WorldWideScience

Sample records for short test procedure

  1. Amsterdam Short-Term Memory test: a new procedure for the detection of feigned memory deficits

    NARCIS (Netherlands)

    Schagen, S.; Schmand, B.; de Sterke, S.; Lindeboom, J.

    1997-01-01

    The validity of two malingering tests, the newly developed Amsterdam Short-Term Memory (ASTM) test and the Distraction test (Baker, Hanley, Jackson, Kimmance, & Slade, 1993) was examined in a group of patients with closed-head injury (CHI), a normal control group, and a control group with

  2. Automation of the testing procedure

    International Nuclear Information System (INIS)

    Haas, H.; Fleischer, M.; Bachner, E.

    1979-01-01

    For the judgement of technologies applied and the testing of specific components of the HTR primary circuit, complex test procedures and data evaluations are required. Extensive automation of these test procedures is indispensable. (orig.) [de

  3. Toddler test or procedure preparation

    Science.gov (United States)

    ... a test or procedure: Explain the procedure in language your child understands, using plain words. Avoid abstract terms. Make sure your child understands the exact body part involved in the test, and that the ...

  4. MITG test procedure and results

    International Nuclear Information System (INIS)

    Eck, M.E.; Mukunda, M.

    1983-01-01

    Elements and modules for Radioisotope Thermoelectric Generator have been performance tested since the inception of the RTG program. These test articles seldom resembled flight hardware and often lacked adequate diagnostic instrumentation. Because of this, performance problems were not identified in the early stage of program development. The lack of test data in an unexpected area often hampered the development of a problem solution. A procedure for conducting the MITG Test was developed in an effort to obtain data in a systematic, unambiguous manner. This procedure required the development of extensive data acquisition software and test automation. The development of a facility to implement the test procedure, the facility hardware and software requirements, and the results of the MITG testing are the subject of this paper

  5. Adolescent test or procedure preparation

    Science.gov (United States)

    ... someone else) during the procedure Playing hand-held video games Using guided imagery Trying other distractions, such as ... effects the test may cause. Older teens may benefit from videos that show adolescents of the same age explaining ...

  6. Harmine treatment enhances short-term memory in old rats: Dissociation of cognition and the ability to perform the procedural requirements of maze testing.

    Science.gov (United States)

    Mennenga, Sarah E; Gerson, Julia E; Dunckley, Travis; Bimonte-Nelson, Heather A

    2015-01-01

    Harmine is a naturally occurring monoamine oxidase inhibitor that has recently been shown to selectively inhibit the dual-specificity tyrosine-(Y)-phosphorylation-regulated kinase 1A (DYRK1A). We investigated the cognitive effects of 1mg (low) Harmine and 5mg (high) Harmine using the delayed-match-to-sample (DMS) asymmetrical 3-choice water maze task to evaluate spatial working and recent memory, and the Morris water maze task (MM) to test spatial reference memory. Animals were also tested on the visible platform task, a water-escape task with the same motor, motivational, and reinforcement components as the other tasks used to evaluate cognition, but differing in its greater simplicity and that the platform was visible above the surface of the water. A subset of the Harmine-high treated animals showed clear motor impairments on all behavioral tasks, and the visible platform task confirmed a lack of competence to perform the procedural components of water maze testing. After excluding animals from the high dose group that could not perform the procedural components of a swim task, it was revealed that both high- and low-dose treatment with Harmine enhanced performance on the latter portion of DMS testing, but had no effect on MM performance. Thus, this study demonstrates the importance of confirming motor and visual competence when studying animal cognition, and verifies the one-day visible platform task as a reliable measure of ability to perform the procedural components necessary for completion of a swim task. Copyright © 2014. Published by Elsevier Inc.

  7. Inspection system performance test procedure

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1995-01-01

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system

  8. TMACS Test Procedure TP011: Panalarm Interface

    International Nuclear Information System (INIS)

    Seghers, R.; Washburn, S.J.

    1994-01-01

    The TMACS Software Test Procedures translate the project's acceptance criteria into test steps. The TMACS Test Plan (WHC-SD-WM-TP-148) is fulfilled when all Test Cases are approved. This Test Procedure tests the TMACS Panalarm Interface functions

  9. Biomonitoring test procedures and biological criteria

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A. [Oak Ridge National Lab., TN (United States); Lipschultz, M.J. [City of Las Vegas, NV (United States); Foster, W.E. [Saint Mary`s Coll., Winona, MN (United States)

    1997-10-01

    The Water Environment Federation recently issued a special publication, Biomonitoring in the Water Environment. In this paper, the authors highlight the contents of the chapter 3, Biomonitoring Test Procedures, identify current trends in test procedures and introduce the concept of biological criteria (biocriteria). The book chapter (and this paper) focuses on freshwater and marine chronic and acute toxicity tests used in the National Pollutant Discharge Elimination System (NPDES) permits program to identify effluents and receiving waters containing toxic materials in acutely or chronically toxic concentrations. The two major categories of toxicity tests include acute tests and chronic tests. The USEPA chronic tests required in NPDEs permits have been shortened to 7 days by focusing on the most sensitive life-cycle stages; these tests are often referred to as short-term chronic tests. The type of test(s) required depend on NPDES permit requirements, objectives of the test, available resources, requirements of the test organisms, and effluent characteristics such as variability in flow or toxicity. The permit writer will determine the requirements for toxicity test(s) by considering such factors as dilution, effluent variability, and exposure variability. Whether the required test is acute or chronic, the objective of the test is to estimate the safe or no effect concentration which is defined as the concentration which will permit normal propagation of fish and other aquatic life in the receiving waters. In this paper, the authors review the types of toxicity tests, the commonly used test organisms, and the uses of toxicity test data. In addition, they briefly describe research on new methods and the use of biological criteria.

  10. Short- circuit tests of circuit breakers

    OpenAIRE

    Chorovský, P.

    2015-01-01

    This paper deals with short-circuit tests of low voltage electrical devices. In the first part of this paper, there are described basic types of short- circuit tests and their principles. Direct and indirect (synthetic) tests with more details are described in the second part. Each test and principles are explained separately. Oscilogram is obtained from short-circuit tests of circuit breakers at laboratory. The aim of this research work is to propose a test circuit for performing indirect test.

  11. TMACS Test Procedure TP009: Acromag Driver

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Acromag Software Driver (Bridge Code)

  12. TMACS Test Procedure TP007: System administration

    International Nuclear Information System (INIS)

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions

  13. TMACS Test Procedure TP002: Trending

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions

  14. Preschooler test or procedure preparation

    Science.gov (United States)

    ... your child during and after the procedure with books, songs, counting, deep breathing, or blowing bubbles. PLAY ... can be present during the procedure. Ask if anesthesia can be used to reduce your child's discomfort. ...

  15. Procedural status of prosecutor during the conduction of short inquiry

    Directory of Open Access Journals (Sweden)

    Nikanorov S.A.

    2014-12-01

    Full Text Available The issues of conducting short inquiry from the position of prosecutor’s procedural status are considered. Low rate of applying short inquiry is caused by ignorance about this procedural form among the participants in criminal procedure. The initiators of conducting short inquiry were not suspects (accused, but their lawyers who followed by their own ambitions, not by the interests of defendants. The insufficiency of total time of short inquiry is noted. The author proposes to minimize prosecutors’ paperwork, notably to concentrate their attention on collecting crime data by conducting secret investigation operations, receiving explanations and other documentation. Obtained data should be processed according to police regulations. Confession of guilt, recognition of damage and consent with legal assessment of criminal act allow to collect only the evidence, indicating crime event and complicacy of a person (expertise should be established on court’s initiative. The favourable conditions of adequacy of collected evidence for establishing crime event, character and amount of damage, as well as guilt of committing crime are confirmed. The right of investigators not to examine evidences if they were not contradicted by suspect, victim or his/her representative (predetermined strength of evidence is criticized. There is no short effective procedure of trying criminal cases with rational division of powers among the authorities, conducting criminal proceeding. The author proves the necessity of reasonable approach to prosecutor’s supervision of conducting short inquiry. Main tendency of further improvement of short inquiry procedure is redivision of powers among agencies in charge of preliminary investigation and prosecutor’s office.

  16. 40 CFR 205.54 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Test procedures. 205.54 Section 205.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described...

  17. Test report - caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1995-01-01

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ''Caustic Addition System Operability Test Procedure''. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  18. Rail Impact Testing. Test Operations Procedure (TOP)

    Science.gov (United States)

    2008-09-15

    impact test. The rail impact test is used to verify structural integrity of the test item and the adequacy of the tie-down system and tie-down...strength of provisions, connection and supporting structural frame, paragraph 5.2.3 ** Superscript...parts, to include outriggers and booms) without advanced approval by SDDCTEA. Torque nuts on wire rope clips to their correct value. Torque cable

  19. Handbook of mutagenicity test procedures

    International Nuclear Information System (INIS)

    Kilbey, B.J.; Legatov, M.

    1977-01-01

    27 articles are presented on particular techniques of mutagen testing. Background information is given in materials, experimental design, pitfalls and difficults, to enable the reader to perform these tests with minimal additional help. Also included is the use of data from population records, the handling and safety aspects of mutagens and carcinogens and some of the basic statistical concepts to be borne in mind when mutation experiments are designed. (C.F.)

  20. 40 CFR 53.65 - Test procedure: Loading test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Loading test. 53.65... Characteristics of Class II Equivalent Methods for PM2.5 § 53.65 Test procedure: Loading test. (a) Overview. (1) The loading tests are designed to quantify any appreciable changes in a candidate method sampler's...

  1. 40 CFR 53.66 - Test procedure: Volatility test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Volatility test. 53.66... Characteristics of Class II Equivalent Methods for PM2.5 § 53.66 Test procedure: Volatility test. (a) Overview. This test is designed to ensure that the candidate method's losses due to volatility when sampling semi...

  2. Test procedures for salt rock

    International Nuclear Information System (INIS)

    Dusseault, M.B.

    1985-01-01

    Potash mining, salt mining, design of solution caverns in salt rocks, disposal of waste in salt repositories, and the use of granular halite backfill in underground salt rock mines are all mining activities which are practised or contemplated for the near future. Whatever the purpose, the need for high quality design parameters is evident. The authors have been testing salt rocks in the laboratory in a number of configurations for some time. Great care has been given to the quality of sample preparation and test methodology. This paper describes the methods, presents the elements of equipment design, and shows some typical results

  3. MITS Data Acquisition Subsystem Acceptance Test procedure

    International Nuclear Information System (INIS)

    Allison, R.

    1980-01-01

    This is an acceptance procedure for the Data Acquisition Subsystem of the Machine Interface Test System (MITS). Prerequisites, requirements, and detailed step-by-step instruction are presented for inspecting and performance testing the subsystem

  4. Caustic addition system operability test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E).

  5. Caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  6. 40 CFR 53.23 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... deviation about the mean and is expressed in concentration units. (2) Test procedure. (i) Allow sufficient... definition. Positive or negative response caused by a substance other than the one being measured. (2) Test...) Before testing for each interferent, allow the test analyzer to sample through the scrubber a test...

  7. W-087 Acceptance test procedure. Revision 1

    International Nuclear Information System (INIS)

    Joshi, A.W.

    1997-01-01

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks

  8. Acceptance test procedure for Project W-280

    International Nuclear Information System (INIS)

    Stites, C.G.

    1994-01-01

    This Document is the Acceptance Test Procedure for 200 Area C and SY Tank Farm Lighting Upgrade. This Acceptance Test Procedure has been prepared to demonstrate that the Tank Farm Lighting Systems function correctly as required by project criteria and as intended by design

  9. W-087 Acceptance test procedure. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  10. 10 CFR 474.4 - Test procedures.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures. 474.4 Section 474.4 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy...

  11. DACS upgrade acceptance test procedure

    International Nuclear Information System (INIS)

    Zuehlke, A.C.

    1994-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the mixer pump, directional drive system, and the instrumentation associated with the SY-101 tank and support systems, and the proper functioning of the DACS with new Model 984-785 Programmable Logic Controllers (PLCs), new MODBUS PLUS version 2.01 software for the PLCs, and version 3.72 of the GENESIS software will be systematically evaluated by performance of this procedure. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tanks. These sensors provide information such as: tank vapor space and ventilation system H 2 concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations

  12. Magnetometer calibration and test procedure

    International Nuclear Information System (INIS)

    Squier, D.M.

    1997-01-01

    Nuclear waste has been sluiced and pumped from storage tank 241-AX-104, leaving a contaminated heel volume. These operations did not include measurements of the removed waste volume leaving an unknown heel volume in the tank. A magnetometer transducer will be lowered through tank riser ports to rest on the heel's surface. The heel thickness will control the distance between the transducer and the tank's bottom The instrument's output varies with the distance from a magnetic mass, such as the tank's steel bottom, thereby enabling a measurement of the heel depth. Measurements at several tank locations will permit an estimate of the tank's heel volume. The magnetometer's output is influenced by adjacent magnetic materials, such as the tank walls, air lift circulators or other equipment installed in the tank. An adjacent vertical steel surface produces a voltage offset in the instrument's output. Measurements near a tank wall or other tank components may be corrected by noting the offset before the instrument's output is influenced by the tank bottom. An unlevel or uneven heel surface could orient the magnetometer transducer so that it is not vertically level. The magnetometer readings are influenced by these skewed transducer orientations. The magnitude of these errors and offsets must be characterized to bound the heel volume estimate range. The data collected by this activity will be statistically analyzed by SESC to state the confidence level of the heel volume estimates. A test report will document the results of the measurements

  13. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Static fractionator test. 53.64 Section 53.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.64 Test procedure: Static...

  14. DOT-7A packaging test procedure

    International Nuclear Information System (INIS)

    Kelly, D.L.

    1995-01-01

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes

  15. Small Optics Laser Damage Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, Justin [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-10-19

    This specification defines the requirements and procedure for laser damage testing of coatings and bare surfaces designated for small optics in the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL).

  16. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    International Nuclear Information System (INIS)

    THOMAS, W.K.

    2000-01-01

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field

  17. 16 CFR 1510.4 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedure. 1510.4 Section 1510.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION FEDERAL HAZARDOUS SUBSTANCES ACT REGULATIONS... plane surface. Under its own weight and in a non-compressed state apply any portion of the test sample...

  18. Diesel generator trailer acceptance test procedure

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0252 Rev. 1 and ECNs 609271, and 609272. The equipment being tested is a 150KW Diesel Generator mounted on a trailer with switchgear. The unit was purchased as a Design and Fabrication procurement activity. The ATP was written by the Seller and will be performed by the Seller with representatives of the Westinghouse Hanford Company witnessing the test at the Seller's location

  19. Portal monitor evaluation and test procedure

    International Nuclear Information System (INIS)

    Johnson, L.O.; Gupta, V.P.; Stevenson, R.L.; Rich, B.L.

    1983-10-01

    The purpose was to develop techniques and procedures to allow users to measure performance and sensitivity of portal monitors. Additionally, a methodology was developed to assist users in optimizing monitor performance. The two monitors tested utilized thin-window gas-flow proportional counters sensitive to beta and gamma radiation. Various tests were performed: a) background count rate and the statistical variability, b) detector efficiency at different distances, c) moving source sensitivity for various size sources and speeds, and d) false alarm rates at different background levels. A model was developed for the moving source measurements to compare the experimental data with measured results, and to test whether it is possible to adequately model the behavior of a portal monitor's response to a moving source. The model results were compared with the actual test results. A procedure for testing portal monitors is also given. 1 reference, 9 figures, 8 tables

  20. Parametric Sensitivity Tests- European PEM Fuel Cell Stack Test Procedures

    DEFF Research Database (Denmark)

    Araya, Samuel Simon; Andreasen, Søren Juhl; Kær, Søren Knudsen

    2014-01-01

    performed based on test procedures proposed by a European project, Stack-Test. The sensitivity of a Nafion-based low temperature PEMFC stack’s performance to parametric changes was the main objective of the tests. Four crucial parameters for fuel cell operation were chosen; relative humidity, temperature......As fuel cells are increasingly commercialized for various applications, harmonized and industry-relevant test procedures are necessary to benchmark tests and to ensure comparability of stack performance results from different parties. This paper reports the results of parametric sensitivity tests......, pressure, and stoichiometry at varying current density. Furthermore, procedures for polarization curve recording were also tested both in ascending and descending current directions....

  1. LS1 Report: short-circuit tests

    CERN Multimedia

    Katarina Anthony

    2014-01-01

    As the LS1 draws to an end, teams move from installation projects to a phase of intense testing. Among these are the so-called 'short-circuit tests'. Currently under way at Point 7, these tests verify the cables, the interlocks, the energy extraction systems, the power converters that provide current to the superconducting magnets and the cooling system.   Thermal camera images taken during tests at point 4 (IP4). Before putting beam into the LHC, all of the machine's hardware components need to be put to the test. Out of these, the most complicated are the superconducting circuits, which have a myriad of different failure modes with interlock and control systems. While these will be tested at cold - during powering tests to be done in August - work can still be done beforehand. "While the circuits in the magnets themselves cannot be tested at warm, what we can do is verify the power converter and the circuits right up to the place the cables go into the magn...

  2. 40 CFR 53.43 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... sampling zone (see § 53.42(d)). To meet the maximum blockage limit of § 53.42(a) or for convenience, part... PM10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The ratio (expressed... evenly spaced isokinetic samplers in the sampling zone (see § 53.42(d)) of the wind tunnel. Collect...

  3. Military Publications, Index of Test Operations Procedures

    Science.gov (United States)

    1981-10-01

    serial number, aad design information for majur components. Prescribes vehicle, major component, and system descrip- tive elements required; such as...mount operating characteristics. Discusses preparation for test, instrumentation, and facil- ities. Describes procedures for force measurement, carriage...backlash and accuracy, turret friction, gun balance, manual handcrank force , manual response ratio, weapon and sighting system backlash, power controller

  4. Acceptance test procedure for core sample trucks

    International Nuclear Information System (INIS)

    Smalley, J.L.

    1995-01-01

    The purpose of this Acceptance Test Procedure is to provide instruction and documentation for acceptance testing of the rotary mode core sample trucks, HO-68K-4600 and HO-68K-4647. The rotary mode core sample trucks were based upon the design of the second core sample truck (HO-68K-4345) which was constructed to implement rotary mode sampling of the waste tanks at Hanford. Acceptance testing of the rotary mode core sample trucks will verify that the design requirements have been met. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Compressed air will be substituted for nitrogen during the majority of testing, with nitrogen being used only for flow characterization

  5. Short communication Effects of drying procedures on chemical ...

    African Journals Online (AJOL)

    jancik.filip

    2016-12-31

    Dec 31, 2016 ... Another drying procedure included pre-treatment by heating in a ... freeze-drying method and that this procedure is useful for forage analyses and evaluation. ... oven drying (OD) and innovative drying procedures (pre-treatments .... This was probably caused by losses of compounds such as ammonia and.

  6. 118-B-1 excavation treatability test procedures

    International Nuclear Information System (INIS)

    Frain, J.M.

    1994-01-01

    This treatability study has two purposes: to support development of the approach to be used for burial ground remediation, and to provide specific engineering information for the design of burial grounds receiving waste generated from the 100 Area removal actions. Data generated from this test will also provide performance and cost information necessary for detailed analysis of alternatives for burial ground remediation. Further details on the test requirements, milestones and data quality objectives are described in detail in the 118-B-1 Excavation Treatability Test Plan (DOE/RL-94-43). These working procedures are intended for use by field personnel to implement the requirements of the milestone. A copy of the detailed Test Plan will be kept on file at the on-site field support trailer, and will be available for review by field personnel

  7. Short term mutagenicity tests and their application to irradiated foods

    International Nuclear Information System (INIS)

    Phillips, B.J.; Elias, P.S.

    1980-01-01

    Although traditional long-term animal tests are likely to continue to be required, these are not only extremely costly but are coming more and more to be recognised as an imprecise and unsatisfactory method of testing the safety of irradiated foods for human consumption. It is therefore clearly advisable to include a selection of quicker and more direct testing methods in any toxicological assessment procedures. The International Project has therefore undertaken a study of the feasibility of using the newer systems for investigation of irradiated foodstuffs. Although some work in this field has already been carried out, some shortcomings in the published work can be identified which justify a more detailed and intensive research programme. As expected, little difficulty has been encountered in testing food by methods involving mammals, but considerable effort has been required to adapt in vitro systems. The use of enzymatic digestion in vitro to provide food samples for testing in mammalian cell cultures has never been attempted before and the procedures developed by the Project represent a positive contribution to methodology in this field. A series of foodstuffs is being tested by a wide spectrum of short-term tests and the first results are now being obtained. (orig./MG) [de

  8. Intact Acquisition and Short-Term Retention of Non-Motor Procedural Learning in Parkinson's Disease.

    Directory of Open Access Journals (Sweden)

    Muriel T N Panouillères

    Full Text Available Procedural learning is a form of memory where people implicitly acquire a skill through repeated practice. People with Parkinson's disease (PD have been found to acquire motor adaptation, a form of motor procedural learning, similarly to healthy older adults but they have deficits in long-term retention. A similar pattern of normal learning on initial exposure with a deficit in retention seen on subsequent days has also been seen in mirror-reading, a form of non-motor procedural learning. It is a well-studied fact that disrupting sleep will impair the consolidation of procedural memories. Given the prevalence of sleep disturbances in PD, the lack of retention on following days seen in these studies could simply be a side effect of this well-known symptom of PD. Because of this, we wondered whether people with PD would present with deficits in the short-term retention of a non-motor procedural learning task, when the test of retention was done the same day as the initial exposure. The aim of the present study was then to investigate acquisition and retention in the immediate short term of cognitive procedural learning using the mirror-reading task in people with PD. This task involved two conditions: one where triads of mirror-inverted words were always new that allowed assessing the learning of mirror-reading skill and another one where some of the triads were presented repeatedly during the experiment that allowed assessing the word-specific learning. People with PD both ON and OFF their normal medication were compared to healthy older adults and young adults. Participants were re-tested 50 minutes break after initial exposure to probe for short-term retention. The results of this study show that all groups of participants acquired and retained the two skills (mirror-reading and word-specific similarly. These results suggest that neither healthy ageing nor the degeneration within the basal ganglia that occurs in PD does affect the mechanisms

  9. Procedure guideline for radioiodine test (version 3)

    International Nuclear Information System (INIS)

    Dietlein, M.; Schicha, H.; Eschner, W.; Deutsche Gesellschaft fuer Medizinische Physik; Koeln Univ.; Lassmann, M.; Deutsche Gesellschaft fuer Medizinische Physik; Wuerzburg Univ.; Leisner, B.; Allgemeines Krankenhaus St. Georg, Hamburg; Reiners, C.; Wuerzburg Univ.

    2007-01-01

    The version 3 of the procedure guideline for radioiodine test is an update of the guideline previously published in 2003. The procedure guideline discusses the pros and cons of a single measurement or of repeated measurements of the iodine-131 uptake and their optimal timing. Different formulas are described when one, two or three values of the radioiodine kinetic are available. The probe with a sodium-iodine crystal, alternatively or additionally the gamma camera using the ROI-technique are instrumentations for the measurement of iodine-131 uptake. A possible source of error is an inappropriate measurement (sonography) of the target volume. The patients' preparation includes the withdrawal of antithyroid drugs 2-3 days before radioiodine administration. The patient has to avoid iodine-containing medication and the possibility of additives of iodine in vitamin- and electrolyte-supplementation has to be considered. (orig.)

  10. Dispersant testing : a study on analytical test procedures

    International Nuclear Information System (INIS)

    Fingas, M.F.; Fieldhouse, B.; Wang, Z.; Environment Canada, Ottawa, ON

    2004-01-01

    Crude oil is a complex mixture of hydrocarbons, ranging from small, volatile compounds to very large, non-volatile compounds. Analysis of the dispersed oil is crucial. This paper described Environment Canada's ongoing studies on various traits of dispersants. In particular, it describes small studies related to dispersant effectiveness and methods to improve analytical procedures. The study also re-evaluated the analytical procedure for the Swirling Flask Test, which is now part of the ASTM standard procedure. There are new and improved methods for analyzing oil-in-water using gas chromatography (GC). The methods could be further enhanced by integrating the entire chromatogram rather than just peaks. This would result in a decrease in maximum variation from 5 per cent to about 2 per cent. For oil-dispersant studies, the surfactant-dispersed oil hydrocarbons consist of two parts: GC-resolved hydrocarbons and GC-unresolved hydrocarbons. This study also tested a second feature of the Swirling Flask Test in which the side spout was tested and compared with a new vessel with a septum port instead of a side spout. This decreased the variability as well as the energy and mixing in the vessel. Rather than being a variation of the Swirling Flask Test, it was suggested that a spoutless vessel might be considered as a completely separate test. 7 refs., 2 tabs., 4 figs

  11. Some Remarks on Foundation Pile Testing Procedures

    Science.gov (United States)

    Rybak, Jarosław

    2017-10-01

    This work presents the review of pile capacity testing techniques. In an overview, the key points in pile designing are: determination of the appropriate computational schemes, reliable data on loads and the properties of structural materials (in particular, of the soil mass, which is marked by the greatest variability). The procedure of constructing a pile foundation should include: carrying out soil tests in the scope that ensures safe designing, selecting a piling technology that is relevant both to geotechnical conditions and expected loads, drafting a piling design together with the design of load tests, setting up a testing station for further load tests, static and/or dynamic tests of pile load capacity, preceded by supplementary soil tests when the conditions of test pile installation fail to comply with the design assumptions or when the pile length exceeds the depth of the previously investigated soil, making documentation of load capacity tests (with an additional correction of the piling design), the actual piling (ongoing analysis of pile driving logs and, if necessary, testing the piles’ integrity), drawing up the as-built documentation. Unfortunately, the design is corrected after the load test have been conducted only if the piles fail to show the designed bearing capacity. The designer is then obliged to revise the design assumptions on the basis of tests results. If the test results account for the a greater bearing capacity than necessary and it would be recommendable to limit the extent of the planned (i.e. set out in the contract) piling works, usually neither the contractor nor the designer, nor even the Construction Site Supervisor, acting for the benefit of the Investor, are willing to take on the responsibility for reducing the scope of the piling works. The necessity of conducting additional control tests before and during the implementation of the construction project is often treated by the investors as an attempt at extorting extra

  12. INERT Atmosphere confinement operability test procedure

    International Nuclear Information System (INIS)

    RISENMAY, H.R.

    1999-01-01

    This Operability Test Procedure (OTP) provides instructions for testing operability of the Inert Atmosphere Confinement (IAC). The Inert Atmosphere Confinement was designed and built for opening cans of metal items that might have hydrided surfaces. Unreviewed Safety Question (USQ) PFP-97-005 addresses the discovery of suspected plutonium hydride forming on plutonium metal currently stored in the Plutonium Finishing Plant vaults. Plutonium hydride reacts quickly with air, liberating energy. The Inert Atmosphere Confinement was designed to prevent this sudden liberation of energy by opening the material in an inert argon atmosphere instead of the normal glovebox atmosphere. The IAC is located in glovebox HC-21A, room 230B of the 234-5Z Building at the Plutonium Finishing Plant (PFP) in the 200-West Area of the Hanford Site

  13. Operator coil monitoring Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Erhart, M.F.

    1995-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software's ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ''ENABLE'' and ''DISABLE'' controls from the Master and RSS stations function correctly, and only with the use of proper passwords

  14. TMACS test procedure TP009: Acromag driver. Revision 5

    International Nuclear Information System (INIS)

    Bass, R.B.; Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the testing of the functionality of the TMACS Acromag driver software in conjunction with a new bridge for the Panalarm Annunciator system

  15. TMACS Test Procedure TP008: SACS Interface. Revision 5

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS SACS Interface functions

  16. TMACS Test Procedure TP010: Integration summary. Revision 5

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The TMACS Soft Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes

  17. Laboratory procedures for waste form testing

    International Nuclear Information System (INIS)

    Mast, E.S.

    1994-01-01

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory

  18. Laboratory procedures for waste form testing

    Energy Technology Data Exchange (ETDEWEB)

    Mast, E.S.

    1994-09-19

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory.

  19. Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer

    International Nuclear Information System (INIS)

    Aftanas, B.L.

    1994-01-01

    This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101-SY pump. This procedure includes: safety check and safety procedures; pre-operation check out; startup; leveling trailer; functional/proofload test; proofload testing; and rolling load test

  20. TMACS test procedure TP010: Integration summary. Revision 6

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure verifies that Test Procedures 1, 2, 3, 5 and 9 (WHC-SD-WM-TRP-105, 106, 107, 109 and 113) of TMACS Software Release 4.1 have been successfully completed

  1. A statistical procedure for testing financial contagion

    Directory of Open Access Journals (Sweden)

    Attilio Gardini

    2013-05-01

    Full Text Available The aim of the paper is to provide an analysis of contagion through the measurement of the risk premia disequilibria dynamics. In order to discriminate among several disequilibrium situations we propose to test contagion on the basis of a two-step procedure: in the first step we estimate the preference parameters of the consumption-based asset pricing model (CCAPM to control for fundamentals and to measure the equilibrium risk premia in different countries; in the second step we measure the differences among empirical risk premia and equilibrium risk premia in order to test cross-country disequilibrium situations due to contagion. Disequilibrium risk premium measures are modelled by the multivariate DCC-GARCH model including a deterministic crisis variable. The model describes simultaneously the risk premia dynamics due to endogenous amplifications of volatility and to exogenous idiosyncratic shocks (contagion, having controlled for fundamentals effects in the first step. Our approach allows us to achieve two goals: (i to identify the disequilibria generated by irrational behaviours of the agents, which cause increasing in volatility that is not explained by the economic fundamentals but is endogenous to financial markets, and (ii to assess the existence of contagion effect defined by exogenous shift in cross-country return correlations during crisis periods. Our results show evidence of contagion from the United States to United Kingdom, Japan, France, and Italy during the financial crisis which started in 2007-08.

  2. Antimicrobial Testing Methods & Procedures Developed by EPA's Microbiology Laboratory

    Science.gov (United States)

    We develop antimicrobial testing methods and standard operating procedures to measure the effectiveness of hard surface disinfectants against a variety of microorganisms. Find methods and procedures for antimicrobial testing.

  3. Enraf Series 854 advanced technology gauge (ATG) acceptance test procedure

    International Nuclear Information System (INIS)

    Huber, J.H.

    1996-01-01

    This Acceptance Test Procedure was written to test the Enraf Series 854 Advanced Technology Gauge (ATG) prior to installation in the Tank Farms. The procedure sets various parameters and verifies that the gauge is functional

  4. Short-Term and Procedural Memory for Colours and Inferior Temporal Cortex Activity

    Directory of Open Access Journals (Sweden)

    E. Castro-Sierra

    1997-01-01

    Full Text Available Two children (male, 10 years, and female, 13 years one month with tumours of the inferior temporal (IT cortex of the brain were studied post-surgically for their abilities to carry out a short-term memory test. This involved: differences in colour, number and shape of small plastic objects; differences in receptacles where these objects should be placed and in ways in which this placement should be done; a procedural task involving differences either in colour or in size of wooden rings employed in the task. Their performances in these tests, and those of patients with tumours of other encephalic areas, were compared with the performances of normal controls. The subjects with IT tumours spent a significantly greater amount of time than normal subjects of their age in carrying out the procedural task involving differences in colour. One of the IT subjects also spent a significantly greater amount of time in the procedural task involving size differences. Other differences in the performances of patients with encephalic tumours and the performances of normal controls were not significant. Results are discussed in relation to findings of colour and size perception and memory localized to the inferior temporal and middle temporal cortices.

  5. Graded changes in enamel component volumes resulted from a short tooth bleaching procedure.

    Science.gov (United States)

    Ferreira, Artemisa Fernanda Moura; Perez, Flávia Maria de Moraes Ramos; Limeira Júnior, Francisco de Assis; de Moura, Mirella de Fátima Liberato; de Sousa, Frederico Barbosa

    2016-05-01

    To test the hypothesis that changes in enamel component volumes (mineral, organic, and water volumes, and permeability) are graded from outer to inner enamel after a short bleaching procedure. Extracted unerupted human third molars had half of their crowns bleached (single bleaching session, 3 × 15 min), and tooth shade changes in bleached parts were analyzed with a spectrophotometer. Ground sections were prepared, component volumes and permeability were quantified at histological points located at varying distances from the enamel surface (n=10 points/location), representing conditions before and after bleaching. Tooth shade changes were significant (pbleaching, except at the outer layers. Multiple analysis of covariances revealed that most of the variance of the change in enamel composition after bleaching was explained by the combination of the set of types of component volume (in decreasing order of relevance: mineral loss, organic gain, water gain, and decrease in permeability) with the set of distances from the enamel surface (graded from the enamel surface inward) (canonical R(2)=0.97; p99%). Changes in enamel composition after a short bleaching procedure followed a gradient within component volumes (mineral loss>organic gain>water gain>decrease in permeability) and decreased from the enamel surface inward. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. GMS/DACS interface acceptance test procedure

    International Nuclear Information System (INIS)

    Zuehlke, A.C.

    1994-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring of existing, and newly installed, instrumentation associated with the SY-101 tank Gas Monitoring Systems will be systematically evaluated by performance of this procedure. All new alarms will be verified to function at the required setpoints. The change of I/O Drop 17 to I/O Drop 13 will be checked to verify that all associated alarms and screen displays are correct. All new or changed Control Screens which provide operator interface with the Gas Monitoring Systems readouts during operations will be verified to be adequate and correct. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tank. These sensors provide information such as: tank vapor space and ventilation system H 2 concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations. The portions of the system to be tested include: new RGA5 gas monitor; existing gas chromatographs; FTIR; B ampersand K (Photo) NH 3 equipment; any new or changed Genesis screens; and I/O Drop 13

  7. TMACS test procedure TP003: Graphics. Revision 5

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays

  8. TMACS test procedure TP001: Alarm management. Revision 6

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the Alarm Management requirements of the TMACS. The features to be tested are: real-time alarming on high and low level and discrete alarms, equipment alarms, dead-band filtering, alarm display color coding, alarm acknowledgement, and alarm logging

  9. TMACS test procedure TP003: Graphics. Revision 6

    International Nuclear Information System (INIS)

    Scanlan, P.K.; Washburn, S.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays

  10. 702AZ aging waste ventilation facility year 2000 test procedure

    International Nuclear Information System (INIS)

    Winkelman, W.D.

    1998-01-01

    This test procedure was developed to determine if the 702AZ Tank Ventilation Facility system is Year 2000 Compliant. The procedure provides detailed instructions for performing the operations necessary and documenting the results. This verification procedure will document that the 702AZ Facility Systems are year 2000 compliant and will correctly meet the criteria established in this procedure

  11. Nutritional effects of the serial transverse enteroplasty procedure in experimental short bowel syndrome

    DEFF Research Database (Denmark)

    Kaji, Tatsuru; Tanaka, Hiroaki; Wallace, Laurie E

    2009-01-01

    The serial transverse enteroplasty (STEP) procedure appears beneficial clinically, but the mechanism(s) underlying these effects remains unclear. The present study evaluated the nutritional, hormonal, and morphologic effects of the STEP procedure in a rodent model of short bowel syndrome....

  12. 40 CFR 89.406 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures. 89.406 Section 89.406 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...

  13. Cloud-based Electronic Test Procedures, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Test procedures are at the heart of any experimental process, especially those involving novel and complex hardware. Whether these procedures are for system...

  14. Improvement of the Original Isolation Procedure for Hormone Studies in Short-Time Culture

    Directory of Open Access Journals (Sweden)

    Mukadder Atmaca

    2005-01-01

    Full Text Available Earlier studies indicated that hormone responsiveness of cells and metabolic activity was lost during various of experimental procedure. In the light of this observation, I aimed to investigate to obtain optimal conditions for short time cultured hepatocytes and also to determine the type of test can be used to evaluate suitablity of hepatocytes for hormones studies. During the isolation period 50 IU/ml and 100 IU/ml collagenase were used. Adrenaline (10-6M was used to measure sensitivity of hepatocytes to hormones and glycogenolsis was measured at the end of 2hr incubation period. Adrenaline significantly increased gylcogenolysis (Control: 0.16±0.01 mg/2hr; Adrenaline: 0.30±0.01 mg/2hr only when the 50 IU/ml collagenase was used and the viability of the cells were over 95%. Viability tests were applied to hepatocytes that obtained by using 50 IU collagenase. Cellular glutathione, methylthiazoltetrazolium reduction, lactatedehdrogenase leakage, ATP level measured to determine viability following the attachment and incubation period. No differences were observed at the end of each period.Altogether, the present study indicated that membrane integrity and metabolic function of the hepatocytes can be improved by modifying slightly the original procedure of Reese and Byard.

  15. Development of an accelerated creep testing procedure for geosynthetics.

    Science.gov (United States)

    1997-09-01

    The report presents a procedure for predicting creep strains of geosynthetics using creep tests at elevated temperatures. Creep testing equipment was constructed and tests were performed on two types of geosynthetics: High Density Polyethylene (HDPE)...

  16. Analysis and optimization of blood-testing procedures.

    NARCIS (Netherlands)

    Bar-Lev, S.K.; Boxma, O.J.; Perry, D.; Vastazos, L.P.

