WorldWideScience

Sample records for short-term hydroelectric generation

  1. Model documentation report: Short-Term Hydroelectric Generation Model

    International Nuclear Information System (INIS)

    1993-08-01

    The purpose of this report is to define the objectives of the Short- Term Hydroelectric Generation Model (STHGM), describe its basic approach, and to provide details on the model structure. This report is intended as a reference document for model analysts, users, and the general public. Documentation of the model is in accordance with the Energy Information Administration's (AYE) legal obligation to provide adequate documentation in support of its models (Public Law 94-385, Section 57.b.2). The STHGM performs a short-term (18 to 27- month) forecast of hydroelectric generation in the United States using an autoregressive integrated moving average (UREMIA) time series model with precipitation as an explanatory variable. The model results are used as input for the short-term Energy Outlook

  2. Short term hydroelectric power system scheduling with wind turbine generators using the multi-pass iteration particle swarm optimization approach

    International Nuclear Information System (INIS)

    Lee, T.-Y.

    2008-01-01

    This paper uses multi-pass iteration particle swarm optimization (MIPSO) to solve short term hydroelectric generation scheduling of a power system with wind turbine generators. MIPSO is a new algorithm for solving nonlinear optimal scheduling problems. A new index called iteration best (IB) is incorporated into particle swarm optimization (PSO) to improve solution quality. The concept of multi-pass dynamic programming is applied to modify PSO further and improve computation efficiency. The feasible operational regions of the hydro units and pumped storage plants over the whole scheduling time range must be determined before applying MIPSO to the problem. Wind turbine power generation then shaves the power system load curves. Next, MIPSO calculates hydroelectric generation scheduling. It begins with a coarse time stage and searching space and refines the time interval between two time stages and the search spacing pass by pass (iteration). With the cooperation of agents called particles, the near optimal solution of the scheduling problem can be effectively reached. The effects of wind speed uncertainty were also considered in this paper. The feasibility of the new algorithm is demonstrated by a numerical example, and MIPSO solution quality and computation efficiency are compared to those of other algorithms

  3. EDM - A model for optimising the short-term power operation of a complex hydroelectric network

    International Nuclear Information System (INIS)

    Tremblay, M.; Guillaud, C.

    1996-01-01

    In order to optimize the short-term power operation of a complex hydroelectric network, a new model called EDM was added to PROSPER, a water management analysis system developed by SNC-Lavalin. PROSPER is now divided into three parts: an optimization model (DDDP), a simulation model (ESOLIN), and an economic dispatch model (EDM) for the short-term operation. The operation of the KSEB hydroelectric system (located in southern India) with PROSPER was described. The long-term analysis with monthly time steps is assisted by the DDDP, and the daily analysis with hourly or half-hourly time steps is performed with the EDM model. 3 figs

  4. Short-term cascaded hydroelectric system scheduling based on chaotic particle swarm optimization using improved logistic map

    Science.gov (United States)

    He, Yaoyao; Yang, Shanlin; Xu, Qifa

    2013-07-01

    In order to solve the model of short-term cascaded hydroelectric system scheduling, a novel chaotic particle swarm optimization (CPSO) algorithm using improved logistic map is introduced, which uses the water discharge as the decision variables combined with the death penalty function. According to the principle of maximum power generation, the proposed approach makes use of the ergodicity, symmetry and stochastic property of improved logistic chaotic map for enhancing the performance of particle swarm optimization (PSO) algorithm. The new hybrid method has been examined and tested on two test functions and a practical cascaded hydroelectric system. The experimental results show that the effectiveness and robustness of the proposed CPSO algorithm in comparison with other traditional algorithms.

  5. A self-adaptive chaotic particle swarm algorithm for short term hydroelectric system scheduling in deregulated environment

    International Nuclear Information System (INIS)

    Jiang Chuanwen; Bompard, Etorre

    2005-01-01

    This paper proposes a short term hydroelectric plant dispatch model based on the rule of maximizing the benefit. For the optimal dispatch model, which is a large scale nonlinear planning problem with multi-constraints and multi-variables, this paper proposes a novel self-adaptive chaotic particle swarm optimization algorithm to solve the short term generation scheduling of a hydro-system better in a deregulated environment. Since chaotic mapping enjoys certainty, ergodicity and the stochastic property, the proposed approach introduces chaos mapping and an adaptive scaling term into the particle swarm optimization algorithm, which increases its convergence rate and resulting precision. The new method has been examined and tested on a practical hydro-system. The results are promising and show the effectiveness and robustness of the proposed approach in comparison with the traditional particle swarm optimization algorithm

  6. Short-term forecasting model for aggregated regional hydropower generation

    International Nuclear Information System (INIS)

    Monteiro, Claudio; Ramirez-Rosado, Ignacio J.; Fernandez-Jimenez, L. Alfredo

    2014-01-01

    Highlights: • Original short-term forecasting model for the hourly hydropower generation. • The use of NWP forecasts allows horizons of several days. • New variable to represent the capacity level for generating hydroelectric energy. • The proposed model significantly outperforms the persistence model. - Abstract: This paper presents an original short-term forecasting model of the hourly electric power production for aggregated regional hydropower generation. The inputs of the model are previously recorded values of the aggregated hourly production of hydropower plants and hourly water precipitation forecasts using Numerical Weather Prediction tools, as well as other hourly data (load demand and wind generation). This model is composed of three modules: the first one gives the prediction of the “monthly” hourly power production of the hydropower plants; the second module gives the prediction of hourly power deviation values, which are added to that obtained by the first module to achieve the final forecast of the hourly hydropower generation; the third module allows a periodic adjustment of the prediction of the first module to improve its BIAS error. The model has been applied successfully to the real-life case study of the short-term forecasting of the aggregated hydropower generation in Spain and Portugal (Iberian Peninsula Power System), achieving satisfactory results for the next-day forecasts. The model can be valuable for agents involved in electricity markets and useful for power system operations

  7. Short-cut design of small hydroelectric plants

    Energy Technology Data Exchange (ETDEWEB)

    Voros, N.G.; Kiranoudis, C.T.; Maroulis, Z.B. [National Technical Univ. of Athens, Dept. of Chemical Engineering, Athens (Greece)

    2000-04-01

    The problem of designing small hydroelectric plants has been properly analysed and addressed in terms of maximising the economic benefits of the investment. An appropriate empirical model describing hydroturbine efficiency was developed. An overall plant model was introduced by taking into account their construction characteristics and operational performance. The hydrogeographical characteristics for a wide range of sites have been appropriately analysed and a model that involves significant physical parameters has been developed. The design problem was formulated as a mathematical programming problem, and solved using appropriate programming techniques. The optimisation covered a wide range of site characteristics and three types of commercially available hydroturbines. The methodology introduced an empirical short-cut design equation for the determination of the optimum nominal flowrate of the hydroturbines and the estimation of the expected unit cost of electricity produced, as well as of the potential amount of annually recovered energy. (Author)

  8. Hydroelectric Generating Facilities General Permit ...

    Science.gov (United States)

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  9. Evaluation of the Life Cycle Greenhouse Gas Emissions from Hydroelectricity Generation Systems

    Directory of Open Access Journals (Sweden)

    Akhil Kadiyala

    2016-06-01

    Full Text Available This study evaluated the life cycle greenhouse gas (GHG emissions from different hydroelectricity generation systems by first performing a comprehensive review of the hydroelectricity generation system life cycle assessment (LCA studies and then subsequent computation of statistical metrics to quantify the life cycle GHG emissions (expressed in grams of carbon dioxide equivalent per kilowatt hour, gCO2e/kWh. A categorization index (with unique category codes, formatted as “facility type-electric power generation capacity” was developed and used in this study to evaluate the life cycle GHG emissions from the reviewed hydroelectricity generation systems. The unique category codes were labeled by integrating the names of the two hydro power sub-classifications, i.e., the facility type (impoundment (I, diversion (D, pumped storage (PS, miscellaneous hydropower works (MHPW and the electric power generation capacity (micro (µ, small (S, large (L. The characterized hydroelectricity generation systems were statistically evaluated to determine the reduction in corresponding life cycle GHG emissions. A total of eight unique categorization codes (I-S, I-L, D-µ, D-S, D-L, PS-L, MHPW-µ, MHPW-S were designated to the 19 hydroelectricity generation LCA studies (representing 178 hydropower cases using the proposed categorization index. The mean life cycle GHG emissions resulting from the use of I-S (N = 24, I-L (N = 8, D-µ (N = 3, D-S (N = 133, D-L (N = 3, PS-L (N = 3, MHPW-µ (N = 3, and MHPW-S (N = 1 hydroelectricity generation systems are 21.05 gCO2e/kWh, 40.63 gCO2e/kWh, 47.82 gCO2e/kWh, 27.18 gCO2e/kWh, 3.45 gCO2e/kWh, 256.63 gCO2e/kWh, 19.73 gCO2e/kWh, and 2.78 gCO2e/kWh, respectively. D-L hydroelectricity generation systems produced the minimum life cycle GHGs (considering the hydroelectricity generation system categories with a representation of at least two cases.

  10. improvement of hydroelectric power generation using pumped

    African Journals Online (AJOL)

    HOD

    1, 4 DEPARTMENT OF SYSTEMS ENGINEERING, UNIVERSITY OF LAGOS, AKOKA, YABA, ... pumped storage system for generating hydroelectric power all year round. ... Power supply situation in Nigeria has no doubt ..... (objective functions), criteria for evaluation of control .... adsen H “Para eter esti ation in distributed.

  11. Extrapolation of dynamic load behaviour on hydroelectric turbine blades with cyclostationary modelling

    Science.gov (United States)

    Poirier, Marc; Gagnon, Martin; Tahan, Antoine; Coutu, André; Chamberland-lauzon, Joël

    2017-01-01

    In this paper, we present the application of cyclostationary modelling for the extrapolation of short stationary load strain samples measured in situ on hydraulic turbine blades. Long periods of measurements allow for a wide range of fluctuations representative of long-term reality to be considered. However, sampling over short periods limits the dynamic strain fluctuations available for analysis. The purpose of the technique presented here is therefore to generate a representative signal containing proper long term characteristics and expected spectrum starting with a much shorter signal period. The final objective is to obtain a strain history that can be used to estimate long-term fatigue behaviour of hydroelectric turbine runners.

  12. Improvement of hydroelectric power generation using pumped ...

    African Journals Online (AJOL)

    By principle, hydroelectric power generation relies on the law of conservation of energy where kinetic energy that resulted from the movement of the mass of water from the river is translated into electr icity, the quantum of which depends on systemic variables viz: plant efficiency, volumetric water flow through the turbine and ...

  13. The Feasibility of Small Hydro-Electric Generation in a Large Urban Area

    OpenAIRE

    Benson Y. Zhang; Adam Taylor

    2012-01-01

    The possibilities of generating electric power from relatively small hydro-electric sources in a large urban area is investigated. Two different aspects of hydro-electric sources have been studied: storm/waste water pipes in large multi-tenanted residential buildings and urban storm water discharge area (CSI area). The potential to generate from these sources has been investigated using a micro-turbine. The potential electric power which could be extracted from the sources was estimated using...

  14. 75 FR 30805 - Gibson Dam Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions...

    Science.gov (United States)

    2010-06-02

    ... Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions, Recommendations, and Prescriptions May 26, 2010. Take notice that the following hydroelectric application and applicant-prepared..., 2009. d. Applicant: Gibson Dam Hydroelectric Company, LLC. e. Name of Project: Gibson Dam Hydroelectric...

  15. The determinants of cost efficiency of hydroelectric generating plants: A random frontier approach

    International Nuclear Information System (INIS)

    Barros, Carlos P.; Peypoch, Nicolas

    2007-01-01

    This paper analyses the technical efficiency in the hydroelectric generating plants of a main Portuguese electricity enterprise EDP (Electricity of Portugal) between 1994 and 2004, investigating the role played by increase in competition and regulation. A random cost frontier method is adopted. A translog frontier model is used and the maximum likelihood estimation technique is employed to estimate the empirical model. We estimate the efficiency scores and decompose the exogenous variables into homogeneous and heterogeneous. It is concluded that production and capacity are heterogeneous, signifying that the hydroelectric generating plants are very distinct and therefore any energy policy should take into account this heterogeneity. It is also concluded that competition, rather than regulation, plays the key role in increasing hydroelectric plant efficiency

  16. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Science.gov (United States)

    2011-08-19

    ... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...

  17. Evaluating the quality of scenarios of short-term wind power generation

    DEFF Research Database (Denmark)

    Pinson, Pierre; Girard, R.

    2012-01-01

    Scenarios of short-term wind power generation are becoming increasingly popular as input to multi-stage decision-making problems e.g. multivariate stochastic optimization and stochastic programming. The quality of these scenarios is intuitively expected to substantially impact the benets from...... their use in decision-making. So far however, their verication is almost always focused on their marginal distributions for each individual lead time only, thus overlooking their temporal interdependence structure. The shortcomings of such an approach are discussed. Multivariate verication tools, as well...... as diagnostic approaches based on event-based verication are then presented. Their application to the evaluation of various sets of scenarios of short-term wind power generation demonstrates them as valuable discrimination tools....

  18. Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.

  19. Evaluating the quality of scenarios of short-term wind power generation

    International Nuclear Information System (INIS)

    Pinson, P.; Girard, R.

    2012-01-01

    Highlights: ► Presentation of the desirable properties of wind power generation scenarios. ► Description of various evaluation frameworks (univariate, multivariate, diagnostic). ► Highlighting of the properties of current approaches to scenario generation. ► Guidelines for future evaluation/benchmark exercises. -- Abstract: Scenarios of short-term wind power generation are becoming increasingly popular as input to multistage decision-making problems e.g. multivariate stochastic optimization and stochastic programming. The quality of these scenarios is intuitively expected to substantially impact the benefits from their use in decision-making. So far however, their verification is almost always focused on their marginal distributions for each individual lead time only, thus overlooking their temporal interdependence structure. The shortcomings of such an approach are discussed. Multivariate verification tools, as well as diagnostic approaches based on event-based verification are then presented. Their application to the evaluation of various sets of scenarios of short-term wind power generation demonstrates them as valuable discrimination tools.

  20. Essays on investment planning in electricity generating capacity

    Science.gov (United States)

    Gonzalez-Gomez, Jorge

    In the first part of this study we develop and analyze two mathematical models that incorporate a time changing demand for electricity and uncertainty of input prices. The first model highlights the shortcomings in assuming a constant plant utilization under uncertainty of input prices and the effects of such assumption on the optimal investment in electricity generating capacity in a simple two period model. The second model presents sufficient restrictions to the optimal investment in electricity generating capacity problem to allow for a recursive solution. The necessary restrictions are extremely limiting to the extend that we found a solution for very simple scenarios. In our opinion, the problem is better handled in a case by case basis rather than under a general dynamic framework. Following the spirit of our conclusions of the first part of our study, in the second part we provide a methodology to simulate long-term natural gas prices, we analyze the investment prospects of nuclear and natural gas generating capacity in Mexico and provide a constraint approach for the optimal generation of hydroelectric plants in the Mexican hydroelectric system. These three problems belong to the solution of the optimal investment in electricity generating capacity in Mexico. To simulate the uncertainty of natural gas prices, we assume that natural gas prices are the sum of two stochastic processes: short-term and long-term variability. We characterize the short-term variability of natural gas prices using an Exponential General Autoregressive Conditional Heteroskedastic (EGARCH) model. The uncertainty of the long-term variability of natural gas prices is based on the long-term natural gas prices scenarios of the National Energy Modeling System of the Energy Information Administration. Equipped with a methodology to simulate long-term natural gas prices, we investigate the investment prospects of nuclear and natural gas generating capacity in Mexico using the levelized

  1. Generation of statistical scenarios of short-term wind power production

    DEFF Research Database (Denmark)

    Pinson, Pierre; Papaefthymiou, George; Klockl, Bernd

    2007-01-01

    Short-term (up to 2-3 days ahead) probabilistic forecasts of wind power provide forecast users with a paramount information on the uncertainty of expected wind generation. Whatever the type of these probabilistic forecasts, they are produced on a per horizon basis, and hence do not inform...... on the development of the forecast uncertainty through forecast series. This issue is addressed here by describing a method that permits to generate statistical scenarios of wind generation that accounts for the interdependence structure of prediction errors, in plus of respecting predictive distributions of wind...

  2. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    Science.gov (United States)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  3. Comparison of Gross Greenhouse Gas Fluxes from Hydroelectric Reservoirs in Brazil with Thermopower Generation

    Science.gov (United States)

    Rogerio, J. P.; Dos Santos, M. A.; Matvienko, B.; dos Santos, E.; Rocha, C. H.; Sikar, E.; Junior, A. M.

    2013-05-01

    Widespread interest in human impacts on the Earth has prompted much questioning in fields of concern to the general public. One of these issues is the extent of the impacts on the environment caused by hydro-based power generation, once viewed as a clean energy source. From the early 1990s onwards, papers and studies have been challenging this assumption through claims that hydroelectric dams also emit greenhouse gases, generated by the decomposition of biomass flooded by filling these reservoirs. Like as other freshwater bodies, hydroelectric reservoirs produce gases underwater by biology decomposition of organic matter. Some of these biogenic gases are effective in terms of Global Warming. The decomposition is mainly due by anaerobically regime, emitting methane (CH4), nitrogen (N2) and carbon dioxide (CO2). This paper compare results obtained from gross greenhouse fluxes in Brazilian hydropower reservoirs with thermo power plants using different types of fuels and technology. Measurements were carried in the Manso, Serra da Mesa, Corumbá, Itumbiara, Estreito, Furnas and Peixoto reservoirs, located in Cerrado biome and in Funil reservoir located at Atlantic forest biome with well defined climatologically regimes. Fluxes of carbon dioxide and methane in each of the reservoirs selected, whether through bubbles and/or diffusive exchange between water and atmosphere, were assessed by sampling. The intensity of emissions has a great variability and some environmental factors could be responsible for these variations. Factors that influence the emissions could be the water and air temperature, depth, wind velocity, sunlight, physical and chemical parameters of water, the composition of underwater biomass and the operational regime of the reservoir. Based in this calculations is possible to conclude that the large amount of hydro-power studied is better than thermopower source in terms of atmospheric greenhouse emissions. The comparisons between the reservoirs studied

  4. Hydraulic potential evaluation for micro - scale hydroelectric generation at Chicamocha River Basin - micro - scale hydroelectric plants

    International Nuclear Information System (INIS)

    Pacheco P, C.M.; Parga C, G.M.

    1995-01-01

    In development of technical and scientific cooperation treaty carried out between INEA (today Ingeominas) and Catholic University of Colombia, was elaborated the program: Potential Evaluation Hydraulic for Small hydroelectric plants; whose purpose is to carry electrical energy service to smaller populations and rural zones to all municipalities of country. To begin the program was selected the corresponding area to Chicamocha River Basin, the one which corresponds to 72 Municipalities of Boyaca and Santander Departments, due to the fact that is had good information area originating from diagnostic elaborated by INDERENA with the objective of formulating the Classification Plan and the Basin Managing. This Thesis consists of: 1. To identify all micro-basins; 2. To analyze energy demand on part of kernels of population seated in the study area; 3. To evaluate energy generating capacity of water currents and 4. As of the obtained results, to propose alternative for small hydroelectric plants design (PCH) according to defined needs

  5. A modelling methodology for assessing the impact of climate variability and climatic change on hydroelectric generation

    International Nuclear Information System (INIS)

    Munoz, J.R.; Sailor, D.J.

    1998-01-01

    A new methodology relating basic climatic variables to hydroelectric generation was developed. The methodology can be implemented in large or small basins with any number of hydro plants. The method was applied to the Sacramento, Eel and Russian river basins in northern California where more than 100 hydroelectric plants are located. The final model predicts the availability of hydroelectric generation for the entire basin provided present and near past climate conditions, with about 90% accuracy. The results can be used for water management purposes or for analyzing the effect of climate variability on hydrogeneration availability in the basin. A wide range of results can be obtained depending on the climate change scenario used. (Author)

  6. Efficiency analysis of hydroelectric generating plants: A case study for Portugal

    International Nuclear Information System (INIS)

    Barros, Carlos Pestana

    2008-01-01

    This paper estimates changes in total productivity, breaking this down into technically efficient change and technological change, by means of data envelopment analysis (DEA) applied to the hydroelectric energy generating plants of EDP - the Portugal Electricity Company. The aim of this procedure is to seek out those best practices that will lead to improved performance in the energy market. We rank the plants according to their change in total productivity for the period 2001-2004, concluding that some plants experienced productivity growth while others experienced a decrease in productivity. The implications arising from the study are that EDP should adopt an internal benchmark management procedure in order to evaluate the relative position of each hydroelectric generating plant and to adopt managerial strategies designed to catch up with the frontier of 'best practices'. As the frontier is shifting along the time, constant efforts are needed in this respect along the time. (author)

  7. 78 FR 28826 - Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One...

    Science.gov (United States)

    2013-05-16

    ... Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One, LLC; Notice of..., Lakeport Hydroelectric Associates and Lakeport Hydroelectric Corporation (transferors) and Lakeport Hydroelectric One, LLC (transferee) filed an application for the transfer of license for the Lakeport Project...

  8. MODELING AND STUDY OF HYDROELECTRIC GENERATING SETS OF SMALL HYDRO POWER PLANTS WITH FREQUENCY-CONTROLLED PERMANENT MAGNET SYNCHRONOUS GENERATORS

    Directory of Open Access Journals (Sweden)

    R. I. Mustafayev

    2016-01-01

    Full Text Available Currently, the hydroelectric generating sets of small HPPs with Pelton turbines employ as their generating units conventional synchronous generators with electromagnetic excitation. To deal with the torque pulsatile behaviour, they generally install a supplementary flywheel on the system shaft that levels the pulsations. The Pelton turbine power output is adjusted by the needle changing water flow in the nozzle, whose advancement modifies the nozzle area and eventually – the flow. They limit the needle full stroke time to 20–40 sec. since quick shutting the nozzle for swift water flow reduction may result in pressure surges. For quick power adjustment so-called deflectors are employed, whose task is retraction of water jets from the Pelton turbine buckets. Thus, the mechanical method of power output regulation requires agreement between the needle stroke inside the turbine nozzles and the deflector. The paper offers employing frequency-controlled synchronous machines with permanent magnets qua generating units for the hydroelectric generating sets of small HPPs with Pelton turbines. The developed computer model reveals that this provides a higher level of adjustability towards rapid-changing loads in the grid. Furthermore, this will replace the power output mechanical control involving the valuable deflector drive and the turbine nozzle needles with electrical revolution rate and power output regulation by a frequency converter located in the generator stator circuit. Via frequency start, the controllable synchronous machine ensures stable operation of the hydroelectric generating set with negligibly small amount of water (energy carrier. Finally, in complete absence of water, the frequency-relay start facilitates shifting the generator operation to the synchronous capacitor mode, which the system operating parameter fluctograms obtained through computer modeling prove. 

  9. The impact of climate change on hydro-electricity generation

    Energy Technology Data Exchange (ETDEWEB)

    Musy, A.; Music, B.; Roy, R. [Ouranos, Montreal, PQ (Canada)

    2008-07-01

    Hydroelectricity is a clean and renewable energy source for many countries, and is expected to play an important role in future energy supplies. However, the impact of climatic change on hydroelectricity resources is not yet understood. This study provided a critical review of current methods used to determine the potential impacts of climatic change on hydroelectric power production. General circulation models (GCMs) are used to predict future climate conditions under various greenhouse gas (GHG) emissions scenarios. Statistical techniques are then used to down-scale GCM outputs to the appropriate scales needed for hydrological models, which are then used to simulate the effects of climatic change at regional and local scales. Outputs from the models are then used to develop water management models for hydroelectric power production. Observed linear trends in annual precipitation during the twentieth century were provided. The theoretical advantages and disadvantages of various modelling techniques were reviewed. Risk assessment strategies for Hydro-Quebec were also outlined and results of the study will be used to guide research programs for the hydroelectric power industry. refs., tabs., figs.

  10. The impact of climate change on hydro-electricity generation

    International Nuclear Information System (INIS)

    Musy, A.; Music, B.; Roy, R.

    2008-01-01

    Hydroelectricity is a clean and renewable energy source for many countries, and is expected to play an important role in future energy supplies. However, the impact of climatic change on hydroelectricity resources is not yet understood. This study provided a critical review of current methods used to determine the potential impacts of climatic change on hydroelectric power production. General circulation models (GCMs) are used to predict future climate conditions under various greenhouse gas (GHG) emissions scenarios. Statistical techniques are then used to down-scale GCM outputs to the appropriate scales needed for hydrological models, which are then used to simulate the effects of climatic change at regional and local scales. Outputs from the models are then used to develop water management models for hydroelectric power production. Observed linear trends in annual precipitation during the twentieth century were provided. The theoretical advantages and disadvantages of various modelling techniques were reviewed. Risk assessment strategies for Hydro-Quebec were also outlined and results of the study will be used to guide research programs for the hydroelectric power industry. refs., tabs., figs

  11. A Novel Hybrid Model for Short-Term Forecasting in PV Power Generation

    Directory of Open Access Journals (Sweden)

    Yuan-Kang Wu

    2014-01-01

    Full Text Available The increasing use of solar power as a source of electricity has led to increased interest in forecasting its power output over short-time horizons. Short-term forecasts are needed for operational planning, switching sources, programming backup, reserve usage, and peak load matching. However, the output of a photovoltaic (PV system is influenced by irradiation, cloud cover, and other weather conditions. These factors make it difficult to conduct short-term PV output forecasting. In this paper, an experimental database of solar power output, solar irradiance, air, and module temperature data has been utilized. It includes data from the Green Energy Office Building in Malaysia, the Taichung Thermal Plant of Taipower, and National Penghu University. Based on the historical PV power and weather data provided in the experiment, all factors that influence photovoltaic-generated energy are discussed. Moreover, five types of forecasting modules were developed and utilized to predict the one-hour-ahead PV output. They include the ARIMA, SVM, ANN, ANFIS, and the combination models using GA algorithm. Forecasting results show the high precision and efficiency of this combination model. Therefore, the proposed model is suitable for ensuring the stable operation of a photovoltaic generation system.

  12. Real-time energy resources scheduling considering short-term and very short-term wind forecast

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Marco; Sousa, Tiago; Morais, Hugo; Vale, Zita [Polytechnic of Porto (Portugal). GECAD - Knowledge Engineering and Decision Support Research Center

    2012-07-01

    This paper proposes an energy resources management methodology based on three distinct time horizons: day-ahead scheduling, hour-ahead scheduling, and real-time scheduling. In each scheduling process the update of generation and consumption operation and of the storage and electric vehicles storage status are used. Besides the new operation conditions, the most accurate forecast values of wind generation and of consumption using results of short-term and very short-term methods are used. A case study considering a distribution network with intensive use of distributed generation and electric vehicles is presented. (orig.)

  13. Simulation of the transient processes of load rejection under different accident conditions in a hydroelectric generating set

    Science.gov (United States)

    Guo, W. C.; Yang, J. D.; Chen, J. P.; Peng, Z. Y.; Zhang, Y.; Chen, C. C.

    2016-11-01

    Load rejection test is one of the essential tests that carried out before the hydroelectric generating set is put into operation formally. The test aims at inspecting the rationality of the design of the water diversion and power generation system of hydropower station, reliability of the equipment of generating set and the dynamic characteristics of hydroturbine governing system. Proceeding from different accident conditions of hydroelectric generating set, this paper presents the transient processes of load rejection corresponding to different accident conditions, and elaborates the characteristics of different types of load rejection. Then the numerical simulation method of different types of load rejection is established. An engineering project is calculated to verify the validity of the method. Finally, based on the numerical simulation results, the relationship among the different types of load rejection and their functions on the design of hydropower station and the operation of load rejection test are pointed out. The results indicate that: The load rejection caused by the accident within the hydroelectric generating set is realized by emergency distributing valve, and it is the basis of the optimization for the closing law of guide vane and the calculation of regulation and guarantee. The load rejection caused by the accident outside the hydroelectric generating set is realized by the governor. It is the most efficient measure to inspect the dynamic characteristics of hydro-turbine governing system, and its closure rate of guide vane set in the governor depends on the optimization result in the former type load rejection.

  14. Culinary and pressure irrigation water system hydroelectric generation

    Energy Technology Data Exchange (ETDEWEB)

    Christiansen, Cory [Water Works Engineers, Pleasant Grove City, UT (United States)

    2016-01-29

    Pleasant Grove City owns and operates a drinking water system that included pressure reducing stations (PRVs) in various locations and flow conditions. Several of these station are suitable for power generation. The City evaluated their system to identify opportunities for power generation that can be implemented based on the analysis of costs and prediction of power generation and associated revenue. The evaluation led to the selection of the Battle Creek site for development of a hydro-electric power generating system. The Battle Creek site includes a pipeline that carries spring water to storage tanks. The system utilizes a PRV to reduce pressure before the water is introduced into the tanks. The evaluation recommended that the PRV at this location be replaced with a turbine for the generation of electricity. The system will be connected to the utility power grid for use in the community. A pelton turbine was selected for the site, and a turbine building and piping system were constructed to complete a fully functional power generation system. It is anticipated that the system will generate approximately 440,000 kW-hr per year resulting in $40,000 of annual revenue.

  15. Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant

    Science.gov (United States)

    Che Munaaim, M. A.; Razali, N.; Ayob, A.; Hamidin, N.; Othuman Mydin, M. A.

    2018-03-01

    A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion) energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired to be embedded at the continuous flow of effluent discharge point of domestic sewerage treatment plant (STP). This research evaluates the potential of electricity generation from micro hydroelectric generator attached to 30,000 PE sewerage treatment plant. The power output obtained from calculation of electrical power conversion is used to identify the possibility of this system and its ability to provide electrical energy, which can minimize the cost of electric bill especially for the pumping system. The overview of this system on the practical application with the consideration of payback period is summarized. The ultimate aim of the whole application is to have a self-ecosystem electrical power generated for the internal use of STP by using its own flowing water in supporting the sustainable engineering towards renewable energy and energy efficient approach. The results shows that the output power obtained is lower than expected output power (12 kW) and fall beyond of the range of a micro hydro power (5kW - 100kW) since it is only generating 1.58 kW energy by calculation. It is also observed that the estimated payback period is longer which i.e 7 years to recoup the return of investment. A range of head from 4.5 m and above for the case where the flow shall at least have maintained at 0.05 m3/s in the selected plant in order to achieved a feasible power output. In conclusion, wastewater treatment process involves the flowing water (potential energy) especially at the effluent discharge point of STP is possibly harvested for electricity generation by embedding the micro hydroelectric generator. However, the selection of STP needs to have minimum 4.5 meter head with 0.05 m3/s of continuously flowing water to make

  16. Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant

    Directory of Open Access Journals (Sweden)

    Che Munaaim M.A.

    2018-01-01

    Full Text Available A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired to be embedded at the continuous flow of effluent discharge point of domestic sewerage treatment plant (STP. This research evaluates the potential of electricity generation from micro hydroelectric generator attached to 30,000 PE sewerage treatment plant. The power output obtained from calculation of electrical power conversion is used to identify the possibility of this system and its ability to provide electrical energy, which can minimize the cost of electric bill especially for the pumping system. The overview of this system on the practical application with the consideration of payback period is summarized. The ultimate aim of the whole application is to have a self-ecosystem electrical power generated for the internal use of STP by using its own flowing water in supporting the sustainable engineering towards renewable energy and energy efficient approach. The results shows that the output power obtained is lower than expected output power (12 kW and fall beyond of the range of a micro hydro power (5kW - 100kW since it is only generating 1.58 kW energy by calculation. It is also observed that the estimated payback period is longer which i.e 7 years to recoup the return of investment. A range of head from 4.5 m and above for the case where the flow shall at least have maintained at 0.05 m3/s in the selected plant in order to achieved a feasible power output. In conclusion, wastewater treatment process involves the flowing water (potential energy especially at the effluent discharge point of STP is possibly harvested for electricity generation by embedding the micro hydroelectric generator. However, the selection of STP needs to have minimum 4.5 meter head with 0.05 m3/s of continuously flowing

  17. Analysis of synchronous and induction generators used at hydroelectric power plant

    Science.gov (United States)

    Diniş, C. M.; Popa, G. N.; lagăr, A.

    2017-01-01

    In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.

  18. Determining generator parameters of Camargos hydroelectric power plant through frequency response measurement

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Sebastiao E.M. de; Padua Guarini, Antonio de [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Souza, Joao A. de; Valgas, Helio M; Pinto, Roberto del Giudice R. [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1994-12-31

    This work describes the results of the set frequency response tests performed in the generator number 2, 6.9 kV, 25 MVA, of Camargos hydroelectric power plant, CEMIG, and the parameters relatives to determined structures of model. This tests are unpublished in Brazil. (author) 7 refs., 16 figs., 7 tabs.

  19. Audit of long-term and short-term liabilities

    Directory of Open Access Journals (Sweden)

    Korinko M.D.

    2017-03-01

    Full Text Available The article determines the importance of long-term and short-term liabilities for the management of financial and material resources of an enterprise. It reviews the aim, objects and information generators for realization of audit of short-term and long-term obligations. The organizing and methodical providing of audit of long-term and short-term liabilities of an enterprise are generalized. The authors distinguish the stages of realization of audit of long-term and short-term liabilities, the aim of audit on each of the presented stages, and recommend methodical techniques. It is fixed that it is necessary to conduct the estimation of the systems of internal control and record-keeping of an enterprise by implementation of public accountant procedures for determination of volume and maintenance of selection realization. After estimating the indicated systems, a public accountant determines the methodology for realization of public accountant verification of long-term and short-term liabilities. The analytical procedures that public accountants are expedient to use for realization of audit of short-term and long-term obligations are determined. The authors suggest the classification of the educed defects on the results of the conducted public accountant verification of short-term and long-term obligations.

  20. Hydroelectric Power Plants Dobsina

    International Nuclear Information System (INIS)

    Majercak, V.; Srenkelova, Z.; Kristak, J.G.

    1997-01-01

    In this brochure the Hydroelectric Power Plants Dobsina, (VED), subsidiary of the utility Slovenske Elektrarne, a.s. (Slovak Electric, plc. Bratislava) are presented. VED is mainly aimed at generating peak-load electrical energy and maintenance of operational equipment. Reaching its goals, company is first of all focused on reliability of production, economy and effectiveness, keeping principles of work safety and industry safety standards and also ecology. VED operates eight hydroelectric power plants, from which PVE Ruzin I and PVE Dobsina I are pump storage ones and they are controlled directly by the Slovak Energy Dispatch Centre located in Zilina thought the system LS 3200. Those power plants participate in secondary regulation of electrical network of Slovakia. They are used to compensate balance in reference to foreign electrical networks and they are put into operation independently from VED. Activity of the branch is focused mainly on support of fulfilment of such an important aim as electric network regulation. Beginnings of the subsidiary Hydroelectric Power Plants Dobsina are related to the year of 1948. After commissioning of the pump storage Hydroelectric Power Plants Dobsina in 1953, the plant started to carry out its mission. Since that time the subsidiary has been enlarged by other seven power plants, through which it is fulfilling its missions nowadays. The characteristics of these hydroelectric power plants (The pump-storage power plant Dobsina, Small hydroelectric power plant Dobsina II, Small hydroelectric power plant Rakovec, Small hydroelectric power plant Svedlar, Hydroelectric power plant Domasa, The pump-storage power plant Ruzin, and Small hydroelectric power plant Krompachy) are described in detail. Employees welfare and public relations are presented

  1. Hydroelectricity at the crossroad: let us give a new momentum to the first renewable energy. White paper on hydroelectricity

    International Nuclear Information System (INIS)

    2017-01-01

    This publication first indicates some data which illustrate the role, importance and development perspectives of hydroelectricity in terms of energy production and in terms of jobs. It outlines that, due to its high adaptation capacity and flexibility, hydroelectricity is an important factor for territory development, that it has a major role in energy supply safety, in the energy mix, and in decentralised energy production. It proposes an overview of the different types of hydroelectric installations: reservoirs for a flexible production and supply safety, run of river hydro systems for a continuous and renewable energy production, pumped storage power stations for mass storage of electric energy. It proposes an overview of assets of hydroelectric energy: implementation of energy transition on the long term, development of an industrial sector of excellence, a responsible and supportive energy, compatibility between hydroelectricity, biodiversity and water usages. Proposals are then formulated to give electricity a new momentum: a new orientation of national and European policies for a better global consistency, a new orientation of economic choices and tax policy as incentives to maintenance and development of the hydroelectric sector, and a fair compensation of services provided to the electric power system

  2. Technological solutions of decentralized generation of hydroelectricity for those demands that cannot be attended by conventional electric with centralized generation

    Energy Technology Data Exchange (ETDEWEB)

    Signoretti, Valdir Tesche; Veras, Carlos Alberto Gurgel Rudi; Els, Henri Van [Universidade de Brasilia, Brasilia, DF (Brazil). Faculdade de Tecnologia. Dept. de Engenharia Mecanica], e-mail: gurgel@unb.br

    2010-07-01

    A source of energy stable and reliable and of acceptable cost is a basic requisite for the development of a given region can give-if full. Access to energy is important basis of human existence, essential to the satisfaction of basic needs such as food, clothing, and housing and also of mobility and communication. However, the dependency world burning of fossil fuels for energy generation and supply of a demand constantly increasing, both in industrialized countries and those in development, already threatening the ecological stability of the Earth. At the same time, conflicts by distribution of the last reserves these resources non-renewable threaten significantly to civil society. Adding to the breakneck speed in which humanity consumes the energetic sources and the obvious devastation of nature has an unequal distribution in consumption and access to energy. Renewable sources and energy efficiency are viable and necessary, especially because they can be the key to reduce wastefulness and extend the access to energy. In this way, there is a significant influence on economic and social inclusion of population excluded, generating employment and income with costs local and global environmental reduced compared to traditional forms and unsustainable generation and use of energy. This work is a study involving issues related to rural electrification from hydroelectricity, especially related to those isolated communities of the Amazon region that are lacking this form of energy, presented a general review since the origins of hydroelectricity in Brazil, as well as a national panorama electric exclusion as well as a scenario Amazon's supply of electricity. Finally presenting-if the main technologies available for hydroelectric generation for these isolated communities. (author)

  3. Environmental requirements at hydroelectric power plants

    International Nuclear Information System (INIS)

    Cada, G.F.

    1993-01-01

    Hydroelectric power is the most mature and widely implemented of the renewable energy technologies. The energy of flowing water has been used to perform work directly since ancient times, and the use of hydropower turbines to generate electricity traces back to the 19th century. Two commonly used turbine types, the Francis and Kaplan turbines, are essentially refinements of the simple reaction turbine of Hero of Alexandria, dating from about 100 B.C. (NAS 1976). Hydroelectric power production provides over 10% of the net electrical generation in the US, more than petroleum or natural gas and far more than the other renewable energy technologies combined. On a regional basis, hydroelectric power represents 14% of the net electrical power generation in the Rocky Mountain states and nearly 63% along the Pacific Coast. Those states that have the largest percentages of their electricity generated by hydropower (e.g., Idaho, Oregon, Montana, and Washington) also tend to have the lowest average cost of electricity per kilowatt-hour

  4. Analysis of the spontaneous variations in wind power and necessary continuous regulation of hydro-electric and thermal power, related to a future Swedish power system

    Energy Technology Data Exchange (ETDEWEB)

    Holm, J O; Lindstrom, P O

    1982-09-01

    Wind power is unlike conventional electric power generation, since the output fluctuates uncontrollably. These fluctuations must be balanced by controlled generation from other power sources. This will create new and interesting demands on the reserves in the power system. The short-term fluctuations have a low simultaneity factor and must be balanced by an automatic frequency control reserve. In Sweden, this consists of automatically controlled hydro-electric power. The report contains calculations of the amount by which the demand on reserves will increase when wind power is introduced.

  5. Cordova Lake dam hydroelectric generating station case study

    International Nuclear Information System (INIS)

    Kerr, D.; Huxley, J.

    1993-01-01

    The Ontario Ministry of Natural Resources released a Crown owned site to the private water power industry as part of the small hydro site release program initiated by the Ontario Government in the mid 1980's. The Cordova Lake Dam Hydroelectric Generating Station, built on this site, has been in operation since the first week of October, 1992. Since that time, the plant has been operating with less than 1 % down time and has generated over 2,400 MWh of electricity. Algonquin Power Systems is responsible for the management and operations of the plant which includes full time monitoring from the company's Mississauga office and a part time employee at Cordova Lake. Cordova Lake Dam is located on the Crowe River at the outlet of Cordova Lake, approximately 125 kilometers east of Toronto, Ontario. The total cost of the Cordova Lake Dam project was $1.6 million. Algonquin Power contributed 20% equity to the project. Algonquin Power was also responsible for all engineering and geotechnical work and for completing the construction and equipment contracts. 1 tab., 2 figs

  6. A three-stage short-term electric power planning procedure for a generation company in a liberalized market

    International Nuclear Information System (INIS)

    Nabona, Narcis; Pages, Adela

    2007-01-01

    In liberalized electricity markets, generation companies bid their hourly generation in order to maximize their profit. The optimization of the generation bids over a short-term weekly period must take into account the action of the competing generation companies and the market-price formation rules and must be coordinated with long-term planning results. This paper presents a three stage optimization process with a data analysis and parameter calculation, a linearized unit commitment, and a nonlinear generation scheduling refinement. Although the procedure has been developed from the experience with the Spanish power market, with minor adaptations it is also applicable to any generation company participating in a competitive market system. (author)

  7. Instream flow needs below peaking hydroelectric projects

    International Nuclear Information System (INIS)

    Milhous, R.T.

    1991-01-01

    This paper reports on a method developed to assist in the determination of instream flow needs below hydroelectric projects operated in a peaking mode. Peaking hydroelectric projects significantly change streamflow over a short period of time; consequently, any instream flow methodology must consider the dual flows associated with peaking projects. The dual flows are the lowest flow and the maximum generation flow of a peaking cycle. The methodology is based on elements of the Physical Habitat Simulation System of the U.S. Fish and Wildlife Service and uses habitat, rather than fish numbers or biomas, as at basic response variable. All aquatic animals are subject to the rapid changes in streamflow which cause rapid swings in habitat quality. Some aquatic organisms are relatively fixed in location in the stream while others can move when flows change. The habitat available from a project operated in peaking mode is considered to be the minimum habitat occurring during a cycle of habitat change. The methodology takes in to consideration that some aquatic animals can move and others cannot move during a peaking cycle

  8. Competitive analysis of small hydroelectric power plants

    International Nuclear Information System (INIS)

    Assad, L.S.; Placido, R.

    1990-01-01

    The agreement between CPFL/UNICAMP/EFEI for developing energetic planning of Small Hydroelectric Power Plants construction is described. Some notions for showing the more economic alternative between decide by Small Hydroelectric Power Plants construction and continue supply the market by inter ligated system generation are shown in this stage of the agreement. (author)

  9. Power market liberalisation: an opportunity for the hydroelectricity?

    International Nuclear Information System (INIS)

    Loth, P.

    2001-01-01

    This article discusses the future of hydroelectricity in the light of the ongoing liberalisation of the European power market. Compared to fossil electricity, hydroelectricity is a renewable energy source, has a limited impact on the environment, is able to meet strong variations of power demand, but is a little bit more costly. Hydroelectric companies expect the introduction of a quality label for their product as well as the increasing awareness of consumers for environmental aspects to become strong incentives for them to subscribe on green energy despite its higher cost. The cost difference will also be partly reduced by the introduction of a pollution tax on fossil energy sources. Figures on hydroelectricity capacity production, currently and in the near future, in the countries surrounding the Alps are presented. As an example, the business strategy of a Swiss electricity utility is shortly described

  10. Carbon emission as a function of energy generation in hydroelectric reservoirs in Brazilian dry tropical biome

    International Nuclear Information System (INIS)

    Ometto, Jean P.; Cimbleris, André C.P.; Santos, Marco A. dos; Rosa, Luiz P.; Abe, Donato; Tundisi, José G.; Stech, José L.; Barros, Nathan; Roland, Fábio

    2013-01-01

    Most energy generation globally is fueled by coal and oil, raising concerns about greenhouse gas emissions. Hydroelectric reservoirs are anthropogenic aquatic systems that occur across a wide geographical extent, and, in addition to their importance for energy production, they have the potential to release two important greenhouse gases (GHGs), carbon dioxide and methane. We report results from an extensive study of eight hydroelectric reservoirs located in central and southeastern tropical Brazil. In the Brazilian dry tropical biome reservoirs, emissions (in tons of CO 2 Eq. per MW h) varied from 0.01 to 0.55, and decreased with reservoir age. Total emissions were higher in the reservoir lake when compared to the river downstream the dam; however, emissions per unit area, in the first kilometer of the river after the dam, were higher than that in the reservoir. The results showed, despite higher carbon emissions per energy production in the youngest reservoirs, lower emission from hydroelectric reservoirs from the studied region in relation to thermo electrical supply, fueled by coal or fossil fuel. The ratio emission of GHG per MWh produced is an important parameter in evaluating the service provided by hydroelectric reservoir and for energy planning policies. - Highlights: ► Hydroelectric reservoirs construction is growing worldwide. ► The effect of hydropower reservoir in the carbon cycle is dependent on environment characteristics. ► Carbon emissions per energy production are higher in the youngest tropical savannah reservoirs. ► Methane emissions decrease with reservoir age in tropical savannah reservoirs. ► In general, the effect of hydropower in the carbon cycle is lower than other energy sources

  11. Private affairs [Canon del Pato hydroelectric project

    International Nuclear Information System (INIS)

    Moxon, S.

    1997-01-01

    The privatisation of the electric power industry in Peru has caused growth in its hydroelectric generation capacity. Increased interest in hydroelectric power, based on economic considerations, had led to decision on upgrading the two main hydropower plants which will provide almost 100 MW of extra capacity over a three year period, and provide competitively priced electric power. (UK)

  12. The Hydroelectric Business Unit of Ontario Power Generation Inc

    International Nuclear Information System (INIS)

    Gaboury, J.

    2001-01-01

    The focus of this presentation was on the generation and sale of electricity. Prior to deregulation, companies that generated electricity had a readily available customer base to whom the electricity could be sold. The author discussed some of the changes affecting the industry as a result of deregulation of the electricity market in Ontario: the increasing number of companies, as well as the increased number of generators supplying power within the province. Currently 85 per cent of the generation in Ontario is met by Ontario Power Generation (OPG) and this percentage will decrease through de-control. De-control can be achieved in a variety of ways, either through the sale of assets, leases, asset swaps. The market rules dictate that OPG not control in excess of 35 per cent of the generation supply in Ontario, OPG is examining the situation. New supply being constructed or new interconnections with neighboring markets could affect the total assets that would have to be de-controlled. OPG has a mix of generation that includes hydroelectric, fossil, and nuclear, as well as a single wind turbine. Green power, defined as electricity generation deemed less intrusive environmentally than most traditional generation, includes wind, water, landfill gas, solar and others, and could affect the mix of generation. It is expected that there will be a niche market for green power, especially when one considers the reduction in emissions. It could represent a viable option for smaller startup companies, as less capital is required. The options for selling the power, either to the spot market or by entering into a bilateral contract with another customer, were explained

  13. Lateral Vibration of Hydroelectric Generating Set with Different Supporting Condition of Thrust Pad

    OpenAIRE

    Si, Xiaohui; Lu, Wenxiu; Chu, Fulei

    2011-01-01

    The variations of the supporting condition, which change the stiffness of tilting pad thrust bearing, may alter the dynamic behavior of the rotor system. The effects of supporting condition of thrust pad on the lateral vibration of a hydroelectric generating set are investigated in this paper. The action of a thrust bearing is described as moments acting on the thrust collar, and the tilting stiffness coefficients of thrust bearing are calculated. A model based on typical beam finite element ...

  14. Productivity and efficiency analysis of privatized hydroelectric generation with a sometimes free input

    Science.gov (United States)

    Halabi, Claudia Elizabeth

    2000-10-01

    In this paper I use a stochastic distance frontier approach to assess the performance of Chile's hydroelectric industry, which operates within a regulatory framework designed to achieve a competitive outcome. An occasionally free input, water, is the sole energy input. The econometric analysis indicates substantial technical and allocative inefficiencies as well as volatile productivity scores, due presumably to the volatility of the energy input. Some allocative inefficiencies have diminished dramatically as the time under deregulation has grown. The Lerner index suggests that firms in the industry enjoy some degree of market power, reflected by prices that exceed marginal costs. This market power is consistent with operation within a centralized dispatch center, as predicted by a strategic bidding model. I also find that run-of-river plants exhibit increasing returns to scale, while plants relying on dams show slightly diminishing returns. The shadow marginal cost for run-of-river plants is found to be close to zero. Substantial cost savings could be realized if firms in Chile's hydro-electric generation industry were to operate efficiently.

  15. Short-term generation scheduling model of Fujian hydro system

    Energy Technology Data Exchange (ETDEWEB)

    Wang Jinwen [School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China)], E-mail: dr.jinwen.wang@gmail.com

    2009-04-15

    The Fujian hydropower system (FHS) is one of the provincial hydropower systems with the most complicated hydraulic topology in China. This paper describes an optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to aid the shift engineers in making decisions with the short-term hydropower scheduling such that the generation benefit can be maximal. The problem involves 27 reservoirs and is formulated as a nonlinear and discrete programming. It is a very challenging task to solve such a large-scale problem. In this paper, the Lagrangian multipliers are introduced to decompose the primal problem into a hydro subproblem and many individual plant-based subproblems, which are respectively solved by the improved simplex-like method (SLM) and the dynamic programming (DP). A numerical example is given and the derived solution is very close to the optimal one, with the distance in benefit less than 0.004%. All the data needed for the numerical example are presented in detail for further tests and studies from more experts and researchers.

  16. Short-term generation scheduling model of Fujian hydro system

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Jinwen [School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2009-04-15

    The Fujian hydropower system (FHS) is one of the provincial hydropower systems with the most complicated hydraulic topology in China. This paper describes an optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to aid the shift engineers in making decisions with the short-term hydropower scheduling such that the generation benefit can be maximal. The problem involves 27 reservoirs and is formulated as a nonlinear and discrete programming. It is a very challenging task to solve such a large-scale problem. In this paper, the Lagrangian multipliers are introduced to decompose the primal problem into a hydro subproblem and many individual plant-based subproblems, which are respectively solved by the improved simplex-like method (SLM) and the dynamic programming (DP). A numerical example is given and the derived solution is very close to the optimal one, with the distance in benefit less than 0.004%. All the data needed for the numerical example are presented in detail for further tests and studies from more experts and researchers. (author)

  17. Small hydroelectric power stations and their reality

    International Nuclear Information System (INIS)

    Kamenski, Miroslav

    1999-01-01

    Construction of a small hydroelectric power station provides additional amounts of electric energy, engages a private capital, revives investment activities and promotes the use of renewable energy sources. Transmission losses are reduced, a voltage of higher quality is achieved and idle power is compensated by the generation of electricity in the small hydroelectric power stations and at the place of consumption. Legislation and technical regulations, however, require a multidisciplinary approach, defining of complex spaces and environmental protection. Unfortunately, complete documents should be prepared for small,hydroelectric plants just as for big ones what is a long procedure and many of those papers are unnecessary or even superfluous. (Author)

  18. Climate change and hydroelectric production

    International Nuclear Information System (INIS)

    Raban, R.R.

    1991-01-01

    Manitoba Hydro is planning for the possibility of climate change, which has the potential to adversely effect its hydroelectric generating potential. Theoretical and physical evidence for a global warming are reviewed, and it is shown that some of Manitoba Hydro's own measurements support a warming hypothesis. The most significant effect on the hydraulic generating system would be associated with diminished river flows. Winter hydraulic generation capability would be reduced if the magnitude of the change were sufficient to cause several freeze-ups and break-ups within a given season. Incidence of transmission line icing would probably increase, permafrost recession may undermine tower foundations, and conductor resistance may increase to increase energy loss. Ice crossings and winter roads would be adversely affected, and a restriction on fossil fuel consumption could limit thermal generation and increase demand for hydroelectric or nuclear energy. Manitoba Hydro is examining a number of no-cost or low-cost options to accomodate potential climate change, using probable maximum precipitation hydrologic technology, research into conductor galloping, line icing detection, and hydrological investigations

  19. Grid-connected in-stream hydroelectric generation based on the doubly fed induction machine

    Science.gov (United States)

    Lenberg, Timothy J.

    Within the United States, there is a growing demand for new environmentally friendly power generation. This has led to a surge in wind turbine development. Unfortunately, wind is not a stable prime mover, but water is. Why not apply the advances made for wind to in-stream hydroelectric generation? One important advancement is the creation of the Doubly Fed Induction Machine (DFIM). This thesis covers the application of a gearless DFIM topology for hydrokinetic generation. After providing background, this thesis presents many of the options available for the mechanical portion of the design. A mechanical turbine is then specified. Next, a method is presented for designing a DFIM including the actual design for this application. In Chapter 4, a simulation model of the system is presented, complete with a control system that maximizes power generation based on water speed. This section then goes on to present simulation results demonstrating proper operation.

  20. A model optimization for pre-dispatch among the hydroelectric generator unities; Um modelo de otimizacao para pre-despacho entre as unidades geradoras de hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Colnago, Glauber R.; Correia, Paulo B. [Universidade Estadual de Campinas (UNICAMP), Campinas, SP (Brazil). Faculdade de Engenharia Mecanica]. E-mails: grcolnago@fem.unicamp.br; pcorreia@fem.unicamp.br

    2006-07-01

    This work proposes a mixed integer nonlinear programming model to pre-dispatch of a hydroelectric power plant. In the model we want to minimize the losses in the electricity generation with conditions of electricity demand, operational prohibited zones and units' efficiency data. The Xingo Hydroelectric Power Plant was utilized in the mode tests. The solver used was Lingo 8.0. (author)

  1. Very Short-term Nonparametric Probabilistic Forecasting of Renewable Energy Generation - with Application to Solar Energy

    DEFF Research Database (Denmark)

    Golestaneh, Faranak; Pinson, Pierre; Gooi, Hoay Beng

    2016-01-01

    Due to the inherent uncertainty involved in renewable energy forecasting, uncertainty quantification is a key input to maintain acceptable levels of reliability and profitability in power system operation. A proposal is formulated and evaluated here for the case of solar power generation, when only...... approach to generate very short-term predictive densities, i.e., for lead times between a few minutes to one hour ahead, with fast frequency updates. We rely on an Extreme Learning Machine (ELM) as a fast regression model, trained in varied ways to obtain both point and quantile forecasts of solar power...... generation. Four probabilistic methods are implemented as benchmarks. Rival approaches are evaluated based on a number of test cases for two solar power generation sites in different climatic regions, allowing us to show that our approach results in generation of skilful and reliable probabilistic forecasts...

  2. Analysis of the Level-Release Polynomial from a Hydroelectric Plant

    Directory of Open Access Journals (Sweden)

    Ieda Hidalgo

    2012-02-01

    Full Text Available The mathematic representation of the tailrace elevation as function of the water release can be modified, for example, by the geomorphologic impact of large floods. The level-release polynomial from a hydroelectric plant is important information to computational models used for optimization and simulation of the power generation systems operation. They depend on data quality to provide reliable results. Therefore, this paper presents a method for adjusting of the tailrace polynomial based on operation data recorded by the plant’s owner or company. The proposed method uses a non-linear regression tool, such as Trendline in Excel. A case study has been applied to the data from a large Brazilian hydroelectric plant whose operation is under the coordination of the Electric System ational Operator. The benefits of the data correction are analyzed using a simulation model for the hydroelectric plants operation. This simulator is used to reproduce the past operation of the plant, first with official data and second with adjusted data. The results show significant improvements in terms of quality of the data, contributing to bring the real and simulated operation closer.

