WorldWideScience

Sample records for shock test procedure

  1. Shock resistance testing

    International Nuclear Information System (INIS)

    Pouard, M.

    1984-03-01

    In the framework of mechanical tests and to answer the different requests for tests, the T.C.R (Transport Conditionnement et Retraitement) laboratory got test facilities. These installations allow to carry out tests of resistance to shocks, mainly at the safety level of components of nuclear power plants, mockups of transport casks for fuel elements and transport containers for radioactive materials. They include a tower and a catapult. This paper give a decription of the facilities and explain their operation way [fr

  2. Shock Isolation Elements Testing for High Input Loadings. Volume II. Foam Shock Isolation Elements.

    Science.gov (United States)

    SHOCK ABSORBERS ), (*GUIDED MISSILE SILOS, SHOCK ABSORBERS ), (*EXPANDED PLASTICS, (*SHOCK(MECHANICS), REDUCTION), TEST METHODS, SHOCK WAVES, STRAIN(MECHANICS), LOADS(FORCES), MATHEMATICAL MODELS, NUCLEAR EXPLOSIONS, HARDENING.

  3. Shock Isolation Elements Testing for High Input Loadings. Volume III. Mechanical Shock Isolation Elements.

    Science.gov (United States)

    SHOCK ABSORBERS ), (*GUIDED MISSILE SILOS, SHOCK ABSORBERS ), (*SPRINGS, (*SHOCK(MECHANICS), REDUCTION), TORSION BARS, ELASTOMERS, DAMPING, EQUATIONS OF MOTION, MODEL TESTS, TEST METHODS, NUCLEAR EXPLOSIONS, HARDENING.

  4. Dynamic testing of adhesive joints using a shock testing machine

    NARCIS (Netherlands)

    Aanhold, J.E. van; Weersink, A.F.J.; Ludolphy, J.W.L.

    1998-01-01

    A light-weight shock testing machine, designed for type approval testing of naval equipment up to 300 kg mass, has been modified into a dynamic tensile test rig. This enables to test structural details for high rate dynamic tensile loadings such as occur during underwater shock. The maximum capacity

  5. 33 CFR 183.584 - Shock test.

    Science.gov (United States)

    2010-07-01

    ... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.584 Shock test. A fuel tank is tested by... the boat, apply 1000 cycles of 25g vertical accelerations at a rate of 80 cycles or less per minute... manufactured for installation with its center of gravity aft of the half length of the boat, apply 1000 cycles...

  6. Small-Scale Shock Testing of Propellants and Ingredients

    National Research Council Canada - National Science Library

    Dawley, S

    2004-01-01

    .... The use of small-scale gap testing to evaluate the shock sensitivity of individual propellant ingredients and propellant formulations is a valuable method for experimentally establishing shock...

  7. Automation of the testing procedure

    International Nuclear Information System (INIS)

    Haas, H.; Fleischer, M.; Bachner, E.

    1979-01-01

    For the judgement of technologies applied and the testing of specific components of the HTR primary circuit, complex test procedures and data evaluations are required. Extensive automation of these test procedures is indispensable. (orig.) [de

  8. Toddler test or procedure preparation

    Science.gov (United States)

    ... a test or procedure: Explain the procedure in language your child understands, using plain words. Avoid abstract terms. Make sure your child understands the exact body part involved in the test, and that the ...

  9. Dynamic testing of airplane shock-absorbing struts

    Science.gov (United States)

    Langer, P; Thome, W

    1932-01-01

    Measurement of perpendicular impacts of a landing gear with different shock-absorbing struts against the drum testing stand. Tests were made with pneumatic shock absorbers having various degrees of damping, liquid shock absorbers, steel-spring shock absorbers and rigid struts. Falling tests and rolling tests. Maximum impact and gradual reduction of the impacts in number and time in the falling tests. Maximum impact and number of weaker impacts in rolling tests.

  10. MITG test procedure and results

    International Nuclear Information System (INIS)

    Eck, M.E.; Mukunda, M.

    1983-01-01

    Elements and modules for Radioisotope Thermoelectric Generator have been performance tested since the inception of the RTG program. These test articles seldom resembled flight hardware and often lacked adequate diagnostic instrumentation. Because of this, performance problems were not identified in the early stage of program development. The lack of test data in an unexpected area often hampered the development of a problem solution. A procedure for conducting the MITG Test was developed in an effort to obtain data in a systematic, unambiguous manner. This procedure required the development of extensive data acquisition software and test automation. The development of a facility to implement the test procedure, the facility hardware and software requirements, and the results of the MITG testing are the subject of this paper

  11. Adolescent test or procedure preparation

    Science.gov (United States)

    ... someone else) during the procedure Playing hand-held video games Using guided imagery Trying other distractions, such as ... effects the test may cause. Older teens may benefit from videos that show adolescents of the same age explaining ...

  12. Inspection system performance test procedure

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1995-01-01

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system

  13. TMACS Test Procedure TP011: Panalarm Interface

    International Nuclear Information System (INIS)

    Seghers, R.; Washburn, S.J.

    1994-01-01

    The TMACS Software Test Procedures translate the project's acceptance criteria into test steps. The TMACS Test Plan (WHC-SD-WM-TP-148) is fulfilled when all Test Cases are approved. This Test Procedure tests the TMACS Panalarm Interface functions

  14. Conservatism implications of shock test tailoring for multiple design environments

    Science.gov (United States)

    Baca, Thomas J.; Bell, R. Glenn; Robbins, Susan A.

    1987-01-01

    A method for analyzing shock conservation in test specifications that have been tailored to qualify a structure for multiple design environments is discussed. Shock test conservation is qualified for shock response spectra, shock intensity spectra and ranked peak acceleration data in terms of an Index of Conservation (IOC) and an Overtest Factor (OTF). The multi-environment conservation analysis addresses the issue of both absolute and average conservation. The method is demonstrated in a case where four laboratory tests have been specified to qualify a component which must survive seven different field environments. Final judgment of the tailored test specification is shown to require an understanding of the predominant failure modes of the test item.

  15. TMACS Test Procedure TP009: Acromag Driver

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Acromag Software Driver (Bridge Code)

  16. TMACS Test Procedure TP007: System administration

    International Nuclear Information System (INIS)

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions

  17. TMACS Test Procedure TP002: Trending

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions

  18. A statistical procedure for testing financial contagion

    Directory of Open Access Journals (Sweden)

    Attilio Gardini

    2013-05-01

    Full Text Available The aim of the paper is to provide an analysis of contagion through the measurement of the risk premia disequilibria dynamics. In order to discriminate among several disequilibrium situations we propose to test contagion on the basis of a two-step procedure: in the first step we estimate the preference parameters of the consumption-based asset pricing model (CCAPM to control for fundamentals and to measure the equilibrium risk premia in different countries; in the second step we measure the differences among empirical risk premia and equilibrium risk premia in order to test cross-country disequilibrium situations due to contagion. Disequilibrium risk premium measures are modelled by the multivariate DCC-GARCH model including a deterministic crisis variable. The model describes simultaneously the risk premia dynamics due to endogenous amplifications of volatility and to exogenous idiosyncratic shocks (contagion, having controlled for fundamentals effects in the first step. Our approach allows us to achieve two goals: (i to identify the disequilibria generated by irrational behaviours of the agents, which cause increasing in volatility that is not explained by the economic fundamentals but is endogenous to financial markets, and (ii to assess the existence of contagion effect defined by exogenous shift in cross-country return correlations during crisis periods. Our results show evidence of contagion from the United States to United Kingdom, Japan, France, and Italy during the financial crisis which started in 2007-08.

  19. Preschooler test or procedure preparation

    Science.gov (United States)

    ... your child during and after the procedure with books, songs, counting, deep breathing, or blowing bubbles. PLAY ... can be present during the procedure. Ask if anesthesia can be used to reduce your child's discomfort. ...

  20. Hydride transport vessel vibration and shock test report

    Energy Technology Data Exchange (ETDEWEB)

    Tipton, D.G.

    1998-06-01

    Sandia National Laboratories performed vibration and shock testing on a Savannah River Hydride Transport Vessel (HTV) which is used for bulk shipments of tritium. This testing is required to qualify the HTV for transport in the H1616 shipping container. The main requirement for shipment in the H1616 is that the contents (in this case the HTV) have a tritium leak rate of less than 1x10{sup {minus}7} cc/sec after being subjected to shock and vibration normally incident to transport. Helium leak tests performed before and after the vibration and shock testing showed that the HTV remained leaktight under the specified conditions. This report documents the tests performed and the test results.

  1. Hydride transport vessel vibration and shock test report

    International Nuclear Information System (INIS)

    Tipton, D.G.

    1998-06-01

    Sandia National Laboratories performed vibration and shock testing on a Savannah River Hydride Transport Vessel (HTV) which is used for bulk shipments of tritium. This testing is required to qualify the HTV for transport in the H1616 shipping container. The main requirement for shipment in the H1616 is that the contents (in this case the HTV) have a tritium leak rate of less than 1x10 -7 cc/sec after being subjected to shock and vibration normally incident to transport. Helium leak tests performed before and after the vibration and shock testing showed that the HTV remained leaktight under the specified conditions. This report documents the tests performed and the test results

  2. The Shock and Vibration Bulletin. Part 1. Opening Session, Panel Session, Shock Analysis Shock Testing, Isolation and Damping.

    Science.gov (United States)

    1977-09-01

    ORTHOTROPIC PLATES WITH VARIOUS ,I PLANFORMS AND EDGE CONDITIONS C.W. Bert, The University of Oklahoma, Norman , OK - -’ DYNAMIC RESPONSE OF LAMINATED...EVALUATION OF AN ADAPTIVE FILTER AS A DIGITAL TRACKING FILTER D.O. Smallwood and D.L. Gregory, Sandia Laboratories, Albuquerque, NM TOTAL MISSION ENVIRONMENTAL...June 1967. ration Bulletin No. 40, Part 2, 1969. 6. J. P. Barthmaier, "Shock Testing Under 2. D. 0. Smallwood , "Time History Synthesis Minicomputer

  3. 40 CFR 205.54 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Test procedures. 205.54 Section 205.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.54 Test procedures. The procedures described...

  4. 16 CFR 1204.4 - Electric shock protection tests.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Electric shock protection tests. 1204.4 Section 1204.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT... the cable shall be between 28 and 29 feet (8.5 to 8.8 meters) above a horizontal plane through the...

  5. Test report - caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1995-01-01

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ''Caustic Addition System Operability Test Procedure''. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  6. Rail Impact Testing. Test Operations Procedure (TOP)

    Science.gov (United States)

    2008-09-15

    impact test. The rail impact test is used to verify structural integrity of the test item and the adequacy of the tie-down system and tie-down...strength of provisions, connection and supporting structural frame, paragraph 5.2.3 ** Superscript...parts, to include outriggers and booms) without advanced approval by SDDCTEA. Torque nuts on wire rope clips to their correct value. Torque cable

  7. Handbook of mutagenicity test procedures

    International Nuclear Information System (INIS)

    Kilbey, B.J.; Legatov, M.

    1977-01-01

    27 articles are presented on particular techniques of mutagen testing. Background information is given in materials, experimental design, pitfalls and difficults, to enable the reader to perform these tests with minimal additional help. Also included is the use of data from population records, the handling and safety aspects of mutagens and carcinogens and some of the basic statistical concepts to be borne in mind when mutation experiments are designed. (C.F.)

  8. 40 CFR 53.65 - Test procedure: Loading test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Loading test. 53.65... Characteristics of Class II Equivalent Methods for PM2.5 § 53.65 Test procedure: Loading test. (a) Overview. (1) The loading tests are designed to quantify any appreciable changes in a candidate method sampler's...

  9. 40 CFR 53.66 - Test procedure: Volatility test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Volatility test. 53.66... Characteristics of Class II Equivalent Methods for PM2.5 § 53.66 Test procedure: Volatility test. (a) Overview. This test is designed to ensure that the candidate method's losses due to volatility when sampling semi...

  10. Test procedures for salt rock

    International Nuclear Information System (INIS)

    Dusseault, M.B.

    1985-01-01

    Potash mining, salt mining, design of solution caverns in salt rocks, disposal of waste in salt repositories, and the use of granular halite backfill in underground salt rock mines are all mining activities which are practised or contemplated for the near future. Whatever the purpose, the need for high quality design parameters is evident. The authors have been testing salt rocks in the laboratory in a number of configurations for some time. Great care has been given to the quality of sample preparation and test methodology. This paper describes the methods, presents the elements of equipment design, and shows some typical results

  11. MITS Data Acquisition Subsystem Acceptance Test procedure

    International Nuclear Information System (INIS)

    Allison, R.

    1980-01-01

    This is an acceptance procedure for the Data Acquisition Subsystem of the Machine Interface Test System (MITS). Prerequisites, requirements, and detailed step-by-step instruction are presented for inspecting and performance testing the subsystem

  12. Caustic addition system operability test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E).

  13. Caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  14. 40 CFR 53.23 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... deviation about the mean and is expressed in concentration units. (2) Test procedure. (i) Allow sufficient... definition. Positive or negative response caused by a substance other than the one being measured. (2) Test...) Before testing for each interferent, allow the test analyzer to sample through the scrubber a test...

  15. W-087 Acceptance test procedure. Revision 1

    International Nuclear Information System (INIS)

    Joshi, A.W.

    1997-01-01

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks

  16. Acceptance test procedure for Project W-280

    International Nuclear Information System (INIS)

    Stites, C.G.

    1994-01-01

    This Document is the Acceptance Test Procedure for 200 Area C and SY Tank Farm Lighting Upgrade. This Acceptance Test Procedure has been prepared to demonstrate that the Tank Farm Lighting Systems function correctly as required by project criteria and as intended by design

  17. W-087 Acceptance test procedure. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  18. 10 CFR 474.4 - Test procedures.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures. 474.4 Section 474.4 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ELECTRIC AND HYBRID VEHICLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION PROGRAM; PETROLEUM-EQUIVALENT FUEL ECONOMY CALCULATION § 474.4 Test procedures. (a) The electric vehicle energy...

  19. DACS upgrade acceptance test procedure

    International Nuclear Information System (INIS)

    Zuehlke, A.C.

    1994-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the mixer pump, directional drive system, and the instrumentation associated with the SY-101 tank and support systems, and the proper functioning of the DACS with new Model 984-785 Programmable Logic Controllers (PLCs), new MODBUS PLUS version 2.01 software for the PLCs, and version 3.72 of the GENESIS software will be systematically evaluated by performance of this procedure. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tanks. These sensors provide information such as: tank vapor space and ventilation system H 2 concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations

  20. Simulation and Analysis of Converging Shock Wave Test Problems

    Energy Technology Data Exchange (ETDEWEB)

    Ramsey, Scott D. [Los Alamos National Laboratory; Shashkov, Mikhail J. [Los Alamos National Laboratory

    2012-06-21

    Results and analysis pertaining to the simulation of the Guderley converging shock wave test problem (and associated code verification hydrodynamics test problems involving converging shock waves) in the LANL ASC radiation-hydrodynamics code xRAGE are presented. One-dimensional (1D) spherical and two-dimensional (2D) axi-symmetric geometric setups are utilized and evaluated in this study, as is an instantiation of the xRAGE adaptive mesh refinement capability. For the 2D simulations, a 'Surrogate Guderley' test problem is developed and used to obviate subtleties inherent to the true Guderley solution's initialization on a square grid, while still maintaining a high degree of fidelity to the original problem, and minimally straining the general credibility of associated analysis and conclusions.

  1. Magnetometer calibration and test procedure

    International Nuclear Information System (INIS)

    Squier, D.M.

    1997-01-01

    Nuclear waste has been sluiced and pumped from storage tank 241-AX-104, leaving a contaminated heel volume. These operations did not include measurements of the removed waste volume leaving an unknown heel volume in the tank. A magnetometer transducer will be lowered through tank riser ports to rest on the heel's surface. The heel thickness will control the distance between the transducer and the tank's bottom The instrument's output varies with the distance from a magnetic mass, such as the tank's steel bottom, thereby enabling a measurement of the heel depth. Measurements at several tank locations will permit an estimate of the tank's heel volume. The magnetometer's output is influenced by adjacent magnetic materials, such as the tank walls, air lift circulators or other equipment installed in the tank. An adjacent vertical steel surface produces a voltage offset in the instrument's output. Measurements near a tank wall or other tank components may be corrected by noting the offset before the instrument's output is influenced by the tank bottom. An unlevel or uneven heel surface could orient the magnetometer transducer so that it is not vertically level. The magnetometer readings are influenced by these skewed transducer orientations. The magnitude of these errors and offsets must be characterized to bound the heel volume estimate range. The data collected by this activity will be statistically analyzed by SESC to state the confidence level of the heel volume estimates. A test report will document the results of the measurements

  2. Time-dependent diffusive acceleration of test particles at shocks

    Energy Technology Data Exchange (ETDEWEB)

    Drury, L.O' C. (Dublin Inst. for Advanced Studies (Ireland))

    1991-07-15

    The acceleration of test particles at a steady plane non-relativistic shock is considered. Analytic expressions are found for the mean and the variance of the acceleration time distribution in the case where the diffusion coefficient has an arbitrary dependence on position and momentum. These expressions are used as the basis for an approximation scheme which is shown, by comparison with numerical solutions, to give an excellent representation of the time-dependent spectrum. (author).

  3. Time-dependent diffusive acceleration of test particles at shocks

    International Nuclear Information System (INIS)

    Drury, L.O'C.

    1991-01-01

    The acceleration of test particles at a steady plane non-relativistic shock is considered. Analytic expressions are found for the mean and the variance of the acceleration time distribution in the case where the diffusion coefficient has an arbitrary dependence on position and momentum. These expressions are used as the basis for an approximation scheme which is shown, by comparison with numerical solutions, to give an excellent representation of the time-dependent spectrum. (author)

  4. 40 CFR 53.64 - Test procedure: Static fractionator test.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Test procedure: Static fractionator test. 53.64 Section 53.64 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Performance Characteristics of Class II Equivalent Methods for PM2.5 § 53.64 Test procedure: Static...

  5. DOT-7A packaging test procedure

    International Nuclear Information System (INIS)

    Kelly, D.L.

    1995-01-01

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes

  6. Small Optics Laser Damage Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, Justin [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-10-19

    This specification defines the requirements and procedure for laser damage testing of coatings and bare surfaces designated for small optics in the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL).

  7. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    International Nuclear Information System (INIS)

    THOMAS, W.K.

    2000-01-01

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field

  8. The computation of pressure waves in shock tubes by a finite difference procedure

    International Nuclear Information System (INIS)

    Barbaro, M.

    1988-09-01

    A finite difference solution of one-dimensional unsteady isentropic compressible flow equations is presented. The computer program has been tested by solving some cases of the Riemann shock tube problem. Predictions are in good agreement with those presented by other authors. Some inaccuracies may be attributed to the wave smearing consequent of the finite-difference treatment. (author)

  9. Comparison of Shock Response Spectrum for Different Gun Tests

    Directory of Open Access Journals (Sweden)

    J.A. Cordes

    2013-01-01

    Full Text Available The Soft Catch Gun at Picatinny Arsenal is regularly used for component testing. Most shots contain accelerometers which record accelerations as a function of time. Statistics of accelerometer data indicate that the muzzle exit accelerations are, on average, higher than tactical firings. For that reason, Soft Catch Gun tests with unusually high accelerations may not be scored for Lot Acceptance Tests (LAT by some customers. The 95/50 Normal Tolerance Limit (NTL is proposed as a means of determining which test results should be scored. This paper presents comparisons of Shock Response Spectra (SRS used for the 95/50 scoring criteria. The paper also provides a Discussion Section outlining some concerns with scoring LAT results based on test results outside of the proposed 95/50 criteria.

  10. Design and testing of a shock absorber for a type I container

    International Nuclear Information System (INIS)

    Sappok, M.; Beine, B.; Rittscher, D.; Jais, M.

    1994-01-01

    A simple method of designing a shock absorber to protect a type B cast-iron container is developed. The results of deformation tests of the structural material (steel pipes) used for the shock absorber are presented. The accelerations and strains measured during the 9m drop tests of the container with the shock absorber are compared with the theoretical results of the calculations for the shock absorber design. ((orig.))

  11. 16 CFR 1510.4 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedure. 1510.4 Section 1510.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION FEDERAL HAZARDOUS SUBSTANCES ACT REGULATIONS... plane surface. Under its own weight and in a non-compressed state apply any portion of the test sample...

  12. Shock-tunnel combustor testing for hypersonic vehicles

    Science.gov (United States)

    Loomis, Mark P.

    1994-01-01

    Proposed configurations for the next generation of transatmospheric vehicles will rely on air breathing propulsion systems during all or part of their mission. At flight Mach numbers greater than about 7 these engines will operate in the supersonic combustion ramjet mode (scramjet). Ground testing of these engine concepts above Mach 8 requires high pressure, high enthalpy facilities such as shock tunnels and expansion tubes. These impulse, or short duration facilities have test times on the order of a millisecond, requiring high speed instrumentation and data systems. One such facility ideally suited for scramjet testing is the NASA-Ames 16-Inch shock tunnel, which over the last two years has completed a series of tests for the NASP (National Aero-Space Plane) program at simulated flight Mach numbers ranging from 12-16. The focus of the experimental programs consisted of a series of classified tests involving a near-full scale hydrogen fueled scramjet combustor model in the semi-free jet method of engine testing whereby the compressed forebody flow ahead of the cowl inlet is reproduced (see appendix A). The AIMHYE-1 (Ames Integrated Modular Hypersonic Engine) test entry for the NASP program was completed in April 1993, while AIMHYE-2 was completed in May 1994. The test entries were regarded as successful, resulting in some of the first data of its kind on the performance of a near full scale scramjet engine at Mach 12-16. The data was distributed to NASP team members for use in design system verification and development. Due to the classified nature of the hardware and data, the data reports resulting from this work are classified and have been published as part of the NASP literature. However, an unclassified AIAA paper resulted from the work and has been included as appendix A. It contains an overview of the test program and a description of some of the important issues.

  13. Diesel generator trailer acceptance test procedure

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0252 Rev. 1 and ECNs 609271, and 609272. The equipment being tested is a 150KW Diesel Generator mounted on a trailer with switchgear. The unit was purchased as a Design and Fabrication procurement activity. The ATP was written by the Seller and will be performed by the Seller with representatives of the Westinghouse Hanford Company witnessing the test at the Seller's location

  14. Used fuel rail shock and vibration testing options analysis

    Energy Technology Data Exchange (ETDEWEB)

    Ross, Steven B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Best, Ralph E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Klymyshyn, Nicholas A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Jensen, Philip J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Maheras, Steven J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-09-25

    The objective of the rail shock and vibration tests is to complete the framework needed to quantify loads of fuel assembly components that are necessary to guide materials research and establish a technical basis for review organizations such as the U.S. Nuclear Regulatory Commission (NRC). A significant body of experimental and numerical modeling data exists to quantify loads and failure limits applicable to normal conditions of transport (NCT) rail transport, but the data are based on assumptions that can only be verified through experimental testing. The test options presented in this report represent possible paths for acquiring the data that are needed to confirm the assumptions of previous work, validate modeling methods that will be needed for evaluating transported fuel on a case-by-case basis, and inform material test campaigns on the anticipated range of fuel loading. The ultimate goal of this testing is to close all of the existing knowledge gaps related to the loading of used fuel under NCT conditions and inform the experiments and analysis program on specific endpoints for their research. The options include tests that would use an actual railcar, surrogate assemblies, and real or simulated rail transportation casks. The railcar carrying the cradle, cask, and surrogate fuel assembly payload would be moved in a train operating over rail track modified or selected to impart shock and vibration forces that occur during normal rail transportation. Computer modeling would be used to help design surrogates that may be needed for a rail cask, a cask’s internal basket, and a transport cradle. The objective of the design of surrogate components would be to provide a test platform that effectively simulates responses to rail shock and vibration loads that would be exhibited by state-of-the-art rail cask, basket, and/or cradle structures. The computer models would also be used to help determine the placement of instrumentation (accelerometers and strain gauges

  15. Biomonitoring test procedures and biological criteria

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A. [Oak Ridge National Lab., TN (United States); Lipschultz, M.J. [City of Las Vegas, NV (United States); Foster, W.E. [Saint Mary`s Coll., Winona, MN (United States)

    1997-10-01

    The Water Environment Federation recently issued a special publication, Biomonitoring in the Water Environment. In this paper, the authors highlight the contents of the chapter 3, Biomonitoring Test Procedures, identify current trends in test procedures and introduce the concept of biological criteria (biocriteria). The book chapter (and this paper) focuses on freshwater and marine chronic and acute toxicity tests used in the National Pollutant Discharge Elimination System (NPDES) permits program to identify effluents and receiving waters containing toxic materials in acutely or chronically toxic concentrations. The two major categories of toxicity tests include acute tests and chronic tests. The USEPA chronic tests required in NPDEs permits have been shortened to 7 days by focusing on the most sensitive life-cycle stages; these tests are often referred to as short-term chronic tests. The type of test(s) required depend on NPDES permit requirements, objectives of the test, available resources, requirements of the test organisms, and effluent characteristics such as variability in flow or toxicity. The permit writer will determine the requirements for toxicity test(s) by considering such factors as dilution, effluent variability, and exposure variability. Whether the required test is acute or chronic, the objective of the test is to estimate the safe or no effect concentration which is defined as the concentration which will permit normal propagation of fish and other aquatic life in the receiving waters. In this paper, the authors review the types of toxicity tests, the commonly used test organisms, and the uses of toxicity test data. In addition, they briefly describe research on new methods and the use of biological criteria.

  16. Portal monitor evaluation and test procedure

    International Nuclear Information System (INIS)

    Johnson, L.O.; Gupta, V.P.; Stevenson, R.L.; Rich, B.L.

    1983-10-01

    The purpose was to develop techniques and procedures to allow users to measure performance and sensitivity of portal monitors. Additionally, a methodology was developed to assist users in optimizing monitor performance. The two monitors tested utilized thin-window gas-flow proportional counters sensitive to beta and gamma radiation. Various tests were performed: a) background count rate and the statistical variability, b) detector efficiency at different distances, c) moving source sensitivity for various size sources and speeds, and d) false alarm rates at different background levels. A model was developed for the moving source measurements to compare the experimental data with measured results, and to test whether it is possible to adequately model the behavior of a portal monitor's response to a moving source. The model results were compared with the actual test results. A procedure for testing portal monitors is also given. 1 reference, 9 figures, 8 tables

  17. Parametric Sensitivity Tests- European PEM Fuel Cell Stack Test Procedures

    DEFF Research Database (Denmark)

    Araya, Samuel Simon; Andreasen, Søren Juhl; Kær, Søren Knudsen

    2014-01-01

    performed based on test procedures proposed by a European project, Stack-Test. The sensitivity of a Nafion-based low temperature PEMFC stack’s performance to parametric changes was the main objective of the tests. Four crucial parameters for fuel cell operation were chosen; relative humidity, temperature......As fuel cells are increasingly commercialized for various applications, harmonized and industry-relevant test procedures are necessary to benchmark tests and to ensure comparability of stack performance results from different parties. This paper reports the results of parametric sensitivity tests......, pressure, and stoichiometry at varying current density. Furthermore, procedures for polarization curve recording were also tested both in ascending and descending current directions....

  18. 40 CFR 53.43 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... sampling zone (see § 53.42(d)). To meet the maximum blockage limit of § 53.42(a) or for convenience, part... PM10 § 53.43 Test procedures. (a) Sampling effectiveness—(1) Technical definition. The ratio (expressed... evenly spaced isokinetic samplers in the sampling zone (see § 53.42(d)) of the wind tunnel. Collect...

  19. Military Publications, Index of Test Operations Procedures

    Science.gov (United States)

    1981-10-01

    serial number, aad design information for majur components. Prescribes vehicle, major component, and system descrip- tive elements required; such as...mount operating characteristics. Discusses preparation for test, instrumentation, and facil- ities. Describes procedures for force measurement, carriage...backlash and accuracy, turret friction, gun balance, manual handcrank force , manual response ratio, weapon and sighting system backlash, power controller

  20. Thermal shock test of TiC and graphite

    International Nuclear Information System (INIS)

    Shirakawa, H.; Okamura, J.; Son, P.; Miyake, M.

    1989-01-01

    Thermal shock tests were performed by pulse electron beam heating on chemically vapor deposited coatings of TiC on Poco graphite, bulk TiC, and several kinds of isotropic graphite. The specimens were heated at various power densities (10-45 MW/m 2 ) for various pulse durations (1-2 s) to examine the dependence of thermal failures on heating conditions. The TiC coating on graphite suffered cracking, surface melting and evaporation by the thermal pulse. The surface melting limit, defined as F τ 1/2 , where F is the minimum power density that causes surface melting for a specified pulse duration τ, was approximately 48 MWs 1/2 /m 2 for the TiC coating. The combined-Carbon/Titanium ratio of the coating after electron beam heating decreased with increasing power density and pulse duration. The bulk TiC specimens were so brittle that they fractured at heat load conditions where the coating showed no damage. The graphite specimens showed sublimation as a principal damage mechanism by the thermal pulse, and the sublimation weight loss decreased with increasing the thermal conductivity of the specimen. It was confirmed that the TiC coating on graphite had favorable resistance to thermal shock as compared to the bulk TiC and that graphite with high thermal conductivity is promising material as a high heat flux component. (orig.)

  1. Evaluation of Defects of Thermal Barrier Coatings by Thermal Shock Test Using Eddy Current Testing

    Energy Technology Data Exchange (ETDEWEB)

    Heo, Tae Hoon; Cho, Youn Ho; Lee, Joon Hyun [Pusan National University, Busan (Korea, Republic of); Oh, Jeong Seok; Lee, Koo Hyun [KIMM, Daejeon (Korea, Republic of)

    2009-10-15

    Periodical thermal shock can introduce defects in thermal barrier coating made by layers of CoNiCrAlY bond coating(BC) and ZrO{sub 2}-8wt%Y{sub 2}O{sub 3} ceramic top coating(TC) on Inconel-738 substrate using plasma spraying. Thermal shock test is performed by severe condition that is to heat until 1000 .deg. C and cool until 20 .deg. C. As the number of cycle is increased, the fatigue by thermal shock is also increased. After test, the micro-structures and mechanical characteristics of thermal barrier coating were investigated by SEM, XRD. The TGO layer of is Al{sub 2}O{sub 3} formed between BC and TC by periodical thermal shock test, and its change in thickness is inspected by eddy current test(ECT). By ECT test, it is shown that TGO and micro-crack can be detected and it is possible to predict the life of thermal barrier coating

  2. Acceptance test procedure for core sample trucks

    International Nuclear Information System (INIS)

    Smalley, J.L.

    1995-01-01

    The purpose of this Acceptance Test Procedure is to provide instruction and documentation for acceptance testing of the rotary mode core sample trucks, HO-68K-4600 and HO-68K-4647. The rotary mode core sample trucks were based upon the design of the second core sample truck (HO-68K-4345) which was constructed to implement rotary mode sampling of the waste tanks at Hanford. Acceptance testing of the rotary mode core sample trucks will verify that the design requirements have been met. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Compressed air will be substituted for nitrogen during the majority of testing, with nitrogen being used only for flow characterization

  3. Testing the Asymmetry of Shocks with Euro Area

    Directory of Open Access Journals (Sweden)

    Marius-Corneliu MARINAŞ

    2012-01-01

    Full Text Available The objective of this study is to identify the demand and supply shocks affecting 13 EU member states and to estimate their degree of correlation with the Euro area shocks. This research ensures identifying the asymmetry of shocks degree with the monetary union, depending on which it’s judging the desirability of adopting a single currency. The analysis is also useful for the economies outside the Euro area, because they are strongly commercial and financial integrated especially with the core economies from union. Applying the Blanchard and Quah methodology to estimate the shocks in the period from 1998:1- 2010:3, I have found a weak and negative correlation between demand shocks and a medium to high correlation of the supply shocks. The results obtained suggest the presence of a structural convergence process with the Euro area, in the context of domestic macroeconomic policies rather different, both inside and outside the monetary union.

  4. 118-B-1 excavation treatability test procedures

    International Nuclear Information System (INIS)

    Frain, J.M.

    1994-01-01

    This treatability study has two purposes: to support development of the approach to be used for burial ground remediation, and to provide specific engineering information for the design of burial grounds receiving waste generated from the 100 Area removal actions. Data generated from this test will also provide performance and cost information necessary for detailed analysis of alternatives for burial ground remediation. Further details on the test requirements, milestones and data quality objectives are described in detail in the 118-B-1 Excavation Treatability Test Plan (DOE/RL-94-43). These working procedures are intended for use by field personnel to implement the requirements of the milestone. A copy of the detailed Test Plan will be kept on file at the on-site field support trailer, and will be available for review by field personnel

  5. Thermal shock testing of ceramics with pulsed laser irradiation

    International Nuclear Information System (INIS)

    Benz, R.; Naoumidis, A.; Nickel, H.

    1986-04-01

    Arguments are presented showing that the resistance to thermal stressing (''thermal shock'') under pulsed thermal energy deposition by various kinds of beam irradiations is approximately proportional to Φ a √tp, where Φ a is the absorbed power density and tp is the pulse length, under conditions of diffusivity controlled spreading of heat. In practical beam irradiation testing, incident power density, Φ, is reported. To evaluate the usefulness of Φ√tp as an approximation to Φ a √tp, damage threshold values are reviewed for different kinds of beams (electron, proton, and laser) for a range of tp values 5x10 -6 to 2 s. Ruby laser beam irradiation tests were made on the following ceramics: AlN, BN, graphite, αSiC, β-SiC coated graphites, (α+β)Si 3 N 4 , CVD (chemical vapor deposition) TiC coated graphite, CVD TiC coated Mo, and CVD TiN coated IN 625. The identified failure mechanisms are: 1. plastic flow followed by tensile and bend fracturing, 2. chemical decomposition, 3. melting, and 4. loss by thermal spallation. In view of the theoretical approximations and the neglect of reflection losses there is reasonable accord between the damage threshold Φ√tp values from the laser, electron, and proton beam tests. (orig./IHOE)

  6. Procedure guideline for radioiodine test (version 3)

    International Nuclear Information System (INIS)

    Dietlein, M.; Schicha, H.; Eschner, W.; Deutsche Gesellschaft fuer Medizinische Physik; Koeln Univ.; Lassmann, M.; Deutsche Gesellschaft fuer Medizinische Physik; Wuerzburg Univ.; Leisner, B.; Allgemeines Krankenhaus St. Georg, Hamburg; Reiners, C.; Wuerzburg Univ.

    2007-01-01

    The version 3 of the procedure guideline for radioiodine test is an update of the guideline previously published in 2003. The procedure guideline discusses the pros and cons of a single measurement or of repeated measurements of the iodine-131 uptake and their optimal timing. Different formulas are described when one, two or three values of the radioiodine kinetic are available. The probe with a sodium-iodine crystal, alternatively or additionally the gamma camera using the ROI-technique are instrumentations for the measurement of iodine-131 uptake. A possible source of error is an inappropriate measurement (sonography) of the target volume. The patients' preparation includes the withdrawal of antithyroid drugs 2-3 days before radioiodine administration. The patient has to avoid iodine-containing medication and the possibility of additives of iodine in vitamin- and electrolyte-supplementation has to be considered. (orig.)

  7. Shaft shock absorber tests for a spent fuel canister

    International Nuclear Information System (INIS)

    Kukkola, T.; Toermaelae, V.P.

    2005-06-01

    The disposal canister for spent nuclear fuel will be transferred by a lift to the repository, which is 500 m deep in the bedrock. Model tests were carried out with the objective to estimate weather feasible shock absorber can be developed against the design accident case where the canister should survive a free fall to the lift shaft. If the velocity of the canister is not controlled by air drag or by any other deceleration means, the impact velocity may reach ultimate speed of 100m/s. The canister would retain its integrity in impact on water when the bottom pit of the lift well is filled with groundwater. However, the canister would hit the pit bottom with high velocity since the water hardly slows down the canister. The impact to the bottom of the pit should be dampened mechanically. The tests demonstrated that 20 m high filling to the bottom pit of the lift well by Light Expanded Clay Aggregate (LECA), gives fair impact absorption to protect the fuel canister. Presence of ground water is not harmful for impact absorption system provided that the ceramic gravel is not floating too high from the pit bottom. Almost ideal impact absorption conditions are met if the water high level does not exceed two thirds of the height of the gravel. Shaping of the bottom head of the cylindrical canister does not give meaningful advantages to the impact absorption system. The flat nose bottom head of the fuel canister gives adequate deceleration properties. (orig.)