    2017-01-01

    This paper is devoted to the performance analysis and optimization of blood testing procedures. We present a queueing model of two queues in series, representing the two stages of a blood-testing procedure. Service (testing) in stage 1 is performed in batches, whereas it is done individually in

  17. Testing for Short Memory in a VARMA Process

    OpenAIRE

    Oke, Timothy; Öller, Lars-Erik

    1997-01-01

    We generalize the short term memory test of an ARMA model, presented in Öller (1985), to the multivariate VARMA cases. In a study on Swedish exports and OECD demand we demonstrate how the multivariate setting extends the short memory.

  18. Test procedure for boxed waste assay system

    International Nuclear Information System (INIS)

    Wachter, J.

    1994-01-01

    This document, prepared by Los Alamos National Laboratory's NMT-4 group, details the test methodology and requirements for Acceptance/Qualification testing of a Boxed Waste Assay System (BWAS) designed and constructed by Pajarito Scientific Corporation. Testing of the BWAS at the Plutonium Facility (TA55) at Los Alamos National Laboratory will be performed to ascertain system adherence to procurement specification requirements. The test program shall include demonstration of conveyor handling capabilities, gamma ray energy analysis, and imaging passive/active neutron accuracy and sensitivity. Integral to these functions is the system's embedded operating and data reduction software

  19. TMACS test procedure TP012: Panalarm software bridge

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    This Test Procedure addresses the testing of the functionality of the Tank Monitor and Control System (TMACS) Panalarm bridge software. The features to be tested are: Bridge Initialization Options; Bridge Communication; Bridge Performance; Testing Checksum Errors; and Testing Command Reject Errors. Only the first three could be tested; the last two have been deferred to a later date

  20. 16 CFR 1610.6 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ... dimension of the specimen and arranged so the test flame impinges on a metallic thread. (iv) Embroidery. Embroidery on netting material shall be tested with two sets of preliminary specimens to determine the most flammable area (which offers the greatest amount of netting or embroidery in the 150 mm (6 in.) direction...

  1. Some procedures for computerized ability testing

    NARCIS (Netherlands)

    van der Linden, Willem J.; Zwarts, Michel A.

    1989-01-01

    For computerized test systems to be operational, the use of item response theory is a prerequisite. As opposed to classical test theory, in item response models the abilities of the examinees and the properties of the items are parameterized separately. Hence, when measuring the abilities of

  2. 16 CFR 1630.4 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ...) Test chamber. The test chamber shall consist of an open top hollow cube made of noncombustible material...) Gloves. Nonhygroscopic gloves (such as rubber polyethylene) for handling the sample after drying, and... in the draft-protected environment (hood with draft off) with its bottom in place. Wearing gloves...

  3. Void fraction instrument acceptance test procedure

    International Nuclear Information System (INIS)

    Stokes, T.I.; Pearce, K.L.

    1994-01-01

    This document presents the results of the acceptance test for the mechanical and electrical features (not specifically addressed by the software ATP) of the void fraction instrument (VFI). Acceptance testing of the VFI, control console, and decontamination spray assembly was conducted in the 306E building high bay and area adjacent to the facility. The VFI was tested in the horizontal position supported in multiple locations on rolling tables. The control console was located next to the VFI pneumatic control assembly. The VFI system was operated exactly as is expected in the tank farm, with the following exceptions: power was provided from a building outlet and the VFI was horizontal. The testing described in this document verifies that the mechanical and electrical features are operating as designed and that the unit is ready for field service

  4. Gas characterization system software acceptance test procedure

    International Nuclear Information System (INIS)

    Vo, C.V.

    1996-01-01

    This document details the Software Acceptance Testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases

  5. Summary of functional and performance test procedures

    DEFF Research Database (Denmark)

    Mitzel, Jens; Gülzow, Erich; Friedrich, K. Andreas

    Different Test Modules (TM) are defined for the functional and performance characterization of a PEMFC stack. The master document TM2.00 defines requirements and methodology for parameter variation, stability and data acquisition.......Different Test Modules (TM) are defined for the functional and performance characterization of a PEMFC stack. The master document TM2.00 defines requirements and methodology for parameter variation, stability and data acquisition....

  6. 49 CFR 572.144 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ...-year-Old Child Crash Test Dummy, Alpha Version § 572.144 Thorax assembly and test procedure. (a) Thorax... displacement (compression) relative to the spine, measured with the chest deflection transducer (SA-572-S50...

  7. 49 CFR 572.164 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.164 Thorax assembly and test procedure. (a... specified in 49 CFR 572.124(c): (1) The maximum sternum displacement relative to the spine, measured with...

  8. Cloud-Based Electronic Test Procedures, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Procedures are critical to experimental tests as they describe the specific steps necessary to efficiently and safely carry out a test in a repeatable fashion. The...

  9. Standard Ship Test and Inspection Plan, Procedures and Database

    National Research Council Canada - National Science Library

    1999-01-01

    ... construction schedules and increased cost is the area of test and inspection. This project investigates existing rules and regulations for testing and inspection of commercial ships and identifies differences and similarities within the requirements. The results include comparison matrices, a standard test plan, a set of standard test procedures, and a sample test database developed for a typical commercial ship.

  10. Test procedure forms for sludge retrieval and packaging

    International Nuclear Information System (INIS)

    Feigenbutz, L.V.

    1994-01-01

    This document provides test procedure forms for sludge retrieval and packaging tests in the 305 Cold Test Facility. The completed and approved forms provide all descriptions, criteria and analysis to safely perform sludge equipment tests in the 305 Cold Test Facility

  11. 16 CFR 1615.4 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ... Product Safety Commission. (e) Specimens and Sampling—Compliance Market Sampling Plan. Sampling plans for use in market testing of items covered by this Standard may be issued by the Consumer Product Safety... Park, North Carolina 27709. This document is also available for inspection at the National Archives and...

  12. 40 CFR 91.607 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... weekends or holidays. (iii) If the manufacturer's service or target is less than the minimum rate specified... target. (3) Service accumulation must be completed on a sufficient number of test engines during... nonroad engine sales for the United States market for the applicable year of 7,500 or greater must...

  13. 16 CFR 1201.4 - Test procedures.

    Science.gov (United States)

    2010-01-01

    ... specimens—(i) Boil test. Three pieces 12 inches by 12 inches (30 centimeters by 30 centimeters) with nominal...) [Reserved] (B) Organic-coated glass—(1) Orientation specified. Six organic-coated glass specimens 2 inches... thickness, six specimens may be used. (iii) Indoor service. Four additional samples identical to those...

  14. 40 CFR 63.309 - Performance tests and procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Performance tests and procedures. 63.309 Section 63.309 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Standards for Coke Oven Batteries § 63.309 Performance tests and procedures. (a) Except as otherwise...

  15. Acceptance test procedure: RMW Land Disposal Facility Project W-025

    International Nuclear Information System (INIS)

    Roscha, V.

    1994-01-01

    This ATP establishes field testing procedures to demonstrate that the electrical/instrumentation system functions as intended by design for the Radioactive Mixed Waste Land Disposal Facility. Procedures are outlined for the field testing of the following: electrical heat trace system; transducers and meter/controllers; pumps; leachate storage tank; and building power and lighting

  16. Standard Operating Procedure for Accelerated Corrosion Testing at ARL

    Science.gov (United States)

    2017-11-01

    ARL-TN-0855 ● NOV 2017 US Army Research Laboratory Standard Operating Procedure for Accelerated Corrosion Testing at ARL by... Corrosion Testing at ARL by Thomas A Considine Weapons and Materials Research Directorate, ARL Approved for public...November 2017 2. REPORT TYPE Technical Note 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Standard Operating Procedure for Accelerated

  17. 40 CFR 76.15 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a) The...

  18. Test procedure for cation exchange chromatography

    International Nuclear Information System (INIS)

    Cooper, T.D.

    1994-01-01

    The purpose of this test plan is to demonstrate the synthesis of inorganic antimonate ion exchangers and compare their performance against the standard organic cation exchangers. Of particular interest is the degradation rate of both inorganic and organic cation exchangers. This degradation rate will be tracked by determining the ion exchange capacity and thermal stability as a function of time, radiation dose, and chemical reaction

  19. Sequential test procedures for inventory differences

    International Nuclear Information System (INIS)

    Goldman, A.S.; Kern, E.A.; Emeigh, C.W.

    1985-01-01

    By means of a simulation study, we investigated the appropriateness of Page's and power-one sequential tests on sequences of inventory differences obtained from an example materials control unit, a sub-area of a hypothetical UF 6 -to-U 3 O 8 conversion process. The study examined detection probability and run length curves obtained from different loss scenarios. 12 refs., 10 figs., 2 tabs

  20. A new approach to household appliance energy test procedures

    Energy Technology Data Exchange (ETDEWEB)

    Ernebrant, S.; Wihlborg, M.

    1999-03-01

    Energy test procedures provides the industry with a method to measure its products energy consumption. The energy test procedures are the technical foundation to every energy standard and labelling system. Depending on which country the product is going to be sold in, the manufacturers must follow different standards. This report concentrates on appliance test procedures, with the main focus on refrigerators. Recently, a new technology -microcontrollers- is undermining the credibility of the test procedures. New features, saving energy in real-life, are not picked up by the test procedures. It is estimated that as much as 30% of energy could be saved with this technology. Microcontrollers have also led to the possibility to circumvent tests. A new model is presented in the report, which handles these energy savings and make it harder cheating on tests. The model divides the test procedure in two parts; hardware tests and software tests, and uses a Matlab/Simulink computer model to calculate the energy consumption. Examples of hardware- and software test methods for refrigerators are described. A refrigerator is used as an example to present the model. The possibility to harmonize the energy standards to one global standard, which could mean substantial savings and make international trade more efficient, is also discussed 24 refs, 30 figs. Examination paper

  1. Surface moisture measurement system hardware acceptance test procedure

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    The purpose of this acceptance test procedure is to verify that the mechanical and electrical features of the Surface Moisture Measurement System are operating as designed and that the unit is ready for field service. This procedure will be used in conjunction with a software acceptance test procedure, which addresses testing of software and electrical features not addressed in this document. Hardware testing will be performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  2. Stylistic features of narrative procedure in a psychological short story in the context of teaching interpretation

    Directory of Open Access Journals (Sweden)

    Stakić Mirjana M.

    2016-01-01

    Full Text Available The paper investigates the stylistic features of narrative procedure in a psychological short story in the context of its interpretation in the teaching of the Serbian language and literature. The narrative procedure in a psychological short story is characterized by the use of the first person in narrating, that is I form, an interior monologue and direct interior monologue, dreams, oversights and introspective. It is also characterized by a particular sentence structure, of often incomplete and elliptical form, used to express the conflicts going on in characters' inner sphere and verbal interaction between the characters. The narrative procedure applied in a psychological short story indicates that its plot is subdued to the internal psychological experiences. During the interpretation of a psychological short story students, through the interpretation of stylistic and narrative procedures, are directed and encouraged to discover complex and often hidden psychological mechanisms which spur the characters to act, influence their behavior, verbal expression and mutual relations. The interpretation of language signs which may have psychological and semantic potential leads to the revealing of unconscious internal psychological processes and mechanisms which take place within a literary character.

  3. Report on COTECH test procedure and characterization techniques

    DEFF Research Database (Denmark)

    Islam, Mohammad Aminul

    that need to be attained for successful characterization of the planned demonstrators and it deals with the material characterization and prototype testing for the COTECH demonstrators. The summary of this report includes:  General description of COTECH industrial demonstrators  COTECH materials...... and material characterization techniques  Characterization techniques of the COTECH demonstrators  Functionality and lifecycle testing of the COTECH demonstrators Besides the general introduction and conclusion each section of the report is dedicated to the characterization techniques and test procedure.......Characterization techniques and test procedure requirements for innovative self-ligating dental brackets (EO) Section 5.Characterization techniques and test procedure requirements for smart diagnostic chips comprising a microfluidic channel system (GBO) Section 6.Characterization techniques and test procedure...

  4. Quality assurance of radiopharmaceuticals-specifications and test procedures

    International Nuclear Information System (INIS)

    Baldas, J.; Bonnyman, J.; Pojer, P.M.

    1981-08-01

    This report is a compilation of test methods used and specifications adopted for the Radiopharmaceutical Quality Assurance Test Programme conducted by the Australian Radiation Laboratory. In some cases test procedures described have been taken from various Pharmacopoeias or methods published in the literature. In other cases test methods have been developed at the ARL

  5. Electrical short circuit and current overload tests on aircraft wiring

    Science.gov (United States)

    Cahill, Patricia

    1995-01-01

    The findings of electrical short circuit and current overload tests performed on commercial aircraft wiring are presented. A series of bench-scale tests were conducted to evaluate circuit breaker response to overcurrent and to determine if the wire showed any visible signs of thermal degradation due to overcurrent. Three types of wire used in commercial aircraft were evaluated: MIL-W-22759/34 (150 C rated), MIL-W-81381/12 (200 C rated), and BMS 1360 (260 C rated). A second series of tests evaluated circuit breaker response to short circuits and ticking faults. These tests were also meant to determine if the three test wires behaved differently under these conditions and if a short circuit or ticking fault could start a fire. It is concluded that circuit breakers provided reliable overcurrent protection. Circuit breakers may not protect wire from ticking faults but can protect wire from direct shorts. These tests indicated that the appearance of a wire subjected to a current that totally degrades the insulation looks identical to a wire subjected to a fire; however the 'fire exposed' conductor was more brittle than the conductor degraded by overcurrent. Preliminary testing indicates that direct short circuits are not likely to start a fire. Preliminary testing indicated that direct short circuits do not erode insulation and conductor to the extent that ticking faults did. Circuit breakers may not safeguard against the ignition of flammable materials by ticking faults. The flammability of materials near ticking faults is far more important than the rating of the wire insulation material.

  6. New energy test procedures for refrigerators and other appliances; FINAL

    International Nuclear Information System (INIS)

    Meier, Alan; Ernebrant, Stefan; Kawamoto, Kaoru; Wihlborg, Mats

    1999-01-01

    Many innovations in refrigerator design rely on microprocessors, sensors, and algorithms to control automatic defrost, variable speed,and other features. Even though these features strongly influence energy consumption, the major energy test procedures presently test only a refrigerator's mechanical efficiency and ignore the ''software'' aspects. We describe a new test procedure where both ''hardware'' and ''software'' tests are fed into a dynamic simulation model. A wide range of conditions can be tested and simulated. This approach promotes international harmonization because the simulation model can also be programmed to estimate energy use for the ISO, DOE, or JIS test. The approach outlined for refrigerators can also be applied to other appliances

  7. Biaxial testing for fabrics and foils optimizing devices and procedures

    CERN Document Server

    Beccarelli, Paolo

    2015-01-01

    This book offers a well-structured, critical review of current design practice for tensioned membrane structures, including a detailed analysis of the experimental data required and critical issues relating to the lack of a set of design codes and testing procedures. The technical requirements for biaxial testing equipment are analyzed in detail, and aspects that need to be considered when developing biaxial testing procedures are emphasized. The analysis is supported by the results of a round-robin exercise comparing biaxial testing machines that involved four of the main research laboratories in the field. The biaxial testing devices and procedures presently used in Europe are extensively discussed, and information is provided on the design and implementation of a biaxial testing rig for architectural fabrics at Politecnico di Milano, which represents a benchmark in the field. The significance of the most recent developments in biaxial testing is also explored.

  8. Empirical versus Random Item Selection in the Design of Intelligence Test Short Forms--The WISC-R Example.

    Science.gov (United States)

    Goh, David S.

    1979-01-01

    The advantages of using psychometric thoery to design short forms of intelligence tests are demonstrated by comparing such usage to a systematic random procedure that has previously been used. The Wechsler Intelligence Scale for Children Revised (WISC-R) Short Form is presented as an example. (JKS)

  9. Vehicle accelerated corrosion test procedures for automotive in Malaysia

    Directory of Open Access Journals (Sweden)

    Anuar Liza

    2017-01-01

    Full Text Available An accelerated corrosion test, known as proving ground accelerated test, is commonly performed by automotive manufacturers to evaluate the corrosion performance of a vehicle. The test combines corrosion and durability inputs to detect potential failures that may occur during in-service conditions. Currently, the test is conducted at an external test center overseas. Such test is aimed to simulate the effects of one year accelerated corrosion in severe corrosive environment of the north-east and south east of America. However, the test results obtained do not correlate with the actual corrosion conditions observed in the Malaysian market, which is likely attributed to the different test environment of the tropical climate of vehicles in service. Therefore, a vehicle accelerated corrosion test procedure that suits the Malaysian market is proposed and benchmarked with other global car manufacturers that have their own dedicated corrosion test procedure. In the present work, a test track is used as the corrosion test ground and consists of various types of roads for structural durability exposures. Corrosion related facilities like salt trough, mud trough and gravel road are constructed as addition to the existing facilities. The establishment of accelerated corrosion test facilities has contributed to the development of initial accelerated corrosion test procedure for the national car manufacturer. The corrosion exposure is monitored by fitting test coupons at the underbody of test vehicle using mass loss technique so that the desired corrosion rate capable of simulating the real time corrosion effects for its target market.

  10. 40 CFR 600.111-08 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... § 600.109(b) while sampling the exhaust gas. (viii) Sampling must begin two seconds before beginning the... convenience of the user, the revised text is set forth as follows: § 600.111-08 Test procedures. (f) Special...

  11. Test Procedure - pumping system for caustic addition project

    International Nuclear Information System (INIS)

    Leshikar, G.A.

    1994-01-01

    This test procedure provides the requirements for sub-system testing and integrated operational testing of the submersible mixer pump and caustic addition equipment by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  12. Specifications for Testing Procedures at Svåheia

    DEFF Research Database (Denmark)

    Margheritini, Lucia; Kofoed, Jens Peter

    This report is realized in order to define testing procedures of the SSG pilot in Svåheia location. This will be done by listing all the relevant parameters related to the structure performance.......This report is realized in order to define testing procedures of the SSG pilot in Svåheia location. This will be done by listing all the relevant parameters related to the structure performance....

  13. CEL Working procedures for WRAP 2A formulation development test

    International Nuclear Information System (INIS)

    Duchsherer, M.J.

    1994-01-01

    The WRAP 2A facility will encapsulate retrieved, stored, and newly generated contact-handled mixed low level waste (MLLW) into 55-500 gal cementitous forms. Standardized test procedures will be required to facilitate this process. Cementitous specimens will be prepared from simulated drum wastes and will be tested in the Chemical Engineering Laboratory using the laboratory operating/working procedures encorporated into this document

  14. Simple and reliable procedure for the evaluation of short-term dynamic processes in power systems

    Energy Technology Data Exchange (ETDEWEB)

    Popovic, D P

    1986-10-01

    An efficient approach is presented to the solution of the short-term dynamics model in power systems. It consists of an adequate algebraic treatment of the original system of nonlinear differential equations, using linearization, decomposition and Cauchy's formula. The simple difference equations obtained in this way are incorporated into a model of the electrical network, which is of a low order compared to the ones usually used. Newton's method is applied to the model formed in this way, which leads to a simple and reliable iterative procedure. The characteristics of the procedure developed are demonstrated on examples of transient stability analysis of real power systems. 12 refs.

  15. Corrosion performance tests for reinforcing steel in concrete : test procedures.

    Science.gov (United States)

    2009-09-01

    The existing test method to assess the corrosion performance of reinforcing steel embedded in concrete, mainly : ASTM G109, is labor intensive, time consuming, slow to provide comparative results, and often expensive. : However, corrosion of reinforc...

  16. Short- and long-term effects of clinical audits on compliance with procedures in CT scanning.

    Science.gov (United States)

    Oliveri, Antonio; Howarth, Nigel; Gevenois, Pierre Alain; Tack, Denis

    2016-08-01

    To test the hypothesis that quality clinical audits improve compliance with the procedures in computed tomography (CT) scanning. This retrospective study was conducted in two hospitals, based on 6950 examinations and four procedures, focusing on the acquisition length in lumbar spine CT, the default tube current applied in abdominal un-enhanced CT, the tube potential selection for portal phase abdominal CT and the use of a specific "paediatric brain CT" procedure. The first clinical audit reported compliance with these procedures. After presenting the results to the stakeholders, a second audit was conducted to measure the impact of this information on compliance and was repeated the next year. Comparisons of proportions were performed using the Chi-square Pearson test. Depending on the procedure, the compliance rate ranged from 27 to 88 % during the first audit. After presentation of the audit results to the stakeholders, the compliance rate ranged from 68 to 93 % and was significantly improved for all procedures (P ranging from audit (P ranging from 0.114 to 0.999). Quality improvement through repeated compliance audits with CT procedures durably improves this compliance. • Compliance with CT procedures is operator-dependent and not perfect. • Compliance differs between procedures and hospitals, even within a unified department. • Compliance is improved through audits followed by communication to the stakeholders. • This improvement is sustainable over a one-year period.

  17. Gas temperature measurements in short duration turbomachinery test facilities

    Science.gov (United States)

    Cattafesta, L. N.; Epstein, A. H.

    1988-07-01

    Thermocouple rakes for use in short-duration turbomachinery test facilities have been developed using very fine thermocouples. Geometry variations were parametrically tested and showed that bare quartz junction supports (76 microns in diameter) yielded superior performance, and were rugged enough to survive considerable impact damage. Using very low cost signal conditioning electronics, temperature accuracies of 0.3 percent were realized yielding turbine efficiency measurements at the 1-percent level. Ongoing work to improve this accuracy is described.

  18. 40 CFR Appendix I to Subpart V of... - Recommended Test Procedures and Test Criteria and Recommended Durability Procedures To...

    Science.gov (United States)

    2010-07-01

    ... closing temperature shall be measured on an increasing temperature change. C. Carburetor Accelerator Pumps.... Reserved for Camshafts N. Reserved for Pistons O. Oxidizing Catalytic Converters 1. Test Procedures and...

  19. Test Operations Procedure (TOP) 06-2-301 Wind Testing

    Science.gov (United States)

    2017-06-14

    The wind direction should be perpendicular to the faces selected for exposure. If testing is performed outdoors, cross winds can change the wind...14 June 2017 4 b. The item geometry will influence the requirements for the wind direction tolerance. For example , if the item is symmetrical...3 3.2 Wind Direction

  20. Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101 Flexible Receiver System, Phase III Testing. This procedure will test the sealing integrity of the Flexible Receiver System to ensure that release of waste and aerosols will be minimized during the removal of the test mixer pump from tank SY-101

  1. Test equality between two binary screening tests with a confirmatory procedure restricted on screen positives.

    Science.gov (United States)

    Lui, Kung-Jong; Chang, Kuang-Chao

    2015-01-01

    In studies of screening accuracy, we may commonly encounter the data in which a confirmatory procedure is administered to only those subjects with screen positives for ethical concerns. We focus our discussion on simultaneously testing equality of sensitivity and specificity between two binary screening tests when only subjects with screen positives receive the confirmatory procedure. We develop four asymptotic test procedures and one exact test procedure. We derive sample size calculation formula for a desired power of detecting a difference at a given nominal [Formula: see text]-level. We employ Monte Carlo simulation to evaluate the performance of these test procedures and the accuracy of the sample size calculation formula developed here in a variety of situations. Finally, we use the data obtained from a study of the prostate-specific-antigen test and digital rectal examination test on 949 Black men to illustrate the practical use of these test procedures and the sample size calculation formula.

  2. The influence of different measurement structures on NRTA test procedures

    International Nuclear Information System (INIS)

    Beedgen, R.

    1986-01-01

    The development of sequential statistical test procedures in the area of near real time material accountancy (NRTA) mostly assumed a fixed measurement model of a given model facility. In this paper different measurement models (dispersion matrices) for a sequence of balance periods are studied. They are used to compare the detection probabilities of three different sequential test procedures for losses of material. It is shown how different plant models have an influence on the sensitivity of specified tests. Great importance for that analysis have the optimal loss patterns in each measurement situation

  3. Operational test procedure for SY tank farm replacement exhauster unit

    International Nuclear Information System (INIS)

    McClees, J.

    1995-01-01

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly

  4. Procedures for Selecting Items for Computerized Adaptive Tests.

    Science.gov (United States)

    Kingsbury, G. Gage; Zara, Anthony R.

    1989-01-01

    Several classical approaches and alternative approaches to item selection for computerized adaptive testing (CAT) are reviewed and compared. The study also describes procedures for constrained CAT that may be added to classical item selection approaches to allow them to be used for applied testing. (TJH)

  5. AP-102/104 Retrieval control system qualification test procedure

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents

  6. European wind turbine procedure development blade test methods and techniques

    Energy Technology Data Exchange (ETDEWEB)

    Bulder, B H; Dam, J J.D. van; Delft, D R.V. van [and others

    1999-03-01

    In this paper the preliminary results obtained by performing the second task of the `European Wind Turbine Testing Procedure Development` project are presented. This project is performed within and with financial support of the Standards, Measurements and Testing programme of the European Commission. (au)

  7. 40 CFR 205.57-4 - Testing procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Testing procedures. 205.57-4 Section 205.57-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.57-4 Testing...

  8. 16 CFR 1209.7 - Test procedures for smoldering combustion.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for smoldering combustion. 1209.7 Section 1209.7 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY... for smoldering combustion. This section provides the test method for determining smoldering combustion...

  9. Developing a Cloze Procedure as a Reading Comprehension Achievement Test

    Directory of Open Access Journals (Sweden)

    I Ketut Seken

    2004-01-01

    Full Text Available The project was concerned with developing a cloze procedure as a reading comprehension achievement test. The subjects were students of the English Department of the Faculty of Letters, State University of Malang, who were halfway in the semester to complete Reading II course. The test was planned and constructed on the foundation of existing theory of cloze test construction. A review of theory concerning reading comprehension, testing reading comprehension, and cloze testing led to the construction of the test, including the decision concerning how to score the test and to interpret the scores. Using a class of 28 students, the test was tried out a week after the mid-semester test was administered by the Reading II teacher. It was found that the test is sufficienty reliable on the basis of a reliability coefficient of .79 through split-half procedure and a coefficient value of .78 by K-R 20. The test also showed high inter-section correlation. The validity of the test was viewed in terms of face, content, and construct. The test scores correlate moderately with those obtained from the mid-semester test by the teacher. Some problems are discussed and a suggestion made with regard to a possible solution to these problems.

  10. Short- and long-term effects of clinical audits on compliance with procedures in CT scanning

    International Nuclear Information System (INIS)

    Oliveri, Antonio; Howarth, Nigel; Gevenois, Pierre Alain; Tack, Denis

    2016-01-01

    To test the hypothesis that quality clinical audits improve compliance with the procedures in computed tomography (CT) scanning. This retrospective study was conducted in two hospitals, based on 6950 examinations and four procedures, focusing on the acquisition length in lumbar spine CT, the default tube current applied in abdominal un-enhanced CT, the tube potential selection for portal phase abdominal CT and the use of a specific ''paediatric brain CT'' procedure. The first clinical audit reported compliance with these procedures. After presenting the results to the stakeholders, a second audit was conducted to measure the impact of this information on compliance and was repeated the next year. Comparisons of proportions were performed using the Chi-square Pearson test. Depending on the procedure, the compliance rate ranged from 27 to 88 % during the first audit. After presentation of the audit results to the stakeholders, the compliance rate ranged from 68 to 93 % and was significantly improved for all procedures (P ranging from <0.001 to 0.031) in both hospitals and remained unchanged during the third audit (P ranging from 0.114 to 0.999). Quality improvement through repeated compliance audits with CT procedures durably improves this compliance. (orig.)

  11. ENRAF Series 854 Advanced Technology Gauge (ATG) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    HUBER, J.H.

    1999-01-01

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area. This ATP does not set up the gauge for any specific tank, but is generalized to permit testing the gauge prior to installation package preparation

  12. Operability test procedure [Tank] 241-SY-101 equipment removal system

    International Nuclear Information System (INIS)

    Mast, J.C.

    1994-01-01

    The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation

  13. European wind turbine testing procedure developments. Task 2: Power quality

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Friis Pedersen, Troels; Gerdes, G.

    2001-01-01

    The present report describes the work done in the power quality subtask of the European Wind Turbine Testing Procedure Developments project funded by the EU SMT program. The objective of the power quality subtask has been to make recommendations andprovide background for new standards...... for measurement and testing of wind turbine power quality. The focus in the work has been to support the ongoing standardisation work in IEC with a new standard IEC61400-21 for measurement and assessment of powerquality characteristics of grid connected wind turbines. The work has also been based on the power...... quality measuremnet procedure in the Measnet cooperation of European test stations for wind turbines. The first working item of the project has been toverify the state of the art of the measurement procedures by analyses and comparisons of the measurements and data processing software of the participating...

  14. X-ray testing for short-time dynamic applications

    International Nuclear Information System (INIS)

    Kurfiss, Malte; Moser, Stefan; Popko, Gregor; Nau, Siegfried

    2017-01-01

    For nondestructive testing purposes new challenges are short-time dynamic processes. The application of x-ray flash tubes and modern high-speed cameras allows the observation of the opening of air-bags or the energy absorption of compressed tubes as occurring during a vehicle crash. Special algorithms designed for computerized tomography analyses allow the 3D reconstruction at individual time points of the dynamic process. Possibilities and limitations of the actual techniques are discussed.

  15. Vietnamese validation of the short version of Internet Addiction Test

    OpenAIRE

    Tran, Bach Xuan; Mai, Hue Thi; Nguyen, Long Hoang; Nguyen, Cuong Tat; Latkin, Carl A.; Zhang, Melvyn W.B.; Ho, Roger C.M.

    2017-01-01

    Background and aims: The main goal of the present study was to examine the psychometric properties of a Vietnamese version of the short-version of Internet Addiction Test (s-IAT) and to assess the relationship between s-IAT scores and demographics, health related qualify of life and perceived stress scores in young Vietnamese. Methods: The Vietnamese version of s-IAT was administered to a sample of 589 participants. Exploratory factor and reliability analyses were performed. Regression analys...

  16. Empirical testing of forecast update procedure forseasonal products

    DEFF Research Database (Denmark)

    Wong, Chee Yew; Johansen, John

    2008-01-01

    Updating of forecasts is essential for successful collaborative forecasting, especially for seasonal products. This paper discusses the results of a theoretical simulation and an empirical test of a proposed time-series forecast updating procedure. It involves a two-stage longitudinal case study...... of a toy supply chain. The theoretical simulation involves historical weekly consumer demand data for 122 toy products. The empirical test is then carried out in real-time with 291 toy products. The results show that the proposed forecast updating procedure: 1) reduced forecast errors of the annual...... provided less forecast accuracy improvement and it needed a longer time to achieve relatively acceptable forecast uncertainty....

  17. Acceptance test procedure for High Pressure Water Jet System

    International Nuclear Information System (INIS)

    Crystal, J.B.

    1995-01-01

    The overall objective of the acceptance test is to demonstrate a combined system. This includes associated tools and equipment necessary to perform cleaning in the 105 K East Basin (KE) for achieving optimum reduction in the level of contamination/dose rate on canisters prior to removal from the KE Basin and subsequent packaging for disposal. Acceptance tests shall include necessary hardware to achieve acceptance of the cleaning phase of canisters. This acceptance test procedure will define the acceptance testing criteria of the high pressure water jet cleaning fixture. The focus of this procedure will be to provide guidelines and instructions to control, evaluate and document the acceptance testing for cleaning effectiveness and method(s) of removing the contaminated surface layer from the canister presently identified in KE Basin. Additionally, the desired result of the acceptance test will be to deliver to K Basins a thoroughly tested and proven system for underwater decontamination and dose reduction. This report discusses the acceptance test procedure for the High Pressure Water Jet

  18. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    International Nuclear Information System (INIS)

    WHITE, D.A.

    2000-01-01

    Shop test of the sludge mobilization cart system to be used in the AZ-101 Mixer Pump Demonstration Test Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software

  19. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    International Nuclear Information System (INIS)

    WHITE, D.A.

    2000-01-01

    Shop Test of the Gamma Cart System to be used in the AZ-101 Mixer Pump Demonstration Test. Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including: depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software

  20. Short bowel mucosal morphology, proliferation and inflammation at first and repeat STEP procedures.

    Science.gov (United States)

    Mutanen, Annika; Barrett, Meredith; Feng, Yongjia; Lohi, Jouko; Rabah, Raja; Teitelbaum, Daniel H; Pakarinen, Mikko P

    2018-04-17

    Although serial transverse enteroplasty (STEP) improves function of dilated short bowel, a significant proportion of patients require repeat surgery. To address underlying reasons for unsuccessful STEP, we compared small intestinal mucosal characteristics between initial and repeat STEP procedures in children with short bowel syndrome (SBS). Fifteen SBS children, who underwent 13 first and 7 repeat STEP procedures with full thickness small bowel samples at median age 1.5 years (IQR 0.7-3.7) were included. The specimens were analyzed histologically for mucosal morphology, inflammation and muscular thickness. Mucosal proliferation and apoptosis was analyzed with MIB1 and Tunel immunohistochemistry. Median small bowel length increased 42% by initial STEP and 13% by repeat STEP (p=0.05), while enteral caloric intake increased from 6% to 36% (p=0.07) during 14 (12-42) months between the procedures. Abnormal mucosal inflammation was frequently observed both at initial (69%) and additional STEP (86%, p=0.52) surgery. Villus height, crypt depth, enterocyte proliferation and apoptosis as well as muscular thickness were comparable at first and repeat STEP (p>0.05 for all). Patients, who required repeat STEP tended to be younger (p=0.057) with less apoptotic crypt cells (p=0.031) at first STEP. Absence of ileocecal valve associated with increased intraepithelial leukocyte count and reduced crypt cell proliferation index (pSTEP. Persistent inflammation and lacking mucosal growth may contribute to continuing bowel dysfunction in SBS children, who require repeat STEP procedure, especially after removal of the ileocecal valve. Level IV, retrospective study. Copyright © 2018 Elsevier Inc. All rights reserved.

  1. Statistical approach for collaborative tests, reference material certification procedures

    International Nuclear Information System (INIS)

    Fangmeyer, H.; Haemers, L.; Larisse, J.

    1977-01-01

    The first part introduces the different aspects in organizing and executing intercomparison tests of chemical or physical quantities. It follows a description of a statistical procedure to handle the data collected in a circular analysis. Finally, an example demonstrates how the tool can be applied and which conclusion can be drawn of the results obtained

  2. 49 CFR 572.124 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... test procedure in paragraph (c) of this section: (1) The maximum sternum displacement (compression... displacement but before reaching the minimum required 38.0 mm (1.5 in) sternum displacement limit shall not exceed 1500 N (337.2 lbf). (2) The internal hysteresis of the ribcage in each impact as determined by the...

  3. Testing the applicability of the SASS5 scoring procedure for ...

    African Journals Online (AJOL)

    A study was undertaken between 29th January and 17th February 2004 to test the applicability of the South African Scoring System Version 5 (SASS5) scoring and calculation procedure in nutrient-enriched palustrine wetlands in the midlands of KwaZulu-Natal, South Africa. Four reference wetlands and three dairy-effluent ...

  4. Operating experience and procedures at the tritium systems test assembly

    International Nuclear Information System (INIS)

    Carlson, R.V.; Binning, K.E.; Cole, S.P.; Jenkins, E.M.; Wilhelm, R.C.; Cole, S.P.

    1988-01-01

    Operating procedures are important for the safe and efficient operation of the Tritium Systems Test Assembly (TSTA). TSTA has been operating for four years with tritium in a safe and efficient manner. The inventory of tritium in the process loop is 100 grams and several milestone runs have been completed. This paper describes the methods used to operate TSTA. 3 refs., 1 fig

  5. 16 CFR 1501.4 - Size requirements and test procedure.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Size requirements and test procedure. 1501.4 Section 1501.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION FEDERAL HAZARDOUS SUBSTANCES ACT.... The metric approximations are included only for convenience.) (b)(1) Place the article, without...

  6. 40 CFR 86.227-94 - Test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Test procedures; overview. 86.227-94 Section 86.227-94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... 1994 and Later Model Year Gasoline-Fueled New Light-Duty Vehicles, New Light-Duty Trucks and New Medium...

  7. 40 CFR 92.123 - Test procedure; general requirements.

    Science.gov (United States)

    2010-07-01

    ... the test. Auxiliary fan(s) may be used to maintain engine cooling during operation on the dynamometer... smoke. (1) In the raw exhaust sampling procedure, sample is collected directly from the exhaust stream... of another raw exhaust sample. The fuel flow rate for each throttle setting is measured. (2) For...

  8. 40 CFR 86.1527 - Idle test procedure; overview.

    Science.gov (United States)

    2010-07-01

    ... from a single exhaust pipe in which exhaust products are homogeneously mixed. The configuration for... additional “Y” pipe be placed in the exhaust system before dilution. [48 FR 52252, Nov. 16, 1983... determine the raw concentration (in percent) of CO in the exhaust flow at idle. The test procedure begins...

  9. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays

  10. Prospective testing of Coulomb short-term earthquake forecasts

    Science.gov (United States)

    Jackson, D. D.; Kagan, Y. Y.; Schorlemmer, D.; Zechar, J. D.; Wang, Q.; Wong, K.