  3. Supervised guiding long-short term memory for image caption generation based on object classes

    Science.gov (United States)

    Wang, Jian; Cao, Zhiguo; Xiao, Yang; Qi, Xinyuan

    2018-03-01

    The present models of image caption generation have the problems of image visual semantic information attenuation and errors in guidance information. In order to solve these problems, we propose a supervised guiding Long Short Term Memory model based on object classes, named S-gLSTM for short. It uses the object detection results from R-FCN as supervisory information with high confidence, and updates the guidance word set by judging whether the last output matches the supervisory information. S-gLSTM learns how to extract the current interested information from the image visual se-mantic information based on guidance word set. The interested information is fed into the S-gLSTM at each iteration as guidance information, to guide the caption generation. To acquire the text-related visual semantic information, the S-gLSTM fine-tunes the weights of the network through the back-propagation of the guiding loss. Complementing guidance information at each iteration solves the problem of visual semantic information attenuation in the traditional LSTM model. Besides, the supervised guidance information in our model can reduce the impact of the mismatched words on the caption generation. We test our model on MSCOCO2014 dataset, and obtain better performance than the state-of-the- art models.

  4. Estimates of hydroelectric generation using neural networks with the artificial bee colony algorithm for Turkey

    International Nuclear Information System (INIS)

    Uzlu, Ergun; Akpınar, Adem; Özturk, Hasan Tahsin; Nacar, Sinan; Kankal, Murat

    2014-01-01

    The primary objective of this study was to apply the ANN (artificial neural network) model with the ABC (artificial bee colony) algorithm to estimate annual hydraulic energy production of Turkey. GEED (gross electricity energy demand), population, AYT (average yearly temperature), and energy consumption were selected as independent variables in the model. The first part of the study compared ANN-ABC model performance with results of classical ANN models trained with the BP (back propagation) algorithm. Mean square and relative error were applied to evaluate model accuracy. The test set errors emphasized positive differences between the ANN-ABC and classical ANN models. After determining optimal configurations, three different scenarios were developed to predict future hydropower generation values for Turkey. Results showed the ANN-ABC method predicted hydroelectric generation better than the classical ANN trained with the BP algorithm. Furthermore, results indicated future hydroelectric generation in Turkey will range from 69.1 to 76.5 TWh in 2021, and the total annual electricity demand represented by hydropower supply rates will range from 14.8% to 18.0%. However, according to Vision 2023 agenda goals, the country plans to produce 30% of its electricity demand from renewable energy sources by 2023, and use 20% less energy than in 2010. This percentage renewable energy provision cannot be accomplished unless changes in energy policy and investments are not addressed and implemented. In order to achieve this goal, the Turkish government must reconsider and raise its own investments in hydropower, wind, solar, and geothermal energy, particularly hydropower. - Highlights: • This study is associated with predicting hydropower generation in Turkey. • Sensitivity analysis was performed to determine predictor variables. • GEED, population, energy consumption and AYT were used as predictor variables. • ANN-ABC predicted the hydropower generation more accurately

  5. BLUE GOLD: HYDRO-ELECTRIC RENT IN CANADA

    OpenAIRE

    Glenn Jenkins; RICHARD ZUKER

    1984-01-01

    In this study, an attempt is made to develop estimates of the value of economic rent from production of hydro-electricity. These estimates are made for the year 1979, which is the latest period for which a comprehensive set of data was available at the time this work was undertaken. The estimates are developed for the hydro-electricity generated (or used) by electric utilities in four provinces: Quebec (including Churchill Falls), Ontario, Manitoba and British Columbia. These electric systems...

  6. Hydroelectric power generation assessment for Russia: Cooperation in a mutual transfer of technology

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, M.F. [Harza Engineering Co., Chicago, IL (United States); Meloy, G.R. [Army Corps of Engineers, Lake Oswego, OR (United States); Semenkov, A.V. [Energopromtechnika Group Ltd., Moscow (Russian Federation)

    1995-12-31

    In September 1993, Russian Federation Prime Minister Chernomyrdin and United States Vice President Gore agreed on a joint study to examine options for Russia`s energy future. The objective of the study would be to develop a long-term, comprehensive program for the Russian power sector. A joint Russian-American program was established by the United States government. This program was charged to assess all aspects of the Russian energy sector, including conservation, thermal energy, nuclear energy, transmission line systems, and hydropower energy. The objective of the hydropower energy assessment aspect of the study was to prepare a time-phased investment plan for the period 1995 to 2000 for expansion of the existing hydroelectric energy production. The Hydropower Assessment Project required a close working relationship between engineers from the United States and the Russian Federation. The Project Team was given unprecedented access to design and economic data of existing and planned hydropower projects in the Russian Federation. This paper presents the methodology of the hydropower generation assessment for Russia, focusing on the partnering of American and Russian engineers, which led to a mutual transfer of technology and a successful project.

  7. Enhanced bioelectricity generation of air-cathode buffer-free microbial fuel cells through short-term anolyte pH adjustment.

    Science.gov (United States)

    Ren, Yueping; Chen, Jinli; Li, Xiufen; Yang, Na; Wang, Xinhua

    2018-04-01

    Short-term initial anolyte pH adjustment can relieve the performance deterioration of the single-chamber air-cathode buffer-free microbial fuel cell (BFMFC) caused by anolyte acidification. Adjusting the initial anolyte pH to 9 in 5 running cycles is the optimum strategy. The relative abundance of the electrochemically active Geobacter in the KCl-pH9-MFC anode biofilm increased from 59.01% to 75.13% after the short-term adjustment. The maximum power density (P max ) of the KCl-pH9-MFC was elevated from 316.4mW·m -2 to 511.6mW·m -2 , which was comparable with that of the PBS-MFC. And, after the short-term adjusting, new equilibrium between the anolyte pH and the anode biofilm electrochemical activity has been established in the BFMFC, which ensured the sustainability of the improved bioelectricity generation performance. Copyright © 2017 Elsevier B.V. All rights reserved.

  8. Battle looms over hydroelectric dam relicensing

    International Nuclear Information System (INIS)

    Simpson, J.

    1993-01-01

    Environmental groups, buoyed by support from influential lawmakers, are vowing to change the Federal Energy Regulatory Commission's (FERC's) hydroelectric relicensing procedures. For too long, the groups say, the hydroelectric industry has benefitted from a cozy relationship with the FERC, which has emphasized economic over environmental considerations. The success or failure of the environmentalists agenda will likely prove critical to the hydroelectric industry. With 237 hydroelectric licenses up for renewal this year - the most ever considered by the FERC in one year - and four vacant seats at the Commission, FERC hydro policy appears poised for upheaval. The groups have proposed a multipoint program to address perceived shortcomings in the FERC's hydroelectric relicensing procedures. The program includes recommendations to: Shorten dam licenses (which currently stretch 30 to 50 years) and require the FERC to periodically reevaluate the terms of hydropower licenses; Increase Congressional oversight of the FERC to assure adherence to environmental laws, including the National Environmental Policy Act, which mandates the preparation of environmental impact statements where appropriate; Mandate facilities for upstream and downstream fish passage; Establish a mitigation fund, collectable from dam owners, for river conservation and restoration programs; Promote all alternatives to relicensing projects, including denial of project licenses; and Reassign the FERC's hydropower jurisdiction to another federal agency, such as the Environmental Protection Agency or the Department of the Interior

  9. Climate change impacts on high-elevation hydroelectricity in California

    Science.gov (United States)

    Madani, Kaveh; Guégan, Marion; Uvo, Cintia B.

    2014-03-01

    While only about 30% of California's usable water storage capacity lies at higher elevations, high-elevation (above 300 m) hydropower units generate, on average, 74% of California's in-state hydroelectricity. In general, high-elevation plants have small man-made reservoirs and rely mainly on snowpack. Their low built-in storage capacity is a concern with regard to climate warming. Snowmelt is expected to shift to earlier in the year, and the system may not be able to store sufficient water for release in high-demand periods. Previous studies have explored the climate warming effects on California's high-elevation hydropower by focusing on the supply side (exploring the effects of hydrological changes on generation and revenues) ignoring the warming effects on hydroelectricity demand and pricing. This study extends the previous work by simultaneous consideration of climate change effects on high-elevation hydropower supply and pricing in California. The California's Energy-Based Hydropower Optimization Model (EBHOM 2.0) is applied to evaluate the adaptability of California's high-elevation hydropower system to climate warming, considering the warming effects on hydroelectricity supply and pricing. The model's results relative to energy generation, energy spills, reservoir energy storage, and average shadow prices of energy generation and storage capacity expansion are examined and discussed. These results are compared with previous studies to emphasize the need to consider climate change effects on hydroelectricity demand and pricing when exploring the effects of climate change on hydropower operations.

  10. Short-term LNG-markets

    International Nuclear Information System (INIS)

    Eldegard, Tom; Lund, Arne-Christian; Miltersen, Kristian; Rud, Linda

    2005-01-01

    The global Liquefied Natural Gas (LNG) industry has experienced substantial growth in the past decades. In the traditional trade patterns of LNG the product has typically been handled within a dedicated chain of plants and vessels fully committed by long term contracts or common ownership, providing risk sharing of large investments in a non-liquid market. Increasing gas prices and substantial cost reductions in all parts of the LNG chain have made LNG projects viable even if only part of the capacity is secured by long-term contracts, opening for more flexible trade of the remainder. Increasing gas demand, especially in power generation, combined with cost reductions in the cost of LNG terminals, open new markets for LNG. For the LNG supplier, the flexibility of shifting volumes between regions represents an additional value. International trade in LNG has been increasing, now accounting for more than one fifth of the world's cross-border gas trade. Despite traditional vertical chain bonds, increased flexibility has contributed in fact to an increasing LNG spot trade, representing 8% of global trade in 2002. The focus of this paper is on the development of global short-term LNG markets, and their role with respect to efficiency and security of supply in European gas markets. Arbitrage opportunities arising from price differences between regional markets (such as North America versus Europe) are important impetuses for flexible short-term trade. However, the short-term LNG trade may suffer from problems related to market access, e.g. limited access to terminals and regulatory issues, as well as rigidities connected to vertical binding within the LNG chain. Important issues related to the role of short-term LNG-trade in the European gas market are: Competition, flexibility in meeting peak demand, security of supply and consequences of differences in pricing policies (oil-linked prices in Europe and spot market prices in North America). (Author)

  11. The uranium industry: long-term planning for short-term competition

    International Nuclear Information System (INIS)

    Vottero, X.; Georges Capus, G.

    2001-01-01

    Long term planning for short term competition Today, uranium producers face new challenges in terms of both production (new regulatory, environmental and social constraints) and market conditions (new sources of uranium supply, very low prices and tough competition). In such a context, long-term planning is not just a prerequisite to survive in the nuclear fuel cycle industry. In fact, it also contributes to sustaining nuclear electricity generation facing fierce competition from other energy sources in increasingly deregulated markets. Firstly, the risk of investing in new mining projects in western countries is growing because, on the one hand, of very erratic market conditions and, on the other hand, of increasingly lengthy, complex and unpredictable regulatory conditions. Secondly, the supply of other sources of uranium (uranium derived from nuclear weapons, uranium produced in CIS countries, ...) involve other risks, mainly related to politics and commercial restrictions. Consequently, competitive uranium supply requires not only technical competence but also financial strength and good marketing capabilities in order to anticipate long-term market trends, in terms of both demand and supply. It also requires taking into account new parameters such as politics, environment, regulations, etc. Today, a supplier dedicated to the sustainable production of nuclear electricity must manage a broad range of long-term risks inherent to the procurement of uranium. Taking into account all these parameters in a context of short-term, fast-changing market is a great challenge for the future generation. World Uranium Civilian Supply and Demand. (authors)

  12. Entropy method combined with extreme learning machine method for the short-term photovoltaic power generation forecasting

    International Nuclear Information System (INIS)

    Tang, Pingzhou; Chen, Di; Hou, Yushuo

    2016-01-01

    As the world’s energy problem becomes more severe day by day, photovoltaic power generation has opened a new door for us with no doubt. It will provide an effective solution for this severe energy problem and meet human’s needs for energy if we can apply photovoltaic power generation in real life, Similar to wind power generation, photovoltaic power generation is uncertain. Therefore, the forecast of photovoltaic power generation is very crucial. In this paper, entropy method and extreme learning machine (ELM) method were combined to forecast a short-term photovoltaic power generation. First, entropy method is used to process initial data, train the network through the data after unification, and then forecast electricity generation. Finally, the data results obtained through the entropy method with ELM were compared with that generated through generalized regression neural network (GRNN) and radial basis function neural network (RBF) method. We found that entropy method combining with ELM method possesses higher accuracy and the calculation is faster.

  13. Central hydroelectric of Santa Ana

    International Nuclear Information System (INIS)

    Pardo A, German

    2000-01-01

    The paper is related to the construction of an alternating tunnel of conduction to take advantage of the available hydraulic load among the Wiesner Plant and Santa Ana's tanks and of Suba, works required to build a hydroelectric power station with a generation capacity of approximately of 12 MW

  14. Development of an HTS hydroelectric power generator for the hirschaid power station

    Energy Technology Data Exchange (ETDEWEB)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin, E-mail: ruben.fair@converteam.co [Advanced Technology Group, Converteam, Rugby, CV21 1BD (United Kingdom)

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  15. A least squares approach for efficient and reliable short-term versus long-term optimization

    DEFF Research Database (Denmark)

    Christiansen, Lasse Hjuler; Capolei, Andrea; Jørgensen, John Bagterp

    2017-01-01

    The uncertainties related to long-term forecasts of oil prices impose significant financial risk on ventures of oil production. To minimize risk, oil companies are inclined to maximize profit over short-term horizons ranging from months to a few years. In contrast, conventional production...... optimization maximizes long-term profits over horizons that span more than a decade. To address this challenge, the oil literature has introduced short-term versus long-term optimization. Ideally, this problem is solved by a posteriori multi-objective optimization methods that generate an approximation...... the balance between the objectives, leaving an unfulfilled potential to increase profits. To promote efficient and reliable short-term versus long-term optimization, this paper introduces a natural way to characterize desirable Pareto points and proposes a novel least squares (LS) method. Unlike hierarchical...

  16. Short Term Electric Production Technology Switching Under Carbon Cap and Trade

    Directory of Open Access Journals (Sweden)

    Donald F. Larson

    2012-10-01

    Full Text Available This study examines fuel switching in electricity production following the introduction of the European Union’s Emissions Trading System (EU ETS for greenhouse gas emissions. A short-run restricted cost equation is estimated with carbon permits, high-carbon fuels, and low carbon fuels as variable inputs. Shadow values and substitution elasticities for carbon-free energy resources from nuclear, hydroelectric and renewable sources are imputed from the cost equation. The empirical analysis examines 12 European countries using monthly data on fuel use, prices, and electricity generation during the first phase of the European Emissions Trading System. Despite low emission permit prices, this study finds statistically significant substitution between fossil fuels and carbon free sources of energy for electric power production. Significant substitution between fossil fuels and nuclear energy also was found. Still, while 18 of the 20 substitution elasticities are statistically significant, they are all less than unity, consistent with limited substitution. Overall, these results suggest that prices for carbon emission permits relative to prices for carbon and carbon free sources of energy do matter but that electric power producers have limited operational flexibility in the short-run to satisfy greenhouse gas emission limits.

  17. Independence of long-term contextual memory and short-term perceptual hypotheses: Evidence from contextual cueing of interrupted search.

    Science.gov (United States)

    Schlagbauer, Bernhard; Mink, Maurice; Müller, Hermann J; Geyer, Thomas

    2017-02-01

    Observers are able to resume an interrupted search trial faster relative to responding to a new, unseen display. This finding of rapid resumption is attributed to short-term perceptual hypotheses generated on the current look and confirmed upon subsequent looks at the same display. It has been suggested that the contents of perceptual hypotheses are similar to those of other forms of memory acquired long-term through repeated exposure to the same search displays over the course of several trials, that is, the memory supporting "contextual cueing." In three experiments, we investigated the relationship between short-term perceptual hypotheses and long-term contextual memory. The results indicated that long-term, contextual memory of repeated displays neither affected the generation nor the confirmation of short-term perceptual hypotheses for these displays. Furthermore, the analysis of eye movements suggests that long-term memory provides an initial benefit in guiding attention to the target, whereas in subsequent looks guidance is entirely based on short-term perceptual hypotheses. Overall, the results reveal a picture of both long- and short-term memory contributing to reliable performance gains in interrupted search, while exerting their effects in an independent manner.

  18. Short-term energy outlook annual supplement, 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the third quarter of 1993 through the fourth quarter of 1994. Values for the second quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding

  19. Pollution and power generation: environmental implications Small Hydroelectric Plants of Sao Paulo

    Directory of Open Access Journals (Sweden)

    Giorgia Limnios

    2015-06-01

    Full Text Available The current situation of water scarcity of of São Paulo State, manifested as imminent risk of shortages in major urban areas, has led not only to issues concerning preservation of water resources, but also problems related to energy availability, identified in a series of expeditions field carried out under the project " Electricity History of the State of Sao Paulo (1890-1960: Industrial Heritage , Landscape and Environment – Electromemory II”. The objective of this project is to study an extremely representative set of power plants and small hydroelectric power plants built during the initial period of electrification of the State of São Paulo – Brazil (1890-1960, along with its evolution within the social, historical and geographical aspects, to highlight the landscape changes resulting from the electrification process, as well as beneficiaries and impacts on landscape during the study period. In all visits, in addition to the problem of water scarcity, we verified that the power plants face generation constraints related to severe water pollution, either by diffuse or point sources. Some studies conducted in Brazil have analyzed the interference of pollution in power generation , highlighting the role of diffuse sources such as solid waste, sediments from areas with strong erosion, lubricant oils from vehicles or the development of invasive species, particularly as macrophytes, causative agents of biochemical changes that promote the formation of chemical compounds able to erode the electromechanical equipment of the plants or even prevent the flow of water intake into the same. The power plants covered by Electromemory II Project scope have these same problems, which prompted the need to establish a relationship between pollution in its various forms and the generation of electricity. To establish this bridge, the survey of publications and technical reports was necessary as well asresearches inenvironmental legislation

  20. Short-term optimal wind power generation capacity in liberalized electricity markets

    International Nuclear Information System (INIS)

    Olsina, Fernando; Roescher, Mark; Larisson, Carlos; Garces, Francisco

    2007-01-01

    Mainly because of environmental concerns and fuel price uncertainties, considerable amounts of wind-based generation capacity are being added to some deregulated power systems. The rapid wind development registered in some countries has essentially been driven by strong subsidizing programs. Since wind investments are commonly isolated from market signals, installed wind capacity can be higher than optimal, leading to distortions of the power prices with a consequent loss of social welfare. In this work, the influence of wind generation on power prices in the framework of a liberalized electricity market has been assessed by means of stochastic simulation techniques. The developed methodology allows investigating the maximal wind capacity that would be profitably deployed if wind investments were subject to market conditions only. For this purpose, stochastic variables determining power prices are accurately modeled. A test system resembling the size and characteristics of the German power system has been selected for this study. The expected value of the optimal, short-term wind capacity is evaluated for a considerable number of random realizations of power prices. The impact of dispersing the wind capacity over statistical independent wind sites has also been evaluated. The simulation results reveal that fuel prices, installation and financing costs of wind investments are very influential parameters on the maximal wind capacity that might be accommodated in a market-based manner

  1. Finland, Sweden and Austria doubled the share of hydroelectric power in EU

    International Nuclear Information System (INIS)

    Kangas, H.

    1996-01-01

    New EU countries Finland, Sweden and Austria increased the amount of hydroelectric power produced in EU in 1995 by more than 50 % compared to the year 1994. Especially Sweden and Austria are very dependent on hydroelectric power; the share of hydroelectric power is in Austria more than 70 % and even in Sweden it was nearly 50 %. The share of hydroelectric power in 1995 the EU region was 14 % of the total power demand. Due to the new EU countries the share of hydroelectric power of the total electric power demand, which would have decreased, increased by over 3 %. The increase of the electric power demand in Finland was lowest in the EU region, about 1.0 %, while it was in Greece 5.0 % and in Spain about 4.6 %. The share of nuclear power in the EU region was about 35 % in 1995. The most nuclear power dependent country in the EU was France there the share of nuclear power of the total electric power demand was 89 %. Both Finland and Sweden increased the production of back-pressure power generation in 1995. The share of back-pressure power generation in EU in 1995 was about 50 TWh which corresponds to some 1.5 % of the total electric power demand. About 50 % of the total electric power generation in EU was produced by condensing power generation. This production increased by 10 % compared to 1994. The netimport of electric power of EU increased by 80 % in Finland and Sweden, which are large importers of electric power outside the EU region

  2. Risks in the operation of hydroelectric power plants and nuclear power in Brazil

    International Nuclear Information System (INIS)

    Goldemberg, J.

    1986-01-01

    A comparison between the utilization of electrical energy generated by hydroelectric power plant and nuclear power plant is made. The risks from nuclear installations and the environmental effects of hydroelectric power plants and nuclear power plants are presented. (E.G.) [pt

  3. Wind as a feasible alternative source for improving the deficiency of hydroelectricity in Tanzania

    International Nuclear Information System (INIS)

    Kainkwa, R. M.

    2006-01-01

    Hydroelectricity is the main source of electricity in Tanzania since about 86% of the electricity generated is from this source. During the dry season there is normally a storage of water in the dams and as such the electricity generated is below the demand. In 2004 a natural gas power plant was inaugurated to alleviate this shortage of electricity. When generating electricity from natural gas, exotic gases are emitted which pollute our environment. This source of energy also cannot regenerate itself within the human life scale. Wind is a renewable source that can be used to supplement the shortage of hydroelectricity in Tanzania. Wind speed data collected from a location with high wind energy potential shows that electricity can be generated from the wind to alleviate this shortage of hydroelectricity. Wind and rainfall data demonstrate further that the windy season, which is from July to November coincide with the dry season in which the use of wind energy in electric generation can help to fill the gap of the hydroelectricity that prevails during that season. The use of wind instead of natural gas will reduce the environmental pollution that results from extracting energy from the fossil fuel source.(Author)

  4. Hydroelectricity: an asset for a successful energy transition in France

    International Nuclear Information System (INIS)

    Galland, J.C.; Vincent, E.

    2013-01-01

    France's national debate on energy transition has served as a reminder that hydroelectric power plays a significant role in French electricity production. With installed power totalling 25400 MW at end 2012 (the second largest in Europe), France's hydroelectric plants produced 63.8 TWh last year (the third largest in Europe), almost 12% of total output. It is France's second largest means of producing electricity and it represents more than 80% of production of renewable energy. A source of energy developed a long time ago, thus benefiting from technological maturity, hydroelectricity can be produced in large quantity at the heart of France's regions, while also rendering indispensable service for the equilibrium of the French electricity system by compensating the intermittency of other renewable energy sources. The production costs of hydroelectric power are the lowest among all power generation technologies. (authors)

  5. Hydroelectricity and sustainable development

    International Nuclear Information System (INIS)

    Dubeau, D.

    1995-01-01

    From 1975 to 1992, hydroelectricity helped reduce greenhouse gas emissions in Quebec by 20%. For Hydro-Quebec, energy conservation and hydroelectric development are basic complementary tools for sustainable development. Recent studies show that developing only 50% of economically exploitable hydroelectric potential (30% of the gross theoretical potential) of different regions worldwide would considerably reduce greenhouse gas and SO 2 emissions. However, hydroelectric systems produce environmental and social impacts locally that require mitigative measures. To fulfill its mandate in a sustainable development context, Hydro-Quebec has adopted methods such as integrated resource planning, the assessment of externalities, multi criteria decision tools and public participations

  6. On the short-term predictability of fully digital chaotic oscillators for pseudo-random number generation

    KAUST Repository

    Radwan, Ahmed Gomaa

    2014-06-18

    This paper presents a digital implementation of a 3rd order chaotic system using the Euler approximation. Short-term predictability is studied in relation to system precision, Euler step size and attractor size and optimal parameters for maximum performance are derived. Defective bits from the native chaotic output are neglected and the remaining pass the NIST SP. 800-22 tests without post-processing. The resulting optimized pseudorandom number generator has throughput up to 17.60 Gbits/s for a 64-bit design experimentally verified on a Xilinx Virtex 4 FPGA with logic utilization less than 1.85%.

  7. On the short-term predictability of fully digital chaotic oscillators for pseudo-random number generation

    KAUST Repository

    Radwan, Ahmed Gomaa; Mansingka, Abhinav S.; Salama, Khaled N.; Zidan, Mohammed A.

    2014-01-01

    This paper presents a digital implementation of a 3rd order chaotic system using the Euler approximation. Short-term predictability is studied in relation to system precision, Euler step size and attractor size and optimal parameters for maximum performance are derived. Defective bits from the native chaotic output are neglected and the remaining pass the NIST SP. 800-22 tests without post-processing. The resulting optimized pseudorandom number generator has throughput up to 17.60 Gbits/s for a 64-bit design experimentally verified on a Xilinx Virtex 4 FPGA with logic utilization less than 1.85%.

  8. Hydroelectric power and hydroelectric power plants. V. 1

    International Nuclear Information System (INIS)

    1991-06-01

    Following the oil crises of 1973 and 1979, there was renewed and justifiable interest in small hydroelectric plants. The maximum power of these plants rarely exceeds 10 MW, and their development will surely increase in the coming decades. Hydraulic power is a national renewable resource, unaffected by geopolitical problems, and above all, non polluting. Many countries with their own hydraulic resources in both the industrialized and the developing world have expressed needs for the development of small hydroelectric plants. Hidroenergia 91 Conference is the opportunity to take stock of knowledge gained in the vast field of small hydroelectric plants. The meeting is divided into four subjects: 1 methods for decision aid; 2 environmental impact and accompanying answers; 3 national development policy; 4 world market and international cooperation. This meeting contains 75 papers, 8 papers are in the INIS scope and 72 papers are in the ENERGY DATA BASE scope

  9. Heat and electricity generating methods

    International Nuclear Information System (INIS)

    Buter, J.

    1977-01-01

    A short synopsis on the actual methods of heating of lodgings and of industrial heat generation is given. Electricity can be generated in steam cycles heated by burning of fossil fuels or by nuclear energy. A valuable contribution to the electricity economy is produced in the hydroelectric power plants. Besides these classical methods, also the different procedures of direct electricity generation are treated: thermoelectric, thermionic, magnetohydrodynamic power sources, solar and fuel cells. (orig.) [de

  10. An adaptive random search for short term generation scheduling with network constraints.

    Directory of Open Access Journals (Sweden)

    J A Marmolejo

    Full Text Available This paper presents an adaptive random search approach to address a short term generation scheduling with network constraints, which determines the startup and shutdown schedules of thermal units over a given planning horizon. In this model, we consider the transmission network through capacity limits and line losses. The mathematical model is stated in the form of a Mixed Integer Non Linear Problem with binary variables. The proposed heuristic is a population-based method that generates a set of new potential solutions via a random search strategy. The random search is based on the Markov Chain Monte Carlo method. The main key of the proposed method is that the noise level of the random search is adaptively controlled in order to exploring and exploiting the entire search space. In order to improve the solutions, we consider coupling a local search into random search process. Several test systems are presented to evaluate the performance of the proposed heuristic. We use a commercial optimizer to compare the quality of the solutions provided by the proposed method. The solution of the proposed algorithm showed a significant reduction in computational effort with respect to the full-scale outer approximation commercial solver. Numerical results show the potential and robustness of our approach.

  11. Short-Term and Long-Term Educational Mobility of Families: A Two-Sex Approach.

    Science.gov (United States)

    Song, Xi; Mare, Robert D

    2017-02-01

    We use a multigenerational perspective to investigate how families reproduce and pass their educational advantages to succeeding generations. Unlike traditional mobility studies that have typically focused on one-sex influences from fathers to sons, we rely on a two-sex approach that accounts for interactions between males and females-the process in which males and females mate and have children with those of similar educational statuses and jointly determine the educational status attainment of their offspring. Using data from the Panel Study of Income Dynamics, we approach this issue from both a short-term and a long-term perspective. For the short term, grandparents' educational attainments have a direct association with grandchildren's education as well as an indirect association that is mediated by parents' education and demographic behaviors. For the long term, initial educational advantages of families may benefit as many as three subsequent generations, but such advantages are later offset by the lower fertility of highly educated persons. Yet, all families eventually achieve the same educational distribution of descendants because of intermarriages between families of high- and low-education origin.

  12. Short-term scheduling of an open-pit mine with multiple objectives

    Science.gov (United States)

    Blom, Michelle; Pearce, Adrian R.; Stuckey, Peter J.

    2017-05-01

    This article presents a novel algorithm for the generation of multiple short-term production schedules for an open-pit mine, in which several objectives, of varying priority, characterize the quality of each solution. A short-term schedule selects regions of a mine site, known as 'blocks', to be extracted in each week of a planning horizon (typically spanning 13 weeks). Existing tools for constructing these schedules use greedy heuristics, with little optimization. To construct a single schedule in which infrastructure is sufficiently utilized, with production grades consistently close to a desired target, a planner must often run these heuristics many times, adjusting parameters after each iteration. A planner's intuition and experience can evaluate the relative quality and mineability of different schedules in a way that is difficult to automate. Of interest to a short-term planner is the generation of multiple schedules, extracting available ore and waste in varying sequences, which can then be manually compared. This article presents a tool in which multiple, diverse, short-term schedules are constructed, meeting a range of common objectives without the need for iterative parameter adjustment.

  13. Research of hydroelectric generating set low-frequency vibration monitoring system based on optical fiber sensing

    Science.gov (United States)

    Min, Li; Zhang, Xiaolei; Zhang, Faxiang; Sun, Zhihui; Li, ShuJuan; Wang, Meng; Wang, Chang

    2017-10-01

    In order to satisfy hydroelectric generating set low-frequency vibration monitoring, the design of Passive low-frequency vibration monitoring system based on Optical fiber sensing in this paper. The hardware of the system adopts the passive optical fiber grating sensor and unbalanced-Michelson interferometer. The software system is used to programming by Labview software and finishing the control of system. The experiment show that this system has good performance on the standard vibration testing-platform and it meets system requirements. The frequency of the monitoring system can be as low as 0.2Hz and the resolution is 0.01Hz.

  14. Presentation plan of the reconstruction and upgrade hydroelectric power plant 'Zvornik'

    Directory of Open Access Journals (Sweden)

    Krstić Dušan B.

    2016-01-01

    Full Text Available By the basic project of the energy utilization of the middle part of the river Drina (from Višegrad to Zvornik building of five large hydroelectric power plants was planned. Hydroelectric power plant near Zvornik had the greatest advantage, and it is the first built. Hydroelectric power plant 'Zvornik' separates the river Drina, about 1 km upstream from Mali Zvornik in Serbia and Zvornik in Bosnia and Herzegovina. In order to extend the work life, by the urban development project was planned modernization of production aggregates and associated equipment, the upgrade of annexes above the aggregate siphons A1 and A2, as well as the upgrade of the annexes of the powerhouse on the right bank of the river in the function of accommodation of electrical equipment. By replacing of the vital parts of turbines with increasing diameter with an increase of efficiency, Bow and power, as well as replacing generators with new generator of higher power with excitation and all the necessary auxiliary equipment, will ensure reliable operation of the hydroelectric power plant and will extend the working life of the next 40 years, creating opportunities for retrofitting additional fifth unit.

  15. 78 FR 62616 - Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer...

    Science.gov (United States)

    2013-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3730-005] Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer of Exemption 1. By letter filed September 23, 2013, Salmon Creek Hydroelectric Company informed the Commission that they have...

  16. An estimation of the capacity to produce hydrogen by wasted hydroelectric energy for the three largest Brazilian hydroelectric

    Energy Technology Data Exchange (ETDEWEB)

    Padilha, Janine C.; Trindade, Leticia G. da; Souza, Roberto F. de [Universidade Federal do Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil). Inst. of Chemistry], Email: janine@iq.ufrgs.br; Miguel, Marcelo [Itaipu Binacional, Foz do Iguacu, PR (Brazil)

    2010-07-01

    The use of water wasted in hydroelectric plants as normalization dam excess, which constitute a hydrodynamic potential useful to generate electric energy which can be subsequently used to produce hydrogen and its subsequent consumption in fuel cells has been considered as an alternative for hydraulic energy-rich countries like Brazil. The case is examined in which all the water wasted in the hydroelectric plants, spilled by dam gates to maintain acceptable water levels, from the 3 largest Brazilian hydroelectric plants was used to produce hydrogen. During the year of 2008, the electric energy produced from this utilization would have been equivalent to 52.8 TWh, an amount that corresponds to an increase of ca. 15% of the total electric energy produced in the country. Furthermore, if this amount of hydrogen was used in the replacement of internal combustion vehicles by fuel cells, this would have prevented the production of 2.26 x 10{sup 7} ton of Co{sub 2} per year. This plan would also significantly decrease production and release of greenhouse gases. (author)

  17. Production capacity of equipment for medium and large hydroelectric power plant in China

    Energy Technology Data Exchange (ETDEWEB)

    Huang Shenyang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents an overview on the production capacity of equipment for medium and large hydroelectric power plant in China. The document approaches general aspects, production capability and testing facilities related to Francis, Kaplan, tubular and impulse hydroelectric generating sets, and the introduction of main manufacturers as well.

  18. Fish and hydroelectricity

    International Nuclear Information System (INIS)

    Zorpette, G.

    1990-01-01

    This paper reports on the problems that hydroelectric plants have regarding fish populations. The utilities that operate these plants are finding that accommodating migrating fish presents unique engineering challenges, not the least of which involves designing and building systems to protect fish species whose migratory behavior remains something of a mystery. Where such systems cannot be built, the status of hydroelectric dams may be in doubt, as is now the case with several dams in the United States. A further twist in some regions in the possibility that certain migratory fish will be declared threatened or endangered-a development that could wreak havoc on the hydroelectric energy supply in those regions

  19. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  20. Canton hydroelectric project: feasibility study. Final report, appendices

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)

  1. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  2. Feasibility determination of hydroelectric power generation at Patillas Reservoir, Puerto Rico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Huetter, J.J. Jr.

    1979-02-01

    The overall feasibility of retrofit for hydroelectric power generation at the Patillas Reservoir, an existing impoundment located near the town of Patillas, Puerto Rico, was studied. The scope of work and project intent is limited to establishing valid acceptance or non-acceptance criteria for this specific site as an example of power generation potential at existing dams of relatively low head (less than or equal to 20 m) in the United States. Information is included on hydrologic conditions at the site, retrofit plant design, economic analysis, environmental, legal, social and institutional aspects, and availability of plant equipment. It is concluded that generation of hydropower at Patillas is entirely practical and uncomplicated from an engineering viewpoint, has no adverse environmental effects and is economically justifiable for the island of Puerto Rico. The final agency or contractor roles for development are reasonably well-established. There are no prohibitory laws or regulations concerning this development. In fact, according to Puerto Rico legislation, such hydropower developments appear to be mandated. The installed capacity of the site ranges from 665 kW to approximately 1500 kW depending on extent of development of the available options. (LCL)

  3. Feasibility assessment, Lowell Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-04-01

    The results are presented of a feasibility analysis for hydroelectric generating facilities on the Merrimack River at Lowell, Massachusetts. The projected facility would utilize the existing Pawtucket Dam and a portion of the existing Northern Canal. The project was examined for economic, engineering, and environmental viability, and the results are favorable. The owners intend to proceed to the next step of negotiating a firm power purchase agreement.

  4. Production costs: U.S. hydroelectric power plants, 4th Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The book provides 1991 operation and maintenance expenses for over 800 conventional and pumped-storage hydroelectric power plants. Report shows operator and plant name, plant year-in-service, installed capacity, 1991 net generation, O ampersand M expenses, total production costs and current plant capitalization. Fifty eight percent of the utility-owned hydroelectric plants in the US are covered by this report. Data diskette provides additional capital and production cost accounts and number of employees for each plant

  5. The political economy of Canadian hydro-electricity : between old provincial hydros and neoliberal regional energy regimes

    International Nuclear Information System (INIS)

    Netherton, A.

    2007-01-01

    In economic terms, hydro-electricity is considered as a quasi-staple, as it prone to the classic staples problem of excess capacity. However, neither water nor hydroelectricity in Canada is produced primarily for export markets. Hydroelectric systems are often thought of as politicized monopolies. This paper discussed changes that have occurred in hydroelectric organizations over time, as they have been governed by a formative mixed regime; postwar provincial hydro systems; a megaprojects regime; and an emerging sustainability regionalization regime. The origins of electricity generation and transmission in Canada were discussed, as well as the ecological footprint of large mega-projects on rivers. The development of provincial hydro monopolies during the mid- to late- twentieth century was also outlined, as well as the sustainability and regionalization regime that developed after 1990. During the mature staples period of the mid-century, rents in hydro-electric organizations were distributed through cheap rates to subsidize and facilitate the development of mass production and mass consumption. However, post-staples consumption has now replaced mass consumption, and demand side management is replacing earlier cheap power policies. Nonetheless, the lack of systematic integration of networks has led to inefficiencies. Provincial grids are now being integrated into interconnected North American regional networks regulated by the United States. It was concluded that the Canadian electricity regime is increasingly influenced by the the supranational role that the United States is playing in structuring markets. 83 refs

  6. Short-Term Photovoltaic Power Generation Forecasting Based on Multivariable Grey Theory Model with Parameter Optimization

    Directory of Open Access Journals (Sweden)

    Zhifeng Zhong

    2017-01-01

    Full Text Available Owing to the environment, temperature, and so forth, photovoltaic power generation volume is always fluctuating and subsequently impacts power grid planning and operation seriously. Therefore, it is of great importance to make accurate prediction of the power generation of photovoltaic (PV system in advance. In order to improve the prediction accuracy, in this paper, a novel particle swarm optimization algorithm based multivariable grey theory model is proposed for short-term photovoltaic power generation volume forecasting. It is highlighted that, by integrating particle swarm optimization algorithm, the prediction accuracy of grey theory model is expected to be highly improved. In addition, large amounts of real data from two separate power stations in China are being employed for model verification. The experimental results indicate that, compared with the conventional grey model, the mean relative error in the proposed model has been reduced from 7.14% to 3.53%. The real practice demonstrates that the proposed optimization model outperforms the conventional grey model from both theoretical and practical perspectives.

  7. Pediatric polytrauma : Short-term and long-term outcomes

    NARCIS (Netherlands)

    vanderSluis, CK; Kingma, J; Eisma, WH; tenDuis, HJ

    Objective: To assess the short-term and long-term outcomes of pediatric polytrauma patients and to analyze the extent to which short-term outcomes can predict long-term outcomes. Materials and Methods: Ail pediatric polytrauma patients (Injury Severity Score of greater than or equal to 16, less than

  8. Mitigation and recovery of methane emissions from tropical hydroelectric dams

    Energy Technology Data Exchange (ETDEWEB)

    Bambace, L.A.W.; Ramos, F.M.; Lima, I.B.T.; Rosa, R.R. [Instituto Nacional de Pesquisas Espaciais (INPE), Sao Jose dos Campos (Brazil)

    2007-06-15

    Tropical hydroelectric reservoirs generally constitute an appreciable source of methane to the atmosphere. This paper proposes simple mitigation and recovery procedures to substantially reduce atmospheric methane emissions from hydroelectric reservoirs. We aim at transforming existing methane stocks of tropical reservoirs into a clean, renewable energy source. The recovered gas methane may be pumped to large consuming centers, stocked locally and burned in gas turbines to generate electricity during high demand periods, or even purified for transport applications. Our simulations show that the use of biogenic methane may increase considerably the energy supply in countries like Brazil. As a result, it would be possible to reduce the need of additional hydroelectric dams, protecting important pristine biomes, and avoiding the resettlement of villages and indigenous reserves. (author)

  9. Short-Term Energy Outlook: Quarterly projections. Fourth quarter 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-05

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the fourth quarter of 1993 through the fourth quarter of 1994. Values for the third quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications.

  10. Dynamics of Total Microcystin LR Concentration in Three Subtropical Hydroelectric Generation Reservoirs in Uruguay, South America.

    Science.gov (United States)

    González-Piana, Mauricio; Fabián, Daniel; Piccardo, Andrea; Chalar, Guillermo

    2017-10-01

    This study analyzed the temporal dynamics of total microcystin LR concentrations between the years of 2012 and 2015 in the Bonete, Baygorria and Palmar hydroelectric generation reservoirs in the central region of the Negro River, Uruguay. The three reservoirs showed differents total microcystin LR concentration, with no significant differences among them. Over 20 sampling dates, the three reservoirs exhibited total microcystin LR concentrations on eight occasions that corresponded to a slight to moderate human health risk according to WHO guideline values for recreational waters. By determining the concentration of microcystin LR in cyanobacterial biomass, we identified cyanobacterial populations that occurred over time with varying degrees of toxin production (maximal 85.4 µg/mm 3 ). The microcystin LR concentration in Bonete was positively correlated with temperature (r = 0.587) and cyanobacterial biomass (r = 0.736), in Baygorria with cyanobacterial biomass (r = 0.521), and in Palmar with temperature (r = 0.500) and negatively correlated with ammonia (r = -0.492). Action is needed to reduce the presence of toxic cyanobacteria in these systems. A decrease in the use of agrochemicals and management changes in the reservoir basins could be successful long-term measures.

  11. Emissions from hydroelectric reservoirs and comparison of hydroelectricity, natural gas and oil

    International Nuclear Information System (INIS)

    Gagnon, L.; Chamberland, A.

    1993-01-01

    When reservoirs are created, a small fraction of the flooded organic matter decomposes into humic acids, carbon dioxide (CO 2 ), methane (CH 4 ), nitrogen, phosphorus, and other elements. The major greenhouse gases produced are CO 2 and CH 4 . For northern projects, Canadian studies on emissions from hydroelectric reservoirs have reached similar conclusions: Emissions, including methane, are less than 35 kg CO 2 equivalent per MWh. Using a typical project in northern Quebec as the basis for analysis, none of the studies dispute the considerable advantages of hydroelectricity regarding greenhouse gas emissions. Taking into account all components of energy systems, emissions of greenhouse gases from natural-gas power plants are 24 to 26 times greater than emissions from hydroelectric plants. The Freshwater Institute, in an article published in Ambio suggests that emissions from hydroelectric plants could be a significant source of greenhouse gases. This conclusion does not apply to most hydroelectric projects for two reasons: First, the Freshwater Institute's studies concerned flooded peatlands and shallow reservoirs that are not typical of most hydro projects; and second, the Institute analyzed a hydro project with a ratio of flooded area to energy production that is 6 to 10 times higher than typical projects in Canada. 7 refs, 4 tabs

  12. Resuming growth in Latin America: short and long term policies

    Directory of Open Access Journals (Sweden)

    Julio Lopez G.

    2008-09-01

    Full Text Available The authors of this paper assert that the paralysis of the state generated by the crises of the 1970s and 1980s deprived the economies of the region of an important lever to resume and sustain growth. They thus maintain that to overcome stagnation it will be necessary to reconstruct the state's capacity to implement pro-growth policies. Following Keynes and Kalecki's ideas, but also classical development economists, the authors argue, first, that short-term macroeconomic policies, to reduce unemployment and to increase the degree of capacity utilization, should be used to promote the generation of profits to firms and to wake up entrepreneurs' animal spirits. Short-term expansionary policies should be coupled with measures to improve competitiveness and avoid balance of payments problems. They also claim that alternatives to the liberal programme will fail unless a pro-growth strategy is adopted which includes both short- and long-term policies. They thus propose that long-term policies must complete the package, signaling: a sustained increases of effective demand in the future; and b investment priorities to ensure that capacities will be created in strategic sectors and branches of the economy.

  13. Short-Term Forecasting of Electric Energy Generation for a Photovoltaic System

    Directory of Open Access Journals (Sweden)

    Dinh V.T.

    2018-01-01

    Full Text Available This article presents a short-term forecast of electric energy output of a photovoltaic (PV system towards Tomsk city, Russia climate variations (module temperature and solar irradiance. The system is located at Institute of Non-destructive Testing, Tomsk Polytechnic University. The obtained results show good agreement between actual data and prediction values.

  14. Long-term associative learning predicts verbal short-term memory performance

    OpenAIRE

    Jones, Gary; Macken, Bill

    2017-01-01

    Studies using tests such as digit span and nonword repetition have implicated short-term memory across a range of developmental domains. Such tests ostensibly assess specialized processes for the short-term manipulation and maintenance of information that are often argued to enable long-term learning. However, there is considerable evidence for an influence of long-term linguistic learning on performance in short-term memory tasks that brings into question the role of a specialized short-term...

  15. Long-term associative learning predicts verbal short-term memory performance.

    Science.gov (United States)

    Jones, Gary; Macken, Bill

    2018-02-01

    Studies using tests such as digit span and nonword repetition have implicated short-term memory across a range of developmental domains. Such tests ostensibly assess specialized processes for the short-term manipulation and maintenance of information that are often argued to enable long-term learning. However, there is considerable evidence for an influence of long-term linguistic learning on performance in short-term memory tasks that brings into question the role of a specialized short-term memory system separate from long-term knowledge. Using natural language corpora, we show experimentally and computationally that performance on three widely used measures of short-term memory (digit span, nonword repetition, and sentence recall) can be predicted from simple associative learning operating on the linguistic environment to which a typical child may have been exposed. The findings support the broad view that short-term verbal memory performance reflects the application of long-term language knowledge to the experimental setting.

  16. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Science.gov (United States)

    2011-10-05

    ... Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and a preliminary application document to license its proposed Sutton Hydroelectric Project No. 12693. The project would be located at the U.S. Army Corps of Engineers' (Corps...

  17. Defect production in simulated cascades: cascade quenching and short-term annealing

    International Nuclear Information System (INIS)

    Heinisch, H.L.

    1982-01-01

    Defect production in high energy displacement cascades has been modeled using the computer code MARLOWE to generate the cascades and the stochastic computer code ALSOME to simulate the cascade quenching and short-term annealing of isolated cascades. The quenching is accomplished by using ALSOME with exaggerated values for defect mobilities and critical reaction distanes for recombination and clustering, which are in effect until the number of defect pairs is equal to the value determined from resistivity experiments at 4K. Then normal mobilities and reaction distances are used during short-term annealing to a point representative of Stage III recovery. Effects of cascade interactions at low fluences are also being investigated. The quenching parameter values were empirically determined for 30 keV cascades. The results agree well with experimental information throughout the range from 1 keV to 100 keV. Even after quenching and short-term annealing the high energy cascades behave as a collection of lower energy subcascades and lobes. Cascades generated in a crystal having thermal displacements were found to be in better agreement with experiments after quenching and annealing than those generated in a non-thermal crystal

  18. Energy harvesting from hydroelectric systems for remote sensors

    Directory of Open Access Journals (Sweden)

    Joaquim Azevedo

    2016-10-01

    Full Text Available Hydroelectric systems are well-known for large scale power generation. However, there are virtually no studies on energy harvesting with these systems to produce tens or hundreds of milliwatts. The goal of this work was to study which design parameters from large-scale systems can be applied to small-scale systems. Two types of hydro turbines were evaluated. The first one was a Pelton turbine which is suitable for high heads and low flow rates. The second one was a propeller turbine used for low heads and high flow rates. Several turbine geometries and nozzle diameters were tested for the Pelton system. For the propeller, a three-bladed turbine was tested for different heads and draft tubes. The mechanical power provided by these turbines was measured to evaluate the range of efficiencies of these systems. A small three-phase generator was developed for coupling with the turbines in order to evaluate the generated electric power. Selected turbines were used to test battery charging with hydroelectric systems and a comparison between several efficiencies of the systems was made.

  19. Fiscal 2000 report on the international joint verification of photovoltaic power generation system. Verification of hybrid system comprising photovoltaic power generation system and micro-hydroelectric power generation systems; 2000 nendo taiyoko hatsuden system kokusai kyodo jissho kaihatsu hokokusho. Taiyoko micro suiryoku hybrid system jissho kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    Research was conducted in Vietnam for the development of a hybrid system comprising a photovoltaic power generation system and a micro-hydroelectric power generation system. In verification test operation, data measurement had been under way for approximately 18 months since it was started in September 1999. The rate of days on which effective data were obtained throughout this period was 93.4%. Power generated by the micro-hydroelectric power generation system was 19.4kWh/d with so small a capacity factor of 3.2%. The capacity factor of the photovoltaic power generation system was again very small at 4.5% since the amount consumed by the load was as small as 131.0kWh/d. Weather data of solar radiation and precipitation were being collected smoothly. In the study of hybrid system optimization, the effect of inductor generator activation upon the inverter was taken up. In the study of capacity balance optimization between the constituent elements of the hybrid system, methodology was established and verified, and calculations were carried out. (NEDO)

  20. Small hydroelectric engineering practice

    CERN Document Server

    Leyland, Bryan

    2014-01-01

    Small Hydroelectric Engineering Practice is a comprehensive reference book covering all aspects of identifying, building, and operating hydroelectric schemes between 500 kW and 50 MW. In this range of outputs there are many options for all aspects of the scheme and it is very important that the best options are chosen.As small hydroelectric schemes are usually built against a limited budget it is extremely important that the concept design is optimum and every component is designed to maximise the benefi t and minimise the cost. As operating costs are often a high proportion of the income it i

  1. A fuzzy inference model for short-term load forecasting

    International Nuclear Information System (INIS)

    Mamlook, Rustum; Badran, Omar; Abdulhadi, Emad

    2009-01-01

    This paper is concerned with the short-term load forecasting (STLF) in power system operations. It provides load prediction for generation scheduling and unit commitment decisions, and therefore precise load forecasting plays an important role in reducing the generation cost and the spinning reserve capacity. Short-term electricity demand forecasting (i.e., the prediction of hourly loads (demand)) is one of the most important tools by which an electric utility/company plans, dispatches the loading of generating units in order to meet system demand. The accuracy of the dispatching system, which is derived from the accuracy of the forecasting algorithm used, will determine the economics of the operation of the power system. The inaccuracy or large error in the forecast simply means that load matching is not optimized and consequently the generation and transmission systems are not being operated in an efficient manner. In the present study, a proposed methodology has been introduced to decrease the forecasted error and the processing time by using fuzzy logic controller on an hourly base. Therefore, it predicts the effect of different conditional parameters (i.e., weather, time, historical data, and random disturbances) on load forecasting in terms of fuzzy sets during the generation process. These parameters are chosen with respect to their priority and importance. The forecasted values obtained by fuzzy method were compared with the conventionally forecasted ones. The results showed that the STLF of the fuzzy implementation have more accuracy and better outcomes

  2. Environment and hydroelectricity colloquium - Synthesis

    International Nuclear Information System (INIS)

    Aelbrecht, Denis; Abadie, Marc; Baril, Dominique; Delacoux, Jean-Yves; Delaunay, Alexis; Loudiere, Daniel; Penalba, Anne; Pont, Didier; Rocq, Sylvie; Roult, Didier; Sheibani, Neda; Thevenet, Regis; Weisrock, Ghislain

    2010-10-01

    This document proposes a synthesis of a colloquium dedicated to the interactions between hydroelectric installations and the environment. The four sessions respectively addressed the impacts of hydroelectric installations on ecosystems and more particularly on pisciculture populations (strategies for migration restoration, development of fish-friendly turbines), the sedimentary management of hydroelectric installations, the implementation of the Water Framework European Directive (Austrian experience, biological assessment criteria), and examples of environmental integration of existing or projected installations

  3. Comparison of different chaotic maps in particle swarm optimization algorithm for long-term cascaded hydroelectric system scheduling

    International Nuclear Information System (INIS)

    He Yaoyao; Zhou Jianzhong; Xiang Xiuqiao; Chen Heng; Qin Hui

    2009-01-01

    The goal of this paper is to present a novel chaotic particle swarm optimization (CPSO) algorithm and compares the efficiency of three one-dimensional chaotic maps within symmetrical region for long-term cascaded hydroelectric system scheduling. The introduced chaotic maps improve the global optimal capability of CPSO algorithm. Moreover, a piecewise linear interpolation function is employed to transform all constraints into restrict upriver water level for implementing the maximum of objective function. Numerical results and comparisons demonstrate the effect and speed of different algorithms on a practical hydro-system.

  4. Present status and perspectives for hydroelectric power in world

    International Nuclear Information System (INIS)

    Malquori, E.

    1991-01-01

    In the note a review of the present status and perspectives of hydroelectric power in the world is introduced. The present status regards, in chronological order, the last decade, as to say the works carried out in the 80ies whereas the perspectives regard the next twenty years as to say until 2010. The mentioned electric power potentiality refers to pure generation plants of great, middle and small size and to what could be achieved by already existing plants after changes and/or replacements and improvement of the machinery. Beside the figures regarding powers, great generation and pumping plants whose contribution has been and will be remarkable have been properly mentioned. The Italian contribution - civil works design, construction, and machinery supply - in the last hydroelectric development is briefly mentioned with particular reference to the developing countries

  5. Stochastic Optimal Wind Power Bidding Strategy in Short-Term Electricity Market

    DEFF Research Database (Denmark)

    Hu, Weihao; Chen, Zhe; Bak-Jensen, Birgitte

    2012-01-01

    Due to the fluctuating nature and non-perfect forecast of the wind power, the wind power owners are penalized for the imbalance costs of the regulation, when they trade wind power in the short-term liberalized electricity market. Therefore, in this paper a formulation of an imbalance cost...... minimization problem for trading wind power in the short-term electricity market is described, to help the wind power owners optimize their bidding strategy. Stochastic optimization and a Monte Carlo method are adopted to find the optimal bidding strategy for trading wind power in the short-term electricity...... market in order to deal with the uncertainty of the regulation price, the activated regulation of the power system and the forecasted wind power generation. The Danish short-term electricity market and a wind farm in western Denmark are chosen as study cases due to the high wind power penetration here...

  6. Evaluation Of Hydraulic Potentiality For The Generation Of Hydroelectric To Small Scale In The Basin Of The CHICAMOCHA River - Small Hydroelectric Centrals

    International Nuclear Information System (INIS)

    Pacheco P, Claudia M.; Parga C, Gloria M.

    1995-01-01

    In development of the agreement of technical and scientific cooperation established between the INEA and the Catholic University of Colombia, the program of Evaluation of Hydraulic Potentiality for Small Central was developed, whose purpose is to take the service to smaller population and villages of all the towns of the country. To begin the program the area corresponding to the basin of Chicamocha river was selected, since this region that corresponds to 72 towns of Boyaca and Santander, has good information, thanks to the diagnosis carried out by the Inderena with the purpose of formulating a Plan of Classification and Handling of the Basin. The work consisted on the identification of all the micro basins, the analysis of the demand of energy of the settled population, to evaluate the generating capacity of the flows of water and, according to the results, to propose alternatives for the design of small hydroelectric centrals (PCH) in accordance with the needs

  7. A methodology based on dynamic artificial neural network for short-term forecasting of the power output of a PV generator

    International Nuclear Information System (INIS)

    Almonacid, F.; Pérez-Higueras, P.J.; Fernández, Eduardo F.; Hontoria, L.