  8. Dispersant testing : a study on analytical test procedures

    International Nuclear Information System (INIS)

    Fingas, M.F.; Fieldhouse, B.; Wang, Z.; Environment Canada, Ottawa, ON

    2004-01-01

    Crude oil is a complex mixture of hydrocarbons, ranging from small, volatile compounds to very large, non-volatile compounds. Analysis of the dispersed oil is crucial. This paper described Environment Canada's ongoing studies on various traits of dispersants. In particular, it describes small studies related to dispersant effectiveness and methods to improve analytical procedures. The study also re-evaluated the analytical procedure for the Swirling Flask Test, which is now part of the ASTM standard procedure. There are new and improved methods for analyzing oil-in-water using gas chromatography (GC). The methods could be further enhanced by integrating the entire chromatogram rather than just peaks. This would result in a decrease in maximum variation from 5 per cent to about 2 per cent. For oil-dispersant studies, the surfactant-dispersed oil hydrocarbons consist of two parts: GC-resolved hydrocarbons and GC-unresolved hydrocarbons. This study also tested a second feature of the Swirling Flask Test in which the side spout was tested and compared with a new vessel with a septum port instead of a side spout. This decreased the variability as well as the energy and mixing in the vessel. Rather than being a variation of the Swirling Flask Test, it was suggested that a spoutless vessel might be considered as a completely separate test. 7 refs., 2 tabs., 4 figs

  9. Some Remarks on Foundation Pile Testing Procedures

    Science.gov (United States)

    Rybak, Jarosław

    2017-10-01

    This work presents the review of pile capacity testing techniques. In an overview, the key points in pile designing are: determination of the appropriate computational schemes, reliable data on loads and the properties of structural materials (in particular, of the soil mass, which is marked by the greatest variability). The procedure of constructing a pile foundation should include: carrying out soil tests in the scope that ensures safe designing, selecting a piling technology that is relevant both to geotechnical conditions and expected loads, drafting a piling design together with the design of load tests, setting up a testing station for further load tests, static and/or dynamic tests of pile load capacity, preceded by supplementary soil tests when the conditions of test pile installation fail to comply with the design assumptions or when the pile length exceeds the depth of the previously investigated soil, making documentation of load capacity tests (with an additional correction of the piling design), the actual piling (ongoing analysis of pile driving logs and, if necessary, testing the piles’ integrity), drawing up the as-built documentation. Unfortunately, the design is corrected after the load test have been conducted only if the piles fail to show the designed bearing capacity. The designer is then obliged to revise the design assumptions on the basis of tests results. If the test results account for the a greater bearing capacity than necessary and it would be recommendable to limit the extent of the planned (i.e. set out in the contract) piling works, usually neither the contractor nor the designer, nor even the Construction Site Supervisor, acting for the benefit of the Investor, are willing to take on the responsibility for reducing the scope of the piling works. The necessity of conducting additional control tests before and during the implementation of the construction project is often treated by the investors as an attempt at extorting extra

  10. Radioisotope Thermoelectric Generator Transporation System licensed hardware second certification test series and package shock mount system test

    International Nuclear Information System (INIS)

    Ferrell, P.C.; Moody, D.A.

    1995-10-01

    This paper presents a summary of two separate drop test a e performed in support of the Radioisotope Thermoelectric Generator (RTG) Transportation System (RTGTS). The first portion of this paper presents the second series of drop testing required to demonstrate that the RTG package design meets the requirements of Title 10, Code of Federal Regulations, ''Part 71'' (10 CFR 71). Results of the first test series, performed in July 1994, demonstrated that some design changes were necessary. The package design was modified to improve test performance and the design changes were incorporated into the Safety Analysis Report for Packaging (SARP). The second full-size certification test article (CTA-2) incorporated the modified design and was tested at the US Department of Energy's (DOE) Hanford Site near Richland, Washington. With the successful completion of the test series, and pending DOE Office of Facility Safety Analysis approval of the SARP, a certificate of compliance will be issued for the RTG package allowing its use. The second portion of this paper presents the design and testing of the RTG Package Mount System. The RTG package mount was designed to protect the RTG from excessive vibration during transport, provide shock protection during on/off loading, and provide a mechanism for moving the RTG package with a forklift. Military Standard (MIL-STD) 810E, Transit Drop Procedure (DOE 1989), was used to verify that the shock limiting system limited accelerations in excess of 15 G's at frequencies below 150 Hz. Results of the package mount drop tests indicate that an impact force of 15 G's was not exceeded in any test from a free drop height of 457 mm (18 in.)

  11. Hydrogen-Helium shock Radiation tests for Saturn Entry Probes

    Science.gov (United States)

    Cruden, Brett A.

    2016-01-01

    This paper describes the measurement of shock layer radiation in Hydrogen/Helium mixtures representative of that encountered by probes entering the Saturn atmosphere. Normal shock waves are measured in Hydrogen-Helium mixtures (89:11% by volume) at freestream pressures between 13-66 Pa (0.1-0.5 Torr) and velocities from 20-30 km/s. Radiance is quantified from the Vacuum Ultraviolet through Near Infrared. An induction time of several centimeters is observed where electron density and radiance remain well below equilibrium. Radiance is observed in front of the shock layer, the characteristics of which match the expected diffusion length of Hydrogen.

  12. INERT Atmosphere confinement operability test procedure

    International Nuclear Information System (INIS)

    RISENMAY, H.R.

    1999-01-01

    This Operability Test Procedure (OTP) provides instructions for testing operability of the Inert Atmosphere Confinement (IAC). The Inert Atmosphere Confinement was designed and built for opening cans of metal items that might have hydrided surfaces. Unreviewed Safety Question (USQ) PFP-97-005 addresses the discovery of suspected plutonium hydride forming on plutonium metal currently stored in the Plutonium Finishing Plant vaults. Plutonium hydride reacts quickly with air, liberating energy. The Inert Atmosphere Confinement was designed to prevent this sudden liberation of energy by opening the material in an inert argon atmosphere instead of the normal glovebox atmosphere. The IAC is located in glovebox HC-21A, room 230B of the 234-5Z Building at the Plutonium Finishing Plant (PFP) in the 200-West Area of the Hanford Site

  13. WSEAT Shock Testing Margin Assessment Using Energy Spectra Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Sisemore, Carl; Babuska, Vit; Booher, Jason

    2018-02-01

    Several programs at Sandia National Laboratories have adopted energy spectra as a metric to relate the severity of mechanical insults to structural capacity. The purpose being to gain insight into the system's capability, reliability, and to quantify the ultimate margin between the normal operating envelope and the likely system failure point -- a system margin assessment. The fundamental concern with the use of energy metrics was that the applicability domain and implementation details were not completely defined for many problems of interest. The goal of this WSEAT project was to examine that domain of applicability and work out the necessary implementation details. The goal of this project was to provide experimental validation for the energy spectra based methods in the context of margin assessment as they relate to shock environments. The extensive test results concluded that failure predictions using energy methods did not agree with failure predictions using S-N data. As a result, a modification to the energy methods was developed following the form of Basquin's equation to incorporate the power law exponent for fatigue damage. This update to the energy-based framework brings the energy based metrics into agreement with experimental data and historical S-N data.

  14. Operator coil monitoring Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Erhart, M.F.

    1995-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software's ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ''ENABLE'' and ''DISABLE'' controls from the Master and RSS stations function correctly, and only with the use of proper passwords

  15. Drop Hammer Tests with Three Oleo Strut Models and Three Different Shock Strut Oils at Low Temperatures

    Science.gov (United States)

    Kranz, M

    1954-01-01

    Drop hammer tests with different shock strut models and shock strut oils were performed at temperatures ranging to -40 C. The various shock strut models do not differ essentially regarding their springing and damping properties at low temperatures; however, the influence of the different shock strut oils on the springing properties at low temperatures varies greatly.

  16. TMACS test procedure TP009: Acromag driver. Revision 5

    International Nuclear Information System (INIS)

    Bass, R.B.; Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the testing of the functionality of the TMACS Acromag driver software in conjunction with a new bridge for the Panalarm Annunciator system

  17. TMACS Test Procedure TP008: SACS Interface. Revision 5

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS SACS Interface functions

  18. TMACS Test Procedure TP010: Integration summary. Revision 5

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The TMACS Soft Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes

  19. Shaft shock absorber tests for a spent fuel canister

    International Nuclear Information System (INIS)

    Kukkola, T.; Toermaelae, V.P.

    2003-01-01

    The holding canister for spent nuclear fuel will be transferred by a lift to the final disposal tunnels 500m deep in the bedrock. Model tests were carried out with an objective to estimate weather feasible shock absorbing properties can be met in a design accident case where the canister should survive a free fall due to e.g. sabotage. If the velocity of the canister is not controlled by air drag or any other deceleration means, the impact velocity may reach ultimate speed of 100m/s. The canister would retain its integrity when stricken by the surface penetration impact if the bottom pit of the lift well would be filled with groundwater. However the canister would hit the pit bottom with high velocity since the water hardly slows down the canister. The impact to the bottom of the pit should be dampened mechanically. The tests demonstrated that 20m high filling to the bottom pit of the lift well by ceramic gravel, trade mark LECA-sora, gives a fair impact absorption to protect the spent fuel canister. Presence of ground water is not harmful for impact absorption system provided that the ceramic gravel is not floating too high from the pit bottom. Almost ideal impact absorption conditions are met if the water high level does not exceed two thirds of the height of the gravel. Shaping of the bottom head of the cylindrical canister does not give meaningful advantages to the impact absorption system. The flat nose bottom head of the fuel canister gives adequate deceleration properties. (orig.)

  20. Laboratory procedures for waste form testing

    International Nuclear Information System (INIS)

    Mast, E.S.

    1994-01-01

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory

  1. Laboratory procedures for waste form testing

    Energy Technology Data Exchange (ETDEWEB)

    Mast, E.S.

    1994-09-19

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory.

  2. Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer

    International Nuclear Information System (INIS)

    Aftanas, B.L.

    1994-01-01

    This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101-SY pump. This procedure includes: safety check and safety procedures; pre-operation check out; startup; leveling trailer; functional/proofload test; proofload testing; and rolling load test

  3. TMACS test procedure TP010: Integration summary. Revision 6

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure verifies that Test Procedures 1, 2, 3, 5 and 9 (WHC-SD-WM-TRP-105, 106, 107, 109 and 113) of TMACS Software Release 4.1 have been successfully completed

  4. Thermal shock tests to qualify different tungsten grades as plasma facing material

    Science.gov (United States)

    Wirtz, M.; Linke, J.; Loewenhoff, Th; Pintsuk, G.; Uytdenhouwen, I.

    2016-02-01

    The electron beam device JUDITH 1 was used to establish a testing procedure for the qualification of tungsten as plasma facing material. Absorbed power densities of 0.19 and 0.38 GW m-2 for an edge localized mode-like pulse duration of 1 ms were chosen. Furthermore, base temperatures of room temperature, 400 °C and 1000 °C allow investigating the thermal shock performance in the brittle, ductile and high temperature regime. Finally, applying 100 pulses under all mentioned conditions helps qualifying the general damage behaviour while with 1000 pulses for the higher power density the influence of thermal fatigue is addressed. The investigated reference material is a tungsten product produced according to the ITER material specifications. The obtained results provide a general overview of the damage behaviour with quantified damage characteristics and thresholds. In particular, it is shown that the damage strongly depends on the microstructure and related thermo-mechanical properties.

  5. Context-dependent effects of hippocampal damage on memory in the shock-probe test.

    Science.gov (United States)

    Lehmann, Hugo; Carfagnini, Adrienne; Yamin, Stephanie; Mumby, Dave G

    2005-01-01

    We assessed the role of the hippocampus in anterograde memory, using the shock-probe test. Rats with sham or neurotoxic lesions of the hippocampus were given a shock-probe acquisition session during which each time they contacted a probe they received a shock; 24 h later, the rats were given a second shock-probe session to test their retention, but in this instance the probe was not electrified. Rats were tested in either the same context as the one used during acquisition or in a different context. The hippocampal lesions impaired avoidance of the probe and burying on the retention test, suggesting that the lesions induced anterograde amnesia. However, the impairment was context dependent. The hippocampal lesions impaired avoidance only when the rats were tested in the context in which they received the conditioning. The results of the shock-probe test suggest that the anterograde amnesia following hippocampal lesions is due mainly to an inability to associate the context with the shock more than to an inability to associate the probe with shock. Copyright (c) 2004 Wiley-Liss, Inc.

  6. Rippled shock front solutions for testing hydrodynamic stability simulations

    International Nuclear Information System (INIS)

    Munro, D.H.

    1989-01-01

    The response of a shock front to arbitrary small perturbations can be calculated analytically. Such rippled shock front solutions are useful for determining the accuracy of hydrodynamic simulation codes such as LASNEX [Comments Plasma Phys. Controlled Fusion 2, 51 (1977)], which are used to compute perturbation growth in inertial fusion targets. The LASNEX fractional errors are of order κ 2 L 2 , where κ is the transverse wavenumber of the perturbation, and L is the largest zone dimension. Numerical errors are about 25% for a calculation using 26 zones per transverse wavelength

  7. Antimicrobial Testing Methods & Procedures Developed by EPA's Microbiology Laboratory

    Science.gov (United States)

    We develop antimicrobial testing methods and standard operating procedures to measure the effectiveness of hard surface disinfectants against a variety of microorganisms. Find methods and procedures for antimicrobial testing.

  8. Enraf Series 854 advanced technology gauge (ATG) acceptance test procedure

    International Nuclear Information System (INIS)

    Huber, J.H.

    1996-01-01

    This Acceptance Test Procedure was written to test the Enraf Series 854 Advanced Technology Gauge (ATG) prior to installation in the Tank Farms. The procedure sets various parameters and verifies that the gauge is functional

  9. Noncoplanar magnetic fields at collisionless shocks: A test of a new approach

    International Nuclear Information System (INIS)

    Gosling, J.T.; Winske, D.; Thomsen, M.F.

    1988-01-01

    Within the foot and ramp of a fast mode collisionless shock the magnetic field rotates out of the plane of coplanarity defined by the upstream magnetic field and the shock normal. As previously noted (Goodrich and Scudder, 1984), the sense of this rotation is such as to reduce the cross-shock potential drop when measured in the deHoffman-Teller frame relative to that measured in the normal incidence frame. From a consideration of the requirement that there be zero current in the coplanarity plane downstream of the shock, Jones and Ellison (1987) have argued that the field rotation and potential drop difference are a consequence of unequal ion and electron masses, and have derived an expression for the spatial integral of the noncoplanar field component in terms of the electron current within the shock layer. Moreover, by assuming that the ion current within the shock layer is negligible compared to the electron current, they derive equations which predict the magnitude of both the field rotation and the potential drop difference in terms of upstream quantities and the field jump at the shock. We have tested their equations with ISEE 1 and 2 plasma and field measurements at the Earth's bow shock and by means of numerical simulations. We find substantial support for their suggestion that the field rotation and thus also the frame dependence of the potential drop are fundamentally a consequence of unequal ion and electron masses. Further, for subcritical shocks (low Mach number) one can neglect the ion current to predict both the sign and the magnitude of the field rotation and potential drop difference. However, at supercritical shocks (high Mach numbers) the ion current associated with reflected, gyrating ions cannot be neglected, and the final equations of Jones and Ellison seriously underestimate the magnitude of the field rotation and the potential drop difference at these shocks

  10. Development and Realization of a Shock Wave Test on Expert Flap Qualification Model

    Science.gov (United States)

    De Fruytier, C.; Dell'Orco, F.; Ullio, R.; Gomiero, F.

    2012-07-01

    This paper presents the methodology and the results of the shock test campaign conducted by TAS-I and TAS ETCA to qualify the EXPERT Flap in regards of shock wave and acoustic load generated by pyrocord detonation at stages 2/3 separation phase of the EXPERT vehicle. The design concept of the open flap (manufactured by MT AEROSPACE) is a fully integral manufactured, four sided control surface, with an additional stiffening rib and flanges to meet the first eigenfrequency and the allowable deformation requirement with a minimum necessary mass. The objectives were to reproduce equivalent loading at test article level in terms of pulse duration, front pressure, front velocity and acoustic emission. The Thales Alenia Space ETCA pyrotechnic shock test device is usually used to produce high level shocks by performing a shock on a test fixture supporting the unit under test. In this case, the facility has been used to produce a shock wave, with different requested physical characteristics, directed to the unit under test. Different configurations have been tried on a dummy of the unit to test, following an empirical process. This unusual work has lead to the definition of a nominal set- up meeting the requested physical parameters. Two blast sensors have been placed to acquire the pressure around the flap. The distance between the two sensors has allowed estimating the front pressure velocity. Then, several locations have been selected to acquire the acceleration responses on the unit when it was submitted to this environment. Additionally, a “standard” shock test has been performed on this model. The qualification of the flap, in regards of shock environment, has been successfully conducted.

  11. Thermal shock testing of TiC-coated molybdenum with pulsed hydrogen beams

    International Nuclear Information System (INIS)

    Nakamura, Kazuyuki

    1985-07-01

    Thermal shock testing of molybdenum samples, on which TiC is coated by TP-CVD and CVD methods, has been made by using a pulsed hydrogen beam. The power density applied was 2 kw/cm 2 . The test results showed that TiC coatings did not exfoliate until the melting of the substrate and showed good adhesion under the thermal shock condition. (author)

  12. High shock load testing of lithium-thionyl chloride batteries

    Energy Technology Data Exchange (ETDEWEB)

    Epstein, J.; Marincic, N.

    1983-10-01

    Low rate cylindrical cells have been developed, capable of withstanding mechanical shocks up to 23,000 g's for one millisecond. The cells were based on the lithium-thionyl chloride battery system and totally hermetic stainless steel hardware incorporating a glass sealed positive terminal. Four cells in series were required to deliver 25 mA pulses at a minimum voltage of 10 V before and after such exposure to one mechanical shock. Batteries were contained in a hardened steel housing and mounted within a projectile accelerated by means of a gas gun. The velocity of the projectile was measured with electronic probes immediately before impact and the deceleration was effected using a special aluminum honeycomb structure from which the g values were calculated. A high survival rate for the cells was achieved in spite of some mechanical damage to the battery housing still present.

  13. GMS/DACS interface acceptance test procedure

    International Nuclear Information System (INIS)

    Zuehlke, A.C.

    1994-01-01

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring of existing, and newly installed, instrumentation associated with the SY-101 tank Gas Monitoring Systems will be systematically evaluated by performance of this procedure. All new alarms will be verified to function at the required setpoints. The change of I/O Drop 17 to I/O Drop 13 will be checked to verify that all associated alarms and screen displays are correct. All new or changed Control Screens which provide operator interface with the Gas Monitoring Systems readouts during operations will be verified to be adequate and correct. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tank. These sensors provide information such as: tank vapor space and ventilation system H 2 concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations. The portions of the system to be tested include: new RGA5 gas monitor; existing gas chromatographs; FTIR; B ampersand K (Photo) NH 3 equipment; any new or changed Genesis screens; and I/O Drop 13

  14. TMACS test procedure TP003: Graphics. Revision 5

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays

  15. TMACS test procedure TP001: Alarm management. Revision 6

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the Alarm Management requirements of the TMACS. The features to be tested are: real-time alarming on high and low level and discrete alarms, equipment alarms, dead-band filtering, alarm display color coding, alarm acknowledgement, and alarm logging

  16. TMACS test procedure TP003: Graphics. Revision 6

    International Nuclear Information System (INIS)

    Scanlan, P.K.; Washburn, S.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays

  17. 702AZ aging waste ventilation facility year 2000 test procedure

    International Nuclear Information System (INIS)

    Winkelman, W.D.

    1998-01-01

    This test procedure was developed to determine if the 702AZ Tank Ventilation Facility system is Year 2000 Compliant. The procedure provides detailed instructions for performing the operations necessary and documenting the results. This verification procedure will document that the 702AZ Facility Systems are year 2000 compliant and will correctly meet the criteria established in this procedure

  18. Design and testing of a magnetorheological damper to control both vibration and shock loads for a vehicle crew seat

    Science.gov (United States)

    Becnel, Andrew; Hu, Wei; Hiemenz, Gregory J.; Wereley, Norman M.

    2010-04-01

    A magnetorheological shock absorber (MRSA) prototype is designed, fabricated and tested to integrate semiactive shock and vibration mitigation technology into the existing Expeditionary Fighting Vehicle (EFV) forward seating positions. Utilizing Bingham-Plastic (BP) constitutive fluid relationships and a steady state fluid flow model, the MR valve parameters are determined using magnetic circuit analysis, and subsequently validated via electromagnetic finite element analysis (FEA). Low speed (up to 0.9 m/s) simulations of normal vibration mode operation are conducted on the MRSA prototype using single frequency sinusoidal displacements by a servohydraulic testing machine. The high speed (up to 2.2 m/s) design procedure is verified by using a rail-guided drop test stand to impact a known payload mass onto the damper shaft. A refined hydromechanical model of the MRSA under both cyclic and impact loadings is developed and validated using the measured test data. This ratedependent, mechanisms-based model predicts the time response of the MRSA under both loading conditions. The hydromechanical analysis marks a significant improvement over previous linear models. Key design considerations for the MRSA to accommodate both vibration and shock spectra using a single MR device are presented.

  19. 40 CFR 89.406 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures. 89.406 Section 89.406 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...

  20. Cloud-based Electronic Test Procedures, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Test procedures are at the heart of any experimental process, especially those involving novel and complex hardware. Whether these procedures are for system...

  1. Development of an accelerated creep testing procedure for geosynthetics.

    Science.gov (United States)

    1997-09-01

    The report presents a procedure for predicting creep strains of geosynthetics using creep tests at elevated temperatures. Creep testing equipment was constructed and tests were performed on two types of geosynthetics: High Density Polyethylene (HDPE)...

  2. Analysis and optimization of blood-testing procedures.

    NARCIS (Netherlands)

    Bar-Lev, S.K.; Boxma, O.J.; Perry, D.; Vastazos, L.P.

    2017-01-01

    This paper is devoted to the performance analysis and optimization of blood testing procedures. We present a queueing model of two queues in series, representing the two stages of a blood-testing procedure. Service (testing) in stage 1 is performed in batches, whereas it is done individually in

  3. Test procedure for boxed waste assay system

    International Nuclear Information System (INIS)

    Wachter, J.

    1994-01-01

    This document, prepared by Los Alamos National Laboratory's NMT-4 group, details the test methodology and requirements for Acceptance/Qualification testing of a Boxed Waste Assay System (BWAS) designed and constructed by Pajarito Scientific Corporation. Testing of the BWAS at the Plutonium Facility (TA55) at Los Alamos National Laboratory will be performed to ascertain system adherence to procurement specification requirements. The test program shall include demonstration of conveyor handling capabilities, gamma ray energy analysis, and imaging passive/active neutron accuracy and sensitivity. Integral to these functions is the system's embedded operating and data reduction software

  4. TMACS test procedure TP012: Panalarm software bridge

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    This Test Procedure addresses the testing of the functionality of the Tank Monitor and Control System (TMACS) Panalarm bridge software. The features to be tested are: Bridge Initialization Options; Bridge Communication; Bridge Performance; Testing Checksum Errors; and Testing Command Reject Errors. Only the first three could be tested; the last two have been deferred to a later date

  5. Shock and vibration tests of uranium mononitride fuel pellets for a space power nuclear reactor

    Science.gov (United States)

    Adams, D. W.

    1972-01-01

    Shock and vibration tests were conducted on cylindrically shaped, depleted, uranium mononitride (UN) fuel pellets. The structural capabilities of the pellets were determined under exposure to shock and vibration loading which a nuclear reactor may encounter during launching into space. Various combinations of diametral and axial clearances between the pellets and their enclosing structures were tested. The results of these tests indicate that for present fabrication of UN pellets, a diametral clearance of 0.254 millimeter and an axial clearance of 0.025 millimeter are tolerable when subjected to launch-induced loads.

  6. 16 CFR 1610.6 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ... dimension of the specimen and arranged so the test flame impinges on a metallic thread. (iv) Embroidery. Embroidery on netting material shall be tested with two sets of preliminary specimens to determine the most flammable area (which offers the greatest amount of netting or embroidery in the 150 mm (6 in.) direction...

  7. Some procedures for computerized ability testing

    NARCIS (Netherlands)

    van der Linden, Willem J.; Zwarts, Michel A.

    1989-01-01

    For computerized test systems to be operational, the use of item response theory is a prerequisite. As opposed to classical test theory, in item response models the abilities of the examinees and the properties of the items are parameterized separately. Hence, when measuring the abilities of

  8. 16 CFR 1630.4 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ...) Test chamber. The test chamber shall consist of an open top hollow cube made of noncombustible material...) Gloves. Nonhygroscopic gloves (such as rubber polyethylene) for handling the sample after drying, and... in the draft-protected environment (hood with draft off) with its bottom in place. Wearing gloves...

  9. Design and testing of a shock absorber for a type 1 container

    International Nuclear Information System (INIS)

    Sappok, M.; Beine, B.; Rittscher, D.

    1993-01-01

    A shock-absorber will be required for a rad. waste 'Konrad' type 1 container made of ductile cast iron whenever it will be used as a type B container according to the IAEA-Regulations for the Safe Transport of Radioactive materials. The shock-absorber has to protect the type B container during shipping such as to withstand the accident scenarios that are covered by the IAEA-Regulation tests without substantial loss of its shielding and tightness functions. The designation as type 1 container originates from German regulations for the intermediate storage site Gorleben and the final depository Konrad-mine. These regulations call for the limits on outside dimensions of 1700 mm in length, 1600 mm in width and 1450 mm in height as well as for a limit of 20 Mg on total weight without shock-absorber. The relatively simple design method for the shock-absorber has been validated by the test results. It can be extended to other materials and designs for shock-absorbers if reliable force-displacement-diagrams are available for the structural elements from which the absorbed energy and the displacements can be calculated by integration. In order to account for the dynamic effects, the better approximation of the true duration of the impact would be helpful. The present limit of 0.5 R p0,2 on the nominal stresses should be discussed because the large number of tests on containers made of ductile cast iron that have been performed up to now have shown a substantial level of conservatism on this respect. The sharply tapered pipes on edge Kl of the shock-absorbers should be replaced by pipe bends. This will result in smaller accelerations and in an even higher level of protection of the container than effected by the tested shock-absorber

  10. Void fraction instrument acceptance test procedure

    International Nuclear Information System (INIS)

    Stokes, T.I.; Pearce, K.L.

    1994-01-01

    This document presents the results of the acceptance test for the mechanical and electrical features (not specifically addressed by the software ATP) of the void fraction instrument (VFI). Acceptance testing of the VFI, control console, and decontamination spray assembly was conducted in the 306E building high bay and area adjacent to the facility. The VFI was tested in the horizontal position supported in multiple locations on rolling tables. The control console was located next to the VFI pneumatic control assembly. The VFI system was operated exactly as is expected in the tank farm, with the following exceptions: power was provided from a building outlet and the VFI was horizontal. The testing described in this document verifies that the mechanical and electrical features are operating as designed and that the unit is ready for field service

  11. Gas characterization system software acceptance test procedure

    International Nuclear Information System (INIS)

    Vo, C.V.

    1996-01-01

    This document details the Software Acceptance Testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases

  12. Summary of functional and performance test procedures

    DEFF Research Database (Denmark)

    Mitzel, Jens; Gülzow, Erich; Friedrich, K. Andreas

    Different Test Modules (TM) are defined for the functional and performance characterization of a PEMFC stack. The master document TM2.00 defines requirements and methodology for parameter variation, stability and data acquisition.......Different Test Modules (TM) are defined for the functional and performance characterization of a PEMFC stack. The master document TM2.00 defines requirements and methodology for parameter variation, stability and data acquisition....

  13. Extracorporeal shock-wave lithotripsy as an adjunct to biliary interventional procedures

    International Nuclear Information System (INIS)

    Zeman, R.K.; Garra, B.S.; Matsumoto, A.H.; Teitelbaum, G.P.; Barth, K.H.; Cattau, E.L.; Davros, W.J.; McClennan, B.L.; Picus, D.; Paushter, D.M.

    1989-01-01

    This paper reviews the records of nine patients undergoing extracorporeal shock wave lithotripsy (ESWL) of bile duct stones as an adjunct to other biliary intervention. Lithotripsy was successful in producing fragmentation in seven of nine patients. Keeping the duct mildly distended with contrast medium, distributing the shock waves over the stone(s) by taking advantage of respiratory excursion, and pinning stone fragments with balloon catheters facilitated fragmentation. Six patients underwent duct manipulation (stricture dilation, fragment extraction) within 24 hours of ESWL, suggesting that immediate instrumentation is safe in conjunction with lithotripsy

  14. Intra-operative defibrillation testing and clinical shock efficacy in patients with implantable cardioverter-defibrillators

    DEFF Research Database (Denmark)

    Bänsch, Dietmar; Bonnemeier, Hendrik; Brandt, Johan

    2015-01-01

    AIMS: This trial was designed to test the hypothesis that shock efficacy during follow-up is not impaired in patients implanted without defibrillation (DF) testing during first implantable cardioverter-defibrillator (ICD) implantation. METHODS AND RESULTS: Between February 2011 and July 2013, 107...

  15. 49 CFR 572.144 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ...-year-Old Child Crash Test Dummy, Alpha Version § 572.144 Thorax assembly and test procedure. (a) Thorax... displacement (compression) relative to the spine, measured with the chest deflection transducer (SA-572-S50...

  16. 49 CFR 572.164 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.164 Thorax assembly and test procedure. (a... specified in 49 CFR 572.124(c): (1) The maximum sternum displacement relative to the spine, measured with...

  17. Cloud-Based Electronic Test Procedures, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Procedures are critical to experimental tests as they describe the specific steps necessary to efficiently and safely carry out a test in a repeatable fashion. The...

  18. Standard Ship Test and Inspection Plan, Procedures and Database

    National Research Council Canada - National Science Library

    1999-01-01

    ... construction schedules and increased cost is the area of test and inspection. This project investigates existing rules and regulations for testing and inspection of commercial ships and identifies differences and similarities within the requirements. The results include comparison matrices, a standard test plan, a set of standard test procedures, and a sample test database developed for a typical commercial ship.

  19. Test procedure forms for sludge retrieval and packaging

    International Nuclear Information System (INIS)

    Feigenbutz, L.V.

    1994-01-01

    This document provides test procedure forms for sludge retrieval and packaging tests in the 305 Cold Test Facility. The completed and approved forms provide all descriptions, criteria and analysis to safely perform sludge equipment tests in the 305 Cold Test Facility

  20. 16 CFR 1615.4 - Test procedure.

    Science.gov (United States)

    2010-01-01

    ... Product Safety Commission. (e) Specimens and Sampling—Compliance Market Sampling Plan. Sampling plans for use in market testing of items covered by this Standard may be issued by the Consumer Product Safety... Park, North Carolina 27709. This document is also available for inspection at the National Archives and...

  1. 40 CFR 91.607 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... weekends or holidays. (iii) If the manufacturer's service or target is less than the minimum rate specified... target. (3) Service accumulation must be completed on a sufficient number of test engines during... nonroad engine sales for the United States market for the applicable year of 7,500 or greater must...

  2. 16 CFR 1201.4 - Test procedures.

    Science.gov (United States)

    2010-01-01

    ... specimens—(i) Boil test. Three pieces 12 inches by 12 inches (30 centimeters by 30 centimeters) with nominal...) [Reserved] (B) Organic-coated glass—(1) Orientation specified. Six organic-coated glass specimens 2 inches... thickness, six specimens may be used. (iii) Indoor service. Four additional samples identical to those...

  3. 40 CFR 63.309 - Performance tests and procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Performance tests and procedures. 63.309 Section 63.309 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Standards for Coke Oven Batteries § 63.309 Performance tests and procedures. (a) Except as otherwise...

  4. Acceptance test procedure: RMW Land Disposal Facility Project W-025

    International Nuclear Information System (INIS)

    Roscha, V.

    1994-01-01

    This ATP establishes field testing procedures to demonstrate that the electrical/instrumentation system functions as intended by design for the Radioactive Mixed Waste Land Disposal Facility. Procedures are outlined for the field testing of the following: electrical heat trace system; transducers and meter/controllers; pumps; leachate storage tank; and building power and lighting

  5. Standard Operating Procedure for Accelerated Corrosion Testing at ARL

    Science.gov (United States)

    2017-11-01

    ARL-TN-0855 ● NOV 2017 US Army Research Laboratory Standard Operating Procedure for Accelerated Corrosion Testing at ARL by... Corrosion Testing at ARL by Thomas A Considine Weapons and Materials Research Directorate, ARL Approved for public...November 2017 2. REPORT TYPE Technical Note 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Standard Operating Procedure for Accelerated

  6. 40 CFR 76.15 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Test methods and procedures. 76.15 Section 76.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.15 Test methods and procedures. (a) The...

  7. Influence of Test Section Geometry on the Blast Environment in an Explosively Driven Conical Shock Tube

    Science.gov (United States)

    2018-03-30

    ARL-TR-8335•MAR 2018 US Army Research Laboratory Influence of Test Section Geometry on theBlast Environment in an Explosively DrivenConical Shock...ARL-TR-8335•MAR 2018 US Army Research Laboratory Influence of Test Section Geometry on theBlast Environment in an Explosively DrivenConical Shock...TITLE AND SUBTITLE    5a. CONTRACT NUMBER  5b. GRANT NUMBER  5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S)    5d.  PROJECT  NUMBER  5e. TASK NUMBER  5f

  8. Test procedure for cation exchange chromatography

    International Nuclear Information System (INIS)

    Cooper, T.D.

    1994-01-01

    The purpose of this test plan is to demonstrate the synthesis of inorganic antimonate ion exchangers and compare their performance against the standard organic cation exchangers. Of particular interest is the degradation rate of both inorganic and organic cation exchangers. This degradation rate will be tracked by determining the ion exchange capacity and thermal stability as a function of time, radiation dose, and chemical reaction

  9. Sequential test procedures for inventory differences

    International Nuclear Information System (INIS)

    Goldman, A.S.; Kern, E.A.; Emeigh, C.W.

    1985-01-01

    By means of a simulation study, we investigated the appropriateness of Page's and power-one sequential tests on sequences of inventory differences obtained from an example materials control unit, a sub-area of a hypothetical UF 6 -to-U 3 O 8 conversion process. The study examined detection probability and run length curves obtained from different loss scenarios. 12 refs., 10 figs., 2 tabs

  10. The Sandia MEMS Passive Shock Sensor : FY08 testing for functionality, model validation, and technology readiness.

    Energy Technology Data Exchange (ETDEWEB)

    Walraven, Jeremy Allen; Blecke, Jill; Baker, Michael Sean; Clemens, Rebecca C.; Mitchell, John Anthony; Brake, Matthew Robert; Epp, David S.; Wittwer, Jonathan W.

    2008-10-01

    This report summarizes the functional, model validation, and technology readiness testing of the Sandia MEMS Passive Shock Sensor in FY08. Functional testing of a large number of revision 4 parts showed robust and consistent performance. Model validation testing helped tune the models to match data well and identified several areas for future investigation related to high frequency sensitivity and thermal effects. Finally, technology readiness testing demonstrated the integrated elements of the sensor under realistic environments.

  11. A new approach to household appliance energy test procedures

    Energy Technology Data Exchange (ETDEWEB)

    Ernebrant, S.; Wihlborg, M.

