize fluctuations in the volatile energy market. Especially pumped-storage infrastructures in the European Alps play an important role within the European energy grid system. Today, the runoff of rivers in the Alps is often influenced by cascades of hydropower infrastructures where the operational procedures are triggered by energy market demands, water deliveries and flood control aspects rather than by hydro-meteorological variables. An example for such a highly hydropower regulated river is the catchment of the river Inn in the Eastern European Alps, originating in the Engadin (Switzerland). A new hydropower plant is going to be built as transboundary project at the boarder of Switzerland and Austria using the water of the Inn River. For the operation, a runoff forecast to the plant is required. The challenge in this case is that a high proportion of runoff is turbine water from an upstream situated hydropower cascade. The newly developed physically based hydrological forecasting system is mainly capable to cover natural hydrological runoff processes caused by storms and snow melt but can model only a small degree of human impact. These discontinuous parts of the runoff downstream of the pumped storage are described by means of an additional statistical model which has been developed. The main goal of the statistical model is to forecast the turbine water up to five days in advance. The lead time of the data driven model exceeds the lead time of the used energy production forecast. Additionally, the amount of turbine water is linked to the need of electricity production and the electricity price. It has been shown that especially the parameters day-ahead prognosis of the energy production and turbine inflow of the previous week are good predictors and are therefore used as input parameters for the model. As the data is restricted due to technical conditions, so-called Tobit models have been used to

  7. Evaluation of short- and long-term fission product sources at the Fukushima Daiichi NPP

    International Nuclear Information System (INIS)

    Uchida, Shunsuke; Naitoh, Masanori; Suzuki, Hiroaki; Okada, Hidetoshi; Pellegrini, Marco; Achilli, Andrea; Hanamoto, Yukio; Sasaki, Hiroaki

    2014-01-01

    Research on fission product (FP) behaviors used to be one of the most important subjects in water chemistry but it is not done nowadays as a consequence of the increased integrity of nuclear fuels and the minimization of FP release into the environment. Evaluation of FP release into the environment is still one of the key issues for severe accident analysis, though. Although there have been a long quiet period in nuclear safety research, how to detect initiation of severe accidents, how to prevent them and how to mitigate them are still important subjects for nuclear engineering, and how to control the severe accidents after their occurrence, especially how to control FP release into the environment, has seldom been discussed in the water chemistry group recently. The paper is intended to address the issue of fewer activities for FP studies. FP sources are divided into two categories, short- and long-term FP sources. Short-term FP source can be evaluated based on the measured data obtained from monitoring posts (MPs), which give us clear evidence on the importance of radioactive iodine and cesium releases into the environment. It used to be considered that during primary containment vessel (PCV) venting, release of each element, e.g., iodine and cesium, was determined by the suppression pool scrubbing efficiency and most of the cesium would likely be removed in the pool due to its large scrubbing efficiency. But as a result of analyzing the MP data at early stage of the Fukushima Daiichi nuclear power plant (NPP) accident, it was confirmed that the releases of both elements were in proportion to their inventories in the reactors and their scrubbing efficiencies were almost the same. The scrubbing efficiency which increased with the pool water temperature became almost the same for iodine and cesium around the pool water boiling temperature. As a result of the mass balance analysis for FPs in the contaminated water accumulated in the Fukushima Daiichi plant site, it

  8. Environmental impact of hydropower systems

    International Nuclear Information System (INIS)

    Malai, Marius

    1996-01-01

    The installed hydropower potential of Romania is evaluated to 15,700 MW and 42 billion MWh/year power generation. Only 39% of this potential are currently being utilized. In this note, the impact of Somes-Tarnita and Mariselu-Cluj hydropower systems on the environment is presented. Also, the socio-economic effects on the local communities are considered. These two hydropower systems supply a total electric power of 470 GWh/year

  9. Hydropower recovery in water supply systems: Models and case study

    International Nuclear Information System (INIS)

    Vilanova, Mateus Ricardo Nogueira; Balestieri, José Antônio Perrella

    2014-01-01

    Highlights: • We present hydropower recovery models for water supply systems. • Hydropower recovery potential in water supply systems is highly variable. • The case studied could make the supply systems self-sufficient in terms of energy. • Hydropower recovery can reduce GHGs emissions and generate carbon credits. - Abstract: The energy efficiency of water supply systems can be increased through the recovery of hydraulic energy implicit to the volumes of water transported in various stages of the supply process, which can be converted into electricity through hydroelectric recovery systems. Such a process allows the use of a clean energy source that is usually neglected in water supplies, reducing its dependence on energy from the local network and the system’s operation costs. This article evaluates the possibilities and benefits of the use of water supply facilities, structures and equipment for hydraulic energy recovery, addressing several applicable hydroelectric models. A real case study was developed in Brazil to illustrate the technical, economic and environmental aspects of hydropower recovery in water supply systems

  10. Hydropower annual report 2003

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Dauble, Dennis D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hunt, Richard T. [Idaho National Lab. (INL), Idaho Falls, ID (United States). Idaho National Engineering Lab. (INEL); Sale, Michael J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sommers, Garold L. [Idaho National Lab. (INL), Idaho Falls, ID (United States). Idaho National Engineering Lab. (INEL)

    2004-02-01

    This report describes hydropower activities supported by the U.S. Department of Energy (DOE) Wind and Hydropower Program during Fiscal Year 2003 (October 1, 2002 to September 30, 2003). Background on the program, FY03 accomplishments, and future plans are presented in the following sections.

  11. U.S. Hydropower Resource Assessment - California

    Energy Technology Data Exchange (ETDEWEB)

    A. M. Conner; B. N. Rinehart; J. E. Francfort

    1998-10-01

    The U.S. Department of Energy is developing an estimate of the underdeveloped hydropower potential in the United States. For this purpose, the Idaho National Engineering and Environmental Laboratory developed a computer model called Hydropower Evaluation Software (HES). HES measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of California.

  12. US Hydropower Resource Assessment for Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.

    1995-07-01

    The Department of Energy is developing an estimate of the undeveloped hydropower potential in the United States. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the Commonwealth of Massachusetts.

  13. The importance of hydropower in Austria

    International Nuclear Information System (INIS)

    Kobau, R.; Pirker, O.; Spolwind, R.; Weiss, B.

    2009-01-01

    This article discusses the importance of hydropower-based power generation in Austria as a clean and emission-free source of electricity. The contribution made to total electricity generation is examined and figures are quoted. Hydropower is provided from both storage dams and run-of-river power stations such as those on the river Danube. The use of the various types of hydropower in connection with their economic optimisation, for example for the supply of valuable peak power, is discussed. The promotion of hydropower within the scope of European climate-protection efforts is examined. Projects concerning the augmentation of hydropower capacities are discussed and three exemplary projects are briefly described. Finally, the situation in Austria is compared with that to be found in neighbouring Switzerland.

  14. US hydropower resource assessment for Texas

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.

    1993-12-01

    The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Texas.

  15. US hydropower resource assessment for Montana

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.

    1993-12-01

    The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Montana.

  16. US hydropower resource assessment for Kansas

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.

    1993-12-01

    The Department of Energy is developing an estimate of the hydropower development potential in this country. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The HES measures the potential hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a dBASE menu-driven software application that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the state of Kansas.

  17. Long-Range Lightning Products for Short Term Forecasting of Tropical Cyclogenesis

    Science.gov (United States)

    Businger, S.; Pessi, A.; Robinson, T.; Stolz, D.

    2010-12-01

    This paper will describe innovative graphical products derived in real time from long-range lightning data. The products have been designed to aid in short-term forecasting of tropical cyclone development for the Tropical Cyclone Structure Experiment 2010 (TCS10) held over the western Pacific Ocean from 17 August to 17 October 2010 and are available online at http://www.soest.hawaii.edu/cgi-bin/pacnet/tcs10.pl. The long-range lightning data are from Vaisala’s Global Lightning Data 360 (GLD360) network and include time, location, current strength, polarity, and data quality indication. The products currently provided in real time include i. Infrared satellite imagery overlaid with lighting flash locations, with color indication of current strength and polarity (shades of blue for negative to ground and red for positive to ground). ii. A 15x15 degree storm-centered tile of IR imagery overlaid with lightning data as in i). iii. A pseudo reflectivity product showing estimates of radar reflectivity based on lightning rate - rain rate conversion derived from TRMM and PacNet data. iv. A lightning history product that plots each hour of lightning flash locations in a different color for a 12-hour period. v. Graphs of lightning counts within 50 or 300 km radius, respectively, of the storm center vs storm central sea-level pressure. vi. A 2-D graphic showing storm core lightning density along the storm track. The first three products above can be looped to gain a better understanding of the evolution of the lightning and storm structure. Examples of the graphics and their utility will be demonstrated and discussed. Histogram of lightning counts within 50 km of the storm center and graph of storm central pressure as a function of time.

  18. Metaheuristic Approaches for Hydropower System Scheduling

    Directory of Open Access Journals (Sweden)

    Ieda G. Hidalgo

    2015-01-01

    Full Text Available This paper deals with the short-term scheduling problem of hydropower systems. The objective is to meet the daily energy demand in an economic and safe way. The individuality of the generating units and the nonlinearity of their efficiency curves are taken into account. The mathematical model is formulated as a dynamic, mixed integer, nonlinear, nonconvex, combinatorial, and multiobjective optimization problem. We propose two solution methods using metaheuristic approaches. They combine Genetic Algorithm with Strength Pareto Evolutionary Algorithm and Ant Colony Optimization. Both approaches are divided into two phases. In the first one, to maximize the plant’s net generation, the problem is solved for each hour of the day (static dispatch. In the second phase, to minimize the units’ switching on-off, the day is considered as a whole (dynamic dispatch. The proposed methodology is applied to two Brazilian hydroelectric plants, in cascade, that belong to the national interconnected system. The nondominated solutions from both approaches are presented. All of them meet demand respecting the physical, electrical, and hydraulic constraints.

  19. Mitigation of short-term disturbance negative impacts in the agent-based model of a production companies network

    Science.gov (United States)

    Shevchuk, G. K.; Berg, D. B.; Zvereva, O. M.; Medvedeva, M. A.

    2017-11-01

    This article is devoted to the study of a supply chain disturbance impact on manufacturing volumes in a production system network. Each network agent's product can be used as a resource by other system agents (manufacturers). A supply chain disturbance can lead to operating cease of the entire network. Authors suggest using of short-term partial resources reservation to mitigate negative consequences of such disturbances. An agent-based model with a reservation algorithm compatible with strategies for resource procurement in terms of financial constraints was engineered. This model works in accordance with the static input-output Leontief 's model. The results can be used for choosing the ways of system's stability improving, and protecting it from various disturbances and imbalance.

  20. Examining global electricity supply vulnerability to climate change using a high-fidelity hydropower dam model.

    Science.gov (United States)

    Turner, Sean W D; Ng, Jia Yi; Galelli, Stefano

    2017-07-15

    An important and plausible impact of a changing global climate is altered power generation from hydroelectric dams. Here we project 21st century global hydropower production by forcing a coupled, global hydrological and dam model with three General Circulation Model (GCM) projections run under two emissions scenarios. Dams are simulated using a detailed model that accounts for plant specifications, storage dynamics, reservoir bathymetry and realistic, optimized operations. We show that the inclusion of these features can have a non-trivial effect on the simulated response of hydropower production to changes in climate. Simulation results highlight substantial uncertainty in the direction of change in globally aggregated hydropower production (~-5 to +5% change in mean global production by the 2080s under a high emissions scenario, depending on GCM). Several clearly impacted hotspots are identified, the most prominent of which encompasses the Mediterranean countries in southern Europe, northern Africa and the Middle East. In this region, hydropower production is projected to be reduced by approximately 40% on average by the end of the century under a high emissions scenario. After accounting for each country's dependence on hydropower for meeting its current electricity demands, the Balkans countries emerge as the most vulnerable (~5-20% loss in total national electricity generation depending on country). On the flipside, a handful of countries in Scandinavia and central Asia are projected to reap a significant increase in total electrical production (~5-15%) without investing in new power generation facilities. Copyright © 2017 Elsevier B.V. All rights reserved.

  1. Short-term global warming mitigation costs of fischer-tropsch diesel production and policy scenarios in Norway

    Energy Technology Data Exchange (ETDEWEB)

    Bright, Ryan M.; Stroemman, Anders Hammer

    2010-07-01

    Full text: Increasing the supply of advanced biofuels like synthetic diesel produced from woody biomass require attractive investment environments so that novel technologies are deployed and technological learning can lead to reduced production costs and accelerated market diffusion. Technology-specific biofuel policy designed to minimize perceived risk may encourage shortterm investment into those biofuels offering superior environmental benefits - particularly climate mitigation benefits - thereby leading to steeper learning curves and deeper greenhouse gas (GHG) emission cuts over the medium- and long-term horizon. We perform both a Life Cycle Assessment (LCA) and an economic analysis of Fischer-Tropsch diesel (FTD) produced from Norwegian forest biomass at an 'nth' commercial plant (a plant with the same technologies that have been employed in previous commercial plants). This is followed with a cost growth analysis in order to derive production costs likely to be borne by pioneer commercial plants in Norway in the short-term (2016). LCA results are used to calculate shortterm GHG mitigation costs. We then assess, through scenarios, how various policy measures and financial support mechanisms would reduce production costs for incentivizing short-term investment and expediting commercial deployment in Norway. Because 'top-down' or 'market pull' biofuel support policy like excise tax exemptions or carbon taxes do not directly encourage investment into specific biofuel technologies like wood-FTD in the short term, we choose to analyze three 'bottom-up' or 'market push' policy scenarios to assess their effects on reducing levelized unit production costs. These include a Capital Grant, a low-interest Loan Guarantee, a Corporate Tax Credit, and a Feedstock Credit scenario. Under the Capital Grant scenario, we assess the change in levelized production and thus GHG abatement costs when a 50% capital grant (TCI) is

  2. 75 FR 65012 - Small Hydropower Development in the United States; Notice of Small/Low-Impact Hydropower Webinar

    Science.gov (United States)

    2010-10-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD09-9-000] Small Hydropower Development in the United States; Notice of Small/Low-Impact Hydropower Webinar October 13, 2010. The Federal Energy Regulatory Commission will host a Small/Low- Impact Hydropower Webinar on November 10, 2010, from...

  3. Asynchrony of wind and hydropower resources in Australia

    KAUST Repository

    Gunturu, Udaya

    2017-08-14

    Wind and hydropower together constitute nearly 80% of the renewable capacity in Australia and their resources are collocated. We show that wind and hydro generation capacity factors covary negatively at the interannual time scales. Thus, the technology diversity mitigates the variability of renewable power generation at the interannual scales. The asynchrony of wind and hydropower resources is explained by the differential impact of the two modes of the El Ni˜no Southern Oscillation – canonical and Modoki – on the wind and hydro resources. Also, the Modoki El Ni˜no and the Modoki La Ni˜na phases have greater impact. The seasonal impact patterns corroborate these results. As the proportion of wind power increases in Australia’s energy mix, this negative covariation has implications for storage capacity of excess wind generation at short time scales and for generation system adequacy at the longer time scales.

  4. Asynchrony of wind and hydropower resources in Australia

    KAUST Repository

    Gunturu, Udaya; Hallgren, Willow

    2017-01-01

    Wind and hydropower together constitute nearly 80% of the renewable capacity in Australia and their resources are collocated. We show that wind and hydro generation capacity factors covary negatively at the interannual time scales. Thus, the technology diversity mitigates the variability of renewable power generation at the interannual scales. The asynchrony of wind and hydropower resources is explained by the differential impact of the two modes of the El Ni˜no Southern Oscillation – canonical and Modoki – on the wind and hydro resources. Also, the Modoki El Ni˜no and the Modoki La Ni˜na phases have greater impact. The seasonal impact patterns corroborate these results. As the proportion of wind power increases in Australia’s energy mix, this negative covariation has implications for storage capacity of excess wind generation at short time scales and for generation system adequacy at the longer time scales.

  5. Asynchrony of wind and hydropower resources in Australia.

    Science.gov (United States)

    Gunturu, Udaya Bhaskar; Hallgren, Willow

    2017-08-18

    Wind and hydropower together constitute nearly 80% of the renewable capacity in Australia and their resources are collocated. We show that wind and hydro generation capacity factors covary negatively at the interannual time scales. Thus, the technology diversity mitigates the variability of renewable power generation at the interannual scales. The asynchrony of wind and hydropower resources is explained by the differential impact of the two modes of the El Ni˜no Southern Oscillation - canonical and Modoki - on the wind and hydro resources. Also, the Modoki El Ni˜no and the Modoki La Ni˜na phases have greater impact. The seasonal impact patterns corroborate these results. As the proportion of wind power increases in Australia's energy mix, this negative covariation has implications for storage capacity of excess wind generation at short time scales and for generation system adequacy at the longer time scales.

  6. Hydropower - internalized costs and externalized benefits

    International Nuclear Information System (INIS)

    Koch, F.H.

    2002-01-01

    The benefits of hydropower consist of the minimal level of noxious and greenhouse gas emissions, it's energy security from political instability, and its renewable, non-depletable nature. The costs of hydropower consist of negative effects on the river ecosystem and of social changes in communities in the vicinity of large projects. Public awareness of these costs has increased dramatically during the past two decades, and new hydro projects will not get approval unless adequate mitigation measures are taken to avoid, offset, or compensate for adverse environmental and social effects. To a very large extent, the hydropower industry has internalized what were previously social and environmental externalities. However, hydropower operators do not receive any compensation for the benefits, and to date their competitors (coal, natural gas, oil) have not been required to internalize their adverse environmental externalities. (emissions, depletion of supplies, and sometimes dependence on imported primary energy sources). This creates an uneven playing field, and the hydropower industry enthusiastically welcomes a discussion of this issue, and eventually measures to rectify the situation. The IEA Hydropower Agreement has completed a major international study on the environmental and social impacts of hydropower, and one major component of this study was a Life Cycle Assessment and comparison of all the most important electricity generation technologies. (author)

  7. Operational constraints and hydrologic variability limit hydropower in supporting wind integration

    International Nuclear Information System (INIS)

    Fernandez, Alisha R; Blumsack, Seth A; Reed, Patrick M

    2013-01-01

    Climate change mitigation will require rapid adoption of low-carbon energy resources. The integration of large-scale wind energy in the United States (US) will require controllable assets to balance the variability of wind energy production. Previous work has identified hydropower as an advantageous asset, due to its flexibility and low-carbon emissions production. While many dams currently provide energy and environmental services in the US and globally, we find that multi-use hydropower facilities would face significant policy conflicts if asked to store and release water to accommodate wind integration. Specifically, we develop a model simulating hydroelectric operational decisions when the electric facility is able to provide wind integration services through a mechanism that we term ‘flex reserves’. We use Kerr Dam in North Carolina as a case study, simulating operations under two alternative reservoir policies, one reflecting current policies and the other regulating flow levels to promote downstream ecosystem conservation. Even under perfect information and significant pricing incentives, Kerr Dam faces operational conflicts when providing any substantial levels of flex reserves while also maintaining releases consistent with other river management requirements. These operational conflicts are severely exacerbated during periods of drought. Increase of payments for flex reserves does not resolve these operational and policy conflicts. (letter)

  8. Hydropower research and development

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This report is a compilation of information on hydropower research and development (R and D) activities of the Federal government and hydropower industry. The report includes descriptions of on-going and planned R and D activities, 1996 funding, and anticipated future funding. Summary information on R and D projects and funding is classified into eight categories: fish passage, behavior, and response; turbine-related; monitoring tool development; hydrology; water quality; dam safety; operations and maintenance; and water resources management. Several issues in hydropower R and D are briefly discussed: duplication; priorities; coordination; technical/peer review; and technology transfer/commercialization. Project information sheets from contributors are included as an appendix.

  9. Hydropower Resource Assessment of Brazilian Streams

    Energy Technology Data Exchange (ETDEWEB)

    Douglas G. Hall

    2011-09-01

    The Idaho National Laboratory (INL) in collaboration with the U.S. Geological Survey (USGS) with the assistance of the Empresa de Pesquisa Energetica (EPE) and the Agencia Nacional de Energia Electrica (ANEEL) has performed a comprehensive assessment of the hydropower potential of all Brazilian natural streams. The methodology by which the assessment was performed is described. The results of the assessment are presented including an estimate of the hydropower potential for all of Brazil, and the spatial distribution of hydropower potential thus providing results on a state by state basis. The assessment results have been incorporated into a geographic information system (GIS) application for the Internet called the Virtual Hydropower Prospector do Brasil. VHP do Brasil displays potential hydropower sites on a map of Brazil in the context of topography and hydrography, existing power and transportation infrastructure, populated places and political boundaries, and land use. The features of the application, which includes tools for finding and selecting potential hydropower sites and other features and displaying their attributes, is fully described.

  10. The role of energy systems on hydropower in Turkey

    Science.gov (United States)

    Yuksel, Ibrahim; Arman, Hasan; Halil Demirel, Ibrahim

    2017-11-01

    Over the last two decades, global electricity production has more than doubled and electricity demand is rising rapidly around the world as economic development spreads to emerging economies. Not only has electricity demand increased significantly, it is the fastest growing end-use of energy. Therefore, technical, economic and environmental benefits of hydroelectric power make it an important contributor to the future world energy mix, particularly in the developing countries. On the other hand, the hydropower industry is closely linked to both water management and renewable energy production, and so has a unique role to play in contributing to sustainable development in a world where billions of people lack access to safe drinking water and adequate energy supplies. In addition to, approximately 1.6 billion people have no access to electricity and about 1.1 billion are without adequate water supply. However, resources for hydropower development are widely spread around the world. Potential exists in about 150 countries, and about 70% of the economically feasible potential remains to be developed-mostly in developing countries where the needs are most urgent. This paper deals with renewable energy systems and the role of hydropower in Turkey.

  11. 76 FR 81929 - Small Hydropower Development in the United States; Notice of Small/Low-Impact Hydropower Webinar

    Science.gov (United States)

    2011-12-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD09-9-000] Small Hydropower Development in the United States; Notice of Small/Low-Impact Hydropower Webinar The Federal Energy Regulatory Commission will host a Small/Low- Impact Hydropower Webinar on January 25, 2012, from 12:00 noon to 1:30 p.m...

  12. 76 FR 30937 - Small Hydropower Development in the United States; Notice of Small/Low-Impact Hydropower Webinar

    Science.gov (United States)

    2011-05-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD09-9-000] Small Hydropower Development in the United States; Notice of Small/Low-Impact Hydropower Webinar The Federal Energy Regulatory Commission (FERC) will host a Small/ Low-Impact Hydropower Webinar on June 22, 2011, from 12 noon to 1 p.m...

  13. Optimization of cascade hydropower system operation by genetic algorithm to maximize clean energy output

    Directory of Open Access Journals (Sweden)

    Aida Tayebiyan

    2016-06-01

    Full Text Available Background: Several reservoir systems have been constructed for hydropower generation around the world. Hydropower offers an economical source of electricity with reduce carbon emissions. Therefore, it is such a clean and renewable source of energy. Reservoirs that generate hydropower are typically operated with the goal of maximizing energy revenue. Yet, reservoir systems are inefficiently operated and manage according to policies determined at the construction time. It is worth noting that with little enhancement in operation of reservoir system, there could be an increase in efficiency of the scheme for many consumers. Methods: This research develops simulation-optimization models that reflect discrete hedging policy (DHP to manage and operate hydropower reservoir system and analyse it in both single and multireservoir system. Accordingly, three operational models (2 single reservoir systems and 1 multi-reservoir system were constructed and optimized by genetic algorithm (GA. Maximizing the total power generation in horizontal time is chosen as an objective function in order to improve the functional efficiency in hydropower production with consideration to operational and physical limitations. The constructed models, which is a cascade hydropower reservoirs system have been tested and evaluated in the Cameron Highland and Batang Padang in Malaysia. Results: According to the given results, usage of DHP for hydropower reservoir system operation could increase the power generation output to nearly 13% in the studied reservoir system compared to present operating policy (TNB operation. This substantial increase in power production will enhance economic development. Moreover, the given results of single and multi-reservoir systems affirmed that hedging policy could manage the single system much better than operation of the multi-reservoir system. Conclusion: It can be summarized that DHP is an efficient and feasible policy, which could be used

  14. Climate impacts on hydropower and consequences for global electricity supply investment needs

    Energy Technology Data Exchange (ETDEWEB)

    Turner, Sean W. D.; Hejazi, Mohamad; Kim, Son H.; Clarke, Leon; Edmonds, Jae

    2017-12-01

    Recent progress in global scale hydrological and dam modeling has allowed for the study of climate change impacts on global hydropower production. Here we explore the possible consequences of these impacts for the electricity supply sector. Regional hydropower projections are developed for two emissions scenarios by forcing a coupled global hydrological and dam model with downscaled, bias-corrected climate realizations derived from sixteen general circulation models. Consequent impacts on power sector composition and associated emissions and investment costs are explored using the Global Change Assessment Model (GCAM). Changes in hydropower generation resulting from climate change can shift power demands onto and away from carbon intensive technologies, resulting in significant impacts on power sector CO2 emissions for certain world regions—primarily those located in Latin America, as well as Canada and parts of Europe. Reduced impacts of climate change on hydropower production under a low emissions scenario coincide with increased costs of marginal power generating capacity—meaning impacts on power sector investment costs are similar for high and low emissions scenarios. Individual countries where impacts on investment costs imply significant risks or opportunities are identified.

  15. Short-term versus long-term market opportunities and financial constraints

    International Nuclear Information System (INIS)

    Ferrari, Angelo

    1999-01-01

    This presentation discusses gas developments in Europe, the European Gas Directive, short term vs. long term, and Snam's new challenges. The European gas market is characterized by (1) The role of gas in meeting the demand for energy, which varies greatly from one country to another, (2) A growing market, (3) Decreasing role of domestic production, and (4) Increasing imports. Within the European Union, the Gas Directive aims to transform single national markets into one integrated European market by introducing third party access to the network for eligible clients as a means of increasing the competition between operators. The Gas Directive would appear to modify the form of the market rather than its size, and in particular the sharing of responsibility and risk among operators. The market in the future will offer operators the possibility to exploit opportunities deriving mainly from demands for increased flexibility. Opportunities linked to entrepreneurial initiatives require long-term investments characteristic of the gas business. Risks and opportunities must be balanced evenly between different operators. If everyone takes on their own risks and responsibilities, this means a wider distribution of the risks of long-term vs. short-term, currently borne by the gas companies that are integrated, into a market that tends to favour the short-term. A gradual liberalization process should allow incumbent operators to gradually diversify their activities in new gas market areas or enter new business activities. They could move beyond their local and European boundaries in pursuit of an international dimension. The market will have to make the transition from the national to the European dimension: as an example, Snam covers 90% of the Italian market, but its share of an integrated European market will be about 15%

  16. Environmental certification for small hydropower plants; Umweltzertifizierung Kleinwasserkraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Truffer, B.; Meier, W.; Vollenweider, S. [Eidgenoessische Anstalt fuer Wasserversorgung, Abwasserreinigung und Gewaesserschutz (EAWAG), Kastanienbaum (Switzerland); Seiler, B.; Dettli, R. [Econcept AG, Zuerich (Switzerland)

    2001-07-01

    This report for the Swiss Federal Institute for Environmental Science and Technology describes product-differentiation options for small hydropower plant in Switzerland and proposes a form of differentiation based on ecological characteristics as a promising market strategy. The labels created in various countries to assure customers of the environmental compatibility of 'green' power production are looked at. In particular, the implications for small hydropower plant associated with the Swiss green power labelling procedure introduced by the Association for the Promotion of Environmentally Sound Electricity (VUE) are discussed. The report proposes a simplified procedure for these small power stations and presents a sample calculation for the overall costs of certification. The report is rounded off with four detailed case studies in which the necessary upgrades to the plant and associated costs are discussed in detail.

  17. Hydropower and Environmental Sustainability - HydroES 2016 Report on the Conference held by SHF in Grenoble on March 16-17, 2016

    International Nuclear Information System (INIS)

    Barillier, Agnes; Caignaert, Guy; Gouraud, Veronique; Ramos, Maria-Helena; Roult, Didier; Viollet, Pierre-Louis

    2016-01-01

    Hydropower is an important source of renewable energy for electrical production in Europe and throughout the world. Being flexible and allowing energy storage, it also facilitates the development of intermittent energy in electricity systems. The development, operation and maintenance of hydropower production are closely related to growing concerns on environment sustainability, climate change mitigation and meeting societal needs for energy. Reliable and efficient hydropower facilities can improve hydropower performance and the environmental acceptability of new projects when they are also planned to protect the environment in which they operate. This document presents a synthesis report of the international conference HydroES 2016 - Hydropower and Environmental Sustainability, organized by SHF and hosted by INP ENSE3, in Grenoble, on 16-17 March 2016. It shows that the scientific community and the hydropower industry are committed to assessing environment and social impacts of hydropower and are proactive towards a sustainable future. (authors)

  18. Hydropower developments in Canada: greenhouse gas emissions, energy outputs and review of environmental impacts

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Peter G.; Cheng, Ryan; Scheelar, Catherine [Global Forest Watch Canada (Canada)

    2011-11-15

    Hydropower is an important source of energy for Canada, accounting for 60% of the electricity generation mix. It is therefore important to understand the environmental performance of such developments in terms of greenhouse gas emissions and environmental impacts. From study of the Eastmain-1 reservoir, it has been extrapolated that hydropower facilities emit between 20 and 36 kilograms of CO2 per megawatt-hour. Hydropower facilities emissions are thus significantly lower than those of fossil fuel facilities, which can emit up to 1,000 kg of CO2 per MW/h. However, hydro projects have several other environmental impacts, such as habitat degradation, bio-accumulation of methyl mercury, and important sediment flow changes. The 271 large hydropower facilities affect 130,000 km of rivers and tens of thousands square kilometres of adjacent habitat. This study pointed out that despite being a low emitter of carbon dioxide, the hydropower sector has significant environmental impacts which require further assessment.

  19. Wind-Driven Ecological Flow Regimes Downstream from Hydropower Dams

    Science.gov (United States)

    Kern, J.; Characklis, G. W.

    2012-12-01

    Conventional hydropower can be turned on and off quicker and less expensively than thermal generation (coal, nuclear, or natural gas). These advantages enable hydropower utilities to respond to rapid fluctuations in energy supply and demand. More recently, a growing renewable energy sector has underlined the need for flexible generation capacity that can complement intermittent renewable resources such as wind power. While wind power entails lower variable costs than other types of generation, incorporating it into electric power systems can be problematic. Due to variable and unpredictable wind speeds, wind power is difficult to schedule and must be used when available. As a result, integrating large amounts of wind power into the grid may result in atypical, swiftly changing demand patterns for other forms of generation, placing a premium on sources that can be rapidly ramped up and down. Moreover, uncertainty in wind power forecasts will stipulate increased levels of 'reserve' generation capacity that can respond quickly if real-time wind supply is less than expected. These changes could create new hourly price dynamics for energy and reserves, altering the short-term financial signals that hydroelectric dam operators use to schedule water releases. Traditionally, hourly stream flow patterns below hydropower dams have corresponded in a very predictable manner to electricity demand, whose primary factors are weather (hourly temperature) and economic activity (workday hours). Wind power integration has the potential to yield more variable, less predictable flows at hydro dams, flows that at times could resemble reciprocal wind patterns. An existing body of research explores the impacts of standard, demand-following hydroelectric dams on downstream ecological flows; but weighing the benefits of increased reliance on wind power against further impacts to ecological flows may be a novel challenge for the environmental community. As a preliminary step in meeting this

  20. The influence of climate change on Tanzania's hydropower sustainability

    Science.gov (United States)

    Sperna Weiland, Frederiek; Boehlert, Brent; Meijer, Karen; Schellekens, Jaap; Magnell, Jan-Petter; Helbrink, Jakob; Kassana, Leonard; Liden, Rikard

    2015-04-01

    average potential of future hydropower production; it will likely make hydropower more profitable. Yet, the uncertainty in climate change projections remains large and risks are significant, adaptation strategies should ideally consider a worst case scenario to ensure robust power generation. Overall a diversified power generation portfolio, anchored in hydropower and supported by other renewables and fossil fuel-based energy sources, is the best solution for Tanzania

  1. Hydropower and its development

    Directory of Open Access Journals (Sweden)

    Janusz Steller

    2013-09-01

    Full Text Available Even if the documented history of hydropower reaches back as far as 5000 years ago, it owes its rapid acceleration in growth to the industrial revolution at the beginning of the nineteenth century. The end of the twentieth century brought about new challenges associated, on the one hand, with a growing demand for ancillary grid services, and on the other with new requirements for mitigating the environmental impact. Hydropower technology expansion had come about in a manner aiming to at least partially exploit the mechanical energy of sea and ocean waters. This study points out to the most important trends in and barriers to hydropower development, with particular focus on the situation in Poland. This author sees the main threats to Polish hydropower development in how it is perceived solely through the prism of the generation of a particular volume of green energy, and a total underestimation of the quality of electricity supply and the numerous non-energy benefits resulting from hydroelectric power plant operation.

  2. Small hydropower station in Lavin - Preliminary study

    International Nuclear Information System (INIS)

    Merz, F.

    2008-05-01

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) presents the results of a preliminary study regarding a proposed small hydropower installation on the alpine river Lavinuoz in Lavin, Switzerland. The geographical situation with mountains and glaciers in the catchment area of the proposed hydropower installation is discussed as are the appropriate water catchment installations. Possible dangers caused by avalanches and rock fall are examined. The power to be produced - 5,500,000 kWh/y - by the turbine which is nominally rated at 1350 kW is discussed, as are estimates of production costs. Figures on the investments required and the economic feasibility of the project are discussed, as are environmental factors that are to be taken into account.

  3. Present situation and future prospect of hydropower in China

    Energy Technology Data Exchange (ETDEWEB)

    Huang, Hailun; Yan, Zheng [Department of Electrical Engineering, Shanghai Jiaotong University, Shanghai 200240 (China)

    2009-08-15

    Hydropower is a clean and renewable energy source. Considering the economic, technical and environmental benefits of hydropower, most countries give priority to its development. China has the richest hydro resources on the planet with a total theoretical hydropower potential of 694 GW. Developing hydropower is of great importance to alleviate the energy crisis and environmental pollution resulting from the rapid economic growth of China in the 21st century. This paper provides a survey of hydropower development in China. Over the last five decades, China's hydropower has developed quickly. The installed capacity of hydropower is 145.26 GW presently. Some large hydropower plants have been in operation and many are still under construction, including the Three Gorges Project (TGP) and pumped-storage power stations. Small hydropower development accelerates rural electrification of this country. (author)

  4. Hydrogen production at hydro-power plants

    Science.gov (United States)

    Tarnay, D. S.

    A tentative design for hydrogen-producing installations at hydropower facilities is discussed from technological, economic and applications viewpoints. The plants would use alternating current to electrolyze purified river water. The hydrogen would be stored in gas or liquid form and oxygen would be sold or vented to the atmosphere. The hydrogen could later be burned in a turbine generator for meeting peak loads, either in closed or open cycle systems. The concept would allow large hydroelectric plants to function in both base- and peak-load modes, thus increasing the hydraulic utilization of the plant and the capacity factor to a projected 0.90. Electrolyzer efficiencies ranging from 0.85-0.90 have been demonstrated. Excess hydrogen can be sold for other purposes or, eventually, as domestic and industrial fuel, at prices competitive with current industrial hydrogen.

  5. Hydropower and local community : A case study of the Kamchay dam, a China-funded hydropower project in Cambodia

    NARCIS (Netherlands)

    Pheakdey, Heng

    2017-01-01

    To solve its chronic power shortage, the Government of Cambodia has placed the development of hydropower as one of the national priorities. With a total of US$2.4bn in investment, China is the most prominent player in hydropower development in Cambodia. The increase of hydropower projects and

  6. Hydropower development in India

    Energy Technology Data Exchange (ETDEWEB)

    Saxena, Praveen [Govt. of India, New Delhi (India). Ministry of New and Renewable Energy], E-mail: psaxena_98@yahoo.com; Kumar, Arun [Indian Institute of Technology Roorkee, Uttarakhand (India). Alternate Hydro Energy Centre], E-mail: aheciitr@gmail.com

    2011-04-15

    India is posed for large deployment of hydropower in present conducive policy and investment environment. Growing energy demand and concern for carbon emission is making hydropower development more favorable. The Government of India is ensuring a good performance of the new SHP stations by linking the incentives to the SHP developers with the performance of the station. (author)

  7. China's rising hydropower demand challenges water sector

    NARCIS (Netherlands)

    Liu, Junguo; Zhao, Dandan; Gerbens-Leenes, Winnie; Guan, Dabo

    2015-01-01

    Demand for hydropower is increasing, yet the water footprints (WFs) of reservoirs and hydropower, and their contributions to water scarcity, are poorly understood. Here, we calculate reservoir WFs (freshwater that evaporates from reservoirs) and hydropower WFs (the WF of hydroelectricity) in China

  8. Greaseless Bushings for Hydropower Applications: Program, Testing, and Results

    National Research Council Canada - National Science Library

    Jones, John

    1999-01-01

    ...) bushings at its hydropower and navigation facilities. Products of this type currently on the market, however, were not specifically developed for the high-load, low-speed oscillating operating conditions typical for power-generation machinery...

  9. The blue water footprint of electricity from hydropower

    Directory of Open Access Journals (Sweden)

    M. M. Mekonnen

    2012-01-01

    Full Text Available Hydropower accounts for about 16% of the world's electricity supply. It has been debated whether hydroelectric generation is merely an in-stream water user or whether it also consumes water. In this paper we provide scientific support for the argument that hydroelectric generation is in most cases a significant water consumer. The study assesses the blue water footprint of hydroelectricity – the water evaporated from manmade reservoirs to produce electric energy – for 35 selected sites. The aggregated blue water footprint of the selected hydropower plants is 90 Gm3 yr−1, which is equivalent to 10% of the blue water footprint of global crop production in the year 2000. The total blue water footprint of hydroelectric generation in the world must be considerably larger if one considers the fact that this study covers only 8% of the global installed hydroelectric capacity. Hydroelectric generation is thus a significant water consumer. The average water footprint of the selected hydropower plants is 68 m3 GJ−1. Great differences in water footprint among hydropower plants exist, due to differences in climate in the places where the plants are situated, but more importantly as a result of large differences in the area flooded per unit of installed hydroelectric capacity. We recommend that water footprint assessment is added as a component in evaluations of newly proposed hydropower plants as well as in the evaluation of existing hydroelectric dams, so that the consequences of the water footprint of hydroelectric generation on downstream environmental flows and other water users can be evaluated.

  10. Rapid effects of estrogens on short-term memory: Possible mechanisms.

    Science.gov (United States)

    Paletta, Pietro; Sheppard, Paul A S; Matta, Richard; Ervin, Kelsy S J; Choleris, Elena

    2018-06-01

    Estrogens affect learning and memory through rapid and delayed mechanisms. Here we review studies on rapid effects on short-term memory. Estradiol rapidly improves social and object recognition memory, spatial memory, and social learning when administered systemically. The dorsal hippocampus mediates estrogen rapid facilitation of object, social and spatial short-term memory. The medial amygdala mediates rapid facilitation of social recognition. The three estrogen receptors, α (ERα), β (ERβ) and the G-protein coupled estrogen receptor (GPER) appear to play different roles depending on the task and brain region. Both ERα and GPER agonists rapidly facilitate short-term social and object recognition and spatial memory when administered systemically or into the dorsal hippocampus and facilitate social recognition in the medial amygdala. Conversely, only GPER can facilitate social learning after systemic treatment and an ERβ agonist only rapidly improved short-term spatial memory when given systemically or into the hippocampus, but also facilitates social recognition in the medial amygdala. Investigations into the mechanisms behind estrogens' rapid effects on short term memory showed an involvement of the extracellular signal-regulated kinase (ERK) and the phosphoinositide 3-kinase (PI3K) kinase pathways. Recent evidence also showed that estrogens interact with the neuropeptide oxytocin in rapidly facilitating social recognition. Estrogens can increase the production and/or release of oxytocin and other neurotransmitters, such as dopamine and acetylcholine. Therefore, it is possible that estrogens' rapid effects on short-term memory may occur through the regulation of various neurotransmitters, although more research is need on these interactions as well as the mechanisms of estrogens' actions on short-term memory. Copyright © 2018 Elsevier Inc. All rights reserved.

  11. Land Systems Impacts of Hydropower Development

    Science.gov (United States)

    Wu, G. C.; Torn, M. S.