    2014-01-01

    Highlights: • The output of the majority of renewables energies depends on the variability of the weather conditions. • The short-term forecast is going to be essential for effectively integrating solar energy sources. • A new method based on artificial neural network to predict the power output of a PV generator one hour ahead is proposed. • This new method is based on dynamic artificial neural network to predict global solar irradiance and the air temperature. • The methodology developed can be used to estimate the power output of a PV generator with a satisfactory margin of error. - Abstract: One of the problems of some renewables energies is that the output of these kinds of systems is non-dispatchable depending on variability of weather conditions that cannot be predicted and controlled. From this point of view, the short-term forecast is going to be essential for effectively integrating solar energy sources, being a very useful tool for the reliability and stability of the grid ensuring that an adequate supply is present. In this paper a new methodology for forecasting the output of a PV generator one hour ahead based on dynamic artificial neural network is presented. The results of this study show that the proposed methodology could be used to forecast the power output of PV systems one hour ahead with an acceptable degree of accuracy

  8. Attracting finance for hydroelectric power

    International Nuclear Information System (INIS)

    Besant-Jones, John

    1996-01-01

    Hydroelectricity will continue to be important for meeting power requirements in developing countries. Much of the funding required for hydroelectric projects must come from non-government source; hydroelectric projects will therefore need to be attractive to private investors. This note explores the risks investors face, how this can be mitigated, and how the World Bank group can offer advice (as well as finance) to member countries to facilitate investment in hydro electric projects. 3 refs., 1 fig

  9. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    Energy Technology Data Exchange (ETDEWEB)

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  10. Hydroelectric power generation in an Alpine basin: future water-energy scenarios in a run-of-the-river plant

    Science.gov (United States)

    Bongio, Marco; Avanzi, Francesco; De Michele, Carlo

    2016-08-01

    We investigate scenarios of hydroelectric power generation for an Alpine run-of-the-river plant in 2050. To this end, we include a conversion from streamflow to energy in a hydrological model of the basin, and we introduce a set of benchmark climate scenarios to evaluate expected future production. These are a "future-like-present" scenario assuming future precipitation and temperature inputs to be statistically equivalent to those observed during the recent past at the same location, a "warmer-future" scenario, which considers an additional increase in temperature, and a "liquid-only" scenario where only liquid precipitation is admitted. In addition, two IPCC-like climatic scenarios (RCP 4.5 and RCP 8.5) are considered. Uncertainty in glaciers' volume is accounted by initializing the hydrological model with two different inventories of glaciers. Ensemble results reveal that 1) an average decrease between -40% and -19% of hydroelectric power generation in 2050 is predicted at the plant considered (with respect to present condition); 2) an average decrease between -20% and -38% of cumulative incoming streamflow volume at the plant is also predicted, again with respect to present condition; 3) these effects are associated with a strong average decrease of the volume of glaciers (between -76% and -96%, depending on the initial value considered). However, Monte Carlo simulations show that results are also prone to high uncertainties. Implications of these results for run-of-the-river plants are discussed.

  11. Feasibility study for Boardman River hydroelectric power. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-22

    The feasibility of generating additional hydroelectric power from five consecutive existing dams located on the Boardman River in Grand Traverse County and Traverse City, Michigan, was investigated. The potential hydropower production capabilities, in terms of base load power and peak load power, the legal-institutional-environmental constraints, and the economic feasibility, including capital investment, operating costs and maintenance costs, were evaluated for each of the five dam sites individually and as a series of co-dependent facilities. The impact of installing fish passages at each site was analyzed separately. The feasibility assessment utilized the present worth analytical method, considering revenue based on thirty mills/kWh for power, 0.4% general economy escalation rate, and a 6% net income to the municipal utility. The sensitivity of fuel costs increasing at a different rate than the general price-escalation was tested by allowing the increase in fuel costs to vary from 3 to 8% per year. Assuming fuel costs increase at the same rate as the general economy, it is feasible to update, retrofit, renovate, and install hydroelectric generating capacity at Sabin, Boardman and Brown Bridge. Rehabilitation of Union Street and Keystone is also feasible but somewhat less attractive. Operating the dams as a co-dependent system has environmental advantages and can provide additional revenue through peak load power rates. A development plan to implement the above is outlined utilizing an ownership arrangement whereby Grand Traverse County provides easements for Sabin and Boardman Dams. The plan calls for operation of the system by Traverse City.

  12. An Advanced Bayesian Method for Short-Term Probabilistic Forecasting of the Generation of Wind Power

    Directory of Open Access Journals (Sweden)

    Antonio Bracale

    2015-09-01

    Full Text Available Currently, among renewable distributed generation systems, wind generators are receiving a great deal of interest due to the great economic, technological, and environmental incentives they involve. However, the uncertainties due to the intermittent nature of wind energy make it difficult to operate electrical power systems optimally and make decisions that satisfy the needs of all the stakeholders of the electricity energy market. Thus, there is increasing interest determining how to forecast wind power production accurately. Most the methods that have been published in the relevant literature provided deterministic forecasts even though great interest has been focused recently on probabilistic forecast methods. In this paper, an advanced probabilistic method is proposed for short-term forecasting of wind power production. A mixture of two Weibull distributions was used as a probability function to model the uncertainties associated with wind speed. Then, a Bayesian inference approach with a particularly-effective, autoregressive, integrated, moving-average model was used to determine the parameters of the mixture Weibull distribution. Numerical applications also are presented to provide evidence of the forecasting performance of the Bayesian-based approach.

  13. Short-term energy outlook: Quarterly projections, Third quarter 1992

    International Nuclear Information System (INIS)

    1992-08-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The principal users of the Outlook are managers and energy analysts in private industry and government. The forecast period for this issue of the Outlook extends from the third quarter of 1992 through the fourth quarter of 1993. Values for the second quarter of 1992, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding

  14. Legal obstacles and incentives to the development of small scale hydroelectric power in Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are examined. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Additional sections cover acquisition; liability; Department for Natural Resources and Environmental Protection; energy utilities; local regulations; incidental impacts; financial considerations; and sources of information. In Kentucky, many of the impacts have not been implemented with regard to small-scale hydroelectric energy, since in Kentucky most electricity is coal-generated and any hydroelectric power that does exist, is derived from TVA or the Army Corp of Engineer projects.

  15. West Kootenay Power Ltd. : Application to sell its hydroelectric generation assets : Decision

    International Nuclear Information System (INIS)

    Ostergaard, P.; Bradley, P.G.; Clemenhagen, B.L.

    2001-01-01

    An investor-owned electric utility providing wholesale and retail service in the West Kootenay and South Okanagan regions of British Columbia, West Kootenay Power Ltd. (WKP) sought the approval from the British Columbia Utilities Commission to sell the four hydroelectric power plants and related facilities to Kootenay River Power Corporation (KRP), and for the purchase by WKP of the output of these plants under a 60-year power purchase agreement. The four hydroelectric plants have a combined rated capacity of approximately 214 MW. Most of the energy and capacity needs of WKP are met via power purchase contracts and agreements, as winter peak loads approach 700 MW. As a result of share purchases, KRP would be 50 per cent owned by each of a provincial Crown Corporation, Columbia Power Corporation (CPC) and a wholly-owned subsidiary of the Columbia Basin Trust (CBT), CBT Energy Inc., if the transactions are allowed to proceed. Three principal agreements are of interest: the Asset Transfer Agreement (ATA), the Share Purchase Agreement (SPA), and the Power Purchase Agreement (PPA). During the review process, two main issues warranted special consideration: the treatment of the proceeds of the sale of assets, and the statutory parameters used by the Commission for the adjudication of the Application. The Application was submitted March 22, 2001, and the public hearing process began May 29, 2001. This Application is unique, in that it contains three agreements that would each require a separate review, but WKP requested that the agreements be considered in their aggregate. The Commission complied, and decided to deny the Application. Unless the terms of the sale are restructured, the transfer of assets to Kootenay River Power Corporation will not be approved by the Commission. Within one month of the date of this decision, WKP is to notify the Commission of its intentions, since it had signified that it would not proceed with the sale unless WKP shareholder receives 100

  16. Hydroelectric power in Romania. Past - present - future

    International Nuclear Information System (INIS)

    Bogan, V.

    1996-01-01

    This paper presents an analysis of the past and present situation in hydroelectric power (achievements, rates of commissioning and so on) and the future strategies for the hydroelectric power resource development in the conditions of a free market economy. At present the contribution of hydroelectric power in the Romania's total power balance is about 16,500 GW h/year which represents nearly 28 %. The theoretical hydroelectric power potential of Romania is 75,000 GW h/year while the technical potential, which could actually be developed, is only 40,000 GW h/year. Finally, there are presented the main directions in the hydroelectric power development up to the year 2020. (author) 3 tabs

  17. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    Taddeucci, Joe [Dept. of Public Works, Boulder, CO (United States). Utilities Division

    2013-03-29

    double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative

  18. Proposed Dunvegan hydroelectric project

    International Nuclear Information System (INIS)

    Houston, M.

    2001-01-01

    A new hydroelectric project is being proposed on the Peace River in the vicinity of Dunvegan, Alberta, by Glacier Power. The proposal calls for a low head, run-of-the-river hydroelectric power plant which would comprise a powerhouse containing 40 Kaplan turbines, a weir section, two fishways and a boat lock. The capacity of the generating plant would be 80 MW. As per established guidelines, the review process was initiated in July 1999 and is ongoing. Stakeholders, government agencies, both at the federal and provincial levels, are involved in the review process. The potential effects on the ice regime, fish passage and fish mortality and bank stability are the issues that have warranted the most attention to date. Scheduled to begin on October 2, 2001, a public hearing on the project has been arranged by the Alberta Energy and Utilities Board. The objective sought by Glacier Power is to have the project certified as being a green-power plant. Green power is defined as power produced from renewable sources with low environmental impact. The production of power with minimal environmental impacts is being encouraged in Alberta by Glacier Power, which sells power for a premium. 6 refs., 4 figs

  19. What are the differences between long-term, short-term, and working memory?

    Science.gov (United States)

    Cowan, Nelson

    2008-01-01

    In the recent literature there has been considerable confusion about the three types of memory: long-term, short-term, and working memory. This chapter strives to reduce that confusion and makes up-to-date assessments of these types of memory. Long- and short-term memory could differ in two fundamental ways, with only short-term memory demonstrating (1) temporal decay and (2) chunk capacity limits. Both properties of short-term memory are still controversial but the current literature is rather encouraging regarding the existence of both decay and capacity limits. Working memory has been conceived and defined in three different, slightly discrepant ways: as short-term memory applied to cognitive tasks, as a multi-component system that holds and manipulates information in short-term memory, and as the use of attention to manage short-term memory. Regardless of the definition, there are some measures of memory in the short term that seem routine and do not correlate well with cognitive aptitudes and other measures (those usually identified with the term "working memory") that seem more attention demanding and do correlate well with these aptitudes. The evidence is evaluated and placed within a theoretical framework depicted in Fig. 1.

  20. Hydroelectric power stations and ecological energy policy

    International Nuclear Information System (INIS)

    Novakova, R.

    1993-01-01

    The report discusses the place of hydroenergy in solving the power and ecological problems of Bulgaria: level of building up of the hydroelectric capacity of the country; possibilities for new hydro electric construction; environmental problems of design, construction and operation of the hydroelectric units; advantages of the hydroelectric engineering. The possibilities of the hydroelectric power plants as an alternative of the other more or less conventional electicity producers are shown in order to help in decision making as regards the problems of the economic, power and environmental crisis. (author)

  1. Short-term energy outlook, July 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Energy Information Administration (EIA) prepares The Short-Term Energy Outlook (energy supply, demand, and price projections) monthly for distribution on the internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. In addition, printed versions of the report are available to subscribers in January, April, July and October. The forecast period for this issue of the Outlook extends from July 1998 through December 1999. Values for second quarter of 1998 data, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the July 1998 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. 28 figs., 19 tabs.

  2. From probabilistic forecasts to statistical scenarios of short-term wind power production

    DEFF Research Database (Denmark)

    Pinson, Pierre; Papaefthymiou, George; Klockl, Bernd

    2009-01-01

    on the development of the forecast uncertainty through forecast series. However, this additional information may be paramount for a large class of time-dependent and multistage decision-making problems, e.g. optimal operation of combined wind-storage systems or multiple-market trading with different gate closures......Short-term (up to 2-3 days ahead) probabilistic forecasts of wind power provide forecast users with highly valuable information on the uncertainty of expected wind generation. Whatever the type of these probabilistic forecasts, they are produced on a per horizon basis, and hence do not inform....... This issue is addressed here by describing a method that permits the generation of statistical scenarios of short-term wind generation that accounts for both the interdependence structure of prediction errors and the predictive distributions of wind power production. The method is based on the conversion...

  3. The Demonstration of Short-Term Consolidation.

    Science.gov (United States)

    Jolicoeur, Pierre; Dell'Acqua, Roberto

    1998-01-01

    Results of seven experiments involving 112 college students or staff using a dual-task approach provide evidence that encoding information into short-term memory involves a distinct process termed short-term consolidation (STC). Results suggest that STC has limited capacity and that it requires central processing mechanisms. (SLD)

  4. Quantifying and Reducing Uncertainty in Correlated Multi-Area Short-Term Load Forecasting

    Energy Technology Data Exchange (ETDEWEB)

    Sun, Yannan; Hou, Zhangshuan; Meng, Da; Samaan, Nader A.; Makarov, Yuri V.; Huang, Zhenyu

    2016-07-17

    In this study, we represent and reduce the uncertainties in short-term electric load forecasting by integrating time series analysis tools including ARIMA modeling, sequential Gaussian simulation, and principal component analysis. The approaches are mainly focusing on maintaining the inter-dependency between multiple geographically related areas. These approaches are applied onto cross-correlated load time series as well as their forecast errors. Multiple short-term prediction realizations are then generated from the reduced uncertainty ranges, which are useful for power system risk analyses.

  5. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  6. What are the differences between long-term, short-term, and working memory?

    OpenAIRE

    Cowan, Nelson

    2008-01-01

    In the recent literature there has been considerable confusion about the three types of memory: long-term, short-term, and working memory. This chapter strives to reduce that confusion and makes up-to-date assessments of these types of memory. Long- and short-term memory could differ in two fundamental ways, with only short-term memory demonstrating (1) temporal decay and (2) chunk capacity limits. Both properties of short-term memory are still controversial but the current literature is rath...

  7. Integration of Lithium-Ion Battery Storage Systems in Hydroelectric Plants for Supplying Primary Control Reserve

    Directory of Open Access Journals (Sweden)

    Fabio Bignucolo

    2017-01-01

    Full Text Available The ever-growing diffusion of renewables as electrical generation sources is forcing the electrical power system to face new and challenging regulation problems to preserve grid stability. Among these, the primary control reserve is reckoned to be one of the most important issues, since the introduction of generators based on renewable energies and interconnected through static converters, if relieved from the primary reserve contribution, reduces both the system inertia and the available power reserve in case of network events involving frequency perturbations. In this scenario, renewable plants such as hydroelectric run-of-river generators could be required to provide the primary control reserve ancillary service. In this paper, the integration between a multi-unit run-of-river power plant and a lithium-ion based battery storage system is investigated, suitably accounting for the ancillary service characteristics as required by present grid codes. The storage system is studied in terms of maximum economic profitability, taking into account its operating constraints. Dynamic simulations are carried out within the DIgSILENT PowerFactory 2016 software environment in order to analyse the plant response in case of network frequency contingencies, comparing the pure hydroelectric plant with the hybrid one, in which the primary reserve is partially or completely supplied by the storage system. Results confirm that the battery storage system response to frequency perturbations is clearly faster and more accurate during the transient phase compared to a traditional plant, since time delays due to hydraulic and mechanical regulations are overpassed. A case study, based on data from an existing hydropower plant and referring to the Italian context in terms of operational constraints and ancillary service remuneration, is presented.

  8. Temporal information processing in short- and long-term memory of patients with schizophrenia.

    Science.gov (United States)

    Landgraf, Steffen; Steingen, Joerg; Eppert, Yvonne; Niedermeyer, Ulrich; van der Meer, Elke; Krueger, Frank

    2011-01-01

    Cognitive deficits of patients with schizophrenia have been largely recognized as core symptoms of the disorder. One neglected factor that contributes to these deficits is the comprehension of time. In the present study, we assessed temporal information processing and manipulation from short- and long-term memory in 34 patients with chronic schizophrenia and 34 matched healthy controls. On the short-term memory temporal-order reconstruction task, an incidental or intentional learning strategy was deployed. Patients showed worse overall performance than healthy controls. The intentional learning strategy led to dissociable performance improvement in both groups. Whereas healthy controls improved on a performance measure (serial organization), patients improved on an error measure (inappropriate semantic clustering) when using the intentional instead of the incidental learning strategy. On the long-term memory script-generation task, routine and non-routine events of everyday activities (e.g., buying groceries) had to be generated in either chronological or inverted temporal order. Patients were slower than controls at generating events in the chronological routine condition only. They also committed more sequencing and boundary errors in the inverted conditions. The number of irrelevant events was higher in patients in the chronological, non-routine condition. These results suggest that patients with schizophrenia imprecisely access temporal information from short- and long-term memory. In short-term memory, processing of temporal information led to a reduction in errors rather than, as was the case in healthy controls, to an improvement in temporal-order recall. When accessing temporal information from long-term memory, patients were slower and committed more sequencing, boundary, and intrusion errors. Together, these results suggest that time information can be accessed and processed only imprecisely by patients who provide evidence for impaired time comprehension

  9. Short-term memory across eye blinks.

    Science.gov (United States)

    Irwin, David E

    2014-01-01

    The effect of eye blinks on short-term memory was examined in two experiments. On each trial, participants viewed an initial display of coloured, oriented lines, then after a retention interval they viewed a test display that was either identical or different by one feature. Participants kept their eyes open throughout the retention interval on some blocks of trials, whereas on others they made a single eye blink. Accuracy was measured as a function of the number of items in the display to determine the capacity of short-term memory on blink and no-blink trials. In separate blocks of trials participants were instructed to remember colour only, orientation only, or both colour and orientation. Eye blinks reduced short-term memory capacity by approximately 0.6-0.8 items for both feature and conjunction stimuli. A third, control, experiment showed that a button press during the retention interval had no effect on short-term memory capacity, indicating that the effect of an eye blink was not due to general motoric dual-task interference. Eye blinks might instead reduce short-term memory capacity by interfering with attention-based rehearsal processes.

  10. Making the connection: The B.C. Hydro electric system and how it is operated

    International Nuclear Information System (INIS)

    1993-01-01

    British Columbia Hydro supplies electric energy to 93% of the province's population through an integrated electric system. Of the electricity supplied, 95% is generated at 29 hydroelectric plants, with the remainder coming from thermal plants burning fossil fuels. BC Hydro's high voltage transmission and distribution network consists of 17,600 km of lines 60 kV and above and 51,400 km of lines below 60 kV. A description of system operations begins with the principles of hydroelectric generation, with a brief note on thermal generation for peaking or short-term energy production. Non-power operations measures designed to minimize environmental impacts and enhance social benefits are also outlined along with electricity trade with other provinces and the USA. Planning of long- and short-term system operations is also reviewed. An analysis of system components is presented for the Peace, Columbia, Lower Mainland/Coastal/Fraser, and Vancouver Island regions. Finally, information is given on the 29 hydroelectric and 3 thermal plants, including drainage basin, reservoir description and map, inflow, capacity, turbine type, storage, operating constraints, and average energy capability. 51 figs

  11. Short-term memory and dual task performance

    Science.gov (United States)

    Regan, J. E.

    1982-01-01

    Two hypotheses concerning the way in which short-term memory interacts with another task in a dual task situation are considered. It is noted that when two tasks are combined, the activity of controlling and organizing performance on both tasks simultaneously may compete with either task for a resource; this resource may be space in a central mechanism or general processing capacity or it may be some task-specific resource. If a special relationship exists between short-term memory and control, especially if there is an identity relationship between short-term and a central controlling mechanism, then short-term memory performance should show a decrement in a dual task situation. Even if short-term memory does not have any particular identity with a controlling mechanism, but both tasks draw on some common resource or resources, then a tradeoff between the two tasks in allocating resources is possible and could be reflected in performance. The persistent concurrence cost in memory performance in these experiments suggests that short-term memory may have a unique status in the information processing system.

  12. Small-scale hydroelectric power plant of Passo do Inferno automation system; Sistema de automatizacao da PCH Passo do Inferno

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Luiz C. Lisboa; Moralles, Reni; Quadros, Carlos A.D.; Martiny, Raul; Moehlecke, Juarez E.; Costa, Nelson D. da; Cesar, Rogerio L.; Santos, Sergio S.; Basei, Eleu Natal [Companhia Estadual de Energia Eletrica do Estado do Rio Grande do Sul, Porto Alegre, RS (Brazil)

    1993-12-31

    This work introduces the automation system brought into the 1,7 MVA small-scale hydroelectric power plant of Passo do Inferno, state of Rio Grande do Sul, Brazil. The following systems are presented: supervision, security and generation control, as well as the program and the controller. In this work, it is focused the generation control system, as a new outfitted system in small-scale hydroelectric power plants 3 figs.

  13. A Short-Term Outage Model of Wind Turbines with Doubly Fed Induction Generators Based on Supervisory Control and Data Acquisition Data

    Directory of Open Access Journals (Sweden)

    Peng Sun

    2016-10-01

    Full Text Available This paper presents a short-term wind turbine (WT outage model based on the data collected from a wind farm supervisory control and data acquisition (SCADA system. Neural networks (NNs are used to establish prediction models of the WT condition parameters that are dependent on environmental conditions such as ambient temperature and wind speed. The prediction error distributions are discussed and used to calculate probabilities of the operation of protection relays (POPRs that were caused by the threshold exceedance of the environmentally sensitive parameters. The POPRs for other condition parameters are based on the setting time of the operation of protection relays. The union probability method is used to integrate the probabilities of operation of each protection relay to predict the WT short term outage probability. The proposed method has been used for real 1.5 MW WTs with doubly fed induction generators (DFIGs. The results show that the proposed method is more effective in WT outage probability prediction than traditional methods.

  14. Defect production in simulated cascades: Cascade quenching and short-term annealing

    International Nuclear Information System (INIS)

    Heinisch, H.L.

    1983-01-01

    Defect production in displacement cascades in copper has been modeled using the MARLOWE code to generate cascades and the stochastic annealing code ALSOME to simulate cascade quenching and short-term annealing of isolated cascades. Quenching is accomplished by using exaggerated values for defect mobilities and for critical reaction distances in ALSOME for a very short time. The quenched cascades are then short-term annealed with normal parameter values. The quenching parameter values were empirically determined by comparison with results of resistivity measurements. Throughout the collisional, quenching and short-term annealing phases of cascade development, the high energy cascades continue to behave as a collection of independent lower energy lobes. For recoils above about 30 keV the total number of defects and the numbers of free defects scale with the damage energy. As the energy decreases from 30 keV, defect production varies with the changing nature of the cascade configuration, resulting in more defects per unit damage energy. The simulated annealing of a low fluence of interacting cascades revealed an interstitial shielding effect on depleted zones during Stage I recovery. (orig.)

  15. What do short-term and long-term relationships look like? Building the relationship coordination and strategic timing (ReCAST) model.

    Science.gov (United States)

    Eastwick, Paul W; Keneski, Elizabeth; Morgan, Taylor A; McDonald, Meagan A; Huang, Sabrina A

    2018-05-01

    Close relationships research has examined committed couples (e.g., dating relationships, marriages) using intensive methods that plot relationship development over time. But a substantial proportion of people's real-life sexual experiences take place (a) before committed relationships become "official" and (b) in short-term relationships; methods that document the time course of relationships have rarely been applied to these contexts. We adapted a classic relationship trajectory-plotting technique to generate the first empirical comparisons between the features of people's real-life short-term and long-term relationships across their entire timespan. Five studies compared long-term and short-term relationships in terms of the timing of relationship milestones (e.g., flirting, first sexual intercourse) and the occurrence/intensity of important relationship experiences (e.g., romantic interest, strong sexual desire, attachment). As romantic interest was rising and partners were becoming acquainted, long-term and short-term relationships were indistinguishable. Eventually, romantic interest in short-term relationships plateaued and declined while romantic interest in long-term relationships continued to rise, ultimately reaching a higher peak. As relationships progressed, participants evidenced more features characteristic of the attachment-behavioral system (e.g., attachment, caregiving) in long-term than short-term relationships but similar levels of other features (e.g., sexual desire, self-promotion, intrasexual competition). These data inform a new synthesis of close relationships and evolutionary psychological perspectives called the Relationship Coordination and Strategic Timing (ReCAST) model. ReCAST depicts short-term and long-term relationships as partially overlapping trajectories (rather than relationships initiated with distinct strategies) that differ in their progression along a normative relationship development sequence. (PsycINFO Database Record (c

  16. Comparative study of the hydrogen generation during short term station blackout (STSBO) in a BWR

    International Nuclear Information System (INIS)

    Polo-Labarrios, M.A.; Espinosa-Paredes, G.

    2015-01-01

    Highlights: • Comparative study of generation in a simulated STSBO severe accident. • MELCOR and SCDAP/RELAP5 codes were used to understanding the main phenomena. • Both codes present similar thermal-hydraulic behavior for pressure and boil off. • SCDAP/RELAP5 predicts 15.8% lower hydrogen production than MELCOR. - Abstract: The aim of this work is the comparative study of hydrogen generation and the associated parameters in a simulated severe accident of a short-term station blackout (STSBO) in a typical BWR-5 with Mark-II containment. MELCOR (v.1.8.6) and SCDAP/RELAP5 (Mod.3.4) codes were used to understand the main phenomena in the STSBO event through the results comparison obtained from simulations with these codes. Due that the simulation scope of SCDAP/RELAP5 is limited to failure of the vessel pressure boundary, the comparison was focused on in-vessel severe accident phenomena; with a special interest in the vessel pressure, boil of cooling, core temperature, and hydrogen generation. The results show that at the beginning of the scenario, both codes present similar thermal-hydraulic behavior for pressure and boil off of cooling, but during the relocation, the pressure and boil off, present differences in timing and order of magnitude. Both codes predict in similar time the beginning of melting material drop to the lower head. As far as the hydrogen production rate, SCDAP/RELAP5 predicts 15.8% lower production than MELCOR

  17. Accurate Short-Term Power Forecasting of Wind Turbines: The Case of Jeju Island’s Wind Farm

    OpenAIRE

    BeomJun Park; Jin Hur

    2017-01-01

    Short-term wind power forecasting is a technique which tells system operators how much wind power can be expected at a specific time. Due to the increasing penetration of wind generating resources into the power grids, short-term wind power forecasting is becoming an important issue for grid integration analysis. The high reliability of wind power forecasting can contribute to the successful integration of wind generating resources into the power grids. To guarantee the reliability of forecas...

  18. Least cost addition of power from hydroelectrical developments: Maximizing existing assets

    Energy Technology Data Exchange (ETDEWEB)

    Felix, Lafontant; Briand, Marie-Helene; Veilleux, Rheaume

    2010-09-15

    Hydroelectric developments built in the early 1900's are nearing their useful lifespan and require significant rehabilitation in order to meet modern safety and performance criteria. Also, global increasing energy costs represent a strong incentive for operators to find low-cost, environment-friendly solutions while increasing energy generation at existing facilities. Projects promoting innovative ways of recycling existing developments are great examples of sustainable development and represent win-win solutions for population and hydropower industry alike. The proposed presentation describes successful projects consisting in the rehabilitation or addition of power to existing hydroelectric. These recycling projects are very attractive from both economic and environmental.

  19. Greenhouse gas emissions from hydroelectric reservoirs

    International Nuclear Information System (INIS)

    Rosa, L.P.; Schaeffer, R.

    1994-01-01

    In a recent paper, Rudd et al. have suggested that, per unit of electrical energy produced, greenhouse-gas emissions from some hydroelectric reservoirs in northern Canada may be comparable to emissions from fossil-fuelled power plants. The purpose of this comment is to elaborate these issues further so as to understand the potential contribution of hydroelectric reservoirs to the greenhouse effect. More than focusing on the total budget of carbon emissions (be they in the form of CH 4 or be they in the form of CO 2 ), this requires an evaluation of the accumulated greenhouse effect of gas emissions from hydroelectric reservoirs and fossil-fuelled power plants. Two issues will be considered: (a) global warming potential (GWP) for CH 4 ; and (b) how greenhouse-gas emissions from hydroelectric power plants stand against emissions from fossil-fuelled power plants with respect to global warming

  20. A Bayesian Method for Short-Term Probabilistic Forecasting of Photovoltaic Generation in Smart Grid Operation and Control

    Directory of Open Access Journals (Sweden)

    Gabriella Ferruzzi

    2013-02-01

    Full Text Available A new short-term probabilistic forecasting method is proposed to predict the probability density function of the hourly active power generated by a photovoltaic system. Firstly, the probability density function of the hourly clearness index is forecasted making use of a Bayesian auto regressive time series model; the model takes into account the dependence of the solar radiation on some meteorological variables, such as the cloud cover and humidity. Then, a Monte Carlo simulation procedure is used to evaluate the predictive probability density function of the hourly active power by applying the photovoltaic system model to the random sampling of the clearness index distribution. A numerical application demonstrates the effectiveness and advantages of the proposed forecasting method.

  1. Short-term incentive schemes for hospital managers

    Directory of Open Access Journals (Sweden)

    Lucas Malambe

    2013-10-01

    Full Text Available Orientation: Short-term incentives, considered to be an extrinsic motivation, are commonly used to motivate performance. This study explored hospital managers’ perceptions of short term incentives in maximising performance and retention. Research purpose: The study explored the experiences, views and perceptions of private hospital managers in South Africa regarding the use of short-term incentives to maximise performance and retention, as well as the applicability of the findings to public hospitals. Motivation for the study: Whilst there is an established link between performance reward schemes and organisational performance, there is little understanding of the effects of short term incentives on the performance and retention of hospital managers within the South African context. Research design, approach, and method: The study used a qualitative research design: interviews were conducted with a purposive sample of 19 hospital managers, and a thematic content analysis was performed. Main findings: Short-term incentives may not be the primary motivator for hospital managers, but they do play a critical role in sustaining motivation. Participants indicated that these schemes could also be applicable to public hospitals. Practical/managerial implications: Hospital managers are inclined to be more motivated by intrinsic than extrinsic factors. However, hospital managers (as middle managers also seem to be motivated by short-term incentives. A combination of intrinsic and extrinsic motivators should thus be used to maximise performance and retention. Contribution/value-add: Whilst the study sought to explore hospital managers’ perceptions of short-term incentives, it also found that an adequate balance between internal and external motivators is key to implementing an effective short-term incentive scheme.

  2. Economic aspects of hydroelectric power scheme rehabilitation

    International Nuclear Information System (INIS)

    Dupuy, M.

    1991-01-01

    As part of the management of a utility, it is necessary to check, beyond the technical aspect, the economic suitability of deciding whether to perform the maintenance or rehabilitation of an installation. The decision criteria involved are to be found within the framework of the utility's management system itself. After having set out the decision-making process of hydroelectric power station maintenance or rehabilitation, the document goes on to give a description of the economic advantage of such an operation. The latter is determined after having properly defined the overall cost of maintenance or rehabilitation: direct expenses and induced costs, and expected savings: economic performance, short and medium-term reduction of expenses as a result of the profitability and productivity of the rehabilitation. The profitability is calculated as the ratio between the economic balance and the amount of the operation. Productivity means the improvement of the utility's management indicators. The random aspect of savings and a simple method making it possible to integrate them into a calculation is mentioned, as well as the classification and aggregation of various operations of a similar nature that have to come into the budget requirements of the utility. (Author)

  3. Short-Term Intercultural Psychotherapy: Ethnographic Inquiry

    Science.gov (United States)

    Seeley, Karen M.

    2004-01-01

    This article examines the challenges specific to short-term intercultural treatments and recently developed approaches to intercultural treatments based on notions of cultural knowledge and cultural competence. The article introduces alternative approaches to short-term intercultural treatments based on ethnographic inquiry adapted for clinical…

  4. Why do short term workers have high mortality?

    DEFF Research Database (Denmark)

    Kolstad, Henrik; Olsen, Jørn

    1999-01-01

    or violence, the rate ratios for short term employment were 2.30 (95% Cl 1.74-3.06) and 1.86 (95% Cl 1.35-2.56), respectively. An unhealthy lifestyle may also be a determinant of short term employment. While it is possible in principle to adjust for lifestyle factors if proper data are collected, the health......Increased mortality is often reported among workers in short term employment. This may indicate either a health-related selection process or the presence of different lifestyle or social conditions among short term workers. The authors studied these two aspects of short term employment among 16...

  5. CREB binding protein is required for both short-term and long-term memory formation.

    Science.gov (United States)

    Chen, Guiquan; Zou, Xiaoyan; Watanabe, Hirotaka; van Deursen, Jan M; Shen, Jie

    2010-09-29

    CREB binding protein (CBP) is a transcriptional coactivator with histone acetyltransferase activity. Our prior study suggested that CBP might be a key target of presenilins in the regulation of memory formation and neuronal survival. To elucidate the role of CBP in the adult brain, we generated conditional knock-out (cKO) mice in which CBP is completely inactivated in excitatory neurons of the postnatal forebrain. Histological analysis revealed normal neuronal morphology and absence of age-dependent neuronal degeneration in the CBP cKO cerebral cortex. CBP cKO mice exhibited robust impairment in the formation of spatial, associative, and object-recognition memory. In addition to impaired long-term memory, CBP cKO mice also displayed deficits in short-term associative and object-recognition memory. Administration of a histone deacetylase inhibitor, trichostatin A, rescued the reduction of acetylated histones in the CBP cKO cortex but failed to rescue either short- or long-term memory deficits, suggesting that the memory impairment may not be caused by general reduction of histone acetyltransferase activity in CBP cKO mice. Further microarray and Western analysis showed decreased expression of calcium-calmodulin-dependent kinase isoforms and NMDA and AMPA receptor subunits in the cerebral cortex of CBP cKO mice. Collectively, these findings suggest a crucial role for CBP in the formation of both short- and long-term memory.

  6. Systems for the calculation of electrical parameters and energy efficiency for high-capacity hydroelectric generators; Sistemas para el calculo de parametros electricos y eficiencia energetica para generadores hidroelectricos de gran capacidad

    Energy Technology Data Exchange (ETDEWEB)

    Reyes Martinez, Oscar Alfonso; Pascacio de los Santos, Alberth; Perez Abad, Carlos Alberto [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Leon Rivera, Nicolas [CFE-LAPEM, Irapuato, Guanajuato (Mexico)

    2012-07-01

    In recent years, the Comision Federal de Electricidad (CFE) has developed important hydroelectrical power projects in Mexico. Most of them are located in the Santiago River Hydrological System in Nayarit, Mexico. A total of 27 projects with a capacity of 4,300 MW are considered but only 32% of them have been carried out. One of the most ambitious projects that continue in process of construction is the Hydroelectrical Plant La Yesca. This project will conclude in late 2012 and consists of two electric generators of 375 MW, 17 kV. It will be second in power and the third in electrical generation at the system. According to national and international standards, a set of static and dynamic tests must be performed in these generators before commissioning, to ensure their proper operation. Winding stator high voltage endurance test, three phase sudden short circuit test and energy efficiency calculation are some of the most important tests to be performed in a new electrical generator. These tests are difficult to perform on-site due to the equipment capacity required, so very few companies in the world can conduct them. In Mexico no one has the necessary infrastructure for testing in high capacity hydroelectric generators such as those from La Yesca, so the Laboratorio de Pruebas a Equipos y Materiales (LAPEM) has invested in projects to improve this project in order to meet the needs of the Mexican electricity sector. This paper is a description of the systems developed for the calculation of electrical parameters and energy efficiency for this class of generators. [Spanish] En los ultimos anos, la Comision Federal de Electricidad (CFE) ha desarrollado importantes proyectos hidroelectricos en Mexico. La mayor parte se ubican en el Sistema Hidrologico del Rio Santiago en Nayarit, Mexico. Se consideran un total de 27 proyectos con capacidad de 4300 MW, pero solo 32 % de ellos se han llevado a cabo. Uno de los proyectos mas ambiciosos que continua en proceso de

  7. Performance assessment of deterministic and probabilistic weather predictions for the short-term optimization of a tropical hydropower reservoir

    Science.gov (United States)

    Mainardi Fan, Fernando; Schwanenberg, Dirk; Alvarado, Rodolfo; Assis dos Reis, Alberto; Naumann, Steffi; Collischonn, Walter

    2016-04-01

    Hydropower is the most important electricity source in Brazil. During recent years, it accounted for 60% to 70% of the total electric power supply. Marginal costs of hydropower are lower than for thermal power plants, therefore, there is a strong economic motivation to maximize its share. On the other hand, hydropower depends on the availability of water, which has a natural variability. Its extremes lead to the risks of power production deficits during droughts and safety issues in the reservoir and downstream river reaches during flood events. One building block of the proper management of hydropower assets is the short-term forecast of reservoir inflows as input for an online, event-based optimization of its release strategy. While deterministic forecasts and optimization schemes are the established techniques for the short-term reservoir management, the use of probabilistic ensemble forecasts and stochastic optimization techniques receives growing attention and a number of researches have shown its benefit. The present work shows one of the first hindcasting and closed-loop control experiments for a multi-purpose hydropower reservoir in a tropical region in Brazil. The case study is the hydropower project (HPP) Três Marias, located in southeast Brazil. The HPP reservoir is operated with two main objectives: (i) hydroelectricity generation and (ii) flood control at Pirapora City located 120 km downstream of the dam. In the experiments, precipitation forecasts based on observed data, deterministic and probabilistic forecasts with 50 ensemble members of the ECMWF are used as forcing of the MGB-IPH hydrological model to generate streamflow forecasts over a period of 2 years. The online optimization depends on a deterministic and multi-stage stochastic version of a model predictive control scheme. Results for the perfect forecasts show the potential benefit of the online optimization and indicate a desired forecast lead time of 30 days. In comparison, the use of

  8. The business for power : hydro-electricity in southeastern British Columbia 1897-1997

    International Nuclear Information System (INIS)

    Mouat, J.

    1997-01-01

    The evolution and development of the hydroelectric power industry in southeastern British Columbia was chronicled by recounting the first hundred years of the West Kootenay Power and Light Electrical Utility. The utility's first generator produced electricity in the summer of 1898 when hydro-electric companies were a new phenomenon. The factors behind the success of the company, the personalities of the promoters and entrepreneurs that launched the company, the complex interplay of unique events and the social and political context that illustrate a fascinating process in which electricity became an integral part of everyday life, are described. Refs., tabs., figs

  9. Hydroelectric dams in Amazon as source of GHG

    International Nuclear Information System (INIS)

    Rosa, L.P.; Schaeffer, R.; Santos, M.A.

    1996-01-01

    A recent paper by Fearnside points out that hydroelectric development in Amazonia is a significant source of greenhouse gases (GHG) emissions. This conclusion is in contrast to the common belief that hydroelectric dams are better than fossil fuel use in electric power generation, from the view point of GHG emissions. The authors have considered both CH 4 and CO 2 emissions taking into account the instantaneous radiative forcing due to a unit increase in the concentration of gases, the decay times of gases in the atmosphere and the emissions patterns of emissions vary depending on biomass density and type of the forest area flooded, as well as on depth of flooding. As the Fearnside paper is more concerned with CO 2 emissions from the above water biomass, the authors' focus will be restricted to the formulae for calculating the cumulative effect of CO 2

  10. Short-term energy outlook. Quarterly projections, first quarter 1995

    International Nuclear Information System (INIS)

    1995-02-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). The forecast period for this issue of the Outlook extends from the first quarter of 1995 through the fourth quarter of 1996. Values for the fourth quarter of 1994, however, are preliminary EIA estimates or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the first quarter 1995 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the Short-Term Integrated Forecasting System (STIFS). The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service

  11. Short-term mechanisms influencing volumetric brain dynamics

    Directory of Open Access Journals (Sweden)

    Nikki Dieleman

    2017-01-01

    Full Text Available With the use of magnetic resonance imaging (MRI and brain analysis tools, it has become possible to measure brain volume changes up to around 0.5%. Besides long-term brain changes caused by atrophy in aging or neurodegenerative disease, short-term mechanisms that influence brain volume may exist. When we focus on short-term changes of the brain, changes may be either physiological or pathological. As such determining the cause of volumetric dynamics of the brain is essential. Additionally for an accurate interpretation of longitudinal brain volume measures by means of neurodegeneration, knowledge about the short-term changes is needed. Therefore, in this review, we discuss the possible mechanisms influencing brain volumes on a short-term basis and set-out a framework of MRI techniques to be used for volumetric changes as well as the used analysis tools. 3D T1-weighted images are the images of choice when it comes to MRI of brain volume. These images are excellent to determine brain volume and can be used together with an analysis tool to determine the degree of volume change. Mechanisms that decrease global brain volume are: fluid restriction, evening MRI measurements, corticosteroids, antipsychotics and short-term effects of pathological processes like Alzheimer's disease, hypertension and Diabetes mellitus type II. Mechanisms increasing the brain volume include fluid intake, morning MRI measurements, surgical revascularization and probably medications like anti-inflammatory drugs and anti-hypertensive medication. Exercise was found to have no effect on brain volume on a short-term basis, which may imply that dehydration caused by exercise differs from dehydration by fluid restriction. In the upcoming years, attention should be directed towards studies investigating physiological short-term changes within the light of long-term pathological changes. Ultimately this may lead to a better understanding of the physiological short-term effects of

  12. Verbal Short-Term Memory Span in Speech-Disordered Children: Implications for Articulatory Coding in Short-Term Memory.

    Science.gov (United States)

    Raine, Adrian; And Others

    1991-01-01

    Children with speech disorders had lower short-term memory capacity and smaller word length effect than control children. Children with speech disorders also had reduced speech-motor activity during rehearsal. Results suggest that speech rate may be a causal determinant of verbal short-term memory capacity. (BC)

  13. Reliability of hydroelectric generation components, systems and units; Confiabilidad de componentes, sistemas y unidades de generacion hidroelectrica

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Sanchez, Ramon; Torres Toledano, Gerardo; Franco Nava, Jose Manuel [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1996-12-31

    This article presents a methodology for the calculation of the reliability of components, systems and hydroelectric generating units, as well as the scope of a computational system for the evaluation of such reliability. In the case of the reliability calculation of components and systems, the computer programs is not limited to hydro stations and can be used in other type of systems. [Espanol] En este articulo se presenta una metodologia para calcular la confiabilidad de componentes, sistemas y unidades de generacion hidroelectrica, asi como el alcance de un sistema computacional para evaluar dicha confiabilidad. En el caso del calculo de confiabilidad de componentes y sistemas, el programa de computo no se limita a centrales hidroelectricas y puede utilizarse en otro tipo de sistemas.

  14. Reliability of hydroelectric generation components, systems and units; Confiabilidad de componentes, sistemas y unidades de generacion hidroelectrica

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Sanchez, Ramon; Torres Toledano, Gerardo; Franco Nava, Jose Manuel [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    This article presents a methodology for the calculation of the reliability of components, systems and hydroelectric generating units, as well as the scope of a computational system for the evaluation of such reliability. In the case of the reliability calculation of components and systems, the computer programs is not limited to hydro stations and can be used in other type of systems. [Espanol] En este articulo se presenta una metodologia para calcular la confiabilidad de componentes, sistemas y unidades de generacion hidroelectrica, asi como el alcance de un sistema computacional para evaluar dicha confiabilidad. En el caso del calculo de confiabilidad de componentes y sistemas, el programa de computo no se limita a centrales hidroelectricas y puede utilizarse en otro tipo de sistemas.

  15. The Mind and Brain of Short-Term Memory

    OpenAIRE

    Jonides, John; Lewis, Richard L.; Nee, Derek Evan; Lustig, Cindy A.; Berman, Marc G.; Moore, Katherine Sledge

    2008-01-01

    The past 10 years have brought near-revolutionary changes in psychological theories about short-term memory, with similarly great advances in the neurosciences. Here, we critically examine the major psychological theories (the “mind”) of short-term memory and how they relate to evidence about underlying brain mechanisms. We focus on three features that must be addressed by any satisfactory theory of short-term memory. First, we examine the evidence for the architecture of short-term memory, w...

  16. Very-long-term and short-term chromatic adaptation: are their influences cumulative?

    Science.gov (United States)

    Belmore, Suzanne C; Shevell, Steven K

    2011-02-09

    Very-long-term (VLT) chromatic adaptation results from exposure to an altered chromatic environment for days or weeks. Color shifts from VLT adaptation are observed hours or days after leaving the altered environment. Short-term chromatic adaptation, on the other hand, results from exposure for a few minutes or less, with color shifts measured within seconds or a few minutes after the adapting light is extinguished; recovery to the pre-adapted state is complete in less than an hour. Here, both types of adaptation were combined. All adaptation was to reddish-appearing long-wavelength light. Shifts in unique yellow were measured following adaptation. Previous studies demonstrate shifts in unique yellow due to VLT chromatic adaptation, but shifts from short-term chromatic adaptation to comparable adapting light can be far greater than from VLT adaptation. The question considered here is whether the color shifts from VLT adaptation are cumulative with large shifts from short-term adaptation or, alternatively, does simultaneous short-term adaptation eliminate color shifts caused by VLT adaptation. The results show the color shifts from VLT and short-term adaptation together are cumulative, which indicates that both short-term and very-long-term chromatic adaptation affect color perception during natural viewing. Copyright © 2010 Elsevier Ltd. All rights reserved.

  17. The Amazon Hydroelectric Dams, an Internal Geopolitical Issue in Brazil

    International Nuclear Information System (INIS)

    Broggio, Celine; Droulers, Martine; Pallamar, Juan-Pablo

    2017-01-01

    This paper develops a geopolitical analysis of dams and hydroelectric plants in the Brazilian Amazon since the mid-2000's. The implementation of these projects has provoked tensions within the federal government under the presidency of the Workers' Party and accelerated the erosion of the ideological and political platform called 'socio-environmentalism', a situation that has led to the break-up of the coalition leading to the political crisis of 2016 and the impeachment of President Dilma Rousseff. From a regional point of view, the dispute occurred in very different terms in the case of the Madeira hydroelectric power stations (Santo Antonio and Jirau in Rondonia) and in the case of the Xingu dam (Belo Monte in Para), worldwide covered by the media

  18. The role of hydroelectric power in energy economy

    International Nuclear Information System (INIS)

    Allet, B.

    1989-01-01

    The state of development and the technical potential of hydroelectric power worldwide, in Europe and in Switzerland are briefly compared with each other. Afterwards, the most important types of hydroelectric power stations and their function in the electricity-distribution network, are put forward. The realistic possibilities of development in Switzerland, up to the year 2025, of each type of hydroelectric power station is judged with regard to the currently valid regulations. The effects of the peoples' initiative - 'towards the salvation of our waters' or for stricter regulations for the protection of water - on the chances of realisation of these possibilities of development are shown. The forseeable decrease in the production of energy by the existing hydroelectric power stations, as a result of the regulation planned for rest water, is judged. Various forecasts for the future quantity of hydroelectric power production in Switzerland are put forward. 6 figs., 7 tabs., 12 refs

  19. Standardizing the performance evaluation of short-term wind prediction models

    DEFF Research Database (Denmark)

    Madsen, Henrik; Pinson, Pierre; Kariniotakis, G.

    2005-01-01

    Short-term wind power prediction is a primary requirement for efficient large-scale integration of wind generation in power systems and electricity markets. The choice of an appropriate prediction model among the numerous available models is not trivial, and has to be based on an objective...... evaluation of model performance. This paper proposes a standardized protocol for the evaluation of short-term wind-poser preciction systems. A number of reference prediction models are also described, and their use for performance comparison is analysed. The use of the protocol is demonstrated using results...... from both on-shore and off-shore wind forms. The work was developed in the frame of the Anemos project (EU R&D project) where the protocol has been used to evaluate more than 10 prediction systems....

  20. Short term memory in echo state networks

    OpenAIRE

    Jaeger, H.

    2001-01-01

    The report investigates the short-term memory capacity of echo state recurrent neural networks. A quantitative measure MC of short-term memory capacity is introduced. The main result is that MC 5 N for networks with linear Output units and i.i.d. input, where N is network size. Conditions under which these maximal memory capacities are realized are described. Several theoretical and practical examples demonstrate how the short-term memory capacities of echo state networks can be exploited for...

  1. Lateral Vibration of Hydroelectric Generating Set with Different Supporting Condition of Thrust Pad

    Directory of Open Access Journals (Sweden)

    Xiaohui Si

    2011-01-01

    Full Text Available The variations of the supporting condition, which change the stiffness of tilting pad thrust bearing, may alter the dynamic behavior of the rotor system. The effects of supporting condition of thrust pad on the lateral vibration of a hydroelectric generating set are investigated in this paper. The action of a thrust bearing is described as moments acting on the thrust collar, and the tilting stiffness coefficients of thrust bearing are calculated. A model based on typical beam finite element method is established to calculate the dynamic response, and the effects of supporting conditions such as elastic oil tank support, different heights of the thrust pads with rigid support are discussed. The results reveal that the influence of thrust bearing is small when the elastic oil tanks work normally. When the supporting conditions turn to be rigid due to the oil leakage, the differences of thrust pad heights have evident influence on the load distribution of the thrust pads; while the effects on the tilting stiffness of the thrust bearing and the amplitude of the lateral shaft vibration is small when the maximum load on thrust pads is smaller than the allowable value.

  2. What share for hydroelectricity in France?

    International Nuclear Information System (INIS)

    Bongrand, Th.; Bouvier, E.; Francois, M.; Martin, J.M.; Tardieu, B.; Vogien, M.; Cruchon, Ph.; Miquel, J.; Gariel, A.; Levasseur, L.; Mallet, J.P.

    2004-01-01

    This document gathers 10 presentations (articles) given at the 2. meeting on hydroelectricity, held at Grenoble on May 2004. The papers present some examples of realizations in the domain of small-hydropower, the R and D in progress and some recent advances in hydraulic engineering, the safety and quality aspects, and the environmental impacts and sustainable development of hydroelectric power: 1 - examples of small hydropower plants in France and in progress at SOGREAH (T. Bongrand); 2 - the pico-power plants implemented on drinkable water networks (E. Bouvier); 3 - MINI-AQUA: the mini-hydro solution (M. Francois); 4 - Grenoble and the Alpine valley, pole of hydraulic and hydroelectric competences (J.M. Martin); 5 - history and R and D (B. Tardieu); 6 - advances in engineering for a forefront industry (M. Vogien); 7 - improvement of hydraulic safety (P. Cruchon); 8 - a ISO 14001 certification experience in the domain of hydroelectricity (A. Gariel); 9 - the Rhone river development, reserved flow rate and sustainable development (L. Levasseur); 10 - small hydropower: impact and integration (J.P. Mallet). (J.S.)

  3. Stochastic short-term maintenance scheduling of GENCOs in an oligopolistic electricity market

    International Nuclear Information System (INIS)

    Fotouhi Ghazvini, Mohammad Ali; Canizes, Bruno; Vale, Zita; Morais, Hugo

    2013-01-01

    Highlights: ► Decision making under uncertainty. ► Stochastic Mixed Integer Quadratic Programming applied to short-term maintenance scheduling. ► Outage scheduling in Oligopolistic electricity markets. ► Generation companies maintenance scheduling. -- Abstract: In the proposed model, the independent system operator (ISO) provides the opportunity for maintenance outage rescheduling of generating units before each short-term (ST) time interval. Long-term (LT) scheduling for 1 or 2 years in advance is essential for the ISO and the generation companies (GENCOs) to decide their LT strategies; however, it is not possible to be exactly followed and requires slight adjustments. The Cournot-Nash equilibrium is used to characterize the decision-making procedure of an individual GENCO for ST intervals considering the effective coordination with LT plans. Random inputs, such as parameters of the demand function of loads, hourly demand during the following ST time interval and the expected generation pattern of the rivals, are included as scenarios in the stochastic mixed integer program defined to model the payoff-maximizing objective of a GENCO. Scenario reduction algorithms are used to deal with the computational burden. Two reliability test systems were chosen to illustrate the effectiveness of the proposed model for the ST decision-making process for future planned outages from the point of view of a GENCO.

  4. Improvements for conventional clean energies: hydroelectric power

    International Nuclear Information System (INIS)

    Henry, P.

    1991-01-01

    Hydro-electric energy offers considerable possibilities and advantages which should be exploited before considering the construction of power which use fossil fuels. In fact: - hydro-electric is the only renewable energy available in very large quantities at competitive prices, - there are still many possibilities for producing it since at present only 14% is exploited, - hydraulic machines have been considerably improved over recent years, - the improvements make it possible to use watercourses in successive stages thus considerably reducing damage to the environment, - hydro-electric installations have a regulating effect, - vast areas of uncultivated land can be irrigated using the water reserves created by the artificial lakes. All these reasons favour intensive exploitation of hydro-electric energy reserves, in spite of the initial investment costs, which are sometimes higher than those for constructing fuel/driven power stations. (author) 9 figs., 1 tab., 3 refs

  5. The little hydro-electricity: the boosting?

    International Nuclear Information System (INIS)

    Brunier, S.; Najac, C.; Roussel, A.M.; Claustre, R; Baril, D.; Marty, D.; Lefevre, P.; Arnould, M.

    2007-01-01

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  6. Short term and medium term power distribution load forecasting by neural networks

    International Nuclear Information System (INIS)

    Yalcinoz, T.; Eminoglu, U.

    2005-01-01

    Load forecasting is an important subject for power distribution systems and has been studied from different points of view. In general, load forecasts should be performed over a broad spectrum of time intervals, which could be classified into short term, medium term and long term forecasts. Several research groups have proposed various techniques for either short term load forecasting or medium term load forecasting or long term load forecasting. This paper presents a neural network (NN) model for short term peak load forecasting, short term total load forecasting and medium term monthly load forecasting in power distribution systems. The NN is used to learn the relationships among past, current and future temperatures and loads. The neural network was trained to recognize the peak load of the day, total load of the day and monthly electricity consumption. The suitability of the proposed approach is illustrated through an application to real load shapes from the Turkish Electricity Distribution Corporation (TEDAS) in Nigde. The data represents the daily and monthly electricity consumption in Nigde, Turkey

  7. Hydroelectric power utilization of the River Crna Reka

    International Nuclear Information System (INIS)

    Ivanova-Davidovikj, Jasna

    2001-01-01

    In the paper several feasibility studies for rational use of the Macedonian River Crna Reka, developed by foreign companies are analysed. The utilization of the hydro-power potential of the River Crna Reka is predicted to be by realization of two hydroelectric power plants with total capacity of 450 MW, as well as annual electric power generation of 600 GWh. This two HPPs will facilitate the development of the Macedonian electric power system

  8. European Short-term Electricity Market Designs under High Penetration of Wind Power

    NARCIS (Netherlands)

    Chaves Avila, J.P.