    2009-12-01

    Earthquake induced Coulomb stresses, whether static or dynamic, suddenly change the probability of future earthquakes. Models to estimate stress and the resulting seismicity changes could help to illuminate earthquake physics and guide appropriate precautionary response. But do these models have improved forecasting power compared to empirical statistical models? The best answer lies in prospective testing in which a fully specified model, with no subsequent parameter adjustments, is evaluated against future earthquakes. The Center of Study of Earthquake Predictability (CSEP) facilitates such prospective testing of earthquake forecasts, including several short term forecasts. Formulating Coulomb stress models for formal testing involves several practical problems, mostly shared with other short-term models. First, earthquake probabilities must be calculated after each “perpetrator” earthquake but before the triggered earthquakes, or “victims”. The time interval between a perpetrator and its victims may be very short, as characterized by the Omori law for aftershocks. CSEP evaluates short term models daily, and allows daily updates of the models. However, lots can happen in a day. An alternative is to test and update models on the occurrence of each earthquake over a certain magnitude. To make such updates rapidly enough and to qualify as prospective, earthquake focal mechanisms, slip distributions, stress patterns, and earthquake probabilities would have to be made by computer without human intervention. This scheme would be more appropriate for evaluating scientific ideas, but it may be less useful for practical applications than daily updates. Second, triggered earthquakes are imperfectly recorded following larger events because their seismic waves are buried in the coda of the earlier event. To solve this problem, testing methods need to allow for “censoring” of early aftershock data, and a quantitative model for detection threshold as a function of

  11. Effects of Repeated Testing on Short- and Long-Term Memory Performance across Different Test Formats

    Science.gov (United States)

    Stenlund, Tova; Sundström, Anna; Jonsson, Bert

    2016-01-01

    This study examined whether practice testing with short-answer (SA) items benefits learning over time compared to practice testing with multiple-choice (MC) items, and rereading the material. More specifically, the aim was to test the hypotheses of "retrieval effort" and "transfer appropriate processing" by comparing retention…

  12. Endurance test for IR rig for RI production assembly (test procedure)

    International Nuclear Information System (INIS)

    Chung, Heung June; Ryu, Jeong Soo

    2000-08-01

    This test procedure details the test loop, test method, and test procedure for pressure drop, vibration and endurance test of IR Rig for RI production. From the pressure drop test, the hydraulic design requirements of the capsule are verified. HANARO limit condition is checked and the compatibility with HANARO core is verified. From flow induced vibration test vibration frequency and displacement are investigated. The wear of IR Rig is investigated through endurance test, and these data are used to evaluate the expected wear at maximum resident time of the IR Rig for RI production

  13. Short Circuit Tests First Step of LHC Hardware Commissioning Completion

    CERN Document Server

    Barbero-Soto, E; Bordry, Frederick; Casas Lino, M P; Coelingh, G J; Cumer, G; Dahlerup-Petersen, K; Guillaume, J C; Inigo-Golfin, J; Montabonnet, V; Nisbet, D; Pojer, M; Principe, R; Rodríguez-Mateos, F; Saban, R; Schmidt, R; Thiesen, H; Vergara-Fernández, A; Zerlauth, M; Castaneda Serra, A; Romera Ramirez, I

    2008-01-01

    For the two counter rotating beams in the Large Hadron Collider (LHC) about 8000 magnets (main dipole and quadrupole magnets, corrector magnets, separation dipoles, matching section quadrupoles etc.) are powered in about 1500 superconducting electrical circuits. The magnets are powered by power converters that have been designed for the LHC with a current between 60 and 13000A. Between October 2005 and September 2007 the so-called Short Circuit Tests were carried-out in 15 underground zones where the power converters of the superconducting circuits are placed. The tests aimed to qualify the normal conducting equipments of the circuits such as power converters and normal conducting high current cables. The correct operation of interlock and energy extraction systems was validated. The infrastructure systems including AC distribution, water and air cooling and the control systems was also commissioned. In this paper the results of the two year test campaign are summarized with particular attention to problems e...

  14. Experience of 49 longitudinal intestinal lengthening procedures for short bowel syndrome.

    Science.gov (United States)

    Hosie, S; Loff, S; Wirth, H; Rapp, H-J; von Buch, C; Waag, K-L

    2006-06-01

    Forty-nine patients with a mean age of 25 months underwent a longitudinal intestinal lengthening procedure for short bowel syndrome (SBS) in our institution. Indications for the operation were dependence on parenteral nutrition in spite of adequate conservative management. The small bowel was lengthened from a mean of 27 cm to a mean of 51 cm. There was no intraoperative mortality. The following early complications occurred in our early series: ischemia of a short bowel segment of 2 cm, requiring resection in two patients, insufficiency of the longitudinal anastomosis in two patients and an intra-abdominal abscess in one. Four of 9 non-survivors died of liver failure and 3 of sepsis. Follow-up showed that 19 patients were weaned from parenteral nutrition after a mean of 9.1 months. Long-term complications encountered were dismotility with malabsorption due to bacterial overgrowth caused by progressive dilatation of the bowel, d-lactic acidosis, cholelithiasis and urolithiasis. A longitudinal intestinal lengthening procedure is an effective and safe surgical approach for SBS, provided it is performed in time, the patient's preoperative condition is optimized and technical surgical details are taken into account.

  15. A pilot study of short-duration sputum pretreatment procedures for optimizing smear microscopy for tuberculosis.

    Directory of Open Access Journals (Sweden)

    Peter Daley

    2009-05-01

    Full Text Available Direct sputum smear microscopy for tuberculosis (TB lacks sensitivity for the detection of acid fast bacilli. Sputum pretreatment procedures may enhance sensitivity. We did a pilot study to compare the diagnostic accuracy and incremental yield of two short-duration (<1 hour sputum pretreatment procedures to optimize direct smears among patients with suspected TB at a referral hospital in India.Blinded laboratory comparison of bleach and universal sediment processing (USP pretreated centrifuged auramine smears to direct Ziehl-Neelsen (ZN and direct auramine smears and to solid (Loweinstein-Jensen (LJ and liquid (BACTEC 460 culture. 178 pulmonary and extrapulmonary TB suspects were prospectively recruited during a one year period. Thirty six (20.2% were positive by either solid or liquid culture. Direct ZN smear detected 22 of 36 cases and direct auramine smears detected 26 of 36 cases. Bleach and USP centrifugation detected 24 cases each, providing no incremental yield beyond direct smears. When compared to combined culture, pretreated smears were not more sensitive than direct smears (66.6% vs 61.1 (ZN or 72.2 (auramine, and were not more specific (92.3% vs 93.0 (ZN or 97.2 (auramine.Short duration sputum pretreatment with bleach and USP centrifugation did not increase yield as compared to direct sputum smears. Further work is needed to confirm this in a larger study and also determine if longer duration pre-treatment might be effective in optimizing smear microscopy for TB.

  16. Test Procedure for Axially Loaded Piles in Sand

    DEFF Research Database (Denmark)

    Thomassen, Kristina

    The test procedure described in the following is used when examining the effects of static or cyclic loading on the skin friction of an axially loaded pile in dense sand. The pile specimen is only loaded in tension to avoid any contribution from the base resistance. The pile dimensions are chosen...... to resemble full scale dimension of piles used in offshore pile foundations today. In this report is given a detailed description of the soil preparation and pile installation procedures as well data acquisition methods....

  17. Experimental tests of induced spatial incoherence using short laser wavelength

    International Nuclear Information System (INIS)

    Obenschain, S.P.; Grun, J.; Herbst, M.J.

    1986-01-01

    The authors have developed a laser beam smoothing technique called induced spatial incoherence (ISI), which can produce the highly uniform focal profiles required for direct-drive laser fusion. Uniform well-controlled focal profiles are required to obtain the highly symmetric pellet implosions needed for high-energy gain. In recent experiments, the authors' tested the effects of ISI on high-power laser-target interaction. With short laser wavelength, the coupling physics dramatically improved over that obtained with an ordinary laser beam

  18. Effects of various uranium leaching procedures on soil: Short-term vegetation growth and physiology. Progress report, April 1994

    International Nuclear Information System (INIS)

    Edwards, N.T.

    1994-08-01

    Significant volumes of soil containing elevated levels of uranium exist in the eastern United States. The contamination resulted from the development of the nuclear industry in the United States requiring a large variety of uranium products. The contaminated soil poses a collection and disposal problem of a magnitude that justifies the development of decontamination methods. Consequently, the Department of Energy (DOE) Office of Technology Development formed the Uranium Soils Integrated Demonstration (USID) program to address the problem. The fundamental goal of the USID task group has been the selective extraction/leaching or removal of uranium from soil faster, cheaper, and safer than what can be done using current conventional technologies. The objective is to selectively remove uranium from soil without seriously degrading the soil's physicochemical characteristics and without generating waste that is difficult to manage and/or dispose of. However, procedures developed for removing uranium from contaminated soil have involved harsh chemical treatments that affect the physicochemical properties of the soil. The questions are (1) are the changes in soil properties severe enough to destroy the soil's capacity to support and sustain vegetation growth and survival? and (2) what amendments might be made to the leached soil to return it to a reasonable vegetation production capacity? This study examines the vegetation-support capacity of soil that had been chemically leached to remove uranium. The approach is to conduct short-term germination and phytotoxicity tests for evaluating soils after they are subjected to various leaching procedures followed by longer term pot studies on successfully leached soils that show the greatest capacity to support plant growth. This report details the results from germination and short-term phytotoxicity testing of soils that underwent a variety of leaching procedures at the bench scale at ORNL and at the pilot plant at Fernald

  19. 100 Area soil washing bench-scale test procedures

    International Nuclear Information System (INIS)

    Freeman, H.D.; Gerber, M.A.; Mattigod, S.V.; Serne, R.J.

    1993-03-01

    This document describes methodologies and procedures for conducting soil washing treatability tests in accordance with the 100 Area Soil Washing Treatability Test Plan (DOE-RL 1992, Draft A). The objective of this treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. These data will be primarily used for determining feasibility of the individual unit operations and defining the requirements for a system, or systems, for pilot-scale testing

  20. Development test procedure High Pressure Water Jet System

    International Nuclear Information System (INIS)

    Crystal, J.B.

    1995-01-01

    Development testing will be performed on the water jet cleaning fixture to determine the most effective arrangement of water jet nozzles to remove contamination from the surfaces of canisters and other debris. The following debris may be stained with dye to simulate surface contaminates: Mark O, Mark I, and Mark II Fuel Storage Canisters (both stainless steel and aluminum), pipe of various size, (steel, stainless, carbon steel and aluminum). Carbon steel and stainless steel plate, channel, angle, I-beam and other surfaces, specifically based on the Scientific Ecology Group (SEG) inventory and observations of debris within the basin. Test procedure for developmental testing of High Pressure Water Jet System

  1. Procedure for the delivering of personal short-term visitor dosimeters

    CERN Document Server

    2016-01-01

    Update of the administrative procedure for delivering a personal short-term visitor dosimeter to associated members of CERN’s personnel.   Associated members of the CERN personnel may request a short term visitor dosimeter if working only in Supervised Radiation Areas and for a period of less than two months in a calendar year. Such a dosimeter is delivered without the need to provide the usual regular documents: radiation passport, certificate from the home institute or medical certificate. Periodic verification will ensure that holders of these personal dosimeters do not exceed the maximum allowed personal dose for this type of dosimeter, which is the same as the limit for members of the public at 1 mSv per year. From now on, the two-month period can be spread over a calendar year, offering greater flexibility to users coming to CERN for multiple short periods. Please return unused dosimeters Persons leaving CERN for a period of more than one month should return their dosimeter to the D...

  2. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  3. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  4. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  5. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  6. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  7. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  8. Vietnamese validation of the short version of Internet Addiction Test

    Directory of Open Access Journals (Sweden)

    Bach Xuan Tran

    2017-12-01

    Full Text Available Background and aims: The main goal of the present study was to examine the psychometric properties of a Vietnamese version of the short-version of Internet Addiction Test (s-IAT and to assess the relationship between s-IAT scores and demographics, health related qualify of life and perceived stress scores in young Vietnamese. Methods: The Vietnamese version of s-IAT was administered to a sample of 589 participants. Exploratory factor and reliability analyses were performed. Regression analysis was used to identify the associated factors. Results: The two-factor model of Vietnamese version of s-IAT demonstrated good psychometric properties. The internal consistency of Factor 1 (loss of control/time management was high (Cronbach's alpha=0.82 and Factor 2 (craving/social problems was satisfactory (Cronbach's alpha=0.75. Findings indicated that 20.9% youths were addicted to the Internet. Regression analysis revealed significant associations between Internet addiction and having problems in self-care, lower quality of life and high perceived stress scores. Discussion and conclusions: The Vietnamese version of s-IAT is a valid and reliable instrument to assess IA in Vietnamese population. Due to the high prevalence of IA among Vietnamese youths, IA should be paid attention in future intervention programs. s-IAT can be a useful screening tool for IA to promptly inform and treat the IA among Vietnamese youths. Keywords: Factor analysis, Short-version, Internet Addiction Test, Psychometric properties, Vietnamese

  9. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    International Nuclear Information System (INIS)

    JOHNSTON, D.C.

    2000-01-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A

  10. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  11. Project W-049H collection system Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Carrigan, M.C.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the collection system equipment installed as Pump Station No. 1 (225-W) and Pump Station No. 2 (225-E) have been installed in accordance with the design documents and function as required by the project criteria. This will be a wet test with potable water being introduced into the pump pits to test for leakage. Potable water will also be employed in the testing of the pumps and related mechanical equipment. All Instrument and Control equipment related to the pump stations will be checked electronically with simulated inputs/outputs when actual input/output signals are unavailable. Water from Pump Station 1 will be moved through the TEDF piping system and discharged into the disposal ponds. This will check the proper function of the air/vac valves not tested during construction, and the automated samplers

  12. Acceptance Test Procedure: SY101 air pallet system

    International Nuclear Information System (INIS)

    Koons, B.M.

    1995-01-01

    The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose

  13. Operatibility test procedure for the Waste Information and Control System

    International Nuclear Information System (INIS)

    Flynn, D.F.

    1994-01-01

    This document describes the operability test procedure for the WICS. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE)

  14. A combination of HARMONIE short time direct normal irradiance forecasts and machine learning: The #hashtdim procedure

    Science.gov (United States)

    Gastón, Martín; Fernández-Peruchena, Carlos; Körnich, Heiner; Landelius, Tomas

    2017-06-01

    The present work describes the first approach of a new procedure to forecast Direct Normal Irradiance (DNI): the #hashtdim that treats to combine ground information and Numerical Weather Predictions. The system is centered in generate predictions for the very short time. It combines the outputs from the Numerical Weather Prediction Model HARMONIE with an adaptive methodology based on Machine Learning. The DNI predictions are generated with 15-minute and hourly temporal resolutions and presents 3-hourly updates. Each update offers forecasts to the next 12 hours, the first nine hours are generated with 15-minute temporal resolution meanwhile the last three hours present hourly temporal resolution. The system is proved over a Spanish emplacement with BSRN operative station in south of Spain (PSA station). The #hashtdim has been implemented in the framework of the Direct Normal Irradiance Nowcasting methods for optimized operation of concentrating solar technologies (DNICast) project, under the European Union's Seventh Programme for research, technological development and demonstration framework.

  15. Study on service test procedure for SMES systems

    Energy Technology Data Exchange (ETDEWEB)

    Ren, L., E-mail: rl8868@126.co [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Tang, Y.; Li, J.; Shi, J. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Hu, Y. [State Grid Electric Power Research Institute, Wuhan 430074 (China); Guo, F.; Chen, L.; Cheng, S. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2009-10-15

    Some superconducting magnetic energy storage (SMES) systems have been developed successfully, and the function of them was verified by experiment. Considering the impact on the system security and stability when they are connected to the power system, it is important to build a standard test procedure and propose the main experimental contents for some representative superconducting devices. Based on the experimental results of a 35 kJ/7 kW conduction-cooled high-T{sub c} SMES system, which was developed by Huazhong University of Science and Technology, the test items and methods for a conduction-cooled high-T{sub c} SMES system are studied. For performance evaluation of this high-T{sub c} SMES, three superconducting magnet performance tests, power conditioning characteristic test and dynamic experiment in a simulated power system were fulfilled.

  16. Study on service test procedure for SMES systems

    International Nuclear Information System (INIS)

    Ren, L.; Tang, Y.; Li, J.; Shi, J.; Hu, Y.; Guo, F.; Chen, L.; Cheng, S.

    2009-01-01

    Some superconducting magnetic energy storage (SMES) systems have been developed successfully, and the function of them was verified by experiment. Considering the impact on the system security and stability when they are connected to the power system, it is important to build a standard test procedure and propose the main experimental contents for some representative superconducting devices. Based on the experimental results of a 35 kJ/7 kW conduction-cooled high-T c SMES system, which was developed by Huazhong University of Science and Technology, the test items and methods for a conduction-cooled high-T c SMES system are studied. For performance evaluation of this high-T c SMES, three superconducting magnet performance tests, power conditioning characteristic test and dynamic experiment in a simulated power system were fulfilled.

  17. Project W-314 performance mock-up test procedure

    International Nuclear Information System (INIS)

    CARRATT, R.T.

    1999-01-01

    The purpose of this Procedure is to assist construction in the pre-operational fabrication and testing of the pit leak detection system and the low point drain assembly by: (1) Control system testing of the pit leak detection system will be accomplished by actuating control switches and verifying that the control signal is initiated, liquid testing and overall operational requirements stated in HNF-SD-W314-PDS-003, ''Project Development Specification for Pit Leak Detection''. (2) Testing of the low point floor drain assembly by opening and closing the drain to and from the ''retracted'' and ''sealed'' positions. Successful operation of this drain will be to verify that the seal does not leak on the ''sealed'' position, the assembly holds liquid until the leak detector actuates and the assembly will operate from on top of the mock-up cover block

  18. Quality assurance of radiopharmaceuticals - specifications and test procedures

    International Nuclear Information System (INIS)

    Baldas, J.; Bonnyman, J.; Colmanet, S.F.; Ivanov, Z.; Lauder, R.A.

    1990-10-01

    The authors report on a Radiopharmaceutical Quality Assurance Test Programme carried out by the Australian Radiation Laboratory in which radiopharmaceuticals used in nuclear medicine in Australia are tested for compliance with specifications. Where the radiopharmaceutical is the subject of a monograph in the British Pharmacopoeia or the European Pharmacopoeia, then the specifications given in the Pharmacopoeia are adopted. In other cases the specifications given have been adopted by this Laboratory and have no legal status. In some cases test procedures described have been taken from various Pharmacopoeias or methods published in the literature. In other cases test methods described have been developed at this Laboratory. It should be noted that, unless stated otherwise, specifications listed apply at all times up until product expire

  19. Testing of tubular goods - a critical review of past and actual testing procedures

    Energy Technology Data Exchange (ETDEWEB)

    Teodoriu, C. [Texas A and M Univ., Houston, TX (United States); Holzmann, J.; Klaws, M. [TU Clausthal (Germany). Inst. fuer Erdoel- und Erdgastechnik

    2007-09-13

    Testing of oil country tubular goods (OCTG) is based on standards and offers the user a comparison platform between products of different manufacturers. But, do the standard based testing procedures assume the real loads on OCTG? More likely, the existing standards or recommendations on tubular testing have been evolving together with the new demands on OCTG loading. Since nowadays the oil and gas industry is looking to develop extreme reservoir types (deep water, HP/HT), there is a need of a better understanding and continuous improvement of testing procedures. The following poster proposes an analysis of existing procedures to test tubular goods and then will focus on the future demands on OCTG testing. New loads, as casing fatigue, will be discussed and analyzed based on the authors experience gained during more than 8 years of testing tubular goods at the Clausthal University of Technology, Institute of Petroleum Engineering. (orig.)

  20. Short-term static corrosion tests in lead-bismuth

    Science.gov (United States)

    Soler Crespo, L.; Martín Muñoz, F. J.; Gómez Briceño, D.

    2001-07-01

    Martensitic steels have been proposed to be used as structural materials and as spallation target window in hybrid systems devoted to the transmutation of radioactive waste of long life and high activity. However, their compatibility with lead-bismuth in the operating conditions of these systems depends on the existence of a protective layer such as an oxide film. The feasibility of forming and maintaining an oxide layer or maintaining a pre-oxidised one has been studied. Martensitic steel F82Hmod. (8% Cr) has been tested in lead-bismuth under static and isothermal conditions at 400°C and 600°C. In order to study the first stages of the interaction between the steel and the eutectic, short-term tests (100 and 665 h) have been carried out. Pre-oxidised and as-received samples have been tested in atmospheres with different oxidant potential. For low oxygen concentration in lead-bismuth due to unexpected oxygen consumption in the experimental device, dissolution of as-received F82Hmod. occurs and pre-oxidation does not prevent the material dissolution. For high oxygen concentration, the pre-oxidation layer seems to improve the feasibility of protecting stainless steels controlling the oxygen potential of lead-bismuth with a gas phase.

  1. Short-term static corrosion tests in lead-bismuth

    International Nuclear Information System (INIS)

    Soler Crespo, L.; Martin Munoz, F.J.; Gomez Briceno, D.

    2001-01-01

    Martensitic steels have been proposed to be used as structural materials and as spallation target window in hybrid systems devoted to the transmutation of radioactive waste of long life and high activity. However, their compatibility with lead-bismuth in the operating conditions of these systems depends on the existence of a protective layer such as an oxide film. The feasibility of forming and maintaining an oxide layer or maintaining a pre-oxidised one has been studied. Martensitic steel F82Hmod. (8% Cr) has been tested in lead-bismuth under static and isothermal conditions at 400 o C and 600 o C. In order to study the first stages of the interaction between the steel and the eutectic, short-term tests (100 and 665 h) have been carried out. Pre-oxidised and as-received samples have been tested in atmospheres with different oxidant potential. For low oxygen concentration in lead-bismuth due to unexpected oxygen consumption in the experimental device, dissolution of as-received F82Hmod. occurs and pre-oxidation does not prevent the material dissolution. For high oxygen concentration, the pre-oxidation layer seems to improve the feasibility of protecting stainless steels controlling the oxygen potential of lead-bismuth with a gas phase

  2. Phased Startup Initiative Phase 3 and 4 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, and loaded into the Primary Clean Machine (PCM) for fuel cleaning; and that fuel can be sorted on the Process Table, then loaded back into fuel canisters and relocated in basin storage. An option is included to load selected elements into multi-canister overpack (MCO) Fuel Baskets. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a baseline to predict the effectiveness of equipment design for control of contamination and visibility during production operation. The scope of this test procedure is to validate the operation of FRS and IWTS components as a complete system. Fuel canisters shall be processed in accordance with this test procedure such that fuel inspection results are clearly attributed to a particular set of PCM operating parameters. The Phase 3 test sequence processes a minimum of six canisters. Twenty-four contingency canisters have been identified, and will be processed if additional performance data are required. The Phase 4 test sequence processes a minimum of 29 specific canisters. Twenty-nine contingency canisters have been identified for Phase 4 activities and will be processed to complete process validation, if

  3. Applied field test procedures on petroleum release sites

    International Nuclear Information System (INIS)

    Gilbert, G.; Nichols, L.

    1995-01-01

    The effective remediation of petroleum contaminated soils and ground water is a significant issue for Williams Pipe Line Co. (Williams): costing $6.8 million in 1994. It is in the best interest, then, for Williams to adopt approaches and apply technologies that will be both cost-effective and comply with regulations. Williams has found the use of soil vapor extraction (SVE) and air sparging (AS) field test procedures at the onset of a petroleum release investigation/remediation accomplish these goals. This paper focuses on the application of AS/SVE as the preferred technology to a specific type of remediation: refined petroleum products. In situ field tests are used prior to designing a full-scale remedial system to first validate or disprove initial assumptions on applicability of the technology. During the field test, remedial system design parameters are also collected to tailor the design and operation of a full-scale system to site specific conditions: minimizing cost and optimizing effectiveness. In situ field tests should be designed and operated to simulate as close as possible the operation of a full-scale remedial system. The procedures of an in situ field test will be presented. The results of numerous field tests and the associated costs will also be evaluated and compared to full-scale remedial systems and total project costs to demonstrate overall effectiveness. There are many advantages of As/SVE technologies over conventional fluid extraction or SVE systems alone. However, the primary advantage is the ability to simultaneously reduce volatile and biodegradable compound concentrations in the phreatic, capillary fringe, and unsaturated zones

  4. Dispersant field testing : a review of procedures and considerations

    International Nuclear Information System (INIS)

    Fingas, M.F.

    2004-01-01

    The effectiveness of a dispersant is defined by the amount of oil that the dispersant puts into the water column compared to the amount of oil that was initially spilled. Effectiveness is generally determined visually in plumes of dispersed oil that are visible from ships and aircraft. This paper describes 25 specific issues and technical concerns regarding field testing of dispersant effectiveness. Recent field tests were reviewed and literature that relates to testing procedures was sited. The 25 factors that are important for the appropriate outcome of dispersant field experiments include: mass balance; proper controls; analytical method; differential plume movement; time lag and length of time followed; mathematics of calculation and integration; lower and upper limits of analytical methods; use of remote sensing; thickness measurement; behaviour of oil with surfactant content; surfactant stripping; tracking surface oil and dispersed oil; recovering surface oil; visibility of oil from the surface; background levels of hydrocarbons; fluorescence of dispersant; herding; emulsion breaking; application success; heterogeneity of slick and plume; deposition measurements; true analytical standards; effect of wind on dispersant and slick; dispersant run-off; and weathering of the oil. It was concluded that the most important factors are the ability to determine mass balance, use proper controls, analytical methods and to avoid procedures that give incorrect results. 34 refs., 4 tabs., 1 fig

  5. Operational test procedure for Bldg 241-A-701 air compressor

    International Nuclear Information System (INIS)

    Desantis, G.N.

    1995-01-01

    This document is an Operability Test Procedure (OTP) which will verify and record that the 241-A-701 air compressor and associated equipment operates within their intended design parameters. The activities defined in this OTP will be performed to ensure the daily operation of the new compressed air system can be reliable and efficient. The Compressed Air System (CAS) for 241-A-701 supplies process and instrument air to the A, AX, AY, and AZ tank farms. The primary use of the CAS is for tank farms instrumentation, air operated valves, and air lift circulators

  6. Testing alarm resolution procedures in a fuel fabrication facility

    International Nuclear Information System (INIS)

    Smith, B.W.; Razvi, J.

    1984-07-01

    Process monitoring data can be used for generating material loss estimates. The intent of using process control data is to enhance nuclear material control and accounting for the timely detection and resolution of discrepancies. The purpose of an alarm resolution system is to distinguish between system errors and an actual loss of nuclear material. A study has been performed to develop and test a site-specific set of alarm resolution procedures. The results of the study are described and include the frequency of alarms, the causes of alarms, the type of resolution, and the modeling of loss estimates. 3 references, 2 figures, 2 tables

  7. Technical operations procedure for assembly and emplacement of the soil temperature test--test assembly

    International Nuclear Information System (INIS)

    Weber, A.P.

    1978-01-01

    A description is given of the plan for assembly, instrumentation, emplacement, and operational checkout of the soil temperature test assembly and dry well liner. The activities described cover all operations necessary to accomplish the receiving inspection, instrumentation and pre-construction handling of the dry well liner, plus all operations performed with the test article. Actual details of construction work are not covered by this procedure. Each part and/or section of this procedure is a separate function to be accomplished as required by the nature of the operation. The organization of the procedure is not intended to imply a special operational sequence or schedular requirement. Specific procedure operational sections include: receiving inspection; liner assembly operations; construction operations (by others); prepare shield plug; test article assembly and installation; and operational checkout

  8. Validation of a Short Form of an Indecision Test: The Vocational Assessment Test

    Science.gov (United States)

    Picard, France; Frenette, Éric; Guay, Frédéric; Labrosse, Julie

    2015-01-01

    The purpose of this research was to validate the scores of a short form of a new instrument, "l'Épreuve de décision vocationnelle, forme scolaire" (EDV-9S; vocational assessment test), which measures six indecision-related problems (lack of self-knowledge, lack of readiness, lack of method in decision making, lack of information,…

  9. Operability test procedure for PFP wastewater sampling facility

    International Nuclear Information System (INIS)

    Hirzel, D.R.

    1995-01-01

    Document provides instructions for performing the Operability Test of the 225-WC Wastewater Sampling Station which monitors the discharge to the Treated Effluent Disposal Facility from the Plutonium Finishing Plant. This Operability Test Procedure (OTP) has been prepared to verify correct configuration and performance of the PFP Wastewater sampling system installed in Building 225-WC located outside the perimeter fence southeast of the Plutonium Finishing Plant (PFP). The objective of this test is to ensure the equipment in the sampling facility operates in a safe and reliable manner. The sampler consists of two Manning Model S-5000 units which are rate controlled by the Milltronics Ultrasonic flowmeter at manhole No.C4 and from a pH measuring system with the sensor in the stream adjacent to the sample point. The intent of the dual sampling system is to utilize one unit to sample continuously at a rate proportional to the wastewater flow rate so that the aggregate tests are related to the overall flow and thereby eliminate isolated analyses. The second unit will only operate during a high or low pH excursion of the stream (hence the need for a pH control). The major items in this OTP include testing of the Manning Sampler System and associated equipment including the pH measuring and control system, the conductivity monitor, and the flow meter

  10. Safety panel and new procedures evaluation by simulator tests

    International Nuclear Information System (INIS)

    Meslin, T.

    1986-01-01

    With more than thirty weeks of simulator testing (for the last three years only) and approximately three hundred scenarios, EDF's experience in this field is extensive. This practice is well known within Fossil and Nuclear Generation and is well accepted by the operating teams which participate in it. Simulator testing appears to be an essential decision-making tool in the process of developing new operating aids in PWR plants. Accelerated development and the elimination of long and expensive modifications after commissioning is an economic advantage. The saving in time is obvious, since modifications are carried out continuously throughout the development phase. Finally, operators participate in the development of systems and receive fixed, well-defined applications. This practice has become systematic, and all new applications concerning the operation of PWR plants are simulator-tested, particularly 1300-MW unit computers and operating procedures, the new generation of 900-MW unit computers, and the new 1500-MW fully computerized control rooms. Finally, this simulator testing allows us to considerably increase our knowledge concerning the behavior of operators in accident situations, and special tests are performed for this purpose

  11. 40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.

    Science.gov (United States)

    2010-07-01

    ... corrective action does not resolve the deficiency, you may request to use the contaminated system as an... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION...

  12. 75 FR 59105 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug Testing...

    Science.gov (United States)

    2010-09-27

    ... 2105-AE03 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug... the Federal workplace drug testing program but also pointed out that ``* * * the Department of.... Executive Order 12866 and Regulatory Flexibility Act This Interim Final Rule is not significant for purposes...

  13. Vietnamese validation of the short version of Internet Addiction Test.

    Science.gov (United States)

    Tran, Bach Xuan; Mai, Hue Thi; Nguyen, Long Hoang; Nguyen, Cuong Tat; Latkin, Carl A; Zhang, Melvyn W B; Ho, Roger C M

    2017-12-01

    The main goal of the present study was to examine the psychometric properties of a Vietnamese version of the short-version of Internet Addiction Test (s-IAT) and to assess the relationship between s-IAT scores and demographics, health related qualify of life and perceived stress scores in young Vietnamese. The Vietnamese version of s-IAT was administered to a sample of 589 participants. Exploratory factor and reliability analyses were performed. Regression analysis was used to identify the associated factors. The two-factor model of Vietnamese version of s-IAT demonstrated good psychometric properties. The internal consistency of Factor 1 (loss of control/time management) was high (Cronbach's alpha = 0.82) and Factor 2 (craving/social problems) was satisfactory (Cronbach's alpha = 0.75). Findings indicated that 20.9% youths were addicted to the Internet. Regression analysis revealed significant associations between Internet addiction and having problems in self-care, lower quality of life and high perceived stress scores. The Vietnamese version of s-IAT is a valid and reliable instrument to assess IA in Vietnamese population. Due to the high prevalence of IA among Vietnamese youths, IA should be paid attention in future intervention programs. s-IAT can be a useful screening tool for IA to promptly inform and treat the IA among Vietnamese youths.

  14. Acceptance test procedure for Project W-049H

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field

  15. Recommended procedures for performance testing of radiobioassay laboratories: Volume 3, In vivo test phantoms

    International Nuclear Information System (INIS)

    MacLellan, J.A.; Traub, R.J.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed for the US Department of Energy and the US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard describes the procedures necessary to establish a bioassay performance-testing laboratory and program. The bioassay performance-testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped develop testing procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria by testing the existing measurement capabilities of various bioassay laboratories. This report recommends guidelines for the preparation, handling, storage, distribution, shipping, and documentation of test phantoms used for calibration of measurement systems for direct bioassay. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented

  16. Development of a radionuclide short-test for the evaluation of engine oils in respect to cam- and cylinder linear wear by using OM 616 Kombi-Test conditions

    International Nuclear Information System (INIS)

    Volz, J.; Lausch, W.

    1980-05-01

    A survey is given on the studies performed since 1973 on the development of radionuclide short-test procedure, based on the test procedure of the OM 616 Kombi-Test, for the evaluation of engine oils in respect to cam- and cylinder liner wear (deuteron activated Co-56). Out of the results of these studies on experimental short test procedure has been elaborated to evaluate cylinder liner wear. With this experimental procedure some round robin testing has been carried out by three laboratories using a well-known reference oil and two test oils. The results of this round robin test led to further improvements in the test procedure. This improved test procedure has become a suitable screening-test for the development of engine oils in respect to cylinder liner wear. It never can replace the OM 616-Kombi-Test as a whole, but it will complete it. The radionuclide short test gets results quicker and at lower costs than the Kombi-Test, discriminates between hot test and cold-warm test results, and gives results even with correlation to the Kombi-Test by comparison to an approved reference oil. For such screening work, the repeatability of the test is also sufficient. (orig./HP) [de

  17. TMACS Test Procedure TP005: Sensor configuration, logging, and data conversion

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the projects acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes

  18. Acceptance test procedure for SY Tank Farm replacement exhauster unit

    Energy Technology Data Exchange (ETDEWEB)

    Becken, G.W.

    1994-12-16

    The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

  19. Operability test procedure for 211BA flow proportional sampler

    International Nuclear Information System (INIS)

    Weissenfels, R.D.

    1994-01-01

    The purpose of this operability test procedure (OTP) is to verify the 211-BA flow proportional sampler system and components function correctly as intended by design. System test will include the sampling system, all associated instrumentation, and Facility Process Monitor and Control System (FPMCS). The combined chemical sewer stream from B Plant flows through sump 211BA-SMP-01 located in 211-BA and is continuously monitored for gamma and beta radiation and pH. 211-BA has been upgraded to include a flow proportional sampler. A specified sample volume will be withdrawn at programmed intervals from the 211BA sump and deposited in a 19 liter plastic carboy. The sampler will be programmed per the vendor installation and operations manual by B Plant instrument maintenance personnel. Samples will be taken during five consecutive sample cycles with the sample volumes and sample frequencies recorded for comparison purposes. Additional tests related to the sampler include the alarm circuitry for loss of power and failure to obtain sample

  20. Methods for testing the logical structure of plant procedure documents

    International Nuclear Information System (INIS)

    Horne, C.P.; Colley, R.; Fahley, J.M.

    1990-01-01

    This paper describes an ongoing EPRI project to investigate computer based methods to improve the development, maintenance, and verification of plant operating procedures. This project began as an evaluation of the applicability of structured software analysis methods to operating procedures. It was found that these methods offer benefits, if procedures are transformed to a structured representation to make them amenable to computer analysis. The next task was to investigate methods to transform procedures into a structured representation. The use of natural language techniques to read and compile the procedure documents appears to be viable for this purpose and supports conformity to guidelines. The final task was to consider possibilities of automated verification methods for procedures. Methods to help verify procedures were defined and information requirements specified. These methods take the structured representation of procedures as input. The software system being constructed in this project is called PASS, standing for Procedures Analysis Software System

  1. Short (

    NARCIS (Netherlands)

    Telleman, Gerdien; den Hartog, Laurens

    2013-01-01

    Aim: This systematic review assessed the implant survival rate of short (<10 mm) dental implants installed in partially edentulous patients. A case report of a short implant in the posterior region have been added. Materials and methods: A search was conducted in the electronic databases of MEDLINE

  2. Percutaneous-endoscopic rendezvous procedure for the management of bile duct injuries after cholecystectomy: short- and long-term outcomes

    NARCIS (Netherlands)

    Schreuder, Anne Marthe; Booij, Klaske A. C.; de Reuver, Philip R.; van Delden, Otto M.; van Lienden, Krijn P.; Besselink, Marc G.; Busch, Olivier R.; Gouma, Dirk J.; Rauws, Erik A. J.; van Gulik, Thomas M.

    2018-01-01

    Bile duct injury (BDI) remains a daunting complication of laparoscopic cholecystectomy. In patients with complex BDI, a percutaneous-endoscopic rendezvous procedure may be required to establish bile duct continuity. The aim of this study was to assess short- and long-term outcomes of the rendezvous

  3. Phased Startup Initiative Phase 3 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, loaded into the Primary Clean Machine (PCM) for fuel cleaning, fuel sorted on the Process Table, then loaded back into fuel canisters and relocated in Basin Storage. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a base line to predict the effectiveness of equipment design for control of contamination and visibility during production operation

  4. Phased Startup Initiative Phase 3 and 4 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, and loaded into the Primary Clean Machine (PCM) for fuel cleaning; and that fuel can be sorted on the Process Table, then loaded back into fuel canisters and relocated in basin storage. An option is included to load selected elements into multi-canister overpack (MCO) Fuel Baskets. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a baseline to predict the effectiveness of equipment design for control of contamination and visibility during production operation

  5. Expose : procedure and results of the joint experiment verification tests

    Science.gov (United States)

    Panitz, C.; Rettberg, P.; Horneck, G.; Rabbow, E.; Baglioni, P.