    2016-12-01

    Hydropower is often seen as the low-cost, low-carbon, and high-return technology for meeting rising electricity demand and fueling economic growth. Despite the magnitude and pace of hydropower expansion in many developing countries, the potential land use and land cover change (LULCC), particularly indirect LULCC, resulting from hydropower development is poorly understood. Hydropower-driven LULCC can have multiple impacts ranging from global and local climate modification (e.g., increased extreme precipitation events or increased greenhouse gas emissions), ecosystem degradation and fragmentation, to feedbacks on hydropower generation (e.g., increased sedimentation of the reservoir). As a result, a better understanding of both direct and indirect LULCC impacts can inform a more integrated and low-impact model for energy planning in countries with transitioning or growing energy portfolios. This study uses multi-scale remote sensing imagery (Landsat, MODIS, fine-resolution commercial imagery) to estimate LULCC from past hydropower projects intended primarily for electricity generation in 12 countries in Africa, South and Central America, South Asia, and Southeast Asia. It is important to examine multiple locations to determine how socio-political and environmental context determines the magnitude of LULCC. Previous studies have called for the need to scale-up local case studies to examine "cumulative impacts" of multiple development activities within a watershed. We use a pre-test/post-test quasi-experimental design using a time series of classified images and vegetation indices before and after hydropower plant construction as the response variable in an interrupted time series regression analysis. This statistical technique measures the "treatment" effect of hydropower development on indirect LULCC. Preliminary results show land use change and landscape fragmentation following hydropower development, primarily agricultural and urban in nature. These results suggest

  12. Hydropower: Setting a Course for Our Energy Future

    Energy Technology Data Exchange (ETDEWEB)

    2004-07-01

    Hydropower is an annual publication that provides an overview of the Department of Energy's Hydropower Program. The mission of the program is to conduct research and development that will increase the technical, societal, and environmental benefits of hydropower and provide cost-competitive technologies that enable the development of new and incremental hydropower capacity.

  13. What are the differences between long-term, short-term, and working memory?

    Science.gov (United States)

    Cowan, Nelson

    2008-01-01

    In the recent literature there has been considerable confusion about the three types of memory: long-term, short-term, and working memory. This chapter strives to reduce that confusion and makes up-to-date assessments of these types of memory. Long- and short-term memory could differ in two fundamental ways, with only short-term memory demonstrating (1) temporal decay and (2) chunk capacity limits. Both properties of short-term memory are still controversial but the current literature is rather encouraging regarding the existence of both decay and capacity limits. Working memory has been conceived and defined in three different, slightly discrepant ways: as short-term memory applied to cognitive tasks, as a multi-component system that holds and manipulates information in short-term memory, and as the use of attention to manage short-term memory. Regardless of the definition, there are some measures of memory in the short term that seem routine and do not correlate well with cognitive aptitudes and other measures (those usually identified with the term "working memory") that seem more attention demanding and do correlate well with these aptitudes. The evidence is evaluated and placed within a theoretical framework depicted in Fig. 1.

  14. Dataset for case studies of hydropower unit commitment

    Directory of Open Access Journals (Sweden)

    Jinwen Wang

    2018-06-01

    Full Text Available This paper presents the data all needed for nine case studies of hydropower unit commitment, which determines the optimal operating zones and generating discharges of units after the quarter-hourly releases and water heads are derived by the operation of cascaded hydropower reservoirs. The power output function and feasible operating zones of units are provided, and optimization solvers are used to acquire the results in detail for the case studies, including the quarter-hourly generating discharges, power generations, as well as operating zones of individual units. Performance indices, including the spillage, energy production, and the low-efficiency generating rate, are summarized for all case studies and can be readily used for comparison between algorithms in future.

  15. Perspectives for hydropower in Switzerland - chances offered by the 'green power' market

    International Nuclear Information System (INIS)

    Spreng, D.; Truffer, B.; Wuestenhagen, R.

    2003-01-01

    This short article discusses the chances offered to operators of hydropower stations by 'green power' markets for the sale of power produced under strict conditions in environment-friendly power generation facilities. The development of these markets is discussed as are the interdependencies between the public's use of green power markets and measures taken by the state to promote the use of renewable forms of energy. The results of market research on customer willingness to purchase environment-friendly electricity are discussed and the important role of hydropower in this business is stressed. The differing interests of various customer segments are discussed and the part played by 'green stocks' and other sustainable investments in the financial market is looked at

  16. U.S. hydropower resource assessment for Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Conner, A.M.; Francfort, J.E.

    1997-10-01

    The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Nevada.

  17. U.S. hydropower resource assessment for Idaho

    Energy Technology Data Exchange (ETDEWEB)

    Conner, A.M.; Francfort, J.E.

    1998-08-01

    The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Idaho.

  18. US hydropower resource assessment for New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    Connor, A.M.; Francfort, J.E.

    1996-03-01

    The Department of Energy is developing an estimate of the undeveloped hydropower potential in this country. The Hydropower Evaluation Software is a computer model that was developed by the Idaho National Engineering Laboratory for this purpose. The software measures the undeveloped hydropower resources available in the United States, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven software program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based on the environmental attributes present, and generate reports based on these suitability factors. This report details the resource assessment results for the State of New Jersey.

  19. World Small Hydropower Development Report

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Heng; Esser, Lara [ICSGP (China); Masera, Diego [UNIDO, Vienna (Austria)

    2013-07-01

    Currently, small hydropower plants with a capacity of 10 MW, exist in 148 countries or territories worldwide. Four other countries have been identified with resource potential. This report aims to identify the development status and resource potential of small hydro in various countries, territories and regions throughout the world. Working with experts at the ground level to compile and share existing information, experiences and challenges, one comprehensive report was created. Decision-makers, stakeholders and potential investors clearly need this comprehensive information to more effectively promote small hydropower as a renewable and rural energy source for sustainable development and to overcome the existing development barriers. The findings of this report show that small hydropower potential globally is approximated at almost 173 GW. The figure is arrived by totaling data from a wide range of sources with potential compromise of data integrity to varying degrees. For example, research data on economically feasible potential were more readily available in developed countries than those in the least developed or developing countries. More than half of the world's known hydropower potential is located in Asia, around one third can be found in Europe and the Americas. It is possible in the future that more small hydropower potential might be identified both on the African and American continents. The installed small hydropower capacity (up to 10 MW) is estimated to be 75 GW in 2011/2012. The report provides detailed data for each country/region, including recommendations on the national, regional and international level.

  20. World Small Hydropower Development Report

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Heng; Esser, Lara (ICSGP (China)); Masera, Diego (UNIDO, Vienna (Austria))

    2013-07-01

    Currently, small hydropower plants with a capacity of 10 MW, exist in 148 countries or territories worldwide. Four other countries have been identified with resource potential. This report aims to identify the development status and resource potential of small hydro in various countries, territories and regions throughout the world. Working with experts at the ground level to compile and share existing information, experiences and challenges, one comprehensive report was created. Decision-makers, stakeholders and potential investors clearly need this comprehensive information to more effectively promote small hydropower as a renewable and rural energy source for sustainable development and to overcome the existing development barriers. The findings of this report show that small hydropower potential globally is approximated at almost 173 GW. The figure is arrived by totaling data from a wide range of sources with potential compromise of data integrity to varying degrees. For example, research data on economically feasible potential were more readily available in developed countries than those in the least developed or developing countries. More than half of the world's known hydropower potential is located in Asia, around one third can be found in Europe and the Americas. It is possible in the future that more small hydropower potential might be identified both on the African and American continents. The installed small hydropower capacity (up to 10 MW) is estimated to be 75 GW in 2011/2012. The report provides detailed data for each country/region, including recommendations on the national, regional and international level.

  1. Forecasting short-term wind farm production in complex terrain. Volume 1

    International Nuclear Information System (INIS)

    LeBlanc, M.

    2005-01-01

    Wind energy forecasting adds financial value to wind farms and may soon become a regulatory requirement. A robust information technology system is essential for addressing industry demands. Various forecasting methodologies for short-term wind production in complex terrain were presented. Numerical weather predictions were discussed with reference to supervisory control and data acquisition (SCADA) system site measurements. Forecasting methods using wind speed, direction, temperature and pressure, as well as issues concerning statistical modelling were presented. Model output statistics and neural networks were reviewed, as well as significant components of error. Results from a Garrad Hassan forecaster with a European wind farm were presented, including wind speed evaluation, and forecast horizon for T + 1 hours, T + 12 hours, and T + 36 hours. It was suggested that buy prices often reflect the cost of under-prediction, and that forecasting has more potential where the spread is greatest. Accurate T + 19 hours to T + 31 hours could enable participation in the day-ahead market, which is less volatile and prices are usually better. Estimates of possible profits per annum through the use of GH forecaster power predictions were presented, calculated over and above spilling power to the grid. It was concluded that accurate forecasts combined with certainty evaluation enables the optimization of wind energy in the market, and is applicable to a wide range of weather regimes and terrain types. It was suggested that site feedback is essential for good forecasts at short horizons, and that the value of forecasting is dependent on the market. refs., tabs., figs

  2. Hydropower development trends from a technological paradigm perspective

    International Nuclear Information System (INIS)

    Xu, Jiuping; Ni, Ting; Zheng, Bobo

    2015-01-01

    Highlights: • We propose a novel concept of hydropower development technological paradigm. • We create a data analysis system to visualize the keyword foci. • Future trajectories include hybrid power systems and resources from seawater. • The HDTP consists of a three-stage evolution and a policy framework. • The HDTP provides a how-to-do solution for the soft path. - Abstract: Hydropower has long been considered the backbone of the power generation sector in low-carbon and sustainable energy systems. Yet, as reliance on hydropower has been generally declining, the world is awakening to the need to fundamentally rethink the way hydropower is developed and managed. The paper proposes a systematic methodology to research the development trends and find a more sustainable hydropower path. Literature mining using the data analysis system and the technological paradigm theory were adopted to conduct the research. The keyword visualization results were found to meet the laws for the three phases of the technological paradigm. Specific key areas, such as small hydropower plants, hybrid power systems, and hydropower from seawater were identified as past, present and near future trajectories. To further accelerate hydropower development, specific subsidies and incentives need to be provided in areas such as capital costs and technological support. The study paves the way for a soft path solution which complements the hard path in hydropower field

  3. Impact of glacier shrinkage and adapted hydropower potential in the Swiss Alps

    International Nuclear Information System (INIS)

    Terrier, Stephane; Bieri, Martin; Jordan, Frederic; Schleiss, Anton J.

    2015-01-01

    Global warming is an alarming reality and likely leads to an increase of multiple pressures on socio-economic systems. However, in high-mountain regions it might also become an opportunity to adapt existing hydropower schemes and to develop new projects to this reality. In the Alps, the melting of glaciers first produces over the near future an increase of the average annual discharge depending on glacier and catchment characteristics, especially during the summer season. Nevertheless after a certain time, significant decrease of runoff related to glacier melting must be considered for hydropower management. Moreover, the shrinking glaciers free new areas, having the potential for the construction of new dams and reservoirs. The opportunity to build new dams and hydropower plants downstream of retreating glaciers is studied using two models. The first (GlabTop) is used to predict the future topography and geomorphology underneath the melting glaciers, in order to define the optimal locations of the future dams and reservoirs. Secondly, the RS3.0 CLIMATE rainfall-runoff hydrological model computes the glacier evolution, the river discharge at the outlet of the catchment area as well as the hydropower production of the new schemes. As a case study the Upper Aare River basin in Switzerland is presented. The opportunity of the construction of a new dam and a hydropower plant is studied, including its economic benefit. The result of the case study provides a basis to assess the potential of investing in such projects to ensure the Swiss hydroelectricity production also in future as well as peak energy for the European grid. (authors)

  4. China's rising hydropower demand challenges water sector.

    Science.gov (United States)

    Liu, Junguo; Zhao, Dandan; Gerbens-Leenes, P W; Guan, Dabo

    2015-07-09

    Demand for hydropower is increasing, yet the water footprints (WFs) of reservoirs and hydropower, and their contributions to water scarcity, are poorly understood. Here, we calculate reservoir WFs (freshwater that evaporates from reservoirs) and hydropower WFs (the WF of hydroelectricity) in China based on data from 875 representative reservoirs (209 with power plants). In 2010, the reservoir WF totaled 27.9 × 10(9) m(3) (Gm(3)), or 22% of China's total water consumption. Ignoring the reservoir WF seriously underestimates human water appropriation. The reservoir WF associated with industrial, domestic and agricultural WFs caused water scarcity in 6 of the 10 major Chinese river basins from 2 to 12 months annually. The hydropower WF was 6.6 Gm(3) yr(-1) or 3.6 m(3) of water to produce a GJ (10(9) J) of electricity. Hydropower is a water intensive energy carrier. As a response to global climate change, the Chinese government has promoted a further increase in hydropower energy by 70% by 2020 compared to 2012. This energy policy imposes pressure on available freshwater resources and increases water scarcity. The water-energy nexus requires strategic and coordinated implementations of hydropower development among geographical regions, as well as trade-off analysis between rising energy demand and water use sustainability.

  5. Hydropower externalities: a meta analysis

    NARCIS (Netherlands)

    Mattmann, M.; Logar, I.; Brouwer, R.

    2016-01-01

    This paper presents a meta-analysis of existing research related to the economic valuation of the external effects of hydropower. A database consisting of 81 observations derived from 29 studies valuing the non-market impacts of hydropower electricity generation is constructed with the main aim to

  6. Hydropower plans in eastern and southern Africa increase risk of concurrent climate-related electricity supply disruption

    Science.gov (United States)

    Conway, Declan; Dalin, Carole; Landman, Willem A.; Osborn, Timothy J.

    2017-12-01

    Hydropower comprises a significant and rapidly expanding proportion of electricity production in eastern and southern Africa. In both regions, hydropower is exposed to high levels of climate variability and regional climate linkages are strong, yet an understanding of spatial interdependences is lacking. Here we consider river basin configuration and define regions of coherent rainfall variability using cluster analysis to illustrate exposure to the risk of hydropower supply disruption of current (2015) and planned (2030) hydropower sites. Assuming completion of the dams planned, hydropower will become increasingly concentrated in the Nile (from 62% to 82% of total regional capacity) and Zambezi (from 73% to 85%) basins. By 2030, 70% and 59% of total hydropower capacity will be located in one cluster of rainfall variability in eastern and southern Africa, respectively, increasing the risk of concurrent climate-related electricity supply disruption in each region. Linking of nascent regional electricity sharing mechanisms could mitigate intraregional risk, although these mechanisms face considerable political and infrastructural challenges.

  7. The Demonstration of Short-Term Consolidation.

    Science.gov (United States)

    Jolicoeur, Pierre; Dell'Acqua, Roberto

    1998-01-01

    Results of seven experiments involving 112 college students or staff using a dual-task approach provide evidence that encoding information into short-term memory involves a distinct process termed short-term consolidation (STC). Results suggest that STC has limited capacity and that it requires central processing mechanisms. (SLD)

  8. Downstream effects of hydropower production on aquatic macroinvertebrate assemblages in two rivers in Costa Rica.

    Science.gov (United States)

    Chaves-Ulloa, Ramsa; Umaña-Villalobos, Gerardo; Springer, Monika

    2014-04-01

    Despite the fact that little is known about the consequences of hydropower production in tropical areas, many large dams (> 15 m high) are currently under construction or consideration in the tropics. We researched the effects of large hydroelectric dams on aquatic macroinvertebrate assemblages in two Costa Rican rivers. We measured physicochemical characteristics and sampled aquatic macroinvertebrates from March 2003 to March 2004 in two dammed rivers, Peñas Blancas and San Lorenzo, as well as in the undammed Chachagua River. Sites above and below the dam had differences in their physicochemical variables, with wide variation and extreme values in variables measured below the dam in the San Lorenzo River. Sites below the dams had reduced water discharges, velocities, and depths when compared with sites above the dams, as well as higher temperatures and conductivity. Sites above dams were dominated by collector-gatherer-scrapers and habitat groups dominated by swimmer-clingers, while sites below dams had a more even representation of groups. In contrast, a comparison between two sites at different elevation in the undammed river maintained a similar assemblage composition. Tributaries might facilitate macroinvertebrate recovery above the turbine house, but the assemblage below the turbine house resembled the one below the dam. A massive sediment release event from the dam decreased the abundance per sample and macroinvertebrate taxa below the dam in the Peñas Blancas River. Our study illustrates the effects of hydropower production on neotropical rivers, highlighting the importance of using multiple measures of macroinvertebrate assemblage structure for assessing this type of environmental impact.

  9. Short term forecasting of petroleum product demand in France; Modelisation a court terme des consommations de produits petroliers en France

    Energy Technology Data Exchange (ETDEWEB)

    Cadren, M

    1998-06-23

    The analysis of petroleum product demand became a privileged thrust of research following the modifications in terms of structure and level of the petroleum markets since eighties. The greatest importance to econometrics models of Energy demand, joint works about nonstationary data, explained the development of error-correction models and the co-integration. In this context, the short term econometrics modelling of petroleum product demand does not only focus on forecasts but also on the measure of the gain acquired from using error-correction techniques and co-integration. It`s filling to take the influence of technical improvement and environment pressures into account in econometrics modelling of petroleum products demand. The first part presents the evolution of Energy Demand in France and more particularly the petroleum product demand since 1986. The objective is to determine the main characteristics of each product, which will help us to analyse and validate the econometrics models. The second part focus on the recent developments in times series modelling. We study the problem of nonstationary data and expose different unit root tests. We examine the main approaches to univariate and multivariate modelling with nonstationary data and distinguish the forecasts of the latter`s. The third part is intended to applications; its objective is to illustrate the theoretic developments of the second part with a comparison between the performances of different approaches (approach Box and Jenkins, Johansen approach`s and structural approach). The models will be applied to the main French petroleum market. The observed asymmetrical demand behaviour is also considered. (author) 153 refs.

  10. Modelling the short term interest with stochastic differential equation in continuous time: linear versus non-linear mode

    OpenAIRE

    2014-01-01

    M.Com. (Financial Economics) Recently, there has been a growth in the bond market. This growth has brought with it an ever-increasing volume and range of interest rate depended derivative products known as interest rate derivatives. Amongst the variables used in pricing these derivative products is the short-term interest rate. A numbers of short-term interest rate models that are used to fit the short-term interest rate exist. Therefore, understanding the features characterised by various...

  11. Improving the global efficiency in small hydropower practice

    Science.gov (United States)

    Razurel, P.; Gorla, L.; Crouzy, B.; Perona, P.

    2015-12-01

    The global increase in energy production from renewable sources has seen river exploitation for small hydropower plants to also grow considerably in the last decade. River intakes used to divert water from the main course to the power plant are at the base of such practice. A key issue concern with finding innovative concepts to both design and manage such structures in order to improve classic operational rules. Among these, the Minimal Flow Release (MFR) concept has long been used in spite of its environmental inconsistency.In this work, we show that the economical and ecological efficiency of diverting water for energy production in small hydropower plants can be improved towards sustainability by engineering a novel class of flow-redistribution policies. We use the mathematical form of the Fermi-Dirac statistical distribution to define non-proportional dynamic flow-redistribution rules, which broadens the spectrum of dynamic flow releases based on proportional redistribution. The theoretical background as well as the economic interpretation is presented and applied to three case studies in order to systematically test the global performance of such policies. Out of numerical simulations, a Pareto frontier emerges in the economic vs environmental efficiency plot, which show that non-proportional distribution policies improve both efficiencies with respect to those obtained from some traditional MFR and proportional policies. This picture is shown also for long term climatic scenarios affecting water availability and the natural flow regime.In a time of intense and increasing exploitation close to resource saturation, preserving natural river reaches requires to abandon inappropriate static release policies in favor of non-proportional ones towards a sustainable use of the water resource.

  12. What are the differences between long-term, short-term, and working memory?

    OpenAIRE

    Cowan, Nelson

    2008-01-01

    In the recent literature there has been considerable confusion about the three types of memory: long-term, short-term, and working memory. This chapter strives to reduce that confusion and makes up-to-date assessments of these types of memory. Long- and short-term memory could differ in two fundamental ways, with only short-term memory demonstrating (1) temporal decay and (2) chunk capacity limits. Both properties of short-term memory are still controversial but the current literature is rath...

  13. Critical evaluation of the hydropower applications in Greece

    Energy Technology Data Exchange (ETDEWEB)

    Kaldellis, J.K. [Laboratory of Soft Energy Applications and Environmental Protection, TEI Piraeus, P.O. Box 41046, Athens 12201 (Greece)

    2008-01-15

    Hydropower is a proven technology for electricity generation, contributing with almost 20% to the fulfilment of the planet electricity demand. Hydropower is also renewable because it draws its essential energy from the sun and particularly from the hydrological cycle. Greece and more precisely the west and north part of the mainland possesses significant hydropower potential that is up to now partially exploited. In the present survey, one investigates the existing situation concerning the applications of hydropower plants in Greece, while the results obtained are compared with the corresponding international and European situation. Subsequently, emphasis is laid on estimating the electricity-generation utilization degree of the existing large hydropower stations, using 25-year long official data. The results obtained underline the fact that the electricity generation is not a priority for the national water management policy and most Greek hydropower stations are used mainly to meet the corresponding peak load demand. On the other hand, increased interest to create numerous new small hydropower plants throughout Greece has been expressed during the last 5 years. According to the information gathered and analyzed, one may state that the available local hydropower potential is quite promising and can substantially contribute to the accomplishment of the national-EU target to cover the 21% of the corresponding electricity consumption from renewable resources. For this purpose one should first define an approved and rational water resources management plan and secondly support the increased utilization of large and small hydropower plants for electricity generation. In this case, properly designed hydropower plants should lead to considerable profits, contributing also in the country's independency from imported oil and accomplishing the Kyoto protocol obligations. (author)

  14. Evaluation of economic rent of hydropower projects

    International Nuclear Information System (INIS)

    Shrestha, Ram M.; Abeygunawardana, A.M.A.K.

    2009-01-01

    Existing studies have mostly estimated the ex post economic rent of hydropower for the hydroelectric system of a province or a country as a whole and have ignored the site- or project-specific variations in the economic rent of hydropower plants. Further, most of the existing studies have used simplified methods to calculate the rent ex post. This paper presents a rigorous methodology for estimation of site-specific (i.e., project specific) economic rent of hydropower ex ante. It applies the methodology in the case of a hydropower project and analyzes the sensitivity of the rent to variations in some key parameters.

  15. Modeling the Effects of Trait Diversity on Short-term Adaptive Capacity and Long-term Productivity of Phytoplankton Communities

    Science.gov (United States)

    Smith, S. L.; Vallina, S. M.; Merico, A.

    2016-02-01

    We examine Biodiversity and Ecosystem Function (BEF) in a model phytoplankton community, using two recently developed mechanisms for sustaining diversity. The Trait Diffusion (TD) formulation represents the maintenance of diversity via endogenous mechanisms, such as inter-generational trait plasticity and rapid evolution. The 'Kill-the-Winner' (KTW) formulation for grazing sustains prey biodiversity via the exogenous mechanism of active prey switching. We implement both TD and KTW in a continuous trait-distribution model using simplified size-scalings to define a gleaner-opportunist trade-off for a phytoplankton community. By simulating semi-continuous culture experiments with periodic external dilutions, we test the dynamic response of the phytoplankton community to different scenarios of pulsed nutrient supply. We quantify the short-term Adaptive Capacity (AC) of the community by the specific growth rate averaged over the first 3 days of perturbations, and the Long-term Productivity (LP) by its average over the entire 120 day period of perturbations. When either the frequency or intensity of pulses is low, both AC and LP tend to decrease with diversity (and vice versa). Trait diversity has more impact on AC, particularly for pulses of high frequency or intensity, for which it tends to increase gradually at first, then steeply, and then to saturate with increasing diversity. For pulses of moderate intensity and frequency, increasing trait diversity from low to moderate levels leads to a trade-off between enhancing AC while slightly decreasing LP. Ultimately, we find that sustaining diversity increases the speed at which the phytoplankton community changes its composition in terms of size and hence nutrient acquisition traits, which may have implications for the transfer of productivity through the foodweb.

  16. Short-term memory across eye blinks.

    Science.gov (United States)

    Irwin, David E

    2014-01-01

    The effect of eye blinks on short-term memory was examined in two experiments. On each trial, participants viewed an initial display of coloured, oriented lines, then after a retention interval they viewed a test display that was either identical or different by one feature. Participants kept their eyes open throughout the retention interval on some blocks of trials, whereas on others they made a single eye blink. Accuracy was measured as a function of the number of items in the display to determine the capacity of short-term memory on blink and no-blink trials. In separate blocks of trials participants were instructed to remember colour only, orientation only, or both colour and orientation. Eye blinks reduced short-term memory capacity by approximately 0.6-0.8 items for both feature and conjunction stimuli. A third, control, experiment showed that a button press during the retention interval had no effect on short-term memory capacity, indicating that the effect of an eye blink was not due to general motoric dual-task interference. Eye blinks might instead reduce short-term memory capacity by interfering with attention-based rehearsal processes.

  17. Stacking Ensemble Learning for Short-Term Electricity Consumption Forecasting

    Directory of Open Access Journals (Sweden)

    Federico Divina

    2018-04-01

    Full Text Available The ability to predict short-term electric energy demand would provide several benefits, both at the economic and environmental level. For example, it would allow for an efficient use of resources in order to face the actual demand, reducing the costs associated to the production as well as the emission of CO 2 . To this aim, in this paper we propose a strategy based on ensemble learning in order to tackle the short-term load forecasting problem. In particular, our approach is based on a stacking ensemble learning scheme, where the predictions produced by three base learning methods are used by a top level method in order to produce final predictions. We tested the proposed scheme on a dataset reporting the energy consumption in Spain over more than nine years. The obtained experimental results show that an approach for short-term electricity consumption forecasting based on ensemble learning can help in combining predictions produced by weaker learning methods in order to obtain superior results. In particular, the system produces a lower error with respect to the existing state-of-the art techniques used on the same dataset. More importantly, this case study has shown that using an ensemble scheme can achieve very accurate predictions, and thus that it is a suitable approach for addressing the short-term load forecasting problem.

  18. Short-term memory and dual task performance

    Science.gov (United States)

    Regan, J. E.

    1982-01-01

    Two hypotheses concerning the way in which short-term memory interacts with another task in a dual task situation are considered. It is noted that when two tasks are combined, the activity of controlling and organizing performance on both tasks simultaneously may compete with either task for a resource; this resource may be space in a central mechanism or general processing capacity or it may be some task-specific resource. If a special relationship exists between short-term memory and control, especially if there is an identity relationship between short-term and a central controlling mechanism, then short-term memory performance should show a decrement in a dual task situation. Even if short-term memory does not have any particular identity with a controlling mechanism, but both tasks draw on some common resource or resources, then a tradeoff between the two tasks in allocating resources is possible and could be reflected in performance. The persistent concurrence cost in memory performance in these experiments suggests that short-term memory may have a unique status in the information processing system.

  19. Hydropower's role in delivering sustainability

    International Nuclear Information System (INIS)

    Altinbilek, D.; Seelos, K.; Taylor, R.

    2005-01-01

    equipment within existing infrastructure; this can extend the operating life by a further 30 to 50 years. Small-scale, decentralised development has been responsible for bringing light and power to remote communities. Such schemes have catalysed local commercial diversification and prosperity. The lower investment demand of smaller schemes has enabled private sector involvement through independent power production. Typically smaller schemes become grid connected if the power system is accessible, as this increases the security of supply. Furthermore, schemes at remote sites can assist transmission system stability. A further important role of smaller scale hydro is the recovery of energy at water infrastructure developed for other purposes. In many countries, large schemes play a significant role in national and regional supply security due to the flexibility of storage reservoirs and independence from fuel price fluctuations. Hydro also integrates well with other generation technologies, with its flexibility enabling thermal plants to operate steadily (saving fuel and reducing emissions). In addition, its responsiveness permits the back-up of the intermittent renewables. The question of storage is clearly a major issue in balancing supply and demand. Hydro reservoirs and pump-storage schemes offer security in the stability and reliability of power systems; they can absorb power when there is an excess and follow load demand instantaneously. A major challenge is that 'support' and 'storage' services are rarely understood and encouraged in the market-driven arena. The main arguments against hydropower concern its social impacts, such as land transformation, displacement of people, and environmental changes, i.e. fauna, flora, sedimentation and water quality. The social and environmental impacts can, however, be mitigated by taking appropriate steps according to established codes of good practice. As a tool for this purpose, the hydropower sector has recently developed and

  20. Modeling Multi-Reservoir Hydropower Systems in the Sierra Nevada with Environmental Requirements and Climate Warming

    Science.gov (United States)

    Rheinheimer, David Emmanuel

    Hydropower systems and other river regulation often harm instream ecosystems, partly by altering the natural flow and temperature regimes that ecosystems have historically depended on. These effects are compounded at regional scales. As hydropower and ecosystems are increasingly valued globally due to growing values for clean energy and native species as well as and new threats from climate warming, it is important to understand how climate warming might affect these systems, to identify tradeoffs between different water uses for different climate conditions, and to identify promising water management solutions. This research uses traditional simulation and optimization to explore these issues in California's upper west slope Sierra Nevada mountains. The Sierra Nevada provides most of the water for California's vast water supply system, supporting high-elevation hydropower generation, ecosystems, recreation, and some local municipal and agricultural water supply along the way. However, regional climate warming is expected to reduce snowmelt and shift runoff to earlier in the year, affecting all water uses. This dissertation begins by reviewing important literature related to the broader motivations of this study, including river regulation, freshwater conservation, and climate change. It then describes three substantial studies. First, a weekly time step water resources management model spanning the Feather River watershed in the north to the Kern River watershed in the south is developed. The model, which uses the Water Evaluation And Planning System (WEAP), includes reservoirs, run-of-river hydropower, variable head hydropower, water supply demand, and instream flow requirements. The model is applied with a runoff dataset that considers regional air temperature increases of 0, 2, 4 and 6 °C to represent historical, near-term, mid-term and far-term (end-of-century) warming. Most major hydropower turbine flows are simulated well. Reservoir storage is also

  1. Hydropower engineering. Paper no. IGEC-1-005

    International Nuclear Information System (INIS)

    Cervantes, M.

    2005-01-01

    Hydropower, one of the corner stones of sustainable energy development, is the largest renewable source of energy. There is a large demand worldwide for people trained to design, operate, maintain and optimise hydropower systems. Hydro Power University, a name which encompasses both education, research and development within hydropower in Sweden, offers a unique and broad international masters programme within hydropower engineering including civil, mechanical and electrical engineering. The programme is the result of a close collaboration between Lulea University of Technology and Uppsala University, at the research and education level. This master programme, Hydropower Engineering, is open to both Swedish and foreign students free of charge. It aims to provide students with state of the art knowledge and experience on parts of the hydropower system such as turbine technology, generator design, rotor dynamics, tribology, dams/dam safety, maintenance and operation and environmental aspects. World unique laboratory experiments are offered to the students at Porjus and Alvkarleby, Sweden. The Porjus Hydropower Centre offers world unique facilities: two full scale turbines of 10 MW each, one with the latest generator technology - Powerformer. The turbines are exclusively dedicated for use in education, research and development. State of the art in measurement technology is available. Both units are at the centre of each education programme offered by the Hydro Power University. In Alvkarleby, spillways, discharge capacity and turbines model testing can be undertaken at the Vattenfall laboratory also with state of the art experimental material and highly qualified staff. The large number of applications from developing countries indicates a need of scholarships, which needs to be resolved for the development of hydropower. (author)

  2. Requirements and benefits of flow forecasting for improving hydropower generation

    NARCIS (Netherlands)

    Dong, Xiaohua; Vrijling, J.K.; Dohmen-Janssen, Catarine M.; Ruigh, E.; Booij, Martijn J.; Stalenberg, B.; Hulscher, Suzanne J.M.H.; van Gelder, P.H.A.J.M.; Verlaan, M.; Zijderveld, A.; Waarts, P.

    2005-01-01

    This paper presents a methodology to identify the required lead time and accuracy of flow forecasting for improving hydropower generation of a reservoir, by simulating the benefits (in terms of electricity generated) obtained from the forecasting with varying lead times and accuracies. The

  3. Pumped Storage and Potential Hydropower from Conduits

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-02-25

    Th is Congressional Report, Pumped Storage Hydropower and Potential Hydropower from Conduits, addresses the technical flexibility that existing pumped storage facilities can provide to support intermittent renewable energy generation. This study considered potential upgrades or retrofit of these facilities, the technical potential of existing and new pumped storage facilities to provide grid reliability benefits, and the range of conduit hydropower opportunities available in the United States.

  4. Effects of short- and long-term feeding of L-carnitine and congeners on the production of eicosanoids from rat peritoneal leucocytes

    NARCIS (Netherlands)

    I.M. Garrelds (Ingrid); G.R. Elliott (G.); F.J. Zijlstra (Freek); I.L. Bonta

    1994-01-01

    textabstractThe effect of short- and long-term feeding with L-carnitine, L-acetyl carnitine and L-propionyl carnitine on the production of eicosanoids front in vitro stimulated carrageenan-induced rat peritoneal macrophages was investigated. Both young (4 weeks) and old (18 months) rats were used. A

  5. A Holistic Framework for Environmental Flows Determination in Hydropower Contexts

    Energy Technology Data Exchange (ETDEWEB)

    McManamay, Ryan A [ORNL; Bevelhimer, Mark S [ORNL

    2013-05-01

    Among the ecological science community, the consensus view is that the natural flow regime sustains the ecological integrity of river systems. This prevailing viewpoint by many environmental stakeholders has progressively led to increased pressure on hydropower dam owners to change plant operations to affect downstream river flows with the intention of providing better conditions for aquatic biological communities. Identifying the neccessary magnitude, frequency, duration, timing, or rate of change of stream flows to meet ecological needs in a hydropower context is challenging because the ecological responses to changes in flows may not be fully known, there are usually a multitude of competing users of flow, and implementing environmental flows usually comes at a price to energy production. Realistically, hydropower managers must develop a reduced set of goals that provide the most benefit to the identified ecological needs. As a part of the Department of Energy (DOE) Water Power Program, the Instream Flow Project (IFP) was carried out by Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Argon National Laboratory (ANL) as an attempt to develop tools aimed at defining environmental flow needs for hydropower operations. The application of these tools ranges from national to site-specific scales; thus, the utility of each tool will depend on various phases of the environmental flow process. Given the complexity and sheer volume of applications used to determine environmentally acceptable flows for hydropower, a framework is needed to organize efforts into a staged process dependent upon spatial, temporal, and functional attributes. By far, the predominant domain for determining environmental flows related to hydropower is within the Federal Energy Regulatory Commission (FERC) relicensing process. This process can take multiple years and can be very expensive depending on the scale of each hydropower project. The utility of such a

  6. External effects in Swiss hydropower

    International Nuclear Information System (INIS)

    Hauenstein, W.; Bonvin, J.; Vouillamoz, J.

    1999-01-01

    The article discusses the external costs and benefits of hydropower that are not internalised in normal book-keeping. Several negative and positive effects are discussed. The results of a study that addressed the difficult task of quantifying these external effects are presented. An assessment of the results gained shows that difficulties are to be met regarding system limits, methods of expressing the effects in monetary terms and ethical factors. The report also examines the consideration of external effects as a correction factor for falsified market prices for electricity

  7. Temporal Prediction Errors Affect Short-Term Memory Scanning Response Time.

    Science.gov (United States)

    Limongi, Roberto; Silva, Angélica M

    2016-11-01

    The Sternberg short-term memory scanning task has been used to unveil cognitive operations involved in time perception. Participants produce time intervals during the task, and the researcher explores how task performance affects interval production - where time estimation error is the dependent variable of interest. The perspective of predictive behavior regards time estimation error as a temporal prediction error (PE), an independent variable that controls cognition, behavior, and learning. Based on this perspective, we investigated whether temporal PEs affect short-term memory scanning. Participants performed temporal predictions while they maintained information in memory. Model inference revealed that PEs affected memory scanning response time independently of the memory-set size effect. We discuss the results within the context of formal and mechanistic models of short-term memory scanning and predictive coding, a Bayes-based theory of brain function. We state the hypothesis that our finding could be associated with weak frontostriatal connections and weak striatal activity.

  8. Short-term incentive schemes for hospital managers

    Directory of Open Access Journals (Sweden)

    Lucas Malambe

    2013-10-01

    Full Text Available Orientation: Short-term incentives, considered to be an extrinsic motivation, are commonly used to motivate performance. This study explored hospital managers’ perceptions of short term incentives in maximising performance and retention. Research purpose: The study explored the experiences, views and perceptions of private hospital managers in South Africa regarding the use of short-term incentives to maximise performance and retention, as well as the applicability of the findings to public hospitals. Motivation for the study: Whilst there is an established link between performance reward schemes and organisational performance, there is little understanding of the effects of short term incentives on the performance and retention of hospital managers within the South African context. Research design, approach, and method: The study used a qualitative research design: interviews were conducted with a purposive sample of 19 hospital managers, and a thematic content analysis was performed. Main findings: Short-term incentives may not be the primary motivator for hospital managers, but they do play a critical role in sustaining motivation. Participants indicated that these schemes could also be applicable to public hospitals. Practical/managerial implications: Hospital managers are inclined to be more motivated by intrinsic than extrinsic factors. However, hospital managers (as middle managers also seem to be motivated by short-term incentives. A combination of intrinsic and extrinsic motivators should thus be used to maximise performance and retention. Contribution/value-add: Whilst the study sought to explore hospital managers’ perceptions of short-term incentives, it also found that an adequate balance between internal and external motivators is key to implementing an effective short-term incentive scheme.

  9. Short-Term Intercultural Psychotherapy: Ethnographic Inquiry

    Science.gov (United States)

    Seeley, Karen M.

    2004-01-01

    This article examines the challenges specific to short-term intercultural treatments and recently developed approaches to intercultural treatments based on notions of cultural knowledge and cultural competence. The article introduces alternative approaches to short-term intercultural treatments based on ethnographic inquiry adapted for clinical…

  10. Why do short term workers have high mortality?

    DEFF Research Database (Denmark)

    Kolstad, Henrik; Olsen, Jørn

    1999-01-01

    or violence, the rate ratios for short term employment were 2.30 (95% Cl 1.74-3.06) and 1.86 (95% Cl 1.35-2.56), respectively. An unhealthy lifestyle may also be a determinant of short term employment. While it is possible in principle to adjust for lifestyle factors if proper data are collected, the health......Increased mortality is often reported among workers in short term employment. This may indicate either a health-related selection process or the presence of different lifestyle or social conditions among short term workers. The authors studied these two aspects of short term employment among 16...

  11. Risk management of hydropower development in China

    International Nuclear Information System (INIS)

    Tang, Wenzhe; Li, Zhuoyu; Qiang, Maoshan; Wang, Shuli; Lu, Youmei

    2013-01-01

    There is a rapidly increasing demand for hydropower in China. However, little research has been conducted to systematically investigate the overall aspects of hydropower development risks. With support of the data collected from a fieldwork survey, this study reports the multiple facets of hydropower development risks in China as perceived by main project participants. All groups have a common view on the criticality of safety, and the groups also have their own priorities, i.e., resettlement of migrants, incompetence of subcontractors, project delay, inadequate or incorrect design, premature failure of facilities and ecological and environmental impacts are the key risks to clients, whereas quality of work, financial related risks, reputation, and claims and disputes are the main concerns to contractors. A case study of Three Gorges Project further demonstrates that, hydropower development risks can be effectively managed by encouraging joint efforts of all participants to achieve the goals on producing renewable energy, reducing emissions of CO 2 , and providing important social/economical benefits. Future hydropower development should emphasize the interactions between project delivery, environmental, and economical processes to reach appropriate trade-offs among involving stakeholders, by adequately considering the inter-relations between project participants' risks as well as hydropower project's externalities on a broad view. - Highlights: • Largely attributed to unforeseen geology conditions, safety is critical in hydropower development. • Resettlement of migrants is the principal risk to clients, whereas quality of works is the first concern to contractors. • One group's risks are typically related to others', needing collaborative risk management by participants. • Three Gorges Project plays a key role on producing renewable energy, and providing social/economical benefits. • Hydropower development should emphasize the interactions between

  12. Damages and methods for reparation; Hydropower structures; Skador och reparationsmetoder

    Energy Technology Data Exchange (ETDEWEB)

    Sandstroem, Tomas

    2008-10-15

    structures are also presented in this report. The input used for establishing the most common types of damage are taken from studies made in the USA and Sweden as well as from the literature and from observations made at some Swedish hydropower plants. In conclusion, the following can be said about the need of overlays in regard to Hydropower applications and about the deteriorating processes acting in those environments: The bulk of the damages that occur on the concrete structures can be derived to the environment and the physical and chemical attacks caused by it. The deterioration of concrete structures are therefore more likely to occur due to the environmental affects than due to extensive live loads caused by ice, wind, water, snow etc. Overlays and/toppings are repair techniques that are adequate for repairing most of the damages that occur on concrete structures in Hydropower environments. The performance of the repair work as well as the determination of the composition of the repair mortar or concrete can sometimes be difficult tasks to undertake, often due to the environment (location of the damage and the underlying cause of damage). The continuing work regarding overlays and toppings for Hydropower environments should focus on long-term properties and affects with regards to the whole repair work (including the repair material, the host material and the transition zone). The conclusions above show that there are a rather high potential good with the pursuing of an extensive knowledge in this area

  13. Perspectives for hydropower stations in Switzerland: long-term competitiveness and possibilities for improvement; Perspektiven fuer die Wasserkraftwerke in der Schweiz. Langfristige Wettbewerbsfaehigkeit und moegliche Verbesserungspotenziale

    Energy Technology Data Exchange (ETDEWEB)

    Filippini, M.; Banfi, S. [Istituto di Microeconomia e Economia Pubblica, MecoP, Universita della Svizzera Italiana, Lugano (Switzerland); Luchsinger, C.; Wild, J.; Balmer, M.; Grand, D.; Henkels, L.; Semadeni, M. [Swiss Federal Institute of Technology (ETHZ), Centre for Energy Policy and Economics (CEPE), Zuerich (Switzerland); Gnansounou, E. [Swiss Federal Institute of Technology (EPFL), Laboratoire de systemes energetiques (LASEN), Lausanne (Switzerland)

    2001-07-01

    This first general study - which has the character of a preliminary study - examines the questions if the liberalisation of the electricity market will have a negative effect on the competitiveness of hydropower in the long-term and what measures can be taken against such effects. Long-term competitiveness is defined as the ability of a business in this sector to make investments in renewal in the long-term, i.e. after its concessions have expired. The three main aims of the study are: 1. Assessment of the long-term competitiveness of the sector and identification of the factors which could either have a negative effect on it or improve it, 2. Analysis of cost structures and presentation of measures through which the long-term competitiveness of the sector can be reinforced, 3. Presentation of possible political measures to be taken in this business area in order to improve the long-term competitiveness of hydropower stations. The study identifies the most important factors that determine future competitiveness as being the market prices for electricity and capital costs (depreciation and interest on own and borrowed capital). Further, water fees, taxes and regulations concerning residual water flow can be of great importance for investment decisions, in particular for those enterprises that operate close to their profitability limits. The results of the analysis indicate that, in the future, a considerable number of enterprises must be reckoned with that will refrain from renewing their plant. Such outcomes depend, of course, on developments in electricity market prices, specific investment costs, rates of interest and other economic, political, and legal conditions. Making a prognosis about the development of such parameters is linked with a high degree of uncertainty. By means of sensitivity calculations and the definition of various scenarios, attempts are made to take these uncertainties into account . Finally, the study makes reference to the fact that

  14. Generation of statistical scenarios of short-term wind power production

    DEFF Research Database (Denmark)

    Pinson, Pierre; Papaefthymiou, George; Klockl, Bernd

    2007-01-01

    Short-term (up to 2-3 days ahead) probabilistic forecasts of wind power provide forecast users with a paramount information on the uncertainty of expected wind generation. Whatever the type of these probabilistic forecasts, they are produced on a per horizon basis, and hence do not inform...... on the development of the forecast uncertainty through forecast series. This issue is addressed here by describing a method that permits to generate statistical scenarios of wind generation that accounts for the interdependence structure of prediction errors, in plus of respecting predictive distributions of wind...