    2014-01-01

    The EU has ambitious policies for decarbonization of the electricity sector. Due to recent technological developments, wind power already represents a significant share of the generation mix in some European countries. As a result, short-term electricity markets and balancing arrangements must be

  9. Familiarity speeds up visual short-term memory consolidation.

    Science.gov (United States)

    Xie, Weizhen; Zhang, Weiwei

    2017-06-01

    Existing long-term memory (LTM) can boost the number of retained representations over a short delay in visual short-term memory (VSTM). However, it is unclear whether and how prior LTM affects the initial process of transforming fragile sensory inputs into durable VSTM representations (i.e., VSTM consolidation). The consolidation speed hypothesis predicts faster consolidation for familiar relative to unfamiliar stimuli. Alternatively, the perceptual boost hypothesis predicts that the advantage in perceptual processing of familiar stimuli should add a constant boost for familiar stimuli during VSTM consolidation. To test these competing hypotheses, the present study examined how the large variance in participants' prior multimedia experience with Pokémon affected VSTM for Pokémon. In Experiment 1, the amount of time allowed for VSTM consolidation was manipulated by presenting consolidation masks at different intervals after the onset of to-be-remembered Pokémon characters. First-generation Pokémon characters that participants were more familiar with were consolidated faster into VSTM as compared with recent-generation Pokémon characters that participants were less familiar with. These effects were absent in participants who were unfamiliar with both generations of Pokémon. Although familiarity also increased the number of retained Pokémon characters when consolidation was uninterrupted but still incomplete due to insufficient encoding time in Experiment 1, this capacity effect was absent in Experiment 2 when consolidation was allowed to complete with sufficient encoding time. Together, these results support the consolidation speed hypothesis over the perceptual boost hypothesis and highlight the importance of assessing experimental effects on both processing and representation aspects of VSTM. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  10. Short pulse neutron generator

    Science.gov (United States)

    Elizondo-Decanini, Juan M.

    2016-08-02

    Short pulse neutron generators are described herein. In a general embodiment, the short pulse neutron generator includes a Blumlein structure. The Blumlein structure includes a first conductive plate, a second conductive plate, a third conductive plate, at least one of an inductor or a resistor, a switch, and a dielectric material. The first conductive plate is positioned relative to the second conductive plate such that a gap separates these plates. A vacuum chamber is positioned in the gap, and an ion source is positioned to emit ions in the vacuum chamber. The third conductive plate is electrically grounded, and the switch is operable to electrically connect and disconnect the second conductive plate and the third conductive plate. The at least one of the resistor or the inductor is coupled to the first conductive plate and the second conductive plate.

  11. Mission: Partnerships - A Socially Responsible Approach for New Hydro-electric Developments

    Energy Technology Data Exchange (ETDEWEB)

    Wojczynski, Ed; Cole, Victoria; Pachal, Shawna; Goulet, Richard

    2010-09-15

    Worldwide there is a desire for clean, secure and renewable energy developed in an environmentally and socially responsible manner. In the Canadian province of Manitoba, where water is an abundant resource, efforts are being undertaken by Manitoba Hydro to achieve this goal through the development of new hydro-electric generating stations in partnership with Aboriginal (indigenous) communities. This paper focuses on the lessons learned by Manitoba Hydro in developing and implementing partnership agreements with northern Aboriginal communities on two new generation projects - the Wuskwatim Generation Project and the Keeyask Generation Project.

  12. Public choice in water resource management: two case studies of the small-scale hydroelectric controversy

    Energy Technology Data Exchange (ETDEWEB)

    Soden, D.L.

    1985-01-01

    Hydroelectric issues have a long history in the Pacific Northwest, and more recently have come to focus on developing environmentally less-obtrusive means of hydroelectric generation. Small-scale hydroelectric represents perhaps the most important of these means of developing new sources of renewable resources to lessen the nation's dependence on foreign sources of energy. Each potential small-scale hydroelectric project, however, manifests a unique history which provides a highly useful opportunity to study the process of collective social choice in the area of new energy uses of water resources. Utilizing the basic concepts of public choice theory, a highly developed and increasingly widely accepted approach in the social sciences, the politicalization of small-scale hydroelectric proposals is analyzed. Through the use of secondary analysis of archival public opinion data collected from residents of the State of Idaho, and through the development of the two case studies - one on the Palouse River in Eastern Washington and the other at Elk Creek Falls in Northern Idaho, the policy relevant behavior and influence of major actors is assessed. Results provide a useful test of the utility of public-choice theory for the study of cases of natural-resources development when public involvement is high.

  13. Short-Term Memory and Aphasia: From Theory to Treatment.

    Science.gov (United States)

    Minkina, Irene; Rosenberg, Samantha; Kalinyak-Fliszar, Michelene; Martin, Nadine

    2017-02-01

    This article reviews existing research on the interactions between verbal short-term memory and language processing impairments in aphasia. Theoretical models of short-term memory are reviewed, starting with a model assuming a separation between short-term memory and language, and progressing to models that view verbal short-term memory as a cognitive requirement of language processing. The review highlights a verbal short-term memory model derived from an interactive activation model of word retrieval. This model holds that verbal short-term memory encompasses the temporary activation of linguistic knowledge (e.g., semantic, lexical, and phonological features) during language production and comprehension tasks. Empirical evidence supporting this model, which views short-term memory in the context of the processes it subserves, is outlined. Studies that use a classic measure of verbal short-term memory (i.e., number of words/digits correctly recalled in immediate serial recall) as well as those that use more intricate measures (e.g., serial position effects in immediate serial recall) are discussed. Treatment research that uses verbal short-term memory tasks in an attempt to improve language processing is then summarized, with a particular focus on word retrieval. A discussion of the limitations of current research and possible future directions concludes the review. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  14. The hydroelectric power market in the world

    International Nuclear Information System (INIS)

    Junius, A.

    2004-10-01

    This work makes a synthesis of the hydroelectric power market, of its present day capacity in the world, and of its perspectives of development in the future. The first part treats of the hydroelectric facilities and of the market of hydroelectric power plants. It presents the technology used and the different types of plants, the evolution of their geographical setting and the future potentialities of development. The second part deals with the competitiveness of this industry with respect to: the energy policy stakes, the profitability, the energy independence of countries, the regulation of power networks and the environmental impacts. (J.S.)

  15. Incorporating Daily Flood Control Objectives Into a Monthly Stochastic Dynamic Programing Model for a Hydroelectric Complex

    Science.gov (United States)

    Druce, Donald J.

    1990-01-01

    A monthly stochastic dynamic programing model was recently developed and implemented at British Columbia (B.C.) Hydro to provide decision support for short-term energy exports and, if necessary, for flood control on the Peace River in northern British Columbia. The model establishes the marginal cost of supplying energy from the B.C. Hydro system, as well as a monthly operating policy for the G.M. Shrum and Peace Canyon hydroelectric plants and the Williston Lake storage reservoir. A simulation model capable of following the operating policy then determines the probability of refilling Williston Lake and possible spill rates and volumes. Reservoir inflows are input to both models in daily and monthly formats. The results indicate that flood control can be accommodated without sacrificing significant export revenue.

  16. Incorporating daily flood control objectives into a monthly stochastic dynamic programming model for a hydroelectric complex

    Energy Technology Data Exchange (ETDEWEB)

    Druce, D.J. (British Columbia Hydro and Power Authority, Vancouver, British Columbia (Canada))

    1990-01-01

    A monthly stochastic dynamic programing model was recently developed and implemented at British Columbia (B.C.) Hydro to provide decision support for short-term energy exports and, if necessary, for flood control on the Peace River in northern British Columbia. The model established the marginal cost of supplying energy from the B.C. Hydro system, as well as a monthly operating policy for the G.M. Shrum and Peace Canyon hydroelectric plants and the Williston Lake storage reservoir. A simulation model capable of following the operating policy then determines the probability of refilling Williston Lake and possible spill rates and volumes. Reservoir inflows are input to both models in daily and monthly formats. The results indicate that flood control can be accommodated without sacrificing significant export revenue.

  17. Short-term memories with a stochastic perturbation

    International Nuclear Information System (INIS)

    Pontes, Jose C.A. de; Batista, Antonio M.; Viana, Ricardo L.; Lopes, Sergio R.

    2005-01-01

    We investigate short-term memories in linear and weakly nonlinear coupled map lattices with a periodic external input. We use locally coupled maps to present numerical results about short-term memory formation adding a stochastic perturbation in the maps and in the external input

  18. Short-term energy outlook, January 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-01-01

    The Energy Information Administration (EIA) prepares the Short-Term Energy Outlook (energy supply, demand, and price projections) monthly. The forecast period for this issue of the Outlook extends from January 1999 through December 2000. Data values for the fourth quarter 1998, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the January 1999 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 28 figs., 19 tabs.

  19. Short-term memory

    Science.gov (United States)

    Toulouse, G.

    This is a rather bold attempt to bridge the gap between neuron structure and psychological data. We try to answer the question: Is there a relation between the neuronal connectivity in the human cortex (around 5,000) and the short-term memory capacity (7±2)? Our starting point is the Hopfield model (Hopfield 1982), presented in this volume by D.J. Amit.

  20. Hydroelectric resources. Inventory of the hydroelectric resources of the Atlantic Coast

    International Nuclear Information System (INIS)

    Arrieta, R.M.; Insignares R, G.

    1987-01-01

    Basically this report gives a clear vision of the possibilities of energy development in the Colombian Atlantic Coast, projects that contemplate a wide range as soon as it refers that is to say to generation ranges, they have been identified at level macro in the Sierra Nevada region and the Peasant with a profitable hydroelectric potential of 631 MW; in the Sinu region, 3 projects were identified with a profitable potential of 1186 MW and in the Magdalena region, was also identified 3 projects whose profitable potential is of 475 MW. At level micro, the carried out studies defined in the same previous regions a series of projects that they necessarily reach the megawatt. The report contains a description of each one of the identified projects and its current situation. It also presents a review of the makers of turbines that exist at the moment in the country

  1. Competitive short-term and long-term memory processes in spatial habituation.

    Science.gov (United States)

    Sanderson, David J; Bannerman, David M

    2011-04-01

    Exposure to a spatial location leads to habituation of exploration such that, in a novelty preference test, rodents subsequently prefer exploring a novel location to the familiar location. According to Wagner's (1981) theory of memory, short-term and long-term habituation are caused by separate and sometimes opponent processes. In the present study, this dual-process account of memory was tested. Mice received a series of exposure training trials to a location before receiving a novelty preference test. The novelty preference was greater when tested after a short, rather than a long, interval. In contrast, the novelty preference was weaker when exposure training trials were separated by a short, rather than a long interval. Furthermore, it was found that long-term habituation was determined by the independent effects of the amount of exposure training and the number of exposure training trials when factors such as the intertrial interval and the cumulative intertrial interval were controlled. A final experiment demonstrated that a long-term reduction of exploration could be caused by a negative priming effect due to associations formed during exploration. These results provide evidence against a single-process account of habituation and suggest that spatial habituation is determined by both short-term, recency-based memory and long-term, incrementally strengthened memory.

  2. Retrieval-Induced Inhibition in Short-Term Memory.

    Science.gov (United States)

    Kang, Min-Suk; Choi, Joongrul

    2015-07-01

    We used a visual illusion called motion repulsion as a model system for investigating competition between two mental representations. Subjects were asked to remember two random-dot-motion displays presented in sequence and then to report the motion directions for each. Remembered motion directions were shifted away from the actual motion directions, an effect similar to the motion repulsion observed during perception. More important, the item retrieved second showed greater repulsion than the item retrieved first. This suggests that earlier retrieval exerted greater inhibition on the other item being held in short-term memory. This retrieval-induced motion repulsion could be explained neither by reduced cognitive resources for maintaining short-term memory nor by continued inhibition between short-term memory representations. These results indicate that retrieval of memory representations inhibits other representations in short-term memory. We discuss mechanisms of retrieval-induced inhibition and their implications for the structure of memory. © The Author(s) 2015.

  3. Evaluation of Short Term Memory Span Function In Children

    Directory of Open Access Journals (Sweden)

    Barış ERGÜL

    2016-12-01

    Full Text Available Although details of the information encoded in the short-term memory where it is stored temporarily be recorded in the working memory in the next stage. Repeating the information mentally makes it remain in memory for a long time. Studies investigating the relationship between short-term memory and reading skills that are carried out to examine the relationship between short-term memory processes and reading comprehension. In this study information coming to short-term memory and the factors affecting operation of short term memory are investigated with regression model. The aim of the research is to examine the factors (age, IQ and reading skills that are expected the have an effect on short-term memory in children through regression analysis. One of the assumptions of regression analysis is to examine which has constant variance and normal distribution of the error term. In this study, because the error term is not normally distributed, robust regression techniques were applied. Also, for each technique; coefficient of determination is determined. According to the findings, the increase in age, IQ and reading skills caused the increase in short term memory in children. After applying robust regression techniques, the Winsorized Least Squares (WLS technique gives the highest coefficient of determination.

  4. Evaluation of Short Term Memory Span Function In Children

    OpenAIRE

    Barış ERGÜL; Arzu ALTIN YAVUZ; Ebru GÜNDOĞAN AŞIK

    2016-01-01

    Although details of the information encoded in the short-term memory where it is stored temporarily be recorded in the working memory in the next stage. Repeating the information mentally makes it remain in memory for a long time. Studies investigating the relationship between short-term memory and reading skills that are carried out to examine the relationship between short-term memory processes and reading comprehension. In this study information coming to short-term memory and the factors ...

  5. Short-term Memory as a Processing Shift

    Science.gov (United States)

    Lewis-Smith, Marion Quinn

    1975-01-01

    The series of experiments described here examined the predictions for free recall from sequential models and the shift formulation, focusing on the roles of short- and long-term memory in the primacy/recency shift and on the effects of expectancies on short- and long-term memory. (Author/RK)

  6. Estimation of free-flowingmicro hydroelectric power stations in Krasnoyarsk region

    OpenAIRE

    Kachina, E.; Botcharova, E.

    2010-01-01

    The external factors defining expediency of using micro hydroelectric power stations are considered. Exploration of areas of Krasnoyarsk region, which are suitable for usage of micro hydroelectric power stations is carried out. The market of primary real small hydroelectric engineering in Krasnoyarsk region is defined.

  7. Long-term effects of interference on short-term memory performance in the rat.

    Science.gov (United States)

    Missaire, Mégane; Fraize, Nicolas; Joseph, Mickaël Antoine; Hamieh, Al Mahdy; Parmentier, Régis; Marighetto, Aline; Salin, Paul Antoine; Malleret, Gaël

    2017-01-01

    A distinction has always been made between long-term and short-term memory (also now called working memory, WM). The obvious difference between these two kinds of memory concerns the duration of information storage: information is supposedly transiently stored in WM while it is considered durably consolidated into long-term memory. It is well acknowledged that the content of WM is erased and reset after a short time, to prevent irrelevant information from proactively interfering with newly stored information. In the present study, we used typical WM radial maze tasks to question the brief lifespan of spatial WM content in rodents. Groups of rats were submitted to one of two different WM tasks in a radial maze: a WM task involving the repetitive presentation of a same pair of arms expected to induce a high level of proactive interference (PI) (HIWM task), or a task using a different pair in each trial expected to induce a low level of PI (LIWM task). Performance was effectively lower in the HIWM group than in LIWM in the final trial of each training session, indicative of a "within-session/short-term" PI effect. However, we also observed a different "between-session/long-term" PI effect between the two groups: while performance of LIWM trained rats remained stable over days, the performance of HIWM rats dropped after 10 days of training, and this impairment was visible from the very first trial of the day, hence not attributable to within-session PI. We also showed that a 24 hour-gap across training sessions known to allow consolidation processes to unfold, was a necessary and sufficient condition for the long-term PI effect to occur. These findings suggest that in the HIWM task, WM content was not entirely reset between training sessions and that, in specific conditions, WM content can outlast its purpose by being stored more permanently, generating a long-term deleterious effect of PI. The alternative explanation is that WM content could be transferred and stored

  8. Long-term effects of interference on short-term memory performance in the rat.

    Directory of Open Access Journals (Sweden)

    Mégane Missaire

    Full Text Available A distinction has always been made between long-term and short-term memory (also now called working memory, WM. The obvious difference between these two kinds of memory concerns the duration of information storage: information is supposedly transiently stored in WM while it is considered durably consolidated into long-term memory. It is well acknowledged that the content of WM is erased and reset after a short time, to prevent irrelevant information from proactively interfering with newly stored information. In the present study, we used typical WM radial maze tasks to question the brief lifespan of spatial WM content in rodents. Groups of rats were submitted to one of two different WM tasks in a radial maze: a WM task involving the repetitive presentation of a same pair of arms expected to induce a high level of proactive interference (PI (HIWM task, or a task using a different pair in each trial expected to induce a low level of PI (LIWM task. Performance was effectively lower in the HIWM group than in LIWM in the final trial of each training session, indicative of a "within-session/short-term" PI effect. However, we also observed a different "between-session/long-term" PI effect between the two groups: while performance of LIWM trained rats remained stable over days, the performance of HIWM rats dropped after 10 days of training, and this impairment was visible from the very first trial of the day, hence not attributable to within-session PI. We also showed that a 24 hour-gap across training sessions known to allow consolidation processes to unfold, was a necessary and sufficient condition for the long-term PI effect to occur. These findings suggest that in the HIWM task, WM content was not entirely reset between training sessions and that, in specific conditions, WM content can outlast its purpose by being stored more permanently, generating a long-term deleterious effect of PI. The alternative explanation is that WM content could be

  9. On the relationship between short- and long-term memory

    DEFF Research Database (Denmark)

    Sørensen, Thomas Alrik

    James (1890) divided memory into separate stores; primary and secondary – or short-term and long-term memory. The interaction between the two stores often assumes that information initially is represented in volatile short-term store before entering and consolidating in the more durable long-term......, accepted). Counter to popular beliefs this suggest that long-term memory precedes short-term memory and not vice versa....... memory system (e.g. Atkinson & Shiffrin, 1968). Short-term memory seems to provide a surprising processing bottleneck where only a very limited amount of information can be represented at any given moment (Miller, 1956; Cowan, 2001). A number of studies have investigated the nature of this processing...

  10. Short-Term Wind Speed Forecasting Using Decomposition-Based Neural Networks Combining Abnormal Detection Method

    Directory of Open Access Journals (Sweden)

    Xuejun Chen

    2014-01-01

    Full Text Available As one of the most promising renewable resources in electricity generation, wind energy is acknowledged for its significant environmental contributions and economic competitiveness. Because wind fluctuates with strong variation, it is quite difficult to describe the characteristics of wind or to estimate the power output that will be injected into the grid. In particular, short-term wind speed forecasting, an essential support for the regulatory actions and short-term load dispatching planning during the operation of wind farms, is currently regarded as one of the most difficult problems to be solved. This paper contributes to short-term wind speed forecasting by developing two three-stage hybrid approaches; both are combinations of the five-three-Hanning (53H weighted average smoothing method, ensemble empirical mode decomposition (EEMD algorithm, and nonlinear autoregressive (NAR neural networks. The chosen datasets are ten-minute wind speed observations, including twelve samples, and our simulation indicates that the proposed methods perform much better than the traditional ones when addressing short-term wind speed forecasting problems.

  11. Short-term energy outlook: Quarterly projections, fourth quarter 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-14

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for printed publication in January, April, July, and October in the Short-Term Energy Outlook. The details of these projections, as well as monthly updates on or about the 6th of each interim month, are available on the internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The forecast period for this issue of the Outlook extends from the fourth quarter of 1997 through the fourth quarter of 1998. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the fourth quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. 19 tabs.

  12. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Hydroelectric power... BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Hydroelectric Power Water Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners of...

  13. Short-term memory and long-term memory are still different.

    Science.gov (United States)

    Norris, Dennis

    2017-09-01

    A commonly expressed view is that short-term memory (STM) is nothing more than activated long-term memory. If true, this would overturn a central tenet of cognitive psychology-the idea that there are functionally and neurobiologically distinct short- and long-term stores. Here I present an updated case for a separation between short- and long-term stores, focusing on the computational demands placed on any STM system. STM must support memory for previously unencountered information, the storage of multiple tokens of the same type, and variable binding. None of these can be achieved simply by activating long-term memory. For example, even a simple sequence of digits such as "1, 3, 1" where there are 2 tokens of the digit "1" cannot be stored in the correct order simply by activating the representations of the digits "1" and "3" in LTM. I also review recent neuroimaging data that has been presented as evidence that STM is activated LTM and show that these data are exactly what one would expect to see based on a conventional 2-store view. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  14. Fast Weight Long Short-Term Memory

    OpenAIRE

    Keller, T. Anderson; Sridhar, Sharath Nittur; Wang, Xin

    2018-01-01

    Associative memory using fast weights is a short-term memory mechanism that substantially improves the memory capacity and time scale of recurrent neural networks (RNNs). As recent studies introduced fast weights only to regular RNNs, it is unknown whether fast weight memory is beneficial to gated RNNs. In this work, we report a significant synergy between long short-term memory (LSTM) networks and fast weight associative memories. We show that this combination, in learning associative retrie...

  15. Investigation of short and long term trends in chemical composition of Eastern Mediterranean aerosols

    International Nuclear Information System (INIS)

    2011-01-01

    A collaborative study was started with the Middle East Technical University, Environmental Engineering Department in 2004 in order to determine the transport of air pollutants and their deposition rates to Eastern Mediterranean with the ultimate aim of filling the gaps in knowledge on the current status of Eastern Mediterranean air quality profile. Collection sufficient amount of representative samples, analyzes of the collected samples with high accuracy and precision and interpretation of generated data are crucial efforts. To attain this goal, EDXRF spectrometer, which is a rapid, reliable and sensitive analytical instrument, located at our center was employed in analysis of the collected samples after calibration with 'NIST 2783 Air Particles on Filter'. The effectiveness of the control strategies taken on the emissions was discussed by investigating the short and long term variations in the chemical composition of samples collected between 1993 and 2001 at Antalya station. In this context, generated data set was studied for short (daily) term, seasonal and long term variations. It has been found that short term variations in the concentrations of pollutants in short time scale are highly episodic. The concentration of measured pollutants was changed 10-20 folds in the subsequent two days. The most important factors affecting the chemical composition of pollutants in short time interval are meteorological factors such as precipitation and variations observed at the emission strength of pollutants. The declined in Pb concentrations at the Antalya station was attributed to observed decrease in Pb emissions in Europe after the introduction of leaded gasoline. Highest summer averages were reported for anthropogenic pollutants in summer months. Aegean Sea (Izmir-Aliaga) studies of the project will be completed this year

  16. Short-term power plant operation scheduling in thermal systems with long-term boundary conditions

    International Nuclear Information System (INIS)

    Wolter, H.

    1990-01-01

    For the first time, the modeling of long-term quantitative conditions within the short-term planning of the application of power stations is made via their shadow prices. It corresponds to a decomposition of the quantitative conditions by means of the method of the Langrange relaxation. The shadow prices determined by the planning for energy application regarding long- term quantitative conditions pass into the short-term planning for power station application and subsidize or rather punish the application of limited amounts as for as they are not claimed for sufficiently or excessively. The clear advantage of this modeling is that the short-term planning of power station application can deviate from the envisioned energy application regarding the total optimum, because the shadow prices contain all information about the cost effect of the energy shifts in the residual total period, which become necessary due to the deviations in the short-term period to be planned in the current short-term period. (orig./DG) [de

  17. Hydroelectric dams need billions for rehab

    International Nuclear Information System (INIS)

    Carr, F.H.; Soast, A.

    1993-01-01

    Many of the Corps of Engineers older hydroelectric dams will require major rehabilitation over the next ten years. Preventive maintenance, repair work, and major rehabilitation of the Corp's hydro dams in inadequate because the revenue generated by sales of electricity, by law, is returned to the Treasury. Most multimillion dollar rehabilitation projects require specific approval for funding by Congress and securing it is a long and difficult process. It is hoped the funding problem will soon be addressed by the Clinton administration. Already, nearly one-sixth of the 2,154 Mw of hydro is unavailable because with hydro units are either out of service or operating at less than full capacity

  18. Improving creativity performance by short-term meditation

    Science.gov (United States)

    2014-01-01

    Background One form of meditation intervention, the integrative body-mind training (IBMT) has been shown to improve attention, reduce stress and change self-reports of mood. In this paper we examine whether short-term IBMT can improve performance related to creativity and determine the role that mood may play in such improvement. Methods Forty Chinese undergraduates were randomly assigned to short-term IBMT group or a relaxation training (RT) control group. Mood and creativity performance were assessed by the Positive and Negative Affect Schedule (PANAS) and Torrance Tests of Creative Thinking (TTCT) questionnaire respectively. Results As predicted, the results indicated that short-term (30 min per day for 7 days) IBMT improved creativity performance on the divergent thinking task, and yielded better emotional regulation than RT. In addition, cross-lagged analysis indicated that both positive and negative affect may influence creativity in IBMT group (not RT group). Conclusions Our results suggested that emotion-related creativity-promoting mechanism may be attributed to short-term meditation. PMID:24645871

  19. The greatest hydroelectric power plant in the world. Itaipu Hydroelectric Power Plant

    International Nuclear Information System (INIS)

    Andonov - Chento, Ilija

    2004-01-01

    Details to demonstrate the size and engineering achievements of one of the world's greatest hydroelectric power plant are given. Principal technical features of construction and operation of the Itaipu Dam are tabulated and discussed

  20. EPRI releases strategic plan for hydroelectric R and D

    International Nuclear Information System (INIS)

    Fickett, A.P.

    1993-01-01

    The Electric Power Research Institute has published a report identifying important research needs and issues in the hydroelectric industry. The report is based on results from a survey of representatives of the 1992 North American hydroelectric community. EPRI conducted the survey to expand upon recommendations of the North American Hydroelectric R ampersand D Forum and to develop EPRI's agenda. The report, an EPRI Strategy for Hydropower Research and Development: Rethinking our Water Resource Management Strategies, outlines an agenda for improving the use of water resources and expanding hydroelectric production at existing dams. It also proposes a new, expanded EPRI strategy within the context of the future energy needs of the US and the North American hydro research agenda

  1. The Structure and Content of Long-Term and Short-Term Mate Preferences

    Directory of Open Access Journals (Sweden)

    Peter K. Jonason

    2013-12-01

    Full Text Available This study addresses two limitations in the mate preferences literature. First, research all-too-often relies on single-item assessments of mate preferences precluding more advanced statistical techniques like factor analysis. Second, when factor analysis could be done, it exclusively has done for long-term mate preferences, at the exclusion of short-term mate preferences. In this study (N = 401, we subjected 20 items designed to measure short- and long-term mate preferences to both principle components (n = 200 and confirmatory factor analysis (n = 201. In the long-term context, we replicated previous findings that there are three different categories of preferences: physical attractiveness, interpersonal warmth, and social status. In the short-term context, physical attractiveness occupied two parts of the structure, social status dropped out, and interpersonal warmth remained. Across short- and long-term contexts, there were slight changes in what defined the shared dimensions (i.e., physical attractiveness and interpersonal warmth, suggesting prior work that applies the same inventory to each context might be flawed. We also replicated sex differences and similarities in mate preferences and correlates with sociosexuality and mate value. We adopt an evolutionary paradigm to understand our results.

  2. Short-term energy outlook, annual supplement 1994

    International Nuclear Information System (INIS)

    1994-08-01

    The Short-Term Energy Outlook Annual Supplement (Supplement) is published once a year as a complement to the Short-Term Energy Outlook (Outlook), Quarterly Projections. The purpose of the Supplement is to review the accuracy of the forecasts published in the Outlook, make comparisons with other independent energy forecasts, and examine current energy topics that affect the forecasts

  3. Short-term energy outlook annual supplement, 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-08-06

    The Short-Term Energy Outlook Annual Supplement (supplement) is published once a year as a complement to the Short-Term Energy Outlook (Outlook), Quarterly Projections. The purpose of the Supplement is to review the accuracy of the forecasts published in the Outlook, make comparisons with other independent energy forecasts, and examine current energy topics that affect the forecasts.

  4. Effects of low doses of short-term gamma irradiation on growth and development through two generations of Pisum sativum

    Energy Technology Data Exchange (ETDEWEB)

    Zaka, R.; Misset, M.T. [UMR-CNRS 6553 Ecobio, Equipe Evolution des Populations et des Especes, Universite de Rennes 1, Campus de Beaulieu Bat. 14, Rennes Cedex F 35042 (France); Chenal, C. [Laboratoire de Radiobiologie, Universite de Rennes 1, Centre Regional de Lutte contre le Cancer, Rennes Cedex F 35062 (France)

    2004-03-29

    The effects of short-term gamma radiation on pea plants were investigated by exposing 5-day-old seedlings with doses ranging from 0 to 60 Gy, and studying plant growth and development over two generations after irradiation. Doses higher than 6 Gy significantly inhibited the G1 plant growth and productivity, and no seedling survived irradiation with 40 Gy and above. These effects were transmitted and were even more severe in the next generation, G2. Irradiated G1 ({>=}10 Gy) and G2 ({>=}0.4 Gy) plants were significantly smaller than controls. The mean number of pods produced per plant was reduced by at least 20% at all doses in both G1 and G2. In parallel, the mean numbers of ovules and normally developed seeds per pod were significantly reduced after 10 Gy in G1 and after 0.4 Gy in G2, leading to a significant drop in seed production. This effect was correlated with a linear decrease in male fertility linked to abnormal meiosis (tetrads with micronuclei) as a function of doses from 0 to 10 Gy, in G1 and G2 plants. These long-term changes in plant development demonstrate a genomic instability induced by irradiation. However, there were neither quantitative nor qualitative changes in storage proteins in G1 seeds at any of the irradiation doses tested from 0 to 10 Gy.

  5. Simulation of short-term annealing of displacement cascades in FCC metals

    International Nuclear Information System (INIS)

    Heinisch, H.L.; Doran, D.G.; Schwartz, D.M.

    1980-01-01

    Computer models have been developed for the simulation of high energy displacement cascades. The objective is the generation of defect production functions for use in correlation analysis of radiation effects in fusion reactor materials. In particular, the stochastic cascade annealing simulation code SCAS has been developed and used to model the short-term annealing behavior of simulated cascades in FCC metals. The code is fast enough to make annealing of high energy cascades practical. Sets of cascades from 5 keV to 100 keV in copper were generated by the binary collision code MARLOWE

  6. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Science.gov (United States)

    2011-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-081] Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric Generating Facility Trust No. 1; Brown Bear Power, LLC; Notice of Application for Partial Transfer of License, and Soliciting...

  7. Systematic Sustainability Assessment (SSA) Tool for Hydroelectric Project in Malaysia

    Science.gov (United States)

    Turan, Faiz Mohd; Johan, Kartina

    2017-08-01

    Sustainably developed and managed hydropower has enormous potential to contribute to global sustainability goals. It is known that hydroelectricity contributing small amounts to greenhouse gas emissions and other atmospheric pollutants. However, developing the remaining hydroelectric potential offers many challenges, and public pressure and expectations on the environmental and social performance of hydroelectric tend to increase over time. This paper aims to develop Systematic Sustainability Assessment (SSA) Tool that promotes and guides more sustainable hydroelectric projects in the context of Malaysia. The proposed SSA tool which not only provide a quality and quantitative report of sustainability performance but also act as Self-Assessment Report (SAR) to provide roadmap to achieve greater level of sustainability in project management for continuous improvement. It is expected to provide a common language that allow government, civil society, financial institutions and the hydroelectric sector to talk about and evaluate sustainability issues. The advantage of SSA tool is it can be used at any stage of hydroelectric development, from the earliest planning stages right through to operation.

  8. Decentralized planning of hydroelectric power systems

    International Nuclear Information System (INIS)

    Binato, S.; Pereira, M.V.F.

    1995-01-01

    This paper discusses the application of marginal cost concepts to the expansion planning of hydroelectric systems. It is shown that the renumeration of hydroelectric plants should not be based on their energy production, as this leads to excessive revenues for the plant owner, and distorts the dimensioning of upstream reservoirs. In order to produce the adequate economic signals, it is necessary to separate the contributions of turbines and reservoirs. Examples from the Brazilian power system are presented and discussed

  9. In Search of Decay in Verbal Short-Term Memory

    Science.gov (United States)

    Berman, Marc G.; Jonides, John; Lewis, Richard L.

    2009-01-01

    Is forgetting in the short term due to decay with the mere passage of time, interference from other memoranda, or both? Past research on short-term memory has revealed some evidence for decay and a plethora of evidence showing that short-term memory is worsened by interference. However, none of these studies has directly contrasted decay and…

  10. 78 FR 6319 - Eastern Hydroelectric Corporation; Notice Rejecting Request for Rehearing

    Science.gov (United States)

    2013-01-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7019-068] Eastern... an order amending license Article 401 for Eastern Hydroelectric Corporation's (Eastern Hydroelectric....\\1\\ On January 11, 2013, Eastern Hydroelectric filed a request for rehearing of Commission staff's...

  11. Attention Problems, Phonological Short-Term Memory, and Visuospatial Short-Term Memory: Differential Effects on Near- and Long-Term Scholastic Achievement

    Science.gov (United States)

    Sarver, Dustin E.; Rapport, Mark D.; Kofler, Michael J.; Scanlan, Sean W.; Raiker, Joseph S.; Altro, Thomas A.; Bolden, Jennifer

    2012-01-01

    The current study examined individual differences in children's phonological and visuospatial short-term memory as potential mediators of the relationship among attention problems and near- and long-term scholastic achievement. Nested structural equation models revealed that teacher-reported attention problems were associated negatively with…

  12. Aquatic biology and hydroelectric power development in New Zealand

    National Research Council Canada - National Science Library

    Henriques, P. R

    1987-01-01

    .... The first section summarizes the country's hydroelectric resources and their utilization. The legal and planning framework associated with hydroelectric power development and the environment is covered in the second section...

  13. Independence of long-term contextual memory and short-term perceptual hypotheses: evidence from contextual cueing of interrupted search

    OpenAIRE

    Schlagbauer, B.; Mink, M.; Muller, Hermann J.; Geyer, T.

    2017-01-01

    Observers are able to resume an interrupted search trial faster relative to responding to a new, unseen display. This finding of rapid resumption is attributed to short-term perceptual hypotheses generated on the current look and confirmed upon subsequent looks at the same display. It has been suggested that the contents of perceptual hypotheses are similar to those of other forms of memory acquired long-term through repeated exposure to the same search displays over the course of several tri...

  14. Hydroelectric power plants may influence profit of company

    International Nuclear Information System (INIS)

    Regula, E.

    2006-01-01

    In this interview with divisional manager of the Division of control of operation of hydroelectric power plants of the Slovenske elektrarne, a.s. Mr. Milan Chudy is published. The effectiveness and its optimisation in hydroelectric power plants of the Slovenske elektrarne, a.s. are discussed

  15. Short-Term Reciprocity in Late Parent-Child Relationships

    Science.gov (United States)

    Leopold, Thomas; Raab, Marcel

    2011-01-01

    Long-term concepts of parent-child reciprocity assume that the amount of support given and received is only balanced in a generalized fashion over the life course. We argue that reciprocity in parent-child relationships also operates in the short term. Our analysis of short-term reciprocity focuses on concurrent exchange in its main upward and…

  16. Implementing a short-term loyalty program : case: Bosch Lawn & Garden and the Ventum short-term loyalty program

    OpenAIRE

    Logvinova, Veronika

    2015-01-01

    In 2015, one of the Bosch Home and Garden divisions, Bosch Lawn and Garden, has made a strategic decision to adopt a points-based short-term loyalty program called Ventum LG in the German supermarkets and petrol stations. It was decided that the base of this program will be completed Ventum PT short-term loyalty program which was managed by another division, Bosch Power Tools, and proved to be successful. This thesis aims to evaluate the worthiness of the Ventum LG loyalty program for Bosch L...

  17. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    International Nuclear Information System (INIS)

    Popa, R; Popa, B; Popa, F; Zachia-Zlatea, D

    2010-01-01

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  18. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    Energy Technology Data Exchange (ETDEWEB)

    Popa, R; Popa, B [Faculty of Power Engineering, University Politehnica of Bucharest, 313 Spl. Independentei, sect. 6, Bucharest, 060042 (Romania); Popa, F [Institute for Hydropower Studies and Design, 5-7 Vasile Lascar, sect. 2, Bucharest, 020491 (Romania); Zachia-Zlatea, D, E-mail: bogdan.popa@rosha.r [Hidroelectrica S.A., 3 Constantin Nacu, sect. 2, Bucharest, 020995 (Romania)

    2010-08-15

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  19. Fish passage hydroelectric power plant Linne, Netherlands. Didson measurements

    International Nuclear Information System (INIS)

    Van Keeken, O.A.; Griffioen, A.B.

    2011-11-01

    The hydroelectric power plant in the Dutch Maas River near Linne has a fish deflection and passage system. For this study, two evenings in the months of August and September 2011 were dedicated to examining the extent to which fish approached and used the fish passage system. To establish the swimming behavior of the fish, a high-resolution sonar (DIDSON) was used, which generates moving images of fish in turbid waters, to study their behavior. [nl

  20. Decay uncovered in nonverbal short-term memory.

    Science.gov (United States)

    Mercer, Tom; McKeown, Denis

    2014-02-01

    Decay theory posits that memory traces gradually fade away over the passage of time unless they are actively rehearsed. Much recent work exploring verbal short-term memory has challenged this theory, but there does appear to be evidence for trace decay in nonverbal auditory short-term memory. Numerous discrimination studies have reported a performance decline as the interval separating two tones is increased, consistent with a decay process. However, most of this tone comparison research can be explained in other ways, without reference to decay, and these alternative accounts were tested in the present study. In Experiment 1, signals were employed toward the end of extended retention intervals to ensure that listeners were alert to the presence and frequency content of the memoranda. In Experiment 2, a mask stimulus was employed in an attempt to distinguish between a highly detailed sensory trace and a longer-lasting short-term memory, and the distinctiveness of the stimuli was varied. Despite these precautions, slow-acting trace decay was observed. It therefore appears that the mere passage of time can lead to forgetting in some forms of short-term memory.

  1. Toxicological Effects of Caco-2 Cells Following Short-Term and Long-Term Exposure to Ag Nanoparticles

    Directory of Open Access Journals (Sweden)

    Ni Chen

    2016-06-01

    Full Text Available Extensive utilization increases the exposure of humans to Ag nanoparticles (NPs via the oral pathway. To comprehensively address the action of Ag NPs to the gastrointestinal systems in real situations, i.e., the long-term low-dose exposure, we evaluated and compared the toxicity of three Ag NPs (20–30 nm with different surface coatings to the human intestine cell Caco-2 after 1-day and 21-day exposures, using various biological assays. In both the short- and long-term exposures, the variety of surface coating predominated the toxicity of Ag NPs in a descending order of citrate-coated Ag NP (Ag-CIT, bare Ag NP (Ag-B, and poly (N-vinyl-2-pyrrolidone-coated Ag NP (Ag-PVP. The short-term exposure induced cell growth inhibition and death. The cell viability loss appeared after cells were exposed to 0.7 μg/mL Ag-CIT, 0.9 μg/mL Ag-B or >1.0 μg/mL Ag-PVP for 24 h. The short-term and higher-dose exposure also induced reactive oxygen species (ROS generation, mitochondrial damage, cell membrane leakage, apoptosis, and inflammation (IL-8 level. The long-term exposure only inhibited the cell proliferation. After 21-day exposure to 0.4 μg/mL Ag-CIT, the cell viability dropped to less than 50%, while cells exposed to 0.5 μg/mL Ag-PVP remained normal as the control. Generally, 0.3 μg/mL is the non-toxic dose for the long-term exposure of Caco-2 cells to Ag NPs in this study. However, cells presented inflammation after exposure to Ag NPs with the non-toxic dose in the long-term exposure.

  2. Hydrogen-based industry from remote excess hydroelectricity

    International Nuclear Information System (INIS)

    Ouellette, N.; Rogner, H.-H.; Scott, D.S.

    1997-01-01

    This paper examines synergies, opportunities and barriers associated with hydrogen and excess hydro-electricity in remote areas. The work is based on a case study that examined the techno-economic feasibility of a new hydrogen-based industry using surplus/off-peak generating capacity of the Taltson Dam and Generating Station in the Northwest Territories, Canada. After evaluating the amount and cost of hydrogen that could be produced from the excess capacity, the study investigates three hydrogen utilization scenarios: (1) merchant liquid or compressed hydrogen, (2) hydrogen as a chemical feedstock for the production of hydrogen peroxide, (3) methanol production from biomass, oxygen and hydrogen. Hydrogen peroxide production is the most promising and attractive strategy in the Fort Smith context. The study also illustrates patterns that recur in isolated sites throughout the world. (Author)

  3. Ultra-low-head hydroelectric technology: A review

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Daqing; Deng, Zhiqun (Daniel)

    2017-10-01

    In recent years, distributed renewable energy-generation technologies, such as wind and solar, have developed rapidly. Nevertheless, the utilization of ultra-low-head (ULH) water energy (i.e., situations where the hydraulic head is less than 3 m or the water flow is more than 0.5 m/s with zero head) has received little attention. We believe that, through technological innovations and cost reductions, ULH hydropower has the potential to become an attractive, renewable, and sustainable resource. This paper investigates potential sites for ULH energy resources, the selection of relevant turbines and generators, simplification of civil works, and project costs. This review introduces the current achievements on ULH hydroelectric technology to stimulate discussions and participation of stakeholders to develop related technologies for further expanding its utilization as an important form of renewable energy.

  4. A portable chemotaxis platform for short and long term analysis.

    Directory of Open Access Journals (Sweden)

    Chenjie Xu

    Full Text Available Flow-based microfluidic systems have been widely utilized for cell migration studies given their ability to generate versatile and precisely defined chemical gradients and to permit direct visualization of migrating cells. Nonetheless, the general need for bulky peripherals such as mechanical pumps and tubing and the complicated setup procedures significantly limit the widespread use of these microfluidic systems for cell migration studies. Here we present a simple method to power microfluidic devices for chemotaxis assays using the commercially available ALZET® osmotic pumps. Specifically, we developed a standalone chemotaxis platform that has the same footprint as a multiwell plate and can generate well-defined, stable chemical gradients continuously for up to 7 days. Using this platform, we validated the short-term (24 hours and long-term (72 hours concentration dependent PDGF-BB chemotaxis response of human bone marrow derived mesenchymal stem cells.

  5. Parent-Offspring Conflict over Short-Term Mating Strategies

    Directory of Open Access Journals (Sweden)

    Spyroulla Georgiou

    2011-12-01

    Full Text Available Individuals engage in short-term mating strategies that enable them to obtain fitness benefits from casual relationships. These benefits, however, count for less and cost more to their parents. On this basis three hypotheses are tested. First, parents and offspring are likely to disagree over short-term mating strategies, with the former considering these as less acceptable than the latter. Second, parents are more likely to disapprove of the short-term mating strategies of their daughters than of their sons. Finally, mothers and fathers are expected to agree on how much they disagree over the short-term mating strategies of their children. Evidence from a sample of 148 Greek-Cypriot families (140 mothers, 105 fathers, 119 daughters, 77 sons provides support for the first two hypotheses and partial support for the third hypothesis. The implications of these findings for understanding family dynamics are further discussed.

  6. 75 FR 35020 - Wilkesboro Hydroelectric Company, LLC; Notice Soliciting Scoping Comments

    Science.gov (United States)

    2010-06-21

    ... Hydroelectric Company, LLC; Notice Soliciting Scoping Comments June 15, 2010 Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: Wilkesboro Hydroelectric Company, LLC. e. Name of Project: W. Kerr Scott Hydropower Project. f...

  7. Baseline greenhouse gas emissions for the lower Churchill hydroelectric generation project in Labrador

    International Nuclear Information System (INIS)

    LeDrew, L.; Bastien, J.; Tremblay, A.

    2007-01-01

    Newfoundland and Labrador Hydro has proposed to develop the hydroelectric potential of the lower Churchill River by constructing generating facilities at Gull Island and Muskrat Falls. This paper presented the results of a study that was conducted to collect baseline data on greenhouse gas (GHG) fluxes/emissions of carbon dioxide (CO 2 ), methane (CH 4 ) and nitrous oxide (N 2 O) from the lower Churchill River, Smallwood reservoir, and natural lakes in the upper and lower Churchill regions. The purpose of the study was to compare GHG fluxes between the lower Churchill River, Smallwood reservoir and those of the nearby natural lakes and to compare GHG fluxes between the Smallwood reservoir and those of boreal reservoirs in northern Quebec. The paper provided a description of the site and the methodology for GHG flux measurement. The results and discussion focused on physical-chemical variables and GHG fluxes. The study results were to be used in the environmental assessment of the project. It was concluded that the lower Churchill River has higher CO 2 fluxes and lower CH 4 fluxes than the Smallwood reservoir and higher CO 2 fluxes than natural lakes in the region. There was no significant difference in N 2 O fluxes between the sampled waterbodies. Both CO 2 and CH 4 fluxes from the lower Churchill River were comparable to other Canadian reservoirs. 12 refs., 2 tabs., 6 figs

  8. High-voltage short-fall pulse generator

    International Nuclear Information System (INIS)

    Dolbilov, G.V.; Fateev, A.A.; Petrov, V.A.

    1986-01-01

    Powerful high-voltage pulses with short fall times and relatively low afterpulse amplitude are required for the deflection systems of accelerators. A generator is described that provides, into a 75-ohm load, a voltage pulse of up to 100 kV with a fall time of less than 1 nsec and a relative afterpulse amplitude of less than or equal to 15%. The generator employs a short-circuited ferrite-filled line in which shock waves are formed. A magnetic section is used to increase power. The switch is a TGI1-2500/50 thyratron. The main causes of afterpulses and methods for reducing their amplitude are examined

  9. An evaluation of short-term exposures of brake mechanics to asbestos during automotive and truck brake cleaning and machining activities.

    Science.gov (United States)

    Richter, Richard O; Finley, Brent L; Paustenbach, Dennis J; Williams, Pamela R D; Sheehan, Patrick J

    2009-07-01

    Historically, the greatest contributions to airborne asbestos concentrations during brake repair work were likely due to specific, short-duration, dust-generating activities. In this paper, the available short-term asbestos air sampling data for mechanics collected during the cleaning and machining of vehicle brakes are evaluated to determine their impact on both short-term and daily exposures. The high degree of variability and lack of transparency for most of the short-term samples limit their use in reconstructing past asbestos exposures for brake mechanics. However, the data are useful in evaluating how reducing short-term, dust-generating activities reduced long-term exposures, especially for auto brake mechanics. Using the short-term dose data for grinding brake linings from these same studies, in combination with existing time-weighted average (TWA) data collected in decades after grinding was commonplace in rebuilding brake shoes, an average 8-h TWA of approximately 0.10 f/cc was estimated for auto brake mechanics that performed arc grinding of linings during automobile brake repair (in the 1960s or earlier). In the 1970s and early 1980s, a decline in machining activities led to a decrease in the 8-h TWA to approximately 0.063 f/cc. Improved cleaning methods in the late 1980s further reduced the 8-h TWA for most brake mechanics to about 0.0021 f/cc. It is noteworthy that when compared with the original OSHA excursion level, only 15 of the more than 300 short-term concentrations for brake mechanics measured during the 1970s and 1980s possibly exceeded the standard. Considering exposure duration, none of the short-term exposures were above the current OSHA excursion level.

  10. Proceedings of a workshop on dealing with uncertainties in the hydroelectric energy business. CD-ROM ed.

    International Nuclear Information System (INIS)

    2004-01-01

    This workshop was attended by experts in Canadian and international hydroelectric utilities to exchange information on current practices and opportunities for improvement or future cooperation. The discussions focused on reducing the uncertainties associated with hydroelectric power production. Although significant improvements have been made in the efficiency, reliability and safety of hydroelectric power production, the sector is still challenged by the uncertainty of water supply which depends greatly on weather conditions. Energy markets pose another challenge to power producers in terms of energy supply, energy demand and energy prices. The workshop focused on 3 themes: (1) weather and hydrologic uncertainty, (2) market uncertainty, and (3) decision making models using uncertainty principles surrounding water resource planning and operation. The workshop featured 22 presentations of which 11 have been indexed separately for inclusion in this database. refs., tabs., figs

  11. Circadian modulation of short-term memory in Drosophila.

    Science.gov (United States)

    Lyons, Lisa C; Roman, Gregg

    2009-01-01

    Endogenous biological clocks are widespread regulators of behavior and physiology, allowing for a more efficient allocation of efforts and resources over the course of a day. The extent that different processes are regulated by circadian oscillators, however, is not fully understood. We investigated the role of the circadian clock on short-term associative memory formation using a negatively reinforced olfactory-learning paradigm in Drosophila melanogaster. We found that memory formation was regulated in a circadian manner. The peak performance in short-term memory (STM) occurred during the early subjective night with a twofold performance amplitude after a single pairing of conditioned and unconditioned stimuli. This rhythm in memory is eliminated in both timeless and period mutants and is absent during constant light conditions. Circadian gating of sensory perception does not appear to underlie the rhythm in short-term memory as evidenced by the nonrhythmic shock avoidance and olfactory avoidance behaviors. Moreover, central brain oscillators appear to be responsible for the modulation as cryptochrome mutants, in which the antennal circadian oscillators are nonfunctional, demonstrate robust circadian rhythms in short-term memory. Together these data suggest that central, rather than peripheral, circadian oscillators modulate the formation of short-term associative memory and not the perception of the stimuli.

  12. Long vs. short-term energy storage:sensitivity analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Schoenung, Susan M. (Longitude 122 West, Inc., Menlo Park, CA); Hassenzahl, William V. (,Advanced Energy Analysis, Piedmont, CA)

    2007-07-01

    This report extends earlier work to characterize long-duration and short-duration energy storage technologies, primarily on the basis of life-cycle cost, and to investigate sensitivities to various input assumptions. Another technology--asymmetric lead-carbon capacitors--has also been added. Energy storage technologies are examined for three application categories--bulk energy storage, distributed generation, and power quality--with significant variations in discharge time and storage capacity. Sensitivity analyses include cost of electricity and natural gas, and system life, which impacts replacement costs and capital carrying charges. Results are presented in terms of annual cost, $/kW-yr. A major variable affecting system cost is hours of storage available for discharge.

  13. The Role of Short-term Consolidation in Memory Persistence

    OpenAIRE

    Timothy J. Ricker

    2015-01-01

    Short-term memory, often described as working memory, is one of the most fundamental information processing systems of the human brain. Short-term memory function is necessary for language, spatial navigation, problem solving, and many other daily activities. Given its importance to cognitive function, understanding the architecture of short-term memory is of crucial importance to understanding human behavior. Recent work from several laboratories investigating the entry of information into s...

  14. The interaction of short-term and long-term memory in phonetic category formation

    Science.gov (United States)

    Harnsberger, James D.

    2002-05-01

    This study examined the role that short-term memory capacity plays in the relationship between novel stimuli (e.g., non-native speech sounds, native nonsense words) and phonetic categories in long-term memory. Thirty native speakers of American English were administered five tests: categorial AXB discrimination using nasal consonants from Malayalam; categorial identification, also using Malayalam nasals, which measured the influence of phonetic categories in long-term memory; digit span; nonword span, a short-term memory measure mediated by phonetic categories in long-term memory; and paired-associate word learning (word-word and word-nonword pairs). The results showed that almost all measures were significantly correlated with one another. The strongest predictor for the discrimination and word-nonword learning results was nonword (r=+0.62) and digit span (r=+0.51), respectively. When the identification test results were partialed out, only nonword span significantly correlated with discrimination. The results show a strong influence of short-term memory capacity on the encoding of phonetic detail within phonetic categories and suggest that long-term memory representations regulate the capacity of short-term memory to preserve information for subsequent encoding. The results of this study will also be discussed with regards to resolving the tension between episodic and abstract models of phonetic category structure.

  15. Semantic and phonological contributions to short-term repetition and long-term cued sentence recall.

    Science.gov (United States)

    Meltzer, Jed A; Rose, Nathan S; Deschamps, Tiffany; Leigh, Rosie C; Panamsky, Lilia; Silberberg, Alexandra; Madani, Noushin; Links, Kira A

    2016-02-01

    The function of verbal short-term memory is supported not only by the phonological loop, but also by semantic resources that may operate on both short and long time scales. Elucidation of the neural underpinnings of these mechanisms requires effective behavioral manipulations that can selectively engage them. We developed a novel cued sentence recall paradigm to assess the effects of two factors on sentence recall accuracy at short-term and long-term stages. Participants initially repeated auditory sentences immediately following a 14-s retention period. After this task was complete, long-term memory for each sentence was probed by a two-word recall cue. The sentences were either concrete (high imageability) or abstract (low imageability), and the initial 14-s retention period was filled with either an undemanding finger-tapping task or a more engaging articulatory suppression task (Exp. 1, counting backward by threes; Exp. 2, repeating a four-syllable nonword). Recall was always better for the concrete sentences. Articulatory suppression reduced accuracy in short-term recall, especially for abstract sentences, but the sentences initially recalled following articulatory suppression were retained better at the subsequent cued-recall test, suggesting that the engagement of semantic mechanisms for short-term retention promoted encoding of the sentence meaning into long-term memory. These results provide a basis for using sentence imageability and subsequent memory performance as probes of semantic engagement in short-term memory for sentences.

  16. Short-term and long-term sick-leave in Sweden

    DEFF Research Database (Denmark)

    Blank, N; Diderichsen, Finn

    1995-01-01

    The primary aim of the study was to analyse similarities and differences between repeated spells of short-term sick-leave (more than 3 spells of less than 7 days' duration in a 12-month period) and long-term absence through sickness (at least 1 spell of more than 59 days' duration in a 12-month p...

  17. An analysis on the short-term sectoral competitiveness impact of carbon tax in China

    International Nuclear Information System (INIS)

    Wang Xin; Li Ji Feng; Zhang Yaxiong

    2011-01-01

    Market-based instruments, particularly carbon tax, have recently drawn the attention of Chinese government by their cost-effective contribution to the achievement of China's climate targets. Most of the recent policy proposals have focused on its long-term impact. However, particularly for policy makers, both long term and short term effects of carbon tax would be necessary when determining tax rates. We provided a detailed analysis of short-term impacts of carbon tax on sectoral competitiveness in this paper. We divided China's economy into 36 sectors, based on its 2007 input-output table, in order to examine the ratio of carbon tax added costs to sector GDP. We were thus able to determine the impact level of a carbon tax on each sector. We then divided the sectoral trade impact into domestic competitiveness with regards to foreign imported products and international competitiveness external to the Chinese domestic market. We found that a high tax level (100 yuan/t CO 2 ) may necessitate compensatory measures to certain highly affected industries, and that a low tax rate (10 yuan/t CO 2 ) would generate few competitiveness problems for all industries and may therefore be considered as an appropriate starting point. - Highlights: → We study short-term sectoral competitiveness impact of carbon tax in China. → For each sector, we study its carbon cost, GDP share and trade intensity. → A high rate (100 yuan/t CO 2 ) may require compensatory measures to certain industries. → A low rate (10 yuan/t CO 2 ) would generate few competitiveness problems.

  18. Effects of low doses of short-term gamma irradiation on growth and development through two generations of Pisum sativum

    International Nuclear Information System (INIS)

    Zaka, R.; Misset, M.T.; Chenal, C.