    The International Space Station will carry the EXPOSE facility accommodated at the universal workplace URM-D located outside the Russian Service Module. The launch will be affected in 2005 and it is planned to stay in space for 1.5 years. The tray like structure will accomodate 2 chemical and 6 biological PI-experiments or experiment systems of the ROSE (Response of Organisms to Space Environment) consortium. EXPOSE will support long-term in situ studies of microbes in artificial meteorites, as well as of microbial communities from special ecological niches, such as endolithic and evaporitic ecosystems. The either vented or sealed experiment pockets will be covered by an optical filter system to control intensity and spectral range of solar UV irradiation. Control of sun exposure will be achieved by the use of individual shutters. To test the compatibility of the different biological systems and their adaptation to the opportunities and constraints of space conditions a profound ground support program has been developed. The procedure and first results of this joint Experiment Verification Tests (EVT) will be presented. The results will be essential for the success of the EXPOSE mission and have been done in parallel with the development and construction of the final hardware design of the facility. The results of the mission will contribute to the understanding of the organic chemistry processes in space, the biological adaptation strategies to extreme conditions, e.g. on early Earth and Mars, and the distribution of life beyond its planet of origin.

  6. Testing and qualification of confidence in statistical procedures

    Energy Technology Data Exchange (ETDEWEB)

    Serghiuta, D.; Tholammakkil, J.; Hammouda, N. [Canadian Nuclear Safety Commission (Canada); O' Hagan, A. [Sheffield Univ. (United Kingdom)

    2014-07-01

    tests, but targeted to the context of the particular application and aimed at identifying the domain of validity of the proposed tolerance limit method and algorithm, might provide the necessary confidence in the proposed statistical procedure. The Ontario Power Generation, Bruce Power and AMEC-NSS have supported this work and contributed to the development and execution of the test cases. Their statistical method and results are not, however, discussed in this paper. (author)

  7. Approaching Repetitive Short Circuit Tests on MW-Scale Power Modules by means of an Automatic Testing Setup

    DEFF Research Database (Denmark)

    Reigosa, Paula Diaz; Wang, Huai; Iannuzzo, Francesco

    2016-01-01

    An automatic testing system to perform repetitive short-circuit tests on megawatt-scale IGBT power modules is pre-sented and described in this paper, pointing out the advantages and features of such testing approach. The developed system is based on a non-destructive short-circuit tester, which has...

  8. The Hydraulic Test Procedure for Non-instrumented Irradiation Test Rig of Annular Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dae Ho; Lee, Kang Hee; Shin, Chang Hwan; Park, Chan Kook

    2008-08-15

    This report presents the procedure of pressure drop test, vibration test and endurance test for the non-instrumented rig using the irradiation test in HANARO of advanced PWR annular fuel which were designed and fabricated by KAERI. From the out-pile thermal hydraulic tests, confirm the flow rate at the 200 kPa pressure drop and measure the RMS displacement at this time. And the endurance test is confirmed the wear and the integrity of the non-instrumented rig at the 110% design flow rate. This out-pile test perform the Flow-Induced Vibration and Pressure Drop Experimental Tester(FIVPET) facility. The instruments in FIVPET facility was calibrated in KAERI and the pump and the thermocouple were certified by manufacturer.

  9. Frequency modulation system test procedure shuttle task 501 approach and landing test configuration

    Science.gov (United States)

    Doland, G. D.

    1976-01-01

    Shuttle Task 501 is an in-line task to test the performance and compatibility of radiofrequency links between the SSO and ground, and relay via a satellite. Under Shuttle Task 501 approach and landing test (ALT) phase only a limited portion of the communication and tracking (C&T) equipment is to be tested. The principal item to be tested is a frequency modulated (FM) data link. To test this RF link, an ALT FM System was designed, constructed, and the console wiring verified. A step-by-step procedure to be used to perform the ALT FM system is presented. The ALT FM system test is to be performed prior to delivery of the equipment to the Electronic Systems Test Laboratory (ESTL).

  10. CANFLEX fuel bundle cross-flow endurance test 2 (test procedure)

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sung Deok; Chung, C. H.; Chang, S. K. [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-04-01

    This report describes test procedure of cross-flow 2 test for CANFLEX fuel. In October 1996. a cross-flow test was successfully performed in the KAERI Hot Test Loop for four hours at a water flow rate of 31kg/s, temperature of 266 deg C and inlet pressure of 11MPa, but it is requested more extended time periods to determine a realistic operational margin for the CANFLEX bundle during abnormal refuelling operations. The test shall be conducted for twenty two hours under the reactor conditions. After an initial period of ten hours, the test shall be stopped at the intervals of four hours for bundle inspection and inspect the test bundle end-plate to end-cap welds for failure or crack propagation using liquid penetrant examination. 2 refs., 1 fig. (Author)

  11. Method matters: systematic effects of testing procedure on visual working memory sensitivity.

    Science.gov (United States)

    Makovski, Tal; Watson, Leah M; Koutstaal, Wilma; Jiang, Yuhong V

    2010-11-01

    Visual working memory (WM) is traditionally considered a robust form of visual representation that survives changes in object motion, observer's position, and other visual transients. This article presents data that are inconsistent with the traditional view. We show that memory sensitivity is dramatically influenced by small variations in the testing procedure, supporting the idea that representations in visual WM are susceptible to interference from testing. In the study, participants were shown an array of colors to remember. After a short retention interval, memory for one of the items was tested with either a same-different task or a 2-alternative-forced-choice (2AFC) task. Memory sensitivity was much lower in the 2AFC task than in the same-different task. This difference was found regardless of encoding similarity or of whether visual WM required a fine or coarse memory resolution. The 2AFC disadvantage was reduced when participants were informed shortly before testing which item would be probed. The 2AFC disadvantage diminished in perceptual tasks and was not found in tasks probing visual long-term memory. These results support memory models that acknowledge the labile nature of visual WM and have implications for the format of visual WM and its assessment. (c) 2010 APA, all rights reserved

  12. Testing declarative memory in laboratory rats and mice using the nonconditioned social discrimination procedure.

    Science.gov (United States)

    Engelmann, Mario; Hädicke, Jana; Noack, Julia

    2011-07-14

    Testing declarative memory in laboratory rodents can provide insights into the fundamental mechanisms underlying this type of learning and memory processing, and these insights are likely to be applicable to humans. Here we provide a detailed description of the social discrimination procedure used to investigate recognition memory in rats and mice, as established during the last 20 years in our laboratory. The test is based on the use of olfactory signals for social communication in rodents; this involves a direct encounter between conspecifics, during which the investigatory behavior of the experimental subject serves as an index for learning and memory performance. The procedure is inexpensive, fast and very reliable, but it requires well-trained human observers. We include recent modifications to the procedure that allow memory extinction to be investigated by retroactive and proactive interference, and that enable the dissociated analysis of the central nervous processing of the volatile fraction of an individual's olfactory signature. Depending on the memory retention interval under study (short-term memory, intermediate-term memory, long-term memory or long-lasting memory), the protocol takes ~10 min or up to several days to complete.

  13. Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing

    Science.gov (United States)

    2018-04-27

    Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing 5a. CONTRACT...NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING...ORGANIZATION NAME(S) AND ADDRESS(ES) US Army Dugway Proving Ground West Desert Test Center (TEDT-DPW) Dugway, UT 84022-5000 8. PERFORMING ORGANIZATION

  14. 78 FR 75961 - Energy Conservation Program: Test Procedures for Electric Motors

    Science.gov (United States)

    2013-12-13

    ... Conservation Program: Test Procedures for Electric Motors; Final Rule #0;#0;Federal Register / Vol. 78 , No... Procedures for Electric Motors AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy... procedures for electric motors to allow currently unregulated motors to be tested by clarifying the test...

  15. 77 FR 74559 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters...

    Science.gov (United States)

    2012-12-17

    ... Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters, Direct Heating... Energy (DOE) is amending its test procedures for residential water heaters, direct heating equipment (DHE... necessary for residential water heaters, because the existing test procedures for those products already...

  16. 76 FR 56347 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters...

    Science.gov (United States)

    2011-09-13

    ... Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters, Direct Heating... proposed to amend, where appropriate, its test procedures for residential water heaters, direct heating... notes that the test procedure and metric for residential water heaters currently address and incorporate...

  17. 78 FR 41609 - Energy Conservation Program for Consumer Products: Test Procedures for Refrigerators...

    Science.gov (United States)

    2013-07-10

    ... September 14, 1977. 42 FR 46140. Industry representatives viewed these test procedures as too complex and... Freezers'' (HRF-1- 1979). Using this industry-created test procedure, DOE revised its test procedures on... compartment of such a product to be at a level that would effectively exclude the coverage of combination wine...

  18. Test plan/procedure for the SPM-1 shipping container system. Revision 0

    International Nuclear Information System (INIS)

    Flanagan, B.D.

    1995-01-01

    The 49 CFR 173.465 Type A packaging tests will verify that SPM-1 will provide adequate protection and pass as a Type A package. Test will determine that the handle of the Pig will not penetrate through the plywood spacer and rupture the shipping container. Test plan/procedure provides planning, pre-test, setup, testing, and post-testing guidelines and procedures for conducting the open-quotes Free Drop Testclose quotes procedure for the SPM-1 package

  19. Engineering scale tests of mechanical disassembly and short stroke shearing systems for FBR fuel assembly

    International Nuclear Information System (INIS)

    Higuchi, Hidetoshi; Kitagaki, Toru; Koizumi, Kenji; Hirano, Hiroyasu; Takeuchi, Masayuki; Washiya, Tadahiro; Kawabe, Yukinari; Kobayashi, Tsuguyuki

    2011-01-01

    Japan Atomic Energy Agency (JAEA) and The Japan Atomic Power Company (JAPC) have been developing an advanced head-end process based on mechanical disassembly and short stroke shearing systems as a part of Fast Reactor Cycle Technology Development (FaCT). Fuel pins for a fast reactor are installed within a hexagonal shaped wrapper tube made of stainless steel. In order to reprocess the fast reactor fuel pins, they must be removed from the wrapper tube and transported to the shearing system without failure. In addition, the advanced aqueous reprocessing process, called 'NEXT' (New Extraction System for TRU Recovery) process requires a solution of the spent fuel with relatively high concentration (500g/L). JAEA and JAPC have developed the mechanical disassembly and the short stroke shearing technology which is expected to make fragmented fuel to satisfy these requirements. This paper reports the results of engineering scale tests on the mechanical disassembly and short stroke shearing systems. These tests were carried out with simulated FBR fuel assembly and removed pins. The mechanical cutting method has been developed to avoid fuel pin failure during disassembly operation. The cutting process is divided into two modes, so called 'slit-cut' for cutting the wrapper tube and 'crop-cut' for the end plug region of the fuel pin bundle. In the slit-cut mode, the depth of cutting was automatically controlled based on the calculated wastage of the cutting tool and deformation of the wrapper tube which had been measured before the cutting. This procedure was confirmed to minimize the fuel pin failure which was hard to prevent in the case of laser cutting. The cutting speed was also controlled automatically by the electric current of the cutting motor to lower the load of the cutting tool. The removed fuel pins were transported to the shearing machine, whose fuel shearing magazine width was set to be narrow to realize the suitable configuration for the short stroke shearing

  20. A fast network solution by the decoupled procedure during short-term dynamic processes in power systems

    Energy Technology Data Exchange (ETDEWEB)

    Popovic, D P; Stefanovic, M D [Nikola Tesla Inst., Belgrade (YU). Power System Dept.

    1990-01-01

    A simple, fast and reliable decoupled procedure for solving the network problems during short-term dynamic processes in power systems is presented. It is based on the Newton-Raphson method applied to the power balance equations, which include the effects of generator saliency and non-impedance loads, with further modifications resulting from the physical properties of the phenomena under study. The good convergence characteristics of the developed procedure are demonstrated, and a comparison is made with the traditional method based on the current equation and the triangularized admittance matrix, using the example of stability analysis of the Yugoslav power grid. (author).

  1. Performance simulations of catalytic converters during the Federal Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    Shen, H.; Shamim, T.; Sengupta, S.; Son, S.; Adamczyk, A.A.

    1999-07-01

    A numerical study is carried out to predict the tailpipe emissions and emission conversion efficiencies of unburned hydrocarbon, nitrogen oxide and carbon monoxide flowing through a catalytic converter during the Federal Test Procedure (FTP). The model considers the effect of heat transfer in the catalytic converter, coupled with catalyst chemical kinetics, including an oxygen storage mechanism. The resulting governing equations based on the conservation of mass and energy are solved by a tridiagonal matrix algorithm (TDMA) with a successive line under relaxation method. The numerical scheme for this non-linear problem is found to have good convergence efficiency. The simulation for the complete FTP cycle is accomplished in less than fifteen minutes on a desktop personal computer. A 13-step reaction mechanism plus a nine-step O{sub 2} storage mechanism is used to simulate the chemical kinetics. The energy equations include the heat loss due to conduction and convection plus the energy liberated by chemical reactions. The effect of radiation is assumed to be negligible and is not considered. The results of the numerical model for both the instantaneous and accumulated emissions are found to be in good agreement with experimental measurements. The conversion efficiencies of HC, CO and NO as predicted by the model are found to be within 5% of those dynamic measurements, and calculated results of accumulated HC, CO and NO{sub x} are in fair agreement with experimental measurements. The transient measurements are also used to check the robustness of the numerical model. The model is found to be robust and hence can simulate various operating conditions of engine output to the converter.

  2. TMACS test procedure TP005: Sensor configuration, logging, and data conversion. Revision 4

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the sensor configuration, conversion and logging requirements of the TMACS. The features to be tested are as follows: sensor configuration data; conversion of continuous sensor data to engineering units; conversion of digital data to discrete states; discrete sensor data logging; and continuous sensor data logging

  3. Short-term consistency testing vs. long-term behavior

    International Nuclear Information System (INIS)

    Ebert, W.L.; Bakel, A.J.; Wolf, S.F.; Strachan, D.M.

    1997-01-01

    The authors conducted Product Consistency Tests (PCTs) with a surrogate low-activity waste (LAW) glass to (1) evaluate the possible use of various test conditions in a specification test for LAW waste forms, (2) measure the reproducibility of the test at low temperatures, and (3) determine if the rates calculated from 7-day PCTs bound the rates measured in PCT conducted for longer durations, which represent more advanced corrosion. The effects of temperature and pH on the dissolution rate in PCTs are much less than the effects observed in dilute solutions due to the buildup of dissolved glass components in the PCTs. The precision of replicate 7-day tests at 20 and 40 degrees C was limited by the analytical uncertainty. The dissolution rates at all temperatures decreased with the test duration initially. However, the dissolution rates in tests at 70 and 90 degrees C increased when certain alteration phases formed after about 100 and 500 days, respectively; the rates in some tests exceeded that measured in a 7-day PCT. While the 7-day PCT does not provide a bounding rate for this glass at 70 or 90 degrees C, tests for longer durations are needed to determine if a 7-day test provides a bounding rate at lower temperatures

  4. Weld Design, Testing, and Assessment Procedures for High Strength Pipelines

    Science.gov (United States)

    2011-12-20

    Long-distance high-strength pipelines are increasingly being constructed for the efficient transportation of energy products. While the high-strength linepipe steels and high productivity welding processes are being applied, the procedures employed f...

  5. AIChe equipment testing procedure centrifugal compressors : a guide to performance evaluation and site testing

    CERN Document Server

    AIChE

    2013-01-01

    With its engineer-tested procedures and thorough explanations, Centrifugal Compressors is an essential text for anyone engaged in implementing new technology in equipment design, identifying process problems, and optimizing equipment performance.  This condensed book presents a step by step approach to preparing for, planning, executing, and analyzing tests of centrifugal compressors, with an emphasis on methods that can be conducted on-site and with an acknowledgement of the strengths and limitations of these methods. The book opens with an extensive and detailed section offering definitions

  6. Leach test of six 192-iridium pellets based on the IAEA 'special form' test procedures

    International Nuclear Information System (INIS)

    Gordon, G.; Gerdingh, R.

    1981-07-01

    The designation 'special form' may be applied to indispersible solid radioactive material if the material meets the requirements of the tests described in the International Atomic Energy Agency Regulations for the Safe Transport of Radioactive Type Materials. This report presents the procedures and results of a leach test performed as specified in the regulations on 6 'as received' active 192-iridium pellets. Mechanical tests were not carried out prior to or following the leach test. The activity of each of the first 6 water baths was found to be between 2.3 and 12.6 μCi, (8.5 x 10 4 and 4.7 x 10 5 Bq) and of the second 6, between 1.3 to 6.0 μCi, (4.8 x 10 4 to 2.2 x 10 5 Bq) thus exceeding the allowable limit

  7. EFSUMB Guidelines on Interventional Ultrasound (INVUS), Part III - Abdominal Treatment Procedures (Short Version)

    DEFF Research Database (Denmark)

    Dietrich, Christoph F; Lorentzen, T.; Appelbaum, L.

    2016-01-01

    The third part of the European Federation of Societies for Ultrasound in Medicine and Biology (EFSUMB) Guidelines on Interventional Ultrasound assesses the evidence for ultrasound-guided and assisted interventions in abdominal treatment procedures. Recommendations for clinical practice are presen...

  8. Tests for nonlinearity in short stationary time series

    International Nuclear Information System (INIS)

    Chang, T.; Sauer, T.; Schiff, S.J.

    1995-01-01

    To compare direct tests for detecting determinism in chaotic time series, data from Henon, Lorenz, and Mackey--Glass equations were contaminated with various levels of additive colored noise. These data were analyzed with a variety of recently developed tests for determinism, and the results compared

  9. Short Report Challenges with targeted viral load testing for medical ...

    African Journals Online (AJOL)

    Challenges with targeted viral load testing 179. Malawi Medical ... targeted viral load (VL) testing for patients who have been on ART for at least .... Tuberculosis. 32. Community-acquired pneumonia. 17. Non-typhoidal Salmonella sepsis. 5. Bacterial meningitis. 5. Disseminated Kaposi sarcoma. 4. Cryptococcal meningitis. 4.

  10. 77 FR 49063 - Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products

    Science.gov (United States)

    2012-08-15

    ... Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products; Proposed...-AC01 Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products... procedures for both dishwashers and conventional cooking products for the measurement of energy use in fan...

  11. Fourteen years of test experience with short-circuit withstand capability of large power transformers

    NARCIS (Netherlands)

    Smeets, R.P.P.; Paske, te L.H.

    2010-01-01

    Experience is reported of short-circuit testing of large power transformers during the past 14 years by KEMA in the Netherlands. In total, 119 transformers > 25 MVA participated in the survey. KEMA shows that at initial access to standard IEC short-circuit tests, 28% failed initially in a wide range

  12. Sixteen years of test experiences with short-circuit withstand capability of large power transformers

    NARCIS (Netherlands)

    Smeets, R.P.P.; Paske, te L.H.

    2012-01-01

    Experience is reported of short-circuit testing of large power transformers during the past 16 years by KEMA in the Netherlands. In total, 174 transformers > 25 MVA participated in the survey. KEMA shows that at initial access to standard IEC short-circuit tests, 24% failed initially in a wide range

  13. Development of processing procedures for advanced silicon solar cells. [antireflection coatings and short circuit currents

    Science.gov (United States)

    Scott-Monck, J. A.; Stella, P. M.; Avery, J. E.

    1975-01-01

    Ten ohm-cm silicon solar cells, 0.2 mm thick, were produced with short circuit current efficiencies up to thirteen percent and using a combination of recent technical advances. The cells were fabricated in conventional and wraparound contact configurations. Improvement in cell collection efficiency from both the short and long wavelengths region of the solar spectrum was obtained by coupling a shallow junction and an optically transparent antireflection coating with back surface field technology. Both boron diffusion and aluminum alloying techniques were evaluated for forming back surface field cells. The latter method is less complicated and is compatible with wraparound cell processing.

  14. Relationship Between Short Sleep Duration and Preseason Concussion Testing.

    Science.gov (United States)

    Silverberg, Noah D; Berkner, Paul D; Atkins, Joseph E; Zafonte, Ross; Iverson, Grant L

    2016-05-01

    Baseline, preseason assessment of cognition, symptoms, and balance has been recommended as part of a comprehensive sport concussion management program. We examined the relationship between sleep and baseline test results. We hypothesized that adolescents who slept fewer hours the night before would report more symptoms and perform more poorly on cognitive testing than students who had a full night sleep. Cross-sectional observation study. Preseason concussion testing for high school athletes. A large sample (n = 2928) of student athletes from Maine, USA, between the ages of 13 and 18 years completed preseason testing. Participants with developmental problems, a history of treatment for neurological or psychiatric problems, recent concussion, or 3 or more prior concussions were excluded. Athletes were divided into 4 groups based on their sleep duration the night before testing. Immediate Post-Concussion Assessment and Cognitive Testing (ImPACT; ImPACT Applications, Inc, Pittsburgh, PA) cognitive composite scores and the embedded Post-Concussion Symptom Scale. Sleep was not related to any ImPACT cognitive composite score, after covarying for age and controlling for multiple comparisons. In contrast, there were sleep duration, sex, and sleep duration by sex effects on the Post-Concussion Symptom Scale. The effect of sleep duration on symptom reporting was more pronounced in girls. Supplementary analyses suggested that sleep insufficiency was associated with a diverse array of postconcussion-like symptoms. Poor sleep the night before baseline or postinjury testing may be an important confound when assessing postconcussion symptoms. Girls may be more vulnerable to experiencing and reporting symptoms following insufficient sleep. Clinicians should routinely ask how the athlete slept the night before preseason baseline testing and consider deferring the symptom assessment or later retesting athletes who slept poorly.

  15. 77 FR 28519 - Test Procedure Guidance for Room Air Conditioners, Residential Dishwashers, and Residential...

    Science.gov (United States)

    2012-05-15

    ... Guidance for Room Air Conditioners, Residential Dishwashers, and Residential Clothes Washers: Public... procedures for room air conditioners, residential dishwashers, and residential clothes washers. DATES: DOE...'s existing test procedures for residential room air conditioners, residential dishwashers, and...

  16. 40 CFR 60.583 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Flexible Vinyl... following procedures: (1) Determine and record the VOC content and amount of each ink used at the print head...' formulation data along with plant blending records (if plant blending is done) may be used to determine VOC...

  17. Operability test procedure for the TK-900 effluent monitoring station

    International Nuclear Information System (INIS)

    Weissenfels, R.D.

    1994-01-01

    This procedure will verify that the 221-B liquid effluent monitoring system, installed near the east end of the 6-in. chemical sewer header, functions as intended by design. TK-900B was installed near stairwell 3 in the 221-B electrical gallery by Project W-007H. The system is part of BAT/AKART for the BCE liquid effluent system

  18. 40 CFR 610.64 - Track test procedures.

    Science.gov (United States)

    2010-07-01

    ... truck or trailer. (4) Fuel economy will be determined by either a gravimetric or volumetric method. (c... dynamometer except that fuel economy will be measured by gravimetric or volumetric methods. ... either a volumetric or gravimetric procedure approved by the Administrator. (5) Vehicle speed and...

  19. Quality Testing of Short Rotation Coppice Willow Cuttings

    Directory of Open Access Journals (Sweden)

    Katrin Heinsoo

    2018-06-01

    Full Text Available The production and feasibility of Short Rotation Coppice depend on cutting early performance. The shoot and root biomass production of Salix cuttings in hydroponic conditions was studied. The amount of sprouted biomass after four weeks of growth depended on cutting the diameter, but the original position of the cutting along the rod or number of visible buds was not in correlation with biomass produced. Application of mineral fertilizer or soil originating from the willow plantation did not increase the total production. On the contrary, the addition of soil tended to decrease biomass production and we assumed this was a result of a shortage of light. Under the influence of fertilization, plants allocated greater biomass to roots. Comparison of different clones revealed that those with S. dasyclados genes tended to allocate less biomass to roots and the poorest-performing clone in our experiment, also had the lowest wood production in the plantation. The number of visible buds on the cutting was also clone-specific.

  20. Operability test procedure for the Rotary Mode Core Sampling System Exhausters 3 and 4

    International Nuclear Information System (INIS)

    WSaldo, E.J.

    1995-01-01

    This document provides a procedure for performing operability testing of the Rotary Mode Core Sampling System Exhausters 3 ampersand 4. Upon completion of testing activities an operability testing report will be issued

  1. SFC/SFBMN guidelines update for nuclear cardiology procedures: stress testing in adults and children

    International Nuclear Information System (INIS)

    Manrique, A.; Marie, P.Y.; Maunoury, Ch.; Acar, Ph.; Agostini, D.

    2002-01-01

    The guidelines update for nuclear cardiology procedures are studied in this article. We find the minimum technique conditions for the stress testing practice, the recommendations for the different ischemia activation tests, the choice of the stress test. (N.C.)

  2. Short-Cut Estimators of Criterion-Referenced Test Consistency.

    Science.gov (United States)

    Brown, James Dean

    1990-01-01

    Presents simplified methods for deriving estimates of the consistency of criterion-referenced, English-as-a-Second-Language tests, including (1) the threshold loss agreement approach using agreement or kappa coefficients, (2) the squared-error loss agreement approach using the phi(lambda) dependability approach, and (3) the domain score…

  3. The minimal ice water caloric test compared with established vestibular caloric test procedures.

    Science.gov (United States)

    Schmäl, Frank; Lübben, Björn; Weiberg, Kerstin; Stoll, Wolfgang

    2005-01-01

    Caloric testing of the vestibular labyrinth is usually performed by classical caloric test procedures (CCTP) using water warmed to 30 degrees C and 44 degrees C. Ice water irrigation (4 degrees C) is usually not performed, although it might be useful as a bedside test. To verify the validity of the Minimal Ice Water Caloric Test (MIWCT), comparative video-oculographic investigations were performed in 22 healthy subjects using ice water (0.5 ml, 1.0 ml, 2 ml), CCTP, and cold air (27 degrees C). Frequency, amplitude, slow phase velocity (SPV), the onset, and the duration of nystagmus were documented. After addition of three ice cubes, the temperature of conventional tap water (16 degrees C) fell within 13 min to 4 degrees C. In pessimum position the subjects demonstrated no nystagmus response. Compared to CCTP, MIWCT was associated with a significantly later onset of nystagmus and a significant prolongation of the nystagmus reaction. In contrast to air stimulation (27 degrees C), a significant Spearman's correlation was noted between MIWCT (1 and 2 ml) and established CCTP in respect of essential nystagmus parameters (frequency, amplitude and SPV). Furthermore, MIWCT (0.5 and 1 ml) showed a higher sensitivity and specificity with regard to the detection of canal paresis based on Jongkees' formula compared to stimulation with air 27 degrees C. Thus, MIWCT appears to be a suitable procedure for bedside investigation of vestibular function outside the vestibular laboratory, e.g. in a hospital ward, where bedridden patients with vertigo occasionally require vestibular testing.

  4. 46 CFR 164.008-3 - Testing procedure.

    Science.gov (United States)

    2010-10-01

    ... control. (1) The furnace temperature shall be determined by at least four mineral insulated thermocouples... further definition of the time-temperature curve, see Appendix I of the ASTM Standard E119, “Fire Tests of... openings are formed during the test, an ignition test as prescribed in § 164.008-4(b) shall take place...

  5. A minimax procedure in the context of sequential mastery testing

    NARCIS (Netherlands)

    Vos, Hendrik J.

    1999-01-01

    The purpose of this paper is to derive optimal rules for sequential mastery tests. In a sequential mastery test, the decision is to classify a subject as a master or a nonmaster, or to continue sampling and administering another random test item. The framework of minimax sequential decision theory

  6. A NOTE ON THE CONVENTIONAL OUTLIER DETECTION TEST PROCEDURES

    Directory of Open Access Journals (Sweden)

    JIANFENG GUO

    Full Text Available Under the assumption of that the variance-covariance matrix is fully populated, Baarda's w-test is turn out to be completely different from the standardized least-squares residual. Unfortunately, this is not generally recognized. In the limiting case of only one degree of freedom, all the three types of test statistics, including Gaussian normal test, Student's t-test and Pope's Tau-test, will be invalid for identification of outliers: (1 all the squares of the Gaussian normal test statistic coincide with the goodness-of-fit (global test statistic, even for correlated observations. Hence, the failure of the global test implies that all the observations will be flagged as outliers, and thus the Gaussian normal test is inconclusive for localization of outliers; (2 the absolute values of the Tau-test statistic are all exactly equal to one, no matter whether the observations are contaminated. Therefore, the Tau-test cannot work for outlier detection in this situation; and (3 Student's t-test statistics are undefined.

  7. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    HOLM, M.J.

    1999-01-01

    This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver devices. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  8. A facility to test short superconducting accelerator magnets at Fermilab

    International Nuclear Information System (INIS)

    Lamm, M.J.; Hess, C.; Lewis, D.; Jaffery, T.; Kinney, W.; Ozelis, J.P.; Strait, J.; Butteris, J.; McInturff, A.D.; Coulter, K.J.

    1992-10-01

    During the past four years the Superconducting Magnet R ampersand D facility at Fermilab (Lab 2) has successfully tested superconducting dipole, quadrupole, and correction coil magnets less than 2 meters in length for the SSC project and the Tevatron D0/B0 Low-β Insertion. During this time several improvements have been made to the facility that have greatly enhanced its magnet testing capabilities. Among the upgrades have been a new rotating coil and data acquisition system for measuring magnetic fields, a controlled flow liquid helium transfer line using an electronically actuated cryo valve, and stand-alone systems for measuring AC loss and training low current Tevatron correction coil packages. A description of the Lab 2 facilities is presented

  9. Percutaneous-endoscopic rendezvous procedure for the management of bile duct injuries after cholecystectomy: short- and long-term outcomes.

    Science.gov (United States)

    Schreuder, Anne Marthe; Booij, Klaske A C; de Reuver, Philip R; van Delden, Otto M; van Lienden, Krijn P; Besselink, Marc G; Busch, Olivier R; Gouma, Dirk J; Rauws, Erik A J; van Gulik, Thomas M

    2018-01-19

     Bile duct injury (BDI) remains a daunting complication of laparoscopic cholecystectomy. In patients with complex BDI, a percutaneous-endoscopic rendezvous procedure may be required to establish bile duct continuity. The aim of this study was to assess short- and long-term outcomes of the rendezvous procedure.  All consecutive patients with BDI referred to our tertiary referral center between 1995 and 2016 were analyzed. A rendezvous procedure was performed when endoscopic or radiologic intervention failed, and when deemed feasible by a dedicated multidisciplinary team including hepatopancreaticobiliary surgeons, gastrointestinal endoscopists, and interventional radiologists. Classification of BDI, technical success of the rendezvous procedure, procedure-related adverse events, and outcomes were assessed.  Among a total of 812 patients, rendezvous was performed in 47 (6 %), 31 (66 %) of whom were diagnosed with complete transection of the bile duct (Amsterdam type D/Strasberg type E injury). The primary success rate of rendezvous was 94 % (44 /47 patients). Overall morbidity was 18 % (10 /55 procedures). No life-threatening adverse events or 90-day mortality occurred. After a median follow-up of 40 months (interquartile range 23 - 54 months), rendezvous was the final successful treatment in 26 /47 patients (55 %). In 14 /47 patients (30 %), rendezvous acted as a bridge to surgery, with hepaticojejunostomy being chosen either primarily or secondarily to treat refractory or relapsing stenosis. In experienced hands, rendezvous was a safe procedure, with a long-term success rate of 55 %. When endoscopic or transhepatic interventions fail to restore bile duct continuity in patients with BDI, rendezvous should be considered, either as definitive treatment or as a bridge to elective surgery. © Georg Thieme Verlag KG Stuttgart · New York.

  10. A testing procedure for wind turbine generators based on the power grid statistical model

    DEFF Research Database (Denmark)

    Farajzadehbibalan, Saber; Ramezani, Mohammad Hossein; Nielsen, Peter

    2017-01-01

    In this study, a comprehensive test procedure is developed to test wind turbine generators with a hardware-in-loop setup. The procedure employs the statistical model of the power grid considering the restrictions of the test facility and system dynamics. Given the model in the latent space...

  11. 40 CFR 1051.501 - What procedures must I use to test my vehicles or engines?

    Science.gov (United States)

    2010-07-01

    ... vehicles or engines? 1051.501 Section 1051.501 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM RECREATIONAL ENGINES AND VEHICLES Test Procedures § 1051.501 What procedures must I use to test my vehicles or engines? This section describes test...

  12. Test procedures, AN/AIC-27 system and component units. [for space shuttle

    Science.gov (United States)

    Reiff, F. H.

    1975-01-01

    The AN/AIC-27 (v) intercommunication system is a 30-channel audio distribution which consists of: air crew station units, maintenance station units, and a central control unit. A test procedure for each of the above units and also a test procedure for the system are presented. The intent of the test is to provide data for use in shuttle audio subsystem design.

  13. 10 CFR 431.193 - Test procedures for measuring energy consumption of distribution transformers.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for measuring energy consumption of distribution transformers. 431.193 Section 431.193 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY... § 431.193 Test procedures for measuring energy consumption of distribution transformers. The test...

  14. 9 CFR 147.8 - Procedures for preparing egg yolk samples for diagnostic tests.

    Science.gov (United States)

    2010-01-01

    ... samples for diagnostic tests. 147.8 Section 147.8 Animals and Animal Products ANIMAL AND PLANT HEALTH... IMPROVEMENT PLAN Blood Testing Procedures § 147.8 Procedures for preparing egg yolk samples for diagnostic... for diagnostic testing. (b) The authorized laboratory must identify each egg as to the breeding flock...

  15. 77 FR 28805 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2012-05-16

    ... Energy Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and... (SNOPR) to amend the test procedures for microwave ovens. That SNOPR proposed amendments to the DOE test... mode energy use of products that combine a microwave oven with other appliance functionality, as well...

  16. High-Frequency Axial Fatigue Test Procedures for Spectrum Loading

    Science.gov (United States)

    2016-07-20

    cycle runout limit. PURPOSE 2. To develop the capability to perform High-Frequency (H-F) Spectrum Fatigue tests, an in- house Basic and...response of the test specimen to the command input signal for load cycling . These cycle -by- cycle errors accumulate over the life of the test specimen...fatigue life model. It is expected that the cycle -by- cycle P-V error may vary substantially depending on the load spectrum content, the compensation

  17. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    BARNES, D.A.

    2000-06-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  18. NNWSI Phase II materials interaction test procedure and preliminary results

    International Nuclear Information System (INIS)

    Bates, J.K.; Gerding, T.J.

    1985-01-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) project is investigating the volcanic tuff beds of Yucca Mountain, Nevada, as a potential location for a high-level radioactive waste repository. This report describes a test method (Phase II) that has been developed to measure the release of radionuclides from the waste package under simulated repository conditions, and provides information on materials interactions that may occur in the repository. The results of 13 weeks of testing using the method are presented, and an analog test is described that investigates the relationship between the test method and expected repository conditions. 9 references, 10 figures, 11 tables

  19. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    BARNES, D.A.

    2000-01-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  20. A system for personnel qualification of non-destructive testing procedures from testing and and qualification system in Sweden

    International Nuclear Information System (INIS)

    Kuna, M.; Kubis, S.; Plasek, J.

    1999-01-01

    The method for qualification of non-destructive testing personnel carrying out inspections by means of ultrasonic and eddy-current tests to inspect cladding in BWR reactor pressure vessel and core shroud lid. Development of procedures tests with real artificial cracks, blind tests. Evaluation of results by the Swedish Qualification Commission. Performance of the tests at Oskarshamn-1

  1. Evaluation of Surface Infiltration Testing Procedures in Permeable Pavement Systems

    Science.gov (United States)

    The ASTM method (ASTM C1701) for measuring infiltration rate of in-place pervious concrete provides limited guidance on how to select testing locations, so research is needed to evaluate how testing sites should be selected and how results should be interpreted to assess surface ...

  2. 40 CFR 600.111-93 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... cycle. (g) Engine starting and restarting. (1) If the engine is not running at the initiation of the... action. (h) Dynamometer test run. The following steps must be taken for each test: (1) Place the drive... controlling high tire or brake temperatures during dynamometer operation. (3) Preparation of the CVS must be...

  3. 40 CFR 51.357 - Test procedures and standards.

    Science.gov (United States)

    2010-07-01

    ... following steps: (i) Test equipment shall be connected to the fuel tank canister hose at the canister end... minutes and monitor for a sudden pressure drop, indicating that the fuel tank was pressurized. (v) The... be performed without repair or adjustment at the inspection facility, prior to the test, except as...

  4. 16 CFR 1209.5 - Test procedures for corrosiveness.

    Science.gov (United States)

    2010-01-01

    ... to eliminate air pockets from forming next to the metal coupons. (5) Do not cover the crystallizing... bristle brush or equivalent to remove loose corrosion products. Remove the remaining corrosion products... Evaluating Corrosion Test Specimens,” published by American Society for Testing and Materials, 1916 Race...

  5. 16 CFR 1700.20 - Testing procedure for special packaging.