  15. Short-term mechanisms influencing volumetric brain dynamics

    Directory of Open Access Journals (Sweden)

    Nikki Dieleman

    2017-01-01

    Full Text Available With the use of magnetic resonance imaging (MRI and brain analysis tools, it has become possible to measure brain volume changes up to around 0.5%. Besides long-term brain changes caused by atrophy in aging or neurodegenerative disease, short-term mechanisms that influence brain volume may exist. When we focus on short-term changes of the brain, changes may be either physiological or pathological. As such determining the cause of volumetric dynamics of the brain is essential. Additionally for an accurate interpretation of longitudinal brain volume measures by means of neurodegeneration, knowledge about the short-term changes is needed. Therefore, in this review, we discuss the possible mechanisms influencing brain volumes on a short-term basis and set-out a framework of MRI techniques to be used for volumetric changes as well as the used analysis tools. 3D T1-weighted images are the images of choice when it comes to MRI of brain volume. These images are excellent to determine brain volume and can be used together with an analysis tool to determine the degree of volume change. Mechanisms that decrease global brain volume are: fluid restriction, evening MRI measurements, corticosteroids, antipsychotics and short-term effects of pathological processes like Alzheimer's disease, hypertension and Diabetes mellitus type II. Mechanisms increasing the brain volume include fluid intake, morning MRI measurements, surgical revascularization and probably medications like anti-inflammatory drugs and anti-hypertensive medication. Exercise was found to have no effect on brain volume on a short-term basis, which may imply that dehydration caused by exercise differs from dehydration by fluid restriction. In the upcoming years, attention should be directed towards studies investigating physiological short-term changes within the light of long-term pathological changes. Ultimately this may lead to a better understanding of the physiological short-term effects of

  16. Evaluation of Power Generation Efficiency of Cascade Hydropower Plants: A Case Study

    Directory of Open Access Journals (Sweden)

    Jiahua Wei

    2013-02-01

    Full Text Available Effective utilization of scarce water resources has presented a significant challenge to respond to the needs created by rapid economic growth in China. In this study, the efficiency of the joint operation of the Three Gorges and Gezhouba cascade hydropower plants in terms of power generation was evaluated on the basis of a precise simulation-optimization technique. The joint operation conditions of the Three Gorges and Gezhouba hydropower plants between 2004 and 2010 were utilized in this research in order to investigate the major factors that could affect power output of the cascade complex. The results showed that the current power output of the Three Gorges and Gezhouba cascade complex had already reached around 90% of the maximum theoretical value. Compared to other influencing factors evaluated in this study, the accuracy of hydrological forecasts and flood control levels can have significant impact on the power generating efficiency, whereas the navigation has a minor influence. This research provides a solid quantitative-based methodology to assess the operation efficiency of cascade hydropower plants, and more importantly, proposes potential methods that could improve the operation efficiency of cascade hydropower plants.

  17. 75 FR 16456 - Inglis Hydropower, LLC; Notice Soliciting Scoping Comments

    Science.gov (United States)

    2010-04-01

    ... Hydropower, LLC; Notice Soliciting Scoping Comments March 26, 2010. Take notice that the following...: Inglis Hydropower, LLC. e. Name of Project: Inglis Hydropower Project. f. Location: The proposed project... Commission staff intends to prepare a single Environmental Assessment (EA) for the Inglis Hydropower Project...

  18. Tapping hidden hydropower potential in Swiss Alpine catchments in the context of the planned nuclear power phase out

    Science.gov (United States)

    Santos, Ana Clara; Schaefli, Bettina; Manso, Pedro; Schleiss, Anton; Portela, Maria Manuela; Rinaldo, Andrea

    2015-04-01

    In its Energy Strategy 2050, Switzerland is revising its energy perspectives with a strong focus on renewable sources of energy and in particular hydropower. In this context, the Swiss Government funded a number of competence centers for energy research (SCCERs), including one on the Supply of Energy (SCCER-SoE), which develops fundamental research and innovative solutions in geoenergies and hydropower . Hydropower is already the major energy source in Switzerland, corresponding to approximately 55% of the total national electricity production (which was 69 TWh in 2014). The Energy Strategy 2050 foresees at least a net increase by 1.53 TWh/year in average hydrological conditions, in a context were almost all major river systems are already exploited and a straightforward application of recent environmental laws will impact (reduce) current hydropower production. In this contribution, we present the roadmap of the SCCER-SoE and an overview of our strategy to unravel currently non-exploited hydropower potential, in particular in river systems that are already used for hydropower production. The aim is hereby to quantify non-exploited natural flows, unnecessary water spills or storage volume deficits, whilst considering non-conventional approaches to water resources valuation and management. Such a better understanding of the current potential is paramount to justify future scenarios of adaptation of the existing hydropower infrastructure combining the increase of storage capacity with new connections between existing reservoirs, heightening or strengthening existing dams, increasing the operational volume of natural lakes (including new glacier lakes), or by building new dams. Tapping hidden potential shall also require operational changes to benefit from new flow patterns emerging under an evolving climate and in particular in the context of the ongoing glacier retreat. The paper shall present a broad view over the mentioned issues and first conclusions of ongoing

  19. Verbal Short-Term Memory Span in Speech-Disordered Children: Implications for Articulatory Coding in Short-Term Memory.

    Science.gov (United States)

    Raine, Adrian; And Others

    1991-01-01

    Children with speech disorders had lower short-term memory capacity and smaller word length effect than control children. Children with speech disorders also had reduced speech-motor activity during rehearsal. Results suggest that speech rate may be a causal determinant of verbal short-term memory capacity. (BC)

  20. Real-time energy resources scheduling considering short-term and very short-term wind forecast

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Marco; Sousa, Tiago; Morais, Hugo; Vale, Zita [Polytechnic of Porto (Portugal). GECAD - Knowledge Engineering and Decision Support Research Center

    2012-07-01

    This paper proposes an energy resources management methodology based on three distinct time horizons: day-ahead scheduling, hour-ahead scheduling, and real-time scheduling. In each scheduling process the update of generation and consumption operation and of the storage and electric vehicles storage status are used. Besides the new operation conditions, the most accurate forecast values of wind generation and of consumption using results of short-term and very short-term methods are used. A case study considering a distribution network with intensive use of distributed generation and electric vehicles is presented. (orig.)

  1. Low-head hydropower impacts on steam dissolved oxygen

    International Nuclear Information System (INIS)

    Thene, J.R.; Stefan, H.G.; Daniil, E.I.

    1989-01-01

    A method to evaluate the effect of hydropower development on downstream dissolved oxygen (DO) is presented for a low head dam. Water, previously aerated during release over spillways and under gates, is diverted through the hydropower facility without further aeration. The oxygen transfer that occurs as a result of air entrainment at the various release points of a dam is measured. Oxygen transfer efficiencies are calculated and incorporated into an oxygen transfer model to predict average release DO concentrations. This model is used to systematically determine the effect of hydropower operation on downstream DO. Operational alternatives are investigated and a simple operational guide is developed to mitigate the effects of hydropower operation. Combinations of reduced generation and optimal releases from the dam allow the hydropower facility to operate within DO standards

  2. Water, energy and agricultural landuse trends at Shiroro hydropower station and environs

    Science.gov (United States)

    Adegun, Olubunmi; Ajayi, Olalekan; Badru, Gbolahan; Odunuga, Shakirudeen

    2018-02-01

    The study examines the interplay among water resources, hydropower generation and agricultural landuse at the Shiroro hydropower station and its environs, in north-central Nigeria. Non-parametric trend analysis, hydropower footprint estimation, reservoir performance analysis, change detection analysis, and inferential statistics were combined to study the water-energy and food security nexus. Results of Mann-Kendall test and Sen's slope estimator for the period 1960 to 2013 showed a declining rainfall trend at Jos, around River Kaduna headwaters at -2.6 mm yr-1, while rainfall at Kaduna and Minna upstream and downstream of the reservoir respectively showed no trend. Estimates of hydropower footprint varied between 130.4 and 704.1 m3 GJ-1 between 1995 and 2013. Power generation reliability and resilience of the reservoir was 31.6 and 38.5 % respectively with year 2011 being the most vulnerable and least satisfactory. In addition to poor reliability and resilience indices, other challenges militating against good performance of hydropower generation includes population growth and climate change issues as exemplified in the downward trend observed at the headwaters. Water inflow and power generation shows a weak positive relationship with correlation coefficient (r) of 0.48, indicating less than optimal power generation. Total area of land cultivated increased from 884.59 km2 in 1986 prior to the commissioning of the hydropower station to 1730.83 km2 in 2016 which signifies an increased contribution of the dam to ensuring food security. The reality of reducing upstream rainfall amount coupled with high water footprint of electricity from the reservoir, therefore requires that a long term roadmap to improve operational coordination and management have to be put in place.

  3. The Mind and Brain of Short-Term Memory

    OpenAIRE

    Jonides, John; Lewis, Richard L.; Nee, Derek Evan; Lustig, Cindy A.; Berman, Marc G.; Moore, Katherine Sledge

    2008-01-01

    The past 10 years have brought near-revolutionary changes in psychological theories about short-term memory, with similarly great advances in the neurosciences. Here, we critically examine the major psychological theories (the “mind”) of short-term memory and how they relate to evidence about underlying brain mechanisms. We focus on three features that must be addressed by any satisfactory theory of short-term memory. First, we examine the evidence for the architecture of short-term memory, w...

  4. Very-long-term and short-term chromatic adaptation: are their influences cumulative?

    Science.gov (United States)

    Belmore, Suzanne C; Shevell, Steven K

    2011-02-09

    Very-long-term (VLT) chromatic adaptation results from exposure to an altered chromatic environment for days or weeks. Color shifts from VLT adaptation are observed hours or days after leaving the altered environment. Short-term chromatic adaptation, on the other hand, results from exposure for a few minutes or less, with color shifts measured within seconds or a few minutes after the adapting light is extinguished; recovery to the pre-adapted state is complete in less than an hour. Here, both types of adaptation were combined. All adaptation was to reddish-appearing long-wavelength light. Shifts in unique yellow were measured following adaptation. Previous studies demonstrate shifts in unique yellow due to VLT chromatic adaptation, but shifts from short-term chromatic adaptation to comparable adapting light can be far greater than from VLT adaptation. The question considered here is whether the color shifts from VLT adaptation are cumulative with large shifts from short-term adaptation or, alternatively, does simultaneous short-term adaptation eliminate color shifts caused by VLT adaptation. The results show the color shifts from VLT and short-term adaptation together are cumulative, which indicates that both short-term and very-long-term chromatic adaptation affect color perception during natural viewing. Copyright © 2010 Elsevier Ltd. All rights reserved.

  5. A model of the environmental impacts of hydropower projects

    International Nuclear Information System (INIS)

    Kemppainen, T.; Haemaelaeinen, I.

    1992-01-01

    The aim was to create a model of the effects of hydropower modernization and extension projects in Finland. To illustrate the effects of hydropower projects a checklist in the form of matrice was constructed. In this matrice all issues that could be significant in future hydropower projects were collected. Stable physical environmental changes are the starting-point for this matrice. The temporary change of hydropower constructions have also been under consideration. These are mainly environmental changes during construction. In chapter two the effects of hydropower modernization and extension projects physical environmental changes were examined. In chapter three the matrice was applied to some example cases. The cases were chosen to represent future hydropower projects. In addition these example cases represent urban areas, rural areas and uninhabited areas. The example cases were the extension of Tainionkoski hydropower plant at Vuoksi river, the modernization of Aeetsae power plant at Kokemaeenjoki river, the modernization of Stadsfors power plant at Lapuanjoki river in the centre of Uusikaarlepyy town and the construction of Kaitfors power plant at Perhonjoki river. Conclusions from usability of the model can be drawn on the ground of the example cases. The purpose of the model is to produce a checklist of estimated environmental effects in hydropower project of various kinds. Examination of issues within the model depends on local circumstances. Endangered animal and plant species, for example, can be studied and estimated only if endangered animal and plant species exist in the area of hydropower plant. Furthermore, the direction and extent of environmental effects depend on the local circumstances. The model is mainly a checklist of environmental effects caused by hydropower plant projects

  6. Hydropower in China at present and its further development

    Energy Technology Data Exchange (ETDEWEB)

    Chang, XiaoLin; Zhou, Wei [State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072 (China); Liu, Xinghong [School of Civil and Architectural Engineering, Wuhan University, Wuhan 430072 (China)

    2010-11-15

    At present, China's economic development faces energy challenge, and the appropriate solution of energy bottleneck is the key to healthy, rapid and sustainable development. China's gross amount of hydraulic resource ranks first in the world; however, because of low level of development, hydraulic resource has a broad development prospect. Now, China's hydropower development is in its peak period. By the end of 2004, the gross installed hydropower capacity of China broke through 100 million kW. From there, it has remained in the top slot worldwide. The vigorous development of hydropower is necessary because of the energy shortage and environmental pollution in China in order to attain sustainable development of China's economy. Abundant hydraulic resource, huge market demands, the strategy of western development and the favorable environment of economic development provide hydropower construction with unprecedented advantages and opportunities. Chins hydropower development aims at an installed hydropower capacity of up to 194 million kW by 2010, accounting for 23.1% of the gross installed power capacity and 35% of hydropower resource. Finally, we present the general condition of Three Gorges project as well as the new mode of hydropower development of Three Gorges Project Corporation, i.e., cascade development. (author)

  7. Probabilistic-Multiobjective Comparison of User-Defined Operating Rules. Case Study: Hydropower Dam in Spain

    Directory of Open Access Journals (Sweden)

    Paola Bianucci

    2015-03-01

    Full Text Available A useful tool is proposed in this paper to assist dam managers in comparing and selecting suitable operating rules. This procedure is based on well-known multiobjective and probabilistic methodologies, which were jointly applied here to assess and compare flood control strategies in hydropower reservoirs. The procedure consisted of evaluating the operating rules’ performance using a simulation fed by a representative and sufficiently large flood event series. These flood events were obtained from a synthetic rainfall series stochastically generated by using the RainSimV3 model coupled with a deterministic hydrological model. The performance of the assessed strategies was characterized using probabilistic variables. Finally, evaluation and comparison were conducted by analyzing objective functions which synthesize different aspects of the rules’ performance. These objectives were probabilistically defined in terms of risk and expected values. To assess the applicability and flexibility of the tool, it was implemented in a hydropower dam located in Galicia (Northern Spain. This procedure allowed alternative operating rule to be derived which provided a reasonable trade-off between dam safety, flood control, operability and energy production.

  8. China’s rising hydropower demand challenges water sector

    Science.gov (United States)

    Liu, Junguo; Zhao, Dandan; Gerbens-Leenes, P. W.; Guan, Dabo

    2015-01-01

    Demand for hydropower is increasing, yet the water footprints (WFs) of reservoirs and hydropower, and their contributions to water scarcity, are poorly understood. Here, we calculate reservoir WFs (freshwater that evaporates from reservoirs) and hydropower WFs (the WF of hydroelectricity) in China based on data from 875 representative reservoirs (209 with power plants). In 2010, the reservoir WF totaled 27.9 × 109 m3 (Gm3), or 22% of China’s total water consumption. Ignoring the reservoir WF seriously underestimates human water appropriation. The reservoir WF associated with industrial, domestic and agricultural WFs caused water scarcity in 6 of the 10 major Chinese river basins from 2 to 12 months annually. The hydropower WF was 6.6 Gm3 yr−1 or 3.6 m3 of water to produce a GJ (109 J) of electricity. Hydropower is a water intensive energy carrier. As a response to global climate change, the Chinese government has promoted a further increase in hydropower energy by 70% by 2020 compared to 2012. This energy policy imposes pressure on available freshwater resources and increases water scarcity. The water-energy nexus requires strategic and coordinated implementations of hydropower development among geographical regions, as well as trade-off analysis between rising energy demand and water use sustainability. PMID:26158871

  9. Irrelevant sound disrupts speech production: exploring the relationship between short-term memory and experimentally induced slips of the tongue.

    Science.gov (United States)

    Saito, Satoru; Baddeley, Alan

    2004-10-01

    To explore the relationship between short-term memory and speech production, we developed a speech error induction technique. The technique, which was adapted from a Japanese word game, exposed participants to an auditory distractor word immediately before the utterance of a target word. In Experiment 1, the distractor words that were phonologically similar to the target word led to a greater number of errors in speaking the target than did the dissimilar distractor words. Furthermore, the speech error scores were significantly correlated with memory span scores. In Experiment 2, memory span scores were again correlated with the rate of the speech errors that were induced from the task-irrelevant speech sounds. Experiment 3 showed a strong irrelevant-sound effect in the serial recall of nonwords. The magnitude of the irrelevant-sound effects was not affected by phonological similarity between the to-be-remembered nonwords and the irrelevant-sound materials. Analysis of recall errors in Experiment 3 also suggested that there were no essential differences in recall error patterns between the dissimilar and similar irrelevant-sound conditions. We proposed two different underlying mechanisms in immediate memory, one operating via the phonological short-term memory store and the other via the processes underpinning speech production.

  10. Short term memory in echo state networks

    OpenAIRE

    Jaeger, H.

    2001-01-01

    The report investigates the short-term memory capacity of echo state recurrent neural networks. A quantitative measure MC of short-term memory capacity is introduced. The main result is that MC 5 N for networks with linear Output units and i.i.d. input, where N is network size. Conditions under which these maximal memory capacities are realized are described. Several theoretical and practical examples demonstrate how the short-term memory capacities of echo state networks can be exploited for...

  11. Short Term Electric Production Technology Switching Under Carbon Cap and Trade

    Directory of Open Access Journals (Sweden)

    Donald F. Larson

    2012-10-01

    Full Text Available This study examines fuel switching in electricity production following the introduction of the European Union’s Emissions Trading System (EU ETS for greenhouse gas emissions. A short-run restricted cost equation is estimated with carbon permits, high-carbon fuels, and low carbon fuels as variable inputs. Shadow values and substitution elasticities for carbon-free energy resources from nuclear, hydroelectric and renewable sources are imputed from the cost equation. The empirical analysis examines 12 European countries using monthly data on fuel use, prices, and electricity generation during the first phase of the European Emissions Trading System. Despite low emission permit prices, this study finds statistically significant substitution between fossil fuels and carbon free sources of energy for electric power production. Significant substitution between fossil fuels and nuclear energy also was found. Still, while 18 of the 20 substitution elasticities are statistically significant, they are all less than unity, consistent with limited substitution. Overall, these results suggest that prices for carbon emission permits relative to prices for carbon and carbon free sources of energy do matter but that electric power producers have limited operational flexibility in the short-run to satisfy greenhouse gas emission limits.

  12. Methane Ebullition in Temperate Hydropower Reservoirs and Implications for US Policy on Greenhouse Gas Emissions.

    Science.gov (United States)

    Miller, Benjamin L; Arntzen, Evan V; Goldman, Amy E; Richmond, Marshall C

    2017-10-01

    The United States is home to 2198 dams actively used for hydropower production. With the December 2015 consensus adoption of the United Nations Framework Convention on Climate Change Paris Agreement, it is important to accurately quantify anthropogenic greenhouse gas emissions. Methane ebullition, or methane bubbles originating from river or lake sediments, has been shown to account for nearly all methane emissions from tropical hydropower reservoirs to the atmosphere. However, distinct ebullitive methane fluxes have been studied in comparatively few temperate hydropower reservoirs globally. This study measures ebullitive and diffusive methane fluxes from two eastern Washington reservoirs, and synthesizes existing studies of methane ebullition in temperate, boreal, and tropical hydropower reservoirs. Ebullition comprises nearly all methane emissions (>97%) from this study's two eastern Washington hydropower reservoirs to the atmosphere. Summer methane ebullition from these reservoirs was higher than ebullition in six southeastern U.S. hydropower reservoirs, however it was similar to temperate reservoirs in other parts of the world. Our literature synthesis suggests that methane ebullition from temperate hydropower reservoirs can be seasonally elevated compared to tropical climates, however annual emissions are likely to be higher within tropical climates, emphasizing the possible range of methane ebullition fluxes and the need for the further study of temperate reservoirs. Possible future changes to the Intergovernmental Panel on Climate Change and UNFCCC guidelines for national greenhouse gas inventories highlights the need for accurate assessment of reservoir emissions.

  13. Methane Ebullition in Temperate Hydropower Reservoirs and Implications for US Policy on Greenhouse Gas Emissions

    Science.gov (United States)

    Miller, Benjamin L.; Arntzen, Evan V.; Goldman, Amy E.; Richmond, Marshall C.

    2017-10-01

    The United States is home to 2198 dams actively used for hydropower production. With the December 2015 consensus adoption of the United Nations Framework Convention on Climate Change Paris Agreement, it is important to accurately quantify anthropogenic greenhouse gas emissions. Methane ebullition, or methane bubbles originating from river or lake sediments, has been shown to account for nearly all methane emissions from tropical hydropower reservoirs to the atmosphere. However, distinct ebullitive methane fluxes have been studied in comparatively few temperate hydropower reservoirs globally. This study measures ebullitive and diffusive methane fluxes from two eastern Washington reservoirs, and synthesizes existing studies of methane ebullition in temperate, boreal, and tropical hydropower reservoirs. Ebullition comprises nearly all methane emissions (>97%) from this study's two eastern Washington hydropower reservoirs to the atmosphere. Summer methane ebullition from these reservoirs was higher than ebullition in six southeastern U.S. hydropower reservoirs, however it was similar to temperate reservoirs in other parts of the world. Our literature synthesis suggests that methane ebullition from temperate hydropower reservoirs can be seasonally elevated compared to tropical climates, however annual emissions are likely to be higher within tropical climates, emphasizing the possible range of methane ebullition fluxes and the need for the further study of temperate reservoirs. Possible future changes to the Intergovernmental Panel on Climate Change and UNFCCC guidelines for national greenhouse gas inventories highlights the need for accurate assessment of reservoir emissions.

  14. Phasing in wind-power in Norway: Network congestion and crowding-out of hydropower

    International Nuclear Information System (INIS)

    Forsund, Finn R.; Singh, Balbir; Jensen, Trond; Larsen, Cato

    2008-01-01

    The objective of this paper is to investigate the effects on utilisation of existing hydropower in a region of investing in significant wind-power in the region within the present network. Policy simulations are conducted using a dynamic system-wide model that is calibrated to reflect the structure of the Nordic power market. This model is the one used by the Norwegian electricity regulator and large hydropower companies in Norway for scheduling of hydro and market analyses. Simulations are carried out for different inflow situations based on past observations going back 60 years. Introduction of wind-power leads to significant increase in network congestion in the region, lower hydropower production, higher level of storage, increased spillage of water, and considerably lower price level in the local region in question

  15. Short-term energy outlook. Quarterly projections, first quarter 1995

    International Nuclear Information System (INIS)

    1995-02-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). The forecast period for this issue of the Outlook extends from the first quarter of 1995 through the fourth quarter of 1996. Values for the fourth quarter of 1994, however, are preliminary EIA estimates or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the first quarter 1995 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the Short-Term Integrated Forecasting System (STIFS). The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service

  16. Hydropower harvesting from a small scale reciprocating system

    Energy Technology Data Exchange (ETDEWEB)

    Malla, Ramesh B.; Shrestha, Binu; Bagtzoglou, Amvrossios; Drasdis, Jonathon [Department of Civil and Environmental Engineering, University of Connecticut, 261 Glenbrook Road, Storrs, CT 06269-2037 (United States); Johnson, Paul [eGen LLC, 1084 Shennecossett Road, Groton, CT 06340 (United States)

    2011-05-15

    Conventional hydropower systems that can take advantage of low head movement of water require substantial flow rates. However, these systems cannot harvest hydro energy from small sources of water with low head and low discharge, such as streams and creeks. The reciprocating hydropower system discussed in this paper can harvest power from such low flow discharge and low head sources. This paper presents a detailed proof-of-concept study of the hydropower model, including the underlining theoretical principles. Laboratory test results demonstrating the dependence of the lift force in the reciprocating small scale hydropower model as a function of flow velocity, size and rotational speed of the cylinder and comparison of the results with a previous study are also included. Two methods of power harvesting from the output displacement obtained from the hydropower system are discussed. The first employs electromagnetic induction principles and the other is based on a linear inertial generator using a conventional second order spring mass damper system. Finally, results from a finite element analysis of the hydropower system are presented and facilitate future design of the structural aspects of the housing for the reciprocating cylinder. (author)

  17. The role of hydropower in environment ally sustainable energy development

    International Nuclear Information System (INIS)

    Gabriel, H.F.

    2005-01-01

    Hydropower has historically been the renewable energy leader, and from a technical-cost perspective, is very likely to remain the only viable renewable energy source for many countries. In recent years, hydropower has been much maligned, especially by NGOs, for not being a sustainable source of energy. Though hydropower is clearly a renewable source of energy, but the question arises whether it can also be sustainable. Hydropower can play an increasingly important role in enabling communities around the world to meet sustainability objectives. To become more accepted as a key contributor to sustainable energy systems, new and existing hydropower projects need to be built and operated in an environmentally, socially and economically sustainable manner. This paper highlights the sustain ability aspects of hydropower and discusses the criteria for selection of environmentally friendly hydropower project sites so that that hydropower can be developed in a sustainable manner and once again be considered favorably in the planning of generation mix for new energy development. Sustainability of hydropower projects involves treating both the social and environmental sustainability of the project at an early stage and including the interests of all stakeholders of the project. As a case study, the Ghazi- Barotha Hydropower Project (GBHP) in Pakistan has been selected, as it is the best example in managing the social issues and gaining public acceptance because of proper planning and addressing environmental and social issues at an early stage. (author)

  18. Short term and medium term power distribution load forecasting by neural networks

    International Nuclear Information System (INIS)

    Yalcinoz, T.; Eminoglu, U.

    2005-01-01

    Load forecasting is an important subject for power distribution systems and has been studied from different points of view. In general, load forecasts should be performed over a broad spectrum of time intervals, which could be classified into short term, medium term and long term forecasts. Several research groups have proposed various techniques for either short term load forecasting or medium term load forecasting or long term load forecasting. This paper presents a neural network (NN) model for short term peak load forecasting, short term total load forecasting and medium term monthly load forecasting in power distribution systems. The NN is used to learn the relationships among past, current and future temperatures and loads. The neural network was trained to recognize the peak load of the day, total load of the day and monthly electricity consumption. The suitability of the proposed approach is illustrated through an application to real load shapes from the Turkish Electricity Distribution Corporation (TEDAS) in Nigde. The data represents the daily and monthly electricity consumption in Nigde, Turkey

  19. A framework to identify Pareto-efficient subdaily environmental flow constraints on hydropower reservoirs using a grid-wide power dispatch model

    Science.gov (United States)

    Olivares, Marcelo A.; Haas, Jannik; Palma-Behnke, Rodrigo; Benavides, Carlos

    2015-05-01

    Hydrologic alteration due to hydropeaking reservoir operations is a main concern worldwide. Subdaily environmental flow constraints (ECs) on operations can be promising alternatives for mitigating negative impacts. However, those constraints reduce the flexibility of hydropower plants, potentially with higher costs for the power system. To study the economic and environmental efficiency of ECs, this work proposes a novel framework comprising four steps: (i) assessment of the current subdaily hydrologic alteration; (ii) formulation and implementation of a short-term, grid-wide hydrothermal coordination model; (iii) design of ECs in the form of maximum ramping rates (MRRs) and minimum flows (MIFs) for selected hydropower reservoirs; and (iv) identification of Pareto-efficient solutions in terms of grid-wide costs and the Richard-Baker flashiness index for subdaily hydrologic alteration (SDHA). The framework was applied to Chile's main power grid, assessing 25 EC cases, involving five MIFs and five MRRs. Each case was run for a dry, normal, and wet water year type. Three Pareto-efficient ECs are found, with remarkably small cost increase below 2% and a SDHA improvement between 28% and 90%. While the case involving the highest MIF worsens the flashiness of another basin, the other two have no negative effect on other basins and can be recommended for implementation.

  20. Short-chain fatty acids production and microbial community in sludge alkaline fermentation: Long-term effect of temperature.

    Science.gov (United States)

    Yuan, Yue; Liu, Ye; Li, Baikun; Wang, Bo; Wang, Shuying; Peng, Yongzhen

    2016-07-01

    Sludge alkaline fermentation has been reported to achieve efficient short-chain fatty acids (SCFAs) production. Temperature played important role in further improved SCFAs production. Long-term SCFAs production from sludge alkaline fermentation was compared between mesotherm (30±2°C) and microtherm (15±2°C). The study of 90days showed that mesotherm led to 2.2-folds production of SCFAs as microtherm and enhanced the production of acetic acid as major component of SCFAs. Soluble protein and carbohydrate at mesotherm was 2.63-folds as that at microtherm due to higher activities of protease and α-glucosidase, guaranteeing efficient substrates to produce SCFAs. Illumina MiSeq sequencing revealed that microtherm increased the abundance of Corynebacterium, Alkaliflexus, Pseudomonas and Guggenheimella, capable of enhancing hydrolysis. Hydrolytic bacteria, i.e. Alcaligenes, Anaerolinea and Ottowia, were enriched at mesotherm. Meanwhile, acidogenic bacteria showed higher abundance at mesotherm than microtherm. Therefore, enrichment of functional bacteria and higher microbial activities resulted in the improved SCFAs at mesotherm. Copyright © 2016 Elsevier Ltd. All rights reserved.

  1. Effect of short- and long-term feeding of L-carnitine and its congeners on the production of eicosanoids from rat peritoneal leukocytes

    NARCIS (Netherlands)

    Garrelds, I.M.; Elliott, G.R.; Zijlstra, F.; Bonta, I.

    1994-01-01

    The effect of short- and long-term feeding with L-carnitine, L-acetyl carnitine and L-propionyl carnitine on the production of eicosanoids from in vitro stimulated carrageenan-induced rat peritoneal macrophages was investigated. Both young (4 weeks) and old (18 months) rats were used. A lower number

  2. Mid and long-term optimize scheduling of cascade hydro-power stations based on modified GA-POA method

    Directory of Open Access Journals (Sweden)

    J. Li

    2018-06-01

    Full Text Available In this paper, to explore the efficiency and rationality of the cascade combined generation, a cascade combined optimal model with the maximum generating capacity is established, and solving the model by the modified GA-POA method. It provides a useful reference for the joint development of cascade hydro-power stations in large river basins. The typical annual runoff data are selected to calculate the difference between the calculated results under different representative years. The results show that the cascade operation of cascaded hydro-power stations can significantly increase the overall power generation of cascade and ease the flood risk caused by concentration of flood season.

  3. Conflicting hydropower development and aquatic ecosystem conservation in Bhutan

    Science.gov (United States)

    Wi, S.; Yang, Y. C. E.

    2017-12-01

    Hydropower is one of the clean energy sources that many Himalayan countries are eager to develop to solve their domestic energy deficit issue such as India, Nepal and Pakistan. Like other Himalayan countries, Bhutan also has a great potential for hydropower development. However, Bhutan is one of few countries that has a domestic energy surplus and export its hydropower generation to neighboring countries (mainly to India). Exporting hydropower is one of the major economic sources in Bhutan. However, constructions of dams and reservoirs for hydropower development inevitably involve habitat fragmentation, causing a conflict of interest with the pursuit of value in aquatic ecosystem conservation. The objectives of this study is to 1) develop a distributed hydrologic model with snow and glacier module to simulate the hydrologic regimes of seven major watersheds in Bhutan; 2) apply the hydrologic model to compute hydropower generation for all existing and potential dams; 3) evaluate cascade impacts of each individual dam on downstream regions by employing three hydro-ecological indicators: the River Connectivity Index (RCI), Dendritic Connectivity Index (DCI), total affected river stretch (ARS), and 4) analyze the tradeoffs between hydropower generation and river connectivity at the national scale by means of a multiple objective genetic algorithm. Modeling results of three Pareto Fronts between ecological indicators and hydropower generation accompany with future energy export targets from the government can inform dam selections that maximizing hydropower generation while minimizing the impact on the aquatic ecosystem (Figure 1a). The impacts of climate change on these Pareto front are also explored to identify robust dam selection under changing temperature and precipitation (Figure 1b).

  4. Short-term fasting protects mice against γ ray radiation

    International Nuclear Information System (INIS)

    Zhu Shengnan; Gu Xiuling; Song Lian; Tong Jian; Li Jianxiang

    2012-01-01

    Objective: To investigate the antagonistic effects of short-term fasting against 60 Co γ ray radiation. Methods: After fasting ICR mice were irradiated for 3 min at a dose rate of 2.5 Gy/min and then returned to normal diet. General situation, body weight changes, food consumption and toxic status were observed. WBC, organ index and anti-oxidative ability (ROS, SOD, MDA, T-AOC) were analyzed. Results: After 60 Co γ ray radiation, the mice exhibited severe toxic symptoms before death. The survival rates were 0 for control and 12 h group, 12.5% for 48 h group and 50% for 72 h group respectively. ROS production of 72 h group was reduced compared with 0 h group (P<0.05). Conclusion: Short-term fasting may attenuate radiation induced injuries, evidenced by a significant increase in mice survival rate. (authors)

  5. Does tonality boost short-term memory in congenital amusia?

    Science.gov (United States)

    Albouy, Philippe; Schulze, Katrin; Caclin, Anne; Tillmann, Barbara

    2013-11-06

    Congenital amusia is a neuro-developmental disorder of music perception and production. Recent findings have demonstrated that this deficit is linked to an impaired short-term memory for tone sequences. As it has been shown before that non-musicians' implicit knowledge of musical regularities can improve short-term memory for tone information, the present study investigated if this type of implicit knowledge could also influence amusics' short-term memory performance. Congenital amusics and their matched controls, who were non-musicians, had to indicate whether sequences of five tones, presented in pairs, were the same or different; half of the pairs respected musical regularities (tonal sequences) and the other half did not (atonal sequences). As previously reported for non-musician participants, the control participants showed better performance (as measured with d') for tonal sequences than for atonal ones. While this improvement was not observed in amusics, both control and amusic participants showed faster response times for tonal sequences than for atonal sequences. These findings suggest that some implicit processing of tonal structures is potentially preserved in congenital amusia. This observation is encouraging as it strengthens the perspective to exploit implicit knowledge to help reducing pitch perception and memory deficits in amusia. © 2013 Elsevier B.V. All rights reserved.

  6. The potential of hydropower - Scenarios in the area of conflict between the economy and politics

    International Nuclear Information System (INIS)

    Groetzinger, S.

    2006-01-01

    This article takes a look at how hydropower in Switzerland has developed over the years and the potential for its further use in the future. The article reviews developments in the use of hydropower in Switzerland over the years and discusses the possibilities that still exist for increasing the amount of power produced. Details on the various estimates of production potential are quoted for the period up to 2050. Both technical and ecological aspects are reviewed. Diagrams and tables provide data on the subject. The development of the various scenarios is described. The total potential of hydropower and the development of a strategy for the use of this CO 2 -neutral form of energy are briefly discussed

  7. Standard Modular Hydropower Technology Acceleration Workshop: Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Brennan T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); DeNeale, Scott T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Witt, Adam M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Mobley, Miles H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Fernandez, Alisha R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-08-01

    In support of the Department of Energy (DOE) funded Standard Modular Hydropower (SMH) Technology Acceleration project, Oak Ridge National Laboratory (ORNL) staff convened with five small hydropower technology entrepreneurs on June 14 and 15, 2017 to discuss gaps, challenges, and opportunities for small modular hydropower development. The workshop was designed to walk through SMH concepts, discuss the SMH research vision, assess how each participant’s technology aligns with SMH concepts and research, and identify future pathways for mutually beneficial collaboration that leverages ORNL expertise and entrepreneurial industry experience. The goal coming out of the workshop is to advance standardized, scalable, modular hydropower technologies and development approaches with sustained and open dialogue among diverse stakeholder groups.

  8. Evaluating and optimizing the operation of the hydropower system in the Upper Yellow River: A general LINGO-based integrated framework.

    Science.gov (United States)

    Si, Yuan; Li, Xiang; Yin, Dongqin; Liu, Ronghua; Wei, Jiahua; Huang, Yuefei; Li, Tiejian; Liu, Jiahong; Gu, Shenglong; Wang, Guangqian

    2018-01-01

    The hydropower system in the Upper Yellow River (UYR), one of the largest hydropower bases in China, plays a vital role in the energy structure of the Qinghai Power Grid. Due to management difficulties, there is still considerable room for improvement in the joint operation of this system. This paper presents a general LINGO-based integrated framework to study the operation of the UYR hydropower system. The framework is easy to use for operators with little experience in mathematical modeling, takes full advantage of LINGO's capabilities (such as its solving capacity and multi-threading ability), and packs its three layers (the user layer, the coordination layer, and the base layer) together into an integrated solution that is robust and efficient and represents an effective tool for data/scenario management and analysis. The framework is general and can be easily transferred to other hydropower systems with minimal effort, and it can be extended as the base layer is enriched. The multi-objective model that represents the trade-off between power quantity (i.e., maximum energy production) and power reliability (i.e., firm output) of hydropower operation has been formulated. With equivalent transformations, the optimization problem can be solved by the nonlinear programming (NLP) solvers embedded in the LINGO software, such as the General Solver, the Multi-start Solver, and the Global Solver. Both simulation and optimization are performed to verify the model's accuracy and to evaluate the operation of the UYR hydropower system. A total of 13 hydropower plants currently in operation are involved, including two pivotal storage reservoirs on the Yellow River, which are the Longyangxia Reservoir and the Liujiaxia Reservoir. Historical hydrological data from multiple years (2000-2010) are provided as input to the model for analysis. The results are as follows. 1) Assuming that the reservoirs are all in operation (in fact, some reservoirs were not operational or did not

  9. Power source labelling and hydro-power - a chance or a risk?

    International Nuclear Information System (INIS)

    Wurche, P.

    2005-01-01

    This short article discusses the electricity labelling legislation passed in Switzerland in November 2004 and similar legislation currently being introduced on a Europe-wide basis. In the future, electricity consumers will be provided with regular information on where and in which type of power station their electricity is generated. The article discusses how such a declaration may affect Swiss hydro-power stations and the changes in customer-perception that the power generation declaration will initiate

  10. Multi-objective Operation Chart Optimization for Aquatic Species Habitat Conservation of Cascaded Hydropower System on Yuan River, Southwestern China

    Science.gov (United States)

    Wen, X.; Lei, X.; Fang, G.; Huang, X.