    1999-03-01

    Energy test procedures provides the industry with a method to measure its products energy consumption. The energy test procedures are the technical foundation to every energy standard and labelling system. Depending on which country the product is going to be sold in, the manufacturers must follow different standards. This report concentrates on appliance test procedures, with the main focus on refrigerators. Recently, a new technology -microcontrollers- is undermining the credibility of the test procedures. New features, saving energy in real-life, are not picked up by the test procedures. It is estimated that as much as 30% of energy could be saved with this technology. Microcontrollers have also led to the possibility to circumvent tests. A new model is presented in the report, which handles these energy savings and make it harder cheating on tests. The model divides the test procedure in two parts; hardware tests and software tests, and uses a Matlab/Simulink computer model to calculate the energy consumption. Examples of hardware- and software test methods for refrigerators are described. A refrigerator is used as an example to present the model. The possibility to harmonize the energy standards to one global standard, which could mean substantial savings and make international trade more efficient, is also discussed 24 refs, 30 figs. Examination paper

  12. Surface moisture measurement system hardware acceptance test procedure

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    The purpose of this acceptance test procedure is to verify that the mechanical and electrical features of the Surface Moisture Measurement System are operating as designed and that the unit is ready for field service. This procedure will be used in conjunction with a software acceptance test procedure, which addresses testing of software and electrical features not addressed in this document. Hardware testing will be performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  13. Report on COTECH test procedure and characterization techniques

    DEFF Research Database (Denmark)

    Islam, Mohammad Aminul

    that need to be attained for successful characterization of the planned demonstrators and it deals with the material characterization and prototype testing for the COTECH demonstrators. The summary of this report includes:  General description of COTECH industrial demonstrators  COTECH materials...... and material characterization techniques  Characterization techniques of the COTECH demonstrators  Functionality and lifecycle testing of the COTECH demonstrators Besides the general introduction and conclusion each section of the report is dedicated to the characterization techniques and test procedure.......Characterization techniques and test procedure requirements for innovative self-ligating dental brackets (EO) Section 5.Characterization techniques and test procedure requirements for smart diagnostic chips comprising a microfluidic channel system (GBO) Section 6.Characterization techniques and test procedure...

  14. Quality assurance of radiopharmaceuticals-specifications and test procedures

    International Nuclear Information System (INIS)

    Baldas, J.; Bonnyman, J.; Pojer, P.M.

    1981-08-01

    This report is a compilation of test methods used and specifications adopted for the Radiopharmaceutical Quality Assurance Test Programme conducted by the Australian Radiation Laboratory. In some cases test procedures described have been taken from various Pharmacopoeias or methods published in the literature. In other cases test methods have been developed at the ARL

  15. Evolution of seismic shock test qualification of equipment

    International Nuclear Information System (INIS)

    Berriaud, C.

    1979-01-01

    From the first nuclear power plants a new industrial problem is appeared: the seismic test qualification of equipment. Nothing was existing in this range. Methods and test experiments were to be studied and perfected in order to obtain safe results. This paper presents the evolution of this question up to now [fr

  16. 14 CFR 25.723 - Shock absorption tests.

    Science.gov (United States)

    2010-01-01

    ... the greater value of landing impact energy. (2) The test attitude of the landing gear unit and the... manner consistent with the development of rational or conservative limit loads. (b) The landing gear may... acting during the landing impact. (c) In lieu of the tests prescribed in this section, changes in...

  17. New energy test procedures for refrigerators and other appliances; FINAL

    International Nuclear Information System (INIS)

    Meier, Alan; Ernebrant, Stefan; Kawamoto, Kaoru; Wihlborg, Mats

    1999-01-01

    Many innovations in refrigerator design rely on microprocessors, sensors, and algorithms to control automatic defrost, variable speed,and other features. Even though these features strongly influence energy consumption, the major energy test procedures presently test only a refrigerator's mechanical efficiency and ignore the ''software'' aspects. We describe a new test procedure where both ''hardware'' and ''software'' tests are fed into a dynamic simulation model. A wide range of conditions can be tested and simulated. This approach promotes international harmonization because the simulation model can also be programmed to estimate energy use for the ISO, DOE, or JIS test. The approach outlined for refrigerators can also be applied to other appliances

  18. Biaxial testing for fabrics and foils optimizing devices and procedures

    CERN Document Server

    Beccarelli, Paolo

    2015-01-01

    This book offers a well-structured, critical review of current design practice for tensioned membrane structures, including a detailed analysis of the experimental data required and critical issues relating to the lack of a set of design codes and testing procedures. The technical requirements for biaxial testing equipment are analyzed in detail, and aspects that need to be considered when developing biaxial testing procedures are emphasized. The analysis is supported by the results of a round-robin exercise comparing biaxial testing machines that involved four of the main research laboratories in the field. The biaxial testing devices and procedures presently used in Europe are extensively discussed, and information is provided on the design and implementation of a biaxial testing rig for architectural fabrics at Politecnico di Milano, which represents a benchmark in the field. The significance of the most recent developments in biaxial testing is also explored.

  19. Over-the-road shock and vibration testing of the radioisotope thermoelectric generator transportation system

    International Nuclear Information System (INIS)

    Becker, D.L.

    1997-01-01

    Radioisotope Thermoelectric Generators (RTG) convert heat generated by radioactive decay into electricity through the use of thermocouples. The RTGs have a long operating life, are reasonably lightweight, and require little or no maintenance, which make them particularly attractive for use in spacecraft. However, because RTGs contain significant quantities of radioactive materials, normally plutonium-238 and its decay products, they must be transported in packages built in accordance with Title 10, Code of Federal Regulations, Part 71 (10 CFR 71). To meet these regulations, a RTG Transportation System (RTGTS) that fully complies with 10 CFR 71 has been developed, which protects RTGs from adverse environmental conditions during normal conditions of transport (e.g., shock, vibration, and heat). To ensure the protection of RTGs from shock and vibration loadings during transport, extensive over-the-road testing was conducted on the RTG'S to obtain real-time recordings of accelerations of the air-ride suspension system trailer floor, packaging, and support structure. This paper provides an overview of the RTG'S, a discussion of the shock and vibration testing, and a comparison of the test results to the specified shock response spectra and power spectral density acceleration criteria

  20. Vehicle accelerated corrosion test procedures for automotive in Malaysia

    Directory of Open Access Journals (Sweden)

    Anuar Liza

    2017-01-01

    Full Text Available An accelerated corrosion test, known as proving ground accelerated test, is commonly performed by automotive manufacturers to evaluate the corrosion performance of a vehicle. The test combines corrosion and durability inputs to detect potential failures that may occur during in-service conditions. Currently, the test is conducted at an external test center overseas. Such test is aimed to simulate the effects of one year accelerated corrosion in severe corrosive environment of the north-east and south east of America. However, the test results obtained do not correlate with the actual corrosion conditions observed in the Malaysian market, which is likely attributed to the different test environment of the tropical climate of vehicles in service. Therefore, a vehicle accelerated corrosion test procedure that suits the Malaysian market is proposed and benchmarked with other global car manufacturers that have their own dedicated corrosion test procedure. In the present work, a test track is used as the corrosion test ground and consists of various types of roads for structural durability exposures. Corrosion related facilities like salt trough, mud trough and gravel road are constructed as addition to the existing facilities. The establishment of accelerated corrosion test facilities has contributed to the development of initial accelerated corrosion test procedure for the national car manufacturer. The corrosion exposure is monitored by fitting test coupons at the underbody of test vehicle using mass loss technique so that the desired corrosion rate capable of simulating the real time corrosion effects for its target market.

  1. 40 CFR 600.111-08 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... § 600.109(b) while sampling the exhaust gas. (viii) Sampling must begin two seconds before beginning the... convenience of the user, the revised text is set forth as follows: § 600.111-08 Test procedures. (f) Special...

  2. Test Procedure - pumping system for caustic addition project

    International Nuclear Information System (INIS)

    Leshikar, G.A.

    1994-01-01

    This test procedure provides the requirements for sub-system testing and integrated operational testing of the submersible mixer pump and caustic addition equipment by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  3. Specifications for Testing Procedures at Svåheia

    DEFF Research Database (Denmark)

    Margheritini, Lucia; Kofoed, Jens Peter

    This report is realized in order to define testing procedures of the SSG pilot in Svåheia location. This will be done by listing all the relevant parameters related to the structure performance.......This report is realized in order to define testing procedures of the SSG pilot in Svåheia location. This will be done by listing all the relevant parameters related to the structure performance....

  4. CEL Working procedures for WRAP 2A formulation development test

    International Nuclear Information System (INIS)

    Duchsherer, M.J.

    1994-01-01

    The WRAP 2A facility will encapsulate retrieved, stored, and newly generated contact-handled mixed low level waste (MLLW) into 55-500 gal cementitous forms. Standardized test procedures will be required to facilitate this process. Cementitous specimens will be prepared from simulated drum wastes and will be tested in the Chemical Engineering Laboratory using the laboratory operating/working procedures encorporated into this document

  5. Corrosion performance tests for reinforcing steel in concrete : test procedures.

    Science.gov (United States)

    2009-09-01

    The existing test method to assess the corrosion performance of reinforcing steel embedded in concrete, mainly : ASTM G109, is labor intensive, time consuming, slow to provide comparative results, and often expensive. : However, corrosion of reinforc...

  6. Observational test of shock drift and Fermi acceleration on a seed particle population upstream of earth's bow shock

    Science.gov (United States)

    Anagnostopoulos, G. C.; Sarris, E. T.; Krimigis, S. M.

    1988-01-01

    The efficiency of proposed shock acceleration mechanisms as they operate at the bow shock in the presence of a seed energetic particle population was examined using data from simultaneous observations of energetic solar-origin protons, carried out by the IMP 7 and 8 spacecraft in the vicinity of the quasi-parallel (dawn) and quasi-perpendicular (dusk) regions of the earth's bow shock, respectively. The results of observations (which include acceleration effects in the intensities of the energetic protons with energies as high as 4 MeV observed at the vicinity of the dusk bow shock, but no evidence for any particle acceleration at the energy equal to or above 50 keV at the dawn side of the bow shock) indicate that the acceleration of a seed particle population occurs only at the quasi-perpendicular bow shock through shock drift acceleration and that the major source of observed upstream ion populations is the leakage of magnetospheric ions of energies not less than 50 keV, rather than in situ acceleration.

  7. 40 CFR Appendix I to Subpart V of... - Recommended Test Procedures and Test Criteria and Recommended Durability Procedures To...

    Science.gov (United States)

    2010-07-01

    ... closing temperature shall be measured on an increasing temperature change. C. Carburetor Accelerator Pumps.... Reserved for Camshafts N. Reserved for Pistons O. Oxidizing Catalytic Converters 1. Test Procedures and...

  8. Test Operations Procedure (TOP) 06-2-301 Wind Testing

    Science.gov (United States)

    2017-06-14

    The wind direction should be perpendicular to the faces selected for exposure. If testing is performed outdoors, cross winds can change the wind...14 June 2017 4 b. The item geometry will influence the requirements for the wind direction tolerance. For example , if the item is symmetrical...3 3.2 Wind Direction

  9. Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101 Flexible Receiver System, Phase III Testing. This procedure will test the sealing integrity of the Flexible Receiver System to ensure that release of waste and aerosols will be minimized during the removal of the test mixer pump from tank SY-101

  10. Test equality between two binary screening tests with a confirmatory procedure restricted on screen positives.

    Science.gov (United States)

    Lui, Kung-Jong; Chang, Kuang-Chao

    2015-01-01

    In studies of screening accuracy, we may commonly encounter the data in which a confirmatory procedure is administered to only those subjects with screen positives for ethical concerns. We focus our discussion on simultaneously testing equality of sensitivity and specificity between two binary screening tests when only subjects with screen positives receive the confirmatory procedure. We develop four asymptotic test procedures and one exact test procedure. We derive sample size calculation formula for a desired power of detecting a difference at a given nominal [Formula: see text]-level. We employ Monte Carlo simulation to evaluate the performance of these test procedures and the accuracy of the sample size calculation formula developed here in a variety of situations. Finally, we use the data obtained from a study of the prostate-specific-antigen test and digital rectal examination test on 949 Black men to illustrate the practical use of these test procedures and the sample size calculation formula.

  11. Numerical procedure for the calculation of nonsteady spherical shock fronts with radiation

    International Nuclear Information System (INIS)

    Winkler, K.H.

    The basis of the numerical method is an implicit difference scheme with time backward differences to a freely moving coordinate system. The coordinate system itself is determined simultaneously with the iterative solution of the physical equations as a function of the physical variables. Shock fronts, even nonsteady ones, are calculated as discontinuities according to the Rankine--Hugoniot equations. The radiation field is obtained from the two-dimensional, static, spherically symmetric transport equation in conjunction with the time-dependent one-dimensional moment equations. No artificial viscosity of any type is ever used. The applicability of the method developed is demonstrated by an example involving the calculation of protostar collapse. 11 figures

  12. Molecular Line Emission from Multifluid Shock Waves. I. Numerical Methods and Benchmark Tests

    Science.gov (United States)

    Ciolek, Glenn E.; Roberge, Wayne G.

    2013-05-01

    We describe a numerical scheme for studying time-dependent, multifluid, magnetohydrodynamic shock waves in weakly ionized interstellar clouds and cores. Shocks are modeled as propagating perpendicular to the magnetic field and consist of a neutral molecular fluid plus a fluid of ions and electrons. The scheme is based on operator splitting, wherein time integration of the governing equations is split into separate parts. In one part, independent homogeneous Riemann problems for the two fluids are solved using Godunov's method. In the other, equations containing the source terms for transfer of mass, momentum, and energy between the fluids are integrated using standard numerical techniques. We show that, for the frequent case where the thermal pressures of the ions and electrons are Lt magnetic pressure, the Riemann problems for the neutral and ion-electron fluids have a similar mathematical structure which facilitates numerical coding. Implementation of the scheme is discussed and several benchmark tests confirming its accuracy are presented, including (1) MHD wave packets ranging over orders of magnitude in length- and timescales, (2) early evolution of multifluid shocks caused by two colliding clouds, and (3) a multifluid shock with mass transfer between the fluids by cosmic-ray ionization and ion-electron recombination, demonstrating the effect of ion mass loading on magnetic precursors of MHD shocks. An exact solution to an MHD Riemann problem forming the basis for an approximate numerical solver used in the homogeneous part of our scheme is presented, along with derivations of the analytic benchmark solutions and tests showing the convergence of the numerical algorithm.

  13. MOLECULAR LINE EMISSION FROM MULTIFLUID SHOCK WAVES. I. NUMERICAL METHODS AND BENCHMARK TESTS

    International Nuclear Information System (INIS)

    Ciolek, Glenn E.; Roberge, Wayne G.

    2013-01-01

    We describe a numerical scheme for studying time-dependent, multifluid, magnetohydrodynamic shock waves in weakly ionized interstellar clouds and cores. Shocks are modeled as propagating perpendicular to the magnetic field and consist of a neutral molecular fluid plus a fluid of ions and electrons. The scheme is based on operator splitting, wherein time integration of the governing equations is split into separate parts. In one part, independent homogeneous Riemann problems for the two fluids are solved using Godunov's method. In the other, equations containing the source terms for transfer of mass, momentum, and energy between the fluids are integrated using standard numerical techniques. We show that, for the frequent case where the thermal pressures of the ions and electrons are << magnetic pressure, the Riemann problems for the neutral and ion-electron fluids have a similar mathematical structure which facilitates numerical coding. Implementation of the scheme is discussed and several benchmark tests confirming its accuracy are presented, including (1) MHD wave packets ranging over orders of magnitude in length- and timescales, (2) early evolution of multifluid shocks caused by two colliding clouds, and (3) a multifluid shock with mass transfer between the fluids by cosmic-ray ionization and ion-electron recombination, demonstrating the effect of ion mass loading on magnetic precursors of MHD shocks. An exact solution to an MHD Riemann problem forming the basis for an approximate numerical solver used in the homogeneous part of our scheme is presented, along with derivations of the analytic benchmark solutions and tests showing the convergence of the numerical algorithm.

  14. The influence of different measurement structures on NRTA test procedures

    International Nuclear Information System (INIS)

    Beedgen, R.

    1986-01-01

    The development of sequential statistical test procedures in the area of near real time material accountancy (NRTA) mostly assumed a fixed measurement model of a given model facility. In this paper different measurement models (dispersion matrices) for a sequence of balance periods are studied. They are used to compare the detection probabilities of three different sequential test procedures for losses of material. It is shown how different plant models have an influence on the sensitivity of specified tests. Great importance for that analysis have the optimal loss patterns in each measurement situation

  15. Operational test procedure for SY tank farm replacement exhauster unit

    International Nuclear Information System (INIS)

    McClees, J.

    1995-01-01

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly

  16. Procedures for Selecting Items for Computerized Adaptive Tests.

    Science.gov (United States)

    Kingsbury, G. Gage; Zara, Anthony R.

    1989-01-01

    Several classical approaches and alternative approaches to item selection for computerized adaptive testing (CAT) are reviewed and compared. The study also describes procedures for constrained CAT that may be added to classical item selection approaches to allow them to be used for applied testing. (TJH)

  17. AP-102/104 Retrieval control system qualification test procedure

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents

  18. European wind turbine procedure development blade test methods and techniques

    Energy Technology Data Exchange (ETDEWEB)

    Bulder, B H; Dam, J J.D. van; Delft, D R.V. van [and others

    1999-03-01

    In this paper the preliminary results obtained by performing the second task of the `European Wind Turbine Testing Procedure Development` project are presented. This project is performed within and with financial support of the Standards, Measurements and Testing programme of the European Commission. (au)

  19. 40 CFR 205.57-4 - Testing procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Testing procedures. 205.57-4 Section 205.57-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205.57-4 Testing...

  20. 16 CFR 1209.7 - Test procedures for smoldering combustion.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for smoldering combustion. 1209.7 Section 1209.7 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY... for smoldering combustion. This section provides the test method for determining smoldering combustion...

  1. Test of a new heat-flow equation for dense-fluid shock waves.

    Science.gov (United States)

    Holian, Brad Lee; Mareschal, Michel; Ravelo, Ramon

    2010-09-21

    Using a recently proposed equation for the heat-flux vector that goes beyond Fourier's Law of heat conduction, we model shockwave propagation in the dense Lennard-Jones fluid. Disequilibrium among the three components of temperature, namely, the difference between the kinetic temperature in the direction of a planar shock wave and those in the transverse directions, particularly in the region near the shock front, gives rise to a new transport (equilibration) mechanism not seen in usual one-dimensional heat-flow situations. The modification of the heat-flow equation was tested earlier for the case of strong shock waves in the ideal gas, which had been studied in the past and compared to Navier-Stokes-Fourier solutions. Now, the Lennard-Jones fluid, whose equation of state and transport properties have been determined from independent calculations, allows us to study the case where potential, as well as kinetic contributions are important. The new heat-flow treatment improves the agreement with nonequilibrium molecular-dynamics simulations under strong shock wave conditions, compared to Navier-Stokes.

  2. Developing a Cloze Procedure as a Reading Comprehension Achievement Test

    Directory of Open Access Journals (Sweden)

    I Ketut Seken

    2004-01-01

    Full Text Available The project was concerned with developing a cloze procedure as a reading comprehension achievement test. The subjects were students of the English Department of the Faculty of Letters, State University of Malang, who were halfway in the semester to complete Reading II course. The test was planned and constructed on the foundation of existing theory of cloze test construction. A review of theory concerning reading comprehension, testing reading comprehension, and cloze testing led to the construction of the test, including the decision concerning how to score the test and to interpret the scores. Using a class of 28 students, the test was tried out a week after the mid-semester test was administered by the Reading II teacher. It was found that the test is sufficienty reliable on the basis of a reliability coefficient of .79 through split-half procedure and a coefficient value of .78 by K-R 20. The test also showed high inter-section correlation. The validity of the test was viewed in terms of face, content, and construct. The test scores correlate moderately with those obtained from the mid-semester test by the teacher. Some problems are discussed and a suggestion made with regard to a possible solution to these problems.

  3. ENRAF Series 854 Advanced Technology Gauge (ATG) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    HUBER, J.H.

    1999-01-01

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area. This ATP does not set up the gauge for any specific tank, but is generalized to permit testing the gauge prior to installation package preparation

  4. Operability test procedure [Tank] 241-SY-101 equipment removal system

    International Nuclear Information System (INIS)

    Mast, J.C.

    1994-01-01

    The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation

  5. European wind turbine testing procedure developments. Task 2: Power quality

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Friis Pedersen, Troels; Gerdes, G.

    2001-01-01

    The present report describes the work done in the power quality subtask of the European Wind Turbine Testing Procedure Developments project funded by the EU SMT program. The objective of the power quality subtask has been to make recommendations andprovide background for new standards...... for measurement and testing of wind turbine power quality. The focus in the work has been to support the ongoing standardisation work in IEC with a new standard IEC61400-21 for measurement and assessment of powerquality characteristics of grid connected wind turbines. The work has also been based on the power...... quality measuremnet procedure in the Measnet cooperation of European test stations for wind turbines. The first working item of the project has been toverify the state of the art of the measurement procedures by analyses and comparisons of the measurements and data processing software of the participating...

  6. Stochastic shock response spectrum decomposition method based on probabilistic definitions of temporal peak acceleration, spectral energy, and phase lag distributions of mechanical impact pyrotechnic shock test data

    Science.gov (United States)

    Hwang, James Ho-Jin; Duran, Adam

    2016-08-01

    Most of the times pyrotechnic shock design and test requirements for space systems are provided in Shock Response Spectrum (SRS) without the input time history. Since the SRS does not describe the input or the environment, a decomposition method is used to obtain the source time history. The main objective of this paper is to develop a decomposition method producing input time histories that can satisfy the SRS requirement based on the pyrotechnic shock test data measured from a mechanical impact test apparatus. At the heart of this decomposition method is the statistical representation of the pyrotechnic shock test data measured from the MIT Lincoln Laboratory (LL) designed Universal Pyrotechnic Shock Simulator (UPSS). Each pyrotechnic shock test data measured at the interface of a test unit has been analyzed to produce the temporal peak acceleration, Root Mean Square (RMS) acceleration, and the phase lag at each band center frequency. Maximum SRS of each filtered time history has been calculated to produce a relationship between the input and the response. Two new definitions are proposed as a result. The Peak Ratio (PR) is defined as the ratio between the maximum SRS and the temporal peak acceleration at each band center frequency. The ratio between the maximum SRS and the RMS acceleration is defined as the Energy Ratio (ER) at each band center frequency. Phase lag is estimated based on the time delay between the temporal peak acceleration at each band center frequency and the peak acceleration at the lowest band center frequency. This stochastic process has been applied to more than one hundred pyrotechnic shock test data to produce probabilistic definitions of the PR, ER, and the phase lag. The SRS is decomposed at each band center frequency using damped sinusoids with the PR and the decays obtained by matching the ER of the damped sinusoids to the ER of the test data. The final step in this stochastic SRS decomposition process is the Monte Carlo (MC

  7. Empirical testing of forecast update procedure forseasonal products

    DEFF Research Database (Denmark)

    Wong, Chee Yew; Johansen, John

    2008-01-01

    Updating of forecasts is essential for successful collaborative forecasting, especially for seasonal products. This paper discusses the results of a theoretical simulation and an empirical test of a proposed time-series forecast updating procedure. It involves a two-stage longitudinal case study...... of a toy supply chain. The theoretical simulation involves historical weekly consumer demand data for 122 toy products. The empirical test is then carried out in real-time with 291 toy products. The results show that the proposed forecast updating procedure: 1) reduced forecast errors of the annual...... provided less forecast accuracy improvement and it needed a longer time to achieve relatively acceptable forecast uncertainty....

  8. Acceptance test procedure for High Pressure Water Jet System

    International Nuclear Information System (INIS)

    Crystal, J.B.

    1995-01-01

    The overall objective of the acceptance test is to demonstrate a combined system. This includes associated tools and equipment necessary to perform cleaning in the 105 K East Basin (KE) for achieving optimum reduction in the level of contamination/dose rate on canisters prior to removal from the KE Basin and subsequent packaging for disposal. Acceptance tests shall include necessary hardware to achieve acceptance of the cleaning phase of canisters. This acceptance test procedure will define the acceptance testing criteria of the high pressure water jet cleaning fixture. The focus of this procedure will be to provide guidelines and instructions to control, evaluate and document the acceptance testing for cleaning effectiveness and method(s) of removing the contaminated surface layer from the canister presently identified in KE Basin. Additionally, the desired result of the acceptance test will be to deliver to K Basins a thoroughly tested and proven system for underwater decontamination and dose reduction. This report discusses the acceptance test procedure for the High Pressure Water Jet

  9. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    International Nuclear Information System (INIS)

    WHITE, D.A.

    2000-01-01

    Shop test of the sludge mobilization cart system to be used in the AZ-101 Mixer Pump Demonstration Test Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software

  10. 241-AZ-101 Mixer Pump Demonstration Test Gamma Cart Acceptance Test Procedure and Quality Test Plan (ATP and QTP)

    International Nuclear Information System (INIS)

    WHITE, D.A.

    2000-01-01

    Shop Test of the Gamma Cart System to be used in the AZ-101 Mixer Pump Demonstration Test. Tests hardware and software. This procedure involves testing the Instrumentation involved with the Gamma Cart System, local and remote, including: depth indicators, speed controls, interface to data acquisition software and the raising and lowering functions. This Procedure will be performed twice, once for each Gamma Cart System. This procedure does not test the accuracy of the data acquisition software

  11. Statistical approach for collaborative tests, reference material certification procedures

    International Nuclear Information System (INIS)

    Fangmeyer, H.; Haemers, L.; Larisse, J.

    1977-01-01

    The first part introduces the different aspects in organizing and executing intercomparison tests of chemical or physical quantities. It follows a description of a statistical procedure to handle the data collected in a circular analysis. Finally, an example demonstrates how the tool can be applied and which conclusion can be drawn of the results obtained

  12. 49 CFR 572.124 - Thorax assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... test procedure in paragraph (c) of this section: (1) The maximum sternum displacement (compression... displacement but before reaching the minimum required 38.0 mm (1.5 in) sternum displacement limit shall not exceed 1500 N (337.2 lbf). (2) The internal hysteresis of the ribcage in each impact as determined by the...

  13. Testing the applicability of the SASS5 scoring procedure for ...

    African Journals Online (AJOL)

    A study was undertaken between 29th January and 17th February 2004 to test the applicability of the South African Scoring System Version 5 (SASS5) scoring and calculation procedure in nutrient-enriched palustrine wetlands in the midlands of KwaZulu-Natal, South Africa. Four reference wetlands and three dairy-effluent ...

  14. Operating experience and procedures at the tritium systems test assembly

    International Nuclear Information System (INIS)

    Carlson, R.V.; Binning, K.E.; Cole, S.P.; Jenkins, E.M.; Wilhelm, R.C.; Cole, S.P.

    1988-01-01

    Operating procedures are important for the safe and efficient operation of the Tritium Systems Test Assembly (TSTA). TSTA has been operating for four years with tritium in a safe and efficient manner. The inventory of tritium in the process loop is 100 grams and several milestone runs have been completed. This paper describes the methods used to operate TSTA. 3 refs., 1 fig

  15. 16 CFR 1501.4 - Size requirements and test procedure.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Size requirements and test procedure. 1501.4 Section 1501.4 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION FEDERAL HAZARDOUS SUBSTANCES ACT.... The metric approximations are included only for convenience.) (b)(1) Place the article, without...

  16. 40 CFR 86.227-94 - Test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Test procedures; overview. 86.227-94 Section 86.227-94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... 1994 and Later Model Year Gasoline-Fueled New Light-Duty Vehicles, New Light-Duty Trucks and New Medium...

  17. 40 CFR 92.123 - Test procedure; general requirements.

    Science.gov (United States)

    2010-07-01

    ... the test. Auxiliary fan(s) may be used to maintain engine cooling during operation on the dynamometer... smoke. (1) In the raw exhaust sampling procedure, sample is collected directly from the exhaust stream... of another raw exhaust sample. The fuel flow rate for each throttle setting is measured. (2) For...

  18. 40 CFR 86.1527 - Idle test procedure; overview.

    Science.gov (United States)

    2010-07-01

    ... from a single exhaust pipe in which exhaust products are homogeneously mixed. The configuration for... additional “Y” pipe be placed in the exhaust system before dilution. [48 FR 52252, Nov. 16, 1983... determine the raw concentration (in percent) of CO in the exhaust flow at idle. The test procedure begins...

  19. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays

  20. Thermal shock testing of low-Z coatings with pulsed hydrogen beams

    International Nuclear Information System (INIS)

    Nakamura, Kazuyuki

    1982-03-01

    Thermal shock testing of candidate low-Z surface coatings for JT-60 application has been made by using a pulsed hydrogen beam apparatus which is operated at a power density of 2KW/cm 2 . The materials tested are PVD (Physical Vapor Deposited) TiC and PVD and CVD (Chemical Vapor Deposited) TiN on molybdenum and Inconel 625. The result shows that CVD TiC on Mo and CVD TiN on Inconel are the most interesting choices for the coating-substrate combinations. (author)

  1. COLLISIONLESS SHOCKS IN A PARTIALLY IONIZED MEDIUM. I. NEUTRAL RETURN FLUX AND ITS EFFECTS ON ACCELERATION OF TEST PARTICLES

    Energy Technology Data Exchange (ETDEWEB)

    Blasi, P.; Morlino, G.; Bandiera, R.; Amato, E. [INAF-Osservatorio Astrofisico di Arcetri, Largo E. Fermi, 5, I-50125 Firenze (Italy); Caprioli, D. [Department of Astrophysical Sciences, Peyton Hall, Princeton University, Princeton, NJ 08540 (United States)

    2012-08-20

    A collisionless shock may be strongly modified by the presence of neutral atoms through the processes of charge exchange between ions and neutrals and ionization of the latter. These two processes lead to exchange of energy and momentum between charged and neutral particles both upstream and downstream of the shock. In particular, neutrals that suffer a charge exchange downstream with shock-heated ions generate high-velocity neutrals that have a finite probability of returning upstream. These neutrals might then deposit heat in the upstream plasma through ionization and charge exchange, thereby reducing the fluid Mach number. A consequence of this phenomenon, which we refer to as the neutral return flux, is a reduction of the shock compression factor and the formation of a shock precursor upstream. The scale length of the precursor is determined by the ionization and charge-exchange interaction lengths of fast neutrals moving toward upstream infinity. In the case of a shock propagating in the interstellar medium, the effects of ion-neutral interactions are especially important for shock velocities <3000 km s{sup -1}. Such propagation velocities are common among shocks associated with supernova remnants, the primary candidate sources for the acceleration of Galactic cosmic rays. We then investigate the effects of the return flux of neutrals on the spectrum of test particles accelerated at the shock. We find that, for shocks slower than {approx}3000 km s{sup -1}, the particle energy spectrum steepens appreciably with respect to the naive expectation for a strong shock, namely, {proportional_to}E{sup -2}.

  2. Endurance test for IR rig for RI production assembly (test procedure)

    International Nuclear Information System (INIS)

    Chung, Heung June; Ryu, Jeong Soo

    2000-08-01

    This test procedure details the test loop, test method, and test procedure for pressure drop, vibration and endurance test of IR Rig for RI production. From the pressure drop test, the hydraulic design requirements of the capsule are verified. HANARO limit condition is checked and the compatibility with HANARO core is verified. From flow induced vibration test vibration frequency and displacement are investigated. The wear of IR Rig is investigated through endurance test, and these data are used to evaluate the expected wear at maximum resident time of the IR Rig for RI production

  3. Test Procedure for Axially Loaded Piles in Sand

    DEFF Research Database (Denmark)

    Thomassen, Kristina

    The test procedure described in the following is used when examining the effects of static or cyclic loading on the skin friction of an axially loaded pile in dense sand. The pile specimen is only loaded in tension to avoid any contribution from the base resistance. The pile dimensions are chosen...... to resemble full scale dimension of piles used in offshore pile foundations today. In this report is given a detailed description of the soil preparation and pile installation procedures as well data acquisition methods....

  4. 100 Area soil washing bench-scale test procedures

    International Nuclear Information System (INIS)

    Freeman, H.D.; Gerber, M.A.; Mattigod, S.V.; Serne, R.J.

    1993-03-01

    This document describes methodologies and procedures for conducting soil washing treatability tests in accordance with the 100 Area Soil Washing Treatability Test Plan (DOE-RL 1992, Draft A). The objective of this treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. These data will be primarily used for determining feasibility of the individual unit operations and defining the requirements for a system, or systems, for pilot-scale testing

  5. Development test procedure High Pressure Water Jet System

    International Nuclear Information System (INIS)

    Crystal, J.B.

    1995-01-01

    Development testing will be performed on the water jet cleaning fixture to determine the most effective arrangement of water jet nozzles to remove contamination from the surfaces of canisters and other debris. The following debris may be stained with dye to simulate surface contaminates: Mark O, Mark I, and Mark II Fuel Storage Canisters (both stainless steel and aluminum), pipe of various size, (steel, stainless, carbon steel and aluminum). Carbon steel and stainless steel plate, channel, angle, I-beam and other surfaces, specifically based on the Scientific Ecology Group (SEG) inventory and observations of debris within the basin. Test procedure for developmental testing of High Pressure Water Jet System

  6. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  7. Failure analysis of glass-ceramic insulators of shock tested vacuum (neutron) tubes

    International Nuclear Information System (INIS)

    Spears, R.K.

    1980-01-01

    Eight investigative techniques were used to examine the glass-ceramic insulators in vacuum (neutron) tubes. The insulators were extracted from units that had been subjected to low temperature mechanical shock tests. Two of the three units showed reduced neutron output after these tests and an insulator on one of these two was cracked completely through which probably occurred during shock testing. The objective of this study was to determine if any major differences existed between the insulators of these tubes. After eight analyses, it was concluded that no appreciable differences existed. It appeared that cracking of the one glass-ceramic sample was initiated at inner-sleeve interface voids. For this sample, the interface void density was much higher than is presently acceptable. All insulators were made with glass-ceramic having a Na 2 O content of 4.6 wt%. An increased Na 2 O content will cause an increase in the coefficient of expansion and will reduce the residual stress level since the molybdenum has a higher coefficient of thermal expansion than the insulator. Thus, it is believed that a decrease in interface voids and an increase in Na 2 O should aid in reduced cracking of the insulator during these tests

  8. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  9. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  10. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  11. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  12. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  13. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    International Nuclear Information System (INIS)

    JOHNSTON, D.C.

    2000-01-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A

  14. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  15. Project W-049H collection system Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Carrigan, M.C.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the collection system equipment installed as Pump Station No. 1 (225-W) and Pump Station No. 2 (225-E) have been installed in accordance with the design documents and function as required by the project criteria. This will be a wet test with potable water being introduced into the pump pits to test for leakage. Potable water will also be employed in the testing of the pumps and related mechanical equipment. All Instrument and Control equipment related to the pump stations will be checked electronically with simulated inputs/outputs when actual input/output signals are unavailable. Water from Pump Station 1 will be moved through the TEDF piping system and discharged into the disposal ponds. This will check the proper function of the air/vac valves not tested during construction, and the automated samplers

  16. Acceptance Test Procedure: SY101 air pallet system

    International Nuclear Information System (INIS)

    Koons, B.M.

    1995-01-01

    The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose

  17. Prognostic value of brachioradialis muscle oxygen saturation index and vascular occlusion test in septic shock patients.

    Science.gov (United States)

    Marín-Corral, J; Claverias, L; Bodí, M; Pascual, S; Dubin, A; Gea, J; Rodriguez, A

    2016-05-01

    To compare rSO2 (muscle oxygen saturation index) static and dynamic variables obtained by NIRS (Near Infrared Spectroscopy) in brachioradialis muscle of septic shock patients and its prognostic implications. Prospective and observational study. Intensive care unit. Septic shock patients and healthy volunteers. The probe of a NIRS device (INVOS 5100) was placed on the brachioradialis muscle during a vascular occlusion test (VOT). Baseline, minimum and maximum rSO2 values, deoxygenation rate (DeOx), reoxygenation slope (ReOx) and delta value. Septic shock patients (n=35) had lower baseline rSO2 (63.8±12.2 vs. 69.3±3.3%, p<0.05), slower DeOx (-0.54±0.31 vs. -0.91±0.35%/s, p=0.001), slower ReOx (2.67±2.17 vs. 9.46±3.5%/s, p<0.001) and lower delta (3.25±5.71 vs. 15.1±3.9%, p<0.001) when compared to healthy subjects (n=20). Among septic shock patients, non-survivors showed lower baseline rSO2 (57.0±9.6 vs. 69.8±11.3%, p=0.001), lower minimum rSO2 (36.0±12.8 vs. 51.3±14.8%, p<0.01) and lower maximum rSO2 values (60.6±10.6 vs. 73.3±11.2%, p<0.01). Baseline rSO2 was a good mortality predictor (AUC 0.79; 95%CI: 0.63-0.94, p<0.01). Dynamic parameters obtained with VOT did not improve the results. Septic shock patients present an important alteration of microcirculation that can be evaluated by NIRS with prognostic implications. Monitoring microvascular reactivity in the brachioradialis muscle using VOT with our device does not seem to improve the prognostic value of baseline rSO2. Copyright © 2015 Elsevier España, S.L.U. and SEMICYUC. All rights reserved.