    Science.gov (United States)

    2010-01-01

    ... packages shall be tested at room temperature. (2) Child test—(i) Test subjects—(A) Selection criteria. Use... be done in a location that is familiar to the children, for example, their customary nursery school... temperature. 3. Reclosable packages shall be opened and properly resecured one time (or more if appropriate...

  6. 40 CFR 90.404 - Test procedure overview.

    Science.gov (United States)

    2010-07-01

    ... mode and five power modes at one speed (rated or intermediate). The test cycle for Class I-A, III, IV... measurement device. The exhaust gases generated during engine operation are sampled either raw or dilute and... fuel consumption. For Phase 2 Class I-B, Class I, and Class II natural gas fueled engines the test is...

  7. 40 CFR 63.425 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... maximum allowable 5-minute pressure increase is 130 mm H2 O (5 in. H2 O). (f) Leak detection test. The leak detection test shall be performed using Method 21, appendix A, 40 CFR part 60, except omit section... between each leak detection. The duration of the purge shall be in excess of two instrument response times...

  8. 40 CFR 63.1046 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ...) National Emission Standards for Oil-Water Separators and Organic-Water Separators § 63.1046 Test methods... vapor leakage could occur) on the cover and associated closure devices shall be checked. Potential leak... test, the cover and closure devices shall be secured in the closed position. (3) The detection...

  9. A procedure for empirical initialization of adaptive testing algorithms

    NARCIS (Netherlands)

    van der Linden, Willem J.

    1997-01-01

    In constrained adaptive testing, the numbers of constraints needed to control the content of the tests can easily run into the hundreds. Proper initialization of the algorithm becomes a requirement because the presence of large numbers of constraints slows down the convergence of the ability

  10. Equating Multidimensional Tests under a Random Groups Design: A Comparison of Various Equating Procedures

    Science.gov (United States)

    Lee, Eunjung

    2013-01-01

    The purpose of this research was to compare the equating performance of various equating procedures for the multidimensional tests. To examine the various equating procedures, simulated data sets were used that were generated based on a multidimensional item response theory (MIRT) framework. Various equating procedures were examined, including…

  11. Short communication. Effect of soybean meal heat procedures on growth performance of broiler chickens

    Energy Technology Data Exchange (ETDEWEB)

    Tousi-Mojarradi, M.; Seidavi, A.; Dadashbeiki, M.; Roca-Fernandez, A. I.

    2014-06-01

    The aim of this research was to study the effect of soybean meal (SBM) heat procedures on growth performance of broiler chickens. A trial was carried out using 200 male Ross 308 strain chickens during 3 feeding periods (starter, grower and finisher, 42 days). The experiment was based on a completely randomized design with 5 treatments giving 4 replications of 10 broilers per treatment. Treatments consisted on: T1 (control, un-processed SBM), T2 (autoclaved SBM: 121 degree centigrade, 20 min), T3 (autoclaved SBM: 121 degree centigrade, 30 min), T4 (roasted SBM: 120 degree centigrade, 20 min) and T5 (microwaved SBM: 46 degree centigrade, 540 watt, 7 min). Growth performance of animals was examined by determining body weight (BW), body weight grain (BWG), feed intake (FI) and feed conversion rate (FCR). Higher BW (p<0.05) and BWG (p<0.05) and lower FCR (p<0.05) were found in broiler chickens fed heat processed SBM diets compared to those fed a raw SBM diet, probably due to higher nutrient availability. However, no differences were found among heat SBM procedures (autoclaving, roasting and microwaving) on growth performance of animals for the starter, grower and finisher periods. From the results of this experiment, it is concluded that further research needs to be developed to establish the effect of temperature-time heat procedures on nutritive value of SBM in terms of levels of anti-nutritional factors (trypsin inhibitor activity and phytic acid) and amino acids profile and its influence on growth performance of broilers. (Author)

  12. Short-duration Electron Precipitation Studied by Test Particle Simulation

    Directory of Open Access Journals (Sweden)

    Jaejin Lee

    2015-12-01

    Full Text Available Energy spectra of electron microbursts from 170 keV to 340 keV have been measured by the solid-state detectors aboard the low-altitude (680 km polar-orbiting Korean STSAT-1 (Science and Technology SATellite. These measurements have revealed two important characteristics unique to the microbursts: (1 They are produced by a fast-loss cone-filling process in which the interaction time for pitch-angle scattering is less than 50 ms and (2 The e-folding energy of the perpendicular component is larger than that of the parallel component, and the loss cone is not completely filled by electrons. To understand how wave-particle interactions could generate microbursts, we performed a test particle simulation and investigated how the waves scattered electron pitch angles within the timescale required for microburst precipitation. The application of rising-frequency whistler-mode waves to electrons of different energies moving in a dipole magnetic field showed that chorus magnetic wave fields, rather than electric fields, were the main cause of microburst events, which implied that microbursts could be produced by a quasi-adiabatic process. In addition, the simulation results showed that high-energy electrons could resonate with chorus waves at high magnetic latitudes where the loss cone was larger, which might explain the decreased e-folding energy of precipitated microbursts compared to that of trapped electrons.

  13. Development of a Short Form of the Boston Naming Test for Individuals with Aphasia

    Science.gov (United States)

    del Toro, Christina M.; Bislick, Lauren P.; Comer, Matthew; Velozo, Craig; Romero, Sergio; Rothi, Leslie J. Gonzalez; Kendall, Diane L.

    2011-01-01

    Purpose: The purpose of this study was to develop a short form of the Boston Naming Test (BNT; Kaplan, Goodglass, & Weintraub, 2001) for individuals with aphasia and compare it with 2 existing short forms originally analyzed with responses from people with dementia and neurologically healthy adults. Method: Development of the new BNT-Aphasia Short…

  14. Thirteen years test experience with short-circuit withstand capability of large power transformers

    NARCIS (Netherlands)

    Smeets, R.P.P.; Paske, te L.H.; Leufkens, P.P.; Fogelberg, T.

    2009-01-01

    The ability to withstand a short circuit is recognised more and more as an essential characteristic of power transformers. IEC and IEEE Standards, as well as other national standards specify short-circuit testing and how to check the withstand capability. Unfortunately, however, there is extensive

  15. Investigation into the comparative severity of practical thermal test procedures

    International Nuclear Information System (INIS)

    Shultz, K.R.; White, M.C.; Gordon, G.

    In the advisory material for the application of the IAEA Transport Regulations three methods for determining whether a type B radioactive material packaging can withstand hypothetical fire conditions are presented. These comprise an open fire test and two tests involving exposure of the packaging in a furnace. The first furnace test (method I) uses a materials testing type of furnace and the second (method II) uses a heat-treatment furnace. Under method I the packaging is heated for 35 minutes from ambient temperature by firing the furnace so that its temperature increases in accordance with an ISO standard fire curve; under method II the heating is for 30 minutes at 800 0 C. Tests were carried out to detarmine if these tests were of comparable severity, and on which temperature the control of furnace firing in method I should be based. It was concluded that method II was the more severe test, and that furance wall temperatues are the dominant factor in determining heat exchange to specimens in the furnaces used. Furnace walls should meet or exceed the standard fire curve set out in the ISO standard. The characteristics of the furnances and specimens were not sufficiently understood to be able to predict the behaviour of the specimens

  16. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    WANDLING, R.R.

    1999-01-01

    The purpose of this document is to describe tests performed to validate Revision 11.2 of the TMACS Monitor and Control System (TMCACS) and verify that the software functions as intended by design. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  17. MAC mini acceptance test procedure, software Version 3.0

    International Nuclear Information System (INIS)

    Russell, V.K.

    1994-01-01

    The K Basins Materials Accounting (MAC) programs had some major improvements made to it to organize the main-tables by Location, Canister, and Material. This ATP describes how the code was to be tested to verify its correctness

  18. Acceptance test procedure MICON software exhaust fan control modifications; TOPICAL

    International Nuclear Information System (INIS)

    SILVAN, G.R.

    1999-01-01

    This acceptance test verifies the MICON program changes for the new automatic transfer switch ATS-2 alarms, the Closed Loop Cooling isolator status, the CB-3 position alarm, and the alarms for the new emergency fan damper backup air compressor

  19. The Effect of Sample Preparation and Testing Procedure

    African Journals Online (AJOL)

    School of Civil & Environmental Engineering, Addis Ababa Institute of Technology,. 3. Murray Rix ... the application of laboratory testing and ... clay, tropical red clay, lateritic clay and laterite, ..... grading curves using mass and modified mass.

  20. 76 FR 27016 - Evaluating Test Procedures for Voting Systems

    Science.gov (United States)

    2011-05-10

    ... Understanding. Comparative information (e.g., testing results from unidentified machine A, B, and C) may be... and deployment of the equipment. NIST will pay all shipping costs except those not permitted by law...

  1. 40 CFR 86.127-00 - Test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ...); (iii) Simulated solar heat intensity of 850 W/m 2 (see § 86.161-00(d)); and (iv) air flow directed at... species for which emissions measurements are made. For exhaust testing, this requires sampling and...

  2. 40 CFR 86.127-12 - Test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... dry air (approximately 40 percent relative humidity); (iii) Simulated solar heat intensity of 850 W/m2... species for which emissions measurements are made. For exhaust testing, this requires sampling and...

  3. Improvement in Shrimp Hatchery Procedures for Toxicity Tests

    International Nuclear Information System (INIS)

    Nor Azizah Marsiddi; Fazliana Mohd Saaya; Anee Suryani Sued

    2015-01-01

    Toxicity testing of brine shrimp Artemia salina Brine shrimp lethality assay is a screening test to determine half the dose mortality (LC50) for its shrimp given certain herbal extract at a concentration tested. The shrimp child mortality half a dose indicator to determine level of toxicity before further testing done on animal cell culture and animal experiments also on the mouse. The use of new hardware, namely Artemio 1 has increased its shrimp production at a rate that more and faster than the use of the black box hatching previously taken from the method by Solis, 1993. brine shrimp eggs from Artemio mix also easier to use because it contains egg and sea salt have been ready mixed for use in experiments. In conclusion, this method improvements help increase the number of offspring produced shrimp and produce experimental method easier than previous methods. (author)

  4. A bayesian procedure in the context of sequential mastery testing

    Directory of Open Access Journals (Sweden)

    Hans J. Vos

    2000-01-01

    Full Text Available Un procedimiento bayesiano en el contexto de los tests secuenciales de clasificación. El propósito de este artículo consiste en obtener reglas óptimas en los tests secuenciales de clasificación. En un test secuencial de clasificación, la decisión a tomar es clasificar a una persona como maestro, no maestro, o continuar el test y administrar el siguiente ítem. Se aplica la teoría de la decisión secuencial bayesiana; es decir, las reglas óptimas resultan de minimizar las pérdidas esperados posteriores asociadas con todas las posibles reglas de decisión en cada momento de test. La principal ventaja de este acercamiento es que los costes de aplicar el test pueden ser tenidos en cuenta de manera explícita. Se asume el modelo binomial para determinar la probabilidad de respuesta correcta dado un cierto nivel de funcionamiento de la persona. Se adopta una pérdida umbral como función de perdida. El artículo termina con un estudio de simulación en el que la estrategia secuencial bayesiana se compara con otros procedimientos disponibles en la literatura para problemas de decisión similares.

  5. A common short-term memory retrieval rate may describe many cognitive procedures

    Directory of Open Access Journals (Sweden)

    Evie eVergauwe

    2014-03-01

    Full Text Available We examine the relationship between response speed and the number of items in short-term memory in four different paradigms and find evidence for a similar high-speed processing rate of about 25 to 30 items per second (~35 to 40 ms/item. We propose that the similarity of the processing rates across paradigms reflects the operation of a very basic covert memory process, high-speed retrieval, that is involved in both the search for information in STM and the reactivation or refreshing of information that keeps it in STM. We link this process to a specific pattern of rhythmic, repetitive neural activity in the brain (gamma oscillations. This proposal generates ideas for research and calls for an integrative approach that combines neuroscientific measures with behavioral cognitive techniques.

  6. Revision to dedicated short range communication roadside equipment specification - RSU 4.1.Bench Test Plan.

    Science.gov (United States)

    2017-04-28

    The document describes the overall process for evaluating Dedicated Short Range Communication (DSRC) Roadside Units (RSU) against USDOT RSU Specification 4.1 in preparation for field evaluation. The Test Cases contained in this document only evaluate...

  7. Single specimen fracture toughness determination procedure using instrumented impact test

    International Nuclear Information System (INIS)

    Rintamaa, R.

    1993-04-01

    In the study a new single specimen test method and testing facility for evaluating dynamic fracture toughness has been developed. The method is based on the application of a new pendulum type instrumented impact tester equipped with and optical crack mouth opening displacement (COD) extensometer. The fracture toughness measurement technique uses the Double Displacement Ratio (DDR) method, which is based on the assumption that the specimen is deformed as two rigid arms that rotate around an apparent centre of rotation. This apparent moves as the crack grows, and the ratio of COD versus specimen displacement changes. As a consequence the onset ductile crack initiation can be detected on the load-displacement curve. Thus, an energy-based fracture toughness can be calculated. In addition the testing apparatus can use specimens with the Double ligament size as compared with the standard Charpy specimen which makes the impact testing more appropriate from the fracture mechanics point of view. The novel features of the testing facility and the feasibility of the new DDR method has been verified by performing an extensive experimental and analytical study. (99 refs., 91 figs., 27 tabs.)

  8. A simplified test procedure for determining the effectiveness of adsorbents for the removal of methyl iodide

    International Nuclear Information System (INIS)

    Underhill, D.W.

    1993-01-01

    ASTM Test Procedure D3803 measures the ability of nuclear-grade carbon to remove methyl iodide from a stream of humidified air. This test, unlike all the other procedures developed by ASTM Committee D28, has evolved to become extremely complex. The intricacy of this test as well as the great difficulty in obtaining inter-laboratory agreement, creates doubt as tot the actual meaning of the results. Here a far simpler test system is described in which thermodynamic principles are used to maintain a constant, reproducible test procedure. This paper describes a system implementing these elements, its cost to build, and the factors affecting its accuracy. 11 refs., 1 fig

  9. Operability test procedure for 244-U DCRT. Revision 1

    International Nuclear Information System (INIS)

    Erhart, M.F.

    1995-01-01

    This OPT will insure the operability of various systems and their general equipment, used in the operation of the 244-U DCRT. Systems that will be tested include the following: Leak Detection Systems; Heat Trace System; Vessel Temperature Measurement System; Dip Tube Water System; Weight Factor and Specific Gravity System; Instrument Air System; Vessel Liquid Level System; Vessel Liquid Transfer System; and Exhauster Differential Pressure Indicating Controller System. The tests will cover checks on equipment operation and electrical interlocks, but will not cover checks on associated annunciator alarms which are covered in a separate OTP

  10. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop

  11. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''P''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  12. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop

  13. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  15. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  16. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''Q''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  17. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''T''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  18. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  19. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  20. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''U''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  1. Within-day variability on short and long walking tests in persons with multiple sclerosis

    NARCIS (Netherlands)

    Feys, P.; Bibby, B.; Romberg, A.; Santoyo, C.; Gebara, B.; de Noordhout, B.M.; Knuts, K.; Bethoux, F.; Skjerbaek, A.; Jensen, E.; Baert, I.; Vaney, C.; de Groot, V.; Dalgas, U.

    2014-01-01

    Objective To compare within-day variability of short (10 m walking test at usual and fastest speed; 10MWT) and long (2 and 6-minute walking test; 2MWT/6MWT) tests in persons with multiple sclerosis. Design Observational study. Setting MS rehabilitation and research centers in Europe and US within

  2. 40 CFR 63.750 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... method in production on actual production parts or assemblies for a period of time sufficient to coat an... a laboratory or pilot production area, using parts and coatings representative of the process(es) where the alternative method is to be used. The laboratory test will use the same part configuration(s...

  3. 16 CFR 1632.5 - Mattress pad test procedure.

    Science.gov (United States)

    2010-01-01

    ... 1632.5 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION FLAMMABLE FABRICS ACT REGULATIONS... substrate. (b) Flame resistant mattress pads. The following additional requirements shall be applicable to mattress pads which contain a chemical fire retardant. (1) These mattress pads shall be tested in...

  4. 40 CFR 90.408 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ....408 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... during service accumulation is allowed only in accordance with § 90.118. (b) Engine pre-test preparation... by § 90.324(a). If necessary, allow the heated sample line, filters, and pumps to reach operating...

  5. 40 CFR 91.408 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ....408 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with the..., including the sample probe, using mode 1 from Table 2 in appendix A of this subpart. The emission sampling...

  6. 47 CFR 11.61 - Tests of EAS procedures.

    Science.gov (United States)

    2010-10-01

    ... class D non-commercial educational FM and analog and digital LPTV stations are required to transmit only... and times on all channels. (ii) DBS providers, analog and digital class D non-commercial educational... stations must conduct these tests on all audio streams. Effective December 31, 2006, DTV stations must...

  7. A Test Procedure for Determining Models of LV Equipment

    NARCIS (Netherlands)

    Cuk, Vladimir; Cobben, Joseph F.G.; Kling, Wil L.; Timens, R.B.; Leferink, Frank Bernardus Johannes

    2009-01-01

    An automated test technique for determining parameters of low voltage equipment is presented in the paper. The aim of this research is to obtain simple models of household, office and industrial equipment which could be used to predict power quality problems during the design of low voltage

  8. 40 CFR 600.111-80 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... the end of the second cycle. (g) Engine starting and restarting. (1) If the engine is not running at... vehicle contain a record of the action. (h) Dynamometer test run. The following steps must be taken for... under-vehicle cooling and for controlling high tire or brake temperatures during dynamometer operation...

  9. Start-Stop Test Procedures on the PEMFC Stack Level

    DEFF Research Database (Denmark)

    Mitzel, Jens; Nygaard, Frederik; Veltzé, Sune

    The test is addressed to investigate the influence on stack durability of a long stop followed by a restart of a stack. Long stop should be defined as a stop in which the anodic compartment is fully filled by air due to stack leakages. In systems, leakage level of the stack is low and time to fil...

  10. 40 CFR 63.1257 - Test methods and compliance procedures.

    Science.gov (United States)

    2010-07-01

    ... chemical engineering principles, measurable process parameters, or physical or chemical laws or properties... flow rate and concentration; temperature; and the reaction kinetics of the constituents with the... Method 8260 or 8270 in “Test Methods for Evaluating Solid Waste, Physical/Chemical Methods,” EPA...

  11. 40 CFR 136.3 - Identification of test procedures.

    Science.gov (United States)

    2010-07-01

    ... availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register... density of the water sample. 8 When the MF method has been used previously to test waters with high... Wastewater, 15th Edition. 31 For samples known or suspected to contain high levels of silver (e.g., in excess...

  12. 40 CFR 86.334-79 - Test procedure overview.

    Science.gov (United States)

    2010-07-01

    ... cycle and 1 hot cycle. The Diesel engine test consists of 3 idle modes and 5 power modes at each of 2... to be conducted on an engine dynamometer. The exhaust gases generated during engine operation are... determination of the concentration of each pollutant, the fuel flow and the power output during each mode. The...

  13. 40 CFR 89.404 - Test procedure overview.

    Science.gov (United States)

    2010-07-01

    ... engine operating conditions to be conducted on an engine dynamometer. The exhaust gases, generated raw or... matter. For more information on particulate matter sampling see § 89.112(c). The test cycles consist of... (raw analysis), and the power output during each mode. The measured values are weighted and used to...

  14. 21 CFR 352.72 - General testing procedures.

    Science.gov (United States)

    2010-04-01

    ... required. (g) Number of subjects. A test panel shall consist of not more than 25 subjects with the number fixed in advance by the investigator. From this panel, at least 20 subjects must produce valid data for... administered the doses of UV radiation. After UV radiation exposure from the solar simulator is completed, all...

  15. 49 CFR 572.142 - Head assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... acceleration versus time history curve shall be unimodal, and the oscillations occurring after the main pulse... for testing. (3) Suspend the head assembly with its midsagittal plane in vertical orientation as shown... head in transverse alignment with the CG, shall be used to ensure that the head transverse plane is...

  16. 40 CFR 85.1414 - Alternative test procedures.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Urban Bus Rebuild Requirements § 85.1414 Alternative... shall be representative of in-use urban bus operation. The requestor shall supply relevant technical... test is representative of in-use urban bus operation, the Agency shall determine whether to set such...

  17. 40 CFR 60.46 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... material balance over the steam generating system shall be used to confirm the rate. (d) The owner or...-Fired Steam Generators for Which Construction Is Commenced After August 17, 1971 § 60.46 Test methods... D2015, or D5865 (solid fuels), D240 (liquid fuels), or D1826 (gaseous fuels) (all of these methods are...

  18. MAC mini acceptance test procedures, software Version 3.3

    International Nuclear Information System (INIS)

    Russell, V.K.

    1994-01-01

    The K Basins Materials Accounting (MAC) programs had some improvements made to it to to change slightly the access authorized users had to the modification of critical data. This ATP describes how the code was to be tested to verify its correctness

  19. 76 FR 47178 - Energy Efficiency Program: Test Procedure for Lighting Systems (Luminaires)

    Science.gov (United States)

    2011-08-04

    ... DEPARTMENT OF ENERGY [Docket Number EERE-2011-BT-TP-0041] RIN 1904-AC50 Energy Efficiency Program: Test Procedure for Lighting Systems (Luminaires) AGENCY: Office of Energy Efficiency and Renewable... (``DOE'' or the ``Department'') is currently evaluating energy efficiency test procedures for luminaires...

  20. 10 CFR 431.16 - Test procedures for the measurement of energy efficiency.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for the measurement of energy efficiency. 431.16 Section 431.16 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR... Methods of Determining Efficiency § 431.16 Test procedures for the measurement of energy efficiency. For...

  1. 75 FR 42579 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens; Repeal of...

    Science.gov (United States)

    2010-07-22

    ... provided in paragraph (i)(2) of this section, for each basic model of conventional cooking tops, and... the cooking efficiency test procedure for microwave ovens under the Energy Policy and Conservation Act (EPCA). DOE has determined that the microwave oven test procedure to measure the cooking efficiency does...

  2. 16 CFR 1611.33 - Test procedures for textile fabrics and film.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for textile fabrics and film... REGULATIONS STANDARD FOR THE FLAMMABILITY OF VINYL PLASTIC FILM Rules and Regulations § 1611.33 Test procedures for textile fabrics and film. (a)(1) All textile fabrics (except those with a nitro-cellulose...

  3. 76 FR 12825 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens

    Science.gov (United States)

    2011-03-09

    ... Conservation Program for Consumer Products: Test Procedure for Microwave Ovens AGENCY: Office of Energy.... Department of Energy (DOE) is amending its test procedures for microwave ovens under the Energy Policy and Conservation Act (EPCA) to provide for the measurement of standby mode and off mode power use by microwave...

  4. 75 FR 42612 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens

    Science.gov (United States)

    2010-07-22

    ... Conservation Program for Consumer Products: Test Procedure for Microwave Ovens AGENCY: Office of Energy... (NOPR) in which DOE proposed test procedures for microwave ovens under the Energy Policy and Conservation Act (EPCA) to measure standby mode and off mode power use by microwave ovens. To address issues...

  5. 78 FR 4015 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2013-01-18

    ... Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable... microwave ovens. That SNOPR proposed amendments to the DOE test procedure to incorporate provisions from the... energy use of products that combine a microwave oven with other appliance functionality, as well as minor...

  6. 75 FR 42611 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens

    Science.gov (United States)

    2010-07-22

    ... for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy... current active mode provisions in its test procedure for microwave ovens do not produce accurate and... concerns with the DOE microwave oven cooking efficiency test procedure. Elsewhere in today's Federal...

  7. A FLOW-THROUGH TESTING PROCEDURE WITH DUCKWEED (LEMNA MINOR L.)

    Science.gov (United States)

    Lemna minor is one of the smallest flowering plants. Because of its floating habit, ease of culture, and small size it is well adapted for laboratory investigations. Procedures for flow-through tests were developed. Testing procedures were developed with this apparatus. By using ...

  8. 77 FR 28673 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnace Fans

    Science.gov (United States)

    2012-05-15

    ... multipliers based on climate, consumer behavior assumptions, and product characteristics (e.g., multi-stage or... Conservation Program for Consumer Products: Test Procedures for Residential Furnace Fans; Proposed Rule #0;#0... Conservation Program for Consumer Products: Test Procedures for Residential Furnace Fans AGENCY: Office of...

  9. 40 CFR 86.1327-96 - Engine dynamometer test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... device, the exhaust pipe must be the same diameter as found in-use for at least 4 pipe diameters upstream... Exhaust Test Procedures § 86.1327-96 Engine dynamometer test procedures; overview. (a) The engine.... The exhaust emissions are diluted with ambient air and a continuous proportional sample is collected...

  10. 40 CFR Appendix A to Subpart T of... - Test of Solvent Cleaning Procedures

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Test of Solvent Cleaning Procedures A... CATEGORIES National Emission Standards for Halogenated Solvent Cleaning Pt. 63, Subpt. T, App. A Appendix A to Subpart T of Part 63—Test of Solvent Cleaning Procedures General Questions ___ 1. What is the...

  11. 75 FR 38422 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-07-02

    ... 2105-AD84 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of..., 2011. DATES: This rule is effective July 2, 2010. FOR FURTHER INFORMATION CONTACT: For program issues... Federal Regulations, as follows: PART 40--PROCEDURES FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING...

  12. CENRTC Project number-sign 2F3EOA, OCB A-376, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3E0A, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00041/M. This procedure separates three tests into separate sections: energization of A-376 duplex panel and circuits; SCADA tests; and A-376 local trip tests

  13. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    Energy Technology Data Exchange (ETDEWEB)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    The U.S. Department of Energy tasked NREL to develop a process for testing the reliability of models that predict retrofit energy savings, including their associated calibration methods. DOE asked NREL to conduct the work in phases so that a test procedure would be ready should DOE need it to meet legislative requirements related to residential retrofits in FY 2010. This report documents the initial 'Phase 1' test procedure.

  14. Loss of Accuracy of Torque Wrenches Due to Clinical Use and Cleaning Procedure : Short Communication

    NARCIS (Netherlands)

    Stroosnijder, Egbert; Gresnigt, Marco Mm; Meisberger, Eric W; Cune, Marco S

    PURPOSE: The aim of this study was to investigate the way intensive use and multiple cleanings of torque wrenches may interfere with accurary over time. MATERIALS AND METHODS: Three different brands (one spring-style and two friction-style types) were tested at baseline and after enduring mechanical

  15. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  16. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  17. Study of test procedure to evaluate airbag deployment force; Airbag tenkairyoku no hyoka shuho no kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Kamiji, K.; Fukuda, K.; Morita, K. [Honda Motor Co. Ltd., Tokyo (Japan)

    1998-05-01

    Discussions were given on airbags equipped in passenger cars as to methods of evaluating their deployment injuries. Airbag deployment injuries occur in occupants being out of position. In a driver`s seat, an injury may occur when an air bag deploys under a condition that a driver with relatively short body height gets closer to a steering wheel to maintain the driving posture. In a front passenger seat, if a child is not held in a restraint equipment, the child may be blown off into the vicinity of the airbag, whose deployment can cause an injury. According to the result of a test performed on a driver being out of position, the test method using a hybrid 3 dummy specified in the present ISO procedure may not necessarily be said to produce an evaluation on the worst case. In order to solve the problem, an ATD dummy which can measure bend in each rib independently would be used, or the hybrid 3 dummy must be measured in the worst set position. 4 refs., 8 figs.

  18. Comparison of likelihood testing procedures for parallel systems with covariances

    International Nuclear Information System (INIS)

    Ayman Baklizi; Isa Daud; Noor Akma Ibrahim

    1998-01-01

    In this paper we considered investigating and comparing the behavior of the likelihood ratio, the Rao's and the Wald's statistics for testing hypotheses on the parameters of the simple linear regression model based on parallel systems with covariances. These statistics are asymptotically equivalent (Barndorff-Nielsen and Cox, 1994). However, their relative performances in finite samples are generally known. A Monte Carlo experiment is conducted to stimulate the sizes and the powers of these statistics for complete samples and in the presence of time censoring. Comparisons of the statistics are made according to the attainment of assumed size of the test and their powers at various points in the parameter space. The results show that the likelihood ratio statistics appears to have the best performance in terms of the attainment of the assumed size of the test. Power comparisons show that the Rao statistic has some advantage over the Wald statistic in almost all of the space of alternatives while likelihood ratio statistic occupies either the first or the last position in term of power. Overall, the likelihood ratio statistic appears to be more appropriate to the model under study, especially for small sample sizes

  19. MBA acceptance test procedures, software Version 1.4

    International Nuclear Information System (INIS)

    Mullaney, J.E.; Russell, V.K.

    1994-01-01

    The Mass Balance Program (MBA) is an adjunct to the Materials Accounting database system, Version 3.4. MBA was written to equip the personnel performing K-Basin encapsulation tasks with a conservative estimate of accumulated sludge during the processing of canisters into and out of the chute. The K Basins Materials Balance programs had some minor improvements made to it to feedback the chute processing status to the operator better. This ATP describes how the code was to be tested to verify its correctness

  20. Short-term outcomes of the transvaginal minimal mesh procedure for pelvic organ prolapse

    Directory of Open Access Journals (Sweden)

    Naoko Takazawa

    2018-03-01

    Full Text Available Purpose: This study aimed to evaluate the clinical outcomes and complications of transvaginal minimal mesh repair without using commercially available kits for treatment of pelvic organ prolapse (POP. Materials and Methods: This retrospective cohort study involved 91 women who underwent surgical management of POP with originally designed small mesh between July 2014 and August 2015. This mesh is 56% smaller than the mesh widely used in Japan, and it has only two arms delivered into each right and left sacrospinous ligament. The main study outcome was the anatomic cure rate defined as recurrence of POP quantification (POP-Q stage II or more. We also assessed changes in the overactive bladder symptom score (OABSS and prolapse quality of life questionnaire (P-QOL and evaluated adverse events. Finally, we compared patient backgrounds between the patients with and without recurrence. Results: Prolapse recurred in 10 of 91 patients (11.0%, and all patients with recurrence were diagnosed as POP-Q stage II. As adverse events, only mesh erosion occurred in two (2.2% and pelvic pain in one (1.1% of the 91 patients. The OABSS and P-QOL were significantly improved by the operation. When we compared patient backgrounds between the patients with and without recurrence, body mass index was the only factor influencing affecting recurrence. Conclusions: Transvaginal minimal mesh repair resulted in successful outcomes with low mesh-related complications and anatomic recurrence at one year. Furthermore, significant improvement in QOL was offered by this procedure. Our minimal mesh technique should be considered as one treatment option for the management of POP.

  1. Short-term outcomes of the transvaginal minimal mesh procedure for pelvic organ prolapse.

    Science.gov (United States)

    Takazawa, Naoko; Fujisaki, Akiko; Yoshimura, Yasukuni; Tsujimura, Akira; Horie, Shigeo

    2018-03-01

    This study aimed to evaluate the clinical outcomes and complications of transvaginal minimal mesh repair without using commercially available kits for treatment of pelvic organ prolapse (POP). This retrospective cohort study involved 91 women who underwent surgical management of POP with originally designed small mesh between July 2014 and August 2015. This mesh is 56% smaller than the mesh widely used in Japan, and it has only two arms delivered into each right and left sacrospinous ligament. The main study outcome was the anatomic cure rate defined as recurrence of POP quantification (POP-Q) stage II or more. We also assessed changes in the overactive bladder symptom score (OABSS) and prolapse quality of life questionnaire (P-QOL) and evaluated adverse events. Finally, we compared patient backgrounds between the patients with and without recurrence. Prolapse recurred in 10 of 91 patients (11.0%), and all patients with recurrence were diagnosed as POP-Q stage II. As adverse events, only mesh erosion occurred in two (2.2%) and pelvic pain in one (1.1%) of the 91 patients. The OABSS and P-QOL were significantly improved by the operation. When we compared patient backgrounds between the patients with and without recurrence, body mass index was the only factor influencing affecting recurrence. Transvaginal minimal mesh repair resulted in successful outcomes with low mesh-related complications and anatomic recurrence at one year. Furthermore, significant improvement in QOL was offered by this procedure. Our minimal mesh technique should be considered as one treatment option for the management of POP.

  2. Short Operative Duration and Surgical Site Infection Risk in Hip and Knee Arthroplasty Procedures.

    Science.gov (United States)

    Dicks, Kristen V; Baker, Arthur W; Durkin, Michael J; Anderson, Deverick J; Moehring, Rebekah W; Chen, Luke F; Sexton, Daniel J; Weber, David J; Lewis, Sarah S

    2015-12-01

    To determine the association (1) between shorter operative duration and surgical site infection (SSI) and (2) between surgeon median operative duration and SSI risk among first-time hip and knee arthroplasties. Retrospective cohort study A total of 43 community hospitals located in the southeastern United States. Adults who developed SSIs according to National Healthcare Safety Network criteria within 365 days of first-time knee or hip arthroplasties performed between January 1, 2008 and December 31, 2012. Log-binomial regression models estimated the association (1) between operative duration and SSI outcome and (2) between surgeon median operative duration and SSI outcome. Hip and knee arthroplasties were evaluated in separate models. Each model was adjusted for American Society of Anesthesiology score and patient age. A total of 25,531 hip arthroplasties and 42,187 knee arthroplasties were included in the study. The risk of SSI in knee arthroplasties with an operative duration shorter than the 25th percentile was 0.40 times the risk of SSI in knee arthroplasties with an operative duration between the 25th and 75th percentile (risk ratio [RR], 0.40; 95% confidence interval [CI], 0.38-0.56; Poperative duration did not demonstrate significant association with SSI for hip arthroplasties (RR, 1.04; 95% CI, 0.79-1.37; P=.36). Knee arthroplasty surgeons with shorter median operative durations had a lower risk of SSI than surgeons with typical median operative durations (RR, 0.52; 95% CI, 0.43-0.64; Poperative durations were not associated with a higher SSI risk for knee or hip arthroplasty procedures in our analysis.

  3. Apparatus and Experimental Procedures to Test Crystal Collimation

    CERN Document Server

    Montesano, S

    2012-01-01

    UA9 is an experimental setup operated in the CERN-SPS in view of investigating the feasibility of halo collimation assisted by bent crystals. The test collimation system is composed of one crystal acting as primary halo deflector in the horizontal plane and an absorber. Different crystals are tested in turn using two-arm goniometers with an angular reproducibility of better than 10 microrad. The performance of the system is assessed through the study of the secondary and tertiary halo in critical areas, by using standard machine instrumentation and few customized equipments. The alignment of the crystal is verified by measuring the loss rate close to the crystal position. The collimation efficiency is computed by intercepting the deflected halo with a massive collimator or with an imaging device installed into a Roman Pot. The leakage of the system is evaluated in the dispersion suppressor by means of movable aperture restrictions. In this contribution the setup and the experimental methods in use are revisit...

  4. Test of a mosquito eggshell isolation method and subsampling procedure.

    Science.gov (United States)

    Turner, P A; Streever, W J

    1997-03-01

    Production of Aedes vigilax, the common salt-marsh mosquito, can be assessed by determining eggshell densities found in soil. In this study, 14 field-collected eggshell samples were used to test a subsampling technique and compare eggshell counts obtained with a flotation method to those obtained by direct examination of sediment (DES). Relative precision of the subsampling technique was assessed by determining the minimum number of subsamples required to estimate the true mean and confidence interval of a sample at a predetermined confidence level. A regression line was fitted to cube-root transformed eggshell counts obtained from flotation and DES and found to be significant (P eggshells present. Eggshells obtained with the flotation method can be used to predict those from DES using the following equation: DES count = [1.386 x (flotation count)0.33 - 0.01]3.

  5. Project B610 process control configuration acceptance test procedure

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1994-01-01

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator's console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A

  6. Operability test procedure for TRUSAF assayer software upgrade

    International Nuclear Information System (INIS)

    Cejka, C.C.