    2017-12-01

    Extensive cascading hydropower exploitation in southwestern China has been the subject of debate and conflict in recent years. Introducing limited ecological curves, a novel approach for derivation of hydropower-ecological joint operation chart of cascaded hydropower system was proposed, aiming to optimize the general hydropower and ecological benefits, and to alleviate the ecological deterioration in specific flood/dry conditions. The physical habitat simulation model is proposed initially to simulate the relationship between streamflow and physical habitat of target fish species and to determine the optimal ecological flow range of representative reach. The ecological—hydropower joint optimization model is established to produce the multi-objective operation chart of cascaded hydropower system. Finally, the limited ecological guiding curves were generated and added into the operation chart. The JS-MDS cascaded hydropower system on the Yuan River in southwestern China is employed as the research area. As the result, the proposed guiding curves could increase the hydropower production amount by 1.72% and 5.99% and optimize ecological conservation degree by 0.27% and 1.13% for JS and MDS Reservoir, respectively. Meanwhile, the ecological deterioration rate also sees a decrease from 6.11% to 1.11% for JS Reservoir and 26.67% to 3.89% for MDS Reservoir.

  11. The Second Assessment of the Effects of Climate Change on Federal Hydropower

    Energy Technology Data Exchange (ETDEWEB)

    Kao, Shih-Chieh [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ashfaq, Moetasim [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Naz, Bibi S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Uria Martinez, Rocio [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Rastogi, Deeksha [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Mei, Rui [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Jager, Yetta [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Samu, Nicole M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sale, Michael J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-09-01

    relatively large storage capacity in the most of the US federal hydropower reservoirs, the system is likely to be able to absorb part of the runoff variability and hence may continue to provide stable annual hydropower generation in the projected near-term and midterm future periods. Nevertheless, the findings are based on the assumption that there is no significant change in the future installed capacity and operation. The issues of aging infrastructures, competing water demand, and environmental requirements may reduce the system s ability to mitigate runoff variability and increase the difficulty of future operation. These issues are not quantitatively analyzed in this study. This study presents a regional assessment at each of the eighteen PMA study areas. This generalized approach allows for spatial consistency throughout all study areas, enabling policymakers to evaluate potential climate change impacts across the entire federal hydropower fleet. This effort is expected to promote better understanding of the sensitivity of federal power plants to water availability and provides a basis for planning future actions that will enable adaptation to climate variability and change.

  12. Short-term memories with a stochastic perturbation

    International Nuclear Information System (INIS)

    Pontes, Jose C.A. de; Batista, Antonio M.; Viana, Ricardo L.; Lopes, Sergio R.

    2005-01-01

    We investigate short-term memories in linear and weakly nonlinear coupled map lattices with a periodic external input. We use locally coupled maps to present numerical results about short-term memory formation adding a stochastic perturbation in the maps and in the external input

  13. Short-term memory

    Science.gov (United States)

    Toulouse, G.

    This is a rather bold attempt to bridge the gap between neuron structure and psychological data. We try to answer the question: Is there a relation between the neuronal connectivity in the human cortex (around 5,000) and the short-term memory capacity (7±2)? Our starting point is the Hopfield model (Hopfield 1982), presented in this volume by D.J. Amit.

  14. Hydropower potential of the lower Vistula

    Directory of Open Access Journals (Sweden)

    Michał Szydłowski

    2015-03-01

    Full Text Available This paper presents an estimate analysis of the hydropower potential of the lower Vistula River from Warsaw to Gdańsk Bay. The calculations were made for a hydraulic model of the lower Vistula which takes into account potential development of barrages in a cascade system. Results obtained from the model simulations and from hydrological calculations were used to estimate the power of hydropower plants and the average annual energy output from the entire cascade system. The results of calculations indicate significant energy benefits resulting from the development of a cascade of hydropower plants in the lower Vistula. This study does not discuss the cascade project’s economic viability or other aspects of its development (inland waterways, flood control, etc..

  15. Private equity, public affair: Hydropower financing in the Mekong Basin

    NARCIS (Netherlands)

    Merme, V.; Ahlers, R.; Gupta, J.

    2014-01-01

    Large-scale hydropower development is increasingly popular. Although international finance is a significant driver of hydropower market expansion, financial data is relatively obscure and literature remains scarce. This article tracks the financial process in hydropower development in the Mekong

  16. Small hydropower station in Lavin - Preliminary study; Kleinwasserkraftwerk Lavin - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    Merz, F.

    2008-05-15

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) presents the results of a preliminary study regarding a proposed small hydropower installation on the alpine river Lavinuoz in Lavin, Switzerland. The geographical situation with mountains and glaciers in the catchment area of the proposed hydropower installation is discussed as are the appropriate water catchment installations. Possible dangers caused by avalanches and rock fall are examined. The power to be produced - 5,500,000 kWh/y - by the turbine which is nominally rated at 1350 kW is discussed, as are estimates of production costs. Figures on the investments required and the economic feasibility of the project are discussed, as are environmental factors that are to be taken into account.

  17. Competitive short-term and long-term memory processes in spatial habituation.

    Science.gov (United States)

    Sanderson, David J; Bannerman, David M

    2011-04-01

    Exposure to a spatial location leads to habituation of exploration such that, in a novelty preference test, rodents subsequently prefer exploring a novel location to the familiar location. According to Wagner's (1981) theory of memory, short-term and long-term habituation are caused by separate and sometimes opponent processes. In the present study, this dual-process account of memory was tested. Mice received a series of exposure training trials to a location before receiving a novelty preference test. The novelty preference was greater when tested after a short, rather than a long, interval. In contrast, the novelty preference was weaker when exposure training trials were separated by a short, rather than a long interval. Furthermore, it was found that long-term habituation was determined by the independent effects of the amount of exposure training and the number of exposure training trials when factors such as the intertrial interval and the cumulative intertrial interval were controlled. A final experiment demonstrated that a long-term reduction of exploration could be caused by a negative priming effect due to associations formed during exploration. These results provide evidence against a single-process account of habituation and suggest that spatial habituation is determined by both short-term, recency-based memory and long-term, incrementally strengthened memory.

  18. Retrieval-Induced Inhibition in Short-Term Memory.

    Science.gov (United States)

    Kang, Min-Suk; Choi, Joongrul

    2015-07-01

    We used a visual illusion called motion repulsion as a model system for investigating competition between two mental representations. Subjects were asked to remember two random-dot-motion displays presented in sequence and then to report the motion directions for each. Remembered motion directions were shifted away from the actual motion directions, an effect similar to the motion repulsion observed during perception. More important, the item retrieved second showed greater repulsion than the item retrieved first. This suggests that earlier retrieval exerted greater inhibition on the other item being held in short-term memory. This retrieval-induced motion repulsion could be explained neither by reduced cognitive resources for maintaining short-term memory nor by continued inhibition between short-term memory representations. These results indicate that retrieval of memory representations inhibits other representations in short-term memory. We discuss mechanisms of retrieval-induced inhibition and their implications for the structure of memory. © The Author(s) 2015.

  19. Evaluation of Short Term Memory Span Function In Children

    Directory of Open Access Journals (Sweden)

    Barış ERGÜL

    2016-12-01

    Full Text Available Although details of the information encoded in the short-term memory where it is stored temporarily be recorded in the working memory in the next stage. Repeating the information mentally makes it remain in memory for a long time. Studies investigating the relationship between short-term memory and reading skills that are carried out to examine the relationship between short-term memory processes and reading comprehension. In this study information coming to short-term memory and the factors affecting operation of short term memory are investigated with regression model. The aim of the research is to examine the factors (age, IQ and reading skills that are expected the have an effect on short-term memory in children through regression analysis. One of the assumptions of regression analysis is to examine which has constant variance and normal distribution of the error term. In this study, because the error term is not normally distributed, robust regression techniques were applied. Also, for each technique; coefficient of determination is determined. According to the findings, the increase in age, IQ and reading skills caused the increase in short term memory in children. After applying robust regression techniques, the Winsorized Least Squares (WLS technique gives the highest coefficient of determination.

  20. Evaluation of Short Term Memory Span Function In Children

    OpenAIRE

    Barış ERGÜL; Arzu ALTIN YAVUZ; Ebru GÜNDOĞAN AŞIK

    2016-01-01

    Although details of the information encoded in the short-term memory where it is stored temporarily be recorded in the working memory in the next stage. Repeating the information mentally makes it remain in memory for a long time. Studies investigating the relationship between short-term memory and reading skills that are carried out to examine the relationship between short-term memory processes and reading comprehension. In this study information coming to short-term memory and the factors ...

  1. Hydropower's Biogenic Carbon Footprint.

    Science.gov (United States)

    Scherer, Laura; Pfister, Stephan

    2016-01-01

    Global warming is accelerating and the world urgently needs a shift to clean and renewable energy. Hydropower is currently the largest renewable source of electricity, but its contribution to climate change mitigation is not yet fully understood. Hydroelectric reservoirs are a source of biogenic greenhouse gases and in individual cases can reach the same emission rates as thermal power plants. Little is known about the severity of their emissions at the global scale. Here we show that the carbon footprint of hydropower is far higher than previously assumed, with a global average of 173 kg CO2 and 2.95 kg CH4 emitted per MWh of electricity produced. This results in a combined average carbon footprint of 273 kg CO2e/MWh when using the global warming potential over a time horizon of 100 years (GWP100). Nonetheless, this is still below that of fossil energy sources without the use of carbon capture and sequestration technologies. We identified the dams most promising for capturing methane for use as alternative energy source. The spread among the ~1500 hydropower plants analysed in this study is large and highlights the importance of case-by-case examinations.

  2. Hydropower's Biogenic Carbon Footprint

    Science.gov (United States)

    Pfister, Stephan

    2016-01-01

    Global warming is accelerating and the world urgently needs a shift to clean and renewable energy. Hydropower is currently the largest renewable source of electricity, but its contribution to climate change mitigation is not yet fully understood. Hydroelectric reservoirs are a source of biogenic greenhouse gases and in individual cases can reach the same emission rates as thermal power plants. Little is known about the severity of their emissions at the global scale. Here we show that the carbon footprint of hydropower is far higher than previously assumed, with a global average of 173 kg CO2 and 2.95 kg CH4 emitted per MWh of electricity produced. This results in a combined average carbon footprint of 273 kg CO2e/MWh when using the global warming potential over a time horizon of 100 years (GWP100). Nonetheless, this is still below that of fossil energy sources without the use of carbon capture and sequestration technologies. We identified the dams most promising for capturing methane for use as alternative energy source. The spread among the ~1500 hydropower plants analysed in this study is large and highlights the importance of case-by-case examinations. PMID:27626943

  3. The water footprint of electricity from hydropower

    NARCIS (Netherlands)

    Mekonnen, Mesfin; Hoekstra, Arjen Ysbert

    Hydropower accounts for about 16% of the world’s electricity supply. Although dams often have big environmental and social impacts, proponents of hydropower regard it as a comparatively clean, low-cost and renewable form of energy. It has been debated whether hydroelectric generation is merely an

  4. Short-term Memory as a Processing Shift

    Science.gov (United States)

    Lewis-Smith, Marion Quinn

    1975-01-01

    The series of experiments described here examined the predictions for free recall from sequential models and the shift formulation, focusing on the roles of short- and long-term memory in the primacy/recency shift and on the effects of expectancies on short- and long-term memory. (Author/RK)

  5. Thayer Lake Hydropower Development -- Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Matousek, Mark [ORENCO Hydropower, Palo Alto, CA (United States)

    2017-06-30

    The Thayer Lake Hydropower Development (THLD) has been under study since the late 1970’s as Angoon explored opportunities to provide lower cost renewable power to the Community and avoid the high cost of diesel generation. Kootznoowoo Inc. (Kootznoowoo), the tribal corporation for Angoon’s current and past residents, was provided the rights by Congress to develop a hydropower project within the Admiralty Island National Monument. This grant (DE-EE0002504) by the Department of Energy’s (DOE’s) Office of Indian Energy and a matching grant from the Alaska Energy Authority (AEA) were provided to Kootznoowoo to enable the design, engineering and permitting of this hydropower project on Thayer Creek. Prior to the grant, the USFS had performed a final environmental impact statement (FEIS) and issued a Record of Decision (ROD) in 2009 for a 1.2 MW hydropower project on Thayer Creek that would Angoon’s needs with substantial excess capacity for growth. Kootznoowoo hired Alaska Power & Telephone (AP&T) in 2013 to manage this project and oversee its development. AP&T and its subcontractors under Kootznoowoo’s guidance performed several activities, aligned with the task plan defined in the grant.

  6. Project SHARE Sustainable Hydropower in Alpine Rivers Ecosystems

    Science.gov (United States)

    Mammoliti Mochet, Andrea

    2010-05-01

    SHARE - Sustainable Hydropower in Alpine Rivers Ecosystems is a running project early approved and co funded by the European regional development fund in the context of the European Territorial Cooperation Alpine Space programme 2007 - 2013: the project is formally ongoing from August 2009 and it will end July 2012. Hydropower is the most important renewable resource for electricity production in alpine areas: it has advantages for the global CO2 balance but creates serious environmental impacts. RES-e Directives require renewable electricity enhance but, at the same time, the Water Framework Directive obliges member States to reach or maintain a water bodies "good" ecological status, intrinsically limiting the hydropower exploitation. Administrators daily face an increasing demand of water abstraction but lack reliable tools to rigorously evaluate their effects on mountain rivers and the social and economical outputs on longer time scale. The project intends to develop, test and promote a decision support system to merge on an unprejudiced base, river ecosystems and hydropower requirements. This approach will be led using existing scientific tools, adjustable to transnational, national and local normative and carried on by permanent panel of administrators and stakeholders. Scientific knowledge related to HP & river management will be "translated" by the communication tools and spent as a concrete added value to build a decision support system. In particular, the Multicriteria Analysis (MCA) will be applied to assess different management alternatives where a single-criterion approach (such as cost-benefit analysis) falls short, especially where environmental, technical, economic and social criteria can't be quantified by monetary values. All the existing monitoring databases will be used and harmonized with new information collected during the Pilot case studies. At the same time, all information collected will be available to end users and actors of related

  7. Analysis on regulation strategies for extending service life of hydropower turbines

    Science.gov (United States)

    Yang, W.; Norrlund, P.; Yang, J.

    2016-11-01

    Since a few years, there has been a tendency that hydropower turbines experience fatigue to a greater extent, due to increasingly more regulation movements of governor actuators. The aim of this paper is to extend the service life of hydropower turbines, by reasonably decreasing the guide vane (GV) movements with appropriate regulation strategies, e.g. settings of PI (proportional-integral) governor parameters and controller filters. The accumulated distance and number of GV movements are the two main indicators of this study. The core method is to simulate the long-term GV opening of Francis turbines with MATLAB/Simulink, based on a sequence of one-month measurements of the Nordic grid frequency. Basic theoretical formulas are also discussed and compared to the simulation results, showing reasonable correspondence. Firstly, a model of a turbine governor is discussed and verified, based on on-site measurements of a Swedish hydropower plant. Then, the influence of governor parameters is discussed. Effects of different settings of controller filters (e.g. dead zone, floating dead zone and linear filter) are also examined. Moreover, a change in GV movement might affect the quality of the frequency control. This is also monitored via frequency deviation characteristics, determined by elementary simulations of the Nordic power system. The results show how the regulation settings affect the GV movements and frequency quality, supplying suggestions for optimizing the hydropower turbine operation for decreasing the wear and tear.

  8. On the relationship between short- and long-term memory

    DEFF Research Database (Denmark)

    Sørensen, Thomas Alrik

    James (1890) divided memory into separate stores; primary and secondary – or short-term and long-term memory. The interaction between the two stores often assumes that information initially is represented in volatile short-term store before entering and consolidating in the more durable long-term......, accepted). Counter to popular beliefs this suggest that long-term memory precedes short-term memory and not vice versa....... memory system (e.g. Atkinson & Shiffrin, 1968). Short-term memory seems to provide a surprising processing bottleneck where only a very limited amount of information can be represented at any given moment (Miller, 1956; Cowan, 2001). A number of studies have investigated the nature of this processing...

  9. Aggregation Methods for Modelling Hydropower and Its Implications for a Highly Decarbonised Energy System in Europe

    Directory of Open Access Journals (Sweden)

    Philipp Härtel

    2017-11-01

    Full Text Available Given the pursuit of long-term decarbonisation targets, future power systems face the task of integrating the renewable power and providing flexible backup production capacity. Due to its general ability to be dispatched, hydropower offers unique features and a backup production option not to be neglected, especially when taking the flexibility potential of multireservoir systems into account. Adequate hydropower representations are a necessity when analysing future power markets and aggregation methods are crucial for overcoming computational challenges. However, a major issue is that the aggregation must not be a too flexible representation. In a first step, a novel equivalent hydro system model implementation including a possibility to integrate pumping capacity and appropriate handling of multiple water paths (hydraulic coupling by making use of an ex-ante optimisation is proposed. In a second step, a clustered equivalent hydro system model implementation employing k-means clustering is presented. A comparison of both aggregation approaches against the detailed reference system shows that both aggregated model variants yield significant reductions in computation time while keeping an adequate level of accuracy for a highly decarbonised power system scenario in Europe. The aggregation methods can easily be applied in different model types and may also be helpful in the stochastic case.

  10. Short-term memory and long-term memory are still different.

    Science.gov (United States)

    Norris, Dennis

    2017-09-01

    A commonly expressed view is that short-term memory (STM) is nothing more than activated long-term memory. If true, this would overturn a central tenet of cognitive psychology-the idea that there are functionally and neurobiologically distinct short- and long-term stores. Here I present an updated case for a separation between short- and long-term stores, focusing on the computational demands placed on any STM system. STM must support memory for previously unencountered information, the storage of multiple tokens of the same type, and variable binding. None of these can be achieved simply by activating long-term memory. For example, even a simple sequence of digits such as "1, 3, 1" where there are 2 tokens of the digit "1" cannot be stored in the correct order simply by activating the representations of the digits "1" and "3" in LTM. I also review recent neuroimaging data that has been presented as evidence that STM is activated LTM and show that these data are exactly what one would expect to see based on a conventional 2-store view. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  11. Fast Weight Long Short-Term Memory

    OpenAIRE

    Keller, T. Anderson; Sridhar, Sharath Nittur; Wang, Xin

    2018-01-01

    Associative memory using fast weights is a short-term memory mechanism that substantially improves the memory capacity and time scale of recurrent neural networks (RNNs). As recent studies introduced fast weights only to regular RNNs, it is unknown whether fast weight memory is beneficial to gated RNNs. In this work, we report a significant synergy between long short-term memory (LSTM) networks and fast weight associative memories. We show that this combination, in learning associative retrie...

  12. Framing hydropower as green energy: assessing drivers, risks and tensions in the Eastern Himalayas

    Science.gov (United States)

    Ahlers, R.; Budds, J.; Joshi, D.; Merme, V.; Zwarteveen, M.

    2015-04-01

    The culturally and ecologically diverse region of the Eastern Himalayas is the target of ambitious hydropower development plans. Policy discourses at national and international levels position this development as synergistically positive: it combines the production of clean energy to fuel economic growth at regional and national levels with initiatives to lift poor mountain communities out of poverty. Different from hydropower development in the 20th century in which development agencies and banks were important players, contemporary initiatives importantly rely on the involvement of private actors, with a prominent role of the private finance sector. This implies that hydropower development is not only financially viable but also understood as highly profitable. This paper examines the new development of hydropower in the Eastern Himalayas of Nepal and India. It questions its framing as green energy, interrogates its links with climate change, and examines its potential for investment and capital accumulation. To do this, we also review the evidence on the extent to which its construction and operation may modify existing hydrogeological processes and ecosystems, as well as its impacts on the livelihoods of diverse groups of people that depend on these. The paper concludes that hydropower development in the region is characterized by inherent contentions and uncertainties, refuting the idea that dams constitute development projects whose impacts can be simply predicted, controlled and mitigated. Indeed, in a highly complex geological, ecological, cultural and political context that is widely regarded to be especially vulnerable to the effects of climate change, hydropower as a development strategy makes for a toxic cocktail.

  13. Concession rules for hydropower production without reference to ownership

    International Nuclear Information System (INIS)

    2002-01-01

    The report deals with the socio-economic consequences of various ways of changing the regulations defined in the industrial concession law about reversion of hydroelectric power plants. Currently only public Norwegian owners may be given concession unlimited in time, which makes a sort of lock-up effect. Discontinuation of reversion will remove the lock-up effect. On certain conditions this also applies to models based on reversion for all and option for the Government to implement reversion, and time limited concessions without reversion. All the alteration models may therefore lead to easier trading of Norwegian hydropower plants. The alteration models have different consequences for the total external conditions for the power sector

  14. Optimal Management for Waters for the Production of Electrical Energy

    African Journals Online (AJOL)

    The hydropower management along a short-term planning horizon is a determinist problem, which consists in determining the amount of water to be discharged from each reservoir of the system over the defined planning horizon so that to meet the hourly load demand assigned previously. The prime objective here is to ...

  15. Water Grabbing in the Mekong Basin – An Analysis of the Winners and Losers of Thailand’s Hydropower Development in Lao PDR

    Directory of Open Access Journals (Sweden)

    Nathanial Matthews

    2012-06-01

    The analysis shows that the structure and politics of the Thai electricity sector, private-sector profiteering and a strong domestic civil society are driving Thailand’s hydropower investment in neighbouring Laos. Thai investments are enabled by Laos’ weak enforcement of laws, a lack of capacity to regulate development, the existence of corruption and a tightly controlled state. These drivers and enabling factors combine with short-term economic focused regional development to create opportunities for water grabbing. The winners of this water grabbing are the powerful actors who control the benefits, while the losers, local livelihoods and the environment, are negatively impacted.

  16. Effects of long-term price increases for oil

    International Nuclear Information System (INIS)

    Voehringer, F.; Mueller, A.; Boehringer, C.

    2007-03-01

    This comprehensive report for the Swiss Federal Office of Energy (SFOE) takes a look at the effects of higher oil prices in the long-term. Scenarios examined include those with high oil prices of 80 to 140 dollars per barrel and those with drastic shortages resulting from peak extraction in the years 2010 and 2020. Long-term economic balances form the basis of the report, short-term influences and psychological effects are not addressed. The possible dangers for the earth's climate caused by the substitution of oil by coal-based products are discussed, as well as the sequestration of carbon dioxide. Ethanol and the associated conflicts of land use are examined and the decreasing cost-effectiveness of co-generation power generation is looked at. Alternatives such as atomic power, hydropower, solar energy, geothermal energy, biogas and wind power are discussed. The effect of the changing energy scene on economic growth and welfare aspects in Switzerland are examined. The authors conclude that high oil prices have considerable impacts on the economy and are not a substitute for an internationally co-ordinated climate policy

  17. Short-term power plant operation scheduling in thermal systems with long-term boundary conditions

    International Nuclear Information System (INIS)

    Wolter, H.

    1990-01-01

    For the first time, the modeling of long-term quantitative conditions within the short-term planning of the application of power stations is made via their shadow prices. It corresponds to a decomposition of the quantitative conditions by means of the method of the Langrange relaxation. The shadow prices determined by the planning for energy application regarding long- term quantitative conditions pass into the short-term planning for power station application and subsidize or rather punish the application of limited amounts as for as they are not claimed for sufficiently or excessively. The clear advantage of this modeling is that the short-term planning of power station application can deviate from the envisioned energy application regarding the total optimum, because the shadow prices contain all information about the cost effect of the energy shifts in the residual total period, which become necessary due to the deviations in the short-term period to be planned in the current short-term period. (orig./DG) [de

  18. Evaluating and optimizing the operation of the hydropower system in the Upper Yellow River: A general LINGO-based integrated framework

    Science.gov (United States)

    Si, Yuan; Liu, Ronghua; Wei, Jiahua; Huang, Yuefei; Li, Tiejian; Liu, Jiahong; Gu, Shenglong; Wang, Guangqian

    2018-01-01

    The hydropower system in the Upper Yellow River (UYR), one of the largest hydropower bases in China, plays a vital role in the energy structure of the Qinghai Power Grid. Due to management difficulties, there is still considerable room for improvement in the joint operation of this system. This paper presents a general LINGO-based integrated framework to study the operation of the UYR hydropower system. The framework is easy to use for operators with little experience in mathematical modeling, takes full advantage of LINGO’s capabilities (such as its solving capacity and multi-threading ability), and packs its three layers (the user layer, the coordination layer, and the base layer) together into an integrated solution that is robust and efficient and represents an effective tool for data/scenario management and analysis. The framework is general and can be easily transferred to other hydropower systems with minimal effort, and it can be extended as the base layer is enriched. The multi-objective model that represents the trade-off between power quantity (i.e., maximum energy production) and power reliability (i.e., firm output) of hydropower operation has been formulated. With equivalent transformations, the optimization problem can be solved by the nonlinear programming (NLP) solvers embedded in the LINGO software, such as the General Solver, the Multi-start Solver, and the Global Solver. Both simulation and optimization are performed to verify the model’s accuracy and to evaluate the operation of the UYR hydropower system. A total of 13 hydropower plants currently in operation are involved, including two pivotal storage reservoirs on the Yellow River, which are the Longyangxia Reservoir and the Liujiaxia Reservoir. Historical hydrological data from multiple years (2000–2010) are provided as input to the model for analysis. The results are as follows. 1) Assuming that the reservoirs are all in operation (in fact, some reservoirs were not operational or did

  19. Evaluating and optimizing the operation of the hydropower system in the Upper Yellow River: A general LINGO-based integrated framework.

    Directory of Open Access Journals (Sweden)

    Yuan Si

    Full Text Available The hydropower system in the Upper Yellow River (UYR, one of the largest hydropower bases in China, plays a vital role in the energy structure of the Qinghai Power Grid. Due to management difficulties, there is still considerable room for improvement in the joint operation of this system. This paper presents a general LINGO-based integrated framework to study the operation of the UYR hydropower system. The framework is easy to use for operators with little experience in mathematical modeling, takes full advantage of LINGO's capabilities (such as its solving capacity and multi-threading ability, and packs its three layers (the user layer, the coordination layer, and the base layer together into an integrated solution that is robust and efficient and represents an effective tool for data/scenario management and analysis. The framework is general and can be easily transferred to other hydropower systems with minimal effort, and it can be extended as the base layer is enriched. The multi-objective model that represents the trade-off between power quantity (i.e., maximum energy production and power reliability (i.e., firm output of hydropower operation has been formulated. With equivalent transformations, the optimization problem can be solved by the nonlinear programming (NLP solvers embedded in the LINGO software, such as the General Solver, the Multi-start Solver, and the Global Solver. Both simulation and optimization are performed to verify the model's accuracy and to evaluate the operation of the UYR hydropower system. A total of 13 hydropower plants currently in operation are involved, including two pivotal storage reservoirs on the Yellow River, which are the Longyangxia Reservoir and the Liujiaxia Reservoir. Historical hydrological data from multiple years (2000-2010 are provided as input to the model for analysis. The results are as follows. 1 Assuming that the reservoirs are all in operation (in fact, some reservoirs were not operational

  20. Improving creativity performance by short-term meditation

    Science.gov (United States)

    2014-01-01

    Background One form of meditation intervention, the integrative body-mind training (IBMT) has been shown to improve attention, reduce stress and change self-reports of mood. In this paper we examine whether short-term IBMT can improve performance related to creativity and determine the role that mood may play in such improvement. Methods Forty Chinese undergraduates were randomly assigned to short-term IBMT group or a relaxation training (RT) control group. Mood and creativity performance were assessed by the Positive and Negative Affect Schedule (PANAS) and Torrance Tests of Creative Thinking (TTCT) questionnaire respectively. Results As predicted, the results indicated that short-term (30 min per day for 7 days) IBMT improved creativity performance on the divergent thinking task, and yielded better emotional regulation than RT. In addition, cross-lagged analysis indicated that both positive and negative affect may influence creativity in IBMT group (not RT group). Conclusions Our results suggested that emotion-related creativity-promoting mechanism may be attributed to short-term meditation. PMID:24645871

  1. Low-head hydropower assessment of the Brazilian State of São Paulo

    Science.gov (United States)

    Artan, Guleid A.; Cushing, W. Matthew; Mathis, Melissa L.; Tieszen, Larry L.

    2014-01-01

    This study produced a comprehensive estimate of the magnitude of hydropower potential available in the streams that drain watersheds entirely within the State of São Paulo, Brazil. Because a large part of the contributing area is outside of São Paulo, the main stem of the Paraná River was excluded from the assessment. Potential head drops were calculated from the Digital Terrain Elevation Data,which has a 1-arc-second resolution (approximately 30-meter resolution at the equator). For the conditioning and validation of synthetic stream channels derived from the Digital Elevation Model datasets, hydrography data (in digital format) supplied by the São Paulo State Department of Energy and the Agência Nacional de Águas were used. Within the study area there were 1,424 rain gages and 123 streamgages with long-term data records. To estimate average yearly streamflow, a hydrologic regionalization system that divides the State into 21 homogeneous basins was used. Stream segments, upstream areas, and mean annual rainfall were estimated using geographic information systems techniques. The accuracy of the flows estimated with the regionalization models was validated. Overall, simulated streamflows were significantly correlated with the observed flows but with a consistent underestimation bias. When the annual mean flows from the regionalization models were adjusted upward by 10 percent, average streamflow estimation bias was reduced from -13 percent to -4 percent. The sum of all the validated stream reach mean annual hydropower potentials in the 21 basins is 7,000 megawatts (MW). Hydropower potential is mainly concentrated near the Serra do Mar mountain range and along the Tietê River. The power potential along the Tietê River is mainly at sites with medium and high potentials, sites where hydropower has already been harnessed. In addition to the annual mean hydropower estimates, potential hydropower estimates with flow rates with exceedance probabilities of 40

  2. Short-term effects of recombinant human growth hormone and feeding on gluconeogenesis in humans

    Science.gov (United States)

    After a short-term fast, lactating women have increased rates of glucose production but not gluconeogenesis (GNG) despite relative hypoinsulinemia. We explored the effects of non-insulin-dependent increase in glucose utilization and recombinant human growth hormone (rhGH) on glucose production, glyc...

  3. The Structure and Content of Long-Term and Short-Term Mate Preferences

    Directory of Open Access Journals (Sweden)

    Peter K. Jonason

    2013-12-01

    Full Text Available This study addresses two limitations in the mate preferences literature. First, research all-too-often relies on single-item assessments of mate preferences precluding more advanced statistical techniques like factor analysis. Second, when factor analysis could be done, it exclusively has done for long-term mate preferences, at the exclusion of short-term mate preferences. In this study (N = 401, we subjected 20 items designed to measure short- and long-term mate preferences to both principle components (n = 200 and confirmatory factor analysis (n = 201. In the long-term context, we replicated previous findings that there are three different categories of preferences: physical attractiveness, interpersonal warmth, and social status. In the short-term context, physical attractiveness occupied two parts of the structure, social status dropped out, and interpersonal warmth remained. Across short- and long-term contexts, there were slight changes in what defined the shared dimensions (i.e., physical attractiveness and interpersonal warmth, suggesting prior work that applies the same inventory to each context might be flawed. We also replicated sex differences and similarities in mate preferences and correlates with sociosexuality and mate value. We adopt an evolutionary paradigm to understand our results.

  4. Optimizing Wind And Hydropower Generation Within Realistic Reservoir Operating Policy

    Science.gov (United States)

    Magee, T. M.; Clement, M. A.; Zagona, E. A.

    2012-12-01

    Previous studies have evaluated the benefits of utilizing the flexibility of hydropower systems to balance the variability and uncertainty of wind generation. However, previous hydropower and wind coordination studies have simplified non-power constraints on reservoir systems. For example, some studies have only included hydropower constraints on minimum and maximum storage volumes and minimum and maximum plant discharges. The methodology presented here utilizes the pre-emptive linear goal programming optimization solver in RiverWare to model hydropower operations with a set of prioritized policy constraints and objectives based on realistic policies that govern the operation of actual hydropower systems, including licensing constraints, environmental constraints, water management and power objectives. This approach accounts for the fact that not all policy constraints are of equal importance. For example target environmental flow levels may not be satisfied if it would require violating license minimum or maximum storages (pool elevations), but environmental flow constraints will be satisfied before optimizing power generation. Additionally, this work not only models the economic value of energy from the combined hydropower and wind system, it also captures the economic value of ancillary services provided by the hydropower resources. It is recognized that the increased variability and uncertainty inherent with increased wind penetration levels requires an increase in ancillary services. In regions with liberalized markets for ancillary services, a significant portion of hydropower revenue can result from providing ancillary services. Thus, ancillary services should be accounted for when determining the total value of a hydropower system integrated with wind generation. This research shows that the end value of integrated hydropower and wind generation is dependent on a number of factors that can vary by location. Wind factors include wind penetration level

  5. Short-term energy outlook, annual supplement 1994

    International Nuclear Information System (INIS)

    1994-08-01

    The Short-Term Energy Outlook Annual Supplement (Supplement) is published once a year as a complement to the Short-Term Energy Outlook (Outlook), Quarterly Projections. The purpose of the Supplement is to review the accuracy of the forecasts published in the Outlook, make comparisons with other independent energy forecasts, and examine current energy topics that affect the forecasts

  6. Short-term energy outlook annual supplement, 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-08-06

    The Short-Term Energy Outlook Annual Supplement (supplement) is published once a year as a complement to the Short-Term Energy Outlook (Outlook), Quarterly Projections. The purpose of the Supplement is to review the accuracy of the forecasts published in the Outlook, make comparisons with other independent energy forecasts, and examine current energy topics that affect the forecasts.

  7. Assessment of risks due to climate change for the Upper Tamakoshi Hydropower Project in Nepal

    Directory of Open Access Journals (Sweden)

    Sangam Shrestha

    2016-01-01

    Full Text Available Climate change poses significant challenges to hydropower development and management in mountainous basins. This study examined the impact of climate change, and the associated risks, on the energy production of the Upper Tamakoshi Hydropower Project, which is located in the Tamakoshi basin of Nepal. The outputs of three GCMs—namely MIROC-ESM, MRI-CGCM3, and MPI-ESM-M—under the Representative Concentration Pathways (RCP scenarios were used for the projection of precipitation and temperature in the future. The minimum and maximum temperatures of the basin are projected to increase by 6.33 °C and 3.82 °C, respectively, by 2100. The projected precipitation varies from −8% to +24.8%, which is expected to alter the streamflow by −37.83% to +47% in the future. Based on the streamflow output, the risk for energy production was calculated with respect to the baseline energy production of 1963 GW h and 2281 GW h. Using the three GCMs, the risk associated with annual hydropower production under altered runoff was analyzed. The risk percentage in the future periods shows a mild risk varying from 0.69% to 6.63%. MPI-ESM-M GCM projects a higher percentage of risk for energy production during the same future periods, as compared to the baseline energy production of 1963 GW h. A mild to moderate risk, ranging from 2.73% to 13.24% can be expected when energy production in the future is compared to the baseline energy production of 2281 GW h.

  8. Hydro-power production and fish habitat suitability: Assessing impact and effectiveness of ecological flows at regional scale

    Science.gov (United States)

    Ceola, Serena; Pugliese, Alessio; Ventura, Matteo; Galeati, Giorgio; Montanari, Alberto; Castellarin, Attilio

    2018-06-01

    Anthropogenic activities along streams and rivers may be of major concern for fluvial ecosystems, e.g. abstraction and impoundment of surface water resources may profoundly alter natural streamflow regimes. An established approach aimed at preserving the behavior and distribution of fluvial species relies on the definition of ecological flows (e-flows) downstream of dams and diversion structures. E-flow prescriptions are usually set by basin authorities at regional scale, often without a proper assessment of their impact and effectiveness. On the contrary, we argue that e-flows should be identified on the basis of (i) regional and (ii) quantitative assessments. We focus on central Italy and evaluate the effects on habitat suitability of two near-threatened fish species (i.e. Barbel and Chub) and an existing hydro-power network when shifting from the current time-invariant e-flow policy to a tighter and seasonally-varying soon-to-be-enforced one. Our example clearly shows that: (a) quantitative regional scale assessments are viable even when streamflow observations are entirely missing at study sites; (b) aprioristic e-flows policies may impose releases that exceed natural streamflows for significantly long time intervals (weeks, or months); (c) unduly tightening e-flow policies may heavily impact regional hydro-power productivity (15% and 42% losses on annual and seasonal basis, respectively), yet resulting in either marginal or negligible improvements of fluvial ecosystem.

  9. The Office of Hydropower North-Rhine Westphalia; Das Buero fuer Wasserkraft NRW. Moderator zwischen Klimaschutz und Gewaesserschutz

    Energy Technology Data Exchange (ETDEWEB)

    Prott, Stefan [EnergieAgentur.NRW, Bad Sassendorf (Germany). Buero fuer Wasserkraft

    2011-07-01

    The energy state of North-Rhine Westphalia (NRW) is one of the most modern and important energy regions in the world and the use of hydroelectric power has a long tradition. It contributes both to the supply of electrical energy and to climate protection. The technically usable potential of hydroelectric power is currently estimated in NRW at 800 GWh/a electricity, of which approx. 200 GWh/a has not been exploited to date. The Office for Hydroelectric Power was created within the framework of the EnergyAgency.NRW in 2001. Its functions include the networking of information and available facilities, as well as the establishment of short lines of communication between specialists from water authorities, environmental and nature conservation associations, fisheries and angling clubs and the operators of hydroelectric power plants. It is often faced with the task of moderation to transparency and acceptance of a sustainable use of hydropower to contribute. Against the backdrop of the EC Water Resources Framework Directive, NRW is engaged in expanding hydropower in a way that is harmless to the ecology of waterways, and to do this by reactivating and optimizing active hydropower plants and by using hydropower technology at existing dams and infrastructural facilities. (orig.)

  10. Electricity production of Slovakia

    International Nuclear Information System (INIS)

    Czodor, T.

    2003-01-01

    Here is examined the spatial structure of electric energy production divided in hydropower plants (through-flow and re-pumping), thermal power plants as the most expensive way of electric energy production and nuclear power plants where high difficulty and long-term realisation of construction projects and spent financial resources are pointed out. Work describes present structure of electric energy production and consumption and refers to alternative electric energy sources

  11. Short Term Gain, Long Term Pain:Informal Job Search Methods and Post-Displacement Outcomes

    OpenAIRE

    Green, Colin

    2012-01-01

    This paper examines the role of informal job search methods on the labour market outcomes of displaced workers. Informal job search methods could alleviate short-term labour market difficulties of displaced workers by providing information on job opportunities, allowing them to signal their productivity and may mitigate wage losses through better post-displacement job matching. However if displacement results from reductions in demand for specific sectors/skills, the use of informal job searc...

  12. Production and ecological aspects of short rotation poplars in Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Karacic, Almir

    2005-02-01

    Poplars (Populus sp.) are widely used in short rotation forestry for production of biomass for bioenergy, fibre and environmental services. Swedish short rotation forestry is based on Salix sp., and little is known about the production potential of poplar plantations and their effects on the environment. This thesis focuses on four aspects of intensive short rotation forestry with poplars: 1) Biomass production and partitioning at several initial densities and a range of latitudes and growing conditions in Sweden, 2) the effects of poplar plantation on floristic diversity in the Swedish agricultural landscape, 3) the pattern of wind damage and its effects on production in poplar plantations in southern Sweden, and 4) ecological characterisation of poplar varieties in short-term experiments with pot-grown plants. Annual biomass production in poplar plots and plantations over a rotation period of 9-14 years ranges between 3.3 and 9.2 Mg/ha/yr. These high production figures are achieved on relatively fertile, non-fertilised and non-irrigated agricultural land. The production assessments for commercial poplar plantations established at lower initial densities (1000 trees/ha) in southern Sweden indicate a similar production potential as in closely spaced cultures (5000 trees/ha), though at 3-5 years longer rotations. Lower initial densities enable higher pulpwood yields along with the production of biomass for bioenergy. A comparison among 21 poplar plots, 0.1-13 ha large and adjacent arable fields, indicates that small poplar plantations may increase floristic diversity on a landscape scale, mainly by providing a different type of habitat that may favour shade-tolerant and draught-sensitive species. This is reflected by a relatively low number of species shared by both types of habitat. Wind damage in two poplar plantations, 15 and 33 ha large, was assessed using wind damage classes based on leaning angle of individual trees on plots established before wind damage

  13. Short-term energy outlook, January 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-01-01

    The Energy Information Administration (EIA) prepares the Short-Term Energy Outlook (energy supply, demand, and price projections) monthly. The forecast period for this issue of the Outlook extends from January 1999 through December 2000. Data values for the fourth quarter 1998, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the January 1999 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 28 figs., 19 tabs.