  18. Operatibility test procedure for the Waste Information and Control System

    International Nuclear Information System (INIS)

    Flynn, D.F.

    1994-01-01

    This document describes the operability test procedure for the WICS. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE)

  19. Impact of Isothermal Aging and Testing Temperature on Large Flip-Chip BGA Interconnect Mechanical Shock Performance

    Science.gov (United States)

    Lee, Tae-Kyu; Chen, Zhiqiang; Guirguis, Cherif; Akinade, Kola

    2017-10-01

    The stability of solder interconnects in a mechanical shock environment is crucial for large body size flip-chip ball grid array (FCBGA) electronic packages. Additionally, the junction temperature increases with higher electric power condition, which brings the component into an elevated temperature environment, thus introducing another consideration factor for mechanical stability of interconnection joints. Since most of the shock performance data available were produced at room temperature, the effect of elevated temperature is of interest to ensure the reliability of the device in a mechanical shock environment. To achieve a stable␣interconnect in a dynamic shock environment, the interconnections must tolerate mechanical strain, which is induced by the shock wave input and reaches the particular component interconnect joint. In this study, large body size (52.5 × 52.5 mm2) FCBGA components assembled on 2.4-mm-thick boards were tested with various isothermal pre-conditions and testing conditions. With a heating element embedded in the test board, a test temperature range from room temperature to 100°C was established. The effects of elevated temperature on mechanical shock performance were investigated. Failure and degradation mechanisms are identified and discussed based on the microstructure evolution and grain structure transformations.

  20. Study on service test procedure for SMES systems

    Energy Technology Data Exchange (ETDEWEB)

    Ren, L., E-mail: rl8868@126.co [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Tang, Y.; Li, J.; Shi, J. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Hu, Y. [State Grid Electric Power Research Institute, Wuhan 430074 (China); Guo, F.; Chen, L.; Cheng, S. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2009-10-15

    Some superconducting magnetic energy storage (SMES) systems have been developed successfully, and the function of them was verified by experiment. Considering the impact on the system security and stability when they are connected to the power system, it is important to build a standard test procedure and propose the main experimental contents for some representative superconducting devices. Based on the experimental results of a 35 kJ/7 kW conduction-cooled high-T{sub c} SMES system, which was developed by Huazhong University of Science and Technology, the test items and methods for a conduction-cooled high-T{sub c} SMES system are studied. For performance evaluation of this high-T{sub c} SMES, three superconducting magnet performance tests, power conditioning characteristic test and dynamic experiment in a simulated power system were fulfilled.

  1. Study on service test procedure for SMES systems

    International Nuclear Information System (INIS)

    Ren, L.; Tang, Y.; Li, J.; Shi, J.; Hu, Y.; Guo, F.; Chen, L.; Cheng, S.

    2009-01-01

    Some superconducting magnetic energy storage (SMES) systems have been developed successfully, and the function of them was verified by experiment. Considering the impact on the system security and stability when they are connected to the power system, it is important to build a standard test procedure and propose the main experimental contents for some representative superconducting devices. Based on the experimental results of a 35 kJ/7 kW conduction-cooled high-T c SMES system, which was developed by Huazhong University of Science and Technology, the test items and methods for a conduction-cooled high-T c SMES system are studied. For performance evaluation of this high-T c SMES, three superconducting magnet performance tests, power conditioning characteristic test and dynamic experiment in a simulated power system were fulfilled.

  2. Project W-314 performance mock-up test procedure

    International Nuclear Information System (INIS)

    CARRATT, R.T.

    1999-01-01

    The purpose of this Procedure is to assist construction in the pre-operational fabrication and testing of the pit leak detection system and the low point drain assembly by: (1) Control system testing of the pit leak detection system will be accomplished by actuating control switches and verifying that the control signal is initiated, liquid testing and overall operational requirements stated in HNF-SD-W314-PDS-003, ''Project Development Specification for Pit Leak Detection''. (2) Testing of the low point floor drain assembly by opening and closing the drain to and from the ''retracted'' and ''sealed'' positions. Successful operation of this drain will be to verify that the seal does not leak on the ''sealed'' position, the assembly holds liquid until the leak detector actuates and the assembly will operate from on top of the mock-up cover block

  3. Quality assurance of radiopharmaceuticals - specifications and test procedures

    International Nuclear Information System (INIS)

    Baldas, J.; Bonnyman, J.; Colmanet, S.F.; Ivanov, Z.; Lauder, R.A.

    1990-10-01

    The authors report on a Radiopharmaceutical Quality Assurance Test Programme carried out by the Australian Radiation Laboratory in which radiopharmaceuticals used in nuclear medicine in Australia are tested for compliance with specifications. Where the radiopharmaceutical is the subject of a monograph in the British Pharmacopoeia or the European Pharmacopoeia, then the specifications given in the Pharmacopoeia are adopted. In other cases the specifications given have been adopted by this Laboratory and have no legal status. In some cases test procedures described have been taken from various Pharmacopoeias or methods published in the literature. In other cases test methods described have been developed at this Laboratory. It should be noted that, unless stated otherwise, specifications listed apply at all times up until product expire

  4. Testing of tubular goods - a critical review of past and actual testing procedures

    Energy Technology Data Exchange (ETDEWEB)

    Teodoriu, C. [Texas A and M Univ., Houston, TX (United States); Holzmann, J.; Klaws, M. [TU Clausthal (Germany). Inst. fuer Erdoel- und Erdgastechnik

    2007-09-13

    Testing of oil country tubular goods (OCTG) is based on standards and offers the user a comparison platform between products of different manufacturers. But, do the standard based testing procedures assume the real loads on OCTG? More likely, the existing standards or recommendations on tubular testing have been evolving together with the new demands on OCTG loading. Since nowadays the oil and gas industry is looking to develop extreme reservoir types (deep water, HP/HT), there is a need of a better understanding and continuous improvement of testing procedures. The following poster proposes an analysis of existing procedures to test tubular goods and then will focus on the future demands on OCTG testing. New loads, as casing fatigue, will be discussed and analyzed based on the authors experience gained during more than 8 years of testing tubular goods at the Clausthal University of Technology, Institute of Petroleum Engineering. (orig.)

  5. Assessment of Casualty Transport Equipment and Procedures Aboard U.S. Navy Submarines to Accommodate Anti-Shock Trousers

    Science.gov (United States)

    2012-10-24

    WECHSLER , CAPT, MC, USN Commanding Officer NAVSUBMEDRSCHLAB Approved for public release; distribution unlimited. Standard Form 298 (Rev. 8/98......identified: pneumatic and non-pneumatic. Pneumatic anti-shock garments, also known as military anti-shock trousers (MAST), were obtained from the David

  6. Phased Startup Initiative Phase 3 and 4 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, and loaded into the Primary Clean Machine (PCM) for fuel cleaning; and that fuel can be sorted on the Process Table, then loaded back into fuel canisters and relocated in basin storage. An option is included to load selected elements into multi-canister overpack (MCO) Fuel Baskets. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a baseline to predict the effectiveness of equipment design for control of contamination and visibility during production operation. The scope of this test procedure is to validate the operation of FRS and IWTS components as a complete system. Fuel canisters shall be processed in accordance with this test procedure such that fuel inspection results are clearly attributed to a particular set of PCM operating parameters. The Phase 3 test sequence processes a minimum of six canisters. Twenty-four contingency canisters have been identified, and will be processed if additional performance data are required. The Phase 4 test sequence processes a minimum of 29 specific canisters. Twenty-nine contingency canisters have been identified for Phase 4 activities and will be processed to complete process validation, if

  7. Dynamic loads on human and animal surrogates at different test locations in compressed-gas-driven shock tubes

    Science.gov (United States)

    Alay, E.; Skotak, M.; Misistia, A.; Chandra, N.

    2018-01-01

    Dynamic loads on specimens in live-fire conditions as well as at different locations within and outside compressed-gas-driven shock tubes are determined by both static and total blast overpressure-time pressure pulses. The biomechanical loading on the specimen is determined by surface pressures that combine the effects of static, dynamic, and reflected pressures and specimen geometry. Surface pressure is both space and time dependent; it varies as a function of size, shape, and external contour of the specimens. In this work, we used two sets of specimens: (1) anthropometric dummy head and (2) a surrogate rodent headform instrumented with pressure sensors and subjected them to blast waves in the interior and at the exit of the shock tube. We demonstrate in this work that while inside the shock tube the biomechanical loading as determined by various pressure measures closely aligns with live-fire data and shock wave theory, significant deviations are found when tests are performed outside.

  8. Applied field test procedures on petroleum release sites

    International Nuclear Information System (INIS)

    Gilbert, G.; Nichols, L.

    1995-01-01

    The effective remediation of petroleum contaminated soils and ground water is a significant issue for Williams Pipe Line Co. (Williams): costing $6.8 million in 1994. It is in the best interest, then, for Williams to adopt approaches and apply technologies that will be both cost-effective and comply with regulations. Williams has found the use of soil vapor extraction (SVE) and air sparging (AS) field test procedures at the onset of a petroleum release investigation/remediation accomplish these goals. This paper focuses on the application of AS/SVE as the preferred technology to a specific type of remediation: refined petroleum products. In situ field tests are used prior to designing a full-scale remedial system to first validate or disprove initial assumptions on applicability of the technology. During the field test, remedial system design parameters are also collected to tailor the design and operation of a full-scale system to site specific conditions: minimizing cost and optimizing effectiveness. In situ field tests should be designed and operated to simulate as close as possible the operation of a full-scale remedial system. The procedures of an in situ field test will be presented. The results of numerous field tests and the associated costs will also be evaluated and compared to full-scale remedial systems and total project costs to demonstrate overall effectiveness. There are many advantages of As/SVE technologies over conventional fluid extraction or SVE systems alone. However, the primary advantage is the ability to simultaneously reduce volatile and biodegradable compound concentrations in the phreatic, capillary fringe, and unsaturated zones

  9. Research on the Random Shock Vibration Test Based on the Filter-X LMS Adaptive Inverse Control Algorithm

    Directory of Open Access Journals (Sweden)

    Wang Wei

    2016-01-01

    Full Text Available The related theory and algorithm of adaptive inverse control were presented through the research which pointed out the adaptive inverse control strategy could effectively eliminate the noise influence on the system control. Proposed using a frequency domain filter-X LMS adaptive inverse control algorithm, and the control algorithm was applied to the two-exciter hydraulic vibration test system of random shock vibration control process and summarized the process of the adaptive inverse control strategies in the realization of the random shock vibration test. The self-closed-loop and field test show that using the frequency-domain filter-X LMS adaptive inverse control algorithm can realize high precision control of random shock vibration test.

  10. Dispersant field testing : a review of procedures and considerations

    International Nuclear Information System (INIS)

    Fingas, M.F.

    2004-01-01

    The effectiveness of a dispersant is defined by the amount of oil that the dispersant puts into the water column compared to the amount of oil that was initially spilled. Effectiveness is generally determined visually in plumes of dispersed oil that are visible from ships and aircraft. This paper describes 25 specific issues and technical concerns regarding field testing of dispersant effectiveness. Recent field tests were reviewed and literature that relates to testing procedures was sited. The 25 factors that are important for the appropriate outcome of dispersant field experiments include: mass balance; proper controls; analytical method; differential plume movement; time lag and length of time followed; mathematics of calculation and integration; lower and upper limits of analytical methods; use of remote sensing; thickness measurement; behaviour of oil with surfactant content; surfactant stripping; tracking surface oil and dispersed oil; recovering surface oil; visibility of oil from the surface; background levels of hydrocarbons; fluorescence of dispersant; herding; emulsion breaking; application success; heterogeneity of slick and plume; deposition measurements; true analytical standards; effect of wind on dispersant and slick; dispersant run-off; and weathering of the oil. It was concluded that the most important factors are the ability to determine mass balance, use proper controls, analytical methods and to avoid procedures that give incorrect results. 34 refs., 4 tabs., 1 fig

  11. Creep-fatigue assessment of a thermina test specimen using the R5 procedure

    International Nuclear Information System (INIS)

    Booth, P.; Budden, P.J.; Bate, S.K.

    1997-01-01

    A creep-fatigue life assessment of an axisymmetric 316 stainless steel test specimen under constant mechanical and cyclic thermal shock loading using the R5 Procedure is described in this paper. This test was carried out at CEA, France, and formed part of the 'Thermina' series. Stress analysis has been carried out using both full inelastic finite element analysis and also the simplified shakedown methods, based on elastic calculation, within R5. The estimates of strain range and the stress at the start of the creep dwell have then been used with R5 to estimate creep and fatigue damage per cycle and hence to make predictions of component life. The predicted lives are compared with the lives observed in the tests. The simplified R5 estimate of life, based on development of a crack of depth 200 microns, is 260 cycles using best-estimate material properties. Experimentally, cracks of depth at least 150 microns were observed in between 526 and 650 cycles, for two similar tests. The simplified R5 route therefore leads to an estimate of life which is conservative but not unduly so on this component. Detailed cyclic inelastic analysis using the ORNL constitutive model and the ABAQUS finite element code to estimate the strain range and dwell stress led to a best estimate of 618 cycles to crack initiation using R5. (author). 16 refs, 11 figs, 4 tabs

  12. Operational test procedure for Bldg 241-A-701 air compressor

    International Nuclear Information System (INIS)

    Desantis, G.N.

    1995-01-01

    This document is an Operability Test Procedure (OTP) which will verify and record that the 241-A-701 air compressor and associated equipment operates within their intended design parameters. The activities defined in this OTP will be performed to ensure the daily operation of the new compressed air system can be reliable and efficient. The Compressed Air System (CAS) for 241-A-701 supplies process and instrument air to the A, AX, AY, and AZ tank farms. The primary use of the CAS is for tank farms instrumentation, air operated valves, and air lift circulators

  13. Testing alarm resolution procedures in a fuel fabrication facility

    International Nuclear Information System (INIS)

    Smith, B.W.; Razvi, J.

    1984-07-01

    Process monitoring data can be used for generating material loss estimates. The intent of using process control data is to enhance nuclear material control and accounting for the timely detection and resolution of discrepancies. The purpose of an alarm resolution system is to distinguish between system errors and an actual loss of nuclear material. A study has been performed to develop and test a site-specific set of alarm resolution procedures. The results of the study are described and include the frequency of alarms, the causes of alarms, the type of resolution, and the modeling of loss estimates. 3 references, 2 figures, 2 tables

  14. Technical operations procedure for assembly and emplacement of the soil temperature test--test assembly

    International Nuclear Information System (INIS)

    Weber, A.P.

    1978-01-01

    A description is given of the plan for assembly, instrumentation, emplacement, and operational checkout of the soil temperature test assembly and dry well liner. The activities described cover all operations necessary to accomplish the receiving inspection, instrumentation and pre-construction handling of the dry well liner, plus all operations performed with the test article. Actual details of construction work are not covered by this procedure. Each part and/or section of this procedure is a separate function to be accomplished as required by the nature of the operation. The organization of the procedure is not intended to imply a special operational sequence or schedular requirement. Specific procedure operational sections include: receiving inspection; liner assembly operations; construction operations (by others); prepare shield plug; test article assembly and installation; and operational checkout

  15. High pulse number thermal shock tests on tungsten with steady state particle background

    Science.gov (United States)

    Wirtz, M.; Kreter, A.; Linke, J.; Loewenhoff, Th; Pintsuk, G.; Sergienko, G.; Steudel, I.; Unterberg, B.; Wessel, E.

    2017-12-01

    Thermal fatigue of metallic materials, which will be exposed to severe environmental conditions e.g. plasma facing materials in future fusion reactors, is an important issue in order to predict the life time of complete wall components. Therefore experiments in the linear plasma device PSI-2 were performed to investigate the synergistic effects of high pulse number thermal shock events (L = 0.38 GW m-2, Δt = 0.5 ms) and stationary D/He (6%) plasma particle background on the thermal fatigue behavior of tungsten. Similar to experiments with pure thermal loads, the induced microstructural and surface modifications such as recrystallization and roughening as well as crack formation become more pronounced with increasing number of thermal shock events. However, the amount of damage significantly increases for synergistic loads showing severe surface roughening, plastic deformation and erosion resulting from the degradation of the mechanical properties caused by bombardment and diffusion of D/He to the surface and the bulk of the material. Additionally, D/He induced blistering and bubble formation were observed for all tested samples, which could change the thermal and mechanical properties of near surface regions.

  16. Operability test procedure for PFP wastewater sampling facility

    International Nuclear Information System (INIS)

    Hirzel, D.R.

    1995-01-01

    Document provides instructions for performing the Operability Test of the 225-WC Wastewater Sampling Station which monitors the discharge to the Treated Effluent Disposal Facility from the Plutonium Finishing Plant. This Operability Test Procedure (OTP) has been prepared to verify correct configuration and performance of the PFP Wastewater sampling system installed in Building 225-WC located outside the perimeter fence southeast of the Plutonium Finishing Plant (PFP). The objective of this test is to ensure the equipment in the sampling facility operates in a safe and reliable manner. The sampler consists of two Manning Model S-5000 units which are rate controlled by the Milltronics Ultrasonic flowmeter at manhole No.C4 and from a pH measuring system with the sensor in the stream adjacent to the sample point. The intent of the dual sampling system is to utilize one unit to sample continuously at a rate proportional to the wastewater flow rate so that the aggregate tests are related to the overall flow and thereby eliminate isolated analyses. The second unit will only operate during a high or low pH excursion of the stream (hence the need for a pH control). The major items in this OTP include testing of the Manning Sampler System and associated equipment including the pH measuring and control system, the conductivity monitor, and the flow meter

  17. Safety panel and new procedures evaluation by simulator tests

    International Nuclear Information System (INIS)

    Meslin, T.

    1986-01-01

    With more than thirty weeks of simulator testing (for the last three years only) and approximately three hundred scenarios, EDF's experience in this field is extensive. This practice is well known within Fossil and Nuclear Generation and is well accepted by the operating teams which participate in it. Simulator testing appears to be an essential decision-making tool in the process of developing new operating aids in PWR plants. Accelerated development and the elimination of long and expensive modifications after commissioning is an economic advantage. The saving in time is obvious, since modifications are carried out continuously throughout the development phase. Finally, operators participate in the development of systems and receive fixed, well-defined applications. This practice has become systematic, and all new applications concerning the operation of PWR plants are simulator-tested, particularly 1300-MW unit computers and operating procedures, the new generation of 900-MW unit computers, and the new 1500-MW fully computerized control rooms. Finally, this simulator testing allows us to considerably increase our knowledge concerning the behavior of operators in accident situations, and special tests are performed for this purpose

  18. 40 CFR 1065.520 - Pre-test verification procedures and pre-test data collection.

    Science.gov (United States)

    2010-07-01

    ... corrective action does not resolve the deficiency, you may request to use the contaminated system as an... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Pre-test verification procedures and pre-test data collection. 1065.520 Section 1065.520 Protection of Environment ENVIRONMENTAL PROTECTION...

  19. 75 FR 59105 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug Testing...

    Science.gov (United States)

    2010-09-27

    ... 2105-AE03 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug... the Federal workplace drug testing program but also pointed out that ``* * * the Department of.... Executive Order 12866 and Regulatory Flexibility Act This Interim Final Rule is not significant for purposes...

  20. Endogenous Versus Exogenous Shocks in Complex Networks: An Empirical Test Using Book Sale Rankings

    Science.gov (United States)

    Sornette, D.; Deschâtres, F.; Gilbert, T.; Ageon, Y.

    2004-11-01

    We study the precursory and recovery signatures accompanying shocks in complex networks, that we test on a unique database of the Amazon.com ranking of book sales. We find clear distinguishing signatures classifying two types of sales peaks. Exogenous peaks occur abruptly and are followed by a power law relaxation, while endogenous peaks occur after a progressively accelerating power law growth followed by an approximately symmetrical power law relaxation which is slower than for exogenous peaks. These results are rationalized quantitatively by a simple model of epidemic propagation of interactions with long memory within a network of acquaintances. The observed relaxation of sales implies that the sales dynamics is dominated by cascades rather than by the direct effects of news or advertisements, indicating that the social network is close to critical.

  1. Acceptance test procedure for Project W-049H

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field

  2. Recommended procedures for performance testing of radiobioassay laboratories: Volume 3, In vivo test phantoms

    International Nuclear Information System (INIS)

    MacLellan, J.A.; Traub, R.J.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed for the US Department of Energy and the US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard describes the procedures necessary to establish a bioassay performance-testing laboratory and program. The bioassay performance-testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped develop testing procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria by testing the existing measurement capabilities of various bioassay laboratories. This report recommends guidelines for the preparation, handling, storage, distribution, shipping, and documentation of test phantoms used for calibration of measurement systems for direct bioassay. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented

  3. TMACS Test Procedure TP005: Sensor configuration, logging, and data conversion

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the projects acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes

  4. Acceptance test procedure for SY Tank Farm replacement exhauster unit

    Energy Technology Data Exchange (ETDEWEB)

    Becken, G.W.

    1994-12-16

    The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

  5. Approximating a free-field blast environment in the test section of an explosively driven conical shock tube

    Science.gov (United States)

    Stewart, J. B.

    2018-02-01

    This paper presents experimental data on incident overpressures and the corresponding impulses obtained in the test section of an explosively driven 10° (full angle) conical shock tube. Due to the shock tube's steel walls approximating the boundary conditions seen by a spherical sector cut out of a detonating sphere of energetic material, a 5.3-g pentolite shock tube driver charge produces peak overpressures corresponding to a free-field detonation from an 816-g sphere of pentolite. The four test section geometries investigated in this paper (open air, cylindrical, 10° inscribed square frustum, and 10° circumscribed square frustum) provide a variety of different time histories for the incident overpressures and impulses, with a circumscribed square frustum yielding the best approximation of the estimated blast environment that would have been produced by a free-field detonation.

  6. Shock wave effects in copper: Design of an experimental device for post recovery mechanical testing

    International Nuclear Information System (INIS)

    Buy, Francois; Llorca, Fabrice

    2002-01-01

    The mechanical behavior of metals may prove high changes with strain rate and pressure loading history. In order to investigate the effect of a shock on the ulterior mechanical behavior of high purity copper, we set up an experimental device inspired from G. T. Gray III's works. This device, based on the trapping of shock waves after a plane plate impact is validated by numerical simulations. The aim of these simulations is the evaluation of the heterogeneity of plastic deformation. Shock pressures up to 10 GPa have been investigated. The plastic strain levels subsequent to the shock are between 0.08 and 0.15 in the sample

  7. Operability test procedure for 211BA flow proportional sampler

    International Nuclear Information System (INIS)

    Weissenfels, R.D.

    1994-01-01

    The purpose of this operability test procedure (OTP) is to verify the 211-BA flow proportional sampler system and components function correctly as intended by design. System test will include the sampling system, all associated instrumentation, and Facility Process Monitor and Control System (FPMCS). The combined chemical sewer stream from B Plant flows through sump 211BA-SMP-01 located in 211-BA and is continuously monitored for gamma and beta radiation and pH. 211-BA has been upgraded to include a flow proportional sampler. A specified sample volume will be withdrawn at programmed intervals from the 211BA sump and deposited in a 19 liter plastic carboy. The sampler will be programmed per the vendor installation and operations manual by B Plant instrument maintenance personnel. Samples will be taken during five consecutive sample cycles with the sample volumes and sample frequencies recorded for comparison purposes. Additional tests related to the sampler include the alarm circuitry for loss of power and failure to obtain sample

  8. Methods for testing the logical structure of plant procedure documents

    International Nuclear Information System (INIS)

    Horne, C.P.; Colley, R.; Fahley, J.M.

    1990-01-01

    This paper describes an ongoing EPRI project to investigate computer based methods to improve the development, maintenance, and verification of plant operating procedures. This project began as an evaluation of the applicability of structured software analysis methods to operating procedures. It was found that these methods offer benefits, if procedures are transformed to a structured representation to make them amenable to computer analysis. The next task was to investigate methods to transform procedures into a structured representation. The use of natural language techniques to read and compile the procedure documents appears to be viable for this purpose and supports conformity to guidelines. The final task was to consider possibilities of automated verification methods for procedures. Methods to help verify procedures were defined and information requirements specified. These methods take the structured representation of procedures as input. The software system being constructed in this project is called PASS, standing for Procedures Analysis Software System

  9. Experimental facilities for PEC reactor design central channel test loop: CPC-1 - thermal shocks loop: CEDI

    International Nuclear Information System (INIS)

    Calvaresi, C.; Moreschi, L.F.

    1983-01-01

    PEC (Prova Elementi di Combustibile: Fuel Elements Test) is an experimental fast sodium-cooled reactor with a power of 120 MWt. This reactor aims at studying the behaviour of fuel elements under thermal and neutron conditions comparable with those existing in fast power nuclear facilities. Given the particular structure of the core, the complex operations to be performed in the transfer cell and the strict operating conditions of the central channel, two experimental facilities, CPC-1 and CEDI, have been designed as a support to the construction of the reactor. CPC-1 is a 1:1 scale model of the channel, transfer-cell and loop unit of the channel, whereas CEDI is a sodium-cooled loop which enables to carry out tests of isothermal endurance and thermal shocks on the group of seven forced elements, by simulating the thermo-hydraulic and mechanical conditions existing in the reactor. In this paper some experimental test are briefy discussed and some facilities are listed, both for the CPC-1 and for the CEDI. (Auth.)

  10. Phased Startup Initiative Phase 3 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, loaded into the Primary Clean Machine (PCM) for fuel cleaning, fuel sorted on the Process Table, then loaded back into fuel canisters and relocated in Basin Storage. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a base line to predict the effectiveness of equipment design for control of contamination and visibility during production operation

  11. Phased Startup Initiative Phase 3 and 4 Test Procedure (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test procedure is to safely operate the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) with specific fuel canisters, and show that canisters containing fuel can be retrieved from the canister queue, decapped in the Canister Decapper, and loaded into the Primary Clean Machine (PCM) for fuel cleaning; and that fuel can be sorted on the Process Table, then loaded back into fuel canisters and relocated in basin storage. An option is included to load selected elements into multi-canister overpack (MCO) Fuel Baskets. Additional Data are collected during this test, beyond that collected during production operations. These data support qualifying the cleaning performance of the PCM, assessing the quantity of scrap generated during the cleaning, and evaluating the impact of fuel retrieval operations on the Basin water quality. The additional data collected primarily consist of weighing fuel and scrap at selected points in the operation, as well as photographing fuel and scrap as it is processed. The time to perform operations is also monitored for comparison with design predictions. Water quality data are collected to establish a baseline to predict the effectiveness of equipment design for control of contamination and visibility during production operation

  12. Expose : procedure and results of the joint experiment verification tests

    Science.gov (United States)

    Panitz, C.; Rettberg, P.; Horneck, G.; Rabbow, E.; Baglioni, P.

    The International Space Station will carry the EXPOSE facility accommodated at the universal workplace URM-D located outside the Russian Service Module. The launch will be affected in 2005 and it is planned to stay in space for 1.5 years. The tray like structure will accomodate 2 chemical and 6 biological PI-experiments or experiment systems of the ROSE (Response of Organisms to Space Environment) consortium. EXPOSE will support long-term in situ studies of microbes in artificial meteorites, as well as of microbial communities from special ecological niches, such as endolithic and evaporitic ecosystems. The either vented or sealed experiment pockets will be covered by an optical filter system to control intensity and spectral range of solar UV irradiation. Control of sun exposure will be achieved by the use of individual shutters. To test the compatibility of the different biological systems and their adaptation to the opportunities and constraints of space conditions a profound ground support program has been developed. The procedure and first results of this joint Experiment Verification Tests (EVT) will be presented. The results will be essential for the success of the EXPOSE mission and have been done in parallel with the development and construction of the final hardware design of the facility. The results of the mission will contribute to the understanding of the organic chemistry processes in space, the biological adaptation strategies to extreme conditions, e.g. on early Earth and Mars, and the distribution of life beyond its planet of origin.

  13. Testing and qualification of confidence in statistical procedures

    Energy Technology Data Exchange (ETDEWEB)

    Serghiuta, D.; Tholammakkil, J.; Hammouda, N. [Canadian Nuclear Safety Commission (Canada); O' Hagan, A. [Sheffield Univ. (United Kingdom)

    2014-07-01

    tests, but targeted to the context of the particular application and aimed at identifying the domain of validity of the proposed tolerance limit method and algorithm, might provide the necessary confidence in the proposed statistical procedure. The Ontario Power Generation, Bruce Power and AMEC-NSS have supported this work and contributed to the development and execution of the test cases. Their statistical method and results are not, however, discussed in this paper. (author)

  14. Research on signal processing of shock absorber test bench based on zero-phase filter

    Science.gov (United States)

    Wu, Yi; Ding, Guoqing

    2017-10-01

    The quality of force-displacement diagram is significant to help evaluate the performance of shock absorbers. Damping force sampling data is often interfered by Gauss white noise, 50Hz power interference and its harmonic wave during the process of testing; data de-noising has become the core problem of drawing true, accurate and real-time indicator diagram. The noise and interference can be filtered out through generic IIR or FIR low-pass filter, but addition phase lag of useful signal will be caused due to the inherent attribute of IIR and FIR filter. The paper uses FRR method to realize zero-phase digital filtering in a software way based on mutual cancellation of phase lag between the forward and reverse sequences after through the filter. High-frequency interference above 40Hz are filtered out completely and noise attenuation is more than -40dB, with no additional phase lag. The method is able to restore the true signal as far as possible. Theoretical simulation and practical test indicate high-frequency noises have been effectively inhibited in multiple typical speed cases, signal-to-noise ratio being greatly improved; the curve in indicator diagram has better smoothness and fidelity. The FRR algorithm has low computational complexity, fast running time, and can be easily transplanted in multiple platforms.

  15. The Hydraulic Test Procedure for Non-instrumented Irradiation Test Rig of Annular Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dae Ho; Lee, Kang Hee; Shin, Chang Hwan; Park, Chan Kook

    2008-08-15

    This report presents the procedure of pressure drop test, vibration test and endurance test for the non-instrumented rig using the irradiation test in HANARO of advanced PWR annular fuel which were designed and fabricated by KAERI. From the out-pile thermal hydraulic tests, confirm the flow rate at the 200 kPa pressure drop and measure the RMS displacement at this time. And the endurance test is confirmed the wear and the integrity of the non-instrumented rig at the 110% design flow rate. This out-pile test perform the Flow-Induced Vibration and Pressure Drop Experimental Tester(FIVPET) facility. The instruments in FIVPET facility was calibrated in KAERI and the pump and the thermocouple were certified by manufacturer.

  16. Frequency modulation system test procedure shuttle task 501 approach and landing test configuration

    Science.gov (United States)

    Doland, G. D.

    1976-01-01

    Shuttle Task 501 is an in-line task to test the performance and compatibility of radiofrequency links between the SSO and ground, and relay via a satellite. Under Shuttle Task 501 approach and landing test (ALT) phase only a limited portion of the communication and tracking (C&T) equipment is to be tested. The principal item to be tested is a frequency modulated (FM) data link. To test this RF link, an ALT FM System was designed, constructed, and the console wiring verified. A step-by-step procedure to be used to perform the ALT FM system is presented. The ALT FM system test is to be performed prior to delivery of the equipment to the Electronic Systems Test Laboratory (ESTL).

  17. CANFLEX fuel bundle cross-flow endurance test 2 (test procedure)

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sung Deok; Chung, C. H.; Chang, S. K. [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-04-01

    This report describes test procedure of cross-flow 2 test for CANFLEX fuel. In October 1996. a cross-flow test was successfully performed in the KAERI Hot Test Loop for four hours at a water flow rate of 31kg/s, temperature of 266 deg C and inlet pressure of 11MPa, but it is requested more extended time periods to determine a realistic operational margin for the CANFLEX bundle during abnormal refuelling operations. The test shall be conducted for twenty two hours under the reactor conditions. After an initial period of ten hours, the test shall be stopped at the intervals of four hours for bundle inspection and inspect the test bundle end-plate to end-cap welds for failure or crack propagation using liquid penetrant examination. 2 refs., 1 fig. (Author)

  18. The Shock and Vibration Bulletin. Part 3. Vibration Testing, Instrumentation and Data Analysis, Loads and Environments.

    Science.gov (United States)

    1977-09-01

    procedure previously described cannot be K’. 1,. , .L" - Initialize ..’.:_"....- _-’ __- array IRAN ( NLINE = number of . . Pseudo- spectral lines) IRAN(K...random---- Inumber " ..-. ’.: •.-.-. 1 , NACT ...-- T - • - - Convert to complex K 1 , NLINE and randot..ize the phase of each spectral line of the...sensitivity and calibration while installed in the test set-up. THE COMPONENTS OF THE SYSTEM.- There is available on the market , a photo- - diode which

  19. Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing

    Science.gov (United States)

    2018-04-27

    Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 08-2-188 Chemical Point Detector Vapor Testing 5a. CONTRACT...NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING...ORGANIZATION NAME(S) AND ADDRESS(ES) US Army Dugway Proving Ground West Desert Test Center (TEDT-DPW) Dugway, UT 84022-5000 8. PERFORMING ORGANIZATION

  20. 78 FR 75961 - Energy Conservation Program: Test Procedures for Electric Motors

    Science.gov (United States)

    2013-12-13

    ... Conservation Program: Test Procedures for Electric Motors; Final Rule #0;#0;Federal Register / Vol. 78 , No... Procedures for Electric Motors AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy... procedures for electric motors to allow currently unregulated motors to be tested by clarifying the test...

  1. 77 FR 74559 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters...

    Science.gov (United States)

    2012-12-17

    ... Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters, Direct Heating... Energy (DOE) is amending its test procedures for residential water heaters, direct heating equipment (DHE... necessary for residential water heaters, because the existing test procedures for those products already...

  2. 76 FR 56347 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters...

    Science.gov (United States)

    2011-09-13

    ... Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters, Direct Heating... proposed to amend, where appropriate, its test procedures for residential water heaters, direct heating... notes that the test procedure and metric for residential water heaters currently address and incorporate...

  3. 78 FR 41609 - Energy Conservation Program for Consumer Products: Test Procedures for Refrigerators...

    Science.gov (United States)

    2013-07-10

    ... September 14, 1977. 42 FR 46140. Industry representatives viewed these test procedures as too complex and... Freezers'' (HRF-1- 1979). Using this industry-created test procedure, DOE revised its test procedures on... compartment of such a product to be at a level that would effectively exclude the coverage of combination wine...

  4. Test plan/procedure for the SPM-1 shipping container system. Revision 0

    International Nuclear Information System (INIS)

    Flanagan, B.D.