    1995-01-01

    This OTP is to be used to ensure the operability of the Transuranic Waste Assay System (TRUWAS). The system was upgraded and requires a retest to assure satisfactory operation. The upgrade consists of an AST 486 computer to replace the IBM-PC/XT, and a software upgrade (CNEUT). The software calculations are performed in the same manner as in the previous system (NEUT), however, the new software is written in C Assembly Language. CNEUT is easier to use and far more powerful than the previous program. The TRUWAS is used to verify the TRU content of waste packages sent for storage in the Transuranic Storage and Assay Facility (TRUSAF). The TRUSAF is part of Westinghouse Hanford's certification program for waste to be shipped to the Waste Isolation Pilot Plant (WIPP) in New Mexico. The Transuranic Waste Assayer uses a combination passive-active neutron interrogation system to determine the TRU content of 55-gallon waste drums. The system consists of a shielded assay chamber; Deuterium-Tritium neutron generator; Helium-3 proportional counters; drum handling system; electronics including preamplifier, amplifier, and discriminator for each of the counter packages; and an AST 486 computer/printer system for data acquisition and analysis. The system can detect down to TRU levels of 10 nCi/g in the waste matrix. The equipment to be tested is: Assay Chamber Door Drum Turntable and Automatic Loading Platform Interlocks Assayer Software; and IBM computer/printer software. The objective of the test is to verify that the system is operational with the AST 486 computer, the software used in the new computer system correctly calculates TRU levels, and the new computer system is capable of storing and retrieving data

  7. Ultra-high accuracy optical testing: creating diffraction-limited short-wavelength optical systems

    International Nuclear Information System (INIS)

    Goldberg, Kenneth A.; Naulleau, Patrick P.; Rekawa, Senajith B.; Denham, Paul E.; Liddle, J. Alexander; Gullikson, Eric M.; Jackson, KeithH.; Anderson, Erik H.; Taylor, John S.; Sommargren, Gary E.; Chapman, Henry N.; Phillion, Donald W.; Johnson, Michael; Barty, Anton; Soufli, Regina; Spiller, Eberhard A.; Walton, Christopher C.; Bajt, Sasa

    2005-01-01

    Since 1993, research in the fabrication of extreme ultraviolet (EUV) optical imaging systems, conducted at Lawrence Berkeley National Laboratory (LBNL) and Lawrence Livermore National Laboratory (LLNL), has produced the highest resolution optical systems ever made. We have pioneered the development of ultra-high-accuracy optical testing and alignment methods, working at extreme ultraviolet wavelengths, and pushing wavefront-measuring interferometry into the 2-20-nm wavelength range (60-600 eV). These coherent measurement techniques, including lateral shearing interferometry and phase-shifting point-diffraction interferometry (PS/PDI) have achieved RMS wavefront measurement accuracies of 0.5-1-(angstrom) and better for primary aberration terms, enabling the creation of diffraction-limited EUV optics. The measurement accuracy is established using careful null-testing procedures, and has been verified repeatedly through high-resolution imaging. We believe these methods are broadly applicable to the advancement of short-wavelength optical systems including space telescopes, microscope objectives, projection lenses, synchrotron beamline optics, diffractive and holographic optics, and more. Measurements have been performed on a tunable undulator beamline at LBNL's Advanced Light Source (ALS), optimized for high coherent flux; although many of these techniques should be adaptable to alternative ultraviolet, EUV, and soft x-ray light sources. To date, we have measured nine prototype all-reflective EUV optical systems with NA values between 0.08 and 0.30 (f/6.25 to f/1.67). These projection-imaging lenses were created for the semiconductor industry's advanced research in EUV photolithography, a technology slated for introduction in 2009-13. This paper reviews the methods used and our program's accomplishments to date

  8. Acceptance test procedure for the 105-KW isolation barrier leak rate

    International Nuclear Information System (INIS)

    McCracken, K.J.

    1995-01-01

    This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals. This Acceptance Test Procedure (ATP) has been prepared in accordance with CM-6-1 EP 4.2, Standard Engineering Practices

  9. Validation of IEEE P1547.1 Interconnection Test Procedures: ASCO 7000 Soft Load Transfer System

    Energy Technology Data Exchange (ETDEWEB)

    Kroposki, B.; Englebretson, S.; Pink, C.; Daley, J.; Siciliano, R.; Hinton, D.

    2003-09-01

    This report presents the preliminary results of testing the ASCO 7000 Soft Load Transfer System according to IEEE P1547.1 procedures. The ASCO system interconnects synchronous generators with the electric power system and provides monitoring and control for the generator and grid connection through extensive protective functions. The purpose of this testing is to evaluate and give feedback on the contents of IEEE Draft Standard P1547.1 Conformance Tests Procedures for Equipment Interconnecting Distributed Resources With Electric Power Systems.

  10. Test procedures for polyester immobilized salt-containing surrogate mixed wastes

    International Nuclear Information System (INIS)

    Biyani, R.K.; Hendrickson, D.W.

    1997-01-01

    These test procedures are written to meet the procedural needs of the Test Plan for immobilization of salt containing surrogate mixed waste using polymer resins, HNF-SD-RE-TP-026 and to ensure adequacy of conduct and collection of samples and data. This testing will demonstrate the use of four different polyester vinyl ester resins in the solidification of surrogate liquid and dry wastes, similar to some mixed wastes generated by DOE operations

  11. Short-term effect of TVT-SECUR procedure on quality of life and sexual function in women with stress urinary incontinence.

    Science.gov (United States)

    Tang, Xiang; Zhu, Lan; Zhong, Wen; Li, Bin; Lang, Jinghe

    2013-01-01

    To investigate whether patient quality of life and sexual function are improved after the tension-free vaginal tape SECUR (TVT-S) procedure (H-type). Prospective study (Canadian Task Force classification II-3). Single-center hospital. Thirty-three women with stress urinary incontinence (SUI) (high urethral mobility) and no concomitant pelvic floor prolapse underwent TVT-S between October 2009 and October 2011. TVT-S procedure. Before and after surgery(6 and 12 months), all patients completed the Chinese version of the Incontinence Quality of Life Questionnaire (I-QOL). In addition, 28 sexually active patients who underwent the TVT-S procedure completed the short-form Pelvic Organ Prolapse/Urinary Incontinence Sexual Function Questionnaire (PISQ-12) before and after surgery (6 and 12 months). We used a paired t test to compare I-QOL scores before and after surgery. The Wilcoxon signed-rank test was used to compare the preoperative and postoperative PISQ scores. The objective cure rate was 78% (26 of 33 patients) at 12 months after surgery. The objective improvement rate was 12.1% (4 of 33 patients). The subjective satisfaction rate was 90%. Three operations (9.1%) were considered failures. Two patients underwent a TVT procedure after TVT-S because of recurrence. No patients reported severe pain; the mean (SD) visual analog scale pain score was 1.8 (1.2) after surgery. Only 1 patient (3%) was found to have sling erosion at 12 months postoperatively. The I-QOL score was 28.3 (14.2) before surgery and increased to 69.5 (18.9) at 12 months after the TVT-S procedure. The I-QOL score improved significantly after surgery (p .05). Although the objective cure rate was not high, the TVT-S procedure is a minimally invasive, safe, and effective surgical procedure for treatment of SUI (high urethral mobility) and can improve the quality of life and sexual function in women with SUI. Copyright © 2013 AAGL. Published by Elsevier Inc. All rights reserved.

  12. Microstructure and elemental distribution of americium containing MOX fuel under the short term irradiation tests

    International Nuclear Information System (INIS)

    Tanaka, Kosuke; Hirosawa, Takashi; Obayashi, Hiroshi; Koyama, Shin Ichi; Yoshimochi, Hiroshi; Tanaka, Kenya

    2008-01-01

    In order to investigate the effect of americium addition to MOX fuels on the irradiation behavior, the 'Am-1' program is being conducted in JAEA. The Am-1 program consists of two short term irradiation tests of 10-minute and 24 hour irradiations and a steady-state irradiation test. The short-term irradiation tests were successfully completed and the post irradiation examinations (PIEs) are in progress. The PIEs for Am-containing MOX fuels focused on the microstructural evolution and redistribution behavior of Am at the initial stage of irradiation and the results to date are reported

  13. Short-term in vivo evaluation of zinc-containing calcium phosphate using a normalized procedure

    Energy Technology Data Exchange (ETDEWEB)

    Calasans-Maia, Monica, E-mail: monicacalasansmaia@gmail.com [Dental Clinical Research Center, Dentistry School, Fluminense Federal University, Niteroi, Rio de Janeiro (Brazil); Calasans-Maia, José, E-mail: josecalasans@gmail.com [Dental Clinical Research Center, Dentistry School, Fluminense Federal University, Niteroi, Rio de Janeiro (Brazil); Santos, Silvia, E-mail: silviaquimica@gmail.com [LABIOMAT, Brazilian Center for Physics Research, CBPF, Rio de Janeiro (Brazil); Mavropoulos, Elena, E-mail: elena@cbpf.br [LABIOMAT, Brazilian Center for Physics Research, CBPF, Rio de Janeiro (Brazil); Farina, Marcos, E-mail: mfarina@anato.ufrj.br [Institute of Biomedical Sciences, Federal University of Rio de Janeiro, Rio de Janeiro (Brazil); Lima, Inayá, E-mail: inayacorrea@gmail.com [Nuclear Instrumentation Laboratory, Nuclear Engineering Program, COPPE, Federal University of Rio de Janeiro, Rio de Janeiro (Brazil); Lopes, Ricardo Tadeu [Nuclear Instrumentation Laboratory, Nuclear Engineering Program, COPPE, Federal University of Rio de Janeiro, Rio de Janeiro (Brazil); Rossi, Alexandre, E-mail: rossi@cbpf.br [LABIOMAT, Brazilian Center for Physics Research, CBPF, Rio de Janeiro (Brazil); Granjeiro, José Mauro, E-mail: jmgranjeiro@gmail.com [Dental Clinical Research Center, Dentistry School, Fluminense Federal University, Niteroi, Rio de Janeiro (Brazil); Bioengineering Division, National Institute of Metrology, Quality and Technology, Duque de Caxias, Rio de Janeiro (Brazil)

    2014-08-01

    The effect of zinc-substituted calcium phosphate (CaP) on bone osteogenesis was evaluated using an in vivo normalized ISO 10993-6 protocol. Zinc-containing hydroxyapatite (ZnHA) powder with 0.3% by wt zinc (experimental group) and stoichiometric hydroxyapatite (control group) were shaped into cylindrical implants (2 × 6 mm) and were sintered at 1000 °C. Thermal treatment transformed the ZnHA cylinder into a biphasic implant that was composed of Zn-substituted HA and Zn-substituted β-tricalcium phosphate (ZnHA/βZnTCP); the hydroxyapatite cylinder was a highly crystalline and poorly soluble HA implant. In vivo tests were performed in New Zealand White rabbits by implanting two cylinders of ZnHA/βZnTCP in the left tibia and two cylinders of HA in the right tibia for 7, 14 and 28 days. Incorporation of 0.3% by wt zinc into CaP increased the rate of Zn release to the biological medium. Microfluorescence analyses (μXRF-SR) using synchrotron radiation suggested that some of the Zn released from the biomaterial was incorporated into new bone near the implanted region. In contrast with previous studies, histomorphometric analysis did not show significant differences between the newly formed bone around ZnHA/βZnTCP and HA due to the dissolution profile of Zn-doped CaP. Despite the great potential of Zn-containing CaP matrices for future use in bone regeneration, additional in vivo studies must be conducted to explain the mobility of zinc at the CaP surface and its interactions with a biological medium. - Highlights: • We produced a hydroxyapatite containing a low concentration (0.3 wt.%) of zinc. • The biomaterial underwent characterization before and after in vivo implant. • In vivo tests were performed according to ISO 10993-6. • Zinc-containing calcium phosphate promotes osteoconduction and bone regeneration. • Zinc-containing calcium phosphate may be useful for clinical applications.

  14. Short-term in vivo evaluation of zinc-containing calcium phosphate using a normalized procedure

    International Nuclear Information System (INIS)

    Calasans-Maia, Monica; Calasans-Maia, José; Santos, Silvia; Mavropoulos, Elena; Farina, Marcos; Lima, Inayá; Lopes, Ricardo Tadeu; Rossi, Alexandre; Granjeiro, José Mauro

    2014-01-01

    The effect of zinc-substituted calcium phosphate (CaP) on bone osteogenesis was evaluated using an in vivo normalized ISO 10993-6 protocol. Zinc-containing hydroxyapatite (ZnHA) powder with 0.3% by wt zinc (experimental group) and stoichiometric hydroxyapatite (control group) were shaped into cylindrical implants (2 × 6 mm) and were sintered at 1000 °C. Thermal treatment transformed the ZnHA cylinder into a biphasic implant that was composed of Zn-substituted HA and Zn-substituted β-tricalcium phosphate (ZnHA/βZnTCP); the hydroxyapatite cylinder was a highly crystalline and poorly soluble HA implant. In vivo tests were performed in New Zealand White rabbits by implanting two cylinders of ZnHA/βZnTCP in the left tibia and two cylinders of HA in the right tibia for 7, 14 and 28 days. Incorporation of 0.3% by wt zinc into CaP increased the rate of Zn release to the biological medium. Microfluorescence analyses (μXRF-SR) using synchrotron radiation suggested that some of the Zn released from the biomaterial was incorporated into new bone near the implanted region. In contrast with previous studies, histomorphometric analysis did not show significant differences between the newly formed bone around ZnHA/βZnTCP and HA due to the dissolution profile of Zn-doped CaP. Despite the great potential of Zn-containing CaP matrices for future use in bone regeneration, additional in vivo studies must be conducted to explain the mobility of zinc at the CaP surface and its interactions with a biological medium. - Highlights: • We produced a hydroxyapatite containing a low concentration (0.3 wt.%) of zinc. • The biomaterial underwent characterization before and after in vivo implant. • In vivo tests were performed according to ISO 10993-6. • Zinc-containing calcium phosphate promotes osteoconduction and bone regeneration. • Zinc-containing calcium phosphate may be useful for clinical applications

  15. The first DC performance test and analysis of CC conductor short sample at ASIPP conductor test facility

    International Nuclear Information System (INIS)

    Shi Yi; Wu Yu; Liu Huajun; Long Feng; Qian Li; Ren Zhibin; Li Shaolei; Liu Bo; Chen Jinglin

    2012-01-01

    Highlights: ► In this study the first DC performance experiments of ITER correction coil conductor short sample have been carried out in ASIPP test facility. ► A CC conductor short sample was fabricated and tested to confirm the capability of this test facility for qualification tests of CC conductors. ► There is no obvious impact of cycling on DC performance measurement. ► Those measured results of current sharing temperature are in agreement with the expected results from strand scaling - Abstract: The first DC performance experiments of ITER correction coil (CC) conductor short sample have been carried out in the conductor test facility of Institute of Plasma Physics, CAS (ASIPP) in January this year. Those experiments aim to investigate the DC performance of ITER CC conductor. The tested conductor short sample is bended as a half circle with the diameter of 270 mm to meet the background magnetic field shape. The half circle part of sample is longer than the final twist pitch. The current sharing temperature (T cs ) in the 3.86 T external magnetic field (B ex ), ≤12 kA could be measured including the critical current (I c ) run. There is no obvious impact of 1000 cycles on DC performance. Those measured T cs results are in agreement with the expected results from strand scaling.

  16. A three-stage short-term electric power planning procedure for a generation company in a liberalized market

    International Nuclear Information System (INIS)

    Nabona, Narcis; Pages, Adela

    2007-01-01

    In liberalized electricity markets, generation companies bid their hourly generation in order to maximize their profit. The optimization of the generation bids over a short-term weekly period must take into account the action of the competing generation companies and the market-price formation rules and must be coordinated with long-term planning results. This paper presents a three stage optimization process with a data analysis and parameter calculation, a linearized unit commitment, and a nonlinear generation scheduling refinement. Although the procedure has been developed from the experience with the Spanish power market, with minor adaptations it is also applicable to any generation company participating in a competitive market system. (author)

  17. Test procedures and instructions for Hanford tank waste supernatant cesium removal

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, D.W., Westinghouse Hanford

    1996-05-31

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test using Hanford Double-Shell Slurry Feed supernatant liquor from tank 251-AW-101 in a bench-scale column.Cesium sorbents to be tested include resorcinol-formaldehyde resin and crystalline silicotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-022, Hanford Tank Waste Supernatant Cesium Removal Test Plan.

  18. Test procedures and instructions for Hanford complexant concentrate supernatant cesium removal using CST

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, D.W.

    1997-01-08

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test, using Hanford Complexant Concentrate supernatant liquor from tank 241-AN-107, in a bench-scale column. The cesium sorbent to be tested is crystalline silicotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-023, Hanford Complexant Concentrate Supernatant Cesium Removal Test Plan.

  19. ProSeal laryngeal mask airway: An alternative to endotracheal intubation in paediatric patients for short duration surgical procedures

    Directory of Open Access Journals (Sweden)

    Jaya Lalwani

    2010-01-01

    Full Text Available The laryngeal mask airway (LMA is a supraglottic airway management device. The LMA is preferred for airway management in paediatric patients for short duration surgical procedures. The recently introduced ProSeal (PLMA, a modification of Classic LMA, has a gastric drainage tube placed lateral to main airway tube which allows the regurgitated gastric contents to bypass the glottis and prevents the pulmonary aspiration. This study was done to compare the efficacy of ProSeal LMA with an endotracheal tube in paediatric patients with respect to number of attempts for placement of devices, haemodynamic responses and perioperative respiratory complications. Sixty children, ASA I and II, weighing 10-20 kg between 2 and 8 years of age group of either sex undergoing elective ophthalmological and lower abdominal surgeries of 30-60 min duration, randomly divided into two groups of 30 patients each were studied. The number of attempts for endotracheal intubation was less than the placement of PLMA. Haemodynamic responses were significantly higher (P<0.05 after endotracheal intubation as compared to the placement of PLMA. There were no significant differences in mean SpO 2 (% and EtCO 2 levels recorded at different time intervals between the two groups. The incidence of post-operative respiratory complications cough and bronchospasm was higher after extubation than after removal of PLMA. The incidence of soft tissue trauma was noted to be higher for PLMA after its removal. There were no incidences of aspiration and hoarseness/sore throat in either group. It is concluded that ProSeal LMA can be safely considered as a suitable and effective alternative to endotracheal intubation in paediatric patients for short duration surgical procedures.

  20. The sensitivity testing of Wilms' tumors to cytostatic agents with an autoradiographic in vitro short-term test

    International Nuclear Information System (INIS)

    Willnow, U.

    1984-01-01

    Sensitivity of 15 Wilms' tumors in children was tested towards cytostatic agents in vitro by means of an autoradiographic short-term test. Sensitivity was measured as the magnitude of the inhibition of 3 H-thymidine or 3 H-uridine incorporation. The test was performed with Adriamycin, Actinomycin D, Daunomycin, Bleomycin, Cyclophosphamide, Ifosfamide, Trenimon, and Arabinosylcytosine. None of the tumors is resistant to all substances, they are responsive against 2 or more drugs. The most effective drugs tested are Adriamycin, Actinomycin D and Cyclophosphamide. The tumors show a marked individual sensitivity pattern. This behavior is explained mainly by the usually high proliferative activity of Wilms' tumors. The possibilities and limits of long-term and short-term methods for sensitivity testing are discussed critically. For the evaluation of the results of in vitro testing and in vivo effectiveness the close correlation should be considered between the type of cytostatic agent and proliferation kinetics of the tumor, cytostatic agent and effect on tumor metabolism as well as the effect of the cytostatics and the nucleic acid precursors used for the short-term test. Despite the methodological limitations preclinical testing should be preferred to unselected chemotherapy. (author)

  1. Test Procedure for Axially Loaded Bucket Foundations in Sand (Large Yellow Box)

    DEFF Research Database (Denmark)

    Vaitkunaite, Evelina

    This is a practical guide for preparing the soil, running a CPT test, installing a scaled bucket foundation model and running a test in the large yellow sand box cos(Kristina) in the geotechnical laboratory at Aalborg University. The test procedure is used for the examination of statically...... and cyclically axially loaded bucket foundation model In dense sand. The foundation model in scale of approximately 1:10 compared to the prototype size. The guide describes the step-by-step procedure for tests with and without surface pressure. A detailed description of test setup using the large yellow sand box...... for a monopile testing was provided by Thomassen (2015a), procedure for monopile testing can be found in Thomassen (2015b), while safety instructions were given by Vaitkunaite et al. (2014)....

  2. Parametric Sensitivity Tests—European Polymer Electrolyte Membrane Fuel Cell Stack Test Procedures

    DEFF Research Database (Denmark)

    Araya, Samuel Simon; Andreasen, Søren Juhl; Kær, Søren Knudsen

    2014-01-01

    performed based on test procedures proposed by a European project, Stack-Test. The sensitivity of a Nafion-based low temperature PEMFC stack’s performance to parametric changes was the main objective of the tests. Four crucial parameters for fuel cell operation were chosen; relative humidity, temperature......As fuel cells are increasingly commercialized for various applications, harmonized and industry-relevant test procedures are necessary to benchmark tests and to ensure comparability of stack performance results from different parties. This paper reports the results of parametric sensitivity tests......, pressure, and stoichiometry at varying current density. Furthermore, procedures for polarization curve recording were also tested both in ascending and descending current directions....

  3. 77 FR 26607 - Energy Conservation Program: Test Procedures for Electric Motors and Small Electric Motors

    Science.gov (United States)

    2012-05-04

    ... Conservation Program: Test Procedures for Electric Motors and Small Electric Motors; Final Rules #0;#0;Federal... Procedures for Electric Motors and Small Electric Motors AGENCY: Office of Energy Efficiency and Renewable... electric motors and small electric motors. That supplemental proposal, along with an earlier proposal from...

  4. 46 CFR 159.007-3 - Production inspections and tests: Independent laboratory's procedures.

    Science.gov (United States)

    2010-10-01

    ...'s procedures. 159.007-3 Section 159.007-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND... meets the inspection and test procedures of the laboratory; and (3) Are accepted by the Commandant under...

  5. 10 CFR 431.444 - Test procedures for the measurement of energy efficiency.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for the measurement of energy efficiency. 431.444 Section 431.444 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR... procedures for the measurement of energy efficiency. (a) Scope. Pursuant to section 346(b)(1) of EPCA, this...

  6. 16 CFR 1610.33 - Test procedures for textile fabrics and film.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for textile fabrics and film... for textile fabrics and film. (a)(1) All textile fabrics (except those with a nitro-cellulose fiber... under the procedures outlined in part 1611, Standard for the Flammability of Vinyl Plastic Film, and if...

  7. 40 CFR 63.8687 - What performance tests, design evaluations, and other procedures must I use?

    Science.gov (United States)

    2010-07-01

    ... evaluations, and other procedures must I use? 63.8687 Section 63.8687 Protection of Environment ENVIRONMENTAL... What performance tests, design evaluations, and other procedures must I use? (a) You must conduct each... run must last at least 1 hour. (e) You must use the following equations to determine compliance with...

  8. 40 CFR 63.7112 - What performance tests, design evaluations, and other procedures must I use?

    Science.gov (United States)

    2010-07-01

    ... evaluations, and other procedures must I use? 63.7112 Section 63.7112 Protection of Environment ENVIRONMENTAL..., design evaluations, and other procedures must I use? (a) You must conduct each performance test in Table... use wet dust suppression to control PM from PSH operations, a visible mist is sometimes generated by...

  9. CENRTC Project number-sign 2F3EOA, OCB A-386, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00043/M (CENRTC 2F3EOA MWTT OCB A-386 PACKAGE). This procedure separates four tests into separate sections: Energization of A-386 Duplex Panel and Circuits; Local RFL 6750 function tests and start-up; SCADA tests; and A-386 local trip tests

  10. An investigation of the genetic toxicology of irradiated foodstuffs using short-term test systems

    International Nuclear Information System (INIS)

    Phillips, B.J.; Kranz, E.; Elias, P.S.

    1980-01-01

    As part of a programme of short-term tests used to detect possible genetic toxicity in irradiated foodstuffs, cultured Chinese hamster ovary cells were exposed to extracts and digests of irradiated and unirradiated dates, fish and chicken and subjected to tests for cytotoxicity, sister chromatid exchange induction and mutation to thioguanine resistance. The results showed no evidence of genetic toxicity induced in food by irradiation. The general applicability of cell culture tests to the detection of mutagens in food is discussed. (author)

  11. Characterization Test Procedures for Intersection Collision Avoidance Systems Based on Vehicle-to-Vehicle Communications

    Science.gov (United States)

    2015-12-01

    Characterization test procedures have been developed to quantify the performance of intersection collision avoidance (ICA) systems based on vehicle-to-vehicle communications. These systems warn the driver of an imminent crossing-path collision at a r...

  12. 49 CFR Appendix E to Part 240 - Recommended Procedures for Conducting Skill Performance Tests

    Science.gov (United States)

    2010-10-01

    ... tailor their testing procedures to the specific operational realities. This appendix contains FRA's..., headlight? —Couple to cars at a safe speed? —Properly control in train slack and buff forces? —Properly use...

  13. Vaspar broth-disk procedure for antibiotic susceptibility testing of anaerobic bacteria.

    OpenAIRE

    West, S E; Wilkins, T D

    1980-01-01

    A modification of the Wilkins-Thiel broth-disk procedure for antibiotic susceptibility testing of anaerobic bacteria is described. This method utilizes an aerobically prepared medium overlaid with molten vaspar. Specialized anaerobic techniques or prereduced media are not required.

  14. 75 FR 26183 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-05-11

    ... 2105-AE01 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of...: For program issues, Bohdan Baczara, Office of Drug and Alcohol Policy and Compliance, 1200 New Jersey... of Federal Regulations, as follows: [[Page 26184

  15. 77 FR 31443 - Energy Conservation Program: Test Procedures for Residential Dishwashers, Dehumidifiers, and...

    Science.gov (United States)

    2012-05-25

    ... an ion exchange to remove calcium and magnesium ions from the water, by swapping sodium ions bonded... addresses energy and water use associated with dishwasher water softeners, the energy test cycle for... dehumidifier test procedure, eliminate measurement of gas pilot light energy use in the cooking products test...

  16. 19 CFR 101.9 - Test programs or procedures; alternate requirements.

    Science.gov (United States)

    2010-04-01

    ... basis for selecting participants. (b) NCAP testing. For purposes of conducting an approved test program or procedure designed to evaluate planned components of the National Customs Automation Program (NCAP... publication requirement. For tests affecting the NCAP, notice shall be published in the Federal Register not...

  17. A Comparison of Procedures for Content-Sensitive Item Selection in Computerized Adaptive Tests.

    Science.gov (United States)

    Kingsbury, G. Gage; Zara, Anthony R.

    1991-01-01

    This simulation investigated two procedures that reduce differences between paper-and-pencil testing and computerized adaptive testing (CAT) by making CAT content sensitive. Results indicate that the price in terms of additional test items of using constrained CAT for content balancing is much smaller than that of using testlets. (SLD)

  18. Development of Start-up and Shutdown Procedure for the HANARO Fuel Test Loop

    International Nuclear Information System (INIS)

    Park, S. K.; Sim, B. S.; Chi, D. Y.; Lee, J. M.; Lee, C. Y.; Ahn, S. H.

    2009-06-01

    A start-up and shutdown procedure for the HANARO fuel test loop has been developed. This is a facility for fuel and material irradiation tests. The facility provides experimental conditions similar to the normal operational pressures and temperatures of commercial PWR and CANDU plants. The normal operation modes of the HANARO fuel test loop are classified into loop shutdown, cold stand-by 1, cold stand-by 2, hot stand-by, and hot operation. The operation modes depend on the fission power of test fuels and the coolant temperature at the inlet of the in-pile test section. The HANARO must maintain a shutdown mode if the HANARO fuel test loop is loop shutdown, cold stand-by 1, cold stand-by 2, or hot stand-by. As the HANARO becomes power operation mode, the operation mode of the HANARO fuel test loop comes to hot operation from hot stand-by. The procedure for the HANARO fuel test loop consists of four main parts such as check of initial conditions, stat-up operation procedure, shutdown operation procedure, and check lists for operations. Several hot test operations ensure that the procedure is appropriate

  19. Thermocouple module halt failure acceptance test procedure for Tank 241-SY-101 DACS-1

    International Nuclear Information System (INIS)

    Ermi, A.M.

    1997-01-01

    The readiness of the Tank 241-SY-101 Data Acquisition and Control System (DACS-1) to provide monitoring and alarms for a halt failure of any thermocouple module will be tested during the performance of this procedure. Updated DACS-1 ''1/0 MODULE HEALTH STATUS'', ''MININ1'', and ''MININ2'' screens, which now provide indication of thermocouple module failure, will also be tested as part of this procedure

  20. Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.

    Energy Technology Data Exchange (ETDEWEB)

    Barnette, Daniel Wayne

    2005-10-01

    This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

  1. Preanalytical errors in primary healthcare: a questionnaire study of information search procedures, test request management and test tube labelling.

    Science.gov (United States)

    Söderberg, Johan; Brulin, Christine; Grankvist, Kjell; Wallin, Olof

    2009-01-01

    Most errors in laboratory medicine occur in the preanalytical phase and are the result of human mistakes. This study investigated information search procedures, test request management and test tube labelling in primary healthcare compared to the same procedures amongst clinical laboratory staff. A questionnaire was completed by 317 venous blood sampling staff in 70 primary healthcare centres and in two clinical laboratories (response rate = 94%). Correct procedures were not always followed. Only 60% of the primary healthcare staff reported that they always sought information in the updated, online laboratory manual. Only 12% reported that they always labelled the test tubes prior to drawing blood samples. No major differences between primary healthcare centres and clinical laboratories were found, except for test tube labelling, whereby the laboratory staff reported better practices. Re-education and access to documented routines were not clearly associated with better practices. The preanalytical procedure in the surveyed primary healthcare centres was associated with a risk of errors which could affect patient safety. To improve patient safety in laboratory testing, all healthcare providers should survey their preanalytical procedures and improve the total testing process with a systems perspective.

  2. Design of test and emergency procedures to improve operator behaviour in French nuclear power plants

    International Nuclear Information System (INIS)

    Griffon-Fouco, M.; Gomolinski, M.

    1982-09-01

    The incident analyses performed in French nuclear power plants high-lighted that deficiencies in the design of procedures are frequent causes of human errors. The process for developing new guidelines for the writing of test and emergency procedures is presented: this process is based on operators interviews and observations at the plants or at simulators. The main principles for the writing of procedures are developed. For example: - the elaboration of a procedure for action and of a separate educational procedure, - the coordination of crew responses, - the choice of vocabulary, graphs, flow charts and so on as regards the format. Other complementary actions, such as the training of operators in the use of procedures, are described

  3. Design of test and emergency procedures to improve operator behavior in French nuclear power plants

    International Nuclear Information System (INIS)

    Griffon-Fouco, M.; Gomolinski, M.

    1983-01-01

    The incident analyses performed in French nuclear power plants high-lighted that deficiencies in the design of procedures are frequent causes of human errors. The process for developing new guidelines for the writing of test and emergency procedures is presented: this process is based on operators interviews and observations at the plants or at simulators. The main principles for the writing of procedures are developed. For example: the elaboration of a procedure for action and of separate educational procedure; the coordination of crew responses; and the choice of vocabulary, graphs, flow charts and so on as regards the format. Other complementary actions, such as the training of operators in the use of procedures, are described

  4. EFAM GTP 02 - the GKSS test procedure for determining the fracture behaviour of materials

    International Nuclear Information System (INIS)

    Schwalbe, K.H.; Heerens, J.; Zerbst, U.; Kocak, M.

    2002-01-01

    This document describes a unified fracture mechanics test method in procedural form for quasi-static testing of materials. It is based on the ESIS Procedures P1 and P2 and introduces additional features, such as middle cracked tension specimens, shallow cracks, the δ 5 crack tip opening displacement, the crack tip opening angle, the rate of dissipated energy, testing of weldments, and guidance for statistical treatment of scatter. Special validity criteria are given for tests on specimens with low constraint. This document represents an updated version of EFAM GTP 94. (orig.) [de

  5. Microwave Ablation of Lung Tumors Near the Heart: A Retrospective Review of Short-Term Procedural Safety in Ten Patients.

    Science.gov (United States)

    Maxwell, Aaron W P; Healey, Terrance T; Dupuy, Damian E

    2017-09-01

    To evaluate the rate of short-term complications associated with microwave ablation of lung tumors located near the heart. This HIPAA-compliant study was performed with a waiver for informed consent. Patients who underwent microwave ablation of lung tumors located 10 mm or less from the heart were identified by retrospective chart review. Both primary and metastatic tumors were included. Only tumors directly adjacent to one of the four cardiac chambers were included. All patients were treated in a single session using CT guidance with continuous electrocardiographic monitoring. Rates of new-onset arrhythmia and myocardial infarction (MI) within 90 days of the procedure were quantified, and evidence of cardiac or pericardiac injury was assessed for using post-ablation contrast-enhanced chest CT, electrocardiography (EKG), and-when available-echocardiography. Complications were graded using the Common Terminology Criteria for Adverse Events (CTCAE) system. Ten patients (four males, six females; mean age 73.1 ± 9.5 years) met all inclusion criteria. Mean tumor distance from the heart was 3 mm (range, 0-6 mm). New-onset arrhythmia was not observed during or following any of the microwave ablation treatments, and there were no documented 90-day MI events. CTCAE Grade 1 complications were observed by CT in eight patients, most commonly mild focal pericardial thickening. EKG and echocardiography were normal in all patients. No major complications (CTCAE Grade 3 or greater) were observed. Microwave ablation of lung tumors located 10 mm or less from the heart appears to have low associated short-term morbidity and may be appropriate in selected patients.

  6. Device for testing continuity and/or short circuits in a cable

    Science.gov (United States)

    Hayhurst, Arthur R. (Inventor)

    1995-01-01

    A device for testing current paths is attachable to a conductor. The device automatically checks the current paths of the conductor for continuity of a center conductor, continuity of a shield and a short circuit between the shield and the center conductor. The device includes a pair of connectors and a circuit to provide for testing of the conductive paths of the cable. The pair of connectors electrically connects the conductive paths of a cable to be tested with the circuit paths of the circuit. The circuit paths in the circuit include indicators to simultaneously indicate the results of the testing.

  7. Reliability of the Test of Wheeled Mobility (TOWM) and the Short Wheelie Test

    NARCIS (Netherlands)

    Fliess-Douer, Osnat; Van der Woude, Lucas H. V.; Vanlandewijck, Yves C.

    Objective: To assess the reliability of the Test of Wheeled Mobility (TOWM) and the Wheelie test. Design: Cohort study. Setting: Gymnasium. Participants: Manual wheelchair users (N=30, age 23-53y) with a spinal cord injury. Intervention: Participants performed the 30 skills of the TOWM and the 8

  8. An Iterative Procedure for Efficient Testing of B2B: A Case in Messaging Service Tests

    Energy Technology Data Exchange (ETDEWEB)

    Kulvatunyou, Boonserm [ORNL

    2007-03-01

    Testing is a necessary step in systems integration. Testing in the context of inter-enterprise, business-to-business (B2B) integration is more difficult and expensive than intra-enterprise integration. Traditionally, the difficulty is alleviated by conducting the testing in two stages: conformance testing and then interoperability testing. In conformance testing, systems are tested independently against a reference system. In interoperability testing, they are tested simultaneously against one another. In the traditional approach for testing, these two stages are performed sequentially with little feedback between them. In addition, test results and test traces are left only to human analysis or even discarded if the solution passes the test. This paper proposes an approach where test results and traces from both the conformance and interoperability tests are analyzed for potential interoperability issues; conformance test cases are then derived from the analysis. The result is that more interoperability issues can be resolved in the lower-cost conformance testing mode; consequently, time and cost required for achieving interoparble solutions are reduced.

  9. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU II card for Leak Detector Use Acceptance Test Procedure

    International Nuclear Information System (INIS)

    SMITH, S.G.

    1999-01-01

    The following Acceptance Test Procedure was written to test the ENRAF series 854 ATG with SPU II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and alarms functionality

  10. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU ll Card for Leak Detector Use Acceptance Test Procedure

    International Nuclear Information System (INIS)

    SMITH, S.G.

    1999-01-01

    The following Acceptance Test Procedure was written to test the Enraf Series 854 ATG with SPU-II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and the alarms functionality

  11. Initial land reclamation procedures related to possible Pu-cleanup activities at the Tonopah Test Range

    International Nuclear Information System (INIS)

    Wallace, A.; Romney, E.M.

    1976-02-01

    If areas of the Tonopah Test Range (TTR) are to be used for experimental tests of procedures for clean-up of 239 Pu contamination, there are experiences in the Great Basin Desert portions of the Nevada Test Site (NTS) which can serve as guides to reclamation and revegetation of such arid lands. Procedures which will encourage development of the grasses Hilaria jamesii and Oryzopsis hymenoides, as well as the perennial shrubs Eurotia lanata and Atriplex canescens would greatly improve the area as range land

  12. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid

  13. 75 FR 14287 - Energy Conservation Program: Test Procedures for Fluorescent Lamp Ballasts

    Science.gov (United States)

    2010-03-24

    ... uses the same measurement techniques as the existing test procedure. In any rulemaking to amend a test...; and (3) appearing on page 29 of the transcript. \\6\\ Ballast type refers to a grouping of ballasts that... grouping of lamps that have the same length, lumen package, base type, and diameter. In the ongoing...

  14. 77 FR 8178 - Test Procedures for Central Air Conditioners and Heat Pumps: Public Meeting

    Science.gov (United States)

    2012-02-14

    .... EERE-2010-BT-TP-0038] Test Procedures for Central Air Conditioners and Heat Pumps: Public Meeting... methodologies and gather comments on testing residential central air conditioners and heat pumps designed to use... residential central air conditioners and heat pumps that are single phase with rated cooling capacities less...

  15. Communication with patients during the prenatal testing procedure: an explorative qualitative study

    NARCIS (Netherlands)

    van Zwieten, Myra; Willems, Dick; Knegt, Lia; Leschot, Nico

    2006-01-01

    OBJECTIVE: While generally two phases of prenatal genetic counseling are distinguished, i.e. pre- and post-test counseling, we revealed a third form of communication during the testing procedure. The content of this intermediate communication was explored. METHODS: A secondary analysis was performed

  16. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid

  17. 75 FR 8526 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-25

    ... 2105-AD64 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of... required method. However, in response to comments requesting additional flexibility in testing methods, the... may increase flexibility and lower costs for employers who choose to use them over more expensive...