  14. Assessment of small versus large hydro-power developments - a Norwegian case study

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Tor Haakon; Harby, Atle

    2010-07-01

    Full text: The era of new, large hydro-power development projects seems to be over in Norway. Partly as a response to this, a large number of applications for the development of smallscale hydro power projects up to 10 MW overflow the Water Resources and Energy Directorate, resulting in an extensive development of small tributaries and water courses in Norway. This study has developed a framework for the assessment and comparison of several small versus many large hydro-power projects based on a multi-criteria analysis (MCA) approach, and further tested this approach on planned or developed projects in the Helgeland region, Norway. Multi-criteria analysis is a decision-support tool aimed at providing a systematic approach for the comparison of various alternatives with often non-commensurable and conflicting attributes. At the same time, the technique enables complex problems and various alternatives to be assessed in a transparent and simple way. The MCA-software was in our case equipped with 2 overall criteria (objectives) with a number of sub criteria; Production with sub-criteria like volume of energy production, installed effect, storage capacity and economical profit; Environmental impacts with sub-criteria like fishing interests, biodiversity, protection of unexploited nature The data used in the case study is based on the planned development of Vefsna (large project) with the energy/effect production estimated and the environmental impacts identified as part of the feasibility studies (the project never reached the authorities' licensing system with a formal EIA). The small-scale hydro-power projects used for comparison are based on realized projects in the Helgeland region and a number of proposed projects, up scaled to the size of the proposed Vefsna-development. The results from the study indicate that a large number of small-scale hydro-power projects need to be implemented in order to balance the volume of produced electricity/effect from one

  15. In Search of Decay in Verbal Short-Term Memory

    Science.gov (United States)

    Berman, Marc G.; Jonides, John; Lewis, Richard L.

    2009-01-01

    Is forgetting in the short term due to decay with the mere passage of time, interference from other memoranda, or both? Past research on short-term memory has revealed some evidence for decay and a plethora of evidence showing that short-term memory is worsened by interference. However, none of these studies has directly contrasted decay and…

  16. PREDICTION OF TOTAL DISSOLVED GAS EXCHANGE AT HYDROPOWER DAMS

    Energy Technology Data Exchange (ETDEWEB)

    Hadjerioua, Boualem [ORNL; Pasha, MD Fayzul K [ORNL; Stewart, Kevin M [ORNL; Bender, Merlynn [Bureau of Reclamation; Schneider, Michael L. [U.S. Army Corps of Engineers

    2012-07-01

    Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained by state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and

  17. Attention Problems, Phonological Short-Term Memory, and Visuospatial Short-Term Memory: Differential Effects on Near- and Long-Term Scholastic Achievement

    Science.gov (United States)

    Sarver, Dustin E.; Rapport, Mark D.; Kofler, Michael J.; Scanlan, Sean W.; Raiker, Joseph S.; Altro, Thomas A.; Bolden, Jennifer

    2012-01-01

    The current study examined individual differences in children's phonological and visuospatial short-term memory as potential mediators of the relationship among attention problems and near- and long-term scholastic achievement. Nested structural equation models revealed that teacher-reported attention problems were associated negatively with…

  18. Incorporating socio-environmental considerations into project assessment models using multi-criteria analysis: A case study of Sri Lankan hydropower projects

    International Nuclear Information System (INIS)

    Morimoto, Risako

    2013-01-01

    Before commissioning any energy projects, conducting robust assessments of different options in terms of their economic and socio-environmental impacts is important for successful project implementation. Yet, there is currently a lack of tools that simultaneously assess sustainability impacts; instead, they are often investigated separately, which gives decision makers somehow disintegrated information. Thus the main objective of this study is to examine how to incorporate socio-environmental considerations into project assessment models. The multi-criteria analysis is applied to the case study of Sri Lankan hydropower projects as an illustrative example. The estimated quantitative relationship between economic, environmental and social impacts of hydropower development is presented in this study. Such estimation, using sustainability indicators of hydropower projects, enables us to understand marginal trade-offs among economic, environmental and social objectives of hydropower development. Hence, this would provide an overview of potential impacts of different scenarios that are designed to be implemented and indicate an optimum mix of hydropower generation. - Highlights: • This study provides an effective hydropower project evaluation method using the MCA. • The proposed tool shows the quantitative relationship explicitly. • Marginal trade-offs between sustainability objectives are presented

  19. Short-Term Reciprocity in Late Parent-Child Relationships

    Science.gov (United States)

    Leopold, Thomas; Raab, Marcel

    2011-01-01

    Long-term concepts of parent-child reciprocity assume that the amount of support given and received is only balanced in a generalized fashion over the life course. We argue that reciprocity in parent-child relationships also operates in the short term. Our analysis of short-term reciprocity focuses on concurrent exchange in its main upward and…

  20. Implementing a short-term loyalty program : case: Bosch Lawn & Garden and the Ventum short-term loyalty program

    OpenAIRE

    Logvinova, Veronika

    2015-01-01

    In 2015, one of the Bosch Home and Garden divisions, Bosch Lawn and Garden, has made a strategic decision to adopt a points-based short-term loyalty program called Ventum LG in the German supermarkets and petrol stations. It was decided that the base of this program will be completed Ventum PT short-term loyalty program which was managed by another division, Bosch Power Tools, and proved to be successful. This thesis aims to evaluate the worthiness of the Ventum LG loyalty program for Bosch L...

  1. Hydropower Regulatory and Permitting Information Desktop (RAPID) Toolkit

    Energy Technology Data Exchange (ETDEWEB)

    Levine, Aaron L [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-12-19

    Hydropower Regulatory and Permitting Information Desktop (RAPID) Toolkit presentation from the WPTO FY14-FY16 Peer Review. The toolkit is aimed at regulatory agencies, consultants, project developers, the public, and any other party interested in learning more about the hydropower regulatory process.

  2. Decay uncovered in nonverbal short-term memory.

    Science.gov (United States)

    Mercer, Tom; McKeown, Denis

    2014-02-01

    Decay theory posits that memory traces gradually fade away over the passage of time unless they are actively rehearsed. Much recent work exploring verbal short-term memory has challenged this theory, but there does appear to be evidence for trace decay in nonverbal auditory short-term memory. Numerous discrimination studies have reported a performance decline as the interval separating two tones is increased, consistent with a decay process. However, most of this tone comparison research can be explained in other ways, without reference to decay, and these alternative accounts were tested in the present study. In Experiment 1, signals were employed toward the end of extended retention intervals to ensure that listeners were alert to the presence and frequency content of the memoranda. In Experiment 2, a mask stimulus was employed in an attempt to distinguish between a highly detailed sensory trace and a longer-lasting short-term memory, and the distinctiveness of the stimuli was varied. Despite these precautions, slow-acting trace decay was observed. It therefore appears that the mere passage of time can lead to forgetting in some forms of short-term memory.

  3. Short-term energy outlook annual supplement, 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the third quarter of 1993 through the fourth quarter of 1994. Values for the second quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding

  4. Chances of short-term cooling trends over Canada for the next decades

    Science.gov (United States)

    Grenier, Patrick; de Elia, Ramon; Chaumont, Diane

    2014-05-01

    As climate services continue to develop in Quebec, Canada, an increasing number of requests are made for providing information relevant for the near term. As a response, one approach has been to consider short-term cooling trends as a basis for climate products. This project comprises different aspects: technical steps, knowledge transfer, and societal use. Each step does represent a different challenge. The technical part, i.e. producing probabilistic distributions of short-term temperature trends, involves relatively complex scenario construction methods including bias-related post-processing, and access to wide simulation and observation databases. Calculations are performed on 60 CMIP5-based scenarios on a grid covering Canada during the period 2006-2035, and for 5, 10, 15, 20 and 25-year trend durations. Knowledge transfer implies overcoming misinterpretation, given that probabilistic projections based on simulation ensembles are not perfectly related to real-Earth possible outcomes. Finally, societal use of this information remains the biggest challenge. On the one hand, users clearly state their interest in near-term relevant information, and intuitively it seems clear that short-term cooling trends embedded within the long-term warming path should be considered in adaptation plans, for avoiding over-adaptation. On the other hand, the exact way of incorporating such information within a decision-making process has proven not to be obvious. Irrespective of that, the study and communication of short-term cooling chances is necessary for preventing decision-makers to infer from the eventual occurrence of such a trend that global warming isn't happening. The presentation will discuss the three aspects aforementioned.

  5. Small hydropower station in Schluein, Switzerland

    International Nuclear Information System (INIS)

    Merz, F.; Thoeny, F.

    2007-04-01

    This preliminary study elaborated for the Swiss Federal Office of Energy (SFOE) describes a project concerning the building of a small-scale hydropower installation in Schluein in the Grisons, Switzerland. The requirements placed on the water intake point in this mountainous region are discussed. The installation includes a 1230 metre long pressurised conduit and uses a multi-jet Pelton turbine to provide 720 kW of electrical power, the hydraulic head amounting to 140 m. The paper discusses the amounts of water available over the year, production costs and the economic feasibility of the project. The power production is estimated to 3,150,000 kWh/y. Environmental aspects are examined and details still to be defined are briefly mentioned.

  6. Frequency Stability of Hierarchically Controlled Hybrid Photovoltaic-Battery-Hydropower Microgrids

    DEFF Research Database (Denmark)

    Guan, Yajuan; Quintero, Juan Carlos Vasquez; Guerrero, Josep M.

    2015-01-01

    -based local grid is supplied. In this case, the PV-battery system will operate as a PQ bus to inject the desired active and reactive powers to local grid, while the hydropower station will act as a slack bus which maintains its voltage amplitude and frequency. An integrated small-signal state-space model......, a hierarchical controller for hybrid PV-battery-hydropower microgrid is proposed in order to achieve the parallel operation of hydropower and PV-battery system with different rates, and to guarantee power sharing performance among PV voltage controlled inverters, while the required power to hydropower...

  7. Fuzzy multiobjective models for optimal operation of a hydropower system

    Science.gov (United States)

    Teegavarapu, Ramesh S. V.; Ferreira, André R.; Simonovic, Slobodan P.

    2013-06-01

    Optimal operation models for a hydropower system using new fuzzy multiobjective mathematical programming models are developed and evaluated in this study. The models use (i) mixed integer nonlinear programming (MINLP) with binary variables and (ii) integrate a new turbine unit commitment formulation along with water quality constraints used for evaluation of reservoir downstream impairment. Reardon method used in solution of genetic algorithm optimization problems forms the basis for development of a new fuzzy multiobjective hydropower system optimization model with creation of Reardon type fuzzy membership functions. The models are applied to a real-life hydropower reservoir system in Brazil. Genetic Algorithms (GAs) are used to (i) solve the optimization formulations to avoid computational intractability and combinatorial problems associated with binary variables in unit commitment, (ii) efficiently address Reardon method formulations, and (iii) deal with local optimal solutions obtained from the use of traditional gradient-based solvers. Decision maker's preferences are incorporated within fuzzy mathematical programming formulations to obtain compromise operating rules for a multiobjective reservoir operation problem dominated by conflicting goals of energy production, water quality and conservation releases. Results provide insight into compromise operation rules obtained using the new Reardon fuzzy multiobjective optimization framework and confirm its applicability to a variety of multiobjective water resources problems.

  8. Modelling the feasibility of retrofitting hydropower to existing South ...

    African Journals Online (AJOL)

    sources (including nuclear energy) will be nearly 30% (Eskom,. 2011). South Africa ... Hydropower has the following advantages over other forms of .... well as negative environmental impacts. ... Potential environmental impacts of hydropower.

  9. Persistent and transient cost efficiency—an application to the Swiss hydropower sector

    International Nuclear Information System (INIS)

    Filippini, Massimo; University of Lugano; Geissmann, Thomas; Massachusetts Institute of Technology; Greene, William H.

    2017-01-01

    Electricity prices on the European market have decreased significantly over the past few years, resulting in a deterioration of Swiss hydropower firms’ competitiveness and profitability. One option to improve the sector’s competitiveness is to increase cost efficiency. The goal of this study is to quantify the level of persistent and transient cost efficiency of individual firms by applying the generalized true random effects (GTRE) model introduced by Colombi et al. (Journal of Productivity Analysis 42(2): 123–136, 2014) and Filippini and Greene (Journal of Productivity Analysis 45(2): 187–196, 2016). Applying this newly developed GTRE model to a total cost function, the level of cost efficiency of 65 Swiss hydropower firms is analyzed for the period between 2000 and 2013. A true random effects specification is estimated as a benchmark for the transient level of cost efficiency. The results show the presence of both transient as well as persistent cost inefficiencies. The GTREM predicts the aggregate level of cost inefficiency to amount to 21.8% (8.0% transient, 13.8% persistent) on average between 2000 and 2013. These two components differ in interpretation and implication. From an individual firm’s perspective, the two types of cost inefficiencies might require a firm’s management to respond with different improvement strategies. The existing level of persistent inefficiency could prevent the hydropower firms from adjusting their production processes to new market environments. From a regulatory point of view, the results of this study could be used in the scope and determination of the amount of financial support given to struggling firms.

  10. Demonstrating a new framework for the comparison of environmental impacts from small- and large-scale hydropower and wind power projects.

    Science.gov (United States)

    Bakken, Tor Haakon; Aase, Anne Guri; Hagen, Dagmar; Sundt, Håkon; Barton, David N; Lujala, Päivi

    2014-07-01

    Climate change and the needed reductions in the use of fossil fuels call for the development of renewable energy sources. However, renewable energy production, such as hydropower (both small- and large-scale) and wind power have adverse impacts on the local environment by causing reductions in biodiversity and loss of habitats and species. This paper compares the environmental impacts of many small-scale hydropower plants with a few large-scale hydropower projects and one wind power farm, based on the same set of environmental parameters; land occupation, reduction in wilderness areas (INON), visibility and impacts on red-listed species. Our basis for comparison was similar energy volumes produced, without considering the quality of the energy services provided. The results show that small-scale hydropower performs less favourably in all parameters except land occupation. The land occupation of large hydropower and wind power is in the range of 45-50 m(2)/MWh, which is more than two times larger than the small-scale hydropower, where the large land occupation for large hydropower is explained by the extent of the reservoirs. On all the three other parameters small-scale hydropower performs more than two times worse than both large hydropower and wind power. Wind power compares similarly to large-scale hydropower regarding land occupation, much better on the reduction in INON areas, and in the same range regarding red-listed species. Our results demonstrate that the selected four parameters provide a basis for further development of a fair and consistent comparison of impacts between the analysed renewable technologies. Copyright © 2014 The Authors. Published by Elsevier Ltd.. All rights reserved.

  11. Areas of Left Perisylvian Cortex Mediate Auditory-Verbal Short-Term Memory

    Science.gov (United States)

    Koenigs, Michael; Acheson, Daniel J.; Barbey, Aron K.; Solomon, Jeffrey; Postle, Bradley R.; Grafman, Jordan

    2011-01-01

    A contentious issue in memory research is whether verbal short-term memory (STM) depends on a neural system specifically dedicated to the temporary maintenance of information, or instead relies on the same brain areas subserving the comprehension and production of language. In this study, we examined a large sample of adults with acquired brain…

  12. Exploring current and projected tradeoffs between hydropower profitability and reliability of supply in the Alps

    Science.gov (United States)

    Anghileri, D.; Castelletti, A.; Burlando, P.

    2015-12-01

    The recent spreading of renewable energy across Europe and the associated production variability and uncertainty are emerging challenges for hydropower system operation. Widely distributed and highly intermittent solar and wind power generation systems, along with feed-in-tariffs, at which they are remunerated, are threating the operation of traditional hydropower systems. For instance, in countries where the transition to a larger production by means of renewable power systems is a novel process, e.g. Switzerland, many hydropower companies are operating their reservoirs with low or no profits, claiming for a revision of the entire energy market system. This situation goes along with the problem of ensuring energy supply both nowadays and in the future, with changing energy demand and available water resources. In this work, we focus on a hydropower system in the Swiss Alps to explore how different operating policies can cope with both adequate energy supply and profitable operation under current and future climate and socio-economic conditions. We investigate the operation of the Mattmark reservoir in South-West Switzerland. Mattmark is a pumped reservoir of 98 106 m3 fed by a natural catchment of 37 km2 and contributing catchments, summing up to 51 km2, connected by several diversion channels. The hydrological regime, snow- and ice-melt dominated, has already experienced changes in the last decades due to glacier retreat and is expected to be strongly impacted by climate change in the future. We use Multi-Objective optimization techniques to explore current tradeoffs between profitability and secure supply. We then investigate how tradeoffs may evolve in time under different climate change projections and energy market scenarios. Results inform on the co-evolution of climate- and socio-economic induced variations, thus unveiling potential co-benefit situations to hydropower generation and providing insights to future energy market design.

  13. Optimal Operation of Hydropower Reservoirs under Climate Change: The Case of Tekeze Reservoir, Eastern Nile

    Directory of Open Access Journals (Sweden)

    Fikru Fentaw Abera

    2018-03-01

    Full Text Available Optimal operation of reservoirs is very essential for water resource planning and management, but it is very challenging and complicated when dealing with climate change impacts. The objective of this paper was to assess existing and future hydropower operation at the Tekeze reservoir in the face of climate change. In this study, a calibrated and validated Soil and Water Assessment Tool (SWAT was used to model runoff inflow into the Tekeze hydropower reservoir under present and future climate scenarios. Inflow to the reservoir was simulated using hydro-climatic data from an ensemble of downscaled climate data based on the Coordinated Regional climate Downscaling Experiment over African domain (CORDEX-Africa with Coupled Intercomparison Project Phase 5 (CMIP5 simulations under Representative Concentration Pathway (RCP4.5 and RCP8.5 climate scenarios. Observed and projected inflows to Tekeze hydropower reservoir were used as input to the US Army Corps of Engineer’s Reservoir Evaluation System Perspective Reservoir Model (HEC-ResPRM, a reservoir operation model, to optimize hydropower reservoir release, storage and pool level. Results indicated that climate change has a clear impact on reservoir inflow and showed increase in annual and monthly inflow into the reservoir except in dry months from May to June under RCP4.5 and RCP8.5 climate scenarios. HEC-ResPRM optimal operation results showed an increase in Tekeze reservoir power storage potential up to 25% and 30% under RCP4.5 and RCP8.5 climate scenarios, respectively. This implies that Tekeze hydropower production will be affected by climate change. This analysis can be used by water resources planners and mangers to develop reservoir operation techniques considering climate change impact to increase power production.

  14. Parent-Offspring Conflict over Short-Term Mating Strategies

    Directory of Open Access Journals (Sweden)

    Spyroulla Georgiou

    2011-12-01

    Full Text Available Individuals engage in short-term mating strategies that enable them to obtain fitness benefits from casual relationships. These benefits, however, count for less and cost more to their parents. On this basis three hypotheses are tested. First, parents and offspring are likely to disagree over short-term mating strategies, with the former considering these as less acceptable than the latter. Second, parents are more likely to disapprove of the short-term mating strategies of their daughters than of their sons. Finally, mothers and fathers are expected to agree on how much they disagree over the short-term mating strategies of their children. Evidence from a sample of 148 Greek-Cypriot families (140 mothers, 105 fathers, 119 daughters, 77 sons provides support for the first two hypotheses and partial support for the third hypothesis. The implications of these findings for understanding family dynamics are further discussed.

  15. Hydropower assessment of Bolivia—A multisource satellite data and hydrologic modeling approach

    Science.gov (United States)

    Velpuri, Naga Manohar; Pervez, Shahriar; Cushing, W. Matthew

    2016-11-28

    (TRMM) reanalysis product (3B43) had the highest accuracies. The coarse-resolution (25-km) TRMM data were disaggregated to 5-km pixels using climatology information obtained from the Climate Hazards Group Infrared Precipitation with Stations dataset. About a 17-percent bias was observed in the disaggregated TRMM estimates, which was corrected using the station observations. The bias-corrected, disaggregated TRMM precipitation estimate was used to compute stream discharge using a regionalization approach. In regionalization approach, required homogeneous regions for Bolivia were derived from precipitation patterns and topographic characteristics using a k-means clustering approach. Using the discharge and head height estimates for each 1-km stream segment, we computed hydropower potential for 316,490 stream segments within Bolivia and that share borders with Bolivia. The total theoretical hydropower potential (TTHP) of these stream segments was found to be 212 gigawatts (GW). Out of this total, 77.4 GW was within protected areas where hydropower projects cannot be developed; hence, the remaining total theoretical hydropower in Bolivia (outside the protected areas) was estimated as 135 GW. Nearly 1,000 1-km stream segments, however, were within the boundaries of existing hydropower projects. The TTHP of these stream segments was nearly 1.4 GW, so the residual TTHP of the streams in Bolivia was estimated as 133 GW. Care should be exercised to understand and interpret the TTHP identified in this study because all the stream segments identified and assessed in this study cannot be harnessed to their full capacity; furthermore, factors such as required environmental flows, efficiency, economics, and feasibility need to be considered to better identify a more real-world hydropower potential. If environmental flow requirements of 20–40 percent are considered, the total theoretical power available reduces by 60–80 percent. In addition, a 0.72 efficiency factor further

  16. Verbal short-term memory in Down syndrome: a problem of memory, audition, or speech?

    Science.gov (United States)

    Jarrold, Christopher; Baddeley, Alan D; Phillips, Caroline E

    2002-06-01

    The current study explored three possible explanations of poor verbal short-term memory performance among individuals with Down syndrome in an attempt to determine whether the condition is associated with a fundamental verbal short-term memory deficit. The short-term memory performance of a group of 19 children and young adults with Down syndrome was contrasted with that of two control groups matched for level of receptive vocabulary. The specificity of a deficit was assessed by comparing memory for verbal and visuo-spatial information. The effect of auditory problems on performance was examined by contrasting memory for auditorily presented material with that for material presented both auditorily and visually. The influence of speech-motor difficulties was investigated by employing both a traditional recall procedure and a serial recognition procedure that reduced spoken response demands. Results confirmed that individuals with Down syndrome do show impaired verbal short-term memory performance for their level of receptive vocabulary. The findings also indicated that this deficit is specific to memory for verbal information and is not primarily caused by auditory or speech-production difficulties.

  17. Gross greenhouse gas fluxes from hydro-power reservoir compared to thermo-power plants

    International Nuclear Information System (INIS)

    Santos, Marco Aurelio dos; Pinguelli Rosa, Luiz; Sikar, Bohdan; Sikar, Elizabeth; Santos, Ednaldo Oliveira dos

    2006-01-01

    This paper presents the findings of gross carbon dioxide and methane emissions measurements in several Brazilian hydro-reservoirs, compared to thermo power generation. The term 'gross emissions' means gas flux measurements from the reservoir surface without natural pre-impoundment emissions by natural bodies such as the river channel, seasonal flooding and terrestrial ecosystems. The net emissions result from deducting pre-existing emissions by the reservoir. A power dam emits biogenic gases such as CO 2 and CH 4 . However, studies comparing gas emissions (gross emissions) from the reservoir surface with emissions by thermo-power generation technologies show that the hydro-based option presents better results in most cases analyzed. In this study, measurements were carried in the Miranda, Barra Bonita, Segredo, Tres Marias, Xingo, and Samuel and Tucurui reservoirs, located in two different climatological regimes. Additional data were used here from measurements taken at the Itaipu and Serra da Mesa reservoirs. Comparisons were also made between emissions from hydro-power plants and their thermo-based equivalents. Bearing in mind that the estimated values for hydro-power plants include emissions that are not totally anthropogenic, the hydro-power plants studied generally posted lower emissions than their equivalent thermo-based counterparts. Hydro-power complexes with greater power densities (capacity/area flooded-W/m 2 ), such as Itaipu, Xingo, Segredo and Miranda, have the best performance, well above thermo-power plants using state-of-the-art technology: combined cycle fueled by natural gas, with 50% efficiency. On the other hand, some hydro-power complexes with low-power density perform only slightly better or even worse than their thermo-power counterparts

  18. Circadian modulation of short-term memory in Drosophila.

    Science.gov (United States)

    Lyons, Lisa C; Roman, Gregg

    2009-01-01

    Endogenous biological clocks are widespread regulators of behavior and physiology, allowing for a more efficient allocation of efforts and resources over the course of a day. The extent that different processes are regulated by circadian oscillators, however, is not fully understood. We investigated the role of the circadian clock on short-term associative memory formation using a negatively reinforced olfactory-learning paradigm in Drosophila melanogaster. We found that memory formation was regulated in a circadian manner. The peak performance in short-term memory (STM) occurred during the early subjective night with a twofold performance amplitude after a single pairing of conditioned and unconditioned stimuli. This rhythm in memory is eliminated in both timeless and period mutants and is absent during constant light conditions. Circadian gating of sensory perception does not appear to underlie the rhythm in short-term memory as evidenced by the nonrhythmic shock avoidance and olfactory avoidance behaviors. Moreover, central brain oscillators appear to be responsible for the modulation as cryptochrome mutants, in which the antennal circadian oscillators are nonfunctional, demonstrate robust circadian rhythms in short-term memory. Together these data suggest that central, rather than peripheral, circadian oscillators modulate the formation of short-term associative memory and not the perception of the stimuli.

  19. Small and medium-sized hydropower projects in competitive markets: the case of Rio Piedras

    International Nuclear Information System (INIS)

    Restrepo Posada, Federico

    1999-01-01

    The article describes the case of the Rio Piedras Hydropower Project, a first private hydropower generation initiative in Colombia, within the new regulatory framework for the provision of public services and electric generation under laws 142 and 143, passed in 1994. Reference is made in this article to the background and characteristics of the Project, and some obstacles, challenges and risks encountered are described, as well as the way in which they are being controlled. The investment and commercialization modules developed in analyzing the project are also presented. Finally, some reflections are given as to the medium and long term prospects for electric generation projects in Colombia. (The author)

  20. Lost opportunities and future avenues to reconcile hydropower and sediment transport in the Mekong Basin through optimal sequencing of dam portfolios.

    Science.gov (United States)

    Castelletti, A.; Schmitt, R. J. P.; Bizzi, S.; Kondolf, G. M.

    2017-12-01

    Dams are essential to meet growing water and energy demands. While dams cumulatively impact downstream rivers on network-scales, dam development is mostly based on ad-hoc economic and environmental assessments of single dams. Here, we provide evidence that replacing this ad-hoc approach with early strategic planning of entire dam portfolios can greatly reduce conflicts between economic and environmental objectives of dams. In the Mekong Basin (800,000km2), 123 major dam sites (status-quo: 56 built and under construction) could generate 280,000 GWh/yr of hydropower. Cumulatively, dams risk interrupting the basin's sediment dynamics with severe impacts on livelihoods and eco-systems. To evaluate cumulative impacts and benefits of the ad-hoc planned status-quo portfolio, we combine the CASCADE sediment connectivity model with data on hydropower production and sediment trapping at each dam site. We couple CASCADE to a multi-objective genetic algorithm (BORG) identifying a) portfolios resulting in an optimal trade-off between cumulative sediment trapping and hydropower production and b) an optimal development sequence for each portfolio. We perform this analysis first for the pristine basin (i.e., without pre-existing dams) and then starting from the status-quo portfolio, deriving policy recommendations for which dams should be prioritized in the near future. The status-quo portfolio creates a sub-optimal trade-off between hydropower and sediment trapping, exploiting 50 % of the basin's hydro-electric potential and trapping 60 % of the sediment load. Alternative optimal portfolios could have produced equivalent hydropower for 30 % sediment trapping. Imminent development of mega-dams in the lower basin will increase hydropower production by 20 % but increase sediment trapping to >90 %. In contrast, following an optimal development sequence can still increase hydropower by 30 % with limited additional sediment trapping by prioritizing dams in upper parts of the basin. Our

  1. Short-term effect of cocoa product consumption on lipid profile: a meta-analysis of randomized controlled trials.

    Science.gov (United States)

    Jia, Lei; Liu, Xuan; Bai, Yong Yi; Li, Shao Hua; Sun, Kai; He, Chen; Hui, Rutai

    2010-07-01

    The effect of cocoa products on lipid changes is controversial. We aimed to identify and quantify the effect of cocoa on total cholesterol, LDL cholesterol, and HDL cholesterol. A comprehensive literature search was conducted for relevant trials of cocoa on lipid profile. Weighted mean differences were calculated for net changes in lipid concentrations by using fixed-effects or random-effects models. Previously defined subgroup analyses were performed to identify the source of heterogeneity. Eight trials (involving 215 participants) were included and evaluated. Because there was only one relatively longer-term study, we focused on the short-term data to evaluate the effects of cocoa on plasma lipid. Cocoa consumption significantly lowered LDL cholesterol by 5.87 mg/dL (95% CI: -11.13, -0.61; P consumption significantly reduced blood cholesterol, but the changes were dependent on the dose of cocoa consumption and the healthy status of participants. There was no dose response and no effect in healthy participants. Future high-quality studies are needed to determine the efficiency of moderate cocoa consumption on lipid profile in long-term intervention and in subjects with other cardiometabolic risk factors.

  2. The Role of Short-term Consolidation in Memory Persistence

    OpenAIRE

    Timothy J. Ricker

    2015-01-01

    Short-term memory, often described as working memory, is one of the most fundamental information processing systems of the human brain. Short-term memory function is necessary for language, spatial navigation, problem solving, and many other daily activities. Given its importance to cognitive function, understanding the architecture of short-term memory is of crucial importance to understanding human behavior. Recent work from several laboratories investigating the entry of information into s...

  3. The interaction of short-term and long-term memory in phonetic category formation

    Science.gov (United States)

    Harnsberger, James D.

    2002-05-01

    This study examined the role that short-term memory capacity plays in the relationship between novel stimuli (e.g., non-native speech sounds, native nonsense words) and phonetic categories in long-term memory. Thirty native speakers of American English were administered five tests: categorial AXB discrimination using nasal consonants from Malayalam; categorial identification, also using Malayalam nasals, which measured the influence of phonetic categories in long-term memory; digit span; nonword span, a short-term memory measure mediated by phonetic categories in long-term memory; and paired-associate word learning (word-word and word-nonword pairs). The results showed that almost all measures were significantly correlated with one another. The strongest predictor for the discrimination and word-nonword learning results was nonword (r=+0.62) and digit span (r=+0.51), respectively. When the identification test results were partialed out, only nonword span significantly correlated with discrimination. The results show a strong influence of short-term memory capacity on the encoding of phonetic detail within phonetic categories and suggest that long-term memory representations regulate the capacity of short-term memory to preserve information for subsequent encoding. The results of this study will also be discussed with regards to resolving the tension between episodic and abstract models of phonetic category structure.

  4. Game theory competition analysis of reservoir water supply and hydropower generation

    Science.gov (United States)

    Lee, T.

    2013-12-01

    The total installed capacity of the power generation systems in Taiwan is about 41,000 MW. Hydropower is one of the most important renewable energy sources, with hydropower generation capacity of about 4,540 MW. The aim of this research is to analyze competition between water supply and hydropower generation in water-energy systems. The major relationships between water and energy systems include hydropower generation by water, energy consumption for water system operation, and water consumption for energy system. In this research, a game-theoretic Cournot model is formulated to simulate oligopolistic competition between water supply, hydropower generation, and co-fired power generation in water-energy systems. A Nash equilibrium of the competitive market is derived and solved by GAMS with PATH solver. In addition, a case study analyzing the competition among water supply and hydropower generation of De-ji and Ku-Kuan reservoirs, Taipower, Star Energy, and Star-Yuan power companies in central Taiwan is conducted.

  5. Semantic and phonological contributions to short-term repetition and long-term cued sentence recall.

    Science.gov (United States)

    Meltzer, Jed A; Rose, Nathan S; Deschamps, Tiffany; Leigh, Rosie C; Panamsky, Lilia; Silberberg, Alexandra; Madani, Noushin; Links, Kira A

    2016-02-01

    The function of verbal short-term memory is supported not only by the phonological loop, but also by semantic resources that may operate on both short and long time scales. Elucidation of the neural underpinnings of these mechanisms requires effective behavioral manipulations that can selectively engage them. We developed a novel cued sentence recall paradigm to assess the effects of two factors on sentence recall accuracy at short-term and long-term stages. Participants initially repeated auditory sentences immediately following a 14-s retention period. After this task was complete, long-term memory for each sentence was probed by a two-word recall cue. The sentences were either concrete (high imageability) or abstract (low imageability), and the initial 14-s retention period was filled with either an undemanding finger-tapping task or a more engaging articulatory suppression task (Exp. 1, counting backward by threes; Exp. 2, repeating a four-syllable nonword). Recall was always better for the concrete sentences. Articulatory suppression reduced accuracy in short-term recall, especially for abstract sentences, but the sentences initially recalled following articulatory suppression were retained better at the subsequent cued-recall test, suggesting that the engagement of semantic mechanisms for short-term retention promoted encoding of the sentence meaning into long-term memory. These results provide a basis for using sentence imageability and subsequent memory performance as probes of semantic engagement in short-term memory for sentences.

  6. Short-term and long-term sick-leave in Sweden

    DEFF Research Database (Denmark)

    Blank, N; Diderichsen, Finn

    1995-01-01

    The primary aim of the study was to analyse similarities and differences between repeated spells of short-term sick-leave (more than 3 spells of less than 7 days' duration in a 12-month period) and long-term absence through sickness (at least 1 spell of more than 59 days' duration in a 12-month p...

  7. ESTIMATING HYDROPOWER POTENTIAL OF SMALL RIVERS OF REPUBLIC OF MOLDOVA USING GIS

    Directory of Open Access Journals (Sweden)

    T. CASTRAVEŢ

    2018-06-01

    Full Text Available Estimating hydropower potential of small rivers of Republic of Moldova using GIS, The increasing demand for energy, especially from renewable and sustainable sources, spurs the development of small hydropower plants and encourages investment in new survey studies (Larentis et al., 2010. Preliminary hydropower survey studies usually carry huge uncertainties about the technical, economic and environmental feasibility of the undeveloped potential. This paper presents a methodology for hydropower potential sites assessment. The sequence of procedures to identify hydropower sites is based on remote sensing data and streamflow and rainfall data and was automated within GIS environment.

  8. Hydropower's Contribution to Energy Security

    Energy Technology Data Exchange (ETDEWEB)

    Altinbilek, D.; Abdel-Malek, R.; Devernay, J.M.; Gill, R.; Leney, S.; Moss, Terry; Schiffer, H.P.; Taylor, R.M.

    2007-07-01

    The role of hydropower within mixed power systems is analysed from the point of view of both quantitative and qualitative performance. Interrelationships with all other generation technologies are discussed and synergies identified. Resources, sustainability criteria and investment challenges are reviewed in the context of development. The objective of the paper is to define hydropower's contribution within the clean, clever and competitive markets of the future.

  9. Short-term Consumer Benefits of Dynamic Pricing

    OpenAIRE

    Dupont, Benjamin; De Jonghe, Cedric; Kessels, Kris; Belmans, Ronnie

    2011-01-01

    Consumer benefits of dynamic pricing depend on a variety of factors. Consumer characteristics and climatic circumstances widely differ, which forces a regional comparison. This paper presents a general overview of demand response programs and focuses on the short-term benefits of dynamic pricing for an average Flemish residential consumer. It reaches a methodology to develop a cost reflective dynamic pricing program and to estimate short-term bill savings. Participating in a dynamic pricing p...

  10. Refurbishment of hydropower generation plants

    International Nuclear Information System (INIS)

    Kofler, W.

    2001-01-01

    This article presents the factors taken into consideration and the methods used for the management of refurbishment work in the hydropower installations of the TUWAG - a Tyrolean hydropower company in Austria. The technical and financial advantages to be gained from refurbishment are discussed and the requirements placed on the structuring of refurbishment projects are described. Various factors such as plant operation and maintenance, increased returns through better efficiency and cost reduction through lower wear and tear and reduced risk of failure are discussed. Annexes to the article cover monitoring and measurement techniques, the simulation of mechanical and hydraulic conditions, profitability calculations and turbine management

  11. The Future of Hydropower: Assessing the Impacts of Climate Change, Energy Prices and New Storage Technologies

    Science.gov (United States)

    Gaudard, Ludovic; Madani, Kaveh; Romerio, Franco

    2016-04-01

    The future of hydropower depends on various drivers, and in particular on climate change, electricity market evolution and innovation in new storage technologies. Their impacts on the power plants' profitability can widely differ in regards of scale, timing, and probability of occurrence. In this respect, the risk should not be expressed only in terms of expected revenue, but also of uncertainty. These two aspects must be considered to assess the future of hydropower. This presentation discusses the impacts of climate change, electricity market volatility and competing energy storage's technologies and quantifies them in terms of annual revenue. Our simulations integrate a glacio-hydrological model (GERM) with various electricity market data and models (mean reversion and jump diffusion). The medium (2020-50) and long-term (2070-2100) are considered thanks to various greenhouse gas scenarios (A1B, A2 and RCP3PD) and the stochastic approach for the electricity prices. An algorithm named "threshold acceptance" is used to optimize the reservoir operations. The impacts' scale, and the related uncertainties are presented for Mauvoisin, which is a storage-hydropower plant situated in the Swiss Alps, and two generic pure pumped-storage installations, which are assessed with the prices of 17 European electricity markets. The discussion will highlight the key differences between the impacts brought about by the drivers.

  12. Hydropower and sustainability: resilience and vulnerability in China's powersheds.

    Science.gov (United States)

    McNally, Amy; Magee, Darrin; Wolf, Aaron T

    2009-07-01

    Large dams represent a whole complex of social, economic and ecological processes, perhaps more than any other large infrastructure project. Today, countries with rapidly developing economies are constructing new dams to provide energy and flood control to growing populations in riparian and distant urban communities. If the system is lacking institutional capacity to absorb these physical and institutional changes there is potential for conflict, thereby threatening human security. In this paper, we propose analyzing sustainability (political, socioeconomic, and ecological) in terms of resilience versus vulnerability, framed within the spatial abstraction of a powershed. The powershed framework facilitates multi-scalar and transboundary analysis while remaining focused on the questions of resilience and vulnerability relating to hydropower dams. Focusing on examples from China, this paper describes the complex nature of dams using the sustainability and powershed frameworks. We then analyze the roles of institutions in China to understand the relationships between power, human security and the socio-ecological system. To inform the study of conflicts over dams China is a particularly useful case study because we can examine what happens at the international, national and local scales. The powershed perspective allows us to examine resilience and vulnerability across political boundaries from a dynamic, process-defined analytical scale while remaining focused on a host of questions relating to hydro-development that invoke drivers and impacts on national and sub-national scales. The ability to disaggregate the affects of hydropower dam construction from political boundaries allows for a deeper analysis of resilience and vulnerability. From our analysis we find that reforms in China's hydropower sector since 1996 have been motivated by the need to create stability at the national scale rather than resilient solutions to China's growing demand for energy and water

  13. DOE Hydropower Program Biennial Report for FY 2005-2006

    Energy Technology Data Exchange (ETDEWEB)

    Sale, Michael J [ORNL; Cada, Glenn F [ORNL; Acker, Thomas L. [Northern Arizona State University and National Renewable Energy Laboratory; Carlson, Thomas [Pacific Northwest National Laboratory (PNNL); Dauble, Dennis D. [Pacific Northwest National Laboratory (PNNL); Hall, Douglas G. [Idaho National Laboratory (INL)

    2006-07-01

    SUMMARY The U.S. Department of Energy (DOE) Hydropower Program is part of the Office of Wind and Hydropower Technologies, Office of Energy Efficiency and Renewable Energy. The Program's mission is to conduct research and development (R&D) that will increase the technical, societal, and environmental benefits of hydropower. The Department's Hydropower Program activities are conducted by its national laboratories: Idaho National Laboratory (INL) [formerly Idaho National Engineering and Environmental Laboratory], Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and National Renewable Energy Laboratory (NREL), and by a number of industry, university, and federal research facilities. Programmatically, DOE Hydropower Program R&D activities are conducted in two areas: Technology Viability and Technology Application. The Technology Viability area has two components: (1) Advanced Hydropower Technology (Large Turbine Field Testing, Water Use Optimization, and Improved Mitigation Practices) and (2) Supporting Research and Testing (Environmental Performance Testing Methods, Computational and Physical Modeling, Instrumentation and Controls, and Environmental Analysis). The Technology Application area also has two components: (1) Systems Integration and Technology Acceptance (Hydro/Wind Integration, National Hydropower Collaborative, and Integration and Communications) and (2) Supporting Engineering and Analysis (Valuation Methods and Assessments and Characterization of Innovative Technology). This report describes the progress of the R&D conducted in FY 2005-2006 under all four program areas. Major accomplishments include the following: Conducted field testing of a Retrofit Aeration System to increase the dissolved oxygen content of water discharged from the turbines of the Osage Project in Missouri. Contributed to the installation and field testing of an advanced, minimum gap runner turbine at the Wanapum Dam project in Washington

  14. The FAST-T approach for operational, real time, short term hydrological forecasting: Results from the Betania Hydropower Reservoir case study

    Science.gov (United States)

    Domínguez, Efraín; Angarita, Hector; Rosmann, Thomas; Mendez, Zulma; Angulo, Gustavo

    2013-04-01

    A viable quantitative hydrological forecasting service is a combination of technological elements, personnel and knowledge, working together to establish a stable operational cycle of forecasts emission, dissemination and assimilation; hence, the process for establishing such system usually requires significant resources and time to reach an adequate development and integration in order to produce forecasts with acceptable levels of performance. Here are presented the results of this process for the recently implemented Operational Forecast Service for the Betania's Hydropower Reservoir - or SPHEB, located at the Upper-Magdalena River Basin (Colombia). The current scope of the SPHEB includes forecasting of water levels and discharge for the three main streams affluent to the reservoir, for lead times between +1 to +57 hours, and +1 to +10 days. The core of the SPHEB is the Flexible, Adaptive, Simple and Transient Time forecasting approach, namely FAST-T. This comprises of a set of data structures, mathematical kernel, distributed computing and network infrastructure designed to provide seamless real-time operational forecast and automatic model adjustment in case of failures in data transmission or assimilation. Among FAST-T main features are: an autonomous evaluation and detection of the most relevant information for the later configuration of forecasting models; an adaptively linearized mathematical kernel, the optimal adaptive linear combination or OALC, which provides a computationally simple and efficient algorithm for real-time applications; and finally, a meta-model catalog, containing prioritized forecast models at given stream conditions. The SPHEB is at present feed by the fraction of hydrological monitoring network installed at the basin that has telemetric capabilities via NOAA-GOES satellites (8 stages, approximately 47%) with data availability of about a 90% at one hour intervals. However, there is a dense network of 'conventional' hydro

  15. Musical and Verbal Memory in Alzheimer's Disease: A Study of Long-Term and Short-Term Memory

    Science.gov (United States)

    Menard, Marie-Claude; Belleville, Sylvie

    2009-01-01

    Musical memory was tested in Alzheimer patients and in healthy older adults using long-term and short-term memory tasks. Long-term memory (LTM) was tested with a recognition procedure using unfamiliar melodies. Short-term memory (STM) was evaluated with same/different judgment tasks on short series of notes. Musical memory was compared to verbal…

  16. Short-term energy outlook. Quarterly projections, 2nd quarter 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the second quarter of 1994 through the fourth quarter of 1995. Values for the first quarter of 1994, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available. The historical energy data, compiled into the second quarter 1994 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the STIFS. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service.