    1995-01-01

    The 49 CFR 173.465 Type A packaging tests will verify that SPM-1 will provide adequate protection and pass as a Type A package. Test will determine that the handle of the Pig will not penetrate through the plywood spacer and rupture the shipping container. Test plan/procedure provides planning, pre-test, setup, testing, and post-testing guidelines and procedures for conducting the open-quotes Free Drop Testclose quotes procedure for the SPM-1 package

  5. Fragmentation of Solid Materials Using Shock Tubes. Part 2: First Test Series in a Large Diameter Shock Tube

    Science.gov (United States)

    2017-12-01

    series used improved experimental techniques to reduce obscuration due to smoke and fire which, again, increased the number of observed fragments (iii...minimally-reinforced concrete masonry unit (CMU) wall, and one 8-ft x 8-ft reinforced concrete panel, each carefully fabricated and mounted to replicate...develops a vertical compressive force that resists horizontal flexure. Figure 4. A view of CMU sample set-up used in Test 20. 6 Figure 5

  6. Life Shocks and Crime: A Test of the “Turning Point” Hypothesis

    Science.gov (United States)

    Noonan, Kelly; Reichman, Nancy E.; Schwartz-Soicher, Ofira

    2012-01-01

    Other researchers have posited that important events in men’s lives—such as employment, marriage, and parenthood—strengthen their social ties and lead them to refrain from crime. A challenge in empirically testing this hypothesis has been the issue of self-selection into life transitions. This study contributes to this literature by estimating the effects of an exogenous life shock on crime. We use data from the Fragile Families and Child Wellbeing Study, augmented with information from hospital medical records, to estimate the effects of the birth of a child with a severe health problem on the likelihood that the infant’s father engages in illegal activities. We conduct a number of auxiliary analyses to examine exogeneity assumptions. We find that having an infant born with a severe health condition increases the likelihood that the father is convicted of a crime in the three-year period following the birth of the child, and at least part of the effect appears to operate through work and changes in parental relationships. These results provide evidence that life events can cause crime and, as such, support the “turning point” hypothesis. PMID:21660628

  7. Life shocks and crime: a test of the "turning point" hypothesis.

    Science.gov (United States)

    Corman, Hope; Noonan, Kelly; Reichman, Nancy E; Schwartz-Soicher, Ofira

    2011-08-01

    Other researchers have posited that important events in men's lives-such as employment, marriage, and parenthood-strengthen their social ties and lead them to refrain from crime. A challenge in empirically testing this hypothesis has been the issue of self-selection into life transitions. This study contributes to this literature by estimating the effects of an exogenous life shock on crime. We use data from the Fragile Families and Child Wellbeing Study, augmented with information from hospital medical records, to estimate the effects of the birth of a child with a severe health problem on the likelihood that the infant's father engages in illegal activities. We conduct a number of auxiliary analyses to examine exogeneity assumptions. We find that having an infant born with a severe health condition increases the likelihood that the father is convicted of a crime in the three-year period following the birth of the child, and at least part of the effect appears to operate through work and changes in parental relationships. These results provide evidence that life events can cause crime and, as such, support the "turning point" hypothesis.

  8. Performance simulations of catalytic converters during the Federal Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    Shen, H.; Shamim, T.; Sengupta, S.; Son, S.; Adamczyk, A.A.

    1999-07-01

    A numerical study is carried out to predict the tailpipe emissions and emission conversion efficiencies of unburned hydrocarbon, nitrogen oxide and carbon monoxide flowing through a catalytic converter during the Federal Test Procedure (FTP). The model considers the effect of heat transfer in the catalytic converter, coupled with catalyst chemical kinetics, including an oxygen storage mechanism. The resulting governing equations based on the conservation of mass and energy are solved by a tridiagonal matrix algorithm (TDMA) with a successive line under relaxation method. The numerical scheme for this non-linear problem is found to have good convergence efficiency. The simulation for the complete FTP cycle is accomplished in less than fifteen minutes on a desktop personal computer. A 13-step reaction mechanism plus a nine-step O{sub 2} storage mechanism is used to simulate the chemical kinetics. The energy equations include the heat loss due to conduction and convection plus the energy liberated by chemical reactions. The effect of radiation is assumed to be negligible and is not considered. The results of the numerical model for both the instantaneous and accumulated emissions are found to be in good agreement with experimental measurements. The conversion efficiencies of HC, CO and NO as predicted by the model are found to be within 5% of those dynamic measurements, and calculated results of accumulated HC, CO and NO{sub x} are in fair agreement with experimental measurements. The transient measurements are also used to check the robustness of the numerical model. The model is found to be robust and hence can simulate various operating conditions of engine output to the converter.

  9. Analysis and testing of an inner bypass magnetorheological damper for shock and vibration mitigation

    Science.gov (United States)

    Bai, Xian-Xu; Hu, Wei; Wereley, Norman M.

    2013-04-01

    Aiming at fundamentally improving the performance of MR dampers, including maximizing dynamic range (i.e., ratio of field-on to field-off damping force) while simultaneously minimizing field-off damping force, this study presents the principle of an inner bypass magnetorheological damper (IBMRD). The IBMRD is composed of a pair of twin tubes, i.e., the inner tube and outer concentric tube, a movable piston-shaft arrangement, and an annular MR fluid flow gap sandwiched between the concentric tubes. In the IBMRD, the inner tube serves simultaneously as the guide for the movable piston and the bobbin for the electromagnetic coil windings, and five active rings on the inner tube, annular MR fluid flow gap, and outer tube forms five closed magnetic circuits. The annular fluid flow gap is an inner bypass annular valve where the rheology of the MR fluids, and hence the damping force of the MR damper, is controlled. Based on the structural principle of the IBMRD, the IBMRD is configured and its finite element analysis (FEA) is implemented. After theoretically constructing the hydro-mechanical model for the IBMRD, its mathematical model is established using a Bingham-plastic nonlinear fluid model. The characteristics of the IBMRD are theoretically evaluated and compared to those of a conventional piston-bobbin MR damper with an identical active length and cylinder diameter. In order to validate the theoretical results predicted by the mathematical model, the prototype IBMRD is designed, fabricated, and tested. The servo-hydraulic testing machine (type: MTS 810) and rail-guided drop tower are used to provide sinusoidal displacement excitation and shock excitation to the IBMRD, respectively.

  10. TMACS test procedure TP005: Sensor configuration, logging, and data conversion. Revision 4

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the sensor configuration, conversion and logging requirements of the TMACS. The features to be tested are as follows: sensor configuration data; conversion of continuous sensor data to engineering units; conversion of digital data to discrete states; discrete sensor data logging; and continuous sensor data logging

  11. Weld Design, Testing, and Assessment Procedures for High Strength Pipelines

    Science.gov (United States)

    2011-12-20

    Long-distance high-strength pipelines are increasingly being constructed for the efficient transportation of energy products. While the high-strength linepipe steels and high productivity welding processes are being applied, the procedures employed f...

  12. AIChe equipment testing procedure centrifugal compressors : a guide to performance evaluation and site testing

    CERN Document Server

    AIChE

    2013-01-01

    With its engineer-tested procedures and thorough explanations, Centrifugal Compressors is an essential text for anyone engaged in implementing new technology in equipment design, identifying process problems, and optimizing equipment performance.  This condensed book presents a step by step approach to preparing for, planning, executing, and analyzing tests of centrifugal compressors, with an emphasis on methods that can be conducted on-site and with an acknowledgement of the strengths and limitations of these methods. The book opens with an extensive and detailed section offering definitions

  13. Leach test of six 192-iridium pellets based on the IAEA 'special form' test procedures

    International Nuclear Information System (INIS)

    Gordon, G.; Gerdingh, R.

    1981-07-01

    The designation 'special form' may be applied to indispersible solid radioactive material if the material meets the requirements of the tests described in the International Atomic Energy Agency Regulations for the Safe Transport of Radioactive Type Materials. This report presents the procedures and results of a leach test performed as specified in the regulations on 6 'as received' active 192-iridium pellets. Mechanical tests were not carried out prior to or following the leach test. The activity of each of the first 6 water baths was found to be between 2.3 and 12.6 μCi, (8.5 x 10 4 and 4.7 x 10 5 Bq) and of the second 6, between 1.3 to 6.0 μCi, (4.8 x 10 4 to 2.2 x 10 5 Bq) thus exceeding the allowable limit

  14. 77 FR 49063 - Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products

    Science.gov (United States)

    2012-08-15

    ... Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products; Proposed...-AC01 Energy Conservation Program: Test Procedures for Residential Dishwashers and Cooking Products... procedures for both dishwashers and conventional cooking products for the measurement of energy use in fan...

  15. New test of bow-shock models of Herbig-Haro objects

    International Nuclear Information System (INIS)

    Raga, A.C.; Bohm, K.H.; Solf, J.; Max-Planck-Institut fuer Astronomie, Heidelberg, West Germany)

    1986-01-01

    Long-slit, high-resolution spectroscopy of the Herbig-Haro oject HH 32 has shown that the emission-line profiles in all four condensations A, B, C, and D show high- and low-velocity components. The spatial maxima of these two components are always arranged in a double-layer pattern, with the maximum of the high-velocity component 0.6-1.0 arcsecs closer to the central star (AS 353A) than the low-velocity maximum. A study of the emission-line profiles predicted from a model of a radiating bow shock shows that such a double-layer structure appears naturally for this type of flow. In this case both the high-velocity and the low-velocity components come from the post-shock gas, in agreement with the theoretical prediction that it should be very difficult to detect the pre-shock gas observationally. The present results agree qualitatively well with observations of HH 32, strengthening the case for a bow-shock interpretation of this Herbig-Haro object. It is shown that the double-layer effect will be more easily observable for bow shocks which move at a relatively large angle with respect to the plane of the sky (i.e., for Herbig-Haro objects which have large radial velocities). 31 references

  16. Temperatures, strains and crack behavior during local thermal shock tests on the RPV-cylinder of the HDR

    International Nuclear Information System (INIS)

    Neubrech, G.E.; Goerner, F.; Siebler, T.

    1987-01-01

    This report summarises and critically discusses the results obtained from thermal shocks locally applied to the inner surface of the RPV-cylinder. This evaluation is based on on-line measurements (temperatures and strains at the RPV-wall during the thermal shock loading, non-destructive-testing), on materials investigations, and on theoretical investigations (finite element calculations, fracture mechanics analyses). The comparison between the corresponding measured and calculated results serves as a basis for subsequent assessments. It was the object of these tests to achieve the following primary aims: - Investigation of the loading conditions produced by local thermal shocks during realistic cooling processes. - A better understanding of the physical processes involved in crack initiation and propagation resulting from thermocyclic loading. - Assessment of non-destructive-testing methods with respect to detection and analysis of cracks as a basis for fracture mechanical evaluations. - Assessment of the reliability of the applied structural analysis methods. - Production of naturally formed deep cracks on the inner surface of the RPV-cylinder by means of excessive cooling processes. (orig./HP)

  17. 77 FR 28519 - Test Procedure Guidance for Room Air Conditioners, Residential Dishwashers, and Residential...

    Science.gov (United States)

    2012-05-15

    ... Guidance for Room Air Conditioners, Residential Dishwashers, and Residential Clothes Washers: Public... procedures for room air conditioners, residential dishwashers, and residential clothes washers. DATES: DOE...'s existing test procedures for residential room air conditioners, residential dishwashers, and...

  18. Designing and testing computer based screening engine for severe sepsis/septic shock.

    Science.gov (United States)

    Herasevich, V; Afessa, B; Chute, C G; Gajic, O

    2008-11-06

    This study addresses the role of a sepsis "sniffer", an automatic screening tool for the timely identification of patients with severe sepsis/septic shock, based electronic medical records. During the two months prospective implementation in a medical intensive care unit, 37 of 320 consecutive patients developed severe sepsis/septic shock. The sniffer demonstrated a sensitivity of 48% and specificity of 86%, and positive predictive value 32%. Further improvements are needed prior to the implementation of sepsis sniffer in clinical practice and research.

  19. 40 CFR 60.583 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Flexible Vinyl... following procedures: (1) Determine and record the VOC content and amount of each ink used at the print head...' formulation data along with plant blending records (if plant blending is done) may be used to determine VOC...

  20. Operability test procedure for the TK-900 effluent monitoring station

    International Nuclear Information System (INIS)

    Weissenfels, R.D.

    1994-01-01

    This procedure will verify that the 221-B liquid effluent monitoring system, installed near the east end of the 6-in. chemical sewer header, functions as intended by design. TK-900B was installed near stairwell 3 in the 221-B electrical gallery by Project W-007H. The system is part of BAT/AKART for the BCE liquid effluent system

  1. 40 CFR 610.64 - Track test procedures.

    Science.gov (United States)

    2010-07-01

    ... truck or trailer. (4) Fuel economy will be determined by either a gravimetric or volumetric method. (c... dynamometer except that fuel economy will be measured by gravimetric or volumetric methods. ... either a volumetric or gravimetric procedure approved by the Administrator. (5) Vehicle speed and...

  2. Operability test procedure for the Rotary Mode Core Sampling System Exhausters 3 and 4

    International Nuclear Information System (INIS)

    WSaldo, E.J.

    1995-01-01

    This document provides a procedure for performing operability testing of the Rotary Mode Core Sampling System Exhausters 3 ampersand 4. Upon completion of testing activities an operability testing report will be issued

  3. SFC/SFBMN guidelines update for nuclear cardiology procedures: stress testing in adults and children

    International Nuclear Information System (INIS)

    Manrique, A.; Marie, P.Y.; Maunoury, Ch.; Acar, Ph.; Agostini, D.

    2002-01-01

    The guidelines update for nuclear cardiology procedures are studied in this article. We find the minimum technique conditions for the stress testing practice, the recommendations for the different ischemia activation tests, the choice of the stress test. (N.C.)

  4. Frequency and Prognostic Significance of Abnormal Liver Function Tests in Patients With Cardiogenic Shock

    DEFF Research Database (Denmark)

    Jäntti, Toni; Tarvasmäki, Tuukka; Harjola, Veli Pekka

    2017-01-01

    Cardiogenic shock (CS) is a cardiac emergency often leading to multiple organ failure and death. Assessing organ dysfunction and appropriate risk stratification are central for the optimal management of these patients. The purpose of this study was to assess the prevalence of abnormal liver funct...

  5. The minimal ice water caloric test compared with established vestibular caloric test procedures.

    Science.gov (United States)

    Schmäl, Frank; Lübben, Björn; Weiberg, Kerstin; Stoll, Wolfgang

    2005-01-01

    Caloric testing of the vestibular labyrinth is usually performed by classical caloric test procedures (CCTP) using water warmed to 30 degrees C and 44 degrees C. Ice water irrigation (4 degrees C) is usually not performed, although it might be useful as a bedside test. To verify the validity of the Minimal Ice Water Caloric Test (MIWCT), comparative video-oculographic investigations were performed in 22 healthy subjects using ice water (0.5 ml, 1.0 ml, 2 ml), CCTP, and cold air (27 degrees C). Frequency, amplitude, slow phase velocity (SPV), the onset, and the duration of nystagmus were documented. After addition of three ice cubes, the temperature of conventional tap water (16 degrees C) fell within 13 min to 4 degrees C. In pessimum position the subjects demonstrated no nystagmus response. Compared to CCTP, MIWCT was associated with a significantly later onset of nystagmus and a significant prolongation of the nystagmus reaction. In contrast to air stimulation (27 degrees C), a significant Spearman's correlation was noted between MIWCT (1 and 2 ml) and established CCTP in respect of essential nystagmus parameters (frequency, amplitude and SPV). Furthermore, MIWCT (0.5 and 1 ml) showed a higher sensitivity and specificity with regard to the detection of canal paresis based on Jongkees' formula compared to stimulation with air 27 degrees C. Thus, MIWCT appears to be a suitable procedure for bedside investigation of vestibular function outside the vestibular laboratory, e.g. in a hospital ward, where bedridden patients with vertigo occasionally require vestibular testing.

  6. 46 CFR 164.008-3 - Testing procedure.

    Science.gov (United States)

    2010-10-01

    ... control. (1) The furnace temperature shall be determined by at least four mineral insulated thermocouples... further definition of the time-temperature curve, see Appendix I of the ASTM Standard E119, “Fire Tests of... openings are formed during the test, an ignition test as prescribed in § 164.008-4(b) shall take place...

  7. A minimax procedure in the context of sequential mastery testing

    NARCIS (Netherlands)

    Vos, Hendrik J.

    1999-01-01

    The purpose of this paper is to derive optimal rules for sequential mastery tests. In a sequential mastery test, the decision is to classify a subject as a master or a nonmaster, or to continue sampling and administering another random test item. The framework of minimax sequential decision theory

  8. A NOTE ON THE CONVENTIONAL OUTLIER DETECTION TEST PROCEDURES

    Directory of Open Access Journals (Sweden)

    JIANFENG GUO

    Full Text Available Under the assumption of that the variance-covariance matrix is fully populated, Baarda's w-test is turn out to be completely different from the standardized least-squares residual. Unfortunately, this is not generally recognized. In the limiting case of only one degree of freedom, all the three types of test statistics, including Gaussian normal test, Student's t-test and Pope's Tau-test, will be invalid for identification of outliers: (1 all the squares of the Gaussian normal test statistic coincide with the goodness-of-fit (global test statistic, even for correlated observations. Hence, the failure of the global test implies that all the observations will be flagged as outliers, and thus the Gaussian normal test is inconclusive for localization of outliers; (2 the absolute values of the Tau-test statistic are all exactly equal to one, no matter whether the observations are contaminated. Therefore, the Tau-test cannot work for outlier detection in this situation; and (3 Student's t-test statistics are undefined.

  9. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    HOLM, M.J.

    1999-01-01

    This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver devices. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  10. Results of molten salt panel and component experiments for solar central receivers: Cold fill, freeze/thaw, thermal cycling and shock, and instrumentation tests

    Energy Technology Data Exchange (ETDEWEB)

    Pacheco, J.E.; Ralph, M.E.; Chavez, J.M.; Dunkin, S.R.; Rush, E.E.; Ghanbari, C.M.; Matthews, M.W.

    1995-01-01

    Experiments have been conducted with a molten salt loop at Sandia National Laboratories in Albuquerque, NM to resolve issues associated with the operation of the 10MW{sub e} Solar Two Central Receiver Power Plant located near Barstow, CA. The salt loop contained two receiver panels, components such as flanges and a check valve, vortex shedding and ultrasonic flow meters, and an impedance pressure transducer. Tests were conducted on procedures for filling and thawing a panel, and assessing components and instrumentation in a molten salt environment. Four categories of experiments were conducted: (1) cold filling procedures, (2) freeze/thaw procedures, (3) component tests, and (4) instrumentation tests. Cold-panel and -piping fill experiments are described, in which the panels and piping were preheated to temperatures below the salt freezing point prior to initiating flow, to determine the feasibility of cold filling the receiver and piping. The transient thermal response was measured, and heat transfer coefficients and transient stresses were calculated from the data. Freeze/thaw experiments were conducted with the panels, in which the salt was intentionally allowed to freeze in the receiver tubes, then thawed with heliostat beams. Slow thermal cycling tests were conducted to measure both how well various designs of flanges (e.g., tapered flanges or clamp type flanges) hold a seal under thermal conditions typical of nightly shut down, and the practicality of using these flanges on high maintenance components. In addition, the flanges were thermally shocked to simulate cold starting the system. Instrumentation such as vortex shedding and ultrasonic flow meters were tested alongside each other, and compared with flow measurements from calibration tanks in the flow loop.

  11. A testing procedure for wind turbine generators based on the power grid statistical model

    DEFF Research Database (Denmark)

    Farajzadehbibalan, Saber; Ramezani, Mohammad Hossein; Nielsen, Peter

    2017-01-01

    In this study, a comprehensive test procedure is developed to test wind turbine generators with a hardware-in-loop setup. The procedure employs the statistical model of the power grid considering the restrictions of the test facility and system dynamics. Given the model in the latent space...

  12. 40 CFR 1051.501 - What procedures must I use to test my vehicles or engines?

    Science.gov (United States)

    2010-07-01

    ... vehicles or engines? 1051.501 Section 1051.501 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM RECREATIONAL ENGINES AND VEHICLES Test Procedures § 1051.501 What procedures must I use to test my vehicles or engines? This section describes test...

  13. Test procedures, AN/AIC-27 system and component units. [for space shuttle

    Science.gov (United States)

    Reiff, F. H.

    1975-01-01

    The AN/AIC-27 (v) intercommunication system is a 30-channel audio distribution which consists of: air crew station units, maintenance station units, and a central control unit. A test procedure for each of the above units and also a test procedure for the system are presented. The intent of the test is to provide data for use in shuttle audio subsystem design.

  14. 10 CFR 431.193 - Test procedures for measuring energy consumption of distribution transformers.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for measuring energy consumption of distribution transformers. 431.193 Section 431.193 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY... § 431.193 Test procedures for measuring energy consumption of distribution transformers. The test...

  15. 9 CFR 147.8 - Procedures for preparing egg yolk samples for diagnostic tests.

    Science.gov (United States)

    2010-01-01

    ... samples for diagnostic tests. 147.8 Section 147.8 Animals and Animal Products ANIMAL AND PLANT HEALTH... IMPROVEMENT PLAN Blood Testing Procedures § 147.8 Procedures for preparing egg yolk samples for diagnostic... for diagnostic testing. (b) The authorized laboratory must identify each egg as to the breeding flock...

  16. 77 FR 28805 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2012-05-16

    ... Energy Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and... (SNOPR) to amend the test procedures for microwave ovens. That SNOPR proposed amendments to the DOE test... mode energy use of products that combine a microwave oven with other appliance functionality, as well...

  17. An on-road shock and vibration response test series utilizing worst case and statistical analysis techniques

    International Nuclear Information System (INIS)

    Cap, J.S.

    1997-01-01

    Defining the maximum expected shock and vibration responses for an on-road truck transportation environment is strongly dependent on the amount of response data that can be obtained. One common test scheme consists of measuring response data over a relatively short prescribed road course and then reviewing that data to obtain the maximum response levels. The more mathematically rigorous alternative is to collect an unbiased ensemble of response data during a long road trip. This paper compares data gathered both ways during a recent on-road certification test for a tractor trailer van being designed by Sandia

  18. High-Frequency Axial Fatigue Test Procedures for Spectrum Loading

    Science.gov (United States)

    2016-07-20

    cycle runout limit. PURPOSE 2. To develop the capability to perform High-Frequency (H-F) Spectrum Fatigue tests, an in- house Basic and...response of the test specimen to the command input signal for load cycling . These cycle -by- cycle errors accumulate over the life of the test specimen...fatigue life model. It is expected that the cycle -by- cycle P-V error may vary substantially depending on the load spectrum content, the compensation

  19. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    BARNES, D.A.

    2000-06-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  20. NNWSI Phase II materials interaction test procedure and preliminary results

    International Nuclear Information System (INIS)

    Bates, J.K.; Gerding, T.J.

    1985-01-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) project is investigating the volcanic tuff beds of Yucca Mountain, Nevada, as a potential location for a high-level radioactive waste repository. This report describes a test method (Phase II) that has been developed to measure the release of radionuclides from the waste package under simulated repository conditions, and provides information on materials interactions that may occur in the repository. The results of 13 weeks of testing using the method are presented, and an analog test is described that investigates the relationship between the test method and expected repository conditions. 9 references, 10 figures, 11 tables

  1. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    BARNES, D.A.

    2000-01-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  2. A system for personnel qualification of non-destructive testing procedures from testing and and qualification system in Sweden

    International Nuclear Information System (INIS)

    Kuna, M.; Kubis, S.; Plasek, J.

    1999-01-01

    The method for qualification of non-destructive testing personnel carrying out inspections by means of ultrasonic and eddy-current tests to inspect cladding in BWR reactor pressure vessel and core shroud lid. Development of procedures tests with real artificial cracks, blind tests. Evaluation of results by the Swedish Qualification Commission. Performance of the tests at Oskarshamn-1

  3. Development of Drop/Shock Test in Microelectronics and Impact Dynamic Analysis for Uniform Board Response

    Science.gov (United States)

    Kallolimath, Sharan Chandrashekar

    For the past several years, many researchers are constantly developing and improving board level drop test procedures and specifications to quantify the solder joint reliability performance of consumer electronics products. Predictive finite element analysis (FEA) by utilizing simulation software has become widely acceptable verification method which can reduce time and cost of the real-time test process. However, due to testing and metrological limitations it is difficult not only to simulate exact drop condition and capture critical measurement data but also tedious to calibrate the system to improve test methods. Moreover, some of the important ever changing factors such as board flexural rigidity, damping, drop height, and drop orientation results in non-uniform stress/strain distribution throughout the test board. In addition, one of the most challenging tasks is to quantify uniform stress and strain distribution throughout the test board and identify critical failure factors. The major contributions of this work are in the four aspects of the drop test in electronics as following. First of all, an analytical FEA model was developed to study the board natural frequencies and responses of the system with the consideration of dynamic stiffness, damping behavior of the material and effect of impact loading condition. An approach to find the key parameters that affect stress and strain distributions under predominate mode responses was proposed and verified with theoretical solutions. Input-G method was adopted to study board response behavior and cut boundary interpolation methods was used to analyze local model solder joint stresses with the development of global/local FEA model in ANSYS software. Second, no ring phenomenon during the drop test was identified theoretically when the test board was modeled as both discrete system and continuous system. Numerical analysis was then conducted by FEA method for detailed geometry of attached chips with solder

  4. Evaluation of Surface Infiltration Testing Procedures in Permeable Pavement Systems

    Science.gov (United States)

    The ASTM method (ASTM C1701) for measuring infiltration rate of in-place pervious concrete provides limited guidance on how to select testing locations, so research is needed to evaluate how testing sites should be selected and how results should be interpreted to assess surface ...

  5. 40 CFR 600.111-93 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... cycle. (g) Engine starting and restarting. (1) If the engine is not running at the initiation of the... action. (h) Dynamometer test run. The following steps must be taken for each test: (1) Place the drive... controlling high tire or brake temperatures during dynamometer operation. (3) Preparation of the CVS must be...

  6. 40 CFR 51.357 - Test procedures and standards.

    Science.gov (United States)

    2010-07-01

    ... following steps: (i) Test equipment shall be connected to the fuel tank canister hose at the canister end... minutes and monitor for a sudden pressure drop, indicating that the fuel tank was pressurized. (v) The... be performed without repair or adjustment at the inspection facility, prior to the test, except as...

  7. 16 CFR 1209.5 - Test procedures for corrosiveness.

    Science.gov (United States)

    2010-01-01

    ... to eliminate air pockets from forming next to the metal coupons. (5) Do not cover the crystallizing... bristle brush or equivalent to remove loose corrosion products. Remove the remaining corrosion products... Evaluating Corrosion Test Specimens,” published by American Society for Testing and Materials, 1916 Race...

  8. 16 CFR 1700.20 - Testing procedure for special packaging.

    Science.gov (United States)

    2010-01-01

    ... packages shall be tested at room temperature. (2) Child test—(i) Test subjects—(A) Selection criteria. Use... be done in a location that is familiar to the children, for example, their customary nursery school... temperature. 3. Reclosable packages shall be opened and properly resecured one time (or more if appropriate...

  9. 40 CFR 90.404 - Test procedure overview.

    Science.gov (United States)

    2010-07-01

    ... mode and five power modes at one speed (rated or intermediate). The test cycle for Class I-A, III, IV... measurement device. The exhaust gases generated during engine operation are sampled either raw or dilute and... fuel consumption. For Phase 2 Class I-B, Class I, and Class II natural gas fueled engines the test is...

  10. 40 CFR 63.425 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... maximum allowable 5-minute pressure increase is 130 mm H2 O (5 in. H2 O). (f) Leak detection test. The leak detection test shall be performed using Method 21, appendix A, 40 CFR part 60, except omit section... between each leak detection. The duration of the purge shall be in excess of two instrument response times...

  11. 40 CFR 63.1046 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ...) National Emission Standards for Oil-Water Separators and Organic-Water Separators § 63.1046 Test methods... vapor leakage could occur) on the cover and associated closure devices shall be checked. Potential leak... test, the cover and closure devices shall be secured in the closed position. (3) The detection...

  12. A procedure for empirical initialization of adaptive testing algorithms

    NARCIS (Netherlands)

    van der Linden, Willem J.

    1997-01-01

    In constrained adaptive testing, the numbers of constraints needed to control the content of the tests can easily run into the hundreds. Proper initialization of the algorithm becomes a requirement because the presence of large numbers of constraints slows down the convergence of the ability

  13. Equating Multidimensional Tests under a Random Groups Design: A Comparison of Various Equating Procedures

    Science.gov (United States)

    Lee, Eunjung

    2013-01-01

    The purpose of this research was to compare the equating performance of various equating procedures for the multidimensional tests. To examine the various equating procedures, simulated data sets were used that were generated based on a multidimensional item response theory (MIRT) framework. Various equating procedures were examined, including…

  14. Investigation into the comparative severity of practical thermal test procedures

    International Nuclear Information System (INIS)

    Shultz, K.R.; White, M.C.; Gordon, G.

    In the advisory material for the application of the IAEA Transport Regulations three methods for determining whether a type B radioactive material packaging can withstand hypothetical fire conditions are presented. These comprise an open fire test and two tests involving exposure of the packaging in a furnace. The first furnace test (method I) uses a materials testing type of furnace and the second (method II) uses a heat-treatment furnace. Under method I the packaging is heated for 35 minutes from ambient temperature by firing the furnace so that its temperature increases in accordance with an ISO standard fire curve; under method II the heating is for 30 minutes at 800 0 C. Tests were carried out to detarmine if these tests were of comparable severity, and on which temperature the control of furnace firing in method I should be based. It was concluded that method II was the more severe test, and that furance wall temperatues are the dominant factor in determining heat exchange to specimens in the furnaces used. Furnace walls should meet or exceed the standard fire curve set out in the ISO standard. The characteristics of the furnances and specimens were not sufficiently understood to be able to predict the behaviour of the specimens

  15. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    WANDLING, R.R.

    1999-01-01

    The purpose of this document is to describe tests performed to validate Revision 11.2 of the TMACS Monitor and Control System (TMCACS) and verify that the software functions as intended by design. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  16. Space Shuttle Program (SSP) Shock Test and Specification Experience for Reusable Flight Hardware Equipment

    Science.gov (United States)

    Larsen, Curtis E.

    2012-01-01

    As commercial companies are nearing a preliminary design review level of design maturity, several companies are identifying the process for qualifying their multi-use electrical and mechanical components for various shock environments, including pyrotechnic, mortar firing, and water impact. The experience in quantifying the environments consists primarily of recommendations from Military Standard-1540, Product Verification Requirement for Launch, Upper Stage, and Space Vehicles. Therefore, the NASA Engineering and Safety Center (NESC) formed a team of NASA shock experts to share the NASA experience with qualifying hardware for the Space Shuttle Program (SSP) and other applicable programs and projects. Several team teleconferences were held to discuss past experience and to share ideas of possible methods for qualifying components for multiple missions. This document contains the information compiled from the discussions

  17. MAC mini acceptance test procedure, software Version 3.0

    International Nuclear Information System (INIS)

    Russell, V.K.

    1994-01-01

    The K Basins Materials Accounting (MAC) programs had some major improvements made to it to organize the main-tables by Location, Canister, and Material. This ATP describes how the code was to be tested to verify its correctness

  18. Acceptance test procedure MICON software exhaust fan control modifications; TOPICAL

    International Nuclear Information System (INIS)

    SILVAN, G.R.

    1999-01-01

    This acceptance test verifies the MICON program changes for the new automatic transfer switch ATS-2 alarms, the Closed Loop Cooling isolator status, the CB-3 position alarm, and the alarms for the new emergency fan damper backup air compressor

  19. The Effect of Sample Preparation and Testing Procedure

    African Journals Online (AJOL)

    School of Civil & Environmental Engineering, Addis Ababa Institute of Technology,. 3. Murray Rix ... the application of laboratory testing and ... clay, tropical red clay, lateritic clay and laterite, ..... grading curves using mass and modified mass.

  20. 76 FR 27016 - Evaluating Test Procedures for Voting Systems

    Science.gov (United States)

    2011-05-10

    ... Understanding. Comparative information (e.g., testing results from unidentified machine A, B, and C) may be... and deployment of the equipment. NIST will pay all shipping costs except those not permitted by law...

  1. 40 CFR 86.127-00 - Test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ...); (iii) Simulated solar heat intensity of 850 W/m 2 (see § 86.161-00(d)); and (iv) air flow directed at... species for which emissions measurements are made. For exhaust testing, this requires sampling and...

  2. 40 CFR 86.127-12 - Test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... dry air (approximately 40 percent relative humidity); (iii) Simulated solar heat intensity of 850 W/m2... species for which emissions measurements are made. For exhaust testing, this requires sampling and...

  3. Improvement in Shrimp Hatchery Procedures for Toxicity Tests

    International Nuclear Information System (INIS)

    Nor Azizah Marsiddi; Fazliana Mohd Saaya; Anee Suryani Sued

    2015-01-01

    Toxicity testing of brine shrimp Artemia salina Brine shrimp lethality assay is a screening test to determine half the dose mortality (LC50) for its shrimp given certain herbal extract at a concentration tested. The shrimp child mortality half a dose indicator to determine level of toxicity before further testing done on animal cell culture and animal experiments also on the mouse. The use of new hardware, namely Artemio 1 has increased its shrimp production at a rate that more and faster than the use of the black box hatching previously taken from the method by Solis, 1993. brine shrimp eggs from Artemio mix also easier to use because it contains egg and sea salt have been ready mixed for use in experiments. In conclusion, this method improvements help increase the number of offspring produced shrimp and produce experimental method easier than previous methods. (author)

  4. A bayesian procedure in the context of sequential mastery testing

    Directory of Open Access Journals (Sweden)

    Hans J. Vos

    2000-01-01

    Full Text Available Un procedimiento bayesiano en el contexto de los tests secuenciales de clasificación. El propósito de este artículo consiste en obtener reglas óptimas en los tests secuenciales de clasificación. En un test secuencial de clasificación, la decisión a tomar es clasificar a una persona como maestro, no maestro, o continuar el test y administrar el siguiente ítem. Se aplica la teoría de la decisión secuencial bayesiana; es decir, las reglas óptimas resultan de minimizar las pérdidas esperados posteriores asociadas con todas las posibles reglas de decisión en cada momento de test. La principal ventaja de este acercamiento es que los costes de aplicar el test pueden ser tenidos en cuenta de manera explícita. Se asume el modelo binomial para determinar la probabilidad de respuesta correcta dado un cierto nivel de funcionamiento de la persona. Se adopta una pérdida umbral como función de perdida. El artículo termina con un estudio de simulación en el que la estrategia secuencial bayesiana se compara con otros procedimientos disponibles en la literatura para problemas de decisión similares.

  5. Modernisation of a test rig for determination of vehicle shock absorber characteristics by considering vehicle suspension elements and unsprung masses

    Science.gov (United States)

    Maniowski, M.; Para, S.; Knapczyk, M.

    2016-09-01

    This paper presents a modernization approach of a standard test bench for determination of damping characteristics of automotive shock absorbers. It is known that the real-life work conditions of wheel-suspension dampers are not easy to reproduce in laboratory conditions, for example considering a high frequency damper response or a noise emission. The proposed test bench consists of many elements from a real vehicle suspension. Namely, an original tyre-wheel with additional unsprung mass, a suspension spring, an elastic top mount, damper bushings and a simplified wheel guiding mechanism. Each component was tested separately in order to identify its mechanical characteristics. The measured data serve as input parameters for a numerical simulation of the test bench behaviour by using a vibratory model with 3 degrees of freedom. Study on the simulation results and the measurements are needed for further development of the proposed test bench.

  6. Single specimen fracture toughness determination procedure using instrumented impact test

    International Nuclear Information System (INIS)

    Rintamaa, R.

    1993-04-01

    In the study a new single specimen test method and testing facility for evaluating dynamic fracture toughness has been developed. The method is based on the application of a new pendulum type instrumented impact tester equipped with and optical crack mouth opening displacement (COD) extensometer. The fracture toughness measurement technique uses the Double Displacement Ratio (DDR) method, which is based on the assumption that the specimen is deformed as two rigid arms that rotate around an apparent centre of rotation. This apparent moves as the crack grows, and the ratio of COD versus specimen displacement changes. As a consequence the onset ductile crack initiation can be detected on the load-displacement curve. Thus, an energy-based fracture toughness can be calculated. In addition the testing apparatus can use specimens with the Double ligament size as compared with the standard Charpy specimen which makes the impact testing more appropriate from the fracture mechanics point of view. The novel features of the testing facility and the feasibility of the new DDR method has been verified by performing an extensive experimental and analytical study. (99 refs., 91 figs., 27 tabs.)

  7. A simplified test procedure for determining the effectiveness of adsorbents for the removal of methyl iodide

    International Nuclear Information System (INIS)

    Underhill, D.W.