  18. 49 CFR 572.75 - Lumbar spine, abdomen, and pelvis assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ...) ANTHROPOMORPHIC TEST DEVICES 6-Year-Old Child § 572.75 Lumbar spine, abdomen, and pelvis assembly and test procedure. (a) Lumbar spine, abdomen, and pelvis assembly. The lumbar spine, abdomen, and pelvis consist of... 49 Transportation 7 2010-10-01 2010-10-01 false Lumbar spine, abdomen, and pelvis assembly and...

  19. Enraf series 854 Advanced Technology Gauge (ATG) acceptance test procedure. Revision 3

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1995-01-01

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area

  20. 75 FR 5722 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-04

    ... personal identifying information about an employee (other than a social security number (SSN) or other... testing required under this part. (c) As a drug testing laboratory located in Canada or Mexico which is... procedures. (d) As an IITF located in Canada or Mexico which is not certified by HHS under the NLCP, you are...

  1. 76 FR 69869 - Energy Conservation Program: Test Procedures for Residential Clothes Washers

    Science.gov (United States)

    2011-11-09

    ... ensure that the test procedure is representative of consumer behavior and repeatable among different test... would not be factored into its energy efficiency rating. This would imply that consumer behavior would... previous section, DOE does not have data to verify how consumers may adjust their behavior based on the...

  2. 76 FR 65616 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Central Air...

    Science.gov (United States)

    2011-10-24

    ... pages 2- 3. Both the American Heating and Refrigeration Institute (AHRI) and Trane stated that the... untested split system combinations for SEER and HSPF. \\4\\ ARMs are computer simulations used to rate... procedure, which is detailed in section 0, and comprises whole system testing, not testing or simulation of...

  3. Standard testing procedures for optical fiber and unshielded twisted pair at Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Adams, R.L.

    1993-11-01

    This document will establish a working standard for testing optical fiber and unshielded twisted pair cables included in the Lab-wide telecommunications cabling system. The purpose of these standard testing procedures is to deliver to all Sandians a reliable, low-maintenance, state-of-the-art, ubiquitous telecommunications cabling infrastructure capable of satisfying all current and future telecommunication needs.

  4. Test Operation Procedure (TOP) 01-1-010A Vehicle Test Course Severity (Surface Roughness)

    Science.gov (United States)

    2017-12-12

    Increases in roughness may signify the need to change course maintenance patterns. For example, secondary gravel roads at YTC go through a cycle of...CSTE-DTC-AT-AD) U.S. Army Aberdeen Test Center 400 Colleran Road Aberdeen Proving Ground, MD 21005-5059 8. PERFORMING ORGANIZATION REPORT...test courses at ATEC Test Centers. 15. SUBJECT TERMS Automotive test course Roughness of roads Wave number spectrum Test course surface roughness

  5. Effect of Sucrose Analgesia, for Repeated Painful Procedures, on Short-term Neurobehavioral Outcome of Preterm Neonates: A Randomized Controlled Trial.

    Science.gov (United States)

    Banga, Shreshtha; Datta, Vikram; Rehan, Harmeet Singh; Bhakhri, Bhanu Kiran

    2016-04-01

    Safety of oral sucrose, commonly used procedural analgesic in neonates, is questioned. To evaluate the effect of sucrose analgesia, for repeated painful procedures, on short-term neurobehavioral outcome of preterm neonates. Stable preterm neonates were randomized to receive either sucrose or distilled water orally, for every potentially painful procedure during the first 7 days after enrollment. Neurodevelopmental status at 40 weeks postconceptional age (PCA) measured using the domains of Neurobehavioral Assessment of Preterm Infants scale. A total of 93 newborns were analyzed. The baseline characteristics of the groups were comparable. No statistically significant difference was observed in the assessment at 40 weeks PCA, among the groups. Use of sucrose analgesia, for repeated painful procedures on newborns, does not lead to any significant difference in the short-term neurobehavioral outcome. © The Author [2015]. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  6. Test procedures and instructions for single shell tank saltcake cesium removal with crystalline silicotitanate

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, J.B.

    1997-01-07

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test, using Hanford Single Shell Tank Saltcake from tanks 24 t -BY- I 10, 24 1 -U- 108, 24 1 -U- 109, 24 1 -A- I 0 1, and 24 t - S-102, in a bench-scale column. The cesium sorbent to be tested is crystalline siticotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-024, Hanford Single Shell Tank Saltcake Cesium Removal Test Plan.

  7. Development of interim test methods and procedures for determining the performance of small photovoltaic systems

    Energy Technology Data Exchange (ETDEWEB)

    McNutt, P.; Kroposki, B.; Hansen, R.; Algra, K.; DeBlasio, R. [National Renewable Energy Lab., Golden, CO (United States)

    1998-09-01

    The National Renewable Energy Laboratory (NREL) is developing tests and procedures that will determine if the configuration of a small photovoltaic (PV) system is suitable for its intended use, and if the system will perform as specified. An overview of these procedures is presented in this paper. Development of standard test procedures will allow designers, manufacturers, system integrators, users, and independent laboratories to assess the performance of PV systems under outdoor prevailing conditions. An NREL Technical Report detailing the procedures is under way, and the IEEE Standards Coordinating Committee 21 (SCC21) has established a project on this subject. The work will be submitted to the IEEE SCC21 and International Electrotechnical Commission Technical Committee 82 (IEC TC82) for consideration as a consensus standard. Certification bodies such as PowerMark and PV Global Approval Program (PVGAP) may adopt the IEC and IEEE documents when testing systems. Developing standardized test methods and procedures at NREL to evaluate the outdoor performance of PV systems will encourage product quality and promote PV standards development. Standardized tests will assure people that PV systems will perform as specified for their intended applications. As confidence in PV systems increases, the successful commercialization of PV will grow internationally.

  8. Recommended procedures for performance testing of radiobioassay laboratories: Volume 2, In vitro samples

    International Nuclear Information System (INIS)

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed for the US Department of Energy and the US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The bioassay testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped develop testing procedures as part of an effort to evaluate the performance criteria by testing the existing measurement capabilities of various bioassay laboratories. This report recommends guidelines for the preparation, handling, storage, distribution, shipping, and documentation of in vitro test samples (artificial urine and fecal matter) for indirect bioassay. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 8 refs., 3 tabs

  9. Test Operations Procedure (TOP) 01-1-025 Camouflage Performance Testing Using Observers

    Science.gov (United States)

    2016-05-05

    one observer approaching the test article at a time, but these tests are time consuming and expensive to execute for collection of statistically...best data collection approach is live in the field using only one observer for each trial run but these tests are extremely time consuming and...with viewing angle, relative to the ground plane of the observation should be considered in the test design. The impact of aspect angle, such as

  10. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid ''P''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix

  11. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix

  12. Laparoscopic Stephen-Fowler stage procedure: appropriate management for high intra-abdominal testes.

    Science.gov (United States)

    Agrawal, Amit; Joshi, Milind; Mishra, Pankaj; Gupta, Rahul; Sanghvi, Beejal; Parelkar, Sandesh

    2010-03-01

    The length of testicular vessels is the main length-limiting factor to bring down the testes in the scrotum. Fowler and Stephen proposed the division of testicular vessels, high and as far from the testes as possible to maintain collateral blood supply, to treat high intra-abdominal testes. Cortesi introduced the diagnostic laparoscopy and Jorden first did the laparoscopic orchiopexy for nonpalpable testes. We had done Fowler-Stephen staged orchiopexy for high intra-abdominal testes, in which both stages were done laparoscopically. In total, 17 testes of 13 patients had undergone laparoscopic staged Fowler-Stephen orchiopexy. The decision to perform a staged Fowler-Stephen orchiopexy was based on the distance of the testis from the deep inguinal ring on laparoscopy. If distance was more than 2.5 cm, then we proceeded to a laparoscopic staged Fowler-Stephen orchiopexy. In the first stage, testicular vessels were cauterized by bipolar diathermy. Laparoscopic second-stage Fowler-Stephen procedure was done 6 months after the first stage. Patients were regularly followed, and the success of the procedure was assessed by the size of the testes and the position in the scrotum. Testicular vascularity was assessed by color Doppler ultrasonography. There was no testicular atrophy on second stage and on follow-up. All testes were in the scrotum with good size on follow-up. There was no complication related to laparoscopy. In cases of high intra-abdominal testes, the staged Fowler-Stephen procedure should be the procedure of choice. This procedure yields a high success rate. Transaction of vessels by bipolar diathermy is a very safe, cost-effective method.

  13. A Bayesian decision procedure for testing multiple hypotheses in DNA microarray experiments.

    Science.gov (United States)

    Gómez-Villegas, Miguel A; Salazar, Isabel; Sanz, Luis

    2014-02-01

    DNA microarray experiments require the use of multiple hypothesis testing procedures because thousands of hypotheses are simultaneously tested. We deal with this problem from a Bayesian decision theory perspective. We propose a decision criterion based on an estimation of the number of false null hypotheses (FNH), taking as an error measure the proportion of the posterior expected number of false positives with respect to the estimated number of true null hypotheses. The methodology is applied to a Gaussian model when testing bilateral hypotheses. The procedure is illustrated with both simulated and real data examples and the results are compared to those obtained by the Bayes rule when an additive loss function is considered for each joint action and the generalized loss 0-1 function for each individual action. Our procedure significantly reduced the percentage of false negatives whereas the percentage of false positives remains at an acceptable level.

  14. Hanford spent nuclear fuel cold vacuum drying proof of performance test procedure

    International Nuclear Information System (INIS)

    McCracken, K.J.

    1998-01-01

    This document provides the test procedure for cold testing of the first article skids for the Cold Vacuum Drying (CVD) process at the Facility. The primary objective of this testing is to confirm design choices and provide data for the initial start-up parameters for the process. The current scope of testing in this document includes design verification, drying cycle determination equipment performance testing of the CVD process and MCC components, heat up and cool-down cycle determination, and thermal model validation

  15. Acceptance test procedure for a portable, self-contained nitrogen supply

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0249 Rev. 1 and ECN 606112. The equipment being tested is a Portable, Self-Contained Nitrogen Supply. The unit was purchased as a Design and Fabrication procurement activity. The Functional Test was written by the Seller and is contained in Appendix A. The Functional test will be performed by the Seller with representatives of the Westinghouse Hanford Company performing inspection and witnessing the functional test at the Seller's location

  16. Test Operations Procedure (TOP) 05-2-543 Enhanced Flight Termination Receiver (EFTR) Range Certification Testing

    Science.gov (United States)

    2011-07-25

    35 5.10 Signal Strength Telemetry Output ( SSTO ) (Test Number 10) ............ 38 5.11 Operational...All command outputs and monitor outputs shall respond properly. TOP 05-2-543 25 July 2011 38 5.10 Signal Strength Telemetry Output ( SSTO ...Test Number 10). a. Purpose. This test verifies that the signal strength telemetry output ( SSTO ) voltage is monotonic and directly related to the

  17. Test procedure for anion exchange testing with Argonne 10-L solutions

    International Nuclear Information System (INIS)

    Compton, J.A.

    1995-01-01

    Four anion exchange resins will be tested to confirm that they will sorb and release plutonium from/to the appropriate solutions in the presence of other cations. Certain cations need to be removed from the test solutions to minimize adverse behavior in other processing equipment. The ion exchange resins will be tested using old laboratory solutions from Argonne National Laboratory; results will be compared to results from other similar processes for application to all plutonium solutions stored in the Plutonium Finishing Plant

  18. Test procedures to detect a loss of material in a sequence of balance periods

    International Nuclear Information System (INIS)

    Avenhaus, R.; Beedgen, R.; Sellinschegg, D.

    1985-06-01

    A workshop on Near-Real-Time Accountancy (NRTA) was held in KfK which came to a preliminary end in December 1982. In the framework of this workshop a number of sequential statistical test procedures were proposed which can be used in the case of a NRTA based safeguards regime. In the report the most promising test procedures are investigated. The analysis is based on the chemical separation process of a large model reprocessing facility with a throughput or 1000 tonnes per year. (orig.) [de

  19. Clean fog rapid procedure test of artificially and naturally polluted HVDC porcelain barrel insulators

    International Nuclear Information System (INIS)

    Vlastos, A.E.

    1992-01-01

    The first question asked in this paper refers to the variation of the peak leakage current prior to the flashover and the variation of the time prior to flashover in the test of artificially polluted insulators when using the up-and-down method. To answer this question sums up the test procedure used in the up-and-down method. For each trial represented the insulator was again polluted artificially and then dried following the procedure described in the paper. Then the insulator was transported into the fog chamber and the voltage and fog was switched on simultaneously. In these experiments a low fog injection rate was used

  20. A test procedure for energetic and performance analysis of cold appliances for the food industry

    International Nuclear Information System (INIS)

    Armani, F; Boscolo, A

    2013-01-01

    In this article we present a novel approach for the characterization of cold appliances and in particular of refrigerators based on the standard vapour compression cycle with a reciprocating on/off compressor. The test procedure is based on a virtual instrument that perform both the stimulus and the data acquisition on the device under test. Acquired data is elaborated to fit a semi-empirical model based on the energetic balances between thermal and electrical sub systems and the heat exchanged with the environment. This approach results in a simple method to calculate useful parameters of the refrigerator, such as energetic performance, cooling effect and limit values of thermal loads. The test procedure requires only a few temperatures and the electric power consumption to be monitored, resulting in a low impact on the refrigerator. Preliminary tests showed a good estimation of parameters and prediction of energy consumption and heat extraction capacity of the refrigerator under test

  1. X-ray testing for short-time dynamic applications; Roentgenuntersuchungen fuer kurzzeitdynamische Anwendungen

    Energy Technology Data Exchange (ETDEWEB)

    Kurfiss, Malte; Moser, Stefan; Popko, Gregor; Nau, Siegfried [Fraunhofer-Institut fuer Kurzzeitdynamik, Efringen-Kirchen (Germany). Ernst-Mach-Inst. (EMI)

    2017-08-01

    For nondestructive testing purposes new challenges are short-time dynamic processes. The application of x-ray flash tubes and modern high-speed cameras allows the observation of the opening of air-bags or the energy absorption of compressed tubes as occurring during a vehicle crash. Special algorithms designed for computerized tomography analyses allow the 3D reconstruction at individual time points of the dynamic process. Possibilities and limitations of the actual techniques are discussed.

  2. Mercury Induced Biochemical Alterations As Oxidative Stress In Mugil Cephalus In Short Term Toxicity Test

    OpenAIRE

    J.S.I Rajkumar; Samuel Tennyson

    2013-01-01

    Mugil cephalus juveniles of size 2.5 ±0.6cm were exposed to mercury in short term chronic toxicity test through static renewal bioassay to detect the possible biochemical agent as biomarkers in aquatic pollution and in estuarine contamination as specific. Lipid peroxidation levels, glutathione S -transferase, catalase, reduced glutathione and acetylcholinesterase were studied as biochemical parameters. Increased thio-barbituric acid reactive substances levels were observed under exposur...

  3. Fundamental tests and measures of the structure of matter at short distances

    International Nuclear Information System (INIS)

    Brodsky, S.J.

    1981-07-01

    Recent progress in gauge field theories has led to a new perspective on the structure of matter and basic interactions at short distances. It is clear that at very high energies quantum electrodynamics, together with the weak and strong interactions, are part of a unified theory with new fundamental constants, new symmetries, and new conservation laws. A non-technical introduction to these topics is given, with emphasis on fundamental tests and measurements. 21 references

  4. Reliability testing of the Danish version of the Kidney Disease Quality of Life Short Form

    DEFF Research Database (Denmark)

    Molsted, Stig; Heaf, James; Prescott, Lotte

    2005-01-01

    . MATERIAL AND METHODS: Translation into Danish and back-translation into English were performed. Pilot, field and internal consistency reliability tests were performed. RESULTS: Cronbach's alpha coefficients for the internal reliability test ranged from 0.77 to 0.93 for the eight generic scales. In a test......OBJECTIVE: The questionnaire Kidney Disease Quality of Life Short Form version 1.3 (KDQOL-SF) is valuable for assessing the health-related quality of life in patients treated with chronic dialysis. The aim of this study was to translate and test the reliability of the KDQOL-SF for use in Denmark...... involving all patients, two of the disease-specific scales had Cronbach's alpha coefficients of test of the scores...

  5. Efficient Noninferiority Testing Procedures for Simultaneously Assessing Sensitivity and Specificity of Two Diagnostic Tests

    Directory of Open Access Journals (Sweden)

    Guogen Shan

    2015-01-01

    Full Text Available Sensitivity and specificity are often used to assess the performance of a diagnostic test with binary outcomes. Wald-type test statistics have been proposed for testing sensitivity and specificity individually. In the presence of a gold standard, simultaneous comparison between two diagnostic tests for noninferiority of sensitivity and specificity based on an asymptotic approach has been studied by Chen et al. (2003. However, the asymptotic approach may suffer from unsatisfactory type I error control as observed from many studies, especially in small to medium sample settings. In this paper, we compare three unconditional approaches for simultaneously testing sensitivity and specificity. They are approaches based on estimation, maximization, and a combination of estimation and maximization. Although the estimation approach does not guarantee type I error, it has satisfactory performance with regard to type I error control. The other two unconditional approaches are exact. The approach based on estimation and maximization is generally more powerful than the approach based on maximization.

  6. 40 CFR 86.163-00 - Spot check correlation procedures for vehicles tested using a simulation of the environmental...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Spot check correlation procedures for... Complete Heavy-Duty Vehicles; Test Procedures § 86.163-00 Spot check correlation procedures for vehicles... running change approval, each model year for any manufacturer undergoing the spot checking procedures of...

  7. 9 CFR 147.30 - Laboratory procedure recommended for the polymerase chain reaction (PCR) test for Mycoplasma...

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Laboratory procedure recommended for... Examination Procedures § 147.30 Laboratory procedure recommended for the polymerase chain reaction (PCR) test... tracheal swabs in PBS or 1 mL of broth culture by a non-phenolic procedure. Centrifuge samples at 14,000 x...

  8. Procedure to select test organisms for environmental risk assessment of genetically modified crops in aquatic systems.

    Science.gov (United States)

    Hilbeck, Angelika; Bundschuh, Rebecca; Bundschuh, Mirco; Hofmann, Frieder; Oehen, Bernadette; Otto, Mathias; Schulz, Ralf; Trtikova, Miluse

    2017-11-01

    For a long time, the environmental risk assessment (ERA) of genetically modified (GM) crops focused mainly on terrestrial ecosystems. This changed when it was scientifically established that aquatic ecosystems are exposed to GM crop residues that may negatively affect aquatic species. To assist the risk assessment process, we present a tool to identify ecologically relevant species usable in tiered testing prior to authorization or for biological monitoring in the field. The tool is derived from a selection procedure for terrestrial ecosystems with substantial but necessary changes to adequately consider the differences in the type of ecosystems. By using available information from the Water Framework Directive (2000/60/EC), the procedure can draw upon existing biological data on aquatic systems. The proposed procedure for aquatic ecosystems was tested for the first time during an expert workshop in 2013, using the cultivation of Bacillus thuringiensis (Bt) maize as the GM crop and 1 stream type as the receiving environment in the model system. During this workshop, species executing important ecological functions in aquatic environments were identified in a stepwise procedure according to predefined ecological criteria. By doing so, we demonstrated that the procedure is practicable with regard to its goal: From the initial long list of 141 potentially exposed aquatic species, 7 species and 1 genus were identified as the most suitable candidates for nontarget testing programs. Integr Environ Assess Manag 2017;13:974-979. © 2017 SETAC. © 2017 SETAC.

  9. Procedure for vibration test of the fuel rod supported by spacer grids

    International Nuclear Information System (INIS)

    Choi, Myoung Hwan; Kang, Heung Seok; Yoon, Kyung Ho; Kim, Hyung Kyu; Song, Kee Nam

    2002-07-01

    One of the methods that are used to compare and verify the supporting performance of the spacer grids developed is the vibration characteristic test. In this report there are two aims. One is of the understand of the experimental method and procedure performing the modal testing using I-DEAS TDAS module. The other is the investigation of the vibration behaviors of a dummy fuel rod supported by 8 optimized H type spacer grids. This report describes the method and procedure of modal testing to obtain the vibration characteristics such as amplitudes, natural frequencies and mode shapes of the fuel rod using a shaker, a non-contact gap sensor and an accelerometer. This report provides a test procedure in detail so that anyone can be easily understood and use the I-DEAS TDAS program. The I-DEAS TDAS program related to the modal testing has several tasks including the Modal analysis, Signal Processing et al.. This report includes model preparation to prepare the geometrical model, Signal Processing (Sine/Standard measurement) to acquire the signal, Modal analysis to obtain the frequencies and mode shapes, Correlation to analyze the relation between the test and FE analysis and Post Processing tasks. In addition, this report contains the actual test and analysis data of a dummy fuel rod in length 3847mm supported by 8 optimized H type spacer grids

  10. Benign tracheobronchial stenoses: changes in short-term and long-term pulmonary function testing after expandable metallic stent placement.

    Science.gov (United States)

    Gotway, Michael B; Golden, Jeffrey A; LaBerge, Jeanne M; Webb, W Richard; Reddy, Gautham P; Wilson, Mark W; Kerlan, Robert K; Gordon, Roy L

    2002-01-01

    To determine the short- and long-term improvement in airflow dynamics in patients undergoing tracheobronchial stent placement for benign airway stenoses. Twenty-two patients underwent 34 tracheal and/or bronchial stent placement procedures for benign airway stenoses and had the results of pulmonary function tests available. Stent placement indications included bronchomalacia after lung transplantation (n = 11), postintubation stenoses (n = 6), relapsing polychondritis (n = 2), and 1 each of tracheomalacia, tracheal compression, and histoplasmosis. Six patients underwent more than one stent placement procedure (range: 2-7 procedures). The mean forced expiratory volume in one second (FEV(1) ), forced expiratory flow rate in the midportion of the forced vital capacity curve (FEF(25-75) ), forced vital capacity, and peak flow (PF) rate obtained before stent placement were compared with those immediately after stent placement and with those measurements most remote from stent placement using the paired two-tailed test. All patients reported improved respiratory function immediately after stent placement. The mean FEV(1), FEF(25-75), and PF rate improved significantly (p stent placement. On long-term follow-up averaging 15 months after stent placement, these parameters declined despite patients' subjective sense of improvement. Segregating the population into transplant and nontransplant airway stenosis etiologies, however, FEF(25-75) and PF rate remained significantly improved (p = 0.045, p = 0.027, respectively), over the long term for the latter. FEV increased after subsequent stent placements for patients receiving multiple stents. Stent placement for benign tracheobronchial stenoses provides significant immediate improvement in airflow dynamics. Long-term improvement in airflow obstruction may be expected, and additional stent placements may further improve pulmonary function.

  11. Short-term clinical and quality-of-life outcomes in women treated by the TVT-Secur procedure.

    Science.gov (United States)

    Lim, Jeanette L; de Cuyper, Eva M J; Cornish, Ann; Frazer, Malcolm

    2010-04-01

    The TVT-Secur (Ethicon, Somerville, NJ, USA) is a minimally invasive suburethral synthetic sling used in the treatment of female stress urinary incontinence. It claims to cause less postoperative pain and to enable performing in an office setting. However, this may be at the expense of a significant learning curve and a higher early failure rate. To assess objectively the success rate of the TVT-Secur procedure in the 'U' configuration at six months. Secondary outcomes focussed on subjective success rates, complications, patient satisfaction and quality-of-life (QOL). A prospective observational study was undertaken at two tertiary referral urogynaecology centres. A cohort of 42 consecutive patients with urodynamic stress incontinence who underwent the TVT-Secur procedure in the 'U' configuration between November 2006 and August 2007 were followed up for six months. Three standardised QOL questionnaires were completed preoperatively and at six months. A urogenital history, visual analogue score (VAS) for patient satisfaction, uroflow and urinary stress test were performed at six months. Recruitment was ceased prematurely because of a high number of early failures. Objective and subjective success rates at six months were 58.3% and 51.3% respectively. Complications included urinary tract infections, voiding difficulty, groin discomfort, haematoma, vaginal pain, tape erosion and intra-operative dislodgement of tape. Prevalence of de novo urge incontinence was 10.3%. Only symptom-specific QOL scores improved and only 48.6% indicated a high level satisfaction (VAS > or = 80%) with TVT-Secur. On the basis of this limited study, we are hesitant to recommend the 'U' configuration of the TVT-Secur over its more established counterparts, the TVT and TVT-O.

  12. Acceptance test procedure for K basins dose reduction project clean and coat equipment

    International Nuclear Information System (INIS)

    Creed, R.F.

    1996-01-01

    This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment's ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020

  13. In situ impulse test: an experimental and analytical evaluation of data interpretation procedures

    International Nuclear Information System (INIS)

    1975-08-01

    Special experimental field testing and analytical studies were undertaken at Fort Lawton in Seattle, Washington, to study ''close-in'' wave propagation and evaluate data interpretation procedures for a new in situ impulse test. This test was developed to determine the shear wave velocity and dynamic modulus of soils underlying potential nuclear power plant sites. The test is different from conventional geophysical testing in that the velocity variation with strain is determined for each test. In general, strains between 10 -1 and 10 -3 percent are achieved. The experimental field work consisted of performing special tests in a large test sand fill to obtain detailed ''close-in'' data. Six recording transducers were placed at various points on the energy source, while approximately 37 different transducers were installed within the soil fill, all within 7 feet of the energy source. Velocity measurements were then taken simultaneously under controlled test conditions to study shear wave propagation phenomenology and help evaluate data interpretation procedures. Typical test data are presented along with detailed descriptions of the results

  14. 75 FR 13009 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-03-18

    ... DEPARTMENT OF TRANSPORTATION Office of the Secretary 49 CFR Part 40 [Docket DOT-OST-2008-0088] RIN OST 2105-AD84 Procedures for Transportation Workplace Drug and Alcohol Testing Programs Correction In rule document 2010-3731 beginning on page 8528 in the issue of Thursday, February 25, 2010, make the...

  15. 75 FR 22213 - Energy Conservation Program: Test Procedures for General Service Fluorescent Lamps, Incandescent...

    Science.gov (United States)

    2010-04-28

    ..., Department of Energy. ACTION: Final rule; technical amendments. SUMMARY: This document contains a technical... test procedure regulations for the above-specified lamps. However, due to a drafting error, part of the.... Since the publication of that rule, it has come to DOE's attention that, due to a technical oversight, a...

  16. Comparison of IRT Likelihood Ratio Test and Logistic Regression DIF Detection Procedures

    Science.gov (United States)

    Atar, Burcu; Kamata, Akihito

    2011-01-01

    The Type I error rates and the power of IRT likelihood ratio test and cumulative logit ordinal logistic regression procedures in detecting differential item functioning (DIF) for polytomously scored items were investigated in this Monte Carlo simulation study. For this purpose, 54 simulation conditions (combinations of 3 sample sizes, 2 sample…

  17. Comparing Treatment and Control Groups on Multiple Outcomes: Robust Procedures for Testing a Directional Alternative Hypothesis

    Science.gov (United States)

    Lix, Lisa M.; Deering, Kathleen N.; Fouladi, Rachel T.; Manivong, Phongsack

    2009-01-01

    This study considers the problem of testing the difference between treatment and control groups on m [greater than or equal to] 2 measures when it is assumed a priori that the treatment group will perform better than the control group on all measures. Two procedures are investigated that do not rest on the assumptions of covariance homogeneity or…

  18. 75 FR 37593 - Energy Conservation Program for Consumer Products: Test Procedures for Clothes Dryers and Room...

    Science.gov (United States)

    2010-06-29

    ... docket number EERE-2008-BT-TP-0010 and/or RIN 1904-AC02 in the subject line of the message. 3. Mail: Ms... DOE clothes washer test procedure), which is assumed to proportionally impact dryer load sizes. DOE... noted that IEC Standard 62087 specifies methods of measuring the power consumption of TV receivers...

  19. Testing taste sensitivity and aversion in very young children : development of a procedure

    NARCIS (Netherlands)

    Visser, J; Kroeze, J.H.A.; Kamps, WA; Bijleveld, CMA

    Taste perception in 45 3- to 6-year-old children was tested using procedures specifically designed for this age group. Detection thresholds for sucrose and urea were measured by a staircase method and aversion to urea was assessed hedonically, using drawings of facial expressions. All children

  20. 75 FR 52892 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters...

    Science.gov (United States)

    2010-08-30

    ... ``Energy Conservation Program for Consumer Products Other Than Automobiles,'' including residential water... final rule revising energy conservation standards for residential water heaters, direct heating.... EERE-2009-BT-TP-0013] RIN 1904-AB95 Energy Conservation Program for Consumer Products: Test Procedures...

  1. 75 FR 8524 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-25

    ... 2105-AD67 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of... IFR to mitigate this conflict between the DOT rules and what we view as beneficial State laws by.... It merely eliminated a conflict that would have precluded parties from complying with certain State...

  2. 77 FR 13887 - Energy Conservation Program: Test Procedures for Residential Clothes Washers

    Science.gov (United States)

    2012-03-07

    ... dryer usage factor; and (5) replaces the current representative load size calculation in the drying... specifications for the dryer to be used for bone-drying the test cloth; (10) clarifies the procedures for.... 12 at p. 4-5) NEEA expressed concern that the definition of the active washing mode leaves out...

  3. 75 FR 2122 - Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of...

    Science.gov (United States)

    2010-01-14

    ... Energy Consumption of Refrigerator-Freezers With Automatic Ice Makers AGENCY: Office of the General...) to prescribe standardized test procedures to measure the energy consumption of certain consumer... Energy Consumption of Electric Refrigerators and Electric Refrigerator- Freezers (Appendix A1). DOE...

  4. 78 FR 15807 - Energy Conservation Program: Test Procedures for Television Sets

    Science.gov (United States)

    2013-03-12

    ... displaying dynamic visual content from wired or wireless sources including but not limited to: * * *''. DOE...) standard ``CEA-2037-A, Determination of Television Average Power Consumption'' into the SNOPR. In today's SNOPR, DOE proposes to update the input power requirements in the TVs test procedure NOPR by referencing...

  5. 40 CFR 63.1365 - Test methods and initial compliance procedures.

    Science.gov (United States)

    2010-07-01

    ... permit limit applicable to the process vent. (D) Design analysis based on accepted chemical engineering... concentration, temperature, and the reaction kinetics of the constituents with the scrubbing liquid. The design... procedures specified in Method 8260 or 8270 in “Test Methods for Evaluating Solid Waste, Physical/Chemical...

  6. 78 FR 2340 - Energy Conservation Program: Test Procedures for Residential Water Heaters and Commercial Water...

    Science.gov (United States)

    2013-01-11

    ... corresponded to the levels in the American Society of Heating, Refrigerating and Air Conditioning Engineers... provides a brief history of DOE's more recent test procedure rulemakings related to residential water... performance (e.g., such as ambient air temperature, ambient relative humidity, and inlet water temperature...

  7. 77 FR 60318 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: 6-acetylmorphine (6-AM...

    Science.gov (United States)

    2012-10-03

    ... 2105-AE14 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: 6-acetylmorphine... 12866 and Regulatory Flexibility Act This Final Rule is not significant for purposes of Executive Order... certify, under the Regulatory Flexibility Act, that this rule does not have a significant economic impact...

  8. 75 FR 8528 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-25

    ... OST 2105-AD84 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office... of small entities, for purposes of the Regulatory Flexibility Act. The Department makes these... necessary for the Department to conduct a regulatory evaluation or Regulatory Flexibility Analysis for this...

  9. 78 FR 42719 - Test Procedures for Showerheads, Faucets, Water Closets, Urinals, and Commercial Prerinse Spray...

    Science.gov (United States)

    2013-07-17

    ... flow control insert of showerheads for purposes of amending DOE test procedures. In addition, DOE... may be publicly available, such as information that is exempt from public disclosure. A link to the docket Web page can be found at www.regulations.gov . The www.regulations.gov Web page contains a link to...

  10. 76 FR 65631 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2011-10-24

    ... Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable... residential microwave ovens. DOE specifically is seeking information, data, and comments regarding representative and repeatable methods for measuring the energy use of microwave-only ovens and combination...

  11. Performance and Health Test Procedure for Grid Energy Storage Systems: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Baggu, Murali M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Smith, Kandler A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Friedl, Andrew [San Diego Gas and Electric; Bialek, Thomas [San Diego Gas and Electric; Schimpe, Michael Robert [Technical University of Munich

    2017-07-27

    A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: Round-trip efficiency, Standby losses, Response time/accuracy, and Useable Energy/ State of Charge at different discharge/charge rates over the system's lifetime. The procedures are divided into Reference Performance Tests, which require the system to be put in a test mode and are to be conducted in intervals, and Real-time Monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.

  12. CENRTC Project No. 2F3EOA, OCB A-372, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC No. 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00038/M (CENRTC 2F3EOA MWTT OCB A-372 PACKAGE)

  13. 78 FR 63410 - Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment...

    Science.gov (United States)

    2013-10-24

    ... test procedures for direct heating equipment and pool heaters established under the Energy Policy and... U.S.C. 6293(e)(2)) The current energy conservation standards for direct heating equipment and pool... DEPARTMENT OF ENERGY 10 CFR Part 430 [Docket Number EERE-2013-BT-TP-0004] RIN 1904-AC94 Energy...

  14. 76 FR 63211 - Energy Efficiency Program: Test Procedures for Residential Water Heaters, Direct Heating...

    Science.gov (United States)

    2011-10-12

    ... DEPARTMENT OF ENERGY 10 CFR Part 430 [Docket Number EERE-2011-BT-TP-0042] RIN 1904-AC53 Energy Efficiency Program: Test Procedures for Residential Water Heaters, Direct Heating Equipment, and Pool Heaters AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Request for...

  15. 40 CFR 205.54-1 - Low speed sound emission test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Low speed sound emission test procedures. 205.54-1 Section 205.54-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205...

  16. 75 FR 57555 - Energy Conservation Program for Consumer Products: Test Procedure for Residential Clothes Washers

    Science.gov (United States)

    2010-09-21

    ... technologies not covered by the current procedure; (2) more accurately reflect current consumer behavior and... Part II Department of Energy 10 CFR Part 430 Energy Conservation Program for Consumer Products... [Docket No. EERE-2010-BT-TP-0021] RIN 1904-AC08 Energy Conservation Program for Consumer Products: Test...

  17. 75 FR 57556 - Energy Conservation Program for Consumer Products: Test Procedure for Residential Clothes Washers

    Science.gov (United States)

    2010-09-21

    ... technologies not covered by the current procedure; (2) more accurately reflect current consumer behavior and... Part II Department of Energy 10 CFR Part 430 Energy Conservation Program for Consumer Products... [Docket No. EERE-2010-BT-TP-0021] RIN 1904-AC08 Energy Conservation Program for Consumer Products: Test...

  18. 75 FR 34064 - Manufactured Home Construction and Safety Standards, Test Procedures for Roof Trusses

    Science.gov (United States)

    2010-06-16

    ... failure. Failure is rupture, fracture, or excessive yielding. (v) Final recovery phase. Remove 2.0 times... members of the public. Commenters should follow the instructions provided on that site to submit comments... nondestructive testing procedure for roof trusses that permits a lower overall factor of safety to be used in...

  19. 76 FR 25211 - Energy Conservation Program: Test Procedures for Fluorescent Lamp Ballasts

    Science.gov (United States)

    2011-05-04

    ...-government procurement policies that specify high efficiency ballasts. (CA IOUs, No. 19 at p. 2; NRDC, No. 21... luminous efficiency (BLE), which is measured directly using electrical measurements instead of the photometric measurements employed in the test procedure at Appendix Q. The calculation of BLE includes a...

  20. Development of a Laboratory Test Procedure to Evaluate Tack Coat Performance

    OpenAIRE

    YILDIRIM, Yetkin; SMIT, André de Fortier; KORKMAZ, Armagan

    2014-01-01

    A laboratory testing procedure is presented, the results of which may be used for determining the best combination of tack coat type, mixture type, and application rate to be applied in the field for optimum performance. Tack coat related performance results were determined from Hamburg wheel tracking and simple shear tests on laboratory prepared specimens. This study was undertaken to evaluate the shear strength performance of tack coats under laboratory-controlled conditions. The ...

  1. Test-Induced Priming Impairs Source Monitoring Accuracy in the DRM Procedure

    OpenAIRE

    Dewhurst, S.; Knott, L.; Howe, M. L.

    2011-01-01

    Three experiments investigated the effects of test-induced priming (TIP) on false recognition in the Deese/Roediger-McDermott procedure. In Experiment 1, TIP significantly increased false recognition for participants who made old/new decisions at test but not for participants who made remember/know judgements or were given diagnostic information to help them avoid false recognition. In Experiment 2, a TIP effect was observed with old/new recognition but not when participants were required to ...

  2. Bureau of radiological health compliance testing procedures for cabinet S-ray systems

    International Nuclear Information System (INIS)

    Miller, E.A.; Sprau, D.

    1976-01-01

    A manual has been developed by the Bureau of Radiological Health of the Food and Drug Administration to establish procedures for the routine field testing of cabinet x-ray systems to determine compliance with the Federal Performance Standard for Cabinet X-Ray Systems, 21 CFR 1020.40. The manual provides specific instructions for testing each model of cabinet x-ray system. Results from the inspection are recorded on a data from which is designed to permit automatic data processing

  3. 40 CFR 53.63 - Test procedure: Wind tunnel inlet aspiration test.