    2004-01-01

    The effects of short-term gamma radiation on pea plants were investigated by exposing 5-day-old seedlings with doses ranging from 0 to 60 Gy, and studying plant growth and development over two generations after irradiation. Doses higher than 6 Gy significantly inhibited the G1 plant growth and productivity, and no seedling survived irradiation with 40 Gy and above. These effects were transmitted and were even more severe in the next generation, G2. Irradiated G1 (≥10 Gy) and G2 (≥0.4 Gy) plants were significantly smaller than controls. The mean number of pods produced per plant was reduced by at least 20% at all doses in both G1 and G2. In parallel, the mean numbers of ovules and normally developed seeds per pod were significantly reduced after 10 Gy in G1 and after 0.4 Gy in G2, leading to a significant drop in seed production. This effect was correlated with a linear decrease in male fertility linked to abnormal meiosis (tetrads with micronuclei) as a function of doses from 0 to 10 Gy, in G1 and G2 plants. These long-term changes in plant development demonstrate a genomic instability induced by irradiation. However, there were neither quantitative nor qualitative changes in storage proteins in G1 seeds at any of the irradiation doses tested from 0 to 10 Gy

  19. An accident diagnosis algorithm using long short-term memory

    Directory of Open Access Journals (Sweden)

    Jaemin Yang

    2018-05-01

    Full Text Available Accident diagnosis is one of the complex tasks for nuclear power plant (NPP operators. In abnormal or emergency situations, the diagnostic activity of the NPP states is burdensome though necessary. Numerous computer-based methods and operator support systems have been suggested to address this problem. Among them, the recurrent neural network (RNN has performed well at analyzing time series data. This study proposes an algorithm for accident diagnosis using long short-term memory (LSTM, which is a kind of RNN, which improves the limitation for time reflection. The algorithm consists of preprocessing, the LSTM network, and postprocessing. In the LSTM-based algorithm, preprocessed input variables are calculated to output the accident diagnosis results. The outputs are also postprocessed using softmax to determine the ranking of accident diagnosis results with probabilities. This algorithm was trained using a compact nuclear simulator for several accidents: a loss of coolant accident, a steam generator tube rupture, and a main steam line break. The trained algorithm was also tested to demonstrate the feasibility of diagnosing NPP accidents. Keywords: Accident Diagnosis, Long Short-term Memory, Recurrent Neural Network, Softmax

  20. Short-term Consumer Benefits of Dynamic Pricing

    OpenAIRE

    Dupont, Benjamin; De Jonghe, Cedric; Kessels, Kris; Belmans, Ronnie

    2011-01-01

    Consumer benefits of dynamic pricing depend on a variety of factors. Consumer characteristics and climatic circumstances widely differ, which forces a regional comparison. This paper presents a general overview of demand response programs and focuses on the short-term benefits of dynamic pricing for an average Flemish residential consumer. It reaches a methodology to develop a cost reflective dynamic pricing program and to estimate short-term bill savings. Participating in a dynamic pricing p...

  1. Comparison of two new short-term wind-power forecasting systems

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez-Rosado, Ignacio J. [Department of Electrical Engineering, University of Zaragoza, Zaragoza (Spain); Fernandez-Jimenez, L. Alfredo [Department of Electrical Engineering, University of La Rioja, Logrono (Spain); Monteiro, Claudio; Sousa, Joao; Bessa, Ricardo [FEUP, Fac. Engenharia Univ. Porto (Portugal)]|[INESC - Instituto de Engenharia de Sistemas e Computadores do Porto, Porto (Portugal)

    2009-07-15

    This paper presents a comparison of two new advanced statistical short-term wind-power forecasting systems developed by two independent research teams. The input variables used in both systems were the same: forecasted meteorological variable values obtained from a numerical weather prediction model; and electric power-generation registers from the SCADA system of the wind farm. Both systems are described in detail and the forecasting results compared, revealing great similarities, although the proposed structures of the two systems are different. The forecast horizon for both systems is 72 h, allowing the use of the forecasted values in electric market operations, as diary and intra-diary power generation bid offers, and in wind-farm maintenance planning. (author)

  2. Musical and Verbal Memory in Alzheimer's Disease: A Study of Long-Term and Short-Term Memory

    Science.gov (United States)

    Menard, Marie-Claude; Belleville, Sylvie

    2009-01-01

    Musical memory was tested in Alzheimer patients and in healthy older adults using long-term and short-term memory tasks. Long-term memory (LTM) was tested with a recognition procedure using unfamiliar melodies. Short-term memory (STM) was evaluated with same/different judgment tasks on short series of notes. Musical memory was compared to verbal…

  3. Applying a CAD-generated imaging marker to assess short-term breast cancer risk

    Science.gov (United States)

    Mirniaharikandehei, Seyedehnafiseh; Zarafshani, Ali; Heidari, Morteza; Wang, Yunzhi; Aghaei, Faranak; Zheng, Bin

    2018-02-01

    Although whether using computer-aided detection (CAD) helps improve radiologists' performance in reading and interpreting mammograms is controversy due to higher false-positive detection rates, objective of this study is to investigate and test a new hypothesis that CAD-generated false-positives, in particular, the bilateral summation of false-positives, is a potential imaging marker associated with short-term breast cancer risk. An image dataset involving negative screening mammograms acquired from 1,044 women was retrospectively assembled. Each case involves 4 images of craniocaudal (CC) and mediolateral oblique (MLO) view of the left and right breasts. In the next subsequent mammography screening, 402 cases were positive for cancer detected and 642 remained negative. A CAD scheme was applied to process all "prior" negative mammograms. Some features from CAD scheme were extracted, which include detection seeds, the total number of false-positive regions, an average of detection scores and the sum of detection scores in CC and MLO view images. Then the features computed from two bilateral images of left and right breasts from either CC or MLO view were combined. In order to predict the likelihood of each testing case being positive in the next subsequent screening, two logistic regression models were trained and tested using a leave-one-case-out based cross-validation method. Data analysis demonstrated the maximum prediction accuracy with an area under a ROC curve of AUC=0.65+/-0.017 and the maximum adjusted odds ratio of 4.49 with a 95% confidence interval of [2.95, 6.83]. The results also illustrated an increasing trend in the adjusted odds ratio and risk prediction scores (pbreast cancer risk.

  4. Increase of hydroelectric power plant operation reliability

    International Nuclear Information System (INIS)

    Koshumbaev, M.B.

    2006-01-01

    The new design of the turbine of hydroelectric power plant (HPP) is executed in the form of a pipe with plates. Proposed solution allows increasing the hydroelectric power plant capacity at existing head and water flow. At that time the HPP turbine reliability is increase, its operation performances are improving. Design efficiency is effective mostly for small-scale and micro-HPP due to reliable operation, low-end technology, and harmless ecological application. (author)

  5. Do Short-Term Managerial Objectives Lead to Under- or Over-Investment in Long-Term Projects

    OpenAIRE

    Lucian Arye Bebchuk; Lars A. Stole

    1994-01-01

    This paper studies managerial decisions about investment in long-run projects in the presence of imperfect information (the market knows less about such investments than the firm's managers) and short-term managerial objectives (the managers are concerned about the short-term stock price as well as the long-term stock price). Prior work has suggested that imperfect information and short-term managerial objectives induce managers to underinvest in long-run projects. We show that either underin...

  6. The hydroelectric power market in the United States

    International Nuclear Information System (INIS)

    2002-01-01

    The second-largest producer of hydroelectric power in the world is the United States, right after Canada. In the United States, 7.1 per cent of net electricity generation was attributed to hydroelectric power in 2000, which totalled 269 terawatt hours (TWh). Aging facilities, outdated technology in some facilities, a cumbersome licensing process, and increasing environmental demands from interest groups for the preservation of river systems and surrounding wildlife challenge the industry. Pacific Coast states, especially California, were faced with electric power shortages during the summer of 2001, due to low market prices, high power usage among consumers and drought. The problems with the deregulation of the electricity market were brought to light by these shortages. Legislation to restructure the electric power industry in 25 states had not been enacted as of January 2002. The purchase of more power from both Canada and the Mexico is being considered by the government of the United States, as is the creation of a national power grid to allow for power transmission throughout the country. The Canada-United States energy trade might be affected by such a move, and result in project construction opportunities for Canadian companies. Renewable energy sources must be responsible for the generation of 10 per cent of power generation levels by 2020, on a gradual basis as mandated by law. By 2005, New York City must purchase 10 per cent of its power from renewable energy sources, reaching 20 per cent by 2010. The repair and replacement of aging dam equipment, the development of advanced turbine technology to protect fish stocks and water quality, dam removal, the construction of power lines are all opportunities open to Canadian companies. 60 refs., 5 tabs

  7. Sleep Quality, Short-Term and Long-Term CPAP Adherence

    Science.gov (United States)

    Somiah, Manya; Taxin, Zachary; Keating, Joseph; Mooney, Anne M.; Norman, Robert G.; Rapoport, David M.; Ayappa, Indu

    2012-01-01

    Study Objectives: Adherence to CPAP therapy is low in patients with obstructive sleep apnea/hypopnea syndrome (OSAHS). The purpose of the present study was to evaluate the utility of measures of sleep architecture and sleep continuity on the CPAP titration study as predictors of both short- and long-term CPAP adherence. Methods: 93 patients with OSAHS (RDI 42.8 ± 34.3/h) underwent in-laboratory diagnostic polysomnography, CPAP titration, and follow-up polysomnography (NPSG) on CPAP. Adherence to CPAP was objectively monitored. Short-term (ST) CPAP adherence was averaged over 14 days immediately following the titration study. Long-term (LT) CPAP adherence was obtained in 56/93 patients after approximately 2 months of CPAP use. Patients were grouped into CPAP adherence groups for ST ( 4 h) and LT adherence ( 4 h). Sleep architecture, sleep disordered breathing (SDB) indices, and daytime outcome variables from the diagnostic and titration NPSGs were compared between CPAP adherence groups. Results: There was a significant relationship between ST and LT CPAP adherence (r = 0.81, p CPAP adherence groups had significantly lower %N2 and greater %REM on the titration NPSG. A model combining change in sleep efficiency and change in sleep continuity between the diagnostic and titration NPSGs predicted 17% of the variance in LT adherence (p = 0.006). Conclusions: These findings demonstrate that characteristics of sleep architecture, even on the titration NPSG, may predict some of the variance in CPAP adherence. Better sleep quality on the titration night was related to better CPAP adherence, suggesting that interventions to improve sleep on/prior to the CPAP titration study might be used as a therapeutic intervention to improve CPAP adherence. Citation: Somiah M; Taxin Z; Keating J; Mooney AM; Norman RG; Rapoport DM; Ayappa I. Sleep quality, short-term and long-term CPAP adherence. J Clin Sleep Med 2012;8(5):489-500. PMID:23066359

  8. Transmodal comparison of auditory, motor, and visual post-processing with and without intentional short-term memory maintenance.

    Science.gov (United States)

    Bender, Stephan; Behringer, Stephanie; Freitag, Christine M; Resch, Franz; Weisbrod, Matthias

    2010-12-01

    To elucidate the contributions of modality-dependent post-processing in auditory, motor and visual cortical areas to short-term memory. We compared late negative waves (N700) during the post-processing of single lateralized stimuli which were separated by long intertrial intervals across the auditory, motor and visual modalities. Tasks either required or competed with attention to post-processing of preceding events, i.e. active short-term memory maintenance. N700 indicated that cortical post-processing exceeded short movements as well as short auditory or visual stimuli for over half a second without intentional short-term memory maintenance. Modality-specific topographies pointed towards sensory (respectively motor) generators with comparable time-courses across the different modalities. Lateralization and amplitude of auditory/motor/visual N700 were enhanced by active short-term memory maintenance compared to attention to current perceptions or passive stimulation. The memory-related N700 increase followed the characteristic time-course and modality-specific topography of the N700 without intentional memory-maintenance. Memory-maintenance-related lateralized negative potentials may be related to a less lateralised modality-dependent post-processing N700 component which occurs also without intentional memory maintenance (automatic memory trace or effortless attraction of attention). Encoding to short-term memory may involve controlled attention to modality-dependent post-processing. Similar short-term memory processes may exist in the auditory, motor and visual systems. Copyright © 2010 International Federation of Clinical Neurophysiology. Published by Elsevier Ireland Ltd. All rights reserved.

  9. Assessing the associative deficit of older adults in long-term and short-term/working memory.

    Science.gov (United States)

    Chen, Tina; Naveh-Benjamin, Moshe

    2012-09-01

    Older adults exhibit a deficit in associative long-term memory relative to younger adults. However, the literature is inconclusive regarding whether this deficit is attenuated in short-term/working memory. To elucidate the issue, three experiments assessed younger and older adults' item and interitem associative memory and the effects of several variables that might potentially contribute to the inconsistent pattern of results in previous studies. In Experiment 1, participants were tested on item and associative recognition memory with both long-term and short-term retention intervals in a single, continuous recognition paradigm. There was an associative deficit for older adults in the short-term and long-term intervals. Using only short-term intervals, Experiment 2 utilized mixed and blocked test designs to examine the effect of test event salience. Blocking the test did not attenuate the age-related associative deficit seen in the mixed test blocks. Finally, an age-related associative deficit was found in Experiment 3, under both sequential and simultaneous presentation conditions. Even while accounting for some methodological issues, the associative deficit of older adults is evident in short-term/working memory.

  10. Simulation of demand side participation in Spanish short term electricity markets

    International Nuclear Information System (INIS)

    Valencia-Salazar, I.; Alvarez, C.; Escriva-Escriva, G.; Alcazar-Ortega, M.

    2011-01-01

    Highlights: → Benefits from customer active participation can be obtained with a proper generation of bids and offers. → Simulation of Spanish customers' participation is shown in daily, intra-daily and balancing markets. → Market efficiency and economics profits arise in balancing markets by using customer load reductions. → Real market prices and real customers' consumptions profiles are used in the simulations. -- Abstract: Demand response resources management is one of the most investigated solutions oriented to improve the efficiency in electricity markets. In this paper, the capability of customers to participate in short term markets is analyzed. An available methodology to analyze the daily and monthly energy consumptions of large customers is used to create energy offers and bids. This allows customers to participate in energy markets in order to buy, as first step, the usual electricity consumption and, additionally, to offer demand reductions in the short term electricity markets. Additionally, this paper shows the customer potential to participate in the Spanish electricity markets.

  11. The emergence of small hydroelectric plants and the urbanization process in the hinterland of São Paulo state (1890-1930

    Directory of Open Access Journals (Sweden)

    Débora Marques de Almeida Nogueira Mortati

    2011-06-01

    Full Text Available The period focused in this paper is from 1890 to 1930, when São Paulo state began its industrialization process, the coffee economy was booming and, in that context, it was founded the first hydroelectric power company in the state. This panorama advanced till 1930, when the coffee economy began in crisis, the industry was already established and the construction of hydroelectric plants after 1930 takes on another course: the large dams, closing the cycle of small hydroelectric plants. The electricity generation in Brazil follows the paths of the railroad; and it was drawing newborders between rural and urban, rural and industry. The cities aspect was changing as the “improvements” were availability, many powered by electricity. The nascent industries were also occupying the space between the railroad and energy; what created new districts and centralities. Thispaper analyzes the processes that hydroelectric energy sets off in São Paulo state; and focuses on itsconsequences.

  12. The pedagogy of Short-Term Study-Abroad Programs

    Directory of Open Access Journals (Sweden)

    Jude Gonsalvez

    2013-10-01

    Full Text Available This paper focuses on establishing guidelines on the pedagogy of short term study abroad programs. This study follows 33 students who participated in a short-term study-abroad program to India with the researcher from 2006 through 2011. The study relies heavily on the student reflections and expressions as they experienced them. It is qualitative in nature. Focus groups were the main method of data collection, where participants were invited to reflect, express, and share their experiences with one another. This provided an opportunity for the participants to come together, relive their experiences, and help provide information as to how and what type of an influence this short-term study-abroad program provided.

  13. Electricity trade: Generating benefits for British Columbians

    International Nuclear Information System (INIS)

    1994-01-01

    Electricity has been traded in British Columbia since the turn of the century. In 1988, the provincial government established the British Columbia Power Exchange Corporation (Powerex) to conduct electricity trade activities in order to make the most efficient use of the electrial system and generate benefits for British Columbians. The trade is made possible by an interconnected system linking producers and consumers in western Canada and the USA. Provincial participants in the trade include British Columbia Hydro, independent power producers, and cogenerators. Benefits of the electricity trade include generation of revenue from sale of surplus power, being able to buy electricity when the mainly hydroelectric provincial system is in a drought condition or when major shutdowns occur, and enabling postponement of development of new power projects. Powerex conducts its trade under provincial and federal permits and licenses. Different types of trade contracts are negotiated depending on the amount and availability of electricity and the kind of trade being conducted. Exchanges and coordination agreements allow transfer and return between utilities with no net export occurring, allowing balancing of loads between different reigons. Surplus electricity is bought or sold on a short- or long-term basis and on firm or non-firm terms. Electricity exports are not subsidized and are only allowed if the electricity is surplus to provincial needs and can be sold at a profit. A new provincial policy allows private industry to export long-term firm electricity; this involves construction of new private-sector generating facilities solely for the purpose of export. 1 fig

  14. Small hydroelectric power plants - shelf goods or tailor-made?

    International Nuclear Information System (INIS)

    Aas, Trond R.

    2002-01-01

    If small hydroelectric power plants are defined to be hydroelectric power plants of up to a few 1000 kW, they should be shelf goods because of cost considerations. Design of small hydroelectric power plants is a many-sided optimization task, on a level with constructing larger hydro power plants. But the budget for a small hydro power plant does not permit any comprehensive evaluations. The most important costs are the one-time costs in the form of investments and the following annual costs in the form of operation and maintenance, and losses. Financing costs are not considered in this article

  15. The obtention of high reliability levels to the increasing of power in hydroelectric generators of modern power plants; A obtencao de altos indices de confiabilidade no aumento de potencia em hidrogeradores de usinas modernizadas

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Octavio A.; Uemori, Mauro K.I.; Spiridon, Michel W. [Asea Brown Boveri Ltda., Osasco, SP (Brazil)

    1993-12-31

    The increase in the power capacity of the generators of existing hydroelectric power plants is presented as an alternative technically feasible and economically advantageous to the increase of the power generation capacity of the Brazilian electric power system. This work presents the need of a global analysis of each case in order to optimize this process and also presents a methodology which may be applied to electric power generators, turbines, transformers and other electrical equipment. 2 refs., 8 figs.

  16. Application of fuzzy logic in mapping the environmental impacts of hydroelectric power plants; Aplicacao da logica difusa no mapeamento de impactos ambientais em usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Melo, M.N.; Lambert-Torres, G.; Silva, L.E. Borges da [Universidade Federal de Itajuba (UNIFEI), MG (Brazil)], Emails: germanoltorres@gmail.com, leborges@unifei.edu.br; Rissino, S.; Silva, M.F. da [Universidade Federal de Rondonia (UFRO), Porto Velho, RO (Brazil)], e-mails: srissino@gmail.com, felipe@unir.br

    2009-07-01

    During the stages prior to installation of a large enterprise, there is an obligation to obtain an environmental license for its effectiveness. However, defining the relevance of an environmental impact generated by changes elapsed in a region, is something subjective, since some variables present qualitative definitions. Aiming to interrelate the variables that influence the environmental impacts in hydroelectric plants, was made the mapping of terms natural resources and degradation of the environment, and its defining variables, based on the theory of fuzzy logic. The construction of fuzzy propositions was based on the manipulation of a rule base, with the 'if' antecedent 'then' consequent structure. It was concluded that the use of fuzzy propositions for the study of environmental impact is an effective method to map the environmental impact caused by construction of a hydroelectric plant, because it defines the degree of influence of impact on the environment.

  17. Deterministic and probabilistic interval prediction for short-term wind power generation based on variational mode decomposition and machine learning methods

    International Nuclear Information System (INIS)

    Zhang, Yachao; Liu, Kaipei; Qin, Liang; An, Xueli

    2016-01-01

    Highlights: • Variational mode decomposition is adopted to process original wind power series. • A novel combined model based on machine learning methods is established. • An improved differential evolution algorithm is proposed for weight adjustment. • Probabilistic interval prediction is performed by quantile regression averaging. - Abstract: Due to the increasingly significant energy crisis nowadays, the exploitation and utilization of new clean energy gains more and more attention. As an important category of renewable energy, wind power generation has become the most rapidly growing renewable energy in China. However, the intermittency and volatility of wind power has restricted the large-scale integration of wind turbines into power systems. High-precision wind power forecasting is an effective measure to alleviate the negative influence of wind power generation on the power systems. In this paper, a novel combined model is proposed to improve the prediction performance for the short-term wind power forecasting. Variational mode decomposition is firstly adopted to handle the instability of the raw wind power series, and the subseries can be reconstructed by measuring sample entropy of the decomposed modes. Then the base models can be established for each subseries respectively. On this basis, the combined model is developed based on the optimal virtual prediction scheme, the weight matrix of which is dynamically adjusted by a self-adaptive multi-strategy differential evolution algorithm. Besides, a probabilistic interval prediction model based on quantile regression averaging and variational mode decomposition-based hybrid models is presented to quantify the potential risks of the wind power series. The simulation results indicate that: (1) the normalized mean absolute errors of the proposed combined model from one-step to three-step forecasting are 4.34%, 6.49% and 7.76%, respectively, which are much lower than those of the base models and the hybrid

  18. Genetic deletion of melanin-concentrating hormone neurons impairs hippocampal short-term synaptic plasticity and hippocampal-dependent forms of short-term memory.

    Science.gov (United States)

    Le Barillier, Léa; Léger, Lucienne; Luppi, Pierre-Hervé; Fort, Patrice; Malleret, Gaël; Salin, Paul-Antoine

    2015-11-01

    The cognitive role of melanin-concentrating hormone (MCH) neurons, a neuronal population located in the mammalian postero-lateral hypothalamus sending projections to all cortical areas, remains poorly understood. Mainly activated during paradoxical sleep (PS), MCH neurons have been implicated in sleep regulation. The genetic deletion of the only known MCH receptor in rodent leads to an impairment of hippocampal dependent forms of memory and to an alteration of hippocampal long-term synaptic plasticity. By using MCH/ataxin3 mice, a genetic model characterized by a selective deletion of MCH neurons in the adult, we investigated the role of MCH neurons in hippocampal synaptic plasticity and hippocampal-dependent forms of memory. MCH/ataxin3 mice exhibited a deficit in the early part of both long-term potentiation and depression in the CA1 area of the hippocampus. Post-tetanic potentiation (PTP) was diminished while synaptic depression induced by repetitive stimulation was enhanced suggesting an alteration of pre-synaptic forms of short-term plasticity in these mice. Behaviorally, MCH/ataxin3 mice spent more time and showed a higher level of hesitation as compared to their controls in performing a short-term memory T-maze task, displayed retardation in acquiring a reference memory task in a Morris water maze, and showed a habituation deficit in an open field task. Deletion of MCH neurons could thus alter spatial short-term memory by impairing short-term plasticity in the hippocampus. Altogether, these findings could provide a cellular mechanism by which PS may facilitate memory encoding. Via MCH neuron activation, PS could prepare the day's learning by increasing and modulating short-term synaptic plasticity in the hippocampus. © 2015 Wiley Periodicals, Inc.

  19. Relationship between short and long term radon measurements

    International Nuclear Information System (INIS)

    Martinez, T.; Ramirez, D.; Navarrete, M.; Cabrera, L.; Ramirez, A.; Gonzalez, P.

    2000-01-01

    In this work the radon group of the Faculty of Chemistry at the National University of Mexico presents the results obtained in the establishment of a relation between the short and long term radon measures made with passive electret detectors E-PERM type LLT and HST. The measures were carried out inside single family dwellings (open house condition) located in the southeast of Mexico City (in Xochimilco) during the four seasons of the year 1997. A correlation was established between the short term measures (five days) and those of a long term for every season as well as an annual average, with an equation that relates them. The objective and advantage of this correlation are that with a short term measure it is possible to predict the annual mean radon concentration, that represents a saving of human and economic resources. (author)

  20. Impact of short-term severe accident management actions in a long-term perspective. Final Report

    International Nuclear Information System (INIS)

    2000-03-01

    The present systems for severe accident management are focused on mitigating the consequences of special severe accident phenomena and to reach a safe plant state. However, in the development of strategies and procedures for severe accident management, it is also important to consider the long-term perspective of accident management and especially to secure the safe state of the plant. The main reason for this is that certain short-term actions have an impact on the long-term scenario. Both positive and negative effects from short-term actions on the accident management in the long-term perspective have been included in this paper. Short-term actions are accident management measures taken within about 24 hours after the initiating event. The purpose of short-term actions is to reach a stable status of the plant. The main goal in the long-term perspective is to maintain the reactor in a stable state and prevent uncontrolled releases of activity. The purpose of this short Technical Note, deliberately limited in scope, is to draw attention to potential long-term problems, important to utilities and regulatory authorities, arising from the way a severe accident would be managed during the first hours. Its objective is to encourage discussions on the safest - and maybe also most economical - way to manage a severe accident in the long term by not making the situation worse through inappropriate short-term actions, and on the identification of short-term actions likely to make long-term management easier and safer. The Note is intended as a contribution to the knowledge base put at the disposal of Member countries through international collaboration. The scope of the work has been limited to a literature search. Useful further activities have been identified. However, there is no proposal, at this stage, for more detailed work to be undertaken under the auspices of the CSNI. Plant-specific applications would need to be developed by utilities

  1. Ordered short-term memory differs in signers and speakers: Implications for models of short-term memory

    OpenAIRE

    Bavelier, Daphne; Newport, Elissa L.; Hall, Matt; Supalla, Ted; Boutla, Mrim

    2008-01-01

    Capacity limits in linguistic short-term memory (STM) are typically measured with forward span tasks in which participants are asked to recall lists of words in the order presented. Using such tasks, native signers of American Sign Language (ASL) exhibit smaller spans than native speakers (Boutla, Supalla, Newport, & Bavelier, 2004). Here, we test the hypothesis that this population difference reflects differences in the way speakers and signers maintain temporal order information in short-te...

  2. Short-term and long-term deflection of reinforced hollow core ...

    African Journals Online (AJOL)

    This paper presents a study on different methods of analysis that are currently used by design codes to predict the short-term and long-term deflection of reinforced concrete slab systems and compares the predicted deflections with measured deflections. The experimental work to measure deflections involved the testing of ...

  3. Robust short-term memory without synaptic learning.

    Directory of Open Access Journals (Sweden)

    Samuel Johnson

    Full Text Available Short-term memory in the brain cannot in general be explained the way long-term memory can--as a gradual modification of synaptic weights--since it takes place too quickly. Theories based on some form of cellular bistability, however, do not seem able to account for the fact that noisy neurons can collectively store information in a robust manner. We show how a sufficiently clustered network of simple model neurons can be instantly induced into metastable states capable of retaining information for a short time (a few seconds. The mechanism is robust to different network topologies and kinds of neural model. This could constitute a viable means available to the brain for sensory and/or short-term memory with no need of synaptic learning. Relevant phenomena described by neurobiology and psychology, such as local synchronization of synaptic inputs and power-law statistics of forgetting avalanches, emerge naturally from this mechanism, and we suggest possible experiments to test its viability in more biological settings.

  4. Robust short-term memory without synaptic learning.

    Science.gov (United States)

    Johnson, Samuel; Marro, J; Torres, Joaquín J

    2013-01-01

    Short-term memory in the brain cannot in general be explained the way long-term memory can--as a gradual modification of synaptic weights--since it takes place too quickly. Theories based on some form of cellular bistability, however, do not seem able to account for the fact that noisy neurons can collectively store information in a robust manner. We show how a sufficiently clustered network of simple model neurons can be instantly induced into metastable states capable of retaining information for a short time (a few seconds). The mechanism is robust to different network topologies and kinds of neural model. This could constitute a viable means available to the brain for sensory and/or short-term memory with no need of synaptic learning. Relevant phenomena described by neurobiology and psychology, such as local synchronization of synaptic inputs and power-law statistics of forgetting avalanches, emerge naturally from this mechanism, and we suggest possible experiments to test its viability in more biological settings.

  5. Robust Short-Term Memory without Synaptic Learning

    Science.gov (United States)

    Johnson, Samuel; Marro, J.; Torres, Joaquín J.

    2013-01-01

    Short-term memory in the brain cannot in general be explained the way long-term memory can – as a gradual modification of synaptic weights – since it takes place too quickly. Theories based on some form of cellular bistability, however, do not seem able to account for the fact that noisy neurons can collectively store information in a robust manner. We show how a sufficiently clustered network of simple model neurons can be instantly induced into metastable states capable of retaining information for a short time (a few seconds). The mechanism is robust to different network topologies and kinds of neural model. This could constitute a viable means available to the brain for sensory and/or short-term memory with no need of synaptic learning. Relevant phenomena described by neurobiology and psychology, such as local synchronization of synaptic inputs and power-law statistics of forgetting avalanches, emerge naturally from this mechanism, and we suggest possible experiments to test its viability in more biological settings. PMID:23349664

  6. Overhaul of the generator of the hydroelectric central station Ingeniero Carlos Ramirez Ulloa; Rehabilitacion del generador de la unidad 2 de la central hidroelectrica ingeniero Carlos Ramirez Ulloa

    Energy Technology Data Exchange (ETDEWEB)

    Robles Pimentel, Edgar [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Garcia Hernandez, Javier [Comision Federal de Electricidad, Mexico, D. F. (Mexico)

    1997-12-31

    In November 1995, the failure of the Unit 2 generator at the hydroelectric central station Ingeniero Carlos Ramirez Ulloa, El Caracol, occurred. The accident forced to carry out its overhaul. Here are presented the technical problems faced during the overhaul of the generator and analyzed the implemented solutions. [Espanol] En noviembre de 1995 ocurrio la falla del generador de la unidad 2 de la central hidroelectrica Ing. Carlos Ramirez Ulloa, El Caracol. El accidente obligo a llevar a cabo su rehabilitacion. Se presentan los problemas tecnicos enfrentados durante la rehabilitacion del generador y se discuten las soluciones implementadas.

  7. Overhaul of the generator of the hydroelectric central station Ingeniero Carlos Ramirez Ulloa; Rehabilitacion del generador de la unidad 2 de la central hidroelectrica ingeniero Carlos Ramirez Ulloa

    Energy Technology Data Exchange (ETDEWEB)

    Robles Pimentel, Edgar [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Garcia Hernandez, Javier [Comision Federal de Electricidad, Mexico, D. F. (Mexico)

    1998-12-31

    In November 1995, the failure of the Unit 2 generator at the hydroelectric central station Ingeniero Carlos Ramirez Ulloa, El Caracol, occurred. The accident forced to carry out its overhaul. Here are presented the technical problems faced during the overhaul of the generator and analyzed the implemented solutions. [Espanol] En noviembre de 1995 ocurrio la falla del generador de la unidad 2 de la central hidroelectrica Ing. Carlos Ramirez Ulloa, El Caracol. El accidente obligo a llevar a cabo su rehabilitacion. Se presentan los problemas tecnicos enfrentados durante la rehabilitacion del generador y se discuten las soluciones implementadas.

  8. Short-Term Wind Power Forecasting Using the Enhanced Particle Swarm Optimization Based Hybrid Method

    OpenAIRE

    Wen-Yeau Chang

    2013-01-01

    High penetration of wind power in the electricity system provides many challenges to power system operators, mainly due to the unpredictability and variability of wind power generation. Although wind energy may not be dispatched, an accurate forecasting method of wind speed and power generation can help power system operators reduce the risk of an unreliable electricity supply. This paper proposes an enhanced particle swarm optimization (EPSO) based hybrid forecasting method for short-term wi...

  9. Short-term memory binding deficits in Alzheimer's disease

    OpenAIRE

    Parra, Mario; Abrahams, S.; Fabi, K.; Logie, R.; Luzzi, S.; Della Sala, Sergio

    2009-01-01

    Alzheimer's disease impairs long term memories for related events (e.g. faces with names) more than for single events (e.g. list of faces or names). Whether or not this associative or ‘binding’ deficit is also found in short-term memory has not yet been explored. In two experiments we investigated binding deficits in verbal short-term memory in Alzheimer's disease. Experiment 1 : 23 patients with Alzheimer's disease and 23 age and education matched healthy elderly were recruited. Participants...

  10. Seasonal variation in plasma nonesterified fatty acids of Lake Sturgeon (Acipenser fulvescens) in the vicinity of hydroelectric facilities

    International Nuclear Information System (INIS)

    McKinley, R.S.; Power, G.; Singer, T.D.; Ballantyne, J.S.

    1993-01-01

    To establish the effects of hydroelectric generation on the health of lake sturgeon (Acipenser fulvescens), seasonal variations in plasma nonesterified fatty acids (NEFAs) upstream and downstream from hydroelectric stations were measured over a 2-y period. Plasma NEFA profiles were also compared up- and downstream of the stations for differences in utilization of individual NEFA species as substrates for lipid oxidation. Significantly higher levels of total plasma NEFA were found in lake sturgeon upstream (2355 ± 395.9 nmole/ml) compared with those downstream (798 ± 133.5 nmole/ml) of the generating stations during the spring. The NEFA profiles for several key fatty acid species differed significantly among seasons up- and downstream of the facilities. In particular, during spring and summer, the levels of oleic acid (18:1n9) were highest upstream of the stations and levels of a polyunsaturated fatty acid, docosahexaenoic acid (22:6n3), were higher below rather than above the stations. The differences in plasma NEFA concentration may be attributed to altered nutritional status due to the varying flow regime located downstream of the hydroelectric stations. 33 refs., 4 figs., 1 tab

  11. Relationship between short-term sexual strategies and sexual jealousy.

    Science.gov (United States)

    Mathes, Eugene W

    2005-02-01

    In a classic study, Buss, Larson, Westen, and Semmelroth reported that men were more distressed by the thought of a partner's sexual infidelity (sexual jealousy) and women were more distressed by the thought of a partner's emotional infidelity (emotional jealousy). Initially, Buss and his associates explained these results by suggesting that men are concerned about uncertainty of paternity, that is, the possibility of raising another man's child while believing the child is their own. However, later they explained the results in terms of men's preference for short-term sexual strategies. The purpose of this research was to test the explanation of short-term sexual strategies. Men and women subjects were instructed to imagine themselves in a relationship which was either short-term (primarily sexual) or long-term (involving commitment) and then respond to Buss's jealousy items. It was hypothesized that, when both men and women imagined a short-term relationship, they would be more threatened by a partner's sexual infidelity, and, when they imagined a long-term relationship, they would be more threatened by a partner's emotional infidelity. Support was found for this hypothesis.

  12. Impact of long-term and short-term therapies on seminal parameters

    Directory of Open Access Journals (Sweden)

    Jlenia Elia

    2013-04-01

    Full Text Available Aim: The aim of this work was: i to evaluate the prevalence of male partners of subfertile couples being treated with long/short term therapies for non andrological diseases; ii to study their seminal profile for the possible effects of their treatments on spermatogenesis and/or epididymal maturation. Methods: The study group was made up of 723 subjects, aged between 25 and 47 years. Semen analysis was performed according to World Health Organization (WHO guidelines (1999. The Superimposed Image Analysis System (SIAS, which is based on the computerized superimposition of spermatozoa images, was used to assess sperm motility parameters. Results: The prevalence of subjects taking pharmacological treatments was 22.7% (164/723. The prevalence was 3.7% (27/723 for the Short-Term Group and 18.9% (137/723 for the Long-Term Group. The subjects of each group were also subdivided into subgroups according to the treatments being received. Regarding the seminal profile, we did not observe a significant difference between the Long-Term, Short-Term or the Control Group. However, regarding the subgroups, we found a significant decrease in sperm number and progressive motility percentage in the subjects receiving treatment with antihypertensive drugs compared with the other subgroups and the Control Group. Conclusions: In the management of infertile couples, the potential negative impact on seminal parameters of any drugs being taken as Long-Term Therapy should be considered. The pathogenic mechanism needs to be clarified.

  13. Concrete/Febex Bentonite Interaction: Results On Short-Term Column Experiments

    International Nuclear Information System (INIS)

    Escribano, A.; Turrero, M.J.; Torres, E.; Martin, P.L.

    2008-01-01

    Interaction between the alkaline pore fluids from the concrete engineered barriers and the bentonite at the repository conditions may generate products that can diffuse through the porous structure of the bentonite affecting their properties. A comprehensive study based on series of short term experiments is being performed to provide experimental evidences on the physical, chemical and mineralogical changes during the concrete-compacted bentonite interaction. Samples were analyzed by XRD, SEM-EDS and FTIR. Measurements of swelling capacity, specific surface area and chemical analysis for cation exchange capacity and soluble salts analyses were also performed. (authors)

  14. Concrete/Febex Bentonite Interaction: Results On Short-Term Column Experiments

    Energy Technology Data Exchange (ETDEWEB)

    Escribano, A.; Turrero, M.J.; Torres, E.; Martin, P.L. [CIEMAT, Environmental Department, Avda. Complutense, 22, 28040 Madrid (Spain)

    2008-07-01

    Interaction between the alkaline pore fluids from the concrete engineered barriers and the bentonite at the repository conditions may generate products that can diffuse through the porous structure of the bentonite affecting their properties. A comprehensive study based on series of short term experiments is being performed to provide experimental evidences on the physical, chemical and mineralogical changes during the concrete-compacted bentonite interaction. Samples were analyzed by XRD, SEM-EDS and FTIR. Measurements of swelling capacity, specific surface area and chemical analysis for cation exchange capacity and soluble salts analyses were also performed. (authors)

  15. Short-term flow induced crystallization in isotactic polypropylene : how short is short?

    NARCIS (Netherlands)

    Ma, Z.; Balzano, L.; Portale, G.; Peters, G.W.M.

    2013-01-01

    The so-called "short-term flow" protocol is widely applied in experimental flow-induced crystallization studies on polymers in order to separate the nucleation and subsequent growth processes [Liedauer et al. Int. Polym. Proc. 1993, 8, 236–244]. The basis of this protocol is the assumption that

  16. Folk music style modelling by recurrent neural networks with long short term memory units

    OpenAIRE

    Sturm, Bob; Santos, João Felipe; Korshunova, Iryna

    2015-01-01

    We demonstrate two generative models created by training a recurrent neural network (RNN) with three hidden layers of long short-term memory (LSTM) units. This extends past work in numerous directions, including training deeper models with nearly 24,000 high-level transcriptions of folk tunes. We discuss our on-going work.

  17. A CUSUM analysis of discharge patterns by a hydroelectric dam and discussion of potential effects on the upstream migration of American eel elvers

    International Nuclear Information System (INIS)

    Jessop, B.M.; Harvie, C.J.

    2003-01-01

    American eel elvers are among the diadromous fishes native to the Saint John River in New Brunswick that have been affected by the construction of hydroelectric dams. Before 1980, large numbers of elvers were observed entering the fishway of the Mactaquac Dam in May and June for upstream migration, but their presence abruptly ceased after 1980. A study was conducted to determine why they disappeared at the Mactaquac Dam. A cumulative sum (CUSUM) analysis was performed to determine the variability in magnitude, duration, timing, frequency, and rate of change in the daily and seasonal average level of water discharge associated with the installation of the last two of six turbines in late 1979 and early 1980. It is believed that the rapid, short-term fluctuations in water discharge which is characteristic of peaking hydroelectric dam operations, could seriously affect life cycle transitions of diadromous fishes. Upstream and downstream migration of the elvers may be affected along with their abundance, diversity and productivity. Young fish in particular are at higher risk of mortality during high flows, depending on the species. 40 refs., 3 tabs., 10 figs

  18. Comparison of Short Term with Long Term Catheterization after Anterior Colporrhaphy Surgery

    Directory of Open Access Journals (Sweden)

    F. Movahed

    2010-07-01

    Full Text Available Introduction & Objective: This belief that overfilling the bladder after anterior colporrhaphy might have a negative influence on surgical outcome, causes routine catheterization after operation. This study was done to compare short term (24h with long term (72h catheterization after anterior colporrhaphy.Materials & Methods: This randomized clinical trial was carried out at Kosar Hospital , Qazvin (Iran in 2005-2006. One hundred cases candidating for anterior colporrhaphy , were divided in two equal groups . In the first group foley catheter was removed 24 hours and in the second group 72 hours after the operation. Before removing catheter, urine sample was obtained for culture . After removal and urination, residual volume was determinded. If the volume exceeded 200 ml or retention occured, the catheter would be fixed for more 72 hours. Need for recatheterization, urinary retention, positive urine culture,and hospital stay were surveyed. The data was analyzed using T and Fisher tests.Results: Residual volume exceeding 200 ml and the need for recatheterization occurred in one case (2% in the short term group but in the long term group none of the subjects needed recatheterization (P=1. Retention was not seen. In the both groups, one case (2% had positive urine culture with no statistically significant difference (P=1. Mean hospital stay was short in the first group (P=0.00.Conclusion: Short term catheterization after anterior colporrhaphy does not cause urinary retention and decreases hospital stay.

  19. Short-term versus long-term market opportunities and financial constraints

    International Nuclear Information System (INIS)

    Ferrari, Angelo

    1999-01-01

    This presentation discusses gas developments in Europe, the European Gas Directive, short term vs. long term, and Snam's new challenges. The European gas market is characterized by (1) The role of gas in meeting the demand for energy, which varies greatly from one country to another, (2) A growing market, (3) Decreasing role of domestic production, and (4) Increasing imports. Within the European Union, the Gas Directive aims to transform single national markets into one integrated European market by introducing third party access to the network for eligible clients as a means of increasing the competition between operators. The Gas Directive would appear to modify the form of the market rather than its size, and in particular the sharing of responsibility and risk among operators. The market in the future will offer operators the possibility to exploit opportunities deriving mainly from demands for increased flexibility. Opportunities linked to entrepreneurial initiatives require long-term investments characteristic of the gas business. Risks and opportunities must be balanced evenly between different operators. If everyone takes on their own risks and responsibilities, this means a wider distribution of the risks of long-term vs. short-term, currently borne by the gas companies that are integrated, into a market that tends to favour the short-term. A gradual liberalization process should allow incumbent operators to gradually diversify their activities in new gas market areas or enter new business activities. They could move beyond their local and European boundaries in pursuit of an international dimension. The market will have to make the transition from the national to the European dimension: as an example, Snam covers 90% of the Italian market, but its share of an integrated European market will be about 15%

  20. Short-Term Group Treatment for Adult Children of Alcoholics.

    Science.gov (United States)

    Cooper, Alvin; McCormack, WIlliam A.

    1992-01-01

    Adult children of alcoholics (n=24) were tested on measures of loneliness, anxiety, hostility, depression, and interpersonal dependency before and after participation in short-term group therapy. Highly significant test score changes supported effectiveness of individual therapy in short-term groups. (Author/NB)

  1. Frequency-specific insight into short-term memory capacity

    OpenAIRE

    Feurra, Matteo; Galli, Giulia; Pavone, Enea Francesco; Rossi, Alessandro; Rossi, Simone

    2016-01-01

    We provided novel evidence of a frequency-specific effect by transcranial alternating current stimulation (tACS) of the left posterior parietal cortex on short-term memory, during a digit span task. the effect was prominent with stimulation at beta frequency for young and not for middle-aged adults and correlated with age. Our findings highlighted a short-term memory capacity improvement by tACS application.

  2. Impacts of the operation of existing hydroelectric developments on fishery resources in British Columbia

    International Nuclear Information System (INIS)

    Hirst, S.M.

    1991-01-01

    The main features of 46 hydroelectric dams and diversions in British Columbia are reviewed, and available information on the inland sport fish resources within and below the impoundments are summarized. The projects are collectively responsible for ca 95% of the electrical power used in the province. The characteristics detailed include water license and operational constraints, electrical generation, enhancement facilities, operational regime, physical and chemical environment, downstream system, sportfish populations, and recreational fishery. All the hydroelectric impoundments reviewed, with the possible exceptions of some small headponds, support sport fish populations. Recreational angling quality is considered good for about one quarter of impoundments for which information is available. Low population density is the dominant reason for poor angling quality. Drawdowns exceeding 10 m annually and/or low water retention times are significant impediments to sport fish stock densities. Recommended measures to improve sport fishery resources in and below hydroelectric impoundments include evaluation of the efficiency of ongoing compensation programs, improvement to impact assessment procedures to ensure adequate documentation of pre- and post-impoundment conditions, and enhancement of several systems through stock or nutritional supplementation. 161 refs., 95 figs., 9 tabs

  3. Reconciling long-term cultural diversity and short-term collective social behavior.

    Science.gov (United States)

    Valori, Luca; Picciolo, Francesco; Allansdottir, Agnes; Garlaschelli, Diego

    2012-01-24

    An outstanding open problem is whether collective social phenomena occurring over short timescales can systematically reduce cultural heterogeneity in the long run, and whether offline and online human interactions contribute differently to the process. Theoretical models suggest that short-term collective behavior and long-term cultural diversity are mutually excluding, since they require very different levels of social influence. The latter jointly depends on two factors: the topology of the underlying social network and the overlap between individuals in multidimensional cultural space. However, while the empirical properties of social networks are intensively studied, little is known about the large-scale organization of real societies in cultural space, so that random input specifications are necessarily used in models. Here we use a large dataset to perform a high-dimensional analysis of the scientific beliefs of thousands of Europeans. We find that interopinion correlations determine a nontrivial ultrametric hierarchy of individuals in cultural space. When empirical data are used as inputs in models, ultrametricity has strong and counterintuitive effects. On short timescales, it facilitates a symmetry-breaking phase transition triggering coordinated social behavior. On long timescales, it suppresses cultural convergence by restricting it within disjoint groups. Moreover, ultrametricity implies that these results are surprisingly robust to modifications of the dynamical rules considered. Thus the empirical distribution of individuals in cultural space appears to systematically optimize the coexistence of short-term collective behavior and long-term cultural diversity, which can be realized simultaneously for the same moderate level of mutual influence in a diverse range of online and offline settings.

  4. Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2006-01-01

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We use a method based on nonlinear programming (NLP), namely quadratic programming, to consider hydroelectric power generation a function of water discharge and of the head. The method has been applied successfully to solve a test case based on a realistic cascaded hydro system with a negligible computational time requirement and is also applied to show that the role played by reservoirs in the hydro chain do not depend only on their relative position. As a new contribution to earlier studies, which presented reservoir operation rules mainly for medium and long-term planning procedures, we show that the physical data defining hydro chain parameters used in the nonlinear model have an effect on the STHS, implying different optimal storage trajectories for the reservoirs accordingly not only with their position in the hydro chain but also with the new parameterisation defining the data for the hydro system. Moreover, considering head dependency in the hydroelectric power generation, usually neglected for hydro plants with a large storage capacity, provides a better short-term management of the conversion of the potential energy available in the reservoirs into electric energy, which represents a major advantage for the hydroelectric utilities in a competitive electricity market. (author)

  5. Short-Term Robustness of Production Management Systems : New Methodology

    NARCIS (Netherlands)

    Kleijnen, J.P.C.; Gaury, E.G.A.

    2000-01-01

    This paper investigates the short-term robustness of production planning and control systems. This robustness is defined here as the systems ability to maintain short-term service probabilities (i.e., the probability that the fill rate remains within a prespecified range), in a variety of

  6. Differences in health status between long-term and short-term benzodiazepine users.

    NARCIS (Netherlands)

    Zandstra, S.M.; Furer, J.W.; Lisdonk, E.H. van de; Bor, J.H.J.; Zitman, F.G.; Weel, C. van

    2002-01-01

    BACKGROUND: Despite generally accepted advice to keep treatment short, benzodiazepines are often prescibed for more than six months. Prevention of long-term benzodiazepine use could be facilitated by the utilisation of risk indicators for long-term use. However, the characteristics of long-term

  7. The roles of long-term phonotactic and lexical prosodic knowledge in phonological short-term memory.

    Science.gov (United States)

    Tanida, Yuki; Ueno, Taiji; Lambon Ralph, Matthew A; Saito, Satoru

    2015-04-01

    Many previous studies have explored and confirmed the influence of long-term phonological representations on phonological short-term memory. In most investigations, phonological effects have been explored with respect to phonotactic constraints or frequency. If interaction between long-term memory and phonological short-term memory is a generalized principle, then other phonological characteristics-that is, suprasegmental aspects of phonology-should also exert similar effects on phonological short-term memory. We explored this hypothesis through three immediate serial-recall experiments that manipulated Japanese nonwords with respect to lexical prosody (pitch-accent type, reflecting suprasegmental characteristics) as well as phonotactic frequency (reflecting segmental characteristics). The results showed that phonotactic frequency affected the retention not only of the phonemic sequences, but also of pitch-accent patterns, when participants were instructed to recall both the phoneme sequence and accent pattern of nonwords. In addition, accent pattern typicality influenced the retention of the accent pattern: Typical accent patterns were recalled more accurately than atypical ones. These results indicate that both long-term phonotactic and lexical prosodic knowledge contribute to phonological short-term memory performance.

  8. Visual Short-Term Memory Complexity

    DEFF Research Database (Denmark)

    Sørensen, Thomas Alrik

    Several recent studies have explored the nature and limits of visual short-term memory (VSTM) (e.g. Luck & Vogel, 1997). A general VSTM capacity limit of about 3 to 4 letters has been found, thus confirming results from earlier studies (e.g. Cattell, 1885; Sperling, 1960). However, Alvarez...

  9. Brain oscillatory substrates of visual short-term memory capacity.

    Science.gov (United States)

    Sauseng, Paul; Klimesch, Wolfgang; Heise, Kirstin F; Gruber, Walter R; Holz, Elisa; Karim, Ahmed A; Glennon, Mark; Gerloff, Christian; Birbaumer, Niels; Hummel, Friedhelm C

    2009-11-17

    The amount of information that can be stored in visual short-term memory is strictly limited to about four items. Therefore, memory capacity relies not only on the successful retention of relevant information but also on efficient suppression of distracting information, visual attention, and executive functions. However, completely separable neural signatures for these memory capacity-limiting factors remain to be identified. Because of its functional diversity, oscillatory brain activity may offer a utile solution. In the present study, we show that capacity-determining mechanisms, namely retention of relevant information and suppression of distracting information, are based on neural substrates independent of each other: the successful maintenance of relevant material in short-term memory is associated with cross-frequency phase synchronization between theta (rhythmical neural activity around 5 Hz) and gamma (> 50 Hz) oscillations at posterior parietal recording sites. On the other hand, electroencephalographic alpha activity (around 10 Hz) predicts memory capacity based on efficient suppression of irrelevant information in short-term memory. Moreover, repetitive transcranial magnetic stimulation at alpha frequency can modulate short-term memory capacity by influencing the ability to suppress distracting information. Taken together, the current study provides evidence for a double dissociation of brain oscillatory correlates of visual short-term memory capacity.

  10. SHORT-TERM MEMORY IS INDEPENDENT OF BRAIN PROTEIN SYNTHESIS

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Hasker P.; Rosenzweig, Mark R.; Jones, Oliver W.

    1980-09-01

    Male Swiss albino CD-1 mice given a single injection of a cerebral protein synthesis inhibitor, anisomycin (ANI) (1 mg/animal), 20 min prior to single trial passive avoidance training demonstrated impaired retention at tests given 3 hr, 6 hr, 1 day, and 7 days after training. Retention was not significantly different from saline controls when tests were given 0.5 or 1.5 hr after training. Prolonging inhibition of brain protein synthesis by giving either 1 or 2 additional injections of ANI 2 or 2 and 4 hr after training did not prolong short-term retention performance. The temporal development of impaired retention in ANI treated mice could not be accounted for by drug dosage, duration of protein synthesis inhibition, or nonspecific sickness at test. In contrast to the suggestion that protein synthesis inhibition prolongs short-term memory (Quinton, 1978), the results of this experiment indicate that short-term memory is not prolonged by antibiotic drugs that inhibit cerebral protein synthesis. All evidence seems consistent with the hypothesis that short-term memory is protein synthesis independent and that the establishment of long-term memory depends upon protein synthesis during or shortly after training. Evidence for a role of protein synthesis in memory maintenance is discussed.

  11. Impaired short-term memory for pitch in congenital amusia.

    Science.gov (United States)

    Tillmann, Barbara; Lévêque, Yohana; Fornoni, Lesly; Albouy, Philippe; Caclin, Anne

    2016-06-01

    Congenital amusia is a neuro-developmental disorder of music perception and production. The hypothesis is that the musical deficits arise from altered pitch processing, with impairments in pitch discrimination (i.e., pitch change detection, pitch direction discrimination and identification) and short-term memory. The present review article focuses on the deficit of short-term memory for pitch. Overall, the data discussed here suggest impairments at each level of processing in short-term memory tasks; starting with the encoding of the pitch information and the creation of the adequate memory trace, the retention of the pitch traces over time as well as the recollection and comparison of the stored information with newly incoming information. These impairments have been related to altered brain responses in a distributed fronto-temporal network, associated with decreased connectivity between these structures, as well as in abnormalities in the connectivity between the two auditory cortices. In contrast, amusic participants׳ short-term memory abilities for verbal material are preserved. These findings show that short-term memory deficits in congenital amusia are specific to pitch, suggesting a pitch-memory system that is, at least partly, separated from verbal memory. This article is part of a Special Issue entitled SI: Auditory working memory. Copyright © 2015 Elsevier B.V. All rights reserved.

  12. Hydroelectric plant turbine, stream and spillway flow measurement

    Energy Technology Data Exchange (ETDEWEB)

    Lampa, J.; Lemon, D.; Buermans, J. [ASL AQ Flow Inc., Sidney, BC (Canada)

    2004-07-01

    This presentation provided schematics of the turbine flow measurements and typical bulb installations at the Kootenay Canal and Wells hydroelectric power facilities in British Columbia. A typical arrangement for measuring stream flow using acoustic scintillation was also illustrated. Acoustic scintillation is portable, non-intrusive, suitable for short intakes, requires minimal maintenance and is cost effective and accurate. A comparison between current meters and acoustic scintillation was also presented. Stream flow measurement is valuable in evaluating downstream areas that are environmentally important for fish habitat. Stream flow measurement makes it possible to define circulation. The effects of any changes can be assessed by combining field measurements and numerical modelling. The presentation also demonstrated that computational fluid dynamics modelling appears promising in determining stream flow and turbulent flow at spillways. tabs., figs.

  13. Insensitivity of visual short-term memory to irrelevant visual information.

    Science.gov (United States)

    Andrade, Jackie; Kemps, Eva; Werniers, Yves; May, Jon; Szmalec, Arnaud

    2002-07-01

    Several authors have hypothesized that visuo-spatial working memory is functionally analogous to verbal working memory. Irrelevant background speech impairs verbal short-term memory. We investigated whether irrelevant visual information has an analogous effect on visual short-term memory, using a dynamic visual noise (DVN) technique known to disrupt visual imagery (Quinn & McConnell, 1996b). Experiment I replicated the effect of DVN on pegword imagery. Experiments 2 and 3 showed no effect of DVN on recall of static matrix patterns, despite a significant effect of a concurrent spatial tapping task. Experiment 4 showed no effect of DVN on encoding or maintenance of arrays of matrix patterns, despite testing memory by a recognition procedure to encourage visual rather than spatial processing. Serial position curves showed a one-item recency effect typical of visual short-term memory. Experiment 5 showed no effect of DVN on short-term recognition of Chinese characters, despite effects of visual similarity and a concurrent colour memory task that confirmed visual processing of the characters. We conclude that irrelevant visual noise does not impair visual short-term memory. Visual working memory may not be functionally analogous to verbal working memory, and different cognitive processes may underlie visual short-term memory and visual imagery.

  14. Environmental costs associated to the electric generation: hydroelectric versus natural gas thermoelectric; Custos ambientais associados a geracao eletrica: hidreletricas versus termeletricas a gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Reis, Marcelo de Miranda

    2001-01-15

    This works presents the methodologies for valuation of the environmental costs resulting from the main damages of the cycles of electric energy arrange through hydroelectric and natural gas thermoelectric. Initially theoretical concepts are established, embracing: the description of the valuation methodologies, the possible ways of damages internalization in the value of the products, the environmental impacts of hydroelectric and natural gas thermoelectric in these fuel cycles, and the methodologies that can be applied for value the main damages caused by the impacts. Then case studies are developed, with application of the methodologies in the hydroelectric plants of Simplicio and Serra da Mesa, and in the thermoelectric complex composed for RioGen and RioGen Merchant plants. Finally, conclusions and recommendations for a better future application in Brazil of the valuation methodologies are presented. (author)

  15. micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    the west region of Cameroon. KEYWORDS: Problems, micro hydroelectric, funds, craftsmen, Cameroon. INTRODUCTION. Energy from Water streaming down the mountains has been exploited since antiquity to replace muscular effort (Bessac, 2000). The perfection of devices used results today in hydroelectric turbines,.