    1993-01-01

    ASTM Test Procedure D3803 measures the ability of nuclear-grade carbon to remove methyl iodide from a stream of humidified air. This test, unlike all the other procedures developed by ASTM Committee D28, has evolved to become extremely complex. The intricacy of this test as well as the great difficulty in obtaining inter-laboratory agreement, creates doubt as tot the actual meaning of the results. Here a far simpler test system is described in which thermodynamic principles are used to maintain a constant, reproducible test procedure. This paper describes a system implementing these elements, its cost to build, and the factors affecting its accuracy. 11 refs., 1 fig

  8. Operability test procedure for 244-U DCRT. Revision 1

    International Nuclear Information System (INIS)

    Erhart, M.F.

    1995-01-01

    This OPT will insure the operability of various systems and their general equipment, used in the operation of the 244-U DCRT. Systems that will be tested include the following: Leak Detection Systems; Heat Trace System; Vessel Temperature Measurement System; Dip Tube Water System; Weight Factor and Specific Gravity System; Instrument Air System; Vessel Liquid Level System; Vessel Liquid Transfer System; and Exhauster Differential Pressure Indicating Controller System. The tests will cover checks on equipment operation and electrical interlocks, but will not cover checks on associated annunciator alarms which are covered in a separate OTP

  9. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop

  10. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''P''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  11. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop

  12. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  13. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  15. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''Q''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  16. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''T''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  17. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  18. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  19. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''U''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  20. 40 CFR 63.750 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... method in production on actual production parts or assemblies for a period of time sufficient to coat an... a laboratory or pilot production area, using parts and coatings representative of the process(es) where the alternative method is to be used. The laboratory test will use the same part configuration(s...

  1. 16 CFR 1632.5 - Mattress pad test procedure.

    Science.gov (United States)

    2010-01-01

    ... 1632.5 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION FLAMMABLE FABRICS ACT REGULATIONS... substrate. (b) Flame resistant mattress pads. The following additional requirements shall be applicable to mattress pads which contain a chemical fire retardant. (1) These mattress pads shall be tested in...

  2. 40 CFR 90.408 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ....408 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... during service accumulation is allowed only in accordance with § 90.118. (b) Engine pre-test preparation... by § 90.324(a). If necessary, allow the heated sample line, filters, and pumps to reach operating...

  3. 40 CFR 91.408 - Pre-test procedures.

    Science.gov (United States)

    2010-07-01

    ....408 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... accordance with § 91.117. (b) Engine pre-test preparation. (1) Drain and charge the fuel tank(s) with the..., including the sample probe, using mode 1 from Table 2 in appendix A of this subpart. The emission sampling...

  4. 47 CFR 11.61 - Tests of EAS procedures.

    Science.gov (United States)

    2010-10-01

    ... class D non-commercial educational FM and analog and digital LPTV stations are required to transmit only... and times on all channels. (ii) DBS providers, analog and digital class D non-commercial educational... stations must conduct these tests on all audio streams. Effective December 31, 2006, DTV stations must...

  5. A Test Procedure for Determining Models of LV Equipment

    NARCIS (Netherlands)

    Cuk, Vladimir; Cobben, Joseph F.G.; Kling, Wil L.; Timens, R.B.; Leferink, Frank Bernardus Johannes

    2009-01-01

    An automated test technique for determining parameters of low voltage equipment is presented in the paper. The aim of this research is to obtain simple models of household, office and industrial equipment which could be used to predict power quality problems during the design of low voltage

  6. 40 CFR 600.111-80 - Test procedures.

    Science.gov (United States)

    2010-07-01

    ... the end of the second cycle. (g) Engine starting and restarting. (1) If the engine is not running at... vehicle contain a record of the action. (h) Dynamometer test run. The following steps must be taken for... under-vehicle cooling and for controlling high tire or brake temperatures during dynamometer operation...

  7. Start-Stop Test Procedures on the PEMFC Stack Level

    DEFF Research Database (Denmark)

    Mitzel, Jens; Nygaard, Frederik; Veltzé, Sune

    The test is addressed to investigate the influence on stack durability of a long stop followed by a restart of a stack. Long stop should be defined as a stop in which the anodic compartment is fully filled by air due to stack leakages. In systems, leakage level of the stack is low and time to fil...

  8. 40 CFR 63.1257 - Test methods and compliance procedures.

    Science.gov (United States)

    2010-07-01

    ... chemical engineering principles, measurable process parameters, or physical or chemical laws or properties... flow rate and concentration; temperature; and the reaction kinetics of the constituents with the... Method 8260 or 8270 in “Test Methods for Evaluating Solid Waste, Physical/Chemical Methods,” EPA...

  9. 40 CFR 136.3 - Identification of test procedures.

    Science.gov (United States)

    2010-07-01

    ... availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register... density of the water sample. 8 When the MF method has been used previously to test waters with high... Wastewater, 15th Edition. 31 For samples known or suspected to contain high levels of silver (e.g., in excess...

  10. 40 CFR 86.334-79 - Test procedure overview.

    Science.gov (United States)

    2010-07-01

    ... cycle and 1 hot cycle. The Diesel engine test consists of 3 idle modes and 5 power modes at each of 2... to be conducted on an engine dynamometer. The exhaust gases generated during engine operation are... determination of the concentration of each pollutant, the fuel flow and the power output during each mode. The...

  11. 40 CFR 89.404 - Test procedure overview.

    Science.gov (United States)

    2010-07-01

    ... engine operating conditions to be conducted on an engine dynamometer. The exhaust gases, generated raw or... matter. For more information on particulate matter sampling see § 89.112(c). The test cycles consist of... (raw analysis), and the power output during each mode. The measured values are weighted and used to...

  12. 21 CFR 352.72 - General testing procedures.

    Science.gov (United States)

    2010-04-01

    ... required. (g) Number of subjects. A test panel shall consist of not more than 25 subjects with the number fixed in advance by the investigator. From this panel, at least 20 subjects must produce valid data for... administered the doses of UV radiation. After UV radiation exposure from the solar simulator is completed, all...

  13. 49 CFR 572.142 - Head assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ... acceleration versus time history curve shall be unimodal, and the oscillations occurring after the main pulse... for testing. (3) Suspend the head assembly with its midsagittal plane in vertical orientation as shown... head in transverse alignment with the CG, shall be used to ensure that the head transverse plane is...

  14. 40 CFR 85.1414 - Alternative test procedures.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Urban Bus Rebuild Requirements § 85.1414 Alternative... shall be representative of in-use urban bus operation. The requestor shall supply relevant technical... test is representative of in-use urban bus operation, the Agency shall determine whether to set such...

  15. 40 CFR 60.46 - Test methods and procedures.

    Science.gov (United States)

    2010-07-01

    ... material balance over the steam generating system shall be used to confirm the rate. (d) The owner or...-Fired Steam Generators for Which Construction Is Commenced After August 17, 1971 § 60.46 Test methods... D2015, or D5865 (solid fuels), D240 (liquid fuels), or D1826 (gaseous fuels) (all of these methods are...

  16. MAC mini acceptance test procedures, software Version 3.3

    International Nuclear Information System (INIS)

    Russell, V.K.

    1994-01-01

    The K Basins Materials Accounting (MAC) programs had some improvements made to it to to change slightly the access authorized users had to the modification of critical data. This ATP describes how the code was to be tested to verify its correctness

  17. 76 FR 47178 - Energy Efficiency Program: Test Procedure for Lighting Systems (Luminaires)

    Science.gov (United States)

    2011-08-04

    ... DEPARTMENT OF ENERGY [Docket Number EERE-2011-BT-TP-0041] RIN 1904-AC50 Energy Efficiency Program: Test Procedure for Lighting Systems (Luminaires) AGENCY: Office of Energy Efficiency and Renewable... (``DOE'' or the ``Department'') is currently evaluating energy efficiency test procedures for luminaires...

  18. 10 CFR 431.16 - Test procedures for the measurement of energy efficiency.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for the measurement of energy efficiency. 431.16 Section 431.16 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR... Methods of Determining Efficiency § 431.16 Test procedures for the measurement of energy efficiency. For...

  19. 75 FR 42579 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens; Repeal of...

    Science.gov (United States)

    2010-07-22

    ... provided in paragraph (i)(2) of this section, for each basic model of conventional cooking tops, and... the cooking efficiency test procedure for microwave ovens under the Energy Policy and Conservation Act (EPCA). DOE has determined that the microwave oven test procedure to measure the cooking efficiency does...

  20. 16 CFR 1611.33 - Test procedures for textile fabrics and film.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for textile fabrics and film... REGULATIONS STANDARD FOR THE FLAMMABILITY OF VINYL PLASTIC FILM Rules and Regulations § 1611.33 Test procedures for textile fabrics and film. (a)(1) All textile fabrics (except those with a nitro-cellulose...

  1. 76 FR 12825 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens

    Science.gov (United States)

    2011-03-09

    ... Conservation Program for Consumer Products: Test Procedure for Microwave Ovens AGENCY: Office of Energy.... Department of Energy (DOE) is amending its test procedures for microwave ovens under the Energy Policy and Conservation Act (EPCA) to provide for the measurement of standby mode and off mode power use by microwave...

  2. 75 FR 42612 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens

    Science.gov (United States)

    2010-07-22

    ... Conservation Program for Consumer Products: Test Procedure for Microwave Ovens AGENCY: Office of Energy... (NOPR) in which DOE proposed test procedures for microwave ovens under the Energy Policy and Conservation Act (EPCA) to measure standby mode and off mode power use by microwave ovens. To address issues...

  3. 78 FR 4015 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2013-01-18

    ... Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable... microwave ovens. That SNOPR proposed amendments to the DOE test procedure to incorporate provisions from the... energy use of products that combine a microwave oven with other appliance functionality, as well as minor...

  4. 75 FR 42611 - Energy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens

    Science.gov (United States)

    2010-07-22

    ... for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy... current active mode provisions in its test procedure for microwave ovens do not produce accurate and... concerns with the DOE microwave oven cooking efficiency test procedure. Elsewhere in today's Federal...

  5. A FLOW-THROUGH TESTING PROCEDURE WITH DUCKWEED (LEMNA MINOR L.)

    Science.gov (United States)

    Lemna minor is one of the smallest flowering plants. Because of its floating habit, ease of culture, and small size it is well adapted for laboratory investigations. Procedures for flow-through tests were developed. Testing procedures were developed with this apparatus. By using ...

  6. 77 FR 28673 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnace Fans

    Science.gov (United States)

    2012-05-15

    ... multipliers based on climate, consumer behavior assumptions, and product characteristics (e.g., multi-stage or... Conservation Program for Consumer Products: Test Procedures for Residential Furnace Fans; Proposed Rule #0;#0... Conservation Program for Consumer Products: Test Procedures for Residential Furnace Fans AGENCY: Office of...

  7. 40 CFR 86.1327-96 - Engine dynamometer test procedures; overview.

    Science.gov (United States)

    2010-07-01

    ... device, the exhaust pipe must be the same diameter as found in-use for at least 4 pipe diameters upstream... Exhaust Test Procedures § 86.1327-96 Engine dynamometer test procedures; overview. (a) The engine.... The exhaust emissions are diluted with ambient air and a continuous proportional sample is collected...

  8. 40 CFR Appendix A to Subpart T of... - Test of Solvent Cleaning Procedures

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 9 2010-07-01 2010-07-01 false Test of Solvent Cleaning Procedures A... CATEGORIES National Emission Standards for Halogenated Solvent Cleaning Pt. 63, Subpt. T, App. A Appendix A to Subpart T of Part 63—Test of Solvent Cleaning Procedures General Questions ___ 1. What is the...

  9. 75 FR 38422 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-07-02

    ... 2105-AD84 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of..., 2011. DATES: This rule is effective July 2, 2010. FOR FURTHER INFORMATION CONTACT: For program issues... Federal Regulations, as follows: PART 40--PROCEDURES FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING...

  10. CENRTC Project number-sign 2F3EOA, OCB A-376, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3E0A, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00041/M. This procedure separates three tests into separate sections: energization of A-376 duplex panel and circuits; SCADA tests; and A-376 local trip tests

  11. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    Energy Technology Data Exchange (ETDEWEB)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    The U.S. Department of Energy tasked NREL to develop a process for testing the reliability of models that predict retrofit energy savings, including their associated calibration methods. DOE asked NREL to conduct the work in phases so that a test procedure would be ready should DOE need it to meet legislative requirements related to residential retrofits in FY 2010. This report documents the initial 'Phase 1' test procedure.

  12. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  13. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  14. Comparison of likelihood testing procedures for parallel systems with covariances

    International Nuclear Information System (INIS)

    Ayman Baklizi; Isa Daud; Noor Akma Ibrahim

    1998-01-01

    In this paper we considered investigating and comparing the behavior of the likelihood ratio, the Rao's and the Wald's statistics for testing hypotheses on the parameters of the simple linear regression model based on parallel systems with covariances. These statistics are asymptotically equivalent (Barndorff-Nielsen and Cox, 1994). However, their relative performances in finite samples are generally known. A Monte Carlo experiment is conducted to stimulate the sizes and the powers of these statistics for complete samples and in the presence of time censoring. Comparisons of the statistics are made according to the attainment of assumed size of the test and their powers at various points in the parameter space. The results show that the likelihood ratio statistics appears to have the best performance in terms of the attainment of the assumed size of the test. Power comparisons show that the Rao statistic has some advantage over the Wald statistic in almost all of the space of alternatives while likelihood ratio statistic occupies either the first or the last position in term of power. Overall, the likelihood ratio statistic appears to be more appropriate to the model under study, especially for small sample sizes

  15. MBA acceptance test procedures, software Version 1.4

    International Nuclear Information System (INIS)

    Mullaney, J.E.; Russell, V.K.

    1994-01-01

    The Mass Balance Program (MBA) is an adjunct to the Materials Accounting database system, Version 3.4. MBA was written to equip the personnel performing K-Basin encapsulation tasks with a conservative estimate of accumulated sludge during the processing of canisters into and out of the chute. The K Basins Materials Balance programs had some minor improvements made to it to feedback the chute processing status to the operator better. This ATP describes how the code was to be tested to verify its correctness

  16. Apparatus and Experimental Procedures to Test Crystal Collimation

    CERN Document Server

    Montesano, S

    2012-01-01

    UA9 is an experimental setup operated in the CERN-SPS in view of investigating the feasibility of halo collimation assisted by bent crystals. The test collimation system is composed of one crystal acting as primary halo deflector in the horizontal plane and an absorber. Different crystals are tested in turn using two-arm goniometers with an angular reproducibility of better than 10 microrad. The performance of the system is assessed through the study of the secondary and tertiary halo in critical areas, by using standard machine instrumentation and few customized equipments. The alignment of the crystal is verified by measuring the loss rate close to the crystal position. The collimation efficiency is computed by intercepting the deflected halo with a massive collimator or with an imaging device installed into a Roman Pot. The leakage of the system is evaluated in the dispersion suppressor by means of movable aperture restrictions. In this contribution the setup and the experimental methods in use are revisit...

  17. Test of a mosquito eggshell isolation method and subsampling procedure.

    Science.gov (United States)

    Turner, P A; Streever, W J

    1997-03-01

    Production of Aedes vigilax, the common salt-marsh mosquito, can be assessed by determining eggshell densities found in soil. In this study, 14 field-collected eggshell samples were used to test a subsampling technique and compare eggshell counts obtained with a flotation method to those obtained by direct examination of sediment (DES). Relative precision of the subsampling technique was assessed by determining the minimum number of subsamples required to estimate the true mean and confidence interval of a sample at a predetermined confidence level. A regression line was fitted to cube-root transformed eggshell counts obtained from flotation and DES and found to be significant (P eggshells present. Eggshells obtained with the flotation method can be used to predict those from DES using the following equation: DES count = [1.386 x (flotation count)0.33 - 0.01]3.

  18. Project B610 process control configuration acceptance test procedure

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1994-01-01

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator's console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A

  19. Operability test procedure for TRUSAF assayer software upgrade

    International Nuclear Information System (INIS)

    Cejka, C.C.

    1995-01-01

    This OTP is to be used to ensure the operability of the Transuranic Waste Assay System (TRUWAS). The system was upgraded and requires a retest to assure satisfactory operation. The upgrade consists of an AST 486 computer to replace the IBM-PC/XT, and a software upgrade (CNEUT). The software calculations are performed in the same manner as in the previous system (NEUT), however, the new software is written in C Assembly Language. CNEUT is easier to use and far more powerful than the previous program. The TRUWAS is used to verify the TRU content of waste packages sent for storage in the Transuranic Storage and Assay Facility (TRUSAF). The TRUSAF is part of Westinghouse Hanford's certification program for waste to be shipped to the Waste Isolation Pilot Plant (WIPP) in New Mexico. The Transuranic Waste Assayer uses a combination passive-active neutron interrogation system to determine the TRU content of 55-gallon waste drums. The system consists of a shielded assay chamber; Deuterium-Tritium neutron generator; Helium-3 proportional counters; drum handling system; electronics including preamplifier, amplifier, and discriminator for each of the counter packages; and an AST 486 computer/printer system for data acquisition and analysis. The system can detect down to TRU levels of 10 nCi/g in the waste matrix. The equipment to be tested is: Assay Chamber Door Drum Turntable and Automatic Loading Platform Interlocks Assayer Software; and IBM computer/printer software. The objective of the test is to verify that the system is operational with the AST 486 computer, the software used in the new computer system correctly calculates TRU levels, and the new computer system is capable of storing and retrieving data

  20. Testing the structure of earthquake networks from multivariate time series of successive main shocks in Greece

    Science.gov (United States)

    Chorozoglou, D.; Kugiumtzis, D.; Papadimitriou, E.

    2018-06-01

    The seismic hazard assessment in the area of Greece is attempted by studying the earthquake network structure, such as small-world and random. In this network, a node represents a seismic zone in the study area and a connection between two nodes is given by the correlation of the seismic activity of two zones. To investigate the network structure, and particularly the small-world property, the earthquake correlation network is compared with randomized ones. Simulations on multivariate time series of different length and number of variables show that for the construction of randomized networks the method randomizing the time series performs better than methods randomizing directly the original network connections. Based on the appropriate randomization method, the network approach is applied to time series of earthquakes that occurred between main shocks in the territory of Greece spanning the period 1999-2015. The characterization of networks on sliding time windows revealed that small-world structure emerges in the last time interval, shortly before the main shock.

  1. Acceptance test procedure for the 105-KW isolation barrier leak rate

    International Nuclear Information System (INIS)

    McCracken, K.J.

    1995-01-01

    This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals. This Acceptance Test Procedure (ATP) has been prepared in accordance with CM-6-1 EP 4.2, Standard Engineering Practices

  2. Validation of IEEE P1547.1 Interconnection Test Procedures: ASCO 7000 Soft Load Transfer System

    Energy Technology Data Exchange (ETDEWEB)

    Kroposki, B.; Englebretson, S.; Pink, C.; Daley, J.; Siciliano, R.; Hinton, D.

    2003-09-01

    This report presents the preliminary results of testing the ASCO 7000 Soft Load Transfer System according to IEEE P1547.1 procedures. The ASCO system interconnects synchronous generators with the electric power system and provides monitoring and control for the generator and grid connection through extensive protective functions. The purpose of this testing is to evaluate and give feedback on the contents of IEEE Draft Standard P1547.1 Conformance Tests Procedures for Equipment Interconnecting Distributed Resources With Electric Power Systems.

  3. Test procedures for polyester immobilized salt-containing surrogate mixed wastes

    International Nuclear Information System (INIS)

    Biyani, R.K.; Hendrickson, D.W.

    1997-01-01

    These test procedures are written to meet the procedural needs of the Test Plan for immobilization of salt containing surrogate mixed waste using polymer resins, HNF-SD-RE-TP-026 and to ensure adequacy of conduct and collection of samples and data. This testing will demonstrate the use of four different polyester vinyl ester resins in the solidification of surrogate liquid and dry wastes, similar to some mixed wastes generated by DOE operations

  4. Test procedures and instructions for Hanford tank waste supernatant cesium removal

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, D.W., Westinghouse Hanford

    1996-05-31

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test using Hanford Double-Shell Slurry Feed supernatant liquor from tank 251-AW-101 in a bench-scale column.Cesium sorbents to be tested include resorcinol-formaldehyde resin and crystalline silicotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-022, Hanford Tank Waste Supernatant Cesium Removal Test Plan.

  5. Test procedures and instructions for Hanford complexant concentrate supernatant cesium removal using CST

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, D.W.

    1997-01-08

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test, using Hanford Complexant Concentrate supernatant liquor from tank 241-AN-107, in a bench-scale column. The cesium sorbent to be tested is crystalline silicotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-023, Hanford Complexant Concentrate Supernatant Cesium Removal Test Plan.

  6. Test Procedure for Axially Loaded Bucket Foundations in Sand (Large Yellow Box)

    DEFF Research Database (Denmark)

    Vaitkunaite, Evelina

    This is a practical guide for preparing the soil, running a CPT test, installing a scaled bucket foundation model and running a test in the large yellow sand box cos(Kristina) in the geotechnical laboratory at Aalborg University. The test procedure is used for the examination of statically...... and cyclically axially loaded bucket foundation model In dense sand. The foundation model in scale of approximately 1:10 compared to the prototype size. The guide describes the step-by-step procedure for tests with and without surface pressure. A detailed description of test setup using the large yellow sand box...... for a monopile testing was provided by Thomassen (2015a), procedure for monopile testing can be found in Thomassen (2015b), while safety instructions were given by Vaitkunaite et al. (2014)....

  7. Parametric Sensitivity Tests—European Polymer Electrolyte Membrane Fuel Cell Stack Test Procedures

    DEFF Research Database (Denmark)

    Araya, Samuel Simon; Andreasen, Søren Juhl; Kær, Søren Knudsen

    2014-01-01

    performed based on test procedures proposed by a European project, Stack-Test. The sensitivity of a Nafion-based low temperature PEMFC stack’s performance to parametric changes was the main objective of the tests. Four crucial parameters for fuel cell operation were chosen; relative humidity, temperature......As fuel cells are increasingly commercialized for various applications, harmonized and industry-relevant test procedures are necessary to benchmark tests and to ensure comparability of stack performance results from different parties. This paper reports the results of parametric sensitivity tests......, pressure, and stoichiometry at varying current density. Furthermore, procedures for polarization curve recording were also tested both in ascending and descending current directions....

  8. 77 FR 26607 - Energy Conservation Program: Test Procedures for Electric Motors and Small Electric Motors

    Science.gov (United States)

    2012-05-04

    ... Conservation Program: Test Procedures for Electric Motors and Small Electric Motors; Final Rules #0;#0;Federal... Procedures for Electric Motors and Small Electric Motors AGENCY: Office of Energy Efficiency and Renewable... electric motors and small electric motors. That supplemental proposal, along with an earlier proposal from...

  9. 46 CFR 159.007-3 - Production inspections and tests: Independent laboratory's procedures.

    Science.gov (United States)

    2010-10-01

    ...'s procedures. 159.007-3 Section 159.007-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND... meets the inspection and test procedures of the laboratory; and (3) Are accepted by the Commandant under...

  10. 10 CFR 431.444 - Test procedures for the measurement of energy efficiency.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Test procedures for the measurement of energy efficiency. 431.444 Section 431.444 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR... procedures for the measurement of energy efficiency. (a) Scope. Pursuant to section 346(b)(1) of EPCA, this...

  11. 16 CFR 1610.33 - Test procedures for textile fabrics and film.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test procedures for textile fabrics and film... for textile fabrics and film. (a)(1) All textile fabrics (except those with a nitro-cellulose fiber... under the procedures outlined in part 1611, Standard for the Flammability of Vinyl Plastic Film, and if...

  12. 40 CFR 63.8687 - What performance tests, design evaluations, and other procedures must I use?

    Science.gov (United States)

    2010-07-01

    ... evaluations, and other procedures must I use? 63.8687 Section 63.8687 Protection of Environment ENVIRONMENTAL... What performance tests, design evaluations, and other procedures must I use? (a) You must conduct each... run must last at least 1 hour. (e) You must use the following equations to determine compliance with...

  13. 40 CFR 63.7112 - What performance tests, design evaluations, and other procedures must I use?

    Science.gov (United States)

    2010-07-01

    ... evaluations, and other procedures must I use? 63.7112 Section 63.7112 Protection of Environment ENVIRONMENTAL..., design evaluations, and other procedures must I use? (a) You must conduct each performance test in Table... use wet dust suppression to control PM from PSH operations, a visible mist is sometimes generated by...

  14. CENRTC Project number-sign 2F3EOA, OCB A-386, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00043/M (CENRTC 2F3EOA MWTT OCB A-386 PACKAGE). This procedure separates four tests into separate sections: Energization of A-386 Duplex Panel and Circuits; Local RFL 6750 function tests and start-up; SCADA tests; and A-386 local trip tests

  15. Influences of Traction Load Shock on Artificial Partial Discharge Faults within Traction Transformer—Experimental Test for Pattern Recognition

    Directory of Open Access Journals (Sweden)

    Shuaibing Li

    2017-10-01

    Full Text Available Partial discharge (PD measurement and its pattern recognition are vital to fault diagnosis of transformers, especially to those traction substation transformers undergoing repetitive traction load shocks. This paper presents the primary factors induced by traction load shocks including high total harmonics distortion (THD, transient voltage impulse and high-temperature rise, and their effects on the feature parameters of PD. Experimental tests are conducted on six artificial PD models with these factors introduced one by one. Results reveal that the maximum PD quantity and the PD repetitive rate are favorable to be enlarged when the oil temperature exceeds 80 °C or the THD is higher than 16% with certain orders of harmonic. The decline in PD inception voltage can mainly be attributed to the transient voltage impulse. The variation in central frequency of the fast Fourier transformation (FFT spectra transformed from ultra-high frequency signals can mainly be attributed to high THD, especially when it exceeds 20%. The temperature rise has no significant influence on the FFT spectra; the transient voltage impulse, however, can result in a central frequency shift of the floating particle discharge. With the rapid development of high-speed railways, the study presented in this paper will be helpful for field PD detection and recognition of traction substation transformers in the future.

  16. Numerical prediction of shock induced oscillations over a 2D airfoil: Influence of turbulence modelling and test section walls

    Energy Technology Data Exchange (ETDEWEB)

    Thiery, Mylene [Aerodynamics and Energetics Modelling Department, Turbulence Modelling and Prediction Unit, ONERA Toulouse, 2 avenue Edouard Belin, 31055 Toulouse Cedex 4 (France); Coustols, Eric [Aerodynamics and Energetics Modelling Department, Turbulence Modelling and Prediction Unit, ONERA Toulouse, 2 avenue Edouard Belin, 31055 Toulouse Cedex 4 (France)]. E-mail: Eric.Coustols@onera.fr

    2006-08-15

    The present study deals with recent numerical results from on-going research conducted at ONERA/DMAE regarding the prediction of transonic flows, for which shock wave/boundary layer interaction is important. When this interaction is strong enough (M {>=} 1.3), shock induced oscillations (SIO) appear at the suction side of the airfoil and lead to the formation of unsteady separated areas. The main issue is then to perform unsteady computations applying appropriate turbulence modelling and relevant boundary conditions with respect to the test case. Computations were performed with the ONERA elsA software and the URANS-type approach, closure relationships being achieved from transport-equation models. Applications are provided for the OAT15A airfoil data base, well documented for unsteady CFD validation (mean and r.m.s. pressure, phase-averaged LDA data, ...). In this paper, the capabilities of turbulence models are evaluated with two 2D URANS strategies, under free-stream or confined conditions. The latter takes into account the adaptive upper and lower wind-tunnel walls. A complete 3D URANS simulation was then performed to demonstrate the real impact of all lateral wind-tunnel walls on such a flow.

  17. Numerical prediction of shock induced oscillations over a 2D airfoil: Influence of turbulence modelling and test section walls

    International Nuclear Information System (INIS)

    Thiery, Mylene; Coustols, Eric

    2006-01-01

    The present study deals with recent numerical results from on-going research conducted at ONERA/DMAE regarding the prediction of transonic flows, for which shock wave/boundary layer interaction is important. When this interaction is strong enough (M ≥ 1.3), shock induced oscillations (SIO) appear at the suction side of the airfoil and lead to the formation of unsteady separated areas. The main issue is then to perform unsteady computations applying appropriate turbulence modelling and relevant boundary conditions with respect to the test case. Computations were performed with the ONERA elsA software and the URANS-type approach, closure relationships being achieved from transport-equation models. Applications are provided for the OAT15A airfoil data base, well documented for unsteady CFD validation (mean and r.m.s. pressure, phase-averaged LDA data, ...). In this paper, the capabilities of turbulence models are evaluated with two 2D URANS strategies, under free-stream or confined conditions. The latter takes into account the adaptive upper and lower wind-tunnel walls. A complete 3D URANS simulation was then performed to demonstrate the real impact of all lateral wind-tunnel walls on such a flow

  18. Characterization Test Procedures for Intersection Collision Avoidance Systems Based on Vehicle-to-Vehicle Communications

    Science.gov (United States)

    2015-12-01

    Characterization test procedures have been developed to quantify the performance of intersection collision avoidance (ICA) systems based on vehicle-to-vehicle communications. These systems warn the driver of an imminent crossing-path collision at a r...

  19. 49 CFR Appendix E to Part 240 - Recommended Procedures for Conducting Skill Performance Tests

    Science.gov (United States)

    2010-10-01

    ... tailor their testing procedures to the specific operational realities. This appendix contains FRA's..., headlight? —Couple to cars at a safe speed? —Properly control in train slack and buff forces? —Properly use...

  20. Vaspar broth-disk procedure for antibiotic susceptibility testing of anaerobic bacteria.

    OpenAIRE

    West, S E; Wilkins, T D

    1980-01-01

    A modification of the Wilkins-Thiel broth-disk procedure for antibiotic susceptibility testing of anaerobic bacteria is described. This method utilizes an aerobically prepared medium overlaid with molten vaspar. Specialized anaerobic techniques or prereduced media are not required.

  1. 75 FR 26183 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-05-11

    ... 2105-AE01 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of...: For program issues, Bohdan Baczara, Office of Drug and Alcohol Policy and Compliance, 1200 New Jersey... of Federal Regulations, as follows: [[Page 26184

  2. 77 FR 31443 - Energy Conservation Program: Test Procedures for Residential Dishwashers, Dehumidifiers, and...

    Science.gov (United States)

    2012-05-25

    ... an ion exchange to remove calcium and magnesium ions from the water, by swapping sodium ions bonded... addresses energy and water use associated with dishwasher water softeners, the energy test cycle for... dehumidifier test procedure, eliminate measurement of gas pilot light energy use in the cooking products test...

  3. 19 CFR 101.9 - Test programs or procedures; alternate requirements.

    Science.gov (United States)

    2010-04-01

    ... basis for selecting participants. (b) NCAP testing. For purposes of conducting an approved test program or procedure designed to evaluate planned components of the National Customs Automation Program (NCAP... publication requirement. For tests affecting the NCAP, notice shall be published in the Federal Register not...

  4. A Comparison of Procedures for Content-Sensitive Item Selection in Computerized Adaptive Tests.

    Science.gov (United States)

    Kingsbury, G. Gage; Zara, Anthony R.

    1991-01-01

    This simulation investigated two procedures that reduce differences between paper-and-pencil testing and computerized adaptive testing (CAT) by making CAT content sensitive. Results indicate that the price in terms of additional test items of using constrained CAT for content balancing is much smaller than that of using testlets. (SLD)

  5. Development of Start-up and Shutdown Procedure for the HANARO Fuel Test Loop

    International Nuclear Information System (INIS)

    Park, S. K.; Sim, B. S.; Chi, D. Y.; Lee, J. M.; Lee, C. Y.; Ahn, S. H.

    2009-06-01

    A start-up and shutdown procedure for the HANARO fuel test loop has been developed. This is a facility for fuel and material irradiation tests. The facility provides experimental conditions similar to the normal operational pressures and temperatures of commercial PWR and CANDU plants. The normal operation modes of the HANARO fuel test loop are classified into loop shutdown, cold stand-by 1, cold stand-by 2, hot stand-by, and hot operation. The operation modes depend on the fission power of test fuels and the coolant temperature at the inlet of the in-pile test section. The HANARO must maintain a shutdown mode if the HANARO fuel test loop is loop shutdown, cold stand-by 1, cold stand-by 2, or hot stand-by. As the HANARO becomes power operation mode, the operation mode of the HANARO fuel test loop comes to hot operation from hot stand-by. The procedure for the HANARO fuel test loop consists of four main parts such as check of initial conditions, stat-up operation procedure, shutdown operation procedure, and check lists for operations. Several hot test operations ensure that the procedure is appropriate

  6. Thermocouple module halt failure acceptance test procedure for Tank 241-SY-101 DACS-1

    International Nuclear Information System (INIS)

    Ermi, A.M.

    1997-01-01

    The readiness of the Tank 241-SY-101 Data Acquisition and Control System (DACS-1) to provide monitoring and alarms for a halt failure of any thermocouple module will be tested during the performance of this procedure. Updated DACS-1 ''1/0 MODULE HEALTH STATUS'', ''MININ1'', and ''MININ2'' screens, which now provide indication of thermocouple module failure, will also be tested as part of this procedure

  7. Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.

    Energy Technology Data Exchange (ETDEWEB)

    Barnette, Daniel Wayne

    2005-10-01

    This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

  8. Preanalytical errors in primary healthcare: a questionnaire study of information search procedures, test request management and test tube labelling.

    Science.gov (United States)

    Söderberg, Johan; Brulin, Christine; Grankvist, Kjell; Wallin, Olof

    2009-01-01

    Most errors in laboratory medicine occur in the preanalytical phase and are the result of human mistakes. This study investigated information search procedures, test request management and test tube labelling in primary healthcare compared to the same procedures amongst clinical laboratory staff. A questionnaire was completed by 317 venous blood sampling staff in 70 primary healthcare centres and in two clinical laboratories (response rate = 94%). Correct procedures were not always followed. Only 60% of the primary healthcare staff reported that they always sought information in the updated, online laboratory manual. Only 12% reported that they always labelled the test tubes prior to drawing blood samples. No major differences between primary healthcare centres and clinical laboratories were found, except for test tube labelling, whereby the laboratory staff reported better practices. Re-education and access to documented routines were not clearly associated with better practices. The preanalytical procedure in the surveyed primary healthcare centres was associated with a risk of errors which could affect patient safety. To improve patient safety in laboratory testing, all healthcare providers should survey their preanalytical procedures and improve the total testing process with a systems perspective.

  9. Design of test and emergency procedures to improve operator behaviour in French nuclear power plants

    International Nuclear Information System (INIS)

    Griffon-Fouco, M.; Gomolinski, M.

    1982-09-01

    The incident analyses performed in French nuclear power plants high-lighted that deficiencies in the design of procedures are frequent causes of human errors. The process for developing new guidelines for the writing of test and emergency procedures is presented: this process is based on operators interviews and observations at the plants or at simulators. The main principles for the writing of procedures are developed. For example: - the elaboration of a procedure for action and of a separate educational procedure, - the coordination of crew responses, - the choice of vocabulary, graphs, flow charts and so on as regards the format. Other complementary actions, such as the training of operators in the use of procedures, are described

  10. Design of test and emergency procedures to improve operator behavior in French nuclear power plants

    International Nuclear Information System (INIS)

    Griffon-Fouco, M.; Gomolinski, M.

    1983-01-01

    The incident analyses performed in French nuclear power plants high-lighted that deficiencies in the design of procedures are frequent causes of human errors. The process for developing new guidelines for the writing of test and emergency procedures is presented: this process is based on operators interviews and observations at the plants or at simulators. The main principles for the writing of procedures are developed. For example: the elaboration of a procedure for action and of separate educational procedure; the coordination of crew responses; and the choice of vocabulary, graphs, flow charts and so on as regards the format. Other complementary actions, such as the training of operators in the use of procedures, are described

  11. Pressurized thermal shocks: the JRC Ispra experimental test rig and analytical results

    International Nuclear Information System (INIS)

    Jovanovic, A.; Lucia, A.C.