    Science.gov (United States)

    2010-07-01

    ... the sampler inlet opening centered in the sampling zone. To meet the maximum blockage limit of § 53.62(c)(1) or for convenience, part of the test sampler may be positioned external to the wind tunnel... = reference method sampler volumetric flow rate; and t = sampling time. (iii) Remove the reference method...

  4. Psychometric testing of the properties of the spiritual health scale short form.

    Science.gov (United States)

    Hsiao, Ya-Chu; Chiang, Yi-Chien; Lee, Hsiang-Chun; Han, Chin-Yen

    2013-11-01

    To further examine the psychometric properties of the spiritual health scale short form, including its reliability and validity. Spirituality is one of the main factors associated with good health outcomes. A reliable and valid instrument to measure spirituality is essential to identify the spiritual needs of an individual and to evaluate the effect of spiritual care. A cross-sectional study design was used. The study was conducted in six nursing schools in northern, central and southern Taiwan. The inclusion criterion for participants was nursing students with clinical practice experience. Initially, 1141 participants were recruited for the study, but 67 were absent and 48 did not complete the questionnaires. A total of 1026 participants were finally recruited, indicating a response rate of 89·9%. The psychometric testing of the spiritual health scale short form included construct validity with confirmatory factor analysis, known-group validity and internal consistency reliability. The results of the confirmatory factor analysis supported the five-factor model as an acceptable model fit. In the known-group validity, the results indicated that people who are in the category of primary religious affiliation have better spiritual health than people in the category of secondary religious affiliation and atheism. The result also indicated that the 24-item spiritual health scale short form achieved an acceptable internal consistency coefficient. The findings suggest that the spiritual health scale short form is a valid and reliable instrument for the appraisal of individual spiritual health. The spiritual health scale short form could provide useful information to guide clinical practice in assessing and managing people's spiritual health in Taiwan. © 2013 John Wiley & Sons Ltd.

  5. Modified SPC for short run test and measurement process in multi-stations

    Science.gov (United States)

    Koh, C. K.; Chin, J. F.; Kamaruddin, S.

    2018-03-01

    Due to short production runs and measurement error inherent in electronic test and measurement (T&M) processes, continuous quality monitoring through real-time statistical process control (SPC) is challenging. Industry practice allows the installation of guard band using measurement uncertainty to reduce the width of acceptance limit, as an indirect way to compensate the measurement errors. This paper presents a new SPC model combining modified guard band and control charts (\\bar{\\text{Z}} chart and W chart) for short runs in T&M process in multi-stations. The proposed model standardizes the observed value with measurement target (T) and rationed measurement uncertainty (U). S-factor (S f) is introduced to the control limits to improve the sensitivity in detecting small shifts. The model was embedded in automated quality control system and verified with a case study in real industry.

  6. Within-day variability on short and long walking tests in persons with multiple sclerosis.

    Science.gov (United States)

    Feys, Peter; Bibby, Bo; Romberg, Anders; Santoyo, Carme; Gebara, Benoit; de Noordhout, Benoit Maertens; Knuts, Kathy; Bethoux, Francois; Skjerbæk, Anders; Jensen, Ellen; Baert, Ilse; Vaney, Claude; de Groot, Vincent; Dalgas, Ulrik

    2014-03-15

    To compare within-day variability of short (10 m walking test at usual and fastest speed; 10MWT) and long (2 and 6-minute walking test; 2MWT/6MWT) tests in persons with multiple sclerosis. Observational study. MS rehabilitation and research centers in Europe and US within RIMS (European network for best practice and research in MS rehabilitation). Ambulatory persons with MS (Expanded Disability Status Scale 0-6.5). Subjects of different centers performed walking tests at 3 time points during a single day. 10MWT, 2MWT and 6MWT at fastest speed and 10MWT at usual speed. Ninety-five percent limits of agreement were computed using a random effects model with individual pwMS as random effect. Following this model, retest scores are with 95% certainty within these limits of baseline scores. In 102 subjects, within-day variability was constant in absolute units for the 10MWT, 2MWT and 6MWT at fastest speed (+/-0.26, 0.16 and 0.15m/s respectively, corresponding to +/-19.2m and +/-54 m for the 2MWT and 6MWT) independent on the severity of ambulatory dysfunction. This implies a greater relative variability with increasing disability level, often above 20% depending on the applied test. The relative within-day variability of the 10MWT at usual speed was +/-31% independent of ambulatory function. Absolute values of within-day variability on walking tests at fastest speed were independent of disability level and greater with short compared to long walking tests. Relative within-day variability remained overall constant when measured at usual speed. Crown Copyright © 2014. Published by Elsevier B.V. All rights reserved.

  7. Spline-procedures

    International Nuclear Information System (INIS)

    Schmidt, R.

    1976-12-01

    This report contains a short introduction to spline functions as well as a complete description of the spline procedures presently available in the HMI-library. These include polynomial splines (using either B-splines or one-sided basis representations) and natural splines, as well as their application to interpolation, quasiinterpolation, L 2 -, and Tchebycheff approximation. Special procedures are included for the case of cubic splines. Complete test examples with input and output are provided for each of the procedures. (orig.) [de

  8. [Procedure of seed quality testing and seed grading standard of Prunus humilis].

    Science.gov (United States)

    Wen, Hao; Ren, Guang-Xi; Gao, Ya; Luo, Jun; Liu, Chun-Sheng; Li, Wei-Dong

    2014-11-01

    So far there exists no corresponding quality test procedures and grading standards for the seed of Prunus humilis, which is one of the important source of base of semen pruni. Therefor we set up test procedures that are adapt to characteristics of the P. humilis seed through the study of the test of sampling, seed purity, thousand-grain weight, seed moisture, seed viability and germination percentage. 50 cases of seed specimens of P. humilis tested. The related data were analyzed by cluster analysis. Through this research, the seed quality test procedure was developed, and the seed quality grading standard was formulated. The seed quality of each grade should meet the following requirements: for first grade seeds, germination percentage ≥ 68%, thousand-grain weight 383 g, purity ≥ 93%, seed moisture ≤ 5%; for second grade seeds, germination percentage ≥ 26%, thousand-grain weight ≥ 266 g, purity ≥ 73%, seed moisture ≤9%; for third grade seeds, germination percentage ≥ 10%, purity ≥ 50%, thousand-grain weight ≥ 08 g, seed moisture ≤ 13%.

  9. Reconnaissance On Chi-Square Test Procedure For Determining Two Species Association

    Science.gov (United States)

    Marisa, Hanifa

    2008-01-01

    Determining the assosiation of two species by using chi-square test has been published. Utility of this procedure to plants species at certain location, shows that the procedure could not find "ecologically" association. Tens sampling units have been made to record some weeds species in Indralaya, South Sumatera. Chi square test; Xt2 = N[|(ad)-(bc)|-(N/2)]2/mnrs (Eq:1) on two species (Cleome sp and Eleusine indica) of the weeds shows positive assosiation; while ecologically in nature, there is no relationship between them. Some alternatives are proposed to this problem; simplified chi-square test steps, make further study to find out ecologically association, or at last, ignore it.

  10. Acceptance test procedure, 241-SY-101/241-C-106 shot loading system

    International Nuclear Information System (INIS)

    Ostrom, M.J.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations

  11. Measurement of consumption of sevoflurane for short pediatric anesthetic procedures: Comparison between dion′s method and dragger algorithm

    Directory of Open Access Journals (Sweden)

    Preet Mohinder Singh

    2013-01-01

    Methodology: One hundred pediatric patients scheduled for ophthalmological examination under anesthesia were included in the study. Anesthesia was induced and maintained using sevoflurane with oxygen and nitrous oxide (1:1 on Primus workstation (Drager Inc., Germany. Total sevoflurane consumed for each procedure was calculated using Dion′s equation and the values obtained from Drager Primus were noted and compared. Results: Both methods showed a very strong correlation (0.895 [P < 0.001]. Dion′s method underestimated consumption by 2.59 ml with limits of agreement between 5.188 ml and −0.008 ml. Both test results showed a strong correlation, but poor concordance. Conclusions: Dion′s method strongly correlates with Drager protocol although concordance between the two methods for measuring anesthetic gas consumption is poor. Dion′s method underestimates the consumption and with slight modification addressing this underestimation, it can be electronically incorporated in other workstations to overcome limitations of real-time measurement of inhalation agent consumption.

  12. Memory and other properties of multiple test procedures generated by entangled graphs.

    Science.gov (United States)

    Maurer, Willi; Bretz, Frank

    2013-05-10

    Methods for addressing multiplicity in clinical trials have attracted much attention during the past 20 years. They include the investigation of new classes of multiple test procedures, such as fixed sequence, fallback and gatekeeping procedures. More recently, sequentially rejective graphical test procedures have been introduced to construct and visualize complex multiple test strategies. These methods propagate the local significance level of a rejected null hypothesis to not-yet rejected hypotheses. In the graph defining the test procedure, hypotheses together with their local significance levels are represented by weighted vertices and the propagation rule by weighted directed edges. An algorithm provides the rules for updating the local significance levels and the transition weights after rejecting an individual hypothesis. These graphical procedures have no memory in the sense that the origin of the propagated significance level is ignored in subsequent iterations. However, in some clinical trial applications, memory is desirable to reflect the underlying dependence structure of the study objectives. In such cases, it would allow the further propagation of significance levels to be dependent on their origin and thus reflect the grouped parent-descendant structures of the hypotheses. We will give examples of such situations and show how to induce memory and other properties by convex combination of several individual graphs. The resulting entangled graphs provide an intuitive way to represent the underlying relative importance relationships between the hypotheses, are as easy to perform as the original individual graphs, remain sequentially rejective and control the familywise error rate in the strong sense. Copyright © 2012 John Wiley & Sons, Ltd.

  13. A P-value model for theoretical power analysis and its applications in multiple testing procedures

    Directory of Open Access Journals (Sweden)

    Fengqing Zhang

    2016-10-01

    Full Text Available Abstract Background Power analysis is a critical aspect of the design of experiments to detect an effect of a given size. When multiple hypotheses are tested simultaneously, multiplicity adjustments to p-values should be taken into account in power analysis. There are a limited number of studies on power analysis in multiple testing procedures. For some methods, the theoretical analysis is difficult and extensive numerical simulations are often needed, while other methods oversimplify the information under the alternative hypothesis. To this end, this paper aims to develop a new statistical model for power analysis in multiple testing procedures. Methods We propose a step-function-based p-value model under the alternative hypothesis, which is simple enough to perform power analysis without simulations, but not too simple to lose the information from the alternative hypothesis. The first step is to transform distributions of different test statistics (e.g., t, chi-square or F to distributions of corresponding p-values. We then use a step function to approximate each of the p-value’s distributions by matching the mean and variance. Lastly, the step-function-based p-value model can be used for theoretical power analysis. Results The proposed model is applied to problems in multiple testing procedures. We first show how the most powerful critical constants can be chosen using the step-function-based p-value model. Our model is then applied to the field of multiple testing procedures to explain the assumption of monotonicity of the critical constants. Lastly, we apply our model to a behavioral weight loss and maintenance study to select the optimal critical constants. Conclusions The proposed model is easy to implement and preserves the information from the alternative hypothesis.

  14. Specifications and test procedures for airline-type supplied-air suits

    International Nuclear Information System (INIS)

    Revoir, W.H.; Pritchard, J.A.; Davis, T.O.; Richards, C.P.; Wheat, L.D.

    1975-05-01

    Procedures and requirements have been established to permit airline-type supplied-air suits needed by contractors of the Energy Research and Development Administration to be tested for performance by the Respirator Research and Development Section, Industrial Hygiene Group, of the Los Alamos Scientific Laboratory, and to have the adequacy of the performance of these devices evaluated by the Los Alamos Scientific Laboratory Respirator Advisory Committee. Test equipment, test methods, and performance criteria for airline-type supplied-air suits are prescribed. (U.S.)

  15. Testing Procedures and Results of the Prototype Fundamental Power Coupler for the Spallation Neutron Source

    International Nuclear Information System (INIS)

    M. Stirbet; I.E. Campisi; E.F. Daly; G.K. Davis; M. Drury; P. Kneisel; G. Myneni; T. Powers; W.J. Schneider; K.M. Wilson; Y. Kang; K.A. Cummings; T. Hardek

    2001-01-01

    High-power RF testing with peak power in excess of 500 kW has been performed on prototype Fundamental Power Couplers (FPC) for the Spallation Neutron Source superconducting (SNS) cavities. The testing followed the development of procedures for cleaning, assembling and preparing the FPC for installation in the test stand. The qualification of the couplers has occurred for the time being only in a limited set of conditions (travelling wave, 20 pps) as the available RF system and control instrumentation are under improvement

  16. Experimental Testing Procedures and Dynamic Model Validation for Vanadium Redox Flow Battery Storage System

    DEFF Research Database (Denmark)

    Baccino, Francesco; Marinelli, Mattia; Nørgård, Per Bromand

    2013-01-01

    The paper aims at characterizing the electrochemical and thermal parameters of a 15 kW/320 kWh vanadium redox flow battery (VRB) installed in the SYSLAB test facility of the DTU Risø Campus and experimentally validating the proposed dynamic model realized in Matlab-Simulink. The adopted testing...... efficiency of the battery system. The test procedure has general validity and could also be used for other storage technologies. The storage model proposed and described is suitable for electrical studies and can represent a general model in terms of validity. Finally, the model simulation outputs...

  17. A test procedure for determining the influence of stress ratio on fatigue crack growth

    Science.gov (United States)

    Fitzgerald, J. H.; Wei, R. P.

    1974-01-01

    A test procedure is outlined by which the rate of fatigue crack growth over a range of stress ratios and stress intensities can be determined expeditiously using a small number of specimens. This procedure was developed to avoid or circumvent the effects of load interactions on fatigue crack growth, and was used to develop data on a mill annealed Ti-6Al-4V alloy plate. Experimental data suggest that the rates of fatigue crack growth among the various stress ratios may be correlated in terms of an effective stress intensity range at given values of K max. This procedure is not to be used, however, for determining the corrosion fatigue crack growth characteristics of alloys when nonsteady-state effects are significant.

  18. Set-up and Test Procedure for Suction Installation and Uninstallation of Bucket Foundation

    DEFF Research Database (Denmark)

    Koteras, Aleksandra Katarzyna

    This technical report describes the set-up and the test procedures for installation and uninstallation of medium-scale model of bucket foundation that can be performed in the geotechnical part of laboratory in Aalborg University. The installation of bucket foundation can be tested with the use of......) and loading frame used for those tests have been already used for axially static and cyclic loading of piles (Thomassen, 2015a) and for axially static and cyclic loading of bucket foundation (Vaitkunaite et al., 2015).......This technical report describes the set-up and the test procedures for installation and uninstallation of medium-scale model of bucket foundation that can be performed in the geotechnical part of laboratory in Aalborg University. The installation of bucket foundation can be tested with the use...... of suction under the bucket lid or by applying additional force through the hydraulic piston, forcing the bucket to penetrate into the soil. Tests for uninstallation are performed also with the use of water pressure, as a reverse process to the suction installation. Both installation and uninstallation tests...

  19. Design and test of a short mockup magnet for the superconducting undulator at the SSRF

    Energy Technology Data Exchange (ETDEWEB)

    Xu, Jieping, E-mail: jpxu@sinap.ac.cn; Ding, Yi; Cui, Jian; Zhang, Wei; Wang, Hongfei; Yin, Lixin [Department of Mechanical Engineering, Shanghai Institute of Applied Physics, Chinese Academy of Sciences, Shanghai 201204 (China)

    2016-07-27

    A superconducting planar undulator is under development at the Shanghai Synchrotron Radiation Facility (SSRF) to provide the SSRF users with higher photon fluxes at higher photon energies. A 5-period magnet was designed and built for feasibility study. The short mockup magnet is composed of NbTi/Cu winding and low carbon steel former and was tested in a vertical cryocooler-cooled cryostat. The nominal current of 387 A was reached after 2 quenches and the maximum current of 433.2 A was achieved. The magnetic field profile was measured and a peak field of 0.93 T was obtained when stably operating at 400 A.

  20. Two-photon collisions and short-distance tests of quantum chromodynamics

    International Nuclear Information System (INIS)

    Brodsky, S.J.

    1978-12-01

    The physics of two-photon collisions in e +- storage rings is reviewed with emphasis on the predictions of perturbative quantum chromodynamics for high transverse momentum reactions. It is noted that because of the remarkable scaling properties predicted by the theory, two-photon collisions may be proved one of the cleanest tests of the quantum chromodynamics picture of short distance hadron dynamics. In order to contrast these predictions for photon-induced reactions with those for incident hadrons, predictions from quantum chromodynamics for hadron structure functions and form factors at large momentum transfer are also discussed. 55 references

  1. A procedure for the significance testing of unmodeled errors in GNSS observations

    Science.gov (United States)

    Li, Bofeng; Zhang, Zhetao; Shen, Yunzhong; Yang, Ling

    2018-01-01

    It is a crucial task to establish a precise mathematical model for global navigation satellite system (GNSS) observations in precise positioning. Due to the spatiotemporal complexity of, and limited knowledge on, systematic errors in GNSS observations, some residual systematic errors would inevitably remain even after corrected with empirical model and parameterization. These residual systematic errors are referred to as unmodeled errors. However, most of the existing studies mainly focus on handling the systematic errors that can be properly modeled and then simply ignore the unmodeled errors that may actually exist. To further improve the accuracy and reliability of GNSS applications, such unmodeled errors must be handled especially when they are significant. Therefore, a very first question is how to statistically validate the significance of unmodeled errors. In this research, we will propose a procedure to examine the significance of these unmodeled errors by the combined use of the hypothesis tests. With this testing procedure, three components of unmodeled errors, i.e., the nonstationary signal, stationary signal and white noise, are identified. The procedure is tested by using simulated data and real BeiDou datasets with varying error sources. The results show that the unmodeled errors can be discriminated by our procedure with approximately 90% confidence. The efficiency of the proposed procedure is further reassured by applying the time-domain Allan variance analysis and frequency-domain fast Fourier transform. In summary, the spatiotemporally correlated unmodeled errors are commonly existent in GNSS observations and mainly governed by the residual atmospheric biases and multipath. Their patterns may also be impacted by the receiver.

  2. Containment integrity and leak testing. Procedures applied and experiences gained in European countries

    International Nuclear Information System (INIS)

    1987-01-01

    Containment systems are the ultimate safety barrier for preventing the escape of gaseous, liquid and solid radioactive materials produced in normal operation, not retained in process systems, and for keeping back radioactive materials released by system malfunction or equipment failure. A primary element of the containment shell is therefore its leak-tight design. The report describes the present containment concepts mostly used in European countries. The leak-testing procedures applied and the experiences gained in their application are also discussed. The report refers more particularly to pre-operational testing, periodic testing and extrapolation methods of leak rates measured at test conditions to expected leak rates at calculated accident conditions. The actual problems in periodic containment leak rate testing are critically reviewed. In the appendix to the report a summary is given of the regulations and specifications applied in different member countries

  3. Medium Voltage Microgrid Test Setup and Procedures Implemented on a Real Pilot Project

    Directory of Open Access Journals (Sweden)

    Bruno Alberto Pacheco

    2018-01-01

    Full Text Available This paper presents various concepts related to the application of a microgrid pilot project in a residential condominium at Fortaleza / CE – Brazil, such as battery energy system, renewable and distributed generation, islanding recloser and all different units using interface based on power electronics. This papers main objective is to create information about microgrid operation and the interaction between its main equipment, such as power converters, utility energy distribution system and control units responsible for algorithms and changes in microgrids operation mode. This information is important for understanding the need for a test setup construction. To perform the test procedures, a temporary setup in a controlled environment within the microgrid is proposed. During the test periods, intentional power outages are required to evaluate the operating mode switching on each unit. The test setup described in this paper aims to mitigate the tests effects on other residential units inside the condominium.

  4. Alternative procedure for the cold test for soybean seeds Procedimento alternativo para o teste de frio em semente de soja

    Directory of Open Access Journals (Sweden)

    Bruno Guilherme Torres Licursi Vieira

    2010-10-01

    Full Text Available The growing demand for high quality soybean [Glycine max (L. Merrill] seeds requires a precise seed quality control system from the seed industry. One way to accomplish this is by improving vigor testing. Cold test has been traditionally employed for corn seeds. However, it has also been used for other seed crops such as cotton (Gossypium spp., soybean (Glycine Max, dry bean (Phaseolus vulgaris and pea (Pisum sativum. This study was carried out with the objective of adjusting an alternative procedure for the cold test to determine soybean seed vigor. Six commercial soybean seed lots of the cultivar BRS 133 were used. The physiological potential of the seed lots was evaluated by germination on paper towel and sand box, seedling field emergence, tetrazolium, accelerated aging and electrical conductivity tests. Seed moisture content was also determined. The temperature used for the cold test procedures was 10ºC during five days. Four cold test procedures were evaluated: i plastic boxes with soil; ii rolled paper towel with soil; iii rolled paper towel without soil, and iv an alternative procedure, using rolled paper towel without soil under cold water. A completely randomized experimental design with eight replications was used and the means were compared by the Tukey test (p = 0.05. To verify the dependence between the alternative test and others single linear correlation was used. All cold test procedures had similar coefficients of variation (CV, highlighting that rolled paper towel with soil and the alternative procedure had the best performance, with an average of 94% and 93% normal seedlings and CV of 3.2% and 3.6%, respectively. The alternative procedure has satisfactory results for estimating soybean seed vigor, yielding consistent results compared to the traditional procedure.A crescente demanda por semente de soja [Glycine max (L. Merrill] de alta qualidade tem requerido da indústria de sementes um controle de qualidade mais preciso

  5. European wind turbine testing procedure developments. Task 1: Measurement method to verify wind turbine performance characteristics

    DEFF Research Database (Denmark)

    Hunter, R.; Friis Pedersen, Troels; Dunbabin, P.

    2001-01-01

    There is currently significant standardisation work ongoing in the context of wind farm energy yield warranty assessment and wind turbine power performance testing. A standards maintenance team is revising the current IEC (EN) 61400-12 Ed 1 standard forwind turbine power performance testing....... The standard is being divided into four documents. Two of them are drafted for evaluation and verification of complete wind farms and of individual wind turbines within wind farms. This document, and the project itdescribes, has been designed to help provide a solid technical foundation for this revised...... standard. The work was wide ranging and addressed 'grey' areas of knowledge, regarding existing methodologies or to carry out basic research in support offundamentally new procedures. The work has given rise to recommendations in all areas of the work, including site calibration procedures, nacelle...

  6. European wind turbine testing procedure developments. Task 1: Measurement method to verify wind turbine performance characteristics

    Energy Technology Data Exchange (ETDEWEB)

    Hunter, R.; Friis Pedersen, T.; Dunbabin, P.; Antoniou, I.; Frandsen, S.; Klug, H.; Albers, A.; Lee, W.K.

    2001-01-01

    There is currently significant standardisation work ongoing in the context of wind farm energy yield warranty assessment and wind turbine power performance testing. A standards maintenance team is revising the current IEC (EN) 61400-12 Ed 1 standard for wind turbine power performance testing. The standard is being divided into four documents. Two of them are drafted for evaluation and verification of complete wind farms and of individual wind turbines within wind farms. This document, and the project it describes, has been designed to help provide a solid technical foundation for this revised standard. The work was wide ranging and addressed 'grey' areas of knowledge, regarding existing methodologies or to carry out basic research in support of fundamentally new procedures. The work has given rise to recommendations in all areas of the work, including site calibration procedures, nacelle anemometry, multi-variate regression analysis and density normalisation. (au)

  7. The development of synthetic test procedure for hot cell equipment systems in IMEF

    International Nuclear Information System (INIS)

    Ahn, Sang Bok; Lee, Key Soon; Park, Dae Kyu; Hong, Kwon Pyo; Choo, Yong Sun

    1998-04-01

    Hot cell facility should be confirmed to operation safety through pre-commissioning test after construction. In this report, the detailed procedure of hot cell equipment are described. The contents are as follows: 1. Entrance equipment of hot cell 2. Specimen transportation equipment between hot cells 3. Waste discharge equipment in hot cell 4. Specimen loading equipment to hot cell 5. Interlinking equipment in hot cell. (author). 4 tabs

  8. A validity generalization procedure to test relations between intrinsic and extrinsic motivation and influence tactics.

    Science.gov (United States)

    Barbuto, John E; Moss, Jennifer A

    2006-08-01

    The relations of intrinsic and extrinsic motivation with use of consultative, legitimating, and pressure influence tactics were examined using validity generalization procedures. 5 to 7 field studies with cumulative samples exceeding 800 were used to test each relationship. Significance was found for relation between agents' intrinsic motivation and their use of consultative influence tactics and agents' extrinsic motivation and their use of legitimating influence tactics.

  9. Test Operations Procedure (TOP) 1-1-062 Environmental Effects Data Collection

    Science.gov (United States)

    2008-09-12

    this procedure. 11. ESTIMATION DESCRIPTION The prime example of an empirically based model is the Universal Soil Loss Equation ( USLE ) developed...impacts to human health and welfare and to the natural environment. The type of data collected might include noise levels, soil erosion, and...uptake relevant to flora/fauna and the soil erosion effects of proposed testing. c. Plan to identify any modifications/alternatives implemented

  10. Effects of acute caffeine withdrawal on Short Category Test performance in sleep-deprived individuals.

    Science.gov (United States)

    Killgore, William D S; Kahn-Greene, Ellen T; Killgore, Desiree B; Kamimori, Gary H; Balkin, Thomas J

    2007-12-01

    Caffeine is a popular stimulant often used to counter the effects of sleep loss and fatigue. Withdrawal from caffeine may produce mild declines in simple cognitive capacities such as attention and concentration, but it is unclear whether more complex cognitive functions, such as abstract reasoning or concept formation, may be similarly affected. To assess the effect of acute caffeine withdrawal on executive functioning during sleep deprivation, 26 healthy volunteers were administered in double-blind form either repeated doses of caffeine or placebo over two nights of continuous wakefulness. The 108-item Short Category Test was administered after 56 hr. of total sleep deprivation (9 hr. post-caffeine administration). The caffeine group scored significantly more poorly, making approximately 57% more errors on the test than the placebo group. These findings suggest that acute caffeine withdrawal during prolonged sleep deprivation has an adverse effect on abstract reasoning and concept formation.

  11. Development of a testing methodology for computerized procedure system based on JUnit framework and MFM

    International Nuclear Information System (INIS)

    Qin, Wei

    2004-02-01

    Paper Based Procedure (PBP) and Computerized Procedure System (CPS) are studied to demonstrate that it is necessary to develop CPS in Nuclear Power Plant (NPP) Instrumentation and Control (I and C) system. Computerized procedure system is actually a software system. All the desired and undesired properties of a software system can be described and evaluated as software qualities. Generally, software qualities can be categorized into product quality and process quality. In order to achieve product quality, the process quality of a software system should also be considered and achieved. Characteristics of CPS will be described to analyse the product and process of an example CPS: ImPRO. At the same time, several main product and process issues will be analysed from Verification and Validation (V and V) point of view. It is concluded and suggested that V and V activities can also be regarded as a software development process, this point of view then is applied to the V and V activities of ImPRO as a systematic approach of testing of ImPRO. To support and realize this approach, suitable testing technologies and testing strategies are suggested based on JUnit framework and Multi-level Flow Modeling (MFM)

  12. Validity of a new assessment rubric for a short-answer test of clinical reasoning.

    Science.gov (United States)

    Yeung, Euson; Kulasagarem, Kulamakan; Woods, Nicole; Dubrowski, Adam; Hodges, Brian; Carnahan, Heather

    2016-07-26

    The validity of high-stakes decisions derived from assessment results is of primary concern to candidates and certifying institutions in the health professions. In the field of orthopaedic manual physical therapy (OMPT), there is a dearth of documented validity evidence to support the certification process particularly for short-answer tests. To address this need, we examined the internal structure of the Case History Assessment Tool (CHAT); this is a new assessment rubric developed to appraise written responses to a short-answer test of clinical reasoning in post-graduate OMPT certification in Canada. Fourteen physical therapy students (novices) and 16 physical therapists (PT) with minimal and substantial OMPT training respectively completed a mock examination. Four pairs of examiners (n = 8) participated in appraising written responses using the CHAT. We conducted separate generalizability studies (G studies) for all participants and also by level of OMPT training. Internal consistency was calculated for test questions with more than 2 assessment items. Decision studies were also conducted to determine optimal application of the CHAT for OMPT certification. The overall reliability of CHAT scores was found to be moderate; however, reliability estimates for the novice group suggest that the scale was incapable of accommodating for scores of novices. Internal consistency estimates indicate item redundancies for several test questions which will require further investigation. Future validity studies should consider discriminating the clinical reasoning competence of OMPT trainees strictly at the post-graduate level. Although rater variance was low, the large variance attributed to error sources not incorporated in our G studies warrant further investigations into other threats to validity. Future examination of examiner stringency is also warranted.

  13. Review of short-term screening tests for mutagens, toxigens, and carcinogens

    Energy Technology Data Exchange (ETDEWEB)

    Carney, H.J.; Hass, B.S.

    1979-07-01

    In order to test the thousands of man-made chemicals in the environment for carcinogenic and genetic hazards, a multitude of short-term screening tests has been developed to complement long-term mammalian bioassays and epidemiological studies. These tests cover a broad spectrum of organisms, and include the use of naked and viral nucleic acids, bacteria, fungi, higher plants, insects in vitro mammalian cell cultures (cell transformation, cell-mediated mutagenesis, DNA repair, and chromosome aberration tests) and live mammals. Assay end points include effects on nucleic acids, DNA repair synthesis, point or gene mutation, structural and numerical chromosome aberrations, cytological alterations, and in vitro cell transformation. The present review describes and compares these assays. In addition, it discusses their historical development, the problems and limitations associated with their use, and their implementation in comprehensive testing programs. It is intended to provide overview and specific information to the laboratory that is in the process of establishing genetic toxicological systems. (The literature is reviewed to January 1978.)

  14. Assessment of Calculation Procedures for Piles in Clay Based on Static Loading Tests

    DEFF Research Database (Denmark)

    Augustesen, Anders; Andersen, Lars

    2008-01-01

    College in London. The calculation procedures are assessed based on an established database of static loading tests. To make a consistent evaluation of the design methods, corrections related to undrained shear strength and time between pile driving and testing have been employed. The study indicates...... that the interpretation of the field tests is of paramount importance, both with regard to the soil profile and the loading conditions. Based on analyses of 253 static pile loading tests distributed on 111 sites, API-RP2A provides the better description of the data. However, it should be emphasised that some input......Numerous methods are available for the prediction of the axial capacity of piles in clay. In this paper, two well-known models are considered, namely the current API-RP2A (1987 to present) and the recently developed ICP method. The latter is developed by Jardine and his co-workers at Imperial...

  15. A step-up test procedure to find the minimum effective dose.

    Science.gov (United States)

    Wang, Weizhen; Peng, Jianan

    2015-01-01

    It is of great interest to find the minimum effective dose (MED) in dose-response studies. A sequence of decreasing null hypotheses to find the MED is formulated under the assumption of nondecreasing dose response means. A step-up multiple test procedure that controls the familywise error rate (FWER) is constructed based on the maximum likelihood estimators for the monotone normal means. When the MED is equal to one, the proposed test is uniformly more powerful than Hsu and Berger's test (1999). Also, a simulation study shows a substantial power improvement for the proposed test over four competitors. Three R-codes are provided in Supplemental Materials for this article. Go to the publishers online edition of Journal of Biopharmaceutical Statistics to view the files.

  16. Developing Field Test Procedures for Chloride Stress Corrosion Cracking in the Arabian Gulf

    Directory of Open Access Journals (Sweden)

    Hanan Farhat

    2018-01-01

    Full Text Available Oil and gas production and petrochemical plants in the Arabian Gulf are exposed to severe environmental conditions of high temperature and humidity. This makes these plants susceptible to chloride-induced stress corrosion cracking (CSCC. The laboratory testing fails to provide the exact field environmental conditions. A cost efficient field test setup for CSCC was designed and developed for the Arabian Gulf. The setup included designing self-sustained loading devices, samples, and sample racks. The samples were exposed to a stress equivalent to 80% and 100% of their yield strength. This paper describes the developed test procedures to establish testing with high level of accuracy and repeatability. It also discusses the design aspects and the challenges that were met.

  17. Test-Retest Reliability of the Short-Form Survivor Unmet Needs Survey.

    Science.gov (United States)

    Taylor, Karen; Bulsara, Max; Monterosso, Leanne

    2018-01-01

    Reliable and valid needs assessment measures are important assessment tools in cancer survivorship care. A new 30-item short-form version of the Survivor Unmet Needs Survey (SF-SUNS) was developed and validated with cancer survivors, including hematology cancer survivors; however, test-retest reliability has not been established. The objective of this study was to assess the test-retest reliability of the SF-SUNS with a cohort of lymphoma survivors ( n = 40). Test-retest reliability of the SF-SUNS was conducted at two time points: baseline (time 1) and 5 days later (time 2). Test-retest data were collected from lymphoma cancer survivors ( n = 40) in a large tertiary cancer center in Western Australia. Intraclass correlation analyses compared data at time 1 (baseline) and time 2 (5 days later). Cronbach's alpha analyses were performed to assess the internal consistency at both time points. The majority (23/30, 77%) of items achieved test-retest reliability scores 0.45-0.74 (fair to good). A high degree of overall internal consistency was demonstrated (time 1 = 0.92, time 2 = 0.95), with scores 0.65-0.94 across subscales for both time points. Mixed test-retest reliability of the SF-SUNS was established. Our results indicate the SF-SUNS is responsive to the changing needs of lymphoma cancer survivors. Routine use of cancer survivorship specific needs-based assessments is required in oncology care today. Nurses are well placed to administer these assessments and provide tailored information and resources. Further assessment of test-retest reliability in hematology and other cancer cohorts is warranted.

  18. Recommended procedures for performance testing of radiobioassay laboratories: Volume 1, Quality assurance

    International Nuclear Information System (INIS)

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed in response to a concern expressed by the US Department of Energy and US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped define responsibilities and develop procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria for quality assurance at bioassay laboratories. This report recommends elements of quality assurance and quality control responsibilities for the bioassay performance-testing laboratory program, including the qualification and performance of personnel and the calibration, certification, and performance of equipment. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 15 refs

  19. ASK Procedure for Instrumented Pre-cracked Charpy-Type Tests

    International Nuclear Information System (INIS)

    Varga, T.; Njo, D.H.; Prantl, G.

    1981-01-01

    The essential technical content of the ASK procedure originated from development work in Switzerland since 1963, and practical experiences gained since 1972. The remainder of the content and the format of the procedure are based on the ASTM E 24.03.03. (Tentative Draft Copy) 'Proposed Method for Pre-cracked Charpy Impact and Slow-Bend Testing of Metallic Materials' by C. E. Harbower, 1973. Two different velocities, 5 m/s and 0.1 m/s were used with a Schnadt-type machine of rigid construction. The stiffness of the machine proved to be very suitable for instrumented testing. The instrumented Schnadt-Type machine was equipped with strain gauges both on the top of the pendulum and on the chisel. A static force calibration was followed by energy calibration, comparing potential energy losses with the area under the force-deflection curve. Deflection was measured using a high frequency eddy current method on the pendulum, and for slow testing by means of an inductive gauge on the chisel. Charpy-Type specimens of 1.0 mm max notch depth and 0.12 mm max notch radius were pre-cracked using a resonant fatigue testing machine, or an eccentric drive machine. Crack propagation rate da/dN was measured using 'Russenberger' measuring gauges. In addition a new technique for the detection of dynamic crack initiation, developed at the Institute of Research and Technology (TVFA) in Vienna is discussed and some results presented

  20. Simulation and analysis of data for enhancing low cycle fatigue test procedures

    Energy Technology Data Exchange (ETDEWEB)

    Sarajaervi, U.; Cronvall, O. [VTT Technical Research Centre of Finland (Finland)

    2006-04-15

    The simulation and analysis of data for enhancing low cycle fatigue test procedures is discussed in this report. The analysed materials are an austenitic stainless piping steel and an austenitic weld material. This project continues the work performed in 2003 and 2004. The fatigue test data treatment application developed within the project in 2004 for the preparation of the fatigue data has been developed further. Also, more fatigue test data has been analysed with the application than in 2004. In addition to this numerical fatigue simulations were performed with FEM code ABAQUS. With the fatigue test data treatment application one can e.g. both calculate cyclically certain relevant characteristic values, e.g. elastic range, and form a set of certain cyclical parameter values needed as a part of ABAQUS analysis input files. The hardening properties of metals were modelled with both isotropic and kinematic hardening models. The further development of the application included trimming of the analysed data, and consequently trimming of resulting hardening parameters. The need for the trimming arose from the fact that the analysed fatigue test data presents some scatter caused by the limited accuracy of the test equipment and the sampling rate. The hardening parameters obtained from the application analysis results were used in the subsequent ABAQUS analyses, and then the fatigue test data were compared with the ABAQUS simulation results. After finding a procedure to trim result data to get smooth curves for cyclic hardening, hardening and softening could be reproduced in ABAQUS analysis with a reasonable accuracy. The modelling of the fatigue induced initiation and growth of cracks was not considered in this study. On the other hand, a considerable part of the fatigue life of nuclear power plant (NPP) piping components is spent in the phase preceding the initiation and growth of cracks. (au)