  17. Estimation of economic parameters of U.S. hydropower resources

    Energy Technology Data Exchange (ETDEWEB)

    Hall, Douglas G. [Idaho National Lab. (INL), Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab. (INEEL); Hunt, Richard T. [Idaho National Lab. (INL), Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab. (INEEL); Reeves, Kelly S. [Idaho National Lab. (INL), Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab. (INEEL); Carroll, Greg R. [Idaho National Lab. (INL), Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab. (INEEL)

    2003-06-01

    Tools for estimating the cost of developing and operating and maintaining hydropower resources in the form of regression curves were developed based on historical plant data. Development costs that were addressed included: licensing, construction, and five types of environmental mitigation. It was found that the data for each type of cost correlated well with plant capacity. A tool for estimating the annual and monthly electric generation of hydropower resources was also developed. Additional tools were developed to estimate the cost of upgrading a turbine or a generator. The development and operation and maintenance cost estimating tools, and the generation estimating tool were applied to 2,155 U.S. hydropower sites representing a total potential capacity of 43,036 MW. The sites included totally undeveloped sites, dams without a hydroelectric plant, and hydroelectric plants that could be expanded to achieve greater capacity. Site characteristics and estimated costs and generation for each site were assembled in a database in Excel format that is also included within the EERE Library under the title, “Estimation of Economic Parameters of U.S. Hydropower Resources - INL Hydropower Resource Economics Database.”

  18. Dynamic analysis of a pumped-storage hydropower plant with random power load

    Science.gov (United States)

    Zhang, Hao; Chen, Diyi; Xu, Beibei; Patelli, Edoardo; Tolo, Silvia

    2018-02-01

    This paper analyzes the dynamic response of a pumped-storage hydropower plant in generating mode. Considering the elastic water column effects in the penstock, a linearized reduced order dynamic model of the pumped-storage hydropower plant is used in this paper. As the power load is always random, a set of random generator electric power output is introduced to research the dynamic behaviors of the pumped-storage hydropower plant. Then, the influences of the PI gains on the dynamic characteristics of the pumped-storage hydropower plant with the random power load are analyzed. In addition, the effects of initial power load and PI parameters on the stability of the pumped-storage hydropower plant are studied in depth. All of the above results will provide theoretical guidance for the study and analysis of the pumped-storage hydropower plant.

  19. Loss of European silver eel passing a hydropower station

    DEFF Research Database (Denmark)

    Pedersen, Michael Ingemann; Jepsen, Niels; Aarestrup, Kim

    2012-01-01

    The aim of this study was to assess escapement success of silver eels, Anguilla anguilla (L.), in a lowland river while passing a reservoir and a hydropower station. It was hypothesized that passage success would be lowest at the hydropower station and that survival and migration speed would...... that within the study period, only 23% of the tagged eels reached the tidal limit, mainly due to difficulties in passing the hydropower dam. With such high loss-rates, the escapement goals set in the management plan cannot be achieved...

  20. Do Short-Term Managerial Objectives Lead to Under- or Over-Investment in Long-Term Projects

    OpenAIRE

    Lucian Arye Bebchuk; Lars A. Stole

    1994-01-01

    This paper studies managerial decisions about investment in long-run projects in the presence of imperfect information (the market knows less about such investments than the firm's managers) and short-term managerial objectives (the managers are concerned about the short-term stock price as well as the long-term stock price). Prior work has suggested that imperfect information and short-term managerial objectives induce managers to underinvest in long-run projects. We show that either underin...

  1. Numerical and in-situ investigations of water hammer effects in Drava river Kaplan turbine hydropower plants

    International Nuclear Information System (INIS)

    Bergant, A; Gregorc, B; Gale, J

    2012-01-01

    This paper deals with critical flow regimes that may induce unacceptable water hammer in Kaplan turbine hydropower plants. Water hammer analysis should be performed for normal, emergency and catastrophic operating conditions. Hydropower plants with Kaplan turbines are usually comprised of relatively short inlet and outlet conduits. The rigid water hammer theory can be used for this case. For hydropower plants with long penstocks the elastic water hammer should be used. Some Kaplan turbine units are installed in systems with long open channels. In this case, water level oscillations in the channels should be carefully investigated. Computational results are compared with results of measurements in recently rehabilitated seven Drava river hydroelectric power plants in Slovenia. Water hammer in the six power plants is controlled by appropriate adjustment of the wicket gates and runner blades closing/opening manoeuvres. Due to very long inflow and outflow open channels in Zlatolicje HPP a special vaned pressure regulating device attenuates extreme pressures in Kaplan turbine flow-passage system and controls unsteady flow in both open channels. Comparisons of results include normal operating regimes. The agreement between computed and measured results is reasonable.

  2. Numerical and in-situ investigations of water hammer effects in Drava river Kaplan turbine hydropower plants

    Science.gov (United States)

    Bergant, A.; Gregorc, B.; Gale, J.

    2012-11-01

    This paper deals with critical flow regimes that may induce unacceptable water hammer in Kaplan turbine hydropower plants. Water hammer analysis should be performed for normal, emergency and catastrophic operating conditions. Hydropower plants with Kaplan turbines are usually comprised of relatively short inlet and outlet conduits. The rigid water hammer theory can be used for this case. For hydropower plants with long penstocks the elastic water hammer should be used. Some Kaplan turbine units are installed in systems with long open channels. In this case, water level oscillations in the channels should be carefully investigated. Computational results are compared with results of measurements in recently rehabilitated seven Drava river hydroelectric power plants in Slovenia. Water hammer in the six power plants is controlled by appropriate adjustment of the wicket gates and runner blades closing/opening manoeuvres. Due to very long inflow and outflow open channels in Zlatoličje HPP a special vaned pressure regulating device attenuates extreme pressures in Kaplan turbine flow-passage system and controls unsteady flow in both open channels. Comparisons of results include normal operating regimes. The agreement between computed and measured results is reasonable.

  3. Sleep Quality, Short-Term and Long-Term CPAP Adherence

    Science.gov (United States)

    Somiah, Manya; Taxin, Zachary; Keating, Joseph; Mooney, Anne M.; Norman, Robert G.; Rapoport, David M.; Ayappa, Indu

    2012-01-01

    Study Objectives: Adherence to CPAP therapy is low in patients with obstructive sleep apnea/hypopnea syndrome (OSAHS). The purpose of the present study was to evaluate the utility of measures of sleep architecture and sleep continuity on the CPAP titration study as predictors of both short- and long-term CPAP adherence. Methods: 93 patients with OSAHS (RDI 42.8 ± 34.3/h) underwent in-laboratory diagnostic polysomnography, CPAP titration, and follow-up polysomnography (NPSG) on CPAP. Adherence to CPAP was objectively monitored. Short-term (ST) CPAP adherence was averaged over 14 days immediately following the titration study. Long-term (LT) CPAP adherence was obtained in 56/93 patients after approximately 2 months of CPAP use. Patients were grouped into CPAP adherence groups for ST ( 4 h) and LT adherence ( 4 h). Sleep architecture, sleep disordered breathing (SDB) indices, and daytime outcome variables from the diagnostic and titration NPSGs were compared between CPAP adherence groups. Results: There was a significant relationship between ST and LT CPAP adherence (r = 0.81, p CPAP adherence groups had significantly lower %N2 and greater %REM on the titration NPSG. A model combining change in sleep efficiency and change in sleep continuity between the diagnostic and titration NPSGs predicted 17% of the variance in LT adherence (p = 0.006). Conclusions: These findings demonstrate that characteristics of sleep architecture, even on the titration NPSG, may predict some of the variance in CPAP adherence. Better sleep quality on the titration night was related to better CPAP adherence, suggesting that interventions to improve sleep on/prior to the CPAP titration study might be used as a therapeutic intervention to improve CPAP adherence. Citation: Somiah M; Taxin Z; Keating J; Mooney AM; Norman RG; Rapoport DM; Ayappa I. Sleep quality, short-term and long-term CPAP adherence. J Clin Sleep Med 2012;8(5):489-500. PMID:23066359

  4. 75 FR 67993 - Hydropower Resource Assessment at Existing Reclamation Facilities-Draft Report

    Science.gov (United States)

    2010-11-04

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Hydropower Resource Assessment at Existing... comment the ``Hydropower Resource Assessment at Existing Reclamation Facilities'' (HRA) Draft Report. The HRA is an assessment of the economic and technical potential for hydropower development at existing...

  5. 75 FR 81643 - Hydropower Resource Assessment at Existing Reclamation Facilities-Draft Report

    Science.gov (United States)

    2010-12-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Hydropower Resource Assessment at Existing... period for review of the Hydropower Resource Assessment at Existing Reclamation Facilities Draft Report... sustainable, affordable hydropower for our national electricity supplies. Reclamation has 476 dams and 8,116...

  6. Assessing the associative deficit of older adults in long-term and short-term/working memory.

    Science.gov (United States)

    Chen, Tina; Naveh-Benjamin, Moshe

    2012-09-01

    Older adults exhibit a deficit in associative long-term memory relative to younger adults. However, the literature is inconclusive regarding whether this deficit is attenuated in short-term/working memory. To elucidate the issue, three experiments assessed younger and older adults' item and interitem associative memory and the effects of several variables that might potentially contribute to the inconsistent pattern of results in previous studies. In Experiment 1, participants were tested on item and associative recognition memory with both long-term and short-term retention intervals in a single, continuous recognition paradigm. There was an associative deficit for older adults in the short-term and long-term intervals. Using only short-term intervals, Experiment 2 utilized mixed and blocked test designs to examine the effect of test event salience. Blocking the test did not attenuate the age-related associative deficit seen in the mixed test blocks. Finally, an age-related associative deficit was found in Experiment 3, under both sequential and simultaneous presentation conditions. Even while accounting for some methodological issues, the associative deficit of older adults is evident in short-term/working memory.

  7. Quantifying climate change impacts on hydropower generation and implications on electric grid greenhouse gas emissions and operation

    International Nuclear Information System (INIS)

    Tarroja, Brian; AghaKouchak, Amir; Samuelsen, Scott

    2016-01-01

    Here we translate the impacts of climate change on hydropower generation, and discuss implications on greenhouse gas (GHG) emissions and operation in California. We integrate a model of major surface-water reservoirs with an electric grid dispatch model, and perturb it by projected runoff based on representative concentration pathways (RCP4.5 and RCP8.5). Results show that climate change and variability is expected to decrease the average annual hydropower generation by 3.1% under RCP4.5, but have negligible impact under the RCP8.5. Model simulations indicate more inflow, caused by more future extremes, in the future that does not necessarily translate to more energy production because of reservoir spillage of water. While overall volume of future available water for energy production may be similar or higher, the delivery of this volume is expected to be significantly more variable in the future climate than the historical average, which has many implications for hydropower generation. Our results show that the expected changes in future climate leads to increases in grid GHG emissions, load-following capacity, fuel usage, and costs for the RCP4.5 due to generation shortfall, and very slight increases in the same metrics for the RCP8.5 case due to variability causing decreased efficiencies in load-following power plants. - Highlights: • Climate change caused increased overall volume inflow levels to hydropower reservoirs. • Extreme precipitation events caused reservoir spillage and inability to fully use increased inflow. • Hydropower generation decreased for RCP 4.5 and remained similar to historical for RCP 8.5. • Increased climate variability caused decreased efficiencies in load-following power plants.

  8. Quantifying the Value of Hydropower in the Electric Grid. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Key, T. [Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States)

    2013-02-01

    The report summarizes a 3-year DOE study focused on defining value of hydropower assets in a changing electric grid. The study looked at existing large hydropower operations in the U.S., models for different electricity futures, markets, costs of existing and new technologies as well as trends related to hydropower investments in other parts of the world.

  9. The pedagogy of Short-Term Study-Abroad Programs

    Directory of Open Access Journals (Sweden)

    Jude Gonsalvez

    2013-10-01

    Full Text Available This paper focuses on establishing guidelines on the pedagogy of short term study abroad programs. This study follows 33 students who participated in a short-term study-abroad program to India with the researcher from 2006 through 2011. The study relies heavily on the student reflections and expressions as they experienced them. It is qualitative in nature. Focus groups were the main method of data collection, where participants were invited to reflect, express, and share their experiences with one another. This provided an opportunity for the participants to come together, relive their experiences, and help provide information as to how and what type of an influence this short-term study-abroad program provided.

  10. Portfolio management of hydropower producer via stochastic programming

    International Nuclear Information System (INIS)

    Liu, Hongling; Jiang, Chuanwen; Zhang, Yan

    2009-01-01

    This paper presents a stochastic linear programming framework for the hydropower portfolio management problem with uncertainty in market prices and inflows on medium term. The uncertainty is modeled as a scenario tree using the Monte Carlo simulation method, and the objective is to maximize the expected revenue over the entire scenario tree. The portfolio decisions of the stochastic model are formulated as a tradeoff involving different scenarios. Numerical results illustrate the impact of uncertainty on the portfolio management decisions, and indicate the significant value of stochastic solution. (author)

  11. Genetic deletion of melanin-concentrating hormone neurons impairs hippocampal short-term synaptic plasticity and hippocampal-dependent forms of short-term memory.

    Science.gov (United States)

    Le Barillier, Léa; Léger, Lucienne; Luppi, Pierre-Hervé; Fort, Patrice; Malleret, Gaël; Salin, Paul-Antoine

    2015-11-01

    The cognitive role of melanin-concentrating hormone (MCH) neurons, a neuronal population located in the mammalian postero-lateral hypothalamus sending projections to all cortical areas, remains poorly understood. Mainly activated during paradoxical sleep (PS), MCH neurons have been implicated in sleep regulation. The genetic deletion of the only known MCH receptor in rodent leads to an impairment of hippocampal dependent forms of memory and to an alteration of hippocampal long-term synaptic plasticity. By using MCH/ataxin3 mice, a genetic model characterized by a selective deletion of MCH neurons in the adult, we investigated the role of MCH neurons in hippocampal synaptic plasticity and hippocampal-dependent forms of memory. MCH/ataxin3 mice exhibited a deficit in the early part of both long-term potentiation and depression in the CA1 area of the hippocampus. Post-tetanic potentiation (PTP) was diminished while synaptic depression induced by repetitive stimulation was enhanced suggesting an alteration of pre-synaptic forms of short-term plasticity in these mice. Behaviorally, MCH/ataxin3 mice spent more time and showed a higher level of hesitation as compared to their controls in performing a short-term memory T-maze task, displayed retardation in acquiring a reference memory task in a Morris water maze, and showed a habituation deficit in an open field task. Deletion of MCH neurons could thus alter spatial short-term memory by impairing short-term plasticity in the hippocampus. Altogether, these findings could provide a cellular mechanism by which PS may facilitate memory encoding. Via MCH neuron activation, PS could prepare the day's learning by increasing and modulating short-term synaptic plasticity in the hippocampus. © 2015 Wiley Periodicals, Inc.

  12. Hydropower scene: boost for Dominican power supply

    Energy Technology Data Exchange (ETDEWEB)

    1988-12-01

    When it is completed in 1991, the 150 MW Jiguey-Aguacate multi-purpose hydropower scheme will be the largest hydro project in the Dominican Republic. Construction of the scheme was recommended as a result of various studies carried out by the Instituto Nacional de Recursos Hidraulicos (INDHRI), which examined the hydropower potential of the Niazo river. Work is now in progress on site, with commissioning of the first unit expected in 1990.

  13. Relationship between short and long term radon measurements

    International Nuclear Information System (INIS)

    Martinez, T.; Ramirez, D.; Navarrete, M.; Cabrera, L.; Ramirez, A.; Gonzalez, P.

    2000-01-01

    In this work the radon group of the Faculty of Chemistry at the National University of Mexico presents the results obtained in the establishment of a relation between the short and long term radon measures made with passive electret detectors E-PERM type LLT and HST. The measures were carried out inside single family dwellings (open house condition) located in the southeast of Mexico City (in Xochimilco) during the four seasons of the year 1997. A correlation was established between the short term measures (five days) and those of a long term for every season as well as an annual average, with an equation that relates them. The objective and advantage of this correlation are that with a short term measure it is possible to predict the annual mean radon concentration, that represents a saving of human and economic resources. (author)

  14. Impact of short-term severe accident management actions in a long-term perspective. Final Report

    International Nuclear Information System (INIS)

    2000-03-01

    The present systems for severe accident management are focused on mitigating the consequences of special severe accident phenomena and to reach a safe plant state. However, in the development of strategies and procedures for severe accident management, it is also important to consider the long-term perspective of accident management and especially to secure the safe state of the plant. The main reason for this is that certain short-term actions have an impact on the long-term scenario. Both positive and negative effects from short-term actions on the accident management in the long-term perspective have been included in this paper. Short-term actions are accident management measures taken within about 24 hours after the initiating event. The purpose of short-term actions is to reach a stable status of the plant. The main goal in the long-term perspective is to maintain the reactor in a stable state and prevent uncontrolled releases of activity. The purpose of this short Technical Note, deliberately limited in scope, is to draw attention to potential long-term problems, important to utilities and regulatory authorities, arising from the way a severe accident would be managed during the first hours. Its objective is to encourage discussions on the safest - and maybe also most economical - way to manage a severe accident in the long term by not making the situation worse through inappropriate short-term actions, and on the identification of short-term actions likely to make long-term management easier and safer. The Note is intended as a contribution to the knowledge base put at the disposal of Member countries through international collaboration. The scope of the work has been limited to a literature search. Useful further activities have been identified. However, there is no proposal, at this stage, for more detailed work to be undertaken under the auspices of the CSNI. Plant-specific applications would need to be developed by utilities

  15. DOE Hydropower Program biennial report 1996-1997 (with an updated annotated bibliography)

    Energy Technology Data Exchange (ETDEWEB)

    Rinehart, B.N.; Francfort, J.E.; Sommers, G.L. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Cada, G.F.; Sale, M.J. [Oak Ridge National Lab., TN (United States)

    1997-06-01

    This report, the latest in a series of biennial Hydropower Program reports sponsored by the US Department of Energy, summarizes the research and development and technology transfer activities of fiscal years 1996 and 1997. The report discusses the activities in the six areas of the hydropower program: advanced hydropower turbine systems; environmental research; hydropower research and development; renewable Indian energy resources; resource assessment; and technology transfer. The report also includes an annotated bibliography of reports pertinent to hydropower, written by the staff of the Idaho National Engineering and Environmental Laboratory, Oak Ridge National Laboratory, Federal and state agencies, cities, metropolitan water districts, irrigation companies, and public and independent utilities. Most reports are available from the National Technical Information Service.

  16. Climate Vulnerability of Hydro-power infrastructure in the Eastern African Power Pool

    Science.gov (United States)

    Sridharan, Vignesh

    2017-04-01

    At present there is around 6000 MW of installed hydropower capacity in the Eastern African power pool (EAPP)[1]. With countries aggressively planning to achieve the Sustainable development goal (SDG) of ensuring access to affordable electricity for all, a three-fold increase in hydropower capacity is expected by 2040 [1]. Most of the existing and planned infrastructure lie inside the Nile River Basin. The latest assessment report (AR 5) from the Intergovernmental Panel on Climate Change (IPCC) indicates a high level of climatic uncertainty in the Nile Basin. The Climate Moisture index (CMI) for the Eastern Nile region and the Nile Equatorial lakes varies significantly across the different General Circulation Models (GCM)[2]. Such high uncertainty casts a shadow on the plans to expand hydropower capacity, doubting whether hydropower expansion can contribute to the goal of improving access to electricity or end up as sunk investments. In this assessment, we analyze adaptation strategies for national energy systems in the Eastern African Power Pool (EAPP), which minimize the regret that could potentially arise from impacts of a changed climate. An energy systems model of the EAPP is developed representing national electricity supply infrastructure. Cross border transmission and hydropower infrastructure is defined at individual project level. The energy systems model is coupled with a water systems management model of the Nile River Basin that calculates the water availability at different hydropower infrastructures under a range of climate scenarios. The results suggest that a robust adaptation strategy consisting of investments in cross border electricity transmission infrastructure and diversifying sources of electricity supply will require additional investments of USD 4.2 billion by 2050. However, this leads to fuel and operational cost savings of up to USD 22.6 billion, depending on the climate scenario. [1] "Platts, 2016. World Electric Power Plants Database

  17. Hydropower generation, flood control and dam cascades: A national assessment for Vietnam

    Science.gov (United States)

    Nguyen-Tien, Viet; Elliott, Robert J. R.; Strobl, Eric A.

    2018-05-01

    Vietnam is a country with diverse terrain and climatic conditions and a dependency on hydropower for a significant proportion of its power needs and as such, is particularly vulnerable to changes in climate. In this paper we apply SWAT (Soil and Water Assessment Tool) derived discharge simulation results coupled with regression analysis to estimate the performance of hydropower plants for Vietnam between 1995 and mid-2014 when both power supply and demand increased rapidly. Our approach is to examine the watershed formed from three large inter-boundary basins: The Red River, the Vietnam Coast and the Lower Mekong River, which have a total area of 977,964 km2. We then divide this area into 7,887 sub-basins with an average area of 131.6 km2 (based on level 12 of HydroSHEDS/HydroBASINS datasets) and 53,024 Hydrological Response Units (HRUs). Next we simulate river flow for the 40 largest hydropower plants across Vietnam. Our validation process demonstrates that the simulated flows are significantly correlated with the gauged inflows into these dams and are able to serve as a good proxy for the inflows into hydropower dams in our baseline energy regression, which captures 87.7% of the variation in monthly power generation. In other results we estimate that large dams sacrifice on average around 18.2% of their contemporaneous production for the purpose of flood control. When we assess Vietnam's current alignment of dams we find that the current cascades of large hydropower dams appear to be reasonably efficient: each MWh/day increase in upstream generation adds 0.146 MWh/day to downstream generation. The study provides evidence for the multiple benefits of a national system of large hydropower dams using a cascade design. Such a system may help overcome future adverse impacts from changes in climate conditions. However, our results show that there is still room for improvement in the harmonization of cascades in some basins. Finally, possible adverse hydro

  18. Ordered short-term memory differs in signers and speakers: Implications for models of short-term memory

    OpenAIRE

    Bavelier, Daphne; Newport, Elissa L.; Hall, Matt; Supalla, Ted; Boutla, Mrim

    2008-01-01

    Capacity limits in linguistic short-term memory (STM) are typically measured with forward span tasks in which participants are asked to recall lists of words in the order presented. Using such tasks, native signers of American Sign Language (ASL) exhibit smaller spans than native speakers (Boutla, Supalla, Newport, & Bavelier, 2004). Here, we test the hypothesis that this population difference reflects differences in the way speakers and signers maintain temporal order information in short-te...

  19. 78 FR 55251 - Hydropower Regulatory Efficiency Act of 2013; Notice of Workshop

    Science.gov (United States)

    2013-09-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD13-9-000] Hydropower... hydropower development at non-powered dams and closed-loop pumped storage projects in compliance with section 6 of the Hydropower Regulatory Efficiency Act of 2013. Participants should be prepared to discuss...

  20. Short-term and long-term deflection of reinforced hollow core ...

    African Journals Online (AJOL)

    This paper presents a study on different methods of analysis that are currently used by design codes to predict the short-term and long-term deflection of reinforced concrete slab systems and compares the predicted deflections with measured deflections. The experimental work to measure deflections involved the testing of ...

  1. Underground Pumped Storage Hydropower using abandoned open pit mines: influence of groundwater seepage on the system efficiency

    Science.gov (United States)

    Pujades, Estanislao; Bodeux, Sarah; Orban, Philippe; Dassargues, Alain

    2016-04-01

    Pumped Storage Hydropower (PSH) plants can be used to manage the production of electrical energy according to the demand. These plants allow storing and generating electricity during low and high demand energy periods, respectively. Nevertheless, PSH plants require a determined topography because two reservoirs located at different heights are needed. At sites where PSH plants cannot be constructed due to topography requirements (flat regions), Underground Pumped Storage Hydropower (UPSH) plants can be used to adjust the electricity production. These plants consist in two reservoirs, the upper one is located at the surface (or at shallow depth) while the lower one is underground (or deeper). Abandoned open pit mines can be used as lower reservoirs but these are rarely isolated. As a consequence, UPSH plants will interact with surrounding aquifers exchanging groundwater. Groundwater seepage will modify hydraulic head inside the underground reservoir affecting global efficiency of the UPSH plant. The influence on the plant efficiency caused by the interaction between UPSH plants and aquifers will depend on the aquifer parameters, underground reservoir properties and pumping and injection characteristics. The alteration of the efficiency produced by the groundwater exchanges, which has not been previously considered, is now studied numerically. A set of numerical simulations are performed to establish in terms of efficiency the effects of groundwater exchanges and the optimum conditions to locate an UPSH plant.

  2. Robust short-term memory without synaptic learning.

    Directory of Open Access Journals (Sweden)

    Samuel Johnson

    Full Text Available Short-term memory in the brain cannot in general be explained the way long-term memory can--as a gradual modification of synaptic weights--since it takes place too quickly. Theories based on some form of cellular bistability, however, do not seem able to account for the fact that noisy neurons can collectively store information in a robust manner. We show how a sufficiently clustered network of simple model neurons can be instantly induced into metastable states capable of retaining information for a short time (a few seconds. The mechanism is robust to different network topologies and kinds of neural model. This could constitute a viable means available to the brain for sensory and/or short-term memory with no need of synaptic learning. Relevant phenomena described by neurobiology and psychology, such as local synchronization of synaptic inputs and power-law statistics of forgetting avalanches, emerge naturally from this mechanism, and we suggest possible experiments to test its viability in more biological settings.

  3. Robust short-term memory without synaptic learning.

    Science.gov (United States)

    Johnson, Samuel; Marro, J; Torres, Joaquín J

    2013-01-01

    Short-term memory in the brain cannot in general be explained the way long-term memory can--as a gradual modification of synaptic weights--since it takes place too quickly. Theories based on some form of cellular bistability, however, do not seem able to account for the fact that noisy neurons can collectively store information in a robust manner. We show how a sufficiently clustered network of simple model neurons can be instantly induced into metastable states capable of retaining information for a short time (a few seconds). The mechanism is robust to different network topologies and kinds of neural model. This could constitute a viable means available to the brain for sensory and/or short-term memory with no need of synaptic learning. Relevant phenomena described by neurobiology and psychology, such as local synchronization of synaptic inputs and power-law statistics of forgetting avalanches, emerge naturally from this mechanism, and we suggest possible experiments to test its viability in more biological settings.

  4. Robust Short-Term Memory without Synaptic Learning

    Science.gov (United States)

    Johnson, Samuel; Marro, J.; Torres, Joaquín J.

    2013-01-01

    Short-term memory in the brain cannot in general be explained the way long-term memory can – as a gradual modification of synaptic weights – since it takes place too quickly. Theories based on some form of cellular bistability, however, do not seem able to account for the fact that noisy neurons can collectively store information in a robust manner. We show how a sufficiently clustered network of simple model neurons can be instantly induced into metastable states capable of retaining information for a short time (a few seconds). The mechanism is robust to different network topologies and kinds of neural model. This could constitute a viable means available to the brain for sensory and/or short-term memory with no need of synaptic learning. Relevant phenomena described by neurobiology and psychology, such as local synchronization of synaptic inputs and power-law statistics of forgetting avalanches, emerge naturally from this mechanism, and we suggest possible experiments to test its viability in more biological settings. PMID:23349664

  5. Fuzzy rule-based model for hydropower reservoirs operation

    Energy Technology Data Exchange (ETDEWEB)

    Moeini, R.; Afshar, A.; Afshar, M.H. [School of Civil Engineering, Iran University of Science and Technology, Tehran (Iran, Islamic Republic of)

    2011-02-15

    Real-time hydropower reservoir operation is a continuous decision-making process of determining the water level of a reservoir or the volume of water released from it. The hydropower operation is usually based on operating policies and rules defined and decided upon in strategic planning. This paper presents a fuzzy rule-based model for the operation of hydropower reservoirs. The proposed fuzzy rule-based model presents a set of suitable operating rules for release from the reservoir based on ideal or target storage levels. The model operates on an 'if-then' principle, in which the 'if' is a vector of fuzzy premises and the 'then' is a vector of fuzzy consequences. In this paper, reservoir storage, inflow, and period are used as premises and the release as the consequence. The steps involved in the development of the model include, construction of membership functions for the inflow, storage and the release, formulation of fuzzy rules, implication, aggregation and defuzzification. The required knowledge bases for the formulation of the fuzzy rules is obtained form a stochastic dynamic programming (SDP) model with a steady state policy. The proposed model is applied to the hydropower operation of ''Dez'' reservoir in Iran and the results are presented and compared with those of the SDP model. The results indicate the ability of the method to solve hydropower reservoir operation problems. (author)

  6. Multi-Model Assessment of Global Hydropower and Cooling Water Discharge Potential Under Climate Change

    Science.gov (United States)

    van Vliet, M. T. H.; van Beek, L. P. H.; Eisener, S.; Wada, Y.; Bierkens, M. F. P.

    2016-01-01

    Worldwide, 98% of total electricity is currently produced by thermoelectric power and hydropower. Climate change is expected to directly impact electricity supply, in terms of both water availability for hydropower generation and cooling water usage for thermoelectric power. Improved understanding of how climate change may impact the availability and temperature of water resources is therefore of major importance. Here we use a multi-model ensemble to show the potential impacts of climate change on global hydropower and cooling water discharge potential. For the first time, combined projections of streamflow and water temperature were produced with three global hydrological models (GHMs) to account for uncertainties in the structure and parametrization of these GHMs in both water availability and water temperature. The GHMs were forced with bias-corrected output of five general circulation models (GCMs) for both the lowest and highest representative concentration pathways (RCP2.6 and RCP8.5). The ensemble projections of streamflow and water temperature were then used to quantify impacts on gross hydropower potential and cooling water discharge capacity of rivers worldwide. We show that global gross hydropower potential is expected to increase between +2.4% (GCM-GHM ensemble mean for RCP 2.6) and +6.3% (RCP 8.5) for the 2080s compared to 1971-2000. The strongest increases in hydropower potential are expected for Central Africa, India, central Asia and the northern high-latitudes, with 18-33% of the world population living in these areas by the 2080s. Global mean cooling water discharge capacity is projected to decrease by 4.5-15% (2080s). The largest reductions are found for the United States, Europe, eastern Asia, and southern parts of South America, Africa and Australia, where strong water temperature increases are projected combined with reductions in mean annual streamflow. These regions are expected to affect 11-14% (for RCP2.6 and the shared socioeconomic

  7. From "E-flows" to "Sed-flows": Managing the Problem of Sediment in High Altitude Hydropower Systems

    Science.gov (United States)

    Gabbud, C.; Lane, S. N.

    2017-12-01

    The connections between stream hydraulics, geomorphology and ecosystems in mountain rivers have been substantially perturbed by humans, for example through flow regulation related to hydropower activities. It is well known that the ecosystem impacts downstream of hydropower dams may be managed by a properly designed compensation release or environmental flows ("e-flows"), and such flows may also include sediment considerations (e.g. to break up bed armor). However, there has been much less attention given to the ecosystem impacts of water intakes (where water is extracted and transferred for storage and/or power production), even though in many mountain systems such intakes may be prevalent. Flow intakes tend to be smaller than dams and because they fill quickly in the presence of sediment delivery, they often need to be flushed, many times within a day in Alpine glaciated catchments with high sediment yields. The associated short duration "flood" flow is characterised by very high sediment concentrations, which may drastically modify downstream habitat, both during the floods but also due to subsequent accumulation of "legacy" sediment. The impacts on flora and fauna of these systems have not been well studied. In addition, there are no guidelines established that might allow the design of "e-flows" that also treat this sediment problem, something we call "sed-flows". Through an Alpine field example, we quantify the hydrological, geomorphological, and ecosystem impacts of Alpine water transfer systems. The high sediment concentrations of these flushing flows lead to very high rates of channel disturbance downstream, superimposed upon long-term and progressive bed sediment accumulation. Monthly macroinvertebrate surveys over almost a two-year period showed that reductions in the flushing rate reduced rates of disturbance substantially, and led to rapid macroinvertebrate recovery, even in the seasons (autumn and winter) when biological activity should be reduced

  8. A GIS based assessment of hydropower potential in Hornád basin

    Directory of Open Access Journals (Sweden)

    �ofia Kuzevičová

    2013-12-01

    Full Text Available The issue of efficient use of hydropower, ones of the available renewable resources is currently in the process of sustainable development of each country, often addressing the issue. Incite multiple aspects. It is now seen just growing interest in exploiting the potential of hydropower. On the basis of active efforts are developed to map the total quantity of usability hydropower at basin level in Slovakia. GIS as a powerful and sophisticated tool for processing spatially localized information and offers support for renewable energy sources (not excluding the field of hydropower. Through the integration of spatial data allows assessing the real problems and thus contributing effectively to make rational decisions. Especially in the field of hydropower projects have GIS well founded importance. Of course is important to mention that the potential for hydroelectric power is useless without the operation of hydropower that converts water into electrical energy. For the needs of administrators of watercourses and operators of water systems, the proposed model can be an important tool for decision-making in relation to its implementation activities. Contribution to the design solutions for potential hydropower will address river basin Hornád.

  9. Design and production of a short 2D animated film

    OpenAIRE

    Prusnik, Petra

    2014-01-01

    Design and production of a short 2D animated film The thesis aims at analysing animation, the process of creating an ani- mated film with its technical and compositional details as well as show the process of making a short 2D animated movie with Toon Boom Studio. It is composed of theoretical and practical part. The theoretical part of this thesis consists of the definition of the term "animation", a quick overview of its history and evolution, and an in-depth look into var...

  10. The Development of Brazilian Municipalities Flooded by Hydropower Plants

    Science.gov (United States)

    Araujo, N.; Moretto, E. M.; Roquetti, D. R.; Beduschi, L. C.; Praia, A.; Pulice, S.; Albiach, E.; Athayde, S.

    2016-12-01

    Hydropower plants cause negative environmental impacts during the phases of construction and operation. On the other hand, there is a general assumption that these projects also induce local development of the affected places, since there is a great influx of social and financial capital brought locally, especially during the construction phase the relationship between hydropower plant implementation s and local development has been controversial in the Environmental Impact Assessment field, and there is no empirical evidence showing how hydroelectric dam construction affects local development. Considering municipal development as a kind of local development and operationalizing the concept of human development by adopting income, longevity and education dimensions defined by Amartya Sen, this study aimed to verify empirical evidences regarding the role of hydropower plants in human development of their flooded municipalities in Brazil. For this, we considered 134 hydroelectric plants and correspondent 641 flooded municipalities, for which 155 human development indicators were obtained for the period of 2000 to 2010. Results obtained from statistical correlation analysis and their assumption tests showed that increases in the municipal flooded area and increases in the period of flooding - to which a given municipality is submitted - were associated with lower performances of human development indicators. Specifically, increases in social inequality, poverty and lower performances of longevity and education were detected for the flooded municipalities. We also found that the financial compensation was associated with better performance of municipal income and lower performances of education and longevity. Finally, approaching the growth poles theory of François Perroux and the productive linkages theory of Albert Hirschman, we suggest that the size of the flooded areas, the flooding period and the financial compensation may lead to an enclave situation in

  11. Path Transmissibility Analysis Considering Two Types of Correlations in Hydropower Stations

    Directory of Open Access Journals (Sweden)

    Baoping Zhi

    2013-01-01

    Full Text Available A new vibration model is built by introducing the head-cover vibration transfer path based on a previous analysis of the vertical vibration model for hydropower station units and powerhouses. This research focuses on disturbance- and parameter-related transfer paths in a practical situation. In a complex situation, the application of the stochastic perturbation method is expanded using an algebra synthesis method the Hadamard product, and theoretical analyses, and numerical simulations of transfer paths in the new vibration model are carried out through the expanded perturbation method. The path transfer force, the path transmissibility, and the path disturbance ranges in the frequency domain are provided. The results indicate that the methods proposed in this study can efficiently reduce the disturbance range and can accurately analyze the transfer paths of hydraulic-source vertical vibration in hydropower stations.

  12. Value-Creation Potential from Multi-Market Trading for a Hydropower Producer

    Directory of Open Access Journals (Sweden)

    Marte Fodstad

    2017-12-01

    Full Text Available We study a hydropower producer’s potential for value-creation from multi-market trading given the price variations in the markets and the flexibility provided through access to hydro reservoirs. We use a perfect foresight optimization model for a price-taking hydropower producer co-optimizing his trades in the day-ahead, intra-day and balancing markets. The model is used on real market data from Norway, Sweden and Germany. The study shows a theoretical potential for added value when selling energy in multiple markets relative to optimal day-ahead sale. Most of this value is achievable also when the perfect foresight is limited to the period from day-ahead bidding until operation. Flexible production plants achieve the largest relative added values for multi-market sales, and has the largest benefit from a long horizon with perfect foresight.

  13. Short-term memory binding deficits in Alzheimer's disease

    OpenAIRE

    Parra, Mario; Abrahams, S.; Fabi, K.; Logie, R.; Luzzi, S.; Della Sala, Sergio

    2009-01-01

    Alzheimer's disease impairs long term memories for related events (e.g. faces with names) more than for single events (e.g. list of faces or names). Whether or not this associative or ‘binding’ deficit is also found in short-term memory has not yet been explored. In two experiments we investigated binding deficits in verbal short-term memory in Alzheimer's disease. Experiment 1 : 23 patients with Alzheimer's disease and 23 age and education matched healthy elderly were recruited. Participants...

  14. Relationship between short-term sexual strategies and sexual jealousy.

    Science.gov (United States)

    Mathes, Eugene W

    2005-02-01

    In a classic study, Buss, Larson, Westen, and Semmelroth reported that men were more distressed by the thought of a partner's sexual infidelity (sexual jealousy) and women were more distressed by the thought of a partner's emotional infidelity (emotional jealousy). Initially, Buss and his associates explained these results by suggesting that men are concerned about uncertainty of paternity, that is, the possibility of raising another man's child while believing the child is their own. However, later they explained the results in terms of men's preference for short-term sexual strategies. The purpose of this research was to test the explanation of short-term sexual strategies. Men and women subjects were instructed to imagine themselves in a relationship which was either short-term (primarily sexual) or long-term (involving commitment) and then respond to Buss's jealousy items. It was hypothesized that, when both men and women imagined a short-term relationship, they would be more threatened by a partner's sexual infidelity, and, when they imagined a long-term relationship, they would be more threatened by a partner's emotional infidelity. Support was found for this hypothesis.

  15. Time of mowing and burning veld: short term effects on production ...

    African Journals Online (AJOL)

    In a comparison of mowing and burning as removal treatments in the Natal Tall Grassveld, mowing proved to be superior to burning in terms of sward productivity in the season following the removal treatment, but burning was responsible for a sward of higher protein content, at least during the early part of the season.