    1990-01-01

    The paper tackles some issues of particular interest for the remanent (remaining) life prediction for the pressurized components exposed to pressurized thermal shock (PTS) loads, that have been tackled in analytical work performed in the framework of the MPA - JRC collaboration for the PTS experimental research at the JRC Ispra. These issues regard in general application of damage mechanics, fracture mechanics and artificial intelligence (including the treatment of uncertainties in the PTS analysis and experiments). The considered issues are essential for further understanding and modelling of the crack behaviour and of the component response in PTS conditions. In particular, the development of the FRAP preprocessor and development and implementation of a methodology for analysis of local non-stationary heat transfer coefficients during a PTS, have been explained more in detail. FRAP is used as a frontend, for the finite element code ABAQUS, for the heat transfer, stress and fracture mechanics analyses. The ABAQUS results are used further on, for the probabilistic fatigue crack growth analysis performed by the COVASTOL code. (author)

  12. EFAM GTP 02 - the GKSS test procedure for determining the fracture behaviour of materials

    International Nuclear Information System (INIS)

    Schwalbe, K.H.; Heerens, J.; Zerbst, U.; Kocak, M.

    2002-01-01

    This document describes a unified fracture mechanics test method in procedural form for quasi-static testing of materials. It is based on the ESIS Procedures P1 and P2 and introduces additional features, such as middle cracked tension specimens, shallow cracks, the δ 5 crack tip opening displacement, the crack tip opening angle, the rate of dissipated energy, testing of weldments, and guidance for statistical treatment of scatter. Special validity criteria are given for tests on specimens with low constraint. This document represents an updated version of EFAM GTP 94. (orig.) [de

  13. An Iterative Procedure for Efficient Testing of B2B: A Case in Messaging Service Tests

    Energy Technology Data Exchange (ETDEWEB)

    Kulvatunyou, Boonserm [ORNL

    2007-03-01

    Testing is a necessary step in systems integration. Testing in the context of inter-enterprise, business-to-business (B2B) integration is more difficult and expensive than intra-enterprise integration. Traditionally, the difficulty is alleviated by conducting the testing in two stages: conformance testing and then interoperability testing. In conformance testing, systems are tested independently against a reference system. In interoperability testing, they are tested simultaneously against one another. In the traditional approach for testing, these two stages are performed sequentially with little feedback between them. In addition, test results and test traces are left only to human analysis or even discarded if the solution passes the test. This paper proposes an approach where test results and traces from both the conformance and interoperability tests are analyzed for potential interoperability issues; conformance test cases are then derived from the analysis. The result is that more interoperability issues can be resolved in the lower-cost conformance testing mode; consequently, time and cost required for achieving interoparble solutions are reduced.

  14. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU II card for Leak Detector Use Acceptance Test Procedure

    International Nuclear Information System (INIS)

    SMITH, S.G.

    1999-01-01

    The following Acceptance Test Procedure was written to test the ENRAF series 854 ATG with SPU II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and alarms functionality

  15. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU ll Card for Leak Detector Use Acceptance Test Procedure

    International Nuclear Information System (INIS)

    SMITH, S.G.

    1999-01-01

    The following Acceptance Test Procedure was written to test the Enraf Series 854 ATG with SPU-II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and the alarms functionality

  16. Initial land reclamation procedures related to possible Pu-cleanup activities at the Tonopah Test Range

    International Nuclear Information System (INIS)

    Wallace, A.; Romney, E.M.

    1976-02-01

    If areas of the Tonopah Test Range (TTR) are to be used for experimental tests of procedures for clean-up of 239 Pu contamination, there are experiences in the Great Basin Desert portions of the Nevada Test Site (NTS) which can serve as guides to reclamation and revegetation of such arid lands. Procedures which will encourage development of the grasses Hilaria jamesii and Oryzopsis hymenoides, as well as the perennial shrubs Eurotia lanata and Atriplex canescens would greatly improve the area as range land

  17. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid

  18. 75 FR 14287 - Energy Conservation Program: Test Procedures for Fluorescent Lamp Ballasts

    Science.gov (United States)

    2010-03-24

    ... uses the same measurement techniques as the existing test procedure. In any rulemaking to amend a test...; and (3) appearing on page 29 of the transcript. \\6\\ Ballast type refers to a grouping of ballasts that... grouping of lamps that have the same length, lumen package, base type, and diameter. In the ongoing...

  19. 77 FR 8178 - Test Procedures for Central Air Conditioners and Heat Pumps: Public Meeting

    Science.gov (United States)

    2012-02-14

    .... EERE-2010-BT-TP-0038] Test Procedures for Central Air Conditioners and Heat Pumps: Public Meeting... methodologies and gather comments on testing residential central air conditioners and heat pumps designed to use... residential central air conditioners and heat pumps that are single phase with rated cooling capacities less...

  20. Communication with patients during the prenatal testing procedure: an explorative qualitative study

    NARCIS (Netherlands)

    van Zwieten, Myra; Willems, Dick; Knegt, Lia; Leschot, Nico

    2006-01-01

    OBJECTIVE: While generally two phases of prenatal genetic counseling are distinguished, i.e. pre- and post-test counseling, we revealed a third form of communication during the testing procedure. The content of this intermediate communication was explored. METHODS: A secondary analysis was performed

  1. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid

  2. 75 FR 8526 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-25

    ... 2105-AD64 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of... required method. However, in response to comments requesting additional flexibility in testing methods, the... may increase flexibility and lower costs for employers who choose to use them over more expensive...

  3. 49 CFR 572.75 - Lumbar spine, abdomen, and pelvis assembly and test procedure.

    Science.gov (United States)

    2010-10-01

    ...) ANTHROPOMORPHIC TEST DEVICES 6-Year-Old Child § 572.75 Lumbar spine, abdomen, and pelvis assembly and test procedure. (a) Lumbar spine, abdomen, and pelvis assembly. The lumbar spine, abdomen, and pelvis consist of... 49 Transportation 7 2010-10-01 2010-10-01 false Lumbar spine, abdomen, and pelvis assembly and...

  4. Enraf series 854 Advanced Technology Gauge (ATG) acceptance test procedure. Revision 3

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1995-01-01

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area

  5. 75 FR 5722 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-04

    ... personal identifying information about an employee (other than a social security number (SSN) or other... testing required under this part. (c) As a drug testing laboratory located in Canada or Mexico which is... procedures. (d) As an IITF located in Canada or Mexico which is not certified by HHS under the NLCP, you are...

  6. 76 FR 69869 - Energy Conservation Program: Test Procedures for Residential Clothes Washers

    Science.gov (United States)

    2011-11-09

    ... ensure that the test procedure is representative of consumer behavior and repeatable among different test... would not be factored into its energy efficiency rating. This would imply that consumer behavior would... previous section, DOE does not have data to verify how consumers may adjust their behavior based on the...

  7. 76 FR 65616 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Central Air...

    Science.gov (United States)

    2011-10-24

    ... pages 2- 3. Both the American Heating and Refrigeration Institute (AHRI) and Trane stated that the... untested split system combinations for SEER and HSPF. \\4\\ ARMs are computer simulations used to rate... procedure, which is detailed in section 0, and comprises whole system testing, not testing or simulation of...

  8. Standard testing procedures for optical fiber and unshielded twisted pair at Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Adams, R.L.

    1993-11-01

    This document will establish a working standard for testing optical fiber and unshielded twisted pair cables included in the Lab-wide telecommunications cabling system. The purpose of these standard testing procedures is to deliver to all Sandians a reliable, low-maintenance, state-of-the-art, ubiquitous telecommunications cabling infrastructure capable of satisfying all current and future telecommunication needs.

  9. Test Operation Procedure (TOP) 01-1-010A Vehicle Test Course Severity (Surface Roughness)

    Science.gov (United States)

    2017-12-12

    Increases in roughness may signify the need to change course maintenance patterns. For example, secondary gravel roads at YTC go through a cycle of...CSTE-DTC-AT-AD) U.S. Army Aberdeen Test Center 400 Colleran Road Aberdeen Proving Ground, MD 21005-5059 8. PERFORMING ORGANIZATION REPORT...test courses at ATEC Test Centers. 15. SUBJECT TERMS Automotive test course Roughness of roads Wave number spectrum Test course surface roughness

  10. System Shock: The Archetype of Operational Shock

    Science.gov (United States)

    2017-05-25

    the battle space. They can also facilitate a much greater understanding of the variables involved in each party’s decision - making process. However...system shock nests within current US Army Unified Land Operations doctrine. In order to test the utility of system shock theory to Gray Zone...23 Neil E. Harrison, “Thinking about the World We Make ” in Chaos Theory in the Social Sciences: Foundations and Applications

  11. Test procedures and instructions for single shell tank saltcake cesium removal with crystalline silicotitanate

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, J.B.

    1997-01-07

    This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test, using Hanford Single Shell Tank Saltcake from tanks 24 t -BY- I 10, 24 1 -U- 108, 24 1 -U- 109, 24 1 -A- I 0 1, and 24 t - S-102, in a bench-scale column. The cesium sorbent to be tested is crystalline siticotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-024, Hanford Single Shell Tank Saltcake Cesium Removal Test Plan.

  12. Development of interim test methods and procedures for determining the performance of small photovoltaic systems

    Energy Technology Data Exchange (ETDEWEB)

    McNutt, P.; Kroposki, B.; Hansen, R.; Algra, K.; DeBlasio, R. [National Renewable Energy Lab., Golden, CO (United States)

    1998-09-01

    The National Renewable Energy Laboratory (NREL) is developing tests and procedures that will determine if the configuration of a small photovoltaic (PV) system is suitable for its intended use, and if the system will perform as specified. An overview of these procedures is presented in this paper. Development of standard test procedures will allow designers, manufacturers, system integrators, users, and independent laboratories to assess the performance of PV systems under outdoor prevailing conditions. An NREL Technical Report detailing the procedures is under way, and the IEEE Standards Coordinating Committee 21 (SCC21) has established a project on this subject. The work will be submitted to the IEEE SCC21 and International Electrotechnical Commission Technical Committee 82 (IEC TC82) for consideration as a consensus standard. Certification bodies such as PowerMark and PV Global Approval Program (PVGAP) may adopt the IEC and IEEE documents when testing systems. Developing standardized test methods and procedures at NREL to evaluate the outdoor performance of PV systems will encourage product quality and promote PV standards development. Standardized tests will assure people that PV systems will perform as specified for their intended applications. As confidence in PV systems increases, the successful commercialization of PV will grow internationally.

  13. Recommended procedures for performance testing of radiobioassay laboratories: Volume 2, In vitro samples

    International Nuclear Information System (INIS)

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed for the US Department of Energy and the US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The bioassay testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped develop testing procedures as part of an effort to evaluate the performance criteria by testing the existing measurement capabilities of various bioassay laboratories. This report recommends guidelines for the preparation, handling, storage, distribution, shipping, and documentation of in vitro test samples (artificial urine and fecal matter) for indirect bioassay. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 8 refs., 3 tabs

  14. Test Operations Procedure (TOP) 01-1-025 Camouflage Performance Testing Using Observers

    Science.gov (United States)

    2016-05-05

    one observer approaching the test article at a time, but these tests are time consuming and expensive to execute for collection of statistically...best data collection approach is live in the field using only one observer for each trial run but these tests are extremely time consuming and...with viewing angle, relative to the ground plane of the observation should be considered in the test design. The impact of aspect angle, such as

  15. Thermal shock tests with beryllium coupons in the electron beam facility JUDITH

    International Nuclear Information System (INIS)

    Roedig, M.; Duwe, R.; Schuster, J.L.A.

    1995-01-01

    Several grades of American and Russian beryllium have been tested in high heat flux tests by means of an electron beam facility. For safety reasons, major modifications of the facility had to be fulfilled in advance to the tests. The influence of energy densities has been investigated in the range between 1 and 7 MJ/m 2 . In addition the influence of an increasing number of shots at constant energy density has been studied. For all samples, surface profiles have been measured before and after the experiments. Additional information has been gained from scanning electron microscopy, and from metallography

  16. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid ''P''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix

  17. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix

  18. Laparoscopic Stephen-Fowler stage procedure: appropriate management for high intra-abdominal testes.

    Science.gov (United States)

    Agrawal, Amit; Joshi, Milind; Mishra, Pankaj; Gupta, Rahul; Sanghvi, Beejal; Parelkar, Sandesh

    2010-03-01

    The length of testicular vessels is the main length-limiting factor to bring down the testes in the scrotum. Fowler and Stephen proposed the division of testicular vessels, high and as far from the testes as possible to maintain collateral blood supply, to treat high intra-abdominal testes. Cortesi introduced the diagnostic laparoscopy and Jorden first did the laparoscopic orchiopexy for nonpalpable testes. We had done Fowler-Stephen staged orchiopexy for high intra-abdominal testes, in which both stages were done laparoscopically. In total, 17 testes of 13 patients had undergone laparoscopic staged Fowler-Stephen orchiopexy. The decision to perform a staged Fowler-Stephen orchiopexy was based on the distance of the testis from the deep inguinal ring on laparoscopy. If distance was more than 2.5 cm, then we proceeded to a laparoscopic staged Fowler-Stephen orchiopexy. In the first stage, testicular vessels were cauterized by bipolar diathermy. Laparoscopic second-stage Fowler-Stephen procedure was done 6 months after the first stage. Patients were regularly followed, and the success of the procedure was assessed by the size of the testes and the position in the scrotum. Testicular vascularity was assessed by color Doppler ultrasonography. There was no testicular atrophy on second stage and on follow-up. All testes were in the scrotum with good size on follow-up. There was no complication related to laparoscopy. In cases of high intra-abdominal testes, the staged Fowler-Stephen procedure should be the procedure of choice. This procedure yields a high success rate. Transaction of vessels by bipolar diathermy is a very safe, cost-effective method.

  19. A Bayesian decision procedure for testing multiple hypotheses in DNA microarray experiments.

    Science.gov (United States)

    Gómez-Villegas, Miguel A; Salazar, Isabel; Sanz, Luis

    2014-02-01

    DNA microarray experiments require the use of multiple hypothesis testing procedures because thousands of hypotheses are simultaneously tested. We deal with this problem from a Bayesian decision theory perspective. We propose a decision criterion based on an estimation of the number of false null hypotheses (FNH), taking as an error measure the proportion of the posterior expected number of false positives with respect to the estimated number of true null hypotheses. The methodology is applied to a Gaussian model when testing bilateral hypotheses. The procedure is illustrated with both simulated and real data examples and the results are compared to those obtained by the Bayes rule when an additive loss function is considered for each joint action and the generalized loss 0-1 function for each individual action. Our procedure significantly reduced the percentage of false negatives whereas the percentage of false positives remains at an acceptable level.

  20. INTERFERENCE OF UNIDIRECTIONAL SHOCK WAVES

    Directory of Open Access Journals (Sweden)

    P. V. Bulat

    2015-05-01

    Full Text Available Subject of study.We consider interference of unidirectional shock waves or, as they are called, catching up shock waves. The scope of work is to give a classification of the shock-wave structures that arise in this type of interaction of shock waves, and the area of their existence. Intersection of unidirectional shock waves results in arising of a shock-wave structure at the intersection point, which contains the main shock wave, tangential discontinuity and one more reflected gas-dynamic discontinuity of unknown beforehand type. The problem of determining the type of reflected discontinuity is the main problem that one has to solve in the study of catching shock waves interference. Main results.The paper presents the pictures of shock-wave structures arising at the interaction of catching up shock waves. The areas with a regular and irregular unidirectional interaction of shocks are described. Characteristic shock-wave structures are of greatest interest, where reflected gas-dynamic discontinuity degenerates into discontinuous characteristics. Such structures have a number of extreme properties. We have found the areas of existence for such shock-wave structures. There are also areas in which the steady-state solution is not available. The latter has determined revival of interest for the theoretical study of the problem, because the facts of sudden shock-wave structure destruction inside the air intake of supersonic aircrafts at high Mach numbers have been discovered. Practical significance.The theory of interference for unidirectional shock waves and design procedure are usable in the design of supersonic air intakes. It is also relevant for application possibility investigation of catching up oblique shock waves to create overcompressed detonation in perspective detonation air-jet and rocket engines.

  1. Hanford spent nuclear fuel cold vacuum drying proof of performance test procedure

    International Nuclear Information System (INIS)

    McCracken, K.J.

    1998-01-01

    This document provides the test procedure for cold testing of the first article skids for the Cold Vacuum Drying (CVD) process at the Facility. The primary objective of this testing is to confirm design choices and provide data for the initial start-up parameters for the process. The current scope of testing in this document includes design verification, drying cycle determination equipment performance testing of the CVD process and MCC components, heat up and cool-down cycle determination, and thermal model validation

  2. Acceptance test procedure for a portable, self-contained nitrogen supply

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0249 Rev. 1 and ECN 606112. The equipment being tested is a Portable, Self-Contained Nitrogen Supply. The unit was purchased as a Design and Fabrication procurement activity. The Functional Test was written by the Seller and is contained in Appendix A. The Functional test will be performed by the Seller with representatives of the Westinghouse Hanford Company performing inspection and witnessing the functional test at the Seller's location

  3. Design and Testing of CO2 Compression Using Supersonic Shock Wave Technology

    Energy Technology Data Exchange (ETDEWEB)

    Koopman, Aaron [Seattle Technology Center, Bellevue, WA (United States)

    2015-06-01

    This report summarizes work performed by Ramgen and subcontractors in pursuit of the design and construction of a 10 MW supersonic CO2 compressor and supporting facility. The compressor will demonstrate application of Ramgen’s supersonic compression technology at an industrial scale using CO2 in a closed-loop. The report includes details of early feasibility studies, CFD validation and comparison to experimental data, static test experimental results, compressor and facility design and analyses, and development of aerodynamic tools. A summary of Ramgen's ISC Engine program activity is also included. This program will demonstrate the adaptation of Ramgen's supersonic compression and advanced vortex combustion technology to result in a highly efficient and cost effective alternative to traditional gas turbine engines. The build out of a 1.5 MW test facility to support the engine and associated subcomponent test program is summarized.

  4. Test Operations Procedure (TOP) 05-2-543 Enhanced Flight Termination Receiver (EFTR) Range Certification Testing

    Science.gov (United States)

    2011-07-25

    35 5.10 Signal Strength Telemetry Output ( SSTO ) (Test Number 10) ............ 38 5.11 Operational...All command outputs and monitor outputs shall respond properly. TOP 05-2-543 25 July 2011 38 5.10 Signal Strength Telemetry Output ( SSTO ...Test Number 10). a. Purpose. This test verifies that the signal strength telemetry output ( SSTO ) voltage is monotonic and directly related to the

  5. Test procedure for anion exchange testing with Argonne 10-L solutions

    International Nuclear Information System (INIS)

    Compton, J.A.

    1995-01-01

    Four anion exchange resins will be tested to confirm that they will sorb and release plutonium from/to the appropriate solutions in the presence of other cations. Certain cations need to be removed from the test solutions to minimize adverse behavior in other processing equipment. The ion exchange resins will be tested using old laboratory solutions from Argonne National Laboratory; results will be compared to results from other similar processes for application to all plutonium solutions stored in the Plutonium Finishing Plant

  6. Test procedures to detect a loss of material in a sequence of balance periods

    International Nuclear Information System (INIS)

    Avenhaus, R.; Beedgen, R.; Sellinschegg, D.

    1985-06-01

    A workshop on Near-Real-Time Accountancy (NRTA) was held in KfK which came to a preliminary end in December 1982. In the framework of this workshop a number of sequential statistical test procedures were proposed which can be used in the case of a NRTA based safeguards regime. In the report the most promising test procedures are investigated. The analysis is based on the chemical separation process of a large model reprocessing facility with a throughput or 1000 tonnes per year. (orig.) [de

  7. Clean fog rapid procedure test of artificially and naturally polluted HVDC porcelain barrel insulators

    International Nuclear Information System (INIS)

    Vlastos, A.E.

    1992-01-01

    The first question asked in this paper refers to the variation of the peak leakage current prior to the flashover and the variation of the time prior to flashover in the test of artificially polluted insulators when using the up-and-down method. To answer this question sums up the test procedure used in the up-and-down method. For each trial represented the insulator was again polluted artificially and then dried following the procedure described in the paper. Then the insulator was transported into the fog chamber and the voltage and fog was switched on simultaneously. In these experiments a low fog injection rate was used

  8. A test procedure for energetic and performance analysis of cold appliances for the food industry

    International Nuclear Information System (INIS)

    Armani, F; Boscolo, A

    2013-01-01

    In this article we present a novel approach for the characterization of cold appliances and in particular of refrigerators based on the standard vapour compression cycle with a reciprocating on/off compressor. The test procedure is based on a virtual instrument that perform both the stimulus and the data acquisition on the device under test. Acquired data is elaborated to fit a semi-empirical model based on the energetic balances between thermal and electrical sub systems and the heat exchanged with the environment. This approach results in a simple method to calculate useful parameters of the refrigerator, such as energetic performance, cooling effect and limit values of thermal loads. The test procedure requires only a few temperatures and the electric power consumption to be monitored, resulting in a low impact on the refrigerator. Preliminary tests showed a good estimation of parameters and prediction of energy consumption and heat extraction capacity of the refrigerator under test

  9. Post Flight Analysis Of SHEFEX I: Shock Tunnel Testing And Related CFD Analysis

    Science.gov (United States)

    Schramm, Jan Martinez; Barth, Tarik; Wagner, Alexander; Hannemann, Klaus

    2011-05-01

    The SHarp Edge Flight EXperiment (SHEFEX) program of the German Aerospace Center (DLR) is primarily focused on the investigation of the potential to utilise improved shapes for space vehicles by considering sharp edges and facetted surfaces. One goal is to set up a sky based test facility to gain knowledge of the physics of hypersonic flow, complemented by numerical analysis and ground based testing. Further, the series of SHEFEX flight experiments is an excellent test bed for new technological concepts and flight instrumentation, and it is a source of motivation for young scientist and engineers providing an excellent school for future space-program engineers and managers. After the successful first SHEFEX flight in October 2005, a second flight is scheduled for September 2011 and additional flights are planned for 2015 ff. With the SHEFEX-I flight and the subsequent numerical and experimental post flight analysis, DLR could for the first time close the loop between the three major disciplines of aerothermodynamic research namely CFD, ground based testing and flight.

  10. Efficient Noninferiority Testing Procedures for Simultaneously Assessing Sensitivity and Specificity of Two Diagnostic Tests

    Directory of Open Access Journals (Sweden)

    Guogen Shan

    2015-01-01

    Full Text Available Sensitivity and specificity are often used to assess the performance of a diagnostic test with binary outcomes. Wald-type test statistics have been proposed for testing sensitivity and specificity individually. In the presence of a gold standard, simultaneous comparison between two diagnostic tests for noninferiority of sensitivity and specificity based on an asymptotic approach has been studied by Chen et al. (2003. However, the asymptotic approach may suffer from unsatisfactory type I error control as observed from many studies, especially in small to medium sample settings. In this paper, we compare three unconditional approaches for simultaneously testing sensitivity and specificity. They are approaches based on estimation, maximization, and a combination of estimation and maximization. Although the estimation approach does not guarantee type I error, it has satisfactory performance with regard to type I error control. The other two unconditional approaches are exact. The approach based on estimation and maximization is generally more powerful than the approach based on maximization.

  11. 40 CFR 86.163-00 - Spot check correlation procedures for vehicles tested using a simulation of the environmental...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Spot check correlation procedures for... Complete Heavy-Duty Vehicles; Test Procedures § 86.163-00 Spot check correlation procedures for vehicles... running change approval, each model year for any manufacturer undergoing the spot checking procedures of...

  12. 9 CFR 147.30 - Laboratory procedure recommended for the polymerase chain reaction (PCR) test for Mycoplasma...

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Laboratory procedure recommended for... Examination Procedures § 147.30 Laboratory procedure recommended for the polymerase chain reaction (PCR) test... tracheal swabs in PBS or 1 mL of broth culture by a non-phenolic procedure. Centrifuge samples at 14,000 x...

  13. Procedure to select test organisms for environmental risk assessment of genetically modified crops in aquatic systems.

    Science.gov (United States)

    Hilbeck, Angelika; Bundschuh, Rebecca; Bundschuh, Mirco; Hofmann, Frieder; Oehen, Bernadette; Otto, Mathias; Schulz, Ralf; Trtikova, Miluse

    2017-11-01

    For a long time, the environmental risk assessment (ERA) of genetically modified (GM) crops focused mainly on terrestrial ecosystems. This changed when it was scientifically established that aquatic ecosystems are exposed to GM crop residues that may negatively affect aquatic species. To assist the risk assessment process, we present a tool to identify ecologically relevant species usable in tiered testing prior to authorization or for biological monitoring in the field. The tool is derived from a selection procedure for terrestrial ecosystems with substantial but necessary changes to adequately consider the differences in the type of ecosystems. By using available information from the Water Framework Directive (2000/60/EC), the procedure can draw upon existing biological data on aquatic systems. The proposed procedure for aquatic ecosystems was tested for the first time during an expert workshop in 2013, using the cultivation of Bacillus thuringiensis (Bt) maize as the GM crop and 1 stream type as the receiving environment in the model system. During this workshop, species executing important ecological functions in aquatic environments were identified in a stepwise procedure according to predefined ecological criteria. By doing so, we demonstrated that the procedure is practicable with regard to its goal: From the initial long list of 141 potentially exposed aquatic species, 7 species and 1 genus were identified as the most suitable candidates for nontarget testing programs. Integr Environ Assess Manag 2017;13:974-979. © 2017 SETAC. © 2017 SETAC.

  14. The Shock and Vibration Bulletin. Part 3. Skylab, Vibration Testing and Analysis

    Science.gov (United States)

    1973-06-01

    SPECTRA D, 0. Smallwood , Sandia Laboratories, Albuquerque, New Mexico and A. F. Witte, Kaman Sciences, Colorado Springs, Colorado A TRANSIENT VIBRATION TEST...TECHNIQUE USING LEAST FAVORABLE RESPONSES D. 0. Smallwood , Sandia Laboratories, Albuquerque, New Mexico PAPERS APPEARING IN PART 2 Structural...form of the time history pdf is REFERENCES determined to be independent of changes in flight condition and sensor location, the 1. Norman Johnson and

  15. Towards Modernizing the Characterization of Shock and Detonation Physics Performance via Novel Diagnostics and Tests

    Science.gov (United States)

    Salyer, Terry

    2017-06-01

    For the bulk of detonation performance experiments, a fairly basic set of diagnostic techniques has evolved as the standard for acquiring the necessary measurements. Gold standard techniques such as pin switches and streak cameras still produce the high-quality data required, yet much room remains for improvement with regard to ease of use, cost of fielding, breadth of data, and diagnostic versatility. Over the past several years, an alternate set of diagnostics has been under development to replace many of these traditional techniques. Pulse Correlation Reflectometry (PCR) is a capable substitute for pin switches with the advantage of obtaining orders of magnitude more data at a small fraction of the cost and fielding time. Spectrally Encoded Imaging (SEI) can replace most applications of streak camera with the advantage of imaging surfaces through a single optical fiber that are otherwise optically inaccessible. Such diagnostics advance the measurement state of the art, but even further improvements may come through revamping the standardized tests themselves such as the copper cylinder expansion test. At the core of this modernization, the aforementioned diagnostics play a significant role in revamping and improving the standard test suite for the present era. This research was performed under the auspices of the United States Department of Energy.

  16. Procedure for vibration test of the fuel rod supported by spacer grids

    International Nuclear Information System (INIS)

    Choi, Myoung Hwan; Kang, Heung Seok; Yoon, Kyung Ho; Kim, Hyung Kyu; Song, Kee Nam

    2002-07-01

    One of the methods that are used to compare and verify the supporting performance of the spacer grids developed is the vibration characteristic test. In this report there are two aims. One is of the understand of the experimental method and procedure performing the modal testing using I-DEAS TDAS module. The other is the investigation of the vibration behaviors of a dummy fuel rod supported by 8 optimized H type spacer grids. This report describes the method and procedure of modal testing to obtain the vibration characteristics such as amplitudes, natural frequencies and mode shapes of the fuel rod using a shaker, a non-contact gap sensor and an accelerometer. This report provides a test procedure in detail so that anyone can be easily understood and use the I-DEAS TDAS program. The I-DEAS TDAS program related to the modal testing has several tasks including the Modal analysis, Signal Processing et al.. This report includes model preparation to prepare the geometrical model, Signal Processing (Sine/Standard measurement) to acquire the signal, Modal analysis to obtain the frequencies and mode shapes, Correlation to analyze the relation between the test and FE analysis and Post Processing tasks. In addition, this report contains the actual test and analysis data of a dummy fuel rod in length 3847mm supported by 8 optimized H type spacer grids

  17. Acceptance test procedure for K basins dose reduction project clean and coat equipment

    International Nuclear Information System (INIS)

    Creed, R.F.

    1996-01-01

    This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment's ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020

  18. In situ impulse test: an experimental and analytical evaluation of data interpretation procedures

    International Nuclear Information System (INIS)

    1975-08-01

    Special experimental field testing and analytical studies were undertaken at Fort Lawton in Seattle, Washington, to study ''close-in'' wave propagation and evaluate data interpretation procedures for a new in situ impulse test. This test was developed to determine the shear wave velocity and dynamic modulus of soils underlying potential nuclear power plant sites. The test is different from conventional geophysical testing in that the velocity variation with strain is determined for each test. In general, strains between 10 -1 and 10 -3 percent are achieved. The experimental field work consisted of performing special tests in a large test sand fill to obtain detailed ''close-in'' data. Six recording transducers were placed at various points on the energy source, while approximately 37 different transducers were installed within the soil fill, all within 7 feet of the energy source. Velocity measurements were then taken simultaneously under controlled test conditions to study shear wave propagation phenomenology and help evaluate data interpretation procedures. Typical test data are presented along with detailed descriptions of the results

  19. 75 FR 13009 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-03-18

    ... DEPARTMENT OF TRANSPORTATION Office of the Secretary 49 CFR Part 40 [Docket DOT-OST-2008-0088] RIN OST 2105-AD84 Procedures for Transportation Workplace Drug and Alcohol Testing Programs Correction In rule document 2010-3731 beginning on page 8528 in the issue of Thursday, February 25, 2010, make the...

  20. 75 FR 22213 - Energy Conservation Program: Test Procedures for General Service Fluorescent Lamps, Incandescent...

    Science.gov (United States)

    2010-04-28

    ..., Department of Energy. ACTION: Final rule; technical amendments. SUMMARY: This document contains a technical... test procedure regulations for the above-specified lamps. However, due to a drafting error, part of the.... Since the publication of that rule, it has come to DOE's attention that, due to a technical oversight, a...

  1. Comparison of IRT Likelihood Ratio Test and Logistic Regression DIF Detection Procedures

    Science.gov (United States)

    Atar, Burcu; Kamata, Akihito

    2011-01-01

    The Type I error rates and the power of IRT likelihood ratio test and cumulative logit ordinal logistic regression procedures in detecting differential item functioning (DIF) for polytomously scored items were investigated in this Monte Carlo simulation study. For this purpose, 54 simulation conditions (combinations of 3 sample sizes, 2 sample…

  2. Comparing Treatment and Control Groups on Multiple Outcomes: Robust Procedures for Testing a Directional Alternative Hypothesis

    Science.gov (United States)

    Lix, Lisa M.; Deering, Kathleen N.; Fouladi, Rachel T.; Manivong, Phongsack

    2009-01-01

    This study considers the problem of testing the difference between treatment and control groups on m [greater than or equal to] 2 measures when it is assumed a priori that the treatment group will perform better than the control group on all measures. Two procedures are investigated that do not rest on the assumptions of covariance homogeneity or…

  3. 75 FR 37593 - Energy Conservation Program for Consumer Products: Test Procedures for Clothes Dryers and Room...

    Science.gov (United States)

    2010-06-29

    ... docket number EERE-2008-BT-TP-0010 and/or RIN 1904-AC02 in the subject line of the message. 3. Mail: Ms... DOE clothes washer test procedure), which is assumed to proportionally impact dryer load sizes. DOE... noted that IEC Standard 62087 specifies methods of measuring the power consumption of TV receivers...

  4. Testing taste sensitivity and aversion in very young children : development of a procedure

    NARCIS (Netherlands)

    Visser, J; Kroeze, J.H.A.; Kamps, WA; Bijleveld, CMA

    Taste perception in 45 3- to 6-year-old children was tested using procedures specifically designed for this age group. Detection thresholds for sucrose and urea were measured by a staircase method and aversion to urea was assessed hedonically, using drawings of facial expressions. All children

  5. 75 FR 52892 - Energy Conservation Program for Consumer Products: Test Procedures for Residential Water Heaters...

    Science.gov (United States)

    2010-08-30

    ... ``Energy Conservation Program for Consumer Products Other Than Automobiles,'' including residential water... final rule revising energy conservation standards for residential water heaters, direct heating.... EERE-2009-BT-TP-0013] RIN 1904-AB95 Energy Conservation Program for Consumer Products: Test Procedures...

  6. 75 FR 8524 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-25

    ... 2105-AD67 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office of... IFR to mitigate this conflict between the DOT rules and what we view as beneficial State laws by.... It merely eliminated a conflict that would have precluded parties from complying with certain State...

  7. 77 FR 13887 - Energy Conservation Program: Test Procedures for Residential Clothes Washers

    Science.gov (United States)

    2012-03-07

    ... dryer usage factor; and (5) replaces the current representative load size calculation in the drying... specifications for the dryer to be used for bone-drying the test cloth; (10) clarifies the procedures for.... 12 at p. 4-5) NEEA expressed concern that the definition of the active washing mode leaves out...

  8. 75 FR 2122 - Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of...

    Science.gov (United States)

    2010-01-14

    ... Energy Consumption of Refrigerator-Freezers With Automatic Ice Makers AGENCY: Office of the General...) to prescribe standardized test procedures to measure the energy consumption of certain consumer... Energy Consumption of Electric Refrigerators and Electric Refrigerator- Freezers (Appendix A1). DOE...

  9. 78 FR 15807 - Energy Conservation Program: Test Procedures for Television Sets

    Science.gov (United States)

    2013-03-12

    ... displaying dynamic visual content from wired or wireless sources including but not limited to: * * *''. DOE...) standard ``CEA-2037-A, Determination of Television Average Power Consumption'' into the SNOPR. In today's SNOPR, DOE proposes to update the input power requirements in the TVs test procedure NOPR by referencing...

  10. 40 CFR 63.1365 - Test methods and initial compliance procedures.

    Science.gov (United States)

    2010-07-01

    ... permit limit applicable to the process vent. (D) Design analysis based on accepted chemical engineering... concentration, temperature, and the reaction kinetics of the constituents with the scrubbing liquid. The design... procedures specified in Method 8260 or 8270 in “Test Methods for Evaluating Solid Waste, Physical/Chemical...

  11. 78 FR 2340 - Energy Conservation Program: Test Procedures for Residential Water Heaters and Commercial Water...

    Science.gov (United States)

    2013-01-11

    ... corresponded to the levels in the American Society of Heating, Refrigerating and Air Conditioning Engineers... provides a brief history of DOE's more recent test procedure rulemakings related to residential water... performance (e.g., such as ambient air temperature, ambient relative humidity, and inlet water temperature...

  12. 77 FR 60318 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: 6-acetylmorphine (6-AM...

    Science.gov (United States)

    2012-10-03

    ... 2105-AE14 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: 6-acetylmorphine... 12866 and Regulatory Flexibility Act This Final Rule is not significant for purposes of Executive Order... certify, under the Regulatory Flexibility Act, that this rule does not have a significant economic impact...

  13. 75 FR 8528 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Science.gov (United States)

    2010-02-25

    ... OST 2105-AD84 Procedures for Transportation Workplace Drug and Alcohol Testing Programs AGENCY: Office... of small entities, for purposes of the Regulatory Flexibility Act. The Department makes these... necessary for the Department to conduct a regulatory evaluation or Regulatory Flexibility Analysis for this...

  14. 78 FR 42719 - Test Procedures for Showerheads, Faucets, Water Closets, Urinals, and Commercial Prerinse Spray...

    Science.gov (United States)

    2013-07-17

    ... flow control insert of showerheads for purposes of amending DOE test procedures. In addition, DOE... may be publicly available, such as information that is exempt from public disclosure. A link to the docket Web page can be found at www.regulations.gov . The www.regulations.gov Web page contains a link to...

  15. 76 FR 65631 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Science.gov (United States)

    2011-10-24

    ... Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable... residential microwave ovens. DOE specifically is seeking information, data, and comments regarding representative and repeatable methods for measuring the energy use of microwave-only ovens and combination...