  16. Environment and hydroelectricity colloquium - Synthesis; Colloque Environnement et Hydro-electricite - Synthese

    Energy Technology Data Exchange (ETDEWEB)

    Aelbrecht, Denis; Abadie, Marc; Baril, Dominique; Delacoux, Jean-Yves; Delaunay, Alexis; Loudiere, Daniel; Penalba, Anne; Pont, Didier; Rocq, Sylvie; Roult, Didier; Sheibani, Neda; Thevenet, Regis; Weisrock, Ghislain

    2010-10-15

    This document proposes a synthesis of a colloquium dedicated to the interactions between hydroelectric installations and the environment. The four sessions respectively addressed the impacts of hydroelectric installations on ecosystems and more particularly on pisciculture populations (strategies for migration restoration, development of fish-friendly turbines), the sedimentary management of hydroelectric installations, the implementation of the Water Framework European Directive (Austrian experience, biological assessment criteria), and examples of environmental integration of existing or projected installations

  17. Remembering over the short-term: the case against the standard model.

    Science.gov (United States)

    Nairne, James S

    2002-01-01

    Psychologists often assume that short-term storage is synonymous with activation, a mnemonic property that keeps information in an immediately accessible form. Permanent knowledge is activated, as a result of on-line cognitive processing, and an activity trace is established "in" short-term (or working) memory. Activation is assumed to decay spontaneously with the passage of time, so a refreshing process-rehearsal-is needed to maintain availability. Most of the phenomena of immediate retention, such as capacity limitations and word length effects, are assumed to arise from trade-offs between rehearsal and decay. This "standard model" of how we remember over the short-term still enjoys considerable popularity, although recent research questions most of its main assumptions. In this chapter I review the recent research and identify the empirical and conceptual problems that plague traditional conceptions of short-term memory. Increasingly, researchers are recognizing that short-term retention is cue driven, much like long-term memory, and that neither rehearsal nor decay is likely to explain the particulars of short-term forgetting.

  18. Gummed-up memory: chewing gum impairs short-term recall.

    Science.gov (United States)

    Kozlov, Michail D; Hughes, Robert W; Jones, Dylan M

    2012-01-01

    Several studies have suggested that short-term memory is generally improved by chewing gum. However, we report the first studies to show that chewing gum impairs short-term memory for both item order and item identity. Experiment 1 showed that chewing gum reduces serial recall of letter lists. Experiment 2 indicated that chewing does not simply disrupt vocal-articulatory planning required for order retention: Chewing equally impairs a matched task that required retention of list item identity. Experiment 3 demonstrated that manual tapping produces a similar pattern of impairment to that of chewing gum. These results clearly qualify the assertion that chewing gum improves short-term memory. They also pose a problem for short-term memory theories asserting that forgetting is based on domain-specific interference given that chewing does not interfere with verbal memory any more than tapping. It is suggested that tapping and chewing reduce the general capacity to process sequences.

  19. A Short Term Analogue Memory

    DEFF Research Database (Denmark)

    Shah, Peter Jivan

    1992-01-01

    A short term analogue memory is described. It is based on a well-known sample-hold topology in which leakage currents have been minimized partly by circuit design and partly by layout techniques. Measurements on a test chip implemented in a standard 2.4 micron analogue CMOS process show a droop...

  20. Power generation statistics

    International Nuclear Information System (INIS)

    Kangas, H.

    2001-01-01

    The frost in February increased the power demand in Finland significantly. The total power consumption in Finland during January-February 2001 was about 4% higher than a year before. In January 2001 the average temperature in Finland was only about - 4 deg C, which is nearly 2 degrees higher than in 2000 and about 6 degrees higher than long term average. Power demand in January was slightly less than 7.9 TWh, being about 0.5% less than in 2000. The power consumption in Finland during the past 12 months exceeded 79.3 TWh, which is less than 2% higher than during the previous 12 months. In February 2001 the average temperature was - 10 deg C, which was about 5 degrees lower than in February 2000. Because of this the power consumption in February 2001 increased by 5%. Power consumption in February was 7.5 TWh. The maximum hourly output of power plants in Finland was 13310 MW. Power consumption of Finnish households in February 2001 was about 10% higher than in February 2000, and in industry the increase was nearly zero. The utilization rate in forest industry in February 2001 decreased from the value of February 2000 by 5%, being only about 89%. The power consumption of the past 12 months (Feb. 2000 - Feb. 2001) was 79.6 TWh. Generation of hydroelectric power in Finland during January - February 2001 was 10% higher than a year before. The generation of hydroelectric power in Jan. - Feb. 2001 was nearly 2.7 TWh, corresponding to 17% of the power demand in Finland. The output of hydroelectric power in Finland during the past 12 months was 14.7 TWh. The increase from the previous 12 months was 17% corresponding to over 18% of the power demand in Finland. Wind power generation in Jan. - Feb. 2001 was exceeded slightly 10 GWh, while in 2000 the corresponding output was 20 GWh. The degree of utilization of Finnish nuclear power plants in Jan. - Feb. 2001 was high. The output of these plants was 3.8 TWh, being about 1% less than in Jan. - Feb. 2000. The main cause for the

  1. Hydroelectric project at Angliers : Investigation and public hearing report

    International Nuclear Information System (INIS)

    Girard, S.; Bouchard, B.

    2003-08-01

    Public hearings were held by the Bureau d'audiences publiques sur l'environnement concerning a proposed hydroelectric development project at Angliers, Quebec. The proposed hydroelectric plant is to be located at the outlet of the Des Quinze reservoir in the Temiscamingue region (northwest of the province). The site is within the municipality of Angliers, approximately 130 kilometres south of Rouyn-Noranda. The project will exploit the hydroelectric potential of the Ottawa River through a dam at Des Quinze reservoir, which is currently the property of the federal government. During the hearings, several issues were raised, and various topics examined. The political and administrative framework was reviewed, as well as the integration of the project within the community. The impacts, environmental as well as economic, were discussed. After careful examination of all the information, the Commission concluded that the hydroelectric project at Angliers was justified and acceptable from an environmental perspective. The expected economic impact on the community was an essential aspect in determining if the project was acceptable. refs., 4 figs

  2. 75 FR 4058 - CRD Hydroelectric, LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Science.gov (United States)

    2010-01-26

    ... Hydroelectric, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: CRD Hydroelectric, LLC. e. Name of Project: Red Rock Hydroelectric Project. f. Location: On the...

  3. 75 FR 71102 - White Mountain Hydroelectric Corp.; Notice of Application for Amendment of License, and...

    Science.gov (United States)

    2010-11-22

    ... Hydroelectric Corp.; Notice of Application for Amendment of License, and Soliciting Comments, Motions To Intervene, and Protests November 12, 2010. Take notice that the following hydroelectric application has been... Hydroelectric Corp. e. Name of Project: Apthorp Hydroelectric Project. f. Location: The project is located on...

  4. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  5. Environmental consequences of hydroelectric development: the role of facility size and type

    International Nuclear Information System (INIS)

    Gleick, P.H.

    1992-01-01

    The development of hydroelectric power throughout the world is receiving renewed attention as the economic, political, and environmental costs of conventional energy production rise. There is currently a perception that hydroelectricity has environmental and economic advantages over electricity produced by conventional energy technologies, but there is a paucity of information about the environmental impacts of hydroelectric facilities as a function of size and type. We characterize the environmental impacts of hydroelectric developments and quantify these impacts as a function of the size and type of project. Several unexpected conclusions arise from our analysis. For most hydroelectric facilities, size, as measured by installed capacity, is not necessarily a good indicator or the severity of environmental costs. For impacts such as land flooded and evaporative water lost, smaller facilities cause greater environmental disruptions per unit of energy produced than do larger facilities. (Author)

  6. 76 FR 62802 - Fairlawn Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-10-11

    ... Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment In accordance with the National...,000-kilowatt (kW) Jennings Randolph Hydroelectric Project located on the North Branch Potomac River in..., Washington, DC 20426. Please affix ``Jennings Randolph Hydroelectric Project No. 12715-003'' to all comments...

  7. 76 FR 46793 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-08-03

    ... Hydroelectric Limited Partnership; Notice of Availability of Environmental Assessment In accordance with the... for an original license for the 3.0-megawatt (MW) Flannagan Hydroelectric Project located on the Pound..., NE., Room 1-A, Washington, DC 20426. Please affix ``Flannagan Hydroelectric Project No. 12740-003...

  8. Small hydroelectric power plants

    International Nuclear Information System (INIS)

    Helgesen, Boerre

    2002-01-01

    Small hydroelectric power plants are power plants of 1 - 10 MW. For a supplier, this is an unnatural limit. A more natural limit involves compact engine design and simplified control system. The article discusses most of the engine and electrotechnical aspects in the development, construction and operation of such a plant

  9. Short-term wind power forecasting: probabilistic and space-time aspects

    DEFF Research Database (Denmark)

    Tastu, Julija

    work deals with the proposal and evaluation of new mathematical models and forecasting methods for short-term wind power forecasting, accounting for space-time dynamics based on geographically distributed information. Different forms of power predictions are considered, starting from traditional point...... into the corresponding models are analysed. As a final step, emphasis is placed on generating space-time trajectories: this calls for the prediction of joint multivariate predictive densities describing wind power generation at a number of distributed locations and for a number of successive lead times. In addition......Optimal integration of wind energy into power systems calls for high quality wind power predictions. State-of-the-art forecasting systems typically provide forecasts for every location individually, without taking into account information coming from the neighbouring territories. It is however...

  10. Retention interval affects visual short-term memory encoding.

    Science.gov (United States)

    Bankó, Eva M; Vidnyánszky, Zoltán

    2010-03-01

    Humans can efficiently store fine-detailed facial emotional information in visual short-term memory for several seconds. However, an unresolved question is whether the same neural mechanisms underlie high-fidelity short-term memory for emotional expressions at different retention intervals. Here we show that retention interval affects the neural processes of short-term memory encoding using a delayed facial emotion discrimination task. The early sensory P100 component of the event-related potentials (ERP) was larger in the 1-s interstimulus interval (ISI) condition than in the 6-s ISI condition, whereas the face-specific N170 component was larger in the longer ISI condition. Furthermore, the memory-related late P3b component of the ERP responses was also modulated by retention interval: it was reduced in the 1-s ISI as compared with the 6-s condition. The present findings cannot be explained based on differences in sensory processing demands or overall task difficulty because there was no difference in the stimulus information and subjects' performance between the two different ISI conditions. These results reveal that encoding processes underlying high-precision short-term memory for facial emotional expressions are modulated depending on whether information has to be stored for one or for several seconds.

  11. Comparison of Sugammadex and Neostigmine in Short Term Surgery

    Directory of Open Access Journals (Sweden)

    Fatih Koc

    2014-03-01

    Full Text Available Aim: This study compared the efficacy and cost effectivines of sugammadex and neostigmine for reversal of neuromuscular blockade induced by rocuronium for short term elective surgery. Material and Method: After written informed consent, 33 patients aged 18%u201365, ASA I-III, who were undergoing short term surgery (

  12. Short-term memory for scenes with affective content

    OpenAIRE

    Maljkovic, Vera; Martini, Paolo

    2005-01-01

    The emotional content of visual images can be parameterized along two dimensions: valence (pleasantness) and arousal (intensity of emotion). In this study we ask how these distinct emotional dimensions affect the short-term memory of human observers viewing a rapid stream of images and trying to remember their content. We show that valence and arousal modulate short-term memory as independent factors. Arousal influences dramatically the average speed of data accumulation in memory: Higher aro...

  13. Short-term solar irradiation forecasting based on Dynamic Harmonic Regression

    International Nuclear Information System (INIS)

    Trapero, Juan R.; Kourentzes, Nikolaos; Martin, A.

    2015-01-01

    Solar power generation is a crucial research area for countries that have high dependency on fossil energy sources and is gaining prominence with the current shift to renewable sources of energy. In order to integrate the electricity generated by solar energy into the grid, solar irradiation must be reasonably well forecasted, where deviations of the forecasted value from the actual measured value involve significant costs. The present paper proposes a univariate Dynamic Harmonic Regression model set up in a State Space framework for short-term (1–24 h) solar irradiation forecasting. Time series hourly aggregated as the Global Horizontal Irradiation and the Direct Normal Irradiation will be used to illustrate the proposed approach. This method provides a fast automatic identification and estimation procedure based on the frequency domain. Furthermore, the recursive algorithms applied offer adaptive predictions. The good forecasting performance is illustrated with solar irradiance measurements collected from ground-based weather stations located in Spain. The results show that the Dynamic Harmonic Regression achieves the lowest relative Root Mean Squared Error; about 30% and 47% for the Global and Direct irradiation components, respectively, for a forecast horizon of 24 h ahead. - Highlights: • Solar irradiation forecasts at short-term are required to operate solar power plants. • This paper assesses the Dynamic Harmonic Regression to forecast solar irradiation. • Models are evaluated using hourly GHI and DNI data collected in Spain. • The results show that forecasting accuracy is improved by using the model proposed

  14. LANGUAGE REPETITION AND SHORT-TERM MEMORY: AN INTEGRATIVE FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Steve eMajerus

    2013-07-01

    Full Text Available Short-term maintenance of verbal information is a core factor of language repetition, especially when reproducing multiple or unfamiliar stimuli. Many models of language processing locate the verbal short-term maintenance function in the left posterior superior temporo-parietal area and its connections with the inferior frontal gyrus. However, research in the field of short-term memory has implicated bilateral fronto-parietal networks, involved in attention and serial order processing, as being critical for the maintenance and reproduction of verbal sequences. We present here an integrative framework aimed at bridging research in the language processing and short-term memory fields. This framework considers verbal short-term maintenance as an emergent function resulting from synchronized and integrated activation in dorsal and ventral language processing networks as well as fronto-parietal attention and serial order processing networks. To-be-maintained item representations are temporarily activated in the dorsal and ventral language processing networks, novel phoneme and word serial order information is proposed to be maintained via a right fronto-parietal serial order processing network, and activation in these different networks is proposed to be coordinated and maintained via a left fronto-parietal attention processing network. This framework provides new perspectives for our understanding of information maintenance at the nonword-, word- and sentence-level as well as of verbal maintenance deficits in case of brain injury.

  15. Language repetition and short-term memory: an integrative framework.

    Science.gov (United States)

    Majerus, Steve

    2013-01-01

    Short-term maintenance of verbal information is a core factor of language repetition, especially when reproducing multiple or unfamiliar stimuli. Many models of language processing locate the verbal short-term maintenance function in the left posterior superior temporo-parietal area and its connections with the inferior frontal gyrus. However, research in the field of short-term memory has implicated bilateral fronto-parietal networks, involved in attention and serial order processing, as being critical for the maintenance and reproduction of verbal sequences. We present here an integrative framework aimed at bridging research in the language processing and short-term memory fields. This framework considers verbal short-term maintenance as an emergent function resulting from synchronized and integrated activation in dorsal and ventral language processing networks as well as fronto-parietal attention and serial order processing networks. To-be-maintained item representations are temporarily activated in the dorsal and ventral language processing networks, novel phoneme and word serial order information is proposed to be maintained via a right fronto-parietal serial order processing network, and activation in these different networks is proposed to be coordinated and maintained via a left fronto-parietal attention processing network. This framework provides new perspectives for our understanding of information maintenance at the non-word-, word- and sentence-level as well as of verbal maintenance deficits in case of brain injury.

  16. Short-horizon regulation for long-term investors

    NARCIS (Netherlands)

    Shi, Z.; Werker, B.J.M.

    2012-01-01

    We study the effects of imposing repeated short-horizon regulatory constraints on long-term investors. We show that Value-at-Risk and Expected Shortfall constraints, when imposed dynamically, lead to similar optimal portfolios and wealth distributions. We also show that, in utility terms, the costs

  17. Advanced, Environmentally Friendly Hydroelectric Turbines for the Restoration of Fish and Water Quality

    International Nuclear Information System (INIS)

    Brookshier, P.A.; Cada, G.F.; Flynn, J.V.; Rinehart, B.N.; Sale, M.J.; Sommers, G.L.

    1999-01-01

    Hydroelectric power contributes about 10 percent of the electrical energy generated in the United States, and nearly 20 percent of the worlds electrical energy. The contribution of hydroelectric generation has declined in recent years, often as a consequence of environmental concerns centering around (1) restriction of upstream and downstream fish passage by the dam, and (2) alteration of water quality and river flows by the impoundment. The Advanced Hydropower Turbine System (AHTS) Program of the U.S. Department of Energy is developing turbine technology which would help to maximize global hydropower resources while minimizing adverse environmental effects. Major technical goals for the Program are (1) the reduction of mortality among turbine-passed fish to 2 percent or less, compared to current levels ranging up to 30 percent or greater; and (2) development of aerating turbines that would ensure that water discharged from reservoirs has a dissolved oxygen concentration of at least 6 mg/L. These advanced, environmentally friendly turbines would be suitable both for new hydropower installations and for retrofitting at existing dams. Several new turbine designs that have been he AHTS program are described

  18. Applying a new computer-aided detection scheme generated imaging marker to predict short-term breast cancer risk

    Science.gov (United States)

    Mirniaharikandehei, Seyedehnafiseh; Hollingsworth, Alan B.; Patel, Bhavika; Heidari, Morteza; Liu, Hong; Zheng, Bin

    2018-05-01

    This study aims to investigate the feasibility of identifying a new quantitative imaging marker based on false-positives generated by a computer-aided detection (CAD) scheme to help predict short-term breast cancer risk. An image dataset including four view mammograms acquired from 1044 women was retrospectively assembled. All mammograms were originally interpreted as negative by radiologists. In the next subsequent mammography screening, 402 women were diagnosed with breast cancer and 642 remained negative. An existing CAD scheme was applied ‘as is’ to process each image. From CAD-generated results, four detection features including the total number of (1) initial detection seeds and (2) the final detected false-positive regions, (3) average and (4) sum of detection scores, were computed from each image. Then, by combining the features computed from two bilateral images of left and right breasts from either craniocaudal or mediolateral oblique view, two logistic regression models were trained and tested using a leave-one-case-out cross-validation method to predict the likelihood of each testing case being positive in the next subsequent screening. The new prediction model yielded the maximum prediction accuracy with an area under a ROC curve of AUC  =  0.65  ±  0.017 and the maximum adjusted odds ratio of 4.49 with a 95% confidence interval of (2.95, 6.83). The results also showed an increasing trend in the adjusted odds ratio and risk prediction scores (p  breast cancer risk.

  19. Verbal short-term memory and vocabulary learning in polyglots.

    Science.gov (United States)

    Papagno, C; Vallar, G

    1995-02-01

    Polyglot and non-polyglot Italian subjects were given tests assessing verbal (phonological) and visuo-spatial short-term and long-term memory, general intelligence, and vocabulary knowledge in their native language. Polyglots had a superior level of performance in verbal short-term memory tasks (auditory digit span and nonword repetition) and in a paired-associate learning test, which assessed the subjects' ability to acquire new (Russian) words. By contrast, the two groups had comparable performance levels in tasks assessing general intelligence, visuo-spatial short-term memory and learning, and paired-associate learning of Italian words. These findings, which are in line with neuropsychological and developmental evidence, as well as with data from normal subjects, suggest a close relationship between the capacity of phonological memory and the acquisition of foreign languages.

  20. The stimulation of hematosis on short-term and prolong irradiation

    International Nuclear Information System (INIS)

    Tukhtaev, T.M.

    1978-01-01

    This book studies the stimulation of hematosis on short-term and prolong irradiation, pathogenetic mechanisms of lesion and reconstruction of hematosis at critical radiation sickness, action hematosis stimulators in short-term irradiation conditions

  1. Rapid effects of estrogens on short-term memory: Possible mechanisms.

    Science.gov (United States)

    Paletta, Pietro; Sheppard, Paul A S; Matta, Richard; Ervin, Kelsy S J; Choleris, Elena

    2018-06-01

    Estrogens affect learning and memory through rapid and delayed mechanisms. Here we review studies on rapid effects on short-term memory. Estradiol rapidly improves social and object recognition memory, spatial memory, and social learning when administered systemically. The dorsal hippocampus mediates estrogen rapid facilitation of object, social and spatial short-term memory. The medial amygdala mediates rapid facilitation of social recognition. The three estrogen receptors, α (ERα), β (ERβ) and the G-protein coupled estrogen receptor (GPER) appear to play different roles depending on the task and brain region. Both ERα and GPER agonists rapidly facilitate short-term social and object recognition and spatial memory when administered systemically or into the dorsal hippocampus and facilitate social recognition in the medial amygdala. Conversely, only GPER can facilitate social learning after systemic treatment and an ERβ agonist only rapidly improved short-term spatial memory when given systemically or into the hippocampus, but also facilitates social recognition in the medial amygdala. Investigations into the mechanisms behind estrogens' rapid effects on short term memory showed an involvement of the extracellular signal-regulated kinase (ERK) and the phosphoinositide 3-kinase (PI3K) kinase pathways. Recent evidence also showed that estrogens interact with the neuropeptide oxytocin in rapidly facilitating social recognition. Estrogens can increase the production and/or release of oxytocin and other neurotransmitters, such as dopamine and acetylcholine. Therefore, it is possible that estrogens' rapid effects on short-term memory may occur through the regulation of various neurotransmitters, although more research is need on these interactions as well as the mechanisms of estrogens' actions on short-term memory. Copyright © 2018 Elsevier Inc. All rights reserved.

  2. Short-Term Power Plant GHG Emissions Forecasting Model

    International Nuclear Information System (INIS)

    Vidovic, D.

    2016-01-01

    In 2010, the share of greenhouse gas (GHG) emissions from power generation in the total emissions at the global level was about 25 percent. From January 1st, 2013 Croatian facilities have been involved in the European Union Emissions Trading System (EU ETS). The share of the ETS sector in total GHG emissions in Croatia in 2012 was about 30 percent, where power plants and heat generation facilities contributed to almost 50 percent. Since 2013 power plants are obliged to purchase all emission allowances. The paper describes the short-term climate forecasting model of greenhouse gas emissions from power plants while covering the daily load diagram of the system. Forecasting is done on an hourly domain typically for one day, it is possible and more days ahead. Forecasting GHG emissions in this way would enable power plant operators to purchase additional or sell surplus allowances on the market at the time. Example that describes the operation of the above mentioned forecasting model is given at the end of the paper.(author).

  3. Short-Term Planning of Hybrid Power System

    Science.gov (United States)

    Knežević, Goran; Baus, Zoran; Nikolovski, Srete

    2016-07-01

    In this paper short-term planning algorithm for hybrid power system consist of different types of cascade hydropower plants (run-of-the river, pumped storage, conventional), thermal power plants (coal-fired power plants, combined cycle gas-fired power plants) and wind farms is presented. The optimization process provides a joint bid of the hybrid system, and thus making the operation schedule of hydro and thermal power plants, the operation condition of pumped-storage hydropower plants with the aim of maximizing profits on day ahead market, according to expected hourly electricity prices, the expected local water inflow in certain hydropower plants, and the expected production of electrical energy from the wind farm, taking into account previously contracted bilateral agreement for electricity generation. Optimization process is formulated as hourly-discretized mixed integer linear optimization problem. Optimization model is applied on the case study in order to show general features of the developed model.

  4. Access to realization of small hydroelectric power station in Republic of Macedonia

    International Nuclear Information System (INIS)

    Jakimova Filipovska, Nevenka

    2001-01-01

    In the paper an overview of the small-scale hydroelectric power plants is presented. The categorization groups of small to micro hydroelectric power plants by different countries are given. Also, the evaluation models of the projects for realization the small hydroelectric power plants are analysed. The aim of the paper is to stress the advantages of the small hydro projects and their implementation in Macedonia

  5. Short-term and long-term earthquake occurrence models for Italy: ETES, ERS and LTST

    Directory of Open Access Journals (Sweden)

    Maura Murru

    2010-11-01

    Full Text Available This study describes three earthquake occurrence models as applied to the whole Italian territory, to assess the occurrence probabilities of future (M ≥5.0 earthquakes: two as short-term (24 hour models, and one as long-term (5 and 10 years. The first model for short-term forecasts is a purely stochastic epidemic type earthquake sequence (ETES model. The second short-term model is an epidemic rate-state (ERS forecast based on a model that is physically constrained by the application to the earthquake clustering of the Dieterich rate-state constitutive law. The third forecast is based on a long-term stress transfer (LTST model that considers the perturbations of earthquake probability for interacting faults by static Coulomb stress changes. These models have been submitted to the Collaboratory for the Study of Earthquake Predictability (CSEP for forecast testing for Italy (ETH-Zurich, and they were locked down to test their validity on real data in a future setting starting from August 1, 2009.

  6. The Innavik hydroelectric project

    Energy Technology Data Exchange (ETDEWEB)

    St-Pierre, S.; McNeil, E.; Gacek, J. [RSW Inc., Montreal, PQ (Canada); Atagotaaluk, E. [Pituvik Landholding Corp., Nunavik, PQ (Canada); Henderson, C. [Lumos Energy, Ottawa, ON (Canada)

    2009-07-01

    The village of Inukjuak in northern Quebec is not connected to the main electrical grid. This remote village is one of 14 Inuit communities in the Nunavik administrative region where electricity is generated by diesel thermal power plants under the direction of Hydro-Quebec Distribution's Isolated Grid subdivision. The heating of water and buildings is supplied by heavy fuel-oil. A compensation program for the price of fuel-oil is applied in the community. This presentation discussed the need for developing renewable energy sources in order to respond to the energy demands of isolated grids. The community of Inukjuak plans on developing the water resources of the Inukjuak River in order to produce hydroelectricity and reduce the use of diesel fuel. Several possible development sites were identified. The project will contribute to a reduction in energy costs while reducing greenhouse gas emissions. Revenues generated from the power plant will help the village in their economic development by enabling the completion of various community projects. The sustainable development approach taken for the project was discussed and the project's main technical, environmental and social issues were identified. The project is expected to reduce the production of an estimated 8 tons of carbon dioxide emissions by 2011 and nearly 15 tons after 10 years of operation.

  7. Presynaptic learning and memory with a persistent firing neuron and a habituating synapse: a model of short term persistent habituation.

    Science.gov (United States)

    Ramanathan, Kiruthika; Ning, Ning; Dhanasekar, Dhiviya; Li, Guoqi; Shi, Luping; Vadakkepat, Prahlad

    2012-08-01

    Our paper explores the interaction of persistent firing axonal and presynaptic processes in the generation of short term memory for habituation. We first propose a model of a sensory neuron whose axon is able to switch between passive conduction and persistent firing states, thereby triggering short term retention to the stimulus. Then we propose a model of a habituating synapse and explore all nine of the behavioral characteristics of short term habituation in a two neuron circuit. We couple the persistent firing neuron to the habituation synapse and investigate the behavior of short term retention of habituating response. Simulations show that, depending on the amount of synaptic resources, persistent firing either results in continued habituation or maintains the response, both leading to longer recovery times. The effectiveness of the model as an element in a bio-inspired memory system is discussed.

  8. Category Specific Knowledge Modulate Capacity Limitations of Visual Short-Term Memory

    DEFF Research Database (Denmark)

    Dall, Jonas Olsen; Watanabe, Katsumi; Sørensen, Thomas Alrik

    2016-01-01

    We explore whether expertise can modulate the capacity of visual short-term memory, as some seem to argue that training affects capacity of short-term memory [13] while others are not able to find this modulation [12]. We extend on a previous study [3] demonstrating expertise effects by investiga...... are in line with the theoretical interpretation that visual short-term memory reflects the sum of the reverberating feedback loops to representations in long-term memory.......We explore whether expertise can modulate the capacity of visual short-term memory, as some seem to argue that training affects capacity of short-term memory [13] while others are not able to find this modulation [12]. We extend on a previous study [3] demonstrating expertise effects......), and expert observers (Japanese university students). For both the picture and the letter condition we find no performance difference in memory capacity, however, in the critical hiragana condition we demonstrate a systematic difference relating expertise differences between the groups. These results...

  9. Monitoring marginal erosion in hydroelectric reservoirs with terrestrial mobile laser scanner

    Directory of Open Access Journals (Sweden)

    A. M. G. Tommaselli

    2014-06-01

    Full Text Available Marginal erosions in reservoirs of hydroelectric plants have caused economic and environmental problems concerning hydroelectric power generation, reduction of productive areas and devaluing land parcels. The real extension and dynamics of these erosion processes are not well known for Brazilian reservoirs. To objectively assess these problems Unesp (Univ Estadual Paulista and Duke Energy are developing a joint project which aims at the monitoring the progression of some erosive processes and understanding the causes and the dynamics of this phenomenon. Mobile LASER scanning was considered the most suitable alternative for the challenges established in the project requirements. A MDL DynaScan Mobile LASER M150 scanner was selected which uses RTK for real time positioning integrated to an IMU, enabling instantaneous generation of georeferenced point clouds. Two different reservoirs were choose for monitoring: Chavantes (storage plant and Rosana (run-of-river plant, both in the Paranapanema River, border of São Paulo and Paraná States, Brazil. The monitoring areas are scanned quarterly and analysed with base on the point cloud, meshes, contours and cross sections. Cross sections are used to visualize and compute the rate and the dynamics of erosion. Some examples and quantitative results are presented along with an analysis of the proposed technique. Some recommendations to improve the field work and latter data processing are also introduced.

  10. Widespread Forest Vertebrate Extinctions Induced by a Mega Hydroelectric Dam in Lowland Amazonia.

    Directory of Open Access Journals (Sweden)

    Maíra Benchimol

    Full Text Available Mega hydropower projects in tropical forests pose a major emergent threat to terrestrial and freshwater biodiversity worldwide. Despite the unprecedented number of existing, under-construction and planned hydroelectric dams in lowland tropical forests, long-term effects on biodiversity have yet to be evaluated. We examine how medium and large-bodied assemblages of terrestrial and arboreal vertebrates (including 35 mammal, bird and tortoise species responded to the drastic 26-year post-isolation history of archipelagic alteration in landscape structure and habitat quality in a major hydroelectric reservoir of Central Amazonia. The Balbina Hydroelectric Dam inundated 3,129 km2 of primary forests, simultaneously isolating 3,546 land-bridge islands. We conducted intensive biodiversity surveys at 37 of those islands and three adjacent continuous forests using a combination of four survey techniques, and detected strong forest habitat area effects in explaining patterns of vertebrate extinction. Beyond clear area effects, edge-mediated surface fire disturbance was the most important additional driver of species loss, particularly in islands smaller than 10 ha. Based on species-area models, we predict that only 0.7% of all islands now harbor a species-rich vertebrate assemblage consisting of ≥80% of all species. We highlight the colossal erosion in vertebrate diversity driven by a man-made dam and show that the biodiversity impacts of mega dams in lowland tropical forest regions have been severely overlooked. The geopolitical strategy to deploy many more large hydropower infrastructure projects in regions like lowland Amazonia should be urgently reassessed, and we strongly advise that long-term biodiversity impacts should be explicitly included in pre-approval environmental impact assessments.

  11. Widespread Forest Vertebrate Extinctions Induced by a Mega Hydroelectric Dam in Lowland Amazonia.

    Science.gov (United States)

    Benchimol, Maíra; Peres, Carlos A

    2015-01-01

    Mega hydropower projects in tropical forests pose a major emergent threat to terrestrial and freshwater biodiversity worldwide. Despite the unprecedented number of existing, under-construction and planned hydroelectric dams in lowland tropical forests, long-term effects on biodiversity have yet to be evaluated. We examine how medium and large-bodied assemblages of terrestrial and arboreal vertebrates (including 35 mammal, bird and tortoise species) responded to the drastic 26-year post-isolation history of archipelagic alteration in landscape structure and habitat quality in a major hydroelectric reservoir of Central Amazonia. The Balbina Hydroelectric Dam inundated 3,129 km2 of primary forests, simultaneously isolating 3,546 land-bridge islands. We conducted intensive biodiversity surveys at 37 of those islands and three adjacent continuous forests using a combination of four survey techniques, and detected strong forest habitat area effects in explaining patterns of vertebrate extinction. Beyond clear area effects, edge-mediated surface fire disturbance was the most important additional driver of species loss, particularly in islands smaller than 10 ha. Based on species-area models, we predict that only 0.7% of all islands now harbor a species-rich vertebrate assemblage consisting of ≥80% of all species. We highlight the colossal erosion in vertebrate diversity driven by a man-made dam and show that the biodiversity impacts of mega dams in lowland tropical forest regions have been severely overlooked. The geopolitical strategy to deploy many more large hydropower infrastructure projects in regions like lowland Amazonia should be urgently reassessed, and we strongly advise that long-term biodiversity impacts should be explicitly included in pre-approval environmental impact assessments.

  12. The Use of Advanced Hydroelectric Turbines to Improve Water Quality and Fish Populations

    International Nuclear Information System (INIS)

    Brookshier, P.A.; Cada, G.F.; Flynn, J.V.; Rinehart, B.N.; Sale, M.J.; Sommers, G.L.

    1999-01-01

    Hydroelectric power contributes about 10 percent of the electrical energy generated in the United States, and nearly 20 percent of the worlds electrical energy. It is a renewable energy source that can contribute significantly to reduction of greenhouse gases by offsetting conventional carbon-based electricity generation. However, rather than growing in importance, hydroelectric generation has actually declined in recent years, often as a consequence of environmental concerns centering around (1) restriction of upstream and downstream fish passage by the dam, and (2) alteration of water quality and river flows by the impoundment. The Advanced Hydropower Turbine System (AHTS) Program of the U.S. Department of Energy is developing turbine technology which would help to maximize global hydropower resources while minimizing adverse environmental effects. Major technical goals for the Program are (1) the reduction of mortality among turbine-passed fish to 2 percent or less, compared to current levels ranging up to 30 percent or greater; and (2) development of aerating turbines that would ensure that water discharged from reservoirs has a dissolved oxygen concentration of at least 6 mg/L. These advanced, environmentally friendly turbines would be suitable both for new hydropower installations and for retrofitting at existing dams. Several new turbine designs that have been developed in the initial phases of the AHTS program are described

  13. 77 FR 41980 - Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project...

    Science.gov (United States)

    2012-07-17

    ...-001-Kentucky and Indiana, Uniontown Hydroelectric Project; Newburgh Hydro, LLC, Project No. 12962-001-Kentucky and Indiana, Newburgh Hydroelectric Project; Notice of Revised Restricted Service List for a... licenses for the proposed Uniontown Hydroelectric Project and Newburgh Hydroelectric Project. The...

  14. Short-term mechanisms influencing volumetric brain dynamics

    NARCIS (Netherlands)

    Dieleman, Nikki; Koek, Huiberdina L.; Hendrikse, Jeroen

    2017-01-01

    With the use of magnetic resonance imaging (MRI) and brain analysis tools, it has become possible to measure brain volume changes up to around 0.5%. Besides long-term brain changes caused by atrophy in aging or neurodegenerative disease, short-term mechanisms that influence brain volume may exist.

  15. Short-term robustness of production management systems

    NARCIS (Netherlands)

    Kleijnen, J.P.C.; Gaury, E.G.A.

    1998-01-01

    Short-term performance of a production management system for make-to-stock factories may be quantified through the service rate per shift; long-term performance through the average monthly work in process (WIP). This may yield, for example, that WIP is minimized, while the probability of the service

  16. Potentials of short term and long term cryopreserved sperm of the ...

    African Journals Online (AJOL)

    To service the growing demand for male African giant catfish (Clarias gariepinus) broodstock for aquaculture in Nigeria, and to conserve valuable genetic resources, we improved both short-term (in deep freezer at -35°C) and long-term cryopreservation (in liquid nitrogen at -296°C) of catfish sperm. Catfish sperm ...

  17. 75 FR 38800 - Jordan Hydroelectric Limited Partnership; Notice of Application Ready for Environmental Analysis...

    Science.gov (United States)

    2010-07-06

    ... Hydroelectric Limited Partnership; Notice of Application Ready for Environmental Analysis and Soliciting... following hydroelectric application has been filed with the Commission and is available for public... 13, 2009. d. Applicant: Jordan Hydroelectric Limited Partnership. e. Name of Project: Flannagan...

  18. Visual discrimination and short-term memory for random patterns in patients with a focal cortical lesion

    NARCIS (Netherlands)

    Greenlee, MW; Koessler, M; Cornelissen, FW; Mergner, T

    1997-01-01

    Visual discrimination and short-term recognition memory for computer-generated random patterns were explored in 23 patients with a postsurgical lesion in one of the cortical hemispheres. Their results are compared with those of 23 age-matched volunteers. In a same-different forced-choice

  19. Forecasting stock return volatility: A comparison between the roles of short-term and long-term leverage effects

    Science.gov (United States)

    Pan, Zhiyuan; Liu, Li

    2018-02-01

    In this paper, we extend the GARCH-MIDAS model proposed by Engle et al. (2013) to account for the leverage effect in short-term and long-term volatility components. Our in-sample evidence suggests that both short-term and long-term negative returns can cause higher future volatility than positive returns. Out-of-sample results show that the predictive ability of GARCH-MIDAS is significantly improved after taking the leverage effect into account. The leverage effect for short-term volatility component plays more important role than the leverage effect for long-term volatility component in affecting out-of-sample forecasting performance.

  20. Optimising generators

    Energy Technology Data Exchange (ETDEWEB)

    Guerra, E.J.; Garcia, A.O.; Graffigna, F.M.; Verdu, C.A. (IMPSA (Argentina). Generators Div.)

    1994-11-01

    A new computer tool, the ARGEN program, has been developed for dimensioning large hydroelectric generators. This results in better designs, and reduces calculation time for engineers. ARGEN performs dimensional tailoring of salient pole synchronous machines in generators, synchronous condensers, and generator-motors. The operation and uses of ARGEN are explained and its advantages are listed in this article. (UK)

  1. Short Circuits of a 10 MW High Temperature Superconducting Wind Turbine Generator

    DEFF Research Database (Denmark)

    Song, Xiaowei (Andy); Liu, Dong; Polinder, Henk

    2016-01-01

    Direct drive high temperature superconducting (HTS) wind turbine generators have been proposed to tackle challenges for ever increasing wind turbine ratings. Due to smaller reactances in HTS generators, higher fault currents and larger transient torques could occur if sudden short circuits happen...... at generator terminals. In this paper, a finite element model that couples magnetic fields and the generator’s equivalent circuits is developed to simulate short circuit faults. Afterwards, the model is used to study the transient performance of a 10 MW HTS wind turbine generator under four different short...... that the short circuits pose great challenges to the generator, and careful consideration should be given to protect the generator. The results presented in this paper would be beneficial to the design, operation and protection of an HTS wind turbine generator....

  2. Auditory short-term memory activation during score reading.

    Science.gov (United States)

    Simoens, Veerle L; Tervaniemi, Mari

    2013-01-01

    Performing music on the basis of reading a score requires reading ahead of what is being played in order to anticipate the necessary actions to produce the notes. Score reading thus not only involves the decoding of a visual score and the comparison to the auditory feedback, but also short-term storage of the musical information due to the delay of the auditory feedback during reading ahead. This study investigates the mechanisms of encoding of musical information in short-term memory during such a complicated procedure. There were three parts in this study. First, professional musicians participated in an electroencephalographic (EEG) experiment to study the slow wave potentials during a time interval of short-term memory storage in a situation that requires cross-modal translation and short-term storage of visual material to be compared with delayed auditory material, as it is the case in music score reading. This delayed visual-to-auditory matching task was compared with delayed visual-visual and auditory-auditory matching tasks in terms of EEG topography and voltage amplitudes. Second, an additional behavioural experiment was performed to determine which type of distractor would be the most interfering with the score reading-like task. Third, the self-reported strategies of the participants were also analyzed. All three parts of this study point towards the same conclusion according to which during music score reading, the musician most likely first translates the visual score into an auditory cue, probably starting around 700 or 1300 ms, ready for storage and delayed comparison with the auditory feedback.

  3. Short-term and working memory impairments in aphasia.

    Science.gov (United States)

    Potagas, Constantin; Kasselimis, Dimitrios; Evdokimidis, Ioannis

    2011-08-01

    The aim of the present study is to investigate short-term memory and working memory deficits in aphasics in relation to the severity of their language impairment. Fifty-eight aphasic patients participated in this study. Based on language assessment, an aphasia score was calculated for each patient. Memory was assessed in two modalities, verbal and spatial. Mean scores for all memory tasks were lower than normal. Aphasia score was significantly correlated with performance on all memory tasks. Correlation coefficients for short-term memory and working memory were approximately of the same magnitude. According to our findings, severity of aphasia is related with both verbal and spatial memory deficits. Moreover, while aphasia score correlated with lower scores in both short-term memory and working memory tasks, the lack of substantial difference between corresponding correlation coefficients suggests a possible primary deficit in information retention rather than impairment in working memory. Copyright © 2011 Elsevier Ltd. All rights reserved.

  4. Short-Term Contract Work in Adult Education (I) and (II).

    Science.gov (United States)

    Hall, Dorothea; McMath, Patricia

    1986-01-01

    This two-part article discusses short-term project contracts for adult education staff. Part one covers implications of this trend for the service and for the staff involved. Part two looks at short-term contracts from the management viewpoint. (CH)

  5. 76 FR 76156 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Federal Power Act (FPA), proposing to study the feasibility of the Scooteney Outlet Drop Hydroelectric..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  6. 75 FR 63450 - Wilkesboro Hydroelectric Company; Notice of Application Ready for Environmental Analysis and...

    Science.gov (United States)

    2010-10-15

    ... Hydroelectric Company; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: Wilkesboro Hydroelectric Company. e. Name of Project: W. Kerr Scott Hydropower Project. f...

  7. Short-term Memory of Deep RNN

    OpenAIRE

    Gallicchio, Claudio

    2018-01-01

    The extension of deep learning towards temporal data processing is gaining an increasing research interest. In this paper we investigate the properties of state dynamics developed in successive levels of deep recurrent neural networks (RNNs) in terms of short-term memory abilities. Our results reveal interesting insights that shed light on the nature of layering as a factor of RNN design. Noticeably, higher layers in a hierarchically organized RNN architecture results to be inherently biased ...

  8. Physicochemical Characteristics of River Water Downstream of a Large Tropical Hydroelectric Dam

    Directory of Open Access Journals (Sweden)

    Teck-Yee Ling

    2016-01-01

    Full Text Available Water quality in the downstream river of a hydroelectric dam may be affected by the structural design and operation. To date, little is known about the water quality downstream of the largest dam in Malaysia, the Bakun hydroelectric dam. Therefore, the objective of the study was to determine the water quality downstream of the dam when the spillway was closed and when it was opened. Results of the study indicate that the dam plays a significant role in regulating the water quality downstream of it. When the spillway was closed, pH and oxygen were lower in the river where DO was below 5 mg/L. When the spillway was opened, the water quality improved in terms of oxygen content (>8.0 mg/L, total sulphide (TS, and chemical oxygen demand (COD but deteriorated in terms of five-day biochemical oxygen demand (BOD5, total ammonia nitrogen (TAN, and total phosphorus (TP. Additionally, the intensity of the impacts, particularly BOD5, COD, and TAN, shows a declining trend as distance from the dam increases. This study shows that impacts on the water quality extend to a distance of 32 km from the dam particularly turbidity and DO and opening the spillway changes the water quality significantly.

  9. Gut microbiome response to short-term dietary interventions in reactive hypoglycemia subjects.

    Science.gov (United States)

    Quercia, Sara; Turroni, Silvia; Fiori, Jessica; Soverini, Matteo; Rampelli, Simone; Biagi, Elena; Castagnetti, Andrea; Consolandi, Clarissa; Severgnini, Marco; Pianesi, Mario; Fallucca, Francesco; Pozzilli, Paolo; Brigidi, Patrizia; Candela, Marco

    2017-11-01

    Reactive hypoglycemia is a metabolic disorder that provokes severe hypoglycemic episodes after meals. Over recent years, the gut microbiota has been recognized as potential target for the control of metabolic diseases, and the possibility to correct gut microbiota dysbioses through diet, favouring the recovery of metabolic homeostasis, has been considered. We investigate the impact of 2 short-term (3-day) nutritional interventions, based on the macrobiotic Ma-Pi 2 diet and a control Mediterranean diet, on the structure and functionality of the gut microbiota in 12 patients affected by reactive hypoglycemia. The gut microbiota composition was characterized by next-generation sequencing of the V3 to V4 region of the 16S rRNA gene, and the ecosystem functionality was addressed by measuring the faecal concentration of short-chain fatty acids (SCFAs). In order to measure the short-term physiological gut microbiota fluctuation, the microbiomes of 7 healthy people were characterized before and after 3 days of constant diet. While no convergence of the gut microbiota compositional profiles was observed, a significant increase in SCFA faecal levels was induced only in the Ma-Pi 2 diet group, suggesting the potential of this diet to support a short-term functional convergence of the gut microbiota, regardless of the individual compositional layout. The Ma-Pi 2 diet, with its high fibre load, was effective in increasing the production of SCFAs by the gut microbiota. Because these metabolites are known for their ability to counterbalance the metabolic deregulation in persons with glucose impairment disorders, their increased bioavailability could be of some relevance in reactive hypoglycemia. Copyright © 2017 John Wiley & Sons, Ltd.

  10. Hydroelectric power is green, although controversial

    International Nuclear Information System (INIS)

    Schulp, A.

    2003-01-01

    Hydroelectric power is worldwide the most important source of renewable energy. Still, it has some controversial aspects, which are briefly discussed in this article, focusing on Belgium and the Netherlands [nl

  11. Cardioprotective Signature of Short-Term Caloric Restriction.

    Directory of Open Access Journals (Sweden)

    Hossein Noyan

    Full Text Available To understand the molecular pathways underlying the cardiac preconditioning effect of short-term caloric restriction (CR.Lifelong CR has been suggested to reduce the incidence of cardiovascular disease through a variety of mechanisms. However, prolonged adherence to a CR life-style is difficult. Here we reveal the pathways that are modulated by short-term CR, which are associated with protection of the mouse heart from ischemia.Male 10-12 wk old C57bl/6 mice were randomly assigned to an ad libitum (AL diet with free access to regular chow, or CR, receiving 30% less food for 7 days (d, prior to myocardial infarction (MI via permanent coronary ligation. At d8, the left ventricles (LV of AL and CR mice were collected for Western blot, mRNA and microRNA (miR analyses to identify cardioprotective gene expression signatures. In separate groups, infarct size, cardiac hemodynamics and protein abundance of caspase 3 was measured at d2 post-MI.This short-term model of CR was associated with cardio-protection, as evidenced by decreased infarct size (18.5±2.4% vs. 26.6±1.7%, N=10/group; P=0.01. mRNA and miR profiles pre-MI (N=5/group identified genes modulated by short-term CR to be associated with circadian clock, oxidative stress, immune function, apoptosis, metabolism, angiogenesis, cytoskeleton and extracellular matrix (ECM. Western blots pre-MI revealed CR-associated increases in phosphorylated Akt and GSK3ß, reduced levels of phosphorylated AMPK and mitochondrial related proteins PGC-1α, cytochrome C and cyclooxygenase (COX IV, with no differences in the levels of phosphorylated eNOS or MAPK (ERK1/2; p38. CR regimen was also associated with reduced protein abundance of cleaved caspase 3 in the infarcted heart and improved cardiac function.

  12. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...

  13. 77 FR 7574 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-02-13

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project Hydroelectric... study the feasibility of the P.E. Scooteney Wasteway Hydroelectric Project, to be located on the P.E...

  14. 75 FR 352 - Enloe Hydroelectric Project; Notice of Application Ready for Environmental Analysis and...

    Science.gov (United States)

    2010-01-05

    ... Hydroelectric Project; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of... Utility District No. 1 of Okanogan County. e. Name of Project: Enloe Hydroelectric Project. f. Location...

  15. The stability of the international oil trade network from short-term and long-term perspectives

    Science.gov (United States)

    Sun, Qingru; Gao, Xiangyun; Zhong, Weiqiong; Liu, Nairong

    2017-09-01

    To examine the stability of the international oil trade network and explore the influence of countries and trade relationships on the trade stability, we construct weighted and unweighted international oil trade networks based on complex network theory using oil trading data between countries from 1996 to 2014. We analyze the stability of international oil trade network (IOTN) from short-term and long-term aspects. From the short-term perspective, we find that the trade volumes play an important role on the stability. Moreover, the weighted IOTN is stable; however, the unweighted networks can better reflect the actual evolution of IOTN. From the long-term perspective, we identify trade relationships that are maintained during the whole sample period to reveal the situation of the whole international oil trade. We provide a way to quantitatively measure the stability of complex network from short-term and long-term perspectives, which can be applied to measure and analyze trade stability of other goods or services.

  16. Dissociating Measures of Consciousness from Measures of Short-Term Memory

    DEFF Research Database (Denmark)

    Sørensen, Thomas Alrik; Ásgeirsson, Árni Gunnar; Staugaard, Camilla Funch

    Often, the contents of consciousness are equated with the contents of short-term memory (or working memory), sometimes to a point where they are treated as identical entities. In the present study we aimed to investigate whether they may be modulated independently and thus dissociated from each...... if conscious content simply can be reduced to a cognitive process like short-term memory. In two experiments, we combined two different measures of short-term memory capacity to investigate how manipulations of set-size affect performance in observers with the Perceptual Awareness Scale (PAS) to measure...... conscious experience of the stimulus in every trial (Ramsøy & Overgaard, 2004; Overgaard & Sørensen, 2004). We trained observers to report their experience of a visual target stimulus on the four-point PAS scale; ranging from “no experience” to “clear experience”. To measure short-term memory we used...

  17. Applicability of short-term accelerated biofouling studies to predict long-term biofouling accumulation in reverse osmosis membrane systems

    KAUST Repository

    Sanawar, Huma

    2018-02-02

    Biofouling studies addressing biofouling control are mostly executed in short-term studies. It is unclear whether data collected from these experiments are representative for long-term biofouling as occurring in full-scale membrane systems. This study investigated whether short-term biofouling studies accelerated by biodegradable nutrient dosage to feed water were predictive for long-term biofouling development without nutrient dosage. Since the presence of a feed spacer has an strong effect on the degree of biofouling, this study employed six geometrically different feed spacers. Membrane fouling simulators (MFSs) were operated with the same (i) membrane, (ii) feed flow and (iii) feed water, but with feed spacers varying in geometry. For the short-term experiment, biofilm formation was enhanced by nutrient dosage to the MFS feed water, whereas no nutrient dosage was applied in the long-term experiment. Pressure drop development was monitored to characterize the extent of biofouling, while the accumulated viable biomass content at the end of the experimental run was quantified by adenosine triphosphate (ATP) measurements. Impact of feed spacer geometry on biofouling was compared for the short-term and long-term biofouling study. The results of the study revealed that the feed spacers exhibited the same biofouling behavior for (i) the short-term (9-d) study with nutrient dosage and (ii) the long-term (96-d) study without nutrient dosage. For the six different feed spacers, the accumulated viable biomass content (pg ATP.cm) was roughly the same, but the biofouling impact in terms of pressure drop increase in time was significantly different. The biofouling impact ranking of the six feed spacers was the same for the short-term and long-term biofouling studies. Therefore, it can be concluded that short-term accelerated biofouling studies in MFSs are a representative and suitable approach for the prediction of biofouling in membrane filtration systems after long-term

  18. Short-term fasting alters cytochrome P450-mediated drug metabolism in humans

    NARCIS (Netherlands)

    Lammers, Laureen A.; Achterbergh, Roos; de Vries, Emmely M.; van Nierop, F. Samuel; Klümpen, Heinz-Josef; Soeters, Maarten R.; Boelen, Anita; Romijn, Johannes A.; Mathôt, Ron A. A.

    2015-01-01

    Experimental studies indicate that short-term fasting alters drug metabolism. However, the effects of short-term fasting on drug metabolism in humans need further investigation. Therefore, the aim of this study was to evaluate the effects of short-term fasting (36 h) on P450-mediated drug

  19. The blue water footprint of the world's artificial reservoirs for hydroelectricity, irrigation, residential and industrial water supply, flood protection, fishing and recreation

    Science.gov (United States)

    Hogeboom, Rick J.; Knook, Luuk; Hoekstra, Arjen Y.

    2018-03-01

    For centuries, humans have resorted to building dams to gain control over freshwater available for human consumption. Although dams and their reservoirs have made many important contributions to human development, they receive negative attention as well, because of the large amounts of water they can consume through evaporation. We estimate the blue water footprint of the world's artificial reservoirs and attribute it to the purposes hydroelectricity generation, irrigation water supply, residential and industrial water supply, flood protection, fishing and recreation, based on their economic value. We estimate that economic benefits from 2235 reservoirs included in this study amount to 265 × 109 US a year, with residential and industrial water supply and hydroelectricity generation as major contributors. The water footprint associated with these benefits is the sum of the water footprint of dam construction (<1% contribution) and evaporation from the reservoir's surface area, and globally adds up to 66 × 109 m3 y-1. The largest share of this water footprint (57%) is located in non-water scarce basins and only 1% in year-round scarce basins. The primary purposes of a reservoir change with increasing water scarcity, from mainly hydroelectricity generation in non-scarce basins, to residential and industrial water supply, irrigation water supply and flood control in scarcer areas.

  20. Short-term hydro generation scheduling of Three Gorges–Gezhouba cascaded hydropower plants using hybrid MACS-ADE approach

    International Nuclear Information System (INIS)

    Mo, Li; Lu, Peng; Wang, Chao; Zhou, Jianzhong

    2013-01-01

    Highlights: • MACS and ADE algorithms are hybridized as MACS-ADE method for solving STHGS problem. • An adaptive mutation is integrated into the proposed algorithm to avoid premature convergence. • MACS and ADE are run in parallel in search of better solution. • Several effective heuristic strategies are designed for dealing with various constraints of STHGS problem. - Abstract: Short-term hydro generation scheduling (STHGS) aims at determining optimal hydro generation scheduling to obtain minimum water consumption for one day or week while meeting various system constraints. In this paper, the STHGS problem is decomposed into two sub-problems: (i) unit commitment (UC) sub-problem; (ii) economic load dispatch (ELD) sub-problem. Then, we present a hybrid algorithm based on multi ant colony system (MACS) and differential evolution (DE) for solving the STHGS problem. First, MACS is used for dealing with UC sub-problem. A set of cooperating ant colonies cooperate to choose the unit state over the scheduled time horizon. Then, the adaptive differential evolution (ADE) is used to solve ELD sub-problem. MACS and ADE are run in parallel with adjusting their solutions in search of a better solution. Meanwhile, local and global pheromone updating rules in MACS and adaptive dynamic parameter adjusting strategy in DE are applied for enhancing the search ability of MACS-ADE. Finally, the proposed method is implemented to solve STHGS problem of Three Gorges–Gezhouba cascaded hydropower plants to verify the feasibility and effectiveness. Compared with other established methods, the simulation results reveal that the proposed MACS-ADE approach has the best convergence property, computational efficiency with less water consumption

  1. Social and environmental impacts of the James Bay hydroelectric project

    International Nuclear Information System (INIS)

    Hornig, J.F.