  16. Impact of long-term and short-term therapies on seminal parameters

    Directory of Open Access Journals (Sweden)

    Jlenia Elia

    2013-04-01

    Full Text Available Aim: The aim of this work was: i to evaluate the prevalence of male partners of subfertile couples being treated with long/short term therapies for non andrological diseases; ii to study their seminal profile for the possible effects of their treatments on spermatogenesis and/or epididymal maturation. Methods: The study group was made up of 723 subjects, aged between 25 and 47 years. Semen analysis was performed according to World Health Organization (WHO guidelines (1999. The Superimposed Image Analysis System (SIAS, which is based on the computerized superimposition of spermatozoa images, was used to assess sperm motility parameters. Results: The prevalence of subjects taking pharmacological treatments was 22.7% (164/723. The prevalence was 3.7% (27/723 for the Short-Term Group and 18.9% (137/723 for the Long-Term Group. The subjects of each group were also subdivided into subgroups according to the treatments being received. Regarding the seminal profile, we did not observe a significant difference between the Long-Term, Short-Term or the Control Group. However, regarding the subgroups, we found a significant decrease in sperm number and progressive motility percentage in the subjects receiving treatment with antihypertensive drugs compared with the other subgroups and the Control Group. Conclusions: In the management of infertile couples, the potential negative impact on seminal parameters of any drugs being taken as Long-Term Therapy should be considered. The pathogenic mechanism needs to be clarified.

  17. New construction of the Kelchbach hydropower installation - Preliminary project; Vorprojekt Neubau Kraftwerk Kelchbach. Programm Kleinwasserkraftwerke - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Kalbermatten, J.

    2009-09-15

    This final report for the Swiss Federal Office of Energy (SFOE) describes the preliminary project for the new construction of a small hydropower installation on the Kelchbach stream in Naters, Switzerland. After a pressure-pipe rupture, the old, over 100 year-old installation was closed down. The replacement installation is planned to increase power production. The works necessary for the realisation of this hydropower project are described and discussed. Several older studies on the replacement of the installation are listed. Three variants are presented and discussed as are hydrological data on the project. Cost estimates are presented and discussed. Estimates of energy production are also presented and discussed, as is the economic viability of the project. Environmental aspects of the project are also examined.

  18. Framing hydropower as green energy: assessing drivers, risks and tensions in the Eastern Himalayas

    NARCIS (Netherlands)

    Ahlers, R.; Budds, J.; Joshi, D.; Merme, V.; Zwarteveen, M.

    2015-01-01

    The culturally and ecologically diverse region of the Eastern Himalayas is the target of ambitious hydropower development plans. Policy discourses at national and international levels position this development as synergistically positive: it combines the production of clean energy to fuel economic

  19. Framing hydropower as green energy: assessing drivers, risks and tensions in the Eastern Himalayas

    NARCIS (Netherlands)

    Ahlers, R.; Budds, J.; Joshi, D.; Merme, V.; Zwarteveen, M.Z.

    2014-01-01

    The culturally and ecologically diverse region of the Eastern Himalayas is the target of ambitious hydropower development plans. Policy discourses at national and international levels position this development as synergistically positive: it combines the production of clean energy to fuel economic

  20. Model documentation report: Short-Term Hydroelectric Generation Model

    International Nuclear Information System (INIS)

    1993-08-01

    The purpose of this report is to define the objectives of the Short- Term Hydroelectric Generation Model (STHGM), describe its basic approach, and to provide details on the model structure. This report is intended as a reference document for model analysts, users, and the general public. Documentation of the model is in accordance with the Energy Information Administration's (AYE) legal obligation to provide adequate documentation in support of its models (Public Law 94-385, Section 57.b.2). The STHGM performs a short-term (18 to 27- month) forecast of hydroelectric generation in the United States using an autoregressive integrated moving average (UREMIA) time series model with precipitation as an explanatory variable. The model results are used as input for the short-term Energy Outlook

  1. Renewable energy in pakistan: part-II mini/micro hydropower plants

    International Nuclear Information System (INIS)

    Maher, M.J.

    2005-01-01

    Part-1 of this series dealt with Wind-Energy Prospects in Pakistan. This second part gives a brief account Mini/Micro Hydro-Power Plants in Pakistan. Hydropower is well-known throughout the world and currently contributes 6-7% of total world energy-production and 20% of total world electricity generation. Most of the hydro-plants are usually designed for higher generation capacity than that which could be needed to utilize the average water-flows. Small hydro-plants are another potential source of energy among the non-conventional energy sources, which can reduce the load on conventional-energy production. Small hydropower technology is today a mature and proven technology. Civil works and installation of equipment involve simple process, which offer good opportunity to local people for employment and use locally available materials Nevertheless a small decentralized hydel plant, based on natural waterfalls is a very desirable option for geographically remote, but naturally suitable locations which are otherwise far from the national physical infrastructure. The development of Mini/Micro hydel stations in these areas, with isolated, thinly clustered, population, is a very appropriate solution to meet power-needs of such areas for lighting as well as cottage industry. The unique feature of these installations is the participation of local community to the optimum extent. The entire civil works, the intake system, power channel, forebay, penstock and power house building, as well as labour is provided by the inhabitants voluntarily. While maximum use is made of stone, with minimum use of cement, the generator, distribution wires, etc., need to be arranged from the market. The turbine is manufactured using indigenous materials. The installation-cost per KW is relatively low i.e. Rs. 25,000/- as compared to large-scale installations. There could of course be variations, in the installation-cost, depending on the market prices of the material. (author)

  2. Export of Norwegian hydropower under a common European regime of environmental taxes

    International Nuclear Information System (INIS)

    Amundsen, E.S.; Bjoerndalen, J. Rasmussen, H.

    1994-01-01

    This paper sets out to investigate the strategic position of Norwegian hydropower and, in particular, to study optimal decisions with respect to the installation of new export transmission lines. For this purpose an integrated long-run equilibrium model for the northern European electricity market determining production, consumption and trade is constructed. (author)

  3. Short-term flow induced crystallization in isotactic polypropylene : how short is short?

    NARCIS (Netherlands)

    Ma, Z.; Balzano, L.; Portale, G.; Peters, G.W.M.

    2013-01-01

    The so-called "short-term flow" protocol is widely applied in experimental flow-induced crystallization studies on polymers in order to separate the nucleation and subsequent growth processes [Liedauer et al. Int. Polym. Proc. 1993, 8, 236–244]. The basis of this protocol is the assumption that

  4. Hydropower systems planning in distribution networks based on GIS

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez-Rosado, I.J.; Zorzano-Santamaria, P.; Fernandez-Jiminez, L.A.; Garcia-Garrido, E.; Zorzano-Alba, E.; Lara-Santillan, P.M.; Mendoza-Villena, M. [La Rioja Univ., La Rioja (Spain). Dept. of Electrical Engineering

    2005-07-01

    Planning models for hydraulic energy systems developed with a new computational geographic information system (GIS) tool were presented. The GIS tool was used to identify sections of rivers that are suitable for small-scale run-of-river hydropower generation in the La Rioja region of Spain. The tool was also used to evaluate economic data related to financing grants, technological costs, installation costs, and forecast demands for various consumption scenarios. Case studies of 2 hydropower systems were used to test the tool. The planning models were based on levelized electric costs (LEC) of run-of-river hydropower systems, and enabled the systems to be analyzed in isolation as well as when connected to an existing electricity network. Results of the modelling studies showed that the tool is capable of analyzing the LEC of potential hydropower systems in a range of different scenarios while maintaining the geographic characteristics and requirements of individual regions. 7 refs., 4 figs.

  5. Comparison of Short Term with Long Term Catheterization after Anterior Colporrhaphy Surgery

    Directory of Open Access Journals (Sweden)

    F. Movahed

    2010-07-01

    Full Text Available Introduction & Objective: This belief that overfilling the bladder after anterior colporrhaphy might have a negative influence on surgical outcome, causes routine catheterization after operation. This study was done to compare short term (24h with long term (72h catheterization after anterior colporrhaphy.Materials & Methods: This randomized clinical trial was carried out at Kosar Hospital , Qazvin (Iran in 2005-2006. One hundred cases candidating for anterior colporrhaphy , were divided in two equal groups . In the first group foley catheter was removed 24 hours and in the second group 72 hours after the operation. Before removing catheter, urine sample was obtained for culture . After removal and urination, residual volume was determinded. If the volume exceeded 200 ml or retention occured, the catheter would be fixed for more 72 hours. Need for recatheterization, urinary retention, positive urine culture,and hospital stay were surveyed. The data was analyzed using T and Fisher tests.Results: Residual volume exceeding 200 ml and the need for recatheterization occurred in one case (2% in the short term group but in the long term group none of the subjects needed recatheterization (P=1. Retention was not seen. In the both groups, one case (2% had positive urine culture with no statistically significant difference (P=1. Mean hospital stay was short in the first group (P=0.00.Conclusion: Short term catheterization after anterior colporrhaphy does not cause urinary retention and decreases hospital stay.

  6. Hydropower: Partnership with the Environment

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-06-01

    This brochure provides useful information on types of hydroelectric facilities as well as general information on capacity, generation, environmental issues, and advanced conventional hydropower technology within the United States.

  7. Short-Term Group Treatment for Adult Children of Alcoholics.

    Science.gov (United States)

    Cooper, Alvin; McCormack, WIlliam A.

    1992-01-01

    Adult children of alcoholics (n=24) were tested on measures of loneliness, anxiety, hostility, depression, and interpersonal dependency before and after participation in short-term group therapy. Highly significant test score changes supported effectiveness of individual therapy in short-term groups. (Author/NB)

  8. Frequency-specific insight into short-term memory capacity

    OpenAIRE

    Feurra, Matteo; Galli, Giulia; Pavone, Enea Francesco; Rossi, Alessandro; Rossi, Simone

    2016-01-01

    We provided novel evidence of a frequency-specific effect by transcranial alternating current stimulation (tACS) of the left posterior parietal cortex on short-term memory, during a digit span task. the effect was prominent with stimulation at beta frequency for young and not for middle-aged adults and correlated with age. Our findings highlighted a short-term memory capacity improvement by tACS application.

  9. Ecotoxicological evaluation of the short term effects of fresh and stabilized textile sludges before application in forest soil restoration

    International Nuclear Information System (INIS)

    Rosa, Edson V.C.; Giuradelli, Thayse M.; Correa, Albertina X.R.; Roerig, Leonardo R.; Schwingel, Paulo R.; Resgalla, Charrid; Radetski, Claudemir M.

    2007-01-01

    The short term (eco)toxicity potential of fresh and stabilized textile sludges, as well as the short term (eco)toxicity of leachates obtained from both fresh and stabilized textile sludges, was evaluated by a battery of toxicity tests carried out with bacteria, algae, daphnids, fish, earthworms, and higher plants. The (eco)toxicological results showed that, after 120 d of stabilization, the experimental loading ratio of 25% sludge:75% soil (v/v) (equivalent to 64.4 ton/ha) did not significantly increase toxicity effects and increased significantly the biomass yield for earthworms and higher plants. The rank of biological sensitivity endpoints was: Algae ∼ Plant biomass > Plant germination ∼ Daphnids > Bacteria ∼ Fish > Annelids. The lack of short term toxicity effects and the stimulant effect observed with higher plants and earthworms are good indications of the fertilizer/conditioner potential of this industrial waste, which after stabilization can be used in the restoration of a non-productive forest soil. - Short term ecotoxicity evaluation of textile sludge showed that stabilized sludge can be used in the restoration of a non-productive forest soil

  10. Reconciling long-term cultural diversity and short-term collective social behavior.

    Science.gov (United States)

    Valori, Luca; Picciolo, Francesco; Allansdottir, Agnes; Garlaschelli, Diego

    2012-01-24

    An outstanding open problem is whether collective social phenomena occurring over short timescales can systematically reduce cultural heterogeneity in the long run, and whether offline and online human interactions contribute differently to the process. Theoretical models suggest that short-term collective behavior and long-term cultural diversity are mutually excluding, since they require very different levels of social influence. The latter jointly depends on two factors: the topology of the underlying social network and the overlap between individuals in multidimensional cultural space. However, while the empirical properties of social networks are intensively studied, little is known about the large-scale organization of real societies in cultural space, so that random input specifications are necessarily used in models. Here we use a large dataset to perform a high-dimensional analysis of the scientific beliefs of thousands of Europeans. We find that interopinion correlations determine a nontrivial ultrametric hierarchy of individuals in cultural space. When empirical data are used as inputs in models, ultrametricity has strong and counterintuitive effects. On short timescales, it facilitates a symmetry-breaking phase transition triggering coordinated social behavior. On long timescales, it suppresses cultural convergence by restricting it within disjoint groups. Moreover, ultrametricity implies that these results are surprisingly robust to modifications of the dynamical rules considered. Thus the empirical distribution of individuals in cultural space appears to systematically optimize the coexistence of short-term collective behavior and long-term cultural diversity, which can be realized simultaneously for the same moderate level of mutual influence in a diverse range of online and offline settings.

  11. An empirical analysis of the hydropower portfolio in Pakistan

    International Nuclear Information System (INIS)

    Siddiqi, Afreen; Wescoat, James L.; Humair, Salal; Afridi, Khurram

    2012-01-01

    The Indus Basin of Pakistan with 800 hydropower project sites and a feasible hydropower potential of 60 GW, 89% of which is undeveloped, is a complex system poised for large-scale changes in the future. Motivated by the need to understand future impacts of hydropower alternatives, this study conducted a multi-dimensional, empirical analysis of the full hydropower portfolio. The results show that the full portfolio spans multiple scales of capacity from mega (>1000 MW) to micro (<0.1 MW) projects with a skewed spatial distribution within the provinces, as well as among rivers and canals. Of the total feasible potential, 76% lies in two (out of six) administrative regions and 68% lies in two major rivers (out of more than 125 total channels). Once projects currently under implementation are commissioned, there would be a five-fold increase from a current installed capacity of 6720 MW to 36759 MW. It is recommended that the implementation and design decisions should carefully include spatial distribution and environmental considerations upfront. Furthermore, uncertainties in actual energy generation, and broader hydrological risks due to expected climate change effects should be included in the current planning of these systems that are to provide service over several decades into the future. - Highlights: ► Pakistan has a hydropower potential of 60 GW distributed across 800 projects. ► Under-development projects will realize 36.7 GW of this potential by 2030. ► Project locations are skewed towards some sub-basins and provinces. ► Project sizes are very diverse and have quite limited private sector ownership. ► Gaps in data prevent proper risk assessment for Pakistan's hydropower development.

  12. Environmental-impact assessment of hydro-power in Egypt

    International Nuclear Information System (INIS)

    Rashad, S.M.; Ismail, M.A.

    2000-01-01

    The environmental impact of energy production and use with the associated emissions of greenhouse gases, particularly CO 2 , has created much attention and growing concern at both national and international levels. In Egypt, efforts have been directed to incorporate the environment-protection issues within the overall planning of the energy sector, as appropriate to its national commitment and its techno-economic considerations. Over the past decade, 1985-1995, hydro-power had contributed between 28 and 22% of the total energy produced by Egyptian power-plants, while the contribution of the hydro capacity was between 32.4 and 21.5%. Many studies have been carried out on the impacts of the Aswan High Dam on various aspects of the environment. An objective evaluation of the Dam, based on 25 years of operational data, indicated that it has overall been positive even though it has contributed to some environmental problems. These problems, however, are significantly less than most people originally expected. This paper deals with the review and analysis of the detrimental effects of hydro-power in Egypt. An evaluation will be given of the emissions of greenhouse gases from the whole hydro-chain. (Author)

  13. Accelerating Sustainability by Hydropower Development in China: The Story of HydroLancang

    Directory of Open Access Journals (Sweden)

    Yan Zhang

    2017-07-01

    Full Text Available Sustainable development is a shared responsibility. Accelerating sustainability of water–energy–people nexus and building a common awareness of issues pertaining to sustainable development are essential for any sort of success in this direction. Hydropower has been a useful sustainable energy for development, yet highly controversial. This paper reviews the overall situation of hydropower development and China’s energy reforms and policies, accompanied with a case study of hydropower development the Lancang River by the HydroLancang, aiming to illustrate the two opposite sides of hydropower development—economy and environment. The paper concludes with a neutral view of hydropower as the necessary facilitator for development. Water is a shared responsibility. Hydropower might not be the optimum solution to eliminate the tension between human demand of energy and finite natural resource and the rising pressure of climate change worldwide, but it serves well as an “Electricity Bridge” before better alternatives become available. This is a more balanced view of hydropower rather than two extreme viewpoints that present themselves: on the one hand, exaggerated claims of the human power to tame the wild river, and, on the other hand, the idealistic fantasy of preserving nature by abandoning all human activity.

  14. Differences in health status between long-term and short-term benzodiazepine users.

    NARCIS (Netherlands)

    Zandstra, S.M.; Furer, J.W.; Lisdonk, E.H. van de; Bor, J.H.J.; Zitman, F.G.; Weel, C. van

    2002-01-01

    BACKGROUND: Despite generally accepted advice to keep treatment short, benzodiazepines are often prescibed for more than six months. Prevention of long-term benzodiazepine use could be facilitated by the utilisation of risk indicators for long-term use. However, the characteristics of long-term

  15. The roles of long-term phonotactic and lexical prosodic knowledge in phonological short-term memory.

    Science.gov (United States)

    Tanida, Yuki; Ueno, Taiji; Lambon Ralph, Matthew A; Saito, Satoru

    2015-04-01

    Many previous studies have explored and confirmed the influence of long-term phonological representations on phonological short-term memory. In most investigations, phonological effects have been explored with respect to phonotactic constraints or frequency. If interaction between long-term memory and phonological short-term memory is a generalized principle, then other phonological characteristics-that is, suprasegmental aspects of phonology-should also exert similar effects on phonological short-term memory. We explored this hypothesis through three immediate serial-recall experiments that manipulated Japanese nonwords with respect to lexical prosody (pitch-accent type, reflecting suprasegmental characteristics) as well as phonotactic frequency (reflecting segmental characteristics). The results showed that phonotactic frequency affected the retention not only of the phonemic sequences, but also of pitch-accent patterns, when participants were instructed to recall both the phoneme sequence and accent pattern of nonwords. In addition, accent pattern typicality influenced the retention of the accent pattern: Typical accent patterns were recalled more accurately than atypical ones. These results indicate that both long-term phonotactic and lexical prosodic knowledge contribute to phonological short-term memory performance.

  16. Dynamical nexus of water supply, hydropower and environment based on the modeling of multiple socio-natural processes: from socio-hydrological perspective

    Science.gov (United States)

    Liu, D.; Wei, X.; Li, H. Y.; Lin, M.; Tian, F.; Huang, Q.

    2017-12-01

    In the socio-hydrological system, the ecological functions and environmental services, which are chosen to maintain, are determined by the preference of the society, which is making the trade-off among the values of riparian vegetation, fish, river landscape, water supply, hydropower, navigation and so on. As the society develops, the preference of the value will change and the ecological functions and environmental services which are chosen to maintain will change. The aim of the study is to focus on revealing the feedback relationship of water supply, hydropower and environment and the dynamical feedback mechanism at macro-scale, and to establish socio-hydrological evolution model of the watershed based on the modeling of multiple socio-natural processes. The study will aim at the Han River in China, analyze the impact of the water supply and hydropower on the ecology, hydrology and other environment elements, and study the effect on the water supply and hydropower to ensure the ecological and environmental water of the different level. Water supply and ecology are usually competitive. In some reservoirs, hydropower and ecology are synergic relationship while they are competitive in some reservoirs. The study will analyze the multiple mechanisms to implement the dynamical feedbacks of environment to hydropower, set up the quantitative relationship description of the feedback mechanisms, recognize the dominant processes in the feedback relationships of hydropower and environment and then analyze the positive and negative feedbacks in the feedback networks. The socio-hydrological evolution model at the watershed scale will be built and applied to simulate the long-term evolution processes of the watershed of the current situation. Dynamical nexus of water supply, hydropower and environment will be investigated.

  17. Valuing the effects of hydropower development on watershed ecosystem services: Case studies in the Jiulong River Watershed, Fujian Province, China

    Science.gov (United States)

    Wang, Guihua; Fang, Qinhua; Zhang, Luoping; Chen, Weiqi; Chen, Zhenming; Hong, Huasheng

    2010-02-01

    Hydropower development brings many negative impacts on watershed ecosystems which are not fully integrated into current decision-making largely because in practice few accept the cost and benefit beyond market. In this paper, a framework was proposed to valuate the effects on watershed ecosystem services caused by hydropower development. Watershed ecosystem services were classified into four categories of provisioning, regulating, cultural and supporting services; then effects on watershed ecosystem services caused by hydropower development were identified to 21 indicators. Thereafter various evaluation techniques including the market value method, opportunity cost approach, project restoration method, travel cost method, and contingent valuation method were determined and the models were developed to valuate these indicators reflecting specific watershed ecosystem services. This approach was applied to three representative hydropower projects (Daguan, Xizaikou and Tiangong) of Jiulong River Watershed in southeast China. It was concluded that for hydropower development: (1) the value ratio of negative impacts to positive benefits ranges from 64.09% to 91.18%, indicating that the negative impacts of hydropower development should be critically studied during its environmental administration process; (2) the biodiversity loss and water quality degradation (together accounting for 80-94%) are the major negative impacts on watershed ecosystem services; (3) the average environmental cost per unit of electricity is up to 0.206 Yuan/kW h, which is about three quarters of its on-grid power tariff; and (4) the current water resource fee accounts for only about 4% of its negative impacts value, therefore a new compensatory method by paying for ecosystem services is necessary for sustainable hydropower development. These findings provide a clear picture of both positive and negative effects of hydropower development for decision-makers in the monetary term, and also provide a

  18. Short-Term Effects of Drying-Rewetting and Long-Term Effects of Nutrient Loading on Periphyton N:P Stoichiometry

    Directory of Open Access Journals (Sweden)

    Andres D. Sola

    2018-01-01

    Full Text Available Nitrogen (N and phosphorus (P concentrations and N:P ratios critically influence periphyton productivity and nutrient cycling in aquatic ecosystems. In coastal wetlands, variations in hydrology and water source (fresh or marine influence nutrient availability, but short-term effects of drying and rewetting and long-term effects of nutrient exposure on periphyton nutrient retention are uncertain. An outdoor microcosm experiment simulated short-term exposure to variation in drying-rewetting frequency on periphyton mat nutrient retention. A 13-year dataset from freshwater marshes of the Florida Everglades was examined for the effect of long-term proximity to different N and P sources on mat-forming periphyton nutrient standing stocks and stoichiometry. Field sites were selected from one drainage with shorter hydroperiod and higher connectivity to freshwater anthropogenic nutrient supplies (Taylor Slough/Panhandle, TS/Ph and another drainage with longer hydroperiod and higher connectivity to marine nutrient supplies (Shark River Slough, SRS. Total P, but not total N, increased in periphyton mats exposed to both low and high drying-rewetting frequency with respect to the control mats in our experimental microcosm. In SRS, N:P ratios slightly decreased downstream due to marine nutrient supplies, while TS/Ph increased. Mats exposed to short-term drying-rewetting had higher nutrient retention, similar to nutrient standing stocks from long-term field data. Periphyton mat microbial communities may undergo community shifts upon drying-rewetting and chronic exposure to nutrient loads. Additional work on microbial species composition may further explain how periphyton communities interact with drying-rewetting dynamics to influence nutrient cycling and retention in wetlands.

  19. Visual Short-Term Memory Complexity

    DEFF Research Database (Denmark)

    Sørensen, Thomas Alrik

    Several recent studies have explored the nature and limits of visual short-term memory (VSTM) (e.g. Luck & Vogel, 1997). A general VSTM capacity limit of about 3 to 4 letters has been found, thus confirming results from earlier studies (e.g. Cattell, 1885; Sperling, 1960). However, Alvarez...

  20. Brain oscillatory substrates of visual short-term memory capacity.

    Science.gov (United States)

    Sauseng, Paul; Klimesch, Wolfgang; Heise, Kirstin F; Gruber, Walter R; Holz, Elisa; Karim, Ahmed A; Glennon, Mark; Gerloff, Christian; Birbaumer, Niels; Hummel, Friedhelm C

    2009-11-17

    The amount of information that can be stored in visual short-term memory is strictly limited to about four items. Therefore, memory capacity relies not only on the successful retention of relevant information but also on efficient suppression of distracting information, visual attention, and executive functions. However, completely separable neural signatures for these memory capacity-limiting factors remain to be identified. Because of its functional diversity, oscillatory brain activity may offer a utile solution. In the present study, we show that capacity-determining mechanisms, namely retention of relevant information and suppression of distracting information, are based on neural substrates independent of each other: the successful maintenance of relevant material in short-term memory is associated with cross-frequency phase synchronization between theta (rhythmical neural activity around 5 Hz) and gamma (> 50 Hz) oscillations at posterior parietal recording sites. On the other hand, electroencephalographic alpha activity (around 10 Hz) predicts memory capacity based on efficient suppression of irrelevant information in short-term memory. Moreover, repetitive transcranial magnetic stimulation at alpha frequency can modulate short-term memory capacity by influencing the ability to suppress distracting information. Taken together, the current study provides evidence for a double dissociation of brain oscillatory correlates of visual short-term memory capacity.

  1. SHORT-TERM MEMORY IS INDEPENDENT OF BRAIN PROTEIN SYNTHESIS

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Hasker P.; Rosenzweig, Mark R.; Jones, Oliver W.

    1980-09-01

    Male Swiss albino CD-1 mice given a single injection of a cerebral protein synthesis inhibitor, anisomycin (ANI) (1 mg/animal), 20 min prior to single trial passive avoidance training demonstrated impaired retention at tests given 3 hr, 6 hr, 1 day, and 7 days after training. Retention was not significantly different from saline controls when tests were given 0.5 or 1.5 hr after training. Prolonging inhibition of brain protein synthesis by giving either 1 or 2 additional injections of ANI 2 or 2 and 4 hr after training did not prolong short-term retention performance. The temporal development of impaired retention in ANI treated mice could not be accounted for by drug dosage, duration of protein synthesis inhibition, or nonspecific sickness at test. In contrast to the suggestion that protein synthesis inhibition prolongs short-term memory (Quinton, 1978), the results of this experiment indicate that short-term memory is not prolonged by antibiotic drugs that inhibit cerebral protein synthesis. All evidence seems consistent with the hypothesis that short-term memory is protein synthesis independent and that the establishment of long-term memory depends upon protein synthesis during or shortly after training. Evidence for a role of protein synthesis in memory maintenance is discussed.

  2. Should we build more large dams? The actual costs of hydropower megaproject development

    International Nuclear Information System (INIS)

    Ansar, Atif; Flyvbjerg, Bent; Budzier, Alexander; Lunn, Daniel

    2014-01-01

    A brisk building boom of hydropower mega-dams is underway from China to Brazil. Whether benefits of new dams will outweigh costs remains unresolved despite contentious debates. We investigate this question with the “outside view” or “reference class forecasting” based on literature on decision-making under uncertainty in psychology. We find overwhelming evidence that budgets are systematically biased below actual costs of large hydropower dams—excluding inflation, substantial debt servicing, environmental, and social costs. Using the largest and most reliable reference data of its kind and multilevel statistical techniques applied to large dams for the first time, we were successful in fitting parsimonious models to predict cost and schedule overruns. The outside view suggests that in most countries large hydropower dams will be too costly in absolute terms and take too long to build to deliver a positive risk-adjusted return unless suitable risk management measures outlined in this paper can be affordably provided. Policymakers, particularly in developing countries, are advised to prefer agile energy alternatives that can be built over shorter time horizons to energy megaprojects. - Highlights: • We investigate ex post outcomes of schedule and cost estimates of hydropower dams. • We use the “outside view” based on Kahneman and Tversky's research in psychology. • Estimates are systematically and severely biased below actual values. • Projects that take longer have greater cost overruns; bigger projects take longer. • Uplift required to de-bias systematic cost underestimation for large dams is +99%

  3. Insensitivity of visual short-term memory to irrelevant visual information.

    Science.gov (United States)

    Andrade, Jackie; Kemps, Eva; Werniers, Yves; May, Jon; Szmalec, Arnaud

    2002-07-01

    Several authors have hypothesized that visuo-spatial working memory is functionally analogous to verbal working memory. Irrelevant background speech impairs verbal short-term memory. We investigated whether irrelevant visual information has an analogous effect on visual short-term memory, using a dynamic visual noise (DVN) technique known to disrupt visual imagery (Quinn & McConnell, 1996b). Experiment I replicated the effect of DVN on pegword imagery. Experiments 2 and 3 showed no effect of DVN on recall of static matrix patterns, despite a significant effect of a concurrent spatial tapping task. Experiment 4 showed no effect of DVN on encoding or maintenance of arrays of matrix patterns, despite testing memory by a recognition procedure to encourage visual rather than spatial processing. Serial position curves showed a one-item recency effect typical of visual short-term memory. Experiment 5 showed no effect of DVN on short-term recognition of Chinese characters, despite effects of visual similarity and a concurrent colour memory task that confirmed visual processing of the characters. We conclude that irrelevant visual noise does not impair visual short-term memory. Visual working memory may not be functionally analogous to verbal working memory, and different cognitive processes may underlie visual short-term memory and visual imagery.

  4. The political feasibility of Norway as the ‘green battery’ of Europe

    International Nuclear Information System (INIS)

    Gullberg, Anne Therese

    2013-01-01

    Norway has great potential for producing pumped-storage hydropower, and the European Union (EU) hope Norway can contribute to Europe's transition to a renewable energy system by serving as a ‘green battery’. This is certainly technically feasible. However, this paper asks whether the green battery idea is politically feasible. The paper analyses four scenarios, three of which Norway serves as a green battery and one domestic. It focuses on decision-makers' and interest groups' positions on new interconnectors from Norway to continental Europe and the United Kingdom (UK), pumped-storage hydropower, and new renewable energy production in Norway. The paper argues that the present policy is characterised by incremental change—decisions about new interconnectors are made on an individual basis. Moreover the paper argues there is little reason to believe that this status quo policy will change based on any of the green battery scenarios in the near term. Still, decision-makers and interest groups are positive, in principle, towards new interconnectors and pumped-storage hydropower. Hence, Norway might become a green battery in the longer term. In the short term, however, a politically feasible contribution from Norway is balancing power through already existing hydropower capacity. - Highlights: ► Norwegian status quo policy is characterised by incremental change. ► Status quo is no likely to be replaced by a green battery scenario in the short term. ► Norway might become the green battery of Europe in the longer term

  5. 77 FR 51551 - Proposed Renewal of Information Collection: Alternatives Process in Hydropower Licensing

    Science.gov (United States)

    2012-08-24

    ...: Alternatives Process in Hydropower Licensing AGENCY: Office of the Secretary, Office of Environmental Policy... approval for the collection of information for Alternatives Process in Hydropower Licensing. This... comments should reference Alternatives Process in Hydropower Licensing. FOR FURTHER INFORMATION CONTACT: To...

  6. Renewable energy in the Baltic countries: the case of hydropower

    International Nuclear Information System (INIS)

    Punys, P.; Dumbrauskas, A.; Rimkus, Z.; Streimikiene, D.

    2006-01-01

    This paper analyses the use of renewable energy sources (RES) dedicated mainly for electricity generation in the Baltic countries (Estonia, Latvia and Lithuania). Hydropower sector including both large (medium) and small power plants is particularly considered. The region has very limited energy resources of its own and is heavily dependent on the import of the primary energy sources (in some way except Estonia). The main objective of energy policy of the Baltic countries is to reduce such a total dependence by favouring the use of RES. A brief description of energy sector is given, focusing on electricity generation. RES potential currently in use and to be exploited in the future, buy- back rates of the key sources are presented. The countries' target broken down according to the individual RES to meet the EU 'green' electricity directive (2001/77/CE) are presented. Small and large hydropower potential is analyzed, a general overview of hydro-plants in operation and planned schemes is provided. A particular attention is devoted to environmental and social aspects of hydropower development. The requirements of the protected areas in relation to dam construction are analyzed, an estimation of resistance to small hydropower development is shown. The environmental legislation including forbidden rivers for damming actually in force in the Baltic countries is considered; hydropower image perceptible by general public, NGOs and official environmental bodies are discussed. The causes and legal basis of the promulgation of the list of forbidden rivers are revealed. A conclusion is drawn that the contradiction between two EU legal frameworks - environmental protection and promotion of renewables, in the case of hydropower, exists. The evaluation of the quantitative impact of the forbidden rivers on small hydropower resources in Lithuania proves. the environmental legislation is one of the strictest in the European countries. (authors)

  7. The potential micro-hydropower projects in Nakhon Ratchasima province, Thailand

    International Nuclear Information System (INIS)

    Kosa, Preeyaphorn; Chinkulkijniwat, Avirut; Horpibulsuk, Suksun; Kulworawanichpong, Thanatchai; Srivoramas, Rerkchai; Teaumroong, Neung

    2011-01-01

    At present, fossil fuel energy is commonly used in developing countries, including Thailand. The tendency to use fossil fuel energy is continuously increasing, and the price of fossil fuels is rising. Thus, renewable energy is of interest. Hydropower is one of the oldest renewable energy forms known and one of the best solutions for providing electricity to rural communities. The present paper aims to determine the potential micro-hydropower sites that could provide more than 50 kW but not over 10 MW in Nakhon Ratchasima Province, Thailand. Both reservoir and run-of-the-river schemes are considered for the assessment of potential micro-hydropower sites. For the reservoir scheme, the discharge in the reservoir is employed for generating micro-hydropower electricity. This installation can be carried out without major modifications to the dam. The run-of-the-river scheme diverts water flow from the river mainstream to the intake via a pressure pipe or an open canal, which is then conveyed to the turbine via a penstock to generate electricity. The results showed that there are 6 suitable projects for the reservoir scheme and 11 suitable projects for the run-of-the-river. The maximum power load was 6000 kW and 320 kW for the reservoir and the run-of-the-river schemes, respectively. Hydropower from the run-of-the-river scheme is more suitable than hydropower from the reservoir scheme because of the many mountains in this province. The designed head for the run-of-the-river scheme is thus generally higher than that for the reservoir scheme. Because stream flow during the dry season is very low, electricity can only be produced in the wet season. This research is a pilot study to determine the potential sites of micro-hydropower projects. (author)

  8. Remembering over the short-term: the case against the standard model.

    Science.gov (United States)

    Nairne, James S

    2002-01-01

    Psychologists often assume that short-term storage is synonymous with activation, a mnemonic property that keeps information in an immediately accessible form. Permanent knowledge is activated, as a result of on-line cognitive processing, and an activity trace is established "in" short-term (or working) memory. Activation is assumed to decay spontaneously with the passage of time, so a refreshing process-rehearsal-is needed to maintain availability. Most of the phenomena of immediate retention, such as capacity limitations and word length effects, are assumed to arise from trade-offs between rehearsal and decay. This "standard model" of how we remember over the short-term still enjoys considerable popularity, although recent research questions most of its main assumptions. In this chapter I review the recent research and identify the empirical and conceptual problems that plague traditional conceptions of short-term memory. Increasingly, researchers are recognizing that short-term retention is cue driven, much like long-term memory, and that neither rehearsal nor decay is likely to explain the particulars of short-term forgetting.

  9. Gummed-up memory: chewing gum impairs short-term recall.

    Science.gov (United States)

    Kozlov, Michail D; Hughes, Robert W; Jones, Dylan M

    2012-01-01

    Several studies have suggested that short-term memory is generally improved by chewing gum. However, we report the first studies to show that chewing gum impairs short-term memory for both item order and item identity. Experiment 1 showed that chewing gum reduces serial recall of letter lists. Experiment 2 indicated that chewing does not simply disrupt vocal-articulatory planning required for order retention: Chewing equally impairs a matched task that required retention of list item identity. Experiment 3 demonstrated that manual tapping produces a similar pattern of impairment to that of chewing gum. These results clearly qualify the assertion that chewing gum improves short-term memory. They also pose a problem for short-term memory theories asserting that forgetting is based on domain-specific interference given that chewing does not interfere with verbal memory any more than tapping. It is suggested that tapping and chewing reduce the general capacity to process sequences.

  10. A Short Term Analogue Memory

    DEFF Research Database (Denmark)

    Shah, Peter Jivan

    1992-01-01

    A short term analogue memory is described. It is based on a well-known sample-hold topology in which leakage currents have been minimized partly by circuit design and partly by layout techniques. Measurements on a test chip implemented in a standard 2.4 micron analogue CMOS process show a droop...

  11. Short-Term Success versus Long-Term Failure: A Simulation-Based Approach for Understanding the Potential of Zambia’s Fertilizer Subsidy Program in Enhancing Maize Availability

    Directory of Open Access Journals (Sweden)

    Andreas Gerber

    2016-10-01

    Full Text Available In Sub-Saharan Africa, food-related policies such as fertilizer subsidy programs (FSPs have undergone a revival and triggered a controversy about their impact. In this article I applied a simulation-based approach to examine the FSPs’ short- and long-term potential for increasing maize availability in Zambia. The study revealed that FSPs are an effective policy measure to enhance maize availability in the short-term. However, in the long-term, the food system becomes dependent on the government’s annual expenses. The dependency occurs because FSPs fail to build up adequate stock levels of soil organic matter (SOM, which is an important source of resilience and productivity, and thus represents a long-term leverage point in Zambia’s maize production system. For this reason, alternative policies that combine increasing productivity and building up SOM stock levels were analyzed. They were found to be a viable means for enhancing long-term maize availability. The study concludes that gradually reducing investments in FSPs while simultaneously promoting farming practices that build up SOM stock levels is a promising strategy to enhance maize availability sustainably.

  12. 77 FR 30308 - Proposed Renewal of Information Collection: Alternatives Process in Hydropower Licensing

    Science.gov (United States)

    2012-05-22

    ...: Alternatives Process in Hydropower Licensing AGENCY: Office of the Secretary, Office of Environmental Policy... the Alternatives Process in Hydropower Licensing, OMB Control Number 1094-0001. FOR FURTHER... more of the Departments develop for inclusion in a hydropower license issued by the Federal Energy...

  13. Modelling the feasibility of retrofitting hydropower to existing South ...

    African Journals Online (AJOL)

    An investigation was carried out with the primary objective of ascertaining whether it is possible to develop a model for determining the feasibility of retrofitting hydropower to existing dams in South Africa. The need for such a model is primarily due to the growing importance of small-scale hydropower projects resulting from ...

  14. 75 FR 65620 - Inglis Hydropower, LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Science.gov (United States)

    2010-10-26

    ... Hydropower, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments...: Inglis Hydropower, LLC. e. Name of Project: Inglis Hydropower Project. f. Location: The project would be... ready for environmental analysis at this time. l. The proposed 2.0-megawatt Inglis Hydropower Project...

  15. Rethinking Pumped Storage Hydropower in the European Alps: A Call for New Integrated Assessment Tools to Support the Energy Transition

    Directory of Open Access Journals (Sweden)

    Astrid Björnsen Gurung

    2016-05-01

    Full Text Available The European Alps are well positioned to contribute significantly to the energy transition. In addition to sites with above-average potential for wind and solar power, the “water towers” of Europe provide flexible, low-carbon power generation as well as energy storage. In the future, hydropower systems are expected to become more than mere electricity generators, serving a key role as flexible complements to intermittent power generators and as providers of large-scale seasonal and daily energy storage. Energy transition on national and European scales can be facilitated by expanding the capacity of pumped storage hydropower (PSHP plants. Yet the extension of hydropower production, in particular PSHP, remains controversial, primarily due to environmental concerns. Focusing on 2 Alpine countries, Austria and Switzerland, this paper provides a system view of hydropower production and energy storage in the Alps. It discusses advantages and drawbacks of various assessment tools and identifies gaps and needs for the integrated assessment of PSHP plants. It concludes that instruments that evaluate the impacts and sustainability of PSHP projects need to be developed, elaborated, and applied in a participatory manner, in order to promote public dialogue, increase social acceptance, and, ideally, encourage energy consumers to become advocates of a sustainable energy future.

  16. Short-term Canadian natural gas deliverability 2005-2007 : an energy market assessment

    International Nuclear Information System (INIS)

    2005-10-01

    This document examined the factors that influence gas supply in the short-term and presented an outlook for deliverability from 2005 to 2007. Recent trends in the production characteristics of the Western Canada Sedimentary Basin (WCSB) and the east coast offshore provide a better understanding of the short-term gas supply situation. High natural gas prices have resulted in record levels of drilling in Canada's natural gas exploration and production industry. Drilling levels are expected to remain high as industry will continue to maximize efforts to increase production. However, due to the maturity of the WCSB, the effort will result in only a modest increase in production over the next 2 years. The low decline characteristics of natural gas from coal (NGC) wells will have a stabilizing effect on WCSB deliverability over the long-term. It was noted that approximately 98 per cent of Canadian gas is produced from the WCSB with Alberta accounting for 80 per cent of the output. This assessment provided separate deliverability estimates for conventional gas in the WCSB, NGC, and offshore Nova Scotia. The contribution from offshore Nova Scotia will likely remain in the range of 10 to 11 million cubic metres per day until late 2006, and rise to an average of 13 million cubic metres per day in 2007 with added compression. It was concluded that Canadian deliverability will increase slightly through an increase in drilling activity. It was also noted that the province of Alberta and the petroleum industry are addressing the issue of drilling density, access to resources, noise and other environmental aspects of the expected increase in NGC activity. 3 tabs., 16 figs., 3 appendices

  17. Water-quality impact assessment for hydropower

    International Nuclear Information System (INIS)

    Daniil, E.I.; Gulliver, J.; Thene, J.R.