  16. Performance and Health Test Procedure for Grid Energy Storage Systems: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Baggu, Murali M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Smith, Kandler A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Friedl, Andrew [San Diego Gas and Electric; Bialek, Thomas [San Diego Gas and Electric; Schimpe, Michael Robert [Technical University of Munich

    2017-07-27

    A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: Round-trip efficiency, Standby losses, Response time/accuracy, and Useable Energy/ State of Charge at different discharge/charge rates over the system's lifetime. The procedures are divided into Reference Performance Tests, which require the system to be put in a test mode and are to be conducted in intervals, and Real-time Monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.

  17. CENRTC Project No. 2F3EOA, OCB A-372, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC No. 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00038/M (CENRTC 2F3EOA MWTT OCB A-372 PACKAGE)

  18. 78 FR 63410 - Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment...

    Science.gov (United States)

    2013-10-24

    ... test procedures for direct heating equipment and pool heaters established under the Energy Policy and... U.S.C. 6293(e)(2)) The current energy conservation standards for direct heating equipment and pool... DEPARTMENT OF ENERGY 10 CFR Part 430 [Docket Number EERE-2013-BT-TP-0004] RIN 1904-AC94 Energy...

  19. 76 FR 63211 - Energy Efficiency Program: Test Procedures for Residential Water Heaters, Direct Heating...

    Science.gov (United States)

    2011-10-12

    ... DEPARTMENT OF ENERGY 10 CFR Part 430 [Docket Number EERE-2011-BT-TP-0042] RIN 1904-AC53 Energy Efficiency Program: Test Procedures for Residential Water Heaters, Direct Heating Equipment, and Pool Heaters AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Request for...

  20. 40 CFR 205.54-1 - Low speed sound emission test procedures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Low speed sound emission test procedures. 205.54-1 Section 205.54-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Medium and Heavy Trucks § 205...

  1. 75 FR 57555 - Energy Conservation Program for Consumer Products: Test Procedure for Residential Clothes Washers

    Science.gov (United States)

    2010-09-21

    ... technologies not covered by the current procedure; (2) more accurately reflect current consumer behavior and... Part II Department of Energy 10 CFR Part 430 Energy Conservation Program for Consumer Products... [Docket No. EERE-2010-BT-TP-0021] RIN 1904-AC08 Energy Conservation Program for Consumer Products: Test...

  2. 75 FR 57556 - Energy Conservation Program for Consumer Products: Test Procedure for Residential Clothes Washers

    Science.gov (United States)

    2010-09-21

    ... technologies not covered by the current procedure; (2) more accurately reflect current consumer behavior and... Part II Department of Energy 10 CFR Part 430 Energy Conservation Program for Consumer Products... [Docket No. EERE-2010-BT-TP-0021] RIN 1904-AC08 Energy Conservation Program for Consumer Products: Test...

  3. 75 FR 34064 - Manufactured Home Construction and Safety Standards, Test Procedures for Roof Trusses

    Science.gov (United States)

    2010-06-16

    ... failure. Failure is rupture, fracture, or excessive yielding. (v) Final recovery phase. Remove 2.0 times... members of the public. Commenters should follow the instructions provided on that site to submit comments... nondestructive testing procedure for roof trusses that permits a lower overall factor of safety to be used in...

  4. 76 FR 25211 - Energy Conservation Program: Test Procedures for Fluorescent Lamp Ballasts

    Science.gov (United States)

    2011-05-04

    ...-government procurement policies that specify high efficiency ballasts. (CA IOUs, No. 19 at p. 2; NRDC, No. 21... luminous efficiency (BLE), which is measured directly using electrical measurements instead of the photometric measurements employed in the test procedure at Appendix Q. The calculation of BLE includes a...

  5. Development of a Laboratory Test Procedure to Evaluate Tack Coat Performance

    OpenAIRE

    YILDIRIM, Yetkin; SMIT, André de Fortier; KORKMAZ, Armagan

    2014-01-01

    A laboratory testing procedure is presented, the results of which may be used for determining the best combination of tack coat type, mixture type, and application rate to be applied in the field for optimum performance. Tack coat related performance results were determined from Hamburg wheel tracking and simple shear tests on laboratory prepared specimens. This study was undertaken to evaluate the shear strength performance of tack coats under laboratory-controlled conditions. The ...

  6. Test-Induced Priming Impairs Source Monitoring Accuracy in the DRM Procedure

    OpenAIRE

    Dewhurst, S.; Knott, L.; Howe, M. L.

    2011-01-01

    Three experiments investigated the effects of test-induced priming (TIP) on false recognition in the Deese/Roediger-McDermott procedure. In Experiment 1, TIP significantly increased false recognition for participants who made old/new decisions at test but not for participants who made remember/know judgements or were given diagnostic information to help them avoid false recognition. In Experiment 2, a TIP effect was observed with old/new recognition but not when participants were required to ...

  7. Bureau of radiological health compliance testing procedures for cabinet S-ray systems

    International Nuclear Information System (INIS)

    Miller, E.A.; Sprau, D.

    1976-01-01

    A manual has been developed by the Bureau of Radiological Health of the Food and Drug Administration to establish procedures for the routine field testing of cabinet x-ray systems to determine compliance with the Federal Performance Standard for Cabinet X-Ray Systems, 21 CFR 1020.40. The manual provides specific instructions for testing each model of cabinet x-ray system. Results from the inspection are recorded on a data from which is designed to permit automatic data processing

  8. 40 CFR 53.63 - Test procedure: Wind tunnel inlet aspiration test.

    Science.gov (United States)

    2010-07-01

    ... the sampler inlet opening centered in the sampling zone. To meet the maximum blockage limit of § 53.62(c)(1) or for convenience, part of the test sampler may be positioned external to the wind tunnel... = reference method sampler volumetric flow rate; and t = sampling time. (iii) Remove the reference method...

  9. Anafylactische shock na injectie van patentblauw voor schildwachtklieronderzoek

    NARCIS (Netherlands)

    van der Horst, J. C.; de Bock, M. J.; Klinkenbijl, J. H.

    2001-01-01

    After being diagnosed with a melanoma, an 18-year-old woman developed anaphylactic shock following an intracutaneous injection of patent blue during a sentinel lymph node biopsy procedure. Intracutaneous allergy tests revealed positive reactions with patent blue (Bleu patenté V 'Guerbet') as well as

  10. Dynamic Pressure of Liquid Mercury Target During 800-MeV Proton Thermal Shock Tests

    International Nuclear Information System (INIS)

    Allison, S.W.; Andriulli, J.B.; Cates, M.R.; Earl, D.D.; Haines, J.R.; Morrissey, F.X.; Tsai, C.C.; Wender, S.

    2000-01-01

    Described here are efforts to diagnose transient pressures generated by a short-pulse (about 0.5 microseconds) high intensity proton (∼ 2 * 10 14 per pulse) beam. Proton energy is 800-MeV. The tests were performed at the Los Alamos Neutron Science Center - Weapons Neutron Research (LANSCE-WNR). Such capability is required for understanding target interaction for the Spallation Neutron Source project as described previously at this conference.1-4 The main approach to effect the pressure measurements utilized the deflection of a diaphragm in intimate contact with the mercury. There are a wide variety of diaphragm-deflection methods used in scientific and industrial applications. Many deflection-sensing approaches are typically used, including, for instance, capacitive and optical fiber techniques. It was found, however, that conventional pressure measurement using commercial pressure gages with electrical leads was not possible due to the intense nuclear radiation environment. Earlier work with a fiber optic strain gauge demonstrated the viability of using fiber optics for this environment

  11. A new method for testing thermal shock resistance properties of soapstone – Effects of microstructures and mineralogical variables

    Directory of Open Access Journals (Sweden)

    A. Huhta

    2016-09-01

    Full Text Available Soapstone industry utilizes different types of soapstone mainly as a construction material for fireplaces. In this application soapstone has to meet different temperature requirements in different parts of fireplaces. Mineralogical and structural information is needed for placing an appropriate type of soapstone in an appropriate position in the fireplace construction. This allows employment of higher temperatures resulting in more particulate-free combustion, which makes it possible for soapstone industry to develop more efficient and environmentally friendly fireplaces. Of many soapstone types, which differ from each other in their chemical composition and thermal properties, carbonate soapstone and its microstructural variations were investigated in this study. A new method was developed to measure thermal shock resistant of natural stones. By exposing carbonate soapstone samples of different textural types to rapid temperature changes, it was possible to determine the parameters that affect the capacity of the rock to resist thermal shock. The results indicate that the type of microtexture is an important factor in controlling the thermal shock resistance of carbonate soapstone. The soapstone samples with a high thermal shock resistance show deformation textures, such as crenulation cleavage and S/C mylonite. A strong negative correlation was observed between the thermal shock resistance and length of cleavage domains in foliated rocks. Also a slight elevation in the iron concentration of talc and magnesite was discovered to improve the thermal shock resistance of carbonate soapstone. Attention should especially be paid to the length and planarity of cleavage domains of spaced foliation.

  12. [Procedure of seed quality testing and seed grading standard of Prunus humilis].

    Science.gov (United States)

    Wen, Hao; Ren, Guang-Xi; Gao, Ya; Luo, Jun; Liu, Chun-Sheng; Li, Wei-Dong

    2014-11-01

    So far there exists no corresponding quality test procedures and grading standards for the seed of Prunus humilis, which is one of the important source of base of semen pruni. Therefor we set up test procedures that are adapt to characteristics of the P. humilis seed through the study of the test of sampling, seed purity, thousand-grain weight, seed moisture, seed viability and germination percentage. 50 cases of seed specimens of P. humilis tested. The related data were analyzed by cluster analysis. Through this research, the seed quality test procedure was developed, and the seed quality grading standard was formulated. The seed quality of each grade should meet the following requirements: for first grade seeds, germination percentage ≥ 68%, thousand-grain weight 383 g, purity ≥ 93%, seed moisture ≤ 5%; for second grade seeds, germination percentage ≥ 26%, thousand-grain weight ≥ 266 g, purity ≥ 73%, seed moisture ≤9%; for third grade seeds, germination percentage ≥ 10%, purity ≥ 50%, thousand-grain weight ≥ 08 g, seed moisture ≤ 13%.

  13. Reconnaissance On Chi-Square Test Procedure For Determining Two Species Association

    Science.gov (United States)

    Marisa, Hanifa

    2008-01-01

    Determining the assosiation of two species by using chi-square test has been published. Utility of this procedure to plants species at certain location, shows that the procedure could not find "ecologically" association. Tens sampling units have been made to record some weeds species in Indralaya, South Sumatera. Chi square test; Xt2 = N[|(ad)-(bc)|-(N/2)]2/mnrs (Eq:1) on two species (Cleome sp and Eleusine indica) of the weeds shows positive assosiation; while ecologically in nature, there is no relationship between them. Some alternatives are proposed to this problem; simplified chi-square test steps, make further study to find out ecologically association, or at last, ignore it.

  14. Acceptance test procedure, 241-SY-101/241-C-106 shot loading system

    International Nuclear Information System (INIS)

    Ostrom, M.J.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations

  15. Memory and other properties of multiple test procedures generated by entangled graphs.

    Science.gov (United States)

    Maurer, Willi; Bretz, Frank

    2013-05-10

    Methods for addressing multiplicity in clinical trials have attracted much attention during the past 20 years. They include the investigation of new classes of multiple test procedures, such as fixed sequence, fallback and gatekeeping procedures. More recently, sequentially rejective graphical test procedures have been introduced to construct and visualize complex multiple test strategies. These methods propagate the local significance level of a rejected null hypothesis to not-yet rejected hypotheses. In the graph defining the test procedure, hypotheses together with their local significance levels are represented by weighted vertices and the propagation rule by weighted directed edges. An algorithm provides the rules for updating the local significance levels and the transition weights after rejecting an individual hypothesis. These graphical procedures have no memory in the sense that the origin of the propagated significance level is ignored in subsequent iterations. However, in some clinical trial applications, memory is desirable to reflect the underlying dependence structure of the study objectives. In such cases, it would allow the further propagation of significance levels to be dependent on their origin and thus reflect the grouped parent-descendant structures of the hypotheses. We will give examples of such situations and show how to induce memory and other properties by convex combination of several individual graphs. The resulting entangled graphs provide an intuitive way to represent the underlying relative importance relationships between the hypotheses, are as easy to perform as the original individual graphs, remain sequentially rejective and control the familywise error rate in the strong sense. Copyright © 2012 John Wiley & Sons, Ltd.

  16. A P-value model for theoretical power analysis and its applications in multiple testing procedures

    Directory of Open Access Journals (Sweden)

    Fengqing Zhang

    2016-10-01

    Full Text Available Abstract Background Power analysis is a critical aspect of the design of experiments to detect an effect of a given size. When multiple hypotheses are tested simultaneously, multiplicity adjustments to p-values should be taken into account in power analysis. There are a limited number of studies on power analysis in multiple testing procedures. For some methods, the theoretical analysis is difficult and extensive numerical simulations are often needed, while other methods oversimplify the information under the alternative hypothesis. To this end, this paper aims to develop a new statistical model for power analysis in multiple testing procedures. Methods We propose a step-function-based p-value model under the alternative hypothesis, which is simple enough to perform power analysis without simulations, but not too simple to lose the information from the alternative hypothesis. The first step is to transform distributions of different test statistics (e.g., t, chi-square or F to distributions of corresponding p-values. We then use a step function to approximate each of the p-value’s distributions by matching the mean and variance. Lastly, the step-function-based p-value model can be used for theoretical power analysis. Results The proposed model is applied to problems in multiple testing procedures. We first show how the most powerful critical constants can be chosen using the step-function-based p-value model. Our model is then applied to the field of multiple testing procedures to explain the assumption of monotonicity of the critical constants. Lastly, we apply our model to a behavioral weight loss and maintenance study to select the optimal critical constants. Conclusions The proposed model is easy to implement and preserves the information from the alternative hypothesis.

  17. Specifications and test procedures for airline-type supplied-air suits

    International Nuclear Information System (INIS)

    Revoir, W.H.; Pritchard, J.A.; Davis, T.O.; Richards, C.P.; Wheat, L.D.

    1975-05-01

    Procedures and requirements have been established to permit airline-type supplied-air suits needed by contractors of the Energy Research and Development Administration to be tested for performance by the Respirator Research and Development Section, Industrial Hygiene Group, of the Los Alamos Scientific Laboratory, and to have the adequacy of the performance of these devices evaluated by the Los Alamos Scientific Laboratory Respirator Advisory Committee. Test equipment, test methods, and performance criteria for airline-type supplied-air suits are prescribed. (U.S.)

  18. Testing Procedures and Results of the Prototype Fundamental Power Coupler for the Spallation Neutron Source

    International Nuclear Information System (INIS)

    M. Stirbet; I.E. Campisi; E.F. Daly; G.K. Davis; M. Drury; P. Kneisel; G. Myneni; T. Powers; W.J. Schneider; K.M. Wilson; Y. Kang; K.A. Cummings; T. Hardek

    2001-01-01

    High-power RF testing with peak power in excess of 500 kW has been performed on prototype Fundamental Power Couplers (FPC) for the Spallation Neutron Source superconducting (SNS) cavities. The testing followed the development of procedures for cleaning, assembling and preparing the FPC for installation in the test stand. The qualification of the couplers has occurred for the time being only in a limited set of conditions (travelling wave, 20 pps) as the available RF system and control instrumentation are under improvement

  19. Experimental Testing Procedures and Dynamic Model Validation for Vanadium Redox Flow Battery Storage System

    DEFF Research Database (Denmark)

    Baccino, Francesco; Marinelli, Mattia; Nørgård, Per Bromand

    2013-01-01

    The paper aims at characterizing the electrochemical and thermal parameters of a 15 kW/320 kWh vanadium redox flow battery (VRB) installed in the SYSLAB test facility of the DTU Risø Campus and experimentally validating the proposed dynamic model realized in Matlab-Simulink. The adopted testing...... efficiency of the battery system. The test procedure has general validity and could also be used for other storage technologies. The storage model proposed and described is suitable for electrical studies and can represent a general model in terms of validity. Finally, the model simulation outputs...

  20. Opioid/NMDA receptors blockade reverses the depressant-like behavior of foot shock stress in the mouse forced swimming test.

    Science.gov (United States)

    Haj-Mirzaian, Arya; Ostadhadi, Sattar; Kordjazy, Nastaran; Dehpour, Ahmad Reza; Ejtemaei Mehr, Shahram

    2014-07-15

    Opioid and glutamatergic receptors have a key role in depression following stress. In this study, we assessed opioid and glutamatergic receptors interaction with the depressant-like behavior of acute foot-shock stress in the mouse forced swimming test. Stress was induced by intermittent foot shock stimulation during 30min and swim periods were afterwards conducted by placing mice in separated glass cylinders filled with water for 6min. The immobility time during the last 4min of the test was considered. Acute foot-shock stress significantly increased the immobility time of mice compared to non-stressed control group (P≤0.01). Administration of non-selective opioid receptors antagonist, naltrexone (1 and 2mg/kg, i.p.), and the selective non-competitive NMDA receptor antagonist, MK-801 (0.05mg/kg, i.p.), and the selective serotonin reuptake inhibitor, fluoxetine (5mg/kg), significantly reduced the immobility time in stressed animals (P≤0.01). Lower doses of MK-801 (0.01mg/kg), naltrexone (0.3mg/kg), NMDA (75mg/kg) and morphine(5mg/kg) had no effect on foot-shock stressed mice. Combined treatment of sub-effective doses of naltrexone and MK-801 significantly showed an antidepressant-like effect (P≤0.001). On the other hand, co-administration of non-effective doses of NMDA and morphine with effective doses of naltrexone and MK-801 reversed the anti-immobility effect of these drugs. Taken together, we have for the first time demonstrated the possible role of opioid/NMDA receptors signaling in the depressant-like effect of foot-shock stress, and proposed the use of drugs that act like standard anti-depressants in stress-induced depression. Copyright © 2014. Published by Elsevier B.V.

  1. A test procedure for determining the influence of stress ratio on fatigue crack growth

    Science.gov (United States)

    Fitzgerald, J. H.; Wei, R. P.

    1974-01-01

    A test procedure is outlined by which the rate of fatigue crack growth over a range of stress ratios and stress intensities can be determined expeditiously using a small number of specimens. This procedure was developed to avoid or circumvent the effects of load interactions on fatigue crack growth, and was used to develop data on a mill annealed Ti-6Al-4V alloy plate. Experimental data suggest that the rates of fatigue crack growth among the various stress ratios may be correlated in terms of an effective stress intensity range at given values of K max. This procedure is not to be used, however, for determining the corrosion fatigue crack growth characteristics of alloys when nonsteady-state effects are significant.

  2. Shock and Vibration. Volume 1, Issue 1

    National Research Council Canada - National Science Library

    Pilkey, Walter D

    1994-01-01

    ..., and earthquake engineering. Among the specific areas to be covered are vibration testing and control, vibration condition monitoring and diagnostics, shock hardenings, modal technology, shock testing, data acquisition, fluid...

  3. Canadian Registry of ICD Implant Testing procedures (CREDIT): current practice, risks, and costs of intraoperative defibrillation testing.

    Science.gov (United States)

    Healey, Jeff S; Dorian, Paul; Mitchell, L Brent; Talajic, Mario; Philippon, Francois; Simpson, Chris; Yee, Raymond; Morillo, Carlos A; Lamy, Andre; Basta, Magdy; Birnie, David H; Wang, Xiaoyin; Nair, Girish M; Crystal, Eugene; Kerr, Charles R; Connolly, Stuart J

    2010-02-01

    There is uncertainty about the proper role of defibrillation testing (DT) at the time of implantable cardioverter defibrillator (ICD) insertion. A prospective registry was conducted at 13 sites in Canada between January 2006 and October 2007. To document the details of DT, the reasons for not conducting DT, and the costs and complications associated with DT. DT was conducted at implantation in 230 of 361 patients (64%). DT was more likely to be conducted for new implants compared with impulse generator replacements (71% vs 32%, P = 0.0001), but was similar for primary and secondary prevention indications (64% vs 63%, P = NS). Among patients not having DT, the reason(s) given were: considered unnecessary (44%); considered unsafe, mainly due to persistent atrial fibrillation (37%); lack of an anesthetist (20%); and, patient or physician preference (6%). When performed, DT consisted of a single successful shock > or = 10J below maximum device output in 65% of cases. A 10J safety-margin was met by 97% of patients, requiring system modification in 2.3%. Major perioperative complications occurred in 4.4% of patients having DT versus 6.6% of patients not having DT (P = NS). ICD insertion was $844 more expensive for patients having DT (P = 0.16), largely due to increased costs ($28,017 vs $24,545) among patients having impulse generator replacement (P = 0.02). DT was not performed in a third of ICD implants, usually due to a perceived lack of need or relative contraindication.

  4. Set-up and Test Procedure for Suction Installation and Uninstallation of Bucket Foundation

    DEFF Research Database (Denmark)

    Koteras, Aleksandra Katarzyna

    This technical report describes the set-up and the test procedures for installation and uninstallation of medium-scale model of bucket foundation that can be performed in the geotechnical part of laboratory in Aalborg University. The installation of bucket foundation can be tested with the use of......) and loading frame used for those tests have been already used for axially static and cyclic loading of piles (Thomassen, 2015a) and for axially static and cyclic loading of bucket foundation (Vaitkunaite et al., 2015).......This technical report describes the set-up and the test procedures for installation and uninstallation of medium-scale model of bucket foundation that can be performed in the geotechnical part of laboratory in Aalborg University. The installation of bucket foundation can be tested with the use...... of suction under the bucket lid or by applying additional force through the hydraulic piston, forcing the bucket to penetrate into the soil. Tests for uninstallation are performed also with the use of water pressure, as a reverse process to the suction installation. Both installation and uninstallation tests...

  5. Drop Weight Device Fabrication and Tests for a Dynamic Material Property of Shock-Absorbing Material and Structure in Transportation Package

    International Nuclear Information System (INIS)

    Choi, Woo Seok; Jeon, Jea Eon; Han, Sang Hyeok; Lee, Sang Hoon; Seo, Ki Seok

    2009-01-01

    A radioactive material transportation package consists of canister and impact limiters. IAEA Safety Standard Series No. TS-R-1 recommends a drop test to evaluate the structural integrity of a transportation package under a hypothetical accident condition. The free drop test of a transportation package from 9 m height simulates one of accident conditions. The transportation package has a potential energy corresponding to 9 m drop height, and this energy changes to a kinetic energy when it impacts on the target. The energy is absorbed by a deformation of shock-absorbing material so that the minimum energy is transferred to canister. Accordingly, the shock-absorbing material is a very important part in transportation package design. Since the data for shock-absorbing material characteristics is acquired by a static test in general, it is quite different to that of dynamic characteristics. And the dynamic characteristics data is hardly found in literature. In this study, a drop weight facility was designed and fabricated which produces an impact speed like that of free drop of 9 m height. Several materials considered for an impact limiter and impact limiter structures were tested by a drop weight facility to acquire a dynamic material characteristics data

  6. Drop Weight Device Fabrication and Tests for a Dynamic Material Property of Shock-Absorbing Material and Structure in Transportation Package

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Woo Seok; Jeon, Jea Eon; Han, Sang Hyeok; Lee, Sang Hoon; Seo, Ki Seok [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2009-05-15

    A radioactive material transportation package consists of canister and impact limiters. IAEA Safety Standard Series No. TS-R-1 recommends a drop test to evaluate the structural integrity of a transportation package under a hypothetical accident condition. The free drop test of a transportation package from 9 m height simulates one of accident conditions. The transportation package has a potential energy corresponding to 9 m drop height, and this energy changes to a kinetic energy when it impacts on the target. The energy is absorbed by a deformation of shock-absorbing material so that the minimum energy is transferred to canister. Accordingly, the shock-absorbing material is a very important part in transportation package design. Since the data for shock-absorbing material characteristics is acquired by a static test in general, it is quite different to that of dynamic characteristics. And the dynamic characteristics data is hardly found in literature. In this study, a drop weight facility was designed and fabricated which produces an impact speed like that of free drop of 9 m height. Several materials considered for an impact limiter and impact limiter structures were tested by a drop weight facility to acquire a dynamic material characteristics data.

  7. A procedure for the significance testing of unmodeled errors in GNSS observations

    Science.gov (United States)

    Li, Bofeng; Zhang, Zhetao; Shen, Yunzhong; Yang, Ling

    2018-01-01

    It is a crucial task to establish a precise mathematical model for global navigation satellite system (GNSS) observations in precise positioning. Due to the spatiotemporal complexity of, and limited knowledge on, systematic errors in GNSS observations, some residual systematic errors would inevitably remain even after corrected with empirical model and parameterization. These residual systematic errors are referred to as unmodeled errors. However, most of the existing studies mainly focus on handling the systematic errors that can be properly modeled and then simply ignore the unmodeled errors that may actually exist. To further improve the accuracy and reliability of GNSS applications, such unmodeled errors must be handled especially when they are significant. Therefore, a very first question is how to statistically validate the significance of unmodeled errors. In this research, we will propose a procedure to examine the significance of these unmodeled errors by the combined use of the hypothesis tests. With this testing procedure, three components of unmodeled errors, i.e., the nonstationary signal, stationary signal and white noise, are identified. The procedure is tested by using simulated data and real BeiDou datasets with varying error sources. The results show that the unmodeled errors can be discriminated by our procedure with approximately 90% confidence. The efficiency of the proposed procedure is further reassured by applying the time-domain Allan variance analysis and frequency-domain fast Fourier transform. In summary, the spatiotemporally correlated unmodeled errors are commonly existent in GNSS observations and mainly governed by the residual atmospheric biases and multipath. Their patterns may also be impacted by the receiver.

  8. Containment integrity and leak testing. Procedures applied and experiences gained in European countries

    International Nuclear Information System (INIS)

    1987-01-01

    Containment systems are the ultimate safety barrier for preventing the escape of gaseous, liquid and solid radioactive materials produced in normal operation, not retained in process systems, and for keeping back radioactive materials released by system malfunction or equipment failure. A primary element of the containment shell is therefore its leak-tight design. The report describes the present containment concepts mostly used in European countries. The leak-testing procedures applied and the experiences gained in their application are also discussed. The report refers more particularly to pre-operational testing, periodic testing and extrapolation methods of leak rates measured at test conditions to expected leak rates at calculated accident conditions. The actual problems in periodic containment leak rate testing are critically reviewed. In the appendix to the report a summary is given of the regulations and specifications applied in different member countries

  9. Medium Voltage Microgrid Test Setup and Procedures Implemented on a Real Pilot Project

    Directory of Open Access Journals (Sweden)

    Bruno Alberto Pacheco

    2018-01-01

    Full Text Available This paper presents various concepts related to the application of a microgrid pilot project in a residential condominium at Fortaleza / CE – Brazil, such as battery energy system, renewable and distributed generation, islanding recloser and all different units using interface based on power electronics. This papers main objective is to create information about microgrid operation and the interaction between its main equipment, such as power converters, utility energy distribution system and control units responsible for algorithms and changes in microgrids operation mode. This information is important for understanding the need for a test setup construction. To perform the test procedures, a temporary setup in a controlled environment within the microgrid is proposed. During the test periods, intentional power outages are required to evaluate the operating mode switching on each unit. The test setup described in this paper aims to mitigate the tests effects on other residential units inside the condominium.

  10. Composite Monopack for 120mm Mortar, With Plastic Pallet Adapters on a 42" x 53" Wooden Pallet, MIL-STD-1660 Tests, "Design Criteria for Ammunition Unit Loads", and Extreme Temperature Tests

    National Research Council Canada - National Science Library

    Dugan, Jeffery L

    2005-01-01

    .... The test units were tested in accordance with the procedures set forth in MIL-STD-1660. Stacking, repetitive shock, edgewise-rotational drop, incline-impact, forklifting, and disassembly testing were conducted on the test units...

  11. Alternative procedure for the cold test for soybean seeds Procedimento alternativo para o teste de frio em semente de soja

    Directory of Open Access Journals (Sweden)

    Bruno Guilherme Torres Licursi Vieira

    2010-10-01

    Full Text Available The growing demand for high quality soybean [Glycine max (L. Merrill] seeds requires a precise seed quality control system from the seed industry. One way to accomplish this is by improving vigor testing. Cold test has been traditionally employed for corn seeds. However, it has also been used for other seed crops such as cotton (Gossypium spp., soybean (Glycine Max, dry bean (Phaseolus vulgaris and pea (Pisum sativum. This study was carried out with the objective of adjusting an alternative procedure for the cold test to determine soybean seed vigor. Six commercial soybean seed lots of the cultivar BRS 133 were used. The physiological potential of the seed lots was evaluated by germination on paper towel and sand box, seedling field emergence, tetrazolium, accelerated aging and electrical conductivity tests. Seed moisture content was also determined. The temperature used for the cold test procedures was 10ºC during five days. Four cold test procedures were evaluated: i plastic boxes with soil; ii rolled paper towel with soil; iii rolled paper towel without soil, and iv an alternative procedure, using rolled paper towel without soil under cold water. A completely randomized experimental design with eight replications was used and the means were compared by the Tukey test (p = 0.05. To verify the dependence between the alternative test and others single linear correlation was used. All cold test procedures had similar coefficients of variation (CV, highlighting that rolled paper towel with soil and the alternative procedure had the best performance, with an average of 94% and 93% normal seedlings and CV of 3.2% and 3.6%, respectively. The alternative procedure has satisfactory results for estimating soybean seed vigor, yielding consistent results compared to the traditional procedure.A crescente demanda por semente de soja [Glycine max (L. Merrill] de alta qualidade tem requerido da indústria de sementes um controle de qualidade mais preciso

  12. European wind turbine testing procedure developments. Task 1: Measurement method to verify wind turbine performance characteristics

    DEFF Research Database (Denmark)

    Hunter, R.; Friis Pedersen, Troels; Dunbabin, P.

    2001-01-01

    There is currently significant standardisation work ongoing in the context of wind farm energy yield warranty assessment and wind turbine power performance testing. A standards maintenance team is revising the current IEC (EN) 61400-12 Ed 1 standard forwind turbine power performance testing....... The standard is being divided into four documents. Two of them are drafted for evaluation and verification of complete wind farms and of individual wind turbines within wind farms. This document, and the project itdescribes, has been designed to help provide a solid technical foundation for this revised...... standard. The work was wide ranging and addressed 'grey' areas of knowledge, regarding existing methodologies or to carry out basic research in support offundamentally new procedures. The work has given rise to recommendations in all areas of the work, including site calibration procedures, nacelle...

  13. European wind turbine testing procedure developments. Task 1: Measurement method to verify wind turbine performance characteristics

    Energy Technology Data Exchange (ETDEWEB)

    Hunter, R.; Friis Pedersen, T.; Dunbabin, P.; Antoniou, I.; Frandsen, S.; Klug, H.; Albers, A.; Lee, W.K.

    2001-01-01

    There is currently significant standardisation work ongoing in the context of wind farm energy yield warranty assessment and wind turbine power performance testing. A standards maintenance team is revising the current IEC (EN) 61400-12 Ed 1 standard for wind turbine power performance testing. The standard is being divided into four documents. Two of them are drafted for evaluation and verification of complete wind farms and of individual wind turbines within wind farms. This document, and the project it describes, has been designed to help provide a solid technical foundation for this revised standard. The work was wide ranging and addressed 'grey' areas of knowledge, regarding existing methodologies or to carry out basic research in support of fundamentally new procedures. The work has given rise to recommendations in all areas of the work, including site calibration procedures, nacelle anemometry, multi-variate regression analysis and density normalisation. (au)

  14. The development of synthetic test procedure for hot cell equipment systems in IMEF

    International Nuclear Information System (INIS)

    Ahn, Sang Bok; Lee, Key Soon; Park, Dae Kyu; Hong, Kwon Pyo; Choo, Yong Sun

    1998-04-01

    Hot cell facility should be confirmed to operation safety through pre-commissioning test after construction. In this report, the detailed procedure of hot cell equipment are described. The contents are as follows: 1. Entrance equipment of hot cell 2. Specimen transportation equipment between hot cells 3. Waste discharge equipment in hot cell 4. Specimen loading equipment to hot cell 5. Interlinking equipment in hot cell. (author). 4 tabs

  15. A validity generalization procedure to test relations between intrinsic and extrinsic motivation and influence tactics.

    Science.gov (United States)

    Barbuto, John E; Moss, Jennifer A

    2006-08-01

    The relations of intrinsic and extrinsic motivation with use of consultative, legitimating, and pressure influence tactics were examined using validity generalization procedures. 5 to 7 field studies with cumulative samples exceeding 800 were used to test each relationship. Significance was found for relation between agents' intrinsic motivation and their use of consultative influence tactics and agents' extrinsic motivation and their use of legitimating influence tactics.

  16. Test Operations Procedure (TOP) 1-1-062 Environmental Effects Data Collection

    Science.gov (United States)

    2008-09-12

    this procedure. 11. ESTIMATION DESCRIPTION The prime example of an empirically based model is the Universal Soil Loss Equation ( USLE ) developed...impacts to human health and welfare and to the natural environment. The type of data collected might include noise levels, soil erosion, and...uptake relevant to flora/fauna and the soil erosion effects of proposed testing. c. Plan to identify any modifications/alternatives implemented

  17. Shock absorber

    International Nuclear Information System (INIS)

    Nemeth, J.D.

    1981-01-01

    A shock absorber for the support of piping and components in a nuclear power plant is described. It combines a high degree of stiffness under sudden shocks, e.g. seismic disturbances, with the ability to allow for thermal expansion without resistance when so required. (JIW)

  18. Development of a testing methodology for computerized procedure system based on JUnit framework and MFM

    International Nuclear Information System (INIS)

    Qin, Wei

    2004-02-01

    Paper Based Procedure (PBP) and Computerized Procedure System (CPS) are studied to demonstrate that it is necessary to develop CPS in Nuclear Power Plant (NPP) Instrumentation and Control (I and C) system. Computerized procedure system is actually a software system. All the desired and undesired properties of a software system can be described and evaluated as software qualities. Generally, software qualities can be categorized into product quality and process quality. In order to achieve product quality, the process quality of a software system should also be considered and achieved. Characteristics of CPS will be described to analyse the product and process of an example CPS: ImPRO. At the same time, several main product and process issues will be analysed from Verification and Validation (V and V) point of view. It is concluded and suggested that V and V activities can also be regarded as a software development process, this point of view then is applied to the V and V activities of ImPRO as a systematic approach of testing of ImPRO. To support and realize this approach, suitable testing technologies and testing strategies are suggested based on JUnit framework and Multi-level Flow Modeling (MFM)

  19. Assessment of Calculation Procedures for Piles in Clay Based on Static Loading Tests

    DEFF Research Database (Denmark)

    Augustesen, Anders; Andersen, Lars

    2008-01-01

    College in London. The calculation procedures are assessed based on an established database of static loading tests. To make a consistent evaluation of the design methods, corrections related to undrained shear strength and time between pile driving and testing have been employed. The study indicates...... that the interpretation of the field tests is of paramount importance, both with regard to the soil profile and the loading conditions. Based on analyses of 253 static pile loading tests distributed on 111 sites, API-RP2A provides the better description of the data. However, it should be emphasised that some input......Numerous methods are available for the prediction of the axial capacity of piles in clay. In this paper, two well-known models are considered, namely the current API-RP2A (1987 to present) and the recently developed ICP method. The latter is developed by Jardine and his co-workers at Imperial...

  20. A step-up test procedure to find the minimum effective dose.

    Science.gov (United States)

    Wang, Weizhen; Peng, Jianan

    2015-01-01

    It is of great interest to find the minimum effective dose (MED) in dose-response studies. A sequence of decreasing null hypotheses to find the MED is formulated under the assumption of nondecreasing dose response means. A step-up multiple test procedure that controls the familywise error rate (FWER) is constructed based on the maximum likelihood estimators for the monotone normal means. When the MED is equal to one, the proposed test is uniformly more powerful than Hsu and Berger's test (1999). Also, a simulation study shows a substantial power improvement for the proposed test over four competitors. Three R-codes are provided in Supplemental Materials for this article. Go to the publishers online edition of Journal of Biopharmaceutical Statistics to view the files.