    1999-01-01

    The book, which is an analysis and not an advocacy, examines the anatomy of the controversy that has swirled around the James Bay project - the La Grande and Great Whale projects combined - from the 1970s to the 1990s, and seeks, in the process, to determine whether there are lessons that can be learned from such an analysis that are applicable to other cases as well as to James Bay itself. The contributors are interested, at one and the same time, in finding ways to integrate the knowledge of natural scientists and social scientists to deepen the understanding of human/environment relations and to link science and policy to encourage a productive dialogue between practitioners and scholars in this increasingly important area of inquiry. The contributor's papers include the following: introduction to the issues; hydroelectric power development at James Bay: establishing a frame of reference; James Bay: environmental considerations for building large hydroelectric dams and reservoirs in Quebec; elevated mercury in fish as a result of the James Bay hydroelectric power development: perception and reality; the Cree people of James Bay: assessing the social impacts of hydroelectric dams and reservoirs; culture, social change, and Cree opposition to the James Bay hydroelectric development; and the impact of James Bay hydroelectric development on the art and craft of the James Bay Cree. The authors of the volume have attempted to stand back and examine just a few of these issues from the perspective of a variety of disciplines, and their purpose is to inform and stimulate thoughtful consideration by providing an overall perspective that might might serve to broaden the context in which specific issues can be debated. refs., 3 tabs., 5 figs

  2. 75 FR 6371 - Jordan Hydroelectric Limited Partnership; Notice of Application Accepted for Filing and...

    Science.gov (United States)

    2010-02-09

    ... Hydroelectric Limited Partnership; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests February 2, 2010. Take notice that the following hydroelectric application has been filed... License b. Project No.: P-12740-003 c. Date filed: July 13, 2009 d. Applicant: Jordan Hydroelectric...

  3. 76 FR 76153 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Hydroelectric Project (Scooteney Inlet Project or project) to be located on the Potholes East Canal, which is an..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  4. Dissociating Contents of Consciousness from Contents of Short-Term Memory

    DEFF Research Database (Denmark)

    Sørensen, Thomas Alrik; Ásgeirsson, Árni Gunnar; Staugaard, Camilla Funch

    2014-01-01

    The contents of consciousness and of short-term memory are hard to disentangle. As it seems intuitive that we represent attended objects in short-term memory and in experience, to many, it also seems intuitive to equate this content. Here we investigated memory resolution for orientation......” to a “clear experience” of a probed target. To assess memory resolution we used a Landolt-variation on the visual short-term memory (VSTM) resolution paradigm (e.g. Wilken & Ma, 2004). Set-sizes in the memory display were varied between 1, 2, or 4 elements. With increasing set-size we found that both...

  5. Some risks related to the short-term trading of natural gas

    International Nuclear Information System (INIS)

    Ahmed El Hachemi Mazighi

    2004-01-01

    Traditionally guided by long-term contracts, the international natural gas trade is experiencing new methods of operating, based on the short term and more flexibility. Today, indeed, the existence of uncommitted quantities of natural gas, combined with gas price discrepancies among different regions of the world, gives room for the expansion of the spot-trading of gas. The main objective of this paper is to discuss three fundamental risks related to the short-term trading of natural gas: volume risk, price risk and infrastructure risk. The defenders Of globalisation argue that the transition from the long-term to the short-term trading of natural gas is mainly a question of access to gas reserves, decreasing costs of gas liquefaction, the building of liquefied natural gas (LNG) fleets and regasification facilities and third-party access to the infrastructure. This process needs to be as short as possible, so that the risks related to the transition process will disappear rapidly. On the other hand, the detractors of globalisation put the emphasis on the complexity of the gas value chain and on the fact that eliminating long- term contracts increases the risks inherent to the international natural gas business. In this paper, we try to untangle and assess the risks related to the short-term trading of natural gas. Our main conclusions are: the short-term trading of gas is far from riskless; volume risk requires stock-building in both consuming and producing countries. (author)

  6. Holding multiple items in short term memory: a neural mechanism.

    Directory of Open Access Journals (Sweden)

    Edmund T Rolls

    Full Text Available Human short term memory has a capacity of several items maintained simultaneously. We show how the number of short term memory representations that an attractor network modeling a cortical local network can simultaneously maintain active is increased by using synaptic facilitation of the type found in the prefrontal cortex. We have been able to maintain 9 short term memories active simultaneously in integrate-and-fire simulations where the proportion of neurons in each population, the sparseness, is 0.1, and have confirmed the stability of such a system with mean field analyses. Without synaptic facilitation the system can maintain many fewer memories active in the same network. The system operates because of the effectively increased synaptic strengths formed by the synaptic facilitation just for those pools to which the cue is applied, and then maintenance of this synaptic facilitation in just those pools when the cue is removed by the continuing neuronal firing in those pools. The findings have implications for understanding how several items can be maintained simultaneously in short term memory, how this may be relevant to the implementation of language in the brain, and suggest new approaches to understanding and treating the decline in short term memory that can occur with normal aging.

  7. Holding multiple items in short term memory: a neural mechanism.

    Science.gov (United States)

    Rolls, Edmund T; Dempere-Marco, Laura; Deco, Gustavo

    2013-01-01

    Human short term memory has a capacity of several items maintained simultaneously. We show how the number of short term memory representations that an attractor network modeling a cortical local network can simultaneously maintain active is increased by using synaptic facilitation of the type found in the prefrontal cortex. We have been able to maintain 9 short term memories active simultaneously in integrate-and-fire simulations where the proportion of neurons in each population, the sparseness, is 0.1, and have confirmed the stability of such a system with mean field analyses. Without synaptic facilitation the system can maintain many fewer memories active in the same network. The system operates because of the effectively increased synaptic strengths formed by the synaptic facilitation just for those pools to which the cue is applied, and then maintenance of this synaptic facilitation in just those pools when the cue is removed by the continuing neuronal firing in those pools. The findings have implications for understanding how several items can be maintained simultaneously in short term memory, how this may be relevant to the implementation of language in the brain, and suggest new approaches to understanding and treating the decline in short term memory that can occur with normal aging.

  8. Holding Multiple Items in Short Term Memory: A Neural Mechanism

    Science.gov (United States)

    Rolls, Edmund T.; Dempere-Marco, Laura; Deco, Gustavo

    2013-01-01

    Human short term memory has a capacity of several items maintained simultaneously. We show how the number of short term memory representations that an attractor network modeling a cortical local network can simultaneously maintain active is increased by using synaptic facilitation of the type found in the prefrontal cortex. We have been able to maintain 9 short term memories active simultaneously in integrate-and-fire simulations where the proportion of neurons in each population, the sparseness, is 0.1, and have confirmed the stability of such a system with mean field analyses. Without synaptic facilitation the system can maintain many fewer memories active in the same network. The system operates because of the effectively increased synaptic strengths formed by the synaptic facilitation just for those pools to which the cue is applied, and then maintenance of this synaptic facilitation in just those pools when the cue is removed by the continuing neuronal firing in those pools. The findings have implications for understanding how several items can be maintained simultaneously in short term memory, how this may be relevant to the implementation of language in the brain, and suggest new approaches to understanding and treating the decline in short term memory that can occur with normal aging. PMID:23613789

  9. Evaluation methodology for flood damage reduction by preliminary water release from hydroelectric dams

    Science.gov (United States)

    Ando, T.; Kawasaki, A.; Koike, T.

    2017-12-01

    IPCC AR5 (2014) reported that rainfall in the middle latitudes of the Northern Hemisphere has been increasing since 1901, and it is claimed that warmer climate will increase the risk of floods. In contrast, world water demand is forecasted to exceed a sustainable supply by 40 percent by 2030. In order to avoid this expectable water shortage, securing new water resources has become an utmost challenge. However, flood risk prevention and the secure of water resources are contradictory. To solve this problem, we can use existing hydroelectric dams not only as energy resources but also for flood control. However, in case of Japan, hydroelectric dams take no responsibility for it, and benefits have not been discussed accrued by controlling flood by hydroelectric dams, namely by using preliminary water release from them. Therefore, our paper proposes methodology for assessing those benefits. This methodology has three stages as shown in Fig. 1. First, RRI model is used to model flood events, taking account of the probability of rainfall. Second, flood damage is calculated using assets in inundation areas multiplied by the inundation depths generated by that RRI model. Third, the losses stemming from preliminary water release are calculated, and adding them to flood damage, overall losses are calculated. We can evaluate the benefits by changing the volume of preliminary release. As a result, shown in Fig. 2, the use of hydroelectric dams to control flooding creates 20 billion Yen benefits, in the probability of three-day-ahead rainfall prediction of the assumed maximum rainfall in Oi River, in the Shizuoka Pref. of Japan. As the third priority in the Sendai Framework for Disaster Risk Reduction 2015-2030, `investing in disaster risk reduction for resilience - public and private investment in disaster risk prevention and reduction through structural and non-structural measures' was adopted. The accuracy of rainfall prediction is the key factor in maximizing the benefits

  10. Qualitative similarities in the visual short-term memory of pigeons and people.

    Science.gov (United States)

    Gibson, Brett; Wasserman, Edward; Luck, Steven J

    2011-10-01

    Visual short-term memory plays a key role in guiding behavior, and individual differences in visual short-term memory capacity are strongly predictive of higher cognitive abilities. To provide a broader evolutionary context for understanding this memory system, we directly compared the behavior of pigeons and humans on a change detection task. Although pigeons had a lower storage capacity and a higher lapse rate than humans, both species stored multiple items in short-term memory and conformed to the same basic performance model. Thus, despite their very different evolutionary histories and neural architectures, pigeons and humans have functionally similar visual short-term memory systems, suggesting that the functional properties of visual short-term memory are subject to similar selective pressures across these distant species.

  11. Short-term hydropower production planning by stochastic programming

    DEFF Research Database (Denmark)

    Fleten, Stein-Erik; Kristoffersen, Trine

    2008-01-01

    -term production planning a matter of spatial distribution among the reservoirs of the plant. Day-ahead market prices and reservoir inflows are, however, uncertain beyond the current operation day and water must be allocated among the reservoirs in order to strike a balance between current profits and expected......Within the framework of multi-stage mixed-integer linear stochastic programming we develop a short-term production plan for a price-taking hydropower plant operating under uncertainty. Current production must comply with the day-ahead commitments of the previous day which makes short...

  12. Short-term variability of CYG X-1

    International Nuclear Information System (INIS)

    Oda, M.; Doi, K.; Ogawara, Y.; Takagishi, K.; Wada, M.

    1975-01-01

    The short-term X-ray variability distinguishes Cyg X-1, which is the most likely candidate of the black hole, from other X-ray sources. Present status of our knowledge on this short-term variation mainly from the Uhuru, the MIT and the GSFC observations is reviewed. The nature of impulsive variations which compose the time variation exceeding the statistical fluctuation is discussed. There are indications that the energy spectrum of large pulses is harder than the average spectrum or the large pulses are the characteristics of the hard component of the spectrum if it is composed of two, soft and hard, components. Features of the variations may be partly simulated by the superposition of random short-noise pulses with a fraction of a second duration. However, the autocorrelation analysis and the dynamic spectrum analysis indicate that the correlation lasts for several seconds and in the variation buried are some regularities which exhibit power concentrations in several frequency bands; 0.2 -- 0.3, 0.4 -- 0.5, 0.8, 1.2 -- 1.5 Hz. There are several possible interpretation of these results in terms of: e.g. a) a mixture of short-noise pulses with two or more constant durations, b) the shape of the basic shot-noise pulse, c) bunching of the pulses, d) superposition of wave-packets or temporal oscillations. But we have not yet reached any definite understandings in the nature of the variabilities. The sub-structure of the fluctuations on a time scale of milli-second suggested by two investigations is also discussed. (auth.)

  13. Some risks related to the short-term trading of natural gas

    International Nuclear Information System (INIS)

    Mazighi, Ahmed El Hachemi

    2004-01-01

    Traditionally guided by long-term contracts, the international natural gas trade is experiencing new methods of operating, based on the short term and more flexibility. Today, indeed, the existence of uncommitted quantities of natural gas, combined with gas price discrepancies among different regions of the world, gives room for the expansion of the spot-trading of gas. The main objective of this paper is to discuss three fundamental risks related to the short-term trading of natural gas: volume risk, price risk and infrastructure risk. The defenders of globalisation argue that the transition from the long-term to the short-term trading of natural gas is mainly a question of access to gas reserves, decreasing costs of gas liquefaction, the building of liquefied natural gas (LNG) fleets and regasification facilities and third-party access to the infrastructure. This process needs to be as short as possible, so that the risks related to the transition process will disappear rapidly. On the other hand, the detractors of globalisation put the emphasis on the complexity of the gas value chain and on the fact that eliminating long-term contracts increases the risks inherent to the international natural gas business. In this paper, we try to untangle and assess the risks related to the short-term trading of natural gas. Our main conclusions are: the short-term trading of gas is far from riskless; volume risk requires stock-building in both consuming and producing countries; price risk, through the high volatility for gas, induces an increase in options prices; there is no evidence to suggest that money-lenders' appetite for financing gas infrastructure projects will continue in a short-term trading system. This would be a threat to consumers' security of supply. (Author)

  14. 77 FR 7143 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-02-10

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project Hydroelectric... study the feasibility of the P.E. 46A Wasteway Hydroelectric Project, to be located on the P.E. 46A...

  15. A novel inclusion of intermittent generation resources in long term energy auctions

    International Nuclear Information System (INIS)

    Marambio, Rodrigo; Rudnick, Hugh

    2017-01-01

    Long term energy auctions are positioning as a valuable tool in order to attract new investments into power systems, especially in Latin American countries where emergent economies characteristics and their correspondent risks are usually present. Even though the focus of these auctions is the long term, there are short term issues involved which actual auction designs fail to include, resulting in an energy allocation that is not necessarily optimal for the system, a condition which becomes more evident in the presence of intermittent renewable technologies. A novel mechanism is formulated to obtain the optimal allocation in long term energy auctions, considering short term generation profiles from both intermittent and conventional base load technologies, and also their risk aversions. The proposed mechanism is developed and simulations are made for some scenarios in the Chilean power market, with different levels of renewable penetration. Significant cost savings are achieved for the final consumers in relation to energy purchases, in comparison with a mechanism that follows the demand profile. As more renewable intermittent capacity enters the power system it is evident the need for changes in the energy auctions allocation mechanisms, including elements to exploit the synergies among participants in the short term. - Highlights: • Risk management consideration in technology neutral auctions allocation. • Allocation mechanism in technology neutral auctions with intermittent technologies. • Renewable and conventional technologies energy auction offer curves. • Increase bid prices in auctions as a consequence of solar technology support.

  16. Short-term energy outlook, October 1998. Quarterly projections, 1998 4. quarter

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    The Energy Information Administration (EIA) prepares The Short-Term Energy Outlook (energy supply, demand, and price projections) monthly for distribution on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. In addition, printed versions of the report are available to subscribers in January, April, July and October. The forecast period for this issue of the Outlook extends from October 1998 through December 1999. Values for third quarter of 1998 data, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the October 1998 version of the Short-term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

  17. Short-term Mobility and Increased Partnership Concurrency among Men in Zimbabwe.

    Directory of Open Access Journals (Sweden)

    Susan Cassels

    Full Text Available Migration has long been understood as an underlying factor for HIV transmission, and sexual partner concurrency has been increasingly studied as an important component of HIV transmission dynamics. However, less work has examined the role of short-term mobility in sexual partner concurrency using a network approach. Short-term mobility may be a risk for HIV for the migrant's partner as well either through the partner's risk behaviors while the migrant is away, such as the partner having additional partners, or via exposure to the return migrant.Using data from the 2010-11 Zimbabwe Demographic and Health Survey, weighted generalized linear regression models were used to investigate the associations between short-term mobility and partnership concurrency at the individual and partnership levels.At the individual level, we find strong evidence of an association between short-term mobility and concurrency. Men who traveled were more likely to have concurrent partnerships compared to men who did not travel and the relationship was non-linear: each trip was associated with a 2% higher probability of concurrency, with a diminishing risk at 60 trips (p<0.001. At the partnership level, short-term mobility by the male only or both partners was associated with male concurrency. Couples in which the female only traveled exhibited less male concurrency.Short-term mobility has the ability to impact population-level transmission dynamics by facilitating partnership concurrency and thus onward HIV transmission. Short-term migrants may be an important population to target for HIV testing, treatment, or social and behavioral interventions to prevent the spread of HIV.

  18. Short-term and long-term effects of violent media on aggression in children and adults.

    Science.gov (United States)

    Bushman, Brad J; Huesmann, L Rowell

    2006-04-01

    To test whether the results of the accumulated studies on media violence and aggressive behavior are consistent with the theories that have evolved to explain the effects. We tested for the existence of both short-term and long-term effects for aggressive behavior. We also tested the theory-driven hypothesis that short-term effects should be greater for adults and long-term effects should be greater for children. Meta-analysis. Children younger than 18 years and adults. Violent media, including TV, movies, video games, music, and comic books. Measures of aggressive behavior, aggressive thoughts, angry feelings, physiological arousal (eg, heart rate, blood pressure), and helping behavior. Effect size estimates were combined using meta-analytic procedures. As expected, the short-term effects of violent media were greater for adults than for children whereas the long-term effects were greater for children than for adults. The results also showed that there were overall modest but significant effect sizes for exposure to media violence on aggressive behaviors, aggressive thoughts, angry feelings, arousal levels, and helping behavior. The results are consistent with the theory that short-term effects are mostly due to the priming of existing well-encoded scripts, schemas, or beliefs, which adults have had more time to encode. In contrast, long-term effects require the learning (encoding) of scripts, schemas, or beliefs. Children can encode new scripts, schemas, and beliefs via observational learning with less interference and effort than adults.

  19. Electric generator overhaul of the Ing. Carlos Ramirez Ulloa hydroelectric. Central project conclusions; Rehabilitacion de los generadores de la central hidroelectrica Ing. Carlos Ramirez Ulloa. Conclusiones del proyecto

    Energy Technology Data Exchange (ETDEWEB)

    Campuzano Martinez, Ignacio Roberto; Gonzalez Vazquez, Alejandro Esteban; Robles Pimentel, Edgar Guillermo; Esparza Saucedo, Marcos; Garcia Martinez, Javier; Sanchez Flores, Ernesto; Martinez Romero, Jose Luis [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1999-12-31

    The Hydroelectric Ing. Carlos Ramirez Ulloa Power Central has three 200 MW electric generators. The Central initiated its commercial operation in 1985. The electric generators had design problems that were properly corrected in an overhaul program that was initiated in 1996, with Unit 2 electric generator and completed in 1998 with Unit 1 electric generator. This paper presents the relevant aspects of the experience accumulated in the project. [Espanol] La central hidroelectrica Ing. Carlos Ramirez Ulloa cuenta con tres generadores de 200 MW cada uno. La central inicio su operacion comercial en 1985. Los generadores tenian problemas de diseno que fueron debidamente corregidos en un programa de rehabilitacion que inicio en 1996, con el generador de la unidad 2, y culmino en 1998 con el generador de la unidad 1. En este articulo se presentan los aspectos relevantes de la experiencia acumulada en el proyecto.

  20. Electric generator overhaul of the Ing. Carlos Ramirez Ulloa hydroelectric. Central project conclusions; Rehabilitacion de los generadores de la central hidroelectrica Ing. Carlos Ramirez Ulloa. Conclusiones del proyecto

    Energy Technology Data Exchange (ETDEWEB)

    Campuzano Martinez, Ignacio Roberto; Gonzalez Vazquez, Alejandro Esteban; Robles Pimentel, Edgar Guillermo; Esparza Saucedo, Marcos; Garcia Martinez, Javier; Sanchez Flores, Ernesto; Martinez Romero, Jose Luis [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    The Hydroelectric Ing. Carlos Ramirez Ulloa Power Central has three 200 MW electric generators. The Central initiated its commercial operation in 1985. The electric generators had design problems that were properly corrected in an overhaul program that was initiated in 1996, with Unit 2 electric generator and completed in 1998 with Unit 1 electric generator. This paper presents the relevant aspects of the experience accumulated in the project. [Espanol] La central hidroelectrica Ing. Carlos Ramirez Ulloa cuenta con tres generadores de 200 MW cada uno. La central inicio su operacion comercial en 1985. Los generadores tenian problemas de diseno que fueron debidamente corregidos en un programa de rehabilitacion que inicio en 1996, con el generador de la unidad 2, y culmino en 1998 con el generador de la unidad 1. En este articulo se presentan los aspectos relevantes de la experiencia acumulada en el proyecto.

  1. Questioning short-term memory and its measurement: Why digit span measures long-term associative learning.

    Science.gov (United States)

    Jones, Gary; Macken, Bill

    2015-11-01

    Traditional accounts of verbal short-term memory explain differences in performance for different types of verbal material by reference to inherent characteristics of the verbal items making up memory sequences. The role of previous experience with sequences of different types is ostensibly controlled for either by deliberate exclusion or by presenting multiple trials constructed from different random permutations. We cast doubt on this general approach in a detailed analysis of the basis for the robust finding that short-term memory for digit sequences is superior to that for other sequences of verbal material. Specifically, we show across four experiments that this advantage is not due to inherent characteristics of digits as verbal items, nor are individual digits within sequences better remembered than other types of individual verbal items. Rather, the advantage for digit sequences stems from the increased frequency, compared to other verbal material, with which digits appear in random sequences in natural language, and furthermore, relatively frequent digit sequences support better short-term serial recall than less frequent ones. We also provide corpus-based computational support for the argument that performance in a short-term memory setting is a function of basic associative learning processes operating on the linguistic experience of the rememberer. The experimental and computational results raise questions not only about the role played by measurement of digit span in cognition generally, but also about the way in which long-term memory processes impact on short-term memory functioning. Copyright © 2015 The Authors. Published by Elsevier B.V. All rights reserved.

  2. Short term wind speed forecasting in La Venta, Oaxaca, Mexico, using artificial neural networks

    Energy Technology Data Exchange (ETDEWEB)

    Cadenas, Erasmo [Facultad de Ingenieria Mecanica, Universidad Michoacana de San Nicolas de Hidalgo, Santiago Tapia No. 403, Centro, 5000, Mor., Mich. (Mexico); Rivera, Wilfrido [Centro de Ivestigacion en Energia, Universidad Nacional Autonoma de Mexico, Apartado Postal 34, Temixco 62580, Morelos (Mexico)

    2009-01-15

    In this paper the short term wind speed forecasting in the region of La Venta, Oaxaca, Mexico, applying the technique of artificial neural network (ANN) to the hourly time series representative of the site is presented. The data were collected by the Comision Federal de Electricidad (CFE) during 7 years through a network of measurement stations located in the place of interest. Diverse configurations of ANN were generated and compared through error measures, guaranteeing the performance and accuracy of the chosen models. First a model with three layers and seven neurons was chosen, according to the recommendations of diverse authors, nevertheless, the results were not sufficiently satisfactory so other three models were developed, consisting of three layers and six neurons, two layers and four neurons and two layers and three neurons. The simplest model of two layers, with two input neurons and one output neuron, was the best for the short term wind speed forecasting, with mean squared error and mean absolute error values of 0.0016 and 0.0399, respectively. The developed model for short term wind speed forecasting showed a very good accuracy to be used by the Electric Utility Control Centre in Oaxaca for the energy supply. (author)

  3. Ordered Short-Term Memory Differs in Signers and Speakers: Implications for Models of Short-Term Memory

    Science.gov (United States)

    Bavelier, Daphne; Newport, Elissa L.; Hall, Matt; Supalla, Ted; Boutla, Mrim

    2008-01-01

    Capacity limits in linguistic short-term memory (STM) are typically measured with forward span tasks in which participants are asked to recall lists of words in the order presented. Using such tasks, native signers of American Sign Language (ASL) exhibit smaller spans than native speakers ([Boutla, M., Supalla, T., Newport, E. L., & Bavelier, D.…

  4. Pigeon visual short-term memory directly compared to primates.

    Science.gov (United States)

    Wright, Anthony A; Elmore, L Caitlin

    2016-02-01

    Three pigeons were trained to remember arrays of 2-6 colored squares and detect which of two squares had changed color to test their visual short-term memory. Procedures (e.g., stimuli, displays, viewing times, delays) were similar to those used to test monkeys and humans. Following extensive training, pigeons performed slightly better than similarly trained monkeys, but both animal species were considerably less accurate than humans with the same array sizes (2, 4 and 6 items). Pigeons and monkeys showed calculated memory capacities of one item or less, whereas humans showed a memory capacity of 2.5 items. Despite the differences in calculated memory capacities, the pigeons' memory results, like those from monkeys and humans, were all well characterized by an inverse power-law function fit to d' values for the five display sizes. This characterization provides a simple, straightforward summary of the fundamental processing of visual short-term memory (how visual short-term memory declines with memory load) that emphasizes species similarities based upon similar functional relationships. By closely matching pigeon testing parameters to those of monkeys and humans, these similar functional relationships suggest similar underlying processes of visual short-term memory in pigeons, monkeys and humans. Copyright © 2015 Elsevier B.V. All rights reserved.

  5. Auditory-Cortex Short-Term Plasticity Induced by Selective Attention

    Science.gov (United States)

    Jääskeläinen, Iiro P.; Ahveninen, Jyrki

    2014-01-01

    The ability to concentrate on relevant sounds in the acoustic environment is crucial for everyday function and communication. Converging lines of evidence suggests that transient functional changes in auditory-cortex neurons, “short-term plasticity”, might explain this fundamental function. Under conditions of strongly focused attention, enhanced processing of attended sounds can take place at very early latencies (~50 ms from sound onset) in primary auditory cortex and possibly even at earlier latencies in subcortical structures. More robust selective-attention short-term plasticity is manifested as modulation of responses peaking at ~100 ms from sound onset in functionally specialized nonprimary auditory-cortical areas by way of stimulus-specific reshaping of neuronal receptive fields that supports filtering of selectively attended sound features from task-irrelevant ones. Such effects have been shown to take effect in ~seconds following shifting of attentional focus. There are findings suggesting that the reshaping of neuronal receptive fields is even stronger at longer auditory-cortex response latencies (~300 ms from sound onset). These longer-latency short-term plasticity effects seem to build up more gradually, within tens of seconds after shifting the focus of attention. Importantly, some of the auditory-cortical short-term plasticity effects observed during selective attention predict enhancements in behaviorally measured sound discrimination performance. PMID:24551458

  6. Short-Term Effects of Midseason Coach Turnover on Team Performance in Soccer

    Science.gov (United States)

    Balduck, Anne-Line; Buelens, Marc; Philippaerts, Renaat

    2010-01-01

    The present study addressed the issue of short-term performance effects of midseason coach turnover in soccer. The goal of this study was to examine this effect on subsequent short-term team performance. The purposes of this study were to (a) examine whether midseason coach turnover improved results in the short term, and (b) examine how team…

  7. Use of mediation to resolve the dispute over low-head hydroelectric development at Swan Lake

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, D.

    1980-08-01

    In 1978, the Maine Hydroelectric Development Corporation announced that the company planned to renovate five dams on the Goose River near Belfast, Maine to generate electricity. The most important part of the plan involved the use of the first of the dams, at the lower end of Swan Lake, to regulate the flow of water to the downstream dams. For Maine Hydro, management of the Swan Lake dam could make an otherwise marginal proposal lucrative. However, Swan Lake is vitally important to the residents of Swanville. The town was so concerned about the impact of this proposed hydroelectric project that it petitioned the Federal Energy Regulatory Commission (FERC) to deny Maine Hydro's application on the grounds that it would damage the environment, reduce property values and eliminate recreational opportunities for its citizens. This report was written by the mediator of the dispute and represents the views and behavior of the parties as the mediator understood them. It is intended to present the mediator's observations in a way which will inform and assist others who may someday face a difficult situation like the one the Town of Swanville and Maine Hydroelectric Development Corporation faced, and successfully resolved, in the spring and summer of 1979.

  8. Short-term Forecasting Tools for Agricultural Nutrient Management.

    Science.gov (United States)

    Easton, Zachary M; Kleinman, Peter J A; Buda, Anthony R; Goering, Dustin; Emberston, Nichole; Reed, Seann; Drohan, Patrick J; Walter, M Todd; Guinan, Pat; Lory, John A; Sommerlot, Andrew R; Sharpley, Andrew

    2017-11-01

    The advent of real-time, short-term farm management tools is motivated by the need to protect water quality above and beyond the general guidance offered by existing nutrient management plans. Advances in high-performance computing and hydrologic or climate modeling have enabled rapid dissemination of real-time information that can assist landowners and conservation personnel with short-term management planning. This paper reviews short-term decision support tools for agriculture that are under various stages of development and implementation in the United States: (i) Wisconsin's Runoff Risk Advisory Forecast (RRAF) System, (ii) New York's Hydrologically Sensitive Area Prediction Tool, (iii) Virginia's Saturated Area Forecast Model, (iv) Pennsylvania's Fertilizer Forecaster, (v) Washington's Application Risk Management (ARM) System, and (vi) Missouri's Design Storm Notification System. Although these decision support tools differ in their underlying model structure, the resolution at which they are applied, and the hydroclimates to which they are relevant, all provide forecasts (range 24-120 h) of runoff risk or soil moisture saturation derived from National Weather Service Forecast models. Although this review highlights the need for further development of robust and well-supported short-term nutrient management tools, their potential for adoption and ultimate utility requires an understanding of the appropriate context of application, the strategic and operational needs of managers, access to weather forecasts, scales of application (e.g., regional vs. field level), data requirements, and outreach communication structure. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.

  9. Pumped hydroelectric storage utilization assessment: Forerunner of renewable energy integration or Trojan horse?

    OpenAIRE

    KOUGIAS IOANNIS; SZABO SANDOR

    2017-01-01

    Pumped hydroelectric storage (PHS) is the main utility-scale storage technology. Although PHS systems generally constitute a fraction of generation, they receive increasing attention due to their potential balancing role towards higher penetration of variable renewable energy sources (RES). In the European context it is widely believed that PHS are key elements of the ongoing energy transition. The present analysis examines if this assumption is valid and PHS utilization grows parallel to RES...

  10. Analysing the Possible Ways for Short-Term Forcing Gas Turbine Engines in Auxiliary Power Unit

    Directory of Open Access Journals (Sweden)

    N. I. Trotskii

    2016-01-01

    applied only to small-sized and auxiliary gas turbines, operating as part of gas turbine power plants in vehicles, which comprise additional compressed air cylinders. Here are calculation results as a function of the engine power and forcing time on the amount of additional compressed air fed into the combustion chamber. The article shows that in feeding the additional compressed air in the amount of 15% of the airflow the engine power in the compressor is increased by 27%. It also describes the main implementation difficulties of this method.In conclusion, the article presents data on the considered methods for short-term forcing the GTE and shows the main difficulties in their implementation. It also comes to conclusion that the electro-generator design strength and characteristics restrict the limits of these short-term forcing methods.

  11. An Artificial Neural Network Based Short-term Dynamic Prediction of Algae Bloom

    Directory of Open Access Journals (Sweden)

    Yao Junyang

    2014-06-01

    Full Text Available This paper proposes a method of short-term prediction of algae bloom based on artificial neural network. Firstly, principal component analysis is applied to water environmental factors in algae bloom raceway ponds to get main factors that influence the formation of algae blooms. Then, a model of short-term dynamic prediction based on neural network is built with the current chlorophyll_a values as input and the chlorophyll_a values in the next moment as output to realize short-term dynamic prediction of algae bloom. Simulation results show that the model can realize short-term prediction of algae bloom effectively.

  12. DYNAMICS OF THE ANXIETY DISORDERS IN THE COURSE OF SHORT-TERM PSYCHOTHERAPY

    Directory of Open Access Journals (Sweden)

    T.N. Hmylova

    2008-06-01

    Full Text Available The tendency of psychotherapy modern concepts referring to the short-term forms having been taken into account, we carried out the research aimed at the study of short-term form personality-oriented psychotherapy effect on the anxiety disorder dynamics. 103 patients with neurotic disorders were examined in the neurosis and psychotherapy department of the Bekhterev Psychoneurological Research Institute. The findings revealed the situational and personal anxiety level to be objectively decreased in the short-term group psychotherapy course. The short-term group psychotherapy was proved to bean effective method in anxiety disorders treatment considering indications and limitations.

  13. An ethics curriculum for short-term global health trainees

    OpenAIRE

    DeCamp, Matthew; Rodriguez, Joce; Hecht, Shelby; Barry, Michele; Sugarman, Jeremy

    2013-01-01

    Background Interest in short-term global health training and service programs continues to grow, yet they can be associated with a variety of ethical issues for which trainees or others with limited global health experience may not be prepared to address. Therefore, there is a clear need for educational interventions concerning these ethical issues. Methods We developed and evaluated an introductory curriculum, ?Ethical Challenges in Short-term Global Health Training.? The curriculum was deve...

  14. Narcissism and the Strategic Pursuit of Short-Term Mating

    DEFF Research Database (Denmark)

    Schmitt, David P.; Alcalay, Lidia; Allik, Jüri

    2017-01-01

    Previous studies have documented links between sub-clinical narcissism and the active pursuit of short-term mating strategies (e.g., unrestricted sociosexuality, marital infidelity, mate poaching). Nearly all of these investigations have relied solely on samples from Western cultures. In the curr...... limitations of these cross-culturally universal findings and presents suggestions for future research into revealing the precise psychological features of narcissism that facilitate the strategic pursuit of short-term mating....

  15. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  16. 76 FR 75543 - Castle Creek Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... (FPA), proposing to study the feasibility of the Castle Creek Hydroelectric Project to be located on... be located adjacent to the original hydroelectric plant, with a single shaft Pelton turbine...

  17. Cash Management and Short-Term Investments for Colleges and Universities.

    Science.gov (United States)

    Haag, Leonard H.

    Effective cash management and short-term investing are discussed in this "how to" guide designed to benefit most institutions of higher education. The following premises are examined: proper compensation for effective cash management is not an expense but an investment; effective cash management and short-term investment programs do not depend on…

  18. Conversion of short-term to long-term memory in the novel object recognition paradigm.

    Science.gov (United States)

    Moore, Shannon J; Deshpande, Kaivalya; Stinnett, Gwen S; Seasholtz, Audrey F; Murphy, Geoffrey G

    2013-10-01

    It is well-known that stress can significantly impact learning; however, whether this effect facilitates or impairs the resultant memory depends on the characteristics of the stressor. Investigation of these dynamics can be confounded by the role of the stressor in motivating performance in a task. Positing a cohesive model of the effect of stress on learning and memory necessitates elucidating the consequences of stressful stimuli independently from task-specific functions. Therefore, the goal of this study was to examine the effect of manipulating a task-independent stressor (elevated light level) on short-term and long-term memory in the novel object recognition paradigm. Short-term memory was elicited in both low light and high light conditions, but long-term memory specifically required high light conditions during the acquisition phase (familiarization trial) and was independent of the light level during retrieval (test trial). Additionally, long-term memory appeared to be independent of stress-mediated glucocorticoid release, as both low and high light produced similar levels of plasma corticosterone, which further did not correlate with subsequent memory performance. Finally, both short-term and long-term memory showed no savings between repeated experiments suggesting that this novel object recognition paradigm may be useful for longitudinal studies, particularly when investigating treatments to stabilize or enhance weak memories in neurodegenerative diseases or during age-related cognitive decline. Copyright © 2013 Elsevier Inc. All rights reserved.

  19. Short Circuits of a 10-MW High-Temperature Superconducting Wind Turbine Generator

    DEFF Research Database (Denmark)

    Song, Xiaowei (Andy); Liu, Dong; Polinder, Henk

    2017-01-01

    Direct Drive high-temperature superconducting (HTS) wind turbine generators have been proposed to tackle challenges for ever increasing wind turbine ratings. Due to smaller reactances in HTS generators, higher fault currents and larger transient torques could occur if sudden short circuits take...... place at generator terminals. In this paper, a finite element model that couples magnetic fields and the generator's equivalent circuits is developed to simulate short-circuit faults. Afterward, the model is used to study the transient performance of a 10-MW HTS wind turbine generator under four...... show that the short circuits pose great challenges to the generator, and careful consideration should be given to protect the generator. The findings presented in this paper would be beneficial to the design, operation and protection of an HTS wind turbine generator....

  20. Hydroelectricity and territories; L'hydroelectricite et les territoires

    Energy Technology Data Exchange (ETDEWEB)

    Rocq, Sylvie [Syndicat Mixte d' Etude et d' Amenagement de la Garonne, 61, rue Pierre Cazeneuve 31200 Toulouse (France); Moor, Jean-Francois; Comeau, Aline [Agence de l' eau Adour-Garonne, 90 rue de Feretra 31078 Toulouse Cedex 4 (France); Thomas, Michael [Etablissement Public Territorial du Bassin de la Dordogne - Epidor, Le Tournepique, 24250 Castelnaud-la-Chapelle (France)

    2012-01-15

    On our river territories, the development of renewable energy and the restoration of the quality of the aquatic ecosystems both illustrate the need to reconcile the different usages of water resources while still guaranteeing proper functioning of the ecosystems. Hydroelectricity is the crux of the problem. Because of its mountainous hydrographic network and its favourable hydrology, the Adour-Garonne basin witnessed large-scale development of its hydroelectric potential throughout the 20. century. Approaching the question of hydroelectricity from the point of view of the river territories puts all the challenges facing them into their true perspective. Two distinct examples in the Adour-Garonne basin illustrate the partnership between the Water Agency and the local authorities in the Garonne and Dordogne basins: on the Garonne River, reconciling water usages with the maintenance of adequate water levels at times of drought; on the Dordogne River, reducing the impact of the hydro-peaking. (authors)

  1. Short-term and long-term plasticity interaction in human primary motor cortex.

    Science.gov (United States)

    Iezzi, Ennio; Suppa, Antonio; Conte, Antonella; Li Voti, Pietro; Bologna, Matteo; Berardelli, Alfredo

    2011-05-01

    Repetitive transcranial magnetic stimulation (rTMS) over primary motor cortex (M1) elicits changes in motor evoked potential (MEP) size thought to reflect short- and long-term forms of synaptic plasticity, resembling short-term potentiation (STP) and long-term potentiation/depression (LTP/LTD) observed in animal experiments. We designed this study in healthy humans to investigate whether STP as elicited by 5-Hz rTMS interferes with LTP/LTD-like plasticity induced by intermittent and continuous theta-burst stimulation (iTBS and cTBS). The effects induced by 5-Hz rTMS and iTBS/cTBS were indexed as changes in MEP size. We separately evaluated changes induced by 5-Hz rTMS, iTBS and cTBS applied alone and those induced by iTBS and cTBS delivered after priming 5-Hz rTMS. Interactions between 5-Hz rTMS and iTBS/cTBS were investigated under several experimental conditions by delivering 5-Hz rTMS at suprathreshold and subthreshold intensity, allowing 1 and 5 min intervals to elapse between 5-Hz rTMS and TBS, and delivering one and ten 5-Hz rTMS trains. We also investigated whether 5-Hz rTMS induces changes in intracortical excitability tested with paired-pulse transcranial magnetic stimulation. When given alone, 5-Hz rTMS induced short-lasting and iTBS/cTBS induced long-lasting changes in MEP amplitudes. When M1 was primed with 10 suprathreshold 5-Hz rTMS trains at 1 min before iTBS or cTBS, the iTBS/cTBS-induced after-effects disappeared. The 5-Hz rTMS left intracortical excitability unchanged. We suggest that STP elicited by suprathreshold 5-Hz rTMS abolishes iTBS/cTBS-induced LTP/LTD-like plasticity through non-homeostatic metaplasticity mechanisms. Our study provides new information on interactions between short-term and long-term rTMS-induced plasticity in human M1. © 2011 The Authors. European Journal of Neuroscience © 2011 Federation of European Neuroscience Societies and Blackwell Publishing Ltd.

  2. Couple disagreement about short-term fertility desires in Austria: Effects on intentions and contraceptive behaviour

    Directory of Open Access Journals (Sweden)

    Maria Rita Testa

    2012-02-01

    Full Text Available BACKGROUND Because of the dyadic nature of reproduction, the couple is the most suitable context forstudying reproductive decision-making. OBJECTIVE I investigate the effects of couple disagreement about short-term childbearing desires on the formulation and implementation of fertility intentions. Do men and women incorporate the perception of a disagreement with the partner about wanting a(nother child now in their reports on short-term fertility intentions and contraceptive behaviour? Are there relevant differences by type of disagreement, parity, gender and gender equality within the couple? METHODS Using individual-level data from the Austrian Generation and Gender Survey conductedin 2008, I regress respondent's short-term fertility intentions (ordinal regression modelsand non-use of contraception (logistic regression model on couple's short-term childbearing desires and a set of background variables. RESULTS The findings show that disagreement is shifted toward a pregnancy intentionpregnancy-seeking behaviour at parity zero and toward avoiding pregnancy and maintainingcontraceptive use at higher parities. Childless women are less responsive to the perceptionof their partner's desires than childless men when they express their short-termchildbearing intentions. Neither women nor men are likely to stop contraception if they perceive a disagreement with their partner about wanting a(nother child. Moreover, if theman is actively involved in childcare duties the chance to resolve the couple conflict in favour of childbearing increases. CONCLUSIONS This paper calls for the collection of data from both members of each couple so that theanalysis of the partner's actual desires can complement the analysis of the partner's perceived desires.

  3. Short-term plasticity as a neural mechanism supporting memory and attentional functions.

    Science.gov (United States)

    Jääskeläinen, Iiro P; Ahveninen, Jyrki; Andermann, Mark L; Belliveau, John W; Raij, Tommi; Sams, Mikko

    2011-11-08

    Based on behavioral studies, several relatively distinct perceptual and cognitive functions have been defined in cognitive psychology such as sensory memory, short-term memory, and selective attention. Here, we review evidence suggesting that some of these functions may be supported by shared underlying neuronal mechanisms. Specifically, we present, based on an integrative review of the literature, a hypothetical model wherein short-term plasticity, in the form of transient center-excitatory and surround-inhibitory modulations, constitutes a generic processing principle that supports sensory memory, short-term memory, involuntary attention, selective attention, and perceptual learning. In our model, the size and complexity of receptive fields/level of abstraction of neural representations, as well as the length of temporal receptive windows, increases as one steps up the cortical hierarchy. Consequently, the type of input (bottom-up vs. top down) and the level of cortical hierarchy that the inputs target, determine whether short-term plasticity supports purely sensory vs. semantic short-term memory or attentional functions. Furthermore, we suggest that rather than discrete memory systems, there are continuums of memory representations from short-lived sensory ones to more abstract longer-duration representations, such as those tapped by behavioral studies of short-term memory. Copyright © 2011 Elsevier B.V. All rights reserved.

  4. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Science.gov (United States)

    2010-04-16

    ... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...

  5. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In accordance with the National Environmental Policy... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...

  6. 76 FR 57729 - Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final...

    Science.gov (United States)

    2011-09-16

    ...-015] Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final Environmental Impact Statement for the Relicensing of the Boundary Hydroelectric Project and the Surrender of... reviewed the applications for license for the Boundary Hydroelectric Project (FERC No. 2144-38), and the...

  7. Short- and long-term reproducibility of radioisotopic examination of gastric emptying

    Energy Technology Data Exchange (ETDEWEB)

    Jonderko, K. (Silesian School of Medicine, Katowice (Poland). Dept. of Gastroenterology)

    1990-01-01

    Reproducibility of gastric emptying (GE) of a radiolabelled solid meal was assessed. The short-term reproducibility was evaluated on the basis of 12 paired GE examinations performed 1-3 days apart. Twelve paired GE examinations taken 3-8 months apart enabled long-term reproducibility assessment. Reproducibility of GE parameters was expressed in terms of the coefficient of variation, CV. No significant between-day variation of solid GE was found either regarding the short-term or the long-term reproducibility. Although slightly higher CV values characterized the long-term reproducibility of the GE parameters considered, the variations of the differences between repeated GE examinations did not differ significantly between short- and long-term GE reproducibility. The results obtained justify the use of radioisotopic GE measurement for the assessment of early and late results of pharmacologic or surgical management. (author).

  8. Short-term and long-term effects of GDP on traffic deaths in 18 OECD countries, 1960-2011.

    Science.gov (United States)

    Dadgar, Iman; Norström, Thor

    2017-02-01

    Research suggests that increases in gross domestic product (GDP) lead to increases in traffic deaths plausibly due to the increased road traffic induced by an expanding economy. However, there also seems to exist a long-term effect of economic growth that is manifested in improved traffic safety and reduced rates of traffic deaths. Previous studies focus on either the short-term, procyclical effect, or the long-term, protective effect. The aim of the present study is to estimate the short-term and long-term effects jointly in order to assess the net impact of GDP on traffic mortality. We extracted traffic death rates for the period 1960-2011 from the WHO Mortality Database for 18 OECD countries. Data on GDP/capita were obtained from the Maddison Project. We performed error correction modelling to estimate the short-term and long-term effects of GDP on the traffic death rates. The estimates from the error correction modelling for the entire study period suggested that a one-unit increase (US$1000) in GDP/capita yields an instantaneous short-term increase in the traffic death rate by 0.58 (pGDP leads to an immediate increase in traffic deaths. However, after the mid-1970s this short-term effect is more than outweighed by a markedly stronger protective long-term effect, whereas the reverse is true for the period before the mid-1970s. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  9. Atmospheric emissions : hydro-electricity versus other options

    International Nuclear Information System (INIS)

    Chamberland, A.; Belanger, C.; Gagnon, L.

    1996-01-01

    One of the great environmental advantage offered by hydro-electricity in northern or temperate climates includes reduced atmospheric emissions. While natural gas plants, from an environmental viewpoint, are thought to be the best fossil fuel option, they emit 18 times more greenhouse gases, at least 60 times more sulfur dioxide and hundreds of times more nitrogen oxides than do hydro-electric systems. The relative SO 2 and greenhouse gas emissions from energy systems in Canada were outlined, and their environmental impacts were described. At the same time, mention was made of other environmental pollutants, such as acid rain, photochemical smog, and particulates that continue to have major impacts on the environment, but were displaced as the focus of attention by greenhouse gases. A study was conducted to determine the effects of extreme biomass decomposition and greenhouse gas emissions from reservoirs. The study showed that at depths of more than 10 centimeters below water surface, organic matter does not contribute to greenhouse gas production, even at 20 degrees C. It was demonstrated that even when maximum biomass decomposition is assumed, a modern natural gas plant would emit 14 times more green house gases than a hydroelectric plant of comparable capacity. 13 refs., 4 tabs., 3 figs

  10. Short-term uranium price formation: a methodology

    International Nuclear Information System (INIS)

    Hsieh, L.Y.; de Graffenried, C.L.

    1987-01-01

    One of the major problems in analyzing the short-term uranium market is the lack of a well-defined spot market price. The two primary sources of price data covering the US uranium market are the series published by the US Dept. of Energy (DOE) and by the Nuclear Exchange Corporation (NUEXCO), a private brokerage firm. Because of the differences in both definition and coverage, these two series are not directly comparable. In this study, an econometric model was developed for analyzing the interrelationship between short-term uranium price (NUEXCO exchange value), supply, demand, and future price expectations formed by market participants. The validity of this model has been demonstrated by the fact that all simulation statistics derived are highly significant. Three forecasting scenarios were developed in this study

  11. Persistent long-term facilitation at an identified synapse becomes labile with activation of short-term heterosynaptic plasticity.

    Science.gov (United States)

    Hu, Jiang-Yuan; Schacher, Samuel

    2014-04-02

    Short-term and long-term synaptic plasticity are cellular correlates of learning and memory of different durations. Little is known, however, how these two forms of plasticity interact at the same synaptic connection. We examined the reciprocal impact of short-term heterosynaptic or homosynaptic plasticity at sensorimotor synapses of Aplysia in cell culture when expressing persistent long-term facilitation (P-LTF) evoked by serotonin [5-hydroxytryptamine (5-HT)]. Short-term heterosynaptic plasticity induced by 5-HT (facilitation) or the neuropeptide FMRFa (depression) and short-term homosynaptic plasticity induced by tetanus [post-tetanic potentiation (PTP)] or low-frequency stimulation [homosynaptic depression (HSD)] of the sensory neuron were expressed in both control synapses and synapses expressing P-LTF in the absence or presence of protein synthesis inhibitors. All forms of short-term plasticity failed to significantly affect ongoing P-LTF in the absence of protein synthesis inhibitors. However, P-LTF reversed to control levels when either 5-HT or FMRFa was applied in the presence of rapamycin. In contrast, P-LTF was unaffected when either PTP or HSD was evoked in the presence of either rapamycin or anisomycin. These results indicate that synapses expressing persistent plasticity acquire a "new" baseline and functionally express short-term changes as naive synapses, but the new baseline becomes labile following selective activations-heterosynaptic stimuli that evoke opposite forms of plasticity-such that when presented in the presence of protein synthesis inhibitors produce a rapid reversal of the persistent plasticity. Activity-selective induction of a labile state at synapses expressing persistent plasticity may facilitate the development of therapies for reversing inappropriate memories.

  12. Behavioural Models of Motor Control and Short-Term Memory

    OpenAIRE

    Imanaka, Kuniyasu; Funase, Kozo; Yamauchi, Masaki

    1995-01-01

    We examined in this review article the behavioural and conceptual models of motor control and short-term memory which have intensively been investigated since the 1970s. First, we reviewed both the dual-storage model of short-term memory in which movement information is stored and a typical model of motor control which emphasizes the importance of efferent factors. We then examined two models of preselection effects: a cognitive model and a cognitive/ efferent model. Following this we reviewe...

  13. Gummed-up memory: Chewing gum impairs short-term recall

    OpenAIRE

    Kozlov, Michail D; Hughes, Robert W; Jones, Dylan M

    2012-01-01

    Several studies have suggested that short-term memory is generally improved by chewing gum. However, we report the first studies to show that chewing gum impairs short-term memory for both item order and item identity. Experiment 1 showed that chewing gum reduces serial recall of letter lists. Experiment 2 indicated that chewing does not simply disrupt vocal-articulatory planning required for order retention: Chewing equally impairs a matched task that required retention of list item identity...

  14. [Short-term memory characteristics of vibration intensity tactile perception on human wrist].

    Science.gov (United States)

    Hao, Fei; Chen, Li-Juan; Lu, Wei; Song, Ai-Guo

    2014-12-25

    In this study, a recall experiment and a recognition experiment were designed to assess the human wrist's short-term memory characteristics of tactile perception on vibration intensity, by using a novel homemade vibrotactile display device based on the spatiotemporal combination vibration of multiple micro vibration motors as a test device. Based on the obtained experimental data, the short-term memory span, recognition accuracy and reaction time of vibration intensity were analyzed. From the experimental results, some important conclusions can be made: (1) The average short-term memory span of tactile perception on vibration intensity is 3 ± 1 items; (2) The greater difference between two adjacent discrete intensities of vibrotactile stimulation is defined, the better average short-term memory span human wrist gets; (3) There is an obvious difference of the average short-term memory span on vibration intensity between the male and female; (4) The mechanism of information extraction in short-term memory of vibrotactile display is to traverse the scanning process by comparison; (5) The recognition accuracy and reaction time performance of vibrotactile display compares unfavourably with that of visual and auditory. The results from this study are important for designing vibrotactile display coding scheme.

  15. 76 FR 72196 - CRD Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for...

    Science.gov (United States)

    2011-11-22

    ... Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On October 14, 2011, CRD Hydroelectric LLC (transferor) and... Red Rock Hydroelectric Project, No. 12576, located on the Des Monies River in Marion County, Iowa...

  16. 78 FR 48670 - Rivermill Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-08-09

    ... Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption August 5, 2013. 1. By letter filed July 19, 2013, Rivermill Hydroelectric, Inc. and New Hampshire Hydro Associates informed the... Project, FERC No. 9403. All correspondence should be forwarded to Rivermill Hydroelectric, Inc., c/o Essex...

  17. Hydroelectric power and privatisation

    International Nuclear Information System (INIS)

    Frankovic, B.

    2000-01-01

    The paper considers privatisation aspects of both the existing hydroelectric power plants presently owned by the Croatian state and those to be built in the future. The paper highlights the water power utilisation as just one of the possible purposes of water and land resources development, which are the most important segment of the physical development of the Croatian territory, and the fact that water and land are public wealth. (author)

  18. Developing a Local Neurofuzzy Model for Short-Term Wind Power Forecasting

    Directory of Open Access Journals (Sweden)

    E. Faghihnia

    2014-01-01

    Full Text Available Large scale integration of wind generation capacity into power systems introduces operational challenges due to wind power uncertainty and variability. Therefore, accurate wind power forecast is important for reliable and economic operation of the power systems. Complexities and nonlinearities exhibited by wind power time series necessitate use of elaborative and sophisticated approaches for wind power forecasting. In this paper, a local neurofuzzy (LNF approach, trained by the polynomial model tree (POLYMOT learning algorithm, is proposed for short-term wind power forecasting. The LNF approach is constructed based on the contribution of local polynomial models which can efficiently model wind power generation. Data from Sotavento wind farm in Spain was used to validate the proposed LNF approach. Comparison between performance of the proposed approach and several recently published approaches illustrates capability of the LNF model for accurate wind power forecasting.

  19. Pro short-term procurement - Broker/trader

    International Nuclear Information System (INIS)

    Hoellen, E.E.

    1990-01-01

    The author presents his opinion on the issue of short-term versus long-term procurement of uranium and enrichment and the impact on reliability of supply. The progression of the market has been one of increasing commoditization. Utility buyers have moved towards purchasing uranium on the spot market and linking long-term contracts to spot-market pricing. There is some logic to the argument that utilities and the industry in general would be best served by this approach. Inventories would be worked off much more quickly, and unnecessary supply would be shut off until prices recovered to profitable levels. The result would be a healthier market with no detriment to the reliability of supply

  20. Short-term memory in the service of executive control functions

    Directory of Open Access Journals (Sweden)

    Farshad Alizadeh Mansouri

    2015-12-01

    Full Text Available Short-term memory is a crucial cognitive function for supporting on-going and upcoming behaviours, allowing storage of information across delay periods. The content of this memory may typically include tangible information about features such as the shape, colour or texture of an object, its location and motion relative to the body, or phonological information. The neural correlate of these short-term memories has been found in different brain areas involved in organizing perceptual or motor functions. In particular, neuronal activity in different prefrontal areas encodes task-related information corresponding to short-term memory across delay periods, and lesions in the prefrontal cortex severely affect the ability to hold this type of memory. Recent studies have further expanded the scope and possible role of short-term memory by showing that information of abstract entities such as a behaviour-guiding rule, or the occurrence of a conflict in information processing; can also be maintained in short-term memory and used for adjusting the allocation of executive control in dynamic environments. It has also been shown that neuronal activity in the dorsolateral prefrontal and orbitofrontal cortices encodes information about such abstract entities. These findings suggest that the prefrontal cortex plays crucial roles in organizing goal-directed behaviour by supporting various mnemonic processes that maintain a wide range of information in the service of executive control of on-going or upcoming behaviour.

  1. Implicit short- and long-term memory direct our gaze in visual search.

    Science.gov (United States)

    Kruijne, Wouter; Meeter, Martijn

    2016-04-01

    Visual attention is strongly affected by the past: both by recent experience and by long-term regularities in the environment that are encoded in and retrieved from memory. In visual search, intertrial repetition of targets causes speeded response times (short-term priming). Similarly, targets that are presented more often than others may facilitate search, even long after it is no longer present (long-term priming). In this study, we investigate whether such short-term priming and long-term priming depend on dissociable mechanisms. By recording eye movements while participants searched for one of two conjunction targets, we explored at what stages of visual search different forms of priming manifest. We found both long- and short- term priming effects. Long-term priming persisted long after the bias was present, and was again found even in participants who were unaware of a color bias. Short- and long-term priming affected the same stage of the task; both biased eye movements towards targets with the primed color, already starting with the first eye movement. Neither form of priming affected the response phase of a trial, but response repetition did. The results strongly suggest that both long- and short-term memory can implicitly modulate feedforward visual processing.