    1991-01-01

    A methodology to assess the impact of a hydropower facility on downstream water quality is described. Negative impacts can result from the substitution of discharges aerated over a spillway with minimally aerated turbine discharges that are often withdrawn from lower reservoir levels, where dissolved oxygen (DO) is typically low. Three case studies illustrate the proposed method and problems that can be encountered. Historic data are used to establish the probability of low-dissolved-oxygen occurrences. Synoptic surveys, combined with downstream monitoring, give an overall picture of the water-quality dynamics in the river and the reservoir. Spillway aeration is determined through measurements and adjusted for temperature. Theoretical computations of selective withdrawal are sensitive to boundary conditions, such as the location of the outlet-relative to the reservoir bottom, but withdrawal from the different layers is estimated from measured upstream and downstream temperatures and dissolved-oxygen profiles. Based on field measurements, the downstream water quality under hydropower operation is predicted. Improving selective withdrawal characteristics or diverting part of the flow over the spillway provided cost-effective mitigation solutions for small hydropower facilities (less than 15 MW) because of the low capital investment required

  18. Retention interval affects visual short-term memory encoding.

    Science.gov (United States)

    Bankó, Eva M; Vidnyánszky, Zoltán

    2010-03-01

    Humans can efficiently store fine-detailed facial emotional information in visual short-term memory for several seconds. However, an unresolved question is whether the same neural mechanisms underlie high-fidelity short-term memory for emotional expressions at different retention intervals. Here we show that retention interval affects the neural processes of short-term memory encoding using a delayed facial emotion discrimination task. The early sensory P100 component of the event-related potentials (ERP) was larger in the 1-s interstimulus interval (ISI) condition than in the 6-s ISI condition, whereas the face-specific N170 component was larger in the longer ISI condition. Furthermore, the memory-related late P3b component of the ERP responses was also modulated by retention interval: it was reduced in the 1-s ISI as compared with the 6-s condition. The present findings cannot be explained based on differences in sensory processing demands or overall task difficulty because there was no difference in the stimulus information and subjects' performance between the two different ISI conditions. These results reveal that encoding processes underlying high-precision short-term memory for facial emotional expressions are modulated depending on whether information has to be stored for one or for several seconds.

  19. A modeling tool to support decision making in future hydropower development in Chile

    Science.gov (United States)

    Vicuna, S.; Hermansen, C.; Cerda, J. P.; Olivares, M. A.; Gomez, T. I.; Toha, E.; Poblete, D.; Mao, L.; Falvey, M. J.; Pliscoff, P.; Melo, O.; Lacy, S.; Peredo, M.; Marquet, P. A.; Maturana, J.; Gironas, J. A.

    2017-12-01

    Modeling tools support planning by providing transparent means to assess the outcome of natural resources management alternatives within technical frameworks in the presence of conflicting objectives. Such tools, when employed to model different scenarios, complement discussion in a policy-making context. Examples of practical use of this type of tool exist, such as the Canadian public forest management, but are not common, especially in the context of developing countries. We present a tool to support the selection from a portfolio of potential future hydropower projects in Chile. This tool, developed by a large team of researchers under the guidance of the Chilean Energy Ministry, is especially relevant in the context of evident regionalism, skepticism and change in societal values in a country that has achieved a sustained growth alongside increased demands from society. The tool operates at a scale of a river reach, between 1-5 km long, on a domain that can be defined according to the scale needs of the related discussion, and its application can vary from river basins to regions or other spatial configurations that may be of interest. The tool addresses both available hydropower potential and the existence (inferred or observed) of other ecological, social, cultural and productive characteristics of the territory which are valuable to society, and provides a means to evaluate their interaction. The occurrence of each of these other valuable characteristics in the territory is measured by generating a presence-density score for each. Considering the level of constraint each characteristic imposes on hydropower development, they are weighted against each other and an aggregate score is computed. With this information, optimal trade-offs are computed between additional hydropower capacity and valuable local characteristics over the entire domain, using the classical knapsack 0-1 optimization algorithm. Various scenarios of different weightings and hydropower

  20. Hydropower is not plain sailing all the way

    International Nuclear Information System (INIS)

    De Vries, E.

    1991-01-01

    A report is given of the conference Hidroenergia 1991, which was held in Nice, France, from 12 to 15 June. The author highlights the subjects on the problems of implementing hydro-power, and the environmental effects of the use of hydro-power. Special attention is paid to the activities of the European Community to limit the constraints, which form hindrances to the development of hydroelectric power. 2 ills., 3 refs

  1. Comparison of Sugammadex and Neostigmine in Short Term Surgery

    Directory of Open Access Journals (Sweden)

    Fatih Koc

    2014-03-01

    Full Text Available Aim: This study compared the efficacy and cost effectivines of sugammadex and neostigmine for reversal of neuromuscular blockade induced by rocuronium for short term elective surgery. Material and Method: After written informed consent, 33 patients aged 18%u201365, ASA I-III, who were undergoing short term surgery (

  2. Short-term memory for scenes with affective content

    OpenAIRE

    Maljkovic, Vera; Martini, Paolo

    2005-01-01

    The emotional content of visual images can be parameterized along two dimensions: valence (pleasantness) and arousal (intensity of emotion). In this study we ask how these distinct emotional dimensions affect the short-term memory of human observers viewing a rapid stream of images and trying to remember their content. We show that valence and arousal modulate short-term memory as independent factors. Arousal influences dramatically the average speed of data accumulation in memory: Higher aro...

  3. Estimating the future ice sheet hydropower potential in Paakitsoq, Ilulissat, West Greenland

    DEFF Research Database (Denmark)

    Ahlstrøm, Andreas P.; Mottram, R.H.; Nielsen, C.

    2008-01-01

    sheet has emphasized the risk of sudden changes in catchment supply. In this study, we present a thorough investigation of hydropower feasibility at the Paakitsoq basin, near Ilulissat in West Greenland. The catchment is completely dominated by the Greenland ice sheet which provides large quantities...... of meltwater during the summer season. However, geometrical changes in the ice sheet, for example due to a retreat or an advance of the ice sheet margin, could change the hydrological catchment within the ice sheet. Such a change would have a devastating economical impact as a hydropower plant is a significant...... long-term investment for an Arctic community of modest population. Here we present a new bedrock and surface map of the Paakitsoq/Swiss Camp part of the Greenland ice sheet and a prediction of the future discharge up to 2080 AD using regional climate model output, dynamic ice sheet modelling...

  4. LANGUAGE REPETITION AND SHORT-TERM MEMORY: AN INTEGRATIVE FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Steve eMajerus

    2013-07-01

    Full Text Available Short-term maintenance of verbal information is a core factor of language repetition, especially when reproducing multiple or unfamiliar stimuli. Many models of language processing locate the verbal short-term maintenance function in the left posterior superior temporo-parietal area and its connections with the inferior frontal gyrus. However, research in the field of short-term memory has implicated bilateral fronto-parietal networks, involved in attention and serial order processing, as being critical for the maintenance and reproduction of verbal sequences. We present here an integrative framework aimed at bridging research in the language processing and short-term memory fields. This framework considers verbal short-term maintenance as an emergent function resulting from synchronized and integrated activation in dorsal and ventral language processing networks as well as fronto-parietal attention and serial order processing networks. To-be-maintained item representations are temporarily activated in the dorsal and ventral language processing networks, novel phoneme and word serial order information is proposed to be maintained via a right fronto-parietal serial order processing network, and activation in these different networks is proposed to be coordinated and maintained via a left fronto-parietal attention processing network. This framework provides new perspectives for our understanding of information maintenance at the nonword-, word- and sentence-level as well as of verbal maintenance deficits in case of brain injury.

  5. Language repetition and short-term memory: an integrative framework.

    Science.gov (United States)

    Majerus, Steve

    2013-01-01

    Short-term maintenance of verbal information is a core factor of language repetition, especially when reproducing multiple or unfamiliar stimuli. Many models of language processing locate the verbal short-term maintenance function in the left posterior superior temporo-parietal area and its connections with the inferior frontal gyrus. However, research in the field of short-term memory has implicated bilateral fronto-parietal networks, involved in attention and serial order processing, as being critical for the maintenance and reproduction of verbal sequences. We present here an integrative framework aimed at bridging research in the language processing and short-term memory fields. This framework considers verbal short-term maintenance as an emergent function resulting from synchronized and integrated activation in dorsal and ventral language processing networks as well as fronto-parietal attention and serial order processing networks. To-be-maintained item representations are temporarily activated in the dorsal and ventral language processing networks, novel phoneme and word serial order information is proposed to be maintained via a right fronto-parietal serial order processing network, and activation in these different networks is proposed to be coordinated and maintained via a left fronto-parietal attention processing network. This framework provides new perspectives for our understanding of information maintenance at the non-word-, word- and sentence-level as well as of verbal maintenance deficits in case of brain injury.

  6. Short-horizon regulation for long-term investors

    NARCIS (Netherlands)

    Shi, Z.; Werker, B.J.M.

    2012-01-01

    We study the effects of imposing repeated short-horizon regulatory constraints on long-term investors. We show that Value-at-Risk and Expected Shortfall constraints, when imposed dynamically, lead to similar optimal portfolios and wealth distributions. We also show that, in utility terms, the costs

  7. Development activities, challenges and prospects for the hydropower sector in Austria

    Science.gov (United States)

    Wagner, Beatrice; Hauer, Christoph; Habersack, Helmut

    2017-04-01

    This contribution intends to give an overview of hydropower development activities in Austria and deepen the knowledge on actual strategies and planning documents. Thereby, the focus is on a climate and energy policy based perspective, also analyzing economic trends at the hydropower sector due to energy market changes in the last years. This includes a comparison with other political strategies and programs dealing with hydropower exploitation based on selected countries. With respect to technology developments, a concise review on technological innovations, such as hydrokinetic energy conversion systems, and new constructive designs of conventional hydropower plants in Austria will be given. Moreover, potential impacts on environment and aquatic ecosystems are described. Finally, key challenges and prospects will be identified and discussed.

  8. 78 FR 58535 - Hydropower Regulatory Efficiency Act of 2013; Supplemental Notice of Workshop

    Science.gov (United States)

    2013-09-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD13-9-000] Hydropower... license for hydropower development at non-powered dams and closed-loop pumped storage projects in compliance with section 6 of the Hydropower Regulatory Efficiency Act of 2013. The workshop will be held in...

  9. Operating multireservoir hydropower systems for downstream water quality

    International Nuclear Information System (INIS)

    Hayes, D.F.

    1990-01-01

    Hydropower reservoir operations often impact tailwater quality and water quality in the stream or river below the impoundment for many miles. Determining optimal operating strategies for a system of hydropower reservoirs involves solving a highly dimensional nonlinear, nonconvex optimization problem. This research adds the additional complexities of downstream water quality considerations within the optimization formulation to determine operating strategies for a system of hydropower reservoirs operating in series (tandem) or parallel. The formulation was used to determine operating strategies for six reservoirs of the upper Cumberland river basin in Tennessee and Kentucky. Significant dissolved oxygen (DO) violations occur just upstream of Nashville, Tennessee below Old Hickory dam during the months of August and September. Daily reservoir releases were determined for the period of June through September which would produce the maximum hydropower revenue while meeting downstream water quality objectives. Optimal releases for three operational strategies were compared to historical operations for the years 1985, 1986, and 1988. These strategies included: spilling as necessary to meet water quality criteria, near normal operation (minimal spills), and drawdown of reservoirs as necessary to meet criteria without spills. Optimization results showed an 8% to 15% hydropower loss may be necessary to meet water quality criteria through spills and a 2% to 9% improvement in DO below Old Hickory may be possible without significant spills. Results also showed that substantial increases in initial headwater elevations would be necessary to meet daily DO criteria and avoid spills. The optimal control theory algorithm used to solve the problem proved to be an efficient and robust solver of this large optimization problem

  10. Verbal short-term memory and vocabulary learning in polyglots.

    Science.gov (United States)

    Papagno, C; Vallar, G

    1995-02-01

    Polyglot and non-polyglot Italian subjects were given tests assessing verbal (phonological) and visuo-spatial short-term and long-term memory, general intelligence, and vocabulary knowledge in their native language. Polyglots had a superior level of performance in verbal short-term memory tasks (auditory digit span and nonword repetition) and in a paired-associate learning test, which assessed the subjects' ability to acquire new (Russian) words. By contrast, the two groups had comparable performance levels in tasks assessing general intelligence, visuo-spatial short-term memory and learning, and paired-associate learning of Italian words. These findings, which are in line with neuropsychological and developmental evidence, as well as with data from normal subjects, suggest a close relationship between the capacity of phonological memory and the acquisition of foreign languages.

  11. The stimulation of hematosis on short-term and prolong irradiation

    International Nuclear Information System (INIS)

    Tukhtaev, T.M.

    1978-01-01

    This book studies the stimulation of hematosis on short-term and prolong irradiation, pathogenetic mechanisms of lesion and reconstruction of hematosis at critical radiation sickness, action hematosis stimulators in short-term irradiation conditions

  12. Efficient Operation of a Multi-purpose Reservoir in Chile: Integration of Economic Water Value for Irrigation and Hydropower

    Science.gov (United States)

    Olivares, M. A.; Gonzalez Cabrera, J. M., Sr.; Moreno, R.

    2016-12-01

    Operation of hydropower reservoirs in Chile is prescribed by an Independent Power System Operator. This study proposes a methodology that integrates power grid operations planning with basin-scale multi-use reservoir operations planning. The aim is to efficiently manage a multi-purpose reservoir, in which hydroelectric generation is competing with other water uses, most notably irrigation. Hydropower and irrigation are competing water uses due to a seasonality mismatch. Currently, the operation of multi-purpose reservoirs with substantial power capacity is prescribed as the result of a grid-wide cost-minimization model which takes irrigation requirements as constraints. We propose advancing in the economic co-optimization of reservoir water use for irrigation and hydropower at the basin level, by explicitly introducing the economic value of water for irrigation represented by a demand function for irrigation water. The proposed methodology uses the solution of a long-term grid-wide operations planning model, a stochastic dual dynamic program (SDDP), to obtain the marginal benefit function for water use in hydropower. This marginal benefit corresponds to the energy price in the power grid as a function of the water availability in the reservoir and the hydrologic scenarios. This function allows capture technical and economic aspects to the operation of hydropower reservoir in the power grid and is generated with the dual variable of the power-balance constraint, the optimal reservoir operation and the hydrologic scenarios used in SDDP. The economic value of water for irrigation and hydropower are then integrated into a basin scale stochastic dynamic program, from which stored water value functions are derived. These value functions are then used to re-optimize reservoir operations under several inflow scenarios.

  13. Greenhouse gas emissions of hydropower in the Mekong River Basin

    Science.gov (United States)

    Räsänen, Timo A.; Varis, Olli; Scherer, Laura; Kummu, Matti

    2018-03-01

    The Mekong River Basin in Southeast Asia is undergoing extensive hydropower development, but the magnitudes of related greenhouse gas emissions (GHG) are not well known. We provide the first screening of GHG emissions of 141 existing and planned reservoirs in the basin, with a focus on atmospheric gross emissions through the reservoir water surface. The emissions were estimated using statistical models that are based on global emission measurements. The hydropower reservoirs (119) were found to have an emission range of 0.2-1994 kg CO2e MWh-1 over a 100 year lifetime with a median of 26 kg CO2e MWh-1. Hydropower reservoirs facilitating irrigation (22) had generally higher emissions reaching over 22 000 kg CO2e MWh-1. The emission fluxes for all reservoirs (141) had a range of 26-1813 000 t CO2e yr-1 over a 100 year lifetime with a median of 28 000 t CO2e yr-1. Altogether, 82% of hydropower reservoirs (119) and 45% of reservoirs also facilitating irrigation (22) have emissions comparable to other renewable energy sources (equalling even the emission from fossil fuel power plants (>380 kg CO2e MWh-1). These results are tentative and they suggest that hydropower in the Mekong Region cannot be considered categorically as low-emission energy. Instead, the GHG emissions of hydropower should be carefully considered case-by-case together with the other impacts on the natural and social environment.

  14. Cheap oil benefits coal on the short term, not the long

    Energy Technology Data Exchange (ETDEWEB)

    Soras, C.G.; Stodden, J.R.

    1986-03-01

    This is a brief article describing the effects of the declining price of oil on the coal industry. The oil price explosion from 1973-1979 is described along with the present day situation. Oil consumption in the US and the general drop in production worldwide is represented. It is concluded that the coal industry will benefit in the short term from the present crisis but stands to make some losses in the long run.

  15. The sustainability of hydropower projects in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    de Methodio Maranhao Neto, Gil; Yana, Laurent

    2010-09-15

    The construction of hydropower plants unquestionably impacts the environment and communities. But countries such as Brazil have been able to build up a sophisticated socio-environmental legislation and institutions as well as a democratic and participative licensing process to protect the nature and the population affected. In some cases, plants greatly contribute towards the creation of local welfare to the population as well as good environmental practices. As a good example of best practices on socio-environmental standards, we will analyze Jirau Hydropower Project, currently under construction on the Madeira River, north of Brazil.

  16. Hydropower development and the meaning of place. Multi-ethnic hydropower struggles in Sikkim, India

    NARCIS (Netherlands)

    Dukpa, Rinchu Doma; Joshi, Deepa; Boelens, Rutgerd

    2018-01-01

    Academic research and media tend to emphasize the strong opposition to hydropower development in Sikkim, India, and position this as resistance to an environmentally-destructive, trans-local development, particularly by the culturally-rooted, ethnic minority Bhutia and Lepcha communities. There are

  17. The Water - Energy Nexus Of Hydropower. Are The Trade-Offs Between Electricity Generation And Water Supply Negligible?

    Science.gov (United States)

    Scherer, L.; Pfister, S.

    2015-12-01

    Hydropower ranks first among renewable sources of power production and provides globally about 16% of electricity. While it is praised for its low greenhouse gas emissions, it is accused of its large water consumption which surpasses that of all conventional and most renewable energy sources (except for bioenergy) by far. Previous studies mostly applied a gross evaporation approach where all the current evaporation from the plant's reservoir is allocated to hydropower. In contrast, we only considered net evaporation as the difference between current evaporation and actual evapotranspiration before the construction of the reservoir. In addition, we take into account local water stress, its monthly fluctuations and storage effects of the reservoir in order to assess the impacts on water availability for other users. We apply the method to a large dataset of almost 1500 globally distributed hydropower plants (HPPs), covering ~43% of global annual electricity generation, by combining reservoir information from the Global Reservoir and Dam (GRanD) database with information on electricity generation from the CARMA database. While we can confirm that the gross water consumption of hydropower is generally large (production-weighted average of 97 m3/GJ), other users are not necessarily deprived of water. In contrast, they also benefit in many cases from the reservoir because water is rather stored in the wet season and released in the dry season, thereby alleviating water stress. The production-weighted water scarcity footprint of the analyzed HPPs amounts to -41 m3 H2Oe/GJ. It has to be noted that the impacts among individual plants vary a lot. Larger HPPs generally consume less water per unit of electricity generated, but also the benefits related to alleviating water scarcity are lower. Overall, reservoirs promote both, energy and water security. Other environmental impacts such as flow alterations and social impacts should, however, also be considered, as they can be

  18. Disappearing rivers — The limits of environmental assessment for hydropower in India

    International Nuclear Information System (INIS)

    Erlewein, Alexander

    2013-01-01

    The mountain rivers of the Indian Himalaya possess a vast potential for hydropower generation. After decades of comparatively modest development recent years have seen a major intensification in the construction of new hydropower dams. Although increasingly portrayed as a form of renewable energy generation, hydropower development may lead to extensive alterations of fluvial systems and conflicts with resource use patterns of local communities. To appraise and reduce adverse effects is the purpose of statutory Environmental Impact Assessments (EIA) and corresponding mitigation plans. However, in the light of ambitious policies for hydropower expansion conventional approaches of environmental assessment are increasingly challenged to keep up with the intensity and pace of development. This paper aims to explore the systemic limitations of environmental assessment for hydropower development in the Indian state of Himachal Pradesh. Based on a qualitative methodology involving interviews with environmental experts, document reviews and field observations the study suggests that the current practice of constraining EIAs to the project level fails to address the larger effects of extensive hydropower development. Furthermore, it is critically discussed as to what extent the concept of Strategic Environmental Assessment (SEA) might have the potential to overcome existing shortcomings

  19. High-resolution assessment of global technical and economic hydropower potential

    NARCIS (Netherlands)

    Gernaat, David E.H.J.; Bogaart, Patrick W.; Vuuren, van Detlef P.; Biemans, Hester; Niessink, Robin

    2017-01-01

    Hydropower is the most important renewable energy source to date, providing over 72% of all renewable electricity globally. Yet, only limited information is available on the global potential supply of hydropower and the associated costs. Here we provide a high-resolution assessment of the technical

  20. 77 FR 2286 - Northern Illinois Hydropower, LLC; Notice of Meeting

    Science.gov (United States)

    2012-01-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12717-002] Northern Illinois Hydropower, LLC; Notice of Meeting a. Date and Time of Meeting: Thursday, January 26, 2012 from 11... Meeting: Commission staff will meet with Northern Illinois Hydropower, LLC to discuss potentially moving...

  1. Short-Term Energy Outlook: Quarterly projections. Fourth quarter 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-05

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the fourth quarter of 1993 through the fourth quarter of 1994. Values for the third quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications.

  2. Short-term and long-term earthquake occurrence models for Italy: ETES, ERS and LTST

    Directory of Open Access Journals (Sweden)

    Maura Murru

    2010-11-01

    Full Text Available This study describes three earthquake occurrence models as applied to the whole Italian territory, to assess the occurrence probabilities of future (M ≥5.0 earthquakes: two as short-term (24 hour models, and one as long-term (5 and 10 years. The first model for short-term forecasts is a purely stochastic epidemic type earthquake sequence (ETES model. The second short-term model is an epidemic rate-state (ERS forecast based on a model that is physically constrained by the application to the earthquake clustering of the Dieterich rate-state constitutive law. The third forecast is based on a long-term stress transfer (LTST model that considers the perturbations of earthquake probability for interacting faults by static Coulomb stress changes. These models have been submitted to the Collaboratory for the Study of Earthquake Predictability (CSEP for forecast testing for Italy (ETH-Zurich, and they were locked down to test their validity on real data in a future setting starting from August 1, 2009.

  3. Category Specific Knowledge Modulate Capacity Limitations of Visual Short-Term Memory

    DEFF Research Database (Denmark)

    Dall, Jonas Olsen; Watanabe, Katsumi; Sørensen, Thomas Alrik

    2016-01-01

    We explore whether expertise can modulate the capacity of visual short-term memory, as some seem to argue that training affects capacity of short-term memory [13] while others are not able to find this modulation [12]. We extend on a previous study [3] demonstrating expertise effects by investiga...... are in line with the theoretical interpretation that visual short-term memory reflects the sum of the reverberating feedback loops to representations in long-term memory.......We explore whether expertise can modulate the capacity of visual short-term memory, as some seem to argue that training affects capacity of short-term memory [13] while others are not able to find this modulation [12]. We extend on a previous study [3] demonstrating expertise effects......), and expert observers (Japanese university students). For both the picture and the letter condition we find no performance difference in memory capacity, however, in the critical hiragana condition we demonstrate a systematic difference relating expertise differences between the groups. These results...

  4. A short-term scheduling for the optimal operation of biorefineries

    International Nuclear Information System (INIS)

    Grisi, E.F.; Yusta, J.M.; Khodr, H.M.

    2011-01-01

    This work presents an analysis of the inherent potentialities and characteristics of the sugarcane industries that produce sugar, bioethanol, biogas and bioelectricity and that are being described as ''Biorefineries''. These Biorefineries are capable of producing bio-energy under diverse forms, intended for their own internal consumption and for external sales and marketing. A complex model and simulation are carried out of the processes of a sugarcane industry, with the data characteristic as well as the production costs, prices of products and considerations on the energy demand by basic processes. A Mixed-Integer Linear Programming (MILP) optimization problem formulation and an analysis of optimal solutions in short-term operation are described, taking into account the production cost functions of each commodity and the incomes obtained from selling electricity and other products. The objective is to maximize the hourly plant economic profit in the different scenarios considered in a real case study. (author)

  5. Impact of Different Time Series Streamflow Data on Energy Generation of a Run-of-River Hydropower Plant

    Science.gov (United States)

    Kentel, E.; Cetinkaya, M. A.

    2013-12-01

    Global issues such as population increase, power supply crises, oil prices, social and environmental concerns have been forcing countries to search for alternative energy sources such as renewable energy to satisfy the sustainable development goals. Hydropower is the most common form of renewable energy in the world. Hydropower does not require any fuel, produces relatively less pollution and waste and it is a reliable energy source with relatively low operating cost. In order to estimate the average annual energy production of a hydropower plant, sufficient and dependable streamflow data is required. The goal of this study is to investigate impact of streamflow data on annual energy generation of Balkusan HEPP which is a small run-of-river hydropower plant at Karaman, Turkey. Two different stream gaging stations are located in the vicinity of Balkusan HEPP and these two stations have different observation periods: one from 1986 to 2004 and the other from 2000 to 2009. These two observation periods show different climatic characteristics. Thus, annual energy estimations based on data from these two different stations differ considerably. Additionally, neither of these stations is located at the power plant axis, thus streamflow observations from these two stream gaging stations need to be transferred to the plant axis. This requirement introduces further errors into energy estimations. Impact of different streamflow data and transfer of streamflow observations to plant axis on annual energy generation of a small hydropower plant is investigated in this study.

  6. A heuristic approach for short-term operations planning in a catering company

    DEFF Research Database (Denmark)

    Farahani, Poorya; Grunow, Martin; Günther, H.O.

    2009-01-01

    Certain types of food such as catering foods decay very rapidly. This paper investigates how the quality of such foods can be improved by shortening the time interval between production and delivery. To this end, we develop an approach which integrates short-term production and distribution...... planning in a novel iterative scheme. The production scheduling problem is solved through an MILP modeling approach which is based on a block planning formulation complemented by a heuristic simplification procedure. Our investigation was motivated by a catering company located in Denmark. The production...... configuration and the processes assumed in our numerical experiments reflect real settings from this company. First numerical results are reported which demonstrate the applicability of the proposed approach....

  7. The essential oil of rosemary and its effect on the human image and numerical short-term memory

    OpenAIRE

    O.V. Filiptsova; L.V. Gazzavi-Rogozina; I.A. Timoshyna; O.I. Naboka; Ye.V. Dyomina; A.V. Ochkur

    2017-01-01

    The research results of the effect of essential oil of rosemary on the human short-term image and numerical memory have been described. The study involved 53 secondary school students (24 boys and 29 girls) aged 13–15 years, residents of the Ukrainian metropolis. Participants were divided into the control group and “Rosemary” group, in which the rosemary essential oil was sprayed. The statistically significant differences in productivity of the short-term memory of the participants of these t...

  8. Short-term mechanisms influencing volumetric brain dynamics

    NARCIS (Netherlands)

    Dieleman, Nikki; Koek, Huiberdina L.; Hendrikse, Jeroen

    2017-01-01

    With the use of magnetic resonance imaging (MRI) and brain analysis tools, it has become possible to measure brain volume changes up to around 0.5%. Besides long-term brain changes caused by atrophy in aging or neurodegenerative disease, short-term mechanisms that influence brain volume may exist.

  9. Leisure-time physical activity and direct cost of short-term sickness absence among Finnish municipal employees.

    Science.gov (United States)

    Tolonen, Anu; Rahkonen, Ossi; Lahti, Jouni

    2017-03-04

    We aimed to examine the direct costs of short-term (1-14 days) sickness absence and the effect of employees' physical activity on the costs. The Finnish Helsinki Health Study survey (2007) was used in the analysis (n = 3,935). Physical activity was classified into inactive, moderately active, and vigorously active. Sickness absence (3 years follow-up) and salary data were derived from the employer's registers. On average, an employee was absent 6 days a year due to short-term sickness absence, with a production loss of 2,350 EUR during the 3 years. The vigorously active had less sickness absence than those less active. The direct cost of sickness absence of a vigorously active employee was 404 EUR less than that of an inactive employee. Promoting physical activity among employees may decrease direct cost of short-term sickness absence.

  10. The future of hydropower planning modeling

    Science.gov (United States)

    Haas, J.; Zuñiga, D.; Nowak, W.; Olivares, M. A.; Castelletti, A.; Thilmant, A.

    2017-12-01

    Planning the investment and operation of hydropower plants with optimization tools dates back to the 1970s. The focus used to be solely on the provision of energy. However, advances in computational capacity and solving algorithms, dynamic markets, expansion of renewable sources, and a better understanding of hydropower environmental impacts have recently led to the development of novel planning approaches. In this work, we provide a review, systematization, and trend analysis of these approaches. Further, through interviews with experts, we outline the future of hydropower planning modeling and identify the gaps towards it. We classified the found models along environmental, economic, multipurpose and technical criteria. Environmental interactions include hydropeaking mitigation, water quality protection and limiting greenhouse gas emissions from reservoirs. Economic and regulatory criteria consider uncertainties of fossil fuel prices and relicensing of water rights and power purchase agreements. Multipurpose considerations account for irrigation, tourism, flood protection and drinking water. Recently included technical details account for sedimentation in reservoirs and variable efficiencies of turbines. Additional operational considerations relate to hydrological aspects such as dynamic reservoir inflows, water losses, and climate change. Although many of the above criteria have been addressed in detail on a project-to-project basis, models remain overly simplistic for planning large power fleets. Future hydropower planning tools are expected to improve the representation of the water-energy nexus, including environmental and multipurpose criteria. Further, they will concentrate on identifying new sources of operational flexibility (e.g. through installing additional turbines and pumps) for integrating renewable energy. The operational detail will increase, potentially emphasizing variable efficiencies, storage capacity losses due to sedimentation, and the

  11. Potentials of short term and long term cryopreserved sperm of the ...

    African Journals Online (AJOL)

    To service the growing demand for male African giant catfish (Clarias gariepinus) broodstock for aquaculture in Nigeria, and to conserve valuable genetic resources, we improved both short-term (in deep freezer at -35°C) and long-term cryopreservation (in liquid nitrogen at -296°C) of catfish sperm. Catfish sperm ...

  12. Short-term dehydroepiandrosterone treatment increases platelet cGMP production in elderly male subjects.

    Science.gov (United States)

    Martina, Valentino; Benso, Andrea; Gigliardi, Valentina Ramella; Masha, Andi; Origlia, Carla; Granata, Riccarda; Ghigo, Ezio

    2006-03-01

    Several clinical and population-based studies suggest that dehydroepiandrosterone (DHEA) and its sulphate (DHEA-S) play a protective role against atherosclerosis and coronary artery disease in human. However, the mechanisms underlying this action are still unknown. It has recently been suggested that DHEA-S could delay atheroma formation through an increase in nitric oxide (NO) production. Twenty-four aged male subjects [age (mean +/- SEM): 65.4 +/- 0.7 year; range: 58.2-67.6 years] underwent a blinded placebo controlled study receiving DHEA (50 mg p.o. daily at bedtime) or placebo for 2 months. Platelet cyclic guanosine-monophosphate (cGMP) concentration (as marker of NO production) and serum levels of DHEA-S, DHEA, IGF-I, insulin, glucose, oestradiol (E(2)), testosterone, plasminogen activator inhibitor (PAI)-1 antigen (PAI-1 Ag), homocysteine and lipid profile were evaluated before and after the 2-month treatment with DHEA or placebo. At the baseline, all variables in the two groups were overlapping. All parameters were unchanged after treatment with placebo. Conversely, treatment with DHEA (a) increased (P < 0.001 vs. baseline) platelet cGMP (111.9 +/- 7.1 vs. 50.1 +/- 4.1 fmol/10(6) plts), DHEA-S (13.6 +/- 0.8 vs. 3.0 +/- 0.3 micromol/l), DHEA (23.6 +/- 1.7 vs. 15.3 +/- 1.4 nmol/l), testosterone (23.6 +/- 1.0 vs. 17.7 +/- 1.0 nmol/l) and E(2) (72.0 +/- 5.0 vs. 60.0 +/- 4.0 pmol/l); and (b) decreased (P < 0.05 vs. baseline) PAI-1 Ag (27.4 +/- 3.8 vs. 21.5 +/- 2.5 ng/ml) and low-density lipoprotein (LDL) cholesterol (3.4 +/- 0.2 vs. 3.0 +/- 0.2 mmol/l). IGF-I, insulin, glucose, triglycerides, total cholesterol, HDL cholesterol, HDL2 cholesterol, HDL3 cholesterol, apolipoprotein A1 (ApoA1), apolipoprotein B (ApoB) and homocysteine levels were not modified by DHEA treatment. This study shows that short-term treatment with DHEA increased platelet cGMP production, a marker of NO production, in healthy elderly subjects. This effect is coupled with a decrease in PAI-1

  13. A New Empirical Model for Short-Term Forecasting of the Broadband Penetration: A Short Research in Greece

    Directory of Open Access Journals (Sweden)

    Salpasaranis Konstantinos

    2011-01-01

    Full Text Available The objective of this paper is to present a short research about the overall broadband penetration in Greece. In this research, a new empirical deterministic model is proposed for the short-term forecast of the cumulative broadband adoption. The fitting performance of the model is compared with some widely used diffusion models for the cumulative adoption of new telecommunication products, namely, Logistic, Gompertz, Flexible Logistic (FLOG, Box-Cox, Richards, and Bass models. The fitting process is done with broadband penetration official data for Greece. In conclusion, comparing these models with the empirical model, it could be argued that the latter yields well enough statistics indicators for fitting and forecasting performance. It also stresses the need for further research and performance analysis of the model in other more mature broadband markets.

  14. Improved decomposition–coordination and discrete differential dynamic programming for optimization of large-scale hydropower system

    International Nuclear Information System (INIS)

    Li, Chunlong; Zhou, Jianzhong; Ouyang, Shuo; Ding, Xiaoling; Chen, Lu

    2014-01-01

    Highlights: • Optimization of large-scale hydropower system in the Yangtze River basin. • Improved decomposition–coordination and discrete differential dynamic programming. • Generating initial solution randomly to reduce generation time. • Proposing relative coefficient for more power generation. • Proposing adaptive bias corridor technology to enhance convergence speed. - Abstract: With the construction of major hydro plants, more and more large-scale hydropower systems are taking shape gradually, which brings up a challenge to optimize these systems. Optimization of large-scale hydropower system (OLHS), which is to determine water discharges or water levels of overall hydro plants for maximizing total power generation when subjecting to lots of constrains, is a high dimensional, nonlinear and coupling complex problem. In order to solve the OLHS problem effectively, an improved decomposition–coordination and discrete differential dynamic programming (IDC–DDDP) method is proposed in this paper. A strategy that initial solution is generated randomly is adopted to reduce generation time. Meanwhile, a relative coefficient based on maximum output capacity is proposed for more power generation. Moreover, an adaptive bias corridor technology is proposed to enhance convergence speed. The proposed method is applied to long-term optimal dispatches of large-scale hydropower system (LHS) in the Yangtze River basin. Compared to other methods, IDC–DDDP has competitive performances in not only total power generation but also convergence speed, which provides a new method to solve the OLHS problem

  15. Forecasting stock return volatility: A comparison between the roles of short-term and long-term leverage effects

    Science.gov (United States)

    Pan, Zhiyuan; Liu, Li

    2018-02-01

    In this paper, we extend the GARCH-MIDAS model proposed by Engle et al. (2013) to account for the leverage effect in short-term and long-term volatility components. Our in-sample evidence suggests that both short-term and long-term negative returns can cause higher future volatility than positive returns. Out-of-sample results show that the predictive ability of GARCH-MIDAS is significantly improved after taking the leverage effect into account. The leverage effect for short-term volatility component plays more important role than the leverage effect for long-term volatility component in affecting out-of-sample forecasting performance.

  16. Short-Term Efficacy of a "Sit Less, Walk More" Workplace Intervention on Improving Cardiometabolic Health and Work Productivity in Office Workers.

    Science.gov (United States)

    Lin, Yun-Ping; Lin, Chiu-Chu; Chen, Meei-Maan; Lee, Kwo-Chen

    2017-03-01

    The aim of this study was to test the short-term efficacy of the Sit Less, Walk More (SLWM) workplace intervention. This was a quasi-experimental design. A total of 99 office workers from two workplaces participated in this study. The 12-week intervention included five components: monthly newsletters, motivational tools, pedometer challenge, environmental prompts, and walking route. The comparison group received monthly newsletters only. Generalized estimating equation analyses showed that the intervention group demonstrated significant improvements in weight (P = 0.029), waist circumference (P = 0.038), diastolic blood pressure (P workplace intervention can improve worker health and lost-productivity.

  17. Auditory short-term memory activation during score reading.

    Science.gov (United States)

    Simoens, Veerle L; Tervaniemi, Mari

    2013-01-01

    Performing music on the basis of reading a score requires reading ahead of what is being played in order to anticipate the necessary actions to produce the notes. Score reading thus not only involves the decoding of a visual score and the comparison to the auditory feedback, but also short-term storage of the musical information due to the delay of the auditory feedback during reading ahead. This study investigates the mechanisms of encoding of musical information in short-term memory during such a complicated procedure. There were three parts in this study. First, professional musicians participated in an electroencephalographic (EEG) experiment to study the slow wave potentials during a time interval of short-term memory storage in a situation that requires cross-modal translation and short-term storage of visual material to be compared with delayed auditory material, as it is the case in music score reading. This delayed visual-to-auditory matching task was compared with delayed visual-visual and auditory-auditory matching tasks in terms of EEG topography and voltage amplitudes. Second, an additional behavioural experiment was performed to determine which type of distractor would be the most interfering with the score reading-like task. Third, the self-reported strategies of the participants were also analyzed. All three parts of this study point towards the same conclusion according to which during music score reading, the musician most likely first translates the visual score into an auditory cue, probably starting around 700 or 1300 ms, ready for storage and delayed comparison with the auditory feedback.

  18. Short-term carbon partitioning fertilizer responses vary among two full-sib loblolly pine clones

    Science.gov (United States)

    Jeremy P. Stovall; John R. Seiler; Thomas R. Fox

    2012-01-01

    We investigated the effects of fertilizer application on the partitioning of gross primary productivity (GPP) between contrasting full-sib clones of Pinus taeda (L.). Our objective was to determine if fertilizer growth responses resulted from similar short-term changes to partitioning. A modeling approach incorporating respiratory carbon (C) fluxes,...

  19. Using hydropower to complement wind energy: a hybrid system to provide firm power

    Energy Technology Data Exchange (ETDEWEB)

    Jaramillo, O.A.; Borja, M.A.; Huacuz, J.M. [Instituto de Investigaciones Electricas, Morelos (Mexico). Energias No Convencionales

    2004-09-01

    This paper presents a theoretical study of how wind power can be complemented by hydropower. A conceptual framework is provided for a hybrid power station that produces constant power output without the intermittent fluctuations inherent when using wind power. Two hypothetical facilities are considered as case studies. One of them is a hydropower plant located on the ''Presidente Benito Juarez'' dam in Jalapa del Marques, Oaxaca, Mexico. The other hypothetical facility is a wind farm located near ''La Venta's', an area in Juchitan, Oaxaca, Mexico. The wind-hydro-power system is a combined wind and hydro power plant in a region that is rich in both resources. The model shows that the hybrid plant could provide close to 20 MW of firm power to the electrical distribution system. On a techno-economic basis, we obtain the levelized production cost of the hybrid system. Taking into account two different discount rates of 7% and 10%, figures for levelized production cost are developed. (author)

  20. Short-term and working memory impairments in aphasia.

    Science.gov (United States)

    Potagas, Constantin; Kasselimis, Dimitrios; Evdokimidis, Ioannis

    2011-08-01

    The aim of the present study is to investigate short-term memory and working memory deficits in aphasics in relation to the severity of their language impairment. Fifty-eight aphasic patients participated in this study. Based on language assessment, an aphasia score was calculated for each patient. Memory was assessed in two modalities, verbal and spatial. Mean scores for all memory tasks were lower than normal. Aphasia score was significantly correlated with performance on all memory tasks. Correlation coefficients for short-term memory and working memory were approximately of the same magnitude. According to our findings, severity of aphasia is related with both verbal and spatial memory deficits. Moreover, while aphasia score correlated with lower scores in both short-term memory and working memory tasks, the lack of substantial difference between corresponding correlation coefficients suggests a possible primary deficit in information retention rather than impairment in working memory. Copyright © 2011 Elsevier Ltd. All rights reserved.