  2. Stacking Ensemble Learning for Short-Term Electricity Consumption Forecasting

    Directory of Open Access Journals (Sweden)

    Federico Divina

    2018-04-01

    Full Text Available The ability to predict short-term electric energy demand would provide several benefits, both at the economic and environmental level. For example, it would allow for an efficient use of resources in order to face the actual demand, reducing the costs associated to the production as well as the emission of CO 2 . To this aim, in this paper we propose a strategy based on ensemble learning in order to tackle the short-term load forecasting problem. In particular, our approach is based on a stacking ensemble learning scheme, where the predictions produced by three base learning methods are used by a top level method in order to produce final predictions. We tested the proposed scheme on a dataset reporting the energy consumption in Spain over more than nine years. The obtained experimental results show that an approach for short-term electricity consumption forecasting based on ensemble learning can help in combining predictions produced by weaker learning methods in order to obtain superior results. In particular, the system produces a lower error with respect to the existing state-of-the art techniques used on the same dataset. More importantly, this case study has shown that using an ensemble scheme can achieve very accurate predictions, and thus that it is a suitable approach for addressing the short-term load forecasting problem.

  3. Hydroelectricity, an opportunity to grab?

    International Nuclear Information System (INIS)

    Yergeau, M.

    1997-01-01

    The deregulation within the electricity sector and the government''s project approval process were discussed. Deregulation was meant to simplify trade while providing consumers with a fair price, quality service and end-product quality. Proposals for large hydroelectric projects, however, must still be authorized by the government. The environmental assessment process for projects involving energy transmission infrastructures is long and complicated. All of Hydro-Quebec''s recent large projects were challenged in court. While energy market players need environmentally credible generating schemes, there appears to be nothing on the horizon to suggest that the approval process is going to be made easier soon. Indeed, there is every reason to believe that recent gains in environmental and social protection will not be sold off to ease the burden on utility companies to prove their case before construction. The choice is between speed and quality in matters of authorization, and while every effort should be made to combine the two, when it comes down to a choice, there should be no question as to what must be preserved. 2 figs

  4. Identity modulates short-term memory for facial emotion.

    Science.gov (United States)

    Galster, Murray; Kahana, Michael J; Wilson, Hugh R; Sekuler, Robert

    2009-12-01

    For some time, the relationship between processing of facial expression and facial identity has been in dispute. Using realistic synthetic faces, we reexamined this relationship for both perception and short-term memory. In Experiment 1, subjects tried to identify whether the emotional expression on a probe stimulus face matched the emotional expression on either of two remembered faces that they had just seen. The results showed that identity strongly influenced recognition short-term memory for emotional expression. In Experiment 2, subjects' similarity/dissimilarity judgments were transformed by multidimensional scaling (MDS) into a 2-D description of the faces' perceptual representations. Distances among stimuli in the MDS representation, which showed a strong linkage of emotional expression and facial identity, were good predictors of correct and false recognitions obtained previously in Experiment 1. The convergence of the results from Experiments 1 and 2 suggests that the overall structure and configuration of faces' perceptual representations may parallel their representation in short-term memory and that facial identity modulates the representation of facial emotion, both in perception and in memory. The stimuli from this study may be downloaded from http://cabn.psychonomic-journals.org/content/supplemental.

  5. Feasibility study on the demonstrative test on the hybrid mini hydroelectric power generation technology. 2; Hybrid gata mini suiryoku hatsuden gijutsu ni kakawaru jissho shiken kanosei chosa. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    A study was made for the purpose of electrification of unelectrified zones of the mountainous areas in developing countries using extremely small hydroelectric power facilities. The target for this project is a development of a micro hydroelectric power system with a size of about 5kW, which is estimated regarding that 1 village has 80 houses and each house needs electricity of 60W. In the study, the low-head system using a weir of irrigation channels in Subang pref. of West Java state was selected by the evaluation of access, stability of flow rate, natural conditions, etc. The hydroelectric power plant is of a flow-in method in which water is taken from the left bank and is injected/discharged to the downstream of the left bank. As the hybrid complementary power source, hybrid battery with a two-hour charging time at peak and a capacity of 3.5kWh was considered. When estimating the construction cost of the hybrid micro hydroelectric power system and equalizing by durable years, the operational cost per kW is 15 times higher than the benefits which local people receive. It was judged to be difficult to say that the micro hydroelectric power system is economically feasible. It was predicted that the financial profit during the demonstrative test is good, according to a trial calculation of income from power rates and the operational cost. 18 refs., 90 figs., 53 tabs.

  6. [Impacts of hydroelectric cascade exploitation on river ecosystem and landscape: a review].

    Science.gov (United States)

    Yang, Kun; Deng, Xi; Li, Xue-Ling; Wen, Ping

    2011-05-01

    Hydroelectric cascade exploitation, one of the major ways for exploiting water resources and developing hydropower, not only satisfies the needs of various national economic sectors, but also promotes the socio-economic sustainable development of river basin. unavoidable anthropogenic impacts on the entire basin ecosystem. Based on the process of hydroelectric cascade exploitation and the ecological characteristics of river basins, this paper reviewed the major impacts of hydroelectric cascade exploitation on dam-area ecosystems, river reservoirs micro-climate, riparian ecosystems, river aquatic ecosystems, wetlands, and river landscapes. Some prospects for future research were offered, e.g., strengthening the research of chain reactions and cumulative effects of ecological factors affected by hydroelectric cascade exploitation, intensifying the study of positive and negative ecological effects under the dam networks and their joint operations, and improving the research of successional development and stability of basin ecosystems at different temporal and spatial scales.

  7. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  8. How long-term dynamics of sediment subduction controls short-term dynamics of seismicity

    Science.gov (United States)

    Brizzi, S.; van Zelst, I.; van Dinther, Y.; Funiciello, F.; Corbi, F.

    2017-12-01

    Most of the world's greatest earthquakes occur along the subduction megathrust. Weak and porous sediments have been suggested to homogenize the plate interface and thereby promote lateral rupture propagation and great earthquakes. However, the importance of sediment thickness, let alone their physical role, is not yet unequivocally established. Based on a multivariate statistical analysis of a global database of 62 subduction segments, we confirm that sediment thickness is one of the key parameters controlling the maximum magnitude a megathrust can generate. Moreover, Monte Carlo simulations highlighted that the occurrence of great earthquakes on sediment-rich subduction segments is very unlikely (p-value≪0.05) related to pure chance. To understand how sediments in the subduction channel regulate earthquake size, this study extends and demystifies multivariate, spatiotemporally limited data through numerical modeling. We use the 2D Seismo-Thermo-Mechanical modeling approach to simulate both the long- and short-term dynamics of subduction and related seismogenesis (van Dinther et al., JGR, 2013). These models solve for the conservation of mass, momentum and energy using a visco-elasto-plastic rheology with rate-dependent friction. Results show that subducted sediments have a strong influence on the long-term evolution of the convergent margin. Increasing the sediment thickness on the incoming plate from 0 to 6 km causes a decrease of slab dip from 23° to 10°. This, in addition to increased radiogenic heating, extends isotherms, thereby widening the seismogenic portion of the megathrust from 80 to 150 km. Consequently, over tens of thousands of years, we observe that the maximum moment magnitude of megathrust earthquakes increases from 8.2 to 9.2 for these shallower and warmer interfaces. In addition, we observe more and larger splay faults, which could enhance vertical seafloor displacements. These results highlight the primary role of subducted sediments in

  9. Short-term and long-term memory in early temporal lobe dysfunction.

    Science.gov (United States)

    Hershey, T; Craft, S; Glauser, T A; Hale, S

    1998-01-01

    Following medial temporal damage, mature humans are impaired in retaining new information over long delays but not short delays. The question of whether a similar dissociation occurs in children was addressed by testing children (ages 7-16) with unilateral temporal lobe epilepsy (TLE) and controls on short- and long-term memory tasks, including a spatial delayed response task (SDR). Early-onset TLE did not affect performance on short delays on SDR, but it did impair performance at the longest delay (60 s), similar to adults with unilateral medial temporal damage. In addition, early-onset TLE affected performance on pattern recall, spatial span, and verbal span with rehearsal interference. No differences were found on story recall or on a response inhibition task.

  10. Distribution of Short-Term and Lifetime Predicted Risks of Cardiovascular Diseases in Peruvian Adults

    Science.gov (United States)

    Quispe, Renato; Bazo-Alvarez, Juan Carlos; Burroughs Peña, Melissa S; Poterico, Julio A; Gilman, Robert H; Checkley, William; Bernabé-Ortiz, Antonio; Huffman, Mark D; Miranda, J Jaime

    2015-01-01

    Background Short-term risk assessment tools for prediction of cardiovascular disease events are widely recommended in clinical practice and are used largely for single time-point estimations; however, persons with low predicted short-term risk may have higher risks across longer time horizons. Methods and Results We estimated short-term and lifetime cardiovascular disease risk in a pooled population from 2 studies of Peruvian populations. Short-term risk was estimated using the atherosclerotic cardiovascular disease Pooled Cohort Risk Equations. Lifetime risk was evaluated using the algorithm derived from the Framingham Heart Study cohort. Using previously published thresholds, participants were classified into 3 categories: low short-term and low lifetime risk, low short-term and high lifetime risk, and high short-term predicted risk. We also compared the distribution of these risk profiles across educational level, wealth index, and place of residence. We included 2844 participants (50% men, mean age 55.9 years [SD 10.2 years]) in the analysis. Approximately 1 of every 3 participants (34% [95% CI 33 to 36]) had a high short-term estimated cardiovascular disease risk. Among those with a low short-term predicted risk, more than half (54% [95% CI 52 to 56]) had a high lifetime predicted risk. Short-term and lifetime predicted risks were higher for participants with lower versus higher wealth indexes and educational levels and for those living in urban versus rural areas (PPeruvian adults were classified as low short-term risk but high lifetime risk. Vulnerable adults, such as those from low socioeconomic status and those living in urban areas, may need greater attention regarding cardiovascular preventive strategies. PMID:26254303

  11. Short term depression unmasks the ghost frequency.

    Directory of Open Access Journals (Sweden)

    Tjeerd V Olde Scheper

    Full Text Available Short Term Plasticity (STP has been shown to exist extensively in synapses throughout the brain. Its function is more or less clear in the sense that it alters the probability of synaptic transmission at short time scales. However, it is still unclear what effect STP has on the dynamics of neural networks. We show, using a novel dynamic STP model, that Short Term Depression (STD can affect the phase of frequency coded input such that small networks can perform temporal signal summation and determination with high accuracy. We show that this property of STD can readily solve the problem of the ghost frequency, the perceived pitch of a harmonic complex in absence of the base frequency. Additionally, we demonstrate that this property can explain dynamics in larger networks. By means of two models, one of chopper neurons in the Ventral Cochlear Nucleus and one of a cortical microcircuit with inhibitory Martinotti neurons, it is shown that the dynamics in these microcircuits can reliably be reproduced using STP. Our model of STP gives important insights into the potential roles of STP in self-regulation of cortical activity and long-range afferent input in neuronal microcircuits.

  12. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 3. Mid-Continent region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The US Corps of Engineers' assessment of the nation's hydroelectric resources provides a current and comprehensive estimate of the potential for incremental or new generation at existing dams and other water resource projects, as well as for undeveloped sites in the US. The demand for hydroelectric power is addressed and various related policy and technical considerations are investigated to determine the incentives, constraints, and impacts of developing hydropower to meet a portion of the future energy demands. The comprehensive data represent the effort of the Corps of Engineers based on site-specific analysis and evaluation. Summary tables include estimates of the potential capacity and energy at each site in the inventory. The number of sites and potential capacity in each state are identified, but specific detailed information is included for sites in Colorado, Kansas, Montana, Nebraska, New Mexico, North Dakota, Oklahoma, South Dakota, Texas, and Wyoming.

  13. Short-term regulation of hydro powerplants. Studies on the environmental effects

    International Nuclear Information System (INIS)

    Sinisalmi, T.; Riihimaeki, J.; Vehanen, T.; Yrjaenae, T.

    1997-01-01

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs

  14. Short-term regulation of hydro powerplants. Studies on the environmental effects

    Energy Technology Data Exchange (ETDEWEB)

    Sinisalmi, T. [ed.; Forsius, J.; Muotka, J.; Soimakallio, H. [Imatran Voima Oy, Vantaa (Finland); Riihimaeki, J. [VTT, Espoo (Finland); Vehanen, T. [Finnish Game and Fisheries Research Inst. (Finland); Yrjaenae, T. [North Ostrobothnia Regional Environmental Centre, Oulu (Finland)

    1997-12-31

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs.

  15. Visual dot interaction with short-term memory.

    Science.gov (United States)

    Etindele Sosso, Faustin Armel

    2017-06-01

    Many neurodegenerative diseases have a memory component. Brain structures related to memory are affected by environmental stimuli, and it is difficult to dissociate effects of all behavior of neurons. Here, visual cortex of mice was stimulated with gratings and dot, and an observation of neuronal activity before and after was made. Bandwidth, firing rate and orientation selectivity index were evaluated. A primary communication between primary visual cortex and short-term memory appeared to show an interesting path to train cognitive circuitry and investigate the basics mechanisms of the neuronal learning. The findings also suggested the interplay between primary visual cortex and short-term plasticity. The properties inside a visual target shape the perception and affect the basic encoding. Using visual cortex, it may be possible to train the memory and improve the recovery of people with cognitive disabilities or memory deficit.

  16. Pro short-term procurement - U.S. utility

    International Nuclear Information System (INIS)

    Thompson, R.D.

    1990-01-01

    The author expresses the opinion that rather than focusing market discussions around short-term versus long-term procurement strategies, the parties need to be focusing on how long it is going to take to get to a predominantly market-based price both in uranium and enrichment. Long-term contracts are going to be around and will always be an important part of buyers' and sellers' strategies. It is evident that the annual term contract price renegotiations around the world are resulting in continually lower prices. When these price negotiations finally arrive in the range of the market price, a commodity market that resembles other energy commodity markets can be obtained

  17. Short-Term Memory in Habituation and Dishabituation

    Science.gov (United States)

    Whitlow, Jesse William, Jr.

    1975-01-01

    The present research evaluated the refractorylike response decrement, as found in habituation of auditory evoked peripheral vasoconstriction in rabbits, to determine whether or not it represents a short-term habituation process distinct from effector fatigue or sensory adaptation. (Editor)

  18. The environment and the hydroelectric in Amazonia

    International Nuclear Information System (INIS)

    La Rovere, E.L.

    1992-01-01

    Some aspects about social and environmental impacts due to the hydroelectric power plants constructed in Amazonia region are presented, including considerations of energy planning and management with international example. (C.G.C.)

  19. Augmented Reality in Informal Learning Environments: Investigating Short-term and Long-term Effects

    DEFF Research Database (Denmark)

    Sommerauer, Peter; Müller, Oliver

    2018-01-01

    field experiment with 24 participants at a mathematics exhibition to measure the effect of AR on acquiring and retaining mathematical knowledge in an informal learning environment, both short-term (i.e., directly after visiting the exhibition) and long-term (i.e., two months after the museum visit). Our...

  20. Obstacles to hydroelectric power. VDI conference on chances of hydroelectric power - conservation and environmental protection in conflict

    International Nuclear Information System (INIS)

    Sauer, H.D.

    1994-01-01

    Hydroelectric power is one of the most efficient energy sources and presents no CO 2 pollution problem, but there are obstacles as was shown at a VDI conference. Regional landscape conservation interests are in conflict with global environmental protection considerations. (orig.) [de

  1. Distribution of Short-Term and Lifetime Predicted Risks of Cardiovascular Diseases in Peruvian Adults.

    Science.gov (United States)

    Quispe, Renato; Bazo-Alvarez, Juan Carlos; Burroughs Peña, Melissa S; Poterico, Julio A; Gilman, Robert H; Checkley, William; Bernabé-Ortiz, Antonio; Huffman, Mark D; Miranda, J Jaime

    2015-08-07

    Short-term risk assessment tools for prediction of cardiovascular disease events are widely recommended in clinical practice and are used largely for single time-point estimations; however, persons with low predicted short-term risk may have higher risks across longer time horizons. We estimated short-term and lifetime cardiovascular disease risk in a pooled population from 2 studies of Peruvian populations. Short-term risk was estimated using the atherosclerotic cardiovascular disease Pooled Cohort Risk Equations. Lifetime risk was evaluated using the algorithm derived from the Framingham Heart Study cohort. Using previously published thresholds, participants were classified into 3 categories: low short-term and low lifetime risk, low short-term and high lifetime risk, and high short-term predicted risk. We also compared the distribution of these risk profiles across educational level, wealth index, and place of residence. We included 2844 participants (50% men, mean age 55.9 years [SD 10.2 years]) in the analysis. Approximately 1 of every 3 participants (34% [95% CI 33 to 36]) had a high short-term estimated cardiovascular disease risk. Among those with a low short-term predicted risk, more than half (54% [95% CI 52 to 56]) had a high lifetime predicted risk. Short-term and lifetime predicted risks were higher for participants with lower versus higher wealth indexes and educational levels and for those living in urban versus rural areas (PPeruvian adults were classified as low short-term risk but high lifetime risk. Vulnerable adults, such as those from low socioeconomic status and those living in urban areas, may need greater attention regarding cardiovascular preventive strategies. © 2015 The Authors. Published on behalf of the American Heart Association, Inc., by Wiley Blackwell.

  2. Short-term synaptic plasticity and heterogeneity in neural systems

    Science.gov (United States)

    Mejias, J. F.; Kappen, H. J.; Longtin, A.; Torres, J. J.

    2013-01-01

    We review some recent results on neural dynamics and information processing which arise when considering several biophysical factors of interest, in particular, short-term synaptic plasticity and neural heterogeneity. The inclusion of short-term synaptic plasticity leads to enhanced long-term memory capacities, a higher robustness of memory to noise, and irregularity in the duration of the so-called up cortical states. On the other hand, considering some level of neural heterogeneity in neuron models allows neural systems to optimize information transmission in rate coding and temporal coding, two strategies commonly used by neurons to codify information in many brain areas. In all these studies, analytical approximations can be made to explain the underlying dynamics of these neural systems.

  3. Effect of short-term alkaline intervention on the performance of buffer-free single-chamber microbial fuel cell.

    Science.gov (United States)

    Yang, Na; Ren, Yueping; Li, Xiufen; Wang, Xinhua

    2017-06-01

    Anolyte acidification is a drawback restricting the electricity generation performance of the buffer-free microbial fuel cells (MFC). In this paper, a small amount of alkali-treated anion exchange resin (AER) was placed in front of the anode in the KCl mediated single-chamber MFC to slowly release hydroxyl ions (OH - ) and neutralize the H + ions that are generated by the anodic reaction in two running cycles. This short-term alkaline intervention to the KCl anolyte has promoted the proliferation of electroactive Geobacter sp. and enhanced the self-buffering capacity of the KCl-AER-MFC. The pH of the KCl anolyte in the KCl-AER-MFC increased and became more stable in each running cycle compared with that of the KCl-MFC after the short-term alkaline intervention. The maximum power density (P max ) of the KCl-AER-MFC increased from 307.5mW·m -2 to 542.8mW·m -2 , slightly lower than that of the PBS-MFC (640.7mW·m -2 ). The coulombic efficiency (CE) of the KCl-AER-MFC increased from 54.1% to 61.2% which is already very close to that of the PBS-MFC (61.9%). The results in this paper indicate that short-term alkaline intervention to the anolyte is an effective strategy to further promote the performance of buffer-free MFCs. Copyright © 2017 Elsevier B.V. All rights reserved.

  4. Perceptions of short-term medical volunteer work: a qualitative study in Guatemala.

    Science.gov (United States)

    Green, Tyler; Green, Heidi; Scandlyn, Jean; Kestler, Andrew

    2009-02-26

    Each year medical providers from wealthy countries participate in short-term medical volunteer work in resource-poor countries. Various authors have raised concern that such work has the potential to be harmful to recipient communities; however, the social science and medical literature contains little research into the perceptions of short-term medical volunteer work from the perspective of members of recipient communities. This exploratory study examines the perception of short-term medical volunteer work in Guatemala among groups of actors affected by or participating in these programs. The researchers conducted in-depth, semi-structured interviews with 72 individuals, including Guatemalan healthcare providers and health authorities, foreign medical providers, non-medical personnel working on health projects, and Guatemalan parents of children treated by a short-term volunteer group. Detailed notes and summaries of these interviews were uploaded, coded and annotated using Atlas.ti (Scientific Software Development GmbH, Berlin) to identify recurrent themes from the interviews. Informants commonly identified a need for increased access to medical services in Guatemala, and many believed that short-term medical volunteers are in a position to offer improved access to medical care in the communities where they serve. Informants most frequently cited appropriate patient selection and attention to payment systems as the best means to avoid creating dependence on foreign aid. The most frequent suggestion to improve short-term medical volunteer work was coordination with and respect for local Guatemalan healthcare providers and their communities, as insufficient understanding of the country's existing healthcare resources and needs may result in perceived harm to the recipient community. The perceived impact of short-term medical volunteer projects in Guatemala is highly variable and dependent upon the individual project. In this exploratory study, project

  5. 78 FR 5798 - Ceresco Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2013-01-28

    ... Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 19, 2012, Ceresco Hydroelectric Dam, LLC...), proposing to study the feasibility of the Ceresco Hydroelectric Project (Ceresco Project or project) to be...

  6. 76 FR 49462 - Newfound Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License...

    Science.gov (United States)

    2011-08-10

    ... Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On July 25, 2011, Newfound Hydroelectric Company (transferor) and KTZ Hydro, LLC (transferee) filed an application for transfer of license for the Newfound Hydroelectric Project...

  7. 78 FR 39725 - Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a Programmatic...

    Science.gov (United States)

    2013-07-02

    ...-001--Mississippi] Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a... license for the proposed Grenada Lake Hydroelectric Project No. 13702. The Programmatic Agreement, when... Grenada Lake Hydroelectric Project, the U.S. Army Corps of Engineers, the Choctaw Nation of Oklahoma, the...

  8. Qualitative similarities in the visual short-term memory of pigeons and people

    OpenAIRE

    Gibson, Brett; Wasserman, Edward; Luck, Steven J.

    2011-01-01

    Visual short-term memory plays a key role in guiding behavior, and individual differences in visual short-term memory capacity are strongly predictive of higher cognitive abilities. To provide a broader evolutionary context for understanding this memory system, we directly compared the behavior of pigeons and humans on a change detection task. Although pigeons had a lower storage capacity and a higher lapse rate than humans, both species stored multiple items in short-term memory and conforme...

  9. Short-term versus long-term contracting for uranium enrichment services

    International Nuclear Information System (INIS)

    Rudy, G.P.

    1990-01-01

    The US Department of Energy (US DOE) is the world's largest and most experienced supplier of uranium enrichment services. Through the late 1970s and early 1980s, emerging market forces transformed what was once a monopoly into a highly competitive industry. In the early 1980's the DOE lost market share. But as we enter the 1990s, new market forces have emerged. The US DOE believes a responsible balance between long-term and short-term contracting will be the key to success and the key to assuring the long-term health and reliability of the nuclear fuel industry. The US DOE intends to be in this nuclear business for a long time and will continue to offer reliable and responsive services second to none

  10. [Impulsiveness Among Short-Term Prisoners with Antisocial Personality Disorder].

    Science.gov (United States)

    Lang, Fabian U; Otte, Stefanie; Vasic, Nenad; Jäger, Markus; Dudeck, Manuela

    2015-07-01

    The study aimed to investigate the correlation between impulsiveness and the antisocial personality disorder among short-term prisoners. The impulsiveness was diagnosed by the Barratt Impulsiveness Scale (BIS). Short-term prisoners with antisocial personality disorder scored significant higher marks on the BIS total scale than those without any personality disorder. In detail, they scored higher marks on each subscale regarding attentional, motor and nonplanning impulsiveness. Moderate and high effects were calculated. It is to be considered to regard impulsivity as a conceptual component of antisociality. © Georg Thieme Verlag KG Stuttgart · New York.

  11. Potential breeding distributions of U.S. birds predicted with both short-term variability and long-term average climate data.

    Science.gov (United States)

    Bateman, Brooke L; Pidgeon, Anna M; Radeloff, Volker C; Flather, Curtis H; VanDerWal, Jeremy; Akçakaya, H Resit; Thogmartin, Wayne E; Albright, Thomas P; Vavrus, Stephen J; Heglund, Patricia J

    2016-12-01

    Climate conditions, such as temperature or precipitation, averaged over several decades strongly affect species distributions, as evidenced by experimental results and a plethora of models demonstrating statistical relations between species occurrences and long-term climate averages. However, long-term averages can conceal climate changes that have occurred in recent decades and may not capture actual species occurrence well because the distributions of species, especially at the edges of their range, are typically dynamic and may respond strongly to short-term climate variability. Our goal here was to test whether bird occurrence models can be predicted by either covariates based on short-term climate variability or on long-term climate averages. We parameterized species distribution models (SDMs) based on either short-term variability or long-term average climate covariates for 320 bird species in the conterminous USA and tested whether any life-history trait-based guilds were particularly sensitive to short-term conditions. Models including short-term climate variability performed well based on their cross-validated area-under-the-curve AUC score (0.85), as did models based on long-term climate averages (0.84). Similarly, both models performed well compared to independent presence/absence data from the North American Breeding Bird Survey (independent AUC of 0.89 and 0.90, respectively). However, models based on short-term variability covariates more accurately classified true absences for most species (73% of true absences classified within the lowest quarter of environmental suitability vs. 68%). In addition, they have the advantage that they can reveal the dynamic relationship between species and their environment because they capture the spatial fluctuations of species potential breeding distributions. With this information, we can identify which species and guilds are sensitive to climate variability, identify sites of high conservation value where climate

  12. Reinsurance by short-term reinsurers in South Africa

    Directory of Open Access Journals (Sweden)

    Fernhout, C. L. R.

    2016-02-01

    Full Text Available The short-term reinsurance process usually involves three parties, namely the insurer, the reinsurer and the original policyholder, as the insurer cedes a part of the covered risk of the policyholder to the reinsurer. This research however addresses the perceptions of reinsurers regarding their reinsurance activities, where the reinsurer sells reinsurance to other insurance entities (viz. insurers and reinsurers, as well as buys reinsurance from other insurance entities. The crux of short-term reinsurance is therefore mutually loss sharing between the various insurance entities. The objective of this research focuses on the improvement of financial decision-making regarding the reinsurance operations of the reinsurers. To achieve this objective a literature study was undertaken to provide adequate background to compile a questionnaire for the empirical survey. The primary study embodies the perceptions of the South African short-term reinsurers regarding the following aspects: the various reasons why reinsurance occurs; the contracts / methods of reinsurance; the bases / forms of reinsurance; and the factors which determine the retention levels of a reinsurer. South Africa is classified as a developing economy, is a member of the BRICS countries and has an emerging market economy. The empirical results should therefore also be valuable to other countries which are classified similarly

  13. Frequency-specific insight into short-term memory capacity.

    Science.gov (United States)

    Feurra, Matteo; Galli, Giulia; Pavone, Enea Francesco; Rossi, Alessandro; Rossi, Simone

    2016-07-01

    The digit span is one of the most widely used memory tests in clinical and experimental neuropsychology for reliably measuring short-term memory capacity. In the forward version, sequences of digits of increasing length have to be reproduced in the order in which they are presented, whereas in the backward version items must be reproduced in the reversed order. Here, we assessed whether transcranial alternating current stimulation (tACS) increases the memory span for digits of young and midlife adults. Imperceptibly weak electrical currents in the alpha (10 Hz), beta (20 Hz), theta (5 Hz), and gamma (40 Hz) range, as well as a sham stimulation, were delivered over the left posterior parietal cortex, a cortical region thought to sustain maintenance processes in short-term memory through oscillatory brain activity in the beta range. We showed a frequency-specific effect of beta-tACS that robustly increased the forward memory span of young, but not middle-aged, healthy individuals. The effect correlated with age: the younger the subjects, the greater the benefit arising from parietal beta stimulation. Our results provide evidence of a short-term memory capacity improvement in young adults by online frequency-specific tACS application. Copyright © 2016 the American Physiological Society.

  14. Margins for uncertainties in Hydro-Quebec's short-term operations planning

    International Nuclear Information System (INIS)

    Beaumont, M.; Raymond, M.P.

    1995-01-01

    A method developed by Hydro-Quebec for establishing the short-term capacity margin requirements for dealing with uncertainties from 1 to 24 hours in advance, was presented. Hydro-Quebec's generating system and characterization of the problems associated with meeting load requirements were discussed. Factors accounted for included those concerning internal load forecast, unit forced outages, risks of not meeting firm load, risks of not meeting real-time reserves requirements, costs, time delays, and operating constraints of non-hydraulic resources. Each of these were described in detail, and methods for combining mathematical uncertainties were presented. Procedures used for selecting an appropriate risk level and building a margin policy were described. Improvements for more accurate modelling were discussed. 5 refs., 2 tabs., 5 figs

  15. Short-term memory in Down syndrome: applying the working memory model.

    Science.gov (United States)

    Jarrold, C; Baddeley, A D

    2001-10-01

    This paper is divided into three sections. The first reviews the evidence for a verbal short-term memory deficit in Down syndrome. Existing research suggests that short-term memory for verbal information tends to be impaired in Down syndrome, in contrast to short-term memory for visual and spatial material. In addition, problems of hearing or speech do not appear to be a major cause of difficulties on tests of verbal short-term memory. This suggests that Down syndrome is associated with a specific memory problem, which we link to a potential deficit in the functioning of the 'phonological loop' of Baddeley's (1986) model of working memory. The second section considers the implications of a phonological loop problem. Because a reasonable amount is known about the normal functioning of the phonological loop, and of its role in language acquisition in typical development, we can make firm predictions as to the likely nature of the short-term memory problem in Down syndrome, and its consequences for language learning. However, we note that the existing evidence from studies with individuals with Down syndrome does not fit well with these predictions. This leads to the third section of the paper, in which we consider key questions to be addressed in future research. We suggest that there are two questions to be answered, which follow directly from the contradictory results outlined in the previous section. These are 'What is the precise nature of the verbal short-term memory deficit in Down syndrome', and 'What are the consequences of this deficit for learning'. We discuss ways in which these questions might be addressed in future work.

  16. Methane and CO2 emissions from China's hydroelectric reservoirs: a new quantitative synthesis.

    Science.gov (United States)

    Li, Siyue; Zhang, Quanfa; Bush, Richard T; Sullivan, Leigh A

    2015-04-01

    Controversy surrounds the green credentials of hydroelectricity because of the potentially large emission of greenhouse gases (GHG) from associated reservoirs. However, limited and patchy data particularly for China is constraining the current global assessment of GHG releases from hydroelectric reservoirs. This study provides the first evaluation of the CO2 and CH4 emissions from China's hydroelectric reservoirs by considering the reservoir water surface and drawdown areas, and downstream sources (including spillways and turbines, as well as river downstream). The total emission of 29.6 Tg CO2/year and 0.47 Tg CH4/year from hydroelectric reservoirs in China, expressed as CO2 equivalents (eq), corresponds to 45.6 Tg CO2eq/year, which is 2-fold higher than the current GHG emission (ca. 23 Tg CO2eq/year) from global temperate hydropower reservoirs. China's average emission of 70 g CO2eq/kWh from hydropower amounts to 7% of the emissions from coal-fired plant alternatives. China's hydroelectric reservoirs thus currently mitigate GHG emission when compared to the main alternative source of electricity with potentially far great reductions in GHG emissions and benefits possible through relatively minor changes to reservoir management and design. On average, the sum of drawdown and downstream emission including river reaches below dams and turbines, which is overlooked by most studies, represents the equivalent of 42% of the CO2 and 92% of CH4 that emit from hydroelectric reservoirs in China. Main drivers on GHG emission rates are summarized and highlight that water depth and stratification control CH4 flux, and CO2 flux shows significant negative relationships with pH, DO, and Chl-a. Based on our finding, a substantial revision of the global carbon emissions from hydroelectric reservoirs is warranted.

  17. 75 FR 77862 - FFP Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2010-12-14

    ... Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit Applications Accepted.... On August 6, 2010, FFP Missouri 16, LLC (FFP) and Solia 9 Hydroelectric, LLC filed preliminary permit...-2822. Solia 9 Hydroelectric's proposed Lock and Dam 15 Hydropower Project (Project No. 13827-000) would...

  18. 75 FR 37790 - Mahoning Creek Hydroelectric Company, LLC; Notice of Intent To Issue a Supplemental Environmental...

    Science.gov (United States)

    2010-06-30

    ... Hydroelectric Company, LLC; Notice of Intent To Issue a Supplemental Environmental Assessment for the Proposed Mahoning Creek Hydroelectric Project June 23, 2010. On March 23, 2010, Commission staff issued an Environmental Assessment (EA) for the proposed Mahoning Creek Hydroelectric Project. On April 22, 2010, the U.S...

  19. Short-term wind speed prediction using an unscented Kalman filter based state-space support vector regression approach

    International Nuclear Information System (INIS)

    Chen, Kuilin; Yu, Jie

    2014-01-01

    Highlights: • A novel hybrid modeling method is proposed for short-term wind speed forecasting. • Support vector regression model is constructed to formulate nonlinear state-space framework. • Unscented Kalman filter is adopted to recursively update states under random uncertainty. • The new SVR–UKF approach is compared to several conventional methods for short-term wind speed prediction. • The proposed method demonstrates higher prediction accuracy and reliability. - Abstract: Accurate wind speed forecasting is becoming increasingly important to improve and optimize renewable wind power generation. Particularly, reliable short-term wind speed prediction can enable model predictive control of wind turbines and real-time optimization of wind farm operation. However, this task remains challenging due to the strong stochastic nature and dynamic uncertainty of wind speed. In this study, unscented Kalman filter (UKF) is integrated with support vector regression (SVR) based state-space model in order to precisely update the short-term estimation of wind speed sequence. In the proposed SVR–UKF approach, support vector regression is first employed to formulate a nonlinear state-space model and then unscented Kalman filter is adopted to perform dynamic state estimation recursively on wind sequence with stochastic uncertainty. The novel SVR–UKF method is compared with artificial neural networks (ANNs), SVR, autoregressive (AR) and autoregressive integrated with Kalman filter (AR-Kalman) approaches for predicting short-term wind speed sequences collected from three sites in Massachusetts, USA. The forecasting results indicate that the proposed method has much better performance in both one-step-ahead and multi-step-ahead wind speed predictions than the other approaches across all the locations

  20. Daily storage management of hydroelectric facilities

    NARCIS (Netherlands)

    Chappin, E.J.L.; Ferrero, M.; Lazzeroni, P.; Lukszo, Z.; Olivero, M.; Repetto, M.

    2012-01-01

    This work presents a management procedure for hydroelectric facilities with daily storage. The water storage gives an additional degree of freedom allowing to shift in time power production when it is more convenient and to work at the maximum efficiency of hydraulic turbine. The management is

  1. Effect of zinc supplementation of pregnant rats on short-term and long-term memory of their offspring

    International Nuclear Information System (INIS)

    Ali, M.A.; Ghotbeddin, Z.; Parham, G.H.

    2007-01-01

    To see the dose dependent effects of zinc chloride on the short-term and long-term memory in a shuttle box (rats). Six pair adult wistar rats were taken for this experiment. One group of pregnant rats received a daily oral dose of 20 mg/kg Zn as zinc chloride and the remaining groups received a daily oral dose of (30, 50, 70,100 mg/kg) zinc chloride for two weeks by gavage. One month after birth, a shuttle box was used to test short-term and long-term memory. Two criteria were considered to behavioral test, including latency in entering dark chamber and time spent in the dark chamber. This experiment showed that oral administration of ZnCl/sub 2/ with (20, 30, 50 mg/kg/day) doses after 2 weeks at the stage of pregnancy, can improve the working memory of their offspring (p<0.05). Where as ZnCl/sub 2/ with 30 mg/kg/day dose has been more effective than other doses (p<0.001). But rat which received ZnCl/sub 2/ with 100 mg/kg/day at the stage of pregnancy, has shown significant impairment in working (short-term) memory of their offspring (p<0.05) and there was no significant difference in reference (long-term) memory 3 for any of groups. This study has demonstrated that zinc chloride consumption with 30 mg/kg/day dose for two weeks at the stage of pregnancy in rats, has positive effect on short-term memory on their offspring. But consumption of enhanced zinc 100 mg/kg/day in pregnant rats can cause short-term memory impairment. On the other hand, zinc supplementation such as zinc chloride has no effect on long-term memory. (author)

  2. Short-term exposure to air pollution and digital vascular function.

    Science.gov (United States)

    Ljungman, Petter L; Wilker, Elissa H; Rice, Mary B; Schwartz, Joel; Gold, Diane R; Koutrakis, Petros; Vita, Joseph A; Mitchell, Gary F; Vasan, Ramachandran S; Benjamin, Emelia J; Mittleman, Murray A; Hamburg, Naomi M

    2014-09-01

    We investigated associations between ambient air pollution and microvessel function measured by peripheral arterial tonometry between 2003 and 2008 in the Framingham Heart Study Offspring and Third Generation Cohorts. We measured particulate matter with aerodynamic diameter ≤2.5 µm (PM2.5), black carbon, sulfates, particle number, nitrogen oxides, and ozone by using fixed monitors, and we determined moving averages for 1-7 days preceding vascular testing. We examined associations between these exposures and hyperemic response to ischemia and baseline pulse amplitude, a measure of arterial tone (n = 2,369). Higher short-term exposure to air pollutants, including PM2.5, black carbon, and particle number was associated with higher baseline pulse amplitude. For example, higher 3-day average PM2.5 exposure was associated with 6.3% higher baseline pulse amplitude (95% confidence interval: 2.0, 10.9). However, there were no consistent associations between the air pollution exposures assessed and hyperemic response. Our findings in a community-based sample exposed to relatively low pollution levels suggest that short-term exposure to ambient particulate pollution is not associated with vasodilator response, but that particulate air pollution is associated with baseline pulse amplitude, suggesting potentially adverse alterations in baseline vascular tone or compliance. © The Author 2014. Published by Oxford University Press on behalf of the Johns Hopkins Bloomberg School of Public Health. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  3. Short-term memory in zebrafish (Danio rerio).

    Science.gov (United States)

    Jia, Jason; Fernandes, Yohaan; Gerlai, Robert

    2014-08-15

    Learning and memory represent perhaps the most complex behavioral phenomena. Although their underlying mechanisms have been extensively analyzed, only a fraction of the potential molecular components have been identified. The zebrafish has been proposed as a screening tool with which mechanisms of complex brain functions may be systematically uncovered. However, as a relative newcomer in behavioral neuroscience, the zebrafish has not been well characterized for its cognitive and mnemonic features, thus learning and/or memory screens with adults have not been feasible. Here we study short-term memory of adult zebrafish. We show animated images of conspecifics (the stimulus) to the experimental subject during 1 min intervals on ten occasions separated by different (2, 4, 8 or 16 min long) inter-stimulus intervals (ISI), a between subject experimental design. We quantify the distance of the subject from the image presentation screen during each stimulus presentation interval, during each of the 1-min post-stimulus intervals immediately following the stimulus presentations and during each of the 1-min intervals furthest away from the last stimulus presentation interval and just before the next interval (pre-stimulus interval), respectively. Our results demonstrate significant retention of short-term memory even in the longest ISI group but suggest no acquisition of reference memory. Because in the employed paradigm both stimulus presentation and behavioral response quantification is computer automated, we argue that high-throughput screening for drugs or mutations that alter short-term memory performance of adult zebrafish is now becoming feasible. Copyright © 2014 Elsevier B.V. All rights reserved.

  4. Sustained Cortical and Subcortical Measures of Auditory and Visual Plasticity following Short-Term Perceptual Learning.

    Science.gov (United States)

    Lau, Bonnie K; Ruggles, Dorea R; Katyal, Sucharit; Engel, Stephen A; Oxenham, Andrew J

    2017-01-01

    Short-term training can lead to improvements in behavioral discrimination of auditory and visual stimuli, as well as enhanced EEG responses to those stimuli. In the auditory domain, fluency with tonal languages and musical training has been associated with long-term cortical and subcortical plasticity, but less is known about the effects of shorter-term training. This study combined electroencephalography (EEG) and behavioral measures to investigate short-term learning and neural plasticity in both auditory and visual domains. Forty adult participants were divided into four groups. Three groups trained on one of three tasks, involving discrimination of auditory fundamental frequency (F0), auditory amplitude modulation rate (AM), or visual orientation (VIS). The fourth (control) group received no training. Pre- and post-training tests, as well as retention tests 30 days after training, involved behavioral discrimination thresholds, steady-state visually evoked potentials (SSVEP) to the flicker frequencies of visual stimuli, and auditory envelope-following responses simultaneously evoked and measured in response to rapid stimulus F0 (EFR), thought to reflect subcortical generators, and slow amplitude modulation (ASSR), thought to reflect cortical generators. Enhancement of the ASSR was observed in both auditory-trained groups, not specific to the AM-trained group, whereas enhancement of the SSVEP was found only in the visually-trained group. No evidence was found for changes in the EFR. The results suggest that some aspects of neural plasticity can develop rapidly and may generalize across tasks but not across modalities. Behaviorally, the pattern of learning was complex, with significant cross-task and cross-modal learning effects.

  5. 34 CFR 664.11 - What is a short-term seminar project?

    Science.gov (United States)

    2010-07-01

    ... short-term seminar project is— (a) Designed to help integrate international studies into an institution... 34 Education 3 2010-07-01 2010-07-01 false What is a short-term seminar project? 664.11 Section 664.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF...

  6. 75 FR 22122 - Gibson Dam Hydroelectric Company, LLC; Notice of Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-04-27

    ... Hydroelectric Company, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests April 20, 2010. Take notice that the following hydroelectric application has been filed with the.... Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric Company...

  7. Aspects if stochastic models for short-term hydropower scheduling and bidding

    Energy Technology Data Exchange (ETDEWEB)

    Belsnes, Michael Martin [Sintef Energy, Trondheim (Norway); Follestad, Turid [Sintef Energy, Trondheim (Norway); Wolfgang, Ove [Sintef Energy, Trondheim (Norway); Fosso, Olav B. [Dep. of electric power engineering NTNU, Trondheim (Norway)

    2012-07-01

    This report discusses challenges met when turning from deterministic to stochastic decision support models for short-term hydropower scheduling and bidding. The report describes characteristics of the short-term scheduling and bidding problem, different market and bidding strategies, and how a stochastic optimization model can be formulated. A review of approaches for stochastic short-term modelling and stochastic modelling for the input variables inflow and market prices is given. The report discusses methods for approximating the predictive distribution of uncertain variables by scenario trees. Benefits of using a stochastic over a deterministic model are illustrated by a case study, where increased profit is obtained to a varying degree depending on the reservoir filling and price structure. Finally, an approach for assessing the effect of using a size restricted scenario tree to approximate the predictive distribution for stochastic input variables is described. The report is a summary of the findings of Work package 1 of the research project #Left Double Quotation Mark#Optimal short-term scheduling of wind and hydro resources#Right Double Quotation Mark#. The project aims at developing a prototype for an operational stochastic short-term scheduling model. Based on the investigations summarized in the report, it is concluded that using a deterministic equivalent formulation of the stochastic optimization problem is convenient and sufficient for obtaining a working prototype. (author)

  8. 22 CFR 62.21 - Short-term scholars.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Short-term scholars. 62.21 Section 62.21 Foreign Relations DEPARTMENT OF STATE PUBLIC DIPLOMACY AND EXCHANGES EXCHANGE VISITOR PROGRAM Specific... programs, confer on common problems and projects, and promote professional relationships and communications...

  9. Scalable data-driven short-term traffic prediction

    NARCIS (Netherlands)

    Friso, K.; Wismans, L. J.J.; Tijink, M. B.

    2017-01-01

    Short-term traffic prediction has a lot of potential for traffic management. However, most research has traditionally focused on either traffic models-which do not scale very well to large networks, computationally-or on data-driven methods for freeways, leaving out urban arterials completely. Urban

  10. Short-Term Saved Leave Scheme

    CERN Multimedia

    2007-01-01

    As announced at the meeting of the Standing Concertation Committee (SCC) on 26 June 2007 and in http://Bulletin No. 28/2007, the existing Saved Leave Scheme will be discontinued as of 31 December 2007. Staff participating in the Scheme will shortly receive a contract amendment stipulating the end of financial contributions compensated by save leave. Leave already accumulated on saved leave accounts can continue to be taken in accordance with the rules applicable to the current scheme. A new system of saved leave will enter into force on 1 January 2008 and will be the subject of a new implementation procedure entitled "Short-term saved leave scheme" dated 1 January 2008. At its meeting on 4 December 2007, the SCC agreed to recommend the Director-General to approve this procedure, which can be consulted on the HR Department’s website at the following address: https://cern.ch/hr-services/services-Ben/sls_shortterm.asp All staff wishing to participate in the new scheme a...

  11. Short-Term Saved Leave Scheme

    CERN Multimedia

    HR Department

    2007-01-01

    As announced at the meeting of the Standing Concertation Committee (SCC) on 26 June 2007 and in http://Bulletin No. 28/2007, the existing Saved Leave Scheme will be discontinued as of 31 December 2007. Staff participating in the Scheme will shortly receive a contract amendment stipulating the end of financial contributions compensated by save leave. Leave already accumulated on saved leave accounts can continue to be taken in accordance with the rules applicable to the current scheme. A new system of saved leave will enter into force on 1 January 2008 and will be the subject of a new im-plementation procedure entitled "Short-term saved leave scheme" dated 1 January 2008. At its meeting on 4 December 2007, the SCC agreed to recommend the Director-General to approve this procedure, which can be consulted on the HR Department’s website at the following address: https://cern.ch/hr-services/services-Ben/sls_shortterm.asp All staff wishing to participate in the new scheme ...

  12. Will initiatives to promote hydroelectricity consumption be effective? Evidence from univariate and panel LM unit root tests with structural breaks

    International Nuclear Information System (INIS)

    Lean, Hooi Hooi; Smyth, Russell

    2014-01-01

    This paper examines whether initiatives to promote hydroelectricity consumption are likely to be effective by applying univariate and panel Lagrange Multiplier (LM) unit root tests to hydroelectricity consumption in 55 countries over the period 1965–2011. We find that for the panel, as well as about four-fifths of individual countries, that hydroelectricity consumption is stationary. This result implies that shocks to hydroelectricity consumption in most countries will only result in temporary deviations from the long-run growth path. An important consequence of this finding is that initiatives designed to have permanent positive effects on hydroelectricity consumption, such as large-scale dam construction, are unlikely to be effective in increasing the share of hydroelectricity, relative to consumption of fossil fuels. - Highlights: • Applies unit root tests to hydroelectricity consumption. • Hydroelectricity consumption is stationary. • Shocks to hydroelectricity consumption result in temporary deviations from the long-run growth path

  13. Maternal haemoglobin and short-term neonatal outcome in preterm neonates.

    Directory of Open Access Journals (Sweden)

    Elodie Savajols

    Full Text Available To determine whether there is a significant association between maternal haemoglobin measured before delivery and short-term neonatal outcome in very preterm neonates.We included prospectively all live births occurring from 25 to 32+6 weeks of gestation in a tertiary care centre between January 1(st 2009 and December 31(st 2011. Outborn infants and infants presenting with lethal malformations were excluded. Three hundred and thirty-nine mothers and 409 infants met the inclusion criteria. For each mother-infant pair a prospective record of epidemiologic data was performed and maternal haemoglobin concentration recorded within 24 hours before delivery was retrospectively researched. Maternal haemoglobin was divided into quartiles with the second and the third one regarded as reference as they were composed of normal haemoglobin values. Short-term outcome was defined as poor in case of death during hospital stay and/or grades III/IV intraventricular haemorrhage and/or periventricular leukomalacia and/or necessity of ventriculoperitoneal shunt.The global rate of poor short-term neonatal outcome was 11.4% and was significantly associated with low maternal haemoglobin values. This association remained significant after adjustment for antenatal corticosteroids therapy, gestational age, parity, mechanism of preterm birth, mode of delivery and birth weight (aOR = 2.97 CI 95% [1.36-6.47]. There was no relation between short-term neonatal outcome and high maternal haemoglobin concentration values.We show that low maternal haemoglobin concentration at delivery is an independent risk factor for poor short-term neonatal outcome in very preterm neonates. This study is one of the first to show such an association within the preterm population.

  14. Transfer of Information from Short- to Long-Term Memory

    Science.gov (United States)

    Modigliani, Vito; Seamon, John G.

    1974-01-01

    The present study examined current hypotheses concerning information transfer from short-term memory (STM) to long-term memory (LTM) using a Peterson STM task with word triplets presented over retention intervals of 0, 3, 6, 9, and 18 sec. (Editor)

  15. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  16. Short- and long-term memory: differential involvement of neurotransmitter systems and signal transduction cascades

    Directory of Open Access Journals (Sweden)

    MÔNICA R.M. VIANNA

    2000-09-01

    Full Text Available Since William James (1890 first distinguished primary from secondary memory, equivalent to short- and long-term memory, respectively, it has been assumed that short-term memory processes are in charge of cognition while long-term memory is being consolidated. From those days a major question has been whether short-term memory is merely a initial phase of long-term memory, or a separate phenomena. Recent experiments have shown that many treatments with specific molecular actions given into the hippocampus and related brain areas after one-trial avoidance learning can effectively cancel short-term memory without affecting long-term memory formation. This shows that short-term memory and long-term memory involve separate mechanisms and are independently processed. Other treatments, however, influence both memory types similarly, suggesting links between both at the receptor and at the post-receptor level, which should not be surprising as they both deal with nearly the same sensorimotor representations. This review examines recent advances in short- and long-term memory mechanisms based on the effect of intra-hippocampal infusion of drugs acting upon neurotransmitter and signal transduction systems on both memory types.

  17. Dispositional optimism as predictor of outcome in short- and long-term psychotherapy.

    Science.gov (United States)

    Heinonen, Erkki; Heiskanen, Tiia; Lindfors, Olavi; Härkäpää, Kristiina; Knekt, Paul

    2017-09-01

    Dispositional optimism predicts various beneficial outcomes in somatic health and treatment, but has been little studied in psychotherapy. This study investigated whether an optimistic disposition differentially predicts patients' ability to benefit from short-term versus long-term psychotherapy. A total of 326 adult outpatients with mood and/or anxiety disorder were randomized into short-term (solution-focused or short-term psychodynamic) or long-term psychodynamic therapy and followed up for 3 years. Dispositional optimism was assessed by patients at baseline with the self-rated Life Orientation Test (LOT) questionnaire. Outcome was assessed at baseline and seven times during the follow-up, in terms of depressive (BDI, HDRS), anxiety (SCL-90-ANX, HARS), and general psychiatric symptoms (SCL-90-GSI), all seven follow-up points including patients' self-reports and three including interview-based measures. Lower dispositional optimism predicted faster symptom reduction in short-term than in long-term psychotherapy. Higher optimism predicted equally rapid and eventually greater benefits in long-term, as compared to short-term, psychotherapy. Weaker optimism appeared to predict sustenance of problems early in long-term therapy. Stronger optimism seems to best facilitate engaging in and benefiting from a long-term therapy process. Closer research might clarify the psychological processes responsible for these effects and help fine-tune both briefer and longer interventions to optimize treatment effectiveness for particular patients and their psychological qualities. Weaker dispositional optimism does not appear to inhibit brief therapy from effecting symptomatic recovery. Patients with weaker optimism do not seem to gain added benefits from long-term therapy, but instead may be susceptible to prolonged psychiatric symptoms in the early stages of long-term therapy. © 2016 The British Psychological Society.

  18. The effects of long- and short-term interdisciplinary treatment approaches in women with fibromyalgia: a randomized controlled trial.

    Science.gov (United States)

    Saral, Ilknur; Sindel, Dilsad; Esmaeilzadeh, Sina; Sertel-Berk, Hanife Ozlem; Oral, Aydan

    2016-10-01

    We investigated the effects of long- and short-term interdisciplinary treatment approaches for reducing symptoms and improving health-related quality of life (HRQoL) and physical functions of patients with fibromyalgia and compared the effects of two different interdisciplinary treatment approaches. We conducted a prospective, randomized, controlled trial involving 66 women with fibromyalgia eligible for the study at a university hospital setting. The patients were randomized into three groups (allocation ratio 1:1:1) using a computer-generated random numbers: a long-term interdisciplinary treatment group (LG, n = 22) that participated in 10 sessions (3-h once-weekly session for 10 weeks) of cognitive behavioral therapy (CBT) together with exercise training and other fibromyalgia related educational programs (two full days); a short-term interdisciplinary treatment group (SG, n = 22) that received two full days of educational, exercise, and CBT programs; and a control group (CG, n = 22). The patients were evaluated at baseline and 6 months after treatment using the visual analog scale (pain, fatigue, and sleep), Fibromyalgia Impact Questionnaire, Beck Depression Inventory, Short Form-36, tender point numbers, and pressure algometry as primary outcomes. The statistical analysis was confined to the 'per-protocol' set. No blinding was performed. The number of patients analyzed was 21 in the LG, 19 in the SG, and 19 in the CG. The intensity of pain (p treatment approaches when compared with controls; the long-term treatment was found more effective in reducing pain than the short-term. Both, long- and short-term interdisciplinary treatments were effective in reducing the severity of some symptoms and disease activity in patients with fibromyalgia. The short-term program well meets the needs of women with fibromyalgia particularly in relation to pain and health status as measured using FIQ; however, a long-term program may be beneficial in reducing fatigue and

  19. Costa Rica: Hydroelectric utility Energía Global finances upstream reforestation

    OpenAIRE

    Energía Global (Global Energy S.A.); The National Forest Office; National Fund for Forest Financing (FONAFIFO)

    2006-01-01

    Metadata only record The goal of Energía Global is to increase both the stream flow and decrease sedimentation in the hydroelectric reservoirs. They are attempting to do this by reforestation projects as well as forest conservation. The sources of revenue for this project are from the private hydroelectric company and the government through taxes on fossil fuels. PES-1 (Payments for Environmental Services Associate Award)

  20. Deficits in verbal long-term memory and learning in children with poor phonological short-term memory skills.

    Science.gov (United States)

    Gathercole, Susan E; Briscoe, Josie; Thorn, Annabel; Tiffany, Claire

    2008-03-01

    Possible links between phonological short-term memory and both longer term memory and learning in 8-year-old children were investigated in this study. Performance on a range of tests of long-term memory and learning was compared for a group of 16 children with poor phonological short-term memory skills and a comparison group of children of the same age with matched nonverbal reasoning abilities but memory scores in the average range. The low-phonological-memory group were impaired on longer term memory and learning tasks that taxed memory for arbitrary verbal material such as names and nonwords. However, the two groups performed at comparable levels on tasks requiring the retention of visuo-spatial information and of meaningful material and at carrying out prospective memory tasks in which the children were asked to carry out actions at a future point in time. The results are consistent with the view that poor short-term memory function impairs the longer-term retention and ease of learning of novel verbal material.